Loading...
09/16/2019-CC-Agenda Packet-Work SessionAGENDA CITY COUNCIL WORK SESSION MONDAY, SEPTEMBER 16, 2019 6:00 PM 502 ELM STREET SANGER, TEXAS 1.Call Meeting to Order 2.Code Enforcement Overview Staff Presentation and Discussion on the Future Code Enforcement Process.  3.Report on Utility Billing Cycles Report on Utility Billing Cycles Provided by Clayton Gray, Director of Finance. 4.Stream Restoration for Wastewater Treatment Plant Presentation by Plummer  Associates, Inc. Regarding Stream Restoration for Wastewater Treatment Plant. 5.Overview of Items on the Regular Agenda 6.ADJOURN I, the undersigned authority, do hereby certify that this Notice of Meeting was posted on the City Website, and on the bulletin board, at the City Hall of the City of Sanger, Texas, a place convenient and readily accessible to the general public at all times. Said notice was posted on the following date and time, and remained posted continuously for at least 72 hours prior to the scheduled time of said meeting and shall remain posted until meeting is adjourned. September 13, 2019 at 10:45 a.m. Cheryl Price City Secretary City of Sanger, Texas Date/Time Posted This facility is wheelchair accessible and accessible parking spaces are available. Requests for additional accommodations or interpretive services must be made 48 hours prior to this meeting. Please contact the City Secretary's office at (940) 458­7930 for further information. Page 1 CITY COUNCIL AGENDA MEMO AGENDA ITEM NO. 2. AGENDA MEETING DATE: September 16, 2019 TO: Alina Ciocan, City Manager FROM: Ramie Hammonds, Development Service Director ITEM/CAPTION: Code Enforcement Overview Staff Presentation and Discussion on the Future Code Enforcement Process.  AGENDA TYPE: Work Session ACTION REQUESTED:  Other: Presentation BACKGROUND: Code Enforcement has previously served under the Police Department, and is currently being restructured and moved to Development Services. Staff would seek Council guidance on top priorities as we move forward with the newly structured position.  LEGAL/BOARD COMMISSION RECOMMENDATIONS/CITIZEN NOTICE FEEDBACK: N/A FINANCIAL SUMMARY ­ FUNDING/FISCAL IMPACT: N/A FUNDS: N/A STAFF RECOMMENDATION/ACTION DESIRED: N/A Page 2 CITY COUNCIL AGENDA MEMO AGENDA ITEM NO. 3. AGENDA MEETING DATE: September 16, 2019 TO: Alina Ciocan, City Manager FROM: Clayton Gray, Director of Finance ITEM/CAPTION: Report on Utility Billing Cycles Report on Utility Billing Cycles Provided by Clayton Gray, Director of Finance. AGENDA TYPE: Work Session ACTION REQUESTED:  Presentation  BACKGROUND: N/A LEGAL/BOARD COMMISSION RECOMMENDATIONS/CITIZEN NOTICE FEEDBACK: N/A FINANCIAL SUMMARY ­ FUNDING/FISCAL IMPACT: N/A FUNDS: N/A STAFF RECOMMENDATION/ACTION DESIRED: N/A Page 3 CITY COUNCIL AGENDA MEMO AGENDA ITEM NO. 4. AGENDA MEETING DATE: September 16, 2019 TO: Alina Ciocan, City Manager FROM: Tracy LaPiene, City Engineer ITEM/CAPTION: Stream Restoration for Wastewater Treatment Plant Presentation by Plummer  Associates, Inc. Regarding Stream Restoration for Wastewater Treatment Plant. AGENDA TYPE: Work Session ACTION REQUESTED:  Presentation  BACKGROUND: N/A      LEGAL/BOARD COMMISSION RECOMMENDATIONS/CITIZEN NOTICE FEEDBACK: N/A FINANCIAL SUMMARY ­ FUNDING/FISCAL IMPACT: N/A FUNDS: N/A STAFF RECOMMENDATION/ACTION DESIRED: N/A ATTACHMENTS: Description Upload Date Type Engineering Memo 9/12/2019 Cover Memo Page 4 940.458.2059 | 201 Bolivar St. |PO Box 1729 | Sanger, TX 76226 | www.sangertexas.org    facebook.com/SangerTexas     @CityofSanger  ENGINEERING  Memorandum To:  City Council  From:  Tracy A. LaPiene, P.E., C.F.M., City Engineer  Date:  09/12/19  Re:  PSA Plummer Associates, Inc.   City of Sanger Stream Restoration for Wastewater Treatment Plant  The City of Sanger (City) has been prevented from moving forward with the amendment of their Texas  Pollutant Discharge Elimination (TPDES) permit for the wastewater treatment plant for several years.  The  Texas Commission on Environmental Quality (TCEQ) cannot issue a new permit via the current outfall  because water quality modeling has demonstrated that there is no effective effluent set that will maintain  water quality standards in the receiving stream.  Two approaches have been proposed to resolve this  issue:   Restore the receiving stream to conditions that eliminate Paddock Lake, which is the reason the  water quality model will not work (Stream Restoration Approach)   Move the discharge location to below Paddock Lake via a new discharge pipeline (New Outfall  Approach).  The Stream Restoration Approach was first considered, but eventually abandoned due to the many  potential 404 permitting issues and general uncertainty about cost, timing, and acceptability of the  approach to stakeholders. The City began moving toward implementing the New Outfall Approach.   However, obtaining necessary rights‐of‐way for the pipeline has proven difficult.  In addition, there has  been a realization by landowners immediately downstream of the current outfall that the stream flow will  be significantly diminished by the relocation of the outfall to below Paddock Lake.  As a result, the City is  reconsidering the Stream Restoration Approach; without abandoning entirely the New Outfall Approach.  As Plummer Associates, Inc. (f.k.a. Alan Plummer Associates, Inc.) has performed the design for the Sanger  Wastewater Treatment Plant Rehabilitation and Improvements project, the Outfall Pipeline project, has  performed permitting and regulatory support with regard to these projects, and has extensive staff  experience and resources, it is the opinion of City Engineer that Plummer Associates, Inc. is the best  qualified consultant to use for this project.    The City of Sanger has requested Plummer Associates, Inc. to provide professional services associated  with restoring the receiving stream below the City’s wastewater treatment facility to conditions that  eliminate Paddock Lake. This generally includes lowering all or portions of the Paddock Lake dam  sufficiently to eliminate impoundment of water upstream of the dam; restoring stream channels to  connect existing channels above the lake to an existing reach of Ranger Creek below the dam; and planting  riparian vegetation along the restored stream channels. Engineer has identified a number of regulatory,  technical and external considerations to be addressed for completion of the project.     Page 5 Page 2 of 2          Due to uncertainties associated with some of these issues, the City has elected to implement the project  under a phased approach. As proposed, the project will include the following five phases:  Phase 1: Preliminary Planning  Phase 2: TPDES Permitting and Related Enforcement Support  Phase 3: Section 404/401 Permitting  Phase 4: Stream Restoration Design  Phase 5: Stream Restoration Project Implementation    Plummer Associates, Inc. has developed a scope of work for Phase 1, which is described in the attached.    This project shall be funded through the Enterprise Fund.      Page 6 9/16/2019 9/16/2019 Legend South d Dam D'.h.Qa OW— (9,300 LF) — RW*Ud D4.harpa Opt (10.%0 LF) — P.—,y Dn1pn Dnduga Option (9.885 Ck Clad Di-J-9a Option (17,900 LF) NI. Ckal Croak Diadm Option 111.845 L ENT PLANT (st), uJ 5 1,,, 1 PLUMMER 9/16/2019 — DO MG/L — BOD MG/L — NH3_MG/L 0o st f_ 2 Qmy{s - - - _ ------- ---------- �---------�-'DO sty=lffmp]L----------------- km Water quality profiles for RANGER BRANCH. BYP2.out (Flow = 1.86 MGD BOD = 10 NH3 = 2 DO = 4. Used conservative hydraulic parameters for bypass.(. REVIEW — Stream Restoration Concept 1 Plug Ranger Centerline of new Ranger Creek Centerhne of new c Creek(slope=0.016. unnamed tributary Channel and (�oodwaynol p / (chenneland shown) 1 \ IC// floodwaynot` 1 \�1 shown) i r (roseparate %f \� 'o ger Creek from lake. Slope reinfoiccrntnt.as e needed) Slopereinforcementi and nprapatconfluence Two separate cuts L through limestone A spillway REVIEW — Stream Restoration Concept 2 Stream Restoration Approach '-Y1 Stream Restoration Approach (Concept 1) FIGURE I 1� — (CONCEPT I —TWO SEPARATE STREAM CHANNELS) Lakebed to dry out and Note: stream reve etate Create stream $ alignments shown channel for � are for illustration unnamed only Alignments �\ tributary have not been determined. y Create second spillway Create stream channel for Connect to Ranger Creek j historic stream E, channel i -clue c� P"p,�J ror Cal orsa.g" Lower ex g r ddo klckeZ0190617 spillway �, J r ' 11 t'. Stream Restoration Approach (Concept 2) FIGURE 2 (CONCEPT 2 — COMBINED STREAM CHANNELS) Lakebed to dry .1y out and revegetate Create stream channel for unnamed tributary Create stream / channel for Ranger Creek F Lower ex 'tgf "�s eYJ,e C.MVI �Pillway z -N Note: stream alignments shown are for illustration only. Alignments have not been determined. W."0s s Stream Restoration Approach -k� 9/16/2019 • Proposed Phased Approach • Phase 1— Preliminary Planning • Phase 2 — TPDES Permitting and Related Enforcement Support • Phase 3 — Section 404/401 Permitting • Phase 4 — Stream Restoration Design • Phase 5 — Stream Restoration Project Implementation • Only Phase 1 is proposed at this time 13 WASTEWATER TREATMENT PLANT City of Sanger I PLUMMER City of Sanger Flow Chart of Stream Restoration Option -------------------------------------------------------------------------------------------------------------------------- ------------ 1 I L--- --------- --------- ------- 14 WASTEWATER TREATMENT PLANT City of San y, I PLUMMER 7 9/16/2019 I PHASE 1 - PRELIMINARY PLANNING Ira I I_ I 'rcoaTOi u`t.tn'�,. I I I I I rn wnx tear ttm I I t> am re m� I Q <o�ttt I ttNm I I v I i I tort � /\ wntq 0�11 I t*Iv Q I I , til TM tent mat 1 I I 1 I I I I i I I � �tmmwttot � I I I I I I WASTEWATER TREATMENT PLANT Cip'o/Sanger I PWMMER 15 QUESTIONS? Jeff Caffey, P.E. �- jcaffey@plummer.com PLUMMERTim tnoack@plummer.com 1320 SOUTH UNIVERSITY DRIVE SUITE 300 FORT WORTH, TEXAS 76107 16 Lf City of Sanger Flow Chart of Stream Restoration Option ENFORCEMENT (Lloyd Gosselink I I FINALIZE AGREED ORDER IMPLEMENT AGREED ORDER PROVISIONS 1 I WITH TCEG (INCLUDING SUPPLEMENTAL ENVIRONMENTAL PROJECT) ADDITIONAL ENFORCEMENT SUPPORT, AS NEEDED — — — — — — — — — — — — — — — — — — -- — — — — . — — — — — — — — — — - — — — — — — _ — — — — — — — — — —I - — — — — — — — — — I I I PUBLIC COMMENT PERIOD I I PHASE 2 - TPDES PERMITTING I PHASE 1 - PRELIMINARY PLANNING i I MEET TO CONSIDER I I OTHER OPTIONS I CONFIRM WATER PREPARE REVISED TCEQ PERFORMS ADMINISTRATIVE I QUALITY MODEL TP PERMIT SUBMIT TPDES REVIEW µ0 DECLINES TCEG TCEG ISSUES PROVIDE RESPONSE TCEG FINALIZES TCEG ISSUES I RESULTS APPLICATION AND ICA PERMIT APPLICATION ADMWISTRAT VELY PERFORMS DRAFT TPDES TO DRAFT PERMIT TO µD PUBLISHES TPDES PERMIT I I CONSIS.ULTS TH SUPPORTIN APPLICATION COMPLETE MAY REQUIRE SOME ( TECHNICAL PERMIT TCEG FINAL DRAFT TPDES MEET WITH TCEG WATER 5TC I I PLAN "A' DOCUMENTATION TO TCEG REVISIONSS BFIN�� P TO REVIEW PERMIT I QUALITY AND I ENFORCEMENT I DIVISIONS 1 II I L— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — M r — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — CITY ISSUES PHASE 3-4041401 PERMITTING I I CONSTRUCTIONIC NOTICE TO PUBLIC COMMENT PERIOD I I ONSTRUCTION j 1 MANAGEMENT WITH PROJECT I i MEET WITH POSITIVE MEET TO I I I CONDUCT ENVIRONMENTAL PREPARE 4041401 USAGE REVIEWS USA.CE PROVIDE I ( I DEVELOP USAGE (PRE• P$W FROM CONFIRM I STUDIES µD PERMIT SUBMIT 4W401 APPLICATION AND JOINT PUBLIC HOT/CE PUBLIC PROVIDES RESPONSE TO I CONCEPTUAL DESIGN APPLICATION USAGE ON PATH CULTURAL APPLICATION AND APPLICATION PROVIDES COPIES TO PUBLISHED BY USAGE COMMENT SUMMARY OF COMMENTS TO AWARD CONTRACT PLANS MEETING) P1N4,A- FORWIND RESOURCESINVESTIGATION SUPPORTING TO USAGE OTHER AGENCIES FOR pERN%1 COMMEMS TO USAGE I FOR STREAM CONCEPT? WVE371GATION DOCUMENTATION REVIEW CRY RESTORATION I I HOLDERS I I I MEET WITH AGREE Y UPISSUES STAKEHOLDERS WITH I 404 PERMIT 1 i CONCEPT?�Y I I ( I I II I 1 1 I I II i i 1 TCEG REVIEWS TCEQ ISSUE8 401 I APPLICATION FOR 401 WATER QUALITY I I CERTIFlCATION DERTINiAT&; I II 1 I I '-- H I I L. - - - - _.. -. -.. _. _. ._ - ... .,. I MEET TO CONSIDER �. _. -. i .., - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -. .� - - - - - - - - - - -- r - - - CHANGESTOCONCEPT I r - - - - - - - - - - - - - - - - - I - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - J_ - - - I I PHASE 4- DESIGN 1 I I I L------------- 'CAN PRELMINARY DESIGN PREPME 60% PREPME -1PREPME -------------------------- -------- - - FOR STREAM RESTORATION PER DESIGN FOR STREAM DESIGN FOR STREAM FINAL CONSTRUCTION ADVERTISE FOfl SDS FOR STREAM PLµ'A' RESTORATION RESTORATION DOCUMENTS RESTORATION 1 SANGER PATH FORWARD v3.0 L