06/04/2018-CC-Agenda Packet-Work SessionSANGER *TEXAS AGENDA CITY COUNCIL WORK SESSION MONDAY, JUNE 4, 2018 6:00 PM 502 ELM STREET SANGER, TEXAS 1. Call Meeting to Order. 2. Presentation by Perkins Engineering Consultants, Inc. on the Updated Water and Wastewater Capital Improvement Plan. 3. Presentation by Tatum Whitewood on a Proposed Event Pavilion Located at Porter Sports Complex. 4. Overview of Items on Regular Agenda. ADJOURN I, the undersigned authority, do hereby certify that this Notice of Meeting was posted on the bulletin board, at the City Hall of the City of Sanger, Texas, a place convenient and readily accessible to the general public at all times, and said notice was posted on the following date and time: M at 5 ' 00 _e.M. and shall remain posted until meeting ig adjourned. deriana Staton, Deputy City of Sanger, Texas S,4,V . reta ry ' s •. eXAS This facility is wheelchair accessible and accessible parking'P-L are available. Requests for accommodations or interpretive services must be made 48 hours prior to this meeting. Please contact the City Secretary's office at (940) 458-7930 for further information. BANGER T E X A S COUNCIL AGENDA ITEM AGENDA TYPE ❑ Regular ❑ Special ❑ Consent Reviewed by Finance N Workshop ❑ Executive ❑ Public Reviewed by Legal Hearin ❑ Yes ® Not Applicable ❑ Yes N Not Applicable COUNCIL MEETING DATE: SUBMITTED BY: June 4, 2018 Alina Ciocan, Director of Economic & Community Development City Manager Reviewed/Approval Initials Date 03- 30 ACTION REQUESTED: ❑ORDINANCE ❑ RESOLUTION ❑ APPROVAL ❑ CHANGE ORDER ❑ AGREEMENT ❑ APPROVAL OF BID ❑ AWARD OF CONTRACT ❑ CONSENSUS ❑ REAPPOINTMENTS AGENDA CAPTION Presentation by Perkins Engineering Consultants, Inc. on the Updated Water and Wastewater Capital Improvement Plan. FINANCIAL SUMMARY NN/A ❑GRANT FUNDS ❑OPERATING EXPENSE ❑REVENUE ❑CI P ❑BUDGETED ❑NON -BUDGETED 6 FISCAL YEAR: PRIOR YEAR CURRENT YEAR FUTURE YEARS TOTALS Proposed Expenditure Amount Encumbered Amount BALANCE FUND(S) TO BE USED: General ❑$ Utility ❑ $ Special ❑ $ BACKGROUND/SUMMARY OF ITEM Last fall, the City Council approved a contract amendment with Perkins Engineering to update the Water and Wastewater Capital Improvement Plan prepared in 2010. STAFF OPTIONS & RECOMMENDATION List of Supporting Documents/Exhibits Attached: Prior Action/Review by Council, Boards, Commissions or Other Agencies: N/A WATER AND WASTEWATER CAPITAL IMPROVEMENTS PLAN City of Sanger December 2017 Prepared by: 0 PERKINS ENGINEERING CONSULTANTS, INC. TBPE Firm No. 8699 Prepared for: SANGER *TEXAS 12/5/17 City of Sanger Water and Wastewater Capital Improvements Plan Page i Table of Contents Tableof Contents.................................................................................................................................. i Section 1.0 - PROJECT DETAILS AND DESCRIPTION..................................................................... 2 1.1 INTRODUCTION................................................................................................................... 2 1.2 SERVICE AREAS.................................................................................................................. 2 1.3 GROWTH RATE PROJECTIONS......................................................................................... 2 1.4 TCEQ REQUIREMENTS....................................................................................................... 3 Section 2.0 - WATER SUPPLY SYSTEM............................................................................................. 4 2.1 EXISTING SUPPLY INFORMATION..................................................................................... 4 2.2 EXISTING TOTAL STORAGE INFORMATION.................................................................... 5 2.3 EXISTING ELEVATED STORAGE TANK INFORMATION................................................... 7 2.4 EXISTING PUMPING INFORMATION.................................................................................. 7 2.5 RECOMMENDATIONS FOR THE WATER SUPPLY IMPROVEMENTS ............................. 8 2.5.1 2023 WATER SUPPLY IMPROVEMENTS.............................................................. 9 2.5.2 2030 WATER SUPPLY IMPROVEMENTS.............................................................. 9 2.5.3 SUMMARY................................................................................................................9 Section 3.0 - WATER DISTRIBUTION SYSTEM............................................................................... 10 3.1 EXISTING WATER DISTRIBUTION SYSTEM.................................................................... 10 3.2 ANALYSIS OF EXISTING SYSTEM.................................................................................... 10 3.3 PROPOSED DISTRIBUTION SYSTEM IMPROVEMENTS ANALYSIS ............................. 11 3.3.1 FUTURE DEMAND ANALYSIS.............................................................. 12 3.4 2023 PROPOSED DISTRIBUTION SYSTEM IMPROVEMENTS ....................................... 12 3.5 2030 WATER DISTRIBUTION SYSTEM IMPROVEMENTS .............................................. 13 3.6 SUMMARY...........................................................................................................................13 Section 4.0 - SANITARY SEWER COLLECTION SYSTEM.............................................................. 14 4.1 EXISTING COLLECTION SYSTEM.................................................................................... 14 4.2 ANALYSIS OF EXISTING COLLECTION SYSTEM........................................................... 14 4.3 2023 COLLECTION SYSTEM IMPROVEMENTS............................................................... 15 4.4 2030 COLLECTION SYSTEM IMPROVEMENTS............................................................... 15 4.5 SUMMARY...........................................................................................................................16 Section 5.0 - IMPACT FEE ANALYSIS.............................................................................................. 16 5.1 GENERAL............................................................................................................................16 5.2 ANALYSIS METHOLOGY AND SUMMARY....................................................................... 17 City of Sanger Water and Wastewater Capital Improvements Plan Page 2 Section 1.0 - PROJECT DETAILS AND DESCRIPTION 1.1 INTRODUCTION Perkins Engineering Consultants, Inc. (PECI) was retained by the City of Sanger to assist with updating the Master Plan for the City's water and sanitary sewer systems. The scope includes reviewing the water and wastewater system improvements from 2010 to present, preparing new water and wastewater system maps for the existing systems and proposed improvements, developing a recommended impact fee structure for City consideration, and modeling and performing a hydraulic analysis of the existing water system. PECI will assess major elements within the water distribution system to establish compliance with TCEQ minimum standards. This report will discuss the existing systems and minimum required capacity, recommended improvements, and cost estimates for the improvements. PECI utilized information for this report from the following sources: 1) the "Technical Memorandum for Water Supply Improvements for the City of Sanger, October 2014" prepared for the City of Sanger by LNV Engineers; 2) the "Water and Wastewater Master Plan, August 2010" prepared for the City of Sanger by KSA Engineers; 3) Texas Water Development Board (TWDB); 4) City -provided well, pump, tank, customer/user, population and growth data; and, 5) Texas Commission on Environmental Quality (TCEQ). 1.2 SERVICE AREAS The City of Sanger provides water distribution and sanitary sewer collection services to approximately 2,830 connections which represents approximately 7,800 residents and numerous commercial, industrial, and institutional customers within the Sanger city limits. There are approximately 62.3 miles of potable water piping and approximately 35.4 miles of sewer collection piping in the system. The existing water distribution system is shown in Exhibit 01 and the existing sewer collection system is shown in Exhibit 04. Each system is described in the following sections. 1.3 GROWTH RATE PROJECTIONS The growth rates used in the "Water and Wastewater Master Plan, August 2010" prepared for the City of Sanger by KSA Engineers was estimated using the North Central Texas Council of Governments (NCTCOG) 2009 population estimate for the City of Sanger, which at the time estimated 6,950 persons, with a growth rate of 3.73%. In the "Technical Memorandum for Water Supply Improvements for the City of Sanger, October 2014" prepared for the City of Sanger by LNV Engineers, a growth rate of 5% was obtained from the growth experienced by the City over a five (5) year period. For the purposes of this report, a growth rate of 4% will be used. The 4% growth rate was obtained from calculating the average growth experienced by the City from 2011 to 2016, and comparing that growth rate to that projected in the NCTCOG population estimate for the City of Sanger. The projected number of future connections are summarized in Table No. 1— Projected Residential and Total Connections. The additional demands were added in areas where population growth is expected to occur, or in areas where the City anticipates an extension of services. City of Sanger Water and Wastewater Capital Improvements Plan Page 3 Table No. 1 - Projected Residential and Total Connections Growth Rate * = 4% annual rate Ratio of Population to Residential Connections = 2.76 Year Projected Population Projected Residential Connections New Residential Connections per Period New Non - Residential Connections per Period Projected Total Connections 2017 7,800 2,826 82 4 2,830 2018 8,112 2,939 113 4 2,943 2019 8,436 3,057 118 4 31061 2020 8,774 3,179 122 4 31183 2021 9,125 3,306 127 5 3,311 2022 9,490 3,438 132 5 3,443 2023 9,869 3,576 138 5 31581 2024 10,264 3,719 143 5 3,724 2025 10,675 3,868 149 5 3,873 2026 11,102 4,022 155 6 4,028 2027 11,546 4,183 161 6 4,189 2028 12,008 4,351 167 6 41357 2029 12,488 4,525 174 6 4,531 2030 12,988 4,706 181 7 4,712 1.4 TCEQ REQUIREMENTS Under the current Texas Commission on Environmental Quality (TCEQ) regulations (amended December 10, 2009) under Chapter 30 of the Texas Administrative Code (TAC) section 290.45.D., a system with more than 250 connections must meet the following requirements: • The water supply capacity shall have a total capacity of 0.6 gallons per minute (GPM) per connection A total storage capacity of 200 gallons per connection Two or more pumps that have a total capacity of 2.0 gallons per minute (GPM) per connection or that have a total capacity of at least 1,000 gallons per minute (GPM) and the ability to meet peak hourly demands with the largest pump out of service, whichever is less, at each pump station or pressure plane. For systems which provide an elevated storage capacity of 200 gallons per connection, two service pumps with a minimum combined capacity of 0.6 gallons per minute (GPM) per connection, with the largest pump out of service, are required at each pump station or pressure plane. If only wells and elevated storage are provided, service pumps are not required; City of Sanger Water and Wastewater Capital Improvements Plan Page 4 • An elevated storage capacity of 100 gallons per connection or a pressure tank capacity of 20 gallons per connection. If pressure tanks are used, a maximum capacity of 30,000 gallons is sufficient for up to 2,500 connections. An elevated storage capacity of 100 gallons per connection is required for systems with more than 2,500 connections. • Emergency power is requiredfor systems that do not provide100 gallons of elevated storage per connection or an emergency interconnection with another public water system that has emergency powerand is able to supply at least 0.35 gallons per minute (GPM) for each connection in the combined system. • An operating pressure of 35 psi must be maintainedfor each connection inthe system undera peak demand condition of 1.5gallons per minute (GPM) per connection. • A minimum operating pressure of 20 psi is required during fire flow conditions. Section 2.0 - WATER SUPPLY SYSTEM 2.1 EXISTING SUPPLY INFORMATION The City's water service area is located within the city limits and includes the Wal-Mart Distribution Center and several subdivisions, with the Wal-Mart distribution Center being the largest single consumer of potable water with a consumption rate of approximately 100,000 gallons per day (GDP). The City currently owns and operates seven (7) deep water wells drawing from the Antlers formation (within the Trinity Aquifer), and has an interconnection with the Upper Trinity Regional Water District (UTRWD). The Upper Trinity Regional Water District (UTRWD) interconnection supplies 350 gallons per minute (GPM). The City's contract with UTRWD provides the City with up to 0.5 million gallons per day (MGD). Well No. 8 and Well No. 9 are the newest additions to the City's supply, each with a capacity of 725 gallons per minute (GPM), increasing the 2014 well capacity from 1,520 gallons per minute to 2,970 gallons per minute. Table No. 2 — Supply Capacity shows the production of each well and the total rated water supply capacity of 2,970 gallons per minute (GPM) which includes the supply connection to Upper Texoma Regional Water District (UTRWD). The total actual well capacity of the supply system is 2,620 gallons per minute (GPM), which does not include the UTRWD interconnect. Per TCEQ, a minimum of 0.6 gallons per minute (GPM) of water supply per connection is required. The City has reported that it currently has 2,830 connections, equating to approximately 1,698 gallons per minute (GPM) of minimum required capacity. This value is significantly less than the current available supply of 2,970 gallons per minute (GPM), hence, the City is meeting TCEQ minimum requirements for water supply to its customers. City of Sanger Water and Wastewater Capital Improvements Plan Page 5 Table No. 2 - Supply Capacity ITEM UNITS CAPACITY Well No. 2 GPM 80 Well No. 3 GPM 0 Well No. 5 GPM 250 Well No. 6 GPM 265 Well No. 7 GPM 575 Well No. 8 GPM 725 Well No. 9 GPM 725 UTRWD interconnect GPM 350 Total Well Capacity GPM 2,970 Table No. 3 - Minimum Total Supply Capacities shows the minimum water supply requirements (per TCEQ) if the City continues to grow at a rate of 4% per year. This 4% growth rate is based on NCTCOG growth estimates for the City of Sanger and actual growth experienced by the City from 2011 to 2016, as previously shown in Table 1. The City's actual water supply capacity is expected to be sufficient through the year 2030. Table No. 3 - Minimum Total Supply Capacities Connections* Year TCEQ Required Supply (gp►n) Existing Supply (gp►r) Supply Surplus (gpm) 2,830 2017 1,698 2,970 1,272 2,943 2018 1,766 2,970 1,204 3,061 2019 1,837 2,970 1,133 3,183 2020 1,910 2,970 1,060 3,311 2021 1,986 2,970 984 3,443 2022 2,066 2,970 904 3,581 2023 2,149 2,970 821 3,724 2024 2,234 2,970 736 3,873 2025 2,324 2,970 646 4,028 2026 2,417 2,970 553 4,189 2027 2,513 2,970 457 4,357 2028 2,614 2,970 356 4,531 2029 2,719 2,970 251 4,712 2030 2,827 2,970 143 2.2 EXISTING TOTAL STORAGE INFORMATION The City currently has five (5) ground storage tanks totaling 1.2 million gallons and three (3) elevated tanks totaling 1.2 million gallons. Table No. 4-Total Storage Capacity shows the combined total storage capacity to be 2.4 million gallons. City of Sanger Water and Wastewater Capital Improvements Plan Page 6 Table No. 4-Total Storage Capacity ITEM UNITS CURRENT CAPACITY Ground Storage Utility Rd gal 100,000 Ground Storage Yard No. 1 gal 100,000 Ground Storage Yard No. 2 gal 200,000 Ground Storage Aker St. gal 300,000 Ground Storage Cowling Rd. gal 500,000 Total Ground Storage Capacity gal 1,200,000 Elevated Storage Walmart gal 500,000 Elevated Storage McReynolds Rd. gal 200,000 Elevated Tank Acker St. gal 500,000 Total Elevated Storage Capacity gal 1,200,000 Total Storage Capacity gal 2,400,000 Table No. 5 - Minimum Total Storage Capacity shows the storage deficit, if any, over time as the City grows at a 4% annual growth rate assuming 200 gallons per connection. Table No. 5 - Minimum Total Storage Capacity Connections Year TCEQ Required Storage (gal) Storage Available (gal) Storage Surplus (gal) 2,830 2017 566,000 2,400,000 1,834,000 2,943 2018 588,640 2,400,000 1,811,360 3,061 2019 612,186 2,400,000 1,787,814 3,183 2020 636,673 2,400,000 1,763,327 3,311 2021 662,140 2,400,000 1,737,860 3,443 2022 688,626 2,400,000 1,711,374 3,581 2023 716,171 2,400,000 1,683,829 3,724 2024 744,817 2,400,000 1,655,183 3,873 2025 774,610 2,400,000 1,625,390 4,028 2026 805,594 2,400,000 1,594,406 4,189 2027 837,818 2,400,000 1,562,182 4,357 2028 871,331 2,400,000 1,528,669 4,531 2029 906,184 2,400,000 1,493,816 4,712 2030 942,432 2,400,000 1,457,568 Through the year 2030, the City has sufficient storage capacity and can meet TCEQ regulations on minimum required storage capacity. City of Sanger Water and Wastewater Capital Improvements Plan Page 7 2.3 EXISTING ELEVATED STORAGE TANK INFORMATION As shown in Table No. 4, the City has 1.2 million gallons of elevated storage, serving approximately 2,830 connections. Table No. 6 - Minimum Elevated Storage Capacity shows when the City can expect to fall below the minimum requirement of 200 gallons per connection as growth occurs at the estimated 4% growth rate. It is not expected that the City will reach this point by the year 2030. However, as the City approaches this point, planning for additional storage and/or high service pumping may be required to continue meeting the requirements set forth by the TCEQ. Table No. 6 - Minimum Elevated Storage Capacity Connections* Year TCEQ Required Storage (gal) ** Storage Available (gal) Storage Surplus(gal) 2,830 2017 566,000 1,200,000 634,000 2,943 2018 588,640 1,200,000 611,360 3,061 2019 612,186 1,200,000 587,814 3,183 2020 636,673 1,200,000 563,327 3,311 2021 662,140 1,200,000 537,860 3,443 2022 688,626 1,200,000 511,374 3,581 2023 716,171 1,200,000 483,829 3,724 2024 744,817 1,200,000 455,183 3,873 2025 774,610 1,200,000 425,390 4,028 2026 805,594 1,200,000 394,406 4,189 2027 837,818 1,200,000 362,182 4,357 2028 871,331 1,200,000 328,669 4,531 2029 906,184 1,200,000 293,816 4,712 2030 942,432 1,200,000 257,568 * 4% growth rate ** 200 gallons per connection of storage 2.4 EXISTING PUMPING INFORMATION The City currently has five (5) ground storage tanks totaling 1.2 million gallons and three (3) elevated tanks totaling 1.2 million gallons. Water is pumped into the distribution system via booster pumps at the various ground storage tank locations shown in Exhibit 01. The City's elevated storage tanks have three (3) distinct overflow elevations that produce three different pressure planes within the system when each tank is filled to overflow. As discussed in the 2014 Technical Memorandum, the City currently manages at "tank full" levels in order to keep the lower elevation tanks from overflowing. The "control tank" for the system is the Acker Street Tank. The City's well pumps come on automatically via SCADA when the ground storage tanks fall to the lower set point programmed for each location. The well pumps shut off when the ground storage tank reaches the upper set point programmed in SCADA. When the elevated storage tanks fall to their lower set point, the booster pumps are programmed to come on and pump water out of the ground storage tank to fill the elevated storage tank to the upper set point, at which time the booster pumps shut off. If water demand is great City of Sanger Water and Wastewater Capital Improvements Plan Page 8 enough this can all be happening simultaneously. Elevated storage tanks are filled by the booster pumps and then lower storage tanks via gravity. The total pumping capacity of the City's system is 2,500 gallons per minute (GPM). Table No. 7 - Pump Capacity shows the maximum connections that can be served by the high service pumping capacity at both 0.6 and 2.0 gallons per minute (GPM) per connection. Table No. 7 - Pump Capacity ITEM UNITS CAPACITY CONNECTIONS (0.6 GPM) CONNECTIONS (2.0 GPM) HSP (2) Cowling Rd. GPM 700 1,167 350 HSP (1) Yard GPM 300 500 150 HSP (2) Acker St. GPM 600 1,000 300 HSP (3) Utility Rd GPM 900 1,500 450 Total HSP Capacity GPM 2,500 4,167 1250 Table No. 8 - Minimum Pumping Capacity shows when the City can expect to fall below the minimum requirement of 0.6 gallons per minute (GPM) per connection as growth occurs at the estimated 4% growth rate. It is shown that the pumping capacity is adequate until the year 2027, in which planning for additional high service pumping and/or storage will be required to meet TCEQ minimum requirements. Table No. 8 - Minimum Pumping Capacity Connections* Year TCEQ Required Pumping (gpm ** Pumping Available (gpm) Pumping Surplus (gpm) 2,830 2017 1,698 2,500 802 2,943 2018 1,766 2,500 734 3,061 2019 1,837 2,500 663 3,183 2020 1,910 2,500 590 3,311 2021 1,986 2,500 514 3,443 2022 2,066 2,500 434 3,581 2023 2,149 2,500 351 3,724 2024 2,234 2,500 266 3,873 2025 2,324 2,500 176 4,028 2026 2,417 2,500 83 4,189 2027 2,513 2,500 (13) 4,357 2028 2,614 2,500 (114) 4,531 2029 2,719 2,500 (219) 4,712 2030 2,827 2,500 (327) * 4% growth rate ** 0.6 gallons per minute per connection 2.5 RECOMMENDATIONS FOR THE WATER SUPPLY IMPROVEMENTS Based on the 4% growth rate and the current water supply produced by the City, additional water supply sources are not needed immediately. The City's water supply capacity is projected to become deficient in the years following 2027, based on the 4% growth rate and City of Sanger Water and Wastewater Capital Improvements Plan Page 9 anticipated increase in connections. The high service pumping capacity is also expected to become deficient before the year 2030, as shown in Table No. 8. It should be noted that the existing high service pump capacity at the Yard Pump Station does not meet minimum TCEQ requirements and needs to be improved as soon as funds are available. The required pumping capacity was determined by TCEQ regulations, and will require planning for either additional high service pumping and/or storage capacity by the year 2027. Recommendations and estimates for the water supply improvements are discussed in the following subsections, and the water distribution system improvements are discussed in Section 3.0 of this report. 2.5.1 2023 WATER SUPPLY IMPROVEMENTS The 2023 recommended improvements include those previously recommended in the 2010 Master Plan that have not already been implemented. Exhibit 02 shows the 2023 water system improvements for both supply and distribution. The proposed water supply improvements for 2023 are as follows: Upgrade the high -service pumping capacity at the Cowling Road Plant from 700 GPM to 1,000 GPM. Replace the single 300 GPM high -service pump at the Yard Plant with two 600 GPM high -service pumps. Alternatively, the City may add two (2) 700 GPM high service pumps, and eliminate the need of increasing the Cowling Road Plant to 1,000 GPM. Re-evaluate population data and historic meter use data for planning purposes 2.5.2 2030 WATER SUPPLY IMPROVEMENTS The 2030 recommended water supply improvements are shown on Exhibit 03. These improvements are as follows: • Construct new well, ground storage tank, and a booster station facility east of town at the junction of FM 455 and Union Hill Road. If well supply is not available or not granted through the Groundwater District, the additional supply may be obtained through the UTRWD. 2.5.3 SUMMARY As previously mentioned, additional water supply sources are not needed immediately based on a 4% growth rate. However, the 20230 improvements do recommend an additional well supply, or increase in the purchased water supply, in the event that one of the existing wells needs to be taken offline or fails. Additionally, the Yard Pump Station does not meet TCEQ minimum standard, and by 2027 the City's pump capacity becomes deficient. The addition of two (2) 600 gallon per minute (GPM) high service pumps will allow sufficient pumping and meet TCEQ minimum standards. As an alternative option, the City may add two (2) 700 GPM high service pumps, and eliminate the need of increasing the Cowling Road Plant to 1,000 GPM. City of Sanger Water and Wastewater Capital Improvements Plan Page 10 Section 3.0 - WATER DISTRIBUTION SYSTEM 3.1 EXISTING WATER DISTRIBUTION SYSTEM The City of Sanger provides water service to its 2,830 (+/-) via 62.3 miles of distribution piping consisting of approximately .23 miles of 20", 1.4 miles of 16", 8.5 miles of 12", 20.3 miles of 8", 15.6 miles of 6", 0.76 miles of 4" and 15.6 miles of 2". The existing water distribution system is shown in Exhibit 01. 3.2 ANALYSIS OF EXISTING SYSTEM As previously stated, the City's service area is located within the City limits, and includes the Wal-Mart Distribution Center and several subdivisions. However, there are areas within the City limits that do not currently have service from the City of Sanger. These areas have been historically served by Bolivar Water Supply. The area with limited distribution lines north of Belz Road, along 1-35, is shown in Figure 1. As mentioned these areas, west of 1-35 and north of Lois Road, are serviced by Bolivar Water Supply due to these limitations. The system is also currently unable to serve the populations shown in Figure 2, that are east of Marion Road and north of FM455/West Chapman Road or those east of Lake Ridge Estates. Existing populations shown in Figure 3, west of Metz and north of Belz Road, also do not have distribution lines providing service. As the City continues to grow and develop these areas, distribution lines are needed to serve both present and future populations within the City limits. Figure 1— Mobile Home Park not serviced Figure 2 — Area east of Marion and east of Lake Ridge by distribution lines Estates not serviced by distribution lines City of Sanger Water and Wastewater Capital Improvements Plan Page 11 Figure 3 — Area west of Metz and North of Belz Road not serviced by distribution lines The City of Sanger's water distribution system is currently in compliance with the TCEQ regulations for supply and capacity with the current number of connections being served. As the City's population grows, upgrades to pipe lines will be needed to handle higher flow demands due to population increases. The areas mentioned with limited or no distribution lines, are the areas in which population growth is expected to occur within the city limits. The only deficiencies found with the current distribution system is the inability to handle fire flow demands in certain areas. 3.3 PROPOSED DISTRIBUTION SYSTEM IMPROVEMENTS ANALYSIS An evaluation of the City of Sanger's existing distribution system's aptitude to meet estimated future demand was performed using PIPE-FLO®, a fluid flow analysis and design modeling software tool. PIPE-FLO® uses nodes and pipes drawn using the existing utility maps to define the water system. Information for the model was developed in conjunction with the estimated future growth and the increased number of connections provided by the City. Pipes were assigned designed characteristics which consider type and estimated overall condition, as described by City staff. Once the model of the existing system was completed, PECI looked at any inadequate areas of flow as well as future areas of expansion to determine the projects listed in this report. The computerized PIPE-FLO° model calculates friction losses and pressures throughout the distribution system from the input of pipe sizes, pipe materials, City of Sanger Water and Wastewater Capital Improvements Plan Page 12 pipe roughness, ground elevations, demands and pump stations operating pressures. The fire flow analysis was conducted by increasing demands to 1,000 (GPM), progressively, throughout the distribution system while monitoring each node. If the pressure drops below 20 psi, or the node is incapable of delivering 1,000 (GPM) of flow in addition to the existing demand, the node fails. The primary cause for deficiencies, demonstrated by node failure, is undersized pipes in the distribution system. The proposed improvements in 2023 and 2030 effectively address the areas in which fire flow deficiencies were found. 3.3.1 FUTURE DEMAND ANALYSIS The City of Sanger, as previously stated, is currently in compliance with the TCEQ regulations on supply and capacity for their current number of connections being served. Once the City begins adding additional distribution lines, to serve the existing populations not currently served and future populations due to development, installation of new lines and upgrades to existing lines are needed to ensure that older, existing pipes do not hinder the system's ability to handle higher demands during fire flow. The proposed distribution system improvements are discussed in Sections 3.4 and 3.5 of this report. 3.4 2023 PROPOSED DISTRIBUTION SYSTEM IMPROVEMENTS The PIPE-FLO® model was used, in addition to direct feedback from the City's staff on areas that have insufficient sizing and/or maintenance issues that occur regularly, to determine the distribution improvements needed by 2023 associated with expanding the City's water distribution system to cover areas of anticipated growth and address fire flow deficiencies. The improvements for 2023 are as follows, with higher priority items listed first: • FM455 expansion, all utilities adjacent shall be relocated • 8" line along Plum St between 10th and 2"1 street (High priority with planned widening of FM455) • 8" line along Railroad Ave (From Willow St South to existing 6") • 12" line along Willow St (From Railroad Ave to Well #6.) • 6" line along S. Jones St (From Willow St, south) • 6" line along Simms St (From Willow St, south) • 6" line along Jennifer (end of existing line to Belz) • 12" line along 1-35 East Service Road (Utility to Lois) • 8" line along Belz to Metz then South along Metz to Chapman • 8" line along Huling (RR to Marion) • 12" line along Marion (connects to Huling line and creates service loop) • 12" line along McReynolds (Lake Ridge to Union Hill area) • 12" line along FM 455 (Marion to Union Hill) • 8" line along future Union Hill (FM 455 to McReynolds) • Upgrade Yard Plant (increase pumping capacity to 1200 GPM with the addition of two (2) 600 GPM pumps) City of Sanger Water and Wastewater Capital Improvements Plan Page 13 Increasing the pumping capacity at the Cowling Road and Yard Plants will facilitate increasing the water supply from UTRWD and provide adequate pumping capacity at the plants. The proposed improvements are outlined in Exhibit 07 — Preliminary Opinion of Probable Construction Cost and shown in Exhibit 02 — 2023 Water Distribution System Improvements Map. 3.5 2030 WATER DISTRIBUTION SYSTEM IMPROVEMENTS The PIPE-FLO® model was used to determine the distribution improvements needed by 2030 associated with expanding the City's water distribution system to cover areas of anticipated growth. The 2030 improvements for expansion are as follows: • 12" line along FM455 (East of Union Hill) • 12" along 1-35 West Service Rd (North from 1-35 crossing to View) • 12" line along McReynolds (East of future Union Hill Road) • 12" line along FM 2164 (finish loop) • 8" line along Union Hill (North of FM 455 and along Lake) • 12" line along FM 1190 • 12" line along Lois (RR to Marion) • 12" line along Marion (Lois to Huling) • 12" line along 1-35 East Service Rd. (View to Chisum) • 8" line along Chisum (1-35 East Service Rd to RR) • 8" line along RR (Walmart to Chisum) • 8" line along View to Metz, South on Metz to Belz • Additional water well for industrial use on Lois, west of 1-35 • Supply Facility at McReynolds and Union Hill (well, tank, pumps) The supply facility at McReynolds and Union will allow for an additional groundwater well to increase water supply. This option is recommended in the event that the City continues to grow to the east faster than the rate shown in this study. The proposed improvements are outlined in Exhibit 07 — Preliminary Opinion of Probable Construction Cost and shown in Exhibit 03 — 2030 Water Distribution System Improvements Map. 3.6 SUMMARY Projected population growth based on NCTCOG and connection estimates show that the City of Sanger will need additional distribution lines to serve its growing populations. Upgrading of smaller diameter pipes is essential for handling higher flows during fire flow, and in some cases, is needed for day-to-day flow demands. The proposed improvements from 2023 to 2030 focus on serving the growing population and addressing piping deficiencies at higher flow demands. City of Sanger Water and Wastewater Capital Improvements Plan Page 14 Section 4.0 - SANITARY SEWER COLLECTION SYSTEM 4.1 EXISTING COLLECTION SYSTEM The City of Sanger currently provides sanitary sewer services to most of the customer base within the Sanger city limits. Previous City collection system maps and newly installed collection system addition maps were used to measure the 40.2 miles of collection system piping consisting of approximately 15.8 miles of 6", 14.6 miles of 8", 1.6 miles of 10", 0.95 miles of 12", 2.3 miles of 15", 1.3 miles of 18", 2.1 miles of 21", and 0.4 miles of 27", 0.3 miles of 4" force main, 0.54 miles of 6" force main, and 0.43 miles of 8" force main. The existing collection system is shown in Exhibit 04 and the facilities are outlined below: The City currently has six (6) lift stations of varying sizes and capacities using submersible pumps. When the last Water and Wastewater Master Plan was updated in 2010, the City had a modified manhole acting as a "temporary lift station" behind Miguelitos, located at 1412 N. Stemmons Street. A new 21" sewer line is currently being installed in this location, and the modified manhole will be removed. According to City staff, all lift stations are in good condition, except for the South Bottom Lift Station, also referred to as the Cowling Lower Lift Station. The Cowling Lower Lift Station is already scheduled to be relocated and redesigned. The City currently owns and operates its own wastewater treatment plant (WWTP) which consists of four (4) packaged treatment plants that are operated in parallel, an equalization basin, headworks with step -screen, four (4) sludge drying beds and a water reclamation pond. The WWTP is currently under construction to upgrade and expand its capabilities. These improvements will change the permitted capacity from 0.98 million gallons per day (MGD) to 1.6 million gallons per day (MGD). The location of the WWTP and the lift stations are shown in Exhibit 04. 4.2 ANALYSIS OF EXISTING COLLECTION SYSTEM Design requirements of a gravity wastewater collection system from the current Texas Commission on Environmental Quality (TCEQ) regulations under Chapter 30 of the Texas Administrative Code (TAC) 217 was referred to in order to evaluate the existing sanitary sewer collection system. The regulations state the following: An owner must design a wastewater collection system to handle the transport of the peak dry weather flow from the service area, plus infiltration and inflow. The flow calculations must include the details of the average dry weather flow, the dry weather flow peaking hour, and the infiltration and inflow. Improvements needed for the collection system were based on staff comments and feedback. Much of this feedback concerned sewer lines that are insufficiently sized for the amount of growth the City has experienced over the past five years. Additional improvements are needed for line segments that are experiencing excessive maintenance issues. It should be City of Sanger Water and Wastewater Capital Improvements Plan Page 15 noted that no hydraulic analysis was performed on the existing and proposed collection system. 4.3 2023 COLLECTION SYSTEM IMPROVEMENTS The 2023 improvements involve expanding the City's service area. Currently the Cowling Lower Lift Station is being taken out of service and the influent to the abandoned lift station will be directed to a new 21" gravity line to proposed lift station and then to the existing WWTP via a 15" force main. The proposed 2023 improvements are as follows: • 6" line along Plum St. • 8" line along Plum St. • 6" line on Bolivar from service road to 5t" St. • 6" line in alley just south of Bolivar from 5th to 2nd St. • 8" line from Railroad Ave to Jones, south of E Willow St. • 27" line (to replace 15" trunk line North of McReynolds) • 8" line North of Chapman to Belz • 15" line along creek (Lake Ridge LS to FM 455) • Proposed lift station off Marion Street with 1000 gpm pumping capacity • 15" line from FM 455 to proposed lift station off Marion Street. • New McReynolds Lift Station with 2000 gallons per minute (GPM) pumping capacity (upgradeable) • 21" line (North of McReynolds from proposed McReynolds Lift Station) • 10" force main along McReynolds to Lake Ridge • Railroad and Rector Lift Station with 1000 gallons per minute (GPM) pumping capacity • 15" force main from proposed Railroad and Rector Lift Station to existing WWTP • 21" line from N. Lois to View Rd. • 12" line along FM 455 from Railroad to Acker St. • 15" gravity line from existing 18" at abandon Cowling Rd. Lift Station to proposed lift station on Railroad at Rector • 15" gravity line from existing WWTP to the new discharge site The 27" line that replaces the 15" trunk line north of McReynolds is necessary to accommodate future residential and commercial growth in the northern part of the City. The proposed improvements are outlined in Exhibit 07 — Preliminary Opinion of Probable Construction Cost and shown in Exhibit 05 — 2023 Collection System Improvements Map. 4.4 2030 COLLECTION SYSTEM IMPROVEMENTS The 2030 improvements extend the City's sewer services out to the full extent of the City's limits. The 2030 improvements are as follows: City of Sanger Water and Wastewater Capital Improvements Plan Page 16 • 15" gravity line (extend service on West Side of 1-35) • 18" gravity line from removed Duck Creek LS to existing 18" gravity line that crosses 1-35 • 12" gravity line from 21" sewer off 1-35 and Lois, to west city limits to serve North Chisum area • Upgrade 2023 proposed McReynolds Lift Station from 2000 gpm to 3000 gpm. • 15" gravity line to extend service further into Union Hill towards FM 455 • 21" force main from proposed lift station to existing WWTP • 36" gravity line from existing WWTP to the new discharge site • 21" gravity line from Lake Ridge Lift Station to existing WWTP • Lift station to serve North Chisum area with 1000 gpm pumping capacity • 6" force main between lift stations in Chisum area, not shown on map The proposed improvements would reduce O&M costs with the removal of the Duck Creek Lift Station from service. In place of the Duck Creek Lift Station, the 8" line running along Keaton would connect to the proposed 18" gravity line that crosses 1-35. Additionally, in place of the Lake Ridge Lift Station, the 21" line will be used to convey wastewater to the existing WWTP. The proposed improvements are outlined in Exhibit 07 — Preliminary Opinion of Probable Construction Cost and shown in Exhibit 06 — 2030 Collection System Improvements Map. 4.5 SUMMARY The proposed collection system improvements include planned connections to a future Regional WWTP, removing or upgrading lift stations, collection system capacity improvements, repairs/replacement of failing lines and extending sewer services to areas of proposed development. The improvements currently underway, as part of the previous Capital Improvements Plan for the year 2020, include the removal of the Cowling Lift Station and the removal of the lift station behind Miguelitos. Proposed major improvements for the years 2023 through 2030 include removal of the Duck Creek Lift Station, the Lake Ridge Lift Station, and the installation of the lift stations off Marion Road and in the North Chisum area. The collection system will later be expanded to provide services to the large undeveloped areas to the north and east of the City. Section 5.0 - IMPACT FEE ANALYSIS 5.1 GENERAL The impact fee analysis was conducted using the NCTCOG population estimates and growth rate, as well as the future land use information provided by the City. Chapter 395 of the Local Government Code was referred to for guidelines on financing capital improvements that are required to support new development in municipalities, counties and other local governments. The Local Government Code allows the maximum impact fee to be charged if revenues from future ad valorem taxes and water and sewer bills are included as credit in the City of Sanger Water and Wastewater Capital Improvements Plan Page 17 analysis. When future revenues are not accounted for during impact fee analysis, the maximum impact fee can be assessed as 50% of the calculated maximum fee. For the purpose of this report, future revenues and ad valorem taxes are not accounted for and the impact fee is assessed as 50% of the calculated maximum fee as shown in Section 5.2. The following items were accounted for in the impact fee calculation: • Estimated cost of water supply improvements • Estimated cost of water system improvements • Estimated cost of collection system improvements • NCTCOG population projections 5.2 ANALYSIS METHOLOGY AND SUMMARY The total cost of each improvement required to provide the needed water and sewer services to the extents of the City's future development and to address deficiencies within the water and sewer systems were estimated in Exhibit 07 — Preliminary Opinion of Probable Construction Cost. The estimated cost for 2023 and 2030 water system improvements are approximately $13,158,400 and $16,689,600, respectively. The estimated cost for 2023 and 2030 sanitary sewer improvements are approximately $18,737,600 and $12,801,600, respectively. The total sum of $61,387,200 for both the water and sanitary sewer improvements through the year 2030 were then divided by the total number of projected connects, in order to get the impact fee on a per connection cost for all improvements through the year 2030. Combined Impact Fee = Total Cost of Water Improvements + Total Cost of Sewer Improvements Total Number of Projected Connections Combined Impact Fee = $13,158,400 + $16,689,600 + $18,737,600 + $12,801,600 2,830 = $21,692 Maximum Combined Impact Fee = 0.50(Impact Fee) Maximum Combined Impact Fee = 0.50($21,692) _ $10,846 per connection Distribution Impact Fee = Total Cost of Water Improvements Total Number of Projected Connections $13,158,400 + $16,689,600 2,830 _ $10,547 City of Sanger Water and Wastewater Capital Improvements Plan Page 18 Maximum Distribution Impact Fee = 0.50($10,547) _ $5,273 per connection Sewer Impact Fee = Total Cost of Sewer Improvements _ $18,737,600 + $12,801,600 Total Number of Projected Connections 2,830 = $11,145 Maximum Sewer Impact Fee = 0.50($11,145) _ $5,572 per connection The calculated initial combined impact fee is approximately $21,692 per connection and 50% of this fee is approximately $10,846 per connection, which is the final maximum fee for both water distribution and sewer improvements in accordance with Chapter 395 of the Local Government Code. A summary of the overall costs and a breakdown of line item costs can be found in Exhibit 07 — Preliminary Opinion of Probable Construction Cost. Y U cl EXISTWG 01 MG EST EI(SUIXG UTERYROA) PLAR WELL n SO MG G$T AMU" ST STI COMA MROADPL.UR UPPFRTM SUPPLY 01 MG GST EXHIBIT 01 WATER AND WASTEWATER CAPITAL IMPROVEMENTS 2017 EXISTING WATER SYSTEM 1(9� GR,APM SCALE 1�w Iw 0 ton Ip0 SMffA ESTAiE3 WELLOS LEGEND ••••••.•• SWATFR LINE a; LF ............ VWATERLIRE ♦.WO LF �.......� CWATERLRE SUSS LF .......... rwATERLOE 101Mm 1TWATERLHE 41b LF 16w..LYE ?m LF 2YWATERLVE IXti LF Aq WIOROALLORS EST EUNATEDSTOR ,`W GST GROUDSTORAGETW PERKINS ENGINEERING CONSULTANTS,INC. REGSMATOR X6-!b» DECEMBER 04, 2017 =r��� Ilill ■ 1-1 -Fees ICE FM 455 ■III■' a to �GiiGi1ei= ■ , �'r ... Uri uutO-f = 1't 111tifl15�,, 1 1 2 ii�>�r:,:i. ^-MIS (ILLS ,� �j p�I L� L •o�nu. _s � I ��� • • C� +�0/.3PN�'•��iyyY �g�pM��y�RL �� -_ 73.9l14 S•i1•�•!a a_c _ 111eijg �`iJ'•�i� . .ZI fi� seen molaw psi 0 rL' a a= o���l ]� P } ! LEI` p(-It•=��ME a ELmll� •t Tt7 —+7j1 — ]�' = I sm %'.» a .. MENga $ Ti f €n u-�C��1� �_•e"'� �";F g� •ntuuuuii ! }LEGEND MN? IS EXHIBIT 02 i 2023 PROPOSED * TEXAS WATER D WASTEWATER CAPITAL IMPROVEMENTS IMPROVEMENTSWATER SYSTEM t O WY�W'al +r—, WI N EXHIBIT 03 WATER AND WASTEWATER CAPITAL IMPROVEMENTS 2030 PROPOSED WATER SYSTEM IMPROVEMENTS WaIaWY 6'u_±r Ur £I ......••• rWATERIBIE U v ............ {'WAiFRLNE 0 LF ......... VWAiER U v �..�..�..� 9'WAiERLNE 51,?51 LF lr WAi ME U,,= V IEWAt ME a LF aft —WE a PERKINS 0 ENGINEERING CONSULTANTS,INC, rsE aeaSmAtt. - r- 11 DECEMBER 04, 2017 LEGEND _......._ 6se,.s 60110 LF. 6'— RM LF. ........... 1,*= 65ro U. ❑ llm ......... 12'se.er SA00 LF. - - ' _ _ , kmp Ib20 LF. - -- - - ISsexs 12)m L.F. �- -- - 6'bro,mYn 'AM LF. ______-r 6A70 U. - 8k-o ZM LF. 21'aeaw 11.000 LF. fayuru .�.�.� 2T 010 LF. Y C) O G m� BELZ BELZ u_ I� Y n O p W/il"I'll II �- ABANDONED LIFT RD. 4�- GP.VW SCALE i4V iii 100 0 600 16M EXHIBIT 04 PERKINS WATER AND WASTEWATER CAPITAL IMPROVEMENTS 0 ENGINEERING 2017 EXISTING CONSULTAN73,INC. COLLECTION SYSTEM OECEMBER04,2017 LEGEND _....... _ 6-- 5,760 LF. • drva _.. a.— e.aaa LF. o ■■tc■ ......... 12'— 3,910 LF. a'Fmxm 0 LF. :Suva 5,1 LF. ��.���6'bmman 0LF. ------- tr :2,293 LF. 0'bm Ran 0 LF. 21'u�a 6;i90 LF. 1(1*1— n 52d3 LF. 2T_ 3.165 U. Cry L" —.�.�.� 06 — 6,465 LF. G.. AMC SCALE IOCO o 1w) M II ! u:^m1�n1Lq■L �t �•! r� : iFM 455 �I dULam � �yue�13,i' ,m; 'A ■Fy- woos i�.i 1171;i'�i ,i`'�, _ v'_�,-'a'mur'► ifs-�1 i . a ■ : 'msea,iME - - LIFT STATION will. ill. �■tea ' tn� nt ° ��Sl��es =tiyili mull! 1 1�S■1 ■. r_�� , ■ Ul pxtmnnn a 1 SIEG�i-r�tw�� `7i i.i i d it Ci���� � �n � `' L�.� a1 6 •. aL L nLL `Icy s ■� :L LAKE RIDGELIFT -a, ae�'J_.■■3 a�� STATION ggngg■L 1s FA Towww 21' FR011 A6ua10.vE0 CO'ALOIGRD LIFT STATIONTGLOSTATIM POSE0 IIFTSfAT10N EXHIBIT 05 PERKINS WATER AND WASTEWATER CAPITAL IMPROVEMENTS ENGINEERING A coNS 2023 PROPOSED ULr--.. 3N¢ Acc LT N S INc, COLLECTION SYSTEM DECEA10ER04,2017 11(9� G WRC6 ALE 1=15W fkV 0 15M m 1 .. F YtlE11101lA4 lFT 57AipN �'/� II 11 \ LEGEND �.._....� 6'x.v 0 LF. • 2emM LF. � 6tftatbn 2 ._....... 12'xaer 9.)d3 U. --,�.� 4'bm 0 U. 9S27 LF. 0 LF. ........... 16'x�e 6.765 LF. ��.�� 6'f.-- 0 LF. 21'— 10,W LF. 10'bm 0 LF- ....... 27— 0 U. Gfjl ------- 36— 6.465 LF. EXHIBIT 06 PERKINS WATER AND WASTEWATER CAPITAL IMPROVEMENTS 0 ENGINEERING COSULiA N 2030 PROPOSED "'.SINC, E STlW N6 OECEMBER04,2017 COLLECTION SYSTEM 0 PERKINS ENGINEERING CONSULTANTS, INC. EXHIBIT 07 CITY OF SANGER CAPITAL IMPROVEMENTS MASTER PLAN OPINION OF PROBABLE CONSTRUCTION COST 2023 WATER SYSTEM IMPROVEMENTS DESCRIPTION COST 2023 WATER SYSTEM IMPROVEMENTS Subtotal $8,224,000 Mobilization $411,200 Contractor OH&P $1,233,600 Engineering $1,233,600 Contingency $2,056,000 Grand Total $13,158,400 2030 WATER SYSTEM IMPROVEMENTS DESCRIPTION COST 2030 WATER SYSTEM IMPROVEMENTS Subtotal $10,431,000 Mobilization $521,550 Contractor OH&P $1,564,650 Engineering $1,564,650 Contingency $2,607,750 Grand Total $16,689,600 2023 SANITARY SEWER IMPROVEMEMNTS DESCRIPTION COST 2023 SANITARY SEWER SYSTEM IMPROVEMENTS Subtotal $11,711,000 Mobilization $585,550 Contractor OH&P $1,756,650 Engineering $1,756,650 Contingency $2,927,750 Grand Total $18,737,600 Perkins Engineering Consultants, Inc. TBPE Firm No. 8699 Page 1 of 2 5/31/2018 0 PERKINS ENGINEERING CONSULTANTS,INC. CITY OF SANGER CAPITAL IMPROVEMENTS MASTER PLAN OPINION OF PROBABLE CONSTRUCTION COST 2023 WATER SYSTEM IMPROVEMENTS DESCRIPTION COST 2030 SANITARY SEWER IMPROVEMENTS DESCRIPTION COST 2030 SANITARY SEWER SYSTEM IMPROVEMENTS Subtotal $8,001,000 Mobilization $400,050 Contractor OH&P $1,200,150 Engineering $1,200,150 Contingency $2,000,250 Grand Total $12,801,600 COMBINED WATER AND SANITARY IMPROVEMENTS DESCRIPTION COST 2023 WATER SYSTEM IMPROVEMENTS $13,158,400 2030 WATER SYSTEM IMPROVEMENTS $16,689,600 2023 SANITARY SEWER SYSTEM IMPROVEMENTS $18,737,600 2030 SANITARY SEWER SYSTEM IMPROVEMENTS $12,801,600 Grand Total of ALL Improvements $61,387,200 Impact fee = $21,691.59 50% = $10,846 Perkins Engineering Consultants, Inc. TBPE Firm No. 8699 Page 2 of 2 5/31/2018 BANGER *TEXAS COUNCIL AGENDA ITEM AGENDA TYPE ❑ Regular ❑ Special ❑ Consent Reviewed by Finance ❑ Yes ® Not Applicable ® Workshop ❑ Executive ❑ Public Hearing Reviewed by Legal ❑ Yes ® Not Applicable Council Meeting Date: June 4, 2018 Submitted By: Jim Berman, Director Parks and Recreation City Manager Reviewed/Approval Initials -L Date OJ 3 0 ACTION REQUESTED: ❑ORDINANCE ❑ RESOLUTION ❑ APPROVAL ❑ CHANGE ORDER ❑ AGREEMENT ❑ APPROVAL OF BID ❑ AWARD OF CONTRACT ❑ CONSENSUS ❑ REAPPOINTMENTS AGENDA CAPTION Presentation by Tatum Whitewood for a proposed events pavilion located at John Porter Sports Complex. FINANCIAL SUMMARY ❑N/A ❑GRANT FUNDS []OPERATING EXPENSE ❑REVENUE ❑CI P ❑BUDGETED ❑NON -BUDGETED FISCAL YEAR: PRIOR YEAR CURRENT YEAR FUTURE YEARS TOTALS Proposed Ex enditure Amount Encumbered Amount BALANCE FUND(S) TO BE USED: General ❑$ Utility ❑ $ Special ❑ $ BACKGROUND/SUMMARY OF ITEM Tatum Whitewood is a Ford Scholar recipient that is interested in completing a community service project. She presented her project to the Sanger Texas Development Corporation on February 27, 2017 and received their support for the project. She is spearheading this events pavilion project for John Porter Sports Complex. STAFF OPTIONS & RECOMMENDATION List of Supporting Documents/Exhibits Attached: Prior Action/Review by Council, Boards, Commissions or Other Power Point Presentation Agencies: Rendering of the project Site Plan for the project Sanger Texas Development Corporation approved project April 17, 2018 M C!� CJ� C� ® ° • Cp rn C!� CIS C!� C1� ° 0 c V cu cu • • �i w v J VJ • 0 +�+ ;-4 00 X `` CC$ CJ > � 4� a� UO ® , j o ' N u °o cry un w U cn P4 wd .�w .m=u rya m3 e�a Y. I n. r W co m r� cn Xz V � X� U)O FU w W z O r m w O O U 111 N O z �e U aJ LO O N CD M m +, q M N N •� C) O O p O bC ;:5 O Uj '� O ,� � c� t -� O t�] -Q) +' 4-1 ® � O U u -N ,� b-0 u u 4-1 �+ u F4 CAI O bG- N r p� ® �-+ VJ -- C) 4-5® O � U C!� UO . v Qv Z= 469�` . � •; ram► .,a ,. C a'��'+1 j '�(y�, 4 a � : ji�� � ,~' -t! CO) rF 1i . + •��, ► _ - fir, Q'+w 1�t kA '�"w .d 1. - �i'►� Ri. `.. `,`-�ii , `� ` �.4.e' .t.'YL'.— ' rT i '1 �' ,• " 'fi•:.� S ':1 1•• IF .�w �. '�,��/• f't� � 'q:y�r � i':J�:t� ��5 �, 1 •�1��L1,- F. .SLi�j�r1�► y, r . t�•+:� 2•'.� itii . s i" lt� iC «,' c � I a r�•a yea. \./ >•h', r � t+ • r s^�a' r � Z.� � • \pia • f (� +r't! :. 1• c 16 47 INN r •,^�..-�_ .- 1i'�.� mot- + J