07/17/1979-PZ-Minutes-Regular (2),,
' '
MINUTES:
PRESENT:
ABSENT:
Planning and Zoning Commission
July 17, 1979
Chairman Armstrong, Willard Bounds, Jimmy Frazier, Billye
Hollingsworth, Harold Easley and Virgil Ward
Cecil Snellgrove
Others Present: City Secretary, Greg Edwards and Wendall Thomas
l. Virgil Ward was sworn in as new Planning and Zoning Commission
member.
2. Minutes of the June 26, 1979 meeting were approved as printed.
3. Final Plat on the Gateway Addition was presented. Greg Edwards
with Schoell and Fields requested by letter the following variances
which Jack Armstrong read to Commission.
l. Location of Sanitary Sewer and Water lines within the street right
of way. This was approved by Planning and Zoning on the preliminary
plat, and provides for best acesss for maintenance purposes for
City of Sanger personnel.
2. Surmountable Curb, Alternate No. 1. This type of curb and gutter
was installed in Forrestridge Section I, a very exclusive subdivision
in Denton, Texas. This type curb allows the homeowner to build
the driveway right up to the curb, and saves the cost of removing
expensive curb and gutter then replacing it with a driveway approach.
This eliminates the waste of pouring then tearing up curb and gutter
and helps hold the cost of housing down.
3. Driveway Gutter Sections, Alternate No. 2. This alternate solution
to the problem and waste involved with removing curb and gutter in
order to install driveways. This alternate provides for adapting
Standard Curb and Gutter to provide for driveway openings at their
anticipated locations. A similar solution was worked in Denton
in Mr. Coffey's subdivision and resulted in substantial savings to
homeowners in that addition.
4. Deletion of reinforcing steel in curb and gutter. The major
function of concrete curb and gutter is to define and beautify the
edge of the roadway and to act as an erosion resistant barrier
to hold storm runoff on the roadway. We feel the Curb and
Gutter without reinforcing steel placed on suitable subgrade
provides this function without the added cost of materials and labor
associated with City of Sanger Standard Curb and Gutter. We feel .
that whatever benefit the reinforcing steel provides does not outweigh
its cost which will eventually be paid by future residents of the
City of Sanger. Other cities which do not require the use.of rein-.
forcing steel include -Bowie, Decatur, Grapevine, North_Richl~nd Hills,
Lewisville, Gainesville, and Denton. We feel that relaxing this
requirement would be a reasonable step in trying to hold down
development costs. Land development costs have been rising at a
rate of approximately 30 percent per year for the past three years.
It now costs as much to develop the 65 foot frontage lots that Mr.
Coffey pla~s as it did to develop 100 foot frontage lots two years
\.
--~· ,t
ago. This staggering inflation must eventually be borne by the
perspective homeowner. We feel that if these variances are granted
that t~ey could reduce the development cost by as much as $400 per lot,
and still insure that Gateway Addition is a high quality development
in which to live.
Commissioners voted on and approved the following:
#1. Motion to accept #1 was made by Harold Easley. Willard Bounds
second. Voted unan.
#2. Motion to accept surmountable curb, Alternative No. l was made
by Jimmy Frazier. Harold Easley second. Voted unan.
Driveway Gutter Sections, Alternative No. 2 was not needed since
Alternative No. l was accepted.
#4 Virgil Ward made the motion not to grant the request for the
deletion of reinforcing steel in curb and gutter, but to stay with
the city ordinance as defined in Article 2-6 Curb and Gutter.
Billye Hollingsworth second. Voted unan.
Harold Easley made the motion to recommend to City Council that
expansion joints and distance for same be added to the subdivision
ordinance. Jimmy Frazier Second. Voted unan.
Chairman Armstrong went over the following list of items which the
City engineer advised was needed before the final plat goes to Council
for approval.
l. We do not have an approved copy of the preliminary plat. The City
should check to see that the final plat conforms with the approved
preliminary plat.
2. From the previously submitted preliminary plat a 15 foot utility
easement was shown for Block D. An easement of 7.5 feet is shown
on the final plat submitted for this block. Mr. Edwards with Shoell,
Fields and Associates indicates the remainder of the easement will
be dedicated with the next section. The City at this time should
request the full 19 foot easement be dedicated in order to be assured
of the full utility easement.
3. The road right-of-way for the road on the east boundary of the
property should be shown. This is the road on the east side of
Lots 16 and 17 of Block A.
4. The surveyor's certification required by the zoning ordinance
should be added to the plat.
5. The right-of-way for Interstate 35 should be shown.
6. The certificate of dedicat1on of streets and easements should
be signed by the owner. All places to be signed and sealed should
be filled prior to presentation to the Planning and Zoning Commission.
7. Building line of 25 feet is required on all lots. The final plat
shows a 15 foot building line on the lots fronting on the Interstate
35 frontage road and other locations.
2
--~ ,,,._,
I
8. The beginning point for the property description should be shown
on the plans.
9. Utility easements should be noted in the street right-of-way and
the rear lot easements deleted if not used. The rear lot easements ·
should remain if electric power is provided from the back of the lots.
On Item No.1.-Gregg Edwards agreed to furnish the City with 6 copies
of the preliminary plat as approved by P & Z.
On Item No. 2--Gregg stated that Mr. Coffey would be in agreement
to give the extra 7½' easement under separate document. Frazier
made the motion to accept the written easement for the extra 7½
feet. Easley second. Voted unan.
It was agreed Item No. 3 would be done before Final Plat is submitted
to Counci 1.
Item No. 4. Greg explained to P & Z that the surNeyor's certificate
as re qui red by the Z on i n g Ord i nan c e cert i f i es Ui a t the corner
monuments shown were already placed. He is requesting that this
be done after construction is completed. Harold Easley made the
motion that P & Z accept the certificate as Gregg Edwards explained.
Frazier second. Voted unan.
Item No. 5. was approved on a motion by Easley. Second by Frazier.
Voted unan.
Item No. 6. to be signed by Jesse Coffey prior to final plat being
submitted to Council.
Item No. 7. The 15' building line was approved on the preliminary
plat.
Item No. 8. was approved on a motion by Billye Hollingsworth. Willard
Bounds second. Voted unan.
Item No. 9. The rear lot easements are to remain as shown. Utility
lines to be in rear of lots.