Loading...
03/13/2003-PZ-Agenda Packet-RegularAGENDA PLANNING AND ZONING COMMISSION THURSDAY, MARCH 13, 2003 201 BOLIVAR 7:00 P.M. 1. Call Meeting to Order. 2. Approve Minutes: February 13, 2003 February 27, 2003 3. Consider and Possible Action on the Final Plat for Sanger Trails, Phase 2A, Being 8 Residential lots and 2 Common Areas. 4. Adjourn. o���`�rOF S:4�V'�/�ifi Rosalie Chavez, City tary Date and Time Posted PE x This facility is wheelchair accessible and accessible parking spaces are available. Requests for accommodations or interpretive services most be made 48 hours prior to this meeting. Please contact the City Secrete 's office at 940 458-7930 for further information. MEMO March 10, 2003 To: Planning and Zoning Commission Fr: Samantha Renz Re: Sanger Trails, Phase 2A Attached is a copy of the review letter, it is the same letter that was in your last packet; however, the corrections have been made, and this is the resubmittal. The Engineer did review this today; however, he was pressed for time and did not have a chance to write his approval letter. I will try ro have something from him prior to the meeting on Thursday. He did indicate that the items had been addressed on this phase. Phase 2B will be on the agenda for April 3, 2003. MARK T. OWENS, P.E. GENERAL CIVIL CONSULTING ENGINEER February 20, 2003 Mr. Jack Smith City of Sanger P.O. Box 1729 Sanger,Texas 76266 Re: Final Plats and Construction Details — Yd Review Sanger Trails Phase 2A — 8 Residential Lots & 2 Common Areas Sanger Trails Phase 2B — 50 Residential Lots & 2 Common Areas Sanger, Texas Dear Mr. Smith: Per your request I have reviewed final plats and construction details submitted by Cargill- Cheshier & Associates for the project referenced above. Comments are referenced by the Subdivision Ordinance of the City of Sanger, Texas as adopted September 21,1987, Zoning Ordinance adopted August 3,1987, and Ordinance No. 05-06-01. My review comments are as follows: General Comments for Both Phases 1. None of my comments were addressed from my last review in March 2002. 2. All comments received from Public Works, Fire Department and Code Enforcement should also be addressed prior to final plat approval. 3. The property is generally located north of FM 455 west of Marion Road in the eastern portion of the City. 4. Per my last review I requested 15-foot utility easement be placed along all street frontage within the subdivision. In response I was informed by the developer's engineer that the 15-foot easement was not required for final plat for Phase I of this subdivision. I have reviewed the final plat for Phase 1 and no 15-foot easement was provided. It is my recommendation that a 15-foot utility easement be provided in accordance with our ordinance. 5. A legend needs to be provided to identify all abbreviations used within the construction drawings. This will clarify the design and help me in my review. 6. The revision date and number should be shown in the title block for each drawing sheet that has been changed per review comments. 7. I would recommend that approval of these final plats be delayed until offsite improvements have been completed as proposed in Phase 1 of this project. Sanger Trails Phase 2A 1. The final plat and construction drawings are in general compliance with the subdivision ordinance. P.O. Box 59G PONDER, TX 76259 PHONE: 940--391.4845 FAX: 940-479-0593 mdintx,ii igJidc.net MARK T. OWENS, P.E. GENERAL CIVIL CONSULTING ENGINEER Sanger Trails Phase 2B Sheet 5 1. At the end of Silver Spur Drive the proposed grade associated with the grade -to -drain note should be specified or the maximum allowable grade. Sheet 7 1. As per my previous review the developer has agreed to hydromulch all disturbed areas within the proposed detention basin to establish vegetation mainly for bank erosion control. I am concerned that the proposed 3:1 slopes of the basin banks are to steep for routine maintenance of the basin and, frankly, looks like a large hole in the ground which from an aesthetic point of view is not very desirable. I would recommend a minimum of 4:1, preferably 6:1, slopes be utilized to facilitate maintenance and to maintain safety and aesthetic value of the subdivision. I would also recommend to council that the subdivision no be accepted until vegetation has been established over the entire area of the basin. Sheet 11 1. Need to show a detail for a Type "C" headwall a specified for the Silver Spur Drive cross culvert. Sheet 16 1. The manholes located at Stations 0+00 and 2+80.04 of Line "I" have significant drops in them and have not been specified as drop manholes. I would recommend that the inlet flowline elevations be dropped to an elevation of 1/10'e of foot higher than the called out flowline elevation of the outlet. Drops of these types of magnitudes within manholes that have not been designed as drop manholes tend to have problems with odor and should be eliminated wherever possible. If you have any questions or need any further information, please call me at (940) 391-4845. Sincerely; /A! Mark T. Owens, P.E. General Civil Consulting Engineer CC: Roger Hebard P.O. Box 596 PONDER. TX 76259 PHONE: 940-391.4845 FAX: 940-4790593 mdnusta•iS1ide.nct