TEXAS
AGENDA
CITY COUNCIL
MONDAY, MARCH 18, 2013
7:00 PM
502 ELM STREET
Call Meeting to Order, Invocation, Pledge of Allegiance.
2. Citizens Input:
(Citizens are allowed 3 minntes to speak, The City Council is enable to respond or to discuss any issues
brought tip during this section).
CONSENT AGENDA
3. a) Approval of Minutes: March 4, 2013 - Wok Session
March 4, 2013 - Council Meeting
b) Disbursements
c) Approve Proclamation 903-18-13 - Poison Prevention Week
(1) Approve Resolution #R03-06-13 - Authorizing the Award of a Professional Service
Provider Contract Covering Surveying Services Pertaining to the Community
Development Block Grant
4. Consider any Items Removed From Consent Agenda.
REGULAR AGENDA
5. Consider, Discuss and Possibly Act on Approving Audit for Fiscal Year End 2011/2012
by Weaver and Tidwell LLP.
6. Consider, Discuss and Possibly Approve Soliciting Request for Proposals (RFP) for a
Standby Contract for Emergency Response, Management and Recovery Services.
7. Conduct a Public Hearing Regarding Ordinance #03-03-13 - Amending the
Comprehensive Zoning Ordinance and Central Zoning Map by Granting a Specific
Use Permit for a Snow Cone Stand (Sno2Go) Into a 770 Square Feet (Approximate)
Paved Area of the Northeast Corner of the Parking Lot Located at 701 N. Stemmons.
8. Consider, Discuss and Possibly Approve Ordinance #03-03-13 - Amending the
Comprehensive Zoning Ordinance and Central Zoning Map by Granting a Specific Use
Permit for a Snow Cone Stand (Sno2Go) Into a 770 Square Feet (Approximate) Paved
Area of the Northeast Corner of the Parking Lot Located at 701 N. Stennmons.
9. Consider, Discuss and Possibly Approve the Final Plat of Lot 111 of the DATCU Sanger
Addition, Being a Re -plat of a Potion of Block 15, J.R. Sullivan West Addition, 1.246
Acres of the Rueben Bebee Survey.
10. INFORMATION ITEMS:
a) Financial and Investment Reports - February
b) Library Report- February
c) All American Dogs Report - February
11. Adjourn.
I, the undersigned authority, do hereby certify that this Notice of Meeting was posted on the
bulletin board, at the City Hall of the City of Sanger, Texas, a place convenient and readily
accessible to the general public at all times, and said notice was posted on the following date
and time: �IOVT W � / -20/3 at Z: 00 Pan. and shall remain
posted until meeting is adjourned.
Tami Taber, City Secretary
City of Sanger, Texas
TAX H
This facility is wheelchair accessible and accessible parking spaces are available. Requests for
accommodations or interpretive services must be made 48 hours prior to this meeting. Please
contact the City Secretary's office at (940) 458-7930 for further informatimr.
MINUTES: CITY COUNCIL WORKSESSION
March 4, 2013
PRESENT: Mayor Thomas Muir, Councilman Billy Ezell, Councilman Russell Martin,
Councilman Scott Stephens, Councilman Gary Bilyeu and Councilman Allen
Chick
ABSENT: Mike Brice City Manager
OTHERS
PRESENT: Tami Taber City Secretary and Sam Alexander
1. Call Meeting to Order.
Mayor Muir called the meeting to order at 6:02 p.m.
2. All American Dogs Update.
Representatives from All American Dogs were present and distributed a handout
showing the statistics from November 2012 through February 2013. They have taken
in 54 animals so far and out of those months, only 2 animals have been euthanized.
3. Overview of Items on Regular Agenda.
4. Adjourn.
Mayor Muir adjourned the meeting at 6:35 p.m.
MINUTES: CITY COUNCIL MEETING
March 4, 2013
PRESENT: Mayor Thomas Muir, Councilman Billy Ezell, Councilman Russell Martin,
Councilman Scott Stephens, Councilman Gary Bilyeu and Councilman Allen
Chick
ABSENT: Mike Brice City Manager
OTHERS
PRESENT: Tami Taber City Secretary, Sam Alexander and Cloy Richards of Grant Works
1. Call Meeting to Order, Invocation, Pledge of Allegiance.
Mayor Muir called the meeting to order at 7:03 p.m. The Mayor led the Invocation
followed by Councilman Bilyeu leading the Pledge of Allegiance.
2. Citizens Input:
(Citizens are allowed 3 minutes to speak. The City Council is unable to respond or to discuss
any issues brought up during this section).
None.
CONSENT AGENDA
a) Approval of Minutes: February 19, 2013 - Council Meeting
February 19, 2013 - Work Session
b) Disbursements
c) Approve Resolution #1102-01-13 - Authorizing the Award of a Professional Service
Provider Contract for the Community Development Block Grant
d) Approve Resolution #1102-02-13 - Authorizing Designated Signatories for
Contractual Documents for Requesting Funds Pertaining to the Community
Development Block Grant
e) Approve Resolution #R02-03-13 - Adopting Section 3 Local Opportunity Plan for
Grant Programs
f) Approve Resolution 41102-04-13 - Establishing Rules and Regulations Regarding the
Use of Excessive Force Du•ing Non -Violent Civil Rights Demonstrations
Councilman Billy Ezell made a motion to approve. Seconded by Councilman Martin.
Motion carried unanimously.
4. Consider any Items Removed From Consent Agenda
None.
REGULAR AGENDA
5. Consider, Discuss and Possibly Approve Resolution #R02-05-13 - Merging the Parks
Board With the Keep Sanger Beautiful Board and Appointing Jackie Pevehouse and
Tricia Sprabeary to the Parks Board.
Councilman Martin made a motion to approve. Seconded by Councilman Stephens.
Motion carried unanimously.
6. INFORMATION ITEMS:
a) Library Report - November
Adjourn.
Mayor Muir adjourned the meeting at 7:15 p.m.
3/01/2013
8:51 AM
DIRECT PAYABLES CHECK REGISTER
PAGE: 1
PACKET:
05637
N TX GROUNDWATER 3/1/13
M
VENDOR
SET:
99
AP VENDOR SET
BANK:
POOL
POOLED CASH ACCOUNT
CHECK
CHECK
CHECK
CHECK
VENDOR
-----------------------------------------------------------------------------------------------------------------------------
I.D.
NAME
TYPE
DATE
DISCOUNT MOUNT 1104
AMOUNT
25580
NORTH TEXAS GROUNDWATER CONSERV
I-JANI2-JUN12
WATER USAGE
R
3/01/2013
28,610.89 053065
28,610.89
'* B A N K T O T A L S ''
NO#
DISCOUNTS
CHECK ME
TOTAL APPLIED
REGULAR CHECKS:
1
0.00
28,610.89
28,610.89
HANDIFUITEN CHECKS:
0
0.00
0.00
0.00
PRE -WRITE CHECKS:
0
0.00
0.00
0.00
DRAFTS:
0
0.00
0.00
0.00
VOI❑ CHECKS:
0
0.00
0.00
0.00
NOt1 CHECKS:
0
0.00
0.00
0.00
CORRECTIONS:
0
0.00
0.00
0.00
BANK TOTALS:
1
0.00
28,610.89
28,610.89
2/28/2013 5:07 PH A / P CHECK REGISTER
PAGE: 1
PACKET:
05633 Regular Payments 2/27/13 MR
VENDOR
SET: 99
BANK
POOL POOLED CASH ACCOUNT
CHECK CHECK
CHECK
CHECK
VENDOR
NAME / I.D. DESC
TYPE
DATE
DISCOUNT AMOUNT
NO#
AMOUNT
25350
A GARAGE DOOR SERVICE
I-1998 SLIDING GATE & INSTALL
R
2/28/2013
2,059.000R
053035
2,059.00
20410
CARE NOW CORPORATE
I-895776 CARE NOW CORPORATE
R
2/28/2013
170.000R
053036
170.00
00520
CASCO INDUSTERIES, INC.
I-124448 BOOTS
R
2/28/2013
330.000R
053037
330.00
00590
CITY OF DENTON
1-12/16/12-02/10/13 WATER LAB SAMPLES 2012-13
R
2/28/2013
120.00CR
053038
120.00
00050
CONLEY SAND & GRAVEL
I -WATER LINE REPAIR ROCK LOAD
R
2/28/2013
475.00CR
053039
475.00
24160
DALLAS COUNTY INSTITUTE OF FORENSIC SCIENCES
I-S12201282 DALLAS COUNTY INSTITUTE OF
FOR R
2/28/2013
159.000R
053040
159.00
00710
DATA BUSINESS FORMS INC.
I-89570 BUSINESS CARDS, ETC
R
2/28/2013
235.82CR
053041
I-89600 BUSINESS CARDS, ETC
R
2/28/2013
123.45CR
053041
359.27
01070
GALLS INC.
I-000396358 MID RIDE HOLSTER, BOOT
R
2/28/2013
110.50CR
053042
110.50
03660
GOHLKE POOL SUPPLY, INC.
I-160491-1 HTH CHEMICAL
R
2/28/2013
323.98CR
053043
323.98
19480
HUTHER & ASSOCIATES, INC
1-37733 TESTING OF SAMPLES 2013
R
2/28/2013
540.000R
053044
540.00
11730
ICC
I -TEST FEE6/8/13 TEST FEE FOR J ILIFF
R
2/28/2013
110.000R
053045
110.00
05920
IMC WASTE DISPOSAL
I-2/26/13 4P-3A INC WASTE DISPOSAL
R
2/28/2013
1,567.50CR
053046
1,567.50
21220
IRBY TOOL & SAFETY
I-S007311814.002 PIN BRACKET, CONVECTOR
R
2/28/2013
1,053.60CR
053047
1,053.60
08210
KYIIK KAR
I-1573 CAR INSPECTIONS - PD 2013
R
2/28/2013
88.81CR
053048
88.81
2/28/2013 5:07 PM A / P CHECK REGISTER
PACKET: 05633 Regular Payments 2/27/13 MR
VENDOR SET: 99
BANK : POOL POOLED CASH ACCOUNT
PAGE: 2
CHECK CHECK
CHECK
CHECK
VENDOR
NAME / I.D.
OESC
TYPE
DATE
DISCOUNT AMOUNT
NOY
AMOUNT
17900
LOWER COLORADO RIVER
AUTHORITY
I-LB103091
TOES - COLLECTION 1/22/13
R
2/28/2013
663.11CR
053049
663.11
22540
MUNICIPAL WATER WORKS
SUPPLY, LP
I-0091500-IN
6" SPLIT MEGALUG
R
2/28/2013
70.17CR
053050
70.17
25580
NORTH TEXAS GROUNDWATER CONSERVATION DISTRICT
I-1/1/12-6/30/12
GROUNDWATER PRODUCTION
R
2/28/2013
32,500.000R
053051
I-201302284984
NORTH TEXAS GROUNDWATER CONSER
R
2/28/2013
2,528.63CR
053051
35,028.63
02970
OFFICE DEPOT
I-646564573001
PAPER 5 OFFICE SUPPLIES
R
2/28/2013
304.69CR
053052
304.69
06740
OFFICE MAX INC.
I-964531
MASTER CASTERS
R
2/28/2013
29.15CR
053053
29.15
19200
PATHMARK TRAFFIC PRODUCTS
OF TEXAS,INC.
I-0080206-I11
A -FRAME BARRICADES
R
2/28/2013
483.000R
053054
483.00
24230
PIONEER ATHLETICS
I-INV468648
STAR PAINT WHITE
R
2/28/2013
327.50CR
053055
327.50
02170
REINERT PAPER 4 CHEMICAL, INC.
I-294127
CLEANING SUPPLIES
R
2/28/2013
62.11CR
053056
I-294728
TISSUE, BLEACH, CLEANERS
R
2/28/2013
72.63CR
053056
134.74
04290
SAUCER CHAMBER OF CO2P4ERC
I -CHAMBER TAX COLLEC
HALF HOTEL TX DUE$
R
2/28/2013
3,666.57CR
053057
3,666.57
25020
SANGER HARDWARE
I-AIIOIl
PARTS S MISC
R
2/28/2013
13.96CR
053058
I-AlIC43
PARTS 5 MISC
R
2/28/2013
3.98CR
053058
17.94
17400
STAFFORD, PRECIOUS
I-02/21/12 POLICE
CONFIGURE PC/INSTALL SOFTWARE
R
2/28/2013
110.000R
053059
110.00
11030
TCEQ
I -DUE 3/2013
VWTP - PERMIT RENEWAL
R
2/28/2013
1,615.000R
053060
1,615.00
19460
TCI TIRE CENTERS
I-6270013058
TIRE REPLACE - TANKER
R
2/28/2013
616.62CR
053061
616.62
2/28/2013 5:07 IN A / P CHECK REGISTER
PACKET: 05633 Regular PayCente 2/27/13 MR
VENDOR SET: 99
BANK . POOL POOLED CASH ACCOUNT
VENDOR NAME / I.D. DESC
04560 TMCEC
1-04/2-4/2013 TRAFFICE SAFETY CONF
19260 TYLER TECHNOLOGIES
I-025-63478 WEBSITE MAIED. UTILITY
I-025-63479 COURT ONLINE SPPORT
25470 WINFIELD SOLUTIONS
I-00005832871 CHEMICALS SUPPLIES
** T O T A L S
REGULAR CHECKS:
HANDWRITTEN CHECKS:
PRE -WRITE CHECKS:
DRAFTS:
VOID CHECKS:
NON CHECKS:
CORRECTIONS:
REGISTER TOTALS:
TOTAL ERRORS: 0 TOTAL WARNINGS: 0
CHECK CHECK CHECK
TYPE DATE DISCOUNT AMOUNT NO#
R 2/28/2013 300.000R 053062
R 2/28/2013
R 2/28/2013
R 2/28/2013
110.000R 053063
125.000R 053063
PAGE: 3
CHECK
AMOUNT
300.00
235.00
392.33CR 053064 392.33
NO#
DISCOUNTS
CHECK MT
TOTAL APPLIED
30
0.00
51,461.11
51,461.11
0
0.00
0.00
0.00
0
0.00
0.00
0.00
0
0.00
0.00
0.00
0
0.00
0.00
0.00
0
0.00
0.00
0.00
0
0.00
0.00
0.00
30
0.00
51,461.11
51,461.11
3/04/2013 4:55 ON A / P CHECK REGISTER
PACKET: 05638 3/4/13 OF
VENDOR SET: 99
BANK POOL POOLED CASH ACCOUNT
CHECK CHECK
VENDOR
NAME / I.D.
SEES
TYPE
DATE
24860
AFFORDABLE FENCING
I-2/26/13
MOVE GATES
R
3/04/2013
22620
ARAMARK UNIFORM SERVICE
I-2/22/2013
UNIFORMS 2012-2013
R
3/04/2013
14560
C & G WHOLESALE
I-40956
PANTS & SHIRTS W/ ZIPPERS
R
3/04/2013
25540
CITY OF LEWISVILLE
I-2013-10
ALL SAW CLASSES
R
3/04/2013
03320
COLONIAL LIFE INSURANCE
I-COL201302054958
HEALTH INSURANCE
R
3/04/2013
I-COL201302204979
HEALTH INSURANCE
R
3/04/2013
I-LIF201302054958
LIFE INSURANCE
R
3/04/2013
I-LIF201302204979
LIFE INSURANCE
R
3/04/2013
17640
DOLLAR GENERAL - CHARGED SALES
I-1000179728
COFFEE
R
3/04/2013
03170
HI -WAY EQUIPMENT CO.
I-C14069
BACKROE REPAIR
R
3/04/2013
I-G90548
DUST COLLECTOR
R
3/04/2013
20680
JASPER ENGINE & TRANSMISSIONS
C-5842430-1
TRANSMISSION ASSEMBLY
R
3/04/2013
I-5842430
TRANSMISSION ASSEMBLY
R
3/04/2013
22410
JOHN DEERS COMPANY
1-63802587
15-5-10 25% BOB 2FE
R
3/04/2013
25110
KEYSTONE FLEX ADMINISTRATORS, LLC
I -MARCH 2O13
NL RCH 2O13 ADMIN FEE 6 CARD
R
3/04/2013
10610
LEADERSLIFE INS. COMPANY
C-201303044985
LEADERSLIFE INS. COMPANY
R
3/04/2013
I-LLI201302054958
LIFE INSURANCE
R
3/04/2013
I-LLI201302204979
LIFE INSURANCE
R
3/04/2013
01570
LCWE•S COMPANIES, INC.
I-956577
COMBO DRILL/HAMMER
R
3/04/2013
I-956821
TB - LIGHT BULBS
R
3/04/2013
I-956822
DCOR CLOSURE & SWEEP
R
3/04/2013
I-982979
ANCHOR & WASHERS
R
3/04/2013
I]FY�l ll1II4i2Afl43Mi
PAGE: 1
CHECK CHECK
NO$ AMOUNT
1,950.000R 053066 1,950.00
515.30CR 053061 515.30
122.97CR 053068 122.97
340.000R 053069 340.00
11.80CR 053070
11.80CR 053070
8.67CR 053070
8.66CR 053070 40.93
93.80CR 053071 93.80
125.000R 053072
50.32CR 053072 175.32
900.00 053073
2,869.000R 053073 1,969.00
657.88CR 053074 657.88
131.50CR 053075 131.50
0.02 053076
43.34CR 053076
43.34CR 053076 86.66
132.05CR 053077
56.000R 053077
59.22CR 053077
317.18CR 053077 564.45
3/04/2013 4:55 PM A / P CHECK REGISTER
PACKET: 05638 3/4/13 OF
VENDOR SET: 99
BANK POOL POOLED CASH ACCOUNT
PAGE: 2
CHECK
CHECK
-
CHECK
CHECK
VENEOR
NAME / I.D. DESC
TYPE
DATE
DISCOUNT
AMOUNT
NOR
AMOUNT
21140
'R & T ELECTRIC, LLC
I-5031 MIST ELECTRIC WORK
R
3/04/2013
1,700A0CR
053078
1,700.00
18380
R & T MECHANICAL
1-19987 SERVICE PANAL A/C UNIT
R
3/04/2013
300.000R
053079
I-30064 2/3 REPAIR AC/HVAC
R
3/04/2013
525.000R
053079
825.00
11170
RICOH AMERICAN CORP:QDS
I-22925570 COPIER LEASE 2012-2013
R
3/04/2013
329.87CR
053080
329.87
25590
SCHNEIDER ENGINEERING
I-15839 ERCOT TRANS OPERATOR ➢ESIGN
R
3/04/2013
144.50CR
053081
144.50
25550
SERVPRO
I-3443472 WATER RESTPORATION/DAMAGE
R
3/04/2013
1,182.25CR
053082
1,182.25
05720
TEXAS MONTHLY CUSTOM PUBLISHING
I-11399 ADVERTISEMENT
R
3/04/2013
5,710.000R
053083
5,710.00
00100
TMRS
I-RET201302054958 TENS
R
3/04/2013
14,652.12CR
053084
I-RET201302204979 INNS
R
3/04/2013
14,005.98CR
053084
28,658.10
16640
WATCH GUARD VIDEO
I-4REINV0001040 IN CAR CAMERAS & MIT
R
3/04/2013
9,640.000R
053085
I-SRINVC005982 REPAIR & MICROPHONE
R
3/04/2013
111.000R
053085
I-SRINVO020020 REPAIR & MICROPHONE
R
3/04/2013
607.000R
053085
10,358.00
* * T 0 T A L S '
NO#
DISCOUNTS
CHECK ANT
TOTAL APPLIED
REGULAR CHECKS:
20
0.00
55,555.53
55,555.53
HANDWRITTEN CHECKS:
0
0.00
0.00
0.00
PRE -WRITE CHECKS:
0
0.00
0.00
0.00
DRAFTS:
0
0.00
0.00
0.00
VOID CHECKS:
0
0.00
0.00
0.00
NON CHECKS:
0
0.00
0.00
0.00
CORRECTIONS:
0
0.00
0.00
0.00
REGISTER TOTALS:
20
0.00
55,555.53
55,555.53
TOTAL ERRORS: 0 TOTAL WARNINGS: 0
3/04/2013 4:56 PIN A / P CHECK REGISTER
PACKET: 05641 Regular Payments 3/4/13 OF
VENDOR SET: 99
BANK ENP B EMPLOYEE BENEFIT FUND
PAGE: 1
CHECK CHECK
CHECK
CHECK
VENDOR
NAME / I.D. DESC
TYPE
DATE
DISCOUNT
AMOUNT
N09
AN.OUIIT
24870
AETNA
I-HI2201302054958 HEALTH INS 12-13 - AETNA
R
3/04/2013
14,012.50CR
000241
I-11122013022049" HEALTH INS 12-13 - AETNA
R
3/04/2013
14,012.50CR
000241
28,025.00
24890
BLOCK VISION OF TEXAS, INC
C-3/1/13-3/31/13 3/1/13-3/31/13
R
3/04/2013
0.23
000242
I-VI2201302054958 EMPLOYEE VOL VISION INSURANCE
R
3/04/2013
195.93CR
000242
I-VI2201302204979 EMPLOYEE VOL VISION INSURANCE
R
3/04/2013
195.93CR
000242
391.63
24880
METLIFE
C-LIFE 3/1/13 METLIFE LIFE 3/1/13
R
3/04/2013
2.68
000243
I-012201302054958 DENTAL INS MET LIFE 12-13
R
3/04/2013
1,404.58CR
000243
I-D12201302204979 DENTAL INS NET LIFE 12-13
R
3/04/2013
1,404.58CR
000243
I-DENTAL'3/l/13 METLIFE 3/1/13
R
3/04/2013
25.70CR
000243
Z MLB201302054958 ENT $25,000LIFE INSURANCE
R
3/04/2013
113.46CR
000243
I 14LB201302204979 EMP $25,000LIFE INSURANCE
R
3/04/2013
113.46CR
000243
I-MLV201302054958 EMPLOYEE VOLUNTARY LIFE INS
R
3/04/2013
315.17CR
000243
I-MLV201302204979 EMPLOYEE VOLUNTARY LIFE INS
R
3/04/2013
312.27CR
000243
3,686.54
+ + T 0 T A L S ' ' NO#
DISCOU➢TS
CHECK ACTT
TOTAL APPLIED
REGULAR CHECKS: 3
0.00
32,103.17
32,103.17
HANDWRITTEN CHECKS: 0
0.00
0.00
0.00
PRE -WRITE CHECKS: 0
0.00
0.00
0.00
DRAFTS: 0
0.00
0.00
0.00
VOID CHECKS: 0
0.00
0.00
0.00
NON CHECKS: 0
0.00
0.00
0.00
CORRECTIONS: 0
0.00
0.00
0.00
REGISTER TOTALS: 3 0.00 32,103.17 32,103.17
TOTAL ERRORS: 0 TOTAL WARNINGS: 0
3/06/2013 5:16 IN
REFUNDS
CHECK REGISTER
PAGE:
1
PACKET:
05656 US -
Refund
VENDOR
SET: 99 AP VENDOR SET
HANK:
POOL POOLED CASH ACCOUNT
CHECK
CHECK
CHECK
CHECK
VENDOR
-----------------------------------------------------------------------------------------------------------------------------
Z.D.
NAME
TYPE
DATE
DISCOUNT AMOUNT
N04
AMOUNT
1
SCOTT BROWN PROPERTIES
I-000201303064987
SCOTT BROWN PROPERTIES
R
3/06/2013
29.12
053137
29.12
1
TEAGUE, PHILLIP
I-000201303064988
TEAGUE, PHILLIP
R
3/06/2013
147.66
053138
147.66
1
FERGUSON, AUSTIN
I-000201303064989
FERGUSON, AUSTIN
R
3/06/2013
143.79
053139
143.79
1
MURPHY, VINCENT
I-000201303064990
M.URPHY, VINCENT
R
3/06/2013
32.76
053140
32.76
1
EWE, MARK
I-000201303064991
BOOS, MARK
R
3/06/2013
121.29
053141
121.29
1
SEWELL, ROGER
1-000201303064992
OTWELL, ROGER
R
3/06/2013
17.44
053142
17.44
1
-
SHARP, LINDA
I-000201303064993
SHARP, LINDA
R
3/06/2013
29.09
053143
29.09
1
LEWIS, BRANDI
I-000201303064994
LEWIS, BRANDS
R
3/06/2013
13.49
053144
13.49
1
HANSOM, CLAYTON
I-000201303064995
HANSON, CLAYTON
R
3/06/2013
51.04
053145
51.04
1
PAVE CON LTD
I-000201303064996
PAVE CON LTD
R
3/06/2013
942.97
053146
942.97
1
LGI HCMES
I-000201303064997
LGI HCMES
R
3/06/2013
71.91
053147
71.91
1
LGI HOMES - QUAIL
RUN,
LLC
I-000201303064998
LGI HCMES - QUAIL
RUN,
LLC
R
3/06/2013
164.84
053148
164.84
1
LGI HCMES - QUAIL
RUN,
LLC
I-000201303064999
LGI HOMES - QUAIL
RUN,
LLC
R
3/06/2013
154.83
053149
154.83
1
LGI HOMES - QUAIL
RUN,
LLC
I-000201303065000
LGI HCMES - QUAIL
RUN,
LLC
R
3/06/2013
105.51
053150
105.51
1
LGI HCMES
1-000201303065001
LGI HOMES
R
3/06/2013
340.05
053151
340.05
3/06/2013 5:16 PM REFUNDS CHECK REGISTER PAGE: 2
PACKET: 05656 US - Refund
VENDOR SET: 99 AP VENDOR SET
BANK: POOL POOLED CASH ACCOUNT
VENDOR I.O. 14AME
---------------------------------------
ME SNOW
I-000201303065002 ME SHOW
JANGLE$
I-000201303065003 JANGLES
CHECK
CHECK
CHECK
TYPE
--------------------------------------------------
DATE
DISCOUNT AMOUNT
NOB
R
3/06/2013
138.69
053152
R
3/06/2013
176.84
053153
** B A N K T O T A L S **
NOB
DISCOUNTS
CHECK AST
TOTAL APPLIED
REGULAR CHECKS:
17
0.00
2,681.32
2,681.32
HANDWRITTEN CHECKS:
0
0.00
0.00
0.00
PRE -WRITE CHECKS:
0
0.00
0.00
0.00
DRAFTS:
0
0.00
0.00
0.00
VOID CHECKS:
0
0.00
0.00
0.00
NON CHECKS:
0
0.00
0.00
0.00
CORRECTIONS:
0
0.00
0.00
0.00
BANK TOTALS:
11
0.00
2,681.32
2,681.32
CHECK
AMOUNT
138.69
176.84
3/06/2013 5:17 PM
REFUNDS
CHECK REGISTER
PAGE:
1
PACKET:
05657 US - Refund
VENDOR
SET: 99 AT VENDOR SET
BANK:
POOL POOLED CASH ACCOUNT
CHECK
CHECK
CHECK
CHECK
VENDOR
-----------------------------------------------------------------------------------------------------------------------------
I.D. NAME
TYPE
DATE
DISCOUNT
AMOUNT
N08
AMOUNT
1
FRANTZ, JESSICA
I-000201303065001 FRANTZ, JESSICA
R
3/06/2013
73.33
053132
73.33
1
HUNTER, JAMES
1-000201303065004 HUNTER, JAMES
R
3/06/2013
73.21
053133
13.21
1
LGI HOMES
1-000201303065008 LGI HCMES
R
3/06/2013
10.39
053134
70.39
1
RENTERIA, THOMAS
I-000201303065006 RENTERIA, THONAS
R
3/06/2013
300.00
053135
300.00
1
WARE, DOLLIE
I-000201303065005 WARE, DOLLIE
R
3/06/2013
103.88
053136
103.88
** B A N K T O T A L S **
N06
- DISCOUNTS
CHECK MAT
TOTAL APPLIE❑
REGULAR CHECKS:
5
0.00
620.81
620.81
HANUKRITT£N CHECKS:
0
0.00
0.00
0.00
PRE -WRITE CHECKS:
0
0.00
0.00
0.00
DRAFTS:
0
0.00
0.00
0.00
VOID CHECKS:
0
0.00
0.00
0.00
NON CHECKS:
0
0.00
0.00
0.00
CORRECTIONS:
0
0.00
0.00
0.00
HANK TOTALS:
5
0.00
620.81
620.81
3/07/2013 2:42 Pf4 A / P CHECK REGISTER
PACKET: 05661 Regular Pay�" 3/7/13 CF
VENDOR SET: 99
BALK POOL POOLED CASH ACCOUNT
PAGE: 1
CHECK
CHECK
CHECK
CHECK
VENDOR
HERE / S.D.
DESC
TYPE
DATE
DISCOUNT AMOUNT
NOk
IRIOUNT
07860
ACT PIPE SUPPLY, INC
I-754034
PARTS -LIDS & REPAIRS
R
3/07/2013
461.97CR
053154
461.97
18330
AMERICAN REHAB L INSPECTIONS, INC.
I-18941
WALGART SEVIER LIDS
B
3/07/2013
638,00CR
053155
638.00
02460
AT&T LOBILITY
I-287019592694XG2282
CELL SERVICE 1/23-2/22/13
B
3/03/2013
752.29CR
053156
752.29
20410
CARE NON CORPORATE,
I-896717
DRUG TESTING
R
3/07/2013
280.000R
053157
280.00
12760
CINTAS, INC.
I-492753067
UNIFORMS 10/1-9/30/13
B
3/07/2013
70.55CR
053158
1-492756004
UNIFORMS 10/1-9/30/13
R
3/07/2013
70.55CR
053158
1-492759024
UNIFORMS 10/1-9/30/13
IT
3/07/2013
70.55CR
05315E
1-492762040
UNIFORMS 10/1-9/30/13
R
3/0/2013
70.55CR
053158
282.20
00600
CITY OF SATURN
I -MARCH 1, 2013
CITY BILLS 1/16-2/15/13
R
3/07/2013
37,208.70CR
053159
37,208.70
21100
COLELAN LAW FIRRI
I-1,iARCH 4, 2013
PROSECUTOR 2012-2013
R
3/07/2013
637.50CR
053160
637.50
00800
COSERV ELECTRIC
1-02/28/2013
ELECTRIC 1/17-2/15/13
R
3/07/2013
1,980.25CR
053161
1,980.25
00740
MAD
I-6199
2ND OTR ALLOCATION
R
3/07/2013
4,877.36CR
053162
4,877.36
00840
DENTON PUBLISHING CO.,
INC.
I-100099643-02282013
LEGAL NOTICE 3/11/13 HF.ET
R
3/07/2013
18.50CR
053163
I-100994617-02232013
LEGAL NOTICE 3/11/13 MEET
R
3/07/2013
28.30CR
053163
96.80
18340
FIRST ADVANTAGE BACKGROUND SVCS
I-7750YD1302
BACKGROUND SVC
R
3/07/2013
30.000R
053164
30.00
20640
FOSTERS LOCK SERVICE
I-20020
KEY PAD LOCK
R
3/07/2013
615.000R
053165
615.00
18790
FUELIMN
I-NP37256815
VEHICLE FUEL 2/18-2/24/13
R
3/07/2013
2,084.08CR
053166
I-TIP37380957
VEHICLE FUEL 2/25-3/3/13
R
3/07/2013
3,017.75CR
053166
5,101.83
H
3/01/2013 2:42 P14 A / P CHECK REGISTER
PACKET: 05661 Reyulac Paynents 3/7/13 CF
VENDOR SET: 99
BANK P00l, POOLED CASH ACCOUNT
CHECK
CHECK
CHECK
VENDOR
NAME / I.D.
DISC
TYPE
DATE
DISCOUNT AMOUNT
NO#
16900
GET PUBLIC SAFETY SUPPLY
I-IHV-003481
3 - PANTS
R
3/07/2013
93.48CR
053167
02610
HD SUPPLY POWER SOLUTIONS
1-2211499-00
150 W HIS BULB
R
3/07/2013
343.20CR
053168
22890
HUFMAN S ❑UFFPNN INC.
I-20
REPAIR 10" FORCE MAIN
R
3/07/2013
5,870.00CR
053169
17060
LEAD 11 EXCELLENCE
I-020135
EMS CE - OCT 12-MARCH 13
R
3/07/2013
1,296.000R
053170
16060
NEIGHBORS, ANDRE41
I -NEIGHBORS CDL 13
RENEW CDL LICENSE
R
3/07/2013
61.00CR
0531R
09090
TRUSTEE ENTERPRISE
1-2463
AIR ANALYSIS
R
3/07/2013
137.SOCR
053172
11690
PITNEY BONES - RESERVE
ACCOUNT
I-03/07/2013
REFILL POSTAGE
R
3/07/2013
4,000.00CR
053173
05510
PROGRESSIVE. WANT SOLUTIONS
OF TX, INC
I-FEB 2013
FEB 2013
R
3/07/2013
47,743.26CR
053174
02170
REINERT PAPER L CHEMICAL,
INC.
I-295106
JANITORIAL SUPPLIES
R
3/07/2013
B1.
21CR
053175
I-295223
BAGS 6 FUEL CHARGES
R
3/07/2013
15.99CR
053175
25570
REMCOR
1-13-0305
BOOM 3" CORNERS
R
3/07/2013
168.75CR
053176
12820
BISON USA, INC
I-5025259882
COPY MACHINE MAINTENANCE
R
3/07/2013
,
584.02CR
053177
24280
RUSSSELL MADDEN INC
I-12-0418
SOLENOID VALVE
R
3/07/2013
187.50CR
053178
I-12-0457
SOLENOID VALVE
R
3/07/2013
294.66CR
053178
25020
SANGER HARDWARE
I-A10029
WATER 6 WETS SUPPLIES
R
3/07/2013
39.99CR
053179
I-A10257
WATER 6 WHIP SUPPLIES
R
3/07/2013
6.99CR
053179
I-A10272
PARTS 5 RISC
R
3/07/2013
3.B9CR
053179
I-A10337
FLOOD - BATHROOM
R
3/07/2013
16.28CR
053179
I-AID375
MASTER LOCKS 4-PACK
R
3/07/2013
22.99CR
053179
I-A10492
WATER fi WWTP SUPPLIES
R
3/01/2013
25.92CR
053179
I-A10752
PARTS fi RITSC
R
3/07/2013
11.79CR
053179
I-A10810
RISC. SUPPLIES - ELECTRIC
R
3/07/2013
1.99CR
053179
I-A9437
WATER 6 WWTP SUPPLIES
R
3/07/2013
62.65CR
053179
I-A9491
WATER t WEIR SUPPLIES
R
3/07/2013
129.96CR
053179
I-A9635
PARTS L RISC
R
3/07/2013
42.33CR
053179
I-A9814
RISC SUPPLIES FOR STREET
R
3/07/2013
2.79CR
053179
I-A9816
PARTS 6 RISC
R
3/01/2013
1.99CR
053179
PAGE: 2
CHECK
AMOUNT
93.48
343.20
5,870.00
1,296.00
61.00
137.50
4,000.00
47,743.26
97.20
168.75
584.02
482.16
3/0/2013 2:42 IN A / P CHECK REGISTER
PACKET: 05661 Regular Payrents 3/7/13 CC
VENDOR SET: 99
BANK POOL POOLED CASH ACCOUNT
CHECK
CHECK
VENDOR
NAME / I.D.
DISC
TYPE
DATE
I-A9872
PARTS 5 MISC
R
3/07/2013
I-B2351
PARTS s MISC
R
3/07/2013
I-B2373
WATER a WWTP SUPPLIES
R
3/07/2013
*VOID`
VOID CHECK
V
3/07/2013
16240
SCHAD 6 PULSE
1-188912
1ST QTR SUPPLIES
R
3/01/2013
I-91360
1ST OEM SUPPLIES
R
3/07/2013
16620
SUNSHINE FILTERS
I-110651
FILTERS FOR BLOWERS
R
3/07/2013
20480
TMHRA
I-TABER 2013
MEMBERSHIP - T. TABER
R
3/07/2013
19260
TYLER TECHNOLOGIES
I-025-62996
AR - INCODE CUSTOMER RE MAINT
R
3/07/2013
22910
WEAVER AND TIDWELL,
LLP
I-199312
AUDIT YR END 9/30/2012
R
3/07/2013
25470
WINFIELD SOLUTIONS
I-000058354833
BANNER/CORNERSTONE
R
3/07/2013
19160
WORKERS ASSISTANCE
PROGRAM, INC.
I-IVC00000000045131
WORKERS ASSISTANCE PROGRMI, IN
R
3/07/2013
*' T O T A L S '
REGULAR CHECKS:
HANDWRITTEN CHECKS:
PRE -WRITE CHECKS:
DRAFTS:
VOID CHECKS:
NON CHECKS:
CORRECTIONS:
REGISTER TOTALS:
TOTAL ERRORS: 0 TOTAL WARNINGS: 0
PAGE: 3
CHECK CHECK
DISCOUNT AMOUNT NOR MOUNT
15.34CR 053179
29.37CR 053179
45.54CR 053179 459.81
053180 '*VOID"
33.000R 053181
13.50CR 053181 46.50
528.51CR
053182
528.51
75.000R
053183
75.00
682.45CR
053104
682.45
6,500.000R
053185
6,500.00
332.24CR
053186
332.24
165.54CR
053187
165.54
L'OR
DISCOU24TS
CHECK MIT
TOTAL APPLIED
33
0.00
12.2.,578.52
122,578.52
0
0.00
0.00
0.00
0
0.00
0.00
0.00
0
0.00
0.00
0.00
1
0.00
0.00
0.00
0
0.00
0.00
0.00
0
0.00
0.00
0.00
34
0.00
122,578.52
122,578.52
3/14/2013 11:34 AM DIRECT PAYABLES CHECK REGISTER
PACKET: 05667 Direct Papbles 3/14/13 C
VENDOR SET: 99 AP VENDOR SET
BANK: POOL POOLED CASH ACCOUNT
PAGE: 1
CHECK CHECK
CHECK
CHECK
VENDOR I.D. NAME
-----------------------------------------------------------------------------------------------------------------------------
TYPE DATE
DISCOUNT
MOUNT NOA
AMOUNT
25610 AUSTIN LANE TECHNOLOGIES,
INC
I -RETAINER 3/13/13 MONTHLY 11AINTENAUCE
PLAN
R 3/14/2013
3,643.00 053188
3,643.00
B A N K T 0 T A 1, S
NO#
DISCOUNTS
CHECK MIT
TOTAL APPLIED
REGULAR CHECKS:
1
0.00
3,643.00
3,643.00
HAIUKHRITTEN CHECKS:
0
0.00
0.00
0.00
PRE. -WRITE CHECKS:
0
0.00
0.00
0.00
DRAFTS;
0
0.00
0.00
0.00
VOID CHECKS:
0
0.00
0.00
0.00
1:011 CHECKS:
0
0.00
0.00
0.00
CORRECTIONS:
0
0.00
0.00
0.00
➢AUK 'TOTALS:
1
0.00
3,643.00
3,643.00
3/14/2013 11:42 AM A / P CHECK REGISTER
PACKET: 05666 Regular Paynents 3/14/13 IF
VENDOR SET: 99
BANK POOL PCOLED CASH ACCOUNT
VENDOR
NAME / I.D.
DISC
07860
ACT PIPE SUPPLY, INC
I-75573E
LAKERIDGE - WATER LINE
I-755739
LAKERIDGE - WATER LINE
I-755740
SUPPLIES - WhTIER LINE. REP
25070
ALL AMERICAN DOGS INC
I-994
FEB 13 SHELTER SERVICE
18100
AMERICAN MUNICIPAL SERVICES
I-14000
FER COLLECTIONS WARRANT
01550
ATMOS
I-01/31/13-2/28/13
GAS SERVICE. 1/31-2/28/13
00420
BOUND TREE MEDICAL,
LLC
I-80995323
1ST OTR MEDS
I-80997063
1ST OTR MEDS
I-80999771
1ST SIR MEDS
I-81011660
MEDICAL SUPPLIES 2ND
I-81011661
MEDICAL SUPPLIES 2ND
I-81011662
MEDICAL SUPPLIES 2ND
I-81012899
MEDICAL SUPPLIES 214D
I-81012900
MEDICAL SUPPLIES 2ND
I-81018156
MEDICAL SUPPLIES 2ND
00440
BRAZOS ELECTRIC
I-27912-RI-1
FEB 2013
22120
B41I
I-11709518
AGRIFORI c GENERAL PURPOS
I-11720103
ASCEND FIRE ANT - 4'ORMULP
I-11731069
ASCEND FIRE ANT FOR14U LA
17000
CONTENT WATCH
I-106325
LICENSE SUPPORT
08770
CPS OFFICE PRODUCTS
I-3502829-0
OFFICE SUPPLIES
I-3505674-0 -
OFFICE SUPPLIES
22590
EMPIRE MATERIALS 6 RECYCLING
1-73764
DRUG DISPOSAL
CHECK
� CHECK
CHECK
TYPE
DATE
DISCOUNT AMOUNT
N09
R
3/14/2013
215.40CR
053189
R
3/14/2013
77.40CR
053189
R
3/14/2013
492.22CR
053189
R 3/14/2013
R 3/14/2013
R 3/14/2013
R 3/14/2013
R 3/14/2013
R 3/14/2013
R 3/14/2013
R 3/14/2023
R 3/14/2013
R 3/14/2013
R 3/14/2013
R 3/14/2013
R 3/14/2013
R 3/14/2013
R 3/14/2013
R 3/14/2013
R 3/14/2013
R 3/14/2013
R 3/14/2013
R 3/14/2013
3,725.000R 053190
544.70CR 053191
250.37CR 053192
579.12CR 053193
10.05CR 053193
201.60CR 053193
1,262.35CR 053193
196.87CR 053193
13.30CR 053193
13.89CR 053193
6.35CR 053193
179.85CR 053193
10,963.64CR 053194
104.49CR 053195
1'/6.54CR 053195
176.54CR 053195
220.87CR 053196
365.17CR 053197
71.35CR 053197
PAGE: 1
CHECK
AMOUNT
785.02
3,725.00
544.70
250.37
2,463.38
10,963.64
457.5'7
220.87
436.52
100.000R 05319E 100.00
3/14/2013 11:42 AM A / P CHECK REGISTER
PACKET: 05666 Regular Payments 3/14/13 OF
VENDOR SET: 99
BANK POOL POOLED CASH ACCOUNT
PAGE: 2
CHECK
CHECK
CHECK
CHECK
VENDOR
NAME / I.D.
DESC
TYPE
DATE
DISCOUNT AKOUNT
FOP
Al40UNT
25560
GARY DILL BACKHOE SERVICE
I-1735
LAKERIDGE
R
3/14/2013
7,000.00CR
053199
7,000.00
03340
GENE GOHLKE
I-8395
ATHLETIC FIELD MARKER
R
3/14/2013
487.20CR
053200
487.20
19480
HITHER S ASSOCIATES,
II.0
I-37916
TESTING OF SAMPLES 2013
R
3/14/2013
460.000R
053201
1-37843
TESTING OF SAMPLES 2013
R
3/14/2013
362.50CR
053201
822.50
03530
JAMES WOOD AUTOPARK,
IVC.
I-VCCS981994
WHEEL ALIGNMENT
R
3/14/2013
178.75CR
053202
I-VCW308391
KEY CUT
R
3/14/2013
20.40CR
053202
I-VCV1308735
OIL COOLER LINES
R
3/14/2013
429.12CR
053202
I-VCW308737
ELECTRICAL SENSOR
R
3/14/2.013
63.38CR
053202
I-VCW308750
OIL COOLER
R
3/14/2013
485.87CR
053202
1,177.52
23840
JG UNIFORMS, INC
I-29914
VEST - 785
R
3/14/2013
138.62CR
053203
138.62
15060
MITCHELLI
I-RL4197002
RHNEW REPAIR, INVENTORY
R
3/14/2013
2,660.16CR
053204
2,660.16
01920
NICHOLS, JACKSON, DILLARD,HAGER
6 SMITH, LLP
I-12063448
LEGAL SERVICES FEB 2013
R
3/14/2D13
96.000R
053205
96.00
24040
NORTH TEXAS LIBRARY
PARTNERS
I-WORKSHOP3/22/13
WORKSHOP REGISTRATION
R
3/14/2013
30.000R
053206
30.00
08690
O'RFA LLY AUTO PARTS
C-1959-430287
PUMP BACK AND PINRONS
R
3/14/2013
119.00
053207
C-1959-434506
BATTERY, ALTERNATOR
R
3/14/2013
58.75
053207
C-1959-434509
BATTERY, ALTERNATOR
R
3/14/2013
70.00
053207
C-EB26467022
AIR COUPLERS, CAR, STEERI
R
3/14/2013
6.87
053207
I-1959-429147
PUMP RACK AND PIFLONS
R
3/14/2013
80.36CR
053207
I-1959-429196
FILTERS AUD ADHESICE
R
3/14/2013
12.65CR
053207
I-1959-429229
FILTERS AND ADHESICE
R
3/14/2013
22.84CR
053207
I-1959-429316
AIR COUPLERS, CAN, STEERS
R
3/14/2013
7.55CR
053207
T-1959-429332
PUMP RACK ADD PIRRONE
R
3/14/2013
276.B5CR
053207
I-1959-429333
PUMP BACK AND RIBBONS
R
3/14/2013
29.42CR
053207
I-1959-429334
HEADLIGHT/DEF FLUID
R
3/14/2013
15.99CR
053207
I-1959-429335
HEADLIGHT/DEF FLUID
R
3/14/2013
B.14CR
053207
I-1959-429468
AIR COUPLERS, CAR, BISECT
R
3/14/2013
14.99CR
053207
I-1959-429471
AIR COUPLERS, CAN, BISSET
R
3/14/2013
29.99CR
053207
I-1959-429670
TRAILER HITCH
R
3/14/2013
109.96CR
053207
I-1959-430395
LED LIGHT, BATTERY, FILTE
R
3/14/2013
34.39CR
053207
I-1959-430396
LED LIGHT, BATTERY, FILTE
R
3/14/2013
14.56CR
053207
1-1959-431662
OIL FILTERS
R
3/14/2013
10.36CR
053207
I-1959-432011
LED LIGHT, BATTERY, FILTE
R
3/14/2013
31.98CR
053207
L-1959-432323
STARTER 5 REAR MAIN SEAL
R
3/14/2013
169.11CR
053207
I-1959-432377
OIL FILTERS
R
3/14/2013
11.88CR
053207
I-1959-433754
BATTERY, ALTERNATOR
R
3/14/2013
95.88CR
053207
w
3/14/2013 11:42 AN A / P CHECK REGISTER
PACKET: 05666 Regular Payments 3/14/13 CC
VENDOR SET: 99
BANK POOL POOLED CASH ACCOUNT
PAGE: 3
CHECK
CHECK
CHECK
CHECK
VENDOR
NAME / I.D.
DESC
TYPE
DATE
DISCOUNT AMOUNT
NOR
AMOUNT
I-1959-433765
BATTERY, ALTERNATOR
R
3/14/2013
51.54CR
053207
I-1959-434487
BATTERY, ALTERNATOR
R
3/14/2013
326.98CR
053207
I-1959-434531
BATTERY, ALTERNATOR
R
3/14/2013
15.28CR
053207
I-1959-434570
OIL FILTER & AIR FILTER
R
3/14/2013
25.82CR
053207
I-1959-434658
BATTERY, ALTERNATOR
R
3/14/2013
71.88CR
053207
1-1959-434662
BATTERIES
R
3/14/2013
415.98CR
053207
I-1959-434759
OIL FILTER & AIR FILTER
R
3/14/2013
21.28CR
053207
I-1959-434978
WIPER BLADES
R
3/14/2013
33.96CR
053207
I-1959-435144
ELECTRICAL CONNECTIONS
R
3/14/2013
26.03CR
053207
1,711.03
'VOID`
VOID CHECK
V
3/14/2013
053208
"VOID"*
`VOID+
VOID CHECK
V
3/14/2013
053209
'VOID-
02970
OFFICE DEPOT
1-648562991001
OFFICE & CLEANING SUPPLY
R
3/14/2013
237.55CR
053210
1-648563341001
OFFICE & CLEANING SUPPLY
R
3/14/2013
5.80CR
053210
243.35
05510
PROGRESSIVE WAST SOLUTIONS
OF IN, INC
I-1201115556
R/O RENTAL & SLUDGE DISPO
R
3/14/2D13
132.01CR
053211
132.01
25590
SCHNEIDER ENGINEERING
I-16013
RECUT THAN OPER DESIGN
R
3/14/2013
341.25CR
053212
341.25
17400
STAFFORD, PRECIOUS
1-030613
IT SUPPORT 3/5/2013
R
3/14/2013
110.000R
053213
110.00
02690
TECHLINE, INC.
I-1455977-00
l7X13X22 SUB SURFACE PED
R
3/14/2013
2,775.00CR
053214
2,775.00
05350
TEXAS EXCAVATION SAFETY SYST
1-13-02093
MESSAGE FEES 10/1-9/30/13
R
3/14/2013
80.75CR
053215
80.75
08970
TEXAS METER & SEWER
CO
I-189561
GASKET BOLTS & CLAMPS
R
3/14/2013
72.22CR
053216
I-189615
GASKET BOLTS & CLAMPS
R
3/14/2013
284.05CR
053216
I-189616
GASKET BOLTS 6 CLAMPS
R
3/14/2013
44.26CR
053216
400.53
02910
UPPER TRINITY
I-W271303
FEB 2013
R
3/14/2013
17,586.16CR
053217
17,586.16
23760
VAULTLOGIX
I-1093238
SERVER BACK UP
R
3/14/2013
781.80CR
053218
781.80
3/14/2013 11:42 A14 A / P CHECK REGISTER
PACKET: 05666 Regular Payments 3/14/13 CF
VENDOR SET: 99
BANK POOL POOLED CASH ACCOUNT
VENDOR NAME / I.U. DESC
03440 VERMEER EQUIP. OF TEXAS
I-F90934 BLAUE KITS W/HARDWARE
'` T O T A L S +'
REGULAR CHECKS:
HANDWRITTEN CHECKS:
PRE -WRITE CHECKS:
DRAFTS:
VOID CHECKS:
NON CHECKS:
CORRECTIONS:
REGISTER TOTALS:
TOTAL ERRORS: 0 TOTAL WARNINGS: 0
PAGE: 4
CHECK CHECK
CHECK
CHECK
TYPE DATE
DISCOUNT
AMOUNT NO#
AMOUNT
R 3/14/2013
343.45CR 053219
343.45
Hot
DISCOUNTS
CHECK ffi47
TOTAL APPLIED
29
0.00
56,864.42
56,864.42
0
0.00
0.00
0.00
0
0.00
0.00
0.00
0
0.00
0.00
0.00
2
0.00
0.00
0.00
0
0.00
0.00
0.00
0
0.00
0.00
0.00
31
0.00
56,864.42
56,864.42
February 27, 2013
Mayor Thomas Muir
P.O. Box 1729
Sanger, TX 76266
Dear Mayor Thomas Muir:
March 17-23, 2013 marks the 51 th annual observance of Poison Prevention Week. This
time is used to encourage our citizens to learn more about the dangers of accidental
poisonings and to take more
On behalf of the North
proclaimed as "Poison
proclamation.
Please have the
Mike Yudi
North Texa
5201 Harry
Dallas, TX
If you have any questions, please
Sincerely,
Mike Yudizky
Public Health Education Manager
Enclosure
measures.
mfcr I'am requesting that March 17-23, 2013 be
inclosed is: a suggested
race
161-7545 x30346.
Nortb Texas Poison Center at Parkland Memorial Hospital
S201 Harry Hines Boulevard Dallas, Texas 7S23S 214,589.0911 Fax 214.S90.S008
Member o/ the Texas Poison Center Network bttp://www.poisoncoiitrol.org
PROCLAMATION 403-18-13
WHEREAS, our society has become increasingly dependent on household chemicals to perform labor-
saving, time -saving miracles; and on medicine to provide health -giving, life sustaining benefits;
WHEREAS, these products, when not used as intended or directed, may be hazardous, particularly if
children gain access to them;
WHEREAS, over the past 51 years, the nation has been observing Poison Prevention Week to call
attention to the hazards and how proper handling and disposal of these substances and proper use of
safety packaging can help eliminate them;
WHEREAS, the efforts of our community organizations, complimented by the efforts of the North
Texas Poison Center have reduced childhood poisons in Sanger, Texas;
WHEREAS, the North Texas Poison Center, a regional poison center, located at Parkland Memorial
Hospital; provides the ultimate in human service programming, immediate, accessible emergency
information to save lives of victims of poison -related emergencies, and;
WHEREAS, these programs must continue as long as even one child swallows a household product or
medicine by mistake.
NOW, THEREFORE, I, Mayor of the City of Sanger, do hereby proclaim the week of March 17-23,
2013, as Poison Prevention Week in this city. Further, I direct the appropriate agencies in our local
government to continue their cooperation with concerned citizens and community organizations,
including our schools, to develop programs which will alert our people to the continued danger of
misusing medicines and household products and to promote effective safeguards against accidental
poisonings among young children.
PASSED, APPROVED, AND ADOPTED by the City Council of the City of Sanger, Texas on the
18th day of March 2013.
Thomas E. Muir, Mayor
Tami Taber, City Secretary
SOWaRgeh
TEXAS COUNCIL AGENDA ITEM
AGENDA TYPE ❑ Regular ❑ Special M Consent Reviewed by Finance
❑ Workshop ❑ Executive ❑ Public Hearing Reviewed by Legal
❑ Yes
M Not Applicable
Yes
M Not Applicable
Council Meeting Date: March 18, 2013 Submitted By: Robert Woods
City Manager Reviewed/Approval Initials Date �j �
ACTION REQUESTED: ❑ORDINANCE # ❑ RESOLUTION M APPROVAL
❑ CHANGE ORDER ❑ AGREEMENT ❑ APPROVAL OF BID ❑ AWARD OF CONTRACT
❑ CONSENSUS ❑ REAPPOINTMENTS
AGENDA CAPTION
Discussion and possible action on the recommendation of award covering Surveying Services pertaining
to the CDBG grant program.
FINANCIAL SUMMARY
❑N/A MGRANTFUNDS [—]OPERATING EXPENSE ❑REVENUE. ❑CIP ❑BUDGETED ❑NON -BUDGETED
FISCAL YEAR:
PRIOR
YEAR
CURRENT
YEAR
FUTURE
YEAR(S)
TOTALS
Proposed Expenditure Amount
Encumbered Amount
BALANCE
FUND(S) TO BE USED: General ❑$ Utility ❑ $ Special ❑ $
BACKGROUND/SUMMARY OF ITEM
A Request for Proposals was advertised covering Surveying Services, staff received six responses. Staff selected
from the six responses All American Surveying.
STAFF OPTIONS & RECOMMENDATION
Staff recommends approval of All American Surveying.
List of Supporting Documents/Exhibits Attached:
Resolution -
Prior Action/Review by Council, Boards, Commissions or Other
Agencies:
RESOLUTION #R03-06-13
A RESOLUTION OF THE CITY OF SANGER, TEXAS, AUTHORIZING THE AWARD OF A
PROFESSIONAL SERVICE PROVIDER CONTRACT FOR THE TEXAS COMMUNITY
DEVELOPMENT BLOCK GRANT AWARD CONTRACT 712340.
WHEREAS, the recent award of a 2012 Texas CDBG contract requires implementation by
professionals experienced in engineering services such as surveying of federally -funded
community development projects;
WHEREAS, in order to identify qualified and responsive providers for these services a Request for
Qualifications (RFQ) for surveying services has been completed in accordance with Texas CDBG
requirements;
WHEREAS, the submissions received by the due date have been reviewed to determine the most
qualified and responsive provider;
NOW, THEREFORE, BE IT RESOLVED:
Section 1. That be awarded a contract to provide Texas CDBG
project -related professional surveying services for Contract 712340.
Section 2. That any and all contracts or commitments made with the above -named services
providers are dependent on the successful negotiation of a contract with the service
provider;
PASSED AND APPROVED ON , 2013
ATTEST:
Tami Taber, City Secretary Thomas Muir, Mayor
weaver>_
February 21, 2013
To the City Council and Management
City of Sanger, Texas
We have audited the financial statements of the governmental activities, the business -type
activities, each major fund, and the aggregate remaining fund information of City of Sanger for
the year ended September 30, 2012. Professional standards require that we provide you with
information about our responsibilities under generally accepted auditing standards, as well as
certain information related to the planned scope and timing of our audit. We have communicated
such information in our letter to you dated October 3, 2012. Professional standards also require
that we communicate to you the following information related to our audit.
Significant Audit Findings
Qualitative Aspects of Accounting Practices
Management is responsible for the selection and use of appropriate accounting policies. The
significant accounting policies used by the City are described in Note 1 to the financial
statements. No new accounting policies were adopted and the application of existing policies was
not changed during fiscal year 2012. We noted no transactions entered into by the governmental
unit during the year for which there is a lack of authoritative guidance or consensus. All
significant transactions have been recognized in the financial statements in the proper period.
Accounting estimates are an integral part of the financial statements prepared by management
and are based on management's knowledge and experience about past and current events and
assumptions about future events. Certain accounting estimates are particularly sensitive because
of their significance to the financial statements and because of the possibility that future events
affecting them may differ significantly from those expected. The most sensitive estimate
affecting the City's financial statements was management's estimate of the allowance for
doubtful accounts, which is based on historical loss levels, the aging of the accounts, and an
analysis of collectability of individual accounts. We evaluated the key factors and assumptions
used to develop the allowance in determining that it is reasonable in relation to the financial
statements taken as a whole.
The financial statement disclosures are neutral, consistent and clear.
Difficulties Encountered in Performing the Audit
We encountered no significant difficulties in dealing with management in performing and
completing our audit.
ANINDEPENDENT WEAVER AND TIDWELL LLP FORTWORTH
MEMBER OF BAKER TILLY CERTIFIED PUBLIC ACCOUNTANTS AND CONSULTANTS 2821 W SEVENTH STREET, SUITE 700, FORT WORTH, TX 76107
INTERNATIONAL WWW.WEAVERLLP.COM P:(817)3327905 F:(817)4295936
To the City Council and Management
City of Sanger, Texas
February 21,2013
Page 2
Corrected and Uncorrected Hisstatements
Professional standards require us to accumulate all known and likely misstatements identified
during the audit, other than those that are clearly trivial, and conummicate them to the
appropriate level of management. The attached schedule summarizes uncorrected misstatements
of the financial statements. Management has determined that their effects are immaterial, both
individually and in the aggregate, to the financial statements taken as a whole. The following
material misstatements detected as a result of the audit procedures were corrected by
management:
• To record the current year amortization on capitalized bond issue costs, capitalized
premiums/discounts, and deferred gain/loss on the refunding bond totaling $22,908 on
the government -wide statements and $10,798 in the enterprise fund.
• To correct amounts recorded as outstanding checks to an accrual totaling $39,397 related
to accrued wages in the general fund and $17,636 related to accrued interest in the debt
service fund.
• To write-off a lease that was fully paid in the current year and record a new lease for a
net effect on government -wide liabilities of $316,357, and general find capital outlay and
other financing sources of $340,119.
• To adjust inventory to actual based on the "list price" totaling $21,179 in the enterprise
Rind.
• To record retainage payable related to capital projects totaling $47,239 in the capital
projects fund.
• To record rental income from the 4A warehouse on a straight-line basis for the
government -wide financial statements including an additional asset for tenant
improvements totaling a net $65,333 which includes $4,667 of depreciation expense, a
deferred rent of $40,008, and additional rental income in the current fiscal year of
$29,992.
e To record a transfer from the general fund to the capital projects fund that wasn't
completed before year-end totaling $89,091.
• To move to the enterprise fund construction in process totaling $291,414 including _
retainage payable of $27,603 that was incorrectly recorded in the capital projects fund.
To the City Council and Management
City of Sanger, Texas
February 21, 2013
Page 3
Disagreements with Management
For purposes of this letter, a disagreement with management is a financial accounting, reporting,
or auditing matter, whether or not resolved to our satisfaction, that could be significant to the
financial statements or the auditor's report. We are pleased to report that no such disagreements
arose during the course of our audit.
Management Representations
We have requested certain representations from management that are included in the
management representation letter dated February 21, 2013.
Management Consultations with Other lndependentAccountants
In some cases, management may decide to consult with other accountants about auditing and
accounting matters, similar to obtaining a "second opinion" on certain situations. If a
consultation involves application of an accounting principle to the governmental unit's financial
statements or a determination of the type of auditor's opinion that may be expressed on those
statements, our professional standards require the consulting accountant to check with us to
determine that the consultant has all the relevant facts. To our knowledge, there were no such
consultations with other accountants.
Other Audit Findings or Issues
We generally discuss a variety of matters, including the application of accounting principles and
auditing standards, with management each year prior to retention as the governmental unit's
auditors. However, these discussions occurred in the normal course of our professional
relationship and our responses were not a condition to our retention.
This information is intended solely for the use of City Council and management of the City and
is not intended to be, and should not be, used by anyone other than these specified parties.
Yours truly,
Ct)&*OA an4 � PQ2 �• P
WEAVER AND TIDWELL, L.L.P.
JRF:kel
GENERALFUND
3002) To move one months expense for animal care to PY
Animal Care Expense
Fund Balance - Unrestricted
........... ... .. .
3003) To record accrual for franchise fees related to the Enterprise
Franchise Fee Receivable
Franchise Fees - EF
3004) To write off difference in Emera con revenue to PY
Emergicon Revenue - Ambulance
Fund Balance - Unrestricted
........................ ..
3006) To record difference in accrued payroll
Salaries Expense
......................
Accrued Payroll
3009) To move expense that should have been accrued in PY into
Fund Balance - Unrestricted
Electric Expense
FROM PRIOR YEAR
Total PY differences
TOTAL DIFFERENCES
POST TO EQUITY
........................ .
TOTAL EFFECT
TOTAL PER AUDIT
AS A PERCENT
Assets Liabilities Fund BalanceRevenue Expense
(2,400)'
2,400
15,443
(15,443)
14,255
2,194
(2,194)'
15,443 (6,094) (9,661), (1,188) 1,500
21,207 (21,207)
21,207
15,443
(6,094)
11,546
(1,188)
(19,707)
(20,895)
15,443
(6,094)
(9,349)
(1,189)
(19,707)'
1,174,080
(400,683)
(773,397)'
(4,873,195)
4,900,021
1.32%
1.52%
1.21%
0.0%
-0.40%
ENTERPRISE FUND
3001) To pass an entry to record UB accrual in PY
AR - Utility Billing
Electric Income
Net Assets - Unrestricted
3003) To record accrual for franchise fees related to the Enterprise
Fund for September billings
Franchise Fee Expense
Franchise Fees - EF
3005) To record FICA and Retirement related to accrued vacation
FICA Expense
Accrued FICA
Reiirement Expense
Accrued Retirement
3006) To record difference in accrued payroll
Salaries Expense
Accrued Payroll
3007) To record inventory error in PY
System Maintenance
Net Assets - Unrestricted
Assets Liabilities Net Assets Revenue Expense
32,306
417,764
(450,070)
15,443
(15,443)
5,200
(5,200)
4,588
(4,588)
9,230
(9,230)
72,280
(72,280)
ENTERPRISE FUND - Continued
3008) To reverse PY error of double booking water accrual
Water Expense
Fund Balance - Unrestricted
.................
3009) To move expense that should have been accrued in PY into
fiord balance
Fund Balance - Unrestricted
Electric Expense
FROM PRIOR YEAR
Total PY differences
TOTAL DIFFERENCES
POST TO EQUITY
TOTAL EFFECT
TOTAL PER AUDIT
AS A PERCENT
Assets Liabilities Net Assets Revenue Expense
20,784
(20,784)
12,569
(12,569)
32,306 (34,461) (530,565) 417,764 114,956
59,496 (44,983) - (14,513)'
59,496 (44,983)', (14,513)
91,802 (34,461) (575,548) 417,764 100,443
518,207
91,802
(34,461)
(57,341)
417,764
100,443
20,085,449
(6,891,509)
(13,193,940).
(10,773,056)
9,067,596
0.46%
0.50%
0.43%
-3.88%'
1.11%
GOVERNMENT -WIDE
General Fund
3002) To move one months expense for animal care to PY
Animal Care Expense
Fund Balance - Unrestricted
3003) To record accrual for franchise fees related to the Enterprise
Fund for September Ming
Franchise Fee Receivable
Franchise Fees - EF
3004) To write offdifference in Emergicon revenue to PY
Emergicon Revenue - Ambulance
Fund Balance - Unrestricted
3006) To record difference in accrued payroll
Salaries Expense
Accrued Payroll
3009) To move expense that should have been accrued in PY into
fiord balance
Fund Balance - Unrestricted
Electric Expense
is Liabilities Net Assets Revenue Expense
GOVERNMENT -WIDE- Continued
Government -Wide Only
4005) To record payroll taxes for vacation and sick accruals
FICA Expense
Accrued FICA
Reitrement Expense
Accrued Retirement
Total current year
FROM PRIOR YEAR
Total prior year differences
TOTAL DIFFERENCES
POST TO EQUITY
TOTAL EFFECT
TOTAL PER AUDIT
AS A PERCENT
Assets Liabilities Net Assets Revenue Expense
8,446
(8,446)'
7,452 ,
(7,452)
15,443 (21,992) (9,661) (1,188) 17,398
(109,397) 143,263 (33,866)'
(109,397) 143,263 (33,866)
(93,954) (21,992) 133,602 (1,188) (16,468),
(17,656)
(93,954)
(21,992)
115,946
(1,188)
(16,468)'
18,489,452
(8,175,703)
(10,313,749)'
(6,479,752)
5,508,539
-0.51%
0.27%
-1.12%
0.02%',
-030%
STaRgeTEXAhS COUNCIL AGENDA ITEM
AGENDA TYPE ® Regular ❑ Special ❑ Consent Reviewed by Finance
❑ Workshop ❑ Executive ❑ Public Hearing Reviewed by Legal
❑ Yes
IN Not Applicable
❑ Yes
I ❑ Not Applicable
Council Meeting Date: March 18, 2013 Submitted By: Mike Brice
City Manager Reviewed/Approval Initials) Date
ACTION REQUESTED: ❑ORDINANCE ❑ RESOLUTION ® APPROVAL
❑ CHANGE ORDER ❑ AGREEMENT ❑ APPROVAL OF BID ❑ AWARD OF CONTRACT
❑ CONSENSUS ❑ REAPPOINTMENTS
Consider, Discuss and Possibly Approve Soliciting Request for Proposals (RFP) for a Standby Contract
for Emergency Response, Management and Recovery Services.
FINANCIAL SUMMARY
®N/A ❑GRANT FUNDS ❑OPERATING EXPENSE ❑REVENUE ❑CI P []BUDGETED -BUDGETED
FISCAL YEAR:
PRIOR
YEAR
CURRENT
YEAR
FUTURE
YEARS
TOTALS
Proposed Expenditure Amount
Encumbered Amount
BALANCE
FUND(S) TO BE USED: General ❑$ Utility ❑ $ Special ❑ $
BACI{GROUND/SUMMARY OF ITEM
We recently discussed soliciting a request for proposals for disaster response and debris removal. This
will speed up the process of getting outside vendors on the ground and working after a disaster. There
is no cost to the city until and unless the city authorizes the chosen vendor to proceed. Until that time
the vendor will remain "on call'. At this time staff is requesting the RFP be solicited to receive
proposals from interested vendors. Proposals will then be reviewed and evaluated and staff will
recommend a vendor to the Council for approval
STAFF OPTIONS & RECOMMENDATION
List of Supporting Documents:
• Standby contract
Prior Action/Review by Council, Boards, Commissions or Other
Agencies:
REQUEST FOR PROPOSAL
FOR
STANDBY CONTRACT FOR
EMERGENCY RESPONSE, MANAGEMENT, AND RECOVERY SERVICES
RFP # 01-2013
as
0 441-f-Vv
Issued By:
Owners
City of Sanger, Texas
Name
Mike Brice, City Manager
Address
502 Elm St., Sanger Texas
Mail Address
PO Box 1729, Sanger, Texas 76266
Telephone
940-458-7930
Fax
940-458-4180
Email
mbrice@sangertexas.org
Date of Issue: March18, 2013
Due Date/Time for Receipt of Proposals: May 15, 2013 @ 2:00 P.M.
Revised February 5, 2013 NfB
TEXAS
To: All Proposers
From: Mike Brice Tel: 940-458-7930
Title: City Manager Email: mbrice@sangertexas.org
Re: Request for Proposal for Standby Contract for Emergency, Response,
Management & Recovery Services
Enclosed is a Request for Proposal (RFP)(Solicitation for a Standby Contract for
Emergency Response, Management, & Recovery Services in the event of a natural or
man made catastrophe.
Our community is subject to the ravages of such disasters and catastrophes.
Therefore as set forth by FEMA, each community should be prepared in advance for
such an occurrence. One step in this process is to contract with qualified firms for
them to be on standby to assist immediately in the Response, Management, Logistics
and/or Recovery from any such disaster.
We are therefore soliciting proposals from experienced disaster management and
emergency response firms for a Standby Contract for Emergency Response,
Management & Recovery Services, in compliance with FEMA Debris Management
Guide 325. This solicitation contains detailed requirements and directions. Please
follow them very closely. Failure to follow these directions, provide the required
attachments, or submit the proposal in the required format, may lead to
disqualification.
Proposers shall be judged on multiple criteria, not primarily on price, and the firm or
firms found to be the most qualified and in the Owners best interest shall be selected.
Minority, women -owned and small disadvantaged businesses are encouraged to
participate. Firms intending to respond must notify the city by the date specified.
Only those firms who register shall be qualified to submit proposals.
We appreciate each firm's interest and attention to this matter.
Sincerely,
Mike Brice
City Manager
Page 2 of 73
Igeh a
TEXAS
REQUEST FOR PROPOSAL
DEBRIS REMOVAL, REDUCTION, and DISPOSAL SERVICES
Table of Contents
Section
PAGE
1
Objective.........................................................................................
5
2
Definitions.......................................................................................5
3
Items included with Request for Proposal ......................................
5
4
Submission of Proposal...................................................................
6
5
Proposal Due Date...........................................................................
8
6
Proposal Requirements....................................................................
8
7
Proposal Evaluation......................................................................
11
8
Evaluation Criteria........................................................................
11
9
Written Requests for Interpretation/Clarifications ........................
12
10
Oral Presentation...........................................................................
12
11
Withdrawal of Proposal.................................................................
13
12
Acceptance/Rejection....................................................................13
13
Acceptance Period.........................................................................
13
14
Time Line......................................................................................
13
15
Contractor's Certification and Responsibility ...............................
13
16
Costs Incurred by Proposers.........................................................
14
17
Contractor's Personnel..................................................................
14
18
Reservation of Owner's Rights .....................................................
15
19
Subcontracting...............................................................................15
20
Disadvantaged Business Enterprise Program ................................
16
21
Contract.........................................................................................17
22
Proprietary Information.................................................................
17
23
Licenses and Certificates.; .............................................................
17
24
Continuing the Work.....................................................................
17
25
Waiver of Claims..........................................................................
18
26
Change in Scope of Work.............................................................
18
27
Use of Premises.............................................................................
19
28
Estimated Quantities.....................................................................
19
29
Performance..................................................................................
19
30
Payment and Performance Bonds Surety Letter ...........................
20
31
Payment/Invoices..........................................................................20
32
Records and Right to Audit...........................................................21
33
Safety.............................................................................................22
34
Insurance Requirements................................................................
22
35
Public Entity Crimes.....................................................................
25
36
Conflict of Interest........................................................................
25
Page 3 of 73
37 Collusion.......................................................................................25
38 Protest Procedure.......................................................................... 26
39 Award and Term........................................................................... 27
40 Jurisdiction....................................................................................27
41 Change in Ability to Perform........................................................ 27
Scopeof Work............................................................................... 28
PricingSchedule............................................................................ 56
Sample Bond Commitment Letter ................................................ 72
ProposalForm............................................................................... 73
Page 4 of 73
S�jfi'1AS
REQUEST FOR PROPOSAL
DEBRIS REMOVAL, REDUCTION, and DISPOSAL SERVICES
1. OBJECTIVE:
It is the intent of the Owner to obtain proposals from qualified firms to
establish a Standby Contract for Emergency Response, Management, and
Recovery Services. These services will not be authorized until such time as
a Notice to Proceed has been issued; typically in response to a natural or
man-made disaster.
2. DEFINITIONS: Whenever, in these Instructions, the terms defined in the
Contract are used (or pronouns used in their place), the intent and meaning of
such terms shall be interpreted as indicated in the Contract.
In addition, the following definitions shall apply:
A. Proposal means an executed formal document submitted to the Owner
stating the goods, consultant services, and/or services, as applicable,
offered by the proposer to satisfy the needs as requested in the Request
for Proposal.
B. Contract means the Agreement between the successful Contractor(s) and
the Owner in the form attached to and included in this RFP Document.
C. Goods, consultant services and/or services as applicable, mean: this
STANDBY CONTRACT for EMERGENCY RESPONSE,
MANAGEMENT AND RECOVERY SERVICES.
D. RFP Documents means this entire RFP DOCUMENT, all attachments,
these Instructions to Proposers and any addendums issued prior to the
date and time of submittal of the Proposals.
E. Contractor or Prospective Contractor or Proposer means any person or
firm having a contract with or proposing to the Owner as a result of this
RFP.
3. ITEMS INCLUDED WITH REQUEST FOR PROPOSAL:
Cover Sheet, Owners Proposal Letter, Request for Proposal
Scope of work
Pricing Schedule
Page 5 of 73
Sample Surety Letter
Sample Prospective Contractors Proposal Letter
4. SUBMISSION OF PROPOSAL:
A. SUBMITTAL: Proposals shall be enclosed in an opaque sealed envelope
or package, addressed to the Owner. The name and address of the
prospective Contractor, the date and hour of the proposal submittal, and
the title Request for Proposals for Standby Emergency Response,
Management, and Recovery Services RFP shall be placed on the outside
of the envelope. All items required for a responsive Proposal shall be
included. It is the responsibility of the Proposer to ensure that the
Proposal Package is complete and received at the proper time.
B. EXAMINATION OF RFP DOCUMENTS: It is the responsibility of
each Proposer before submitting a Proposal, to: a) Examine the RFP
documents thoroughly; and b) Consider and comply with all federal, state
and local laws and regulations, and local conditions that may affect cost,
progress, or performance of the project.
C. FORMAT: Proposals must follow the format of the RFP and be
structured so as to follow the required sequence. Each Contractor shall
submit seven (7) complete sets of the proposal (one hard copy marked
"Original" and six (6) marked "Copy") and one electronic copy on a disc
or CD. Email copies and fax copies shall not be accepted.
D. EXPERIENCE: Prospective Contractors must have experience in work of
the same or similar nature, similar volumes, be capable of funding such
potentially massive work for weeks or longer, must provide a reference
list of at least five (5) Government customers for whom they have
performed similar services, and Hurst provide all information as specified
herein.
U. EXCEPTIONS: Prospective Contractors are advised that exceptions to any
of the terms contained in this RFP must be identified in the response to the
RFP. Failure to do so may lead the Owner to declare any such term non-
negotiable, and/or may lead to the disqualification of the proposal.
F. EXPENSES OF PREPARATION: The Owner is not responsible for any
expenses which Prospective Contractors may incur in preparing and
submitting proposals called for in this Request for Proposal.
G. INTERVIEWS: The Owner reserves the right to conduct personal
interviews or require presentations from any or all prospective
Contractors prior to selection. The Owner will not be liable for any costs
incurred by the proposer in connection with such interviews/presentations
(i.e., travel, accommodations, etc.).
Page 6 of 73
H. MODIFICATION: The Owner reserves the right to request that the
proposer modify their proposal to more fully meet the needs of the
Owner, and/or to more fully describe their proposal.
I. ADDITIONAL INFORMATION: The Prospective Contractor shall
furnish such additional information as the Owner may reasonably require.
This includes information which indicates financial resources as well as
ability to provide and maintain the services and/or recovery operations
for several weeks or more. The Owner reserves the right to make
investigations of the qualifications of the proposer as it deems
appropriate, including but not limited to a financial review and a
background investigation.
J. NEGOTIATIONS: The Owner reserves the right to negotiate
modifications to proposals that it deems acceptable, reject any and all
proposals, and to waive minor irregularities in the procedures.
K. PERIOD OF ELIGIBILITY: All proposals submitted shall be binding for
one hundred twenty (120) calendar days following the date of opening.
L. ALTERNATE PROPOSALS:
a. An alternate proposal is viewed by the Owner as a proposal
describing an approach to accomplishing the requirements of the
Request for Proposals, which differs, from the approach set forth in
the solicitation.
b. An alternate proposal may also be a second proposal submitted by the
same proposer, which differs in some degree from its basic or prime
proposal, but is included within the same proposal package.
c. Alternate proposals may address the technical approach, or other
provision or requirements set forth in the solicitation.
d. The Owner may, during the initial evaluation process, consider all
alternate proposals submitted.
M. ADDENDA: If it becomes necessary to revise or amend any part of the
Request for Proposal, the Owner will furnish the revision by written
Addendum to all prospective Contractors who received an original
Request for Proposals. It will be the responsibility of the proposer to
contact the Owner prior to submitting a proposal to ascertain if any
addenda have been issued, to obtain all such addenda, and to return
executed addenda with the proposal. Failure to include signed Addendum
with the proposal shall be grounds for rejection of a proposal.
N. EXECUTION OF CONTRACT: The Contract between Proposer and
Owner shall be in the form of the "Agreement" provided by Owner. The
successful Proposer shall assist and cooperate with the Owner in
executing the Contract in a timely manner if notified of a successful
award by Owner.
Page 7 of 73
O. TAXES: Cost of all sales and other taxes for which the Proposer is liable
under the Contract shall be included in the Proposal.
P. NOTICE OF INTENT: Proposers must respond by April 5, 2013 in
writing indicating their intent to respond to the RFP. Responses shall be
submitted to City of Sanger, Attention City Manager, PO Box 1729,
Sanger, Texas 76266. Responses should be on Company Letterhead and
indicate the contact person for the Company. Failure to send a notice of
intent will preclude any RFP submitted to be considered.
5. PROPOSAL DUE DATE:
Sealed proposals will be received at the Sanger City Hall on Wednesday, May
15, 2013, by 2:00 PM. Proposals shall be opened by the Evaluation
Committee in private. Any awards resulting from an evaluation shall be
announced publicly. Proposals received by the Owner after the time specified
for receipt will not be considered. Proposers shall assume full responsibility for
timely delivery of their proposals to the location designated for receipt of
proposals. Fax Copies and Email Copies shall not be accepted.
6. PROPOSAL REQUIREMENTS:
Proposals shall include all of the information required by the Request for
Proposal, and any additional data that the Prospective Contractor deems
pertinent to the understanding and evaluation of the proposal.
Proposals are to be addressed as follows for mail, express delivery or hand
delivery:
Owner/Representative: Mike Brice
Title: City Manager
Owner: Sanger, Texas
For Other Delivery: 502 Elm St.
For U S Mail: PO Box 1729
Tel: 940-458-7930
Fax:940-458-4180
Email: mbrice@sangertexas.org
Page 8 of 73
Proposals shall be organized and sections tabbed in the following order. All
Proposals shall include at minimum:
TITLE PAGE: Show the name of proposer's firm, address, telephone number,
email, name of contact person, date, and the subject: RFP 401-2013 -
REQUEST FOR PROPOSAL FOR STANDBY CONTRACT FOR
EMERGENCY RESPONSE, MANAGEMENT AND RECOVERY
SERVICES.
TABLE OF CONTENTS: Include a clear identification of the material by tab
and by page number.
Tab 1 - Contractor's Profile and Submittal Letter
A. Submittal Letter signed by an authorized agent of the Prospective
Contractor.
B. A proposal statement setting forth in detail how the Proposal meets the
proposal requirements and evaluation factors and, where applicable,
C. Organizational structure and locations of business with ownership interests
Tab 2 — Qualifications
Provide a description and history of the firm focusing on the following:
A. Experience in all aspects of emergency management, including response,
procurement, operation, planning, contract management, and accounting
systems.
B. Document knowledge and experience with state and local emergency
management agencies; state and federal programs; funding sources and
reimbursement processes.
C. Demonstrate detailed experience and expertise pertaining to all of aspects
the Scope of Work set forth herein.
D. Demonstrate knowledge of environmental requirements and regulations.
Tab 3 - Technical Approach
A. Provide a narrative description with an organizational chart outlining the
mobilization, operational plans, and structure, services to be provided and
how and when these services shall be provided. This description should fully
and completely demonstrate the Prospective Contractor's intended methods
for servicing the requirements of all aspects of the Scope of Work set forth
herein.
B. Prospective Contractor may offer alternative solutions/options to achieve
successful completion of the Scope of Work detailed herein.
Tab 4- Reimbursement Process
A. Prospective Contractor shall demonstrate their knowledge of and experience
with the FEMA reimbursement process; the FEMA initial Damage
Page 9 of 73
Estimates; Immediate Needs Funding (INF), the Project Worksheets
completion and application process.
Tab 5- Key Personnel
A. Include a listing of key staff including resumes for each describing
experience, training, and education in the required services. Identify staff
experience working with governmental entities and list those projects.
B. Include an affirmative action plan for all personnel.
Tab 6- Proposed Subcontractors
Include a listing of proposed subcontractors. Delineate those subcontractors
who are Disadvantaged Business Enterprises, as defined in 49CFR23, and
such other minority, woman -owned and small business enterprises.
Tab 7 - Pricing Schedule
A. Each Prospective Contractor must complete, execute, and submit the
Proposal Form included herewith.
B. The Pricing Schedule attached hereto shall be submitted and shall include
all costs associated with the performance of the contract including travel
and out-of-pocket expenses. The contractor will be responsible for all costs
associated with ineligible debris.
Tab 8 — References
Contractor shall provide at least five (5) governmental entity references for
which the firm has performed similar work of the same or similar
magnitude to those requested in this solicitation, including the contact
name, entity, address, telephone number, e-mail address, and date and term
of the contract and at least five letters of reference from previous clients
Tab 9 — Insurance
Attach evidence of required insurance in the amounts indicated. If
available, a properly completed ACORD Form is preferable.
Tab 10- Financial Statements
All Prospective Contractors shall supply an audited, financial statement for
each of the past two years. A third party prepared financial statement is
acceptable for one of the two years if an audited statement is not available.
Any such third party certified statement shall be signed and certified by the
third party Certified Public Accountant (CPA) and signed and certified as
accurate by the Prospective Contractor.
Tab II- Addenda
Contractor is responsible for contacting Owner to identify any Addenda's
issued for this Request for Proposal. Any Addenda issued subsequent to
the release of this solicitation must be acknowledged by signature of the
authorized representative of the Prospective Contractor, and a copy in
provided in this section.
Tab 12 — Exceptions
Page 10 of 73
Include any/all exceptions taken to the content of the solicitation itself or
any contract or legal agreement(s) or document(s) related to the
solicitation. Any exceptions shall be reviewed by Owner for
appropriateness and is only valid if accepted in writing by Owner.
Tab 13 — Litigation: Prospective Contractors
Contractors shall provide all judgments entered into against the Prospective
Contractor by any Federal, State or Local Courts within the past ten (10)
years; any criminal conviction ever issued against the Prospective
Contractor or its owners or principals, and all civil, criminal and
administrative proceedings pending against the Prospective Contractor at
this time.
Tab 14 — Bonding Capacity
Include an executed Letter of Commitment, proof of bonding capacity
issued by the Surety Company for the Payment and Performance Bond, per
the attached sample letter.
7. PROPOSAL EVALUATION: The Owner shall award to the responsive and
qualified proposer(s) whose proposal is determined to be the most
advantageous to the Owner. Evaluation of proposals shall be based on the
evaluation factors set forth in the Request for Proposals and any other relevant
information obtained through the evaluation process, and the interviews, if
held.
8. EVALUATION CRITERIA: The evaluation criteria define the factors that
will be used by the evaluation committee to evaluate and score responsible and
qualified proposals. Prospective contractors shall include sufficient
information to allow the evaluation committee to thoroughly evaluate and
score their proposals. Each proposal submitted shall be evaluated and ranked
by an evaluation committee. The contract will be awarded to the most qualified
contractor per the evaluation criteria listed below.
Qualifications of the Contractor................................................25%
• Number of years of experience in disaster response: company and/or
predecessors most have at least 5 years of experience in this field; more
preferred
• List similar projects your company has completed in the last five years.
• Degree of experience in all areas of emergency response, management and
recovery
• Experience with FEMA reimbursement programs and funding issues
• Proof of satisfactory or better performance on contracts of similar scope
and size: references and letters of reference must verify successful
completion of similar projects
• In house client training capabilities: provide certification of emergency
management training
Qualifications of staff.............................................................20%
• Assurance of dedicated project team
Page 11 of 73
Experience of key team members in area identified under experience of
prospective contractor: identify senior and project management
Affirmative Action of prospective contractor: describe local and minority
subcontracting plan
Education and experience of prospective contractor personnel: provide
brief resumes
Technical Ap rp oach......................................................15%
• Experience of prospective contractor in previous similar projects
• Technical approach of the prospective contractor to mobilize and perform
the many aspects of the work
• Ability to respond in a timely manner with the necessary resources
Financial Stabilitv..................................................................15%
• Ability of prospective contractor to continue to proceed until funding
becomes available
• Previous financial handling of multiple contracts in multiple disasters
Invoicing program
History of satisfactory payment procedures of subcontractors
Price.................................................................................10%
• Pricing schedule will be evaluated for reasonableness
• All line items must be priced exactly as quoted within the RFP
Regardless of any alternates which may be proposed
Technical and Reimbursement Assistance.....................................15%
• Experience of prospective contractor in relation to tracking, recording, and
data processing
Prospective contractors knowledge and experience of Federal
reimbursement guidelines
Experience in emergency debris management plan preparation
9. WRITTEN REQUESTS FOR INTERPRETATIONS/CLARIFICATIONS
No oral interpretations will be made as to the meaning of specifications or any
other contract documents. All questions pertaining to the terms and conditions
or scope of work of this RFP must be sent in writing (mail, email or fax) to the
Owner and received no later than five (5) days prior to the proposal due date.
Responses to questions may be handled as an addendum if the response would
provide clarification to requirements of the proposal. All such addenda shall
become part of the contract documents. The Owner will not be responsible for
any other explanation or interpretation of the RFP made or given prior to the
award of the contract. The Owner will not respond to questions received after
the specified deadline.
10. ORAL PRESENTATION: An oral presentation of proposal may be
requested of any Prospective Contractor at the Evaluation Committees
discretion. Contractors are cautioned not to assume that presentations will be
required and should include all pertinent and required information in their
original proposal package.
Page 12 of 73
11. WITHDRAWAL OF PROPOSAL: The Proposal may be withdrawn by the
Proposer by means of a written request, signed by the Proposer or its duly
authorized representative. Such written request must be delivered to the place
specified in the Request for Proposals/Advertisement for the receipt of
Proposals prior to the scheduled closing time for receipt of Proposals.
Modifications will not be accepted or acknowledged after the date and time for
submission of proposals.
12. ACCEPTANCE/REJECTION: The Owner reserves the right to accept or
reject any or all proposals received as a result of this RFP, or to negotiate
separately with competing contractors, and to waive any informalities, defects,
or irregularities in any proposal, and to accept that proposal or proposals, which
in the judgment of the proper officials, is in the best interest of the Owner.
13. ACCEPTANCE PERIOD: Any proposal in response to this solicitation shall
be valid for 120 calendar days. At the end of this time the proposal may be
withdrawn at the written request of the Prospective Contractor if no award has
been made. If the RFP is not withdrawn at that time, it shall remain in effect
until an award is made or the solicitation is cancelled. The Owner reserves the
right to request an extension of the period of validity the proposals if the
contract has not been negotiated within 120 days from the submittal date of
the RPF.
14. TIME LINE:
Following is a listing of actions and anticipated dates; the Owner reserves the right
to change the dates, if necessary.
Advertising & Publislring RFP
March 24, 2013 and
March 31, 2013
Deadline for Notice of Intent
April 5, 2013
Deadline for Questions/Clarifications
May 10, 2013
Proposal Submittal Date Deadline
May 15, 2013 @ 2:00 PM
15. CONTRACTOR'S CERTIFICATION AND RESPONSIBILITY:
By submitting a proposal, Prospective Contractors represent that:
A. The Prospective Contractor has fully read and understands the RFP in its
entirety, has fully read and understands the proposal method, the evaluation
criteria and has full knowledge of the scope, nature, and quality of work to
be performed. The Prospective Contractor's proposal is made in
accordance therewith.
B. The Prospective Contractor possesses the capabilities, experience,
resources, financial wherewithal, and personnel necessary to provide
efficient and successful services as set forth in the Scope of Services to the
Owner, and;
C. Before submitting a proposal, each Contractor shall make all investigations
and examinations necessary to ascertain site and/or local conditions and
Page 13 of 73
requirements affecting the full performance of the contract and to verify any
representations made upon which the Contractor will rely. If the Contractor
receives an award because of its proposal submission, failure to have made
such investigations and examinations will in no way relieve the Contractor
from its obligations to comply in every detail with all provisions and
requirements of the contract, nor will a plea of ignorance of such
conditions and requirements be accepted as a basis for any claim by the
Contractor for additional compensation or relief.
16. COSTS INCURRED BY PROPOSERS: All expenses involved with the
preparation and submission of proposals to the Owner, or any work performed
in connection therewith, shall be borne solely by the Prospective Contractors.
No payment will be made for any responses received, or for any other effort
required of, or made by, Prospective Contractors in responding to this RFP.
17. CONTRACTOR'S PERSONNEL:
A. The Contractor represents that it has or shall secure at its own expense, all
necessary personnel required to perform the services under the resulting
contract. Such personnel shall not be employees of or have any contractual
relationship with the Owner.
B. The Contractor shall be responsible for ensuring that its employees, agents,
and subcontractors comply with all applicable laws and regulations and
meet all federal, state, and local requirements related to their employment
and position. The Owner reserves the right to require the Contractor to
remove any employee from working on the resulting contract, which the
Owner deems incompetent, careless, or otherwise objectionable.
C. The Contractor certifies that it does not and will not during the
performance of the contract employ illegal alien workers or otherwise
violate the provisions of the Federal Immigration Reform and Control Act
of 1986, as amended.
D. During the performance of the contract, the Contractor agrees to the
following:
1. The Contractor shall not discriminate against any employee or
applicant for employment because of race, religion, color, sex, age,
handicap, or national origin, except when such condition is a bona fide
occupational qualification reasonably necessary for the normal
operations of the Contractor.
2. The Contractor, in all solicitations or advertisements for employees
placed by or on behalf of the Contractor, shall state that such
Contractor is an Equal Opportunity Employer.
3. The Contractor and any subcontractor shall pay all employees working
on this contract not less than minimum wage specified in the Fair Labor
Standards Act (29 CFR 510-794) as amended.
Page 14 of 73
18. RESERVATION OF OWNER'S RIGHTS: In addition to all other rights
provided the Owner under State law, the Owner specifically reserves the
following rights:
A. Owner reserves the right to rank firms and negotiate with the highest
ranked firms in accordance with the Evaluation Criteria set forth herein.
Negotiation with an individual prospective Contractor does not require nor
prohibit negotiation with others.
B. Owner reserves the right to select the proposal that it believes will serve the
best interest of Owner.
C. Owner reserves the right to reject any or all Proposals.
D. Owner reserves the right to cancel the entire Request for Proposal or to
cancel the award of any Contract at any time before the execution of such
Contract by all parties without any liability.
E. The Owner reserves the right to waive any informality, irregularity or
immaterial error in the Request for Proposal or in any Proposal received, or
reject any and/or all Proposals, or re -advertise.
F. Owner reserves the right to request any necessary clarifications or proposal
data without changing the terms of the proposal.
G. Owner reserves the right to select a Contractor(s) on the basis of the
original proposals without negotiation.
H. All proposals received from Contractors in response to this Request for
Proposal will become the property of the Owner and will not be returned to
the proposers. In the event of contract award, all documentation produced
as part of the contract will become the exclusive property of the Owner.
I. In the event only one responsive proposal is received, the Owner reserves
the right to award to the sole proposer; re -advertise the Request for
Proposal, with or without making changes to the evaluation factors; or elect
not to proceed.
For and in consideration of the Owner considering Proposals submitted, the Proposer,
by submitting its Proposal, expressly waives any claim to damages of any kind
whatsoever, in the event the Owner exercises its right to cancel the award in
accordance herewith.
The Owner reserves the right to select, from among the various Proposal alternates,
those alternates to be included in the final Contract as well as the right and option to
award or re -solicit Proposal alternates in any sequence or at any time deemed to be in
the best interest of the Owner.
19. SUBCONTRACTING:
A. Contractor shall not employ any subcontractor, supplier, or other person or
organization whether initially or as a substitute, against whom the Owner
Page 15 of 73
may have reasonable objection. The Contractor shall not be required to
employ any subcontractor, supplier, or other person or organization to
furnish or perform any of the work against whom the Contractor has
reasonable objection. The Contractor shall provide an opportunity for local
subcontractors, minority and Disadvantaged Business Enterprises (DBE's)
subcontractors to participate in the work.
B. All subcontractors, suppliers, or other persons or organizations (including
those who are able to furnish the principal items of materials or equipment)
shall be submitted to the Owner for acceptance if requested by Owner. The
Owner's acceptance, in writing, of any such subcontractors, suppliers, or
other person or organization so identified may be revoked on the basis of
reasonable objection after due investigation, in which case the Contractor shall
submit an acceptable substitute. No acceptance by the Owner of any such
subcontractor, supplier, or other person or organization shall constitute a
waiver of any right of the Owner to reject defective work. Action by the
Owner awarding a Contract to a firm that has disclosed its intent to assign
or Subcontract in its response to the RFP, shall constitute approval thereof.
C. The Contractor shall be fully responsible to the Owner for all acts and
omissions of the subcontractors, suppliers, or other persons, or
organizations performing or furnishing any of the work under a direct or
indirect contract with the Contractor just as the Contractor is responsible for
the Contractor's own acts and omissions. Nothing in the resulting contract
documents shall create for the benefit of any such subcontractors, suppliers,
or other persons, or organizations, any contractual relationship between the
Owner and any such subcontractors, suppliers, or other persons or
organizations, nor shall it create any obligation on the part of the Owner to
pay or to see to the payment of any money due any such subcontractors,
suppliers, or other persons, or organization, except as may otherwise be
required by laws and regulations.
D. The Contractor shall be solely responsible for scheduling and coordinating
the work of subcontractors, suppliers, or other persons, or organizations
performing or furnishing any of the work under a direct or indirect
contract with the Contractor. The Contractor shall require all
subcontractors, suppliers, or other persons, or organizations performing or
furnishing any of the work to communicate with the Owner through the
Contractor.
E. All work performed for the Contractor by a subcontractor or supplier shall
be pursuant to an appropriate agreement between the Contractor and the
subcontractor or supplier that specifically binds the subcontractor or supplier
to the applicable terms and conditions of the resulting contract for the benefit
of the Owner.
20. DISADVANTAGED BUSINESS ENTERPRISE PROGRAM: The Owner
promotes policies which assure and encourage the full participation of
Disadvantaged Business Enterprises (DBE) in the provision of goods and
services.
Page 16 of 73
Disadvantaged Business Enterprises, as defined in 49 CFR 23, shall have equal
opportunity to compete for and perform subcontracts which the contractor
enters into pursuant to this contract. The Contractor shall use their best efforts
to solicit bids from and to utilize DBE subcontractors or subcontractors with
meaningful minority group and female representation among their employees.
21. CONTRACT: The contents of this REP and all provisions of the successful
proposal deemed pertinent by the Owner may be incorporated into a contract
and become legally binding when approved and executed by both parties.
Contents of the Contract may contain changes from the Owner's perspective as
a result of the REP process and proposal(s) received. The final negotiated
contract may include the scope of work as outlined in this REP along with the
successful Contractor's submittal and any additions or deletions made at the
discretion of the Owner as a result of this RFP process. The Contract will be a
standby contract for use in dealing with response to emergency situations. Work
related to the Contract shall commence upon issuance of a Notice to Proceed.
22. PROPRIETARY INFORMATION:
Proposers should be aware that the Request for Proposal and the responses
thereto are in the public domain. However, the proposers may identify
specifically any information contained in their proposals which they consider
confidential and/or proprietary and which they believe to be exempt from
disclosure, citing specifically the applicable exempting law.
A. All proposals received from proposers in response to this Request for
Proposal will become the property of the Owner and will not be retuned to
the proposers. In the event of contract award, all documentation produced
as part of the contract will also become the exclusive property of the
Owner. The Owner has the right to use any or all ideas presented in any
reply to this REP. Selection or rejection of any proposal submitted does not
affect this right.
23. LICENSES AND CERTIFICATES:
A. The Owner reserves the right to require proof that a Prospective Contractor
is an established_ business operating in compliance with the law.
B. Each Prospective Contractor shall be licensed and qualified to do business
in its area of expertise. Each firm shall submit with their proposal a copy
of, and maintain the appropriate licenses and certificates during the term of
any resulting contract, and any extensions.
C. The Contractor is to procure all permits, licenses, and certificates, or any
such approvals of plans or specifications as may be required by federal,
state and local laws, ordinances, rules, and regulations, for the proper
execution and completion of the Work under this Agreement.
24. CONTINUING THE WORI{: The Contractor shall carry on the work and
adhere to the progress schedule during all disputes or disagreements with the
Owner. No work shall be delayed or postponed pending resolution of any
disputes or disagreements, except as the Owner and Contractor may otherwise
agree in writing.
Page 17 of 73
25. WAIVER OF CLAIMS: Once any contract resulting from this RFP expires, or
final payment has been requested and made, the respective Contractor shall have
no more than ninety (90) calendar days to present or file any claims against the
Owner concerning such contract and thereafter, such claim shall be deemed
waived.
26. CHANGE IN SCOPE OF WORK
A. The Owner may order changes in the work consisting of additions,
deletions, or other revisions within the general scope of the contract. No
claims may be made by the Contractor that the scope of the project or of
the Contractor's services has been changed, requiring changes to the amount
of compensation to the Contractor or other adjustments to the contract,
unless such changes or adjustments have been made by written amendment
to the contract signed by the Owner and Contractor. It is noted that this is a
unit price contract and nothing herein shall limit the number of units of
work which may be required by a disaster. Once issued a Notice to Proceed
(NTP), unless limited by area or amount, the Contractor shall proceed at
the daily directive of the Owner with the entire work required hereunder.
B. If the Contractor believes that any particular work is not within the scope of
work of the contract, is a material change, or will otherwise require more
compensation to the Contractor, the Contractor must immediately notify the
Owner's Representative in writing of this belief. If the Owner's
Representative believes that the particular work is within the scope of the
contract as written, the Contractor will be ordered to and shall continue with
the work as changed and at the cost stated for the work within the scope. The
Contractor may then assert its right to an adjustment under the terms and
conditions set forth herein for claims.
C. The Owner reserves the right to negotiate with the awarded Contractor(s)
without completing the competitive RFP process for materials, products,
services, and/or items similar in nature to those specified within this RFP for
which requirements were not known or realized at the time of issuance of
the RFP.
D. The Contractor shall commence performance on the date set forth in the
Notice to Proceed which date shall be determined by the Owner prior to,
during or after any disaster.
E. The Contractor shall, after Notice to Proceed and with the Owner's
direction, provide a work plan showing where operations will begin and
which streets/roads will be cleared on a daily basis. The plan will be
updated each day of operation. Contractor shall provide a computerized
daily update of progress, showing the streets cleared by web map, the
volumes recovered, the location of crews, and the estimated percentage
completion. Such program shall be web based, and shall be accessible by
the Owner with a password provided by Contractor or as an active website
available without password to the public, as instructed by the Owner.
Page 18 of 73
Contractor shall provide examples of such work plan, their web based
programs, their plans for its use, and the hosting thereof in their proposal.
27. USE OF PREMISES:
A. The Contractor shall assume full responsibility for any damage to any work
areas or to the owner, homeowner, or occupant thereof, or of any adjacent
land or areas, resulting from the performance of the work. Contractor shall
maintain a toll -free hotline answered 24 hours per day to professionally
accept homeowner and other claims. Contractor shall provide in its
proposal, a summary of and sample computerized documents exhibiting its
complete claim resolution program to include computerized complaint logs,
complaint report forms, site visit and inspection forms, and computerized
resolution reporting forms and summaries for the Owner. Should any claim
be made by any such owner or occupant because of accident, intentional
act, the performance of the work, or for any other such reason the cause of
which is the Contractor or their Subcontractors, Agents or Employees, the
Contractor shall promptly settle with such party by negotiation or
otherwise resolve the claim by arbitration or other dispute resolution
proceeding or at law. Contractor shall provide a weekly computerized
update of all claims and complaints and their disposition, both
individually and in summary form.
B. During the progress of the work, the Contractor shall keep their sites free
from accumulations of waste materials, rubbish, and other debris resulting
from the work. At the completion of the work, the Contractor shall remove
all waste materials, rubbish, and debris from and about the sites, as well as
tools, appliances, equipment, machinery and/or surplus materials.
C. The Contractor shall take care to monitor and make every effort to prevent
or mitigate spills of petroleum products and hydraulic fluids. Any such
spills shall be remediated immediately by the Contractor.
D. No tracked equipment shall be allowed on public streets or R.O.W.'s
without the written permission of the Owner.
28. ESTIMATED QUANTITIES: The Owner reserves the right to increase or
decrease estimated quantities as required. Estimated quantities as shown within
this RFP are for estimating and proposal purposes only. It is understood by all
Prospective Contractors that these are only estimated quantities and the Owner
is not obligated to purchase any minimum or maximum amount during the life
of the contract. The actual volumes of any work can only be identified
subsequent to a disaster, and as the work proceeds. The Contractor shall be
required to perform all work required by the Contract regardless of volume.
29. PERFORMANCE: The selected Contractor shall perform the resulting
contract in a timely fashion. If the disaster is such that it may reasonably be
predicted in advance, Contractor shall have Management personnel within the -
Emergency Operations Center (EOC) 24-48 hours prior to the arrival of the
disaster. If the disaster is such that the disaster could not be predicted, the
Page 19 of 73
Contractor shall have Management personnel within the EOC within 24 hours
after the event. Contractors Management personnel shall assist the Owner to
plan a response, plan for the arrival of the event if possible, and to initiate the
Emergency Push and initial debris removal and rescue operations. Contractor
shall mobilize work crews and heavy equipment within such period of time as
may be set forth within the Notice to Proceed. Crews shall be mobilized in a
staggered phasing so as not to overwhelm the resources of the monitoring
body.
Contractor shall describe its mobilization program and past experience with
such mobilization. Contractor should clearly exhibit experience in large
previous compelling mobilizations, to multiple sites, with short time frames.
30. PAYMENT AND PERFORMANCE BONDS/ SURETY LETTER: The
successful bidder shall be required to provide payment and performance
(surety) bonds for the entire amount of the Contract price to insure the
successful performance of the terms and conditions of the contract. The
payment and performance bond shall be subject to forfeiture for failure on the
part of the successful bidder to perform its obligations under the contract. The
bond must be provided within seven (7) days of written Notice to Proceed.
The payment and performance bond is to be secured from a surety or insurance
company listed on the U.S. Department of the Treasury Financial Management
Service list of approved bonding companies which is published annually in the
Federal Register, with at least an A -rating in the latest printing of the A.M.
Best's key rating guide, to write individual bonds up to ten percent of
policyholders' surplus as shown in the A.M. Best's key rating guide and is
licensed in this State to write surety bonds.
As this Contract is on a Standby Emergency Basis, the Owner must be certain
that the offeror has the capability to obtain, within a few days, in the face of a
major disaster, a surety bond to cover the extensive Emergency work which
may be required and which work must be initiated almost immediately.
Therefore, to ensure such capability, the Owner requires the Proposed
Contractor to provide a signed Letter of Commitment from their surety
company meeting the requirements delineated above, with their proposal in the
form and containing the required terms and conditions as set forth herein. The
Letter of Commitment shall exhibit clearly the proposed Contractor's ability to
obtain, and upon a valid Notice to Proceed, the surety's obligation to provide, a
surety Payment and Performance bond for the Project for an amount up to
$10,000,000.00. The Owner reserves the right to seek clarifications to satisfy
the requirements of the commitment letter. See the attached sample Surety
Commitment letter. Failure to include an appropriate executed letter from the
surety in acceptable format shall be grounds for rejection of the Proposal.
31. PAYMENTANVOICES: All Prospective Contractors must specify on their
Proposal letter the exact company name and address which must be the same
as shown on invoices submitted for payment. Contract payments shall be made
in arrears, within fifteen (15) days after approval of a billing statement for
actual work done by the Contractor(s). All billing statements or invoices
Page 20 of 73
submitted for payment shall be original and should be sent to Owner at the
following address:
City of Sanger
Attention City Manager
PO Box 1709
Sanger, TX 76266
Billing statements or invoices should include company name and address,
locations of where work has been performed, reconciliation sheets for each
day's work, and support documentation as required. The successful Contractor
will be responsible for all work and/or debris deemed ineligible. Retainage will
be withheld from each contract payment in the amount of ten (10 %) percent.
Retainage will be released upon the completion of the project including the
resolution of all complaints, but not sooner than 90 days after the completion
of all contract work to insure timely completion of the project and/or discovery
of damage to public or private property. Contractor shall also submit executed
lien. If Retainage exceeds Five Hundred Thousand ($500,000) Dollars, it shall
no longer be collected or withheld.
Invoices submitted for payment shall be accompanied by an electronic
worksheet, in Microsoft Excel format, which includes information contained in
the approved worksheets and/or debris ticket. The final format of the daily
worksheet and information to be contained will be approved and agreed upon
by the Contractor and the Contract Administrator. Any discrepancies between
the Owner's records and the Contractor's submittals must be rectified, to
Owner's satisfaction, by the Contractor, before payment on those items will be
made by the Owner. Contractor shall computerize all tickets daily and present
to the Owner as a summary reconciliation document within (48) hours of the
daily completion of the work. Contractor shall note that thousands to tens of
thousands of tickets may be produced per day and Contractors plans and
computer program must encompass such potential volumes. Contractor should
provide sample forms and program formats, describe their data processing
experience, their data management center (if any), their data management
programs and procedures and their key data management personnel in their
proposal.
Owner and Contractor shall meet daily (within 48 hours of the issuance of the
tickets) to reconcile tickets and work performed. Contractor shall revise the
computerized reconciliation sheets with any corrections discovered and re-
present a corrected Daily Reconciliation sheet to the Owner for signature
within twenty-four (24) hours thereafter. Both the Owner and the Contractor
shall execute each Daily Reconciliation sheet after being verified as correct.
Such Daily Reconciliation sheets shall then become the basis for billing
documentation.
Failure of contractor to keep adequate records as required in this proposal will
result in delay or denial of payment by Owner.
32. RECORDS AND RIGHT TO AUDIT: The Contractor shall maintain
adequate records, documents, and information to justify all charges, expenses
Page 21 of 73
and costs incurred in performing the work for at least five (5) years after
completion of this contract. The Owner shall have access to such books,
records, and documents as required in this section for the purpose of
inspection, reproduction, audit, and/or during normal business hours, at the
Owner's expense, upon five (5) days prior written notice.
33. SAFETY: The Contractor shall take reasonable precautions for the safety of,
and shall provide all reasonable protection to prevent damage, injury or loss to,
its employees on the job, and others. The Contractor shall comply with all
applicable provisions of federal, state, and municipal safety laws, insurance
requirements, standard industry practices, the requirements of the operations and
this contract. The Contractor, directly or through its subcontractors, shall erect
and properly maintain at all times, as required by the conditions and progress of
the work, necessary safeguards for the safety and protection of the public,
including securing areas, posting danger signs, placarding, labeling, or posting
other forms of warning against hazards. When use of hazardous materials or
equipment or unusual methods are necessary for execution of the work, or
when the work includes the cleanup, remediation, and/or removal of bio-solids,
bio-hazardous waste, or any hazardous or toxic materials, trash debris, refuse, or
waste, the Contractor, its subcontractor(s) and their employees shall be trained
and certified as required in the proper handling, use and care of equipment,
materials, and hazardous operations, and shall exercise the utmost care and
perform such activities under the supervision of properly qualified and/or
competent personnel.
34. INSURANCE REQUIREMENTS:
A. Prior to the time Contractor is entitled to commence any part of the project,
work or services, Contractor shall procure, pay for, and maintain at
minimum the following insurance coverage's with the stated limits or
greater. Said insurance shall be evidenced by delivery to the Owner of (1)
certificates of insurance executed by the insurers listing coverage's and
limits, expiration dates and terms of policies and all endorsements whether
or not required by the Owner, and listing all carriers issuing said policies;
and (2) upon request a certified copy of each policy, including all
endorsements. The insurance requirements shall remain in effect
throughout the term of this Contract and any additional extensions. In
addition, the Owner reserves the right to request physical evidence of this
coverage by requesting the policy declaration page, and/or an estopped
from the agent and/or company verifying the coverage is and/or has been
continually in effect.
The Contractor shall secure and maintain, at its sole cost and expense
during the contract term and any subsequent extensions, the following
insurance:
1. Commercial General Liability - in the amount of one million dollars
($t,000,000.00) aggregate/one million dollars ($1,000,000.00) per
occurrence. The General Aggregate limit shall either apply separately
to the resulting contractor or shall be at least twice the required
occurrence limit.
Page 22 of 73
2. Comprehensive Automobile and Water Vehicle Liability - covering
any automotive equipment to be used in performance of the service,
with a minimum limit in the amount of one Million dollars
(1,000,000.00) per occurrence combined single limit / Any Auto.
Physical Damage Insurance covering owned or rented machinery, tools,
equipment, office trailers, and vehicles.
3. Worker's Compensation - Proposer shall provide a policy with
employers liability coverage with limits of not less than one million
dollars ($1,000,000.00) per occurrence for each accident or illness. The
Worker's Compensation policy shall state that it cannot be cancelled or
materially changed without first giving thirty (30) days prior notice
thereof in writing to the Owner. Firms that have owner/operators that
have filed a "Notice of Election to be Exempt" shall supply a signed
copy of said notice.
Any such exemption shall meet the requirements that qualify for an
exemption under the applicable Worker's Compensation law.
4. Pollution and Remediation Liability
A. Limits: with limits of not less than one million dollars ($1
000,000.00) annual aggregate / five hundred thousand dollars
($500,000.00) per occurrence, including the cost of defense during
the term of the contract and for a period of five (5) years following
the completion thereof. Such coverage shall include, but not be
limited to:
1. Pollution Legal Liability- (legal liability arising out of the
discharge, dispersal, release, seepage, migration or escape of
smoke, vapors, soot, fumes, acids, alkalis, toxic chemicals,
liquids or gasses, hazardous materials, waste materials, or other
irritants, contaminants, pollutants, into or upon the land, the
atmosphere, or any watercourse or body of water, including
groundwater at, under, or emanating from the work).
2. Remediation Legal Liability Expense - expenses incurred for
or in connection with investigation, monitoring, removal,
disposal, treatment, or neutralization of a condition arising from
the discharge, dispersal release, seepage, migration, or escape
of smoke, vapors, soot, fames acids, alkalis toxic chemicals,
liquids or gases, hazardous materials, waste materials, or other
irritants, contaminants, or pollutants into or upon the land, the
atmosphere, or any watercourse or body of water, including
groundwater at, under, or emanating from the work, as well as
the cost to repair or replace real or personal property damaged
during the course of Remediation Expense in order to restore
the required Federal, State, Local, or Provincial laws,
ordinances, regulations, or statutes, or any subsequent
amendments thereof, and
Page 23 of 73
3. Transportation Legal Liability / Expense Pollution Legal
Liability or Remediation Legal Liability/Expense arising out of
the movement by the Contractor of product or waste of the
Owner to its final delivery point as specified in the resulting
contract.
Contractor agrees that the insurer shall waive it rights of
subrogation, if any, against the Owner on Commercial General
Liability and Worker's Compensation insurance coverage. The
ACORD Certificate of Liability Insurance, with endorsements,
shall be completed by the authorized Agent and returned to the
Owner.
Loss Deductible Clause: The Owner shall be exempt from, and in
no way liable for, any sums of money that may represent a
deductible in any insurance policy. The payment of such
deductible shall be the sole responsibility of the Contractor
The Contractor shall promptly remedy damage and loss to
property caused in whole or in part by the Contractor, its
subcontractors of every tier, anyone directly or indirectly
employed by any of them, or anyone for whose acts they may
be liable.
B. Conditions:
Each insurance policy shall include the following conditions by
endorsement to the policy:
1. Each policy shall require that thirty (30) days prior to
expiration, cancellation, nomenewal or any material change in
coverage's or limits, a notice thereof shall be given to the Owner
by certified mail to: Contractor shall also notify the Owner, in a
like manner, within twenty-four (24) hours after receipt, of any
notices of expiration, cancellation, non -renewal, or material
change in coverage received by said Contractor from its insurer;
and nothing contained herein shall absolve the Contractor of
this requirement to provide notice.
2. Companies issuing the insurance policy, or policies, shall have
no recourse against the Owner for payment of premiums.
3. The term "Owner" shall include all Authorities, Boards,
Bureaus, Commissions, Divisions, Departments, and Offices of
the County and individual members, elected officials,
employees thereof in their official capacities, and/or while
acting on behalf of the Owner.
4. Owner shall be named as an additionally insured on all policies
of insurance. The policy clause "Other insurance" shall not
apply to any insurance coverage currently held by the Owner to
Page 24 of 73
any such future coverage, or to the Owner's Self Insured
Retentions as, if any, of whatever nature.
C. Subrogation:
Contractor hereby waives subrogation rights for loss or damage
against the Owner.
35. PUBLIC ENTITY CRIMES: All Proposers are hereby notified that a person
or affiliate, who has been placed on the convicted vendor list, or the Federal
suspension and/or debarment list, may not submit a proposal under this
Request for Proposal. By submitting this Proposal, the Proposal Contractor
certifies they are not suspended or debarred nor does their submittal violate the
provisions of this paragraph.
36. CONFLICT OF INTEREST: The Contractor shall promptly notify the
Contract Administrator, in writing, by certified mail, of all potential conflicts
of interest for any prospective business association, interest, or other
circumstance, which may influence or appear to influence the Contractor's
judgment or quality of services being provided hereunder. Such written
notification shall identify the prospective business association, interest, or
circumstance, the nature of work that such person may undertake, and request
an opinion of the Owner as to whether the association, interest, or
circumstance would, in the opinion of the Owner, constitute a conflict of
interest. The Owner shall respond to such notification by certified mail within
thirty (30) days.
BY SUBMITTING THIS PROPOSAL, THE CONTRACTOR CERTIFIES
THAT THEY HAVE NO CONFLICT WITH ANY EMPLOYEE, AGENT,
ELECTED OFFICIAL OR OFFICER OF OWNER, NOR ANY OTHER
CONFLICT AS MAY BE SET FORTH HEREIN.
37. COLLUSION: More than one Proposal from an individual, firm, partnership,
corporation, association and/or related parties under the same or different
names will not be considered. If the Owner believes that collusion exists
among Proposers, all Proposals from the suspect firms will be rejected. Related
parties mean Prospective Contractors or the principals thereof, which have a
direct or indirect ownership and/or profit sharing interest in another
Prospective Contractor or Pro -Proposer.
Prospective Contractors shall comply with all local, state, and federal
directives, orders, and laws as applicable to this REP and all resulting
contract(s).
Prospective Contractors, by responding to this RFP, certify that such response
is made without previous understanding, agreement, or connection with any
person, firm, or corporation making a proposal for the same item(s) and is in
all respects fair, without outside control, collision, fraud, or otherwise illegal
action.
Page 25 of 73
38. PROTEST PROCEDURE:
A. PROPOSAL PROTESTS. Any actual or prospective bidder/proposer, who
is allegedly aggrieved in connection with the issuance of a proposal
package or pending award of a contract, may protest to the Owner.
B. REQUIREMENTS TO PROTEST:
a) If the protest relates to the content of the bid/proposal package, a
formal written protest must be filed no later than 5:00 pm on the fifth
full business day after issuance of the proposal package.
b) If the protest relates to the award of a contract, a formal written protest
must be filed no later than 5:00 pm on the fifth business day after the
posting of either the contract award recommendation or the contract
award itself. The formal written protest shall identify the protesting
party and the solicitation involved; include a clear statement of the
grounds on which the protest is based; refer to the statutes, laws,
ordinances, or other legal authorities which the protesting party deems
applicable to such grounds; and specifically request the relief to which
the protesting party deems itself entitled by application of such
authorities to such grounds.
c) A formal written protest is considered filed with the Owner when the
Contract Administrator receives it. Accordingly, a protest is not timely
filed unless it is received within the time specified above. Failure to file
a formal written protest within the time period specified shall constitute
a waiver of the right to protest and result in relinquishment of all rights
to protest by the proposer.
C. SOLE REMEDY. These procedures shall be the sole remedy for
challenging the content of this RFP or the award of a contract. Prospective
Contractors are prohibited from attempts to influence, persuade, or promote
a proposal protest through any other channels or means. Such attempts
shall be cause for suspension of the offending party's proposal and protest.
D. AUTHORITY TO RESOLVE. The Contract Administrator shall resolve
the protest in a fair and equitable manner and shall render a written
decision to the protestant no later than 5:00 pm on the fifth business day
after the filing thereof.
E. REVIEW OF CONTRACT ADMINISTRATOR'S DECISION. The
protesting party may request a review of the Contract Administrator's
decision by delivering a written request by 5:00 pm on the fifth Rill
business day after the date of the written decision. The written notice shall
include any written or physical materials, objects, statements, and
arguments, which the proposer deems relevant to the issues raised in the
request for review. If it is determined that the solicitation or award is in
violation of law or the regulations and internal procedures of the
purchasing department, the Contract Administrator shall immediately
cancel or revise the solicitation or award as the Contract Administrator may
deem appropriate.
Page 26 of 73
If it is determined that the solicitation or award should be upheld, the
Contract Administrator shall issue a decision in writing stating the reason
for the action with a copy furnished to the protesting party and all
substantially affected persons or businesses no later than 5:00 pm on the
fifth full business day after the protest. The decision shall be final and
conclusive as to the Owner unless any further action is taken by the party
making the original protest.
F. STAY OF PROCUREMENT DURING PROTESTS. There shall be no
stay of procurement during protests.
39. AWARD AND TERM: The Owner reserves the right to award a contract or
contracts to the Contractor(s) that the Owner deems to offer the best overall
proposal. The Owner is therefore not bound to accept a proposal on the basis of
lowest price. In addition, the Owner, at its sole discretion, reserves the right to
cancel this RFP, to reject any and all proposals, or to re -advertise with either
the identical or revised specifications, if it is deemed in the best interest of the
Owner to do so. The Owner also reserves the right to make multiple awards,
based on experience and qualifications if it is deemed to be in the Owner's best
interest. At the discretion of the Owner, the successful Contractor(s) may be
awarded a contract for five (5) years with five (5) subsequent one (1) year
renewals permissible, upon mutual written agreement and, approval of Owner.
40. JURISDICTION AND VENUE: This Request for Proposal and any resulting
Contract shall be governed in general by the Laws of the State of Texas. This
agreement shall be performed in Denton County, Texas.
41. CHANGE IN ABILITY TO PERFORM: After execution of the contract
and during the life of the contract, Contractor shall notify Owner of any
material change in Contractor's ability to fiilfill any of the requirements of this
contract. Notification shall be in writing and shall be post marked within ten
(10) days of Contractor having knowledge that Contractor cannot fulfill any of
the material requirements of this contract. Upon Notification, Owner shall
have the right to modify or amend the contract or terminate the contract at
Owner's sole discretion by giving written notice to Contractor. The intent of
this clause is to ensure Owner is not legally obligated under a contract for
services that Contractor can no longer supply
Page 27 of 73
SCOPE OF WORK
A. Clearing and /or removing debris from the public right-of-way, streets and roads to a
temporary disposal area (DMS).
This action requires the mechanized loading of various types of debris thereby transporting the load
to a predetermined storage and processing site (DMS). Debris is typically defined as scattered
items and materials broken, destroyed, or misplaced by a natural disaster. Example: trees,
construction and demolition material and personal property. Right-of-way is typically defined as
the portion of land over which a facility, such as highways, railroads, or power lines are built. This
includes land on both sides of the highway up to the private property line.
A-1 — Vegetative Debris - A cubic yardage rate associated with mechanical collection and
transportation of vegetative debris from the public right —of-way to a predetermined disposal area.
Vegetative debris consists of whole trees, tree stumps, tree branches, tree trunks, and other leafy
material. Vegetative debris in this instance has already been separated or requires no separation
and has been placed on the right of way for collection.
A-2 — C&D Debris - A cubic yardage rate associated with the mechanical collection and
transportation of construction and demolition debris from the public right of way to a
predetermined disposal area or landfill. Construction and demolition debris generated by a disaster
includes damaged components of buildings and structures, such as lumber and wood, gypsum
wallboard, glass, metal, roofing material, tile, carpeting and flooring, window coverings, plastic
pipe, filly cured asphalt, heating and ventilating, and air conditioning systems and their
components, light fixtures, small appliances, equipment, furnishings and fixtures. C & D debris in
this instance has already been separated or requires no fiarther separation and has been placed on
the right of way for collection. In some cases this debris may be directed to a final disposal
facility.
B. Management and operation of debris reduction sites in order to accept process and reduce
disaster related debris.
A DMS is a location for the contractor to temporarily store, reduce, segregate, and/or process
debris before it is hauled to its final disposition. They shall be used to reduce debris and increase
the operation's flexibility.
By employing a DMS, the debris can be collected from the right-of-way and public properties in
order to expedite permanent recovery operations. Locations for temporary debris storage and
processing facilities should be identified during the planning process, and a listing included in the
Debris Management Plan. The contractor will be responsible for securing adequate DMS site(s).
These site(s) should allow for the following:
Flexibility of operations. The DMS may also include a collection center for the public's use.
Facilitation of recycling and reduction of debris. Specific reduction, recycling or segregation
needs should be designed into the site.
Expedition of debris collection. Having a site for temporary storage and reduction allows time
for local landfill site preparation before final disposal. The DMS may also be established at a
location central to the disaster event, thereby reducing travel time from the disaster area to the
disposal site.
Identifying Debris Management Sites
Site selection should be based on the following criteria:
• Ownership,
• Size,
Page 28 of 73
• Location, and
• Environmental and historic concerns (baseline study findings).
Ownership
The contractor should possibly consider public lands first in order to avoid costly land leases.
Applicant -owned sites that will not require extensive repair costs, such as parks, vacant lots, or
spoils fields, should be considered as well.
When this is not possible, the contractor should develop criteria for identifying potential private
property locations for the DMS. The successful contractor shall indemnify and hold the
jurisdiction harmless against any damage or environmental claims. The successful contractor
agrees to purchase environmental pollution insurance as defined in the insurance section of this
document.
Land Lease Agreements
The duration of the land lease agreement should be inclusive of all the time the applicant will be
present at the site, beginning with the baseline environmental study and ending once the property
owner takes back legal ownership.
The agreement should include a requirement to conduct a baseline environmental assessment
(phase 1) of the site before the site is occupied and an environmental assessment before returning
the properly back to the owner. Both documents may become an annex to the land lease
agreement.
The land lease agreement should be for a specific time frame with the ability to extend the lease if
debris removal and processing activities are not completed.
Size
The required size of the site will depend on the expected volume of debris to be collected and the
planned volume reduction methods. The DMS can vary in size from 10 to 200 acres. A large
portion of the site will be used for roads, buffers, burn pits, HHW disposal areas, etc. As a general
rule, larger sites mean fewer sites are needed; hence, site closeout is easier.
Location
The DMS should be in an area that does not impede the flow of traffic along major transportation
corridors, disrupt local business operations or cause dangerous conditions in residential
neighborhoods or schools. Whenever possible, avoid locating a DMS near residential areas,
schools, churches, hospitals and other such sensitive areas.
The DMS will need good ingress/egress to accommodate heavy truck traffic. The DMS selection
criteria should consider access to major routes to allow for trucks to transport material to final
disposition locations.
The contractor will need to consider public acceptability when selecting a potential DMS. It will
largely be dependent upon the activities planned for the site. Smoke from burning, around -the -
clock light and noise from equipment operation, dust and traffic are generally tolerated early in a
disaster recovery operation, but may have to be curtailed later. The contractor is strongly
encouraged to notify citizens early about planned site activities and possible ramifications.
Environmental Factors
When selecting public or private sites, pre-existing conditions should be considered because the
sites will have to be restored upon site closeout. Proper management of the site will allow the site
to be closed with manageable efforts. For site closure reasons, the contractor will want to keep
Rom aggravating an existing environmental issue during the debris management operations.
Therefore, a DMS should not be established in an environmentally sensitive area such as wetlands,
historical sites, critical animal and plant habitats, archeological sites, or fresh water well fields.
This applies specifically to any Superfund site or an area within a 100-year flood plain. The
Page 29 of 73
contractor should eliminate all sites that may have any of the listed environmental concerns. If an
environmental concern is found during the baseline data collection process (described below), the
potential site should be eliminated from consideration.
By conducting a baseline data collection study, the contractor is able to further establish the
feasibility of potential sites, document the existing site and vet potential environmental issues.
Data collection will need to be completed prior to establishing the site and continued throughout
the operations. The final assessment should include the same documentation in order to avoid
disagreements of the condition of the site prior to the operations and the condition in which the
property is returned.
Baseline Data Collection
The following actions are suggested to document the baseline data on all selected sites:
Videotape and/or Photograph the Site. Thoroughly videotape and/or photograph (ground or
aerial) each site before beginning any activities. Periodically update video and photographic
documentation to track site evolution.
Document Physical Features. Note existing structures, fences, culverts, irrigation systems
and landscaping that can help evaluate possible damage claims made later.
Historical or Archeological Investigation. Research the properties past use and ownership to
note any issues regarding historical or archeological significance. The contractor may contact
the state historical preservation agency for assistance and notification of intent prior to
assuming ownership through a lease agreement.
Sample Soil and Water. Advanced planning with community and state environmental
agencies can establish requirements, chain of custody, acceptable collection methods, certified
laboratories and testing parameters. If in-house assets are not available, the contractor may
consider establishing a contract with an environmental consulting firm that can respond
rapidly. Soil and groundwater samples should be collected prior to volume reduction
activities. Planned HHW, ash and fuel storage areas should be sampled prior to site setup.
Environmental Monitoring Program
As the operations proceed additional data should be collected throughout the operations for
closeout and quality assurance reasons. The data can be compared to the previously
established information in order to determine any remediation that may be necessary.
1. Sketch Site Operation Layout. DMS operations may grow, shrink, or shift on the site. It
will be important to track reduction, hazardous waste collection, fuel, and equipment storage in
order to sample soil and water for contaminants. Periodically map or sketch activity locations
so that areas of concern can be pinpointed later for additional sampling and testing.
2. Document Quality Assurance Issues. Document contractor operations that will have a
bearing on site closeout, such as petroleum spills at fueling sites; hydraulic fluid spills at
equipment breakdowns; contractor installation of water wells for stock pile cooling or dust
control; discovery of HHW; and commercial, agricultural or industrial hazardous and toxic
waste storage and disposal.
3. Plan Environmental Remediation. Final restoration of the landscape must be acceptable to
the landowner, but within reasonable expectations. Therefore, plan the landscape restoration
as early as possible, preferably incorporating a basic plan in the lease.
Permits
Environmental permits and land -use variances may be required to establish a temporary DMS.
Several agencies may be involved in issuing permits and granting land use approvals. The
planning process should identify the potential permits that will be required to establish a facility. A
listing of the permits should be part of tine Debris Management Plan and may include:
• Waste processing and recycling operations permit
• Temporary land -use permits
• Land use variances
• Traffic circulation plans
• Air quality permits
• Water quality permits
• Coastal commission land -use permits
• Household hazardous waste permits
• Fire department permits
Page 30 of 73
• National Enviromnental Policy Act (NEPA) compliance
Site Preparation
The topography and soil/substrate conditions should be evaluated to determine best site layout.
When planning site preparation, the designer should consider ways to make site closure and
restoration easier. For example, if the local soils are very thin, the topsoil can be scraped to bedrock
and stockpiled in perimeter berms. Upon site closeout, the uncontaminated soil can be re -spread to
preserve the integrity of the tillable soils. Operations that modify the landscape, such as substrate
compaction and over -excavation of soils when loading debris for final disposal, will adversely
affect landscape restoration.
Site Layout
There should be no significant accumulation of debris at temporary storage sites. Debris should be
constantly flowing to incinerators and grinders, or recycled with the residue and mixed construction
and demolition materials going to a landfill. Additional debris management sites may be required
if the actual debris quantities flowing in to the site are greater than the site storage and processing
capacity. The efficiency and the overall success of the DMS operations will be partially
determined by how the site will be designed.
Operational Boundaries
Operational boundaries are the boundaries or areas that clearly define the difference in use areas at
the DMS. In establishing the operation boundaries, the DMS design staff may consider using
earthen berms, temporary barriers, or any other physical restriction. This will aid traffic circulation
and help keep debris amassing at the DMS to a minimum.
Common operational activities are:
• Reduction
• Recycling
• Tipping areas (unloading)
• Loading areas for processed debris to go to its final disposition
• Drop-off centers for the general public (this may include vegetative, recycling, or
construction and demolition debris)
• Household hazardous waste storage
• Monitoring tower locations
• Equipment, fuel, and water storage
The separation between all of the areas listed above will need to be clearly delineated and defined.
As operations proceed the lines may be moved to accommodate either growing demand for space
or reducing in preparation for closure.
The reduction, recycling, tipping, and loading areas will need ample room for large equipment
operations. The design should take into consideration the possibility of multiple pieces of
equipment being in the same activity area at one time. Depending on the scale of operations, each
debris stream may have its own tipping area and should be designed accordingly.
General public drop-off areas for recycling, reduction, and C&D debris may be included within a
DMS. These public use areas should be carefully designed for passenger vehicle traffic and public
safety.
Household hazardous waste storage should be close to the public drop-off center yet restricted so
that qualified personnel may process the waste appropriately. The contractor may consider
constructing an impermeable lining and earthen berms in order to contain spills and prevent surface
water runoff from leaving the area.
Page 31 of 73
Monitoring towers should be located at ingress and egress points. Monitoring towers should be
constructed of durable structural materials and should follow USACE construction criteria
designed to withstand active and static loads.
Equipment and fuel should have a designated storage area and signs posted appropriately. The fuel
storage areas will need to be designed to contain spills. Water should be readily available at all
times. Water storage areas should be strategically positioned throughout the site and identified
appropriately.
Recycling
Hurricanes and earthquakes may present opportunities to contract large-scale recycling operations
and mitigate disposal cost and in some instances create an economic return for the jurisdiction. The
contractor shall attempt to exercise their initiative to segregate and recycle debris as it arrives at the
DMS or landfill.
The decision to recycle disaster debris should be made before collection begins. The jurisdiction
may find that marketing and selling the reduced debris is more financially attractive than hauling
the unreduced debris to a local landfill.
Processing disaster debris through grinding, shredding or any other means without an
understanding of the end -uses and market specifications may result in the products becoming
unusable for its intended purpose and the debris will need to be disposed of. For that reason, it is
incumbent upon the contractor to thoroughly research the market opportunities and establish
criteria to assist emergency personnel in making decisions to recycle certain types of debris.
Common Recyclable Materials
* Metals
Hurricanes and tornadoes can cause extensive damage to mobile homes, sun porches and green
houses. Most of the nonferrous and ferrous metals are suitable for recycling. Metal maulers and
shredders can be used to shred trailer frames, trailer parts, appliances and other metal items.
Ferrous and non-ferrous metals are separated using an electromagnet and then sold to metal
recycling furs.
* Soil
Landslide debris removal operations may include transporting large amounts of soil from the slide
area to the DMS. At the DMS, it is combined with other organic materials that will decompose
over time. This procedure can produce significant amounts of soil that can be sold, recycled back
into the agricultural community, or stored on -site to be used as cover. If the soil is not suitable for
any agricultural or residential use, it may be deemed suitable for use as cover material at a landfill.
* Concrete, Asphalt and Masonry Debris
Concrete, asphalt and masonry products can be crushed and used as base material for certain road
construction products or as a trench backfill. Debris targeted for base materials will need to meet
certain size specifications as determined by the end user.
Traffic Patterns
The traffic circulation will need to be well defined throughout the entire site. Although traffic signs
and barricades aid in directing traffic the planning staff may consider flag personnel to help direct
traffic. Optimally, the designed traffic pattern should allow trucks to enter and exit through
different access points, as long as each is monitored. Haulers are typically paid by the volume of a
load. The load is evaluated when entering the site as a percentage of the full capacity of the truck.
Stationing monitors at ingress and egress points will ensure every truck releases the entire load
prior to leaving the site. This avoids debris left in a truck from a previous load from being courted
again in a subsequent load.
The empty trucks that are entering the site to remove the processed (reduced) debris should enter
and exit through an access point other than that of all other traffic. This will reduce the site
management and debris monitor confusion regarding debris being deposited or leaving the site.
Site Manager
Page 32 of 73
The contractor is responsible for supervising the overall day-to-day operations, maintaining daily
logs, preparing site progress reports and enforcing safety and permitting requirements during site
operations. The contractor is also responsible for scheduling the environmental monitoring and
updating the site layout plan.
Debris Monitors
Monitors should be placed at ingress and egress points in order to quantify debris loads, issue
debris load tickets, inspect and validate truck capacities, check loads for hazardous wastes and
perfornn quality control checks.
Safety Personnel
Safety personnel are responsible for traffic control and ensuring that site operations are in
compliance with the state and federal occupational safety regulations.
Site Closure
When the site operations are complete, the property must be restored to its original condition before
returning the site to the property owner. Restoration of a site involves removing all traces of the
operations and possible remediation of any contamination that may have taken place during the
operations. The site must be brought back to its environmental state, in which it was leased, prior
to it being returned to the owner.
Debris, processing equipment, storage tanks, protection berms, and other structures built on the site
should be removed from the site upon completion of all debris removal and processing operations.
The final environmental site assessment is an extension of the environmental monitoring program.
Similar testing completed in the baseline study will be conducted, and an initial study made to
confirm the site has been returned to its pre -activity state. Test samples should be taken at the same
locations as those of the initial assessment and monitoring program. However, if warranted,
additional test samples may need to be taken at other locations on or off the site.
Based on the results of the testing, additional remediation may be required before the owner will
take final acceptance of the site. The lease agreement should have provisions to release the
contractor from future damages if the site is retuned in its original condition.
B-1 — A cubic yardage rate associated with managing, accepting, processing and reducing
vegetative debris through grinding.
Chipping and grinding operations of vegetative debris should target volume reduction 75 percent.
Since 25 percent of the volume remains from chipping and grinding, the contractor should attempt
to gain benefit of this reduction method by identifying alternate uses of the residual material. The
ability to use recycled wood chips as mulch for agricultural purposes, as fuel for industrial heating,
or in a cogeneration plant helps to offset the cost of the chipping and grinding operation.
If the grinding operation is strictly for volume reduction, size of the mulch is not important;
however, mulch to be used tor agricultural purposes must be of a certain size and virtually free of
paper, plastic and dirt. Because of shallow topsoil conditions in some locations, mulch is a
desirable product. The contractor should work closely with local environmental and agricultural
groups to determine if there is a market for mulch.
Plastics should be eliminated completely. To help eliminate contaminants, root rake loaders should
be used to feed or crowd materials to the chipper or grinder. Hand laborers should remove
contaminants prior to feeding the grinders.
Bucket -loaders tend to scoop up earth, causing excessive wear to the grinder or chipper. Shaker
screens should be used when processing stumps with root -balls or when large amounts of soil are
present in the woody debris. The separated soil should be reused.
Grinding Equipment
Grinders are ideal for use at debris storage and reduction sites because of their high volume
reduction capacity. Chips or mulch should be stored in piles no higher than 15 feet and located so
as not to hinder handing operations. The contractor should locate the grinder after making noise
Page 33 of 73
and public safety considerations. The reduced debris production output should be sufficient as to
not hinder haul in and haul out progress.
B-2 —A cubic yardage price associated with managing, accepting, processing and reducing
vegetative debris through burning,
Incineration
The contractor should target a 95 percent reduction rate through incineration. Local agricultural
extension personnel should be consulted to determine if the resulting ash can be recycled as a soil
additive. This option shall not be used if mixed debris enters the waste stream.
The preferred method of burning shall be air curtain incineration, however controlled open air
incineration may be acceptable under certain conditions and with the authority of the jurisdiction.
Controlled Open -Air Incineration carefully reduces vegetative debris by burning debris within a
contained fixed area. The reduction of clean woody debris presents little environmental damage
and is cost effective.
Air Curtain Pit Incineration offers an effective means to expedite the volume reduction process
while substantially reducing the environmental concerns caused by open-air incineration. The air
curtain incineration method uses a pit constructed by digging below grade or building above grade
(if a high water table exists) and using a blower unit. The blower unit and pit should comprise an
engineered system that must be precisely configured to function properly.
The burning chamber should be no more than eight -feet -wide and nine- to 14-feet-deep. The
length of the pit should vary depending on site size, environmental permitting and labor/equipment
limitations. The contractor shall demonstrate knowledgeable and experienced with air curtain pit
incinerator design and operating procedures.
Portable Air Curtain Incinerators use the same methods as air curtain pit incinerator systems,
except that the portable incinerators use a pre -manufactured pit rather than an onsite constructed
earth/limestone pit. Potable air curtain incinerators are the most efficient incineration systems
available because the pre -manufactured pit is engineered to precise dimensions to complement the
blower system. The pre -manufactured pit requires little or no maintenance as compared to earth or
limestone constructed pits, which are susceptible to erosion. Portable air curtain units are ideal for
areas with high water tables and sandy soils and areas where smoke capacity must be kept to a
minimum.
Environmental and Safety Concerns
With all of the incineration methods, environmental compliance and safety concerns need to be
addressed by the contractor. The contractor must check with appropriate state agencies for state -
specific requirements. The following are setback, permitting, and public information suggestions
to be addressed by the contractor.
Setbacks and buffer zones need to be established within and around the reduction sites not only for
the public safety but also for the safety of the debris operations. A setback of at least 100 feet
should be maintained between the debris piles and the incineration area. It is often suggested that
1000 feet be allowed between the incineration area and the nearest building in order to create a
generous buffer zone for emergency vehicles, if needed. The fire should be extinguished two homy
before anticipated removal of the ash mound. The ash mound should be removed before it reaches
two -feet below the lip of the incineration pit. To prevent explosions, hazardous or contaminated
flammable material should not be placed in the pit. Fencing and signage are simple and effective
means to keep the public away from the incineration area.
Smoke generated by any of the above incineration methods is often interpreted by the general
public as having an environmental impact. Therefore, the contractor should also address smoke as
part of the air monitoring guidelines. The state environmental or forestry agency will have
guidelines that will need to be met in order to acquire and keep a burn permit.
Page 34 of 73
The contractor should take the initiative in keeping the public informed. Local officials,
environmental groups and residents should be thoroughly briefed on the incineration methods being
used, how the systems work, environmental standards, health issues and the risks associated with
the chosen method of incineration.
B-3 —A cubic yardage rate associated with accepting, managing, processing and reduction of
construction and demolition debris thru burning and/or grinding.
This method requires the contractor to utilize best practice methods of efficient separation and
DMS management to process C&D material. Incineration and/or burning requirements described
within shall be observed.
C. Contractor will be considered the owner of all debris brought to a DMS. The contractor must
remove or arrange for the removal and final disposal of all debris, reduced or not, brought to the
DMS. The contractor is responsible to pay all tipping fees in association with the final disposal.
Contractor will provide all required documentation needed to receive reimbursement.
D. Right-of-way (ROW) Stumps - The cost associated with the removal and disposal of
hazardous from the ROW.
A stump may be determined to be hazardous and eligible for reimbursement as a per -unit cost for
stump removal if it meets all of the following criteria which shall be determined by the jurisdiction
or its designated agent:
• It has 50 percent or more of the root -ball exposed (less than 50 percent should be flush cut);
• It is on improved public property or public right-of-way; and
• It poses an immediate threat to life, public health and safety.
The reasonable cost for the stump removal is based on the diameter of the stump measured two feet
fi-om the ground. Stumps measuring 24 inches in diameter or less do not require special
equipment; therefore, reimbursement will be based on the reasonable unit cost per cubic yard, using
the Stump Conversion Table found in Appendix G, FE114 RP 9523.11, Hazardous Stamp
Extraction and Removal Eligibility. The unit price for stump removal includes the extraction,
transport, and disposal of the stump as well as filling the cavity that remains.
The contractor will be compensated at the rate per cubic yard for normal debris removal for all
sharps, regardless of size, placed on the public rights -of -way by others (i.e., contractors did not
extract them fiom public property). In such instances, the contractor did not incur additional costs
to remove these stumps; the same equipment used to pick up vegetative debris can be used to pick
up these stumps.
If the contractor incurs additional costs for removal of a stump measuring more that 24 inches in
diameter that is placed on the right-of-way, a Hazardous Stump Worksheet can be submitted for
reimbursement consideration.
E. Right of way (ROW) cutting partially uprooted at, split trees (leaners)
An eligibility determination shall be made by the jurisdiction or its representative using the
following criteria:
A tree is considered "hazardous" if its condition was caused by the disaster; if it is an
immediate threat to lives, public health and safety, or improved property; and if it is six inches
in diameter or greater, when measured two feet from the ground; and one or more of the
following criteria are met:
• It has more than 50 percent of the crown damaged or destroyed.
• It has a split trunk or broken branches that expose the heartwood.
• It has fallen or been uprooted within a public use area.
• It is leaning at an angle greater than 30 degrees.
Trees determined by the jurisdiction to be hazardous and that have less than 50 percent of the
root -ball exposed should be out flush at the ground level. The cut portion of the tree will be
included with regular vegetative debris. The eligible scope -of -work for a hazardous tree may
include removing the leaning portion and cutting the stump to ground level.
Page 35 of 73
F. Right of way (ROW) removal of dangerous hanging limbs (hangers)
Criteria for the removal of hangers will be determined by the jurisdiction using the following
criteria:
Limbs must be:
• Greater than 2" in diameter
• Still hanging in a tree and threatening a public -use area (traits, sidewalks, golf cart paths)
• Located on improved public property
All hazardous limbs in a tree should be cut at the same time, not in passes for particular sizes.
An eligible scope -of -work will be to cut the branch at the closest main branch junction. Removing
the entire branch back to the trunk is not the preferred method.
G. Debris Removal from Private Property
When requested, Contractor will initiate and manage a Right of Entry (ROE) program to remove
debris on private property and/or demolish private structures that present a public safety hazard.
R.O. E. programs should be managed as follows:
COMMENCEMENT OF R.O.E. PROGRAM
• R.O.E. operations will commence upon receipt of a specific task order and notice to proceed
from Owner.
• R.O.E. operations will proceed in an orderly and manageable fashion on publicly and privately
owned properties as designated by the Owner's task order.
REQUIRED R.O.E. DOCUMENTATION
• Identify affected properties with Govermnent Agency Personnel
• Provide a detailed listing of all affected properties, to include:
A. Description
B. Damages
C. Property Owner with contact information
D. Identification of Task Order
E. Progress of Work
F. Sign -off and release
G. Any peculiarities pertaining to entry or safety
H. Certification that property is vacant and all valuables have been removed if demolition to
occur.
I. Location of unseen obstructions
CONTRACTOR RESPONSIBILITIES
• Obtain signed right of entry agreement from owner to include:
A. Right of Entry Agreement
B. Hold Harmless Agreement (to protect contractor, subcontractors, Comity/City, and FEMA
from claims)
C. Non -duplication of Benefits form to ensure owner does not receive both federal assistance
and insurance proceeds for the same work.
• Assess the property thoroughly with Government Agency and obtain detailed scope of
demolition and/or work to be performed from the Owner for reach site.
• Obtain proper permits and/or Condemnation Certificates for work, if required.
• Prepare drawings and/or photographs of each site from multiple angles to document condition
of property prior to entry.
• Enter photographs into computer under particular ROE file.
• Prepare and maintain computerized schedule and daily progress of work. Update daily for a
continuous mechanism to track programs and completion of all ROE's.
• Owner shall clearly designate and physically make each property to be entered and/or
demolished.
Page 36 of 73
• Clearly locate, mark and/or protect all utilities. Terminate utilities at street if part of task order.
Electricity and gas to be terminated by utility company, if appropriate.
• Contractor is responsible to ensure work is conducted only on those properties designated by
the government.
• Contractor shall be responsible for the safety of all personnel and equipment.
• Contractor will be responsible for personnel and equipment logs, and their distribution to
government, as appropriate.
• Contractor will be responsible to ensure work assignments received are completed to the
requirements of the government task order.
EQUIPMENT
Demolition operations equipment may include but is not limited to the following:
• Track type loaders
• Rubber tire fi•ont end loaders with grapple buckets
• Rubber tire front end loaders with 4 in I bucket
• Rubber tine backhoes with thumb
• Trackhoe and/or excavators
• Dozers
• Other specialized equipment as required.
All equipment used must meet current safety standards.
MAINTENANCE/FUEL VEHICLES AND PERSONNEL
• Maintenance/fuel vehicles will be assigned and manned as needed to provide an adequate
supply of fuel to maintain equipment operations.
• Maintenance/fuel vehicles will be assigned and manned as needed to provide all required field
maintenance to ensure equipment operations.
HAND CREWS
Sufficient laborers with personnel protective gear and sufficient hand tools and/or technician
should accompany each work crew.
OPERATIONS
• Demolition operations will be conducted only on properties as instructed by Owner task orders.
(Utmost care must be exercised to ensure only the authorized and designated properties are entered
and/or structures are demolished and that only the portions of the debris and/or structures as
authorized are removed.]
• All debris will be picked up and loaded into haul trucks in a safe and workman -like manner.
Debris shall be trimmed to ensure a safe load. Safety shall not be compromised.
• All construction and demolition materials shall be sized using heavy equipment to ensure
maximum loading and safe transport of materials within EPA and DOT standards if applicable.
• Obvious hazardous materials shall be dealt with in accordance with the Owner task order.
• Traffic control personnel, with appropriate traffic control and safety equipment, shall be stationed
as appropriate, at each approach point of the work area to maintain traffic control and prevent
personal injury. Additional traffic control personnel will be stationed throughout the area, as
needed, to ensure safe operations.
COMPLETION AND CLOSE OUT
• Upon completion, the property shall be inspected by Owner and preferably by the Property Owner.
• A Completion Certificate should be obtained from the Government Inspectors, signed by them and
preferably the Property Owner.
• Stich Completion Certificate should certify also the lack of damages to the property, to any items
remaining on the property at the instruction of the Government, and the lack of damages to any
adjacent property.
• Upon completion of the work, pictures are taken of the property from the same sides to document
the completion of the ROE.
• The Completion Certificate should be part of the final documentation for payment.
H. Storm Deposited Silt -Canals
Page 37 of 73
Contractor shall remove storm deposited silt from drainage or recreational canals and by use of
marsh buggy equipment, barge mounted equipment and via land based equipment where
accessible. The Owner will direct the Contractor to use the means appropriate for silt removal.
Contractor shall dispose of the silt at either a parish owned site or a site secured and paid for by the
contractor.
Ditch Cleaning
Contractor will remove storm deposited silt and debris from drainage ditches. Contractor shall
dispose of the silt at either a parish owned site or a site secured and paid for by the contractor. The
Contractor will load haul and dispose of debris, either vegetative or C&D at an Owner approved
landfill. The width shall be determined by measuring the ditch from the highest elevation on one
bank to the highest elevation on the opposite bank.
J. Cleaning and Clearing of Drain Lane
Contractor will clear drain lines such that they will be left clean and unobstructed to allow for fill
capacity drainage flow. Contractor shall dispose of the silt at either a parish owned site or a site
secured and paid for by the contractor. The contractor will load, haul and dispose of debris, either
vegetative or C&D at an Owner approved landfill. Measurement shall be by the inside diameter of
the drain line.
K. Cleaning and Clearing of Catch Basins and Inlets
Contractor will clear catch basins and inlets such that they will be left clean and unobstructed to
allow for full capacity drainage flow. Contractor shall dispose of the silt at either aparish owned
site or a site secured and paid for by the contractor. The Contractor will load, haul and dispose of
debris, either vegetative or C&D at an Owner approved landfill.
L. Sand Collection (Public Property) and Screening Rate
Debris -laden sand will be loaded from the public right of way and handed to a designated location
such as a temporary collection site to be dumped. After the debris -laden sand is discharged it shall
be screened and stockpiled at a temporary site(s). After the sand is cleaned it will be returned/
hauled to the beach to be stockpiled for reuse along the shoreline/ beach. Debris generated from
sand screening will be hauled to a debris management site(s) or other designated location according
to debris collection rates.
Sand Collection (Private Property) and Screening Rate
Debris -laden sand will be loaded from private property and hauled to a designated location such as
a temporary collection site to be dumped. The collection of the debris laden sand will be a
coordinated effort between the Contractor, the Owner, and the Property Owner. The Contractor
will bear the responsibility of the documentation and data collection necessary to ensure
reimbursement from FEMA along with administering a successful Right of Entry Program.
Collection of debris -laden sand from private property shall not disrupt or damage the private
property; the sand can only be removed back to the existing grade prior to the event. After the
debris -laden sand is discharged it will then be run through a screen and stockpiled at a temporary
site(s). After the sand is cleaned it will be returned/ hauled to the beach to be stockpiled for reuse
along the shoreline/ beach Debris generated from sand screening will be hauled to a debris
management site(s) or other designated location according to debris collection rates.
M. Contractor shall supply and place suitable fill dirt in ruts created by equipment and vehicles, holes
created by the removal of hazardous stumps and other areas that pose an imminent and significant
threat to public health and safety.
N. Contractor shall remove the carcass of all dead animals and dispose of in accordance with all
federal, state and local rules and regulations.
O. Contractor shall load, haul and store all white goods in accordance with all federal, state and local
rules and regulations.
Page 38 of 73
P. Contractor shall remove and recover Freon from any white goods such as refrigerators, freezers or
air conditioners in accordance with all federal, state and local rules and regulations using
appropriate UL certified recovery equipment and shall be properly recycled.
Q. Sunken Vessel Removal - For Water Based Salvage/Removal Operations of Vessels the contractor
shall have extensive knowledge and experience in marine salvage and marine wreck removal.
Contractor must show experience with numerous salvage/wreck removal contracts and the ability
to quickly mobilize specialized salvage equipment into position. Contractor shall determine and set
froth at the request of Owner the best approach method for recovery or removal of vessels in a
marine environment. Contractor must be capable of providing the following salvage services.
Refloat
1. Determine best approach route to vessel (taking into consideration water depth, width of
channel, marine traffic)
2. Provide salvage equipment and hazardous containment equipment alongside target vessel
3. Secure perimeter of vessel with oil containment boom
4. Secure target vessel with rigging and lifting gear
5. Pump/Lift as determined necessary
6. Repair hull to maintain buoyancy and allow free float
7. Once refloated, inspect for any incoming water
8. Secure vessel to predetermined mooring site.
Stage
1. Determine best approach route to vessel (taking into consideration water depth, width of
channel, marine traffic)
2. Secure salvage equipment and hazardous containment equipment alongside target vessel
3. Secure perimeter of vessel with oil containment boon
4. Secure target vessel with rigging and lifting gear
5. Pump/Lift as determined necessary
6. Place vessel on deck barge and secure for transport to staging area
7. Transport vessel to staging area
Debris
I. Determine best approach route to vessel (taking into consideration water depth, width of
channel, marine traffic)
2. Secure salvage equipment and hazardous containment equipment alongside target vessel
3. Secure perimeter of vessel with oil containment boon
4. Secure target vessel with rigging and lifting gear
5. Pump/Lift as determined necessary
6. Place vessel in hopper barge for disposal
The contractor shall factor the above approach into the quoted price along with all the necessary
items to complete Sunken Vessel removal. Marine based operations shall be priced per linear foot
of unit.
Land Based Water Salvage/Removal Operations
For Land Based Salvage/Removal Operations of Vessels the contractor shall have extensive
knowledge and experience in marine salvage and marine wreck removal. Contractor must show
experience with numerous salvage/wreck removal contracts and have the ability to quickly
mobilize specialized salvage equipment into position.
Contractor must be capable of providing the following at a minimum for the removal of Sunken
Vessels.
Refloat
1: Determine best approach route to vessel (taking into consideration roadways, power/phone
lines and traffic)
2. Secure salvage equipment and hazardous containment equipment alongside target vessel
3. Secure perimeter of vessel with oil containment boom
4. Secure target vessel with rigging and lifting gear
5. Pump/Lift as determined necessary
6. Once refloated inspect for any incoming water
Page 39 of 73
7. Secure vessel to predetermined mooring site
Stage
1. Determine best approach route to vessel (taking into roadways, power/ phone lines and traffic)
2. Secure salvage equipment and hazardous containment equipment alongside target vessel
3. Secure perimeter of vessel with oil containment boom
4. Secure target vessel with rigging and lifting gear
5. Pump/Lift as determined necessary
6. Place vessel on deck barge or lowboy hailer and secure for transport to staging area
7. Transport vessel to staging area
Debris
1. Determine best approach route to vessel (taking into consideration roadways, power/plione
lines and traffic)
2. Secure salvage equipment and hazardous containment equipment alongside target vessel
3. Secure perimeter of vessel with oil containment boom
4. Secure target vessel with rigging and lifting gear
5. Pump/Lift as determined necessary
6. Place vessel in hopper barge or dump trailer for disposal
The contractor shall include the above in the quoted price along with all the necessary items to
complete Vessel removal. Water and land based operations shall be priced per linear foot of unit.
R. Vehicle and Land -Based Vessel Removal
For the removal and recovery of vehicles the contractor shall include the following plan of action in
the quoted price for these services:
Contractor will prepare and equip sites for use upon initiation of contract work. Each site will be
equipped with perimeter lighting at 300-foot intervals, six-foot fencing, gates, and paving, as well
as portable office buildings, inspection towers and utilities. Each prepared aggregate site will have
a level, clean, dry, and firm surface and be navigable and accessible by recovery and remediation
vehicles and equipment. Each site will also be evaluated and prepared with regard to issues of
ingress and egress, highway access, neighborhood concerns and soil conditions. During
mobilization, Contractor will supply and transport all necessary supplies, equipment, materials, and
personnel to the aggregation sites, and build out the improvements to the site required for storage
and remediation operations. Contractor will obtain clearance from underground or overhead
utilities and hair property owners and state and parish entities for the aggregation locations.
Operation of the Aggregation Sites
These sites shall be fenced, lighted, and secure according to applicable state regulations. Contractor
must be prepared to operate the sites to receive vehicles up to twenty-four hours a day and up to
seven days a week as required by the County or State. Vehicles will be stored in a manner to
permit inspection by State authorities as required, or for reclamation by owners. Contractor shall
also be prepared to provide our own 24-hour security if security is not otherwise provided for.
The sites shall centrally located to the areas containing the greatest proportion of damaged and
abandoned vehicles, the total approximate potential acreage of the sites will be sufficient to
accommodate the projected number of vehicles to be stored over the life of the contract. A
significant proportion of the sites should only require little preparation to be used for this purpose;
they should be available within whatever period of time required for storage and remediation of
vehicles. Following appropriate preparation, the remainder of the acreage will be available shortly
thereafter.
Towing
Licensed towers shall be issued work orders from a central dispatch containing all pertinent data
supplied by authorities within 48 hours of receiving. Recovery vehicle shall, within 24 hours, arrive
at the site and immediately access the vehicle. Any environmental issues shall be mitigated, and
any and all safety issues addressed. Should the operator find any major threats to health, safety or
the environment, vehicle shall not be moved, and the County or State shall immediately be notified.
Once all concerns are addressed, the vehicle shall be lifted, properly secured and transported to the
assigned staging area using the safest and most direct route.
Page 40 of 73
Receipt of Vehicles
Each site will be equipped with a tower maimed by both an independent monitor and one of the
Contractors representatives in order to record the receipt of each vehicle and maintain accurate
records. As the vehicle is accepted at the tower, it will be checked into the aggregation site using
the vehicle Year, Make, Model, License Plate State and Number, Vehicle Identification Number,
extent and type of damage, and its location on the lot by row number, column letter, and GPS
location. Contractor shall also record any identifying information or number(s) contained in
markings or stickers affixed to the vehicle by authorities for purposes of the recovery operation. If
the vehicles have been tagged with a bar code, the tag will be scanned and printed. A computerized
tracking of the vehicle is then prepared and the condition of the vehicle and the processes that it
goes through, making ready, crushing, shredding, etc., are then tracked. This ticket also then
becomes part of the pay documents for the recovery, preparation, and disposal. If necessary or
required, Contractor will typically mark the windshield of the vehicle with an identifying number
for ease of future identification. Such numbers and tags then become unique and continuous
identifiers to monitor the vehicle through each step.
Storage of Light, Medium, and Heavy -Duty Vehicles
Vehicles introduced into the aggregation site will be stored at the site for sixty days or more in our
fenced, lighted, and secure environment. Vehicles will be staged, tagged, and marked for easy
retrieval and inspection. Vehicles will be stored in locations identifiable by row and column
number and letter and by GPS coordinates. Location identifiers will be keyed to the vehicle
records in the site's tracking database.
Vehicles will be stored in a manner to allow ample access for inspection by State or local
authorities and/or to allow for retrieval and reclamation by vehicle owner when applicable and the
contractor when the holding period has expired and the vehicle is being removed for final
dismantling, recycling, and/or disposal.
Demobilization
Vehicles will be discharged to appropriate entities for disposal, recycling, or other appropriation as
directed by the terms of the contract, after clearance through applicable protocols, and after
documentation in the vehicle record, described above.
Once all vehicles are removed, Contractor will remove all equipment, supplies, and non -hazardous
trash fion the aggregation site. We will dispose of all trash and debris in a permitted landfill and
repair and rennediate any damage to the aggregation site caused by the storage and rennediation
operations and equipment as directed by the Canty.
Vessels
Contractor must develop a Technical Approach for the Recovery and Storage of vessels that
provides a clear solution for this portion of the contract which meets the needs of the Owner and
satisfies all federal, state, and local licensing, and contractor regulations and requirements.
Mobilization
Contractor will prepare and equip stoage sites for use upon initiation of contract work. Each site
will be equipped with perimeter lighting at 300-foot intervals, six-foot fencing, two gates, and a
hard packed surface, as well as portable toilets, receiving areas, electrical, and telephone service,
and any necessary storage equipment. The prepared aggregate sites will have a level, clean, dry,
and firm surface and be navigable and accessible by recovery vehicles and equipment. The sites
will also be evaluated and prepared with regard to issues of ingress and egress, highway access,
neighborhood concerns, soil conditions, wetlands and other environmental issues. During
mobilization, Contractor will supply and transport all necessary supplies, equipment, materials, and
personnel to the aggregation sites, and build out the improvements to the site required for storage
operations. Contractor will obtain clearance front underground or overhead utilities and from
property owners and state and parish entities for the aggregation location. Contractor and/or its
subcontractors must have recovery equipment and vehicles prepared to mobilize upon the first
notification to recover vessels.
Operation of the Aggregation Sites
Page 41 of 73
These sites shall be fenced, lighted, and secured according to applicable state regulations, in
particular as required by the solicitation. Contractor shall prepared to operate each site to receive
vessels at minimum from 7:00 am until 5:00 pm, Monday through Saturday, and up to twenty-four
hours a day and up to seven days a week as required by the State, for access and inspection.
Vessels will be stored in a manner to permit inspection by State or County authorities or for
reclamation by owners.
Contractor sites shall be centrally located to the areas containing the greatest proportion of
damaged and abandoned vessels. The total approximate potential acreage of the site will be
sufficient to accommodate the projected number of vessels to be stored over the life of the contact
for that area. Our sites will be available within whatever period of time required for storage of
vessels.
Recovery Recreational Boats
Contractor and its subcontractors shall have recovery equipment and tow vehicles prepared to
mobilize upon the fast notification to recover vessels. Vessels that have been identified and cleared
for recovery and towing from public lands by the appropriate state or local agency will be
recovered within 72 hours of notification. Recovery will begin with identification of the vessel
using GPS coordinates supplied by notifying agency. Contractor shall inspect the vessel and make
a record of the vessel location, description, registration number, and the type and extent of damage.
Prior to towing, Contractor shall mitigate any Fluid leaks. Outboard motors shall be tilted to the
utmost position. Batteries shall be disconnected; leaks shall be mitigated. Vessels will then be
transported to the aggregation site safely and securely by Contractors towing vehicles, trailers, and
equipment.
Receipt of Vessels
Each site will be equipped with a receiving area manned by both an independent monitor and one
of our representatives in order to record the receipt of each vessel and maintain accurate records.
As the vessel is accepted at the receiving area, it will be checked into the aggregation site with a
record of the vessel recovery location, description, registration number, extent and type of damage,
and its location on the tot by row number, column letter, and GPS location. Contractor shall also
record any identifying information or number(s) contained in markings or stickers affixed to the
vessel by State or County authorities for purposes of the recovery operation. If the vessels have
been tagged with a bar code, the tag will be scanned and printed. A computerized tracking of the
vessel shall then be prepared and the condition of the vessel and the processes that it goes through
are then tracked. The receipt document then becomes part of the pay documentation. If necessary
or required, Contractor shall typically mark the topside, bow, stern and/or deck of the vessel with
an identifying number for ease of future identification. Such numbers and tags then become unique
and continuous identifiers to monitor the vessel through each step.
5. Storage of Trailers and Light, Medium, and Heavy Recreational Boats
Vessels introduced into the aggregation site will be stored at the site in a fenced, lighted, and
secure environment. Vessels will be staged, tagged, and marked for easy retrieval and
inspection. Vessels will be stored in locations identifiable by row, column number, letter,
and/or by GPS coordinates. Location identifiers will be keyed to the vessel records in the
site's tracking database. Boats will be segregated by type and size and trailers will be
segregated from boats. Vessels will be stored in a manner to allow ample access for inspection
by State or local authorities and/or to allow for retrieval and reclamation by vessel owner when
applicable and the contractor when the holding period has expired and the vessel is being
removed for final dismantling, recycling, and/or disposal.
S. Contractor, at the direction of owner, will secure, operate and maintain one or more fenced, lighted
and secured sites for the safe staging and storing of recovered vehicles and vessels. Site will be
manned 24 hours per day, 7 days per week.
T. Contractor will furnish all labor, equipment and materials necessary to perform the installation of
travel trailers at sites specified by owner.
Basic Trailer Installation
Trailers shall be towed from the staging area to the designated sites. The towing operator shall be
properly licensed and insured. All roots, rocks and debris at the base of the piers shall be cleared.
Page 42 of 73
The trailer shall be properly placed and aligned. Trailers shall be set up on concrete piers. The set
up will include a minimum of six piers, three on each side, evenly spaced. The contractor shall
provide a base for the piers. The base will be 3/I'X24"X24" exterior grade plywood. The piers will
have a minimum of two solid cap blocks on the base and two solid cap blocks on the tops of the
piers. After the weight of the travel trailer is transferred to the piers, the piers must be vertically
aligned and tightly shimmed with wooden wedges. The contractor shall be responsible for all
necessary re -leveling of the trailer for a period of 90 days.
Contractor shall install two anchors per side. All anchors must be placed, driven or augured in
place. The straps shall be 1.25"X.035" cold rolled galvanized steel. The anchor straps shall be snug
and in a near vertical position.
Sewer line installation from the sewer riser and connection to the travel trailer is to be provided by
use of 3" hard PVC. The line shall be of the shortest practical. At sites with a sewer riser already
installed, the contractor will make the connection between the travel hailer connecting point and
the riser, up to 50 feet. If a sewer riser is not in place, a clean out fitting will be installed in an
accessible location to facilitate snaking -out a clogged up line from the connecting point, through
the riser and into the main or sewer line. The pipefitting that attaches the sewer connection to the
drain outlet of the travel trailer shall be threaded and screwed or installed with a removable adaptor
for that drain outlet. The nominal inside diameter of the unit sewer connection shall not be less than
three inches (3"). The slope shall be continuous and at least one quarter inch (1/4") per foot and no
more than one half inch (1/2") per foot. Overhead hanging sewer straps shall be placed at four foot
(4') intervals (maximum) to prevent any deflections. The contractor shall test the sewer line for
leakage and any leaks shall be repaired at no additional cost.
If the sewer riser is not in place, the contractor will make our appropriate sewer tap on the sewer
collection line and install the necessary piping and riser connection. Serer piping shall be installed
in accordance with local codes and the Unified Plumbing Code. The contractor shall test the sewer
line for leakage, and any leaks shall be repaired at no additional cost. The above ground line shall
be properly sealed where it connects to the sewer riser. The above ground sewer line shall be
strapped and secured properly every four feet. This includes up to 50 linear feet of above ground,
three inch (3") sewer.
Water tine installation from the existing service connection to the travel trailer service pipe is to be
provided by use of approved RV water hose, up to fifty feet (50'). For sites with water service riser
already installed, the contractor will make the connection between the travel trailer connecting
point and the riser. A cut-off valve and a hose bib with anti -siphon valve shall be located adjacent
to the unit connecting point. The contractor shall test the service line for leakage and any leaks
shall be repaired at no additional cost.
Where local water pressure is in excess of the manufacturers recommended maximum psi, the
contractor shall install an approved water pressure reducing device to safeguard the unit's Plumbing
system. If the water service riser is not in place, the contractor will make an appropriate tap on the
water service line and install the necessary piping and riser connection. Water piping shall be
installed in accordance local codes and the Unified Plumbing Code. All service line beneath the
travel trailer shall be installed clear of the ground, made with minimum number of joints, be of
shortest practical length, and be supported by metal straps at four foot (4') intervals maximum.
The contractor shall test the service line for leakage and any leaks shall be repaired at no additional
cost. RV hose shall be capable of withstanding constant exposure to weather elements. A pressure
regulator valve is required on the supply inlet. This includes up to fifty feet (50') of portable water,
hose, anti siphon valve, and any required pressure reducing device.
The contractor shall provide connection of service from the electrical assembly to the travel trailer
weatherproof electrical disconnect pedestal box up to fifty feet (50'). The power supply cable shall
be furnished with the travel trailer, whenever possible the contractor shall provide above ground
electrical service from the applicants panel box to the RV disconnect. The weatherproof disconnect
box or RV receptacle box will be provided and installed by the contractor at a point near the travel
trailer to permit connection of existing power cord. The weatherproof disconnect box will be
equipped with the appropriate breaker to provide an approved 30 amp service and mounted on
treated 4X4 post or the equivalent. The bottom of the weatherproof disconnect box will be a
Page 43 of 73
minimum of ten inches (10") above ground level. Installation of electrical service will meet all
federal, state and local codes and requirements. This includes up to fifty feet (50') of above ground
direct wiring.
Note: Travel trailers that are electric models will require a 50 amp service and circuit breaker.
The requirements are as above, amended to 50 amp service and circuit breaker. The increased
cost of the 50 amp service and circuit breaker shall be offset by the lack of a LP gas
requirement for the unit.
Contractor shall fill both propane tanks where applicable.
The contractor shall install steps at each travel hailer entrance. All wooden steps shall be made of
exterior grade framing lumber. The contractor shall prepare the grade and construct a level step,
such that the step is centered on the door and safely beneath the doorsill in a manner that does not
represent a trip or safety hazard. The steps must not impede the opening or closing of the door or
restrict occupant entrance or exit. The steps will be constructed of wood thirty six inches (36")
wide. Handrails constructed with 2"X4" safety edge lumber shall be provided on all steps and
installed on both sides of the steps. The platform and steps shall have a stable and secure
foundation, be level in both directions and be anchored. All handrails shall be sanded and painted
with two coats of white paint.
As part of the basic install, the contractor shall make travel hailer ready for occupancy (RFO).
➢ Arrange all furniture for occupancy
➢ Clean and mount storm window panels
➢ Install drawers
➢ Remove window clips, travel blocking and protective taping
➢ Hang fire extinguisher
➢ Mount exterior light fixtures and install bulbs
➢ Install interior light globes and covers
➢ Install screens
➢ Reinstall any fallen curtains
➢ Install cabinet door panels and any other knockout panels
➢ Install commode tank lid
➢ Repair, if necessary, cabinet/door/drawer hardware
➢ Test water system and make minor repairs(i.e., tighten, adjust or replace fittings, flare
nuts, faucet washers, ball cocks, shower diverters, faucet sets, etc)
➢ Verify hot/ cold water lines. Reverse if necessary
➢ Tighten or replace loose drain line connections
➢ Replace commode wax ring and tank gaskets as needed
➢ Tighten loose connections in electrical system
➢ Test electrical circuits and replace bulbs, breakers, switches or receptacles as needed
➢ Activate, test and make any necessary minor repairs to the refrigerator, range, furnace, air
conditioner, and water heater for proper operations. Adjust pilots and boners, change
orifices, water heater elements, etc., as needed
➢ Test smoke detector and replace if faulty.
➢ Test exhaust fans for proper operation and repair as needed
➢ Clean floors, counters, kitchen fixtures, bath fixtures and windows
➢ Perform any other minor work required to prepare the unit for occupancy
➢ Remove unit packing debris and excess set up material from the premises
Additional services to be supplied as needed
Sewer Line, Buried
The conhacto• shall run necessary sewer line and sewer riser from the sewer tap to the travel
hailer. At sites with sewer riser already installed, the contractor will make the connection
between the travel trailer connecting point and the riser. If a sewer riser is not in place, the
contractor will make an appropriate sewer tap on the sewer collection line and install the
necessary piping and riser connection. A clean out fitting. will be installed in an accessible
location to facilitate snaking -out a clogged up line from the connecting point, through the riser
and into the main service or line. The pipefitthng that attaches the sewer connection to the drain
outlet of the travel trailer shall be threaded and screwed or installed with a removable adaptor
for the drain outlet. The line shall be the shortest practical length and shall include a clean out.
Page 44 of 73
The contractor shall test the sewer line for leakage and any leaks shall be repaired at no
additional cost. All sewer piping and installation shall be installed in accordance and
compliance with state and local codes and Unified Plumbing Code. This also includes
placement in a trench separate from the water line and at a distance from the water line, burial
below the surface of ground, and securing the installation to reduce deflections. Backfill
materials will be free of rocks and other debris and will include a bed of compacted sand six
inches (6") above and six inches (6") below the sewer line. If the travel trailer has multiple
sewer drop points, they will be interconnected to a single unit drop point.
Install Sewer Tap
If a municipal sewer tap is required, the contractor shall excavate, install the tap, and connect
to the sewer line from the travel trailer and backfill, according to local requirements. The
sewer tap shall be made in accordance with local regulations regarding sewer tap installations.
All piping shall be connected to assure free flow. In the event the governing entity has a
predetermined fee for sewer taps, such fee shall be paid by the contractor and reimbursed at
actual expense.
Water Line, Buried
The contractor shall extend water service from the supply source to the travel trailer pad. If the
water service riser is not in place, the contractor will make an appropriate tap on the water
service line and install the necessary piping and riser connection. Service line is to be laid a
minimum of six inches (6") below the frost line and not less than twenty four inches (24")
below the surface of the ground with a three quarter inch (3/4") shut off valve installed in the
water line, or three quarter inch (3/4") shut off valve with pet cock must be installed in the
water line. The service line must be placed in a trench separate fiom the sewer line and at a
distance that is in compliance with state and local codes. A cut off valve and a hose bib with
anti -siphon valve shall be located adjacent to the unit connecting point. The contractor shall
test the line for leakage and any leaks shall be repaired at no additional cost. A backflow
preventer valve will be properly installed. Backfill materials shall be free of rocks and debris
and shall include a bed of compacted sand six inches (6") above and below the water line.
Where local water pressure is in excess of the manufacturers recommended maximum psi, the
contractor shall install an approved water pressure reducing device to safeguard the unit's
plumbing system... All service lines beneath the travel trailer shall be installed clear of the
ground, made with the minimum number of joints, be of the shortest practical length, and be
supported by metal straps at four foot (4') intervals maximum.
Municipal Water Tap
If a municipal water tap is required, the contractor shall excavate, install the tap, and connect
to the water line from the travel trailer and backfill, according to local requirements. The
installation of the water tap will be accomplished in conjunction with, and according to the
regulations of the local water company. In the event the governing entity has a predetermined
fee for water taps, such fee shall be paid by the contractor and reimbursed at actual expense.
Power Pole w/ Meter
Furnish and install 50 amp travel trailer electric power pole and meter loop - The contractor
shall install an overhead electric assembly. This assembly shall be at least 50 amps (120/240
volt service) with a weatherproof, rain -tight meter box containing a 50 amp circuit breaker. All
components shall be installed in accordance with the National Electric Code (NEC) and local
codes. All conduit connections on the meter pole must be watertight. Pole shall meet all code
requirements.
Water Line Winterization
When specified, the contractor shall install freeze protection heating tapes and insulation to
water supply piping and shut off valves to prevent freeze up of the system.
Handicap Ramp
The contractor shall prepare the grade and construct a wooden ramp with level platform such
that the platform is centered on the door of principal entry into the travel trailer and flush with
the doorsill. Contractor shall coordinate ramp design with local authorities to ensure
compliance with the current American disabilities Act, and state and local requirements. All
wood shall be treated, exterior grade framing lumber and shall be used throughout, except for
Page 45 of 73
the platform and runway surface, which shall be exterior plywood. The handrail shall be 2"X4"
safety edge lumber, sanded and painted with two coats of white paint. Nails shall be coated and
sized consistent with industry standards.
The overall length of the ramp and platform shall be fixed by the height above the grade of the
travel trailer sill the distance to either a point abreast of the unit, or to a suitable, firm surface
approach to the ramp. The ramp pitch shall be one inch (1") slope for each twelve inches (12")
in length maximum. The ramp shall be firmly supported on grade, with mud seals added where
necessary because of soil conditions. The ramp and the platform shall have a non-skid surface.
Direct Wiring to Well Pump Switch
The Contractor shall provide and install a 30 AMP well pump switch. All components shall be
installed in accordance with the National Electric Code (NEC) and local codes. All conduit
connections must be watertight and meet all code requirements.
Aboveground Electrical Access
The Contractor shall provide and install all aboveground electrical connection in excess of the
basic set-up. All components shall be installed in accordance with the National Electric Code
(NEC) and all local codes.
Obtain State and Local Permits
The Contractor shall be responsible for obtaining necessary permits associated with placing
and installing the unit and utility installation. Permits shall be applied for within 3 working
days of work order issuance. FEMA will reimburse the contractor the actual permit fees.
Receipt required.
Direct Burial of 50 AMP Service
At sites with electrical service drop (meter box or other connection point) already installed, the
Contractor shall provide underground service (in compliance with all codes and regulations)
from the electrical assembly to the unit. All cable shall be appropriately buried and shall be
installed in accordance with the National Electric Code (NEC) and local codes. All conduit
connections must be watertight and meet all code requirements. The conduit shall be securely
attached to the electrical boxes in accordance with accepted methods and standards. Sweeps
shall be used at the unit and meter loop assembly. If an electrical service drop is not in place,
the Contractor shall install an electrical assembly for utility company connection.
Handicap Platform Steps
The Contractor shall prepare the grade and construct a wooden series of level platforms such
that the level platform is centered on the door of principal entry into the travel trailer and flush
with the doorsill. Contractor shall coordinate platform design with local authorities to ensure
compliance with the current American Disability Act, and State, and local requirements.
All wood shall be treated, exterior grade framing lumber and shall be used throughout, except
for the platform surfaces, which shall be exterior plywood. The handrail shall be 2" x4"
safety -edge lumber, sanded and painted with one coat of white paint. Nails shall be coated and
sized consistent with industry standards.
The overall number of platforms shall be fixed by the height above the grade of the travel
trailer sill and the distance to either a point abreast of the unit, or to a suitable, firm surface,
approach to the ramp. The platform heights shall be between seven and one half -inch (7 %")
and eight inches (8") maximum. The platforms shall be firmly supported on grade, with mud
seals added where necessary because of soil conditions. The platforms shall have a non-skid
surface materials that are FEMA/Industrial approved (sand added to paint is unacceptable).
U. Marine Debris Removal
The contractor shall provide all management, tools, supplies, equipment, labor, and applicable licenses
and permits necessary to conduct marine debris removal and disposal services.
Marine Debris identified in the schedule of the contract shall be removed, handled, transported, and
disposed of in accordance with OSHA, and all applicable Federal, State, and local laws, codes,
Page 46 of 73
regulations and procedures. The removal of any waste not listed in the Schedule shall only be removed
after receipt of written approval from the Contracting Officer.
The work shall consist of removing all wet debris from water surface to sediment bottom from within the
waters and lands of the State/County/City, transferring the debris to land based trucks and hauling to
approved landfills. Contractor shall price according to land based and marine based line items by the
cubic yard to include all necessary consideration to complete this work in its entirety.
V. Supplemental Water and Food Sources
Water Sources
In an emergency or disaster situation water is an extremely valuable resource that must be properly
managed to ensure that it is distributed fairly. Contractor will provide drinking water, ice, and
water for sanitation purposes in accordance with federal, state, and local laws concerning
emergency water rationing and water shortages. Contractor shall be able to provide water
resources to ensure smooth operations for emergency management personnel and to emergency
shelters and the general public. Contractor shall have an extensive history in providing emergency
water supplies to locations throughout the United States and remote locations overseas.
Contractor is required to provide water in mass quantities to be utilized and distributed to
emergency personnel and the general public in accordance with priority placement by emergency
command officials. Contractor shall provide water suitable for drinking, cooking, and
cleaning/sanitation purposes. Contractor shall provide all forms of water to include, but not limited
to: Pre -packaged purified bottled water, distilled water, Ice, water suitable for sanitation purposes,
large water storage containers, water tanker trucks, and processed water.
To ensure quick, efficient and proper water distribution Contractor shall developed an emergency
water management program to assess the impact of the water shortage to local communities and
priority need of certain groups and agencies. On the basis of this analysis, they work closely with
emergency officials to determine the most critical need areas and proper water quantities.
Food Sources
Contractor shall be prepared to provide tens of thousands of hot, individually prepared meals in
most extreme and demanding environments. Contractor should be able to provide substantial
technical assistance and/or consultants to assist and advise on temporary food services, supply and
provisions.
Contractor shall be prepared to provide Heater Meals or equivalent to the government entity in
extremely large quantities. This firm must extensive experience with expedited shipments.
Contractor must be able ship on the same day as an order is placed, and work with major trucking
firms using "team drivers" to provide expedited delivery throughout the Continental United States.
They must be able deliver & drop 53" filled trailers for extended use at designated sites, if helpful.
Contractor must have the experience and capabilities to set up dining facilities, food distribution
stations and/or to provide cold or hot pre -packaged meals, as required; immediately, and under
virtually any disaster circumstance. Contractor may be asked to provide alternative food services
to government entity.
W. DEMOLITION
1. This scope of work applies to decommission, demolition, and debris removal from privately -
owned structures. The Contractor shall provide all equipment, operators, and laborers for work as
specified in individual Task Order(s). The work shall consist of private property debris removal,
and hazardous substance decommissioning of structures in accordance with applicable federal,
state, and local requirements.
The scope of demolition addresses privately -owned structures and removing demolition/general
disaster generated debris and includes, but is not limited to: decommissioning structures for
hazardous substance removal, demolition of single/multi-family homes, detached garages, framed
out -buildings, storage/tool sheds, fences, and collection of other onsite disaster generated debris
Page 47 of 73
such as but not limited to wood, construction/demolition (C&D), soil & mud, and stumps. Woody
debris will be kept segregated from C&D debris as much as possible. Woody debris includes
vegetative debris and clean woody C&D debris, (i.e. not pressure -treated wood or wood with
significant painted surfaces). The contractor shall repair all roadways, sidewalks, utilities, drainage
structures and other features not designated for demolition or removal, which are damaged by
Contractor operations. This will include re -sloping to original grade.
The contractor shall work during daylight hours only, for a maximum of 12 hours per day, 7 days
per week or as directed by the Contracting Officer in coordination with local officials.
Concrete slabs, sidewalks, structural foundation piers attached to the ground shall not be
demolished or damaged unless otherwise directed by the Contracting Officer. Standing trees shall
only be removed as debris when directed by the Contracting Officer. If a slab presents a threat to
public health and safety and the Contracting Officer directs the Contractor to remove it, the slab
shall be removed by lifting it off the lot rather than by removing it by excavation. Using low
impact procedures slab can be broken into easily removable pieces of concrete that will facilitate its
removal from the site. Voids found under the slab shall be filled with sand to an elevation 2-6
hrclres above the surrounding ground elevation.
All dumping operations shall be directed by the debris reduction site or dumpsite operator. The
Contractor shall cooperate with the dumpsite operator to facilitate effective dumping operations.
The concept of operations is a three -step process as outlined below, which consists of private
property debris removal, decommissioning of the structure, and demolition/removal of the
structure. The Owner will provide the contractor with a list of structures to be demolished
(Attachment 2), and approved disposal sites (Attachment 3). The Owner provided list will identify
whether houses are to be handled and disposed of as C&D or Regulated Asbestos Containing
Material (RACM).
The Contractor shall remove all eligible debris from around the structure and haul this material to
the appropriate disposal site.
The Contractor shall assess and remove all hazardous substances in the structure and haul to the
appropriate disposal site.
The Contractor shall demolish the structure and haul the resulting waste streams to the
appropriately permitted landfill disposal sites, in accordance with the attached LDEQ guidance.
The Contractor shall provide all labor and equipment necessary to complete this work identified in
awarded task orders. No explosives will be permitted.
Prior to demolition of each structure, the Contractor shall complete the pre -demolition checklist. A
photograph and GPS coordinates of each structure to be demolished shall be included on the
checklist. An Owner shall approve each checklist prim' to the Contractor beginning demolition.
General Debris generated by the storm such as but not limited to: vegetative debris, soils & mud,
leaners and hangers, scattered C&D, and stumps that are located on the property, adjacent to the
structure to be demolished, shall be removed and appropriately disposed of.
Structures that are determined to be structurally sound by the Contractor shall be decommissioned
prior to removal. The decommissioning of a structure shall consist of a hazardous substance
assessment and the subsequent removal of any such items found. Anticipated hazardous substance
waste streams include, but may not be limited to: household hazardous waste, white goods,
electronic waste, special waste, and universal waste. While assessment, documentation, and
removal of all waste streams during the demolition process is required, ACM handling and
removal, and reporting in conformance LDEQ ACM Guidance for Hurricane Demolition Debris is
essential for compliance and managing risk associated with this work. The contractor shall
complete removal of hazardous substance waste streams in no more than one work day after entry
of the structure, unless the contracting officer provides written authorization for increased work
durations.
Page 48 of 73
Unsound structures shall not be entered prior to structure removal for decommissioning
assessments and removals. During the removal of unsound structures, hazardous substance waste
streams and white goods shall be collected from the structure and handled as per the requirements
of paragraph 6.2, using the following sequence:
1. Wet the structure and partially remove, so remaining structure and/or debris is stable enough to
allow access by decommissioning crew.
2. Survey the structure and segregate waste.
3. Segregate and remove HHW and white goods. Removal of segregated waste shall be made in
accordance with LDEQ disposal requirements.
4. Complete structure removal of the building as a C&D or RACM waste stream.
The work includes providing all equipment, materials, and labor for disconnecting all utilities,
capping water lines, and plugging sewer taps or pipes to septic tanks or sewer systems in
accordance with local requirements. Disconnection of all utilities shall be coordinated by the
Contractor with the appropriate local service providers. For locating and marking the locations or
underground utilities, the Contractor shall coordinate with the appropriate local service providers
and/or contact Louisiana One Call at (800) 272-3020. It should be noted, however, that Louisiana
One Call can only coordinate with the utility local service providers throughout the State that have
signed on with their service. The Contractor shall contact the local utility companies prior to
commencing work to coordinate termination of gas, water, electric, phone, cable TV, and any other
utility services to the nearest acceptable point. In cases where there are no shut-off valves, and
excavation is required within the utility rights -of -way, the excavation shall be limited to the
existing Right of Way (ROW) to the greatest extend feasible, in order to limit unnecessary ground
disturbance. Sewer taps shall be plugged with screw type expanding plug inserts or other means
approved by the local sewer authority, to prevent intrusion of ground water into the existing sewer
system. Septic tanks encountered shall be left in place. The contractor shall take reasonable care
and ensure that damage does not occur to any septic tanks or undamaged water wells, grinder
pumps and associated tanks/piping. The Contractor shall be responsible for the repair of utilities
damaged as the result of his negligence. The contractor will not be liable for any preexisting
damage to utilities.
Personal property items, such as but not limited to: automobiles, boats, trailers, and recreational
vehicles, shall be relocated offsite to the nearby ROW such that they will not interfere or hinder the
Contractor's demolition operations. The Contractor shall take reasonable care not to damage
personal property items while moving them, and shall not be responsible for damages to personal
property items being moved, unless such damages are determined to be the result to negligence
through his actions. The Contractor is not responsible for storm related or other pre-existing
damage to personal property.
Demolition shall not begin on structures without an Owner or designated representative present.
The Contractor shall check the structures immediately prior to demolition to insure that the
properties are vacated.
During demolition, decommissioning of structurally unsound structures, and the removal and
hauling of associated debris, water shall be used to control dust. A water truck will be required at
each demolition site. The amount of dust resulting from demolition shall be controlled to prevent
the spread of dust to occupied areas near the demolition site and to avoid creation of a nuisance in
the surrounding area. Use of water shall not be allowed to result in, or create, hazardous or
objectionable conditions such as ice, flooding and pollution.
The Contractor is responsible for ensuring traffic safety in all work areas. Flag persons, temporary
signage, or other approved means shall be provided by the Contractor as needed to comply with the
above requirement. Prior to the start of demolition of each structure, the Contractor shall cordon -
off the work zone, and ensure that it is effectively delineated to prevent access by unauthorized
personnel.
The Contractor shall submit a Contractor Safety Plan. The plan shall address decommission tasks,
hazards, and mitigation measures for review and approval prior to implementation of any
decommissioning. The Contractor's safety plan shall address procedures to be used when
conditions, such as a high risk of collateral damage to adjacent facilities, excessive danger to work
Page 49 of 73
crews, structural instability, etc. will preclude the use of normal demolition procedures or require
additional measures to be taken.
The Contractor shall develop a Decommissioning Plan for the decommissioning of structures to be
demolished, and shall be in accordance with all federal, state, and local regulations. The
Decommissioning Plan's components shall address, but not be limited to the following items:
decommission inspections; inspector qualifications and training; evaluation of structures for the
presence of hazardous substances and materials; hazardous material removal; and transport and
disposal of decommissioned waste.
A daily tailgate safety meeting shall be conducted each morning prior to each day's activities. The
daily safety meeting shall include the hazards expected with each day's activities and the mitigation
measures for each hazard shall be discussed. The Contractor Safety Plan may be referenced for
mitigation measures.
The Contractor shall submit a daily operation report. A separate operational report is required for
each task order/property. For example, if the Contractor is working three crews on the same day,
three reports shall be submitted at the end of that day (one for each crew). This form must be
signed daily by the OAR representative and the Contractor for payment to be made. Discrepancies
between the daily operational report and corresponding load tickets shall be reconciled no later than
the following day. In addition to that shown on the daily operational report, the Contractor shall
include a narrative on any significant activities occurring each day including but not limited to
verbal instructions, changes, clarifications, safety mishaps, near misses, or successes. The
contractor shall include in the daily operational report the structures demolished that day, including
building ID and address. Before and after photographs of all structures demolished shall be
submitted for the respective Pre -demolition or Post -demolition checklist.
The Contractor shall provide a work schedule including a time line for each task order/property.
The work schedule shall include number of hours per day and days of week the Contractor
anticipates working.
The contractor shall provide the following submittals for contracting officer within 5 days after
contact award:
Contractor Safety Plan
Contractor Decommissioning Plan
Contractor Quality Control Plan
Note: No site work will be allowed until these plans have been approved by the Government.
The contractor shall provide the following submittals as needed:
Task Order timeline and Schedule of Work per Task Order
Copies of all required permits and licenses
Pre -demolition photographs
Daily Operation Reports
Post -demolition photographs
While the contractor shall implement engineering controls (e.g. wetting) to maintain no visible
emissions criteria (luring demolition, the contractor shall also manage surface water runoff for
compliance with applicable federal, state and local requirements. For the purpose of this contract,
environmental protection is defined as the retention of the environment in its natural state to the
greatest extent possible dining execution of this contract. Environmental protection requires
consideration of air, water, and land and involves noise and solid waste management, as well as
other pollutants. The Contractor and its subcontractors shall incorporate appropriate measures to
manage environmental pollution arising from the demolition activities in performance of this
contract. Structures to be demolished will be adequately wetted down immediately prior to and
during demolition, and also (luring the loading of haul trucks prior to hauling the debris to
approved landfills. While trucks hauling RACM shall be lined, all trucks will have their loads
covered with tarps during transport.
The contractor will address potential asbestos containing materials using Best Management
Practices to the maximum extent practical, for the purpose of: (1) conformance with NESHAP and
Page 50 of 73
(2) removal of appropriate ACM, and (3) classifying the waste stream resulting from demolition as
C&D or RACM.
The contractor shall not remove or disturb any human remains. If human remains are encountered
at a site during demolition activities, all work at that site shall be stopped. The contractor shall
immediately notify:
1. The Contracting Officer or designated representative
2. Local law enforcement
3. Local government officials
If the contractor encounters animal remains, the remains shall be secured onsite and work may
continue. The contractor shall immediately notify:
1. The Contracting Officer or designated representative
2. Local government officials
If the contractor encounters ammunition, weapons, or explosives on site or during
demolition/cleanup activities, all work shall be stopped in the adjacent area. Work may continue in
other area on site. The contractor shall immediately notify:
1. The Contracting Officer or designated representative
2. Local law enforcement
3. Local government officials
If the contractor encounters valuables, such items shall be secured onsite and work may continue.
Valuables may include jewelry, cash, safes, and other items of monetary or sentimental value.
Under no circumstance shall contractor employees keep any found items for souvenirs or other
uses. The contractor shall immediately notify:
1. The Contracting Officer or designated representative
2. Local government officials
Household Hazardous Waste (HHW) is excluded from the definition of Hazardous Waste and
therefore does not require the same collection or handling procedures as Hazardous Waste.
Examples of HHW include, but are not limited to: batteries, waste oil, waste fuels, paint,
chemicals, antifreeze, pesticides, spray cans, unidentified liquids, and household cleaners.
Hazardous and Toxic Wastes (HTW) assessments of structures to be demolished will have been
accomplished by others as part of the ROE process. If suspected HTW materials are found by the
Contractor, (i.e. — 55-gallon drums containing unknown materials), they shall be immediately
identified and reported to the Contracting Officer's representative, so a determination as to the
disposition of the material can be made. Contractor personnel who will be handling HTW
materials shall be appropriately trained.
Petroleum Products — All storage tanks containing gasoline, diesel, propane or other petrochemical
products shall be pumped or drained prior to the tank being move, in coordination with appropriate
Federal, State, and Local agencies. Portable storage containers (oil cans, gas cans, etc.) containing
these products shall be segregated and disposed of in an appropriate manner. Contractor personnel
who will be handling petroleum product materials shall be appropriately trained.
E-Waste products shall be segregated on site and disposed of in an appropriate manner. Examples
of E-Waste include, but are not limited to: computers, televisions, radios, VCR's, stereos, copiers,
fax machines, and other common electronic products.
Ozone Depleting Substances — if in the process of demolition, items containing ozone depleting
substances are identified (white goods containing Freon), the Contractor shall handle them in such
a manner to minimize opportunities to allow the ozone depleting substances to escape.
White Goods — All white goods shall be removed from the structure during demolition, and shall be
segregated and disposed of in an appropriate manner.
Eligible debris under this contract consists of Demolition Debris generated from the demolition of
structures, and also General Debris such as but not limited to woody debris, soils & mud, and
stumps that were generated by the storm and is located on the property, adjacent to the structure to
Page 51 of 73
be demolished. Prior to debris removal, the Owner shall determine which debris on the property
constitutes eligible Debris.
Eligible debris and other waste shall be taken off site throughout the demolition process. The
Contractor shall not allow debris to accumulate during demolition.
Debris and rubbish including, but not limited to, trash, metal, plastic, and glass, shall be removed
fi-om within the footprint of the structure to be demolished. Debris shall be removed and
transported in a manner that prevents spillage on sheets or adjacent areas. State and local
regulations regarding hauling and disposal shall apply.
Load tickets shall be fulled out for tracking purposes of the removal of demolition debris and
tipping fees, and shall include the volume in cubic yards for each load being hauled to the
landfill/reduction site. Load tickets shall document cubic yard volume measurements for eligible
debris, and shall be provided by the Contractor. The load tickets will be sequentially numbered and
shall have five (5) parts.
Each load ticket shall contain the following information:
• Ticket Number
• Contract Number including Task order number
• Rights -Of -Entry (ROE) Number
• Date
• Contractor Name
• Sub -Contractor Name & crew ID
e Truck or Roll -off Number
• Point of debris Collection (Address)
• Truck Capacity
• Loading Departure Time/Inspector
• Disposal Site Arrival Time/Inspector
• Actual Debris Volume
• Truck Driver
• Structure condition & classification
• Debris classification (Demolition or General)
• Distance to Drop Off Point
• Disposal Site
The entire five -part load ticket is given to the vehicle operator by a government OAR prior to
leaving the loading area. Upon arrival at the disposal site, the vehicle operator shall give the entire
five -part load ticket to the OAR. The OAR will verify the harder and equipment and determine
each truck's actual volume of debris that is being hauled, after deducting void spaces, if any. The
actual volume of debris will be recorded on the load tickets by the QAR to the nearest cubic yard,
and the vehicle operator will be provided with one of the copies. The Contractor will be given two
(2) copies of the Load ticket, and the original ticket shall be kept by the Contracting Officer or the
designated representative. The load tickets shall be submitted with the daily report.
The Contractor shall designate a Contractor Representative (CR) at each project to supervise work
in progress. The COR will deal directly with the CR, for normal clay -to -day administration of the
contract provisions, within the limits of their authorities. The CR shall conduct overall
management coordination and is the central point of contact with the Contracting Officer for
performance of all work under the contract. The CR shall have full authority to contractually
commit the contractor for prompt action on all matters pertaining to administration of this contract,
and shall be the on -site Contractor employee who is responsible for safety. The CR shall also be
responsible for implementing the contractor Safety Plan and Daily Safety_Plan, have the authority
to determine for the Contractor when work is ready for government inspection and make decisions
for the Contractor on additional performance of work, when necessary.
The Contractor shall take necessary precautions to ensure that street signs are not moved or
damaged. The contractor may move signs temporarily for protection if they are in danger of being
Page 52 of 73
damaged during demolition. The Contractor shall return signs to pre-existing location and
condition following completion of demolition.
The Contractor will comply with the safety requirements contained in Safety and Health
Requirements Manual, OSHA, EPA, and other state and federal laws that address a safe work
environment. This includes the monitoring and safety of all employees who will be performing any
work under this Contract and each of the Individual Task Orders.
Compliance with the provisions of this contract by subcontractors will be the responsibility of the
Contractor.
The Contractor shall obtain all permits necessary to complete the work. The Contractor shall be
responsible for determining what permits are necessary to perform under the contract. Copies of all
permits shall be submitted to the Owner prior to commencement of work under any Task Order.
The Contactor shall be responsible for correcting any notices of violations issued as a result of the
Contractor's or any subcontractor's actions or operations during the performance of the contract.
Corrections for any such violations shall be at no additional cost to the Government. The
Contractor shall be responsible for control of pedestrian and vehicular traffic in the work area.
The Contractor shall secure the demolition area to provide a safe work site. The Contractors shall
exercise due care to minimize any damage to trees, shrubs, landscaping and general property. The
Contractor shall repair any damage caused by the contractor's equipment in a timely manner. The
Contractor shall take digital photographs of any damages caused by his operations and provide
digital copies to the Owner. Any damage to private property shall be repaired at the Contractor's
expense. The debris work area shall be left clean and clear of debris as reasonably and practical
corder the conditions of this contract.
In compliance with FEMA low -impact removal guidance, major demolition activities including
placement of equipment and debris removal containers shall be confined to areas where soils have
been disturbed by previous construction activities such as site development, construction, surface
grading, landscaping, utility trenching, etc. This shall include the use of tracked and/or large -tired
equipment to the maximum extent possible in order to minimize the depth of soil disturbance and
compaction to a depth of 8 inches or less. The use of heavy equipment shall be prohibited if
excessive sinking or rutting (greater than 8 inches) should occur following rainfall events where the
ground becomes saturated. Operations involving the use of heavy equipment shall resume after
conditions have improved such that excessive sinking or rutting is not longer a problem.
If the Contractor cannot follow the low impact demolition removal guidance for a specific structure
to be demolished, he will not continence demolition, and shall immediately inform the Owner.
The Contractor shall use equipment and perform work in a manner to prevent damages to adjacent
infrastructure facilities and adjacent rights -of -way, including all landscaped areas. The contractor
shall repair any damage caused by the Contractor's equipment in a timely manner at no expense to
the government. The contractor shall take digital photographs of any damages caused by his
operations and provide digital copies to the Owner. All equipment shall be approved by the OAR
prior to use. All loading equipment shall have street tracks and wheels to operate on the street/road
using buckets and/or boom and grapple devices to remove the load debris. Any damage to private
property, sidewalks, curbs, utilities, or streets shall be repaired at the expense of the Contractor.
Before beginning any demolition work, the Contractor shall visually survey the site to identify any
problem areas. The Contractor shall take necessary precautions to avoid damage to adjacent
properties. The contractor shall protect all fire hydrants and all utilities during work operations.
Any damaged items shall be repaired or replaced as approved by the Contracting Officer, as a ❑on -
reimbursable expense. The Contractor shall coordinate the work of this section with all other work.
The Contractor shall plan the work to minimize the impact on the neighborhood. The Contractor
shall conduct the work so as not to interfere with the disaster response and recovery activities of
federal, state, and local governments or agencies, or of any public utilities.
The government reserves the right to inspect the site, verify quantities and review operations at any
time.
Page 53 of 73
Trees outside the project site which might be damaged during demolition shall be left in place, and
shall be protected. Any such tree(s) damaged during the work under this Contract or Task Orders
shall be replaced.
Post -Demolition Cleanup — The Contractor shall remove all signs of temporary construction
facilities, work areas, structures, or temporary structures, stockpiles of excess waste materials, or
any other vestiges of demolition. The area shall be restored to near pre-existing conditions, with the
exception of those structures demolished as part of this contract. Restoration to original contours
will generally not be required, unless specifically directed by the Owner or the designated
representative. However, all restored areas shall be smoothly and evenly dressed.
Upon termination or completion of this Contract or Task Order(s) the Contractor shall vacate and
remove, or cause to be vacated or removed, all property belonging to Contractor, any
subcontractor, agent or employee.
Any property not removed shall be deemed abandoned by the Owner and any cost incurred by the
government in disposal of same shall be withheld from my final payment due.
2. Structure demolition with RACM construction and demolition debris loaded at the designated
work zone and hauled to an approved Type 1/11 landfill. Contractor shall disconnect and cap the
sewer and water line and coordinate all required disconnects by private utility companies. Search
safely accessible structures, including garages and detached outbuildings, and remove all white
goods, e-waste and household hazardous waste for ROW collection. Does not include removal of
concrete slabs.
X. Concrete Removal
1. At the direction of the Owner, Contractor shall load, haul, and dump broken concrete at an
approved landfill.
2. At the direction of the Owner, Contractor shall demolish concrete slabs, beams and columns and
haul to an approved disposal site.
Y. Creosote Timber Piling Removal
Contractor shall load, haul and dispose at an Owner approved Type 1/II landfill all eligible creosote
timber piling and miscellaneous creosote timber.
Z. E-Waste
E-Waste products shall be disposed of in an appropriate manner. Examples of E-Waste include, but
are not limited to: computers, televisions, radios, VCR's, stereos, copiers, fax machines and other
common electronic products.
AA. Household Hazardous Waste Collection and Disposal
Residents are directed to sat the debris by material type and place it at the curb in separate piles.
Trucks designated for a particular debris type shall collect the assigned debris and deliver it to a
temporary staging area, or debris management site, reduction, recycling, or directly to an
authorized disposal facility. Source segregated debris collection offers the potential of high
salvage value and efficient recycling/reduction processing. This method will be primary when
collecting hazardous and household hazardous waste and white goods. Ultimate disposal cost
should be included in the per pound price. Final disposal sites require approval from the
jurisdiction.
BB. Tire Removal
Contractor shall load, haul and dispose or recycle all eligible tires.
CC. River and Canal Shoreline Restoration
Contractor shall perform river and canal shoreline restoration to include any necessary excavation,
compaction, fill, and backfill ofembankment soils and materials to restore banks to preexisting
conditions insofar as possible.
Page 54 of 73
1. Excavation — Contractor will perform any necessary excavations of shoreline to facilitate
restoration including removal of storm -strewn minor obstructions and storm -related
aggregations of soils, gravels, and other shoreline material to restore shoreline elevations.
Prevent surface water from flowing into or accumulating in excavations. Stockpile excavated
soils to use for fill or backfill.
2. Compaction — Compaction shall be accomplished by moistening, rolling, or tamping to obtain
stable shoreline density.
3. Backfill and Fill — Place soil material in layers to required elevations and shoreline slopes.
Bank slopes to match existing insofar as possible.
1. In excavations, use satisfactory excavated or borrow material.
2. Under grassed areas, use satisfactory excavated or borrow material.
3. Under walks and pavements, use sub base material and utilize shoulders to
prevent lateral movement.
4. Under steps use sub base material.
5. Under building slabs, use drainage fill material.
6. Under piping or conduit, use sub base material and shape to fit bottom 90
degrees of cylinder.
Remove vegetation, debris, and deleterious materials from ground surface prior to placement
of fills. Plow, strip, or break-up sloped surfaces steeper that 1 vertical to 4 horizontal so that
fill material will bond with existing surface.
Before compaction, moisten or aerate each layer as necessary to provide optimum moisture
content. Place fill and backfill only on surfaces of appropriate moisture content. Place backfill
and fill materials evenly adjacent to structures. Grade areas disturbed by Contractor's
operations. Remove excess, excavated, and waste materials, including trash and debris, and
legally dispose of it at approved debris site.
DD. Power and light sources
Contractor must be prepared to provide light and power sources to the government entity
within 24 hours of request. Contractor must be able to supply these items to multiple locations
simultaneously without interruption.
EE. Stadium -Style Light Tower
Contractor shall provide necessary lighting towers as per pricing schedule.
FF. National Incident Management System (NIMS) Training
Contractor shall provide NIMS training for all employees as needed by a FEMA-certified
instructor. Upon completion of paining, documentation shall be supplied as proof of
completion.
GG. Assistance in Development of a Debris Management Plan
Contractor shall assist Owner in the development of a debris management plan to include but
not limited to the establishment of a command and communication center, the hierarchy of
routes to be opened, the identification of DMS locations, and landfills for final disposal.
HH. Additimial Services and Materials
Contractor shall provide Owner with any additional services and materials on an as needed
basis as directed by Owner.
H. Emergency Road Clearance
The following services shall be provided by the Contractor
• Provide Equipment, Labor and Materials necessary to open traffic lanes as designated
by the Parish, to include pushing of debris off the roadway sufficiently to allow safe
vehicular traffic on all lanes. The services include, but are not limited to, cutting and
removing vegetative debris and other debris to a point two feet beyond the curb and
gutter section or to a point two feet beyond the edge of the pavement.
• Provide traffic control (day and/or night).
• Coordinate with Utility Companies, as required, to permit safe removal of debris
Page 55 of 73
Pricing Schedule
A. Right of Way (ROW) Clearing and/or removing debris from the public right-
of-way, streets and roads
1. Load and Haul vegetative debris to a Debris Management Site (DMS):
$ per cubic yard for 0-5 miles, one-way haul
$ per cubis yard for 5.1-10 miles, one-way haul
$ per cubic yard for 10.1-15 miles, one way haul
2. Load and Haul Conshuction and Demolition (C&D) and Mixed Debris to a Debris
Management Site (DMS)
$ per cubic yard for 0-5 miles, one-way haul
$ per cubis yard for 5.1-10 miles, one-way haul
$ per cubic yard for 10.1-15 miles, one way haul
3. Load and Haul C&D and Mixed Debris directly to final disposal
$ per cubic yard for 0-5 miles, one-way haul
$ per cubis yard for 5.1-10 miles, one-way haul
$ per cubic yard for 10.1-15 miles, one way haul
B. Management and operation of DMS to accept, process, and reduce disaster
related debris
1. The cost associated with managing, accepting, processing, and reducing vegetative debris
through grinding
$ per cubic yard
2. The cost associated with managing, accepting, processing, and reducing vegetative debris
through burning,
$ per cubic yard
3. The cost associated with managing, accepting, processing, and reducing construction and
demolition debris through compaction
$ per cubic yard
C. Haul out
Haul out residual debris to final disposal
$ per cubic yard for 0-15 miles, one-way haul
$ per cubis yard for 15.1-30 miles, one-way haul
Page 56 of 73
$ per cubic yard for 30.1-60 miles, one way haul
D. Right of Way (ROW) stumps
Removal and Disposal of hazardous stumps from the ROW
24" diameter and up, but less than 36" diameter:
36" diameter and up, but less than 48" diameter:
48" diameter and up, but less than 72" diameter:
Equal to or greater than 72" diameter:
Removal of non -hazardous stumps from the ROW placed
There by others(as per FEMA Stump Conversion Table)
$ ea
$ ea
$ ea
$ ea
$ CY
E. Right of Way (ROW) cutting partially uprooted or split trees (Leaners)
Falling partially uprooted or split trees from the ROW or the overhanging portion of the ROW and
placing the debris in the ROW for removal as ROW debris
1. Partially uprooted leaner (price is inclusive of excavating the root ball and placing it in the
ROW)
*Less than 24" $ per tree
*24-36" $ per tree
*Greater than 36" $ per tree
* Diameter of tree at 2 feet from base
F. Right of Way (ROW) removal of dangerous hanging limbs (Hangers)
Removing hanging or partially broken limbs from trees in the ROW or limbs hanging over the
ROW and placing the debris in the ROW for removal as ROW debris
tree
G. Private Property Debris Removal (PPDR)
Load and Haul vegetative debris to a Debris Management Site (DMS):
$ per cubic yard for 0-5 miles, one-way hail
$ per cubis yard for 5.1-10 miles, one-way hail
$ per cubic yard for 10.1-15 miles, one way haul
Load and Haul Construction and Demolition (C&D) debris to a Debris Management Site (DMS)
$ per cubic yard for 0-5 miles, one-way haul
$ per cubis yard for 5.1-10 miles, one-way haul
Page 57 of 73
$ per cubic yard for 10.1-15 miles, one way haul
Load and Haut C&D directly to final disposal
$ per cubic yard for 0-5 miles, one-way haul
$ per cubis yard for 5.1-10 miles, one-way haul
r
$ ner cubic yard for 10.1-15 miles, one way haul
The cost associated with the removal of hazardous stumps from the ROE will be invoiced utilizing
the following categories:
24"
diameter and
up, but less than
36"
diameter:
$ ea
36"
diameter and
up, but less than
48"
diameter:
$ ea
48"
diameter and
up, but less than
72"
diameter:
$ ea
Equal to or greater than 72" diameter:
Uprooted or Split Trees(Leaners) $ ea
Falling partially uprooted or split trees from private property or the overhanging portion of the
private property and placing the debris in the ROW for removal as regular debris.
a. Partially uprooted leaner (price is inclusive of excavating the root ball and placing it in the
ROW)
*Less than 24" $ per tree
*24 — 36" $ per tree
*Greater than 36" $ per tree
* Diameter of tree at 2 feet from base
Removal of dangerous hanging limbs (Hangers)
Removing hanging or partially broken limbs from trees in ROE or limbs hanging over the ROE and
placing the debris in the ROW for haul -off. This includes all traffic control and safety measures.
tree
H. Canal silt removal and disposal
Marine based removal:
0-5 mile one way haul $
5.1-10 mile one way haul $
10.1-15 mile one way haul $
Land based removal:
0-5 mile one way haul $
5.1-10 mile one way haul $
10.1-15 mile one way haul $
I. Drainage ditches silt and debris removal
Ditch width 0-4.0 feet $
per cubic yard
per cubic yard
_ per cubic yard
per cubic yard
per cubic yard
per cubic yard
per linear foot
Page 58 of 73
Ditch width 4.1-8 feet $
per linear foot
Ditch width 8.1-12 feet $
per linear foot
Ditch width 12.1-16 feet $
per linear foot
Ditch width 16.1-20 feet $ per linear foot
Ditch width 20.1-30 feet $ per linear foot
Debris to be placed on the ROW for collection as regular debris.
Silt to be hauled and disposed of at $ per cubic yard
J. Cleaning and clearing of storm drain lines
Drain Line Diameter 0-15.0 inches
$ per linear foot
Drain Line Diameter 15.01-36 inches
$ per linear foot
Debris to be placed on the ROW for collection as regular debris.
Silt to be hauled and disposed of at $ per cubic yard
K. Cleaning and clearing of catch basins and inlets
4 ` X 4'
$
each
8' X 8'
$
each
10, X 10,
$
each
20' X 20'
$
each
L. Sand collection (Public Property) and screening rate
Removal and collection of debris -laden sand fioni public properly. Debris -laden sand will be
hauled to a designated location, screened, and stockpiled at a debris management site(s) and clean
sand returned and dumped on beach. (Debris generated fi•onr screened rejects will be hauled to a
debris management sitc(s) or other designated location according to debris collection rates).
per cubic yard for 0-15 miles, one-way haul
per cubis yard for 16-30 miles, one-way haul
cubic yard for 31-60 miles, one way haul
Sand collection (Private Property) and screening rate
Removal and collection of debris -laden sand from public property. Debris -laden sand will be
hauled to a designated location, screened, and stockpiled at a debris management site(s) and clean
sand returned and dumped on beach. (Debris generated from screened rejects will be hauled to a
debris management site(s) or other designated location according to debris collection rates).
cubic yard for 0-15 miles, one-way haul
cubis yard for 16-30 miles, one-way haul
$ per cubic yard for 31-60 miles, one way haul
M. Baelcfill
Page 59 of 73
Supply and placement of clean fill dirt into holes created by stump removal in the ROW.
$ per cubic yard
N. Removal and destruction of carcass
$ per pound
O. Loading and hauling of white goods
$ per unit
P. Removal and disposal of freon
$ _.. per unit
Q. Sunken vessel removal
Price proposal for vessel salvage and recovery:
1. Marine based salvage operations:
a. Recreational vessels up to 24' in length
1. Flat & V- Hulled Vessels $ per linear foot
2. Keeled Vessels $ per linear foot
b. Recreational vessels 25' up to 35' in length
1. Flat & V- Hulled Vessels $ per linear foot
2. Keeled Vessels $ per linear foot
c. Recreational vessels 25' up to 36' in length
I Flat & V- Hulled Vessels $ per linear foot
2. Keeled Vessels $_ per linear foot
d. Recreational vessels 36' up to 48' in length
1. Flat & V- Hulled Vessels $ per linear foot
2. Keeled Vessels $ ner linear foot
e. Recreational vessels above 48' in length
1. Flat & V- Hulle Vessels $ per linear foot
2. Keeled Vessels $ per linear foot
2. Land based salvage operations:
a. Recreational vessels up to 24' in length
Page 60 of 73
1. Flat & V- Hulled Vessels $
per linear foot
2. Keeled Vessels $
per linear foot
b. Recreational vessels 25' up to 35' in length
1. Flat & V- Hulled Vessels $
per linear foot
2. Keeled Vessels $
per linear foot
c. Recreational vessels 25' up to 36' in length
I Flat & V- Hulled Vessels $
per linear foot
2. Keeled Vessels $
per linear foot
d. Recreational vessels 36' up to 48'nt length
1. Flat & V- Hulled Vessels $
per linear foot
2. Keeled Vessels $
per linear foot
e. Recreational vessels above 48' in length
1. Flat & V- Halle Vessels $
per linear foot
2. Keeled Vessels $
per linear foot
R. Derelict vehicle and vessel removal (from land)
Pricing proposal for vehicle and vessel recovery:
1. Transfer/Tow of typical passenger car: $
ea
2. Transfer/Tow and handling of
Recreational vessels up to 24' in length
a. Flat & V- Hulled Vessels $
per linear foot
b. Keeled Vessels $
per linear foot
3. Transfer/Tow and handling of
Recreational vessels 25' up to 35' in length
a. Flat & V- Hulled Vessels $
per linear foot
b. Keeled Vessels $
per linear foot
4. Transfer/Tow and handling of
Recreational vessels 25' up to 36' in length
a. Flat & V- Hulled Vessels $
per linear foot
b. Keeled Vessels $
per linear foot
S. Transfer/Tow and handling of
Page 61 of 73
Recreational vessels 36' up to 48' in length
a. Flat & V- Hulled Vessels $ per linear foot
b. Keeled Vessels $ per linear foot
6. Transfer/Tow and handling or
Recreational vessels above 48' in length
a. Flat & V- Hulle Vessels $ per linear foot
b. Keeled Vessels $ per linear foot
S. Operation of secure aggregation site for vehicles and vessels:
$ per day
T. Travel trailer installation and maintenance
Price proposal for hailer installation:
Basic Trailer Installation:
$
per trailer
As needed services:
Buried Sewer Line:
$
per linear foot
Install Sewer Tap:
$
per tap
Buried Water Line:
$
per linear foot
Municipal Water Tap:
$
per tap
Power Pole with Meter:
$
per pole
Water Line Winterization:
$
per linear foot
I landicap Ramp:
$
each
Direct Wiring to Well Pump Switch:
$
per pump
Above Ground Electrical Excess
$
per linear foot
Provide Additional Potable Water Hose:
$
per 25'
Provide and Install Generator:
$
per 5kw gen.
Direct Burial of 50 Amp Service:
$
per linear foot
Handicap Platform Steps
$
each
U. Marine Debris Removal
Price proposal for removal of debris from a marine enviroment, using
either land or marine based
equpment.
1. Vegetative Debris
Land Based:
$
cubic yard
Marine Based:
$
cubic yard
Page 62 of 73
1. C & D and Mixed Debris
Land Based:
$
cubic yard
Marine Based:
$
cubic yard
1. White Goods
Land Based:
$
cubic yard
Marine Based:
$
cubic yard
1. Creosote Timbers
Land Based:
$
cubic yard
Marine Based:
$
cubic yard
1. Tires
Land Based: $ cubic yard
Marine Based: $ cubic yard
1. E-Waste
Land Based: $ cubic yard
Marine Based: $ cubic yard
V. Supplemental water and foots sources
1. Meals Ready to Eat (MRE) (Heater Meals entrees) can be provided at the following cost:
$ per meal with an order of 14,400 meals
2. Meals Ready to Eat (HIRE) (HeaterMeals Plus) can be provided at the following cost:
$ per meal with an order of 14,400 meals
3. SunMeadow Hot Meal: $ one meal cost
SunMeadow Hot Meal Pack: $ one meal cost
SunMeadow 3-meal Pack: $ cost per pack
4. 1-Liter bottled water in cases (12 per case): $ per case
I -Gallon bottled water in cases (4 per case): $ per case
5. Emergency Ice: $ per 7 lb. bag
Trucking and storing of above listed items shall be invoiced at actual cost plus % mark up.
W. Demolition of structures
1. Structure demolition with construction and demolition debris loaded at the designated work
zone and hauled to an approved commercial landfill. Contactor shall disconnect and cap the sewer
and water line and coordinate all required disconnects by private utility companies. Search safely
accessible structures, Including garages and detached outbuildings, and remove all white goods, e-
waste and household hazardous waste for ROW collection. Does not include removal of concrete
slabs.
Page 63 of 73
0-5 mile one way haul $ per cubic yard
51: 10 mile one way haul $ per cubic yard
10.1-15 mile one way haul $ per cubic yard
2. Structure demolition with RACM construction and demolition debris loaded at the designated
work zone and hauled to an approved Type 1/1I landfill. Contractor shall disconnect and cap the
sewer and water line and coordinate all required disconnects by private utility companies. Search
safely accessible structures, including garages and detached outbuildings, and remove all white
goods, e-waste and household hazardous waste for ROW collection. Does not include removal of
concrete slabs.
0-5 mile one way haul
$
per cubic yard
5.1-10 mile one way haul
$
per cubic yard
10.1-15 mile one way haul
$
per cubic yard
15.1-30 mile one way haul
$
per cubic yard
30.1-60 mile one way haul
$
per cubic yard
X. Concrete removal
1. Contractor to load and haul broken concrete from the ROW and dispose at an Owner approved
site:
0-5 mile one way haul
5.1-10 mile one way haul
10.1-15 mile one way haul
per cubic yard
per cubic yard
per cubic yard
2. Contractor to demolish concrete slabs and haul and dispose at an Owner approved site:
0-15 mile one way haul $ per cubic yard
15-30 mile one way haul $ per cubic yard
30-60 mile one way haul $ per cubic yard
Y. Creosote timber piling removal
Creosote timber piling removal and disposal
0-15 mile one way haul
15-30 mile one way hard
30-60 mile one way hard
Z. E-Waste
Contractor to collect from ROW and dispose at an owner approved site:
per unit
AA. Household hazardous waste
Contractor to collect from ROW and dispose at an owner approved site:
per pound
BB. Tire removal
The Removal and Disposal or Recycle
CC. River and canal shoreline restoration
per cubic yard
per cubic yard
per cubic yard
each
River and Canal Shoreline Restoration: $ per linear foot
Page 64 of 73
DD. Power sources
Please provide pricing for emergency generators
1) 20kw Generator:
2) 56kw Generator:
3) 100kw Generator:
4) 175kw Generator:
5) 240kw Generator:
6) 320kw Generator:
7) 500kw Generator:
8) I000kw Generator:
EE. Stadium style light tower
$ per month / $
per week
$ per month / $
per week
$ per month / $
per week
$ per month / $
per week
$ per month / $
per week
$ per month/ $
per week
$ per month/ $
per week
$ per month/ $
per week
per month/ $ per week
Shipping, setting, operation, maintenance, fueling, insurance,security and recovery of generators
and lights shall be invoiced at actual cost plus % mark up:
FF. National Incident Management System (NIMS) training
$ per person/per year
GG. Assistance in development of a debris management plan
per year
HH. Additional services and materials as needed
Cost plus _%
(All final disposal fees will be a pass -through cost, with contractor invoicing the agency at actual
cost without additional fees.)
Il. Emergency Road Clearance
The cost associated with emergency road clearance will be billed by hourly rates. See Hourly
Rates below:
E_quipment/Houriv
Unit
Unit Price
Broom- Mechanized
Hour
Bucket Truck- 50 ft.
Hour
Bucket Truck- 50 ft. to 75 ft.
Hour
Chipper w/ 2 man crew Morback Storm
Hour
Crane- Up to 15 ton
Hour
Crane- 30 ton or larger
Hour
Crane- 50 ton
Hour
Crane- 100 ton
Hour
Dozer- CAT D4
Hour
Dozer- CAT D6
Hour
Dozer- CAT D7
Hour
Dozer- CAT D8
Hour
Dump Trailer w/ Tractor, 30 to 40 CY
Hour
Dump Trailer w/ Tractor, 41 to 50 CY
Hour
Dump Trailer w/ Tractor, 51 to 60 CY
Hour
Page 65 of 73
Dump Truck- 16-30 CY
Hour
Dump Truck- 31-60 CY
Hour
Dump Truck- 61-100 CY
Hour
Dump Truck- Trailer, 24-40 CY
Hour
Dump Truck- Trailer, 41-60 CY
Hour
Dump Truck- Trailer, 50-80 CY
Hour
E ui ment transports
Hour
Excavator- Trackhoe? 2-3 cy capacity)
Hour
Excavator- CAT 320
Hour
Excavator- CAT 325
Hour
Excavator- CAT 330
Hour
Excavator- Rubber tired w/ debris grapple
Hour
Forklift- Extends Boom w/ debris grapple
Hour
Fuel Truck 1000gallon)
Hour
Light Plant- Portable
Hour
Loader- Bobcat 753 or JD648-E w/ debris grapple
Hour
Loader- Rubber tired front end 2-5 cy capacity)
Hour
Loader- Front End, 544 orequal w/debris grapple
Hour
Loader- Knuckleboom- 216 Prentice
Hour
Loader- Self, Knuckle Boom Truck, 25-35 CY Body
Hour
Loader- Self, Knuckle Boom Truck, 35-45 CY Body
Hour
Loader- Skid Steer-753 Bobcat w/bucket
Hour
Loader- Steer-753 Bobcat Skid w/ street sweeper
Hour
Loader -Trackhoe 690 JD orequal
Hour
Loader- Wheel, CAT 955
Hour
Loader- Wheel, CAT 966
Hour
Low Bed Equipment Trailer, 35 ton ca acit ,& tractor
Hour
Motor Grader -CAT 125- 140 HP
Hour
Passenger Car
Hour
Passenger Van
Hour
Power Screen
Hour
StumpGrinder/ Vermeer 252
Hour
Trackhoe- CAT 320
Hour
Tractor- Box Blade
Hour
Tree Trimming Truck w/ chipper and Bucket
Hour
Tub Grinder- 12 foot/ Morbark 1200
Hour
Tub Grinder- 13 foot/ Morbark 1300
Hour
Tub Grinder- 14 foot/ Diamond Z 1463
Hour
Tubgrinder- 300-400
Hour
Tubgrinder- Horiz., Diamond Z orequal
Hour
PERSONNEL
Hour
Unit
Price
Administrative Assistant
Hour
Carpenter
Hour
Clerical/ Individual
Hour
Climberw/ ear
Hour
Crew Leader
Hour
Electricians
Hour
Fabricator
Hour
Field technicians
Hour
Foreman
Hour
Foreman w/ truck
Hour
Ins ectorw/vehicle
Hour
Laborer
Hour
Operator w/ chainsaw
Hour
Project Manager
Hour
Security Personnel
Hour
Superintendent w/ truck
Hour
Survey person w/truck
Hour
Page 66 of 73
Traffic Control
Hour
Tree Trimmer crew
Hour
Truck driver
Hour
Vehicle Mechanic
Hour
Welder
Hour
Worker to assist w/ potable water
Hour
Hazardous Material Spill Response - Hazardous Waste Remediation & Mass
Decontamination
Unit
Cost
HAZ MAT Response Pricing
PROJECT CLASSIFICATION
PROJECT COORDINATOR
Hour
FIELD HAZ MATERIAL MANAGER
Hour
HM CONTAIN AREA MANAGER
Hour
FIELD PROJECT SUPERVISOR
Hour
HM CONTAIN AREA SUPERVISOR
Hour
FIELD PROJECT FOREMAN
Hour
HM CONTAINMENT AREA FOREMAN
Hour
FIELD HM TECHNICIAN
Hour
HM CONTAIN AREA TECHNICIAN
Hour
HEALTH & SAFETY SPECIALIST
Hour
PROJECT ENGINEER
Hour
PROJECT GEOLOGIST
Hour
CHEMIST
Hour
REGULATORY MANAGER
Hour
EQUIPMENT OPERATOR
Hour
ASBESTOS ABATEMENT SUPERVISOR
IIour
ASBESTOS ABATEMENT WORKER
Hour
ASBESTOS INSPECTOR
Hour
TRUCK DRIVER
Hour
ADMINISTRATIVE ASSISTANT
Hour
CLERICAL
How.
Additional equipment and Support
VEHICLE S/TRANSPORTATION
PICKUP TRUCK
DAY
PICKUP TRUCK EXTENDED CAB
DAY
PICKUP TRUCK 4 X 4
DAY
PICKUP TRUCK I TON
DAY
BOX TRUCK
DAY
PASSENGER CAR
DAY
20' RESPONSE TRAILER
DAY
36' RESPONSE TRAILER
DAY
OFFICE TRAILER
DAY
FLATBED TRAILER
DAY
VEHICLE USE- PICKUPS, VANS, CARS
MILE
Page 67 of 73
VEHICLE USE- TRAILERS, HEAVY TRUCKS
MILE
12' WORK BOAT W/MOTOR
DAY
12' WORK BOAT W/O MOTOR
DAY
VACUUM TRUCK 3500 GALLON
DAY
PERSONAL PROTECTIVE EQUIPMENT PPE
LEVEL A EMPLOYEE FULLY ENCAPSULATED
SUIT, SCBA, 1 SCBA BOTTLE, GLOVES AND
BOOTS (DOES NOT INCLUDE SUIT, GLOVE, OR
BOOT REPLACEMENT)
DAY
LEVEL B EMPLOYEE PROTECTIVE COVERALL,
SCBA OR AIRLINE RESPIRATOR, GLOVES,
BOOTS, AND HARD HATS (DOES NOT INCLUDE
COVERALL OR GLOVE REPLACE.)
DAY
LEVEL C EMPLOYEE PROTECTIVE COVERALL,
HALF OR FULL FACE RESPIRATOR, CARTRIDGES,
GLOVES, BOOTS, AND HARD HATS (DOES NOT
INCLUDE COVERALL, CARTRIDGE, OR GLOVE
REPLACEMENT)
DAY
SCBA BOTTLES REFILL- AFTER THE FIRST
INCLUDED IN LEVEL A & B CHARGE ABOVE
EACH
CASCADE AIR SYSTEM PER EMPLOYEE
DAY
AIR FILTRATION PANAL
DAY
AIRLINE RESPIRATOR EACH INCLUDES 550 FEET
OF AIRLINE
DAY
RESPIRATOR AIRLINE 50' SECTION
EACH
RESPIRATOR CARTRIDGES
PAIR
LEVEL A SUIT- KAPPLER RESPONDER OR EQUAL
EACH
LEVEL B SUIT- KAPPLER RESPONDER OR EQUAL
EACH
TYVEK
EACH
PROSHIELD
EACH
SARANEX
EACH
ACID SUIT
EACH
RAIN SUIT
EACH
NEOPRENE GLOVES
PAIR
NITRILE GLOVES
PAIR
SILVERSHIELD GLOVES
PAIR
PVC GLOVES
PAIR
COTTON OR LATEX GLOVES
PAIR
LEATHER WORK GLOVES
PAIR
PVC BOOTS (HAZMAX)
PAIR
BOOT COVERS
PAIR
HEARING PROTECTION
PAIR
HIGI I HAZARD PERSONNEL DECONTAMINATION
DAY
LOW HAZARD PERSONNEL DECONTAMINATION
DAY
PORTABLE EYEWASH STATION
DAY
FIRST AID STATION
DAY
PERSONNEL RETRIEVAL SYSTEM
DAY
PERSONNEL RETRIEVAL HARNESS
DAY
MONITORING/SAMPLING EQUIPMENT
COMBUSTIBLE GAS INDICATOR
DAY
TOXIC GAS DETECTOR
DAY
PHOTOIONIZATION DETECTOR
DAY
Page 68 of 73
HAZCAT KIT
DAY
DETECTOR TUBES
TEN PACK
PH PAPER
PACK
SPILL CLASSIFIER
STRIP
PERSONNEL AIR SAMPLING PUMP
DAY
ASBESTOS BULK SAMPLE
EACH
HAND AUGER STAINLESS STEEL
DAY
RECOVERY EQUIPMENT
HAND OPERATED TRANSFER PUMP
DAY
1" DIAPHRAGM PUMP
DAY
2" DIAPHRAGM PUMP
DAY
2" DIAPHRAGM PUMP S. S.
DAY
3" DIAPHRAGM PUMP
DAY
I" SUCTION OR DISCHARGE HOSE
DAY
2" SUCTION OR DISCHARGE HOSE
DAY
3" SUCTION OR DISCHARGE HOSE
DAY
2" CHEMICAL SUCTION OR DISCHARGE HOSE
DAY
3" CHEMICAL SUCTION OR DISCHARGE HOSE
DAY
SMALL COMPRESSOR
DAY
185 CFM COMPRESSOR
DAY
AIRHOSE SECTION
DAY
MISCELLANEOUS EQUIPMENT
SPIKE BAR
DAY
AIRLESS SPRAYER
DAY
PRESSURE WASHER
DAY
WATER HOSE SECTION (GARDEN)
EACH
CUTTING TORCH
DAY
WIRE WELDER
DAY
AIR BLOWER
DAY
HEPA VAC
DAY
BARRELCART
DAY
WHEELBARROW
DAY
OIL DRY SPREADER
DAY
TRAFFIC CONTROL VESTS, CONESS, FLAGS,
BARRELS, ETC. (one crew)
DAY
DRILL WITH BITS
DAY
GROUNDING CABLE AND ROD
DAY
CIRCULAR SAW
DAY
HAND TOOLS PER EMPLOYEE SHOVELS,
SCOOPS, BROOMS, RAKES, HOES, ETC.
DAY
TOOL KIT HAMMERS, PLIERS, SCREWDRIVERS,
ETC.
DAY
WRENCH KIT BUNG WRENCH, SPEED WRENCH,
PIPE WRENCH, SOCKETS, CHANNEL LOCKS
DAY
STEPLADDERS
DAY
EXTENSION LADDERS
DAY
PHOTOGRAPHIC EQUIPMENT
DAY
FLASHLIGHTS
EACH
HANDHELD RADIOS
DAY
Page 69 of 73
MATERIALS/DISPOSABLES
5" X 10' ABSORBENT BOOM- PETROLEUM
EACH
8" X 10' ABSORBENT BOOM- PETROLEUM
EACH
3" X ITABSORBENT BOOM- UNIVERSAL
EACH
ABSORBENT PADS BUNDLE -PETROLEUM
EACH
ABSORBENT PADS BUNDLE -UNIVERSAL
EACH
ABSORBENT CLAY BAG
EACH
OIL DRY
EACH
PEAT MOSS
EACH
VERMICULITE
EACH
SODA ASH BAG
EACH
4 MIL 20 X 100 POLYETHYLENE
EACH
6 MIL 20 X 100 POLYETHYLENE
ROLL
6 MIL BAGS
EACH
DUCTTAPE
ROLL
55-GALLON DRUMS
EACH
55-GALLON DRUM LINERS 10 MIL
EACH
FIBER DRUMS
EACH
30-GALLON OVERPACK
EACH
95-GALLON POLY OVERPACK
EACH
DOT HAZARDOUS WASTE LABELS
EACH
FIRE EXTINGUISHER
EACH
CAUTION/HAZARD TAPE
EACH
RESPIRATOR WIPES
EACH
KAPPLER TAPE
ROLL
Note: All overtime is 1.5 times Hourly Rate f Overtime applies after 8 hours each day
Additional E uipinent
Description
Unit
Unit Price
High Volume Diesel Powered suction lift trash pump with speed
adjustment 4X4
per Month
High Volume Diesel Powered suction lift trash pump with speed
adjustment 6X6
per Month
High Volume Diesel Powered suction lift trash pump with speed
adjustment 8X8
per Month
High Volume Diesel Powered suction lift trash pump with speed
adjustment 12X12
per Month
Composite Quick Connect Suction Hose, 8 ft length, 20psi 4 inch
per Month
Composite Quick Connect Suction Hose, 8 It length, 20psi 6 inch
per Month
Composite Quick Connect Suction Hose, 8 ft length, 20psi 8 inch
per Month
Composite Quick Connect Suction Hose, 8 ft length, 20psi 126 inch
per Month
Quick Connect Discharge Hose, 50 It length, 50psi 4 inch
er Month
Quick Connect Discharge Hose, 50 It length, 50psi 6 inch
per Month
Quick Connect Discharge Hose, 50 ft length, 50psi 8 inch
per Month
Page 70 of 73
Quick Connect Rigid
Piping,
10 ft length,
175
si, 4 inch
per Month
Quick Connect Rigid
Piping,
10 ft length,
175
si, 6 inch
per Month
Quick Connect Rigid
Piping,
10 ft length,
175
si, 8 inch
per Month
Quick Connect Rigid
Piping,
10 ft length,
175
si, 12 inch
per Month
Roll off Emergency
Waste Water Storage Tanks
per Month
Sample Bond Commitment Letter
Page 71 of 73
This is an example of an acceptable commitment letter. The letter must be issued and
signed by the Surety Company, not the Agent, and must be submitted ivith the
proposal.
Date
Re: Surety Bond Commitment
Standby Contract for Emergency Response, Management, & Recovery Services
Dear
I am pleased to advise you that we have approved in principle a $50,000,000
performance and payment bond for your company for the benefit of [Owner].
This performance and payment bond will be for the successful contract completion of
the work set forth in that solicitation REP for a Standby
Contract for Emergency Response, Management and Recovery Services.
Our company is a surety or insurance company currently listed on the U.S.
Department of the Treasury Financial Management Service list of approved bonding
companies which is published annually in the Federal Register, with at least an A -
rating in the latest printing of the A.M. Best's Key Rating guide to write individual
bonds up to ten (10) percent of policyholders' surplus as shown in the A.M. Best's key
rating guide and is licensed to issue surety bonds in the State of
If you are the successfiil proposer on this contract, the performance and payment bond
will be issued within seven (7) days of written notification from the Owner. The bond
will be issued for the total amount of the estimated value of the contract up to
$50,000,000.
This letter constitutes our commitment based upon information and documentation
you have submitted. Any obligation to issue the performance and payment bond will
arise only upon the satisfactory preparation, execution and delivery of documentation
in form and substance satisfactory to our company. This commitment is a valid for a
period of fourteen (14) months from the date hereof.
Sincerely,
Name
Title, Insurance, Surety Company
Proposer's Logo
Page 72 of 73
PROPOSAL FORM
To: Owner
Date:
[ADDRESS]
Re: Request for Proposal
STANDBY CONTRACT FOR EMERGENCY RESPONSE,
MANAGEMENT AND RECOVERY SERVICES
1. The undersigned, having carefully and to our full satisfaction examined the RFP
Documents for: STANDBY EMERGENCY RESPONSE, MANAGEMENT AND
RECOVERY SERVICES hereby proposes to furnish the required services in
accordance with this Proposal.
2. By submission of this Proposal, the undersigned certifies, and in the case of a joint
Proposal, each party hereto certifies as to his own organization and the joint
venture, that this Proposal is made in good faith and has be arrived at
independently, without collusion, consultation, communication or agreement as to
any matter relating to this Proposal with any other Proposer.
Submitted by:
Title:
Authorized Signature:
Company Name (Print)
Phone
Company Address (Print)
City, State, Zip Code (Print)
Federal Tax I.D. Number
Phone/Fax Number (include area code)
(Corporate Seal)
Page 73 of 73
CITY OF SANGER
COUNCIL AGENDA ITEM
AGENDA TYPE M Regular ❑ Special ❑ Consent Reviewed by Finance
❑ Yes
Not Applicable
❑ workshop ❑ Executive ❑ Public Hearing Reviewed by Legal
Yes
I LJ Not Applicable
Council Meeting Date: Submitted By:
March 18, 2013 Joseph D. Miff, AICP
City Manager Reviewed/Approval Initialsm-�—
ACTION REQUESTED: ®ORDINANCE 03.03-13 ❑ RESOLUTION H ❑ APPROVAL
❑ CHANGE ORDER ❑ AGREEMENT ❑ APPROVAL OF BID ❑ AWARD OF CONTRACT
❑ CONSENSUS ❑ OTHER
AGENDA CAPTION
Conduct a Public Hearing, Consider, Discuss, and Possibly Act Regarding a Ordinance 03-03-13
Granting a Specific Use Permit for a Snow Cone Stand (Sno2Go) Into a 770 Square Feet (Approximate)
Paved Area of the Northeast Corner of the Parking lot Located at 701 N. Stemmons.
FINANCIAL SUMMARY
®N/A ❑GRANTFUNDS []OPERATING EXPENSE ❑REVENUE ❑CIP ❑BUDGETED ❑NON -BUDGETED
BACKGROUND/SUMMARY OF ITEM
The subject property is located at the southwest corner I-35 and FM 455 (Chapman Drive), the Super
Save grocery store. The property is zoned B-2 General Business, as are the surrounding properties.
The applicant is proposing to operate a snow cone stand in the parking lot in front of the grocery store.
A snow cone stand is a Quick Service Food and Beverage Stand as defined in the Zoning Ordinance,
and requires a Specific Use Permit (SUP).
Previously, this snow cone stand was installed and operated with an SUP across the street at the Horizon
Convenience Store and Chevron Gas Station.
Staff has received 1 comment from the ublic in suggort of the proposed SUP, and none against.
STAFF OPTIONS & RECOMMENDATION
Staff finds that the proposed installation of the structure and operation of the business meets the
expectations for a Specific Use Permit as described in the Zoning Ordinance and recommends approval.
List of Supporting Documents/Exhibits Attached: Prior Action/Review by Council, Boards, Commissions or Other
• Ordinance 03-03-13 Agencies:
• Applicant's Letter of Intent On March 11, 2013, the Planning & Zoning Commission
• Letter from Super Save conducted a public hearing and recommended approval of
the proposed Specific Use Permit.
• Aerial Photos of Subject Property
ORDINANCE 03-03-13
AN ORDINANCE OF THE CITY OF SANGER, DENTON COUNTY, TEXAS,
AMENDING THE COMPREHENSIVE ZONING ORDINANCE AND CENTRAL
ZONING MAP, AS HERETOFORE AMENDED, BY GRANTING A SPECIFIC USE
PERMIT FOR A QUICK -SERVICE FOOD AND BEVERAGE SHOP WITHIN A B-2
BUSINESS DISTRICT 2 ON PROPERTY LEGALLY DESCRIBED AS TRACT 126
HENRY TIERWESTER SURVEY; PROVIDING FOR THE REPEAL OF ALL
ORDINANCES IN CONFLICT; PROVIDING FOR A SEVERABILITY CLAUSE;
PROVIDING FOR A PENALTY OF FINE NOT TO EXCEED THE SUM OF TWO
THOUSAND DOLLARS ($2,000.00) FOR EACH OFFENSE; AND PROVIDING FOR
AN EFFECTIVE DATE.
WHEREAS, all Requests for Changes in Zoning Classifications were duly filed with the City
of Sanger, Texas, concerning the hereinafter described properties;
WHEREAS, due notice of hearings were made in the time and manner prescribed by law and
the Planning and Zoning Commission of the City of Sanger, Texas, duly covered and
conducted public hearings for the purpose of assessing zoning classification changes on the
hereinafter described properties located in the City of Sanger, Texas; and
WHEREAS, an additional opportunity for all interested persons to be heard was provided by
the City Council of the City of Sanger, Texas, at open meetings, with proper notice posted;
Now Therefore,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF SANGER, TEXAS:
Section 1 That the legal description of the property zoned herein is generally
described as Tract 126 of the Henry Tierwester survey.
Section 2 A Specific Use Permit for a quick -service food and beverage shop is
herby granted for the above described property within a B-2 Business District, subject to the
following conditions:
1. The structure is located in the northeast portion of the property.
2. The structure is located and the business operated so as not to interfere with the safe
movement of vehicles and pedestrians within the parking lot.
Section 3 All ordinances or parts of ordinances in conflict herewith are, to the
extent of such conflict, hereby repealed.
Section 4 It is hereby declared to be the intention of the City Council that the
sections, paragraphs, sentences, clauses, phrases and words of this Ordinance are severable
and, if any word, phrase, clause, sentence, paragraph, or section of this Ordinance shall be
declared unconstitutional by the valid judgment or decree of any court of competent
jurisdiction, such unconstitutionality shall not affect any of the remaining portions of this
Ordinance, since the same would have been enacted by the City Council without the
incorporation in this Ordinance of any such unconstitutional word, phrase, clause, sentence,
paragraph, or section.
Section 5 Any person, firm, or corporation who shall violate any of the
provisions of this article shall be guilty of a misdemeanor and upon conviction shall be fined
in an amount not to exceed the sum of two thousand dollars ($2,000.00) for each offense, and
each and every day such offense shall continue shall be deemed to constitute a separate
offense.
Section 6 This ordinance will take effect immediately from and after its passage
and the publication of the caption, as the law and Charter in such cases provide.
DULY PASSED, APPROVED AND ADOPTED by the City Council of the City of
Sanger, Texas, on this 18th day of March, 2013.
APPROVED:
ATTEST: Mayor Thomas Muir
City Secretary Tami Taber
1009 Sand Stone Drive
Sanger, TX 76266
(940)230-5331
January 17, 2013
Mr. Joeseph Iliff, AICP
City of Sanger, TX
201 Bolivar
Sanger, TX 76266
Dear Mr. Iliff:
Please accept this letter as our letter of intent and request for a Special Use Permit for a portion of the property
located at 701 N. Stemmons, Sanger, TX 76266.
Sno2Go, LLC has operated a Snow Cone Stand, as classified by Texas Department of Health, at 901 N. Sternmons,
Sanger, TX until we recently negotiated a lease with the Super Save 11479 located across the street at 701 N.
Stemmons. The lease which was negotiated earlier last year is effective from December 1, 2012 for a period of
one year with an understanding from the owner that it may be renewed annually. It is Sno2Go's intention to
operate the Snow Cone stand seasonally, from March through October, while leaving the stand setting on its .
location with utilities connected year-round.
Listed below are specific facts required for and supporting the Special Use Permit application:
- The location of the Snow Cone stand, as identified in the lease, is the Northeast portion of the Super
Save Parking lot encompassing approximately 770 square feet of paved area.
- Satellite photographs (Exhibits 1 and 2) are attached showing the overall store area and the proposed
Snow Cone Special Use Permit area.
- The Sno2Go lease provides for use of the existing parking facilities where the snow cone stand is
located.
- The Snow Cone stand, which is smaller than 100 square feet and less than 12 feet high, will be situated
in such a manner as not to impede the visual sight lines of vehicular traffic on the public roads nor in any
traffic lanes of the parking lot.
- The Snow Cone stand is constructed of wood materials, roofed with composition shingles and painted in
the Sanger High School colors.
- Means of access to the stand will be from the Super Save's parking lot and will not impede any public
thoroughfare.
- There is no directly connecting property adjacent to the Snow Cone stand within 200 feet. The property
is separated from other adjacent lands by public roads and highways, including State FM-455 and US
Interstate 35.
Enclosed please find the,SUP application, Site Plan Exhibits, supporting photographs and the appropriate
application fee,
Should you require any additional information or have other requests, please contact me at your convenience at
817-200-3000.
Regards,
I Lt!
Tor Featf zrs-one
HAC, Inc.
d/b/7 Super S7gre
390 N.E. 36"' Street
Oklahoma City, OK 73105-2508
January 1, 2013
Mr. Tony Featherstone
Sno2Go, LLC
1809 Sand Stone Drive
Sanger, TX 76266
RE: Sillier Save 11479, located at 701 N. Stemmons, Sanger, TX
Dear Mr. Featherstone:
In accordance with the terms and conditions in your lease (particularly section 1s), please accept
this letter as my approval for yonr employees, working on the leased premises, to use our
restrooms during yonr normal operating hours.
Should you have any questions or require additional assistance, please feel free to contact me in
my office at the store.
Sincerely,
Store Manager
Super Save #479, 701 N. Stemmons, Sanger, TX 76266
Supermarket area including parking is depicted.
Exhibit 2
l OCII LIl
SNO2GO, LLC Snow Cone stand area
located in the Northeast corner
of the Super Save parking lot.
Area on pavement - approx. 770 sq. ft.
Exhibit 1
CITY OF SANGER
COUNCIL AGENDA ITEM
AGENDA TYPE ® Regular ❑ Special ❑ Consent Reviewed by Finance 10 Yes 10 Not Applicable
❑ Workshop ❑ Executive ❑ Public Hearing Reviewed by Legal Yes Not Applicable
Council Meeting Date: Submitted By:
March 18, 2013 Joseph D. Iliff, AICP
City Manager Reviewed/Approval Initials Date
ACTION REQUESTED: ❑ORDINANCE ❑ RESOLUTION # ® APPROVAL
❑ CHANGE ORDER ❑ AGREEMENT ❑ APPROVAL OF BID ❑ AWARD OF CONTRACT
❑ CONSENSUS ❑ OTHER
AGENDA CAPTION
Consider, Discuss, and Possibly Act on the Final Plat of Lot I of the DATCU-Sanger Addition, Being
a Re -plat of a Portion of Block 15, J. R. Sullivan West Addition, 1.246 Acres of the Rueben Bebee
Survey
FINANCIAL SUMMARY
®N/A ❑GRANT FUNDS ❑OPERATING EXPENSE ❑REVENUE ❑CIP ❑BUDGETED ❑NON -BUDGETED
BACKGROUND/SUMMARY OF ITEM
The subject property is approximately 1.246 acres located at the northeast corner of 10th Street and Plum
Street. The property is the future site of the DATCU credit union.
The submitted final plat would create a buildable lot for the future construction on the site.
STAFF OPTIONS & RECOMMENDATION
City Staff has reviewed the plat. Staff finds the plat to be in conformance with the requirements of the
Subdivision Ordinance and recommends approval.
List of Supporting Documents/Exhibits Attached:
Prior Action/Review by Council, Boards, Commissions or Other
® Aerial Photo of Subject Property
Agencies:
® Proposed DATCU- Sanger Addition
On March 11, 2013, the Planning & Zoning Commission
recommended approval of the plat.
2011 Aerial Photo 10th St. & Plum St.
INilia
ill il I Nil
ITEMS
CITY OF SANGER, TEXAS
GENERAL FUND REVENUE & EXPENDITURES
FEBRUARY28,2D13
YTD
OVERBUDGET
REVENUE -GENERAL FUND
ACTUAL
BUDGET
(UNDER)BUDGET
Taxes
1,927,771
2,418,500
1490,729)
Franchise Fees
75,406
562,600
(507,194)
License & Permits
49,930
86,210
(36,280)
Fire &Ambulance
190,007
466,500
(276.493)
Fines & Forfeitures
72,622
248.112
(175.490)
Other
$3,631
162.300
(108,669)
Solid Waste
281,896
652,000
(370,1)4)
TOTAL REVENUE
2,651,263
4,616,222
(1,964,959)
ACTUAL % BUDGETED REVENUE 57%
YTD
(OVER) BUDGET
EXPENDITURES -GENERAL FUND
ACTUAL
BUDGET
UNDER BUDGET
Administration
208,729
544,026
335,297
Police & Animal Control
575,096
1,366,591
791,495
Fire & Ambulance
281,559
920,110
638,551
Municipal Court
77,815
211.793
133.978
Development Services
92,376
239.169
146,793
Streets
124,715
339,993
215,275
Parks & Recreation
206,742
578,593
371,851
Library
83,044
197,142
114,098
Solid Waste
253,533
560,000
306,467
TOTAL EXPENDITURES
1,903,612
4,957,417
31053,805
REVENUE OVER (UNDER)
EXPENDITURES
747,651
(341,195)
1,088.846
OTHER FINANCING SOURCES (USES)
Transfer from 4A
20,500
(20,500)
Transfer from 4B
20,500
(20,500)
Transfer from Debt Service
110,000
(110,000)
Transfer from Enterprise Fund
200,000
(200,000)
Transfer to Capital Project Fund
CHANGE IN FUND BALANCE
747,651
9,805
737,846
FUND BALANCE - BOY
783,202
773,397
9,605
FUND BALANCE -EOY
1,530,853
783,202
747,651
ACTUAL % OF BUDGETED EXPENDITURES 38%
GENERAL FUND REVENUE - o BMAl__ ctual
BUDGET AND ACTUAL udget
s2.000.000
slsoo,000
$1.000.000 -- _ ..
8-
Taxes FmnMiso Fcos I Llconsoxr MOO I Firo&Ambulance Fines&FORoiNros Ottror SollO Woste
so% 13% N 29% 43%
EXPECTED% OF BUDGETED REVENUE 42%
EXPECTED% OF BUDGETED EXPENDITURES 42%
REVENUE -ENTERPRISE FUND
Water
Wastewater
Tap Fees
Electric
Interest
Miscellaneous
TOTAL REVENUE
ACTUAL % OF BUDGETED REVENUE
CITY OF SANGER, TEXAS
ENTERPRISE FUND REVENUE & EXPENDITURES
FEBRUARY28,2013
OVER BUDGET
YTD ACTUAL
BUDGET
(UNDER)BUDGET
424,510
1,290,119
(865,609)
393,895
1,118.323
(724,428)
168,000
160,000
8,000
2,581,452
7,947,500
(5,266,048)
7,493
29,000
(21,507)
24,303
51,500
(27,197)
3,699,653
10,596,442
(6,896,789)
35%
(OVER) BUDGET
EXPENDITURES -ENTERPRISE FUND
YTD ACTUAL
BUDGET
UNDER BUDGET
Administration
324,916
846,730
521,814
Water
$91,840
1,007,383
615,543
Wastewater
177,834
646,021
468,187
Electric
2,172,080
6,412,483
4,240,403
Debt Service
45,619
781,675
736,056
TOTAL EXPENDITURES
3,112,289
9,694,292
6,582,003
REVENUE OVER (UNDER)
EXPENDITURES
OTHER FINANCING SOURCES (USES)
Transfers to General Fund
Transfers to Capital Project Fund
Transfers to Cap Proj - W W
Transfers to Storm Recovery Fund
CHANGE IN FUND BALANCE
FUND BALANCE -BOY
FUND BALANCE - EOY
587,364 902,150 (314,786)
(200,000)
200,000
(25,000)
(275.000)
250,000
(39,390)
(111,832)
72,443
(53,629)
(154,000)
100,371
469,345
161,318
308,027
6,136,041
5,974,723
161,318
6,605,386
6,136,D41
469,345
ACTUAL% OF BUDGETED EXPENDITURES 32%
ENTERPRISE FUND REVENUE
BUDGET AND ACTUAL
oAmua- meupccr
se.000.000
/
1
)Yi i
ti�lk tli� Y .�
s6.000.000
$5,000,000
_
61,00D,0D0
s3.000,000
s2.000.000
'd
s1,000,u0n
S.
W.We
W.sW for
Tap Foos
Electric
Intorast
Mlscolianoous
33%
35%
105%
34%
26%
47%
EXPECTED % OF BUDGETED REVENUE 42%
®Actual
ENTERPRISE FUND EXPENDITURES
BUDGET AND ACTUAL
®Budget
$6,000,000
N
)$5,000,000
g Y
r 3Y jt i°i � Y iz "�r P9 yr fi � WP tP' ( l�l
rF ro-efl n i r ��
t a�},sl 3n,t� lift I i 1 (ill:Itll j,rY..ShI(} r{tSx
I' p i-11 II
$4,000,000
$3,000,000
-
$2,000,000
$1,000,000
$
Adminbs don
Water
Waffiewater
E1O 1tr
Dobt $ervice
33% 39% 26% 34%
6N.
EXPECTED% OF BUDGETED EXPENDITURES 42%
CITY OF SANGER, TEXAS
INVESTMENT REPORT
FEBRUARY 28, 2013
The Monthly Investment Report is in full compliance with the objectives, restrictions, and strategies as set
forth in the City of Sanger's Investment Policy and Texas Government Code 2266.023, the Public Funds
Investment Act (PFIA).
Ethics Disclosure and Conflicts of Interest
In accordance with the PFIA, investment officers are required to file a disclosure statement with the Texas
Ethics Commission and the governing body if:
a. the officer has a business relationship with a business organization offering to engage in
an investment transaction with the City (as defined in 2266.006 (1) (1-3); or
b. the officer is related within the second degree by affinity or consanguinity, as determined
under Chapter 673 of the Texas Government Code, to an Individual seeking to transact
investment business with the entity. PFIA 2266.006 (1).
Neither of the investment officers are required to file disclosure statements as required by PFIA.
Cheryl Davenport
Director of Finance
Mike Brice
City Manager
CITY OF SANGER, TEXAS
CASH AND INVESTMENTS
FEBRUARY 28, 2013
CASH AND INVESTMENTS
GENERAL FUND
Unrestricted: Cash For Operations
$ 787897
Investments for Operations
559,730
Capital Projects:'Ca i{a1(lmpmueineFfs ,
Restricted: Debt service
Water Deposits
Equipment Replacement
156,732
Hotel Occupancy Tax
11,318
Library
50,057
Keep Sanger Beautiful (KSB)
4,619
Court Technology and Security
3,646
One Plus Donations'
TOTAL CASH AND INVESTMENTS
ENTERPRISE DEBT SERVICE CAPITAL
FUND FUND PROJECTS FUND
$ 2,272,308 S $65,267 $ 105,889
503,689
1,882,666
951,641
323,015
38,992
243
303,430
TOTAL
$ 3,695,185
1,063,419
1,882,666
1,255A71
323,015
195,724
11,318
50,057
4,619
3,646
243
$ 1,573,999 $ 5,972,554 $ 868,697 $ 105,889 $ 8,484,963
Equipment Replacement
2%
CASH ANDINVESTMENTS
December 31, 2012
Water Deposits
4%
Debt service
15%
Cash for Operations
44%
Capital Improvements
( $ 41
22%,
t'99y1
Investmernsfer
Operations
13%
I Cash and Investments as of February 28. 2013
Cash
CASH
Cash
Deposit CD 2375850
LER DEPOSIT REFUND ACC
Capital Reserve CD 642584
Capital Reserve MM 2380226
Acct. # Maturity
Yield
008-00-1010
0.05% $
008-00-1010
008-00-1041 1/3/2014
0.05% $
0.60%
008-00-1044 4/23/2013
008-00-1038
004-00-1020
0.25% $
020%
Balance
Restri
2,272,308
2,272,308"
94,841
Y
228,174
Y
323,015':
278,594
Y
386,225
Y
Water Capital Reserve MM 2376156
008-00-1037
0.20%
$
330,860
Water Capital Reserve CD 459844
008-00-1043
7/3/2013
0.35%
641,157
WATER CAPITAL RESERVE
$
972,017
Combined EF Debt Service MM 2376113
008-00-1039
0.20%
$
588,149
EF Bond Reserve CD 459585
008-00-1046
1/3/2014
0.06%
349,683
99 &96 Bond Reserve MM 2381400
008-00-1033
0.08%
13,8D9
BOND FUND RESERVES
$ `,
951,841
EF Reserve CD 642541
008-00-1040
3/25/2013
0.45%
$
102,750
EF Contingency Reserve CD 459739
008-00-1047
1/3/2014
0.05%
16,212
EF Contingency Reserve CD 737860
008-00-1014
2/14/2013
0.90%
305,520
EF Contingency Reserve MM 2809753
008-00-1012
0.12%
25,578
PF ,Qtnrm Rcenvani - 90/ Flcrtrlr Rov
co con
Y
Y
Y
Y
Y
Equipment Replacement MM 2376202 008-00-1034 0.12% $ 38,992 Y
Plus 008-00-2605 0.05% 243 Y
Cash and
Investments
as of February 28,
2013
4A Certificates of Deposit, Money Market, and Cash
Name
Acct. #
Maturity
Yield
Balance
Restricted
Pooled Cash
41-00-1000
0.05% $
145,809
Y
Cash NOW 900020693 Prosperity
41-00-1010
24,817
Y
4A MM 902551273 Prosperity
41-00-1012
0.20%
638,033
Y
Sanger TX Ind Corp CD 486639
41-00-1013
4/2/2013
0.35%
93,462
Y
TOTAL CASH AND INVESTMENTS $
902;121
4B Certificates of Deposit, Moneys Market,
and Cash Acct.
Name
Acct. #
Maturity
Yield
Balance
Restricted
Pooled Cash
42-00-1000
0.05% $
5,595
Y
Cash MM 2379694
42-00-1010
0.05%
275,688
Y
4B CD 653500
42-00-1013
4/3/2013
1.30%
21,277
Y
4B CD 659924
42-00-1014
5/12/2013
0.80%
20,992
Y
4B CD 664243
42-00-1015
6/5/2013
0.90%
21,110
Y
46 CD 673277
42-00-1016
7/9/2013
0.80%
21,047
Y
4B CD 686115
42-00-1017
8/14/2013
0.60%
21,015
Y
4B CD 689521
42-00-1018
9/11/2013
0.60%
20,931
Y
4B CD 694371
42-00-1019
10/14/2013
0.70%
20,978
Y
4B CD 697230
42-00-1020
11/17/2012
1.30%
21,091
Y
4B CD 699934
42-00-1021
12/18/2012
1.25%
21,044
Y
4B CD 702285
42-00-1022
1/13/2014
0.50%
20,857
Y
4B CD 706078
42-00-1023
2/19/2013
1.30%
20,772
Y
4B CD 720097
42-00-1024
6/9/2013
1.00%
20,531
Y
4B CD 720119
42-00-1025
3/9/2013
0.80%
20,569
Y
TOTAL CASH AND INVESTMENTS - $
a' S3,497'
Cash and Investments as of February 28, 2013
Capital "sProiects Fund'
Cash and Investments 999-00-1000 $ 105,889
CIP TOTAL $
Debt'Service rFund
Cash and Investments 003-00-1010 $ 868,697
DSF TOTAL $ 868,697 wk„a efiCas x aY:,5 en
SANGER PUBLIC LIBRARY
MONTHLY REPORT
FEBRUARY 2013
Submitted by Victoria Elieson
HIGHLIGHTS:
Submitted the annual report to the State of Texas. Selected statistics from that report:
2011
2012
Collection
22,397
21,900
Circulation
39,246
38,888
Program Attendance
2,239
2,612
Library visits
56,370
56,896
Interlibrary Loans Received
67
52
Interlibrary Loans Sent
76
231
Uses of Public Computers
10,637
10,293
ADMINISTRATION:
Consulted with Daniel Gibbs from Ardmore Public Library who wanted to see CASSIE
software in action. We also discussed Evergreen software.
Provided the meeting room for VITA, volunteers who help people fill out and file their
tax forms.
Meetings attended:
Denton County Library Advisory Board, 2/21, Denton north branch
North Texas Library Consortium, 2/21, Roanoke
PROGRAMS:
Adult programs held: Everything We Want to Know about Cell and Smart Phones,
Toxins in Personal Care Products, two Knitting and Crochet workshops, and the book club
meeting.
Two gaming events were held for the teens.
The Storytime Theme was "All About Me". Weekly themes were "My Name", "My
Feelings", "My Body" and "I Am Special'. One of the favorite crafts was the frill body outline
that the kids decorated and took home. One gaming event was held for the pre -teens.
FEBRUARY 2013 STATISTICS
2012
2013
BORROWER CARDS
Last Month
3,556
3,314
New Cards
35
42
Cards reactivated
13
13
TOTAL
3,604
3,369
CIRCULATION
Nonfiction
269
354
Fiction
599
560
Junior Fiction
152
199
Children's Books
571
404
Leased Books
161
126
Interlibrary Loan
8
98
Spanish Materials
24
17
Audio Books
103
146
Music CDs
25
18
Video Materials
607
640
Equipment
6
6
from other libraries
152
200
TOTAL CIRCULATION
2,677
2,688
to other libraries
62
78
INTERNET SESSIONS
655
628
PROGRAMS
Children's Programs
10
9
Children Attending
103
57
Adults Attending
44
20
Teen Programs
3
2
Number Attending
56
25
Other Programs
15
5
Number Attending
65
40
VOLUNTEERS
Number of Adults
13
10
Number of Juniors
1
2
Number of Hours
90
67
COLLECTION
Books
16,798
16,659
Leased Books
186
153
Paperback Fiction
2,426
2,467
Audio Books
799
808
Music CDs
379
357
CD-ROM
198
191
Videocassettes
841
711
DVD
1,024
1,173
Microfilm
84
86
Equipment
4
4
TOTAL COLLECTION
22,739
22,609
:7y9:101OL:
Fines
$188.25
$206.79
Copies
$153.85
$231.06
ILL Postage
$4.75
$12.92
New Cards
$3.00
$3.50
Lost Materials
$26.84
$42.94
TOTAL
$376.69
$497.21
-21 ^6- z8
Sanger 1 jb�e Llbr&yBy Lynne. S. Smiland
s in Health & Beauty Products
Thursday, February 28, at 7 p.m., Dr. Judy Spira, RN,
CBN, PhD and biology professor, will present "Toxins in
Personal Care Items". This free program will examine
many of the additives found in health and beauty products.
Dr. Spits, teaches at UNT and also consults with organiza-
tions such as various DFW area police departments, Sally
Beauty, and American Airlines. She is on a mission to re-
duce toxins in our lives: as additives to foods, in. personal
care items, and in harsh cleaning products.
One often overlooked way people are exposed to toxins
is through beauty or personal care products, such as sham-
poo, deodorant, makeup and even sunscreen. Because the
FDA doesn't regulate the cosmetics industry, potentially
dangerous components and contaminants (including chem-
icals banned in Europe and Australia for being carcinogen -
Few :2-5-
ic) are often found in such products, even in baby shampoo
and wipes.
An example is parabens, a group of compounds widely
used as preservatives and found in many lotions, creams,
and deodorants. They can be absorbed through the skin,
and according to the Breast Cancer Fund, have been identi-
fied in biopsy samples from breast tumors.
To learn about commonadditivesin personal care
and beauty items, the problems they may cause, and how
to avoid them to protect yourself and your family, plan to
attend Dr. Spira's presentation on the 28th. To reserve a
place, call 940-458.3257, e-mail us at library@sangertexas.
org, come by 501 Bolivar, or "Like" the program on the
library's Facebook page to ensurepleptyof handouts for
everyone.
—.
Library program offers information
on toxins in personal care items
A free program %itled "Toxins in
Personal Care Items" will be offered at 7
p.m. Thursday at the Sanger Public
Library, according to a library press
release.
Guest speaker Judy Spira, RN, CBN,
Ph.D., will discuss common additives in
personal care and beauty items, the
problems they could cause and how to
avoid them.
Spira is a biology professorat the
University of North Texas and is a con-
sultant for area police departments and
companies, the press release stated.
Reservations are requested to ensure
therewill be enough handoutsfor all par-
ticipants.'Ib reserve a spot at the pro-
gram, visit the library at 501 Bolivar St.,
call 940-458-3257 or e-mail library@
sangertexas.org.
All American Dogs -Sanger
November December
Impounded
Dogs
Cats
Adoption -Dog
Adoption -Cat
Rescue Pick Up
Owner Pick Up -Dog
Owner Pick Up -Cat
Release to Barn -Cat
Died
Euthanized
Total In Process
January February YTD
16
19
9
10
54
6
2
3
3
14
3
4
7
6
20
1
3
1
2
7
0
1
8
0
9
5
12
4
5
26
0
0
0
0
0
2
1
0
1
4
i
0
0
1
0
1
0
0
1
1
2
11
14
4
7