11/01/2021-CC-Agenda Packet-Work SessionAGENDA
CITY COUNCIL WORK SESSION
MONDAY, NOVEMBER 1, 2021
6:00 PM
HISTORIC CHURCH BUILDING 403 N 7TH STREET
SANGER, TEXAS
1.Call Meeting to Order
2.LAKES AT LANE RANCH PRESENTATION
Presentation of proposed Lakes at Lane Ranch Development. (Hammonds)
3.CAPITAL IMPROVEMENT PROGRAM PROCESS
Presentation by Engineering on General Capital Improvement Program Project Process. (LaPiene)
4.Overview of Items on the Regular Agenda
5.Adjourn
I, the undersigned authority, do hereby certify that this Notice of Meeting was posted on the City
Website, and on the bulletin board, at the City Hall of the City of Sanger, Texas, a place convenient and
readily accessible to the general public at all times. Said notice was posted on the following date and
time, and remained posted continuously for at least 72 hours prior to the scheduled time of said meeting
and shall remain posted until meeting is adjourned.
October 28, 2021, 4:00 PM
Kelly Edwards, City Secretary
City of Sanger, Texas
Date/Time Posted
This facility is wheelchair accessible and accessible parking spaces are available. Requests for additional
accommodations or interpretive services must be made 48 hours prior to this meeting. Please contact the City
Secretary's office at (940) 4587930 for further information.
Page 1
CITY COUNCIL AGENDA MEMO
AGENDA ITEM NO. 2.
AGENDA MEETING DATE: November 1, 2021
TO: John Noblitt, City Manager
FROM: Ramie Hammonds, Development Service Director
ITEM/CAPTION:
LAKES AT LANE RANCH PRESENTATION
Presentation of proposed Lakes at Lane Ranch Development. (Hammonds)
AGENDA TYPE: Work Session
ACTION REQUESTED: Presentation
BACKGROUND:
Presentation by developer for a potential mixed use development.
LEGAL/BOARD COMMISSION RECOMMENDATIONS/CITIZEN NOTICE FEEDBACK:
N/A
FINANCIAL SUMMARY FUNDING/FISCAL IMPACT:
N/A
FUNDS:
N/A
STAFF RECOMMENDATION/ACTION DESIRED:
N/A
Page 2
CITY COUNCIL AGENDA MEMO
AGENDA ITEM NO. 3.
AGENDA MEETING DATE: November 1, 2021
TO: John Noblitt, City Manager
FROM: Tracy LaPiene, City Engineer
ITEM/CAPTION:
CAPITAL IMPROVEMENT PROGRAM PROCESS
Presentation by Engineering on General Capital Improvement Program Project Process. (LaPiene)
AGENDA TYPE: Work Session
ACTION REQUESTED: Presentation
BACKGROUND:
Staff shall provide a presentation of general processes involved with capital improvement program projects.
LEGAL/BOARD COMMISSION RECOMMENDATIONS/CITIZEN NOTICE FEEDBACK:
NA
FINANCIAL SUMMARY FUNDING/FISCAL IMPACT:
NA
FUNDS:
NA
STAFF RECOMMENDATION/ACTION DESIRED:
NA
ATTACHMENTS:
Description Upload Date Type
CIP Project Process Outline 10/22/2021 Presentation
CIP Project Process PPT 10/22/2021 Presentation
Page 3
T. LaPiene 10/21/21 Page 1 of 4
Capital Improvement Program (CIP) Project Process
Strategic Planning – Project Identification
Comprehensive Plan Basis for Infrastructure Planning
Assessing current levels of service.
Identify future needs based on future growth.
Public Buildings
Water and Wastewater Study
Roadway Study
Drainage Study (Not currently under consideration) No proposed drainage or flood reduction
projects in planning.
Preliminary project cost estimates
Project prioritization
Determination of Funding Source / Resources
o Enterprise Capital Project Funds
Electric
Water
Wastewater
Roadway
o Capital Projects Fund
o Bond Package
o Grants
County
TXDOT
State
TWDB/FEMA
o Budget
Best to have list of possible projects to include in RFQ advertisements to get best Professional
Service responses.
Page 4
T. LaPiene 10/21/21 Page 2 of 4
RFQ – Request for Qualifications for Professional Services
Municipalities required to use Quality Based Selection for Professional Services.
Following selection of most qualified firms, cost for particular tasks or project can be negotiated.
If cannot come to agreement or meet budgetary requirements then municipality can move to
the next most qualified firm.
RFQ Process
o Publish RFQ
o RFQ’s in Evaluation – interview
o Select Top 5 Firms in Each Category
o Firms sign “Master Agreement” for each award
Length of Term - Single 3 year term
No renewals
City Council approval of Firm Selection and Issue the list of awarded firms sorted by category
Engineering Services (Possible Categories – may be combined)
o Geotechnical & Construction Materials Testing
o Subsurface Utility Engineering
o Surveying
o Architectural
o Landscape Architecture and Open Areas
o Historical Architecture, Planning, and Preservation Services
o New Construction of Water, Wastewater, & Drainage Facilities
o Rehabilitation of Water, Wastewater, & Drainage Facilities
o New Construction of Roadways
o Rehabilitation of Roadways
o Traffic Engineering, Traffic Planning, and Street Lighting
o Hydraulics & Hydrology/Floodway
o Specialized Services
Structural, ADA/RAS, Land Use Planning, EC, SUE, CA & PM, CI
o General Consulting, Analysis and/or Engineering Studies
Modelling, impact Studies, Feasibility Studies, Master Planning
o Right-of-Way (ROW) Acquisition
o Real Estate Appraisals
Legal
o Preparation of Master Agreement for Professional Services and Engineering Services
between the City of Sanger, Texas and __________
Page 5
T. LaPiene 10/21/21 Page 3 of 4
Projects
Project selection and funding sources determined.
Consultants selected.
o City Council Approval Task Order
Preliminary Engineering
o Preliminary Opinion of Probable Construction Costs (OPCC)
o Determination of Survey needs.
o Determination of ROW or Easement Acquisition Needs
o Determination of individual studies or additional consultants needed.
Project Design
o Engineering design
o Survey
Boundary surveys
Topographic Surveys
Individual property exhibits for ROW or Easement Acquisitions.
o Environmental Study & Analysis
Environmental Study
Archaeological Study (Depending on Funding Source)
Jurisdictional Waters Determination/Delineation
Streams/Channels
Ponds
o Hydraulic Study
Flood Study
CLOMR/LOMR
USACE Permitting
Dam Breach and Hydraulic Capacity Analysis
o Environmental Protection Plan
Greenspace
Storm Water Pollution Prevention Plan
o Traffic Impact Analysis
o TXDOT Permitting
o Citizen/Public Meetings
o Construction Documents
Plans
Specifications
Construction Contract Documents
o Post-Design Opinion of Probable Construction Costs (OPCC)
o Ensure Funding
ROW/Easement Acquisition
Permitting
o FEMA
o USACE
o TXDOT
Bidding
Award of Construction Project
Page 6
T. LaPiene 10/21/21 Page 4 of 4
Construction
o Inspection
Staff or 3rd Party
o Geotechnical and Materials Testing Task Award
o Traffic Control
o Construction Administration
Change Orders
Billing
Review & Coordination of all parties
o Substantial Completion
Financials
Filing
Bonds
Permitting (LOMR)
o Final Acceptance
Page 7
CAPITAL IMPROVEMENT
PROGRAM (CIP)
PROJECT PROCESS
1
Page 8
Comprehensive Plan Basis for Infrastructure Planning
Assessing current levels of service.
Identify future needs based on future growth.
Public Buildings
Water and Wastewater Study
Roadway Study
Drainage Study (Not currently under consideration) No proposed
drainage or flood reduction projects in planning.
Preliminary project cost estimates
Project prioritization
STRATEGIC PLANNING
PROJECT IDENTIFICATION
2
Page 9
Determination of Funding Source / Resources
o Enterprise Capital Project Funds
Electric
Water
Wastewater
Roadway
o Capital Projects Fund
o Bond Package
o Grants
County
TXDOT
State
TWDB/FEMA
o Budget
Best to have list of possible projects to include in RFQ
advertisements to get best Professional Service responses.
STRATEGIC PLANNING
PROJECT IDENTIFICATION
3
Page 10
Municipalities required to use Quality Based Selection for
Professional Services.
Following selection of most qualified firms, cost for particular
tasks or project can be negotiated. If cannot come to agreement or
meet budgetary requirements then municipality can move to the
next most qualified firm.
RFQ Process
o Publish RFQ
o RFQ’s in Evaluation – interview
o Select Top 5 Firms in Each Category
o Firms sign “Master Agreement” for each award
Length of Term - Single 3 year term
No renewals
City Council approval of Firm Selection and Issue the list of
awarded firms sorted by category
REQUEST FOR QUALIFICATIONS FOR
PROFESSIONAL SERVICES (RFQ)
4
Page 11
Engineering Services (Possible Categories – may be combined)
•Geotechnical & Construction Materials Testing
•Subsurface Utility Engineering
•Surveying
•Architectural
•Landscape Architecture and Open Areas
•Historical Architecture, Planning, and Preservation Services
•New Construction of Water, Wastewater, & Drainage Facilities
•Rehabilitation of Water, Wastewater, & Drainage Facilities
•New Construction of Roadways
•Rehabilitation of Roadways
REQUEST FOR QUALIFICATIONS FOR
PROFESSIONAL SERVICES (RFQ)
5
Page 12
Engineering Services (Possible Categories – may be combined)
•Traffic Engineering, Traffic Planning, and Street Lighting
•Hydraulics & Hydrology/Floodway
•Specialized Services
•Structural, ADA/RAS, Land Use Planning, EC, SUE, CA & PM, CI
•General Consulting, Analysis and/or Engineering Studies
•Modelling, impact Studies, Feasibility Studies, Master Planning
•Right-of-Way (ROW) Acquisition
•Real Estate Appraisals
REQUEST FOR QUALIFICATIONS FOR
PROFESSIONAL SERVICES (RFQ)
6
Page 13
Legal
o Preparation of Master Agreement for Professional Services and
Engineering Services between the City of Sanger, Texas and
__________
REQUEST FOR QUALIFICATIONS FOR
PROFESSIONAL SERVICES (RFQ)
7
Page 14
Project selection and funding sources determined.
Consultants selected.
o City Council Approval Task Order
Preliminary Engineering
o Preliminary Opinion of Probable Construction Costs (OPCC)
o Determination of Survey needs.
o Determination of ROW or Easement Acquisition Needs
o Determination of individual studies or additional consultants needed
PROJECT PROCESS
8
Page 15
Engineering design
Survey
o Boundary surveys
o Topographic Surveys
o Individual property exhibits for ROW or Easement Acquisitions.
Environmental Study & Analysis
o Environmental Study
o Archaeological Study (Depending on Funding Source)
o Jurisdictional Waters Determination/Delineation
Streams/Channels
Ponds
Hydraulic Study
o Flood Study
o CLOMR/LOMR
o USACE Permitting
Dam Breach and Hydraulic Capacity Analysis
PROJECT DESIGN
9
Page 16
o Environmental Protection Plan
Greenspace
Storm Water Pollution Prevention Plan
o Traffic Impact Analysis
o TXDOT Permitting
o Citizen/Public Meetings
o Construction Documents
Plans
Specifications
Construction Contract Documents
o Post-Design Opinion of Probable Construction Costs (OPCC)
o Ensure Funding
PROJECT DESIGN
10
Page 17
ROW/Easement Acquisition
Permitting
o FEMA
o USACE
o TXDOT
Bidding
Award of Construction Project
PROJECT DESIGN
11
Page 18
Inspection
o Staff or 3 rd Party
Geotechnical and Materials Testing Task Award
Traffic Control
Construction Administration
o Change Orders
o Billing
o Review & Coordination of all parties
Substantial Completion
o Financials
o Filing
o Bonds
o Permitting (LOMR)
Final Acceptance
CONSTRUCTION
12
Page 19