07/11/2002-PZ-Agenda Packet-RegularAGENDA
PLANNING AND ZONING COMMISSION
THURSDAY, JULY 11, 2002
201 BOLIVAR
6:00 P.M.
1. Call Meeting to Order.
2. Approve Minutes: June 24, 2002
3. Consider and Possible Action on Preliminary Plat for Sable Business Park. Property
is located on the North Bound side of Stemmons Rd.
4. Consider and possible Action on the Final Plat for Sable Business Park, Lot 1, Block 2.
Property is Located on the North Bound side of Stemmons Rd.
5. Adjourn.
OF S11.1r ; f•-
?16As
Rosalie Chavez, City Secre
to,
7A1hY,,2
Dat an Time Posted
This facility is wheelchair accessible and accessible parking spaces are available. Requests for
accommodations or interpretive services must be made 48 hours prior to this meeting. Please
contact the Ci Secrete 's office at 940 458-7930 for further information.
MINUTES: Planning and Zoning
June 24, 2002
PRESENT: Jack Richardson, Ken Perry, Ginger Burt, Ralph Cain, Polly Dwyer, Shelley
Roland, Gail Goodner
OTHERS
PRESENT: City Manager Jack Smith, City Secretary/Assistant City Manager Rose Chavez,
Assistant City Secretary Samantha Renz, Anthony Goode, Burness Higgs, John
Porter, Andy Cochran, Jimmy Evans
1. Jack Richardson called the Meeting to order.
2. Approve Minutes: May 30, 2002
Shelley Roland moved to approve the minutes as presented, Ralph Cain seconded,
Motion carried unanimously.
3. Consider and Possible Action on Final Plat for Eagle Park, Phase H. Property is
Located on F.M. 455.
Shelley Roland asked if the plat complied with the City Engineer's comments.
City Secretary indicated it did comply.
Anthony Goode indicated they had added a common access easement across the front
of the property. The state will only allow them to have two access points off of F.M.
455.
Discussion regarding access to the property.
Polly Dwyer asked if they would construct a fence on the rear side of the lots.
Mr. Porter indicated they would put up a wood fence.
Polly Dwyer indicated although she was concerned about the traffic on F.M. 455 she
felt this was a good development.
Mr. Porter indicated there is additional R.O.W. granted for widening 455.
Shelley Roland asked if the City felt there was adequate sewer facilities with the size
of the line running down to the school.
City Manager indicated it was already in the plans to increase the size of the line.
Shelley Ruland moved to accept the Final, Polly Dwyer seconded, Motion carried
unanimously.
4. Consider and Possible Action on the Preliminary Plat for Quail Run, Being 380
Residential Lots and 2 Open Spaces out of 82.43 Acres Located off of Cowling Road.
Discussion regarding the detention pond.
Polly expressed concerns regarding the pond.
Ralph Cain asked if they would put in a fence around the pond.
City Manager indicated this would probably be dedicated to the City, and the City
would fence it.
City Manager indicated the pond would have relief valves and should not retain water.
Discussion regarding the detention pond and the drainage.
Shelley Ruland asked what the plan for utilizing the 100 ft. wide strip of land dedicated
for parks would be.
City Manager indicated it could be made into a park and jogging trail. It will be
dedicated to the City.
Ginger Burt indicated the lots were small and the density shows to be 4.61 lots per acre,
the ordinance calls for 3 to 3.5 lots per acre.
Polly Dwyer indicated the problem with the old ordinance was the conflict between the
6,000 square foot lots and the 3.5 acre density.
Shelley Ruland asked about accessibility and expressed concerns regarding the traffic.
Jack Richardson asked for staffs recommendation.
City Manager indicated it was to dense, and that the plat shows 10 foot rear setbacks,
and it should be 25 foot.
Shelley Ruland indicated she had spoken to the engineer and that the setback was a
hypo•
Polly Dwyer moved to approve the plat with the stipulation that it be a 25 foot rear
yard, and that the density be reduced from 4.61 to a maximum of 3.5 units per gross
acre. Ginger Burt seconded. Motion was not voted on.
Shelley Ruland indicated that if they put that much stipulation on them, she felt they
needed to take it back to the drawing board, and redo the plat to get the density down.
Discussion regarding the process if they have to come back before the board.
Ralph Cain indicated he felt it was too dense.
Discussion regarding the previous submittal of this plat.
Polly withdrew her original motion and moved to deny the plat based on the high
density and the 10 foot rear setback. Ginger Burt withdrew her second of the previous
motion and seconded the amended motion. Motion carried unanimously.
5. Consider and Possible Action on the Preliminary Plat for Fallmeadows, Phase II & III.
Property is Located on F.M. 455 and Union Hill, in the E.T.J.
Polly Dwyer asked if items on the Engineer letter had been addressed.
Staff indicated they had.
Polly Dwyer asked about the difference in the Preliminary and Final Plat.
Staff indicated that Phase I is completed. They are Preliminary Platting, Phase II &
III, and Final Platting Phase III.
Brief Discussion.
Shelley asked if the City had any concerns regarding this being in our city limits
possibly in the future.
City Manager indicated the city did not have any concerns, because they would
conform to County requirements on the road. Staff recommends approval.
Shelley Ruland moved to accept the Preliminary Plat for Phase H & III of Fall
Meadows Addition. Polly Dwyer seconded. Motion carried unanimously.
6. Consider and Possible Action on the Final Plat for Fallmeadows, Phase II . Property is
Located on F.M. 455 and Union Hill, in the E.T.J.
Discussion regarding the cull -de -sac.
Staff indicated the cull -de -sacs are fine.
Ralph Cain moved to approve the Final Plat on Fall meadows, Phase IL Shelley Ruland
seconded. Motion carried unanimously.
7. Meeting Adjourned.
MEMO
July 5, 2002
To: Planning and Zoning Commission
Fr: Samantha Renz
Re: Sable Business Park
The Engineer's letter is attached, he has indicated the plats (Prelim & Final) comply with the City
of Sanger's subdivision ordinances.
MARK T. OWENS, P.E.
GENERAL CIVIL CONSULTING ENGINEER
Mr. Jack Smith July 3, 2002
City of Sanger
P.O. Box 1729
Sanger, Texas 76266
Re: Sable Business Park
Preliminary Plat, Final Plat and Construction Plans
Final Review
Dear Mr. Smith:
Per your request I have reviewed a Preliminary and Final Plat as prepared and submitted by
Metroplex Surveying, Inc. and Construction Plans prepared and submitted by Webb Design
Group for the project referenced above. Comments are referenced by the Subdivision Ordinance
of the City of Sanger, Texas as adopted September 21,1987, Zoning Ordinance adopted August
3, 1987, and Ordinance No. 05-06-01. My review comments are as follows:
In general the Preliminary Plat, Final Plat, and Construction Plans comply with City ordinances
and with standard engineering practices and principles and I recommend approval.
The developer will be required and has the sole responsibility to obtain a driveway access permit
from the Texas Department of Transportation (TxDOT) and submit the necessary drawings and
application to the City for review and approval prior to submitting to TxDOT.
If you have any questions or need any further information, please call me at (940) 3914845.
Si rely,
DL
Mark T. Owens, P.E.
General Civil Consulting Engineer
Cc: Gary Hammett — Metroplex Surveying, Inc.
Mark Webb — Webb Design Group
roP.,orR. i x r02J
trciinh a tuirJr ria
MEMO
July 5, 2002
To: Honorable Mayor and City Council
Fr: Rosalie Chavez, City Secretary/Assistant City Manager
Re: Capital Improvements
Mark Owens, the City Engineer, will address the Council regarding some of the Capital
Improvement Plans.