Loading...
03/06/2023-CC-Agenda Packet-RegularCITY COUNCIL MEETING AGENDA MARCH 06, 2023, 6:00 PM CITY COUNCIL REGULAR MEETING HISTORIC CHURCH BUILDING - 403 N 7TH STREET, SANGER, TEXAS CALL THE WORK SESSION TO ORDER AND ESTABLISH A QUORUM EXECUTIVE SESSION Pursuant to the Open Meetings Act, Chapter 551, the City Council Will Meet in a Closed Executive Session in Accordance with the Texas Government Code: Section 551.072. DELIBERATION REGARDING REAL PROPERTY A. For deliberations regarding the purchase, exchange, lease, or value of real property if deliberation in an open meeting would have a detrimental effect on the position of the governmental body in negotiations with a third person specifically, Michael Riley, Laura Riley, and J. Mike Riley Ranch Properties, LLC, (collectively the "Owner"). B. For deliberations regarding the purchase, exchange, lease, or value of real property if deliberation in an open meeting would have a detrimental effect on the position of the governmental body in negotiations with a third person specifically, 201 Bolivar Street, Sanger, Texas 76266. RECONVENE INTO WORK SESSION Reconvene into the Work Session. Any necessary action will be taken during the Regular Session. OVERVIEW OF ITEMS ON THE REGULAR AGENDA ADJOURN THE WORK SESSION The Regular Meeting will begin following the Work Session but not earlier than 7:00 p.m. CALL THE REGULAR MEETING TO ORDER AND ESTABLISH A QUORUM INVOCATION AND PLEDGE 1 CITIZENS COMMENTS This is an opportunity for citizens to address the Council on any matter. Comments related to public hearings will be heard when the specific hearing begins. Citizens are allowed 3 minutes to speak. Each speaker must complete the Speaker’s Form and include the topic(s) to be presented. Citizens who wish to address the Council with regard to matters on the agenda will be received at the time the item is considered. The Council is not allowed to converse, deliberate or take action on any matter presented during citizen input. REPORTS Staff Reports are for discussion only. No action may be taken on items listed under this portion of the agenda. 1. Presentation by Kimley-Horn on potential design options for the IH-35 corridor. CONSENT AGENDA All items on the Consent Agenda will be acted upon by one vote without being discussed separately unless requested by a Councilmember to remove the item(s) for additional discussion. Any items removed from the Consent Agenda will be taken up for individual consideration. 2. Consideration and possible action on the minutes from the February 21, 2023, meeting. 3. Consideration and possible action on authorizing staff to issue a Request for Qualifications (RFQ) for professional services to perform a Housing Study. PUBLIC HEARING ITEMS 4. Conduct a public hearing on a request for the Replat of Lot 2, of the IESI Industrial Park, being 2.993 acres located within the City of Sanger, generally located along the north side of Utility Road approximately 1464 feet east of the intersection of North Stemmons Frwy and Utility Road. 5. Conduct a public hearing regarding amending Chapter 13 Utilities, by adding Article 13.2800 Municipal Setting Designation, Sections 13.2801 Definitions, 13.2802 Use of Groundwater in MSD Areas Prohibited, 13.2803 Application for City Council Approval of MSD, 13.2804 Staff Review, 13.2805 Notice of Public Meeting, 13.2806 Public Meeting, 13.2807 City Council Public Hearing, 13.2808 Limitation on Reapplication, and 13.2809 Additional Provisions, Enforcement, and Penalties. ACTION ITEMS 6. Consideration and possible action on a request for the Replat of Lot 2, of the IESI Industrial Park, being 2.993 acres located within the City of Sanger, generally located along the north side of Utility Road approximately 1464 feet east of the intersection of North Stemmons Frwy and Utility Road. 2 7. Consideration and possible action on Ordinance No 03-04-23 amending Chapter 13 Utilities, by adding Article 13.2800 Municipal Setting Designation, Sections 13.2801 Definitions, 13.2802 Use of Groundwater in MSD Areas Prohibited, 13.2803 Application for City Council Approval of MSD, 13.2804 Staff Review, 13.2805 Notice of Public Meeting, 13.2806 Public Meeting, 13.2807 City Council Public Hearing, 13.2808 Limitation on Reapplication, and 13.2809 Additional Provisions, Enforcement, and Penalties. 8. Consideration and possible action on the Final Plat of the Mo Addition, being 38.16 acres, located in the City of Sanger’s ETJ, and generally located on the south side of FM 455, approximately 1961 feet west of the intersection of FM 455 and Creekview Road. 9. Consideration and possible action on the Purchase and Sales Agreement for Lot 2R and 3R, Block A, Sanger Industrial Addition, Lots 1R, 2R & 3R, a Subdivision in Denton, County, Texas. FUTURE AGENDA ITEMS The purpose of this item is to allow the Mayor and Councilmembers to bring forward items they wish to discuss at a future meeting, A Councilmember may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. Items may be placed on a future meeting agenda with a consensus of the Council or at the call of the Mayor. INFORMATIONAL ITEMS Information Items are for informational purposes only. No action may be taken on items listed under this portion of the agenda. 10. Atmos Energy 2022 Interim Rate Adjustment EXECUTIVE SESSION Pursuant to the Open Meetings Act, Chapter 551, the City Council Will Meet in a Closed Executive Session in Accordance with the Texas Government Code: Section 551.072. DELIBERATION REGARDING REAL PROPERTY A. For deliberations regarding the purchase, exchange, lease, or value of real property if deliberation in an open meeting would have a detrimental effect on the position of the governmental body in negotiations with a third person specifically, Michael Riley, Laura Riley, and J. Mike Riley Ranch Properties, LLC, (collectively the "Owner"). B. For deliberations regarding the purchase, exchange, lease, or value of real property if deliberation in an open meeting would have a detrimental effect on the position of the governmental body in negotiations with a third person specifically, 201 Bolivar Street, Sanger, Texas 76266. 3 RECONVENE INTO REGULAR SESSION Reconvene into Regular Session and take any action deemed necessary as a result of Executive Session. ADJOURN NOTE: The City Council reserves the right to adjourn into Executive Session as authorized by Texas Government Code, Section 551.001, et seq. (The Texas Open Meetings Act) on any item on its open meeting agenda in accordance with the Texas Open Meetings Act, including, without limitation Sections 551.071-551.087 of the Texas Open Meetings Act. CERTIFICATION I certify that a copy of this meeting notice was posted on the bulletin board at City Hall that is readily accessible to the general public at all times and was posted on the City of Sanger website on March 1, 2023, at 4:30 PM. /s/Kelly Edwards Kelly Edwards, City Secretary The Historical Church is wheelchair accessible. Request for additional accommodations or sign interpretation or other special assistance for disabled attendees must be requested 48 hours prior to the meeting by contacting the City Secretary’s Office at 940.458.7930. 4 CITY COUNCIL COMMUNICATION DATE: March 6, 2023 FROM: Kelly Edwards, City Secretary AGENDA ITEM: Consideration and possible action on the minutes from the February 21, 2023, meeting. SUMMARY: N/A FISCAL INFORMATION: Budgeted: N/A Amount: $0.00 GL Account: N/A RECOMMENDED MOTION OR ACTION: Approve the minutes from the February 21, 2023, meeting. ATTACHMENTS: 02/21/2023 City Council minutes 5 Item 2. City Council Minutes 02-21-2023 Page 1 of 5 CITY COUNCIL MEETING MINUTES FEBRUARY 21, 2023, 6:00 PM CITY COUNCIL REGULAR MEETING HISTORIC CHURCH BUILDING - 403 N 7TH STREET, SANGER, TEXAS CALL THE WORK SESSION TO ORDER AND ESTABLISH A QUORUM Mayor Muir called the work session to order at 6:00 p.m. COUNCILMEMBERS PRESENT Mayor Thomas Muir Mayor Pro Tem, Place 2 Gary Bilyeu Councilmember, Place 1 Marissa Barrett Councilmember, Place 3 Dennis Dillon Councilmember, Place 4 Allen Chick Councilmember, Place 5 Victor Gann COUNCILMEMBERS ABSENT None STAFF MEMBERS PRESENT: City Manager John Noblitt, Assistant City Manager Alina Ciocan, City Secretary Kelly Edwards, City Attorney Hugh Coleman, Finance Director Clayton Gray, Parks & Recreation Superintendent Ryan Nolting, Director of Human Resources and Special Projects Jeriana Staton, Marketing and Civic Engagement Director Donna Green, and Chief of Police Waylan Rhodes. EXECUTIVE SESSION Pursuant to the Open Meetings Act, Chapter 551, the City Council Will Meet in a Closed Executive Session in Accordance with the Texas Government Code: Section 551.072. DELIBERATION REGARDING REAL PROPERTY For deliberations regarding the purchase, exchange, lease, or value of real property if deliberation in an open meeting would have a detrimental effect on the position of the governmental body in negotiations with a third person specifically, Michael Riley, Laura Riley, and J. Mike Riley Ranch Properties, LLC, (collectively the "Owner"). Council convened into executive session at 6:01 p.m. 6 Item 2. City Council Minutes 02-21-2023 Page 2 of 5 RECONVENE INTO WORK SESSION Council reconvened into work session at 7:09 p.m. No action taken. OVERVIEW OF ITEMS ON THE REGULAR AGENDA No discussion or discussion. ADJOURN THE WORK SESSION There being no further business, Mayor Muir adjourned the work session at 7:10 p.m. CALL THE REGULAR MEETING TO ORDER AND ESTABLISH A QUORUM Mayor Muir called the regular meeting to order at 7:10 p.m. COUNCILMEMBERS PRESENT Mayor Thomas Muir Mayor Pro Tem, Place 2 Gary Bilyeu Councilmember, Place 1 Marissa Barrett Councilmember, Place 3 Dennis Dillon Councilmember, Place 4 Allen Chick Councilmember, Place 5 Victor Gann COUNCILMEMBERS ABSENT None STAFF MEMBERS PRESENT: City Manager John Noblitt, Assistant City Manager Alina Ciocan, City Secretary Kelly Edwards, City Attorney Hugh Coleman, Finance Director Clayton Gray, Director of Development Services Ramie Hammonds, Parks & Recreation Superintendent Ryan Nolting, Director of Human Resources and Special Projects Jeriana Staton, Marketing and Civic Engagement Director Donna Green, Chief of Police Waylan Rhodes, and Director of Public Works Jim Bolz. INVOCATION AND PLEDGE Councilmember Dillon gave the invocation, the Pledge of Allegiance was led by Councilmember Barrett. 7 Item 2. City Council Minutes 02-21-2023 Page 3 of 5 CITIZENS COMMENTS No one addressed the Council. REPORTS 1. Construction update from DEC Engineering, Dannenbaum, regarding the IH-35 / FM 455 Expansion Project. Rodney Prince provided an overview and update regarding the construction. Discussion ensued regarding the completion of the project, the remaining valve and fire hydrant pours, repair to the street cuts along FM 455, and clearing the Right-of- way for the TxDOT project along IH-35. 2. Presentation and overview of the City Secretary's Office. City Secretary Edwards provided a presentation and overview of the City Secretary’s Office. Discussion ensued regarding the volume of Public Information Act requests, the process for an Attorney General’s records opinion, and back storage for Laserfiche. CONSENT AGENDA 3. Consideration and possible action on the minutes from the February 3, 2023, meeting. 4. Consideration and possible action on the minutes from the February 4, 2023, meeting. 5. Consideration and possible action on the minutes from the February 6, 2023, meeting. 6. Consideration and possible action on accepting a donation in the amount of $5000.00 from Sanger Softball Association to upgrade the new scoreboards at Porter Park. 7. Consideration and possible action on Resolution 2023-01, Appointing Matt Fuller to the Ray Roberts Planning Commission. Councilmember Dillon asked for clarification on Item 7 regarding Matt serving on the Ray Roberts Commission and the City’s P&Z Commission. Councilmember Bilyeu asked about the donation and recognition of Item 6. Motion to approve made by Councilmember Barrett, Seconded by Councilmember Bilyeu. Voting Yea: Councilmember Chick, Councilmember Dillon, and Councilmember Gann. Motion passed unanimously. 8 Item 2. City Council Minutes 02-21-2023 Page 4 of 5 ACTION ITEMS 8. Consideration and possible action on ratifying Change Request No. 1 in the amount of $5,060.00 with North Rock Construction for the Porter Park Softball Field Renovations. Director Nolting provided an overview and update on the project, including the donation in the same amount as the change order. Motion to approve the ratification made by Councilmember Barrett, Seconded by Councilmember Gann. Voting Yea: Councilmember Bilyeu, Councilmember Chick, and Councilmember Dillon. Motion passed unanimously. 9. Consideration and possible action on ratifying Change Request No. 2 in the amount of $531.30 with North Rock Construction for the Porter Park Softball Field Renovations. Motion to approve made by Councilmember Barrett, Seconded by Councilmember Gann. Voting Yea: Councilmember Bilyeu, Councilmember Chick, and Councilmember Dillon. Motion passed unanimously. 10. Consideration and possible action on Change Order No. 9 in the amount of $334,518.20 with Quality Excavation, LLC for the FM 455 Project to identify all line item overruns; and authorize the City Manager to execute said Change Order No. 9. Director Bolz provided an overview of the item. Discussion ensued regarding overruns, as-built drawings, and confirming that all City utilities have been moved for the FM 455 and IH-35 project. Motion to approve made by Councilmember Barrett, Seconded by Councilmember Dillon. Voting Yea: Councilmember Bilyeu, Councilmember Chick, and Councilmember Gann. Motion passed unanimously. FUTURE AGENDA ITEMS City Manager Noblitt stated that the Council would need to hold a Special meeting on May 16, 2023, to canvass the General Election. INFORMATIONAL ITEMS 11. Atmos Rider GCR - Rate Filing Docket No 10170 - January 25, 2023 12. Atmos Industrial Sales tariff sheet Schedule I - January 20, 2023 9 Item 2. City Council Minutes 02-21-2023 Page 5 of 5 EXECUTIVE SESSION Pursuant to the Open Meetings Act, Chapter 551, the City Council Will Meet in a Closed Executive Session in Accordance with the Texas Government Code: Section 551.072. DELIBERATION REGARDING REAL PROPERTY For deliberations regarding the purchase, exchange, lease, or value of real property if deliberation in an open meeting would have a detrimental effect on the position of the governmental body in negotiations with a third person specifically, Michael Riley, Laura Riley, and J. Mike Riley Ranch Properties, LLC, (collectively the "Owner"). Council did not convene into executive session. RECONVENE INTO REGULAR SESSION ADJOURN There being no further business, Mayor Muir adjourned the meeting at 8:10 p.m. _______________________________ Thomas E. Muir, Mayor ______________________________ Kelly Edwards, City Secretary 10 Item 2. CITY COUNCIL COMMUNICATION DATE: March 6, 2023 FROM: Ramie Hammonds, Development Services Director AGENDA ITEM: Consideration and possible action on authorizing staff to issue a Request for Qualifications (RFQ) for professional services to perform a Housing Study. SUMMARY:  The current Housing Study was done in-house in 2016.  This study will allow the city to collect information on current housing inventory, future housing based on approved projects, projected future housing needs based on Future Land Use Map, and market demands. FISCAL INFORMATION: Budgeted: YES Amount: N/A GL Account: N/A RECOMMENDED MOTION OR ACTION: Staff recommends APPROVAL. ATTACHMENTS: RFQ Exhibit A 11 Item 3. CITY OF SANGER, TEXAS REQUEST FOR QUALIFICATIONS (RFQ) HOUSING STUDY PROPOSAL DUE DATE: 12:00 Noon Central Time Tuesday, April 4, 2023 ISSUED BY: CITY OF SANGER DEVELOPMENT SERVICES DEPARTMENT 12 Item 3. 2 CITY OF SANGER, TEXAS REQUEST FOR QUALIFICATIONS (RFQ) HOUSING STUDY SECTION 1. INTRODUCTION: Purpose The City of Sanger, Texas is seeking the assistance of a professional consultant to complete a Housing Study. The study would include current housing inventory with house sizes , housing demand based on City of Sanger current and future growth opportunities, along with current market demand. SECTION 2. COMMUNITY PROFILE: City Overview The City of Sanger, Texas, with a population of approximately 9,000 is located in North Texas within Denton County and located along both sides of I-35 and north and south of FM 455. Sanger is comprised of nearly twelve (12) square miles and is neighbored by Denton to the south, Valley View to the north, Lake Ray Roberts and Pilot Point to the east, and an unincorporated area to the west. Major transportation corridors include I-35 and FM 455. The city is comprised of a mix of residential, commercial, and industrial la nd uses as well as a vibrant downtown area. SECTION 3. PROJECT BACKGROUND: The City recently adopted a new comprehensive plan called Sanger 2040 Comprehensive Plan. This plan is meant to be a guideline for future development. The Housing Study needs to reflect the increase in commercial and industrial development and the housing needs as they relate to that future development. There are housing developments that have recently been approved that would need to be accounted for in this study. The City previously performed an in-house housing study in 2016. SECTION 4. SCOPE OF SERVICES AND DELIVERABLES: The selected consultant shall prepare the Housing Study to include the current housing inventory including house sizes, housing inventory with recently approved developments, and identify future housing needs, and current market trends and demands. SECTION 5. INFORMATION PROVIDED BY THE CITY: The Future Land Use Map, map of City Limits and ETJ, Sanger 2040 Comprehensive Plan, current Housing Study, and newly approved developments. Maps and the Sanger 2040 Comprehensive Plan can be found on the City’s website. SECTION 6. TIMELINE: It is expected that a contract will be executed between the City and the selected consulting firm within forty-five (45) days of the due date for proposals. It is anticipated that the project will be 13 Item 3. 3 completed within six (6) months from the signing of the contract. SECTION 7. SUBMISSION DETAILS: Statement of Qualifications The consultant shall submit a Statement of Qualifications. The statement, at minimum, should address each of the specific topics listed below (additional information may be included). Failure to include any of the following requested information may be cause for the proposal to be considered incomplete and thus rejected. 1. Provide a cover letter on firm letterhead and identify the project manager and key staff involved along with contact information for the project manager. 2. Written presentation of the qualifications of the firm and their understanding of the work to be performed. 3. List of services that will be provided. 4. Availability, credentials, and related experience of the firm and key staff with similar studies, preferably with municipal governments. 5. Provide copies of the resumes of the proposed project manager and key staff. Provide information on specific experiences, including roadway impact study, with successful outcomes in conducting the process and making presentations to public bodies. 6. Include with their proposals a list of at least three (3) current references for whom comparable work has been performed in the past three (3) years, specifically citing work in communities similar to Sanger. This list shall include the municipality’s name, person to contact, address, telephone number, email address, and a brief, but adequately detailed description of the work performed. 7. Provide complete or partial examples of work similar in nature to this project. 8. List of anticipated sub-contractors and/or partners, if any, and their availability, credentials, and related experience. 9. Explain the methodology you propose to successfully perform the services outlined in the Scope of Work. 10. Include a statement on the anticipated time frame based on the scope of work as listed in this RFQ. Report on prior experience in delivering services within the prescribed time frame. SECTION 8. SUBMISSION INSTRUCTIONS: STATEMENT OF QUALIFICATIONS MUST BE RECEIVED BY 12:00 NOON (CENTRAL TIME) APRIL 4, 2023 SUBMISSIONS RECEIVED AFTER THE DEADLINE WILL NOT BE CONSIDERED Four (4) printed copies of the Statement of Qualifications in a sealed envelope should be sent to: Ramie Hammonds Development Services Director City of Sanger 14 Item 3. 4 502 Elm Street Sanger, TX 76266 Phone: 940-458-2059 Email: rhammonds@sangertexas.org The proposals will be publicly recognized at the same location (City Hall, 502 Elm St, Sanger TX 76266) at 2:00 PM (Central Time) on April 4, 2023. One (1) electronic, PDF copy of the Statement should also be included on a USB/Flash drive. Questions should be directed to Ramie Hammonds, Development Services Director, at the contact information listed above. SECTION 9. SELECTION PROCESS AND CRITERIA FOR CONSIDERATION OF QUALIFICATIONS: Statements will be reviewed and evaluated by the City staff and on a number of criteria, including, but not limited to the following:  Overall responsiveness and quality of the proposal in clearly stating an understanding of the project.  Technical understanding of ordinance writing for a City like Sanger, Texas.  Experience and knowledge in developing similar plans by consultant personnel who will be directly involved with the project.  The nature and quality of the expertise the consultant possesses in a full range of required disciplines.  The experience and availability of support staff for the project.  The ability to complete the plan within the given timeframe.  References. After evaluating the proposals, the City may request additional information from any consultant identified as most responsive to this RFQ. At its discretion, the City may require any consultant to make a presentation to provide an opportunity to clarify the submission. The City will schedule any such presentations. The City will evaluate the written proposals and will select the consultant which meets the best interest of the City. The City shall be the sole judge of its own best interests, the proposals, and the resulting negotiated agreement. The City’s decisions will be final. The City reserves the right to negotiate any and all elements of this proposal, including, but not limited to, the fee structure and terms of the contract, with the proposing firm selected. A. DISCLAIMER This RFQ does not commit the City to enter into a contract, nor does it obligate the City to pay for any costs incurred in the preparation and submission of Statements or anticipation of a contract. The City reserves the right at its sole discretion: to make selections, to reject any or all submissions, to issue subsequent RFQ, to remedy technical errors in the RFQ process, and to enter into a contract with one or more consultants for the provisions of any, all or some of the services described herein. 15 Item 3. 5 B. AGREEMENT FOR PROFESSIONAL SERVICES Attached as Exhibit A is the City of Sanger’s standard agreement for professional services. The agreement also indicates the insurance and indemnification requirements that the City will require of the selected firm. C. ADDITIONAL INFORMATION: 1. A person or business that contracts with Sanger or who seeks to contract with the City must file a “Conflict of Interest Questionnaire” (FORM CIQ) which is available online at www.ethics.state.tx.us and a copy of which is attached to this guideline. The form contains mandatory disclosures regarding “employment or business relationships” with a municipal officer. Officials may be asked to clarify or interpret various portions of the questionnaire. 2. Compliance with HB 89. A person or business that contracts with Sanger or who seeks to contract with the City shall not boycott Israel at any time while providing products or services to the City of Sanger. This requirement does not apply to companies with fewer than ten full-time employees; or contracts that are less than $100,000.00. [ ] Yes, we agree [ ] No, we do not agree [ ] N/A 3. Respondent verifies that it does not boycott energy companies and will not boycott energy companies during the term of this contract, as those terms are defined by Chapter 2274, Government Code. This requirement does not apply to companies with fewer than ten full-time employees; or contracts that are less than $100,000.00. [ ] Yes, we agree [ ] No, we do not agree [ ] N/A 4. Respondent verifies that it does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association and will not discriminate during the term of this contract against a firearm entity or firearm trade association, as those terms are defined by Chapter 2274, Government Code. This requirement does not apply to companies with fewer than ten full- time employees; or contracts that are less than $100,000.00. [ ] Yes, we agree [ ] No, we do not agree [ ] N/A 16 Item 3. 6 5. Compliance with SB 252. A person or business that contracts with Sanger or who seeks to contract with the City shall not do business with Iran, Sudan, or a foreign terrorist organization while providing products or services to the City of Sanger. [ ] Yes, we agree [ ] No, we do not agree The undersigned affirms that he/she has read and understands the specifications, terms, and conditions, all exhibits and attachments contained herein and that they are duly authorized to execute this agreement and response to the Request for Qualifications. Signature Company Date 17 Item 3. PROFESSIONAL SERVICES AGREEMENT BY AND BETWEEN THE CITY OF SANGER AND #RESPONDENT# THIS AGREEMENT is made and entered by and between the City of Sanger, Texas, hereinafter referred to as "Sanger", and _______________, a Texas corporation, hereinafter referred to as “RESPONDENT” to be effective from and after the date as provided herein. WITNESSETH WHEREAS, Sanger desires to engage the services of a qualified RESPONDENT to _____________________; and WHEREAS, Sanger finds that RESPONDENT is the most qualified party to provide such services; and WHEREAS, RESPONDENT desires to render such services for Sanger upon the terms and conditions provided herein; and NOW, THEREFORE, for and in consideration of the covenants contained herein, and for the mutual benefits to be obtained hereby, the parties hereto agree as follows: I. ENGAGEMENT Sanger hereby agrees to retain RESPONDENT to _________________, and RESPONDENT agrees to perform such services in accordance with the Scope of Services and the terms and conditions of this Agreement. II. SCOPE OF SERVICES The parties agree that RESPONDENT shall perform such services as are further described in Exhibit “A” hereto (collectively “Scope of Services”). The parties understand and agree that deviations or modifications in the Scope of Services may be authorized from time to time by Sanger but said authorization must be made in writing. III. COMPLETE AGREEMENT This Agreement, including Exhibit "A", constitutes the entire agreement by and between the parties regarding the subject matter hereof and supersedes all prior or contemporaneous written or oral understandings. This Agreement may only be amended, supplemented, modified, or canceled by a duly executed written instrument. IV. TERM OF AGREEMENT/TERMINATION The initial term of this Agreement shall commence upon the complete execution of the Agreement by Sanger and RESPONDENT and shall continue until the Scope of Services is completed. This agreement may be terminated by either party with thirty (30) days’ notice unless specified otherwise in Exhibit “A”. 18 Item 3. In the event of termination by Sanger, RESPONDENT shall be compensated in accordance with the terms of this Agreement and shall deliver to Sanger all finished or unfinished documents, data, studies, surveys, drawings, maps, models, reports, photographs, or other items prepared by RESPONDENT in connection with this Agreement. V. COMPENSATION AND EXPENSES RESPONDENT shall be paid for performance of the Scope of Services as set forth in Exhibit “A”. VI. INDEPENDENT CONTRACTOR RESPONDENT covenants and agrees that it is an independent contractor and not an officer, agent, servant or employee of Sanger; that it shall have exclusive control of and exclusive right to control the details of the work performed hereunder and all persons performing same, and shall be responsible for the acts and omissions of its officers, agents, employees, contractors, subcontractors and RESPONDENTs; that the doctrine of respondent superior shall not apply as between Sanger and RESPONDENT, its officers, agents, employees, contractors, subcontractors and RESPONDENTs, and nothing herein shall be construed as creating a partnership or joint enterprise between Sanger and RESPONDENT. VII. ASSIGNMENT RESPONDENT agrees that this Agreement shall not be assigned without the prior written consent of Sanger, except to an Affiliate of RESPONDENT. Affiliate shall mean (1) any corporation or other entity controlling, controlled by, or under common control with (directly or indirectly) RESPONDENT, including, without limitation, any parent corporation controlling RESPONDENT or any subsidiary that RESPONDENT controls; (2) the surviving corporation resulting from the merger or consolidation of RESPONDENT; or (3) any person or entity which acquires all of the assets of RESPONDENT as a going concern. RESPONDENT shall be permitted to enter into subcontracts for performance of portions of the Scope of Services; however, RESPONDENT shall not subcontract the entirety of the Scope of Services to a single subcontractor without Sanger’s consent. RESPONDENT further agrees that the assignment of any portion or feature of the work or materials required in the performance of this Agreement shall not relieve the RESPONDENT from its full obligations to Sanger as provided by this Agreement. VIII. AUDITS AND RECORDS RESPONDENT agrees that Sanger or its duly authorized representatives shall, until the expiration of three (3) years after termination under this Agreement, upon reasonable notice, have access to and the right to examine and photocopy any and all books, documents, papers and records of RESPONDENT which are directly pertinent to the services to be performed under this Agreement . RESPONDENT agrees that Sanger shall have access during normal working hours to all necessary RESPONDENT’s facilities and shall be provided adequate and appropriate work space. IX. WARRANTY 19 Item 3. RESPONDENT warrants that (a) it and each of its employees, RESPONDENTs and subcontractors, if any, that it uses to provide and perform professional services has the necessary knowledge, skills, experience, qualifications, and resources to provide and perform the services in accordance with the agreement and the Scope of Services; and (b) the professional services will be performed for and delivered to Sanger in a good, diligent, workmanlike manner in accordance with industry standards. X INDEMNITY RESPONDENT, to the extent allowable by law, shall defend, indemnify, and hold harmless Sanger, its City council, officers, employees, and agents from and against all citations, claims, costs, damages, demands, expenses, fines, judgments, losses, penalties, or suits, which in any way arise out of, relate to, or result from the performance of the work or which are caused by the intentional acts or negligent acts or omissions of its subcontractors, any officers, agents, or employees. Sanger, to the extent allowable by law, shall defend, indemnify, and hold harmless the RESPONDENT, its officers, employees, and agents from and against all citations, claims, costs, damages, demands, expenses, fines, judgments, losses, penalties, or suits, which in any way arise out of, relate to, or result from the performance of the work or which are caused by the intentional acts or negligent acts or omissions of its subcontractors, any officers, agents, or employees. XI. MAILING OF NOTICES RESPONDENT agrees that all notices or communications to Sanger permitted or required under this Agreement shall be addressed to Sanger at the following address: City Manager City of Sanger 502 Elm Street P.O. Box 1729 Sanger, Tx 76266 Sanger agrees that all notices or communications to RESPONDENT permitted or required under this Agreement shall be addressed to RESPONDENT at the following address: [Insert Address] All notices or communications required to be given in writing by one party or the other shall be considered as having been given to the addressee on the date such notice or communication is posted by the sending party. XII. MISCELLANEOUS 1. The City of Sanger has found that RESPONDENT is the most qualified party to fulfill the requirements of the agreement as this is a contract for the purchase of personal and/or professional services and therefore is exempt from competitive bidding. 20 Item 3. 2. A person or business that contracts with the Sanger or who seeks to contract with Sanger must file a “Conflict of Interest Questionnaire” (FORM CIQ) which is available online at www.ethics.state.tx.us and a copy of which is attached to this guideline. The form contains mandatory disclosures regarding “employment or business relationships” with a municipal officer. Officials may be asked to clarify or interpret various portions of the questionnaire. 3. Compliance with SB 252: RESPONDENT agrees per SB 252 that RESPONDENT shall not do business with Iran, Sudan or a foreign terrorist organization while providing products or services to the City of Sanger. 4. Compliance with HB 89: RESPONDENT agrees per HB 89 that RESPONDENT shall not boycott Israel at any time while providing products or services to the City of Sanger. This requirement does not apply to companies with fewer than ten full-time employees; or contracts that are less than $100,000.00. 5. Respondent verifies that it does not boycott energy companies and will not boycott energy companies during the term of this contract, as those terms are defined by Chapter 2274, Government Code. This requirement does not apply to companies with fewer than ten full-time employees; or contracts that are less than $100,000.00. 6. Respondent verifies that it does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association and will not discriminate during the term of this contract against a firearm entity or firearm trade association, as those terms are defined by Chapter 2274, Government Code. This requirement does not apply to companies with fewer than ten full-time employees; or contracts that are less than $100,000.00. XIII. VENUE/GOVERNING LAW The parties agree that the laws of the State of Texas shall govern this Agreement, and that it is performable in City of Sanger, Texas. Exclusive venue shall lie in Denton County, Texas. XIV. SUCCESSORS AND ASSIGNS RESPONDENT and their partners, successors, subcontractors, executors, legal representatives, and administrators are hereby bound to the terms and conditions of this Agreement. XV. INSURANCE RESPONDENT shall procure and maintain in force during the terms of any contract awarded pursuant to this RFP, at its own cost, the following minimum insurance coverage: A. Workers’ Compensation and Employers’ Liability: 21 Item 3. i. State of Texas: $1,000,000 Each Accident ii. Employer’s Liability: $100,000 Each Accident B. Commercial General Liability: i. Bodily Injury & Property Damage with a General Aggregate Limit: $1,000,000 ii. Personal & Advertising Injury Limit $500,000 iii. Each Occurrence Limit $1,000,000 The policy shall be on an Occurrence Form and include the following coverage: Premises Operations; Personal and Advertising Injury; Medical Payments; Liability assumed under an Insured Contract; Independent Contractors; and Broad Form Property Damage. Coverage provided should be at least as broad as found in Insurance Services Office (ISO) form CG0001. C. Commercial Automobile Liability Limits: i. Bodily Injury & Property Damage Combined Single Limit: $1,000,000 Prior to the execution of any awarded contract by the City, the successful RESPONDENT shall forward Certificates of Insurance to the Purchasing Manager. The required insurance policies shall be procured and maintained in full force and effect for the duration of the awarded contract. Certificate Holder shall be the City of Sanger, Texas at 502 Elm Street, Sanger, Texas 76266. XIV. SEVERABILITY In the event a term, condition, or provision of this Agreement is determined to be void, unenforceable, or unlawful by a court of competent jurisdiction, then that term, condition, or provision, shall be deleted and the remainder of the Agreement shall remain in full force and effect. XV. AUTHORITY TO SIGN The undersigned officers and/or agents of the parties hereto are the properly authorized officials and have the necessary authority to execute this Agreement on behalf of the parties hereto. This Agreement shall be effective from and after the date of execution by the last signatory hereto as evidenced below. SIGNED on the date indicated below. 22 Item 3. Date: _______________ RESPONDENT BY: _________________________________ Manager/Partner Date: _______________ CITY OF SANGER BY: _________________________________ Mayor/City Manager APPROVED AS TO FORM: ________________________ Hugh Coleman City Attorney 23 Item 3. Exhibit “A” Bid Response/Scope of Services 24 Item 3. CITY COUNCIL COMMUNICATION DATE: March 6, 2023 FROM: Ramie Hammonds, Development Services Director AGENDA ITEM: Conduct a public hearing on a request for the Replat of Lot 2, of the IESI Industrial Park, being 2.993 acres located within the City of Sanger. Generally located along the north side of Utility Road approximately 1464 feet east of the intersection of North Stemmons Frwy and Utility Road. SUMMARY:  The applicant is proposing to create 1 industrial lot of 2.993 acres, from 1 previously platted tract.  The site is zoned Industrial 1  The applicant is proposing to create warehouses on the site.  Lot 2-R has approximately 461 feet of frontage on Utility Road.  There was no right-of-way dedication required.  The replat will establish all easements required to make the site a developable site.  Staff mailed out 9 notices and at the time of this report has not received any responses.  The property is located in the City of Sanger.  The Planning and Zoning Commission recommend APPROVAL on 2-13-23 with the condition all comments were satisfied prior to City Council. FISCAL INFORMATION: Budgeted: N/A Amount: N/A GL Account: N/A N/A ATTACHMENTS: Location Map 25 Item 4. UTILITY RD 900UTILITY RD 902UTILITY RD /Project Name: IESI Industr ial ParkReplatProject: 23SANZO N-0002 0 250 500125 Fe et DISCLA IMER:This map wa s g en e ra te d by GI S da ta p ro vid edby the S a ng er GIS De pa rtme nt . Th e City o f Sanger do es n ot gu a ra n te e the c orrec tne ss oraccuracy o f a n y fe a tu re s o n th is ma p. Th ese ma pproducts are fo r illust ra tio n pu rpo se s o n ly an dare not suit ab le fo r site -s pe cific d e cision ma king .GIS dat a is su bje ct to co nst an t cha n ge s, an dmay not b e co mple te , a ccu rat e o r cu rren t.Date: 1/22 /2 02 3 4 :0 5:4 8 P MDoc Name : 2 3 SA NZON-0 00 2 _IE S I I nd us tria l P ark Rep latCity L imi ts Exhi bi ts SubjectArea 26 Item 4. CITY COUNCIL COMMUNICATION DATE: March 6, 2023 FROM: Ramie Hammonds, Development Service Director AGENDA ITEM: Conduct a public hearing regarding amending Chapter 13 Utilities, by adding Article 13.2800 Municipal Setting Designation, Sections 13.2801 Definitions, 13.2802 Use of Groundwater in MSD Areas Prohibited, 13.2803 Application for City Council Approval of MSD, 13.2804 Staff Review, 13.2805 Notice of Public Meeting, 13.2806 Public Meeting, 13.2807 City Council Public Hearing, 13.2808 Limitation on Reapplication, and 13.2809 Additional Provisions, Enforcement, and Penalties SUMMARY:  The City of Sanger’s Code of Ordinance currently does not address Municipal Setting Designations (MSD’s).  This ordinance will establish a process and guidelines for requesting a MSD.  MSD’s are requested when a property has contamination that would typically require remediation.  Often the remediation is costly and makes developing the property difficult.  In certain cases these properties can apply for a MSD to allow the property to develop or be used without remediation.  This ordinance gives City Council the ability to approve, conditionally approve, disapprove, or postpone action on the application. FISCAL INFORMATION: Budgeted: N/A Amount: N/A GL Account: N/A RECOMMENDED MOTION OR ACTION: Staff recommends APPROVAL. ATTACHMENTS: Ordinance No 03-04-23 27 Item 5. Ordinance – 03-04-23 Amendment to Chapter 13 Municipal Settings Designation Page 1 of 2 CITY OF SANGER, TEXAS ORDINANCE 03-04-23 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SANGER, DENTON COUNTY, TEXAS, REGARDING AMENDING THE CITY OF SANGER CODE OF ORDINANCE, CHAPTER 13 UTILITIES, ARTICLE 13.2800 MUNICIPAL SETTING DESIGNATION, SECTIONS 13.2801 DEFINITIONS, 13.2802 USE OF GROUNDWATER IN MSD AREAS PROHIBITED, 13.2803 APPLICATION FOR CITY COUNCIL APPROVAL OF MSD, 13.2804 STAFF REVIEW, 13.2805 NOTICE OF PUBLIC MEETING, 13.2806 PUBLIC MEETING, 13.2807 CITY COUNCIL PUBLIC HEARING, 13.2808 LIMITATION ON REAPPLICATION, AND 13.2809 ADDITIONAL PROVISIONS, ENFORCEMENT, AND PENALTIES; PROVIDING FOR THE REPEAL OF ALL ORDINANCES IN CONFLICT; PROVIDING A CUMULATIVE CLAUSE; PROVIDING FOR A SEVERABILITY CLAUSE; PROVIDING FOR A PENALTY OF FINE IN ACCORDANCE WITH SECTION 1.109 OF THE CODE OF ORDINANCE FOR VIOLATIONS; AND PROVIDING A SAVINGS CLAUSE; AUTHORIZING PUBLICATION; AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, the City of Sanger (the “City”) is a home rule municipality regulated by state law and Charter; and WHEREAS, the City Council finds it necessary for the public health, safety, and welfare that development occur in a controlled and orderly manner; and WHEREAS, all request for amendment to the Code of Ordinance were duly filed with the City of Sanger, Texas; and WHEREAS, the following provision of proper legal notice requirements, were made in the time and manner prescribed by law; and WHEREAS, the City Council finds that the passage of this Ordinance is in the best interest of the citizens of Sanger. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF SANGER, TEXAS: SECTION 1. That an amendment to Chapter 13 Utilities, Article 13.2800 Municipal Setting Designation, Sections 13.2801 Definitions, 13.2802 Use of Groundwater in MSD Areas Prohibited, 13.2803 Application for City Council Approval of MSD, 13.2804 Staff Review, 13.2805 Notice of Public Meeting, 13.2806 Public Meeting, 13.2807 City Council Public Hearing, 13.2808 Limitation on Reapplication, and 13.2809 Additional Provisions, Enforcement, and Penalties as described in Exhibit A is hereby granted. 28 Item 5. Ordinance – 03-04-23 Amendment to Chapter 13 Municipal Settings Designation Page 2 of 2 SECTION 2. That all matters stated in the preamble are found to be true and correct and are incorporated herein as if copied in their entirety. SECTION 3. It is hereby declared to be the intention of the City Council that the sections, paragraphs, sentences, clauses, phrases and words of this Ordinance are severable and, if any word, phrase, clause, sentence, paragraph, or section of this Ordinance shall be declared unconstitutional by the valid judgment or decree of any court of competent jurisdiction, such unconstitutionality shall not affect any of the remaining portions of this Ordinance, since the same would have been enacted by the City Council without the incorporation in this Ordinance of any such unconstitutional word, phrase, clause, sentence, paragraph, or section. SECTION 4. Any person, firm or corporation who shall violate any of the provisions of this article shall be guilty of a misdemeanor and upon conviction shall be fined in accordance with the general penalty provision found in The Code of Ordinances, Section 1.109 General Penalty for Violations of Code. SECTION 5. This ordinance will take effect immediately from and after its passage and the publication of the caption, as the law and Charter in such cases provide. PASSED AND APPROVED by the City Council of the City of Sanger, Texas, on this 6th day of March, 2023. APPROVED: ________________________________ ATTEST: Thomas E. Muir, Mayor ________________________________ APPROVED TO FORM: Kelly Edwards, City Secretary ________________________________ Hugh Coleman, City Attorney 29 Item 5. EXHIBIT A ARTICLE 13.2800 MUNICIPAL SETTING DESIGNATION (MSD) Sec. 13.2801 Definitions For the purposes of this article, the following terms, phrases, words, abbreviations, and their derivations shall have the meaning given herein. When not inconsistent with the context, words used in the present tense include the future tense, words in the plural number include the singular number and words in the singular number include the plural number. The word "shall" is always mandatory and not merely directory. Words not defined shall be given their common and ordinary meaning. Affected community. Those persons entitled to notice as defined in section 13-2803(b)(6). Authorized representative. For purposes of signing an application, if the applicant is a corporation, the president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the corporation; if the applicant is a partnership or sole proprietorship, a general partner or proprietor, respectively; and if the applicant is a local government, the chief executive officer or his authorized designee. Chemical or contaminant of concern. Any chemical that has the potential to adversely affect ecological or human receptors due to its concentration, distribution, and mode of toxicity. City attorney. The City Attorney for the City of Sanger or the City Attorney's authorized representative. Designated groundwater. Groundwater that will be or is prohibited from use as potable water, or for all uses, by a municipal setting designation ordinance. Designated property. The property that will be or is subject to a municipal setting designation ordinance. The designated property may cover several platted lots or tracts of land. Director. The Director of Development Services for the City of Sanger, or the Director's authorized representative. Environmental risk assessment. The qualitative and quantitative evaluations performed to define the risk posed to human health and/or the environment by the presence or potential presence and/or use of pollutants. Groundwater. Water below the surface of the earth. Ingestion protective concentration level. The protective concentration level for human ingestions of contaminants of concern established by the TCEQ under the Texas Risk Reduction Program, determined as if there was no municipal setting designation. Ingestion protective concentration level zone. The area where concentrations of contaminants of concern from sources on or migrating through the designated property are greater than the 30 Item 5. ingestion protection concentration level, determined as if there was no municipal setting designation. Municipal setting designation (MSD). A designation as provided by V.T.C.A. Health and Safety Code Ch. 361, Subch. W, which authorizes the Executive Director of the Texas Commission on Environmental Quality to certify municipal setting designations to limit the scope of, or eliminate the need for, investigations or response actions addressing contaminant impacts to groundwater that has been restricted from use by ordinance or restrictive covenant. Municipal setting designation ordinance. An ordinance adopted pursuant to this article. Noningestion protective concentration level. The protective concentration level for dermal contact or inhalation of contaminants of concern established by the TCEQ under the Texas Risk Reduction Program. Noningestion protective concentration level exceedance zone. The area where concentrations of contaminants of concern from sources on or migrating from or through the designated property are greater than noningestion protection concentration levels for contaminants of concern established by the TCEQ under the Texas Risk Reduction Program. Potable water. Water used for irrigating crops intended for human consumption, as well as water used for drinking, showering, bathing, or cooking purposes. Protective concentration level. The lowest concentration level for a contaminant of concern within a source medium is determined from all applicable exposure pathways and as defined in the Texas Risk Reduction Program. Response action. The control, decontamination, or removal from the environment of a contaminant or hazardous substance pursuant to V.T.C.A. Health and Safety Code Ch. 361, Subch. W, "Municipal Setting Designation," of "Solid Waste Disposal Act". TCEQ. The Texas Commission on Environmental Quality. TCEQ application. The application submitted to the TCEQ for certification of a municipal setting designation. To the extent known. Information known by an applicant or applicant's agent after review of all public and private records and other information sources available in the exercise of due diligence. Sec. 13.2802 Use of Groundwater in MSD Areas Prohibited (a) A person commits an offense if the person intentionally, knowingly, or with criminal negligence uses groundwater in the designated property as a potable or non-potable water source. (b) A person commits an offense if the person intentionally, knowingly, or with criminal negligence uses groundwater in designated property for any purpose prohibited as a condition of council approval, as specified in section 13.2807(d). 31 Item 5. Sec. 13.2803 Application for City Council Approval of MSD (a) A person seeking city council approval of an MSD for an area within the corporate limits of the City of Sanger shall apply in writing to the Development Services Department of the City of Sanger, with the number and format of copies, as determined by the director. (b) An application shall contain: (1) The applicant's name and address, and the name, address, daytime telephone number, and email address of both the applicant's contact person and the licensed professional who prepared the application; (2) The location and legal description of the proposed outer boundaries of the MSD area for which designation is sought; (3) A statement as to whether a public drinking water supply system exists that satisfies the requirements of V.T.C.A. Health and Safety Code Ch. 341 and that supplies or is capable of supplying drinking water to the area for which the MSD is sought, and property within one-half mile of the area for which the MSD is sought; (4) A description of the groundwater sought to be restricted, including the identified chemicals of concern therein and the levels of contamination known to the applicant, and the identified vertical and horizontal extent of the contamination. If the applicant has not documented groundwater contamination offsite that originates from the area for which an MSD is sought, the application shall include a statement as to whether contamination more likely than not exceeds residential assessment levels offsite and the basis for that statement; (5) Identification of the points of origin of the contamination, and identification of the person(s) responsible for the contamination, to the extent known; (6) A listing of: a. All state-registered private water wells within five (5) miles from the boundary of the area for which the designation is sought, including a notation of those wells that are used for potable water purposes (if known); b. Each retail public utility, as that term is defined in the Texas Water Code, that owns or operates a groundwater supply well located not more than five (5) miles from the area for which the MSD is sought; c. Each municipality, other than the City of Sanger, with a boundary located not more than one-half (½) mile from the area for which the MSD is sought; or that owns or operates a groundwater supply well located not more than five (5) miles from the area for which the MSD is sought; and d. All owners of real property lying within two hundred (200) feet of the subject property, as the ownership appears on the last approved city tax roll. (7) A site map, drawn to scale, including a metes and bounds description of the proposed designated property, the boundary of the proposed MSD area, the location of groundwater on the proposed MSD area, and the extent of groundwater contamination to the limits that it has been defined. The map shall include a statement by a professional 32 Item 5. land surveyor registered by the Texas Board of Professional Surveying attesting to the accuracy of the metes and bounds description; (8) The location of all soil sampling points and groundwater monitoring wells; (9) For each contaminant of concern found at the site, to the extent known, provide a table displaying the following information: a. The level of contamination, the ingestion protective concentration level, and noningestion protective concentration levels, all expressed as mg/L or mg/kg, depending on the sampling medium; and b. The critical protective concentration level as defined without the municipal setting designation, highlighting any exceedances; and c. The critical protective concentration level as defined with the municipal setting designation, highlighting any exceedances; and d. A digital file, in a format acceptable to the Director, that summarizes this information. (10) A statement as to whether contamination on and off the designated property will exceed a residential assessment level as defined in the Texas Risk Reduction Program if known, and the basis for that statement; (11) A description of any environmental regulatory actions that have been taken within the last five (5) years in conjunction with the designated property, to the extent known; (12) A listing of all existing TCEQ, U.S. Environmental Protection Agency registrations, permits, and identification numbers that apply to the designated property; (13) A summary of any environmental site assessment reports filed with the TCEQ regarding any site investigation or response actions that are planned, ongoing, or completed related to this designated property; (14) A statement as to whether the designated property has been submitted to the Texas Voluntary Cleanup Program (V.T.C.A. Health and Safety Code § 361.601) or similar state or federal program, and a description of the designated property's status in the program; (15) Any other information that the director deems pertinent. (c) The application shall be signed by an authorized representative of the applicant and shall contain the following certification statement: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in a manner designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." (d) An application shall be accompanied by: 33 Item 5. (1) An electronic file of the names and addresses of persons listed in subsection (b)(6) above, in a format acceptable to the director and compatible with city information systems; and (2) A set of printed mailing labels with the names and addresses of persons listed in subsection (b)(6) above; and (3) A nonrefundable application fee in an amount set by the city council; and (4) It is the sole responsibility of the applicant to ensure that the language of the public notice, as well as the notification process itself, meets the state requirements. (e) An applicant may withdraw their application only in writing by letter sent by certified mail, return receipt requested, to the Director, and shall forfeit the application fee. If the Director has not issued public notice prior to the receipt of the withdrawal letter, the applicant may reapply at any time. If public notice has been issued, a new application is subject to the limitations of section 13-2808 below. Sec. 13.2804 Staff Review (a) For purposes of the times stated in this article, an application is deemed to have been received on the date that the application was actually received by the Director, as indicated by the filing date on the application by the Development Services department. (b) The application for an MSD shall be forwarded to the development review committee (DRC) for staff review. The purpose of the review is to determine whether the application is complete and whether any current or future city property or other interests have the potential to be impacted by the proposed MSD. City staff shall not conduct an environmental risk assessment of the application. (c) If the Director, in his or her sole discretion, determines that it is likely that a source of a contaminant of concern originated on the designated property, and that the ingestion or noningestion protective concentration level exceedance zone for that contaminant of concern extends to the public right-of-way adjacent to the designated property, the Director may recommend that the municipal setting designation include a condition that the public right- of-way adjacent to the property be included, at no additional cost to the city, in the TCEQ application for the MSD. (d) If the Director determines that the application is incomplete or insufficient, the application will be returned to the applicant, noting the deficiencies in writing. The applicant shall have thirty (30) days from the date of the deficiency letter to correct the deficiencies and resubmit the application. If the applicant fails to submit a corrected application within the allotted time, the application shall be deemed to be withdrawn and the application fee forfeited. (e) If the Director determines that the application is complete, a public meeting and a public hearing will be scheduled. The public meeting must be held prior to the public hearing. (1) A public meeting will be scheduled approximately forty-five (45) days following the day the application was received; and (2) A public hearing of the city council will be scheduled approximately thirty (30) days following the public meeting. 34 Item 5. Sec. 13.2805 Notice of Public Meeting (a) Notice of the public meeting for an MSD application must include the date, time, and location of the public meeting, the identity of the applicant, the location and legal description of the designated property, the purpose of the MSD, the type of contamination identified in the groundwater of the area for which the MSD is sought, and a statement that a copy of the application is available for public viewing at the city secretary's office notice will be made as follows: (1) The Director will publish notice of a public meeting for a proposed MSD in the official newspaper of the city, or in a newspaper of general circulation, not less than fifteen (15) days before the public meeting; (2) The Director will provide written notice of a public meeting for a proposed MSD, not less than fifteen (15) days before the date of the public meeting by properly addressed and regular postage paid, in the United States mail. Notice will be mailed to: a. The applicant; b. Those on the list provided by the applicant pursuant to section 13-2803(b)(6); (b) The applicant is required to post at least one (1) sign-up on the area for which an MSD has been requested. The sign(s) must state that an MSD has been requested for the area and that additional information can be acquired by telephoning the number listed thereon or visiting the website address listed thereon. The erection and/or the continued maintenance of any such sign shall not be deemed a condition precedent to the holding of any public meeting or public hearing or any official action concerning the MSD application. Sec. 13.2806 Public Meeting (a) The purpose of a public meeting is for the applicant to present information to the affected community about the MSD process in general, the application specific to the property for which the MSD is being sought, and to obtain input from the affected community prior to formal action by the city council. (b) The applicant or its representative must appear at the public meeting. If the applicant fails to appear at the public meeting either in person or by a representative, the application shall be deemed withdrawn and the application fee forfeited. (c) The Director will facilitate the meeting, allowing the applicant or its representative the opportunity to present its reasons for requesting an MSD, and allowing members of the affected community the opportunity to ask the applicant questions or make oral comments on the application. Sec. 13.2807 City Council Public Hearing (a) Prior to the public hearing, the Director will provide the city council a copy of the application, and a written report summarizing the request for the MSD approval, any staff comments or concerns, and minutes of the public meeting. 35 Item 5. (b) The applicant or its representative must appear at the public hearing and present the request for MSD approval. If the applicant fails to appear at the public hearing, the application shall be deemed withdrawn and the application fee forfeited. (c) Persons wishing to speak either in favor of or against the application will be provided the opportunity by city council guidelines for public hearings. (d) Following the conclusion of the public hearing, the city council may approve, conditionally approve, disapprove, or postpone action on the application to a future date. If approving an application, the city council shall: (1) Approve a municipal setting designation ordinance supporting the application to be presented to the TCEQ, and prohibiting the use of designated groundwater from beneath the designated property; and (2) Include in the ordinance other reasonable restrictions, including, but not limited to specification of underground construction materials to be used in the designated property. (e) City council approval of an application shall not be deemed to waive the city's right to comment on an MSD application that has been filed with the executive director of the TCEQ. Sec. 13.2808 Limitation on Reapplication If after a public hearing the city council disapproves an application, or if the applicant has withdrawn its application after public notice has been issued, no new MSD applications for the proposed designated property shall be accepted by the city or scheduled for a public hearing by the city council within a period of twelve (12) months of the date of disapproval or withdrawal. Sec. 13.2809 Additional Provisions, Enforcement, and Penalties (a) A person who has received approval of an MSD from the city, shall, upon issuance from the TCEQ, provide the Director with a copy of the certificate of completion or other documentation issued for the MSD area, showing that response actions, if required, have been completed. (b) The applicant shall execute, deliver and file, no later than thirty (30) days from the date of the TCEQ's certification, in the official real property records of Denton County, Texas, a deed restriction approved as to form by the City Attorney prohibiting the drilling of wells and the use of designated groundwater for any purpose, including but not limited to any potable purpose, and excepting only: (i) wells used as monitoring wells for the collection of groundwater samples for chemical or biological laboratory analyses; and (ii) wells used for remediation of soil or groundwater contamination. (c) A file-stamped and recorded copy of said deed restriction shall be delivered to the city attorney's office and the Director's office within three (3) business days after the date of filing. The deed restriction shall be enforceable by the City of Sanger and may be amended or terminated only with the prior written consent of the City of Sanger after at least thirty (30) days prior written notice to the TCEQ of any pending amendment or termination. 36 Item 5. (d) A person commits an offense if they fail to provide the City Attorney and the Director with the documentation required in this section within the specified time frames. (e) A person commits an offense if the person intentionally, knowingly, or with criminal negligence uses groundwater in a designated property for a purpose prohibited in the municipal setting designation ordinance. (f) Any person who violates any provision of this article shall, upon conviction, be punished by a fine not to exceed two thousand dollars ($2,000.00). Each day that one or more provisions in this article are violated shall be considered a separate offense. (g) The City Attorney is authorized to commence an action for appropriate legal or equitable relief in a court of competent jurisdiction in addition to the penalty mentioned in the above subsection (f). Such additional relief may include a civil fine of up to one thousand dollars ($1,000.00) per day for violations of sections 13-2808, and all other damages, costs, remedies, and legal processes to which the city may be entitled. (h) This article shall be and is hereby declared to be cumulative of all other ordinances of the City of Sanger, and this article shall not operate to repeal or affect any of such other ordinances except insofar as the provisions thereof might be inconsistent or in conflict with the provisions of this article, in which event such conflicting provisions, if any, in such other ordinance or ordinances are hereby repealed. (i) All of the regulations provided in this article are hereby declared to be governmental and for the health, safety, and welfare of the general public. Any member of the city council or any city official or employee charged with the enforcement of this article, acting for the City of Sanger in the discharge of his/her duties, shall not thereby render himself/herself personally liable; and he/she is hereby relieved from all personal liability for any damage that might accrue to persons or property as a result of any act required or permitted in the discharge of his/her said duties. 37 Item 5. CITY COUNCIL COMMUNICATION DATE: March 6, 2023 FROM: Ramie Hammonds, Development Services Director AGENDA ITEM: Consideration and possible action on a request for the Replat of Lot 2, of the IESI Industrial Park, being 2.993 acres located within the City of Sanger. Generally located along the north side of Utility Road approximately 1464 feet east of the intersection of North Stemmons Frwy and Utility Road. SUMMARY:  The applicant is proposing to create 1 industrial lot of 2.993 acres, from 1 previously platted tract.  The site is zoned Industrial 1  The applicant is proposing to create warehouses on the site.  Lot 2-R has approximately 461 feet of frontage on Utility Road.  There was no right-of-way dedication required.  The replat will establish all easements required to make the site a developable site.  Staff mailed out 9 notices and at the time of this report has not received any responses.  The property is located in the City of Sanger.  The Planning and Zoning Commission recommend APPROVAL on 2-13-23 with the condition all comments were satisfied prior to City Council. FISCAL INFORMATION: Budgeted: N/A Amount: N/A GL Account: N/A RECOMMENDED MOTION OR ACTION: Staff recommends DENIAL based on the condition attached comments have not been satisfied. ATTACHMENTS: Location Map Final Plat Application Letter of Intent Engineering Comments Planning Comments 38 Item 6. UTILITY RD 900UTILITY RD 902UTILITY RD /Project Name: IESI Industr ial ParkReplatProject: 23SANZO N-0002 0 250 500125 Fe et DISCLA IMER:This map wa s g en e ra te d by GI S da ta p ro vid edby the S a ng er GIS De pa rtme nt . Th e City o f Sanger do es n ot gu a ra n te e the c orrec tne ss oraccuracy o f a n y fe a tu re s o n th is ma p. Th ese ma pproducts are fo r illust ra tio n pu rpo se s o n ly an dare not suit ab le fo r site -s pe cific d e cision ma king .GIS dat a is su bje ct to co nst an t cha n ge s, an dmay not b e co mple te , a ccu rat e o r cu rren t.Date: 1/22 /2 02 3 4 :0 5:4 8 P MDoc Name : 2 3 SA NZON-0 00 2 _IE S I I nd us tria l P ark Rep latCity L imi ts Exhi bi ts SubjectArea 39 Item 6. LOT 2-R IESI INDUSTRIAL PARK 2.993 ACRES 130,382 SQUARE FEET LOT 1 IESI INDUSTRIAL PARK CABINET U, SLIDE 75, P.R.D.C.T. LOT 1, BLOCK A AUSTIN ADDITION CABINET W, SLIDE 353 P.R.D.C.T. TRACT 5 REDI-MIX, INC VOL. 93, PAGE 48556 D.R.D.C.T. UTILITY ROAD (60' ROW PER VOL. 1135, PG. 939, D.R.D.C.T.) (REMAINDER) EAGLE FARMS INC. VOL. 971, PAGE 2 D.R.D.C.T. N88°42'08"W 461.51' N 0 1 ° 1 7 ' 5 2 " E 2 9 0 . 2 0 ' S88°38'21"E 437.83' S 0 3 ° 2 2 ' 2 7 " E 2 9 0 . 6 8 ' N88°42'08"W 40.14' B U R L I N G T O N N O R T H E R N S A N T A F E R A I L R O A D ( 1 0 0 ' R O W A S S H O W N O N C A B I N E T U , S L I D E 7 5 , P . R . D . C . T . ) ED AUSTIN FAMILY TRUST AND THE AUSTIN TRUST VOL. 2019, PG. 82956 D.R.D.C.T. D D D D FINAL PLAT LOT 2-R, IESI INDUSTRIAL PARK BEING A REPLAT OF LOT 2, IESI INDUSTRIAL PARK AN ADDITION IN THE CITY OF SANGER ACCORDING TO THE PLAT RECORDED UNDER CABINET U, SLIDE 75, P.R.D.C.T. 1 LOT | 2.993 ACRES OUT OF THE R. BEBEE SURVEY, ABSTRACT #29 CITY OF SANGER, DENTON COUNTY, TEXAS PREPARED DECEMBER, 2022 VICINITY MAP - NOT TO SCALE SITE PRELIMINARY THIS DOCUMENT SHALL NOT BE RECORDED FOR ANY PURPOSE AND SHALL NOT BE USED, VIEWED, OR RELIED UPON AS A FINAL SURVEY DOCUMENT December 15, 2022 POINT OF BEGINNING LEGEND OF ABBREVIATIONS ·D.R.D.C.T. DEED RECORDS, DENTON COUNTY, TEXAS ·P.R.D.C.T.PLAT RECORDS, DENTON COUNTY, TEXAS ·O.P.R.D.C.T.OFFICIAL PUBLIC RECORDS, DENTON COUNTY, TEXAS ·DOC.#DOCUMENT NUMBER ·C.M.CONTROLLING MONUMENT ·SQ. FT.SQUARE FEET ·ROW RIGHT OF WAY ·CRS CAPPED REBAR SET SHEET: Z:\Project Data\Survey\001 - Kirkman Engineering\2020\167 - Sanger Property\Drawings SURVEYOR'S NOTES: 1.Bearings are based on the State Plane Coordinate System, Texas North Central Zone (4202) North American Datum of 1983 (NAD '83), distances are surface with a combined scale factor of 1.00015063. 2.This property lies within Zone "X" of the Flood Insurance Rate Map for Denton County, Texas and Incorporated Areas, map no. 48121C0070G, with an effective date of April 18, 2011, via scaled map location and graphic plotting. 3.Monuments are found unless specifically designated as set. 4.Elevations (if shown) are North American Vertical Datum of 1988 (NAVD '88). SURVEYOR BARTON CHAPA SURVEYING 5200 State Highway 121 Colleyville, TX 76034 Phone: 817-864-1957 info@bcsdfw.com TBPLS Firm #10194474 5200 State Highway 121 Colleyville, TX 76034 Phone: 817-488-4960 DRAWN:BCS CHECKED:JHB TABLE OF REVISIONS DATE SUMMARY JOB NO.2020.001.167 SCALE: 1" = 30' 30'0 15'30'60' STATE OF TEXAS § COUNTY OF DENTON § WHEREAS PENTHOUSE SPEEDWAY CONDO, LLC is the owner of that tract of land out of the R. Bebee Survey, Abstract Number 29, in the City of Sanger, Denton County, Texas, and being all of Lot 2 of IESI Industrial Park, an addition in the City of Sanger, Denton County, Texas, according to the plat recorded under Cabinet U, Slide 75, Plat Records, Denton County, Texas, (P.R.D.C.T.), said Lot 2 being conveyed by deed to Penthouse Speedway Condo, LLC as recorded under Document Number 2020-190468, Official Public Records, Denton County, Texas, (O.P.R.D.C.T.), the subject tract being more particularly described by metes and bounds as follows (bearings are based on State Plane Coordinate System, Texas North Central Zone (4202) North American Datum of 1983 (NAD '83)): BEGINNING at a 1/2 inch rebar with cap stamped, “EAGLE SURVEYING” found for the northwest corner of said Lot 2 and the herein described tract; THENCE with the perimeter and to the corners of said Lot 2, the following calls: 1.South 88 degrees 38 minutes 21 seconds East, a distance of 437.83 feet to a 1/2 inch rebar with cap stamped, “EAGLE SURVEYING” found; 2.South 03 degrees 22 minutes 27 seconds East, a distance of 290.68 feet to a 1/2 inch rebar with cap stamped, “HAT-2901” found; 3.North 88 degrees 42 minutes 08 seconds West, a distance of 461.51 feet to a 1/2 inch rebar found; 4.North 01 degrees 17 minutes 52 seconds East, a distance of 290.20 feet, returning to the POINT OF BEGINNING and enclosing 2.993 acres (130,328 square feet) of land, more or less. STATE OF TEXAS § COUNTY OF ______________§ NOW, THEREFORE, KNOW ALL MEN BY THESE PRESENTS THAT, PENTHOUSE SPEEDWAY CONDO, LLC, acting herein by and through its duly authorized officer, does hereby adopt this plat designating the hereinabove described property as (lot/block/subdivision), an addition to the City of Sanger, Texas, and does hereby dedicate to the public use forever by fee simple title, free and clear of all liens and encumbrances, all streets, thoroughfares, alleys, fire lanes, drive aisles, parks, and watercourses, and to the public use forever easements for sidewalks, storm drainage facilities, utilities and any other property necessary to serve the plat and to implement the requirements of the subdivision regulations and other City codes and do hereby bind ourselves, our heirs, successors and assigns to warrant and to forever defend the title on the land so dedicated. Further, the undersigned covenants and agrees that he/she shall maintain all easements and facilities in a state of good repair and functional condition at all times in accordance with City codes and regulations. No buildings, fences, trees, shrubs, or other improvements or growths shall be constructed or placed upon, over, or across the easements as shown, except that landscape improvements may be installed, if approved by the City of Sanger. The City of Sanger and public utility entities shall have the right to access and maintain all respective easements without the necessity at any time of procuring permission from anyone. WITNESS my hand this the ______ day of ____________________ 20___ ___________________________________ PENTHOUSE SPEEDWAY CONDO, LLC, Owner (Authorized Agent) STATE OF TEXAS § COUNTY OF _______________§ BEFORE ME, the undersigned, a Notary Public in and for the State of Texas, on this day personally appeared_________________, known to me to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that he executed the same as for the purpose and consideration therein expressed, and in the capacity therein stated. _____________________ Notary Public in and for the State of Texas SURVEYOR'S CERTIFICATE STATE OF TEXAS § COUNTY OF TARRANT § I, John H. Barton III, a Registered Professional Land Surveyor of the State of Texas, do hereby certify that the map shown hereon accurately represents the described property as determined by a survey made on the ground under my direction and supervision. Date of Plat/Map: December 15, 2022 _______________________________________________________ John H. Barton III, RPLS# 6737 Date STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned, a Notary Public in and for the State of Texas, on this day personally appeared _______________________, known to me to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that he/she executed the same as for the purpose and consideration therein expressed, and in the capacity therein stated. _____________________ Notary Public in and for the State of Texas OWNER PENTHOUSE SPEEDWAY CONDO, LLC 1920 E. S.H. 114 SOUTHLAKE, TX 76092 ENGINEERPLAT NOTES: 1.All lots comply with the minimum size requirements of the zoning district. 2.This property may be subject to charges related to impact fees and the applicant should contact the City regarding any applicable fees due. 3.All common areas, drainage easements, and detention facilities will be owned and maintained by the HOA/POA. Any common area within the City’s right-of-way will require a facilities agreement, to be reviewed and approved by the City. 4.Notice – selling a portion of this addition by metes and bounds is a violation of City ordinance and State Law and is subject to fines and withholding of utilities and building permits. 5.This plat does not alter or remove existing deed restrictions, if any, on this property. 6.Minimum finished floor elevations are at least 2 feet above the 100 year flood plain. 7.The purpose of this replat is to dedicate easements within existing Lot 2. 40 Item 6. City of Sanger 201 Bolivar / P.O Box 1729 Sanger, TX 76266 940-458-2059 (office) www.sangertexas.org Effective Date: 02/11/2020 201 Bolivar Street/PO Box 1729 * Sanger, TX 76266 940-458-2059(office) www.sangertexas.org SUBDIVISION APPLICATION Preliminary Plat Minor Plat Final Plat/Replat Amended Plat Vacating Plat Conveyance Plat Applicant Owner (if different from applicant) Name: Name: Company: Company: Address: Address City, State, Zip: City, State, Zip: Phone Phone: Fax: Fax: Email: Email: Submittal Checklist Pre-Application Conference (Date: / / ) One (1) Paper Copy of Plat (24”x36”, folded to 1/4 size) Letter of Intent Non-Refundable Application Fee (Check Payable to City of Sanger) Application Form (Signed by Owner) Applicable Plat Checklist (Completed) Additional Required Documents/Traffic & Drainage Studies etc. One (1) PDF Copy of all Documents Provided on a CD/DVD or Emailed to development@sangertexas.org Supporting Materials (List if provided): R Number(s): Owner’s Signature Date Applicant’s Signature Date Office Use: Reviewed by Director of Development Services / / X Kyle McCage Kirkman Engineering 5200 State Highway 121 Colleyville, TX 76034 817-488-4960 n/a kyle.mccage@trustke.com x 02 2021 x x x x x x Civil construction plans are under review as Sanger Industrial Addition 12/20/22 Penthouse Speedway Condo, LLC 1920 E State Highway 114 Southlake, TX 76092 Clint Cox 469-628-6587 n/a clint.cox@siskcapital.com 12/22/2022 41 Item 6. City of Sanger 201 Bolivar / P.O Box 1729 Sanger, TX 76266 940-458-2059 (office) www.sangertexas.org Effective Date: 02/11/2020 201 Bolivar Street/PO Box 1729 * Sanger, TX 76266 940-458-2059(office) www.sangertexas.org SUBDIVISION PACKET A Plat subdividing land within the city limits of Sanger or within Sanger Extraterritorial Jurisdiction (ETJ) requires the approval of the City of Sanger. The platting process involves the preparation of one or more plats by the landowner, a review by staff, and consideration by the Planning & Zoning Commission and City Council. PLAT TYPES: There are seven different types of plats, each with their own function. • Preliminary Plat – A preliminary plat is required for most subdivisions, particularly those providing for dedication of public right-of-way and construction of public improvements. It is used to determine the layout of the proposed development. • Final Plat – A final plat will follow a preliminary plat to specify in detail the arrangement of lots, the dedication of public right-of-way, and the provision of public improvements and services. • Replat – A replat revises an existing plat and is controlling over the preceding plat. A public hearing is required for replat. • Minor Plat – A minor plat is one creating three lots or fewer, and not requiring the dedication of right-of-way or construction of improvements. Minor plats can be approved with the preparation of a preliminary plat. • Amended Plat – An amended plat revises a previously platted lot to correct an error or add or modify a feature. Amending plats cannot increase the number of lots. • Conveyance Plat – A conveyance plat may be used to convey the property or interests therein. It may also be used in lieu of a final plat to record a subdivision or property. A conveyance plat is an interim step in the subdivision of land and shall contain a notation that indicates that no development is intended. • Vacating Plat – A vacating plat removes/vacates the plat covering a tract of land before any lot in the plat is sold. The plat is vacated when a signed, acknowledged instrument declaring the plat vacated is approved and recorded in the manner prescribed for the original plat. SUBMISSION REQUIREMENTS: The submittal requirements for each kind of plat are included in this packet. SUBMISSION SCHEDULE: Plats must be submitted during regular business hours before the submittal cut- off date for each Planning and Zoning (P&Z) Commission meeting. Before the application is filed, a mandatory completeness check is required. Application are encouraged to be submitted at least 9 days prior to the submittal cut-off date for completeness check. Plat will be scheduled for P&Z Commission and for City Council according to The Schedule for Planning Applications on the City’s website. Staff will provide review comments within 2 weeks of application filing. All corrections must be made prior to the P&Z Commission meeting. If more time is needed for revisions/corrections, the applicant and owner must submit a request in the form of a signed letter a week before the P&Z meeting date. Staff may extend the application review time for up to 25 days upon receipt of the signed letter. 42 Item 6. City of Sanger 201 Bolivar / P.O Box 1729 Sanger, TX 76266 940-458-2059 (office) www.sangertexas.org Effective Date: 02/11/2020 201 Bolivar Street/PO Box 1729 * Sanger, TX 76266 940-458-2059(office) www.sangertexas.org APPLICATION FEES: The non-refundable application fee covers part of the cost for the city to review and act on the plat application. • Residential Preliminary or Final Plat / Replat  $400.00 + $6.00 per lot < 10  $500.00 + $10.00 per lot > 10  $500.00 + $15.00/acre for plats with lot sizes of one acre or more • Commercial Preliminary or Final Plat / Replat  Less than five (5) acres - $500.00 + $15.00 per acre  Five (5) acres to less than 25 acres - $600.00 + $15.00 per acre  25 acres to less than 100 acres - $950.00  100 acres or more - $950.00 + $5.00 per acre • Minor Plat - $400.00 + $3.00 per lot, or $15.00 per acre for lots larger than 1 acre • Amended Plat - $200.00 + $3.00 per lot • Conveyance Plat - $200.00 +$3.00 per lot • Vacating Plat - $200.00 SUBDIVISION PROCEDURE The process for subdividing land involved the following steps: 1. Pre-Application Conference: Prior to filing of a plat, the owner must consult with the Director of Development Services, and other City staff concerning compliance with all applicable ordinances and regulations, and the provision of adequate infrastructure and public services. Also, the applicable application review and approval procedure for the plat will be identified. 2. Completeness Check: The applicant will provide all required documents and fees along with the signed application and applicable checklist for a completeness check 9 days prior to the submittal cut-off date. Staff will review the documents for completeness of items listed on the checklists and provide feedback about any additional information or documents required from the applicant. Applications deemed to be incomplete at the time of submittal cut-off date will be returned to the applicant without the application being filed. 3. Submission: Upon determination of application completeness, the application will be considered filed with the Development Services Department. The application submittal cut-off date will be considered as the application filing date and as the first day of review of application. 4. Review: City Staff will review the plat for compliance with the Subdivision Ordinance and other city requirements, and provide comments within 2 weeks of application submittal. The applicant may need to make changes and revisions to the plat or supporting materials. The applicant must provide additional copies of the plat if requested by staff prior to the P&Z Commission and City Council meetings. 43 Item 6. City of Sanger 201 Bolivar / P.O Box 1729 Sanger, TX 76266 940-458-2059 (office) www.sangertexas.org Effective Date: 02/11/2020 201 Bolivar Street/PO Box 1729 * Sanger, TX 76266 940-458-2059(office) www.sangertexas.org 5. Planning & Zoning Commission: The Planning & Zoning Commission will consider the plat at a regular meeting. The meeting date will be determined at the time of application filing. Staff will recommend approval of the project only if all of staff’s comments have been addressed prior to P&Z meeting. If the plat is approved, it will be forwarded to the City Council. If the plat is denied, applicant may resubmit a response addressing all of staff’s comments prior to City Council meeting date. 6. City Council: The City Council will consider the plat at a regular meeting. The meeting date will be determined at the time of application filing. Staff will recommend approval of the project only if all of staff’s comments have been addressed prior to City Council meeting. City Council’s action will be final. If the plat is denied, staff will provide written statement with specific reasons for disapproval. The applicant may resubmit a response satisfying all reasons for disapproval. Upon resubmittal of the applicant’s response, City will have 15 days to either approve or deny the plat. If plat is denied again, the applicant will be required to start a new application. If approved, applicant may schedule a pre-construction meeting with City staff. 7. Filing for Recordation: Following approval by the City Council, and construction and acceptance of any required public improvements, the plat will be signed by the P&Z Chairman, Mayor, sealed by the City Secretary, and filed for record with Denton County. A Plat Execution Package containing the following must be provided to the Development Services to file the plat for record with Denton County: a. three (3) full-sized (24”x36”) notarized copies of the plat with all signatures (except P&Z Chairman, Mayor and City Secretary), seals, stamps or other validation/certifications of work as applicable in accordance with State law and local requirements, folded to 8.5”x11” with the title block facing outwards; b. recent original certified & sealed tax certificates showing $0.00 amount due; c. $100.00 plat filing fee; Note: Preliminary Plats are not filed for record Consult the Schedule of Planning Application for submittal dates and corresponding meeting dates of the Planning & Zoning Commission and City Council. 44 Item 6. City of Sanger 201 Bolivar / P.O Box 1729 Sanger, TX 76266 940-458-2059 (office) www.sangertexas.org Effective Date: 02/11/2020 201 Bolivar Street/PO Box 1729 * Sanger, TX 76266 940-458-2059(office) www.sangertexas.org SUBMITTAL REQUIREMENTS & PROCESS All plat submittals must include the correct copies of the plat, the completed and signed application form, plat checklist, the application fee, and a Letter of Intent. Some plats may also require additional copies of the plat and/or other supplementary materials. The Pre-Application Conference with city staff will determine the specific submittal requirements for each applicant. PLAT: The applicant must provide one (1) copy of the plat, printed on a 24”x36” paper, folded to one quarter that size, along a pdf copy of the plat provided on a CD/DVD or emailed to development@sangertexas.org. Additional copies of the plat may be required for staff, depending on the nature of the plat. Additional copies may be required prior to the Planning & Zoning Commission and City Council meetings. APPLICATION FORM: The application form must be completed and signed by the owner(s). PLAT CHECKLIST: Each item on the applicable plat checklist must be check marked as completed and submitted along with the application form. APPLICATION FEE: The required application fee must be provided by check made payable to the City of Sanger. If the submittal is complete, the payment will be accepted. If the submittal is incomplete, the check will be returned with the other materials. LETTER OF INTENT: Each plat submittal must include a Letter of Intent which provides the following: • The subdivider’s name and address • The contact information of the person(s) preparing the submitted documents • The designated point of contact for future correspondence • The intent of the plat application • A brief description of the location, land area, particulars as to the intended use(s) of the property, and any intended future development on the property • A request that the plat be reviewed and considered by the appropriate approval body SUBMITTAL PROCESS: The applicant shall submit the plat application to the Department of Development Services as indicated by the Schedule of Planning Application. A plat application submittal is accepted by the City when the Director of Development Services has certified to the applicant that a complete submittal providing adequate information for a comprehensive review has been received. No plat application will be considered submitted with the city until and unless the prescribed application fees have been paid. All original plat application documents must be submitted to the Department of Development Services, as well as emailed to development@sangertexas.org. 45 Item 6. City of Sanger 201 Bolivar / P.O Box 1729 Sanger, TX 76266 940-458-2059 (office) www.sangertexas.org Effective Date: 02/11/2020 201 Bolivar Street/PO Box 1729 * Sanger, TX 76266 940-458-2059(office) www.sangertexas.org PRELIMINARY PLAT CHECKLIST The plat shall be drawn to a scale of not more than two hundred feet to the inch (1” = 200’). The information to be included and the procedure for submittal are as follows:  Legal Description (Metes and Bounds) with total acreage  Describe and locate all permanent survey monument, pins, and control points and tie and reference the survey corners at two points to the Texas State Plane Coordinate System North Central Zone 1983- 1999 datum. The Point of Beginning (POB) shall be clearly marked including State Plane Coordinates, NAD 83.  An accurate location of at least two (2) corners of the subdivision with reference to original corners of the original survey of which the subdivision is a part or an existing permanent monument to an approved and recorded plat or permanent markers established by and approved by the City Engineer.  North Arrow  Scale (both graphic and written) appropriate for the level of detail and not more than two hundred feet to the inch (1”=200)  Legend for any symbols used  Location/Vicinity Map showing the location of the subject property, existing and proposed streets and thoroughfares covering an area at least one thousand feet (1,000’) outside the proposed subdivision.  Title Block with the following information: 1) Plat Type (ex: “Final Plat”, “Preliminary Plat”, etc.) 2) Name of the proposed development/addition 3) Total number of lots and HOA/Open Space lots 4) Survey name and abstract number 5) Gross acreage 6) Right-of-Way acreage, if dedicated 7) Date of preparation and subsequent revisions  Block with name(s), address, phone number, and email of preparer, owner, developer, engineer, and/or surveyor 46 Item 6. City of Sanger 201 Bolivar / P.O Box 1729 Sanger, TX 76266 940-458-2059 (office) www.sangertexas.org Effective Date: 02/11/2020 201 Bolivar Street/PO Box 1729 * Sanger, TX 76266 940-458-2059(office) www.sangertexas.org  Existing Features: 1) Location and dimension of all boundary lines (accurate in scale) with dimensions and bearings including lot lines, building lines, and City Limits lines (if any). 2) The location, widths, and names of all existing or platted streets or other public areas, parks, existing permanent structures, land dedicated within or contiguous to the subject property, railroads, rights-of-way, easements, and other important features, such as abstract lines, political subdivision or corporation lines, and school district boundaries. 3) Existing sewer mains, water mains, drainage culverts or other underground structures within the tract and immediately adjacent thereto with pipe sizes, grades, locations and dimensions indicated. 4) Contours with intervals of two feet (2’) or less, referred to mean sea level datum. In areas where the terrain is relatively flat, supplementary contours shall be shown so that the average horizontal distance between said lines does not exceed two hundred feet (200’). 5) Subdivision name of adjacent properties (P.R.D.C.T) or ownership information for adjacent un-platted properties (D.R.D.C.T.) with recording information. 6) Location of existing fire hydrants and fire lanes PRELIMINARY PLAT CHECKLIST (cont.)  New Features: 1) The layout, names, and widths (from centerline to edge as well as from edge to edge) of the proposed streets, fire lanes, drives, alleys and easements. 2) Length and radii of all street segments 3) Curve table for all streets, drives, and alleys 4) Acreage or square footage of right-of-way dedicated should be shown, including corner clips and deceleration/turn lanes on the plat 5) Lot and block numbers (lot number are numbers; and block numbers are letters), square footage, and other description according to the real estate records of the city or county auditor and recorder; also, designation of the proposed uses of land within the subdivision. 6) All parcels of land intended to be dedicated for public use or reserved in the deeds for the use of all property owner(s) in the proposed subdivision, together with the purpose or limitations of such reservations. 7) The layout, numbers, set-back lines, and approximate dimensions of proposed lots, blocks, parks, etc. 8) Location of proposed fire hydrants and fire lanes 9) USPS Postmaster approved location of mailboxes (if cluster mailboxes) 10) Proposed building lines with square footage and proposed use 11) Proposed Parking layout  Table showing the following information: 1) Listing of the lots with square footage, and the associated lot widths at the front building line 2) Square footage of total building footprint and of each land use (if known) 3) Number of required and provided parking spaces 4) Required and provided total landscaped area and front yard landscaped area 47 Item 6. City of Sanger 201 Bolivar / P.O Box 1729 Sanger, TX 76266 940-458-2059 (office) www.sangertexas.org Effective Date: 02/11/2020 201 Bolivar Street/PO Box 1729 * Sanger, TX 76266 940-458-2059(office) www.sangertexas.org  Existing and proposed FEMA 100-year floodplain boundaries and elevation. Include minimum finished floor elevations (minimum 2 feet above the 100-year elevation) of all lots adjacent to floodplain. If the site does not contain a floodplain, note that: “No 100-year floodplain exists on the site.” A Floodplain reclamation study will be required with Final Plat if necessary.  Submittals for preliminary plats shall include plans, documents, and information adequate for the review of the provision of public improvements to the properties involved. This includes but is not limited to streets, water services, wastewater services, franchise utilities, street lighting, and stormwater detention (ex: preliminary drainage plans, preliminary utility plans, floodplain study, traffic impact study etc.).  Two (2) copies of the typical cross-sections of proposed streets showing the width of pavement, type of pavement, and location and widths of sidewalks when not in conformance with standard details.  Approval Block: The following notice shall be placed on the face of each preliminary plat by the subdivider: “Preliminary Plat for Review Purposes Only” The following certificates shall be placed on the preliminary plat by the subdivider: Approved for Preparation of Final Plat City of Sanger, TX Date Planning & Zoning Commission 48 Item 6. City of Sanger 201 Bolivar / P.O Box 1729 Sanger, TX 76266 940-458-2059 (office) www.sangertexas.org Effective Date: 02/11/2020 201 Bolivar Street/PO Box 1729 * Sanger, TX 76266 940-458-2059(office) www.sangertexas.org FINAL, REPLAT, MINOR, AMENDED, AND CONVEYANCE PLAT CHECKLIST  The Plat shall be drawn to a scale of not more than two hundred feet to the inch (1” = 200’).  The boundary marked with heavy weighted lines with accurate distances and bearings, a metes and bounds description of the boundary (error of closure shall not exceed one (a) in fifty thousand (50,000) for the plat boundary), exact acreage to hundredths, and the exact location and width of all existing or recorded rights-of-way intersecting the boundary of or bordering on the tract. One (1) copy of the traverse closure sheet shall be enclosed.  True bearings and distances to the nearest established street lines, official monuments or subdivision corner, which shall be accurately described on the plat. Municipal, township, county or abstract survey lines shall be accurately tied to the lines of the subdivision by the distances and bearings, where applicable.  Describe and locate all permanent survey monument, pins, and control points and tie and reference the survey corners at two points to the Texas State Plane Coordinate System North Central Zone 1983- 1999 datum. The Point of Beginning (POB) shall be clearly marked including State Plane Coordinates, NAD 83.  An accurate location of at least two (2) corners of the subdivision with reference to original corners of the original survey of which the subdivision is a part or an existing permanent monument to an approved and recorded plat or permanent markers established by and approved by the City Engineer.  Subdivision name of adjacent properties (P.R.D.C.T) or ownership information for adjacent unplatted properties (D.R.D.C.T.) with recording information.  An accurate location of the subdivision in reference to the deed records of the county which shall include the volume and page of the deed of the property to be subdivided.  If the property owner information does not match the Denton Central Appraisal District record, then information related to the purchase must be provided.  The exact layout, including: 1) Street and/or alley names 2) The length of all arcs, radii, internal angles and points of curvature, length and bearing of the tangents 3) All existing and proposed easements for right-of-way, public services, utilities or any other easements and any limitations of the easements 4) Show centerline of existing streets. Dimensions from centerline to edges of existing and proposed right-of-way on both sides of the centerline. 5) All lot number and lines, with accurate dimensions in feet and hundredths and with bearings and angles to street and alley lines to the nearest second  The accurate location, material, and approximate size of all monuments. 49 Item 6. City of Sanger 201 Bolivar / P.O Box 1729 Sanger, TX 76266 940-458-2059 (office) www.sangertexas.org Effective Date: 02/11/2020 201 Bolivar Street/PO Box 1729 * Sanger, TX 76266 940-458-2059(office) www.sangertexas.org The accurate outline description of all property which is offered for dedication for public use, such as parks, etc., with the purpose indicated thereon, and all property that may be reserved by deed covenant for the common use of the property owners in the subdivision. A signed and notarized copy of private restriction (if any), that are filed for record in the office of the County Clerk shall be provided with the Final Plat. Name and addresses of the owner, subdivider, engineer, and surveyor. FINAL, REPLAT, MINOR, AMENDED, AND CONVEYANCE PLAT CHECKLIST (cont.) North point, written and graphic scale, and date. 3”x3” recording box at the lower right hand corner. A Title Block with the following information shall be provided on each page: 1)Plat Type (ex: “Final Plat”, “Preliminary Plat”, etc.) 2)Name of the proposed development/addition/subdivision 3)Total number of lots and HOA/Open Space lots 4)Survey name and abstract number 5)Gross acreage 6)Right-of-Way acreage, if dedicated 7)Date of preparation and subsequent revisions Standard Notation to be added on the plat: 1)“All lots comply with the minimum size requirements of the zoning district.” 2)“This property may be subject to charges related to impact fees and the applicant should contact the City regarding any applicable fees due.” 3)“All common areas, drainage easements, and detention facilities will be owned and maintained by the HOA/POA. Any common area within the City’s right-of-way will require a facilities agreement, to be reviewed and approved by the City.” 4)“Notice – selling a portion of this addition by metes and bounds is a violation of City ordinance and State Law and is subject to fines and withholding of utilities and building permits.” 5)“This plat does not alter or remove existing deed restrictions, if any, on this property.” 6)“Minimum finished floor elevations are at least 2 feet above the 100 year flood plain.” 7)“The subject property does not lie within a 100 – year floodplain according to Community Panel No. , dated , of the National Flood Insurance Rate Maps for Denton County, Texas.” 8)“The purpose of this plat is [state the purpose] ” 9)“Bearings are based on the State Plane Coordinate System, Texas North Central Zone (4202), North American Datum of 1983 (NAD ‘83)” 50 Item 6. City of Sanger 201 Bolivar / P.O Box 1729 Sanger, TX 76266 940-458-2059 (office) www.sangertexas.org Effective Date: 02/11/2020 201 Bolivar Street/PO Box 1729 * Sanger, TX 76266 940-458-2059(office) www.sangertexas.org The name, address and phone number of all utilities providing service to the development is required. A signature from each provider or a will-serve letter, signifying their ability to provide service to the subdivision is required. Location map showing existing and proposed streets and thoroughfares covering an area at least one thousand feet (1000’) outside the proposed subdivision. One paper copy (24”x36”) and one soft copy (pdf) of approved civil/construction plans, along with GIS/CAD files for all approved public improvements on a CD/DVD. For Conveyance Plats Only: All conveyance plats must be titled “Conveyance Plat” and carry the following text: “A conveyance plat is a record of property approved by the City of Sanger for the purpose of sale or conveyance in its entirety or interests thereon defined. No building permit may be issued, nor development begin, nor permanent public utility service provided until a final plat is approved, filed of record and public improvements are accepted in accordance with the City of Sanger Code of Ordinances. Selling a portion of this property by metes and bounds, except as shown on an approved, filed and accepted conveyance plat, final plat or replat is a violation of the state law.” 51 Item 6. City of Sanger 201 Bolivar / P.O Box 1729 Sanger, TX 76266 940-458-2059 (office) www.sangertexas.org Effective Date: 02/11/2020 201 Bolivar Street/PO Box 1729 * Sanger, TX 76266 940-458-2059(office) www.sangertexas.org FINAL, REPLAT, MINOR, AMENDED, AND CONVEYANCE PLAT CHECKLIST Certification by a registered public surveyor or licensed state land surveyor, registered in the State of Texas to the effect that the plat represents a survey made by him or under his direct supervision and that all monuments shown thereon have been verified and actually exist, and that their location, size, and material are correctly shown. Such surveyor’s certificate may be prepared as follows: “State of Texas County of Denton I hereby certify that this plat is true and correct and was prepared from an actual survey of the property made on the ground under my supervision. (Engineer or Surveyor’s Seal) Licensed Professional Engineer OR Registered Public Land Surveyor Texas R.P.L.S. No. Date” A certificate of ownership and dedication of all streets, alleys, parks, and playgrounds to public use forever, signed and acknowledged before a notary public, by the owner or authorized representative and lien holder of the land, and a complete and accurate description of the land subdivided and the streets dedicated. Such owner’s certificate may be prepared as follows: “State of Texas County of Denton I (we), the undersigned, owner(s) of the land shown on this plat within the area described by metes and bounds as follows: (Metes and Bounds Description of Boundary) NOW, THEREFORE, KNOW ALL PERSONS BY THESE PRESENTS: THAT , acting herein by and through its duly authorized officer, does hereby adopt this plat designating the hereinabove described property as (lot/block/subdivision), an addition to the City of Sanger, Texas, and does hereby dedicate to the public use forever by fee simple title, free and clear of all liens and encumbrances, all streets, thoroughfares, alleys, fire lanes, drive aisles, parks, and watercourses, and to the public use forever easements for sidewalks, storm drainage facilities, utilities and any other property necessary to serve the plat and to implement the requirements of the subdivision regulations and other City codes and do hereby bind ourselves, our heirs, successors and assigns to warrant and to forever defend the title on the land so dedicated. Further, the undersigned covenants and agrees that he/she shall maintain all easements and facilities in a state of good repair and functional condition at all times in accordance with City codes and regulations. No buildings, fences, trees, shrubs, or other improvements or growths shall be constructed or placed upon, over, or across the easements as shown, except that landscape improvements may be installed, if approved by the City of Sanger. The City of Sanger and public utility entities shall have the right to access and maintain all respective easements without the necessity at any time of procuring permission from anyone. WITNESS MY HAND this day of _, 20 . , Owner , Title and Company (if applicable)” 52 Item 6. City of Sanger 201 Bolivar / P.O Box 1729 Sanger, TX 76266 940-458-2059 (office) www.sangertexas.org Effective Date: 02/11/2020 201 Bolivar Street/PO Box 1729 * Sanger, TX 76266 940-458-2059(office) www.sangertexas.org FINAL, REPLAT, MINOR, AMENDED, AND CONVEYANCE PLAT CHECKLIST (cont.) “State of Texas County of Denton Before me, the undersigned authority, on this day personally appeared, known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same for the purposes and considerations therein expressed and in the capacity therein stated. Given under my hand and seal of office this day of , 20 . Notary Public in and for the State of Texas Type or Print Notary’s Name My Commission Expires .”  The following certificate shall be included on the plat in a manner that will allow the signatures of the designated officials and the affixing of the City Seal. “Approved and Accepted _ Chairman, Planning & Zoning Commission Dat e City of Sanger, TX Mayor Date City of Sanger, TX Attested by City Secretary Date City of Sanger, TX” 53 Item 6. City of Sanger 201 Bolivar / P.O Box 1729 Sanger, TX 76266 940-458-2059 (office) www.sangertexas.org Effective Date: 02/11/2020 201 Bolivar Street/PO Box 1729 * Sanger, TX 76266 940-458-2059(office) www.sangertexas.org VACATING PLAT CHECKLIST  A letter signed by the property owner(s) indicating their consent. If the property owner information does not match the Denton Central Appraisal District record, then information related to the purchase must be provided.  Current tax certificate(s) indicating all taxes for the subject property have been paid to the current year (available from Denton Central Appraisal District). Tax statements printed from the DCAD website (pdf) are acceptable in lieu of the original certificate(s). Original tax certificates shall be required for recording the plat at the County.  Letter of Intent that should include 1) Existing legal description (subdivision name, lot(s), block(s)); 2) Original legal description that will be resumed upon plat vacation; 3) Explain the location of all structures on the property. 4) The contact information of the person(s) preparing the submitted documents 5) The designated point of contact for future correspondence 6) The intent of the plat application 7) A request that the plat be reviewed and considered by the appropriate approval body  A signed and notarized affidavit filled out completely and accurately by the land owner for the type pf plat that is proposed to be vacated must be included.  A map(s) showing the location, size, use and arrangement of all buildings/structures showing height in stories and feet, total floor area, total square feet of ground area coverage of existing buildings which will remain, if any, and the location, designation and total area of all usable open space.  Vicinity Map 54 Item 6. KIRKMAN ENGINEERING :: 5200 State Highway 121, Colleyville, TX 76034 Ph: 817-488-4960 :: TBPE Firm #15874 Page 1 of 1 Kirkman Engineering 5200 State Highway 121 Colleyville, TX 76034 817.488.4960 December 20, 2022 City of Sanger Development Services 201 Bolivar St/PO Box 1729 Sanger, TX 76266 RE: Letter of Intent – Sanger Industrial Replat Subdivider’s Information: Penthouse Speedway Condo, LLC 1920 E State Highway 114 Southlake, TX 76092 Applicant and Contact: Kyle McCage, P.E., CFM Kirkman Engineering 5200 State Highway 121 Colleyville, TX 76034 817-488-4960 Kyle.mccage@trustke.com The intent of this plat application is to support a replat of Lot 2, IESI Industrial Park as recorded in Cabinet U, Slide 75, Plat Records, Denton County, Texas. The replat is necessary to add an on-site drainage easement and a firelane, access, and utility easement. This project is a 2.9-acre industrial development occurring on undeveloped land. It is a one phase development supporting 8 buildings ranging from 5,100 square feet to 6,000 square feet. Intended uses are consistent with the recently assigned Industrial (I-1) zoning category. In addition to the buildings are supporting utility infrastructure and concrete paving. It is requested that the replat be reviewed and considered by the appropriate approval body. Please contact me directly at 817-488-4960 if you have any questions. Sincerely, Kyle McCage, P.E., CFM 55 Item 6. 3803 Parkwood Blvd. Suite 800 Frisco, Texas 75034 (214) 618-4570 Fax (214) 739-0095 February 2, 2023 AVO 37449.004 Ms. Ramie Hammonds Development Services Director/Building Official City of Sanger 201 Bolivar Street P.O. Box 1729 Sanger, Texas 76266 Re: Utility Road – Re-plat First Review Dear Ms. Hammonds, Halff Associates, Inc. was requested by the City of Sanger to provide a first review of the Re-plat for the IESE industrial Park located at Utility Road and Burlington Northern Santa FE Railroad. The property is located within the City of Sanger limits. The plat was prepared by Barton Chapa Surveying and is dated December 2022. A preliminary review of the document was performed and the following comments apply: 1. Easements for detention ponds need to be shown and labeled. 2. Show private drainage easement for all channels 3. Show any additional DE for roadside ditches 4. Show Min FFE 5. Determine the 100-yr fully developed floodplain for ditch along the RR and verify if it reaches site (ie overflow across access road, etc) If it reaches site, provide a floodplain easement (floodplain +10' buffer). 6. Verify size of drainage easements along perimeter, it does not appear to contain flow. DE must extend beyond top of bank. 7. City will need to verify easement provided matches what is needed in the plans. Previous plans showed grading outside the property. 8. Show and label offsite DE by separate instrument for proposed swale. 9. Show appropriate setbacks. If you have any questions or need additional information, please do not hesitate to call me at (817) 764-7480. Sincerely, HALFF ASSOCIATES, INC. TBPELS Firm No. 312 Steven D. Templer, P.E. Attachments: Markups 56 Item 6. LOT 2-R IESI INDUSTRIAL PARK 2.993 ACRES 130,382 SQUARE FEET LOT 1 IESI INDUSTRIAL PARK CABINET U, SLIDE 75, P.R.D.C.T. LOT 1, BLOCK A AUSTIN ADDITION CABINET W, SLIDE 353 P.R.D.C.T. TRACT 5 REDI-MIX, INC VOL. 93, PAGE 48556 D.R.D.C.T. UTILITY ROAD (60' ROW PER VOL. 1135, PG. 939, D.R.D.C.T.) (REMAINDER) EAGLE FARMS INC. VOL. 971, PAGE 2 D.R.D.C.T. N88°42'08"W 461.51' N 0 1 ° 1 7 ' 5 2 " E 2 9 0 . 2 0 ' S88°38'21"E 437.83' S 0 3 ° 2 2 ' 2 7 " E 2 9 0 . 6 8 ' N88°42'08"W 40.14' B U R L I N G T O N N O R T H E R N S A N T A F E R A I L R O A D ( 1 0 0 ' R O W A S S H O W N O N C A B I N E T U , S L I D E 7 5 , P . R . D . C . T . ) ED AUSTIN FAMILY TRUST AND THE AUSTIN TRUST VOL. 2019, PG. 82956 D.R.D.C.T. D D D D FINAL PLAT LOT 2-R, IESI INDUSTRIAL PARK BEING A REPLAT OF LOT 2, IESI INDUSTRIAL PARK AN ADDITION IN THE CITY OF SANGER ACCORDING TO THE PLAT RECORDED UNDER CABINET U, SLIDE 75, P.R.D.C.T. 1 LOT | 2.993 ACRES OUT OF THE R. BEBEE SURVEY, ABSTRACT #29 CITY OF SANGER, DENTON COUNTY, TEXAS PREPARED DECEMBER, 2022 VICINITY MAP - NOT TO SCALE SITE PRELIMINARY THIS DOCUMENT SHALL NOT BE RECORDED FOR ANY PURPOSE AND SHALL NOT BE USED, VIEWED, OR RELIED UPON AS A FINAL SURVEY DOCUMENT December 15, 2022 POINT OF BEGINNING LEGEND OF ABBREVIATIONS ·D.R.D.C.T. DEED RECORDS, DENTON COUNTY, TEXAS ·P.R.D.C.T.PLAT RECORDS, DENTON COUNTY, TEXAS ·O.P.R.D.C.T.OFFICIAL PUBLIC RECORDS, DENTON COUNTY, TEXAS ·DOC.#DOCUMENT NUMBER ·C.M.CONTROLLING MONUMENT ·SQ. FT.SQUARE FEET ·ROW RIGHT OF WAY ·CRS CAPPED REBAR SET SHEET: Z:\Project Data\Survey\001 - Kirkman Engineering\2020\167 - Sanger Property\Drawings SURVEYOR'S NOTES: 1.Bearings are based on the State Plane Coordinate System, Texas North Central Zone (4202) North American Datum of 1983 (NAD '83), distances are surface with a combined scale factor of 1.00015063. 2.This property lies within Zone "X" of the Flood Insurance Rate Map for Denton County, Texas and Incorporated Areas, map no. 48121C0070G, with an effective date of April 18, 2011, via scaled map location and graphic plotting. 3.Monuments are found unless specifically designated as set. 4.Elevations (if shown) are North American Vertical Datum of 1988 (NAVD '88). SURVEYOR BARTON CHAPA SURVEYING 5200 State Highway 121 Colleyville, TX 76034 Phone: 817-864-1957 info@bcsdfw.com TBPLS Firm #10194474 5200 State Highway 121 Colleyville, TX 76034 Phone: 817-488-4960 DRAWN:BCS CHECKED:JHB TABLE OF REVISIONS DATE SUMMARY JOB NO.2020.001.167 SCALE: 1" = 30' 30'0 15'30'60' STATE OF TEXAS § COUNTY OF DENTON § WHEREAS PENTHOUSE SPEEDWAY CONDO, LLC is the owner of that tract of land out of the R. Bebee Survey, Abstract Number 29, in the City of Sanger, Denton County, Texas, and being all of Lot 2 of IESI Industrial Park, an addition in the City of Sanger, Denton County, Texas, according to the plat recorded under Cabinet U, Slide 75, Plat Records, Denton County, Texas, (P.R.D.C.T.), said Lot 2 being conveyed by deed to Penthouse Speedway Condo, LLC as recorded under Document Number 2020-190468, Official Public Records, Denton County, Texas, (O.P.R.D.C.T.), the subject tract being more particularly described by metes and bounds as follows (bearings are based on State Plane Coordinate System, Texas North Central Zone (4202) North American Datum of 1983 (NAD '83)): BEGINNING at a 1/2 inch rebar with cap stamped, “EAGLE SURVEYING” found for the northwest corner of said Lot 2 and the herein described tract; THENCE with the perimeter and to the corners of said Lot 2, the following calls: 1.South 88 degrees 38 minutes 21 seconds East, a distance of 437.83 feet to a 1/2 inch rebar with cap stamped, “EAGLE SURVEYING” found; 2.South 03 degrees 22 minutes 27 seconds East, a distance of 290.68 feet to a 1/2 inch rebar with cap stamped, “HAT-2901” found; 3.North 88 degrees 42 minutes 08 seconds West, a distance of 461.51 feet to a 1/2 inch rebar found; 4.North 01 degrees 17 minutes 52 seconds East, a distance of 290.20 feet, returning to the POINT OF BEGINNING and enclosing 2.993 acres (130,328 square feet) of land, more or less. STATE OF TEXAS § COUNTY OF ______________§ NOW, THEREFORE, KNOW ALL MEN BY THESE PRESENTS THAT, PENTHOUSE SPEEDWAY CONDO, LLC, acting herein by and through its duly authorized officer, does hereby adopt this plat designating the hereinabove described property as (lot/block/subdivision), an addition to the City of Sanger, Texas, and does hereby dedicate to the public use forever by fee simple title, free and clear of all liens and encumbrances, all streets, thoroughfares, alleys, fire lanes, drive aisles, parks, and watercourses, and to the public use forever easements for sidewalks, storm drainage facilities, utilities and any other property necessary to serve the plat and to implement the requirements of the subdivision regulations and other City codes and do hereby bind ourselves, our heirs, successors and assigns to warrant and to forever defend the title on the land so dedicated. Further, the undersigned covenants and agrees that he/she shall maintain all easements and facilities in a state of good repair and functional condition at all times in accordance with City codes and regulations. No buildings, fences, trees, shrubs, or other improvements or growths shall be constructed or placed upon, over, or across the easements as shown, except that landscape improvements may be installed, if approved by the City of Sanger. The City of Sanger and public utility entities shall have the right to access and maintain all respective easements without the necessity at any time of procuring permission from anyone. WITNESS my hand this the ______ day of ____________________ 20___ ___________________________________ PENTHOUSE SPEEDWAY CONDO, LLC, Owner (Authorized Agent) STATE OF TEXAS § COUNTY OF _______________§ BEFORE ME, the undersigned, a Notary Public in and for the State of Texas, on this day personally appeared_________________, known to me to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that he executed the same as for the purpose and consideration therein expressed, and in the capacity therein stated. _____________________ Notary Public in and for the State of Texas SURVEYOR'S CERTIFICATE STATE OF TEXAS § COUNTY OF TARRANT § I, John H. Barton III, a Registered Professional Land Surveyor of the State of Texas, do hereby certify that the map shown hereon accurately represents the described property as determined by a survey made on the ground under my direction and supervision. Date of Plat/Map: December 15, 2022 _______________________________________________________ John H. Barton III, RPLS# 6737 Date STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned, a Notary Public in and for the State of Texas, on this day personally appeared _______________________, known to me to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that he/she executed the same as for the purpose and consideration therein expressed, and in the capacity therein stated. _____________________ Notary Public in and for the State of Texas OWNER PENTHOUSE SPEEDWAY CONDO, LLC 1920 E. S.H. 114 SOUTHLAKE, TX 76092 ENGINEERPLAT NOTES: 1.All lots comply with the minimum size requirements of the zoning district. 2.This property may be subject to charges related to impact fees and the applicant should contact the City regarding any applicable fees due. 3.All common areas, drainage easements, and detention facilities will be owned and maintained by the HOA/POA. Any common area within the City’s right-of-way will require a facilities agreement, to be reviewed and approved by the City. 4.Notice – selling a portion of this addition by metes and bounds is a violation of City ordinance and State Law and is subject to fines and withholding of utilities and building permits. 5.This plat does not alter or remove existing deed restrictions, if any, on this property. 6.Minimum finished floor elevations are at least 2 feet above the 100 year flood plain. 7.The purpose of this replat is to dedicate easements within existing Lot 2. City will need to verify easement provided matches what is needed in the plans. Previous plans showed grading outside the property. 1. Show/label detention pond easements 2. Show private drainage easement for all channels . 3. Show any additional DE for roadside ditches 4. Show Min FFE Show and label offsite DE by separate instrument for proposed swale. Determine the 100-yr fully developed floodplain for ditch along the RR and verify if it reaches site (ie overflow across access road, etc) If it reaches site, provide a floodplain easement (floodplain +10' buffer) Verify size, it does not appear to contain flow. DE must extend beyond top of bank Show appropriate setbacks. 57 Item 6. 940.458.2059 | 201 Bolivar St. |PO Box 1729 | Sanger, TX 76226 | www.sangertexas.org facebook.com/SangerTexas @CityofSanger DATE: 01/30/2023 1st REVIEW COMMENTS – Replat Plat (IESI Industrial Park) The request is for a Replat of the IESI Industrial Park Lot 2, being approximately 2.993 acres, prepared by Kirkman Engineering, submitted on 01/18/2023. Below are the comments that should be addressed before City Council approval. Resubmit the revised plat along with a response letter addressing all comments. Planning Provide the following 1. Provide a signed and notarized copy of private restrictions (if any), that is filed for record in the office of the County Clerk. 2. Name and addresses of the owner, subdivider, engineer, and surveyor. 3. Change the plat name to Replat. 4. List the complete date of preparation and subsequent revisions. 5. Add note “The subject property does not lie within a 100-year floodplain according to Community Panel No.___ dated ____, of the National Flood Insurance Rate Maps for Denton County, Texas.” 6. Add note “Bearings are based on the State Plane Coordinate System, Texas North Central Zone (4202), North American Datum of 1983 (NAD ’83)” 7. List the name, address, and phone number of utility providers. 8. Include the city signature lines from checklist. Informational Comments 1. The property is within the City of Sanger. 2. The Final Plat will be scheduled for Planning and Zoning (P&Z) Commission meeting on Monday, February 13, 2023, and for the City Council meeting on Monday, March 6, 2023. 58 Item 6. CITY COUNCIL COMMUNICATION DATE: March 6, 2023 FROM: Ramie Hammonds, Development Service Director AGENDA ITEM: Consideration and possible action on Ordinance No 03-04-23 amending Chapter 13 Utilities, by adding Article 13.2800 Municipal Setting Designation, Sections 13.2801 Definitions, 13.2802 Use of Groundwater in MSD Areas Prohibited, 13.2803 Application for City Council Approval of MSD, 13.2804 Staff Review, 13.2805 Notice of Public Meeting, 13.2806 Public Meeting, 13.2807 City Council Public Hearing, 13.2808 Limitation on Reapplication, and 13.2809 Additional Provisions, Enforcement, and Penalties SUMMARY:  The City of Sanger’s Code of Ordinance currently does not address Municipal Setting Designations (MSD’s).  This ordinance will establish a process and guidelines for requesting a MSD.  MSD’s are requested when a property has contamination that would typically require remediation.  Often the remediation is costly and makes developing the property difficult.  In certain cases these properties can apply for a MSD to allow the property to develop or be used without remediation.  This ordinance gives City Council the ability to approve, conditionally approve, disapprove, or postpone action on the application. FISCAL INFORMATION: Budgeted: N/A Amount: N/A GL Account: N/A RECOMMENDED MOTION OR ACTION: Staff recommends APPROVAL. ATTACHMENTS: Ordinance No 03-04-23 59 Item 7. Ordinance – 03-04-23 Amendment to Chapter 13 Municipal Settings Designation Page 1 of 2 CITY OF SANGER, TEXAS ORDINANCE 03-04-23 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SANGER, DENTON COUNTY, TEXAS, REGARDING AMENDING THE CITY OF SANGER CODE OF ORDINANCE, CHAPTER 13 UTILITIES, ARTICLE 13.2800 MUNICIPAL SETTING DESIGNATION, SECTIONS 13.2801 DEFINITIONS, 13.2802 USE OF GROUNDWATER IN MSD AREAS PROHIBITED, 13.2803 APPLICATION FOR CITY COUNCIL APPROVAL OF MSD, 13.2804 STAFF REVIEW, 13.2805 NOTICE OF PUBLIC MEETING, 13.2806 PUBLIC MEETING, 13.2807 CITY COUNCIL PUBLIC HEARING, 13.2808 LIMITATION ON REAPPLICATION, AND 13.2809 ADDITIONAL PROVISIONS, ENFORCEMENT, AND PENALTIES; PROVIDING FOR THE REPEAL OF ALL ORDINANCES IN CONFLICT; PROVIDING A CUMULATIVE CLAUSE; PROVIDING FOR A SEVERABILITY CLAUSE; PROVIDING FOR A PENALTY OF FINE IN ACCORDANCE WITH SECTION 1.109 OF THE CODE OF ORDINANCE FOR VIOLATIONS; AND PROVIDING A SAVINGS CLAUSE; AUTHORIZING PUBLICATION; AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, the City of Sanger (the “City”) is a home rule municipality regulated by state law and Charter; and WHEREAS, the City Council finds it necessary for the public health, safety, and welfare that development occur in a controlled and orderly manner; and WHEREAS, all request for amendment to the Code of Ordinance were duly filed with the City of Sanger, Texas; and WHEREAS, the following provision of proper legal notice requirements, were made in the time and manner prescribed by law; and WHEREAS, the City Council finds that the passage of this Ordinance is in the best interest of the citizens of Sanger. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF SANGER, TEXAS: SECTION 1. That an amendment to Chapter 13 Utilities, Article 13.2800 Municipal Setting Designation, Sections 13.2801 Definitions, 13.2802 Use of Groundwater in MSD Areas Prohibited, 13.2803 Application for City Council Approval of MSD, 13.2804 Staff Review, 13.2805 Notice of Public Meeting, 13.2806 Public Meeting, 13.2807 City Council Public Hearing, 13.2808 Limitation on Reapplication, and 13.2809 Additional Provisions, Enforcement, and Penalties as described in Exhibit A is hereby granted. 60 Item 7. Ordinance – 03-04-23 Amendment to Chapter 13 Municipal Settings Designation Page 2 of 2 SECTION 2. That all matters stated in the preamble are found to be true and correct and are incorporated herein as if copied in their entirety. SECTION 3. It is hereby declared to be the intention of the City Council that the sections, paragraphs, sentences, clauses, phrases and words of this Ordinance are severable and, if any word, phrase, clause, sentence, paragraph, or section of this Ordinance shall be declared unconstitutional by the valid judgment or decree of any court of competent jurisdiction, such unconstitutionality shall not affect any of the remaining portions of this Ordinance, since the same would have been enacted by the City Council without the incorporation in this Ordinance of any such unconstitutional word, phrase, clause, sentence, paragraph, or section. SECTION 4. Any person, firm or corporation who shall violate any of the provisions of this article shall be guilty of a misdemeanor and upon conviction shall be fined in accordance with the general penalty provision found in The Code of Ordinances, Section 1.109 General Penalty for Violations of Code. SECTION 5. This ordinance will take effect immediately from and after its passage and the publication of the caption, as the law and Charter in such cases provide. PASSED AND APPROVED by the City Council of the City of Sanger, Texas, on this 6th day of March, 2023. APPROVED: ________________________________ ATTEST: Thomas E. Muir, Mayor ________________________________ APPROVED TO FORM: Kelly Edwards, City Secretary ________________________________ Hugh Coleman, City Attorney 61 Item 7. EXHIBIT A ARTICLE 13.2800 MUNICIPAL SETTING DESIGNATION (MSD) Sec. 13.2801 Definitions For the purposes of this article, the following terms, phrases, words, abbreviations, and their derivations shall have the meaning given herein. When not inconsistent with the context, words used in the present tense include the future tense, words in the plural number include the singular number and words in the singular number include the plural number. The word "shall" is always mandatory and not merely directory. Words not defined shall be given their common and ordinary meaning. Affected community. Those persons entitled to notice as defined in section 13-2803(b)(6). Authorized representative. For purposes of signing an application, if the applicant is a corporation, the president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the corporation; if the applicant is a partnership or sole proprietorship, a general partner or proprietor, respectively; and if the applicant is a local government, the chief executive officer or his authorized designee. Chemical or contaminant of concern. Any chemical that has the potential to adversely affect ecological or human receptors due to its concentration, distribution, and mode of toxicity. City attorney. The City Attorney for the City of Sanger or the City Attorney's authorized representative. Designated groundwater. Groundwater that will be or is prohibited from use as potable water, or for all uses, by a municipal setting designation ordinance. Designated property. The property that will be or is subject to a municipal setting designation ordinance. The designated property may cover several platted lots or tracts of land. Director. The Director of Development Services for the City of Sanger, or the Director's authorized representative. Environmental risk assessment. The qualitative and quantitative evaluations performed to define the risk posed to human health and/or the environment by the presence or potential presence and/or use of pollutants. Groundwater. Water below the surface of the earth. Ingestion protective concentration level. The protective concentration level for human ingestions of contaminants of concern established by the TCEQ under the Texas Risk Reduction Program, determined as if there was no municipal setting designation. Ingestion protective concentration level zone. The area where concentrations of contaminants of concern from sources on or migrating through the designated property are greater than the 62 Item 7. ingestion protection concentration level, determined as if there was no municipal setting designation. Municipal setting designation (MSD). A designation as provided by V.T.C.A. Health and Safety Code Ch. 361, Subch. W, which authorizes the Executive Director of the Texas Commission on Environmental Quality to certify municipal setting designations to limit the scope of, or eliminate the need for, investigations or response actions addressing contaminant impacts to groundwater that has been restricted from use by ordinance or restrictive covenant. Municipal setting designation ordinance. An ordinance adopted pursuant to this article. Noningestion protective concentration level. The protective concentration level for dermal contact or inhalation of contaminants of concern established by the TCEQ under the Texas Risk Reduction Program. Noningestion protective concentration level exceedance zone. The area where concentrations of contaminants of concern from sources on or migrating from or through the designated property are greater than noningestion protection concentration levels for contaminants of concern established by the TCEQ under the Texas Risk Reduction Program. Potable water. Water used for irrigating crops intended for human consumption, as well as water used for drinking, showering, bathing, or cooking purposes. Protective concentration level. The lowest concentration level for a contaminant of concern within a source medium is determined from all applicable exposure pathways and as defined in the Texas Risk Reduction Program. Response action. The control, decontamination, or removal from the environment of a contaminant or hazardous substance pursuant to V.T.C.A. Health and Safety Code Ch. 361, Subch. W, "Municipal Setting Designation," of "Solid Waste Disposal Act". TCEQ. The Texas Commission on Environmental Quality. TCEQ application. The application submitted to the TCEQ for certification of a municipal setting designation. To the extent known. Information known by an applicant or applicant's agent after review of all public and private records and other information sources available in the exercise of due diligence. Sec. 13.2802 Use of Groundwater in MSD Areas Prohibited (a) A person commits an offense if the person intentionally, knowingly, or with criminal negligence uses groundwater in the designated property as a potable or non-potable water source. (b) A person commits an offense if the person intentionally, knowingly, or with criminal negligence uses groundwater in designated property for any purpose prohibited as a condition of council approval, as specified in section 13.2807(d). 63 Item 7. Sec. 13.2803 Application for City Council Approval of MSD (a) A person seeking city council approval of an MSD for an area within the corporate limits of the City of Sanger shall apply in writing to the Development Services Department of the City of Sanger, with the number and format of copies, as determined by the director. (b) An application shall contain: (1) The applicant's name and address, and the name, address, daytime telephone number, and email address of both the applicant's contact person and the licensed professional who prepared the application; (2) The location and legal description of the proposed outer boundaries of the MSD area for which designation is sought; (3) A statement as to whether a public drinking water supply system exists that satisfies the requirements of V.T.C.A. Health and Safety Code Ch. 341 and that supplies or is capable of supplying drinking water to the area for which the MSD is sought, and property within one-half mile of the area for which the MSD is sought; (4) A description of the groundwater sought to be restricted, including the identified chemicals of concern therein and the levels of contamination known to the applicant, and the identified vertical and horizontal extent of the contamination. If the applicant has not documented groundwater contamination offsite that originates from the area for which an MSD is sought, the application shall include a statement as to whether contamination more likely than not exceeds residential assessment levels offsite and the basis for that statement; (5) Identification of the points of origin of the contamination, and identification of the person(s) responsible for the contamination, to the extent known; (6) A listing of: a. All state-registered private water wells within five (5) miles from the boundary of the area for which the designation is sought, including a notation of those wells that are used for potable water purposes (if known); b. Each retail public utility, as that term is defined in the Texas Water Code, that owns or operates a groundwater supply well located not more than five (5) miles from the area for which the MSD is sought; c. Each municipality, other than the City of Sanger, with a boundary located not more than one-half (½) mile from the area for which the MSD is sought; or that owns or operates a groundwater supply well located not more than five (5) miles from the area for which the MSD is sought; and d. All owners of real property lying within two hundred (200) feet of the subject property, as the ownership appears on the last approved city tax roll. (7) A site map, drawn to scale, including a metes and bounds description of the proposed designated property, the boundary of the proposed MSD area, the location of groundwater on the proposed MSD area, and the extent of groundwater contamination to the limits that it has been defined. The map shall include a statement by a professional 64 Item 7. land surveyor registered by the Texas Board of Professional Surveying attesting to the accuracy of the metes and bounds description; (8) The location of all soil sampling points and groundwater monitoring wells; (9) For each contaminant of concern found at the site, to the extent known, provide a table displaying the following information: a. The level of contamination, the ingestion protective concentration level, and noningestion protective concentration levels, all expressed as mg/L or mg/kg, depending on the sampling medium; and b. The critical protective concentration level as defined without the municipal setting designation, highlighting any exceedances; and c. The critical protective concentration level as defined with the municipal setting designation, highlighting any exceedances; and d. A digital file, in a format acceptable to the Director, that summarizes this information. (10) A statement as to whether contamination on and off the designated property will exceed a residential assessment level as defined in the Texas Risk Reduction Program if known, and the basis for that statement; (11) A description of any environmental regulatory actions that have been taken within the last five (5) years in conjunction with the designated property, to the extent known; (12) A listing of all existing TCEQ, U.S. Environmental Protection Agency registrations, permits, and identification numbers that apply to the designated property; (13) A summary of any environmental site assessment reports filed with the TCEQ regarding any site investigation or response actions that are planned, ongoing, or completed related to this designated property; (14) A statement as to whether the designated property has been submitted to the Texas Voluntary Cleanup Program (V.T.C.A. Health and Safety Code § 361.601) or similar state or federal program, and a description of the designated property's status in the program; (15) Any other information that the director deems pertinent. (c) The application shall be signed by an authorized representative of the applicant and shall contain the following certification statement: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in a manner designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." (d) An application shall be accompanied by: 65 Item 7. (1) An electronic file of the names and addresses of persons listed in subsection (b)(6) above, in a format acceptable to the director and compatible with city information systems; and (2) A set of printed mailing labels with the names and addresses of persons listed in subsection (b)(6) above; and (3) A nonrefundable application fee in an amount set by the city council; and (4) It is the sole responsibility of the applicant to ensure that the language of the public notice, as well as the notification process itself, meets the state requirements. (e) An applicant may withdraw their application only in writing by letter sent by certified mail, return receipt requested, to the Director, and shall forfeit the application fee. If the Director has not issued public notice prior to the receipt of the withdrawal letter, the applicant may reapply at any time. If public notice has been issued, a new application is subject to the limitations of section 13-2808 below. Sec. 13.2804 Staff Review (a) For purposes of the times stated in this article, an application is deemed to have been received on the date that the application was actually received by the Director, as indicated by the filing date on the application by the Development Services department. (b) The application for an MSD shall be forwarded to the development review committee (DRC) for staff review. The purpose of the review is to determine whether the application is complete and whether any current or future city property or other interests have the potential to be impacted by the proposed MSD. City staff shall not conduct an environmental risk assessment of the application. (c) If the Director, in his or her sole discretion, determines that it is likely that a source of a contaminant of concern originated on the designated property, and that the ingestion or noningestion protective concentration level exceedance zone for that contaminant of concern extends to the public right-of-way adjacent to the designated property, the Director may recommend that the municipal setting designation include a condition that the public right- of-way adjacent to the property be included, at no additional cost to the city, in the TCEQ application for the MSD. (d) If the Director determines that the application is incomplete or insufficient, the application will be returned to the applicant, noting the deficiencies in writing. The applicant shall have thirty (30) days from the date of the deficiency letter to correct the deficiencies and resubmit the application. If the applicant fails to submit a corrected application within the allotted time, the application shall be deemed to be withdrawn and the application fee forfeited. (e) If the Director determines that the application is complete, a public meeting and a public hearing will be scheduled. The public meeting must be held prior to the public hearing. (1) A public meeting will be scheduled approximately forty-five (45) days following the day the application was received; and (2) A public hearing of the city council will be scheduled approximately thirty (30) days following the public meeting. 66 Item 7. Sec. 13.2805 Notice of Public Meeting (a) Notice of the public meeting for an MSD application must include the date, time, and location of the public meeting, the identity of the applicant, the location and legal description of the designated property, the purpose of the MSD, the type of contamination identified in the groundwater of the area for which the MSD is sought, and a statement that a copy of the application is available for public viewing at the city secretary's office notice will be made as follows: (1) The Director will publish notice of a public meeting for a proposed MSD in the official newspaper of the city, or in a newspaper of general circulation, not less than fifteen (15) days before the public meeting; (2) The Director will provide written notice of a public meeting for a proposed MSD, not less than fifteen (15) days before the date of the public meeting by properly addressed and regular postage paid, in the United States mail. Notice will be mailed to: a. The applicant; b. Those on the list provided by the applicant pursuant to section 13-2803(b)(6); (b) The applicant is required to post at least one (1) sign-up on the area for which an MSD has been requested. The sign(s) must state that an MSD has been requested for the area and that additional information can be acquired by telephoning the number listed thereon or visiting the website address listed thereon. The erection and/or the continued maintenance of any such sign shall not be deemed a condition precedent to the holding of any public meeting or public hearing or any official action concerning the MSD application. Sec. 13.2806 Public Meeting (a) The purpose of a public meeting is for the applicant to present information to the affected community about the MSD process in general, the application specific to the property for which the MSD is being sought, and to obtain input from the affected community prior to formal action by the city council. (b) The applicant or its representative must appear at the public meeting. If the applicant fails to appear at the public meeting either in person or by a representative, the application shall be deemed withdrawn and the application fee forfeited. (c) The Director will facilitate the meeting, allowing the applicant or its representative the opportunity to present its reasons for requesting an MSD, and allowing members of the affected community the opportunity to ask the applicant questions or make oral comments on the application. Sec. 13.2807 City Council Public Hearing (a) Prior to the public hearing, the Director will provide the city council a copy of the application, and a written report summarizing the request for the MSD approval, any staff comments or concerns, and minutes of the public meeting. 67 Item 7. (b) The applicant or its representative must appear at the public hearing and present the request for MSD approval. If the applicant fails to appear at the public hearing, the application shall be deemed withdrawn and the application fee forfeited. (c) Persons wishing to speak either in favor of or against the application will be provided the opportunity by city council guidelines for public hearings. (d) Following the conclusion of the public hearing, the city council may approve, conditionally approve, disapprove, or postpone action on the application to a future date. If approving an application, the city council shall: (1) Approve a municipal setting designation ordinance supporting the application to be presented to the TCEQ, and prohibiting the use of designated groundwater from beneath the designated property; and (2) Include in the ordinance other reasonable restrictions, including, but not limited to specification of underground construction materials to be used in the designated property. (e) City council approval of an application shall not be deemed to waive the city's right to comment on an MSD application that has been filed with the executive director of the TCEQ. Sec. 13.2808 Limitation on Reapplication If after a public hearing the city council disapproves an application, or if the applicant has withdrawn its application after public notice has been issued, no new MSD applications for the proposed designated property shall be accepted by the city or scheduled for a public hearing by the city council within a period of twelve (12) months of the date of disapproval or withdrawal. Sec. 13.2809 Additional Provisions, Enforcement, and Penalties (a) A person who has received approval of an MSD from the city, shall, upon issuance from the TCEQ, provide the Director with a copy of the certificate of completion or other documentation issued for the MSD area, showing that response actions, if required, have been completed. (b) The applicant shall execute, deliver and file, no later than thirty (30) days from the date of the TCEQ's certification, in the official real property records of Denton County, Texas, a deed restriction approved as to form by the City Attorney prohibiting the drilling of wells and the use of designated groundwater for any purpose, including but not limited to any potable purpose, and excepting only: (i) wells used as monitoring wells for the collection of groundwater samples for chemical or biological laboratory analyses; and (ii) wells used for remediation of soil or groundwater contamination. (c) A file-stamped and recorded copy of said deed restriction shall be delivered to the city attorney's office and the Director's office within three (3) business days after the date of filing. The deed restriction shall be enforceable by the City of Sanger and may be amended or terminated only with the prior written consent of the City of Sanger after at least thirty (30) days prior written notice to the TCEQ of any pending amendment or termination. 68 Item 7. (d) A person commits an offense if they fail to provide the City Attorney and the Director with the documentation required in this section within the specified time frames. (e) A person commits an offense if the person intentionally, knowingly, or with criminal negligence uses groundwater in a designated property for a purpose prohibited in the municipal setting designation ordinance. (f) Any person who violates any provision of this article shall, upon conviction, be punished by a fine not to exceed two thousand dollars ($2,000.00). Each day that one or more provisions in this article are violated shall be considered a separate offense. (g) The City Attorney is authorized to commence an action for appropriate legal or equitable relief in a court of competent jurisdiction in addition to the penalty mentioned in the above subsection (f). Such additional relief may include a civil fine of up to one thousand dollars ($1,000.00) per day for violations of sections 13-2808, and all other damages, costs, remedies, and legal processes to which the city may be entitled. (h) This article shall be and is hereby declared to be cumulative of all other ordinances of the City of Sanger, and this article shall not operate to repeal or affect any of such other ordinances except insofar as the provisions thereof might be inconsistent or in conflict with the provisions of this article, in which event such conflicting provisions, if any, in such other ordinance or ordinances are hereby repealed. (i) All of the regulations provided in this article are hereby declared to be governmental and for the health, safety, and welfare of the general public. Any member of the city council or any city official or employee charged with the enforcement of this article, acting for the City of Sanger in the discharge of his/her duties, shall not thereby render himself/herself personally liable; and he/she is hereby relieved from all personal liability for any damage that might accrue to persons or property as a result of any act required or permitted in the discharge of his/her said duties. 69 Item 7. CITY COUNCIL COMMUNICATION DATE: March 6, 2023 FROM: Ramie Hammonds, Development Services Director AGENDA ITEM: Consideration and possible action on the Final Plat of the Mo Addition, being 38.16 acres, located in the City of Sanger’s ETJ, and generally located on the south side of FM 455 approximately 1961 feet west of the intersection of FM 455 and Creekview Road. SUMMARY:  The applicant is proposing to create 1 lot from 7 unplatted tracts.  This site is located on the south side of FM 455 approximately 1961 feet west of Creekview Road.  The lot would have access from FM 455.  The lot will be serviced by Bolivar Water Supply Corporation and have on-site sanitary sewer facilities.  The property is located in the City of Sanger’s ETJ.  This plat meets the subdivision ordinance.  The Planning and Zoning Commission recommend APPROVAL on 2-13-23. FISCAL INFORMATION: Budgeted: N/A Amount: N/A GL Account: N/A RECOMMENDED MOTION OR ACTION: Staff recommends APPROVAL. ATTACHMENTS: Location Map Final Plat Application Letter of Intent 70 Item 8. 12 84 35 59 76 2 59 76 1 12 84 19 30 00 31 12 84 17 13 22 485977957678 59 77 2 68 30 81683083 73 98 38 10 60 59 74 119 7 30 00 29 74 41 78 10 60 56 57 37 5 73 15 42 30 00 30 74 41 82 74 52 11 57 20 8 73 16 45 68 30 82 57 20 0 30 00 28 74 12 27 76 63 38 76 63 39 57 37 2 74 52 10 12 84 54 65 07 54 13 22 53 65 07 53 59 74 7 59 74 7 33 91 38 65 07 43 13 22 52 77 38 91 59 74 2 59 75 2 12 84 57 77 38 90 12 84 51HACHTEL DR CREEKVIEW RD F M 4 5 5 W /Project Name: MO AdditionMinor PlatProject: 23SANZO N-0004 0 400 800200 Fe et DISCLA IMER:This map wa s g en e ra te d by GI S da ta p ro vid edby the S a ng er GIS De pa rtme nt . Th e City o f Sanger do es n ot gu a ra n te e the c orrec tne ss oraccuracy o f a n y fe a tu re s o n th is ma p. Th ese ma pproducts are fo r illust ra tio n pu rpo se s o n ly an dare not suit ab le fo r site -s pe cific d e cision ma king .GIS dat a is su bje ct to co nst an t cha n ge s, an dmay not b e co mple te , a ccu rat e o r cu rren t.Date: 1/22 /2 02 3 4 :11 :10 P MDoc Name : 2 3 SA NZON-0 00 4 _MO A d ditio n Mino r Pla tCity L imi ts Exhi bi ts SubjectArea 71 Item 8. SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL SL FARM - T O - M A R K E T R O A D 455 RIGH T - O F - W A Y V A R I E S P. BLACK S U R V E Y , ABSTRACT N O . 1 0 3 E. HALL SU R V E Y , ABSTRACT N O . 1 5 2 3 APPROXIMATE LOCATION OF SURVEY ABSTRACT LINE (TYPICAL) CALLED TRACT 1 - 6.49 ACRES JOHN HARVEY REED, JR., TRUSTEE OF THE JOHN HARVEY REED JR. EXEMPT TRUST DOC. NO. 2016-50155 O.R.D.C.T. CALLED TRACT 2 - 23.52 ACRES JOHN HARVEY REED, JR., TRUSTEE OF THE JOHN HARVEY REED JR. EXEMPT TRUST DOC. NO. 2016-50155 O.R.D.C.T. LOT 1R-1 LOTS 1R-2 AND 1R-2, GRISSOM ESTATES DOC. NO. 2020-25 P.R.D.C.T. LOT 1R-2 LOTS 1R-2 AND 1R-2, GRISSOM ESTATES DOC. NO. 2020-25 P.R.D.C.T. TRACT 2 CHOCTAW RIDGE CAB. F, PG. 6 P.R.D.C.T. TRACT 3 CHOCTAW RIDGE CAB. F, PG. 6 P.R.D.C.T. CALLED 9.922 ACRES ALLEN ADAM SERRANO AND KAREN SUE SERRANO DOC. NO. 1995-19882 O.R.D.C.T. ZONE "AE" ZONE "AE" FLOODWAY ZONE "AE" FLOODWAY ZONE "AE" FLOODWAY ZONE "AE" ZONE "AE" ZONE "AE" ZONE "X" SHADED ZONE "X" SHADED ZONE "X" SHADED ZONE "X" SHADED ZONE "X" SHADED ZONE "X" UNSHADED ZONE "X" UNSHADED ZONE "X" UNSHADED ZONE "X" UNSHADED ZONE "AE" OHU OH U OH U OH U OH U OH U OH U OH U OH U OH U OH U OHU OHU OHU TBM PK NAIL N:7181996.6 E:2362979.0 ELEV:653.2' TBM CIRS "EAGLE CONTROL" N:7181046.7 E:2362990.0 ELEV:676.3' FL-12"CPP=662.1' FL-12"CPP=662.3' FL-24"CMP=649.2' 655 65 3 653 65 4 65 4 655 656 657 658 6 5 8 657 65 665 7 6 5 4 65 5 64564664 764 8 64 9 65 0 6 5 1 6 5 2 6 5 3 643 64 4 63 9 64 0 64 1 64 2 63 7 63 8 63 7 635636637634 636 63 6 637 63 6 63 5 6 3 4 63 3 63 4 63 7 6 3 7 6 3 6 63 2 63 3 63 4 63 5 6 3 7 6 3 8 6 3 9 6 4 0 64 1 642 6 4 3 6 4 4 6 4 5 6 4 6 6 4 7 64 8 64 9 65 0 65 165 2 6 5 3 6 5 4 65 5 6 5 6 65 7 6 5 8 65 9 6 6 0 6 6 1 6 6 2 6 6 3 6 6 4 6 6 5 6 6 6 6 6 7 6 6 8 657658659660 662 661 660 659 658 6 5 7 6 5 8 6 5 9 6 5 9 6 5 8 6 5 7 6 5 6 6 5 5 6 5 4 6 5 3 6 5 2 651 6 4 1 6 4 2 6 4 3 6 4 4 6 4 5 6 4 6 6 4 7 6 4 8 6 4 9 6 5 0 6 5 1 6 3 9 6 4 0 63 7 638 63 9 64 0 64 1 64 2 6 4 3 6 4 4 6 4 5 6 4 6 6 4 7 6 4 8 6 4 9 65 0 65 1 65 2 6 5 3 65 4 65 5 65 6 65 76 5 8 6 5 9 6 6 0 6 6 1 6 6 2 6 6 3 6 6 4 6 6 5 6 6 6 6 6 7 6 8 1 68 0 679 67 8 6 7 7 6 7 6 6 7 5 6 7 4 6 7 3 6 7 2 6 7 1 6 7 0 6 6 9 6 6 8 APPROXIMATE FLOOD ZONE LOCATION AS SCALED PER FEMA MAP (TYPICAL) CALLED 37.93 ACRES SELVIN DAVID LOPEZ MERIDA AND VERONICA REMEDIOS OLVERA DOC. NO. 2018-11604 O.R.D.C.T. FENCE POST FOUND S 89°04'44" E 1292.38' S 68°4 0 ' 3 6 " W 1 8 4 . 9 2 ' 11 2 . 6 6 ' S 5 9 ° 3 9 ' 4 8 " E 1 4 5 . 5 8 ' S 2 2 ° 5 4 ' 5 0 " E S 0 9 ° 1 7 ' 0 4 " E 1 9 2 . 8 9 ' N 88°52'09" W 1165.16' S 0 3 ° 0 0 ' 3 7 " E 4 0 1 . 3 3 ' S 3 3 ° 4 2 ' 3 4 " W 2 8 2 . 2 9 ' N 0 0 ° 3 6 ' 2 7 " E 1 5 3 3 . 9 2 ' L1 L2 L3 S 0 0 ° 2 2 ' 0 8 " W 2 9 6 . 4 2 ' C1 POB CALLED 0.066 ACRES SELVIN DAVID LOPEZ MERIDA AND VERONICA REMEDIOS OLVERA DOC. NO. 2018-43754 O.R.D.C.T. CALLED 0.13 ACRES SELVIN DAVID LOPEZ MERIDA AND VERONICA REMEDIOS OLVERA DOC. NO. 2022-4118 O.R.D.C.T. 1/2"IRF N: 7180388.19 E: 2364082.76 48.35' S 89°14'06" E CIRS POINT IN CREEK POINT IN CREEK POINT IN CREEK POINT IN CREEK POINT IN CREEK POINT IN CREEK POINT IN CREEK POINT IN CREEK POINT IN CREEK CIRS CIRS 30' BUILDING LINE SETBACK BY THIS PLAT 16' UTILITY EASEMENT BY THIS PLAT LOT 1 38.16 ACRES - GROSS 1,662,343 SQ.FT. - GROSS 23.67 ACRES - NET 1,031,292 SQ. FT. - NET LESS ZONE "AE" AND ZONE "AE" FLOODWAY CL CL CL CL C L C L GRATE INLET TOP= 653.6' 4 0 . 0 ' 1/2"IRF "KAZ" N: 7181945.02 E: 2362934.09 NAD'83 4 0 . 0 ' CALLED 15.789 ACRES ROVERT HUGHEY AND AMBER DEANE HUGHEY DOC. NO. 2018-89070 O.R.D.C.T. 54.18 ' LOT 2 GRISSOM ESTATES DOC. NO. 2010-84 P.R.D.C.T. DRAINAGE EASEMENT BY THIS PLAT DRAINAGE EASEMENT BY THIS PLAT 8.3'x10.3' STONE/STUCCO WELLHOUSE 8.3'x10.3' STONE/STUCCO WELLHOUSE N = PLAT BOUNDARY PAGE 1 OF 2FINAL PLAT MO ADDITION LOT 1, BLOCK A 1 LOT / 38.16 ACRES BEING ALL OF A CALLED 37.93 ACRE TRACT, 0.13 ACRE TRACT & 0.066 ACRE TRACT RECORDED IN DOC. NO. 2018-11604, 2022-4118 & 2018-43754, OFFICIAL RECORDS, DENTON COUNTY, TEXAS, IN THE P. BLACK SURVEY, ABSTRACT No. 103, E. HALL SURVEY, ABSTRACT No. 1523 IN THE ETJ OF THE CITY OF SANGER, DENTON COUNTY, TEXAS DATE OF PREPARATION: 1/17/2023 Drafter Project Date EN 02/23/2023 2005.033-03 EAGLE SURVEYING, LLC 222 S. Elm Street, Suite: 200 Denton, TX 76201 (940) 222-3009 TX Firm #10194177 SURVEYOR Eagle Surveying, LLC Contact: Brad Eubanks 222 S. Elm Street, Suite: 200 Denton, TX 76201 (940) 222-3009 = CAPPED IRON ROD SETCIRS = CAPPED IRON ROD FOUNDCIRF PLAT RECORDS,P.R.D.C.T. = CABINETCAB = PAGEPG DENTON COUNTY, TEXAS= OFFICIAL RECORDS,O.R.D.C.T.DENTON COUNTY, TEXAS= LEGEND = POINT OF BEGINNINGPOB = IRON ROD FOUNDIRF OWNER Selvin David Lopez Merida & Veronica Remedios Olvera 2512 Craig Lane Denton, TX 76209 (940) 458-1993 DOCUMENT NUMBERDOC. NO. = VICINITY MAP (NOT TO SCALE) = ADJOINER BOUNDARY SITE LOCATION 35 KE A T O N 455 5TH DUCK CREEK WILLOW 5 T H ELM DUCK CREEK DUCK CREEK SU L L I V A N CHAPMAN RD CR E E K V I E W ENGINEER Development Engineering Consultants, LLC Contact: Shawn Rockenbaugh 5300 Town & Country Boulevard, Suite 150 Frisco, TX 75034 (469) 850-0060 1" = 100' 0 10050 SL = SURVEY LINE LINE TABLE LINE BEARING DISTANCE L1 S 10°00'36" W 67.91' L2 S 26°11'02" W 85.53' L3 S 65°16'50" W 74.78' CURVE TABLE CURVE ARC LENGTH RADIUS DELTA ANGLE CHORD BEARING CHORD LENGTH C1 54.19'2914.79'1°03'54"N 68°12'54" E 54.18'1.The purpose of this plat is to create one (1) lot of record from three unplatted tracts of land. 2.This property is located in Zone "AE", Zone "AE" Floodway, Zone "X" Shaded, & Zone "X" Unshaded, as scaled from the F.E.M.A. Flood Insurance rate Map dated April 18, 2011 and is located in Community Number 480074 as shown on Map Number 48121C0205G. The location of the Flood Zone is approximate. For additional information regarding Flood Zone designation, please contact 1-(877) FEMA MAP. 3.The grid coordinates shown on this plat are based on GPS observations utilizing the AllTerra RTKNET Cooperative network. NAD 83(2011) State Plane Coordinate System (Texas North Central Zone - 4202). 4.Notice: Selling a portion of this addition by metes and bounds is a violation of City Ordinance and State Law, and is subject to fines and withholding of utilities and building permits. 5.All interior property corners are marked with a 1/2-inch iron rod with a green plastic cap stamped "EAGLE SURVEYING" unless noted otherwise. 6.The bearings shown on this plat are based on GPS observations utilizing the AllTerra RTKNET Cooperative network. NAD 83(2011) Datum. 7.All lots comply with the minimum size requirements of the zoning district. 8.This property may be subject to charges related to impact fees and the applicant should contact the City regarding any applicable fees due. 9.All common areas, drainage easements, and detention facilities will be owned and maintained by teh HOA/POA. Any common area with in the City's right-of-way will require a facilities agreement, to be reviewed and approved by the City. 10.This plat does not alter or remove existing deed restrictions, if any, on this property. 11.Minimum finished floor elevations are at least 2 feet above the 100 year floodplain. 12.Sanitary sewer to be handled by facilities approved by the Denton County Public Health Department. 13.All surface drainage easements shall be kept clear of fences, buildings, foundations, plantings, and other obstructions to the operation and maintenance of the drainage easement. 14.The maintenance of paving, grading and drainage improvements and/or easements shown on this plat are the responsibility of the individual property owners and do not constitute acceptance of same for maintenance purposes by Denton County. 15.Construction not complete within two years of the Commissioners Court approval shall be subject to current County Subdivision Rules and Regulations. 16.A driveway culvert must be obtained from Development Services by the owner of each lot prior to the construction, installation or placements of any driveway access improvements within the dedicated right-of-way. 17.No construction, without written approval from Denton County shall be allowed within an identified "FIRM" floodplain area, and then only after a detailed floodplain development permit including engineering plans and studies show that no rise in Base Flood Elevation (BFE) will result, that no flooding will result, that no obstruction to the natural flow of water will result; and subject to all owners of the property affected by such construction becoming a part to the request. Where construction is permitted, all finished flood elevations shall be a minimum of two-foot above the 100-year flood elevation. 18.Blocking the flow of water or construction improvements in surface drainage easements, and filling or obstruction the floodway is prohibited. 19.Denton County will not be responsible for any damage, personal injury or loss of life or property occasioned by flooding or flooding conditions. 20.The existing creeks or drainage channels traversing along or across the addition will remain as open channels and will be maintained by the individual property owners of the lot or lots that are traversed by or adjacent to the drainage courses along or across the lots. 21.Denton County shall not be responsible for maintenance of private streets, drives, emergency access easements, recreation areas and open spaces; and the owners shall be responsible for the maintenance of private streets, drives, emergency access easements, recreation areas and open spaces, and said owners agree to indemnify and hold harmless Denton County, from all claims, damages and losses arising our of the resulting from performance of the obligations of said owners set forth in this paragraph. 22.Elevations shown on this survey are based on GPS observations utilizing the AllTerra RTK Network. North American Vertical Datum of 1988 (Geoid 12B). 23.This area is serviced by Bolivar Water Supply Corporation, 4151 FM 455 West, Sanger, TX. (940) 458-3931. 24.Water is currently provided by well 25.Electric service provided by Coserve Electric, 1701 Lakeview Blvd., Denton, TX (940) 383-1671. GENERAL NOTES = TEMPORARY BENCHMARKTBM 72 Item 8. PAGE 2 OF 2FINAL PLAT MO ADDITION LOT 1, BLOCK A 1 LOT / 38.16 ACRES BEING ALL OF A CALLED 37.93 ACRE TRACT, 0.13 ACRE TRACT & 0.066 ACRE TRACT RECORDED IN DOC. NO. 2018-11604, 2022-4118 & 2018-43754, OFFICIAL RECORDS, DENTON COUNTY, TEXAS, IN THE P. BLACK SURVEY, ABSTRACT No. 103, E.HALL SURVEY, ABSTRACT No. 1523 IN THE ETJ OF THE CITY OF SANGER, DENTON COUNTY, TEXAS DATE OF PREPARATION: 1/17/2023 OWNER'S CERTIFICATE & DEDICATION STATE OF TEXAS § COUNTY OF DENTON § WHEREAS, SELVIN DAVID LOPEZ MERIDA and VERONICA REMEDIOS OLVERA are the sole owners of a 38.16 acre tract of land out of the P. BLACK SURVEY, ABSTRACT NUMBER 103 and the E. HALL SURVEY, ABSTRACT NUMBER 1523, situated in the Extraterritorial Jurisdiction of the City of Sanger, Denton County, Texas, and being all of a called 37.93 acre tract of land conveyed to Selvin David Lopez Merida and Veronica Remedios Olvera by Special Warranty Deed with Vendor's Lien of record in Document Number 2018-11604 of the Official Records of Denton County, Texas, being all of a called 0.13 acre tract of land conveyed to Selvin David Lopez Merida and Veronica Remedios Olvera by Warranty Deed of record in Document Number 2022-4118 of the Official Records of Denton County, Texas, being all of a called 0.066 acre tract of land conveyed to Selvin David Lopez Merida and Veronica Remedios Olvera by Special Warranty Deed of record in Document Number 2018-43754 of the Official Records of Denton County, Texas, and being more particularly described as follows: BEGINNING, at a 1/2" iron rod with orange plastic cap stamped "KAZ" found in the south right-of-way line of Farm-to-Market Road 455 (variable width right-of-way), being the northeast corner of a called 9.922 acre tract of land conveyed to Allen Adam Serrano and Karen Sue Serrano by Warranty Deed of record in Document Number 1995-19882 of the Official Records of Denton County, Texas, being the northwest corner of said 37.93 acre tract, being the beginning of a non-tangent curve to the left; THENCE, In a northeasterly direction, along said non-tangent curve to the left, along the south right-of-way line of Farm-to-Market Road 455, being the common north lines of said 37.93 acre tract, said 0.13 acre tract and said 0.066 acre tract, having a radius of 2914.79 feet, a chord bearing of N68°12'54"E, a chord length of 54.18 feet, a delta angle of 01°03'54", an arc length of 54.19 feet to 1/2" iron rod with green plastic cap stamped "EAGLE SURVEYING" set at the northwest corner of a called 15.789 acre tract of land conveyed to Robert Hughey and Amber Hughey by Warranty Deed with Vendor's Lien of record in Document Number 2018-89070 of the Official Records of Denton County, Texas, and the northeast corner of said 0.13 acre tract; THENCE, S00°22'08"W, along the west line of said 15.789 acre tract, being the common east line of said 0.13 acre tract, a distance of 296.42 feet to a 1/2" iron rod with green plastic cap stamped "EAGLE SURVEYING" set in the north line of said 37.93 acre tract, being the southwest corner of said 15.789 acre tract, and the southeast corner of said 0.13 acre tract; THENCE, S89°04'44"E, along the south line of said 15.789 acre tract, being the common north line of said 37.93 acre tract, a distance of 1292.38 feet to a 1/2" iron rod with green plastic cap stamped "EAGLE SURVEYING" set at the southeast corner of said 15.789 acre tract, being the southwest corner of Tract 3, Choctaw Ridge, an addition to the City of Sanger, according to the plat recorded in Cabinet F, Page 6 of the Plat Records of Denton County, Texas; THENCE, S89°14'06"E, along the south line of said Tract 3, being the common north line of said 37.93 acre tract, a distance of 48.35 feet to a point in a creek; THENCE, meandering along a creek, being the west lines of said Replat of Grissom Estates and Lot 2, Grissom Estates, an addition to the City of Sanger, according to the plat recorded in Document Number 2010-84 of the Plat Records of Denton County, Texas, being the common east line of said 37.93 acre tract, the following bearings and distances: 1.S68°40'36"W, a distance of 184.92 feet to a point in a creek; 2.S10°00'36"W, a distance of 67.91 feet to a point in a creek; 3.S59°39'48"E, a distance of 112.66 feet to a point in a creek; 4.S22°54'50"E, a distance of 145.58 feet to a point in a creek; 5.S09°17'04"E, a distance of 192.89 feet to a point in a creek; 6.S26°11'02"W, a distance of 85.53 feet to a point in a creek; 7.S65°16'50"W, a distance of 74.78 feet to a point in a creek; 8.THENCE, S03°00'37"E, a distance of 401.33 feet to a point in a creek at the southwest corner of said Lot 2 and the north corner of a called 23.52 acre tract of land described as Tract 2 conveyed John Harvey Reed, Jr. by General Warranty Deed of record in Document Number 2016-50155 of the Official Records of Denton County, Texas; THENCE, S33°42'34"W, along the west line of said Tract 2, being the common east line of said 37.93 acre tract, a distance of 282.29 feet to a 1/2" iron rod found at a northerly corner of said Tract 2 and the southeast corner of said 37.93 acre tract ; THENCE, N88°52'09"W, along the north line of said Tract 2 and a called 6.49 acre tract of land described as Tract 1 conveyed to John Harvey Reed, Jr. by General Warranty Deed of record in Document Number 2016-50155 of the Official Records of Denton County, Texas, being the common south line of said 39.73 acre tract, a distance of 1165.16 feet to a fence post found in the east line of said 9.922 acre tract, at the northwest corner of said Tract 1 and the southwest corner of said 39.73 acre tract; THENCE, N00°36'27"E, along the east line of said 9.922 acre tract, being the common west line of said 39.73 acre tract, a distance of 1533.92 feet to the POINT OF BEGINNING, containing 38.16 acres or 1,662,343 square feet, more or less. NOW THEREFORE KNOW ALL MEN BY THESE PRESENTS: THAT SELVIN DAVID LOPEZ MERIDA and VERONICA REMEDIOS OLVERA, acting herein by and through its duly authorized officer does hereby adopt this plat designating the hereinabove described property as MO ADDITION an addition to the City of Sanger, Texas, and does hereby dedicate to the public use forever by fee simple title, free and clear of all liens and encumbrances, all streets, thoroughfares, alleys, fire lanes, drive aisles, parks, and watercourses, and to the public use forever easements for sidewalks, storm drainage facilities, utilities, and any other property necessary to serve the plat and to implement the requirements of the subdivision regulations and other City codes and do hereby bind ourselves, our heirs, successors and assigns to warrant and to forever defend the title on the land so dedicated. Further, the undersigned covenants and agrees that he/she shall maintain all easements and facilities in a state of good repair and functional condition at all times in accordance with City codes and regulations. No buildings, fences, trees, shrubs, or other improvements or growths shall be constructed or placed upon, over, or across the easements as shown, except that landscape improvements may be installed, if approved by the City of Sanger. The City of Sanger and public entities shall have the right to access and maintain all respective easements without the necessity at any time of procuring permission from anyone. WITNESS MY HAND THIS _____ DAY OF __________, 2023. OWNERS: SELVIN DAVID LOPEZ MERIDA and VERONICA REMEDIOS OLVERA BY:____________________________________________________ SELVIN DAVID LOPEZ MERIDA Date STATE OF TEXAS § COUNTY OF DENTON § BEFORE ME, the undersigned authority, on this day personally appeared SELVIN DAVID LOPEZ MERIDA, known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same for the purposes and considerations therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF THE OFFICE this _______ day of __________________, 2023. _______________________________________ Notary Public in and for the State of Texas BY:____________________________________________________ VERONICA REMEDIOS OLVERA Date STATE OF TEXAS § COUNTY OF DENTON § BEFORE ME, the undersigned authority, on this day personally appeared VERONICA REMEDIOS OLVERA, known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same for the purposes and considerations therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF THE OFFICE this _______ day of __________________, 2023. _______________________________________ Notary Public in and for the State of Texas Drafter Project Date EN 02/23/2023 2005.033-03 EAGLE SURVEYING, LLC 222 S. Elm Street, Suite: 200 Denton, TX 76201 (940) 222-3009 TX Firm #10194177 PRELIMINARY this document shall not be recorded for any purpose and shall not be used or viewed or relied upon as a final survey document CERTIFICATE OF SURVEYOR STATE OF TEXAS § COUNTY OF DENTON § I, MATTHEW RAABE, Registered Professional Land Surveyor, do hereby certify that this plat was prepared from an actual survey made on the ground and that the monuments shown hereon were found or placed with 1/2-inch iron rods with green plastic caps stamped "EAGLE SURVEYING" under my direction and supervision in accordance with the current provisions of the Texas Administrative Code and the Ordinances of the City of Sanger, Denton County, Texas. _____________________________________________________ Matthew Raabe, R.P.L.S. # 6402 Date STATE OF TEXAS § COUNTY OF DENTON § BEFORE ME, the undersigned authority, on this day personally appeared MATTHEW RAABE, known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same for the purposes and considerations therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF THE OFFICE this ____ day of ______________, 2023. ___________________________________________ Notary Public in and for the State of Texas PRELIMINARY PLAT FOR REVIEW PURPOSES ONLY Approved for Preparation of a Final Plat ______________________________________ ___________________________ Chairman, Planning & Zoning Commission Date City of Sanger, TX ______________________________________ ___________________________ Mayor, Date City of Sanger, TX ______________________________________ ___________________________ City Secretary Date City of Sanger, TX SURVEYOR Eagle Surveying, LLC Contact: Brad Eubanks 222 S. Elm Street, Suite: 200 Denton, TX 76201 (940) 222-3009 OWNER Selvin David Lopez Merida & Veronica Remedios Olvera 2512 Craig Lane Denton, TX 76209 (940) 458-1993 ENGINEER Development Engineering Consultants, LLC Contact: Shawn Rockenbaugh 5300 Town & Country Boulevard, Suite 150 Frisco, TX 75034 (469) 850-0060 FINAL PLAT 73 Item 8. 1-18-2023 1-18-2023 74 Item 8. DEC · 5300 Town & Country Boulevard, Suite 150 · Frisco, Texas 75034 · 469-850-0060 January 18, 2023 City of Sanger Development Services 201 Bolivar Street Sanger, TX, 76266 Re: Letter of Intent Mo Addition Lot 1, Block A Sanger ETJ DEC 10363. Dear: City of Sanger Development Services As required by the City of Sanger Subdivision Application requirements, this letter is to serve as a Letter of Intent to plat the subject tract as one lot. The subject property is a 38.16-acre tract of land out of the P. Plack Survey, Abstract Number 103 and the E. Hall Survey, Abstract Number 1532, situated in the Extraterritorial Jurisdiction of the City of Sanger. The subject tract being all of a Special Warranty deeds Document Number 2018-11604 and 2022-4118 of the Official Records of Denton County, Texas. The owner of the properties being Selvin David Lopez Merida and Veronica Remedios Olvera, wish to subdivide the property into three lots. The owner address being 9826 Angel Bend, Denton, TX 76208. The point of contact for the application and platting process will be Shawn Rockenbaugh. Point of contact address is 5300 Town & Country Boulevard #150, Frisco TX 75034. Phone 469-850- 0060 and email shawn@dec-en.com. The intent to the application is to plat the current property into one lot through the Minor Plat process. The purpose of subdivision is to allow possibility of future development of the property. The property lies off of and has access FM 455 west of the City of Sanger and lies within the City of Sanger extraterritorial jurisdiction. The current property contains a single-family residence. The applicant an Owner request that the City of Sanger Planning Staff, and required approval bodies review and act upon the Minor plat application for Mo Addition, Lot 1, Block A. We request that the previous plat submittal showing three lots be pulled from consideration. Sincerely, Shawn Rockenbaugh Sr. Project Manager Development Engineering Consultants, LLC 75 Item 8. CITY COUNCIL COMMUNICATION DATE: March 6, 2023 FROM: Shani Bradshaw, Director of Economic Development AGENDA ITEM: Consideration and possible action on the Purchase and Sales Agreement for Lot 2R and 3R, Block A, Sanger Industrial Addition, Lots 1R, 2R & 3R, a Subdivision in Denton, County, Texas. SUMMARY: 4A Industrial Development Corporation will consider this agreement at their board meeting on Tuesday, February 28, 2023. FISCAL INFORMATION: Budgeted: NA Amount: $1,500,000.00 GL Account: NA RECOMMENDED MOTION OR ACTION: Recommend Approval. ATTACHMENTS:  Purchase and Sales Agreement for Warehouse  Commitment for Title  Warehouse Survey 76 Item 9. PURCHASE AND SALE AGREEMENT between Sanger Texas Industrial Development Corporation and City of Sanger dated as of March 6, 2023 77 Item 9. 2 PURCHASE AND SALE AGREEMENT This PURCHASE AND SALE AGREEMENT (this "Agreement"), dated as of March 6, 2023 (the "Effective Date"), is entered into between the Sanger Texas Industrial Development Corporation , a Texas non-profit corporation ("Seller") having an address at 201 Bolivar Street, Sanger, Tx 76266 and the City of Sanger, a Texas Home Rule Municipal Corporation ("Purchaser") having an address at 502 Elm Street, P.O. Box 1729, Sanger, Texas 76266. RECITALS WHEREAS, Seller is the owner of the Property (as hereinafter defined); and WHEREAS, subject to the terms and conditions hereof, Seller desires to sell to Purchaser the Property and Purchaser desires to purchase the Property from Seller. NOW, THEREFORE, in consideration of the mutual covenants and agreements hereinafter set forth and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the parties hereto agree as follows: ARTICLE I DEFINITIONS The following terms have the meanings specified or referred to in this ARTICLE I: "Agreement" has the meaning set forth in the preamble. "Closing" has the meaning set forth in Section 4.01(a). "Closing Date" has the meaning set forth in Section 4.01(a). "Confidential Information" has the meaning set forth in Section 12.01. "Deposit" has the meaning set forth in Section 3.01(a). "Escrow Agent" has the meaning set forth in Section 3.01(a). "Improvements" has the meaning set forth in the Section 2.01(b). "Land" has the meaning set forth in Section 2.01(a). "Leases" has the meaning set forth in Section 2.01(e). "Notices" has the meaning set forth in Section 9.01. "OFAC" has the meaning set forth in Section 6.01(f). "Permitted Exceptions" has the meaning set forth in Section 5.02. 78 Item 9. 3 "Property" has the meaning set forth in Section 2.01. "Purchase Price" has the meaning set forth in Section 3.01. "Purchaser" has the meaning set forth in the preamble. "Purchaser Default" has the meaning set forth in Section 10.01(a). "Purchaser Related Party" shall mean collectively any Purchaser agent, advisor, representative, affiliate, employee, director, partner, member, beneficiary, investor, servant, shareholder, trustee, or other person or entity acting on Purchaser's behalf or otherwise related to or affiliated with Purchaser. "Purchaser's Survey" has the meaning set forth in Section 5.03(a)(ii). ""Seller" has the meaning set forth in the preamble. "Seller Related Party" shall mean collectively any Seller agent, advisor, representative, affiliate, employee, director, partner, member, beneficiary, investor, servant, shareholder, trustee, or other person or entity acting on Seller's behalf or otherwise related to or affiliated with Seller. "Seller's Survey" has the meaning set forth in Section 5.02(c). "Title Commitment" has the meaning set forth in Section 5.03(a)(i). "Title Insurance Company" has the meaning set forth in Section 5.01. "Title Objection Date" has the meaning set forth in Section 5.03(b). "Title Objection Notice" has the meaning set forth in Section 5.03(b). "Transaction Parties" has the meaning set forth in Section 12.01. "Violations" has the meaning set forth in Section 5.05. "Voluntary Liens" has the meaning set forth in Section 5.04(d). ARTICLE II CONVEYANCE OF THE PROPERTY Section 2.01 Subject of Conveyance. Seller agrees to sell and convey to Purchaser and Purchaser agrees to purchase from Seller, upon the terms and conditions hereinafter set forth, all right, title, and interest of Seller in and to the following (collectively referred to herein as the "Property"): (a) All that certain lot, piece, or parcel of land located at Lot 2R and 3R, Block A, SANGER INDUSTRIAL ADDITION, LOTS 1R, 2R & 3R, Sanger, County of Denton and State of Texas, as more particularly bounded and described in Exhibit A attached hereto and hereby made a part hereof (the "Land"); 79 Item 9. 4 (b) All buildings and improvements located on the Land and all of Seller's right, title, and interest in and to any and all fixtures attached thereto (collectively, the "Improvements"); (c) All equipment, machinery, apparatus, appliances, and other articles of personal property located on and used in connection with the operation of the Improvements (collectively, the "Personal Property"), to the extent any of same are owned by Seller; (d) All rights appurtenant to the Land, if any, including without limitation, any strips and gores abutting the Land, and any land lying in the bed of any street, road, or avenue in front of, or adjoining the Land, to the center line thereof; (e) All other rights, privileges, easements, licenses, appurtenances, and hereditaments relating to the Property. Notwithstanding anything herein to the contrary, "Property" does not include any tenant fixtures or other property belonging to the tenants at the Property, or any item leased from third-parties. Section 2.02 AS-IS. (a) Subject to Section 5.03 of this Agreement, Purchaser acknowledges that Purchaser has made thorough inspections and investigations of the Property and Purchaser agrees to take title to the Property "AS-IS, WHERE IS, AND WITH ALL FAULTS" and in the condition existing as of the date of this Agreement, subject to reasonable use, ordinary wear and tear, and without any reduction in or abatement of the Purchase Price. Purchaser has undertaken all such investigations of the Property as Purchaser deems necessary or appropriate under the circumstances as to the status of the Property and the existence or non-existence of curative action to be taken with respect to any hazardous or toxic substances on or discharged from the property, and based upon same, Purchaser is and will be relying strictly and solely upon such inspections and examinations and the advice and counsel of its own consultants, agents, legal counsel, and officers. (b) Neither party to this Agreement is relying on any statement or representation not expressly stated in this Agreement. Purchaser specifically confirms and acknowledges that in entering into this Agreement, Purchaser has not been induced by, and has not relied upon, whether express or implied, warranties, guaranties, promises, statements, inducements, representations, or information pertaining to the Property or its uses, the physical condition, environmental condition, state of title, income, expenses, or operation of the Property, or any other matter or thing with respect thereto, written or unwritten, whether made by Seller or any agent, employee, or other representative of Seller, or any broker or any other person representing (or purporting to represent) Seller, which are not expressly set forth in this Agreement. Seller shall not be liable for or bound by any written or unwritten statements, representations, warranties, brokers' statements, or other information pertaining to the Property furnished by Seller, any broker, any agent, employee, or other actual (or purported) representative of Seller, or any person, unless and only to the extent the same are expressly set forth in this Agreement. (c) Seller makes no warranty with respect to the presence of any hazardous or toxic substances on, above, beneath, or discharged from the Property (or any adjoining or neighboring property) or in any water on or under the Property. The Closing hereunder shall be deemed to 80 Item 9. 5 constitute an express waiver of Purchaser's right to recover from Seller, and upon the Closing, Purchaser forever releases, covenants not to sue, and discharges Seller from, any and all damages, demands, claims, losses, liabilities, penalties, fines, liens, judgments, costs, or expenses whatsoever, including attorneys' fees and costs, whether direct or indirect, known or unknown, foreseen or unforeseen, that may arise on account of or in any way be connected with the physical condition of the Property. (d) The provisions of this Section 2.02 shall survive the Closing and shall not be deemed to have merged into any of the documents executed or delivered at the Closing. ARTICLE III PURCHASE PRICE Section 3.01 Purchase Price and Deposit. The purchase price to be paid by Purchaser to Seller for the Property is One Million Five Hundred Thousand and No/100 Dollars ($1,500,000) (the "Purchase Price"). The Purchase Price shall be payable as follows: (a) Simultaneously with the execution and delivery of this Agreement by Purchaser, the sum of Ten and No/100 Dollars ($10) and additional, independent consideration in the amount of Ten and No/100 Dollars ($10) together with any interest earned thereon, (collectively, the "Deposit") by Purchaser's wire transfer of immediately available federal funds to Michelle Neely as escrow agent ("Escrow Agent"), to an account at such bank as designated by Escrow Agent. The receipt of the Deposit is hereby acknowledged and Escrow Agent agrees to hold the Deposit in escrow pursuant to the terms of ARTICLE XI of this Agreement. Any interest earned on the principal portion of the Deposit shall be deemed to be part of the Deposit and shall be paid together with the principal portion of the Deposit, it being understood and agreed that if the transaction contemplated under this Agreement closes, any interest earned on the Deposit shall not be credited to the Purchase Price upon the Closing and shall, upon the Closing, be and remain the property of Seller. (b) The balance of the Purchase Price in the amount of One Million Four Hundred and Ninety-Nine Thousand Nine Hundred and Ninety and No/100 Dollars ($1,499,990) shall be paid to Seller on the Closing Date, subject to any credits or apportionments as provided for under this Agreement, simultaneously with delivery of the deed, by one or more wire transfers of immediately available federal funds to an account, or accounts, designated in writing by Escrow Agent no later than thirty (30) days prior to the Closing Date. Section 3.02 No Financing. Purchaser expressly agrees and acknowledges that Purchaser's obligations to pay the Purchase Price and otherwise consummate the transactions contemplated hereby are not in any way conditioned upon Purchaser's ability to obtain financing of any type or nature whatsoever (i.e., whether by way of debt financing, equity investment, or otherwise). 81 Item 9. 6 ARTICLE IV CLOSING Section 4.01 Closing Date. (a) The closing of the transaction contemplated by this Agreement (the "Closing") shall take place on March 31, 2023 or on such later date as provided under Section 4.01(b) of this Agreement (the "Closing Date") through an escrow closing with Title Insurance Company. Purchaser acknowledges and agrees that TIME SHALL BE OF THE ESSENCE with respect to the performance by Purchaser of its obligations to purchase the Property, pay the Purchase Price, and otherwise consummate the transactions contemplated in this Agreement on the Closing Date.] (b) Pursuant to Section 5.04(a) of this Agreement, Seller shall have the right to adjourn the Closing Date. Section 4.02 Seller's Closing Deliverables. At the Closing, Seller shall deliver or cause to be delivered to Purchaser, the following executed, certified, and acknowledged by Seller, as appropriate: (a) A special warranty deed, executed with the appropriate acknowledgement form and otherwise in proper form for recording so as to convey title to the Property as required by this Agreement. The delivery of the special warranty deed by Seller, and the acceptance by Purchaser, shall be deemed the full performance and discharge of every obligation on the part of Seller to be performed pursuant to this Agreement, except those obligations of Seller that are expressly stated in this Agreement to survive the Closing. (b) A bill of sale whereby Seller conveys to Purchaser all of Seller's right, title, and interest in and to the Personal Property, equipment, and other tangible property included in this sale, together with all state and local sales tax returns, and payment of all sales taxes payable in connection with such conveyance of Personal Property. The bill of sale will be delivered without any Seller representations or warranties. (c) In connection with the Leases, Seller shall deliver to Purchaser: (i) Originals of all Leases, if in Seller's possession, or copies certified by Seller as being true, correct, and complete; (ii) An updated and current rent roll certified by Seller as being true, correct, and complete along with a list of any tenants who are delinquent in their payment of rent and the amount of rent that remains outstanding, if any, dated no more than fifteen (15) days prior to Closing; (iii) An updated and current schedule of all security deposits under the Leases along with a check, or credit to Purchaser, in the amount of any cash security deposits, including any interest thereon payable to Purchaser, held by Seller pursuant to the Leases on the Closing Date; and if any security deposit is in the form of a letter of credit, Seller shall coordinate for the transfer of any such letter of credit to Purchaser on the Closing Date; 82 Item 9. 7 (iv) An executed counterpart to an assignment and assumption agreement relating to the Leases and specifically providing: (A) Seller's assignment of the Leases and Purchaser's assumption of the Leases; (B) no representations and warranties from Seller relating to the Leases other than as expressly set forth in this Agreement; (C) Seller's agreement to indemnify, defend, and hold harmless Purchaser from and against all claims, actions, proceedings, losses and liabilities, and expenses arising from Seller's failure to perform its obligations under the Leases as landlord and accruing prior to the Closing Date; and (D) Purchaser's agreement to indemnify, defend, and hold harmless Seller from and against all claims, actions, proceedings, losses and liabilities, and expenses arising from Purchaser's failure to perform its obligations under the Leases as landlord accruing from and after the Closing Date; and (v) Originally executed tenant notice letters to each of the tenants under the Leases advising them of the sale of the Property to Purchaser, the transfer of the tenants' security deposits to Purchaser (where applicable) and directing the tenants to thereafter deliver all notices to Purchaser and pay all rents or other payments directly to Purchaser, or its agent, as provided in the notice letter. (d) A certification that Seller is not a "foreign person" as such term is defined in Section 1445 of the Internal Revenue Code, as amended and the regulations thereunder, which certification shall be signed under penalty of perjury. (e) Originals, or copies certified by Seller as being complete, of all applicable bills, invoices, and other items that shall be apportioned as of the Closing Date. (f) A consent of the board of directors of Seller authorizing the transaction contemplated hereby and the execution and delivery of the documents required to be executed and delivered hereunder. (g) Seller's original closing statement and any disclosure forms required under federal and/or state law. (h) All keys and access codes to any portion of the Property, to the extent in Seller's possession or control. (i) All other documents reasonably necessary or otherwise required by Escrow Agent and Title Insurance Company to consummate the transaction contemplated by this Agreement. Section 4.03 Purchaser's Closing Deliverables. At the Closing, Purchaser shall deliver or cause to be delivered to Seller, the following, executed, certified, and acknowledged by Purchaser, as appropriate: (a) The balance of the Purchase Price as set forth in Section 3.01(b). (b) An acknowledgment receipt of the copies (or originals) of the Leases delivered by Seller. 83 Item 9. 8 (c) An acknowledgment receipt for the security deposits under the Leases and interest thereon assigned to Purchaser. Said receipt shall contain Purchaser's agreement to indemnify and hold Seller harmless from and against all liability, claim, loss, damage, or expense, including reasonable attorneys' fees, incurred in connection with, or arising or asserted with respect to, said security deposits and interest. (d) One (1) original Notice to Tenant executed by Purchaser to each of the tenants under the Leases. (e) Purchaser's original closing statement and any disclosure forms required under federal and/or state law. (f) Purchaser shall, where applicable, join with Seller in the execution and delivery of the closing documents and instruments required under Section 4.02 of this Agreement. (g) A consent of the City Council of Purchaser authorizing the transaction contemplated hereby and the execution and delivery of the documents required to be executed and delivered hereunder. (h) All other documents reasonably necessary or otherwise required by Escrow Agent and Title Insurance Company to consummate the transaction contemplated by this Agreement. Section 4.04 Closing Costs. (a) Seller and Purchaser shall each pay the fees and expenses of its own counsel in connection with the preparation and negotiation of this Agreement. The deed and other agreements and instruments related to the transaction contemplated by this Agreement and such legal costs shall not be part of the closing costs; provided, however, that if any legal action is instituted under this Agreement, the prevailing party in such action shall be entitled to recover from the other party costs related to such legal action, including reasonable attorneys' fees and costs in all trial, appellate, post-judgment, and bankruptcy proceedings. (b) Seller shall pay: (i) The commission owed to the Broker, if any, pursuant to ARTICLE XIII of this Agreement; (ii) All recording fees for the release of any liens on the Property, as required pursuant to the terms of this Agreement; and (iii) The title insurance premium charged by Title Insurance Company for Purchaser's owner's title insurance policy. (c) Purchaser shall pay: (i) Title Insurance Company charges for title endorsements to Purchase's owner's policy as well as the premium for a loan policy required by Purchaser's lender, if any; 84 Item 9. 9 (ii) The costs related to the Purchaser's Survey and any other survey or survey update; (iii) Any other fees or costs related to Purchaser's due diligence reviews; (iv) Any transfer fees charged by the issuer of any letters of credit; and (v) All costs related to the recording fees payable in connection with the recording of the deed and Purchaser's lender's security instruments, if any. Section 4.05 Apportionments. The following shall be apportioned as of 11:59 p.m. Central Time of the date immediately preceding the Closing Date, unless expressly provided for otherwise: (a) Seller shall pay for any and all real estate taxes due and payable before the Closing. Purchaser shall pay for any and all real estate taxes due and payable on or after the Closing. No real estate tax credit or proration shall be given to Purchaser by Seller. If the Property shall be, or has been, affected by any assessments or special assessments payable in a lump sum or which are, or may become, payable in installments, of which the first installment is then a charge or lien, or has already been paid, then at the Closing such amounts will be paid or apportioned, as the case may be, in the following manner: (i) Any such assessments or installments, or portion thereof, payable on or after the Closing Date shall be the responsibility of Purchaser; and (ii) Any such assessments or installments, or portion thereof, payable prior to the Closing Date shall be the responsibility of Seller. The obligations contained in this Section 4.05(a) shall survive the Closing and shall not be merged into the Deed. (b) All water and sewer charges based on the fiscal year for which they are assessed, unless the meters are read on the date immediately preceding the Closing Date; provided, however, that if any such charges or rents are payable by any tenant under the Leases, such charges or rents shall not be apportioned. (c) Utilities, fuel, gas, and electric charges based on most recently issued bills, unless: (i) the meters are read on the date immediately preceding the Closing Date; or (ii) the Purchaser has opened its own accounts as of the Closing Date; provided, however, that if any such charges are payable by any tenant under the Leases, such charges shall not be apportioned. (d) Any leasing commissions due to any broker or leasing agent on or after the date hereof in connection with any Leases. (e) All other items customarily apportioned in connection with sales of buildings substantially similar to the Property in the State of Texas. Section 4.06 Miscellaneous. Any miscellaneous adjustments payable by either Purchaser or Seller, as the case may be, that occur at the Closing may be paid at the Closing by delivery of personal or business checks; provided, however, that such miscellaneous adjustments do not exceed ($500.00). 85 Item 9. 10 Any errors in calculations or apportionments shall be corrected or adjusted as soon as practicable after the Closing Date. The provisions of this Section 4.06 and Section 4.05 shall survive the Closing Date. ARTICLE V TITLE MATTERS AND VIOLATIONS Section 5.01 Acceptable Title. Seller shall convey, and Purchaser shall accept, such title to the Property that any title insurance company authorized and licensed to do business in Texas (the "Title Insurance Company") would be willing to insure, subject to the matters set forth in this Agreement. Seller shall convey, and Purchaser shall accept, fee simple title to the Property in accordance with the terms and conditions of this Agreement, and subject to: (a) The Permitted Exceptions; and (b) Such other matters as any Title Insurance Company shall be willing to omit as exceptions to coverage or to except with insurance against collection out of or enforcement against the Property. Section 5.02 Permitted Exceptions. The Property shall be sold, assigned, and conveyed by Seller to Purchaser, and Purchaser shall accept and assume same, subject to the following matters (collectively, the "Permitted Exceptions"): (a) Any and all present and future zoning, building, environmental and other laws, statutes, ordinances, codes, rules, regulations, requirements, or executive mandates of all governmental authorities having jurisdiction with respect to the Property, including, without limitation, landmark designations and all zoning variances and special exceptions, if any; provided, however, that the same are not violated by the Improvements or prohibit or impair the continued use of the Property as it is being used on the date of this Agreement. (b) Possible encroachments and/or projections of stoop areas, roof cornices, window trims, vent pipes, cellar doors, steps, columns and column bases, flue pipes, signs, piers, lintels, window sills, fire escapes, satellite dishes, protective netting, sidewalk sheds, ledges, fences, coping walls (including retaining walls and yard walls), air conditioners, and the like, if any, on, under or above any street or highway, the Property or any adjoining property, provided, however, that the same do not impact the value of the Property or impair the continued use of the Property as it is being used on the date of this Agreement. (c) The state of facts shown on that certain survey made by Landmark Surveyors, LLC dated January 24, 2023 ("Seller's Survey") and any additional state of facts a new or updated survey or personal inspection would show, provided the additional facts do not render title uninsurable in Texas. (d) Rights of tenants of the Property pursuant to the Leases and any and all amendments, assignments, subleases, with Seller, or any predecessor fee owner of the Property or other statutory tenants, and others claiming by, through, and under such tenants. 86 Item 9. 11 (e) All presently existing and future liens for unpaid real estate taxes, assessments, and water and sewer charges that are not due and payable as of the Closing Date, subject to any apportionments as provided for in this Agreement. (f) All covenants, restrictions and rights of record, and all easements and agreements of record for the erection and/or maintenance of water, gas, steam, electric, telephone, sewer or other utility pipelines, poles, wires, conduits, or other like facilities, and appurtenances thereto, over, across, and under the Property; provided, however, that the same are not violated by the Improvements and do not impose any monetary obligation on the owner of the Property. (g) Party walls and party wall rights, beams and beam rights, the possible revocable nature of or lack of right to maintain vaults or other improvements or installations beyond building or property lines. (h) Variations between tax lot lines and lines of record title provided same do not render title uninsurable in Texas. (i) Any lien or encumbrance (including, without limitation, any mechanics lien and materialmen's lien) the removal of which is the obligation of a tenant. (j) Any lien or encumbrance arising out of the acts or omissions of Purchaser. (k) Consents by Seller or any former owner for the erection and maintenance of any structures on, under, or above any streets or roads on which the Property may abut, provided same do not render title unmarketable. (l) Any financing statements filed on a date more than five (5) years prior to the Closing Date and not renewed, and any financing statements, chattel mortgages, encumbrances, or mechanics' or other liens filed against the against property or equipment which is not part of the Property or is owned by tenants. (m) Any exceptions disclosed on Schedule B of the Title Commitment (as hereinafter defined) which will be extinguished upon the transfer of the Property. (n) Any exceptions disclosed on Schedule B of the Title Commitment which are the responsibility of any tenant under the Leases to cure, correct, and remove of record. (o) The standard conditions and exceptions to title contained in the form of title policy or a revised post "mark-up" Title Commitment issued to Purchaser by Title Insurance Company. (p) Such other matters as any reputable title insurer licensed to do business in Texas shall be willing, without special premium, to omit as exceptions to title insurance coverage. (q) The matters set forth on Exhibit D attached to this Agreement. Section 5.03 Title. 87 Item 9. 12 (a) Purchaser shall promptly order, at its sole cost and expense: (i) A commitment for title insurance from the Title Insurance Company, together with true, legible copies (to the extent available) of all instruments giving rise to any defects or exceptions to title to the Property (collectively, the "Title Commitment"), which Title Commitment shall be delivered both Purchaser and Seller concurrently; and (ii) Either an update of Seller's Survey or a new survey of the Property, prepared by a surveyor licensed in Texas ("Purchaser's Survey"), which Purchaser's Survey shall be delivered to counsel for both Purchaser and Seller concurrently. (b) Purchaser shall deliver to Seller in writing, any objections to the exceptions to title set forth in the Title Commitment or Purchaser's Survey, other than the Permitted Exceptions (collectively, "Title Objection Notice"), by no later than 12:00 pm Central Time on the date that is fifteen (15) days after the Effective Date ("Title Objection Date"). The failure by Purchaser, or Purchaser's attorney, to deliver the Title Objection Notice on or before the Title Objection Date shall constitute Purchaser's irrevocable acceptance of the Title Commitment and Purchaser's Survey and Purchaser shall be deemed to have unconditionally waived any right to object to any matters set forth therein. If, after giving the Title Objection Notice to Seller and Seller's attorney, Purchaser receives any amendment or update to the Title Commitment or to Purchaser's Survey showing any title defects which Purchaser claims are not Permitted Exceptions, Purchaser shall give written notice thereof to Seller immediately after the date Purchaser receives such evidence and Purchaser shall be deemed to have unconditionally waived any such matters of which it fails to give such notice to Seller within fifteen (15) days after the date Purchaser receives same. Purchaser acknowledges and agrees that TIME IS OF THE ESSENCE with respect to all time periods relating to Purchaser's obligations set forth in this Section 5.03. Section 5.04 Seller's Inability to Convey. (a) If, on the Closing Date, Seller fails or is unable to convey title to the Property in accordance with this Agreement, Seller shall be entitled, upon written notice delivered to Purchaser on or prior to the Closing Date, to reasonable adjournments of the Closing one or more times for a period not to exceed thirty (30) days in the aggregate to enable Seller to convey such title to the Property. (b) If Seller does not so elect to adjourn the Closing, and on the Closing Date, fails or is unable to convey title subject to and in accordance with the provisions of this Agreement, Purchaser shall be entitled, to either: (i) terminate this Agreement by written notice to Seller and Escrow Agent delivered on or before the Closing Date, in which event Purchaser shall be entitled to a return of the Deposit minus the independent consideration, and this Agreement shall thereupon be deemed terminated and of no further effect, and neither party hereto shall have any obligations to the other hereunder or by reason hereof, except for the provisions hereof that expressly survive termination of this Agreement; or (ii) complete the purchase (with no reduction in the Purchase Price) with such title as Seller is able to convey on the Closing Date. 88 Item 9. 13 (c) If Seller elects to adjourn the Closing as provided in Section 5.04(a) above, this Agreement shall remain in effect for the period or periods of adjournment, in accordance with its terms. If, on the adjourned Closing Date, Seller fails or is unable to convey title to the Property subject to and in accordance with the provisions of this Agreement, Purchaser shall make its election between clauses (i) and (ii) of Section 5.04(b) above, by written notice to Seller given not later than the adjourned Closing Date. If Purchaser shall fail to give such notice as aforesaid, Purchaser shall be deemed to have elected clause (ii) above and the Closing shall take place on the adjourned Closing Date. (d) Notwithstanding anything to the contrary contained in this Agreement, Seller shall not be required to take or bring any action or proceeding or any other steps to remove any defect in or objection to title or to fulfill any condition precedent to Purchaser's obligations under this Agreement or to expend any moneys therefor, nor shall Purchaser have any right of action against Seller therefor, at law or in equity, except that Seller shall, on or prior to the Closing, pay, discharge, or remove of record or cause any Voluntary Lien to be paid, discharged, or removed of record at Seller's sole cost and expense. The term "Voluntary Liens" as used herein shall mean any lien and other encumbrances (other than Permitted Exceptions) which: (i) Seller has knowingly and intentionally placed (or allowed to be placed) on the Property, including, without limitation, mortgages and mechanics' liens; (ii) are in a liquidated amount; and (iii) may be satisfied solely by the payment of money. For all Voluntary Liens, other than mortgages and mechanics liens, Seller shall have no obligation to pay, discharge, or remove of record Voluntary Liens, in the aggregate, in an amount greater than No/100 Dollars ($100.00). (e) Notwithstanding anything in this Section 5.04 above to the contrary, Purchaser may at any time accept such title as Seller can convey, without reduction of the Purchase Price or any credit or allowance on account thereof or any claim against Seller. The acceptance of the Deed by Purchaser shall be deemed to be full performance of, and discharge of, every agreement and obligation on Seller's part to be performed under this Agreement, except for such matters which are expressly stated to survive the Closing hereunder. Section 5.05 Violations. Notwithstanding anything to the contrary in this Agreement, Purchaser shall accept title to the Property subject to any and all violations or any notes or notices of violations of law or municipal ordinances, orders, or requirements noted or issued prior to, on, or after the date of this Agreement (collectively, the "Violations"), if any. Purchaser acknowledges and accepts that Seller shall not be obligated to comply with, or take any action or incur any expense in connection with any Violations. If requested by Purchaser, Seller shall furnish Purchaser with an authorization to make any required violation searches against the Property. ARTICLE VI REPRESENTATIONS AND WARRANTIES Section 6.01 Seller's Representations and Warranties. Seller represents and warrants to Purchaser on and as of the date of this Agreement and on and as of the Closing Date as set forth in this Section 6.01: (a) Seller is a non-profit corporation duly organized, validly existing and in good standing under the laws of the State of Texas. 89 Item 9. 14 (b) The execution, delivery, and performance of this Agreement by Seller and all agreements, instruments, and documents herein provided to be executed by Seller on the Closing Date: (i) do not violate the Articles of Incorporation of Seller, or any contract, agreement, commitment, lease, order, judgment, or decree to which Seller is a party; and (ii) have been duly authorized by the resolutions of the board of directors of Seller and the appropriate and necessary action has been taken by such board of directors on the part of Seller. This Agreement is valid and binding upon Seller, subject to bankruptcy, reorganization, and other similar laws affecting the enforcement of creditors' rights generally. (c) Seller is not a "foreign person" as such term is defined in Section 1445 of the Internal Revenue Code or any regulations promulgated thereunder, as amended. (d) To Seller's actual knowledge, there is no pending or threatened litigation or condemnation action against the Property or against Seller with respect to the Property as of the date of this Agreement. (e) Seller has not entered into any service or equipment leasing contracts relating to the Property. (f) Seller is not, and will not become, a person or entity with whom United States persons or entities are restricted or prohibited from doing business under regulations of the Office of Foreign Asset Control ("OFAC") of the Department of the Treasury (including those named on OFAC's specially designated and blocked persons list) or under any statute, executive order (including the September 24, 2001, Executive Order Blocking Property and Prohibiting Transactions With Persons Who Commit, Threaten to Commit, or Support Terrorism), or other governmental action and is not and will not engage in any dealings or transactions or be otherwise associated with such persons or entities. Section 6.02 Purchaser's Representations and Warranties. Purchaser represents and warrants to Seller on and as of the date of this Agreement and on and as of the Closing Date as set forth in this Section 6.02: (a) Purchaser is a Home Rule Municipal Corporation duly organized, validly existing, and in good standing under the laws of the State of Texas. (b) The execution, delivery, and performance of this Agreement by Purchaser and all agreements, instruments, and documents herein provided to be executed by Purchaser on the Closing Date: (i) do not violate the Charter of Purchaser, or any contract, agreement, commitment, lease, order, judgment, or decree to which Purchaser is a party; and (ii) have been duly authorized by the resolutions of the City Council of Purchaser and the appropriate and necessary action has been taken by the Mayor on the part of Purchaser. This Agreement is valid and binding upon Purchaser, subject to bankruptcy, reorganization, and other similar laws affecting the enforcement of creditors' rights generally. (c) Purchaser has not violated any contract, agreement, or other instrument to which Purchaser is a party nor any judicial order, judgment, or decree to which Purchaser is bound by: (i) entering into this Agreement; (ii) executing any of the documents Purchaser is obligated to execute and deliver on the Closing Date; or (iii) performing any of its duties or obligations under 90 Item 9. 15 this Agreement or otherwise necessary to consummate the transactions contemplated by this Agreement. (d) There are no actions, lawsuits, litigation, or proceedings pending or threatened in any court or before any governmental or regulatory agency that affect Purchaser's power or authority to enter into or perform this Agreement. There are no judgments, orders, or decrees of any kind against Purchaser unpaid or unsatisfied of record, or, to the best of Purchaser's knowledge, threatened against Purchaser, which would have any material adverse effect on the business or assets or the condition, financial or otherwise, of Purchaser or the ability of Purchaser to consummate the transactions contemplated by this Agreement. (e) Except for the express representations and warranties of Seller found in Section 6.01, Purchaser is acquiring the Property on an "AS IS, WHERE IS" basis, without any representation or warranty of any kind or nature whatsoever, express or implied, and Purchaser acknowledges that no such representations or warranties have been made except as set forth in writing herein. In deciding whether to acquire the Property, Purchaser is relying solely on Purchaser's investigation of the Property. (f) Purchaser is not, and will not become, a person or entity with whom United States persons or entities are restricted or prohibited from doing business under regulations of OFAC (including those named on OFAC's specially designated and blocked persons list) or under any statute, executive order (including the September 24, 2001, Executive Order Blocking Property and Prohibiting Transactions With Persons Who Commit, Threaten to Commit, or Support Terrorism), or other governmental action and is not and will not engage in any dealings or transactions or be otherwise associated with such persons or entities. ARTICLE VII LEASES; MAINTENANCE AND REPAIRS Section 7.01 Leases. (a) Notwithstanding anything to the contrary in this Agreement, until the Closing or earlier termination of this Agreement, Seller shall not, without Purchaser's prior written consent (which consent shall not be unreasonably withheld, conditioned, or delayed), extend or renew any Lease (except as may be required by law or by the provisions of any Lease) or enter into any new lease encumbering any part of the Property which may become vacant after the date of this Agreement. The surrender or termination of any Lease or the removal of any tenant or occupant (by summary proceedings or otherwise) prior to the Closing Date shall not entitle Purchaser to a reduction in, or credit or allowance against, the Purchase Price or give rise to any other claim on the part of Purchaser or affect the obligations of Purchaser under this Agreement. Prior to the Closing Date, Seller shall have the right, but shall have no obligation, to enforce the rights and remedies of the landlord under any Lease by summary proceedings or otherwise, and if Seller shall have commenced a summary proceeding against a tenant under any Lease or if a tenant shall have abandoned or vacated its premises, Seller may apply all or any portion of any security deposit then held by Seller under any such Lease with respect to such tenant toward any loss or damage incurred by Seller by reason of any default by such tenant. 91 Item 9. 16 (b) If applicable Purchaser shall assume the obligations to pay such commissions when earned and all other obligations of Seller under the Brokerage Agreements accruing after the Closing Date which are in existence on the date of this Agreement and provide for a brokerage commission to be payable on a date after the Closing Date for a new lease, modification, extension, or renewal of an existing Lease effective on the Closing Date; provided, however, that Seller shall pay to Purchaser, or provide a credit thereto, at the Closing for Seller's pro-rata share of such amounts based on Seller's period of ownership during the term for which any such brokerage commissions are payable. Purchaser agrees to hold harmless Seller against all claims, demands, liabilities, and obligations (including, without limitation, reasonable attorneys' fees and disbursements) arising under any such Brokerage Agreements after the Closing Date. Seller agrees to hold harmless Purchaser against all claims, demands, liabilities, and obligations (including, without limitation, reasonable attorneys' fees and disbursements) arising under any Brokerage Agreements payable prior to the Closing Date, and, if applicable, such commissions that are payable after the Closing Date but which are for a period of time prior to the Closing Date and that are to be apportioned pursuant to this Section 7.01(b). (c) Seller shall not enter into any new agreements with any brokers in connection with any prospective tenants for new leases from the date of this Agreement through the Closing Date, or earlier termination of this Agreement, without Purchaser's consent and Purchaser shall assume at the Closing all obligations under such agreements. There shall be no apportionment between Seller and Purchaser of any commission payments arising under such agreements and originating from prospective tenants who after the Closing Date become tenants of the Property. (d) Purchaser shall defend and indemnify Seller against, and hold Seller harmless from, all claims, demands, liabilities, losses, damages, costs, and expenses, including reasonable attorneys' fees, asserted by third parties for any breach, default, or violation of any Lease, or covenant thereof, occurring after the Closing Date. Section 7.02 Maintenance and Repairs. Seller shall cause the Property, and the Improvements, to be maintained in substantially the same manner as prior to the date of this Agreement pursuant to Seller's normal course of business, subject to reasonable wear and ARTICLE VIII of this Agreement. ARTICLE VIII RISK OF LOSS Section 8.01 Risk of Loss. If prior to the Closing Date any portion of the Property shall be taken by condemnation or eminent domain or damaged or destroyed by fire or other casualty, neither party shall have the right to cancel this Agreement. Purchaser shall purchase the Property in accordance with this Agreement, and the Purchase Price shall not be reduced; provided, however, that Seller's rights to any award resulting from such taking or any insurance proceeds resulting from such fire or other casualty (less any reasonable sums expended by Seller for repair or restoration through the Closing Date) shall be assigned by Seller to Purchaser at the Closing. Purchaser and Seller hereby irrevocably waive the provision of any statute that provides for a different outcome or treatment in the event the Property shall be taken or damaged or destroyed by fire of other casualty, including without limitation, the provisions of the Uniform Vendor and Purchaser Risk Act (Tex. Prop. Code Ann. § 5.007). 92 Item 9. 17 ARTICLE IX NOTICES Section 9.01 Delivery of Notices. Unless specifically stated otherwise in this Agreement, all notices, demands, requests, consents, approvals, or other communications (for purposes of this Section 9.01 collectively referred to as "Notices") shall be in writing and delivered to Purchaser, Seller, or Escrow Agent, at the addresses set forth in Section 9.02 below, by one the following methods: (a) Personal delivery, whereby delivery is deemed to have occurred at the time of delivery; (b) Overnight delivery by a nationally recognized overnight courier company, whereby delivery is deemed to have occurred the business day following deposit with the courier; (c) Registered or certified mail, postage prepaid, return receipt requested, whereby delivery is deemed to have occurred on the third business day following deposit with the United States Postal Service; or (d) Electronic transmission (facsimile or electronic mail) provided that such transmission is completed no later than 5:00 p.m. Central Time on a business day and the original is also sent by personal delivery, overnight delivery, or by mail in the manner previously described, whereby delivery is deemed to have occurred at the end of the business day on which the electronic transmission is complete. Section 9.02 Parties' Addresses. (a) Unless changed in accordance with Section 9.02(b) of this Agreement, the addresses for all communications and notices shall be as follows: If to Seller: Name: Sanger Texas Industrial Development Corporation Address: 201 Bolivar Street, Sanger, Texas 76266 Attention: Chairman 4a Board If to Purchaser: Name: City of Sanger Address: 502 Elm Street, P.O. Box 1729, Sanger, Texas 76266 Attention: City Manager With a copy to: Name: City of Sanger Address: 502 Elm Street, P.O. Box 1729, Sanger, Texas 76266 Attention: City Attorney 93 Item 9. 18 If to Escrow Agent: Name: Doma Title Address: 525 S. Locust St, Suite 400, Denton, Texas 76266 Attention: Michelle Neely Email: michelle.neely.v@doma.com (b) Any party may, by notice given in accordance with this Article, designate a different address or person for receipt of all communications or notices. (c) Any notice under this Agreement may be given by the agents of the respective parties who are hereby authorized to do so on their behalf. ARTICLE X REMEDIES Section 10.01 Remedies. (a) If Purchaser shall default in the observance or performance of Purchaser's obligations under this Agreement and the Closing does not occur as a result thereof (a "Purchaser Default"), Seller's sole and exclusive remedy shall be to retain the Deposit plus any accrued interest thereon, if any, as and for full and complete liquidated and agreed damages for Purchaser's Default, and the parties shall be released from further liability to each other hereunder, except for those obligations and liabilities that are expressly stated to survive termination of this Agreement. SELLER AND PURCHASER AGREE THAT IT WOULD BE IMPRACTICAL AND EXTREMELY DIFFICULT TO ESTIMATE THE DAMAGES WHICH SELLER MAY SUFFER UPON A PURCHASER DEFAULT AND THAT THE DOWN PAYMENT AND ANY INTEREST EARNED THEREON, AS THE CASE MAY BE, REPRESENTS A REASONABLE ESTIMATE OF THE TOTAL NET DETRIMENT THAT SELLER WOULD SUFFER UPON A PURCHASER DEFAULT. SUCH LIQUIDATED AND AGREED DAMAGES ARE NOT INTENDED AS A FORFEITURE OR A PENALTY WITHIN THE MEANING OF APPLICABLE LAW. (b) If Seller shall default in the observance or performance of any of the terms of this Agreement, and Purchaser is ready, willing, and able to close in accordance with the terms, provisions, and conditions of this Agreement and the Closing does not occur as a result thereof, Purchaser's sole and exclusive remedy shall be to receive the Deposit and any accrued interest thereon minus the independent consideration, if any. Notwithstanding anything to the contrary contained in this Agreement, in no event shall Seller be liable to Purchaser for any damages of any kind whatsoever. Purchaser waives all rights to specific performance or injunctive relief or other relief to cause Seller to perform its obligations under this Agreement. (c) Upon the release of the Deposit, and any interest accrued thereon, to either Purchaser or Seller, as the case may be, this Agreement shall be deemed null and void and no party hereto shall have any obligations to, or rights against, the other hereunder, except as expressly provided herein. 94 Item 9. 19 (d) The provisions of this Article shall survive the Closing or termination of this Agreement. ARTICLE XI ESCROW Section 11.01 Escrow Terms. Escrow Agent shall hold and disburse the Deposit in accordance with the following provisions: (a) Escrow Agent shall have the right, but not the obligation, to invest the Deposit in savings accounts, treasury bills, certificates of deposit, and/or in other money market instruments approved by Seller, or in funds investing in any of the foregoing, and shall not be liable for any losses suffered in connection with any such investment. (b) If the Closing occurs, then Escrow Agent shall deliver the Deposit to Seller. (c) If for any reason the Closing does not occur and either party makes a written demand upon Escrow Agent for payment of the Deposit, Escrow Agent shall give written notice to the other party of such demand. If Escrow Agent does not receive a written objection from the other party to the proposed payment within fifteen (15) days after the giving of such notice, Escrow Agent is hereby authorized to make such payment. If Escrow Agent does receive such written objection within such fifteen (15) day period or if for any other reason Escrow Agent in good faith shall elect not to make such payment, Escrow Agent shall continue to hold such amount until otherwise directed by written instructions from the parties to this Agreement or a final judgment in court. However, Escrow Agent shall have the right at any time to deposit the escrowed proceeds and interest thereon, if any, with the clerk of a court having competent jurisdiction in the county in which the Property is located. Escrow Agent shall give written notice of such deposit to Seller and Purchaser. Upon such deposit, Escrow Agent shall be relieved and discharged of all further obligations and responsibilities hereunder. Section 11.02 Escrow Agent's Duties and Responsibilities. (a) Escrow Agent has signed this Agreement for the sole purpose of agreeing to act as Escrow Agent in accordance with this Article. Escrow Agent shall have no duties or responsibilities except those set forth in this Agreement and Seller and Purchaser agree and acknowledge that Escrow Agent shall act hereunder as a depository only. (b) Escrow Agent shall be protected in relying upon the accuracy, acting in reliance upon the contents, and assuming the genuineness of any notice, demand, certificate, signature, instrument, or other document that is given to Escrow Agent without verifying the truth or accuracy of any such notice, demand, certificate, signature, instrument, or other document. (c) The parties acknowledge that Escrow Agent is acting solely as a stakeholder at their request and for their convenience, that the duties of Escrow Agent hereunder are purely ministerial in nature and shall be expressly limited to the safekeeping and disposition of the Deposit in accordance with the provisions of this Agreement. Escrow Agent shall not be liable for any action taken or omitted by Escrow Agent in good faith and believed by Escrow Agent to 95 Item 9. 20 be authorized or within its rights or powers conferred upon it by this Agreement, except for any damage caused by Escrow Agent's own gross negligence or willful default or misconduct. Escrow Agent shall not have any liability or obligation for loss of all or any portion of the Deposit by reason of the insolvency or failure of the institution or depository with whom the escrow account is maintained. Upon the disbursement of the Deposit in accordance with this Agreement, Escrow Agent shall be relieved and released from any liability under this Agreement, except in connection with Escrow Agent's gross negligence or willful default or misconduct. (d) In the event that a dispute shall arise in connection with this Agreement, or as to the rights of the parties in and to, or the disposition of, the Deposit, Escrow Agent shall have the right to: (i) hold and retain all or any part of the Deposit until such dispute is settled or finally determined by litigation, arbitration, or otherwise; (ii) deposit the Deposit in an appropriate court of law, following which Escrow Agent shall thereby and thereafter be relieved and released from any liability or obligation under this Agreement; (iii) institute an action in interpleader or other similar action permitted by stakeholders in Texas; or (iv) interplead any of the parties in any action or proceeding which may be brought to determine the rights of the parties to all or any part of the Deposit. (e) Escrow Agent shall not charge a fee for its services as the escrow agent in the transaction contemplated by this Agreement. (f) All costs and expenses incurred by Escrow Agent in performing its duties as Escrow Agent including, without limitation, reasonable attorneys' fees (whether paid to retained attorneys or amounts representing the fair value of legal services rendered to or for itself) shall be borne 50% by Seller and 50% by Purchaser, except however, if any litigation arises under this Agreement with respect to the Deposit, all costs and expenses of the litigation shall be borne by whichever of Seller or Purchaser is the losing party. (g) Escrow Agent has acknowledged agreement to these provisions by signing in the place indicated on the signature page of this Agreement. Section 11.03 Indemnification of Escrow Agent. Seller and Purchaser hereby agree to, jointly and severally, indemnify, defend, and hold harmless Escrow Agent from and against any liabilities, damages, losses, costs, or expenses incurred by, or claims or charges made against Escrow Agent (including reasonable attorneys' fees and disbursements) by reason of Escrow Agent acting or failing to act in connection with any of the matters contemplated by this Agreement or in carrying out the terms of this Agreement, except for those matters arising as a result of Escrow Agent's gross negligence or willful misconduct. Section 11.04 Survival. This Article shall survive the Closing or the termination of this Agreement. 96 Item 9. 21 ARTICLE XII CONFIDENTIALITY Section 12.01 Confidential Information. Purchaser covenants and agrees not to communicate: (a) the terms or any aspect of this Agreement and the transactions contemplated hereby; and (b) the content of any and all information in respect of the Property which is supplied by Seller to Purchaser (collectively, the "Confidential Information") to any person or entity, without the express written consent of Seller; provided, however, that Purchaser may, without consent, disclose the Confidential Information: (i) to its respective advisors, consultants, attorneys, accountants, partners, investors, and lenders (the "Transaction Parties") without the express written consent of Seller, so long as any such Transaction Parties to whom disclosure is made shall also agree to keep all such information confidential in accordance with the terms hereof; and (ii) if disclosure is required by law or by regulatory or judicial process or pursuant to any regulations promulgated by the New York Stock Exchange or other public exchange for the sale and purchase of securities, provided that in such event Purchaser shall notify the Seller in writing of such required disclosure, shall exercise all commercially reasonable efforts to preserve the confidentiality of the Confidential Information, including, without limitation, reasonably cooperating with the other party to obtain an appropriate order or other reliable assurance that confidential treatment will be accorded such Confidential Information by such tribunal and shall disclose only that portion of the Confidential Information which it is legally required to disclose. The foregoing confidentiality obligations shall not apply to the extent that any such Confidential Information is a matter of public record or is provided in other sources readily available to the real estate industry other than as a result of disclosure by Purchaser or its Transaction Parties. Purchaser hereby indemnifies Seller against, and holds Seller harmless from, any and all claims, losses, damages, liabilities, and expenses (including, without limitation, reasonable attorneys' fees and disbursements) arising in connection with Purchaser's obligations under this Section 12.01 and/or the disclosure of any Confidential Information by Purchaser and/or by Purchaser's Transaction Parties in violation of this Section 12.01. The provisions of this Section 12.01 shall survive the Closing or the earlier termination of this Agreement. Section 12.02 Return or Destruction of Confidential Information. As of the Closing Date or in the event of a termination of this Agreement, if applicable, such confidentiality shall be maintained by Purchaser and all Confidential Information in accordance with the written request of Seller shall be either promptly: (a) returned to Seller; or (b) destroyed by Purchaser, with any such destruction confirmed by Purchaser and its Transaction Parties in writing. Section 12.03 Survival. The provisions of this Article shall survive the Closing Date or termination of this Agreement. ARTICLE XIII BROKERS Section 13.01 Brokers. Purchaser and Seller each represent and warrant to each other that they dealt with no broker in connection with, nor has any broker had any part in bringing about, this transaction. Section 13.02 Survival. The provisions of this ARTICLE XIII shall survive the Closing, or the termination of this Agreement prior to the Closing. 97 Item 9. 22 ARTICLE XIV MISCELLANEOUS Section 14.01 Governing Law. This Agreement shall be governed by, interpreted under, and construed and enforced in accordance with the laws of the State of Texas. Section 14.02 Merger; No Representations. This Agreement constitutes the sole and entire agreement of the parties to this Agreement with respect to the subject matter contained herein and supersedes all prior and contemporaneous understandings and agreements, both written and oral, with respect to such subject matter. This Agreement is entered into after full investigation, with no party relying upon any statement or representation, not set forth in this Agreement, made by any other party. Section 14.03 No Survival. Except as otherwise provided in this Agreement, no representations, warranties, covenants, or other obligations of Seller set forth in this Agreement shall survive the Closing and no action based thereon shall be commenced after the Closing. Section 14.04 Limitation of Liability. (a) No member of Seller, nor any Seller Related Party, shall have any personal liability, directly or indirectly, under or in connection with this Agreement or any agreement made or entered into under or pursuant to the provisions of this Agreement or any amendment or amendments to any of the foregoing made at any time or times, heretofore and hereafter, and Purchaser and its successors and assigns and, without limitation all other persons and entities, shall look solely to Seller's assets for the payment of any claim or for any performance and Purchaser, on behalf of itself and its successors and assigns, hereby waives any and all such personal liability. (b) No member or agent of Purchaser, nor any Purchaser Related Party shall have any personal liability, directly or indirectly, under or in connection with this Agreement or any agreement made or entered into under or pursuant to the provisions of this Agreement, or any amendment or amendments to any of the foregoing made at any time or times, heretofore or hereafter, and Seller and its successors and assigns and, without limitations, all other persons and entities, shall look solely to Purchaser's assets for the payment of any claim or for any performance, and Seller, on behalf of itself and its successors and assigns, hereby waives any and all such personal liability. Section 14.05 Business Days. Whenever any action must be taken (including the giving of notices) under this Agreement during a certain time period (or by a particular date) that ends or occurs on a non-business day, then such period (or date) shall be extended until the next succeeding business day. As used herein, the term "business day" shall be deemed to mean any day other than a Saturday, a Sunday, or a legal holiday on which national banks are not open for business in the State of Texas. Section 14.06 Modifications and Amendments. This Agreement cannot under any circumstance be modified or amended orally and no agreement shall be effective to waive, change, modify, terminate, or discharge this Agreement, in whole or in part, unless such agreement is in writing and is signed by both Seller and Purchaser. 98 Item 9. 23 Section 14.07 No Recording. Neither this Agreement, nor any memorandum of this Agreement, shall be recorded. The recording of this Agreement, or any memorandum of this Agreement, by Purchaser shall constitute a material default and shall entitle Seller to retain the Deposit and any interest earned thereon. Section 14.08 Successors and Assigns; Assignment. This Agreement shall be binding upon and shall inure to the benefit of the parties hereto and their respective heirs or successors and permitted assigns. Purchaser may not assign or otherwise transfer this Agreement, or any of its rights or obligations hereunder, without the prior written consent of Seller, which consent may be withheld in Seller's sole discretion. Any purported assignment without Seller's consent shall be void and of no force or effect. Any change in control of Purchaser or of any of the direct or indirect ownership interests in Purchaser, at any level or tier of ownership, whether in one transaction or a series of transactions, shall constitute an assignment for purposes of this Section 14.08. Section 14.09 Severability. If any term or provision of this Agreement is invalid, illegal, or unenforceable in any jurisdiction, such invalidity, illegality, or unenforceability shall not affect, invalidate, or render unenforceable any other term or provision of this Agreement. Upon such determination that any term or other provision is invalid, illegal, or unenforceable, the parties hereto shall negotiate in good faith to modify this Agreement so as to affect the original intent of the parties as closely as possible in a mutually acceptable manner in order that the transactions contemplated by this Agreement be consummated as originally contemplated to the greatest extent possible. Section 14.10 Further Assurances. Each of the parties hereto shall execute and deliver such additional documents, instruments, conveyances, and assurances and take such further actions as may be reasonably required to carry out the provisions of this Agreement and give effect to the transactions contemplated hereby, provided such documents are customarily delivered in real estate transactions in Texas and do not impose any material obligations upon any party hereunder except as set forth in this Agreement. Section 14.11 Counterparts. This Agreement may be executed by the parties in separate counterparts, each of which when so executed and delivered shall be an original for all purposes, but all such counterparts shall together constitute but one and the same instrument. Section 14.12 Time Is of the Essence. The parties hereto acknowledge and agree that, except as otherwise expressly provided in this Agreement, TIME IS OF THE ESSENCE for the performance of all actions (including, without limitation, the giving of Notice, the delivery of documents, and the funding of money) required or permitted to be taken under this Agreement. Whenever action must be taken (including, without limitation, the giving of Notice, the delivery of documents, or the funding of money) under this Agreement, prior to the expiration of, by no later than, or on a particular date, unless otherwise expressly provided in this Agreement, such action must be completed by 12:00 pm Central Time on such date, provided that such action must be completed by 12:00 pm CentralTime with respect to the payment of the balance of the Purchase Price and other payments by Purchaser on the Closing Date. However, notwithstanding anything to the contrary herein, whenever action must be taken (including, without limitation, the giving of Notice, the delivery of documents, or the funding of money) under this Agreement prior to the expiration of, by no later than, or on a particular date that is not a business day, then such date shall be extended until the immediately following business day. 99 Item 9. 24 Section 14.13 Headings. The captions or paragraph titles contained in this Agreement are for convenience and reference only and shall not be deemed a part of the text of this Agreement. Section 14.14 No Waivers. No waiver by any party of any of the provisions hereof shall be effective unless explicitly set forth in writing and signed by the party providing the waiver. No waiver by either party of any failure or refusal to comply with any obligations under this Agreement shall be deemed a waiver of any other or subsequent failure or refusal to so comply. Section 14.15 No Offer. This Agreement shall not be deemed an offer or binding upon Seller or Purchaser until this Agreement is fully executed and delivered by Seller and Purchaser. Section 14.16 Waiver of Jury Trial. SELLER AND PURCHASER HEREBY WAIVE TRIAL BY JURY IN ANY ACTION, PROCEEDING, OR COUNTERCLAIM (WHETHER ARISING IN TORT OR CONTRACT) BROUGHT BY SUCH PARTY AGAINST THE OTHER ON ANY MATTER ARISING OUT OF OR IN ANY WAY CONNECTED WITH THIS AGREEMENT. Section 14.17 Statutory Disclosure Provisions. The following disclosure is made for the purpose of complying with specific statutory provisions of Texas law, and such disclosure is not intended to and does not alter or affect the rights and obligations of Purchaser and Seller: (b) Notice to Purchaser Regarding Restrictive Covenants. Pursuant to the Texas Local Government Code, if the governing body of a municipality has required any person who sells or conveys restricted property located within its jurisdiction to first give written notice to the purchaser of: (i) the restrictions; and (ii) the municipality's right to enforce compliance with the restrictions, written notice must be given to the purchaser on or before the final closing, and the notice document must be signed and acknowledged by both the seller and the purchaser, then recorded in the real property records in the county where the real property is located. The requirements and text of the notice may be found at 30 Tex. Loc. Gov't Code Ann. § 212.155. [SIGNATURE PAGE FOLLOWS] 100 Item 9. 25 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed as of the date first written above by their respective officers thereunto duly authorized. PURCHASER: City of Sanger, a Texas Home Rule Municipal Corporation By: Name: Title: SELLER: Sanger Texas Industrial Development Corporation, a Texas non-profit corporation By: Name: Title: ESCROW AGENT: {ESCROW AGENT NAME} By: Name: Title: 101 Item 9. 26 EXHIBIT A LEGAL DESCRIPTION Lot 2R and 3R, Block A, SANGER INDUSTRIAL ADDITION, LOTS 1R, 2R & 3R, a subdivision in Denton County, Texas 102 Item 9. 27 EXHIBIT B LEASES AND RENT ROLLS None 103 Item 9. 28 EXHIBIT C EXCLUDED PERSONAL PROPERTY None 104 Item 9. 29 EXHIBIT D PERMITTED EXCEPTIONS {PERMITTED EXCEPTION} 105 Item 9. THE FOLLOWING COMMITMENT FOR TITLE INSURANCE IS NOT VALID UNLESS YOUR NAME AND THE POLICY AMOUNT SHOWN IN SCHEDULE A, AND OUR AUTHORIZED REPRESENTATIVE HAS COUNTERSIGNED BELOW. COMMITMENT FOR TITLE INSURANCE Issued by: 760 N.W. 107 Avenue, Suite 401, Miami, FL 33172 or We, North American Title Insurance Company, a California corporation, will issue our title insurance policy or policies (the Policy) to You (the proposed insured) upon payment of the premium and other charges due, and compliance with the requirements in Schedule B and Schedule C. Our Policy will be the form approved by the Texas Department of Insurance at the date of issuance, and will insure your interest in the land described in Schedule A. The estimated premium for our Policy and applicable endorsements is shown on Schedule D. There may be additional charges such as recording fees, and expedited delivery expenses. This Commitment ends ninety (90) days from the effective date, unless the Policy is issued sooner, or failure to issue the Policy is our fault. Our liability and obligations to you are under the express terms of this Commitment and end when this Commitment expires In witness whereof, North American Title Insurance Company has caused its corporate name and seal to be hereunto affixed by its duly authorized officers, the Commitment to become valid when countersigned by an authorized officer or agent of the Company. Authorized Signatory CONDITIONS AND STIPULATIONS 1. If you have actual knowledge of any matter which may affect the title or mortgage covered by this Commitment that is not shown in Schedule B you must notify us in writing. If you do not notify us in writing, our liability to you is ended or reduced to the extent that your failure to notify us affects our liability. If you do notify us, or we learn of such matter, we may amend Schedule B, but we will not be relieved of liability already incurred. 2. Our liability is only to you, and others who are included in the definition of Insured in th e Policy to be issued. Our liability is only for actual loss incurred in your reliance on this Commitment to comply with its requirements or to acquire the interest in the land. Our liability is limited to the amount shown in Schedule A of this commitment and will be subject to the following terms of the Policy: Insuring Provisions, Conditions and Stipulations, and Exclusions. (THIS COMMITMENT IS INVALID UNLESS SCHEDULES A, B, C AND D ARE ATTACHED HERETO.) 106 Item 9. Texas Form T-7 Commitment for Title Insurance Form T-7 Commitment (Jacket) Page 2 of 18 TEXAS TITLE INSURANCE INFORMATION Title insurance insures you against loss resulting from certain risks to your title. The Commitment for Title Insurance is the title insurance company's promise to issue the title insurance policy. The commitment is a legal document. You should review it carefully to completely understand it before your closing date. El seguro de titulo le asegura en relacion a perdidas resultantes de ciertos riesgos que pueden afectar el titulo de su propi edad. El compromiso para Seguro de Titulo es la promesa de la compania ase guradora de titulos de emitir la poliza de seguro de titulo. El Compromiso es un documento legal. Usted debe leerlo cuidadosamente y entenderlo completamente antes de la fecha para finalizar su transaccion. Your commitment for Title Insurance is a legal contract between you and us. The Commitment is not an opinion or report of your title. It is a contract to issue you a policy subject to the Commitment's terms and requirements. Before issuing a Commitment for Title Insurance (the Commitment) or a Title Insurance Policy (the Policy), the Title Insurance Company (the Company) determines whether the title is insurable. This determination has already been made. Part of that determination involves the Company's decision to insure the title except for certain risks that will not be covered by the Policy. Some of these risks are listed in Schedule B of the attached Commitment as Exceptions. Other risks are stated in the policy as Ex clusions. These risks will not be covered by the Policy. The Policy is not an abstract of title nor does a Company have an obligation to determine the ownership of any mineral interest. MINERALS AND MINERAL RIGHTS may not be covered by the Policy. The Company may be unwilling to insure title unless there is exclusion or an exception as to the Mineral and Mineral Rights in the Policy. Optional endorsements insuring certain risks involving minerals, and the use of improvements (excluding lawns, shrubbery and trees) and permanent buildings may be available for pur chase. If the title insurer issues the title policy with an exclusion or exception to the minerals and mineral rights, neither this policy nor th e optional endorsements, ensure that he purchaser has title to the mineral rights related to the surface estate. Another part of the determination involves whether the promise to insure is conditioned upon certain requirements being met. Schedule C of the Commitment lists these requirements that must be satisfied or the Company will refuse to cover them. You ma y want to discuss any matters shown in Schedules B and C of the Commitment with an attorney. These matters will affect your title and your use of the land. When your Policy is issued, the coverage will be limited by the Policy's Exceptions, Exclusions and Conditions, defined be low. • EXCEPTIONS are title risks that a Policy generally covers but does not cover in a particular instance. Exceptions are shown on Schedule B or discussed in Schedule C of the Commitment. They can also be added if you do not comply with the Illnesses section of the Commitment. When the Policy is issued, all Exceptions will be on Schedule B of the Policy. • EXCLUSIONS are title risks that a Policy generally does not cover. Exclusions are contained in the Policy but not shown or discussed in the Commitment. • CONDITIONS are additional provisions that qualify or limit your coverage. Conditions include your responsibilities and those of the Company. They are contained in the Policy but not shown or discussed in the Commitment. The Policy Conditions are not the same as the Commitment Conditions. You can get a copy of the policy form approved by the State Board of Insurance by calling the North American Title Insurance Company at 1-800-374-8475 (Eastern States) or 1- (800) 869-3434 (Western States) or by calling the title insurance agent that issued the Commitment. The Texas Department of Insurance may revise the policy form from time to time. You can also get a brochure that explains the policy from the Texas Department of Insurance by calling 1 -800-252-3439. Before the policy is issued, you may request changes in the Policy. Some of the changes to consider are: Request amendment of the "area and boundary" exception (Schedule B, paragraph 2). To get this amendment, you must furnish a survey and comply with other requirements of the Company. On the Owner’s Policy, you must pay an additional premium for the amendment. If the survey is acceptable to the Company, and if the Company’s other requirements are met, your Policy will ins ure you against loss because of discrepancies or conflicts in boundary lines, encroachments or protrusions, or overlapping of improvements. The Company may then decide not to insure against specific boundary or survey problems by making special exceptions in the Policy. Whether o r not you request amendment of the "area and boundary" exception, you should determine whether you want to purchase and review a survey is a survey is not being provided to you. 107 Item 9. Texas Form T-7 Commitment for Title Insurance Form T-7 Commitment (Jacket) Page 3 of 18 Allow the Company to add an exception to "rights of parties in possession". I f you refuse this exception, the Company or the Title insurance agent may inspect the property. The Company may except to and not insure you against the rights of specific persons , such as renters, adverse owners or easement holders who occupy the land. Th e Company may charge you for the inspection. If you want to make your own inspection, you must sign a Waiver of Inspection form and allow the Company to add this exception to your Polic y. The entire premium for a Policy must be paid when the Policy is issued. You will not owe any additional premiums unless you want to increase your coverage at a later date and the Company agrees to add an Increased Value Endorsement. IMPORTANT NOTICE FOR INFORMATION, OR TO MAKE A COMPLAINT CALL OUR TOLL-FREE TELEPHONE NUMBER 1-800-374-8475 (TEXAS and Eastern States) 1-800-369-3434 (Western States) ALSO YOU MAY CONTACT THE TEXAS DEPARTMENT OF INSURANCE AT 1-800-252-3439 to obtain information on: 1. filing a complaint against an insurance company or agent, 2. whether an insurance company or agent is licensed, 3. complaints received against an insurance company or agent. 4. policyholder rights, and 5. a list of consumer publications and services available through the Department. YOU MAY ALSO WRITE TO THE TEXAS DEPARTMENT OF INSURANCE P.O. BOX 149104 AUSTIN, TEXAS 78714-9104 FAX NO. (512) 490-1007 Web: http://www.tdi.texas.gov E-Mail: ConsumerProtection@tdi.texas.gov AVIVSO IMPORTANTE PARA INFORMACION, O PARA SOMETER UNA QUEJA LLAME AL NUMERO GRATIS 1-800-374-8475 (TEXAS and Eastern States) 1-800-869-3434 (Western States) TAMBIEN PUEDE COMUNICARSE CON EL DEPARTMENTO DE SEGUROS DE TEXAS AL 1-800-252-3439 para obtener informacion sobre: 1. como someter una queja en contra de una compania de seguros o agente de seguros, 2. si una compania de seguros o agente de seguros tiene licencia, 3. quejas recibidas en contra de una compania de seguros o agente de seguros, 4. los derechos del asegurado, y 5. una lista de publicaciones y servicios para consumidores disponibles a traves del Departmento. TAMBIEN PUEDE ESCRIBIR AL DEPARTMENTO DE SEGUROS DE TEXAS P.O. BOX 149104 AUSTIN, TEXAS 78714-9104 FAX NO. (512) 490-1007 Web: http://www.tdi.texas.gov E-Mail: ConsumerProtection@tdi.texas.gov 760 N.W. 107 Avenue, Suite 401, Miami, FL 33172 108 Item 9. North American Title Insurance Company COMMITMENT FOR TITLE INSURANCE SCHEDULE A FORM T-7: Commitment for Title Insurance Schedule A 14800-23-00197 Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent Effective Date: January 2, 2023 at 12:00 AM GF No.: 14800-23-00197 Commitment No. 14800-23-00197, issued January 13, 2023, 12:00 AM 1. The policy or policies to be issued are: a. OWNER'S POLICY OF TITLE INSURANCE (Form T-1) (Not applicable for improved one-to-four family residential real estate) Policy Amount: PROPOSED INSURED: b. TEXAS RESIDENTIAL OWNER'S POLICY OF TITLE INSURANCE ONE-TO-FOUR FAMILY RESIDENCES (Form T-1R) Policy Amount: $1,500,000.00 PROPOSED INSURED: Sanger Economic Development Corporation c. LOAN POLICY OF TITLE INSURANCE (Form T-2) Policy Amount: PROPOSED INSURED: Proposed Borrower: d. TEXAS SHORT FORM RESIDENTIAL LOAN POLICY OF TITLE INSURANCE (Form T-2R) Policy Amount: PROPOSED INSURED: Proposed Borrower: e. LOAN TITLE POLICY BINDER ON INTERIM CONSTRUCTION LOAN (Form T-13) Binder Amount: PROPOSED INSURED: Proposed Borrower: f. OTHER Policy Amount: PROPOSED INSURED: 2. The interest in the land covered by this Commitment is: Fee Simple 3. Record title to the land on the Effective Date appears to be vested in: Sanger Texas Industrial Development Corporation, a Texas non-profit corporation 109 Item 9. SCHEDULE A (Continued) FORM T-7: Commitment for Title Insurance Schedule A 14800-23-00197 Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent 4. Legal description of land: Lot 2R and 3R, Block A, SANGER INDUSTRIAL ADDITION, LOTS 1R, 2R & 3R, a subdivision in Denton County, Texas according to the map or plat of record in Document No. 2019-33, Plat Records, Denton County, Texas. 110 Item 9. SCHEDULE B Commitment No.: 14800-23-00197 GF No.: 14800-23-00197 EXCEPTIONS FROM COVERAGE FORM T-7: Commitment for Title Insurance Schedule B 14800-23-00197 Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent In addition to the Exclusions and Conditions and Stipulations, your Policy will not cover loss, costs, attorn ey's fees, and expenses resulting from: 1. The following restrictive covenants of record itemized below: Document No. 2019-33, Plat Records, Denton County, Texas. Note: To the extent that these restrictions violate 42 USC 3604(c) by indicating a pref erence, limitation or discrimination based on race, color, religion, sex, handicap, familial status or national origin, such restrictions are hereby omitted. 2. Any discrepancies, conflicts, or shortages in area or boundary lines, or any encroachments o r protrusions, or any overlapping of improvements. 3. Homestead or community property or survivorship rights, if any of any spouse of any insured. (Applies to the Owner's Policy only.) 4. Any titles or rights asserted by anyone, including, but not limited to, persons, the public, corporations, governments or other entities, a. to tidelands, or lands comprising the shores or beds of navigable or perennial rivers and streams, lakes, bays, gulfs or oceans, or b. to lands beyond the line of the harbor or bulkhead lines as established or changed by any government, or c. to filled-in lands, or artificial islands, or d. to statutory water rights, including riparian rights, or e. to the area extending from the line of mean low tide to the line of vegetation, or the rights of access to that area or easement along and across that area. (Applies to the Owner's Policy only.) 5. Standby fees, taxes and assessments by any taxing authority for the year 2023, and subsequent years; and subsequent taxes and assessments by any taxing authority for prior years due to change in land usage or ownership, but not those taxes or assessments for prior years because of an exemption granted to a previous owner of the property under Section 11.13, Texas Tax C ode, or because of improvements not assessed for a previous tax year. (If Texas Short form Residential Loan Policy (T -2R) is issued, that policy will substitute "which become due and payable subsequent to Date of Policy" in lieu of "for the year 2023, and subsequent years.") 6. The terms and conditions of the documents creating your interest in the land. 111 Item 9. SCHEDULE B (Continued) FORM T-7: Commitment for Title Insurance Schedule B 14800-23-00197 Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent 7. Materials furnished or labor performed in connection with planned construction before signing and delivering the lien document described in Schedule A, if the land is part of the homestead of the owner. (Applies to the Loan Title Policy Binder on Interim Construction Loan only, and may be deleted if satisfactory evidence is furnished to us before a binder is issued.) 8. Liens and leases that affect the title to the land, but that are subordinate to the lien of the insured mortgage. (Applies to Loan Policy (T-2) only.) 9. The Exceptions from Coverage and Express Insurance in Schedule B of the Texas Short Form Residential Loan Policy of Title Insurance (T-2R). (Applies to Texas Short Form Residential Loan Policy of Title Insurance (T-2R) only.) Separate exceptions 1 through 8 of this Schedule B do not apply to the Texas Short Form Residential Loan Policy of Title Insurance (T -2R). 10. The following matters and all terms of the documents creating or offering evidence of the matters: a. Visible and apparent easements on or across the property covered by this policy which may not appear of record. (This item will not appear on Schedule "B" of the p olicy if a survey is provided by an approved surveyor showing no such easements.) b. Rights of parties in possession. (Affects Owner Policy Only). c. All leases, grants, exceptions or reservations of coal, lignite, oil, gas and other minerals, together with all rights, privileges and immunities relating thereto, appearing in the Public Records whether listed in Schedule B or not. There may be leases, grants, exceptions or reservations of mineral interest that are not listed. d. Any portion of the subject property lying within the boundaries of a public or private roadway whether dedicated or not, or which may be used for road or street purposes. e. Any encroachment, encumbrance, violation, variation, or adverse circumstance affecting the title that would be disclosed by an accurate and complete land survey of the land. (Note: Upon receipt of a survey acceptable to Company, this exception will be deleted. Company reserves the right to add additional exceptions per its examination of said survey. f. A 15 foot sanitary sewer easement across the west side of Lot 3R, as shown on the recorded plat. g. A 15 foot water easement across the west side of Lot 3R, as shown on the recorded plat. h. Communications Easement and Right-of-Way reserved in instrument recorded in Volume 801, Page 222, Deed Records of Denton County, Texas. i. Sewer Easement and Right-of-Way reserved in instrument recorded in Volume 833, Page 619, Deed Records of Denton County, Texas. j. Utility Easement and Right-of-Way reserved in instrument recorded in Volume 1055, Page 125, Deed Records of Denton County, Texas. 112 Item 9. SCHEDULE B (Continued) FORM T-7: Commitment for Title Insurance Schedule B 14800-23-00197 Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent k. Electric Transmission and/or Distribution Line Easement and Right-of-Way granted to Brazos Electric Power Cooperative, Inc. recorded in Volume 818, Page 637, Deed records, Denton County, Texas. l. Mineral and/or royalty interest in all of the oil, gas, and other minerals and/or other substances in and under the subject property, including royalties, bonuses, rentals, ingress/egress and all other rights as set out in Volume 801, Page 222, Deed Records, Denton County, Texas, together with all rights, express or implied, in and to the subject property, arising out of or connected with said interest, reference to which instrument is here made for all purposes. Title to said interest has not been investigated subsequent to the date of the aforesaid instrument. The Company makes no representation to the present ownership of this interest. m. Terms and provisions of Landlords Waiver and Lease Agreement, recorded in Volume 5085, Page 2792, Official Public Records, Denton County, Texas. 113 Item 9. SCHEDULE C Commitment No.: 14800-23-00197 GF No.: 14800-23-00197 FORM T-7: Commitment for Title Insurance Schedule C 14800-23-00197 Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent Your Policy will not cover loss, costs, attorney's fees, and expenses resulting from the following requirements that will appear as Exceptions in Schedule B of the Policy, unless y ou dispose of these matters to our satisfaction, before the date the Policy is issued: 1. 1 . Documents creating your title or interest must be approved by us and must be signed, notarized and filed for record. 2. 2 . Satisfactory evidence must be provided that: a. no person occupying the land claims any interest in that land against the persons named in paragraph 3 of Schedule A, b. all standby fees, taxes, assessments and charges against the property have been paid, c. all improvements or repairs to the property are completed and accepted by the owner, and that all contractors, sub-contractors, laborers and suppliers have been fully paid, and that no mechanic's, laborer's or materialmen's liens have attached to the property, d. there is legal right of access to and from the land, e. (on a Loan Policy only) restrictions have not been and will not be violated that affect the validity and priority of the insured mortgage. 3. 3 . You must pay the seller or borrower the agreed amount for your property or interest. 4. 4 . Any defect, lien or other matter that may affect title to the land or interest insured, that arises or is filed after the effective date of this Commitment. 5. Procedural Rule P-27 promulgated by the Texas Department of insurance provides a list of the types of financial documents and instruments which satisfy the requirement that we disburse only when we have received good funds as required by said rule and Section 2651.202 Insurance Code. Please be advised that we reserve the right to determine on a case-by-case basis what form of good funds is acceptable. 6. Upon request and receipt of applicable premium, if any, and in accordance with Texas Procedural Rule P - 50.1, T-19.2 and/or T-19.3 Minerals and Surface Damage Endorsements will be issued at the time of closing of this transaction. 7. Must be furnished proof owner is a valid corporation and is in good standing with the State Comptroller's office. Must be furnished proper resolution authorizing this transaction and naming the person(s) authorized to execute documents. 8. We must be furnished with a properly executed Affidavit of Debts and Liens, executed by the record owner and/or seller. We must be furnished with a properly executed Waiver of Inspection executed by the Purchaser(s). This file must be updated prior to closing. 114 Item 9. SCHEDULE C (Continued) FORM T-7: Commitment for Title Insurance Schedule C 14800-23-00197 Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent 9. "Note for information purposes only: No deeds were found of record affecting the subject property in the last 24 months, The last deed of record is recorded under Document No. 2009-70797, Denton County, Texas." DOMA INSURANCE AGENCY OF TEXAS, INC. FEE ATTORNEY OFFICE Authorized Signatory 115 Item 9. SCHEDULE D Commitment No.: 14800-23-00197 GF No.: 14800-23-00197 FORM T-7: Commitment for Title Insurance Schedule D 14800-23-00197 Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent Pursuant to the requirements of Rule P-21, Basic Manual of Rules, Rates and Forms for the writing of Title Insurance in the State of Texas, the following disclosures are made: 1. The issuing Title Insurance Company, North American Title Insurance Company, is a corporation whose shareholders owning or controlling, directly or indirectly, 10% of said corporation, directors and officers are listed below: Shareholders: North American Title Insurance Company which is a wholly owned subsidiary of Doma Holdings, Inc., a Delaware corporation. Directors: Max Simkoff, Emilio Fernandez, Noaman Ahmad, Eric Watson, Mike Smith. Officers: President and Chief Executive Officer: Emilio Fernandez; Executive Vice President and Secretary: Valerie Jahn-Grandin; Chief Financial Officer and Treasurer: Mike Smith; Vice President, Senior Regional Underwriting Counsel: Virginia Abiassi 2. The following disclosures are made by the Title Insura nce Agent issuing this Commitment: a. A listing of each shareholder, owner, partner, or other person having, owning or controlling one percent (1%) or more of the Title Insurance Agent that will receive a portion of the premium: None b. A listing of each shareholder, owner, partner, or other person having, owning or controlling 10 percent (10%) or more of an entity that has, owns or controls one percent (1%) or more of the Title Insurance Agent that will receive a portion of the premium: None c. The names of the officers and directors of the Title Insurance Agent are as follows: President: Max Simkoff; Treasurer: Mike Smith; Secretary: Eric Watson 3. You are entitled to receive advance disclosure of settlement charges in connection with the prop osed transaction to which this commitment relates. Upon your request, such disclosure will be made to you. Additionally, the name of any person, firm or corporation receiving any sum from the settlement of this transaction will be disclosed on the closing or settlement statement. You are further advised that the estimated title premium* is: Owner’s Policy $ 7,740.00 Loan Policy $ 0 Endorsement Charges $ 0.00 Other $ 0.00 Total $ 7,740.00 Of this total amount: 15% will be paid to the policy issuing Title Insurance Company; 85% will be retained by the issuing Title Insurance Agent; and the remainder of the estimated premium will be paid to other parties as follows: Amount To Whom For Services *The estimated premium is based upon informat ion furnished to us as of the date of this Commitment for Title Insurance. Final determination of the amount of the premium will be made at closing in accordance with the Rules and Regulations adopted by the Commissioner of Insurance. 116 Item 9. SCHEDULE D (Continued) FORM T-7: Commitment for Title Insurance Schedule D 14800-23-00197 Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent This commitment is invalid unless the insuring provisions and Schedules A, B, and C are attached. 117 Item 9. FORM T-7: Commitment for Title Insurance Deletion of Arbitration Provision 14800-23-00197 Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent DELETION OF ARBITRATION PROVISION (Not applicable to the Texas Residential Owner's Policy) Commitment No.: 14800-23-00197 GF No.: 14800-23-00197 ARBITRATION is a common form of alternative dispute resolution. It can be a quicker and cheaper means to settle a dispute with your Title Insurance Company. However, if you agree to arbitrate, you give up your right to take the Title Insurance Company to court and your rights to discovery of evidence may be limited in the arbitration process. In addition, you cannot usually appeal an arbitrator's award. Your policy contains an arbitration provision (shown below). It allows you or the Company to require arbitration if the amount of insurance is $2,000,000 or less. If you want to retain your right to sue the Company in case of a dispute over a claim, you must request deletion of the arbitration provision before the policy is issued. You can do this by signing this form and ret urning it to the Company at or before the closing of your real estate transaction or by writing to the Company. The arbitration provision in the Policy is as follows: "Either the Company or the Insured may demand that the claim or controversy shall be su bmitted to arbitration pursuant to the Title Insurance Arbitration Rules of the American Land Title Association (“Rules”). Except as provided in the Rules, there shall be no joinder or consolidation with claims or controversies of other persons. Arbitrab le matters may include, but are not limited to, any controversy or claim between the Company and the Insured arising out of or relating to this policy, any service in connection with its issuance or the breach of a policy provision, or to any other controv ersy or claim arising out of the transaction giving rise to this policy. All arbitrable matters when the Amount of Insurance is $2,000,000 or less shall be arbitrated at the option of either the Company or the Insured, unless the Insured is an individual person (as distinguished from an Entity). All arbitrable matters when the Amount of Insurance is in excess of $2,000,000 shall be arbitrated only when agreed to by both the Company and the Insured. Arbitration pursuant to this policy and under the Rules shall be binding upon the parties. Judgment upon the award rendered by the Arbitrator(s) may be entered in any court of competent jurisdiction." SIGNATURE DATE 118 Item 9. rev. 03/2014 Privacy Policy (NATG) 14800-23-00197 119 Item 9. rev. 03/2014 120 Item 9. rev. 03/2014 121 Item 9. NORTH AMERICAN TITLE INSURANCE COMPANY Commitment Number: 14800-23-00197 LEGAL DESCRIPTION Legal description of the land: Lot 2R and 3R, Block A, SANGER INDUSTRIAL ADDITION, LOTS 1R, 2R & 3R, a subdivision in Denton County, Texas according to the map or plat of record in Document No. 2019-33, Plat Records, Denton County, Texas. 122 Item 9. Lot 2R and 3R, Block A, SANGER INDUSTRIAL ADDITION, LOTS 1R, 2R & 3R, a subdivision in Denton County, Texas, according to the Map or Plat of record in Document No. 2019-33, Plat Records, Denton County, Texas. (Commonly known as 103 BOLIVAR STREET) The plat hereon is a true and accurate representation of the property as determined by survey made on the ground, the lines and dimensions of said property as being indicated on the Plat. The size, location and type of buildings and improvements are as shown, all improvements being within the boundaries of property except as shown, set back from the property lines is as shown, and the nearest street or road is shown. Thereare no visible encroachments, visible protrusions or apparent easements, except as shown on the Plat. I further certify that no portion of subject property lies within a special flood hazard area according to The FLOOD INSURANCE RATE MAP for Denton County and Incorporated Areas, Map Number 48121CO210G, Dated April 18, 2011. (Subject property lies in Zone X) ______________________________________________ Jerald D. Yensan, Professional Land Surveyor Texas R.P.L.S. No. 4561 DOSTER LAW GROUP G.F. 14800-23-00197 TX FIRM REGISTRATION NO. 10098600 DRAWN BY: SCALE:DATE: 4238 I-35 NORTH DENTON, TEXAS 76207 ANDMARK SURVEYORS, LLC.SLB 1"=40'(940) 382-4016 FAX (940) 387-9784 JOB NO: PURCHASER: SANGER ECONOMIC DEVELOPMENT CORP. 24 JANUARY, 2023 236775 Basis of Bearing is the State Plane Coordinate System, Texas North Central Zone (4202), North American Datum of 1983, as determined from GPS observations. 123 Item 9. Atmos Energy Corporation 5420 LBJ Freeway, Suite 1862 Dallas, TX 75240 P 214-206-2568 Christopher.Felan@atmosenergy.com February 24, 2023 TO THE GOVERNING BODY OF THE CITIES IN THE ATMOS TEXAS MUNICIPALITIES COALITION SERVED BY ATMOS ENERGY CORPORATION’S MID-TEX DIVISION Dear City Official, Please find enclosed the 2022 Interim Rate Adjustment Application (“IRA”) for the incorporated areas of the Atmos Texas Municipalities Coalition (“ATM Cities”) served by Atmos Energy Corporation’s Mid-Tex Division, (the “Mid-Tex Division” or the “Company”). This filing includes information labeled as follows: (a) The ATM Cities Interim Rate Adjustment Application (“IRA Application” Section) and the Annual Earnings Monitoring Report (“EMR Report” Section). (b) The Project Report describing the investment projects used by the Company in providing utility service which were both completed and placed in service from January 1, 2022 through December 31, 2022 as well as the investments retired or abandoned from January 1, 2022 through December 31, 2022 (“Project Report” Section). The Project Report also states the cost, need, and customers benefited by the change in investment. A Project Report is also included which states the project by FERC Account and amount. (c) The Relocation Project Report providing certain supplemental information about relocation project costs included in the Project Report for the period of January 1, 2022 through December 31, 2022 (“Relocation Project Report” Section). (d) The affidavits of Christopher A. Felan and Barbara W. Myers. Mr. Felan’s affidavits attest to (i) the method and date on which notice will be given to all customers, and (ii) relocations. Ms. Myers provides an affidavit which verifies that the Mid-Tex Division’s books and records are kept in accordance with the rules of the Railroad Commission of Texas and verifies that the schedules enclosed are Christopher A. Felan Vice President Rates & Regulatory Affairs 124 Item 10. Atmos Energy Corporation 5420 LBJ Freeway, Suite 1862 Dallas, TX 75240 P 214-206-2568 Christopher.Felan@atmosenergy.com summaries of the Mid-Tex Division’s books and records related to the invested capital used by the Company in providing utility service (“Affidavits” Section). The tariffs included in the enclosed package in the section designated “IRA Application” following IRA-3 will be effective on April 25, 2023. These tariffs establish an IRA that will affect the monthly customer charge or meter charge applicable to the ATM Cities. As authorized under Section 104.301 of the Texas Utilities Code, the IRA will recover the difference between the values of invested capital for the Mid-Tex Division’s system as of December 31, 2022, and the value of the invested capital for the Mid-Tex Division’s system as of December 31, 2021. This investment is used to provide gas services and the IRA will remain in effect until the issuance of a final decision in a rate case that is filed after the implementation of these tariffs. All amounts collected under these tariffs are subject to refund. The IRA set forth in the tariffs accompanying this filing was calculated by applying the methodologies approved by the Railroad Commission of Texas in GUD No. 10779 and the factors established in the Final Order Finding of Fact Nos. 45 and 46 and Exhibit B. GUD No. 10779 established the latest effective rates for customers within the ATM Cities. Upon approval, the IRA will be added to the customer/meter charges that are effective for customers within the ATM Cities. Under Section 104.301, as amended, ATM Cities are provided the opportunity to review the filing and either: (i) take final action before April 25, 2023; or (ii) suspend the effective date of these tariffs for forty-five (45) days after April 25, 2023. The source documentation supporting the new investment is available for review through Atmos Energy’s electronic databases. If you wish to schedule an opportunity to review the electronic databases or any hard copy project files related to the new investment, please contact me at 214-206-2568. In addition, the Company has elected to make certain adjustments in this filing. These adjustments are detailed in the Company’s IRA schedules. Elective adjustments have been made to remove certain employee expenses identified via a detailed review of every employee expense report for items recorded to capital projects for the Shared Services Division and the Mid-Tex Division. These expenses have been removed to reduce controversy. The Company reserves its right to seek recovery of these expenses in a rate proceeding involving a review of the Company’s invested capital through at least December 31, 2022. 125 Item 10. Atmos Energy Corporation 5420 LBJ Freeway, Suite 1862 Dallas, TX 75240 P 214-206-2568 Christopher.Felan@atmosenergy.com Notice of this proceeding will be provided to affected customers in the incorporated areas of the ATM Cities by bill insert or individual mailing within 45 days after the date of this filing in accordance with Section 104.301. The tariffs included in the IRA Application Section of this GRIP filing do not require any action on the part of your city to become effective on April 25, 2023. In closing, please accept for filing this cover correspondence, the above mentioned tariffs, filing package and enclosures. Please contact me with any questions you may have regarding this filing. Respectfully Submitted, Chris Felan 126 Item 10. ATMOS ENERGY CORP., MID-TEX DIVISION ATMOS TEXAS MUNICIPALITIES COALITION (“ATM Cities”) INTERIM RATE ADJUSTMENT APPLICATION TABLE OF CONTENTS Interim Rate Adjustment Application – ATM Cities (“IRA Application”) – IRA-1 through IRA-23 Annual Earnings Monitoring Report – ATM Cities (“EMR Report”) – EMR-1 through EMR-5 Project Report: Mid-Tex: Additions Retirements SSU: Additions Retirements Relocation Project Report Affidavits Christopher A. Felan (2) Barbara W. Myers 127 Item 10. This is an original submission. Date of Submission: February 24, 2023 Twelve (12) Month Period Ending December 31, 2022 Interim Rate Adjustment Application of Atmos Energy Corp., Mid-Tex Division to the Atmos Texas Municipalities Coalition ("ATM") for the 128 Item 10. Tab Reference Schedule Description IRA-1 General Information IRA-2 Notice IRA-3 Rate Schedules IRA-4 Bill Comparisons IRA-5 Interim Rate Adjustment Summary IRA-5A Allocation Factors IRA-5B Miscellaneous Adjustments IRA-6 Direct Initial or Prior Year Plant IRA-7 Direct Current Year Plant (Adjusted) IRA-7A Direct Current Year Plant Adjustments IRA-8 Direct Incremental Plant IRA-9 Allocated Initial or Prior Year Plant - SSU IRA-10 Allocated Current Year Plant (Adjusted) - SSU IRA-10A Allocated Current Year Plant Adjustments - SSU IRA-11 Allocated Incremental Plant - SSU Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Table of Contents Table of Contents Page 1 of 2 129 Item 10. Tab Reference Schedule Description Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Table of Contents IRA-12 Direct Additions Project Report IRA-13 Direct Retirements Project Report IRA-14 Allocated Additions Project Report IRA-15 Allocated Retirements Project Report IRA-16 Direct Additions Detail IRA-17 Direct Retirements Detail IRA-18 Allocated Additions Detail IRA-19 Allocated Retirements Detail IRA-20 Federal Income Taxes IRA-21 Ad Valorem and Other Taxes IRA-22 Footnotes Page IRA-23 Signature Page Table of Contents Page 2 of 2 130 Item 10. 1.Provide the exact name of the utility. Atmos Energy Corp., Mid-Tex Division 2. Provide the date when the utility was originally organized. 3. 4. Name:Christopher Felan Title:Vice President, Rates and Regulatory Affairs Address:5420 LBJ Freeway, Suite 1800 Dallas, Texas 75240 Phone:214.206.2568 Email:christopher.felan@atmosenergy.com 5. Name:Shelly Bass Title:Associate General Counsel Address:5430 LBJ Freeway, Suite 1800 Dallas, Texas 75240-2601 Phone:972.855.3756 Email:shelly.bass@atmosenergy.com Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 General Information December 11, 1942 Describe any change in the utility name. Include the effective date of the change and state in which the change took effect. None. Provide the name, title, phone number, email address, and office address for the Company representative to whom correspondence should be addressed concerning this report. Provide the name, title, phone number, email address, and office address of any other individual designated by the utility to answer questions regarding this report (optional). IRA-1 General Info Page 1 of 3 131 Item 10. Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 General Information 6.Provide the address for the office where the Company's records are kept. 7.This rate adjustment will impact the: 8.How many months are included in the filing period? Twelve (12) 9.In what year does the test period end? 2022 10.What is the test period ending date for the prior filing? MM/DD/YYYY (Either a rate case or IRA) Month (MM)12 Day (DD)31 Year (YYYY)2021 11.What is the submission date for this filing? February 24, 2023 12.Is this an original or a revised submission? (Enter either 'an original' or 'a revised' below.) an original 13.In what Gas Utilities Docket were current rates set? Provide the docket number only. 10779 14.Enter the docket number for the most recent rate case in which rates were set in this service area. 2021 MTX ATM Interim Rate Adjustment Filing 5420 LBJ Freeway, Suite 1800, Dallas, Texas 75240 Initial Block Rate Monthly Customer Charge Monthly Capacity Charge IRA-1 General Info Page 2 of 3 132 Item 10. Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 General Information 15.What is the cost of gas and transportation used in calculating average bills for IRA-4? Rate R 1.03379$ per Ccf Rate C 0.92209$ per Ccf Rate I 6.7477$ per MMBtu Rate T 0.4637$ per MMBtu 16.What Federal Income Tax rate was approved in the most recent rate case for this service area? 21% 17.What is the ad valorem tax rate based on the most recent rate case updated for the current period? Direct 2.30%Please see IRA-21 Allocated SSU GO 0.79%Please see IRA-21 Allocated SSU CS 0.47%Please see IRA-21 18. Capital Structure Cost Weighted Cost Common Equity 60.18% 9.80% 5.90% Debt 39.82% 5.20% 2.07% Total 100.00% 7.97% 19. If this is a revised application, identify each schedule number, line number, and column designation where revised input data appears. Complete the following weighted average cost of capital table using factors set in the most recent rate case for this service area: Please see Finding of Facts: 42 through 45 GUD No. 10779 Final Order References: Please see Finding of Facts: 42 through 45 IRA-1 General Info Page 3 of 3 133 Item 10. 1. Attach the Company's proposed Notice. Attached are sample copies of the Notices to be sent to Rate Schedules R, C, I, and T. 2. Please also provide an electronic copy of the proposed Notice in Microsoft Word with the filing. 3. Included in the filing is an Affidavit by Christopher Felan that notice will be provided. 4.Completion of notice is required within 45 days from date of filing: April 10, 2023. Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Notice Attach an affidavit that Notice has been or will be provided by direct mail or bill insert and include the date notice was or will be provided. Please see the enclosed flash drive for an electronic copy of the Notices in MS Word format. IRA-2 Notice Page 1 of 1 134 Item 10. CUSTOMER NOTICE OF INTERIM RATE ADJUSTMENT Pursuant to Texas Utilities Code Section 104.301, the Mid-Tex Division of Atmos Energy Corporation (the “Company”), filed an application for an Interim Rate Adjustment with the Cities in the Atmos Texas Municipalities Coalition (“ATM Cities”) on February 24, 2023. This proposed Interim Rate Adjustment applies to all customers served by the Company within the ATM Cities incorporated areas of the Mid-Tex Division and provides for the recovery of additional capital investment incurred from January 1, 2022 through December 31, 2022. The request is for capital investment not included in any previous rate case or rates for service, does not include the recovery of costs related to the winter event of February 2021, and is subject to refund. The Company proposes to increase the customer/meter charge used to calculate the customer’s monthly bill by the amount listed below. The proposed Interim Rate Adjustment effective date is April 25, 2023. In accordance with Texas Utilities Code Section 104.101, the increase constitutes a major change in the Company’s rates. TABLE 1 Rate Schedule Current Customer Charge Proposed 2022 Interim Rate Adjustment Adjusted Charge Increase Per Bill Rate R – Residential Sales $ 36.14 per customer per month $ 5.09 per customer per month $ 41.23 per customer per month $ 5.09 Rate C – Commercial Sales $ 97.72 per customer per month $ 16.63 per customer per month $ 114.35 per customer per month $ 16.63 Persons with questions or who want more information about this filing may contact the Company at 1-888-286-6700. A copy of the filing will be available for inspection during normal business hours at the Company’s office at 5400 LBJ Freeway, Suite 1800, Dallas, Texas, 75240 or on the Company's website at www.atmosenergy.com/MTXtariffs . Any affected person within an ATM Cities incorporated area may contact his or her city council. Please reference the ATM Cities Interim Rate Adjustment in your written comment or protest. 135 Item 10. AVISO A NUESTROS CLIENTES: AJUSTE INTERINO DE TARIFAS Conforme a la sección 104.301 del Código de Servicios Públicos de Texas, la División Mid-Tex de Atmos Energy Corporation (la “Compañía”) presentó una solicitud para un ajuste interino de tarifas con las Ciudades en la Coalición Atmos de Municipios Tejas (“ATM Cities”) por sus siglas en inglés) el 24 de febrero del 2023. El ajuste interino de tarifas propuesto aplicará a todos los clientes servidos por la Compañía dentro de las áreas incorporadas de las ATM Cities en la División Mid-Tex de Atmos Energy y provee la recuperación del costo de inversión adicional de capital incurrida desde el 1 de enero, 2022 hasta el 31 de diciembre, 2022. Esta solicitud es por inversión de capital no incluida en cualquier ajuste de tarifas por servicio anterior, no incluye recuperación de los costos relacionados con el evento de invierno en febrero, 2021, y está sujeta a reembolso. La Compañía propone aumentar el cargo de cliente/medidor utilizado para calcular la factura mensual del cliente según indicado en la tabla abajo. La fecha efectiva del Ajuste Interino de Tarifas propuesto es el 25 de abril, 2023. El aumento constituye un cambio mayor en las tarifas de la Compañía, tal como es definido en la sección 104.101 del Código de Servicios Públicos de Texas. TABLA 1 Tabla de Tarifas Cargo de Cliente Actual Propuesto Ajuste Interino 2022 Cargo Ajustado Aumento por Factura Tarifa R - Ventas Residenciales $36.14 por cliente por mes $5.09 por cliente por mes $41.23 por cliente por mes $5.09 Tarifa C - Ventas Comerciales $97.72 por cliente por mes $16.63 por cliente por mes $114.35 por cliente por mes $16.63 Aquellas personas con preguntas o que deseen más información sobre esta solicitud pueden ponerse en contacto con la Compañía al 1-888-286-6700. Pueden ver una copia de la solicitud durante las horas normales de negocio en la oficina de la Compañía situada en 5400 LBJ Freeway, Suite 1800, Dallas, Texas 75240 o en la página web de la Compañía en www.atmosenergy.com/MTXtariffs . Cualquier persona afectada dentro de un área incorporada de las “ATM Cities” puede ponerse en contacto con el ayuntamiento de su municipio. Debe incluir el referente “ATM Cities Interim Rate Adjustment” en su comentario o protesta por escrito. 136 Item 10. CUSTOMER NOTICE OF INTERIM RATE ADJUSTMENT Pursuant to Texas Utilities Code Section 104.301, the Mid-Tex Division of Atmos Energy Corporation (the “Company”), filed an application for an Interim Rate Adjustment with the Cities in the Atmos Texas Municipalities Coalition (“ATM Cities”) on February 24, 2023. This proposed Interim Rate Adjustment applies to all customers served by the Company within the ATM Cities incorporated areas of the Mid-Tex Division and provides for the recovery of additional capital investment incurred from January 1, 2022 through December 31, 2022. The request is for capital investment not included in any previous rate case or rates for service, does not include the recovery of costs related to the winter event of February 2021, and is subject to refund. The Company proposes to increase the customer/meter charge used to calculate the customer’s monthly bill by the amount listed below. The proposed Interim Rate Adjustment effective date is April 25, 2023. In accordance with Texas Utilities Code Section 104.101, the increase constitutes a major change in the Company’s rates. TABLE 1 Rate Schedule Current Customer Charge Proposed 2022 Interim Rate Adjustment Adjusted Charge Increase Per Bill Rate I – Industrial Sales $ 1,772.57 per meter per month $ 306.86 per meter per month $ 2,079.43 per meter per month $ 306.86 Rate T – Transportation $ 1,772.57 per meter per month $ 306.86 per meter per month $ 2,079.43 per meter per month $ 306.86 Persons with questions or who want more information about this filing may contact the Company at 1-888-286-6700. A copy of the filing will be available for inspection during normal business hours at the Company’s office at 5400 LBJ Freeway, Suite 1800, Dallas, Texas, 75240 or on the Company's website at www.atmosenergy.com/MTXtariffs . Any affected person within an ATM Cities incorporated area may contact his or her city council. Please reference the ATM Cities Interim Rate Adjustment in your written comment or protest. 137 Item 10. 1. Attach the Company's proposed rate schedules. Please see the following attached Rate Schedules: Rate R - Residential Sales Rate C - Commercial Sales Rate I - Industrial Sales Rate T - Transportation 2. Please see the enclosed flash drive containing following files: Residential (ATM Cities) Tariff - Clean.docx Commercial (ATM Cities) Tariff - Clean.docx Industrial (ATM Cities) Tariff - Clean.docx Transportation (ATM Cities) Tariff - Clean.docx Residential (ATM Cities) Tariff - Redline.docx Commercial (ATM Cities) Tariff - Redline.docx Industrial (ATM Cities) Tariff - Redline.docx Transportation (ATM Cities) Tariff - Redline.docx 3. Proposed implementation Date (60 days from date of filing): Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Rate Schedules Please also provide clean and redlined electronic copies of the proposed rate schedules in Microsoft Word with the filing. April 25, 2023. IRA-3 Rate Schedules Page 1 of 1 138 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: R – RESIDENTIAL SALES APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Application Applicable to Residential Customers for all natural gas provided at one Point of Delivery and measured through one meter. Type of Service Where service of the type desired by Customer is not already available at the Point of Delivery, additional charges and special contract arrangements between Company and Customer may be required prior to service being furnished. Monthly Rate Customer's monthly bill will be calculated by adding the following Customer and Ccf charges to the amounts due under the riders listed below: Charge Amount Customer Charge per Bill $ 18.85 per month Rider CEE Surcharge $ 0.05 per month1 Interim Rate Adjustment (“IRA”) $ 22.33 per month2 Total Customer Charge $ 41.23 per month Commodity Charge – All Ccf $0.14846 per Ccf Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated in accordance with Part (a) and Part (b), respectively, of Rider GCR. Weather Normalization Adjustment: Plus or Minus an amount for weather normalization calculated in accordance with Rider WNA. Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated municipality. Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX. Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s). Agreement An Agreement for Gas Service may be required. Notice Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having jurisdiction and to the Company’s Tariff for Gas Service. 1Reference Rider CEE - Conservation and Energy Efficiency as approved in GUD 10170. Surcharge billing effective July 1, 2022. 22018 IRA - $2.84, 2019 IRA - $4.71, 2020 IRA - $4.54, 2021 IRA - $5.15, 2022 IRA - $5.09. 139 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: R – RESIDENTIAL SALES APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Exhibit A Cities in the Atmos Texas Municipalities Coalition: AUSTIN STAR HARBOR BALCH SPRINGS TRINIDAD BANDERA WHITNEY BLOOMING GROVE BURNET CAMERON CEDAR PARK CLIFTON COMMERCE COPPERAS COVE CORSICANA ELECTRA FREDERICKSBURG GATESVILLE GOLDTHWAITE GRANBURY GREENVILLE GROESBECK HAMILTON HEATH HENRIETTA HICKORY CREEK HICO HILLSBORO LAMPASAS LEANDER LONGVIEW MARBLE FALLS MART MEXIA OLNEY PFLUGERVILLE POINT PRINCETON RANGER RICE RIESEL ROCKDALE ROGERS ROUND ROCK SAN ANGELO SANGER SOMERVILLE 140 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: C – COMMERCIAL SALES APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Application Applicable to Commercial Customers for all natural gas provided at one Point of Delivery and measured through one meter and to Industrial Customers with an average annual usage of less than 30,000 Ccf. Type of Service Where service of the type desired by Customer is not already available at the Point of Delivery, additional charges and special contract arrangements between Company and Customer may be required prior to service being furnished. Monthly Rate Customer's monthly bill will be calculated by adding the following Customer and Ccf charges to the amounts due under the riders listed below: Charge Amount Customer Charge per Bill $ 43.50 per month Rider CEE Surcharge $ (0.01) per month1 Interim Rate Adjustment (“IRA”) $ 70.86 per month2 Total Customer Charge $ 114.35 per month Commodity Charge – All Ccf $ 0.09165 per Ccf Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated in accordance with Part (a) and Part (b), respectively, of Rider GCR. Weather Normalization Adjustment: Plus or Minus an amount for weather normalization calculated in accordance with Rider WNA. Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated municipality. Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX. Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s). Agreement An Agreement for Gas Service may be required. Notice Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having jurisdiction and to the Company’s Tariff for Gas Service. Presumption of Plant Protection Level For service under this Rate Schedule, plant protection volumes are presumed to be 10% of normal, regular, historical usage as reasonably calculated by the Company in its sole discretion. If a customer believes it needs to be modeled at an alternative plant protection volume, it should contact the company at mdtx.plantprotection@atmosenergy.com. 1 Reference Rider CEE - Conservation and Energy Efficiency as approved in GUD 10170. Surcharge billing effective July 1, 2022. 2 2018 IRA - $8.74, 2019 IRA - $14.54, 2020 IRA - $14.48, 2021 IRA - $16.47, 2022 IRA - $16.63. 141 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: C – COMMERCIAL SALES APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Exhibit A Cities in the Atmos Texas Municipalities Coalition: AUSTIN STAR HARBOR BALCH SPRINGS TRINIDAD BANDERA WHITNEY BLOOMING GROVE BURNET CAMERON CEDAR PARK CLIFTON COMMERCE COPPERAS COVE CORSICANA ELECTRA FREDERICKSBURG GATESVILLE GOLDTHWAITE GRANBURY GREENVILLE GROESBECK HAMILTON HEATH HENRIETTA HICKORY CREEK HICO HILLSBORO LAMPASAS LEANDER LONGVIEW MARBLE FALLS MART MEXIA OLNEY PFLUGERVILLE POINT PRINCETON RANGER RICE RIESEL ROCKDALE ROGERS ROUND ROCK SAN ANGELO SANGER SOMERVILLE 142 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: I – INDUSTRIAL SALES APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Application Applicable to Industrial Customers with a maximum daily usage (MDU) of less than 200 MMBtu per day for all natural gas provided at one Point of Delivery and measured through one meter. Service for Industrial Customers with an MDU equal to or greater than 200 MMBtu per day will be provided at Company's sole option and will require special contract arrangements between Company and Customer. Type of Service Where service of the type desired by Customer is not already available at the Point of Delivery, additional charges and special contract arrangements between Company and Customer may be required prior to service being furnished. Monthly Rate Customer's monthly bill will be calculated by adding the following Customer and MMBtu charges to the amounts due under the riders listed below: Charge Amount Customer Charge per Meter $ 784.00 per month Interim Rate Adjustment (“IRA”) $ 1,295.43 per month1 Total Customer Charge $ 2,079.43 per month First 0 MMBtu to 1,500 MMBtu $ 0.3312 per MMBtu Next 3,500 MMBtu $ 0.2425 per MMBtu All MMBtu over 5,000 MMBtu $ 0.0520 per MMBtu Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated in accordance with Part (a) and Part (b), respectively, of Rider GCR. Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated municipality. Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX. Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s). Curtailment Overpull Fee Upon notification by Company of an event of curtailment or interruption of Customer’s deliveries, Customer will, for each MMBtu delivered in excess of the stated level of curtailment or interruption, pay Company 200% of the midpoint price for the Katy point listed in Platts Gas Daily published for the applicable Gas Day in the table entitled “Daily Price Survey.” 1 2018 IRA - $155.80, 2019 IRA - $261.93, 2020 IRA - $261.77, 2021 IRA - $309.07, 2022 IRA - $306.86. 143 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: I – INDUSTRIAL SALES APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Replacement Index In the event the “midpoint” or “common” price for the Katy point listed in Platts Gas Daily in the table entitled “Daily Price Survey” is no longer published, Company will calculate the applicable imbalance fees utilizing a daily price index recognized as authoritative by the natural gas industry and most closely approximating the applicable index. Agreement An Agreement for Gas Service may be required. Notice Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having jurisdiction and to the Company’s Tariff for Gas Service. Special Conditions In order to receive service under Rate I, Customer must have the type of meter required by Company. Customer must pay Company all costs associated with the acquisition and installation of the meter. Presumption of Plant Protection Level For service under this Rate Schedule, plant protection volumes are presumed to be 10% of normal, regular, historical usage as reasonably calculated by the Company in its sole discretion. If a customer believes it needs to be modeled at an alternative plant protection volume, it should contact the company at mdtx.plantprotection@atmosenergy.com. 144 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: I – INDUSTRIAL SALES APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Exhibit A Cities in the Atmos Texas Municipalities Coalition: AUSTIN STAR HARBOR BALCH SPRINGS TRINIDAD BANDERA WHITNEY BLOOMING GROVE BURNET CAMERON CEDAR PARK CLIFTON COMMERCE COPPERAS COVE CORSICANA ELECTRA FREDERICKSBURG GATESVILLE GOLDTHWAITE GRANBURY GREENVILLE GROESBECK HAMILTON HEATH HENRIETTA HICKORY CREEK HICO HILLSBORO LAMPASAS LEANDER LONGVIEW MARBLE FALLS MART MEXIA OLNEY PFLUGERVILLE POINT PRINCETON RANGER RICE RIESEL ROCKDALE ROGERS ROUND ROCK SAN ANGELO SANGER SOMERVILLE 145 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: T – TRANSPORTATION APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Application Applicable, in the event that Company has entered into a Transportation Agreement, to a customer directly connected to the Atmos Energy Corp., Mid-Tex Division Distribution System (Customer) for the transportation of all natural gas supplied by Customer or Customer’s agent at one Point of Delivery for use in Customer's facility. Type of Service Where service of the type desired by Customer is not already available at the Point of Delivery, additional charges and special contract arrangements between Company and Customer may be required prior to service being furnished. Monthly Rate Customer's bill will be calculated by adding the following Customer and MMBtu charges to the amounts and quantities due under the riders listed below: Charge Amount Customer Charge per Meter $ 784.00 per month Interim Rate Adjustment (“IRA”) $ 1,295.43 per month1 Total Customer Charge $ 2,079.43 per month First 0 MMBtu to 1,500 MMBtu $ 0.3312 per MMBtu Next 3,500 MMBtu $ 0.2425 per MMBtu All MMBtu over 5,000 MMBtu $ 0.0520 per MMBtu Upstream Transportation Cost Recovery: Plus an amount for upstream transportation costs in accordance with Part (b) of Rider GCR. Retention Adjustment: Plus a quantity of gas as calculated in accordance with Rider RA. Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated municipality. Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX. Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s). Imbalance Fees All fees charged to Customer under this Rate Schedule will be charged based on the quantities determined under the applicable Transportation Agreement and quantities will not be aggregated for any Customer with multiple Transportation Agreements for the purposes of such fees. 1 2018 IRA - $155.80, 2019 IRA - $261.93, 2020 IRA - $261.77, 2021 IRA – 309.07, 306.86. 146 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: T – TRANSPORTATION APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Monthly Imbalance Fees Customer shall pay Company the greater of (i) $0.10 per MMBtu, or (ii) 150% of the difference per MMBtu between the highest and lowest “midpoint” price for the Katy point listed in Platts Gas Daily in the table entitled “Daily Price Survey” during such month, for the MMBtu of Customer’s monthly Cumulative Imbalance, as defined in the applicable Transportation Agreement, at the end of each month that exceeds 10% of Customer’s receipt quantities for the month. Curtailment Overpull Fee Upon notification by Company of an event of curtailment or interruption of Customer’s deliveries, Customer will, for each MMBtu delivered in excess of the stated level of curtailment or interruption, pay Company 200% of the midpoint price for the Katy point listed in Platts Gas Daily published for the applicable Gas Day in the table entitled “Daily Price Survey.” Replacement Index In the event the “midpoint” or “common” price for the Katy point listed in Platts Gas Daily in the table entitled “Daily Price Survey” is no longer published, Company will calculate the applicable imbalance fees utilizing a daily price index recognized as authoritative by the natural gas industry and most closely approximating the applicable index. Agreement A transportation agreement is required. Notice Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having jurisdiction and to the Company’s Tariff for Gas Service. Special Conditions In order to receive service under Rate T, customer must have the type of meter required by Company. Customer must pay Company all costs associated with the acquisition and installation of the meter. 147 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: T – TRANSPORTATION APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Exhibit A Cities in the Atmos Texas Municipalities Coalition: AUSTIN STAR HARBOR BALCH SPRINGS TRINIDAD BANDERA WHITNEY BLOOMING GROVE BURNET CAMERON CEDAR PARK CLIFTON COMMERCE COPPERAS COVE CORSICANA ELECTRA FREDERICKSBURG GATESVILLE GOLDTHWAITE GRANBURY GREENVILLE GROESBECK HAMILTON HEATH HENRIETTA HICKORY CREEK HICO HILLSBORO LAMPASAS LEANDER LONGVIEW MARBLE FALLS MART MEXIA OLNEY PFLUGERVILLE POINT PRINCETON RANGER RICE RIESEL ROCKDALE ROGERS ROUND ROCK SAN ANGELO SANGER SOMERVILLE 148 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: R – RESIDENTIAL SALES APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Deleted: RRC Tariff No: 33012 Deleted: Bills Rendered on or after 07/01/2022 Deleted: PAGE 31 Application Applicable to Residential Customers for all natural gas provided at one Point of Delivery and measured through one meter. Type of Service Where service of the type desired by Customer is not already available at the Point of Delivery, additional charges and special contract arrangements between Company and Customer may be required prior to service being furnished. Monthly Rate Customer's monthly bill will be calculated by adding the following Customer and Ccf charges to the amounts due under the riders listed below: Charge Amount Customer Charge per Bill $ 18.85 per month Rider CEE Surcharge $ 0.05 per month1 Interim Rate Adjustment (“IRA”) $ 22.33 per month2 Total Customer Charge $ 41.23 per month Commodity Charge – All Ccf $0.14846 per Ccf Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated in accordance with Part (a) and Part (b), respectively, of Rider GCR. Weather Normalization Adjustment: Plus or Minus an amount for weather normalization calculated in accordance with Rider WNA. Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated municipality. Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX. Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s). Agreement An Agreement for Gas Service may be required. Notice Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having jurisdiction and to the Company’s Tariff for Gas Service. 1Reference Rider CEE - Conservation and Energy Efficiency as approved in GUD 10170. Surcharge billing effective July 1, 2022. 22018 IRA - $2.84, 2019 IRA - $4.71, 2020 IRA - $4.54, 2021 IRA - $5.15, 2022 IRA - $5.09. Deleted: 17.24 Deleted: Deleted: 36.14 149 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: R – RESIDENTIAL SALES APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Deleted: RRC Tariff No: 33012 Deleted: Bills Rendered on or after 10/01/2022 Deleted: PAGE 32 Exhibit A Cities in the Atmos Texas Municipalities Coalition: AUSTIN STAR HARBOR BALCH SPRINGS TRINIDAD BANDERA WHITNEY BLOOMING GROVE BURNET CAMERON CEDAR PARK CLIFTON COMMERCE COPPERAS COVE CORSICANA ELECTRA FREDERICKSBURG GATESVILLE GOLDTHWAITE GRANBURY GREENVILLE GROESBECK HAMILTON HEATH HENRIETTA HICKORY CREEK HICO HILLSBORO LAMPASAS LEANDER LONGVIEW MARBLE FALLS MART MEXIA OLNEY PFLUGERVILLE POINT PRINCETON RANGER RICE RIESEL ROCKDALE ROGERS ROUND ROCK SAN ANGELO SANGER SOMERVILLE 150 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: C – COMMERCIAL SALES APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Deleted: RRC Tariff No: 33011 Deleted: Bills Rendered on or after 09/01/2022 Deleted: PAGE 33 Application Applicable to Commercial Customers for all natural gas provided at one Point of Delivery and measured through one meter and to Industrial Customers with an average annual usage of less than 30,000 Ccf. Type of Service Where service of the type desired by Customer is not already available at the Point of Delivery, additional charges and special contract arrangements between Company and Customer may be required prior to service being furnished. Monthly Rate Customer's monthly bill will be calculated by adding the following Customer and Ccf charges to the amounts due under the riders listed below: Charge Amount Customer Charge per Bill $ 43.50 per month Rider CEE Surcharge $ (0.01) per month1 Interim Rate Adjustment (“IRA”) $ 70.86 per month2 Total Customer Charge $ 114.35 per month Commodity Charge – All Ccf $ 0.09165 per Ccf Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated in accordance with Part (a) and Part (b), respectively, of Rider GCR. Weather Normalization Adjustment: Plus or Minus an amount for weather normalization calculated in accordance with Rider WNA. Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated municipality. Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX. Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s). Agreement An Agreement for Gas Service may be required. Notice Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having jurisdiction and to the Company’s Tariff for Gas Service. Presumption of Plant Protection Level For service under this Rate Schedule, plant protection volumes are presumed to be 10% of normal, regular, historical usage as reasonably calculated by the Company in its sole discretion. If a customer believes it needs to be modeled at an alternative plant protection volume, it should contact the company at mdtx.plantprotection@atmosenergy.com. 1 Reference Rider CEE - Conservation and Energy Efficiency as approved in GUD 10170. Surcharge billing effective July 1, 2022. 2 2018 IRA - $8.74, 2019 IRA - $14.54, 2020 IRA - $14.48, 2021 IRA - $16.47, 2022 IRA - $16.63. Deleted: 54.23 Deleted: Deleted: 97.72 151 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: C – COMMERCIAL SALES APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Deleted: RRC Tariff No: 33011 Deleted: Bills Rendered on or after10/01/2022 Deleted: PAGE 34 Exhibit A Cities in the Atmos Texas Municipalities Coalition: AUSTIN STAR HARBOR BALCH SPRINGS TRINIDAD BANDERA WHITNEY BLOOMING GROVE BURNET CAMERON CEDAR PARK CLIFTON COMMERCE COPPERAS COVE CORSICANA ELECTRA FREDERICKSBURG GATESVILLE GOLDTHWAITE GRANBURY GREENVILLE GROESBECK HAMILTON HEATH HENRIETTA HICKORY CREEK HICO HILLSBORO LAMPASAS LEANDER LONGVIEW MARBLE FALLS MART MEXIA OLNEY PFLUGERVILLE POINT PRINCETON RANGER RICE RIESEL ROCKDALE ROGERS ROUND ROCK SAN ANGELO SANGER SOMERVILLE 152 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: I – INDUSTRIAL SALES APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Deleted: RRC Tariff No: 33010 Deleted: Bills Rendered on or after 01/31/2023 Deleted: PAGE 35 Application Applicable to Industrial Customers with a maximum daily usage (MDU) of less than 200 MMBtu per day for all natural gas provided at one Point of Delivery and measured through one meter. Service for Industrial Customers with an MDU equal to or greater than 200 MMBtu per day will be provided at Company's sole option and will require special contract arrangements between Company and Customer. Type of Service Where service of the type desired by Customer is not already available at the Point of Delivery, additional charges and special contract arrangements between Company and Customer may be required prior to service being furnished. Monthly Rate Customer's monthly bill will be calculated by adding the following Customer and MMBtu charges to the amounts due under the riders listed below: Charge Amount Customer Charge per Meter $ 784.00 per month Interim Rate Adjustment (“IRA”) $ 1,295.43 per month1 Total Customer Charge $ 2,079.43 per month First 0 MMBtu to 1,500 MMBtu $ 0.3312 per MMBtu Next 3,500 MMBtu $ 0.2425 per MMBtu All MMBtu over 5,000 MMBtu $ 0.0520 per MMBtu Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated in accordance with Part (a) and Part (b), respectively, of Rider GCR. Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated municipality. Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX. Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s). Curtailment Overpull Fee Upon notification by Company of an event of curtailment or interruption of Customer’s deliveries, Customer will, for each MMBtu delivered in excess of the stated level of curtailment or interruption, pay Company 200% of the midpoint price for the Katy point listed in Platts Gas Daily published for the applicable Gas Day in the table entitled “Daily Price Survey.” 1 2018 IRA - $155.80, 2019 IRA - $261.93, 2020 IRA - $261.77, 2021 IRA - $309.07, 2022 IRA - $306.86. Deleted: 988.57 Deleted: 1,772.57 153 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: I – INDUSTRIAL SALES APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Deleted: RRC Tariff No: 33010 Deleted: Bills Rendered on or after 01/31/2023 Deleted: PAGE 36 Replacement Index In the event the “midpoint” or “common” price for the Katy point listed in Platts Gas Daily in the table entitled “Daily Price Survey” is no longer published, Company will calculate the applicable imbalance fees utilizing a daily price index recognized as authoritative by the natural gas industry and most closely approximating the applicable index. Agreement An Agreement for Gas Service may be required. Notice Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having jurisdiction and to the Company’s Tariff for Gas Service. Special Conditions In order to receive service under Rate I, Customer must have the type of meter required by Company. Customer must pay Company all costs associated with the acquisition and installation of the meter. Presumption of Plant Protection Level For service under this Rate Schedule, plant protection volumes are presumed to be 10% of normal, regular, historical usage as reasonably calculated by the Company in its sole discretion. If a customer believes it needs to be modeled at an alternative plant protection volume, it should contact the company at mdtx.plantprotection@atmosenergy.com. 154 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: I – INDUSTRIAL SALES APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Deleted: RRC Tariff No: 33010 Deleted: Bills Rendered on or after 01/31/2023 Deleted: PAGE 37 Exhibit A Cities in the Atmos Texas Municipalities Coalition: AUSTIN STAR HARBOR BALCH SPRINGS TRINIDAD BANDERA WHITNEY BLOOMING GROVE BURNET CAMERON CEDAR PARK CLIFTON COMMERCE COPPERAS COVE CORSICANA ELECTRA FREDERICKSBURG GATESVILLE GOLDTHWAITE GRANBURY GREENVILLE GROESBECK HAMILTON HEATH HENRIETTA HICKORY CREEK HICO HILLSBORO LAMPASAS LEANDER LONGVIEW MARBLE FALLS MART MEXIA OLNEY PFLUGERVILLE POINT PRINCETON RANGER RICE RIESEL ROCKDALE ROGERS ROUND ROCK SAN ANGELO SANGER SOMERVILLE 155 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: T – TRANSPORTATION APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Deleted: RRC Tariff No: 33009 Deleted: Bills Rendered on or after 06/10/2022 Deleted: PAGE 38 Application Applicable, in the event that Company has entered into a Transportation Agreement, to a customer directly connected to the Atmos Energy Corp., Mid-Tex Division Distribution System (Customer) for the transportation of all natural gas supplied by Customer or Customer’s agent at one Point of Delivery for use in Customer's facility. Type of Service Where service of the type desired by Customer is not already available at the Point of Delivery, additional charges and special contract arrangements between Company and Customer may be required prior to service being furnished. Monthly Rate Customer's bill will be calculated by adding the following Customer and MMBtu charges to the amounts and quantities due under the riders listed below: Charge Amount Customer Charge per Meter $ 784.00 per month Interim Rate Adjustment (“IRA”) $ 1,295.43 per month1 Total Customer Charge $ 2,079.43 per month First 0 MMBtu to 1,500 MMBtu $ 0.3312 per MMBtu Next 3,500 MMBtu $ 0.2425 per MMBtu All MMBtu over 5,000 MMBtu $ 0.0520 per MMBtu Upstream Transportation Cost Recovery: Plus an amount for upstream transportation costs in accordance with Part (b) of Rider GCR. Retention Adjustment: Plus a quantity of gas as calculated in accordance with Rider RA. Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated municipality. Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX. Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s). Imbalance Fees All fees charged to Customer under this Rate Schedule will be charged based on the quantities determined under the applicable Transportation Agreement and quantities will not be aggregated for any Customer with multiple Transportation Agreements for the purposes of such fees. 1 2018 IRA - $155.80, 2019 IRA - $261.93, 2020 IRA - $261.77, 2021 IRA – 309.07, 306.86. Deleted: 988.57 Deleted: 1,772.57 156 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: T – TRANSPORTATION APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Deleted: RRC Tariff No: 33009 Deleted: Bills Rendered on or after 06/10/2022 Deleted: PAGE 39 Monthly Imbalance Fees Customer shall pay Company the greater of (i) $0.10 per MMBtu, or (ii) 150% of the difference per MMBtu between the highest and lowest “midpoint” price for the Katy point listed in Platts Gas Daily in the table entitled “Daily Price Survey” during such month, for the MMBtu of Customer’s monthly Cumulative Imbalance, as defined in the applicable Transportation Agreement, at the end of each month that exceeds 10% of Customer’s receipt quantities for the month. Curtailment Overpull Fee Upon notification by Company of an event of curtailment or interruption of Customer’s deliveries, Customer will, for each MMBtu delivered in excess of the stated level of curtailment or interruption, pay Company 200% of the midpoint price for the Katy point listed in Platts Gas Daily published for the applicable Gas Day in the table entitled “Daily Price Survey.” Replacement Index In the event the “midpoint” or “common” price for the Katy point listed in Platts Gas Daily in the table entitled “Daily Price Survey” is no longer published, Company will calculate the applicable imbalance fees utilizing a daily price index recognized as authoritative by the natural gas industry and most closely approximating the applicable index. Agreement A transportation agreement is required. Notice Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having jurisdiction and to the Company’s Tariff for Gas Service. Special Conditions In order to receive service under Rate T, customer must have the type of meter required by Company. Customer must pay Company all costs associated with the acquisition and installation of the meter. 157 Item 10. MID-TEX DIVISION ATMOS ENERGY CORPORATION RATE SCHEDULE: T – TRANSPORTATION APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS MUNICIPALITIES COALITION (“ATM”) EFFECTIVE DATE: Deleted: RRC Tariff No: 33009 Deleted: Bills Rendered on or after 10/01/2022 Deleted: PAGE 40 Exhibit A Cities in the Atmos Texas Municipalities Coalition: AUSTIN STAR HARBOR BALCH SPRINGS TRINIDAD BANDERA WHITNEY BLOOMING GROVE BURNET CAMERON CEDAR PARK CLIFTON COMMERCE COPPERAS COVE CORSICANA ELECTRA FREDERICKSBURG GATESVILLE GOLDTHWAITE GRANBURY GREENVILLE GROESBECK HAMILTON HEATH HENRIETTA HICKORY CREEK HICO HILLSBORO LAMPASAS LEANDER LONGVIEW MARBLE FALLS MART MEXIA OLNEY PFLUGERVILLE POINT PRINCETON RANGER RICE RIESEL ROCKDALE ROGERS ROUND ROCK SAN ANGELO SANGER SOMERVILLE 158 Item 10. Line No.Rate Class Current* Proposed Difference % Change (a) (b) (c) (d) (e) (f) 10 11 Residential Tariff (Rate R) 12 Customer Charge per Bill 36.14$ 41.23$ 5.09$ 14.08% 13 Consumption Charge (Ccf) 0.14846$ 0.14846$ -$ 0.00% 14 Average Monthly Bill @ 34.6 Ccf 77.05$ 82.14$ 5.09$ 6.61% 15 16 Commercial Tariff (Rate C) 17 Customer Charge per Bill 97.72$ 114.35$ 16.63$ 17.02% 18 Consumption Charge (Ccf) 0.09165$ 0.09165$ -$ 0.00% 19 Average Monthly Bill @ 272.3 Ccf 373.77$ 390.40$ 16.63$ 4.45% 20 21 Industrial Tariff (Rate I) 22 Customer Charge per Meter 1,772.57$ 2,079.43$ 306.86$ 17.31% 23 First 1,500 MMBtu 0.3312$ 0.3312$ -$ 0.00% 24 Next 3,500 MMBtu 0.2425$ 0.2425$ -$ 0.00% 25 Over 5,000 MMBtu 0.0520$ 0.0520$ -$ 0.00% 26 Average Monthly Bill @ 4,113.8 MMBtu 30,662.19$ 30,969.05$ 306.86$ 1.00% 27 28 Transportation Tariff (Rate T) 29 Customer Charge per Meter 1,772.57$ 2,079.43$ 306.86$ 17.31% 30 First 1,500 MMBtu 0.3312$ 0.3312$ -$ 0.00% 31 Next 3,500 MMBtu 0.2425$ 0.2425$ -$ 0.00% 32 Over 5,000 MMBtu 0.0520$ 0.0520$ -$ 0.00% 33 Average Monthly Bill @ 4,113.8 MMBtu 4,810.83$ 5,117.69$ 306.86$ 6.38% 34 35 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Bill Comparisons Current and Proposed Bill Information - With Gas Cost IRA-4 Bill Comparisons Page 1 of 2 159 Item 10. Line No.Rate Class Current* Proposed Difference % Change (a) (b) (c) (d) (e) (f) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Bill Comparisons 36 37 Residential Tariff (Rate R) 38 Customer Charge per Bill 36.14$ 41.23$ 5.09$ 14.08% 39 Consumption Charge (Ccf) 0.14846$ 0.14846$ -$ 0.00% 40 Average Monthly Bill @ 34.6 Ccf 41.28$ 46.37$ 5.09$ 12.33% 41 42 Commercial Tariff (Rate C) 43 Customer Charge per Bill 97.72$ 114.35$ 16.63$ 17.02% 44 Consumption Charge (Ccf) 0.09165$ 0.09165$ -$ 0.00% 45 Average Monthly Bill @ 272.3 Ccf 122.68$ 139.31$ 16.63$ 13.56% 46 47 Industrial Tariff (Rate I) 48 Customer Charge per Meter 1,772.57$ 2,079.43$ 306.86$ 17.31% 49 First 1,500 MMBtu 0.3312$ 0.3312$ -$ 0.00% 50 Next 3,500 MMBtu 0.2425$ 0.2425$ -$ 0.00% 51 Over 5,000 MMBtu 0.0520$ 0.0520$ -$ 0.00% 52 Average Monthly Bill @ 4,113.8 MMBtu 2,903.22$ 3,210.08$ 306.86$ 10.57% 53 54 Transportation Tariff (Rate T) 55 Customer Charge per Meter 1,772.57$ 2,079.43$ 306.86$ 17.31% 56 First 1,500 MMBtu 0.3312$ 0.3312$ -$ 0.00% 57 Next 3,500 MMBtu 0.2425$ 0.2425$ -$ 0.00% 58 Over 5,000 MMBtu 0.0520$ 0.0520$ -$ 0.00% 59 Average Monthly Bill @ 4,113.8 MMBtu 2,903.22$ 3,210.08$ 306.86$ 10.57% 60 61 Note: 62 *Current rates - Please see IRA-1 General Information, No. 14. Current and Proposed Bill Information - Without Gas Cost IRA-4 Bill Comparisons Page 2 of 2 160 Item 10. Line No. Description Ref As per GUD No. 10779 At 12/31/21 (1) Per Book As of 12/31/2022 Adjustments Per Book Adjusted As of 12/31/2022 Change in Investment (a) (b) (c) (d) (e) (f) = (g) - (e) (g) (h) = (g) - (d) 11 Direct Utility Plant Investment 7,559,007,901$ 8,489,069,333$ 39,340,362$ 8,528,409,695$ 969,401,794$ 12 Direct Accumulated Depreciation 1,534,215,140 1,725,907,746 (77,920,089) 1,647,987,657 113,772,518 13 Allocated Utility Plant Investment (If applicable) 163,993,774 175,185,343 (2,967,706) 172,217,636 8,223,862 14 Allocated Accumulated Depreciation (If applicable) 76,093,289 87,337,936 (892,745) 86,445,190 10,351,902 15 Miscellaneous Adjustments (20,707,171) (21,912,242) (21,912,242) (1,205,072) 16 Net Utility Plant Investment (Ln 11 - 12 + 13 - 14 + 15) 6,091,986,077$ 6,851,008,994$ 93,273,247$ 6,944,282,241$ 852,296,165$ 17 18 Calculation of the Interim Rate Adjustment Amount: 19 Rate of Return IRA-1 7.97% 20 Return Col (h), Ln 16 times Col (h), Ln 19 67,902,435$ 21 Depreciation Expense IRA-8 plus IRA-11 27,788,833 22 Property-related Taxes (Ad Valorem) IRA-21 19,642,659 23 Revenue-related Taxes and State Margin Tax 2 - 24 Federal Income Tax IRA-20 13,362,493 25 Interim Rate Adjustment Amount (Sum of Ln 20 through Ln 24)128,696,421$ 26 27 Interim Rate Adjustment Amount per Rate Class: Allocation Factors per GUD No. 10779: Total Service Area: ATM Jurisdiction: 28 Rate Schedule R 77.95% 100,323,345$ 10,321,237$ 29 Rate Schedule C 19.40% 24,966,931 2,205,737 30 Rate Schedule I and T 2.65% 3,406,146 298,268 31 Total (Sum of Ln 28 through Ln 30)100.00% 128,696,421$ 12,825,242$ 32 33 Monthly Customer Charge Adjustment: Annual Service Area Bill Count: Annual ATM Jurisdiction Bill Count: Monthly Customer Charge Adjustment: 34 Rate Schedule R 19,691,520 2,027,748 5.09$ 35 Rate Schedule C 1,501,536 132,636 16.63$ 36 Rate Schedule I and T 11,100 972 306.86$ 37 Total (Sum of Ln 34 through Ln 36)21,204,156 2,161,356 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Interim Rate Adjustment Summary IRA-5 IRA Summary Page 1 of 2 161 Item 10. Line No. Description Ref As per GUD No. 10779 At 12/31/21 (1) Per Book As of 12/31/2022 Adjustments Per Book Adjusted As of 12/31/2022 Change in Investment (a) (b) (c) (d) (e) (f) = (g) - (e) (g) (h) = (g) - (d) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Interim Rate Adjustment Summary 38 - OR - 39 Monthly Initial Block Rate Adjustment: Annual Service Area Volumes: Annual ATM Jurisdiction Volumes: Monthly Initial Block Rate Adjustment: 40 Rate Schedule R N/A N/A N/A 41 Rate Schedule C N/A N/A N/A 42 Rate Schedule I and T N/A N/A N/A 43 44 Current Customer Charge Other Adjustments Current Year IRA Adjustment Proposed Customer Charge 45 Change to Customer Charge 3 46 Rate Schedule R 18.85$ 17.29$ 5.09$ 41.23$ 47 Rate Schedule C 43.50$ 54.22$ 16.63$ 114.35$ 48 Rate Schedule I and T 784.00$ 988.57$ 306.86$ 2,079.43$ 49 50 Notes: 51 1. The amounts are updated as per GUD No. 10779 Final Order. 52 2. Revenue related taxes are collected through Rider FF and Rider TAX. 53 3. Column (d) is from GUD No. 10779, Final Order, Finding of Fact 47. Column (e) encompasses the Rider CEE Tariff per the Compliance Filing (2021-2022 CEE Program Report), the Mid-Tex ATM IRA Filing (2018, 2019, 2020, and 2021). IRA-5 IRA Summary Page 2 of 2 162 Item 10. Line No. Description Prior Year Allocation Factors (1) Current Year Allocation Factors (2) Amounts or Factors (a) (b) (c) (d) (e) 10 SSU General Office (Division 002) 40.26% 40.09% 11 12 SSU General Office - Greenville Data Center 14.16% 14.18% 13 14 SSU General Office - Distribution and Marketing 50.74% 51.13% 15 16 SSU General Office - Aligne Pipe Projects 5.89% 6.13% 17 18 SSU Customer Support (Division 012) 52.74% 53.00% 19 20 SSU Customer Support - Charles K. Vaughn Training Center 75.72% 71.83% 21 22 23 Weighted Average Cost of Capital Table (3):Capital Structure Cost Weighted Cost 24 (b)(c) (d) (e) = (c) * (d) 25 26 Common Equity 60.18% 9.80% 5.90% 27 Debt 39.82% 5.20% 2.07% 28 Total 100.00% 7.97% 29 30 31 Return Factor - GUD No. 10779 Final Order, Sch. G, Col (b), Ln 20 7.97% 32 33 34 Federal Income Tax Factor Calculation ((1 / .79) * (.21)) (4)26.58% 35 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocation Factors IRA-5A Allocation Factors Page 1 of 2 163 Item 10. Line No. Description Prior Year Allocation Factors (1) Current Year Allocation Factors (2) Amounts or Factors (a) (b) (c) (d) (e) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocation Factors 36 Allocation Factors: 37 Rate Schedule R GUD No. 10779 Final Order, Finding of Fact 46 (f) 77.95% 38 Rate Schedule C GUD No. 10779 Final Order, Finding of Fact 46 (f) 19.40% 39 Rate Schedule I and T GUD No. 10779 Final Order, Finding of Fact 46 (f) 2.65% 40 Total Sum of Ln 37 through Ln 39 100.00% 41 42 2022 Year-end Number of Customers (Rate R and C) / Number of Meters (Rate I and T) times 12: (5) 43 Rate Schedule R 19,691,520 44 Rate Schedule C 1,501,536 45 Rate Schedule I and T 11,100 46 Total Sum of Ln 43 through Ln 45 21,204,156 47 48 Notes: 49 1. The allocation factors above are for Fiscal Year 2022 and based on the 4-factor formula. 50 2. The allocation factors above are for Fiscal Year 2023 and based on the 4-factor formula. 51 3. Capital Structure and Cost Components are per GUD No. 10779, Final Order, Finding of Facts 42 through 45. 52 4. The Federal Income Tax rate of 21% as per GUD No. 10779, Final Order, Finding of Fact 46 (e). 53 5. Utilizing the current year number of customers or meters is per the methodology in GUD No. 9560 Final Order, Finding of Fact 49. IRA-5A Allocation Factors Page 2 of 2 164 Item 10. Line No. Description Ref Adjustments Total Adjustments (a) (b) (c) (d) (e) 11 GUD No. 10779 Miscellaneous Adjustments: 12 To remove the Rate Base Adjustments as of December 31, 2017 per the Final Order, Exhibit B, Page 4 of 4, Ln 8. 1 (11,532,315)$ 13 Ending Balance, 2017 Miscellaneous Adjustments (11,532,315)$ 14 15 2018 Miscellaneous Adjustments: 16 To reverse the Amortized Rate Base Adjustments as of December 31, 2017.1 11,532,315$ 17 To remove the Amortized Rate Base Adjustments as of December 31, 2018.1 (11,018,187) 18 To remove CY2018 Employee Expense Account Charges from Mid-Tex and SSU 2018 Additions.2 (113,619) 19 To remove CY2018 Employee Related Expenses found through the 5400 subaccount review.3 (132,799) 20 To remove CY2018 Employee Related Expenses found through the 900 account review.3 (109,090) 21 To remove CY2018 Incentive Compensation (SSU MIP/VPP and LTIP).4 (4,635,624) 22 To remove CY2018 Severance Pay in order to reduce controversy. 6 - 23 Ending Balance, 2018 Miscellaneous Adjustments (4,477,004)$ 24 25 2019 Miscellaneous Adjustments: 26 To reverse the Amortized Rate Base Adjustments as of December 31, 2018.1 11,018,187$ 27 To remove the Amortized Rate Base Adjustments as of December 31, 2019.1 (10,504,060) 28 To remove CY2019 Employee Expense Account Charges from Mid-Tex and SSU 2019 Additions.2 (65,054) 29 To remove CY2019 Employee Related Expenses found through the 5400 subaccount review.3 (31,275) 30 To remove CY2019 Employee Related Expenses found through the 900 account review.3 82,198 31 To remove CY2019 Incentive Compensation (FY19 Proxy Statement Named Executive Officers).5 (2,382,433) 32 To remove CY2019 Severance Pay in order to reduce controversy. 6 (68,713) 33 Ending Balance, 2019 Miscellaneous Adjustments (1,951,149)$ 34 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Miscellaneous Adjustments IRA-5B Misc Adjustments Page 1 of 3 165 Item 10. Line No. Description Ref Adjustments Total Adjustments (a) (b) (c) (d) (e) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Miscellaneous Adjustments 35 2020 Miscellaneous Adjustments: 36 To reverse the Amortized Rate Base Adjustments as of December 31, 2019.1 10,504,060$ 37 To remove the Amortized Rate Base Adjustments as of December 31, 2020.1 (9,989,932) 38 To remove CY2020 Employee Expense Account Charges from Mid-Tex and SSU 2020 Additions.2 (18,824) 39 To remove CY2020 Employee Related Expenses found through the 5400 subaccount review.3 (32,158) 40 To remove CY2020 Employee Related Expenses found through the 900 account review.3 (13,478) 41 To remove CY2020 Incentive Compensation (FY20 Named Executive Officers).5 (1,992,281) 42 To remove CY2020 Severance Pay in order to reduce controversy. 6 (66,560) 43 Ending Balance, 2020 Miscellaneous Adjustments (1,609,173)$ 44 45 2021 Miscellaneous Adjustments: 46 To reverse the Amortized Rate Base Adjustments as of December 31, 2020.1 9,989,932$ 47 To remove the Amortized Rate Base Adjustments as of December 31, 2021.1 (9,475,804) 48 To remove CY2021 Employee Expense Account Charges from Mid-Tex and SSU 2021 Additions.2 (12,850) 49 To remove CY2021 Employee Related Expenses found through the 5400 subaccount review.3 (4,920) 50 To remove CY2021 Employee Related Expenses found through the 900 account review.3 (10,153) 51 To remove CY2021 Incentive Compensation (FY21 Named Executive Officers).5 (1,613,491) 52 To remove CY2021 Severance Pay in order to reduce controversy. 6 (10,244) 53 Ending Balance, 2021 Miscellaneous Adjustments (1,137,530)$ 54 55 Total Miscellaneous Adjustments as of December 31, 2020 (IRA-5, Col (d), Ln 15)(20,707,171)$ 56 57 2022 Miscellaneous Adjustments: 58 To reverse the Amortized Rate Base Adjustments as of December 31, 2021.1 9,475,804$ 59 To remove the Amortized Rate Base Adjustments as of December 31, 2022.1 (8,961,677) 60 To remove CY2022 Employee Expense Account Charges from Mid-Tex and SSU 2022 Additions.2 (28,649) 61 To remove CY2022 Employee Related Expenses found through the 5400 subaccount review.3 (32,610) 62 To remove CY2022 Employee Related Expenses found through the 900 account review.3 (9,373) 63 To remove CY2022 Incentive Compensation (FY22 Named Executive Officers).5 (1,647,197) 64 To remove CY2022 Severance Pay in order to reduce controversy. 6 (1,370) 65 Ending Balance, 2022 Miscellaneous Adjustments (1,205,072)$ 66 67 Total Miscellaneous Adjustments as of December 31, 2021 (IRA-5, Col (g), Ln 15)(21,912,242)$ IRA-5B Misc Adjustments Page 2 of 3 166 Item 10. Line No. Description Ref Adjustments Total Adjustments (a) (b) (c) (d) (e) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Miscellaneous Adjustments 68 69 Notes: 70 1. This adjustment rolls forward the balances disallowed in GUD Nos. 9670, 9762, 9869, 10170, and 10779 Final Orders. 71 2. This adjustment removes the capital amounts of certain employee expense account charges. 72 3. This adjustment removes the capital amounts of other employee related expenses. 73 4. This adjustment removes the capital amounts associated with SSU MIP/VPP and LTIP per GUD No. 10779. 74 75 6. This adjustment removes the capital portion of severance pay. There was no severance pay during CY2018. 5. This adjustment removes the capital incentive compensation amounts associated with the Company's named executive officers per TEX. UTIL. CODE § IRA-5B Misc Adjustments Page 3 of 3 167 Item 10. Line No. FERC Account No. FERC Account Titles Ref Prior Year Adjusted Gross Plant @ 12/31/21 Depreciation Rate per GUD No. 10779 Depreciation Expense Adjusted Accumulated Depreciation @ 12/31/21 Net Plant (a) (b) (c) (d) (e) (f) (g) (h) (i) = (e) - (h) 11 1. INTANGIBLE PLANT 12 301.00 Organization -$ 0.00% -$ -$ -$ 13 302.00 Franchises and Consents 18,896 0.00% - 7,231 11,665 14 303.00 Miscellaneous Intangible Plant 709,231 0.00% - 797,603 (88,372) 15 Subtotal 728,128$ -$ 804,834$ (76,707)$ 16 17 5. DISTRIBUTION PLANT 18 374.01 Land 990,029$ 0.00% -$ 7,827$ 982,203$ 19 374.02 Land Rights 3,446,318 0.98% 33,774 1,635,206 1,811,112 20 375.00 Structures and Improvements 1,759,128 1.71% 30,081 1,114,574 644,554 21 376.00 Mains - Cathodic Protection 156,793,055 1.85% 2,900,672 41,241,624 115,551,431 22 376.01 Mains - Steel 935,258,740 3.97% 37,129,772 138,789,124 796,469,616 23 376.02 Mains - Plastic 3,372,585,466 2.21% 74,534,139 600,952,157 2,771,633,309 24 378.00 M&R Station Equipment 170,906,108 3.09% 5,280,999 36,095,607 134,810,501 25 379.00 City Gate Equipment 6,739,697 1.88% 126,706 3,652,485 3,087,212 26 380.00 Services 2,064,988,375 3.67% 75,785,073 526,885,024 1,538,103,351 27 381.00 Meters 392,724,784 3.31% 12,999,190 74,440,982 318,283,802 28 382.00 Meter Installations 211,758,624 3.66% 7,750,366 42,089,787 169,668,838 29 383.00 House Regulators 102,697,080 3.50% 3,594,398 26,740,761 75,956,319 30 385.00 Industrial M&R Station Equipment 3,246,617 2.80% 90,905 648,319 2,598,298 31 Subtotal 7,423,894,021$ 220,256,075$ 1,494,293,476$ 5,929,600,544$ 32 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Direct Initial or Prior Year Plant IRA-6 Direct Initial Plant Page 1 of 3 168 Item 10. Line No. FERC Account No. FERC Account Titles Ref Prior Year Adjusted Gross Plant @ 12/31/21 Depreciation Rate per GUD No. 10779 Depreciation Expense Adjusted Accumulated Depreciation @ 12/31/21 Net Plant (a) (b) (c) (d) (e) (f) (g) (h) (i) = (e) - (h) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Direct Initial or Prior Year Plant 33 6. GENERAL PLANT 34 389.00 Land and Land Rights 5,141,158$ 0.00% -$ 114$ 5,141,045$ 35 390.00 Structures and Improvements 62,512,912 2.54% 1,587,828 21,268,007 41,244,904 36 390.04 Air Conditioning Equipment 488,803 2.75% 13,442 90,189 398,614 37 391.00 Office Furniture and Equipment 8,573,613 4.00% 342,945 (1,165,461) 9,739,074 38 392.00 Transportation Equipment 1 740,485 9.04% 6,859 484,233 256,252 39 393.00 Stores Equipment 1 128,968 4.00% 529 41,858 87,110 40 394.00 Tools, Shop, and Garage Equipment 1 33,349,384 5.00% 171,060 12,306,698 21,042,686 41 395.00 Laboratory Equipment 1 1,507,308 10.00% 15,545 368,309 1,138,999 42 396.00 Power Operated Equipment 1 1,584,794 7.24% 2,295 724,554 860,240 43 397.00 Communication Equipment 2,362,192 6.67% 157,558 1,825,699 536,493 44 398.00 Miscellaneous Equipment 2,247,428 2.50% 56,186 1,360,222 887,206 45 399.00 Other Tangible Property 215,142 14.29% 30,744 173,732 41,410 46 399.01 Other Tangible Property - Servers Hardware 2 67,905 14.29% - 67,905 - 47 399.02 Other Tangible Property - Servers Software 245,306 14.29% 35,054 208,823 36,483 48 399.03 Other Tangible Property - Network Hardware 1,320,491 11.11% 146,707 760,346 560,144 49 399.06 Other Tangible Property - PC Hardware 12,465,036 14.29% 1,781,254 7,265,173 5,199,864 50 399.07 Other Tangible Property - PC Software 405,509 14.29% 57,947 138,202 267,307 51 399.08 Other Tangible Property - Application Software 1,029,321 14.29% 147,090 297,781 731,540 52 RWIP Retirement Work In Progress - 0.00% - (7,099,552) 7,099,552 53 Subtotal 134,385,753$ 4,553,042$ 39,116,829$ 95,268,923$ 54 55 TOTAL 7,559,007,901$ 224,809,117$ 1,534,215,140$ 6,024,792,761$ 56 Accrual for Reserve Deficiency (AR 15) - 167,842 - - 57 Adjusted Total 7,559,007,901$ 224,976,959$ 1,534,215,140$ 6,024,792,761$ 58 IRA-6 Direct Initial Plant Page 2 of 3 169 Item 10. Line No. FERC Account No. FERC Account Titles Ref Prior Year Adjusted Gross Plant @ 12/31/21 Depreciation Rate per GUD No. 10779 Depreciation Expense Adjusted Accumulated Depreciation @ 12/31/21 Net Plant (a) (b) (c) (d) (e) (f) (g) (h) (i) = (e) - (h) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Direct Initial or Prior Year Plant 59 Notes: 60 1. The following accounts have a portion of their depreciation expense capitalized to projects: 61 Account Numbers Cap Percentage 62 392 89.75% 63 393 89.74% 64 394 89.74% 65 395 89.69% 66 396 98.00% 67 2. Depreciation expense was not calculated, since the account is fully depreciated. IRA-6 Direct Initial Plant Page 3 of 3 170 Item 10. Line No. FERC Account No. FERC Account Titles Ref Adjusted Gross Plant As of 12/31/22 Depreciation Rate per GUD No. 10779 Depreciation Expense Adjusted Accumulated Depreciation As of 12/31/22 Net Plant (a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) 11 1. INTANGIBLE PLANT 12 301.00 Organization -$ 0.00% -$ -$ -$ 13 302.00 Franchises and Consents 18,896 0.00% - 7,231 11,665 14 303.00 Miscellaneous Intangible Plant 709,231 0.00% - 797,603 (88,372) 15 Subtotal 728,128$ -$ 804,834$ (76,707)$ 16 17 5. DISTRIBUTION PLANT 18 374.01 Land 990,029$ 0.00% -$ 7,827$ 982,203$ 19 374.02 Land Rights 3,446,318 0.98% 33,774 1,668,980 1,777,338 20 375.00 Structures and Improvements 1,764,181 1.71% 30,167 1,144,720 619,461 21 376.00 Mains - Cathodic Protection 175,736,711 1.85% 3,251,129 44,110,823 131,625,888 22 376.01 Mains - Steel 992,118,941 3.97% 39,387,122 132,321,040 859,797,901 23 376.02 Mains - Plastic 3,919,042,368 2.21% 86,610,836 668,660,102 3,250,382,266 24 378.00 M&R Station Equipment 189,341,688 3.09% 5,850,658 29,637,964 159,703,724 25 379.00 City Gate Equipment 6,966,029 1.88% 130,961 3,780,363 3,185,666 26 380.00 Services 2,317,761,182 3.67% 85,061,835 581,469,199 1,736,291,983 27 381.00 Meters 415,270,990 3.31% 13,745,470 76,688,442 338,582,548 28 382.00 Meter Installations 266,654,582 3.66% 9,759,558 45,328,223 221,326,359 29 383.00 House Regulators 100,979,508 3.50% 3,534,283 27,642,019 73,337,489 30 385.00 Industrial M&R Station Equipment 3,570,801 2.80% 99,982 741,436 2,829,365 31 Subtotal 8,393,643,328$ 247,495,776$ 1,613,201,138$ 6,780,442,190$ 32 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Direct Current Year Plant (Adjusted) IRA-7 Direct Current Plant Page 1 of 3 171 Item 10. Line No. FERC Account No. FERC Account Titles Ref Adjusted Gross Plant As of 12/31/22 Depreciation Rate per GUD No. 10779 Depreciation Expense Adjusted Accumulated Depreciation As of 12/31/22 Net Plant (a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Direct Current Year Plant (Adjusted) 33 6. GENERAL PLANT 34 389.00 Land and Land Rights 5,006,336$ 0.00% -$ (2,881)$ 5,009,217$ 35 390.00 Structures and Improvements 64,532,196 2.54% 1,639,118 20,332,706 44,199,490 36 390.04 Air Conditioning Equipment 559,367 2.75% 15,383 103,817 455,551 37 391.00 Office Furniture and Equipment 7,582,308 4.00% 303,292 (1,906,126) 9,488,433 38 392.00 Transportation Equipment 1 394,966 9.04% 3,928 335,428 59,538 39 393.00 Stores Equipment 1 128,968 4.00% 567 47,195 81,773 40 394.00 Tools, Shop, and Garage Equipment 1 33,392,717 5.00% 183,660 11,559,860 21,832,857 41 395.00 Laboratory Equipment 1 1,163,017 10.00% 12,793 197,154 965,863 42 396.00 Power Operated Equipment 1 1,584,794 7.24% 2,295 839,293 745,501 43 397.00 Communication Equipment 2,362,192 6.67% 157,558 1,993,181 369,011 44 398.00 Miscellaneous Equipment 2,291,203 2.50% 57,280 1,505,208 785,995 45 399.00 Other Tangible Property 185,229 14.29% 26,469 171,356 13,873 46 399.01 Other Tangible Property - Servers Hardware 2 4,377 14.29% - 4,377 - 47 399.02 Other Tangible Property - Servers Software 237,611 14.29% 33,955 235,812 1,800 48 399.03 Other Tangible Property - Network Hardware 1,561,636 11.11% 173,498 792,249 769,387 49 399.06 Other Tangible Property - PC Hardware 11,829,430 14.29% 1,690,426 6,365,203 5,464,228 50 399.07 Other Tangible Property - PC Software 396,293 14.29% 56,630 188,380 207,913 51 399.08 Other Tangible Property - Application Software 825,602 14.29% 117,979 238,592 587,009 52 RWIP Retirement Work In Progress - - (9,019,115) 9,019,115 53 Subtotal 134,038,240$ 4,474,830$ 33,981,686$ 100,056,554$ 54 55 TOTAL 8,528,409,695$ 251,970,606$ 1,647,987,657$ 6,880,422,037$ 56 Accrual for Reserve Deficiency (AR 15) - 167,124 - - 57 Adjusted Total 8,528,409,695$ 252,137,730$ 1,647,987,657$ 6,880,422,037$ 58 IRA-7 Direct Current Plant Page 2 of 3 172 Item 10. Line No. FERC Account No. FERC Account Titles Ref Adjusted Gross Plant As of 12/31/22 Depreciation Rate per GUD No. 10779 Depreciation Expense Adjusted Accumulated Depreciation As of 12/31/22 Net Plant (a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Direct Current Year Plant (Adjusted) 59 Notes: 60 1. The following accounts have a portion of their depreciation expense capitalized to projects: 61 Account Numbers Cap Percentage 62 392 89.00% 63 393 89.00% 64 394 89.00% 65 395 89.00% 66 396 98.00% 67 2. Depreciation expense was not calculated, since the account is fully depreciated. IRA-7 Direct Current Plant Page 3 of 3 173 Item 10. Line No. FERC Account No. FERC Account Titles Ref Per Book Gross Plant As of 12/31/22 Plant Adjustments Adjusted Gross Plant as of 12/31/22 Per Book Accumulated Depreciation As of 12/31/22 Accumulated Depreciation Adjustments Adjusted Accumulated Depreciation as of 12/31/22 (a) (b) (c) (d) (e) (f) (g) = (e) - (f) (h) (i) (j) = (h) - (i) 11 1. INTANGIBLE PLANT 12 301.00 Organization -$ -$ -$ -$ -$ -$ 13 302.00 Franchises and Consents 18,896 - 18,896 7,231 - 7,231 14 303.00 Miscellaneous Intangible Plant 921,324 212,093 709,231 921,324 123,721 797,603 15 Subtotal 940,220$ 212,093$ 728,128$ 928,555$ 123,721$ 804,834$ 16 17 5. DISTRIBUTION PLANT 18 374.01 Land 990,029$ -$ 990,029$ 7,827$ -$ 7,827$ 19 374.02 Land Rights 3,446,318 - 3,446,318 1,668,980 - 1,668,980 20 375.00 Structures and Improvements 1,764,181 - 1,764,181 1,144,720 - 1,144,720 21 376.00 Mains - Cathodic Protection 224,024,163 48,287,452 175,736,711 87,063,938 42,953,115 44,110,823 22 376.01 Mains - Steel 974,888,257 (17,230,684) 992,118,941 132,321,776 736 132,321,040 23 376.02 Mains - Plastic 3,850,067,754 (68,974,614) 3,919,042,368 668,903,673 243,572 668,660,102 24 378.00 M&R Station Equipment 186,664,335 (2,677,353) 189,341,688 29,637,964 - 29,637,964 25 379.00 City Gate Equipment 6,931,765 (34,264) 6,966,029 3,780,363 - 3,780,363 26 380.00 Services 2,325,626,467 7,865,285 2,317,761,182 616,028,007 34,558,807 581,469,199 27 381.00 Meters 411,964,184 (3,306,806) 415,270,990 76,688,442 - 76,688,442 28 382.00 Meter Installations 263,770,790 (2,883,792) 266,654,582 45,329,417 1,195 45,328,223 29 383.00 House Regulators 100,327,752 (651,755) 100,979,508 27,642,131 112 27,642,019 30 385.00 Industrial M&R Station Equipment 3,550,741 (20,060) 3,570,801 741,436 - 741,436 31 Subtotal 8,354,016,736$ (39,626,591)$ 8,393,643,328$ 1,690,958,674$ 77,757,536$ 1,613,201,138$ 32 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Direct Current Year Plant Adjustments IRA-7A Adjustments Direct Page 1 of 2 174 Item 10. Line No. FERC Account No. FERC Account Titles Ref Per Book Gross Plant As of 12/31/22 Plant Adjustments Adjusted Gross Plant as of 12/31/22 Per Book Accumulated Depreciation As of 12/31/22 Accumulated Depreciation Adjustments Adjusted Accumulated Depreciation as of 12/31/22 (a) (b) (c) (d) (e) (f) (g) = (e) - (f) (h) (i) (j) = (h) - (i) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Direct Current Year Plant Adjustments 33 6. GENERAL PLANT 34 389.00 Land and Land Rights 5,006,336$ -$ 5,006,336$ (2,881)$ -$ (2,881)$ 35 390.00 Structures and Improvements 64,586,417 54,222 64,532,196 20,352,632 19,927 20,332,706 36 390.04 Air Conditioning Equipment 559,367 - 559,367 103,817 - 103,817 37 391.00 Office Furniture and Equipment 7,582,308 - 7,582,308 (1,906,126) - (1,906,126) 38 392.00 Transportation Equipment 414,881 19,915 394,966 354,333 18,905 335,428 39 393.00 Stores Equipment 128,968 - 128,968 47,195 - 47,195 40 394.00 Tools, Shop, and Garage Equipment 33,392,717 - 33,392,717 11,559,860 - 11,559,860 41 395.00 Laboratory Equipment 1,163,017 - 1,163,017 197,154 - 197,154 42 396.00 Power Operated Equipment 1,584,794 - 1,584,794 839,293 - 839,293 43 397.00 Communication Equipment 2,362,192 - 2,362,192 1,993,181 - 1,993,181 44 398.00 Miscellaneous Equipment 2,291,203 - 2,291,203 1,505,208 - 1,505,208 45 399.00 Other Tangible Property 185,229 - 185,229 171,356 - 171,356 46 399.01 Other Tangible Property - Servers Hardware 4,377 - 4,377 4,377 - 4,377 47 399.02 Other Tangible Property - Servers Software 237,611 - 237,611 235,812 - 235,812 48 399.03 Other Tangible Property - Network Hardware 1,561,636 - 1,561,636 792,249 - 792,249 49 399.06 Other Tangible Property - PC Hardware 11,829,430 - 11,829,430 6,365,203 - 6,365,203 50 399.07 Other Tangible Property - PC Software 396,293 - 396,293 188,380 - 188,380 51 399.08 Other Tangible Property - Application Software 825,602 - 825,602 238,592 - 238,592 52 RWIP Retirement Work In Progress - - - (9,019,115) - (9,019,115) 53 Subtotal 134,112,377$ 74,137$ 134,038,240$ 34,020,517$ 38,832$ 33,981,686$ 54 55 TOTAL 8,489,069,333$ (39,340,362)$ 8,528,409,695$ 1,725,907,746$ 77,920,089$ 1,647,987,657$ 56 Miscellaneous Adjustments 57 Adjusted Total 8,489,069,333$ (39,340,362)$ 8,528,409,695$ 1,725,907,746$ 77,920,089$ 1,647,987,657$ IRA-7A Adjustments Direct Page 2 of 2 175 Item 10. Line No. FERC Account No. FERC Account Titles Ref Change in Gross Plant as of 12/31/22 Depreciation Rate per GUD No. 10779 Depreciation Expense Accumulated Depreciation Net Plant (a) (b) (c) (d) (e) (f) (g) (h) (i) 11 1. INTANGIBLE PLANT 12 301.00 Organization -$ 0.00% -$ -$ -$ 13 302.00 Franchises and Consents - 0.00% - - - 14 303.00 Miscellaneous Intangible Plant - 0.00% - - - 15 Subtotal -$ -$ -$ -$ 16 17 5. DISTRIBUTION PLANT 18 374.01 Land -$ 0.00% -$ -$ -$ 19 374.02 Land Rights - 0.98% - 33,774 (33,774) 20 375.00 Structures and Improvements 5,053 1.71% 86 30,146 (25,093) 21 376.00 Mains - Cathodic Protection 18,943,656 1.85% 350,458 2,869,199 16,074,457 22 376.01 Mains - Steel 56,860,201 3.97% 2,257,350 (6,468,084) 63,328,284 23 376.02 Mains - Plastic 546,456,902 2.21% 12,076,698 67,707,945 478,748,957 24 378.00 M&R Station Equipment 18,435,580 3.09% 569,659 (6,457,643) 24,893,222 25 379.00 City Gate Equipment 226,332 1.88% 4,255 127,878 98,454 26 380.00 Services 252,772,807 3.67% 9,276,762 54,584,175 198,188,632 27 381.00 Meters 22,546,207 3.31% 746,279 2,247,460 20,298,746 28 382.00 Meter Installations 54,895,958 3.66% 2,009,192 3,238,436 51,657,522 29 383.00 House Regulators (1,717,572) 3.50% (60,115) 901,258 (2,618,830) 30 385.00 Industrial M&R Station Equipment 324,185 2.80% 9,077 93,117 231,068 31 Subtotal 969,749,307$ 27,239,702$ 118,907,662$ 850,841,645$ 32 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Direct Incremental Plant IRA-8 Direct Incremental Plant Page 1 of 2 176 Item 10. Line No. FERC Account No. FERC Account Titles Ref Change in Gross Plant as of 12/31/22 Depreciation Rate per GUD No. 10779 Depreciation Expense Accumulated Depreciation Net Plant (a) (b) (c) (d) (e) (f) (g) (h) (i) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Direct Incremental Plant 33 6. GENERAL PLANT 34 389.00 Land and Land Rights (134,822)$ 0.00% -$ (2,995)$ (131,827)$ 35 390.00 Structures and Improvements 2,019,284 2.54% 51,290 (935,302) 2,954,586 36 390.04 Air Conditioning Equipment 70,565 2.75% 1,941 13,628 56,937 37 391.00 Office Furniture and Equipment (991,305) 4.00% (39,652) (740,665) (250,640) 38 392.00 Transportation Equipment (345,519) 9.04% (2,931) (148,805) (196,714) 39 393.00 Stores Equipment - 4.00% 38 5,337 (5,337) 40 394.00 Tools, Shop, and Garage Equipment 43,333 5.00% 12,600 (746,838) 790,170 41 395.00 Laboratory Equipment (344,291) 10.00% (2,751) (171,155) (173,136) 42 396.00 Power Operated Equipment - 7.24% (0) 114,739 (114,739) 43 397.00 Communication Equipment - 6.67% - 167,482 (167,482) 44 398.00 Miscellaneous Equipment 43,775 2.50% 1,094 144,986 (101,211) 45 399.00 Other Tangible Property (29,914) 14.29% (4,275) (2,376) (27,538) 46 399.01 Other Tangible Property - Servers Hardware (63,528) 14.29% - (63,528) - 47 399.02 Other Tangible Property - Servers Software (7,694) 14.29% (1,099) 26,989 (34,683) 48 399.03 Other Tangible Property - Network Hardware 241,145 11.11% 26,791 31,902 209,243 49 399.06 Other Tangible Property - PC Hardware (635,606) 14.29% (90,828) (899,970) 264,364 50 399.07 Other Tangible Property - PC Software (9,216) 14.29% (1,317) 50,178 (59,394) 51 399.08 Other Tangible Property - Application Software (203,719) 14.29% (29,111) (59,188) (144,531) 52 RWIP Retirement Work In Progress - - (1,919,563) 1,919,563 53 Subtotal (347,513)$ (78,212)$ (5,135,144)$ 4,787,631$ 54 55 TOTAL 969,401,794$ 27,161,490$ 113,772,518$ 855,629,276$ 56 Accrual for Reserve Deficiency (AR 15) - (719) - - 57 Adjusted Total 969,401,794$ 27,160,771$ 113,772,518$ 855,629,276$ IRA-8 Direct Incremental Plant Page 2 of 2 177 Item 10. Line No. FERC Account No. FERC Account Titles Ref Prior Year Adjusted Gross Plant As of 12/31/21 Depreciation Rate per GUD No. 10779 Depreciation Expense Adjusted Accumulated Depreciation As of 12/31/21 Net Plant Prior Year Allocation Factor Allocated Adjusted Gross Plant Allocated Depreciation Expense Allocated Adjusted Accumulated Depreciation Allocated Net Plant (a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) (j) (k) = (e) x (j) (l) = (g) x (j) (m) = (h) x (j) (n) = (i) x (j) 11 SSU GENERAL OFFICE (DIVISION 002) 12 6. GENERAL PLANT 13 390.00 Structures and Improvements 1,438,336$ 3.34% 48,040$ 677,168$ 761,168$ 40.26% 579,074$ 19,341$ 272,628$ 306,446$ 14 390.09 Improvements to Leased Premises 8,680,122 4.06% 352,413 8,633,608 46,514 40.26% 3,494,617 141,881 3,475,891 18,726 15 391.00 Office Furniture and Equipment 4,649,328 4.03% 187,368 2,177,759 2,471,569 40.26% 1,871,819 75,434 876,766 995,054 16 392.00 Transportation Equipment 315,397 28.96% 91,339 99,997 215,400 40.26% 126,979 36,773 40,259 86,720 17 393.00 Stores Equipment - 10.00% - - - 40.26% - - - - 18 394.00 Tools, Shop, and Garage Equipment 76,071 8.88% 6,755 53,680 22,392 40.26% 30,626 2,720 21,611 9,015 19 395.00 Laboratory Equipment - 10.00% - - - 40.26% - - - - 20 397.00 Communication Equipment 542,130 5.54% 30,034 18,841 523,289 40.26% 218,262 12,092 7,585 210,676 21 398.00 Miscellaneous Equipment 107,931 1.72% 1,856 31,860 76,071 40.26% 43,453 747 12,827 30,626 22 399.00 Other Tangible Property - 13.84% - (0) 0 40.26% - - (0) 0 23 399.01 Other Tangible Property - Servers Hardware 28,375,631 8.62% 2,445,979 1,275,448 27,100,183 40.26% 11,424,029 984,751 513,495 10,910,534 24 399.02 Other Tangible Property - Servers Software 6,489,630 8.78% 569,790 6,419,913 69,717 40.26% 2,612,725 229,397 2,584,657 28,068 25 399.03 Other Tangible Property - Network Hardware 4,284,443 8.72% 373,603 1,144,206 3,140,238 40.26% 1,724,917 150,413 460,657 1,264,260 26 399.06 Other Tangible Property - PC Hardware 2,911,008 8.78% 255,587 36,464 2,874,545 40.26% 1,171,972 102,899 14,680 1,157,292 27 399.07 Other Tangible Property - PC Software 1,178,940 6.64% 78,282 234,901 944,039 40.26% 474,641 31,516 94,571 380,070 28 399.08 Other Tangible Property - Application Software 86,493,504 6.57% 5,682,623 43,611,082 42,882,422 40.26% 34,822,285 2,287,824 17,557,821 17,264,463 29 399.09 Other Tangible Property - Mainframe Software - 6.21% - - - 40.26% - - - - 30 RWIP Retirement Work In Progress - - - - 40.26% - - - - 31 Subtotal 145,542,472$ 10,123,670$ 64,414,926$ 81,127,546$ 58,595,399$ 4,075,789$ 25,933,449$ 32,661,950$ 32 33 SSU GENERAL OFFICE - GREENVILLE DATA CENTER 34 6. GENERAL PLANT 35 390.05 Structures and Improvements 14,369,534$ 3.34% 479,942$ 4,602,018$ 9,767,516$ 14.16% 2,035,443$ 67,984$ 651,875$ 1,383,568$ 36 391.04 Office Furniture and Equipment 71,036 4.03% 2,863 41,460 29,577 14.16% 10,062 406 5,873 4,190 37 Subtotal 14,440,570$ 482,805$ 4,643,478$ 9,797,093$ 2,045,506$ 68,389$ 657,748$ 1,387,757$ 38 39 SSU GENERAL OFFICE - DISTRIBUTION AND MARKETING 40 6. GENERAL PLANT 41 390.20 Structures and Improvements 2,116$ 3.34% 71$ 239$ 1,877$ 50.74% 1,074$ 36$ 121$ 952$ 42 390.29 Improvements to Leased Premises 31,824 4.06% 1,292 3,457 28,368 50.74% 16,148 656 1,754 14,394 43 391.20 Office Furniture and Equipment 42,049 4.03% 1,695 15,364 26,685 50.74% 21,336 860 7,796 13,540 44 394.20 Tools, Shop, and Garage Equipment - 8.88% - 388 (388) 50.74% - - 197 (197) 45 397.20 Communication Equipment 8,824 5.54% 489 5,518 3,307 50.74% 4,477 248 2,800 1,678 46 398.20 Miscellaneous Equipment 7,388 1.72% 127 1,566 5,823 50.74% 3,749 64 794 2,954 47 399.21 Other Tangible Property - Servers Hardware 1,324,663 8.62% 114,186 680,618 644,044 50.74% 672,134 57,938 345,346 326,788 48 399.22 Other Tangible Property - Servers Software 5,425,529 8.78% 476,361 1,340,996 4,084,532 50.74% 2,752,913 241,706 680,422 2,072,492 49 399.23 Other Tangible Property - Network Hardware 184,214 8.72% 16,063 24,975 159,239 50.74% 93,470 8,151 12,672 80,798 50 399.26 Other Tangible Property - PC Hardware 376,232 8.78% 33,033 164,063 212,169 50.74% 190,900 16,761 83,245 107,655 51 399.28 Other Tangible Property - Application Software 27,358,036 6.57% 1,797,423 16,249,812 11,108,224 50.74% 13,881,467 912,012 8,245,155 5,636,313 52 Subtotal 34,760,875$ 2,440,740$ 18,486,995$ 16,273,880$ 17,637,668$ 1,238,432$ 9,380,301$ 8,257,366$ 53 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Initial or Prior Year Plant - SSU IRA-9 Alloc. Initial Plant Page 1 of 3 178 Item 10. Line No. FERC Account No. FERC Account Titles Ref Prior Year Adjusted Gross Plant As of 12/31/21 Depreciation Rate per GUD No. 10779 Depreciation Expense Adjusted Accumulated Depreciation As of 12/31/21 Net Plant Prior Year Allocation Factor Allocated Adjusted Gross Plant Allocated Depreciation Expense Allocated Adjusted Accumulated Depreciation Allocated Net Plant (a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) (j) (k) = (e) x (j) (l) = (g) x (j) (m) = (h) x (j) (n) = (i) x (j) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Initial or Prior Year Plant - SSU 54 SSU GENERAL OFFICE - ALIGNE PIPE PROJECTS 55 6. GENERAL PLANT 56 399.31 Other Tangible Property - Servers Hardware 297,267$ 8.62% 25,624$ 152,366$ 144,900$ 5.89% 17,520$ 1,510$ 8,980$ 8,540$ 57 399.32 Other Tangible Property - Servers Software 783,917 8.78% 68,828 226,050 557,867 5.89% 46,202 4,056 13,323 32,879 58 399.38 Other Tangible Property - Application Software 21,102,100 6.57% 1,386,408 7,944,327 13,157,773 5.89% 1,243,692 81,711 468,214 775,478 59 Subtotal 22,183,283$ 1,480,860$ 8,322,743$ 13,860,540$ 1,307,413$ 87,277$ 490,516$ 816,897$ 60 61 TOTAL SSU GENERAL OFFICE 216,927,201$ 14,528,075$ 95,868,142$ 121,059,059$ 79,585,986$ 5,469,888$ 36,462,015$ 43,123,971$ 62 63 SSU CUSTOMER SUPPORT (DIVISION 012) 64 6. GENERAL PLANT 65 389.00 Land and Land Rights 2,874,240$ 0.00% -$ -$ 2,874,240$ 52.74% 1,515,874$ -$ -$ 1,515,874$ 66 390.00 Structures and Improvements 13,511,944 3.34% 451,299 3,284,175 10,227,769 52.74% 7,126,199 238,015 1,732,074 5,394,125 67 390.09 Improvements to Leased Premises 2,812,746 4.06% 114,197 2,029,757 782,988 52.74% 1,483,442 60,228 1,070,494 412,948 68 391.00 Office Furniture and Equipment 2,670,623 4.03% 107,626 1,175,986 1,494,637 52.74% 1,408,487 56,762 620,215 788,271 69 397.00 Communication Equipment 1,913,117 5.54% 105,987 1,411,629 501,488 52.74% 1,008,978 55,897 744,493 264,485 70 398.00 Miscellaneous Equipment 57,552 1.72% 990 15,051 42,501 52.74% 30,353 522 7,938 22,415 71 399.00 Other Tangible Property - 13.84% - (154,265) 154,265 52.74% - - (81,359) 81,359 72 399.01 Other Tangible Property - Servers Hardware 9,983,514 8.62% 860,579 6,845,518 3,137,996 52.74% 5,265,305 453,869 3,610,326 1,654,979 73 399.02 Other Tangible Property - Servers Software 2,208,691 8.78% 193,923 1,810,871 397,820 52.74% 1,164,864 102,275 955,054 209,810 74 399.03 Other Tangible Property - Network Hardware 720,084 8.72% 62,791 151,497 568,587 52.74% 379,772 33,116 79,899 299,873 75 399.06 Other Tangible Property - PC Hardware 792,277 8.78% 69,562 (138,408) 930,685 52.74% 417,847 36,687 (72,996) 490,843 76 399.07 Other Tangible Property - PC Software - 6.64% - (57,199) 57,199 52.74% - - (30,167) 30,167 77 399.08 Other Tangible Property - Application Software 98,075,501 6.57% 6,443,560 50,484,701 47,590,800 52.74% 51,725,019 3,398,334 26,625,631 25,099,388 78 Subtotal 135,620,290$ 8,410,515$ 66,859,314$ 68,760,975$ 71,526,141$ 4,435,706$ 35,261,602$ 36,264,538$ 79 IRA-9 Alloc. Initial Plant Page 2 of 3 179 Item 10. Line No. FERC Account No. FERC Account Titles Ref Prior Year Adjusted Gross Plant As of 12/31/21 Depreciation Rate per GUD No. 10779 Depreciation Expense Adjusted Accumulated Depreciation As of 12/31/21 Net Plant Prior Year Allocation Factor Allocated Adjusted Gross Plant Allocated Depreciation Expense Allocated Adjusted Accumulated Depreciation Allocated Net Plant (a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) (j) (k) = (e) x (j) (l) = (g) x (j) (m) = (h) x (j) (n) = (i) x (j) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Initial or Prior Year Plant - SSU 80 SSU CUSTOMER SUPPORT - CHARLES K. VAUGHN TRAINING CENTER 81 6. GENERAL PLANT 82 389.10 Land and Land Rights 1,886,443$ 0.00% -$ -$ 1,886,443$ 75.72% 1,428,362$ -$ -$ 1,428,362$ 83 390.10 Structures and Improvements 12,586,758 3.34% 420,398 4,195,862 8,390,896 75.72% 9,530,340 318,313 3,176,989 6,353,351 84 391.10 Office Furniture and Equipment 565,504 4.03% 22,790 114,184 451,320 75.72% 428,184 17,256 86,457 341,727 85 392.10 Transportation Equipment 96,290 28.96% 27,886 96,252 38 75.72% 72,908 21,114 72,880 29 86 394.10 Tools, Shop, and Garage Equipment 595,558 8.88% 52,886 248,835 346,722 75.72% 450,940 40,043 188,411 262,528 87 395.10 Laboratory Equipment 23,632 10.00% 2,363 23,264 368 75.72% 17,894 1,789 17,615 278 88 397.10 Communication Equipment 345,956 5.54% 19,166 213,292 132,664 75.72% 261,948 14,512 161,499 100,449 89 398.10 Miscellaneous Equipment 537,587 1.72% 9,246 170,234 367,353 75.72% 407,046 7,001 128,896 278,150 90 399.10 Other Tangible Property 299,459 13.84% 41,445 215,904 83,555 75.72% 226,742 31,381 163,477 63,265 91 399.16 Other Tangible Property - PC Hardware 72,357 8.78% 6,353 53,851 18,505 75.72% 54,786 4,810 40,775 14,012 92 399.17 Other Tangible Property - PC Software 3,299 6.64% 219 (27,625) 30,924 75.72% 2,498 166 (20,917) 23,414 93 399.18 Other Tangible Property - Application Software - 15.89% - (9,966) 9,966 75.72% - - (7,546) 7,546 94 Subtotal 17,012,843$ 602,751$ 5,294,088$ 11,718,754$ 12,881,648$ 456,387$ 4,008,535$ 8,873,112$ 95 96 TOTAL SSU CUSTOMER SUPPORT 152,633,132$ 9,013,266$ 72,153,403$ 80,479,730$ 84,407,788$ 4,892,092$ 39,270,138$ 45,137,651$ 97 98 TOTAL SSU GENERAL OFFICE AND CUSTOMER SUPPORT 369,560,333$ 23,541,342$ 168,021,544$ 201,538,789$ 163,993,774$ 10,361,980$ 75,732,153$ 88,261,622$ 99 100 Miscellaneous Adjustments 1- - 897,009 (897,009) 40.26% - - 361,136 (361,136) 101 Adjusted Total 369,560,333$ 23,541,342$ 168,918,553$ 200,641,780$ 163,993,774$ 10,361,980$ 76,093,289$ 87,900,486$ 102 103 Note: 104 1. The Miscellaneous Adjustment (Line 100) relates to a reclass of depreciation and amortization expense resulting from a Willis Towers Watson adjustment identified for the years 2018 through 2021. Amortization began in November 2021 and will continue for 5 years. IRA-9 Alloc. Initial Plant Page 3 of 3 180 Item 10. Line No. FERC Account No. FERC Account Titles Ref Adjusted Gross Plant As of 12/31/22 Depreciation Rate Per GUD No. 10779 Depreciation Expense Adjusted Accumulated Depreciation As of 12/31/22 Net Plant Current Year Allocation Factor Allocated Adjusted Gross Plant Allocated Depreciation Expense Allocated Adjusted Accumulated Depreciation Allocated Net Plant (a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) (j) (k) = (e) x (j) (l) = (g) x (j) (m) = (h) x (j) (n) = (i) x (j) 11 SSU GENERAL OFFICE (DIVISION 002) 12 6. GENERAL PLANT 13 390.00 Structures and Improvements 1,438,336$ 3.34% 48,040$ 726,410$ 711,926$ 40.09% 576,629$ 19,259$ 291,218$ 285,411$ 14 390.09 Improvements to Leased Premises 8,657,204 4.06% 351,482 8,649,166 8,038 40.09% 3,470,673 140,909 3,467,451 3,222 15 391.00 Office Furniture and Equipment 4,755,212 4.03% 191,635 2,384,099 2,371,114 40.09% 1,906,365 76,826 955,785 950,580 16 392.00 Transportation Equipment 315,397 28.96% 91,339 153,576 161,822 40.09% 126,443 36,618 61,568 64,874 17 393.00 Stores Equipment - 10.00% - - - 40.09% - - - - 18 394.00 Tools, Shop, and Garage Equipment 76,071 8.88% 6,755 60,393 15,679 40.09% 30,497 2,708 24,211 6,286 19 395.00 Laboratory Equipment - 10.00% - - - 40.09% - - - - 20 397.00 Communication Equipment 386,282 5.54% 21,400 42,105 344,176 40.09% 154,860 8,579 16,880 137,980 21 398.00 Miscellaneous Equipment 107,931 1.72% 1,856 36,024 71,907 40.09% 43,270 744 14,442 28,828 22 399.00 Other Tangible Property - 13.84% - (0) 0 40.09% - - (0) 0 23 399.01 Other Tangible Property - Servers Hardware 36,095,200 8.62% 3,111,406 4,509,421 31,585,778 40.09% 14,470,565 1,247,363 1,807,827 12,662,739 24 399.02 Other Tangible Property - Servers Software 6,594,516 8.78% 578,999 6,557,522 36,994 40.09% 2,643,742 232,121 2,628,911 14,831 25 399.03 Other Tangible Property - Network Hardware 4,425,992 8.72% 385,946 1,507,406 2,918,586 40.09% 1,774,380 154,726 604,319 1,170,061 26 399.06 Other Tangible Property - PC Hardware 3,651,922 8.78% 320,639 410,698 3,241,224 40.09% 1,464,055 128,544 164,649 1,299,407 27 399.07 Other Tangible Property - PC Software 87,226 6.64% 5,792 52,371 34,855 40.09% 34,969 2,322 20,996 13,973 28 399.08 Other Tangible Property - Application Software 91,436,180 6.57% 6,007,357 49,789,305 41,646,875 40.09% 36,656,764 2,408,349 19,960,532 16,696,232 29 399.09 Other Tangible Property - Mainframe Software - 6.21% - - - 40.09% - - - - 30 RWIP Retirement Work In Progress - - - - 40.09% - - - - 31 Subtotal 158,027,469$ 11,122,647$ 74,878,495$ 83,148,973$ 63,353,212$ 4,459,069$ 30,018,789$ 33,334,423$ 32 33 SSU GENERAL OFFICE - GREENVILLE DATA CENTER 34 6. GENERAL PLANT 35 390.05 Structures and Improvements 14,064,998$ 3.34% 469,771$ 4,983,831$ 9,081,167$ 14.18% 1,994,245$ 66,608$ 706,646$ 1,287,599$ 36 391.04 Office Furniture and Equipment 82,909 4.03% 3,341 44,747 38,162 14.18% 11,756 474 6,345 5,411 37 Subtotal 14,147,907$ 473,112$ 5,028,577$ 9,119,329$ 2,006,001$ 67,082$ 712,991$ 1,293,010$ 38 39 SSU GENERAL OFFICE - DISTRIBUTION AND MARKETING 40 6. GENERAL PLANT 41 390.20 Structures and Improvements 24,633$ 3.34% 823$ 570$ 24,063$ 51.13% 12,595$ 421$ 291$ 12,304$ 42 390.29 Improvements to Leased Premises 54,743 4.06% 2,223 11,120 43,623 51.13% 27,990 1,136 5,686 22,304 43 391.20 Office Furniture and Equipment 65,827 4.03% 2,653 17,952 47,875 51.13% 33,657 1,356 9,179 24,479 44 394.20 Tools, Shop, and Garage Equipment - 8.88% - 388 (388) 51.13% - - 198 (198) 45 397.20 Communication Equipment 8,824 5.54% 489 6,030 2,794 51.13% 4,512 250 3,083 1,429 46 398.20 Miscellaneous Equipment 7,388 1.72% 127 1,802 5,586 51.13% 3,778 65 921 2,856 47 399.21 Other Tangible Property - Servers Hardware 1,375,924 8.62% 118,605 812,250 563,674 51.13% 703,510 60,643 415,303 288,207 48 399.22 Other Tangible Property - Servers Software 5,425,529 8.78% 476,361 1,835,463 3,590,066 51.13% 2,774,073 243,564 938,472 1,835,601 49 399.23 Other Tangible Property - Network Hardware 194,180 8.72% 16,933 41,810 152,370 51.13% 99,284 8,658 21,377 77,907 50 399.26 Other Tangible Property - PC Hardware 385,133 8.78% 33,815 205,141 179,992 51.13% 196,918 17,289 104,889 92,030 51 399.28 Other Tangible Property - Application Software 28,045,958 6.57% 1,842,619 18,147,198 9,898,760 51.13% 14,339,898 942,131 9,278,662 5,061,236 52 Subtotal 35,588,140$ 2,494,647$ 21,079,723$ 14,508,417$ 18,196,216$ 1,275,513$ 10,778,062$ 7,418,153$ 53 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Current Year Plant (Adjusted) - SSU IRA-10 Alloc. Current Plant Page 1 of 3 181 Item 10. Line No. FERC Account No. FERC Account Titles Ref Adjusted Gross Plant As of 12/31/22 Depreciation Rate Per GUD No. 10779 Depreciation Expense Adjusted Accumulated Depreciation As of 12/31/22 Net Plant Current Year Allocation Factor Allocated Adjusted Gross Plant Allocated Depreciation Expense Allocated Adjusted Accumulated Depreciation Allocated Net Plant (a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) (j) (k) = (e) x (j) (l) = (g) x (j) (m) = (h) x (j) (n) = (i) x (j) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Current Year Plant (Adjusted) - SSU 54 SSU GENERAL OFFICE - ALIGNE PIPE PROJECTS 55 6. GENERAL PLANT 56 399.31 Other Tangible Property - Servers Hardware 297,267$ 8.62% 25,624$ 180,590$ 116,677$ 6.13% 18,237$ 1,572$ 11,079$ 7,158$ 57 399.32 Other Tangible Property - Servers Software 783,917 8.78% 68,828 297,033 486,883 6.13% 48,092 4,222 18,222 29,869 58 399.38 Other Tangible Property - Application Software 21,123,037 6.57% 1,387,784 9,316,859 11,806,178 6.13% 1,295,860 85,138 571,572 724,287 59 Subtotal 22,204,220$ 1,482,236$ 9,794,482$ 12,409,738$ 1,362,188$ 90,932$ 600,873$ 761,315$ 60 61 TOTAL SSU GENERAL OFFICE 229,967,735$ 15,572,642$ 110,781,278$ 119,186,457$ 84,917,617$ 5,892,596$ 42,110,716$ 42,806,901$ 62 63 SSU CUSTOMER SUPPORT (DIVISION 012) 64 6. GENERAL PLANT 65 389.00 Land and Land Rights 2,874,240$ 0.00% -$ -$ 2,874,240$ 53.00% 1,523,347$ -$ -$ 1,523,347$ 66 390.00 Structures and Improvements 13,511,944 3.34% 451,299 3,701,500 9,810,444 53.00% 7,161,330 239,188 1,961,795 5,199,535 67 390.09 Improvements to Leased Premises 3,003,620 4.06% 121,947 2,151,653 851,968 53.00% 1,591,919 64,632 1,140,376 451,543 68 391.00 Office Furniture and Equipment 2,670,623 4.03% 107,626 1,296,498 1,374,125 53.00% 1,415,430 57,042 687,144 728,286 69 397.00 Communication Equipment 1,913,117 5.54% 105,987 1,522,530 390,587 53.00% 1,013,952 56,173 806,941 207,011 70 398.00 Miscellaneous Equipment 71,627 1.72% 1,232 17,235 54,392 53.00% 37,962 653 9,135 28,828 71 399.00 Other Tangible Property - 13.84% - (154,265) 154,265 53.00% - - (81,760) 81,760 72 399.01 Other Tangible Property - Servers Hardware 12,194,175 8.62% 1,051,138 7,959,124 4,235,051 53.00% 6,462,913 557,103 4,218,336 2,244,577 73 399.02 Other Tangible Property - Servers Software 2,208,691 8.78% 193,923 2,011,313 197,378 53.00% 1,170,606 102,779 1,065,996 104,610 74 399.03 Other Tangible Property - Network Hardware 721,114 8.72% 62,881 205,244 515,870 53.00% 382,190 33,327 108,779 273,411 75 399.06 Other Tangible Property - PC Hardware 858,992 8.78% 75,420 (47,887) 906,879 53.00% 455,266 39,972 (25,380) 480,646 76 399.07 Other Tangible Property - PC Software - 6.64% - (57,199) 57,199 53.00% - - (30,316) 30,316 77 399.08 Other Tangible Property - Application Software 102,030,507 6.57% 6,703,404 57,252,343 44,778,164 53.00% 54,076,169 3,552,804 30,343,742 23,732,427 78 Subtotal 142,058,651$ 8,874,857$ 75,858,088$ 66,200,563$ 75,291,085$ 4,703,674$ 40,204,787$ 35,086,298$ 79 IRA-10 Alloc. Current Plant Page 2 of 3 182 Item 10. Line No. FERC Account No. FERC Account Titles Ref Adjusted Gross Plant As of 12/31/22 Depreciation Rate Per GUD No. 10779 Depreciation Expense Adjusted Accumulated Depreciation As of 12/31/22 Net Plant Current Year Allocation Factor Allocated Adjusted Gross Plant Allocated Depreciation Expense Allocated Adjusted Accumulated Depreciation Allocated Net Plant (a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) (j) (k) = (e) x (j) (l) = (g) x (j) (m) = (h) x (j) (n) = (i) x (j) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Current Year Plant (Adjusted) - SSU 80 SSU CUSTOMER SUPPORT - CHARLES K. VAUGHN TRAINING CENTER 81 6. GENERAL PLANT 82 389.10 Land and Land Rights 1,886,443$ 0.00% -$ -$ 1,886,443$ 71.83% 1,354,940$ -$ -$ 1,354,940$ 83 390.10 Structures and Improvements 12,586,758 3.34% 420,398 4,598,574 7,988,184 71.83% 9,040,457 301,951 3,302,932 5,737,525 84 391.10 Office Furniture and Equipment 606,777 4.03% 24,453 91,120 515,656 71.83% 435,818 17,563 65,447 370,371 85 392.10 Transportation Equipment 96,290 28.96% - 96,644 (353) 71.83% 69,161 - 69,414 (254) 86 394.10 Tools, Shop, and Garage Equipment 641,147 8.88% 56,934 307,268 333,879 71.83% 460,505 40,893 220,696 239,809 87 395.10 Laboratory Equipment - 10.00% - 125 (125) 71.83% - - 90 (90) 88 397.10 Communication Equipment 86,046 5.54% 4,767 (56,803) 142,849 71.83% 61,803 3,424 (40,799) 102,602 89 398.10 Miscellaneous Equipment 537,587 1.72% 9,246 183,896 353,692 71.83% 386,123 6,641 132,083 254,040 90 399.10 Other Tangible Property 158,990 13.84% 22,004 116,138 42,853 71.83% 114,195 15,805 83,416 30,779 91 399.16 Other Tangible Property - PC Hardware 116,342 8.78% 10,215 52,951 63,391 71.83% 83,563 7,337 38,032 45,531 92 399.17 Other Tangible Property - PC Software 3,299 6.64% 219 (27,392) 30,691 71.83% 2,370 157 (19,674) 22,044 93 399.18 Other Tangible Property - Application Software - 15.89% - (9,966) 9,966 71.83% - - (7,158) 7,158 94 Subtotal 16,719,680$ 548,236$ 5,352,554$ 11,367,126$ 12,008,935$ 393,772$ 3,844,480$ 8,164,455$ 95 96 TOTAL SSU CUSTOMER SUPPORT 158,778,331$ 9,423,093$ 81,210,642$ 77,567,689$ 87,300,020$ 5,097,446$ 44,049,266$ 43,250,753$ 97 98 TOTAL SSU GENERAL OFFICE AND CUSTOMER SUPPORT 388,746,066$ 24,995,735$ 191,991,920$ 196,754,146$ 172,217,636$ 10,990,042$ 86,159,982$ 86,057,654$ 99 100 Miscellaneous Adjustments - Division 002 1- - 711,421 (711,421) 40.09% - - 285,209 (285,209) 101 Adjusted Total 388,746,066$ 24,995,735$ 192,703,340$ 196,042,725$ 172,217,636$ 10,990,042$ 86,445,190$ 85,772,446$ 102 103 Note: 104 1. The Miscellaneous Adjustment (Line 100) relates to a reclass of depreciation and amortization expense resulting from a Willis Towers Watson adjustment identified for the years 2018 through 2021. Amortization began in November 2021 and will continue for 5 years. IRA-10 Alloc. Current Plant Page 3 of 3 183 Item 10. Line No. FERC Account No. FERC Account Titles Ref Per Book Gross Plant As of 12/31/22 Plant Adjustments Adjusted Gross Plant as of 12/31/22 Per Book Accumulated Depreciation As of 12/31/22 Accumulated Depreciation Adjustments Adjusted Accumulated Depreciation as of 12/31/22 Current Year Allocation Factor Allocated Gross Plant as of 12/31/22 Allocated Gross Plant Adjustments Allocated Accumulated Depreciation as of 12/31/22 Allocated Accumulated Depreciation Adjustments (a) (b) (c) (d) (e) (f) (g) = (e) - (f) (h) (i) (j) = (h) - (i) (k) (l) = (e) * (k) (m) = (f) * (k) (n) = (h) * (k) (o) = (i) * (k) 11 SSU GENERAL OFFICE (DIVISION 002) 12 6. GENERAL PLANT 13 390.00 Structures and Improvements 5,928,124$ 4,489,788$ 1,438,336$ 1,030,338$ 303,928$ 726,410$ 40.09% 2,376,585$ 1,799,956$ 413,063$ 121,845$ 14 390.09 Improvements to Leased Premises 9,896,645 1,239,442 8,657,204 9,834,573 1,185,407 8,649,166 40.09% 3,967,565 496,892 3,942,680 475,230 15 391.00 Office Furniture and Equipment 6,203,949 1,448,736 4,755,212 2,932,855 548,756 2,384,099 40.09% 2,487,163 580,798 1,175,781 219,996 16 392.00 Transportation Equipment 315,397 - 315,397 153,576 - 153,576 40.09% 126,443 - 61,568 - 17 393.00 Stores Equipment - - - - - - 40.09% - - - - 18 394.00 Tools, Shop, and Garage Equipment 76,071 - 76,071 60,393 - 60,393 40.09% 30,497 - 24,211 - 19 395.00 Laboratory Equipment - - - - - - 40.09% - - - - 20 397.00 Communication Equipment 543,959 157,678 386,282 50,180 8,075 42,105 40.09% 218,073 63,213 20,117 3,237 21 398.00 Miscellaneous Equipment 107,931 - 107,931 36,024 - 36,024 40.09% 43,270 - 14,442 - 22 399.00 Other Tangible Property - - - (0) - (0) 40.09% - - (0) - 23 399.01 Other Tangible Property - Servers Hardware 36,146,461 51,262 36,095,200 4,514,019 4,598 4,509,421 40.09% 14,491,116 20,551 1,809,670 1,843 24 399.02 Other Tangible Property - Servers Software 6,594,516 - 6,594,516 6,557,522 - 6,557,522 40.09% 2,643,742 - 2,628,911 - 25 399.03 Other Tangible Property - Network Hardware 4,435,958 9,966 4,425,992 1,507,862 456 1,507,406 40.09% 1,778,375 3,995 604,502 183 26 399.06 Other Tangible Property - PC Hardware 3,660,823 8,901 3,651,922 411,164 466 410,698 40.09% 1,467,624 3,568 164,836 187 27 399.07 Other Tangible Property - PC Software 87,226 - 87,226 52,371 - 52,371 40.09% 34,969 - 20,996 - 28 399.08 Other Tangible Property - Application Software 92,124,108 687,928 91,436,180 49,851,724 62,419 49,789,305 40.09% 36,932,555 275,790 19,985,556 25,024 29 399.09 Other Tangible Property - Mainframe Software - - - - - - 40.09% - - - - 30 RWIP Retirement Work In Progress - - - - - - 40.09% - - - - 31 Subtotal 166,121,169$ 8,093,700$ 158,027,469$ 76,992,600$ 2,114,104$ 74,878,495$ 66,597,977$ 3,244,765$ 30,866,333$ 847,544$ 32 33 SSU GENERAL OFFICE - GREENVILLE DATA CENTER 34 6. GENERAL PLANT 35 390.05 Structures and Improvements 14,064,998$ -$ 14,064,998$ 4,983,831$ -$ 4,983,831$ 14.18% 1,994,245$ -$ 706,646$ -$ 36 391.04 Office Furniture and Equipment 82,909 - 82,909 44,747 - 44,747 14.18% 11,756 - 6,345 - 37 Subtotal 14,147,907$ -$ 14,147,907$ 5,028,577$ -$ 5,028,577$ 2,006,001$ -$ 712,991$ -$ 38 39 SSU GENERAL OFFICE - DISTRIBUTION AND MARKETING 40 6. GENERAL PLANT 41 390.20 Structures and Improvements 2,116$ (22,517)$ 24,633$ 305$ (265)$ 570$ 51.13% 1,082$ (11,513)$ 156$ (135)$ 42 390.29 Improvements to Leased Premises 31,824 (22,919) 54,743 4,793 (6,327) 11,120 51.13% 16,272 (11,718) 2,451 (3,235) 43 391.20 Office Furniture and Equipment 263,338 197,511 65,827 151,383 133,431 17,952 51.13% 134,645 100,987 77,402 68,223 44 394.20 Tools, Shop, and Garage Equipment - - - 388 - 388 51.13% - - 198 - 45 397.20 Communication Equipment 8,824 - 8,824 6,030 - 6,030 51.13% 4,512 - 3,083 - 46 398.20 Miscellaneous Equipment 7,388 - 7,388 1,802 - 1,802 51.13% 3,778 - 921 - 47 399.21 Other Tangible Property - Servers Hardware 1,324,663 (51,262) 1,375,924 807,652 (4,598) 812,250 51.13% 677,300 (26,210) 412,952 (2,351) 48 399.22 Other Tangible Property - Servers Software 5,425,529 - 5,425,529 1,835,463 - 1,835,463 51.13% 2,774,073 - 938,472 - 49 399.23 Other Tangible Property - Network Hardware 184,214 (9,966) 194,180 41,354 (456) 41,810 51.13% 94,189 (5,096) 21,144 (233) 50 399.26 Other Tangible Property - PC Hardware 376,232 (8,901) 385,133 204,675 (466) 205,141 51.13% 192,367 (4,551) 104,650 (238) 51 399.28 Other Tangible Property - Application Software 27,358,036 (687,922) 28,045,958 18,084,782 (62,416) 18,147,198 51.13% 13,988,164 (351,735) 9,246,749 (31,913) 52 Subtotal 34,982,164$ (605,976)$ 35,588,140$ 21,138,627$ 58,904$ 21,079,723$ 17,886,380$ (309,835)$ 10,808,180$ 30,117$ 53 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Current Year Plant Adjustments - SSU IRA-10A Adjustments Alloc Page 1 of 3 184 Item 10. Line No. FERC Account No. FERC Account Titles Ref Per Book Gross Plant As of 12/31/22 Plant Adjustments Adjusted Gross Plant as of 12/31/22 Per Book Accumulated Depreciation As of 12/31/22 Accumulated Depreciation Adjustments Adjusted Accumulated Depreciation as of 12/31/22 Current Year Allocation Factor Allocated Gross Plant as of 12/31/22 Allocated Gross Plant Adjustments Allocated Accumulated Depreciation as of 12/31/22 Allocated Accumulated Depreciation Adjustments (a) (b) (c) (d) (e) (f) (g) = (e) - (f) (h) (i) (j) = (h) - (i) (k) (l) = (e) * (k) (m) = (f) * (k) (n) = (h) * (k) (o) = (i) * (k) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Current Year Plant Adjustments - SSU 54 SSU GENERAL OFFICE - ALIGNE PIPE PROJECTS 55 6. GENERAL PLANT 56 399.31 Other Tangible Property - Servers Hardware 297,267$ -$ 297,267$ 180,590$ -$ 180,590$ 6.13% 18,237$ -$ 11,079$ -$ 57 399.32 Other Tangible Property - Servers Software 783,917 - 783,917 297,033 - 297,033 6.13% 48,092 - 18,222 - 58 399.38 Other Tangible Property - Application Software 21,123,037 - 21,123,037 9,316,859 - 9,316,859 6.13% 1,295,860 - 571,572 - 59 Subtotal 22,204,220$ -$ 22,204,220$ 9,794,482$ -$ 9,794,482$ 1,362,188$ -$ 600,873$ -$ 60 61 TOTAL SSU GENERAL OFFICE 237,455,460$ 7,487,725$ 229,967,735$ 112,954,286$ 2,173,008$ 110,781,278$ 87,852,546$ 2,934,929$ 42,988,377$ 877,662$ 62 63 SSU CUSTOMER SUPPORT (DIVISION 012) 64 6. GENERAL PLANT 65 389.00 Land and Land Rights 2,874,240$ -$ 2,874,240$ -$ -$ -$ 53.00% 1,523,347$ -$ -$ -$ 66 390.00 Structures and Improvements 13,511,944 - 13,511,944 3,701,500 - 3,701,500 53.00% 7,161,330 - 1,961,795 - 67 390.09 Improvements to Leased Premises 3,011,488 7,868 3,003,620 2,156,389 4,736 2,151,653 53.00% 1,596,089 4,170 1,142,886 2,510 68 391.00 Office Furniture and Equipment 2,710,774 40,151 2,670,623 1,315,867 19,370 1,296,498 53.00% 1,436,710 21,280 697,410 10,266 69 397.00 Communication Equipment 1,913,117 - 1,913,117 1,522,530 - 1,522,530 53.00% 1,013,952 - 806,941 - 70 398.00 Miscellaneous Equipment 85,451 13,825 71,627 21,588 4,353 17,235 53.00% 45,289 7,327 11,442 2,307 71 399.00 Other Tangible Property - - - (154,265) - (154,265) 53.00% - - (81,760) - 72 399.01 Other Tangible Property - Servers Hardware 12,194,175 - 12,194,175 7,959,124 - 7,959,124 53.00% 6,462,913 - 4,218,336 - 73 399.02 Other Tangible Property - Servers Software 2,208,691 - 2,208,691 2,011,313 - 2,011,313 53.00% 1,170,606 - 1,065,996 - 74 399.03 Other Tangible Property - Network Hardware 721,114 - 721,114 205,244 - 205,244 53.00% 382,190 - 108,779 - 75 399.06 Other Tangible Property - PC Hardware 858,992 - 858,992 (47,887) - (47,887) 53.00% 455,266 - (25,380) - 76 399.07 Other Tangible Property - PC Software - - - (57,199) - (57,199) 53.00% - - (30,316) - 77 399.08 Other Tangible Property - Application Software 102,030,507 - 102,030,507 57,252,343 - 57,252,343 53.00% 54,076,169 - 30,343,742 - 78 Subtotal 142,120,494$ 61,843$ 142,058,651$ 75,886,547$ 28,459$ 75,858,088$ 75,323,862$ 32,777$ 40,219,870$ 15,083$ 79 IRA-10A Adjustments Alloc Page 2 of 3 185 Item 10. Line No. FERC Account No. FERC Account Titles Ref Per Book Gross Plant As of 12/31/22 Plant Adjustments Adjusted Gross Plant as of 12/31/22 Per Book Accumulated Depreciation As of 12/31/22 Accumulated Depreciation Adjustments Adjusted Accumulated Depreciation as of 12/31/22 Current Year Allocation Factor Allocated Gross Plant as of 12/31/22 Allocated Gross Plant Adjustments Allocated Accumulated Depreciation as of 12/31/22 Allocated Accumulated Depreciation Adjustments (a) (b) (c) (d) (e) (f) (g) = (e) - (f) (h) (i) (j) = (h) - (i) (k) (l) = (e) * (k) (m) = (f) * (k) (n) = (h) * (k) (o) = (i) * (k) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Current Year Plant Adjustments - SSU 80 SSU CUSTOMER SUPPORT - CHARLES K. VAUGHN TRAINING CENTER 81 6. GENERAL PLANT 82 389.10 Land and Land Rights 1,886,443$ -$ 1,886,443$ -$ -$ -$ 71.83% 1,354,940$ -$ -$ -$ 83 390.10 Structures and Improvements 12,586,758 - 12,586,758 4,598,574 - 4,598,574 71.83% 9,040,457 - 3,302,932 - 84 391.10 Office Furniture and Equipment 606,777 - 606,777 91,120 - 91,120 71.83% 435,818 - 65,447 - 85 392.10 Transportation Equipment 96,290 - 96,290 96,644 - 96,644 71.83% 69,161 - 69,414 - 86 394.10 Tools, Shop, and Garage Equipment 641,147 - 641,147 307,268 - 307,268 71.83% 460,505 - 220,696 - 87 395.10 Laboratory Equipment - - - 125 - 125 71.83% - - 90 - 88 397.10 Communication Equipment 86,046 - 86,046 (56,803) - (56,803) 71.83% 61,803 - (40,799) - 89 398.10 Miscellaneous Equipment 537,587 - 537,587 183,896 - 183,896 71.83% 386,123 - 132,083 - 90 399.10 Other Tangible Property 158,990 - 158,990 116,138 - 116,138 71.83% 114,195 - 83,416 - 91 399.16 Other Tangible Property - PC Hardware 116,342 - 116,342 52,951 - 52,951 71.83% 83,563 - 38,032 - 92 399.17 Other Tangible Property - PC Software 3,299 - 3,299 (27,392) - (27,392) 71.83% 2,370 - (19,674) - 93 399.18 Other Tangible Property - Application Software - - - (9,966) - (9,966) 71.83% - - (7,158) - 94 Subtotal 16,719,680$ -$ 16,719,680$ 5,352,554$ -$ 5,352,554$ 12,008,935$ -$ 3,844,480$ -$ 95 96 TOTAL SSU CUSTOMER SUPPORT 158,840,174$ 61,843$ 158,778,331$ 81,239,101$ 28,459$ 81,210,642$ 87,332,797$ 32,777$ 44,064,350$ 15,083$ 97 98 TOTAL SSU GENERAL OFFICE AND CUSTOMER SUPPORT 396,295,634$ 7,549,568$ 388,746,066$ 194,193,387$ 2,201,467$ 191,991,920$ 175,185,343$ 2,967,706$ 87,052,727$ 892,745$ 99 100 Miscellaneous Adjustments - Division 002 1- - - 711,421 - 711,421 40.09% - - 285,209 - 101 Adjusted Total 396,295,634$ 7,549,568$ 388,746,066$ 194,904,807$ 2,201,467$ 192,703,340$ 175,185,343$ 2,967,706$ 87,337,936$ 892,745$ 102 103 Note: 104 1. The Miscellaneous Adjustment (Line 100) relates to a reclass of depreciation and amortization expense resulting from a Willis Towers Watson adjustment identified for the years 2018 through 2021. Amortization began in November 2021 and will continue for 5 years. IRA-10A Adjustments Alloc Page 3 of 3 186 Item 10. Line No. FERC Account No. FERC Account Titles Ref Change in Gross Plant as of 12/31/22 Depreciation Rate per GUD No. 10779 Depreciation Expense Accumulated Depreciation Net Plant (1) Allocated Gross Plant Allocated Depreciation Expense Allocated Accumulated Depreciation Allocated Net Plant (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) 11 SSU GENERAL OFFICE (DIVISION 002) 12 6. GENERAL PLANT 13 390.00 Structures and Improvements -$ 3.34% -$ 49,242$ (49,242)$ (2,445)$ (82)$ 18,590$ (21,035)$ 14 390.09 Improvements to Leased Premises (22,919) 4.06% (930) 15,558 (38,476) (23,944) (972) (8,440) (15,504) 15 391.00 Office Furniture and Equipment 105,885 4.03% 4,267 206,340 (100,455) 34,545 1,392 79,019 (44,474) 16 392.00 Transportation Equipment - 28.96% - 53,578 (53,578) (536) (155) 21,310 (21,846) 17 393.00 Stores Equipment - 10.00% - - - - - - - 18 394.00 Tools, Shop, and Garage Equipment - 8.88% - 6,713 (6,713) (129) (11) 2,600 (2,729) 19 395.00 Laboratory Equipment - 10.00% - - - - - - - 20 397.00 Communication Equipment (155,848) 5.54% (8,634) 23,264 (179,113) (63,401) (3,512) 9,295 (72,696) 21 398.00 Miscellaneous Equipment - 1.72% - 4,164 (4,164) (183) (3) 1,615 (1,799) 22 399.00 Other Tangible Property - 13.84% - - - - - 0 (0) 23 399.01 Other Tangible Property - Servers Hardware 7,719,568 8.62% 665,427 3,233,973 4,485,595 3,046,536 262,611 1,294,332 1,752,205 24 399.02 Other Tangible Property - Servers Software 104,886 8.78% 9,209 137,609 (32,722) 31,017 2,723 44,253 (13,237) 25 399.03 Other Tangible Property - Network Hardware 141,548 8.72% 12,343 363,200 (221,652) 49,463 4,313 143,662 (94,199) 26 399.06 Other Tangible Property - PC Hardware 740,913 8.78% 65,052 374,235 366,679 292,083 25,645 149,969 142,115 27 399.07 Other Tangible Property - PC Software (1,091,713) 6.64% (72,490) (182,530) (909,183) (439,672) (29,194) (73,576) (366,097) 28 399.08 Other Tangible Property - Application Software 4,942,676 6.57% 324,734 6,178,223 (1,235,548) 1,834,480 120,525 2,402,711 (568,231) 29 399.09 Other Tangible Property - Mainframe Software - 6.21% - - - - - - - 30 RWIP Retirement Work In Progress - - - - - - - - 31 Subtotal 12,484,996$ 998,978$ 10,463,570$ 2,021,427$ 4,757,813$ 383,280$ 4,085,340$ 672,473$ 32 33 SSU GENERAL OFFICE - GREENVILLE DATA CENTER 34 6. GENERAL PLANT 35 390.05 Structures and Improvements (304,536)$ 3.34% (10,172)$ 381,813$ (686,349)$ (41,198)$ (1,376)$ 54,771$ (95,969)$ 36 391.04 Office Furniture and Equipment 11,873 4.03% 478 3,287 8,585 1,693 68 472 1,221 37 Subtotal (292,663)$ (9,693)$ 385,100$ (677,763)$ (39,505)$ (1,308)$ 55,243$ (94,748)$ 38 39 SSU GENERAL OFFICE - DISTRIBUTION AND MARKETING 40 6. GENERAL PLANT 41 390.20 Structures and Improvements 22,517$ 3.34% 752$ 331$ 22,186$ 11,521$ 385$ 170$ 11,351$ 42 390.29 Improvements to Leased Premises 22,919 4.06% 930 7,664 15,255 11,842 481 3,932 7,910 43 391.20 Office Furniture and Equipment 23,778 4.03% 958 2,588 21,190 12,322 497 1,383 10,939 44 394.20 Tools, Shop, and Garage Equipment - 8.88% - - - - - 2 (2) 45 397.20 Communication Equipment - 5.54% - 512 (512) 34 2 284 (249) 46 398.20 Miscellaneous Equipment - 1.72% - 237 (237) 29 0 127 (98) 47 399.21 Other Tangible Property - Servers Hardware 51,262 8.62% 4,419 131,631 (80,370) 31,376 2,705 69,958 (38,581) 48 399.22 Other Tangible Property - Servers Software (0) 8.78% (0) 494,466 (494,466) 21,160 1,858 258,051 (236,891) 49 399.23 Other Tangible Property - Network Hardware 9,966 8.72% 869 16,834 (6,868) 5,814 507 8,705 (2,891) 50 399.26 Other Tangible Property - PC Hardware 8,901 8.78% 781 41,078 (32,177) 6,018 528 21,643 (15,625) 51 399.28 Other Tangible Property - Application Software 687,922 6.57% 45,196 1,897,386 (1,209,463) 458,431 30,119 1,033,508 (575,077) 52 Subtotal 827,265$ 53,907$ 2,592,728$ (1,765,463)$ 558,548$ 37,081$ 1,397,761$ (839,213)$ 53 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Incremental Plant - SSU IRA-11 Alloc. Incremental Plant Page 1 of 3 187 Item 10. Line No. FERC Account No. FERC Account Titles Ref Change in Gross Plant as of 12/31/22 Depreciation Rate per GUD No. 10779 Depreciation Expense Accumulated Depreciation Net Plant (1) Allocated Gross Plant Allocated Depreciation Expense Allocated Accumulated Depreciation Allocated Net Plant (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Incremental Plant - SSU 54 SSU GENERAL OFFICE - ALIGNE PIPE PROJECTS 55 6. GENERAL PLANT 56 399.31 Other Tangible Property - Servers Hardware -$ 8.62% -$ 28,224$ (28,224)$ 717$ 62$ 2,099$ (1,382)$ 57 399.32 Other Tangible Property - Servers Software - 8.78% - 70,983 (70,983) 1,890 166 4,900 (3,010) 58 399.38 Other Tangible Property - Application Software 20,937 6.57% 1,376 1,372,532 (1,351,595) 52,168 3,427 103,358 (51,191) 59 Subtotal 20,937$ 1,376$ 1,471,739$ (1,450,802)$ 54,775$ 3,655$ 110,357$ (55,582)$ 60 61 TOTAL SSU GENERAL OFFICE 13,040,534$ 1,044,567$ 14,913,136$ (1,872,602)$ 5,331,630$ 422,709$ 5,648,700$ (317,070)$ 62 63 SSU CUSTOMER SUPPORT (DIVISION 012) 64 6. GENERAL PLANT 65 389.00 Land and Land Rights -$ 0.00% -$ -$ -$ 7,473$ -$ -$ 7,473$ 66 390.00 Structures and Improvements - 3.34% - 417,325 (417,325) 35,131 1,173 229,721 (194,590) 67 390.09 Improvements to Leased Premises 190,875 4.06% 7,750 121,895 68,979 108,477 4,404 69,882 38,595 68 391.00 Office Furniture and Equipment - 4.03% - 120,511 (120,511) 6,944 280 66,928 (59,985) 69 397.00 Communication Equipment - 5.54% - 110,901 (110,901) 4,974 276 62,448 (57,474) 70 398.00 Miscellaneous Equipment 14,075 1.72% 242 2,184 11,890 7,609 131 1,197 6,412 71 399.00 Other Tangible Property - 13.84% - - - - - (401) 401 72 399.01 Other Tangible Property - Servers Hardware 2,210,661 8.62% 190,559 1,113,606 1,097,055 1,197,607 103,234 608,009 589,598 73 399.02 Other Tangible Property - Servers Software - 8.78% - 200,442 (200,442) 5,743 504 110,943 (105,200) 74 399.03 Other Tangible Property - Network Hardware 1,030 8.72% 90 53,747 (52,717) 2,418 211 28,880 (26,462) 75 399.06 Other Tangible Property - PC Hardware 66,715 8.78% 5,858 90,521 (23,806) 37,419 3,285 47,616 (10,197) 76 399.07 Other Tangible Property - PC Software - 6.64% - - - - - (149) 149 77 399.08 Other Tangible Property - Application Software 3,955,006 6.57% 259,844 6,767,642 (2,812,635) 2,351,150 154,471 3,718,110 (1,366,961) 78 Subtotal 6,438,361$ 464,342$ 8,998,774$ (2,560,412)$ 3,764,944$ 267,969$ 4,943,184$ (1,178,240)$ 79 IRA-11 Alloc. Incremental Plant Page 2 of 3 188 Item 10. Line No. FERC Account No. FERC Account Titles Ref Change in Gross Plant as of 12/31/22 Depreciation Rate per GUD No. 10779 Depreciation Expense Accumulated Depreciation Net Plant (1) Allocated Gross Plant Allocated Depreciation Expense Allocated Accumulated Depreciation Allocated Net Plant (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Incremental Plant - SSU 80 SSU CUSTOMER SUPPORT - CHARLES K. VAUGHN TRAINING CENTER 81 6. GENERAL PLANT 82 389.10 Land and Land Rights -$ 0.00% -$ -$ -$ (73,421)$ -$ -$ (73,421)$ 83 390.10 Structures and Improvements - 3.34% - 402,712 (402,712) (489,883) (16,362) 125,943 (615,826) 84 391.10 Office Furniture and Equipment 41,273 4.03% 1,663 (23,063) 64,336 7,634 308 (21,009) 28,644 85 392.10 Transportation Equipment - 28.96% (27,886) 391 (391) (3,748) (21,114) (3,465) (282) 86 394.10 Tools, Shop, and Garage Equipment 45,590 8.88% 4,048 58,433 (12,843) 9,565 849 32,284 (22,719) 87 395.10 Laboratory Equipment (23,632) 10.00% (2,363) (23,139) (493) (17,894) (1,789) (17,525) (368) 88 397.10 Communication Equipment (259,910) 5.54% (14,399) (270,095) 10,185 (200,146) (11,088) (202,298) 2,152 89 398.10 Miscellaneous Equipment - 1.72% - 13,662 (13,662) (20,923) (360) 3,187 (24,110) 90 399.10 Other Tangible Property (140,469) 13.84% (19,441) (99,767) (40,702) (112,547) (15,576) (80,061) (32,486) 91 399.16 Other Tangible Property - PC Hardware 43,986 8.78% 3,862 (900) 44,886 28,777 2,527 (2,742) 31,519 92 399.17 Other Tangible Property - PC Software - 6.64% - 233 (233) (128) (9) 1,242 (1,371) 93 399.18 Other Tangible Property - Application Software - 15.89% - - - - - 388 (388) 94 Subtotal (293,163)$ (54,515)$ 58,465$ (351,628)$ (872,713)$ (62,615)$ (164,056)$ (708,657)$ 95 96 TOTAL SSU CUSTOMER SUPPORT 6,145,199$ 409,827$ 9,057,239$ (2,912,041)$ 2,892,232$ 205,354$ 4,779,129$ (1,886,897)$ 97 98 TOTAL SSU GENERAL OFFICE AND CUSTOMER SUPPORT 19,185,733$ 1,454,394$ 23,970,375$ (4,784,643)$ 8,223,862$ 628,062$ 10,427,829$ (2,203,967)$ 99 100 Miscellaneous Adjustments - Division 002 - - (185,588) 185,588 - - (75,927) 75,927 101 Adjusted Total 19,185,733$ 1,454,394$ 23,784,787$ (4,599,055)$ 8,223,862$ 628,062$ 10,351,902$ (2,128,040)$ 102 103 Note: 104 1. The Allocation Factor is not needed on this schedule. All amounts are the result of IRA-10 minus IRA-9; therefore, no allocation factor is required and the Column reference has been removed. IRA-11 Alloc. Incremental Plant Page 3 of 3 189 Item 10. Line No. Asset No. Project Reason Project Description FERC Plant Acct. No. In Service Date Customers Benefited (Location) Customer Class Benefited Total Project Cost (a) (b) (c) (d) (e) (f) (g) (h) (i) 11 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Investment Report - Direct Additions Project Report Please see the current year Project Report found on the flash drive provided at filing and the tabs, "MTX Additions" and "MTX Additions by FERC" for the direct additions by project and by utility account, respectively. IRA-12 Direct Additions Report Page 1 of 1 190 Item 10. Line No. Asset No. Project Reason Project Description FERC Plant Acct. No. Retirement Date Customers Benefited (Location) Customer Class Benefited Total Project Cost (a) (b) (c) (d) (e) (f) (g) (h) (i) 11 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Investment Report - Direct Retirements Project Report Please see the current year Project Report found on the flash drive provided at filing and the tabs, "MTX Retirements" and "MTX Retirements by FERC" for the direct retirements by project and by utility account, respectively. IRA-13 Direct Retire Report Page 1 of 1 191 Item 10. Line No. Asset No. Project Reason Project Description FERC Plant Acct. No. In Service Date Customers Benefited (Location) Customer Class Benefited Total Project Cost Allocation Factor Allocated Cost (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) 11 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Investment Report - Allocated Additions Project Report Please see the current year Project Report found on the flash drive provided at filing and the tabs, "SSU Additions" and "SSU Additions by FERC" for the allocated additions by project and by utility account, respectively. IRA-14 Alloc Add Report Page 1 of 1 192 Item 10. Line No. Asset No. Project Reason Project Description FERC Plant Acct. No. Retirement Date Customers Benefited (Location) Customer Class Benefited Total Project Cost Allocation Factor Allocated Cost (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) 11 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Investment Report - Allocated Retirements Project Report Please see the current year Project Report found on the flash drive provided at filing and the tabs, "SSU Retirements" and "SSU Retirements by FERC" for the allocated retirements by project and by utility account, respectively. IRA-15 Alloc Retire Report Page 1 of 1 193 Item 10. Line No. FERC Account No. FERC Account Titles Ref Additions Original Cost Depreciation Rate per GUD No. 10779 (1) Depreciation Expense (1) Accumulated Depreciation (2) Net Plant (2) (a) (b) (c) (d) (e) (f) (g) (h) (i) 11 1. INTANGIBLE PLANT 12 301.00 Organization -$ 0.00% -$ -$ -$ 13 302.00 Franchises and Consents - 0.00% - - - 14 303.00 Miscellaneous Intangible Plant - 0.00% - - - 15 Subtotal -$ -$ -$ -$ 16 17 5. DISTRIBUTION PLANT 18 374.01 Land -$ 0.00% -$ -$ -$ 19 374.02 Land Rights - 0.98% - - - 20 375.00 Structures and Improvements 5,053 1.71% - - - 21 376.00 Mains - Cathodic Protection 19,200,937 1.85% - - - 22 376.01 Mains - Steel 88,524,617 3.97% - - - 23 376.02 Mains - Plastic 556,239,265 2.21% - - - 24 378.00 M&R Station Equipment 27,796,344 3.09% - - - 25 379.00 City Gate Equipment 227,795 1.88% - - - 26 380.00 Services 267,966,692 3.67% - - - 27 381.00 Meters 33,699,492 3.31% - - - 28 382.00 Meter Installations 58,870,013 3.66% - - - 29 383.00 House Regulators 887,355 3.50% - - - 30 385.00 Industrial M&R Station Equipment 321,243 2.80% - - - 31 Subtotal 1,053,738,806$ -$ -$ -$ 32 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Direct Additions Detail IRA-16 Direct Additions Detail Page 1 of 2 194 Item 10. Line No. FERC Account No. FERC Account Titles Ref Additions Original Cost Depreciation Rate per GUD No. 10779 (1) Depreciation Expense (1) Accumulated Depreciation (2) Net Plant (2) (a) (b) (c) (d) (e) (f) (g) (h) (i) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Direct Additions Detail 33 6. GENERAL PLANT 34 389.00 Land and Land Rights -$ 0.00% -$ -$ -$ 35 390.00 Structures and Improvements 5,057,921 2.54% - - - 36 390.04 Air Conditioning Equipment 134,246 2.75% - - - 37 391.00 Office Furniture and Equipment 97,632 4.00% - - - 38 392.00 Transportation Equipment - 9.04% - - - 39 393.00 Stores Equipment - 4.00% - - - 40 394.00 Tools, Shop, and Garage Equipment 2,477,151 5.00% - - - 41 395.00 Laboratory Equipment (48,696) 10.00% - - - 42 396.00 Power Operated Equipment - 7.24% - - - 43 397.00 Communication Equipment - 6.67% - - - 44 398.00 Miscellaneous Equipment 43,775 2.50% - - - 45 399.00 Other Tangible Property - 14.29% - - - 46 399.01 Other Tangible Property - Servers Hardware - 14.29% - - - 47 399.02 Other Tangible Property - Servers Software - 14.29% - - - 48 399.03 Other Tangible Property - Network Hardware 377,313 11.11% - - - 49 399.06 Other Tangible Property - PC Hardware 1,968,404 14.29% - - - 50 399.07 Other Tangible Property - PC Software - 14.29% - - - 51 399.08 Other Tangible Property - Application Software - 14.29% - - - 52 Subtotal 10,107,745$ -$ -$ -$ 53 54 TOTAL 1,063,846,551$ -$ -$ -$ 55 Miscellaneous Adjustments 56 Adjusted Total 1,063,846,551$ -$ -$ -$ 57 58 Notes: 59 60 2. The Company does not maintain accumulated depreciation by individual asset. Therefore, the accumulated depreciation in Col (h) and net plant in Col (i) are not available. 1. The Company calculates depreciation expense using group depreciation. Therefore, the depreciation rates in Col (f) are for informational purposes only, and depreciation expense in Col (g) is not available for individual assets of utility plant. IRA-16 Direct Additions Detail Page 2 of 2 195 Item 10. Line No. FERC Account No. FERC Account Titles Ref Retirements Original Cost Depreciation Rate per GUD No. 10779 (1) Depreciation Expense (1) Accumulated Depreciation (2) Net Plant (2) (a) (b) (c) (d) (e) (f) (g) (h) (i) 11 1. INTANGIBLE PLANT 12 301.00 Organization -$ 0.00% -$ -$ -$ 13 302.00 Franchises and Consents - 0.00% - - - 14 303.00 Miscellaneous Intangible Plant - 0.00% - - - 15 Subtotal -$ -$ -$ -$ 16 17 5. DISTRIBUTION PLANT 18 374.01 Land -$ 0.00% -$ -$ -$ 19 374.02 Land Rights - 0.98% - - - 20 375.00 Structures and Improvements - 1.71% - - - 21 376.00 Mains - Cathodic Protection (138,186) 1.85% - - - 22 376.01 Mains - Steel (29,579,719) 3.97% - - - 23 376.02 Mains - Plastic (5,629,416) 2.21% - - - 24 378.00 M&R Station Equipment (9,512,987) 3.09% - - - 25 379.00 City Gate Equipment - 1.88% - - - 26 380.00 Services (13,116,205) 3.67% - - - 27 381.00 Meters (10,847,361) 3.31% - - - 28 382.00 Meter Installations (4,449,145) 3.66% - - - 29 383.00 House Regulators (2,489,604) 3.50% - - - 30 385.00 Industrial M&R Station Equipment 1,483 2.80% - - - 31 Subtotal (75,761,139)$ -$ -$ -$ 32 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Direct Retirement Detail IRA-17 Direct Retirement Detail Page 1 of 2 196 Item 10. Line No. FERC Account No. FERC Account Titles Ref Retirements Original Cost Depreciation Rate per GUD No. 10779 (1) Depreciation Expense (1) Accumulated Depreciation (2) Net Plant (2) (a) (b) (c) (d) (e) (f) (g) (h) (i) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Direct Retirement Detail 33 6. GENERAL PLANT 34 389.00 Land and Land Rights (134,822)$ 0.00% -$ -$ -$ 35 390.00 Structures and Improvements (3,038,637) 2.54% - - - 36 390.04 Air Conditioning Equipment (63,681) 2.75% - - - 37 391.00 Office Furniture and Equipment (1,088,937) 4.00% - - - 38 392.00 Transportation Equipment (345,519) 9.04% - - - 39 393.00 Stores Equipment - 4.00% - - - 40 394.00 Tools, Shop, and Garage Equipment (2,433,818) 5.00% - - - 41 395.00 Laboratory Equipment (295,595) 10.00% - - - 42 396.00 Power Operated Equipment - 7.24% - - - 43 397.00 Communication Equipment - 6.67% - - - 44 398.00 Miscellaneous Equipment - 2.50% - - - 45 399.00 Other Tangible Property (29,914) 14.29% - - - 46 399.01 Other Tangible Property - Servers Hardware (63,528) 14.29% - - - 47 399.02 Other Tangible Property - Servers Software (7,694) 14.29% - - - 48 399.03 Other Tangible Property - Network Hardware (136,168) 11.11% - - - 49 399.06 Other Tangible Property - PC Hardware (2,604,010) 14.29% - - - 50 399.07 Other Tangible Property - PC Software (9,216) 14.29% - - - 51 399.08 Other Tangible Property - Application Software (203,719) 14.29% - - - 52 Subtotal (10,455,258)$ -$ -$ -$ 53 54 TOTAL (86,216,397)$ -$ -$ -$ 55 Miscellaneous Adjustments 56 Adjusted Total (86,216,397)$ -$ -$ -$ 57 58 Notes: 59 60 2. The Company does not maintain accumulated depreciation by individual asset. Therefore, the accumulated depreciation in Col (h) and net plant in Col (i) are not available. 1. The Company calculates depreciation expense using group depreciation. Therefore, the depreciation rates in Col (f) are for informational purposes only, and depreciation expense in Col (g) is not available for individual assets of utility plant. IRA-17 Direct Retirement Detail Page 2 of 2 197 Item 10. Line No. FERC Account No. FERC Account Titles Ref Additions Original Cost Depreciation Rate per GUD No. 10779 (1) Depreciation Expense (1) Accumulated Depreciation (2) Net Plant (2) Allocation Factor Allocated Additions Original Cost Allocated Depreciation Expense (1) (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l) 11 SSU GENERAL OFFICE (DIVISION 002) 12 6. GENERAL PLANT 13 390.00 Structures and Improvements 22,517$ 3.34% -$ -$ -$ 40.09% 9,027$ -$ 14 390.09 Improvements to Leased Premises - 4.06% - - - 40.09% - - 15 391.00 Office Furniture and Equipment 129,663 4.03% - - - 40.09% 51,982 - 16 392.00 Transportation Equipment - 28.96% - - - 40.09% - - 17 393.00 Stores Equipment - 10.00% - - - 40.09% - - 18 394.00 Tools, Shop, and Garage Equipment - 8.88% - - - 40.09% - - 19 395.00 Laboratory Equipment - 10.00% - - - 40.09% - - 20 397.00 Communication Equipment 1,829 5.54% - - - 40.09% 733 - 21 398.00 Miscellaneous Equipment - 1.72% - - - 40.09% - - 22 399.00 Other Tangible Property - 13.84% - - - 40.09% - - 23 399.01 Other Tangible Property - Servers Hardware 7,770,830 8.62% - - - 40.09% 3,115,326 - 24 399.02 Other Tangible Property - Servers Software 104,886 8.78% - - - 40.09% 42,049 - 25 399.03 Other Tangible Property - Network Hardware 151,515 8.72% - - - 40.09% 60,742 - 26 399.06 Other Tangible Property - PC Hardware 729,442 8.78% - - - 40.09% 292,433 - 27 399.07 Other Tangible Property - PC Software - 6.64% - - - 40.09% - - 28 399.08 Other Tangible Property - Application Software 4,559,257 6.57% - - - 40.09% 1,827,806 - 29 399.09 Other Tangible Property - Mainframe Software - 6.21% - - - 40.09% - - 30 Subtotal 13,469,938$ -$ -$ -$ 5,400,098$ -$ 31 32 SSU GENERAL OFFICE - GREENVILLE DATA CENTER 33 6. GENERAL PLANT 34 390.05 Structures and Improvements (304,536)$ 3.34% -$ -$ -$ 14.18% (43,180)$ -$ 35 391.04 Office Furniture and Equipment 11,873 4.03% - - - 14.18% 1,683 - 36 Subtotal (292,663)$ -$ -$ -$ (41,496)$ -$ 37 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Additions Detail IRA-18 Alloc. Additions Detail Page 1 of 4 198 Item 10. Line No. FERC Account No. FERC Account Titles Ref Additions Original Cost Depreciation Rate per GUD No. 10779 (1) Depreciation Expense (1) Accumulated Depreciation (2) Net Plant (2) Allocation Factor Allocated Additions Original Cost Allocated Depreciation Expense (1) (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Additions Detail 38 SSU GENERAL OFFICE - DISTRIBUTION AND MARKETING 39 6. GENERAL PLANT 40 390.20 Structures and Improvements -$ 3.34% -$ -$ -$ 51.13% -$ -$ 41 390.29 Improvements to Leased Premises - 4.06% - - - 51.13% - - 42 391.20 Office Furniture and Equipment - 4.03% - - - 51.13% - - 43 394.20 Tools, Shop, and Garage Equipment - 8.88% - - - 51.13% - - 44 397.20 Communication Equipment - 5.54% - - - 51.13% - - 45 398.20 Miscellaneous Equipment - 1.72% - - - 51.13% - - 46 399.21 Other Tangible Property - Servers Hardware - 8.62% - - - 51.13% - - 47 399.22 Other Tangible Property - Servers Software (0) 8.78% - - - 51.13% (0) - 48 399.23 Other Tangible Property - Network Hardware - 8.72% - - - 51.13% - - 49 399.26 Other Tangible Property - PC Hardware - 8.78% - - - 51.13% - - 50 399.28 Other Tangible Property - Application Software 0 6.57% - - - 51.13% 0 - 51 Subtotal -$ -$ -$ -$ -$ -$ 52 53 SSU GENERAL OFFICE - ALIGNE PIPE PROJECTS 54 6. GENERAL PLANT 55 399.31 Other Tangible Property - Servers Hardware -$ 8.62% -$ -$ -$ 6.13% -$ -$ 56 399.32 Other Tangible Property - Servers Software - 8.78% - - - 6.13% - - 57 399.38 Other Tangible Property - Application Software 20,937 6.57% - - - 6.13% 1,284 - 58 Subtotal 20,937$ -$ -$ -$ 1,284$ -$ 59 60 TOTAL SSU GENERAL OFFICE 13,198,211$ -$ -$ -$ 5,359,887$ -$ 61 62 SSU CUSTOMER SUPPORT (DIVISION 012) 63 6. GENERAL PLANT 64 389.00 Land and Land Rights -$ 0.00% -$ -$ -$ 53.00% -$ -$ 65 390.00 Structures and Improvements - 3.34% - - - 53.00% - - 66 390.09 Improvements to Leased Premises 190,875 4.06% - - - 53.00% 101,164 - 67 391.00 Office Furniture and Equipment - 4.03% - - - 53.00% - - 68 397.00 Communication Equipment - 5.54% - - - 53.00% - - 69 398.00 Miscellaneous Equipment 14,075 1.72% - - - 53.00% 7,460 - 70 399.00 Other Tangible Property - 13.84% - - - 53.00% - - 71 399.01 Other Tangible Property - Servers Hardware 2,210,661 8.62% - - - 53.00% 1,171,650 - 72 399.02 Other Tangible Property - Servers Software - 8.78% - - - 53.00% - - 73 399.03 Other Tangible Property - Network Hardware 1,030 8.72% - - - 53.00% 546 - 74 399.06 Other Tangible Property - PC Hardware 66,715 8.78% - - - 53.00% 35,359 - 75 399.07 Other Tangible Property - PC Software - 6.64% - - - 53.00% - - 76 399.08 Other Tangible Property - Application Software 3,955,006 6.57% - - - 53.00% 2,096,153 - IRA-18 Alloc. Additions Detail Page 2 of 4 199 Item 10. Line No. FERC Account No. FERC Account Titles Ref Additions Original Cost Depreciation Rate per GUD No. 10779 (1) Depreciation Expense (1) Accumulated Depreciation (2) Net Plant (2) Allocation Factor Allocated Additions Original Cost Allocated Depreciation Expense (1) (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Additions Detail 77 Subtotal 6,438,361$ -$ -$ -$ 3,412,332$ -$ IRA-18 Alloc. Additions Detail Page 3 of 4 200 Item 10. Line No. FERC Account No. FERC Account Titles Ref Additions Original Cost Depreciation Rate per GUD No. 10779 (1) Depreciation Expense (1) Accumulated Depreciation (2) Net Plant (2) Allocation Factor Allocated Additions Original Cost Allocated Depreciation Expense (1) (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Additions Detail 78 79 SSU CUSTOMER SUPPORT - CHARLES K. VAUGHN TRAINING CENTER 80 6. GENERAL PLANT 81 389.10 Land and Land Rights -$ 0.00% -$ -$ -$ 71.83% -$ -$ 82 390.10 Structures and Improvements - 3.34% - - - 71.83% - - 83 391.10 Office Furniture and Equipment 89,211 4.03% - - - 71.83% 64,076 - 84 392.10 Transportation Equipment - 28.96% - - - 71.83% - - 85 394.10 Tools, Shop, and Garage Equipment 45,590 8.88% - - - 71.83% 32,745 - 86 395.10 Laboratory Equipment - 10.00% - - - 71.83% - - 87 397.10 Communication Equipment 30,297 5.54% - - - 71.83% 21,761 - 88 398.10 Miscellaneous Equipment - 1.72% - - - 71.83% - - 89 399.10 Other Tangible Property - 13.84% - - - 71.83% - - 90 399.16 Other Tangible Property - PC Hardware 56,025 8.78% - - - 71.83% 40,240 - 91 399.17 Other Tangible Property - PC Software - 6.64% - - - 71.83% - - 92 399.18 Other Tangible Property - Application Software - 15.89% - - - 71.83% - - 93 Subtotal 221,123$ -$ -$ -$ 158,822$ -$ 94 95 TOTAL SSU CUSTOMER SUPPORT 6,659,484$ -$ -$ -$ 3,571,154$ -$ 96 97 TOTAL SSU GENERAL OFFICE AND CUSTOMER SUPPORT 19,857,696$ -$ -$ -$ 8,931,040$ -$ 98 99 Miscellaneous Adjustments 100 Adjusted Total 19,857,696$ -$ -$ -$ 8,931,040$ -$ 101 102 Note: 103 104 2. The Company does not maintain accumulated depreciation by individual asset. Therefore, the accumulated depreciation in Col (h) and net plant in Col (i) are not available. 1. The Company calculates depreciation expense using group depreciation. Therefore, the depreciation rates in Col (f) are for informational purposes only, and depreciation expense in Cols. (g) and (l) are not available for individual assets of utility plant. IRA-18 Alloc. Additions Detail Page 4 of 4 201 Item 10. Line No. FERC Account No. FERC Account Titles Ref Retirements Original Cost Depreciation Rate per GUD No. 10779 (1) Depreciation Expense (1) Accumulated Depreciation (2) Net Plant (2) Allocation Factor Allocated Retirements Original Cost Allocated Depreciation Expense (1) (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l) 11 SSU GENERAL OFFICE (DIVISION 002) 12 6. GENERAL PLANT 13 390.00 Structures and Improvements -$ 3.34% -$ -$ -$ 40.09% -$ -$ 14 390.09 Improvements to Leased Premises - 4.06% - - - 40.09% - - 15 391.00 Office Furniture and Equipment - 4.03% - - - 40.09% - - 16 392.00 Transportation Equipment - 28.96% - - - 40.09% - - 17 393.00 Stores Equipment - 10.00% - - - 40.09% - - 18 394.00 Tools, Shop, and Garage Equipment - 8.88% - - - 40.09% - - 19 395.00 Laboratory Equipment - 10.00% - - - 40.09% - - 20 397.00 Communication Equipment - 5.54% - - - 40.09% - - 21 398.00 Miscellaneous Equipment - 1.72% - - - 40.09% - - 22 399.00 Other Tangible Property - 13.84% - - - 40.09% - - 23 399.01 Other Tangible Property - Servers Hardware - 8.62% - - - 40.09% - - 24 399.02 Other Tangible Property - Servers Software - 8.78% - - - 40.09% - - 25 399.03 Other Tangible Property - Network Hardware - 8.72% - - - 40.09% - - 26 399.06 Other Tangible Property - PC Hardware 20,372 8.78% - - - 40.09% 8,167 - 27 399.07 Other Tangible Property - PC Software (1,091,713) 6.64% - - - 40.09% (437,668) - 28 399.08 Other Tangible Property - Application Software 1,071,341 6.57% - - - 40.09% 429,501 - 29 399.09 Other Tangible Property - Mainframe Software - 6.21% - - - 40.09% - - 30 Subtotal -$ -$ -$ -$ -$ -$ 31 32 SSU GENERAL OFFICE - GREENVILLE DATA CENTER 33 6. GENERAL PLANT 34 390.05 Structures and Improvements -$ 3.34% -$ -$ -$ 14.18% -$ -$ 35 391.04 Office Furniture and Equipment - 4.03% - - - 14.18% - - 36 Subtotal -$ -$ -$ -$ -$ -$ 37 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Retirement Detail IRA-19 Alloc. Retire Detail Page 1 of 4 202 Item 10. Line No. FERC Account No. FERC Account Titles Ref Retirements Original Cost Depreciation Rate per GUD No. 10779 (1) Depreciation Expense (1) Accumulated Depreciation (2) Net Plant (2) Allocation Factor Allocated Retirements Original Cost Allocated Depreciation Expense (1) (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Retirement Detail 38 SSU GENERAL OFFICE - DISTRIBUTION AND MARKETING 39 6. GENERAL PLANT 40 390.20 Structures and Improvements -$ 3.34% -$ -$ -$ 51.13% -$ -$ 41 390.29 Improvements to Leased Premises - 4.06% - - - 51.13% - - 42 391.20 Office Furniture and Equipment - 4.03% - - - 51.13% - - 43 394.20 Tools, Shop, and Garage Equipment - 8.88% - - - 51.13% - - 44 397.20 Communication Equipment - 5.54% - - - 51.13% - - 45 398.20 Miscellaneous Equipment - 1.72% - - - 51.13% - - 46 399.21 Other Tangible Property - Servers Hardware - 8.62% - - - 51.13% - - 47 399.22 Other Tangible Property - Servers Software - 8.78% - - - 51.13% - - 48 399.23 Other Tangible Property - Network Hardware - 8.72% - - - 51.13% - - 49 399.26 Other Tangible Property - PC Hardware - 8.78% - - - 51.13% - - 50 399.28 Other Tangible Property - Application Software - 6.57% - - - 51.13% - - 51 Subtotal -$ -$ -$ -$ -$ -$ 52 53 SSU GENERAL OFFICE - ALIGNE PIPE PROJECTS 54 6. GENERAL PLANT 55 399.31 Other Tangible Property - Servers Hardware -$ 8.62% -$ -$ -$ 6.13% -$ -$ 56 399.32 Other Tangible Property - Servers Software - 8.78% - - - 6.13% - - 57 399.38 Other Tangible Property - Application Software - 6.57% - - - 6.13% - - 58 Subtotal -$ -$ -$ -$ -$ -$ 59 60 TOTAL SSU GENERAL OFFICE -$ -$ -$ -$ -$ -$ 61 IRA-19 Alloc. Retire Detail Page 2 of 4 203 Item 10. Line No. FERC Account No. FERC Account Titles Ref Retirements Original Cost Depreciation Rate per GUD No. 10779 (1) Depreciation Expense (1) Accumulated Depreciation (2) Net Plant (2) Allocation Factor Allocated Retirements Original Cost Allocated Depreciation Expense (1) (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Retirement Detail 62 SSU CUSTOMER SUPPORT (DIVISION 012) 63 6. GENERAL PLANT 64 389.00 Land and Land Rights -$ 0.00% -$ -$ -$ 53.00% -$ -$ 65 390.00 Structures and Improvements - 3.34% - - - 53.00% - - 66 390.09 Improvements to Leased Premises - 4.06% - - - 53.00% - - 67 391.00 Office Furniture and Equipment - 4.03% - - - 53.00% - - 68 397.00 Communication Equipment - 5.54% - - - 53.00% - - 69 398.00 Miscellaneous Equipment - 1.72% - - - 53.00% - - 70 399.00 Other Tangible Property - 13.84% - - - 53.00% - - 71 399.01 Other Tangible Property - Servers Hardware - 8.62% - - - 53.00% - - 72 399.02 Other Tangible Property - Servers Software - 8.78% - - - 53.00% - - 73 399.03 Other Tangible Property - Network Hardware - 8.72% - - - 53.00% - - 74 399.06 Other Tangible Property - PC Hardware - 8.78% - - - 53.00% - - 75 399.07 Other Tangible Property - PC Software - 6.64% - - - 53.00% - - 76 399.08 Other Tangible Property - Application Software - 6.57% - - - 53.00% - - 77 Subtotal -$ -$ -$ -$ -$ -$ 78 IRA-19 Alloc. Retire Detail Page 3 of 4 204 Item 10. Line No. FERC Account No. FERC Account Titles Ref Retirements Original Cost Depreciation Rate per GUD No. 10779 (1) Depreciation Expense (1) Accumulated Depreciation (2) Net Plant (2) Allocation Factor Allocated Retirements Original Cost Allocated Depreciation Expense (1) (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Allocated Retirement Detail 79 SSU CUSTOMER SUPPORT - CHARLES K. VAUGHN TRAINING CENTER 80 6. GENERAL PLANT 81 389.10 Land and Land Rights -$ 0.00% -$ -$ -$ 71.83% -$ -$ 82 390.10 Structures and Improvements - 3.34% - - - 71.83% - - 83 391.10 Office Furniture and Equipment (47,939) 4.03% - - - 71.83% (34,432) - 84 392.10 Transportation Equipment - 28.96% - - - 71.83% - - 85 394.10 Tools, Shop, and Garage Equipment - 8.88% - - - 71.83% - - 86 395.10 Laboratory Equipment (23,632) 10.00% - - - 71.83% (16,974) - 87 397.10 Communication Equipment (290,207) 5.54% - - - 71.83% (208,442) - 88 398.10 Miscellaneous Equipment - 1.72% - - - 71.83% - - 89 399.10 Other Tangible Property (140,469) 13.84% - - - 71.83% (100,892) - 90 399.16 Other Tangible Property - PC Hardware (12,039) 8.78% - - - 71.83% (8,647) - 91 399.17 Other Tangible Property - PC Software - 6.64% - - - 71.83% - - 92 399.18 Other Tangible Property - Application Software - 15.89% - - - 71.83% - - 93 Subtotal (514,286)$ -$ -$ -$ (369,387)$ -$ 94 95 TOTAL SSU CUSTOMER SUPPORT (514,286)$ -$ -$ -$ (369,387)$ -$ 96 97 TOTAL SSU GENERAL OFFICE AND CUSTOMER SUPPORT (514,286)$ -$ -$ -$ (369,387)$ -$ 98 99 Miscellaneous Adjustments 100 Adjusted Total (514,286)$ -$ -$ -$ (369,387)$ -$ 101 102 Notes: 103 104 2. The Company does not maintain accumulated depreciation by individual asset. Therefore, the accumulated depreciation in Col (h) and net plant in Col (i) are not available. 1. The Company calculates depreciation expense using group depreciation. Therefore, the depreciation rates in Col (f) are for informational purposes only, and depreciation expense in Cols. (g) and (l) are not available for individual assets of utility plant. IRA-19 Alloc. Retire Detail Page 4 of 4 205 Item 10. Line No. (a) (b) (c) (d) (e) (f) (g) (h) 10 Return on Investment 11 Invested Capital (Rate Base) 5,467,281,616$ 6,319,577,780$ 12 Rate of Return 7.97% 7.97% 13 Return on Investment 435,578,326$ 503,480,762$ 14 15 Interest Expense 16 Invested Capital (Rate Base) 5,467,281,616$ 6,319,577,780$ 17 Weighted Cost of Debt 2.07% 2.07% 18 Interest Expense 113,118,057$ 130,752,064$ 19 20 After Tax Income 322,460,270$ 372,728,697$ 21 22 Gross-up Factor =1+(E26/(1-E26)) 1.27 =1+(H26/(1-H26)) 1.27 23 24 Before Tax Return 408,177,557$ 471,808,478$ 25 26 Federal Income Tax Rate 21.00% 21.00% 27 28 Federal Income Tax 85,717,287$ 99,079,780$ 29 30 Change in Federal Income Tax 13,362,493$ 31 32 Notes: 33 34 2. Invested Capital (Rate Base) Current Year is Balance of Rate Base (Prior Year) plus IRA Change for current year. 35 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Calculation of Federal Income Tax Description Prior Year Current Year 1. Invested Capital (Rate Base) Prior Year is Balance of Rate Base approved in the 2020 MTX ATM Interim Rate Adjustment Filing, tab "IRA-20 FIT", Col (g), Line 11. IRA- 20 FIT Page 1 of 2 206 Item 10. Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Calculation of Federal Income Tax 36 37 Alternative Calculation: 38 39 Calculation 40 (e) (f) 41 42 Cost of Common Equity 151,735,953$ GUD No. 10779, Sch G, Col (c), Ln 4 43 Total Invested Capital 2,572,769,055 GUD No. 10779, Sch G, Col (c), Ln 13 44 Return Rate, per GUD No. 10779 5.898% Ln 42 divided by Ln 43 45 Federal Income Tax Factor 26.58228% (1 /.79) * (.21) 46 Federal Income Tax Adjustment Factor 1.568% Ln 44 times Ln 45 47 Change in Invested Capital - Net Utility Plant 852,296,165$ IRA-5, Col (h), Ln 16 48 Change in Federal Income Tax 13,362,493$ Ln 46 times Ln 47 Description Reference (b through d) (g through h) IRA- 20 FIT Page 2 of 2 207 Item 10. Line No.Description Beginning Tax Change Current Tax Notes: (a) (b) (c) (d) (e) (f) 10 Non Revenue - Related 11 12 Ad Valorem Tax 90,325,173$ 19,642,659$ 109,967,832$ 13 14 Revenue - Related 15 16 State Gross Receipts - Tax NA NA NA 1 17 Local Gross Receipts - Tax NA NA NA 1 18 Railroad Commission - Gas Utility Tax NA NA NA 1 19 20 Total Revenue Related Taxes -$ -$ -$ 21 22 23 TOTAL TAXES OTHER THAN INCOME 90,325,173$ 19,642,659$ 109,967,832$ 24 25 26 Ad Valorem Tax Change: Direct Allocated SSU General Office Allocated SSU Customer Support Total 27 Change in Net Plant (IRA-8 and IRA-11) 855,629,276$ (241,143)$ (1,886,897)$ 28 Current Year Ad Valorem Tax Rate % 2.30% 0.79% 0.47% 29 Calculated Ad Valorem Tax Change 19,653,460$ (1,913)$ (8,888)$ 19,642,659$ 30 Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Ad Valorem and Revenue-related Tax IRA- 21 Ad Valorem Page 1 of 2 208 Item 10. Line No.Description Beginning Tax Change Current Tax Notes: (a) (b) (c) (d) (e) (f) Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Ad Valorem and Revenue-related Tax 31 Ad Valorem Calculation: 32 Mid-Tex Ad Valorem Tax 73,281,205$ 2022 Ad Valorem Taxes Paid for Mid-Tex Direct Property 33 Capitalized Mid-Tex Ad Valorem Tax (1,587,144) 2022 Ad Valorem Taxes Capital for Mid-Tex 34 Total Mid-Tex Ad Valorem 71,694,061$ Sum of Line 32 through Line 33 35 Mid-Tex Net Plant per GUD No. 10779 3,121,258,952 GUD No. 10779, Sch C, Col (f), Ln 42 minus Sch D, Col (f), Ln 42 36 Mid-Tex Ad Valorem Tax Rate 2.30% Line 34 divided by Line 35 37 38 SSU General Office Ad Valorem Tax 610,064$ 2022 Ad Valorem Taxes Paid for SSU General Office Property 39 Capitalized SSU General Office Ad Valorem Tax - 2022 Ad Valorem Taxes Capital for SSU General Office 40 Total SSU General Office Ad Valorem 610,064$ Sum of Line 38 through Line 39 41 FY23 Allocation Factor 40.09% IRA-5A, Col (d), Line 10 42 Allocated SSU General Office Ad Valorem 244,574$ Line 40 times Line 41 43 SSU General Office Net Plant per GUD No. 10779 30,826,474 GUD No. 10779, Sch C, Col (f), Ln 146 minus Sch D, Col (f), Ln 148 44 SSU General Office Ad Valorem Tax Rate 0.79% Line 42 divided by Line 43 45 46 SSU Customer Support Ad Valorem Tax 505,873$ 2022 Ad Valorem Taxes Paid for SSU Customer Support Property 47 Capitalized SSU Customer Support Ad Valorem Tax - 2022 Ad Valorem Taxes Capital for SSU Customer Support 48 Total SSU Customer Support Ad Valorem 505,873$ Sum of Line 46 through Line 47 49 FY23 Allocation Factor 53.00% IRA-5A, Col (d), Line 18 50 Allocated SSU Customer Support Ad Valorem 268,113$ Line 48 times Line 49 51 SSU Customer Support Net Plant per GUD No. 10779 56,920,406 GUD No. 10779, Sch C, Col (f), Ln 81 minus Sch D, Col (f), Ln 82 52 SSU Customer Support Ad Valorem Tax Rate 0.47% Line 50 divided by Line 51 53 54 Note: 55 1. Amounts are recovered through Rider FF and TAX. IRA- 21 Ad Valorem Page 2 of 2 209 Item 10. Line No. IRA Schedule Reference (a) (b) (c) 11 IRA-21 1 12 IRA-21 2 13 IRA-6 and IRA-7A, IRA-9 and IRA-10A 3 14 15 IRA-10A 4 The following CY 2018 projects have been removed from this filing: 16 17 MTX SSU 18 080.59985 010.31067 19 010.34108 20 21 IRA-10A 5 22 23 24 010.35374 010.36560 25 010.35380 010.36563 26 010.36182 010.36590 27 010.36193 010.36886 28 010.36542 010.37331 29 010.36550 The following Calendar Year 2020 projects have been removed from this filing: SSU (d) Column (c) is the amount authorized in most recent rate case or interim rate adjustment. This tax is collected through a separate surcharge. All projects removed in GUD No. 10779 (prior dockets) have been removed from this filing. Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Footnotes Comments IRA-22 Footnotes Page 1 of 1 210 Item 10. February 17, 2023 Date Signature Title: Vice President, Rates and Regulatory Affairs Address: 5420 LBJ Freeway, Suite 1800 Dallas, Texas 75240 Phone: 214.206.2568 Email address:christopher.felan@atmosenergy.com Alternative contact regarding this report: Name: Shelly Bass Title: Associate General Counsel Address: 5430 LBJ Freeway, Suite 1800 Dallas, Texas 75240-2601 Phone: 972.855.3756 Email address:shelly.bass@atmosenergy.com I understand that until the issuance of a final order or decision by a regulatory authority in a rate case that is filed after the implementation of a rate schedule under this section, all amounts collected under the rate schedules before the filing of the rate case are subject to refund. Atmos Energy Corp., Mid-Tex Division Interim Rate Adjustment Application Twelve (12) Month Period Ending December 31, 2022 Signature Page I certify that I am the responsible official of Atmos Energy Corp., Mid-Tex Division; that I have examined the foregoing report; that to the best of my knowledge, information, and belief, all statements of fact contained in the said report are true and the said report is a correct statement of the business and affairs of the above-named respondent in respect to each and every matter set forth therein during the Period Ending December 31, 2022. IRA-23 Signature Page Page 1 of 1 211 Item 10. Check one: This is an original submission [ X ] This is a revised submission [ ] Date of submission: February 24, 2023 Twelve Month Period Ending December 31, 2022 ANNUAL EARNINGS MONITORING REPORT OF ATMOS ENERGY CORP. MID-TEX DIVISION TO THE ATMOS TEXAS MUNICIPALITIES COALITION ("ATM") FOR THE 212 Item 10. Line No. Description Total Reference Adjustment Amount Total Accounts Increase / Decrease Amount Total (a) (b) (c) (d) (e) (f) (g) (h) 1 Total Operating Revenues 1,553,062,221$ 1, 2 (20,359,222)$ 1,532,702,998$ 3 926,235,775$ 2,458,938,774$ 2 3 Operating Expenses: 4 Gas Cost 816,965,570$ -$ 816,965,570$ 627,124,593$ 1,444,090,163$ 5 Operation and Maintenance Expenses 188,019,326 1, 2 (5,212,242) 182,807,084 4 73,127,399 255,934,482 6 Depreciation and Amortization Expense 144,321,772 1, 2 - 144,321,772 403 75,509,298 219,831,070 7 Taxes Other Than Income Taxes 139,922,896 (1,261,237) 138,661,660 408.1 74,309,001 212,970,660 8 Interest on Customer Deposits and Advances 117,764 1, 2 - 117,764 431 (113,654) 4,110 9 10 Total Operating Expenses Before Federal Income Taxes (Sum of Line 4 through 8)1,289,347,328$ 1, 2 (6,473,479)$ 1,282,873,849$ 849,956,636$ 2,132,830,485$ 11 12 Total Operating Income Before Federal Income Taxes (Line 1 - Line 10)263,714,893$ 1, 2 (13,885,744)$ 249,829,149$ 76,279,140$ 326,108,289$ 13 14 Federal Income Taxes 47,900,569$ 1, 2, 5 (3,027,199)$ 44,873,370$ (2,166,899)$ 42,706,471$ 15 16 Return on Rate Base (Line 12 - Line 14) 215,814,324$ 1, 2 (10,858,544)$ 204,955,779$ 78,446,039$ 283,401,818$ 17 18 19 Rate Base 2,573,010,626$ 6 (241,571)$ 2,572,769,055$ 3,359,765,633$ 5,932,534,688$ 20 Percent Return on Rate Base - Proposed and Approved (Cols (b)(e)(h))8.39% 7.97% 7.97% 21 Calculated Allowed Return (Line 19 * Line 20)204,955,779$ 472,606,458$ 22 23 Excess Return (Deficit) (Line 16 - Line 21)(189,204,640)$ 24 25 Allowed Rate of Return - GUD No. 10779 Final Order, Finding of Fact 35 7.97% 26 Actual Rate of Return - Year 2022 (Line 16 / Line 19)4.78% 27 ATMOS ENERGY CORP. - MID-TEX DIVISION ANNUAL EARNINGS MONITORING REPORT AS OF DECEMBER 31, 2022 At Rates At 12/31/22At Rates At 12/31/17 EMR-1 EMR Summary Page 1 of 2 213 Item 10. Line No. Description Total Reference Adjustment Amount Total Accounts Increase / Decrease Amount Total (a) (b) (c) (d) (e) (f) (g) (h) ATMOS ENERGY CORP. - MID-TEX DIVISION ANNUAL EARNINGS MONITORING REPORT AS OF DECEMBER 31, 2022 At Rates At 12/31/22At Rates At 12/31/17 28 Notes: 29 30 31 32 33 34 5. The amount in Column (h) is from EMR-2 Tax, Column (b), Line 16. 6. The amount in Column (h) is from EMR-3 Rate Base, Column (f), Line 24. 1. Column (b) is the Company's Proposed Cost of Service from GUD No. 10779. Column (e) which represents the Cost of Service approved in the Final Order issued in GUD No. 10779; Column (d) is the calculated adjustment (Column (e) minus Column (b)). 2. Column (h) represents the current year amounts; Column (g) is the calculated adjustment (Column (h) minus Column (e)). 4. The amount includes the following accounts: 870-872, 874, 875, 878-881, 885-889, 891-894, 901-904, 908, 910-913, 920-926, 928, 930.2-932. 3. Column (h), Line 1 includes revenues and unbilled revenues reported in FERC Accounts 480, 481, 487, 488, 489.3, and 495. EMR-1 EMR Summary Page 2 of 2 214 Item 10. Line No. Description Adjusted Amount Reference (a) (b) (c) 1 Total Revenues 2,458,938,774$ EMR-1, Column (h), Line 1 2 3 Deduct: 4 Gas Cost 1,444,090,163$ EMR-1, Column (h), Line 4 5 Operation and Maintenance Expenses 255,934,482 EMR-1, Column (h), Line 5 6 Depreciation and Amortization Expense 219,831,070 EMR-1, Column (h), Line 6 7 Taxes Other Than Income Taxes 212,970,660 EMR-1, Column (h), Line 7 8 Interest on Customer Deposits and Advances 4,110 EMR-1, Column (h), Line 8 9 Interest Expense 122,744,143 See Note 1 10 Total Deducts 2,255,574,628$ Sum of Lines 4 through 9 11 12 Book Taxable Income 203,364,146$ Line 1 - Line 10 13 14 Tax Rate 21% Statutory Tax Rate 15 16 Total Federal Income Taxes 42,706,471$ Line 12 times Line 14 17 18 Note: 19 1. This amount is calculated by applying the weighted cost of debt to the total rate base (EMR-4, Column (e), Line 1 20 times EMR-4, Column (b), Line 5). ATMOS ENERGY CORP. - MID-TEX DIVISION ANNUAL EARNINGS MONITORING REPORT FEDERAL INCOME TAX SCHEDULE AT END OF REPORTING PERIOD AS OF DECEMBER 31, 2022 EMR-2 Tax Page 1 of 1 215 Item 10. Line No. Description Per Books (1) Ref (2) Adjustments Ref (3) Adjusted Amount (a)(b) (c) (d) (e) (f) 1 Net Plant in Service 2 Utility Plant in Service 8,664,254,676$ 101 39,424,222$ 3 8,703,678,898$ 3 Accum. Provision for Depreciation and Amort. 1,813,245,682 108/111 (77,880,036) 3 1,735,365,645 4 Net Gas Distribution Plant in Service (Line 2 - Line 3)6,851,008,994$ 117,304,259$ 6,968,313,253$ 5 6 Additions: 7 Materials & Supplies 16,731,462$ 154/163 (2,191,548)$ 4 14,539,914$ 8 Prepayments 30,911,861 165 2,283,902 4 33,195,764 9 Gas Stored Underground 163,161,885 164.1 (163,161,885) 5 - 10 Other - - 6 - 11 Total Additions (Sum of Line 7 through Line 10) 210,805,209$ (163,069,531)$ 47,735,678$ 12 13 Deductions: 14 Customer Deposits 10,856,796$ 235 -$ 10,856,796$ 15 Customer Advances for Construction 1,000,000 252 - 1,000,000 16 Injuries and Damages Reserve 2,539,887 228.2 - 2,539,887 17 Accum. Deferred Income Taxes 900,813,145 190/282/283 (55,322,612) 7 845,490,532 18 Regulatory Liability 175,181,507 174/186/242/253 - 8 175,181,507 19 Rate Base Adjustments - 21,912,242 9 21,912,242 20 Total Deductions (Sum of Line 14 through Line 19)1,090,391,335$ (33,410,370)$ 1,056,980,965$ 21 22 Total Cash Working Capital -$ (26,533,278)$ 10 (26,533,278)$ 23 24 Total Rate Base (Line 4 + Line 11 - Line 20 + Line 22)5,971,422,868$ (38,888,180)$ 5,932,534,688$ 25 26 Notes: 27 1. Column (c) references the FERC Account numbers associated with the amounts included in Column (b). 28 2. The information listed in Column (e) refers to the footnote explanation of the adjustment shown in Column (d). 29 3. Column (d) includes adjustments for Poly 1 and the Rule 8.209 Regulatory Asset. 30 4. Adjusted to 13 month averages. 31 5. Working Gas in Storage (FERC Account 164.1) moved to Pipeline to reflect GUD No. 9400 Final Order classification for rate purposes. 32 6. Line 10 is an input area for adjustments. 33 34 8. The Regulatory Liability represents the excess deferred income taxes resulting from the revaluation of ADIT due to the Tax Cuts and Jobs Act. 35 9. Adjusted to include the Miscellaneous Adjustment amount for the current period and amounts included in prior dockets. 36 10. The Cash Working Capital is the amount included in the GUD No. 10779 Final Order Model, Schedule B, Column (e), Line 20. ATMOS ENERGY CORP. - MID-TEX DIVISION ANNUAL EARNINGS MONITORING REPORT TOTAL RATE BASE AS OF DECEMBER 31, 2022 7. Includes an adjustment for the Federal NOL Carryover - Non Reg; Federal NOL Carryover - Other; impact from Winter Storm Uri; and Storage Gas (See Footnote 5). EMR-3 Rate Base Page 1 of 1 216 Item 10. Line No. Description Balance Percent of Total Cost Weighted Cost (a) (b) (c) (d) (e) = (c) x (d) 1 Long-Term Debt 2,362,257,764$ 39.82% 5.20% 2.07% 2 3 Common Equity 3,570,276,924 60.18% 9.80% 5.90% 4 5 Total (Line 1 + Line 3) 5,932,534,688$ 100.00% 7.97% 6 7 Notes: 8 1. Column (c) is the approved Capital Structure from GUD No. 10779, Schedule G, Lines 10 and 11. 9 2. Column (d) figures are the approved rates of return from GUD No. 10779, Schedule G, Lines 3 and 4. ATMOS ENERGY CORP. - MID-TEX DIVISION ANNUAL EARNINGS MONITORING REPORT WEIGHTED AVERAGE COST OF CAPITAL AS OF DECEMBER 31, 2022 EMR-4 Cost of Capital Page 1 of 1 217 Item 10. February 17, 2023 Date Signature Title: Vice President, Rates and Regulatory Affairs Address: 5420 LBJ Freeway, Suite 1800 Dallas, TX 75240 Phone: 214.206.2568 Email address: Christopher.Felan@atmosenergy.com Alternative contact regarding this report: Name: Shelly Bass Title: Associate General Counsel Address: 5430 LBJ Freeway, Suite 1800 Dallas, Texas 75240-2601 Phone: 972.855.3756 Email address: Shelly.Bass@atmosenergy.com INTERIM RATE ADJUSTMENT APPLICATION ATMOS ENERGY CORP. - MID-TEX DIVISION I certify that I am the responsible official of Atmos Energy Corp., Mid-Tex Division; that I have examined the foregoing report; that to the best of my knowledge, information, and belief, all statements of fact contained in the said report are true and the said report is a correct statement of the business and affairs of the above- named respondent in respect to each and every matter set forth therein during the period from January 1, 2022 to December 31, 2022 inclusive. I understand until the issuance of a final order or decision by a regulatory authority in a rate case that is filed after the implementation of a tariff or rate schedule under this section, all amounts collected under the tariff or rate schedule before the filing of the rate case are subject to refund. EMR-5 Signature Page Page 1 of 1 218 Item 10. ATMOS ENERGY CORP., MID-TEX DIVISION INTERIM RATE ADJUSTMENT APPLICATION PROJECT REPORT 2022 ADDITIONS 219 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE MID-TEX ADDITIONS 1 080.33345 0 NORTH REGION, NORTHEAST AREA OPERATIONS BLANKET FOR REPLACE/RETIRE SERVICE LINES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER 2 080.33346 0 NORTH REGION, NORTHWEST AREA OPERATIONS BLANKET FOR REPLACE/RETIRE SERVICE LINES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER 3 080.33347 873 SOUTHEAST REGION, DALLAS AREA OPERATIONS BLANKET FOR REPLACE/RETIRE SERVICE LINES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4 080.33348 1 SOUTHEAST REGION, EAST AREA OPERATIONS BLANKET FOR REPLACE/RETIRE SERVICE LINES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 5 080.33349 0 SOUTHEAST REGION, SOUTH AREA OPERATIONS BLANKET FOR REPLACE/RETIRE SERVICE LINES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER 6 080.33350 0 SOUTHWEST REGION, FT. WORTH AREA OPERATIONS BLANKET FOR REPLACE/RETIRE SERVICE LINES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 7 080.33351 0 SOUTHWEST REGION, SOUTH AREA OPERATIONS BLANKET FOR REPLACE/RETIRE SERVICE LINES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY SEPTEMBER 8 080.33352 0 SOUTHWEST REGION, WEST AREA OPERATIONS BLANKET FOR REPLACE/RETIRE SERVICE LINES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 9 080.33353 0 NORTH REGION, NORTHEAST AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO 250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER 10 080.33354 0 NORTH REGION, NORTHWEST AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO 250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER 11 080.33355 0 SOUTHEAST REGION, DALLAS AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO 250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 12 080.33356 0 SOUTHEAST REGION, EAST AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO 250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 13 080.33357 0 SOUTHEAST REGION, SOUTH AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO 250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER 14 080.33358 63 SOUTHWEST REGION, FT. WORTH AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO 250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 15 080.33359 0 SOUTHWEST REGION, SOUTH AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO 250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY SEPTEMBER 16 080.33360 0 SOUTHWEST REGION, WEST AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO 250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 17 080.33487 826 INSTALL 500 FEET OF 8 INCH POLY ALONG HIGHWAY 83-84 AND ABANDON 500 FEET OF 10 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 18 080.33492 236 INSTALL 1950 FEET OF 2 INCH POLY ALONG BENSON STREET AND ABANDON 1950 FEET OF 2 INCH POLY AND 122 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WINGATE SYSTEM INTEGRITY OCTOBER 19 080.33502 234 INSTALL 375 FEET OF 6 INCH POLY ALONG RICHLAND DRIVE AND ABANDON 375 FEET OF 6 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 20 080.33506 98 ABANDON 772 FEET OF 4 INCH STEEL IN AN ALLEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER 21 080.33507 133 INSTALL 480 FEET OF 2 INCH POLY AT SOUNDOWN AND CALVERT STREETS AND ABANDON 1250 FEET OF 10 INCH STEEL AND 507 FEET OF 4 INCH AND 212 FEET OF 2 INCH POLY DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER 22 080.33513 16 INSTALL 433 FEET OF 2 INCH POLY ALONG AVENUE G AND ABANDON 433 FEET OF 1.25 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY SYSTEM INTEGRITY OCTOBER 23 080.33519 6 INSTALL 331 FEET OF 2 INCH POLY IN AN ALLEY N OF 19TH STREET AND ABANDON 331 FEET OF 2 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANSON SYSTEM INTEGRITY OCTOBER 24 080.33520 253 ABANDON 297 FEET OF 3 INCH STEEL ALONG ELM STREET IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLOOMING GROVE SYSTEM INTEGRITY OCTOBER 25 080.33546 379 INSTALL 550 FEET OF 4 INCH POLY ALONG AVENUE B AND 14TH STREET AND ABANDON 162 FEET OF 4 INCH, 342 FEET OF 3 INCH AND 1290 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY OCTOBER 26 080.33548 178 INSTALL 288 FEET OF 2 INCH POLY IN AN ALLEY EAST OF WILLIS AND ABANDON 288 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 27 080.33561 2,995 INSTALL 600 FEET OF 12 INCH STEEL ALONG 23RD STREET AND ABANDON 540 FEET OF 12 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 28 080.33604 349 INSTALL 197 FEET OF 4 INCH AND 263 FEET OF 2 INCH POLY ALONG MURRAY STREET AND COULTER STREET AND ABANDON 153 FEET OF 4 INCH AND 209 FEET OF 3 INCH STEEL AND 11 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ROCKDALE SYSTEM INTEGRITY OCTOBER 29 080.33654 368 INSTALL 260 FEET OF 4 INCH POLY ALONG 21ST STREET AND ABANDON 260 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 30 080.33662 16 INSTALL 147 FEET OF 2 INCH POLY ALONG ELIZABETH STREET AND ABANDON 147 FEET OF 2 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 31 080.33663 15 INSTALL 400 FEET OF 6 INCH POLY ALONG 10TH STREET AND ABANDON 400 FEET OF 10 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 32 080.33676 105 INSTALL 199 FEET OF 4 INCH POLY IN AN ALLEY AND ABANDON 199 FEET OF 4 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY OCTOBER 33 080.33726 286 INSTALL 328 FEET OF 4 INCH AND 218 FEET OF 2 INCH POLY ALONG HILLYER STREET AND COULTER STREET AND ABANDON 310 FEET OF 3 INCH AND 216 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKDALE SYSTEM INTEGRITY OCTOBER 34 080.33733 78 INSTALL 215 FEET OF 2 INCH POLY ALONG PEAR STREET AND ABANDON 200 FEET OF 3 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 35 080.33734 78 INSTALL 315 FEET OF 2 INCH POLY ALONG FM 381 AND ABANDON 300 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY OCTOBER MTX Additions Page 1 of 178 220 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 36 080.33735 65 INSTALL 215 FEET OF 4 INCH POLY ALONG EAST 33RD STREET AND ABANDON 200 FEET OF 3 INCH BARE STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 37 080.33742 818 INSTALL 1135 FEET OF 2 INCH POLY AND ABANDON 1132 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUITMAN SYSTEM INTEGRITY OCTOBER 38 080.33746 22 INSTALL 151 FEET OF 4 INCH POLY IN AN ALLEY AND ABANDON 151 FEET OF 4 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER 39 080.33776 60 INSTALL 850 FEET OF 4 INCH POLY ALONG CLARKSVILLE STREET AND ABANDON 850 FEET OF 3 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER 40 080.33798 597 INSTALL 10 FEET OF 10 INCH STEEL ALONG EDGEWOOD STREET AND ABANDON 10 FEET OF 10 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 41 080.33801 24 INSTALL 130 FEET OF 2 INCH POLY ALONG PEARL STREET AND ABANDON 128 FEET OF 2 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 42 080.33840 29 INSTALL 470 FEET OF 2 INCH POLY ALONG 8TH STREET AND ABANDON 470 FEET ON 1.75 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEGARGEL SYSTEM INTEGRITY OCTOBER 43 080.33842 377 INSTALL 150 FEET OF 4 INCH POLY IN MYRTLE STREET AND ABANDON 150 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER 44 080.33844 129 INSTALL 182 FEET OF 2 INCH POLY ALONG US HIGHWAY 380 AND ABANDON 182 FEET OF 3 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY OCTOBER 45 080.33849 311 ABANDON 130 FEET OF 2 INCH STEEL ALONG GRACE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 46 080.33870 40 INSTALL 118 FEET OF 4 INCH POLY ALONG 11TH STREET AND ABANDON 110 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 47 080.33900 291 INSTALL 360 FEET OF 4 INCH POLY IN AN ALLEY AND ABANDON 360 FEET OF 4 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY OCTOBER 48 080.33906 18 INSTALL 229 FEET OF 2 INCH POLY ALONG COLQUITT STREET AND ABANDON 246 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 49 080.33907 216 INSTALL 325 FEET OF 2 INCH POLY ON LOOP 254 AND ABANDON 325 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER SYSTEM INTEGRITY OCTOBER 50 080.33909 345 INSTALL 400 FEET OF 2 INCH POLY ALONG LOOP 3363 AND ABANDON 400 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLDEN SYSTEM INTEGRITY OCTOBER 51 080.33951 119 INSTALL 545 FEET OF 2 INCH POLY ALONG MILLS STREET AND ABANDON 975 FEET OF 3 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HUTCHINS SYSTEM INTEGRITY OCTOBER 52 080.33979 283 INSTALL 200 FEET OF 4 INCH POLY ALONG 9TH STREET AND ABANDON 200 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY OCTOBER 53 080.33981 32 INSTALL 265 FEET OF 4 INCH POLY IN AN ALLEY EAST OF ELM STREET AND ABANDON 265 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 54 080.34037 113 INSTALL 230 FEET OF 2 INCH POLY ON EAST HOUSTON STREET AND ABANDON 230 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COOPER SYSTEM INTEGRITY OCTOBER 55 080.34048 17 INSTALL 165 FEET OF 6 INCH AND 117 FEET OF 3 INCH POLY ALONG AMBLER AVENUE AND ABANDON 165 FEET OF 6 INCH AND 117 FEET OF 3 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 56 080.34070 85 INSTALL 145 FT OF 4 INCH POLY AT METCALF AND HIGHLAND AND ABANDON 145 FT OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 57 080.34087 70 INSTALL 100 FEET OF 4 INCH POLY IN A PUBLIC UTILITY EASEMENT AND ABANDON 100 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY OCTOBER 58 080.34091 295 INSTALL 90 FEET OF 6 INCH AND 32 FEET OF 4 INCH POLY AT THE INTERSECTION OF 20TH STREET AND 11TH AVENUE AND ABANDON 90 FEET OF 6 INCH AND 32 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 59 080.34136 67 INSTALL 143 FT OF 2 IN POLY ON STRATFORD AND ABANDON 150 FEET OF 1.25 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 60 080.34137 21 INSTALL 185 FEET OF 2 INCH POLY AT BANK AND PENN STREETS AND ABANDON 110 FEET OF 3 INCH AND 75 FEET OF 2 STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY OCTOBER 61 080.34143 380 INSTALL 1040 FEET OF 4 INCH POLY IN AN ALLEY AND ABANDON 905 FEET OF 3 INCH CAST IRON, 121 FEET OF 3 INCH AND 15 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 62 080.34146 273 INSTALL 237 FEET OF 2 INCH POLY ALONG 2ND STREET AND ABANDON 235 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY OCTOBER 63 080.34175 332 INSTALL 155 FEET OF 3 INCH POLY ALONG MCCRACKEN STREET AND ABANDON 155 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHICO SYSTEM INTEGRITY OCTOBER 64 080.34176 159 INSTALL 300 FEET OF 2 INCH STEEL ALONG ELM STREET AND ABANDON 300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALVORD SYSTEM INTEGRITY OCTOBER 65 080.34177 628 INSTALL 625 FEET OF 2 INCH POLY ALONG SEALY STREET AND ABANDON 625 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JUSTIN SYSTEM INTEGRITY OCTOBER 66 080.34187 286 INSTALL 1220 FEET OF 4 INCH POLY ALONG VARIOUS STREETS AND ABANDON 1850 FEET OF 4 INCH AND 125 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALVERT SYSTEM INTEGRITY OCTOBER 67 080.34188 1,407 INSTALL 2100 FEET OF 4 INCH POLY IN ALLEY BETWEEN NORTH ELM AND NORTH CRUMP AND ABANDON 2100 FEET OF 2.5 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 68 080.34208 680 INSTALL 800 FEET OF 4 INCH POLY ALONG 15TH STREET AND ABANDON 800 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HONEY GROVE SYSTEM INTEGRITY OCTOBER 69 080.34210 239 INSTALL 305 FEET OF 2 INCH POLY ALONG NORTH REAGAN STREET AND ABANDON 456 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST SYSTEM INTEGRITY OCTOBER 70 080.34228 583 INSTALL 710 FEET OF 2 INCH POLY AND ABANDON 710 FEET OF 4 INCH OF STEEL PIPE DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORNEY SYSTEM INTEGRITY OCTOBER 71 080.34251 73 INSTALL 50 FEET OF 4 INCH POLY ALONG MILLS STREET AND ABANDON 50 FEET OF 3 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 72 080.34286 151 INSTALL 356 FEET OF 2IN POLY IN THE ALLEY NORTH OF FOURTH ST AT AVE E AND ABANDON 356 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS KNOX CITY SYSTEM INTEGRITY OCTOBER 73 080.34294 786 INSTALL 1350 FEET OF 2 INCH POLY IN AN ALLEY AND ABANDON 1350 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY OCTOBER MTX Additions Page 2 of 178 221 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 74 080.34320 33 INSTALL 460 FT OF 2 IN POLY AT WENONAH AND SEYMOUR AND ABANDON 360 FEET OF 4 INCH STEEL AND 50 FEET OF 4 INCH AND 50 FEET OF 2 INCH POLY DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 75 080.34326 210 ABANDON 40 FEET OF 2 INCH STEEL ALONG EDDIE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER 76 080.34395 109 INSTALL 485 FEET OF 2 INCH POLY ALONG 2ND STREET AND ABANDON 485 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BAIRD SYSTEM INTEGRITY OCTOBER 77 080.34402 206 ABANDON 932 FEET OF 2 INCH STEEL IN AN EASEMENT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY OCTOBER 78 080.34403 151 ABANDON 203 FEET OF 2 INCH STEEL ALONG ADAMS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STRAWN SYSTEM INTEGRITY OCTOBER 79 080.34417 240 INSTALL 215 FEET OF 2 INCH POLY ALONG NORTHWEST HIGHWAY AND ABANDON 2OO FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 80 080.34432 305 INSTALL 160 FEET OF 2 INCH POLY ALONG ANDERSON STREET AND ABANDON 950 FEET OF 2 INCH CAST IRON DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 81 080.34470 82 INSTALL 288 FEET OF 2 INCH POLY ALONG HILL ST AND ABANDON 288 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY SYSTEM INTEGRITY OCTOBER 82 080.34491 96 INSTALL 5 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY IN AN ALLEY AND ABANDON 5 FEET OF 4 INCH AND 10 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY OCTOBER 83 080.34502 562 INSTALL 1250 FEET OF 2 INCH POLY ALONG EAST PARK AND ABANDON 1250 FEET OF 24 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 84 080.34508 65 INSTALL 30 FEET OF 8 INCH POLY ALONG BROTHERS BLVD AND ABANDON 12 FEET OF 8 INCH STEEL AND 18 FEET OF 8 INCH POLY DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY OCTOBER 85 080.34520 498 INSTALL 270 FEET OF 4 INCH POLY ALONG WALNUT AND NEW STREETS AND ABANDON 254 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 86 080.34532 31 INSTALL 1240 FEET OF 2 INCH POLY IN AN ALLEY AND ABANDON 1240 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 87 080.34543 73 INSTALL 450 FEET OF 2 INCH POLY ALONG 6TH STREET AND ABANDON 450 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORMANGEE SYSTEM INTEGRITY OCTOBER 88 080.34555 128 INSTALL 265 FEET OF 2 INCH POLY ALONG13TH STREET AND ABANDON 265 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HASKELL SYSTEM INTEGRITY OCTOBER 89 080.34560 617 INSTALL 1260 FEET OF 2 INCH POLY ALONG 24TH STREET AND ABANDON 1255 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 90 080.34562 204 INSTALL 405 FEET OF 2 INCH POLY ALONG 3RD STREET AND ABANDON 405 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 91 080.34579 360 INSTALL 428 FEET OF 6 INCH, 23 FEET OF 3 INCH AND 16 FEET OF 2 INCH POLY ALONG 23RD STREET AND ABANDON 428 FEET OF 6 INCH, 23 FEET OF 3 INCH AND 16 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER 92 080.34704 12 INSTALL 142 FEET OF 3 INCH POLY ALONG 7TH AND ABANDON 142 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 93 080.34729 53 INSTALL 150 FEET OF 4 INCH POLY ALONG COLORADO STREET AND ABANDON 150 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY OCTOBER 94 080.34737 672 INSTALL 100 FEET OF 6 INCH POLY ALONG JEFFERSON STREET AND ABANDON 100 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY OCTOBER 95 080.34741 9 INSTALL 315 FEET OF 4 INCH POLY IN AN ALLEY AND ABANDON 315 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY OCTOBER 96 080.34745 108 INSTALL 107 FEET OF 4 INCH POLY IN AN ALLEY AND ABANDON 107 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 97 080.34747 153 INSTALL 120 FEET OF 2 INCH POLY ALONG COUNTRY CLUB ROAD AND ABANDON 70 FEET OF 2 INCH STEEL AND 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 98 080.34753 112 ABANDON 256 FEET OF 2 INCH STEEL AT 5TH AND BROWN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURKBURNETT SYSTEM INTEGRITY OCTOBER 99 080.34776 7 INSTALL 175 FEET OF 2 INCH POLY ALONG WILDWOOD STREET AND ABANDON 175 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY OCTOBER 100 080.34785 82 INSTALL 250 FEET OF 2 INCH POLY ALONG TELLERSON AND ABANDON 1570 FEET OF 1,25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 101 080.34862 138 INSTALL 488 FEET OF 1.25 INCH POLY ALONG CR 357 AND ABANDON 476 FEET OF 1 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLANKET SYSTEM INTEGRITY OCTOBER 102 080.34866 123 INSTALL 339 FEET OF 2 INCH POLY AND ABANDON 317 FEET OF 1 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLANKET SYSTEM INTEGRITY OCTOBER 103 080.34881 307 INSTALL 300 FEET OF 6 INCH POLY ALONG 28TH STREET AND ABANDON 300 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 104 080.34960 166 ABANDON 95 FEET OF 2 INCH STEEL ALONG BROWNING STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEYMOUR SYSTEM INTEGRITY OCTOBER 105 080.34982 185 INSTALL 397 FEET OF 2 INCH POLY IN AN ALLEY AND ABANDON 397 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 106 080.34994 590 INSTALL 200 FEET OF 4 INCH AND 120 FEET OF 2 INCH POLY IN AN ALLEY AND ABANDON 200 FEET OF 4 INCH AND 120 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY OCTOBER 107 080.34998 134 INSTALL 51 FEET OF 2 INCH POLY AT HACKBERRY AND 20TH STREET AND ABANDON 920 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 108 080.35032 219 INSTALL 150 FEET OF 4 INCH POLY ALONG BALCH SPRINGS ROAD AND ABANDON 150 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY OCTOBER 109 080.35156 82 INSTALL 148 FEET OF 2 INCH POLY AND ABANDON 148 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER 110 080.35164 53 INSTALL 275 FEET OF 2 INCH POLY IN AN ALLEY AND ABANDON 275 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANSON SYSTEM INTEGRITY OCTOBER 111 080.35180 5 ABANDON 425 FEET OF 4 INCH STEEL ALONG BURNETT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALVERT SYSTEM INTEGRITY OCTOBER 112 080.35242 20 INSTALL 334 FEET OF 2 INCH POLY ALONG BROYLES AND ABANDON 334 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURKBURNETT SYSTEM INTEGRITY OCTOBER 113 080.35255 62 INSTALL 1071 FEET OF 1.25 INCH POLY ALONG CR 357 AND ABANDON 1071 FEET OF 1 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLANKET SYSTEM INTEGRITY OCTOBER MTX Additions Page 3 of 178 222 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 114 080.38117 0 INSTALL 1235 FEET OF 4 INCH AND 65 FEET OF 2 INCH POLY NEAR RUTH LANE AND ABANDON 1235 FEET OF 4 INCH AND 65 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 115 080.41066 2,558 INSTALL 8100 FEET OF 24 INCH STEEL ALONG IRVING BOULEVARD AND ABANDON 8100 FEET OF 24 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER 116 080.41157 (312) INSTALL 249 POLY SERVICE LINES IN THE SOUTHWEST REGION, FT. WORTH AREA AND ABANDON 249 STEEL SERVICE LINES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 117 080.41874 0 RELOCATE FACILITIES. INSTALL 30 FEET OF 6 INCH STEEL, 1465 FEET OF 8 INCH, 397 FEET OF 4 INCH AND 186 FEET OF 2 INCH POLY AND ABANDON 1460 FEET OF 6 INCH, 850 FEET OF 4 INCH, AND 430 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES SEPTEMBER 118 080.43732 170 INSTALL 1228 FEET OF POLY ALONG PIERCE AND ABANDON 1228 FEET STEEL AND 72 FEET OF POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY OCTOBER 119 080.45245 0 INSTALL 1720 FEET OF 2 INCH POLY ALONG WORTH STREET AND ABANDON 1720 FEET OF 4 INCH AND 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 120 080.45509 (0) INSTALL 800 FEET OF 12 INCH POLY ALONG FM 1417 AND ABANDON 800 FEET OF 12 INCH STEEL ALONG FM 1417 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER 121 080.45614 0 INSTALL 1650 FEET OF 2 INCH POLY ALONG VICTOR STREET AND ABANDON 1650 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 122 080.45638 (46,996) RELOCATE FACILITIES. INSTALL 41 FEET OF 6 INCH, 37 FEET OF 8 INCH, 30 FEET OF 10 INCH AND 4409 FEET OF 16 INCH STEEL AND ABANDON 237 FEET OF 6 INCH, 787 FEET OF 8 INCH, 30 FEET OF 10 INCH, 170 FEET OF 12 INCH AND 3396 FEET OF 16 INCH STEEL ALONG EAST AVENUE H TO ACCOMMODATE TXDOT STREET PROJECT. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES MAY 123 080.45658 2 INSTALL 1227 FEET OF 12 INCH STEEL, 80 FEET OF 2 INCH AND 284 FEET OF 4 INCH POLY ALONG LIVE OAK AND ABANDON 61 FEET OF 2 INCH, 1281 FEET OF 12 INCH STEEL, 300 FEET OF 3 INCH AND 162 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 124 080.45700 2 INSTALL 335 FEET OF 6 INCH AND 425 FEET OF 4 INCH POLY ALONG GLENCO TERRACE AND ABANDON 169 FEET OF 3 INCH POLY, 256 FEET OF 4 INCH CAST IRON, AND 335 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 125 080.46065 1 INSTALL 1000 FEET OF 2 INCH POLY ALONG WINDSOR PARKWAY AND ABANDON 1000 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER 126 080.46146 5 RELOCATE FACILITIES. INSTALL 125 FEET OF 6 INCH, 250 FEET OF 4 INCH, 2920 FEET OF 2 INCH POLY ALONG YEWPON AND ABANDON 90 FEET OF 6 INCH, 215 FEET OF 4 INCH, 2700 FEET OF 2 INCH STEEL AND 120 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 127 080.46447 5,766 INSTALL 3500 FEET OF 24 INCH STEEL ALONG SH114 AND ABANDON 3500 FEET OF 24 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER 128 080.47046 11,979 RELOCATE FACILITIES. INSTALL 248 FEET OF 2 INCH POLY AND 351 FEET OF 4 INCH POLY AND 5045 FEET OF 6 INCH POLY AND ABANDON 294 FEET OF 2 INCH POLY AND 3474 FEET OF 4 INCH STEEL AND 1847 FEET OF 4 INCH POLY ALONG WHITE CHAPEL BOULEVARD TO ACCOMMODATE CITY OF SOUTHLAKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE RELOCATION OF FACILITIES OCTOBER 129 080.47061 0 RELOCATE FACILITIES. INSTALL 2600 FEET OF 12 INCH STEEL, 75 FEET OF 6 INCH, 250 FEET OF 4 INCH, AND 100 FEET OF 2 INCH POLY ALONG MONTGOMERY STREET AND ABANDON 104 FEET OF 2 INCH AND 64 FEET OF 4 INCH POLY AND 2623 FEET OF 12 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 130 080.47079 0 INSTALL 1700 FEET OF 2 INCH POLY ALONG TARPLEY AVENUE AND ABANDON 1200 FEET OF 3 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COCKRELL HILL SYSTEM INTEGRITY SEPTEMBER 131 080.47303 0 RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH AND 2230 FEET OF 2 INCH POLY ALONG SAN JACINTO AND ABANDON 470 FEET OF 6 INCH AND 2260 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 132 080.47311 97 RELOCATE FACILITIES. INSTALL 3630 FEET OF 2 INCH POLY ALONG ROYALTON AND ABANDON 3625 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 133 080.47445 6 RELOCATE FACILITIES. INSTALL 220 FEET OF 4 INCH AND 1930 FEET OF 2 INCH POLY ALONG NECHES AND ABANDON 645 FEET OF 4 INCH POLY AND 1350 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 134 080.47446 0 RELOCATE FACILITIES. INSTALL 1985 FEET OF 4 INCH AND 1950 FEET OF 2 INCH POLY ALONG EWING AND ABANDON 1410 FEET OF 6 INCH STEEL, 420 FEET OF 8 INCH CAST IRON, 40 FEET OF 4 INCH CAST IRON, AND 155 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 135 080.47600 54 INSTALL 1050 FEET OF 2 INCH POLY ALONG ASH AVENUE AND ABANDON 1050 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 136 080.47601 8 INSTALL 1900 FEET OF 2 INCH POLY AND ABANDON 1900 FEET OF 4 INCH CAST IRON ALONG HENDERSON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 137 080.47603 54 INSTALL 1588 FEET OF 2 INCH POLY ALONG HENDERSON AVENUE AND ABANDON 1536 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 138 080.47605 43 INSTALL 1150 FEET OF 2 INCH POLY ALONG HENDERSON AVENUE AND ABANDON 1150 FEET OF CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 139 080.47606 69 INSTALL 800 FEET OF 2 INCH POLY ALONG HENDERSON AVENUE AND ABANDON 875 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 140 080.47607 293 ABANDON 3200 FEET OF 6 AND 8 INCH CAST IRON ALONG HENDERSON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 141 080.47681 31 INSTALL 1136 FEET OF 2 INCH POLY ALONG ASH AND ABANDON 1245 FEET OF 4 INCH AND 375 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 142 080.47682 63 INSTALL 2200 FEET OF 2 INCH POLY ALONG TERRY AND ABANDON 3550 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 143 080.47848 2 INSTALL 1450 FEET OF 2 INCH POLY ALONG BROOKLYNDELL STREET AND ABANDON 1030 FEET OF 2 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 144 080.47850 2 INSTALL 1850 FEET OF 2 INCH POLY ALONG BARNETT AVENUE AND ABANDON 650 FEET OF 4 INCH AND 1200 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 4 of 178 223 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 145 080.47857 4 INSTALL 1500 FEET OF 2 INCH POLY ALONG MARSHALL DELL AVENUE AND ABANDON 1200 FEET OF CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 146 080.47894 (67) INSTALL 5 GRADIENT CONTROL MATS, 2000 FEET OF ZINC RIBBON, 10 TEST STATIONS AND 2 DEEP GROUNDING POINTS TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY OCTOBER 147 080.48010 0 INSTALL 450 FEET OF 2 INCH POLY ALONG JETER STREET AND ABANDON 50 FEET OF 2 INCH AND 380 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MABANK SYSTEM INTEGRITY SEPTEMBER 148 080.48093 360,820 INSTALL 20842 FEET OF 8 INCH AND 27 FEET OF 4 INCH POLY ALONG COUNTY ROAD 269 DUE TO CUSTOMER GROWTH. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LEANDER GROWTH SEPTEMBER 149 080.48110 1 INSTALL DISTRICT REGULATOR STATION AND 4800 FEET OF 12 INCH STEEL ALONG BALLARD DRIVE AND ABANDON DISTRICT REGULATOR STATION AND 4800 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WYLIE SYSTEM INTEGRITY SEPTEMBER 150 080.48519 1 RELOCATE FACILITIES. INSTALL 3080 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG MERIDA AND ABANDON 2915 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 151 080.48572 0 RELOCATE FACILITIES. INSTALL 1920 FEET OF 2 INCH POLY ALONG AIRLINE STREET AND ABANDON 1830 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 152 080.48583 0 RELOCATE FACILITIES. INSTALL 200 FEET OF 8 INCH AND 250 FEET OF 2 INCH POLY ALONG LAURENCE DRIVE AND ABANDON 190 FEET OF 3 INCH STEEL TO ACCOMMODATE TXDOT ROAD AND DRAINAGE IMPROVEMENTS PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEATH RELOCATION OF FACILITIES SEPTEMBER 153 080.48651 0 INSTALL 1000 FEET OF 4 INCH POLY ALONG WASHINGTON AND ABANDON 900 FEET OF 4 INCH CAST IRON AND 20 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 154 080.48677 0 RELOCATE FACILITIES. INSTALL 1685 FEET OF 6 INCH 250 FEET OF 4 INCH 660 FEET OF 2 INCH POLY ALONG DEVITT STREET AND ABANDON 1430 FEET OF 6 INCH CAST IRON TO ACCOMMODATE FORT WORTH ROADWAY PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 155 080.48741 0 RELOCATE FACILITIES. INSTALL 1600 FEET OF 4 INCH POLY ALONG UNIVERSITY AND ABANDON 2525 FEET OF 6 INCH CAST IRON AND 1250 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 156 080.48743 0 RELOCATE FACILITIES. INSTALL 340 FEET OF 4 INCH POLY ALONG BECKLEY AVENUE AND ABANDON 450 FEET OF 8 INCH AND 550 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS PAVING AND DRAINAGE IMPROVEMENTS PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 157 080.48782 0 RELOCATE FACILITIES. INSTALL 1960 FEET OF 6 INCH, 585 FEET OF 4 INCH, AND 980 FEET OF 2 INCH POLY ALONG COLLEGE AND ABANDON 1245 FEET OF 8 INCH, 580 FEET OF 6 INCH, AND 1050 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 158 080.48800 83 RELOCATE FACILITIES. INSTALL 4,160 FEET OF 8 INCH, 165 FEET OF 4 INCH, AND 1320 FEET OF 3 INCH POLY ALONG ABRAM STREET AND ABANDON 1,400 FEET OF 8 INCH, 1,760 FEET OF 4 INCH, 620 FEET OF 2 INCH STEEL, AND 1,830 FEET OF 2 INCH AND 50 FEET OF 4 INCH POLY TOACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 159 080.48844 1 INSTALL 2375 FEET OF 2 INCH POLY ALONG COCHRAN AND ABANDON 2375 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 160 080.48847 5 INSTALL 2865 FEET OF 2 AND 4 INCH POLY ALONG EUCLID AND ABANDON 3375 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY SEPTEMBER 161 080.48957 38,092 INSTALL 7982 FEET OF 8 INCH POLY ALONG BAGDAD ROAD DUE TO CUSTOMER GROWTH. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LEANDER GROWTH JANUARY 162 080.49082 1 RELOCATE FACILITIES. INSTALL 30 FEET OF 6 INCH POLY, 30 FEET OF 6 INCH STEEL, 275 FEET OF 4 INCH POLY, AND 250 FEET OF 2 INCH POLY ALONG SPRING VALLEY AND ABANDON 25 FEET OF 6 INCH, 1175 FEET OF 6 INCH AND 1130 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES SEPTEMBER 163 080.49145 1,041,210 INSTALL 531 FEET OF 12 INCH STEEL AND 14467 FEET OF 24 INCH STEEL AND ABANDON 215 FEET OF 6 INCH STEEL AND 14800 FEET OF 24 INCH STEEL ALONG STREETS OF MOCKINGBIRD STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 164 080.49148 4,653 INSTALL 11,500 FEET OF 24 INCH STEEL ALONG DT3 AT MOCKINGBIRD AND ABANDON 8,895 FEET OF 24 INCH AND 3,900 FEET OF 20 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 165 080.49174 1 RELOCATE FACILITIES. INSTALL 755 FEET OF 4 INCH POLY ALONG ROSEDALE STREET AND ABANDON 638 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 166 080.49273 3 INSTALL 1025 FEET OF 6 INCH POLY AND ABANDON 205 FEET OF 4 INCH POLY AND 400 FEET OF 6 INCH CAST IRON ALONG HARVARD AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY SEPTEMBER 167 080.49313 1,856 INSTALL 1815 FEET OF 6 INCH, 2113 FEET OF 4 INCH, AND 7753 FEET OF 2 INCH POLY ALONG THE STREETS OF WOLF RANCH PH 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH NOVEMBER 168 080.49441 1 RELOCATE FACILITIES. INSTALL 3394 FEET OF 4 INCH POLY ALONG HARDEMAN STREET AND ABANDON 2100 FEET OF 4 INCH CAST IRON AND 1100 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 169 080.49469 1 INSTALL 1735 FEET OF 2 INCH POLY ALONG ARMSTRONG AVENUE AND ABANDON 1735 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY SEPTEMBER 170 080.49480 0 RELOCATE FACILITIES. INSTALL 1100 FEET OF 2 INCH POLY ALONG CLINTON AVENUE AND ABANDON 1040 FEET OF 6 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 171 080.49578 0 RELOCATE FACILITIES. INSTALL 1260 FEET OF 4 INCH POLY ALONG NOLAN STREET AND ABANDON 1260 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 172 080.49593 5 INSTALL 178 STEEL SERVICES AND ABANDON 178 STEEL SERVICES WITHIN MAPSHEET #04-03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER 173 080.49658 (9,000) INSTALL 1540 FEET OF 4 INCH AND 2344 FEET OF 2 INCH POLY ALONG STREETS OF SIENA PHASES 4 & 5. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH JANUARY 174 080.49679 2 RELOCATE FACILITIES. INSTALL (51) 0.75 POLY SERVICES ALONG EDGEWOOD TERRACE AND ABANDON (51) 0.75 STEEL SERVICES TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER MTX Additions Page 5 of 178 224 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 175 080.49765 0 RELOCATE FACILITIES. INSTALL 1890 FEET OF 4 INCH POLY ALONG 36TH STREET AND ABANDON 1890 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 176 080.49860 0 INSTALL 960 FEET OF 2 INCH POLY ALONG BURSON AND ABANDON 600 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF LAKE WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 177 080.49910 0 RELOCATE FACILITIES. INSTALL 2486 FEET OF 2 INCH AND 63 FEET OF 4 INCH POLY ALONG COLONIAL STREET AND ABANDON 1240 FEET OF 4 INCH STEEL, AND 1128 FEET OF CAST IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 178 080.49979 0 RELOCATE FACILITIES. INSTALL 1765 FEET OF 4 INCH POLY ALONG GRANDBURY STREET AND ABANDON 1150 FEET OF 4 INCH, 60 FEET OF 3 INCH, 340 FEET OF 2 INCH STEEL, 50 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CLEBURNE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE RELOCATION OF FACILITIES SEPTEMBER 179 080.49984 1 RELOCATE FACILITIES. INSTALL 175 FEET OF 2 INCH, 1850 FEET OF 4 INCH, 210 FEET OF 6 INCH POLY ALONG MEADOW LANE AND ABANDON 65 FEET OF 2 INCH, 265 FEET OF 3 INCH, 1635 FEET OF 4 INCH, 85 FEET OF 6 INCH STEEL, 95 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 180 080.49985 1 INSTALL 1300 FEET OF 2 INCH POLY AND ABANDON 1300 FEET OF 2 INCH STEEL ALONG GREENFIELD ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 181 080.50060 0 RELOCATE FACILITIES. INSTALL 450 FEET OF 4 INCH POLY ALONG AUSTIN STREET AND ABANDON 40 FEET OF 3 INCH CAST IRON AND 400 FT OF 4 INCH STEEL TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES SEPTEMBER 182 080.50109 0 RELOCATE FACILITIES. INSTALL 830 FEET OF 6 INCH, 221 FEET OF 4 INCH, 96 FEET OF 2 INCH POLY AND ABANDON 1070 FEET OF 6 INCH, 422 FEET OF 2 INCH, AND 188 FEET OF 4 INCH POLY,375 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 183 080.50115 0 RELOCATE FACILITIES. INSTALL 2200 FEET OF 4 INCH AND 550 FEET OF 2 INCH POLY ALONG 9TH STREET AND ABANDON 560 FEET OF 2 INCH POLY AND 2775 FEET OF 4 INCH CAST IRON AND 130 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 184 080.50116 2 INSTALL 930 FEET OF 4 INCH POLY ALONG THACKERY AND ABANDON 1075 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER 185 080.50207 1 INSTALL 285 FEET OF 2 INCH POLY ALONG QUINET AND ABANDON 337 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEAGOVILLE SYSTEM INTEGRITY SEPTEMBER 186 080.50220 0 RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH, 60 FEET OF 4 INCH POLY AND ABANDON 240 FEET OF 3 INCH POLY AND 150 FEET OF 3 INCH STEEL ALONG LA CABEZA TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 187 080.50270 0 INSTALL 2060 FEET OF 4 INCH POLY ALONG WANETA AND ABANDON 2160 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 188 080.50331 1 RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY ALONG SKYLINE DRIVE AND ABANDON 700 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW DRAINAGE IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW RELOCATION OF FACILITIES SEPTEMBER 189 080.50416 0 RELOCATE FACILITIES. INSTALL 1600 FEET OF 2 INCH POLY ALONG THOMAS PLACE AND ABANDON 1315 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 190 080.50420 1 INSTALL 1415 FEET OF 6 INCH, 255 FEET OF 4 INCH, AND 385 FEET OF 2 INCH POLY ALONG CARROLL AND ABANDON 1415 FEET OF 6 INCH, 255 FEET OF 4 INCH CAST IRON AND 385 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 191 080.50421 1 RELOCATE FACILITIES. INSTALL (77) 0.75 INCH SERVICES ALONG HILL STREET AND ABANDON (77) 0.75 INCH SERVICES TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 192 080.50422 0 RELOCATE FACILITIES. INSTALL 1200 FEET OF 2 INCH POLY ALONG EWING AND ABANDON 1410 FEET OF 6 INCH STEEL, 420 FEET OF 8 INCH, 40 FEET OF 4 INCH CAST IRON, 155 FEET OF 6 INCH POLY, 105 FEET OF 6 INCH STEEL, 450 FEET OF 4 INCH STEEL, 775 FEET OF 6 INCH, 550 FEET OF 4 INCH AND 100 FEET OF 3 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 193 080.50424 1 RELOCATE FACILITIES. INSTALL (7) 0.75 INCH POLY SERVICES ALONG AIRLINE STREET AND ABANDON 1830 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 194 080.50425 0 INSTALL 800 FEET OF 2 INCH POLY ALONG BELCLAIRE AVENUE AND ABANDON 2600 FEET OF 6 INCH AND 725 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 195 080.50454 0 INSTALL 550 FEET OF 2 INCH POLY ALONG ARDEN PLACE AND ABANDON 425 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 196 080.50497 0 INSTALL 400 FEET OF 2 INCH POLY HALL STREET AND ABANDON 400 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEAGOVILLE SYSTEM INTEGRITY SEPTEMBER 197 080.50504 1 RELOCATE FACILITIES. INSTALL (27) 0.75 INCH POLY SERVICES ALONG HARWEN TERRACE AND ABANDON (27) POLY SERVICES TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 198 080.50529 2 RELOCATE FACILITIES. INSTALL 98 POLY SERVICES AND ABANDON 98 STEEL SERVICES ALONG ROSEDALE STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 199 080.50635 1 INSTALL (20) 0.75 POLY SERVICES ALONG MINKS DRIVE AND ABANDON (20) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY SEPTEMBER 200 080.50659 0 RELOCATE FACILITIES. INSTALL 960 FEET OF 2 INCH POLY ALONG BURSON AND ABANDON 600 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF LAKE WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH RELOCATION OF FACILITIES SEPTEMBER 201 080.50662 0 INSTALL (36) 0.75 INCH POLY SERVICES ALONG EISENHOWER AND ABANDON (36) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 202 080.50668 0 INSTALL 910 FEET OF 4 INCH POLY ALONG DRIESS STREET AND ABANDON 916 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 203 080.50681 0 RELOCATE FACILITIES. INSTALL 1633 FEET OF 4 INCH POLY ALONG 16TH STREET AND ABANDON 1308 FEET OF 4 INCH, 162 FEET OF 6 INCH, AND 72 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORTH WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER MTX Additions Page 6 of 178 225 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 204 080.50717 0 RELOCATE FACILITIES. INSTALL 305 FEET OF 4 INCH, 15 FEET OF 2 INCH POLY ALONG MAY STREET AND ABANDON 837 FEET OF 4 INCH STEEL AND 150 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 205 080.50727 0 RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH AND 300 FEET OF 2 INCH POLY ALONG NW 15TH STREET AND ABANDON 90 FEET OF 4 INCH CAST IRON, 170 FEET OF 4 INCH, 111 FEET OF 2 INCH STEEL AND 111 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 206 080.50745 3 RELOCATE FACILITIES. INSTALL 240 FEET OF 2 INCH, 120 FEET OF 3 INCH, AND 60 FEET OF 4 INCH POLY ALONG FOREST HILL DRIVE AND ABANDON 220 FEET OF 2 INCH, 100 FEET OF 3 INCH, AND 50 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL RELOCATION OF FACILITIES SEPTEMBER 207 080.50753 2 INSTALL 870 FEET OF 2 INCH POLY ALONG SMALL STREET AND ABANDON 870 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER 208 080.50796 0 RELOCATE FACILITIES. INSTALL 560 FEET OF 4 INCH, 109 FEET OF 2 INCH POLY ALONG SPRINGDALE ROAD AND ABANDON 397 FEET OF 4 INCH, 95 FEET OF 2 INCH, 50 FEET OF 3 INCH STEEL, AND 161 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 209 080.50819 0 INSTALL 3230 FEET OF 8 INCH, 10 FEET OF 6 INCH, 725 FEET OF 4 INCH, 50 FEET OF 2 INCH POLY AND ABANDON 310 FEET OF 4 INCH, 1155 FEET OF 8 INCH, 1235 FEET OF 12 INCH, 1180 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 210 080.50830 1 RELOCATE FACILITIES. INSTALL (19) 0.75 INCH POLY SERVICES ALONG SURREY DRIVE AND ABANDON (19) 0.75 INCH SERVES TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 211 080.50838 0 RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY ALONG VAN NATTA LANE AND ABANDON 200 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 212 080.50847 0 INSTALL 854 FEET OF 2 INCH POLY ALONG FORT WORTH AVENUE AND ABANDON 854 FEET 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 213 080.50867 3 INSTALL 2200 FEET OF 4 INCH AND 500 FEET OF 2 INCH POLY ALONG PACIFIC AND ABANDON 1800 FEET OF 4 INCH, 400 FEET OF 6 INCH AND 460 FEET OF 2 INCH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY SEPTEMBER 214 080.50903 0 INSTALL 1750 FEET OF 2 INCH AND 560 FEET OF 4 INCH POLY ALONG SOUTHWOOD AND ABANDON 1138 FEET OF 4 INCH AND 1172 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 215 080.50939 0 RELOCATE FACILITIES. INSTALL 4200 FEET OF 2 INCH POLY ALONG FITZHUGH AVENUE AND ABANDON 3063 FEET OF 4 INCH CAST IRON AND 159 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 216 080.50975 2 INSTALL 525 FEET OF 2 INCH, 1210 FEET OF 4 INCH POLY AND ABANDON 2940 FEET OF 4 INCH CAST IRON, 380 FEET OF 4 INCH POLY ALONG JEFFERSON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 217 080.50986 0 RELOCATE FACILITIES. INSTALL 176 FEET OF 2 INCH POLY ALONG KENLEY STREET AND ABANDON 176 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 218 080.51003 0 INSTALL 1200 FEET OF 4 INCH POLY ALONG MELBA STREET AND ABANDON 1100 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 219 080.51004 0 RELOCATE FACILITIES. INSTALL (8) 0.75 INCH POLY SERVICES ALONG WINIFRED DRIVE AND ABANDON (8) POLY SERVICES TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 220 080.51005 0 RELOCATE FACILITIES. INSTALL 270 FEET OF 2 INCH POLY ALONG WONDER DRIVE AND ABANDON 270 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 221 080.51025 9,124 INSTALL 2923 FEET OF 2 INCH AND 1042 FEET OF 6 INCH POLY ALONG THE STREETS OF TIMBER CREEK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH MAY 222 080.51030 2 RELOCATE FACILITIES. INSTALL 937 FEET OF 6 INCH, 567 FEET OF 4 INCH POLY AND ABANDON 920 FEET OF 6 INCH STEEL, 690 FEET OF 4 INCH CAST IRON ALONG SYLVANIA TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 223 080.51033 0 RELOCATE FACILITIES. INSTALL 1141 FEET OF 4 INCH POLY, 33 0.75 INCH POLY SERVICES ALONG LILLIAN STREET AND ABANDON 1098 FEET OF 4 INCH CAST IRON, 750 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 224 080.51034 0 RELOCATE FACILITIES. INSTALL 1182 FEET OF 4 INCH POLY AND ABANDON 1393 FEET OF 4 INCH CAST IRON, 257 FEET OF 4 INCH POLY AND 347 FEET OF 6 INCH POLY ALONG DELL STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 225 080.51041 0 INSTALL 2340 FEET OF 2 INCH POLY ALONG TREMONT AND ABANDON 580 FEET OF 6 INCH CAST IRON, 1610 FEET OF 4 INCH CAST IRON, 360 FEET OF 4 INCH CAST IRON, 380 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 226 080.51053 5 RELOCATE FACILITIES. INSTALL 1320 FEET OF 4 INCH AND 560 FEET OF 2 INCH POLY ALONG DAVIS STREET AND ABANDON 1635 FEET OF 8 INCH, 320 FEET OF 6 INCH AND 250 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 227 080.51054 3 RELOCATE FACILITIES. INSTALL 1050 FEET OF 4 INCH, 640 FEET OF 2 INCH AND 60 FEET OF 8 INCH POLY AND ABANDON 1330 FEET OF 8 INCH, 50 FEET OF 6 INCH, 895 FEET OF 4 INCH CAST IRON, AND 50 FEET OF 8 INCH STEEL ALONG DAVIS STREET TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 228 080.51093 0 INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 229 080.51094 1 INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 230 080.51119 (4) INSTALL STEEL SERVICES IN BROWNWOOD AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER 231 080.51131 0 INSTALL METERS AND ABANDON METERS FOR USE IN NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER 232 080.51132 0 REPLACE AGING METERS WITHIN SOUTHWEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER 233 080.51133 0 INSTALL METERS AND ABANDON METERS FOR USE IN THE SOUTHEAST DISTRICT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 234 080.51134 0 INSTALL METERS AND ABANDON METERS FOR USE IN SOUTHEAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 7 of 178 226 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 235 080.51135 0 INSTALL METERS AND ABANDON METERS FOR USE IN THE SOUTHEAST SOUTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER 236 080.51136 0 INSTALL METERS AND ABANDON METERS FOR USE IN THE FORT WORTH DISTRICT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 237 080.51137 0 INSTALL METERS AND ABANDON METERS FOR USE IN SOUTHWEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY SEPTEMBER 238 080.51138 0 INSTALL METERS AND ABANDON METERS FOR USE IN SOUTHWEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 239 080.51142 507 RELOCATE FACILITIES. INSTALL 293 FEET OF 4 INCH, 807 FEET OF 6 INCH, 10 FEET OF 8 INCH AND 10320 FEET OF 12 INCH POLY ALONG CROWLEY ROAD AND ABANDON 2940 FEET OF 4 INCH, 2695 FEET OF 6 INCH AND 195 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 240 080.51158 0 RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY ALONG FATHOM DRIVE AND ABANDON 200 FEET OF 4 INCH , 100 FEET OF 2 INCH POLY AND 1 SERVICE LINE TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 241 080.51159 0 RELOCATE FACILITIES. INSTALL 840 FEET OF 2 INCH ALONG CINDY LANE AND ABANDON 610 FEET OF 2 INCH POLY, 230 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 242 080.51162 0 RELOCATE FACILITIES. INSTALL 850 FEET OF 2 INCH POLY ALONG DEXTER AND ABANDON 892 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 243 080.51171 0 RELOCATE FACILITIES. INSTALL 925 FEET OF 4 INCH, 150 FEET OF 2 INCH POLY ALONG CINDY LANE AND ABANDON 925 FEET OF 4 INCH, 150 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH FORTH WORTH ADDITIONS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 244 080.51176 2 RELOCATE FACILITIES. INSTALL 800 FEET OF 8 INCH ALONG OVERTON AND ABANDON 800 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 245 080.51220 30,993 RELOCATE FACILITIES. INSTALL 16 FEET OF 6 INCH, 11 FEET OF 8 INCH AND 12255 FEET OF 12 INCH STEEL ALONG LINE O1 AND ABANDON 2365 FEET OF 3 INCH, 6136 FEET OF 4 INCH, 3026 FEET OF 6 INCH AND 4980 FEET OF 8 INCH STEEL TO ACCOMMODATE PRIME POINTE DEVELOPMENT ALL CUSTOMERS LANCASTER RELOCATION OF FACILITIES DECEMBER 246 080.51221 0 INSTALL 900 FEET OF 2 INCH POLY ALONG IDAHO AND ABANDON 1080 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 247 080.51235 (0) RELOCATE FACILITIES. INSTALL 10,636 FEET OF 6 INCH, 394 FEET OF 4 INCH POLY AND ABANDON 10,636 FEET OF 6 INCH, 394 FEET OF 4 INCH POLY ALONG OVILLA ROAD TO ACCOMMODATE CITY OF DESOTO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OVILLA RELOCATION OF FACILITIES SEPTEMBER 248 080.51244 0 RELOCATE FACILITIES. INSTALL 200 FEET OF 8 INCH POLY ALONG GILLON AND ABANDON 200 FEET OF 8 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 249 080.51250 1 RELOCATE FACILITIES. INSTALL 840 FEET OF 6 INCH AND 200 FEET OF 4 INCH POLY ALONG LAFAYETTE AVENUE AND ABANDON 840 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 250 080.51255 1 INSTALL 625 FEET OF 2 INCH POLY ALONG SHELBY AND ABANDON 260 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 251 080.51263 0 INSTALL 1400 FEET OF 4 INCH POLY AND ABANDON 1400 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 252 080.51313 0 RELOCATE FACILITIES. INSTALL 1385 FEET OF 2 INCH POLY ALONG SELMA STREET AND ABANDON 1385 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 253 080.51317 1 RELOCATE FACILITIES. INSTALL 1642 FEET OF 2 INCH POLY ALONG ELINOR STREET AND ABANDON 1642 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 254 080.51318 1 RELOCATE FACILITIES. INSTALL 398 FEET OF 2 INCH, 1834 FEET OF 4 INCH POLY AND ABANDON 615 FEET OF 2 INCH, 1456 FEET OF 3 INCH STEEL ALONG HOLLIS STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 255 080.51332 0 INSTALL 965 FEET OF 2 INCH POLY AND (16) 0.75 INCH SERVICES ALONG BURTON AND ABANDON 739 FEET OF 4 INCH CAST IRON AND (16) 1.25 INCH SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 256 080.51371 5 INSTALL 6000 FEET OF 2 INCH POLY ALONG WEST 13TH AND ABANDON 6000 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER 257 080.51376 0 INSTALL 1875 FEET OF 4 INCH POLY, 15 POLY SERVICE LINES AND ABANDON 2990 FEET OF 3 INCH STEEL, 15 SERVICE LINES ALONG AVENUE E IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 258 080.51391 0 RELOCATE FACILITIES. INSTALL 756 FEET OF 2 INCH POLY ALONG BRITTAIN STREET AND ABANDON 760 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 259 080.51395 1 RELOCATE FACILITIES. INSTALL 1560 FEET OF 4 INCH POLY ALONG WILKES STREET AND ABANDON 1500 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES SEPTEMBER 260 080.51396 1 RELOCATE FACILITIES. INSTALL 305 FEET OF 2 INCH AND 105 FEET OF 6 INCH POLY ALONG ASHBURY DRIVE AND ABANDON 100 FEET OF 1-1/4 INCH, 80 FEET OF 2 INCH, AND 100 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 261 080.51405 1 RELOCATE FACILITIES. INSTALL 945 FEET OF 2 INCH POLY ALONG SOUTH ROBERTS AND ABANDON 945 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 262 080.51420 0 INSTALL 1510 FEET OF 2 INCH ALONG SYLVESTER AND ABANDON 1510 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 263 080.51421 1 INSTALL 1455 FEET OF 4 INCH POLY ALONG AFTON AND ABANDON 1075 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 264 080.51434 (0) INSTALL 3700 FEET OF 2 INCH POLY ALONG BUCKNELL AND ABANDON 3700 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 8 of 178 227 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 265 080.51451 0 RELOCATE FACILITIES. INSTALL 150 FEET OF 8 INCH, 65 FEET OF 6 INCH POLY, 75 FEET STEEL, 130 FEET OF 4 POLY, 125 FEET OF 2 INCH POLY AND ABANDON 125 FEET OF 2 INCH POLY, 65 FEET OF 6 INCH STEEL, 65 FEET OF 6 INCH, 130 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 266 080.51459 0 RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY ALONG DELEE STREET AND ABANDON 500 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES SEPTEMBER 267 080.51471 0 INSTALL 1000 FEET OF 2 INCH POLY ALONG RUTGER AND ABANDON 1000 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 268 080.51473 2 INSTALL 900 FEET OF 2 INCH AND 335 FEET OF 4 INCH POLY ALONG SOUTH VERSAILLES AND ABANDON 900 FEET OF CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY SEPTEMBER 269 080.51474 2 INSTALL 865 FEET OF 2 INCH AND 505 FEET OF 4 INCH POLY ALONG BELCLAIRE AVENUE AND ABANDON 860 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY SEPTEMBER 270 080.51513 0 RELOCATE FACILITIES. INSTALL (89) 0.75 INCH POLY SERVICE LINES AND ABANDON 810 FEET OF 6 INCH CAST IRON, 585 FEET OF 6 INCH POLY AND 89 STEEL SERVICES ALONG THOMAS PLACE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 271 080.51529 0 INSTALL STEEL SERVICES IN GRAND PRAIRIE AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER 272 080.51530 0 INSTALL STEEL SERVICES IN GRAND PRAIRIE AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER 273 080.51543 (0) INSTALL 1750 FEET OF 2 INCH POLY ALONG MUNDY DRIVE AND ABANDON 1750 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 274 080.51617 1 INSTALL 1100 FEET OF 2 INCH POLY ALONG SOUTH BARRY AND ABANDON 1550 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 275 080.51620 0 INSTALL 2251 FEET OF 2 INCH POLY ALONG TALLMAN AND ABANDON 1901 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 276 080.51648 (1,058) INSTALL 1200 FEET OF 6 INCH POLY ALONG VAUGHN AND ABANDON 1110 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 277 080.51653 2 INSTALL 1200 FEET OF 2 INCH POLY ALONG CARROL AND ABANDON 850 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER 278 080.51655 0 INSTALL 868 FEET OF 2 INCH POLY ALONG DAGGETT AND ABANDON 740 FEET OF 6 INCH CAST IRON, 317 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 279 080.51676 (1) RELOCATE FACILITIES. INSTALL 1470 FEET OF 4 INCH POLY AND ABANDON 720 FEET OF 4 INCH CAST IRON ALONG CARNATION AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 280 080.51702 3 RELOCATE FACILITIES. INSTALL 2600 FEET OF 4-INCH AND 180 FEET OF 2-INCH POLY AND ABANDON 2200 FEET OF 4-INCH STEEL, 1,200 FEET OF 4-INCH POLY ALONG STATE HIGHWAY 21 TO ACCOMMODATE CITY OF BRYAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES SEPTEMBER 281 080.51743 0 RELOCATE FACILITIES. INSTALL 365 FEET OF 6 INCH AND 210 FEET OF 2 INCH POLY ALONG PERKINS AND ABANDON 320 FEET OF 6 INCH, 110 FEET OF 2 INCH POLY AND 40 FEET OF 1.25 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES SEPTEMBER 282 080.51783 0 RELOCATE FACILITIES. INSTALL 3920 FEET OF 6 INCH, 130 FEET OF 4 INCH POLY AND ABANDON 2384 FEET OF 6 INCH STEEL, 1145 FEET OF 8 INCH STEEL, 335 FEET OF 6 INCH POLY, AND 20 FEET OF 8 INCH POLY ALONG SOUTH TOWN EAST BOULEVARD TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE RELOCATION OF FACILITIES SEPTEMBER 283 080.51801 1 RELOCATE FACILITIES. INSTALL 1712 FEET OF 2 INCH POLY AND ABANDON 997 FEET OF 4 INCH STEEL AND 860 FEET OF 4 INCH CAST IRON ALONG SYLVANIA TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 284 080.51804 0 INSTALL 475 FEET OF 2 INCH AND 546 FEET OF 4 INCH POLY ALONG CALHOUN AND ABANDON 453 FEET OF 6 INCH CAST IRON, 185 FEET OF 4 INCH, 264 FEET OF 2 INCH POLY AND 130 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 285 080.51806 5 RELOCATE FACILITIES. INSTALL 3126 FEET OF 4 INCH POLY ALONG YUCCA AVENUE AND ABANDON 2736 FEET OF 4 INCH CAST IRON AND 540 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 286 080.51829 0 INSTALL 825 FEET OF 2 INCH AND 737 FEET OF 4 INCH POLY AND ABANDON 1320 FEET OF 4 INCH CAST IRON AND 159 FEET OF 4 INCH STEEL ALONG JENNINGS TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 287 080.51840 1 INSTALL 1475 FEET OF 2 INCH AND 950 FEET OF 4 INCH POLY ALONG ALLEN STREET AND ABANDON 2112 FEET OF 4 INCH CAST IRON AND 264 FEET OF 4 INCH BARE STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 288 080.51843 21 RELOCATE FACILITIES. INSTALL 1715 FEET OF 4 INCH POLY AND ABANDON 678 FEET OF 4 INCH POLY AND 984 FEET OF 4 INCH CAST IRON ALONG DOROTHY LANE TO ACCOMODATE A CITY OF FORT WORTH DRAINAGE IMPROVEMENT PROJECT TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 289 080.51846 2 INSTALL 1300 FEET OF 4 INCH POLY AND ABANDON 480 FEET OF 6 INCH AND 1230 FEET OF 4 INCH CAST IRON ALONG MONTROSE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 290 080.51886 1 INSTALL 325 FEET OF 6 INCH POLY ALONG BEDFORD ROAD AND ABANDON 320 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE SYSTEM INTEGRITY SEPTEMBER 291 080.51889 3 INSTALL 1300 FEET OF 8 INCH POLY AND ABANDON 1200 FEET OF 8 INCH POLY ALONG EULESS SOUTH MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 292 080.51920 23,907 RELOCATE FACILITIES. INSTALL 720 FEET OF 2 INCH, 450 FEET OF 4 INCH, 485 FEET OF 6 INCH AND 950 FEET OF 8 INCH POLY ALONG IH35 AND ABANDON 425 FEET OF 4 INCH STEEL, 440 FEET OF 8 INCH, 690 FEET OF 6 INCH, 315 FEET OF 3 INCH, AND 470 FEET OF 2 INCH POLY TO ACCOMMODATE TXDOT PROJECT. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES APRIL 293 080.51994 0 INSTALL 1955 FEET OF 4 INCH POLY ALONG VAUGHN STREET AND ABANDON 2060 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 294 080.52029 1 RELOCATE FACILITIES. INSTALL 398 FEET OF 2 INCH, 342 FEET OF 4 INCH POLY ALONG AVENUE U AND ABANDON 84 FEET OF 3 INCH, 73 FEET OF 2 INCH, 88 FEET OF 1 1/14 POLY, 12 FEET OF 3 INCH, 316 FEET OF 4 INCH, 93 FEET OF 3 STEEL TO ACCOMMODATE CITY OF TEMPLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE RELOCATION OF FACILITIES SEPTEMBER MTX Additions Page 9 of 178 228 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 295 080.52036 39 RELOCATE FACILITIES. INSTALL 1380 FEET OF 4 INCH POLY AND 400 FEET OF 6 INCH POLY ALONG GOLIAD STREET AND ABANDON 173 FEET OF 3 INCH POLY, 1010 FEET OF 4 INCH POLY AND 383 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL RELOCATION OF FACILITIES OCTOBER 296 080.52039 0 INSTALL 450 FEET OF 2 INCH POLY ALONG WOODVILLE ROAD AND ABANDON 460 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER 297 080.52052 3 INSTALL (34) 0.75 INCH AND (6) 2 INCH POLY SERVICES ALONG FORT WORTH AND ABANDON (40) COPPER SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 298 080.52053 1 INSTALL (34) 0.75 INCH AND (6) 2 INCH POLY SERVICES AND ABANDON (40) COPPER SERVICE LINES ALONG STREETS OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 299 080.52055 3 INSTALL (34) 0.75 INCH AND (6) 2 INCH POLY SERVICES AND ABANDON (40) COPPER SERVICE LINES ALONG STREETS OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 300 080.52056 2 INSTALL (34) 0.75 INCH AND (6) 2.00 INCH POLY SERVICES AND ABANDON (40) COPPER SERVICES IN FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 301 080.52108 1,586,604 RELOCATE FACILITIES. INSTALL 485 FEET OF 2 INCH POLY AND 6490 FEET OF 6 INCH POLY; AND 800 FEET OF 10 INCH STEEL CASING ALONG BONNIE BRAE STREET AND ABANDON 490 FEET OF 2 INCH POLY, 935 FEET OF 4 INCH POLY AND 5,765 FEET OF 4 INCH STEEL TO ACCOMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER 302 080.52232 0 INSTALL (60) STEEL SERVICES AND ABANDON (60) STEEL SERVICES IN GRAND PRAIRIE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER 303 080.52245 0 INSTALL 990 FEET OF 4 INCH POLY AND 300 FEET OF 2 INCH POLY AND ABANDON 1290 FEET OF 4 INCH CAST IRON ALONG LELAND AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 304 080.52260 0 INSTALL 26 FEET OF 4 INCH, 292 FEET OF 6 INCH, AND 8549 FEET OF 8 INCH POLY AND ABANDON 3310 FEET OF 4 INCH STEEL, 350 FEET OF 8 INCH STEEL AND 165 FEET OF 6 INCH POLY ALONG BELT LINE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ADDISON SYSTEM INTEGRITY SEPTEMBER 305 080.52287 1 INSTALL 3230 FEET OF 2 INCH, 990 FEET OF 4 INCH, 200 FEET OF 6 INCH POLY AND ABANDON 1150 FEET OF 6 INCH, 1295 FEET OF 4 INCH, 1650 FEET OF 3 INCH STEEL, 850 FEET OF 4 INCH AND 695 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY SEPTEMBER 306 080.52327 1 INSTALL 1185 FEET OF 2 INCH POLY AND ABANDON 465 FEET OF 4 INCH CAST IRON ALONG CLEVELAND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 307 080.52338 0 RELOCATE FACILITIES. INSTALL 500 FEET OF 8 INCH POLY ALONG FARM TO MARKET ROAD 550 AND ABANDON 290 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF HEATH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEATH RELOCATION OF FACILITIES SEPTEMBER 308 080.52367 2 INSTALL 1660 FEET OF 4 INCH POLY AND ABANDON 1060 FEET OF 6 INCH STEEL AND 1130 FEET OF 6 INCH CAST IRON ALONG CEDAR SPRINGS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 309 080.52398 0 INSTALL 3494 FEET OF 2 INCH POLY AND ABANDON 343 FEET OF 2 INCH AND 2929 FEET OF 6 INCH CAST IRON ALONG ROWAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 310 080.52412 0 RELOCATE FACILITIES. INSTALL 1475 FEET OF 4 INCH POLY ALONG LEON STREET AND ABANDON 300 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES SEPTEMBER 311 080.52442 0 RELOCATE FACILITIES. INSTALL 6700 FEET OF 8 INCH AND 116 FEET OF 4 INCH STEEL AND ABANDON 6672 FEET OF 4 INCH STEEL ALONG HIGHWAY 377 TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES SEPTEMBER 312 080.52463 38 INSTALL 1250 FEET OF 4 INCH AND 700 FEET OF 2 INCH POLY ALONG LLEWELLYN AVENUE AND ABANDON 985 FEET OF 6 INCH, 680 FEET OF 4 INCH CAST IRON, AND 215 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 313 080.52476 1 INSTALL 479 FEET OF 2 INCH AND 1896 FEET OF 4 INCH POLY ALONG EAST GREENWAY STREET AND ABANDON 1750 FEET OF 4 INCH, 550 FEET OF 6 INCH, AND 150 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 314 080.52537 0 INSTALL 2680 FEET OF 2 INCH POLY AND ABANDON 2300 FEET OF 2 INCH STEEL AND 380 FEET OF 2 INCH POLY ALONG WILSON ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 315 080.52538 0 RELOCATE FACILITIES. INSTALL 1350 FEET OF 2 INCH POLY AND ABANDON 1330 FEET OF 3 INCH STEEL ALONG LARGA TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 316 080.52539 0 RELOCATE FACILITIES. INSTALL 635 FEET OF 2 INCH POLY AND ABANDON 385 FEET OF 4 INCH STEEL AND 250 FEET OF 2 INCH STEEL ALONG WALNUT HILL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 317 080.52540 1 RELOCATE FACILITIES. INSTALL 400 FEET OF 8 INCH AND 150 FEET OF 4 INCH POLY ALONG LEMMON AVENUE AND ABANDON 154 FEET OF 6 INCH AND 437 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 318 080.52594 0 INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 319 080.52775 0 INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 320 080.52803 0 INSTALL 1200 FEET OF 2 INCH POLY AND ABANDON 1130 FEET OF 4 INCH CAST IRON ALONG MELBA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 321 080.52821 0 RELOCATE FACILITIES. INSTALL 39 STEEL SERVICES ALONG FORRESTAL DRIVE AND ABANDON 39 STEEL SERVICES TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES SEPTEMBER 322 080.52904 1 INSTALL 1750 FEET OF 2 INCH POLY AND ABANDON 1750 FEET OF 4 INCH CAST IRON ALONG LELAND AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 323 080.52906 (398) INSTALL 19050 FEET OF 4 INCH STEEL AND 45 FEET OF 6 INCH POLY AND ABANDON 18930 FEET OF 4 INCH STEEL AND 3 FEET OF 6 INCH POLY ON LINE E10- 5 IN GRAYSON COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOWE SYSTEM INTEGRITY OCTOBER 324 080.52909 2 INSTALL 1250 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY AND ABANDON 1570 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 325 080.52910 0 INSTALL 1130 OF 8 INCH POLY AND ABANDON 1130 FEET OF 10 INCH STEEL IN DALLAS ALONG SYCAMORE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 326 080.52913 0 INSTALL 330 FEET OF 4 INCH POLY AND ABANDON 325 FEET OF 4 INCH STEEL ALONG FIFTH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 327 080.52914 0 RELOCATE FACILITIES. INSTALL 720 FEET OF 2 INCH POLY AND THREE 0.75 INCH POLY SERVICES ALONG BOMAR AVENUE AND ABANDON 720 FEET OF 4 INCH STEEL AND 3 SERVICES TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER MTX Additions Page 10 of 178 229 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 328 080.52917 320 INSTALL 3850 FEET OF 4 INCH AND 355 FEET OF 2 INCH POLY ALONG WESTLAKE AND ABANDON 835 FEET OF 6 INCH AND 3350 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 329 080.53005 0 INSTALL 765 FEET OF 4 INCH POLY AND 905 FEET OF 2 INCH POLY ALONG WESTSIDE DRIVE AND ABANDON 760 FEET OF 6 INCH CAST IRON AND 945 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 330 080.53046 0 INSTALL 575 FEET OF 4 INCH POLY AND ABANDON 300 FEET OF 4 INCH CAST IRON ALONG WASHINGTON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 331 080.53048 1 INSTALL 1150 FEET OF 4 INCH AND 690 FEET OF 2 INCH POLY ALONG COLLEGE STREET AND ABANDON 3615 FEET OF 4 INCH CAST IRON AND 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER 332 080.53189 4 INSTALL 2550 FEET OF 2 INCH POLY AND ABANDON 2100 FEET OF 4 INCH CAST IRON AND 275 FEET OF 4 INCH POLY ALONG SHELBY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 333 080.53195 1 INSTALL 1830 FEET OF 2 INCH POLY ALONG PINE AND ABANDON 1830 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 334 080.53204 0 INSTALL 1630 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 8 INCH POLY, 1605 FEET OF 8 INCH AND 235 FEET OF 4 INCH CAST IRON ALONG DAVIS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 335 080.53221 278 RELOCATE FACILITIES. INSTALL 324 FEET OF 2 INCH AND 7346 FEET OF 4 INCH POLY AND ABANDON 4530 FEET OF 2 INCH STEEL AND 25 FEET OF 2 INCH POLY AND 325 FEET OF 4 INCH POLY ALONG ABRAM STREET TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 336 080.53238 0 INSTALL 1170 FEET OF 4 INCH POLY ALONG NAKONA DRIVE AND ABANDON 1590 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 337 080.53242 0 INSTALL 1540 FEET OF 2 INCH POLY ALONG BIDDISON STREET AND ABANDON 620 FEET OF 6 INCH, 430 FEET OF 4 INCH CAST IRON AND 180 FEET OF 2 INCH, AND 670 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 338 080.53254 2 INSTALL 2248 FEET OF 2 INCH POLY AND ABANDON 2675 FEET OF 4 INCH CAST IRON ALONG PARNELL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 339 080.53277 2 INSTALL 1200 FEET OF 2 INCH POLY, REPLACE 8 3/4 INCH SERVICES ALONG WEST CLARENDON DRIVE AND ABANDON 1575 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 340 080.53302 0 INSTALL 1760 FEET OF 2 INCH POLY ALONG SOUTH BISHOP AVE AND ABANDON 525 FEET OF 4 INCH AND 1235 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 341 080.53322 0 RELOCATE FACILITIES. INSTALL 120 FEET OF 4 INCH, 250 FEET OF 2 INCH POLY ALONG BAMBOO AND ABANDON 225 FEET OF 2 INCH, 100 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE RELOCATION OF FACILITIES SEPTEMBER 342 080.53384 183 RELOCATE FACILITIES. INSTALL 310 FEET OF 6 INCH AND 5927 FEET OF 8 INCH POLY ALONG SOUTHWEST PARKWAY AND ABANDON 37 FEET OF 4 INCH, 208 FEET OF 6 INCH, AND 5185 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES SEPTEMBER 343 080.53385 32 INSTALL AC MITIGATION FACILITIES ALONG LINE D17 IN ORDER TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER 344 080.53392 0 INSTALL 1100 FEET OF 4 INCH POLY AND 26 0.75 INCH SERVICES. ABANDON 1100 FEET OF 3 INCH STEEL ALONG ALCORN ALLEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 345 080.53451 1 INSTALL 1170 FEET OF 2 INCH POLY ALONG DELAWARE AND ABANDON 1170 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 346 080.53479 0 RELOCATE FACILITIES. INSTALL 400 FEET OF 8 INCH AND 6900 FEET OF 6 INCH, 700 FEET OF 4 INCH AND 1200 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 8 INCH, 1150 FEET OF 4 INCH, AND 5900 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS RELOCATION OF FACILITIES SEPTEMBER 347 080.53535 1 RELOCATE FACILITIES. INSTALL 4560 FEET OF 6 INCH, 320 FEET OF 4 INCH, AND 760 FEET OF 2 INCH POLY ALONG PIPELINE ROAD AND ABANDON 4560 FEET OF 6 INCH, 320 FEET OF 4 INCH, AND 760 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF HURST STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST RELOCATION OF FACILITIES SEPTEMBER 348 080.53555 1 INSTALL 1530 FEET OF 2 INCH POLY AND ABANDON 1920 FEET CAST IRON ALONG BECKLEY AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 349 080.53561 0 INSTALL 1285 FEET OF 2 INCH POLY ALONG MADISON AND ABANDON 85 FEET OF 2 INCH STEEL, 1720 FEET OF 4 INCH, AND 1325 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 350 080.53591 44 RELOCATE FACILITIES. INSTALL 6 FEET OF 2 INCH, 8 FEET OF 3 INCH, 231 FEET OF 4 INCH, AND 1091 FEET OF 6 INCH POLY ALONG NEW YORK AVENUE AND ABANDON 890 FEET OF 6 INCH, 160 FEET OF 3 INCH, AND 150 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES SEPTEMBER 351 080.53612 0 INSTALL 1175 FEET OF 4 INCH POLY AND ABANDON 1335 FEET OF 6 INCH CAST IRON ALONG NAKONA DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 352 080.53613 515 INSTALL 4434 FEET OF 2 INCH POLY ALONG THE STREETS OF AVERY POINTE PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ANNA GROWTH SEPTEMBER 353 080.53614 1 INSTALL 370 FEET OF 4 INCH POLY ALONG EAST 26TH STREET AND ABANDON 360 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER 354 080.53623 0 INSTALL 1210 FEET OF 2 INCH POLY AND ABANDON 1160 FEET OF 4 INCH CAST IRON ALONG SOUTH FITZHUGH AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 355 080.53624 2 INSTALL 1300 FEET OF 2 INCH POLY ALONG FITZHUGH AVENUE AND ABANDON 485 FEET OF 4 INCH AND 915 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 356 080.53627 0 INSTALL 1320 FEET OF 4 INCH AND 300 FEET OF 2 INCH POLY AND ABANDON 300 FEET OF 4 INCH AND 1310 FEET OF 8 INCH CAST IRON ALONG HARDING STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 357 080.53654 0 RELOCATE FACILITIES. INSTALL 2706 FEET OF 2 INCH POLY AND ABANDON 2711 FEET OF 2 INCH STEEL AND 1566 FEET OF 3 INCH STEEL ALONG RIVERSIDE DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 358 080.53668 0 INSTALL 1235 FEET OF 2 INCH POLY ALONG NORTH ROSEMONT DRIVE AND ABANDON 170 FEET OF 2 INCH, 1187 FEET OF 6 INCH CAST IRON, AND 22 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 11 of 178 230 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 359 080.53671 3 INSTALL 3035 FEET OF 2 INCH POLY ALONG THACKERY AND ABANDON 2005 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER 360 080.53675 0 INSTALL 140 POLY SERVICES IN THE CITY OF CLEBURNE AND ABANDON 140 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER 361 080.53677 0 RELOCATE FACILITIES. INSTALL 435 FEET OF 6 INCH POLY ALONG NORTHWEST HIGHWAY AND ABANDON 425 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 362 080.53678 1 INSTALL 345 POLY SERVICES IN THE CITY OF GRAND PRAIRIE AND ABANDON 345 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER 363 080.53684 0 RELOCATE FACILITIES. INSTALL 500 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY AND ABANDON 20 FEET OF 2 INCH AND 500 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF PALESTINE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE RELOCATION OF FACILITIES SEPTEMBER 364 080.53696 1 INSTALL 1600 FEET OF 6 INCH POLY ALONG MOCKINGBIRD LANE AND ABANDON 1645 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY SEPTEMBER 365 080.53697 3 INSTALL 1200 FEET OF 2 INCH POLY ALONG MISTY WOOD STREET AND ABANDON 2202 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 366 080.53699 0 INSTALL 1300 FEET OF 2 INCH POLY AND ABANDON 1328 FEET OF 2 INCH POLY ALONG STONEPORT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 367 080.53700 2 INSTALL 1330 FEET OF 2 INCH POLY ALONG ELAM ROAD AND ABANDON 980 FEET OF 2 INCH AND 530 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 368 080.53711 0 INSTALL (50) POLY SERVICES AND ABANDON (50) STEEL SERVICE LINES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 369 080.53712 0 INSTALL 1645 FEET OF 2 INCH POLY ALONG HOLMES STREET AND ABANDON 1645 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 370 080.53713 1 INSTALL 950 FEET OF 2 INCH POLY ALONG HICKMAN LANE AND ABANDON 941 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 371 080.53731 0 INSTALL 985 FEET OF 4 INCH, 840 FEET OF 2 INCH POLY AND ABANDON 800 FEET OF 4 INCH CAST IRON ALONG GARLAND ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 372 080.53778 0 INSTALL APPROXIMATELY 1677 FEET OF 4 INCH POLY ALONG BROADWAY AND ABANDON 1393 FEET OF 4 INCH AND 388 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 373 080.53779 0 INSTALL 1531 FEET OF 4 INCH POLY ALONG BRYAN STREET AND ABANDON 1531 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 374 080.53785 0 INSTALL 1837 FEET OF 4 INCH POLY AND ABANDON 519 FEET OF 6 INCH, 1111 FEET OF 4 INCH CAST IRON, 167 FEET OF 2 INCH, AND 40 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 375 080.53800 412 INSTALL 8526 FEET OF 8 INCH, 840 FEET OF 4 INCH AND 2248 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER 376 080.53809 0 INSTALL 1360 FEET OF 4 INCH POLY ALONG MISSOURI AVENUE AND ABANDON 878 FEET OF 4 INCH AND 1980 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 377 080.53810 0 INSTALL 688 FEET OF 2 INCH AND 2029 FEET OF 4 INCH POLY AND ABANDON 92 FEET OF 2 INCH, 403 FEET OF 4 INCH, 41 FEET OF 6 INCH AND 1692 FEET OF 8 INCH CAST IRON, 109 FEET OF 6 INCH, AND 35 FEET OF 8 INCH POLY ALONG TUCKER AT HEMPHILL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 378 080.53811 0 INSTALL 1433 FEET OF 4 INCH POLY ALONG DAGGETT STREET AND ABANDON 1433 FEET OF 4 INCH CAST IRON AND 309 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 379 080.53813 0 INSTALL 61 FEET OF 2 INCH AND 2210 FEET OF 4 INCH POLY AND ABANDON 1104 FEET OF 4 INCH CAST IRON ALONG STREETS OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 380 080.53824 (0) INSTALL 2340 FEET OF 4 INCH POLY ANF 35 FEET OF 8 INCH STEEL ALONG HIGHWAY 67 AND ABANDON 3900 FEET OF 20 INCH STEEL, 250 FEET OF 4 INCH AND 300 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 381 080.53829 0 INSTALL 1330 FEET OF 2 INCH, 314 FEET OF 4 INCH AND 5 FEET OF 6 INCH POLY ALONG RAMEY STREET AND ABANDON 624 FEET OF 4 INCH AND 442 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 382 080.53831 3 INSTALL 1280 FEET OF 4 INCH POLY ALONG VIRGINIA STREET AND ABANDON 1210 FEET OF 4 INCH, 1170 FEET OF 6 INCH STEEL AND 94 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY SEPTEMBER 383 080.53874 0 INSTALL 6965 FEET OF 4 INCH POLY AND ABANDON 2827 FEET OF 6 INCH, 2400 FEET OF 4 INCH CAST IRON, 47 FEET OF 8 INCH, 616 FEET OF 4 INCH STEEL, 794 FEET OF 6 INCH, AND 281 FEET OF 4 INCH POLY ALONG MITCHELL BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 384 080.53892 5,876 INSTALL 3550 FEET OF 2 INCH AND 850 FEET OF 4 INCH POLY ALONG THE STREETS OF HOLLYHOCK PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH SEPTEMBER 385 080.53893 5,876 INSTALL 6375 FEET OF 2 INCH AND 3525 FEET OF 4 INCH POLY ALONG THE STREETS OF HOLLYHOCK PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH SEPTEMBER 386 080.53894 2,474 INSTALL 5650 FEET OF 2 INCH POLY ALONG STREETS OF HOLLYHOCK PHASE 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH SEPTEMBER 387 080.53909 4 RELOCATE FACILITIES. INSTALL 3900 FEET OF 24 INCH STEEL AND ABANDON 3175 FEET OF 24 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS WHEATLAND ROAD IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 388 080.53959 0 INSTALL 619 FEET OF 4 INCH POLY AND 126 FEET OF 2 INCH POLY AND ABANDON 570 FEET OF 3 INCH AND 116 FEET OF 2 INCH STEEL ALONG TERRELL STREETS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CANTON SYSTEM INTEGRITY SEPTEMBER 389 080.54000 1 RELOCATE FACILITIES. INSTALL 807 FEET OF 2 INCH AND 1356 FEET OF 6 INCH POLY ALONG BELKNAP AND ABANDON 50 FEET OF 2 INCH, 55 FEET OF 6 INCH POLY AND 1356 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 390 080.54002 1 RELOCATE FACILITIES. INSTALL 957 FEET OF 4 INCH POLY ALONG MONTREAL CIRCLE AND ABANDON 875 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF HALTOM STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY RELOCATION OF FACILITIES SEPTEMBER 391 080.54021 0 INSTALL 3625 FEET OF 4 INCH POLY ALONG BURCHILL ROAD AND ABANDON 1715 FEET OF 4 INCH CAST IRON, 1625 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 392 080.54037 1,418 INSTALL 4755 FEET OF 2 INCH POLY ALONG THE STREETS OF AUBURN HILLS PHASE 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH SEPTEMBER 393 080.54043 5 RELOCATE FACILITIES. INSTALL 3706 FEET OF 4 INCH ALONG BOYD AVENUE AND ABANDON 81 FEET OF 2 INCH, 482 FEET OF 3 INCH , 1681 FEET OF 4 INCH CAST IRON , 2657 FEET OF 6 INCH CAST IRON , 220 FEET OF 4 INCH POLY, AND 50 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER MTX Additions Page 12 of 178 231 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 394 080.54046 75 RELOCATE FACILITIES. INSTALL 1780 FEET OF 4 INCH POLY ALONG FIELDER ROAD AND ABANDON 1765 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF ARLINGTON WATER AND SANITARY SEWER RENEWAL PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES SEPTEMBER 395 080.54052 1 INSTALL 45 STEEL SERVICES ALONG CITY OF FORT WORTH AND ABANDON 45 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 396 080.54086 0 RELOCATE FACILITIES. INSTALL 175 FEET OF 2 INCH AND 45 FEET OF 4 INCH POLY ALONG ARBOR LANE AND ABANDON 150 FEET OF 2 INCH POLY, 40 FEET OF 4 INCH POLY AND 5 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES SEPTEMBER 397 080.54090 2 RELOCATE FACILITIES. INSTALL 280 FEET OF 6 INCH POLY ALONG OLD BURLESON ROAD AND ABANDON 270 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN TARRANT COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 398 080.54097 2 INSTALL 2000 FEET OF 4 INCH POLY ALONG REUNION STREET AND ABANDON 1100 FEET OF 2 INCH AND 900 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FAIRFIELD SYSTEM INTEGRITY SEPTEMBER 399 080.54112 16 RELOCATE FACILITIES. INSTALL 2300 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY AND ABANDON 1030 FEET OF 4 INCH, 265 FEET OF 2 INCH POLY, 180 FEET OF 4 INCH AND 550 FEET OF 2 INCH STEEL ALONG HICKORY STREET TO ACCOMMODATE CITY OF DENTON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES SEPTEMBER 400 080.54141 119 INSTALL 2165 FEET OF 2 INCH AND 1850 FEET OF 6 INCH POLY ALONG POTOMAC AVENUE AND ABANDON 2885 FEET OF 6 INCH AND 75 FEET OF 2 INCH CAST IRON, 575 FEET OF 4 INCH POLY, AND 190 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY OCTOBER 401 080.54155 0 INSTALL 1755 FEET OF 2 INCH POLY ALONG HOLMES AND ABANDON 1335 FEET OF 4 INCH CAST IRON, 690 FEET OF 4 INCH, AND 145 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 402 080.54160 6 RELOCATE FACILITIES. INSTALL 2080 FEET OF 12 INCH STEEL ALONG SUBLETT ROAD AND ABANDON 51 FEET OF 2 INCH, 570 FEET OF 4 INCH POLY, AND 1720 FEET OF 12 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES SEPTEMBER 403 080.54166 4 RELOCATE FACILITIES. INSTALL 2200 FEET OF 4 INCH AND 1400 FEET OF 2 INCH POLY ALONG SOUTH COLLEGE AVENUE AND ABANDON 1700 FEET OF 4 INCH, 110 FEET OF 3 INCH, 900 FEET OF 2 INCH STEEL, 320 FEET OF 2 INCH, AND 60 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES OCTOBER 404 080.54195 0 RELOCATE FACILITIES. INSTALL 3387 FEET OF 4 INCH POLY ALONG COLONIAL PARKWAY AND ABANDON 1826 FEET OF 4 INCH STEEL, 959 FEET OF 6 INCH AND 506 FEET OF 4 INCH CAST IRON AND 610 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 405 080.54211 4 INSTALL 1950 FEET OF 2 INCH POLY AND ABANDON 1030 FEET OF 4 INCH, 385 FEET OF 6 INCH, AND 485 FEET OF 8 INCH CAST IRON ALONG CROZIER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 406 080.54213 0 INSTALL 1210 FEET OF 2 INCH POLY AND ABANDON 1210 FEET OF 4 INCH CAST IRON ALONG GARDEN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 407 080.54217 2 INSTALL 975 FEET OF 2 INCH AND 175 FEET OF 4 INCH POLY AND ABANDON 940 FEET OF 4 INCH CAST IRON ALONG LAWRENCE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 408 080.54253 2 RELOCATE FACILITIES. INSTALL 3961 FEET OF 4 INCH POLY ALONG NORTHWEST PARKWAY AND ABANDON 2930 FEET OF 4 INCH STEEL, 1005 FEET OF 4 INCH, 392 FEET OF 3 INCH, AND 86 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 409 080.54264 17 RELOCATE FACILITIES. INSTALL 1023 FEET OF 4 INCH, 210 FEET OF 2 INCH POLY AND ABANDON 1023 FEET OF 4 INCH STEEL ALONG ANGLE AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 410 080.54270 22 RELOCATE FACILITIES. INSTALL 2715 FEET OF 4 INCH POLY AND ABANDON 2666 FEET OF 4 INCH CAST IRON ALONG ROBINSON STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 411 080.54273 1 RELOCATE FACILITIES. INSTALL 3458 FEET OF 6 INCH AND 140 FEET OF 2 INCH POLY ALONG OLD RANDOL MILL ROAD AND ABANDON 3236 FEET OF 6 INCH, 210 FEET OF 2 INCH STEEL AND 334 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 412 080.54277 4,317 INSTALL 7200 FEET OF 6 INCH STEEL AND ONE REGULATOR STATION AND ABANDON TWO REGULATOR STATIONS IN LINCOLN PARK. ALL CUSTOMERS CROSS ROADS SYSTEM IMPROVEMENT APRIL 413 080.54287 1 RELOCATE FACILITIES. INSTALL 850 FEET OF 2 INCH POLY AND ABANDON 840 FEET OF 3 INCH STEEL ALONG CLARENDON TO ACCOMMODATE CITY OF COCKRELL HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COCKRELL HILL RELOCATION OF FACILITIES SEPTEMBER 414 080.54291 5 RELOCATE FACILITIES. INSTALL 273 FEET OF 2 INCH , 244 FEET OF 4 INCH, 2040 FEET OF 6 INCH POLY AND ABANDON 224 FEET OF 2 INCH, 236 FEET OF 4 INCH, 1986 FEET OF 6 INCH POLY ALONG COLONY STREET TO ACCOMMODATE CITY OF CARROLLTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THE COLONY RELOCATION OF FACILITIES SEPTEMBER 415 080.54318 0 INSTALL (257) POLY SERVICES IN THE CITY OF EDGECLIFF VILLAGE AND ABANDON (257) STEEL SERVICES ALONG IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER 416 080.54320 0 INSTALL (291) POLY SERVICES IN THE CITY OF ARLINGTON AND ABANDON (291) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER 417 080.54341 0 INSTALL 2755 FEET OF 2 INCH POLY ALONG MONTCLAIR AND ABANDON 2233 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 418 080.54356 0 RELOCATE FACILITIES. ABANDON 4646 FEET OF 6 INCH CAST IRON AND 776 FEET OF 6 INCH POLY ALONG ELDRIDGE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 419 080.54357 1 INSTALL 26 POLY SERVICES AND ABANDON 18 FEET OF 2 INCH STEEL AND 26 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 420 080.54359 3 INSTALL (55) POLY SERVICES IN THE CITY OF DALLAS AND ABANDON (55) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 421 080.54360 0 ABANDON 31 FEET OF 2 INCH STEEL IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 422 080.54366 1 INSTALL 825 FEET OF 4 INCH AND 125 FEET OF 2 INCH POLY AND ABANDON 815 FEET OF 4 INCH CAST IRON AND 125 FEET OF 2 INCH STEEL ALONG BRYAN PARKWAY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 423 080.54370 2 INSTALL (45) POLY SERVICES AND ABANDON (45) COPPER SERVICES IN THE TOWN OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 13 of 178 232 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 424 080.54427 (0) RELOCATE FACILITIES. INSTALL 1932 FEET OF 4 INCH POLY ALONG STADIUM DRIVE AND ABANDON 2054 FEET OF 4 INCH STEEL, 721 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 425 080.54428 10 RELOCATE FACILITIES. INSTALL 2285 FEET OF 4 INCH POLY ALONG WABASH AVENUE AND ABANDON 4124 FEET OF 4 INCH, 125 FEET OF 6 INCH STEEL, 125 FEET OF 6 INCH, AND 120 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 426 080.54431 0 INSTALL 560 FEET OF 4 INCH POLY ALONG FRONT STREET AND ABANDON 560 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FROST SYSTEM INTEGRITY SEPTEMBER 427 080.54446 0 INSTALL 1975 FEET OF 4 INCH POLY ALONG VICKERY BOULEVARD AND ABANDON 775 FEET OF 4 INCH POLY AND 425 FEET OF 4 INCH CAST IRON AND 1370 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 428 080.54447 0 INSTALL 4920 FEET OF 4 INCH POLY ALONG BELLAIRE AND ABANDON 2158 FEET OF 4 INCH, 2289 FEET OF 6 INCH AND 157 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 429 080.54468 5 INSTALL 1835 FEET OF 2 INCH POLY ALONG MENTOR AVENUE AND ABANDON 1800 FEET OF 4 INCH CAST IRON AND 40 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 430 080.54472 0 INSTALL 1743 FEET OF 2 INCH POLY AND ABANDON 1820 FEET OF 4 INCH CAST IRON AND 120 FEET OF 2 INCH STEEL ALONG MENTOR IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 431 080.54486 928 INSTALL 3275 FEET OF 2 INCH POLY ALONG THE STREETS OF HOMESTEAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SUNNYVALE GROWTH SEPTEMBER 432 080.54551 2 INSTALL 2825 FEET OF 8 INCH, 75 FEET OF 2 INCH AND 25 FEET OF 4 INCH ALONG WALNUT HILL LANE AND ABANDON 23 FEET OF 3 INCH, 22 FEET OF 6 INCH AND 2830 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 433 080.54570 0 INSTALL 250 FEET OF 6 INCH POLY, 1742 FEET OF 4 INCH POLY, 365 FEET OF 2 INCH POLY ALONG RUFUS ROAD AND ABANDON 1724 FEET OF 4 INCH CAST IRON , 415 FEET OF 6 INCH CAST IRON, 119 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 434 080.54590 1 INSTALL 1100 FEET OF 2 INCH POLY ALONG GOLDSPIER AND ABANDON 1100 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 435 080.54610 0 INSTALL 1282 FEET OF 2 INCH POLY AND ABANDON 940 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 436 080.54611 0 INSTALL 1520 FEET OF 2 INCH POLY ALONG WRIGHT AND ABANDON 680 FEET OF 6 INCH AND 340 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 437 080.54624 1 INSTALL 1125 FEET OF 2 INCH POLY ALONG HOLMES AND ABANDON 1125 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 438 080.54625 2 INSTALL 650 FEET OF 2 INCH AND 765 FEET OF 8 INCH POLY AND ABANDON 1340 FEET OF 4 INCH CAST IRON ALONG PENNSYLVANIA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 439 080.54661 118,264 INSTALL 16 FEET OF 4 INCH STEEL AND 56 FEET OF 6 INCH POLY AND 2 FEET OF 8 INCH STEEL AND 11978 FEET OF 12 INCH STEEL AND ABANDON 14 FEET OF 2 INCH POLY AND 13769 FEET OF 3 INCH STEEL AND 2 FEET OF 6 INCH POLY ALONG CHIESA ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT SYSTEM INTEGRITY OCTOBER 440 080.54681 0 RELOCATE FACILITIES. INSTALL (40) POLY SERVICES ALONG BELVEDERE DRIVE AND ABANDON (40) STEEL SERVICES TO ACCOMMODATE PHASE 1 OF THE CITY OF ARLINGTON 2016 RESIDENTIAL STREET REBUILD PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES SEPTEMBER 441 080.54685 61 RELOCATE FACILITIES. INSTALL 1808 FEET OF 8 INCH AND 100 FEET OF 2 INCH POLY ALONG NEW HOPE DRIVE AND ABANDON 1808 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF CEDAR PARK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR PARK RELOCATION OF FACILITIES SEPTEMBER 442 080.54704 3 INSTALL 840 FEET OF 2 INCH AND 325 FEET OF 4 INCH POLY ALONG LIVE OAK AND ABANDON 875 FEET OF 6 INCH CAST IRON AND 200 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 443 080.54706 1 INSTALL 1050 FEET OF 2 INCH POLY ALONG MENTOR AND ABANDON 940 FEET OF 2 INCH AND 1063 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 444 080.54707 0 INSTALL 950 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG WENONAH DRIVE AND ABANDON 930 FEET OF 4 INCH AND 800 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 445 080.54710 1 INSTALL (225) POLY SERVICES AND ABANDON (225) COPPER SERVICES IN THE CITY OF FORT WORTH IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 446 080.54711 3 INSTALL 1096 FEET OF 2 INCH POLY ALONG POINSETTIA AND ABANDON 1096 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 447 080.54717 0 INSTALL 1330 FEET OF 2 INCH POLY ALONG LAWHORN STREET AND ABANDON 1135 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 448 080.54733 120 INSTALL 17150 FEET OF 6 INCH AND 8350 FEET OF 4 INCH STEEL AT THE VAN ALSTYNE MEASURING STATION AND ABANDON 25476 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY SEPTEMBER 449 080.54794 1 INSTALL 1640 FEET OF 2 INCH POLY ALONG CLARENDON DRIVE AND ABANDON 2435 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 450 080.54797 2 INSTALL 1740 FEET OF 2 INCH POLY AND ABANDON 1690 FEET OF 4 INCH CAST IRON 1460 FEET OF 8 INCH STEEL ALONG SOUTH FLEMING AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 451 080.54842 1 INSTALL 207 POLY SERVICES AND ABANDON 270 STEEL SERVICES IN CITY OF SAGINAW IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY SEPTEMBER 452 080.54854 1 RELOCATE FACILITIES. INSTALL 3093 FEET OF 6 INCH AND 1276 FEET OF 2 INCH POLY ALONG US 377 AND ABANDON 3000 FEET OF 2 INCH STEEL AND 160 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES SEPTEMBER 453 080.54858 28 RELOCATE FACILITIES. INSTALL 2386 FEET OF 6 INCH, 350 FEET OF 4 INCH AND 1636 FEET OF 2 INCH POLY AND ABANDON 1520 FEET OF 2 INCH, 300 FEET OF 3 INCH STEEL AND 610 FEET OF 2 INCH POLY ALONG US 377 TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES SEPTEMBER 454 080.54859 1 RELOCATE FACILITIES. INSTALL 650 FEET OF 6 INCH AND 200 FEET OF 4 INCH POLY AND ABANDON 650 FEET OF 6 INCH AND 200 FEET OF 4 INCH POLY ALONG EAST BROAD STREET TO ACCOMMODATE CITY OF MANSFIELD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD RELOCATION OF FACILITIES SEPTEMBER 455 080.54863 3 INSTALL 725 FEET OF 6 INCH POLY ALONG HARVARD AND ABANDON 220 FEET OF 4 INCH CAST IRON AND 60 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 456 080.54875 0 INSTALL 2914 FEET OF 4 INCH POLY ALONG PARK PLACE AND ABANDON 1285 FEET OF 4 INCH AND , 42 FEET OF 1.25 FEET OF STEEL, 68 FEET OF 2 INCH, AND 33 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 14 of 178 233 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 457 080.54894 79 RELOCATE FACILITIES. INSTALL 6 FEET OF 3 INCH, 107 FEET OF 4 INCH AND 3216 FEET OF 6 INCH POLY ALONG FM3549 AND ABANDON 8 FEET OF 3 INCH AND 3310 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL RELOCATION OF FACILITIES SEPTEMBER 458 080.54895 0 INSTALL 1866 FEET OF 4 INCH POLY ALONG AVENUE J AND ABANDON 1325 FEET OF 4 INCH CAST IRON AND 540 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 459 080.54926 0 RELOCATE FACILITIES. INSTALL 860 FEET OF 2 INCH POLY AND ABANDON 625 FEET OF 2 INCH AND 500 FEET OF 4 INCH STEEL AND 11 FEET OF 2 INCH AND 5 FEET OF 4 INCH POLY ALONG 1ST STREET TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA RELOCATION OF FACILITIES SEPTEMBER 460 080.54934 7 INSTALL 685 FEET OF 2 INCH AND 2865 FEET OF 4 INCH POLY ALONG VAUGHN AND ABANDON 3550 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 461 080.54965 0 INSTALL 275 FEET OF 6 INCH POLY AND ABANDON 275 FEET OF 6 INCH CAST IRON ALONG DURHAM IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 462 080.54988 0 INSTALL SERVICES ALONG STREETS OF CARROLTON AND ABANDON SERVICES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY SEPTEMBER 463 080.55018 0 RELOCATE FACILITIES. INSTALL 222 FEET OF 2 INCH POLY AND ABANDON 212 FEET OF 2 INCH STEEL ALONG HARDEE STREET TO ACCOMMODATE CITY OF CHANDLER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHANDLER RELOCATION OF FACILITIES SEPTEMBER 464 080.55026 1 INSTALL 850 FEET OF 6 INCH AND 1230 FEET OF 4 INCH POLY ALONG GARRISON STREET AND ABANDON 836 FEET OF 8 INCH AND 1022 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER 465 080.55033 1 RELOCATE FACILITIES. INSTALL 374 FEET OF 2 INCH POLY AND ABANDON 337 FEET OF 2 INCH POLY ALONG THROCKMORTON TO ACCOMMODATE CITY OF ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL RELOCATION OF FACILITIES SEPTEMBER 466 080.55041 0 INSTALL 1217 FEET OF 2 INCH POLY AND ABANDON 1176 FEET OF 2 INCH POLY AND 32 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY SEPTEMBER 467 080.55045 0 INSTALL 2200 FEET OF 2 INCH POLY ALONG GLENWOOD AVENUE AND ABANDON 2200 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 468 080.55054 3 INSTALL 1000 FEET OF 2 INCH POLY AND ABANDON 970 FEET OF 6 INCH CAST IRON ALONG HUDSON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 469 080.55055 1 INSTALL 1230 FEET OF 2 INCH POLY ALONG HUDSON STREET AND ABANDON 1015 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 470 080.55059 0 INSTALL 1152 FEET OF 2 INCH POLY ALONG JACKSON STREET AND ABANDON 1152 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY SEPTEMBER 471 080.55060 82 RELOCATE FACILITIES. INSTALL 5175 FEET OF 2 INCH POLY AND ABANDON 3324 FEET OF 4 INCH STEEL, 350 FEET OF 4 INCH POLY AND 70 FEET OF 4 INCH CAST IRON ALONG BERKLEY PLACE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 472 080.55064 1 RELOCATE FACILITIES. INSTALL 1810 FEET OF 4 INCH AND 1010 FEET OF 2 INCH POLY AND ABANDON 680 FEET OF 2 INCH STEEL ALONG CHURCH STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 473 080.55065 2,158 INSTALL 9360 FEET OF 12 INCH STEEL AND ABANDON 9360 FEET OF 12 INCH STEEL ALONG LINE J2 EAST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 474 080.55070 0 INSTALL 902 FEET OF 2 INCH AND 650 FEET OF 6 INCH POLY ALONG NORTH CREEWOOD CIRCLE AND ABANDON 115 FEET OF 1.25 AND 787 FEET OF 3 INCH POLY AND 650 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY SEPTEMBER 475 080.55083 2 INSTALL 4150 FEET OF 6 INCH, 601 FEET OF 2 INCH AND 10 FEET OF 4 INCH POLY ALONG AMBLER STREET AND ABANDON 4000 FEET OF 4 INCH STEEL AND 400 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 476 080.55091 (0) RELOCATE FACILITIES. INSTALL 320 FEET OF 4 INCH POLY ALONG FM1938 AND ABANDON 400 FEET OF 4 INCH POLY AND 100 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF NORTH RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTH RICHLAND HILLS RELOCATION OF FACILITIES SEPTEMBER 477 080.55097 0 INSTALL 950 FEET OF 2 INCH POLY AND ABANDON 950 FEET OF 4 INCH CAST IRON ALONG DELAWARE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 478 080.55147 1,456 RELOCATE FACILITIES. INSTALL 20 FEET OF 4 INCH, 10 FEET OF 6 INCH, AND 1575 FEET OF 8 INCH POLY AND ABANDON 1530 FEET OF 4 INCH POLY ALONG INTERSTATE HIGHWAY 30 TO ACCOMMODATE TXDOT HIGHWAY IMPROVEMENT PROJECT. ALL CUSTOMERS ROCKWALL RELOCATION OF FACILITIES APRIL 479 080.55170 61 RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY ALONG AUSTIN STREET AND ABANDON 380 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES SEPTEMBER 480 080.55172 3 INSTALL 1550 FEET OF 2 INCH POLY ALONG 22ND STREET AND ABANDON 1100 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER 481 080.55178 (0) INSTALL 1240 FEET OF 4 INCH, 891 FEET OF 6 INCH AND 335 FEET OF 2 INCH POLY AND ABANDON 825 FEET OF 2 INCH STEEL, 43 FEET OF 3 INCH STEEL, 135 FEET OF 2 INCH POLY, 1833 FEET OF 4 INCH AND 1227 FEET OF 6 INCH CAST IRON ALONG DUTTON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER 482 080.55180 1 INSTALL 4468 FEET OF 2 INCH AND 360 FEET OF 4 INCH POLY ALONG CLAY AVENUE AND ABANDON 2416 FEET OF 4 INCH AND 6 INCH CAST IRON, 1934 FEET OF 4 INCH STEEL, AND 650 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER 483 080.55192 2 INSTALL 1750 FEET OF 2 INCH POLY ALONG LAWRENCE AND ABANDON 1780 FEET OF 4 INCH AND 500 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 484 080.55195 3 INSTALL 1025 FEET OF 2 INCH POLY AND 330 FEET OF 4 INCH POLY AND ABANDON 1025 FEET OF 6 INCH AND 330 FEET OF 8 INCH CAST IRON ALONG LELAND AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 485 080.55196 0 INSTALL 2760 FEET OF 6 INCH POLY AND ABANDON 1382 FEET OF 4 INCH, 838 FEET OF 6 INCH STEEL, 304 FEET OF 4 INCH, 70 FEET OF 6 INCH CAST IRON, 95 FEET OF 6 INCH , 71 FEET OF 2 INCH POLY ALONG TRAVIS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 486 080.55204 48 INSTALL 7900 FEET OF 4 INCH POLY ALONG BERKLEY PLACE AND ABANDON 1608 FEET OF 4 INCH CAST IRON AND 8320 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 487 080.55205 0 INSTALL 1040 FEET OF 2 INCH POLY ALONG CARL STREET AND ABANDON 1040 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 15 of 178 234 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 488 080.55210 7 INSTALL 5441 FEET OF 4 INCH POLY ALONG ODESSA AVENUE AND ABANDON 561 FEET OF 8 INCH AND 770 FEET OF 4 INCH CAST IRON AND 1721 FEET OF 4 INCH AND 625 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 489 080.55221 1 RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH AND 175 FEET OF 4 INCH POLY ALONG STAFFORD DRIVE AND ABANDON 50 FEET OF 1.25 INCH, 265 FEET OF 2 INCH AND 170 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES SEPTEMBER 490 080.55232 0 INSTALL 32 FEET OF 4 INCH POLY AND ABANDON 18 FEET OF 4 INCH CAST IRON ALONG STREETS OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 491 080.55234 0 RELOCATE FACILITIES. INSTALL 195 FEET OF 4 INCH AND 31 FEET OF 6 INCH POLY ALONG WHITLEY ROAD AND ABANDON 131 FEET OF 4 INCH AND 20 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF WATAUGA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WATAUGA RELOCATION OF FACILITIES SEPTEMBER 492 080.55241 0 INSTALL 1400 FEET OF 4 INCH POLY, 35 SERVICES AND ABANDON 1235 FEET OF 4 INCH CAST IRON, 35 SERVICES ALONG MCCART STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 493 080.55251 (0) INSTALL 1976 FEET OF 2 INCH POLY AND ABANDON 1851 FEET OF 2 INCH STEEL AND 8 FEET OF 2 INCH POLY ALONG 42ND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER 494 080.55257 0 INSTALL 1063 FEET OF 6 INCH POLY ALONG VICKERY AND ABANDON 1063 FEET OF 6 INCH CAST IRON AND 250 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 495 080.55260 0 INSTALL 1300 FEET OF 2 INCH POLY ALONG LAKE FOREST DRIVE AND ABANDON 1300 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ADDISON SYSTEM INTEGRITY SEPTEMBER 496 080.55279 90 INSTALL 1420 FEET OF 2 INCH AND 775 OF 4 INCH POLY AND ABANDON 345 FEET OF 6 INCH AND 1500 FEET OF 4 INCH CAST IRON ALONG GLENWICK LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER 497 080.55280 112 INSTALL 2710 FEET OF 2 INCH POLY AND ABANDON 565 FEET OF 1.25 INCH POLY, 2145 FEET OF 4 INCH, 720 FEET OF 6 INCH, AND 660 FEET OF 8 INCH CAST IRON ALONG NORTH FITZHUGH AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 498 080.55304 86 RELOCATE FACILITIES. INSTALL 2725 FEET OF 4 INCH POLY ALONG SIX FLAGS ROAD AND ABANDON 50 FEET OF 2 INCH, 86 FEET OF 4 INCH POLY AND 53 FEET OF 3 INCH, AND 2537 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES SEPTEMBER 499 080.55320 116 RELOCATE FACILITIES. INSTALL 3000 FEET OF 4 INCH POLY AND ABANDON 117 FEET OF 2 INCH, 1888 FEET OF 4 INCH STEEL AND 125 FEET OF 2 INCH, 25 FEET OF 4 INCH AND 20 FEET OF 6 INCH POLY ALONG FOREST STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 500 080.55322 105 INSTALL 1830 FEET OF 2 INCH POLY ALONG THROCKMORTON AND ABANDON 3515 FEET OF 4 INCH, 330 FEET OF 6 INCH CAST IRON, 150 FEET OF 4 INCH, 190 FEET OF 3 INCH POLY, 475 FEET OF 6 INCH AND 45 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 501 080.55337 43 INSTALL 6400 FEET OF 10 INCH STEEL AND ABANDON 6400 FEET OF 8 INCH STEEL ALONG KC WEST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 502 080.55351 106 RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH AND 3045 FEET OF 4 INCH POLY AND ABANDON 2487 FEET OF 2 INCH STEEL, 437 FEET OF 2 INCH, AND 180 FEET OF 4 INCH POLY ALONG PECAN STREET TO ACCOMMODATE THE CITY OF ROANOKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROANOKE RELOCATION OF FACILITIES OCTOBER 503 080.55379 99 INSTALL 1230 FEET OF 2 INCH POLY ALONG ELECTRA AND ABANDON 820 FEET OF 4 INCH AND 410 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 504 080.55380 (1,049) INSTALL 1030 FEET OF 2 INCH POLY AND ABANDON 1030 FEET OF 4 INCH CAST IRON ALONG BERTRAND AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 505 080.55397 (0) RELOCATE FACILITIES. INSTALL 1215 FEET OF 4 INCH AND 1285 FEET OF 2 INCH POLY ALONG KINGSBRIDGE AND ABANDON 680 FEET OF 4 INCH, 535 FEET OF 3 INCH AND 1385 FEET OF 2 INCH POLY TO ACCOMMODATE ALLEYS REHAB PROJECTS BY THE CITY OF GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES SEPTEMBER 506 080.55405 439 INSTALL 12557 FEET OF 6 INCH STEEL ALONG LINE M3 AND ABANDON 20695 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY OCTOBER 507 080.55419 3 INSTALL 2890 FEET OF 4 INCH POLY ALONG ROGERS AVENUE AND ABANDON 406 FEET OF 8 INCH, 1375 FEET OF 4 INCH CAST IRON, 1315 FEET OF 4 INCH, AND 317 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 508 080.55422 2 RELOCATE FACILITIES. INSTALL 1360 FEET OF 2 INCH POLY ALONG ROSEHILL ROAD AND ABANDON 1360 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES SEPTEMBER 509 080.55423 2 RELOCATE FACILITIES. INSTALL 840 FEET OF 4 INCH POLY ALONG LYONS ROAD AND ABANDON 810 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES SEPTEMBER 510 080.55424 3 RELOCATE FACILITIES. INSTALL 680 FEET OF 4 INCH POLY ALONG FALLBROOK DRIVE AND ABANDON 675 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES SEPTEMBER 511 080.55425 0 RELOCATE FACILITIES. INSTALL 480 FEET OF 2 INCH POLY ALONG GUTHRIE ROAD AND ABANDON 500 FEET OF 1.25 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES SEPTEMBER 512 080.55485 0 INSTALL 1100 FEET OF 2 INCH POLY ALONG PIERCE STREET AND ABANDON 960 FEET OF 6 INCH CAST IRON AND 140 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 513 080.55487 2 INSTALL 2055 FEET OF 2 INCH POLY ALONG EXLINE STREET AND ABANDON 210 FEET OF 4 INCH AND 1845 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 514 080.55488 6 INSTALL 1900 FEET OF 2 INCH POLY ALONG CARPENTER AVENUE AND ABANDON 1850 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 515 080.55495 53 RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH AND 465 FEET OF 6 INCH POLY ALONG PATTON DRIVE AND ABANDON 18 FEET OF 2 INCH AND 460 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES SEPTEMBER 516 080.55513 3 INSTALL (372) POLY SERVICES ALONG STREETS OF ARLINGTON AND ABANDON (372) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER 517 080.55520 0 INSTALL 300 FEET OF 4 INCH POLY ALONG BOMBER DRIVE AND ABANDON 285 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER 518 080.55565 2 RELOCATE FACILITIES. INSTALL 2425 FEET OF 2 INCH POLY ALONG GARDENVIEW AND ABANDON 2486 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER MTX Additions Page 16 of 178 235 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 519 080.55568 3 RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH, 1750 FEET OF 4 INCH, AND 100 FEET OF 8 INCH POLY ALONG HIGHLAND AND ABANDON 100 FEET OF 2 INCH, 2032 FEET OF 6 INCH, AND 294 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 520 080.55642 131 RELOCATE FACILITIES. INSTALL 5745 FEET OF 4 INCH POLY ALONG LOTUS AVENUE AND ABANDON 1800 FEET OF 6 INCH CAST IRON, 540 FEET OF 6 INCH, 580 FEET OF 3 INCH, AND 465 FEET OF 2 INCH STEEL, AND 185 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 521 080.55667 0 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION ALONG SW 1ST STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERENS SYSTEM INTEGRITY SEPTEMBER 522 080.55674 0 INSTALL 1215 FEET OF 6 INCH POLY, 4196 FEET OF 4 INCH POLY ALONG CUSTER ROAD AND ABANDON 1215 FEET OF 6 INCH STEEL, 2831 FEET OF 4 INCH POLY, 1365 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER 523 080.55682 (0) INSTALL 6033 FEET OF 2 INCH POLY ALONG KELSEY DRIVE AND ABANDON 5683 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER 524 080.55683 22 INSTALL 4200 FEET OF 2 INCH POLY AND ABANDON 4200 FEET OF 2 INCH POLY ALONG WESTLAKE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER 525 080.55697 2 RELOCATE FACILITIES. INSTALL 450 FEET OF 6 INCH POLY ALONG PRESTON ROAD AND ABANDON 350 FEET OF 6 INCH POLY AND 100 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FRISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO RELOCATION OF FACILITIES SEPTEMBER 526 080.55710 1 INSTALL 1310 FEET OF 2 INCH POLY AND ABANDON 1310 FEET OF 6 INCH CAST IRON ALONG SOUTH FITZHUGH AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 527 080.55728 284 INSTALL 3000 FEET OF 24 INCH STEEL ALONG DT3 IN DALLAS COUNTY AND ABANDON 3000 FEET OF 24 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER 528 080.55775 171 INSTALL 1395 FEET OF 2 INCH POLY ALONG VAN BUREN STREET AND ABANDON 25 FEET OF 4 INCH STEEL AND 1370 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 529 080.55797 1 INSTALL (163) POLY SERVICES ALONG STREETS OF FORT WORTH AND ABANDON (163) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 530 080.55823 0 RELOCATE FACILITIES. INSTALL 610 FEET OF 4 INCH POLY AND ABANDON 530 FEET OF 4 INCH POLY ALONG SHERMAN DRIVE TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES SEPTEMBER 531 080.55841 0 INSTALL (389) POLY SERVICES AND ABANDON (389) COPPER SERVICES IN THE CITY OF ARLINGTON IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER 532 080.55867 1 INSTALL 1750 FEET OF 2 INCH POLY ALONG BRYAN PARKWAY AND ABANDON 1615 FEET OF 4 INCH CAST IRON AND 135 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 533 080.55920 143 INSTALL 1535 FEET OF 2 INCH POLY ALONG CEDAR SPRINGS ROAD AND ABANDON 1035 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 534 080.55923 2 RELOCATE FACILITIES. INSTALL 2186 FEET OF 2 INCH POLY AND (29) POLY SERVICES ALONG SYLVANIA AVENUE AND ABANDON (29) STEEL SERVICES AND 30 FEET OF 2 INCH CAST IRON TO ACCOMMODATE THE CITY OF FORT WORTH CITY PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 535 080.55926 15 RELOCATE FACILITIES. INSTALL 3114 FEET OF 4 INCH POLY AND ABANDON 3100 FEET OF 4 INCH STEEL ALONG JACQELINE ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 536 080.55952 556,404 INSTALL 31,000 FEET OF 10 INCH STEEL ALONG HARMON ROAD AND US287 IN FORT WORTH. ALL CUSTOMERS FORT WORTH SYSTEM IMPROVEMENT DECEMBER 537 080.55961 2 INSTALL 930 FEET OF 2 INCH POLY ALONG MYRTLE DRIVE AND ABANDON 930 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 538 080.55963 4 INSTALL 1275 FEET OF 2 INCH POLY ALONG MYRTLE AND ABANDON 1275 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 539 080.55966 1 RELOCATE FACILITIES. INSTALL 900 FEET OF 6 INCH POLY ALONG RALPH HALL PARKWAY AND ABANDON 817 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL RELOCATION OF FACILITIES SEPTEMBER 540 080.55975 206 INSTALL 2140 FEET OF 4 INCH POLY AND ABANDON 2140 FEET OF 8 INCH CAST IRON ALONG LAKESHORE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 541 080.55976 191 INSTALL 975 FEET OF 4 INCH POLY AND 585 FEET OF 2 INCH POLY AND ABANDON 1100 FEET OF 8 INCH CAST IRON AND 460 FEET OF 4 INCH CAST IRON ALONG LAKESHORE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 542 080.55984 0 RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY ALONG ENNIS AVENUE AND ABANDON 800 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS RELOCATION OF FACILITIES SEPTEMBER 543 080.55992 2 INSTALL 750 FEET OF 4 INCH POLY ALONG URSALINE AVENUE AND ABANDON 526 FEET OF 4 INCH AND 215 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER 544 080.56012 0 RELOCATE FACILITIES. INSTALL 600 FEET OF 6 INCH POLY ALONG 23RD STREET AND ABANDON 127 FEET OF 3 INCH AND 464 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES SEPTEMBER 545 080.56030 0 RELOCATE FACILITIES. INSTALL 1860 FEET OF 8 INCH AND 350 FEET OF 2 INCH POLY ALONG LANCASTER AND ABANDON 50 FEET OF 6 INCH, 360 FEET OF 4 INCH, 900 FEET OF 3 INCH, AND 1835 FEET OF 8 INCH STEEL, 50 FEET OF 6 INCH, 640 FEET OF 4 INCH, AND 90 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 546 080.56033 0 RELOCATE FACILITIES. INSTALL 150 FEET OF 4 INCH AND 600 FEET OF 2 INCH POLY ALONG ALEXANDER DRIVE AND ABANDON 30 FEET OF 2 INCH, 635 FEET OF 3 INCH, 15 FEET OF 4 INCH STEEL, 106 FEET OF 2 INCH, AND 70 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE RELOCATION OF FACILITIES SEPTEMBER 547 080.56034 107 INSTALL 1390 FEET OF 2 INCH POLY ALONG WOODLAWN AND ABANDON 1240 FEET OF 4 INCH AND 290 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 548 080.56044 0 RELOCATE FACILITIES. INSTALL 720 FEET OF 6 INCH POLY ALONG FM 1171 AND ABANDON 120 FEET OF 6 INCH STEEL AND 580 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FLOWER MOUND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND RELOCATION OF FACILITIES SEPTEMBER 549 080.56065 3 INSTALL 975 FEET OF 2 INCH POLY ALONG PEMBROKE AND ABANDON 975 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 550 080.56067 0 INSTALL 1480 FEET OF 2 INCH POLY AND ABANDON 1385 FEET OF 6 INCH AND 315 FEET OF 4 INCH CAST IRON ALONG OAK LAWN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 17 of 178 236 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 551 080.56068 0 INSTALL 1460 FEET OF 2 INCH POLY ALONG PARK ROW AVENUE AND ABANDON 1045 FEET OF 4 INCH AND 310 FEET OF 6 INCH CAST IRON AND 135 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 552 080.56097 0 RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH POLY ALONG LONGNECK ROAD AND ABANDON 218 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF PRINCETON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PRINCETON RELOCATION OF FACILITIES SEPTEMBER 553 080.56105 379 RELOCATE FACILITIES. INSTALL 300 FEET OF 8 INCH POLY AND ABANDON 290 FEET OF 4 INCH POLY ALONG INTERSTATE HIGHWAY 30 TO ACCOMMODATE TXDOT HIGHWAY IMPROVEMENT PROJECT. ALL CUSTOMERS ROCKWALL RELOCATION OF FACILITIES APRIL 554 080.56107 3 INSTALL 2600 FEET OF 4 INCH POLY ALONG HARWIN STREET AND ABANDON 1238 FEET OF 4 INCH, 1160 FEET OF 6 INCH, AND 360 FEET OF 8 INCH CAST IRON, AND 225 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 555 080.56110 14 INSTALL DEEP WELL GROUND BED AND RECTIFIER AT STATION ALONG LINE L21 IN WILLIAMSON COUNTY IN ORDER TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY SEPTEMBER 556 080.56144 (0) INSTALL 2760 FEET OF 2 INCH POLY ALONG COLLEGE STREET AND ABANDON 1100 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOLLIDAY SYSTEM INTEGRITY SEPTEMBER 557 080.56147 (0) INSTALL 1525 FEET OF 2 INCH POLY ALONG ELM AND ABANDON 915 FEET OF 2 INCH STEEL AND 610 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOLLIDAY SYSTEM INTEGRITY SEPTEMBER 558 080.56150 (0) INSTALL 2418 FEET OF 2 INCH POLY AND ABANDON 2516 FEET OF 2 INCH STEEL AND 237 FEET OF 2 INCH POLY ALONG THE STREETS OF CHADBOURNE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WINGATE SYSTEM INTEGRITY SEPTEMBER 559 080.56160 0 INSTALL 163 FEET OF 2 INCH AND 2087 FEET OF 6 INCH POLY ALONG 11TH STREET AND ABANDON 163 FEET OF 2 INCH, 1490 FEET OF 6 INCH, 24 FEET OF 4 INCH, 467 FEET OF 8 INCH, 7 FEET OF 12 INCH STEEL, AND 98 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 560 080.56162 (0) INSTALL (249) POLY SERVICES AND ABANDON (249) STEEL SERVICES ALONG STREETS IN CITY OF TEMPLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY SEPTEMBER 561 080.56164 (0) INSTALL 1720 FEET OF 2 INCH AND 182 FEET OF 4 INCH POLY ALONG 10TH STREET AND ABANDON 648 FEET OF 3 INCH AND 1407 FEET OF 2 INCH STEEL AND 45 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 562 080.56173 (0) INSTALL 3860 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 3686 FEET OF 3 INCH, 58 FEET OF 4 INCH, 106 FEET OF 2 INCH STEEL AND 400 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY SEPTEMBER 563 080.56174 2 INSTALL 1140 FEET OF 2 INCH POLY AND ABANDON 1070 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 564 080.56180 0 INSTALL 1469 FEET OF 2 INCH AND 1221 FEET OF 4 INCH POLY ALONG DAVID DAVIS DRIVE AND ABANDON 1469 FEET OF 2 INCH AND 1221 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY SEPTEMBER 565 080.56186 (0) INSTALL 249 FEET OF 6 INCH AND 2141 FEET OF 2 INCH POLY ALONG 9TH STREET AND ABANDON 538 FEET OF 2 INCH, 1149 FEET OF 3 INCH, 210 FEET OF 4 INCH AND 249 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 566 080.56187 1 INSTALL 1000 FEET OF 2 INCH AND 670 FEET OF 4 INCH POLY ALONG US 175 AND ABANDON 1000 FEET OF 6 INCH AND 670 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 567 080.56188 1 INSTALL 480 FEET OF 2 INCH POLY AND ABANDON 318 FEET OF 4 INCH AND 1317 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 568 080.56194 0 INSTALL 3211 FEET OF 4 INCH POLY ALONG FM153 AND ABANDON 3051 FEET OF 3 INCH STEEL AND 160 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WINGATE SYSTEM INTEGRITY SEPTEMBER 569 080.56195 0 INSTALL 300 FEET OF 4 INCH POLY AND ABANDON 300 FEET OF 3 INCH STEEL ALONG BALLARD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEAGOVILLE SYSTEM INTEGRITY SEPTEMBER 570 080.56199 1 INSTALL 1770 FEET OF 2 INCH POLY AND ABANDON 1779 FEET OF 6 INCH CAST IRON ALONG YORK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 571 080.56200 43 INSTALL 1970 FEET OF 2 INCH POLY ALONG YORK AND ABANDON 1470 FEET OF 4 INCH AND 500 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 572 080.56209 (0) INSTALL 1601 FEET OF 2 INCH POLY ALONG 18TH STREET AND ABANDON 1479 FEET OF 2 INCH STEEL AND 122 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 573 080.56222 0 INSTALL 1210 FEET OF 4 INCH AND 340 FEET OF 2 INCH POLY AND ABANDON 289 FEET OF 6 INCH AND 1100 FEET OF 8 INCH CAST IRON ALONG MALCOLM X BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 574 080.56225 1 INSTALL (200) POLY SERVICES AND ABANDON (200) COPPER SERVICES ALONG STREETS OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 575 080.56228 11 INSTALL 810 FEET OF 4 INCH AND 300 FEET OF 2 INCH POLY ALONG MCDERMOTT AND ABANDON 1110 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 576 080.56229 (0) INSTALL 1300 FEET OF 6 INCH POLY ALONG WINDTHORST ROAD AND ABANDON 1300 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 577 080.56232 199 INSTALL 1875 FEET OF 2 INCH AND 355 FEET OF 4 INCH POLY AND ABANDON 1392 FEET OF 3 INCH AND 93 FEET OF 4 INCH CAST IRON ALONG LOMO ALTO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER 578 080.56234 2 INSTALL 625 FEET OF 4 INCH POLY ALONG EAST 30TH STREET AND ABANDON 610 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER 579 080.56236 0 INSTALL 913 FEET OF 4 INCH POLY ALONG STRONG AVENUE AND ABANDON 913 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY SEPTEMBER 580 080.56237 1 RELOCATE FACILITIES. INSTALL 620 FEET OF 2 INCH POLY ALONG SUNNYBROOK AND ABANDON 620 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES SEPTEMBER 581 080.56244 0 INSTALL 1670 FEET OF 2 INCH POLY ALONG BRYAN STREET AND ABANDON 1260 FEET OF 8 INCH, 140 FEET OF CAST IRON, 210 FEET OF 4 INCH POLY AND 600 FEET OF 8 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 582 080.56245 303 INSTALL 1200 FEET OF 8 INCH POLY AND ABANDON 1200 FEET OF 8 INCH STEEL ALONG HIGHWAY 161 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER 583 080.56246 (0) INSTALL 852 FEET OF 2 INCH POLY ALONG HUTCHINS STREET AND ABANDON 488 FEET OF 3 INCH, 107 FEET OF 2 INCH, 817 FEET OF 4 INCH POLY, 253 FEET OF 3 INCH, AND 170 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY SEPTEMBER 584 080.56249 0 INSTALL 332 FEET OF 2 INCH AND 410 FEET OF 4 INCH POLY ALONG 13TH STREET AND ABANDON 273 FEET OF 6 INCH, 307 FEET OF 3 INCH, AND 183 FEET OF 4 INCH STEEL, AND 25 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 18 of 178 237 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 585 080.56251 5 RELOCATE FACILITIES. INSTALL 453 FEET OF 6 INCH POLY ALONG JIM CRYSTAL ROAD AND ABANDON 453 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES SEPTEMBER 586 080.56321 500 SOUTHWEST REGION SOUTH AREA OPERATIONS BLANKET FOR NEW SERVICE LINES. ALL CUSTOMERS SYSTEM WIDE SYSTEM EXPANSION DUE TO CUSTOMER GROWTH JULY 587 080.56363 395,738 INSTALL SERVICES AND ABANDON SERVICES IN NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 588 080.56364 1,169,087 INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 589 080.56365 4,059,623 INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE DALLAS REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 590 080.56366 673,116 INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE SOUTHEAST EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 591 080.56367 824,745 INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE SOUTHEAST SOUTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 592 080.56368 1,404,951 INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE SOUTHWEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 593 080.56369 427,524 INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE SOUTHWEST SOUTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 594 080.56370 722,017 INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE SOUTHWEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STSTEM WIDE SYSTEM INTEGRITY OCTOBER 595 080.56371 477,362 INSTALL METERS AND ABANDON METERS IN THE NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 596 080.56372 510,836 INSTALL METERS AND ABANDON METERS IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 597 080.56373 770,208 INSTALL METERS AND ABANDON METERS IN THE DALLAS REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 598 080.56374 363,144 INSTALL METERS AND ABANDON METERS IN THE SOUTHEAST EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 599 080.56375 249,875 INSTALL METERS AND ABANDON METERS IN THE SOUTHEAST SOUTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 600 080.56376 613,862 INSTALL METERS AND ABANDON METERS IN THE SOUTHWEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 601 080.56377 245,906 INSTALL METERS AND ABANDON METERS IN THE SOUTHWEST SOUTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 602 080.56378 200,681 INSTALL METERS AND ABANDON METERS IN THE SOUTHWEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 603 080.56387 305,524 INSTALL MAIN ALONG STREETS OF NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 604 080.56388 1,243,727 REPLACE MAINS IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWSTEM WIDE SYSTEM INTEGRITY OCTOBER 605 080.56389 2,600 REPLACE MAINS IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 606 080.56390 400,672 INSTALL 14 FEET OF 2 INCH POLY AND ABANDON 544 FEET OF 2 INCH STEEL IN THE SOUTHEAST EAST REGION ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 607 080.56391 735,780 REPLACE MAINS IN THE SOUTHEAST SOUTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 608 080.56392 686,212 REPLACE MAINS IN THE SOUTHWEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 609 080.56393 225,937 REPLACE MAINS IN SOUTHWEST SOUTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 610 080.56394 1,363,988 REPLACE MAINS IN THE SOUTHWEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER 611 080.56403 0 INSTALL 700 FEET OF 2 INCH POLY AND ABANDON 700 FEET OF 2 INCH STEEL ALONG WREN DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER 612 080.56410 2 RELOCATE FACILITIES. INSTALL 604 FEET OF 2 INCH POLY ALONG MOTLEY DRIVE AND ABANDON 604 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE RELOCATION OF FACILITIES SEPTEMBER 613 080.56416 1 INSTALL 2125 FEET OF 2 INCH POLY ALONG TYLER STREET AND ABANDON 1830 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 614 080.56421 2 INSTALL 1800 FEET OF 2 INCH POLY AND ABANDON 50 FEET OF 6 INCH STEEL AND 405 FEET 6 INCH AND 565 FEET OF 4 INCH CAST IRON ALONG COLORADO IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 615 080.56422 1 INSTALL 1300 FEET OF 2 INCH POLY AND ABANDON 580 FEET OF 4 INCH CAST IRON ALONG MAYFLOWER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 616 080.56430 42 INSTALL 1185 FEET OF 2 INCH POLY ALONG CLINTON AVENUE AND ABANDON 275 FEET OF 6 INCH POLY, 590 FEET OF 4 INCH CAST IRON AND 320 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 617 080.56431 2 INSTALL 120 FEET OF 6 INCH STEEL ALONG GREAT SOUTH PARKWAY AND ABANDON 120 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER 618 080.56433 8 RELOCATE FACILITIES. INSTALL 945 FEET OF 4 INCH AND 163 FEET OF 2 INCH POLY ALONG BRENNAN AVENUE AND ABANDON 730 FEET OF 4 INCH, 25 FEET OF 2 INCH STEEL AND 206 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 619 080.56456 (0) INSTALL 675 FEET OF 4 INCH POLY ALONG HAWES AND ABANDON 675 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 620 080.56483 (0) INSTALL 650 FEET OF 4 INCH POLY ALONG HUTCHINS AND ABANDON 95 FEET OF 6 INCH, 416 FEET OF 3 INCH, AND 139 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY SEPTEMBER 621 080.56497 4 RELOCATE FACILITIES. INSTALL 680 FEET OF 8 INCH POLY ALONG CRESTVIEW DRIVE AND ABANDON 680 FEET OF 8 INCH STEEL AND 400 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 622 080.56502 0 INSTALL 300 FEET OF 4 INCH POLY ALONG WALTON DRIVE AND ABANDON 500 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY SEPTEMBER 623 080.56510 45 INSTALL 2785 FEET OF 2 INCH POLY ALONG DARMOUTH AVENUE AND ABANDON 1363 FEET OF 6 INCH AND 1800 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 624 080.56538 (0) INSTALL 1311 FEET OF 2 INCH POLY ALONG 12TH STREET AND ABANDON 1311 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 19 of 178 238 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 625 080.56543 6 INSTALL 2850 FEET OF 4 INCH POLY ALONG ADA AVENUE AND ABANDON 1450 FEET OF 4 INCH AND 1850 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 626 080.56544 2 INSTALL 1600 FEET OF 4 INCH POLY ALONG WILDWOOD ROAD AND ABANDON 1600 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 627 080.56545 9 INSTALL 1895 FEET OF 4 INCH POLY AND ABANDON 1625 FEET OF 4 INCH CAST IRON AND 270 FEET OF 2 INCH STEEL ALONG WATAUGA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 628 080.56556 0 INSTALL 3725 FEET OF 2 INCH POLY ALONG COLLEGE HILLS AND ABANDON 2373 FEET OF 2 INCH, 1323 FEET OF 3 INCH STEEL, 13 FEET OF 2 INCH AND 16 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY SEPTEMBER 629 080.56567 (0) INSTALL ACTUATED VALVE, RELIEF VALVE, AND INSULATING FLANGE KITS AND ABANDON MANUAL VALVE, AND ACTUATED VALVE FOR OWENS CORNING PLANT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY SEPTEMBER 630 080.56571 5,660 RELOCATE FACILITIES. INSTALL 1500 FEET OF 6 INCH STEEL AND ABANDON 740 FEET OF 3 INCH STEEL AND 498 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF ALVARADO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALVARADO RELOCATION OF FACILITIES OCTOBER 631 080.56572 146 INSTALL 970 FEET OF 10 INCH STEEL ALONG AVENUE J AND ABANDON 940 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 632 080.56583 (0) RELOCATE FACILITIES. INSTALL 1756 FEET OF 6 INCH POLY ALONG MEADOW BROOK DRIVE AND ABANDON 1756 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 633 080.56586 6 RELOCATE FACILITIES. INSTALL 2006 FEET OF 4 INCH POLY ALONG ROCKHILL ROAD AND ABANDON 1990 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 634 080.56593 0 INSTALL 2025 FEET OF 2 INCH POLY AND ABANDON 1050 FEET OF 4 INCH AND 975 FEET OF 6 INCH CAST IRON ALONG COLORADO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 635 080.56598 0 INSTALL 340 FEET OF 4 INCH POLY ALONG HOPKINS AND ABANDON 338 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER 636 080.56611 1 INSTALL 1460 FEET OF 2 INCH POLY AND ABANDON 460 FEET OF 6 INCH AND 1200 FEET OF 4 INCH CAST IRON ALONG BATES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 637 080.56612 8 INSTALL 1835 FEET OF 2 INCH POLY AND ABANDON 1425 FEET OF 6 INCH CAST IRON AND 350 FEET OF 6 INCH AND 60 FEET OF 2 INCH STEEL ALONG MILLERDALE IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 638 080.56614 5 INSTALL 1135 FEET OF 2 INCH POLY ALONG FAIRDALE AND ABANDON 1135 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 639 080.56618 0 RELOCATE FACILITIES. INSTALL 1360 FEET OF 2 INCH, 9800 FEET OF 4 INCH,40 FEET OF 6 INCH POLY ALONG PULLIAM STREET AND ABANDON 19 FEET OF 1.25 INCH, 700 FEET OF 2 INCH, 106 FEET OF 6 INCH, 3208 FEET OF 4 INCH, 2257 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF SAN ANGELO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO RELOCATION OF FACILITIES SEPTEMBER 640 080.56625 103 INSTALL 1112 FEET OF 4 INCH AND 490 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK 1E. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER 641 080.56651 313 INSTALL TEST STATION ALONG LINE P7 IN ORDER TO PROVIDE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY SEPTEMBER 642 080.56652 7 INSTALL 4007 FEET OF 4 INCH POLY AND ABANDON 1206 FEET OF 2 INCH POLY AND 965 FEET OF 3 INCH STEEL IN TAYLOR COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 643 080.56662 73 RELOCATE FACILITIES. INSTALL 1785 FEET OF 6 INCH POLY AND ABANDON 1785 FEET OF 6 INCH STEEL IN HAYNES AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 644 080.56670 5,729 INSTALL DISTRICT REGULATOR STATION AT TURTLE CREEK IN DALLAS COUNTY AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 645 080.56680 6 INSTALL 1745 FEET OF 2 INCH POLY AND ABANDON 1050 FEET OF 4 INCH, 150 FEET OF 6 INCH CAST IRON, AND 450 FEET OF 4 INCH POLY ALONG OWENSONS DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 646 080.56681 7 INSTALL 1710 FEET OF 2 INCH POLY ALONG NOLTE DRIVE AND ABANDON 1710 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 647 080.56685 0 RELOCATE FACILITIES. INSTALL 2280 FEET OF 4 INCH POLY AND ABANDON 2250 FEET OF 4 INCH STEEL ALONG VEGA STREET TO ACCOMMODATE THE CITY OF GRAND PRAIRIE DRAINAGE IMPROVEMENTS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES SEPTEMBER 648 080.56686 0 INSTALL 3200 FEET OF 4 INCH POLY AND ABANDON 2050 FEET OF 4 INCH CAST IRON, 1100 FEET OF 4 INCH STEEL ALONG CRENSHAW ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 649 080.56717 0 INSTAL (243) POLY SERVICES AND ABANDON (243) STEEL SERVICES ALONG STREETS OF ARLINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 650 080.56720 (0) INSTALL (253) POLY SERVICES AND ABANDON (253) STEEL SERVICES ALONG STREETS IN CITY OF ROUND ROCK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR SYSTEM INTEGRITY SEPTEMBER 651 080.56722 7 INSTALL 565 FEET OF 4 INCH AND 955 FEET OF 2 INCH POLY ALONG SAN FERNANDO STREET AND ABANDON 565 FEET OF 8 INCH AND 770 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 652 080.56723 (6) INSTALL 1865 FEET OF 4 INCH POLY ALONG SAN FERNANDO WAY AND ABANDON 1865 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 653 080.56724 6 INSTALL 2065 FEET OF 4 INCH POLY AND ABANDON 1345 FEET OF 4 INCH CAST IRON, 270 FEET OF 4 INCH, 10 FEET OF 6 INCH, AND 15 FEET OF 8 INCH POLY ALONG SAN FERNANDO WAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 654 080.56726 1 INSTALL (253) POLY SERVICES AND ABANDON (253) STEEL SERVICES ALONG STREETS IN CITY OF DESOTO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY SEPTEMBER 655 080.56731 1 RELOCATE FACILITIES. INSTALL 60 FEET OF 2 INCH POLY ALONG MONTCLAIR PLACE AND ABANDON 4 FEET OF 2 INCH STEEL AND 66 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES SEPTEMBER 656 080.56735 248 INSTALL 1485 FEET OF 2 INCH POLY ALONG NEWMORE AVENUE AND ABANDON 1840 FEET OF 4 INCH AND 436 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 657 080.56739 1 INSTALL 1445 FEET OF 2 INCH POLY ALONG MALCOLM X AND ABANDON 1000 FEET OF 4 INCH AND 445 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 20 of 178 239 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 658 080.56743 9 RELOCATE FACILITIES. INSTALL 2995 FEET OF 4 INCH POLY AND ABANDON 2074 FEET OF 4 INCH CAST IRON AND 694 FEET OF 4 INCH AND 200 FEET OF 2 INCH STEEL ALONG COVELLO AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 659 080.56747 (0) INSTALL 1340 FEET OF 2 INCH POLY ALONG CANTERBURY AND ABANDON 1340 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 660 080.56756 1 INSTALL 300 FEET OF 2 INCH POLY AND 80 FEET OF 4 INCH POLY ALONG NORTH BEATON STREET AND ABANDON 300 FEET OF 2 INCH AND 80 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER 661 080.56800 27 INSTALL 1000 FEET OF 8 INCH POLY ALONG KIEST ROAD AND ABANDON 1000 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 662 080.56809 0 INSTALL 1550 FEET OF 4 INCH POLY AND ABANDON 1490 FEET OF 6 INCH CAST IRON ALONG TAOS ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 663 080.56810 53 INSTALL 1215 FEET OF 4 INCH AND 135 FEET OF 2 INCH POLY ALONG EASTERN AVENUE AND ABANDON 1146 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 664 080.56817 (0) INSTALL DISTRICT REGULATOR STATION 10, 78 FEET OF 4 INCH STEEL AND 80 FEET OF 6 INCH POLY IN ARLINGTON AND ABANDON DISTRICT REGULATOR STATION, 15 FEET OF 2 INCH STEEL AND 75 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY SEPTEMBER 665 080.56826 0 RELOCATE FACILITIES. ABANDON 1800 FEET OF 3 INCH POLY ON WEBB FERRELL ROAD NORTH OF RED DEER WAY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES SEPTEMBER 666 080.56828 0 RELOCATE FACILITIES. INSTALL 1400 FEET OF 4 INCH POLY ALONG FARM TO MARKET 709 AND ABANDON 1400 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA RELOCATION OF FACILITIES SEPTEMBER 667 080.56855 8,317 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY BURKBURNETT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURKBURNETT SYSTEM INTEGRITY OCTOBER 668 080.56856 4,166 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY HOLLIDAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOLLIDAY SYSTEM INTEGRITY OCTOBER 669 080.56857 (1,789) FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY ELECTRA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY OCTOBER 670 080.56858 334,702 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY WICHITA FALLS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 671 080.56860 265,000 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY MCCGREGOR IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGOR SYSTEM INTEGRITY OCTOBER 672 080.56861 9 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY OSCEOLA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OSCEOLA SYSTEM INTEGRITY OCTOBER 673 080.56862 191,266 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY MARLIN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY OCTOBER 674 080.56863 443,091 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY WACO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 675 080.56864 178,463 WEST AREA REPLACEMENTS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST SYSTEM INTEGRITY OCTOBER 676 080.56865 62,946 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY HILLSBORO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 677 080.56866 8,956 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY BALLINGER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY OCTOBER 678 080.56867 336,282 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY SAN ANGELO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 679 080.56869 0 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY WINTERS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WINTERS SYSTEM INTEGRITY SEPTEMBER 680 080.56870 79 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY COLEMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY OCTOBER 681 080.56871 6,443 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY COMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY OCTOBER 682 080.56872 6 BLANKET AREA REPLACEMENT AS PART OF THE TEXAS RULE 8.209. ALL CUSTOMERS BLANKET SYSTEM INTEGRITY OCTOBER 683 080.56873 18,603 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY BROWNWOOD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER 684 080.56874 14,453 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY ALBANY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY SYSTEM INTEGRITY OCTOBER 685 080.56875 (17) BAIRD AREA REPLACEMENTS AS PART OF THE TEXAS RULE 8.209. ALL CUSTOMERS BAIRD SYSTEM INTEGRITY OCTOBER 686 080.56876 321,066 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY ABILENE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 687 080.56882 5 INSTALL 1620 FEET OF 2 INCH POLY ALONG WOODCREST AND ABANDON 1551 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 688 080.56884 159 INSTALL 1045 FEET OF 2 INCH AND 325 FEET OF 4 INCH POLY ALONG WOODCREST STREET AND ABANDON 1045 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 689 080.56891 0 INSTALL 1080 FEET OF 4 INCH, 2100 FEET OF 2 INCH POLY ALONG LITTLE JOHN STREET AND ABANDON 1080 FEET OF 6 INCH, 2150 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 690 080.56897 (0) INSTALL 550 FEET OF 4 INCH POLY ALONG COPELAND ROAD AND ABANDON 550 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER 691 080.56904 1 INSTALL 700 FEET OF 2 INCH AND 515 FEET OF 4 INCH POLY ALONG SAN CRISTOBAL AND ABANDON 642 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 692 080.56917 (0) INSTALL 1900 FEET OF 2 INCH POLY ALONG MALCOLM X STREET AND ABANDON 1850 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 693 080.56918 245 INSTALL 1980 FEET OF 2 INCH POLY ALONG BRIGHAM AND ABANDON 260 FEET OF 4 INCH AND 1585 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 694 080.56919 70 INSTALL 1781 FEET OF 2 INCH POLY ALONG SUPERIOR AND ABANDON 1367 FEET OF 4 INCH AND 310 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 695 080.56920 319 INSTALL 2170 FEET OF 2 INCH POLY AND ABANDON 2100 FEET OF 4 INCH AND 2220 FEET OF 6 INCH CAST IRON ALONG SOUTHLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER MTX Additions Page 21 of 178 240 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 696 080.56921 3 INSTALL 1070 FEET OF 2 INCH POLY AND ABANDON 690 FEET OF 4 INCH AND 380 FEET OF 6 INCH CAST IRON ALONG YORK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 697 080.56922 0 INSTALL 1280 FEET OF 2 INCH POLY ALONG KENNISON ROAD AND ABANDON 1210 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 698 080.56928 1 RELOCATE FACILITIES. INSTALL 560 FEET OF 4 INCH POLY ALONG BAYLOR STREET AND ABANDON 52 FEET OF 2 INCH AND 351 FEET OF 4 INCH STEEL AND 148 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS RELOCATION OF FACILITIES SEPTEMBER 699 080.56938 8 INSTALL 1870 FEET OF 2 INCH AND 675 FEET OF 4 INCH POLY AND ABANDON 1165 FEET OF 4 INCH AND 1040 FEET OF 6 INCH CAST IRON ALONG E GREENWAY BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 700 080.56949 (0) RELOCATE FACILITIES. INSTALL 600 FEET OF 8 INCH POLY ALONG PURINGTON AVENUE AND ABANDON 600 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 701 080.56953 38,744 INSTALL 800 FEET OF 10 INCH STEEL ALONG LINE B AND ABANDON 300 FEET OF 10 INCH STEEL ALONG HASLET ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 702 080.56974 1 RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY ALONG GREENBRIER ROAD AND ABANDON 764 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE RELOCATION OF FACILITIES SEPTEMBER 703 080.56975 34 INSTALL 1665 FEET OF 2 INCH POLY ALONG WASHINGTON AND ABANDON 1570 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 704 080.56981 18 INSTALL METER ALONG CEMENTARY CALLOWAY ROAD AND ABANDON METER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY SEPTEMBER 705 080.56988 0 RELOCATE FACILITIES. INSTALL 1325 FEET OF 2 INCH AND 75 FEET OF 4 INCH POLY ALONG OAK STREET AND ABANDON 1442 FEET OF 2 INCH AND 118 FEET OF 4 INCH STEEL AND 275 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF STEPHENVILLE STREET IMPROVEMENT PROJECT IN ACCORDACE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE RELOCATION OF FACILITIES SEPTEMBER 706 080.56989 4 INSTALL 1620 FEET OF 2 INCH POLY ALONG NEWPORT ROAD AND ABANDON 1335 FEET OF 4 INCH CAST IRON AND 235 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 707 080.56991 4 RELOCATE FACILITIES. INSTALL 1,500 FEET OF 2 INCH POLY ALONG ROE STREET AND ABANDON 1,500 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF WHITE SETTLEMENT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT RELOCATION OF FACILITIES SEPTEMBER 708 080.56995 2 RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG VIRGINIA STREET AND ABANDON 885 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES SEPTEMBER 709 080.57011 0 RELOCATE FACILITIES. INSTALL 424 FEET OF 2 INCH POLY AND ABANDON 321 FEET OF 2 INCH POLY ALONG BURSEY ROAD TO ACCOMMODATE CITY OF WATAUGA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WATAUGA RELOCATION OF FACILITIES SEPTEMBER 710 080.57013 4 INSTALL 1510 FEET OF 2 INCH POLY AND ABANDON 975 FEET OF 4 INCH AND 470 FEET OF 3 INCH CAST IRON ALONG SOUTH EDGEFIELD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 711 080.57045 86 RELOCATE FACILITIES. INSTALL 46 FEET OF 16 INCH STEEL AND ABANDON 40 FEET OF 16 INCH STEEL TO ACCOMMODATE DALLAS COUNTY RIVERFRONT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 712 080.57053 5 INSTALL 1410 FEET OF 2 INCH POLY AND ABANDON 785 FEET OF 4 INCH, 585 FEET OF 6 INCH CAST IRON, 270 FEET OF 2 INCH, AND 220 FEET OF 6 INCH STEEL ALONG ALLISON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 713 080.57058 4 RELOCATE FACILITIES. INSTALL 1689 FEET OF 4 INCH POLY ALONG 4TH STREET AND ABANDON 1316 FEET OF 4 INCH CAST IRON AND 373 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 714 080.57061 1 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY MEXIA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY OCTOBER 715 080.57063 106,055 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY WORTHAM IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM SYSTEM INTEGRITY OCTOBER 716 080.57069 4 RELOCATE FACILITIES. INSTALL 1800 FEET OF 4 INCH AND 2065 FEET OF 2 INCH POLY ALONG MOUNT VERNON AVENUE AND ABANDON 1050 FEET OF 6 INCH, 1330 FEET OF 2 INCH STEEL, 50 FEET OF 6 INCH, 630 FEET OF 4 INCH, 60 FEET OF 2 INCH POLY, 635 FEET OF 4 INCH, AND 750 OF 3 INCH CAST IRON, 1330 FEET OF 2 INCH STEEL AND 60 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 717 080.57070 16 RELOCATE FACILITIES. INSTALL 1480 FEET OF 4 INCH POLY ALONG MILLETT ROAD,315 FEET OF 2 INCH POLY AND ABANDON 1480 FEET OF 4 INCH AND 315 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 718 080.57071 6 INSTALL 615 FEET OF 2 INCH AND 1300 FEET OF 4 INCH POLY AND ABANDON 365 FEET OF 4 INCH AND 1305 FEET OF 6 INCH CAST IRON ALONG ROSS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 719 080.57072 6 INSTALL 2615 FEET OF 2 INCH AND 900 FEET OF 4 INCH POLY AND ABANDON 1405 FEET OF 6 INCH AND 1460 FEET OF 4 INCH CAST IRON AND 45 FEET OF 1.25 INCH AND 95 FEET OF 4 INCH STEEL ALONG GRASSMERE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER 720 080.57076 0 INSTALL 620 FEET OF 2 INCH AND 775 FEET OF 4 INCH POLY AND ABANDON 1395 FEET OF 4 INCH AND 390 FEET OF 6 INCH CAST IRON ALONG KENWELL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 721 080.57090 1 INSTALL 1260 FEET OF 2 INCH POLY AND ABANDON 40 FEET OF 3 INCH AND 1375 FEET OF 6 INCH CAST IRON ALONG THE STREETS OF SAN CRISTOBAL AND WHITE ROCK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 722 080.57104 0 INSTALL 340 FEET OF 8 INCH AND 10 FEET OF 2 INCH POLY ALONG BOSQUE BOULEVARD AND ABANDON 350 FEET OF 8 INCH, AND 10 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER 723 080.57123 0 RELOCATE FACILITIES. INSTALL 1610 FEET OF 6 INCH POLY AND ABANDON 1200 FEET OF 4 INCH STEEL AND 400 FEET OF 4 INCH POLY ALONG COLEMAN STREET TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE RELOCATION OF FACILITIES SEPTEMBER 724 080.57134 5 INSTALL 2500 FEET OF 2 INCH POLY ALONG 13TH STREET AND ABANDON 2500 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER 725 080.57147 2,364 INSTALL PANEL, COMMUNICATIONS AND ELECTRICAL EQUIPMENT ON MAINLINE VALVE AND AN ACTUATOR ALONG FINLEY ROAD IN DALLAS COUNTY. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER MTX Additions Page 22 of 178 241 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 726 080.57171 147 RELOCATE FACILITIES. INSTALL 2518 FEET OF 2 INCH, 569 FEET OF 4 INCH, 10 FEET OF 6 INCH AND 1255 FEET OF 8 INCH POLY ALONG MOUNT VERNON AVENUE AND ABANDON 370 FEET OF 2 INCH, 951 FEET OF 3 INCH, 500 FEET OF 4 INCH, 1613 FEET OF 6 INCH, 1050 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 727 080.57193 0 RELOCATE FACILITIES. INSTALL 1260 FEET OF 2 INCH POLY AND ABANDON 1190 FEET OF 2 INCH STEEL AND 110 FEET OF 2 INCH POLY ALONG CEDAR STREET TO ACCOMMODATE CITY OF CELBURNE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE RELOCATION OF FACILITIES SEPTEMBER 728 080.57202 0 INSTALL 825 FEET OF 2 INCH AND 4 INCH POLY ALONG VICTORIA AND ABANDON 1600 FEET OF 6, 4, 3 AND 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY SEPTEMBER 729 080.57225 (0) INSTALL (6) VALVES AND ABANDON DISTRICT REGULATOR STATION ALONG XT25 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY SEPTEMBER 730 080.57240 9 INSTALL 3000 FEET OF 2 INCH POLY AND ABANDON 1575 FEET OF 4 INCH CAST IRON AND 1475 FEET STEEL ALONG LOWDEN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 731 080.57247 0 RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY AND ABANDON 175 FEET OF 4 INCH POLY ALONG KINGSFORT PARKWAY TO ACCOMMODATE CITY OF KAUFMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN RELOCATION OF FACILITIES SEPTEMBER 732 080.57248 (2) RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY ALONG SHILOH ROAD AND ABANDON 350 FEET OF 4 INCH POLY TO ACCOMMODATE PLANO ROAD PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES SEPTEMBER 733 080.57259 1 INSTALL 700 FEET OF 4 INCH POLY ALONG AIRPORT ROAD AND ABANDON 690 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY SEPTEMBER 734 080.57261 1,065 RELOCATE FACILITIES. INSTALL 5000 FEET OF 4 INCH AND 7500 FEET OF 2 INCH POLY ALONG FOURTH STREET AND ABANDON 4900 FEET OF 4 INCH, 6000 FEET OF 2 INCH AND 1500 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF KAUFMAN ROAD AND DRAINAGE IMPROVEMENTS PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN RELOCATION OF FACILITIES OCTOBER 735 080.57262 1 RELOCATE FACILITIES. INSTALL 580 FEET OF 4 INCH POLY ALONG BOB JONES ROAD AND ABANDON 575 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF SOUTHLAKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE RELOCATION OF FACILITIES SEPTEMBER 736 080.57269 4 INSTALL 1253 FEET OF 2 INCH, 2695 FEET OF 4 INCH AND 15 FEET OF 6 INCH POLY AND ABANDON 456 FEET OF 6 INCH STEEL, 800 FEET OF 4 INCH, 1753 FEET OF 6 INCH CAST IRON ALONG COLVIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 737 080.57278 2 INSTALL 1560 FEET OF 6 INCH, 780 FEET OF 4 INCH AND 880 FEET OF 2 INCH POLY ALONG HINTON STREET AND ABANDON 1735 FEET OF 1.25 INCH AND 3 INCH STEEL AND 331 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSON OF TEXAS RULE 8209. ALL CUSTOMERS TIOGA SYSTEM INTEGRITY SEPTEMBER 738 080.57282 70 RELOCATE FACILITIES. INSTALL 13 FEET OF 2 INCH, 6 FEET OF 4 INCH, AND 2347 FEET OF 6 INCH POLY ALONG FISH CREEK ROAD AND ABANDON 61 FEET OF 2 INCH, 55 FEET OF 4 INCH, AND 5280 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES SEPTEMBER 739 080.57285 5 RELOCATE FACILITIES. INSTALL 635 FEET OF 2 INCH POLY AND ABANDON 618 FEET OF 2 INCH STEEL AND 49 FEET OF 2 INCH POLY ALONG ANDREW AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 740 080.57293 3 INSTALL 27 FEET OF 2 INCH, 12 FEET OF 3 INCH, 6 FEET OF 4 INCH, 7 FEET OF 6 INCH AND 2680 FEET OF 8 INCH POLY AND ABANDON 10 FEET OF 2 INCH, 10 FEET OF 3 INCH, 9 FEET OF 6 INCH, 2657 FEET OF 12 INCH AND 10 FEET OF 2 INCH STEEL AND 2 FEET OF 3 INCH POLY AND 10 FEET OF 4 INCH STEEL AND 9 FEET OF 6 INCH STEEL AND 2657 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 741 080.57294 769 INSTALL 3409 FEET OF 2 INCH POLY AND ABANDON 1485 FEET OF 2 INCH AND 417 FEET OF 4 INCH STEEL AND 802 FEET OF 2 INCH AND 126 FEET OF 4 INCH POLY ALONG 20TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 742 080.57296 (0) INSTALL DISTRICT REGULATOR STATION, 13 FEET OF 2 INCH STEEL AND 19 FEET OF 4 INCH STEEL AND ABANDON DISTRICT REGULATOR STATION ALONG RED RIVER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER 743 080.57312 126 INSTALL 752 FEET OF 2 INCH AND 2938 FEET OF 4 INCH POLY ALONG ROCKRIDGE AND ABANDON 700 FEET OF 4 INCH CAST IRON AND 3125 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 744 080.57344 31,340 INSTALL 2700 FEET OF 6 INCH, 2200 FEET OF 4 INCH, AND 6400 FEET OF 2 INCH POLY ALONG STREETS OF LIVELY PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH NOVEMBER 745 080.57348 0 RELOCATE FACILITIES. INSTALL 29 FEET OF 4 INCH POLY AND 1116 FEET OF 8 INCH POLY AND ABANDON 4 FEET OF 4 INCH, 132 FEET OF 8 INCH POLY AND 8 FEET OF 3 INCH AND 366 FEET OF 12 INCH STEEL ALONG LAMAR STREET TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 746 080.57370 0 INSTALL 400 FEET OF 6 INCH POLY ALONG WATERCROSS DRIVE AND ABANDON 400 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 747 080.57371 3 RELOCATE FACILITIES. INSTALL 1070 FEET OF 2 INCH POLY ALONG EVANS AVENUE AND ABANDON 330 FEET OF 6 INCH, 420 FEET OF 4 INCH CAST IRON, 50 FEET OF 6 INCH, AND 205 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 748 080.57374 0 INSTALL 1525 FEET OF 2 INCH POLY ALONG 5TH STREET AND ABANDON 872 FEET OF 2 INCH, 298 FEET OF 4 INCH STEEL AND 398 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM SYSTEM INTEGRITY SEPTEMBER 749 080.57388 1 RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY AND ABANDON 383 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES SEPTEMBER 750 080.57391 7 INSTALL 2260 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 6 INCH AND 1301 FEET OF 8 INCH CAST IRON ALONG LAKEWOOD BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 751 080.57392 31 RELOCATE FACILITIES. INSTALL 1075 FEET OF 2 INCH POLY ALONG TRIGG STREET AND ABANDON 1071 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE RELOCATION OF FACILITIES SEPTEMBER 752 080.57393 40 RELOCATE FACILITIES. INSTALL 1078 FEET OF 2 INCH POLY ALONG STRALEY AVENUE AND ABANDON1081 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE RELOCATION OF FACILITIES SEPTEMBER 753 080.57396 44 RELOCATE FACILITIES. INSTALL 1235 FEET OF 2 INCH POLY ALONG LYLE STREET AND ABANDON 1238 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE RELOCATION OF FACILITIES SEPTEMBER MTX Additions Page 23 of 178 242 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 754 080.57397 57 RELOCATE FACILITIES. INSTALL 1100 FEET OF 2 INCH POLY ALONG COLEMAN STREET AND ABANDON 1100 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE RELOCATION OF FACILITIES SEPTEMBER 755 080.57399 40 RELOCATE FACILITIES. INSTALL 1279 FEET OF 2 INCH POLY ALONG ATON AVENUE AND ABANDON 1213 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE RELOCATION OF FACILITIES SEPTEMBER 756 080.57400 125 INSTALL 1460 FEET OF 4 INCH POLY AND ABANDON 1455 FEET OF 4 INCH CAST IRON ALONG POMONA ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 757 080.57402 92 INSTALL 1865 FEET OF 4 INCH POLY AND ABANDON 1865 FEET OF 4 INCH CAST IRON ALONG TAOS ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 758 080.57405 122 INSTALL 1934 FEET OF 2 INCH POLY AND ABANDON 780 FEET OF 4 INCH AND 735 FEET OF 6 INCH CAST IRON ALONG SOUTH CATERBURY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 759 080.57406 48 INSTALL 885 FEET OF 2 INCH AND 540 FEET OF 4 INCH POLY ALONG KESSLER CANYON AND ABANDON 1225 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 760 080.57419 1 RELOCATE FACILITIES. INSTALL 86 FEET OF 4 INCH POLY AND ABANDON 170 FEET OF 2 INCH, 132 FEET OF 3 INCH STEEL AND 80 FEET OF 2 INCH POLY AND ALONG PECAN STREET TO ACCOMMODATE CITY OF HUTTO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HUTTO RELOCATION OF FACILITIES SEPTEMBER 761 080.57431 (0) RELOCATE FACILITIES. INSTALL 800 FEET OF 4 INCH POLY ALONG OAKWOOD AND ABANDON 790 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF BALCH SPRINGS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALCH SPRINGS RELOCATION OF FACILITIES SEPTEMBER 762 080.57435 (11) INSTALL 13 FEET OF 2 INCH AND 1424 FEET OF 6 INCH POLY AND ABANDON 13 FEET OF 2 INCH POLY AND 1419 FEET OF 4 INCH STEEL ALONG HORSESHOE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SPRINGTOWN SYSTEM INTEGRITY SEPTEMBER 763 080.57437 113 INSTALL 1565 FEET OF 6 INCH STEEL ALONG AVENUE J ON LINE U AND ABANDON 1548 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCCAULLEY SYSTEM INTEGRITY OCTOBER 764 080.57446 (0) INSTALL (1) 120 WELD SLEEVE ON LINE D IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY SEPTEMBER 765 080.57448 382,965 INSTALL 3200 FEET OF 16 INCH STEEL ALONG LINE C16 AND ABANDON 3200 FEET OF 16 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEDFORD SYSTEM INTEGRITY OCTOBER 766 080.57478 (0) INSTALL 20 FEET OF 8 INCH STEEL ALONG ARAPAHO ROAD AND ABANDON 20 FEET OF 8 INCH OF STEEL AND (ONE) 3 INCH VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY SEPTEMBER 767 080.57492 (0) INSTALL 2 INCH DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION IN CITY OF ITALY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ITALY SYSTEM INTEGRITY SEPTEMBER 768 080.57493 (0) INSTALL 268 FEET OF 4 INCH POLY AND ABANDON 145 FEET OF 3 INCH STEEL ALONG OAK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER 769 080.57497 0 INSTALL 1747 FEET OF 4 INCH POLY AND ABANDON 1755 FEET OF 4 INCH STEEL ALONG WALNUT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 770 080.57498 0 INSTALL 3100 FEET OF 2 INCH POLY ALONG STADIUM DRIVE ABANDON 1647 FEET OF 2 INCH, AND 432 FEET OF 4 INCH STEEL, 613 FEET OF 2 INCH AND 132 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALVORD SYSTEM INTEGRITY SEPTEMBER 771 080.57499 24 INSTALL 4066 FEET OF 2 INCH POLY AND ABANDON 2281 FEET OF 4 INCH CAST IRON AND 1051 FEET OF 4 INCH STEEL ALONG ARLINGTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 772 080.57502 7 INSTALL 1620 FEET OF 2 INCH POLY AND ABANDON 970 FEET OF 4 INCH AND 340 FEET OF 8 INCH CAST IRON ALONG MARNE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 773 080.57503 11 INSTALL 1563 FEET OF 2 INCH POLY AND ABANDON 1890 FEET OF 4 INCH CAST IRON ALONG STEPHENSON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 774 080.57508 25 INSTALL 1566 FEET OF 4 INCH POLY AND ABANDON 1425 FEET OF 6 INCH, 1350 FEET OF 4 INCH CAST IRON AND 400 FEET OF 4 INCH STEEL ALONG SOUTH HILLS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 775 080.57509 1 INSTALL 1940 FEET OF 2 INCH POLY ALONG SAN CRISTOBAL ROAD AND ABANDON 2155 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 776 080.57510 1 INSTALL 1185 FEET OF 2 INCH POLY AND 355 FEET OF 4 INCH AND ABANDON 1531 FEET OF 6 INCH CAST IRON ALONG SAN LEANDRO STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 777 080.57525 94 INSTALL 1268 FEET OF 4 INCH POLY ALONG ASBURY ALLEY AND ABANDON 240 FEET OF 6 INCH STEEL AND 1490 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 778 080.57528 124 INSTALL 2671 FEET OF 4 INCH POLY ALONG MISSION AVENUE AND ABANDON 2000 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 779 080.57529 1 RELOCATE FACILITIES. INSTALL 620 FEET OF 2 INCH POLY AND ABANDON 645 FEET OF 4 INCH STEEL ALONG LOCUST ROAD TO ACCOMMODATE THE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 780 080.57540 21 INSTALL 330 FEET OF 2 INCH AND 1760 FEET OF 6 INCH POLY AND ABANDON 785 FEET OF 4 INCH, 330 FEET OF 6 INCH, AND 960 FEET OF 8 INCH CAST IRON ALONG ERVAY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 781 080.57549 1 INSTALL 1675 FEET OF 2 INCH POLY AND ABANDON 1655 FEET OF 8 INCH CAST IRON ALONG HOLLIS DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 782 080.57551 28 INSTALL 1464 FEET OF 2 INCH POLY ALONG LINCOLN AND ABANDON 1495 FEET OF 4 INCH CAST IRON, 80 FEET OF 4 INCH POLY, 30 FEET OF 4 INCH AND 65 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 783 080.57552 7 INSTALL 1550 FEET OF 2 INCH POLY AND ABANDON 1270 FEET OF 4 INCH CAST IRON ALONG TIMOTHY DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 784 080.57568 125 RELOCATE FACILITIES. INSTALL 2898 FEET OF 4 INCH POLY ALONG GALVEZ AND ABANDON 1607 FEET OF 4 INCH CAST IRON AND 1000 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 785 080.57579 2 INSTALL 1100 FEET OF 6 INCH AND 150 FEET OF 2 INCH POLY ALONG 22ND STREET AND ABANDON 1100 FEET OF 8 INCH AND 150 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER 786 080.57580 4 RELOCATE FACILITIES. INSTALL 1124 FEET OF 2 INCH POLY AND ABANDON 464 FEET OF 2 INCH STEEL AND 646 FEET OF 2 INCH POLY ALONG ROBIN LANE TO ACCOMMODATE CITY OF BERTRAM STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BERTRAM RELOCATION OF FACILITIES SEPTEMBER 787 080.57607 0 RELOCATE FACILITIES. INSTALL 265 FEET OF 2 INCH POLY AND ABANDON 370 FEET OF 3 INCH STEEL ALONG RANDOLPH STREET TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES SEPTEMBER MTX Additions Page 24 of 178 243 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 788 080.57615 14 RELOCATE FACILITIES. INSTALL (99) POLY SERVICES AND ABANDON (99) STEEL SERVICES ALONG CAPITAL STREET TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES SEPTEMBER 789 080.57629 14 INSTALL (25) MOTORIZED REGULATORS AND ABANDON (25) REGULATORS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 790 080.57630 (0) INSTALL 15 FEET OF 2 INCH, 3 FEET OF 3 INCH AND 1441 FEET OF 4 INCH POLY AND ABANDON 12 FEET OF 2 INCH, 2732 FEET OF 3 INCH AND 16 FEET OF 4 INCH POLY ALONG KNOLLWOOD ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER 791 080.57632 (0) INSTALL 107 FEET OF 2 INCH AND 377 FEET OF 4 INCH POLY AND ABANDON 282 FEET OF 2 INCH AND 191 FEET OF 4 INCH STEEL AND 47 FEET OF 2 INCH AND 11 FEET OF 4 INCH POLY ALONG JACKSON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLEN ROSE SYSTEM INTEGRITY SEPTEMBER 792 080.57658 77 INSTALL 974 FEET OF 2 INCH AND 1451 FEET OF 4 INCH POLY AND ABANDON 1054 FEET OF 3 INCH AND 1600 FEET OF 6 INCH CAST IRON ALONG HILLCREST AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER 793 080.57665 165 INSTALL 8 FEET OF 4 INCH AND 64 FEET OF 12 INCH STEEL ALONG MIDWAY ROAD AND ABANDON 7 FEET OF 4 INCH AND 70 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER 794 080.57672 9 INSTALL 2691 FEET OF 2 INCH POLY AND ABANDON 1595 FEET OF 6 INCH, 1405 FEET OF 4 INCH CAST IRON, AND 40 FEET OF 6 INCH POLY ALONG GRASSMERE LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER 795 080.57675 0 INSTALL 1000 FEET OF 2 INCH POLY ALONG FORT STREET AND ABANDON 1000 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE SYSTEM INTEGRITY SEPTEMBER 796 080.57679 135 INSTALL 2830 FEET OF 4 INCH POLY ALONG HARVARD AVENUE AND ABANDON 2090 FEET OF 4 INCH, 500 FEET OF 8 INCH, AND 380 FEET OF 6 INCH CAST IRON, AND 360 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER 797 080.57693 9 INSTALL 2373 FEET OF 8 INCH STEEL AND ABANDON 2373 FEET OF 8 INCH STEEL ALONG COUNTY ROAD 230 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEINERT SYSTEM INTEGRITY SEPTEMBER 798 080.57697 (0) INSTALL 660 FEET OF 2 INCH POLY AND ABANDON 660 FEET OF 2 INCH STEEL ALONG GOSSETT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 799 080.57703 2 INSTALL 12983 FEET OF 4 INCH STEEL AND ABANDON 12988 FEET OF 4 INCH STEEL ALONG LINE L26 IN COUNTY FALLS COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LOTT SYSTEM INTEGRITY SEPTEMBER 800 080.57711 1 RELOCATE FACILITIES. INSTALL 2500 FEET OF 4 INCH POLY ALONG NATIONAL DRIVE AND ABANDON 2500 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS RELOCATION OF FACILITIES SEPTEMBER 801 080.57716 (0) INSTALL 300 FEET OF 2 INCH POLY ALONG CADDO STREET AND ABANDON 300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LIPAN SYSTEM INTEGRITY SEPTEMBER 802 080.57725 107 INSTALL 785 FEET OF 4 INCH AND 595 FEET OF 2 INCH POLY ALONG HUDNALL AND ABANDON 660 FEET OF 8 INCH, 360 FEET OF 4 INCH AND 235 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 803 080.57729 0 RELOCATE FACILITIES. INSTALL 17 FEET OF 3 INCH AND 504 FEET OF 4 INCH POLY AND ABANDON 500 FEET OF 4 INCH POLY ALONG AUSTIN STREET TO ACCOMMODATE CITY OF KAUFMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN RELOCATION OF FACILITIES SEPTEMBER 804 080.57747 9 INSTALL 1099 FEET OF 4 INCH POLY AND ABANDON 1005 FEET OF 4 INCH CAST IRON ALONG HOPKINS ALLEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 805 080.57753 1 INSTALL 1469 FEET OF 2 INCH POLY AND ABANDON 720 FEET OF 6 INCH CAST IRON ALONG MAYFLOWER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 806 080.57754 70 INSTALL 2150 FEET OF 2 INCH POLY ALONG WEST COLORADO ROAD AND ABANDON 1130 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 807 080.57755 0 RELOCATE FACILITIES. INSTALL 212 FEET OF 6 INCH POLY AND ABANDON 204 FEET OF 6 INCH CAST IRON ALONG WEST HAMMOND STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 808 080.57756 32 INSTALL DISTRICT REGULATOR STATION AND VALVE AND ABANDON DISTRICT REGULATOR STATION 58 ALONG BELT LINE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 809 080.57757 (0) RELOCATE FACILITIES. INSTALL 216 FEET OF 6 INCH POLY AND ABANDON 204 FEET OF 6 INCH STEEL ALONG HEMPHILL STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 810 080.57758 1 INSTALL 765 FEET OF 4 INCH POLY AND ABANDON 120 FEET OF 4 INCH AND 610 FEET OF 8 INCH STEEL ALONG WALNUT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER 811 080.57763 2 RELOCATE FACILITIES. INSTALL 897 FEET OF 4 INCH AND 2 FEET OF 6 INCH POLY AND ABANDON 564 FEET OF 4 INCH CAST IRON ALONG CARTWRIGHT AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 812 080.57767 10 INSTALL 1268 FEET OF 2 INCH POLY AND ABANDON 1362 FEET OF 2 INCH POLY ALONG RONIN LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BERTRAM SYSTEM INTEGRITY SEPTEMBER 813 080.57795 34 RELOCATE FACILITIES. INSTALL 585 FEET OF 2 INCH POLY ALONG PEARSON AVENUE AND ABANDON 200 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES SEPTEMBER 814 080.57796 20 RELOCATE FACILITIES. INSTALL 6 POLY SERVICES ALONG TUCKER STREET AND ABANDON (6) STEEL SERVICES TO ACCOMMODATE THE CITY OF MCKINNEY CAPITAL IMPROVEMENT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES SEPTEMBER 815 080.57800 36 INSTALL 800 FEET OF 4 INCH POLY AND 200 FEET OF 8 INCH STEEL ALONG KATY STREET AND ABANDON 800 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMO SYSTEM INTEGRITY SEPTEMBER 816 080.57809 (0) INSTALL 13 FEET OF 2 INCH AND 737 FEET OF 4 INCH POLY AND ABANDON 725 FEET OF 2 INCH STEEL AND 8 FEET OF 2 INCH POLY ALONG BEZNER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LINDSAY SYSTEM INTEGRITY SEPTEMBER 817 080.57818 1 INSTALL 430 FEET OF 2 INCH POLY ALONG ECHOLS STREET AND ABANDON 465 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER 818 080.57820 (0) INSTALL 671 FEET OF 2 INCH POLY AND ABANDON 200 FEET OF 2 INCH STEEL AND 322 FEET OF 2 INCH POLY ALONG PLUM STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALDWELL SYSTEM INTEGRITY SEPTEMBER 819 080.57823 72 INSTALL 1810 FEET OF 2 INCH POLY ALONG INWOOD ROAD AND ABANDON 1425 FEET OF 4 INCH CAST IRON AND 385 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 820 080.57824 271 RELOCATE FACILITIES. INSTALL 2064 FEET OF 24 INCH STEEL ALONG WHEATLAND ROAD AND ABANDON 1263 FEET OF 24 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER MTX Additions Page 25 of 178 244 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 821 080.57848 0 RELOCATE FACILITIES. INSTALL 720 FEET OF 2 INCH POLY ALONG CADDO STREET AND ABANDON 105 FEET OF 2 INCH POLY AND 439 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF LIPAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LIPAN RELOCATION OF FACILITIES SEPTEMBER 822 080.57852 4 RELOCATE FACILITIES. INSTALL 2456 FEET OF 2 INCH AND 3212 FEET OF 4 INCH POLY ALONG CHIMNEY HILL DRIVE AND ABANDON 903 FEET OF 2 INCH AND 2080 FEET OF 3 INCH STEEL AND 1371 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES SEPTEMBER 823 080.57856 79 INSTALL 1768 FEET OF 2 INCH AND 374 FEET OF 4 INCH POLY ALONG GREENWAY BOULEVARD AND ABANDON 1370 FEET OF 4 INCH AND 385 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 824 080.57859 97 INSTALL 1595 FEET OF 4 INCH AND 355 FEET OF 2 INCH POLY ALONG NEWMORE STREET AND ABANDON 1595 FEET OF 6 FEET CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 825 080.57861 336 INSTALL 1120 FEET OF 2 INCH POLY AND 545 FEET OF 4 INCH POLY ALONG MUNGER AVENUE. ABANDON 1105 FEET OF 4 INCH CAST IRON AND 1200 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 826 080.57866 61 INSTALL 1634 FEET OF 2 INCH AND 710 FEET OF 4 INCH POLY ALONG NICHOLS STREET AND ABANDON 114 FEET OF 2 INCH POLY, 3150 FEET OF 4 INCH CAST IRON, 925 FEET OF 4 INCH STEEL, AND 326 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 827 080.57874 106 INSTALL 1440 FEET OF 4 INCH POLY ALONG ROSS AVENUE AND ABANDON 10 FEET OF 4 INCH CAST IRON AND 1440 FEET OF 6 INCH CAST IRON AND 175 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 828 080.57877 79 INSTALL 600 FEET OF 4 INCH AND ABANDON 600 FEET OF STEEL ALONG LINE W12- 1 IN WISE COUNTY IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY SEPTEMBER 829 080.57879 33 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION 01 IN CITY OF TERRELL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY SEPTEMBER 830 080.57902 0 RELOCATE FACILITIES. INSTALL 56 FEET OF 6 INCH POLY ALONG PECAN LANE AND ABANDON 56 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF MELISSA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA RELOCATION OF FACILITIES SEPTEMBER 831 080.57904 4 INSTALL 1615 FEET OF 2 INCH POLY ALONG SUDBURY DRIVE AND ABANDON 1591 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 832 080.57908 84 INSTALL 1035 FEET OF 2 INCH POLY ALONG EDGEFIELD STREET AND ABANDON 862 FEET OF 4 INCH AND 102 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 833 080.57909 (0) RELOCATE FACILITIES. INSTALL 116 FEET OF 4 INCH POLY ALONG FAIRWAY STREET AND ABANDON 113 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES SEPTEMBER 834 080.57914 35 INSTALL 925 FEET OF 2 INCH AND 344 FEET OF 4 INCH POLY ALONG RAVENDALE LANE AND ABANDON 915 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 835 080.57915 87 INSTALL 1730 FEET OF 2 INCH POLY AND ABANDON 1095 FEET OF 4 INCH AND 630 FEET OF 6 INCH CAST IRON ALONG AVALON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 836 080.57916 0 RELOCATE FACILITIES. INSTALL 1876 FEET OF 2 INCH POLY ALONG THE STREET OF ROBINSON AND ABANDON 723 FEET OF 2 INCH AND 6 FEET OF 3 INCH STEEL AND 989 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ROBINSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON RELOCATION OF FACILITIES SEPTEMBER 837 080.57924 4 INSTALL 1732 FEET OF 2 INCH POLY ALONG MLK BOULEVARD AND ABANDON 8 FEET OF 2 INCH AND 499 FEET OF 4 INCH POLY AND 993 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 838 080.57926 33 INSTALL 1820 FEET OF 2 INCH POLY ALONG MYRTLE STREET AND ABANDON 1240 FEET OF 8 INCH, 330 FEET OF 6 INCH, 120 FEET OF 4 INCH CAST IRON AND 130 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 839 080.57929 5 INSTALL 10 FEET OF 3 INCH AND 1908 FEET OF 4 INCH POLY ALONG DAVIS STREET AND ABANDON 829 FEET OF 3 INCH AND 646 FEET OF 4 INCH STEEL AND 283 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY SEPTEMBER 840 080.57932 1 INSTALL 208 FEET OF 2 INCH, 8 FEET OF 3 INCH AND 1579 FEET OF 4 INCH POLY ALONG DANIELS DRIVE AND ABANDON 208 FEET OF 2 INCH AND 1733 FEET OF 4 INCH STEEL AND 61 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERENS SYSTEM INTEGRITY SEPTEMBER 841 080.57938 1,068 INSTALL 2125 FEET OF 2 INCH AND 3010 FEET OF 4 INCH POLY ALONG ELM STREET AND ABANDON 1738 FEET OF 4 INCH CAST IRON, 2636 FEET OF 4 INCH, 1040 FEET OF 6 INCH STEEL, AND 678 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 842 080.57940 13 INSTALL 500 FEET OF 4 INCH AND 225 FEET OF 2 INCH POLY ALONG ELM STREET AND ABANDON 482 FEET OF 4 INCH AND 200 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER 843 080.57941 15 INSTALL 400 FEET OF 4 INCH AND 220 FEET OF 2 INCH POLY ALONG BRAZOS AND ABANDON 400 FEET OF 4 INCH AND 380 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER 844 080.57944 8 INSTALL 350 FEET OF 2 INCH AND 1800 FEET OF 4 INCH POLY AND ABANDON 2482 FEET OF 4 INCH AND 571 FEET OF 6 INCH CAST IRON AND 2209 FEET OF 4 INCH STEEL ALONG NOBLE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 845 080.57954 10 INSTALL 2 FEET OF 2 INCH AND 3296 FEET OF 4 INCH POLY ALONG RACE STREET AND ABANDON 12 FEET OF 2 INCH AND 3323 FEET OF 4 INCH CAST IRON AND 5 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 846 080.57959 1 RELOCATE FACILITIES. INSTALL 1283 FEET OF 2 INCH, 3 FEET OF 3 INCH AND 2688 FEET OF 4 INCH POLY ALONG LINDA LANE AND ABANDON 8 FEET OF 1.25 INCH, 1027 FEET OF 2 INCH, 2499 FEET OF 3 INCH AND 252 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES SEPTEMBER 847 080.57960 18 INSTALL 1470 FEET OF 2 INCH POLY ALONG POLK STREET AND ABANDON 1380 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 848 080.57963 7 INSTALL 2825 FEET OF 2 INCH AND 359 FEET OF 4 INCH POLY ALONG JUDD STREET AND ABANDON 2616 FEET OF 4 INCH CAST IRON AND 207 FEET OF 4 INCH AND 349 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 849 080.57964 110 RELOCATE FACILITIES. INSTALL 40 FEET OF 8 INCH STEEL AND 40 FEET OF 6 INCH STEEL ALONG FM195 AND ABANDON 10 FEET OF 8 INCH STEEL AND 10 INCH POLY TO ACCOMMODATE CITY OF PARIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS RELOCATION OF FACILITIES SEPTEMBER 850 080.57971 29 INSTALL 930 FEET OF 2 INCH AND 2065 FEET OF 4 INCH POLY ALONG MARSAILIS STREET AND ABANDON 514 FEET OF 2 INCH AND 203 FEET OF 3 INCH AND 1926 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 26 of 178 245 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 851 080.57983 268,945 REPLACE REGULATOR STATIONS AT THE END OF LINE C22 ON THE SOUTHEAST SIDE OF DFW AIRPORT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER 852 080.57985 77,493 INSTALL 22 FEET OF 8 INCH STEEL AND 4926 FEET OF 10 INCH STEEL AND DISTRICT REGULATOR STATION AT DFW AIRPORT AND ABANDON 1213 FEET OF 8 INCH STEEL AND 1690 FEET OF 10 INCH STEEL AND DISTRICT REGULATOR STATION ALONG DFW AIRPORT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY OCTOBER 853 080.57986 58,320 REPLACE MAINLINE VALVE AND STRADDLE ASSEMBLY AND DRS02 AT DFW AIRPORT DUE TO NON-WORKING VALVES AND AGING INFRASTRUCTURE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY OCTOBER 854 080.57990 23 INSTALL DISTRICT REGULATOR STATION ALONG HOLLY AND ABANDON DISTRICT REGULATOR STATION 01 IN CRANDALL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CRANDALL SYSTEM INTEGRITY SEPTEMBER 855 080.57991 7 INSTALL 3302 FEET OF 2 INCH POLY ALONG FERGUSON STREET AND ABANDON 3032 FEET OF 2 INCH STEEL AND 87 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE SYSTEM INTEGRITY SEPTEMBER 856 080.57992 10 INSTALL 1944 FEET OF 2 INCH POLY ALONG SAN LEANDRO STREET AND ABANDON 2012 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 857 080.57993 53 INSTALL 325 FEET OF 2 INCH AND 1350 FEET OF 4 INCH POLY AND ABANDON 1280 FEET OF 6 INCH CAST IRON AND 325 FEET OF 3 INCH POLY ALONG SAN BENITO STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 858 080.57997 125 INSTALL 2450 FEET OF 4 INCH AND 360 FEET OF 6 INCH POLY ALONG BEVERLY AVENUE AND ABANDON 2810 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY SEPTEMBER 859 080.58003 1 INSTALL 845 FEET OF 2 INCH POLY ALONG WILDWOOD ROAD AND ABANDON 937 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 860 080.58009 25 INSTALL 1354 FEET OF 2 INCH POLY ALONG HARWOOD AND ABANDON 345 FEET OF 4 INCH AND 940 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 861 080.58012 27 INSTALL 1101 FEET OF 2 INCH POLY ALONG GANO AND ABANDON 1300 FEET OF 8 INCH STEEL, 530 FEET OF 4 INCH, 785 FEET OF 6 INCH AND 380 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 862 080.58013 (19) INSTALL 105 FEET OF 2 INCH, 32 FEET OF 4 INCH AND 2346 FEET OF 6 INCH POLY ALONG WASHINGTON STREET AND ABANDON 233 FEET OF 2 INCH AND 5 FEET OF 4 INCH POLY AND 5 FEET OF 4 INCH, 6 FEET OF 3 INCH AND 2187 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY SEPTEMBER 863 080.58020 96 INSTALL 2250 FEET OF 2 INCH POLY AND ABANDON 1425 FEET OF 4 INCH, 305 FEET OF 6 INCH CAST IRON AND 170 FEET OF 4 INCH STEEL ALONG EDGEFIELD ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 864 080.58023 46 INSTALL 1507 FEET OF 2 INCH POLY ALONG SIDNEY STREET AND ABANDON 1375 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 865 080.58024 322 INSTALL 1760 FEET OF 2 INCH POLY ALONG TODD STREET AND ABANDON 1520 FEET OF 4 INCH CAST IRON AND 290 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 866 080.58026 16 INSTALL 150 FEET OF 4 INCH POLY AND ABANDON (1) DISTRICT REGULATOR STATION AND 8026 FEET OF 4 INCH STEEL ALONG PLANO ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY SEPTEMBER 867 080.58027 63 INSTALL 1580 FEET OF 2 INCH POLY ALONG TEXAS DRIVE AND ABANDON 1580 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 868 080.58029 20 INSTALL 925 FEET OF 2 INCH POLY AND ABANDON 885 FEET OF 4 INCH CAST IRON ALONG OLD ORCHARD ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 869 080.58034 8 INSTALL 6 FEET OF 3 INCH AND 1749 FEET OF 4 INCH POLY AND ABANDON 1639 FEET OF 3 INCH, 206 FEET OF 4 INCH, 6 FEET OF 6 INCH STEEL AND 2 FEET OF 4 INCH POLY ALONG SYCAMORE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY SEPTEMBER 870 080.58036 45 INSTALL 1520 FEET OF 2 INCH POLY ALONG ROLINDA DRIVE AND ABANDON 1520 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 871 080.58037 192 INSTALL 1805 FEET OF 2 INCH POLY ALONG CUMBERLAND AND ABANDON 1290 FEET OF 4 INCH AND 515 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 872 080.58038 81 INSTALL 1745 FEET OF 2 INCH POLY ALONG STOREY STREET AND ABANDON 1230 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 873 080.58040 38 INSTALL 920 FEET OF 2 INCH AND 667 FEET OF 4 INCH POLY ALONG FOREST HILLS AND ABANDON 525 FEET OF 8 INCH, 695 FEET OF 4 INCH CAST IRON AND 165 FEET OF 8 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 874 080.58042 40 INSTALL 1365 FEET OF 4 INCH POLY ALONG SANTA CLARA AND ABANDON 475 FEET OF 8 INCH AND 775 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 875 080.58051 (0) INSTALL (259) POLY SERVICES AND ABANDON (259) STEEL SERVICES ALONG STREETS IN CITY OF TEMPLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY SEPTEMBER 876 080.58052 12 RELOCATE FACILITIES. INSTALL 27 FEET OF 2 INCH POLY ALONG LONE STAR DRIVE AND ABANDON 546 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CEDAR PARK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR PARK RELOCATION OF FACILITIES SEPTEMBER 877 080.58054 30 INSTALL 5079 FEET OF 4 INCH POLY ALONG HIGHWAY 271 AND ABANDON 7 FEET OF 4 INCH POLY AND 5064 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY SEPTEMBER 878 080.58055 (0) INSTALL (124) POLY SERVICES AND ABANDON (124) STEEL SERVICES ALONG STREETS IN CITY OF GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 879 080.58056 2 INSTALL (160) POLY SERVICES AND ABANDON (160) STEEL SERVICES ALONG STREETS IN CITY OF DESOTO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY SEPTEMBER 880 080.58060 134 INSTALL 3300 FEET OF 4 INCH POLY ALONG BEWICK AND ABANDON 380 FEET OF 6 INCH STEEL, 820 FEET OF 6 INCH, AND 1031 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 881 080.58061 88 RELOCATE FACILITIES. INSTALL 2204 FEET OF 4 INCH POLY AND ABANDON 1950 FEET OF 4 INCH CAST IRON, 692 FEET OF 4 INCH STEEL, 163 FEET OF POLY ALONG COVELO TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 882 080.58085 70 INSTALL 1635 FEET OF 4 INCH POLY ALONG CHEROKEE TRAIL AND ABANDON 1635 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 883 080.58086 75 INSTALL 1875 FEET OF 4 INCH POLY ALONG BLUFFVIEW ROAD AND ABANDON 490 FEET OF 4 INCH CAST IRON, 290 FEET OF 2 INCH STEEL, 660 FEET OF 8 INCH CAST IRON, 85 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 884 080.58087 4 INSTALL (343) POLY SERVICES AND ABANDON (343) STEEL SERVICES ALONG STREETS IN CITY OF ARLINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 27 of 178 246 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 885 080.58088 192 INSTALL (393) POLY SERVICES ALONG STREETS OF ARLINGTON AND ABANDON (393) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 886 080.58099 (0) INSTALL 2207 FEET OF 2 INCH POLY ALONG GAY STREET AND ABANDON 12 FEET OF 1.25 INCH POLY AND 2215 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRANKLIN SYSTEM INTEGRITY SEPTEMBER 887 080.58100 2,743 INSTALL 2744 FEET OF 2 INCH POLY AND ABANDON 2921 FEET OF 2 INCH STEEL AND 50 FEET OF 4 INCH POLY ALONG SOUTH COLLEGE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 888 080.58101 40 INSTALL 1890 FEET OF 2 INCH POLY ALONG LAWRENCE AND ABANDON 1890 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 889 080.58103 36 INSTALL 1750 FEET OF 2 INCH AND 50 FEET OF 4 INCH POLY ALONG LAWRENCE AND ABANDON 950 FEET OF 4 INCH AND 680 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 890 080.58104 7 INSTALL 60 FEET OF 2 INCH, 906 FEET OF 4 INCH AND 1907 FEET OF 6 INCH POLY AND ABANDON 1018 FEET OF 2 INCH AND 1160 FEET OF 3 INCH STEEL AND 1025 FEET OF 3 INCH POLY ALONG PORCH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TIOGA SYSTEM INTEGRITY SEPTEMBER 891 080.58105 190 INSTALL 13999 FEET OF 4 INCH POLY ALONG LINE M6 AND ABANDON 13878 FEET OF 3 INCH STEEL AND 11 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FROST SYSTEM INTEGRITY SEPTEMBER 892 080.58107 20 INSTALL 361 FEET OF 2 INCH AND 936 FEET OF 4 INCH POLY ALONG 4TH STREET AND ABANDON 330 FEET OF 2 INCH AND 1000 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER 893 080.58109 (0) INSTALL 92 FEET OF 4 INCH POLY ALONG 11TH STREET AND ABANDON 24 FEET OF 2 INCH AND 68 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 894 080.58110 9 INSTALL 60 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION ALONG CYPRESS AND ABANDON 196 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY SEPTEMBER 895 080.58112 (4) INSTALL 26 FEET OF 8 INCH POLY ALONG SYCAMORE STREET AND ABANDON 24 FEET OF 8 INCH AND 2 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 896 080.58113 1 RELOCATE FACILITIES. INSTALL 861 FEET OF 2 INCH POLY ALONG FOCH STREET AND ABANDON 970 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 897 080.58115 11 INSTALL (50) POLY SERVICE LINES AND ABANDON (50) COPPER SERVICE LINES ALONG STREETS IN CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 898 080.58117 59 INSTALL 3375 FEET OF 2 INCH POLY ALONG DONALDSON STREET AND ABANDON 27 FEET OF 1.25 INCH, 797 FEET OF 2 INCH, 326 FEET OF 3 INCH AND 470 FEET OF 4 INCH POLY AND 1096 FEET OF 3 INCH, 550 FEET OF 4 INCH AND 363 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERENS SYSTEM INTEGRITY OCTOBER 899 080.58119 1 INSTALL 3146 FEET OF 2 INCH POLY ALONG DONALDSON STREET AND ABANDON 150 FEET OF 2 INCH, 1760 FEET OF 4 INCH, 740 FEET OF 3 INCH STEEL, 150 FEET OF 3 INCH AND 500 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERENS SYSTEM INTEGRITY SEPTEMBER 900 080.58131 3 RELOCATE FACILITIES. INSTALL 87 FEET OF 2 INCH AND 3 FEET OF 4 INCH POLY ALONG JOMAR LANE AND ABANDON 81 FEET OF 2 INCH AND 9 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES SEPTEMBER 901 080.58147 (0) RELOCATE FACILITIES. INSTALL (5) POLY SERVICE LINES AND ABANDON (5) POLY SERVICES ALONG MCGREGOR STREET TO ACCOMMODATE CITY OF MCGREGOR STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO RELOCATION OF FACILITIES SEPTEMBER 902 080.58149 13 INSTALL 1200 FEET OF 2 INCH POLY ALONG COUNTY ROAD 1020 AND ABANDON 720 FEET OF STEEL AND 480 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER 903 080.58153 39 INSTALL 1800 FEET OF 6 INCH AND 60 FEET OF 2 INCH POLY ALONG MOCKINGBIRD LANE AND ABANDON 20 FEET OF 4 INCH POLY, 85 FEET OF 2 INCH POLY, 1715 FEET OF 2 INCH STEEL AND 55 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY SEPTEMBER 904 080.58154 515 INSTALL 3600 FEET OF 2 INCH POLY AND ABANDON 3400 FEET OF 4 INCH STEEL ALONG ADELAIDE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY OCTOBER 905 080.58158 57 INSTALL 45 FEET OF 8 INCH STEEL ALONG WILLIAMS DRIVE AND ABANDON (2) 8 INCH STEEL VALVES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY SEPTEMBER 906 080.58159 135 INSTALL 2885 FEET OF 4 INCH POLY AND ABANDON 884 FEET OF 4 INCH, 997 FEET OF 6 INCH CAST IRON, 345 FEET OF 2 INCH STEEL ALONG RETTA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 907 080.58161 68 INSTALL 2226 FEET OF 2 INCH, 11 FEET OF 3 INCH, AND 66 FEET OF 4 INCH POLY AND ABANDON 151 FEET OF 3 INCH, 2458 FEET OF 4 INCH STEEL, 7 FEET OF 3 INCH AND 65 FEET OF 4 INCH POLY ALONG JAMES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY SEPTEMBER 908 080.58162 30 RELOCATE FACILITIES. INSTALL (52) POLY SERVICES ALONG SOUTHMOOR ROAD AND ABANDON (52) POLY SERVICES TO ACCOMMODATE CITY OF ARLINGTON PAVING AND DRAINAGE PLAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES SEPTEMBER 909 080.58167 60 INSTALL 1900 FEET OF 6 INCH AND 320 FEET OF 2 INCH POLY ALONG HACKBERRY AND ABANDON 411 FEET OF 2 INCH, 1595 FEET PF 8 INCH STEEL AND 997 FEET OF 2 INCH AND 30 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER 910 080.58169 2 ABANDON 57 FEET OF 24 INCH STEEL ALONG LINE CA (3RD) IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AZLE SYSTEM INTEGRITY SEPTEMBER 911 080.58172 12 RELOCATE FACILITIES. INSTALL (16) POLY SERVICES ALONG BRIAR HILL ROAD AND ABANDON (16) POLY SERVICES TO ACCOMMODATE CITY OF GRAND PRAIRIE IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES SEPTEMBER 912 080.58174 17 INSTALL 430 FEET OF 4 INCH POLY AND ABANDON 440 FEET OF 4 INCH STEEL AND 5 FEET OF 4 INCH POLY ALONG WEST PIONEER PARKWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER 913 080.58192 (0) INSTALL 3 INCH VALVE AND ABANDON 3 INCH VALVE ON DISTRICT REGULATOR STATION ALONG BEAVER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY SEPTEMBER 914 080.58195 1 RELOCATE FACILITIES. INSTALL 296 FEET OF 6 INCH POLY ALONG MCDERMOTT ROAD AND ABANDON 264 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES SEPTEMBER 915 080.58204 3 INSTALL 1401 FEET OF 2 INCH POLY ALONG AVENUE F AND ABANDON 1141 FEET OF 4 INCH STEEL AND 264 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 916 080.58212 19 INSTALL 1465 FEET OF 4 INCH POLY ALONG HILLCREST DRIVE AND ABANDON 1460 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 917 080.58217 77 INSTALL 1821 FEET OF 2 INCH POLY AND 157 FEET OF 4 INCH POLY AND 2241 FEET OF 6 INCH POLY AND ABANDON 1055 FEET OF 2 INCH STEEL AND 140 FEET OF 2 INCH POLY AND 144 FEET OF 4 INCH STEEL AND 2611 FEET OF 6 INCH STEEL ALONG PRESTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 28 of 178 247 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 918 080.58218 23 INSTALL 2105 FEET OF 2 INCH POLY ALONG MAPLE DRIVE AND ABANDON 2100 FEET OF 2 INCH STEEL ALONG LAKESIDE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 919 080.58225 49 INSTALL 264 FEET OF 2 INCH POLY AND 1590 FEET OF 4 INCH POLY AND ABANDON 45 FEET OF 2 INCH, 1574 FEET OF 3 INCH AND 225 FEET OF 6 INCH STEEL ALONG TRAVIS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 920 080.58229 1 INSTALL 427 FEET OF 2 INCH POLY ALONG MEADOW LAKE AVENUE AND ABANDON 408 FEET OF 2 INCH STEEL AND 8 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 921 080.58233 3 RELOCATE FACILITIES. INSTALL 20 FEET OF 2 INCH POLY ALONG CLIFF VIEW AND ABANDON 90 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 922 080.58234 0 INSTALL 17 FEET OF 2 INCH AND 2 FEET OF 3 INCH STEEL AND ABANDON 6 FEET OF 2 INCH AND 2 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 923 080.58242 5 INSTALL 670 FEET OF 2 INCH POLY ALONG CROCKETT STREET AND ABANDON 887 FEET OF 2 INCH AND 43 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER 924 080.58252 6 INSTALL 300 FEET OF 4 INCH POLY AND ABANDON 300 FEET OF 8 INCH, 119 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY ALONG RANDOLPH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER 925 080.58254 7 INSTALL 400 FEET OF 4 INCH POLY AND ABANDON 5 FEET OF 3 INCH POLY AND 385 FEET OF 4 INCH STEEL ALONG SCHOPMEYER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE SYSTEM INTEGRITY SEPTEMBER 926 080.58258 12 RELOCATE FACILITIES. INSTALL 263 FEET OF 2 INCH POLY ALONG CHESTNUT STREET AND ABANDON 263 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES SEPTEMBER 927 080.58265 48 INSTALL 1242 FEET OF 2 INCH AND 3508 FEET OF 4 INCH POLY ALONG OLD ORCHARD STREET AND ABANDON 1213 FEET OF 2 INCH AND 3425 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 928 080.58267 118 INSTALL 220 FEET OF 2 INCH, 2940 FEET OF 4 INCH AND 270 FEET OF 6 INCH ALONG 1ST STREET AND ABANDON 4000 FEET OF 2 INCH, 3 INCH, AND 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MOODY SYSTEM INTEGRITY SEPTEMBER 929 080.58276 60 INSTALL 1950 FEET OF 2 INCH POLY ALONG CANTEY AND ABANDON 1629 FEET OF 4 INCH CAST IRON AND 65 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 930 080.58306 35 INSTALL 1375 FEET OF 2 INCH POLY ALONG GLEN GARDEN AND ABANDON 301 FEET OF 4 INCH AND 886 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 931 080.58320 3 RELOCATE FACILITIES. INSTALL 1173 FEET OF 2 INCH AND 212 FEET OF 4 INCH POLY ALONG ANNA DRIVE AND ABANDON 944 FEET OF 3 INCH STEEL AND 364 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF ALLEN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN RELOCATION OF FACILITIES SEPTEMBER 932 080.58327 38 RELOCATE FACILITIES. INSTALL 1525 FEET OF 4 INCH POLY ALONG VINSON AND ABANDON 1525 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 933 080.58329 22 INSTALL 3 FEET OF 3 INCH POLY AND 803 FEET OF 4 INCH POLY AND ABANDON 652 FEET OF 3 INCH STEEL, 100 FEET OF 3 INCH POLY, AND 6 FEET OF 4 INCH POLY ALONG SHAWNEE TRACE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER 934 080.58330 4 INSTALL 2609 FEET OF 2 INCH AND 3210 FEET OF 4 INCH POLY ALONG MCKENZIE AVENUE AND ABANDON 2460 FEET OF 2 INCH, 2660 FEET OF 3 INCH AND 354 FEET OF 6 INCH STEEL AND 237 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER 935 080.58340 0 RELOCATE FACILITIES. INSTALL 130 FEET OF 6 INCH POLY ALONG RANDOL MILL ROAD AND ABANDON 130 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 936 080.58359 140 RELOCATE FACILITIES. INSTALL 470 FEET OF 2 INCH AND 339 FEET OF 4 INCH POLY AND ABANDON 472 FEET OF 2 INCH POLY AND 347 FEET OF 4 INCH STEEL ALONG WINDSOR TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 937 080.58361 99 INSTALL 2000 FEET OF 2 INCH AND 50 FEET OF 6 INCH POLY ALONG BOOKER AND ABANDON 221 FEET OF 4 INCH CAST IRON, 1500 FEET OF 2 INCH, AND 500 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 938 080.58372 1,649 INSTALL 1300 FEET OF 2 INCH POLY ALONG THE STREETS OF COUNTRY WAY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROWLETT GROWTH OCTOBER 939 080.58373 199 INSTALL 25 FEET OF 3 INCH, 34 FEET OF 6 INCH, 42 FEET OF 8 INCH STEEL AND 5 FEET OF 8 INCH POLY AND DISTRICT REGULATOR STATION AT RED OAKS AND ABANDON DISTRICT REGULATOR STATION AND 59 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RED OAK SYSTEM INTEGRITY OCTOBER 940 080.58384 0 RELOCATE FACILITIES. INSTALL 43 FEET OF 2 INCH AND 268 FEET OF 4 INCH AND 4417 FEET OF 6 INCH POLY ALONG FM 664 AND ABANDON 80 FEET OF 2 INCH, 208 FEET OF 4 INCH AND 4390 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF OVILLA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OVILLA RELOCATION OF FACILITIES SEPTEMBER 941 080.58387 8 INSTALL 360 FEET OF 2 INCH POLY ALONG 5TH STREET AND ABANDON 297 FEET OF 2 INCH AND 3 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER 942 080.58413 5,155 INSTALL 8638 FEET OF 2 INCH AND 2142 FEET OF 4 INCH POLY ALONG STREETS OF THE COLLINSBROOK FARMS PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH SEPTEMBER 943 080.58429 (0) INSTALL 492 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 482 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLANKET SYSTEM INTEGRITY SEPTEMBER 944 080.58444 33 INSTALL 450 FEET OF 6 INCH AND 280 FEET OF 4 INCH POLY ALONG HINTON AND ABANDON 161 FEET OF 3 INCH, 231 FEET OF 2 INCH, 196 FEET OF 2 INCH STEEL AND 219 FEET OF POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TIOGA SYSTEM INTEGRITY SEPTEMBER 945 080.58451 5,995 RELOCATE FACILITIES. INSTALL 473 FEET OF 2 INCH POLY AND 8 FEET OF 3 INCH POLY AND 3874 FEET OF 4 INCH POLY AND ABANDON 1780 FEET OF 2 INCH STEEL AND 1676 FEET OF 3 INCH STEEL ALONG LENNOX DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 946 080.58452 9 RELOCATE FACILITIES. INSTALL (22) POLY SERVICES AND ABANDON (22) STEEL SERVICES ALONG LANGLEY AVENUE TO ACCOMMODATE CITY OF EVERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN RELOCATION OF FACILITIES SEPTEMBER 947 080.58460 0 INSTALL 1667 FEET OF 2 INCH POLY AND ABANDON 1402 FEET OF 2 INCH POLY ALONG HEMPHILL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AVALON SYSTEM INTEGRITY SEPTEMBER 948 080.58462 1,134 INSTALL 1620 FEET OF 2 INCH POLY AND ABANDON 1384 FEET OF 2 INCH POLY ALONG KIRBY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AVALON SYSTEM INTEGRITY OCTOBER 949 080.58469 33 RELOCATE FACILITIES. INSTALL 35 FEET OF 4 INCH POLY ALONG 2ND STREET AND ABANDON 4021 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER MTX Additions Page 29 of 178 248 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 950 080.58480 3 INSTALL 2180 FEET OF 4 INCH POLY AND ABANDON 1480 FEET OF 2 INCH POLY ALONG ZMOLEK ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALMA SYSTEM INTEGRITY SEPTEMBER 951 080.58484 68 RELOCATE FACILITIES. INSTALL 1362 FEET OF 2 INCH AND 328 FEET OF 4 INCH POLY ALONG MCKINNEY AVENUE AND ABANDON 30 FEET OF 2 INCH STEEL AND 1136 FEET OF 2 INCH AND 328 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES SEPTEMBER 952 080.58485 29 RELOCATE FACILITIES. INSTALL (58) POLY SERVICES ALONG BIGGS TERRACE AND ABANDON (58) STEEL SERVICES TO ACCOMMODATE CITY OF ARLINGTON PAVING AND STORM DRAINAGE PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES SEPTEMBER 953 080.58490 42 RELOCATE FACILITIES. INSTALL 760 FEET OF 2 INCH POLY AND ABANDON 497 FEET OF 2 INCH STEEL AND 158 FEET OF 2 INCH POLY ALONG BUMPAS STREET TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES SEPTEMBER 954 080.58494 1 RELOCATE FACILITIES. INSTALL 227 FEET OF 4 INCH POLY ALONG DOMINIK DRIVE AND ABANDON 227 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF COLLEGE STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES SEPTEMBER 955 080.58499 20 RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH POLY ALONG CLARK ROAD AND ABANDON 287 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CEDAR HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL RELOCATION OF FACILITIES SEPTEMBER 956 080.58508 3,299 INSTALL 4230 FEET OF 2 INCH POLY ALONG STREETS OF THE STONEY CREEK PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SUNNYVALE GROWTH MARCH 957 080.58509 4 INSTALL 860 FEET OF 4 INCH POLY ALONG ROCKWOOD LANE AND ABANDON 853 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER 958 080.58514 59 RELOCATE FACILITIES. INSTALL 1832 FEET OF 4 INCH POLY ALONG UNIVERSITY AVENUE AND ABANDON 1834 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE RELOCATION OF FACILITIES SEPTEMBER 959 080.58515 2 INSTALL 10 FEET OF 8 INCH AND 20 FEET OF 4 INCH POLY ALONG GOODNIGHT LANE AND ABANDON 10 FEET OF 8 INCH AND 20 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 960 080.58544 3,299 INSTALL 1605 FEET OF 2 INCH POLY ALONG THE STREETS OF STONEY CREEK PHASE 5 SECTION 3. RESIDENTIAL SUNNYVALE GROWTH OCTOBER 961 080.58545 61 RELOCATE FACILITIES. INSTALL 1055 FEET OF 4 INCH AND 340 FEET OF 6 INCH POLY ALONG TRAIL LAKE AND ABANDON 1060 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 962 080.58551 (0) RELOCATE FACILITIES. INSTALL 31 FEET OF 4 INCH POLY ALONG CONCHO ROAD AND ABANDON 25 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 963 080.58564 0 RELOCATE FACILITIES. INSTALL 344 FEET OF 4 INCH POLY ALONG VICKERY STREET AND ABANDON 326 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 964 080.58577 78 RELOCATE FACILITIES. INSTALL 975 FEET OF 6 INCH POLY AND 600 FEET OF 10 INCH STEEL AND ABANDON 600 FEET OF 6 INCH STEEL, 375 FEET OF 6 INCH POLY AND 600 FEET OF 10 INCH STEEL ALONG MCDERMOTT DRIVE TO ACCOMMODATE CITY OF ALLEN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN RELOCATION OF FACILITIES SEPTEMBER 965 080.58583 8 INSTALL WELD-OVER SLEEVE ALONG LINE XT25 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN SYSTEM INTEGRITY SEPTEMBER 966 080.58587 1 RELOCATE FACILITIES. INSTALL 321 FEET OF 4 INCH POLY ALONG NORTHWOOD STREET AND ABANDON 321 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA RELOCATION OF FACILITIES SEPTEMBER 967 080.58590 651 RELOCATE FACILITIES. INSTALL 4089 FEET OF 16 INCH STEEL AND ABANDON 20 FEET OF 12 INCH AND 3965 FEET OF 18 INCH STEEL ALONG PIPELINE ROAD TO ACCOMMODATE CITY OF HURST STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST RELOCATION OF FACILITIES OCTOBER 968 080.58593 47 INSTALL 1930 FEET OF 2 INCH POLY AND ABANDON 1930 FEET OF 4 INCH CAST IRON ALONG LATTA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 969 080.58594 13 INSTALL 1540 FEET OF 2 INCH POLY ALONG LATTA AND ABANDON 1250 FEET OF 4 INCH AND 210 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 970 080.58598 175 INSTALL DISTRICT REGULATOR STATION, 10 FEET OF 3 INCH AND 297 FEET OF 8 INCH STEEL AND ABANDON 6321 FEET OF 3 INCH STEEL ALONG LINE L21 AT LIMMER LOOP IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HUTTO SYSTEM INTEGRITY OCTOBER 971 080.58608 3 RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH POLY ALONG TWIGHLIGHT AND ABANDON 450 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW RELOCATION OF FACILITIES SEPTEMBER 972 080.58610 7 INSTALL 548 FEET OF 2 INCH POLY ALONG YOUNG DRIVE AND ABANDON 540 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KILLEEN SYSTEM INTEGRITY SEPTEMBER 973 080.58618 35 INSTALL 1375 FEET OF 2 INCH POLY AND ABANDON 855 FEET OF 4 INCH AND 464 FEET OF 8 INCH CAST IRON ALONG HERALD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 974 080.58619 113 INSTALL 1394 FEET OF 2 INCH POLY AND ABANDON 538 FEET OF 4 INCH AND 141 FEET OF 6 INCH AND 424 FEET OF 8 INCH CAST IRON ALONG ELSIE FAYE HEGGINS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 975 080.58620 59 INSTALL 25 FEET OF 2 INCH AND 1300 FEET OF 4 INCH POLY ALONG ALONG EAST 12TH AND ABANDON 1530 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 976 080.58621 6 INSTALL 1130 FEET OF 2 INCH POLY ALONG CUMBERLAND AVENUE AND ABANDON 795 FEET OF 4 INCH AND 330 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 977 080.58622 18 INSTALL 1146 FEET OF 2 INCH POLY AND ABANDON 504 FEET OF 2 INCH POLY AND 712 FEET OF 4 INCH STEEL AND DRS20 ALONG 11TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY SEPTEMBER 978 080.58630 26 RELOCATE FACILITIES. INSTALL 310 FEET OF 6 INCH POLY MAIN AND ABANDON 300 FEET OF 6 INCH POLY ALONG THROCKMORTON ROAD TO ACCOMMODATE CITY OF MELISSA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA RELOCATION OF FACILITIES SEPTEMBER 979 080.58634 45 RELOCATE FACILITIES. INSTALL 1100 FEET OF 4 INCH POLY AND ABANDON 1040 FEET STEEL ALONG SOUTH DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 980 080.58635 25 INSTALL 578 FEET OF 2 INCH POLY ALONG NORTHWEST HIGHWAY AND ABANDON 365 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 981 080.58639 805 INSTALL 2360 FEET OF 2 INCH POLY AND ABANDON 2360 FEET OF 4 INCH STEEL ALONG CAMBRIDGE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER 982 080.58640 202 INSTALL 2174 FEET OF 4 INCH POLY AND ABANDON 1937 FEET OF 6 INCH CAST IRON ALONG NORTH PLYMOUTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER MTX Additions Page 30 of 178 249 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 983 080.58646 4 RELOCATE FACILITIES. INSTALL 603 FEET OF 4 INCH POLY AND ABANDON 586 FEET OF 3 INCH STEEL AND 1221 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF EASTLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND RELOCATION OF FACILITIES SEPTEMBER 984 080.58658 5,371 RELOCATE FACILITIES. INSTALL 1859 FEET OF 2 INCH POLY AND 1321 FEET OF 4 INCH POLY ALONG FM51 AND ABANDON 1235 FEET OF 2 INCH STEEL AND 225 FEET OF 2 INCH POLY AND 120 FEET OF 4 INCH STEEL AND 150 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF SPRINGTOWN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SPRINGTOWN RELOCATION OF FACILITIES OCTOBER 985 080.58669 4 RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH POLY AND ABANDON 113 FEET OF 2 INCH POLY ALONG BRANDYWINE STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES SEPTEMBER 986 080.58670 14 RELOCATE FACILITIES. INSTALL 130 FEET OF 6 INCH AND 20 FEET OF 4 INCH POLY AND ABANDON 110 FEET OF 6 INCH AND 15 FEET OF 3 INCH STEEL ALONG NEW YORK AVENUE TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES SEPTEMBER 987 080.58684 (0) RELOCATE FACILITIES. INSTALL 14 FEET OF 4 INCH POLY ALONG CANONGATE AND ABANDON 10 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FLOWER MOUND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND RELOCATION OF FACILITIES SEPTEMBER 988 080.58691 96 INSTALL 269 FEET OF 2 INCH AND 415 FEET OF 6 INCH POLY ALONG 1ST STREET AND ABANDON 269 FEET OF 2 INCH AND 414 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY SEPTEMBER 989 080.58692 17,231 INSTALL 25 FEET OF 2 INCH POLY AND 10 FEET OF 3 INCH POLY AND 26 FEET OF 4 INCH POLY AND 40 FEET OF 6 INCH POLY AND 4003 FEET OF 8 INCH POLY ALONG NORTHWOOD DRIVE AND ABANDON 30 FEET OF 2 INCH POLY AND 25 FEET OF 3 INCH POLY AND 15 FEET OF 4 INCH POLY AND 60 FEET OF 6 INCH STEEL AND 3970 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARBLE FALLS SYSTEM INTEGRITY OCTOBER 990 080.58693 2 INSTALL 487 FEET OF 6 INCH POLY ALONG VIRGINIA STREET AND ABANDON 425 FEET OF 6 INCH STEEL AND 25 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY SEPTEMBER 991 080.58694 4 RELOCATE FACILITIES. INSTALL 110 FEET OF 4 INCH POLY ALONG TEXAS AVENUE AND ABANDON 110 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES SEPTEMBER 992 080.58708 103 INSTALL 3061 FEET OF 4 INCH POLY AND ABANDON 920 FEET OF 4 INCH CAST IRON, 200 FEET OF 4 INCH POLY AND 1466 FEET OF 4 INCH STEEL ALONG WAITS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 993 080.58712 45 INSTALL 2010 FEET OF 2 INCH POLY AND ABANDON 981 FEET OF 4 INCH CAST IRON, 384 FEET OF 4 INCH POLY, 1825 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 994 080.58713 0 RELOCATE FACILITIES. INSTALL 50 FEET OF 2 INCH POLY AND ABANDON 50 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES SEPTEMBER 995 080.58714 3 INSTALL 469 FEET OF 4 INCH POLY AND ABANDON 462 FEET OF 4 INCH STEEL ALONG GILMER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY SEPTEMBER 996 080.58723 5 RELOCATE FACILITIES. INSTALL 125 FEET OF 2 INCH POLY ALONG SAGEWOOD STREET AND ABANDON 120 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES SEPTEMBER 997 080.58726 520 RELOCATE FACILITIES. INSTALL 60 FEET OF 6 INCH POLY AND ABANDON 60 FEET OF 6 INCH STEEL ALONG CONGRESS STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 998 080.58733 5 RELOCATE FACILITIES. INSTALL 70 FEET OF 2 INCH POLY AND (1) POLY SERVICE AND ABANDON (1) POLY SERVICE ALONG WHITNEY COURT TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 999 080.58734 105 RELOCATE FACILITIES. INSTALL 630 FEET OF 2 INCH AND 2803 FEET OF 4 INCH POLY AND ABANDON 2272 FEET OF 2 INCH AND 768 FEET OF 3 INCH STEEL ALONG ANITA AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1000 080.58735 26 INSTALL 1750 FEET OF 2 INCH POLY AND ABANDON 330 FEET OF 8 INCH CAST IRON AND 1750 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1001 080.58737 0 INSTALL 27 FEET OF 20 INCH STEEL AND ABANDON 27 FEET OF 24 INCH STEEL ALONG LINE CA (2ND)(WEST) IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SPRINGTOWN SYSTEM INTEGRITY SEPTEMBER 1002 080.58738 17 RELOCATE FACILITIES. INSTALL 410 FEET OF 4 INCH POLY ALONG PECAN STREET AND ABANDON 410 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF CELINA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA RELOCATION OF FACILITIES SEPTEMBER 1003 080.58740 7,010 INSTALL 4000 FEET OF 4 INCH AND 4100 FEET OF 2 INCH POLY ALONG STREETS OF BAYSIDE WEST PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROWLETT GROWTH JANUARY 1004 080.58748 63 INSTALL (160) POLY SERVICES AND ABANDON (160) STEEL SERVICES ALONG STREETS OF ROSEBUD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSEBUD SYSTEM INTEGRITY SEPTEMBER 1005 080.58750 81 INSTALL 3326 FEET OF 4 INCH POLY ALONG LAWNWOOD AND ABANDON 1205 FEET OF 4 INCH, 1498 FEET OF 6 INCH CAST IRON, 462 FEET OF 2 INCH, AND 560 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1006 080.58751 86 RELOCATE FACILITIES. INSTALL 61 FEET OF 2 INCH, 10 FEET OF 4 INCH AND 1099 FEET OF 6 INCH POLY AND ABANDON 62 FEET OF 2 INCH AND 977 FEET OF 4 INCH STEEL AND 15 FEET OF 2 INCH POLY ALONG US377 TO ACCOMMODATE CITY OF ROANOKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROANOKE RELOCATION OF FACILITIES OCTOBER 1007 080.58753 9,070 RELOCATE FACILITIES. INSTALL 396 FEET OF 2 INCH, 306 FEET OF 6 INCH, AND 248 FEET OF 8 INCH POLY AND ABANDON 36 FEET OF 2 INCH POLY, 240 FEET OF 2 INCH, 289 FEET OF 6 INCH AND 204 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE RELOCATION OF FACILITIES OCTOBER 1008 080.58755 60 RELOCATE FACILITIES. INSTALL 4400 FEET OF 2 INCH POLY ALONG COTTON STREET AND ABANDON 4743 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW RELOCATION OF FACILITIES SEPTEMBER 1009 080.58756 120 INSTALL 4 FEET OF 2 INCH POLY AND 4084 FEET OF 4 INCH POLY ALONG GALVEZ AND ABANDON 840 FEET OF 2 INCH AND 561 FEET OF 4 INCH POLY AND 2092 FEET OF 4 INCH AND 1072 FEET OF 6 INCH AND 167 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1010 080.58788 1,308 RELOCATE FACILITIES. INSTALL 125 OF 2 INCH POLY ALONG ARCHER AND ABANDON 440 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1011 080.58791 3,154 RELOCATE FACILITIES. INSTALL 110 FEET OF 6 INCH POLY AND ABANDON 5 FEET OF 6 INCH STEEL AND 105 FEET OF 6 INCH POLY ALONG WOODBROOK ST AND SOUTHRIDGE DR TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER MTX Additions Page 31 of 178 250 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1012 080.58792 (163) RELOCATE FACILITIES. INSTALL 75 FEET OF 2 INCH POLY AND 2400 FEET OF 4 INCH POLY AND ABANDON 25 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY AND 1825 FEET OF 4 INCH STEEL AND 585 FEET OF 4 INCH POLY ALONG CHESTNUT STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1013 080.58796 13 RELOCATE FACILITIES. INSTALL 6 POLY SERVICES AND ABANDON 6 STEEL SERVICES ALONG TIMBERIDGE STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES SEPTEMBER 1014 080.58797 89 RELOCATE FACILITIES. INSTALL 315 FEET OF 2 INCH POLY ALONG SHERATON STREET AND ABANDON 315 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1015 080.58798 21 RELOCATE FACILITIES. INSTALL 250 FEET OF 2 INCH POLY AND ABANDON 250 FEET OF 2 INCH POLY ALONG PLUM HOLLOW STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES SEPTEMBER 1016 080.58800 30,534 RELOCATE FACILITIES. INSTALL 1154 FEET OF 2 INCH POLY AND ABANDON 248 FEET OF 2 INCH STEEL AND 38 FEET OF 2 INCH POLY AND 804 FEET OF 4 INCH STEEL ALONG SOUTH AVENUE TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1017 080.58801 28 RELOCATE FACILITIES. INSTALL 748 FEET OF 2 INCH POLY AND ABANDON 746 FEET OF 2 INCH STEEL ALONG PANHANDLE STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES SEPTEMBER 1018 080.58806 497 RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH POLY AND ABANDON 74 FEET OF 2 INCH POLY ALONG HENDERSON DRIVE TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1019 080.58807 3,886 RELOCATE FACILITIES. INSTALL 11 POLY SERVICES AND ABANDON 11 STEEL SERVICES ALONG PAISLEY STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1020 080.58815 3,093 INSTALL 6354 FEET OF 2 INCH AND 4147 FEET OF 6 INCH POLY ALONG STREETS OF WOLF RANCH PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH NOVEMBER 1021 080.58816 2,062 INSTALL 792 FEET OF 2 INCH AND 372 FEET OF 4 INCH AND 1395 FEET OF 6 INCH POLY ALONG STREETS OF SADDLE CREED. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER 1022 080.58817 2,268 INSTALL 810 FEET OF 2 INCH AND 1230 FEET OF 4 INCH POLY ALONG STREETS OF SADDLE CREEK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER 1023 080.58824 22 RELOCATE FACILITIES. INSTALL 716 FEET OF 2 INCH POLY AND ABANDON 681 FEET OF 2 INCH POLY ALONG CHERRY DRIVE TO ACCOMMODATE CITY OF PRINCETON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PRINCETON RELOCATION OF FACILITIES SEPTEMBER 1024 080.58830 144 RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY AND 900 FEET OF 6 INCH STEEL AND ABANDON 700 FEET OF 2 INCH POLY AND 800 FEET OF 6 INCH STEEL ALONG 24TH ROAD TO ACCOMMODATE CITY OF EULESS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS RELOCATION OF FACILITIES SEPTEMBER 1025 080.58831 73 RELOCATE FACILITIES. INSTALL 160 FEET OF 2 INCH POLY AND ABANDON 160 FEET OF 2 INCH POLY ALONG HILL ALLEY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1026 080.58834 27,498 RELOCATE FACILITIES. INSTALL 160 FEET OF 2 INCH AND 545 FEET OF 4 INCH POLY AND ABANDON 226 FEET OF 2 INCH STEEL AND 908 FEET OF 4 INCH STEEL ALONG MAIN STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1027 080.58837 8,611 RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH AND 60 FEET OF 6 INCH POLY ALONG FORREST RIDGE DRIVE AND ABANDON 90 FEET OF 1.25 INCH, 20 FEET OF 2 INCH , AND 60 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1028 080.58849 0 RELOCATE FACILITIES. INSTALL 16 FEET OF 2 INCH, 2 FEET OF 3 INCH AND 142 FEET OF 4 INCH POLY ALONG CHURCH STREET AND ABANDON 45 FEET OF 2 INCH AND 116 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF GAINESVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE RELOCATION OF FACILITIES SEPTEMBER 1029 080.58860 15 INSTALL 298 FEET OF 4 INCH POLY AND ABANDON 264 FEET OF 8 INCH CAST IRON ALONG LOVERS LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1030 080.58863 81 RELOCATE FACILITIES. INSTALL 1873 FEET OF 2 INCH POLY ALONG ECTOR AND ABANDON 1120 FEET OF 2 INCH STEEL AND 631 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES SEPTEMBER 1031 080.58866 402 RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH AND 60 FEET OF 4 INCH POLY ALONG LAGUNA STREET AND ABANDON 120 FEET OF 2 INCH POLY AND 60 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1032 080.58867 66 RELOCATE FACILITIES. INSTALL 870 FEET OF 6 INCH POLY AND ABANDON 870 FEET OF 6 INCH STEEL ALONG ALONG CAMDEN COURT TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES SEPTEMBER 1033 080.58871 463 RELOCATE FACILITIES. INSTALL 160 FEET OF 2 INCH POLY AND 2200 FEET OF 4 INCH POLY ALONG PAISLEY AND ABANDON 365 FEET OF 2 INCH STEEL AND 450 FEET OF 2 INCH POLY AND 715 FEET OF 3 INCH STEEL AND 630 FEET OF 3 INCH POLY AND 260 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1034 080.58872 7,085 RELOCATE FACILITIES. INSTALL 233 FEET OF 2 INCH POLY AND 71 FEET OF 4 INCH POLY AND 182 FEET OF 6 INCH POLY AND ABANDON 200 FEET OF 2 INCH STEEL AND 71 FEET OF 4 INCH POLY AND 195 FEET OF 6 INCH STEEL ALONG HILLCREST STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1035 080.58878 36 INSTALL 1692 FEET OF 2 INCH AND 256 FEET OF 4 INCH POLY ALONG BALDWIN STREET AND ABANDON 2505 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1036 080.58879 153 INSTALL 387 FEET OF 8 INCH STEEL AND ABANDON 330 FEET OF 8 INCH STEEL ALONG PLANO ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY SEPTEMBER 1037 080.58880 38 INSTALL 1 FEET OF 2 INCH AND 1534 FEET OF 4 INCH POLY AND ABANDON 1555 FEET OF 4 INCH CAST IRON AND 75 FEET OF 4 INCH POLY ALONG BOWLING AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1038 080.58881 785 INSTALL 542 FEET OF 2 INCH POLY AND 1816 FEET OF 6 INCH POLY ALONG COLORADO STREET AND ABANDON 2270 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1039 080.58882 197 INSTALL 1418 FEET OF 2 INCH AND 635 FEET OF 4 INCH POLY ALONG AVALON DRIVE AND ABANDON 915 FEET OF 6 INCH AND 1350 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER MTX Additions Page 32 of 178 251 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1040 080.58883 246 INSTALL 796 FEET OF 2 INCH POLY AND 12 FEET OF 3 INCH POLY AND 1941 FEET OF 4 INCH POLY AND ABANDON 2224 FEET OF 3 INCH STEEL ALONG RIDGEWOOD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE SYSTEM INTEGRITY OCTOBER 1041 080.58888 52 INSTALL 1250 FEET OF 2 INCH POLY AND ABANDON 990 FEET OF 4 INCH CAST IRON ALONG LORNA LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1042 080.58890 143 INSTALL 448 FEET OF 2 INCH POLY AND 4498 FEET OF 4 INCH POLY AND ABANDON 68 FEET OF 2 INCH STEEL AND 3639 FEET OF 2 INCH POLY ALONG STATE HIGHWAY 34 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AVALON SYSTEM INTEGRITY OCTOBER 1043 080.58891 39 RELOCATE FACILITIES. INSTALL 760 FEET OF 2 INCH POLY ALONG FOARD STREET AND ABANDON 800 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1044 080.58895 0 INSTALL 504 FEET OF 2 INCH POLY ALONG CHERRY STREET AND ABANDON 801 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE SYSTEM INTEGRITY SEPTEMBER 1045 080.58896 2 INSTALL 45 FEET OF 12 INCH STEEL AND ABANDON 45 FEET OF 12 INCH STEEL ALONG LINE CA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1046 080.58899 34 INSTALL 2200 FEET OF 2 INCH POLY ALONG OLD BLOOMING GROVE AND ABANDON 2200 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AVALON SYSTEM INTEGRITY SEPTEMBER 1047 080.58900 58 INSTALL 2281 FEET OF 2 INCH POLY AND ABANDON 931 FEET OF 4 INCH AND 1124 FEET OF 6 INCH CAST IRON ALONG SUDBURY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1048 080.58901 29 INSTALL 869 FEET OF 2 INCH AND 342 FEET OF 4 INCH POLY AND ABANDON 935 FEET OF 8 INCH CAST IRON ALONG SAINT MORITZ IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1049 080.58903 77 INSTALL 470 FEET OF 2 INCH POLY AND 1035 FEET OF 4 INCH POLY AND ABANDON 1105 FEET OF 2 INCH POLY AND 56 FEET OF 4 INCH STEEL ALONG SISSOM STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AVALON SYSTEM INTEGRITY SEPTEMBER 1050 080.58907 332 INSTALL 1700 FEET OF 4 INCH, 1500 FEET OF 2 INCH, 800 FEET OF 4 INCH POLY ALONG WALNUT STREET AND ABANDON 4000 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE SYSTEM INTEGRITY OCTOBER 1051 080.58911 7 INSTALL REGULATOR AND ABANDON 4 INCH EMCO REGULATOR AT PARIS DISTRICT REGULATOR 16 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY SEPTEMBER 1052 080.58921 31 RELOCATE FACILITIES. INSTALL 100 FEET OF 6 INCH AND 60 FEET OF 2 INCH POLY ALONG DYSON AND ABANDON 100 FEET OF 6 INCH, 30 FEET OF 2 INCH POLY, AND 65 FEET OF 1.25 INCH STEEL TO ACCOMMODATE CITY OF DALLAS TXDOT RELOCATION PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 1053 080.58928 80 RELOCATE FACILITIES. INSTALL 2225 FEET OF 4 INCH POLY AND ABANDON 572 FEET OF 2 INCH POLY AND 335 FEET OF 4 INCH POLY AND 1540 FEET OF 4 INCH STEEL ALONG HICKORY STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1054 080.58929 5,821 RELOCATE FACILITIES. INSTALL 1285 FEET OF 4 INCH, 558 FEET OF 2 INCH, 216 FEET OF 2 INCH POLY ALONG HICKORY STREET AND ABANDON 1284 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1055 080.58942 98 INSTALL 267 FEET OF 2 INCH POLY AND 1981 FEET OF 4 INCH POLY ALONG UNIVERSITY AND ABANDON 1507 FEET OF 4 INCH AND 1797 FEET OF 6 INCH AND 2286 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1056 080.58945 56 INSTALL 162 FEET OF 2 INCH AND 906 FEET OF 4 INCH POLY ALONG RUGGED AND ABANDON 1050 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1057 080.58946 43 INSTALL 1137 FEET OF 2 INCH AND 3 FEET OF 4 INCH POLY ALONG ELMWOOD AND ABANDON 1555 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1058 080.58951 1,612 INSTALL 670 FEET OF 2 INCH AND 3398 FEET OF 4 INCH POLY AND ABANDON 2498 FEET OF 4 INCH AND 1499 FEET OF 6 INCH CAST IRON ALONG WINTON TERRACE WEST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1059 080.58952 6 INSTALL 142 FEET OF 8 INCH POLY ALONG LUNA ROAD AND ABANDON 142 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1060 080.58961 624 INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 116 FEET OF 1.25 INCH POLY AND 465 FEET OF 2 INCH POLY ALONG PIN OAK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 1061 080.58965 55 INSTALL 1080 FEET OF 2 INCH AND 540 FEET OF 4 INCH POLY ALONG LOVERS AND ABANDON 1080 FEET OF 4 INCH AND 540 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER 1062 080.58969 551 INSTALL 325 FEET OF 2 INCH POLY AND 3015 FEET OF 4 INCH POLY ALONG MEDFORD COURT AND ABANDON 2851 FEET OF 4 INCH, 2718 FEET OF 6 INCH STEEL, 768 FEET OF 6 INCH AND 222 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1063 080.58970 103 INSTALL 1318 FEET OF 2 INCH POLY ALONG ASBURY STREET AND ABANDON 10 FEET OF 2 INCH POLY AND 1300 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER 1064 080.58974 97 INSTALL (364) POLY SERVICES ALONG STREETS OF DUNCANVILLE AND ABANDON (364) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY SEPTEMBER 1065 080.58976 55 INSTALL 1975 FEET OF 2 INCH AND 1185 FEET OF 4 INCH POLY ALONG EVANS AND ABANDON 570 FEET OF 2 INCH, 346 FEET OF 3 INCH, 665 FEET OF 4 INCH STEEL, 120 FEET OF 2 INCH, 250 FEET OF 3 INCH AND 475 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY SEPTEMBER 1066 080.58978 11 INSTALL 315 FEET OF 2 INCH POLY AND ABANDON 470 FEET OF 2 INCH STEEL ALONG EAST IRVING STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY SEPTEMBER 1067 080.58980 254 INSTALL 22 FEET OF 2 INCH AND 2135 FEET OF 4 INCH POLY ALONG ASBURY STREET AND ABANDON 5 FEET OF 4 INCH AND 1500 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER 1068 080.58982 15 INSTALL 622 FEET OF 4 INCH POLY ALONG AVENUE J AND ABANDON 595 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY SEPTEMBER 1069 080.58991 1 ABANDON 297 FEET OF 3 INCH STEEL ALONG SPRUCE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST SYSTEM INTEGRITY SEPTEMBER 1070 080.58999 1,209 INSTALL 460 FEET OF 2 INCH POLY AND 4551 FEET OF 4 INCH POLY ALONG GREENE AVENUE AND ABANDON 2208 FEET OF 4 INCH STEEL, 785 FEET OF 4 INCH, 658 FEET OF 6 INCH CAST IRON AND 72 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1071 080.59003 1 INSTALL 258 FEET OF 4 INCH POLY AND ABANDON 52 FEET OF 4 INCH STEEL AND 260 FEET OF 4 INCH POLY ALONG CLAY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY SEPTEMBER 1072 080.59007 46 RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY ALONG ANITA AVENUE AND ABANDON 800 FEET OF 2 INCH AND 432 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER MTX Additions Page 33 of 178 252 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1073 080.59008 51 RELOCATE FACILITIES. INSTALL 1200 FEET OF 2 INCH POLY ALONG ANNA DRIVE AND ABANDON 100 FEET OF 2 INCH POLY, 200 FEET OF 2 INCH, AND 900 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF ALLEN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN RELOCATION OF FACILITIES SEPTEMBER 1074 080.59014 40 INSTALL 1320 FEET OF 2 INCH POLY ALONG DAY AND ABANDON 1040 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1075 080.59016 47 INSTALL 1450 FEET OF 2 INCH POLY ALONG DAY STREET AND ABANDON 1450 FEET OF 4 INCH CAST IRON ALONG DAY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1076 080.59020 6,556 INSTALL 419 FEET OF 2 INCH POLY AND 4165 FEET OF 4 INCH POLY AND ABANDON 75 FEET OF 2 INCH POLY AND 1249 FEET OF 3 INCH POLY AND 1447 FEET OF 4 INCH POLY AND 4423 FEET OF 6 INCH CAST IRON AND 305 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1077 080.59021 113 INSTALL (450) POLY SERVICES ALONG SCEYENE AND ABANDON (450) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1078 080.59031 119 INSTALL 3061 FEET OF 4 INCH POLY ALONG MINDEN STREET AND ABANDON 1131 FEET OF 4 INCH STEEL AND 767 FEET OF 6 INCH CAST IRON AND 182 FEET OF 6 INCH POLY AND 320 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1079 080.59039 2 INSTALL DISTRICT REGULATOR STATION ALONG FM 455 AND ABANDON DISTRICT REGULATOR STATION 07 IN ANNA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANNA SYSTEM INTEGRITY SEPTEMBER 1080 080.59050 21 INSTALL 1723 FEET OF 2 INCH POLY ALONG MAGNOLIA AND ABANDON 1680 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHANDLER SYSTEM INTEGRITY SEPTEMBER 1081 080.59051 249 INSTALL 2545 FEET OF 2 INCH POLY AND 555 FEET OF 4 INCH POLYAND ABANDON 2545 FEET OF 4 INCH CAST IRON, 30 FEET OF 6 INCH CAST IRON, AND 525 FEET OF 4 INCH POLY ALONG SAN BENITO WAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1082 080.59052 12 INSTALL 1010 FEET 2 INCH AND 110 FEET OF 4 INCH POLY ALONG RHONES QUARTER AND ABANDON 600 FEET OF 2 INCH AND 400 FEET OF 2 INCH AND 300 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TYLER SYSTEM INTEGRITY SEPTEMBER 1083 080.59054 9 INSTALL 336 FEET OF 2 INCH POLY ALONG MURCHISON AND ABANDON 334 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRANKSTON SYSTEM INTEGRITY SEPTEMBER 1084 080.59055 34 INSTALL 413 FEET OF 4 INCH POLY ALONG PRAIRIEVILLE STREET AND ABANDON 115 FEET OF 3 INCH STEEL AND 201 FEET OF 4 INCH STEEL AND 133 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY OCTOBER 1085 080.59060 192 INSTALL 469 FEET OF 2 INCH POLY AND 2036 FEET OF 4 INCH POLY AND ABANDON 1840 FEET OF 6 INCH CAST IRON ALONG SANTA CLARA DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1086 080.59062 46,071 RELOCATE FACILITIES. INSTALL 535 FEET OF 2 INCH POLY AND 5751 FEET OF 4 INCH POLY AND ABANDON 4105 FEET OF 2 INCH STEEL AND 937 FEET OF 4 INCH STEEL AND 4087 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW RELOCATION OF FACILITIES OCTOBER 1087 080.59064 134 INSTALL 169 FEET OF 2 INCH AND 3460 FEET OF 4 INCH POLY ALONG BIDDISON AND ABANDON 788 FEET OF 6 INCH, 475 FEET OF 4 INCH CAST IRON AND 2525 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1088 080.59068 421 INSTALL 1815 FEET OF 4 INCH POLY AND ABANDON 1690 FEET OF 6 INCH CAST IRON ALONG LOVERS LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1089 080.59069 107 INSTALL 1940 FEET OF 2 INCH POLY AND ABANDON 1590 FEET OF 4 INCH CAST IRON AND 395 FEET OF 6 INCH CAST IRON ALONG MORTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1090 080.59070 2 INSTALL 285 FEET OF 4 INCH POLY ALONG PECAN STREET AND ABANDON 110 FEET OF 2 INCH AND 128 FEET OF 3 INCH AND 47 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST SYSTEM INTEGRITY SEPTEMBER 1091 080.59074 33 INSTALL 1092 FEET OF 2 INCH AND 426 FEET OF 4 INCH POLY ALONG SAN PEDRO AND ABANDON 790 FEET OF 8 INCH AND 420 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1092 080.59075 49 INSTALL 445 FEET OF 4 INCH AND 1030 FEET OF 2 INCH POLY ALONG SAN BENITO AND ABANDON 790 FEET OF 4 INCH, 445 FEET OF 8 INCH CAST IRON AND 240 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1093 080.59078 104 INSTALL 3115 FEET OF 4 INCH POLY ALONG GREENE AND ABANDON 2104 FEET OF 4 INCH, 360 FEET OF 6 INCH STEEL, 434 FEET OF 4 INCH CAST IRON AND 195 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1094 080.59090 18 RELOCATE FACILITIES. INSTALL 560 FEET OF 4 INCH POLY ALONG BROADWAY STREET AND ABANDON 315 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF PROSPER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PROSPER RELOCATION OF FACILITIES SEPTEMBER 1095 080.59093 2 RELOCATE FACILITIES. INSTALL 20 FEET OF 4 INCH POLY ALONG PROCTOR AVENUE AND ABANDON 12 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES SEPTEMBER 1096 080.59100 9 INSTALL 485 FEET OF 2 INCH POLY ALONG SEQUOIA DRIVE AND ABANDON MAIN LINE REGULATOR 29 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TYLER SYSTEM INTEGRITY SEPTEMBER 1097 080.59117 302 RELOCATE FACILITIES. INSTALL 5 FEET OF 2 INCH POLY AND 611 FEET OF 4 INCH POLY AND 7055 FEET OF 8 INCH POLY ALONG MARTOP ROAD AND ABANDON 100 FEET OF 2 INCH POLY AND 7673 FEET OF 4 INCH POLY AND 5 FEET OF 6 INCH POLY AND 142 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF AUBREY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AUBREY RELOCATION OF FACILITIES OCTOBER 1098 080.59124 2,165 INSTALL 3921 FEET OF 2 INCH AND 1394 FEET OF 4 INCH POLY ALONG THE STREETS OF THE WESTON RIDGE SUBDIVISION PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH SEPTEMBER 1099 080.59132 112 INSTALL (169) POLY SERVICES ALONG STREETS OF FREDERICKSBURG AND ABANDON (169) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG SYSTEM INTEGRITY SEPTEMBER 1100 080.59135 10,074 INSTALL 800 FEET OF 20 INCH STEEL AND ABANDON 800 FEET OF 20 INCH ON LINE D ALONG WEBB CHAPEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1101 080.59140 2 INSTALL RELIEF VALVE AND ABANDON RELIEF VALVE AT DISTRICT REGULATOR STATION 01 IN CLYDE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLYDE SYSTEM INTEGRITY SEPTEMBER 1102 080.59142 386,164 INSTALL 4800 FEET OF 20 INCH STEEL ALONG 645 NORTH TOWN EAST BOULEVARD AND ABANDON 4780 FEET OF 20 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY OCTOBER 1103 080.59144 7 RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG SH 10 AND ABANDON 83 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF EULESS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS RELOCATION OF FACILITIES SEPTEMBER 1104 080.59153 49 INSTALL 500 FEET OF 2 INCH AND 935 FEET OF 4 INCH POLY ALONG FOREST PARK AND ABANDON 1823 FEET OF 4 INCH CAST IRON AND 131 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 34 of 178 253 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1105 080.59157 48 RELOCATE FACILITIES. INSTALL 1600 FEET OF 2 INCH POLY AND ABANDON 1600 FEET OF 2 INCH STEEL IN FORT WORTH ON CHEROKEE TRAIL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1106 080.59162 4 RELOCATE FACILITIES. INSTALL 85 FEET OF 2 INCH STEEL ALONG FM 1174 AND ABANDON 121 FEET OF .75 INCH POLY SERVICES TO ACCOMMODATE TXDOT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BERTRAM RELOCATION OF FACILITIES SEPTEMBER 1107 080.59165 322 RELOCATE FACILITIES. INSTALL 800 FEET OF 24 INCH STEEL ALOND PARKDALE BOULEVARD AND ABANDON 903 FEET OF 24 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 1108 080.59167 22 RELOCATE FACILITIES. INSTALL 40 FEET OF 2 INCH AND 690 FEET OF 4 INCH POLY ALONG CENTER AND ABANDON 71 FEET OF 2 INCH AND 653 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW RELOCATION OF FACILITIES SEPTEMBER 1109 080.59172 26 RELOCATE FACILITIES. INSTALL 905 FEET OF 2 INCH POLY AND ABANDON 1632 FEET OF 2 INCH STEEL ALONG CONRAD HILTON TO ACCOMMODATE CITY OF CISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO RELOCATION OF FACILITIES SEPTEMBER 1110 080.59173 29 INSTALL 680 FEET OF 2 INCH AND 98 FEET OF 4 INCH POLY AND ABANDON 840 FEET OF 3 INCH STEEL AND 1077 FEET OF 4 INCH POLY ALONG STREETS OF DAWSON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DAWSON SYSTEM INTEGRITY SEPTEMBER 1111 080.59175 28 RELOCATE FACILITIES. INSTALL 1637 FEET OF 2 INCH POLY AND 132 FEET OF 4 INCH POLY AND ABANDON 1380 FEET OF 2 INCH STEEL AND 1398 FEET OF 2 INCH POLY AND 140 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER 1112 080.59176 19 RELOCATE FACILITIES. INSTALL 15 FEET OF 6 INCH POLY ALONG ABRAMS ROAD AND ABANDON 6 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES SEPTEMBER 1113 080.59199 71 INSTALL (70) POLY SERVICES ALONG STREETS OF FORT WORTH AND ABANDON (70) COPPER SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1114 080.59202 87 INSTALL 3225 FEET OF 4 INCH POLY ALONG MASON AND ABANDON 1316 FEET OF 4 INCH CAST IRON, 710 FEET OF 6 INCH, 120 FEET OF 4 INCH STEEL, AND 290 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1115 080.59214 104 INSTALL 297 FEET OF 2 INCH POLY AND 1021 FEET OF 4 INCH POLY AND ABANDON 633 FEET OF 4 INCH AND 1246 FEET OF 8 INCH CAST IRON ALONG HOLMES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1116 080.59215 4 RELOCATE FACILITIES. INSTALL 139 FEET OF 4 INCH POLY ALONG CARTER STREET AND ABANDON 55 FEET OF 4 INCH STEEL AND 80 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES SEPTEMBER 1117 080.59216 712 INSTALL 1874 FEET OF 2 INCH POLY AND 1580 FEET OF 4 INCH POLY ALONG SANGER AVENUE AND ABANDON 515 FEET OF 4 INCH, 290 FEET OF 6 INCH, AND 715 FEET OF 8 INCH CAST IRON, 1280 FEET OF 4 INCH AND 10 FEET OF 8 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1118 080.59221 50 RELOCATE FACILITIES. INSTALL 760 FEET OF 4 INCH POLY ALONG WACO DRIVE AND ABANDON 766 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES SEPTEMBER 1119 080.59261 58 INSTALL 1025 FEET OF 2 INCH POLY AND 545 FEET OF 4 INCH POLY ALONG NOB HILL ROAD AND ABANDON 1025 FEET OF 4 INCH AND 545 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1120 080.59268 45 INSTALL 742 FEET OF 2 INCH POLY AND 494 FEET OF 4 INCH POLY ALONG KNOTT PLACE AND ABANDON 1267 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1121 080.59269 38 INSTALL AC MITIGATION ALONG LINE DT1 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1122 080.59272 135 INSTALL 979 FEET OF 2 INCH POLY AND 4115 FEET OF 4 INCH POLY ALONG LANCASTER STREET AND ABANDON 1931 FEET OF 4 INCH, 779 FEET OF 6 INCH STEEL, 1923 FEET OF 6 INCH, 915 FEET OF 4 INCH CAST IRON AND 546 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1123 080.59274 2 RELOCATE FACILITIES. ABANDON 38 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF TEMPLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE RELOCATION OF FACILITIES SEPTEMBER 1124 080.59277 19 INSTALL 950 FEET OF 4 INCH POLY ALONG 19TH STREET AND ABANDON 645 FEET OF 8 INCH, 76 FEET OF 6 INCH, 230 FEET OF 4 INCH, 21 FEET OF 3 INCH STEEL AND 13 FEET OF 8 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY SEPTEMBER 1125 080.59288 134 INSTALL 2435 FEET OF 2 INCH POLY AND 5387 FEET OF 6 INCH POLY AND ABANDON 6674 FEET OF 2 INCH STEEL ALONG SWANA DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TIOGA SYSTEM INTEGRITY OCTOBER 1126 080.59292 54 RELOCATE FACILITIES. INSTALL 579 FEET OF 2 INCH AND 650 FEET OF 4 INCH POLY ALONG WOODY LANE AND ABANDON 472 FEET OF 2 INCH AND 573 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL RELOCATION OF FACILITIES SEPTEMBER 1127 080.59293 136 INSTALL 4598 FEET OF 4 INCH POLY ALONG WILSON ROAD AND ABANDON 1624 FEET OF 3 INCH STEEL AND 2314 FEET OF 3 INCH POLY AND 399 FEET OF 4 INCH STEEL AND 514 FEET OF 4 INCH POLY AND 613 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1128 080.59307 30 INSTALL 13 FEET OF 2 INCH AND 280 FEET OF 4 INCH POLY AND ABANDON 228 FEET OF 2 INCH POLY AND 275 FEET OF 4 INCH STEEL ALONG NAVASOTA ALLEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GROESBECK SYSTEM INTEGRITY OCTOBER 1129 080.59309 135 INSTALL (313) POLY SERVICES AND ABANDON (313) STEEL SERVICES ALONG STREETS OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY SEPTEMBER 1130 080.59330 19,898 RELOCATE FACILITIES. INSTALL 827 FEET OF 2 INCH POLY AND 4121 FEET OF 4 INCH POLY AND ABANDON 90 FEET OF 2 INCH STEEL AND 827 FEET OF 2 INCH POLY AND 145 FEET OF 4 INCH STEEL AND 3976 FEET OF 4 INCH POLY ALONG CHATTEY ROAD TO ACCOMMODATE CITY OF DESOTO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO RELOCATION OF FACILITIES OCTOBER 1131 080.59331 3,425 RELOCATE FACILITIES. INSTALL 1385 FEET OF 6 INCH POLY AND ABANDON 1208 FEET OF 6 INCH POLY ALONG MAIN STREET TO ACCOMMODATE CITY OF DESOTO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO RELOCATION OF FACILITIES OCTOBER 1132 080.59332 (0) ABANDON 363 FEET OF 3 INCH STEEL, 176 FEET OF 3 INCH POLY AND 59 FEET OF 4 INCH POLY ALONG 3RD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 35 of 178 254 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1133 080.59335 1 RELOCATE FACILITIES. INSTALL 65 FEET OF 2 INCH POLY ALONG BASTROP STREET AND ABANDON 60 INCH OF 2 INCH STEEL TO ACCOMMODATE CITY OF MANOR STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANOR RELOCATION OF FACILITIES SEPTEMBER 1134 080.59337 23 INSTALL 790 FEET OF 2 INCH POLY ALONG LINDA LANE AND ABANDON 790 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY SEPTEMBER 1135 080.59339 122 INSTALL 945 FEET OF 2 INCH POLY ALONG INWOOD ROAD AND ABANDON 1000 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1136 080.59340 53 INSTALL 358 FEET OF 2 INCH POLY AND 1699 FEET OF 4 INCH POLY ALONG KENWELL STREET AND ABANDON 181 FEET OF 3 INCH AND 1664 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1137 080.59342 164 INSTALL 1965 FEET OF 2 INCH AND 350 FEET OF 4 INCH POLY ALONG LOMO ALTO AND ABANDON 1420 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER 1138 080.59344 103 INSTALL 667 FEET OF 2 INCH AND 911 FEET OF 4 INCH POLY ALONG THE STREETS OF SADDLE CREEK 2E. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER 1139 080.59345 373 INSTALL 1225 FEET OF 2 INCH POLY ALONG ROSEDALE AVENUE AND ABANDON 1065 FEET OF 4 INCH AND 360 FEET OF 6 INCH CAST IRON AND 210 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER 1140 080.59346 332 INSTALL 52 FEET OF 2 INCH POLY AND 1823 FEET OF 4 INCH POLY ALONG ABBOT AVENUE AND ABANDON 1200 FEET OF 4 INCH AND 325 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY OCTOBER 1141 080.59347 45 INSTALL 1023 FEET OF 2 INCH POLY ALONG GILLON AVENUE AND ABANDON 100 FEET OF 3 INCH, 900 FEET OF 4 INCH, 550 FEET OF 8 INCH CAST IRON AND 27 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY SEPTEMBER 1142 080.59348 6,001 INSTALL 2062 FEET OF 2 INCH POLY AND 546 FEET OF 4 INCH POLY AND ABANDON 770 FEET OF 4 INCH CAST IRON MAIN AND 1050 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1143 080.59350 1,348 INSTALL 4740 FEET OF 4 INCH POLY ALONG GRANDE AND ABANDON 2127 FEET OF 4 INCH CAST IRON, 1765 FEET OF 4 INCH, 402 FEET OF 3 INCH, 335 FEET OF 6 INCH STEEL, 280 FEET OF 2 INCH POLY AND 20 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1144 080.59360 7 RELOCATE FACILITIES. INSTALL 340 FEET OF 4 INCH POLY AND ABANDON 365 FEET OF 4 INCH POLY ALONG WALNUT CREEK DRIVE TO ACCOMMODATE CITY OF MANSFIELD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD RELOCATION OF FACILITIES SEPTEMBER 1145 080.59365 42 INSTALL 2618 FEET OF 2 INCH POLY ALONG HARROLD AND ABANDON 252 FEET OF 2 INCH, 970 FEET OF 4 INCH STEEL, 310 FEET OF 2 INCH POLY AND 1839 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HARROLD SYSTEM INTEGRITY SEPTEMBER 1146 080.59369 77 INSTALL 1450 FEET OF 4 INCH AND 315 FEET OF 2 INCH POLY ALONG ROSEDAL AVENUE AND ABANDON 1925 FEET OF 4 INCH AND 130 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER 1147 080.59372 69 INSTALL 1277 FEET OF 2 INCH POLY AND 1539 FEET OF 4 INCH POLY ALONG MARSHALL STREET AND ABANDON 1179 FEET OF 2 INCH STEEL AND 1557 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY SEPTEMBER 1148 080.59377 25 INSTALL 2515 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY ALONG BONHAM STREET AND ABANDON 2110 FEET OF 3 INCH, 275 FEET OF 2 INCH STEEL, AND 650 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY SEPTEMBER 1149 080.59378 65 RELOCATE FACILITIES. INSTALL 374 FEET OF 6 INCH STEEL ALONG BARRON ROAD AND ABANDON 355 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF COLLEGE STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES SEPTEMBER 1150 080.59381 27 RELOCATE FACILITIES. INSTALL 556 FEET OF 2 INCH POLY ALONG BIDDISON AND ABANDON 563 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1151 080.59387 5 INSTALL 360 FEET OF 2 INCH POLY ALONG LOMBARDY LANE AND ABANDON 51 FEET OF 1.25 INCH POLY AND 307 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1152 080.59402 48 RELOCATE FACILITIES. INSTALL 289 FEET OF 2 INCH POLY AND 690 FEET OF 4 INCH POLY AND 165 FEET OF 8 INCH POLY ALONG ABBOTT DRIVE AND ABANDON 605 FEET OF 3 INCH STEEL AND 343 FEET OF 4 INCH STEEL AND 130 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF WHITE SETTLEMENT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT RELOCATION OF FACILITIES OCTOBER 1153 080.59408 31 RELOCATE FACILITIES. INSTALL 1030 FEET OF 2 INCH POLY ALONG GEORGE STREET AND ABANDON 1025 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF WHITE SETTLEMENT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT RELOCATION OF FACILITIES SEPTEMBER 1154 080.59409 45 RELOCATE FACILITIES. INSTALL 692 FEET OF 2 INCH POLY AND ABANDON 702 FEET OF 2 INCH STEEL ALONG GLENN DRIVE TO ACCOMMODATE CITY OF WHITE SETTLEMENT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT RELOCATION OF FACILITIES SEPTEMBER 1155 080.59411 1 INSTALL 50 FEET OF 2 INCH POLY ALONG MCCRACKEN STREET AND ABANDON 673 FEET OF 3 INCH STEEL AND 8 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHICO SYSTEM INTEGRITY SEPTEMBER 1156 080.59414 52 INSTALL 30 FEET OF 3 INCH AND 1225 FEET OF 4 INCH POLY ALONG AVENUE Y AND ABANDON 209 FEET OF 2 INCH, 889 FEET OF 3 INCH STEEL AND 10 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY SEPTEMBER 1157 080.59416 83 INSTALL 444 FEET OF 2 INCH AND 3252 FEET OF 4 INCH POLY AND ABANDON 2280 FEET OF 2 INCH STEEL AND 356 FEET OF 2 INCH POLY AND 921 FEET OF 3 INCH STEEL AND 25 FEET OF 4 INCH POLY ALONG MARVIN AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY SEPTEMBER 1158 080.59427 61 INSTALL 2038 FEET OF 2 INCH POLY ALONG MAPLE AND ABANDON 2031 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 1159 080.59430 7 INSTALL (1) FLOWSIC METER AND ABANDON (1) FLOWSIC METER ALONG NORTH SERVICE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY SEPTEMBER 1160 080.59432 86 INSTALL 1350 FEET OF 4 INCH, 1050 FEET OF 6 INCH AND 150 FEET OF 2 INCH POLY ALONG RAY SIMON AND ABANDON 2151 FEET OF 4 INCH CAST IRON AND 516 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1161 080.59445 41 RELOCATE FACILITIES. INSTALL 22 FEET OF 2 INCH AND 821 FEET OF 4 INCH POLY ALONG FM1183 AND ABANDON 155 FEET OF 4 INCH AND 225 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS RELOCATION OF FACILITIES SEPTEMBER 1162 080.59454 37 INSTALL 1550 FEET OF 2 INCH POLY ALONG BRIGHAM AND ABANDON 1220 FEET OF 4 INCH AND 300 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1163 080.59463 46 INSTALL 903 FEET OF 2 INCH POLY AND 396 FEET OF 4 INCH POLY ALONG MALCOM X BOULEVARD AND ABANDON 1296 FEET OF 4 INCH AND 442 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 36 of 178 255 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1164 080.59468 67 INSTALL 2606 FEET OF 4 INCH POLY ALONG DEVITT STREET AND ABANDON 1073 FEET OF 4 INCH CAST IRON AND 180 FEET OF 4 INCH POLY AND 1603 FEET OF 6 INCH STEEL AND 658 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1165 080.59469 87 INSTALL 1700 FEET OF 2 INCH POLY ALONG HICKORY AND ABANDON 1320 FEET OF 4 INCH CAST IRON AND 480 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1166 080.59470 277 INSTALL 2230 FEET OF 2 INCH POLY AND 320 FEET OF 4 INCH POLY ALONG HICKORY STREET AND ABANDON 1375 FEET OF 4 INCH, 570 FEET OF 6 INCH CAST IRON AND 295 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1167 080.59473 0 ABANDON DISTRICT REGULATOR STATION 05 IN ARCHER COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOLLIDAY SYSTEM INTEGRITY SEPTEMBER 1168 080.59477 10 INSTALL 680 FEET OF 2 INCH POLY ALONG DAVIS AND ABANDON 680 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER 1169 080.59482 8 INSTALL 440 FEET OF 2 INCH POLY ALONG STROUD AND ABANDON 139 FEET OF 2 INCH, 2 FEET OF 3 INCH POLY AND 304 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FROST SYSTEM INTEGRITY SEPTEMBER 1170 080.59488 7 RELOCATE FACILITIES. INSTALL 285 FEET OF 2 INCH POLY ALONG DONALEE STREET AND ABANDON 290 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1171 080.59496 445 INSTALL 1350 FEET OF 4 INCH AND 625 FEET FO 6 INCH POLY ALONG MARYDALE DRIVE AND ABANDON 1400 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1172 080.59497 23 RELOCATE FACILITIES. INSTALL 165 FEET OF 2 INCH AND 460 FEET OF 4 INCH POLY ALONG BISHOP STREET AND ABANDON 221 FEET OF 3 INCH AND 411 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF CLIFTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON RELOCATION OF FACILITIES SEPTEMBER 1173 080.59530 280 INSTALL 1700 FEET OF 2 INCH POLY ALONG TODD STREET AND ABANDON 782 FEET OF 4 INCH AND 956 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1174 080.59533 (353) INSTALL 1490 FEET OF 2 INCH POLY AND ABANDON 1577 FEET OF 6 INCH AND 433 FEET OF 8 INCH CAST IRON ALONG KENILWORTH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1175 080.59534 30 INSTALL 1205 FEET OF 2 INCH POLY AND ABANDON 490 FEET OF 4 INCH AND 974 FEET OF 6 INCH AND 328 FEET OF 8 INCH CAST IRON ALONG ALTON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1176 080.59535 19 INSTALL 810 FEET OF 2 INCH POLY ALONG COLUMBIA AVENUE AND ABANDON 725 FEET OF 4 INCH AND 219 FEET OF 6 INCH AND 195 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1177 080.59539 60 RELOCATE FACILITIES. INSTALL 1450 FEET OF 4 INCH POLY AND ABANDON 1500 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1178 080.59541 65 RELOCATE FACILITIES. INSTALL 745 FEET OF 2 INCH AND 166 FEET OF 4 INCH POLY AND ABANDON 718 FEET OF 2 INCH AND 155 FEET OF 3 INCH STEEL ALONG SACHSE ROAD TO ACCOMMODATE CITY OF SACHSE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SACHSE RELOCATION OF FACILITIES SEPTEMBER 1179 080.59546 108 INSTALL 350 FEET OF 10 INCH STEEL ALONG BROOKHOLLOW DRIVE AND ABANDON 354 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 1180 080.59548 14 RELOCATE FACILITIES. INSTALL 524 FEET OF 2 INCH POLY AND ABANDON 277 FEET OF 2 INCH STEEL AND 220 FEET OF 2 INCH POLY ALONG GANTT STREET TO ACCOMMODATE CITY OF PRINCETON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PRINCETON RELOCATION OF FACILITIES SEPTEMBER 1181 080.59553 62 INSTALL 1854 FEET OF 2 INCH POLY AND ABANDON 1635 FEET OF 3 INCH STEEL ALONG LOVERS LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY OCTOBER 1182 080.59559 78 RELOCATE FACILITIES. INSTALL 6 FEET OF 2 INCH POLY AND 3093 FEET OF 4 INCH POLY ALONG TRAILWOOD DRIVE AND ABANDON 6 FEET OF 2 INCH STEEL, 2 FEET OF 2 INCH POLY, 2592 FEET OF 4 INCH STEEL AND 440 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL RELOCATION OF FACILITIES SEPTEMBER 1183 080.59580 47 RELOCATE FACILITIES. INSTALL 1677 FEET OF 4 INCH POLY ALONG COYLE STREET AND ABANDON 1572 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ROWLETT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT RELOCATION OF FACILITIES OCTOBER 1184 080.59590 36 INSTALL 575 FEET OF 2 INCH POLY AND ABANDON 1030 FEET OF 2 INCH STEEL ALONG 13TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRIDGEPORT SYSTEM INTEGRITY SEPTEMBER 1185 080.59600 56 RELOCATE FACILITIES. INSTALL 1047 FEET OF 2 INCH POLY AND 139 FEET OF 4 INCH POLY ALONG UNIVERSITY AVENUE AND ABANDON 496 FEET OF 2 INCH STEEL, 599 FEET OF 2 INCH POLY AND 155 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE RELOCATION OF FACILITIES OCTOBER 1186 080.59601 169 INSTALL 1951 FEET OF 4 INCH POLY AND ABANDON 1939 FEET OF 4 INCH STEEL ALONG ROYAL LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY OCTOBER 1187 080.59603 277 INSTALL 3358 FEET OF 4 INCH POLY ALONG HARRINGTON AND ABANDON 1335 FEET OF 4 INCH CAST IRON, 1142 FEET OF 4 INCH, 200 FEET OF 3 INCH, 100 FEET OF 6 INCH STEEL, 404 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1188 080.59606 13 INSTALL 300 FEET OF 2 INCH POLY AND ABANDON 295 FEET OF 2 INCH STEEL ALONG WEST BROADWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST SYSTEM INTEGRITY SEPTEMBER 1189 080.59611 28 INSTALL REGULATOR AND RELIEF VALVE AND ABANDON REGULATOR AND RELIEF VALVE AT DISTRICT REGULATOR STATION 17 IN SOUTHLAKE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE SYSTEM INTEGRITY SEPTEMBER 1190 080.59612 230 RELOCATE FACILITIES. INSTALL 3435 FEET OF 2 INCH POLY AND 780 FEET OF 4 INCH POLY AND 122 FEET OF 6 INCH POLY AND ABANDON 92 FEET OF 2 INCH STEEL AND 304 FEET OF 3 INCH STEEL AND 1233 FEET OF 3 INCH POLY AND 822 FEET OF 4 INCH POLY AND 237 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF MANSFIELD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD RELOCATION OF FACILITIES OCTOBER 1191 080.59620 (154) INSTALL 92 FEET OF 2 INCH POLY AND 510 FEET OF 4 INCH POLY AND 1823 FEET OF 6 INCH POLY ALONG STREETS OF TIOGA AND ABANDON 77 FEET OF 2 INCH STEEL AND 243 FEET OF 2 INCH POLY AND 692 FEET OF 3 INCH STEEL AND 208 FEET OF 3 INCH POLY AND 1267 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TIOGA SYSTEM INTEGRITY OCTOBER 1192 080.59625 326 INSTALL 187 FEET OF 2 INCH POLY AND 711 FEET OF 4 INCH POLY ALONG RETTA STREET AND ABANDON 462 FEET OF 3 INCH POLY AND 1346 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1193 080.59627 6,492 INSTALL 4975 FEET OF 4 INCH POLY ALONG DAVIS ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MELISSA GROWTH JULY 1194 080.59637 285 INSTALL 788 FEET OF 2 INCH POLY AND 1398 FEET OF 4 INCH POLY ALONG MANNETT STREET AND ABANDON 20 FEET OF 6 INCH POLY AND 1113 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER MTX Additions Page 37 of 178 256 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1195 080.59639 89 INSTALL 3300 FEET OF 4 INCH POLY ALONG STIRLING AND ABANDON 2194 FEET OF 4 INCH, 299 FEET OF 6 INCH CAST IRON AND 176 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1196 080.59640 614 INSTALL 2070 FEET OF 2 INCH POLY ALONG MANNETT STREET AND ABANDON 1310 FEET OF 4 INCH, 400 FEET OF 6 INCH AND 40 FEET OF 8 INCH CAST IRON AND 290 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1197 080.59642 8 INSTALL 601 FEET OF 2 INCH POLY ALONG LYTLE STREET AND ABANDON 820 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY SEPTEMBER 1198 080.59643 95 RELOCATE FACILITIES. INSTALL 1458 FEET OF 2 INCH POLY AND 703 FEET OF 4 INCH POLY ALONG LESLIE STREET AND ABANDON 2232 FEET OF 3 INCH STEEL AND 42 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF HAMILTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HAMILTON RELOCATION OF FACILITIES SEPTEMBER 1199 080.59644 38 RELOCATE FACILITIES. INSTALL 11 FEET OF 2 INCH AND 502 FEET OF 4 INCH POLY ALONG HIGHWAY 281 AND ABANDON 2 FEET OF 2 INCH AND 491 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF HAMILTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HAMILTON RELOCATION OF FACILITIES SEPTEMBER 1200 080.59645 12 INSTALL 275 FEET OF 4 INCH POLY ALONG HICKORY STREET AND ABANDON 275 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER 1201 080.59649 108,257 RELOCATE FACILITIES. INSTALL 1800 FEET OF 2 INCH AND 1200 FEET OF 8 INCH POLY ALONG FM 2478 AND ABANDON 1380 FEET OF 2 INCH STEEL AND 175 FEET OF 2 INCH AND 2180 FEET OF 8 INCH POLY TO ACCOMMODATE TXDOT STORM DRAINAGE IMPROVEMENTS IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES OCTOBER 1202 080.59660 (249) INSTALL 2336 FEET OF 2 INCH POLY ALONG BENNETT AVENUE AND ABANDON 2135 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1203 080.59666 68 RELOCATE FACILITIES. INSTALL 6 FEET OF 3 INCH POLY AND 1895 FEET OF 8 INCH POLY ALONG HUBBARD STREET AND ABANDON 1758 FEET OF 3 INCH STEEL AND 102 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF HEATH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEATH RELOCATION OF FACILITIES OCTOBER 1204 080.59672 8 RELOCATE FACILITIES. INSTALL 401 FEET OF 2 INCH POLY ALONG 14TH STREET AND ABANDON 393 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA RELOCATION OF FACILITIES SEPTEMBER 1205 080.59675 52 INSTALL 20 FEET OF 6 INCH AND 35 FEET OF 12 INCH POLY AND ABANDON 462 FEET OF 6 INCH AND 23 FEET OF 12 INCH AND 12 FEET OF 16 INCH STEEL ALONG RANIER ST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1206 080.59678 2,923 RELOCATE FACILITIES. INSTALL 105 FEET OF 2 INCH AND 50 FEET OF 4 INCH POLY AND ABANDON 256 FEET OF 2 INCH STEEL ALONG THOMAS STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1207 080.59679 8 INSTALL 300 FEET OF 2 INCH AND 160 FEET OF 4 INCH POLY ALONG BRECKENRIDGE ROAD AND ABANDON 300 FEET OF 2 INCH AND 160 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY SEPTEMBER 1208 080.59681 68 RELOCATE FACILITIES. INSTALL 115 FEET OF 2 INCH POLY AND 10 FEET OF 4 INCH POLY ALONG THUNDERBIRD DRIVE AND ABANDON 115 FEET OF 2 INCH POLY AND 10 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1209 080.59683 7 RELOCATE FACILITIES. INSTALL (12) POLY SERVICES AND ABANDON (12) STEEL SERVICES ALONG HETTIE STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1210 080.59688 377 INSTALL 1558 FEET OF 2 INCH AND 1769 FEET OF 4 INCH POLY ALONG NORMA STREET AND ABANDON 2000 FEET OF 4 INCH AND 1000 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1211 080.59691 20 INSTALL 535 FEET OF 4 INCH POLY ALONG OVERHILL ROAD AND ABANDON 140 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1212 080.59697 32 RELOCATE FACILITIES. INSTALL 1275 FEET OF 4 INCH POLY ALONG BEDFORD COURT AND ABANDON 1270 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF BEDFORD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEDFORD RELOCATION OF FACILITIES SEPTEMBER 1213 080.59700 35 RELOCATE FACILITIES. INSTALL (32) POLY SERVICES AND ABANDON (32) STEEL SERVICES ALONG OVERTON PARK EAST TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1214 080.59702 232 INSTALL 210 FEET OF 2 INCH POLY AND 3161 FEET OF 4 INCH POLY ALONG GOLDENROD AVENUE AND ABANDON 1910 FEET OF 4 INCH AND 840 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1215 080.59705 7 RELOCATE FACILITIES. INSTALL 406 FEET OF 4 INCH POLY ALONG MAIN STREET AND ABANDON 108 FEET OF 2 INCH POLY AND 227 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF WOLFE CITY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WOLFE CITY RELOCATION OF FACILITIES SEPTEMBER 1216 080.59713 4 INSTALL (4) REGULATORS AND ABANDON (4) REGULATORS AT INTERNATIONAL GRAIN ALONG CITY OF GREENVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY SEPTEMBER 1217 080.59724 515 INSTALL 2030 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK 2A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER 1218 080.59726 77 INSTALL 54 FEET OF 2 INCH AND 1263 FEET OF 8 INCH POLY ALONG 7TH STREET AND ABANDON 38 FEET OF 2 INCH, 1199 FEET OF 6 INCH STEEL, AND 3 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER 1219 080.59728 11 RELOCATE FACILITIES. INSTALL 346 FEET OF 6 INCH POLY AND ABANDON 332 FEET OF 6 INCH POLY ALONG SH360 TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES SEPTEMBER 1220 080.59729 69 INSTALL 15 FEET OF 2 INCH AND 1535 FEET OF 6 INCH POLY ALONG MINTCLAIR AND ABANDON 1460 FEET OF 6 INCH AND 15 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1221 080.59733 7 RELOCATE FACILITIES. INSTALL 215 FEET OF 2 INCH POLY ALONG RICE STREET AND ABANDON 200 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF BEVERLY HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEVERLY HILLS RELOCATION OF FACILITIES SEPTEMBER 1222 080.59738 40 INSTALL 36 FEET OF 2 INCH AND 2544 FEET OF 4 INCH POLY ALONG OLD BURK ROAD AND ABANDON MLR05 AND MLR22 AND 15 FEET OF 2 INCH, 50 FEET OF 3 INCH, 15 FEET OF 4 INCH, 320 FEET OF 6 INCH STEEL AND 81 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 1223 080.59741 58 INSTALL 1106 FEET OF 2 INCH AND 812 FEET OF 4 INCH POLY AND ABANDON 419 FEET OF 6 INCH AND 691 FEET OF 8 INCH CAST IRON ALONG GREENWAY BOLUVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 38 of 178 257 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1224 080.59745 309 INSTALL 800 FEET OF 2 INCH AND 1567 FEET OF 4 INCH POLY AND ABANDON 2160 FEET OF 6 INCH CAST IRON ALONG AVALON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1225 080.59746 5,945 INSTALL 2145 FEET OF 4 INCH POLY ALONG GASTON AVENUE AND ABANDON 530 FEET OF 6 INCH AND 2305 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1226 080.59747 669 INSTALL 1750 FEET OF 4 INCH POLY ALONG INWOOD ROAD AND ABANDON 1775 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1227 080.59753 84 INSTALL 271 FEET OF 2 INCH AND 1724 FEET OF 4 INCH POLY AND ABANDON 98 FEET OF 2 INCH AND 1376 FEET OF 4 INCH STEEL AND 167 FEET OF 4 INCH AND 172 FEET OF 6 INCH POLY AND 695 FEET OF 6 INCH CAST IRON ALONG ASTER AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1228 080.59775 322 INSTALL 1972 FEET OF 4 INCH POLY AND ABANDON 1318 FEET OF 4 INCH STEEL AND 812 FEET OF 6 INCH, 536 FEET OF 4 INCH POLY AND 746 FEET OF 6 INCH CAST IRON ALONG DAISY LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1229 080.59784 263 INSTALL (2) 8 INCH MOONEY REGULATORS AND ABANDON (2) 6 INCH GROVE REGULATORS ALONG GARLAND DISTRICT REGULATOR 60 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 1230 080.59818 4 RELOCATE FACILITIES. INSTALL 150 FEET OF 1.25 INCH POLY ALONG WOODBINE ROAD AND ABANDON 150 FEET OF 1.25 INCH POLY TO ACCOMMODATE CITY OF FLOWER MOUND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND RELOCATION OF FACILITIES SEPTEMBER 1231 080.59823 17 INSTALL (25) REGULATORS AND ABANDON (25) REGULATORS IN DALLAS COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1232 080.59824 45 INSTALL 1280 FEET OF 2 INCH AND 590 FEET OF 4 INCH POLY AND ABANDON 1550 FEET OF 4 INCH CAST IRON ALONG CHRISTENSEN DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1233 080.59825 56 INSTALL 1635 FEET OF 2 INCH AND 355 FEET OF 4 INCH POLY AND ABANDON 1630 FEET OF 4 INCH AND 345 FEET OF 6 INCH CAST IRON ALONG LATTA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1234 080.59827 89 INSTALL 29 FEET OF 2 INCH AND 17 FEET OF 4 INCH AND 2237 FEET OF 6 INCH AND 3 FEET OF 8 INCH POLY AND ABANDON 60 FEET OF 4 INCH AND 1130 FEET OF 8 INCH CAST IRON ALONG WINSTED IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1235 080.59830 273 INSTALL 1555 FEET OF 2 INCH POLY AND 422 FEET OF 4 INCH POLY AND 1069 FEET OF 6 INCH POLY AND ABANDON 450 FEET OF 8 INCH, 840 FEET OF 4 INCH CAST IRON AND 1000 FEET OF 4 INCH POLY ALONG DELROSE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1236 080.59836 7 INSTALL 400 FEET OF 4 INCH POLY ALONG TEXAS STREET AND ABANDON 380 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALVERT SYSTEM INTEGRITY SEPTEMBER 1237 080.59845 92 INSTALL 1251 FEET OF 2 INCH POLY AND 2143 FEET OF 4 INCH POLY AND ABANDON 1969 FEET OF 4 INCH, 1266 FEET OF 6 INCH CAST IRON, 994 FEET OF 6 INCH AND 538 FEET OF 4 INCH STEEL ALONG RIVERSIDE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1238 080.59854 66 RELOCATE FACILITIES. INSTALL 814 FEET OF 2 INCH POLY AND 1106 FEET OF 4 INCH POLY AND ABANDON 2000 FEET OF 4 INCH CAST IRON ALONG MARIGOLD AVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1239 080.59857 1 INSTALL GROUND BED ALONG LINE L8C AND ABANDON GROUND BED IN BRAZOS COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY SEPTEMBER 1240 080.59879 236 INSTALL 1833 FEET OF 2 INCH POLY AND 148 FEET OF 4 INCH POLY AND ABANDON 1070 FEET OF 8 INCH CAST IRON AND 1030 FEET OF 8 INCH POLY ALONG EAST MOCKINGBIRD ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1241 080.59881 25 RELOCATE FACILITIES. INSTALL 1290 FEET OF 2 INCH POLY ALONG ROUSE STREET AND ABANDON 980 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1242 080.59882 116 RELOCATE FACILITIES. INSTALL 720 FEET OF 2 INCH POLY AND 4 FEET OF 3 INCH POLY AND 2650 FEET OF 4 INCH POLY AND ABANDON 234 FEET OF 3 INCH POLY AND 1884 FEET OF 4 INCH POLY ALONG FREEPORT ROAD TO ACCOMMODATE CITY OF COPPELL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COPPELL RELOCATION OF FACILITIES SEPTEMBER 1243 080.59886 3,756 RELOCATE FACILITIES. INSTALL 2 FEET OF 4 INCH POLY AND 850 FEET OF 6 INCH POLY AND 1970 FEET OF 8 INCH POLY AND ABANDON 2188 FEET OF 2 INCH STEEL AND 518 FEET OF 2 INCH POLY ALONG COLLINS ROAD TO ACCOMMODATE CITY OF SUNNYVALE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SUNNYVALE RELOCATION OF FACILITIES OCTOBER 1244 080.59889 2,208 INSTALL 90,561 FEET OF 2 INCH, 27,748 FEET OF 4 INCH, 6,954 FEET OF 6 INCH AND 3 FEET OF 8 INCH POLY ALONG FONTANA, ESPANOLA, DURANGO, CORTEZ, AND LARGO STREETS AND ABANDON 27,293 FEET OF 2 INCH, 61,861 FEET OF 3 INCH, 19,081 FEET OF 4 INCH AND 15,296 FEET OF 6 INCH STEEL $$$$ IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1245 080.59893 351 RELOCATE FACILITIES. INSTALL 385 FEET OF 2 INCH POLY AND 5 FEET OF 3 INCH POLY AND 5232 FEET OF 4 INCH POLY ALONG KIMBO ROAD AND ABANDON 432 FEET OF 2 INCH STEEL AND 48 FEET OF 2 INCH POLY AND 3561 FEET OF 3 INCH STEEL AND 55 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1246 080.59894 10 RELOCATE FACILITIES. INSTALL 270 FEET OF 2 INCH POLY ALONG WILLOW STREET AND ABANDON 266 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF BURNET STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURNET RELOCATION OF FACILITIES SEPTEMBER 1247 080.59905 699 RELOCATE FACILITIES. INSTALL 184 FEET OF 2 INCH POLY AND 658 FEET OF 8 INCH POLY AND ABANDON 115 FEET OF 2 INCH POLY AND 147 FEET OF 6 INCH STEEL AND 301 FEET OF 8 INCH STEEL AND 101 FEET OF 8 INCH POLY AND 96 FEET OF 10 INCH STEEL ALONG EAGLE DRIVE TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1248 080.59907 44 INSTALL 1480 FEET OF 2 INCH POLY ALONG COLGATE AND ABANDON 1460 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY SEPTEMBER 1249 080.59909 21 RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY ALONG SUGAR CANE LANE AND ABANDON 316 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 1250 080.59912 13 RELOCATE FACILITIES. INSTALL 406 FEET OF 4 INCH POLY ALONG DUCK CREEK ROAD AND ABANDON 407 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF SANGER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER RELOCATION OF FACILITIES SEPTEMBER 1251 080.59939 (481) RELOCATE FACILITIES. INSTALL 72 FEET OF 2 INCH POLY AND 3468 FEET OF 4 INCH POLY AND ABANDON 1069 FEET OF 2 INCH STEEL AND 30 FEET OF 2 INCH POLY AND 2060 FEET OF 4 INCH STEEL AND 330 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1252 080.59943 81,427 INSTALL 30,000 FEET OF 6 INCH STEEL AND 5000 FEET OF 8 INCH POLY ALONG LINE L15 AND ABANDON 32,000 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE SYSTEM INTEGRITY OCTOBER MTX Additions Page 39 of 178 258 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1253 080.59946 141 RELOCATE FACILITIES. INSTALL 2075 FEET OF 2 INCH POLY AND 2200 FEET OF 4 INCH POLY AND ABANDON 6 FEET OF 2 INCH POLY AND 17 FEET OF 3 INCH POLY AND 3817 FEET OF 4 INCH POLY ALONG MAYHILL ROAD TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES SEPTEMBER 1254 080.59947 107 RELOCATE FACILITIES. INSTALL 2425 FEET OF 2 INCH POLY ALONG HAWTHORNE STREET , AND ABANDON 775 FEET OF 3 INCH STEEL, 1125 FEET OF 2 INCH STEEL AND 525 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF IRVING STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 1255 080.59948 104 INSTALL 2204 FEET OF 2 INCH AND 1223 FEET OF 4 INCH POLY ALONG SNOW WHITE DRIVE AND ABANDON 1490 FEET OF 2 INCH, 700 FEET OF 3 INCH AND 1213 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1256 080.59956 9 INSTALL 5 FEET OF 3 INCH POLY AND 371 FEET OF 4 INCH POLY AND ABANDON 370 FEET OF 3 INCH POLY ALONG BELT LINE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COPPELL SYSTEM INTEGRITY SEPTEMBER 1257 080.59970 15 INSTALL 380 FEET OF 4 INCH POLY ALONG 39TH AND ABANDON 380 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 1258 080.59971 598 INSTALL 4977 FEET OF 2 INCH POLY AND 1347 FEET OF 4 INCH POLY AND ABANDON 4801 FEET OF 3 INCH STEEL ALONG SHADY HILL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1259 080.59994 6 INSTALL 450 FEET OF 2 INCH POLY ALONG NORTH BRECKENRIDGE AND ABANDON 450 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY SEPTEMBER 1260 080.60006 3 RELOCATE FACILITIES. INSTALL 234 FEET OF 4 INCH POLY ALONG FM709 AND ABANDON 209 FEET OF 3 INCH AND 34 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF RETREAT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RETREAT RELOCATION OF FACILITIES SEPTEMBER 1261 080.60022 21 INSTALL 600 FEET OF 2 INCH POLY AND ABANDON 600 FEET OF 2 INCH STEEL ALONG WALDROP ALLEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1262 080.60047 193 INSTALL 3520 FEET OF 2 INCH AND 1475 FEET OF 4 INCH POLY ALONG MELISSA LANE AND ABANDON 5103 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1263 080.60048 168 INSTALL 1605 FEET OF 2 INCH POLY ALONG NORTHVIEW LANE AND ABANDON 1520 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1264 080.60050 248 INSTALL 4720 FEET OF 2 INCH AND 1420 FEET OF 4 INCH POLY ALONG PORT ROYAL DRIVE AND ABANDON 4720 FEET OF 2 INCH AND 1420 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1265 080.60063 64 INSTALL 2325 FEET OF 4 INCH POLY ALONG PARMER AND ABANDON 632 FEET OF 4 INCH AND 1938 FEET OF 2 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1266 080.60077 46 RELOCATE FACILITIES. INSTALL 1442 FEET OF 2 INCH POLY AND ABANDON 1394 FEET OF 2 INCH STEEL AND 5 FEET OF 2 INCH POLY ALONG CALIFORNIA LANE TO ACCOMMODATE CITY OF DALWORTHINGTON GARDENS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALWORTHINGTON GARDENS RELOCATION OF FACILITIES SEPTEMBER 1267 080.60079 60 RELOCATE FACILITIES. INSTALL 15 FEET OF 3 INCH AND 673 FEET OF 6 INCH AND 597 FEET OF 8 INCH POLY AND ABANDON 22 FEET OF 3 INCH AND 683 FEET OF 6 INCH AND 585 FEET OF 8 INCH STEEL AND 6 FEET OF 6 INCH AND 10 FEET OF 8 INCH POLY ALONG 36TH STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1268 080.60080 446,156 INSTALL 2 MILES OF 12 INCH STEEL ALONG MEADOW RUN. ALL CUSTOMERS MELISSA SYSTEM IMPROVEMENT MARCH 1269 080.60083 1 INSTALL RECTIFIER AND POLE AND ABANDON RECTIFIER AND POLE ALONG GILMER RD IN LONGVIEW IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY SEPTEMBER 1270 080.60087 69 INSTALL 1350 FEET OF 4 INCH POLY AND ABANDON 1350 FEET OF 3 INCH STEEL ALONG MELETIO LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1271 080.60088 8 RELOCATE FACILITIES. INSTALL 140 FEET OF 4 INCH AND 224 FEET OF 6 INCH POLY ALONG STERILITE DRIVE AND ABANDON 178 FEET OF 4 INCH AND 182 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS RELOCATION OF FACILITIES SEPTEMBER 1272 080.60091 122 INSTALL 1431 FEET OF 4 INCH POLY ALONG WEBB AVENUE AND ABANDON 170 FEET OF 2 INCH, 800 FEET OF 3 INCH STEEL AND 247 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE SYSTEM INTEGRITY OCTOBER 1273 080.60094 810 INSTALL 8428 FEET OF 2 INCH POLY AND 2 FEET OF 3 INCH POLY AND ABANDON 5502 FEET OF 2 INCH STEEL, 1761 FEET OF 2 INCH POLY, 229 FEET OF 3 INCH STEEL, 97 FEET OF 3 INCH POLY AND 350 FEET OF 4 INCH STEEL ALONG WEST 34TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 1274 080.60100 172 RELOCATE FACILITIES. INSTALL 279 FEET OF 2 INCH POLY AND 5 FEET OF 3 INCH POLY AND 2631 FEET OF 4 INCH POLY AND 1240 FEET OF 6 INCH POLY MARIE STREET AND ABANDON 651 FEET OF 2 INCH STEEL AND 68 FEET OF 2 INCH POLY AND 3821 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF SAN ANGELO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS SAN ANGELO RELOCATION OF FACILITIES SEPTEMBER 1275 080.60103 304 INSTALL 1407 FEET OF 2 INCH POLY AND 6 FEET OF 3 INCH POLY AND 1428 FEET OF 4 INCH POLY ALONG CLOUD CIRCLE AND ABANDON 958 FEET OF 2 INCH STEEL AND 1022 FEET OF 3 INCH STEEL AND 1773 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1276 080.60104 258 INSTALL 2457 FEET OF 2 INCH POLY AND ABANDON 2020 FEET OF 2 INCH AND 520 FEET OF 3 INCH STEEL ALONG CROXIA DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1277 080.60105 3,580 INSTALL 2745 FEET OF 2 INCH AND 350 FEET OF 8 INCH POLY AND ABANDON 2745 FEET OF 3 INCH STEEL AND 350 FEET OF 8 INCH STEEL ALONG FLAIR DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1278 080.60106 132 INSTALL 32 FEET OF 4 INCH POLY AND 1931 FEET OF 6 INCH POLY ALONG WALDORF AND ABANDON 17 FEET OF 4 INCH STEEL AND 1876 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1279 080.60107 102 INSTALL 1622 FEET OF 2 INCH AND 1670 FEET OF 4 INCH POLY AND ABANDON 3629 FEET OF 3 INCH STEEL ALONG WEBB CHAPEL ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1280 080.60108 204 INSTALL 8530 FEET OF 2 INCH POLY, 2480 FEET OF 4 INCH POLY, AND 2340 FEET OF 6 INCH POLY ALONG WALNUT HILL LANE. ABANDON 675 FEET OF 2 INCH STEEL, 8120 FEET OF 3 INCH STEEL, 1935 FEET OF 4 INCH STEEL, 1960 FEET OF 6 INCH STEEL, AND 355 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1281 080.60110 169 INSTALL 3449 FEET OF 2 INCH POLY AND 14 FEET OF 4 INCH POLY ALONG KILLION STREET AND ABANDON 887 FEET OF 2 INCH STEEL AND 47 FEET OF 2 INCH POLY AND 2154 FEET OF 3 INCH STEEL AND 11 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1282 080.60111 32,453 INSTALL 5910 FEET OF 2 INCH, 195 FEET OF 4 INCH, 3070 FEET OF 6 INCH POLY ALONG WELCH ROAD AND ABANDON 7760 FEET OF 3 INCH, 190 FEET OF 4 INCH STEEL, 440 FEET OF 3 INCH AND 590 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1283 080.60112 (2,405) INSTALL 5964 FEET OF 2 INCH AND 1188 FEET OF 12 INCH POLY AND ABANDON 5710 FEET OF 2 INCH AND 20 FEET OF 3 INCH STEEL ALONG MIDWAY ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER MTX Additions Page 40 of 178 259 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1284 080.60113 8,952 INSTALL 28,030 FEET OF 2 INCH, 7,805 FEET OF 4 INCH, 6,065 FEET OF 6 INCH, 170 FEET OF 8 INCH, AND 6010 FEET OF 12 INCH POLY ALONG WALNUT HILL AND ABANDON 5045 FEET OF 2 INCH, 12085 FEET OF 3 INCH, 10,310 FEET OF 4 INCH, 7,925 FEET OF 6 INCH, 495 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1285 080.60114 16,598 INSTALL 3205 FEET OF 2 INCH, 3160 FEET OF 4 INCH AND 1900 FEET OF 6 INCH POLY ALONG THE STREETS OF THE LAKES AT LEGACY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PROSPER GROWTH SEPTEMBER 1286 080.60117 82 INSTALL 450 FEET OF 2 INCH POLY AND ABANDON 345 FEET OF 4 INCH CAST IRON ALONG SUMMITT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1287 080.60125 85 INSTALL DISTRICT REGULATOR STATION ALONG HACKBERRY STREET AND ABANDON DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON SYSTEM INTEGRITY OCTOBER 1288 080.60126 266 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION 05 ALONG WEST 15TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS CLIFTON SYSTEM INTEGRITY OCTOBER 1289 080.60142 24 INSTALL 940 FEET OF 2 INCH POLY ALONG REVERE AND ABANDON 930 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY SEPTEMBER 1290 080.60143 31 INSTALL 770 FEET OF 2 INCH POLY ALONG MISTLETOE DRIVE AND ABANDON 5 FEET OF 2 INCH STEEL AND 674 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY SEPTEMBER 1291 080.60145 46,645 INSTALL DISTRICT REGULATOR STATION IN EVERMAN AND ABANDON DISTRICT REGULATOR STATION DRS2541 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN SYSTEM INTEGRITY OCTOBER 1292 080.60146 97 RELOCATE FACILITIES. INSTALL 2575 FEET OF 2 INCH POLY ALONG OSCEOLE AVENUE AND 384 FEET OF 4 INCH POLY AND ABANDON 2210 FEET OF 2 INCH STEEL AND 32 FEET OF 2 INCH POLY AND 354 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.2009. ALL CUSTOMERS WACO RELOCATION OF FACILITIES SEPTEMBER 1293 080.60150 23 RELOCATE FACILITIES. INSTALL 477 FEET OF 2 INCH POLY ALONG EVA STREET AND ABANDON 467 FEET OF 2 INCH STEEL AND 10 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1294 080.60157 24 RELOCATE FACILITIES. INSTALL 1350 FEET OF 4 INCH AND 800 FEET OF 2 INCH POLY ALONG GLENDALE STREET AND ABANDON 1350 FEET OF 4 INCH AND 700 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF KILGORE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KILGORE RELOCATION OF FACILITIES SEPTEMBER 1295 080.60158 41 INSTALL 1260 FEET OF 2 INCH AND 162 FEET OF 4 INCH POLY ALONG PINE AVENUE AND ABANDON 1088 FEET OF 2 INCH, 108 FEET OF 3 INCH STEEL, 165 FEET OF 2 INCH AND 96 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER 1296 080.60163 44 INSTALL 650 FEET OF 8 INCH POLY AND ABANDON 650 FEET OF 8 INCH STEEL POLY ALONG LOMBARDY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1297 080.60167 104 RELOCATE FACILITIES. INSTALL 3000 FEET OF 2 INCH AND 310 FEET OF 4 INCH POLY AND ABANDON 3000 FEET OF 2 INCH AND 45 FEET OF 3 INCH AND 380 FEET OF 4 INCH STEEL AND 15 FEET OF 4 INCH POLY ALONG FALCON DRIVE TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL RELOCATION OF FACILITIES OCTOBER 1298 080.60170 15 INSTALL 590 FEET OF 2 INCH POLY ALONG LYNCH STREET AND ABANDON 1170 FEET OF 2 INCH STEEL AND 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE SYSTEM INTEGRITY SEPTEMBER 1299 080.60171 58 RELOCATE FACILITIES. INSTALL 57 FEET OF 2 INCH AND 1833 FEET OF 4 INCH POLY AND ABANDON 47 FEET OF 2 INCH AND 771 FEET OF 3 INCH POLY AND 990 FEET OF 4 INCH STEEL ALONG GRADY STREET TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL RELOCATION OF FACILITIES OCTOBER 1300 080.60172 53 RELOCATE FACILITIES. INSTALL 2000 FEET OF 2 INCH POLY AND ABANDON 1400 FEET OF 2 INCH STEEL AND 550 FEET OF 2 INCH POLY ALONG TRUETT STREET TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL RELOCATION OF FACILITIES SEPTEMBER 1301 080.60173 27 RELOCATE FACILITIES. INSTALL 540 FEET OF 2 INCH AND 50 FEET OF 4 INCH POLY AND ABANDON 1064 FEET OF 2 INCH AND 80 FEET OF 4 INCH STEEL AND 1500 FEET OF 2 INCH POLY ALONG FALMOUTH DRIVE TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL RELOCATION OF FACILITIES SEPTEMBER 1302 080.60178 6 INSTALL 4 FEET OF 3 INCH AND 94 FEET OF 4 INCH POLY ALONG WOODS AND ABANDON 68 FEET OF 2 INCH, 66 FEET OF 3 INCH STEEL AND 24 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER 1303 080.60182 460 INSTALL REGULATOR AND ABANDON REGULATOR ON DISTRICT REGULATOR STATION 8 ON LINE J2 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 1304 080.60188 24 INSTALL 270 FEET OF 4 INCH AND 50 FEET OF 2 INCH POLY ALONG NORTH 38TH STREET AND ABANDON 50 FEET OF 4 INCH POLY, 204 FEET OF 4 INCH AND 43 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER 1305 080.60191 31 RELOCATE FACILITIES. INSTALL 212 FEET OF 2 INCH, 590 FEET OF 4 INCH, AND 150 FEET OF 6 INCH POLY ALONG GRANT STREET AND ABANDON 209 FEET OF 2 INCH, 266 FEET OF 4 INCH AND 145 FEET OF 6 INCH POLY AND 325 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES SEPTEMBER 1306 080.60200 493 INSTALL 884 FEET OF 2 INCH AND 113 FEET OF 4 INCH AND 219 FEET OF 6 INCH AND 4810 FEET OF 8 INCH POLY AND ABANDON 857 FEET OF 3 INCH AND 113 FEET OF 4 INCH AND 30 FEET OF 6 INCH AND 4786 FEET OF 8 INCH STEEL ALONG THE STREETS OF WALNUT HILL LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1307 080.60201 272 INSTALL 52 FEET OF 2 INCH AND 3182 FEET OF 4 INCH POLY AND ABANDON 850 FEET OF 3 INCH AND 2510 FEET OF 6 INCH STEEL ALONG LAKEMONT DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1308 080.60202 378 INSTALL 2110 FEET OF 6 INCH AND 7480 FEET OF 2 INCH POLY ALONG WEBB CHAPEL ROAD AND ABANDON 310 FEET OF 2 INCH, 3405 FEET OF 3 INCH AND 2753 FEET OF 6 INCH STEEL, 75 FEET OF 6 INCH AND 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1309 080.60204 253 INSTALL 1073 FEET OF 2 INCH AND 2830 FEET OF 8 INCH POLY AND ABANDON 975 FEET OF 2 INCH AND 1598 FEET OF 6 INCH AND 2830 FEET OF 8 INCH STEEL ALONG THE STREETS OF WEBB CHAPEL ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1310 080.60217 8 RELOCATE FACILITIES. INSTALL 257 FEET OF 6 INCH POLY AND ABANDON 245 FEET OF 6 INCH POLY ALONG MAGNOLIA RIDGE DRIVE TO ACCOMMODATE CITY OF MELISSA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA RELOCATION OF FACILITIES SEPTEMBER 1311 080.60225 50 INSTALL 120 FEET OF8 INCH POLY AND ABANDON 147 FEET OF 8 INCH STEEL ALONG SOUTH HAMPTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1312 080.60248 34 INSTALL 2 FEET OF 16 INCH STEEL AND ABANDON 2 FEET OF 16 INCH STEEL ALONG WEST DAVIS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 41 of 178 260 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1313 080.60250 74 RELOCATE FACILITIES. INSTALL 16 FEET OF 2 INCH AND 2417 FEET OF 6 INCH POLY AND ABANDON 2100 FEET OF 6 INCH POLY ALONG ASHMORE LANE TO ACCOMMODATE CITY OF NORTHLAKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTHLAKE RELOCATION OF FACILITIES OCTOBER 1314 080.60254 175 RELOCATE FACILITIES. INSTALL 3667 FEET OF 2 INCH AND 1429 FEET OF 4 INCH POLY AND ABANDON 1672 FEET OF 2 INCH, 67 FEET OF 3 INCH AND 1463 FEET OF 4 INCH STEEL AND 1711 FEET OF 2 INCH AND 40 FEET OF 4 INCH POLY ALONG BAYLOR STREET TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS RELOCATION OF FACILITIES OCTOBER 1315 080.60259 31 INSTALL 110 FEET OF 12 INCH POLY AND 100 FEET OF 6 INCH POLY AND ABANDON 80 FEET OF 6 INCH STEEL AND 6 FEET OF 12 INCH POLY AND 38 FEET OF 16 INCH STEEL ALONG CHALK HILL ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1316 080.60279 11 RELOCATE FACILITIES. INSTALL 236 FEET OF 2 INCH POLY AND 123 FEET OF 4 INCH POLY ALONG HUNTING DRIVE AND ABANDON 25 FEET OF 2 INCH STEEL AND 160 FEET OF 4 INCH STEEL AND 123 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1317 080.60285 74 RELOCATE FACILITIES. INSTALL 1950 FEET OF 4 INCH POLY AND ABANDON 328 FEET OF 2 INCH AND 1875 FEET OF 3 INCH AND 8 FEET OF 4 INCH POLY ALONG INDIAN CREEK DRIVE TO ACCOMMODATE CITY OF TROPHY CLUB STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TROPHY CLUB RELOCATION OF FACILITIES OCTOBER 1318 080.60287 76 RELOCATE FACILITIES. INSTALL 4588 FEET OF 2 INCH POLY AND ABANDON 4676 FEET OF 2 INCH STEEL ALONG GLENBROOK TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER 1319 080.60288 15 INSTALL 8 FEET OF 4 INCH AND 33 FEET OF 8 INCH POLY ALONG WESTMORELAND ROAD AND ABANDON 12 FEET OF 4 INCH AND 17 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1320 080.60294 67 INSTALL 871 FEET OF 12 INCH POLY ALONG 25TH STREET AND ABANDON 854 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 1321 080.60295 34 INSTALL 7 FEET OF 12 INCH STEEL ALONG LINE P7 AND ABANDON 9 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY SEPTEMBER 1322 080.60299 39 INSTALL 7 FEET OF 8 INCH STEEL ALONG LINE L(2ND) AND ABANDON 7 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY SEPTEMBER 1323 080.60302 2 INSTALL 3 INCH FLOWSAFE RELIEF VALVES AT DISTRICT REGULATOR STATION 12 AND ABANDON 2 INCH FISHER RELIEF VALVE IN TRAVIS COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WELLS BRANCH SYSTEM INTEGRITY SEPTEMBER 1324 080.60317 8,256 INSTALL 5008 FEET OF 4 INCH POLY ALONG STREETS OF CROSSROADS AT TERRELL. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL TERRELL GROWTH JULY 1325 080.60328 18 INSTALL 25 FEET OF 12 INCH POLY AND ABANDON 25 FEET OF 12 INCH STEEL ALONG SINGLETON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1326 080.60337 12,925 RELOCATE FACILITIES. INSTALL 1052 FEET OF 8 INCH POLY AND ABANDON 824 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE RELOCATION OF FACILITIES OCTOBER 1327 080.60345 14 INSTALL 45 FEET OF 8 INCH POLY AND ABANDON 20 FEET OF 10 INCH STEEL ALONG MCKINNEY AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1328 080.60359 (19) INSTALL 1000 FEET OF 6 INCH POLY MAIN AND ABANDON 450 FEET OF 4 INCH STEEL ALONG PRESTON STREET IN ACCORDANCE WITH RAILROAD COMMISSON OF TEXAS RULE 8.209. ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY OCTOBER 1329 080.60361 732 INSTALL 346 POLY SERVICES AND ABANDON 346 STEEL SERVICES ALONG THE STREETS OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1330 080.60364 42 INSTALL 444 FEET OF 2 INCH AND 331 FEET OF 8 INCH POLY ALONG FOREST ABENUE AND ABANDON 400 FEET OF 2 INCH AND 332 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1331 080.60379 2 INSTALL RELIEF VALVE AT DISTRICT REGULATOR STATION 14 IN GARLAND AND ABANDON RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 1332 080.60381 32 RELOCATE FACILITIES. INSTALL 1254 FEET OF 2 INCH POLY ALONG CHEROKEE TRAIL AND ABANDON 1232 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1333 080.60382 2 INSTALL RELIEF VALVE AT DISTRICT REGULATOR STATION 5 IN MESQUITE AND ABANDON RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY SEPTEMBER 1334 080.60383 3 INSTALL RELIEF VALVE AT KAUFMAN DISTRICT REGULATORS STATION 06 AND ABANDON RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN SYSTEM INTEGRITY SEPTEMBER 1335 080.60390 3,493 RELOCATE FACILITIES. INSTALL 240 FEET OF 2 INCH AND 55 FEET OF 4 INCH POLY ALONG AVENUE A AND ABANDON 504 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1336 080.60391 2,085 RELOCATE FACILITIES. INSTALL 60 FEET OF 2 INCH POLY AND 50 FEET OF 4 INCH POLY ALONG AVENUE H AND ABANDON 110 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1337 080.60396 142 RELOCATE FACILITIES. INSTALL 108 FEET OF 24 INCH STEEL ALONG SCYENE ROAD AND ABANDON 100 FEET OF 24 INCH STEEL TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE RELOCATION OF FACILITIES OCTOBER 1338 080.60397 81 INSTALL 2986 FEET OF 4 INCH POLY ALONG MARTIN LYDON AVENUE AND ABANDON 1375 FEET OF 3 INCH AND 60 FEET OF 4 INCH AND 17 FEET OF 6 INCH POLY AND 1529 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1339 080.60399 737 RELOCATE FACILITIES. INSTALL 5357 FEET OF 2 INCH AND 482 FEET OF 4 INCH POLY ALONG NAVARRO AVENUE AND ABANDON 2219 FEET OF 2 INCH, 475 FEET OF 1.25 INCH, 263 FEET OF 2 INCH STEEL, 1504 FEET OF 2 INCH, AND 457 FEET OF 1.25 INCH POLY TO ACCOMMODATE CITY OF DE LEON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DE LEON RELOCATION OF FACILITIES OCTOBER 1340 080.60402 1 RELOCATE FACILITIES. INSTALL 51 FEET OF 2 INCH POLY AND ABANDON 55 FEET OF 2 INCH STEEL ALONG 3RD STREET TO ACCOMMODATE CITY OF LAMPASAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAMPASAS RELOCATION OF FACILITIES SEPTEMBER 1341 080.60413 41 RELOCATE FACILITIES. INSTALL 712 FEET OF 6 INCH POLY AND ABANDON 720 FEET OF 6 INCH POLY ALONG MILITARY PARKWAY TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE RELOCATION OF FACILITIES SEPTEMBER 1342 080.60419 378 RELOCATE FACILITIES. INSTALL 1358 FEET OF 2 INCH POLY AND 58 FEET OF 4 INCH POLY ALONG SMOKEY MOUNTAIN DRIVE AND ABANDON 1154 FEET OF 2 INCH STEEL AND 204 FEET OF 2 INCH AND 58 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES OCTOBER MTX Additions Page 42 of 178 261 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1343 080.60430 11 RELOCATE FACILITIES. INSTALL 338 FEET OF 2 INCH POLY AND ABANDON 338 FEET OF 2 INCH POLY ALONG DAVIS BOULVARD TO ACCOMMODATE CITY OF NORTH RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTH RICHLAND HILLS RELOCATION OF FACILITIES SEPTEMBER 1344 080.60439 87 INSTALL 804 FEET OF 2 INCH POLY AND 1193 FEET OF 6 INCH POLY AND ABANDON 279 FEET OF 2 INCH POLY AND 2168 FEET OF 4 INCH CAST IRON AND 1208 FEET OF 6 INCH STEEL AND 1180 FEET OF 8 INCH CAST IRON ALONG SPRING AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1345 080.60441 70 INSTALL 1640 FEET OF 4 INCH AND 810 FEET OF 2 INCH POLY ALONG MARSHALL AND ABANDON 55 FEET OF 4 INCH POLY, 95 FEET OF 6 INCH STEEL AND 2300 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1346 080.60442 24 RELOCATE FACILITIES. INSTALL 251 FEET OF 6 INCH POLY AND ABANDON 25 FEET OF 4 INCH STEEL AND 70 FEET OF 6 INCH POLY ALONG LAFAYETTE AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1347 080.60446 618 RELOCATE FACILITIES. INSTALL 1585 FEET OF 2 INCH POLY ALONG ATON STREET AND ABANDON 615 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE RELOCATION OF FACILITIES OCTOBER 1348 080.60447 1,409,734 INSTALL 2,000 FEET OF 6 INCH, 40 FEET OF 4 INCH, AND 40 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #04 ALONG STATE HIGHWAY 114 AND ABANDON 250 FEET OF 6 INCH, 1,200 FEET OF 4 INCH POLY AND 550 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION #04. ALL CUSTOMERS SOUTHLAKE SYSTEM IMPROVEMENT DECEMBER 1349 080.60449 94 INSTALL 1526 FEET OF 2 INCH, 539 FEET OF 4 INCH AND 875 FEET OF 6 INCH POLY ALONG SPRING AVENUE AND ABANDON 305 FEET OF 2 INCH STEEL AND 26 FEET OF 6 INCH AND 4 FEET OF 2 INCH POLY AND 1898 FEET OF 4 INCH AND 745 FEET OF 6 INCH AND 632 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1350 080.60452 67 INSTALL 1560 FEET OF 2 INCH AND 774 FEET OF 4 INCH POLY ALONG FRANK STREET AND ABANDON 1022 FEET OF 4 INCH POLY AND 1005 FEET OF 4 INCH AND 273 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1351 080.60454 16 INSTALL 497 FEET OF 2 INCH POLY AND ABANDON 687 FEET OF 2 INCH STEEL AND 103 FEET OF 2 INCH POLY ALONG JONES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY SEPTEMBER 1352 080.60455 97 INSTALL 2100 FEET OF 2 INCH AND 298 FEET OF 4 INCH POLY ALONG LAGOW STREET AND ABANDON 880 FEET OF 4 INCH AND 1654 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1353 080.60473 49 INSTALL 10 INCH MAINLINE VALVE AND (2) 4 INCH STRADDLE VALVES AT DFW NORTH REMOTE PARKING AND ABANDON 10 INCH MAINLINE VALVE AND (2) 4 INCH MAINLINE VALVES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY SEPTEMBER 1354 080.60474 13 INSTALL 803 FEET OF 4 INCH POLY ALONG JUNIUS STREET AND ABANDON 698 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY SEPTEMBER 1355 080.60478 755 INSTALL 427 FEET OF 2 INCH POLY AND ABANDON 410 FEET OF 1.25 INCH STEEL ALONG NORTHWEST HIGHWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1356 080.60486 83 INSTALL 2612 FEET OF 4 INCH POLY AND ABANDON 1611 FEET OF 4 INCH, 600 FEET OF 6 INCH CAST IRON, 477 FEET OF 4 INCH STEEL AND 543 FEET OF 4 INCH POLY ALONG GROVER AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1357 080.60495 19 INSTALL 510 FEET OF 2 INCH POLY ALONG ALGERITA STREET AND ABANDON 454 FEET OF 3 INCH STEEL AND 124 FEET OF 3 INCH POLY AND 80 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY SEPTEMBER 1358 080.60497 77,145 INSTALL 1,150 FEET OF 6 INCH AND 95 FEET OF 4 INCH POLY ALONG DALLAS PARKWAY AND JOHN HICKMAN IN FRISCO. ALL CUSTOMERS FRISCO GROWTH SEPTEMBER 1359 080.60507 126 INSTALL 100 FEET OF 2 INCH POLY AND 1410 FEET OF 4 INCH POLY AND ABANDON805 FEET OF 4 INCH POLY, 422 FEET OF 4 INCH CAST IRON AND 27 FEET OF 4 INCH STEEL ALONG GORDON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1360 080.60516 32 RELOCATE FACILITIES. INSTALL 978 FEET OF 2 INCH POLY AND 1088 FEET OF 4 INCH POLY AND ABANDON 572 FEET OF 2 INCH STEEL AND 927 FEET OF 2 INCH POLY AND 342 FEET OF 4 INCH POLY ALONG OATES ROAD TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER 1361 080.60517 76 INSTALL DISTRICT REGULATOR STATION AND METER AT JAGOE-PUBLIC CO ASPHALT PLANT AND ABANDON DISTRICT REGULATOR STATION AND METER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER 1362 080.60518 21 RELOCATE FACILITIES. INSTALL 910 FEET OF 4 INCH POLY ALONG WHITLEY ROAD AND ABANDON 930 FEET OF 4 INCH STEEL AND 8 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF KELLER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER RELOCATION OF FACILITIES SEPTEMBER 1363 080.60542 5 INSTALL 3 FEET OF 2 INCH POLY AND 275 FEET OF 4 INCH POLY ALONG TRADERS ROAD AND ABANDON 15 FEET OF 2 INCH POLY AND 350 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY SEPTEMBER 1364 080.60546 1,565 RELOCATE FACILITIES. INSTALL 626 FEET OF 2 INCH POLY AND 19 FEET OF 4 INCH POLY AND ABANDON 581 FEET OF 2 INCH STEEL AND 15 FEET OF 4 INCH STEEL ALONG PECAN STREET TO ACCOMMODATE CITY OF FRISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO RELOCATION OF FACILITIES OCTOBER 1365 080.60547 2 RELOCATE FACILITIES. INSTALL 55 FEET OF 2 INCH POLY ALONG HIGHWAY 79 AND ABANDON 58 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF OAKWOOD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OAKWOOD RELOCATION OF FACILITIES SEPTEMBER 1366 080.60548 375 INSTALL 1232 FEET OF 2 INCH POLY ALONG CLINTON AND ABANDON 1277 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY OCTOBER 1367 080.60559 67 RELOCATE FACILITIES. INSTALL 2257 FEET OF 2 INCH POLY AND ABANDON 65 FEET OF 2 INCH STEEL AND 1286 FEET OF 2 INCH POLY ALONG WABASH AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1368 080.60560 34 RELOCATE FACILITIES. INSTALL 291 FEET OF 6 INCH POLY ALONG SH198 AND ABANDON 215 FEET OF 4 INCH AND 25 FEET OF 6 INCH STEEL AND 3 FEET OF 4 INCH AND 20 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF CANTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CANTON RELOCATION OF FACILITIES OCTOBER 1369 080.60561 27 RELOCATE FACILITIES. INSTALL 520 FEET OF 2 INCH POLY AND ABANDON 510 FEET OF 2 INCH STEEL AND 5 FEET OF 2 INCH POLY ALONG ELLIS AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1370 080.60572 3 RELOCATE FACILITIES. INSTALL 265 FEET OF 2 INCH POLY AND ABANDON 403 FEET OF 2 INCH STEEL ALONG ENNIS AVENUE TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS RELOCATION OF FACILITIES SEPTEMBER MTX Additions Page 43 of 178 262 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1371 080.60580 643 RELOCATE FACILITIES. INSTALL 600 FEET OF 10 INCH STEEL ALONG TXDOT FRONTAGE ROAD AND ABANDON 1100 FEET OF 10 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON TXDOT STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 1372 080.60584 123 INSTALL 551 FEET OF 2 INCH POLY AND 4 FEET OF 3 INCH POLY AND ABANDON 100 FEET OF 3 INCH STEEL AND 570 FEET OF 4 INCH STEEL AND 40 FEET OF 4 INCH POLY ALONG CHESTNUT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY OCTOBER 1373 080.60585 110 INSTALL 1920 FEET OF 4 INCH POLY AND ABANDON 1920 FEET OF 6 INCH CAST IRON ALONG THE STREETS OF CHEROKEE TRAIL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1374 080.60586 4,227 INSTALL 2040 FEET OF 4 INCH POLY AND ABANDON 1950 FEET OF 6 INCH CAST IRON ALONG BLUE BONNET ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1375 080.60596 271 INSTALL 291 POLY SERVICES AND ABANDON 291 STEEL SERVICES ALONG THE STREETS OF ARLINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 1376 080.60598 98 INSTALL (164) POLY SERVICES ALONG STREETS OF WAXAHACHIE AND ABANDON (164) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY SEPTEMBER 1377 080.60599 112 INSTALL (80) POLY SERVICES ALONG STREETS OF FREDERICKSBURG AND ABANDON (80) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG SYSTEM INTEGRITY SEPTEMBER 1378 080.60604 15 INSTALL 455 FEET OF 2 INCH POLY ALONG PURNELL ROAD AND ABANDON 284 FEET OF 2 INCH AND 140 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY SEPTEMBER 1379 080.60608 17 RELOCATE FACILITIES. INSTALL 1060 FEET OF 4 INCH POLY AND ABANDON 812 FEET OF 2 INCH AND 347 FEET OF 3 INCH STEEL AND 45 FEET OF 2 INCH POLY ALONG THE STREETS OF ROCKHILL ROAD TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES SEPTEMBER 1380 080.60611 137 RELOCATE FACILITIES. INSTALL 1240 FEET OF 4 INCH POLY ALONG PERKINS STREET AND ABANDON 537 FEET OF 2 INCH STEEL AND 1542 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1381 080.60615 4,492 RELOCATE FACILITIES. INSTALL 760 FEET OF 2 INCH AND 2100 FEET OF 4 INCH POLY ALONG GARDNER DRIVE AND ABANDON 1900 FEET OF 3 INCH STEEL TO ACCOMMODATE TXDOT HIGHWAY WIDENING PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE RELOCATION OF FACILITIES OCTOBER 1382 080.60616 41 INSTALL 910 FEET OF 6 INCH POLY ALONG 24TH STREET AND ABANDON 10 FEET OF 6 INCH STEEL AND 910 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY SEPTEMBER 1383 080.60619 36 RELOCATE FACILITIES. INSTALL 1414 FEET OF 2 INCH POLY ALONG AND ABANDON 302 FEET OF 2 INCH STEEL AND 1067 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER 1384 080.60628 141 RELOCATE FACILITIES. INSTALL 188 FEET OF 4 INCH POLY ALONG ROGSBEE DRIVE AND ABANDON 188 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES OCTOBER 1385 080.60629 9 INSTALL 875 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY ALONG COMMERCE STREET AND ABANDON 1275 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1386 080.60634 18 RELOCATE FACILITIES. INSTALL 460 FEET OF 6 INCH POLY ALONG STREETS OF GRANDPRAIRIE AND ABANDON 440 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES SEPTEMBER 1387 080.60636 30 RELOCATE FACILITIES. INSTALL 33 FEET OF 4 INCH AND 458 FEET OF 8 INCH POLY ALONG BRIAR HILL ROAD AND ABANDON 28 FEET OF 3 INCH, 6 FEET OF 4 INCH, AND 430 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES SEPTEMBER 1388 080.60644 2 INSTALL FLOWSAFE RELIEF VALVE AT DISTRICT REGULATOR STATION 2 AND ABANDON ROCKWELL RELIEF VALVE IN WILLIAMSON COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY SEPTEMBER 1389 080.60646 17 INSTALL 831 FEET OF 2 INCH POLY ALONG GARLINGTON AND ABANDON 970 FEET OF 2 INCH, 32 FEET OF 3 INCH STEEL AND 38 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE SYSTEM INTEGRITY SEPTEMBER 1390 080.60655 942 INSTALL 2723 FEET OF 2 INCH POLY AND ABANDON 2422 FEET OF 3 INCH STEEL ALONG BEAVER BROOK LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1391 080.60661 275 RELOCATE FACILITIES. INSTALL 1700 FEET OF 2 INCH AND 125 FEET OF 4 INCH POLY ALONG BRANCHVIEW DRIVE ABANDON 2570 FEET OF 2 INCH STEEL AND 320 FEET OF 2 INCH POLY AND 500 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 1392 080.60662 4,820 RELOCATE FACILITIES. INSTALL 459 FEET OF 2 INCH POLY AND 4 FEET OF 3 INCH POLY AND 1780 FEET OF 4 INCH POLY AND ABANDON 180 FEET OF 2 INCH STEEL AND 95 FEET OF 2 INCH POLY AND 28 FEET OF 3 INCH POLY AND 1050 FEET OF 4 INCH POLY ALONG E.SANFORD TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 1393 080.60663 16 RELOCATE FACILITIES. INSTALL 260 FEET OF 4 INCH POLY ALONG PACIFIC STREET AND ABANDON 260 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORNEY RELOCATION OF FACILITIES SEPTEMBER 1394 080.60664 50 INSTALL 3158 FEET OF 2 INCH POLY AND ABANDON 435 FEET OF 4 INCH POLY AND 2725 FEET OF 6 INCH CAST IRON ALONG THE STREETS OF PENELOPE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1395 080.60670 823,888 INSTALL 40 FEET OF 8 INCH STEEL AND 2459 FEET OF 8 INCH POLY AND 34 FEET OF 12 INCH STEEL AND 3918 FEET OF 16 INCH STEEL AND ABANDON 5 FEET OF 4 INCH POLY AND 2723 FEET OF 18 INCH STEEL ALONG PIPELINE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY OCTOBER 1396 080.60679 61 RELOCATE FACILITIES. INSTALL 1126 FEET OF 4 INCH POLY AND ABANDON 2885 FEET OF 4 INCH STEEL AND 20 FEET OF 6 INCH POLY ALONG THE STREETS OF BISHOP STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1397 080.60681 36 RELOCATE FACILITIES. INSTALL 840 FEET OF 2 INCH POLY ALONG GAMBRELL AND ABANDON 878 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1398 080.60683 73 RELOCATE FACILITIES. INSTALL 1385 FEET OF 4 INCH POLY AND 10 FEET OF 6 INCH POLY AND ABANDON 1002 FEET OF 4 INCH STEEL AND 90 FEET OF 4 INCH POLY ALONG THE STREETS OF ROSEDALE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1399 080.60684 37 RELOCATE FACILITIES. INSTALL 3000 FEET OF 6 INCH POLY ALONG SHAHAN PRAIRIE AND ABANDON 3000 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF LITTLE ELM STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LITTLE ELM RELOCATION OF FACILITIES OCTOBER 1400 080.60685 15 INSTALL 950 FEET OF 2 INCH POLY ALONG NORTH ONEAL STREET AND ABANDON 1110 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALDWELL SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 44 of 178 263 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1401 080.60688 40 INSTALL 1527 FEET OF 2 INCH AND 529 FEET OF 4 INCH POLY ALONG CANAL STREET AND ABANDON 1440 FEET OF 4 INCH CAST IRON AND 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1402 080.60691 18,623 RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH AND 800 FEET OF 6 INCH POLY ALONG MILLER AND ABANDON 440 FEET OF 2 INCH AND 770 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER 1403 080.60693 8,087 RELOCATE FACILITIES. INSTALL 27 FEET OF 4 INCH POLY AND 4503 FEET OF 6 INCH POLY AND ABANDON 122 FEET OF 2 INCH POLY AND 3963 FEET OF 6 INCH POLY ALONG FM2181 TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1404 080.60694 1,233 RELOCATE FACILITIES. INSTALL 2268 FEET OF 4 INCH POLY ALONG CLAIREMONT AVENUE AND ABANDON 758 FEET OF 4 INCH, 894 FEET OF 6 INCH CAST IRON AND 1145 FEET OF 4 INCH AND 64 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1405 080.60699 8 INSTALL 354 FEET OF 2 INCH POLY ALONG SOUTH MARKET STREET AND ABANDON 354 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY SEPTEMBER 1406 080.60704 72 INSTALL 233 FEET OF 2 INCH AND 2320 FEET OF 4 INCH POLY AND ABANDON 1974 FEET OF 4 INCH CAST IRON, 814 FEET OF 4 INCH AND 557 FEET OF 6 INCH POLY ALONG LIVINGSTON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1407 080.60705 51 INSTALL 1841 FEET OF 4 INCH AND 5 FEET OF 6 INCH POLY ALONG LIVINGSTON AVENUE AND ABANDON 1828 FEET OF 4 INCH CAST IRON AND 3 FEET OF 4 INCH AND 20 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1408 080.60706 880 INSTALL 2665 FEET OF 4 INCH POLY ALONG STANDIFER STREET AND ABANDON 1794 FEET OF 4 INCH STEEL, 658 FEET OF 4 INCH CAST IRON AND 640 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1409 080.60707 122 INSTALL 220 FEET OF 2 INCH AND 3 FEET OF 3 INCH AND 3463 FEET OF 4 INCH POLY AND ABANDON 224 FEET OF 2 INCH AND 1339 FEET OF 6 INCH CAST IRON AND 2712 FEET OF 4 INCH STEEL AND 384 FEET OF 4 INCH POLY ALONG 22ND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1410 080.60714 98 INSTALL 150 FEET OF 4 INCH AND 450 FEET OF 8 INCH POLY AND ABANDON 10 FEET OF 3 INCH AND 50 FEET OF 4 INCH AND 1003 FEET OF 8 INCH STEEL ALONG ROGERS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1411 080.60718 124 INSTALL 1544 FEET OF 2 INCH POLY AND ABANDON 110 FEET OF 3 INCH AND 297 FEET OF 4 INCH AND 1398 FEET OF 6 CAST IRON ALONG THE STREETS OF HARWOOD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1412 080.60719 447 INSTALL 2085 FEET OF 2 INCH AND 279 FEET OF 4 INCH POLY AND ABANDON 1550 FEET OF 4 INCH AND 647 FEET OF 6 INCH CAST IRON ALONG ROBERT L PARRISH AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1413 080.60720 123 INSTALL 1237 FEET OF 2 INCH POLY AND 271 FEET OF 4 INCH POLY AND ABANDON 1508 FEET OF 6 INCH CAST IRON ALONG WOFFORD AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1414 080.60721 101 INSTALL 1307 FEET OF 2 INCH POLY AND ABANDON 8 FEET OF 2 INCH AND 871 FEET OF 6 INCH AND 352 FEET OF 8 INCH CAST IRON ALONG ELSIE FAYE HEGGINS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1415 080.60722 127 INSTALL 1135 FEET OF 2 INCH POLY AND ABANDON 1131 FEET OF 6 INCH CAST IRON ALONG EVERGREEN HILLS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1416 080.60723 25 INSTALL 910 FEET OF 2 INCH AND 160 FEET OF 4 INCH POLY AND ABANDON 555 FEET OF 2 INCH STEEL AND 790 FEET OF 4 INCH CAST IRON ALONG COLLINS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1417 080.60724 270 INSTALL 1514 FEET OF 2 INCH AND 527 FEET OF 4 INCH POLY AND ABANDON 1951 FEET OF 6 INCH CAST IRON ALONG YORK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1418 080.60725 63 INSTALL 1519 FEET OF 2 INCH AND 449 FEET OF 4 INCH POLY AND ABANDON 173 FEET OF 3 INCH POLY AND 1320 FEET OF 4 INCH AND 272 FEET OF 8 INCH CAST IRON ALONG THE STREETS OF OAKDALE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1419 080.60727 341 INSTALL 1200 FEET OF 2 INCH AND 8 FEET OF 4 INCH POLY AND ABANDON 1194 FEET OF 8 INCH CAST IRON ALONG LATTA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1420 080.60728 297 INSTALL 2530 FEET OF 2 INCH POLY ALONG FOREST HILLS AND ABANDON 1850 FEET OF 8 INCH AND 255 FEET OF 6 INCH CAST IRON AND 180 FEET OF 8 INCH AND 245 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1421 080.60729 312 INSTALL 1248 FEET OF 2 INCH POLY AND ABANDON 630 FEET OF 6 INCH AND 910 FEET OF 8 INCH CAST IRON AND 462 FEET OF 8 INCH POLY ALONG MARBURG STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1422 080.60730 50 INSTALL 925 FEET OF 2 INCH POLY AND ABANDON 447 FEET OF 4 INCH POLY AND 1110 FEET OF 6 INCH CAST IRON ALONG STOREY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1423 080.60732 3,175 INSTALL 1250 FEET OF 2 INCH AND 420 FEET OF 4 INCH POLY ALONG WODDORD AVENUE AND ABANDON 1375 FEET OF 4 INCH AND 425 FEET OF 6 ICH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1424 080.60733 30 INSTALL 967 FEET OF 2 INCH POLY AND 670 FEET OF 4 INCH POLY AND ABANDON 596 FEET OF 6 INCH CAST IRON ALONG CARTER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1425 080.60734 141 INSTALL 672 FEET OF 2 INCH POLY AND 1279 FEET OF 4 INCH POLY AND ABANDON 69 FEET OF 3 INCH AND 2350 FEET OF 4 INCH CAST IRON AND 402 FEET OF 4 INCH POLY ALONG THE STREETS OF PARK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1426 080.60735 435 INSTALL 1994 FEET OF 2 INCH POLY ALONG COLUMBIA AVENUE AND ABANDON 1030 FEET OF 4 INCH CAST IRON AND 1030 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1427 080.60736 7,289 INSTALL 1785 FEET OF 2 INCH AND 640 FEET OF 4 INCH POLY ALONG LAGOW AND ABANDON 1655 FEET OF 4 INCH, 265 FEET OF 6 INCH CAST IRON, AND 460 FEET OF 2 INCH AND 370 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1428 080.60737 191 INSTALL 1350 FEET OF 2 INCH POLY ALONG TURNER AVENUE AND ABANDON 250 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1429 080.60738 26 INSTALL 1190 FEET OF 2 INCH POLY ALONG CHRISTENSEN DRIVE AND ABANDON 1190 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1430 080.60740 57 INSTALL 1390 FEET OF 2 INCH POLY ALONG ROLINDA DRIVE AND ABANDON 1860 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER MTX Additions Page 45 of 178 264 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1431 080.60741 56 RELOCATE FACILITIES. INSTALL 1836 FEET OF 2 INCH AND 670 FEET OF 4 INCH POLY AND ABANDON 615 FEET OF 2 INCH STEEL AND 1074 FEET OF 4 INCH STEEL AND 599 FEET OF 2 INCH POLY AND 349 FEET OF 4 INCH POLY ALONG AVENUE L TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES OCTOBER 1432 080.60743 253 INSTALL 1460 FEET OF 2 INCH POLY AND ABANDON 1280 FEET OF CAST IRON ALONG MYRTLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1433 080.60744 63 INSTALL 2396 FEET OF 2 INCH POLY AND ABANDON 50 FEET OF 4 INCH POLY AND 12 FEET OF 6 INCH POLY AND 2610 FEET OF 6 INCH CAST IRON ALONG JAMAICA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1434 080.60745 46 INSTALL 1525 FEET OF 2 INCH POLY ALONG FROEMAN STREET AND ABANDON 1365 FEET OF 4 INCH AND 90 FEET OF 8 INCH CAST IRON AND 340 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1435 080.60747 1,341 INSTALL 2040 FEET OF 4 INCH POLY ALONG AVALON AVENUE AND ABANDON 180 FEET OF 4 INCH AND 1860 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1436 080.60750 29 RELOCATE FACILITIES. INSTALL 480 FEET OF 6 INCH POLY ALONG WESTERN CENTER BOULEVARD AND ABANDON 480 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1437 080.60754 119,453 INSTALL 200 FEET OF 6 INCH POLY AND 419 FEET OF 16 INCH STEEL AND ABANDON 480 FEET OF 16 INCH STEEL ALONG BAKER BLVD AND CRITES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS SYSTEM INTEGRITY OCTOBER 1438 080.60760 25 RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH POLY AND ABANDON 730 FEET OF 2 INCH STEEL AND 70 FEET OF 2 INCH POLY ALONG LAVISTA STREET TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE RELOCATION OF FACILITIES OCTOBER 1439 080.60763 309 INSTALL 1835 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK PHASE 5. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER 1440 080.60769 49,684 RELOCATE FACILITIES. INSTALL 7132 FEET OF 2 INCH POLY AND 8 FEET OF 3 INCH POLY AND 1373 FEET OF 4 INCH POLY AND 7491 FEET OF 6 INCH POLY AND ABANDON 332 FEET OF 2 INCH POLY AND 6132 FEET OF 4 INCH STEEL AND 2612 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF TERRELL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL RELOCATION OF FACILITIES OCTOBER 1441 080.60770 4 RELOCATE FACILITIES. INSTALL 527 FEET OF 2 INCH POLY ALONG PINE STREET AND ABANDON 408 FEET OF 2 INCH AND 128 FEET OF 3 INCH STEEL AND 80 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF HILLSBORO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO RELOCATION OF FACILITIES OCTOBER 1442 080.60781 27 INSTALL 1380 FEET OF 2 INCH POLY AND ABANDON 1360 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG BARRETT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER 1443 080.60797 1,031 INSTALL 1925 FEET OF 2 INCH POLY ALONG STONEBRIDGE AND ABANDON 325 FEET OF 2 INCH, 645 FEET OF 4 INCH, 1010 FEET OF 6 INCH AND 280 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1444 080.60806 30 RELOCATE FACILITIES. INSTALL 6 FEET OF 4 INCH POLY AND 1405 FEET OF 6 INCH POLY ALONG TURBEVILLE AND ABANDON 787 FEET OF 4 INCH POLY AND 692 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF HICKORY CREEK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HICKORY CREEK RELOCATION OF FACILITIES OCTOBER 1445 080.60808 15,282 RELOCATE FACILITIES. INSTALL 860 FEET OF 2 INCH POLY AND ABANDON 686 FEET OF 2 INCH POLY ALONG COIT ROAD TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES OCTOBER 1446 080.60809 40 RELOCATE FACILITIES. INSTALL 1077 FEET OF 2 INCH POLY ALONG BINGHAM STREET AND ABANDON 1013 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF STEPHENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE RELOCATION OF FACILITIES SEPTEMBER 1447 080.60817 5 RELOCATE FACILITIES. INSTALL 46 FEET OF 6 INCH POLY ALONG LAKE FOREST AND ABANDON 54 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF WOODWAY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WOODWAY RELOCATION OF FACILITIES SEPTEMBER 1448 080.60822 45 RELOCATE FACILITIES. INSTALL 840 FEET OF 2 INCH POLY ALONG NORTH TRAIL AND ABANDON 795 FEET OF 2 INCH STEEL AND 9 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF CROWLEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY RELOCATION OF FACILITIES SEPTEMBER 1449 080.60823 170 RELOCATE FACILITIES. INSTALL 1010 FEET OF 12 INCH POLY AND ABANDON 918 FEET OF 12 INCH POLY ALONG TRINITY FALLS PARKWAY TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES OCTOBER 1450 080.60826 114 RELOCATE FACILITIES. INSTALL 2700 FEET OF 2 INCH POLY AND ABANDON 2000 FEET OF 2 INCH STEEL ALONG ARAPAHO ROAD TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES SEPTEMBER 1451 080.60844 16 RELOCATE FACILITIES. INSTALL 550 FEET OF 2 INCH POLY ALONG THANNISCH AVENUE AND ABANDON 482 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES SEPTEMBER 1452 080.60847 38 INSTALL 880 FEET OF 4 INCH POLY AND ABANDON 842 FEET OF 4 INCH STEEL AND 32 FEET OF 4 INCH POLY ALONG BAILEY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER 1453 080.60852 41 INSTALL 487 FEET OF 4 INCH POLY AND ABANDON 476 FEET OF 6 INCH STEEL ALONG BILL OWENS PARKWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER 1454 080.60857 70 RELOCATE FACILITIES. INSTALL 1135 FEET OF 4 INCH POLY AND ABANDON 22 FEET OF 2 INCH STEEL AND 63 FEET OF 2 INCH POLY AND 108 FEET OF 3 INCH STEEL AND 1068 FEET OF 4 INCH STEEL AND 315 FEET OF 4 INCH POLY ALONG HANDLEY DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1455 080.60859 46 RELOCATE FACILITIES. INSTALL 1030 FEET OF 8 INCH POLY AND ABANDON 1148 FEET OF 4 INCH STEEL ALONG GRAYSON STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1456 080.60865 49 RELOCATE FACILITIES. INSTALL 1052 FEET OF 2 INCH POLY AND ABANDON 278 FEET OF 2 INCH STEEL AND 685 FEET OF 2 INCH POLY ALONG ROGERS AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1457 080.60866 29 RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH AND 1748 FEET OF 4 INCH POLY ALONG FRANCIS STREET AND ABANDON 253 FEET OF 2 INCH STEEL AND 1465 FEET OF 4 INCH STEEL AND 362 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF COLLEGE STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES SEPTEMBER MTX Additions Page 46 of 178 265 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1458 080.60868 119 RELOCATE FACILITIES. INSTALL 549 FEET OF 2 INCH POLY AND 1743 FEET OF 4 INCH POLY AND ABANDON 549 FEET OF 2 INCH STEEL AND 12 FEET OF 2 INCH POLY ALONG ANDREW AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1459 080.60871 105 INSTALL 1055 FEET OF 2 INCH POLY AND 75 FEET OF 4 INCH POLY AND 1525 FEET OF 6 INCH POLY AND ABANDON 220 FEET OF 2 INCH STEEL AND 130 FEET OF 2 INCH POLY AND 126 FEET OF 3 INCH STEEL AND 384 FEET OF 4 INCH STEEL AND 1017 FEET OF 6 INCH STEEL AND 788 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER 1460 080.60872 38 RELOCATE FACILITIES. INSTALL 251 FEET OF 2 INCH AND 693 FEET OF 4 INCH POLY ALONG KINSALE COURT AND ABANDON 212 FEET OF 2 INCH AND 480 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1461 080.60878 2,088 INSTALL 1500 FEET OF 4 INCH AND 390 FEET OF 2 INCH POLY ALONG PARKLAND AVENUE AND ABANDON 1500 FEET OF 4 INCH AND 390 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1462 080.60879 3 INSTALL DISTRICT REGULATOR STATION ALONG INTERSTATE 35 AND ABANDON DISTRICT REGULATOR STATION IN ELLIS COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY SEPTEMBER 1463 080.60886 488,225 INSTALL 2,500 FEET OF 8 INCH, 200 FEET OF 4 INCH POLY ALONG FM 157 NORTH OF NORTHEAST GREEN OAKS IN ARLINGTON. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ARLINGTON GROWTH DECEMBER 1464 080.60894 33 RELOCATE FACILITIES. INSTALL 849 FEET OF 2 INCH POLY AND ABANDON 1030 FEET OF 2 INCH STEEL ALONG MILL CREEK TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 1465 080.60897 363 RELOCATE FACILITIES. INSTALL 3280 FEET OF 4 INCH AND 600 FEET OF 6 INCH POLY ALONG CHURCH STREET AND ABANDON 2635 FEET OF 2 INCH, 405 FEET OF 2 INCH, AND 575 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF PARIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS RELOCATION OF FACILITIES OCTOBER 1466 080.60898 168,475 INSTALL 4,000 FEET OF 2 INCH AND 320 FEET OF 4 INCH POLY ALONG NORTHEAST GREEN OAKS IN ARLINGTON. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARLINGTON GROWTH DECEMBER 1467 080.60899 128 INSTALL 1082 FEET OF 10 INCH STEEL ALONG LINE M AND ABANDON 1074 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BARDWELL SYSTEM INTEGRITY OCTOBER 1468 080.60911 26 RELOCATE FACILITIES. INSTALL 210 FEET OF 2 INCH POLY ALONG HERNDON STREET AND ABANDON 199 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES OCTOBER 1469 080.60914 45 INSTALL 8 FEET OF 8 INCH POLY AND 504 FEET OF 12 INCH POLY AND ABANDON 272 FEET OF 2 INCH POLY AND 33 FEET OF 8 INCH POLY AND 623 FEET OF 12 INCH STEEL ALONG JAMES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 1470 080.60917 8,085 INSTALL AC MITIGATION ALONG LINE D17-4 IN COLLIN COUNTY. ALL CUSTOMERS PLANO SYSTEM INTEGRITY OCTOBER 1471 080.60922 181 RELOCATE FACILITIES. INSTALL 1430 FEET OF 2 INCH POLY AND 360 FEET OF 4 INCH POLY AND ABANDON 1370 FEET OF 2 INCH STEEL AND 400 FEET OF 4 INCH STEEL AND 60 FEET OF 6 INCH POLY ALONG TRENCHARD TO ACCOMMODATE CITY OF DECATUR STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR RELOCATION OF FACILITIES OCTOBER 1472 080.60930 111 INSTALL 1585 FEET OF 2 INCH POLY ALONG NORTHVIEW LANE AND ABANDON 1565 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1473 080.60931 12 RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH POLY AND 94 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 2 INCH STEEL AND 88 FEET OF 4 INCH STEEL ALONG DAVIS TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT CITY ARLINGTON OF STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 1474 080.60933 53 INSTALL 1493 FEET OF 2 INCH POLY AND ABANDON 52 FEET OF 3 INCH POLY AND 1442 FEET OF 4 INCH STEEL ALONG VANCOUVER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1475 080.60934 48 INSTALL 2351 FEET OF 2 INCH POLY ALONG CREST COVE AND ABANDON 2365 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1476 080.60942 63 RELOCATE FACILITIES. INSTALL 652 FEET OF 4 INCH POLY ALONG PARKER HENDERSON ROAD AND ABANDON 169 FEET OF 2 INCH AND 7 FEET OF 3 INCH AND 566 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1477 080.60943 6,660,151 AREA REPLACEMENT IN NORTHWEST DALLAS WITHIN THE BOUNDARIES OF DENTON DRIVE, I635, INWOOD AND NORTHWEST HIGHWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1478 080.60944 89,945 AREA REPLACEMENT IN SOUTHWEST DALLAS WITHIN THE BOUNDARIES OF TRINITY RIVER, I35E, WRIGHT AVENUE, AND LOOP 12 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1479 080.60946 10,953 FUNCTIONAL COCKRELL HILL ZONE 3 AREA REPLACEMENT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1480 080.60960 26 RELOCATE FACILITIES. INSTALL 1577 FEET OF 2 INCH POLY AND ABANDON 1260 FEET OF 2 INCH STEEL ALONG NURSERY ROAD TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES SEPTEMBER 1481 080.60967 53 RELOCATE FACILITIES. INSTALL 371 FEET OF 2 INCH AND 562 FEET OF 4 INCH POLY ALONG GOSHEN STREET AND ABANDON 404 FEET OF 2 INCH AND 464 FEET OF 3 INCH STEEL AND 84 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF CANTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CANTON RELOCATION OF FACILITIES OCTOBER 1482 080.61000 279 RELOCATE FACILITIES. INSTALL 1840 FEET OF 4 INCH POLY AND ABANDON 188 FEET OF 4 INCH POLY AND 1740 FEET OF 4 INCH STEEL ALONG NORTH STREET TO ACCOMMODATE CITY OF MANSFIELD STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD RELOCATION OF FACILITIES OCTOBER 1483 080.61007 35 INSTALL 1379 FEET OF 2 INCH POLY AND ABANDON 1900 FEET OF 2 INCH POLY ALONG SHARON LEE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 1484 080.61042 13 ABANDON DRS12 AND 81 FEET OF 3 INCH STEEL AND INSTALL 81 FEET OF 6 INCH POLY ALONG AVENUE M IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY SEPTEMBER 1485 080.61058 722 INSTALL 2427 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK PHASE 7. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER 1486 080.61069 15 INSTALL 708 FEET OF 2 INCH POLY ALONG COMMERCIAL AVENUE AND ABANDON 687 FEET OF 2 INCH STEEL AND 13 FEET OF 2 INCH AND 3 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANSON SYSTEM INTEGRITY SEPTEMBER 1487 080.61071 80 RELOCATE FACILITIES. INSTALL 4 FEET OF 3 INCH AND 1096 FEET OF 4 INCH AND 1041 FEET OF 6 INCH POLY AND ABANDON 1090 FEET OF 3 INCH POLY AND 318 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF SAN ANGELO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO RELOCATION OF FACILITIES SEPTEMBER 1488 080.61072 20 INSTALL 498 FEET OF 4 INCH POLY ALONG COLUMBUS STREET AND ABANDON 419 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 47 of 178 266 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1489 080.61075 (15) INSTALL 9334 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 4 INCH AND 500 FEET OF 8 INCH POLY AND 8700 FEET OF 6 INCH STEEL ALONG LINE E16 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER 1490 080.61087 31 INSTALL 318 FEET OF 2 INCH AND 325 FEET OF 6 INCH AND 304 FEET OF 12 INCH POLY ALONG MILL STREET AND ABANDON 437 FEET OF 2 INCH STEEL AND 624 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 1491 080.61088 1 INSTALL DISTRICT REGULATOR STATION 71 AND ABANDON DISTRICT REGULATOR STATION IN ABILENE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 1492 080.61101 2,048 RELOCATE FACILITIES. INSTALL 134 FEET OF 2 INCH POLY AND 443 FEET OF 4 INCH POLY AND ABANDON 95 FEET OF 2 INCH STEEL AND 375 FEET OF 3 INCH STEEL AND 479 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF CHICO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHICO RELOCATION OF FACILITIES OCTOBER 1493 080.61116 5 INSTALL 333 FEET OF 2 INCH POLY ALONG CEDAR AND ABANDON 262 FEET OF 2 INCH STEEL AND 65 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 1494 080.61119 19 RELOCATE FACILITIES. INSTALL 267 FEET OF 4 INCH POLY AND 170 FEET OF 6 INCH POLY AND ABANDON 263 FEET OF 3 INCH STEEL AND 167 FEET OF 6 INCH STEEL ALONG SPRING GROVE TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 1495 080.61121 7,745 RELOCATE FACILITIES. INSTALL 600 FEET OF 4 INCH POLY AND 1409 FEET OF 6 INCH POLY AND ABANDON 1469 FEET OF 6 INCH STEEL AND 445 FEET OF 8 INCH STEEL ALONG US 67 TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 1496 080.61133 19 PURCHASE (25) MOTORIZED REGULATORS AND ABANDON (25) MOTORIZED REGULATORS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1497 080.61144 15 INSTALL 16 FEET OF 2 INCH AND 17 FEET OF 8 INCH POLY ALONG DONALD AND ABANDON 3 INCH FLANGE VALVE AND 23 FEET OF 3 INCH AND 9 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 1498 080.61146 332 RELOCATE FACILITIES. INSTALL (40) POLY SERVICES AND ABANDON (40) STEEL SERVICES ALONG EAST MITCHELL STREET TO ACCOMMODATE THE CITY OF ARLINGTON PAVING AND DRAINAGE PLAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 1499 080.61162 13 RELOCATE FACILITIES. INSTALL 339 FEET OF 2 INCH POLY ALONG BEVERLY DRIVE AND ABANDON 334 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF BEVERLY HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEVERLY HILLS RELOCATION OF FACILITIES SEPTEMBER 1500 080.61165 0 ABANDON 2835 FEET OF 2 INCH, 1577 FEET OF 3 INCH AND 1580 FEET OF 8 INCH STEEL ALONG HOMEVIEW AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1501 080.61182 378 INSTALL 1275 FEET OF 2 INCH POLY AND ABANDON 800 FEET OF 4 INCH AND 300 FEET OF 8 INCH CAST IRON ALONG SCURRY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1502 080.61183 152 INSTALL 1455 FEET OF 2 INCH POLY ALONG SAN JACINTO STREET AND ABANDON 200 FEET OF 4 INCH, 1000 FEET OF 8 INCH CAST IRON AND 335 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1503 080.61193 36 RELOCATE FACILITIES. INSTALL 55 FEET OF 2 INCH AND 171 FEET OF 4 INCH POLY ALONG NANCY DRIVE AND ABANDON 40 FEET OF 2 INCH POLY AND 37 FEET OF 3 INCH AND 106 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF GLEN ROSE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLEN ROSE RELOCATION OF FACILITIES OCTOBER 1504 080.61196 204 INSTALL (2) DISTRICT REGULATOR STATIONS AND 200 FEET OF 6 INCH STEEL ALONG COMANCHE STREET AND ABANDON (2) DISTRICT REGULLATOR STATIONS AND 200 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER 1505 080.61204 4 INSTALL 380 FEET OF 2 INCH POLY AND ABANDON 377 FEET OF 2 INCH STEEL ALONG MLK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY SEPTEMBER 1506 080.61214 146,395 INSTALL 2200 FEET OF 20 INCH STEEL ALONG THE STREETS OF VILLAGE CREEK SUBDIVISION AND ABANDON 1850 FEET OF 20 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KENNEDALE SYSTEM INTEGRITY OCTOBER 1507 080.61216 44 INSTALL 59 FEET OF 2 INCH AND 8 FEET OF 4 INCH AND 6 FEET OF 8 INCH STEELK ALONG KC30 AND ABANDON 60 FEET OF 2 INCH, 4 FEET OF 4 INCH AND 5 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLYDE SYSTEM INTEGRITY OCTOBER 1508 080.61227 44 INSTALL 1420 FEET OF 4 INCH POLY ALONG MAURICE AVENUE AND ABANDON 474 FEET OF 6 INCH STEEL, 428 FEET OF 4 INCH, 166 FEET OF 6 INCH CAST IRON AND 86 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1509 080.61247 95,224 RELOCATE FACILITIES. INSTALL 2,187 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY AND ABANDON 140 FEET OF 6 INCH, 2,045 FEET OF 4 INCH, 30 FEET OF 3 INCH AND 2,150 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1510 080.61259 61 RELOCATE FACILITIES. INSTALL 1900 FEET OF 4 INCH POLY AND ABANDON 940 FEET OF 3 INCH POLY ALONG AIRPORT ROAD TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1511 080.61272 8 INSTALL 520 FEET OF 2 INCH POLY ALONG EAST MORRIS STREET AND ABANDON 510 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY SEPTEMBER 1512 080.61273 12 INSTALL 535 FEET OF 2 INCH POLY ALONG MAGNOLIA STREET AND ABANDON 108 FEET OF 2 INCH POLY AND 163 FEET OF 3 INCH AND 688 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY OCTOBER 1513 080.61278 729 INSTALL 177 FEET OF 2 INCH POLY AND 473 FEET OF 4 INCH POLY ALONG GRAYSON STREET. ABANDON 546 FEET OF 2 INCH STEEL AND 6 FEET OF 2 INCH POLY AND 8 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS POTTSBORO SYSTEM INTEGRITY OCTOBER 1514 080.61300 1,649 INSTALL 1,420 FEET OF 2 INCH AND 3,800 FEET OF 4 INCH POLY ALONG BOX CANYON DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL NOLANVILLE GROWTH DECEMBER 1515 080.61305 10 RELOCATE FACILITIES. INSTALL 116 FEET OF 4 INCH POLY ALONG HARDIN STREET AND ABANDON 116 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES OCTOBER 1516 080.61307 190 RELOCATE FACILITIES. INSTALL 1584 FEET OF 4 INCH POLY AND ABANDON 414 FEET OF 2 INCH STEEL AND 1338 FEET OF 4 INCH POLY ALONG CULLUM DRIVE TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 1517 080.61310 7,656 INSTALL 15 FEET OF 2 INCH POLY AND 22 FEET OF 3 INCH POLY AND 1538 FEET OF 8 INCH POLY ALONG COIT ROAD AND ABANDON 23 FEET OF 2 INCH STEEL AND 28 FEET OF 3 INCH STEEL AND 1491 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY OCTOBER 1518 080.61312 50 INSTALL 1829 FEET OF 2 INCH POLY AND ABANDON 1795 FEET OF 3 INCH STEEL AND 670 FEET OF 4 INCH STEEL AND 62 FEET OF 4 INCH POLY ALONG OLD BETSY ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEENE SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 48 of 178 267 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1519 080.61319 2 INSTALL RELIEF VALVE AT DISTRICT REGULATOR STATION 01 ALONG ORIENT AND ABANDON RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ODELL SYSTEM INTEGRITY SEPTEMBER 1520 080.61325 2 RELOCATE FACILITIES. INSTALL 280 FEET OF 2 INCH POLY ALONG DUTTON AVENUE AND ABANDON 385 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES SEPTEMBER 1521 080.61326 5,121 INSTALL 2000 FEET OF 4 INCH AND 370 FEET OF 2 INCH POLY ALONG KIEST BOULEVARD AND ABANDON 2000 FEET OF 8 INCH AND 370 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1522 080.61327 2,335 INSTALL 3668 FEET OF 4 INCH POLY AND ABANDON 1415 FEET OF 4 INCH AND 303 FEET OF 6 INCH CAST IRON ALONG BIGHAM BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1523 080.61338 391 INSTALL 52 FEET OF 2 INCH POLY ALONG HAYNIE AVENUE AND 1556 FEET OF 4 INCH POLY AND ABANDON 1553 FEET OF 6 INCH CAST IRON AND 3 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER 1524 080.61343 1,257 INSTALL 2300 FEET OF 4 INCH POLY ALONG LOCKE AVENUE AND ABANDON 1229 FEET OF 8 INCH, 821 FEET OF 4 INCH CAST IRON, 305 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1525 080.61348 2,071 RELOCATE FACILITIES. ABANDON 242 FEET OF 1.25 INCH POLY AND 1973 FEET OF 2 INCH POLY ALONG LAKESHORE DRIVE TO ACCOMMODATE CITY OF LITTLE ELM STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LITTLE ELM RELOCATION OF FACILITIES OCTOBER 1526 080.61362 10,304 INSTALL 610 FEET OF 4 INCH POLY AND 1936 FEET OF 12 INCH POLY ALONG MALVEY ROAD AND ABANDON 1108 FEET OF 4 INCH POLY AND 1926 FEET OF 12 INCH STEEL AND 25 FEET OF 16 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1527 080.61371 711 RELOCATE FACILITIES. INSTALL 1587 FEET OF 4 INCH POLY ALONG EDGEHILL ROAD AND ABANDON 620 FEET OF 6 INCH AND 235 FEET OF 8 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1528 080.61373 7,010 INSTALL 3458 FEET OF 2 INCH POLY AND 761 FEET OF 4 INCH POLY AND 696 FEET OF 6 INCH POLY ALONG PORTER FARM ROAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER 1529 080.61375 23 RELOCATE FACILITIES. INSTALL 353 FEET OF 4 INCH POLY AND ABANDON 1225 FEET OF 2 INCH STEEL AND 20 FEET OF 2 INCH POLY ALONG HILLDALE ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1530 080.61392 18,360 INSTALL 3895 FEET OF 10 INCH STEEL AND ABANDON 3751 FEET OF 12 INCH STEEL ALONG LINE M IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEENE SYSTEM INTEGRITY OCTOBER 1531 080.61398 53 INSTALL 1175 FEET OF 4 INCH POLY AND ABANDON 1143 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 1532 080.61404 4 INSTALL 127 FEET OF 4 INCH POLY ALONG SENLAC DRIVE AND ABANDON 111 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY SEPTEMBER 1533 080.61408 8 INSTALL 315 FEET OF 2 INCH POLY ALONG ORCHARD STREET AND ABANDON 297 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG SYSTEM INTEGRITY SEPTEMBER 1534 080.61410 167 INSTALL 1900 FEET OF 4 INCH ALONG MACARTHUR BOULEVARD AND ABANDON 1200 FEET OF 4 INCH AND 1260 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER 1535 080.61414 33,682 RELOCATE FACILITIES. INSTALL 1104 FEET OF 2 INCH POLY AND 1877 FEET OF 8 INCH POLY AND 555 FEET OF 12 INCH STEEL AND ABANDON 350 FEET OF 2 INCH STEEL AND 890 FEET OF 2 INCH POLY AND 185 FEET OF 6 INCH STEEL AND 3385 FEET OF 8 INCH STEEL AND 95 FEET OF 8 INCH POLY AND 375 FEET OF 12 INCH STEEL ALONG DALLAS STREETS TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 1536 080.61436 62 RELOCATE FACILITIES. INSTALL 1047 FEET OF 2 INCH POLY ALONG CAIRN CIRCLE AND ABANDON 1040 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1537 080.61438 186 RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY ALONG MORRISON STREET AND ABANDON 500 FEET OF 1.25 INCH STEEL TO ACCOMMODATE CITY OF ATHENS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS RELOCATION OF FACILITIES OCTOBER 1538 080.61444 988 RELOCATE FACILITIES. INSTALL 1076 FEET OF 6 INCH AND 958 FEET OF 2 INCH POLY ALONG WAYSIDE AVENUE AND ABANDON 1062 FEET OF 6 INCH, 963 FEET OF 2 INCH STEEL, 73 FEET OF 6 INCH AND 187 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1539 080.61448 15 RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG UPLAND AND ABANDON 380 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE RELOCATION OF FACILITIES OCTOBER 1540 080.61453 (681) RELOCATE FACILITIES. INSTALL 3100 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY ALONG HOUSTON STREET AND ABANDON 3080 FEET OF 4 INCH, 90 FEET OF 2 INCH STEEL AND 90 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF KAUFMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN RELOCATION OF FACILITIES OCTOBER 1541 080.61461 33 RELOCATE FACILITIES. INSTALL 340 FEET OF 4 INCH POLY ALONG DEER PARK ROAD AND ABANDON 830 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DECATUR STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR RELOCATION OF FACILITIES OCTOBER 1542 080.61462 3,881 RELOCATE FACILITIES. INSTALL 21 FEET OF 2 INCH POLY AND 223 FEET OF 4 INCH POLY AND ABANDON 25 FEET OF 2 INCH STEEL AND 216 FEET OF 4 INCH STEEL ALONG KING ROW TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1543 080.61475 243 RELOCATE FACILITIES. INSTALL 185 FEET OF 2 INCH, 1060 FEET OF 4 INCH AND 2940 FEET OF 6 INCH POLY ALONG 5TH STREET AND ABANDON 2495 FEET OF 3 INCH STEEL, 175 FEET OF 2 INCH AND 1050 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF SACHSE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SACHSE RELOCATION OF FACILITIES OCTOBER 1544 080.61482 52 INSTALL 1455 FEET OF 2 INCH POLY ALONG KENWELL AND ABANDON 1455 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1545 080.61488 56 RELOCATE FACILITIES. INSTALL 1000 FEET OF 2 INCH POLY ALONG LA SALLE DRIVE AND ABANDON 1000 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES OCTOBER 1546 080.61493 6 RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH POLY ALONG LATTIMORE DRIVE AND ABANDON 220 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 1547 080.61502 3 INSTALL 300 FEET OF 4 INCH POLY ALONG COGGIN AND ABANDON 300 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY SEPTEMBER 1548 080.61533 75 INSTALL 583 FEET OF 2 INCH POLY AND ABANDON 563 FEET OF 2 INCH STEEL AND 10 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY OCTOBER MTX Additions Page 49 of 178 268 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1549 080.61538 3 ABANDON DISTRICT REGULATOR STATION 28 ALONG RANDOLPH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER 1550 080.61540 523 INSTALL 2260 FEET OF 6 INCH POLY ALONG COBER DRIVE AND ABANDON 2260 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 1551 080.61544 5,460 RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH POLY AND 720 FEET OF 4 INCH POLY AND 1210 FEET OF 6 INCH POLY ALONG VALERA COURT AND ABANDON 114 FEET OF 2 INCH STEEL AND 42 FEET OF 4 INCH POLY AND 765 FEET OF 6 INCH STEEL AND 46 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1552 080.61545 2 RELOCATE FACILITIES. INSTALL 30 FEET OF 4 INCH POLY ALONG AUGUSTA STREET AND ABANDON 20 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF THE COLONY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THE COLONY RELOCATION OF FACILITIES SEPTEMBER 1553 080.61552 4,196 INSTALL 2790 FEET OF 4 INCH POLY AND ABANDON 1475 FEET OF 8 INCH STEEL AND 390 FEET OF 8 INCH POLY ALONG NORTH FIELDER ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 1554 080.61558 3 INSTALL FLOW SAFE RELIEF VALVE AND ABANDON ROKWELL RELIEF VALVE AT CLARKSVILLE DISTRICT REGULATOR STATION 7 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLARKSVILLE SYSTEM INTEGRITY SEPTEMBER 1555 080.61566 1,362 RELOCATE FACILITIES. INSTALL 503 FEET OF 2 INCH POLY AND 235 FEET OF 4 INCH POLY AND ABANDON 10 FEET OF 2 INCH STEEL AND 480 FEET OF 2 INCH POLY AND 6 FEET OF 3 INCH POLY AND 2 FEET OF 4 INCH STEEL AND 32 FEET OF 4 INCH POLY ALONG JOHNSON STREET TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES OCTOBER 1556 080.61573 153 INSTALL 1428 FEET OF 2 INCH POLY ALONG BROOKHOLLOW AND ABANDON 1403 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TYLER SYSTEM INTEGRITY OCTOBER 1557 080.61594 42,740,125 DALLAS CAST IRON REPLACEMENT FUNCTIONAL PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 1558 080.61595 12,636,736 FUNCTIONAL FORT WORTH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 1559 080.61597 2,083,886 FUNCTIONAL DALLAS UNIVERSITY PARK CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1560 080.61600 26 RELOCATE FACILITIES. INSTALL 781 FEET OF 2 INCH POLY AND ABANDON 768 FEET OF 2 INCH STEEL ALONG OVERLAKE STREET TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES SEPTEMBER 1561 080.61622 82,200 RELOCATE FACILITIES. INSTALL 1,863 FEET OF 6 INCH POLY, 749 FEET OF 4 INCH AND 170 FEET OF 2 INCH POLY ALONG FM 1417 AND ABANDON 1,615 FEET OF 2 INCH, 186 FEET OF 2 INCH, 312 FEET OF 3 INCH, AND 576 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF SHERMAN TXDOT PROJECT IN ACCORDANCE WIT RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES OCTOBER 1562 080.61625 5,597 ABANDON 200 FEET OF 8 INCH STEEL ALONG SOLANA BOULEVARD TO ACCOMMODATE TEXAS DEPARTMENT OF TRANSPORTATION STATE HIGHWAY IMPROVEMENT PROJECT IN THE CITY OF WESTLAKE, TEXAS, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTLAKE SYSTEM INTEGRITY OCTOBER 1563 080.61630 7 INSTALL GROUNDBED AND POLE ALONG 2ND STREET IN ORDER TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY SEPTEMBER 1564 080.61634 754 INSTALL 1110 FEET OF 2 INCH AND 380 FEET OF 4 INCH POLY AND ABANDON 740 FEET OF 4 INCH, 370 FEET OF 6 INCH AND 360 FEET OF 8 INCH CAST IRON ALONG PEMBROKE AVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1565 080.61641 23 INSTALL WELD SLEEVE ALONG LINE D DIG IN DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY SEPTEMBER 1566 080.61651 17 RELOCATE FACILITIES. INSTALL 345 FEET OF 2 INCH POLY AND ABANDON 365 FEET OF 2 INCH STEEL ALONG RIDGEWOOD DRIVE TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES SEPTEMBER 1567 080.61652 235,229 RELOCATE FACILITIES. INSTALL 950 FEET OF 2 INCH, 7500 FEET OF 4 INCH AND 5750 FEET OF 6 INCH POLY ALONG CRANBROOK DRIVE AND ABANDON 1010 FEET OF 2 INCH, 325 FEET OF 3 INCH AND 1250 FEET OF 4 INCH POLY AND 420 FEET OF 2 INCH AND 5150 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF COLLEYVILLE ROADWAY IMPROVEMENTS IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS COLLEYVILLE RELOCATION OF FACILITIES OCTOBER 1568 080.61671 12 INSTALL 250 FEET OF 4 INCH AND 30 FEET OF 6 INCH POLY ALONG PARADISE AND ABANDON 250 FEET OF 4 INCH STEEL AND 30 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY SEPTEMBER 1569 080.61672 206 RELOCATE FACILITIES. INSTALL 1300 FEET OF 2 INCH POLY ALONG LONSDALE AVENUE AND ABANDON 1300 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 1570 080.61677 14 RELOCATE FACILITIES. INSTALL 542 FEET OF 2 INCH POLY ALONG WIND RIVER LANE AND ABANDON 420 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES SEPTEMBER 1571 080.61684 12 INSTALL 5 FEET OF 12 INCH HALF SOLE ALONG CA(2ND) EAST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1572 080.61686 5,115 INSTALL 2166 FEET OF 6 INCH POLY AND ABANDON 2160 FEET OF 6 INCH STEEL AND 171 FEET OF 6 INCH POLY ALONG WALNUT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 1573 080.61688 4,154 RELOCATE FACILITIES. INSTALL 632 FEET OF 6 INCH POLY AND ABANDON 564 FEET OF 6 INCH POLY ALONG BERKSHIRE LAKE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1574 080.61692 39 INSTALL 387 FEET OF 3 INCH STEEL AND ABANDON 370 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILFORD SYSTEM INTEGRITY OCTOBER 1575 080.61696 (0) ABANDON 290 FEET OF 3 INCH POLY ALONG SANDERS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FROST SYSTEM INTEGRITY SEPTEMBER 1576 080.61699 2,402 INSTALL 1313 FEET OF 2 INCH POLY AND ABANDON 1308 FEET OF 2 INCH STEEL ALONG DAKOTA DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 1577 080.61702 2,858 INSTALL 1380 FEET OF 4 INCH POLY ALONG WEST CELESTE DRIVE AND ABANDON 1370 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 1578 080.61715 2 INSTALL 16 FEET OF 8 INCH POLY AND ABANDON 30 FEET OF 3 INCH STEEL AND 25 FEET OF 8 INCH STEEL ALONG HAMPTON ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1579 080.61716 21 RELOCATE FACILITIES. INSTALL 624 FEET OF 2 INCH POLY ALONG EAST ELLIS STREET AND ABANDON 624 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF LLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LLANO RELOCATION OF FACILITIES OCTOBER 1580 080.61718 1,056 INSTALL 1470 FEET OF 2 INCH POLY AND 2217 FEET OF 4 INCH POLY ALONG PARK LANE AND ABANDON 1320 FEET OF 2 INCH STEEL AND 665 FEET OF 2 INCH POLY AND 2210 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1581 080.61721 26 RELOCATE FACILITIES. INSTALL 370 FEET OF 6 INCH POLY AND ABANDON 370 FEET OF 6 INCH POLY ALONG STEINBECK BEND ROAD TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES SEPTEMBER MTX Additions Page 50 of 178 269 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1582 080.61724 22 INSTALL 510 FEET OF 4 INCH POLY AND ABANDON 408 FEET OF 3 INCH POLY ALONG BEADY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 1583 080.61750 59 RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH AND 80 FEET OF 4 INCH POLY AND ABANDON 500 FEET OF 2 INCH AND 80 FEET OF 4 INCH STEEL ALONG HAWKINS STREET TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE RELOCATION OF FACILITIES OCTOBER 1584 080.61774 9 INSTALL 24 FEET OF 2 INCH AND 14 FEET OF 4 INCH POLY AND ABANDON 12 FEET OF 4 INCH STEEL AND 20 FEET OF 4 INCH POLY AND REPLACE DRS01 ALONG SHERMAN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY OCTOBER 1585 080.61787 410 RELOCATE FACILITIES. INSTALL 400 FEET OF 6 INCH POLY AND ABANDON 400 FEET OF 6 POLY ALONG INDUSTRIAL BOULEVARD TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES OCTOBER 1586 080.61794 24 INSTALL 1 FEET OF 3 INCH POLY AND 32 FEET OF 4 INCH POLY AND 35 FEET OF 6 INCH POLY ALONG WEST PARK STREET, ABANDON 30 FEET OF 2 INCH POLY AND 24 FEET OF 6 INCH STEEL AND 4 FEET OF 6 INCH POLY, AND REPLACE DRS24 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 1587 080.61795 43 RELOCATE FACILITIES. INSTALL 860 FEET OF 2 INCH POLY AND ABANDON 830 FEET OF 2 INCH STEEL ALONG BRIARMEADOW DRIVE TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 1588 080.61799 2,576 INSTALL 700 FEET OF 4 INCH POLY ALONG 26TH STREET AND ABANDON 413 FEET OF 3 INCH, 141 FEET OF 4 INCH STEEL AND 5 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER 1589 080.61807 45 INSTALL (5) 220 STYLE WELD SLEEVES ALONG LINE D IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY SEPTEMBER 1590 080.61845 3 ABANDON 9 FEET OF 2 INCH AND 294 FEET OF 3 INCH STEEL ALONG SH22 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FROST SYSTEM INTEGRITY SEPTEMBER 1591 080.61855 10 INSTALL 516 FEET OF 2 INCH POLY AND ABANDON 312 FEET OF 2 INCH STEEL AND 155 FEET OF 4 INCH STEEL AND 64 FEET OF 2 INCH POLY ALONG FILLMORE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 1592 080.61880 877 INSTALL 49 FEET OF 4 INCH, 6140 FEET OF 6 INCH, 314 FEET OF 12 INCH POLY, AND 110 FEET OF 16 INCH STEEL CASING ALONG COUNTY ROAD 368. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ANNA GROWTH MARCH 1593 080.61884 415 RELOCATE FACILITIES. INSTALL 215 FEET OF 2 INCH AND 1135 FEET OF 4 INCH AND 660 FEET OF 6 INCH POLY ALONG CRAWFORD AND ABANDON 1990 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FATE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FATE RELOCATION OF FACILITIES OCTOBER 1594 080.61891 133 INSTALL 665 FEET OF 2 INCH POLY ALONG MILLER AND ABANDON 665 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEYMOUR SYSTEM INTEGRITY OCTOBER 1595 080.61892 23 INSTALL 300 FEET OF 2 INCH POLY ALONG HIGHWAY 380 AND ABANDON 300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THROCKMORTON SYSTEM INTEGRITY OCTOBER 1596 080.61893 16 INSTALL 335 FEE OF 2 INCH POLY ALONG IDAHO AND ABANDON 335 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEYMOUR SYSTEM INTEGRITY SEPTEMBER 1597 080.61899 14 RELOCATE FACILITIES. INSTALL 70 FEET OF 2 INCH AND 930 FEET OF 4 INCH POLY AND ABANDON 60 FEET OF 2 INCH AND 900 FEET OF 4 INCH POLY ALONG FIREWHEEL DRIVE TO ACCOMMODATE CITY OF FLOWER MOUND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND RELOCATION OF FACILITIES SEPTEMBER 1598 080.61903 20 INSTALL 100 FEET OF 2 INCH AND 20 FEET OF 4 INCH AND 250 FEET OF 8 INCH POLY ALONG UNIVERSITY HILLS BOULEVARD AND ABANDON 98 FEET OF 2 INCH AND 18 FEET OF 3 INCH AND 245 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1599 080.61912 1,093 INSTALL 400 FEET OF 4 INCH POLY ALONG EAST WALKER AND ABANDON 400 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY OCTOBER 1600 080.61916 82 RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG GOSHEN AND ABANDON 280 FEET OF 2 INCH POLY AND 620 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF CANTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CANTON RELOCATION OF FACILITIES OCTOBER 1601 080.61918 28,383 RELOCATE FACILITIES. INSTALL 375 FEET OF 4 INCH AND 60 FEET OF 6 INCH POLY ALONG WENTWORTH STREET AND ABANDON 375 FEET OF 4 INCH AND 60 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1602 080.61919 8 ABANDON DISTRICT REGULATOR STATION 3 IN MCGREGOR IN MCLENNAN COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY SEPTEMBER 1603 080.61928 1,108 RELOCATE FACILITIES. INSTALL 2880 FEET OF 4 INCH POLY ALONG STUART ROAD AND ABANDON 59 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1604 080.61930 2,958 RELOCATE FACILITIES. INSTALL 1297 FEET OF 2 INCH POLY AND ABANDON 816 FEET OF 2 INCH POLY ALONG COUNTRY CLUB ROAD TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 1605 080.61931 153 RELOCATE FACILITIES. INSTALL 1710 FEET OF 2 INCH POLY ALONG 4TH STREET AND ABANDON 1480 FEET OF 2 INCH AND 270 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF KENNEDALE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KENNEDALE RELOCATION OF FACILITIES OCTOBER 1606 080.61937 1,488 RELOCATE FACILITIES. INSTALL 1320 FEET OF 4 INCH AND 400 FEET OF 2 INCH POLY ALONG FM148 AND ABANDON 1310 FEET OF 4 INCH STEEL AND 290 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF SCURRY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SCURRY RELOCATION OF FACILITIES OCTOBER 1607 080.61944 1 RELOCATE FACILITIES. INSTALL 72 FEET OF 2 INCH POLY ALONG 1ST AVENUE AND ABANDON 72 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 1608 080.61946 3 RELOCATE FACILITIES. ABANDON 346 FEET OF 4 INCH POLY ALONG SIMONDALE DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1609 080.61947 67 INSTALL DISTRICT REGULATOR STATION AND RELIEF VALVE AT CORSICANA DISTRICT REGULATOR STATION 20 AND ABANDON DISTRICT REGULATOR STATION AND RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 1610 080.61964 3,808 INSTALL 1300 FEET OF 4 INCH POLY ALONG SHERWOOD DRIVE AND ABANDON 1050 FEET OF 3 INCH STEEL AND 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY OCTOBER 1611 080.61965 42,198 INSTALL 17,000 FEET OF 6 INCH STEEL AND ABANDON 17,000 FEET OF 3 INCH STEEL ON LINE S6 IN ELLIS COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RED OAK SYSTEM INTEGRITY OCTOBER 1612 080.61985 20 INSTALL 430 FEET OF 6 INCH AND 85 FEET OF 2 INCH POLY ALONG 7TH STREET AND ABANDON 428 FEET OF 8 INCH AND 346 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER MTX Additions Page 51 of 178 270 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1613 080.61989 3,097 RELOCATE FACILITIES. INSTALL 2357 FEET OF 4 INCH POLY ALONG SOMERVILLE PLACE AND ABANDON 2620 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1614 080.61991 69 RELOCATE FACILITIES. INSTALL 520 FEET OF 4 INCH AND 40 FEET OF 2 INCH POLY ALONG ELLA YOUNG DRIVE AND ABANDON 520 FEET OF 4 INCH AND 40 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1615 080.61994 131 RELOCATE FACILITIES. INSTALL 380 FEET OF 6 INCH AND 180 FEET OF 2 INCH POLY ALONG 23RD STREET AND ABANDON 380 FEET OF 6 INCH AND 180 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA RELOCATION OF FACILITIES OCTOBER 1616 080.61995 89,170 RELOCATE FACILITIES. ABANDON 96 FEET OF 2 INCH POLY AND 1046 FEET OF 10 INCH STEEL ALONG SMITH TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1617 080.62004 2,205 INSTALL 2200 FEET OF 2 INCH ALONG TAYLOR STREET AND ABANDON 1492 FEET OF 4 INCH STEEL, 756 FEET OF 3 INCH, 105 FEET OF 4 INCH POLY AND 160 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE SYSTEM INTEGRITY OCTOBER 1618 080.62014 490 RELOCATE FACILITIES. INSTALL 3138 FEET OF 4 INCH POLY ALONG TEX BOULEVARD AND ABANDON 2621 FEET OF 4 INCH CAST IRON AND 40 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1619 080.62019 8,674 RELOCATE FACILITIES. INSTALL 2500 FEET OF 8 INCH POLY ALONG TIERNEY ROAD AND ABANDON 2353 FEET OF 16 INCH, 69 FEET OF 4 INCH, 39 FEET OF 2 INCH STEEL AND 2239 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1620 080.62034 865 RELOCATE FACILITIES. INSTALL 2000 FEET OF 6 INCH POLY ALONG MIDWAY ROAD AND ABANDON 2000 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF LEWISVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE RELOCATION OF FACILITIES OCTOBER 1621 080.62036 3,623 INSTALL 9460 FEET OF 4 INCH POLY ALONG DALLAS STREET AND ABANDON 7500 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICE SYSTEM INTEGRITY OCTOBER 1622 080.62044 430 INSTALL 3800 FEET OF 2 INCH POLY ALONG HIGHWAY 80 AND ABANDON 3800 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER 1623 080.62048 (45) INSTALL 11,250 FEET OF 2 INCH, 2561 FEET OF 4 INCH, AND 2735 FEET OF 6 INCH POLY ALONG THE STREETS OF THE DOVE CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH JANUARY 1624 080.62049 1,170 RELOCATE FACILITIES. INSTALL 690 FEET OF 2 INCH POLY AND ABANDON 680 FEET OF 2 INCH POLY ALONG FLORES DRIVE TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER 1625 080.62052 1,350 INSTALL MEASURING STATION AND 400 FEET OF 6 INCH POLY AND ABANDON 1400 FEET OF 6 INCH STEEL ALONG STREETS OF DALLAS GLOBAL DEVELOPMENT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1626 080.62053 997 INSTALL 2955 FEET OF 4 INCH AND 1623 FEET OF 2 INCH POLY ALONG AVENUE J AND ABANDON 3967 FEET OF 3 INCH STEEL AND 20 FEET OF 2 INCH STEEL AND 132 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON SYSTEM INTEGRITY OCTOBER 1627 080.62055 12 INSTALL 455 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 560 FEET OF 4 INCH, 92 FEET OF 3 INCH AND 25 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAINT JO SYSTEM INTEGRITY OCTOBER 1628 080.62065 11 INSTALL 495 FEET OF 2 INCH POLY ALONG SHADY OAKS STREET AND ABANDON 395 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURNET SYSTEM INTEGRITY SEPTEMBER 1629 080.62070 115 RELOCATE FACILITIES. INSTALL 150 FEET OF 4 INCH POLY ALONG WOODARD AVENUE AND ABANDON 1074 FEET OF 4 INCH STEEL, 10 FEET OF 3 INCH AND 37 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF CLEBURNE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE RELOCATION OF FACILITIES OCTOBER 1630 080.62072 509 REPLACE DISTRICT REGULATOR STATION 1 ALONG OKLAHOMA AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER 1631 080.62084 10 RELOCATE FACILITIES. INSTALL 44 FEET OF 2 INCH POLY ALONG HAYS STREET AND ABANDON 44 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES OCTOBER 1632 080.62089 0 ABANDON 180 FEET OF 6 INCH STEEL ALONG GLENBROOK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 1633 080.62092 98,408 RELOCATE FACILITIES. INSTALL 108 FEET OF 2 INCH, 1145 FEET OF 4 INCH AND 650 FEET OF 8 INCH POLY ALONG US380 AND ABANDON 120 FEET OF 2 INCH, 310 FEET OF 3 INCH AND 1000 FEET OF 4 INCH POLY TO ACCOMMODATE TXDOT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1634 080.62093 61,832 RELOCATE FACILITIES. INSTALL 402 FEET OF 6 INCH POLY, 2,226 FEET OF 4 INCH POLY, 10 FEET OF 2 INCH POLY AND ABANDON 328 FEET OF 4 INCH POLY AND 20 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF SANGER PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER RELOCATION OF FACILITIES OCTOBER 1635 080.62099 5 INSTALL 125 FEET OF 4 INCH AND 225 FEET OF 2 INCH POLY ALONG WEST 26TH STREET AND ABANDON 125 FEET OF 3 INCH AND 225 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER 1636 080.62102 2,215 RELOCATE FACILITIES. INSTALL 1546 FEET OF POLY ALONG SHANNON AND ABANDON 205 FEET OF 2 INCH STEEL AND 1580 FEET OF 3 INCH AND 6 INCH POLY TO ACCOMMODATE CITY OF GEORGETOWN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN RELOCATION OF FACILITIES OCTOBER 1637 080.62146 65 INSTALL 430 FEET OF 2 INCH POLY ALONG EMERSON LANE AND ABANDON 290 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER 1638 080.62151 46 INSTALL 1525 FEET OF 4 INCH POLY ALONG CALHOUN STREET AND ABANDON 493 FEET OF 12 INCH STEEL AND 507 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1639 080.62160 3,981 RELOCATE FACILITIES. INSTALL 1460 FEET OF 4 INCH AND 1140 FEET OF 2 INCH POLY ALONG FM 984 AND ABANDON 2600 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF BARDWELL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BARDWELL RELOCATION OF FACILITIES OCTOBER 1640 080.62174 91 RELOCATE FACILITIES. INSTALL 170 FEET OF 2 INCH POLY ALONG FOXT STREET AND ABANDON 213 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CALDWELL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALDWELL RELOCATION OF FACILITIES OCTOBER 1641 080.62184 9 ABANDON DISTRICT REGULATOR STATION 11 IN MARLIN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY SEPTEMBER 1642 080.62185 4 ABANDON DISTRICT REGULATOR STATION 02 AND 80 FEET OF 4 INCH STEEL AND 13 FEET OF 4 INCH POLY ALONG JEFFERSON SOUTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY OCTOBER MTX Additions Page 52 of 178 271 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1643 080.62192 106 RELOCATE FACILITIES. INSTALL 150 FEET OF 6 INCH AND 25 FEET OF 2 INCH POLY ALONG ALMENA ROAD AND ABANDON 150 FEET OF 6 INCH AND 20 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF RIVER OAKS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS RELOCATION OF FACILITIES OCTOBER 1644 080.62202 537 RELOCATE FACILITIES. INSTALL 531 FEET OF 2 INCH POLY AND ABANDON 448 FEET OF 2 INCH STEEL ALONG ELIZABETH STEET TO ACCOMMODATE CITY OF ROBINSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON RELOCATION OF FACILITIES OCTOBER 1645 080.62203 25 INSTALL 800 FEET OF 8 INCH POLY ALONG BRENTWOOD STAIR ROAD AND ABANDON 800 FEET OF 16 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1646 080.62204 3,282 RELOCATE FACILITIES. INSTALL 2850 FEET OF 4 INCH AND 250 FEET OF 2 INCH POLY ALONG DENISON STREET AND ABANDON 1863 FEET OF 3 INCH STEEL, 624 FEET OF 3 INCH, 44 FEET OF 2 INCH POLY, AND 100 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF ROBINSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON RELOCATION OF FACILITIES OCTOBER 1647 080.62206 3,397 RELOCATE FACILITIES. INSTALL 1512 FEET OF 2 INCH, 1323 FEET OF 4 INCH POLY AND ABANDON 2467 FEET OF 3 INCH STEEL AND 66 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF ROBINSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON RELOCATION OF FACILITIES OCTOBER 1648 080.62210 832 RELOCATE FACILITIES. INSTALL 492 FEET OF 2 INCH, 114 FEET OF 4 INCH POLY AND ABANDON 492 FEET OF 2 INCH AND 92 FEET OF 4 INCH STEEL AND 5 FEET OF 2 INCH POLY ALONG PEGGY DRIVE TO ACCOMMODATE CITY OF ROBINSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON RELOCATION OF FACILITIES OCTOBER 1649 080.62211 3,760 RELOCATE FACILITIES. INSTALL 1760 FEET OF 2 INCH POLY AND ABANDON 1744 FEET OF 2 INCH, 26 FEET OF 4 INCH STEEL ALONG LARRY STREET TO ACCOMMODATE CITY OF HALTOM CITY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY RELOCATION OF FACILITIES OCTOBER 1650 080.62212 2,822 RELOCATE FACILITIES. INSTALL 333 FEET OF 2 INCH, 1012 FEET OF 4 INCH POLY AND ABANDON 417 FEET OF 2 INCH AND 992 FEET OF 3 INCH STEEL AND 4 FEET OF 2 INCH POLY ALONG MONNA STREET TO ACCOMMODATE CITY OF HALTOM CITY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY RELOCATION OF FACILITIES OCTOBER 1651 080.62213 60,394 RELOCATE FACILITIES. INSTALL 2157 FEET OF 6 INCH POLY AND ABANDON 2157 FEET OF 2 INCH STEEL ALONG KERLEY AND DUNCAN STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1652 080.62218 226 RELOCATE FACILITIES. INSTALL 1654 FEET OF 4 INCH AND 806 FEET OF 2 INCH POLY ALONG BREWSTER STREET AND ABANDON 2460 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF ROBINSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON RELOCATION OF FACILITIES OCTOBER 1653 080.62219 958 INSTALL 540 FEET OF 2 INCH POLY AND ABANDON 734 FEET OF 2 INCH STEEL ALONG AVENUE A TO ACCOMMODATE THE CITY OF CLIFTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON SYSTEM INTEGRITY OCTOBER 1654 080.62221 523 INSTALL DEEP WELL GROUND BED AND RECTIFIER AND ABANDON DEEP WELL GROUND BED AND RECTIFIER ON LINE M IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MAYPEARL SYSTEM INTEGRITY OCTOBER 1655 080.62227 16,082 INSTALL 3000 FEET OF 4 INCH AND 3900 FEET OF 2 INCH POLY ALONG THE STREETS OF LAVON FARMS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LAVON GROWTH OCTOBER 1656 080.62229 948 RELOCATE FACILITIES. INSTALL 223 FEET OF 6 INCH POLY ALONG OAK MILL CREEK ROAD AND ABANDON 286 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1657 080.62236 2,060,760 FUNCTIONAL PROJECT TO REPLACE 5 FEET TO 250 FEET SECTIONS OF MAIN IN SOUTHEAST DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1658 080.62276 634 INSTALL 800 FEET OF 2 INCH POLY AND ABANDON 618 FEET OF 2 INCH STEEL AND 88 FEET OF 2 INCH POLY ALONG CONGER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUITMAN SYSTEM INTEGRITY OCTOBER 1659 080.62278 33,449 INSTALL 4058 FEET OF 2 INCH, 1926 FEET OF 4 INCH, 39 FEET OF 6 INCH, 746 FEET OF 12 INCH POLY AND ABANDON 706 FEET OF 3 INCH POLY, 2916 FEET OF 3 INCH AND 2062 FEET OF 6 INCH AND 1889 FEET OF 12 INCH STEEL ALONG BONHAM IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1660 080.62279 2,837 INSTALL 60 FEET OF 12 INCH STEEL ALONG ABRAMS ROAD AND ABANDON 60 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1661 080.62280 2,069 INSTALL 1054 FEET OF 4 INCH POLY AND ABANDON 39 FEET OF 3 INCH AND 999 FEET OF 6 INCH STEEL ALONG MAPLELEAF IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1662 080.62283 53 INSTALL 175 FEET OF 4 INCH POLY ALONG CARL STREET AND ABANDON 175 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 1663 080.62295 (173) RELOCATE FACILITIES. INSTALL 1400 FEET OF 4 INCH POLY ALONG SUNSET STREET AND ABANDON 525 FEET OF 2 INCH AND 8355 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF SULPHUR SPRINGS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS RELOCATION OF FACILITIES OCTOBER 1664 080.62297 3,497 RELOCATE FACILITIES. INSTALL 1568 FEET OF 4 INCH AND 4 FEET OF 6 INCH POLY AND ABANDON 30 FEET OF 6 INCH POLY AND 53 FEET OF 3 INCH AND 102 FEET OF 6 INCH AND 1917 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 1665 080.62303 565 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION ALONG THE STREETS OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1666 080.62309 3,379 INSTALL 11 FEET OF 2 INCH AND 1426 FEET OF 4 INCH POLY AND ABANDON 11 FEET OF 2 INCH POLY AND 1426 FEET OF 4 INCH STEEL ALONG FAIRBROOK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER 1667 080.62310 22,082 INSTALL 225 FEET OF 4 INCH POLY, 2200 FEET OF 6 INCH IP POLY AND 550 FEET OF 8 INCH IP POLY ALONG LEON STREET, LEVITA, AND HIGHLAND. ABANDON 116 FEET OF 2 INCH POLY, 1450 FEET OF 3 INCH STEEL AND 380 FEET OF 2 INCH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE SYSTEM INTEGRITY OCTOBER 1668 080.62311 16,701 INSTALL 1769 FEET OF 8 INCH, 1217 FEET OF 4 INCH AND 5557 FEET OF 2 INCH POLY ALONG THE STREETS OF WOLF RANCH WEST SECTION 4A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH NOVEMBER 1669 080.62312 4,763 INSTALL 4010 FEET OF 4 INCH, 300 FEET OF 6 INCH POLY AND ABANDON 1042 FEET OF 2 INCH AND 1066 FEET OF 3 INCH AND 150 FEET OF 4 INCH STEEL AND 395 FEET OF 2 INCH AND 1948 FEET OF 3 INCH POLY ALONG MILL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CUMBY SYSTEM INTEGRITY OCTOBER 1670 080.62313 28,747 RELOCATE FACILITIES. INSTALL 1120 FEET OF 4 INCH POLY AND ABANDON 670 FEET OF 4 INCH STEEL AND 280 FEET OF 4 INCH POLY ALONG MAIN STREET AND AVENUE A IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER MTX Additions Page 53 of 178 272 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1671 080.62315 5,509 RELOCATE FACILITIES. INSTALL 840 FEET OF 2 INCH POLY AND 174 FEET OF 4 INCH POLY AND ABANDON 700 FEET OF 2 INCH STEEL AND 54 FEET OF 2 INCH POLY AND 148 FEET OF 4 INCH POLY ALONG DOROTHY TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES OCTOBER 1672 080.62328 59 INSTALL 425 FEET 2 INCH POLY ON PINE STREET AND ABANDON 672 FEET 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 1673 080.62333 1 ABANDON 489 FEET OF 2 INCH STEEL ALONG OFFUTT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 1674 080.62336 (7) ABANDON DISTRICT REGULATOR STATION 8 IN TAYLOR COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 1675 080.62338 13 INSTALL 508 FEET OF 4 INCH POLY ALONG 1ST STREET AND ABANDON 508 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILLICOTHE SYSTEM INTEGRITY OCTOBER 1676 080.62339 (0) ABANDON DISTRICT REGULATOR STATION 7 IN TOM GREEN COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY SEPTEMBER 1677 080.62341 (0) ABANDON DISTRICT REGLUATOR STATION 49 IN TOM GREEN COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY SEPTEMBER 1678 080.62357 20,954 RELOCATE FACILITIES. INSTALL 422 FEET OF 2 INCH POLY AND 1141 FEET OF 4 INCH POLY AND 14 FEET OF 6 INCH POLY AND 2279 FEET OF 8 INCH POLY AND 175 FEET OF 12 INCH POLY AND ABANDON 147 FEET OF 2 INCH POLY AND 769 FEET OF 4 INCH STEEL AND 1234 FEET OF 4 INCH POLY AND 2193 FEET OF 6 INCH STEEL AND 753 FEET OF 6 INCH POLY AND 156 FEET OF 12 INCH STEEL ALONG CAMP BOWIE BOULEVARD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1679 080.62358 11,937 RELOCATE FACILITIES. ABANDON 150 FEET OF 2 INCH STEEL AND 301 FEET OF 2 INCH POLY AND 941 FEET OF 3 INCH STEEL AND 1364 FEET OF 3 INCH POLY AND 46 FEET OF 4 INCH POLY AND 2867 FEET OF 6 INCH POLY ALONG RM 620 TO ACCOMMODATE CITY OF ROUND ROCK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK RELOCATION OF FACILITIES OCTOBER 1680 080.62359 1,380 INSTALL 257 FEET OF 2 INCH POLY AND ABANDON 416 FEET OF 2 INCH STEEL AND 69 FEET OF 2 INCH POLY ALONG 16TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEMP SYSTEM INTEGRITY OCTOBER 1681 080.62366 7,430 INSTALL 1062 FEET OF 2 INCH POLY AND 3 FEET OF 3 INCH POLY AND ABANDON 74 FEET OF 2 INCH POLY AND 860 FEET OF 3 INCH STEEL AND 93 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MALAKOFF SYSTEM INTEGRITY OCTOBER 1682 080.62376 130 INSTALL 1300 FEET OF 2 INCH POLY ALONG 21ST STREET AND ABANDON 800 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 1683 080.62380 3,175 RELOCATE FACILITIES. INSTALL 568 FEET OF 2 INCH AND 556 FEET OF 4 INCH POLY AND ABANDON 375 FEET OF 2 INCH AND 1227 FEET OF 4 INCH AND 36 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF WATAUGA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WATAUGA RELOCATION OF FACILITIES OCTOBER 1684 080.62382 47 INSTALL 95 FEET OF 2 INCH 902 FEET OF 4 INCH AND 1305 FEET OF 6 INCH POLY ALONG ENTERPRISE AND ABANDON 15 FEET OF 4 INCH POLY AND 2123 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER 1685 080.62383 2,084 INSTALL 2440 FEET OF 2 INCH AND 534 FEET OF 4 INCH POLY AND ABANDON 75 FEET OF 2 INCH AND 583 FEET OF 3 INCH AND 822 FEET OF 4 INCH STEEL AND 868 FEET OF 3 INCH AND 169 FEET OF 2 INCH AND 150 FEET OF 4 INCH POLY ALONG 7TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY OCTOBER 1686 080.62386 24 RELOCATE FACILITIES. INSTALL 175 FEET OF 2 INCH AND 740 FEET OF 4 INCH POLY ALONG 8TH STREET AND ABANDON 915 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF VENUS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VENUS RELOCATION OF FACILITIES OCTOBER 1687 080.62387 8 INSTALL 625 FEET OF 2 INCH POLY ALONG 5TH STREET AND ABANDON 2520 FEET OF 3 INCH STEEL AND 140 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VENUS SYSTEM INTEGRITY OCTOBER 1688 080.62391 6,600 INSTALL 110 FEET OF 16 INCH, 110FEET OF 12 INCH STEEL AND 90 FEET OF 8 INCH POLY AND ABANDON 73 FEET OF 8 INCH POLY AND 93 FEET OF 12 INCH AND 60 FEET OF 16 INCH AND 34 FEET OF 18 INCH STEEL ALONG PETERSMITH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1689 080.62397 2 INSTALL 6 FEET OF 4 INCH POLY ALONG ROSEWOOD AND ABANDON DISTRICT REGULATOR STATION 3, 32 FEET OF 2 INCH AND 10 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 1690 080.62399 52,235 RELOCATE FACILITIES. INSTALL 792 FEET OF 4 INCH POLY AND ABANDON 275 FEET OF 2 INCH STEEL AND 533 FEET OF 2 INCH POLY AND 401 FEET OF 4 INCH POLY ALONG SOUTH LOCUST DRIVE TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1691 080.62404 197 RELOCATE FACILITIES. INSTALL 425 FEET OF 4 INCH POLY ALONG SOUTH PALESTINE AND ABANDON 425 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF ATHENS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS RELOCATION OF FACILITIES OCTOBER 1692 080.62408 3 ABANDON DISTRICT REGULATOR STATION 01 IN HARDEMAN COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS CHILLICOTHE SYSTEM INTEGRITY OCTOBER 1693 080.62409 (0) RELOCATE FACILITIES. ABANDON 55 FEET OF 6 INCH POLY ALONG 1700 SOUTH JENNINGS AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1694 080.62419 423 INSTALL 5286 FEET OF 2 INCH POLY ALONG 3RD STREET AND ABANDON 2947 FEET OF 4 INCH, 967 FEET OF 3 INCH STEEL, 1042 FEET OF 3 INCH, 335 FEET OF 2 INCH AND 615 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSEBUD SYSTEM INTEGRITY OCTOBER 1695 080.62420 6,924 INSTALL 7982 FEET OF 2 INCH POLY AND ABANDON 66 FEET OF 1.25 INCH, 197 FEET OF 2 INCH, 3148 FEET OF 3 INCH POLY, 155 FEET OF 2 INCH, 4132 FEET OF 3 INCH, AND 27 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSEBUD SYSTEM INTEGRITY OCTOBER 1696 080.62422 31,736 RELOCATE FACILITIES. INSTALL 611 FEET OF 2 INCH POLY AND 364 FEET OF 4 INCH POLY AND 146 FEET OF 6 INCH POLY AND ABANDON 611 FEET OF 2 INCH POLY AND 364 FEET OF 4 INCH POLY AND 146 FEET OF 6 INCH POLY ALONG CALENDER ROAD TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 1697 080.62423 87,932 INSTALL 25500 FEET OF 10 INCH STEEL ALONG LINE KP1 AND ABANDON 19300 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY DECEMBER 1698 080.62425 11,393 INSTALL 2455 FEET OF 2 INCH POLY ALONG WEST AVENUE EAST AND ABANDON 2580 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 1699 080.62439 2,106 INSTALL 1015 FEET OF 2 INCH POLY ALONG ALLEY OF COMANCHE TRAIL AND ABANDON 1005 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 1700 080.62441 4,311 INSTALL 1190 FEET OF 2 INCH POLY AND 942 FEET OF 4 INCH POLY ALONG SOUTH 3RD STREET AND ABANDON 1140 FEET OF 2 INCH STEEL AND 1272 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 1701 080.62447 1,748 INSTALL POLY SERVICES AND ABANDON STEEL SERVICES ALONG THE NORTHWEST DALLAS ZONE AREA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER MTX Additions Page 54 of 178 273 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1702 080.62448 16 RELOCATE FACILITIES. INSTALL 170 FEET OF 4 INCH POLY ALONG 3RD STREET AND ABANDON 175 FEET OF 4 INCH POLY, 4 INCH, AND 3 INCH STEEL TO ACCOMMODATE THE CITY OF TAYLOR STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR RELOCATION OF FACILITIES OCTOBER 1703 080.62457 373 INSTALL DISTRICT REGULATOR STATION IN ABILENE AND ABANDON DISTRICT REGULATOR STATION 22 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 1704 080.62461 6,788 INSTALL 1955 FEET OF 6 INCH POLY AND 60 FEET OF 10 INCH STEEL ALONG MONTE CARLO BOULEVARD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PRINCETON GROWTH MAY 1705 080.62492 4,034 INSTALL 1501 FEET OF 2 INCH POLY AND ABANDON 226 FEET OF 8 INCH STEEL AND 1236 FEET OF 16 INCH STEEL ALONG EAST 6TH STREET AND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER 1706 080.62513 2,063 RELOCATE FACILITIES. INSTALL 11 FEET OF 2 INCH POLY AND 4 FEET OF 3 INCH POLY AND 1452 FEET OF 4 INCH POLY AND ABANDON 1096 FEET OF 2 INCH STEEL AND 227 FEET OF 2 INCH POLY AND 110 FEET OF 3 INCH POLY ALONG YUCCA DRIVE TO ACCOMMODATE CITY OF FLOWER MOUND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND RELOCATION OF FACILITIES OCTOBER 1707 080.62517 165 INSTALL 340 FEET OF 2 INCH, 6 FEET OF 3 INCH AND 47 FEET OF 4 INCH POLY AND ABANDON 335 FEET OF 2 INCH, 40 FEET OF 4 INCH AND 6 FEET OF 3 INCH STEEL ALONG THE STREETS OF WEST WHITE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PILOT POINT SYSTEM INTEGRITY OCTOBER 1708 080.62523 23 INSTALL 800 FEET OF 2 INCH POLY ALONG WEST POINT AND ABANDON 800 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLORADO CITY SYSTEM INTEGRITY OCTOBER 1709 080.62527 20 INSTALL GROUNDBED AND RECTIFIER ALONG LINE L8AE1 AND ABANDON GROUNDBED AND RECTIFIER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GROESBECK SYSTEM INTEGRITY OCTOBER 1710 080.62553 95 INSTALL 1180 FEET OF 2 INCH POLY ALONG AUSTIN STREET AND ABANDON 932 FEET OF 4 INCH AND 432 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER 1711 080.62555 3,153 INSTALL 1170 FEET OF 6 INCH AND 130 FEET OF 2 INCH POLY ALONG CAMP BOWIE AND ABANDON 1170 FEET OF 6 INCH AND 130 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1712 080.62571 3,236 INSTALL 7 FEET OF 2 INCH, 139 FEET OF 3 INCH AND 490 FEET OF 4 INCH STEEL AND ABANDON 19 FEET OF 2 INCH, 104 FEET OF 3 INCH AND 482 FEET OF 4 INCH STEEL ALONG CNG-56-T IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EARLY SYSTEM INTEGRITY OCTOBER 1713 080.62590 (12) INSTALL REGULATOR AND RELIEF VALVE AT KWIKSET REGULATOR STATION AND ABANDON REGULATOR AND RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER 1714 080.62609 5,536 INSTALL 2966 FEET OF 2 INCH POLY AND ABANDON 2960 FEET OF 2 INCH POLY AND 60 FEET OF 4 INCH STEEL ALONG ROUGH CREEK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY OCTOBER 1715 080.62612 59 RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY ALONG HIGHWAY 283 AND ABANDON 99 FEET OF 3 INCH STEEL AND 99 FEET OF 3 INCH POLY TO ACCOMMODATE TXDOT STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY RELOCATION OF FACILITIES OCTOBER 1716 080.62613 37 RELOCATE FACILITIES. ABANDON 490 FEET OF 3 INCH POLY ALONG HIGHWAY 283 TO ACCOMMODATE CITY OF ALBANY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY RELOCATION OF FACILITIES SEPTEMBER 1717 080.62630 1,683 RELOCATE FACILITIES. INSTALL 535 FEET OF 4 INCH POLY AND 210 FEET OF 6 INCH POLY AND ABANDON 132 FEET OF 6 INCH STEEL ALONG MARSHALL DRIVE TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES OCTOBER 1718 080.62635 3 RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH POLY ALONG WICHITA STREET AND ABANDON 200 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FOREST HILL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL RELOCATION OF FACILITIES OCTOBER 1719 080.62637 42 INSTALL DISTRICT REGULATOR STATION ALONG MAIN STREET AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY OCTOBER 1720 080.62639 17 INSTALL 400 FEET OF 4 INCH POLY ALONG FM1644 AND ABANDON 375 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALVERT SYSTEM INTEGRITY OCTOBER 1721 080.62641 188 INSTALL 900 FEET OF 2 INCH POLY ALONG HENSEL DRIVE AND ABANDON 880 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 1722 080.62657 3,342 INSTALL 1500 FEET OF 4 INCH AND 500 FEET OF 2 INCH POLY AND ABANDON 2000 FEET OF 1.25 INCH POLY ALONG SH 34 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AVALON SYSTEM INTEGRITY OCTOBER 1723 080.62688 24 ABANDON 320 FEET OF 2 INCH STEEL ALONG BRENTS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1724 080.62689 9,841 RELOCATE FACILITIES. INSTALL 460 FEET OF 8 INCH AND 660 FEET OF 10 INCH STEEL ALONG US HIGHWAY 75 AND ABANDON 460 FEET OF 8 INCH AND 660 FEET OF 10 INCH STEEL TO ACCOMMODATE THE CITY OF SHERMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES OCTOBER 1725 080.62690 19 ABANDON 1247 FEET OF 2 INCH AND 476 FEET OF 1.25 INCH STEEL ALONG JAMES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY SEPTEMBER 1726 080.62691 782 RELOCATE FACILITIES. INSTALL 1242 FEET OF 4 INCH POLY ALONG GRANDE AVENUE AND ABANDON 904 FEET OF 2 INCH AND 338 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF CLEBURNE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE RELOCATION OF FACILITIES OCTOBER 1727 080.62693 166,805 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY CLIFTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON SYSTEM INTEGRITY OCTOBER 1728 080.62700 28,608 INSTALL 5605 FEET OF 2 INCH AND 909 FEET OF 6 INCH POLY ALONG THE STREETS OF BAR W RANCH PHASE 1 SECTION 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH FEBRUARY 1729 080.62714 81,036 RELOCATE FACILITIES. INSTALL 1011 FEET OF 4 INCH AND 989 FEET OF 6 INCH POLY ALONG FM 2818 AND ABANDON 238 FEET OF 4 INCH AND 500 FEET OF 6 INCH POLY AND 219 FEET OF 4 INCH AND 728 FEET OF 6 INCH STEEL TO ACCOMMODATE TXDOT HIGHWAY IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES OCTOBER 1730 080.62716 4,544 RELOCATE FACILITIES. INSTALL 280 FEET OF 2 INCH POLY AND 160 FEET OF 4 INCH POLY ALONG WOODVILLE ROAD AND ABANDON 220 FEET OF 2 INCH AND 110 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF BRYAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES OCTOBER 1731 080.62723 901 RELOCATE FACILITIES. INSTALL 345 FEET OF 2 INCH POLY AND ABANDON 30 FEET OF 2 INCH POLY ALONG LLANO STREET TO ACCOMMODATE CITY OF FREDERICKSBURG STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG RELOCATION OF FACILITIES OCTOBER 1732 080.62724 1,207 RELOCATE FACILITIES. INSTALL 1934 FEET OF 4 INCH POLY ALONG GRANDE AVENUE AND ABANDON 1148 FEET OF 4 INCH AND 337 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF CLEBURNE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE RELOCATION OF FACILITIES OCTOBER 1733 080.62726 6,030 RELOCATE FACILITIES. INSTALL 1875 FEET OF 2 INCH AND 1750 FEET OF 4 INCH POLY AND ABANDON 1820 FEET OF 2 INCH, 490 FEET OF 4 INCH STEEL AND 55 FEET OF 2 INCH AND 1260 FEET OF 4 INCH POLY ALONG THOMASSON TO ACCOMMODATE CITY OF MESQUITE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE RELOCATION OF FACILITIES OCTOBER MTX Additions Page 55 of 178 274 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1734 080.62735 282,667 RELOCATE FACILITIES. INSTALL 478 FEET OF 2 INCH POLY AND 1810 FEET OF 4 INCH POLY ALONG SOUTH LOCUST STREET AND ABANDON 182 FEET OF 2 INCH POLY AND 717 FEET OF 2 INCH STEEL AND 1158 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF DENTON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1735 080.62736 7,078 RELOCATE FACILITIES. INSTALL 1917 FEET OF 2 INCH POLY AND ABANDON 2211 FEET OF 2 INCH POLY AND 162 FEET OF 4 INCH POLY ALONG WAINWRIGHT STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1736 080.62737 4,516 INSTALL 6 RELIEF VALVES AND RETIRE 6 RELIEF VALVES IN THE SOUTHWEST SOUTH DISTRICT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR SYSTEM INTEGRITY OCTOBER 1737 080.62738 88,140 RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH, 809 FEET OF 4 INCH AND 2996 FEET OF 6 INCH POLY ALONG EAST ELM STREET AND ABANDON 781 FEET OF 3 INCH AND 470 FEET OF 4 INCH AND 1680 FEET OF 6 INCH STEEL AND 1380 FEET OF 4 INCH AND 500 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1738 080.62742 8,844 RELOCATE FACILITIES. INSTALL 823 FEET OF 2 INCH AND 3755 FEET OF 4 INCH POLY AND ABANDON 495 FEET OF 2 INCH, 4269 FEET OF 4 INCH STEEL AND 119 FEET OF 4 INCH AND 260 FEET OF 2 INCH POLY ALONG THE STREETS OF HANDLEY DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1739 080.62744 177 RELOCATE FACILITIES. INSTALL 267 FEET OF 2 INCH AND 5 FEET OF 3 INCH POLY ALONG WHIPPOORWILL LANE AND ABANDON 226 FEET OF 3 INCH STEEL AND 8 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1740 080.62752 252 INSTALL 150 FEET OF 8 INCH POLY ALONG HALL STREET AND ABANDON 150 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1741 080.62753 23,510 INSTALL 36 FEET OF 4 INCH STEEL AND 7618 FEET OF 6 INCH STEEL AND ABANDON 7353 FEET OF 4 INCH STEEL ALONG STREETS OF BROWNWOOD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER 1742 080.62756 3 ABANDON DISTRICT REGULATOR STATION 26 IN ABILENE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 1743 080.62759 1,621 INSTALL (50) PAX1 MOTORIZED REGULATORS AND ABANDON (50) PAX1 MOTORIZED REGULATORS. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1744 080.62760 15 RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY ALONG SKYLINE STREET AND ABANDON 90 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF ROWLETT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT RELOCATION OF FACILITIES OCTOBER 1745 080.62763 (1) INSTALL 329 FEET OF 2 INCH POLY ALONG AVENUE E AND ABANDON 329 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER 1746 080.62765 34,915 RELOCATE FACILITIES. INSTALL 3100 FEET OF 6 INCH POLY ALONG CHEEK SPARGER ROAD AND ABANDON 960 FEET OF 4 INCH POLY AND 1900 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF COLLEYVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE RELOCATION OF FACILITIES OCTOBER 1747 080.62778 50 INSTALL 850 FEET OF 6 INCH POLY ALONG HUFFINES AND ABANDON 650 FEET OF 6 INCH POLY AND 152 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY OCTOBER 1748 080.62791 461 RELOCATE FACILITIES. INSTALL 140 FEET OF 2 INCH POLY AND ABANDON 125 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF EDGECLIFF VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EDGECLIFF VILLAGE RELOCATION OF FACILITIES OCTOBER 1749 080.62802 2,165 INSTALL 4196 FEET OF 2 INCH POLY AND 3947 FEET OF 4 INCH POLY ALONG ALONG THE STREETS OF GREENWAY PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH SEPTEMBER 1750 080.62805 3,998 INSTALL 1340 FEET OF 4 INCH AND 75 FEET OF 2 INCH POLY ALONG WEST HEMPHILL STREET AND ABANDON 1100 FEET OF 6 INCH STEEL 260 FEET OF 6 INCH AND 60 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1751 080.62806 4,227 RELOCATE FACILITIES. INSTALL 1500 FEET OF 2 INCH AND 1200 FEET OF 4 INCH POLY AND ABANDON 1500 FEET OF 2INCH AND 1200 FEET OF 4 INCH STEEL ALONG HAWTHORNE TO ACCOMMODATE THE CITY OF PLANO ALLEY RECONDITIONING PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES OCTOBER 1752 080.62812 82 INSTALL 720 FEET OF 8 INCH AND 45 FEET OF 2 INCH POLY ALONG ROOSEVELT AND ABANDON 720 FEET OF 8 INCH AND 45 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 1753 080.62819 2,293 RELOCATE FACILITIES. INSTALL 1087 FEET OF 2 INCH POLY AND ABANDON 203 FEET OF 2 INCH STEEL AND 73 FEET OF 2 INCH POLY AND 351 FEET OF 3 INCH STEEL AND 738 FEET OF 3 INCH POLY ALONG NORTHWEST 2ND STREET TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES OCTOBER 1754 080.62824 0 RELOCATE FACILITIES. ABANDON 35 FEET OF 4 INCH STEEL ALONG MILLER AVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES SEPTEMBER 1755 080.62829 7,071 INSTALL 1750 FEET OF 8 INCH POLY AND ABANDON 1750 FEET OF 8 INCH STEEL ALONG LEDBETTER DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1756 080.62833 6,012 INSTALL 240 FEET OF 12 INCH AND 75 FEET OF 4 INCH POLY ALONG E CLARENDON DR AND ABANDON 210 FEET OF 12 INCH AND 25 FEET OF 10 INCH STEEL AND 50 FEET OF 4 INCH POLY AND 650 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1757 080.62834 942 RELOCATE FACILITIES. INSTALL 308 FEET OF 4 INCH POLY ALONG SOUTHWEST PARKWAY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1758 080.62838 3,224 INSTALL 2501 FEET OF 2 INCH POLY AND ABANDON 2485 FEET OF 2 INCH STEEL ALONG SATURN SPRINGS DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 1759 080.62842 3,625 INSTALL 28 FEET OF 2 INCH, 71 FEET OF 4 INCH AND 1597 FEET OF 6 INCH POLY AND ABANDON 1650 FEET OF 6 INCH STEEL AND 125 FEET OF 6 INCH POLY ALONG CHERRY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER 1760 080.62845 6,269 INSTALL 275 FEET OF 4 INCH POLY AND 1622 FEET OF 6 INCH POLY AND ABANDON 100 FEET OF 3 INCH STEEL AND 1829 FEET OF 6 INCH STEEL ALONG BRUTON ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1761 080.62850 11,182 RELOCATE FACILITIES. INSTALL 750 FEET OF 4 INCH POLY AND ABANDON 650 FEET OF 3 INCH POLY AND 100 FEET OF 4 INCH STEEL ALONG KROGER DRIVE TO ACCOMODATECITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1762 080.62866 16 RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY ALONG 9TH STREET AND ABANDON 100 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER MTX Additions Page 56 of 178 275 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1763 080.62870 1,912 INSTALL 1530 FEET OF 4 INCH AND 220 FEET OF 4 INCH POLY AND ABANDON 730 FEET OF 4 INCH, 471 FEET OF 3 INCH, 160 FEET OF 2 INCH STEEL AND 60 FEET OF 2 INCH POLY ALONG WOODLAWN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER 1764 080.62878 27,424 INSTALL 1020 FEET OF 2 INCH POLY ALONG LAKESIDE DRIVE AND ABANDON 1010 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 1765 080.62890 1,349 INSTALL 398 FEET OF 2 INCH POLY AND 700 FEET OF 4 INCH POLY AND ABANDON 496 FEET OF 2 INCH STEEL AND 28 FEET OF 2 INCH POLY AND 672 FEET OF 4 INCH STEEL ALONG LOOP 286 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER 1766 080.62893 33 RELOCATE FACILITIES. INSTALL 325 FEET FEET OF 4 INCH POLY ALONG HIGH SCHOOL DRIVE STREET AND ABANDON 325 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE RELOCATION OF FACILITIES OCTOBER 1767 080.62904 122 INSTALL 382 FEET OF 4 INCH POLY ALONG AVENUE B AND ABANDON 382 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER 1768 080.62917 1,545 RELOCATE FACILITIES. INSTALL 1376 FEET OF 2 INCH POLY AND 3 FEET OF 3 INCH POLY AND ABANDON 111 FEET OF 2 INCH POLY AND 1194 FEET OF 3 INCH STEELALONG 17TH STREET TO ACCOMMODATE CITY OF PARIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS RELOCATION OF FACILITIES OCTOBER 1769 080.62930 4 ABANDON 348 FEET OF 2 INCH POLY ALONG STREETS OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1770 080.62950 9,900 INSTALL 200 FEET OF 20 INCH STEEL ALONG BELTLINE AND ABANDON 190 FEET OF 20 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SUNNYVALE SYSTEM INTEGRITY OCTOBER 1771 080.62952 192 RELOCATE FACILITIES. INSTALL 1100 FEET OF 2 INCH POLY ALONG WEST FRONT AND ABANDON 1090 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE RELOCATION OF FACILITIES OCTOBER 1772 080.62956 40,784 INSTALL 2600 FEET OF 12 INCH AND 6250 FEET OF 2 INCH POLY ALONG NORTHWEST HIGHWAY AND ABANDON 260 FEET OF 12 INCH, 5540 FEET OF 6 INCH, 3335 FEET OF 2 INCH, 105 FEET OF 3 INCH STEEL, 525 FEET OF 6 INCH, 1050 FEET OF 1.25 INCH, 2655 FEET OF 2 INCH, 875 FEET OF 3 INCH AND 295 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1773 080.62957 766 INSTALL 802 FEET OF 2 INCH POLY AND ABANDON 791 FEET OF 2 INCH STEEL ALONG BLANTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHICO SYSTEM INTEGRITY OCTOBER 1774 080.62962 499 INSTALL 548 FEET OF 2 INCH POLY AND ABANDON 313 FEET OF 2 INCH STEEL AND 461 FEET OF 3 INCH STEEL ALONG BUTLER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY OCTOBER 1775 080.62980 5,111 INSTALL DISTRICT REGULATOR STATION AND 158 FEET OF 6 INCH POLY, 15 FEET OF 6 INCH AND 41 FEET OF 8 INCH STEEL AND ABANDON 3 DISTRICT REGULATOR STATION AND 36 FEET OF 2 INCH AND 142 FEET OF 4 INCH STEEL ALONG THE STREETS OF BURLESON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY OCTOBER 1776 080.62991 169 RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH POLY ALONG CHERRYWOOD COURT AND ABANDON 350 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 1777 080.63002 572 RELOCATE FACILITIES. INSTALL 480 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY ALONG SHADY OAK ROAD AND ABANDON 480 FEET OF 4 INCH STEEL AND 10 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF KEENE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEENE RELOCATION OF FACILITIES OCTOBER 1778 080.63010 222 RELOCATE FACILITIES. INSTALL 25 FEET OF 2 INCH POLY AND 14 FEET OF 6 INCH POLY AND ABANDON 10 FEET OF 2 INCH POLY AND 9 FEET OF 6 INCH POLY ALONG YALE BOULEVARD TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES OCTOBER 1779 080.63011 242 INSTALL DISTRICT REGULATOR STATION ALONG HARRISON STREET AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELLMEAD SYSTEM INTEGRITY OCTOBER 1780 080.63015 22 INSTALL 340 FEET OF 2 INCH POLY ALONG EMMETT STREET AND ABANDON 335 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 1781 080.63016 5,987 INSTALL 4634 FEET OF 2 INCH AND 595 FEET OF 4 INCH POLY AND ABANDON 1993 FEET OF 4 INCH STEEL AND 160 FEET OF 3 INCH AND 1830 FEET OF 4 INCH POLY ALONG HUBBARD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER 1782 080.63028 1,729 RELOCATE FACILITIES. INSTALL 795 FEET OF 2 INCH POLY ALONG TRIUMPH AND ABANDON 795 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FOREST HILL WATER LINE PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL RELOCATION OF FACILITIES OCTOBER 1783 080.63033 1,061 RELOCATE FACILITIES. INSTALL 761 FEET OF 4 INCH POLY ALONG OAKMONT AND ABANDON 620 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF ROUND ROCK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK RELOCATION OF FACILITIES OCTOBER 1784 080.63038 (5,357) INSTALL CP TEST STATION AND REMOTE MONITORING UNIT ALONG SUMMER CREEK DRIVE. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY APRIL 1785 080.63043 2,324 INSTALL 2000 FEET OF 2 INCH POLY ALONG BLOSSOM AND ABANDON 1980 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF GARLAND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 1786 080.63045 82 INSTALL 360 FEET OF 4 INCH POLY ALONG N AVENUE AND ABANDON 360 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY SYSTEM INTEGRITY OCTOBER 1787 080.63048 536 INSTALL 672 FEET OF 2 INCH POLY AND ABANDON 739 FEET OF 4 INCH STEEL AND 674 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY OCTOBER 1788 080.63049 2,703 INSTALL 4 FEET OF 4 INCH POLY AND 416 FEET OF 6 INCH POLY AND ABANDON 396 FEET OF 3 INCH STEEL AND 4 FEET OF 4 INCH POLY ALONG FM HWY 121 AND 3RD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GUNTER SYSTEM INTEGRITY OCTOBER 1789 080.63053 5 RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG HILLSDALE DRIVE AND ABANDON 80 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF FLOWERMOUND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND RELOCATION OF FACILITIES OCTOBER 1790 080.63065 963 RELOCATE FACILITIES. INSTALL 567 FEET OF 2 INCH POLY AND ABANDON 642 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF HALTOM CITY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY RELOCATION OF FACILITIES OCTOBER 1791 080.63069 5,857 RELOCATE FACILITIES. INSTALL 616 FEET OF 2 INCH POLY AND 258 FEET OF 4 INCH POLY AND 698 FEET OF 6 INCH POLY AND ABANDON 888 FEET OF 2 INCH STEEL AND 90 FEET OF 2 INCH POLY AND 61 FEET OF 3 INCH STEEL AND 525 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF KAUFMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN RELOCATION OF FACILITIES OCTOBER 1792 080.63080 6,350 INSTALL 1035 FEET OF 8 INCH STEEL ALONG CHRISTOVAL ROAD AND ABANDON 1035 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 1793 080.63090 251 RELOCATE FACILITIES. INSTALL 270 FEET OF 2 INCH POLY ALONG 823 FLAMINGO AND ABANDON 260 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DUNCANVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE RELOCATION OF FACILITIES OCTOBER MTX Additions Page 57 of 178 276 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1794 080.63091 1,837 INSTALL 1000 FEET OF 2 INCH POLY AND ABANDON 999 FEET OF 3 INCH STEEL ALONG AUSTIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEONARD SYSTEM INTEGRITY OCTOBER 1795 080.63092 239 INSTALL 359 FEET OF 2 INCH POLY AND ABANDON 479 FEET OF 2 INCH STEEL ALONG WEST WILLIAM IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 1796 080.63097 5,541 INSTALL 4330 FEET OF 2 INCH POLY ALONG THE STREETS OF THE FIFTH PHASE OF THE AVERY POINTE SUBDIVISION. RESIDENTIAL ANNA GROWTH SEPTEMBER 1797 080.63100 4 ABANDON DISTRICT REGULATOR 1 IN ALBANY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY SYSTEM INTEGRITY SEPTEMBER 1798 080.63109 33 ABANDON 387 FEET OF 4 INCH CAST IRON ALONG 7TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 1799 080.63112 269 RELOCATE FACILITIES. INSTALL 24 FEET OF 6 INCH POLY ALONG JOHN W. ELLIOTT STREET AND ABANDON 24 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF FRISCO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO RELOCATION OF FACILITIES OCTOBER 1800 080.63113 3,647 RELOCATE FACILITIES. INSTALL 20 FEET OF 2 INCH POLY AND 1430 FEET OF 6 INCH POLY AND ABANDON 18 FEET OF 2 INCH POLY AND 1405 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES OCTOBER 1801 080.63135 132,233 RELOCATE FACILITIES. INSTALL 4109 FEET OF 2 INCH POLY AND 31 FEET OF 3 INCH POLY AND 182 FEET OF 4 INCH POLY AND 3695 FEET OF 6 INCH POLY AND ABANDON 522 FEET OF 1.25 INCH POLY AND 368 FEET OF 2 INCH STEEL AND 1610 FEET OF 2 INCH POLY AND 1649 FEET OF 3 INCH STEEL AND 1934 FEET OF 3 INCH POLY AND 70 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG MAIN AND CIRCLE TO ACCOMMODATE CITY OF KAUFMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN RELOCATION OF FACILITIES OCTOBER 1802 080.63150 205,960 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY VERNON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER 1803 080.63155 35,676 IOWA PARK AREA REPLACEMENTS AS PART OF THE TEXAS RULE 8.209 PROGRAM. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 1804 080.63156 687 RELOCATE FACILITIES. INSTALL 440 FEET OF 6 INCH POLY ALONG WEST BELTLINE ROAD AND ABANDON 440 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF DESOTO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO RELOCATION OF FACILITIES OCTOBER 1805 080.63159 343 INSTALL 40 FEET OF 12 INCH STEEL ALONG SH 199 AND ABANDON 40 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AZLE SYSTEM INTEGRITY OCTOBER 1806 080.63162 1,161 RELOCATE FACILITIES. INSTALL 1320 FEET OF 4 INCH POLY AND ABANDON 639 FEET OF 4 INCH STEEL AND 46 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF SHERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES OCTOBER 1807 080.63163 1,183 RELOCATE FACILITIES. INSTALL 408 FEET OF 4 INCH POLY AND ABANDON 351 FEET OF 4 INCH STEEL AND 20 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1808 080.63164 1,467 RELOCATE FACILITIES. INSTALL 321 FEET OF 2 INCH POLY AND 350 FEET OF 4 INCH POLY AND ABANDON 110 FEET OF 2 INCH STEEL AND 79 FEET OF 2 INCH POLY AND 316 FEET OF 3 INCH STEEL AND 17 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF WACO HERRING AVE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 1809 080.63170 2 RELOCATE FACILITIES. ABANDON 123 FEET OF 3 INCH POLY ALONG GRAND AVENUE PARKWAY TO ACCOMMODATE THE CITY OF AUSTIN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AUSTIN RELOCATION OF FACILITIES SEPTEMBER 1810 080.63172 1,743 INSTALL DISTRICT REGULATOR STATION 01 ALONG PINE STREET AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABBOTT SYSTEM INTEGRITY OCTOBER 1811 080.63177 886 RELOCATE FACILITIES. INSTALL 320 FEET OF 2 INCH POLY ALOG MESQUITE DRIVE AND ABANDON 127 FEET OF 2 INCH STEEL AND 188 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE RELOCATION OF FACILITIES OCTOBER 1812 080.63180 2,530 INSTALL 1788 FEET OF 4 INCH POLY AND ABANDON 1749 FEET OF 3 INCH STEEL AND 36 FEET OF 2 INCH POLY ALONG AVENUE B IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS LAWN SYSTEM INTEGRITY OCTOBER 1813 080.63191 2,976 INSTALL 25 FEET OF 10 INCH AND 10 FEET OF 8 INCH STEEL ALONG TEASLEY DRIVE AND ABANDON 25 FEET OF 10 INCH AND 10 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER 1814 080.63196 53 RELOCATE FACILITIES. INSTALL 55 FEET OF 2 INCH POLY AND ABANDON 36 FEET OF 2 INCH POLY ALONG WESTVIEW TO ACCOMMODATE CITY OF ROWLETT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT RELOCATION OF FACILITIES OCTOBER 1815 080.63198 910 INSTALL 21 FEET OF 2 INCH POLY AND 328 FEET OF 4 INCH POLY AND ABANDON 2 FEET OF 2 INCH STEEL AND 289 FEET OF 4 INCH STEEL AND 34 FEET OF 4 INCH POLY ALONG TRINTIY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY OCTOBER 1816 080.63206 1,010 INSTALL 625 FEET OF 2 INCH POLY AND ABANDON 1967 FEET OF 2 INCH STEEL AND 128 FEET OF 2 INCH POLY ALONG PINE STREET IN CLYDE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS CLYDE SYSTEM INTEGRITY OCTOBER 1817 080.63207 2,365 INSTALL 420 FEET OF 4 INCH POLY AND 760 FEET OF 2 INCH POLY ALONG US HIGHWAY 377. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL GRANBURY GROWTH SEPTEMBER 1818 080.63212 8,136 INSTALL 5 FEET OF 12 INCH STEEL AND 14 FEET OF 16 INCH STEEL AND ABANDON 19 FEET OF 12 INCH STEEL AND 18 FEET OF 16 INCH STEEL ALONG DAGGETT AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1819 080.63213 11,279 INSTALL 5 FEET OF 4 INCH POLY AND 7 FEET OF 6 INCH POLY AND 25 FEET OF 8 INCH POLY AND 983 FEET OF 12 INCH POLY ALONG LANCASTER ROAD AND ABANDON 440 FEET OF 6 INCH STEEL AND 7 FEET OF 6 INCH POLY AND 1127 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1820 080.63216 123,925 RELOCATE FACILITIES. INSTALL 455 FEET OF 2 INCH POLY AND 2292 FEET OF 4 INCH POLY AND ABANDON 465 FEET OF 2 INCH STEEL, 257 FEET OF 4 INCH STEEL AND 619 FEET OF 4 INCH POLY TO ACCOMMODATE TXDOT RELOCATION PROJECT IN ACCORDANCE WITH TEXAS RULE 8.209. ALL CUSTOMERS SPRINGTOWN RELOCATION OF FACILITIES OCTOBER 1821 080.63217 807 INSTALL 797 FEET OF 2 INCH POLY AND ABANDON 388 FEET OF 2 INCH STEEL AND 182 FEET OF 2 INCH POLY ALONG AVENUE P IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON SYSTEM INTEGRITY OCTOBER 1822 080.63222 3,647 RELOCATE FACILITIES. INSTALL 1337 FEET OF 2 INCH POLY AND 245 FEET OF 4 INCH POLY AND ABANDON 1575 FEET OF 2 INCH STEEL ALONG SCRIPTURE STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1823 080.63232 1,925 INSTALL 104 FEET OF 2 INCH POLY AND 354 FEET OF 4 INCH POLY AND 1500 FEET OF 6 INCH POLY ALONG SPRUCE AVENUE AND ABANDON 1958 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE SYSTEM INTEGRITY OCTOBER 1824 080.63236 1,557 RELOCATE FACILITIES. INSTALL 672 FEET F 4 INCH POLY ALONG BELL AND ABANDON 8 FEET OF 2 INCH POLY AND 592 FEET OF 4 INCH POLY AND 75 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF SAN ANGELO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO RELOCATION OF FACILITIES OCTOBER MTX Additions Page 58 of 178 277 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1825 080.63240 119 RELOCATE FACILITIES. INSTALL 10 FEET OF 3 INCH POLY AND ABANDON 5 FEET OF 3 INCH POLY ALONG MCDANIEL TO ACCOMMODATE CITY OF CARROLLTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON RELOCATION OF FACILITIES OCTOBER 1826 080.63241 1,906 INSTALL 2760 FEET OF 4 INCH POLY AND ABANDON 1958 FEET OF 4 INCH STEEL ALONG WALNUT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE SYSTEM INTEGRITY OCTOBER 1827 080.63242 2,040 RELOCATE FACILITIES. INSTALL 940 FEET OF 4 INCH POLY ALONG WYNNEWOOD DRIVE AND ABANDON 335 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 1828 080.63251 17,062 RELOCATE FACILITIES. INSTALL 495 FEET OF 2 INCH POLY AND 172 FEET OF 4 INCH POLY AND 1079 FEET OF 6 INCH POLY AND ABANDON 679 FEET OF 2 INCH STEEL AND 875 FEET OF 4 INCH STEEL AND 136 FEET OF 6 INCH POLY ALONG MAIN STREET TO ACCOMMODATE CITY OF CROWLEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY RELOCATION OF FACILITIES OCTOBER 1829 080.63255 11 ABANDON DISTRICT REGULATOR STATION 132 ALONG WEST COLORADO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1830 080.63256 1,544 RELOCATE FACILITIES. INSTALL (33) POLY SERVICES AND ABANDON (33) STEEL SERVICES ALONG MILDRED LANE TO ACCOMMODATE CITY OF BENBROOK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK RELOCATION OF FACILITIES OCTOBER 1831 080.63257 5 ABANDON DISTRICT REGULATOR STATION 10 IN COMANCHE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY SEPTEMBER 1832 080.63271 1,515 INSTALL 3 FEET OF 2 INCH POLY AND 1426 FEET OF 4 INCH POLY AND ABANDON 426 FEET OF 2 INCH POLY AND 1581 FEET OF 4 INCH STEEL AND 382 FEET OF 4 INCH POLY ALONG BOWIE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANTA ANNA SYSTEM INTEGRITY OCTOBER 1833 080.63279 3,835 INSTALL 544 FEET OF 2 INCH POLY AND 9 FEET OF 3 INCH POLY AND 30 FEET OF 4 INCH POLY AND 1451 FEET OF 6 INCH POLY ALONG BROADWAY STREET AND ABANDON 1376 FEET OF 3 INCH STEEL AND 10 FEET OF 4 INCH STEEL AND 779 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER 1834 080.63284 6,156 INSTALL 2930 FEET OF 4 INCH POLY ALONG EAST TEXAS AVENUE AND ABANDON 800 FEET OF 3 INCH AND 1950 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER 1835 080.63298 3,808 RELOCATE FACILITIES. INSTALL 420 FEET OF 8 INCH POLY ALONG LAMAR AND ABANDON 415 FEET OF 8 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 1836 080.63300 876 INSTALL 880 FEET OF 4 INCH POLY ALONG NORTH BECKLEY AND ABANDON 878 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY OCTOBER 1837 080.63309 30,412 INSTALL 791 FEET OF 8 INCH, 1632 FEET OF 6 INCH, 314 FEET OF 4 INCH AND 3492 FEET OF 2 INCH POLY ALONG THE STREETS OF BAR W RANCH PHASE 1 SECTION 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH FEBRUARY 1838 080.63312 14,486 INSTALL POLY SERVICES AND ABANDON STEEL SERVICES ALONG STREETS IN CITY OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1839 080.63321 1,636 RELOCATE FACILITIES. INSTALL 1120 FEET OF 4 INCH POLY ALONG ROYAL STREET ABANDON 1000 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF WAXAHACHIE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE RELOCATION OF FACILITIES OCTOBER 1840 080.63326 13,129 RELOCATE FACILITIES. INSTALL 93 FEET OF 2 INCH POLY AND 260 FEET OF 4 INCH POLY AND 4967 FEET OF 8 INCH POLY AND ABANDON 93 FEET OF 2 INCH POLY AND 146 FEET OF 4 INCH POLY AND 4734 FEET OF 8 INCH POLY ALONG SKYLINE AND SH80 TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE RELOCATION OF FACILITIES OCTOBER 1841 080.63331 11,073 INSTALL 4500 FEET OF 4 INCH AND 2100 FEET OF 2 INCH POLY ALONG MARKET STREET AND ABANDON 2 FEET OF 2 INCH STEEL AND 249 FEET OF 2 INCH POLY AND 3210 FEET OF 3 INCH STEEL AND 188 FEET OF 3 INCH POLY AND 2289 FEET OF 4 INCH STEEL AND 572 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MABANK SYSTEM INTEGRITY OCTOBER 1842 080.63336 2,315 RELOCATE FACILITIES. INSTALL 600 FEET OF 4 INCH POLY ALONG HUNT AND PECAN AND ABANDON 540 FEET OF 6 INCH STEEL AND 60 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF RANGER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER RELOCATION OF FACILITIES OCTOBER 1843 080.63337 4,615 INSTALL 291 FEET OF 2 INCH POLY AND 2331 FEET OF 4 INCH POLY AND 738 FEET OF 6 INCH POLY AND 8 FEET OF 12 INCH STEEL AND ABANDON 384 FEET OF 2 INCH STEEL AND 181 FEET OF 2 INCH POLY AND 587 FEET OF 4 INCH STEEL AND 2569 FEET OF 6 INCH STEEL AND 17 FEET OF 6 INCH POLY AND 370 FEET OF 8 INCH STEEL AND 8 FEET OF 12 INCH STEEL ALONG BRIDWELL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 1844 080.63352 2,783 INSTALL 1057 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK PHASE 6. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER 1845 080.63363 499 RELOCATE FACILITIES. INSTALL 510 FEET OF 4 INCH POLY ALONG OLD AUSTIN PFLUGERVILLE ROAD AND ABANDON 517 FEET OF 3 INCH AND 59 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF PFLUGERVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PFLUGERVILLE RELOCATION OF FACILITIES OCTOBER 1846 080.63368 41 RELOCATE FACILITIES. INSTALL 68 FEET OF 2 INCH POLY ALONG VALLEY DRIVE AND ABANDON 62 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF KERRVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES OCTOBER 1847 080.63379 19,203 RELOCATE FACILITIES. INSTALL 796 FEET OF 6 INCH POLY AND ABANDON 677 FEET OF 4 INCH POLY AND 257 FEET OF 6 INCH POLY ALONG MCDONWELL SCHOOL ROAD TO ACCOMMODATE CITY OF COLLEYVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE RELOCATION OF FACILITIES OCTOBER 1848 080.63381 5,916 INSTALL 2000 FEET OF 2 INCH AND 324 FEET OF 4 INCH POLY ALONG GARTH AND ABANDON 1757 FEET OF 2 INCH STEEL AND 303 FEET OF 3 INCH STEEL AND 324 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KILLEEN SYSTEM INTEGRITY OCTOBER 1849 080.63389 1,353 INSTALL 740 FEET OF 2 INCH POLY ALONG CLARE STREET AND ABANDON 1500 FEET OF 2 INCH OTHER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 1850 080.63394 1,025 RELOCATE FACILITIES. INSTALL 975 FEET OF 2 INCH POLY ALONG SHORECREST DRIVE AND ABANDON 965 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF ROWLETT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT RELOCATION OF FACILITIES OCTOBER 1851 080.63398 545 INSTALL 920 FEET OF 2 INCH POLY ALONG EAST ELLISON STREET AND ABANDON 650 FEET OF 4 INCH STEEL AND 275 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY OCTOBER 1852 080.63404 470 INSTALL DISTRICT REGULATOR STATION IN BROOKSTON AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROOKSTON SYSTEM INTEGRITY OCTOBER 1853 080.63408 406 RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH AND 250 FEET OF 2 INCH POLY ALONG BUFFORD STREET ABANDON 250 FEET OF 2 INCH POLY AND 175 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF BURLESON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON RELOCATION OF FACILITIES OCTOBER 1854 080.63414 5,750 RELOCATE FACILITIES. INSTALL 645 FEET OF 2 INCH POLY ALONG MICHIGAN AVENUE AND ABANDON 1000 FEET OF 6 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER MTX Additions Page 59 of 178 278 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1855 080.63428 2,061 RELOCATE FACILITIES. INSTALL 1540 FEET OF 2 INCH POLY ALONG WESTWOOD DRIVE AND ABANDON 1540 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF IRVING IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 1856 080.63443 145,572 RELOCATE FACILITIES. INSTALL 114 FEET OF 2 INCH, 905 FEET OF 4 INCH AND 4619 FEET OF 6 INCH POLY AND ABANDON 48 FEET OF 2 INCH STEEL AND 38 FEET OF 3 INCH STEEL AND 5346 FEET OF 4 INCH STEEL AND 244 FEET OF 4 INCH POLY ALONG SOUTH COLLINS STREET AND PIONEER PARKWAY.TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 1857 080.63457 1,155 RELOCATE FACILITIES. INSTALL 193 FEET OF 6 INCH POLY ALONG WEST DIVISION AND ABANDON 156 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF ARLINGTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 1858 080.63472 447 RELOCATE FACILITIES. INSTALL 440 FEET OF 2 INCH POLY ALONG JARVIS WAY AND ABANDON 440 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1859 080.63476 40 ABANDON DISTRICT REGULATOR STATION 08 ALONG DAVIS STREET IN WEST, TEXAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST SYSTEM INTEGRITY OCTOBER 1860 080.63477 0 ABANDON DISTRICT REGULATOR STATION 10 IN ALBANY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ALBANY SYSTEM INTEGRITY SEPTEMBER 1861 080.63479 617 ABANDON DISTRICT REGULATOR STATION 19 ALONG CHAMBERS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY OCTOBER 1862 080.63487 6,407 INSTALL 96 FEET OF 18 INCH STEEL AND ABANDON 96 FEET OF 18 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1863 080.63492 824 RELOCATE FACILITIES. INSTALL 411 FEET OF 4 INCH POLY AND ABANDON 20 FEET OF 4 INCH POLY AND 395 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1864 080.63493 374 ABANDON 176 FEET OF 2 INCH POLY AND 244 FEET OF 4 INCH POLY ALONG OVILLA ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RED OAK SYSTEM INTEGRITY OCTOBER 1865 080.63495 4,261 RELOCATE FACILITIES. INSTALL 2786 FEET OF 2 INCH POLY AND ABANDON 1460 FEET OF 2 INCH STEEL AND 5 FEET OF 3 INCH STEEL ALONG OLIVE PLACE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1866 080.63496 867 INSTALL 627 FEET OF 2 INCH POLY AND ABANDON 620 FEET OF 2 INCH STEEL ALONG HILLTOP DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY OCTOBER 1867 080.63503 4,465 INSTALL 53 FEET OF 2 INCH POLY AND 2400 FEET OF 4 INCH POLY AND 315 FEET OF 6 INCH POLY AND ABANDON 54 FEET OF 2 INCH POLY AND 2398 FEET OF 4 INCH POLY AND 310 FEET OF 6 INCH STEEL ALONG JAMESTOWN LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER 1868 080.63507 (2) ABANDON DISTRICT REGULATOR STATION 262 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1869 080.63512 17,680 INSTALL 2041 FEET OF 2 INCH POLY AND 880 FEET OF 4 INCH POLY AND 1287 FEET OF 6 INCH POLY AND ABANDON 2354 FEET OF 3 INCH STEEL AND 677 FEET OF 4 INCH STEEL AND 432 FEET OF 6 INCH STEEL ALONG WEST 28TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 1870 080.63514 2,015 INSTALL 1600 FEET OF 2 INCH POLY ALONG TRAVIS AVENUE AND ABANDON 1570 FEET OF 4 INCH STEEL AND 380 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1871 080.63517 79 INSTALL RELIEF VALVE AND ABANDON RELIEF VALVE ALONG DISTRICT REGULATOR 1 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MOODY SYSTEM INTEGRITY OCTOBER 1872 080.63519 1,126 RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY AND ABANDON 500 FEET OF 2 INCH STEEL AND 20 FEET OF 2 INCH POLY ALONG HOLLAND STREET TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES OCTOBER 1873 080.63525 (37) ABANDON DISTRICT REGULATOR STATION 274 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1874 080.63531 1,025 INSTALL 301 FEET OF 4 INCH POLY AND 80 FEET OF 8 INCH STEEL AND 60 FEET OF 2 INCH POLY ALONG HOUSTON AND ABANDON 290 FEET OF 4 INCH AND 50 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROYSE CITY SYSTEM INTEGRITY OCTOBER 1875 080.63533 7,527 RELOCATE FACILITIES. INSTALL 57 FEET OF 2 INCH POLY AND 2811 FEET OF 4 INCH POLY AND ABANDON 1695 FEET OF 2 INCH STEEL AND 46 FEET OF 2 INCH POLY AND 1120 FEET OF 4 INCH STEEL AND 5 FEET OF 4 INCH POLY ALONG TEXT BOULEVARD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1876 080.63544 4,971 RELOCATE FACILITIES. INSTALL 11 FEET OF 2 INCH POLY AND 6 FEET OF 3 INCH POLY AND 937 FEET OF 4 INCH POLY AND 420 FEET OF 8 INCH POLY AND ABANDON 11 FEET OF 2 INCH POLY AND 300 FEET OF 3 INCH STEEL AND 3 FEET OF 3 INCH POLY AND 470 FEET OF 6 INCH STEEL AND 398 FEET OF 8 INCH STEEL ALONG VICKI STREET TO ACCOMMODATE CITY OF HALTOM CITY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY RELOCATION OF FACILITIES OCTOBER 1877 080.63546 4,158 RELOCATE FACILITIES. INSTALL 598 FEET OF 6 INCH POLY AND ABANDON 598 FEET OF 6 INCH STEEL ALONG PLANO PARKWAY TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES OCTOBER 1878 080.63547 28 RELOCATE FACILITIES. INSTALL 150 FEET OF 2 INCH POLY ALONG METHVIN STREET AND ABANDON 253 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW RELOCATION OF FACILITIES OCTOBER 1879 080.63548 2,239 RELOCATE FACILITIES. INSTALL 10 FEET OF 2 INCH POLY AND 935 FEET OF 4 INCH POLY AND ABANDON 8 FEET OF 2 INCH POLY AND 9 FEET OF 4 INCH POLY ALONG MARYS LANE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1880 080.63553 (35) ABANDON DISTRICT REGULATOR STATION 9 IN BALLINGER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY OCTOBER 1881 080.63557 272 ABANDON 445 FEET OF 3 INCH STEEL ALONG SYCAMORE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY OCTOBER 1882 080.63570 0 ABANDON DISTRICT REGULATOR STATION(S) 131 ALONG KINGS HIGHWAY AND EDGEFIELD AVENUE IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1883 080.63574 2,807 INSTALL 2786 FEET OF 2 INCH POLY AND 1009 FEET OF 4 INCH POLY AND ABANDON 103 FEET OF 2 INCH POLY AND 353 FEET OF 3 INCH POLY AND 2505 FEET OF 4 INCH STEEL ALONG COLBERT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER 1884 080.63581 1,684 RELOCATE FACILITIES. INSTALL 1020 FEET 4 INCH POLY ALONG ARMSTRONG AND ABANDON 907 FEET OF 4 INCH STEEL AND 110 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 1885 080.63586 3,960 RELOCATE FACILITIES. INSTALL 2535 FEET OF 2 INCH POLY AND 125 FEET OF 4 INCH POLY AND ABANDON 2411 FEET OF 2 INCH STEEL AND 24 FEET OF 2 INCH POLY AND 83 FEET OF 4 INCH STEEL ALONG NORTH 25TH STREET TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER MTX Additions Page 60 of 178 279 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1886 080.63588 430 RELOCATE FACILITIES. INSTALL 78 FEET OF 4 INCH POLY AND ABANDON 83 FEET OF 4 INCH STEEL ALONG NORTH 25TH STREET TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 1887 080.63589 3,279 INSTALL 1360 FEET OF 2 INCH POLY AND 365 FEET OF 4 INCH POLY AND ABANDON 200 FEET OF 6 INCH STEEL AND 1520 FEET OF 4 INCH STEEL AND 111 FEET OF 3 INCH STEEL ALONG WEST 4TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER 1888 080.63590 926 RELOCATE FACILITIES. INSTALL 150 FEET OF 6 INCH POLY AND ABANDON 150 FEET OF 6 INCH STEEL ALONG BOSQUE AT WOODED ACRES TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 1889 080.63594 2 ABANDON DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURKBURNETT SYSTEM INTEGRITY SEPTEMBER 1890 080.63603 2,657 INSTALL 1112 FEET OF 4 INCH POLY AND ABANDON 961 FEET OF 4 INCH STEEL AND 146 FEET OF 4 INCH POLY AND 21 FEET OF 6 INCH STEEL ALONG MOSS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND SYSTEM INTEGRITY OCTOBER 1891 080.63606 1,939 ABANDON 20 FEET OF 6 INCH STEEL AND 66 FEET OF 12 INCH STEEL ALONG NEWMORE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1892 080.63607 5,106 RELOCATE FACILITIES. INSTALL 840 FEET OF 4 INCH POLY AND ABANDON 246 FEET OF 2 INCH STEEL AND 20 FEET OF 2 INCH POLY AND 130 FEET OF 3 INCH POLY AND 34 FEET OF 4 INCH STEEL AND 305 FEET OF 4 INCH POLY ALONG LEE STREET TO ACCOMMODATE CITY OF GREENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE RELOCATION OF FACILITIES OCTOBER 1893 080.63608 739 INSTALL 588 FEET OF 2 INCH POLY AND ABANDON 586 FEET OF 2 INCH STEEL ALONG SAN CARLOS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER 1894 080.63609 484 INSTALL GROUNDBED AND RECTIFIER AND ABANDON GROUNDBED AND RECTIFIER ON LINE O1 IN DALLAS COUNTY TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY OCTOBER 1895 080.63610 793 INSTALL RECTIFIER AND GROUND BED AND ABANDON RECTIFIER AND GROUND BED IN GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 1896 080.63615 1,490 RELOCATE FACILITIES. INSTALL 928 FEET OF 2 INCH POLY AND 3 FEET OF 3 INCH POLY AND ABANDON 803 FEET OF 3 INCH STEEL ALONG GARLAND AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1897 080.63616 2,596 INSTALL 1288 FEET OF 2 INCH POLY AND ABANDON 8 FEET OF 4 INCH POLY ALONG LIPSCOMB STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1898 080.63625 335 RELOCATE FACILITIES. INSTALL 215 FEET OF 4 INCH POLY AND ABANDON 215 FEET OF 3 INCH POLY ALONG WEST 6TH STREET TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA RELOCATION OF FACILITIES OCTOBER 1899 080.63632 5,270 RELOCATE FACILITIES. INSTALL 643 FEET OF 2 INCH AND 2 FEET OF 3 INCH AND 3808 FEET OF 4 INCH POLY AND ABANDON 334 FEET OF 2 INCH STEEL AND 572 FEET OF 2 INCH POLY AND 367 FEET OF 3 INCH STEEL AND 2521 FEET OF 4 INCH STEEL AND 265 FEET OF 4 INCH POLY AND 1195 FEET OF 6 INCH STEEL AND 73 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF SULPHUR SPRINGS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS RELOCATION OF FACILITIES OCTOBER 1900 080.63644 183,449 INSTALL 9504 FEET OF 10 INCH STEEL ALONG ALONG NORTH AIRFIELD DRIVE AND ABANDON 8500 FEET OF 10 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER 1901 080.63646 (0) INSTALL 2,400 FEET OF 4 INCH POLY AND 4,800 FEET OF 2 INCH POLY ALONG THE STREETS IN THE NEW CRESCENT HEIGHTS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SOUTHLAKE GROWTH JANUARY 1902 080.63647 897 INSTALL 594 FEET OF 2 INCH POLY AND ABANDON 460 FEET OF 2 INCH STEEL AND 65 FEET OF 2 INCH POLY ALONG REED STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HONEY GROVE SYSTEM INTEGRITY OCTOBER 1903 080.63653 2,086 INSTALL 1325 FEET OF 2 INCH POLY ALONG HEARON STREET AND ABANDON 781 FEET OF 2 INCH STEEL AND 106 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER 1904 080.63655 36 ABANDON DISTRICT REGULATOR STATION 01 ALONG WILBARGER AND 12TH IN VERNON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER 1905 080.63674 842 INSTALL 464 FEET OF 2 INCH POLY ALONG LOOP 561 AND ABANDON 598 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO SYSTEM INTEGRITY OCTOBER 1906 080.63677 784 RELOCATE FACILITIES. INSTALL 1062 FEET OF 2 INCH POLY AND ABANDON 187 FEET OF 2 INCH STEEL AND 546 FEET OF 3 INCH STEEL AND 20 FEET OF 4 INCH STEEL ALONG CULBERSON STREET TO ACCOMMODATE CITY OF GAINESVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE RELOCATION OF FACILITIES OCTOBER 1907 080.63679 1,423 RELOCATE FACILITIES. INSTALL 1435 FEET OF 2 INCH POLY ALONG WOODBRIDGE ROAD AND ABANDON 493 FEET OF 2 INCH STEEL AND 2167 FEET OF 2 INCH POLY AND 175 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL RELOCATION OF FACILITIES OCTOBER 1908 080.63680 598 RELOCATE FACILITIES. INSTALL 74 FEET OF 2 INCH POLY AND 51 FEET OF 4 INCH POLY AND ABANDON 58 FEET OF 2 INCH POLY AND 7 FEET OF 4 INCH POLY ALONG WACO STREET TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 1909 080.63698 7 ABANDON DISTRICT REGULATOR STATION 163 AT BOWIE AND GORDON IN FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1910 080.63700 1,807 RELOCATE FACILITIES. INSTALL 1249 FEET OF 2 INCH POLY ALONG CRIPPLE CREEK AND ABANDON 1249 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 1911 080.63701 3,957 RELOCATE FACILITIES. INSTALL 2626 FEET OF 2 INCH POLY AND ABANDON 500 FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY AND 1600 FEET OF 3 INCH POLY AND 260 FEET OF 4 INCH STEEL ALONG SUNNYBROOK TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 1912 080.63702 17,952 RELOCATE FACILITIES. INSTALL 3404 FEET OF 2 INCH POLY AND ABANDON 3304 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY ALONG GREENOAKS TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 1913 080.63703 24,196 RELOCATE FACILITIES. INSTALL 1620 FEET OF 2 INCH POLY ALONG OAK MEADOW AND ABANDON 1620 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF IRVING IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 1914 080.63704 11,178 RELOCATE FACILITIES. INSTALL 49 FEET OF 2 INCH POLY AND 10 FEET OF 3 INCH POLY AND 1152 FEET OF 4 INCH POLY ALONG WILLIAM BREWSTER AND ABANDON 49 FEET OF 2 INCH STEEL AND 10 FEET OF 3 INCH STEEL AND 1152 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER MTX Additions Page 61 of 178 280 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1915 080.63705 2,219 RELOCATE FACILITIES. INSTALL 553 FEET OF 4 INCH POLY AND ABANDON 315 FEET OF 3 INCH POLY ALONG PURITAN DRIVE TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 1916 080.63712 830 RELOCATE FACILITIES. INSTALL 230 FEET OF 2 INCH POLY AND ABANDON 75 FEET OF 2 INCH POLY ALONG PEACHTREE TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES OCTOBER 1917 080.63715 2,055 INSTALL 2404 FEET OF 2 INCH POLY ALONG FARM TO MARKET ROAD 308 AND ABANDON 650 FEET OF 2 INCH STEEL AND 454 FEET OF 2 INCH POLY AND 755 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PENELOPE SYSTEM INTEGRITY OCTOBER 1918 080.63717 795 INSTALL 1300 FEET OF 2 INCH POLY ALONG EASTERN STAR AND ABANDON 1290 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 1919 080.63750 384 INSTALL 500 FEET OF 4 INCH POLY AND ABANDON 480 FEET OF 4 INCH STEEL 10 FEET OF 4 INCH POLY ALONG CADDO STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY OCTOBER 1920 080.63751 4,956 INSTALL 1376 FEET OF 4 INCH POLY AND ABANDON 630 FEET OF 4 INCH STEEL AND 426 FEET OF 4 INCH POLY ALONG TAYLOR STREET AND WASHINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY OCTOBER 1921 080.63752 102 INSTALL RELIEF VALVE AND AND ABANDON RELIEF VALVE AT AUSTIN COLLEGE IN SHERMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER 1922 080.63753 35 ABANDON 270 FEET OF 2 INCH STEEL ALONG MARTIN LUTHER KING ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER 1923 080.63754 170 ABANDON 675 FEET OF 2 INCH STEEL ALONG GOODE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUITMAN SYSTEM INTEGRITY OCTOBER 1924 080.63768 4 ABANDON DISTRICT REGULATOR STATION 02 ALONG COMANCHE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY SEPTEMBER 1925 080.63769 2,932 INSTALL 704 FEET OF 4 INCH STEEL AND ABANDON 683 FEET OF 4 INCH STEEL ALONG US HIGHWAY 84 EAST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GOLDTHWAITE SYSTEM INTEGRITY OCTOBER 1926 080.63770 6,953 RELOCATE FACILITIES. INSTALL 475 FEET OF 2 INCH POLY AND 15 FEET OF 3 INCH POLY AND 3168 FEET OF 4 INCH POLY AND ABANDON 297 FEET OF 2 INCH STEEL AND 6 FEET OF 2 INCH POLY AND 1120 FEET OF 3 INCH STEEL AND 152 FEET OF 3 INCH POLY AND 1798 FEET OF 4 INCH STEEL AND 935 FEET OF 4 INCH POLY ALONG SOUTH KERR STREET TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLOOMING GROVE RELOCATION OF FACILITIES OCTOBER 1927 080.63772 3 ABANDON DISTRICT REGULATOR STATION #108 IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1928 080.63780 7 ABANDON DISTRICT REGULATOR STATION 406 ALONG WEILER BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1929 080.63782 398 RELOCATE FACILITIES. INSTALL 150 FEET OF 2 INCH POLY AND ABANDON 140 FEET OF 2 INCH POLY ALONG HIGHWAY 377 AND INTERSTATE 35 TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1930 080.63783 496 RELOCATE FACILITIES. INSTALL 270 FEET OF 4 INCH POLY ALONG PINEWOOD AND ABANDON 170 FEET OF 3 INCH AND 100 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF ARLINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 1931 080.63785 1,213 RELOCATE FACILITIES. INSTALL 190 FEET OF 2 INCH POLY ALONG SOUTHEAST LINGLEVILLE ROAD AND MCCART STREET AND ABANDON 140 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF STEPHENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE RELOCATION OF FACILITIES OCTOBER 1932 080.63788 9,527 RELOCATE FACILITIES. ABANDON 887 FEET OF 2 INCH STEEL AND 35 FEET OF 2 INCH POLY AND 420 FEET OF 3 INCH STEEL ALONG FM2862 TO ACCOMMODATE CITY OF WESTMINSTER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTMINSTER RELOCATION OF FACILITIES OCTOBER 1933 080.63790 1,909 INSTALL 620 FEET OF 4 INCH POLY ALONG BRYAN AVENUE AND ABANDON 98 FEET OF 6 INCH STEEL AND 193 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1934 080.63810 6,132 INSTALL 900 FEET OF 6 INCH POLY FOR NEW COMMERCIAL DEVELOPMENT AT NEW DPS BUILINDG IN DFW AIRPORT EULESS TX. COMMERCIAL OR INDUSTRIAL EULESS GROWTH MARCH 1935 080.63831 92,562 INSTALL 14 FEET OF 2 INCH POLY AND 6375 FEET OF 4 INCH POLY AND ABANDON 147 FEET OF 2 INCH STEEL AND 800 FEET OF 2 INCH POLY AND 3422 FEET OF 3 INCH STEEL AND 774 FEET OF 6 INCH STEEL ALONG KINKAID DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1936 080.63850 1,601 INSTALL 650 FEET OF 2 INCH POLY AND 83 FEET OF 4 INCH POLY ALONG BLOSSOM LANE AND ABANDON 785 FEET OF 2 INCH STEEL AND 63 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1937 080.63852 4,251 INSTALL 2561 FEET OF 2 INCH POLY ALONG BURNSIDE AVENUE AND ABANDON 2240 FEET OF 2 INCH STEEL AND 103 FEET OF 2 INCH POLY AND 130 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1938 080.63863 2,340 RELOCATE FACILITIES. INSTALL 399 FEET OF 2 INCH POLY AND ABANDON 398 FEET OF 2 INCH STEEL ALONG EGAN STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1939 080.63877 8,179 INSTALL 2500 FEET OF 2 INCH POLY AND ABANDON 2450 FEET OF 2 INCH STEEL ALONG NORTH 3RD STREET IN CORSICANA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 1940 080.63878 4,540 INSTALL 81 FEET OF 2 INCH POLY AND 477 FEET OF 4 INCH POLY AND ABANDON 481 FEET OF 2 INCH POLY AND 318 FEET OF 3 INCH STEEL AND 82 FEET OF 3 INCH POLY ALONG HEARNE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 1941 080.63885 2,364 RELOCATE FACILITIES. INSTALL 268 FEET OF 4 INCH POLY AND ABANDON 200 FEET OF 4 INCH STEEL ALONG CEDAR STREET TO ACCOMMODATE CITY OF HEARNE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE RELOCATION OF FACILITIES OCTOBER 1942 080.63889 19 RELOCATE FACILITIES. INSTALL 21 FEET OF 2 INCH POLY ALONG PARK AVENUE AND ABANDON 11 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 1943 080.63901 8,975 RELOCATE FACILITIES. INSTALL 1200 FEET OF 2 INCH POLY ALONG ROLLING RIDGE AND ABANDON 1190 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER 1944 080.63902 1,823 INSTALL 1673 FEET OF 2 INCH POLY ALONG OLD COLONY ROAD AND ABANDON 1237 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1945 080.63904 1,840 RELOCATE FACILITIES. INSTALL 905 FEET OF 4 INCH POLY ALONG CAMPBELL ROAD AND ABANDON 10 FEET OF 4 INCH POLY AND 932 FEET OF 6 INCH STEEL AND 10 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1946 080.63906 355 RELOCATE FACILITIES. INSTALL 201 FEET OF 2 INCH POLY AND ABANDON 60 FEET OF 1.25 INCH POLY ALONG BRADLEY STREET TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES OCTOBER MTX Additions Page 62 of 178 281 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1947 080.63907 58,169 RELOCATE FACILITIES. INSTALL 307 FEET OF 4 INCH POLY AND 3938 FEET OF 6 INCH POLY AND ABANDON 275 FEET OF 4 INCH POLY AND 3880 FEET OF 6 INCH POLY ALONG HICKORY CREEK WEST TO ACCOMMODATE THE CITY OF DENTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 1948 080.63911 8,805 INSTALL 908 FEET OF 2 INCH POLY AND 1161 FEET OF 4 INCH POLY ALONG RIVER BEND DRIVE AND ABANDON 700 FEET OF 2 INCH POLY AND 800 FEET OF 3 INCH POLY AND 340 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER 1949 080.63914 2,364 RELOCATE FACILITIES. INSTALL 1868 FEET OF 4 INCH POLY ALONG LONGHORN TRAIL AND ABANDON 1880 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1950 080.63917 1,194 INSTALL 602 FEET OF 4 INCH POLY ALONG 3RD STREET AND ABANDON 110 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WALNUT SPRINGS SYSTEM INTEGRITY OCTOBER 1951 080.63919 724 INSTALL 450 FEET OF 2 INCH AND 4INCH POLY AND ABANDON 250 FEET OF 2 INCH AND 100 FEET OF 3 INCH STEEL ALONG BRIGGS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1952 080.63937 261 RELOCATE FACILITIES. INSTALL 70 FEET OF 6 INCH POLY ALONG KELLER PARKWAY AND ABANDON 50 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF KELLER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER RELOCATION OF FACILITIES OCTOBER 1953 080.63938 1,319 RELOCATE FACILITIES. INSTALL (9) POLY SERVICES AND ABANDON (9) POLY SERVICES ALONG STEEPLECHASE DRIVE TO ACCOMMODATE THE CITY OF IRVING IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 1954 080.63942 1,047 INSTALL 389 FEET OF 4 INCH POLYALONG LAMAR STREET AND ABANDON 96 FEET OF 4 INCH STEEL AND 307 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROYSE CITY SYSTEM INTEGRITY OCTOBER 1955 080.63945 1,120,640 RELOCATE FACILITIES. INSTALL 1265 FEET OF 6 INCH AND 450 FEET OF 2 INCH POLY, 200 FEET OF 10 INCH STEEL CASING AND DISTRICT REGULATOR STATION #009 ALONG NORTHEAST MAIN AND ABAONDON 1265 FEET OF 6 INCH STEEL AND 2 DRSS TO ACCOMODATE THE CITY OF ENNIS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY SEPTEMBER 1956 080.63946 3,243 INSTALL 3826 FEET OF 2 INCH POLY ALONG CROXTON ROAD AND ABANDON 945 FEET OF 2 INCH STEEL AND 2251 FEET OF 2 INCH POLY AND 70 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA SYSTEM INTEGRITY OCTOBER 1957 080.63955 417 INSTALL 38 FEET OF 2 INCH POLY ALONG 9TH STREET AND ABANDON 23 FEET OF 2 INCH STEEL AND 25 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 1958 080.63970 1 ABANDON DISTRICT REGULATOR STATION 93 ALONG SHEFIELD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 1959 080.63977 3,415 INSTALL 254 FEET OF 6 INCH AND 11 FEET OF 4 INCH POLY AND ABANDON 212 FEET OF 6 INCH STEEL AND 23 FEET OF 6 INCH AND 3 FEET OF 4 INCH POLY ALONG LOCUST STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER 1960 080.63978 1,155 INSTALL 1023 FEET OF 2 INCH POLY ALONG PECAN STREET AND 395 FEET OF 4 INCH POLY AND ABANDON 1580 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER 1961 080.63979 894 RELOCATE FACILITIES. INSTALL 927 FEET OF 2 INCH POLY AND ABANDON 42 FEET OF 2 INCH POLY ALONG HAWTHORNE STREET TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 1962 080.63995 930 RELOCATE FACILITIES. INSTALL 154 FEET OF 2 INCH POLY AND ABANDON 184 FEET OF 2 INCH STEEL ALONG PRAIRIE STREET TO ACCOMMODATE CITY OF EVERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN RELOCATION OF FACILITIES OCTOBER 1963 080.64001 200 RELOCATE FACILITIES. INSTALL 46 FEET OF 2 INCH POLY AND ABANDON 27 FEET OF 2 INCH POLY ALONG PEARSON AVENUE TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES OCTOBER 1964 080.64003 667 INSTALL 150 FEET OF 2 INCH POLY ALONG ROCKWALL AND ABANDON 265 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER 1965 080.64005 728 RELOCATE FACILITIES. INSTALL 155 FEET OF 8 INCH POLY ALONG GREENS PRAIRIE TRAIL AND ABANDON 135 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF COLLEGE STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES OCTOBER 1966 080.64016 2,750 INSTALL 1030 FEET OF 2 INCH POLY ALONG RANCH ROAD AND MESQUITE LANE AND ABANDON 5 FEET OF 6 INCH AND 7 FEET OF 4 INCH POLY AND 581 FEET OF 2 INCH STEEL AND 475 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER 1967 080.64025 146,344 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY SWEETWATER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER 1968 080.64026 3,041 INSTALL 6 FEET OF 2 INCH POLY AND 4 FEET OF 4 INCH POLY AND 608 FEET OF 6 INCH POLY AND ABANDON 537 FEET OF 2 INCH STEEL ALONG WILLIAMS DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER 1969 080.64035 7 ABANDON DISTRICT REGULATOR 157 IN FORT WORTH ALONG GLEN GARDEN DRIVE AND SOUTH RIVERSIDE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1970 080.64049 159,924 INSTALL 120 FEET OF 2 INCH POLY AND 180 FEET OF 4 INCH POLY AND 780 FEET OF 6 INCH POLY AND 800 FEET OF 12 INCH POLY AND ABANDON 15 FEET OF 2 INCH STEEL AND 20 FEET OF 4 INCH STEEL AND 40 FEET OF 4 INCH POLY AND 70 FEET OF 6 INCH STEEL AND 1187 FEET OF 12 INCH STEEL ALONG JONES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1971 080.64051 1,821 INSTALL 301 FEET OF 2 INCH POLY AND 258 FEET OF 4 INCH POLY AND ABANDON 333 FEET OF 2 INCH POLY AND 263 FEET OF 3 INCH STEEL ALONG SMALL HILL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 1972 080.64053 3,253 INSTALL 1245 FEET OF 4 INCH POLY AND ABANDON 1015 FEET OF 4 INCH STEEL AND 400 FEET OF 4 INCH POLY ALONG NEW YORK AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 1973 080.64070 45 RELOCATE FACILITIES. INSTALL 21 FEET OF 4 INCH POLY AND ABANDON 10 FEET OF 4 INCH POLY ALONG CROSSLAKE PARKWAY TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 1974 080.64090 130,445 RELOCATE FACILITIES. ABANDON 55 FEET OF 2 INCH STEEL AND 1934 FEET OF 2 INCH POLY AND 149 FEET OF 3 INCH STEEL AND 700 FEET OF 3 INCH POLY AND 356 FEET OF 4 INCH STEEL ALONG MELISSA ROAD TO ACCOMMODATE CITY OF MELISSA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA RELOCATION OF FACILITIES OCTOBER 1975 080.64103 (18) RELOCATE FACILITIES. ABANDON 287 FEET OF 6 INCH POLY ALONG DALLAS PARKWAY TO ACCOMMODATE CITY OF FRISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO RELOCATION OF FACILITIES OCTOBER 1976 080.64115 219 INSTALL (1) SERVICE LINE AND ABANDON DALLAS DRS249 ALONG PRESTON ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER 1977 080.64118 231 INSTALL RTU AT DISTRICT REGULATOR 02 ALONG LINE L8C AND ABANDON RTU AND VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY OCTOBER MTX Additions Page 63 of 178 282 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 1978 080.64122 2,765 RELOCATE FACILITIES. INSTALL 776 FEET OF 2 INCH POLY AND ABANDON 969 FEET OF 2 INCH POLY ALONG DENLEY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 1979 080.64128 2,043 RELOCATE FACILITIES. INSTALL 1223 FEET OF 2 INCH POLY AND 17 FEET OF 3 INCH POLY AND 13 FEET OF 4 INCH POLY AND ABANDON 1148 FEET OF 3 INCH STEEL ALONG CRENSHAW DRIVE TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 1980 080.64130 174,433 RELOCATE FACILITIES. INSTALL 277 FEET OF 2 INCH POLY AND 16 FEET OF 3 INCH POLY AND 13 FEET OF 4 INCH POLY AND 2493 FEET OF 8 INCH POLY AND ABANDON 16 FEET OF 3 INCH POLY AND 13 FEET OF 6 INCH STEEL AND 2200 FEET OF 8 INCH STEEL ALONG HAMPTON ROAD TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 1981 080.64131 150,148 RELOCATE FACILITIES. INSTALL 1011 FEET OF 12 INCH AND 1190 FEET OF 2 INCH POLY AND ABANDON 930 FEET OF 16 INCH STEEL AND 208 FEET OF 2 INCH POLY ALONG GASTON AVENUE TO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 1982 080.64132 12,514 RELOCATE FACILITIES. INSTALL 2850 FEET OF 4 INCH POLY AND ABANDON 2850 FEET OF 4 INCH POLY ALONG US HIGHWAY 175 TO ACCOMMODATE TXDOT STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS RELOCATION OF FACILITIES OCTOBER 1983 080.64138 135 INSTALL 282 FEET OF 2 INCH POLY ALONG WEST CEDAR AND ABANDON 278 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY OCTOBER 1984 080.64139 48,597 RELOCATE FACILITIES. INSTALL 625 FEET OF 4 INCH POLY AND ABANDON 400 FEET OF 4 INCH STEEL AND 88 FEET OF 4 INCH POLY ALONG FM 407 TO ACCOMMODATE CITY OF JUSTIN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JUSTIN RELOCATION OF FACILITIES OCTOBER 1985 080.64141 36,675 INSTALL 2200 FEET OF 12 INCH, 275 FEET OF 4 INCH AND 90 FEET OF 2 INCH POLY ABANDON 198 FEET OF 2 INCH STEEL AND 360 FEET OF 6 INCH STEEL AND 2128 FEET OF 18 INCH STEEL ALONG SCYENE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 1986 080.64144 297 RELOCATE FACILITIES. INSTALL 90 FEET OF 4 INCH POLY ALONG WEST FELIX AND ABANDON 70 FEET OF 4 INCH CAST IRON TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1987 080.64146 1,366 RELOCATE FACILITIES. INSTALL 255 FEET OF 4 INCH POLY AND 230 FEET OF 6 INCH POLY AND ABANDON 50 FEET OF 4 INCH STEEL AND 210 FEET OF 4 INCH POLY AND 220 FEET OF 6 INCH POLY ALONG HEMPHILL DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1988 080.64150 23,392 INSTALL 1049 FEET OF 4 INCH POLY AND ABANDON 139 FEET OF 2 INCH STEEL AND 935 FEET OF 3 INCH STEEL ALONG CHURCH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER 1989 080.64152 7 ABANDON DISTRICT REGULATOR 130 IN FORT WORTH AT THE EVANS AVENUE AND EAST JESSAMINE STREET. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 1990 080.64154 12,988 RELOCATE FACILITIES. INSTALL 177 FEET OF 6 INCH POLY ALONG HERITAGE TRACE ALONG FARM TO MARKET ROAD 156 AND ABANDON 150 FEET OF 6 INCH POLY TO ACCOMMODATE TEXAS DEPARTMENT OF TRANSPORTATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1991 080.64155 3,794 RELOCATE FACILITIES. INSTALL 809 FEET OF 6 INCH POLY AND ABANDON 809 FEET OF 6 INCH POLY ALONG FM 156 TO ACCOMMODATE TXDOT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1992 080.64157 39,550 RELOCATE FACILITIES. INSTALL 7 FEET OF 2 INCH POLY AND 232 FEET OF 6 INCH POLY AND ABANDON 10 FEET OF 2 INCH POLY ALONG VICTORIA DRIVE AND FM 156 TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1993 080.64158 43,927 RELOCATE FACILITIES. INSTALL 16 FEET OF 2 INCH POLY AND 166 FEET OF 6 INCH POLY AND ABANDON 12 FEET OF 2 INCH POLY ALONG HIGHLAND DRIVE AND FM 156 TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1994 080.64159 55,446 RELOCATE FACILITIES. INSTALL 1000 FEET OF 6 INCH POLY AND ABANDON 525 FEET OF 6 INCH STEEL ALONG WESTERN CENTER TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 1995 080.64163 5,551 INSTALL 2594 FEET OF 4 INCH POLY AND ABANDON 2255 FEET OF 3 INCH STEEL AND 346 FEET OF 3 INCH POLY ALONG BRYANT AND ARCHER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLYDE SYSTEM INTEGRITY OCTOBER 1996 080.64168 0 ABANDON DISTRICT REGULATOR STATION #048 IN DALLAS AS PART OF THE AREA REPLACEMENT PROJECT AR ID#1627.1 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 1997 080.64173 105 INSTALL 151 FEET OF 2 INCH POLY AND ABANDON 765 FEET OF 2 INCH STEEL AND 210 FEET OF 2 INCH POLY AND 483 FEET OF 3 INCH STEEL AND 39 FEET OF 3 INCH POLY AND 400 FEET OF 4 INCH STEEL AND 40 FEET OF 4 INCH POLY ALONG MCLELLAND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY OCTOBER 1998 080.64175 7,813 INSTALL 951 FEET OF 2 INCH POLY AND 2423 FEET OF 4 INCH POLY AND ABANDON 2359 FEET OF 2 INCH STEEL AND 481 FEET OF 2 INCH POLY AND 173 FEET OF 4 INCH STEEL ALONG ARKANSAS AND MORRIS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEYMOUR SYSTEM INTEGRITY OCTOBER 1999 080.64185 8,660 RELOCATE FACILITIES. INSTALL 394 FEET OF 6 INCH POLY AND ABANDON 295 FEET OF 6 INCH POLY ALONG COPPER CROSSING DRIVE ACROSS F.M. 156 TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2000 080.64186 7,576 RELOCATE FACILITIES. INSTALL 4 FEET OF 4 INCH POLY AND 224 FEET OF 6 INCH POLY AND ABANDON 210 FEET OF 4 INCH POLY AND 8 FEET OF 6 INCH POLY ALONG GRAND CENTRAL PARKWAY ACROSS F.M. 156 TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2001 080.64193 7 ABANDON DISTRICT REGULATOR STATION 158 IN FORT WORTH AT THE TENNESSEE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 2002 080.64198 1,828 INSTALL 1095 FEET OF 2 INCH POLY AND ABANDON 127 FEET OF 2 INCH POLY AND 423 FEET OF 4 INCH STEEL ALONG RINGLING LAKE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND SYSTEM INTEGRITY OCTOBER 2003 080.64202 11,023 RELOCATE FACILITIES. INSTALL 381 FEET OF 2 INCH POLY AND ABANDON 390 FEET OF 2 INCH STEEL ALONGWEST THIRD STREET TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 2004 080.64216 19,733 INSTALL 2021 FEET OF 2 INCH POLY AND 2 FEET OF 3 INCH POLY AND 2344 FEET OF 4 INCH POLY AND ABANDON 3224 FEET OF 3 INCH STEEL AND 326 FEET OF 3 INCH POLY AND 495 FEET OF 4 INCH STEEL AND 345 FEET OF 4 INCH POLY AND 1055 FEET OF 6 INCH STEEL AND 80 FEET OF 6 INCH POLY ALONG 27TH AND AVE O IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER 2005 080.64234 9,923 INSTALL 4600 FEET OF 2 INCH POLY ALONG THE STREETS OF GIDEON GROVE NORTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH OCTOBER MTX Additions Page 64 of 178 283 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2006 080.64247 1,462 INSTALL 2410 FEET OF 2 INCH POLY AND 412 FEET OF 4 INCH POLY AND ABANDON 142 FEET OF 2 INCH STEEL AND 643 FEET OF 2 INCH POLY AND 2324 FEET OF 3 INCH STEEL AND 18 FEET OF 3 INCH POLY ALONG ORCHARD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY OCTOBER 2007 080.64248 883 INSTALL 510 FEET OF 4 INCH POLY AND INSTALL ALONG HICKORY STREET AND PRESTON ROAD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FRISCO GROWTH MARCH 2008 080.64249 471 INSTALL 347 FEET OF 2 INCH POLY AND ABANDON 395 FEET OF 2 INCH STEEL AND 139 FEET OF 2 INCH POLY AND 366 FEET OF 3 INCH STEEL AND 127 FEET OF 3 INCH POLY AND 475 FEET OF 4 INCH STEEL ALONG MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAINT JO SYSTEM INTEGRITY OCTOBER 2009 080.64254 947 RELOCATE FACILITIES. INSTALL (15) 0.75 INCH SERVICE LINES ALONG MOLLIMAR AND ABANDON (15) 0.75 INCH SERVICES TO ACCOMMODATE THE CITY OF PLANO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES OCTOBER 2010 080.64274 445 RELOCATE FACILITIES. INSTALL 28 FEET OF 3 INCH POLY AND ABANDON 28 FEET OF 3 INCH POLY ALONG MUNICIPAL TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES OCTOBER 2011 080.64295 1,253 INSTALL DISTRICT REGULATOR STATION ALONG WILCOX AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKDALE SYSTEM INTEGRITY OCTOBER 2012 080.64302 1 ABANDON DISTRICT REGULATOR STATION 081 IN UNIVERSITY PARK, DALLAS COUNTY AS PART OF THE AREA REPLACEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER 2013 080.64303 950 INSTALL 1790 FEET OF 2 INCH POLY AND ABANDON 3283 FEET OF 2 INCH POLY ALONG FM498 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY OCTOBER 2014 080.64305 350 ABANDON DISTRICT REGULATOR STATION #15 IN ABILENE TAYLOR COUNTY AS PART OF THE AREA REPLACEMENTS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 2015 080.64309 1 ABANDON DISTRICT REGULATOR STATION 033 ALONG BISBEE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 2016 080.64312 1,041 RELOCATE FACILITIES. INSTALL 420 FEET OF 6 INCH POLY AND ABANDON 410 FEET OF 6 INCH POLY ALONG KELLER HASLET ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2017 080.64317 1,963 RELOCATE FACILITIES. INSTALL 353 FEET OF 4 INCH POLY AND ABANDON 340 FEET OF 4 INCH POLY MAIN ALONG SH 360 TO ACCOMMODATE CONSTRUCTION OF COMMERCIAL DRIVEWAY FOR AMERICAN AIRLINES FACILITY. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES JANUARY 2018 080.64319 1,134 INSTALL 312 FEET OF 2 INCH POLY AND ABANDON 301 FEET OF 2 INCH STEEL ALONG CARDINAL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MURCHISON SYSTEM INTEGRITY OCTOBER 2019 080.64322 247 RELOCATE FACILITIES. INSTALL 15 FEET OF 4 INCH POLY AND ABANDON 10 FEET OF 4 INCH POLY ALONG CLEVELAND AVENUE TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 2020 080.64323 (11) ABANDON 10 FEET OF 2 INCH STEEL AND 137 FEET OF 2 INCH POLY ALONG IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 2021 080.64326 35,662 RELOCATE FACILITIES. INSTALL 1053 FEET OF 2 INCH POLY AND 609 FEET OF 6 INCH POLY AND ABANDON 1367 FEET OF 2 INCH STEEL ALONG WATERCRESS DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2022 080.64328 1,065 INSTALL 117 FEET OF 2 INCH POLY AND 781 FEET OF 4 INCH POLY AND ABANDON 65 FEET OF 2 INCH STEEL AND 772 FEET OF 3 INCH STEEL ALONG EAST MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY OCTOBER 2023 080.64330 18,264 INSTALL 143 SERVICE LINES AND ABANDON 143 SERVICE LINES IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2024 080.64339 433 RELOCATE FACILITIES. INSTALL 10 FEET OF 2 INCH POLY AND 13 FEET OF 4 INCH POLY AND 114 FEET OF 6 INCH POLY AND ABANDON 7 FEET OF 2 INCH POLY AND 105 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2025 080.64341 1,139 INSTALL 462 FEET OF 2 INCH POLY AND ABANDON 195 FEET OF 2 INCH STEEL AND 165 FEET OF 2 INCH POLY ALONG MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 2026 080.64342 938 INSTALL 305 FEET OF 2 INCH POLY AND ABANDON 300 FEET OF 2 INCH STEEL ALONG AL LIPSCOM WAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2027 080.64346 73,681 FUNCTIONAL PROJECT COVERING THE REPLACEMENT OF MAINS AND SERVICE LINES IN GEORGETOWN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER 2028 080.64366 150,649 RELOCATE FACILITIES. INSTALL NEW DRS ON TUCASA ST. AND ABANDON 330 FEET OF 8 INCH STEEL, 481 FEET OF 6 INCH STEEL AND 500 FEET OF 4 INCH IP PE ALONG GRAUWYLER RD. TO ACCOMMODATE TX-DOT CAPITAL HIGHWAY PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 2029 080.64376 885 RELOCATE FACILITIES. INSTALL (14) POLY SERVICES ALONG NORTH TRAIL STREET AND ABANDON (4) POLY SERVICES AND (10) STEEL SERVICES TO ACCOMMODATE CITY OF CROWLEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY RELOCATION OF FACILITIES OCTOBER 2030 080.64378 (41) ABANDON 544 FEET OF 2 INCH POLY ALONG VAUGHN DRIVE TO ACCOMMODATE THE CITY OF BURLESON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY OCTOBER 2031 080.64380 333 RELOCATE FACILITIES. INSTALL 38 FEET OF 6 INCH POLY AND ABANDON 30 FEET OF 6 INCH STEEL ALONG SPRAGUE DRIVE TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT. IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES OCTOBER 2032 080.64393 2,197 RELOCATE FACILITIES. INSTALL 1816 FEET OF 2 INCH POLY AND ABANDON 1791 FEET OF 2 INCH POLY ALONG FOLKSTONE DRIVE TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL RELOCATION OF FACILITIES OCTOBER 2033 080.64395 2,227 INSTALL 181 FEET OF 2 INCH POLY AND 397 FEET OF 4 INCH POLY AND 1287 FEET OF 8 INCH POLY AND ABANDON 75 FEET OF 2 INCH STEEL AND 56 FEET OF 2 INCH POLY AND 376 FEET OF 4 INCH STEEL AND 1125 FEET OF 8 INCH STEEL ALONG FAIRBANKS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER 2034 080.64398 31,686 RELOCATE FACILITIES. INSTALL 980 FEET OF 2 INCH, 625 FEET OF 4 INCH, 5980 FEET OF 6 INCH AND 225 FEET OF 8 INCH POLY ALONG SH 352 AND ABANDON 975 FEET OF 2 INCH, 125 FEET OF 3 INCH AND 6470 FEET OF 4 INCH POLY THE ACCOMMODATE TXDOT DRAINAGE PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE RELOCATION OF FACILITIES OCTOBER 2035 080.64399 1,081 RELOCATE FACILITIES. INSTALL 2,775 FEET OF 4 INCH POLY ALONG RED BIRD MALL AND ABANDON 1,750 FEET OF 2 INCH AND 1,060 FEET OF 4 INCH POLY TO ACCOMMODATE NEW CONSTRUCTION. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES DECEMBER 2036 080.64400 6,997 INSTALL 1060 FEET OF 2 INCH POLY AND 3412 FEET OF 4 INCH POLY AND ABANDON 185 FEET OF 2 INCH STEEL AND 3894 FEET OF 4 INCH STEEL AND 30 FEET OF 4 INCH POLY AND 738 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLORADO CITY SYSTEM INTEGRITY OCTOBER 2037 080.64407 893 INSTALL DISTRICT REGULATOR STATION ALONG VICTORIA AND ABANDON DISTRICT REGULATOR STATION 26 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR SYSTEM INTEGRITY OCTOBER MTX Additions Page 65 of 178 284 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2038 080.64410 170 RELOCATE FACILITIES. INSTALL 15 FEET OF 4 INCH STEEL AND ABANDON 10 FEET OF 4 INCH STEEL ALONG HARRISON LANE TO ACCOMMODATE CITY OF HURST STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST RELOCATION OF FACILITIES OCTOBER 2039 080.64414 9,927 RELOCATE FACILITIES. INSTALL 46 FEET OF 2 INCH STEEL AND 12 FEET OF 8 INCH STEEL AND ABANDON 4 FEET OF 6 INCH STEEL AND 8 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF SOUTHLAKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE RELOCATION OF FACILITIES OCTOBER 2040 080.64416 807 INSTALL DISTRICT REGULATOR STATION ALONG SAUNDERS STREET AND ABANDON DISTRICT REGULATOR STATION 15 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE SYSTEM INTEGRITY OCTOBER 2041 080.64420 1,234 RELOCATE FACILITIES. INSTALL 420 FEET OF 6 INCH POLY AND ABANDON 400 FEET OF 6 INCH STEEL ALONG CARROLL STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2042 080.64422 7 ABANDON DISTRICT REGULATOR STATION ALONG ROBINWOOD DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 2043 080.64423 7 ABANDON DISTRICT REGULATOR STATION ALONG MICKI LYNN AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 2044 080.64424 1,507 RELOCATE FACILITIES. INSTALL 10 FEET OF 4 INCH POLY AND 330 FEET OF 8 INCH POLY AND ABANDON 10 FEET OF 4 INCH POLY AND 330 FEET OF 8 INCH POLY ALONG BUSINESS 114 TO ACCOMMODATE CITY OF ROANOKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROANOKE RELOCATION OF FACILITIES OCTOBER 2045 080.64431 3,608 INSTALL 1900 FEET OF 4 INCH POLY AND 2900 FEET OF 2 INCH POLY ALONG PARK PLACE BOULEVARD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH OCTOBER 2046 080.64434 2,201 RELOCATE FACILITIES. INSTALL 49 POLY SERVICES AND ABANDON 49 POLY AND STEEL SERVICES ALONG COLLINS STREET TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 2047 080.64438 42,072 RELOCATE FACILITIES. INSTALL 1027 FEET OF 2 INCH POLY AND 1569 FEET OF 6 INCH POLY AND 3 FEET OF 8 INCH POLY AND ABANDON 1162 FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY AND 48 FEET OF 6 INCH STEEL ALONG LAKE DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2048 080.64440 262 INSTALL 311 FEET OF 2 INCH POLY AND ABANDON 213 FEET OF 2 INCH STEEL AND 70 FEET OF 2 INCH POLY AND 14 FEET OF 3 INCH STEEL ALONG CAROLINA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2049 080.64442 35,053 RELOCATE FACILITIES. INSTALL 185 FEET OF 8 INCH, 2750 FEET OF 6 INCH AND 2750 FEET OF 4 INCH POLY ALONG BETSY LANE AND ABANDON 2800 FEET OF 8 INCH STEEL TO ACCOMMODATE THE CITY OF IRVING IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 2050 080.64451 9,010 INSTALL 534 FEET OF 2 INCH POLY AND ABANDON 498 FEET OF 2 INCH STEEL ALONG MASSEY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER 2051 080.64467 4,356 INSTALL 990 FEET OF 2 INCH POLY AND 65 FEET OF 4 INCH POLY AND 940 FEET OF 6 INCH POLY AND ABANDON 740 FEET OF 2 INCH STEEL AND 52 FEET OF 4 INCH STEEL AND 68 FEET OF 4 INCH POLY AND 820 FEET OF 6 INCH STEEL AND 118 FEET OF 6 INCH POLY ALONG PENROSE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2052 080.64471 5,439 RELOCATE FACILITIES. INSTALL 10 FEET OF 3 INCH POLY AND 2248 FEET OF 4 INCH POLY AND ABANDON 991 FEET OF 3 INCH STEEL AND 815 FEET OF 3 INCH POLY AND 486 FEET OF 4 INCH STEEL ALONG HILLCREST TO ACCOMMODATE CITY OF HICO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HICO RELOCATION OF FACILITIES OCTOBER 2053 080.64472 234 ABANDON DISTRICT REGULATOR STATION #201 IN DALLAS AS PART OF THE AREA REPLACEMENT PROJECT AR ID#1738.1 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2054 080.64474 (8) ABANDON DISTRICT REGULATOR STATION 031 ALONG SPRING AVENUE IN DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2055 080.64487 6,480 INSTALL 25 FEET OF 4 INCH POLY AND 1800 FEET OF 6 INCH POLY AND ABANDON 50 FEET OF 2 INCH POLY AND 850 FEET OF 4 INCH STEEL AND 675 FEET OF 6 INCH STEEL ALONG VICKERY DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2056 080.64491 1,100 ABANDON DISTRICT REGULATOR STATION 027 ALONG GASTON IN DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2057 080.64493 406 RELOCATE FACILITIES. INSTALL 230 FEET OF 2 INCH POLY AND ABANDON 214 FEET OF 2 INCH POLY ALONG GUENTHER AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2058 080.64494 50,673 INSTALL 3000 FEET OF 4 INCH POLY AND 4850 FEET OF 2 INCH POLY ALONG THE STREETS OF TRIPLE DIAMOND RANCH SUBDIVISION IN MANSFIELD, TX. RESIDENTIAL MANSFIELD GROWTH DECEMBER 2059 080.64495 3,240 RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH POLY AND ABANDON 275 FEET OF 4 INCH STEEL ALONG KIMBERLY DRIVE TO ACCOMMODATE THE CITY OF ARLINGTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 2060 080.64500 4,294,419 INSTALL 6.5 MILES OF 12 INCH STEEL AND 1.5 MILES OF 12 INCH, 0.65 MILES OF 8 INCH AND 1.65 MILES OF 6 INCH POLY AND ABANDON 5.1 MILES OF 12 INCH STEEL AND 4.05 MILES OF 16 INCH STEEL ALONG GARDEN RIDGE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY DECEMBER 2061 080.64506 64 INSTALL 148 FEET OF 2 INCH POLY AND ABANDON 437 FEET OF 2 INCH STEEL AND 568 FEET OF 2 INCH POLY ALONG 4TH AND ELM IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEGARGEL SYSTEM INTEGRITY OCTOBER 2062 080.64517 3,181 INSTALL 343 FEET OF 2 INCH POLY AND ABANDON 330 FEET OF 2 INCH POLY ALONG SW 3RD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER 2063 080.64518 0 ABANDON (1) DISTRICT REGULATOR STATION ALONG WILDER AVENUE STREET IN THE TOWN OF BELLMEAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELLMEAD SYSTEM INTEGRITY OCTOBER 2064 080.64519 976 INSTALL 431 FEET OF 2 INCH POLY AND ABANDON 383 FEET OF 2 INCH STEEL AND 48 FEET OF 2 INCH POLY ALONG DAVIS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER 2065 080.64522 42,098 RELOCATE FACILITIES. INSTALL 980 FEET OF 2 INCH POLY AND 1425 FEET OF 8 INCH POLY AND ABANDON 390 FEET OF 2 INCH STEEL AND 583 FEET OF 2 INCH POLY AND 284 FEET OF 6 INCH STEEL ALONG WATERCRESS DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2066 080.64527 510 RELOCATE FACILITIES. INSTALL 6 FEET OF 4 INCH POLY AND 130 FEET OF 6 INCH POLY AND ABANDON 6 FEET OF 4 INCH POLY AND 140 FEET OF 6 INCH POLY ALONG MORRISS ROAD TO ACCOMMODATE CITY OF FLOWER MOUND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND RELOCATION OF FACILITIES OCTOBER 2067 080.64531 (419,921) RELOCATE FACILITIES. INSTALL 900 FEET OF 6 INCH POLY AND ABANDON 900 FEET OF 6 INCH POLY ALONG MARK IV PARKWAY TO ACCOMMODATE TXDOT CONFLICT. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES MARCH 2068 080.64540 110,980 INSTALL 3 VALVES, 28 FEET OF 10 INCH STEEL, AND 135 FEET OF 16 INCH STEEL AND ABANDON 2 VALVES, 47 FEET OF 10 INCH STEEL, 105 FEET OF 12 INCH STEEL, AND 116 FEET OF 16 INCH STEEL ALONG PIPELINE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY OCTOBER 2069 080.64541 84,262 INSTALL 120 FEET OF 16 INCH STEEL AND ABANDON 120 FEET OF 12 INCH STEEL ALONG PIPELINE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY OCTOBER MTX Additions Page 66 of 178 285 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2070 080.64546 36,213 INSTALL 2550 FEET OF 12 INCH, 60 FEET OF 8 INCH, 425 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG SOUTH LANCASTER ROAD AND ABANDON 2550 FEET OF 12 INCH, 80 FEET OF 8 INCH AND 30 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2071 080.64551 2,574 INSTALL (2) REGLUATORS AND (1) RELIEF VALVE, ABANDON (2) REGLUATORS AND (1) RELIEF VALVE ALONG LINE L15-5 IN THE TOWN OF GATESVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE SYSTEM INTEGRITY OCTOBER 2072 080.64553 994 INSTALL CLOCK SPRINGS ALONG LINE D IN DALLAS COUNTY TO REMEDIATE ANOMALIES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER 2073 080.64556 1,830 RELOCATE FACILITIES. INSTALL 1350 FEET OF 2 INCH POLY AND ABANDON 1285 FEET OF 2 INCH POLY ALONG BRENNAN DRIVE TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES OCTOBER 2074 080.64557 512 RELOCATE FACILITIES. INSTALL 41 FEET OF 4 INCH POLY AND ABANDON 40 FEET OF 3 INCH STEEL ALONG HIGHWAY 377 TO ACCOMMODATE CITY OF ARGYLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARGYLE RELOCATION OF FACILITIES OCTOBER 2075 080.64558 9,898 RELOCATE FACILITIES. INSTALL 1950 FEET OF 2 INCH POLY ALONG MONTICELLO AND ABANDON 1900 FEET OF 1.25 INCH POLY TO ACCOMMODATE THE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES OCTOBER 2076 080.64559 1,569 INSTALL 375 FEET OF 4 INCH POLY AND ABANDON 188 FEET OF 2 INCH STEEL AND 187 FEET OF 4 INCH STEEL ALONG NANTUCKET DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY OCTOBER 2077 080.64569 44,663 RELOCATE FACILITIES. INSTALL 2586 FEET OF 4 INCH AND 70 FEET OF 8 INCH POLY ALONG PENINSULA CLUB CIRCLE AND ABANDON 2163 FEET OF 2 INCH STEEL, 507 FEET OF 1.25 INCH, 90 FEET OF 2 INCH AND 60 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2078 080.64571 1,719 INSTALL 370 FEET OF 2 INCH POLY AND 400 FEET OF 4 INCH POLY AND ABANDON 712 FEET OF 2 INCH POLY AND 510 FEET OF 4 INCH STEEL AND 5 FEET OF 4 INCH POLY AND 72 FEET OF 6 INCH STEEL ALONG PATRICK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUBLIN SYSTEM INTEGRITY OCTOBER 2079 080.64572 32,864 RELOCATE FACILITIES. NSTALL 1352 FEET OF 4 INCH AND 493 FEET OF 8 INCH POLY ALONG PENINSULA CLUB CIR WESTAND ABANDON 1352 FEET OF 2 INCH STEEL AND 483 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF LAKE WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2080 080.64576 272 RELOCATE FACILITIES. INSTALL 94 FEET OF 8 INCH POLY AND ABANDON 82 FEET OF 8 INCH POLY ALONG IH 30 AND AIRPORT ROAD TO ACCOMMODATE CITY OF ROCKWALL STREET IMPROVEMENT PROJECT.IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL RELOCATION OF FACILITIES OCTOBER 2081 080.64579 6,773 ABANDON 2217 FEET OF 2 INCH STEEL, 6 FEET OF 3 INCH STEEL, 720 FEET OF 4 INCH STEEL, AND 1311 FEET OF 6 INCH STEEL ALONG RANGER ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER SYSTEM INTEGRITY OCTOBER 2082 080.64583 7,024 INSTALL 66 FEET OF 12 INCH STEEL AND ABANDON 70 FEET OF 12 INCH STEEL ALONG LINE CA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2083 080.64584 57,941 RELOCATE FACILITIES. INSTALL 417 FEET OF 2 INCH AND 2503 FEET OF 6 INCH POLY AND ABANDON 2066 FEET OF 4 INCH, 291 FEET OF 2 INCH POLY ALONG MCKINNEY STREET TO ACCOMMODATE CITY OF DENTON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 2084 080.64589 43,700 RELOCATE FACILITIES. INSTALL 2643 FEET OF 2 INCH, 30 FEET OF 4 INCH AND 2916 FEET OF 6 INCH POLY ALONG GLADE ROAD AND ABANDON 148 FEET OF 2 INCH, 30 FEET OF 3 INCH, 409 FEET OF 4 INCH AND 292 FEET OF 6 INCH POLY AND 2274 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF COLLEYVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE RELOCATION OF FACILITIES OCTOBER 2085 080.64593 13,930 RELOCATE FACILITIES. INSTALL 1400 FEET OF 2 INCH POLY AND ABANDON 1390 FEET OF 2 INCH POLY ALONG HOLLAND DRIVE TO ACCOMMODATE THE CITY OF GARLAND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER 2086 080.64594 14,778 RELOCATE FACILITIES. INSTALL 1100 FEET OF 2 INCH POLY ALONG GREEN OAKS DRIVE AND ABANDON 1090 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF GARLAND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER 2087 080.64599 40,511 RELOCATE FACILITIES. INSTALL 1384 DEET OF 8 INCH POLY AND ABANDON 635 FEET OF 8 INCH POLY ALONG TEEL PARKWAT TO ACCOMMODATE CITY OF FRISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO RELOCATION OF FACILITIES OCTOBER 2088 080.64601 11,849 RELOCATE FACILITIES. INSTALL 1868 FEET OF 8 INCH AND 45 FEET OF 4 INCH POLY ALONG WATERCRESS DRIVE AND ABANDON 1739 FEET OF 8 INCH AND 89 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF LAKE WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH RELOCATION OF FACILITIES OCTOBER 2089 080.64603 44 ABANDON (1) DISTRICT REGULATOR STATION 11 ALONG IDLEWILD DRIVE IN THE TOWN OF BROWNWOOD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER 2090 080.64604 7,274 INSTALL 200 FEET OF STEEL AND ABANDON 200 FEET OF STEEL IN WISE COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2091 080.64606 18 ABANDON DISTRICT REGLUATOR STATION 12 IN SAN ANGELO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 2092 080.64608 57,608 INSTALL 3651 FEET OF 4 INCH AND 1218 FEET OF 2 INCH POLY ALONG THE STREETS OF VIZCAYA 6E, 6F AND 7C. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER 2093 080.64612 1,965 ABANDON 1500 FEET OF 2 INCH STEEL ALONG CARLSON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2094 080.64614 218 RELOCATE FACILITIES. INSTALL 27 FEET OF 6 INCH POLY AND ABANDON 19 FEET OF 6 INCH POLY ALONG CUSTER DRIVE AND LOOKOUT DRIVE TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES OCTOBER 2095 080.64629 (580) RELOCATE FACILITIES. INSTALL 1042 FEET OF 4 INCH POLY AND ABANDON 1037 FEET OF 4 INCH POLY ALONG US 87TO ACCOMMODATE TXDOT ROAD IMPROVEMENT PROJECT. ALL CUSTOMERS COMFORT RELOCATION OF FACILITIES JANUARY 2096 080.64630 347 RELOCATE FACILITIES. INSTALL 313 FEET OF 2 INCH POLY AND 80 FEET OF 4 INCH POLY AND ABANDON 4 FEET OF 2 INCH STEEL AND 303 FEET OF 2 INCH POLY AND 71 FEET OF 4 INCH STEEL ALONG KAZMEIER TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES OCTOBER 2097 080.64632 626 RELOCATE FACILITIES. INSTALL 374 FEET OF 2 INCH POLY AND ABANDON 199 FEET OF 3 INCH STEEL ALONG COLLEGE MAIN STREET TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES OCTOBER 2098 080.64633 776 INSTALL 984 FEET OF 2 INCH POLY AND ABANDON 1007 FEET OF 2 INCH STEEL ALONG HOLLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRANKLIN SYSTEM INTEGRITY OCTOBER 2099 080.64640 9 RELOCATE FACILITIES. ABANDON 25 FEET OF 4 INCH POLY ALONG COUNTY ROAD 110 TO ACCOMMODATE CITY OF ROUND ROCK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK RELOCATION OF FACILITIES OCTOBER 2100 080.64647 428 ABANDON 873 FEET OF 3 INCH STEEL ALONG LEHIGH DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER MTX Additions Page 67 of 178 286 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2101 080.64650 886 INSTALL 1057 FEET OF 2 INCH POLY AND 6 FEET OF 3 INCH POLY AND ABANDON 3 FEET OF 2 INCH POLY AND 1054 FEET OF 3 INCH STEEL ALONG OAK DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY OCTOBER 2102 080.64654 687 INSTALL 500 FEET OF 4 INCH AND 250 FEET OF 2 INCH POLY ALONG WEST 3RD AVENUE AND ABANDON 500 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 2103 080.64660 6 ABANDON 355 FEET OF 4 INCH STEEL ALONG MCKINNEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER 2104 080.64661 8,001 RELOCATE FACILITIES. INSTALL 1675 FEET OF 8 INCH POLY ALONG WATERCRESS DRIVE AND ABANDON 1677 FEET OF 6 INCH STEEL AND 480 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF LAKE WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH RELOCATION OF FACILITIES OCTOBER 2105 080.64662 649 RELOCATE FACILITIES. INSTALL 520 FEET OF 2 INCH POLY AND ABANDON 520 FEET OF 2 INCH POLY ALONG BUENA VISTA DRIVE TO ACCOMMODATE CITY OF MARBLE FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARBLE FALLS RELOCATION OF FACILITIES OCTOBER 2106 080.64669 863 RELOCATE FACILITIES. INSTALL 686 FEET OF 2 INCH POLY AND ABANDON 342 FEET OF 2 INCH STEEL AND 341 FEET OF 2 INCH POLY ALONG RHOMBURG STREET TO ACCOMMODATE CITY OF BURNET STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURNET RELOCATION OF FACILITIES OCTOBER 2107 080.64680 900 INSTALL 401 FEET OF 4 INCH POLY AND ABANDON 396 FEET OF 3 INCH STEEL ALONG CYPRESS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HUBBARD SYSTEM INTEGRITY OCTOBER 2108 080.64685 1,213 INSTALL 512 FEET OF 6 INCH POLY AND ABANDON 350 FEET OF 3 INCH STEEL ALONG SLOAN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR SYSTEM INTEGRITY OCTOBER 2109 080.64688 3,915 RELOCATE FACILITIES. INSTALL 1604 FEET OF 8 INCH POLY AND ABANDON 1602 FEET OF 6 INCH STEEL ALONG WATERCRESS DRIVE TO ACCOMMODATE CITY OF LAKE WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH RELOCATION OF FACILITIES OCTOBER 2110 080.64689 645 RELOCATE FACILITIES. INSTALL 199 FEET OF 4 INCH POLY AND ABANDON 107 FEET OF 2 INCH STEEL AND 25 FEET OF 3 INCH STEEL ALONG BULWER AVENUE TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES OCTOBER 2111 080.64691 906 RELOCATE FACILITIES. INSTALL 539 FEET OF 2 INCH POLY AND ABANDON 509 FEET OF 2 INCH STEEL ALONG HAMILTON STREET TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES OCTOBER 2112 080.64692 1,145 INSTALL 633 FEET OF 2 INCH POLY AND ABANDON 771 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 7 ALONG STREETS OF MIDLOTHIAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY OCTOBER 2113 080.64699 415 INSTALL 690 FEET OF 2 INCH POLY AND ABANDON 527 FEET OF 2 INCH STEEL, 126 FEET OF 2 INCH POLY, AND 327 FEET OF 6 INCH STEELAND DISTRICT REGULATOR STATION 03 ALONG MILL AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY OCTOBER 2114 080.64703 85,024 RELOCATE FACILITIES. INSTALL 2120 FEET OF 6 INCH, 120 FEET OF 4 INCH AND 90 FEET OF 2 INCH POLY ALONG RANCH VIEW RD. AND ABANDON 2120 FEET OF 6 INCH, 120 FEET OF 4 INCH AND 90 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2115 080.64712 152 INSTALL RELIEF VALVE AT REGULATOR STATION IN DENTON AND ABANDON TWO RELIEF VALVES AT DISTRICT REGULATOR STATION 34 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER 2116 080.64713 8 ABANDON DISTRICT REGULATOR STATION #138 IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2117 080.64717 649 INSTALL 4585 FEET OF 2 INCH AND 1570 FEET OF 4 INCH POLY ALONG THE STREETS OF MEDOW RUN SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH MARCH 2118 080.64719 4,163 RELOCATE FACILITIES. ABANDON 2000 FEET OF 6 INCH STEEL ALONG WATERCRESS DRIVE TO ACCOMMODATE CITY OF LAKE WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH RELOCATION OF FACILITIES OCTOBER 2119 080.64722 3,802 RELOCATE FACILITIES. INSTALL 677 FEET OF 3 INCH STEEL AND ABANDON 651 FEET OF 3 INCH STEEL ALONG AGAPE DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2120 080.64724 104,359 INSTALL 14700 FEET OF 2 INCH POLY AND ABANDON 28600 FEET OF 2 INCH POLY ALONG PICKREL ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNICORPORATED COUNTY AREA, (GOODLET) SYSTEM INTEGRITY OCTOBER 2121 080.64730 1,115 RELOCATE FACILITIES. INSTALL 633 FEET OF 4 INCH POLY AND ABANDON 633 FEET OF 4 INCH STEEL AND 15 FEET OF 4 INCH POLY ALONG SANDERSON AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2122 080.64735 1,003 INSTALL 716 FEET OF 2 INCH POLY AND ABANDON 95 FEET OF 2 INCH STEEL AND 92 FEET OF 2 INCH POLY AND 573 FEET OF 3 INCH STEEL ALONG NORTH COVINGTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 2123 080.64739 4,502 INSTALL DISTRICT REGULATOR STATION AND ABANDON MEDICIAL MOUND DISTRICT REGULATOR STATION 01 ALONG FM 1167 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILLICOTHE SYSTEM INTEGRITY OCTOBER 2124 080.64740 12,270 INSTALL 1700 FEET OF 2 INCH POLY AND 1570 FEET OF 4 INCH POLY AND ABANDON 132 FEET OF 2 INCH POLY, 906 FEET OF 4 INCH POLY, AND 766 FEET OF 6 INCH POLY ALONG SYLVANIA AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2125 080.64741 841 RELOCATE FACILITIES. INSTALL 499 FEET OF 2 INCH POLY AND 47 FEET OF 6 INCH POLY AND ABANDON 500 FEET OF 2 INCH STEEL AND 43 FEET OF 6 INCH STEEL ALONG CHUCK DRIVE TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES OCTOBER 2126 080.64750 19,515 INSTALL 900 FEET OF 2 INCH POLY ALONG FIELDSIDE AND ABANDON 890 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 2127 080.64769 287 RELOCATE FACILITIES. INSTALL 225 FEET OF 2 INCH POLY AND ABANDON 180 FEET OF 2 INCH POLY ALONG VERANDA LANE TO ACCOMMODATE CITY OF COLLEYVILLE IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE RELOCATION OF FACILITIES OCTOBER 2128 080.64770 1,244 INSTALL 1166 FEET OF 2 INCH POLY AND ABANDON 1152 FEET OF 2 INCH STEEL AND 6 FEET OF 2 INCH POLY ALONG MESQUITE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA SYSTEM INTEGRITY OCTOBER 2129 080.64775 977 INSTALL 478 FEET OF 2 INCH POLY AND 157 FEET OF 4 INCH POLY AND ABANDON 515 FEET OF 2 INCH STEEL, 408 FEET OF 2 INCH POLY AND 1 DISTRICT REGLUATOR STATION ALONG WILLOW STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MALONE SYSTEM INTEGRITY OCTOBER 2130 080.64776 1,311 INSTALL 690 FEET OF 2 INCH POLY AND ABANDON 700 FEET OF 2 INCH POLY AND 1 DISTRICT REGLUATOR STATION ALONG EVANS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER 2131 080.64781 5,594 RELOCATE FACILITIES. INSTALL 340 FEET OF 2 INCH POLY AND 1704 FEET OF 4 INCH POLY AND ABANDON 350 FEET OF 2 INCH POLY, 5 FEET OF 3 INCH STEEL, AND 1723 FEET OF 3 INCH POLY ALONG LACKLAND ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER MTX Additions Page 68 of 178 287 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2132 080.64784 1,837 INSTALL 5 FEET OF 2 INCH POLY AND 20 FEET OF 4 INCH POLY AND 1008 FEET OF 6 INCH POLY AND ABANDON 38 FEET OF 12 INCH STEEL ALONG MARTIN LUTHER KING DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 2133 080.64799 9 ABANDON DISTRICT REGULATOR STATION #259 IN UNIVERSITY PARK, DALLAS COUNTY AS PART OF THE AREA REPLACEMENT PROJECT AR ID#1895.1 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER 2134 080.64810 4,452 RELOCATE FACILITIES. INSTALL 275 FEET OF 2 INCH POLY AND ABANDON 8 FEET OF 2 INCH POLY AND 350 FEET OF 4 INCH STEEL ALONG NORTH 7TH STREET TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 2135 080.64825 293,792 INSTALL 3.9 MILES OF 10 INCH STEEL ALONG LINE KP1 AND ABANDON 3.9 MILES OF 10 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY DECEMBER 2136 080.64826 14,965 RELOCATE FACILITIES. INSTALL 817 FEET OF 2 INCH POLY AND ABANDON 802 FEET OF 2 INCH POLY ALONG LAMAR STREET TO ACCOMMODATE CITY OF ROANOKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROANOKE RELOCATION OF FACILITIES OCTOBER 2137 080.64827 575 INSTALL (1) DISTRICT REGULATOR STATION AND ABANDON (1) DISTRICT REGULATOR STATION ALONG 5TH STREET IN THE TOWN OF CLIFTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON SYSTEM INTEGRITY OCTOBER 2138 080.64830 421 INSTALL 79 FEET OF 2 INCH POLY AND 415 FEET OF 4 INCH POLY AND ABANDON 23 FEET OF 2 INCH STEEL AND 52 FEET OF 2 INCH POLY AND 450 FEET OF 4 INCH STEEL ALONG FILLMORE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2139 080.64834 10,074 RELOCATE FACILITIES. INSTALL 2392 FEET OF 2 INCH POLY AND ABANDON 2401 FEET OF 2 INCH POLY AND 14 FEET OF 3 INCH POLY ALONG GARLAND AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2140 080.64838 8,973 INSTALL 7 CLOCK SPRINGS ALONG LINE CA(2ND) IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH PIPELINE INTEGRITY OCTOBER 2141 080.64843 679 INSTALL 975 FEET OF 2 INCH POLY AND ABANDON 1034 FEET OF 2 INCH STEEL AND 5 FEET OF 2 INCH POLY ALONG CHAFFIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY OCTOBER 2142 080.64850 2,917 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION ALONG WALNUT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER 2143 080.64874 774 INSTALL 6200 FEET OF 8 INCH POLY ALONG LONE STAR ROAD. ALL CUSTOMERS MANSFIELD SYSTEM IMPROVEMENT APRIL 2144 080.64876 8,866 INSTALL 1050 FEET OF 4 INCH, 995 FEET OF 2 INCH POLY ALONG WASHINGTON STREET AND ABANDON 1395 FEET OF 6 INCH, 1140 FEET OF 3 INCH STEEL, 33 FEET OF 3 INCH, 15 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY OCTOBER 2145 080.64880 19,712 INSTALL 28 FEET OF 8 INCH STEEL AND 2392 FEET OF 12 INCH STEEL AND ABANDON 2406 FEET OF 8 INCH STEEL ALONG AVENUE E IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 2146 080.64895 113 RELOCATE FACILITIES. INSTALL 40 FEET OF 6 INCH POLY AND ABANDON 35 FEET OF 6 INCH POLY ALONG NORTH JUPITER ROAD TO ACCOMMODATE CITY OF ALLEN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN RELOCATION OF FACILITIES OCTOBER 2147 080.64896 5,994 RELOCATE FACILITIES. INSTALL 595 FEET OF 2 INCH POLY, 86 FEET OF 4 INCH POLY, AND 674 FEET OF 6 INCH POLY AND ABANDON 53 FEET OF 3 INCH STEEL, 580 FEET OF 4 INCH STEEL AND 650 FEET OF 6 INCH STEEL ALONG SALEM COURT TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2148 080.64904 1,563 INSTALL 1900 FEET OF 2 INCH POLY ALONG NORTH GLASS STREET AND ABANDON 1880 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRANKLIN SYSTEM INTEGRITY OCTOBER 2149 080.64905 960,030 INSTALL 5 MILES OF 10 INCH STEEL AND ABANDON 7.3 MILES OF STEEL ALONG LINE B IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 2150 080.64927 549 RELOCATE FACILITIES. INSTALL 279 FEET OF 2 INCH POLY AND ABANDON 203 FEET OF 2 INCH STEEL AND 41 FEET OF 2 INCH POLY ALONG 22ND STREET TO ACCOMMODATE CITY OF PARIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS RELOCATION OF FACILITIES OCTOBER 2151 080.64930 3,788 INSTALL 326 FEET OF 2 INCH POLY AND 1749 FEET OF 4 INCH POLY AND ABANDON 332 FEET OF 2 INCH STEEL AND 85 FEET OF 2 INCH POLY AND 1340 FEET OF 4 INCH STEEL AND 156 FEET OF 4 INCH POLY ALONG FILES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ITASCA SYSTEM INTEGRITY OCTOBER 2152 080.64934 811 RELOCATE FACILITIES. INSTALL 312 FEET OF 2 INCH POLY AND ABANDON 10 FEET OF 3 INCH STEEL AND 310 FEET OF 3 INCH POLY ALONG RUCKER TO ACCOMMODATE CITY OF GRANBURY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY RELOCATION OF FACILITIES OCTOBER 2153 080.64935 (1) ABANDON 473 FEET OF 8 INCH CAST IRON ALONG ELSBETH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2154 080.64937 13,190 INSTALL 2500 FEET OF 4 INCH POLY ALONG SAINT LOUIS AVENUE AND ABANDON 1800 FEET OF 4 INCH STEEL AND 700 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE TEXAS RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2155 080.64940 301 RELOCATE FACILITIES. INSTALL 292 FEET OF 2 INCH POLY AND ABANDON 363 FEET OF 2 INCH STEEL ALONG BARCELONA COURT TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES OCTOBER 2156 080.64943 2,132 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION ALONG ELM STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER 2157 080.64944 150 INSTALL 245 FEET OF 2 INCH POLY ALONG TYLER AND ABANDON 290 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2158 080.64946 2 ABANDON DISTRICT REGULATOR STATION 30 AS PART OF THE AREA REPLACEMENT IN SAN ANGELO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 2159 080.64947 1,956 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION ALONG BRANCH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER 2160 080.64956 (284,202) RELOCATE FACILITIES. INSTALL 1341 FEET OF 6 INCH POLY AND ABANDON 1376 FEET OF 6 INCH POLY ALONG KELLER HICKS ROAD TO ACCOMMODATE TXDOT ROADWAY PROJECT. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES FEBRUARY 2161 080.64959 (1) ABANDON DISTRICT REGULATOR STATION 412 IN FORT WORTH ALONG VAUGHN BOULEVARD. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2162 080.64965 1,109 INSTALL 702 FEET OF 2 INCH POLY AND ABANDON 300 FEET OF 2 INCH STEEL, 209 FEET OF 2 INCH POLY, AND 221 FEET OF 4 INCH STEEL ALONG COMMERCE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY OCTOBER 2163 080.64966 6,901 INSTALL 1926 FEET OF 2 INCH POLY AND ABANDON 1513 FEET OF 2 INCH STEEL, 52 FEET OF 2 INCH POLY, AND 351 FEET OF 4 INCH STEEL ALONG 3RD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER SYSTEM INTEGRITY OCTOBER 2164 080.64967 345 INSTALL 333 FEET OF 2 INCH POLY AND ABANDON 396 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 05 ALONG BURKETT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR SYSTEM INTEGRITY OCTOBER MTX Additions Page 69 of 178 288 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2165 080.64968 733 INSTALL 610 FEET OF 2 INCH POLY AND ABANDON 374 FEET OF 2 INCH STEEL, 368 FEET OF 3 INCH STEEL, AND 1 DISTRICT REGLUATOR STATION ALONG EAST 2ND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR SYSTEM INTEGRITY OCTOBER 2166 080.64969 6,337 INSTALL 3105 FEET OF 2 INCH POLY AND 1062 FEET OF 4 INCH POLY AND ABANDON 88 FEET OF 2 INCH STEEL, 305 FEET OF 2 INCH POLY, 3017 FEET OF 3 INCH STEEL, 350 FEET OF 3 INCH POLY, 404 FEET OF 4 INCH STEEL, AND 256 FEET OF 4 INCH POLY ALONG MARSHALL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKDALE SYSTEM INTEGRITY OCTOBER 2167 080.64979 13 ABANDON DISTRICT REGULATOR STATION #080 IN UNIVERSITY PARK, DALLAS COUNTY AS PART OF THE AREA REPLACEMENT PROJECT AR ID#1944.1 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER 2168 080.64983 2,261 INSTALL REGULATOR AND RELIEF VALVE AND ABANDON REGULATOR AND RELIEF VALVE AT DRS15 ALONG SEARS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER 2169 080.64985 5,189 INSTALL DISTRICT REGULATOR STATION IN SHERMAN (DRS24) AND ABANDON REGULATOR STATION ALONG LAMAR IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER 2170 080.64995 257 INSTALL CLOCKSPRING(S) ON LINE CA(3RD) TO REPAIR DENT WITH METAL LOSS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2171 080.65005 4,454 RELOCATE FACILITIES. INSTALL 580 FEET OF 4 INCH POLY AND ABANDON 570 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 2172 080.65008 76,724 RELOCATE FACILITIES. INSTALL 3710 FEET OF 8 INCH AND ABANDON 898 FEET OF 4 INCH POLY TO ACCOMODATE THE CITY OF HASLET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HASLET RELOCATION OF FACILITIES OCTOBER 2173 080.65015 2,209 INSTALL 507 FEET OF 2 INCH POLY AND ABANDON 514 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 04 ALONG CRABELL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN SYSTEM INTEGRITY OCTOBER 2174 080.65021 838 INSTALL 382 FEET OF 2 INCH POLY AND ABANDON 375 FEET OF 2 INCH POLY ALONG EASTFIELD DRIVE AND YALE BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY OCTOBER 2175 080.65027 116 INSTALL (2) 2 INCH FISHER EZR REGULATORS AND ABANDON (2) 2 INCH FISHER 399 REGULATORS ON STEPHENVILLE DRS6598.1 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY OCTOBER 2176 080.65030 164 INSTALL 5 FEET OF 4 INCH STEEL ALONG BERRY AND PARK HILL BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2177 080.65032 722 INSTALL 640 FEET OF 2 INCH POLY ALONG WEST LOVERS AND ABANDON 400 FEET OF 2 INCH STEEL IS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2178 080.65037 2,823 INSTALL 450 FEET OF 2 INCH POLY ALONG ELM STREET AND ABANDON 130 FEET OF 3 INCH STEEL AND 85 FEET OF 2 INCH POLY AND 230 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER SYSTEM INTEGRITY OCTOBER 2179 080.65038 249 INSTALL 280 FEET OF 2 INCH POLY ALONG PAWNEE PATHWAY AND ABANDON 145 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2180 080.65049 1,837 ABANDON 320 FEET OF 4 INCH STEEL ALONG PALESTINE STREET AND PRARIEVILLE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY OCTOBER 2181 080.65061 1,895 INSTALL 837 FEET OF 2 INCH POLY AND ABANDON 651 FEET OF 2 INCH STEEL AND 171 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION 07 ALONG AVENUE I AND 33RD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER 2182 080.65066 388 INSTALL 272 FEET OF 4 INCH POLY AND ABANDON 317 FEET OF 2 INCH STEEL AND 56 FEET OF 2 INCH POLY AND 281 FEET OF 3 INCH STEEL AND 242 FEET OF 4 INCH STEEL AND 22 FEET OF 4 INCH POLY ALONG8TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2183 080.65082 1,622 INSTALL 252 FEET OF 2 INCH POLY AND 1346 FEET OF 4 INCH POLY AND ABANDON 585 FEET OF 2 INCH POLY AND 260 FEET OF 3 INCH POLY AND 1025 FEET OF 4 INCH STEEL AND 228 FEET OF 4 INCH POLY ALONG WALNUT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY OCTOBER 2184 080.65103 4,391,539 RELOCATE FACILITIES. INSTALL 837 FEET OF 12 INCH AND 881 FEET OF 20 INCH STEEL ALONG MAIN STREET IN FORT WORTH AND ABANDON 269 FEET OF 12 INCH AND 244 FEET OF 18 INCH STEEL TO ACCOMODATE BNSF RAILWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 2185 080.65117 10,640 RELOCATE FACILITIES. INSTALL 27 FEET OF 4 INCH POLY AND 1369 FEET OF 6 INCH POLY AND ABANDON 1317 FEET OF 4 INCH STEEL AND 17 FEET OF 4 INCH POLY AND 45 FEET OF 6 INCH STEEL ALONG AMBLER AVENUE TO ACCOMMODATE CITY OF ABILENE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE RELOCATION OF FACILITIES OCTOBER 2186 080.65124 4,436 INSTALL A 12 INCH STOPPLE AND (3) BALL VALVES AND ABANDON (3) BALL VALVES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 2187 080.65125 32,903 RELOCATE FACILITIES. INSTALL 500 FEET OF 4 INCH POLY ALONG BEAR CREEK PARKWAY AND ABANDON 480 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF KELLER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER RELOCATION OF FACILITIES DECEMBER 2188 080.65131 886 INSTALL A PIG TRAP ON NORTH END OF C22. ALL CUSTOMERS IRVING PIPELINE INTEGRITY DECEMBER 2189 080.65136 1,354 INSTALL 354 FEET OF 4 INCH POLY AND ABANDON 9 FEET OF 2 INCH STEEL AND 538 FEET OF 3 INCH STEEL AND DISTRICT REGULATOR STATION 09 ALONG 17TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER 2190 080.65140 1,638 ABANDON DISTRICT REGULATOR STATION #051 IN DALLAS, DALLAS COUNTY AS PART OF THE AREA REPLACEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2191 080.65141 2,109 INSTALL 620 FEET OF 2 INCH POLY AND ABANDON 312 FEET OF 2 INCH STEEL AND 635 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION 11 ALONG STREETS OF BALLINGER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY OCTOBER 2192 080.65144 84,344 RELOCATE FACILITIES. INSTALL 1459 FEET OF 6 INCH, 382 FEET OF 4 INCH AND 246 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 1715 FEET OF 4 INCH STEEL AND 242 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CROWLEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY RELOCATION OF FACILITIES OCTOBER 2193 080.65145 (7) RELOCATE FACILITIES. ABANDON 225 FEET OF 4 INCH STEEL AND 22 FEET OF 4 INCH POLY ALONG WARREN STREET TO ACCOMMODATE CITY OF BURLESON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON RELOCATION OF FACILITIES OCTOBER 2194 080.65146 2,117 INSTALL 438 FEET OF 2 INCH POLY AND ABANDON 386 FEET OF 2 INCH STEEL AND ABANDON DISTRICT REGULATOR STATION 16 ALONG AVENUE H IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER 2195 080.65156 12,574 INSTALL 266 FEET OF 2 INCH AND 1619 FEET OF 4 INCH POLY AND ABANDON 236 FEET OF 2 INCH AND 1695 FEET OF 3 INCH STEEL AND 118 FEET OF 3 INCH POLY ALONG HALL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FAIRFIELD SYSTEM INTEGRITY OCTOBER 2196 080.65158 726 RELOCATE FACILITIES. INSTALL 436 FEET OF 2 INCH POLY AND ABANDON 362 FEET OF 2 INCH STEEL AND 68 FEET OF 2 INCH POLY ALONG MISTLETOE LANE TO ACCOMMODATE CITY OF PANTEGO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PANTEGO RELOCATION OF FACILITIES OCTOBER MTX Additions Page 70 of 178 289 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2197 080.65159 3,212 INSTALL 1638 FEET OF 2 INCH POLY AND ABANDON 1274 FEET OF 2 INCH STEEL ALONG AUSTIN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE SYSTEM INTEGRITY OCTOBER 2198 080.65161 1,520 INSTALL 620 FEET OF 4 INCH POLY AND ABANDON 620 FEET OF 4 INCH POLY ALONG HIGHWAY 31 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 2199 080.65166 18,108 INSTALL CROWLEY DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY SYSTEM INTEGRITY OCTOBER 2200 080.65168 21,600 INSTALL (108) POLY SERVICES AND ABANDON (108) STEEL SERVICES IN NORTH WEST DALLAS ZONE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2201 080.65169 17,492 INSTALL 1610 FEET OF 8 INCH AND 200 FEET OF 4 INCH POLY ALONG FERGUSON ROAD AND ABANDON 1610 FEET OF 8 INCH, 175 FEET OF 3 INCH AND 25 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2202 080.65180 98,448 RELOCATE FACILITIES. INSTALL 2949 FEET OF 2 INCH AND 374 FEET OF 4 INCH POLY ALONG FM 51 AND ABANDON 1813 FEET OF 2 INCH, 292 FEET OF 4 INCH AND 48 FEET OF 1.25 INCH STEEL AND 305 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF SPRINGTOWN DRAINAGE AND STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SPRINGTOWN RELOCATION OF FACILITIES DECEMBER 2203 080.65204 8,067 RELOCATE FACILITIES. INSTALL 1,246 FEET OF 2 INCH, 250 FEET OF 4 INCH, 473 FEET OF 6 INCH AND 1,397 FEET OF 8 INCH POLY AND ABANDON 687 FEET OF 2 INCH, 1,045 FEET OF 4 INCH, 1,742 FEET OF 6 INCH ALONG MONROE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE RELOCATION OF FACILITIES OCTOBER 2204 080.65215 855 RELOCATE FACILITIES. INSTALL 895 FEET OF 2 INCH POLY AND ABANDON 46 FEET OF 2 INCH STEEL AND 890 FEET OF 3 INCH STEEL AND 10 FEET OF 4 INCH STEEL ALONG CULBERSON TO ACCOMMODATE CITY OF GAINESVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE RELOCATION OF FACILITIES OCTOBER 2205 080.65223 662 RELOCATE FACILITIES. INSTALL 161 FEET OF 2 INCH POLY AND 374 FEET OF 4 INCH POLY AND ABANDON 536 FEET OF 4 INCH STEEL ALONG EAST STREET TO ACCOMMODATE CITY OF BELTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON RELOCATION OF FACILITIES OCTOBER 2206 080.65229 285 INSTALL 323 FEET OF 2 INCH POLY AND ABANDON 311 FEET OF 2 INCH STEEL ALONG HUFF STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2207 080.65242 12,909 RELOCATE FACILITIES. INSTALL 1285 FEET OF 2 INCH AND 138 FEET OF 4 INCH AND 775 FEET OF 6 INCH POLY AND ABANDON 1221 FEET OF 3 INCH AND 125 FEET OF 4 INCH AND 755 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2208 080.65247 366 INSTALL 354 FEET OF 2 INCH POLY AND ABANDON 305 FEET OF 2 INCH STEEL ALONG HAMPTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2209 080.65250 21,014 INSTALL 3295 FEET OF 2 INCH POLY AND ABANDON 3385 FEET OF 2 INCH STEEL ALONG MORGAN MILL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY OCTOBER 2210 080.65258 71,969 INSTALL 2600 FEET OF 2 INCH POLY ALONG 7TH STREET AND ABANDON 720 FEET OF 4 INCH AND 1600 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO SYSTEM INTEGRITY OCTOBER 2211 080.65264 5,666 INSTALL 1407 FEET OF 2 INCH POLY AND 1476 FEET OF 4 INCH POLY AND ABANDON 805 FEET OF 2 INCH STEEL AND 322 FEET OF 2 INCH POLY AND 1402 FEET OF 4 INCH STEEL AND 110 FEET OF 4 INCH POLY AND 6 FEET OF 6 INCH STEEL ALONG 15TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 2212 080.65269 666 INSTALL 300 FEET OF 2 INCH POLY ALONG UNIVERSITY DRIVE AND ABANDON DISTRICT REGULATOR STATION, AND 945 FEET OF 2 INCH STEEL AND 151 FEET OF 2 INCH POLY AND 623 FEET OF 3 INCH STEEL AND 15 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY OCTOBER 2213 080.65274 2,221 RELOCATE FACILITIES. INSTALL 175 FEET OF 4 INCH POLY AND ABANDON 170 FEET OF 4 INCH POLY ALONG SOUTH FIRST STREET TO ACCOMMODATE THE CITY OF GARLAND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER 2214 080.65275 52,062 RELOCATE FACILITIES. INSTALL 2780 FEET OF 4 INCH POLY AND 250 FEET OF 4 INCH STEEL AND 300 FEET OF 2 INCH POLY ALONG SH 205 AND ABANDON 2775 FEET OF 2 INCH POLY TO ACCOMMODATE TXDOT IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAVON RELOCATION OF FACILITIES OCTOBER 2215 080.65287 5,170 RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY AND ABANDON 100 FEET OF 2 INCH POLY ALONG GLENMORE STREET TO ACCOMMODATE THE CITY OF IRVING IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 2216 080.65294 (48,635) INSTALL WELDOVER SLEEVES ON LINE D IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2217 080.65296 637 INSTALL 265 FEET OF 4 INCH POLY ALONG S 23RD AND ABANDON 265 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 2218 080.65299 13,201 RELOCATE FACILITIES. INSTALL 520 FEET OF 4 INCH POLY ALONG BOWMAN SPRINGS AND ABANDON 500 FEET OF 4 INCH POLY AND 60 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF ARLINGTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 2219 080.65301 1,840 RELOCATE FACILITIES. INSTALL 371 FEET OF 2 INCH POLY AND 823 FEET OF 4 INCH POLY AND ABANDON 186 FEET OF 2 INCH STEEL AND 184 FEET OF 2 INCH POLY AND 78 FEET OF 3 INCH STEEL AND 665 FEET OF 4 INCH STEEL AND 92 FEET OF 4 INCH POLY ALONG 38TH STREET TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA RELOCATION OF FACILITIES OCTOBER 2220 080.65302 910 INSTALL 480 FEET OF 4 INCH POLY AND ABANDON 478 FEET OF 4 INCH STEEL ALONG STONEWALL DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER 2221 080.65305 7,344 RELOCATE FACILITIES. INSTALL 215 FEET OF 4 INCH POLY ALONG PRESTON ROAD AND ABANDON 215 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF FRISCO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO RELOCATION OF FACILITIES OCTOBER 2222 080.65306 1,294 INSTALL 633 FEET OF 2 INCH POLY AND ABANDON 693 FEET OF 2 INCH STEEL ALONG LEONA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER 2223 080.65312 451 INSTALL 5185 FEET OF 2 INCH AND 1400 FEET OF 6 INCH POLY ALONG STREETS OF SUNSET CROSSING SUBDIVISION. RESIDENTIAL MANSFIELD GROWTH MARCH 2224 080.65323 33,556 INSTALL 1500 FEET OF 4 INCH POLY AND 4650 FEET OF 2 INCH POLY ALONG STREETS OF FROST FARMS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH OCTOBER 2225 080.65324 7,091 RELOCATE FACILITIES. INSTALL 1160 FEET OF 2 INCH POLY AND ABANDON 50 FEET OF 2 INCH POLY AND 1025 FEET OF 4 INCH STEEL AND 300 FEET OF 4 INCH POLY AND 175 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2226 080.65325 3,054 RELOCATE FACILITIES. INSTALL 494 FEET OF 4 INCH POLY AND 4 FEET OF 8 INCH POLY AND ABANDON 893 FEET OF 4 INCH STEEL AND 50 FEET OF 6 INCH STEEL ALONG AYERS AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER MTX Additions Page 71 of 178 290 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2227 080.65326 1,379 INSTALL 551 FEET OF 4 INCH POLY AND ABANDON 530 FEET OF 4 INCH CAST IRON ALONG GRAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 2228 080.65328 661 INSTALL 688 FEET OF 4 INCH POLY AND ABANDON 678 FEET OF 4 INCH STEEL ALONG 4TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER 2229 080.65329 1,895 RELOCATE FACILITIES. INSTALL 370 FEET OF 2 INCH POLY AND ABANDON 490 FEET OF 2 INCH POLY ALONG VIRGINIA AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2230 080.65332 90,286 RELOCATE FACILITIES. INSTALL 840 FEET OF 12 INCH POLY AND 200 FEET OF 4 INCH POLY AND 20 FEET OF 2 INCH POLY AND 1400 FEET OF 6 INCH POLY AND 925 FEET OF 4 INCH AND 80 FEET OF 2 INCH CAST IRON ALONG WALLACE STREET AND ROSEDALE STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2231 080.65333 (788) INSTALL 68 FEET OF 2 INCH POLY AND 80 FEET OF 3 INCH POLY AND ABANDON 68 FEET OF 2 INCH POLY AND 80 FEET OF 3 INCH STEEL ALONG HEMBRY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY OCTOBER 2232 080.65334 26,185 INSTALL 5500 FEET OF 2 INCH POLY AND 600 FEET OF 4 INCH POLY AND 1600 FEET OF 6 INCH POLY ALONG THE STREETS OF WATERSCAPE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH NOVEMBER 2233 080.65339 (0) ABANDON 10 FEET OF 2 INCH STEEL AND 242 FEET OF 2 INCH POLY AND 699 FEET OF 3 INCH STEEL ALONG THROCKMORTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERENS SYSTEM INTEGRITY OCTOBER 2234 080.65340 94 RELOCATE FACILITIES. INSTALL 83 FEET OF 2 INCH POLY AND ABANDON 77 FEET OF 2 INCH STEEL ALONG LONGVIEW TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES OCTOBER 2235 080.65341 (25) ABANDON 217 FEET OF 2 INCH STEEL AND 84 FEET OF 2 INCH POLY ALONG SCOTT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2236 080.65343 (17) ABANDON 796 FEET OF 2 INCH STEEL ALONG CHAPMAN ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROLLING MEADOWS SYSTEM INTEGRITY OCTOBER 2237 080.65344 520 INSTALL 710 FEET OF 2 INCH POLY AND ABANDON 706 FEET OF 2 INCH STEEL ALONG GUM SPRINGS ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER 2238 080.65347 1,253 INSTALL 40 MOTORIZED REGULATORS AND ABANDON 40 MOTORIZED REGULATORS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2239 080.65356 12,907 INSTALL 1703 FEET OF 10 INCH STEEL AND ABANDON 1670 FEET OF 6 INCH STEEL ALONG THE STREETS OF MAYPEARL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MAYPEARL SYSTEM INTEGRITY OCTOBER 2240 080.65359 3,133 INSTALL 12 FEET OF 3 INCH POLY AND 1012 FEET OF 4 INCH POLY AND ABANDON 998 FEET OF 3 INCH STEEL AND 31 FEET OF 3 INCH POLY ALONG VALWOOD PARKWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY OCTOBER 2241 080.65361 1,239 INSTALL 800 FEET OF 2 INCH POLY AND 6 FEET OF 4 INCH POLY AND ABANDON 428 FEET OF 2 INCH POLY AND 6 FEET OF 4 INCH POLY ALONG WASHINGTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY OCTOBER 2242 080.65364 240 INSTALL 310 FEET OF 4 INCH POLY AND ABANDON 310 FEET OF 4 INCH STEEL ALONG WELSH AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY OCTOBER 2243 080.65367 123,041 INSTALL 1250 FEET OF 8 INCH POLY ALONG STELLA AVENUE AND ABANDON 1180 FEET OF 6 INCH STEEL AND 700 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2244 080.65368 4,456 ABANDON 4282 FEET OF 2 INCH, 18,720 FEET OF 6 INCH STEEL, 151 FEET OF 2 INCH AND 1687 FEET OF 6 INCH POLY ALONG LINE L26 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER 2245 080.65371 21,228 INSTALL 400 FEET OF 4 INCH POLY AND 1150 FEET OF 6 INCH POLY AND ABANDON 260 FEET OF 2 INCH STEEL AND 200 FEET OF 2 INCH POLY AND 1140 FEET OF 6 INCH STEEL ALONG OLIVE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER 2246 080.65374 803 INSTALL 2575 FEET OF 2 INCH AND 2050 FEET OF 6 INCH POLY ALONG STREETS OF SIXTH PHASE OF ARCADIA FARMS. RESIDENTIAL PRINCETON GROWTH MARCH 2247 080.65380 18 ABANDON DISTRICT REGULATOR STATION #82 IN UNIVERSITY PARK, IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER 2248 080.65384 4,994 RELOCATE FACILITIES. INSTALL 2554 FEET OF 2 INCH POLY AND ABANDON 2475 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF RICE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICE RELOCATION OF FACILITIES OCTOBER 2249 080.65386 4,945 INSTALL DEEP WELL GROUND BED AND RECTIFIER AND INSTALL 1 TEST STATION ALONG LINE U13 IN HASKELL COUNTY. ALL CUSTOMERS HASKELL SYSTEM INTEGRITY OCTOBER 2250 080.65390 4,482 RELOCATE FACILITIES. ABANDON 1077 FEET OF 6 INCH STEEL AND 6 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2251 080.65407 10 ABANDON ONE DISTRICT REGULATOR STATION ALONG FAIRMOUNT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2252 080.65415 318 INSTALL 13 FEET OF 6 INCH POLY AND ABANDON 387 FEET OF 3 INCH AND 11 FEET OF 6 INCH STEEL ALONG BROOK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2253 080.65418 28,041 INSTALL 2105 FEET OF 4 INCH AND 3681 FEET OF 2 INCH POLY ALONG THE STREETS OF LARKSPUR PHASE 8. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER 2254 080.65421 409 INSTALL AC VOLTAGE AND LIGHTNING MITIGATION ON LINE DALLAS D TO REDUCE THE AMOUNT OF INDUCED AC TO SAFE LEVELS ON THE PIPELINE. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2255 080.65431 6,464 INSTALL 1555 FEET OF 2 INCH POLY ALONG KIM STREET AND ABANDON 1856 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 2256 080.65436 (10) ABANDON 1629 FEET OF 2 INCH STEEL ALONG MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2257 080.65437 34,635 RELOCATE FACILITIES. INSTALL 1284 FEET OF 2 INCH POLY AND ABANDON 143 FEET OF 2 INCH STEEL AND 1098 FEET OF 2 INCH POLY ALONG JAMES AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2258 080.65443 177,816 RELOCATE FACILITIES. INSTALL 5636 FEET OF 2 INCH POLY AND 1271 FEET OF 4 INCH POLY AND ABANDON 3871 FEET OF 2 INCH STEEL AND 4588 FEET OF 2 INCH POLY AND 1148 FEET OF 3 INCH STEEL AND 102 FEET OF 3 INCH POLY AND 827 FEET OF 4 INCH STEEL AND 183 FEET OF 4 INCH POLY AND 879 FEET OF 8 INCH STEEL ALONG GRAHAM STREET TO ACCOMMODATE CITY OF STEPHENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE RELOCATION OF FACILITIES OCTOBER 2259 080.65444 2,244 INSTALL 903 FEET OF 2 INCH POLY AND ABANDON 903 FEET OF 3 INCH STEEL ALONG WAKE FORREST DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2260 080.65446 1,035 INSTALL 278 FEET OF 2 INCH POLY AND ABANDON 421 FEET OF 2 INCH STEEL AND 440 FEET OF 2 INCH POLY ALONG TOLOSA ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEMP SYSTEM INTEGRITY OCTOBER 2261 080.65451 532 RELOCATE FACILITIES. INSTALL 139 FEET OF 4 INCH POLY AND ABANDON 113 FEET OF 3 INCH STEEL ALONG FM1915 TO ACCOMMODATE CITY OF BUCKHOLTS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BUCKHOLTS RELOCATION OF FACILITIES OCTOBER MTX Additions Page 72 of 178 291 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2262 080.65457 9,588 INSTALL 1371 FEET OF 4 INCH POLY AND 4822 FEET OF 2 INCH POLY ALONG THE STREETS OF WOLF RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH NOVEMBER 2263 080.65461 739 RELOCATE FACILITIES. ABANDON 174 FEET OF 2 INCH STEEL AND 293 FEET OF 2 INCH POLY ALONG 16TH STREET TO ACCOMMODATE CITY OF BROWNWOOD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD RELOCATION OF FACILITIES OCTOBER 2264 080.65462 4,695 INSTALL 831 FEET OF 2 INCH POLY AND ABANDON 450 FEET OF 2 INCH STEEL ALONG NORTH COLLEGE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY OCTOBER 2265 080.65485 4,312 RELOCATE FACILILTIES. INSTALL 950 FEET OF 2 INCH POLY ALONG ALLEY OF LOMA AND ABANDON 940 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER 2266 080.65486 107,444 INSTALL 6850 FEET OF 6 INCH POLY ALONG LONE STAR DRIVE AND ABANDON 330 FEET OF 2 INCH, 6275 FEET OF 3 INCH AND 845 FEET OF 4 INCH IP POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2267 080.65488 24 ABANDON 15 FEET OF 4 INCH STEEL AND 18 FEET OF 6 INCH POLY AND DISTRICT REGULATOR STATION 04 IN BRYAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 2268 080.65496 (5) ABANDON DISTRICT REGULATOR STATION ALONG JIM MILLER AND DAY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2269 080.65498 27,257 INSTALL AND ABANDON S203 DRS IN THE FOLLOWING LOCATIONS: DRS02 AND DRS03 IN PUTNAM IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS PUTNAM SYSTEM INTEGRITY OCTOBER 2270 080.65502 49,693 INSTALL AND ABANDON DISTRICT REGULATOR STATIONS AT DRS08, DRS09, DRS10, DRS11, AND DRS12 IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS DUBLIN SYSTEM INTEGRITY OCTOBER 2271 080.65506 111 ABANDON DISTRICT REGULATOR STATION #119 IN DALLAS, DALLAS COUNTY AS PART OF THE AREA REPLACEMENT PROJECT AR ID#2145.1 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2272 080.65508 17 ABANDON DISTRICT REGULATOR STATION #110 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2273 080.65510 225 INSTALL 296 FEET OF 2 INCH POLY AND ABANDON 219 FEET OF 2 INCH STEEL AND 69 FEET OF 2 INCH POLY ALONG LOCUST STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PETROLIA SYSTEM INTEGRITY OCTOBER 2274 080.65511 1,532 INSTALL 57 FEET OF 16 INCH STEEL AND ABANDON 57 FEET OF 16 INCH STEEL ALONG WEST PIPELINE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY OCTOBER 2275 080.65514 1,689 RELOCATE FACILITIES. INSTALL 333 FEET OF 4 INCH POLY AND ABANDON 140 FEET OF 4 INCH STEEL AND 180 FEET OF 4 INCH POLY ALONG GREEK ROW DRIVE TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 2276 080.65515 21,942 INSTALL AND ABANDON S203 DRS IN THE FOLLOWING LOCATIONS: DRS01 IN SANTA ANNA, DRS01 IN VALERA, DRS01 IN TALPA IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS SANTA ANNA SYSTEM INTEGRITY OCTOBER 2277 080.65516 4,287 INSTALL DISTRICT REGULATOR STATION 012 IN CISCO, 01 IN MORAN, 02 IN CLYDE, 02 IN TRENT AND 02 IN CARBON AND ABANDON DISTRICT REGULATOR STATION 012 IN CISCO, 01 IN MORAN, 02 IN CLYDE, 02 IN TRENT AND 02 IN CARBON IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS CARBON SYSTEM INTEGRITY OCTOBER 2278 080.65517 4,875 RELOCATE FACILITIES. INSTALL 305 FEET OF 4 INCH POLY AND ABANDON 305 FEET OF 4 INCH POLY ALONG WADE BOULEVARD TO ACCOMMODATE CITY OF FRISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO RELOCATION OF FACILITIES OCTOBER 2279 080.65519 22,206 INSTALL AND ABANDON DISTRICT REGLUATOR STATIONS: DRS02 IN IREDELL, DRS09 IN HAMILTON AND DRS04 IN COMANCHE IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS HAMILTON SYSTEM INTEGRITY OCTOBER 2280 080.65527 66,172 RELOCATE FACILITIES. INSTALL 860 FEET OF 8 INCH, ALONG GREAT OAKS STREET AND ABANDON 644 FEET OF 8 INCH POLY AND 225 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF BRUSHY CREEK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRUSHY CREEK RELOCATION OF FACILITIES OCTOBER 2281 080.65529 7,656 INSTALL AND ABANDON DRS IN THE FOLLOWING LOCATION: DRS13 IN COLORADO CITY IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS COLORADO CITY SYSTEM INTEGRITY OCTOBER 2282 080.65530 18,966 INSTALL AND ABANDON S203 DRS IN THE FOLLOWING LOCATIONS: DRS11 IN STAMFORD AND DRS03 IN LUEDERS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY OCTOBER 2283 080.65534 118,735 RELOCATE FACILITIES. INSTALL 2717 FEET OF 4 INCH POLY AND ABANDON 3111 FEET OF 2 INCH POLY ALONG HIDDEN CREEK ROAD AND MERRYMOUNT ROAD TO ACCOMMODATE CITY OF WESTOVER HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTOVER HILLS RELOCATION OF FACILITIES OCTOBER 2284 080.65542 174 INSTALL FLOW SAFE RELIEF VALVE AT REGULATOR STATION IN SUNNYVALE AND ABANDON ONE GROVE 83 RELIEF VALVES AT DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS SUNNYVALE SYSTEM INTEGRITY OCTOBER 2285 080.65545 13,346 INSTALL 125 FEET OF 2 INCH POLY AND 500 FEET OF 6 INCH POLY AND ABANDON 100 FEET OF 2 INCH STEEL AND 44 FEET OF 2 INCH POLY AND 397 FEET OF 6 INCH POLY ALONG HARVEY ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY OCTOBER 2286 080.65546 6,411 INSTALL 2100 FEET OF 4 INCH POLY ALONG DENNIS LANE AND ABANDON 1785 FEET OF 4 INCH STEEL AND 315 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY OCTOBER 2287 080.65548 386 RELOCATE FACILITIES. INSTALL 404 FEET OF 2 INCH POLY AND ABANDON 404 FEET OF 2 INCH POLY ALONG FOREST PARK BOULEVARD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2288 080.65551 3,803 RELOCATE FACILITIES. INSTALL 750 FEET OF 2, 4, AND 6 INCH POLY ALONG DOVER LANE AND ABANDON 750 FEET OF 2, 4, AND 6 INCH POLY TO ACCOMMODATE RICHLAND HILLS STREET PAVING PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS RELOCATION OF FACILITIES OCTOBER 2289 080.65558 (19,718) INSTALL RELIEF VALVE AND ABANDON RELIEF VALVE ALONG JACKSON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 2290 080.65563 533 RELOCATE FACILITIES. INSTALL 310 FEET OF 2 INCH POLY AND ABANDON 445 FEET OF 2 INCH POLY ALONG BRIDGE STREET TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 2291 080.65564 44,129 INSTALL 1397 FEET OF 4 INCH POLY AND ABANDON 978 FEET OF 4 INCH STEEL AND 178 FEET OF 4 INCH POLY AND 11 FEET OF 6 INCH STEEL ALONG MODLIN AVENUE AND MATTISON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2292 080.65565 202,995 FUNCTIONAL PROJECT COVERING THE REPLACEMENT OF MAINS AND SERVICE LINES IN CISCO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY OCTOBER 2293 080.65570 2,200 INSTALL 268 FEET OF 6 INCH STEEL AND ABANDON 246 FEET OF 6 INCH STEEL ALONG ROGERS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROGERS SYSTEM INTEGRITY OCTOBER 2294 080.65582 14 INSTALL 270 FEET OF 2 INCH POLY AND ABANDON 270 FEET OF 2 INCH STEEL AND 184 FEET OF 2 INCH POLY ALONG JACKSBORO HIGHWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER MTX Additions Page 73 of 178 292 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2295 080.65588 155 ABANDON 257 FEET OF STEEL AND 25 FEET OF POLY AND DISTRICT REGULATOR STATION ALONG AVENUE C IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KILLEEN SYSTEM INTEGRITY OCTOBER 2296 080.65593 51,242 INSTALL REGULATOR AND RELIEF VALVE ALONG DRS324 AND ABANDON REGULATOR AND RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2297 080.65620 3,848 RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY AND ABANDON 400 FEET OF 4 INCH POLY ALONG FM 1417 AT SFBN CROSSING TO ACCOMMODATE THE CITY OF SHERMAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES OCTOBER 2298 080.65621 7,390 RELOCATE FACILITIES. INSTALL 408 FEET OF 8 INCH STEEL AND ABANDON 375 FEET OF 8 INCH STEEL ALONG US 75 AT BNSF CROSSING TO ACCOMMODATE CITY OF SHERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES OCTOBER 2299 080.65627 15,798 INSTALL DISTRICT REGULATOR STATION IN MOODY AND ABANDON DISTRICT REGULATOR STATION DRS03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MOODY SYSTEM INTEGRITY OCTOBER 2300 080.65642 11,224 INSTALL AND ABANDON S203 DRS IN THE FOLLOWING LOCATIONS: DRS01 & DRS02 IN BELLEVUE, DRS01 IN OKLAUNION, DRS10 IN PETROLIA, AND DRS09 IN ELECTRA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELLEVUE SYSTEM INTEGRITY OCTOBER 2301 080.65644 20,165 RELOCATE FACILITIES. INSTALL 118 FEET OF 4 INCH POLY AND 663 FEET OF 6 INCH POLY AND ABANDON 118 FEET OF 4 INCH POLY AND 663 FEET OF 6 INCH POLY ALONG HOLLAND ROAD TO ACCOMMODATE CITY OF MANSFIELD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD RELOCATION OF FACILITIES OCTOBER 2302 080.65646 30,883 RELOCATE FACILITIES. INSTALL 1084 FEET OF 4 INCH POLY AND 367 FEET OF 6 INCH POLY AND ABANDON 155 FEET OF 4 INCH STEEL AND 1199 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF TERRELL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL RELOCATION OF FACILITIES OCTOBER 2303 080.65647 6,275 INSTALL 230 FEET OF 2 INCH POLY AND 25 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION AND 200 FEET OF 3 INCH STEEL ALONG ELM STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ECTOR SYSTEM INTEGRITY OCTOBER 2304 080.65651 4,600 INSTALL AND ABANDON S203 DRS IN THE FOLLOWING LOCATIONS: DRS03 IN WHITEWRIGHT, DRS02 IN LINDSAY, AND DRS10 IN GAINESVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LINDSAY SYSTEM INTEGRITY OCTOBER 2305 080.65653 9,858 INSTALL AND ABANDON DISTRICT REGLUATOR STATIONS AT THE FOLLOWING LOCATIONS: DRS045 AND DRS084 IN WICHITA FALLS, DRS33 IN OLNEY, AND DRS01 AND DRS08 IN ARCHER CITY. IN ACCORDANCE WITH THE TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2306 080.65655 16,049 INSTALL DISTRICT REGULATOR STATION 01 AND 03 IN CADDO MILLS, 11 IN SULPHUR SPRINGS AND 01 IN CUMBY IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS CUMBY SYSTEM INTEGRITY OCTOBER 2307 080.65657 1,147 INSTALL 3875 FEET OF 2 INCH POLY AND 3020 FEET OF 4 INCH POLY ALONG THE STREETS OF THE MILRANY RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH MARCH 2308 080.65659 508 INSTALL 4530 FEET OF 2 INCH POLY ALONG THE STREETS OF ANNA CROSSING SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ANNA GROWTH MARCH 2309 080.65660 32 INSTALL 4195 FEET OF 2 INCH POLY ALONG STREETS OF TOWN PARK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PRINCETON GROWTH MARCH 2310 080.65661 86,148 RELOCATE FACILITIES. INSTALL 2945 FEET OF 2 INCH POLY AND ABANDON 2970 FEET OF 2 INCH STEEL ALONG MINOT AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2311 080.65672 712 INSTALL 283 FEET OF 4 INCH POLY AND ABANDON 190 FEET OF 2 INCH STEEL AND 110 FEET OF 2 INCH POLY AND 260 FEET OF 4 INCH STEEL AND 20 FEET OF 4 INCH POLY ALONG ROBERTS ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2312 080.65673 211 ABANDON 3315 FEET OF 3 INCH POLY ALONG COLLIN CREEK MALL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY OCTOBER 2313 080.65674 246,606 INSTALL TWO NEW LOW PRESSURE DISTRICT REGULATOR STATIONS, 25 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATIONS FARMERSVILLE DISTRICT REGULATOR STATIONS 11 AND 12, 22 FEET OF 2 INCH STEEL , 13 FEET OF 4 INCH STEEL 10 FEET OF 4 INCH POLY AND 13 FEET OF 4 INCH STEEL MAIN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY JUNE 2314 080.65678 7,460 INSTALL AND ABANDON S203 DISTRICT REGULATOR STATION IN MILFORD TEXAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILFORD SYSTEM INTEGRITY OCTOBER 2315 080.65679 15,821 INSTALL AND ABANDON S203 DISTRICT REGULATOR STATION DRS06 IN MERIDIAN IN ACCORDANCE WITH THE TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS MERIDIAN SYSTEM INTEGRITY OCTOBER 2316 080.65681 53,398 RELOCATE FACILITIES. INSTALL 160 FEET OF 8 INCH STEEL AND 430 FEET OF 2 INCH POLY ALONG NORTHAVEN ROAD AND ABANDON 113 FEET OF 8 INCH STEEL AND 415 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2317 080.65682 35 ABANDON DISTRICT REGULATOR STATION 168 IN FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2318 080.65683 720 INSTALL 602 FEET OF 2 INCH POLY AND ABANDON 80 FEET OF 4 INCH STEEL AND 300 FEET OF 4 INCH POLY ALONG LOVERS LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE SYSTEM INTEGRITY OCTOBER 2319 080.65690 7,650 INSTALL AND ABANDON DISTRICT REGULATOR STATIONS AT THE FOLLOWING LOCATIONS: DRS33 IN TEMPLE IN ACCORDANCE WITH THE TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER 2320 080.65694 2,746 RELOCATE FACILITIES. INSTALL 10 FEET OF 2 INCH POLY AND 710 FEET OF 4 INCH POLY AND ABANDON 10 FEET OF 2 INCH POLY AND 10 FEET OF 4 INCH STEEL AND 700 FEET OF 4 INCH POLY ALONG CARDINAL LANE TO ACCOMMODATE CITY OF NORTH RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTH RICHLAND HILLS RELOCATION OF FACILITIES OCTOBER 2321 080.65695 2,892 RELOCATE FACILITIES. INSTALL 35 FEET OF 4 INCH POLY AND 135 FEET OF 6 INCH AND ABANDON 45 FEET OF 4 INCH POLY 30 FEET OF 4 INCH AND 160 FEET OF 6 INCH STEEL ALONG WEST BROADWAY AVENUE AT TRAVIS AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2322 080.65697 (8,556) REPLACE (4) DISTRICT REGUATOR STATIONS IN SAGINAW IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY OCTOBER 2323 080.65704 494,776 INSTALL NEVADA DISTRICT REGULATOR STATION #2, FATE DISTRICT REGULATOR STATION #1 AND FORNEY DISTRICT REGULATOR STATION #6. REPLACE NEVADA DISTRICT REGULATOR STATION #2, FATE DISTRICT REGULATOR STATION #1 AND FORNEY DISTRICT REGULATOR STATION #6 ALL CUSTOMERS NEVADA SYSTEM INTEGRITY JULY 2324 080.65705 204 RELOCATE FACILITIES. INSTALL 118 FEET OF 6 INCH POLY AND ABANDON 89 FEET OF 6 INCH POLY ALONG OLD BURLESON ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2325 080.65706 13,575 RELOCATE FACILITIES. INSTALL 600 FEET OF 6 INCH POLY AND ABANDON 350 FEET OF 6 INCH STEEL ALONG RISINGER ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER MTX Additions Page 74 of 178 293 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2326 080.65707 102,063 RELOCATE FACILITIES. INSTALL 455 FEET OF 6 INCH AND 2260 FEET OF 12 INCH POLY ALONG RISINGER ROAD FROM INTERSTSTE 35W TO TECHNOLOGY BOULEVARD AND ABANDON 132 FEET OF 6 INCH STEEL AND 2062 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2327 080.65731 267 ABANDON 361 FEET OF 2 INCH STEEL AND 40 FEET OF 2 INCH POLY ALONG CHAPPELL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NEWCASTLE SYSTEM INTEGRITY OCTOBER 2328 080.65744 867,349 INSTALL DISTRICT REGULATOR STATIONS #010, #011, #017, AND #067A ALONG THE STREETS OF ABILENE AND ABANDON DISTRICT REGULATOR STATIONS #010, #011, #017, AND #067A. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 2329 080.65747 6,003 INSTALL 925 FEET OF 4 INCH POLY ALONG NORTH STREET AND ABANDON 925 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.208. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER 2330 080.65749 47,385 INSTALL 3 FEET OF 3 INCH POLY AND 1236 FEET OF 4 INCH POLY AND ABANDON 1130 FEET OF 4 INCH POLY ALONG LINDALE LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY OCTOBER 2331 080.65754 10,618 RELOCATE FACILITIES. INSTALL 2750 FEET OF 2 INCH POLY AND ABANDON 1217 FEET OF 2 INCH STEEL, 444 FEET OF 2 INCH POLY, 782 FEET OF 1.25 INCH STEEL, AND 585 FEET OF 3 INCH STEEL AND 1 DRS ALONG WAYLAND AND SUNSET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER RELOCATION OF FACILITIES OCTOBER 2332 080.65774 409 RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY AND ABANDON 350 FEET OF 4 INCH STEEL ALONG NORTH COLEMAN TO ACCOMMODATE CITY OF PROSPER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PROSPER RELOCATION OF FACILITIES OCTOBER 2333 080.65779 1,736 INSTALL 840 FEET OF 4 INCH AND 2400 FEET OF 2 INCH POLY ALONG THE STREETS OF THE STANDARD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH JULY 2334 080.65786 232 INSTALL 990 FEET OF 8 INCH, 820 FEET OF 4 INCH, AND 6230 FEET OF 2 INCH POLY ALONG THE STREETS OF CARMEL SUBDIVISON. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH MARCH 2335 080.65787 8,169 RELOCATE FACILITIES. INSTALL 780 FEET OF 4 INCH AND 37 FEET OF 6 INCH POLY AND ABANDON 221 FEET OF 2 INCH STEEL, 287 FEET OF 2 INCH POLY, 268 FEET OF 3 INCH POLY AND 20 FEET OF 6 INCH POLY ALONG SOUTH BOUND FRONTAGE OF IH35 TO ACCOMMODATE TXDOT PROJECT. ALL CUSTOMERS GEORGETOWN RELOCATION OF FACILITIES APRIL 2336 080.65795 139,277 INSTALL 1500 FEET OF 2 INCH; POLY ALONG IOOF STREET AND ABANDON 1020 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY JULY 2337 080.65802 25,309 INSTALL DISTRICT REGULATOR STATION 05 ALONG THE STREETS OF BROWNWOOD AND ABANDON DISTRICT REGULATOR 02 AND DISTRICT REGULATOR STATION 05 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER 2338 080.65803 6,298 INSTALL DISTRICT REGULATOR STATION 02 AND ABANDON DISTRICT REGULATOR STATION 02 ALONG ATCHILEY STREET IN THE TOWN OF ALVARADO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALVARADO SYSTEM INTEGRITY OCTOBER 2339 080.65804 51,099 INSTALL DISTRICT REGULATOR STATION IN CLEBURNE AND ABANDON DISTRICT REGULATOR STATION 06, 09, 26, 13, 05, 17 IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER 2340 080.65805 449,815 INSTALL WESTMINISTER DISTRICT REGULATOR STATION # 1, ANNA DISTRICT REGULATOR STATION #3, ANNA DISTRICT REGULATOR STATION #5, 30 FEET OF 2 INCH POLY, 70 FEET OF 4 INCH POLY AND ABANDON WESTMINISTER DISTRICT REGULATOR STATION #1, ANNA DISTRICT REGULATOR STATION #3, ANNA DISTRICT REGULATOR STATION #5, 28 FEET OF 2 INCH STEEL, 10 FEET OF 3 INCH STEEL, 19 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANNA SYSTEM INTEGRITY SEPTEMBER 2341 080.65806 12,122 INSTALL DISTRICT REGULATOR STATION IN AND CORSICANA AND ABANDON DISTRICT REGULATOR STATION DRS07 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 2342 080.65807 45,513 INSTALL DISTRICT REGULATOR STATIONS 01,02,03,10 AND ABANDON FOUR DISTRICT REGULATOR STATIONS 01,02,03,10 ALONG THE STREETS OF PALESTINE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE SYSTEM INTEGRITY OCTOBER 2343 080.65810 23,688 INSTALL AND ABANDON DISTRICT REGULATOR STATIONS #01, #05,#12,#25 AND #26 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 2344 080.65812 14,176 INSTALL DISTRICT REGULATOR STATIONS DRS29, DRS47, DRS50,DRS03 AND DRS16 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY OCTOBER 2345 080.65813 8,887 INSTALL DISTRICT REGULATOR STATION IN CHILDRESS AND QUANAH AND ABANDON DISTRICT REGULATOR STATION DRS03, DRS08, DRS06,DRS12 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER 2346 080.65815 7,549 INSTALL DISTRICT REGULATOR STATION IN WICHITA AND ABANDON DISTRICT REGULATOR STATION DRS08, DRS66, DRS007 AND DRS121 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2347 080.65816 25,885 INSTALL (4) DISTRICT REGULATOR STATION ALONG STREETS OF CLARKSVILLE AND 300 FEET OF 4 INCH POLY, 100 FEET OF 2 INCH POLY AND ABANDON 45 FEET OF 3 INCH, 25 FEET OF 3 INCH, 30 FEET OF 4 INCH STEEL, 25 FEET OF 4 INCH POLY, 25 FEET OF 4 INCH STEEL, 10 FEET OF 3 INCH STEEL, DRS 01, 06, 08, AND 10 IN CLARKSVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLARKSVILLE SYSTEM INTEGRITY OCTOBER 2348 080.65817 12,769 INSTALL DISTRICT REGULATOR STATIONS ALONG THE STREETS OF COLORADO CITY AND ABANDON DISTRICT REGULATOR STATIONS 02, 03, 10 AND 11 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLORADO CITY SYSTEM INTEGRITY OCTOBER 2349 080.65818 19,858 INSTALL DISTRICT REGULATOR STATION IN COMMERCE AND GREENVILLE AND ABANDON DISTRICT REGULATOR STATION 01, 02, 04, 05 AND 06 IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY OCTOBER 2350 080.65819 14,340 INSTALL DISTRICT REGULATOR STATION IN GREENVILLE AND ABANDON DISTRICT REGULATOR STATION 08, 09, 25, 28 IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY OCTOBER 2351 080.65820 68,846 INSTALL DISTRICT REGULATOR STATION, 422 FEET OF 2 INCH POLY, AND 708 FEET OF 4 INCH POLY IN SULPHUR SPRINGS AND ABANDON DISTRICT REGULATOR STATION 03, 09, 13 AND 14 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY OCTOBER 2352 080.65821 295,680 INSTALL DISTRICT REGULATOR STATION 07, 11 12 AND ABANDON DISTRICT REGULATOR STATION 07, 11, 12 ALONG THE STREETS OF DENTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER 2353 080.65825 9,691 INSTALL 885 FEET OF 4 INCH AND 2133 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK PHASE 12. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER 2354 080.65826 107,948 INSTALL 3030 FEET OF 2 INCH POLY ALONG DIVIDEND DRIVE AND ABANDON 3020 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 2355 080.65829 12,374 RELOCATE FACILITIES. INSTALL 900 FEET OF 4 INCH POLY AND ABANDON 890 FEET OF 4 INCH STEEL ALONG HOWARD ST TO ACCOMMODATE THE CITY OF ROYSE CITY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROYSE CITY RELOCATION OF FACILITIES OCTOBER 2356 080.65830 481 RELOCATE FACILITIES. INSTALL 280 FEET OF 4 INCH POLY AND ABANDON 42 FEET OF 4 INCH STEEL AND 220 FEET OF 4 INCH POLY ALONG CLARKSVILLE TO ACCOMMODATE CITY OF PARIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS RELOCATION OF FACILITIES OCTOBER MTX Additions Page 75 of 178 294 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2357 080.65838 4,131 RELOCATE FACILITIES. INSTALL 504 FEET OF 2 INCH POLY AND 114 FEET OF 4 INCH POLY AND ABANDON 469 FEET OF 2 INCH STEEL AND 16 FEET OF 2 INCH POLY AND 15 FEET OF 4 INCH STEEL AND 85 FEET OF 4 INCH POLY ALONG CURZON AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2358 080.65841 6,100 INSTALL DISTRICT REGULATOR STATION IN GLEN ROSE AND ABANDON DISTRICT REGULATOR STATION DRS07 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLEN ROSE SYSTEM INTEGRITY OCTOBER 2359 080.65842 351,845 INSTALL DISTRICT REGULATOR STATION IN GRAPEVINE AND ABANDON DISTRICT REGULATOR STATION #01, #04, AND #07. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER 2360 080.65844 10,132 INSTALL DISTRICT REGULATOR STATION 02 IN MOODY AND HUTTO AND ABANDON DISTRICT REGULATOR STATION 02 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HUTTO SYSTEM INTEGRITY OCTOBER 2361 080.65845 1,488 RELOCATE FACILITIES. INSTALL 75 FEET OF 4 INCH AND 75 FEET OF 2 INCH POLY ALONG FM 1633 AND ABANDON 75 FEET OF 4 INCH STEEL AND 75 FEET OF 2 INCH POLY TO ACCOMMODATE TXDOT ROAD IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA RELOCATION OF FACILITIES OCTOBER 2362 080.65851 118,141 INSTALL 1450 FEET OF 4 INCH AND 950 FEET OF 2 INCH POLY AND ABANDON 1700 FEET OF 4 INCH AND 700 FEET OF 2 INCH STEEL ALONG SMITH STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY OCTOBER 2363 080.65852 1,895 INSTALL DISTRICT REGULATOR STATION 06 AND ABANDON DISTRICT REGULATOR STATION 06 ALONG MESQUITE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA SYSTEM INTEGRITY OCTOBER 2364 080.65853 6,736 INSTALL AND ABANDON DISTRICT REGULATOR 02 IN MART. ALL CUSTOMERS MART SYSTEM INTEGRITY OCTOBER 2365 080.65854 5,976 INSTALL DISTRICT REGULATOR STATION 12 IN WACO AND ABANDON DISTRICT REGULATOR STATION 12 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 2366 080.65857 13,524 INSTALL DISTRICT REGULATOR STATION 18 IN WACO AND ABANDON DISTRICT REGULATOR STATION 18 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 2367 080.65858 543,218 INSTALL DISTRICT REGULATOR STATION #04, #11, #13. #14 ALONG THE STREETS OF SAN ANGELO AND ABANDON DISTRICT REGULATOR STATION #04, #11, #13. #14 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY JUNE 2368 080.65859 551 INSTALL 293 FEET OF 4 INCH POLY AND ABANDON 33 FEET OF 2 INCH STEEL AND 215 FEET OF 2 INCH POLY AND 249 FEET OF 4 INCH STEEL AND 38 FEET OF 4 INCH POLY ALONG BUCHANAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2369 080.65862 525,309 INSTALL DISTRICT REGULATOR STATION #15, #43, #52. #62, #81 ALONG THE STREETS OF SAN ANGELO AND ABANDON DISTRICT REGULATOR STATION #15, #43, #52. #62, #81 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY SEPTEMBER 2370 080.65863 15,290 INSTALL DISTRICT REGULATOR STATIONS 55, 10, 16, 09, 46 AND ABANDON DISTRICT REGULATOR STATIONS 55, 10, 16, 09, 46 ALONG THE STREETS OF SAN ANGELO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 2371 080.65865 175,054 INSTALL DISTRICT REGULATOR STATION #20 AND 270 FEET OF 4 INCH POLY ALONG CHURCH STREET AND ABANDON DISTRICT REGULATOR STATION #20 AND 260 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY JULY 2372 080.65877 48 ABANDON DISTRICT REGULATOR STATION 104 IN FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2373 080.65879 81,762 RELOCATE FACILITIES. INSTALL 2200 FEET OF 4 INCH AND 350 FEET OF 2 INCH POLY ALONG SH78 AND ABANDON 1190 FEET OF 4 INCH AND 780 FEET OF 6 INCH STEEL TO ACCOMMODATE TXDOT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2374 080.65885 128,243 INSTALL 1658 FEET OF 8 INCH POLY AND ABANDON 1344 FEET OF 3 INCH STEEL AND REPLACE DISTRICT REGULATOR STATION ALONG BRUCE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GODLEY SYSTEM INTEGRITY DECEMBER 2375 080.65887 6,853 INSTALL 280 FEET OF 2 INCH POLY AND 1050 FEET OF 4 INCH POLY AND ABANDON 166 FEET OF 2 INCH POLY AND 558 FEET OF 4 INCH STEEL AND 80 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND SYSTEM INTEGRITY OCTOBER 2376 080.65896 1,204 ABANDON DISTRICT REGULATOR STATION 01 AND 346 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY OCTOBER 2377 080.65901 14,697 RELOCATE FACILITIES. INSTALL 953 FEET OF 2 INCH POLY AND 4 FEET OF 4 INCH POLY AND ABANDON 955 FEET OF 2 INCH STEEL ALONG ALTA VIEW STREET FROM KIMBO RD TO PREMIER STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2378 080.65902 22,149 RELOCATE FACILITIES. INSTALL 2395 FEET OF 2 INCH POLY AND ABANDON 1410 FEET OF 2 INCH STEEL ALONG KIMBO ROAD FROM MESQUITE RD TO EAST END CUL DE SAC TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2379 080.65904 654 INSTALL 65 FEET OF 4 INCH AND 245 FEET OF 6 INCH POLY ALONG WEST AVENUE B AND ABANDON 65 FEET OF 3 INCH AND 200 FEET OF 6 INCH STEEL AND 40 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER 2380 080.65910 1,552 INSTALL 279 FEET OF 2 INCH POLY AND 251 FEET OF 4 INCH POLY AND ABANDON 279 FEET OF 2 INCH STEEL AND 177 FEET OF 3 INCH STEEL AND 70 FEET OF 4 INCH STEEL ALONG CYPRESS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GROESBECK SYSTEM INTEGRITY OCTOBER 2381 080.65917 358 INSTALL 224 FEET OF 2 INCH POLY AND ABANDON 224 FEET OF 2 INCH POLY ALONG WOODBINE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND SYSTEM INTEGRITY OCTOBER 2382 080.65918 9,751 RELOCATE FACILITIES. INSTALL 1,070 FEET OF 2 INCH POLY ALONG HOUSTON (FM 56) MAXEY AND ABANDON 260 FEET OF 4 INCH AND 600 FEET OF 2 INCH STEEL AND 417 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES OCTOBER 2383 080.65919 12,716 RELOCATE FACILITIES. INSTALL 120 FEET OF 4 INCH POLY AND ABANDON 260 FEET OF 2 INCH POLY ALONG HAIRY MAN ROAD TO ACCOMMODATE CITY OF ROUND ROCK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK RELOCATION OF FACILITIES OCTOBER 2384 080.65921 14,989 INSTALL 3004 FEET OF 2 INCH POLY AND ABANDON 2171 FEET OF 2 INCH STEEL AND 339 FEET OF 2 INCH POLY AND 190 FEET OF 6 INCH STEEL AND 63 FEET OF 6 INCH POLY ALONG SOUTH 20TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 2385 080.65930 1,438 INSTALL 260 FEET OF 4 INCH POLY AND 2 FEET OF 6 INCH POLY AND ABANDON 131 FEET OF 2 INCH STEEL AND 8 FEET OF 6 INCH POLY AND 155 FEET OF 8 INCH STEEL ALONG MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2386 080.65955 215 ABANDON (1) DISTRICT REGULATOR STATION ALONG KNOX ST STREET IN THE TOWN OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2387 080.65956 42,435 RELOCATE FACILITIES. INSTALL 1721 FEET OF 4 INCH POLY AND ABANDON 197 FEET OF 3 INCH STEEL AND 1621 FEET OF 4 INCH STEEL ALONG PARK HILL DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2388 080.65962 455 INSTALL (2) CLOCKSPRINGS AT DFW AIRPORT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY OCTOBER MTX Additions Page 76 of 178 295 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2389 080.65968 78,409 RELOCATE FACILITIES. INSTALL 498 FEET OF 6 INCH POLY AND 229 FEET OF 4 INCH POLY AND ABANDON 503 FEET OF 6 INCH POLY AND 195 FEET OF 3 INCH POLY ALONG HIGHWAY I35 AND NORTHWEST BLVD TO ACCOMMODATE CITY OF GEORGETOWN STREET IMPROVEMENT PROJECT. ALL CUSTOMERS GEORGETOWN RELOCATION OF FACILITIES JULY 2390 080.65973 38,714 RELOCATE FACILITES. INSTALL 1198 FEET OF 12 INCH POLY AND ABANDON 1230 FEET OF 12 INCH POLY ALONG FRONTIER PARKWAY TO ACCOMMODATE THE CITY OF CELINA IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA RELOCATION OF FACILITIES OCTOBER 2391 080.66000 17,136 INSTALL 1000 FEET OF 12 INCH POLY AND ABANDON 1040 FEET OF 12 INCH STEEL ALONG WASHINGTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2392 080.66002 14,312 RELOCATE FACILITIES. INSTALL 424 FEET OF 4 INCH POLY AND ABANDON 176 FEET OF 4 INCH STEEL AND 239 FEET OF 4 INCH POLY TO ACCOMMODATE HEB CONSTRUCTION PROJECT. ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES FEBRUARY 2393 080.66007 416 RELOCATE FACILITIES. INSTALL 72 FEET OF 2 INCH POLY AND ABANDON 70 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF WHITEHOUSE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITEHOUSE RELOCATION OF FACILITIES OCTOBER 2394 080.66011 1,928 INSTALL 490 FEET OF 2 INCH POLY AND ABANDON 491 FEET OF 2 INCH STEEL ALONG OLD HICO ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY OCTOBER 2395 080.66012 4,770 INSTALL 8 INCH RELIEF VALVE IN IRVING AT DRS 4549.1 AND RETIRE RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER 2396 080.66014 1,776 INSTALL 506 FEET OF 4 INCH POLY AND ABANDON 484 FEET OF 2 INCH STEEL AND 11 FEET OF 3 INCH STEEL ALONG PARRISH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 2397 080.66016 632 INSTALL 87 FEET OF 6 INCH STEEL AND ABANDON 88 FEET OF 6 INCH STEEL ALONG LINE U IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY OCTOBER 2398 080.66017 4,852 RELOCATE FACILITIES. INSTALL 1165 FEET OF 2 INCH POLY ALONG HAMILTON STREET AND ABANDON 796 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF FARMERSVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE RELOCATION OF FACILITIES OCTOBER 2399 080.66023 1,736 RELOCATE FACILITIES. INSTALL 550 FEET OF 4 INCH POLY ALONG LEON AND ABANDON 570 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER 2400 080.66029 2,788 INSTALL 500 FEET OF 4 INCH POLY AND ABANDON 500 FEET OF 4 INCH STEEL ALONG SOUTH GARITTY STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FROST SYSTEM INTEGRITY OCTOBER 2401 080.66030 5,688 INSTALL 151 FEET OF 3 INCH POLY AND 620 FEET OF 4 INCH POLY AND ABANDON 150 FEET OF 3 INCH POLY AND 613 FEET OF 4 INCH POLY ALONG MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY OCTOBER 2402 080.66031 1,514 RELOCATE FACILITIES. INSTALL 90 FEET OF 2 INCH POLY ALONG HUDNALL FARMS AND ABANDON 80 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF KELLER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER RELOCATION OF FACILITIES OCTOBER 2403 080.66032 5,935 RELOCATE FACILITIES. INSTALL 80 FEET OF 2 INCH POLY ALONG LOST LAKE DRIVE AND ABANDON 70 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF KELLER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER RELOCATION OF FACILITIES OCTOBER 2404 080.66034 19,497 RELOCATE FACILITIES. INSTALL 11 FEET OF 4 INCH POLY AND 3963 FEET OF 6 INCH POLY AND ABANDON 2480 FEET OF 4 INCH POLY ALONG REEDER ROAD TO ACCOMMODATE CITY OF FORNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORNEY RELOCATION OF FACILITIES OCTOBER 2405 080.66035 1,069 INSTALL RELIEF VALVE AND ABANDON RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER 2406 080.66037 13,305 INSTALL 165 FEET OF 8 INCH STEEL AND ABANDON 165 FEET OF 8 INCH STEEL ALONG HIGHWAY 222 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MUNDAY SYSTEM INTEGRITY OCTOBER 2407 080.66038 3,758 INSTALL 540 FEET OF 2 INCH POLY ALONG RIVER AND ABANDON 530 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEYMOUR SYSTEM INTEGRITY OCTOBER 2408 080.66041 28,528 INSTALL 767 FEET OF 2 INCH POLY ALONG SOUTH 9TH STREET AND ABANDON 920 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 2409 080.66044 500,164 RELOCATE FACILITIES. INSTALL 1000 FEET OF 30 INCH STEEL ALONG CANADA DRIVE AND ABANDON 850 FEET OF 30 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES DECEMBER 2410 080.66058 18,782 INSTALL 1475 FEET OF 4 INCH POLY AND ABANDON 1430 FEET OF 3 INCH STEEL AND 41 FEET OF 3 INCH POLY ALONG WHALEY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE SYSTEM INTEGRITY OCTOBER 2411 080.66071 19,039 RELOCATE FACILITIES. INSTALL 40 FEET OF 4 INCH STEEL ALONG WHEATLAND AND ABANDON 40 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2412 080.66083 307 RELOCATE FACILITIES. INSTALL 20 FEET OF 2 INCH POLY AND ABANDON 10 FEET OF 2 INCH STEEL ALONG ELM PARK AND MAPLE PARK DRIVE TO ACCOMMODATE CITY OF RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS RELOCATION OF FACILITIES OCTOBER 2413 080.66107 1,383 INSTALL 500 FEET OF 4 INCH POLY ALONG DALLAS STREET AND ABANDON 500 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COOPER SYSTEM INTEGRITY OCTOBER 2414 080.66110 56,680 INSTALL 2300 FEET OF 4 INCH POLY ALONG MILITARY PARKWAY AND ABANDON 1700 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2415 080.66113 45,989 RELOCATE FACILITIES. INSTALL 1420 FEET OF 2 INCH POLY AND ABANDON 1314 FEET OF 2 INCH STEEL AND 111 FEET OF 2 INCH POLY ALONG BOMBAY AVENUE TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2416 080.66125 3,336 RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH POLY AND ABANDON 209 FEET OF 2 INCH STEEL AND 82 FEET OF 3 INCH STEEL AND 195 FEET OF 4 INCH STEEL ALONG CARROLL TO ACCOMMODATE CITY OF ATHENS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS RELOCATION OF FACILITIES OCTOBER 2417 080.66131 4,650 RELOCATE FACILITIES. INSTALL NINE 0.75 INCH SERVICE LINES ALONG CROWNOVER CT TO ACCOMODATE CITY OF DALLAS STREET PROJECT AND ABANDON NINE 0.75 INCH SERVICE LINES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2418 080.66135 498 INSTALL 161 FEET OF POLY AND ABANDON 161 FEET OF 2 INCH STEEL ALONG AVENUE F IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURKBURNETT SYSTEM INTEGRITY OCTOBER 2419 080.66142 858 INSTALL 160 FEET OF 2 INCH POLY AND ABANDON 292 FEET OF 2 INCH STEEL AND 67 FEET OF 2 INCH POLY ALONG TREMONT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BYERS SYSTEM INTEGRITY OCTOBER 2420 080.66155 43,957 RELOCATE FACILITIES. INSTALL 2246 FEET OF 4 INCH POLY ALONG BELL BOULEVARD AND ABANDON 1289 FEET OF 2 INCH, 277 FEET OF 4 INCH AND 215 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF CEDAR PARK ROAD PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR PARK RELOCATION OF FACILITIES OCTOBER MTX Additions Page 77 of 178 296 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2421 080.66157 172 INSTALL 96 FEET OF 2 INCH POLY AND ABANDON 98 FEET OF 2 INCH STEEL ALONG FM1085 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYLVESTER SYSTEM INTEGRITY OCTOBER 2422 080.66172 3,363 RELOCATE FACILITIES. INSTALL 60 FEET OF 4 INCH POLY AND ABANDON 60 FEET OF 4 INCH POLY ALONG FM 1633 TO ACCOMMODATE A TXDOT ROAD IMPROVEMENT PROJECT IN THE CITY OF MEXIA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA RELOCATION OF FACILITIES OCTOBER 2423 080.66179 3,885 INSTALL 995 FEET OF 2 INCH POLY ALONG THE STREETS OF THE NORTH CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL MELISSA GROWTH JUNE 2424 080.66181 22,505 RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH POLY AND 742 FEET OF 4 INCH POLY AND ABANDON 14 FEET OF 2 INCH STEEL AND 666 FEET OF 3 INCH STEEL AND 2168 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF EVERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN RELOCATION OF FACILITIES OCTOBER 2425 080.66186 213 INSTALL REGULATOR AND RELIEF VALVE ALONG DRS02 AND ABANDON REGULATOR AND RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY OCTOBER 2426 080.66209 53,484 RELOCATE FACILITIES. INSTALL 2175 FEET OF 6 INCH STEEL AND ABANDON 1165 FEET OF 6 INCH STEEL ALONG FM 407 TO ACCOMMODATE CITY OF JUSTIN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JUSTIN RELOCATION OF FACILITIES OCTOBER 2427 080.66212 27,148 INSTALL 2 INCH WORKER MONITOR AND RELIEF VALVE AND ABANDON RELIEF VALVES ON DISTRICT REGULATOR STATION 08 AND 20 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER 2428 080.66213 16,070 REPLACE DISTRICT REGULATOR STATION 09, 01, 17, 02 AND 246 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER 2429 080.66214 29 ABANDON 1067 FEET OF 2 INCH POLY, 12 LONG SIDE SERVICE STUBS, AND 19 SHORT SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER 2430 080.66216 1,211 INSTALL 100 FEET OF 4 INCH POLY AND ABANDON 293 FEET OF 4 INCH STEEL ALONG MCCRACKEN ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 2431 080.66217 336 INSTALL 120 FEET OF 4 INCH POLY AND ABANDON 188 FEET OF 4 INCH STEEL AND 50 FEET OF 6 INCH STEEL ALONG MAIDEN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER 2432 080.66218 486 INSTALL 15 FEET OF 6 INCH POLY AND ABANDON 10 FEET OF 6 INCH STEEL ALONG PRAIREVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY OCTOBER 2433 080.66223 285 INSTALL 185 FEET OF 4 INCH POLY AND ABANDON 185 FEET OF 4 INCH STEEL ALONG DEAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER 2434 080.66224 8,186 INSTALL 1418 FEET OF 4 INCH POLY AND ABANDON 318 FEET OF 3 INCH STEEL AND 331 FEET OF 3 INCH POLY AND 740 FEET OF 4 INCH STEEL ALONG BOIS D ARC IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSCOE SYSTEM INTEGRITY OCTOBER 2435 080.66229 3,789 RELOCATE FACILITIES. INSTALL 65 FEET OF 2 INCH POLY ALONG OAK DRIVE AND ABANDON 98 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF KELLER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER RELOCATION OF FACILITIES OCTOBER 2436 080.66233 2,467 INSTALL CLOCKSPRINGS ALONG LINE CA(3RD). ALL CUSTOMERS FORT WORTH PIPELINE INTEGRITY OCTOBER 2437 080.66238 243 INSTALL 5000 FEET OF 2 INCH POLY ALONG THE STREETS OF THE ARCADIA FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PRINCETON GROWTH MARCH 2438 080.66244 414 INSTALL 240 FEET OF 2 INCH IP POLY ALONG CAROLINA AND ABANDON 197 FEET OF 2 INCH STEEL, 946 FEET OF 2 INCH STEEL AND 275 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2439 080.66250 290 ABANDON DRS414 ALONG BISHOP STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2440 080.66252 244 INSTALL 230 FEET OF 2 INCH POLY ALONG POE AND ABANDON 50 FEET OF 1 INCH STEEL AND DISTRICT REGULATOR STATION 82 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 2441 080.66258 48 ABANDON DRS 303 ALONG SYLVANIA AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2442 080.66261 50 ABANDON DRS300 ALONG SYLVANIA AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2443 080.66262 219,627 INSTALL 1487 FEET OF 4 INCH POLY AND ABANDON 158 FEET OF 2 INCH STEEL, 301 FEET OF 2 INCH POLY, 11 FEET OF 4 INCH POLY ALONG LOVE CIRCLE ACROSS STATE HIGHWAY 199 DUE TO CITY CONFLICT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 2444 080.66272 187 ABANDON 1950 FEET OF 2 INCH STEEL AND 50 FEET OF 4 INCH POLY ALONG DODSON LAKE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 2445 080.66273 13,842 RELOCATE FACILITIES. INSTALL 1,812 FEET OF 2 INCH POLY ALONG MISTY LANE AND ABANDON 1,702 FEET OF 2 INCH STEEL AND 110 FEET OF 2 INCH STEEL MAIN TO ACCOMMODATE THE CITY OF DESOTO DRAINAGE PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO RELOCATION OF FACILITIES OCTOBER 2446 080.66274 47,722 RELOCATE FACILITIES. INSTALL 978 FEET OF 4 INCH POLY AND ABANDON 540 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY AND 302 FEET OF 6 INCH STEEL ALONG 5TH STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2447 080.66275 7,425 INSTALL 478 FEET OF 2 INCH POLY AND 829 FEET OF 4 INCH POLY AND ABANDON 262 FEET OF 2 INCH POLY AND 829 FEET OF 4 INCH STEEL AND 65 FEET OF 4 INCH POLY ALONG GRAND AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY OCTOBER 2448 080.66277 48 ABANDON DRS165 ALONG YATES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2449 080.66279 8,082 INSTALL 300 FEET OF 2 INCH POLY ALONG WILLIAMS RANCH ROAD AND ABANDON 430 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER 2450 080.66284 3,084 ABANDON DIAPHRAGM METER AND REPLACE STATION PIPING ALONG HIDDEN CREEK PARKWAY AT MEASUREMENT STATION 4528A IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY OCTOBER 2451 080.66295 12,797 RELOCATE FACILITIES. INSTALL 730 FEET OF 6 INCH POLY ALONG LEONARD DRIVE AND ABANDON 725 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF ANNA IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANNA RELOCATION OF FACILITIES OCTOBER 2452 080.66297 959 RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY AND ABANDON 311 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF SAN ANGELO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO RELOCATION OF FACILITIES OCTOBER 2453 080.66298 41,018 INSTALL 1532 FEET OF 4 INCH POLY AND ABANDON 813 FEET OF 2 INCH STEEL AND 20 FEET OF 2 INCH POLY AND 1498 FEET OF 3 INCH STEEL ALONG BALDRIGE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE SYSTEM INTEGRITY OCTOBER 2454 080.66299 4,626 RELOCATE FACILITIES. INSTALL 483 FEET OF 2 INCH POLY AND 454 FEET OF 4 INCH POLY AND 213 FEET OF 6 INCH POLY AND ABANDON 259 FEET OF 2 INCH STEEL AND 269 FEET OF 2 INCH POLY AND 9 FEET OF 3 INCH STEEL AND 432 FEET OF 3 INCH POLY AND 201 FEET OF 4 INCH STEEL ALONG LEWIS STREET TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES OCTOBER MTX Additions Page 78 of 178 297 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2455 080.66301 81,711 RELOCATE FACILITIES. INSTALL 180 FEET OF 2 INCH POLY AND 2749 FEET OF 4 INCH POLY AND ABANDON 110 FEET OF 2 INCH STEEL AND 540 FEET OF 2 INCH POLY AND 110 FEET OF 3 INCH POLY AND 2120 FEET OF 4 INCH STEEL ALONG PEMBERTON TO ACCOMMODATE CITY OF WHITE SETTLEMENT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT RELOCATION OF FACILITIES OCTOBER 2456 080.66302 84 RELOCATE FACILITIES. INSTALL 28 FEET OF 3 INCH STEEL AND ABANDON 16 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF COMFORT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMFORT RELOCATION OF FACILITIES OCTOBER 2457 080.66312 (2,649) RELOCATE FACILITIES. INSTALL 375 FEET OF 8 INCH POLY ALONG TXDOT SH 45 FRONTAGE ROAD AND ABANDON 375 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF PFLUGERVILLE WASTEWATER LINE PROJECT. ALL CUSTOMERS PFLUGERVILLE RELOCATION OF FACILITIES APRIL 2458 080.66328 299 ABANDON DRS178 ALONG EPPS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2459 080.66330 103,351 INSTALL 4,000 FEET OF 2 INCH, 250 FEET OF 4 INCH POLY ALONG THE STREETS OF TOM BRANIFF AND TEXAS PLAZA DRIVE SUBDIVISION IN IRVING. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL IRVING GROWTH DECEMBER 2460 080.66338 75,383 RELOCATE FACILITIES. INSTALL 1500 FEET OF 4 INCH POLY AND 500 FEET OF 8 INCH POLY ALONG ERNIE STREET AND ABANDON 500 FEET OF 3 INCH POLY, 1000 FEET OF 4 INCH STEEL AND 500 FEET OF 8 INCH STEEL TO ACCOMMODATE BNSF RAILWAY IMPROVEMENTS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE RELOCATION OF FACILITIES OCTOBER 2461 080.66373 111,190 RELOCATE FACILITIES. INSTALL 20 FEET OF 20 INCH STEEL AND ABANDON 20 FEET OF 22 INCH STEEL ALONG LINE D TO ACCOMMODATE CREEK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2462 080.66376 3,111 INSTALL 445 FEET OF 2 INCH POLY ALONG MILLER PARK AND ABANDON 440 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 2463 080.66384 27,703 INSTALL THREE CLOCKSPRINGS ALONG LINE D(DALLAS EAST TO WHITE ROCK). ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2464 080.66391 501 INSTALL RELIEF VALVE ON MARLIN MEASURING STATION AND ABANDON RELIEF VALVE AT MEASURING STATION. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY OCTOBER 2465 080.66392 82,733 RELOCATE FACILITIES. INSTALL 3500 FEET OF 8 INCH AND 35 FEET OF 2 INCH POLY ALONG CLIFFORD STREET AND ABANDON 3200 FEET OF 16 INCH AND 165 FEET OF 8 INCH STEEL AND 770 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF WHITE SETTLEMENT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT RELOCATION OF FACILITIES OCTOBER 2466 080.66395 13,534 RELOCATE FACILITIES. INSTALL 474 FEET OF 2 INCH POLY AND ABANDON 385 FEET OF 2 INCH STEEL ALONG FLORENCE ROAD TO ACCOMMODATE CITY OF SOUTHLAKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE RELOCATION OF FACILITIES OCTOBER 2467 080.66398 168 INSTALL 497 FEET OF 2 INCH POLY AND ABANDON 76 FEET OF 2 INCH POLY AND 1938 FEET OF 3 INCH STEEL AND 179 FEET OF 4 INCH POLY ALONG LORD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY OCTOBER 2468 080.66403 4,067 RELOCATE FACILITIES. INSTALL 775 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY AND ABANDON 95 FEET OF 2 INCH STEEL AND 1138 FEET OF 2 INCH POLY ALONG HWY276 TO ACCOMMODATE CITY OF QUINLAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUINLAN RELOCATION OF FACILITIES OCTOBER 2469 080.66430 11,425 INSTALL 160 FEET OF 8 INCH, 50 FEET OF 2 INCH AND 75 FEET OF 4 INCH POLY ALONG ABRAMS ROAD AND ABANDON 160 FEET OF 16 INCH, 60 FEET OF 2 INCH AND 75 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2470 080.66447 33,662 INSTALL 1800 FEET OF 2 INCH POLY ALONG 8TH STREET AND ABANDON 670 FEET OF 3 INCH, 700 FEET OF 2 INCH STEEL AND 130 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE SYSTEM INTEGRITY OCTOBER 2471 080.66462 1,089 INSTALL 261 FEET OF 4 INCH POLY AND ABANDON 261 FEET OF 4 INCH STEEL ALONG CARBONDALE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2472 080.66463 53 ABANDON DISTRICT REGULATOR STATION 166 IN FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2473 080.66479 36,362 INSTALL 1010 FEET OF 4 INCH POLY AND ABANDON 1010 FEET OF 3 INCH STEEL ALONG FM 1660 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HUTTO SYSTEM INTEGRITY OCTOBER 2474 080.66490 41 ABANDON 3770 FEET OF 1 INCH STEEL 237 FEET OF 1.25 INCH POLY AND 13 FEET OF 2 INCH POLY ALONG FM2640 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY OCTOBER 2475 080.66508 66,524 RELOCATE FACILITIES. INSTALL 215 FEET OF 2 INCH POLY AND 1280 FEET OF 4 INCH POLY AND ABANDON 118 FEET OF 2 INCH POLY AND 414 FEET OF 4 INCH STEEL AND 590 FEET OF 4 INCH POLY ALONG SYCAMORE STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 2476 080.66510 1,907 INSTALL 686 FEET OF 2 INCH POLY AND ABANDON 685 FEET OF 2 INCH STEEL ALONG I20 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER 2477 080.66557 695,368 RELOCATE FACILITIES. INSTALL 700 FEET OF 12 INCH STEEL ALONG HIGHWAY 80 AND ABANDON 700 FEET OF 12 INCH STEEL TO ACCOMODATE UNION PACIFIC BRIDGE PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY JUNE 2478 080.66563 15,872 INSTALL 530 FEET OF 4 INCH POLY AND ABANDON 147 FEET OF 4 INCH STEEL AND 293 FEET OF 4 INCH POLY ALONG BIG BEND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLEN ROSE SYSTEM INTEGRITY OCTOBER 2479 080.66564 13,928 REPLACE DISTRICT REGULATOR STATION 02 AND 04 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BAIRD SYSTEM INTEGRITY OCTOBER 2480 080.66581 12,245 INSTALL DISTRICT REGULATOR STATION 02,04, AND 05 IN CLYDE AND ABANDON DISTRICT REGULATOR STATION 02,04, AND 05 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLYDE SYSTEM INTEGRITY DECEMBER 2481 080.66582 5,123 ABANDON DISTRICT REGULATOR STATION #026 IN DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2482 080.66583 57,426 RELOCATE FACILITIES. 1000 FEET OF 4 INCH STEEL ALONG MARS DRIVE AND ABANDON 1000 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WACO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 2483 080.66584 21,149 INSTALL 22 FEET OF 2 INCH STEEL AND 24 FEET OF 4 INCH STEEL AND 31 FEET OF 10 INCH STEEL AND ABANDON 23 FEET OF 10 INCH STEEL ALONG STREETS OF HYATT HOTEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY OCTOBER 2484 080.66586 24,906 REPLACE DISTRICT REGULATOR STATION #04, 05, 06 IN COLEMAN AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY OCTOBER 2485 080.66597 1,554 INSTALL 120 FEET OF 4 INCH POLY ALONG BENTLEY AND ABANDON 120 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER 2486 080.66605 1,648 INSTALL 310 FEET OF 3 INCH AND 180 FEET OF 6 INCH POLY ALONG LEXINGTON AND ABANDON 310 FEET OF 3 INCH AND 180 FEET OF 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER 2487 080.66610 548 INSTALL 80 FEET OF 4 INCH POLY ALONG 21ST STREET AND ABANDON 50 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 2488 080.66629 48,894 REPLACE DISTRICT REGULATOR STATION 07, 08, 13, AND 14 IN COMANCHE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY OCTOBER 2489 080.66639 12,103 INSTALL 392 FEET OF 2 INCH POLY AND ABANDON 402 FEET OF 2 INCH STEEL AND 8 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MORAN SYSTEM INTEGRITY OCTOBER MTX Additions Page 79 of 178 298 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2490 080.66650 34,999 REPLACE DISTRICT REGULATOR STATION #03, 04 , 05, 07 IN DE LEON AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY OCTOBER 2491 080.66651 1,649 INSTALL TEST STATION AND DECOUPLER ALONG REAGAN BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEANDER SYSTEM INTEGRITY OCTOBER 2492 080.66653 310 RELOCATE FACILITIES. INSTALL 15 FEET OF 2 INCH POLY ALONG PAIGE DRIVE AND ABANDON 10 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF THE COLONY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THE COLONY RELOCATION OF FACILITIES OCTOBER 2493 080.66654 57,044 INSTALL AND ABANDON DISTRICT REGULATOR STATION #03,09, 14, 17 IN GORMAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORMAN SYSTEM INTEGRITY OCTOBER 2494 080.66655 2,793 INSTALL 142 FEET OF 4 INCH POLY AND ABANDON 123 FEET OF 4 INCH STEEL AND 7 FEET OF 4 INCH POLY ALONG BUTTERNUT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 2495 080.66656 20,198 INSTALL 1409 FEET OF 2 INCH POLY AND ABANDON 1405 FEET OF 2 INCH STEEL ALONG PINE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 2496 080.66666 5,380,731 INSTALL 5,100 FEET OF 16 INCH STEEL OF LINE C16 IN EULESS AND ABANDON 5,100 FEET OF 16 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY DECEMBER 2497 080.66668 28,495 RELOCATE FACILITIES. ABANDON 795 FEET OF 4 INCH STEEL AND 100 FEET OF 4 INCH POLY ALONG SILVER CREEK ROAD AND BENNETT STREET TO ACCOMMODATE CITY OF WHITE SETTLEMENT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT RELOCATION OF FACILITIES OCTOBER 2498 080.66669 44,744 RELOCATE FACILITIES. INSTALL 1462 FEET OF 4 INCH POLY AND ABANDON 1295 FEET OF 4 INCH STEEL ALONG SOUTH HUGHES TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2499 080.66670 89,372 RELOCATE FACILITIES. INSTALL 11 FEET OF 4 INCH POLY AND 2625 FEET OF 6 INCH POLY AND ABANDON 16 FEET OF 4 INCH POLY AND 2620 FEET OF 6 INCH STEEL ALONG TUMBLEWEED TRAIL TO ACCOMMODATE CITY OF WHITE SETTLEMENT STREET IMPROVEMENT PROJECT. ALL CUSTOMERS WHITE SETTLEMENT RELOCATION OF FACILITIES OCTOBER 2500 080.66671 463 ABANDON DRS179 ALONG BIDDISON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2501 080.66672 32,248 INSTALL 200 FEET OF 4 INCH, 500 FEET OF 2 INCH POLY, DRS 21, DRS 24, DRS 27, DRS 29, AND DRS 31 AND ABANDON 225 FEET OF 4 INCH POLY, 75 FEET OF 4 INCH STEEL, 60 FEET OF 2 INCH STEEL AND 25 FEET OF 2 INCH POLY, DRS 21, 24, 27, 29, AND 31 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER 2502 080.66673 32,337 INSTALL 300 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY, DRS 18, DRS 26, DRS 30 AND DRS 38 AND ABANDON 50 FEET OF 4 INCH STEEL, 25 FEET OF 3 INCH STEEL, 50 FEET OF 2 INCH POLY, DRS 18, DRS 26, DRS 30, AND DRS 38 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER 2503 080.66675 21 ABANDON DISTRICT REGULATOR STATION 253 ALONG AIRLINE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2504 080.66678 10,391 INSTALL 576 FEET OF 4 INCH POLY AND ABANDON 583 FEET OF 2 INCH POLY AND 15 FEET OF 4 INCH STEEL ALONG ARIZONA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA SYSTEM INTEGRITY OCTOBER 2505 080.66686 1,447 INSTALL 180 FEET OF 2 INCH ALONG AVENUE B AND ABANDON 379 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY OCTOBER 2506 080.66692 62,617 RELOCATE FACILITIES. INSTALL 1730 FEET OF 4 INCH POLY AND ABANDON 206 FEET OF 3 INCH STEEL AND 750 FEET OF 4 INCH STEEL AND 818 FEET OF 4 INCH POLY ALONG JASPER STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2507 080.66696 2,932 INSTALL 295 FEET OF 4 INCH POLY AND ABANDON 293 FEET OF 3 INCH STEEL ALONG AVENUE B IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER 2508 080.66701 28,090 RELOCATE FACILITIES. INSTALL 994 FEET OF 2 INCH POLY, 3 FEET OF 3 INCH POLY, AND 460 FEET OF 4 INCH POLY AND ABANDON 940 FEET OF 2 INCH POLY AND 415 FEET OF 3 INCH STEEL ALONG FAIRFIELD STREET TO ACCOMMODATE CITY OF BUFFALO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BUFFALO RELOCATION OF FACILITIES OCTOBER 2509 080.66704 22,433 RELOCATE FACILITIES. INSTALL 1523 FEET OF 2 INCH POLY AND ABANDON 1425 FEET OF 2 INCH POLY ALONG BROADWAY AVENUE TO ACCOMMODATE CITY OF EULESS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS RELOCATION OF FACILITIES OCTOBER 2510 080.66708 745 INSTALL 180 FEET OF 2 INCH POLY ALONG CRESCENT AND ABANDON 280 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY OCTOBER 2511 080.66709 9,527 INSTALL AND ABANDON DRS01 AND ABANDON DRS02 IN MILES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILES SYSTEM INTEGRITY OCTOBER 2512 080.66713 8,955 INSTALL 625 FEET OF 2 INCH AND 320 FEET OF 4 INCH POLY AND ABANDON DRS STATION 25 AND 334 FEET OF 4 INCH STEEL, 34 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER 2513 080.66715 162 ABANDON 100 FEET OF 1.25 INCH STEEL ALONG HIGHWAY 64 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TYLER SYSTEM INTEGRITY OCTOBER 2514 080.66717 49,558 INSTALL AND ABANDON DISTRICT REGULATOR STATIONS DRS02, DRS03, DRS04, DRS14, DRS15, DRS16 IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS DUBLIN SYSTEM INTEGRITY OCTOBER 2515 080.66718 90,485 INSTALL 1850 FEET OF 2 INCH AND 1785 FEET OF 4 INCH POLY ALONG FEATHERSTON STREET AND ABANDON 1780 FEET OF 4 INCH STEEL AND 1420 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER 2516 080.66726 7,583 INSTALL AND ABANDON DISTRICT REGULATOR STATION #04 IN HICO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HICO SYSTEM INTEGRITY OCTOBER 2517 080.66728 14,896 INSTALL DISTRICT REGULATOR STATIONS ALONG STREETS OF STEPHENVILLE AND ABANDON DISTRCT REGULATOR STATION 01 AND DISTRICT REGULATOR STATION 09 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY OCTOBER 2518 080.66732 13,692 INSTALL DISTRICT REGULATOR STATION 12 AND DISTRICT REGULATOR STATION 16 ALONG THE STREETS OF STEPHENVILLE TEXAS AND ABANDON DISTRICT REGULATOR STATION 12 AND DISTRICT REGULATOR STATION 16 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY OCTOBER 2519 080.66736 4,105 INSTALL 150 FEET OF 2 INCH POLY ALONG JAMES AVENUE AND ABANDON 150 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2520 080.66748 6,696 INSTALL 725 FEET OF 2 INCH POLY ALONG ELLIS AND ABANDON 345 FEET OF 4 INCH STEEL AND 397 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER 2521 080.66752 37,327 RELOCATE FACILITIES. INSTALL 1937 FEET OF 2 INCH POLY AND 579 FEET OF 4 INCH POLY AND ABANDON 1859 FEET OF 2 INCH STEEL AND 125 FEET OF 2 INCH POLY AND 244 FEET OF 4 INCH STEEL ALONG FM59 TO ACCOMMODATE CITY OF ATHENS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS RELOCATION OF FACILITIES OCTOBER 2522 080.66755 26,844 INSTALL 1400 FEET OF 2 INCH POLY ALONG GOWDY STREET AND ABANDON 1340 FEET OF 3 INCH AND 210 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 06 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITEWRIGHT SYSTEM INTEGRITY OCTOBER 2523 080.66764 18 RELOCATE FACILITIES. ABANDON 80 FEET OF 2 INCH POLY ALONG LAMPASAS STREET TO ACCOMMODATE CITY OF ROUND ROCK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK RELOCATION OF FACILITIES OCTOBER MTX Additions Page 80 of 178 299 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2524 080.66769 67,148 RELOCATE FACILITIES. INSTALL 4489 FEET OF POLY AND ABANDON 4494 FEET OF STEEL TO ACCOMODATE THE CITY OF WACO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 2525 080.66771 5,680 INSTALL DISTRICT REGULATOR STATION IN COLORADO CITY AND ABANDON DISTRICT REGULATOR STATION 14 IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS COLORADO CITY SYSTEM INTEGRITY OCTOBER 2526 080.66775 76,069 INSTALL 1600 FEET OF 20 INCH STEEL ALONG SCYENE ROAD AND DIXON AVENUE AND ABANDON 1600 FEET OF 24 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2527 080.66792 5,750 INSTALL 1906 FEET OF 4 INCH POLY ALONG LEGACY DRIVE. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PROSPER GROWTH MARCH 2528 080.66793 47,418 RELOCATE FACILITIES. INSTALL 3,920 FEET OF 6 INCH AND 216 FEET OF 2 INCH POLY ALONG MCKINNEY STREET EAST AND ABANDON 1520 FEET OF 6 INCH, 2400 FEET OF 4 INCH AND 190 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 2529 080.66801 15,100 RELOCATE FACILITIES. INSTALL 620 FEET OF 4 INCH AND 220 FEET OF 2 INCH POLY ALONG HARDY ST AND ABANDON 663 FEET OF 3 INCH, 80 FEET OF 4 INCH, 200 FEET OF 2 INCH POLY, AND 8 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF CEDAR HILL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL RELOCATION OF FACILITIES OCTOBER 2530 080.66804 18,082 RELOCATE FACILITIES. INSTALL 410 FEET OF 2 INCH POLY ALONG MAIN AND ABANDON 395 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF KEMP IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEMP RELOCATION OF FACILITIES OCTOBER 2531 080.66805 10,306 RELOCATE FACILITIES. INSTALL 439 FEET OF 2 INCH POLY AND ABANDON 437 FEET OF 2 INCH STEEL ALONG FORBES COURT TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2532 080.66809 1,093,642 INSTALL 250 FEET OF 6 INCH STEEL ALONG AUTUMN CIRCLE IN COLLEGE STATION AND ABANDON 250 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY DECEMBER 2533 080.66810 3,330 INSTALL 309 FEET OF 4 INCH POLY AND ABANDON 309 FEET OF 2 INCH STEEL ALONG WALNUT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER 2534 080.66815 21,410 RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY AND 385 FEET OF 4 INCH POLY AND 132 FEET OF 6 INCH POLY AND ABANDON 70 FEET OF 2 INCH POLY AND 22 FEET OF 4 INCH STEEL AND 376 FEET OF 6 INCH STEEL ALONG SMITH BARRY STREET TO ACCOMMODATE CITY OF PANTEGO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PANTEGO RELOCATION OF FACILITIES OCTOBER 2535 080.66817 8,913 ABANDON 640 FEET OF 3 INCH STEEL ALONG HIGHWAY 190 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOLANVILLE SYSTEM INTEGRITY OCTOBER 2536 080.66822 31,970 RELOCATE FACILITIES. INSTALL 1450 FEET OF 4 INCH POLY ALONG METHODIST STREET AND ABANDON 1055 FEET OF 2 INCH STEEL AND 395 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF RED OAK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RED OAK RELOCATION OF FACILITIES OCTOBER 2537 080.66831 15,237 INSTALL 3 FEET OF 3 INCH POLY AND 886 FEET OF 4 INCH POLY AND ABANDON 46 FEET OF 3 INCH POLY AND 53 FEET OF 4 INCH POLY AND 757 FEET OF 6 INCH POLY ALONG BROOKHAVEN CLUB DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY OCTOBER 2538 080.66841 38,116 RELOCATE FACILITIES. INSTALL 3,335 FEET OF 4 INCH POLY ALONG ESPLANDE AND ABANDON 1,910 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF GRAND PRAIRIE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES OCTOBER 2539 080.66846 1,032 ABANDON 88 FEET OF 2 INCH STEEL ALONG EAST EXCHANGE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2540 080.66850 54,150 RELOCATE FACILITIES. INSTALL 3378 FEET OF 2 INCH POLY AND ABANDON 640 FEET OF 2 INCH STEEL AND 200 FEET OF 3 INCH POLY AND 800 FEET OF 4 INCH POLY ALONG CUMBERLAND ROAD TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE RELOCATION OF FACILITIES OCTOBER 2541 080.66859 16,388 INSTALL 117 FEET OF 4 INCH POLY AND 88 FEET OF 6 INCH POLY AND ABANDON 99 FEET OF 4 INCH STEEL, 17 FEET OF 4 INCH POLY, 64 FEET OF 6 INCH STEEL AND, 2 FEET OF 6 INCH POLY IN THE CITY OF ABILENE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 2542 080.66862 154 ABANDON DRS54 ALONG PIERCE STREET IN SAN ANGELO IN ACCORDANCE WITH RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 2543 080.66866 29,394 RELOCATE FACILITIES. INSTALL 280 FEET OF 2 INCH POLY ALONG EDGEWOOD PLACE AND ABANDON 210 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF DENTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 2544 080.66867 322 REPLACE REGULATOR AND RELIEF VALVE ON DENTON DRS06. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER 2545 080.66869 13,813 RELOCATE FACILITIES. INSTALL (4) .75 INCH POLY SERVICES AND ABANDON (4) .75 INCH POLY SERVICES ALONG FOX HOLLOW STREET TO ACCOMMODATE CITY OF DENTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 2546 080.66870 118,136 RELOCATE FACILITIES. INSTALL 3,400 FEET OF 2 INCH POLY ALONG HILLCREST STREET AND ABANDON 685 FEET OF 2 INCH POLY AND 2,720 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF DENTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 2547 080.66873 4,494 INSTALL 1080 FEET OF 4 INCH POLY ALONG FM1741 AND ABANDON 248 FEET OF 2 INCH, 550 FEET OF 4 INCH POLY, AND 13450 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER 2548 080.66878 44,460 RELOCATE FACILITIES. INSTALL 832 FEET OF 4 INCH STEEL AND ABANDON 829 FEET OF 4 INCH STEEL ALONG FM 1187 AND WILDCAT WAY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2549 080.66887 47 INSTALL 9000 FEET OF 4 INCH, AND 6550 FEET OF 2 INCH POLY ALONG STREETS OF SOUTHPOINTE PHASE 4 SUBDIVISION. RESIDENTIAL MANSFIELD GROWTH MARCH 2550 080.66890 1,554 ABANDON 326 FEET OF 2 INCH STEEL AND 434 FEET OF 2 INCH POLY ALONG GROUND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MORAN SYSTEM INTEGRITY OCTOBER 2551 080.66925 15,993 INSTALL 900 FEET OF 2 INCH POLY AND ABANDON 356 FEET OF 2 INCH STEEL AND 543 FEET OF 2 INCH STEEL ALONG MATADOR IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 2552 080.66926 300 ABANDON 34 FEET OF 2 INCH POLY AND 21 FEET OF 4 INCH STEEL ALONG JERSEY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY OCTOBER 2553 080.66927 3,295 INSTALL RELIEF VALVE AND RETIRE RELIEF VALVE ON LINE L (SOUTH) NEAR THE INTERSECTION OF COUNTY ROAD 107 AND COUNTY ROAD 100 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER 2554 080.66934 452 INSTALL GAS SAMPLER AND ABANDON GAS SAMPLER ALONG THE STREETS OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2555 080.66956 2,428 RELOCATE FACILITIES. INSTALL (9) POLY SERVICES ALONG THE NORTH ALLEY FROM REGAL ROAD AND ABANDON (9) POLY SERVICES TO ACCOMMODATE THE CITY OF PLANO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES OCTOBER 2556 080.66959 16,925 RELOCATE FACILITES. INSTALL 1150 FEET OF 2 INCH POLY AND ABANDON 314 FEET OF 3 INCH STEEL AND 399 FEET OF 2 INCH POLY AND 345 FEET OF 2 INCH STEEL IN TRENT, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENT RELOCATION OF FACILITIES OCTOBER 2557 080.66972 660 INSTALL FLOW SAFE RELIEF VALVE AT REGULATOR STATION AND ABANDON 6 INCH GROVE RELIEF VALVE AT DISTRICT REGULATOR STATION IN KELLER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY OCTOBER MTX Additions Page 81 of 178 300 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2558 080.66976 3,120 RELOCATE FACILITIES. INSTALL 40 FEET OF 4 INCH POLY IN THE ALLEY NORTH OF PLUMMER AND ABANDON 40 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND RELOCATION OF FACILITIES OCTOBER 2559 080.66980 14,591 RELOCATE FACILITES. INSTALL 300 FEET OF 6 INCH POLY AND ABANDON 300 FEET OF 6 INCH STEEL ALONG 5TH AND CLINTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE RELOCATION OF FACILITIES OCTOBER 2560 080.66983 8,722 RELOCATE FACILITIES. INSTALL 187 FEET OF 2 INCH POLY ALONG HARRISON STREET AND ABANDON 342 FEET OF 2 INCH AND 147 FEET OF 3 INCH STEEL, 28 FEET OF 2 INCH, AND 133 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF MELISSA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA RELOCATION OF FACILITIES OCTOBER 2561 080.66997 31,425 RELOCATE FACILITIES. INSTALL 488 FEET OF 2 INCH POLY AND 351 FEET OF 4 INCH POLY AND ABANDON 714 FEET OF 2 INCH POLY AND 460 FEET OF 3 INCH POLY EAST MAIN STREET TO ACCOMMODATE CITY OF ROUND ROCK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK RELOCATION OF FACILITIES OCTOBER 2562 080.67008 7,810 RELOCATE FACILITIES. INSTALL 200 FEET OF 6 INCH AND 185 FEET OF 2 INCH POLY ALONG WEST CREEK STREET AND ABANDON 174 FEET OF 6 INCH IP STEEL AND 20 FEET OF 6 INCH IP POLY AND 122 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG RELOCATION OF FACILITIES OCTOBER 2563 080.67010 23,762 INSTALL 376 FEET OF 6 INCH POLY AND ABANDON 364 FEET OF 6 INCH CAST IRON AND 13 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 2564 080.67027 40,365 RELOCATE FACILITIES. INSTALL 2000 FEET OF 2 INCH AND 1150 FEET OF 4 INCH POLY ALONG ST MARY AND ABANDON 650 FEET OF 4 INCH AND 845 FEET OF 2 INCH STEEL AND 1655 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF ROCKWALL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL RELOCATION OF FACILITIES OCTOBER 2565 080.67030 13,955 INSTALL 6 FEET OF 2 INCH POLY AND 512 FEET OF 4 INCH POLY AND ABANDON 296 FEET OF 2 INCH STEEL AND 204 FEET OF 2 INCH POLY ALONG MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT SYSTEM INTEGRITY OCTOBER 2566 080.67033 11,958 RELOCATE FACILITIES. INSTALL 540 FEET OF 4 INCH POLY AND ABANDON 596 FEET OF 4 INCH POLY ALONG JOHN MCLAIN ROAD AND WESTCOAT TO ACCOMMODATE CITY OF COLLEYVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE RELOCATION OF FACILITIES OCTOBER 2567 080.67058 308 ABANDON DRS 174 AT THE INTERSECTION OF FULLER AND RYAN, FORT WORTH, TARRANT COUNTY. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2568 080.67060 0 INSTALL 11,369 FEET OF 2 INCH POLY, 1758 FEET OF 4 INCH POLY, AND 2134 FEET OF 6 INCH POLY ALONG THE STREETS OF THE VILLAGE OF HURRICANE CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ANNA GROWTH JANUARY 2569 080.67072 11,206 RELOCATE FACILITIES. INSTALL 1230 FEET OF 2 INCH POLY ALONG CLOVERDALE LANE AND ABANDON 1230 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DESOTO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO RELOCATION OF FACILITIES OCTOBER 2570 080.67075 385 ABANDON 1055 FEET OF 3 INCH STEEL AND 4100 FEET OF 3 INCH POLY ALONG STREETS IN BREEZY OAKS MOBILE HOME PARK IN TARRANT COUNTY MANSFIELD TEXAS. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY OCTOBER 2571 080.67077 151,106 INSTALL 2304 FEET OF 10 INCH STEEL AND ABANDON 2289 FEET OF 12 INCH STEEL ALONG BLACK HILL DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINSVILLE SYSTEM INTEGRITY DECEMBER 2572 080.67096 5,694 RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH POLY ALONG 800 AUSTIN AVE AND ABANDON 104 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 2573 080.67099 27,361 RELOCATE FACILITIES. INSTALL 180 FEET OF 2 INCH POLY AND 3 FEET OF 4 INCH POLY AND 872 FEET OF 6 INCH POLY AND ABANDON 360 FEET OF 2 INCH STEEL AND 82 FEET OF 2 INCH POLY AND 797 FEET OF 6 INCH STEEL AND 10 FEET OF 6 INCH POLY ALONG KAUFMAN STREET AND MLK JR BLVD TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXACHACHIE RELOCATION OF FACILITIES OCTOBER 2574 080.67113 8,276 RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY AND ABANDON 500 FEET OF 2 INCH POLY ALONG SHADYWOOD LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO RELOCATION OF FACILITIES OCTOBER 2575 080.67115 23,711 INSTALL 1249 FEET OF 4 INCH AND 2376 FEET OF 2 INCH POLY ALONG THE STREETS OF LARKSPUR 9. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH OCTOBER 2576 080.67138 19,989 INSTALL (1) BLACK DIAMOND WRAP TO REMEDIATE LINE D AT APPROX 4677+00 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER 2577 080.67139 21,649 INSTALL 2751 FEET OF 6 INCH POLY, 1311 FEET OF 4 INCH POLY AND 5132 FEET OF 2 INCH POLY ALONG THE STREETS OF WOLF RANCH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH NOVEMBER 2578 080.67142 27,568 RELOCATE FACILITIES. INSTALL 855 FEET OF 4 INCH POLY ALONG SOUTH 26TH STREET TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 2579 080.67162 42,615 RELOCATE FACILITIES. INSTALL 3400 FEET OF 6 INCH, 253 FEET OF 4 INCH AND 209 FEET OF 2 INCH POLY ALONG SOUTH WESTMORELAND ROAD AND ABANDON 3400 FEET OF 6 INCH, 48 FEET OF 4 INCH AND 94 FEET OF 3 INCH AND 195 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DESOTO ROAD IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO RELOCATION OF FACILITIES OCTOBER 2580 080.67166 4,408 INSTALL 740 FEET OF 2 INCH POLY ALONG RUSK STREET AND ABANDON 730 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CENTERVILLE SYSTEM INTEGRITY OCTOBER 2581 080.67167 1,155 INSTALL 350 FEET OF 2 INCH POLY ALONG S. 6TH AND ABANDON 350 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILLICOTHE SYSTEM INTEGRITY OCTOBER 2582 080.67183 7,496 RELOCATE FACILITIES. INSTALL 300 FEET OF 6 INCH POLY ALONG HERITAGE TRACE PARKWAY AND ABANDON 300 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2583 080.67210 4,329 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION 4746 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY OCTOBER 2584 080.67213 19,028 INSTALL 1100 FEET OF 2 INCH POLY ALONG HENDERSON AND ABANDON 1100 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 2585 080.67216 13,342 RELOCATE FACILITIES. INSTALL 68 FEET OF 2 INCH POLY AND ABANDON 43 FEET OF 2 INCH POLY ALONG WASHINGTON AVENUE TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 2586 080.67219 16,089 INSTALL 100 FEET OF 2 INCH AND 175 FEET OF 4 INCH POLY ALONG 17TH & AVE J AND REPLACE DRS STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON SYSTEM INTEGRITY OCTOBER 2587 080.67226 271,496 INSTALL APPROX 72 VALVES AND ABANDON A TOTAL OF APPROX 658 FEET OF STEEL OR POLY ON LOW PRESSURE SYSTEMS ACROSS SOUTH WEST WEST REGION IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 2588 080.67227 62,795 INSTALL 11 VALVES ON LOW PRESSURE SYSTEMS ACROSS SOUTH EAST EAST REGION IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 2589 080.67228 303,109 INSTALL 65 VALVES ON LOW PRESSURE SYSTEMS ACROSS NORTH WEST REGION IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2590 080.67229 24,605 INSTALL 5 VALVES ON LOW PRESSURE SYSTEMS ACROSS SE SOUTH REGION IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER MTX Additions Page 82 of 178 301 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2591 080.67230 107,367 INSTALL 23 VALVES ON LOW PRESSURE SYSTEMS ALONG SOUTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER 2592 080.67231 76,896 INSTALL 12 VALVES ON LOW PRESSURE SYSTEMS ACROSS NORTH EAST REGION IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY OCTOBER 2593 080.67232 15,418 INSTALL 7 VALVES ON LOW PRESSURE SYSTEMS ACROSS SOUTH WEST FORT WORTH REGION IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER 2594 080.67237 11,134 INSTALL 242 FEET OF 6 INCH, 3256 FEET OF 4 INCH AND 3222 FEET OF 2 INCH POLY ALONG STREETS OF WOLF RANCH WEST SECTION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH NOVEMBER 2595 080.67241 518 ABANDON 170 FEET OF 2 INCH STEEL ALONG BOURLAND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY OCTOBER 2596 080.67245 22,908 RELOCATE FACILITIES. INSTALL 650 FEET OF 2 INCH POLY ALONG LINDY LANE AND ABANDON 300 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF IRVING IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 2597 080.67250 38,971 RELOCATE FACILITIES. INSTALL 300 FEET OF 6 INCH POLY ALONG CHADBOURNE AND ABANDON 345 FEET OF 2 INCH POLY, 190 FEET OF 4 INCH POLY, 718 FEET OF 6 INCH STEEL, AND 300 FEET OF 8 INCH STEEL TO ACCOMMODATE THE CITY OF SAN ANGELO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO RELOCATION OF FACILITIES OCTOBER 2598 080.67255 2,904 RELOCATE FACILITIES. INSTALL 230 FEET OF 2 INCH POLY ALONG AMESBURY DRIVE AND ABANDON 206 FEET OF 2 INCH POLY TO ACCOMMODATE MULTI- FAMILY CONSTRUCTION. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES MARCH 2599 080.67266 12,601 REPLACE DRS05 ALONG ASH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MALONE SYSTEM INTEGRITY OCTOBER 2600 080.67267 8,754 RELOCATE FACILITIES. INSTALL 330 FEET OF 2 INCH POLY ALONG FAIRFAX AVENUE AND ABANDON 300 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF HIGHLAND PARK IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2601 080.67270 9,344 RELOCATE FACILITIES. INSTALL 116 FEET OF 4 INCH POLY AND ABANDON 20 FEET OF 4 INCH STEEL AND 102 FEET OF 4 INCH POLY ALONG COOPER DRIVE TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 2602 080.67272 825 INSTALL 396 FEET OF 6 INCH POLY, 812 FEET OF 4 INCH POLY, AND 1,379 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK . DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER 2603 080.67280 22,837 INSTALL 1175 FEET OF 2 INCH POLY AND ABANDON 634 FEET OF 2 INCH AND 4 FEET OF 4 INCH STEEL AND 102 FEET OF 2 INCH POLY ALONG KERR STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TUSCOLA SYSTEM INTEGRITY OCTOBER 2604 080.67287 14,235 RELOCATE FACILITIES. INSTALL 1530 FEET OF 2 INCH POLY AND ABANDON 175 FEET OF 4 INCH, 100 FEET OF 3 INCH STEEL, 176 FEET OF 3 INCH STEEL, 631 FEET OF 2 INCH POLY AND 365 FEET OF 1.25 INCH POLY TO ACCOMMODATE THE TXDOT WIDENING PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WINDOM RELOCATION OF FACILITIES OCTOBER 2605 080.67295 1,655 INSTALL 12,250 FEET OF 8 INCH POLY, 325 FEET OF 12 INCH STEEL ALONG FM 36. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS CADDO MILLS GROWTH APRIL 2606 080.67296 5,219 RELOCATE FACILITIES. INSTALL 569 FEET OF 2 INCH POLY AND ABANDON 533 FEET OF 2 INCH POLY ALONG COUNTY ROAD 852 TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES OCTOBER 2607 080.67322 17,097 RELOCATE FACILITIES. ABANDON 240 FEET OF 6 INCH STEEL ALONG SOUTH ELM STREET AND WEST PRAIRIE STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 2608 080.67332 15,775 RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY AND ABANDON 15 FEET OF 2 INCH POLY AND 164 FEET OF 4 INCH STEEL AND 378 FEET OF 4 INCH POLY ALONG DANIEL DRIVE TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 2609 080.67336 35,635 RELOCATE FACILITIES. INSTALL 425 FEET OF 2 INCH POLY AND 1221 FEET OF 4 INCH POLY AND ABANDON 133 FEET OF 2 INCH STEEL AND 432 FEET OF 3 INCH STEEL AND 190 FEET OF 3 INCH POLY ALONG CRINER STREET TO ACCOMMODATE CITY OF GRANDVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANDVIEW RELOCATION OF FACILITIES OCTOBER 2610 080.67339 (68) INSTALL 1225 FEET OF 2 INCH POLY, 1643 FEET OF 4 INCH POLY AND 495 FEET OF 6 INCH POLY ONSITE WITHIN THE UTILITY. COMMERCIAL OR INDUSTRIAL FRISCO GROWTH JANUARY 2611 080.67343 2,684 RELOCATE FACILITIES. INSTALL 107 FEET OF 6 INCH POLY AND ABANDON 84 FEET OF 6 INCH POLY ALONG SPRING CREEK PARKWAY TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES OCTOBER 2612 080.67346 5,975 INSTALL 388 FEET OF 2 INCH POLY ALONG ANGELINA AND ABANDON 160 FEET OF 2 INCH STEEL AND 329 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY OCTOBER 2613 080.67347 23,642 RELOCATE FACILITIES. INSTALL 1300 FEET OF 2 INCH POLY ALONG MEADOW CREST DRIVE AND ABANDON 1300 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2614 080.67350 3,895 INSTALL RELIEF VALVE AND MODIFY STATION TO REMOVE BURIED SENSE LINES ALONG 8TH STREET AND AVENUE A IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MOODY SYSTEM INTEGRITY OCTOBER 2615 080.67352 8,718 RELOCATE FACILITIES. INSTALL 670 FEET OF 2 INCH POLY ALONG SHAYNA DR AND ABANDON 670 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2616 080.67354 28,829 RELOCATE FACILITIES. INSTALL 1800 FEET OF 2 INCH POLY ALONG CASTLEROCK AND ABANDON 1800 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2617 080.67355 14,063 RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH POLY ALONG RED CLOUD AND ABANDON 800 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2618 080.67359 27,945 RELOCATE FACILITIES. INSTALL 1600 FEET OF 2 INCH POLY ALONG WEBB KAY AND ABANDON 1600 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2619 080.67362 32,833 RELOCATE FACILITIES. INSTALL 1464 FEET OF 2 INCH POLY AND ABANDON 1500 FEET OF 2 INCH STEEL ALONG DARTRIDGE ROAD TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2620 080.67363 7,586 RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH POLY ALONG GREENSPRINT DRIVE AND ABANDON 300 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2621 080.67364 24,378 RELOCATE FACILITIES. INSTALL 1430 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 2 INCH STEEL AND 1000 FEET OF 3 INCH STEEL ALONG SHADYDALE DRIVE TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2622 080.67365 13,001 RELOCATE FACILITIES. INSTALL 760 FEET OF 2 INCH POLY AND ABANDON 800 FEET OF 3 INCH STEEL ALONG BUXHILL DRIVE TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER MTX Additions Page 83 of 178 302 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2623 080.67366 27,551 RELOCATE FACILITIES. INSTALL 1200 FEET OF 2 INCH POLY ALONG JOYCE WAY AND ABANDON 1200 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2624 080.67370 82,146 RELOCATE FACILITIES. INSTALL 3010 FEET OF 2 INCH, 2185 FEET OF 4 INCH AND 160 FEET OF 6 INCH POLY ALONG 3RD, LYNN, ROBINSON AND ABANDON 5000 FEET OF 2 INCH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR RELOCATION OF FACILITIES OCTOBER 2625 080.67372 5,919 INSTALL 830 FEET OF 2 INCH POLY ALONG DAVIS BOULEVARD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL NORTH RICHLAND HILLS GROWTH SEPTEMBER 2626 080.67378 1,590 RELOCATE FACILITIES. INSTALL 291 FEET OF 2 INCH POLY AND ABANDON 584 FEET OF 2 INCH STEEL ALONG NORTHHAVEN PLAZA TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2627 080.67381 597 INSTALL 500 FEET OF 4 INCH POLY ALONG ANNA AND ABANDON 200 FEET OF 2 INCH AND 300 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY OCTOBER 2628 080.67388 409 INSTALL 2,975 FEET OF 2 INCH POLY ALONG THE STREETS OF HARVEST TOWNSIDE PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL NORTHLAKE GROWTH MARCH 2629 080.67389 14,390 INSTALL 446 FEET OF 2 INCH POLY ALONG HUTTO TRACT E IN WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITY. COMMERCIAL OR INDUSTRIAL HUTTO GROWTH DECEMBER 2630 080.67390 5,904 RELOCATE FACILITIES. INSTALL 120 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 4 INCH POLY ALONG RANDOL MILL ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2631 080.67397 42,316 RELOCATE FACILITIES. INSTALL 1585 FEET OF 4 INCH POLY AN 60 FEET OF 6 INCH POLY AND ABANDON 975 FEET OF 4 INCH, 285 FEET OF 6 INCH CAST IRON, 200 FEET OF 4 INCH STEEL AND 75 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2632 080.67401 16,750 RELOCATE FACILITIES. INSTALL 577 FEET OF 2 INCH POLY AND ABANDON 319 FEET OF 2 INCH STEEL AND 1 FEET OF 2 INCH POLY ALONG ELLIS AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2633 080.67403 1,966 INSTALL 320 FEET OF 2 INCH POLY ALONG BURNETT AND ABANDON 320 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2634 080.67409 405 ABANDON 130 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER 2635 080.67422 34,367 RELOCATE FACILITIES. INSTALL 634 FEET OF 4 INCH POLY AND ABANDON 580 FEET OF 4 INCH STEEL ALONG LITTLE STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2636 080.67436 38,550 RELOCATE FACILITIES. INSTALL 860 FEET OF 2 INCH, 600 FEET OF 4 INCH AND 440 FEET OF 6 INCH POLY ALONG MILLS STREET AND ABANDON 1900 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF TAYLOR IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR RELOCATION OF FACILITIES OCTOBER 2637 080.67455 112,030 RELOCATE FACILITES. INSTALL 5335 FEET OF 4 INCH AND 325 FEET OF 2 INCH POLY ALONG BELLVIEW AND ABANDON 150 FEET OF 6 INCH POLY AND 10 FEET OF 6 INCH STEEL AND 3380 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF SULPHUR SPRINGS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS RELOCATION OF FACILITIES OCTOBER 2638 080.67468 317 ABANDON DISTRICT REGULATOR STATION 159 IN FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2639 080.67469 19,808 INSTALL 600 FEET OF 2 INCH AND 75 FEET OF 4 INCH POLY ABANDON DRS#01 IN WHITESBORO AND 62 FEET OF 4 INCH STEEL AND 22 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITESBORO SYSTEM INTEGRITY OCTOBER 2640 080.67478 5,354 RELOCATE FACILITIES. INSTALL 130 FEET OF 4 INCH POLY AND ABANDON 140 FEET OF 4 INCH POLY ALONG PARKER ROAD TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES OCTOBER 2641 080.67495 609 ABANDON DISTRICT REGULATOR STATION 142 IN DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2642 080.67497 23,835 INSTALL 1027 FEET OF 2 INCH POLY AND ABANDON 6 FEET OF 2 INCH POLY AND 766 FEET OF 4 INCH STEEL ALONG SAINT THOMAS DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY OCTOBER 2643 080.67498 45,238 INSTALL 150 FEET OF 2 INCH AND 1995 FEET OF 4 INCH POLY SOUTH LINGLEVILLE ROAD AND ABANDON 213 FEET OF 3 INCH AND 1697 FEET OF 2 INCH STEEL AND 442 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY OCTOBER 2644 080.67544 678 ABANDON DISTRICT REGULATOR STATION #112 IN UNIVERSITY PARK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2645 080.67551 9,284 INSTALL 288 FEET OF 2 INCH POLY AND ABANDON 196 FEET OF 2 INCH STEEL AND 246 FEET OF 3 INCH STEEL ALONG 15TH STREET AND HICKORY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLORADO CITY SYSTEM INTEGRITY OCTOBER 2646 080.67556 21,721 RELOCATE FACILITIES. INSTALL (10) .75 INCH POLY SERVICES AND ABANDON (10) .75 INCH POLY SERVICES ALONG CAT MOUNTAIN TO ACCOMMODATE THE CITY OF KELLER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER RELOCATION OF FACILITIES OCTOBER 2647 080.67560 3,144 INSTALL 113 FEET OF 2 INCH POLY AND ABANDON 309 FEET OF 3 INCH CAST IRON ALONG GRACE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2648 080.67562 19,281 INSTALL 190 FEET OF 2 INCH AND 60 FEET OF 6 INCH POLY ALONG FM 1138 AND ABANDON 190 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NEVADA SYSTEM INTEGRITY OCTOBER 2649 080.67566 60,483 RELOCATE FACILITIES. INSTALL 1300 FEET OF 2 INCH POLY ALONG BRYN MAWR DR AND ABANDON 1300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2650 080.67573 43,732 INSTALL 500 FEET OF 6 INCH POLY, 2000 FEET OF 4 INCH POLY AND 7100 FEET OF 2 INCH POLY ALONG THE STREETS OF WATERSCAPE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH DECEMBER 2651 080.67580 10,774 INSTALL 3 FEET OF 2 INCH POLY AND 950 FEET OF 4 INCH POLY AND ABANDON 1256 FEET OF 2 INCH STEEL AND 4 FEET OF 2 INCH POLY ALONG KEGLEY LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER 2652 080.67583 2,611 RELOCATE FACILITIES. INSTALL 25 FEET OF 4 INCH POLY AND ABANDON 20 FEET OF 3 INCH POLY ALONG TREZEVANT STREET TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2653 080.67589 1,180 INSTALL 2 INCH VALVE ON DRS 02 IN OLNEY AND ABANDON 2 INCH VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY SYSTEM INTEGRITY OCTOBER 2654 080.67590 65,874 RELOCATE FACILITIES. INSTALL 3200 FEET OF 6 INCH POLY AND 200 FEET OF 4 INCH POLY ALONG PARKER ROAD AND CUSTER PKWY AND ABANDON 2900 FEET OF 6 INCH IP POLY MAIN, 500 FEET OF 4 INCH IP POLY MAIN AND 100 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF PLANO STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES OCTOBER 2655 080.67592 5,258 RELOCATE FACILITIES. INSTALL 200 FEET OF 6 INCH POLY AND ABANDON 175 FEET OF 6 INCH POLY ALONG HARMON ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER MTX Additions Page 84 of 178 303 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2656 080.67597 6,194 RELOCATE FACILITIES. INSTALL 290 FEET OF 4 INCH POLY AND 3 FEET OF 6 INCH POLY AND 4 FEET OF 8 INCH POLY AND ABANDON 50 FEET OF 8 INCH STEEL AND 60 FEET OF 8 INCH POLY ALONG PETER SMITH STREET AND HEMPHILL STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2657 080.67598 42 ABANDON 6 FEET OF 6 INCH POLY AND 2 FEET OF 8 INCH POLY ALONG HOWELL AND ROUTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2658 080.67604 39,091 RELOCATE FACILITIES. INSTALL 1500 FEET OF 8 INCH AND 250 FEET OF 2 INCH POLY AND ABANDON 422 FEET OF 6 INCH AND 397 FEET OF 4 INCH AND 494 FEET OF 6 INCH AND 451 FEET OF 4 INCH STEEL ALONG CLIFT STREET TO ACCOMMODATE THE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE RELOCATION OF FACILITIES OCTOBER 2659 080.67610 85,061 RELOCATE FACILITIES. INSTALL 3500 FEET OF 4 INCH AND 750 FEET OF 2 INCH POLY ALONG RAMEY AVENUE AND ABANDON 4040 FEET OF 4 INCH, 60 FEET OF 3 INCH AND 280 FEET OF 2 INCH STEEL AND 1270 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2660 080.67623 2,203 RELOCATE FACILITIES. INSTALL (5) .75 INCH POLY SERVICES ALONG CLIFFSIDE DRIVE AND ABANDON (5) .75 INCH POLY SERVICES TO ACCOMMODATE RIHCARDSON ALLEY PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES OCTOBER 2661 080.67626 2,779 RELOCATE FACILITIES. INSTALL 23 FEET OF 4 INCH POLY AND ABANDON 16 FEET OF 2 INCH POLY ALONG CROSSLAKE PARKWAY TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 2662 080.67629 1,024 REPLACE OBSOLETE RELIEF VALVE ON DRS38 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER 2663 080.67631 32,737 RELOCATE FACILITIES. INSTALL 1000 FEET OF 4 INCH AND 950 FEET OF 2 INCH POLY ALONG SOUTH FOURTH AT MARY AVENUE AND ABANDON 445 FEET OF 6 INCH, 124 FEET OF 4 INCH, 16 FEET OF 3 INCH AND 47 FEET OF 2 INCH STEEL AND 394 FEET OF POLY TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 2664 080.67644 5,979 RELOCATE FACILITIES. INSTALL 1340 FEET OF 2 INCH POLY ALONG WASHINGTON ST AND ABANDON 1320 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE RELOCATION OF FACILITIES OCTOBER 2665 080.67672 9,658 ABANDON 26 MOTORIZED REGULATORS AND INSTALL 26 MOTORIZED REGULATORS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2666 080.67682 17,423 RELOCATE FACILITIES. ABANDON 107 FEET OF 2 INCH STEEL AND 870 FEET OF 2 INCH POLY RAMEY AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2667 080.67683 311 ABANDON DRS 154 IN THE VICINITY OF WEST WAGGOMAN AND LIVINGSTON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2668 080.67688 6,736 RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH POLY AND ABANDON 107 FEET OF 2 INCH POLY ALONG WENZ AVENUE AND MACARTHUR DRIVE TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 2669 080.67720 43,511 RELOCATE FACILITIES. INSTALL 560 FEET OF 12 INCH POLY AND 180 FEET OF 2 INCH POLY ALONG 9TH AVENUE AND ABANDON 540 FEET OF 12 INCH STEEL AND 190 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2670 080.67727 7,544 RELOCATE FACILITIES. INSTALL 394 FEET OF 4 INCH POLY AND 3 FEET OF 8 INCH POLY AND ABANDON 60 FEET OF 4 INCH POLY AND 337 FEET OF 8 INCH POLY ALONG STONEBRIDGE DRIVE TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES OCTOBER 2671 080.67731 5,676 RELOCATE FACILITIES. INSTALL 80 FEET OF 4 INCH POLY ALONG WOOD STREET AND ABANDON 80 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF MCKINNEY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES OCTOBER 2672 080.67748 11,935 RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH POLY ALONG APRIL HILL ALLEY AND ABANDON 800 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2673 080.67753 10,150 INSTALL 416 FEET OF 2 INCH POLY AND ABANDON 1021 FEET OF 2 INCH STEEL AND 15 FEET OF 2 INCH POLY ALONG MCKINNEY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER 2674 080.67754 13,113 INSTALL 375 FEET OF 2 INCH POLY AND ABANDON 447 FEET OF 3 INCH, 241 FEET OF 2 INCH STEEL, AND DISTRICT REGLUATOR STATION 10 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PETROLIA SYSTEM INTEGRITY OCTOBER 2675 080.67757 64 ABANDON DISTRICT REGULATOR STATION #023 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2676 080.67766 2,983 INSTALL 835 FEET OF 2 INCH POLY ALONG FANNIN ROAD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL MELISSA GROWTH MARCH 2677 080.67772 39 ABANDON DISTRICT REGULATOR STATION #222 IN DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2678 080.67774 597 ABANDON DISTRICT REGULATOR STATION 029 IN DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2679 080.67782 78,084 RELOCATE FACILITIES. INSTALL 3600 FEET OF 4 INCH AND 100 FEET OF 6 INCH POLY ALONG RAMEY AVENUE AND ABANDON 3550 FEET OF 4 INCH, 50 FEET OF 3 INCH AND 100 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2680 080.67783 10,972 INSTALL 288 FEET OF 2 INCH POLY AND ABANDON 280 FEET OF 2 INCH STEEL AND 4 FEET OF 2 INCH POLY ALONG BALLINGER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 2681 080.67791 27,835 INSTALL 900 FEET OF 4 INCH AND 2,451 FEET OF 2 INCH POLY ALONG THE STREETS OF LARKSPUR. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH OCTOBER 2682 080.67792 193,901 INSTALL 11 FEET OF 2 INCH POLY AND 5 FEET OF 4 INCH POLY AND 22 FEET OF 6 INCH POLY AND 2129 FEET OF 12 INCH POLY AND ABANDON 2115 FEET OF 12 INCH STEEL ALONG BECKLEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2683 080.67806 7,868 RELOCATE FACILITIES. INSTALL 135 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG FOREST VISTA DRIVE AND ABANDON 135 FEET OF 3 INCH AND 150 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF FLOWER MOUND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND RELOCATION OF FACILITIES OCTOBER 2684 080.67824 183 INSTALL 875 FEET OF 2 INCH POLY ALONG HIGHWAY 377. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL STEPHENVILLE GROWTH JUNE 2685 080.67825 62,348 INSTALL 3 FEET OF 3 INCH POLY AND 35 FEET OF 4 INCH POLY AND 1527 FEET OF 12 INCH POLY AND ABANDON 15 FEET OF 3 INCH STEEL AND 23 FEET OF 4 INCH STEEL AND 4 FEET OF 4 INCH POLY AND 1497 FEET OF 10 INCH STEEL ALONG ELMWOOD AND BROOKHOLLOW IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 2686 080.67826 62,548 INSTALL 18 FEET OF 6 INCH POLY AND 2817 FEET OF 12 INCH POLY AND ABANDON 36 FEET OF 6 INCH STEEL AND 3008 FEET OF 10 INCH STEEL AND 102 FEET OF 12 INCH POLY ALONG MAPLE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER MTX Additions Page 85 of 178 304 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2687 080.67827 193,736 RELOCATE FACILITIES. INSTALL 4400 FEET OF 2 INCH POLY AND ABANDON 1370 FEET OF 1.25 INCH, 850 FEET OF 2 INCH, 670 FEET OF 2 INCH STEEL, 432 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2688 080.67829 9,984 INSTALL 400 FEET OF 2 INCH AND 50 FEET OF 4 INCH POLY AND ABANDON 241 FEET OF 2 INCH AND 159 FEET OF 4 INCH STEEL AND 18 FEET OF 2 INCH POLY AND REPLACE DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OKLAUNION SYSTEM INTEGRITY OCTOBER 2689 080.67833 21,838 RELOCATE FACILITIES. INSTALL 480 FEET OF 4 INCH POLY AND ABANDON 475 FEET OF 2 INCH STEEL ALONG DAVIS STREET TO ACCOMMODATE CITY OF WEST STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST RELOCATION OF FACILITIES OCTOBER 2690 080.67843 28,153 INSTALL 2460 FEET OF 2 INCH POLY AND 3060 FEET OF 4 INCH POLY ALONG THE STREETS OF HUNTERS RUN IN THE LIBERTY SUBDIVISION. RESIDENTIAL MELISSA GROWTH MARCH 2691 080.67846 374 ABANDON DISTRICT REGULATOR STATION 153 ALONG BOWIE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2692 080.67854 3,776 REPLACE DISTRICT REGULATOR STATION 24 ALONG SOUTH 18TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER 2693 080.67855 18,445 RELOCATE FACILITIES. INSTALL 2699 FEET OF 4 INCH POLY AND ABANDON 2655 FEET OF 4 INCH POLY TO ACCOMODATE TXDOT IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LLANO RELOCATION OF FACILITIES OCTOBER 2694 080.67860 6,738 INSTALL 57 FEET OF 2 INCH POLY AND 84 FEET OF 4 INCH POLY AND ABANDON 7 FEET OF 2 INCH STEEL AND 12 FEET OF 4 INCH STEEL ALONG CHINA STREET AND HANNA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALVERT SYSTEM INTEGRITY OCTOBER 2695 080.67873 2,941 INSTALL DISTRICT REGULATOR STATION IN DENTON AND ABANDON DISTRICT REGULATOR STATION DRS49 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER 2696 080.67887 15,894 INSTALL 840 FEET OF 4 INCH POLY AND ABANDON 772 FEET OF 3 INCH STEEL ALONG COLLINS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 2697 080.67888 15,068 RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY AND ABANDON 225 FEET OF 4 INCH STEEL ALONG LD LOCKET ROAD TO ACCOMMODATE THE CITY OF COLLEYVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE RELOCATION OF FACILITIES OCTOBER 2698 080.67893 30,131 INSTALL 26 FEET OF 3 INCH POLY AND 1295 FEET OF 8 INCH POLY AND ABANDON 14 FEET OF 3 INCH STEEL AND 1285 FEET OF 8 INCH STEEL ALONG THE STEETS OF KENSINGTON VALLEY SUBDIVISION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEAGOVILLE SYSTEM INTEGRITY OCTOBER 2699 080.67895 12,583 INSTALL 800 FEET OF 2 INCH POLY AND ABANDON 615 FEET OF 4 INCH STEEL AND 105 FEET OF 4 INCH POLY ALONG ARMSTRONG IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLOOMING GROVE SYSTEM INTEGRITY OCTOBER 2700 080.67908 21,293 RELOCATE FACILITIES. INSTALL 487 FEET OF 2 INCH POLY AND ABANDON 487 FEET OF 2 INCH STEEL ALONG NANTUCKET TO ACCOMMODATE CITY OF RICHARDSON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES OCTOBER 2701 080.67909 8,661 INSTALL 330 FEET OF 2 INCH POLY AND ABANDON 310 FEET OF 4 INCH STEEL AND GAINESVILLE DRS08 (S203) IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE SYSTEM INTEGRITY OCTOBER 2702 080.67911 19,135 INSTALL 1270 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION # 10 IN GAINESVILLE AND 2283 FEET OF 2 INCH STEEL AND POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE SYSTEM INTEGRITY OCTOBER 2703 080.67912 23,207 INSTALL 170 FEET OF 2 INCH AND 325 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION 19 AND ABANDON DISTRICT REGULATOR STATION 19 AND 43 FEET OF 4 INCH AND 198 FEET OF 2 INCH BARE STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE SYSTEM INTEGRITY OCTOBER 2704 080.67913 6,327 INSTALL DISTRICT REGULATOR STATION ALONG STREETS OF NOCONA AND ABANDON DISTRICT REGULATOR STATION 15 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA SYSTEM INTEGRITY OCTOBER 2705 080.67920 3,040 INSTALL 4560 FEET OF 2 INCH POLY ALONG THE STREETS OF ANNA CROSSING. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ANNA GROWTH MARCH 2706 080.67930 64,472 INSTALL 647 FEET OF 2 INCH POLY AND 59 FEET OF 6 INCH POLY AND 29 FEET OF 8 INCH POLY AND 1185 FEET OF 12 INCH POLY AND ABANDON 585 FEET OF 2 INCH STEEL AND 617 FEET OF 6 INCH STEEL AND 839 FEET OF 10 INCH STEEL ALONG T LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 2707 080.67933 35,416 RELOCATE FACILITIES. INSTALL 35 POLY SERVICES ALONG MIRIAM LANE AND ABANDON 35 POLY SERVICES ALONG MIRIAM LANE TO ACCOMMODATE THE CITY OF ARLINGTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 2708 080.67934 7,644 RELOCATE FACILITIES. INSTALL 506 FEET OF 2 INCH POLY AND ABANDON 490 FEET OF 2 INCH POLY ALONG LONGWORTH BOULEVARD TO ACCOMMODATE CITY OF DUNCANVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE RELOCATION OF FACILITIES OCTOBER 2709 080.67939 156 ABANDON DISTRICT REGULATOR STATION IN COLEMAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY OCTOBER 2710 080.67946 551 ABANDON DISTRICT REGULATOR STATION ALONG NW 32ND STREET AND ELLIS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2711 080.67952 4,890 REPLACE DENISON DISTRICT REGULATOR STATION 40 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER 2712 080.67953 9,174 INSTALL DISTRICT REGULATOR STATION 02 ALONG KING STREET AND 4TH STREET IN BELLEVUE, TX AND ABANDON DISTRICT REGULATOR STATION 02 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELLEVUE SYSTEM INTEGRITY OCTOBER 2713 080.67955 12,265 INSTALL DISTRICT REGULATOR STATION 05 ALONG W SOUTH STREET IN ARCHER CITY AND ABANDON DISTRICT REGULATOR STATION 05 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARCHER CITY SYSTEM INTEGRITY OCTOBER 2714 080.67956 11,327 INSTALL DISTRICT REGULATOR STATION 08 ALONG VINE AND MAIN STREET IN ARCHER CITY AND ABANDON DISTRICT REGULATOR STATION 08 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARCHER CITY SYSTEM INTEGRITY OCTOBER 2715 080.67957 11,026 REPLACE ARCHER CITY DRS09 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARCHER CITY SYSTEM INTEGRITY OCTOBER 2716 080.67959 7,796 INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 119 FEET OF 2 INCH STEEL AND 30 FEET OF 2 INCH POLY AND REPLACE ARCHER CITY DRS13 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARCHER CITY SYSTEM INTEGRITY OCTOBER 2717 080.67961 9,130 REPLACE BYERS DRS02 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS BYERS SYSTEM INTEGRITY OCTOBER 2718 080.67962 7,419 REPLACE DISTRICT REGULATOR STATION 4 IN BYERS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BYERS SYSTEM INTEGRITY OCTOBER 2719 080.67964 4,499 INSTALL CLOCK SPRING ALONG LINE F IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY OCTOBER 2720 080.67966 14,737 INSTALL DISTRICT REGULATOR STATION 03 ALONG GARRISON AVENUE AND DALLAS STREET IN ELECTRA, TX AND ABANDON DISTRICT REGULATOR STATION 03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY OCTOBER 2721 080.67967 6,640 REPLACE ELECTRA DRS09 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY OCTOBER 2722 080.67968 8,728 INSTALL DISTRICT REGULATOR STATION 011 ALONG GARRISON AVENUE AND NORTH ILLINOIS STREET IN ELECTRA, TX AND ABANDON DISTRICT REGULATOR STATION 011 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY OCTOBER 2723 080.67969 6,526 INSTALL 140 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY AND ABANDON 11 FEET OF 6 INCH, 75 FEET OF 4 INCH AND 30 FEET OF 2 INCH STEEL AND 15 FEET OF 6 INCH POLY AND REPLACE HENRIETTA DRS04 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY OCTOBER MTX Additions Page 86 of 178 305 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2724 080.67970 8,766 REPLACE HENRIETTA DISTRICT REGULATOR STATION 09 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY OCTOBER 2725 080.67971 23,186 INSTALL 1,085 OF POLY MAIN ALONG PAYNE AND ABANDON 988 FEET OF STEEL AND ABANDON DISTRICT REGULATOR STATION 12 IN OLNEY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY SYSTEM INTEGRITY OCTOBER 2726 080.67972 17,012 INSTALL 1,030 FEET OF 2 INCH POLY AND ABANDON 1,197 FEET OF 2 INCH STEEL, 136 FEET OF 2 INCH POLY, 20 FEET OF 2 INCH STEEL, 5 FEET OF 4 INCH, AND 27 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION #14 IN OLNEY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY SYSTEM INTEGRITY OCTOBER 2727 080.67973 24,452 INSTALL 1000 FEET OF 2 INCH POLY AND ABANDON 7 FEET OF 4 INCH STEEL, 984 FEET OF 3 INCH STEEL AND 20 FEET OF 2 INCH STEEL AND 274 FEET OF 3 INCH POLY AND 244 FEET OF 2 INCH POLY ALONG GALLOWAY DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY SYSTEM INTEGRITY OCTOBER 2728 080.67974 15,970 INSTALL 750 FEET OF 2 INCH POLY AND ABANDON 785 FEET OF POLY AND ABANDON DISTRICT REGULATOR STATION 45 ALONG W MAIN AND S AVENUE K IN OLNEY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY SYSTEM INTEGRITY OCTOBER 2729 080.67988 1,527 INSTALL 45 FEET OF 2 INCH POLY ALONG LOOP 13 AND ABANDON 42 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER 2730 080.68023 8,800 INSTALL 3 FEET OF 3 INCH POLY AND 525 FEET OF 4 INCH POLY AND ABANDON 528 FEET OF 3 INCH STEEL ALONG DOUGLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARLSBAD SYSTEM INTEGRITY OCTOBER 2731 080.68029 27,477 INSTALL 80 FEET OF 4 INCH STEEL ALONG LINE U10 AND ABANDON 80 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KNOX CITY SYSTEM INTEGRITY OCTOBER 2732 080.68047 12,524 RELOCATE FACILITIES. INSTALL 915 FEET OF 2 INCH POLY AND ABANDON 513 FEET OF 2 INCH STEEL ALONG DANIEL DRIVE TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 2733 080.68063 7,552 RELOCATE FACILITIES. INSTALL 376 FEET OF 4 INCH POLY AND ABANDON 30 FEET OF 2 INCH POLY AND 350 FEET OF 4 INCH POLY ALONG BOAZ ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2734 080.68078 17,710 INSTALL 1450 FEET OF 2 INCH POLY AND ABANDON 434 FEET OF 4 INCH STEEL AND 441 FEET OF 2 INCH STEEL AND 372 FEET OF 4 INCH POLY AND 238 FEET OF 2 INCH POLY ALONG WALNUT STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2735 080.68081 34,956 INSTALL 1500 FEET OF 4 INCH POLY AND ABANDON 1650 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 2736 080.68093 1,980 INSTALL 7,305 FEET OF 8 INCH POLY ALONG ROADWAY OF TRADITION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH APRIL 2737 080.68108 11,330 RELOCATE FACILITIES. INSTALL 682 FEET OF 2 INCH POLY AND ABANDON 682 FEET OF 2 INCH POLY ALONG BEALL STREET TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2738 080.68110 12,919 INSTALL 160 FEET OF 2 INCH POLY ALONG 6TH STREET DUE TO CUSTOMER GROWTH. ALL CUSTOMERS PRINCETON GROWTH NOVEMBER 2739 080.68118 322 RELOCATE FACILITIES. ABANDON 836 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW RELOCATION OF FACILITIES OCTOBER 2740 080.68124 4,627 INSTALL 4750 FEET OF 2 INCH AND 930 FEET OF 6 INCH POLY ALONG THE STREETS OF ANNA RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ANNA GROWTH APRIL 2741 080.68128 52,102 RELOCATE FACILITIES. INSTALL 568 FEET OF 4 INCH POLY AND ABANDON 367 FEET OF 3 INCH POLY AND 128 FEET OF 4 INCH POLY ALONG US 281 TO ACCOMMODATE CITY OF MARBLE FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARBLE FALLS RELOCATION OF FACILITIES OCTOBER 2742 080.68157 41,362 RELOCATE FACILITIES. INSTALL 2300 FEET OF 6 INCH ALONG NORTH RIVERSIDE DRIVE AND ABANDON 2175 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2743 080.68162 30 INSTALL 5830 FEET OF 4 INCH POLY AND 5850 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKEPOINTE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LAVON GROWTH JANUARY 2744 080.68185 801 INSTALL 100 FEET OF 2 INCH POLY ALONG NORMAN DRIVE IN EULESS TX. RESIDENTIAL EULESS GROWTH MARCH 2745 080.68209 42,257 INSTALL 2500 FEET OF 4 INCH POLY AND 900 FEET OF 2 INCH POLY ALONG W HENDERSON STREET AND ABANDON 1200 FEET OF 4 INCH POLY AND 450 FEET OF 4 INCH STEEL AND 360 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER 2746 080.68212 46,104 RELOCATE FACILITIES. REPLACE 84 SERVICE LINES ALONG ALBERMARLE DRIVE AND BURGESS DRIVE AND DARLA DRIVE AND EVEREST DRIVE TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2747 080.68225 6,277 REPLACE GROUND BED ON LINE D17-4 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WYLIE SYSTEM INTEGRITY OCTOBER 2748 080.68240 92,652 INSTALL 2050 FEET OF 2 INCH POLY AND ABANDON 890 FEET OF 3 INCH CAST IRON, 265 FEET OF 4 INCH CAST IRON, 420 FEET OF 6 INCH CAST IRON, AND 450 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2749 080.68245 26,490 INSTALL 1650 FEET OF 2 INCH POLY AND ABANDON 5 FEET OF 2 INCH CAST IRON, 800 FEET OF 4 INCH CAST IRON, 455 FEET OF 2 INCH STEEL, 130 FEET OF 2 INCH CAST IRON AND 100 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2750 080.68248 80,161 INSTALL 1520 FEET OF 4 INCH POLY AND ABANDON 1520 FEET OF 8 INCH CAST IRON ALONG CARPENTER AVENUE IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2751 080.68252 43,194 INSTALL 1465 FEET OF 4 INCH POLY AND ABANDON 90 FEET OF 2 INCH CAST IRON, 85 FEET OF 4 INCH CAST IRON AND 1380 FEET OF 8 INCH CAST IRON ALONG STONEWALL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2752 080.68253 44,851 INSTALL 2450 FEET OF 4 INCH POLY AND ABANDON 1420 FEET OF 4 INCH STEEL AND 985 FEET OF 4 INCH POLY AND 510 FEET OF 6 INCH CAST IRON ALONG AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2753 080.68255 37,887 INSTALL 1600 FEET OF POLY AND ABANDON 278 FEET OF 4 INCH STEEL AND 20 FEET OF 4 INCH POLY AND 699 FEET OF 6 INCH CAST IRON AND 724 FEET OF 6 INCH POLY ALONG BYERS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2754 080.68256 63,211 INSTALL 825 FEET OF 4 INCH POLY, 3000 FEET OF 2 POLY AND ABANDON 1200 FEET OF 4 INCH CAST IRON, 1560 FEET OF 4 INCH STEEL, 1475 FEET OF 6 INCH STEEL ALONG W. HAMMOND STREET IN FORT WORTH TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2755 080.68258 6,977 REPLACE GROUND BED ALONG LINE O28-6 AND RECTIFIER GROUND BED ALONG LINE O28 IN WYLIE, TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WYLIE SYSTEM INTEGRITY OCTOBER 2756 080.68259 33,974 INSTALL 2000 FEET OF 4 POLY AND ABANDON 2000 FEET OF 6 INCH CAST IRON ALONG W. HAMMOND STREET IN FORT WORTH TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2757 080.68261 39,585 INSTALL 2500 FEET OF 4 INCH POLY AND ABANDON 633 FEET OF 4 INCH STEEL AND 1605 FEET OF 6 INCH CAST IRON ALONG STREETS OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER MTX Additions Page 87 of 178 306 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2758 080.68262 40,276 INSTALL 1440 FEET OF 2 INCH POLY AND ABANDON 570 FEET OF 2 INCH CAST IRON, 45 FEET OF 2 INCH POLY, 125 FEET OF 2 INCH STEEL ALONG HOBSON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2759 080.68264 81,995 INSTALL 235 FEET OF 2 INCH POLY AND 1460 FEET OF 4 INCH POLY AND ABANDON 1595 FEET OF 4 INCH CAST IRON ALONG BUENA VISTA STREET AND LEE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2760 080.68266 3,103 RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 150 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2761 080.68269 22,943 INSTALL 1310 FEET OF 2 INCH POLY AND ABANDON 1210 FEET OF 4 INCH CAST IRON AND 100 FEET OF 4 INCH STEEL ALONG OWENWOOD AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2762 080.68271 59,669 INSTALL 2090 FEET OF 2 INCH POLY AND ABANDON 2005 FEET OF 4 INCH, 20 FEET OF 6 INCH CAST IRON AND 65 FEET OF 4 INCH POLY ALONG ALASKA AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2763 080.68272 7,262 REPLACE DISTRICT REGULATOR STATION #25 IN MARLIN AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY OCTOBER 2764 080.68273 7,746 REPLACE DISTRICT REGULATOR STATION #14 IN MARLIN AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY OCTOBER 2765 080.68278 14,110 INSTALL 6 FEET OF 3 INCH POLY AND 279 FEET OF 4 INCH POLY AND 1 FEET OF 6 INCH POLY AND ABANDON 134 FEET OF 4 INCH STEEL AND 21 FEET OF 4 INCH POLY AND 140 FEET OF 6 INCH STEEL AND 2 FEET OF 6 INCH POLY ALONG MESQUITE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY OCTOBER 2766 080.68279 10,857 INSTALL DISTRICT REGULATOR STATION 03 ALONG MESQUITE STREET AND BORDEN STREET IN ABBOTT, TX AND ABANDON DISTRICT REGULATOR STATION 03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABBOTT SYSTEM INTEGRITY OCTOBER 2767 080.68287 10,134 RELOCATE FACILITES. INSTALL 458 FEET OF 2 INCH POLY ALONG MIMOSA STREET AND ABANDON 349 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF KEERVILLE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES OCTOBER 2768 080.68294 8,129 REPLACE DISTRICT STATION #03 IN BREMOND AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BREMOND SYSTEM INTEGRITY OCTOBER 2769 080.68309 20,759 INSTALL 1760 FEET OF 2 INCH POLY MAIN ALONG LAHOMA STREET AND ABANDON 915 FEET OF 4 INCH CAST IRON, 775 FEET OF 6 INCH CAST IRON, AND 70 FEET OF 4 INCH STEEL MAIN IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2770 080.68310 132,833 INSTALL 3130 FEET OF 2 INCH POLY AND ABANDON 2255 FEET OF 4 INCH CAST IRON AND 750 FEET OF 4 INCH POLY ALONG OPAL AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2771 080.68312 58,004 INSTALL 450 FEET OF 2 INCH POLY AND 1365 FEET OF 4 INCH POLY AND ABANDON 675 FEET OF 2 INCH CAST IRON AND 1075 FEET OF 4 INCH CAST IRON ALONG FORDHAM ROAD IN ACORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2772 080.68313 27,789 INSTALL 1390 FEET OF 2 INCH POLY ALONG MARYLAND AVENUE AND ABANDON 665 FEET OF 4 INCH CAST IRON, 520 FEET OF 2 INCH POLY, 170 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2773 080.68314 50,937 INSTALL 2200 FEET OF 4 INCH POLY AND ABANDON 660 FEET OF 4 INCH CAST IRON, 350 FEET OF 6 INCH CAST IRON, 1225 FEET OF 4 INCH STEEL ALONG W. BOYCE AVENUE IN FORT WORTH TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2774 080.68315 33,189 INSTALL 1350 FEET OF 4 INCH POLY AND ABANDON 1250 FEET OF 4 INCH CAST IRON AND 375 FEET OF 6 INCH POLY ALONG RYAN AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2775 080.68316 33,279 INSTALL 1844 FEET OF 4 INCH POLY AND ABANDON 1950 FEET OF 4 INCH CAST IRON AND 232 FEET OF POLY ALONG WAGGOMAN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2776 080.68318 43,087 INSTALL 2000 FEET OF 4 INCH STEEL AND ABANDON 2005 FEET OF 4 INCH CAST IRON AND 500 FEET OF 6 INCH CAST IRON ALONG W. BOYCE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2777 080.68335 3,558 REPLACE DISTRICT REGULATOR STATION #18 IN MARLIN AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY OCTOBER 2778 080.68337 1,152 ABANDON DISTRICT REGULATOR STATION #22 IN TAYLOR IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR SYSTEM INTEGRITY OCTOBER 2779 080.68344 62,385 INSTALL COMPOSITE WRAP ON LINE D IN DALLAS COUNTY TO REMEDIATE ANOMALIES. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2780 080.68346 5,508 INSTALL 61 FEET OF 2 INCH POLY AND 180 FEET OF 4 INCH POLY AND ABANDON 10 FEET OF 2 INCH POLY AND 98 FEET OF 3 INCH STEEL AND 282 FEET OF 4 INCH STEEL ALONG MARKET STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BAIRD SYSTEM INTEGRITY OCTOBER 2781 080.68349 3,058 RELOCATE FACILITIES. INSTALL 30 FEET OF 6 INCH POLY ALONG SMITHFIELD ROAD AND ABANDON 20 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF NORTH RICHLAND HILLS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTH RICHLAND HILLS RELOCATION OF FACILITIES OCTOBER 2782 080.68353 28 INSTALL 2170 FEET 4 INCH, AND 5770 FEET OF 2 INCH POLY ALONG STREETS OF SOUTHPOINTE PHASE 5 SUBDIVISION. RESIDENTIAL MANSFIELD GROWTH JANUARY 2783 080.68360 23,866 RELOCATE FACILITIES. INSTALL&NBSP; 531 FEET OF 6 INCH POLY AND ABANDON 500 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2784 080.68361 35,987 RELOCATE FACILITIES. INSTALL 1159 FEET OF 2 INCH POLY AND 86 FEET OF 4 INCH POLY AND ABANDON 1153 FEET OF 2 INCH STEEL AND 75 FEET OF 4 INCH STEEL ALONG BROOKHOLLOW DRIVE TO ACCOMMODATE CITY OF WOODWAY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WOODWAY RELOCATION OF FACILITIES OCTOBER 2785 080.68365 10,550 RELOCATE FACILITIES. INSTALL 360 FEET OF 4 INCH POLY AND ABANDON 360 FEET OF 4 INCH STEEL ALONG MCHILHANEY STREET AND MARY STREET TO ACCOMMODATE CITY OF STEPHENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE RELOCATION OF FACILITIES OCTOBER 2786 080.68373 (12,698) RELOCATE FACILITIES. INSTALL 600 FEET OF 6-INCH POLY AND ABANDON 1,342 FEET OF 6 INCH POLY AND 221 FEET OF 6 INCH COATED STEEL WITHIN THE ROW OF MUMFORD ROAD WITHIN THE CITY OF BRYAN, BRAZOS COUNTY DUE TO APT PROJECT. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES AUGUST 2787 080.68374 49,401 INSTALL 2200 FEET OF 4 INCH POLY AND ABANDON 1050 FEET OF 6 INCH CAST IRON, 500 FEET OF 4 INCH CAST IRON, 635 FEET OF 4 INCH STEEL ALONG W. HAMMOND STREET IN FORT WORTH TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2788 080.68375 19,102 INSTALL 2200 FEET OF 4 INCH POLY AND ABANDON 1050 FEET OF 6 INCH CAST IRON AND 500 FEET OF 4 INCH CAST IRON AND 635 FEET OF 4 INCH STEEL ALONG HAMMOND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2789 080.68385 60,020 INSTALL 1270 FEET OF 2 INCH POLY AND 690 FEET OF 4 INCH POLY AND ABANDON 1270 FEET OF 4 INCH CAST IRON, 340 FEET OF 6 INCH CAST IRON, AND 350 FEET OF 8 INCH CAST IRON ALONG GLASGOW DRIVE AND MARTINIQUE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER MTX Additions Page 88 of 178 307 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2790 080.68386 34,037 INSTALL 2035 FEET OF 2 INCH IP POLY AND ABANDON 2035 FEET OF 4 INCH CAST IRON ALONG HOWARD AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2791 080.68393 80,466 INSTALL 2105 FEET OF 4 INCH POLY AND ABANDON 2090 FEET OF 4 INCH CAST IRON, 164 FEET OF 4 INCH POLY, AND 96 FEET OF STEEL ALONG WEBER STREET AND LULU STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2792 080.68395 54,272 INSTALL 1221 FEET OF 4 INCH POLY ABANDON 1042 FEET OF 4 INCH CAST IRON, 178 FEET OF 4 INCH POLY. ALONG DEWEY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2793 080.68396 65,751 INSTALL 4000 FEET OF 4 INCH OF POLY AND ABANDON 1515 FEET OF 4 INCH CAST IRON, 560 FEET OF 4 INCH STEEL ALONG W. BOYCE IN FORT WORTH TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2794 080.68398 60,247 INSTALL 3642 FEET OF 4 INCH STEEL AND ABANDON 1075 FEET OF 4 INCH CAST IRON, 1500 FEET OF 6 INCH STEEL, 2567 FEET OF 4 INCH STEEL, 170 FEET OF 4 INCH POLY ALONG AVENUE D IN FORT WORTH, TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2795 080.68399 35,183 INSTALL 2103 FEET OF 4 INCH POLY AND ABANDON 1447 FEET OF 4 INCH STEEL, 463 FEET OF 6 INCH STEEL, AND 146 FEET OF 4 INCH CAST IRON ALONG N COMMERCE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2796 080.68400 32,425 INSTALL 1805 FEET OF 2 INCH POLY AND ABANDON 630 FEET OF 4 INCH CAST IRON, 735 FEET OF 6 INCH CAST IRON, 385 FEET OF 2 INCH STEEL AND 55 FEET OF 3 INCH STEEL ALONG NORTH RAVINIA STRET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2797 080.68403 34,268 INSTALL 2010 FEET OF 2 INCH POLY AND ABANDON 945 FEET OF 4 INCH CAST IRON AND 1495 FEET OF 4 INCH STEEL. ALONG MERRIFIELD AVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2798 080.68404 46,746 INSTALL 1920 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 4 INCH CAST IRON AND 640 FEET OF 2 INCH STEEL AND 735 FEET OF 2 INCH STEEL AND 25 FEET OF 4 INCH STEEL AND 10 FEET OF 8 INCH STEEL ALONG STRONG STREET AND WINSTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2799 080.68407 20,345 RELOCATE FACILITIES. INSTALL 880 FEET OF 4 INCH POLY ALONG AVENUE H AND ABANDON 525 FEET OF 4 INCH AND 490 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF GARLAND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER 2800 080.68408 1,696 ABANDON DISTRICT REGULATOR STATION #17 IN GATESVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE SYSTEM INTEGRITY OCTOBER 2801 080.68411 74,200 INSTALL 2300 FEET OF 2 INCH POLY AND ABANDON 2300 FEET OF 4 INCH CAST IRON ALONG PRESIDIA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2802 080.68416 77,784 INSTALL 1500 FEET OF 4 INCH POLY AND 660 FEET OF 2 INCH POLY AND ABANDON 1230 FEET OF 6 INCH CAST IRON, 560 FEET OF 4 INCH POLY, 300 FEET OF 4 INCH CAST IRON, AND 135 FEET OF 4 INCH STEEL ALONG W UNIVERSITY BLVD AND WATEKA DRIVE N ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2803 080.68418 1,901 REPLACE DISTRICT REGULATOR STATION #03 IN MART AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY OCTOBER 2804 080.68421 53,638 INSTALL 1470 FEET OF 2 INCH POLY AND 230 FEET OF 4 INCH POLY AND ABANDON 1630 FEET OF 4 INCH CAST IRON, 1470 FEET OF 6 INCH CAST IRON, 650 FEET OF 8 INCH CAST IRON AND 175 FEET OF 2 INCH STEEL ALONG BRYAN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2805 080.68422 172,641 INSTALL 2350 FEET OF 2 INCH POLY AND 560 FEET OF 6 INCH POLY AND ABANDON 2050 FEET OF 6 INCH CAST IRON, 145 FEET OF 4 INCH POLY AND 15 FEET OF 6 INCH POLY ALONG ORAM STREET AND PROSPECT AVENUE&NBSP; IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2806 080.68423 11,827 INSTALL 205 FEET OF 2 INCH POLY AND 1395 FEET OF 4 INCH POLY ALONG GLENCOE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2807 080.68427 3,204 ABANDON 400 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEONA SYSTEM INTEGRITY OCTOBER 2808 080.68429 197,580 RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH AND 1000 FEET OF 6 INCH POLY AND 800 FEET OF 16 INCH STEEL ALONG CLEBURNE CROWLEY RD TO CAPPS ST AND ABANDON 300 FEET OF 4 INCH POLY AND 250 FEET OF 6 INCH STEEL AND 120 FEET TO ACCOMMODATE CITY OF CLEBURNE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES DECEMBER 2809 080.68435 9,880 INSTALL DISTRICT REGULATOR STATION #18 IN GATESVILLE AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE SYSTEM INTEGRITY OCTOBER 2810 080.68438 8,730 INSTALL 755 FEET OF 2 INCH POLY AND ABANDON 318 FEET OF 2 INCH POLY AND 1598 FEET OF 2 INCH STEEL AND DRS04 ALONG MILL AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY OCTOBER 2811 080.68439 11,373 INSTALL REGULATOR STATION #05 ALONG CHURCH STREET AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MOODY SYSTEM INTEGRITY OCTOBER 2812 080.68447 21,122 RELOCATE FACILITIES. INSTALL 752 FEET OF 4 INCH POLY AND ABANDON 103 FEET OF 2 INCH POLY AND 752 FEET OF 4 INCH STEEL AND 320 FEET OF 6 INCH STEEL ALONG EAST FIRST STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2813 080.68448 21,319 RELOCATE FACILITIES. INSTALL 19 FEET OF 2 INCH POLY AND 15 FEET OF 4 INCH POLY AND 1120 FEET OF 6 INCH POLY AND ABANDON 10 FEET OF 2 INCH POLY AND 11 FEET OF 4 INCH POLY AND 1106 FEET OF 6 INCH STEEL ALONG CONWAY STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2814 080.68453 23 ABANDON 2004 FEET OF 2 INCH STEEL AND 313 FEET OF 2 INCH POLY ALONG MARSHALL AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER 2815 080.68454 6,113 RELOCATE FACILITIES. INSTALL 301 FEET OF 4 INCH POLY AND ABANDON 285 FEET OF 4 INCH POLY ALONG EAST MAIN STREET TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES OCTOBER 2816 080.68465 14,635 INSTALL 38 FEET OF 2 INCH POLY AND 14 FEET OF 4 INCH POLY AND 820 FEET OF 6 INCH POLY AND ABANDON 8 FEET OF 2 INCH STEEL AND 22 FEET OF 2 INCH POLY AND 557 FEET OF 4 INCH STEEL AND 90 FEET OF 4 INCH POLY AND 155 FEET OF 6 INCH STEEL AND 40 FEET OF 6 INCH POLY ALONG BRADFORD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 2817 080.68468 10,711 RELOCATE FACILITIES. INSTALL 770 FEET OF 4 INCH POLY AND ABANDON 742 FEET OF 4 INCH STEEL AND 500 FEET OF 4 INCH POLY ALONG CEDAR AND 3RD STREET TO ACCOMMODATE CITY OF HEARNE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE RELOCATION OF FACILITIES OCTOBER 2818 080.68474 43,242 INSTALL 1590 FEET OF 2 INCH POLY AND ABANDON 2079 FEET OF 4 INCH STEEL AND 428 FEET OF 4 INCH POLY ALONG DUVAL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2819 080.68477 20,252 INSTALL 1425 FEET OF 2 INCH POLY AND ABANDON 488 FEET OF 6 INCH STEEL, 1412 FEET OF 4 INCH STEEL, AND 390 FEET OF 2 INCH STEEL AND 200 FEET OF 4 INCH POLY AND 100 FEET OF 2 INCH POLY ALONG ROBERTS STREET&NBSP; IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER MTX Additions Page 89 of 178 308 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2820 080.68482 3,925 INSTALL 1100 FEET OF 4 INCH POLY AND ABANDON 1100 FEET OF 3 INCH STEEL ALONG COMMERCE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY OCTOBER 2821 080.68485 26,052 INSTALL 1257 FEET OF 2 INCH POLY AND ABANDON 1257 FEET OF 2 INCH POLY ALONG WILLIAMS AND GOLDEN OAKS TO ACCOMMODATE THE CITY OF GEORGETOWN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER 2822 080.68486 1,790 INSTALL 7300 FEET OF 4 INCH AND 3500 FEET OF 2 INCH POLY ALONG THE STREETS OF TANGLEWOOD SUBDIVISION. RESIDENTIAL WOODWAY GROWTH MARCH 2823 080.68487 60,403 RELOCATE FACILITIES. INSTALL1099 FEET OF 12 INCH POLY, 140 FEET OF 4 INCH POLY AND 105 FEET OF 2 INCH POLY ALONG FAIN DRIVE AND WHEELER STREET AND ABANDON 1110 FEET OF 12 INCH STEEL, 60 FEET OF 4 INCH STEEL, AND 110 FEET OF 2 INCH POLY TO ACCOMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2824 080.68499 37,613 RELOCATE FACILITIES. INSTALL 1025 FEET OF 2 INCH POLY AND 179 FEET OF 4 INCH POLY AND ABANDON 1104 FEET OF 3 INCH STEEL AND 156 FEET OF 4 INCH POLY ALONG N 40TH STREET TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 2825 080.68501 33,146 INSTALL 655 FETT OF 4 INCH POLY AND 600 FEET OF 2 INCH POLY AND ABANDON 655 FEET OF 2 INCH STEEL AND 970 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM SYSTEM INTEGRITY OCTOBER 2826 080.68503 9,560 INSTALL 750 FEET OF 2 INCH POLY ALONG CONCH STREET AND ABANDON 750 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM SYSTEM INTEGRITY OCTOBER 2827 080.68510 51,985 RELOCATE FACILITIES. INSTALL 69 FEET OF 2 INCH POLY AND 410 FEET OF 4 INCH POLY AND 445 FEET OF 8 INCH POLY AND ABANDON 428 FEET OF 4 INCH STEEL AND 69 FEET OF 4 INCH POLY AND 452 FEET OF 6 INCH STEEL ALONG COLCORD AVENUE TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 2828 080.68513 95 ABANDON 458 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER 2829 080.68514 35,270 INSTALL 1705 FEET OF 4 INCH POLY AND ABANDON 751 FEET OF 4 INCH, 403 FEET OF 2 INCH STEEL, 350 FEET OF 2 INCH, 180 FEET OF 4 INCH POLY AND 308 FEET OF 4 INCH CAST IRON ALONG NE 32ND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2830 080.68515 38,871 INSTALL 1600 FEET OF 4 INCH POLY AND ABANDON 566 FEET OF 4 INCH CAST IRON AND 890 FEET OF 4 INCH CAST IRON AND 565 FEET OF 4 INCH POLY ALONG AVENUE I IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2831 080.68516 30,998 INSTALL 1600 FEET OF 4 INCH POLY AND ABANDON 500 FEET OF 6 INCH CAST IRON, 850 FEET OF 4 INCH STEEL ALONG AVENUE K IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2832 080.68517 56,294 INSTALL 1817 FEET OF 4 INCH POLY AND ABANDON 667 FEET OF 4 INCH CAST IRON AND 418 FEET OF 2 INCH POLY AND 266 FEET OF 4 INCH POLY AND 11 FEET OF 4 INCH STEEL ALONG SHCWARTZ AVENUE AND OSCAR AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2833 080.68518 26,232 INSTALL 1535 FEET OF 4 INCH POLY AND ABANDON 503 FEET OF 4 INCH CAST IRON AND 958 FEET OF 4 INCH POLY ALONG OSCAR AVENUE IN ACCORDANCE WITH TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2834 080.68519 69,385 INSTALL 5600 FEET OF 4 INCH POLY AND ABANDON 1225 FEET OF 6 INCH CAST IRON AND 615 FEET OF 3 INCH STEEL ALONG ROSEMONT AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2835 080.68520 5,507 RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH POLY ALONG LAKEVIEW RV PARK AND ABANDON 3910 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2836 080.68521 39,236 INSTALL 1900 FEET OF 4 INCH POLY AND ABANDON 1225 FEET OF 6 INCH CAST IRON AND 615 FEET OF 3 INCH STEEL ALONG ROSEMONT AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2837 080.68522 27,366 INSTALL 1180 FEET OF 4 INCH POLY AND ABANDON 556 FEET OF 6 INCH CAST IRON, 450 FEET OF 4 INCH STEEL, 192 FEET OF 4 INCH CAST IRON ALONG CURRIE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2838 080.68523 31,744 INSTALL 1900 FEET OF 4 INCH POLY AND ABANDON 1800 FEET OF 4 INCH CAST IRON ALONG WILLING AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2839 080.68524 25,433 INSTALL 1175 FEET OF 4 INCH POLY AND ABANDON 1180 FEET OF 6 INCH CAST IRON ALONG W. GAMBRELL STREET IN FORT WORTH TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2840 080.68529 24,252 RELOCATE FACILITIES. INSTALL 1434 FEET OF 6 INCH POLY ALONG LIMOUSINE PARKWAY AND ABANDON 1354 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES OCTOBER 2841 080.68534 58,868 INSTALL 1920 FEET OF 2 INCH POLY AND ABANDON 1820 FEET OF 8 INCH CAST IRON ALONG MARQUETTE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2842 080.68536 81,124 INSTALL 2695 FEET OF 2 INCH POLY AND ABANDON 945 FEET OF 4 INCH CAST IRON, 765 FEET OF 6 INCH CAST IRON, 1505 FEET OF 8 INCH CAST IRON, 880 FEET OF 4 INCH POLY AND 20 FEET OF 8 INCH POLY ALONG CENTENARY AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2843 080.68541 50,693 INSTALL 458 FEET OF 6 INCH POLY AND ABANDON 425 FEET OF 6 INCH POLY ALONG SH360 AND MAYFIELD ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 2844 080.68546 6,635 INSTALL ANODES AND ABANDON ANODES ALONG GREEN STREET IN LONGVIEW, TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER 2845 080.68561 566 RELOCATE FACILITIES. ABANDON 285 FEET OF 6 INCH POLY ALONG KELLER HASLET ROAD IN FORT WORTH, TX TO ACCOMODATE THE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2846 080.68562 3,338 INSTALL 304 FEET OF 2 INCH POLY ALONG HWY 80 AND FM 2208 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER 2847 080.68564 39,690 RELOCATE FACILITIES. INSTALL 620 FEET OF 6 INCH, 860 FEET OF 4 INCH AND 90 FEET OF 2 INCH POLY ALONG UNIVERSITY PARKS & WEBSTER AVE AND ABANDON 291 FEET OF 6 INCH STEEL AND 768 FEET OF 6 INCH POLY AND 328 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF WACO STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 2848 080.68566 14,986 RELOCATE FACILITIES. INSTALL 148 FEET OF 4 INCH POLY AND ABANDON 140 FEET OF 4 INCH POLY ALONG SUNDOWN BOULEVARD AND TEASLEY LANE TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 2849 080.68571 1,845 REPLACE DISTRICT REGULATOR STATION #04 IN MART AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY OCTOBER 2850 080.68574 2,082,116 INSTALL 4500 FEET OF 16 INCH STEEL ALONG PIPELINE ROAD AND ABANDON 4500 FEET OF 16 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY DECEMBER 2851 080.68576 2,861,959 RELOCATE FACILITIES. INSTALL 5000 FEET OF 16 INCH STEEL ALONG PIPELINE ROAD AND ABANDON 5000 FEET OF 16 INCH STEEL TO ACCOMMODATE CITY OF EULESS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS RELOCATION OF FACILITIES OCTOBER MTX Additions Page 90 of 178 309 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2852 080.68582 53,758 INSTALL 1280 FEET OF 2 INCH POLY AND ABANDON 1280 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2853 080.68583 37,998 INSTALL 1400 FEET OF 2 INCH POLY AND ABANDON 1045 FEET OF 2 INCH STEEL ALONG SOUTH OF NORTHVIEW FROM MIDWAY EAST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2854 080.68586 42,921 INSTALL 1820 FEET OF 2 INCH POLY AND ABANDON 1325 FEET OF 2 INCH STEEL ALONG THE ALLEY NORTH OF CEDARBRUSH FROM COX LN EAST IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2855 080.68597 828 INSTALL 2030 FEET OF 6 INCH POLY AND 4200 FEET 4 INCH POLY ALONG 161 PARK IN DFW AIRPORT IRVING TX. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL IRVING GROWTH MARCH 2856 080.68609 711 ABANDON 211 FEET OF 3 INCH STEEL AND 991 FEET OF 4 INCH STEEL AND 41 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALVERT SYSTEM INTEGRITY OCTOBER 2857 080.68619 41,461 INSTALL 2290 FEET OF 2 INCH POLY AND ABANDON 990 FEET OF 4 INCH CAST IRON, 940 FEET OF 4 INCH POLY, 15 FEET OF 6 INCH POLY, 10 FEET OF 8 INCH POLY, 330 FEET OF 2 INCH STEEL AND 5 FEET OF 2 INCH STEEL ALONG SONORA AVENUE AND OPAL AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2858 080.68622 64,164 INSTALL 1520 FEET OF 2 INCH POLY AND 1310 FEET OF 4 INCH POLY AND ABANDON 415 FEET OF 4 INCH CAST IRON, 95 FEET OF 4 INCH POLY AND 1055 FEET OF 4 INCH STEEL ALONG IOWA AVENUE AND GEORGIA AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2859 080.68623 39,863 INSTALL 1640 FEET OF 4 INCH POLY AND ABANDON 1640 FEET OF 8 INCH CAST IRON ALONG CARPENTER AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2860 080.68628 80,193 INSTALL 600 FEET OF 10 INCH STEEL AND ABANDON 486 FEET OF 10 INCH STEEL ALONG NEW YORK AVENUE AND BARDIN ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 2861 080.68635 27,797 INSTALL DISTRICT REGULATOR STATION 02 ALONG EAST ELM STREET AND SOUTH MAIN STREET AND ABANDON DISTRICT REGULATOR STATION 02 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST SYSTEM INTEGRITY OCTOBER 2862 080.68646 36,444 INSTALL 1465 FEET OF 2 INCH POLY ALONG ROYAL CHAPEL DRIVE AND ABANDON 1465 FEET OF 2 INCH STEEL IN ACCORDANC WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2863 080.68650 106,980 INSTALL 2400 FEET OF 2 INCH POLY ALONG WILDFLOWER DRIVE AND ABANDON 2400 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2864 080.68652 17,465 INSTALL 1075 FEET OF 6 INCH POLY AND ABANDON 5 FEET OF 4 INCH CAST IRON, 1040 FEET OF 8 INCH CAST IRON, 240 FEET OF 3 INCH STEEL AND 15 FEET OF 4 INCH STEEL ALONG S HASKELL AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2865 080.68655 33,619 INSTALL 1245 FEET OF 4 INCH POLY AND ABANDON 1245 FEET OF 3 INCH STEEL ALONG GOODYEAR DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2866 080.68656 63,708 INSTALL 1750 FEET OF 2 INCH AND 300 FEET OF 4 INCH POLY ALONG PONDER DR. AND ABANDON 1750 FEET OF 2 INCH AND 300 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2867 080.68657 81,570 INSTALL 1415 FEET OF 2 INCH POLY AND 845 FEET OF 4 INCH POLY AND ABANDON 1270 FEET OF 4 INCH CAST IRON AND 795 FEET OF 6 INCH CAST IRON IN ACORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2868 080.68659 33,974 INSTALL 1550 FEET OF 2 INCH POLY AND 545 FEET OF 4 INCH POLY AND ABANDON 1280 FEET OF 2 INCH CAST IRON, 190 FEET OF 4 INCH CAST IRON, 15 FEET OF 2 INCH POLY, 105 FEET OF 4 INCH POLY, 15 FEET OF 6 INCH POLY, 10 FEET OF 8 INCH POLY, 275 FEET OF 2 INCH STEEL AND 15 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2869 080.68682 48,179 INSTALL 1015 FEET OF 2 INCH, 350 FEET OF 4 INCH AND 180 FEET OF 6 INCH POLY ALONG WARD AND ABANDON 1288 FEET OF 4 INCH AND 270 FEET OF 2 INCH STEEL AND 116 FEET OF 6 INCH STEEL AND 656 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY OCTOBER 2870 080.68694 43,199 INSTALL 1900 FEET OF 2 INCH POLY AND ABANDON 1700 FEET OF 4 INCH CAST IRON ALONG TOLUCA ABENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2871 080.68696 12,656 RELOCATE FACILITIES. INSTALL 1550 FEET OF 4 INCH POLY ALONG DAVID DR AND ABANDON 5 FEET OF 4 INCH AND 1010 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF BEDFORD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEDFORD RELOCATION OF FACILITIES OCTOBER 2872 080.68698 24,721 RELOCATE FACILITIES. INSTALL 1400 FEET OF 4 INCH AND 80 FEET OF 2 INCH POLY ALONG SUFFOLK DRIVE AND ABANDON 1400 FEET OF 4 INCH AND 80 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2873 080.68704 37,234 INSTALL 700 FEET OF 2 INCH POLY AND 740 FEET OF 4 INCH POLY AND ABANDON 5 FEET OF 3 INCH CAST IRON, 1670 FEET OF 4 INCH CAST IRON, 80 FEET OF 6 INCH CAST IRON, 825 FEET OF 8 INCH CAST IRON AND 155 FEET OF 8 INCH CAST IRON ALONG MCKINNEY AVENUE AND TRAVIS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2874 080.68705 83,836 INSTALL 625 FEET OF 2 INCH AND 1120 FEET OF 4 INCH POLY AND ABANDON 1205 FEET OF 4 INCH, 350 FEET OF 6 INCH CAST IRON, 75 FEET OF 4 INCH POLY AND 45 FEET OF 4 INH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2875 080.68709 9,101 INSTALL 1,050 FEET OF 4 INCH POLY ALONG BOMBER DRIVE TO SERVE BRYAN SUPERPARK DUE TO CUSTOMER GROWTH. DEVELOPER INSTALLED FACILITY COMMERCIAL OR INDUSTRIAL BRYAN GROWTH JUNE 2876 080.68711 37,429 INSTALL 1820 FEET OF 2 INCH POLY ALONG HARLANDALE AVENUE AND S EWING AVENUE AND ABANDON 35 FEET OF 4 INCH CAST IRON, 20 FEET OF 2 INCH POLY, 1240 FEET OF 2 INCH STEEL AND 500 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2877 080.68712 3,697 RELOCATE FACILITIES. INSTALL 126 FEET OF 2 INCH POLY AND ABANDON 28 FEET OF 2 INCH STEEL AND 63 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES OCTOBER 2878 080.68713 69,746 INSTALL 3435 FEET OF 2 INCH POLY AND ABANDON 1570 FEET OF 4 INCH AND 1600 FEET OF 6 INCH CAST IRON AND 280 FEET OF 2 INCH STEEL ALONG VERMONT AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2879 080.68714 33,081 INSTALL 1860 FEET OF 2 INCH POLY AND ABANDON 1285 FEET OF 4 INCH CAST IRON AND 580 FEET OF 4 INCH POLY ALONG VERNON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2880 080.68717 12,463 RELOCATE FACILITIES. INSTALL 285 FEET OF 6 INCH POLY ALONG MCLEROY BLVD AND ABANDON 285 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF SAGINAW IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW RELOCATION OF FACILITIES OCTOBER 2881 080.68724 3,866 RELOCATE FACILITIES. INSTALL 15 FEET OF 2 INCH POLY AND 70 FEET OF 4 INCH POLY AND ABANDON 12 FEET OF 2 INCH POLY AND 22 FEET OF 3 INCH STEEL AND 44 FEET OF 3 INCH POLY ALONG COTTAGE STREET TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES OCTOBER 2882 080.68727 (133,854) INSTALL 5000 FEET OF 6 INCH POLY ALONG VILLA MARIA ROAD AND DISTRICT REGULATOR STATION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS BRYAN GROWTH AUGUST 2883 080.68732 15,847 INSTALL 680 FEET OF 4 INCH POLY AND ABANDON 10 FEET OF 2 INCH AND 173 FEET OF 2 INCH POLY 180 FEET OF 3 INCH AND 309 FEET OF 2 INCH STEEL ALONG N. 13TH AND TREADAWAY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER MTX Additions Page 91 of 178 310 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2884 080.68733 7,097 INSTALL 423 FEET OF 4 INCH POLY AND ABANDON 330 FEET OF 6 INCH STEEL AND 55 FEET OF 6 INCH POLY ALONG 8TH AND 9TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2885 080.68746 1,762 INSTALL 8740 FEET OF 2 INCH AND 2700 FEET OF 4 INCH POLY ALONG THE STREETS OF IRON HORSE VILLAGE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MESQUITE GROWTH APRIL 2886 080.68747 20,698 INSTALL 844 FEET OF 2 INCH POLY ALONG PECK STREET AND ABANDON 4219 FEET OF 4 INCH AND 489 FEET OF 2 INCH STEEL AND 103 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER 2887 080.68748 1,716 ABANDON 581 FEET OF 4 INCH STEEL AND 230 FEET OF 4 INCH POLY ALONG MARSHALL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER 2888 080.68749 52,796 INSTALL 1480 FEET OF 4 INCH AND 70 FEET OF 2 INCH POLY AND ABANDON 1720 FEET OF 4 INCH STEEL AND 3195 FEET OF 2 INCH STEEL AND 82 FEET OF 4 INCH POLY, 701 FEET OF 2 INCH POLY AND 55 FEET OF 1.25 INCH POLY ALONG PRINCETON AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2889 080.68750 10,411 INSTALL 860 FEET OF 2 INCH POLY AND ABANDON 1141 FEET OF 2 INCH STEEL AND 297 FEET OF 2 INCH POLY ALONG WICHITA STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2890 080.68751 57,243 INSTALL 1800 FEET OF 4 INCH POLY ALONG INDIAN TRAIL AND ABANDON 1800 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2891 080.68759 25,011 INSTALL 860 IF 4 INCH AAND 400 FEET OF 2 INCH POLY AND ABANDON 261 FEET OF 2 INCH STEEL AND 748 FEET OF 4 INCH STEEL ALONG 2ND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM SYSTEM INTEGRITY OCTOBER 2892 080.68764 27,548 INSTALL 120 FEET OF 8 INCH POLY AND ABANDON 675 FEET OF 6 INCH STEEL ALONG BROWN TRAIL IN HURST IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY OCTOBER 2893 080.68766 35,500 INSTALL 2324 FEET OF 4 INCH POLY AND ABANDON 885 FEET OF 2 INCH POLY, 775 FEET OF 4 INCH CAST IRON, 640 FEET OF 2 INCH STEEL, 398 FEET OF 3 INCH STEEL, 302 FEET OF 6 INCH POLY AND 128 FEET OF 6 INCH STEEL ALONG 29TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2894 080.68792 46,689 INSTALL 2100 FEET OF 2 INCH POLY ALONG CHAPEL DOWNS DRIVE AND ABANDON 1900 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2895 080.68793 51,971 INSTALL 1900 FEET OF 4 INCH POLY ALONG CHAPEL DOWNS DRIVE & TIMBERVIEW ROAD AND ABANDON 1900 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2896 080.68794 88,182 INSTALL 255 FEET OF 2 INCH POLY AND 1750 FEET OF 4 INCH POLY AND ABANDON 225 FEET OF 2 INCH STEEL AND 1810 FEET OF 3 INCH STEEL ALONG TIMBERVIEW ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2897 080.68798 21,036 INSTALL 725 FEET OF 4 INCH POLY AND ABANDON 384 FEET OF 4 INCH STEEL, 336 FEET OF 4 INCH CAST IRON, 57 FEET OF 4 INCH POLY ALONG OSCAR AVENUE AND HUTCHINSON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2898 080.68799 31,139 ABANDON 565 FEET OF 4 INCH STEEL AND 445 FEET OF 4 INCH CAST IRON AND 160 FEET OF 6 INCH POLY ALONG CLINTON STEET AND HOUSTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2899 080.68800 25,622 INSTALL 1365 FEET OF 4 INCH POLY AND ABANDON 1365 FEET OF 4 INCH CAST IRON ALONG WETWOOD AVENUE AND N BAILEY AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2900 080.68803 31,744 INSTALL 1093 FEET OF 4 INCH POLY AND ABANDON 451 FEET OF 4 INCH CAST IRON AND 330 FEET OF 4 INCH STEE ALONG SCHWARTZ AVENUE. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2901 080.68804 54,075 INSTALL 2900 FEET OF 4 INCH POLY AND ABANDON 630 FEET OF 4 INCH CAST IRON, 1090 FEET OF 4 INCH STEEL, 705 FEET OF 4 INCH POLY ALONG ANTHONY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2902 080.68807 8,899 INSTALL 365 FEET OF 6 INCH POLY AND ABANDON 376 FEET OF 6 INCH STEEL ALONG BELTLINE ROAD AND PIONEER DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER 2903 080.68809 9,249 RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH POLY ALONG W. CHURCH STREET AND ABANDON 300 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF CLARKSVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLARKSVILLE RELOCATION OF FACILITIES OCTOBER 2904 080.68810 24,637 INSTALL 1053 FEET OF 2 INCH POLY AND ABANDON 1185 FEET OF 2 INCH STEEL AND 15 FEET OF 2 INCH POLY ALONG PULLEN AND E 2ND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY OCTOBER 2905 080.68812 24,819 RELOCATE FACILITIES. INSTALL 1,152 FEET OF 2 INCH POLY, 177 FEET OF 4 INCH POLY, 1,319 FEET OF 6 INCH POLY ALONG PATTERSON LANE AND ABANDON 56 FEET OF 2 INCH POLY, 208 FEET OF 3 INCH POLY, 267 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF COLLEYVILLE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE RELOCATION OF FACILITIES OCTOBER 2906 080.68813 41,244 INSTALL 720 FEET OF 6 INCH POLY AND ABANDON 280 FEET OF 3 INCH STEEL AND 1276 FEET OF 4 INCH STEEL AND 549 FEET OF 4 INCH POLY ALONG N 1ST AND GARFIELD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY OCTOBER 2907 080.68814 10,977 RELOCATE FACILITIES. INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 2 INCH STEEL ALONG LEE STREET TO ACCOMMODATE THE CITY OF EVERMAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN RELOCATION OF FACILITIES OCTOBER 2908 080.68816 4,878 INSTALL 460 FEET OF 2 INCH POLY AND ABANDON 548 FEET OF 2 INCH STEEL AND 259 FEET OF 2 INCH POLY ALONG 4TH AND MAPLE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GUNTER SYSTEM INTEGRITY OCTOBER 2909 080.68821 41,166 INSTALL 975 FEET OF 10 INCH STEEL AND ABANDON 975 FEET OF 10 INCH STEEL ALONG LONG BRANCH CIRCLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BARDWELL SYSTEM INTEGRITY OCTOBER 2910 080.68823 66,550 INSTALL 2450 FEET OF 4 INCH POLY AND ABANDON 2430 FEET OF 6 INCH CAST IRON, 430 FEET OF 6 INCH POLY ALONG HENDERSON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2911 080.68828 32,814 INSTALL 1451 FEET OF 4 INCH POLY AND ABANDON 1577 FEET OF 4 INCH CAST IRON ALONG BAILEY AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2912 080.68830 25,320 INSTALL 1475 FEET OF 2 INCH POLY AND ABANDON 1425 FEET OF 6 INCH CAST IRON AND 360 FEET OF 6 INCH POLY ALONG FOGG STREET IN ACCORDANCE WITH TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2913 080.68831 46,103 INSTALL 1542 FEET OF 4 INCH POLY AND ABANDON 1200 FEET OF 4 INCH CAST IRON, 342 FEET OF 4 INCH POLY ALONG DEWEY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2914 080.68833 31,230 INSTALL 1030 FEET OF 4 INCH POLY AND ABANDON 771 FEET OF 4 INCH AND 264 FEET OF 4 INCH CAST IRON ALONG DEEN ED ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2915 080.68848 2,746 RELOCATE FACILITIES. INSTALL 20 FEET OF 2 INCH POLY AND ABANDON 20 FEET OF 2 INCH POLY ALONG MINGO STREET TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2916 080.68863 8,747 INSTALL 1020 FEET OF 2 INCH POLY AND ABANDON 550 FEET 2 INCH STEEL AND 560 FEET OF 2 INCH POLY ALONG ARTHUR STREET AND EAST 1ST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY OCTOBER MTX Additions Page 92 of 178 311 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2917 080.68868 38,372 INSTALL 1695 FEET OF 2 INCH POLY AND ABANDON 1160 FEET OF 3 INCH STEEL, 560 FEET OF 2 INCH STEEL AND 148 FEET OF 1.25 INCH STEEL AND 895 FEET OF 2 INCH POLY AND 20 FEET OF 1.25 INCH POLY ALONG NORTH PENN STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY OCTOBER 2918 080.68869 12,187 INSTALL 910 FEET OF 2 INCH POLY ALONG NORTH TEXOWA STREET AND ABANDON 761 FEET OF 3 INCH STEEL AND 137 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY OCTOBER 2919 080.68871 8,801 RELOCATE FACILITIES. INSTALL 785 FEET OF 4 INCH POLY ALONG ROCKHILL ROAD AND ABANDON 730 FEET OF 3 INCH IP STEEL, 30 FEET OF 3 INCH IP POLY AND 25 FEET OF 4 INCH IP POLY TO ACCOMMODATE THE CITY OF MCKINNEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES OCTOBER 2920 080.68873 45,367 RELOCATE FACILITIES. INSTALL 920 FEET OF 6 INCH, 200 FEET OF 4 INCH POLY ALONG BOSQUE AND ABANDON 920 FEET OF 6 INCH, 10 FEET OF 8 INCH AND 10 FEET OF 4 INCH STEEL AND 65 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF WACO STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 2921 080.68874 1,977 INSTALL DISTRICT REGULATOR STATION IN BRYAN ALONG NUCHES LANE AND SCOTT STREET AND ABANDON DISTRICT REGULATOR STATION ML-21 IN ACCORDANCE WITH THE RAILRAOD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 2922 080.68877 10,337 RELOCATE FACILITIES. INSTALL 173 FEET OF 2 INCH POLY AND 84 FEET OF 4 INCH POLY AND ABANDON 4 FEET OF 1.25 INCH POLY AND 80 FEET OF 2 INCH STEEL AND 72 FEET OF 2 INCH POLY AND 69 FEET OF 3 INCH STEEL AND 80 FEET OF 4 INCH STEEL ALONG AVE M TO ACCOMMODATE CITY OF TEMPLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE RELOCATION OF FACILITIES OCTOBER 2923 080.68890 20,967 INSTALL 4200 FEET OF 6 INCH POLY ALONG CLEM ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROCKWALL GROWTH JUNE 2924 080.68891 643 INSTALL 2475 FEET OF 6 INCH AND 2481 FEET OF 4 INCH POLY ALONG THE STREETS OF NORTHLINE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH APRIL 2925 080.68918 33,992 INSTALL 1,483 FEET OF 8 INCH AND 487 FEET OF 6 INCH POLY ALONG THE STREETS OF NORTHLINE IN LEANDER. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LEANDER GROWTH SEPTEMBER 2926 080.68919 13,086 INSTALL 1800 FEET OF 4 INCH POLY AND ABANDON 3000 FEET OF 3 INCH STEEL ALONG COMMERCE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY OCTOBER 2927 080.68923 12,177 INSTALL 911 FEET OF 2 INCH POLY AND ABANDON 119 FEET OF 2 INCH STEEL AND 134 FEET OF 3 INCH STEEL AND 64 FEET OF 3 INCH POLY AND 527 FEET OF 4 INCH STEEL ALONG HUGHES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY OCTOBER 2928 080.68924 43,739 INSTALL 500 FEET OF 4 INCH POLY AND 1000 FEET OF 2 INCH POLY AND ABANDON 615 FEET OF 2 INCH IP AND 875 FEET OF 3 INCH STEEL ALONG ALTA VIST DRIVE IN ACCORDANCE WITH RAILROAD OCMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 2929 080.68927 120,357 RELOCATE FACILITIES. INSTALL 615 FEET OF 2 INCH POLY, 834 FEET OF 4 INCH POLY, 3050 FEET OF 6 INCH POLY ALONG TXDOT SH205 TO ACCOMMODATE CITY OF TERRELL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL RELOCATION OF FACILITIES OCTOBER 2930 080.68931 7,000 RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY ALONG HWY 180 AND ABANDON 500 FEET OF 3 INCH POLY TO ACCOMMODATE TXDOT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY RELOCATION OF FACILITIES OCTOBER 2931 080.68954 25,261 INSTALL 40 FEET OF 8 INCH, 80 FEET OF 12 INCH AND 40 FEET OF 20 INCH STEEL AND DISTRICT REGULATOR STATION ALONG FORD ROAD AND ABANDON 120 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 2932 080.68956 47,116 INSTALL 1845 FEET OF 2 INCH POLY ALONG CRESTWOOD DR AND ABANDON 1690 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 2933 080.68957 8,574 INSTALL 620 FEET OF 4 INCH POLY ALONG HUACO LANE AND ABANDON 620 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 2934 080.68958 15,971 INSTALL 50 FEET OF 12 INCH POLY, 200 FEET OF 8 INCH POLY, 134 FEET OF 4 INCH POLY AND 20 FEET OF 6 INCH POLY AND ABANDON 39 FEET OF 10 INCH STEEL, 292 FEET OF 8 INCH STEEL AND 155 FEET OF 3 INCH STEEL AND 128 FEET OF 3 INCH POLY ALONG S. 27TH AND SANTA MONICA IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 2935 080.68960 19,943 INSTALL 1200 FEET OF 4 INCH POLY ALONG OLDHAM LANE AND ABANDON 465 FEET OF 4 INCH AND 1058 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 2936 080.68990 16,100 INSTALL 940 FEET OF 6 INCH POLY ALONG MONTECITO AND ABANDON 940 FEET OF 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 2937 080.68991 13,540 INSTALL 825 FEET OF 2 INCH POLY ALONG ARDATH AND ABANDON 882 FEET OF 4 INCH STEEL AND 80 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 2938 080.68996 67,023 INSTALL 4150 FEET OF 4 INCH POLY ALONG ELIZABETH AVENUE AND ABANDON 550 FEET OF 6 CAST IRON, 600 FEET OF 6 INCH STEEL, 900 FEET OF 4 INCH STEEL, 950 FEET OF 6 INCH POLY, 1550 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2939 080.69000 51,678 INSTALL 2200 FEET OF 4 INCH POLY AND ABANDON 1550 FEET OF 4 INCH CAST IRON, 105 FEET OF 4 INCH STEEL ALONG BALDWIN AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2940 080.69006 25,486 INSTALL 1675 FEET OF 4 INCH POLY AND ABANDON 188 FEET OF 4 INCH STEEL, 1120 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2941 080.69008 34,272 INSTALL 1775 OF 4 INCH POLY AND ABANDON 2055 FEET OF 6 INCH CAST IRON ALONG GAMBRELL STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2942 080.69010 3,638 INSTALL 3 LONGSIDE SERVICE LINES AND ABANDON 3 LONGSIDE TO ACCOMMODATE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2943 080.69011 35,955 INSTALL 1930 FEET OF 4 INCH POLY AND ABANDON 1865 FEET OF 4 INCH CAST IRON ALONG 27TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2944 080.69012 26,631 INSTALL 1483 FEET OF 4 INCH POLY AND ABANDON 685 FEET OF 4 INCH CAST IRON, 501 FEET OF 4 INCH POLY, 79 FEET OF 6 INCH POLY ALONG CLIFF STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2945 080.69013 30,128 INSTALL 1650 FEET OF 4 INCH POLY AND ABANDON 1600 FEET OF 6 INCH CAST IRON ALONG GAMBRELL STREET IN ACCORDACNE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2946 080.69014 103,511 INSTALL 2185 FEET OF 2 INCH POLY ALONG WILDER STREET AND ABANDON 1590 FEET OF 4 INCH CAST IRON AND 465 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2947 080.69015 57,985 INSTALL 1540 FEET OF 2 INCH POLY AND 775 FEET OF 4 INCH POLY AND ABANDON 690 FEET OF 4 INCH CAST IRON AND 1570 FEET OF 6 INCH CAST IRON ALONG MARYLAND AVENUE AND MARSALIS AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2948 080.69016 56,854 INSTALL 1695 FEET OF 2 INCH POLY AND ABANDON 1670 FEET OF 6 INCH CAST IRON ALONG TERRACE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2949 080.69024 79,158 INSTALL 2898 FEET OF 2 INCH POLY AND ABANDON 3375 FEET OF 2 INCH STEEL ALONG CALYPSO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER MTX Additions Page 93 of 178 312 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2950 080.69026 101,969 INSTALL 2553 FEET OF 2 INCH POLY AND ABANDON 2451 FEET OF 2 INCH STEEL AND 110 FEET OF 2 INCH POLY ALONG ANGELINA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2951 080.69051 129,425 INSTALL 2650 FEET OF 2 INCH POLY ALONG LEATH AND ABANDON 2650 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2952 080.69052 175,472 INSTALL 200 FEET OF 2 INCH AND 3315 FEET OF 4 INCH POLY ALONG BAYSIDE AND ABANDON 3500 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2953 080.69056 42,058 INSTALL 285 FEET OF 2 INCH AND 2000 FEET OF 4 INCH POLY AND ABANDON 285 FEET OF 4 INCH, 1745 FEET OF 8 INCH CAST IRON AND 255 FEET OF 8 INCH POLY ALONG SAMUELL BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2954 080.69057 43,304 INSTALL 1435 FEET OF 2 INCH POLY AND ABANDON 1415 FEET OF 6 INCH CAST IRON ALONG MCNEIL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2955 080.69061 10,714 RELOCATE FACILITIES. INSTALL 25 POLY SERVICES AND ABANDON 25 POLY SERVICES ALONG KIRKMEADOW LANE TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 2956 080.69068 374 INSTALL 913 FEET OF 4 INCH AND 1,113 FEET OF 2 INCH POLY ALONG THE STREETS OF MEADOW PARK SUBDIVISION. RESIDENTIAL FORT WORTH GROWTH MARCH 2957 080.69077 17,169 RELOCATE FACILITIES. INSTALL 1840 FEET OF 4 INCH POLY ALONG LONGHORN TRAIL AND ABANDON 1840 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF CROWLEY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY RELOCATION OF FACILITIES OCTOBER 2958 080.69089 11,857 INSTALL DISTRICT REGULATOR STATION ALONG THE STREETS OF N MILLER AVENUE AND NE 3RD STREET AND ABANDON DISTRICT REGULATOR STATION 06 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HUBBARD SYSTEM INTEGRITY OCTOBER 2959 080.69101 4,838 RELOCATE FACILITIES. INSTALL 86 FEET OF 4 INCH POLY AND ABANDON 79 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT ALONG OLYMPIC DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES OCTOBER 2960 080.69113 1,264 ABANDON DISTRICT REGULATOR STATION #130 IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2961 080.69116 44,032 RELOCATE FACILITIES. INSTALL 2181 FEET OF 6 INCH POLY ALONG FM 455 AND ABANDON 2131 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF SANGER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 2962 080.69125 8,114 INSTALL DISTRICT REGULATOR STATION 01 ALONG THE MARY STREET AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MORGAN SYSTEM INTEGRITY OCTOBER 2963 080.69138 543 ABANDON 413 FEET OF 2 INCH STEEL AND 250 FEET OF 2 INCH POLY ALONG MARKET AND BROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNICORPORATED COUNTY AREA, (GOODLET) SYSTEM INTEGRITY OCTOBER 2964 080.69159 23,842 INSTALL 2150 FEET OF 4 INCH POLY AND ABANDON 1375 FEET OF 4 INCH CAST IRON, 540 FEET OF 6 INCH CAST IRON, 265 FEET OF 6 INCH STEEL ALONG BEDDELL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2965 080.69161 18,979 INSTALL 1300 FEET OF 4 INCH POLY AND ABANDON 1550 FEET OF 4 INCH CAST IRON ALONG BEDDELL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2966 080.69162 20,595 INSTALL 2009 FEET OF 4 INCH POLY AND ABANDON 813 FEET OF 4 INCH STEEL AND 1007 FEET OF 4 INCH POLY ALONG CLIFF STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2967 080.69164 8,461 INSTALL 285 FEET OF 4 INCH POLY ALONG COOKE AND ABANDON 285 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXA RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 2968 080.69167 26,910 INSTALL 1405 FEET OF 2 INCH AND 820 FEET OF 4 INCH POLY AND ABANDON 925 FEET OF 2 INCH, 1195 FEET OF 4 INCH CAST IRON AND 105 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2969 080.69168 42,619 INSTALL 1375 FEET OF 2 INCH POLY ALONG LLANO AVENUE AND ABANDON 1365 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2970 080.69169 72,023 INSTALL 1945 FEET OF 2 INCH POLY AND ABANDON 1900 FEET OF 4 INCH CAST IRON ALONG VELASCO AVENUE IN ACCORDANE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2971 080.69170 2,363 REPLACE FARM TAP AND 5 FEET OF STEEL ALONG LINE W7. ALL CUSTOMERS JUSTIN SYSTEM INTEGRITY JUNE 2972 080.69171 42,210 INSTALL 2135 FEET OF 2 INCH POLY AND ABANDON 1695 FEET OF 4 INCH CAST IRON, 480 FEET OF 8 INCH CAST IRON AND 170 FEET OF 4 INCH STEEL ALONG FITZHUGH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2973 080.69172 103,419 INSTALL 60 FEET OF 2 INCH AND 2115 FEET OF 4 INCH POLY AND ABANDON 190 FEET OF 4 INCH, 1675 FEET OF 8 INCH CAST IRON, 135 FEET OF 8 INCH POLY AND 105 FEET OF 8 INCH STEEL ALONG WASHINGTON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2974 080.69173 94,302 INSTALL 185 FEET OF 2 INCH POLY, 925 FEET OF 4 INCH POLY AND ABANDON 510 FEET OF 4 INCH CAST IRON, 410 FEET OF 6 INCH CAST IRON, 1675 FEET OF 8 INCH CAST IRON, 160 FEET OF 2 INCH STEEL AND 155 FEET OF 3 INCH STEEL ALONG PEAK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2975 080.69176 20,218 INSTALL 1670 FEET OF 2 INCH POLY AND 345 FEET OF 4 INCH POLY AND ABANDON 1670 FEET OF 4 INCH CAST IRON AND 345 FEET OF 8 INCH CAST IRON ALONG STANFORD AVENUE AND AMHERST AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2976 080.69177 71,690 INSTALL 1925 FEET OF 2 INCH POLY ALONG DELMAR AVENUE AND ABANDON 1850 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2977 080.69178 61,668 INSTALL 500 FEET OF 6 INCH AND 2200 FEET OF 4 INCH POLY AND ABANDON 2075 FEET OF 4 INCH CAST IRON, 500 FEET OF 8 INCH CAST IRON AND 50 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2978 080.69179 52,775 INSTALL 1850 FEET OF 2 INCH POLY AND ABANDON 765 FEET OF 4 INCH CAST IRON, 995 FEET OF 8 INCH CAST IRON ALONG ELMWOOD BLVD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2979 080.69180 40,714 INSTALL 2020 FEET OF 2 INCH POLY ALONG BRITTON DRIVE AND ABANDON 1980 FEET OF 4 INCH CAST IRON, 30 FEET OF 6 INCH CAST IRON AND 10 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2980 080.69181 58,626 INSTALL 1750 FEET OF 4 INCH POLY AND RETIRE 1275 FEET OF 4 INCH CAST IRON AND 500 FEET OF 4 INCH STEEL ALONG AVENUE J IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2981 080.69205 17,743 INSTALL 890 FEET OF 2 INCH POLY AND ABANDON 540 FEET OF 8 INCH CAST IRON MAIN ALONG BOEDECKER DRIVE AND N CENTERAL EXPY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2982 080.69206 83,741 INSTALL 1390 FEET OF 2 INCH POLY, 725 FEET OF 4 INCH POLY ALONG BRIARWOOD LANE AND ABANDON 1390 FEET OF 4 INCH CAST IRON AND 725 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2983 080.69207 47,521 INSTALL 2275 FEET OF 2 INCH POLY, 200 FEET OF 6 INCH POLY AND ABANDON 300 FEET OF 4 INCH CAST IRON, 1940 FEET OF 6 INCH CAST IRON AND 235 FEET OF 8 INCH CAST IRON ALONG CORNELIA LANE AND ALEXANDER DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER MTX Additions Page 94 of 178 313 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 2984 080.69208 73,112 INSTALL 2030 FEET OF 4 INCH POLY AND ABANDON 1305 FEET IF 4 INCH CAST IRON, 385 FEET OF 4 INCH STEEL ALONG REED LN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2985 080.69209 77,820 INSTALL 1660 FEET OF 2 INCH POLY AND 450 FEET OF 4 INCH POLY AND ABANDON 1125 FEET OF 4 INCH CAST IRON, 610 FEET OF 6 INCH CAST IRON AND 355 FEET OF 8 INCH CAST IRON ALONG EDGEFIELD AVENUE AND S POLK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2986 080.69212 22,207 RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH POLY, 100 FEET OF 4 INCH POLY AND AND ABANDON 50 FEET OF 6 INCH AND 100 FEET OF 4 INCH STEEL ALONG WHITE SETTLEMENT ROAD TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 2987 080.69213 6,165 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION ALONG PINE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 2988 080.69220 3,305 INSTALL DISTRICT REGULATOR STATION IN ABILENE AND ABANDON DISTRICT REGULATOR STATION DRS025 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 2989 080.69221 1,950,023 RELOCATE FACILITIES. INSTALL 3,226 FEET OF 6 INCH AND 2,251 FEET OF 8 INCH POLY, 170 FEET OF 10 INCH AND 160 FEET OF 12 INCH STEEL AND ABANDON 2,151 FEET OF 8 INCH, 3,116 FEET OF 4 INCH POLY DUE TO TXDOT ROAD AND DRAINAGE IMPROVEMENTS PROJECT IN ROCKWALL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY DECEMBER 2990 080.69222 1,329 RELOCATE FACILITIES. INSTALL 60 FEET OF 6 INCH POLY ALONG COOK LANE AND ABANDON 35 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF PROSPER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PROSPER RELOCATION OF FACILITIES OCTOBER 2991 080.69224 12,476 REPLACE DISTRICT REGULATOR STATION #46 IN WACO AND ABANDON EXISTING DRS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 2992 080.69226 70,570 INSTALL 2265 FEET OF 4 INCH POLY ALONG ATLANTA STREET AND ABANDON 1600 FEET OF 4 INCH CAST IRON, 575 FEET OF 6 INCH CAST IRON AND 25 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 2993 080.69227 58,206 INSTALL 1290 FEET OF 2 INCH POLY AND ABANDON 1290 FEET OF 4 INCH CAST IRON ALONG WHITWORTH STREET IN ACCORDANCE WITH RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 2994 080.69237 966 INSTALL 1572 FEET OF 4 INCH POLY AND 13998 FEET OF 2 INCH POLY ALONG CHARTWELL CREST. RESIDENTIAL FARMERS BRANCH GROWTH SEPTEMBER 2995 080.69241 27,429 RELOCATE FACILITIES. INSTALL 1400 FEET OF 2 INCH POLY ALONG MADRID DRIVE AND ABANDON 1552 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DUNCANVILLE IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE RELOCATION OF FACILITIES OCTOBER 2996 080.69248 7,992 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION, 95 FEET OF 4 INCH STEEL AND INSTALL 5 FEET OF 2 INCH, 95 FEET OF 4 INCH POLY ALONG LEON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY OCTOBER 2997 080.69262 828 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION ALONG TRINITY BLVD AND POST OAK BLVD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY OCTOBER 2998 080.69274 33,485 INSTALL 1875 FEET OF 4 INCH POLY AND ABANDON 1450 FEET OF 4 INCH CAST IRON ALONG WEST PAFFORD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 2999 080.69275 60,220 INSTALL 1580 FEET OF 4 INCH POLY AND ABANDON 986 FEET OF 4 INCH CAST IRON, 424 FEET OF 6 INCH POLY ALONG DEEN AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3000 080.69277 16,274 INSTALL 1482 FEET OF 4 INCH POLY, AND ABANDON 859 FEET OF 4 INCH CAST IRON, 533 FT OF 4 INCH POLY ALONG REFUGIO AVENUE IN ACCORDANCE WITH RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3001 080.69294 530 ABANDON DISTRICT REGULATOR STATION 233 IN FORT WORTH ALONG 29TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3002 080.69302 41,937 INSTALL 2265 FEET OF 2 INCH POLY MARYLAND AVENUE AND ABANDON 2065 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3003 080.69303 60,767 INSTALL 2140 FEET OF 2 INCH AND 365 FEET OF 4 INCH POLY AND ABANDON 1590 FEET OF 6 INCH CAST IRON AND 765 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3004 080.69304 65,227 INSTALL 3060 FEET OF 2 INCH POLY AND ABANDON 1895 FEET OF 4 INCH CAST IRON, 285 FEET OF 4 INCH POLY AND 440 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3005 080.69312 24,931 RELOCATE FACILITIES. INSTALL 1300 FEET OF 4 INCH POLY AND 150 FEET OF 6 INCH STEEL ALONG SPRING VALLEY ROAD/ FM 2113 AND ABANDON 270 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF HEWITT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEWITT RELOCATION OF FACILITIES OCTOBER 3006 080.69313 33,787 RELOCATE FACILITIES. 2617 FEET OF 2 INCH POLY ALONG GRANDVIEW AND ABANDON 2266 FEET OF 2 INCH AND 351 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3007 080.69315 111,195 INSTALL 180 FEET OF 12 INCH, 2060 FEET OF 8 INCH, 1100 FEET OF 6 INCH AN 285 FEET OF 2 INCH POLY AND ABANDON 2180 FEET OF 16 INCH STEEL, 50 FEET OF 8 INCH POLY, 150 FEET OF 6 INCH STEEL AND 150 FEET OF 2 INCH STEEL IN ACCORDANE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3008 080.69316 8,581 INSTALL 550 FEET OF 2 INCH POLY ALONG ROUNDROCK TRAIL AND ABANDON 550 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY OCTOBER 3009 080.69317 817 INSTALL 405 FEET OF 6 INCH AND 250 FEET OF 2 INCH POLY ALONG MONTGOMERY BOULEVARD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ALLEN GROWTH MARCH 3010 080.69321 11,752 INSTALL 2555 FEET OF 2 INCH POLY ALONG THE STREETS OF HOMESTEAD SUBDIVISION IN SUNNYVALE TX. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SUNNYVALE GROWTH NOVEMBER 3011 080.69323 42,158 INSTALL 1800 FEET OF 2 INCH POLY AND ABANDON 1565 FEET OF 4 INCH, 485 FEET OF 6 INCH CAST IRON, 170 FEET OF 2 INCH AND 20 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3012 080.69331 7,770 INSTALL 5 FEET OF 2 INCH STEEL ALONG CR 186 AND ABANDON 5 FEET OF 2 INCH STEEL IN ACCRODANCE WITH THE RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS COOLIDGE SYSTEM INTEGRITY OCTOBER 3013 080.69333 11,856 INSTALL 2,592 FEET OF 2 INCH AND 2,366 FEET OF 4 INCH POLY ALONG LEAF DRIVE. RESIDENTIAL NOLANVILLE GROWTH DECEMBER 3014 080.69341 24,067 RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH AND 990 FEET OF 4 INCH POLY ALONG BUSINESS 78 AND ABANDON 63 FEET OF 1.25 INCH, 45 FEET OF 2 INCH STEEL, 930 FEET OF 4 INCH STEEL AND 27 FEET OF 4 INCH POLY TO ACCOMMODATE FARMERSVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE RELOCATION OF FACILITIES OCTOBER 3015 080.69344 38,566 RELOCATE FACILITIES. 2510 FEET OF 2 INCH POLY ALONG DESSERT RIDGE DRIVE AND ABANDON 416 FEET OF 2 INCH, 2079 FEET OF 3 INCH AND 15 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3016 080.69349 9,612 RELOCATE FACILITIES. INSTALL 20 FEET OF 6 INCH POLY ALONG GARAPAN DR AND ABANDON 20 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 3017 080.69373 30,899 INSTALL DRS 423 AND ABANDON DRS 423 ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3018 080.69375 35,535 INSTALL 1600 FEET OF 6 INCH POLY ALONG OLD ANSON ROAD AND HWY 277 AND ABANDON 792 FEET OF 4 INCH STEEL AND 791 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER MTX Additions Page 95 of 178 314 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3019 080.69378 5,902 INSTALL 25 FEET OF 2 INCH POLY ALONG GREENBRIAR ROAD. COMMERCIAL OR INDUSTRIAL WICHITA FALLS GROWTH JUNE 3020 080.69414 30,018 RELOCATE FACILITIES. INSTALL 110 FEET OF 4 INCH POLY AND ABANDON 105 FEET OF 4 INCH POLY ALONG GALLOWAY AVENUE TO ACCOMMODATE STORM DRAIN TXDOT PROJECT. ALL CUSTOMERS MESQUITE RELOCATION OF FACILITIES DECEMBER 3021 080.69417 10,369 RELOCATE FACILITIES. INSTALL 320 FEET OF 6 INCH, 30 FEET OF 4 INCH AND 30 FEET OF 2 INCH POLY ALONG W MORPHY STREET AND ABANDON 320 FEET OF 6 INCH, 25 FEET OF 4 INCH AND 25 FEET OF 2 INCH STEEL 5 FEET OF 4 INCH AND 5 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3022 080.69420 11,798 RELOCATE FACILITIES. INSTALL 630 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG DENVER AVENUE AND ABANDON 780 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3023 080.69426 8,096 RELOCATE FACILITIES. INSTALL 540 FEET OF 4 INCH POLY ALONG FOSTER AND ABANDON 520 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF COLLEGE STATION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES OCTOBER 3024 080.69430 37,889 INSTALL 2000 FEET OF 4 INCH POLY ALONG AVENUE L IN FORT WORTH AND ABANDON 1700 FEET OF 4 INCH CAST IRON, 300 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3025 080.69432 8,957 INSTALL 596 FEET OF 4 INCH POLY AND ABANDON 596 FEET OF 4 INCH POLY ALONG COOPER MOUNTAIN DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 3026 080.69433 24,025 INSTALL 675 FEET OF 4 INCH POLY, AND ABANDON 670 FEET OF 4 INCH STEEL, 58 FEET OF 4 INCH POLY ALONG HUTHCINSON STREET AND HALE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3027 080.69434 38,910 INSTALL 1700 FEET OF 4 INCH POLY ALONG AVENUE M IN FORT WORTH TX AND ABANDON 1300 FEET OF 4 INCH CAST IRON, 400 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3028 080.69435 25,074 INSTALL 1300 FEET OF 2 INCH POLY ALONG CHERRYWOOD AVENUE AND ABANDON 920 FEET OF 4 INCH CAST IRON, 345 FEET OF 8 INCH CAST IRON, 10 FEET OF 4 INCH POLY AND 25 FEET OF 8 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3029 080.69436 84,980 INSTALL 1690 FEET OF 2 INCH AND 760 FEET OF 4 INCH POLY AND ABANDON 1545 FEET OF 4 INCH AND 760 FEET OF 6 INCH CAST IRON ALONG IILINOIS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3030 080.69437 34,869 INSTALL 1300 FEET OF 2 INCH POLY AND ABANDON 1160 FEET OF 4 INCH AND 780 FEET OF 6 INCH CAST IRON ALONG 7TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3031 080.69438 58,643 INSTALL 1015 FEET OF 2 INCH POLY AND 650 FEET OF 4 INCH POLY AND ABANDON 1535 FEET OF 4 INCH CAST IRON AND 100 FEET OF 4 INCH POLY ALONG TRAVIS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3032 080.69439 3,224 INSTALL 385 FEET OF 2 INCH POLY ALONG LOUIS J. RODRQUEZ AND ABANDON 385 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3033 080.69440 35,507 INSTALL 720 FEET OF 4 INCH POLY AND ABANDON 755 FEET OF 4 INCH CAST IRON, 650 FEET OF 8 INCH CAST IRON, 45 FEET OF 2 INCH POLY AND 215 FEET OF 2 INCH STEEL ALONG BUENA VISTA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3034 080.69441 85,116 INSTALL 1405 FEET OF 2 INCH POLY, 860 FEET OF 4 INCH POLY ALONG VANDELIA STREET AND ABANDON 1120 FEET OF 4 INCH CAST IRON, 2190 FEET OF 6 INCH CAST IRON, 835 FEET OF 8 INCH CAST IRON, 55 FEET OF 6 INCH POLY, 780 FEET OF 4 INCH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3035 080.69447 8,400 INSTALL 325 FEET OF 4 INCH POLY AND ABANDON 465 FEET OF 6 INCH POLY, 74 FEET OF 6 INCH STEEL, 41 FEET OF 8 INCH STEEL ALONG ROSS AVENUE AND CLINT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3036 080.69451 259,356 INSTALL 4,150 FEET OF 2 INCH POLY ALONG THE STREETS OF ANNA CROSSING VILLAS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ANNA GROWTH JUNE 3037 080.69469 2,023 INSTALL 2860 FEET OF 4 INCH POLY TO SERVE THE MCKINNEY AIRPORT CENTER IN MCKINNEY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MCKINNEY GROWTH MARCH 3038 080.69470 46,750 INSTALL 1755 FEET OF 2 INCH POLY AND ABANDON 2040 FEET OF 4 INCH AND 445 FEET OF 6 INCH CAST IRON ALONG VICKERY BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3039 080.69484 5,401 RELOCATE FACILITIES. INSTALL 470 FEET OF 4 INCH POLY AND ABANDON 460 FEET OF 4 INCH POLY ALONG SEETON ROAD TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES OCTOBER 3040 080.69491 9,420 RELOCATE FACILITIES. INSTALL 350 FEET OF 6 INCH POLY ALONG FM 2181 AND ABANDON 300 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF DENTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 3041 080.69504 18,012 RELOCATE FACILITIES. INSTALL 120 FEET OF 6 INCH POLY AND ABANDON 120 FEET OF 6 INCH POLY ALONG PENNSYLVANIA AVENUE TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3042 080.69519 10,958 RELOCATE FACILITES. INSTALL 2 POLY SERVICE LINES AND ABANDON 2 POLY SERVICE LINES ALONG PLEASANT RUN ROAD TO ACCOMMODATE THE CITY OF COLLEYVILLE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE RELOCATION OF FACILITIES OCTOBER 3043 080.69561 10,680 RELOCATE FACILITIES. INSTALL 180 FEET OF 6 INCH AND 450 FEET OF 2 INCH POLY ALONG WEST VICKERY BOULEVARD AND ABANDON 400 FEET OF 4 INCH POLY AND 50 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3044 080.69562 157 RELOCATE FACILITIES. ABANDON 147 FEET OF 6 INCH POLY ALONG PIETRA LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3045 080.69563 2,940 ABANDON DRS08 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY OCTOBER 3046 080.69569 46,088 INSTALL 1875 FEET OF 4 POLY AND RETIRE 1950 FEET OF 4 INCH CAST IRON, 365 FEET OF 4 INCH POLY ALONG W. DREW STREET IN FORT WORTH TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3047 080.69584 8,445 INSTALL DISTRICT REGULATOR STATION 40 ALONG THE STREETS OF N 33RD STREET AND N 34TH STREET IN WACO AND ABANDON DISTRICT REGULATOR STATION 40 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 3048 080.69592 2,996 INSTALL DISTRICT REGULATOR STATION 023 IN ABILENE AND ABANDON DISTRICT REGULATOR STATION 023 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 3049 080.69598 11,495 ABANDON DISTRICT REGULATOR STATION #069 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3050 080.69599 10,927 INSTALL DISTRICT REGULATOR STATION 49 ALONG THE STREETS OF N 42ND STREET AND SANGER STREET IN WACO AND ABANDON DISTRICT REGULATOR STATION 49 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 3051 080.69608 1,586 INSTALL 1163 FEET OF 6 INCH, 2114 FEET OF 4 INCH, AND 2851 FEET OF 2 INCH POLY ALONG THE STREETS OF SHADOWGLEN DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANOR GROWTH JUNE 3052 080.69622 347 INSTALL 5000 FEET OF 2 INCH AND 250 FEET OF 6 INCH POLY ALONG STAG LEAP LANE. RESIDENTIAL ARLINGTON GROWTH MARCH 3053 080.69629 2,458 RELOCATE FACILITIES. INSTALL 314 FEET OF 6 INCH POLY AND ABANDON 294 FEET OF 6 INCH POLY ALONG CUSTER ROAD. ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES DECEMBER MTX Additions Page 96 of 178 315 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3054 080.69631 3,395 RELOCATE FACILITIES. INSTALL 702 FEET OF 4 INCH POLY AND ABANDON 272 FEET OF 4 INCH POLY ALONG COIT ROAD. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 3055 080.69647 956 INSTALL 3984 FEET OF 8 INCH POLY ALONG COUNTY ROAD 176. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROUND ROCK GROWTH MARCH 3056 080.69666 32,575 RELOCATE FACILITIES. INSTALL 2143 FEET OF 2 INCH POLY ALONG WEST 4TH AND ABANDON 1200 FEET OF 2 INCH BARE STEEL AND 400 FEET OF 2 INCH COATED STEEL AND 543 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF CORSICANA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA RELOCATION OF FACILITIES OCTOBER 3057 080.69673 17,598 RELOCATE FACILITIES. INSTALL 1550 FEET OF 2 INCH AND 80 FEET OF 4 INCH POLY ALONG NORTH FREY AND EAST COLLINS AND ABANDON 1550 FEET OF 2 INCH AND 80 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF CORSICANA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA RELOCATION OF FACILITIES OCTOBER 3058 080.69675 16,954 INSTALL LEAK REPAIRS IN THE BOYD AREA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD SYSTEM INTEGRITY OCTOBER 3059 080.69676 10,412 INSTALL 575 FEET OF 4 INCH AND 2167 FEET OF 2 INCH POLY ALONG THE STREETS OF KASPER SECTION 10. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER 3060 080.69687 22,011 RELOCATE FACILITIES. INSTALL 2100 FEET OF 2 INCH POLY ALONG FONTANA AVENUE AND ABANDON 2100 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF RICHARDSON IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES OCTOBER 3061 080.69695 704 ABANDON DISTRICT REGULATOR STATION 036 IN DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3062 080.69697 32,056 RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH AND 900 FEET OF 4 INCH POLY ALONG MARSHALL DRIVE AND BRENT COURT AND ABANDON 1700 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF GRAND PRAIRIE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES OCTOBER 3063 080.69706 535 ABANDON DISTRICT REGULATOR STATION #017 IN DALLAS, DALLAS COUNTY AS PART OF THE AREA REPLACEMENT PROJECT AR ID#2835.1 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3064 080.69707 11,384 RELOCATE FACILITIES. INSTALL 785 FEET OF 2 INCH POLY AND ABANDON 395 FEET OF 3 INCH AND 390 FEET OF 4 INCH STEEL ALONG MEEK STREET TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 3065 080.69716 6,095 RELOCATE FACILITIES. INSTALL 90 FEET OF 6 INCH POLY ALONG WESTPORT PARKWAY AND ABANDON 80 FEET OF 6 INCH POLY TO ACCOMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3066 080.69719 74,107 RELOCATE FACILITIES. INSTALL 400 FEET OF 6 INCH POLY 4900 FEET OF 4 INCH POLY ALONG STONEWALL STREET AND ABANDON 175 FEET OF 6 INCH, 1680 FEET OF 4 INCH STEEL,50 FEET OF 4 INCH POLY, 2865 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF GREENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE RELOCATION OF FACILITIES OCTOBER 3067 080.69720 4,922 REPLACE GROUND BED ON C16-3 SYSTEM IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY OCTOBER 3068 080.69728 5,760 INSTALL 585 FEET OF 4 INCH POLY ALONG W AVE L AND ABANDON 6 FEET OF 6 INCH POLY AND 75 FEET OF 3 INCH STEEL AND 485 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER 3069 080.69740 18,471 RELOCATE FACILITIES. INSTALL 700 FEET OF 12 INCH POLY ALONG AVENUE G AND ABANDON 700 FEET OF 12 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3070 080.69746 9,321 INSTALL 1057 FEET OF 4 INCH POLY ALONG EAST DIETERT AND ABANDON 1146 FEET OF 4 INCH STEEL IN ACCORDANCE&NBSP; WITH RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER 3071 080.69753 65,979 INSTALL 3712 FEET OF 2 INCH, 2841 FEET OF 4 INCH AND 2692 FEET OF 6 INCH POLY ALONG STREETS OF COTTONWOOD CREEK PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH JANUARY 3072 080.69755 5,685 RELOCATE FACILITIES. INSTALL 390 FEET OF 2 INCH POLY ALONG HWY 679 S OF LEXINGTON AND ABANDON 1112 FEET OF 4 INCH AND 2 FEET OF 2 INCH POLY 15 FEET OF 2 INCH AND 412 FEET OF 3 INCH STEEL AND 190 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF GORMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORMAN SYSTEM INTEGRITY OCTOBER 3073 080.69757 6,907 INSTALL REGULATOR STATION IN IRVING AND ABANDON REGULATOR STATION MLR 10 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER 3074 080.69760 50,170 RELOCATE FACILITIES. INSTALL 70 FEET OF 2 INCH POLY ALONG MARYS CREEK DRIVE AND 2300 FEET OF 16 INCH STEEL AND ABANDON 932 FEET OF 2 INCH STEEL AND 2216 FEET OF 16 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH SEWER IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES DECEMBER 3075 080.69761 21,616 INSTALL 145 FEET OF 4 INCH POLY, 50 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 03 AND 05 ALONG N. TAYLOR STREET AND ABANDON 70 FEET OF 3 INCH STEEL, 125 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LADONIA SYSTEM INTEGRITY OCTOBER 3076 080.69779 8,649 RELOCATE FACILITIES. REPLACE 5 SERVICE LINES ALONG HANDLEY DRIVE TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3077 080.69783 66,806 INSTALL 1815 FEET OF 2 INCH POLY AND ABANDON 435 FEET OF 4 INCH CAST IRON AND 1380 FEET OF 6 INCH CAST IRON ALONG LATIMER STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3078 080.69785 1,632 RELOCATE FACILITIES. INSTALL 50 FEET OF 4 INCH POLY AND ABANDON 30 FEET OF 3 INCH POLY ALONG PECAN PARK DRIVE TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 3079 080.69790 5,508 INSTALL 620 FEET OF 2 INCH POLY ALONG FRANCISCO LEMOS STREET AND ABANDON 584 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER 3080 080.69793 16,613 RELOCATE FACILITIES. REPLACE 50 SERVICE LINES ALONG ELLIS ROAD TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3081 080.69803 7,763 RELOCATE FACILITIES. INSTALL 370 FEET OF 4 INCH POLY AND ABANDON 348 FEET OF 3 INCH STEEL ALONG WEBSTER AND 4TH TO ACCOMMODATE THE CITY OF GLEN ROSE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLEN ROSE RELOCATION OF FACILITIES OCTOBER 3082 080.69813 705 RELOCATE FACILITIES. INSTALL 120 FEET OF 3 INCH STEEL AND ABANDON 120 FEET OF 3 INCH STEEL ALONG LINE W4 IN DENTON COUNTY TO ACCOMODATE STORM SEWER PROJECT. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES MARCH 3083 080.69845 16,597 RELOCATE FACILITIES. INSTALL 960 FEET OF 6 INCH POLY ALONG HILLCREST AND CRESTLINE ROAD AND ABANDON 946 FEET OF 6 INCH STEEL TO ACCOMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3084 080.69850 775 INSTALL 5410 FEET OF 2 INCH AND 2120 FEET OF 6 INCH POLY ALONG STREETS OF THE WINCHESTER SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PRINCETON GROWTH MARCH 3085 080.69863 21,814 INSTALL 782 FEET OF 2 INCH POLY ALONG CRESTVIEW IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARBLE FALLS SYSTEM INTEGRITY OCTOBER 3086 080.69873 1,352 INSTALL 225 FEET OF 2 INCH POLY AND ABANDON 154 FEET OF 3 INCH CAST IRON ALONG PINE AND CARDINAL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ECTOR SYSTEM INTEGRITY OCTOBER 3087 080.69887 454 INSTALL 3400 FEET OF 8 INCH POLY ALONG FM 2331. ALL CUSTOMERS GODLEY GROWTH APRIL MTX Additions Page 97 of 178 316 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3088 080.69896 3,661 RELOCATE FACILITIES. INSTALL 330 FEET OF 2 INCH POLY AND ABANDON 325 FEET OF 2 INCH STEEL ALONG E. GANTT STREET TO ACCOMMODATE THE CITY OF PRINCETON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PRINCETON RELOCATION OF FACILITIES OCTOBER 3089 080.69904 7,154 RELOCATE FACILITIES. INSTALL 525 FEET OF 4 INCH POLY ALONG FM 8 AND ABANDON 340 FEET OF 4 INCH, 139 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF STEPHENVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE RELOCATION OF FACILITIES OCTOBER 3090 080.69907 3,117 RELOCATE FACILITIES. INSTALL 230 FEET OF 4 INCH POLY AND ABANDON 206 FEET OF 4 INCH STEEL ALONG W 17TH STREET TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES OCTOBER 3091 080.69912 9,598 INSTALL 360 FEET OF 2 INCH, ALONG 5TH AVE AT PECAN AND ABANDON 240 FEET OF 3 INCH STEEL AND 106 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY OCTOBER 3092 080.69922 1,175 INSTALL 100 FEET OF 2 INCH POLY ALONG JO PIERCE STREET. RESIDENTIAL DALLAS GROWTH JULY 3093 080.69925 1,987 INSTALL 5,908 FEET OF 6 INCH, 3,379 FEET OF 4 INCH AND 3,721 FEET OF 2 INCH POLY ALONG THE STREETS OF WILDCAT RIDGE PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GODLEY GROWTH MARCH 3094 080.69932 (36,300) INSTALL 799 FEET OF 4 INCH AND 183 FEET OF 2 INCH POLY AND ABANDON 740 FEET OF 3 INCH AND 228 FEET OF 2 INCH POLY ALONG PLANO PARKWAY. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES SEPTEMBER 3095 080.69934 5,994 RELOCATE FACILITIES. INSTALL 349 FEET OF 4 INCH POLY AND ABANDON 334 FEET OF 4 INCH POLY ALONG CITY LINE TO ACCOMMODATE DART SILVER LINE RAIL PROJECT. ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES DECEMBER 3096 080.69940 2,979 RELOCATE FACILITIES. INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 255 FEET OF 2 INCH STEEL ALONG COUNTRY CLUB ROAD TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS RELOCATION OF FACILITIES OCTOBER 3097 080.69956 3,928 RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY AND ABANDON 100 FEET OF 2 INCH STEEL ALONG HERVIE STREET TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3098 080.69957 9,486 RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG LOCKE AVENUE AND ABANDON 900 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3099 080.69958 41,708 RELOCATE FACILITIES. INSTALL 1940 FEET OF 4 INCH POLY ALONG VOLDER AVENUE AND ABANDON 1940 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3100 080.69962 7,995 RELOCATE FACILITIES. INSTALL 62 FEET OF 4 INCH POLY AND ABANDON 40 FEET OF 4 INCH POLY ALONG WINDY RYON WAY AND HIGHWAY 287 TO ACCOMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3101 080.69967 4,488 INSTALL DISTRICT REGULATOR STATION 24 ALONG THE STREETS OF MAIN STREET AND BOOTH STREET AND DISTRICT REGULATOR STATION 28 ALONG THE STREETS OF SYMES STREET AND GANO STREET AND ABANDON DISTRICT REGULATOR STATION 16 ALONG W MARTIN LUTHER KING JR BLVD AND STURGIS STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR SYSTEM INTEGRITY OCTOBER 3102 080.69978 8,926 INSTALL 600 FEET OF 2 INCH POLY ALONG SAUNDERS (FM 814) AND ABANDON 505 FEET OF 3 INCH AND 286 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY OCTOBER 3103 080.69981 10,714 RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH POLY ALONG WJ BOAZ AND ABANDON 300 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3104 080.69999 340 INSTALL 3,480 FEET OF 2 INCH, 1,350 FEET OF 4 INCH AND 2,080 FEET OF 6 INCH POLY ALONG THE STREETS OF TRADITION PHASE 1A. RESIDENTIAL FORT WORTH GROWTH JUNE 3105 080.70009 4,415 ABANDON DISTRICT REGULATOR STATION #263 ALONG THE STREETS OF S LLEWELLYN AND W PAGE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3106 080.70046 287,224 RELOCATE FACILITIES. INSTALL 1300 FEET OF 2 INCH POLY ALONG RYANRIDGE STREET AND ABANDON 1300 FEET OF 2 INCH STEEL TO ACCOMODATE THE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JUNE 3107 080.70066 8,642 INSTALL 1 GROUND BED, RECTIFIER AND TEST STATION ALONG LINE L14 IN BELL COUNTY AND ABANDON 1 GROUND BED, RECTIFIER AND TEST STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY OCTOBER 3108 080.70083 31,164 INSTALL 1778 FEET OF 8 INCH POLY, 2818 FEET OF 4 INCH AND 5633 FEET OF 2 INCH POLY ALONG THE STREETS OF PARKSIDE ON THE RIVER PHASE 1A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH MARCH 3109 080.70094 18,803 RELOCATE FACILITIES. INSTALL 850 FEET OF 2 INCH POLY ALONG RED BUD LANE AND ABANDON 850 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3110 080.70099 3,381 INSTALL DISTRICT REGULATOR STATION IN TEMPLE AND ABANDON DISTRICT REGULATOR STATION 23 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER 3111 080.70104 54,948 RELOCATE FACILITIES. INSTALL 3500 FEET OF 4 INCH AND 300 FEET OF 2 INCH POLY ALONG NW 7TH STREET AND ABANDON 2700 FEET OF 4 INCH AND 450 FEET OF 6 INCH STEEL AND 230 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF GRAND PRAIRIE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES OCTOBER 3112 080.70106 807 INSTALL 10,930 FEET OF 2 INCH AND 1200 FEET OF 12 INCH POLY ALONG THE STREETS OF THE THIRD PHASE OF THE WINCHESTER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PRINCETON GROWTH MARCH 3113 080.70121 1,619 INSTALL 270 FEET OF 2 INCH POLY ALONG SOUTH ASH AND ABANDON 270 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARCHER CITY SYSTEM INTEGRITY OCTOBER 3114 080.70123 12,800 INSTALL 2,907 FEET OF 6 INCH POLY ALONG THE STREETS OF SANTA RITA FLOWER VALLEY SUBDIVISION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LIBERTY HILL GROWTH JULY 3115 080.70124 331 INSTALL 1 DISTRICT REGULATOR STATION IN FORT WORTH AND ABANDON DISTRICT REGULATOR STATION 522 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3116 080.70126 10,064 INSTALL 1712 FEET OF 8 INCH, 1165 FEET OF 6 INCH, 292 FEET OF 4 INCH AND 786 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH JULY 3117 080.70128 13,561 INSTALL 337 FEET OF 6 INCH AND 478 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH NORTH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH JUNE 3118 080.70137 4,936 RELOCATE FACILITIES: REPLACE METER INSTALLATIONS AND METER EQUIPMENT DUE TO RELOCATION OF RK HALL ASPHALT PLANT. ALL CUSTOMERS GREENVILLE RELOCATION OF FACILITIES APRIL 3119 080.70139 326 INSTALL DISTRICT REGULATOR STATION IN FORT WORTH AND ABANDON DISTRICT REGULATOR STATION #517 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3120 080.70141 11,482 INSTALL 1633 FEET OF 4 INCH AND 3406 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH NORTH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH JULY 3121 080.70142 3,395 ABANDON DISTRICT REGULATOR STATION #127 ALONG THE STREETS OF W 6TH STREET AND WOODLAWN AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3122 080.70144 548 ABANDON 1325 FEET OF 2 INCH STEEL AND 793 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KIRKLAND SYSTEM INTEGRITY OCTOBER MTX Additions Page 98 of 178 317 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3123 080.70149 15,208 INSTALL 1272 FEET OF 4 INCH POLY AND ABANDON 329 FEET OF 8 INCH, 17 FEET OF 4 INCH AND 91 FEET OF 2 INCH STEEL 440 FEET OF 3 INCH AND 219 FEET OF 2 INCH POLY ALONG CHESTNUT AND CRAWFORD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER 3124 080.70155 1,475 ABANDON DISTRICT REGULATOR STATION #09 ALONG PENELOPE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY OCTOBER 3125 080.70158 2,436 RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG 509 COULTER DRIVE AND ABANDON 100 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF BRYAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES OCTOBER 3126 080.70161 83,890 RELOCATE FACILITIES. INSTALL 251 FEET OF 2 INCH POLY AND ABANDON 243 FEET OF 2 INCH STEEL TO ACCOMMODATE DART RAIL PROJECT. ALL CUSTOMERS ADDISON RELOCATION OF FACILITIES OCTOBER 3127 080.70162 4,512 RELOCATE FACILITIES. INSTALL 482 FEET IF 4 INCH POLY AND ABANDON 296 FEET OF 4 INCH POLY ALONG INDUSTRIAL TO ACCOMMODATE DART SILVE LINE RAIL PROJECT. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES DECEMBER 3128 080.70166 1,460 ABANDON DISTRICT REGULATOR STATION 153 ALONG THE STREETS OF MARSALIS AVENUE AND HOBSON AVENUE IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3129 080.70169 18,287 INSTALL 880 FEET OF 2 INCH POLY AND ABANDON 1780 FEET OF 1.25 INCH POLY ALONG CLOTELL DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3130 080.70173 1,294 ABANDON DISTRICT REGULATOR STATION 152 ALONG THE STREETS OF BECKLEY AVENUE AND HOBSON AVENUE IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3131 080.70176 9,802 INSTALL 1100 FEET OF 4 INCH POLY ALONG INDUSTRIAL BOULEVARD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL ROCKWALL GROWTH JUNE 3132 080.70189 276,885 INSTALL 5973 FEET OF 12 INCH AND 3510 FEET OF 8 INCH POLY ALONG FM 3040 AND ABANDON 1570 FEET OF 6 INCH POLY, 510 FEET OF 4 INCH, 455 FEET OF 2 INCH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY OCTOBER 3133 080.70193 1,366,620 REPLACE AMLD MAINS 5 TO 250 IN THE NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 3134 080.70194 4,225,344 REPLACE AMLD MAINS 5 TO 250 IN THE NORTH CENTRAL REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER 3135 080.70195 3,162,396 REPLACE AMLD MAINS 5 TO 250 IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD SYSTEM INTEGRITY DECEMBER 3136 080.70196 5,531,349 REPLACE AMLD MAINS 5 TO 250 IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 3137 080.70197 2,656,660 REPLACE AMLD MAINS 5 TO 250 IN THE SOUTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 3138 080.70198 304,258 REPLACE AMLD MAINS 5 TO 250 IN THE SOUTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY DECEMBER 3139 080.70199 366,167 REPLACE AMLD MAINS 5 TO 250 IN THE WEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 3140 080.70200 1,306,886 REPLACE AMLD MAINS 5 TO 250 IN THE WEST ARLINGTON IRVING REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 3141 080.70201 21,763,165 REPLACE AMLD MAINS 5 TO 250 IN THE WEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 3142 080.70202 2,666,062 REPLACE AMLD SERVICE LINES IN THE NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY DECEMBER 3143 080.70203 3,929,035 REPLACE SERVICE LINES IN WICHITA FALLS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 3144 080.70204 5,545,613 REPLACE SERVICE LINES IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 3145 080.70205 3,725,165 REPLACE SERVICE LINES IN MCKINNEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER 3146 080.70206 3,159,102 REPLACE SERVICE LINES IN WACO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 3147 080.70207 317,300 REPLACE SERVICE LINES IN FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 3148 080.70208 1,890,367 REPLACE SERVICE LINES IN ARLINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 3149 080.70209 242,243 REPLACE SERVICE LINES IN ROUND ROCK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY DECEMBER 3150 080.70210 9,376,752 REPLACE SERVICE LINES IN ABILENE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 3151 080.70211 2,001,905 REPLACE MAIN 5-250' IN THE NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY DECEMBER 3152 080.70212 4,830,334 REPLACE MAIN 5-250' IN THE NORTH CENTRAL REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER 3153 080.70213 10,766,527 REPLACE MAIN 5-250' IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD SYSTEM INTEGRITY DECEMBER 3154 080.70214 7,939,148 REPLACE MAIN 5-250' IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 3155 080.70215 4,444,407 REPLACE MAIN 5-250' IN THE SOUTH EAST REGION DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 3156 080.70216 1,950,723 REPLACE MAIN 5-250' IN THE SOUTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY DECEMBER 3157 080.70217 3,502,292 REPLACE MAIN 5-250' IN THE WEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 3158 080.70218 1,636,588 REPLACE MAIN 5-250' IN THE WEST ARLINGTON IRVING REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 3159 080.70219 6,023,679 REPLACE MAIN 5-250' IN THE WEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY DECEMBER 3160 080.70220 4,617,979 REPLACE SERVICE LINES IN THE NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY DECEMBER 3161 080.70221 3,991,219 REPLACE SERVICE LINES IN THE NORTH CENTRAL REGION ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY DECEMBER 3162 080.70222 9,157,730 REPLACE SERVICE LINES IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD SYSTEM INTEGRITY DECEMBER 3163 080.70223 15,729,885 REPLACE SERVICE LINES IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY DECEMBER 3164 080.70224 3,864,974 REPLACE SERVICE LINES IN THE SOUTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY DECEMBER 3165 080.70225 2,523,550 REPLACE SERVICE LINES IN THE SOUTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY DECEMBER 3166 080.70226 5,364,278 REPLACE SERVICE LINES IN THE WEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 3167 080.70227 2,204,967 REPLACE SERVICE LINES IN THE WEST ARLINGTON IRVING REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY DECEMBER 3168 080.70228 3,173,607 REPLACE SERVICE LINES IN THE WEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 3169 080.70229 6,432,603 REPLACE METERS IN THE NORTH EAST REGION DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY DECEMBER 3170 080.70230 6,520,284 REPLACE METERS IN THE NORTH CENTRAL REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY DECEMBER 3171 080.70231 4,119,940 REPLACE METERS IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 3172 080.70232 12,583,624 REPLACE METERS IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY DECEMBER 3173 080.70233 4,988,242 REPLACE METERS IN THE SOUTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 3174 080.70234 2,858,350 REPLACE METERS IN THE SOUTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY DECEMBER MTX Additions Page 99 of 178 318 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3175 080.70235 5,073,914 REPLACE METERS IN THE WEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 3176 080.70236 4,056,290 REPLACE METERS IN THE WEST ARLINGTON IRVING REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 3177 080.70237 3,610,461 REPLACE METERS IN THE WEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 3178 080.70249 11,207 REPLACE DISTRICT REGULATOR STATION # 07 AND 11 IN STEPHENVILLE AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY OCTOBER 3179 080.70252 4,774 INSTALL 400 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 02 AND 300 FEET OF 2 INCH POLY AND 1331 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLDEN SYSTEM INTEGRITY OCTOBER 3180 080.70254 7,339 RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY AND 40 FEET OF 2 INCH POLY ALONG SW 5TH STREET AND ABANDON 390 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF GRAND PRAIRIE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES OCTOBER 3181 080.70256 2,011 RELOCATE FACILITIES. INSTALL 60 FEET OF 4 INCH POLY ALONG MEADOW CREEK DRIVE AND ABANDON 60 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF IRVING IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 3182 080.70258 6,979 ABANDON DISTRICT REGULATOR STATION 09 AND 11 IN COMANCHE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY OCTOBER 3183 080.70259 22,273 INSTALL DISTRICT REGULATOR STATION AND 5 FEET OF 4 INCH STEEL AND 5 FEET OF 6 INCH POLY ALONG RAMBLING WAY AND PARKER ROAD AND ABANDON DISTRICT REGULATOR STATION AND 5 FEET OF 4 INCH STEEL AND 5 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY OCTOBER 3184 080.70260 16,574 INSTALL 320 FEET OF 2 INCH POLY AND INSTALL DISTRICT REGULATOR STATION 07,12 AND 23 ALONG W 16TH STREET AND ABANDON 540 FEET OF 2 INCH STEEL, 130 FEET OF 2 INCH POLY, 14 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION 07, 12, AND 23 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY OCTOBER 3185 080.70268 2,618 RELOCATE FACILITIES. INSTALL 240 FEET OF 4 INCH POLY ALONG FRANCIS DRIVE AND ABANDON 240 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF COLLEGE STATION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES OCTOBER 3186 080.70272 19,780 RELOCATE FACILITIES. INSTALL 100 FEET OF 6 INCH POLY ALONG PARKER ROAD AND CUSTER PKWY AND ABANDON 100 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF PLANO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES OCTOBER 3187 080.70274 15,926 RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH STEEL ALONG NANTUCKET ROAD AND ABANDON 40 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF RICHARDSON CITY PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES OCTOBER 3188 080.70275 4,134 RELOCATE FACILITIES. INSTALL 330 FEET OF 4 INCH POLY ALONG SEETON ROAD AND ABANDON 550 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF GRAND PRAIRIE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES OCTOBER 3189 080.70277 18,937 INSTALL CLOCK SPRING ON LINE D IN DALLAS COUNTY TO REMEDIATE ANOMALIES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3190 080.70285 44 ABANDON DISTRICT REGULATOR STATION #273 IN DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3191 080.70289 8,387,690 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN NORTH EAST REGION. ALL CUSTOMERS PARIS GROWTH DECEMBER 3192 080.70290 9,806,771 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN NORTH CENTRAL REGION. ALL CUSTOMERS MCKINNEY GROWTH DECEMBER 3193 080.70291 8,315,121 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN NORTH WEST REGION. ALL CUSTOMERS WICHITA FALLS GROWTH DECEMBER 3194 080.70292 11,503,145 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN SOUTH DALLAS REGION. ALL CUSTOMERS DALLAS GROWTH DECEMBER 3195 080.70293 4,594,617 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN SOUTH EAST REGION. ALL CUSTOMERS WACO GROWTH DECEMBER 3196 080.70294 11,918,939 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN SOUTH WEST REGION. ALL CUSTOMERS ROUND ROCK GROWTH DECEMBER 3197 080.70295 10,077,022 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN WEST FORT WORTH REGION. ALL CUSTOMERS FORT WORTH GROWTH DECEMBER 3198 080.70296 4,468,104 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN WEST ARLINGTON REGION. ALL CUSTOMERS ARLINGTON GROWTH DECEMBER 3199 080.70297 1,897,312 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN WEST REGION. ALL CUSTOMERS ABILENE GROWTH DECEMBER 3200 080.70298 3,464,712 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN NORTH EAST REGION. ALL CUSTOMERS PARIS GROWTH DECEMBER 3201 080.70299 4,487,077 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN NORTH CENTRAL REGION. ALL CUSTOMERS MCKINNEY GROWTH DECEMBER 3202 080.70300 3,554,582 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN NORTH WEST REGION. ALL CUSTOMERS WICHITA FALLS GROWTH DECEMBER 3203 080.70301 1,804,178 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN SOUTH REGION. ALL CUSTOMERS WACO GROWTH DECEMBER 3204 080.70302 2,106,031 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN SOUTH EAST REGION. ALL CUSTOMERS WACO GROWTH DECEMBER 3205 080.70303 4,373,525 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN SOUTH WEST REGION. ALL CUSTOMERS ROUND ROCK GROWTH DECEMBER 3206 080.70304 2,818,855 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN WEST FORT WORTH REGION. ALL CUSTOMERS FORT WORTH GROWTH DECEMBER 3207 080.70305 1,746,331 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN WEST ARLINGTON REGION. ALL CUSTOMERS ARLINGTON GROWTH DECEMBER 3208 080.70306 691,283 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN WEST REGION. ALL CUSTOMERS ABILENE GROWTH DECEMBER 3209 080.70307 853,716 REPLACE SERVICE LINES IN THE NORTH EAST DISTRICT. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 3210 080.70308 1,216,005 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN NORTH CENTRAL DISTRICT. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER 3211 080.70309 1,846,042 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN NORTH WEST DISTRICT. ALL CUSTOMERS BOYD SYSTEM INTEGRITY DECEMBER 3212 080.70310 359,719 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN SOUTH DALLAS. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 3213 080.70311 889,608 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN SOUTH EAST DISTRICT. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 3214 080.70312 576,280 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN SOUTH WEST DISTRICT. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY DECEMBER 3215 080.70313 897,559 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN WEST FORT WORTH. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 3216 080.70314 1,068,617 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN WEST ARLINGTON IRVING. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 3217 080.70315 481,848 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN WEST DISTRICT. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 3218 080.70316 646,031 NON GROWTH FUNCTIONAL MAINS IN NORTH EAST. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 3219 080.70317 1,131,893 NON GROWTH FUNCTIONAL FOR THE REPLACEMENT OF MAINS IN NORTH CENTRAL REGION. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER 3220 080.70318 1,084,063 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN NORTH WEST REGION. ALL CUSTOMERS BOYD SYSTEM INTEGRITY DECEMBER 3221 080.70319 371,969 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN SOUTH DALLAS. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 3222 080.70320 632,913 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN SOUTH EAST REGION. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 3223 080.70321 392,781 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN SOUTH WEST REGION. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY DECEMBER 3224 080.70322 633,405 NON GROWTH FUNCTIONAL MAINS PROJECT IN WEST FORT WORTH. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER MTX Additions Page 100 of 178 319 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3225 080.70323 640,455 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN WEST ARLINGTON REGION. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 3226 080.70324 663,155 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN WEST REGION. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 3227 080.70325 1,662,461 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN NORTH EAST REGION. ALL CUSTOMERS GARLAND GROWTH DECEMBER 3228 080.70326 1,321,606 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN NORTH CENTRAL REGION. ALL CUSTOMERS MCKINNEY GROWTH DECEMBER 3229 080.70327 2,107,382 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN NORTH WEST REGION. ALL CUSTOMERS BOYD GROWTH DECEMBER 3230 080.70328 773,626 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN SOUTH DALLAS REGION. ALL CUSTOMERS DALLAS GROWTH DECEMBER 3231 080.70329 1,384,673 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN SOUTH EAST REGION. ALL CUSTOMERS WACO GROWTH DECEMBER 3232 080.70330 504,274 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN SOUTH WEST REGION. ALL CUSTOMERS ROUND ROCK GROWTH DECEMBER 3233 080.70331 1,183,227 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN WEST FORT WORTH REGION. ALL CUSTOMERS FORT WORTH GROWTH DECEMBER 3234 080.70332 900,482 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN WEST ARLINGTON REGION. ALL CUSTOMERS ARLINGTON GROWTH DECEMBER 3235 080.70333 1,521,042 NON GROWTH FUNCTIONAL METERS IN WEST DISTRICT. ALL CUSTOMERS ABILENE GROWTH DECEMBER 3236 080.70334 1,167,247 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN NORTH EAST REGION. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 3237 080.70335 421,342 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN NORTH CENTRAL REGION. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER 3238 080.70336 2,319,101 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN NORTH WEST REGION. ALL CUSTOMERS BOYD SYSTEM INTEGRITY DECEMBER 3239 080.70337 8,745,348 NON GROWTH FUNCTIONAL CATHODIC PROTECTION IN SOUTH DALLAS. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 3240 080.70338 1,571,867 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN SOUTH EAST REGION. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 3241 080.70339 465,870 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN SOUTH WEST REGION. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY DECEMBER 3242 080.70340 1,309,290 NON GROWTH FUNCTIONAL CATHODIC PROTECTION IN WEST FORT WORTH. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 3243 080.70341 571,098 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN WEST ARLINGTON REGION. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 3244 080.70342 1,547,412 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN WEST REGION. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 3245 080.70343 7,582 RELOCATE FACILITIES. INSTALL 780 FEET OF 2 INCH POLY AND ABANDON 735 FEET OF 2 INCH STEEL ALONG COLLIER STREET TO ACCOMMODATE THE CITY OF DENTON STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 3246 080.70344 45,909 PERFORM REPAIRS ON LINE D IN DALLAS COUNTY TO REMEDIATE ANOMALIES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER 3247 080.70347 (216) INSTALL 3284 FEET OF 6 INCH AND 3099 FEET OF 2 INCH POLY ALONG THE STREETS OF MORNINGSTAR SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH JANUARY 3248 080.70350 574,232 INSTALL 13,325 FEET OF 4 INCH POLY ALONG MEADOW HAWK DRIVE. RESIDENTIAL ARLINGTON GROWTH SEPTEMBER 3249 080.70355 47,960 RELOCATE FACILITIES. INSTALL 500 FEET OF 6 INCH STEEL ALONG 1101 FRANCIS DRIVE AND ABANDON 500 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF COLLEGE STATION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES OCTOBER 3250 080.70379 14,289 RELOCATE FACILITIES. INSTALL 1100 FEET OF 4 INCH POLY ALONG SKYLINE AND ABANDON 1090 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF ROWLETT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT RELOCATION OF FACILITIES OCTOBER 3251 080.70384 8,317 INSTALL 387 FEET OF 6 INCH POLY AND 220 FEET OF 4 INCH POLY ALONG INTERSTATE 35. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROUND ROCK GROWTH DECEMBER 3252 080.70405 82,368 RELOCATE FACILITIES. INSTALL 2820 FEET OF 8 INCH POLY, 120 FEET OF 4 INCH POLY AND 1700 FEET OF 2 INCH POLY ALONG RIVERSIDE DRIVE TO ACCOMODATE CITY PAVING PROJECT AND ABANDON 800 FEET OF 6 INCH STEEL, 2410 FEET OF 8 INCH STEEL, 10 FEET OF 4 INCH STEEL, 40 FEET OF 4 INCH POLY AND 100 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3253 080.70406 (164,925) INSTALL 6 INCH POLY ALONG ROSEDALE AND FOREST PARK IN FORT WORTH AND ABANDON 12 INCH STEEL TO ACCOMMODATE THIRD PARTY DAMAGE. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY FEBRUARY 3254 080.70409 912 ABANDON 14 FEET OF 2 INCH POLY ALONG 3RD STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 3255 080.70412 12,564 ABANDON 860 FEET OF 4 INCH STEEL AND 35 FEET OF 3 INCH STEEL ALONG HILL STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY OCTOBER 3256 080.70436 12,000 INSTALL 745 FEET OF 4 INCH POLY ALONG S 4TH STREET IN ABILENE TX AND ABANDON 340 FEET OF 6 INCH CAST IRON, 30 FEET OF 6 INCH STEEL, 25 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 3257 080.70437 (69) INSTALL 1,979 FEET OF 8 INCH AND 509 FEET OF 6 INCH POLY ALONG HWY 195. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS GEORGETOWN GROWTH JANUARY 3258 080.70438 2,936 INSTALL 556 FEET OF 6 INCH AND 5730 FEET OF 2 INCH POLY ALONG THE STREETS OF OAK BEND SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JULY 3259 080.70443 (132) INSTALL 2240 FEET OF 6 INCH, 2616 FEET OF 4 INCH, AND 4388 FEET OF 2 INCH POLY ALONG SHELL SPUR ROAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH JANUARY 3260 080.70444 (62,295) RELOCATE FACILITIES. INSTALL 935 FEET OF 20 INCH STEEL AND ABANDON 925 FEET OF 20 INCH STEEL ALONG LA PRADA DRIVE TO ACCOMMODATE TXDOT IMPROVEMENT PROJECT. ALL CUSTOMERS MESQUITE RELOCATION OF FACILITIES DECEMBER 3261 080.70447 42,727 RELOCATE FACILITIES. INSTALL 1600 FEET OF 2 INCH AND 145 FEET OF 6 INCH POLY ALONG CANADA DRIVE AND ABANDON 440 FEET OF 2 INCH AND 720 FEET OF 3 INCH POLY AND 440 FEET OF 3 INCH STEEL AND 145 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES DECEMBER 3262 080.70449 1,780 ABANDON DISTRICT REGULATOR STATION 120 ALONG N. EWING AVENUE IN DALLAS, TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3263 080.70450 670 INSTALL 800 FEET OF 4 INCH POLY ALONG ELM STREET. COMMERCIAL OR INDUSTRIAL KEMP GROWTH JULY 3264 080.70455 35,136 RELOCATE FACILITIES. INSTALL 25 FEET OF 16 INCH STEEL ALONG SAMUELL BOULEVARD AND ABANDON 25 FEET OF 16 INCH STEEL IN ACCORDANCE WITH THE RAILROAD TEXAS OF COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 3265 080.70462 801 INSTALL 905 FEET OF 6 INCH, 750 FEET OF 4 INCH AND 2,030 FEET OF 2 INCH POLY ALONG STREETS OF ESTATES PHASE 2. RESIDENTIAL WAXAHACHIE GROWTH MARCH 3266 080.70470 1,181 ABANDON DISTRICT REGLUATOR STATION 143 AND 161 IN FORT WORTH TEXAS ALONG HEMPHILL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3267 080.70475 2,265 RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH POLY ALONG SW ALSURY BOULEVARD AND ABANDON 40 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF BURLESON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON RELOCATION OF FACILITIES OCTOBER 3268 080.70476 11,327 REPLACE DISTRICT REGULATOR STATION # 04 ON BELL AND SANTA FE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROGERS SYSTEM INTEGRITY OCTOBER 3269 080.70477 5,731 INSTALL DISTRICT REGULATOR STATION 15 ALONG THE STREETS OF AVENUE D AND MITCHELL IN BELTON TX AND ABANDON DISTRICT REGULATOR STATION 15 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY OCTOBER 3270 080.70478 17,317 RELOCATE FACILITIES. INSTALL 350 FEET OF 6 INCH POLY AND ABANDON 250 FEET OF 6 INCH POLY TO ACCOMMODATE CONSTRUCTION ON TELECOM LINE. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES NOVEMBER MTX Additions Page 101 of 178 320 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3271 080.70479 8,465 REPLACE DISTRICT REGULATOR STATION ALONG FANNIN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY OCTOBER 3272 080.70492 84,617 RELOCATE FACILITIES. INSTALL 492 FEET OF 2 INCH POLY ALONG PINYON TREE AND ABANDON 455 FEET OF 2 INCH AND 145 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER 3273 080.70498 4,951 INSTALL 485 FEET OF 2 INCH POLY ALONG HERON AND ABANDON 400 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER 3274 080.70502 11,770 RELOCATE FACILITIES. INSTALL 1150 FEET OF 4 INCH POLY AND ABANDON 1150 FEET OF 3 INCH STEEL ALONG PALASOTA DRIVE TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES OCTOBER 3275 080.70504 18,303 RELOCATE FACILITIES. INSTALL 1275 FEET OF 2 INCH POLY AND 750 FEET OF 4 INCH POLY ALONG SPRUCE STREET AND ABANDON 725 FEET OF 4 INCH STEEL,476 FEET OF 2 INCH STEEL, 70 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF WEST IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST RELOCATION OF FACILITIES OCTOBER 3276 080.70505 4,969 RELOCATE FACILITIES. INSTALL 40 FEET OF 6 INCH POLY AND ABANDON 30 FEET OF 6 INCH POLY ALONG SACHSE ROAD TO ACCOMMODATE THE CITY OF SACHSE IN BROWNWOOD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SACHSE RELOCATION OF FACILITIES OCTOBER 3277 080.70511 3,295 REPLACE BONHAM DRS 24 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY OCTOBER 3278 080.70512 5,924 REPLACE ECTOR DRS 02 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ECTOR SYSTEM INTEGRITY OCTOBER 3279 080.70515 37,673 RELOCATE FACILITIES. INSTALL 2200 FEET OF 4 INCH POLY AND 900 FEET OF 2 INCH POLY ALONG CLAYTON ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3280 080.70520 (25) INSTALL 2400 FEET OF 2 INCH POLY ALONG STREETS OF SPRINGS ESTATES. RESIDENTIAL KELLER GROWTH MARCH 3281 080.70522 6,344 RELOCATE FACILITIES. INSTALL 750 FEET OF 4 INCH POLY ALONG BAILEY BOSWELL ROAD AND ABANDON 700 FEET OF 4 INCH POLY TO ACCOMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW RELOCATION OF FACILITIES OCTOBER 3282 080.70523 16,053 INSTALL 1210 FEET OF 2 INCH POLY AND 1 DISTRICT REGLUATOR STATION AND ABANDON 1059 FEET OF 2 INCH STEEL AND 1 DISTRICT REGLUATOR STATION ALONG PURDUE AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY OCTOBER 3283 080.70524 13,797 REPLACE DISTRICT REGULATOR STATION 016 AND INSTALL 1300 FEET OF 2 INCH POLY AND ABANDON 1274 FEET OF 2 INCH STEEL ALONG POMONA AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY OCTOBER 3284 080.70526 2,997 INSTALL DISTRICT REGULATOR STATION 06 ALONG ALONG 2ND STREET AND DISTRICT REGULATOR STATION 06 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY OCTOBER 3285 080.70527 3,224 INSTALL DISTRICT REGULATOR STATION 12 ALONG STARR STREET AND ABANDON DISTRICT REGULATOR STATION 12 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY OCTOBER 3286 080.70528 9,205 INSTALL 60 FEET OF 2 INCH POLY AND NEW DISTRICT REGLUATOR STATION ALONG SHIRES STREET AND ABANDON DISTRICT REGLUATOR STATION, 60 FEET OF 2 INCH POLY AND 35 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNICORPORATED COUNTY AREA, (GOODLET) SYSTEM INTEGRITY OCTOBER 3287 080.70529 3,314 INSTALL 715 FEET OF 2 INCH POLY ALONG BILL STREET AND ABANDON S203 DRS, 60 FEET OF 2 INCH POLY AND 60 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNICORPORATED COUNTY AREA, (GOODLET) SYSTEM INTEGRITY OCTOBER 3288 080.70530 14,860 INSTALL DISTRICT REGULATOR STATION 01, 10 FEET OF 3 INCH POLY AND 10 FEET OF 4 INCH POLY ALONG CHURCH STREET AND ABANDON DISTRICT REGULATOR STATION 01, 4 FEET OF 3 INCH POLY AND 10 FEET OF 4 INCH STEELIN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE SYSTEM INTEGRITY OCTOBER 3289 080.70531 4,298 INSTALL DISTRICT REGULATOR STATION 02, 30 FEET OF 3 INCH POLY AND 30 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 02 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY OCTOBER 3290 080.70532 8,948 INSTALL 30 FEET OF 2 INCH POLY, 45 FEET OF 4 INCH POLY, DISTRICT REGULATOR STATION 07 ALONG DALLAS STREET AND ABANDON 10 FEET OF 2 INCH STEEL, 10 FEET OF 4 INCH STEEL, DISTIRCT REGULATOR STATION 07 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY OCTOBER 3291 080.70533 7,861 REPLACE CHILDRESS DISTRICT REGLUATOR STATION 07 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER 3292 080.70534 8,381 INSTALL 50 FEET OF 2 INCH POLY, 120 FEET OF 4 INCH POLY, 175 FEET OF 6 INCH POLY, DISTRICT REGULATOR STATION 08 ALONG 4TH STREET NE AND ABANDON 230 FEET OF 8 INCH STEEL, 25 FEET OF 6 INCH STEEL, 10 FEET OF 4 INCH STEEL, AND 80 FEET OF 3 INCH POLY, DISTRICT REGULATOR STATION 08 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER 3293 080.70535 7,113 INSTALL 80 FEET OF 2 INCH AND 30 FEET OF 4 INCH POLY AND NEW DISTRICT REGULATOR STATION 14 ALONG SOUTH MAIN STREET AND ABANDON DISTRICT REGULATOR STATION, 60 FEET OF 2 INCH POLY AND 45 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER 3294 080.70536 6,206 INSTALL 80 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION 15 ALONG 9TH STREET AND ABANDON 5 FEET OF 3 INCH POLY AND 20 FEET OF 2 INCH AND 5 FEET OF 3 INCH STEEL AND S203 DISTRICT REGULATOR STATION 15 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER 3295 080.70537 11,126 INSTALL 100 FEET OF 2 INCH POLY AND 100 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION 17 ALONG NE 6TH STREET AND ABANDON DISTRICT REGULATOR STATION 17, 10 FEET OF 2 INCH POLY AND 30 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER 3296 080.70538 20,614 INSTALL 1800 FEET OF 2 INCH POLY ALONG 10TH STREET AND ABANDON 1790 FEET OF LOW PRESSURE STEEL AND DISTRICT REGULATOR STATION 18 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER 3297 080.70539 10,950 INSTALL 75 FEET OF 4 INCH AND 30 FEET OF 2 INCH POLY AND NEW DISTRICT REGULATOR STATION 20 ALONG SOUTH EAST 9TH ST AND ABANDON DISTRICT REGLUATOR STATION AND 70 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER 3298 080.70540 18,007 INSTALL 40 FEET OF 4 INCH, 30 FEET OF 3 INCH AND 100 FEET OF 6 INCH POLY, DISTRICT REGULATOR STATION 08 ALONG MORTON STREET AND ABANDON DISTRICT REGULATOR STATION 08 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY DECEMBER 3299 080.70541 52,103 INSTALL 910 FEET OF 2 INCH POLY AND ABANDON 747 FEET OF 2 INCH STEEL AND DRS 09 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY DECEMBER 3300 080.70542 3,955 REPLACE DENISON DRS 11 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER 3301 080.70543 5,523 REPLACE DENISON DRS39 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER 3302 080.70544 6,224 INSTALL 235 FEET OF 2 INCH POLY, 25 FEET OF 4 INCH POLY, DISTRICT REGULATOR STATION 01 ALONG PINE STREET AND CHAPMAN STREET AND ABANDON 250 FEET OF 4 INCH STEEL, 10 FEET OF 3 INCH STEEL, DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITEWRIGHT SYSTEM INTEGRITY OCTOBER MTX Additions Page 102 of 178 321 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3303 080.70545 5,267 INSTALL 60 FEET OF 2 INCH POLY, 80 FEET OF 4 INCH POLY, DISTRICT REGULATOR STATION 03 ALONG GARDNER STREET AND ABANDON 222 FEET OF 3 INCH STEEL, 10 FEET OF 2 INCH STEEL, DISTRICT REGULATOR STATION 03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITEWRIGHT SYSTEM INTEGRITY OCTOBER 3304 080.70546 219,308 INSTALL 175 FEET OF 4 INCH, 20 FEET OF 3 INCH, AND 1900 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 05, 120 FEET OF 4 INCH AND 2821 FEET OF 3 INCH STEEL ALONG LOCUST STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITEWRIGHT SYSTEM INTEGRITY OCTOBER 3305 080.70547 4,311 INSTALL DISTRICT REGULATOR STATION 01 ALONG TRAVIS STREET AND MAIN STREET AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEONARD SYSTEM INTEGRITY OCTOBER 3306 080.70548 109,311 INSTALL 2900 FEET OF 2 INCH AND 225 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 02, 700 FEET OF 4 INCH, 2512 FEET OF 3 INCH, AND 44 FEET OF 2 INCH STEEL AND 2 FEET OF 2 INCH AND 100 FEET OF 1.25 INCH POLY ALONG THE STREETS OF LEONARD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEONARD SYSTEM INTEGRITY OCTOBER 3307 080.70549 5,018 INSTALL 85 FEET OF 2 INCH POLY, 45 FEET OF 4 INCH POLY, DISTRICT REGULATOR STATION 03 ALONG PARMELE STREET AND THOMAS STREET AND ABANDON 135 FEET OF 4 INCH STEEL, DISTRICT REGULATOR STATION 03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEONARD SYSTEM INTEGRITY OCTOBER 3308 080.70551 33,364 INSTALL 2300 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 05, 683 FEET OF 4 INCH, 2469 FEET OF 3 INCH, AND 301 FEET OF 2 INCH STEEL AND 520 FEET OF POLY ALONG THE STREETS OF LEONARD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEONARD SYSTEM INTEGRITY OCTOBER 3309 080.70552 3,960 INSTALL DISTRICT REGULATOR STATION 01 ALONG GRIMES STREET AND BALLENTINE STREET AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY OCTOBER 3310 080.70553 8,913 INSTALL 400 FEET OF 4 INCH POLY, 25 FEET OF 2 INCH POLY, DISTRICT REGULATOR STATION 04 ALONG AUGUSTUS STREET AND ABANDON 433 FEET OF 2 INCH STEEL, DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY DECEMBER 3311 080.70554 12,365 INSTALL 920 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY ALONG SAUNDERS AND DISTRICT REGULATOR STATION ON 4TH AND ABANDON 335 FEET OF 3 INCH STEEL AND DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY OCTOBER 3312 080.70555 15,688 INSTALL 225 FEET OF 4 INCH POLY AND 2970 FEET OF 2 INCH POLY AND ABANDON 1,898 FEET OF 3 INCH STEEL, 553 FEET OF 4 INCH STEEL, 171 FEET OF 3 INCH POLY, 167 FEET OF 2 INCH POLY, 219 FEET OF 2 INCH STEEL ALONG NW FRONT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAVOY SYSTEM INTEGRITY OCTOBER 3313 080.70557 14,186 RELOCATE FACILITIES. INSTALL 750 FEET OF 2 INCH POLY ALONG CEDAR DRIVE AND ABANDON 750 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF IRVING IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 3314 080.70564 32,874 RELOCATE FACILITIES. INSTALL 24 FEET OF 2 INCH POLY, 288 FEET OF 4 INCH POLY AND 1009 FEET OF 6 INCH POLY ALONG HARWOOD ROAD AND ABANDON 14 FEET OF 2 INCH STEEL, 93 FEET OF 3 INCH STEEL, 88 FEET OF 4 INCH STEEL AND 990 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF EULESS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS RELOCATION OF FACILITIES DECEMBER 3315 080.70566 27,747 INSTALL 1610 FEET OF 4 INCH POLY AND 635 FEET OF 2 INCH POLY AND ABANDON 1,497 FT OF 3 INCH STEEL, 826 FEET OF 4 INCH STEEL, 130 FEET OF 4 INCH DUPONT, 154 FEET OF 4 INCH POLY, 140 FEET OF 4 INCH STEEL, AND 292 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEONARD SYSTEM INTEGRITY OCTOBER 3316 080.70575 12,336 INSTALL 2 INCH POLY SERVICE LINE ALONG AVONDALE HASLET ROAD. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH JANUARY 3317 080.70576 (123,592) INSTALL 3430 FEET OF 8 INCH POLY ALONG RONALD REAGAN. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS GEORGETOWN GROWTH APRIL 3318 080.70577 452 INSTALL 2510 FEET OF 2 INCH POLY ALONG THE STREETS OF MEADOW RUN SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH MARCH 3319 080.70583 1,074 INSTALL 800 FEET OF 6 INCH, 1435 FEET OF 4 INCH AND 6150 FEET OF 2 INCH POLY ALONG STREETS OF ENCLAVE PHASE 1 & 2. RESIDENTIAL WAXAHACHIE GROWTH JULY 3320 080.70585 679 INSTALL 4800 FEET OF 2 INCH AND 3490 FEET OF 4 INCH POLY ALONG THE STREETS OF WOLF CREEK FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH JUNE 3321 080.70590 (96,432) RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY AND 780 FEET OF 2" POLY AND ABANDON 700 FEET OF 4 POLY TO ACCOMMODATE THE CONSTRUCTION OF SMU RESIDENTIAL. ALL CUSTOMERS UNIVERSITY PARK RELOCATION OF FACILITIES APRIL 3322 080.70594 214 INSTALL 3500 FEET OF 6 INCH POLY ALONG HERITAGE TOWNE SUBDIVISION. ALL CUSTOMERS GRAND PRAIRIE GROWTH DECEMBER 3323 080.70595 1,242,515 INSTALL DISTRICT REGULATOR STATION, 2800 FEET OF 6 INCH POLY AND 430 FEET OF 4 INCH STEL ALONG THE STREETS OF WYLIE. ALL CUSTOMERS WYLIE SYSTEM IMPROVEMENT DECEMBER 3324 080.70596 37,539 INSTALL 1,465 FEET OF 4 INCH AND 4,150 FEET OF 2 INCH POLY ALONG THE STREETS OF HERITAGE TOWNE SUBDIVISION IN GRAND PRAIRIE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GRAND PRAIRIE GROWTH DECEMBER 3325 080.70597 1,059 INSTALL 208 FEET OF 6 INCH, 3231 FEET OF 4 INCH, AND 2133 FEET OF 2 INCH POLY ALONG THE STREETS OF PRIMROSE CROSSING SUBDIVISION. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER 3326 080.70598 152 INSTALL 1,426 FEET OF 2 INCH AND 2,868 FEET OF 4 INCH POLY ALONG STREETS OF PRIMROSE PHASE 7. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER 3327 080.70599 32,357 INSTALL 1,100 FEET OF 6 INCH POLY 2,600 FEET OF 2 INCH POLY ALONG BRITTON ROAD AND NOAH STREET AND ABANDON 4,587 FEET OF 6 INCH POLY, 370 FEET OF 6 INCH STEEL, 1,400 FEET OF 3 INCH STEEL, AND AND DISTRICT REGULATOR STATION 01 AND 08 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY OCTOBER 3328 080.70603 183,703 INSTALL 3,294 FEET OF 4 INCH AND 630 FEET OF 2 INCH POLY ALONG THE STREETS OF PRIMROSE CROSSING SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER 3329 080.70605 185,794 INSTALL 2570 FEET OF 4 INCH AND 4100 FEET OF 2 INCH POLY ALONG THE STREETS OF THE VIEW AT THE RESERVES. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANSFIELD GROWTH OCTOBER 3330 080.70606 21,459 RELOCATE FACILITIES. INSTALL 114 FEET OF 4 INCH POLY ALONG NORTH BELL AVENUE AND ABANDON 475 FEET OF 4 INCH STEEL, 20 FEET OF 3 INCH POLY AND 760 FEET OF 2 INCH POLY TO ACCOMODATE CITY OF DENTON UTILITY AND STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 3331 080.70608 9,759 INSTALL 640 FEET OF 2 INCH POLY AND ABANDON 625 FEET OF 2 INCH STEEL ALONG ROGERS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY OCTOBER 3332 080.70610 10,024 INSTALL DISTRICT REGULATOR STATION 07, 340 FEET OF 6 INCH POLY ALONG BURNETT STREET AND ABANDON DISTRICT REGULATOR STATION 07, 11 FEET OF 4 INCH STEEL, 61 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3333 080.70611 188,849 INSTALL DISTRICT REGULATOR STATION #8 AND 460 FEET OF 4 INCH AND 240 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION #8 AND 41 FEET OF 4 INCH STEEL AND 24 FEET OF 4 INCH, 132 FEET OF 6 INCH POLY ALONG BAYLOR STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 3334 080.70612 12,194 INSTALL 230 FEET OF 2 INCH AND 120 FEET OF 4 INCH POLY ALONG LAFAYETTE ST AND ABANDON 10 FEET OF 2 INCH STEEL AND 370 FEET OF 4 INCH POLY AND REPLACE WICHITA FALLS DRS013 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3335 080.70614 7,024 INSTALL 170 FEET OF 2 INCH AND 70 FEET OF 4 INCH POLY ALONG REDWOOD AVENUE AND ABANDON 10 FEET OF 2 INCH AND 40 FEET OF 4 INCH STEEL AND REPLACE WICHITA FALLS DRS043 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER MTX Additions Page 103 of 178 322 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3336 080.70615 6,903 INSTALL 50 FEET OF 4 INCH AND 60 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION 045 ALONG GRANT STREET AND ABANDON 10 FEET OF 3 INCH STEEL AND 10 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION 045 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3337 080.70616 5,594 INSTALL 70 FEET OF 4 INCH AND 90 FEET OF 2 INCH POLY ALONG BLUFF ST AND ABANDON 5 FEET OF 4 INCH STEEL AND 95 FEET OF 2 INCH POLY AND REPLACE WICHITA FALLS DRS046 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3338 080.70617 9,014 INSTALL 450 FEET OF 2 INCH AND 70 FEET OF 4 INCH POLY ALONG BLUFF ST AND ABANDON 10 FEET OF 4 INCH, 10 FEET OF 3 INCH, AND 10 FEET OF 2 INCH STEEL AND REPLACE WICHITA FALLS DRS062 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3339 080.70618 169,666 INSTALL DISTRICT REGULATOR STATION #66 AND 30 FEET OF 6 INCH POLY AND 250 FEET OF 6 INCH POLY AND ABANDON DISTRICT REGULATION STATION #66 AND 97 FEET OF 6 INCH POLY ALONG STREET OF WICHITA FALLS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY APRIL 3340 080.70619 136,363 INSTALL DISTRICT REGULATOR STATION #67 AND INSTALL 4 INCH POLY ALONG FILLMORE STREET AND ABANDON DISTRICT REGULATOR STATION FISHER #S203&NBSP; AND 19 FEET OF 2 INCH STEEL AND 188 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY JUNE 3341 080.70620 211,941 INSTALL DISTRICT REGULATOR STATION #83 AND 425 FEET OF 4 INCH, 130 FEET OF 6 INCH POLY AND ABANDON DISTRICT REGULATOR STATION #83, 248 FEET OF 6 INCH STEEL AND 3 FEET OF 6 INCH POLY ALONG SANTA FE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 3342 080.70625 13,342 INSTALL 2 INCH POLY SERVICE LINE ALONG AIRPORT FREEWAY. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH JANUARY 3343 080.70633 2,857 RELOCATE FACILITIES. INSTALL 250 FEET OF 2 INCH POLY ALONG BATES AND ELM AND ABANDON 418 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF STEPHENVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE RELOCATION OF FACILITIES OCTOBER 3344 080.70636 8,201 INSTALL 1280 FEET OF 2 INCH POLY ALONG PASADENA STREET AND ABANDON 1118 FEET OF 2 INCH STEEL, 120 FEET OF 2 INCH POLY, 6 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION 02 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.029. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY OCTOBER 3345 080.70638 11,919 INSTALL 1,425 FEET OF 2 INCH POLY ALONG PENN STREET AND ABANDON 1,495 FEET OF 2 INCH STEEL, 5 FEET OF 2 INCH POLY, 22 FEET OF 3 INCH STEEL, 5 FEET OF 6 INCH STEEL AND DISTRICT REGULATOR STATION 03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY OCTOBER 3346 080.70639 17,176 INSTALL 2050 FEET OF 2 INCH POLY AND ABANDON 2343 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY OCTOBER 3347 080.70643 202,483 INSTALL DISTRICT REGULATOR STATION # 17, 30 FEET OF 2 INCH, 225 FEET OF 6 INCH POLY AND ABANDON DISTRICT REGULATOR STATION #17, 64 FEET OF 2 INCH STEEL AND 139 FEET OF 4 INCH STEEL ALONG FULTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER 3348 080.70644 28,087 INSTALL 2777 FEET OF 2 INCH POLY ALONG BRADSHAW STREET AND ABANDON DISTRICT REGULATOR STATION 28, 1436 FEET OF 3 INCH POLY AND 1269 OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER 3349 080.70650 21,644 RELOCATE FACILITIES. INSTALL 1800 FEET OF 2 INCH POLY ALONG AUSTIN AND OAK AND ABANDON 482 FEET OF 2 INCH POLY AND 1310 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF DELEON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DELEON RELOCATION OF FACILITIES OCTOBER 3350 080.70655 13,431 INSTALL 510 FEET OF 4 INCH POLY ALONG THE STREETS OF RAYZOR RANCH SENIOR LIVING CENTER. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL DENTON GROWTH SEPTEMBER 3351 080.70664 508 INSTALL 1,775 FEET OF 2 INCH POLY, 2,070 FEET OF 4 INCH POLY AND 305 FEET OF 6 INCH POLY ALONG THE STREETS OF HARVEST SUBDIVISION IN NORTHLAKE, TX. RESIDENTIAL NORTHLAKE GROWTH MARCH 3352 080.70678 11,631 RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH POLY ALONG LEONARD STREET AND WALTERS STREET AND ABANDON 2725 FEET OF 2 INCH STEEL TO ACCOMODATE CITY OF LEWISVILLE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE RELOCATION OF FACILITIES OCTOBER 3353 080.70681 242,142 INSTALL 2,036 FEET OF 4 INCH POLY ALONG THE STREET OF AUBREY RETAIL COMMERCIAL. COMMERCIAL OR INDUSTRIAL AUBREY GROWTH SEPTEMBER 3354 080.70683 29,081 INSTALL 3,885 FEET OF 2 INCH AND 1,940 FEET OF 6 INCH POLY ALONG THE STREETS OF CAMBRIDGE BROOK SUBDIVISION IN DENTON COUNTY. RESIDENTIAL DENTON GROWTH DECEMBER 3355 080.70686 719,017 RELOCATE FACILITIES. INSTALL 335 FEET OF 4 INCH AND 4356 OF 2 INCH POLY AND ABANDON 2090 FEET OF 2 INCH AND 1252 FEET OF 3 INCH STEEL, 263 FEET OF 2 INCH, 699 FEET OF 3 INCH AND 128 FEET OF 4 INCH POLY ALONG THE STREETS OF KELLER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY OCTOBER 3356 080.70688 180,119 INSTALL 4,845 FEET OF 2 INCH POLY ALONG THE STREETS OF GLENWOOD MEADOWS SUBDIVISION IN DENTON. RESIDENTIAL DENTON GROWTH OCTOBER 3357 080.70691 1,309 RELOCATE FACILITIIES. INSTALL SIX 0.75 INCH POLY SERVICE LINES ALONG ANCHOR DRIVE AND ABANDON SIX 0.75 INCH POLY SERVICE LINES TO ACCOMMODATE THE CITY OF PLANO ALLEY PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES OCTOBER 3358 080.70693 15,777 RELOCATE FACILITIES. INSTALL 1240 FEET OF 2 INCH POLY AND ABANDON 1240 FEET OF 4 INCH STEEL ALONG MIMS STREET TO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3359 080.70702 28,068 RELOCATE FACILITIES. INSTALL 2300 FEET OF 4 INCH POLY ALONG STREETS OF DALLAS AND ABANDON 2200 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 3360 080.70706 7,332 ABANDON 276 FEET OF 2 INCH STEEL, 847 FEET OF 2 INCH POLY, 521 FEET OF 1.25 INCH POLY, 302 FEET OF 1 INCH STEEL, 197 FEET OF 1.25 STEEL, 20 FEET OF 2 INCH STEEL, 27 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION 05 ALONG WINKLER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORMAN SYSTEM INTEGRITY OCTOBER 3361 080.70708 2,285 ABANDON DISTRICT REGULATOR STATION 05 AND DISTRICT REGULATOR STATION 03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HICO SYSTEM INTEGRITY OCTOBER 3362 080.70711 1,124 INSTALL 1462 FEET OF 4 INCH POLY AND 660 FEET OF 6 INCH POLY ALONG CHITALPA STREET. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LEANDER GROWTH JUNE 3363 080.70712 7,337 INSTALL 5 FEET OF 10 INCH STEEL AND 268 FEET OF 2 INCH POLY AND ABANDON 3 FEET OF 10 INCH STEEL AND 280 FEET OF 4 INCH POLY ALONG ALONG WILLIAM A TAYLOR IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 3364 080.70722 268 INSTALL 5500 FEET OF 2 INCH POLY ALONG THE STREETS OF DEVONSHIRE VILLAGE PHASE 7. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH JULY 3365 080.70723 3,364 RELOCATE FACILITIES. INSTALL 45 FEET OF 2 INCH POLY AND ABANDON 32 FEET OF 2 INCH STEEL ALONG CITADEL AND CHATEAU IN ACCORDANCE WITH THE RAILAROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 3366 080.70725 550 INSTALL 5187 FEET OF 2 INCH POLY ALONG THE STREETS OF PANCHASARP FARMS SUBDIVISON. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BURLESON GROWTH APRIL 3367 080.70734 22,434 RELOCATE FACILTIES. INSTALL 1340 FEET OF 4 INCH POLY AND ABANDON 1340 FEET OF 4 INCH STEEL ALONG WESSEX AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER MTX Additions Page 104 of 178 323 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3368 080.70735 25,666 RELOCATE FACILITIES. INSTALL 1400 FEET OF 4 INCH POLY, 50 FEET OF 6 INCH POLY, 90 FEET OF 8 INCH POLY AND ABANDON 1400 FEET OF 4 INCH STEEL, 50 FEET OF 6 INCH STEEL, AND 90 FEET OF 8 STEEL ALONG OVERTON PARK TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3369 080.70739 14,290 RELOCATE FACILITIES. INSTALL 1000 FEET OF 4 INCH POLY AND ABANDON 930 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3370 080.70741 2,393 INSTALL 1360 FEET OF 2 INCH POLY ALONG EMERALD PARKWAY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH SEPTEMBER 3371 080.70744 1,228 INSTALL 8170 FEET OF 2 INCH POLY ALONG THE STREETS OF WILDCAT SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH MARCH 3372 080.70746 45,451 RELOCATE FACILITIES. INSTALL 50 FEET OF 8 INCH, 250 FEET OF 6 INCH AND 105 FEET OF 4 INCH POLY ALONG MIDWAY ROAD AND ABANDON 40 FEET OF 8 INCH STEEL 250 FEET OF 6 INCH AND 115 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF ADDISON STREET PROJECT. ALL CUSTOMERS ADDISON RELOCATION OF FACILITIES OCTOBER 3373 080.70750 22,730 RELOCATE FACILITIES. INSTALL 1600 FEET OF 4 INCH POLY ALONG FM 696 AND ABANDON 1600 FEET OF 2 INCH POLY TO ACCOMMODATE TXDOT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEXINGTON RELOCATION OF FACILITIES OCTOBER 3374 080.70768 363 INSTALL 430 FEET OF 2 INCH, 1130 FEET OF 4 INCH, AND 580 FEET OF 6 INCH POLY ALONG ROCK PRAIRIE ROAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH MARCH 3375 080.70787 4,041 RELOCATE FACILITIES. INSTALL 50 FEET OF 4 INCH POLY ALONG CARUTH PARK AND ABANDON 24 FEET OF POLY TO ACCOMMODATE THE CITY OF UNIVERSITY PARK IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK RELOCATION OF FACILITIES OCTOBER 3376 080.70790 561 INSTALL 3226 FEET OF 4 INCH AND 2036 FEET OF 2INCH POLY ALONG THE STREETS OF VENTANA SUBDIVISION. RESIDENTIAL FORT WORTH GROWTH MARCH 3377 080.70797 5,865 INSTALL DISTRICT REGLUATOR STATION 01 ALONG 23RD STREET AND COLLEGE AVENUE AND ABANDON DISTRICT REGLUATOR STATION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER 3378 080.70798 3,828 REPLACE DISTRICT REGULATOR STATION 409 IN FORT WORTH AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3379 080.70799 5 INSTALL 1130 FEET OF 4 INCH POLY AND 1800 FEET OF 2 INCH POLY ALONG THE STREETS OF DOUBLE EAGLE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ABILENE GROWTH JANUARY 3380 080.70806 11,805 INSTALL 750 FT OF 2 INCH POLY ABANDON 740 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY OCTOBER 3381 080.70809 3,304 RELOCATE FACILITIES. INSTALL 60 FEET OF 6 INCH POLY ALONG NOLAN RIVER ROAD AND ABANDON 50 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF CLEBURNE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE RELOCATION OF FACILITIES OCTOBER 3382 080.70810 23,113 RELOCATE FACILITIES. INSTALL 4,287 FEET OF 2 INCH POLY AND ABANDON 4,398 FEET OF 2 INCH POLY ALONG FM4 IN CLEBURNE DUE TO ACCOMOCATE TXDOT HIGHWAY IMPROVEMENTS AND STORM DRAIN EXTENSION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE RELOCATION OF FACILITIES OCTOBER 3383 080.70816 3,704 RELOCATE FACILITIES. INSTALL 260 FEET OF 2 INCH POLY ALONG NORTH ANNA DRIVE AND ABANDON 395 FEET OF 2 INCH STEEL AND 40 FEET OF 4 INCH POLY TO ACCOMODATE THE CITY OF ALLEN PAVING IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN RELOCATION OF FACILITIES OCTOBER 3384 080.70817 4 INSTALL 4200 FEET OF 6 INCH POLY ALONG CASTLE DRIVE DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROWLETT GROWTH JANUARY 3385 080.70822 95,266 INSTALL 7 CLOCKSPRING ALONG LINE CA (2ND)(EAST) IN TARRANT COUNTY TO REMEDIATE ANOMALIES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3386 080.70824 5,844 INSTALL 100 FEET OF 2 INCH POLY ALONG US BUSINESS 81 AND ABANDON 485 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY OCTOBER 3387 080.70831 14,417 INSTALL 3 CLOCKSPRINGS ALONG LINE D IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 3388 080.70835 32,987 INSTALL 2,600 FEET OF 2 INCH POLY AND ABANDON 2,585 FEET OF 2 INCH STEEL ALONG SAN ANTONIO STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 3389 080.70837 9,266 INSTALL 1736 FEET OF 8 INCH, 2496 FEET OF 6 INCH, 722 FEET OF 4 INCH AND 308 FEET OF 2 INCH POLY ALONG THE STREETS OF HORIZON LAKE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LEANDER GROWTH JUNE 3390 080.70840 33,514 RELOCATE FACILITIES. INSTALL 15 FEET OF 2 INCH AND 610 FEET OF 8 INCH POLY ALONG LIVE OAK AND ABANDON 625 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES DECEMBER 3391 080.70842 8,923 RELOCATE FACILITIES. INSTALL 535 FEET OF 2 INCH POLY ALONG MCCLAIN STREET AND ABANDON 525 FEET OF 1.25 INCH STEEL AND 112 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF PRINCETON STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PRINCETON RELOCATION OF FACILITIES OCTOBER 3392 080.70843 11,944 INSTALL 500 FEET OF 6 INCH POLY AND 100 FEET OF 4 INCH POLY AND ABANDON 495 FEET OF 6 INCH POLY AND 95 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SACHSE SYSTEM INTEGRITY OCTOBER 3393 080.70848 (92) INSTALL 3310 FEET OF 2 INCH AND 1730 FEET OF 4 INCH POLY ALONG THE STREETS OF SOUTH OAK SUBDIVISION. RESIDENTIAL LITTLE ELM GROWTH MARCH 3394 080.70849 7,867 INSTALL 10 FEET OF 16 INCH STEEL AND ABANDON 10 FEET OF 16 INCH STEEL ALONG PIPELINE ROAD AND EULESS IN EULESS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY OCTOBER 3395 080.70850 156 INSTALL 1,400 FEET OF 4 INCH POLY TO SERVE ATWOODS COMMERCIAL. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL CROSS ROADS GROWTH JULY 3396 080.70857 27,006 RELOCATE FACILITIES. INSTALL 709 FEET OF 2 INCH POLY AND 822 FEET OF 4 INCH POLY AND ABANDON 694 FEET OF 2 INCH STEEL AND 785 FEET OF 3 INCH STEEL ALONG RUSK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROANOKE RELOCATION OF FACILITIES OCTOBER 3397 080.70859 5,016 RELOCATE FACILITIES. INSTALL 95 FEET OF 6 INCH POLY ALONG HOLLIDAY CREEK AND ABANDON 95 FEET OF 6 INCH STEEL TO ACCOMMODATE TXDOT BRIDGE WIDENING PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES OCTOBER 3398 080.70868 7,883 INSTALL 1000 FEET OF 2 INCH POLY ALONG PARK PLACE AND ABANDON 1000 FEET OF 2 INCH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY OCTOBER 3399 080.70873 6,948 INSTALL 420 FEET OF 4 INCH POLY ALONG W ROBERTS STREET AND ABANDON 392 FEET OF 4 INCH STEEL AND 28 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORMAN SYSTEM INTEGRITY OCTOBER 3400 080.70875 6,141 RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY ALONG LAZY LANE DRIVE AND ABANDON 400 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES OCTOBER 3401 080.70876 71,294 INSTALL 2200 FEET OF 4 INCH AND 3300 FEET OF 2 INCH POLY ALONG THE NEW MITCHELL FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANSFIELD GROWTH JUNE 3402 080.70884 7,575 REPLACE 24 HIGH PRESSURE AND LOW PRESSURE REGULATORS OFF OF FARM TAPS ALONG S2 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER 3403 080.70892 3,457 INSTALL 220 FEET OF 2 INCH POLY ALONG 32ND AVENUE AND ABANDON 400 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 3404 080.70894 23,070 RELOCATE FACILITIES. INSTALL 5803 FEET OF 16 INCH STEEL LINE 01-1 AND ABANDON 4083 FEET OF 6 INCH STEEL TO ACCOMMODATE PRIVATE DEVELOPMENT PROJECT. ALL CUSTOMERS LANCASTER RELOCATION OF FACILITIES DECEMBER MTX Additions Page 105 of 178 324 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3405 080.70897 26,916 RELOCATE FACILITIES. INSTALL 1512 FEET OF 6 INCH POLY ALONG NORTH JOE WILSON ROAD AND ABANDON 1346 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL RELOCATION OF FACILITIES OCTOBER 3406 080.70899 26,572 RELOCATE FACILITIES. INSTALL 1650 FEET OF 2 INCH POLY AND ABANDON 1650 FEET OF 2 INCH STEEL ALONG MELODY LANE TO ACCOMMODATE CITY PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3407 080.70903 8,119 INSTALL DISTRICT REGULATOR STATION 013 ALONG HOWARD STREET AND ABANDON DISTRICT REGULATOR STATION 013 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3408 080.70907 857 INSTALL 3395 FEET OF 4 INCH AND 150 FEET F 2 INCH POLY ALONG STREETS OF ROLLING MEADOWS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LANCASTER GROWTH SEPTEMBER 3409 080.70914 340,979 INSTALL 2,600 FEET OF 6 INCH AND 3,725 FEET OF 2 INCH POLY ALONG THE STREETS OF PARKSIDE NORTH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MIDLOTHIAN GROWTH SEPTEMBER 3410 080.70923 10,714 INSTALL AND REPLACE 1 DISTRICT REGULATOR STATION IN FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 3411 080.70926 4,975 INSTALL AND REPLACE 1 DISTRICT REGULATOR STATION IN FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3412 080.70927 87,231 ABANDON DISTRICT REGULATOR STATION 105 IN FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3413 080.70935 65,754 INSTALL WELD OVER SLEEVE ALONG LINE D AT 635 AND DENTON DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3414 080.70936 11,279 RELOCATE FACILITIES. INSTALL 700 FEET OF 6 INCH POLY AND 132 FEET OF 12 INCH POLY AND 70 FEET OF 2 INCH POLY AND ABANDON 639 FEET OF 6 INCH POLY AND 80 FEET OF 12 INCH STEEL ALONG OAK GROVE ROAD TO ACCOMMODATE THE CITY OF FORT WORTH DRAINGE PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3415 080.70938 337,885 INSTALL 3.6 MILES OF 16 INCH STEEL AND ABANDON 3.8 MILES OF 10 INCH STEEL ALONG D17-4. ALL CUSTOMERS WYLIE SYSTEM IMPROVEMENT DECEMBER 3416 080.70949 18,703 RELOCATE FACILITIES. INSTALL 1800 FEET OF 2 INCH POLY ALONG A.W. PERRY STREET AND ABANDON 1350 FEET OF 2 INCH POLY AND 450 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF CARROLLTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON RELOCATION OF FACILITIES OCTOBER 3417 080.70962 25,774 INSTALL 1400 FEET OF 2 INCH POLY ALONG HOLLEMAN DRIVE AND WELLBORN ROAD AND ABANDON 1400 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 3418 080.70979 30,997 RELOCATE FACILITIES. INSTALL 1100 FEET OF 6 INCH POLY AND ABANDON 1100 FEET OF 6 INCH POLY ALONG RIVERSIDE DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3419 080.70981 3 RELOCATE FACILITIES. INSTALL 560 FEET OF 4 INCH POLY AND ABANDON 207 FEET OF 2 INCH STEEL AND 445 FEET OF 4 INCH STEEL ALONG HALF MOON. ALL CUSTOMERS RUNAWAY BAY RELOCATION OF FACILITIES JANUARY 3420 080.70984 25,400 RELOCATE FACILITIES. INSTALL 850 FEET OF 8 INCH POLY, 30 FEET OF 6 INCH POLY, AND 40 FEET OF 12 INCH POLY ALONG HARMON ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3421 080.70996 229,880 INSTALL 3,590 FEET OF 2 INCH AND 910 FEET OF 6 INCH POLY ALONG THE STREET OF LEGACY RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH DECEMBER 3422 080.70998 22,958 RELOCATE FACILITIES. INSTALL 628 FEET OF 2 INCH POLY ALONG US-175 AND ABANDON 628 FEET OF 2 INCH POLY TO ACCOMMODATE A TXDOT ROAD PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRANKSTON RELOCATION OF FACILITIES OCTOBER 3423 080.70999 14,245 INSTALL 1068 FEET OF 6 INCH, 339 FEET OF 4 INCH AND 206 FEET OF 2 INCH POLY ALONG STREETS OF CELINA 15. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ALLEN GROWTH MARCH 3424 080.71000 11,816 INSTALL 490 FEET OF 4 INCH POLY AND ABANDON 150 FEET OF 6 INCH CAST IRON, 225 FEET OF 4 INCH CAST IRON, 75 FEET OF 4 INCH STEEL ALONG SUTTER AND OWASSO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3425 080.71001 607 INSTALL 250 FEET OF 2 INCH POLY ALONG WOODVILLE ROAD AND ABANDON 250 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 3426 080.71011 52,383 RELOCATE FACILITIES. INSTALL 2240 FEET OF 6 INCH POLY AND 215 FEET OF 4 INCH POLY ALONG SOUTH PIPELINE ROAD AND ABANDON 2180 FEET OF 4 INCH AND 60 FEET OF 3 INCH STEEL AND 70 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF EULESS STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS RELOCATION OF FACILITIES OCTOBER 3427 080.71014 4,485 REPLACE DISTRICT REGULATOR STATION 204 WITH 2 INCH PRESSURE REGULATOR, RELIEF VALVE, AND ABOVE GROUND SENSING LINE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3428 080.71015 7,289 INSTALL 500 FEET OF 4 INCH POLY ALONG LONDONDERRY DRIVE AND ABANDON 490 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 3429 080.71018 45,061 RELOCATE FACILITIES. INSTALL 3565 FEET OF 4 INCH AND 3285 FEET OF 2 INCH POLY ALONG GLENN LANE AND MILAS LANE AND ABANDON 6850 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF GLENN HEIGHTS ROAD IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLENN HEIGHTS RELOCATION OF FACILITIES OCTOBER 3430 080.71021 7,904 INSTALL 520 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY ALONG WEST PARKWAY AND ABANDON 377 FEET OF 3 INCH AND 230 FEET OF 2 INCH AND 20 FEET OF 4 INCH STEEL AND 54 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER 3431 080.71028 5,622 INSTALL 230 FEET OF 4 INCH POLY ALONG HANNAFORD AND RUCKER ROAD AND ABANDON 310 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY OCTOBER 3432 080.71030 13,568 REPLACE HIGH PRESSURE SERVICE LINE ON LINE KC (WEST) IN ACCORDANCE WITH THE RAILAROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 3433 080.71031 177,732 RELOCATE FACILITIES. INSTALL 524 FEET OF 2 INCH POLY AND ABANDON 507 FEET OF 2 INCH STEEL ALONG BATES STREET IN ACCORDANCE TO THE TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY DECEMBER 3434 080.71033 4,163 RELOCATE FACILITIES. INSTALL 3580 FEET OF 4 INCH POLY ALONG OLD HEARNE ROAD AND ABANDON 1465 FEET OF 4 INCH, 1383 FEET OF 3 INCH AND 98 FEET OF 2 INCH POLY AND 70 FEET OF 2 INCH AND 225 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES OCTOBER 3435 080.71035 9,965 INSTALL 5425 FEET OF 2 INCH, 3005 FEET OF 4 INCH, AND 2060 FEET OF 6 INCH POLY ALONG THE STREETS OF PECAN SQUARE. RESIDENTIAL NORTHLAKE GROWTH DECEMBER 3436 080.71039 55,245 RELOCATE FACILITIES. INSTALL 980 FEET OF 8 INCH POLY ALONG PRAIRIE DRIVE AND ABANDON 975 FEET OF 8 INCH POLY TO ACCOMMODATE TOWN OF PROSPER STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PROSPER RELOCATION OF FACILITIES OCTOBER 3437 080.71043 771,000 INSTALL 3,600 FEET OF 3 INCH STEEL ALONG LINE U22 IN SEAGOVILLE AND ABANDON 3,600 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCCAULLEY SYSTEM INTEGRITY DECEMBER 3438 080.71044 7,056 ABANDON 143 FEET OF 4 INCH CAST IRON, 247 FEET OF 4 INCH POLY, 550 FEET OF 3 INCH STEEL AND 30 FEET OF 4 INCH STEEL ALONG AVENUE I IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER 3439 080.71045 19,170 INSTALL 35 FEET OF 4 INCH POLY ALONG GATTIS SCHOOL ROAD. COMMERCIAL OR INDUSTRIAL HUTTO GROWTH AUGUST 3440 080.71050 1,788 INSTALL 95 FEET OF 4 INCH POLY ALONG EAST 31ST STREET AND ABANDON 200 FEET OF 2 INCH AND 150 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 3441 080.71070 1,589 INSTALL 150 FEET OF 4 INCH AND 600 FEET OF 2 INCH POLY ALONG STREETS OF URBAN DISTRICT. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL MESQUITE GROWTH JUNE MTX Additions Page 106 of 178 325 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3442 080.71079 6,379 ABANDON 27 FEET OF 3 INCH, 2838 FEET OF 4 INCH AND 326 FEET OF 6 INCH POLY 1216 FEET OF 3 INCH AND 99 FEET OF 4 INCH STEEL ALONG PARKWOOD BOULEVARD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO SYSTEM INTEGRITY OCTOBER 3443 080.71081 4,139 INSTALL 500 FEET OF 2 INCH POLY AND ABANDON 100 FEET OF 4 INCH STEEL AND 1200 FEET OF 3 INCH STEEL ALONG EAST BELKNAP STREET AND OAK KNOLL DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY OCTOBER 3444 080.71082 25,406 INSTALL 380 FEET OF 4 INCH POLY ALONG EMERSON AND PRESTON ROAD AND ABANDON 380 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER 3445 080.71085 (7,600) INSTALL 345 FEET OF 4 INCH POLY ALONG TREEPOINT DRIVE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL ARLINGTON GROWTH JUNE 3446 080.71090 3,502 INSTALL 350 FEET OF 2 INCH POLY ALONG ROSS AVENUE AND LESLIE STREET AND ABANDON 950 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 3447 080.71091 21,661 INSTALL 985 FEET OF 6 INCH POLY AND 820 FEET OF 2 INCH POLY ALONG BRADY AVENUE AND 2ND STREET AND ABANDON 295 FEET OF 6 INCH 13 FEET OF 2 INCH POLY AND 1190 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER 3448 080.71092 412 INSTALL 400 FEET OF 4 INCH POLY ALONG GOLIAD STREET. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL ROCKWALL GROWTH NOVEMBER 3449 080.71095 (140) INSTALL 2,420 FEET OF 2 INCH, 1,350 FEET OF 4 INCH AND 3,805 FEET OF 6 INCH POLY ALONG THE STREETS OF AVALON AT ARGYLE PHASE 1. RESIDENTIAL ARGYLE GROWTH MARCH 3450 080.71099 13,846 INSTALL 1260 FEET OF 4 INCH POLY ALONG MOSS STREET AND ABANDON 1747 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILRAOD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND SYSTEM INTEGRITY OCTOBER 3451 080.71100 (86,282) INSTALL 500 FEET OF 4 INCH STEEL ALONG GREENBELT ROAD AND FORT WORTH BIOSOLIDS FACILITY. ALL CUSTOMERS FORT WORTH GROWTH SEPTEMBER 3452 080.71102 4,418 INSTALL 290 FEET OF 4 INCH POLY AND ABANDON 290 FEET OF 3 INCH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE SYSTEM INTEGRITY OCTOBER 3453 080.71105 3,240 INSTALL 280 FEET OF 2 INCH POLY ALONG METCALF ROAD AND ABANDON 280 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY OCTOBER 3454 080.71107 7,950 INSTALL 670 FEET OF 4 INCH POLY ALONG BONHAM STREET AND ABANDON 670 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY OCTOBER 3455 080.71109 36,951 INSTALL 1700 FEET OF 4 INCH POLY ALONG DONOHO STREET AND ABANDON 1415 FEET OF 4 INCH, 415 FEET OF 2 INCH STEEL, 230 FEET OF 4 INCH AND 10 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLARKSVILLE SYSTEM INTEGRITY DECEMBER 3456 080.71114 1,372 RELOCATE FACILITIES. INSTALL 175 FEET OF 2 INCH POLY AND ABANDON 160 FEET OF 2 INCH STEEL ALONG NORTH ASH STREET TO ACCOMMODATE CITY OF SPRINGTOWN STREET PROJECT IN ACCORDANCE TO THE TEXAS RAILROAD COMMISSION RULE 8.209 ALL CUSTOMERS SPRINGTOWN RELOCATION OF FACILITIES OCTOBER 3457 080.71116 13,990 INSTALL (3) LOW PRESSURE VALVES ON ABILENE LOW PRESSURE SYSTEM IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 3458 080.71119 20,769 INSTALL 3,600 FEET OF 2 INCH POLY AND ABANDON 2,481 FEET OF 2 INCH STEEL AND 1,172 FEET OF 2 INCH POLY ALONG FIRST AT WILLOW AND MAPLE STREETS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LINDSAY SYSTEM INTEGRITY OCTOBER 3459 080.71121 4,555 RELOCATE FACILITIES. INSTALL 247 FEET OF 4 INCH POLY AND ABANDON 182 FEET OF 4 INCH POLY TO ACCOMMODATE TXDOT ROAD IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON RELOCATION OF FACILITIES OCTOBER 3460 080.71124 6,798 INSTALL 715 FEET OF 2 INCH POLY ALONG N. SMYTH STREET AND ABANDON 315 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILORAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY OCTOBER 3461 080.71126 87,414 INSTALL 2300 FEET OF 2 INCH POLY ALONG PEGGY LANE AND ABANDON 2300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 3462 080.71128 267 INSTALL 780 FEET OF 2 INCH POLY ALONG VANGUARD WAY. RESIDENTIAL DALLAS GROWTH MARCH 3463 080.71129 (246,358) RELOCATE FACILITIES. INSTALL 275 FEET OF 2 INCH, 480 FEET OF 4 INCH, 1000 FEET OF 6 INCH AND 305 FEET OF 8 INCH POLY ALONG SKILLMAN STREET AND ABANDON 690 FEET OF 2 INCH AND 220 FEET OF 3 INCH POLY AND 1390 FEET OF 4 INCH STEEL TO ACCOMMODATE TXDOT PROJECT. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES JULY 3464 080.71130 63,532 INSTALL 343 FEET OF 4 INCH POLY ALONG OAKMONT DRIVE AND ABANDON 337 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY OCTOBER 3465 080.71134 18,462 RELOCATE FACILITIES. INSTALL 750 OF 2 INCH POLY ALONG HARLAN STREET AND ABANDON 750 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 3466 080.71143 14,898 RELOCATE FACILITIES. INSTALL APPROXIMATELY 108 FEET OF 4 INCH POLY ALONG US 79 TO ACCOMMODATE TXDOT ROAD IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKDALE RELOCATION OF FACILITIES OCTOBER 3467 080.71145 7,360 INSTALL 462 FEET OF 6 INCH POLY ALONG WILMETH ROAD AND ABANDON 508 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF MCKINNEY ROAD PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY OCTOBER 3468 080.71148 19,474 INSTALL 1140 FEET OF 2 INCH POLY ALONG ROBINWOOD DRIVE AND GREGORY DRIVE AND ABANDON 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 3469 080.71150 3,601 INSTALL 175 FEET OF 4 INCH POLY ALONG SOUTH 11TH STREET AND ABANDON 175 FEET OF 4 INCH CAST IRON IN ACCRODANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 3470 080.71155 36,007 REPLACE DRS 312 AND INSTALL 1150 FEET OF 2 INCH POLY, 250 FEET OF 4 INCH POLY AND ABANDON 320 FEET OF 3 INCH POLY, 1610 FEET OF 2 INCH STEEL, 250 FEET OF 3 INCH POLY AND ABANDON DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3471 080.71165 17,837 RELOCATE FACILITIES. INSTALL 212 FEET OF 4 INCH POLY AND ABANDON 200 FEET OF 4 INCH POLY AND 880 FEET OF 2 INCH POLY TO ACCOMMODATE DART RAIL LINE IN DALLAS COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON RELOCATION OF FACILITIES OCTOBER 3472 080.71168 (31,492) RELOCATE FACILITIES. INSTALL 175 FEET OF 2 INCH POLY ALONG ACCENT DRIVE AND ABANDON 135 FEET OF 2INCH POLY. ALL CUSTOMERS PLANO SYSTEM INTEGRITY JUNE 3473 080.71170 6,952 RELOCATE FACILITIES. INSTALL 72 FEET OF 2 INCH POLY AND ABANDON 64 FEET OF POLY ALONG LIDO WAY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE TO THE TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 3474 080.71172 507 INSTALL 3,395 FEET OF 2 INCH, 2,976 FEET OF 4 INCH AND 838 FEET OF 6 INCH POLY ALONG THE STREETS OF CLAIRMONT ESTATES. RESIDENTIAL PONDER GROWTH MAY 3475 080.71173 24,487 INSTALL 1550 OF 2 POLY ALONG BIRDWELL STREET AND ABANDON 1500 OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3476 080.71174 (13,814) INSTALL 790 FEET OF 4 INCH AND 5 FEET OF 2 INCH POLY AND ABANDON 585 FEET OF 4 INCH AND 395 FEET OF 2 INCH POLY IN RED BIRD MALL. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 3477 080.71177 1,877,249 RELOCATE FACILITIES. INSTALL 874 FEET OF 2 INCH, 6104 FEET OF 4 INCH AND 2279 FEET OF 6 INCH POLY ALONG HIGHWAY 5 AND ABANDON DISTRICT REGULATOR STATION #3, 1143 FEET OF 1-1/4 & 2 INCH AND 3308 FEET OF 3 INCH STEEL AND 432 FEET OF 2 INCH POLY, 1619 FEET OF 3 POLY, 238 FEET OF 4 INCH POLY AND 1932 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA SYSTEM INTEGRITY DECEMBER 3478 080.71185 8,199 RELOCATE FACILITIES. INSTALL 700 FEET OF 4 INCH POLY ALONG DANIELDALE ROAD AND ABANDON 1250 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF DUNCANVILLE ROAD IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE RELOCATION OF FACILITIES OCTOBER MTX Additions Page 107 of 178 326 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3479 080.71189 8,395 INSTALL 300 FEET OF 4 INCH POLY AND 10 FEET OF 2 INCH POLY ALONG CULVER STREET ABANDON 300 FEET OF 4 INCH STEEL AND 10 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY OCTOBER 3480 080.71192 11,596 INSTALL 400 FEET OF 4 INCH POLY ALONG WALNUT STREET AND ABANDON 400 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY OCTOBER 3481 080.71211 66,434 INSTALL 1520 FEET OF 4 INCH AND 2310 FEET OF 2 INCH POLY ALONG JOHN MCAIN ROAD. RESIDENTIAL COLLEYVILLE GROWTH SEPTEMBER 3482 080.71214 11,389 INSTALL 975 FEET OF 4 INCH POLY AND ABANDON 975 FEET OF 3 INCH STEEL ALONG WEST DIVISION STREET SOUTH OF LILLARD ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 3483 080.71222 54,442 INSTALL 1.975 FEET OF 2 INCH AND 2,295 FEET OF 4 INCH POLY ALONG THE STREETS OF SYCAMORE COVE SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HICKORY CREEK GROWTH JUNE 3484 080.71223 5,106 INSTALL 2990 FEET OF 2 INCH POLY ALONG THE STREETS OF SHADOWGLEN DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANOR GROWTH JUNE 3485 080.71224 42,802 INSTALL 1400 FEET OF 2 INCH POLY AND ABANDON 125 FEET OF 4 INCH STEEL, 292 FEET OF 4 INCH POLY, 211 FEET OF 3 INCH STEEL, 145 FEET OF 2 INCH STEEL, 346 FEET OF 2 INCH POLY, AND 151 FEET OF 2 INCH STEEL AND DISTRICT REGLUATOR STATION 23 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY DECEMBER 3486 080.71235 305,643 INSTALL 1,466 FEET OF 4 INCH AND 1,973 FEET OF 6 INCH POLY ALONG THE STREETS OF DENTON HIGH SCHOOL AND KINGS RIDGE SUBDIVISION. ALL CUSTOMERS DENTON GROWTH SEPTEMBER 3487 080.71236 1,047,387 INSTALL 7,223 FEET OF 6 INCH POLY ALONG THE STREETS OF GLENWOOD MEADOWS SUBDIVISION IN DENTON. ALL CUSTOMERS DENTON GROWTH DECEMBER 3488 080.71237 484 INSTALL 2,310 FEET OF 2 INCH AND 1,208 FEET OF 4 INCH POLY ALONG THE STREETS OF FALCON PLACE. RESIDENTIAL LAKE DALLAS GROWTH JUNE 3489 080.71238 49 INSTALL 3510 FEET OF 4 INCH POLY ALONG THE STREETS OF HICKORY CREEK SUBDIVISION. RESIDENTIAL HICKORY CREEK GROWTH MARCH 3490 080.71239 8,109 INSTALL 9,365 FEET OF 2 INCH AND 1,605 FEET OF 6 INCH POLY ALONG THE STREETS OF TRADITION. RESIDENTIAL FORT WORTH GROWTH JUNE 3491 080.71240 507 INSTALL 3,710 FEET OF 2 INCH AND 895 FEET OF 4 INCH POLY ALONG THE STREETS OF TRADITION PHASE 1C. RESIDENTIAL JUSTIN GROWTH APRIL 3492 080.71250 15,980 INSTALL 2,950 FEET OF 2 INCH POLY ALONG THE STREETS OF WILDRIDGE PHASE 5B SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL UNINCORPORATED GROWTH APRIL 3493 080.71251 177,189 INSTALL 5,650 FEET OF 2 INCH AND 755 FEET OF 4 INCH POLY ALONG THE STREETS OF KINGS RIDGE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH JULY 3494 080.71254 13,150 INSTALL 1405 FEET OF 4 INCH AND 3862 FEET OF 2 INCH POLY ALONG THE STREETS OF SHADOWGLEN SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANOR GROWTH JULY 3495 080.71255 178,373 RELOCATE FACILITIES. INSTALL 1769 FEET OF 20 INCH STEEL AND ABANDON 1759 FEET OF 20 INCH STEEL ALONG IH 635 TO ACCOMODATE TXDOT IH 635 IMPROVEMENTS PROJECT. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES DECEMBER 3496 080.71263 6,998 INSTALL 1088 FEET OF 4 INCH AND 1620 FEET OF 2 INCH POLY ALONG THE STREETS OF SHADOWGLEN SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANOR GROWTH SEPTEMBER 3497 080.71267 5,265 RELOCATE FACILITIES. INSTALL 80 FEET OF 6 INCH POLY ALONG WOODWARD AVENUE AND ABANDON 80 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF CLEBURNE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE RELOCATION OF FACILITIES OCTOBER 3498 080.71271 30,324 INSTALL 2,155 FEET OF 2 INCH, 1,565 FEET OF 4 INCH POLY ALONG THE STREETS OF COUNTRY CLUB ROAD ESTATES SUBDIVISION IN DENTON. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH DECEMBER 3499 080.71274 17,015 INSTALL 1700 FEET OF 2 INCH POLY ALONG CHURCH STREET AND ABANDON DISTRICT REGULATOR STATION 06, 1016 FEET OF 3 INCH STEEL, 158 FEET OF 4 INCH STEEL, 65 FEET OF 2 INCH STEEL, 350 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LADONIA SYSTEM INTEGRITY OCTOBER 3500 080.71276 111,718 INSTALL 4 INCH STEEL ALONG LINE O28. ALL CUSTOMERS GARLAND SYSTEM IMPROVEMENT SEPTEMBER 3501 080.71278 22,609 INSTALL 1750 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 325 FEET OF 4 INCH STEEL, 810 FEET OF 3 INCH POLY, 605 FEET OF 2 INCH STEEL, 9 FEET OF 2 INCH POLY AND ABANDON DRS 01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PECAN GAP SYSTEM INTEGRITY OCTOBER 3502 080.71284 5,543 INSTALL 2600 FEET OF 4 INCH POLY ALONG THE STREETS OF DALLAS. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL DALLAS GROWTH JUNE 3503 080.71285 12,795 REPLACE DISTRICT REGULATOR STATION 11 ALONG ALAMO STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER 3504 080.71294 21,043 INSTALL 2500 FEET OF 2 INCH POLY AND ABANDON 2550 FEET OF 3 INCH POLY ALONG COLLEGE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 3505 080.71302 7,893 INSTALL 1075 FEET OF 4 INCH AND 350 FEET OF 2 INCH POLY ALONG NORTH BANKS AND WEST 5TH STREET AND ABANDON 485 FEET OF 2 INCH AND 922 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALDWELL SYSTEM INTEGRITY OCTOBER 3506 080.71303 11,328 INSTALL 600 FEET OF 4 INCH AND 700 FEET OF 2 INCH POLY ALONG NORTH BANKS STREET AND ABANDON 600 FEET OF 2 INCH COATED STEEL AND 700 FEET OF 2 INCH BARE STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALDWELL SYSTEM INTEGRITY OCTOBER 3507 080.71304 3,771,293 INSTALL 13,251 FEET OF 12 INCH POLY ALONG HARMON ROAD FROM HERITAGE TRACE PARKWAY TO GOLDEN TRIANGLE ROAD IN FORT WORTH. ALL CUSTOMERS FORT WORTH SYSTEM IMPROVEMENT DECEMBER 3508 080.71305 4,223 RELOCATE FACILITIES. INSTALL 250 FEET OF 6 INCH POLY, 75 FEET OF 2 INCH POLY AND ABANDON 150 FEET OF 4 INCH STEEL, 90 FEET OF 4 INCH POLY, AND 75 FEET OF 2 INCH STEEL ALONG PROJECT E MAIN STREET AND N HAMPTON ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY RELOCATION OF FACILITIES OCTOBER 3509 080.71313 (5,306) INSTALL 4 INCH SERVICE LINE AND METER ALONG STREETS OF WALMART. COMMERCIAL OR INDUSTRIAL SNYDER GROWTH JUNE 3510 080.71314 988 INSTALL 2852 FEET OF 2 INCH POLY ALONG STREETS OF THE MERION AT MIDTOWN. RESIDENTIAL DALLAS GROWTH JUNE 3511 080.71321 15,910 INSTALL 1,760 FEET OF 2 INCH POLY AND ABANDON 1,460 FEET OF 3 INCH STEEL ALONG LAMAR AND ACHESON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER 3512 080.71322 86,423 INSTALL (216) POLY SERVICES AND ABANDON (216) STEEL SERVICES IN SAN ANGELO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 3513 080.71323 61,876 INSTALL 137 POLY SERVICE LINES AND ABANDON 137 STEEL SERVICE LINES ALONG THE STREETS OF WACO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 3514 080.71324 45,574 INSTALL (105) POLY SERVICES AND ABANDON (105) STEEL SERVICES IN VERNON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER 3515 080.71325 1,045 INSTALL 1602 FEET OF 8 INCH AND 3531 FEET OF 6 INCH POLY ALONG THE STREETS OF HIGHWAY 380. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FRISCO GROWTH MARCH 3516 080.71329 13,067 REPLACE DISTRICT REGULATOR STATION 208 WITH NEW STATION PIPING, REGULATOR, RELIEF VALVE, AND ABOVE GROUND SENSING LINE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3517 080.71332 53,262 REPLACE 99 STEEL SERVICES WITH POLY SERVICES ALONG MAPSHEET IN DENISON 035 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER 3518 080.71333 37,877 REPLACE 50 STEEL SERVICES WITH POLY SERVICES ALONG MAPSHEET IN KERRVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER 3519 080.71336 67,498 INSTALL (126) SERVICE LINES AND ABANDON (126) SERVICE LINES IN KERVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER MTX Additions Page 108 of 178 327 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3520 080.71337 8,322 INSTALL 1164 FEET OF 4 INCH AND 2965 FEET OF 2 INCH POLY ALONG THE STREETS OF SHADOWGLEN SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANOR GROWTH JULY 3521 080.71342 4,637 RELOCATE FACILITIES. INSTALL 115 FEET OF 6 INCH STEEL ALONG JACK WHITE STREET AND ABANDON 115 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF TEMPLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE RELOCATION OF FACILITIES OCTOBER 3522 080.71343 2,501 RELOCATE FACILITIES. INSTALL 290 FEET OF 2 INCH POLY AND ABANDON 230 FEET OF 3 INCH AND 2 INCH STEEL ALONG US75 TO ACCOMMODATE CITY OF SHERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES OCTOBER 3523 080.71344 9,415 REPLACE DISTRICT REGULATOR STATION 209 WITH NEW STATION PIPING, REGULATOR, RELIEF VALVE, AND ABOVE GROUND SENSING LINE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3524 080.71346 8,971 REPLACE DISTRICT REGULATOR STATION 211 IN FORT WORTH AND ABANDON DISTRICT REGULATOR STATION 211 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3525 080.71348 4,070 INSTALL DISTRICT REGULATOR STATION 213 AND ABANDON DISTRICT REGULATOR STATION 213 ALONG NW 14TH STREET IN FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3526 080.71349 6,191 REPLACE DISTRICT REGULATOR STATION 216 WITH STATION PIPING, PRESSURE REGULATOR, RELIEF VALVE, AND ABOVE GROUND SENSING LINE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3527 080.71350 5,077 REPLACE DISTRICT REGULATOR STATION 221 WITH STATION PIPING,PRESSURE REGULATOR, RELIEF VALVE, AND ABOVE GROUND SENSING LINE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3528 080.71352 6,546 REPLACE DISTRICT REGULATOR STATION 229 WITH STATION PIPING, PRESSURE REGULATOR, RELIEF VALVE, AND ABOVE GROUND SENSING LINE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3529 080.71353 88,032 RELOCATE FACILITIES. INSTALL 220 FEET OF 6 INCH, 75 FEET OF 4 INCH POLY ALONG KIMBALL AVE IN GRAPEVINE AND ABANDON 120 FEET OF 4 INCH STEEL AND 25 FEET OF 6 INCH POLY. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY AUGUST 3530 080.71359 9,660 INSTALL AND ABANDON DISTRICT REGULATOR STATION 07 AND ABANDON DISTRICT REGULATOR STATION 16 IN BALLINGER IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY OCTOBER 3531 080.71365 8,514 RELOCATE FACILITIES. INSTALL 120 FEET OF 4 INCH POLY AND ABANDON 120 FEET OF 4 INCH POLY ALONG BELT LINE ROAD TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENTS IN ACCORDANCE WITH THE RAILROAD COMMSSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES OCTOBER 3532 080.71367 12,780 INSTALL 1600 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 17 ALONG JACKSON STREET. IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA SYSTEM INTEGRITY OCTOBER 3533 080.71368 11,357 INSTALL 2,225 FEET OF 2 INCH POLY AND ABANDON 2,233 FEET OF 2 INCH STEEL, 222 FEET OF 2 INCH POLY, 285 FEET OF 4 INCH STEEL, DISTRICT REGULATOR STATION 112 ALONG JACQUELINE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3534 080.71369 21,032 INSTALL 2350 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY ALONG ROBERTS STREET AND ABANDON 1919 FEET OF 4 INCH AND 627 FEET OF 3 INCH STEEL AND VERNON DISTRICT REGLUATOR STATION 18 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER 3535 080.71380 31,752 INSTALL 1695 FEET OF 6 INCH POLY, 1100 FEET OF 4 INCH AND 4564 FEET OF 2 INCH POLY ALONG THE STREETS OF LARKSPUR 11. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH OCTOBER 3536 080.71381 206 INSTALL 350 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY ALONG THE STREETS OF ALTA 287 TOWNHOMES. DEVELOPER INSTALLED FACILITES. ALL CUSTOMERS KENNEDALE GROWTH OCTOBER 3537 080.71387 474,267 INSTALL 2,750 FEET OF 2 INCH POLY AND ABANDON 2,750 FEET OF 4 INCH STEEL ALONG THE STREETS OF TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY DECEMBER 3538 080.71388 25,730 INSTALL 800 FEET OF 6 INCH STEEL AND ABANDON 800 FEET OF 6 INCH STEEL ALONG LINE M6 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLOOMING GROVE SYSTEM INTEGRITY OCTOBER 3539 080.71389 3,631 INSTALL AND REPLACE 1 DISTRICT REGULATOR STATION 109 IN FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3540 080.71390 4 INSTALL 2360 FEET OF 2 INCH POLY ALONG STREETS OF WILLIAMS CREEK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH JANUARY 3541 080.71391 8,766 INSTALL 1,500 FEET OF 2 INCH POLY AND ABANDON 290 FEET OF 2 INCH STEEL, 278 FEET 4 INCH STEEL AND 831 FEET OF 4 INCH POLY ALONG EAST MAGINNIS STREET. IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHICO SYSTEM INTEGRITY OCTOBER 3542 080.71393 3,447 RELOCATE FACILITIES. INSTALL 36 FEET OF 6 INCH POLY ALONG PRESTON ROAD AND ABANDON 36 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FRISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO RELOCATION OF FACILITIES OCTOBER 3543 080.71395 13,360 INSTALL 1,400 FEET OF 2 INCH POLY ALONG EAST MCKINNEY STREET AND ABANDON 272 FEET OF 3 INCH POLY AND 375 FEET OF 3 INCH STEEL AND 465 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PILOT POINT SYSTEM INTEGRITY OCTOBER 3544 080.71397 13,903 RELOCATE FACILITES. INSTALL 1150 FEET OF 2 INCH POLY ALONG COLONIAL AVENUE AND ABANDON 940 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 3545 080.71401 641 INSTALL 5700 FEET OF 2 INCH POLY AND 1780 FEET OF 4 INCH POLY ALONG THE STREETS OF CREEKSIDE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH APRIL 3546 080.71403 5,734 REPLACE DISTRICT REGLUATOR STATION 128 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3547 080.71408 28,378 INSTALL 4425 FEET OF 2 INCH POLY ALONG OAK MEADOW LANE AND ABANDON 3560 FEET OF 3 INCH POLY, 315 FEET OF 2 INCH POLY AND 995 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL SYSTEM INTEGRITY OCTOBER 3548 080.71412 349,308 INSTALL 5150 FEET OF 4 INCH POLY AND 1709 FEET OF 2 INCH POLY AND ABANDON 944 FEET OF 6 INCH POLY, 3646 FEET OF 3 INCH POLY, AND 1919 FEET OF 2 INCH POLY ALONG THUNDERBIRD LANE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY OCTOBER 3549 080.71416 49,385 INSTALL 3900 FEET OF 6 INCH POLY ALONG BOWSER ROAD AND ABANDON 3900 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY OCTOBER 3550 080.71417 4,463 INSTALL DISTRICT REGULATOR STATION ALONG STREETS OF FORT WORTH AND ABANDON DISTRICT REGULATOR STATION 129 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3551 080.71420 1,807 RELOCATE FACILITIES. INSTALL 1 SERVICE ALONG DRUMMOND AND ABANDON ONE SERVICE TO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 3552 080.71423 9,084 INSTALL 1500 FEET OF 2 INCH POLY AND ABANDON 49 FEET OF 2 INCH POLY AND 2317 FEET OF 2 INCH STEEL AND PUTNAM DISTRICT REGULATOR STATION 05 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PUTNAM SYSTEM INTEGRITY OCTOBER 3553 080.71425 10,710 INSTALL 1650 FEET OF 2 INCH POLY AND ABANDON 947 FEET OF 2 INCH POLY AND 1553 FEET OF 2 INCH STEEL AND PUTNAM DISTRICT REGULATOR STATION 06 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PUTNAM SYSTEM INTEGRITY OCTOBER 3554 080.71426 4,496 INSTALL DISTRIBUTION REGULATOR STATION 133 AND REPLACE EXISTING STATION IN FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER MTX Additions Page 109 of 178 328 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3555 080.71427 12,673 INSTALL 800 FEET OF 4 INCH POLY ALONG BURLESON STREET AND ABANDON 800 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 3556 080.71429 374,471 RELOCATE FACILIITES. INSTALL 1,078 FEET OF 6 INCH POLY AND 283 FEET OF 10 INCH STEEL AND ABANDON 120 FEET OF 6 INCH, 958 FEET OF 4 INCH POLY AND 110 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WYLIE SYSTEM INTEGRITY SEPTEMBER 3557 080.71431 2,745 INSTALL DISTRICT REGULATOR STATION ALONG STREETS OF FORT WORTH AND ABANDON DISTRICT REGULATOR STATION 149 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3558 080.71436 933 INSTALL 4081 FEET OF 2 INCH POLY ALONG STREETS OF THE SUBDIVISION WADE SETTLEMENT PHASE 2. RESIDENTIAL FRISCO GROWTH JUNE 3559 080.71438 18,899 INSTALL APPROXIMATELY 350 FEET OF 2 INCH AND 500 FEET OF 4 INCH POLY ALONG WEST TEXAS AVENUE AND LAMAR STREET AND ABANDON APPROXIMATELY 1000 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OFTEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER 3560 080.71442 42,504 RELOCATE FACILITIES. INSTALL 1820 FEET OF 2 INCH POLY AND ABANDON 1050 FEET OF 2 INCH STEEL, 630 FEET OF 2 INCH POLY, 120 FEET OF 2 INCH STEEL ALONG BENTON AVENUE AND WINDOWMERE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3561 080.71443 6,388 INSTALL 630 FEET OF 4 INCH POLY AND ABANDON 550 FEET OF 4 INCH STEEL AND 80 FEET OF 4 INCH POLY ALONG CASH AND TEXOWA IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY OCTOBER 3562 080.71445 1,287 ABANDON DISTRICT REGULATOR STATION #066 IN DALLAS, DALLAS COUNTY AS PART OF THE AREA REPLACEMENT PROJECT AR ID#3006.1 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3563 080.71449 5,279 RELOCATE FAILITIES. INSTALL 450 FEET OF 2 INCH POLY, 450 FEET OF 2 INCH STEEL ALONG BARGER DRIVE AND BOZE STREET TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE RELOCATION OF FACILITIES OCTOBER 3564 080.71460 358,625 INSTALL 8,350 FEET OF 2 INCH AND 2,995 FEET OF 4 INCH POLY ALONG THE STREETS OF ERICKSON FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL KRUM GROWTH DECEMBER 3565 080.71462 133,391 INSTALL 3445 FEET OF 2 INCH POLY ALONG THE STREETS OF EAGLE CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH SEPTEMBER 3566 080.71463 200,060 INSTALL 2,595 FEET OF 2 INCH AND 3,180 FEET OF 4 INCH POLY ALONG THE STREETS OF EAGLE CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH DECEMBER 3567 080.71464 119,430 INSTALL 3,360 FEET OF 2 INCH POLY ALONG THE STREETS OF EAGLE CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH OCTOBER 3568 080.71467 347,497 INSTALL DISTRICT REGULATOR STATION #237 AND 1,500 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION #237, 1,500 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 3569 080.71471 6,200 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION 155 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3570 080.71478 3 INSTALL 3080 FEET OF 4 INCH POLY ALONG LOOP 567 AT WEATHERFORD HIGHWAY. ALL CUSTOMERS GRANBURY GROWTH JANUARY 3571 080.71479 28,704 INSTALL 1,440 FEET OF 4 INCH AND 2,100 FEET OF 2 INCH POLY ALONG THE STREETS OF SANDSTONE ESTATES SUBDIVISION. DEVELOPER INSTALLED FACILIITES. RESIDENTIAL GRANBURY GROWTH JULY 3572 080.71484 6,585 REPLACE DISTRICT REGULATOR STATION 304 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3573 080.71485 18,197 PURCHASE CP TEST STATIONS AND RETIRE TEST STATION ALONG LINE M11 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABBOTT SYSTEM INTEGRITY OCTOBER 3574 080.71489 6,133 INSTALL LOW PRESSURE DISTRIBUTION REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3575 080.71494 3,033 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION 411 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3576 080.71496 47,133 INSTALL 2900 FEET OF 4 INCH STEEL ALONG LINE R7 AND ABANDON 2900 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWENA SYSTEM INTEGRITY OCTOBER 3577 080.71499 4,740 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION 415 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3578 080.71514 18,263 INSTALL 2688 FEET OF 2 INCH POLY ALONG W BARNETT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER 3579 080.71516 4,168 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION 402 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3580 080.71517 29,273 RELOCATE FACILITIES. INSTALL 3,750 FEET OF 4 INCH AND 350 FEET OF 2 INCH POLY ALONG HARD ROCK ROAD AND PIONEER DRIVE AND ABANDON 20 FEET OF 6 INCH POLY, 617 FEET OF 4 INCH STEEL, 1,948 FEET OF 4 INCH POLY, 951 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 3581 080.71518 180,496 INSTALL 5,362 FEET OF 2 INCH AND 1,609 FEET OF 4 INCH POLY ALONG THE STREETS OF THE WILSON CREEK MEADOWS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH DECEMBER 3582 080.71519 153,596 INSTALL 3,351 FEET OF 2 INCH AND 1,754 FEET OF 4 INCH POLY ALONG THE STREETS OF THE WILSON CREEK MEADOWS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH DECEMBER 3583 080.71521 249,643 INSTALL 4,192 FEET OF 2 INCH, 20 FEET OF 4 INCH, AND 1,558 FEET OF 6 INCH POLY ALONG THE STREETS OF THE MCKINNEY PAINTED TREE SUBDIVISION. RESIDENTIAL MCKINNEY GROWTH SEPTEMBER 3584 080.71522 349,944 INSTALL DISTRICT REGULATOR STATION 407 AND ABANDON DISTRCT REGULATOR STATION #407 ALONG THE STREETS OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 3585 080.71523 6,599 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION 410 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3586 080.71527 801 INSTALL 2160 FEET OF 4 INCH POLY AND 4920 FEET OF 2 INCH POLY ALONG THE STREETS OF WOODCREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FATE GROWTH APRIL 3587 080.71528 24,840 INSTALL DISTRICT REGULATOR STATION 426 IN FORT WORTH AND ABANDON DISTRICT REGULATOR STATION 426 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3588 080.71529 4,964 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION 503 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3589 080.71530 3,720 RELOCATE FACILITES. INSTALL 25 FEET OF 2 INCH POLY AND ABANDON 25 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF MCKINNEY STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES OCTOBER 3590 080.71531 4,687 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION 503 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3591 080.71534 52,280 RELOCATE FACILITIES. INSTALL 1950 FEET OF 4 INCH AND 1715 FEET OF 2 INCH POLY ALONG SOUTH BROAD STREETAND ABANDON 2640 FEET OF 3 INCH STEEL 1075 FEET OF 3 INCH AND 260 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CEDAR HILL STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL RELOCATION OF FACILITIES OCTOBER MTX Additions Page 110 of 178 329 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3592 080.71539 313,883 INSTALL 7500 FEET 6 IN STEEL AND 7500 FEET OF 6 INCH STEEL ALONG FISHTRAP ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER 3593 080.71540 35,762 INSTALL DISTRICT REGULATOR STATION 506 AND ABANDON DISTRICT REGULATOR STATION 506 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3594 080.71547 1,446 INSTALL 5535 FEET OF 2 INCH, 165 FEET OF 4 INCH POLY ALONG THE STREETS OF TRINITY FALLS SUBDIVISION. RESIDENTIAL MCKINNEY GROWTH MARCH 3595 080.71553 14 INSTALL 5105 FEET OF 4 INCH POLY AND 5630 FEET OF 2 INCH POLY ALONG THE STREETS OF WATERCRESS SUBDIVISION. RESIDENTIAL HASLET GROWTH JANUARY 3596 080.71554 (15) INSTALL 300 FEET OF 2 INCH POLY ALONG TUSCOLA. RESIDENTIAL TUSCOLA GROWTH FEBRUARY 3597 080.71556 3,283 INSTALL 605 FEET OF 4 INCH POLY AND 30 FEET OF 2 INCH POLY ALONG MILLER ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MELISSA GROWTH DECEMBER 3598 080.71557 80 INSTALL 360 FEET OF 2 INCH POLY ALONG MILLER ROAD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL MELISSA GROWTH JULY 3599 080.71560 289,348 INSTALL 3,247 FEET OF 6 INCH POLY ALONG THE STREETS OF ERICKSON FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS KRUM GROWTH APRIL 3600 080.71563 6,598 INSTALL 2067 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER 3601 080.71564 (412) INSTALL 540 FEET OF 2 INCH POLY ALONG THE STREETS OF VILLAGE PARK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL BURLESON GROWTH MARCH 3602 080.71567 70,342 RELOCATE FACILITIES. INSTALL 500 FEET OF 4 INCH POLY AND ABANDON 4 INCH STEEL ALONG DOVE STREET ALL CUSTOMERS SOUTHLAKE RELOCATION OF FACILITIES SEPTEMBER 3603 080.71571 416 RELOCATE FACILITIES. INSTALL 625 FEET OF 4 INCH POLY AND ABANDON 375 FEET OF 3 INCH POLY ALONG WEST PARK COURT TO ACCOMMODATE CONSTRUCTION OF A MEDICAL CENTER. ALL CUSTOMERS EULESS RELOCATION OF FACILITIES SEPTEMBER 3604 080.71578 10,225 PURCHASE CAMERAS, MISCELLANEOUS IT, CABLING, SHELVING, AND ACCESS CONTROL ALONG CHISHOLM TRAIL. ALL CUSTOMERS SYSTEM WIDE STRUCTURES MARCH 3605 080.71579 8,542 ABANDON (10) DISTRICT REGULATOR STATIONS IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3606 080.71581 841 INSTALL 900 FEET OF 4 INCH AND 500 FEET OF 2 INCH POLY ALONG HIGHTOWER DRIVE. RESIDENTIAL NORTH RICHLAND HILLS GROWTH APRIL 3607 080.71584 19,838 RELOCATE FACILITIES. INSTALL 280 FEET OF 2 INCH, 137 FEET OF 4 INCH, 349 FEET OF 6 INCH AND 1698 FEET OF 8 INCH POLY ALONG KELLY LANE AND ABANDON 255 FEET OF 6 INCH, 1706 FEET OF 8 INCH AND 120 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF PFLUGERVILLE IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PFLUGERVILLE RELOCATION OF FACILITIES OCTOBER 3608 080.71585 961 INSTALL 5320 FEET OF 2 INCH, 1272 FEET OF 4 INCH POLY ALONG THE STREETS OF THE WILLOW WOOD SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH MARCH 3609 080.71588 366 INSTALL 2,629 FEET OF 2 INCH POLY AND 2,061 FEET OF 4 INCH POLY ALONG THE STREETS OF VENTANA SUBDIVISION. RESIDENTIAL FORT WORTH GROWTH JUNE 3610 080.71589 4,727 REPLACE DISTRICT REGULATOR STATION # 219 IN FORT WORTH AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3611 080.71591 3,990 RELOCATE FACILITIES. INSTALL 1080 FEET OF 2 INCH POLY AND ABANDON 965 FEET OF 3 INCH STEEL AND 40 FEET OF 2 INCH POLY ALONG WEST 11TH STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO RELOCATION OF FACILITIES OCTOBER 3612 080.71592 25,826 RELOCATE FACILITIES. INSTALL 1600 FEET OF 2 INCH AND 125 FEET OF 4 INCH POLY AND ABANDON 200 FEET OF 2 INCH STEEL AND 180 FEET OF 4 INCH STEEL AND 40 FEET OF 3 INCH STEEL ALONG BETSY DRIVE AND KARNES DRIVE TO ACCOMMODATE THE CITY OF ROBINSON DRAINAGE PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON RELOCATION OF FACILITIES OCTOBER 3613 080.71593 9,139 INSTALL 1,430 FEET OF 43 INCH AND 2,525 FEET OF 2 INCH POLY ALONG THE STREETS OF LYONS CREST. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GARLAND GROWTH SEPTEMBER 3614 080.71594 239 INSTALL 100 FEET OF 4 INCH AND 2800 FEET OF 2 INCH POLY ALONG THE STREETS OF BLUEBONNET ESTATES PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ENNIS GROWTH MARCH 3615 080.71600 281,014 INSTALL 3,982 FEET OF 6 INCH POLY ALONG CITY STREET. ALL CUSTOMERS MCKINNEY GROWTH SEPTEMBER 3616 080.71601 4,745 INSTALL 630 FEET OF 4 INCH POLY ALONG WEST CHESTNUT STREET AND SOUTH ARMSTRONG AVENUE AND ABANDON 167 FEET OF 4 INCH STEEL AND 134 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER 3617 080.71607 29,110 INSTALL 785 FEET OF 6 INCH POLY, 1430 FEET OF 4 INCH POLY AND 25 FEET OF 2 INCH POLY ALONG S. BROADWAY AND ABANDON 940 FEET OF 2 INCH STEEL AND 855 FEET OF 2 INCH POLY 300 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY OCTOBER 3618 080.71611 160 INSTALL 580 FEET OF 4 INCH POLY ALONG BICKER STREET. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL DALLAS GROWTH MARCH 3619 080.71620 119,997 INSTALL 2,200 FEET OF 4 INCH AND 1,705 FEET OF 2 INCH POLY ALONG THE STREETS OF WILDCATE RIDGE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GODLEY GROWTH OCTOBER 3620 080.71622 13,462 INSTALL 1200 FEET OF 6 INCH POLY ALONG AMBLER AND ABANDON 765 FEET OF 6 INCH STEEL, 353 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 3621 080.71627 3,139 INSTALL 185 FEET OF 4 INCH STEEL ALONG RENNER DRIVE. COMMERCIAL OR INDUSTRIAL RICHARDSON GROWTH DECEMBER 3622 080.71632 11,653 INSTALL 450 FEET OF 4 INCH AND 1871 FEET OF 2 INCH POLY ALONG FURLONG DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER 3623 080.71634 12,540 RELOCATE FACILITIES. INSTALL 1,100 FEET OF 2 INCH POLY AND ABANDON 1,100 FEET OF 2 INCH STEEL ALONG JORDAN DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES OCTOBER 3624 080.71635 8,790 INSTALL 1541 FEET OF 4 INCH POLY ALONG THE STREETS OF 3 CORNERS PLAZA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FRISCO GROWTH APRIL 3625 080.71639 427 INSTALL 556 FEET OF 2 INCH, 2077 FEET OF 6 INCH AND 1190 FEET OF 8 INCH POLY ALONG PRAIRIE PARKWAY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PROSPER GROWTH MARCH 3626 080.71643 89 INSTALL 365 FEET OF 2 INCH POLY FOR A NEW COMMERCIAL DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL KELLER GROWTH JANUARY 3627 080.71647 20,094 INSTALL 1600 FEET OF 2 INCH POLY ALONG THE ALLEY BETWEEN SPEEDWAY AND VICTORY AND ABANDON 1306 FEET OF 4 INCH STEEL, 22 FEET OF 3 INCH STEEL, 414 FEET OF 4 INCH POLY AND 7 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3628 080.71648 35,911 INSTALL 1200 FEET OF 2 INCH POLY IN THE ALLEY BETWEEN SPEEDWAY AVENUE AND ABANDON 1200 FEET OF 4 INCH STEEL AND 33 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 3629 080.71649 1 INSTALL 3725 FEET OF 2 INCH POLY ALONG THE STREETS OF SILVER OAKS. RESIDENTIAL MANSFIELD GROWTH JANUARY 3630 080.71654 11,701 INSTALL AND ABANDON DISTRICT REGULATOR STATION 1 IN MORAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MORAN SYSTEM INTEGRITY OCTOBER 3631 080.71658 (27) INSTALL 5224 FEET OF 6 INCH POLY ALONG HIGHWAY 190. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS COPPERAS COVE GROWTH MARCH 3632 080.71659 1 INSTALL 927 FEET OF 4 INCH POLY ALONG CHARLES TILLMAN WAY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL COPPERAS COVE GROWTH JANUARY 3633 080.71664 17,691 INSTALL 2495 FEET OF 4 INCH POLY ALONG THE ABILENE FIRE TRAINING FACILITY AND ABANDON 2256 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 3634 080.71665 221,799 INSTALL 7,494 FEET OF 8 INCH POLY ALONG STERLITE STREET. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL ENNIS GROWTH OCTOBER 3635 080.71673 (8) INSTALL 8 FEET OF 6 INCH STEEL AND ABANDON 8 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3636 080.71674 254 RELOCATE FACILITIES. INSTALL 500 FEET OF 4 INCH POLY AND ABANDON 500 FEET OF 4 INCH POLY ALONG STREETS OF EDWARDS CHURCH. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MESQUITE RELOCATION OF FACILITIES JUNE MTX Additions Page 111 of 178 330 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3637 080.71679 5,823 RELOCATE FACILITIES. INSTALL 160 FEET OF 4 INCH POLY AND ABANDON 20 FEET OF 4 INCH POLY AND 120 FEET OF 4 INCH STEEL ALONG THOMAS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON RELOCATION OF FACILITIES OCTOBER 3638 080.71680 284 INSTALL 1400 FEET OF 2 INCH POLY ALONG THE STREETS OF GREENS PRAIRIE RESERVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH JUNE 3639 080.71684 9,141 RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY ALONG EAST OAK STREET AND ABANDON 80 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 3640 080.71685 9,363 INSTALL 2920 FEET OF 4 INCH POLY ALONG LIPAN DRIVE. ALL CUSTOMERS LIPAN SYSTEM IMPROVEMENT JUNE 3641 080.71687 199,210 INSTALL 4000 FEET OF 6 INCH POLY ALONG HOUSTON STREET. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ANNA GROWTH SEPTEMBER 3642 080.71688 4,258 INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION 134 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3643 080.71695 288 INSTALL 2075 FEET OF 6 INCH POLY ALONG STREETS OF MERRITT. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS SACHSE GROWTH JULY 3644 080.71700 34,572 INSTALL 3,553 FEET OF 8 INCH, 1,801 FEET OF 6 INCH, 3,814 FEET OF 4 INCH, AND 2,827 FEET OF 2 INCH POLY ALONG THE STREETS OF PARKSIDE ON THE RIVER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL UNINCORPORATED GROWTH OCTOBER 3645 080.71701 13,119 RELOCATE FACILITIES. INSTALL 860 FEET OF 6 INCH AND 30 FEET OF 2 INCH POLY ALONG BOSQUE BOULEVARD AND ABANDON 860 FEET OF 6 INCH STEEL AND 30 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF WACO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 3646 080.71702 19,237 RELOCATE FACILITIES. INSTALL 2394 FEET OF 4 INCH AND 2 INCH POLY ALONG PALASOTA DRIVE AND ABANDON 1933 FEET OF 2 INCH POLY AND 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES OCTOBER 3647 080.71703 272,398 RELOCATE FACILITIES.&NBSP; INSTALL 1600 FEET OF 4 INCH AND 345 FEET OF 2 INCH POLY ALONG PALASOTA DRIVE AND ABANDON 1200 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY JULY 3648 080.71709 2 INSTALL 350 FEET OF 4 INCH POLY ALONG TEXAS HEALTH CENTER FOR WOMEN. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL DENTON GROWTH JANUARY 3649 080.71710 50,274 RELOCATE FACILITIES. INSTALL 1977 FEET OF 2 INCH POLY ALONG GRIFFIN STREET AND PINE STREET AND ABANDON 1473 FEET OF 2 INCH POLY AND 591 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF MCKINNEY IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY RELOCATION OF FACILITIES OCTOBER 3650 080.71711 582 INSTALL 1276 FEET OF 8 INCH, 2728 FEET OF 4 INCH AND 6237 FEET OF 2 INCH POLY ALONG TUFFINO AVENUE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH MARCH 3651 080.71716 1,570,587 INSTALL 4,350 FEET OF 2 INCH, 1,200 FEET OF 4 INCH, 620 FEET OF 6 INCH, AND 400 FEET OF 4 INCH POLY ALONG THE STREET OF HALBERT STREET AND ABANDON DISTRICT REGULATOR STATION# 429, 2,950 FEET OF 4 INCH 1,615 FEET OF 3 INCH STEEL, 315 FEET OF 4 INCH, 60 FEET OF 2 INCH AND 1,100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 3652 080.71717 12,616 INSTALL 5,920 FEET OF 2 INCH POLY ALONG THE STREETS OF MAYFIELD FARMS SUBDIVISION IN ARLINGTON, TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARLINGTON GROWTH DECEMBER 3653 080.71719 52,459 RELOCATE FACILITIES. INSTALL 54 POLY SERVICES AND ABANDON 54 POLY AND STEEL SERVICES TO ACCOMMODATE ARLINGTON CITY STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES DECEMBER 3654 080.71728 3,115 INSTALL DISTRICT REGULATOR STATION 425 ALONG THE STREETS OF BRENTWOOD STAIR ROAD AND HOLLOWBROOK COURT AND ABANDON DISTRICT REGULATOR STATION 425 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3655 080.71733 951 INSTALL 2935 FEET OF 2 INCH AND 1810 FEET OF 4 INCH POLY ALONG THE STREETS OF THE BRETTON WOODS SUBDIVISION. RESIDENTIAL FRISCO GROWTH DECEMBER 3656 080.71737 25,901 RELOCATE FACILITIES. INSTALL 447 FEET OF 4 INCH POLY ALONG ESTATE LANE AND ABANDON 422 FEET OF 3 INCH POLY TO ACCOMMODATE TXDOT PROJECT. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES AUGUST 3657 080.71738 51,608 INSTALL 3615 FEET OF 4 INCH AND 550 FEET OF 2 INCH POLY ALONG EDGEWOOD TERRACE AND ABANDON 3300 FEET OF 4 INCH POLY AND 1060 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3658 080.71744 374 INSTALL 200 FEET OF 2 INCH POLY ALONG AIRPORT FREEWAY. ALL CUSTOMERS IRVING GROWTH MARCH 3659 080.71747 2,856 INSTALL 1797 FEET OF 2 INCH POLY ALONG LOST CREEK CIRCLE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LONGVIEW GROWTH JUNE 3660 080.71755 (1,974,925) RELOCATE FACILITIES. INSTALL 399 FEET OF 10 INCH STEEL AND 1996 FEET OF 6 INCH POLY, 159 FT OF 4 INCH POLY AND 145 FEET OF 2 INCH POLY ALONG I-35 RELOCATION AND ABANDON 403 FEET OF 10 INCH STEEL AND 2633 FEET OF POLY TO ACCOMMODATE TXDOT IMPROVEMENT PROJECT. ALL CUSTOMERS GAINESVILLE RELOCATION OF FACILITIES DECEMBER 3661 080.71758 216,980 INSTALL 1,670 FEET OF 4 INCH AND 3,265 FEET OF 2 INCH POLY ALONG THE STREETS OF WINDRIDGE SUBDIVISION. DEVLEOPER INSTALLED FACILITIES. RESIDENTIAL MIDLOTHIAN GROWTH SEPTEMBER 3662 080.71759 5,797 INSTALL 675 FEET OF 2 INCH AND 1240 FEET OF 4 INCH POLY ALONG STREETS OF NORTHGATE COMMERCIAL. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL DENTON GROWTH JUNE 3663 080.71760 54,347 RELOCATE FACILITIES. INSTALL 2603 FEET OF 8 INCH, 2891 FEET OF 4 INCH AND 720 FEET OF 2 INCH POLY AND ABANDON 747 FEET OF 8 INCH, 1689 FEET OF 6 INCH, 985 FEET OF 4 INCH, 1404 FEET OF 3 INCH, 107 FEET OF 2 INCH STEEL, 10 FEET OF 4 INCH POLY AND 439 FEET OF 3 INCH POLY ALONG HARBIN STREET TO ACCOMMODATE THE CITY OF STEPHENVILLE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE RELOCATION OF FACILITIES OCTOBER 3664 080.71761 25,179 INSTALL 4,140 FEET OF 2 INCH AND 675 FEET OF 6 INCH POLY ALONG THE STREETS OF CAMBRIDGE BROOK SUBDIVISION IN DENTON, DENTON COUNTY. RESIDENTIAL DENTON GROWTH DECEMBER 3665 080.71762 16,122 INSTALL 2550 FEET OF 2 INCH POLY AND ABANDON 3530 FEET OF 1.25 INCH STEEL TO ACCOMMODATE ROAD ROW IN THE CITY OF KELLER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY OCTOBER 3666 080.71763 451,854 INSTALL 3,995 FEET OF 6 INCH POLY ALONG MOCKINGBIRD LANE IN MIDLOTHIAN. ALL CUSTOMERS MIDLOTHIAN GROWTH SEPTEMBER 3667 080.71768 17,814 INSTALL 8 FEET OF 6 INCH STEEL AND ABANDON 8 FEET OF 6 INCH ALONG IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3668 080.71773 802,019 INSTALL 2,140 FEET OF 2 INCH, 1,600 FEET OF 4 INCH, AND 800 FEET OF 6 INCH POLY ALONG THE STREETS OF 13TH AND 15TH AND ABANDON 1,300 FEET OF 2 INCH, 1,250 FEET OF 4 INCH, 100 FEET OF 3 INCH POLY AND 340 FEET OF 2 INCH, 800 FEET OF 6 INCH, 550 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY DECEMBER 3669 080.71775 815,004 INSTALL 1,862 FEET OF 8 INCH POLY ALONG INDUSTRIAL BOULEVARD. ALL CUSTOMERS CROWLEY GROWTH SEPTEMBER 3670 080.71779 471,040 INSTALL 3,390 FEET OF 6 INCH, 4,417 FEET OF 4 INCH AND 4,267 FEET OF 2 INCH POLY ALONG THE STREETS OF HUNTERS RIDGE SUBDIVISION. RESIDENTIAL CROWLEY GROWTH JUNE 3671 080.71786 67,591 INSTALL 1,580 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKESIDE SUBDIVISION. DEVELOPOR INSTALLED FACILITIES. RESIDENTIAL GRAND PRAIRIE GROWTH JUNE 3672 080.71797 (34) INSTALL 2546 OF 6 INCH AND 465 FEET OF 4 INCH POLY ALONG STREETS OF 46 RANCH COMMERCIAL. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH JANUARY 3673 080.71800 568 INSTALL 1438 FEET OF 8 INCH 2512 FEET OF 4 INCH AND 4171 FEET OF 2 INCH POLY ALONG THE STREETS OF BAR W RANCH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH MARCH 3674 080.71801 267 INSTALL 2150 FEET OF 2 INCH POLY ALONG THE STREETS OF NEW COLBY CROSSING SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANSFIELD GROWTH APRIL MTX Additions Page 112 of 178 331 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3675 080.71804 (131) INSTALL 340 FEET OF 6 INCH, 3321 FEET OF 4 INCH AND 1530 FEET OF 2 INCH POLY ALONG RONALD REAGAN AND KAUFMAN LOOP. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL LEANDER GROWTH JANUARY 3676 080.71805 370,369 INSTALL 1,480 FEET OF 4 INCH AND 1,020 FEET OF 2 INCH POLY ALONG THE STREETS OF CHAMBERLAND AVENUE AND ABANDON 400 FEET OF 4 INCH, AND 1,300 FEET OF 2 INCH STEEL AND 800 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EMHOUSE SYSTEM INTEGRITY DECEMBER 3677 080.71807 320 INSTALL 1,621 FEET OF 4 INCH POLY ALONG SOFIA PLACE. ALL CUSTOMERS ROUND ROCK GROWTH MARCH 3678 080.71809 2,181 INSTALL ISOLATION VALVE ALONG WEST FRENCH STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER 3679 080.71810 (58) INSTALL 2167 FEET OF 2 INCH POLY ALONG THE STREETS OF SUN CITY SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH JANUARY 3680 080.71811 19,598 INSTALL 1,974 FEET OF 6 INCH, 1,162 FEET OF 4 INCH AND 2,603 FEET OF 2 INCH POLY ALONG THE STREETS OF TRES TIERRA. DEVELOP INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH JUNE 3681 080.71817 16,961 RELOCATE FACILITIES. INSTALL 2470 FEET OF 4 INCH POLY ALONG ONEIL, WASHINGTON, HUBBARD AND SHANKLE STREETS AND ABANDON 1227 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF ALVORD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALVORD RELOCATION OF FACILITIES OCTOBER 3682 080.71819 783 INSTALL 344 FEET OF 6 INCH, 1181 FEET OF 4 INCH AND 2376 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLE CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH MARCH 3683 080.71823 8,157 RELOCATE FACILITIES. INSTALL 400 FEET OF 2 INCH AND 200 FEET OF 4 INCH POLY ALONG STAUNTON DRIVE AND SOUTHSIDE DRIVE AND ABANDON 200 FEET OF 2 INCH POLY, 200 FEET OF 2 INCH AND 200 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES OCTOBER 3684 080.71830 3,652 INSTALL ISOLATION VALVE ALONG NORTH MAIN STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER 3685 080.71832 1,889,019 RELOCATE FACILITIES. INSTALL 4,100 FEET OF 8 INCH POLY ALONG HIGHWAY 287 AND ABANDON 3.060 FEET OF 6 INCH POLY, AND 370 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY NOVEMBER 3686 080.71835 22,562 INSTALL 970 FEET OF 2 INCH POLY ALONG THE STREETS OF HERITAGE MEADOWS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH SEPTEMBER 3687 080.71836 8,348 RELOCATE FACILITIES. INSTALL 850 FEET OF 2 INCH POLY AND ABANDON 840 FEET OF 2 INCH STEEL SERVICES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER 3688 080.71838 5,853 RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY ALONG CARROLL DRIVE AND ABANDON 495 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER 3689 080.71839 12,217,075 INSTALL 83,000 FEET (16 MILES) OF 6 INCH, 100 FEET OF 4 INCH, 3,000 FEET OF 2 INCH POLY AND 8 DISTRICT REGULATOR STATIONS ALONG LINE E16 IN PARIS AND ABANDON 44,455 FEET OF 8 INCH, 42,425 FEET OF 4 INCH, 300 FEET OF 6 INCH, 175 FEET OF 3 INCH STEEL AND 325 FEET OF 8 INCH POLY AND 8 MAIN LINE REGULATOR STATIONS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY DECEMBER 3690 080.71849 109,535 INSTALL 8 INCH STEEL ALONG LINE K3 AND ABANDON 6,000 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GODLEY SYSTEM INTEGRITY OCTOBER 3691 080.71850 156,126 REPLACE 5.7 MILES OF 3 INCH STEEL WITH 4 INCH STEEL ALONG LINE L8AE1 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BUFFALO SYSTEM INTEGRITY OCTOBER 3692 080.71852 253,693 INSTALL 1620 FEET OF 8 INCH , 217 FEET OF 6 INCH, 2210 FEET OF 4 INCH AND 9183 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH SEPTEMBER 3693 080.71855 890 INSTALL 615 FEET OF 4 INCH POLY ALONG HIGHWAY 67 AND ABANDON 250 FEET OF 2 INCH POLY. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JUNE 3694 080.71856 1,161,127 INSTALL 3200 FEET OF 6 INCH, 100 FEET OF 2 INCH POLY AND 3.2 MILES OF 12 INCH STEEL ALONG LINE 028 AND ABANDON 3.2 MILES OF 3.5 INCH STEEL AND MAIN LINE REGULATOR 42 AND 15 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT SYSTEM INTEGRITY DECEMBER 3695 080.71857 57,062 INSTALL 750 FEET OF 4 INCH AND 2500 FEET OF 2 INCH POLY ALONG EAST ROYALL BLVD AND RETIRE 645 FEET OF 6 INCH AND 2230 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MALAKOFF SYSTEM INTEGRITY OCTOBER 3696 080.71865 209,517 INSTALL 1500 FEET OF 16 INCH STEEL AND ABANDON 1500 FEET OF 16 INCH STEEL ALONG MEACHAM BOLUVARD TO ACCOMODATE HALTOM CITY PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY DECEMBER 3697 080.71869 11 INSTALL 2631 FEET OF 2 INCH AND 948 FEET OF 6 INCH POLY ALONG THE STREETS OF DEERBROOKE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH MARCH 3698 080.71870 3,503 INSTALL 3450 FEET OF 2 INCH POLY ALONG THE STREETS OF DEEBROOKE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JUNE 3699 080.71875 4,988 INSTALL 925 FEET OF 2 INCH POLY AND ABANDON 735 FEET OF 2 INCH POLY, 177 FEET OF 2 INCH STEEL ALONG JACKSBORO HWY-DITTO LANE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3700 080.71878 4,317 INSTALL ISOLATION VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER 3701 080.71882 15,036 INSTALL 1250 FEET OF 2 INCH POLY AND 40 FEET OF 4 INCH POLY ALONG RANDOLPH STEET AND ABANDON 1290 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER 3702 080.71884 193,831 INSTALL DISTRICT REGULATOR STATION #03 ALONG THE STREETS OF GRANBURY AND ABANDON DISTRICT REGULATOR STATION #03 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY APRIL 3703 080.71892 3,328,742 INSTALL 1,769 FEET OF 20 INCH STEEL AND ABANDON 1,449 FEET OF 20 INCH STEEL ALONG LBJ AND MCCREE ROAD TO ACCOMODATE THE TXDOT-DRIVEN IH635 IMPROVEMENTS PROJECT IN GARLAND, DALLAS COUNTY. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES DECEMBER 3704 080.71894 1,533,888 INSTALL DISTRICT REGULATOR STATION, 2,057 FEET OF 2 INCH, 1,708 FEET OF 4 INCH, 194 FEET OF 6 INCH POLY AND 81 FEET OF 10 INCH, 254 FEET OF 8 INCH, AND 51 FEET OF 4 INCH STEEL CASING ALONG THE STREET NORTH ALLEY AND NASH AND ABANDON 2,936 FEET OF 6 INCH, 300 FEET OF 4 INCH, 126 FEET OF 3 INCH, AND 103 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY DECEMBER 3705 080.71900 60,553 RELOCATE FACILITIES. INSTALL 9500 FEET OF 2 INCH POLY AND ABANDON 1500 FEET OF 1 1/4 INCH, 3300 FEET OF 2 INCH, 700 FEET OF 3 INCH, AND 2550 FEET OF 4 INCH POLY ALONG ALMOND DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS MANSFIELD RELOCATION OF FACILITIES OCTOBER 3706 080.71902 919 INSTALL 1470 FEET OF 2 INCH POLY ALONG HIDDEN VISTA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BURLESON GROWTH JULY 3707 080.71903 20,084 RELOCATE FACILITIES. INSTALL 2600 FEET OF 6 INCH POLY AND 350 FEET OF 2 INCH POLY ALONG STREETS OF ROYSE CITY AND ABANDON 2590 FEET OF 6 INCH POLY AND 340 FEET OF 2 INCH POLY TO ACCOMMODATE GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROYSE CITY RELOCATION OF FACILITIES OCTOBER 3708 080.71905 11,647 INSTALL 1230 FEET OF 2 INCH POLY AND ABANDON 764 FEET 2 INCH STEEL, 438 FEET OF 3 INCH STEEL, 361 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 72 ALONG STURGIS ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 3709 080.71907 177,725 INSTALL 300 FEET OF 6 INCH POLY ALONG WEST PIPELINE AND CHATEAU VALEE IN EULESS AND ABANDON 261 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 113 of 178 332 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3710 080.71909 168,044 INSTALL 530 FEET OF 6 INCH AND 10 FEET OF 2 INCH POLY ALONG WEST PIPELINE AND COLUMBUS IN BEDFORD AND ABANDON 516 FEET OF 6 INCH STEEL AND 10 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEDFORD SYSTEM INTEGRITY OCTOBER 3711 080.71910 98,343 INSTALL 325 FEET OF 6 INCH, 10 FEET OF 4 INCH POLY ALONG WEST PIPELINE AND GETTYSBURG IN BEDFORD AND ABANDON 284 FEET OF 6 INCH AND 10 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEDFORD SYSTEM INTEGRITY DECEMBER 3712 080.71915 2,665 RELOCATE FACILITIES. INSTALL 90 FEET OF 2 INCH POLY AND ABANDON 90 FEET OF 2 INCH POLY ALONG W BAILEY BOSWELL AND OLD DECATUR TO ACCOMMODATE CITY OF SAGINAW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW RELOCATION OF FACILITIES OCTOBER 3713 080.71919 12,960 INSTALL 1250 FEET OF 4 INCH POLY AND 1120 FEET OF 2 INCH POLY ALONG WRIGHT AND ABANDON 875 FEET OF 3 INCH STEEL, 400 FEET OF 2 INCH STEEL AND 600 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERENS SYSTEM INTEGRITY OCTOBER 3714 080.71921 28,539 RELOCATE FACILITIES. INSTALL 1230 FEET OF 2 INCH POLY AND 2015 FEET OF 4 INCH POLY AND ABANDON 2747 FEET OF 2 INCH STEEL ALONG STARK STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3715 080.71922 6,430 INSTALL AND ABANDON DISTRICT REGULATOR STATION 02 IN TRENT IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS TRENT SYSTEM INTEGRITY OCTOBER 3716 080.71923 3,451 RELOCATE FACILITIES. INSTALL 460 FEET OF 2 INCH POLY ALONG BEHRENS ROAD AND ABANDON 450 FEET 2 INCH POLY TO ACCOMMODATE CITY OF COLLEYVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE RELOCATION OF FACILITIES OCTOBER 3717 080.71931 71,286 INSTALL 1100 FEET OF 8 INCH STEEL ALONG LINE L2ND AND ABANDON 1100 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY OCTOBER 3718 080.71932 27,923 INSTALL 675 FEET OF 6 INCH AND 520 FEET OF 2 INCH POLY ALONG COLLINS STREET. DEVELOP INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL ARLINGTON GROWTH SEPTEMBER 3719 080.71933 31,838 INSTALL 7700 FEET OF 8 INCH STEEL ALONG IH35. ALL CUSTOMERS GEORGETOWN SYSTEM IMPROVEMENT JULY 3720 080.71937 1,937 INSTALL 4980 FEET OF 2 INCH POLY ALONG THE STREETS OF THE GREENS AT LEGACY SUBDIVISION. RESIDENTIAL PROSPER GROWTH APRIL 3721 080.71938 288 INSTALL 135 FEET OF 2 INCH AND 245 FEET OF 4 INCH POLY ALONG DENTON WESTPARK COMMERCIAL. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL DENTON GROWTH JUNE 3722 080.71940 11,285 INSTALL 1,675 FEET OF 2 INCH AND 2,875 FEET OF 4 INCH POLY ALONG THE STREETS OF WILDRIDGE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL OAK POINT GROWTH APRIL 3723 080.71942 349 INSTALL 3027 FEET OF 2 INCH POLY ALONG THE STREETS OF THE HILLS OF LEGACY SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PROSPER GROWTH JUNE 3724 080.71943 224,844 INSTALL 16,655 FEET OF 4 INCH STEEL AND ABANDON 16,655 FEET OF 4 INCH STEEL ALONG THE STREETS OF GAINESVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS GAINESVILLE SYSTEM INTEGRITY OCTOBER 3725 080.71944 15,504 INSTALL 2300 FEET OF 2 INCH POLY AND ABANDON 2030 FEET OF 2 INCH STEEL AND 490 FEET OF 3 INCH STEEL ALONG LOOM STREET AND SHUTTLE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ITASCA SYSTEM INTEGRITY OCTOBER 3726 080.71948 61,702 INSTALL 4500 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 323, 2000 FEET OF 4 INCH STEEL AND 2500 FEET OF 4 INCH POLY ALONG EAST BEKNAP STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3727 080.71950 11,627 INSTALL 5 FEET OF 8 INCH POLY AND 70 FEET OF 4 INCH POLYE ALONG GLENVILLE DRIVE AND ABANDON 5 FEET OF 8 INCH AND 60 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY OCTOBER 3728 080.71951 111,120 INSTALL 8585 FEET OF 4 INCH STEEL AND ABANDON 8585 FEET OF 4 INCH STEEL ALONG THE STREETS OF GAINESVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS MYRA SYSTEM INTEGRITY DECEMBER 3729 080.71952 61,261 RELOCATE FACILITIES. INSTALL 1200 FEET OF 6 INCH AND 120 FEET OF 4 INCH POLY AND ABANDON 1050 FEET OF 6 INCH AND 100 FEET OF 4 INCH POLY ALONG CANTRELL SANSOM TO ACCOMMODATE THE CITY OF FORT WORTH IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3730 080.71954 (81) INSTALL 20 FEET OF 6 INCH POLY ALONG LAKESIDE PARKWAY. ALL CUSTOMERS COPPELL SYSTEM IMPROVEMENT MARCH 3731 080.71955 1,718 INSTALL 250 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 14 AND 400 FEET OF 4 INCH STEEL AND 280 FEET OF 2 INCH STEEL ALONG CHAMBERS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER 3732 080.71956 416,827 RELOCATE FACILITIES. INSTALL 156 FEET OF 2 INCH AND 1,616 FEET OF 4 INCH POLY ALONG COLORADO STREET AND ABANDON 558 FEET OF 2 INCH AND 250 FEET OF 4 INCH POLY AND 416 FEET OF 3 INCH STEEL IN COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA SYSTEM INTEGRITY DECEMBER 3733 080.71960 18,420 INSTALL 3025 FEET OF 2 INCH POLY ALONG EAST HARRISON STREET AND SHERMAN STREET AND ABANDON 100 FEET OF 1.5 INCH STEEL, 747 FEET OF 3 INCH STEEL, 1477 FEET OF 4 INCH STEEL, 37 FEET OF 3 INCH POLY, 100 FEET OF 4 INCH LP POLY AND DISTRICT REGULATOR STATION 02 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA SYSTEM INTEGRITY OCTOBER 3734 080.71962 24,196 INSTALL 450 FEET OF 2 INCH POLY AND 2160 FEET OF 4 INCH POLY ALONG NORTH CENTRAL STREET AND ABANDON 1999 FEET OF 3 INCH STEEL, 275 FEET OF 3 INCH POLY AND DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA SYSTEM INTEGRITY DECEMBER 3735 080.71964 66,321 INSTALL 530 FEET OF 2 INCH POLY ALONG COUNTS BOULEVARD RESIDENTIAL DALLAS GROWTH OCTOBER 3736 080.71965 174 REPLACE THE OUTLET RELIEF VALVE ON THE MILES CITY GATE STATION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILES SYSTEM INTEGRITY OCTOBER 3737 080.71967 5,747 REPLACE DISTRICT REGULATOR STATION #21 IN SNDYER AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER 3738 080.71968 732 INSTALL 4943 FEET OF 2 INCH POLY ALONG THE STREETS OF THE STAR TRAIL SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PROSPER GROWTH APRIL 3739 080.71969 (51,222) RELOCATE FACILITIES. INSTALL TWO 6 INCH ISOLATION VALVE, 10 INCH MAINLINE VALAVE, 80 FEET OF 16 INCH STEEL AND ABANDON 80 FEET OF 16 INCH STEEL ALONG THE STREETS OF ARLINGTON. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES MAY 3740 080.71971 16,410 RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH POLY AND RETIRE 300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 3741 080.71975 34,888 INSTALL 400 FEET OF 2 INCH STEEL AND ABANOND 400 FEET OF 2 INCH STEEL ALONG LINE U9-1 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS MUNDAY SYSTEM INTEGRITY OCTOBER 3742 080.71976 14,726 INSTALL 1620 FEET OF 2 INCH POLY AND ABANDON 1581 FEET OF 2 INCH STEEL, 120 FEET 2 INCH STEEL, 166 FEET 2 INCH POLY ALONG WITT STREET AND HATTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 3743 080.71978 (16,193) RELOCATE FACILITES. INSTALL 103 FEET OF 4 INCH POLY AND ABANDON 101 FEET OF 3 INCH POLY ALONG GALLERIA DRIVE TO ACCOMODATE UNION PACIFIC RAILROAD EXTENSION PROJECT. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES MARCH 3744 080.71982 435,245 INSTALL 1,407 FEET OF 8 INCH AND 10 FEET OF 2 INCH POLY ALONG MT. ZION ROAD AND ABANDON 1,330 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY SEPTEMBER 3745 080.71993 204,405 INSTALL 26,498 FEET OF 4 INCH STEEL AND ABANDON 26,498 FEET OF 3 INCH STEEL ALONG JOE REEVES ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY OCTOBER MTX Additions Page 114 of 178 333 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3746 080.71995 3,640 INSTALL 350 FEET OF 2 INCH POLY ALONG WEST RICE AND RETIRE 275 FEET OF 3 INCH CAST IRON AND 90 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER 3747 080.71996 288 INSTALL 1,730 FEET OF 4 INCH AND 1830 FEET OF 2 INCH POLY ALONG STREETS OF SUN WEST ADDITION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WACO GROWTH JUNE 3748 080.71998 16,873 INSTALL 2040 FEET OF POLY ALONG FRANCHER STREET AND ABANDON 2070 FEET OF STEEL AND DRS19 IN ACCORDANCE WITH TEXAS RAILROAD OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 3749 080.71999 1,941,715 INSTALL 3,650 FEET OF 4 INCH, 7,750 FEET OF 2 INCH POLY ALONG DAVIS STREET IN CLEBURNE AND ABANDON 8,085 FEET OF 4 INCH, 1,540 FEET OF 2 INCH STEEL AND 520 FEET OF 4 INCH, 825 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY DECEMBER 3750 080.72000 46,139 RELOCATE FACILITIES. INSTALL 2397 FEET OF 6 INCH, 721 FEET OF 2 INCH POLY AND ABANDON 424 FEET OF 2 INCH, 2278 FEET OF 6 INCH ALONG SOUTH COOPER STREET TO ACCOMMODATE THE CITY OF ARLINGTION IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 3751 080.72001 662,837 REPLACE DALLAS CENTRAL STATION ALONG THE STREETS OF IRVING IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER 3752 080.72002 7,918 INSTALL 770 FEET OF 4 INCH POLY 110 FEET OF 2 INCH POLY ALONG JACKSON STREET AND ABANDON 770 FEET OF 4 INCH STEEL AND 110 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY OCTOBER 3753 080.72011 29,994 RELOCATE FACILITIES. INSTALL 2100 FEET OF 2 INCH POLY AND ABANDON 1285 FEET OF 2 INCH STEEL ALONG REDBUD TO ACCODATE THE CITY OF GARLAND IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER 3754 080.72012 22,179 RELOCATE FACILITIES. INSTALL 45 FEET OF 2 INCH POLY AND 85 FEET OF 6 INCH POLY ALONG GARAPAN DRIVE AND ABANDON 45 FEET OF 2 INCH POLY AND 85 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 3755 080.72014 9 INSTALL 250 FEET OF 2 INCH POLY ALONG WALKER STREET. RESIDENTIAL DENISON GROWTH JANUARY 3756 080.72015 22,067 INSTALL 3425 FEET OF 2 INCH POLY ALONG THE WALNUT HILL LANE AND KINGSWAY AVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DALLAS GROWTH DECEMBER 3757 080.72019 4,833 INSTALL 144 FEET OF 4 INCH POLY ALONG THE STREETS OF SUNDANCE RETAIL. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL GEORGETOWN GROWTH OCTOBER 3758 080.72035 3,641 INSTALL 1000 FEET OF 2 INCH POLY AND ABANDON 950 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 15 ALONG WATERS COURT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER 3759 080.72036 107,780 INSTALL 750 FEET OF 2 INCH POLY AND 3100 FEET OF 4 INCH POLY AND ABANDON 530 FEET OF 4 INCH POLY, 4765 FEET OF 4 INCH STEEL, 475 FEET OF 6 INCH POLY, 2620 FEET OF 6 INCH STEEL, 40 FEET OF 6 INCH CAST IRON AND 170 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3760 080.72039 55,025 RELOCATE FACILITIES. INSTALL 5350 FEET OF 8 INCH, 425 FEET OF 4 INCH, AND 255 FEET OF 2 INCH POLY AND ABANDON 4115 FEET OF 4 INCH STEEL, 1555 FEET OF 4 INCH, 60 FEET OF 3 INCH, AND 50 FEET OF 2 INCH POLY ALONG CEDAR HILL SOUTH CLARK TRAIL TO ACCOMMODATE THE CITY OF DESOTO IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS CEDAR HILL RELOCATION OF FACILITIES OCTOBER 3761 080.72044 46,577 INSTALL 300 FEET OF 12 INCH STEEL AND ABANDON 300 FEET OF 12 INCH STEEL ALONG DUNCAN STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 3762 080.72045 431,604 INSTALL 300 FEET OF 12 INCH STEEL ALONG UNION STREET AND ABANDON 300 FEET OF 12 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER 3763 080.72048 8,341 INSTALL 40 FEET OF 4 INCH AND 1,590 FEET OF 2 INCH POLY ALONG STREETS OF SAVOY AND ABANDON 32 FEET OF 3 INCH, 274 FEET OF 2 INCH, 1,400 FEET OF 3 INCH STEEL AND 291 FEET OF 2 INCH POLY, 95 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAVOY SYSTEM INTEGRITY OCTOBER 3764 080.72049 9,208 INSTALL 757 FEET OF 6 INCH POLY AND ABANDON 717 FEET OF 6 INCH POLY ALONG AIRFIELD DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER 3765 080.72057 3,752 INSTALL DISTRICT REGULATOR STATION 03 AND ABANDON DISTRICT REGULATOR STATION 03 ALONG THE STREETS OF SOUTHWESTERN ADVENTIST UNIVERSITY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS KEENE SYSTEM INTEGRITY OCTOBER 3766 080.72058 6,123 RELOCATE FACILITIES. INSTALL 385 FEET OF 2 INCH POLY IN EASEMENT BEHIND 211 EAST MAIN STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG RELOCATION OF FACILITIES OCTOBER 3767 080.72063 4,299 INSTALL DISTRICT REGULATOR STATION 01 AND ABANDON DISTRICT REGULATOR STATION 01 ALONG NORTH MAIN STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS JOSHUA SYSTEM INTEGRITY OCTOBER 3768 080.72068 2,130 RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH POLY AND ABANDON 300 FEET OF 2 INCH POLY AT JETER AND JAMESTOWN IN THE CITY OF ENNIS THAT IS IN CONFLICT WITH A CITY OF ENNIS SEWER PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS RELOCATION OF FACILITIES OCTOBER 3769 080.72074 9,047 RELOCATE FACILITIES. INSTALL 277 FEET OF 4 INCH POLY AND 419 FEET OF 6 INCH POLY ALONG JUPITER ROAD AND KINGSLEY ROAD AND ABANDON 1327 FEET OF 8 INCH STEEL TO ACCOMMODATE TXDOT IMPROVEMENT PROJECT. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES DECEMBER 3770 080.72075 9,146 RELOCATE FACILITIES. INSTALL 510 FEET OF 4 INCH POLY AND RETIRE 500 FEET OF 4 INCH STEEL AND 115 FEET 2 INCH STEEL ALONG CENTRAL TEXAS PARKWAY TO ACCOMMODATE CITY OF WACO STREET PROOJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 3771 080.72077 2,412 INSTALL 4,550 FEET OF 2 INCH POLY ALONG STREETS OF MAGNOLIA MEADOWS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GLENN HEIGHTS GROWTH MARCH 3772 080.72078 1,508 RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH POLY AND ABANDON 65 FEET OF 6 INCH POLY ALONG CESAR CHAVEZ TO ACCOMMODATE A WASTEWATER CONFLICT FOR THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 3773 080.72082 1,683 RELOCATE FACILITIES. INSTALL 250 FEET OF 2 INCH POLY AND ABANDON 150 FEET OF 2 INCH POLY ALONG PRIVATE DRIVE IN NORTH RICHLAND HILLS, TX. ALL CUSTOMERS NORTH RICHLAND HILLS RELOCATION OF FACILITIES APRIL 3774 080.72085 100,309 RELOCATE FACILITIES. INSTALL 922 FEET OF 6 INCH POLY, 3601 FEET OF 4 INCH POLY AND 597 FEET OF 2 INCH POLY AND ABANDON 2070 FEET OF 6 INCH STEEL, 2390 FEET OF 4 INCH STEEL AND 449 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF IRVING STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 3775 080.72099 24,231 RELOCATE FACILIITES.&NBSP; INSTALL 85 FEET OF 6 INCH POLY ALONG BELTLINE AND ABANDON 55 FEET OF 6 INCH POLY IN ACCORDDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO SYSTEM INTEGRITY SEPTEMBER 3776 080.72103 96,067 INSTALL ONE (1) 8 INCH TAP ON 12 STEEL ALONG 01 IN LANCASTER. ALL CUSTOMERS WILMER SYSTEM IMPROVEMENT OCTOBER 3777 080.72109 66,703 INSTALL 3,950 FEET OF 4 INCH POLY ALONG THE STREETS OF FORT WORTH. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER 3778 080.72111 534 INSTALL 3250 FEET OF 2 INCH POLY AND 3500 FEET OF 8 INCH POLY ALONG THE STREETS OF OAKMONT SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH APRIL 3779 080.72116 4,323 INSTALL 1083 FEET OF 2 INCH POLY ALONG BELLA CHARCA PARKWAY. RESIDENTIAL NOLANVILLE GROWTH DECEMBER 3780 080.72119 244,915 INSTALL 5,575 FEET OF 2 INCH AND 1,170 FEET OF 4 INCH POLY ALONG THE STREETS OF COUNTRY CLUB TERRACE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH DECEMBER MTX Additions Page 115 of 178 334 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3781 080.72120 14,419 INSTALL 1530 FEET 2 INCH POLY ALONG TIBBS DRIVE AND ABANDON 1563 FEET STEEL, DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VALLEY MILLS SYSTEM INTEGRITY OCTOBER 3782 080.72122 43,433 INSTALL 2694 FEET OF 2 INCH POLY AND 4379 FEET OF 4 INCH POLY ALONG STREETS OF ITALY AND ABANDON 2469 FEET OF 2 INCH STEEL, 4046 FEET OF 3 INCH STEEL, 150 FEET OF 3 INCH POLY, 585 FEET OF 4 INCH STEEL, 815 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION 03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ITALY SYSTEM INTEGRITY OCTOBER 3783 080.72123 22,553 RELOCATE FACILITIES. INSTALL 1902 FEET OF 6 INCH POLY ALONG BONNIE BRAE AND ABANDON 1007 FEET OF 3 INCH AND 497 FEET OF 4 INCH AND 533 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET WIDENING PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES DECEMBER 3784 080.72135 392,994 INSTALL 3,300 FEET OF 6 INCH POLY ALONG THE STREETS OF COUNTRY CLUB TERRACE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS DENTON GROWTH SEPTEMBER 3785 080.72140 6,056 INSTALL 665 FEET OF 2 INCH POLY AND RETIRE 602 FT OF 4 INCH STEEL IN ALLEY OF WEST LAMAR STREET IN SHERMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER 3786 080.72141 13,431 INSTALL 3600 FEET OF 4 INCH POLY ALONG BIRDS FORT TRAIL. RESIDENTIAL ARLINGTON GROWTH APRIL 3787 080.72142 (43) INSTALL 346 FEET OF 2 INCH POLY ALONG THE STREETS OF HORIZON LAKE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH MARCH 3788 080.72144 52,512 INSTALL 320 FEET OF 4 INCH POLY ALONG 4TH STREET AND ABANDON 320 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO SYSTEM INTEGRITY OCTOBER 3789 080.72145 2,622 INSTALL 430 FEET OF 2 INCH POLY AND ABANDON 1,089 FEET OF 5 INCH BARE STEEL AND 47 FEET OF 2 INCH IP POLY MAIN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER 3790 080.72155 4,514 INSTALL 470 FEET OF 2 INCH POLY AND ABANDON 470 FEET OF 2 INCH STEEL ALONG RIDGETON ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3791 080.72158 42,607 INSTALL 2410 FEET OF 4 INCH AND 1850 FEET OF 2 INCH POLY ALONG KENWOOD COURT AND ABANDON 2420 FEET OF 6 INCH, 780 FEET OF 4 INCH AND 360 FEET OF 8 INCH STEEL, 700 FEET OF 3 INCH POLY, 400 FEET OF 2 INCH POLY AND 270 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 3792 080.72162 4,537 INSTALL 550 FEET OF 4 INCH POLY ALONG WEST 24TH STREET AND ABANDON 550 FEET OF 4 INCH BARE STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 3793 080.72164 13,730 RELOCATE FACILITIES. INSTALL 470 FEET OF 6 INCH POLY ALONG CADIZ STREET AND ABANDON 400 FEET OF 6 INCH POLY MAIN TO ACCOMODATE CADIZ BRIDGE RELOCATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 3794 080.72167 250 INSTALLED TWO CASING VENTS ALONG LINE C22. ALL CUSTOMERS IRVING PIPELINE INTEGRITY JANUARY 3795 080.72168 6,074 REPLACE 720 FEET OF POLY ALONG HIGHWAY IN ACCORDANCE WITH THE TEXAS RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY OCTOBER 3796 080.72170 14,243 INSTALL 1450 FEET OF 6 INCH POLY AND 20 FEET OF 2 INCH POLY ALONG 12TH SOUTHWEST AND ABANDON 1450 FEET OF 6 INCH STEEL AND 15 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER 3797 080.72174 1,668 INSTALL 986 FEET OF 8 INCH POLY ALONG COIT ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FRISCO GROWTH JUNE 3798 080.72176 2,648 RELOCATE FACILITIES. INSTALL 368 FEET OF 2 INCH POLY ALONG EAST LIVE OAK STREET AND ABANDON 357 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURNET RELOCATION OF FACILITIES OCTOBER 3799 080.72177 7,631 RELOCATE FACILITIES. INSTALL 347 FEET OF 4 INCH POLY AND 258 FEET OF 2 INCH POLY ALONG REES STREET AND ABANDON 35 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF KERRVILLE STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES OCTOBER 3800 080.72180 15,451 RELOCATE FACILITIES. INSTALL 1120 FEET OF 2 INCH POLY ALONG JANE LANE AND ABANDON 1110 FEET OF 2 INCH, 50 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF WEST IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST RELOCATION OF FACILITIES OCTOBER 3801 080.72181 10,642 INSTALL 675 FEET OF 4 INCH AND 384 FEET OF 2 INCH POLY ALONG THE STREETS OF THE SHOPS AT HIGHLAND VILLAGE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FRISCO GROWTH SEPTEMBER 3802 080.72182 419 INSTALL 2700 FEET OF 6 INCH AND 1300 FEET OF 4 INCH POLY ALONG MILES ROAD AND STATION BOULEVARD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS SACHSE GROWTH JULY 3803 080.72187 2,008 INSTALL DISTRICT REGULATOR STATION 429 ALONG THE STREETS OF EVERMAN AND ABANDON DISTRICT REGULATOR STATION 439 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN SYSTEM INTEGRITY OCTOBER 3804 080.72191 5,726 INSTALL NEW HIGH PRESSURE GAS SERVICE LINE AND METER FOR HOLT / CAT EQUIPMENT SUPPLIER. COMMERCIAL OR INDUSTRIAL IRVING GROWTH APRIL 3805 080.72192 1,786 INSTALL 1050 FEET OF 4 INCH AND 450 FEET OF 2 INCH POLY ALONG SOUTH 20TH STREET. COMMERCIAL OR INDUSTRIAL EULESS GROWTH MARCH 3806 080.72195 (17,916) INSTALL 80 FEET OF 2 INCH POLY FOR THE DALLAS COUNTY OAK CLIFF GOVERNMENT CENTER. COMMERCIAL OR INDUSTRIAL DALLAS GROWTH MARCH 3807 080.72196 2,904 INSTALL 285 FEET OF 2 INCH POLY ALONG PHILLIPS STREET AND 2ND STREET AND ABANDON 285 FEET OF 2 INCH STEEL IN ACCORDANCE WTH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORMANGEE SYSTEM INTEGRITY OCTOBER 3808 080.72199 (134,687) INSTALL 3500 FEET OF 2 INCH POLY ALONG TATE STREET AND ABANDON 1850 FEET OF 4 INCH STEEL AND 460 FEET OF 4 INCH, 420 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY DECEMBER 3809 080.72202 3,277 INSTALL 300 FEET OF 2 INCH POLY AND ABANDON 300 FEET OF 2 INCH BARE STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY OCTOBER 3810 080.72203 29,552 RELOCATE FACILITIES. INSTALL 2119 FEET OF 6 INCH POLY, 120 FEET OF 4 INCH POLY AND 171 FEET OF 2 INCH POLY ALONG PIPELINE ROAD AND ABANDON 1760 FEET OF 6 INCH POLY, 164 FEET OF 4 INCH POLY AND 176 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF HURST STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST RELOCATION OF FACILITIES DECEMBER 3811 080.72204 4,890 RELOCATE FACILITIES. INSTALL 100 FEET OF 6 INCH POLY ALONG CHISHOLM HILLS SUBDIVISION OFF OF WOODARD AVENUE TO ACCOMMODATE ROADWAY CROSSING IN ACCORDACE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE RELOCATION OF FACILITIES OCTOBER 3812 080.72207 542 INSTALL 3,868 FEET OF 6 INCH POLY TO SERVE A NEW COMMERCIAL PROJECT CALLED ASCENDANTS. THIS PROJECT IS LOCATED IN THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH JULY 3813 080.72208 604,093 INSTALL 13,112 FEET OF 4 INCH, 4,100 FEET OF 2 INCH POLY ALONG PRAIRIE CREST LANE IN ARLINGTON. RESIDENTIAL ARLINGTON GROWTH DECEMBER 3814 080.72210 472 INSTALL 4,530 FEET OF 4 INCH AND 1,865 FEET OF 2 INCH POLY ALONG THE STREETS OF THE RESERVE PHASES 1-3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENISON GROWTH JULY 3815 080.72223 1,083,263 RELOCATE FACIILITIES. INSTALL 1,300 FEET OF 6 INCH AND 200 FEET OF 2 INCH POLY ALONG SPRING VALLEY ROAD AND LINGCO DRIVE IN RICHARDSON AND ABANDON 1,300 FEET OF 6 INCH STEEL AND 200 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY SEPTEMBER 3816 080.72229 1,579 RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH POLY ALONG STREETS OF TROPHY CLUB AND ABANDON 115 FEET OF 2 INCH POLY TO ACCOMMODATE TARRANT COUNTY DRAINAGE PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TROPHY CLUB RELOCATION OF FACILITIES OCTOBER 3817 080.72232 3,996 PURCHASE CUTTER AND 6 INCH SHORTSTOP FOR ABILENE DISTRICT. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT JUNE 3818 080.72235 (19,752) INSTALL 450 FEET OF 4 INCH POLY ALONG BELT LINE ROAD. COMMERCIAL OR INDUSTRIAL DESOTO GROWTH JUNE MTX Additions Page 116 of 178 335 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3819 080.72238 784 INSTALL 360 FEET OF 6 INCH AND 4840 FEET OF 2 INCH POLY ALONG THE STREETS IF BAR WEST RANCH DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH MARCH 3820 080.72240 91,532 RELOCATE FACILITIES. INSTALL 840 FEET OF 2 INCH, 70 FEET OF 4 INCH AND 1721 FEET OF 6 INCH POLY ALONG FM 89 AND ABANDON 2482 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE RELOCATION OF FACILITIES DECEMBER 3821 080.72241 3,524 INSTALL 705 FEET OF 2 INCH POLY ALONG THE STREETS OF 15TH STREET TOWNHOMES. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PLANO GROWTH JUNE 3822 080.72242 9,527 INSTALL 350 FEET OF 4 INCH POLY IN EASEMENT EAST OF MURPHY ROAD TO SERVE MURPHY MARKETPLACE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL MURPHY GROWTH JUNE 3823 080.72243 322 INSTALL 455 FEET OF 2 INCH POLY ALONG THE STREETS OF 1897 TOWNHOMES IN PLANO. DEVELOPER INSTALLED FACILITY. RESIDENTIAL PLANO GROWTH OCTOBER 3824 080.72247 86,905 INSTALL 600 FEET OF 4 INCH POLY ALONG E PALM VALLEY. COMMERCIAL OR INDUSTRIAL ROUND ROCK GROWTH DECEMBER 3825 080.72248 19,590 RELOCATE FACILITIES. ABANDON 250 FEET OF 3 INCH STEEL ALONG COMMONWEATH DRIVE TO ACCOMODATE DEVELOPMENT PROJECT. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES JULY 3826 080.72249 (2,545) INSTALL 30 FEET OF 4 INCH POLY ALONG FM 685. COMMERCIAL OR INDUSTRIAL PFLUGERVILLE GROWTH JUNE 3827 080.72250 (9,992) INSTALL 140 FEET OF 4 INCH POLY ALONG LOWES BOULEVARD. COMMERCIAL OR INDUSTRIAL KILLEEN GROWTH JUNE 3828 080.72251 6,954 INSTALL 75 FEET OF 2 INCH POLY ALONG ASHWOOD LANE. RESIDENTIAL FAIRVIEW GROWTH APRIL 3829 080.72255 4,074 RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY AND ABANDON 700 FEET OF 6 INCH STEEL, AND 200 FEET OF 2 INCH STEEL ALONG 8TH AVENUE AND PENNSYLVANIA AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3830 080.72259 57 INSTALL 400 FEET OF 2 INCH POLY ALONG ETHRIDGE DRIVE. RESIDENTIAL THE COLONY GROWTH MARCH 3831 080.72266 278,037 INSTALL 42,100 FEET OF 4 INCH STEEL AND ABANDON 42,070 FEET OF 6 INCH STEEL ALONG LINE O29 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SCURRY SYSTEM INTEGRITY OCTOBER 3832 080.72268 1,475 INSTALL TAP OFF OF LINE O28-2 AT LIBERTY GROVE. ALL CUSTOMERS ROWLETT SYSTEM INTEGRITY APRIL 3833 080.72270 1,053,937 INSTALL 3,100 FEET OF 2 INCH POLY ALONG SPRINGWOOD LANE AND SPRINGPARK WAY IN PLANO AND ABANDON 3,100 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY DECEMBER 3834 080.72273 8,064 RELOCATE FACILITIES. INSTALL 130 FEET OF 6 INCH POLY ALONG ARAPAHO ROAD AND ABANDON 130 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES OCTOBER 3835 080.72275 15,710 RELOCATE FACILITIES. INSTALL 860 FEET OF 4 INCH POLY, 20 FEET OF 2 INCH POLY AND ABANDON 800 FEET OF 4 INCH STEEL, 60 FEET OF 4 INCH POLY, 20 FEET OF 2 INCH POLY ALONG CULVER AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 3836 080.72277 3 INSTALL 4000 LINEAR FEET OF 4 INCH IP POLY MAIN AND 400 LINEAR FEET OF 2 INCH POLY MAIN ALONG THE STREETS OF TRADITIONS PHASE 36. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH JANUARY 3837 080.72278 126,290 INSTALL 2000 FEET OF 2 INCH AND 550 FEET OF 4 INCH POLY ALONG LINE C10-5 AND ABANDON 3 MILES OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTH RICHLAND HILLS SYSTEM INTEGRITY DECEMBER 3838 080.72280 205,607 INSTALL 4,450 FEET OF 2 INCH, 1,460 FEET OF 4 INCH POLY ALONG THE STREETS OF STONERIDGE SUBDIVISION IN MELISSA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH SEPTEMBER 3839 080.72281 578 INSTALL 1200 FEET OF 6 INCH POLY ALONG MAGER LANE. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS HUTTO GROWTH SEPTEMBER 3840 080.72285 426,195 INSTALL 3,055 FEET OF 8 INCH, 3,185 FEET OF 6 INCH, AND 25 FEET OF 4 INCH POLY ALONG MELISSA ROAD AND TELEPHONE ROAD (CR 277) IN MELISSA. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MELISSA GROWTH DECEMBER 3841 080.72289 12,983 INSTALL 660 FEET OF 6 INCH POLY AND ABANDON 660 FEET OF 6 INCH POLY ALONG WILLIAMS DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER 3842 080.72290 8,783 INSTALL 1200 FEET OF 2 INCH POLY AND ABANDON 127 FEET OF 1.25 INCH POLY, 75 FEET OF 1.25 INCH STEEL, 891 FEET OF 2 INCH POLY, 1062 FEET OF 2 INCH STEEL AND ABANDON DISTRICT REGULATOR STATION 03 ALONG NORTH KICKAPOO STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LIPAN SYSTEM INTEGRITY OCTOBER 3843 080.72292 36,231 INSTALL 3635 FEET OF 2 INCH POLY AND ABANDON 14 FEET OF 1.25 INCH POLY, 1899 FEET OF 2 INCH POLY, 13 FEET OF 1.25 INCH STEEL, 1511 FEET OF 2 INCH STEEL AND ABANDON DRS04 ALONG STREETS OF LIPAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LIPAN SYSTEM INTEGRITY OCTOBER 3844 080.72294 5,156 INSTALL 425 FEET OF 6 INCH POLY AND 465 FEET OF 2 INCH POLY AND ABANDON 425 FEET OF 6 INCH POLY AND 465 FEET OF 2 INCH POLY ALONG WILLIMAS DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER 3845 080.72299 10,566 INSTALL 2870 FEET OF 2 INCH POLY ALONG THE STREETS OF WILCO RANCH SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH SEPTEMBER 3846 080.72300 199 INSTALL 2,550 FEET OF 6 INCH POLY ALONG FM 691. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS DENISON GROWTH JULY 3847 080.72308 3,075 INSTALL 1150 FEET OF 2 INCH POLY ALONG DAWN DRIVE AND ABANDON 1150 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER 3848 080.72310 6,848 REPLACE DISTRICT REGULATOR STATION #02 IN VENUS AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VENUS SYSTEM INTEGRITY OCTOBER 3849 080.72311 26,382 INSTALL 2,065 FEET OF 2 INCH AND 1,720 FEET OF 4 INCH POLY ALONG THE STREETS OF PARKVUE SUBDIVISION. RESIDENTIAL DENTON GROWTH JULY 3850 080.72314 10,094 INSTALL 630 FEET OF 4 INCH POLY ALONG NORTH LINDALE LANE AND ABANDON 630 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY OCTOBER 3851 080.72315 144,766 INSTALL 2440 FEET OF 2 INCH POLY AND 1560 FEET OF 4 INCH POLY ALONG THE STREETS OF ARROWHEAD FARMS SUBDIVISION. RESIDENTIAL CALDWELL GROWTH JUNE 3852 080.72317 (16) INSTALL 2,835 FEET OF 2 INCH POLY ALONG THE STREETS OF PRAIRIE OAKS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL OAK POINT GROWTH MARCH 3853 080.72320 (49,019) INSTALL 7500 FEET OF 6 INCH POLY ALONG SPRING CREEK PARKWAY AND ABANDON 7500 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY OCTOBER 3854 080.72321 19,895 INSTALL 1525 FEET OF 2 INCH POLY ALONG STREETS OF RANGER AND ABANDON 173 FEET OF 1.25 INCH STEEL, 67 FEET OF 2 INCH STEEL, 14 FEET OF 3 INCH STEEL, 29 FEET OF 4 INCH STEEL, 65 FEET OF 2 INCH POLY AND 68 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER SYSTEM INTEGRITY OCTOBER 3855 080.72322 22,322 INSTALL 1650 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION AND ABANDON 1221 FEET OF 2 INCH STEEL AND 468 FEET OF 3 INCH STEEL AND DISTRICT REGULATOR STATION 11 ALONG STREETS OF RANGER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER SYSTEM INTEGRITY OCTOBER 3856 080.72324 951,657 INSTALL 1,445 FEET OF 6 INCH AND 2,132 FEET OF 8 INCH POLY ALONG THE STREETS OF JIM CHRISTAL TOAD AND N WESTERN BOULEVARD IN DENTON, DENTON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER 3857 080.72329 478,082 INSTALL 2700 FEET OF 6 INCH POLY ALONG CUSTER ROAD AND ABANDON 2700 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY OCTOBER 3858 080.72336 66,877 RELOCATE FACILITIES. INSTALL 750 OF 6 INCH POLY AND AND ABANDON 740 FEET OF 6 INCH POLY TO ACCOMMODATE SANITARY SEWER LINE. ALL CUSTOMERS HASLET RELOCATION OF FACILITIES OCTOBER 3859 080.72338 5,799 INSTALL 100 FEET OF 2 INCH POLY ALONG ARMOR DRIVE. RESIDENTIAL DALLAS GROWTH JULY MTX Additions Page 117 of 178 336 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3860 080.72347 358,740 RELOCATE FACILITIES.&NBSP; INSTALL 925 FEET OF 2 INCH AND 300 FEET OF 8 INCH POLY ALONG ECHO BLUFF AND ABANDON 925 FEET OF 2 INCH POLY AND 330 FEET OF 8 INCH STEEL TO ACCOMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 3861 080.72348 6,986 INSTALL 80 FEET OF 2 INCH POLY AND 100 FEET OF 2 INCH POLY ALONG COUNTY ROAD 825 AND ABANDON 25 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYLVESTER SYSTEM INTEGRITY OCTOBER 3862 080.72352 6,267 REPLACE REGULATOR AND RELIEF VALVE AT MAIN LINE REGULATOR 01 ON LINE B15 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AURORA SYSTEM INTEGRITY OCTOBER 3863 080.72353 8,142 INSTALL 1700 FEET OF 2 INCH POLY AND ABANDON 1700 FEET 3 INCH AND 2 INCH STEEL ALONG STREETS OF PALMER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALMER SYSTEM INTEGRITY OCTOBER 3864 080.72354 13,128 INSTALL 1300 FEET OF 2 INCH POLY AND ABANDON 22 FEET OF 1.25 INCH POLY, 1280 FEET OF 4 INCH STEEL, 325 FEET OF 2 INCH POLY, 185 FEET OF 4 INCH POLY, 37 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ITALY SYSTEM INTEGRITY OCTOBER 3865 080.72364 217 INSTALL 1200 FEET OF 6 INCH POLY ALONG GIFFORD STREET. ALL CUSTOMERS GRAND PRAIRIE GROWTH MARCH 3866 080.72367 10,975 RELOCATE FACILITIES. INSTALL 1948 FEET OF 6 INCH POLY, 75 FEET OF 4 INCH POLY AND 344 FEET OF 2 INCH POLY AND ABANDON 1527 FEET OF 6 INCH POLY AND 387 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF COLLEYVILLE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE RELOCATION OF FACILITIES DECEMBER 3867 080.72368 20,318 REPLACE 222 STEEL SERVICES WITH POLY SERVICES ON MAPSHEET #021 IN HILLSBORO IN ACCORDANCE WITH RAILROAD COMMISION RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 3868 080.72369 3,821 RELOCATE FACILITIES. INSTALL 950 FEET OF 4 INCH AND 330 FEET OF 2 INCH POLY ALONG N COLLEGE STREET AND ABANDON 300 FEET OF 4 INCH, 773 FEET OF 2 INCH STEEL, 87 FEET OF 4 INCH, 107 FEET OF 2 INCH, AND 445 FEET OF 1.25 INCH POLY TO ACCOMMODATE THE CITY OF WAXAHACHIE DRAINAGE PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE RELOCATION OF FACILITIES OCTOBER 3869 080.72371 74,917 INSTALL 6788 FEET OF 2 INCH AND 3798 FEET OF 4 INCH POLY ALONG THE STREETS IF CAMBRIDGE PARK SUBDIVISION. RESIDENTIAL PROSPER GROWTH JULY 3870 080.72372 578,756 INSTALL 3,370 FEET OF 2 INCH POLY ALONG MONTICELLO ROAD IN WAXAHACHIE AND ABANDON 2,301 FEET OF 2 INCHSTEEL AND 159 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY DECEMBER 3871 080.72373 117,916 REPLACE 6000 FEET OF 2 INCH STEEL WITH 4 INCH STEEL ALONG LINE M5 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MAYPEARL SYSTEM INTEGRITY DECEMBER 3872 080.72377 4,194 RELOCATE FACILITIES. INSTALL 125 FEET OF 6 INCH POLY AND 210 FEET OF 1.25 INCH POLY AND ABANDON 125 FEET OF 6 INCH POLY AND 210 FEET OF 2 INCH POLY ALONG MCNIEL AND MAPLEWOOD TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES OCTOBER 3873 080.72379 3 INSTALL 240 FEET OF 6 INCH POLY ALONG FM 691. COMMERCIAL OR INDUSTRIAL SHERMAN GROWTH JANUARY 3874 080.72380 8,533 INSTALL 820 FEET OF 8 INCH POLY ALONG NORTH MESQUITE CREEK AND ABANDON 800 FEET OF 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY OCTOBER 3875 080.72385 9,906 INSTALL 1,365 FEET OF 2 INCH POLY AND ABANDON 99 FEET OF 3 INCH POLY, 648 FEET OF 3 INCH STEEL, AND 118 FEET OF 2 INCH STEEL ALONG WENONAH AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3876 080.72386 6,327 INSTALL 1,430 FEET OF 2 INCH POLY AND ABANDON 602 FEET OF 4 INCH POLY, 504 FEET OF 2 INCH STEEL, AND 13 FEET OF 4 INCH STEEL ALONG INDIAN HEIGHTS BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3877 080.72387 8,833 INSTALL 1,650 FEET OF 2 INCH POLY AND ABANDON 854 FEET OF 2, 3, AND 4 INCH POLY, 1204 FEET OF 2 AND 4 INCH STEEL, AND 15 FEET OF 6 INCH STEEL MAIN ALONG WENONAH IN WICHITA FALLS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3878 080.72388 3,747 INSTALL 950 FEET OF 2 INCH POLY AND ABANDON 351 FEET OF 4 INCH STEEL, 233 FEET OF 4 INCH POLY, AND 239 FEET OF 2 INCH POLY ALONG CAROL ANN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3879 080.72389 3,834 INSTALL 1100 FEET OF 2 INCH POLY AND ABANDON 816 FEET OF 4 INCH POLY, 306 FEET OF 4 INCH, AND 378 FEET OF 4 INCH STEEL ALONG BIRCH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3880 080.72390 128,368 INSTALL 1,000 OF 2 INCH POLY ALONG BEECH STREET AND ABANDON 606 FEET OF 2 INCH AND 879 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 3881 080.72391 258,226 INSTALL 2,300 FEET OF 2 INCH POLY ALONG SEYMOUR AND CHERRY IN WICHITA FALLS AND ABANDON 663 FEET OF 2 INCH, 341 FEET OF 4 INCH, 463 FEET OF 1.25 INCH STEEL AND 344 FEET OF 4 INCH, 506 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3882 080.72392 133,648 INSTALL 1,375 FEET OF 2 INCH POLY AND ABANDON 572 FEET OF 2 INCH, 805 FEET OF 4 INCH STEEL AND 26 FEET OF 4 INCH POLY ALONG AVE J AND ARTHUR IN WICHITA FALLS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3883 080.72401 36,503 LINE D9 TO D1 2019 ILI DIGS TO PERFORM CAPITAL REPAIRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 3884 080.72403 (90,073) RELOCATE FACILITIES. INSTALL 320 FEET OF 6 INCH POLY AND ABANDON 320 FEET OF 6 INCH STEEL TO ACCOMMODATE NEW CEFCO. ALL CUSTOMERS PALESTINE RELOCATION OF FACILITIES JUNE 3885 080.72408 20,731 INSTALL 312 FEET OF 6 INCH AND 4220 FEET OF 2 INCH POLY ALONG THE STREETS OF THE RETREAT SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH APRIL 3886 080.72409 445 INSTALL 1,622 FEET OF 2 INCH POLY ALONG THE STREETS OF PARKHAVEN PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SHERMAN GROWTH JUNE 3887 080.72412 714 INSTALL 2620 FEET OF 4 INCH POLY ALONG THE STREETS OF WATERS EDGE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROBINSON GROWTH JULY 3888 080.72413 1,252,251 INSTALL 5,750 FEET OF 4 INCH STEEL, MAIN LINE REGULATOR STATION AND ABANDON 5,750 FEET OF 2 INCH STEEL, MAIN LINE REGULATOR STATION ALONG US HWY 77 IN ELLIS COUNTY. IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORRESTON SYSTEM INTEGRITY DECEMBER 3889 080.72415 3,370 RELOCATE FACILITIES. INSTALL 10 SERVICE LINES ALONG GRIGGS STREET AND ABANDON 10 POLY SERVICES TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL RELOCATION OF FACILITIES OCTOBER 3890 080.72418 4,133 INSTALL 415 FEET 2 INCH ALONG HALEY AVE AND ABANDON 405 FEET 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKDALE SYSTEM INTEGRITY OCTOBER 3891 080.72420 40,380 INSTALL 2257 FEET OF 2 INCH POLY, 840 FEET OF 4 INCH POLY AND ABANDON 3171 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 3892 080.72421 145,945 INSTALL 2717 FEET OF 4 INCH AND 680 FEET OF 2 INCH POLY ALONG STREETS OF WACO AND ABANDON 2851 FEET OF 4 INCH STEEL AND 425 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 3893 080.72426 13,883 INSTALL 1260 FEET OF 2 INCH POLY AND RETIRE 1260 FEET OF 2 INCH LP STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER MTX Additions Page 118 of 178 337 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3894 080.72431 3,345 RELOCATE FACILTIES. INSTALL 280 FEET OF 6 INCH POLY AND ABANDON 250 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF FRISCO STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO RELOCATION OF FACILITIES OCTOBER 3895 080.72437 9,992 INSTALL 2065 FEET OF 2 INCH POLY ALONG COUNTY ROAD 816 AND ABANDON 2410 FEET 2 INCH STEEL AND DISTRICT REGLUATOR STATION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYLVESTER SYSTEM INTEGRITY OCTOBER 3896 080.72438 367,081 INSTALL 1225 FEET OF 2 INCH AND 1500 FEET OF 4 INCH POLY ALONG THE STREETS OF WACO AND ABANDON 1225 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 3897 080.72439 1,021,021 INSTALL 1,135 FEET OF 2 INCH AND 1,430 FEET OF 4 INCH POLY ALONG GORMAN AND MORROW STREETS AND ABANDON 2,401 FEET OF 4 INCH STEEL, 336 FEET OF 4 INCH AND 716 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE OF 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 3898 080.72443 18,676 INSTALL 1300 FEET OF 2 INCH POLY ALONG MARYLAND STREET AND ABANDON DISTRICT REGLUATOR STATION, 1670 FEET 2 INCH STEEL AND 830 FEET 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MALAKOFF SYSTEM INTEGRITY OCTOBER 3899 080.72448 27,579 INSTALL 2155 FEET OF 4 INCH POLY AND 645 FEET OF 2 INCH POLY AND ABANDON 2155 FEET OF 4 INCH STEEL AND 645 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 3900 080.72449 30,302 INSTALL 2150 FEET OF 4 INCH POLY AND 360 FEET OF 2 INCH POLY AND ABANDON 2050 FEET OF 4 INCH STEEL AND 330 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 3901 080.72450 33,617 INSTALL 2600 FEET OF 4 INCH POLY AND ABANDON 2402 OF 3 INCH STEEL ALONG GUTHRIE DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 3902 080.72451 15,831 INSTALL 970 FEET OF 2 INCH POLY ALONG CUBA COURT AND ABANDON 956 FEET OF 2 INCH STEEL AND 20 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3903 080.72452 131,673 RELOCATE FACILITIES. INSTALL 700 FEET OF 2INCH POLY AND ABANDON 950 FEET OF STEEL ALONG CHERYL ST IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 3904 080.72461 12,554 RELOCATE FACILITIES. INSTALL 900 FEET OF 4 INCH POLY AND ABANDON 900 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 3905 080.72463 5,014 INSTALL 125 FEET OF 8 INCH POLY AND ABANDON 115 FEET OF 8 INCH STEEL ALONG TILDEN STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3906 080.72467 8,464 INSTALL 60 FEET OF 12 POLY AND 230 FEET OF 4 INCH POLY AND ABANDON 12 INCH AND 4 INCH STEEL ALONG SHEPPARD ACCESS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 3907 080.72470 16,131 RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH POLY AND ABANDON 300 FEET OF 1.25 INCH POLY TO ACCOMMODATE CITY OF COLONY STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THE COLONY RELOCATION OF FACILITIES OCTOBER 3908 080.72473 795,211 INSTALL DISTRICT REGULATOR STATION ALONG HALL JOHNSON ROAD AND ABANDON DISTRICT REGULATOR STATION #05 AND #08. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER 3909 080.72480 (293,122) RELOCATE FACILITIES. INSTALL 292 FEET OF 4 INCH STEEL AND ABANDON 284 FEET OF 4 INCH STEEL ALONG LINE O29 TO ACCOMMODATE TXDOT PROJECT. ALL CUSTOMERS CRANDALL RELOCATION OF FACILITIES AUGUST 3910 080.72490 6,975 INSTALL 950 FEET OF 2 INCH POLY ALONG SOUTH MAIN STREET AND ABANDON 678 FEET OF 2 INCH STEEL AND 482 FEET OF 2 INCH POLY AND DISTRICT REGLUATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENT SYSTEM INTEGRITY OCTOBER 3911 080.72491 80 INSTALL 450 FEET OF 2 INCH POLY ALONG RECOGNITION POINT DRIVE. ALL CUSTOMERS IRVING GROWTH APRIL 3912 080.72495 9,622 INSTALL 600 FEET OF 2 INCH POLY AND 200 FEET OF 4 INCH POLY ALONG 3RD STREET AND ABANDON 700 FEET OF 4 INCH AND 100 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM SYSTEM INTEGRITY OCTOBER 3913 080.72497 9,269 INSTALL 642 FEET OF 4 INCH POLY ALONG CLARK STREET AND ABANDON 988 FEET OF 4 INCH STEEL, AND 10 FEET OF 2 INCH STEEL ALONG CLARK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BARTLETT SYSTEM INTEGRITY OCTOBER 3914 080.72498 12,245 RELOCATE FACILITIES. INSTALL 950 FEET OF 2 INCH POLY ALONG BRADFORD STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES OCTOBER 3915 080.72499 30,096 INSTALL 975 FEET OF 4 INCH POLY, 1750 FEET OF 2 INCH POLY AND ABANDON 1,525 FEET OF 4 INCH AND 515 FEET OF 2 INCH STEEL ALONG STREETS OF GRAND PRAIRIE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 3916 080.72500 (153,984) INSTALL 3.200 FEET OF 12 INCH POLY AND ABANDON 3.200 FEET OF 6 INCH POLY ALONG W. EVERMAN PKWY. ALL CUSTOMERS FORT WORTH SYSTEM IMPROVEMENT DECEMBER 3917 080.72504 11,944 INSTALL 8 INCH STEEL MAIN VALVE AND 4 INCH STEEL STRADDLE VALVE AND ABANDON 8 INCH MAIN VALVE AND 4 INCH STRADDLE VALVE ALONG AVENUE L IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 3918 080.72505 15,654 RELOCATE FACILITIES. INSTALL 980 FEET OF 4 INCH POLY AND ABANDON 980 FEET OF 3 INCH STEELTO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 3919 080.72508 77 ABANDON 6630 FEET OF 4 INCH STEEL ALONG HUTTO ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER 3920 080.72512 23,320 INSTALL 300 FEET OF 4 INCH, 2300 FEET OF 2 INCH POLY ALONG WICKER AVE ALLEYWAY AND ABANDON 300 FEET OF 3 INCH STEEL, 2300 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY OCTOBER 3921 080.72516 370 INSTALL 1360 FEET OF 4 INCH POLY ALONG THE STREETS OF WATERS EDGE SUBDIVISION. ALL CUSTOMERS ROBINSON GROWTH JULY 3922 080.72517 1,937,434 INSTALL 18,900 FEET OF 8 INCH, 160 FEET OF 6 INCH AND 350 FEET OF 2 INCH POLY ALONG MONTE CARLO BOULEVARD AND LONGNECK ROAD IN PRINCETON. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PRINCETON GROWTH DECEMBER 3923 080.72518 530,025 INSTALL 13,430 FEET OF 2 INCH, 75 FEET OF 4 INCH, 3,425 FEET OF 6 INCH POLY ALONG THE STREETS OF EASTRIDGE SUBDIVISION IN PRINCETON. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PRINCETON GROWTH DECEMBER 3924 080.72524 289,802 INSTALL 2600 FEET OF 2 INCH POLY ALONG SOUDER DRIVE AND ABANDON 1377 FEET OF 2 INCH STEEL, 469 FEET OF 4 INCH STEEL AND 706 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.029. ALL CUSTOMERS HURST SYSTEM INTEGRITY OCTOBER 3925 080.72525 359,052 RELOCATE FACILITIES.&NBSP;&NBSP; ISNTALL 2,600 FEET ON 2INCH POLY AND ABANDON 1,519 FEET OF 2INCH STEEL ALONG HURSTVIEW DRIVE AND 1.058 FEET OF 2 INCH POLY; IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 3926 080.72526 465,705 RELOCATE FACILITIES.; INSTALL 1,200 FEET OF 2 INCH AND 1,500 FEET OF 6 INCH POLY ALONG NORTH ARTHUR DRIVE AND ABANDON 1,183 FEET OF 1.25 INCH AND 1,127 FEET OF 2 INCH POLY; 7 FEET OF 1.25 INCH; AND 1,732 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY SEPTEMBER 3927 080.72527 311,782 INSTALL 2,550 FEET OF 2 INCH POLY AND ABANDON 2,215 FEET OF 3 INCH STEEL AND 955 FEET OF 4 INCH STEEL ALONG MYRTLE DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 3928 080.72528 322,367 INSTALL 2,570 FEET OF 4 INCH POLY ALONG CULLUM AVENUE AND ABANDON 93 FEET OF 4 INCH POLY, 2,666 FEET OF 4 INCH STEEL, AND 148 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY OCTOBER MTX Additions Page 119 of 178 338 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3929 080.72529 572,863 INSTALL 2,935 FEET OF 4 INCH POLY ALONG HENSON DRIVE AND THOMAS AVENUE AND ABANDON 45 FEET OF 4 INCH POLY AND 2,848 FEET OF 4 INCH STEEL IN ACCORDANE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 3930 080.72530 698 INSTALL 2600 FEET OF 2 INCH AND 1800 FEET OF 4 INCH POLY ALONG THE STREETS OF RIDGE RANCH PH 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MESQUITE GROWTH MARCH 3931 080.72533 99,046 RELOCATE FACILITIES.&NBSP; INSTALL 350 FEET OF 2 INCH POLY ALONG 10TH STREET AND ABANDON 400 FEET OF 2 INCH STEEL AND 350 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 3932 080.72534 17,491 INSTALL 388 FEET OF 6 INCH AND 3,082 FEET OF 2 INCH POLY ALONG THE STREETS OF PARKSIDE ON THE RIVER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER 3933 080.72535 254,249 INSTALL 1,500 FEET OF 2 INCH POLY AND ABANDON 991 FEET OF 2 INCH STEEL AND 430 FEET OF 3 INCH STEEL ALONG EAST WENONAH BOULEVARD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 3934 080.72536 264,246 RELOCATE FACILITIES. INSTALL 2,000 FEET OF 2 INCH POLY ALONG WEST WENONAH BOULEVARD AND ABANDON 1,522 FEET OF 2 INCH STEEL AND 433 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY JULY 3935 080.72539 76,702 INSTALL 1825 FEET ON 8 INCH POLY ALONG THE STREETS OF PARKSIDE ON THE RIVER SUBDISVISION. ALL CUSTOMERS GEORGETOWN GROWTH SEPTEMBER 3936 080.72542 10,188 RELOCATE FACILITIES. INSTALL 945 FEET OF 4 INCH AND 120 FEET 2 INCH POLY AND ABANDON 375 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF GRAND PRAIRIE STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES OCTOBER 3937 080.72544 22,126 INSTALL 2750 FEET OF 2 INCH POLY ALONG THE STREETS IF BRENTWOOD SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SAN ANGELO GROWTH SEPTEMBER 3938 080.72545 17,670 RELOCATE FACILITIES. INSTALL 804 FEET OF 4 INCH POLY ALONG FM 2181 AND ABANDON 285 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES OCTOBER 3939 080.72550 (4,906) RELOCATE FACILITIES. INSTALL 172 FEET OF 4 INCH POLY AND ABANDON 172 FEET OF 4 INCH POLY ALONG FORD LANE TO ACCOMMODATE AAON. ALL CUSTOMERS LONGVIEW RELOCATION OF FACILITIES FEBRUARY 3940 080.72559 411,845 INSTALL 20 FEET OF 6 INCH, 493 FEET OF 4 INCH AND 339 FEET OF 2 INCH POLY ALONG LEGACY DRIVE SOUTH AND ABANDON 20 FEET OF 6 INCH, 200 FEET OF 4 INCH, 163 FEET OF 3 INCH AND 217 OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO SYSTEM INTEGRITY JUNE 3941 080.72563 (92) INSTALL 5200 FEET OF 2 INCH POLY ALONG THE STREETS OF RIDGE RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MESQUITE GROWTH JANUARY 3942 080.72564 5,277 INSTALL 300 FEET OF 2 INCH POLY ALONG RUMFIELD ROAD. RESIDENTIAL NORTH RICHLAND HILLS GROWTH OCTOBER 3943 080.72569 1,247 INSTALL 1423 FEET OF 4 INCH AND 610 FEET OF 2 INCH POLY ALONG THE STREETS OF ORCHARD RIDGE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH MARCH 3944 080.72572 13,888 INSTALL 1,700 FEET OF 2 INCH POLY, 570 FEET OF 4 INCH POLY AND ABANDON 2,325 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER 3945 080.72576 43 INSTALL 20,500 WMR END POINTS TO COMMERCIAL METERS IN THE DALLAS METRO. ALL CUSTOMERS DALLAS SYSTEM IMPROVEMENT JUNE 3946 080.72577 (47) INSTALL 1058 FEET OF 4 INCH AND 2196 FEET OF 2 INCH POLY ALONG THE STREETS OF HORIZON LAKE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH MARCH 3947 080.72580 6,813 INSTALL 2,169 WMR ENDPOINTS ON COMMERCIAL METERS IN THE ROUND ROCK AREA. ALL CUSTOMERS ROUND ROCK SYSTEM IMPROVEMENT JUNE 3948 080.72582 17,447 REPLACE 40 STEEL SERVICES WITH POLY SERVICES ALONG STREETS OF NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER 3949 080.72600 3,313 INSTALL 350 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY ALONG NORTH SWENSON STREET AND ABANDON 350 FEET OF 4 INCH AND 10 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY OCTOBER 3950 080.72603 7,186 RELOCATE FACILITIES. INSTALL 345 FEET OF 4 INCH POLY ALONG WEST 3RD STREET AND ABANDON 345 FEET OF 4 INCH AND 66 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF HEARNE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE RELOCATION OF FACILITIES OCTOBER 3951 080.72604 4,288 RELOCATE FACILITIES. INSTALL 30 FEET OF 2 INCH POLY AND ABANDON 20 FEET OF 2 INCH POLY ALONG GEYSER AVE TO ACCOMMODATE CITY OF PFLUGERVILLE CITY PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PFLUGERVILLE RELOCATION OF FACILITIES OCTOBER 3952 080.72607 15,569 INSTALL 745 FEET OF 6 INCH AND 10 FEET OF 2 INCH POLY ALONG HAILEY STREET AND ABANDON 745 FEET OF 6 INCH AND 10 FEET OF 2 INCH BARE STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER 3953 080.72609 151,247 INSTALL 6109 FEET OF 2 INCH, 85 FEET OF 4 INCH AND 904 FEET OF 6 INCH POLY ALONG THE STREETS OF THE LEXINGTON PARKS SUBDIVISION. RESIDENTIAL FRISCO GROWTH JUNE 3954 080.72610 554 INSTALL 9075 FEET OF 2 INCH POLY ALONG THE STREETS OF VERANDAH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH DECEMBER 3955 080.72612 614 INSTALL 3435 FEET OF 2 INCH POLY ALONG THE STREETS OF THE GABLES OF TIOGA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL TIOGA GROWTH MARCH 3956 080.72616 3,317 REPLACE DISTRICT REGULATOR STATION 25 IN CLEBURNE AND INSTALL 80 FEET OF 4 INCH STEEL AND ABANDON 80 FEET OF 2 INCH STEEL ALONG GRAND AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER 3957 080.72617 539,310 INSTALL 2,400 FEET OF 2 INCH, 670 FEET OF 6 INCH POLY ALONG THE STREETS OF ABILENE AND ABANDON 660 FEET OF 3 INCH STEEL AND 331 FEET OF 2 INCH POLY AND 1,765 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 3958 080.72618 3,380 REPLACE DRS05 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GROESBECK SYSTEM INTEGRITY OCTOBER 3959 080.72621 457,861 INSTALL 8,950 FEET OF 6 INCH POLY ALONG UNIVERSITY DRIVE. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FORNEY GROWTH DECEMBER 3960 080.72623 16,259 INSTALL 1354 FEET OF 4 INCH, 744 FEET OF 2 INCH POLY AND ABANDON 961 FEET OF 1.25 INCH STEEL, 177 FEET OF 2 INCH STEEL, 34 FEET OF 2 INCH POLY AND 569 FEET OF 3 INCH POLY MAINS ALONG 845 TIVY STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER 3961 080.72626 100,509 INSTALL PIG TRAP ON PLANO DT-1 IN COLLIN COUNY. ALL CUSTOMERS MCKINNEY PIPELINE INTEGRITY JULY 3962 080.72636 (180,843) INSTALL 300 FEET OF 4 INCH POLY ALONG THE STREETS OF WOODSPRING SUITES DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL ROUND ROCK GROWTH JULY 3963 080.72649 513,216 INSTALL 200 FEET OF 2 INCH, 1,470 FEET OF 4 INCH, 1,000 FEET OF 6 INCH POLY AND ABANDON 216 FEET OF 2 INCH, 1,642 FEET OF 3 INCH, 229 FEET OF 4 INCH STEEL AND 26 FEET OF 2 INCH, 263 FEET OF 3 INCH AND 334 FEET OF 4 INCH POLY ALONG THE STREETS OF ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 3964 080.72651 580,526 INSTALL 1,320 FEET OF 4 INCH, 1,450 FEET OF 6 INCH POLY AND ABANDON 632 FEET OF 2 INCH, 1,590 FEET OF 3 INCH STEEL AND 412 FEET OF 3 INCH POLY ALONG THE STREETS OF ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 3965 080.72653 13,559 INSTALL 83 FEET OF 6 INCH AND 396 FEET OF 4 INCH POLY AND ABANDON 45 FEET OF 3 INCH STEEL AND 434 FEET INCH OF 2 INCH POLY ALONG MCCLENDON ROAD. ALL CUSTOMERS HEATH SYSTEM IMPROVEMENT DECEMBER 3966 080.72654 135,594 INSTALL ACCESS CONTROL, CAMERAS, SIGNAGE, AND CABLING IT FOR FORT WORTH SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER 3967 080.72655 24,980 INSTALL ACCESS CONTROL, CAMERAS, SIGNAGE, AND CABLING IT FOR HASLET SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER 3968 080.72656 651,750 INSTALL 2,650 FEET OF 8 INCH POLY ALONG BOIS D ARC AND ABANDON 2,650 FEET OF 3 INCH STEEL. ALL CUSTOMERS HEATH SYSTEM IMPROVEMENT SEPTEMBER MTX Additions Page 120 of 178 339 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 3969 080.72658 408,212 INSTALL 258 FEET OF 6 INCH POLY ALONG FM2181 NEAR WILDWOOD LANE AND MIRANDA PLACE IN DENTON AND ABANDON 240 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER 3970 080.72659 72 INSTALL 175 FEET OF 2 INCH POLY AONG OAK STREET. RESIDENTIAL FRISCO GROWTH APRIL 3971 080.72663 2,413 INSTALL 2300 FEET OF 4 INCH POLY ALONG SMIRL DRIVE. ALL CUSTOMERS ROCKWALL SYSTEM IMPROVEMENT SEPTEMBER 3972 080.72664 260,319 INSTALL 1200 FEET OF 4 INCH POLY ALONG WEST RALPH HALL PARKWAY. ALL CUSTOMERS ROCKWALL SYSTEM IMPROVEMENT SEPTEMBER 3973 080.72665 4,621 INSTALL 3400 FEET OF 6 INCH POLY ALONG HORIZON ROAD. ALL CUSTOMERS ROCKWALL SYSTEM IMPROVEMENT OCTOBER 3974 080.72675 1,106 INSTALL 1030 FEET OF 4 INCH POLY ALONG BASSWOOD BOULEVARD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER 3975 080.72678 2,407 RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH POLY ALONG PARKPLACE AND ABANDON 350 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES OCTOBER 3976 080.72683 1,469 INSTALL 2452 FEET OF 4 INCH AND 6886 FEET OF 2 INCH POLY ALONG THE STREETS OF WOLF RANCH WEST SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER 3977 080.72687 32,220 INSTALL 50 FEET OF 24 INCH STEEL AND ABANDON 50 FEET OF 24 INCH STEEL ALONG THE STREETS OF ARLINGTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER 3978 080.72691 17,087 INSTALL 4018 FEET OF 2 INCH POLY ALONG THE STREETS OF STAR TRAIL SUBDIVISION. RESIDENTIAL PROSPER GROWTH JUNE 3979 080.72692 320 INSTALL 950 FEET OF 4 INCH POLY ALONG FORUM DRIVE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL ARLINGTON GROWTH APRIL 3980 080.72695 480,121 INSTALL 3660 FEET OF 2 INCH AND 3196 FEET OF 4 INCH POLY ALONG THE STREETS OF THE TENISON VILLAGE SUBDIVISION. RESIDENTIAL DALLAS GROWTH JUNE 3981 080.72696 2,428,932 INSTALL 4,250 FEET OF 8 INCH, 3,480 FEET OF 4 INCH AND 2,985 FEET OF 2 INCH POLY ALONG NORTH PEARSON AND ABANDON 4,300 FEET OF 2 INCH, 3,400 FEET OF 3 INCH AND 1,640 FEET OF 4 INCH STEEL AND 1,075 FEET OF 2 INCH, 1,940 FEET OF 4 INCH AND 260 FEET OF 8 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GODLEY SYSTEM INTEGRITY DECEMBER 3982 080.72698 (1,561) INSTALL 10 FEET OF 4 INCH POLY ALONG OHIO DRIVE IN COLLIN COUNTY. COMMERCIAL OR INDUSTRIAL PLANO GROWTH JUNE 3983 080.72700 1,216,213 RELOCATE FACILITIES.&NBSP; INSTALL REGULATOR STATION AND RETIRE OLD REGULATOR STATION ALONG FINLEY ROAD DUE TO OBSOLETE COMPONENTS AND MULTIPLE LEAKS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER 3984 080.72704 15,949 INSTALL 700 FEET OF 4 INCH POLY ALONG PRECINT LINE ROAD. COMMERCIAL OR INDUSTRIAL HURST GROWTH DECEMBER 3985 080.72707 37,446 INSTALL 3,715 FEET OF 6 INCH STEEL IN LAWN TEXAS AND ABANDON 3,715 FEET OF 6 INCH STEEL ALONG LINE RFB IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAWN SYSTEM INTEGRITY OCTOBER 3986 080.72709 23,815 INSTALL 2070 FEET OF 4 INCH POLY ALONG WALNUT STREET AND ABANDON 1860 FEET OF 4 INCH STEEL AND 210 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 3987 080.72723 807 INSTALL 1500 FEET OF 6 INCH POLY ALONG HIGHWAY 360. ALL CUSTOMERS ARLINGTON SYSTEM IMPROVEMENT MARCH 3988 080.72724 10,356 INSTALL 844 FEET OF 6 INCH AND 8364 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH JULY 3989 080.72726 911,269 RELOCATE FACILITIES. INSTALL 2,340 FEET OF 4 INCH POLY ALONG SOUTH CAMP WISDOM AND ABANDON 34 FEET OF 4 INCH STEEL, 445 FEET OF 2INCH AND 1,900 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS DALLAS SYSTEM INTEGRITY NOVEMBER 3990 080.72730 408 INSTALL 907 FEET OF 8 INCH AND 2288 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILLS GROWTH APRIL 3991 080.72737 (23,774) INSTALL 408 FEET OF 2 INCH POLY ALONG AUSTIN LANE IN PROSPER. RESIDENTIAL PROSPER GROWTH MARCH 3992 080.72738 2,281 INSTALL 475 FEET OF 2 INCH POLY AND ABANDON 325 FEET OF 1 INCH, 40 FEET OF 2 INCH STEEL ALONG FLORENCE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNICORPORATED COUNTY AREA, (GOODLET) SYSTEM INTEGRITY OCTOBER 3993 080.72741 10,185 INSTALL 1100 FEET OF 4 INCH POLY ALONG WEST LOOP 306 TO SERVE A NEW COMMERCIAL DEVELOPMENT ON W LOOP 306. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL SAN ANGELO GROWTH JUNE 3994 080.72742 263,037 INSTALL 666 FEET OF 4 INCH POLY ALONG EAST AUSTIN AVENUE AND NORTH LAMPASAS STREET AND ABANDON 355 FEET OF 2 INCH POLY AND 298 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY DECEMBER 3995 080.72743 16,890 INSTALL 465 FEET OF 2 INCH AND 1377 FEET OF 4 INCH POLY AND ABANDON 455 FEET OF 4 INCH STEEL, 60 FEET OF 4 INCH POLY, 1127 FEET OF 3INCH STEEL AND 200 FEET OF 2 INCH STEEL ALONG EAST WALNUT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 3996 080.72744 (2,814) INSTALL 4,072 FEET OF 6 INCH AND 1,052 FEET OF 2 INCH POLY ALONG THE STREETS OF UNIVERSITY HEIGHTS. DEVELOPER NSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER 3997 080.72746 13,289 INSTALL 3800 FEET OF 4 INCH POLY ALONG SEETON ROAD NORTH. ALL CUSTOMERS GRAND PRAIRIE SYSTEM IMPROVEMENT DECEMBER 3998 080.72747 386,169 INSTALL 3,200 FEET OF 6 INCH, 1900 FEET OF 4 INCH POLY ALONG FM 1777 IN JOSEPHINE. ALL CUSTOMERS JOSEPHINE GROWTH DECEMBER 3999 080.72751 4,556,970 INSTALL 36,960 FEET OF 4 INCH STEEL ALONG FM 897 IN BOSQUE COUNTY AND ABANDON 26,960 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE OF 8.209. ALL CUSTOMERS HICO SYSTEM INTEGRITY DECEMBER 4000 080.72752 7,802 RELOCATE FACILITIES. INSTALL 550 FEET OF 2 INCH POLY AND ABANDON 550 FEET OF 2 INCH POLY ALONG 600 BLOCK OF US 75 FRONTAGE ROAD TO ACCOMMODATE TXDOT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES OCTOBER 4001 080.72756 17,746 INSTALL 500 FEET OF 3 INCH STEEL ALONG LINE KPD1E AND ABANDON APPROX 500 FEET OF 3 INCH STEEL ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DE LEON SYSTEM INTEGRITY OCTOBER 4002 080.72757 5,252 INSTALL 1200 FEET OF 2 INCH POLY AND ABANDON 1437 FEET OF 2 INCH STEEL, 552 FEET OF 1.25 INCH STEEL, AND 121 FEET OF 2 INCH POLY ALONG NEWCOMB AND GILES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY OCTOBER 4003 080.72758 12,207 INSTALL 1,580 FEET OF 8 INCH, 46 FEET OF 4 INCH AND 7.108 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH EAST SUBDIVISION. DEVELOP INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH SEPTEMBER 4004 080.72759 411,821 REPLACE 5.25 MILES OF 10 INCH STEEL ALONG LINE KC (WEST) WITH 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLYDE SYSTEM INTEGRITY DECEMBER 4005 080.72760 641,115 INSTALL 2,320 FEET OF 4 INCH AND 465 FEET OF 2 INCH POLY ALONG COLLEGE STREET AND ABANDON 287 FEET OF 3 INCH, 817 FEET OF 4 INCH POLY AND 1,236 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER 4006 080.72762 51,386 INSTALL 2760 FEET OF 2 INCH POLY ALONG DREXEL DRIVE AND ABANDON 134 FEET OF 3 INCH POLY, 31 FEET OF 4 INCH POLY, 664 FEET OF 3 INCH STEEL, 1,483 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION 07 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER 4007 080.72763 1,113,304 INSTALL 2,610 FEET OF 4 INCH AND 525 FEET OF 2 INCH POLY ALONG BALL STREET AND ABANDON 1,941 FEET OF 4 INCH POLY AND 964 FEET OF 2, 4, AND 6 INCH STEEL AND GRAPEVINE DISTRICT REGULATOR STATION #7 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER MTX Additions Page 121 of 178 340 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4008 080.72764 4,019,069 RELOCATE FACILITIES. INSTALL 2,000 FEET OF 12 INCH. 2,500 FEET OF 10 INCH, 1,500 FEET OF 4 INCH STEEL AND 1,000 FEET OF 6 INCH POLY AND NEW HIP TO DISTRICT REGULATOR STATION ALONG HIGHWAY 6 TO WACO DRIVE AND ABANDON 1,300 FEET OF 12 INCH, 200 FEET OF 10 INCH, 2,200 FEET OF 8 INCH, 1,200 FEET OF 4 INCH, 100 FEET OF 2 INCH STEEL TO ACCOMODATE TXDOT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 4009 080.72765 16,889 INSTALL 1165 FEET OF 4 INCH POLY ALONG EAST JORDAN ROAD AND ABANDON DRS01, 427 FEET OF 2 INCH STEEL, 986 FEET OF 3 INCH STEEL, 10 FEET OF 2 INCH POLY AND 16 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JOSEPHINE SYSTEM INTEGRITY OCTOBER 4010 080.72767 552 INSTALL 1230 FEET OF 4 INCH POLY ALONG CADDO STREET AND ABANDON DRS 02 AND 1172 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JOSEPHINE SYSTEM INTEGRITY OCTOBER 4011 080.72773 12,032 INSTALL 1649 FEET OF 2 INCH POLY AND ABANDON 2083 FEET OF 2 INCH STEEL ALONG STREETS OF LITTLE RIVER ACADEMY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LITTLE RIVER ACADEMY SYSTEM INTEGRITY OCTOBER 4012 080.72775 1,896 INSTALL 404 FEET OF 2 INCH POLY AND ABANDON 398 FEET OF 2 INCH STEEL ALONG HOUSTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NEWCASTLE SYSTEM INTEGRITY OCTOBER 4013 080.72776 (29) INSTALL 2700 FEET OF 2 INCH AND 1500 FEET OF 4 INCH POLY ALONG THE STREETS OF TRIPLE DIAMOND SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANSFIELD GROWTH SEPTEMBER 4014 080.72780 20,480 INSTALL 3200 FEET OF 4 INCH POLY AND ABANDON 630 FEET OF 4 INCH AND 620 FEET OF 3 INCH BARE STEEL AND 1900 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION 02 IN GODLEY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GODLEY SYSTEM INTEGRITY OCTOBER 4015 080.72782 483 INSTALL 3,715 FEET OF 4 INCH POLY AND 105 FEET OF 2 INCH POLY ALONG THE STREETS OF SKYLINE ESTATES SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTCHINS GROWTH JUNE 4016 080.72783 629 INSTALL 280 FEET OF 2 INCH, 105 FEET OF 4 INCH AND 2692 FEET OF 6 INCH POLY ALONG VICTORY AT FRONTIER PHASE 1. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PROSPER GROWTH JUNE 4017 080.72784 321,964 INSTALL 4580 FEET OF 4 INCH AND 4735 FEET OF 2 INCH POLY ALONG THE STREETS OF PALMILLA SPRINGS SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER 4018 080.72785 11,506 RELOCATE FACILITIES. INSTALL 1050 FEET OF 2 INCH, 460 FEET OF 4 INCH AND 410 FEET OF 2 INCH POLY ALONG HOUSTON STREET AND RETIRE 400 FEET OF 6 INCH AND 440 FEET OF 4 INCH BARE STEEL AND 336 FEET OF 2 INCH AND 127 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON RELOCATION OF FACILITIES OCTOBER 4019 080.72786 1,898 INSTALL 5017 FEET OF 2 INCH POLY ALONG THE STREETS OF BLUFFVIEW SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JUNE 4020 080.72788 1,437 INSTALL 100 FEET OF 6 INCH POLY ALONG SOUTH MALONE ROAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ALLEN GROWTH JUNE 4021 080.72789 10,078 RELOCATE FACILITIES. INSTALL 35 FEET OF 2 INCH POLY ALONG PEARL AND ABANDON 30 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 4022 080.72795 350 RELOCATE FACILITIES. INSTALL 185 FEET OF 2 INCH POLY AND ABANDON 100 FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY ALONG BROUGHTON STREET TO ACCOMMODATE CITY OF SHERMAN STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES OCTOBER 4023 080.72800 881 INSTALL 3100 FEET OF 2 INCH, AND 2600 FEET OF 4 INCH IP POLY GAS MAIN FOR THE NEW GREENWAY TRAILS PHASE 4 SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GRAND PRAIRIE GROWTH APRIL 4024 080.72801 24,238 REPLACE STEEL SERVICES WITH POLY SERVICES ON MAPSHEET IN BRYAN IN ACCORDANCE WITH RAILROAD COMMISION RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 4025 080.72802 1,728 INSTALL 700 FEET OF 6 INCH AND 2600 FEET OF 4 INCH POLY ALONG THE STREETS OF HARVEST DEVELOPMENT. RESIDENTIAL NORTHLAKE GROWTH OCTOBER 4026 080.72809 12,035 INSTALL 1170 FEET OF 2 INCH POLY AND ABANDON 1121 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 03 ALONG SWEETWATER STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSCOE SYSTEM INTEGRITY OCTOBER 4027 080.72811 260 RELOCATION FACILITIES: INSTALL TAP AND RISER ALONG LINE RFB IN TAYLOR COUNTY TO ACCOMMODATE A RELOCATED MEASURING STATION. ALL CUSTOMERS TUSCOLA RELOCATION OF FACILITIES APRIL 4028 080.72816 321 INSTALL 985 FEET OF 6 INCH POLY ALONG I35. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL GAINESVILLE GROWTH MARCH 4029 080.72819 333,268 RELOCATE FACILITIES. INSTALL 900 FEET OF 4 INCH POLY ALONG IMMANUEL ROAD AND ABANDON 830 FEET OF 4 INCH POLY TO ACCOMMODATE CITY STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PFLUGERVILLE SYSTEM INTEGRITY DECEMBER 4030 080.72825 27,155 INSTALL 930 FEET OF 4 INCH POLY AND 1291 FEET OF 2 INCH POLY AND ABANDON 2000 FEET OF 3 IN STEEL AND 230 FEET OF 2 IN POLY ALONG BARNETT STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER 4031 080.72826 119 INSTALL 600 FEET OF 6 INCH POLY ALONG IH35. ALL CUSTOMERS GAINESVILLE SYSTEM IMPROVEMENT MARCH 4032 080.72829 51,989 INSTALL 1600 FEET OF 12 INCH POLY ALONG STATE HIGHWAY 114. ALL CUSTOMERS FORT WORTH GROWTH JUNE 4033 080.72832 964 REPLACE DISTRICT REGULATOR STATION 04 IN WHITESBORO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITESBORO SYSTEM INTEGRITY OCTOBER 4034 080.72834 242,609 INSTALL 1,100 FEET OF 12 INCH POLY ALONG THE STREETS OF REDDEN FARM SUBDIVISION. ALL CUSTOMERS MIDLOTHIAN GROWTH DECEMBER 4035 080.72835 177,642 INSTALL DISTRICT REGULATOR STATION ALONG LINE L14 AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY OCTOBER 4036 080.72837 44,437 INSTALL 1750 FEET OF 2 INCH POLY ALONG RICKETTS STREET AND ABANDON 1086 FEET OF 2 INCH POLY, 34 FEET OF 2 INCH STEEL, 220 FEET OF 4 INCH STEEL, 200 FEET OF 2 INCH STEEL AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY DECEMBER 4037 080.72839 52,471 INSTALL 1331 FEET OF 2 INCH POLY ALONG THE WATERSIDE TOWNHOMES DEVELOPMENT. RESIDENTIAL FORT WORTH GROWTH MARCH 4038 080.72840 2,333,283 INSTALL 6,945 FEET OF 2 INCH POLY ALONG MISTLETOE DRIVE AND ABANDN 2,035 FEET OF 4 INCH AND 1,285 FEET OF 2 INCH STEEL AND 240 FEET OF 4 INCH AND 5,945 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 4039 080.72841 84,411 INSTALL 6055 FEET 0F 4 INCH AND 1595 FEET OF 2 INCH POLY ALONG THE STREETS OF ELIZABETH CREEK SUBDIVISION. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER 4040 080.72846 4,476 INSTALL 4797 FEET OF 2 INCH AND 1403 FEET OF 4 INCH POLY ALONG THE STREETS OF THE HONEY CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH MARCH 4041 080.72847 373 INSTALL 90 FEET OF 2 INCH POLY ALONG WEST CREEK DRIVE IN DALLAS TX. RESIDENTIAL DALLAS GROWTH JULY 4042 080.72848 288 INSTALL 1880 FEET OF 4 INCH AND 2065 FEET OF 2 INCH POLY ALONG THE STREETS OF NORTH STAR SUBDIVISION. RESIDENTIAL FORT WORTH GROWTH JUNE 4043 080.72849 1,355 INSTALL 1320 FEET OF 4 INCH AND 4200 FEET OF 2 INCH POLY ALONG THE STREETS OF COPPER CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JULY 4044 080.72855 27,792 RELOCATE FACILITIES. INSTALL 380 FEET OF 6 INCH POLY ALONG SOUTH COOPER STREET AND ABANDON 380 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 4045 080.72858 151,048 INSTALL 3,990 FEET OF 2 INCH POLY ALONG THE STREETS OF MILRANY RANCH SUBDIVISION IN COLLIN COUNTY. RESIDENTIAL MELISSA GROWTH SEPTEMBER 4046 080.72860 227,652 INSTALL 3,300 FEET OF 2 INCH AND 1,160 FEET OF 4 INCH POLY ALONG THE STREETS OF LIBERTY IN COLLIN COUNTY RESIDENTIAL MELISSA GROWTH SEPTEMBER MTX Additions Page 122 of 178 341 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4047 080.72861 177,289 INSTALL 2,200 FEET OF 2 INCH AND 890 FEET OF 4 INCH POLY ALONG THE STREETS OF LIBERTY IN COLLIN COUNTY. RESIDENTIAL MELISSA GROWTH JULY 4048 080.72862 147,777 INSTALL 1,980 FEET OF 2 INCH AND 490 FEET OF 4 INCH POLY ALONG THE STREETS OF LIBERTY IN COLLIN COUNTY. RESIDENTIAL MELISSA GROWTH SEPTEMBER 4049 080.72863 22,336 PURCHASE 26 SENSIT GOLD INSTRUMENTS, 103 SENSIT GOLD G2 WITH TC INSTRUMENTS, 2 TRAK-IT WITH TC INSTRUMENTS, AND 90 TRAK-IT IIIA WITH TC INSTRUMENTS IN THE SOUTHEAST REGION. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT JUNE 4050 080.72866 2,549 INSTALL 1000 FEET OF 2 INCH POLY ALONG MODELLA COURT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DALLAS GROWTH MARCH 4051 080.72868 1,755 INSTALL 1536 FEET OF 6 INCH, 1073 FEET OF 4 INCH AND 3200 FEET OF 2 INCH POLY ALONG THE STREETS OF HORIZON LAKE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH APRIL 4052 080.72869 43,801 INSTALL 2800 FEET OF 2 INCH POLY ALONG GLOVER STREET, MULBERRY STREET, NORTH DAVIS STREET AND ABANDON DISTRICT REGULATOR STATION #11 ALONG CHURCH STREET AND GLOVER STREET, 905 FEET OF 4 INCH POLY, 545 FEET OF 4 INCH STEEL, 265 FEET OF 3 INCH POLY, 850 FEET OF 2 INCH STEEL AND 75 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY OCTOBER 4053 080.72871 (4,803) RELOCATE FACILITIES. INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 4 INCH POLY ALONG FREDERICK SQUARE TO ACCOMMODATE A DEVELOPER PROJECT. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES MARCH 4054 080.72872 3,359 RELOCATE FACILITIES. INSTALL 290 FEET OF 2 INCH POLY AND ABANDON 290 FEET OF 2 INCH POLY ALONG FOSSIL CREEK BOULEVARD TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4055 080.72878 71,305 INSTALL 5,235 FEET OF 8 INCH POLY ALONG TX-171 AND CR 1128. ALL CUSTOMERS GODLEY GROWTH JUNE 4056 080.72880 21,496 INSTALL (2) VALVES IN SWEETWATER, TX IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER 4057 080.72883 206 INSTALL 700 FEET OF 6 INCH POLY ALONG HIGHRIDGE TROPHY TRACTOR. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL BURLESON GROWTH JULY 4058 080.72884 1,696 INSTALL 256 FEET OF 2 INCH POLY AND ABANDON 256 FEET OF 2 INCH STEEL ALONG BELKNAP IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NEWCASTLE SYSTEM INTEGRITY OCTOBER 4059 080.72885 205,035 REPLACE 70 STEEL SERVICES WITH POLY SERVICES ALONG MAPSHEET IN ACCORDANCE WITH RAILROAD COMMISION RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 4060 080.72886 86,337 REPLACE STEEL SERVICES WITH POLY SERVICES ALONG STREETS OF BROWNWOOD ON MAPSHEET IN ACCORDANCE WITH RAILROAD COMMISION RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER 4061 080.72888 588 INSTALL 2,236 FEET OF 6 INCH POLY ALONG OLD BURLESON ROAD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH MARCH 4062 080.72889 478,165 INSTALL 2,593 FEET OF 6 INCH AND 2,648 FEET OF 4 INCH AND 4,115 FEET OF 2 INCH POLY ALONG THE STREETS OF GODLEY RANCH SUBDIVISION. RESIDENTIAL GODLEY GROWTH JUNE 4063 080.72891 25,787 INSTALL 4 INCH DISTRICT REGULATOR STATION AND 200 FEET OF 8 INCH POLY AND ABANDON 2 INCH DISTRICT REGULATOR STATION AND 200 FEET OF 6 INCH POLY. ALL CUSTOMERS ROWLETT SYSTEM IMPROVEMENT DECEMBER 4064 080.72899 3,807 INSTALL 5,757 FEET OF 8 INCH POLY ALONG UNIVERSITY BOULEVARD AND CR 110. ALL CUSTOMERS ROUND ROCK GROWTH MARCH 4065 080.72905 40,508 INSTALL 1,960 FEET OF 2 INCH POLY ALONG THE STREETS OF SOUTHERN POINT SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH SEPTEMBER 4066 080.72906 889,141 RELOCATE FACILITIES. INSTALL 2,540 FEET OF 2 INCH AND 960 FEET OF 6 INCH POLY ALONG EAST LOUISIANA STREET AND ABANDON 1,924 FEET OF 2 INCH STEEL AND 848 FEET OF 6 INCH POLY IN MCKINNEY, COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER 4067 080.72910 4,781 REPLACE 420 FEET OF 2 INCH STEEL WITH 420 FEET OF 2 INCH POLY ALONG JEANELL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUITMAN SYSTEM INTEGRITY OCTOBER 4068 080.72912 (65) INSTALL 3360 FEET OF 2 INCH POLY ALONG THE STREETS OF HEARTLAND 17. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH MARCH 4069 080.72914 (185) INSTALL 920 FEET OF 2 INCH POLY ALONG THE STREETS OF HEARTLAND 16B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH JANUARY 4070 080.72921 5,356 INSTALL 900 FEET OF 2 INCH POLY ALONG MAPLE STREET AND ABANDON 670 FEET OF 4 INCH STEEL, 250 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY OCTOBER 4071 080.72922 155 REPLACE PIG TRAP ALONG LINE W22 IN TARRANT COUNTY. ALL CUSTOMERS KELLER SYSTEM INTEGRITY JANUARY 4072 080.72923 1,485 INSTALL 6190 FEET OF 2 INCH POLY ALONG THE STREETS OF CROSS CREEK PHASE 3 AND 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH APRIL 4073 080.72924 837 INSTALL 305 FEET OF 4 INCH POLY ALONG MCKINNEY RANCH PARKWAY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL MCKINNEY GROWTH MARCH 4074 080.72926 111,819 NEW GROUNDBED INSTALLATAION BY MATCOR ON GBS RFB-09 AND RFB-30 IN COLEMAN AND TAYLOR COUNTIES AT 495+23 AND 1538+33. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY JULY 4075 080.72927 2,684 REPLACE GROUNDBED U22-08 ON LINE U22 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCCAULLEY SYSTEM INTEGRITY OCTOBER 4076 080.72928 8,124 REPLACE 3 GROUND BEDS ALONG LINE U IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HAMLIN SYSTEM INTEGRITY OCTOBER 4077 080.72930 384,155 INSTALL 1,000 OF 4 INCH POLY ALONG MOCKINGBIRD AND AIRLINE IN DALLAS AND ABANDON 1,400 FEET OF 16 INCH, 680 FEET OF 12 INCH AND 500 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY DECEMBER 4078 080.72935 113,436 INSTALL 2750 FEET OF 4 INCH POLY AND 1150 FEET OF 2 INCH POLY ALONG RICHLAND AVENUE AND ABANDON 200 FEET OF 2 INCH STEEL, 800 FEET OF 2 INCH POLY AND 1900 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY DECEMBER 4079 080.72947 143 INSTALL 450 FEET OF 2 INCH POLY ALONG WEST FM 93. ALL CUSTOMERS ROGERS GROWTH MARCH 4080 080.72948 188 INSTALL 1700 FEET OF 2 INCH POLY ALONG TROYAN LANE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL TEMPLE GROWTH MARCH 4081 080.72949 (59) REPLACE MEASURING STATION 4613 IN ELLIS AND INSTALL 120 FEET OF 4 INCH STEEL. ALL CUSTOMERS ITALY SYSTEM IMPROVEMENT JANUARY 4082 080.72951 365 INSTALL 1430 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKESIDE VILLAS DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SHADY SHORES GROWTH JUNE 4083 080.72954 64,673 INSTALL 1830 FEET OF 4 INCH POLY AND 620 FEET OF 2 INCH POLY ALONG BELKNAP STREET AND ABANDON 1345 FEET OF 4 INCH STEEL, 445 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 06 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY OCTOBER 4084 080.72956 329 INSTALL 110 FEET OF 6 INCH POLY ALONG WHITESTONE ROAD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL CEDAR PARK GROWTH JUNE 4085 080.72959 9,296 INSTALL 850 FEET OF 4 INCH POLY AND 80 FEET OF 8 INCH STEEL AND ABANDON 93 FEET OF 2 INCH STEEL, 650 FEET OF 4 INCH STEEL AND 845 FEET OF 2 INCH POLY ALONG 8TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER 4086 080.72960 32,691 RELOCATE FACILITIES. INSTALL 3000 FEET OF 4 INCH POLY ALONG OAK STREET AND ABANDON 3000 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FAIRFIELD IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FAIRFIELD RELOCATION OF FACILITIES OCTOBER 4087 080.72965 262 INSTALL 2300 FEET OF 2 INCH POLY ALONG THE STREETS OF CREEK MEADOWS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH JUNE 4088 080.72967 12 INSTALL 3885 FEET OF 4 INCH POLY AND 5085 FEET OF 2 INCH POLY ALONG THE STREETS OF BRIDGEVIEW PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JANUARY 4089 080.72969 7,582 INSTALL 1600 FEET OF 2 INCH POLY ALONG DEPOT STREET AND ABANDON 1205 FEET OF 3 INCH STEEL, 410 FEET OF 3 INCH POLY, 245 FEET OF 4 INCH STEEL AND 10 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DEPORT SYSTEM INTEGRITY OCTOBER 4090 080.72970 60,202 INSTALL 2400 FEET OF 2 INCH POLY AND 100 FEET OF 4 INCH STEEL ALONG BELKNAP STREET AND ABANDON 2900 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY DECEMBER MTX Additions Page 123 of 178 342 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4091 080.72973 32,620 RELOCATE FACILITIES. INSTALL 722 FEET OF 4 INCH POLY AND ABANDON 514 FEET OF 4 INCH STEEL ALONG CRESTLINE ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4092 080.72974 5,673 INSTALL 3000 FEET OF 2 INCH POLY ALONG THE STREETS OF THREE OAKS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SHERMAN GROWTH JULY 4093 080.72975 71,883 RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY AND ABANDON 350 FEET OF 4 INCH STEEL IN THE CITY OF RICHLAND HILLS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS SYSTEM INTEGRITY SEPTEMBER 4094 080.72978 15,181 RELOCATE FACILITIES. INSTALL 75 FEET OF 4 INCH STEEL AND ABANDON 75 FEET OF 4 INCH STEEL ALONG THE STREETS OF RICHLAND HILLS DUE TO CITY OF RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS RELOCATION OF FACILITIES DECEMBER 4095 080.72982 238,219 INSTALL 3,475 FEET OF 2 INCH AND 2,135 FEET OF 3 INCH POLY ALONG THE STREETS OF WOODMERE RESIDENTIAL SUBDIVISION. RESIDENTIAL DENTON GROWTH OCTOBER 4096 080.72983 26,821 INSTALL 4600 FEET OF 2 INCH AND 300 FEET OF 4 INCH POLY ALONG STREETS OF SAN ANGELO AND ABANDON 500 FEET OF 4 INCH STEEL, 2000 FEET OF 4 INCH STEEL AND 200 FEET OF 2 INCH STEEL, 1200 FEET OF 4 INCH, 300 FEET OF 3 INCH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 4097 080.72987 391,508 INSTALL 2,250 FEET OF 2 INCH POLY AND ABANDON 410 FEET OF 2 INCH ADYL A, 250 FEET OF 2 INCH POLY AND 1,590 FEET OF 2 INCH STEEL ALONG THE STREETS OF ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 4098 080.72988 412,380 INSTALL 2,200 FEET OF 6 INCH AND 20 FEET OF 2 INCH POLY AND ABANDON 627 FEET OF 4 INCH, 540 FEET OF 2 INCH POLY AND 165 FEET OF 4 INCH, AND 636 FEET OF 2 INCH STEEL ALONG THE STREETS OF ABILIENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 4099 080.72989 1,021 INSTALL 7150 FEET OF 2 INCH POLY ALONG THE STREETS OF MERRITT VILLAGE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROWLETT GROWTH JULY 4100 080.72990 194,708 INSTALL 1,150 FEET OF 2 INCH POLY AND ABANDON 1,150 FEET OF 2 INCH STEEL ALONG THE STREETS OF ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 4101 080.72991 493,612 INSTALL 2,530 FEET OF 2 INCH POLY ALONG THE STREETS OF ABILENE AND ABANDON 95 FEET OF 4 INCH, 250 FEET OF 2 INCH POLY AND 1,020 FEET OF 2 INCH, 1,165 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 4102 080.73006 238 INSTALL 2,495 FEET OF 2 INCH POLY ALONG THE STREETS OF AUDRA POINTE SUBDIVISION. RESIDENTIAL DENTON GROWTH APRIL 4103 080.73007 11,591 INSTALL 1860 FEET OF 2 INCH POLY AND ABANDON 200 FEET OF 2 INCH POLY AND 1750 FEET OF 2 INCH STEEL ALONG CRAIG STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 4104 080.73018 420,888 INSTALL 675 FEET OF 6 INCH AND 5,600 FEET OF 2 INCH POLY ALONG THE STREETS OF THE HAVEN SUBDIVISION IN WAXAHACHIE, ELLIS COUNTY. RESIDENTIAL WAXAHACHIE GROWTH OCTOBER 4105 080.73019 67,047 INSTALL 4,465 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKE FOREST SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH DECEMBER 4106 080.73023 54,192 INSTALL 900 FEET OF 4 INCH AND 300 FEET OF 2 INCH POLY ALONG THE STREETS OF MIDTOWN RESERVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH SEPTEMBER 4107 080.73024 119,238 INSTALL 3,684 FEET OF 4 INCH POLY AND ABANDON 2,376 FEET OF 4 INCH STEEL, ABANDON 1,308 FEET OF 3 INCH STEEL ALONG SHARON STREET AND GRACE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 4108 080.73025 59,549 RELOCATE FACILITIES. INSTALL 850 FEET OF 4 INCH POLY AND 1811 FEET OF 2 INCH POLY ALONG MEADOWBROOK DRIVE AND ABANDON 672 FEET OF 4 INCH AND 1811 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 4109 080.73026 57,481 RELOCATE FACILITIES. INSTALL 2210 FEET OF 4 INCH POLY. 292 FEET OF 2 INCH POLY AND ABANDON 599 FEET OF 4 INCH STEEL, 1611 FEET OF 3 INCH STEEL, 292 FEET OF 2 INCH STEEL ALONG HIGHLAND TO ACCOMMODATE CITY OF ARLINGTON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 4110 080.73027 177,184 INSTALL 2450 FEET OF 4 INCH AND 698 FEET OF 2 INCH POLY AND ABANDON 2450 FEET OF 4 INCH AND 470 FEET OF 2 INCH STEEL ALONG OVERHILL DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 4111 080.73028 30,748 RELOCATE FACILITIES. INSTALL 1842 FEET OF 2 INCH POLY AND ABANDON 1592 FEET OF 2 INCH STEEL ALONG JOYCE STREET TO ACCOMMODATE CITY OF ARLINGTON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 4112 080.73029 34,745 INSTALL 346 FEET OF 4 INCH AND 587 FEET OF 2 INCH POLY AND ABANDON 293 FEET IF 4 INCH AND 587 FEET OF 2 INCH STEEL ALONG OVERHILL DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 4113 080.73030 171,293 INSTALL 643 FEET OF 4 INCH POLY AND 2245 FEET OF 2 INCH POLY ALONG HIGHLAND DRIVE AND ABANDON 634 FEET OF 4 INCH STEEL AND 2245 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 4114 080.73031 74,829 RELOCATE FACILITIES. INSTALL 1503 FEET OF 4 INCH AND 1124 FEET OF 2 INCH POLY ALONG BROWNING DRIVE AND ABANDON 845 FEET OF 4 INCH, 658 FEET OF 3 INCH AND 986 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 4115 080.73032 77,773 INSTALL 2665 FEET OF 4 INCH POLY ALONG STREETS OF ARLINGTON AND ABANDON 1033 FEET OF 4 INCH AND 1518 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 4116 080.73033 75,531 INSTALL 1,832 FEET OF 4 INCH POLY, 593 FEET OF 2 INCH POLY AND ABANDON 155 FEET OF 6 INCH STEEL, 1,585 FEET OF 4 INCH STEEL, 457 FEET OF 2 INCH STEEL ALONG EDNA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 4117 080.73039 23,307 INSTALL 650 FEET OF 2 INCH POLY MAIN ALONG TRADITION TRAIL. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PLANO GROWTH MARCH 4118 080.73046 347 INSTALL 1540 FEET OF 4 INCH POLY ALONG MIDWAY ROAD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL HALTOM CITY GROWTH APRIL 4119 080.73050 8,444 INSTALL 5372 FEET OF 2 INCH, 1961 FEET OF 4 INCH AND 518 FEET OF 12 INCH POLY ALONG THE STREETS OF THE TRINITY FALLS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH MARCH 4120 080.73053 37,966 INSTALL 450 FEET OF 6 INCH, 1,120 FEET OF 4 INCH, AND 1,050 FEET OF 2 INCH POLY AND ABANDON 537 FEET OF 4 IN, 1210 FEET OF 2 IN STEEL AND 278 FEET OF 6 IN, AND 371 FEET OF 3 IN POLY ALONG MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 4121 080.73058 5,100 INSTALL 710 FEET OF 2 INCH POLY ALONG STREETS OF FORT WORTH AND ABANDON 240 FEET OF 4 INCH STEEL AND 200 FEET OF 4 INCH CAST IRON AND 185 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4122 080.73061 481 INSTALL 1000 FEET OF 4 INCH POLY ALONG STREETS OF BALCH SPRINGS. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL BALCH SPRINGS GROWTH JUNE 4123 080.73068 11,507 INSTALL 485 FEET OF 4 INCH POLY AND 2225 FEET OF 2 INCH POLY AND ABANDON 300 FEET OF 3 INCH POLY, 1500 FEET OF 4 INCH STEEL, 640 FEET OF 4 INCH STEEL AND 680 FEET OF POLY ALONG MCDONALD STREET AND EAST 3RD STREET IN ACCORDANCE WITH THE TEXAS RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY DECEMBER 4124 080.73070 21,441 REPAIR DENT WITH GOUGE ALONG LINE CA(2ND) WEST IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANCTUARY SYSTEM INTEGRITY OCTOBER 4125 080.73071 44,664 INSTAL DISTRICT REGULATOR STATION 01, 100 FEET OF 6 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 01, 100 FEET OF 2 INCH POLY ALONG LINE 028-1. ALL CUSTOMERS SACHSE SYSTEM IMPROVEMENT MARCH MTX Additions Page 124 of 178 343 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4126 080.73079 6,626 INSTALL 376 FEET OF 4 INCH AND 8.249 FEET OF 2 INCH POLY ALONG THE STREETS OF WOLF RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH JULY 4127 080.73083 40,329 INSTALL 2225 FEET OF 6 INCH POLY ALONG TRAIL LAKE DRIVE AND ABANDON 2225 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4128 080.73086 157 INSTALL 325 FEET OF 4 INCH POLY AND 250 FEET OF 2 INCH POLY ALONG SOUTHWEST PARKWAY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH MARCH 4129 080.73088 2,435 RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH POLY ALONG DARCY STREET AND ABANDON 475 FEET OF 4 INCH AND 285 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4130 080.73089 62,955 INSTALL DISTRICT REGULATOR STATION 02, 140 FEET OF 2 INCH POLY ABANDON 140 FEET OF 2 INCH STEEL, DISTRICT REGULATOR STATION 02 ALONG BENNIE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWENA SYSTEM INTEGRITY JUNE 4131 080.73091 7,378 INSTALL 1,600 FEET OF 2 INCH POLY ALONG THE STREETS OF CANTRO TRACE AND LIBERO LANE IN TRAVISSO SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER 4132 080.73094 13,982 RELOCATE FACILITIES. INSTALL 2292 FEET OF 6 INCH POLY AND ABANDON 1782 FEET OF 6 INCH STEEL AND 674 FEET OF 6 INCH POLY ALONG US82 TO ACCOMMODATE CITY OF NOCONA HIGHWAY PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA RELOCATION OF FACILITIES OCTOBER 4133 080.73098 5,888 REPLACE 347 FEET OF 2 INCH STEEL, 170 FEET OF 2 INCH POLY AND 100 FEET OF WITH 540 FEET OF POLY AND 100 OF 2 INCH POLY ALONG WALNUT IN ACCORDANCE WTH THE RAIROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 4134 080.73107 23,227 INSTALL 1090 FEET OF 2 INCH POLY AND ABANDON 295 FEET OF 2 INCH STEEL, 809 FEET DUPONT, 53 FEET OF 2 INCH POLY, DISTRICT REGULATOR STATION 030 ALONG 14TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 4135 080.73110 66 INSTALL 175 FEET OF 2 INCH POLY ALONG GOUGH STREET. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH MARCH 4136 080.73111 32,777 INSTALL 1040 FEET OF 2 INCH POLY AND ABANDON 48 FEET OF 2 INCH POLY, 211 FEET OF 2 INCH POLY, 11 FEET OF 3 INCH POLY, 322 FEET OF 2 INCH STEEL, 1006 FEET OF 3 INCH STEEL, AND DISTRICT REGULATOR STATION 07 ALONG THE STREETS OF GRANBURY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY DECEMBER 4137 080.73112 15,807 INSTALL 860 FEET OF 2 INCH POLY, 895 FEET OF 4 INCH POLY AND ABANDON 185 FEET OF 4 INCH STEEL, 215 FEET OF 3 INCH STEEL, 335 FEET OF 3 INCH POLY, 632 FEET OF 2 INCH POLY, 1,318 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 4138 080.73114 34,473 INSTALL 1,856 FEET OF 6 INCH, 5,548 FEET OF 4 INCH, 7,131 FEET OF 2 INCH POLY ALONG THE STREETS OF HIGHLAND VILLAGE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER 4139 080.73123 65,219 INSTALL 1,865 FEET OF 2 INCH POLY ALONG THE STREETS OF BEL GRAND ESTATES SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HASLET GROWTH OCTOBER 4140 080.73131 183 INSTALL 1,449 FEET OF 4 INCH POLY ALONG HIDDEN VISTA BOULEVARD. ALL CUSTOMERS BURLESON GROWTH JUNE 4141 080.73133 748 INSTALL 1500 FEET OF 2 INCH POLY ALONG THE STREETS OF MISSION RANCH PHASE 202. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH APRIL 4142 080.73134 (68) INSTALL 200 FEET OF 2 INCH POLY ALONG N 3RD STREET. RESIDENTIAL PRINCETON GROWTH MARCH 4143 080.73135 2,753 INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 375 FEET OF 2 INCH STEEL AND 12 FEET OF 2 INCH POLY ALONG ALDINE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY OCTOBER 4144 080.73137 7,212 INSTALL 965 FEET OF 2 INCH POLY ALONG CALVERT STREET AND ABANDON 1130 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY OCTOBER 4145 080.73138 177,103 INSTALL 2020 FEET OF 4 INCH POLY AND 2000 FEET OF 2 INCH POLY ALONG THE STREETS OF PIONEER POINT SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH APRIL 4146 080.73139 1,298 INSTALL 4,387 FEET 0F 2 INCH POLY AND 1,832 FEET OF 4 INCH POLY ALONG THE STREETS OF HIGH COUNTRY SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BURLESON GROWTH JULY 4147 080.73140 2,211 RELOCATE FACILITIES. INSTALL 250 FEET OF 2 INCH POLY ALONG SW MAIN STREET AND ABANDON 250 FEET OF 2 INCH STEEL TO ACCOMMODATE TXDOT CULVERT REPLACEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS RELOCATION OF FACILITIES OCTOBER 4148 080.73141 43,991 INSTALL 1,260 FEET OF 8 INCH, 702 FEET OF 4 INCH AND 4.156 FEET OF 2 INCH POLY ALONG THE STREETS OF STAUNTON DRIVE AND MACARTHUR DRIVE IN LARKSPUR SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH OCTOBER 4149 080.73142 24,382 INSTALL 305 FEET OF 4 INCH AND 2,395 FEET OF 2 INCH POLY ALONG THE STREETS OF STAUNTON DRIVE IN LARKSPUR SUBDIVISION. DEVELOP INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH OCTOBER 4150 080.73143 2,101,920 INSTALL 1,859 FEET OF 6 INCH AND 5,757 FEET OF 12 INCH POLY ALONG COIT ROAD IN LEXINGTON PARKS SUBDIVISION. ALL CUSTOMERS FRISCO GROWTH OCTOBER 4151 080.73147 5,567 INSTALL 35 FEET OF 4 INCH, 10 FEET OF 4 INCH, AND 25 FEET OF 2 INCH POLY AND ABANDON 25 FEET OF 4 INCH STEEL, 15 FEET OF 2 INCH POLY, 10 FEET OF POLY AND DRS12 AT SUNSET DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 4152 080.73148 1,362 RELOCATE FACILITIES. INSTALL 240 FEET OF 6 INCH POLY AND 250 FEET OF 4 INCH POLY AND ABANDON 240 FEET OF 6 INCH POLY AND 140 FEET OF 4 INCH POLY ALONG DAY MIAR ROAD TO ACCOMMODATE MANSFIELD CITY STREETS PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD RELOCATION OF FACILITIES OCTOBER 4153 080.73153 140,929 INSTALL 4252 FEET OF 2 INCH POLY ALONG THE STREETS OF SUN CITY SUBDIVISION. DEVELOPER INSTALLED FACILITIES RESIDENTIAL GEORGETOWN GROWTH JULY 4154 080.73155 3,115 RELOCATE FACILITIES. INSTALL 12 FEET OF 2 INCH POLY AND ABANDON 6 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAD STORM SEWER PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 4155 080.73158 12,805 RELOCATE FACILITIES. INSTALL 1230 FEET OF 6 INCH POLY AND ABANDON 1205 FEET OF 6 INCH POLY ALONG FM 156 TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4156 080.73159 288,426 INSTALL 637 FEET OF 2 INCH, 352 FEET OF 4 INCH POLY ALONG MORSE STREET, JACKSON STREET AND HILL ALLEY STREET IN DENTON AND ABANDON 833 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER 4157 080.73163 1,632 RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY ALONG MELBA AND ABANDON 60 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 4158 080.73164 481,605 RELOCATE FACILITIES. INSTALL 3,100 FEET OF 2 INCH POLY ALONG HAVENHURST AND NESTLE DR AND ABANDON 2,950 FEET OF 2 INCH STEELAND 150 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY SEPTEMBER 4159 080.73165 4,511 INSTALL 925 FEET OF 2 INCH POLY ALONG THE STREETS OF WILDERNESS MOBILE HOME PARK SUBDIVISION AND ABANDON 906 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER 4160 080.73169 91,909 RELOCATE FACILITIES. INSTALL 1400 FEET OF 12 INCH POLY, 10 FEET OF 6 INCH POLY, 70 FEET OF 4 INCH POLY, 50 FEET OF 2 INCH POLY ALONG E TERRELL AND ABANDON 1400 FEET OF 10 INCH STEEL, 10 FEET OF 6 INCH POLY, 10 FEET OF 4 INCH POLY, 10 FEET OF 3 INCH POLY TO ACCOMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4161 080.73171 117,570 INSTALL 1,700 FEET OF 4 INCH, 2,060 FEET OF 2 INCH POLY ALONG THE STREETS OF WEST END SUBDIVISION IN MCGREGOR IN MCLENNAN COUNTY. RESIDENTIAL MC GREGO GROWTH DECEMBER MTX Additions Page 125 of 178 344 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4162 080.73173 81,001 RELOCATE FACILITIES. INSTALL 356 FEET OF 6 INCH POLY AND ABANDON 340 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF IRVING STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 4163 080.73174 1,190 RELOCATE FACILITES. INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 183 FEET OF 2 INCH POLY ALONG SHEPHERD STREET TO ACCOMMODATE CITY OF IRVING STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 4164 080.73175 13,621 INSTALL 7.264 FEET OF 2 INCH AND 568 FEET OF 4 INCH POLY ALONG THE STREETS OF COLLINSBROOK FARMS SUBDIVISION IN FRISCO, COLLIN COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH DECEMBER 4165 080.73182 2,241,825 INSTALL 5,600 FEET OF 4 INCH, 2,100 FEET OF 2 INCH POLY ALONG IRVING BOULEVARD BETWEEN SOWERS ROAD AND STRICKLAND PLAZA IN IRVING AND ABANDON 4,455 FEET OF 4 INCH, 68 FEET OF 3 INCH, 621 FEET OF 1.25 INCH, 84 FEET OF 2 INCH STEEL AND 283 FEET OF 4 INCH, 284 FEET OF 3 INCH, 1,147 FEET OF 2 INCH AND 885 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER 4166 080.73183 4,556 INSTALL 4,805 FEET OF 4 INCH AND 4,100 FEET OF 2 INCH POLY ALONG STREETS OF BROADMOOR ESTATES SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL OVILLA GROWTH APRIL 4167 080.73184 451 INSTALL 2,110 FEET OF 4 INCH AND 4,160 FEET OF 2 INCH POLY ALONG THE STREETS OF OAKMONT PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL RED OAK GROWTH MARCH 4168 080.73192 1,662,850 INSTALL 10,000 FEET OF 8 INCH POLY AND 331 FEET OF STEEL CASING ALONG THE STREETS OF THE OAKS SUBDIVISION. ALL CUSTOMERS RED OAK GROWTH SEPTEMBER 4169 080.73193 48,879 INSTALL 3,800 FEET OF 4 INCH AND 540 FEET OF 2 INCH POLY ALONG THE STREETS OF KELLER. COMMERCIAL OR INDUSTRIAL KELLER GROWTH SEPTEMBER 4170 080.73194 72,116 INSTALL 1607 FEET OF 2 INCH POLY AND 2316 FEET OF 4 INCH POLY STREETS OF HILLSBORO AND ABANDON 1688 FEET OF 4 INCH STEEL, 188 FEET OF 3 INCH STEEL, 947 FEET OF 2 INCH STEEL AND 422 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 4171 080.73199 1,230 INSTALL 2500 FEET OF 2 INCH, AND 3500 FEET OF 4 INCH POLY ALONG THE NEW GREENWAY TRAILS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GRAND PRAIRIE GROWTH JUNE 4172 080.73210 488 REPLACE (3) DEPLETED GROUNDBEDS IN THE CITY OF LAKEPORT AT THE AAA MOBILE HOME PARK IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKEPORT SYSTEM INTEGRITY OCTOBER 4173 080.73214 3,013 INSTALL 715 FEET OF 2 INCH POLY ALONG THE STREETS OF NORTHBROOK PLACE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PLANO GROWTH JUNE 4174 080.73215 54 INSTALL 100 FEET OF 2 INCH POLY ALONG BLUEBONNET STREET. ALL CUSTOMERS FREDERICKSBURG GROWTH MARCH 4175 080.73216 70,211 INSTALL 700 FEET OF 6 INCH, 1,600 FEET OF 4 INCH AND 3,000 FEET OF 2 INCH POLY ALONG THE STREETS OF MIRA LOGO CROSSING SUBDIVISION IN MANSFIELD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GRAND PRAIRIE GROWTH DECEMBER 4176 080.73220 2,433 INSTALL 1560 FEET OF 2 INCH POLY ALONG THE STREETS OF OLD TOWN EAST DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH DECEMBER 4177 080.73221 23,998 INSTALL 525 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 5, 50 FEET OF 4 INCH STEEL, 390 FEET OF 3 INCH STEEL, 450 FEET OF 4 INCH POLY AND 720 FEET OF 2 INCH POLY ALONG MARBLE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WYLIE SYSTEM INTEGRITY OCTOBER 4178 080.73224 8,122 INSTALL 2300 FEET OF 2 INCH POLY ALONG 5TH STREET AND ABANDON DISTRICT REGULATOR STATION 02, 670 FEET OF 2 INCH STEEL, 1045 FEET OF 3 INCH STEEL, 40 FEET OF 3 INCH STEEL, 120 OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CRANDALL SYSTEM INTEGRITY OCTOBER 4179 080.73225 75,432 INSTALL 3175 FEET OF 2 INCH AND 873 FEET OF 4 INCH POLY ALONG THE STREETS OF LEXINGTON PARKS SUBDIVISION. RESIDENTIAL FRISCO GROWTH JUNE 4180 080.73226 34,017 INSTALL 1060 FEET OF 2 INCH POLY ALONG STREETS OF MESQUITE AND ABANDON 925 FEET OF 2 INCH STEEL, 955 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION 03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY OCTOBER 4181 080.73228 30,517 INSTALL 2200 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 9, 710 FEET OF 4 INCH STEEL, 1215 FEET OF 3 INCH STEEL, 450 FEET OF 4 INCH POLY AND 430 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 4182 080.73230 17,450 INSTALL (2) 8 INCH 3-WAY TEES, (2) 8 INCH TRANSITIONS, (1) 8 INCH POLY VALVE, 340 FEET OF 8 INCH POLY ALONG WYCLIFF AND ABANDON 340 FEET OF 10 INCH STEEL WITH ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4183 080.73233 12,518 INSTALL (1) 12 INCH X16 INCH SHORT STOP, (2) 10 INCH 3-WAY TEES, (3) 12 INCH TRANSITIONS, (1) 12 INCH POLY VALVE , 20 FEET OF 12 INCH POLY ALONG DOUGLAS STREET AND HAWTHORNE STREET AND ABANDON 20 FEET OF 10 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4184 080.73235 3,709 INSTALL 554 FEET OF 2 INCH POLY ALONG HERO WAY IN LEANDER, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL LEANDER GROWTH JUNE 4185 080.73238 109,505 INSTALL (1) 12 INCH X16 INCH FOLDING SHORT STOP, (1) 10 INCH 3 WAY TEE, (2) 12 INCH TRANSITIONS, (1) 12 INCH POLY VALVE, 55 FEET OF 12 INCH POLY AND ABANDON 55 FEET OF 16 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4186 080.73241 42,801 INSTALL (2) SPHERICAL TEES, (2) 12 INCH TRANSITIONS, (1) 12 INCH POLY VALVE, AND 35 FEET OF 12 INCH POLY AND ABANDON 35 FEET OF 12 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY DECEMBER 4187 080.73245 226,079 INSTALL 2400 FEET OF 4 INCH POLY ALONG SPRING PARK AND ABANDON 2400 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 4188 080.73246 76,784 INSTALL 2200 FEET OF 4 INCH POLY ALONG JUPITER AND ABANDON 2200 OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 4189 080.73247 3,113 INSTALL 680 FEET OF 6 INCH, 360 FEET OF 4 INCH, AND 3455 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKES AT RIVER TRAILS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JUNE 4190 080.73251 133 INSTALL 144 FEET OF 6 INCH POLY ALONG COUNTY ROAD 180. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL CEDAR PARK GROWTH APRIL 4191 080.73252 7,610 INSTALL 910 FEET OF 2 INCH POLY ALONG THE STREETS OF VIZCAYA SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER 4192 080.73253 564 INSTALL 2300 FEET OF 2 INCH POLY ALONG THE STREETS OF EDEN TERRANCE SUBDIVISION. RESIDENTIAL ARLINGTON GROWTH JUNE 4193 080.73254 51,334 RELOCATE FACILITIES. INSTALL 8 POLY SERVICES AND ABANDON 8 POLY SERVICES ALONG WESTCLIFF TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4194 080.73255 12,700 INSTALL 5180 FEET OF 2 INCH POLY ALONG THE STREETS OF THE RESERVE AT NORTH FORK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JUNE 4195 080.73256 801 INSTALL 2190 FEET OF 4 INCH AND 2860 FEET OF 2 INCH POLY ALONG THE STREETS OF SONOMA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH APRIL 4196 080.73257 520 INSTALL 3645 FEET OF 4 INCH POLY ALONG THE STREETS OF SONOMA VERDE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH JUNE 4197 080.73259 1,832 INSTALL 10 FEET OF 6 INCH POLY AND ABANDON 10 FEET OF 6 INCH POLY ALONG BLUFF AND 10TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 4198 080.73260 762 INSTALL RELIEF VALVE ALONG COLLEGE STREET AND ABANDON RELIEF VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE SYSTEM INTEGRITY OCTOBER 4199 080.73261 52,861 INSTALL 3482 FEET OF 2 INCH AND 879 FEET OF 6 INCH POLY ALONG THE STREETS OF LEXINGTON PARKS SUBDIVISION. RESIDENTIAL FRISCO GROWTH JUNE 4200 080.73263 (28) INSTALL 235 FEET OF 2 INCH POLY ALONG 2200 BLOCK OF NORTH VILLAGE DRIVE IN BONHAM. RESIDENTIAL BONHAM GROWTH JANUARY MTX Additions Page 126 of 178 345 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4201 080.73265 18,785 REPLACE 119 STEEL SERVICES WITH POLY SERVICES ON MAPSHEET #AM249372 IN BRYAN IN ACCORDANCE WITH RAILROAD COMMISION RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 4202 080.73266 18,451 REPLACE 84 STEEL SERVICE LINES IN BRYAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 4203 080.73267 10,603 INSTALL 2150 FEET OF 2 INCH POLY ALONG CHURCH STREET AND ABANDON DISTRICT REGLUATOR STATION AND 2150 FEET STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LITTLE RIVER ACADEMY SYSTEM INTEGRITY OCTOBER 4204 080.73269 185,256 INSTALL 2,590 FEET OF 2 INCH AND 2,675 FEET OF 4 INCH POLY ALONG THE STREETS OF KINGS RIDGE SUBDIVISION IN DENTON. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH OCTOBER 4205 080.73273 79,410 INSTALL 3000 FEET OF 2 INCH POLY ALONG STREETS OF MESQUITE AND ABANDON 390 FEET OF 3 INCH CAST IRON, 1661 FEET OF 3 INCH STEEL AND 849 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY DECEMBER 4206 080.73283 5,818 INSTALL 900 FEET OF 2 INCH POLY AND ALONG GREY STREET AND ABANDON DISTRICT REGULATOR STATION 01, 525 FEET OF 4 INCH POLY, 350 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DEPORT SYSTEM INTEGRITY OCTOBER 4207 080.73284 6,432 INSTALL 100 FEET OF 2 INCH POLY ALONG PRAIRIE AVENUE. RESIDENTIAL DALLAS GROWTH APRIL 4208 080.73285 80,973 INSTALL 4.384 FEET OF 2 INCH POLY ALONG COIT ROAD AND CHARISMATIC PARKWAY IN LEXINGTON PARKS SUBDIVISION IN FRISCO, COLLIN COUNTY, RESIDENTIAL FRISCO GROWTH DECEMBER 4209 080.73286 15,578 INSTALL 3406 FEET OF 6 INCH, 900 FEET OF 4 INCH, AND 6298 FEET OF 2 INCH POLY ALONG THE STREETS OF BROOKLANDS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH JULY 4210 080.73288 5,459 INSTALL 1175 FEET OF 4 INCH POLY, 390 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 35, 230 FEET OF 4 INCH STEEL AND 460 FEET OF 2 INCH POLY AND 165 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER 4211 080.73293 2,261 RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY ALONG MONETARY LANE AND ABANDON 100 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON RELOCATION OF FACILITIES OCTOBER 4212 080.73297 24,854 RELOCATE FACILITIES. INSTALL 80 FEET OF 4 INCH POLY, 900 FEET OF 6 INCH POLY, 45 FEET OF 8 INCH POLY, 20 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 17 FEET 4 INCH STEEL, 53 FEET OF 6 INCH CAST IRON, 365 FEET OF 6 INCH STEEL, 459 FEET OF 6 INCH POLY, 44 FEET OF 8 INCH STEEL, 12 FEET OF 2 INCH POLY, 55 FEET OF 4 INCH POLY, 16 FEET OF 6 INCH STEEL TO ACCOMODATE THE CITY OF FORT WORTH SEWAR PROJECT. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4213 080.73300 85,117 INSTALL 2176 FEET OF 2 INCH POLY AND 1005 FEET OF 4 INCH POLY ALONG STREETS OF HILLSBORO AND ABANDON 312 FEET OF 3 INCH POLY, 1355 FEET OF VARIOUS SIZE STEEL AND 1582 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY NOVEMBER 4214 080.73301 13 INSTALL 1927 FEET OF 2 INCH POLY ALONG THE STREETS OF HOMESTEAD PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JANUARY 4215 080.73304 3,366 INSTALL 135 FEET OF 2 INCH POLY ALONG THE STREET OF MANSIONS CLUBHOUSE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL UNINCORPORATED GROWTH JUNE 4216 080.73305 52 INSTALL 390 FEET OF 2 INCH POLY ALONG COPPERFIELD DRIVE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH JUNE 4217 080.73306 5,332 RELOCATE FACILITIES. INSTALL 340 FEET OF 2 INCH POLY AND ABANDON 340 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF WACO STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 4218 080.73308 26,396 INSTALL 1,780 FEET OF 4 INCH, 30 FEET OF 6 INCH AND 60 FEET OF 2 INCH POLY AND ABANDON 1,340 FEET OF 4 INCH, 30 FEET OF 6 INCH, 390 FEET OF 3 INCH, AND 80 FEET OF 2 INCH STEEL ALONG MULBERRY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARCHER CITY SYSTEM INTEGRITY OCTOBER 4219 080.73309 10,943 RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH POLY AND ABANDON 345 FEET OF 2 INCH POLY TO ACCOMODATE THE CITY OF SEAGOVILLE STREET IMPROVEMENT PROJECT. ALL CUSTOMERS SEAGOVILLE RELOCATION OF FACILITIES OCTOBER 4220 080.73315 733,653 INSTALL 2,200 FEET OF 6 INCH POLY ALONG CURTIS AND ALVORD IN QUANAH AND ABANDON 2,000 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY DECEMBER 4221 080.73322 1,654,344 INSTALL 3,135 FEET OF 8 INCH, 409 FEET OF 4 INCH, AND 2,358 FEET OF 2 INCH POLY ALONG MACARTHUR BOULEVARD IN IRVING AND ABANDON 3,135 FEET OF 8 INCH, 494 FEET OF 4 INCH, AND 448 FEET OF 2 INCH STEEL AND 80 FEET OF 4 INCH, 229 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER 4222 080.73326 801 INSTALL 180 FEET OF 2 INCH POLY ALONG NAVARRO STREET. RESIDENTIAL RICHLAND GROWTH JULY 4223 080.73327 1,480 RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY ALONG PRESTON ROAD AND ABANDON 292 FEET OF 4 INCH STEEL AND 49 FEET OF 4 POLY TO ACCOMODATE THE CITY OF SHERMAN STREET IMPROVEMENT PROJECT. ALL CUSTOMERS VAN ALSTYNE RELOCATION OF FACILITIES OCTOBER 4224 080.73328 215,755 INSTALL 2,485 FEET OF 4 INCH AND 3,970 FEET OF 2 INCH POLY ALONG STREETS OF HAMPTON PARK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GLENN HEIGHTS GROWTH SEPTEMBER 4225 080.73329 142,592 RELOCATE FACILITIES.&NBSP; INSTALL 347 FEET OF 6 INCH POLY ALONG AVENUE A NEAR 4TH STREET AND ABANDON 226 FEET OF 6 INCH POLY DUE TO CITY OF TEMPLE PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY SEPTEMBER 4226 080.73335 285 INSTALL 2585 FEET OF 2 INCH POLY MAIN ALONG THE STREETS OF VILLAS OF MIDDLETON PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PLANO GROWTH MARCH 4227 080.73342 144,348 INSTALL 123 FEET OF 4 INCH POLY ALONG 5TH STREET AND MAIN STREET AND ABANDON FRISCO DISTRICT REGULATOR STATION #01, 64 FEET OF 4 INCH STEEL AND 3 FEET OF 4 INCH, 38 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO SYSTEM INTEGRITY SEPTEMBER 4228 080.73343 1,792 RELOCATE FACILITIES. INSTALL 750 FEET OF 6 INCH POLY AND ABANDON 650 FEET OF 6 INCH STEEL ALONG WINBROOK DRIVE TO ACCOMMODATE CITY OF BENBROOK STREETS PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK RELOCATION OF FACILITIES OCTOBER 4229 080.73347 3,382 REPLACE DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER 4230 080.73348 2,186 INSTALL 190 FEET OF 4 INCH AND 100 FEET OF 2 INCH POLY ALONG NORTH COUNTY ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FRISCO GROWTH MARCH 4231 080.73349 0 INSTALL 225 FEET OF 2 INCH POLY ALONG COLLEGE AVENUE. COMMERCIAL OR INDUSTRIAL SNYDER GROWTH JANUARY 4232 080.73350 16,382 INSTALL 350 FEET OF 4 INCH AND 1120 FEET OF 2 INCH POLY ALONG THE STREETS OF THE MERDIAN SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SAN ANGELO GROWTH MARCH 4233 080.73351 (66) INSTALL 1520 FEET OF 2 INCH POLY ALONG THE STREETS OF FAIRWAYS AT CRYSTAL FALLS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH MARCH 4234 080.73352 958,394 INSTALL 1,309 FEET OF 8 INCH STEEL ALONG SMOTHERMAN ROAD IN LITTLE ELM AND ABANDON 1,266 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LITTLE ELM SYSTEM INTEGRITY DECEMBER 4235 080.73358 46,869 RELOCATE FACILITIES. INSTALL 1900 FEET OF 4 INCH POLY ALONG SYMPHONY LANE AND ABANDON 1900 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 4236 080.73361 4,184 RELOCATE FACILITIES. INSTALL 50 OF 8 INCH POLY ALONG PACIFIC STREET AND ABANDON 50 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 4237 080.73362 271 RELOCATE FACILITIES. INSTALL 25 FEET OF 4 INCH POLY AND RETIRE 15 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER MTX Additions Page 127 of 178 346 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4238 080.73371 298,816 INSTALL 1950 FEET OF 2 INCH, 500 FEET OF 4 INCH AND 3950 FEET OF 6 INCH POLY AND ABANDON 190 FEET OF 3 INCH, 2015 FEET OF 4 INCH, 450 FEET OF 4 INCH STEEL, 50 FEET OF 6 INCH POLY, 4760 FEET OF 8 INCH POLY AND 390 FEET OF 8 INCH STEEL AND DISTRICT REGULATOR STATION 93 ALONG SAMUEL BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4239 080.73372 (48,696) PURCHASE 375 LINE LOCATORS FOR USE IN NORTH REGION. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT JUNE 4240 080.73375 265,261 INSTALL 5,630 FEET OF 2 INCH AND 1,350 FEET OF 6 INCH POLY ALONG THE STREETS OF THE MEADOW RUN SUBDIVISION IN MELISSA, COLLING COUNTY. RESIDENTIAL MELISSA GROWTH DECEMBER 4241 080.73379 2,497 INSTALL 300 FEET OF 4 INCH POLY AND 15 FEET OF 2 INCH POLY AND ABANDON 3 INCH STEEL ALONG WOOD STREET AND MANSARD STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER 4242 080.73380 107 INSTALL 40 FEET OF 4 INCH POLY ALONG JUDGE ELY. COMMERCIAL OR INDUSTRIAL ABILENE GROWTH APRIL 4243 080.73382 615 INSTALL 545 FEET OF 6 INCH, 2110 FEET OF 4 INCH, AND 1090 FEET OF 2 INCH POLY ALONG THE STREETS OF PEBBLE CREEK DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH MARCH 4244 080.73384 2,075 RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG ARTERIAL H AND REMOVE 98 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF ROUND ROCK IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK RELOCATION OF FACILITIES OCTOBER 4245 80.73386 1,983 INSTALL 950 FEET OF 2 INCH POLY ALONG BURNSIDE DRIVE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL WICHITA FALLS GROWTH JUNE 4246 080.73387 64,474 RELOCATE FACILITIES. INSTALL 910 FEET OF 6 INCH POLY ALONG LEGACY DRIVE AND ABANDON 910 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF PLANO IMPROVMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES OCTOBER 4247 080.73388 25,434 RELOCATE FACILITIES. INSTALL 600 FEET OF 8 INCH POLY AND ABANDON 417 FEET OF 4 INCH STEEL AND 60 FEET OF 4 INCH POLY ALONG HIGHWAY 83-84 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE RELOCATION OF FACILITIES DECEMBER 4248 080.73389 743 RELOCATE FACILITIES. INSTALL 250 FEET OF 2 INCH POLY AND ABANDON 250 FEET OF 2 INCH STEEL ALONG COUNTRY CLUB ROAD TO ACCOMATE THE CITY OF ENNIS STEET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS RELOCATION OF FACILITIES OCTOBER 4249 080.73390 253,790 INSTALL 2,200 FEET OF 6 INCH POLY ALONG BLUE MOUND ROAD AND ABANDON 2,130 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HASLET SYSTEM INTEGRITY SEPTEMBER 4250 080.73391 1,788 INSTALL 636 FEET OF 2 INCH POLY ALONG WINDY PARK DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH MARCH 4251 080.73393 2,300,598 CONSTRUCT NEW OFFICES, RESTROOMS, AND CONFERENCE ROOMS IN THE ROUND ROCK SERVICE CENTER IN WILLIAMSON COUNTY TO ACCOMMODATE THE INCREASED STAFFING LEVELS REQUIRED TO SUPPORT THE GROWING OPERATIONS, MAINTENANCE, AND CAPITAL CONSTRUCTION ACTIVITIES IN THE AREA. THE PROJECTS ALSO INCLUDES THE REPLACEMENT OF THE HVAC AND ELECTRICAL SYSTEM TO COMPLY WITH THE CURRENT ENERGY CODE REQUIREMENTS TO MAINTAIN LEED CERTIFICATION. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER 4252 080.73399 9,838,806 INSTALL 9 MILES OF 8 INCH POLY ALONG SH 29 IN LIBERTY HILL, WILLIAMSON COUNTY. ALL CUSTOMERS GEORGETOWN SYSTEM IMPROVEMENT DECEMBER 4253 080.73405 16,033 INSTALL 2350 FEET OF 2 INCH POLY AND ABANDON 1030 FEET OF 4 INCH STEEL, 1320 FEET OF 3 INCH STEEL, AND DISTRICT REGULATOR STATION 16 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY OCTOBER 4254 080.73406 8,599 INSTALL 2400 FEET OF 2 INCH POLY ALONG EAST TRAVIS STREET AND ABANDON 1150 FEET OF 2 INCH POLY, 1280 FEET OF 2 INCH STEEL, DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOLLAND SYSTEM INTEGRITY OCTOBER 4255 080.73407 19,632 INSTALL 336 FEET OF 2 INCH POLY 1183 OF 4 INCH POLY AND ABANDON 1300 FEET OF 3 INCH STEEL, 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS COPPERAS COVE SYSTEM INTEGRITY OCTOBER 4256 080.73410 9,011 INSTALL 3,170 FEET OF 2 INCH POLY ALONG CHO STREET AND ABANDON 1015 FEET OF 4 INCH STEEL, 215 FEET OF 2 INCH STEEL, 525 FEET OF 2 INCH STEEL, 1005 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 4257 080.73411 691,387 INSTALL 950 FEET OF 4 INCH AND 3,700 FEET OF 2 INCH POLY ALONG THE STREETS OF RICHLAND AVE AND BEE STREET IN FARMERS BRANCH AND ABANDON 950 FEET OF 4 INCH AND 3,700 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY OCTOBER 4258 080.73413 18,898 INSTALL 594 FEET OF 4 INCH, 1,836 FEET OF 2 INCH POLY AND ABANDON 330 FEET OF 4 INCH STEEL, 394 FEET OF 3 INCH POLY, AND 145 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 4259 080.73430 223 RELOCATE FACILITIES. INSTALL 40 FEET OF 6 INCH POLY AND ABANDON 40 FEET OF 6 INCH POLY ALONG HICKIX ROAD. ALL CUSTOMERS ROWLETT RELOCATION OF FACILITIES SEPTEMBER 4260 080.73439 897 INSTALL 2210 FEET OF 2 INCH POLY ALONG THE STREET OF WILLIAMS CREEK DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH JUNE 4261 080.73442 21,345 INSTALL 1,072 FEET OF 4 INCH AND 1,617 FEET OF 2 INCH POLY ALONG STREETS OF GRAND PRAIRIE AND ABANDON 378 FEET OF 4 INCH, 1410 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 4262 080.73443 4,599 RELOCATE FACILITIES. INSTALL (2) POLY SERVICES ALONG COLLINS AND ABANDON 656 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES OCTOBER 4263 080.73450 24,059 INSTALL 1400 FEET OF 2 INCH POLY ALONG STREETS OF MEXIA AND ABANDON 1400 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY OCTOBER 4264 080.73451 21,265 INSTALL 650 FEET OF 4 INCH POLY ALONG EULESS BOULEVARD IN EULESS. COMMERCIAL OR INDUSTRIAL EULESS GROWTH OCTOBER 4265 080.73452 153,297 RELOCATE FACILITIES. INSTALL 1,380 FEET OF 2 INCH POLY ALONG WEST COMMERCE AND ABANDON 1,465 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY APRIL 4266 080.73453 28,683 INSTALL 1864 FEET OF 4 INCH AND 277 FEET OF 2 INCH POLY ALONG BARNETT STREET AND ABANDON 1830 FEET OF 3 INCH AND 180 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER 4267 080.73454 408,046 RELOCATE FACILITIES. INSTALL 1,933 FEET OF 4 INCH POLY ALONG NORTH STREET AND 538 FEET OF 2 INCH POLY ALONG ROBINSON AVENUE AND ABANDON 925 FEET OF 3 INCH POLY, 135 FEET OF 2 INCH POLY, 410 FEET OF 2 INCH STEEL AND 95 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE TEXAS RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY SEPTEMBER 4268 080.73455 587,809 INSTALL 2,692 FEET OF 2 INCH POLY ALONG FORD ST AND COLLEGE STREET AND 429 FEET OF 4 INCH POLY ALONG 5TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY DECEMBER 4269 080.73457 1,266,296 INSTALL 3,000 FEET OF 4 INCH, 200 FEET OF 2 INCH POLY ALONG CUSTER STREET IN RICHARDSON AND ABANDON 1,000 FEET OF 4 INCH STEEL AND 2,000 FEET OF 4 INCH, AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY DECEMBER 4270 080.73460 193,809 RELOCATE FACILITIES. INSTALL 1,550 FEET OF 2 INCH POLY ALONG PALESTINE STREET AND ABANDON 1,550 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER 4271 080.73462 154,677 RELOCATE FACILITIES. INSTALL 1,400 FEET OF 2 INCH POLY ALONG MCCLENDON STREET AND ABANDON 1,300 OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY DECEMBER 4272 080.73463 79 INSTALL 100 FEET OF 2 INCH POLY ALONG HARRELL DRIVE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL SOUTHLAKE GROWTH JUNE MTX Additions Page 128 of 178 347 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4273 080.73468 35,228 INSTALL 4400 FEET OF 6 INCH POLY ABANDON 4100 FEET OF 2 INCH POLY AND 300 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY OCTOBER 4274 080.73472 27,141 INSTALL 8 REGULATOR STATIONS, AND ABANDON 8 REGULATOR STATIONS AT THE FOLLOWING LOCATIONS, 1 IN EACH CARROLLTON, DALLAS, VAN ALSTYNE, POTTSBORO AND 2 IN DENISON, AND 2 IN GAINSVILLLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY MARCH 4275 080.73473 2,232 INSTALL FOUR TWO INCH MOONEY REGULATORS AND ONE 3 X 4 FLOW SAFE RELIEF VALVE, REMOVE & ABANDON FOUR FISHER 399A REGULATORS & ONE 3 INCH GROVE 83 RELIEF VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY OCTOBER 4276 080.73474 658 INSTALL 618 FEET OF 4 INCH POLY ALONG THE STREETS OF GATES OF PROSPER. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL PROSPER GROWTH MARCH 4277 080.73479 7,590 INSTALL 2345 FEET OF 4 INCH STEEL AND ABANDON 992 FEET OF 2 INCH STEEL AND 1802 FEET OF 3 INCH STEEL ALONG PINE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE. ALL CUSTOMERS BRUCEVILLE EDDY SYSTEM INTEGRITY OCTOBER 4278 080.73480 3,344 ABANDON 28 DISTRICT REGULATOR STATIONS ALONG THE STREETS OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4279 080.73481 22,239 PURCHASE A NEW IT MOBILE COMMAND CENTER FOR MID-TEX ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT JUNE 4280 080.73485 186 INSTALL 375 FEET OF 2 INCH POLY ALONG PARK VISTA BOULEVARD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH MARCH 4281 080.73490 (8,538) INSTALL 2 INCH POLY ALONG NORTH BEACH STREET. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH JUNE 4282 080.73493 151,220 INSTALL 25 FEET OF 2 INCH AND 25 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #08 ALONG PARKSIDE AND CROSBY AND ABANDON DISTRICT REGUALATOR STATION AND 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH WITH THE RAILROAD COMMISSION OF TEXAS RULE OF 8.209. ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY SEPTEMBER 4283 080.73496 1,152 INSTALL 2845 FEET OF 4 INCH POLY AND 3725 FEET OF 2 INCH POLY ALONG THE STREETS OF SENDERA RANCH EAST 23. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JUNE 4284 080.73497 536,934 RELOCATE FACILIITES.&NBSP; INSTALL 2,648 OF 4 INCH POLY ALONG THE ALLEY OF BELMONT AVENUE AND ABANDON 811 FEET OF 2 INCH, 739 FEET OF 4 INCH, AND 622 FEET OF 3 INCH, AND 76 FEET OF 8 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 4285 080.73499 80 INSTALL 778 FEET OF 4 INCH AND 180 FEET OF 2 INCH POLY ALONG ED SCHMIDT TO SERVE HANSONS CORNER DISTRICT. COMMERCIAL OR INDUSTRIAL HUTTO GROWTH MARCH 4286 080.73505 855 INSTALL 425 FEET OF 4 INCH POLY ALONG TABOR PARKWAY. COMMERCIAL OR INDUSTRIAL KAUFMAN GROWTH JUNE 4287 080.73506 133 RELOCATE FACILITIES. INSTALL 512 FEET OF 4 INCH POLY AND ABANDON 515 FEET OF 4 INCH POLY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PROSPER RELOCATION OF FACILITIES APRIL 4288 080.73508 15,918 RELOCATE FACILITIES. INSTALL 180 FEET OF 2 INCH POLY ALONG GREENFIELD ACRES AND ABANDON 160 FEET OF 2 INCH POLY TO ACCOMODATE CITY OF FORT WORTH STORM DRAIN PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES DECEMBER 4289 080.73509 4,302 INSTALL 200 FEET OF 4 INCH POLY ALONG THE STREETS OF TRADITION SENIOR LIVING FACILITY . DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH SEPTEMBER 4290 080.73514 867,568 INSTALL 2,274 FEET OF 8 INCH AND 184 FEET OF 4 INCH POLY ALONG ROCHELLE ROAD AND MACARTHUR BOULEVARD AND ABANDON 1,411 FEET OF 8 INCH, 233 FEET OF 4 INCH, 73 FEET OF 3 INCH STEEL AND 159 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER 4291 080.73517 1,422,472 INSTALL 2,655 FEET OF 4 INCH, 970 FEET OF 2 INCH POLY ALONG CANADA DRIVE AND ABANDON 1,884 FEET OF 6 INCH AND 729 FEET OF 2 INCH STEEL AND 660 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4292 080.73521 (9,754) INSTALL 4 INCH POLY SERVICE ALONG ANDERSON ROAD. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH JUNE 4293 080.73522 12,199 INSTALL 529 FEET OF 6 INCH POLY ALONG GRANDBURY ROAD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH SEPTEMBER 4294 080.73523 36,839 INSTALL 2100 FEET OF 8 INCH AND 1100 FEET OF 2 INCH POLY ALONG TRAIL LAKE DRIVE AND ABANDON 2100 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4295 080.73524 48,693 INSTALL 1700 FT OF 2 INCH POLY ALONG STREETS OF COTTAGE OF MAGNOLIA SUBDIVISION. RESIDENTIAL SHERMAN GROWTH JUNE 4296 080.73530 39,400 INSTALL 175 FEET OF 6 INCH POLY ALONG THE STREETS OF THE ANNA 455 SUBDIVISION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ANNA GROWTH DECEMBER 4297 080.73531 77,569 INSTALL 725 FEET OF 12 INCH POLY AND ABANDON 710 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4298 080.73537 210,733 INSTALL 4,420 FEET OF 2 INCH AND 2,175 FEET OF 4 INCH POLY ALONG THE STREETS OF STUART RIDGE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH OCTOBER 4299 080.73555 (13) INSTALL 1600 FEET OF 2 INCH AND 650 FEET OF 4 INCH POLY ALONG THE STREETS OF HEARTLAND 18. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH JANUARY 4300 080.73557 220,657 INSTALL 900 FEET OF 8 INCH POLY ALONG THE STREETS OF DALLAS AND ABANDON 900 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4301 080.73558 25,728 INSTALL 2,267 FEET OF 2 INCH POLY ALONG STREETS OF GRAND PRAIRIE AND ABANDON 339 FEET OF 4 INCH AND 1,938 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 4302 080.73560 5,343 INSTALL 3,346 FEET OF 6 INCH POLY ALONG CARTER EAST INDUSTRIAL PARK IN TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH SEPTEMBER 4303 080.73562 1,015 INSTALL 2510 FEET OF 2 INCH POLY ALONG THE STREETS OF BAR C RANCH PHASE 5. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH MARCH 4304 080.73574 6,050 INSTALL 310 FEET OF 6 INCH POLY ALONG CEDAR AND ABANDON 297 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 4305 080.73575 522,674 RELOCATE FACILITIES. INSTALL 1,848 FEET OF 4 INCH POLY ALONG PARK STREET AND ABANDON 1,067 FEET OF 2 INCH AND 925 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4306 080.73576 8,973 INSTALL 1415 FEET OF 2 INCH POLY MAPLE STREET AND PINE STREET AND ABANDON 3270 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLENN HEIGHTS SYSTEM INTEGRITY OCTOBER 4307 080.73579 792,340 RELOCATE FACILIITIES. INSTALL 1,345 FEET OF 2 INCH, 2,925 FEET OF 6 INCH, 21 FEET OF .75 INCH ALONG ALTA MESA BOULEVARD AND ABANDON 950 FEET OF 1.25 INCH, 107 FEET OF 2 INCH POLY AND 2,900 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JULY 4308 080.73581 1,079 INSTALL DISTRICT REGULATOR STATION 66, 40 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY IN SAN ANGELO AND ABANDON DISTRICT REGULATOR STATION 20, DISTRICT REGULATOR STATION 66, 60 FEET OF 2 INCH STEEL, 15 FEET OF 2 INCH POLY, 10 FEET OF 4 INCH STEEL AND 40 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 4309 080.73586 5,066 INSTALL 2205 FEET OF 2 INCH POLY ALONG ORANGE STREET AND ABANDON 185 FEET OF 2 INCH POLY, 395 FEET OF 3 INCH POLY, 1760 FEET OF 2 INCH STEEL AND DISTRTICT REGULATOR STATION 071 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 4310 080.73587 439,884 RELOCATE FACILITIES. INSTALL 1,691 FEET OF 4 INCH POLY ALONG PARK STREET AND ABANDON 764 FEET OF 3 INCH, 481 FEET OF 4 INCH, 245 FEET OF 2 INCH POLY AND 120 FEET OF 2 INCH STEEL,, 55 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 4311 080.73589 1,320 INSTALL 276 FEET OF 2 INCH POLY AND ABANDON 381 FEET OF 2 INCH STEEL ALONG COTTAGE GROVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SUNSET SYSTEM INTEGRITY OCTOBER MTX Additions Page 129 of 178 348 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4312 080.73591 872 INSTALL 1488 FEET OF 4 INCH, 1579 FEET OF 2 INCH POLY ALONG THE STREETS OF TAVOLO PARK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH JUNE 4313 080.73592 318,371 RELOCATE FACILITIES. INSTALL 1,296 FEET OF 4 INCH POLY ALONG GRAND AVE AND ABANDON 745 FEET OF 4 INCH STEEL, 568 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 4314 080.73593 69,467 INSTALL 642 FEET OF 4 INCH POLY AND 1926 FEET OF 2 INCH POLY ALONG STREETS OF GRAND PRAIRIE AND ABANDON 779 FEET OF 4 INCH STEEL AND 1273 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSIN OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 4315 080.73596 (43,324) RELOCATE FACILITIES. INSTALL 1500 FEET OF 6 INCH STEEL AND ABANDON 900 FEET OF 6 INCH STEEL ALONG NORTH OF VICTORY CIRCLE TO ACCOMMODATE A DEVELOPER PROJECT. ALL CUSTOMERS NORTHLAKE RELOCATION OF FACILITIES SEPTEMBER 4316 080.73601 (13,188) INSTALL 230 FEET OF 4 INCH POLY ALONG STREETS OF WALMART. ALL CUSTOMERS DALLAS SYSTEM IMPROVEMENT JULY 4317 080.73602 20,896 REPLACE 105 STEEL SERVICE LINES IN CORSICANA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 4318 080.73605 67,869 REPLACE 108 STEEL SERVICE LINES IN CORSICANA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 4319 080.73614 15,014 RELOCATE FACILITIES. INSTALL 1364 FEET OF 4 INCH POLY ALONG MCFARLAND STREET AND ABANDON 902 FEET OF 4 INCH POLY, 215 FEET OF 3 INCH STEEL TO ACCOMODATE THE CITY OF KERRVILLE STREET IMPROVMENT PROJECT. ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES OCTOBER 4320 080.73616 26,015 INSTALL 207 POLY SERVICE LINES AND ABANDON 207 STEEL SERVICE LINES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 4321 080.73618 33,004 INSTALL 1115 FEET OF 2 INCH POLY AND 870 FEET OF 4 INCH POLY ALONG STREETS OF HILLSBORO AND ABANDON 770 FEET OF 2 INCH STEEL, 715 FEET OF 4 INCH STEEL, 155 FEET OF 4 INCH POLY AND 362 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 4322 080.73620 18,273 REPLACE 103 STEEL SERVICE LINES IN BRYAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 4323 080.73625 27,392 INSTALL 3780 FEET OF 4 INCH AND 12,900 FEET OF 8 INCH POLY ALONG FM2757. ALL CUSTOMERS CRANDALL GROWTH OCTOBER 4324 080.73626 455,764 RELOCATE FACILITIES. INSTALL 2630 FEET OF 2 INCH POLY ALONG CLINTON AVENUE AND ABANDON 4315 FEET OF 2 INCH AND 125 FEET OF 1.25 INCH STEEL AND 380 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4325 080.73629 922 INSTALL 1075 FEET OF 4 INCH AND 2160 FEET OF 4 INCH POLY ALONG THE STREETS OF SENDERA RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JULY 4326 080.73634 1,879 INSTALL 204 FEET OF 2 INCH POLY ALONG SLOAN STREET. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WHITESBORO GROWTH MARCH 4327 080.73639 214 INSTALL 722 FEET OF 4 INCH POLY ALONG STREETS IN JOSHUA. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL JOSHUA GROWTH MARCH 4328 080.73641 3,115 RELOCATE FACILITIES. INSTALL 260 FEET OF 2 INCH POLY AND ABANDON 250 FEET OF 2 INCH POLY ALONG FOREST PARK BOULEVARD TO ACCOMODATE THE CITY OF FORT WORTH STREET IMPROVMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4329 080.73644 8,627 INSTALL 2020 FEET OF 6 INCH POLY ALONG MARTIN STREET AND ABANDON 2048 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILOAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4330 080.73645 4,709 INSTALL 2045 FEET OF 4 INCH AND 2960 FEET OF 2 INCH POLY ALONG THE STREETS OF NORTHGLEN SUBDIVISION. RESIDENTIAL HASLET GROWTH APRIL 4331 080.73651 711 REPLACE RELIEF VALVE ON DISTRICT REGULATOR STATION 24 ALONG SIBLEY AND HOLLIDAY STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 4332 080.73654 34,285 INSTALL 2200 FEET OF 4 INCH POLY AND 150 FEET OF 8 INCH STEEL CASING ALONG WEST ROUND GROVE ROAD. COMMERCIAL OR INDUSTRIAL LEWISVILLE GROWTH JULY 4333 080.73655 910,908 INSTALL 2,050 FEET OF 2 INCH AND 887 FEET OF 4 INCH POLY ALONG THE STREETS OF CITY OF WACO AND ABANDON 1,960 FEET OF 3 INCH AND 820 FEET OF 4 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 4334 080.73657 584,394 INSTALL 765 FEET 2 INCH AND 1,955 FEET OF 4 INCH POLY ALONG N. 46TH STREET AND ABANDON 1,010 FEET OF 2 INCH AND 2,295 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 4335 080.73662 112,365 INSTALL 2,510 FEET OF 2 INCH POLY ALONG THE STREETS OF PLANO GATEWAY TOWNHOMES. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PLANO GROWTH DECEMBER 4336 080.73663 149,310 INSTALL 300 FEET OF 6 INCH AND 500 FEET OF 4 INCH OF POLY ALONG THE STREETS OF PLANO GATEWAY TOWNHOMES. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PLANO GROWTH DECEMBER 4337 080.73664 13,220 INSTALL DISTRICT REGULATOR STATION 03, 04, 07 ALONG COMMERCE STREET, 345 FEET OF 4 INCH POLY, 225 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 03, 04, 07, 105 FEET OF 2 INCH STEEL, 40 FEET OF 3 INCH STEEL, 40 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HONEY GROVE SYSTEM INTEGRITY OCTOBER 4338 080.73665 9,285 INSTALL 1,866 FEET OF 4 INCH AND 1,681 FEET OF 2 INCH POLY ALONG THE STREETS OF MALLOW ROAD AND BLUEWOOD BEND. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JULY 4339 080.73666 29,192 INSTALL 1,122 FEET OF 6 INCH, 2,683 FEET OF 4 INCH AND 1,426 FEET OF 2 INCH POLY ALONG THE STREETS OF BRIDGEHAVEN SUBDIVISION. DEVELOPER INSTALLED FACILIITES. RESIDENTIAL GEORGETOWN GROWTH JULY 4340 080.73669 1,064 INSTALL 1396 FEET OF 8 INCH, 2507 FEET OF 4 INCH, AND 3070 FEET OF 2 INCH POLY ALONG THE STREETS OF EMORY CROSSING SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH MARCH 4341 080.73671 437,050 INSTALL 2,800 FEET OF 2 INCH POLY ALONG THE STREETS OF SQUIRE PLACE AND BEE STREET AND ABANDON 2,800 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY DECEMBER 4342 080.73672 200,174 RELOCATE FACILITIES. INSTALL 1,730 FEET OF 2 INCH POLY ALONG WEST MAIN AND ABANDON 1,460 FEET OF 4 INCH, 200 INCH OF 3 INCH STEEL AND, 746 INCH OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY JULY 4343 080.73673 5,757 RELOCATE FACILITIES. INSTALL 1500 FEET OF 4 INCH POLY ALONG 38TH STREET. ALL CUSTOMERS KILLEEN RELOCATION OF FACILITIES MARCH 4344 080.73678 316,227 RELOCATE FACILITIES. INSTALL 325 FEET OF 2 INCH, 1,600 FEET OF 6 INCH POLY ALONG ALTA MESA BLVD AND ABANDON 1,575 FEET OF 6 INCH, 300 FEET OF 1.25 INCH, AND 8 FEET OF .75 INCH OF STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE OF 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JULY 4345 080.73689 22,662 INSTALL 1570 FEET OF 4 INCH POLY ALONG FAIRLANE AVENUE AND ABANDON 918 FEET OF 2 INCH POLY, 396 FEET OF 4 INCH STEEL AND 237 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4346 080.73694 3,115 INSTALL DISTRICT REGULATOR STATION 029 ALONG MAIN STREET AND ABANDON DISTRICT REGULATOR STATION 029 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4347 080.73696 1 REPLACE MCKINNEY SIGN FOR THE MCKINNEY SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JANUARY 4348 080.73701 770,530 RELOCATE FACILITIES. INSTALL 2,500 FEET OF 2 INCH POLY ALONG BALLINGER AND ABANDON 2,470 FEET OF 2 INCH POLY TO ACCOMODATE THE CITY OF GARLAND WATER, DRAINAGE AND CONCRETE IMPROVEMENTS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 4349 080.73703 160,439 RELOCATE FACILITIES. INSTALL 1,700 FEET OF 2 INCH POLY ALONG EAST 4TH AND ABANDON 1,140 FEET OF 2 INCH POLY TO ACCOMODATE THE CITY OF JOSHUA IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JOSHUA SYSTEM INTEGRITY SEPTEMBER 4350 080.73706 15 INSTALL 100 FEET OF 4 INCH POLY ALONG SHADY GROVE ROAD. ALL CUSTOMERS GRAND PRAIRIE GROWTH JANUARY MTX Additions Page 130 of 178 349 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4351 080.73710 2,913 RELOCATE FACILITIES. INSTALL 50 FEET OF 2 POLY AND ABANDON 25 FEET OF 2 INCH POLY ALONG LENEL PLACE AND CLOVER LANE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 4352 080.73711 (12,872) INSTALL 250 FEET OF 2 INCH POLY ALONG WATERLOO LAKE DRIVE. RESIDENTIAL DENISON GROWTH MARCH 4353 080.73715 445 INSTALL 1300 FEET OF 4 INCH POLY ALONG STREETS OF DFW 161 PARK WAREHOUSE COMPLEX. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL IRVING GROWTH JUNE 4354 080.73716 18,280 INSTALL 1,400 FEET OF 6 INCH, AND 10 FEET OF 2 INCH POLY ALONG HARRY MCKILLIOP BOULEVARD IN MCKINNEY, COLLLIN COUNTY. ALL CUSTOMERS MCKINNEY GROWTH DECEMBER 4355 080.73718 5,777 INSTALL 1,760 FEET OF 2 INCH POLY ALONG HARRY MCKILLOP BOULEVARD AND COUCH DRIVE IN MCKINNEY, COLLIN COUNTY. COMMERCIAL OR INDUSTRIAL MCKINNEY GROWTH DECEMBER 4356 080.73720 16,628 INSTALL 1555 FEET OF 4 INCH POLY ALONG TRENTMAN STREET AND ABANDON 1452 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4357 080.73721 (14,865) INSTALL 725 FEET OF 4 INCH POLY ALONG STATE HIGHWAY 31 IN CORSICANA. COMMERCIAL OR INDUSTRIAL CORSICANA GROWTH JULY 4358 080.73728 84 INSTALL 220 FEET OF 6 INCH POLY ALONG NORTH GATE DRIVE. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS IRVING GROWTH MARCH 4359 080.73729 7,336 INSTALL 1320 FEET OF 2 INCH POLY ALONG 10TH STREET AND ABANDON 1200 FEET OF 2 INCH, 353 FEET OF 3 INCH AND 47 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA SYSTEM INTEGRITY OCTOBER 4360 080.73730 8,573 RELOCATE FACILITIES. INSTALL 500 FEET OF 4 INCH POLY AND 100 FEET OF 2 INCH POLY AND ABANDON 500 FEET OF 3 INCH STEEL AND 100 FEET OF 2 INCH STEEL ALONG PREVOST TO ACCOMODATE THE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4361 080.73732 6,067 INSTALL 150 FEET OF 4 INCH AND 450 FEET OF 2 INCH POLY ALONG SOUTH 14TH AND PEACH AND ABANDON 462 FEET OF 4 INCH STEEL AND 64 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 4362 080.73733 (22) INSTALL 75 FEET OF 2 INCH IP POLY ALONG FREEMAN AVE TO SERVE NEW RESIDENTIAL CUSTOMER. RESIDENTIAL BRYAN GROWTH JANUARY 4363 080.73735 26,177 INSTALL 585 FEET OF 4 INCH POLY SERVICE ALONG HUNTER LANE. COMMERCIAL OR INDUSTRIAL GRAND PRAIRIE GROWTH JUNE 4364 080.73736 (3) INSTALL 200 FEET OF 2 INCH POLY ALONG STREETS OF HEARTLAND PHASE 10A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH JANUARY 4365 080.73739 11,316 INSTALL 1450 FEET OF 4 INCH POLY ALONG STREETS OF WALMART. COMMERCIAL OR INDUSTRIAL MANSFIELD GROWTH OCTOBER 4366 080.73741 13,409 INSTALL 1,200 FEET OF 4 INCH POLY AND ABANDON 3 INCH STEEL ALONG MACARTHUR DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 4367 080.73745 1,005,176 INSTALL 3,600 FEET OF 2 INCH AND 256 FEET OF 4 INCH POLY ALONG CAMP DRIVE AND GRICE STRET IN WACO AND ABANDON 3,415 FEET OF 2 INCH AND 278 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 4368 080.73748 820,097 INSTALL 9,626 FEET OF 2 INCH AND 760 FEET OF 4 INCH POLY ALONG THE STREET OF VENETIAN AT WESTON SUBDIVISION IN MCKINNEY, COLLIN COUNTY. RESIDENTIAL MCKINNEY GROWTH DECEMBER 4369 080.73749 (26,764) INSTALL 50 FEET OF 6 INCH POLY ALONG MONTFORD ROAD. COMMERCIAL OR INDUSTRIAL DALLAS GROWTH JUNE 4370 080.73750 2,275 INSTALL 100 FEET OF 2 INCH POLY ALONG OBERMAN LANE. RESIDENTIAL SHADY SHORES GROWTH SEPTEMBER 4371 080.73751 439,842 INSTALL 3,800 FEET OF 4 INCH AND 10,000 FEET OF 2 INCH POLY ALONG THE STREETS OF POLO RIDGE SUBDIVISION IN CRANDALL, KAUFMAN COUNTY. DEVELOPER INSTALLED FACILITY. RESIDENTIAL CRANDALL GROWTH DECEMBER 4372 080.73753 996,097 INSTALL 700 FEET OF 2 INCH, 375 FEET OF 4 INCH, 3,250 FEET OF 6 INCH POLY ALONG SOUTH HULEN STREET AND ABANDON 25 FEET OF 2 INCH POLY, 750 FEET OF 2 INCH, 110 FEET OF 4 INCH AND 2,950 FEET OF 6 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 4373 080.73755 514,405 RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH, 2,525 FEET OF 4 INCH POLY ALONG WHISTLER DRIVE AND ABANDON 280 FEET OF 1.25 INCH AND 2,500 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8,209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 4374 080.73756 10,197 INSTALL 3,665 FEET OF 2 INCH POLY ALONG THE STREETS OF LOST WOODS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH SEPTEMBER 4375 080.73757 (162) INSTALL 80 FEET OF 2 INCH POLY ALONG CLAY STREET. RESIDENTIAL KERRVILLE GROWTH JANUARY 4376 080.73758 2,983 INSTALL 555 FEET OF 2 INCH POLY ALONG LAKELINE BOLUVARD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL LEANDER GROWTH JUNE 4377 080.73759 14,654 INSTALL 3,702 FEET OF 4 INCH AND 2,865 FEET OF 2 INCH POLY ALONG THE STREETS OF ROSENBUSCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JUNE 4378 080.73761 550,031 RELOCATE FACILITIES. INSTALL 2,475 FEET OF 6 INCH AND 20 FEET OF 4 INCH POLY ALONG KELLER HICKS ROAD AND ABANDON 2,200 FEET OF 4 INCH AND 150 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 4379 080.73763 (2) INSTALL 1,775 FEET OF 2 INCH POLY ALONG SHADY LANE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SOUTHLAKE GROWTH JANUARY 4380 080.73765 16,005 INSTALL 760 FEET OF 2 INCH POLY ALONG THE STREETS OF BELAIR AND ALEXANDRIA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WICHITA FALLS GROWTH JUNE 4381 080.73766 18,314 INSTALL 1,206 FEET OF 6 INCH, 3,453 FEET OF 4 INCH AND 3,589 FEET OF 2 INCH POLY ALONG THE STREETS OF LISSO SUBDIVISION IN PFLUGERVILLE, TRAVIS COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH DECEMBER 4382 080.73768 90,363 INSTALL 2,781 FEET OF 4 INCH, AND 5,676 FEET OF 2 INCH POLY ALONG THE STREETS OF MUSTANG CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH DECEMBER 4383 080.73769 18,709 INSTALL 865 FEET OF 4 INCH POLY ALONG THE STREETS OF UNT ART STUDIO. DEVLOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL DENTON GROWTH DECEMBER 4384 080.73770 76,099 INSTALL 730 FEET OF 4 INCH POLY ALONG THE STREETS OF THE COMMONS BLVD. ALL CUSTOMERS SACHSE GROWTH JUNE 4385 080.73771 499,108 INSTALL 616 FEET OF 4 INCH AND 3,276 FEET OF 2 INCH POLY ALONG THE STREETS OF PARKSDIE VILLAGE SUBDIVISION IN LEANDER, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER 4386 080.73773 42,715 INSTALL 1914 FEET OF 4 INCH POLY ALONG MARTIN STREET AND ABANDON 1360 FEET OF 6 INCH POLY, 742 FEET OF 4 INCH POLY AND 214 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4387 080.73774 5,999 INSTALL 2,340 FEET OF 4 INCH AND 2,314 FEET OF 2 INCH POLY ALONG THE STREETS OF BRIDGEHAVEN SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER 4388 080.73775 81,496 INSTALL 900 FEET OF 2 INCH POLY ALONG THE STREETS OF THE 5 MILE HOMES SUBDIVISION. RESIDENTIAL DALLAS GROWTH JULY 4389 080.73776 6,163 INSTALL 1900 FEET OF 2 INCH IP POLY ALONG COOKS LANE AND ABANDON 3922 OF 8 INCH TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4390 080.73777 33,046 INSTALL 1,000 FEET OF 6 INCH POLY ALONG EAST BARDIN ROAD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL ARLINGTON GROWTH DECEMBER 4391 080.73784 4,176 RELOCATE FACILITIES. INSTALL 1583 FEET OF 2 INCH POLY ALONG EAST WARREN STREET AND ABANDON 1234 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF HEWITT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEWITT RELOCATION OF FACILITIES OCTOBER 4392 080.73786 630 INSTALL 300 FEET OF 2 INCH POLY ALONG BEN MILAM DRIVE AND ABANDON 300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE SYSTEM INTEGRITY OCTOBER 4393 080.73787 1,722 INSTALL 875 FEET OF 2 INCH POLY ALONG WEST MUNSON AND ABANDON 470 OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER MTX Additions Page 131 of 178 350 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4394 080.73793 461,347 INSTALL 1,900 FEET OF 4 INCH AND 1,200 FEET OF 2 INCH POLY AND 200 FEET OF 8 INCH STEEL CASING. ABANDON 1,900 FEET OF 4 INCH AND 1,200 FEET OF 2 INCH STEEL ALONG RICHLAND AVENUE AND BEE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY DECEMBER 4395 080.73797 563 INSTALL 7400 FEET OF 2 INCH POLY AND 1050 FEET OF 4 INCH POLY ALONG THE STREETS OF LAKEPOINTE PHASE 2A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LAVON GROWTH DECEMBER 4396 080.73801 360 INSTALL 1850 FEET OF 2 INCH AND 1300 FEET OF 4 INCH POLY ALONG THE STREETS OF LAKEPOINTE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LAVON GROWTH OCTOBER 4397 080.73803 13,484 INSTALL DISTRICT REGULATOR STATION 03, 45 FEET OF 4 INCH POLY AND 45 FEET OF 2 INCH POLY ALONG STREETS OF CRANDALL AND ABANDON DISTRICT REGULATOR STATION 03, 7 FEET OF 3 INCH POLY, 15 FEET OF 2 INCH POLY AND 25 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CRANDALL SYSTEM INTEGRITY OCTOBER 4398 080.73806 13,505 REPLACE DRS14 AND INSTALL 25 FEET OF 2 INCH POLY AND 85 FEET OF 4 INCH ABANDON 25 FEET OF 2 INCH POLY AND 85 FEET OF 4 INCH POLY ALONG EAST LARKIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY OCTOBER 4399 080.73807 15,062 INSTALL DISTRICT REGULATOR STATION 02, 390 FEET OF 2 INCH POLY AND 115 FEET OF 4 INCH POLY ALONG SMITHE ROAD AND ABANDON 390 FEET OF 2 INCH STEEL AND 115 FEET OF 3 INCH STEEL AND DISTRICT REGULATOR STATION 02 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SCURRY SYSTEM INTEGRITY OCTOBER 4400 080.73809 10,753 INSTALL 40 FEET OF 4 INCH POLY, 60 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION 06 ALONG STREETS OF WYLIE AND ABANDON 55 FEET OF 4 INCH STEEL, 60 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 06 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WYLIE SYSTEM INTEGRITY OCTOBER 4401 080.73810 528,724 INSTALL 300 FEET OF 2 INCH, 2,900 FEET OF 4 INCH POLY ALONG WHEELOCK DRIVE IN FORT WORTH AND ABANDON 2,800 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4402 080.73814 3,487 RELOCATE FACILITIES. INSTALL 1130 FEET OF 2 INCH POLY AND ABANDON 1130 FEET OF 2 INCH STEEL ALONG BOOKER T STREET TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4403 080.73817 28,824 RELOCATE FACILITIES. INSTALL 600 FEET OF 4 INCH, 600 FEET OF 2 INCH AND 75 FEET OF 6 INCH POLY ALONG SAYLE STREET AND ABANDON 525 FEET OF 4 INCH, 75 FEET OF 3 INCH POLY AND 75 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF GREENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE RELOCATION OF FACILITIES DECEMBER 4404 080.73818 5,100,447 INSTALL 20,805 FEET OF 12 INCH POLY AND 257 FEET OF 16 STEEL ALONG THE STREETS OF COUNTY RD 175, FM 455, WEST ST, MAIN ST, AND FM 543 IN WESTON, COLLIN COUNTY. ALL CUSTOMERS CELINA GROWTH DECEMBER 4405 080.73822 88,950 INSTALL 300 FEET OF 6 INCH POLY ALONG CEDARDALE AT EAST ALTAMOORE IN DALLAS, DALLAS COUNTY. COMMERCIAL OR INDUSTRIAL DALLAS GROWTH DECEMBER 4406 080.73823 59,070 INSTALL 3,525 FEET OF 2 INCH AND 3,165 FEET OF 4 INCH POLY ALONG THE STREETS OF PRAIRIE OAKS IN OAK POINT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL OAK POINT GROWTH DECEMBER 4407 080.73826 718 INSTALL 2050 FEET OF 6 INCH POLY AND 2850 FEET OF 2 INCH POLY ALONG THE STREETS OF TRAILSTONE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CADDO MILLS GROWTH APRIL 4408 080.73828 14,856 INSTALL 1926 FEET OF 6 INCH AND 5748 FEET OF 2 INCH POLY ALONG THE STREETS OF HOMESTEAD SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER 4409 080.73829 (267,397) REPLACEMENT OF CABINETRY, COUNTERTOPS, DISHWASHER, AND ICE MACHINE AT THE BRYAN SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES MARCH 4410 080.73831 15,727 INSTALL 1162 FEET OF 6 INCH, 2635 FEET OF 4 INCH, AND 3390 FEET OF 2 INCH POLY ALONG THE STREETS OF COTTONWOOD CREEK SUBDIVISION. DEVLOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH JUNE 4411 080.73834 1,140 RELOCATE FACILITIES. INSTALL 40 FEET OF 4 INCH POLY ALONG WILLING AVENUE AND ABANDON 40 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4412 080.73835 2,714 INSTALL 1512 FEET OF 4 INCH POLY ALONG MOBERLY STREET AND ABANDON 1102 FEET OF 3 INCH STEEL AND 355 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4413 080.73837 57,236 INSTALL 2058 FEET OF 4 INCH POLY AND 273 FEET OF 2 INCH POLY ALONG STREETS OF GRAND PRAIRIE AND ABANDON 497 FEET OF 4 INCH STEEL AND 1276 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 4414 080.73838 59,909 INSTALL 325 FEET OF 2 INCH POLY, 1200 FEET OF 4 INCH POLY AND 900 FEET OF 6 INCH POLY ALONG HURSTVIEW DRIVE AND ABANDON 325 FEET OF 2 INCH STEEL AND 1985 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 4415 080.73839 525,940 INSTALL 2,568 FEET OF 4 INCH POLY AND ABANDON 132 FEET OF 3 INCH, 18 FEET OF 4 INCH POLY, 111 FEET OF 3 INCH AND 2,899 FEET OF 4 INCH STEEL ALONG REDBUD DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 4416 080.73840 493,633 RELOCATE FACILITIES. INSTALL 2,100 FEET OF 6 INCH POLY ALONG BUENA VISTA DRIVE AND ABANDON 2,100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY SEPTEMBER 4417 080.73841 543,910 INSTALL 2,684 FEET OF 3 INCH POLY AND ABANDON 2,684 FEET OF STEEL ALONG ANDERSON STREET IN ACCORDANCE WITH RAILROAD COMMISISON OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 4418 080.73842 245,087 INSTALL 2,710 FEET OF 2 INCH AND 400 FEET OF 6 INCH POLY AND ABANDON 1,870 FEET OF 2 INCH, 133 FEET OF 4 INCH POLY, 419 FEET OF 2 INCH AND 350 FEET OF 4 INCH STEEL ALONG HARMON ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSIOM OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 4419 080.73845 189,375 INSTALL 1,300 FEET OF 2 INCH POLY AND ABANDON 1,288 FEET OF 2 INCH POLY ALONG HARMON ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 4420 080.73846 447,127 INSTALL 2,140 FEET OF 4 INCH POLY AND ABANDON 130 FEET OF 2 INCH POLY AND 977 FEET OF 3 INCH AND 1,357 FEET OF 4 INCH STEEL ALONG TREADWELL DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 4421 080.73847 291,056 INSTALL 2,301 FEET OF 4 INCH POLY AND ABANDON 2,301 FEET OF 4 INCH STEEL ALONG SIMMONS STREET IN HURST IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 4422 080.73848 369,429 INSTALL 1,350 FEET OF 2 INCH POLY ALONG RIDGECREST DRIVE AND POST OAK DRIVE IN HURST AND ABANDON 213 FEET OF 2 INCH, 1,004 FEET OF 3 INCH AND 1,550 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 4423 080.73849 307,097 INSTALL 1,000 FEET OF 2 INCH AND 1,050 FEET OF 4 INCH POLY ALONG CROSSTIMBER DRIVE AND ABANDON 370 FEET OF 2 INCH AND 2,264 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY OCTOBER 4424 080.73850 9,261 INSTALL DISTRICT REGULATOR STATION DRS01 ALONG THE STREETS OF N 6TH STREET AND N 8TH STREET AND ABANDON DISTRICT REGULATOR STATION DRS01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BUCKHOLTS SYSTEM INTEGRITY OCTOBER 4425 080.73852 2,865 RELOCATE FACILITIES. INSTALL 680 FEET OF 6 INCH POLY ALONG REMSCHEL AVENUE AND ABANDON 670 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDACE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES OCTOBER 4426 080.73853 976 RELOCATE FACILITIES. INSTALL 145 FEET OF 2 INCH POLY ALONG C STREET AND ABANDON 3/4 INCH POLY SERVICE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES OCTOBER MTX Additions Page 132 of 178 351 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4427 080.73855 156,728 INSTALL 1,240 FEET OF 3 INCH POLY ALONG CHAPMAN DRIVE IN LANCASTER. DEVELOPER INSTALLED FACILIITES. ALL CUSTOMERS LANCASTER GROWTH OCTOBER 4428 080.73856 161,481 INSTALL 960 FEET OF 4 INCH AND 4,415 FEET OF 2 INCH POLY ALONG STREETS OF PLEASANT RUN ESTATES IN THE CITY OF LANCASTER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LANCASTER GROWTH JULY 4429 080.73859 343,010 RELOCATE FACILITIES. INSTALL 2,000 FEET OF 4 INCH POLY ALONG WRIGLEY WAY AND ABANDON 1,950 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 4430 080.73864 478,639 INSTALL ENCIRCLEMENTS ON 9 DENTS ALONG LINE P7 IN ROUND ROCK DUE TO ILI IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AUSTIN SYSTEM INTEGRITY OCTOBER 4431 080.73865 530,661 INSTALL 2,201 FEET OF 4 INCH POLY ALONG THE STREETS OF NW 16TH IN FORT WORTH AND ABAONDON 764 FEET OF 4 INCH AND 394 FEET OF 6 INCH STEEL AND 669 FEET OF 3 INCH AND 371 FEET OF 2 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 4432 080.73869 13,743 INSTALL 2431 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKES AT LEGACY SUBDIVSION. RESIDENTIAL PROSPER GROWTH JULY 4433 080.73871 1,985 INSTALL 700 FEET OF 4 INCH POLY ALONG WEST VISTA RIDGE MALL AND HIGHWAY 121. COMMERCIAL OR INDUSTRIAL LEWISVILLE GROWTH MARCH 4434 080.73872 99,244 INSTALL DISTRICT REGULATOR STATION #01 IN THE CITY OF ROSEBUD AND ABANDON DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSEBUD SYSTEM INTEGRITY SEPTEMBER 4435 080.73876 (7,360) RELOCATE FACILITIES. INSTALL 245 FEET OF 2 INCH POLY ALONG HARRY HINES NEAR HUNT STREET IN DALLAS AND ABANDON 245 FEET OF 2 INCH POLY. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 4436 080.73877 2,446 RELOCATE FACILITIES. INSTALL 13 POLY SERVICES AND ABANDON 13 POLY SERVICES TO ACCOMMODATE CITY OF CARROLLTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON RELOCATION OF FACILITIES OCTOBER 4437 080.73883 268,557 INSTALL 2,250 FEET OF 2 INCH POLY ALONG WILTON DRIVE IN FORT WORTH AND ABANDON 1,875 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 4438 080.73884 5,668 INSTALL 2,629 FEET OF 2 INCH POLY ALONG THE STREETS OF GREAT LAWN BEN AND LOTTI LANE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER 4439 080.73885 41,972 ABANDON 760 FEET OF 1.25 INCH, 130 FEET OF 2 INCH AND 110 FEET OF 2 INCH POLY WITH 980 FEET OF 2 INCH POLY ALONG IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4440 080.73886 41,134 INSTALL 35 FEET OF 4 INCH POLY SERVICE ALONG WENDLAND ROAD. COMMERCIAL OR INDUSTRIAL TEMPLE GROWTH SEPTEMBER 4441 080.73890 3,652 INSTALL 1517 FEET OF 4 INCH POLY AND 730 FEET OF 2 INCH POLY ALONG TRENTMAN STREET AND ABANDON 965 FEET OF 4 INCH STEEL, 610 FEET OF 2 INCH STEEL, 522 FEET OF 4 INCH POLY AND 84 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4442 080.73892 408,686 INSTALL 2,750 FEET OF 2 INCH POLY AND ABANDON 2,725 FEET OF 2 INCH STEEL ALONG THE STREETS OF WHITMAN AVE IN FORT WORTH IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 4443 080.73893 5,761 RELOCATE FACILITIES. INSTALL 1100 FEET OF 2 INCH POLY ALONG PAUL COURT AND ABANDON 500 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF RICHARDSON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES OCTOBER 4444 080.73895 690,507 RELOCATE FACILITIES. INSTALL 1,885 FEET OF 2 INCH, 1,180 FEET OF 4 INCH OF POLY ALONG GOULD ST AND ABANDON 601 FEET OF 1.25 INCH POLY AND, 351 FEET OF 2 INCH, 278 FEET OF 3 INCH STEEL, 1202 FEET OF 4 INCH POLY, 872 FEET OF 4 INCH AND 428 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 4445 080.73896 145,624 RELOCATE FACILIITIES. INSTALL 1,400 FEET OF 2 INCH POLY ALONG WEST BOWIE AND ABANDON 1,540 ON 2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY DECEMBER 4446 080.73897 3,901 INSTALL 500 FEET OF 4 INCH POLY ALONG LOOP 254 AND ABANDON 500 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER SYSTEM INTEGRITY OCTOBER 4447 080.73900 50,527 INSTALL 350 FEET OF 4 INCH, 70 FEET OF 4 INCH SERVICE AND METER INSTALLATION. COMMERCIAL OR INDUSTRIAL ABILENE GROWTH SEPTEMBER 4448 080.73903 523,110 INSTALL 3,425 FEET OF 2 INCH POLY ALONG WINIFRED DRIVE IN FORT WORTH AND ABANDON 3,325 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 4449 080.73908 28,489 INSTALL 1586 FEET OF 4 INCH AND 715 FEET OF 2 INCH POLY ALONG STREETS OF GRAND PRAIRIE AND ABANDON 1529 FEET OF 4 INCH AND 973 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 4450 080.73914 16,944 INSTALL DISTRICT REGULATOR STATION, 25 FEET OF 2 INCH POLY AND 25 FEET OF 4 INCH POLY ALONG STREETS OF KEMP AND ABANDON DISTRICT REGULATOR STATION 06, 25 FEET OF 3 INCH STEEL AND 25 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEMP SYSTEM INTEGRITY DECEMBER 4451 080.73915 3 INSTALL 265 FEET OF 2 INCH POLY ALONG LYNN WAY. RESIDENTIAL WAXAHACHIE GROWTH JANUARY 4452 080.73916 1,616 INSTALL 440 FEET OF 2 INCH POLY ALONG JUDY STREET AND ABANDON 440 FEET OF 2 INCH BARE STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITEHOUSE SYSTEM INTEGRITY OCTOBER 4453 080.73929 93,805 INSTALL 2,800 FEET OF 6 INCH POLY, 120 FEET OF 8 INCH STEEL ALONG HIGHWAY 84. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MC GREGO GROWTH DECEMBER 4454 080.73934 633,776 INSTALL 3,300 FEET OF 2 INCH, 2,500 FEET OF 4 INCH AND 1,400 FEET OF 6 INCH POLY ALONG THE STREETS OF BRIDGEWATER SUBDIVISION IN MIDLOTHIAN, ELLIS COUNTY. RESIDENTIAL MIDLOTHIAN GROWTH DECEMBER 4455 080.73938 3,088 RELOCATE FACILITIES. INSTALL 762 FEET OF 2 INCH POLY ALONG FM 932 AND ABANDON 355 FEET OF 2 INCH STEEL AND 390 FEET OF 2 INCH POLY TO ACCOMODATE TXDOT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HAMILTON RELOCATION OF FACILITIES OCTOBER 4456 080.73941 585,159 RELOCATE FACILITIES. INSTALL 3,200 FEET OF 2 INCH POLY ALONG MAIN AND ABANDON 442 FEET OF 2 INCH POLY, 750 FEET OF 2 INCH STEEL, 653 FEET OF 3 INCH STEEL, 263 FEET OF 4 INCH POLY AND 1092 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY SEPTEMBER 4457 080.73942 432 RELOCATE FACILITIES. INSTALL 25 FEET OF 2 INCH ALONG DUNN STREET AND ABANDON 10 FEET OF 2 INCH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE RELOCATION OF FACILITIES OCTOBER 4458 080.73948 1,654 ABANDON 490 FEET OF 3 INCH STEEL ALONG STREETS OF KEMP IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEMP SYSTEM INTEGRITY OCTOBER 4459 080.73950 132,106 INSTALL 400 FEET OF 4 INCH STEEL AND 20 FEET OF 16 INCH STEEL ALONG LINE CA6-1 AND ABANDON 400 FEET OF 4 INCH STEEL AND 20 FEET OF 16 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 4460 080.73952 11,788 INSTALL 1845 FEET OF 2 INCH POLY AND 668 FEET OF 4 INCH POLY ALONG BROOKLINE AVENUE AND ABANDON 1703 FEET OF 3 INCH STEEL, 421 FEET OF 2 INCH STEEL, 180 FEET OF 2 INCH POLY AND 22 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4461 080.73953 1,320 INSTALL 309 FEET OF 4 INCH AND 1799 FEET OF 2 INCH POLY ALONG THE STREETS OF CARLSON PLACE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH MARCH 4462 080.73954 862 INSTALL 2240 FEET OF 4 INCH AND 1032 FEET OF 2 INCH POLY ALONG THE STREETS OF CARLSON PLACE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH MARCH 4463 080.73955 (35,861) INSTALL 2930 FEET OF 4 INCH POLY AND 4655 FEET OF 2 INCH POLY ALONG THE STREETS OF CIBOLO HILLS SUBDIVSION. RESIDENTIAL FORT WORTH GROWTH JULY 4464 080.73957 48 INSTALL 300 FEET OF 2 INCH POLY TO SERVE 3 RESIDENTIAL CUSTOMERS ON SKINNEY DRIVE. RESIDENTIAL SWEETWATER GROWTH MARCH MTX Additions Page 133 of 178 352 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4465 080.73959 62,211 INSTALL 3350 FEET OF 2 INCH POLY ALONG STREETS OF DETROIT AND ABANDON 1715 FEET OF 3 INCH STEEL, 460 FEET OF 2 INCH STEEL, 355 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DETROIT SYSTEM INTEGRITY DECEMBER 4466 080.73965 601,686 INSTALL 1,083 FEET OF 4 INCH AND 1,544 FEET OF 2 INCH POLY ALONG THE STREETS OF GRAND PRAIRIE AND ABANDON 1,443 FEET OF 4 INCH AND 573 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY JULY 4467 080.73967 390,702 INSTALL 6,210 FEET OF 2 INCH AND 5,250 FEET OF 4 INCH POLY ALONG THE STREETS OF SANDBROCK RANCH SUBDIVISION IN THE CITY OF AUBREY. RESIDENTIAL AUBREY GROWTH DECEMBER 4468 080.73969 (38) INSTALL 1,097 FEET OF 4 INCH POLY ALONG EVERMAN PARKWAY BUSINESS PARK. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH MARCH 4469 080.73971 169 INSTALL 1375 FEET OF 4 INCH POLY ALONG DOWNING DRIVE INDUSTRIAL PARK. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH MARCH 4470 080.73972 377,386 RELOCATE FACILITIES. INSTALL 2,617 FEET OF 4 INCH POLY ALONG E. FAIRFAX AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 4471 080.73973 71,309 INSTALL 725 FEET OF 4 INCH POLY ALONG UPTOWN BOULEVARD. COMMERCIAL OR INDUSTRIAL CEDAR HILL GROWTH DECEMBER 4472 080.73977 23,945 INSTALL 1,975 FEET OF 2 INCH POLY ALONG THE STREETS OF GREENBRIER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH JUNE 4473 080.73978 76 REPLACE RELIEF VALVE ON DRS92 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER 4474 080.73979 28,791 RELOCATE FACILITIES. INSTALL 40 FEET OF 4 INCH POLY ALONG COOPER LANE AND ABANDON 40 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF JOSHUA IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JOSHUA SYSTEM INTEGRITY SEPTEMBER 4475 080.73983 542,040 INSTALL 1,200 FEET OF 4 INCH AND 2,450 FEET OF 2 INCH POLY ALONG HAVENHURST STREET AND GOODLAND STREET IN FARMER BRANCH AND ABANDON 1,200 FEET OF 4 INCH AND 2,450 FEET 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY DECEMBER 4476 080.73984 159,725 INSTALL 4600 FEET OF 2 INCH AND 275 FEET OF 4 INCH POLY ALONG HIGHBRIDGE BOULEVARD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH SEPTEMBER 4477 080.73988 543,449 INSTALL 3,300 FEET OF 2 INCH POLY ALONG RICHLAND AVENUE AND DENNIS LANE IN FARMERS BRANCH AND ABANDON 3,300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY OCTOBER 4478 080.73991 19,675 INSTALL 807 FEET OF 8 INCH, 1,554 FEET OF 4 INCH AND 2,621 FEET OF 2 INCH POLY ALONG THE STREETS OF WOLF RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER 4479 080.73994 431,511 RELOCATE FACILITIES. INSTALL 1,275 FEET OF 4 INCH, AND 1,367 FEET OF 2 INCH POLY ALONG GRAND PRAIRIE NEIGHBORHOOD AND ABANDON 1,191 FEET OF 4 INCH STEEL, 1,025 FEET OF 2 INCH POLY IN ACCORDDANCE WITH THE RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY JULY 4480 080.73997 14,170 INSTALL 250 FEET OF 8 INCH POLY AND ABANDON 250 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4481 080.74000 213,961 RELOCATE FACILIITIES. INSTALL 2,362 FEET OF 4 INCH POLY ALONG ROCKWALL STREET AND ABANDON DISTRICT REGULATOR STATION #05 AND 576 FEET OF 2 INCH STEEL, 7 FEET OF 3 INCH STEEL, 898 FEET OF 4 INCH STEEL, 10 FEET OF 2 INCH POLY, 637 FEET OF 3 INCH POLY, 63 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSON OF TEXAS RULE 8,209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY JUNE 4482 080.74002 16,368 INSTALL 830 FEET OF 4 INCH POLY AND 840 FEET OF 2 INCH POLY ALONG STREETS OF TERRELL AND ABANDON 908 FEET OF 2 INCH STEEL, 778 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION 15 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY OCTOBER 4483 080.74003 950,565 INSTALL 2,200 OF 2 INCH POLY ALONG NORTH COLLEGE STREET AND ABANDON 2,000 FEET OF 2 INCH, 3 INCH, AND 4 INCH STEEL AND 6 INCH STEEL AND WAXAHACHIE DISTRICT REGULATOR STATION #15 IN ACCORDANCE WITH&NBSP; RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY DECEMBER 4484 080.74004 52 INSTALL 160 FEET OF 4 INCH POLY ALONG INDUSTRIAL BOULEVARD. COMMERCIAL OR INDUSTRIAL EULESS GROWTH MARCH 4485 080.74005 716 INSTALL 400 FEET OF 2 INCH POLY ALONG BENNETT STREET AND ABANDON DISTRICT REGULATOR STATION 7 AND 400 FEET OF 3 INCH STEEL AND 30 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DETROIT SYSTEM INTEGRITY OCTOBER 4486 080.74007 (12) INSTALL 600 FEET OF 2 INCH POLY ALONG STREETS OF MIDPARK OFFICE PARK. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL MIDLOTHIAN GROWTH MARCH 4487 080.74008 13,798 INSTALL 3,490 FEET OF 8 INCH, 481 FEET OF 4 INCH AND 835 FEET OF 2 INCH POLY ALONG THE STREETS OF BUTLER FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER 4488 080.74009 468,978 INSTALL 75 FEET OF 6 INCH, 2,450 FEET OF 4 INCH, 300 FEET OF 2 INCH POLY ALONG THE STREETS OF KINGWOOD DRIVE AND ABANDON 55 FEET OF 6 INCH, 2,325 FEET OF 4 INCH STEEL, AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 4489 080.74011 845,107 INSTALL 2,365 FEET OF 2 INCH, 1,646 FEET OF 4 INCH POLY ALONG THE STREETS OF HUBBY AND WATT AVENUE AND ABANDON 800 FEET OF 4 INCH STEEL AND 1,155 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISISON OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 4490 080.74015 9,652 INSTALL 1,546 FEET OF 4 INCH AND 4,391 FEET OF 2 INCH POLY ALONG THE STREETS OF BUTLER FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER 4491 080.74017 643,940 INSTALL 940 FEET OF 4 INCH POLY AND 120 FEET OF 6 INCH STEEL ALONG SAN SABA FROM 3RD TO AVE A AND ABANDON 940 FEET OF 4 INCH STEEL N WORTHAM IN FREESTONE COUNTY. ALL CUSTOMERS WORTHAM SYSTEM INTEGRITY DECEMBER 4492 080.74021 1,214 RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF WACO STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 4493 080.74022 (97,755) RELOCATE FACILITIES. INSTALL 370 FEET OF 4 INCH, 340 FEET OF 4 INCH POLY ALONG GARZA STREET AND ABANDON 320 FEET OF 3 INCH STEEL, 238 FEET OF 3 INCH STEEL IN ACCORDANCE WTIH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TUSCOLA RELOCATION OF FACILITIES JULY 4494 080.74027 17,720 INSTALL 1270 FEET OF 2 INCH POLY ALONG HIAWATCH BOULEVARD AND ABANDON 1212 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 4495 080.74028 216,549 INSTALL 850 FEET OF 2 INCH POLY AND ABANDON 398 FEET OF 1.25 INCH STEEL AND 130 FEET OF 2 INCH POLY ALONG PAWHUSKA DR IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 4496 080.74031 142,633 INSTALL 875 FEET OF 2 INCH POLY AND ABANDON 800 FEET OF 2 INCH STEEL ALONG HIAWATHA BLVD IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 4497 080.74032 129,242 INSTALL 950 FEET OF 2 INCH POLY AND ABANDON 565 FEET OF 2 INCH STEEL AND 480 FEET OF 2 INCH POLY ALONG INDIAN HEIGHTS BLVD IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 4498 080.74038 450,801 INSTALL DISTRICT REGULATOR STATION #12, #23, #24 AND ABANDON DISTRICT REGULATOR STATION #12, #23, #24 ALONG THE STREETS OF THE CITY OF TERRELL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY DECEMBER 4499 080.74039 140,019 INSTALL 785 FEET OF 2 INCH, 160 FEET OF 6 INCH POLY ALONG ARTHUR AND AVE K IN WICHITA FALLS AND ABANDON 116 FEET OF 6 INCH, 75 FEET OF 4 INCH POLY, 311 FEET OF 4 INCH, 403 FEET OF 2 INCH AND 386 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER MTX Additions Page 134 of 178 353 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4500 080.74040 146,473 INSTALL 875 FEET OF 2 INCH POLY ALONG GARFIELD AND AVENUE J IN WICHITA FALLS AND ABANDON 467 FEET OF 2 INCH STEEL AND 1,021 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 4501 080.74041 264,989 INSTALL 1,600 FEET OF 2 INCH POLY ALONG KESSLER AVENUE AND HAYES STREET AND ABANDON 250 FEET OF 2 INCH, 1,035 FEET OF 4 INCH STEEL AND 458 FEET OF 2 INCH AND 430 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 4502 080.74042 6,666 INSTALL 335 FEET OF 2 INCH POLY ALONG THE STREETS OF PECAN RIDGE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GRAPEVINE GROWTH DECEMBER 4503 080.74047 (16,332) INSTALL DISTRICT REGULATOR STATION 35, 25 FEET OF 2 INCH POLY AND 25 FEET OF 4 INCH POLY IN GREENVILLE AND ABANDON DISTRICT REGULATOR STATION 35, 90 FEET OF 4 INCH AND 90 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY OCTOBER 4504 080.74048 655,313 RELOCATE FACILITIES. INSTALL 305 FEET OF 2 INCH, 2,345 FEET OF 4 INCH POLY AND ABANDON 2,185 FEET OF 4 INCH STEEL, 100 FEET OF 3 INCH POLY AND 305 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JUNE 4505 080.74049 222,342 INSTALL 3,350 FEET OF 2 INCH AND 1,640 FEET OF 4 INCH POLY ALONG THE STREETS OF LENNON CREEK IN DENTON. RESIDENTIAL HICKORY CREEK GROWTH OCTOBER 4506 080.74050 162,742 INSTALL 180 FEET OF 6 INCH, 4,040 FEET OF 4 INCH AND 780 FEET OF 2 INCH POLY ALONG THE STREETS OF THE HARVEST SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ABILENE GROWTH DECEMBER 4507 080.74054 460,416 ABANDON 1,800 FEET OF 6 INCH STEEL TO ACCOMODATE OPTIMAIN PIPE REPLACEMENT ALONG BYRON AND CORNELL AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY DECEMBER 4508 080.74060 24,230 INSTALL 2165 FEET OF 8 INCH STEEL ALONG STREETS OF SAN ANGELO AND ABANDON 2389 FEET OF FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 4509 080.74063 170,289 INSTALL 4,400 FEET OF 2 INCH AND 2000 FEET OF 4 INCH POLY ALONG BRIAR HUNT DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH SEPTEMBER 4510 080.74073 2,384 INSTALL 5470 FEET OF 2 INCH ALONG THE STREETS OF STONEY CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SUNNYVALE GROWTH APRIL 4511 080.74074 144,737 INSTALL 1950 FEET OF 4 INCH AND 2100 OF 2 INCH POLY ALONG THE STREETS OF BRIDGEWATER SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GARLAND GROWTH JULY 4512 080.74076 770 INSTALL 5160 FEET OF 2 INCH POLY ALONG STREETS OF STONEY CREEK PHASE 4C. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SUNNYVALE GROWTH JUNE 4513 080.74078 4,193 ABANDON 271 FEET OF 3 INCH STEEL AND 222 FEET OF 3 INCH POLY ALONG NABERS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER 4514 080.74079 6,503 INSTALL 1693 FEET OF 2 INCH POLY AND 2005 FEET OF 4 INCH POLY ALONG EAST BURLESON STREET AND ABANDON 715 FEET OF 2 INCH STEEL, 505 FEET OF 3 INCH STEEL, 205 FEET OF 4 INCH STEEL, 425 FEET OF 4 INCH POLY, 100 FEET OF 3 INCH POLY AND 650 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY OCTOBER 4515 080.74086 385,668 INSTALL 550 FEET OF 8 INCH AND 200 FEET OF 4 INCH POLY ALONG THE STREETS OF MIDWAY AND SPRING VALLEY AND ABANDON 550 FEET OF 8 INCH STEEL AND 200 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ADDISON SYSTEM INTEGRITY SEPTEMBER 4516 080.74087 440,168 INSTALL 685 FEET OF 2 INCH, 775 FEET OF 4 INCH POLY ALONG NORTHWEST 15TH STREET AND ABANDON 898 FEET OF 3 INCH, 539 FEET OF 4 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION OF RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 4517 080.74089 1,097 INSTALL 40 FEET OF 4 INCH STEEL ALONG COUNTY ROAD 195 AND REMOVE 40 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANSON SYSTEM INTEGRITY OCTOBER 4518 080.74096 159 INSTALL 100 FEET OF 2 INCH POLY ALONG PECAN STREET. COMMERCIAL OR INDUSTRIAL BRYAN GROWTH JUNE 4519 080.74098 315,392 RELOCATE FACILITIES. INSTALL 1,250 FEET OF 2 INCH POLY ALONG CHURCH STREET AND ABANDON 570 FEET OF 2 INCH POLY, 400 FEET OF 2 INCH AND 860 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 4520 080.74100 (40) INSTALL 1400 FEET OF 2 INCH POLY ALONG BRYANT BOULEVARD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL SAN ANGELO GROWTH MARCH 4521 080.74101 890 INSTALL 542 FEET OF 4 INCH POLY ALONG JEFFERSON STREET AND ABANDON 320 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER 4522 080.74103 6,628 INSTALL 637 FEET OF 2 INCH POLY ALONG THE STREETS OF THE TRINITY FALLS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH MARCH 4523 080.74108 80 INSTALL 250 FEET OF 2 INCH POLY TO SERVE ONE NEW RESIDENTIAL CUSTERAT 138 IVY LANE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HEWITT GROWTH APRIL 4524 080.74111 204,558 INSTALL 7725 FEET OF 2 INCH AND 1516 FEET OF 4 INCH POLY ALONG THE STREETS OF THE HONEY CREEK SUBDIVISION. RESIDENTIAL MCKINNEY GROWTH JUNE 4525 080.74114 640,579 INSTALL 4,238 FEET OF 4 INCH POLY ALONG HOLFORD ROAD AND ABANDON 4,149 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 4526 080.74119 1,098,361 INSTALL 2,157 FEET OF 2 INCH AND 1,721 FEET OF 4 INCH POLY ALONG FORT AVENUE AND HUBBY AVENUE AND ABANDON 1,090 FEET OF 4 INCH, 317 FEET OF 3 INCH STEEL AND 1,389 FEET OF 4 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 4527 080.74121 1,482,488 INSTALL 3,350 FEET OF 2 INCH POLY ALONG PEMBROKE DRIVE IN FORT WORTH AND ABANDON 420 FEET OF 6 INCH AND 1,550 FEET OF 6 INCH, 3,300 FEET OF 4 INCH AND 79 FEET STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 4528 080.74122 43,005 INSTALL 1028 FEET OF 4 INCH POLY ALONG STREETS OF FORT WORTH AND ABANDON 855 FEET OF 4 INCH STEEL, 158 FEET OF 3 INCH STEEL, 71 FEET OF 6 INCH STEEL AND 46 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4529 080.74123 17,277 REPLACE 114 STEEL SERVICES WITH POLY SERVICES IN BRYAN IN ACCORDANCE WITH RAILROAD COMMISION RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 4530 080.74127 172,971 RELOCATE FACILITIES. INSTALL 310 FEET OF 4 INCH POLY ALONG FOREST LN AND ABANDON 270 FEET OF 4 INCH POLY TO ACCOMODATE PLC/TXDOT. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES JULY 4531 080.74128 109,911 INSTALL 1,775 FEET OF 6 INCH POLY ALONG NORTHERN CROSS BOULEVARD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL HALTOM CITY GROWTH SEPTEMBER 4532 080.74130 1,790 INSTALL 330 FEET OF 2 INCH POLY AND ABANDON 330 FEET OF 2 INCH STEEL ALONG SOUTH OAK IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARCHER CITY SYSTEM INTEGRITY OCTOBER 4533 080.74136 3,376 RELOCATE FACILITIES. INSTALL 160 FEET OF 4 INCH POLY AND ABANDON 140 FEET OF 4 INCH STEEL ALONG LIVINGSTON DRIVE TO ACCOMMODATE CITY OF HURST STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST RELOCATION OF FACILITIES OCTOBER 4534 080.74137 818,169 INSTALL 700 FEET OF 6 INCH, 1,200 FEET OF 4 INCH AND 650 FEET OF 2 INCH POLY ALONG JOHNS WAY IN FORT WORTH AND ABANDON 700 FEET OF 6 INCH, 1,200 FEET OF 4 INCH AND 400 FEET OF 2 INCH STEEL AND 250 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4535 080.74140 134,349 RELOCATE FACILITIES. INSTALL 880 FEET OF 2 INCH POLY AND ABANDON 880 FEET OF 2 INCH STEEL ALONG CROWN ROAD TO ACCOMODATE CITY OF FORT WORTH PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4536 080.74144 443,826 INSTALL 1,260 FEET OF 8 INCH, 2,785 FEET OF 6 INCH, 1,190 FEET OF 4 INCH, AND 5,020 FEET OF 2 INCH POLY ALONG THE STREETS OF BAR C RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER 4537 080.74147 65,417 INSTALL 1100 FEET OF 6 INCH, 900 FEET OF 4 INCH AND 6175 FEET OF 2 INCH POLY ALONG THE STREETS OF EDGEWATER PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FATE GROWTH DECEMBER MTX Additions Page 135 of 178 354 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4538 080.74149 159,954 INSTALL 5100 FEET OF 2 INCH AND 330 FEET OF 4 INCH POLY ALONG THE STREETS OF WOODCREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FATE GROWTH DECEMBER 4539 080.74150 105,500 INSTALL 3,050 FEET OF 2 INCH POLY ALONG THE STREETS OF WOODCREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FATE GROWTH JUNE 4540 080.74155 (36) INSTALL 100 FEET OF 2 INCH POLY ALONG TIPPERARY DRIVE. RESIDENTIAL GRAPEVINE GROWTH MARCH 4541 080.74158 12,507 INSTALL 136 FEET OF 4 INCH POLY ALONG THE STREET OF SUMMER CREEK BOULEVARD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH SEPTEMBER 4542 080.74159 1,192,529 INSTALL 1,000 FEET OF 8 INCH POLY ALONG FISHER STREET, 3,255 FEET OF 4 INCH POLY AND 200 FEET OF 2 INCH POLY ALONG LIND AND SPENCE STREETS AND ABANDON 190 FEET OF 1.25 INCH, 25 FEET OF 2 INCH POLY AND 735 FEET OF 2 INCH, 685 FEET OF 4 INCH STEEL, 1,050 FEET OF 4 INCH POLY, AND 650 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY DECEMBER 4543 080.74160 82,714 INSTALL 700 FEET OF 4 INCH POLY ALONG HIGHWAY 6 IN BRYAN. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL BRYAN GROWTH DECEMBER 4544 080.74161 638 INSTALL 100 FEET OF 4 INCH POLY ALONG THE STREETS OF ABILENE. COMMERCIAL OR INDUSTRIAL ABILENE GROWTH APRIL 4545 080.74162 2,838 INSTALL 2,296 FEET OF 4 INCH AND 2,734 FEET OF 2 INCH POLY ALONG THE STREETS OF BOOT RANCH PHASE 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FREDERICKSBURG GROWTH JUNE 4546 080.74163 535 INSTALL 400 FEET OF 2 INCH POLY ALONG SOUTH JUPITER DRIVE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL GARLAND GROWTH JUNE 4547 080.74164 1,431 INSTALL 120 FEET OF 6 INCH POLY AND ABANDON 40 FEET OF 6 INCH POLY ALONG OLIVER DUE TO CITY OF GREENVILLE STORM SEWER IMPROVEMENTS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY OCTOBER 4548 080.74165 4,016 INSTALL 1200 FEET OF 4 INCH POLY ALONG MIDTOWN PARK. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL BRYAN GROWTH SEPTEMBER 4549 080.74169 96,409 INSTALL 1,400 FEET OF 6 INCH POLY ALONG THE STREETS OF LAKE RIDGE COMMONS SUBDIVISION IN MANSFIELD. ALL CUSTOMERS MANSFIELD GROWTH DECEMBER 4550 080.74170 1,837 INSTALL 1480 FEET OF 2 INCH POLY ALONG COUNTY ROAD 245. ALL CUSTOMERS GEORGETOWN GROWTH JUNE 4551 080.74171 154,975 INSTALL 150 FEET OF 4 INCH AND 3,800 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKE RIDGE COMMONS SUBDIVISION IN MANSFIELD. RESIDENTIAL MANSFIELD GROWTH DECEMBER 4552 080.74173 18,707 INSTALL 998 FEET OF 4 INCH ALONG THE STREETS OF NORTHLINE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JUNE 4553 080.74174 381,597 INSTALL 3,575 FEET OF 2 INCH POLY ALONG FIESTA CIRCLE AND ABANDON 3,550 FEET OF 2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JULY 4554 080.74176 13,278 INSTALL 1,571 FEET OF 4 INCH AND 3,362 FEET OF 2 INCH POLY ALONG THE STREETS OF BRYSON SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER 4555 080.74184 299,454 RELOCATE FACILITIES. INSTALL 2,300 FEET OF 2 INCH POLY ALONG S. DENTON STREET AND ABANDON 2,300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER 4556 080.74186 7,461 INSTALL 2,180 FEET OF 2 INCH AND 525 FEET OF 4 INCH POLY ALONG THE STREETS OF TWIN OAKS SUBDIVISION IN FAIRVIEW. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FAIRVIEW GROWTH OCTOBER 4557 080.74188 1,348,550 INSTALL 1,936 FEET OF 2 INCH, 842 FEET OF 4 INCH AND 2,008 FEET OF 8 INCH POLY ALONG JACKSON, 10TH, CLAY AND AUSTIN STREET IN KAUFMAN AND ABANDON 465 FEET OF 4 INCH AND 417 FEET OF 2 INCH POLY AND 2,148 FEET OF 3 INCH, 1,126 FEET OF 2INCH STEEL ALL CUSTOMERS KAUFMAN SYSTEM INTEGRITY DECEMBER 4558 080.74200 347,928 INSTALL 4,067 FEET OF 2 INCH, 1,348 FEET OF 4 INCH AND 3,024 FEET OF 6 INCH POLY ALONG THE STREETS OF TRINITY FALLS SUBDIVISION. RESIDENTIAL MCKINNEY GROWTH OCTOBER 4559 080.74202 107,389 INSTALL 1000 FEET OF 2 INCH POLY ALONG THE STEETS OF IRONSIDE SUBDIVSION. RESIDENTIAL DALLAS GROWTH MARCH 4560 080.74204 4,207 INSTALL 172 FEET OF 2 INCH POLY ALONG PECAN GROVE ROAD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL SHERMAN GROWTH MARCH 4561 080.74208 5,098 INSTALL 1690 FEET OF 2 INCH POLY ALONG NORTH MAIN STREET AND ABANDON 290 FEET OF 2 INCH AND 70 FEET OF 4 INCH POLY AND 1166 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY OCTOBER 4562 080.74210 907 INSTALL 1955 FEET OF 4 INCH POLY ALONG VILLAGES OF 121. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL PLANO GROWTH JUNE 4563 080.74215 49,706 INSTALL 1,845 FEET OF 4 INCH POLY ALONG LYNN LANE AND PLEASANT LANE IN COPPERAS COVE. DEVELOPER INSTALLED FACILITIES, ALL CUSTOMERS COPPERAS COVE GROWTH SEPTEMBER 4564 080.74216 220,306 INSTALL 1760 FEET OF 4 INCH POLY AND 4220 FEET OF 2 INCH POLY ALONG THE STREETS OF TRAILS OF ELIZABETH CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER 4565 080.74217 782 RELOCATE FACILITIES. INSTALL 40 FEET OF 4 INCH POLY ALONG AEROBIC LANE AND ABANDON 20 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF GREENVILLE STORM SEWER IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE RELOCATION OF FACILITIES OCTOBER 4566 080.74218 7,999 INSTALL 775 FEET OF 4 INCH POLY AND ABANDON 575 FEET OF 3 INCH STEEL AND 290 FEET OF POLY ALONG 4TH STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER 4567 080.74219 2,363 INSTALL 150 FEET OF 2 INCH POLY ALONG THE STREETS OF NEW COMMERICAL DEVELOPMET IN TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH APRIL 4568 080.74225 4,902 INSTALL 560 FEET OF 6 INCH AND 680 FEET OF 4 INCH POLY ALONG OLYMPUS BOULEVARD AND WATERMILL ROAD. ALL CUSTOMERS DALLAS GROWTH JULY 4569 080.74229 137,503 INSTALL 2,104 FEET OF 4 INCH POLY ALONG THE STREETS OF ROSEMARY RIDGE SUBDIVISION IN CROWLEY. RESIDENTIAL CROWLEY GROWTH OCTOBER 4570 080.74233 22,843 INSTALL 1,470 FEET OF 2 INCH AND 770 FEET OF 8 INCH POLY ALONG THE STREETS OF OAKMONT SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH SEPTEMBER 4571 080.74241 287,112 INSTALL 800 FEET OF 8 INCH AND 5600 FEET OF 4 INCH POLY ALONG THE STREETS OF HARVEST SUBDIVISION. RESIDENTIAL NORTHLAKE GROWTH JUNE 4572 080.74242 344,997 INSTALL 1,000 FEET OF 8 INCH, 2,010 FEET OF 6 INCH AND 5,200 FEET OF 4 INCH POLY ALONG THE STREETS OF HARVEST SUBDIVISION. RESIDENTIAL NORTHLAKE GROWTH DECEMBER 4573 080.74249 214,081 INSTALL 1285 FEET OF 4 INCH POLY AND 3445 FEET OF 2 INCH POLY ALONG THE STREETS OF LIBERTY TRAILS PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER 4574 080.74250 629,602 INSTALL 3,800 FEET OF 8 INCH POLY ALONG CEMETERY ROAD IN WISE COUNTY. ALL CUSTOMERS BOYD GROWTH DECEMBER 4575 080.74254 239,465 INSTALL 3,195 FEET OF 4 INCH AND 4,340 FEET OF 2 INCH POLY ALONG THE STREETS OF AZLE GROVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL AZLE GROWTH DECEMBER 4576 080.74257 527,920 INSTALL 1,250 FEET OF 2 INCH AND 2,000 FEET OF 4 INCH POLY ALONG DENTON DRIVE AND HAVENHURST STREET IN FARMERS BRANCH AND ABANDON 1,250 FEET OF 2 INCH AND 2,000 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY DECEMBER 4577 080.74258 47,454 INSTALL 1,500 FEET OF 4 INCH POLY ALONG THE STREETS OF UCD SAGINAW SUBDIVISION. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL SAGINAW GROWTH DECEMBER 4578 080.74259 130,601 INSTALL 1500 FEET OF 6 INCH POLY AND ABANDON 1200 FEET OF 3 INCH STEEL ALONG WYCON DRIVE ALL CUSTOMERS WACO SYSTEM IMPROVEMENT JULY 4579 080.74260 650,169 RELOCATE FACILITIES. INSTALL 3,000 OF 4 INCH AND 1,500 OF 2 INCH POLY ALONG THE STREETS OF FERRIS, TEXAS AND ABANDON 6,500 FEET OF 2 INCH, 3 INCH STEEL AND ABANDON DISTRICT REGULATOR STATION 03 IN ACCAORDAINCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FERRIS SYSTEM INTEGRITY JUNE 4580 080.74261 637 INSTALL SINGLE PHASE POWER SUPPLY AND REMOVE SOLAR PANELS AND BATTERIES FOR STATION CONTROLLER IN COLLIN COUNTY. ALL CUSTOMERS PLANO SYSTEM INTEGRITY JULY 4581 080.74264 191,525 INSTALL 2,200 FEET OF 2 INCH POLY ALONG WEST MAYFIELD ROAD IN ARLINGTON. RESIDENTIAL ARLINGTON GROWTH DECEMBER 4582 080.74266 359,524 RELOCATE FACILITIES. INSTALL 1,696 FEET OF 2 INCH, 815 FEET OF 4 INCH POLY ALONG SHACKLEFORD STREET AND ABANDON 1,687 FEET OF 2 INCH, 739 FEET OF 4 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 136 of 178 355 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4583 080.74272 2,075 INSTALL 330 FEET OF 2 INCH POLY ALONG BRIDGECREEK DRIVE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL WICHITA FALLS GROWTH JUNE 4584 080.74273 84,798 INSTALL 1,045 FEET OF 4 INCH AND 210 FEET OF 2 INCH POLY ALONG PRIVATE DRIVE G. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH DECEMBER 4585 080.74278 3,373,268 INSTALL 13,300 FEET OF 12 INCH AND 500 FEET OF 6 INCH POLY ALONG THE STREETS OF BRIDGEWATER SUBDIVISION IN MIDLOTHIA, ELLIS COUNTY. ALL CUSTOMERS MIDLOTHIAN GROWTH DECEMBER 4586 080.74281 2,854 RELOCATE FACILITIES. INSTALL 280 FEET OF 6 INCH POLY AND ABANDON 280 FEET OF 6 INCH STEEL ALONG MIDWESTERN PARKWAY TO ACCOMMODATE CITY OF WICHITA FALLS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES OCTOBER 4587 080.74283 189,080 INSTALL TEMETRY TO LARGE COMMERCIAL CUSTOMER FOR MONITORING CUSTOMER USE FOR POTENTIAL CURTAILMENT IN EXTREME WEATHER EVENTS IN DALLAS. ALL CUSTOMERS DALLAS SYSTEM IMPROVEMENT DECEMBER 4588 080.74285 91,789 INSTALL 1,957 FEET OF 8 INCH POLY ALONG LOUISIANA STREET. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS CELINA GROWTH SEPTEMBER 4589 080.74287 91,560 RELOCATE FACILITIES. INSTALL 600 FEET OF 6 INCH POLY AND ABANDON 600 FEET OF 6 INCH STEEL ALONG LAS VEGAS TRAIL TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4590 080.74288 53,831 INSTALL 6,850 FEET OF 6 INCH POLY ALONG THE STREETS OF CR 447 AND CR 728. ALL CUSTOMERS PRINCETON GROWTH DECEMBER 4591 080.74290 17,491 INSTALL 150 FEET OF 6 INCH, 935 FEET OF 4 INCH AND 977 FEET OF 2 INCH POLY ALONG THE STREETS OF CHESTER RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER 4592 080.74295 1,000,328 RELOCATE FACILITIES. INSTALL 2,990 FEET OF 4 INCH AND 690 FEET OF 2 INCH POLY ALONG SHILOH ROAD AND ABANDON 2,850 FEET OF 8 INCH, 80 FEET OF 6 INCH, 80 FEET OF 4 INCH, 560 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4593 080.74299 1,289,973 INSTALL 3,500 FEET OF 4 INCH, 1,500 FEET OF 2 INCH POLY ALONG ALMOND DRIVE AND ABANDON 1,500 FEET OF 1.25 INCH, 3,300 FEET OF 2 INCH, 150 FEET OF 3 INCH AND 600 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISISON OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY DECEMBER 4594 080.74305 393,520 INSTALL 3,400 FEET OF 2 INCH POLY AND 100 FEET OF 4 INCH STEEL CASING ALONG W. FANNIN STREET AND ABANDON DISTRICT REGULATOR STATION #18, 2,855 FEET OF 4 INCH, 379 FEET OF 3 INCH AND 40 FEET OF 2 INCH STEEL, AND 594 FEET OF 4 INCH, 437 FEET OF 3 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY DECEMBER 4595 080.74308 3,834 INSTALL DISTRICT REGULATOR STATION, 80 FEET OF 2 INCH POLY AND 250 FEET OF 4 INCH POLY ALONG ELM STREET AND ABANDON 26 FEET OF 4 INCH STEEL, 146 FEET OF 2 INCH STEEL, 191 FEET OF 4 INCH STEEL AND 105 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALVORD SYSTEM INTEGRITY OCTOBER 4596 080.74309 7,303 INSTALL DISTRICT REGULATOR STATION AND 140 FEET OF 4 INCH POLY ALONG STREETS OF CHILLICOTHE AND ABANDON DISTRICT REGULATOR STATION 02, 35 FEET OF 4 INCH POLY, 20 FEET OF 2 INCH POLY, 19 FEET OF 2 INCH STEEL AND 19 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILLICOTHE SYSTEM INTEGRITY OCTOBER 4597 080.74310 688 INSTALL DISTRICT REGULATOR STATION 04 , 575 FEET OF 2 INCH POLY AND 75 FEET OF 4 INCH POLY ALONG WEST CARPENTER STREET AND ABANDON 152 FEET OF 2 INCH STEEL, 43 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY OCTOBER 4598 080.74311 8,632 INSTALL DISTRICT REGULATOR STATION 01, 30 FEET OF 2 INCH POLY AND 30 FEET OF 4 INCH POLY ALONG STREETS OF KIRKLAND AND ABANDON DISTRICT REGULATOR STATION 01, 121 FEET OF 2 INCH STEEL, 76 FEET OF 4 INCH STEEL AND 63 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KIRKLAND SYSTEM INTEGRITY OCTOBER 4599 080.74312 2,869 INSTALL DISTRICT REGULATOR STATION 01 ALONG CHAMBERS STREET AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NEWARK SYSTEM INTEGRITY OCTOBER 4600 080.74313 900,224 RELOCATE FACILITIES. INSTALL 3,110 FEET OF 4 INCH POLY ALONG HIGHWOOD DRIVE AND ABANDON 3,105 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4601 080.74315 7,461 INSTALL DISTRICT REGULATOR STATION 08 ALONG FANNIN STREET AND ABANDON DISTRICT REGULATOR STATION 08 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA SYSTEM INTEGRITY OCTOBER 4602 080.74318 15,416 INSTALL DISTRICT REGULATOR STATION DRS01, 30 FEET OF 3 INCH, 12 FEET OF 2 INCH STEEP AND 30 FEET OF 2 INCH POLY ALONG THE STREETS OF ODELL, WILBARGER COUNTY. ALL CUSTOMERS ODELL SYSTEM INTEGRITY DECEMBER 4603 080.74320 95,969 INSTALL DISTRICT REGULATOR STATION 04, 80 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 04, 210 FEET OF 4 INCH POLY, 59 FEET OF 4 INCH STEEL, AND 37 FEET OF 4 INCH STEEL ALONG E 4TH STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY JUNE 4604 080.74321 551,675 INSTALL 3,150 FEET OF 4 INCH AND 30 FEET OF 2 INCH POLY ALONG MOTLEY DRIVE ALLEY AND ABANDON 2,490 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4605 080.74326 177,093 INSTALL 3890 FEET OF 2 INCH AND 1125 FEET OF 4 INCH POLY ALONG THE STREETS OF THE WOLF CREEK FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH APRIL 4606 080.74328 1,540 RELOCATE FACILITIES. INSTALL 700 FEET OF 4 INCH POLY ALONG WILLIAMSON DRIVE AND ABANDON 700 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES OCTOBER 4607 080.74335 406,836 INSTALL 2,437 FEET OF 4 INCH POLY AND ABANDON 2,421 FEET OF 2 INCH STEEL ALONG PECOS STREET IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 4608 080.74339 66 INSTALL 150 FEET OF 2 INCH POLY ALONG BUFFALO GAP ROAD. COMMERCIAL OR INDUSTRIAL ABILENE GROWTH MARCH 4609 080.74340 15,585 INSTALL 775 FEET OF 2 INCH POLY ALONG SAN CARLOS AND ABANDON 590 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER 4610 080.74341 346,175 INSTALL 1,800 FEET OF 2 INCH POLY ALONG AVENUE H AND ABANDON 2,170 FEET OF 4 INCH AND 80 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8,209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE 4611 080.74343 575,905 INSTALL 1,467 FEET OF 6 INCH, 1,773 FEET OF 4 INCH POLY AND ABANDON 1,467 FEET OF 6 INCH, 10 FEET OF 4 INCH, 1,763 FEET OF 3 INCH STEEL ALONG PARK ROW AVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER 4612 080.74344 652,709 INSTALL 2,736 OF 4 INCH AND 635 FEET OF 2 INCH POLY AND ABANDON 2,696 FEET OF 3 INCH, 595 OF 2 INCH STEEL ALONG PARK ROW DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 4613 080.74345 670,782 RELOCATE FACILITIES. INSTALL 1,486 FEET OF 4 INCH AND 1,733 FEET OF 2 INCH POLY AND ABANDON 875 FEET OF 4 INCH AND 1,117 FEET OF 2 INCH STEEL AND 611 FEET OF 4 INCH AND 616 FEET OF 2 INCH POLY ALONG THE STREETS OF MOORE, KELLY AND HARMON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 4614 080.74346 578,460 RELOCATE FACILITIES. INSTALL 1,657 FEET OF 4 INCH AND 1,178 FEET OF 2 INCH POLY AND ABANDON 887 FEET OF 4 INCH, 770 FEET OF 3 INCH, 1,178 FEET OF 2 INCH STEEL ALONG THE STREETS OF MEADOW, FORRESTAL AND KELLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 4615 080.74347 598,730 RELOCATE FACILITIES. INSTALL 3,821 FEET OF 2 INCH POLY AND ABANDON 3,560 FEET OF 2 INCH STEEL ALONG THE STREETS OF KELLY, FORRESTAL AND HARMONY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER MTX Additions Page 137 of 178 356 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4616 080.74348 467,978 RELOCATE FACILIITES. INSTALL 2,160 FEET OF 4 INCH POLY AND ABANDON 2,160 FEET OF 3 INCH STEEL ALONG CARSWELL TERRACE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 4617 080.74349 761,884 INSTALL 2,309 FEET OF 4 INCH, 1,151 FEET OF 2 INCH POLY ALONG WYNN TERRACE AND BIGGS TERRACE IN ARLINGTON AND ABANDON 2,309 FEET OF 4 INCH, 1,126 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 4618 080.74353 1,000,729 INSTALL 2,307 FEET OF 2 INCH AND 1,581 FEET OF 4 INCH POLY AND ABANDON 3,765 FEET OF 4 INCH STEEL ALONG FORT AVE, HARLAN AVE, AND SANGER AVE IN WACO, MCCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 4619 080.74356 1,064,160 INSTALL 1,615 FEET OF 2 INCH AND 2,300 FEET OF 4 INCH POLY AND ABANDON 3,534 FEET OF 4 INCH, 317 FEET OF 3 INCH STEEL AND 329 FEET OF 4 INCH AND 259 FEET OF 6 INCH POLY ALONG THE STREETS OF WACO AND MORROW DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 4620 080.74362 9,738 INSTALL 1628 FEET OF 2 INCH POLY MAIN AND 768 FEET OF 4 INCH POLY MAIN ALONG EAST COWAN STREET AND ABANDON 318 FEET OF 2 INCH POLY, 4 FEET OF 2 INCH STEEL, 1181 FEET OF 3 INCH STEEL, 167 FEET OF 4 INCH POLY AND 708 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY OCTOBER 4621 080.74363 62,913 INSTALL (1) 4 INCH SERVICE LINE AND (1) METER ALONG BROADWAY AND INTERSTATE 30 IN GARLAND. COMMERCIAL OR INDUSTRIAL GARLAND GROWTH JUNE 4622 080.74372 210,486 INSTALL 2,264 FEET OF 4 INCH AND 1540 FEET OF 2 INCH POLY ALONG THE STREETS OF WHITESTONE CREST SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BENBROOK GROWTH JULY 4623 080.74373 152 RELOCATE FACILITIES. INSTALL 450 FEET OF 4 INCH POLY AND ABANDON 450 FEET OF 4 INCH POLY ALONG GENERAL PARKWAY TO ACCOMMODATE MAIN OUT OF EASEMENT. ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES MARCH 4624 080.74379 16,141 INSTALL 656 FEET OF 2 INCH AND 2765 FEET OF 4 INCH POLY AND ABANDON 160 FEET OF 2 INCH, 720 FEET OF 3 INCH, AND 145 FEET OF 4 INCH STEEL ALONG EAST NCKEBBAB AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY OCTOBER 4625 080.74382 (451,041) INSTALL 918 FEET OF 6 INCH POLY ALONG INTERNATIONAL PARKWAY IN DFW AIRPORT/GRAPEVINE TO ACCOMMODATE CONSTRUCTION OF NEW COMMERCIAL CUSTOMERS IN TERMINAL C AND PROPOSED BOILER PLANT. COMMERCIAL OR INDUSTRIAL GRAPEVINE GROWTH DECEMBER 4626 080.74386 404,073 INSTALL DISTRICT REGULATOR STATION AND 190 FEET OF 6 INCH, 1150 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY ALONG COLLEGE STREET AND ABANDON DISTRICT REGULATOR STATION AND 3,135 FEET OF 6 INCH, 500 FEET OF 4 INCH, 610 FEET OF 3 INCH STEEL, 225 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY DECEMBER 4627 080.74388 9,502 INSTALL 2,476 FEET OF 6 INCH, 1560 FEET OF 4 INCH AND 2,458 FEET OF 2 INCH POLY ALONG THE STREETS OF DEVINE LAKE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JULY 4628 080.74390 9,435 INSTALL 3,899 FEET OF 2 INCH POLY ALONG THE STREETS OF MORNINGSTAR SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER 4629 080.74394 1,413 INSTALL 500 FEET OF 6 INCH POLY ALONG FARMERS MARKET 548. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORNEY GROWTH SEPTEMBER 4630 080.74397 1,328 RELOCATE FACILITIES. INSTALL 60 FEET OF 4 INCH POLY AND ABANDON 40 FEET OF 4 INCH STEEL ALONG CASCADE DRIVE TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 4631 080.74398 6,323 INSTALL 685 FEET OF 2 INCH POLY ALONG FM 1325 IN ROUND ROCK, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITY. COMMERCIAL OR INDUSTRIAL ROUND ROCK GROWTH DECEMBER 4632 080.74402 394,042 INSTALL 1,112 FEET OF 4 INCH POLY AND ABANDON 195 FEET OF 2 INCH POLY AND 716 FEET OF 2 INCH, 103 FEET OF 3 INCH STEEL ALONG AUSTIN AND TRAVIS STREET IN ACCORDANCE TO THE TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS ROANOKE SYSTEM INTEGRITY SEPTEMBER 4633 080.74404 281,884 INSTALL 1,730 FEET OF 2 INCH POLY ALONG VINETTA DRIVE AND ABANDON 1,737 FEET OF 2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JULY 4634 080.74408 155,417 INSTALL 1825 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG CHICAGO STREET AND ABANDON 110 FEET OF 2 INCH POLY AND 2465 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4635 080.74409 95,563 INSTALL 2635 FEET OF 2 INCH POLY ALONG PUEBLO STREET AND ABANDON 635 FEET OF 2 INCH POLY AND 665 FEET OF 1.25 INCH AND 1450 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4636 080.74410 876,083 INSTALL 2,165 FEET OF 2 INCH AND 1,020 FEET OF 4 INCH POLY AND ABANDON 1,075 FEET OF 6 INCH AND 2,085 FEET OF 3 INCH STEEL. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4637 080.74412 107 INSTALL 300 FEET OF 2 INCH POLY ALONG SECOND STREET. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL ROYSE CITY GROWTH MARCH 4638 080.74415 1,021,013 INSTALL 2,325 FEET OF 2 INCH AND 2,675 FEET OF 4 INCH POLY AND ABANDON 520 FEET OF 6 INCH, 1,485 FEET OF 4 INCH, AND 2,995 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JUNE 4639 080.74416 667,565 INSTALL 2, 325 FEET OF 2 INCH, 660 FEET OF 4 INCH POLY AND ABANDON 340 FEET OF 6 INCH, 2,990 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JUNE 4640 080.74417 715,967 INSTALL 2,325 FEET OF 2 INCH AND 895 FEET OF 4 INCH POLY AND ABANDON 675 FEET OF 6 INCH, 2,355 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4641 080.74418 852,514 INSTALL 3,565 FEET OF 4 INCH POLY AND ABANDON 3,565 FEET OF 6 INCH STEEL IN THE ALLEY SOUTH OF GROSS FROM FREEPORT TO LA PRADA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4642 080.74419 824,546 INSTALL 3,565 FEET OF 2 INCH AND 325 FEET OF 4 INCH POLY AND ABANDON 325 FEET OF 6 INCH AND 3,460 FEET OF 3 INCH STEEL. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4643 080.74421 870,829 INSTALL 3,795 FEET OF 2 INCH AND 635 FEET OF 4 INCH POLY AND ABANDON 660 FEET OF 6 INCH, 3,600 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JULY 4644 080.74422 921,807 INSTALL 1,615 FEET OF 2 INCH AND 1,745 FEET OF 4 INCH POLY AND ABANDON 1,815 FEET OF 4 INCH, 1,020 FEET OF 3 INCH, 650 FEET OF 2 INCH STEEL AND 10 FEET OF 2 INCH POLY. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4645 080.74424 780,720 INSTALL 3,180 FEET OF 4 INCH AND 250 FEET OF 2 INCH POLY ALONG OATES DRIVE AND ABANDON 2,470 FEET OF 8 INCH, 200 FEET OF 4 INCH, 400 FEET OF 3 INCH STEEL IN ACCORDDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4646 080.74425 677,806 INSTALL 2,420 FEET OF 2 INCH POLY ALONG HIGHWOOD DRIVE AND ABANDON 2,420 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4647 080.74426 9,125 INSTALL 2060 FEET OF 2 INCH POLY ALONG CASA OAKS DRIVE AND ABANDON 1070 FEET OF 6 INCH AND 1070 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4648 080.74430 221,097 INSTALL 1,483 FEET OF 4 INCH POLY ALONG MOBERLY STREET AND ABANDON 1,397 FEET ON 2 INCH STEEL AND 72 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 4649 080.74433 1,331,714 INSTALL 100 FEET OF 4 INCH, 15 FEET OF 6 INCH AND 2,900 FEET OF 8 INCH POLY AND ABANDON 2,170 FEET OF 8 INCH, 150 FEET OF 6 INCH, 120 FEET OF 3 INCH, 130 FEET OF 2 INCH STEEL AND 50 FEET OF 3 INCH POLY ALONG SOUTH POLK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY NOVEMBER 4650 080.74434 0 INSTALL 1 REGULATOR STATION AND ABANDON 1 REGULATOR STATION IN PARADISE COUNTY. ALL CUSTOMERS PARADISE SYSTEM INTEGRITY JANUARY MTX Additions Page 138 of 178 357 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4651 080.74435 30,243 RELOCATE FACILITIES. INSTALL 780 FEET OF 2 INCH POLY AND ABANDON 760 FEET OF 2 INCH STEEL ALONG JEFFERSON STREET TO ACCOMMODATE CITY OF COCKRELL HILL STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COCKRELL HILL RELOCATION OF FACILITIES OCTOBER 4652 080.74438 966 INSTALL 213 FEET OF 2 INCH POLY ALONG 13TH STREET. ALL CUSTOMERS GEORGETOWN SYSTEM IMPROVEMENT JULY 4653 080.74439 557,704 INSTALL 2,334 FEET OF 2 INCH POLY ALONG TIMBERVIEW AND ABANDON 2,310 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JULY 4654 080.74440 611,389 INSTALL 2,455 FEET OF 4 INCH POLY ALONG RUTZ AND ABANDON 1,950 FEET OF 2 INCH , 355 FEET OF 1.25 INCH POLY AND 60 FEET OF 1.25 STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4655 080.74441 503,901 INSTALL 1,660 FEET OF 2 INCH POLY ALONG CHIHUAHUA AND ABANDON 1,890 FEET OF 2 INCH STEEL AND 395 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4656 080.74442 841,156 INSTALL 3,090 FEET ON 2 INCH, 515 FEET OF 4 INCH POLY ALONG KRAT STREET AND ABANDON 3,820 FEET OF 2 INCH, STEEL AND 190 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JULY 4657 080.74443 459,935 INSTALL 2,925 FEET OF 2 INCH POLY ALONG MERRELL STREET AND ABANDON 2,335 FEET OF 4 INCH, 65 FEET OF 3 INCH, 645 FEET OF 2 INCH STEEL AND 25 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JULY 4658 080.74447 8,329 INSTALL 215 FEET OF 4 INCH POLY ALONG GOWDY STREET. COMMERCIAL OR INDUSTRIAL WHITEWRIGHT GROWTH JUNE 4659 080.74450 2,463 RELOCATE FACILITIES. INSTALL 275 FEET OF 4 INCH AND 85 FEET OF 2 INCH POLY ALONG KENLEY STREET AND ABANDON 275 FEET OF 4 INCH AND 130 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4660 080.74452 (33) INSTALL 135 FEET OF 2 INCH POLY ALONG STREETS OF PANDA EXPRESS. COMMERCIAL OR INDUSTRIAL ATHENS GROWTH JANUARY 4661 080.74454 636,520 INSTALL 2,664 FEET OF 4 INCH POLY AND ABANDON 2,664 FEET OF 3 INCH STEEL ALONG CONNALLY TERRACE SUBDIVISION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER 4662 080.74457 2,722 RELOCATE FACILITIES. INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 299 FEET OF 4 INCH POLY AND 84 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY PAVING PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON RELOCATION OF FACILITIES OCTOBER 4663 080.74458 301,069 INSTALL 2,125 FEET OF 2 INCH POLY AND ABANDON 2,020 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY ALONG THE STREETS OF BIGGS TERRACE AND BIGGS CIRCLE IN ACCORDANE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 4664 080.74459 1,440 INSTALL DISTRICT REGULATOR STATION 18 ALONG BAIRD STREET AND ABANDON DISTRICT REGULATOR STATION 18 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER 4665 080.74461 151,474 INSTALL 4,811 FEET OF 2 INCH POLY ALONG THE STREETS OF TRINITY FALLS PU7- 2. RESIDENTIAL MCKINNEY GROWTH JULY 4666 080.74466 1,845,593 INSTALL 2,519 FEET OF 8 INCH POLY ALONG FISHER STREET AND 1,300 FEET OF 4 INCH POLY ALONG HODGE STREET AND ABANDON 135 FEET OF 4 INCH, 140 FEET OF 2 INCH, 115 FEET OF 3 INCH, 330 FEET OF 6 INCH POLY AND 490 FEET OF 2 INCH, 445 FEET OF 3 INCH, AND 1,625 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY DECEMBER 4667 080.74471 1,604,995 INSTALL 2,600 FEET OF 8 INCH, 505 FEET OF 2 INCH, AND 100 FEET OF 4 INCH POLY AND ABANDON 2,620 FEET OF 8 INCH, 485 FEET OF 4 INCH AND 565 FEET OF 3 INCH STEEL ALONG POLK FROM CAMP WISDOM SOUTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4668 080.74475 372,310 INSTALL 2,795 FEET OF 2 INCH POLY ALONG SOUTH BAUGH STREET AND ABANDON 2,745 FEET OF 2 INCH STEEL AND 720 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS ALVARADO SYSTEM INTEGRITY JULY 4669 080.74477 73,715 RELOCATE FACILITIES. INSTALL 160 FEET OF 2 INCH POLY AND ABANDON ONE 1.25 INCH POLY ALONG OLDHAM LANE. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 4670 080.74484 5,531 INSTALL 335 FEET OF 4 INCH POLY ALONG MIDPOINT DRIVE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL LANCASTER GROWTH JUNE 4671 080.74485 524 INSTALL 2,805 FEET OF 2 INCH POLY ALONG THE STREETS OF VILLAGES OF CHARLESTON SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GLENN HEIGHTS GROWTH JUNE 4672 080.74486 160 INSTALL 400 FEET OF 2 INCH POLY ALONG 5TH STREET. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MANSFIELD GROWTH MARCH 4673 080.74488 7,327 INSTALL 6,778 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER 4674 080.74490 342,829 INSTALL 1,200 FEET OF 2 INCH , 1,130 FEET OF 4 INCH POLY ALONG COWAN STREET AND ABANDON 16 FEET OF 2 INCH STEEL, 160 FEET OF 3 INCH POLY, 1,170 FEET OF 3 INCH STEEL, 120 FEET OF 4 INCH POLY, 1,045 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS MART SYSTEM INTEGRITY JUNE 4675 080.74491 2,539 RELOCATE FACILITIES. INSTALL 180 FEET OF 4 INCH AND 26 FEET OF 2 INCH POLY AND ABANDON 180 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DALLAS TXDOT ROADWAY PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 4676 080.74492 163,808 INSTALL 1,300 FEET OF 4 INCH POLY ALONG MOUSER WAY IN MANSFIELD, TARRANT COUNTY. ALL CUSTOMERS MANSFIELD GROWTH DECEMBER 4677 080.74493 181,573 INSTALL 2,800 FEET OF 2 INCH AND 2,000 FEET OF 4 INCH POLY ALONG THE STREETS OF NEW WATSON BRANCH SUBDIVISION IN MANSFIELD, TARRANT COUNTY. RESIDENTIAL MANSFIELD GROWTH DECEMBER 4678 080.74496 11,413 INSTALL 570 FEET OF 4 INCH AND 2,840 FEET OF 2 INCH POLY ALONG THE STREETS OF SKYLINE ESTATES SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTCHINS GROWTH SEPTEMBER 4679 080.74499 412,173 INSTALL 2,426 FEET OF 6 INCH POLY ALONG THE STREETS OF NORTH GROVE BLVD IN THE CITY OF WAXAHACHIE. ALL CUSTOMERS WAXAHACHIE GROWTH DECEMBER 4680 080.74501 44,213 RELOCATE FACILITIES. INSTALL 1000 FEET OF 2 INCH POLY AND ABANDON 1000 FEET OF 2 INCH POLY ALONG CINNABAR DRIVE TO ACCOMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 4681 080.74505 35,619 RELOCATE FACILITIES. INSTALL 50 FEET OF 4 INCH POLY AND ABANDON 50 FEET OF 4 INCH POLY ALONG GREENVILLE AVENUE TO ACCOMMODATE DEVELOPER INSTALLED FACILITY. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES APRIL 4682 080.74508 46,852 INSTALL 200 FEET OF 2 INCH POLY AND 110 FEET OF 4 INCH STEEL ALONG THE STREETS OF WILLOW CREEK RETAIL CENTER. COMMERCIAL OR INDUSTRIAL ANNA GROWTH SEPTEMBER 4683 080.74509 50,617 INSTALL 627 FEET OF 4 INCH POLY ALONG THE STREETS OF CLEAR CREEK RANCH SUBDIVISION. DEVELOP INSTALLED FACILITIES. ALL CUSTOMERS ROUND ROCK GROWTH SEPTEMBER 4684 080.74510 1,445 INSTALL 290 FEET OF 4 INCH POLY AND ABANDON 299 FEET OF 3 INCH STEEL AND 64 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY OCTOBER 4685 080.74511 560,723 INSTALL 2,910 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 4 INCH, 2215 FEET OF 3 INCH AND 375 FEET OF 8 INCH STEEL ALONG THE STREETS OF COOGAN DRIVE AND ROYAL LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4686 080.74514 632,553 INSTALL 3,395 FEET OF 2 INCH POLY NEAR THE INTERSECTION OF ALLEGHENY DRIVE AND COOGAN DRIVE AND ABANDON 902 FEET OF 2 INCH, 2,790 FEET OF 3 INCH STEEL AND 300 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4687 080.74515 832,176 INSTALL 3,270 FEET OF 2 INCH AND 1,010 FEET OF 4 INCH POLY AND ABANDON 575 FEET OF 2 INCH, 2,325 FEET OF 3 INCH AND 1,005 FEET OF 6 INCH STEEL ALONG THE ALLEY NORTH AND SOUTH OF FLOWERDALE LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 139 of 178 358 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4688 080.74532 783,805 INSTALL 1,635 FEET OF 2 INCH AND 1,915 FEET OF 4 INCH POLY ALONG WOODWIND STREET AND ABANDON 1,100 FEET OF 2 INCH, 1,815 FEET OF 4 INCH AND 430 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4689 080.74533 93,883 INSTALL 2,750 FEET OF 2 INCH POLY ALONG THE STREETS OF THE WEST CROSSING SUBDIVISION IN ANNA. RESIDENTIAL ANNA GROWTH OCTOBER 4690 080.74534 157,165 INSTALL 3,520 FEET OF 2 INCH AND 900 FEET OF 6 INCH POLY ALONG THE STREETS OF WEST CROSSING SUBDIVISION IN ANNA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ANNA GROWTH DECEMBER 4691 080.74539 1,630,174 INSTALL 3,000 FEET OF 16 INCH STEEL AND ABANDON 3,000 FEET OF 16 INCH STEEL ALONG ALEMEDA STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JULY 4692 080.74540 (468) INSTALL 635 FEET OF 2 INCH POLY ALONG TANANGER SPRINGS ROAD. RESIDENTIAL DENISON GROWTH JANUARY 4693 080.74543 61,842 INSTALL 1,420 FEET OF 2 INCH POLY ALONG THE STREETS OF TRINITY FALLS PU7- 4 IN MCKINNEY. RESIDENTIAL MCKINNEY GROWTH JULY 4694 080.74544 45,348 INSTALL 2421 FEET OF 2 INCH, 2872 FEET OF 4 INCH AND 1097 FEET OF 8 INCH POLY ALONG THE STREETS OF SALERNO PHASE 2 AND 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH JULY 4695 080.74545 903,152 INSTALL 3,750 FEET OF 2 INCH POLY ALONG KRAFT STREET AND ABANDON 3,175 FEET OF 2 INCH AND 105 FEET OF 1.25 INCH STEEL AND 470 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JULY 4696 080.74553 (4,725) ABANDON 4,101 FEET OF 6 INCH AND 2,135 FEET OF 2 INCH STEEL ALONG THE STREETS OF WILMER IN DALLAS COUNTY. ALL CUSTOMERS WILMER RELOCATION OF FACILITIES OCTOBER 4697 080.74554 20,352 INSTALL 700 FEET OF 4 INCH POLY ALONG LAKESIDE VILLAGE BOULEVARD AND LAKESIDE PARKWAY INTERSECTION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FLOWER MOUND GROWTH JUNE 4698 080.74556 119,945 INSTALL 2585 FEET OF 2 INCH POLY ALONG SHAW STREET AND ABANDON 2555 FEET OF 2 INCH STEEL AND 30 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4699 080.74559 67,730 INSTALL 2600 FEET OF 2 INCH POLY ALONG LIFE AVENUE AND ABANDON 2515 FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4700 080.74565 512,058 INSTALL 3,288 FEET OF 4 INCH, 5 FEET OF 2 INCH POLY ALONG OLD LIMESTONE COUNTY ROAD AND ABANDON 202 FEET OF 2 INCH, 2,055 FEET OF 4 INCH STEEL AND 1,025 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY DECEMBER 4701 080.74568 855,161 INSTALL 2,500 FEET OF 2 INCH AND 1,150 FEET OF 4 INCH POLY ALONG GRIM AVENUE AND GORMAN AVENUE IN WACO AND ABANDON 2,100 FEET OF 2 INCH, 740 FEET OF 4 INCH STEEL AND 302 FEET OF 2 INCH AND 470 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 4702 080.74571 148,989 INSTALL 175 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #01 AND ABANDON 375 FEET OF 3 INCH STEEL AND DISTRICT REGULATOR STATION #01 ALONG MAIN STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAINT JO SYSTEM INTEGRITY DECEMBER 4703 080.74572 125,790 INSTALL DISTRICT REGULATOR STATION #02 ALONG SOUTH LINE STREET IN SAINT JO AND ABANDON DISTRICT REGULATOR STATION #02 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAINT JO SYSTEM INTEGRITY DECEMBER 4704 080.74573 74,372 INSTALL 2130 FEET OF 4 INCH POLY AND 3615 FEET OF 2 INCH POLY ALONG THE STREETS IF SENDERA RANCH DEVELOPMENT. RESIDENTIAL FORT WORTH GROWTH JULY 4705 080.74574 201,095 INSTALL 1,574 FEET OF 4 INCH AND 478 FEET OF 2 INCH AND 852 FEET OF 8 INCH POLY ALONG THE STREETS OF VENTAN SUBDIVSION. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER 4706 080.74575 176,255 INSTALL 1,880 FEET OF 2 INCH POLY ALONG HOUSTON STREET AND CUTLER STREET IN TIOGA AND ABANDON DISTRICT REGULATOR STATION #01 AND 947 FEET OF 4 INCH, 3 FEET OF 3 INCH STEEL AND 1,380 FEET OF 4 INCH AND 61 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TIOGA SYSTEM INTEGRITY DECEMBER 4707 080.74578 3 INSTALL 400 FEET OF 2 INCH POLY ALONG TM WEST PARKWAY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS WEST GROWTH JANUARY 4708 080.74580 3,934 INSTALL DISTRICT REGULATOR STATION 01 ALONG WEST MAIN STREET AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELLS SYSTEM INTEGRITY OCTOBER 4709 080.74582 133,709 INSTALL DISTRICT REGULATOR STATION #06 AT INTERSECTION OF NORTH BOND STREET AND EAST ALAMEDA STREET IN IOWA PARK AND ABANDON REGULATOR DISTRICT STATION #06 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY DECEMBER 4710 080.74583 93,343 INSTALL DISTRICT REGULATOR STATION #07 AT THE INTERSECTION OF NORTH COLORADO STREET AND WEST TEXAS AVENUE IN IOWA PARK AND ABANDON DISTRICT REGULATOR STATION #07 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY DECEMBER 4711 080.74586 91,578 INSTALL DISTRICT REGULATOR STATION #101 AND 125 FEET OF 2 INCH AND 50 FEET OF 4 INCH POLY ALONG PARK STREET AND ABANDON 20 FEET OF 2 INCH, 50 FEET OF 4 INCH POLY AND 10 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION #101 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY JULY 4712 080.74589 263,787 INSTALL 2,500 FEET OF 2 INCH POLY AND ABANDON 1,842 FEET OF 2 INCH POLY, 80 FEET OF 2 INCH, 463 FEET OF 3 INCH STEEL AND 4 FEET OF 3 INCH POLY AND DISTRICT REGULATOR STATION 11 IN VAN ALSTYNE, GRAYSON COUNTY. ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY DECEMBER 4713 080.74591 157,063 INSTALL 325 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #53 ALONG NORTH BROADWAY STREET AND ABANDON 19 FEET OF 3 INCH, 303 FEET OF 4 INCH, AND 16 FEET OF 6 INCH POLY AND 41 FEET OF 3 INCH AND 12 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION #53 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 4714 080.74592 210,207 INSTALL 975 FEET OF 2 INCH AND 45 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #20 ALONG 15TH STREET AND ABANDON 1,125 FEET OF 4 INCH, 23 FEET OF 2 INCH POLY AND 109 FEET OF 4 INCH, 25 FEET OF 8 INCH AND 385 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 4715 080.74593 310,866 INSTALL 5,600 FEET OF 2 INCH POLY ALONG THE ALLEYS OF PHASE 1 OF CITY POINT. RESIDENTIAL NORTH RICHLAND HILLS GROWTH JUNE 4716 080.74595 169,449 INSTALL 2,640 FEET OF 2 INCH POLY ALONG THE STREETS OF CITY POINT SUBDIVISION IN NORTH RICHLAND HILLS, TARRANT COUNTY. RESIDENTIAL NORTH RICHLAND HILLS GROWTH DECEMBER 4717 080.74599 213,980 INSTALL DISTRICT REGULATOR STATION #25 AT THE INTERSECTION OF NORTH AVENUE B AND EAST MAIN STREET IN OLNEY AND ABANDON DISTRICT REGULATOR STATION #25 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY SYSTEM INTEGRITY OCTOBER 4718 080.74600 671 INSTALL 3170 FEET OF 2 INCH POLY ALONG THE STREETS OF MORNINGSTAR SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH APRIL 4719 080.74601 8,732 INSTALL 290 FEET OF 2 INCH POLY AND 150 FEET OF 4 INCH POLY AND ABANDON 460 FEET OF 2 INCH POLY AND 140 FEET OF 3 INCH POLY ALONG AMHERST DRIVE TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER 4720 080.74603 151,274 INSTALL DISTRICT REGULATOR STATION #08 ALONG HUGHES STREET IN QUANAH AND ABANDON DISTRICT REGULATOR STATION #08 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY DECEMBER 4721 080.74604 145,421 INSTALL DISTRICT REGULATOR STATION #13 AND 500 FEET OF 2 INCH, 45 FEET OF 4 INCH POLY ALONG MERCER STREET IN QUANAH AND ABANDON DISTRICT REGULATOR STATION #13 AND 133 FEET OF 2 INCH AND 37 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY DECEMBER 4722 080.74605 539 INSTALL 630 FEET OF 2 INCH POLY ALONG WOOD STREET. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL ATHENS GROWTH MARCH MTX Additions Page 140 of 178 359 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4723 080.74606 125,718 INSTALL DISTRICT REGULATOR STATION #01 ALONG ALBERT BROADFOOT STREET IN BONHAM AND ABANDON DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH THE RAILROAD COMMSSION TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY SEPTEMBER 4724 080.74609 307,824 INSTALL DISTRICT REGULATOR STATION #20 AND ABANDON DISTRICT REGULATOR STATION #20 IN DENISON, GRAYSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY DECEMBER 4725 080.74610 71,963 INSTLL 30 FEET OF 2 INCH AND 40 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #04 ALONG WEST FERN STREET AND NORTH WOODS STREET IN SHERMAN AND ABANDON DISTRICT REGULATOR STATION #04. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY DECEMBER 4726 080.74615 52,737 INSTALL 2550 FEET OF 4 INCH AND 135 FEET OF 2 INCH POLY ALONG THE STREETS OF DALLAS AND ABANDON 2570 FEET OF 2 INCH STEEL AND 75 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4727 080.74617 215,156 INSTALL 870 FEET OF 4 INCH POLY ALONG SHEPHERD STREET AND ABANDON 847 FEET OF 4 INCH STEEL ADN 25 FEET OF 4 INCH POLY TO ELIMINATE UNREPAIRABLE LEAK IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY DECEMBER 4728 080.74619 864 RELOCATE FACILITIES. INSTALL 32 FEET OF 4 INCH POLY ALONG MORGAN AVENUE AND ABANDON 22 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF DALLAS STORM SEWER PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 4729 080.74623 533,423 INSTALL 1,812 FEET OF 4 INCH, 510 FEET OF 2 INCH POLY ALONG MOBERLY STREET AND ABANDON 2,282 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 4730 080.74625 337,916 INSTALL 1480 FEET OF 2 INCH POLY ALONG HOMELAND STREET AND ABANDON 1285 FEET OF 2 INCH STEEL AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4731 080.74629 5,651 INSTALL 2,207 FEET OF 4 INCH AND 3,623 FEET OF 2 INCH POLY ALONG THE STREETS OF PARMER RANCH SUBDIVISION. DEVEOLOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER 4732 080.74630 61,034 INSTALL 5,419 FEET OF 4 INCH AND 4,720 FEET OF 2 INCH POLY ALONG THE STREETS OF LIVELY TRACT SUBDIVISION IN GEORGETOWN. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER 4733 080.74631 143,530 RELOCATE FACILITIES. RELOCATE 11 SERVICE LINES IN THE CITY OF KELLER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY SEPTEMBER 4734 080.74633 155,144 RELOCATE FACILITIES. INSTALL 501 FEET OF 4 INCH POLY AND ABANDON 501 FEET OF STEEL ALONG PEARSON LANE. INSTALL 107 FEET OF 2 INCH POLY AND ABANDON 170 FEET OF 2 INCH STEEL ALONG BOURLAND ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY OCTOBER 4735 080.74636 170,142 RELOCATE FACILITIES. INSTALL 45 FEET OF 2 INCH POLY AND ABANDON 45 FEET STEEL ALONG CHANDLER ROAD. INSTALL 67 FEET OF 4 INCH POLY AND ABANDON 67 FEET OF 4 INCH STEEL ALONG SOUTH PATE ORR ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY OCTOBER 4736 080.74642 968,300 INSTALL 790 FEET OF 2 INCH AND 3,150 FEET OF 4 INCH POLY ALONG MEREDITH FROM SOUTH COCKRELL HILL TO SOUTH GILPIN AVENUE IN DALLAS AND ABANDON 250 FEET OF 2 INCH AND 3,700 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4737 080.74643 118,234 INSTALL 1,000 FEET OF 2 INCH POLY ALONG PINE STREET AND ABANDON 460 FEET OF 4 INCH STEEL, AND 25 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY JULY 4738 080.74644 194,226 RELOCATE FACILITIES. INSTALL 845 FEET OF 4 INCH POLY AND ABANDON 545 FEET OF 2 INCH STEEL, 460 FEET OF 4 INCH STEEL, AND 385 FEET OF 4 INCH POLY ALONG COLLINS STREET TO ACCOMODATE CITY OF ARLINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES OCTOBER 4739 080.74645 1,957,175 INSTALL 7,353 FEET OF 12 INCH POLY ALONG THE STREETS OF SILO MILLS SUBDIVISION IN JOSHUA. ALL CUSTOMERS JOSHUA GROWTH DECEMBER 4740 080.74647 620,545 INSTALL 1,790 FEET OF 2 INCH AND 635 FEET OF 4 INCH POLY AND ABANDON 1,790 FEET OF 2 INCH AND 635 FEET OF 4 INCH STEEL ALONG SOUTH GILPIN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4741 080.74648 697,742 INSTALL 1,550 FEET OF 8 INCH POLY ALONG DAVIS STREET, INSTALL 1,295 FEET OF 2 INCH POLY ALONG CRANFORD STREET AND ABANDON 440 FEET OF 4 INCH POLY, 610 FEET OF 4 INCH, 390 FEET OF 3 INCH, 110 FEET OF 2 INCH 1,665 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY DECEMBER 4742 080.74649 536 INSTALL 310 FEET OF 4 INCH AND 940 FEET OF 2 INCH POLY ALONG NOLAN DRIVE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL SOUTHLAKE GROWTH OCTOBER 4743 080.74650 1,490,392 INSTALL 1,370 FEET OF 2 INCH AND 5,055 FEET OF 4 INCH POLY AND ABANDON 54 FEET OF 1.25 INCH, 3,295 FEET OF 2 INCH, 320 FEET OF 3 INCH , AND 6,639 FEET OF 4 INCH STEEL, 915 FEET OF 4 INCH, 1,937 FEET OF 2 INCH POLY ALONG THE STREETS OF THE CITY OF GORMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORMAN SYSTEM INTEGRITY DECEMBER 4744 080.74653 4,529 INSTALL 140 FEET OF 2 INCH POLY ALONG BLACKLAND COURT. RESIDENTIAL DALLAS GROWTH JULY 4745 080.74655 6,437,105 INSTALL 24,715 FEET OF 8 INCH STEEL FROM V36 TO L8C ALONG WILLIAM FITCH PARKWAY IN COLLEGE STATION. ALL CUSTOMERS COLLEGE STATION SYSTEM IMPROVEMENT DECEMBER 4746 080.74657 257,563 INSTALL 1,320 FEET OF 4 INCH POLY AND ABANDONING 1,312 FEET OF 4 INCH STEEL ALONG THE ALLEY OF LAGONA AVE AND DENVER AVE IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4747 080.74660 29,173 INSTALL 1,040 FEET OF 4 INCH POLY ALONG CEDARDALE ROAD AND HONEYSUCKLE ROAD IN DALLAS. COMMERCIAL OR INDUSTRIAL DALLAS GROWTH DECEMBER 4748 080.74662 3,497 INSTALL 100 FEET OF 2 INCH POLY ALONG SCOTT LANE. RESIDENTIAL PILOT POINT GROWTH SEPTEMBER 4749 080.74663 482,395 INSTALL 1,890 FEET OF 2 INCH POLY ALONG PROVINCE LANE ALLEY AND ABANDON 1,890 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4750 080.74664 677,619 INSTALL 3,090 FEET OF 2 INCH POLY ALONG LARRY DRIVE ALLEY AND ABANDON 3,090 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4751 080.74665 809,970 INSTALL 3,140 FEET OF 2 INCH POLY AND ABANDON 1,700 FEET OF 3 INCH, 1440 FEET OF 3 INCH STEEL ALONG HEALEY DRIVE ALLEY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4752 080.74666 1,151,858 INSTALL 3,775 FEET OF 2 INCH POLY AND ABANDON 3,775 FEET OF 2 INCH STEEL ALONG ORLANDO COURT AND MATHER COURT IN ACCORDANCE WITH RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4753 080.74667 41,301 INSTALL 3,000 FEET OF 2 INCH, 600 FEET OF 6 INCH POLY ALONG THE STREETS OF AUSTIN'S COLONY PHASE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH OCTOBER 4754 080.74668 98,395 INSTALL A HALF SOLE TO ADDRESS LONG SEAM ANOMALIES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4755 080.74669 235,920 INSTALL 2,247 FEET OF 2 INCH POLY ALONG MILBY ROAD AND ABANDON 300 FEET OF 2 INCH STEEL AND 1,855 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER 4756 080.74671 407,006 INSTALL 2,853 FEET OF 2 INCH POLY ALONG JAMES STREET AND GARDEN PARK COURT AND ABANDON 1,675 FEET OF 2 INCH STEEL AND 755 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER 4757 080.74672 421,471 INSTALL 3,081 FEET OF 2 INCH POLY ALONG CALES DRIVE AND ABANDON 2,650 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 4758 080.74673 419,733 INSTALL 2,518 FEET OF 2 INCH POLY ALONG PONTIAC DRIVE AND ABANDON 1,460 FEET OF 3 INCH, 535 FEET OF 4 INCH STEEL, 670 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 4759 080.74674 313,853 INSTALL 1,931 FEET OF 4 INCH AND 1,018 FEET OF 2 INCH POLY ALONG STRAIT LANE AND MIBLY ROAD AND ABANDON 1,455 FEET OF 3 INCH STEEL, AND 210 FEET OF 3 INCH, 1,140 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER MTX Additions Page 141 of 178 360 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4760 080.74675 386,804 INSTALL 1,469 FEET OF 4 INCH AND 877 FEET OF 2 INCH POLY ALONG CLOVER PARK DRIVE AND ABANDON 1,380 FEET OF 4 INCH, 480 FEET OF 2 INCH STEEL, 100 FEET OF 2 INCH AND 320 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 4761 080.74676 557,309 INSTALL 922 FEET OF 4 INCH AND 1,917 FEET OF 2 INCH POLY ALONG PONTIAC DRIVE AND LOMBARDY LANE IN ARLINGTON AND ABANDON 1,905 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 4762 080.74677 567,758 INSTALL 2,667 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY ALONG PECANDALE DRIVE AND WAGGONER DRIVE IN ARLINGTON AND ABANDON 2,660 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 4763 080.74678 422,926 INSTALL 2,345 FEET OF 4 INCH AND 847 FEET OF 2 INCH POLY ALONG RAVENWOD DRIVE, PONTIAC DRIVE AND WESTVIEW TERRACE IN ARLINGTON. ABANDON 2,360 FEET OF 4 INCH AND 590 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 4764 080.74679 401,041 INSTALL 1,320 FEET OF 4 INCH AND 938 FEET OF 2 INCH POLY ALONG ARTHUR DRIVE AND SHERWOOD DRIVE AND ABANDON 1,305 FEET OF 4 INCH, 520 FEET OF 3 INCH AND 115 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 4765 080.74680 532,199 INSTALL 1,598 FEET OF 4 INCH AND 1,506 FEET OF 2 INCH POLY ALONG EASY STREET, VALLEY AVE AND WESTCREST DRIVE IN ARLINGTON AND ABANDON 1,600 FEET OF 4 INCH, 1,050 FEET OF 3 INCH AND 220 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 4766 080.74681 482,151 INSTALL 2,402 FEET OF 4 INCH POLY ALONG WAGGONER DRIVE, WHITNEY LANE AND TURPIN DRIVE IN ARLINGTON AND ABANDON 2,335 FEET OF 4 INCH STEEL AND 55 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 4767 080.74682 308,607 INSTALL 1,221 FEET OF 4 INCH AND 321 FEET OF 2 INCH POLY ALONG DUNCAN COURT AND RAVENWOOD DRIVE IN ARLINGTON. ABANDON 1,140 FEET OF 4 INCH AND 320 FEET OF 2 INCH STEEL, 80 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER 4768 080.74684 1,333,741 INSTALL 4,435 FEET OF 2 INCH POLY ALONG SOUTH RANDOLPH DRIVE AND ABANDON 4,405 FEET OF 2 INCH STEEL AND 30 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4769 080.74685 21,869 RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY AND ABANDON 330 FEET OF 4 INCH, 10 FEET OF 3 INCH STEEL AND 50 FEET OF 3 INCH AND 10 FEET OF 4 INCH POLY ALONG ENNIS AVENUE TO ACCOMODATE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4770 080.74686 25,112 INSTALL 225 FEET OF 2 INCH POLY ALONG PRIVATE DRIVE IN THE CITY OF COLLEGE STATION. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH SEPTEMBER 4771 080.74688 109 INSTALL 335 FEET OF 2 INCH POLY ALONG JUNCTION DRIVE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL BRYAN GROWTH JUNE 4772 080.74691 76,688 INSTALL 510 FEET OF 2 INCH POLY ALONG MEDPARK DRIVE IN DENTON, DENTON COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL DENTON GROWTH DECEMBER 4773 080.74692 154,215 RELOCATE FACILITIES. RELOCATE 147 FEET OF 2 INCH, 30 FEET OF 6 INCH POLY AND ABANDON 22 FEET OF 6 INCH POLY ALONG CALDWELLS LANE AND RUSSELL STREET IN PFLUGERVILLE, TRAVIS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PFLUGERVILLE SYSTEM INTEGRITY DECEMBER 4774 080.74693 289,318 INSTALL 1,739 FEET OF 4 INCH POLY ALONG THE ALLEY OF GOULD AVENUE AND DENVER AVENUE AND ABANDON 1,341 FEET OF 4 INCH, 451 FEET OF 6 INCH STEEL IN ACCORANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4775 080.74694 4,995 REPLACE (126) STEEL SERVICE LINES WITH POLY SERVICE LINES IN BRYAN IN ACCORDANCE WITH RAILROAD COMMISION RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER 4776 080.74695 148,814 INSTALL 2950 FEET OF 2 INCH AND 2022 FEET OF 4 INCH POLY ALONG THE STREETS OF HONEY CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH JULY 4777 080.74696 198,386 INSTALL 1890 FEET OF 4 INCH AND 4690 FEET OF 2 INCH POLY ALONG THE STREETS OF LETARA SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HASLET GROWTH DECEMBER 4778 080.74701 160 INSTALL 100 FEET OF 2 INCH POLY ALONG MERVINS RUN. RESIDENTIAL BRYAN GROWTH APRIL 4779 080.74702 412,436 INSTALL 2,970 FEET OF 2 INCH, 1,425 FEET OF 4 INCH AND 1,080 FEET OF 6 INCH POLY ALONG THE STREETS OF AVALON. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARGYLE GROWTH OCTOBER 4780 080.74703 931,347 INSTALL 2,800 FEET OF 8 INCH AND 30 FEET OF 4 INCH POLY AND ABANDON 2,690 FEET OF 8 INCH, 30 FEET OF 4 INCH STEEL AND 85 FEET OF 8 INCH POLY ALONG CAMP WISDOM AND BLUEWOOD ROAD IN ACCORDANCE WITH RAILROAD COMMISISON OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4781 080.74704 100,720 INSTALL DISTRICT REGULATOR STATION #01 ALONG WEST WICHITA STREET AND COWAN STREET IN BOWIE AND ABANDON DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE SYSTEM INTEGRITY DECEMBER 4782 080.74705 100,368 INSTALL DISTRICT REGULATOR STATION #03 ALONG NORTH MILL STREET AND EAST NELSON STREET IN BOWIE AND ABANDON DISTRICT REGULATOR STATION #03 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE SYSTEM INTEGRITY SEPTEMBER 4783 080.74706 159,826 INSTALL DISTRICT REGULATOR STATAION #09 ALONG HIGHWAY 59 SOUTH AND US HIGHWAY 287 IN BOWIE AND ABANDON DISTRICT REGULATOR STATION #09 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE SYSTEM INTEGRITY DECEMBER 4784 080.74708 15,438 INSTALL 250 FEET OF 6 INCH POLY ALONG US 380 AND CYPRESS BEND PARKWAY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PRINCETON GROWTH DECEMBER 4785 080.74709 559,688 INSTALL 2,360 FEET OF 2 INCH AND 215 FEET OF 4 INCH POLY AND ABANDON 2,345 FEET OF 3 INCH, 215 FEET OF 4 INCH STEEL AND 15 FEET OF 3 INCH POLY ALONG THE ALLEY BETWEEN BLUEWOOD AND CLEARWOOD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4786 080.74710 6,499 RELOCATE FACILITIES. INSTALL 2150 FEET OF 6 INCH AND 20 FEET OF 4 INCH POLY ALONG WEST BAILEY BOSWELL ROAD AND ABANDON 1950 FEET OF 4 INCH STEEL, 100 FEET OF 4 INCH AND 70 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4787 080.74711 227,009 INSTALL 5,930 FEET OF 2 INCH ALONG STREETS OF TREES FARM SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DESOTO GROWTH SEPTEMBER 4788 080.74712 1,680 RELOCATE FACILITIES. INSTALL 30 FEET OF 4 INCH POLY AND ABANDON 30 FEET OF 3 INCH STEEL ALONG 5TH STREET TO ACCOMMODATE THE CITY OF ANNA STREET PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS ANNA RELOCATION OF FACILITIES OCTOBER 4789 080.74719 359,533 INSTALL 1,450 FEET OF 4 INCH, 30 FEET OF 2 INCH AND 10 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION #02 ALONG WEST AVENUE E AND ALLEY BETWEEN 5TH AND 7TH STREET IN MIDLOTHIAN AND ABANDON 365 FEET OF 4 INCH STEEL AND 535 FEET OF 4 INCH, 770 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #02 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY DECEMBER 4790 080.74722 7,362 INSTALL 590 FEET OF 4 INCH POLY ALONG THE STREETS OF COMMERICAL CUSTOMER EPIC CENTRAL DEVELOPMENT IN GRAND PRAIRIE, TX. COMMERCIAL OR INDUSTRIAL GRAND PRAIRIE GROWTH JUNE 4791 080.74726 1,177 RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY ALONG MEACHAM BOULEVARD AND ABANDON 400 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISISON OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY RELOCATION OF FACILITIES OCTOBER 4792 080.74728 210,634 INSTALL 3,170 FEET OF 2 INCH POLY ALONG THE STREETS OF TRADITION PHASE 3A SUBDIVISION. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER 4793 080.74729 280,486 INSTALL 2,680 FEET OF 2 INCH AND 1,635 FEET OF 6 INCH POLY ALONG THE STREETS OF TRADITION SUBDIVISION IN FORT WORTH. RESIDENTIAL FORT WORTH GROWTH DECEMBER 4794 080.74730 133,473 INSTALL 3,392 FEET OF 4 INCH POLY ALONG THE STREETS OF SIERRA VISTA SUBDIVISION IN FORT WORTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER MTX Additions Page 142 of 178 361 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4795 080.74732 71 INSTALL 100 FEET OF 2 INCH POLY ALONG SADDLEBACK LANE. RESIDENTIAL SOUTHLAKE GROWTH DECEMBER 4796 080.74734 12,340 INSTALL 1330 FEET OF 4 INCH POLY ALONG HALTOM ROAD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL HALTOM CITY GROWTH JUNE 4797 080.74739 507,463 INSTALL 1,175 FEET OF 4 INCH, 2,800 FEET OF 2 INCH POLY AND ABANDON 2,675 FEET OF 2 INCH STEEL ALONG SAMBROSA LANE IN ACCORDANCE WITH RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 4798 080.74746 (42,504) INSTALL 1,400 FEET OF 8 INCH POLY AND ABANDON 1,400 OF 4 INCH POLY ALONG CHALLENGER ROAD. ALL CUSTOMERS MIDLOTHIAN SYSTEM IMPROVEMENT AUGUST 4799 080.74747 365,793 INSTALL 2,214 FEET OF 2 INCH POLY ALONG CORSICANA STREET AND ABANDON 415 FEET OF STEEL, 708 FEET OF 3 INCH, 1,745 FEET OF 2 INCH STEEL AND 228 FEET OF 4 INCH, 84 FEET OF 3 INCH, 420 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY DECEMBER 4800 080.74749 45,306 INSTALL 3740 FEET OF 2 INCH POLY AND 620 FEET OF 4 INCH POLY ALONG GEORGE BOYCE ROAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MESQUITE GROWTH APRIL 4801 080.74750 46,243 INSTALL 12,090 WMR END POINTS TO COMMERCIAL METERS IN THE DALLAS METRO AREA. ALL CUSTOMERS DALLAS SYSTEM IMPROVEMENT DECEMBER 4802 080.74751 199,952 INSTALL 3,440 FEET OF 2 INCH POLY ALONG THE STREETS OF WOLF CREEK FARMS SUBDIVISION IN MELISSA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH OCTOBER 4803 080.74752 17,774 RELOCATE FACILITIES. INSTALL 280 FEET OF 4 INCH AND 405 FEET OF 2 INCH POLY AND ABANDON 405 FEET OF 2 INCH AND 280 FEET OF 4 INCH STEEL ALONG SHADOW LANE TO ACCOMODATE CITY OF IRVING STORM DRAIN PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES OCTOBER 4804 080.74753 590,943 INSTALL 3,250 FEET OF 2 INCH POLY AND ABANDON 178 FEET OF 6 INCH, 967 FEET OF 4 INCH STEEL, AND 66 FEET OF 4 INCH, 1,014 FEET OF 2 INCH POLY ALONG CORSICANA STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY DECEMBER 4805 080.74755 3,248 INSTALL 20 FEET OF 4 INCH POLY AND NEW DISTRICT REGULATOR STATION 08 AND ABANDON 25 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION 08 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER 4806 080.74756 130,368 INSTALL DISTRICT REGULATOR STATION #121, 57 FEET OF 2 INCH, 30 FEET OF 4 INC ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 4807 080.74757 443,811 INSTALL 1,310 FEET OF 4 INCH, 526 FEET OF 6 INCH POLY AND ABANDON 1,329 FEET OF 4 INCH STTEL, 488 FEET OF 6 INCH POLY ALONG THE ALLEY OF GOULD AVENUE AND DENVER AVENUE IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 4808 080.74759 314,027 INSTALL 2750 FEET OF 2 INCH POLY AND ABANDON 1440 FEET OF 2 INCH, 1200 FEET OF 3 INCH STEEL AND 30 FEET OF 2 INCH POLY ALONG THE STREETS OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4809 080.74762 (629) REPLACE 460 FEET OF 4 INCH POLY ALONG FAROLA DRIVE AND ABANDON 145 FEET OF 3 INCH STEEL. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES DECEMBER 4810 080.74765 7,073 REPLACE 100 STEEL SERVICE LINES WITH POLY SERVICE LINES ON MAPSHEET IN ACCORDANCE WITH RAILROAD COMMISION RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER 4811 080.74768 361,130 INSTALL 4000 FEET OF 8 INCH POLY ALONG THE STREETS OF CREEKSIDE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROYSE CITY GROWTH DECEMBER 4812 080.74769 215,507 INSTALL 4500 FEET OF 2 INCH AND 1230 FEET OF 4 INCH POLY ALONG THE STREETS OF CREEKSIDE SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH DECEMBER 4813 080.74771 1,605 RELOCATE FACILITIES. INSTALL 570 FEET OF 2 INCH POLY ALONG THE EASEMENT OF MILLER ROAD AND ABANDON 550 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF GARLAND STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER 4814 080.74772 1,320,158 INSTALL 12,780 FEET OF 2 INCH, 770 FEET OF 4 INCH AND 3,300 FEET OF 6 INCH POLY ALONG THE STREETS OF BRIDGEWATER SUBDIVISION IN MIDLOTHIAN, ELLIS COUNTY. RESIDENTIAL MIDLOTHIAN GROWTH DECEMBER 4815 080.74773 1,584,313 INSTALL 16 INCH PIG TRAP AT PLANO SOUTH STATION, INSTALL 500 FEET OF 4 INCH ON D17-4-10 AND INSTALL TWO (2) REGULATOR STATIONS AT SANDEN STATION IN WYLIE, COLLIN COUNTY. ALL CUSTOMERS WYLIE SYSTEM IMPROVEMENT DECEMBER 4816 080.74775 87,590 INSTALL DISTRICT REGULATOR STATION #126, 35 FEET OF 2 INCH AND 35 FEET OF 4 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 4817 080.74776 69,559 INSTALL 40 FEET OF 2 INCH AND 38 FEET OF 4 INCH POLY AND DISTRICT REGULATO ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 4818 080.74778 28,165 INSTALL 94 POLY SERVICES AND ABANDON 94 STEEL SERVICES IN WACO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 4819 080.74779 5,755 RELOCATE FACILITIES. INSTALL 1075 FEET OF 4 INCH POLY ALONG MARBLEHEAD DRIVE AND ABANDON 1050 FEET OF 6 INCH STEEL ITO ACCOMODATE CITY OF DALLAS N ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 4820 080.74780 97,351 INSTALL 30 FEET OF 2 INCH AND 40 FEET OF 4 INCH AND DISTRICT REGULATOR STA ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY JUNE 4821 080.74782 702,617 INSTALL 3,205 FEET OF 2 INCH POLY ALONG ROSEMARY AND GARFIELD IN DALLAS AND ABANDON 3,205 FEET OF 2I NCH STEE AND 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4822 080.74783 92,206 INSTALL 50 FEET OF 2 INCH AND 30 FEET OF 4 INCH POLY AND DISTRICT REGULATO ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER 4823 080.74785 253 RELOCATE FACILITIES. INSTALL 150 FEET OF 6 INCH POLY ALONG HEMPHILL STREET AND ABANDON 150 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH ROAD CONSTRUCTION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4824 080.74786 3,448 RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY AND ABANDON 490 FEET OF 2 INCH POLY ALONG RIDGE ROAD WEST TO ACCOMODATE CITY OF ROCKWALL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL RELOCATION OF FACILITIES OCTOBER 4825 080.74787 20,046 INSTALL 150 FEET OF 2 INCH POLY ALONG THE STREETS OF SOUTHLAKE. RESIDENTIAL SOUTHLAKE GROWTH DECEMBER 4826 080.74791 1,537 INSTALL 150 FEET OF 2 INCH POLY ALONG JUSTIN ROAD. ALL CUSTOMERS HIGHLAND VILLAGE GROWTH DECEMBER 4827 080.74794 973,604 INSTALL 2,640 FEET OF 2 INCH POLY ALONG GARFIELD ROAD AND PHINNEY IN DALLAS AND ABANDON 2,560 FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4828 080.74798 4,240 RELOCATE FACILITIES. INSTALL 535 FEET OF 6 INCH POLY AND ABANDON 535 FFET OF 6 INCH POLY ALONG SHIVER DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4829 080.74799 685,531 INSTALL 2,930 FEET OF 2 INCH POLY ALONG OGDEN AND HIGGINS IN DALLAS AND ABANDON 2,850 FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4830 080.74805 46,540 INSTALL 1740 FEET OF 4 INCH AND 590 FEET OF 2 INCH POLY AND ABANDON 1771 FEET OF 4 INCH, 255 FEET OF 2 INCH STEEL AND 180 FEET OF 2 INCH POLY ALONG THE STREETS OF SNYDER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER 4831 080.74806 84,505 STEEL AND POLY SQUEEZE REPLACEMENT AND INCREMENTAL TOOLS FOR USE THROUGHOUT THE DIVISION. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT FEBRUARY 4832 080.74807 13,499 RELOCATE FACILITIES. INSTALL 22 FEET OF 6 INCH POLY ALONG LAKEWOOD DRIVE AND ABANDON 20 FEET OF 6 INCH POLY TO ACCOMODATE DEVELOPER FACILITIES. ALL CUSTOMERS BURLESON RELOCATION OF FACILITIES MARCH 4833 080.74808 97,145 INSTALL 215 FEET OF 2 INCH POLY ALONG NORTH MAIN STREET AND ABANDON 215 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLUE RIDGE SYSTEM INTEGRITY DECEMBER 4834 080.74809 157,334 INSTALL 15 FEET OF 2 INCH AND 875 FEET OF 4 INCH POLY ALONG NORTH RIKE STR ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY DECEMBER 4835 080.74810 341,454 INSTALL 4,240 FEET OF 6 INCH, 120 FEET OF 4 INCH AND 1,750 FEET OF 2 INCH POLY ALONG THE STREETS OF SILO MILLS SUBDIVSION IN CLEBURNE, JOHNSON COUNTY. RESIDENTIAL CLEBURNE GROWTH DECEMBER 4836 080.74811 333,757 INSTALL 3,120 FEET OF 4 INCH AND 2,500 FEET OF 2 INCH POLY ALONG THE STREETS OF SILO MILLS SUBDIVISION IN CLEBURNE, JOHNSON COUNTY. RESIDENTIAL CLEBURNE GROWTH DECEMBER 4837 080.74822 377,254 RELOCATE FACILITIES. INSTALL 1.098 FEET OF 6 INCH POLY AND 140 FEET OF 10 INCH STEEL AND ABANDON 1,078 FEET OF 6 INCH POLY AND 205 FEET OF 8 INCH STEEL ALONG STATE HIGHWAY 66 AND DALROCK ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 143 of 178 362 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4838 080.74825 116,316 INSTALL 700 FEET OF 4 INCH POLY ALONG SPRINGLAKE PARKWAY AND ABANDON 790 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY JULY 4839 080.74830 64,527 INSTALL 30 FEET OF 2 INCH AND 30 FEET OF 4 INCH POLY AND DISTRICT REGULATO ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY JUNE 4840 080.74831 81,387 INSTALL DISTRICT STATION #23 AND 30 FEET OF 2 INCH, 30 FEET OF 4 INCH POLY IN ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY APRIL 4841 080.74834 1,480 INSTALL 100 FEET OF 2 INCH POLY ALONG CHISHOLM ROAD. RESIDENTIAL SAINT JO GROWTH MARCH 4842 080.74835 39,175 INSTALL 20 FEET OF 2 INCH AND&NBSP; DISTIRCT REGULATOR STATION #10 ALONG W ALL CUSTOMERS EASTLAND SYSTEM INTEGRITY OCTOBER 4843 080.74839 85,644 INSTALL 30 FEET OF 2 INCH AND 30 FEET OF 4 INCH POLY AND DISTRICT REGULATO ALL CUSTOMERS SANTA ANNA SYSTEM INTEGRITY DECEMBER 4844 080.74842 7,365 INSTALL 260 POLY SERVICE LINES AND ABANDON 260 STEEL SERVICE LINES IN CORSICANA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER 4845 080.74845 399,517 INSTALL 1,300 FEET OF 2 INCH, 1,250 FEET OF 4 INCH POLY ALONG WALBURN COURT AND ABANDON 2,610 FEET OF 2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JULY 4846 080.74847 388,642 INSTALL 2,390 FEET OF 2 INCH POLY ALONG NAVARRO STREET AND ABANDON 1,570 FEET OF 2 INCH, 730 FEET OF 4 INCH STEEL AND 60 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4847 080.74851 (648) INSTALL 300 FEET OF 2 INCH POLY ALONG EAST CEDAR STREET. RESIDENTIAL ECTOR GROWTH MARCH 4848 080.74854 313,557 INSTALL 1,815 FEET OF 2 INCH POLY ALONG BAYSIDE AND ABANDON 1,805 FEET OF 2 INCH STEEL AND 10 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JULY 4849 080.74861 638 RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH POLY AND ABANDON 350 FFET OF 2 INCH POLY ALONG COMMANDER ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4850 080.74863 4,015 INSTALL 900 FEET OF 2 INCH POLY ALONG STREETS OF GODLEY AND ABANDON 900 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GODLEY SYSTEM INTEGRITY OCTOBER 4851 080.74866 101,896 INSTALL DISTRICT REGULATOR STATION #04 AND 75 FEET OF 2 INCH AND 30 FEET O ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY OCTOBER 4852 080.74867 138,610 INSTALL 70 FEET OF 2 INCH, 300 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #05 ALONG WICHITA STREET AND ABANDON 30 FEET OF 4 INCH POLY 185 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY DECEMBER 4853 080.74868 96,137 ABANDON DISTRICT REGULATOR STATION DRS01, 534 FEET OF 4 INCH STEEL AND 764 FEET OF 4 INCH POLY ALONG EAST WICHITA STREET IN HENRIETTA, CLAY COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY DECEMBER 4854 080.74869 203,745 INSTALL DISTRICT REGULATOR STATION DRS08, 40 FEET OF 2 INCH AND 180 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS08 AND 20 FEET OF 2 INCH AND 45 FEET OF 6 INCH STEEL ALONG S RED RIVER STREET IN HENRIETTA, CLAY COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY DECEMBER 4855 080.74873 105,220 INSTALL DISTRICT REGULATOR STATION 026 AND 30 FEET OF 2 INCH, 30 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 026 AND 48 FEET OF 2 INCH, 63 FEET OF 4 INCH STEEL AND 8 FEET OF 4 INCH POLY ALONG 11TH STREET IN WICHITA FALLS, WICHITA COUNTY. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 4856 080.74874 90,653 INSTALL DISTRICT REGULATOR STATION #09 ALONG EASTON STREET AND GEORGIA STREET IN VERNON AND ABANDON DISTRICT REGULATOR STATION #09 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY DECEMBER 4857 080.74875 83,636 INSTALL DISTRICT REGULATOR STATION #10 ALONG BEAVER STREET AND MAIN STREET IN VERNON AND ABANDON DISTRICT REGULATOR STATION #10 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY DECEMBER 4858 080.74877 98,233 INSTALL DISTRICT REGULATOR STATION #22, 45 FEET OF 2 INCH, 30 FEET OF 4 INCH ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 4859 080.74879 153,631 INSTALL DISTRICT REGULATOR STATION #103, 70 FEET OF 2 INCH AND 540 FEET OF ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 4860 080.74880 25,787 RELOCATE FACILITIES. INSTALL 50 FEET OF 12 INCH POLY AND ABANDON 30 FEET OF 12 INCH STEEL ALONG LOVERS LANE TO ACCOMODATE CITY OF DALLAS STORM DRAIN PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 4861 080.74881 736,968 INSTALL 3,950 FEET OF 4 INCH AND 450 FEET OF 2 INCH POLY ALONG CANADA DRIVE AND ABANDON 3,790 FEET OF 4 INCH, 420 FEET OF 2 INCH STEEL, 40 FEET OF 4 INCH AND 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JULY 4862 080.74885 32,299 INSTALL 2,561 FEET OF 8 INCH, 3,094 FEET OF 4 INCH AND 10,416 FEET OF 2 INCH POLY ALONG THE STREETS OF TRAVISSO SUBDIVISION IN LEANDER, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER 4863 080.74887 31,727 INSTALL 960 FEET OF 2 INCH POLY ALONG SAYERS LANE. RESIDENTIAL NORTH RICHLAND HILLS GROWTH DECEMBER 4864 080.74888 308,017 INTEGRITY DIGS AND REMEDIATION ALONG LINE D IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4865 080.74889 10,576 RELOCATE FACILITIES. INSTALL 1,575 FEET OF 8 INCH POLY ALONG HIGHWAY 290 IN MANOR AND ABANDON 1,945 FEET OF 8 INCH POLY. ALL CUSTOMERS MANOR RELOCATION OF FACILITIES DECEMBER 4866 080.74890 65,148 INSTALL 920 FEET OF 6 INCH POLY ALONG THE STREET OF COMMERCIAL DEVELOPMENT IN WACO. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL WACO GROWTH DECEMBER 4867 080.74892 560 INSTALL 244 FEET OF 2 INCH POLY ALONG THE STREETS OF JOSHUA. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL JOSHUA GROWTH MARCH 4868 080.74893 307,002 INSTALL 1,540 FEET OF 2 INCH POLY ALONG PUGET STREET AND ABANDON 1,500 FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JULY 4869 080.74897 9,308 INSTALL 3010 FEET OF 6 INCH POLY AND ABANDON 7.3 MILES OF 10 INCH TO 18 INCH STEEL ALONG LINE B IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4870 080.74898 888,406 INSTALL 3,780 FEET OF 4 INCH AND 110 FEET OF 2 INCH POLY AND ABANDON 220 FE ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4871 080.74906 97,691 RELOCATE FACILITIES. INSTALL 1738 FEET OF 4 INCH AND 262 FEET OF 2 INCH POLY ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES OCTOBER 4872 080.74909 542,442 INSTALL 2,500 FEET OF 2 INCH, 1,375 FEET OF 4 INCH POLY ALONG TITUS STREET AND ABANDON 375 FEET OF 4 INCH POLY AND 3,500 FEET OF 6 INCH STEEL AND DISTRICT REGULATOR STATION #28 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE 4873 080.74913 210 RELOCATE FACILITIES. INSTALL 20 FEET OF 4 INCH POLY ALONG PUTNAM DRIVE AND ABANDON 6 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE RELOCATION OF FACILITIES OCTOBER 4874 080.74915 171 INSTALL 275 FEET OF 2 INCH POLY ALONG BRYAN ROAD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL BRYAN GROWTH MARCH 4875 080.74917 54,030 INSTALL 1340 FEET OF 2 INCH POLY ALONG THE STREETS OF TRINITY FALLS DEVELOPMENT. RESIDENTIAL MCKINNEY GROWTH APRIL 4876 080.74918 66,803 INSTALL 1650 FEET OF 2 INCH POLY ALONG THE STREETS OF TALON HILL SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER 4877 080.74922 171,971 INSTALL 2305 FEET OF 4 INCH POLY AND 1470 FEET OF 2 INCH POLY ALONG THE STREETS IF KELLER SPRINGS DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER 4878 080.74924 199,728 INSTALL 225 FEET OF 2 INCH POLY ALONG AINSWORTH AND ABANDON 245 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4879 080.74925 670,630 INSTALL 2,792 FEET OF 2 INCH POLY ALONG ERATH STREET AND NORTH 44TH STREET IN WACO AND ABANDON 2,562 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 4880 080.74927 33,384 INSTALL 1100 FEET OF 6 INCH POLY ALONG US 380 AND ABANDON 245 FEET OF 2 INCH STEEL AND 725 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY DECEMBER 4881 080.74930 141,739 RELOCATE FACILITIES. INSTALL 150 FEET OF 8 INCH AND 150 FEET OF 8 INCH POLY ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 4882 080.74931 75,779 RELOCATE FACILITIES. INSTALL 150 FEET OF 6 INCH POLY AND ABANDON 60 FEET OF 6 INCH POLY ALONG STREETS OF MANSFIELD TO ACCOMODATE CITY OF MANSFIELD STREETS PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD RELOCATION OF FACILITIES OCTOBER MTX Additions Page 144 of 178 363 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4883 080.74934 3,557 INSTALL A HALF SOLE ALONG LINE DT3 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4884 080.74935 22,636 INSTALL 1,185 FEET OF 2 INCH POLY ALONG THE STREETS OF PATRIOT PLACE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WICHITA FALLS GROWTH SEPTEMBER 4885 080.74937 28,209 INSTALL 2950 FEET OF 8 INCH POLY ALONG STREETS OF BALCH SPRINGS AND ABANDON 2953 FEET OF 8 INCH STEEL AND 10 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALCH SPRINGS SYSTEM INTEGRITY OCTOBER 4886 080.74941 355,320 INSTALL 1500 FEET OF 8 INCH POLY ALONG WEATHERFORD ROAD. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH SEPTEMBER 4887 080.74943 108,728 INSTALL 2955 FEET OF 2 INCH AND 1565 FEET OF 4 INCH POLY ALONG THE STREETS OF ARIA TOWNHOMES. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SACHSE GROWTH SEPTEMBER 4888 080.74945 45,368 INSTALL 5400 FEET OF 2 INCH POLY ALONG THE STREETS OF KENSINGTON PLACE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CARROLLTON GROWTH OCTOBER 4889 080.74946 877 INSTALL 100 FEET OF 4 INCH POLY ALONG EAST MAIN STREET. COMMERCIAL OR INDUSTRIAL EASTLAND GROWTH JUNE 4890 080.74949 14,573 INSTALL 4,380 FEET OF 2 INCH POLY ALONG STREETS OF SUMMIT PARKS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DESOTO GROWTH OCTOBER 4891 080.74950 11,548 INSTALL 55 POLY SERVICE LINES AND ABANDON 55 STEEL SERVICE LINES IN BRYAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALDWELL SYSTEM INTEGRITY OCTOBER 4892 080.74954 5,390 INSTALL 290 FEET OF 4 INCH POLY ALONG THE STREET OF DISTRIBUTION DRIVE. DEVELOPER INSTALLED FACILIITES. COMMERCIAL OR INDUSTRIAL WILMER GROWTH JUNE 4893 080.74955 145,296 INSTALL 3,640 FEET OF 2 INCH POLY ALONG STREETS OF MAPLEWOOD PHASE 2 SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GLENN HEIGHTS GROWTH SEPTEMBER 4894 080.74956 (11,552) RELOCATE FACILITIES. INSTALL 250 FEET OF 6 INCH STEEL AND ABANDON 250 FEET OF 6 INCH STEEL ALONG INTERSECTION OF TEXAS AVE AND FM 2818 TO ACCOMODATE NEW BUILDING. ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES SEPTEMBER 4895 080.74958 212,629 INSTALL 100 FEET OF 8 INCH STEEL ALONG WILLIAMS DRIVE IN GEORGETOWN AND ABANDON 100 FEET OF 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY DECEMBER 4896 080.74960 275,924 INSTALL 1,200 FEET OF 8 INCH, 1,800 FEET OF 4 INCH, AND 700 FEET OF 2 INCH POLY ALONG THE STREETS OF HARVEST SUBDIVISION IN NORTHLAKE. RESIDENTIAL NORTHLAKE GROWTH DECEMBER 4897 080.74961 167,525 INSTALL 2,600 FEET OF 2 INCH POLY ALONG THE STREETS OF HARVEST SUBDIVSION IN NORTHLAKE. RESIDENTIAL NORTHLAKE GROWTH DECEMBER 4898 080.74962 2,957 INSTALL 175 FEET OF 4 INCH POLY ALONG MARSHAL DRIVE. COMMERCIAL OR INDUSTRIAL GRAND PRAIRIE GROWTH MARCH 4899 080.74965 1,778 INSTALL 300 FEET OF 2 INCH POLY ALONG BOB HANGAR ROAD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH APRIL 4900 080.74966 674,439 INSTALL 3,375 FEET OF 6 INCH, 540 FEET OF 4 INCH AND 9.780 FEET OF 2 INCH POLY ALONG STREETS OF DOVE HOLLOW PHASE 1 SUBDIVISION. RESIDENTIAL WAXAHACHIE GROWTH SEPTEMBER 4901 080.74968 20,479 INSTALL 1,500 FEET OF 4 INCH POLY ALONG 14TH STREET AND HAWKINS RUN IN MIDLOTHIAN. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL MIDLOTHIAN GROWTH DECEMBER 4902 080.74969 60,543 INSTALL 3,000 FEET OF 2 INCH POLY ALONG THE STREETS OF SOUTHERN POINTE SUBDIVISION IN COLLEGE STATION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH SEPTEMBER 4903 080.74970 69,185 INSTALL 2,075 FEET OF 2 INCH POLY ALONG FM 2818. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL BRYAN GROWTH OCTOBER 4904 080.74979 (5,710) RELOCATE FACILITIES. INSTALL 150 FEET OF 6 INCH POLY ALONG WESTPORT PARKWAY AND ABANDON 150 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES MAY 4905 080.74980 97,166 INSTALL 450 FEET OF 6 INCH POLY ALONG CHERRY AND ABANDON 450 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY APRIL 4906 080.74981 595,329 INSTALL 3,740 FEET OF 2 INCH POLY AND ABANDON 3,295 FEET OF 3 INCH AND 55 FEET OF 6 INCH STEEL NEAR THE INTERSECTION OF CHANNEL AND BROCKBANK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4907 080.74982 119,527 INSTALL 2,635 FEET OF 2 INCH POLY ALONG TRAIL CREEK SUBDIVISION IN JOSHUA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CLEBURNE GROWTH DECEMBER 4908 080.74983 535,165 INSTALL 1,500 FEET OF 2 INCH POLY AND ABANDON 1,500 FEET OF 2 INCH STEEL ALONG THE STREETS OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4909 080.74984 331,843 INSTALL 2,670 FEET OF 2 INCH POLY AND ABANDON 2,240 FEET OF 2 INCH, 165 FEET OF 4 INCH, AND 10 FEET OF 8 INCH STEEL AND 165 FEET OF 4 INCH POLY ALONG WEBBS CHAPPLE IN ACCORDANCE WITH THE RAILROAD COMMISSON OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4910 080.74985 130,053 INSTALL DISTRICT REGULATOR STATION #01 ALVORD STREET AND EAST CURTIS STREET IN QUANAH AND ABANDON DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY SEPTEMBER 4911 080.74986 24,408 RELOCATE FACILITIES. INSTALL 550 FEET OF 4 INCH POLY AND ABANDON 550 FT OF 3 IN STEEL TO ACCOMODATE CITY OF DALLAS STREETS PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 4912 080.74988 118,863 RELOCATE FACILITIES. INSTALL 22 .75 INCH POLY SERVICE LINES ALONG ALAMO ST ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY DECEMBER 4913 080.74990 3,859 RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH POLY ALONG MEADOWCREEK AND ABANDON 110 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES OCTOBER 4914 080.74991 21,780 INSTALL 3,600 FEET OF 4 INCH AND 300 FEET OF 2 INCH POLY ALONG VALLEY RIDGE ROAD IN LEWISVILLE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL LEWISVILLE GROWTH JULY 4915 080.74993 791,289 INSTALL 3,990 FEET OF 2 INCH POLY ALONG BELKNOLL AND SEYMOUR IN DALLAS AND ABANDON 90 FEET OF 2 INCH POLY AND 3,675 FEET OF 3 INCH AND 230 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4916 080.74996 483,299 INSTALL 2,400 FEET OF 2 INCH POLY AND ABANDON 278 FEET OF 2 INCH, 589 FEET OF 3 INCH STEEL AND 161 FEET OF 2 INCH, 1,355 FEET OF 4 INCH POLY ALONG SUNSET, ANNA AND BOLIVAR STREET IN ACCORDANCE TO THE TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER 4917 080.75001 7 INSTALL 89 FEET OF 4 INCH POLY ALONG SOUTH MAIN. RESIDENTIAL JOSHUA GROWTH MARCH 4918 080.75012 642 INSTALL 4 INCH SERVICE LINE ALONG THE STREETS OF WALMART IN SWEETWATER. COMMERCIAL OR INDUSTRIAL SWEETWATER GROWTH JULY 4919 080.75015 415,366 INSTALL 3,635 FEET OF 4 INCH AND 5,945 FEET OF 2 INCH POLY ALONG STREETS OF THE OAKS AT NORTHGROVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WAXAHACHIE GROWTH SEPTEMBER 4920 080.75017 12,916 INSTALL 1,000 FEET OF 2 INCH POLY ALONG THE STREETS OF STONEBRIER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH JUNE 4921 080.75018 47,131 INSTALL 2,060 FEET OF 2 INCH POLY ALONG THE STREETS OF SOUTHERN POINTE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH JULY 4922 080.75021 1,608 INSTALL 600 FEET OF 4 INCH POLY ALONG PLANO PARKWAY IN PLANO. COMMERCIAL OR INDUSTRIAL PLANO GROWTH SEPTEMBER 4923 080.75023 31,675 INSTALL 100 FEET OF 4 INCH POLY ALONG SOUTH MULBERRY STREET. COMMERCIAL OR INDUSTRIAL ENNIS GROWTH SEPTEMBER 4924 080.75025 349,343 INSTALL 2,750 FEET OF 2 INCH POLY AND ABANDON 2,700 FEET OF 2 INCH STEEL ALONG RADSTOCK STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 4925 080.75029 927 RELOCATE FACILITIES. INSTALL 990 FEET OF 2 INCH POLY ALONG GLENDORA AND ABANDON 990 FEET OF 2 INCH STEEL TO ACCOMODATE CITY OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 4926 080.75032 465,097 INSTALL 2,600 FEET OF 4 INCH ALONG WRIGLEY WAY IN FORT WORTH AND ABANDON 2,500 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 4927 080.75033 (34) INSTALL DOCKING EQUIPMENT FOR KENWORTH AND F550 IN GROESBECK. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT MARCH 4928 080.75041 1,638 INSTALL 465 FEET OF 4 INCH POLY AND ABANDON 425 FEET OF 4 INCH STEEL ALONG STREETS OF CLEBURNE. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY DECEMBER 4929 080.75043 103,751 INSTALL 4272 FEET OF 2 INCH POLY ALONG THE STREETS OF HONEY CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH JUNE MTX Additions Page 145 of 178 364 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4930 080.75045 34,517 INSTALL 600 FEET OF 2 INCH POLY ALONG JEFFERSON. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS GRAND PRAIRIE GROWTH OCTOBER 4931 080.75047 11,923 INSTALL 1000 FEET OF 2 INCH AND 1200 FEET OF 4 INCH POLY ALONG PLANTERS ROAD. DEVELOPER INSTALLED FACILTIES. COMMERCIAL OR INDUSTRIAL SUNNYVALE GROWTH JUNE 4932 080.75048 483,110 INSTALL 1,293 FEET OF 4 INCH, 500 FEET OF 6 INCH POLY ALONG DENVER AVE AND ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 4933 080.75049 480 INSTALL 1100 FEET OF 6 INCH POLY ALONG THE STREETS OF ABILENE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL ABILENE GROWTH SEPTEMBER 4934 080.75052 21,019 INSTALL 620 FEET OF 2 INCH AND 1,680 FEET OF 4 INCH POLY ALONG THE STREETS OF ABES LANDING SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GRANBURY GROWTH JULY 4935 080.75053 58,495 INSTALL 1400 FEET OF 10 INCH STEEL AND ABANDON 1400 FEET OF 10 INCH STEEL ALONG TERMINAL C OF DALLAS FORT WORTH AIRPORT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER 4936 080.75054 1,688 INSTALL 700 FEET OF 4 INCH POLY ALONG CYPRESS AND ABANDON 700 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY OCTOBER 4937 080.75058 1,089,138 INSTALL 3,120 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY ALONG RUSTOWN AND ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4938 080.75059 566,260 INSTALL 2,400 FEET OF 2 INCH POLY AND ABANDON 2,390 FEET OF 3 INCH STEEL ALONG THE STREETS OF RUSTOWN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4939 080.75060 17,940 INSTALL 575 FEET OF 4 INCH POLY ALONG THE STREET OF WAINWRIGHT WAY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS CARROLLTON GROWTH DECEMBER 4940 080.75064 (3,382) INSTALL 100 FEET OF 2 INCH POLY ALONG WEST PARNELL STREET. RESIDENTIAL DENISON GROWTH APRIL 4941 080.75066 807 RELOCATE FACILITIES. INSTALL 131 FEET OF 2 INCH POLY ALONG WESTBOROUGH LANE AND ABANDON 125 FEET OF 2 INCH POLY TO ACCOMODATE DEVELOPER FACILITIES. ALL CUSTOMERS LEANDER RELOCATION OF FACILITIES JUNE 4942 080.75068 399,925 INSTALL 1,650 FEET OF 2 INCH POLY ALONG WHITMAN AVENUE IN FORT WORTH AND ABANDON 1,600 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 4943 080.75069 340,802 INSTALL 2,025 FEET OF 2 INCH, 315 FEET OF 4 INCH POLY ALONG NORTH LUMPKIN STREET WITHIN THE CITY OF MART AND ABANDON 10 FEET OF 4 INCH, 15 FEET OF 3 INCH POLY AND 950 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS MART SYSTEM INTEGRITY JUNE 4944 080.75071 327,659 INSTALL 360 FEET OF 4 INCH, 1,750 FEET OF 2 INCH POLY AND ABANDON 1,370 FEET OF 3 INCH STEEL AND 420 FEET OF 4 INCH POLY ALONG MCLLENAN AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY DECEMBER 4945 080.75072 1,054,586 INSTALL 2,495 FEET OF 2 INCH AND 700 FEET OF 4 INCH POLY NEAR THE INTERSECTION OF GROSS AND PIPER AND ABANDON 820 FEET OF 6 INCH AND 3,000 FEET OF 3 INCH STEEL AND 30 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4946 080.75073 341,078 INSTALL 2,127 FEET OF 4 INCH POLY AND ABANDON 2,138 FEET OF 3 INCH, 20 FEET OF 4 INCH POLY ALONG TEXAS AVENUE AND NORTH COUNTY LINE ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY DECEMBER 4947 080.75074 726,749 INSTALL 20 FEET OF 2 INCH AND 3,310 FEET OF 4 INCH POLY NEAR THE INTERSECTI ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4948 080.75076 16,086 INSTALL 250 FEET OF 2 INCH POLY ALONG EDEN TAP ROAD. RESIDENTIAL KENNEDALE GROWTH DECEMBER 4949 080.75077 122,437 INSTALL DISTRICT REGULATOR STATION #22 AND 165 FEET OF 4 INCH STEEL ALONG 4TH STREET AND FORREST AVENUE AND ABANDON DISTRICT REGULATOR STATION #22 AND 160 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER 4950 080.75078 636,411 INSTALL 10 FEET OF 4 INCH AND 620 FEET OF 6 INCH POLY ALONG GOODWIN AND ABANDON 600 FEET OF 10 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4951 080.75082 659 RELOCATE FACILITIES. INSTALL 280 FEET OF 4 INCH POLY AND ABANDON 250 FEET OF 4 INCH STEEL ALONG SOUTH 9TH STREET TO ACCOMODATE CITY OF FORT WORTH STORM SEWER PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO RELOCATION OF FACILITIES OCTOBER 4952 080.75083 672,436 RELOCATE FACILITIES. INSTALL 3,600 FEET OF 2 INCH, 450 FEET OF 4 INCH POLY AND ABANDON 3,600 FEET OF 2 INCH AND 450 FEET OF 4 INCH POLY ALONG ELMCREST AND LARRAINE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY DECEMBER 4953 080.75084 2,378,662 INSTALL 4 MILES OF 6 INCH STEEL FROM P(2ND)/L26 JUNCTION TO LOTT DISTRICT REGULATOR STATION SOUTH OF HWY 320 AND ABANDON 4 MILES OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LOTT SYSTEM INTEGRITY DECEMBER 4954 080.75089 51,988 INSTALL 4,221 FEET OF 2 INCH POLY ALONG THE STREETS OF WILLIAMS CREEK RESERVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH SEPTEMBER 4955 080.75090 3,036 RELOCATE FACILITIES. INSTALL 42 FEET OF 6 INCH POLY AND ABANDON 30 FEET OF 6 INCH POLY ALONG HIGHWOOD TRAIL TO ACCOMODATE CITY OF FORT WORTH STORM SEWER PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES OCTOBER 4956 080.75091 323,903 INSTALL 2,000 FEET OF 4 INCH, 450 FEET OF 2 INCH POLY ALONG WEST HOPKINGS STREET AND ABANDON 2,550 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY DECEMBER 4957 080.75094 26 INSTALL 28 FEET OF 2 INCH POLY AND ABANDON 28 FEET OF 2 INCH POLY ALONG HIGHWAY 224. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY JUNE 4958 080.75097 3,850 RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH AND 115 FEET OF 2 INCH POLY AND ABANDON 50 FEET OF 6 INCH AND 115 FEET OF 2 INCH POLY ALONG TITTLE DRIVE TO ACCOMODATE CITY OF LEWISVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE RELOCATION OF FACILITIES OCTOBER 4959 080.75098 12,410 RELOCATE FACILITIES. INSTALL 120 FEET OF 4 INCH POLY AND ABANDON 120 FEET OF 4 INCH POLY ALONG KARNES STREET TO ACCOMODATE CITY OF FLOWERMOUND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND RELOCATION OF FACILITIES OCTOBER 4960 080.75102 45,684 INSTALL 400 FEET OF 2 INCH POLY ALONG RIDGEVIEW ROAD. RESIDENTIAL SHERMAN GROWTH APRIL 4961 080.75108 9,725 INSTALL 80 FEET OF 2 INCH POLY ALONG THE STREET OF NORTH SHORE DRIVE. COMMERCIAL OR INDUSTRIAL BRYAN GROWTH JUNE 4962 080.75110 3,958 INSTALL 600 FEET OF 2 INCH POLY ALONG THE STREETS OF MEANDERING WAY SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FAIRVIEW GROWTH APRIL 4963 080.75112 10,413 INSTALL 275 FEET OF 2 INCH POLY AND ABANDON 358 FEET OF 10 INCH STEEL ALONG 10TH STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 4964 080.75115 111,654 INSTALL 75 FEET OF 4 INCH POLY ALONG HORNE STREET, 450 FEET OF 2 INCH POLY ALONG CARVER DRIVE AND ABANDON 450 FEET OF 3 INCH STEEL AND 30 FEET OF 4 INCH POLY DUE TO CITY CONFLICT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE 4965 080.75124 264,425 RELOCATE FACILITIES. INSTALL 1,180 FEET OF 2 INCH POLY ALONG CHERRY STREE ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY DECEMBER 4966 080.75129 7,454 INSTALL 980 FEET OF 2 INCH POLY ALONG THE STREET OF TALBERT DRIVE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL PLANO GROWTH SEPTEMBER 4967 080.75130 32,720 INSTALL 600 FEET OF 2 INCH POLY ALONG THE STREETS OF BANDIT TRAIL SUBDIVISION. RESIDENTIAL KELLER GROWTH SEPTEMBER 4968 080.75132 1,744 RELOCATE FACILITIES. INSTALL 300 FEET OF 6 INCH POLY ALONG MAIN STREET AND ABANDON 300 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF CROWLEY STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY RELOCATION OF FACILITIES OCTOBER 4969 080.75133 455,851 INSTALL 1,121 FEET OF 2 INCH, 930 FEET OF 4 INCH POLY AND ABANDON 280 FEET O ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY DECEMBER 4970 080.75146 756,942 INSTALL 3,520 FEET OF 2 INCH POLY ALONG HEALEY DRIVE ALLEY AND ABANDON 1,950 FEET OF 3 INCH, 1,560 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 4971 080.75147 918,671 INSTALL 2,960 FEET OF 2 INCH POLY AND ABANDON 2,860 FEET OF 3 INCH STEEL, 100 FEET OF 4 INCH POLY ALONG HILLGLENN ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4972 080.75149 3,532 RELOCATE FACILITIES. INSTALL 600 FEET OF 6 INCH POLY ALONG SH 121 AND ABANDON 600 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF LEWISVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE RELOCATION OF FACILITIES OCTOBER MTX Additions Page 146 of 178 365 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 4973 080.75152 63,612 INSTALL 350 FEET OF 2 INCH POLY ALONG KNOLL TRAIL IN DALLAS AND ABANDON 700 FEET OF 2 INCH POLY. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4974 080.75158 13,541 INSTALL 1,160 FEET OF 4 INCH AND 130 FEET OF 8 INCH STEEL CASING ALONG THE STREET OF FM 731. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL BURLESON GROWTH SEPTEMBER 4975 080.75159 748,236 INSTALL 3,630 FEET OF 2 INCH POLY ALONG MILMAR DRIVE ALLEY AND ABANDON 3,530 FEET OF 3 INCH STEEL AND 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 4976 080.75160 317,742 INSTALL 1,350 FEET OF 2 INCH POLY ALONG MARLIN DRIVE ALLEY AND ABANDON 1,350 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JUNE 4977 080.75161 1,090,686 INSTALL 4,260 FEET OF 2 INCH POLY AND ABANDON 3,050 FEET OF 6 INCH, 1,210 FEET OF 3 INCH STEEL ALONG CRET RIDGE DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 4978 080.75162 266,058 INSTALL 200 FEET OF 4 INCH POLY AND ABANDON 130 FEET OF 4 INCH POLY ALONG THE STREETS OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JULY 4979 080.75164 181,509 INSTALL 1,320 FEET OF 4 INCH, 916 FEET OF 2 INCH POLY ALONG THE STREETS OF OMEGA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER 4980 080.75165 215,398 INSTALL 2282 FEET OF 4 INCH AND 787 FEET OF 2 INCH POLY ALONG THE STREETS OF OMEGA RANCH SUBDIVISION. RESIDENTIAL GEORGETOWN GROWTH JUNE 4981 080.75170 28,682 INSTALL DISTRICT REGULATOR STATION #301 AND 5 FEET OF 2 INCH, 5 FEET OF 4 IN ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE 4982 080.75171 97,086 INSTALL DISTRICT REGULATOR STATION #307 , 5 FEET OF 2INCH POLY, 5 FEET OF 4 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JULY 4983 080.75174 85,651 INSTALL DISTRICT REGULATOR STATION #403, 5 FEET OF 2 INCH, 5 FEET OF 4 INCH POLY ALONG PUTNAM STREET AND ABANDON DISTRICT REGULATOR STATION #403, 5 FEET OF 4 INCH, 5 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE 4984 080.75175 5,743 INSTALL DISTRICT REGULATOR STATION #405 AND ABANDON DISTRICT REGULATOR STATION #405 AT THE INTERSECTION OF CAMILLIA AND PARKDALE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY APRIL 4985 080.75184 308,755 INSTALL 1,575 FEET OF 2 INCH AND 375 FEET OF 4 INCH POLY ALONG WACO WAY IN FORT WORTH AND ABANDON 1,950 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 4986 080.75186 20,390 INSTALL 235 FEET OF 2 INCH POLY ALONG WOLF RANCH PARKWAY IN GEORGETOWN, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL GEORGETOWN GROWTH DECEMBER 4987 080.75188 284,743 INSTALL 2,500 FEET OF 2 INCH POLY AND ABANDON 2,450 FEET OF 2 INCH STEEL ALONG MARTIN LUTHER KING SOUTH. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER 4988 080.75190 231,552 INSTALL 1,100 FEET OF 2 INCH POLY AND ABANDON 850 FEET OF 4 INCH STEEL AND 25 FEET OF 4 INCH POLY ALONG THE ALLEY EAST OF BROOK TP SPEEDWAY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 4989 080.75195 13,081 INSTALL DISTRICT REGULATOR STATION #138, 28 FEET OF 2 INCH, 30 FEET OF 4 INC ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 4990 080.75196 63,073 INSTALL DISTRICT REGULATOR STATION #139 AND 45 FEET OF 2 INCH, 40 FEET OF 4 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 4991 080.75198 147,319 INSTALL DISTRICT REGULATOR STATION #140 AND 30 FEET OF 2 INCH, 20 FEET OF 4 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 4992 080.75199 110,817 INSTALL DISTRICT REGULATOR STATION #144 AND 20 FEET OF 2 INCH, 30 FEET OF 4 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 4993 080.75200 95,476 INSTALL DISTRICT REGULATOR STATION #02 IN THE ALLEY BETWEEN AVENUE A AND AVENUE B IN ROSEBUD AND ABANDON DISTRICT REGULATOR STATION #02 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSEBUD SYSTEM INTEGRITY SEPTEMBER 4994 080.75202 56,635 ABANDON DISTRICT REGULATOR STATION #03 ALONG EAST MAIN STREET IN ROSEBUD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSEBUD SYSTEM INTEGRITY SEPTEMBER 4995 080.75203 63,154 INSTALL DISTRICT REGULATOR STATION #01, 40 FEET OF 4 INCH POLY AT THE INTER ALL CUSTOMERS KEENE SYSTEM INTEGRITY SEPTEMBER 4996 080.75204 118,367 INSTALL 2,225 FEET OF 2 INCH, 600 FEET OF 4 INCH POLY ALONG THE STREETS OF HIGHBRIDGE BOULEVARD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH SEPTEMBER 4997 080.75208 2,930 INSTALL 1510 FEET OF 4 INCH POLY AND 1440 FEET OF 2 INCH POLY ALONG THE STREETS OF RIDGEVIEW FARMS DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH APRIL 4998 080.75210 62,643 INSTALL DISTRICT REGULATOR STATION #05 AND 20 FEET OF 2 INCH AND 20 FEET O ALL CUSTOMERS KEENE SYSTEM INTEGRITY SEPTEMBER 4999 080.75211 73,092 INSTALL DISTRICT REGULATOR STATION #502 AND 5 FEET OF 2 INCH AND 5 FEET OF ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5000 080.75213 343,980 INSTALL 3,200 FEET OF 4 INCH POLY ALONG THE STREETS OF MERCER CROSSING DEVELOPMENT IN DALLAS. COMMERCIAL OR INDUSTRIAL DALLAS GROWTH DECEMBER 5001 080.75214 116,827 INSTALL DISTRICT REGULATOR STATION #504 AND 5 FEET OF 2 INCH AND 5 FEET OF ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE 5002 080.75215 79,798 INSTALL DISTRICT REGULATOR STATION #505 AND 5 FEET OF 2 INCH AND 5 FEET OF ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE 5003 080.75216 63,189 INSTALL DISTRICT REGULATOR STATION #06 AND 40 FEET OF 4 INCH STEEL AT THE ALL CUSTOMERS KEENE SYSTEM INTEGRITY DECEMBER 5004 080.75217 29,997 INSTALL 4 COUPON TEST STATION ON LINE P2 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PFLUGERVILLE SYSTEM INTEGRITY MARCH 5005 080.75219 418,509 INSTALL 1,350 FEET OF 2 INCH POLY ALONG THE STREETS OF BRIDWELL AT 23RD STREET AND ABANDON 1,484 FEET OF 2 INCH STEEL AND 129 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 5006 080.75221 62,130 INSTALL DISTRICT REGULATOR STATION #01 AND 20 FEET OF 2 INCH, 20 FEET OF 4 ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY SEPTEMBER 5007 080.75222 74,113 INSTALL 4,510 FEET OF 2 INCH POLY ALONG THE STREETS OF SABLE CREEK SUBDIVISION. DEVELOPER INSTALLED FACILTIES. RESIDENTIAL SANGER GROWTH JUNE 5008 080.75225 100,609 INSTALL 2,930 FEET OF 2 INCH AND 3,150 FEET OF 4 INCH POLY ALONG THE STREETS OF ELM CREEK SUBDIVISION IN ABILENE. DEVELOPER INSTALLED FACILIITES. RESIDENTIAL ABILENE GROWTH DECEMBER 5009 080.75227 79,612 INSTALL DISTRICT REGULATOR STATION #314 AND 20 FEET OF 2 INCH, 60 FEET OF 4 ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY SEPTEMBER 5010 080.75228 1,026,703 RELOCATE FACILITIES. INSTALL 1,650 FEET OF 12 INCH AND 140 FEET OF 12 INCH A ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5011 080.75229 222,447 INSTALL 1,325 FEET OF 6 INCH POLY ALONG BAYWATER DRIVE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL PLANO GROWTH SEPTEMBER 5012 080.75233 290,967 INSTALL 3,803 FEET OF 2 INCH AND 2,858 FEET OF 4 INCH POLY ALONG THE STREETS OF MAYFAIR SOUTH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CROWLEY GROWTH DECEMBER 5013 080.75236 128,180 INSTALL DISTRICT REGULATOR STATION #01, 40 FEET OF 2 INCH, 40 FEET OF 4 INCH ALL CUSTOMERS ITALY SYSTEM INTEGRITY OCTOBER 5014 080.75239 101,747 INSTALL DISTRICT REGULATOR STATION #509 AND 20 FEET OF 4 INCH, 20 FEET OF 2 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 5015 080.75243 119,376 INSTALL DISTRICT REGULATOR STATION #521 AND 20 FEET OF 2 INCH, 20 FEET OF 6 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5016 080.75248 17,656 INSTALL 100 FEET OF 2 INCH POLY ALONG FM 3060. RESIDENTIAL MIDWAY GROWTH JULY 5017 080.75251 70,915 INSTALL DISTRICT REGULATOR STATION #02 AND 40 FEET OF 2 INCH, 40 FEET OF 4 ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY JUNE 5018 080.75254 42,742 INSTALL 760 FEET OF 2 INCH POLY ALONG THE STREETS OF ENCLAVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SAN ANGELO GROWTH SEPTEMBER 5019 080.75256 104,005 INSTALL DISTRICT REGULATOR STATION #05 AND 40 FEET OF 2 INCH, 40 FEET OF 4 ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY JUNE 5020 080.75259 1,012,705 INSTALL 1,965 FEET OF 4 INCH, 2,300 FEET OF 2 INCH POLY NEAR THE INTERSECTIO ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5021 080.75260 80,041 INSTALL 150 FEET OF 2 INCH POLY AND ABANDON 150 FEET OF 2 INCH STEEL ALONG MCCURDY STREET AND ABANDON 150 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY SYSTEM INTEGRITY SEPTEMBER 5022 080.75261 1,146,696 INSTALL 640 FEET OF 4 INCH, 3,695 FEET OF 2 INCH POLY NEAR THE INTERSECTION ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5023 080.75262 113,015 INSTALL 3,347 FEET OF 6 INCH AND 3,174 FEET OF 2 INCH POLY ALONG THE STREETS OF SUN CITY NH 77. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER 5024 080.75263 204,040 RELOCATE FACILITIES. INSTALL 755 FEET OF 2 INCH POLY AND ABANDONING 755 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 5025 080.75270 2,547 INSTALL 30 FEET OF 12 INCH POLY AND ABANDON 30 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 5026 080.75273 4,176 INTEGRITY DIGS AND REMEDIATION ALONG LINE CA (2ND) IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 5027 080.75274 11,802 INSTALL 1,100 FEET OF 2 INCH POLY ALONG EXCHANGE CIRCLE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL COPPELL GROWTH JUNE 5028 080.75276 794,474 INSTALL 640 FEET OF 4 INCH AND 2,795 FEET OF 2 INCH POLY ALONG THE ALLEY NO ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5029 080.75278 449,503 INSTALL 2,417 FEET OF 2 INCH POLY ALONG ROBINSON AVENUE AND LAMAR STREET AND 321 FEET OF 4 INCH POLY ALONG MYRTA STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY SEPTEMBER 5030 080.75279 350,208 INSTALL 2,768 FEET OF 2 INCH POLY ALONG WASHINGTON STREET AND MYRTA STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY JULY MTX Additions Page 147 of 178 366 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5031 080.75280 559,934 INSTALL 320 FEET OF 4 INCH AND 2,300 FEET OF 2 INCH POLY NEAR THE INTERSECTION OF SAN VINCENT AND MATTERHORN IN DALLAS AND ABANDON 1,625 FEET OF 4 INCH, 995 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5032 080.75281 391,577 INSTALL 1,283 FEET OF 4 INCH POLY ALONG EARL GARRETT STREET AND HILLCRES ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY SEPTEMBER 5033 080.75286 10,997 INSTALL 525 FEET OF 4 INCH POLY ALONG THE STREETS OF TRADITIONS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH SEPTEMBER 5034 080.75289 22,680 INSTALL 100 FEET OF 2 INCH POLY ALONG SODA RIDGE ROAD. RESIDENTIAL SOUTHLAKE GROWTH OCTOBER 5035 080.75293 132,044 INSTALL 1,140 FEET OF 2 INCH POLY ALONG KEMROCK AND BLUNTER STREET. RESIDENTIAL DALLAS GROWTH JUNE 5036 080.75299 715,915 INSTALL 10,490 FEET OF 2 INCH, 1,141 FEET OF 4 INCH, AND 2,177 FEET OF 8 INCH POLY ALONG THE STREETS OF CAMBRIDGE CROSSING SUBDIVISION IN CELINA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH DECEMBER 5037 080.75301 339,208 INSTALL 80 FEET OF 2 INCH, 1,580 FEET OF 4 INCH POLY ALONG MCLENNAN AVENU ALL CUSTOMERS MART SYSTEM INTEGRITY DECEMBER 5038 080.75303 252 INSTALL 250 FEET OF 2 INCH POLY ALONG FOREST LANE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL GARLAND GROWTH JUNE 5039 080.75313 61,440 INSTALL 1,100 FEET OF 4 INCH POLY AND ABANDON 1,100 FEET OF 2 INCH POLY ALONG OLD DENTON ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS CARROLLTON SYSTEM IMPROVEMENT DECEMBER 5040 080.75314 474,849 INSTALL 3,200 FEET OF 4 INCH POLY ALONG WEDGEMONT CIRCLE NORTH IN FORT WORTH AND ABANDON 600 FEET OF 4 INCH POLY AND 2,600 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5041 080.75315 106,861 REPLACE DISTRICT REGULATOR STATION #11 AND 40 FEET OF 2 INCH AND 40 FEET ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY JUNE 5042 080.75317 31,212 INSTALL 250 FEET OF 4 INCH, 920 FEET OF 2 INCH POLY ALONG THE STREETS OF BENTWOOD SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SAN ANGELO GROWTH SEPTEMBER 5043 080.75318 29,977 INSTALL 1,880 FEET OF 2 INCH POLY ALONG THE STREETS OF BENTWOOD SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SAN ANGELO GROWTH SEPTEMBER 5044 080.75319 301 INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 200 FEET OF 2 INCH POLY ALONG STREETS OF DALLAS COUNTY. ALL CUSTOMERS ADDISON SYSTEM INTEGRITY DECEMBER 5045 080.75321 98,543 INSTALL DISTRICT REGULATOR STATION #01, 40 FEET OF 2 INCH, 40 FEET OF 4 INCH ALL CUSTOMERS MAYPEARL SYSTEM INTEGRITY DECEMBER 5046 080.75327 (22,688) INSTALL 8 INCH MAIN LINE VALVE ASSEMBLY AFTER S20 AND S20-1 IN LANCASTER AND ABANDON 2 INCH DISTRICT REGULATOR STATION AT S20 TO O1- 1. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY SEPTEMBER 5047 080.75328 283,010 INSTALL 475 FEET OF 6 INCH POLY ALONG CRAIK STREET AND ABANDON 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY SEPTEMBER 5048 080.75330 15,662 INSTALL 260 FEET OF 2 INCH POLY ALONG CARROLL STREET. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER 5049 080.75334 (42) INSTALL 100 FEET OF 2 INCH POLY ALONG FERGUSON AVENUE. RESIDENTIAL ROCKDALE GROWTH JUNE 5050 080.75335 495,248 INSTALL 2,470 FEET OF 6 INCH, 6,115 FEET OF 4 INCH AND 4,015 FEET OF 2 INCH POLY ALONG THE STREETS OF BEL-AIRE VILLAGE SUBDIVISION IN SHERMAN. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SHERMAN GROWTH DECEMBER 5051 080.75336 1,382 INSTALL 150 FEET OF 2 INCH POLY ALONG HILL STREET. ALL CUSTOMERS GRAND PRAIRIE GROWTH APRIL 5052 080.75341 140,044 INSTALL 720 FEET OF 2 INCH POLY ALONG RUSH STREET AND ABANDON 720 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY JULY 5053 080.75342 223,068 INSTALL 2,030 FEET OF 2 INCH POLY ALONG HADLEY AND BRYAN STREET AND ABAN ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY SEPTEMBER 5054 080.75343 140,354 INSTALL 630 FEET OF 4 INCH POLY ALONG FERNDALE DRIVE AND ABANDON 630 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY SEPTEMBER 5055 080.75351 3,361 INSTALL 495 FEET OF 2 INCH POLY ALONG CHIPALTA DRIVE IN LEANDER, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL LEANDER GROWTH DECEMBER 5056 080.75354 224,452 INSTALL 1,400 FEET OF 4 INCH POLY ALONG BRYANT STREET AND ABANDON 1,400 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY OCTOBER 5057 080.75356 504,480 INSTALL 2,700 FEET OF 4 INCH POLY ALONG LLANO AVENUE AND ABANDON 2,700 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY SEPTEMBER 5058 080.75359 140,415 INSTALL 1,480 FEET OF 4 INCH POLY ALONG THE STREETS OF THE VILLAGES ON MAIN SUBDIVISION IN FRISCO. ALL CUSTOMERS FRISCO GROWTH OCTOBER 5059 080.75367 89,620 INSTALL DISTRICT REGULATOR STATION #15 ALONG THE STREETS OF CISCO AND ABANDON DISTRICT REGULATOR STATION #15 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY OCTOBER 5060 080.75368 454,675 INSTALL 202 FEET OF 2 INCH, 1,285 FEET OF 4 INCH, 926 FEET OF 6 INCH POLY ALON ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY DECEMBER 5061 080.75369 450,615 INSTALL 552 FEET OF 6 INCH, 2,278 FEET OF 4 INCH, AND 4,303 FEET OF 2 INCH POLY ALONG THE STREETS OF OMEGA RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER 5062 080.75370 31,961 INSTALL 160 FEET OF 2 INCH POLY ALONG EAST 10TH STREET. RESIDENTIAL FERRIS GROWTH JUNE 5063 080.75378 15,177 INSTALL 1,073 FEET OF 4 INCH POLY ALONG VISTA WAY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL BENBROOK GROWTH JULY 5064 080.75379 261,941 INSTALL 1,300 FEET OF 4 INCH, 950 FEET OF 2 INCH POLY ALONG NORTH KOLLMAN ROAD AND ABANDON 2,150 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER 5065 080.75380 125,835 INSTALL DISTRICT REGULATOR STATION #05 ALONG WEST DOYLE IN GRANBURY AND ABANDON DISTRICT REGULATOR STATION #05 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY DECEMBER 5066 080.75381 254,104 INSTALL DISTRICT REGULATOR STATIONS #06 & #08 AND 60 FEET OF 2 INCH, 90 FEE ALL CUSTOMERS HAMILTON SYSTEM INTEGRITY DECEMBER 5067 080.75383 104,260 INSTALL DISTRICT REGULATOR STATION #03 ALONG WEST FREY STREET IN STEPHE ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY SEPTEMBER 5068 080.75384 (14,122) RELOCATE FACILITIES. INSTALL 240 FEET OF 2 INCH POLY ALONG STACY ROAD AND ABANDON 230 FEET OF 2 INCH POLY. ALL CUSTOMERS FAIRVIEW RELOCATION OF FACILITIES JULY 5069 080.75392 101,745 INSTALL 32 RECTIFIER RING MAIN UNITS (RMUS) DUE TO 3G SUNSET IN ROUND ROCK. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY OCTOBER 5070 080.75393 1,581 INSTALL 50 FEET OF 4 INCH POLY ALONG STREET IN GRAPEVINE. COMMERCIAL OR INDUSTRIAL GRAPEVINE GROWTH SEPTEMBER 5071 080.75396 67,335 INSTALL 1,800 FEET OF 4 INCH AND 235 FEET OF 2 INCH POLY ALONG THE STREETS OF THE PRESERVE SUBDIVISION IN SHERMAN. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SHERMAN GROWTH OCTOBER 5072 080.75398 398,040 INSTALL 150 FEET OF 6 INCH AND 1,300 FEET OF 2 INCH POLY ALONG THE STREETS OF BRITTANY LANE AND ABANDON 150 FEET OF 6 INCH AND 1,258 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5073 080.75399 362,013 INSTALL TWO (2) DISTRICT REGULATOR STATIONS, 20 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY. ABANDON DISTRICT REGULATOR STATIONS FARMERSVILLE DRS06 ALONG BOIS D' ARC AVE AND HILL STREET AND FARMERSVILLE DRS07 AT COLLEGE STREET AND N. RIKE STREET AND 7 FEET OF 2 INCH, 10 FEET OF 6 INCH POLY AND 47 FEET OF 4 INCH, 2 FEET OF 6 INCH STEEL IN FARMERSVILLE, COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY DECEMBER 5074 080.75400 678,750 INSTALL 1,700 FEET OF 6 INCH AND 1,200 FEET OF 2 INCH POLY ALONG THE STREETS OF DAVIS DRIVE AND ST. MARIA COURT IN ARLINGTON AND ABANDON 1,665 FEET OF 6 INCH AND 1,176 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5075 080.75402 295,892 INSTALL 2,400 FEET OF 2 INCH POLY ALONG THE STREET OF ACADEMY DRIVE IN ARLINGTON AND ABANDON 55 FEET OF 4 INCH, 1,191 FEET OF 2 INCH AND 1,138 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5076 080.75404 389,130 INSTALL 3,350 FEET OF 4 INCH POLY ALONG SUMMIT AVENUE IN ARLINGTON AND ABANDON 3,165 FEET OF 4 INCH STEEL AND 140 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5077 080.75408 297,652 INSTALL 2,900 FEET OF 2 INCH POLY AND ABANDON 2,192 FEET OF 2 INCH AND 319 FEET OF 2 INCH STEEL ALONG SHADY LANE AND W. 4TH ARLINGTON, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER MTX Additions Page 148 of 178 367 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5078 080.75409 322,029 INSTALL 2,500 FEET OF 2 INCH POLY AND ABANDON 1,671 FEET OF 2 INCH STEEL AND 677 FEET OF 2 INCH POLY ALONG VARSITY CIRCLE IN ARLINGTON, TARRANT COUNTY, IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5079 080.75411 479,939 INSTALL 1,710 FEET OF 2 INCH ALONG 9TH AND BEVERLY STREET AND ABANDON 2,332 FEET OF STEEL AND 653 FEET OF POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 5080 080.75413 213,683 INSTALL 1,745 FEET OF 2 INCH POLY ALONG HAYES AND SEYMOUR ROAD IN WICHIT ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 5081 080.75421 100,686 RELOCATE FACILITIES. INSTALL 161 FEET OF 6 INCH POLY AND ABANDON 100 FEET OF 6 INCH POLY ALONG THE STREETS OF NORTHLAKE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTHLAKE SYSTEM INTEGRITY SEPTEMBER 5082 080.75425 259,073 INSTALL 1,850 FEET OF 4 INCH, 5,700 FEET OF 2 INCH POLY ALONG THE STREETS OF AMBERGROVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH JUNE 5083 080.75428 6,854 RELOCATE FACILITIES. INSTALL 2,530 FEET OF 4 INCH AND 500 FEET OF 2 INCH POL ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JULY 5084 080.75430 110,596 INSTALL 3,750 FEET OF 2 INCH POLY ALONG LONGHORN LANE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH SEPTEMBER 5085 080.75440 28,299 INSTALL 450 FEET OF 4 INCH POLY ALONG NORTH 12TH AND MULBERRY AND ABANDON 100 FEET OF 4 INCH CAST IRON AND 350 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 5086 080.75442 (7) INSTALL POLY SERVICE AND ABANDON POLY I SERVICE LINE. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY MARCH 5087 080.75445 177,989 INSTALL 1,985 FEET OF 4 INCH, 1,920 FEET OF 2 INCH POLY ALONG THE STREETS OF BLUEBONNET ESTATES SUBDIVISION IN ENNIS, ELLIS COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ENNIS GROWTH DECEMBER 5088 080.75446 8,472 INSTALL DISTRICT REGULATOR STATION #05 NEAR INTERSECTION OF WEST MAIN STREET AND NORTH COWAN STREET IN DECATUR AND ABANDON DISTRICT REGULATOR STATION #05 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY DECEMBER 5089 080.75447 9,156 INSTALL MONITOR REGULATOR IN DISTRICT REGULATOR STATION #06 ALONG WOOD STREET IN GRAPEVINE AND AND ABANDON MONITOR REGULATOR IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER 5090 080.75454 77,083 INSTALL 240 FEET OF 4 INCH POLY ALONG THE STREETS OF SANGER AND ABANDON 210 FEET OF 4 INCH STEEL AND 45 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER SYSTEM INTEGRITY APRIL 5091 080.75459 709,022 RELOCATE FACILITIES. INSTALL 2,500 FEET OF 4 INCH, 70 FEET OF 2 INCH POLY ALO ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY DECEMBER 5092 080.75461 (57,515) RELOCATE FACILITIES. INSTALL 180 FEET OF 4 INCH POLY AND ABANDON 253 FEET OF 2 INCH STEEL ALONG 6TH STREET TO ACCOMMODATE NEW HOTEL. ALL CUSTOMERS WACO RELOCATION OF FACILITIES AUGUST 5093 080.75464 69,562 INSTALL DISTRICT REGULATOR STATION #19 AND 70 FEET OF 4 INCH POLY ALONG BUFFALO STREET AND ABANDON DISTRICT REGULATOR STATION #19 AND 70 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER 5094 080.75465 70,828 INSTALL DISTRICT REGULATOR STATION #20 AND 85 FEET OF 6 INCH ALONG THE INTERSECTION OF CLAUDE AND MAIN STREET AND ABANDON DISTRICT REGULATOR STATION #20 AND 85 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY DECEMBER 5095 080.75466 282,921 INSTALL DISTRCT REGULATOR STATION DRS01 ALONG S. BUTLER DRIVE AND W. MAIN STREET AND DRS02 ALONG N. BONHAM DRIVE AND W. COATS DRIVE, 22 FEET OF 2 INCH AND 22 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS01 AND DRS02 AND 6 FEET OF 2INCH, 9 FEET OF 3 INCH POLY AND 6 FEET OF 4 INCH STEEL IN ALLEN, COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN SYSTEM INTEGRITY DECEMBER 5096 080.75473 158,399 INSTALL 235 FEET OF 4 INCH POLY AND ABANDON 200 FEET OF 4 INCH POLY ALONG EAST ELDORADO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER 5097 080.75483 175,283 INSTALL 2,154 WIRELESS METER READING ENDPOINTS ON RESIDENTIAL METER READER IN ROUNDROCK SERVICE AREA. ALL CUSTOMERS UNINCORPORATED SYSTEM IMPROVEMENT DECEMBER 5098 080.75485 114,878 INSTALL DISTRICT REGULATOR STATION #08 AND 40 FEET OF 2 INCH, 40 FEET OF 4 INCH ALONG WEST AVENUE C AND ABANDON DISTRICT REGULATOR STATION #08 AND 40 FEET OF 3 INCH, 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY JUNE 5099 080.75486 182,026 INSALL 1,163 FEET OF 2 INCH, 688 FEET OF 4 INCH POLY AND ABANDON 1,740 FEET OF 2 INCH STEEL, 23 FEET OF 2 INCH POLY ALONG MOBERLY STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5100 080.75488 320,229 INSTALL 1,400 FEET OF 4 INCH, 1,400 FEET OF 2 INCH POLY ALONG NORTH KOLLMAN ROAD AND ABANDON 1,950 FEET OF 2 INCH STEEL AND 850 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER 5101 080.75489 129,553 INSTALL DISTRICT REGULATOR STATION #03 AND 40 FEET OF 2 INCH, 40 FEET OF 4 ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY JUNE 5102 080.75490 221,657 INSTALL 1,260 FEET OF 4 INCH, 15 FEET OF 3 INCH, 125 FEET OF 2 INCH POLY ALONG 24TH STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY JUNE 5103 080.75493 86,374 INSTALL DISTRICT REGULATOR STATION #09 AND 40 FEET OF 2 INCH, 40 FEET OF 4 ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY JULY 5104 080.75499 3,064 INSTALL 1,315 FEET OF 2 INCH POLY ALONG THE STREETS OF MARINE CREEK RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JUNE 5105 080.75504 14,969 INSTALL 150 FEET OF 6 INCH POLY ALONG ROY ORR BOULEVARD ALL CUSTOMERS GRAND PRAIRIE GROWTH APRIL 5106 080.75505 27,262 INSTALL 105 FEET OF 4 INCH POLY ALONG THE STREET OF STAR MEADOW DRIVE. ALL CUSTOMERS PROSPER GROWTH DECEMBER 5107 080.75506 58,473 INSTALL 1,450 FEET OF 4 INCH POLY ALONG JOHN CARPLENTER FREEWAY (SH114) ALL CUSTOMERS GRAND PRAIRIE GROWTH SEPTEMBER 5108 080.75507 1,293,422 INSTALL 3,425 FEET OF 2 INCH AND 1,220 FEET OF 4 INCH POLY NEAR THE INTERSECTION OF LEATH AND HAMMERLY IN DALLAS AND ABANDON 825 FEET OF 3 INCH POLY AND 3,820 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5109 080.75508 32,289 INSTALL 750 FEET OF 6 INCH POLY ALONG I-35 WEST IN BURLESON. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL BURLESON GROWTH DECEMBER 5110 080.75509 28,398 INSTALL 100 FEET OF 2 INCH POLY ALONG VERBENA STREET. RESIDENTIAL FORT WORTH GROWTH JUNE 5111 080.75515 4,867 INSTALL A NEW ROUTER AT PILOT POINT SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT APRIL 5112 080.75517 2,291 INSTALL 450 FEET OF 2 INCH ALONG OAKBEND DRIVE AND CEIELO AZURE LANE. COMMERCIAL OR INDUSTRIAL LEWISVILLE GROWTH DECEMBER 5113 080.75520 61,079 INSTALL 250 FEET OF 2 INCH POLY ALONG 2ND STREET AND ABANDON 300 FEET OF 4 INCH, 750 FEET OF 3 INCH STEEL, 15 FEET OF 4 INCH BARE STEEL, 490 FEET OF 3 INCH, 350 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELESTE SYSTEM INTEGRITY DECEMBER 5114 080.75521 4,782 INSTALL 2 1/2 FOOTAGE PIERCING U262 IN WACO DISTRICT. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT JANUARY 5115 080.75525 46,035 INSTALL 3,335 FEET OF 6 INCH POLY ALONG THE STREETS OF CAMBRIDGE BROOK SUBDIVISION IN DENTON, DENTON COUNTY. ALL CUSTOMERS DENTON GROWTH DECEMBER 5116 080.75529 360,252 INSTALL 5,170 FEET OF 2 INCH AND 3,340 FEET OF 4 INCH POLY AONG THE STREETS OF WALTON RIDGE SUBDIVISION IN CORINTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CORINTH GROWTH DECEMBER 5117 080.75541 177,542 INSTALL 900 FEET OF 4 INCH, 350 FEET OF 2 INCH POLY AND ABANDON 30 FEET OF 6 INCH, 880 FEET OF 4 INCH, 550 FEET OF 2 INCH STEEL ALONG JOHNSON STREET. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY SEPTEMBER 5118 080.75547 532,016 INSTALL 100 FEET OF 2 INCH, 2,550 FEET OF 4 INCH POLY ALONG WEDGEMONT CIRCLE SOUTH IN FORT WORTH AND ABANDON 2,600 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5119 080.75551 445,701 INSTALL 4,385 FEET OF 4 INCH, 3,810 FEET OF 2 INCH POLY ALONG THE STREET OF NORTH STAR SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER 5120 080.75552 31,872 INSTALL 585 FEET OF 6 INCH, 1,430 FEET OF 4 INCH POLY ALONG I-35 WEST. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH JUNE MTX Additions Page 149 of 178 368 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5121 080.75556 59,219 INSTALL DISTRICT REGULATOR STATION #29 AT THE INTERSECTION OF PHILLIPS AND MADDISON AND ABANDON DISTRICT REGULATOR STATION #29 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER 5122 080.75557 3,644 INSTALL 430 FEET OF 2 INCH POLY ALONG WILHITES ESTATES AT NEWTON COURT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL VALLEY VIEW GROWTH JUNE 5123 080.75558 142,221 INSTALL DISTRICT REGULATOR STATION #31 AT THE INTERSECTION OF BORDER AND BRYAN IN CLEBURNE AND ABANDON DISTRICT REGULATOR STATION #31 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER 5124 080.75559 28,085 INSTALL 450 FEET OF 2 INCH POLY ALONG STREETS OF GRAND PRAIRIE. ALL CUSTOMERS GRAND PRAIRIE GROWTH OCTOBER 5125 080.75560 688,810 INSTALL 2,190 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY ALONG THE INTERSECTION OF DEERWOOD AND RACINE AND ABANDON 2,190 FEET OF 3 INCH, 395 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5126 080.75561 (19,523) RELOCATE FACILITIES. INSTALL 615 FEET OF 2 INCH POLY ALONG BUSINESS 287 AND I-44 ACCESS ROAD AND ABANDON 615 FEET OF 2 INCH STEEL TO ACCOMODATE TXDOT STREET IMPROVEMENT PROJECT. ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES DECEMBER 5127 080.75562 75,356 INSTALL DISTRICT REGULATOR STATION #10 AT INTERSECTION OF WEST WILSON STREET AND NORTH FIELD STREET IN CLEBURNE AND ABANDON DISTRICT REGULATOR STATION #10 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER 5128 080.75563 73,615 INSTALL DISTRICT REGULATOR STATION #07 AT THE INTERSECTION OF WEST WILSON STREET AND NORTH BUFFALO STREET IN CLEBURNE AND ABANDON DISTRICT REGULATOR STATION #07 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER 5129 080.75565 37,466 INSTALL DISTRICT REGULATOR STATION #04 AT THE INTERSECTION OF EAST HENDERSON AND NORTH LEWIS AND ABANDON DISTRICT REGULATOR STATION #04 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER 5130 080.75567 747,770 REPLACE 191 SERVICE LINES IN DUNCANVILLE IN ACCORDANCE WITH RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY SEPTEMBER 5131 080.75571 178,350 ABANDON 1,335 FEET OF 3 INCH AND 300 FEET OF 2 INCH POLY ALONG FM 1777 IN JOSEPHINE. ALL CUSTOMERS JOSEPHINE SYSTEM INTEGRITY DECEMBER 5132 080.75574 298,003 INSTALL 60 FEET OF 12 INCH POLY ALONG BANK STREET AND ABANDON 60 FEET OF 12 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 5133 080.75575 409,410 INSTALL 68 FEET IN 2 INCH, 984 FEET OF 4 INCH, 1,007 FEET OF 6 INCH POLY AND AB ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY DECEMBER 5134 080.75578 661,517 INSTALL 2,160 FEET OF 4 INCH AND 470 FEET OF 2 INCH POLY NEAR THE INTERSECT ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5135 080.75579 77,408 INSTALL 950 FEET OF 2 INCH POLY ALONG THE STREETS OF TRINITY FALLS. RESIDENTIAL MCKINNEY GROWTH DECEMBER 5136 080.75580 566,123 INSTALL 1,050 FEET OF 6 INCH, 6,315 FEET OF 4 INCH, 5,385 FEET OF 2 INCH POLY ALONG THE STREETS OF CHAPEL CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER 5137 080.75581 3,099 ISNTALL 970 FEET OF 4 INCH POLY ALONG NORTH INDUSTRIAL BOULEVARD AND FM 157. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL EULESS GROWTH JUNE 5138 080.75582 75 INSTALL SECURITY GATE OPERATOR FOR WICHITA FALLS. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JANUARY 5139 080.75584 143,923 INSTALL 1,950 FEET OF 2 INCH POLY FOR THE BROWNWOOD REGIONAL AIRPORT AND ABANDON 75 FEET OF 2 INCH POLY AND 2,002 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNINCORPORATED SYSTEM INTEGRITY JUNE 5140 080.75585 7,016 INSTALL 2,770 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER 5141 080.75587 135,030 INSTALL 471 FEET OF 4 INCH POLY ALONG DELAWARE SPRING BOULEVARD AND ABANDON 64 FEET OF 4 INCH POLY AND MAIN LINE REGULATOR #03. ALL CUSTOMERS BURNET RELOCATION OF FACILITIES SEPTEMBER 5142 080.75588 23,533 INSTALL 3,490 FEET OF 2 INCH POLY ALONG THE STREETS OF BAR W RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH NOVEMBER 5143 080.75589 213,591 INSTALL 5,330 FEET OF 2 INCH, 1,410 FEET OF 4 INCH POLY ALONG THE STREETS OF VERNADAH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH DECEMBER 5144 080.75598 734,457 INSTALL 1,529 FEET OF 6 INCH, 659 FEET OF 2 INCH, 539 FEET OF 4 INCH POLY ALON ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5145 080.75600 49,720 INSTALL 1,729 FEET OF 6 INCH, 2,518 FEET OF 4 INCH AND 4,108 FEET OF 2 INCH POLY ALONG THE STREETS OF BAR W RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH NOVEMBER 5146 080.75601 28,520 INSTALL RELIEF VALVE IN MORAN AND ABANDON RELIEF VALVE AT MEASURING STATION 6567.2 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MORAN SYSTEM INTEGRITY JUNE 5147 080.75604 70,723 INSTALL 1,223 FEET OF 2 INCH POLY ALONG HOGAN'S ALLEY DRIVE IN ARLINGTON, TARRANT COUNTY. RESIDENTIAL ARLINGTON GROWTH DECEMBER 5148 080.75605 696,725 REPLACE 234 SERVICE LINES ALONG THE STREETS OF LAMPASAS IN ACCORDANCE WITH RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS LAMPASAS SYSTEM INTEGRITY SEPTEMBER 5149 080.75606 132,042 INSTALL 740 FEET OF 2 INCH POLY ALONG SHELTON STREET AND ABANDON 626 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 5150 080.75608 612,492 INSTALL 3,600 FEET OF 2 INCH POLY ALONG COLLEGE STREET IN SULPHUR SPRINGS AND ABANDON 3,650 FEET OF 4 INCH STEEL AND 995 FEET 4 INCH, 230 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY SEPTEMBER 5151 080.75615 48,944 INSTALL 3,080 FEET OF 2 INCH AND 2,135 FEET OF 4 INCH POLY ALONG THE STREETS OF STARK FARMS IN DENTON. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH DECEMBER 5152 080.75618 864,148 INSTALL 1,540 FEET OF 2 INCH, 2,490 FEET OF 4 INCH AND 235 FEET OF 6 INCH POLY ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5153 080.75620 52,220 INSTALL 290 FEET OF 4 INCH POLY ALONG NORTHWEST HIGHWAY. COMMERCIAL OR INDUSTRIAL GRAPEVINE GROWTH OCTOBER 5154 080.75624 448,481 INSTALL 2,900 FEET OF 2 INCH POLY AND ABANDON 2,800 FEET OF 2 INCH POLY ALONG WALES COURT IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5155 080.75625 457,988 INSTALL 840 FEET OF 4 INCH, 1,895 FEET OF 2 INCH POLY NEAR THE INTERSECTION OF SAN VICENTE AND SHILOH IN DALLAS AND ABANDON 810 FEET OF 8 INCH, 30 FEET OF 4 INCH AND 1,895 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5156 080.75628 216,522 INSATLL 1,645 FEET OF 4 INCH POLY AND ABANDON 1,665 FEET OF 2 INCH STEEL ALONG FLAMINGO ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 5157 080.75629 146,551 INSTALL 2,015 FEET OF 4 INCH, 625 FEET OF 2 INCH POLY ALONG THE STREETS OF COPPER CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER 5158 080.75630 1,759 PURCHASE TEST GAUGES AND CERTIFICATIONS TO BE USED BY COMPLIANCE GROUP IN SOUTHEAST REGION DALLAS. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT MARCH 5159 080.75635 128,663 INSTALL 3,045 FEET OF 2 INCH POLY ALONG THE STREETS OF COPPER CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER 5160 080.75640 19,783 INSTALL 100 FEET OF 2 INCH POLY ALONG JENNY GEORGE LANE. COMMERCIAL OR INDUSTRIAL SWEETWATER GROWTH JUNE 5161 080.75642 445,495 INSTALL 2,090 FEET OF 4 INCH POLY ALONG LAGONDA AVENUE IN FORT WORTH AND ABANDON 2,089 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5162 080.75644 5,826 INSTALL 220 FEET OF 2 INCH POLY ALONG SUNSET DRIVE. RESIDENTIAL MARBLE FALLS GROWTH JUNE 5163 080.75646 253,462 INSTALL 4,250 FEET OF 2 INCH AND 3,300 FEET OF 4 INCH POLY ALONG THE STREETS OF TERRACINA ESTATES. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH JULY 5164 080.75647 1,468,425 INSTALL 430 FEET OF 8 INCH AND 2,200 FEET OF 12 INCH POLY ALONG WALNUT HILL AND MIDWAY IN DALLAS AND ABANDON 70 FEET OF 8 INCH POLY AND 475 FEET OF 8 INCH, 2,200 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 5165 080.75648 1,031,398 INSTALL 3,185 FEET OF 2 INCH AND 1,360 FEET OF 4 INCH POLY ALONG THE INTERS ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 5166 080.75649 70,779 INSTALL 130 FEET OF 4 INCH AND 372 FEET OF 2 INCH POLY ALONG NORTH NEATHERY AND ELM STREETS AND ABANDON 120 FEET OF 3 INCH AND 370 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROADF COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLINSVILLE SYSTEM INTEGRITY APRIL MTX Additions Page 150 of 178 369 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5167 080.75650 784,339 INSTALL 4,215 FEET OF 4 INCH POLY ALONG ODESSA AND LEATH AND ABANDON 480 FEET OF 6 INCH, 3,465 FEET OF 3 INCH AND 10 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5168 080.75651 1,237,178 INSTALL 3,370 FEET OF 2 INCH AND 300 FEET OF 4 INCH POLY NEAR THE INTERSECT ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5169 080.75653 1,312,913 INSTALL 1,280 FEET OF 4 INCH POLY ALONG TEXAS STREET AND INSTALL 2,750 FEE ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY DECEMBER 5170 080.75654 15,540 INSTALL 100 FEET OF 2 INCH POLY ALONG THE STREETS OF RICHLAND HILLS. RESIDENTIAL RICHLAND HILLS GROWTH DECEMBER 5171 080.75656 504,676 INSTALL 2,054 FEET OF 4 INCH POLY ALONG FLAMINGO ROAD FROM BROOKLINE AVENUE TO OAK HILL STREET IN FORT WORTH AND ABANDON 2,012 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 5172 080.75657 80,346 INSTALL 360 FEET OF 6 INCH POLY AND ABANDON 435 FEET OF 6 INCH STEEL ALONG TRAIL LAKE DRIVE. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE 5173 080.75658 573,380 INSTALL 1,850 FEET OF 6 INCH POLY ALONG HAINES STREET AND ABANDON 1,850 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 5174 080.75660 31,952 RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY SEPTEMBER 5175 080.75666 480,081 INSTALL 1,900 FEET OF 8 INCH AND 15,130 FEET OF 2 INCH POLY ALONG THE STREETS OF WILDCAT RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH OCTOBER 5176 080.75672 54,004 INSTALL 370 FEET OF 2 INCH POLY ALONG THE STREETS IN STAMFORD. RESIDENTIAL STAMFORD GROWTH DECEMBER 5177 080.75676 8,083 INSTALL 100 FEET OF 2 INCH POLY ALONG VINEYARD DRIVE. RESIDENTIAL GRANBURY GROWTH JULY 5178 080.75682 30,873 DART METER REPLACEMENT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JUNE 5179 080.75690 419,197 INSTALL 8,162 FEET OF 2 INCH AND 2,250 FEET OF 4 INCH POLY ALONG THE STREETS OF CELINA HILLS SUBDIVISION. RESIDENTIAL CELINA GROWTH DECEMBER 5180 080.75694 180,780 INSTALL 1,400 FEET OF 4 INCH AND 1,600 FEET OF 2 INCH POLY ALONG THE STREETS OF HERITAGE PARK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ABILENE GROWTH DECEMBER 5181 080.75698 708,820 INSTALL 2,620 FEET OF 4 INCH AND 160 FEET OF 2 INCH POLY AND ABANDON 515 FE ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5182 080.75702 35,995 RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY ALONG FM 1417 AND ABANDON 250 FEET OF 4 INCH POLY TO ACCOMODATE TXDOT HWY IMPROVEMENTS. ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES MARCH 5183 080.75705 444,232 INSTALL 406 FEET OF 2 INCH, 240 FEET OF 4 INCH POLY ALONG SOUTH CHURCH AND NEW STREET AND ABANDON 2,667 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY SEPTEMBER 5184 080.75706 93,926 INSTALL 348 FEET OF 4 INCH POLY ALONG MADDOX AVENUE AND ABANDON 348 FEET OF 4 INCH STEEL. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 5185 080.75709 17,425 INSTALL 70 FEET OF 4 INCH POLY ALONG GEORGE BUSH IN GARLAND, DALLAS COUNTY. COMMERCIAL OR INDUSTRIAL GARLAND GROWTH SEPTEMBER 5186 080.75712 421,357 INSTALL 95 FEET OF 2 INCH, 720 FEET OF 4 INCH, 1,320 FEET OF 6 INCH POLY ALONG ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY SEPTEMBER 5187 080.75713 220,761 REPLACEMENT OF MID-TEX 54 LAPTOPS, 61 DOCKING STATIONS AND 30 MONITORS FOR LINCOLN CENTER II AND PLANO SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT SEPTEMBER 5188 080.75716 170,697 INSTALL DISTRICT REGULATOR STATION #01 AND 80 FEET OF 2 INCH, 40 FEET OF 4 ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY DECEMBER 5189 080.75717 161,019 INSTALL DISTRICT REGULATOR STATION #04 AND 40 FEET OF 4 INCH, 40 FEET OF 2 INCH POLY ALONG WEST REDBUD LANE AND ABANDON DISTRICT REGULATOR STATION #04 AND 40 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY JUNE 5190 080.75720 107,206 INSTALL 190 FEET OF 2 INCH POLY ALONG WILLIAM STREET AND ABANDON 190 FEET OF 6 INCH STEEL AND 10 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER 5191 080.75722 142,804 INSTALL 700 FEET OF 4 INCH POLY ALONG KENDOLPH DRIVE AND ABANDON 60 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER 5192 080.75723 318,457 INSTALL 1,808 FEET OF 4 INCH POLY ALONG NELL STREET AND ABANDON 1,820 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 5193 080.75725 59,921 INSTALL PLATFORM AT TURTLE CREEK REGULATOR STATION. ALL CUSTOMERS DALLAS SYSTEM IMPROVEMENT JUNE 5194 080.75728 267,007 INSTALL 1,416 FEET OF 4 INCH POLY ALONG EASTOVER STREET AND ABANDON 849 FEET OF 3 INCH POLY AND 580 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 5195 080.75729 468,234 INSTALL 1,120 FEET OF 4 INCH AND 1,800 FEET OF 2 INCH POLY AND DISTRICT REGU ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY DECEMBER 5196 080.75730 341,250 INSTALL 1,450 FEET OF 2 INCH AND 480 FEET OF 4 INCH POLY ALONG NORTH WARD ALL CUSTOMERS ITALY SYSTEM INTEGRITY SEPTEMBER 5197 080.75731 216,495 INSTALL 1,180 FEET OF 2 INCH POLY ALONG TAYLOR, WHITE, MAIN AND COUCH STR ALL CUSTOMERS ITALY SYSTEM INTEGRITY DECEMBER 5198 080.75736 390,080 INSTALL 1,938 FEET OF 2 INCH POLY ALONG HILLSIDE STREET AND SOUTH HUGHES STREET AND ABANDON 1,954 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5199 080.75742 76,102 INSTALL 460 FEET OF 4 INCH POLY ALONG CHILDERS AVENUE AND ABANDON 440 FEET OF 4 INCH STEEL AND 50 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY SEPTEMBER 5200 080.75745 23,449 INSTALL 5,869 FEET OF 2 INCH AND 3,745 FEET OF 4 INCH POLY ALONG THE STREETS OF BELLA TERRA SUBDIVISION. RESIDENTIAL TEMPLE GROWTH JUNE 5201 080.75746 796,557 INSTALL 2,395 FEET OF 6 INCH, 3,680 FEET OF 4 INCH, AND 3,610 FEET OF 2 INCH POLY ALONG THE STREETS OF CIBOLO HILLS SUBDIVISION IN FORT WORTH. RESIDENTIAL FORT WORTH GROWTH DECEMBER 5202 080.75747 14,369 INSTALL 60 FEET OF 2 INCH POLY ALONG TITUS STREET AND POPE STREET. RESIDENTIAL MCKINNEY GROWTH SEPTEMBER 5203 080.75748 45,060 INSTALL 1,215 FEET OF 4 INCH POLY ALONG W METRO DRIVE IN LEANDER. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL LEANDER GROWTH DECEMBER 5204 080.75750 89,265 INSTALL DISTRICT REGULATOR STATION #21 AND 30 FEET OF 2 INCH AND 30 FEET O ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY OCTOBER 5205 080.75751 12,922 INSTALL 1,709 FEET OF 6 INCH AND 3,936 FEET OF 2 INCH POLY ALONG THE STREETS OF ENTRADA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH SEPTEMBER 5206 080.75752 274,419 INSTALL 1,006 FEET OF 2 INCH, 645 FEET OF 4 INCH POLY ALONG TAHOE DRIVE AND ABANDON 1,629 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 5207 080.75753 596,697 INSTALL 2,900 FEET OF 8 INCH AND 125 FEET OF 2 INCH POLY ALONG DALLAS STRE ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY DECEMBER 5208 080.75754 479,210 INSTALL 2,245 FEET OF 8 INCH, 375 FEET OF 2 INCH AND 200 FEET OF 4 INCH POLY AND ABANDON 70 FEET OF 4 INCH, 607 FEET OF 3 INCH, 144 FEET OF 2 INCH POLY AND 1,150 FEET OF 3 INCH, 638 FEET OF 2 INCH STEEL ALONG DALLAS AND JEFFERSON STREETS IN VAN ALSTYNE, GRAYSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY DECEMBER 5209 080.75756 79,991 INSTALL 2,265 FEET OF 2 INCH AND 738 FEET OF 4 INCH POLY ALONG THE STREETS OF HIGHLAND FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ABILENE GROWTH SEPTEMBER 5210 080.75758 190,150 INSTALL 2,450 FEET OF 2 INCH POLY ALONG MAGNOLIA AND HICKORY AND ABANDON 2,235 FEET OF 2 INCH STEEL AND 215 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY DECEMBER 5211 080.75759 1,411,727 INSTALL 10,806 WMR END POINTS TO COMMERCIAL METERS IN THE DALLAS METRO. ALL CUSTOMERS UNINCORPORATED SYSTEM IMPROVEMENT JUNE 5212 080.75762 70,572 INSTALL (2) 12 INCH STOPPLES, (1) 8 INCH STOPPLE, (1) 6" STOPPLE AND (1) WELD SLEEVE TO SHUT DOWN LOCAL GAS SYSTEM DUE TO THIRD-PARTY DAMAGE. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY NOVEMBER 5213 080.75769 233,354 INSTALL 1,285 FEET OF 4 INCH POLY ALONG PECOS STREET FROM EASTOVER AVENUE TO PARKER HENDERSON IN FORT WORTH AND ABANDON 1,273 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 5214 080.75770 475,605 INSTALL 1,458 OF 2 INCH POLY AND ABANDON 589 FEET OF 2 INCH STEEL AND 24 FEET OF 2 INCH POLY ALONG GLENWOOD LANE IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER 5215 080.75772 16,947 INSTALL 45 FEET IN 2 INCH POLY ALONG STREETS OF WACO IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. RESIDENTIAL WACO GROWTH SEPTEMBER 5216 080.75773 9,167 INSTALL 1,386 FEET OF 4 INCH AND 4,339 FEET OF 2 INCH POLY ALONG THE STREETS OF BRYSON SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH SEPTEMBER MTX Additions Page 151 of 178 370 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5217 080.75777 219,219 INSTALL 2,325 FEET OF 2 INCH POLY ALONG OAK AND PINE AND ABANDON 2,325 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER 5218 080.75778 9,595 INSTALL 530 FEET OF 4 INCH AND 323 FEET OF 2 INCH POLY ALONG SOUTH 10TH STREET IN PFLUGERVILLE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL PFLUGERVILLE GROWTH DECEMBER 5219 080.75780 693,398 INSTALL 70 FEET OF 2 INCH, 3.052 FEET OF 6 INCH, 5 FEET OF 4 INCH POLY ALONG I ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY DECEMBER 5220 080.75782 37,514 INSTALL 286 FEET OF 2 INCH POLY AND ABANDON 286 FEET OF 2 INCH POLY ALONG WELLINGTON IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY JUNE 5221 080.75784 6,183 INSTALL DISTRICT REGULATOR STATION #19 AND ABANDON DISTRICT REGULATOR STATION #19 ALONG LILLIAN STREET BETWEEN LONG AND MCNEIL STREET IN STEPHENVILLE IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY MARCH 5222 080.75785 101,606 INSTALL 2,594 FEET OF 2 INCH POLY ALONG THE STREETS OF MANOR COMMONS SUBDIVISION. RESIDENTIAL MANOR GROWTH DECEMBER 5223 080.75786 463,533 INSTALL 772 FEET OF 4 INCH, 595 FEET OF 2 INCH, 590 FEET OF 6 INCH POLY ALONG HARRINGTON AVENUE AND HOMAN AVENUE IN FORT WORTH AND ABANDON 2,114 FEET OF POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5224 080.75787 229,206 INSTALL 1,669 FEET OF 4 INCH AND 3,916 FEET OF 2 INCH POLY ALONG THE STREETS OF MANOR COMMONS SUBDIVISION. RESIDENTIAL MANOR GROWTH SEPTEMBER 5225 080.75788 462,861 INSTALL 1,450 FEET OF 4 INCH, 404 FEET OF 2 INCH POLY ALONG HOMAN AVENUE FROM NORTHWEST 15TH STREET TO NORTHWEST 14TH STREET IN FORT WORTH AND ABANDON 880 FEET OF 3 INCH STEEL AND 934 FEET OF POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 5226 080.75789 6,295 SMART CAL FOR WACO SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT MARCH 5227 080.75790 5,621 2 (2) SENSIT GOLD G2 FOR BRYAN SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT MARCH 5228 080.75791 409,830 RELOCATE FACILITIES. INSTALL 2,938 FEET OF 6 INCH, 145 FEET OF 4 INCH AND 42 ALL CUSTOMERS NORTH RICHLAND HILLS SYSTEM INTEGRITY DECEMBER 5229 080.75796 6,186 INSTALL 604 FEET OF 8 INCH, 1,358 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH OCTOBER 5230 080.75797 12,496 RELOCATE FACILITIES. INSTALL 277 FEET OF 6 INCH POLY ALONG COUNTY ROAD 199 AND CROSS CREEK BOULEVARD ALL CUSTOMERS HUTTO RELOCATION OF FACILITIES SEPTEMBER 5231 080.75799 467,030 INSTALL 2,100 FEET OF 4 INCH, 1,000 FEET OF 2 INCH POLY ON SH 14 AND COLLEGE STREET IN MEXIA AND ABANDON 2,745 FEET OF 2 INCH STEEL AND 382 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER 5232 080.75801 15,289 INSTALL 647 FEET OF 4 INCH AND 3,247 FEET OF 2 INCH POLY ALONG THE STREETS OF COTTONWOOD CREED SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH SEPTEMBER 5233 080.75803 5,165 INSTALL 341 FEET OF 2 INCH POLY ALONG NEW MEISTER LANE AND MEISTER LANE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL PFLUGERVILLE GROWTH DECEMBER 5234 080.75804 26,179 INSTALL A NEW RECITIFIER AND GROUNDBED IN KILGORE "BAMBURG". ALL CUSTOMERS KILGORE SYSTEM INTEGRITY JUNE 5235 080.75805 20,887 INSTALL 806 FEET OF 8 INCH, 1,040 FEET OF 4 INCH, 1,099 FEET OF 2 INCH POLY ALONG THE STREETS OF SALERNO SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER 5236 080.75806 387,459 INTALL 582 FEET OF 4 INCH, 735 FEET OF 6 INCH POLY ALONG THE ALLEY OF HOMAN AVENUE AND HARRINGTON AVENUE IN FORT WORTH AND ABANDON 640 FEET OF 8 INCH, 584 FEET OF 4 INCH, 94 FEET OF 6 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5237 080.75807 247,910 INSTALL 1,200 FEET OF 2 INCH POLY ALONG MILDRED LANE AND ABANDON 1,200 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY OCTOBER 5238 080.75808 35,823 INSTALL 60 FEET OF 4 INCH POLY ALONG ESTERS AND CONFLANS ROAD AND ABANDON 60 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY SEPTEMBER 5239 080.75812 14,987 INSTALL 920 FEET OF 6 INCH, 1,130 FEET OF 4 INCH, 120 FEET OF 2 INCH POLY ALONG THE STREETS OF GREENS PRAIRIE RESERVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH OCTOBER 5240 080.75813 3,136 INSTALL CALIBRATION STATION FOR 4 GAS MONITORS TO MONITOR H2S/CO/CH4/OS AT THE HASLET SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT MARCH 5241 080.75814 15,604 INSTALL 50 FEET OF 4 INCH AND 1,150 FEET OF 2 INCH POLY ALONG THE STREETS OF GREENS PRAIRIE RESERIVE SUBDIVISION. DEVELOP INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER 5242 080.75815 (1,681) INSTALL 70 FEET OF 4 INCH POLY ALONG BONNIE VIEW ROAD. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES JULY 5243 080.75816 10,688 INSTALL 1,680 FEET OF 2 INCH POLY ALONG THE STREETS OF GREENS PRAIRIE RESERVE SUBDIVISION. DEVELOP INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER 5244 080.75817 6,295 PURCHASE CALIBRATING STATION FOR SENSITS SMART CAL 360 DESKTOP. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT MARCH 5245 080.75818 20,664 INSTALL 925 FEET OF 8 INCH POLY ALONG INTERSTATE 30 AND ABANDON 860 FEET OF 8 INCH POLY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FATE RELOCATION OF FACILITIES SEPTEMBER 5246 080.75819 4,807 DEFIBTECH LIFELINE AED INCLUDING PREP AND RESPONSE KIT. 2 (2) FOR ALTAMESA SERVICE CENTER AND 1 (1) FOR WESTPORT PARKWAY SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT JUNE 5247 080.75821 164,731 INSTALL 770 FEET OF 4 INCH POLY ALONG EAST KELLIS AND ABANDON 445 FEET OF 3 INCH STEEL AND 318 FEET OF 4 INCH POLY IN ACCORDANCE WTIH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5248 080.75822 23,639 INSTALL 334 FEET OF 2 INCH POLY ALONG EAST CHEDDAR LOOP. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL PFLUGERVILLE GROWTH SEPTEMBER 5249 080.75825 76,108 ABANDON 30 FEET&NBSP; OF 4 INCH, 10 FEET OF 6 INCH STEEL IN CITY OF STAMFORD DISTRICT REGULATOR STATIONS #04 AND #22 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY JULY 5250 080.75826 183,457 INSTALL 4,300 FEET OF 2 INCH POLY ALONG THE STREETS OF BAYSIDE WEST SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROWLETT GROWTH DECEMBER 5251 080.75827 80,082 INSTALL 40 FEET OF 2 INCH AND 40 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #03 ALONG 8TH STREET AND ROBINSON STREET AND ABANDON 10 FEET OF 2 INCH POLY AND 10 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILES SYSTEM INTEGRITY SEPTEMBER 5252 080.75828 607,021 INSTALL 260 FEET OF 4 INCH POLY, SWEETWATER DISTRICT REGULATOR STATIONS ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY DECEMBER 5253 080.75829 16,674 INSTALL 240 FEET OF 2 INCH POLY ALONG HIGHWAY 78. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL WYLIE GROWTH SEPTEMBER 5254 080.75830 147,240 INSTALL 80 FEET OF 2 INCH POLY AND LORAINE DISTRICT REGULATOR STATION DRS02 AND ABANDON LORAINE DISTRICT REGLATOR STATION DRS02 AND 10 FEET OF 2 INCH AND 10 FEET OF 3 INCH STEEL ALONG THE STREETS OF LORAINE, MITCHELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LORAINE SYSTEM INTEGRITY DECEMBER 5255 080.75833 293,321 INSTALL 660 FEET OF 4 INCH, 2,020 FEET OF 2 INCH POLY ALONG SUMPTER AND ECHOLS IN MEXIA AND ABANDON 660 FEET OF 4 INCH, 561 FEET OF 2 INCH POLY AND 1,311 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER 5256 080.75842 19,702 INSTALL 950 FEET OF 4 INCH POLY ALONG JOHN DAY ROAD. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH JULY 5257 080.75845 25,674 ABANDON 365 FEET OF 4 INCH, 685 FEET OF 6 INCH, 100 FEET OF 6 INCH STEEL AND DISTRICT REGULATOR STATION #03 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY JULY 5258 080.75847 35,770 INSTALL 120 FEET OF 4 INCH POLY ALONG HIGHWAY 66 AND ABANDON 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 5259 080.75852 21,486 INSTALL 3,054 FEET OF 8 INCH AND 826 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLEBACK SUBDIVSION IN LIBERTY HILL. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER 5260 080.75854 453,196 INSTALL 2,297 FEET OF 8 INCH AND 250 FEET OF 2 INCH POLY ALONG BOBTOWN RO ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 5261 080.75856 19,383 GATE OPERATORS AND ROLL BAR FOR BAR SECURITY GATES. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JUNE 5262 080.75857 4,875 INSTALL 350 FEET OF 2 INCH POLY ALONG BROADE STREET. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL LEANDER GROWTH SEPTEMBER MTX Additions Page 152 of 178 371 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5263 080.75858 75,597 INSTALL 280 FEET OF 8 INCH POLY ALONG VINEYARD ROAD AND ABANDON 280 FEET OF 8 INCH STEEL INSTALL 120 FEET OF 4 INCH POLY ALONG HIGHWAY 66 AND ABANDON 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY JUNE 5264 080.75859 344,290 INSTALL 2,200 FEET OF 4 INCH, 940 FEET OF 2 INCH POLY ALONG SUMPTER AND DENTON IN MEXIA AND ABANDON 550 FEET OF 4 INCH POLY AND 1,630 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER 5265 080.75860 358,748 INSTALL 533 FEET OF 6 INCH, 416 FEET OF 4 INCH IN THE ALLEY OF HOMAN AVENUE AND HARRINGTON AVENUE IN FORT WORTH AND ABANDON 701 FEET OF 6 INCH AND 416 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5266 080.75863 275,555 INSTALL 1,400 FEET OF 4 INCH AND 350 FEET OF 2 INCH POLY ALONG PIONEER DRI ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER 5267 080.75864 15,520 INSTALL 170 FEET OF 2 INCH POLY ALONG LAKESHORE ROAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SHADY SHORES GROWTH SEPTEMBER 5268 080.75867 60,171 INSTALL 185 FEET OF 2 INCH POLY ALONG EAST SOUTH STREET AND ABANDON 110 ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY JUNE 5269 080.75870 43,852 INSTALL 290 FEET OF 2 INCH POLY ALONG TRIPP ROAD AND ABANDON 280 FEET OF 2 INCH STEEL INSTALL 120 FEET OF 4 INCH POLY ALONG HIGHWAY 66 AND ABANDON 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SUNNYVALE SYSTEM INTEGRITY JULY 5270 080.75875 3,658 INSTALL 136 FEET OF 2 INCH POLY ALONG MOORE STREET. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL LEANDER GROWTH JULY 5271 080.75876 201,686 INSTALL 1,125 FEET OF 4 INCH AND 5,425 FEET OF 2 INCH POLY ALONG THE STREETS OF HEARTLAND. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH DECEMBER 5272 080.75878 16,407 INSTALL SEVENTEEN (17) LIGHT FIXTURES AT THE WAXAHACHIE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES APRIL 5273 080.75883 91,960 INSTALL 140 FEET OF POLY AND DISTRICT REGULATOR STATION #01 ALONG MOSS S ALL CUSTOMERS DE LEON SYSTEM INTEGRITY JUNE 5274 080.75887 87,235 INSTALL NEW AIR CONDITIONING UNITS FOR BRYAN SERVICE CENTER ALL CUSTOMERS SYSTEM WIDE STRUCTURES JUNE 5275 080.75890 20,226 PURCHASE NEW OFFICE WIFI AND NETWORKING EQUIPMENT FOR KERRVILLE SERVICE CENTER IN KERRVILLE, KERR COUNTY. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT DECEMBER 5276 080.75894 60,609 INSTALL 140 FEET OF 8 INCH POLY ALONG MEMORIAL PARKWAY AND ABANDON 130 FEET OF 8 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FATE SYSTEM INTEGRITY SEPTEMBER 5277 080.75900 5,616 INSTALL 1,115 FEET OF 2 INCH POLY ALONG THE STREETS OF HORIZON LAKE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH SEPTEMBER 5278 080.75901 19,186 INSTALL 2,647 FEET OF 4 INCH ALONG THE STREETS OF NORTHLINE IN LEANDER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH OCTOBER 5279 080.75907 107,687 INSTALL 400 FEET OF 4 INCH POLY ALONG NORTH RACE STREET AND ABANDON 480 FEET OF 4 INCH, 100 FEET OF 4 INCH STEEL, 158 FEET OF 2 INCH POLY INSTALL 120 FEET OF 4 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209 ALL CUSTOMERS EVERMAN SYSTEM INTEGRITY SEPTEMBER 5280 080.75908 34,349 INSTALL 375 FEET OF 2 INCH POLY ALONG SHADY GROVE ROAD. ALL CUSTOMERS IRVING SYSTEM INTEGRITY SEPTEMBER 5281 080.75909 266,224 INSTALL 1,200 FEET OF 4 INCH, 1,000 FEET OF 2 INCH POLY ALONG SUMPTER AND N ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER 5282 080.75910 5,281 INSTALL 803 FEET OF 4 INCH AND 404 FEET OF 2 INCH POLY ALONG THE STREETS OF BOOT RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FREDERICKSBURG GROWTH SEPTEMBER 5283 080.75911 130,024 RELOCATE FACILITIES. INSTALL 680 FEET OF 4 INCH POLY ALONG KNOWLES DRIVE AND ABANDON 300 FEET OF 4 INCH AND 2,195 FEET OF 2 INCH POLY TO ACCOMODATE THE CITY OF SAGINAW IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209 ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY SEPTEMBER 5284 080.75915 103,423 INSTALL ERCON MATTING ALONG 6 INCH STEEL ON L29 (2ND) TO REMEDIATE EXPOSURE. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY SEPTEMBER 5285 080.75917 6,957 INSTALL 403 FEET OF 4 INCH AND 315 FEET OF 2 INCH POLY ALONG THE STREET OF BOOT RANCH SUBDIVISION. DEVELOPER INSTALL FACILITIES. RESIDENTIAL FREDERICKSBURG GROWTH SEPTEMBER 5286 080.75918 3,905 INSTALL 1,691 FEET OF 4 INCH POLY ALONG THE STREETS OF BOOT RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FREDERICKSBURG GROWTH DECEMBER 5287 080.75919 954,046 INSTALL 2,246 FEET OF 6 INCH, 145 FEET OF 4 INCH, 1,330 FEET OF 2 INCH POLY AND ABANDON 920 FEET OF 6 INCH, 190 FEET OF 4 INCH AND 820 FEET OF 2 INCH STEEL ALONG SANGER AVENUE FROM LAKE AIR DRIVE TO WESTVIEW DRIVE IN WACO, MCCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 5288 080.75921 19,388 INSTALL 75 FEET OF 2 INCH POLY ALONG OLD DENTON ROAD AND ABANDON 50 FEET OF 2 INCH POLY. ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY SEPTEMBER 5289 080.75922 191,294 INSTALL 435 FEET OF 4 INCH POLY ALONG ELM STREET AND ABANDON 300 FEET OF 4 INCH, 115 FEET OF 2 INCH AND 40 FEET OF 1.25 INCH STEEL AND 30 FEET OF 3 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209 ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY DECEMBER 5290 080.75924 184,047 INSTALL DISTRICT REGULATOR STATION #01 AND 90 FEET OF 4 INCH AND 90 FEET O ALL CUSTOMERS GLEN ROSE SYSTEM INTEGRITY DECEMBER 5291 080.75925 307,867 INSTALL 200 FEET OF 4 INCH AND 30 FEET OF 2 INCH POLY AND DISTRICT REGULAT ALL CUSTOMERS HAMILTON SYSTEM INTEGRITY SEPTEMBER 5292 080.75932 433,709 INSTALL 1,499 FEET OF 2 INCH POLY ALONG ATLAS DRIVE IN DENTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER 5293 080.75933 21,268 INSTALL 2,514 FEET OF 4 INCH AND 1,620 FEET OF 2 INCH POLY ALONG HIGH PLAINS DRIVE AND PHEASANT DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL NOLANVILLE GROWTH DECEMBER 5294 080.75934 14,854 INSTALL WAREHOUSE HEATERS AT THE SHERMAN SERVICE CENTER AT BLUE FLAME LANE. ALL CUSTOMERS SYSTEM WIDE STRUCTURES APRIL 5295 080.75937 1,660 INSTALL 660 FEET OF 4 INCH POLY ALONG K AVENUE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL PLANO GROWTH SEPTEMBER 5296 080.75943 6,287 PURCHASE A VALVE CHANGE TOOL KIT STANDARD FOR CORSICANA DISTRICT. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT JUNE 5297 080.75947 12,084 INSTALL 1,200 FEET OF 4 INCH, 775 OF 2 INCH POLY ALONG THE STREETS OF WATERFORD ESTATES SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER 5298 080.75948 2,703 INSTALL 4,300 FEET OF 2 INCH AND 720 FEET OF 4 INCH POLY ALONG THE STREETS OF GIDEON GROVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH APRIL 5299 080.75950 13,215 INSTALL 800 FEET OF 2 INCH POLY ALONG BEASLEY BOULEVARD (US HIGHWAY 59). DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL WHITEWRIGHT GROWTH DECEMBER 5300 080.75954 11,966 INSTALL 100 FEET OF 4 INCH ALONG BELMEADE DRIVE AND GOLDEN BEAR DRIVE AND ABANDON 100 FEET OF 4 INCH POLY. ALL CUSTOMERS CARROLLTON RELOCATION OF FACILITIES DECEMBER 5301 080.75955 47,078 PURCHASE 11 LAPTOPS, 20 RV55X MODEMS, 11 DOCKING STATIONS AND 1 MONITORS FOR THE NORTH REGION. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT JUNE 5302 080.75958 99,132 INSTALL 100 FEET OF 2 INCH POLY ALONG SKYLINE DRIVE IN THE CITY OF TROPHY CLUB. RESIDENTIAL TROPHY CLUB GROWTH SEPTEMBER 5303 080.75964 336,581 INSTALL 3,600 FEET OF 4 INCH AND 1,750 FEET OF 2 INCH POLY ALONG THE STREETS OF KREYMER ESTATES SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WYLIE GROWTH DECEMBER 5304 080.75965 64,116 INSTALL 3,225 FEET OF 2 INCH POLY ALONG THE STREETS OF WATERS EDGE SUBDIVISION IN ROBINSON. RESIDENTIAL ROBINSON GROWTH OCTOBER 5305 080.75966 395,292 RELOCATE FACILITIES. INSTALL 1,755 FEET OF 4 INCH POLY AND ABANDON 1,755 FEET OF 6 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5306 080.75967 258,797 RELOCATE FACILITIES. INSTALL 1,000 FEET OF 4 INCH AND 800 FEET OF 2 INCH POLY ALONG MILLET AVENUE AND ABANDON 1,725 FEET OF 4 INCH AND 200 FEET OF 6 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 5307 080.75968 973,065 INSTALL 3,100 FEET OF 8 INCH, 425 FEET OF 4 INCH, 255 FEET OF 2 INCH POLY AND ABANDON 3,000 FEET OF 6 INCH, 150 FEET OF 4 INCH POLY ALONG SOUTH CLARK ROAD IN CEDAR HILL, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO SYSTEM INTEGRITY DECEMBER 5308 080.75972 385,697 INSTALL 711 FEET OF 2 INCH POLY, 220 FEET OF 4 INCH AND 83 FEET OF 2 INCH STEEL AND ABANDON 418 FEET OF 2 INCH POLY, 85 FEET OF 4 INCH, 165 FEET OF 2 INCH STEEL ALONG FM 730 NEAR INTERSECTION OF EAST ROCK ISLAND IN BOYD, WISE COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD SYSTEM INTEGRITY DECEMBER 5309 080.75973 167,490 REPLACEMENTS FOR LAPTOP, MIC TRUCK RETROFIT DOCK & POWER SUPPLY FOR MCKINNEY SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT SEPTEMBER MTX Additions Page 153 of 178 372 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5310 080.75975 72,133 INSTALL 580 FEET OF 2 INCH POLY ALONG WOOD STREET IN WINTERS AND ABANDON 500 FEET OF 6 INCH STEEL AND 110 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WINTERS SYSTEM INTEGRITY NOVEMBER 5311 080.75976 124,518 INSTALL 470 FEET OF 6 INCH POLY ALONG NINTH STREET IN BALLINGER AND ABANCON 470 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY OCTOBER 5312 080.75978 25,709 INSTALL 1,066 FEET OF 2 INCH AND 218 FEET OF 4 INCH POLY ALONG THE STREETS OF MISSION RANCH SUBDIVISION. DEVELOP INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER 5313 080.75979 74,852 INSTALL A NEW TOWER IN MCKINNEY. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY SEPTEMBER 5314 080.75984 253,299 REPLACE WEST REGION LAPTOP AND TABLET COMPUTERS TO BE USED BY DIRECTORS/MANAGERS/SUPERVISORS/MIC/CONSTRUCTION AND SERVICE. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT DECEMBER 5315 080.75987 126,332 INSTALL TWO (2) 8 INCH STOPPLES AND FOUR (4) 2 INCH TOR TO REPAIR A LEAK ON LINE 232 IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY JULY 5316 080.75990 86,256 INSTALL 705 FEET OF 2 INCH POLY ALONG COLGATE AT LOMO ALTO IN DALLAS, DALLAS COUNTY. COMMERCIAL OR INDUSTRIAL DALLAS GROWTH DECEMBER 5317 080.75991 5,674 PURCHASE OF ONE (1) HEATH ODORATOR NATURAL GAS (OD1) FOR EASTLAND OFFICE ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT MARCH 5318 080.75992 286,632 REPLACE TABLET FOR THE WACO SERVICE CENTER, MODEMS FOR WACO, TEMPLE, GROESBECK AND KILLEEN SERVICE CENTER AND TRUCK DOCKS AND SUPPLIES. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT OCTOBER 5319 080.75994 136,190 INSTALL DISTRICT REGULATOR STATION #04, 885 FEET OF 4 INCH, 25 FEET OF 2 INC ALL CUSTOMERS WHITEWRIGHT SYSTEM INTEGRITY DECEMBER 5320 080.75996 68,467 INSTALL 6 TEST STATIONS AT FOREIGN LINE CROSSING IN STEPHENVILLE IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS DE LEON SYSTEM INTEGRITY SEPTEMBER 5321 080.76001 436,562 INSTALL 2,930 FEET OF 6 INCH AND 5,162 FEET OF 2 INCH POLY ALONG THE STREETS OF TAVOLO PARK SUBDIVISION IN FORT WORTH, TARRANT COUNTY. RESIDENTIAL FORT WORTH GROWTH DECEMBER 5322 080.76004 69,183 INSTALL 120 FEET OF 8 INCH POLY ALONG MOUNT VIEW AVENUE AND ABANDON 120 FEET OF 4 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 5323 080.76005 5,147 PURCHASE ONE (1) ELECTROFUSION PROCESSOR MSA 340 WITH CASE, SCANNER KIT, WITH BARCODE FROM GEORGE FISCHE CENTRAL PLASTICS TO BE KEPT AT ALTAMESA SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT MARCH 5324 080.76009 1,727 INSTALL 1,460 FEET OF 4 INCH, 250 FEET OF 2 INCH POLY ALONG RENNER ROAD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL RICHARDSON GROWTH DECEMBER 5325 080.76012 154,627 INSTALL 1,175 FEET OF 2 INCH AND 215 FEET OF 4 INCH POLY ALONG RYAN PLACE DRIVE AND ABANDON 1,065 FEET OF OF 3 INCH STEEL, 70 FEET OF 3 INCH AND 60 FEET OF 4 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 5326 080.76013 581,907 INSTALL 8,480 FEET OF 2 INCH, 3,195 FEET OF 4 INCH AND 2,380 FEET OF 6 INCH POLY ALONG THE STREETS OF ANNA CROSSING SUBDIVISION IN ANNA, COLLIN COUNTY. RESIDENTIAL ANNA GROWTH DECEMBER 5327 080.76014 43,774 FY2022 MID-CITIES COMPUTER REPLACEMENT TO INCLUDE 18 DELL LAPTOPS, 10 MONITORS, 55 MODEMS. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT SEPTEMBER 5328 080.76018 68,321 INSTALL 330 FEET OF 6 INCH POLY ALONG FM 2818 AND ABANDON 330 FEET OF 6 INCH POLY TO ACCOMODATE CITY OF COLLEGE STATION STREET PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY SEPTEMBER 5329 080.76019 23,765 INSTALL 1,415 FEET OF 2 INCH POLY ALONG LUBBOCK STREET AT BLIZZEL STREET . COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH AUGUST 5330 080.76024 122,222 INSTALL DISTRICT REGULATOR STATION #07 AND 70 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY ALONG NORTH WOOD STREET AND MEADOWBRIDGE STREET IN FERRIS AND ABANDON DISTRICT REGULATOR STATION #07 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FERRIS SYSTEM INTEGRITY DECEMBER 5331 080.76025 132,942 INSTALL DISTRICT REGULATOR STATION #01 40 FEET OF 2 INCH AND 40 FEET OF 4 INCH POLY ALONG SOUTH CHURCH STREET AND WEST 6TH STREET IN FERRIS AND ABANDON DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FERRIS SYSTEM INTEGRITY OCTOBER 5332 080.76026 101,942 INSTALL 575 FEET OF 4 INCH POLY ALONG THE ALLEY OF WALKER AND BOND STREET AND ABANDON 188 FEET OF 3 INCH STEEL AND 199 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER 5333 080.76027 873,297 INSTALL 1,370 FEET OF 6 INCH AND 1,951 FEET OF 2 INCH POLY AND ABANDON 1,352 FEET OF 8 INCH, 1,742 FEET OF 2 INCH AND 693 FEET OF 1.25 INCH STEEL ALONG RICHLAND DRIVE AND TENNYSON DRIVE IN WACO, MCCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 5334 080.76028 171,471 INSTALL 3,550 FEET OF 2 INCH, 1,550 FEET OF 4 INCH POLY ALONG THE STREETS OF OAK CREEK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH SEPTEMBER 5335 080.76029 1,381 INSTALL 5,460 FEET OF 2 INCH POLY ALONG THE STREETS OF TRAVIS RANCH MARINA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH DECEMBER 5336 080.76032 24,548 INSTALL 460 FEET OF 4 INCH POLY ALONG ELLISON STREET. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL BURLESON GROWTH SEPTEMBER 5337 080.76033 317 INSTALL 29 FEET OF 4 INCH POLY ALONG MURPHY STREET AND ABANDON 44 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY APRIL 5338 080.76039 1,016,852 INSTALL 2,750 FEET OF 2 INCH AND 835 FEET OF 4 INCH POLY ALONG MAYBETH IN DALLAS AND ABANDON 590 FEET OF 6 INCH, 2,755 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5339 080.76044 4,696 INSTALL 1,598 FEET OF 2 INCH POLY ALONG THE STREETS OF BRYSON SUBDIVISION IN LEANDER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER 5340 080.76045 5,854 INSTALL 2,216 FEET OF 2 INCH POLY ALONG THE STREETS OF BRYON SUBDIVISION IN LEANDER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER 5341 080.76047 97,399 INSTALL 340 FEET OF 2 INCH POLY ALONG WESTWOOD IN ABILENE AND ABANDON 130 FEET OF 3 INCH STEEL AND 70 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 5342 080.76052 285,550 INSTALL 375 FEET OF 4 INCH POLY ALONG HIGHWAY 84 AT JEWELL DRIVE AND ABANDON 375 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 5343 080.76055 9,437 INSTALL 50 FEET OF 2 INCH POLY ALONG WILSON AT DUVAL AND ABANDON 45 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY JUNE 5344 080.76056 194,315 INSTALL 4,025 FEET OF 2 INCH POLY ALONG THE STREETS OF AVALON AT ARGYLE SUBDIVISION IN ARGYLE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARGYLE GROWTH DECEMBER 5345 080.76064 471,842 INSTALL 1,545 FEET OF 4 INCH AND 13,110 FEET OF 2 INCH POLY ALONG THE STREETS OF STONEHILL SUBDIVISION IN CEDAR HILL, DALLAS COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CEDAR HILL GROWTH DECEMBER 5346 080.76065 32,292 INSTALL 625 FEET OF 4 INCH POLY ALONG WOODWAY DRIVE IN WOODWAY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS WOODWAY GROWTH DECEMBER 5347 080.76066 303,431 INSTALL 3,250 FEET OF 4 INCH, 2,539 FEET OF 2 INCH POLY ALONG THE STREETS OF SUMMERCREEK SUBDIVISION IN FORT WORTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER 5348 080.76076 22,924 INSTALL 2,475 FEET OF 4 INCH AND 8,665 FEET OF 2 INCH POLY ALONG THE STREETS OF HIDDEN LAKES ESTATES SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DESOTO GROWTH SEPTEMBER 5349 080.76085 280,239 INSTALL 1,430 FEET OF 2 INCH POLY ALONG HODDE STREET AND ABANDON 1,430 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER 5350 080.76087 86,232 INSTALL 65 FEET OF 4 INCH, 25 FEET OF 2 INCH POLY AND DISTRICT REGULATOR ST ALL CUSTOMERS BAIRD SYSTEM INTEGRITY SEPTEMBER 5351 080.76088 307,446 INSTALL 370 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #16 ALONG THE STREETS OF ABILENE AND ABANDON 162 FEET OF 4 INCH AND 10 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION #16 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER MTX Additions Page 154 of 178 373 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5352 080.76089 119,634 INSTALL 165 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #28 ALONG THE STREETS OF ABILENE AND ABANDON 20 FEET OF 2 INCH, 180 FEET OF 4 INCH AND DISTRICT REGULATOR STATION #28 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 5353 080.76093 705,367 INSTALL 2,225 FEET OF 2 INCH POLY ALONG RAYNELLE STREET IN DALLAS AND ABANDON 2,225 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5354 080.76098 1,070,422 INSTALL 1,400 FEET OF 6 INCH, 20 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY ALONG HALL STREET IN DALLAS AND ABANDON 1,375 FEET OF 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5355 080.76101 121,404 INSTALL DISTRICT REGULATOR STATION #05, 290 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG SOUTH MABEL STREET AND 8TH STREET IN FERRIS AND ABANDON DISTRICT REGULATOR STATON #05 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FERRIS SYSTEM INTEGRITY OCTOBER 5356 080.76107 405,578 INSTALL DISTRICT REGULATOR STATION #47 ALONG IH35E AND TEASLEY ROAD AND ABANDON DISTRICT REGULATOR STATION #47. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER 5357 080.76108 34,798 INSTALL 350 FEET OF 2 INCH POLY ALONG SILVER SAGE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WICHITA FALLS GROWTH OCTOBER 5358 080.76109 303,859 INSTALL 2,675 FEET OF 4 INCH, 2,215 FEET OF 2 INCH POLY ALONG THE STREETS OF PIONEER POINT SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER 5359 080.76110 338,587 INSTALL 20 FEET OF 6 INCH, 10 FEET OF 2 INCH STEEL AND ABANDON 20 FEET OF 6 INCH AND 10 FEET OF 2 INCH STEEL AT THE AMAZON WAREHOUSE IN FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE 5360 080.76111 128,768 INSTALL 950 FEET OF 2 INCH POLY ALONG JOLINE AND AVENUE K AND ABANDON 1,005 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 5361 080.76120 125,759 INSTALL DISTRICT REGULATOR STATION #02 AND 40 FEET OF 4 INCH POLY ALONG CAMPUS STREET AND EAST 5TH STREET IN FERRIS AND ABANDON DISTRICT REGULATOR STATION #02 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FERRIS SYSTEM INTEGRITY DECEMBER 5362 080.76121 61,943 INSTALL 400 FEET OF 2 INCH POLY ALONG WEST LANE AND ABANDON 400 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL SYSTEM INTEGRITY SEPTEMBER 5363 080.76122 106,905 INSTALL 676 FEET OF 4 INCH AND 15 FEET OF 2 INCH POLY ALONG BROCKETT STREET AND ABANDON 601 FEET OF 3 INCH STEEL AND 77 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLINSVILLE SYSTEM INTEGRITY SEPTEMBER 5364 080.76124 3,096 INSTALL CONSOLE FOR LAPTOP IN TRUCK FOR GREENVILLE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT JUNE 5365 080.76129 18,850 INSTALL 140 FEET OF 2 INCH POLY ALONG WEST DAY STREET. RESIDENTIAL DENISON GROWTH JUNE 5366 080.76132 353,539 INSTALL 6,445 FEET OF 4 INCH POLY ALONG THE STREETS OF HOMESTEAD DANIEL FARMS SUBDIVISION IN DESOTO, DALLAS COUNTY. RESIDENTIAL DESOTO GROWTH DECEMBER 5367 080.76138 122,245 INSTALL 40 FEET OF 2 INCH, 160 FEET OF 4 INCH POLY AND DISTRICT REGULATOR S ALL CUSTOMERS PALMER SYSTEM INTEGRITY SEPTEMBER 5368 080.76140 115,590 INSTALL 40 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY AND DISTRICT REGULATOR ST ALL CUSTOMERS PALMER SYSTEM INTEGRITY DECEMBER 5369 080.76141 525,530 INSTALL 1,200 FEET OF 4 INCH, 1,140 FEET OF 2 INCH ALONG FOREST TRAIL AND PALMETTO DRIVE IN TEMPLE AND ABANDON 2,250 FEET OF 2 INCH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER 5370 080.76143 844,704 INSTALL 1,255 FEET OF 6 INCH, 2,245 FEET OF 4 INCH ALONG WESTMORELAND IN DALLAS AND ABANDON 1,210 FEET OF 6 INCH, 360 FEET OF 4 INCH, 1,796 FEET OF 3 INCH, AND 338 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5371 080.76144 5,799 INSTALL 62 FEET OF 2 INCH POLY ALONG ROSWELL AVENEUE. RESIDENTIAL GRANGER GROWTH JULY 5372 080.76145 364,836 INSTALL 1,300 FEET OF 6 INCH AND 60 FEET OF 2 INCH POLY ALONG OVERTON STREET AND ABANDON 1,300 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5373 080.76149 446,496 INSTALL 1,900 FEET OF 2 INCH POLY ALONG THE ALLEY BETWEEN EAST ELM STREE ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY DECEMBER 5374 080.76150 181,499 INSTALL 1,850 FEET OF 2 INCH POLY ALONG LEONARD STREET AND ABANDON 500 FEET OF 2 INCH POLY AND 1,225 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL SYSTEM INTEGRITY SEPTEMBER 5375 080.76151 415,262 INSTALL 1,065 FEET OF 2 INCH, 25 FEET OF 4 INCH, 1,210 FEET OF 6 INCH POLY ALO ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 5376 080.76154 20,384 INSTALL 350 FEET OF 2 INCH POLY ALONG BATAAN AND BEDFORD, RESIDENTIAL DALLAS GROWTH SEPTEMBER 5377 080.76160 23,050 INSTALL TWO (2) INCH MOONEY REGULATORS ON MCKINNEY DISTRICT REGULATOR STATION #04 AND ABANDON TWO (2) 1 INCH MOONEY REGULATOR TO INCREASE CAPACITY. ALL CUSTOMERS MCKINNEY SYSTEM IMPROVEMENT JUNE 5378 080.76161 74,761 INSTALL 300 FEET OF 2 INCH POLY ALONG GEORGE AVENUE AND ABANDON 280 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL SYSTEM INTEGRITY JUNE 5379 080.76166 110,271 INSTALL 350 FEET OF 4 INCH POLY ALONG HIGHLAND DRIVE AND ABANDON 340 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY JULY 5380 080.76168 128,693 INSTALL LAPTOPS, MIC TRUCK RETROFIT DOCK AND POWERSUPPLY, MODEM AND DOCKING STATIONS IN FORT WORTH SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT NOVEMBER 5381 080.76173 15,719 INSTALL 770 FEET OF 2 INCH POLY ALONG THE STREETS OF THE OAKS AT TOWER RIDGE SUBDIVISION IN CORINTH, DENTON COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CORINTH GROWTH DECEMBER 5382 080.76174 5,006 INSTALL 2 SNESIT GOLD LEAK DETECTORS IN WAXAHACHIE. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT MARCH 5383 080.76176 8,596 INSTALL 110 FEET OF 2 INCH POLY ALONG ELOISE STREET IN THE CITY OF CALDWELL. RESIDENTIAL CALDWELL GROWTH JUNE 5384 080.76178 2,340 INSTALL 320 FEET OF 2 INCH POLY ALONG SOUTH COOPER STREET. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL ARLINGTON GROWTH SEPTEMBER 5385 080.76179 1,526 PURCHASE NETWORK UNINTERRUPTABLE POWER SUPPLY (UPS) FOR WEST REGION - SWEETWATER OFFICE. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT JUNE 5386 080.76180 283,910 REPLACE 4 LAPTOPS, 76 DELL RUGGED LAPTOPS, 76 TRUCK WITH POWER SUPPLY, 50 DOCKS IN DALLAS ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT DECEMBER 5387 080.76182 3,913 RELOCATE FACILITIES. INSTALL 150 FEET OF 2 INCH POLY TO ALONG KNOLL DRIVE NEAR CRESTWAY DRIVE. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER 5388 080.76183 101,145 REPLACE LAPTOPS IN ATHENS SERVICE CENTER, GARLAND SERVICE CENTER AND LONGVIEW SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT NOVEMBER 5389 080.76187 341,515 INSTALL 2,243 FEET OF 4 INCH AND 2,039 FEET OF 2 INCH POLY ALONG THE STREETS OF CHISHOLM HILLS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CLEBURNE GROWTH OCTOBER 5390 080.76189 38,966 INSTALL 80 FEET OF 2 INCH POLY AND ABANDON 80 FEET OF 2 INCH POLY ALONG TIMBERVIEW STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY JUNE 5391 080.76192 146,608 INSTALL 550 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #13 ALONG ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER 5392 080.76194 74,143 INSTALL 750 FEET OF 2 INCH POLY ALONG OAKHURST SCENIC DRIVE. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER 5393 080.76198 612,159 INSTALL 2,113 FEET OF 6 INCH POLY ALONG MYRTA STREET AND WHELESS AVENUE ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY DECEMBER 5394 080.76199 469,406 INSTALL 1,903 FEET OF 2 INCH POLY IN ALLEY BETWEEN WHELESS AVENUE AND PRESCOTT STREET AND 442 FEET OF 4 INCH POLY ALONG OAKS STREET IN KERRVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER 5395 080.76200 387,211 INSTALL 2,397 FEET OF 2 INCH POLY ALONG MOORE STREET AND IN ALLEY BETWEEN WASHINGTON STREET AND OAK STREET IN KERRVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY DECEMBER 5396 080.76201 359,788 INSTALL 2,607 FEET OF 2 INCH POLY ALONG E. MAIN STREET, JEFFERSON STREET AND ARANSAS STREET IN KERRVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY DECEMBER 5397 080.76202 460,957 INSTALL 2,007 FEET OF 4 INCH POLY ALONG LYTLE STREET AND JEFFERSON STREET AND 662 FEET OF 2 INCH POLY ALONG 1ST STREET IN KERRVILLE, KERR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY DECEMBER MTX Additions Page 155 of 178 374 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5398 080.76205 205,242 INSTALL 1,762 FEET OF 2 INCH POLY AND ABANDON 1,443 FEET OF 2 INCH STEEL ALONG CHAMBERLAIN STREET IN IRVING IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER 5399 080.76210 10,458 INSTALL 772 FEET OF 4 INCH POLY ALONG SOUTH FREEWAY. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH JULY 5400 080.76216 757,218 INSTALL 8,160 FEET OF 2 INCH, 1,905 FEET OF 4 INCH AND 1,910 FEET OF 12 INCH POLY ALONG THE STREETS OF WINDROSE SUBDIVISION IN PILOT POINT. RESIDENTIAL PILOT POINT GROWTH DECEMBER 5401 080.76217 526,875 INSTALL 2,160 FEET OF 2 INCH POLY ALONG EMBERWOOD AND FAIRWOOD AND ABANDON 2,110 FEET OF 3 INCH STEEL AND 100 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5402 080.76230 14,291 INSTALL 1,000 FEET OF 4 INCH POLY ALONG REDBUD BOULEVARD IN MCKINNEY. COMMERCIAL OR INDUSTRIAL MCKINNEY GROWTH SEPTEMBER 5403 080.76234 6,346 INSTALL 1,579 FEET OF 2 INCH POLY ALONG THE STREETS OF STONE RIDGE SUBDIVISION IN FREDERICKSBURG. RESIDENTIAL FREDERICKSBURG GROWTH OCTOBER 5404 080.76235 1,621 PURCHASE A DIGITAL LOCATOR MARKER BALL FOR THE SAN ANGELO C & M DISTRICT. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT JUNE 5405 080.76242 19,681 PURCHASE AND INSTALL NEW CARD READER ON FRONT EXTERIOR DOOR OF MCKINNEY SERVICE CENTER ALONG CORPORATE DRIVE. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER 5406 080.76243 3,855 INSTALL 600 FEET OF 4 INCH POLY ALONG TXDOT NE LOOP 820 SERVICE ROAD IN NORTH RICHLAND HILLS. COMMERCIAL OR INDUSTRIAL NORTH RICHLAND HILLS GROWTH SEPTEMBER 5407 080.76248 16,073 INSTALL 1 REGULATOR AND ABANDON 1 REGULATOR AT WESTLAKE CITY GATE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY JULY 5408 080.76249 21,955 INSTALL 4,800 FEET OF 2 INCH POLY ALONG THE STREETS OF CAMEY PLACE SUBDIVISION. RESIDENTIAL THE COLONY GROWTH OCTOBER 5409 080.76250 760,269 INSTALL 2,170 FEET OF 2 INCH , 330 FEET OF 4 INCH POLY IN THE ALLEY BETWEEN F ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5410 080.76252 248,138 INSTALL 1,080 FEET OF 4 INCH AND 4,750 FEET OF 2 INCH POLY ALONG THE STREETS OF TRAILS OF ELIZABETH CREEK SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER 5411 080.76256 229,841 RELOCATE FACILITIES. INSTALL 65 FEET OF 2 INCH AND 1,050 FEET OF 4 INCH POLY ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY DECEMBER 5412 080.76258 130,172 INSTALL 5,200 FEET OF 2 INCH POLY ALONG THE STREETS OF RIDGE PARK ESTATES SUBDIVISION IN ROYSE CITY, ROCKWALL COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH DECEMBER 5413 080.76259 53,940 INSTALL 850 FEET OF 4 INCH POLY ALONG MARY DRIVE AND WILLOW STREET IN HURST AND ABANDON 786 FEET OF 4 INCH STEEL AND 34 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY OCTOBER 5414 080.76260 295,589 INSTALL 430 FEET OF 2 INCH AND 1,230 FEET OF 6 INCH POLY ALONG BUENA VISTA DRIVE IN HURST AND ABANDON 501 FEET OF 1.25 INCH POLY AND 1,800 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 5415 080.76262 212,109 INSTALL 1,480 FEET OF 2 INCH POLY ALONG WEST CEDAR STREET AND ABANDON 1,436 FEET OF 2 INCH POLY AND 19 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 5416 080.76263 278,380 INSTALL 1,655 FEET OF 4 INCH POLY ALONG WEST OAK STREET AND ABANDON 16 FEET OF 2 INCH, 87 FEET OF 4 INCH STEEL AND 967 FEET OF 2 INCH, 20 FEET OF 3 INCH, AND 9 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 5417 080.76264 355,480 INSTALL 2,155 FEET OF 4 INCH POLY ALONG NORWOOD DRIVE AND EAST OAK DRIV ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 5418 080.76265 331,537 INSATLL 1,534 FEET OF 4 INCH POLY ALONG NORWOOD DRIVE IN HURST AND ABANDON 609 FEET OF 4 INCH POLY AND 1,340 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 5419 080.76266 431,105 INSTALL 1,900 FEET OF 6 INCH POLY ALONG WILLOW STREET AND HARRISON LANE ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 5420 080.76267 234,803 ISNTALL 1,500 FEET OF 6 INCH POLY ALONG HARRISON LANE AND REDBUD DRIVE IN ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 5421 080.76268 200,536 INSTALL 1,293 FEET OF 2 INCH POLY ALONG ELM STREET IN HURST AND ABANDON 1,229 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 5422 080.76269 195,046 INSTALL 1,250 FEET OF 4 INCH POLY ALONG PECAN STREET IN HURST AND ABANDON 12 FEET OF 4 INCH STEEL AND 1,307 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 5423 080.76270 253,367 ISNTALL 1,765 FEET OF 2 INCH POLY ALONG SOUDER DRIVE AND HARMON ROAD IN HURST AND ABANDON 1,773 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 5424 080.76293 75,466 INSTALL 43 FEET OF 4 INCH AND 2 FEET OF 4 INCH ALONG WEST WHITE STREET AT SOUTH WASHINGTON STREET AND ABANDON 35 FEET OF 4 INCH AND 5 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PILOT POINT SYSTEM INTEGRITY SEPTEMBER 5425 080.76315 816,741 INSTALL 2,450 FETT OF 6 INCH, 350 FEET OF 2 INCH POLY ALONG BARDFIELD AVENUE ALLEY FROM KEYSTONE STREET TO SEQUOIA DRIVE AND ABANDON 2,450 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5426 080.76330 258,966 INSTALL 1,170 FEET OF 6 INCH POLY ALONG BARDFIELD AVENUE ALLEY FROM SEQUOIA DRIVE TO CENTERVILLE ROAD IN GARLAND AND ABANDON 1,170 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5427 080.76332 573,631 INSTALL 2,680 FEET OF 2 INCH POLY ALONG KEYSTONE STREET FROM BARDFIELD AVENUE TO SHADWELL DRIVE AND ABANDON 2,150 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5428 080.76335 1,074,902 INSTALL 2,450 FEET OF 2 INCH POLY ALONG KAZAK STREET FROM BARDFIELD AVENUE TO SHADWELL DRIVE AND ABANDON 2,430 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5429 080.76338 744,348 INSTALL 3,000 FEET OF 2 INCH POLY ALONG KEELE DRIVE FROM BARDFIELD AVENUE TO SHADWELL DRIVE IN GARLAND AND ABANDON 2,430 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5430 080.76339 275,799 INSTALL 2,085 FEET OF 2 INCH POLY AND ABANDON 1,100 FEET OF 2 INCH POLY ALONG BARDFIELD AVENUE FROM NIAGARA STREET TO CENTERVILEE ROAD IN GARLAND IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER 5431 080.76343 353,748 INSTALL 2,070 FEET OF 2 INCH POLY ALONG NIAGARA STREET FROM CANDLEWOOD LANE TO BARDFIELD AVENUE IN GARLAND AND ABANDON 1,320 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5432 080.76346 225,183 INSTALL 920 FEET OF 2 INCH POLY ALONG SEQUOIA DRIVE FROM NIAGARA STREET TO BARDFIELD AVENUE IN GARLAND AND ABANDON 900 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5433 080.76347 215,799 INSTALL 1,210 FEET OF 2 INCH POLY ALONG CASHMERE DRIVE FROM NIAGARA STREET TO BARDFIELD AVENUE IN GARLAND AND ABANDON 1,200 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER 5434 080.76349 434,385 INSTALL 1,110 FEET OF 2 INCH POLY ALONG MAYFIELD AVENUE FROM KEELE DRIVE TO CANDLEWOOD LANE IN GARLAND AND ABANDON 750 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5435 080.76350 206,964 INSTALL 1,270 FEET OF 2 INCH POLY ALONG CANDLEWOOD LANE FROM MAYFIELD AVENUE TO BARDFIELD AVENUE IN GARLAND AND ABANDON 1,300 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5436 080.76352 35,064 INSTALL 600 FEET OF 2 INCH POLY ALONG BEASON STREET. RESIDENTIAL BRYAN GROWTH SEPTEMBER 5437 080.76353 17,684 PURCHASE AND INSTALL CARD READER FOR NORTH GATE AT HILLSBORO FOR SAFETY CONCERNS DUE TO ADDED TRAFFIC. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JULY MTX Additions Page 156 of 178 375 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5438 080.76354 366,244 INSTALL 2,850 FEET OF 4 INCH POLY ALONG THE STREETS OF COLLINSVILLE AND ABANDON 1,630 FFET OF 3 INCH STEEL, 320 FEET OF 3 INCH AND 218 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLINSVILLE SYSTEM INTEGRITY DECEMBER 5439 080.76355 11,564 REPLACE THE TEN YEAR OLD IRREPARABLE PLOTTER AT THE BRYAN SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT JUNE 5440 080.76356 436,373 INSTALL 1,780 FEET OF 2 INCH POLY ALONG BRAEMAR DRIVE AND ABANDON 1,600 FEET OF 2 INCH STEEL AND 195 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER 5441 080.76358 6,701 INSTALL 1,531 FEET OF 4 INCH POLY ALONG THE STREETS OF BOOT RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FREDERICKSBURG GROWTH DECEMBER 5442 080.76359 4,099 INSTALL 975 FEET OF 2 INCH AND 815 FEET OF 4 INCH ALONG THE STREETS OF BOOT RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL UNINCORPORATED GROWTH SEPTEMBER 5443 080.76360 53,683 INSTALL 1,115 FEET OF 4 INCH AND 1,106 FEET OF 2 INCH POLY ALONG THE STREETS OF BOOT RANCH SUBDIVISION. DEVELOPER INSTALLED FACILTITIES. RESIDENTIAL FREDERICKSBURG GROWTH SEPTEMBER 5444 080.76364 (1,880) INSTALL 80 FEET OF 4 INCH POLY AND ABANDON 60 FEET OF 4 INCH POLY ASSOCIATED WITH A UTILITY CONFLICT. ALL CUSTOMERS WILMER RELOCATION OF FACILITIES NOVEMBER 5445 080.76366 389,033 INSTALL 3,295 FEET OF 4 INCH AND 3,900 FEET OF 2 INCH POLY ALONG THE STREETS OF BAILEY PARK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER 5446 080.76368 11,946 INSTALL 100 FEET OF 2 INCH POLY ALONG GOOD JOHN STREET. RESIDENTIAL COLLINSVILLE GROWTH JULY 5447 080.76370 71,044 INSTALL 20 FEET OF 6 INCH STEEL ALONG HK DODGEN LOOP IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY JUNE 5448 080.76371 295,418 INSTALL 3,277 FEET OF 2 INCH AND 1,375 FEET OF 6 INCH POLY ALONG THE STREETS OF DURANGO FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH DECEMBER 5449 080.76375 154,844 INSTALL DISTRICT REGULATOR STATION #01, 80 FEET OF 4 INCH POLY BETWEEN WEST 3RD STREET AND 2ND STREET IN VENUS AND ABANDON DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VENUS SYSTEM INTEGRITY DECEMBER 5450 080.76376 740,192 INSTALL 182 SUSL ALONG STREETS IN DUNCANVILLE IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY SEPTEMBER 5451 080.76378 57,042 INSTALL 215 FEET OF 4 INCH POLY ALONG SPEEDWAY AND MARIE AND ABANDON 215 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 5452 080.76379 777,254 RELOCATE FACILITIES. INSTALL 1,233 FEET OF 2 INCH AND 2,000 FEET OF 4 INCH PO ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY DECEMBER 5453 080.76380 4,245 INSTALL 1,150 FEET OF 4 INCH AND 5,370 FEET OF 2 INCH POLY ALONG THE STREETS OF FOX HOLLOW SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH DECEMBER 5454 080.76382 360,154 INSTALL 1,159 FEET OF 6 INCH, 196 FEET OF 4 INCH AND 735 FEET OF 2 INCH POLY ALONG WEST CENTRAL AND ABANDON 1,949 FEET OF 2 INCH STEEL AND 160 FEET OF 3 INCH POLY IN GEORGETOWN, WILLIAMSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY DECEMBER 5455 080.76385 1,486 PURCHASE ONE 4-STROKE GAS CONCRETE SAW FOR THE SWEETWATER DISTRICT. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT APRIL 5456 080.76390 819,509 INSTALL 2,325 FEET OF 6 INCH POLY ALONG BROCKBANK NORTH OF WALNUT HILL IN DALLAS AND ABANDON 2,325 FEET OF 6 INCH STEEL AND 10 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5457 080.76392 2,395 PURCHASE DELL LATITUDE 9520, XCTO. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT MARCH 5458 080.76394 40,437 INSTALL 800 FEET OF 4 INCH POLY ALONG JOHN CARPENTER FREEEWAY IN IRVING. ALL CUSTOMERS IRVING GROWTH DECEMBER 5459 080.76398 3,595 INSTALL 4,600 FEET OF 2 INCH POLY ALONG THE STREETS OF RIDGE LAKE SUBDIVISION IN HEATH, ROCKWALL COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HEATH GROWTH DECEMBER 5460 080.76402 344,595 INSTALL 1,785 FEET OF 2 INCH POLY ALONG WHIRLAWAY NEAR HARWICH IN DALLAS AND ABANDON 1,785 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5461 080.76405 2,097 INSTALL 60 FEET OF 2 INCH POLY ALONG DOGWOOD DRIVE AND ABANDON 45 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY SEPTEMBER 5462 080.76407 15,867 ISNTALL 3,240 FEET OF 4 INCH AND 4,760 FEET OF 2 INCH POLY ALONG THE STREETS OF SENDERA RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER 5463 080.76408 31,141 INSTALL 871 FEET OF 2 INCH POLY ALONG LEXINGTON PARKS SUBDIVISION IN FRISCO. RESIDENTIAL FRISCO GROWTH SEPTEMBER 5464 080.76419 294,677 INSTALL 2,030 FEET OF 2 INCH AND 60 FEET OF 6 INCH POLY ALONG YUMA AND PHOENIX STREETS AND ABANDON 1,010 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 5465 080.76420 392,589 INSTALL 1,650 FEET OF POLY ALONG COVINGTON IN WICHITA FALLS AND ABANDON 1,895 FEET OF STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 5466 080.76421 220,534 INSTALL 1,425 FEET OF 2 INCH POLY ALONG YUMA AND GUNNISON IN WICHITA FALLS AND ABANDON 825 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 5467 080.76422 145,645 INSTALL 1,350 FEET OF 2 INCH POLY ALONG CLOVIS AND RUIDOSA IN WICHITA FALLAS AND ABANDON 865 FEET OF 2 INCH AND 1,020 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 5468 080.76423 82,925 PURCHASE 5430 RUGGED LAPTOPS ALONG WITH ASSOCIATED ACCESSORIES FOR DENTON. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT JULY 5469 080.76425 356,779 INSTALL 75 FEET OF 4 INCH POLY ALONG HORNE STREET, 450 FEET OF 2 INCH POLY ALONG CARVER DRIVE AND HELMICK AVENUE AND ABANDON 450 FEET OF 3 INCH STEEL AND 30 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5470 080.76426 240,377 INSTALL 1,890 FEET OF 2 INCH POLY ALONG RUIDOSA AND YUMA IN WICHITA FALLS AND ABANDON 1,614 FEET OF 2 INCH AND 133 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 5471 080.76427 7,653 INSTALL 2,065 FEET OF 2 INCH POLY ALONG THE STREETS OF WILCO RANCH SUBDIVISION IN HUTTO. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH DECEMBER 5472 080.76428 139,314 INSTALL 630 FEET OF 2 INCH POLY ALONG YUMA AND GUNNISON IN WICHITA FALLS AND ABANDON 510 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 5473 080.76429 167,517 INSTALL 1,435 FEET OF 2 INCH POLY ALONG SHASTA AND GUNNISON IN WICHITA FALLS AND ABANDON 454 FEET OF 2 INCH AND 453 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 5474 080.76430 422,836 INSTALL 565 FEET OF 2 INCH AND 1,120 FEET OF 6 INCH POLY AND ABANDON 1,087 FEET OF 6 INCH, AND 626 FEET OF 2 INCH STEEL ALONG TUCSON AND SKYLINE IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 5475 080.76431 252,664 INSTALL 95 FEET OF 2 INCH AND 1,220 FEET OF 6 INCH POLY AND ABANDON 936 FEET OF 6 INCH, 522 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG PHOENIX AND SHASTA IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 5476 080.76433 9,165 INSTALL 212 FEET OF 8 INCH, 235 FEET OF 4 INCH, AND 2,687 FEET OF 2 INCH POLY ALONG THE STREETS OF COTTAGES AT PARMER RANCH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH OCTOBER 5477 080.76434 145,245 INSTALL DISTRICT REGULATOR STATION #04, 40 FEET OF 2 INCH, AND 80 FEET OF 4 ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY DECEMBER 5478 080.76435 340,855 IMPLEMENT AT&T MPLS CIRCUITS FOR EACH OF THE 23 CONTROL WAVE MASTERS IN THE MDTX SERVICE CENTERS. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT DECEMBER 5479 080.76440 217 INSTALL DISTRICT REGULATOR STATION #18 AND 1,300 FEET OF 2 INCH POLY ALONG NE 36TH AND EAST MAIN IN GRAND PRAIRIE AND ABANDON DISTRICT REGULATOR STATION #18, 400 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY DECEMBER MTX Additions Page 157 of 178 376 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5480 080.76448 3,119 CHANGE FLOURESCENT BULBS WITH LED BULBS AT THE BROWNWOOD SERVICE CENTER WAREHOUSE. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JULY 5481 080.76451 535,933 INSTALL 3,245 FEET OF 2 INCH POLY INTHE ALLEY OF CARRY IN DALLAS AND ABANDON 2,505 FEET OF 2 INCH, 710 FEET OF 3 INCH STEEL AND 30 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5482 080.76458 712,363 INSTALL 960 FEET OF 12 INCH POLY ALONG SOUTH 2ND STREET AND GURLEY IN WACO AND ABANDON 960 FEET OF 12 STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 5483 080.76460 22,329 INSTALL 984 FEET OF 8 INCH AND 3,634 FEET OF OF 2 INCH POLY ALONG THE STREETS OF PARKSIDE ON THE RIVER SUBDIVISION IN GEORGETOWN, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER 5484 080.76461 669,003 INSTALL 2,945 FEET OF 2 INCH POLY ALONG THE ALLEY OF WHIRLAWAY NEAR DALE CREST IN DALLAS AND ABANDON 2,600 FEET OF 2 INCH STEEL AND 345 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5485 080.76462 29,539 INSTALL 1,386 FEET OF 8 INCH, 456 FEET OF 4 INCH AND 4,466 FEET OF 2 INCH POLY ALONG THE STREETS OF PARKSIDE ON THE RIVER SUBDIVISION IN GEORGETOWN, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER 5486 080.76468 58,201 INSTALL 175 FEET OF 2 INCH POLY ALONG FEATHERSTONE DRIVE AND ABANDON 110 FEET OF 2 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE 5487 080.76469 513,850 INSTALL 6,596 FEET OF 2 INCH, 1,205 FEET OF 4 INCH AND 1,476 FEET OF 12 INCH POLY ALONG THE STREETS OF HONEY CREEK SUBDIVISION IN MCKINNEY. RESIDENTIAL MCKINNEY GROWTH DECEMBER 5488 080.76470 23,266 INSTALL 6,310 FEET OF 2 INCH AND 1,083 FEET OF 4 INCH POLY ALONG THE STREETS OF COTTAGES SUBDIVISION IN CELINA, COLLIN COUNTY. RESIDENTIAL CELINA GROWTH DECEMBER 5489 080.76472 273,279 INSTALL 3,500 FEET OF 2 INCH AND 3,700 FEET OF 4 INCH POLY ALONG THE STREETS OF ARCADIA TRAILS SUBDIVISION IN BALCH SPRINGS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BALCH SPRINGS GROWTH DECEMBER 5490 080.76473 262,054 INSTALL DISTRICT REGULATOR STATION #01 AND 30 FEET OF 2 INCH AND 100 FEET ALL CUSTOMERS MUENSTER SYSTEM INTEGRITY DECEMBER 5491 080.76478 6,006 INSTALL 170 FEET OF 4 INCH AND ABANDON 170 FEET OF 2 INCH ALONG CEDARDALE ROAD IN DALLAS. ALL CUSTOMERS DALLAS SYSTEM IMPROVEMENT SEPTEMBER 5492 080.76481 53,165 RELOCATE FACILITIES. INSTALL 80 FEET OF 2 INCH POLY ALONG CHERRY STREET AND ABANDON 80 FEET OF 2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY JUNE 5493 080.76482 283,826 INSTALL 1,930 FEET FO 2 INCH, 120 FEET OF 4 INCH AND 1,440 FEET OF 6 INCH POLY ALONG THE STREETS OF TRADITION SUBDIVISION IN FORT WORTH, DENTON COUNTY. RESIDENTIAL FORT WORTH GROWTH DECEMBER 5494 080.76483 130,173 RELOCATE FACILITIES. INSTALL 225 FEET OF 2 INCH AND 725 FEET OF 4 INCH POLY ALL CUSTOMERS EVERMAN SYSTEM INTEGRITY SEPTEMBER 5495 080.76490 243,645 INSTALL 440 FEET OF 4 INCH POLY ALONG AVE A AND 10TH NE AND ABANDON 440 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY DECEMBER 5496 080.76491 70,976 INSTALL LINE D GROUNDBED AND RECTIFIER AT 4911+17 AND ABANDON LINE D GROUNDBED AND RECTIFIER IN ARLINGTON, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER 5497 080.76492 102,091 INSTALL 1,000 FEET OF 8 INCH, 6,550 FEET OF 6 INCH, 4,895 FEET OF 4 INCH POLY ALONG THE STREETS OF SAPPHIRE BAY SUBDIVISION IN ROWLETT. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL ROWLETT GROWTH DECEMBER 5498 080.76496 304,616 INSTALL 425 FEET OF 2 INCH POLY AND ABANDON 420 FEET OF 2 INCH STEEL ALONG SHILOH STREET IN GARLAND, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5499 080.76498 557,151 INSTALL 1,473 FEET OF 6 INCH POLY AND ABANDON 1,477 FEET OF 2 INCH STEEL ALONG EAST HICKORY HILL ROAD IN ARGYLE, DENTON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARGYLE SYSTEM INTEGRITY DECEMBER 5500 080.76501 12,862 PROVIDE AND INSTALL 12'X12' CHI ROLLING STEEL DOOR WITH OPERATOR INSPECTION TRAINING WAREHOUSE. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JUNE 5501 080.76504 (17,070) RELOCATE FACILITIES. INSTALL 600 FEET OF 6 INCH POLY ALONG HARRIS RIDGE BOULEVARD AND JOHN HENRY FAULK DRIVE IN PFLUGERVILLE AND ABANDON 700 FEET OF 6 INCH POLY. ALL CUSTOMERS PFLUGERVILLE RELOCATION OF FACILITIES DECEMBER 5502 080.76508 178,087 INSTALL 640 FEET OF 8 INCH POLY ALONG EDGEWOOD TERRACE AND ABANDON 640 FEET OF 8 INCH STEEL TO ACCOMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 5503 080.76509 114,949 INSTALL 850 FEET OF 2 INCH POLY ALONG SIMMONS DRIVE AND ABANDON 798 FEET OF 4 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 5504 080.76510 434,957 INSTALL 1,887 FEET OF 2 INCH, 1,013 FEET OF 4 INCH, 256 FEET OF 6 INCH POLY ALO ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY OCTOBER 5505 080.76511 500,128 INSTALL 1,629 FEET OF 2 INCH, 1,150 FEET OF 6 INCH POLY ALONG MAIN STREET IN MADISONVILLE AND ABANDON 815 FEET OF 4 INCH, 1,095 FEET OF 2 INCH POLY AND 750 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY DECEMBER 5506 080.76513 627,693 INSTALL 943 FEET OF 4 INCH, 2,689 FEET OF OF 2 INCH POLY. ABANDON 556 FEET OF 3 INCH, 1,303 FEET OF 2 INCH STEEL AND 263 FEET OF 3 INCH AND 756 FEET OF 2 INCH POLY ALONG MAY STREET IN MADISONVILLE, MADISON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY DECEMBER 5507 080.76514 520,141 INSTALL 378 FEET OF 2 INCH, 98 FEET OF 4 INCH, 1,960 FEET OF 6 INCH POLY AND ABANDON 98 FEET OF 4 INCH POLY, 1.972 FEET OF 4 INCH STEEL ALONG MAIN STREET IN MADISONVILLE, MADISON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY DECEMBER 5508 080.76515 417,777 INSTALL 2,032 FEET OF 2 INCH, 1,003 FEET OF 6 INCH POLY AND ABANDON 1,324 FEET OF 2 INCH, 526 FEET OF 4 INCH STEEL AND 406 FEET OF 2 INCH, 468 FEET OF 4 INCH POLY ALONG MAY STREET IN MADISONVILLE, MADISON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY DECEMBER 5509 080.76516 473,544 INSTALL 420 FEET OF 2 INCH, 2,078 FEET OF 4 INCH POLY AND ABANDON 907 FEET OF 4 INCH, 523 FEET OF 3 INCH, 536 FEET OF 2 INCH STEEL AND 52 FEET OF 3 INCH 44 FEET OF 2 INCH POLY ALONG MAY STREET IN MADISONVILLE, MADISON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY DECEMBER 5510 080.76519 4,952 INSTALL 5,075 FEET OF 4 INCH POLY ALONG BERRY ROAD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL MESQUITE GROWTH OCTOBER 5511 080.76521 132,753 INSTALL 380 FEET OF 4 INCH POLY ALONG THE STREETS OF COPPELL AND ABANDON 250 FEET OF 4 INCH POLY AND 130 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COPPELL SYSTEM INTEGRITY JULY 5512 080.76522 521,514 INSTALL 1,642 FEET OF 4 INCH ALONG NORTH 27TH STREET FROM PARK LAKE DRIVE TO EDNA AVENUE IN WACO ABANDON 1,512 FEET OF 2 INCH STEEL AND 125 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER 5513 080.76523 24,632 INSTALL 6 FEET OF 10 INCH STEEL ALONG STREETS IN ABILENE AND ABANDON 5 FEET OF 10 INCH STEEL. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY JUNE 5514 080.76524 194,238 INSTALL 3,900 FEET OF 2 INCH AND 950 FEET OF 4 INCH POLY ALONG THE STREETS OF WYNDHAM RIDGE SUBDIVISION IN WYLIE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WYLIE GROWTH DECEMBER 5515 080.76525 43,535 INSTALL 1,640 FEET OF 4 INCH AND 1,855 FEET OF 2 INCH POLY ALONG THE STREETS OF LA FRONTERA SUBDIVSION IN FORT WORTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER 5516 080.76526 95,516 INSTALL 2,900 FEET OF 2 INCH POLY ALONG THE STREETS OF OVERLAND GROVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH OCTOBER 5517 080.76527 207,912 INSTALL 1,970 FEET OF 4 INCH, 3,500 FEET OF 2 INCH POLY ALONG BIRD STONE DRIVE IN BRIARWOOS HILLS SUBDIVISION IN FORNEY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH DECEMBER MTX Additions Page 158 of 178 377 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5518 080.76532 91,086 INSTALL 3,855 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKE SHORE VILLAGE SUBDIVISION IN ROWELETT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROWLETT GROWTH DECEMBER 5519 080.76535 23,742 INSTALL 280 FEET OF 2 INCH POLY ALONG CHANDLER AND DAY STREET AND ABANDON 283 FEET OF 3 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY JULY 5520 080.76538 510,225 INSTALL 2,520 FEET OF 2 INCH POLY ALONG NORTH 29TH STREET FROM PARK LAKE DRIVE TO EDNA AVENUE IN WACO AND ABANDON 2,019 FEET OF 2 INCH STEEL, 135 FEET OF 2 INCH POLY, 299 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. OF 1.25 INCH POLY ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 5521 080.76544 350,349 REPLACEMENT AND INCREMENTAL TOOLS. STEEL AND POLY SQUEEZE TOOLS FOR USE THROUGHOUT THE DIVISION FISCAL YEAR 2022. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT JUNE 5522 080.76550 55,957 INSTALL 120 FEET OF 2 INCH POLY ALONG FM 27 ALONG THE STREETS OF CITY OF FAIRFIELD. COMMERCIAL OR INDUSTRIAL FAIRFIELD GROWTH JUNE 5523 080.76554 56,762 INSTALL 1,080 FEET OF 8 INCH, 3,400 FEET OF 2 INCH POLY ALONG STREETS OF ROLLING RIDGE SUBDIVISION IN VAN ALSTYNE, GRAYON COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL VAN ALSTYNE GROWTH DECEMBER 5524 080.76555 172,838 INSTALL 2,340 FEET OF 8 INCH POLY ALONG HWY 5 AND REDDEN ROAD IN VAN ALSTYNE IN GRAYSON COUNTY. ALL CUSTOMERS VAN ALSTYNE GROWTH DECEMBER 5525 080.76556 470,072 INSTALL 2,435 FEET OF 2 INCH POLY ALONG NORTH 31ST STREET FROM PARK LAKE DRIVE TO EDNA AVENUE IN WACO AND ABANDON 521 FEET OF 2 INCH POLY, AND 1,924 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 5526 080.76557 246,038 INSTALL 1,500 FEET OF 2 INCH POLY ALONG MLK JR BOULEVARD, SOUTH YOUNG S ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY DECEMBER 5527 080.76560 28,632 INSTALL 3,300 FEET OF 2 INCH POLY ALONG THE STREETS OF DEVONSHIRE VILLAGE 8 SUBDIVISION IN FORNEY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH DECEMBER 5528 080.76562 88,564 INSTALL 2,800 FEET OF 6 INCH AND 4,700 FEET OF 2 INCH POLY ALONG THE STREETS OF DEVONSHIRE VILLAGE 14 SUBDIVISION IN FORNEY, KAUFMAN COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH DECEMBER 5529 080.76571 160,233 INSTALL 20 FEET OF 8 INCH STEEL AT L20-2 STATION IN GEORGETOWN AND ABANDON SKID BUILT STATION IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY DECEMBER 5530 080.76574 401,719 INSTALL 3,250 FEET OF 6 INCH, 3,000 FEET OF 4 INCH AND 1,800 FEET OF 2 INCH POLY ALONG THE STREETS OF SPRINGHILLS SUBDIVISION IN BOYD. RESIDENTIAL BOYD GROWTH DECEMBER 5531 080.76575 295,451 INSTALL 800 FEET OF 2 INCH POLY ALONG SOUTH DALLAS AVENUE AND PECAN STR ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY DECEMBER 5532 080.76577 3,294 NEW PEDESTAL FOR VEHICLE 21140 IN MCKINNEY ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT SEPTEMBER 5533 080.76580 162,004 INSTALL DISTRICT REGULATOR STATION #01 NORTH OF THE MITCHUM AND COLLEG ALL CUSTOMERS MALAKOFF SYSTEM INTEGRITY DECEMBER 5534 080.76581 46,269 INSTALL 750 FEET OF 2 INCH POLY ALONG PGA PARKWAY IN FRISCO. COMMERCIAL OR INDUSTRIAL FRISCO GROWTH SEPTEMBER 5535 080.76582 396,789 RELOCATE FACILITIES. INSTALL 2,200 FEET OF 6 INCH AND 20 FEET OF 4 INCH POLY ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5536 080.76587 962,958 INSTALL 1,850 FEET OF 12 INCH POLY ALONG JENNINGS AVE AND ABANDON 5 FEET OF 12 INCH POLY IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5537 080.76588 23,468 INSTALL 330 FEET OF 2 INCH POLY ALONG FAIR GREEN DRIVE. RESIDENTIAL TROPHY CLUB GROWTH DECEMBER 5538 080.76589 165,811 INSTALL 1,620 FEET OF 8 INCH AND 10 FEET OF 2 INCH POLY ALONG SOUTH HARDIN BOULEVARD AND MCKINNEY RANCH PARKWAY IN MCKINNEY, ALL CUSTOMERS MCKINNEY GROWTH OCTOBER 5539 080.76590 143,925 INSTALL 800 FEET OF 4 INCH, 300 FEET OF 2 INCH POLY ALONG SOUTH 31ST IN CORSICANA AND ABANDON 603 FEET OF 2 INCH, 580 FEET OF 3 INCH POLY AND 106 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY DECEMBER 5540 080.76591 324,054 RELOCATE FACILITIES. INSTALL 1,571 FEET OF 6 INCH, 15 FEET OF 4 INCH POLY ALONG TURNER WARNELL ROAD AND ABANDON 873 FEET OF 6 INCH AND 789 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5541 080.76592 17,948 INSTALL 535 FEET OF 2 INCH POLY ALONG SOUTH HARDIN BOULEVARD IN MCKINNEY. COMMERCIAL OR INDUSTRIAL MCKINNEY GROWTH OCTOBER 5542 080.76612 9,034 INSTALL 1,700 FEET OF 4 INCH POLY ALONG TX 121 IN BONHAM, FANNIN COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL BONHAM GROWTH DECEMBER 5543 080.76615 16,986 INSTALL A 4 INCH METER STATION ALONG BELTLINE IN LANCASTER. ALL CUSTOMERS LANCASTER GROWTH DECEMBER 5544 080.76621 28,822 INSTALL INTERNET EQUIPMENT, RADIOS AND BACKUP POWR AT VARIOUS LOCATIONS IN DALLAS. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT DECEMBER 5545 080.76624 4,887 INSTALL 305 FEET OF 4 INCH POLY ALONG THE STREETS OF DENTON CROSSING SUBDIVISION IN DENTON. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL DENTON GROWTH DECEMBER 5546 080.76627 5,205 INSTALL LED LIGHTS IN VERNON SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JUNE 5547 080.76628 465,578 INSTALL 2,975 FEET OF 2 INCH POLY ALONG THE STREETS OF GOLDTHWAITE AND ABANDON 315 FEET OF 2 INCH POLY AND 2,732 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GOLDTHWAITE SYSTEM INTEGRITY DECEMBER 5548 080.76629 6,866 INSTALL 1,900 FEET OF 4 INCH POLY ALONG US HWY 82 IN BONHAM, FANNIN COUNTY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS BONHAM GROWTH DECEMBER 5549 080.76633 1,503 RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH AND 5 FEET OF 2 INCH POLY AL ALL CUSTOMERS DENTON SYSTEM INTEGRITY JULY 5550 080.76635 606,708 MID-TEX EQUIPMENT CAPITAL FUNDING FOR THE PURCHASE OF 50 GAS TRAC LZ- 30. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT JUNE 5551 080.76638 92,163 INSTALL DISTRICT REGULATOR STATION #23, 75 FEET OF 2 INCH AND 75 FEET OF 4 INCH POLY ALONG WOODS AND BIRGE STREETS IN SHERMAN AND ABANDON DISTRICT REGULATOR STATION #23 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY DECEMBER 5552 080.76641 5,053 INSTALL NEW FENCE AROUND DISTRICT REGULATOR STATION #18 ALONG 10TH SOUTHEAST AND POLK STREET IN PARIS, TEXAS ALL CUSTOMERS PARIS SYSTEM INTEGRITY APRIL 5553 080.76644 1,030,193 INSTALL 3,060 FEET OF 4 INCH AND 180 FEET OF 2 INCH POLY NEAR THE INTERSECT ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5554 080.76650 282,070 RELOCATE FACILITIES. INSTALL 1,050 FEET OF 4 INCH AND 365 FEET OF 2 INCH POLY ALONG SOUTH JUDKINS STREET AND ABANDON 1,420 FEET OF 4 INCH AND 190 FEET OF 2 INCH STEEL TO ACCOMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5555 080.76653 46,262 INSTALL 400 FEET OF 2 INCH POLY ALONG MELISSA COURT. RESIDENTIAL KELLER GROWTH SEPTEMBER 5556 080.76655 141,321 RELOCATE FACILITIES. INSTALL 600 FEET OF 4 INCH POLY ALONG EAST BALTIMORE ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER 5557 080.76656 1,735 INSTALL 300 FEET OF 4 INCH POLY ALONG THE STREETS OF DFW AIRPORT IN IRVING. COMMERCIAL OR INDUSTRIAL IRVING GROWTH OCTOBER 5558 080.76657 607,453 INSTALL 2,460 FEET OF 4 INCH POLY BETWEEN SAN MEDINA AND GUS THOMASSON IN DALLAS AND ABANDON 2,460 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5559 080.76658 47,091 INSTALL 460 FEET OF 2 INCH POLY ALONG BONNIE BRAE STREET RIGHT OF WAY IN DENTON. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL DENTON GROWTH DECEMBER 5560 080.76659 621,350 INSTALL 2,075 FEET OF 12 INCH, 640 FEET OF 4 INCH AND 8,365 FEET OF 2 INCH POLY ALONG HOMETOWN BOULEVARD IN CRANDALL. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH DECEMBER 5561 080.76660 799,646 INSTALL 2,765 FEET OF 2 INCH POLY AND ABANDON 2,765 FEET OF 3 INCH STEEL ALONG SAN MEDINA AND SAN PAULA IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5562 080.76661 275,171 INSTALL 1,100 FEET OF 2 INCH AND 600 FEET OF 4 INCH POLY AND ABANDON 174 FEET OF 4 INCH, 310 FEET OF 6 INCH, 742 FEET OF 3 INCH, 350 FEET OF 2 INCH STEEL AND 190 FEET OF 6 INCH 100 FEET OF 2 INCH POLY ALONG WITH DISTRICT REGULATOR STATION 02 LOCATED ON AVE 3 AND EAST 3RD IN BURKBURNETT, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURKBURNETT SYSTEM INTEGRITY DECEMBER 5563 080.76662 137,496 INSTALL DISTRICT REGULATOR STATION #13 ALONG 4TH STREET NORTHWEST AND AVENUE C NORTHWEST IN CHILDRESS AND ABANDON DISTRICT REGULATOR STATION #13 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY DECEMBER 5564 080.76664 4,895 INSTALL 400 FEET OF 4 INCH POLY ALONG 800 MARIO COURT IN LEWISVILLE. COMMERCIAL OR INDUSTRIAL LEWISVILLE GROWTH SEPTEMBER 5565 080.76666 245,675 INSTALL 1,548 FEET OF 2 INCH POLY ALONG NORTH THOMPSON STREET, CRAIG STREET IN HILLSBORO AND ABANDON 769 FEET OF 2 INCH, 350 FEET OF 4 INCH STEEL AND 415 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY DECEMBER 5566 080.76672 112,793 INSTALL DISTRICT REGULATOR STATION #03, 65 FEET OF 4 INCH AND 30 FEET OF 6 ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER 5567 080.76673 133,946 INSTALL DISTRICT REGULATOR STATION #04 AND 185 FEET OF 4 INCH AND 30 FEET ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER MTX Additions Page 159 of 178 378 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5568 080.76680 115,120 INSTALL DISTRICT REGULATOR STATION DRS015 AND 35 FEET OF 2 INCH 50 FEET OF 6 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS015 AND 60 FEET OF 2 INCH, 105 FEET OF 6 INCH STEEL AND 5 FEET OF 6 INCH POLY ALONG GRANT STREET IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 5569 080.76681 180,115 INSTALL 110 FEET OF 2 INCH, 485 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION DRS025 AND ABANDON DISTRICT REGULATOR STATION DRS025 AND 297 FEET OF 3 INCH POLY AND 17 FEET OF 3 INCH, 12 FEET OF 4 INCH, AND 18 FEET OF 6 INCH STEEL ALONG GALVESTON STREET IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 5570 080.76682 558,349 INSTALL 2,104 FEET OF 4 INCH POLY ALONG THE STREETS OF FORT WORTH AND AB ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5571 080.76684 206,913 INSTALL DISTRICT REGULATOR STATION DRS64 AND 325 FEET OF 4 INCH, 325 FEET OF 6 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS64 AND 21 FEET OF 4 INCH AND 25 FEET OF 6 INCH STEEL ALONG HARRISON STREET IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 5572 080.76686 213,650 INSTALL DISTRICT REGULATOR STATION DRS118 AND 445 FEET OF 2 INCH, 365 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS118 AND 27 FEET OF 2 INCH POLY, 18 FEET OF 2 INCH, 9 FEET OF 3 INCH, AND 34 FEET OF 4 INCH STEEL IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 5573 080.76687 37,697 INSTALL 100 FEET OF 2 INCH POLY ALONG WEST PLUM. RESIDENTIAL DE LEON GROWTH DECEMBER 5574 080.76688 15,421 INSTALL 5,300 FEET OF 8 INCH POLY ALONG BELTLINE ROAD IN LANCASTER. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LANCASTER GROWTH DECEMBER 5575 080.76694 20,994 INSTALL UPGRADED METER AT TRINITY RIVER AUTHORITY DUE TO BOILER INSTALL IN DALLAS, DALLAS COUNTY. ALL CUSTOMERS DALLAS GROWTH NOVEMBER 5576 080.76695 193,657 INSTALL MOTORIZED REGULATORS AND ABANDON MOTORIZED REGULATORS ACROSS THE MDTX SYSTEM FOR 45 LOCATIONS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER 5577 080.76697 554,977 REPLACE DISTRIBUTION MOTORIZED REGULATORS IN 95 LOCATIONS ACROSS THE MDTX SYSTEM IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER 5578 080.76698 3,189 INSTALL 1,206 FEET OF 2 INCH POLY ALONG THE STREETS OF SUN CITY NH 80. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER 5579 080.76703 790,745 PURCHASE AND INSTALL NEW OFFICE FURNITURE, BUILDING SIGNAGE, BUILDING FIRE ALARM SYSTEM, BUILDING ACCESS CONTROLS, BUILDING SURVEILLANCE SYSTEM, IT/COMPUTER AND PHONE EQUIPMENT, AUDIO AND VISUAL APPLICANCES FOR ROUNDROCK SERVICE CENTER, WILLIAMSON COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER 5580 080.76713 413,574 RELOCATE FACILITIES. INSTALL 119 FEET OF 2 INCH, 2,481 FEET OF 4 INCH POLY AND ABANDON 1,267 FEET OF 3 INCH, 580 FEET OF 4 INCH POLY AND 133 FEET OF 2 INCH, 518 FEET OF 4 INCH STEEL IN CAMERON, MILAM COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY DECEMBER 5581 080.76714 58,525 ABANDON METER TUBE GAP CONTROLLERS AT GENERAL MOTORS ASSEMBLY PLANT AND FOSTER FORBES LOCATIONS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5582 080.76724 63,558 RELOCATE FACILITIES. INSTALL 177 FEET OF 2 INCH POLY ALONG FM 1417 TO ACCOMMODATE TXDOT WIDENING PROJECT AND ABANDON 150 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY DECEMBER 5583 080.76728 13,684 INSTALL 600 FEET OF 2 INCH ALONG DENTON COUNTY RIGHT OF WAY IN UNINCORPORATED DENTON COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL UNINCORPORATED GROWTH DECEMBER 5584 080.76731 528,905 INSTALL 2,675 FEET OF 2 INCH AND 80 FEET OF 8 INCH POLY ALONG STEPHANIE DRIVE AND ABANDON 2,675 FEET OF 3 INCH AND 80 FEET OF 8 INCH STEEL IN HALTOM CITY, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY DECEMBER 5585 080.76735 37,803 INSTALL 3,373 FEET OF 6 INCH POLY ALONG NORWICH STREET IN DALLAS. COMMERCIAL OR INDUSTRIAL DALLAS GROWTH DECEMBER 5586 080.76737 144,273 INSTALL 2,130 FEET OF 4 INCH AND 2,820 FEET OF 2 INCH POLY ALONG THE STREETS OF STONE EAGLE SUBDIVISION IN AZLE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL AZLE GROWTH DECEMBER 5587 080.76738 51,735 INSTALL 230 FEET OF 4 INCH POLY ALONG WHEELER AND ABANDON 210 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY SEPTEMBER 5588 080.76752 63,303 INSTALL 130 FEET OF 4 INCH POLY ALONG NELSON AND ROBERTS AND ABANDON 125 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE SYSTEM INTEGRITY DECEMBER 5589 080.76754 219,098 INSTALL 3,250 FEET OF 2 INCH POLY ALONG THE STREETS OF NORTH STAR SUBDIVISION IN FORT WORTH, TARRANT COUNTY. RESIDENTIAL FORT WORTH GROWTH DECEMBER 5590 080.76763 79,161 INSTALL 3,591 FEET OF 2 INCH AND 1,740 FEET OF 4 INCH POLY ALONG THE STREETS OF EMMANUAL LANE IN CELINA, COLLIN COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH DECEMBER 5591 080.76765 21,612 INSTALL 1,185 FEET OF 2 INCH POLY ALONG SOUTH LOCKHART ROAD AND WEST WASHINGTON STREET IN STEPHENVILLE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL STEPHENVILLE GROWTH SEPTEMBER 5592 080.76771 37,603 INSTALL 330 FEET OF 4 INCH POLY ALONG 4TH STREET SOUTHWEST AND ABANDON 309 FEET OF 3 INCH STEEL, 17 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY JULY 5593 080.76773 815,291 INSTALL REGULATOR STATION AND 700 FEET OF 8 INCH POLY AND RETIRE OLD STATION ALONG NEW YORK AVE IN ARLINGTON, TARRANT COUNTY ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5594 080.76776 (5,609) RELOCATE FACILITIES. INSTALL 122 FEET OF 6 INCH POLY ALONG MORNINGSTAR BOULEVARD AND STELLAR WIND DIRVE AND ABANDON 55 FEET OF 6 INCH POLY ALL CUSTOMERS GEORGETOWN RELOCATION OF FACILITIES SEPTEMBER 5595 080.76778 100,630 RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH POLY ALONG TURTLE COVE STREET IN ROCKWALL AND ABANDON 190 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY OCTOBER 5596 080.76780 50,505 INSTALL 10 FEET OF 4 INCH STEEL AND METER SET AND DISTRICT REGULATOR STATION ALONG MARS DRIVE IN WOODWAY. COMMERCIAL OR INDUSTRIAL WOODWAY GROWTH DECEMBER 5597 080.76782 120,868 RELOCATE FACILITIES. INSTALL 950 FEET OF 4 INCH POLY TO ACCOMODATE CITY O ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER 5598 080.76783 9,599 INSTALL 700 FEET OF 4 INCH POLY ALONG MAIN STREET AND ABANDON 350 FEET OF 2 INCH AND 350 FEET OF 1.25 INCH POLY IN LEWISVILLE. ALL CUSTOMERS LEWISVILLE SYSTEM IMPROVEMENT DECEMBER 5599 080.76788 24,697 INSTALL 687 FEET OF POLY ALONG THE STREETS OF BURLESON. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL BURLESON GROWTH SEPTEMBER 5600 080.76793 44,596 INSTALL 50 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 45 FEET OF 2 INCH STEEL AND 5 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS YANTIS SYSTEM INTEGRITY DECEMBER 5601 080.76794 42,881 RELOCATE FACILITIES. INSTALL 330 FEET OF 6 INCH POLY ALONG LIVE OAK STREET IN COMMERCE AND ABANDON 330 FEET OF 6 INCH STEEL. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS COMMERCE RELOCATION OF FACILITIES DECEMBER 5602 080.76799 688,985 INSTALL 965 FEET OF 2 INCH, 1,137 FEET OF 4 INCH AND ABANDON 424 FEET OF 3 IN ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY DECEMBER 5603 080.76806 27,028 INSTALL 200 FEET OF 2 INCH POLY ALONG THE STREETS OF INDUSTRIAL PARK ALONG FM 1641. COMMERCIAL OR INDUSTRIAL TALTY GROWTH JUNE 5604 080.76808 (43,223) RELOCATE FACILITIES. INSTALL 1,285 FEET OF 4 INCH AND 176 FEET OF 2 INCH POLY ALONG BULLDOG STADIUM DRIVE AND THIRD STREET IN BURNET AND ABANDON 850 FEET OF 4 INCH POLY. ALL CUSTOMERS BURNET RELOCATION OF FACILITIES DECEMBER 5605 080.76809 98,655 INSTALL 1,100 FEET OF 2 INCH POLY ALONG HARDIWICK PLACE IN ABILENE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ABILENE GROWTH OCTOBER 5606 080.76813 197,994 INSTALL 5,000 FEET OF 2 INCH POLY ALONG THE STREETS OF WOODCREEK SUBDIVISION IN FATE. RESIDENTIAL FATE GROWTH SEPTEMBER 5607 080.76814 564,806 RELOCATE FACILITIES. INSTALL 850 FEET OF 2 INCH AND 1,400 FEET OF 6 INCH POLY ALONG MERRITT STREET IN RIVER OAKS AND ABANDON 1,400 FEET OF 2 INCH AND 575 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY DECEMBER 5608 080.76815 21,984 INSTALL 1,000 FEET OF 4 INCH POLY ALONG HARDWIC STREET IN ABILENE. ALL CUSTOMERS ABILENE GROWTH DECEMBER MTX Additions Page 160 of 178 379 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5609 080.76819 134,837 INSTALL 890 FEET OF 2 INCH POLY ALONG RITA AND CLIFF IN GARLAND AND ABANDON 880 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5610 080.76823 66,272 INSTALL 150 FEET OF 6 INCH POLY AND 50 FEET OF 2 INCH POLY ALONG MILAM & PRESTON STREETS AND ABANDON 150 FEET OF 6 INCH AND 50 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER 5611 080.76825 11,165 INSTALL 850 FEET OF 2 INCH POLY ALONG STREETS OF GRAND PRAIRIE. COMMERCIAL OR INDUSTRIAL GRAND PRAIRIE GROWTH SEPTEMBER 5612 080.76826 49,841 REPLACE OUTLET LEG OF DISTRICT REGULATOR STATION DFW#06. INSTALL 7 FEET OF 4 INCH STEEL AND ABANDON 7 FEET OF 2 INCH STEEL AT DFW AIRPORT IN GRAPEVINE. ALL CUSTOMERS GRAPEVINE SYSTEM IMPROVEMENT DECEMBER 5613 080.76827 21,317 INSTALL 80 FEET OF 4 INCH POLY ALONG NORTH COLLLINS IN ARLINGTON, TARRANT COUNTY. COMMERCIAL OR INDUSTRIAL ARLINGTON GROWTH DECEMBER 5614 080.76830 11,580 INSTALL 750 FEET OF 2 INCH POLY ALONG WALNUT LANE IN FORNEY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORNEY GROWTH DECEMBER 5615 080.76831 456,746 INSTALL 160 FEET OF 12 INCH, 25 FEET OF 2 INCH AND 20 FEET OF 6 INCH POLY ALONG HIGHWAY 277 AND ABANDON 150 FEET OF 10 INCH AND 15 FEET OF 6 INCH STEEL AND 20 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 5616 080.76832 1,185,083 INSTALL ATLAS COMPOSITE WRAP TO RESTORE THE INTEGRITY OF LINE D-D9 IN IRVING IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER 5617 080.76833 (137) ABANDON 273 FEET OF 12 INCH STEEL ALONG STREETS OF MELISSA. ALL CUSTOMERS MELISSA SYSTEM INTEGRITY AUGUST 5618 080.76835 580,374 INSTALL 2,550 FEET OF 4 INCH POLY ALONG THE STREETS OF DALLAS AND ABANDON 2,350 FEET OF 4 INCH STEEL, 200 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5619 080.76841 234,921 INSTALL 50 FEET OF 2 INCH AND 1,515 FEET OF 4 INCH POLY ALONG NORTH WASHINGTON STREET AND MAPLE STREET IN FARMERSVILLE, COLLIN COUNTY AND ABANDON 1,350 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY DECEMBER 5620 080.76842 259,043 INSTALL 125 FEET OF 2 INCH AND 1,365 FEET OF 4 INCH POLY ALONG NORTH WASHINGTON STREET AT HALE STREET IN FARMERSVILLE AND ABANDON 326 FEET OF 3 INCH POLY AND 1,094 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY DECEMBER 5621 080.76845 8,790 INSTALL 3,160 FEET OF 2 INCH POLY ALONG THE STREETS OF HOMESTEAD SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH JULY 5622 080.76846 (43,526) INSTALL 755 FEET OF 6 INCH POLY ALONG HIGHWAY 281 IN MARBLE FALLS AND ABANDON 854 FEET OF 6 INCH POLY. ALL CUSTOMERS MARBLE FALLS RELOCATION OF FACILITIES OCTOBER 5623 080.76847 82,883 INSTALL 860 FEET OF 6 INCH POLY ALONG HEMPHILL STREET. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER 5624 080.76848 49,299 INSTALL 5 FEET OF 8 INCH POLY ALONG GREAT OAKS DRIVE IN BRUSHY CREEK AND ABANDON 8 FEET OF 8 INCH POLY. ALL CUSTOMERS BRUSHY CREEK SYSTEM INTEGRITY DECEMBER 5625 080.76857 78,401 INSTALL 900 FEET OF 4 INCH AND 2,840 FEET OF 2 INCH POLY ALONG THE STREET OF ESPERANZA SUBDIVISION IN MESQUITE. DEVELPOER INSTALLED FACILITIES. RESIDENTIAL MESQUITE GROWTH DECEMBER 5626 080.76858 140,194 RELOCATE FACILITIES. INSTALL 355 FEET OF 6 INCH ALONG GREENVILLE AVENUE IN ALLEN AND ABANDON 346 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF ALLEN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN SYSTEM INTEGRITY DECEMBER 5627 080.76861 26,988 INSTALL 1,535 FEET OF 4 INCH AND 1,158 FEET OF 2 INCH POLY ALONG THE STREETS OF SALERNO SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER 5628 080.76862 138,847 INSTALL 200 FEET OF 12 INCH STEEL AND ABANDON 200 FEET OF 12 INCH STEEL ALONG FM 1417 IN SHERMAN, GRAYSON COUNTY. ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES DECEMBER 5629 080.76864 792,872 INSTALL 4,095 FEET OF 4 INCH POLY ALONG BURLINGTON ROAD BETWEEN MINTON ROAD AND EAST MCLEROY BOULEVARD IN SAGINAW AND ABANDON 3,920 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY DECEMBER 5630 080.76867 128,736 INSTALL GROUNDBED ON L14-1(2ND) IN TEMPLE AND ABANDON GROUNDBED ON L14-1(2ND) IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY OCTOBER 5631 080.76873 132,184 INSTALL 1,075 FEET OF 4 INCH POLY ALONG COLD SPRINGS ROAD TO ACCOMODATE CITY OF FORT WORTH STREETS PROJECT AND ABANDON 827 FEET OF 4 INCH STEEL AND 300 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 5632 080.76888 193,525 INSTALL 793 FEET OF 6 INCH, 61 FEET OF 4 INCH AND 145 FEET OF 2 INCH POLY ALO ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5633 080.76889 313,925 INSTALL 1,548 FEET OF 4 INCH POLY ALONG LOVERS LANE IN ARLINGTON, TARRANT COUNTY AND ABANDON 1,550 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5634 080.76890 284,515 INSTALL 1,413 FEET OF 4 INCH POLY ALONG LOVERS LANE AND DANIEL DRIVE IN ARLINGTON AND ABANDON 1,335 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5635 080.76891 296,354 INSTALL 1,357 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY ALONG LOVERS LANE IN ARLINGTON AND ABANDON 1,350 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5636 080.76892 276,344 INSTALL 1,056 FEET OF 4 INCH AND 309 FEET OF 2 INCH POLY ALONG LOVERS LANE IN ARLINGTON, TARRANT COUNTY AND ABANDON 1,050 FEET OF 4 INCH, 145 FEET OF 1.25 INCH STEEL AND 15 FEET OF 4 INCH, 20 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5637 080.76893 264,720 INSTALL 1,038 FEET OF 4 INCH AND 255 FEET OF 2 INCH POLY ALONG GLYNN OAKS DRIVE IN ARLINGTON AND ABANDON 1,025 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5638 080.76894 310,407 INSTALL 1,360 FEET OF 4 INCH AND 11 FEET OF 2 INCH POLY ALONG GLYNN OAKS DRIVE IN ARLINGTON, TARRANT COUNTY AND ABANDON 1.365 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5639 080.76895 171,231 INSTALL 1,502 FEET OF 2 INCH POLY AND ABANDON 625 FEET OF 4 INCH AND 220 FEET OF 2 INCH STEEL ALONG RAYBORN DRIVE IN ARLINGTON, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5640 080.76897 269,825 INSTALL 1,551 FEET OF 2 INCH POLY AND ABANDON IN 1,540 FEET OF 4 INCH STEEL ALONG TUCKER BOULEVARD IN ARLINGTON, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5641 080.76898 311,020 INSTALL 1,533 FEET OF 4 INCH POLY AND ABANDON 1,510 FEET OF 4 INCH STEEL ALONG GLYNN OAKS DRIVE IN ARLINGTON, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5642 080.76899 150,001 INSTALL 995 FEET OF 4 INCH 335 FEET OF 2 INCH POLY AND ABANDON 940 FEET OF 4 INCH STEEL ALONG BROWNING DRIVE IN ARLINGTON, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 5643 080.76908 922,238 INSTALL 209 SUSL ALONG STREETS OF BURNETT AND ABANDON 209 SUSL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURNET SYSTEM INTEGRITY OCTOBER 5644 080.76912 512,806 RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH AND 1,275 FEET OF 6 INCH POL ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY DECEMBER 5645 080.76913 799,616 INSTALL 805 FEET OF 4 INCH, 3,070 FEET OF 2 INCH POLY ALONG HARLINGEN STRE ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5646 080.76915 736,908 RELOCATE FACILITIES. INSTALL 4,050 FEET OF 4 INCH POLY ALONG LONG AVENUE TO ACCOMMODATE CITY OF RIVER OAKS STREET PROJECT AND ABANDON 55 FEET OF 2 INCH, 355 FEET OF 3 INCH, AND 3,175 OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY DECEMBER 5647 080.76921 16,011 INSTALL 100 FEET OF 2 INCH POLY ALONG PINKSTON STREET IN THE CITY OF TERRELL. RESIDENTIAL TERRELL GROWTH SEPTEMBER 5648 080.76922 36,827 INSTALL 75 FEET OF 2 INCH POLY ALONG THE STREETS OF ABILENE. RESIDENTIAL ABILENE GROWTH OCTOBER 5649 080.76924 39,009 INSTALL 1,550 FEET OF 6 INCH POLY ALONG BERKSHIRE LAKE BOULEVARD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH OCTOBER MTX Additions Page 161 of 178 380 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5650 080.76925 150,886 INSTALL 550 FEET OF 4 INCH POLY ALONG BUTTERNUT STREET AND ABANDON 357 FEET OF 4 INCH STEEL AND 156 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 5651 080.76929 156,645 INSTALL 600 FEET OF 2 INCH POLY ALONG HATCH ROAD TO ACCOMODATE TARRANT COUNTY STREET PROJECT AND ABANDON 603 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5652 080.76930 11,562 INSTALL 1,084 FEET OF 4 INCH AND 3,560 FEET OF 2 INCH POLY ALONG THE STREETS OF ROENBUSCH RANCH SUBDIVISION IN LEANDER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER 5653 080.76931 7,604 INSTALL 982 FEET OF 2 INCH POLY ALONG THE STREETS OF PIONEER CROSSING SUBDIVISION IN AUSTIN. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL AUSTIN GROWTH DECEMBER 5654 080.76932 73,231 INSTALL 900 FEET OF 6 INCH POLY ALONG NORTH STATE HIGHWAY 360 IN MANSFIELD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MANSFIELD GROWTH OCTOBER 5655 080.76936 67,495 PURCHASE 24 VIVAX 560 LOCATOR KIT INCLUDING RECEIVER TRANSMITTER LEADS FOR DIVISION WIDE EQUIPMENT PROJECT IN DALLAS. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT SEPTEMBER 5656 080.76937 102,971 RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY ALONG CHAFFIN DRIVE IN RICHLAND HILLS AND ABANDON 385 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS SYSTEM INTEGRITY DECEMBER 5657 080.76946 6,326 INSTALL 450 FEET OF 4 INCH POLY ALONG NORTHGATE DRIVE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL SHERMAN GROWTH SEPTEMBER 5658 080.76950 1,746 PURCHASE 1 NEW GAUGE ULTRASONIC THICKNESS TI-45N. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT JUNE 5659 080.76951 552,455 INSTALL 1,000 FEET OF 4 INCH POLY ALONG SHILOH ALLEY IN DALLAS AND ABANDON 1,000 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5660 080.76957 265,958 INSTALL 1670 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY ALONG ROCKHILL ROAD IN FRISCO, DENTON COUNTY. ALL CUSTOMERS FRISCO GROWTH DECEMBER 5661 080.76964 108,376 INSTALL 100 FEET OF 2 INCH POLY ALONG GLENVILLE DRIVE AND INTERNATIONAL PARKWAY AND ABANDON 100 FEET OF 2 INCH POLY IN RICHARDSON, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY DECEMBER 5662 080.76965 222,885 RELOCATE FACILITIES. INSTALL 700 FEET OF 4 INCH POLY ALONG WEATHERRED DRIVE IN RICHARDSON AND ABANDON 700 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY DECEMBER 5663 080.76967 227,217 INSTALL 1,290 FEET OF 4 INCH AND 3,095 FEET OF 2 INCH POLY ALONG THE STREETS OF FERRIS SPRING SUBDIVISION IN FERRIS, ELLIS COUNTY. DEVELOPER INSTALLED FACLITIES. RESIDENTIAL FERRIS GROWTH DECEMBER 5664 080.76968 16,556 INSTALL 285 FEET OF 2 INCH POLY ALONG THE STREETS OF MELISSA. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL MELISSA GROWTH DECEMBER 5665 080.76971 366,462 RELOCATE FACILITIES. INSTALL 1,215 FEET OF 4 INCH, AND 480 FEET OF 2 INCH POLY TO ACCOMODATE CITY OF GRAPEVINE STREET PROJECT AND ABANDON 638 FEET OF 3 INCH, 2,748 FEET OF 4 INCH POLY IN GRAPEVINE, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER 5666 080.76974 7,792 INSTALL 300 FEET OF 4 INCH POLY NEAR THE INTERSECTION OF CEDAR VALLEY AND MIDPOINT IN LANCASTER. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL LANCASTER GROWTH DECEMBER 5667 080.76975 351,964 RELOCATE FACILITIES. INSTALL 715 FEET OF 4 INCH AND 1,260 FEET OF 2 INCH POL ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER 5668 080.76978 178 RELOCATE FACILITIES INSTALL 950 FEET OF 4 INCH POLY ALONG THE STREETS OF ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY SEPTEMBER 5669 080.76983 524,254 INSTALL 1,600 FEET OF 6 INCH POLY AND ABANDON 1,600 FEET OF 6 INCH BARE STEEL ALONG VAUGHN BOULEVARD IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5670 080.76988 38,346 INSTALL 50 FEET OF 2 INCH POLY AND ABANDON 100 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION #21 IN STAMFORD ALONG EAST VANDERBILT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY SEPTEMBER 5671 080.76989 145,419 INSTALL 40 FEET OF 2 INCH POLY ALONG TOMIE STREET AND ABANDON 20 FEET OF 2 IN POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUITMAN SYSTEM INTEGRITY SEPTEMBER 5672 080.76990 31,073 INSTALL 100 FEET OF 2 INCH POLY ALONG ISOM LANE IN DALLAS. RESIDENTIAL DESOTO GROWTH DECEMBER 5673 080.76992 66,737 INSTALL 200 FEET OF 6 INCH POLY ALONG HILLCREST ROAD AND OHIO DRIVE IN FRISCO AND ABANDON 139 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO SYSTEM INTEGRITY DECEMBER 5674 080.76993 182,351 INSTALL 755 FEET OF 2 INCH POLY ALONG THE STREETS OF STEPHENVILLE AND AB ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY DECEMBER 5675 080.76998 1,451,928 INSTALL 1,335 FEET OF 2 INCH AND 3,270 FEET OF 4 INCH POLY ALONG FERGUSON ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5676 080.77000 91,824 INSTALL 850 FEET OF 2 INCH POLY ALONG OLD NOVICE ROAD IN PARIS AND ABANDON 850 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER 5677 080.77006 315,183 PURCHASE 39 SENSIT TRAK-IT IIIA AND 115 SENSIT GOLD G2S CGIS THROUGHOUT THE DIVISION. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT DECEMBER 5678 080.77007 127,201 INSTALL 3,500 FEET OF 2 INCH POLY ALONG THE STREETS OF HARVEST SUBDIVISION IN NORTHLAKE. RESIDENTIAL NORTHLAKE GROWTH DECEMBER 5679 080.77009 60,234 INSTALL 1,400 FEET OF 2 INCH POLY ALONG THE STREETS OF HARVEST SUBDIVISION IN NORTHLAKE. RESIDENTIAL NORTHLAKE GROWTH DECEMBER 5680 080.77011 26,147 INSTALL 110 FEET OF 4 INCH POLY ALONG EAST 23RD STREET IN BRYAN. RESIDENTIAL BRYAN GROWTH DECEMBER 5681 080.77012 327,241 INSTALL DISTRICT REGULATOR STATION #09 AND 110 OF 2 INCH, 10 FEET OF 4 INCH ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 5682 080.77016 224,396 INSTALL 4,900 FEET OF 2 INCH AND 550 FEET OF 4 INCH POLY ALONG THE STREETS OF BEAR CREEK SUBDIVISION IN LAVON. RESIDENTIAL LAVON GROWTH SEPTEMBER 5683 080.77019 31,936 INSTALL 3,940 FEET OF 2 INCH POLY ALONG THE STREETS OF WESTLAKE SUBDIVISION IN MCGREGOR. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WOODWAY GROWTH DECEMBER 5684 080.77025 10,926 INSTALL 75 FEET OF 2 INCH POLY ALONG REDWOOD CREEK DRIVE IN FAIRVIEW. RESIDENTIAL FAIRVIEW GROWTH OCTOBER 5685 080.77026 1,397 INSTALL 5 FEET OF 2 INCH POLY ALONG WAYSIDE IN PILOT POINT AND ABANDON 5 FEET OF 2 INCH POLY. ALL CUSTOMERS PILOT POINT RELOCATION OF FACILITIES JUNE 5686 080.77031 148,783 INSTALL 950 FEET OF 2 INCH POLY ALONG LEONA AVENUE IN DALLAS AND ABANDON 950 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5687 080.77036 229,674 INSTALL 6,400 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKE BREEZE ESTATES SUBDIVISION IN LAVON. RESIDENTIAL LAVON GROWTH OCTOBER 5688 080.77039 590,465 INSTALL 3,160 FEET OF 6 INCH POLY ALONG RAY DRIVE AND JUANITA DRIVE IN DENISON AND ABANDON 3,320 FEET OF 2 INCH STEEL AND 99 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY DECEMBER 5689 080.77041 3,626 INSTALL 5 FEET OF 2 INCH POLY ALONG HOLIDAY STREET IN PILOT POINT AND ABANDON 5 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PILOT POINT SYSTEM INTEGRITY JULY 5690 080.77042 248,101 INSTALL 1,290 FEET OF 6 INCH POLY ALONG MARY LAKE DRIVE IN BRYAN AND ABANDON 1,290 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY DECEMBER 5691 080.77043 145,749 INSTALL DISTRICT REGULATOR STATION DRS01, 90 FEET OF 3 INCH AND 60 FEET OF 4 INCH POLY AND ABANDON REGULATOR STATION, 60 FEET OF 3 INCH, 20 FEET OF 2 INCH POLY AND 20 FEET OF 2 INCH, AND 20 FEET OF 4 INCH STEEL IN OGLESBY, CORYELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OGLESBY SYSTEM INTEGRITY DECEMBER 5692 080.77045 10,162 INSTALL 3,080 FEET OF 6 INCH POLY ALONG HARMONSON ROAD IN NORTHLAKE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL NORTHLAKE GROWTH SEPTEMBER 5693 080.77046 194,555 INSTALL 1,050 FEET OF 2 INCH, 80 FEET OF 4 INCH POLY ALONG AVENUE A AND AVENUE E IN ENNIS AND ABANDON 400 FEET OF 2 INCH STEEL AND 650 FEET OF 2 INCH, 80 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER 5694 080.77048 206,753 RELOCATE FACILITIES. INSTALL 860 FEET OF 4 INCH POLY ALONG SADDLE TRAIL TO ACCOMMODATE TARRANT COUNTY STREET PROJECT AND ABANDON 842 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 162 of 178 381 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5695 080.77049 326,040 INSTALL 910 FEET OF 2 INCH, 550 FEET OF 4 INCH POLY ALONG PIMLICO WAY AND ABANDON 1,158 FEET OF 2 INCH, 200 FEET OF 3 INCH STEEL IN SAGINAW, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY DECEMBER 5696 080.77051 256,933 INSTALL 350 FEET OF 6 INCH AND 6,750 FEET OF 12 INCH STEEL ALONG HK DODGEN LOOP IN TEMPLE AND ABANDON 6,700 FEET OF 6 INCH STEEL ALL CUSTOMERS TEMPLE SYSTEM IMPROVEMENT OCTOBER 5697 080.77054 164,288 INSTALL DISTRICT REGULATOR STATION #01, 50 FEET OF 2 INCH AND 25 FEET OF 4 ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY DECEMBER 5698 080.77055 17,725 RELOCATE FACILITIES. INSTALL 65 FEET OF 2 INCH POLY ALONG SOUTH WILSON STREET AND ABANDON 280 FEET OF 4 INCH POLY TO ACCOMODATE THE CITY OF BURLESON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY OCTOBER 5699 080.77057 25,203 MODIFY DISTRICT REGULATOR STATION DRS04 WITH A NEW RELIEF VALVE STACK. ABANDON WORKER MONITOR SETUP AND INSTALL 2 INCH 289P RELIEF VALVE WITH RELIEF VALVE SPOOL. ABANDON 2 INCH FISHER 243 MONITOR REGULATOR IN BELMEADE, MCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELLMEAD SYSTEM INTEGRITY DECEMBER 5700 080.77058 174,585 INSTALL GARLAND DISTRICT REGULATOR STATION DRS11, 40 FEET OF 2 INCH, 30 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS11, 40 FEET OF 2 INCH POLY, AND 25 FEET OF 4 INCH STEEL IN GARLAND, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5701 080.77062 136,960 INSTALL DISTRICT REGULATOR STATION DRS01 AND ABANDON DISTRICT REGULATOR STATION DRS01 IN WHITNEY, HILL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITNEY SYSTEM INTEGRITY DECEMBER 5702 080.77064 141,453 INSTALL DISTRICT REGULATOR STATION #05, 25 FEET OF 2 INCH AND 20 FEET OF 4 ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY DECEMBER 5703 080.77068 8,295 INSTALL 3,458 FEET OF 2 INCH POLY ALONG THE STREETS OF HORIZON LAKE SUBDIVISION IN LEANDER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER 5704 080.77069 106,872 INSTALL 310 FEET OF 6 INCH POLY ALONG WEST TRAVIS STREET AND 120 FEET OF 2 INCH POLY ALONG NORTH MILAM STREET IN KERRVILLE AND ABANDON 290 FEET OF 6 INCH STEEL AND 120 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG SYSTEM INTEGRITY SEPTEMBER 5705 080.77070 86,240 INSTALL 290 FEET OF 2 INCH POLY ALONG WOODPARK LANE IN BEDFORD, TARRANT COUNTY. RESIDENTIAL BEDFORD GROWTH DECEMBER 5706 080.77073 148,429 INSTALL DISTRICT REGULATOR STATION #17, 25 FEET OF 2 INCH AND 30 FEET OF 4 ALL CUSTOMERS SEAGOVILLE SYSTEM INTEGRITY DECEMBER 5707 080.77074 278,590 INSTALL 1,220 FEET OF 4 INCH AND 3,440 FEET OF 2 INCH POLY ALONG SHEPPARDS LANE AND THUNDER DRIVE IN WAXAHACHIE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WAXAHACHIE GROWTH DECEMBER 5708 080.77078 312,637 RELOCATE FACILITIES. INSTALL 2,625 FEET OF 2 INCH POLY ALONG WILLIAM SPRINGS ROAD IN LAKE WORTH TO ACCOMMODATE TARRANT COUNTY STREET PROJECT AND ABANDON 2,908 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH SYSTEM INTEGRITY OCTOBER 5709 080.77080 72,933 INSTALL 440 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 440 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLANKET SYSTEM INTEGRITY SEPTEMBER 5710 080.77081 7,998 INSTALL 997 FEET OF 4 INCH AND 5,158 FEET OF 2 INCH POLY ALONG THE STREETS OF BRIDGEHAVEN SUBDIVISION IN GEORGETOWN. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER 5711 080.77086 60,431 INSTALL 420 FEET OF 2 INCH POLY ALONG LAMAR STREET IN MERKEL AND ABANDON 520 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MERKEL SYSTEM INTEGRITY SEPTEMBER 5712 080.77087 28,745 INSTALL 50 FEET OF POLY ALONG 30TH STREET IN SNYDER AND ABANDON 1.25 INCH SERVICE LINE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY JULY 5713 080.77091 219,576 INSTALL 720 FEET OF 4 INCH AND 230 FEET OF 2 INCH POLY ALONG EAST GRAND IN COMANCHE AND ABANDON 229 FEET OF 2 INCH AND 510 FEET OF 4 INCH POLY AND 524 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY DECEMBER 5714 080.77092 107,046 INSTALL 940 FEET OF 2 INCH POLY ALONG THE STREETS OF HAMPTON HILLS SUBDIVISION IN ABILENE. RESIDENTIAL ABILENE GROWTH DECEMBER 5715 080.77093 22,222 INSTALL 100 FEET OF 2 INCH POLY ALONG LANSHIRE AND THUNDERBIRD LANE IN DALLAS. RESIDENTIAL DALLAS GROWTH DECEMBER 5716 080.77094 35,929 INSTALL 100 FEET OF 2 INCH POLY ALONG STARKS AVENUE AND HAWN FREEWAY SERVICE ROAD IN DALLAS. RESIDENTIAL DALLAS GROWTH DECEMBER 5717 080.77103 44,697 INSTALL 1,090 FEET OF 2 INCH POLY ALONG HOPKINS ROAD IN KRUM, DENTON COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL KRUM GROWTH DECEMBER 5718 080.77109 633,936 INSTALL 1,680 FEET OF 6 INCH AND 500 FEET OF 2 INCH POLY AND ABANDON 1,700 FEET OF 6 INCH, 500 FEET OF 4 INCH, 1,697 FEET OF 2 INCH STEEL AND 258 FEET OF 2 INCH POLY ALONG THE STREETS OF COLLIER AND BOND AND RAY AND JUANITA IN DENISON, GRAYSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY DECEMBER 5719 080.77110 111,689 INSTALL 35 FEET OF 2 INCH, 20 FEET OF 6 INCH, 35 FEET OF 4 INCH POLY AND DISTR ALL CUSTOMERS CISCO SYSTEM INTEGRITY SEPTEMBER 5720 080.77111 652,076 INSTALL 1,960 FEET OF 8 INCH POLY ALONG LEMMON AVENUE AND SHORECREST IN DALLAS AND ABANDON 2,060 FEET OF 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5721 080.77113 227,337 INSTALL 1,300 FEET OF 2 INCH POLY ALONG FORD STREET ALLEY FROM EAST AVENUE D TO CARVER STREET IN GARLAND AND ABANDON 630 FEET OF 4 INCH STEEL AND 370 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5722 080.77114 230,004 INSTALL 1,650 FEET OF 2 INCH POLY ALONG CLARK STREET ALLEY FROM CARVER DRIVE AND E. AVENUE D IN GARLAND AND ABANDON 1,080 FEET OF 4 INCH STEEL AND 340 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5723 080.77119 54,605 INSTALL GROUNDBED AT U-88 IN SWEETWATER AND ABANDON GROUNDBED AT U- 88. ALL CUSTOMERS HASKELL SYSTEM INTEGRITY DECEMBER 5724 080.77120 64,033 INSTALL GROUNDBED AT KC17-4 IN SWEETWATER. ALL CUSTOMERS HASKELL PIPELINE INTEGRITY DECEMBER 5725 080.77132 17,861 INSTALL 330 FEET OF 2 INCH POLY ALONG NORTH BEACH STREET. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER 5726 080.77140 67,761 INSTALL 1,200 FEET OF 4 INCH AND 550 FEET OF 2 INCH POLY ALONG THE STREETS OF GRAND PRAIRIE. ALL CUSTOMERS GRAND PRAIRIE GROWTH OCTOBER 5727 080.77153 365,351 INSTALL 4,050 FEET OF 4 INCH AND 3,750 FEET OF 2 INCH POLY ALONG THE STREETS OF TRAILSTONE SUBDIVISION IN CADDO MILLS, HUNT COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CADDO MILLS GROWTH DECEMBER 5728 080.77156 25,572 RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH POLY ALONG HACKAMORE STREET IN WHITE SETTLEMENT AND ABANDON 15 FEET OF 2 INCH STEEL AND 115 FEET OF 2 INCH POLY. ALL CUSTOMERS WHITE SETTLEMENT RELOCATION OF FACILITIES SEPTEMBER 5729 080.77160 1,108,242 INSTALL 2,098 FEET OF 4 INCH, 6,793 FEET OF 8 INCH POLY ALONG COUNTY ROAD 994 AND STATE HIGHWAY 289 IN CELINA, COLLIN COUNTY. ALL CUSTOMERS CELINA GROWTH DECEMBER 5730 080.77166 10,038 INSTALL 550 FEET OF 2 INCH POLY ALONG ROOSEVELT STREET IN SAN ANGELO. RESIDENTIAL SAN ANGELO GROWTH DECEMBER 5731 080.77167 984,570 INSTALL 1,700 FEET OF 8 INCH POLY AND ABANDON 1,255 FEET OF 8 INCH STEEL ALONG THE STREETS OF DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5732 080.77197 35,872 INSTALL 465 FEET OF 2 INCH POLY ALONG TOM CHANDLER DRIVE IN COLLEGE STATION. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH OCTOBER 5733 080.77198 227,194 INSTALL DISTRICT REGULATOR STATION #01, 25 FEET OF 4 INCH POLY ALONG WEST MARKET STREET AND 2ND STREET IN MABANK AND ABANDON DISTRICT REGULATOR STATION #01, 27 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MABANK SYSTEM INTEGRITY DECEMBER 5734 080.77203 47,391 INSTALL 500 FEET OF 2 INCH POLY ALONG LBJ FREEWAY IN DALLAS. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL DALLAS GROWTH OCTOBER 5735 080.77208 152,326 RELOCATE FACILITIES. INSTALL 304 FEET OF 2 INCH POLY ALONG MAGNOLIA PARK DRIVE IN RICHLAND HILLS AND ABANDON 292 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS SYSTEM INTEGRITY DECEMBER 5736 080.77215 11,199 INSTALL 1,215 FEET OF 2 INCH POLY ALONG THE STREETS OF WILLIAMS CREEK SUBDIVISION IN COLLEGE STATION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER MTX Additions Page 163 of 178 382 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5737 080.77217 319,654 INSTALL 900 FEET OF 6 INCH, 20 FEET OF 4 INCH POLY ALONG TRAIL LAKE DRIVE IN FORT WORTH AND ABANDON 900 FEET OF 6 INCH AND 650 FEET OF 2 INCH STEEL AND 20 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5738 080.77218 354,136 INSTALL 1,600 FEET OF 4 INCH POLY ALONG WEST SPURGEON FROM TRAIL LAKE DRIVE TO BILGADE AVENUE IN FORT WORTH AND ABANDON 1,600 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5739 080.77219 234,946 INSTALL 1,365 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY ALONG WEST SPURGEON ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5740 080.77220 172,222 INSTALL 1,050 FEET OF 2 INCH POLY ALONG SOUTH RIDGE TERRACE IN FORT WORTH AND ABANDON 650 FEET OF 2 INCH POLY AND 400 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5741 080.77224 233,770 RELOCATE FACILITIES. INSTALL 1,600 FEET OF 2 INCH POLY ALONG LONG STREET ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY DECEMBER 5742 080.77227 206,228 INSTALL 5,960 FEET OF 2 INCH POLY ALONG THE STREETS OF TRAVIS RANCH MARINA SUBDIVISION IN FORNEY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH DECEMBER 5743 080.77240 76,021 INSTALL 515 FEET OF 4 INCH POLY ALONG AT&T EXPRESSWAY IN ARLINGTON. COMMERCIAL OR INDUSTRIAL ARLINGTON GROWTH SEPTEMBER 5744 080.77250 33,376 INSTALL 886 FEET OF 2 INCH POLY ALONG THE STREETS OF RANCH PHASE SUBDIVISION IN COLLEGE STATION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER 5745 080.77256 21,870 INSTALL 155 FEET OF 2 INCH POLY ALONG EAST BRADFORD STREET IN HEARNE. RESIDENTIAL HEARNE GROWTH SEPTEMBER 5746 080.77258 1,592 PURCHASE ONE (1) PRESSURE MODULE 100 PSI, .025 ACCY ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT JUNE 5747 080.77259 8,039 INSTALL 300 FEET OF 2 INCH POLY ALONG TEXOMA PARKWAY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL DENISON GROWTH DECEMBER 5748 080.77263 293,665 INSTALL 1,560 FEET OF 2 INCH POLY ALONG CORNISH AVENUE IN FORT WORTH AND ABANDON 1,560 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5749 080.77264 358,931 INSTALL 1,585 FEET OF 4 INCH POLY ALONG STAPLES AVENUE FROM SW LOOP 820 TO BILGLADE ROAD IN FORT WORTH AND ABANDON 1,585 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5750 080.77265 142,123 INSTALL 800 FEET OF 2 INCH POLY ALONG WILLOMET AVENUE IN FORT WORTH AND ABANDON 700 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5751 080.77267 392,456 INSTALL 2,200 FEET OF 6 INCH AND 300 FEET OF 4 INCH POLY ALONG THE STREETS OF FORT WORTH, TARRANT COUNTY AND ABANDON 900 FEET OF 4 INCH AND 1,600 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5752 080.77268 51,546 INSTALL 410 FEET OF 2 INCH ALONG COVINGTON DRIVE IN WOODWAY. ALL CUSTOMERS WOODWAY GROWTH DECEMBER 5753 080.77276 32,930 INSTALL 536 FEET OF 6 INCH ALONG ALTA MESA BOULEVARD IN FORT WORTH. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER 5754 080.77282 88,427 INSTALL 450 FEET OF 4 INCH POLY ALONG WEST KING STREET IN BURLESON AND ABANDON 260 FEET OF 4 INCH AND 150 FEET OF 2 INCH STEEL AND 50 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY SEPTEMBER 5755 080.77286 9,578 PURCHASE ONE ODOR HANDY PLUS WITH CALIBRATION KIT FOR CARROLLTON SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT SEPTEMBER 5756 080.77288 5,978 INSTALL 220 FEET OF 2 INCH POLY ALONG ESTES PARKWAY SOUTH OF I-20 INTERSECTION IN LONGVIEW AND ABANDON 220 FEET OF 2 INCH STEEL. ALL CUSTOMERS LONGVIEW RELOCATION OF FACILITIES SEPTEMBER 5757 080.77291 303,137 INSTALL 775 FEET OF 4 INCH POLY ALONG 4TH STREET AND 350 FEET OF 2 INCH POLY ALONG MARKET STREET IN HONEY GROVE AND ABANDON 770 FEET OF 4 INCH AND 345 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HONEY GROVE SYSTEM INTEGRITY DECEMBER 5758 080.77294 255,179 INSTALL 1,510 FEET OF 4 INCH AND 30 FEET OF 2 INCH POLY ALONG WEST JEFFERSON BOULEVARD AND CALUMET AVENUE IN DALLAS AND ABANDON 1,505 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5759 080.77296 263,463 INSTALL 1,660 FEET OF 2 INCH POLY AND ABANDON 1,195 FEET OF 4 INCH AND 1,695 FEET OF 2 INCH POLY ALONG VIA ESTRELLA AND VIA JAMES JACOB IN DALLAS, DALLAD COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5760 080.77297 863,826 INSTALL 3,745 FEET OF 2 INCH POLY AND ABANDON 3,605 FEET OF 2 INCH STEEL, 50 FEET OF 4 INCH, 70 FEET OF 2 INCH, AND 90 FEET OF 1.25 FEET OF POLY ALONG JEFFERSON BOULEVARD AND CALUMET AVENUE IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5761 080.77302 6,605 INSTALL 1,131 FEET OF 2 INCH POLY ALONG THE STREETS OF FAIRWAYS AT CRYSTAL FALLS IN LEANDER, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER 5762 080.77303 5,014 INSTALL 1,662 FEET OF 2 INCH POLY ALONG THE STREETS OF FAIRWAYS SUBDIVISION IN LEANDER. DEVELOPER INSTALLED FACILTIES. RESIDENTIAL LEANDER GROWTH DECEMBER 5763 080.77305 486,306 INSTALL 2,700 FEET OF 2 INCH POLY ALONG NE STREET AND NORTH ELM STREET IN ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5764 080.77309 16,110 INSTALL 115 FEET OF 4 INCH POLY ALONG CORPORATE DRIVE IN GAINESVILLE. COMMERCIAL OR INDUSTRIAL GAINESVILLE GROWTH OCTOBER 5765 080.77311 163,321 RELOCATE FACILITIES. INSTALL 1,650 FEET OF 2 INCH POLY ALONG SOUTHWEST JOHNSON TO ACCOMMODATE CITY OF BURLESON STREET PROJECT AND ABANDON 1,650 FEET OF 2 INCH POLY AND 270 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY DECEMBER 5766 080.77315 4,096 PURCHASE TWO (2) SENSITS TO BE USED BY C&M IN SOUTHEAST DALLAS AREA. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT JUNE 5767 080.77316 41,500 INSTALL 260 FEET OF 2 INCH ALONG DALE STREET AND CHOCTAW IN STEPHENVILLE. ALL CUSTOMERS STEPHENVILLE GROWTH DECEMBER 5768 080.77319 208,446 RELOCATE FACILITIES. INSTALL 450 FEET OF 6 INCH POLY ALONG HERITAGE TRACE PARKWAY AND ABANDON 450 FEET OF 6 INCH POLY TO ACCOMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER 5769 080.77320 28,223 INSTALL 955 FEET OF 2 INCH POLY ALONG WHITE SETTLEMENT ROAD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER 5770 080.77321 5,699 INSTALL 1,681 FEET OF 4 INCH AND 963 FEET OF 2 INCH POLY ALONG THE STREETS OF CARNEROS RANCH SUBDIVISION IN LEANDER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH OCTOBER 5771 080.77322 134,163 INSTALL 450 FEET OF 2 INCH POLY ALONG ENFIELD STREET IN BRYAN AND ABANDON 450 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY DECEMBER 5772 080.77328 498,466 INSTALL 2,400 FEET OF 4 INCH AND 300 FEET OF 2 INCH POLY ALONG JEFFERSON STREET IN SULPHUR SPRINGS AND ABANDON 190 FEET OF 4 INCH POLY, 285 FEET OF 3 INCH, 1,900 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY DECEMBER 5773 080.77331 22,981 INSTALL 1,420 FEET OF 2 INCH POLY ALONG THE STREETS OF GREENBRIER SUBDIVISION IN BRYAN. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH OCTOBER 5774 080.77333 10,111 PURCHASE AND INSTALL ICE MACHINE FOR GROESBECK SERVICE CENTER IN GROESBECK, LIMESTONE COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER 5775 080.77337 1,545 INSTALL 160 FEET OF 2 INCH POLY IN EASEMENT SOUTH OF 121 IN PLANO. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL PLANO GROWTH SEPTEMBER 5776 080.77340 77,697 INSTALL 900 FEET OF 2 INCH POLY ALONG HAMPTON HILLS SUBDIVISION IN ABILENE. ALL CUSTOMERS ABILENE GROWTH OCTOBER 5777 080.77341 221,281 INSTALL 1,500 FEET OF 2 INCH POLY ALONG WALDRON AVENUE AND BILGLADE ROAD IN FORT WORTH AND ABANDON 1,425 FEET OF 2 INCH STEEL AND 75 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5778 080.77343 46,719 INSTALL 4,250 FEET OF 2 INCH POLY ALONG THE STREETS OF WESTLAKE RANCH SUBDIVISION IN WESTLAKE. RESIDENTIAL WESTLAKE GROWTH DECEMBER MTX Additions Page 164 of 178 383 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5779 080.77348 138,965 INSTALL 900 FEET OF 2 INCH POLY ALONG LOWELL LANE IN FORT WORTH AND ABANDON 900 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5780 080.77351 71,500 ISNTALL 250 FEET OF 4 INCH POLY ALONG NOLAN RIDGE DRIVE IN CLEBURNE AND ABANDON 250 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY DECEMBER 5781 080.77352 11,532 INSTALL RELIEF VALVE ON POTTSBORO CITY GATE AND ABANDON RELIEF VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS POTTSBORO SYSTEM INTEGRITY OCTOBER 5782 080.77354 23,179 INSTALL 225 FEET OF 4 INCH AND 900 FEET OF 2 INCH POLY ALONG HIGHWAY 67 IN SAN ANGELO. COMMERCIAL OR INDUSTRIAL SAN ANGELO GROWTH DECEMBER 5783 080.77357 236,189 INSTALL 900 FEET OF 4 INCH AND 320 FEET OF 2 INCH POLY ALONG STAPLES AVENUE FROM BILGLADE ROAD TO LOWELL LANE AND ABANDON 900 FEET OF 2 INCH POLY AND 250 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5784 080.77360 34,793 INSTALL 230 FEET OF 2 INCH POLY ALONG THE STREETS OF ABILENE. COMMERCIAL OR INDUSTRIAL ABILENE GROWTH DECEMBER 5785 080.77363 19,635 INSTALL 80 FEET OF 4 INCH POLY ANLONG EAST JACK STREET BETWEEN ANDERSON STREET AND SOUTH GALVESTON STREET IN BREMOND IN ACCORDANCE WITH THE RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS BREMOND GROWTH SEPTEMBER 5786 080.77367 30,239 INSTALL 75 FEET OF 4 INCH POLY ALONG MONTAGUE ROAD AT LOVERS LANE IN BOWIE. RESIDENTIAL BOWIE GROWTH DECEMBER 5787 080.77369 181,549 INSTALL 2,700 FEET OF 4 INCH, 2,000 FEET OF 2 INCH POLY ALONG THE STREETS OF OVERLAND GROVE SUBDIVISION IN FORNEY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH DECEMBER 5788 080.77381 11,118 INSTALL 175 FEET OF 2 INCH POLY ALONG SUNSET ROAD IN ROBINSON. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROBINSON GROWTH SEPTEMBER 5789 080.77383 963,540 INSTALL 30 FEET OF 20 INCH STEEL ON LINE D IN DALLAS AND ABANDON 30 FEET OF 20 INCH STEEL. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5790 080.77384 317,390 INSTALL 3,128 FEET OF 2 INCH POLY ALONG FM 2208 IN LONGVIEW AND ABANDON 3,128 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER 5791 080.77387 (18,057) RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 2 INCH POLY EAST OF AVE K AND NORTH OF SPRING CREEK PARKWAY IN PLANO, COLLIN COUNTY. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES DECEMBER 5792 080.77389 35,699 INSTALL 80 FEET OF 4 INCH, 90 FEET OF 2 INCH POLY ALONG INTERSECTION OF RIDGE ROAD AND HIDDEN VALLEY IN ROCKWALL AND ABANDON 70 FEET OF 4 INCH AND 80 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY DECEMBER 5793 080.77392 21,739 INSTALL 900 FEET OF 4 INCH POLY ALONG ROAD TO SIX FLAGS IN ARLINGTON, TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL ARLINGTON GROWTH DECEMBER 5794 080.77393 8,219 INSTALL 1,400 FEET OF 4 INCH POLY ALONG BRIERCROFT COURT IN CARROLLTON. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL CARROLLTON GROWTH SEPTEMBER 5795 080.77394 565,569 RELOCATE FACILITIES. INSTALL 2,530 FEET OF 4 INCH AND 500 FEET OF 2 INCH PO ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5796 080.77395 672,725 INSTALL 4,410 FEET OF 4 INCH AND 4,745 FEET OF 2 INCH POLY ALONG THE STREETS OF HERITAGE VILLAGE SUBDIVISION IN HALTOM CITY, TARRANT COUNTY. RESIDENTIAL HALTOM CITY GROWTH DECEMBER 5797 080.77396 333,234 INSTALL 50 FEET OF 8 INCH STEEL ALONG GREAT SOUTHWEST PARKWAY IN GRAND PRAIRIE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY DECEMBER 5798 080.77398 7,119 INSTALL 750 FEET OF 2 INCH POLY ALONG THE STREETS OF NORTH RICHLAND HILLS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL NORTH RICHLAND HILLS GROWTH DECEMBER 5799 080.77399 27,526 INSTALL 130 FEET OF 2 INCH POLY ALONG SKYE LANE NEAR ALEX IN MIDLOTHIAN. RESIDENTIAL MIDLOTHIAN GROWTH DECEMBER 5800 080.77400 4,519 INSTALL 5,260 FEET OF 2 INCH POLY ALONG THE STREETS OF WOLF RANCH SUBDIVISION IN GEORGETOWN, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER 5801 080.77401 1,212,346 INSTALL 1,625 FEET OF 4 INCH, 3,245 FEET OF 2 INCH POLY ALONG TUMALO TRAIL A ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5802 080.77404 3,618 INSTALL 395 FEET OF 2 INCH POLY ALONG THE STREETS OF TRAVISSO SUBDIVISION IN LEANDER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER 5803 080.77407 20,518 INSTALL 2,086 FEET OF 2 INCH POLY ALONG THE STREETS OF SALERNO SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH SEPTEMBER 5804 080.77414 527,708 INSTALL 610 FEET OF 2 INCH, 1,475 FEET OF 6 INCH POLY ALONG JEFFERSON AND PATTERSON AND ABANDON 989 FEET OF 1.25 INCH, 452 FEET OF 2 INCH, 1,473 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY DECEMBER 5805 080.77415 1,628 PURCHASE ONE NEW MARKER BALL LOCATOR FOR MCKINNEY SERVICE CENTER, MCKINNEY, COLLIN COUNTY. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT DECEMBER 5806 080.77422 196,094 INSTALL 2,000 FEET OF 2 INCH POLY ALONG 2ND STREET FROM AVENUE A TO AVENUE E IN ENNIS AND ABANDON 2,000 OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER 5807 080.77424 22,952 INSTALL 370 FEET OF 2 INCH POLY ALONG THE STREETS OF SAN ANGELO AND ABANDON 250 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER 5808 080.77426 251,397 PURCHASE COMPUTER EQUIPMENT RELATED TO RETURN TO WORK IN DALLAS. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT DECEMBER 5809 080.77427 60,548 INSTALL 80 FEET OF 4 INCH POLY ALONG BLUEBONNET HILLS AND AUSTIN DRIVE IN ENNIS AND ABANDON 80 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER 5810 080.77428 421,779 INSTALL 2,321 FEET OF 2 INCH POLY AND ABANDON 884 FEET OF 2 INCH, 420 FEET OF 1.25 FEET STEEL AND 280 FEET OF 2 INCH AND 20 FEET OF 1.25 FEET POLY ALONG GILMER STREET, ROSS STREET AND 2ND STREET IN KERRVILLE, KERR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY DECEMBER 5811 080.77429 1,015,453 INSTALL 785 FEET OF 4 INCH, 3,115 FEET OF 2 INCH POLY ALONG INSERSOLL STREE ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5812 080.77430 314,048 INSTALL 800 FEET OF 6 INCH POLY ALONG SPRING CREEK PARKWAY IN PLANO AND ABANDON 800 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER 5813 080.77431 31,139 INSTALL 500 FEET OF 2 INCH POLY ALONG RUSH CREEK DRIVE IN ARLINGTON, TARRANT COUNTY. RESIDENTIAL ARLINGTON GROWTH DECEMBER 5814 080.77432 399,396 INSTALL 1,400 FEET OF 4 INCH AND 1,940 FEET OF 2 INCH POLY AND ABANDON 1,985 FEET OF 6 INCH, 1.045 FEET OF 3 INCH, AND 10 FEET OF 2 INCH STEEL AND 290 FEET OF 3 INCH, 10 FEET OF 2 INCH POLY ALONG CLYMER STREET AND NOMAS STREET IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5815 080.77434 225,909 INSTALL 3,205 FEET OF 2 INCH POLY AND ABANDON 1.034 FEET OF 3 INCH, 572 FEET OF 2 INCH STEEL AND 17 FEET OF 4 INCH, 18 FEET OF 3 INCH, 393 FEET OF 2 INCH AND 225 FEET OF 1.25 INCH POLY ALONG NORTH STREET, GILMER STREET, ROSS STREET AND 1ST STREET IN KERR, KERRVILLE COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY DECEMBER 5816 080.77435 553,315 INSTALL 2,020 FEET OF 6 INCH, 220 FEET OF 4 INCH, AND 290 FEET OF 2 INCH POLY AND ABANDON 1,520 FEET OF 6 INCH, 745 FEET OF 4 INCH, 275 FEET OF 2 INCH STEEL AND 60 FEET OF 6 INCH, 35 FEET OF 3 INCH, AND 60 FEET OF 2 INCH POLY ALONG SINGLEON BOULEVARD AND BERNAL DRIVE IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5817 080.77441 38,258 RELOCATE FACILITIES. INSTALL 130 FEET OF 4 INCH POLY ALONG SOUTH 5TH STREET AT THE INTERSECTION OF AZALEA DRIVE IN TEMPLE AND ABANDON 130 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY SEPTEMBER 5818 080.77445 277,093 INSTALL 1,900 FEET OF 4 INCH POLY ALONG LAKE HAVASU TRAIL IN FORT WORTH AND ABANDON 1,375 FEET OF 4 INCH POLY AND 525 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER MTX Additions Page 165 of 178 384 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5819 080.77448 372,467 INSTALL 1,100 FEET OF 2 INCH, 900 FEET OF 4 INCH POLY ALONG OAKLAND BOULEVARD AND BRIDGE STREET AND ABANDON 900 FEET OF 4 INCH, 900 FEET OF 2 INCH STEEL AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5820 080.77451 7,239 PURCHASE THREE (3) NEW SENSIT GOLD CGI'S. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT JUNE 5821 080.77452 4,108 INSTALL 85 FEET OF 2 INCH POLY ON AUSTIN AT 15TH STREET IN WICHITA FALLS AND ABANDON 75 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 5822 080.77456 47,656 INSTALL 322 FEET OF 2 INCH STEEL ALONG WEST 14TH STREET AND ABANDON 322 FEET OF 2 INCH STEELIN BRYAN, BRAZOS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY DECEMBER 5823 080.77459 179,398 INSTALL 1,560 FEET OF 2 INCH POLY ALONG ANTHONY AND BURNETT IN ENNIS AND ABANDON 920 FEET OF 2 INCH STEEL, 200 FEET OF 1.25 INCH, 170 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER 5824 080.77461 185,716 INSTALL 270 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION DRS28 AND ABANDON 60 FEET OF 2 INCH AND 5 FEET OF 3 INCH AND 160 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION DRS28 ALONG THE STREETS OF ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 5825 080.77463 50,956 INSTALL 241 FEET OF 2 INCH POLY ALONG BOB WAY AND CREECHVILLE ROAD IN ENNIS AND ABANDON 241 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER 5826 080.77467 76,204 INSTALL 725 FEET 0F 4 INCH ALONG WASHINGTON DRIVE IN MELISSA. ALL CUSTOMERS MELISSA GROWTH DECEMBER 5827 080.77470 178,951 INSTALL 750 FEET OF 4 INCH POLY ALONG SIERRA STREET IN MESQUITE. ALL CUSTOMERS MESQUITE GROWTH DECEMBER 5828 080.77474 47,753 INSTALL 275 FEET OF 2 INCH POLY ALONG CROCKETT IN CARROLLTON AND ABANDON 275 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY SEPTEMBER 5829 080.77478 108,884 INSTALL 750 FEET OF 6 INCH AND 10 FEET OF 4 INCH POLY ALONG COUNTY ROAD 422/LEONARD DRIVE IN ANNA. ALL CUSTOMERS ANNA GROWTH DECEMBER 5830 080.77487 15,100 PURCHASE AND INSTALL NEW AIR CONDITION UNIT AT PARIS SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JULY 5831 080.77490 36,648 INSTALL 186 FEET OF 2 INCH POLY ALONG FOGG STREET IN FORT WORTH. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER 5832 080.77497 792,720 INSTALL 3,500 FEET OF 12 INCH POLY ALONG THE STREETS OF RIDGE PARK ESTATES SUBDIVISION IN ROYSE CITY, ROCKWALL COUNTY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROYSE CITY GROWTH DECEMBER 5833 080.77498 5,017 INSTALL 900 FEET OF 4 INCH POLY ALONG THE STREETS OF DFW AIRPORT IN EULESS, DALLAS COUNTY. COMMERCIAL OR INDUSTRIAL EULESS GROWTH DECEMBER 5834 080.77501 1,336,856 ADD CNG STATION INSTALLATIONS TO THE FORT WORTH SERVICE CENTER, FORT WORTH, TARRANT COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER 5835 080.77505 96,345 INTALL 24 .75 INCH POLY SERVICE LINES ALONG BRENTWOOD LANE IN FARMERS BRANCH AND ABANDON 25 .75 INCH SERVICE LINES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY DECEMBER 5836 080.77506 618,726 RELOCATE FACILITIES. INSTALL 3,300 FEET OF 4 INCH POLY ALONG STREETS OF WHITE SETTLEMENT, TARRANT COUNTY AND ABANDON 720 FEET OF 2 INCH POLY, 400 FEET OF 2 INCH AND 1,860 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT SYSTEM INTEGRITY DECEMBER 5837 080.77517 106,959 RELOCATE FACILITIES. INSTALL 787 FEET OF 2 INCH POLY ALONG FERNHEATH LANE ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY DECEMBER 5838 080.77519 291,488 INSTALL 1,500 FEET OF 2 INCH POLY ALONG LA SOBRINA IN DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5839 080.77520 505,357 INSTALL 500 FEET OF 4 INCH AND 3,500 FEET OF 2 INCH POLY ALONG BERGEN PLACE AND HEARTLESS PLACE IN FARMERS BRANCH, DALLAS COUNTY AND ABANDON 500 FEET OF 4 INCH, AND 3,500 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY DECEMBER 5840 080.77521 524,542 INSTALL DISTRICT REGULATOR STATION #03 AND 975 FEET OF 4 INCH, 40 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION #03 AND 430 FEET OF 3 INCH STEEL AND 1,200 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL SYSTEM INTEGRITY DECEMBER 5841 080.77523 66,726 INSTALL 850 FEET OF 4 INCH POLY ALONG BELTLINE ROAD IN GRAND PRAIRIE. ALL CUSTOMERS GRAND PRAIRIE GROWTH DECEMBER 5842 080.77526 7,263 INSTALL 305 FEET OF 4 INCH, 3,073 FEET OF 2 INCH POLY ALONG THE STREETS OF BERRY CREEK HIGHLANDS SUBDIVISION IN GEORGETOWN, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER 5843 080.77532 387,650 INSTALL 1,300 FEET OF 4 INCH, 600 FEET OF 2 INCH POLY ALONG ST LAWRENCE IN FORT WORTH AND ABANDON 1,150 FEET OF 4 INCH, 600 FEET OF 2 INCH STEEL AND 150 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5844 080.77533 322,862 INSTALL 1,300 FEET OF 4 INCH AND 120 FEET OF 2 INCH POLY AND ABANDON 1,300 FEET OF 4 INCH STEEL ALONG ST. LAWRENCE ROAD IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5845 080.77534 51,768 INSTALL CATHODIC PROTECTION TEST POINTS ON LINE CA 2ND WEST AND CA 3RD. ALL CUSTOMERS AZLE SYSTEM INTEGRITY SEPTEMBER 5846 080.77540 266,735 INSTALL 5 FEET OF A COMPOSITE ENCIRCLEMENT SLEEVE ALONG LINE D IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 5847 080.77544 27,223 INSTALL 2,800 FEET OF 6 INCH POLY ALONG OAK GROVE ROAD IN FORT WORTH. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER 5848 080.77545 203,779 INSTALL 1,120 FEET OF 4 INCH POLY ALONG CAMELOT ROAD AT ALTAMESA BOULEVARD IN FORT WORTH AND ABANDON 730 FEET OF 2 INCH AND 70 FEET OF 4 INCH POLY. ALL CUSTOMERS FORT WORTH SYSTEM IMPROVEMENT DECEMBER 5849 080.77546 40,175 INSTALL 242 FEET OF 6 INCH POLY ALONG COIT ROAD IN FRISCO. ALL CUSTOMERS FRISCO GROWTH SEPTEMBER 5850 080.77548 275,350 INSTALL DISTRICT REGULATOR STATION #04 ALONG BELTLINE ROAD AND MERRIFIELD DRIVE IN CEDAR HILL AND ABANDON DISTRICT REGULATOR STATION#04 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL SYSTEM INTEGRITY DECEMBER 5851 080.77551 25,709 INSTALL 100 FEET OF 2 INCH POLY ALONG LEDBETTER ROAD IN ARLINGTON. RESIDENTIAL ARLINGTON GROWTH OCTOBER 5852 080.77552 260,763 INSTALL 1,405 FEET OF 2 INCH ALONG WESTMINISTER STREET IN KERRVILLE AND ABANDON 642 FEET OF 2 INCH POLY AND 692 FEET OF STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY DECEMBER 5853 080.77556 159,189 INSTALL 555 FEET OF 2 INCH POLY AND ABANDON 250 FEET OF 2 INCH STEEL AND 315 FEET OF 3 INCH POLY ALONG CHERRYWOOD LANE IN DENTON, DENTON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER 5854 080.77565 3,693 INSTALL 832 FEET OF 6 INCH AND 229 FEET OF 2 INCH POLY ALONG THE STREETS OF BERRY CREEK SUBDIVISION IN GEORGETOWN, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER 5855 080.77566 325,654 INSTALL 4,971 FEET OF 2 INCH AND 570 FEET OF 6 INCH POLY ALONG THE STREETS OF SANDBROCK RANCH SUBDIVISION IN AUBREY, DENTON COUNTY. RESIDENTIAL AUBREY GROWTH DECEMBER 5856 080.77570 763,331 INSTALL 150 SERVICE LINES ALONG THE STREETS OF DUNCANVILLE (MAPSHEET #039) IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY DECEMBER 5857 080.77577 41,520 RELOCATE FACILITIES. INSTALL 60 FEET OF 2 INCH POLY ALONG MISSION RIDGE ROAD IN PLANO AND ABANDON 60 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY DECEMBER 5858 080.77589 5,360 INSTALL 1,300 FEET OF 2 INCH POLY ALONG THE STREETS OF MANSFIELD. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL MANSFIELD GROWTH OCTOBER 5859 080.77594 82,503 INSTALL 3 INCH PLUG VALVE, 8 INCH STOPPLE, 3 INCH STOPPLE AND 2 INCH T.O.R. AND ABANDON NON-OPERABLE 3 INCH PLUG AT RESTLAND STATION ON LINE D IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER MTX Additions Page 166 of 178 385 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5860 080.77595 328,812 INSTALL 1,730 FEET OF 4 INCH, 50 FEET OF 2 INCH POLY ALONG RICHLAND DRIVE IN WACO, MCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 5861 080.77596 484,014 INSTALL 1,700 FEET OF 4 INCH, 360 FEET OF 2 INCH POLY AND ABANDON 1,500 FEET OF 4 INCH AND 60 FEET OF 2 INCH STEEL AND 200 FEET OF 2 INCH AND 300 FEET OF 4 INCH POLY ALONG CANDLEWOOD ROAD IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5862 080.77598 182,567 INSTALL 400 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #01 ALONG 5TH STREET IN FORRESTON AND ABANDON 250 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORRESTON SYSTEM INTEGRITY OCTOBER 5863 080.77605 11,027 INSTALL 720 FEET OF 4 INCH AND 2,870 FEET OF 2 INCH POLY ALONG THE STREETS OF WOODBRIDGE TOWNHOMES IN WYLIE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WYLIE GROWTH DECEMBER 5864 080.77608 12,443 REPLACEMENT DPIR FOR WICHITA FALLS COMPLIANCE. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT JULY 5865 080.77610 543,491 INSTALL 4,800 FEET OF 2 INCH AND 2,400 FEET OF 4 INCH POLY NEAR THE INTERSECTION OF SHELBY AND SHANE OF LAKES AND PARKS OF SOMERCREST SUBDIVISION IN MIDLOTHIAN. RESIDENTIAL MIDLOTHIAN GROWTH OCTOBER 5866 080.77615 177,307 INSTALL 76 FEET OF 8 INCH AND 110 FEET OF 3 INCH POLY AND ABANDON 76 FEET OF 16 INCH STEEL ALONG RECORD CROSSING AND SLEEPY HOLLOW IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5867 080.77616 536,756 INSTALL DISTRICT REGULATOR STATION #01 AND 1,700 FEET OF 4 INCH POLY ALON ALL CUSTOMERS HUTCHINS SYSTEM INTEGRITY DECEMBER 5868 080.77619 12,638 INSTALL 426 FEET OF 4 INCH AND 5,738 FEET OF 2 INCH POLY ALONG THE STREETS OF BLUFFVIEW SUBDIVISION IN LEANDER, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER 5869 080.77621 23,828 INSTALL 1,800 FEET OF 2 INCH POLY ALONG THE STREETS OF SOUTHLAND HILLS SUBDIVISION IN SAN ANGELO. RESIDENTIAL SAN ANGELO GROWTH DECEMBER 5870 080.77633 10,838 PURCHASE TWO (2) ELECTROFUSION PROCESSORS FOR C & M SOUTH REGION DALLAS, DALLAS COUNTY. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT DECEMBER 5871 080.77634 11,434 INSTALL 2 GROVE PILOTS AND 2 MOONEY PILOTS ALONG FM 1082 AND LINE WA JUNCTION FOR ABILENE PRISON AND ABANDON 2 GROVE PILOTS AND 2 MOONEY PILOTS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 5872 080.77637 8,913 INSTALL 25 FEET OF 4 INCH POLY ALONG PRESTON STREET IN DALLAS AND ABANDON 17 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER 5873 080.77643 15,514 REPLACEMENT OF OLD R-22 LENNOX 3-PHASE SYSTEM (HIGH EFFICIENCY GAS FURNACE) IN BELL. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER 5874 080.77647 3,612 PURCHASE ONE (1) MERIAN DIFFERENTIAL METER FOR COMPLIANCE GROUP SOUTH DALLAS REGION, DALLAS COUNTY. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT OCTOBER 5875 080.77648 107,606 INSTALL DISTRICT REGULATOR STATION #14 ALONG AVENUE G AND 18TH STREET IN CISCO AND ABANDON DISTRICT REGULATOR STATION #14 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY DECEMBER 5876 080.77650 52,958 INSTALL 2,238 FEET OF 2 INCH POLY ALONG SOUTHERN POINT SUBDIVISION IN COLLEGE STATION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER 5877 080.77664 245,864 INSTALL 1,460 FEET OF 6 INCH POLY ALONG MAYFIELD ROAD AND STATE HIGHWAY 161 SERVICE ROAD IN GRAND PRAIRIE. ALL CUSTOMERS GRAND PRAIRIE GROWTH DECEMBER 5878 080.77665 23,229 INSTALL 1,330 FEET OF 2 INCH POLY ALONG THE STREETS OF MORNINGSTAR SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER 5879 080.77669 309,297 INSTALL 184 FEET OF 12 INCH STEEL AND ABANDON 132 FEET OF 8 INCH STEEL ALONG THE STREETS OF UNIVERSITY OF TEXAS-DALLAS, RICHARDSON, DALLAS COUNTY. ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES DECEMBER 5880 080.77670 376,739 INSTALL 1,200 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #01 ALONG LITTLE STREET AND 1ST STREET IN WILMER AND ABANDON 1,500 FEET OF 3 INCH POLY AND 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WILMER SYSTEM INTEGRITY DECEMBER 5881 080.77673 219,577 RELOCATE FACILITIES. INSTALL 913 FEET OF 6 INCH AND 224 FEET OF 2 INCH POLY ALONG WESTMORELAND ROAD AND EAGLE DRIVE AND ABANDON 893 FEET OF 6 INCH AND 174 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO SYSTEM INTEGRITY DECEMBER 5882 080.77674 222,246 INSTALL 1,050 FEET OF 4 INCH, 200 FEET OF 2 INCH POLY ALONG CARVER DRIVE FROM HOPKINS STREET TO FORD STREET ALLEY IN GARLAND AND ABANDON 1,300 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5883 080.77675 194,215 INSTALL 970 FEET OF 4 INCH POLY ALONG EAST AVENUE EAST FROM HOPKINS STREET TO SOUTH 1ST STREET IN GARLAND AND ABANDON 840 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5884 080.77686 9,322 INSTALL 276 FEET OF 2 INCH POLY ALONG WRIGHT STREET IN CALDWELL. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL CALDWELL GROWTH OCTOBER 5885 080.77687 26,501 INSTALL 1,800 FEET OF 2 INCH POLY ALONG THE STREETS OF AUSTIN COLONY SUBDIVISION IN BRYAN. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH DECEMBER 5886 080.77688 46,010 INSTALL 465 FEET OF 2 INCH POLY ALONG LEGION DRIVE AND MAIN STREET IN KERRVILLE. COMMERCIAL OR INDUSTRIAL KERRVILLE GROWTH OCTOBER 5887 080.77689 293,253 INSTALL 1.350 FEET OF 2 INCH POLY AND ABANDON 1,350 FEET OF 2 INCH STEEL ALONG CORDELL STREET AND WESTCHESTER STREET IN DENTON, DENTON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER 5888 080.77690 13,268 INSTALL 560 FEET OF 6 INCH POLY ALONG SOUTHPORT PARKWAY IN HUTCHINS, DALLAS COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL WILMER GROWTH DECEMBER 5889 080.77692 182,028 INSTALL 800 FEET OF 2 INCH POLY ALONG GLENBROOK COURT IN GARLAND AND ABANDON 800 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5890 080.77693 2,236,921 INSTALL 24 INCH ACTUATED VALVE ALONG THE STREETS OF GARLAND AND ABANDON 24 INCH VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY DECEMBER 5891 080.77694 299,050 INSTALL 1,400 FEET OF 2 INCH POLY ALONG WILDGROVE DRIVE FROM SOUTH GLENBROOK DRIVE TO SHIRLEY DRIVE IN GARLAND AND ABANDON 1,350 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5892 080.77695 219,553 INSTALL 1,110 FEET OF 2 INCH POLY ALONG WILDGROVE DRIVE FROM MCDONALD DRIVE TO SHIRLEY DRIVE IN GARLAND AND ABANDON 950 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5893 080.77700 219,691 INSTALL 5 FEET OF 2 INCH POLY ALONG STREETS OF SOUTHLAKE AND ABANDON 5 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE SYSTEM INTEGRITY SEPTEMBER 5894 080.77706 22,361 PURCHASE AND INSTALL CARPORT AT THE FORT WORTH SOUTH FACILITY TO STORE POLY PIPE MATERIAL. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JULY 5895 080.77708 475,704 INSTALL 1,070 FEET OF 4 INCH POLY AND ABANDON 1,700 FEET OF 6 INCH STEEL ALONG I-45 HWY AND EAST ILLINOIS AVENUE IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5896 080.77710 331,764 INSTALL 1,660 FEET OF 4 INCH, 300 FEET OF 2 INCH POLY AND ABANDON 1,550 FEET OF 4 INCH, 240 FEET OF 2 INCH STEEL, 115 FEET OF 4 INCH, 60 FEET OF 2 INCH POLY ALONG GREEN RIVER TRAIL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5897 080.77714 470,977 INSTALL 155 FEET OF 2 INCH AND 40 FEET OF 6 INCH POLY IN THE ALLEY WEST OF R ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY DECEMBER 5898 080.77715 833,974 INSTALL 670 FEET OF 2 INCH, 1,120 FEET OF 4 INCH, 280 FEET OF 6 INCH POLY AND ABANDON 1,037 FEET OF 2 INCH, 546 FEET OF 4 INCH, 262 FEET OF 6 INCH STEEL AND 1.097 FEET OF 2 INCH POLY ALONG INTERSECTION OF BETHEL AND OLDHAM IN WAXAHACHIE, ELLIS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY DECEMBER MTX Additions Page 167 of 178 386 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5899 080.77716 354,275 INSTALL 520 FEET OF 2 INCH, 10 FEET OF 4 INCH, 850 FEET OF 6 INCH POLY AND ABANDON 80 FEET OF 2 INCH, 30 FEET OF 4 INCH, 800 FEET OF 6 INCH STEEL ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY DECEMBER 5900 080.77717 390,588 INSTALL 420 FEET OF 2 INCH, 800 FEET OF 4 INCH POLY AND ABANDON 85 FEET OF 2 INCH, 25 FEET OF 4 INCH POLY AND 205 FEET OF 2 INCH, 1,700 FEET OF 4 INCH STEEL ALONG OLDHAM AND FLAT IN WAXAHACHIE, ELLIS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY DECEMBER 5901 080.77721 254,662 INSTALL 3,100 FEET OF 2 INCH POLY AND ABANDON 100 FEET OF 1.25 INCH, 3,000 FEET OF 2 INCH STEEL ALONG OWENS AND LAMPASSAS IN ENNIS, ELLIS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER 5902 080.77724 40,366 INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 2 INCH STEEL ALONG THE RIGHT OF WAY OF ROSA AND ROWE IN ENNIS, ELLIS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER 5903 080.77730 288,559 INSTALL 880 FEET OF 6 INCH, 700 FEET OF 2 INCH POLY AND ABANDON 880 FEET OF 6 INCH, 625 FEET OF 2 INCH STEEL ALONG MILAM AND CHATFIELD IN ENNIS, ELLIS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER 5904 080.77736 49,395 RELOCATE FACILITIES. INSTALL 125 FEET OF 8 INCH POLY ALONG FISHER ROAD IN WICHITA FALLS AND ABANDON POLY MAIN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER 5905 080.77743 58,200 INSTALL 550 FEET OF 2 INCH POLY AND ABANDON 310 FEET OF 1.25 INCH, 160 FEET OF 2 INCH POLY AND 150 FEET OF 2 INCH STEEL ALONG DALLAS AND MADISON IN ENNIS, ELLIS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER 5906 080.77744 864,334 INSTALL 4,200 FEET OF 4 INCH, 1,035 FEET OF 2 INCH POLY ALONG CROCKETT, MAIN AND NELSON STREETS AND ABANDON 3,605 FEET OF 4 INCH, 379 FEET OF 3 INCH, 530 FEET OF 2 INCH STEEL AND 612 FEET OF 4 INCH, 884 FEET OF 2 INCH, 262 FEET OF 1.25 INCH POLY IN DENISON, GRAYSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY DECEMBER 5907 080.77746 73,888 INSTALL 850 FEET OF 2 INCH POLY ALONG EDGEWOOD AND METROPOLITAN IN ENNIS AND ABANDON 500 FEET OF 2 INCH STEEL AND 350 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER 5908 080.77747 25,307 REMOVE AND REPLACE THE DEAD VEGETATION AT CARROLLTON SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER 5909 080.77749 108,392 RELOCATE FACILITIES. INSTALL 760 FEET OF 6 INCH POLY ALONG STATE HIGHWAY 6 IN COLLEGE STATION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES DECEMBER 5910 080.77750 321,102 INSTALL 1,570 FEET OF 4 INCH POLY AND ABANDON 1,465 FEET OF 4 INCH STEEL, 105 FEET OF 4 INCH POLY ALONG SOUTH RIDGE TERRACE IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5911 080.77751 440,357 INSTALL 2,540 FEET OF 4 INCH POLY AND ABANDON 1,678 FEET OF 3 INCH STEEL AND 738 FEET OF 3 INCH POLY ALONG EAST SAUNDERS (FM 814) AND US HWY 69 IN TRENTON, FANNIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY DECEMBER 5912 080.77755 1,573,939 INSTALL 850 FEET OF 2 INCH, 530 FEET OF 4 INCH, 1,625 FEET OF 8 INCH POLY AND ABANDON 640 FEET OF 2 INCH, 380 FEET OF 3 INCH, 475 FEET OF 4 INCH, AND 1,595 FEET OF 8 INCH STEEL ALONG WEBB CHAPEL ROAD IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5913 080.77756 44,920 INSTALL DISTRICT REGULATOR STATION #21 ALONG EAST WILLINGHAM STREET AND COLORADO STREET IN CLEBURNE AND ABANDON DISTRICT REGULATOR STATION #21 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER 5914 080.77760 26,596 INSTALL 275 FEET OF 2 INCH POLY ALONG MURRAY STREET IN DALLAS AND ABANDON 275 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 5915 080.77763 7,282 INSTALL 100 FEET OF 2 INCH POLY ALONG MACARTHUR AND SAM RAYBURN TOLLWAY IN LEWISVILLE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL LEWISVILLE GROWTH SEPTEMBER 5916 080.77764 226,857 INSTALL 55 FEET OF 2 INCH POLY ALONG ROSSER SQUARE IN DALLAS AND ABANDON 980 FEET OF POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5917 080.77768 22,353 PURCHASE NEW AIR CONDITIONING UNIT #2 AT SULPHUR SPRINGS SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER 5918 080.77771 270,298 INSTALL 1,550 FEET OF 4 INCH POLY ALONG FULLER AVENUE AND SOUTH RIDGE TERRACE IN FORT WORTH AND ABANDON 1,370 FEET OF 4 INCH STEEL AND 180 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5919 080.77772 7,989 REPLACED REMOTE TERMINAL UNIT (RTU) IN LEWISVILLE THAT WAS HIT AND BURNED TO THE GROUND BY A CAR. ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY SEPTEMBER 5920 080.77786 (21,055) INSTALL 150 FEET OF 2 INCH POLY AND ABANDON 150 FEET OF 2 INCH STEEL ALONG FM 1033 NORTH OF US 287 IN TXDOT ROAD RIGHT OF WAY IN KIRKLAND, CHILDRESS COUNTY. ALL CUSTOMERS KIRKLAND RELOCATION OF FACILITIES DECEMBER 5921 080.77787 10,689 INSTALL 1,244 FEET OF 4 INCH, 613 FEET OF 6 INCH, 2,501 FEET OF 2 INCH POLY ALONG THE STREETS OF LISSO SUBDIVISION IN PFLUGERVILLE, TRAVIS COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH DECEMBER 5922 080.77790 149,378 INSTALL 300 FEET OF 6 INCH POLY ALONG ESTERS ROAD IN DALLAS AND ABANDON 160 FEET OF 4 INCH STEEL AND 100 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER 5923 080.77791 369,676 INSTALL 2,400 FEET OF 2 INCH POLY ALONG MELITA AVENUE AND OVERTON ROAD IN FORT WORTH AND ABANDDON 1,280 FEET OF 3 INCH AND 1,120 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5924 080.77793 1,009 INSTALL 70 FEET OF 6 INCH AND 507 FEET OF 4 INCH POLY ALONG SPRING CREEK PARKWAY IN PLANO. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL PLANO GROWTH DECEMBER 5925 080.77794 35,799 INSTALL 300 FEET OF 4 INCH POLY ALONG THE STREETS OF RAILHEAD DISTRIBUTION IN FORT WORTH. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH OCTOBER 5926 080.77802 34,042 INSTALL 100 FEET OF 4 INCH POLY ALONG HIGH COUNTRY DRIVE IN CARROLLTON AND ABANDON 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY DECEMBER 5927 080.77808 752,655 INSTALL 2,503 FEET OF 2 INCH POLY ALONG RAVINA DRIVE AND CARROLL DRIVE IN GARLAND AND ABANDON 2,517 FEET OF 2 INCH, 155 FEET OF 1.25 INCH STEEL AND 25 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5928 080.77810 585,208 INSTALL 2,825 FEET OF 2 INCH POLY AND ABANDON 2,800 FEET OF 3 INCH STEEL ALONG THE ALLEY BETWEEN SAN MARCUS AND SAN PAULA IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5929 080.77812 476,218 INSTALL 1,732 FEET OF 2 INCH POLY ALONG BRANCH DRIVE IN GARLAND AND ABANDON 1,706 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5930 080.77813 1,219 INSTALL 170 FEET OF 4 INCH AND 100 FEET OF 2 INCH POLY ALONG DEMOCRACY DRIVE IN PLANO. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL PLANO GROWTH DECEMBER 5931 080.77814 358,575 INSTALL 1,929 FEET OF 2 INCH POLY ALONG WINIFRED DRIVE IN GARLAND AND ABANDON 825 FEET OF 2 INCH, 1,195 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5932 080.77815 373,883 INSTALL 1,562 FEET OF 6 INCH POLY ALONG GLENBROOK DRIVE IN GARLAND AND ABANDON 1,534 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 5933 080.77819 146,992 RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH POLY ALONG LYNWORTH DRIVE ALLEY IN DALLAS AND ABANDON 600 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER MTX Additions Page 168 of 178 387 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5934 080.77821 2,871 INSTALL 2,650 FEET OF 2 INCH AND 150 FEET OF 4 INCH POLY ALONG THE STREETS OF SONOMA VERDE IN MCLENDON-CHISHOLM. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH DECEMBER 5935 080.77823 143,482 INSTALL 1,875 FEET OF 2 INCH POLY AND ABANDON 361 FEET OF 1 INCH, 499 FEET OF 2 INCH, 774 FEET OF 4 INCH STEEL AND 15 FEET OF 4 INCH, 767 FEET OF 2 INCH POLY ALONG 3RD AND AVENUE G IN CHILLICOTHE, HARDEMAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILLICOTHE SYSTEM INTEGRITY DECEMBER 5936 080.77825 186,940 RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY ALONG TOPHILL LANE AND ABANDON 700 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 5937 080.77826 209,751 INSTALL 680 FEET OF 2 INCH, 620 FEET OF 4 INCH POLY ALONG MELITA AND SOUTH RIDGE TERRACE IN FORT WORTH AND ABANDON 580 FEET OF 2 INCH AND 620 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5938 080.77832 32,597 INSTALL 365 FEET OF 2 INCH POLY ALONG HARVEY CIRCLE IN LITTLE ELM RESIDENTIAL LITTLE ELM GROWTH DECEMBER 5939 080.77840 791,883 INSTALL 1,200 FEET OF 6 INCH POLY AT NORTH BRYANT HIGHWAY 87 AND 6TH STREET IN SAN ANGELO AND ABANDON 1,200 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY DECEMBER 5940 080.77842 353,736 INSTALL 1,150 FEET OF 4 INCH POLY ALONG WASHINGTON AND MALONEY STREETS, 500 FEET OF 2 INCH POLY ALONG LIVE OAK STREET AND 10 FEET OF 4 INCH POLY ALONG SYCAMORE STREET AND ABANDON 675 FEET OF 6 INCH, 435 FEET OF 4 INCH, 475 FEET OF 2 INCH STEEL, 10 FEET OF 4 INCH, 380 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY DECEMBER 5941 080.77854 79,017 INSTALL 570 FEET OF 2 INCH POLY ALONG METROPOLITAN AND CHATFIELD IN ENNIS AND ABANDON 470 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER 5942 080.77860 418,217 INSTALL 1,500 FEET OF 6 INCH POLY ALONG W. NEAL AND HUNT STREETS, 75 FEET OF 4 INCH POLY ALONG HUNT STREET AND 375 FEET OF 2 INCH ALONG BOIS D ARC STREET AND ABANDON 350 FEET OF 6 INCH, 965 FEET OF 4 INCH, 625 FEET OF 3 INCH STEEL IN COMMERCE, HUNT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY DECEMBER 5943 080.77865 117,942 INSTALL 40 FEET OF 6 INCH, 1,160 FEET OF 4 INCH AND 40 FEET OF 2 INCH POLY ALO ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY DECEMBER 5944 080.77867 219,524 INSTALL LOW PRESSURE STATION AT BRYAN DISTRICT REGULATOR STATION DRS03 ALONG HASWELL DRIVIE AND ABANDON BRYAN DISTRICT REGULATOR STATION DRS03 IN BRYAN, BRAZOS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY DECEMBER 5945 080.77878 32,749 INSTALL 60 FEET OF 2 INCH POLY ALONG RAQUET CLUB COURT IN ARLINGTON. RESIDENTIAL ARLINGTON GROWTH DECEMBER 5946 080.77893 144,948 INSTALL LOW PRESSUER STATION AT HEARNE DISTRICT REGULATOR STATION DRS02 AND ABANDON HEARNE DISTRICT REGULATOR STATION DRS02 ALONG THE STREETS OF HEARNE, ROBERTSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY DECEMBER 5947 080.77894 135,482 INSTALL LOW PRESSURE STATION AT HEARNE DISTRICT REGULATOR STATION DRS03 AND ABANDON HEARNE DISTRICT REGULATOR STATION DRS03 ALONG THE STREETS OF HEARNE, ROBERTSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY DECEMBER 5948 080.77895 121,255 INSTALL LOW PRESSURE STATION AT HEARNE DISTRICT REGULATOR STATION DRS05 AND ABANDON HEARNE DISTRICT REGULATOR STATION DRS05 ALONG THE STREETS OF HEARNE, ROBERTSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY DECEMBER 5949 080.77897 17,515 INSTALL 282 FEET OF 2 INCH POLY ALONG MIDWAY ROAD IN DALLAS, DALLAS COUNTY. COMMERCIAL OR INDUSTRIAL DALLAS GROWTH DECEMBER 5950 080.77898 54,536 INSTALL 452 FEET OF 2 INCH POLY ALONG HOLLOMAN STREET IN BRYAN AND ABANDON 452 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORMANGEE SYSTEM INTEGRITY DECEMBER 5951 080.77899 120,580 INSTALL 670 FEET OF 4 INCH, 285 FEET OF 2 INCH POLY ALONG BILGLADE AND WES ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5952 080.77905 188,877 RELOCATE FACILITIES. INSTALL 7 SERVICES ALONG CHURCHILL ROAD TO ACCOMMODATE CITY OF FORT WORTH PAVEMENT PROJECT AND ABANDON 7 SERVICES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5953 080.77907 4,561 INSTALL 650 FEET OF 2 INCH POLY ALONG CARTER COURT IN DENISON, GRAYSON COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENISON GROWTH DECEMBER 5954 080.77909 945,669 PERFORM CAPITAL INTEGRITY DIGS ALONG LINE CA (2ND) EAST NEAR FORT WORTH AND INSTALL CLOCKSPRINGS ON DIGS 2017-15 AND 2017-25 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5955 080.77912 188,611 INSTALL 550 FEET OF 2 INCH POLY ALONG WALKER AND CREECHVILLE ROAD IN ENNIS, ELLIS COUNTY AND ABANDON 378 FEET OF 2 INCH STEEL, 272 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER 5956 080.77914 78,053 INSTALL 460 FEET OF 2 INCH POLY ALONG WARREN LANE AND ABANDON 460 FEET OF 3 INCH STEEL IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5957 080.77916 89,264 INSTALL 372 FEET OF 2 INCH POLY AND 120 FEET OF 4 INCH STEEL ALONG SHAWNEE AND CREECHVILLE ROAD IN ENNIS, ELLIS COUNTY AND ABANDON 372 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER 5958 080.77920 193,761 INSTALL 800 FEET OF 2 INCH, 420 FEET OF 4 INCH POLY ALONG CRETON COURT AND CORDONE COURT AND ABANDON 800 FEET OF 2 INCH, 420 FEET OF 4 INCH STEEL IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5959 080.77921 85,353 INSTALL DISTRICT REGULATOR STATION #01, 40 FEET OF 2 INCH POLY ALONG NORTH BEAL STREET AND EAST 5TH AVENUE IN BELTON AND ABANDON DISTRICT REGULATOR STATION #01 AND 40 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY DECEMBER 5960 080.77922 50,784 INSTALL REGULATOR SPOOL WITH RELIEF VALVE ALONG SOUTH MAIN STREET AND EAST AVENUE A IN BELTON AND ABANDON WORKER MONITOR REGULATOR SPOOL AT DISTRICT REGULATOR STATION #23 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY DECEMBER 5961 080.77923 114,821 INSTALL DISTRICT REGULATOR STATION #09, 80 FEET OF 4 INCH AND 2 INCH STEEL ALL CUSTOMERS CAMERON SYSTEM INTEGRITY DECEMBER 5962 080.77924 120,024 INSTALL DISTRICT REGULATOR STATION #01, 50 FEET OF 3 INCH, 50 FEET OF 2 INCH ALL CUSTOMERS LOTT SYSTEM INTEGRITY DECEMBER 5963 080.77925 127,571 INSTALL DISTRICT REGULATOR STATION #02, 50 FEET OF 3 INCH, 50 FEET OF 2 INCH ALL CUSTOMERS LOTT SYSTEM INTEGRITY DECEMBER 5964 080.77926 183,570 INSTALL DISTRICT REGULATOR STATION #04 AND 200 FEET OF 6 INCH POLY ALONG ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER 5965 080.77927 128,737 INSTALL DISTRICT REGULATOR STATION #05 AND 200 FEET OF 6 INCH POLY ALONG ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER 5966 080.77928 46,729 INSTALL DISTRICT REGULATOR STATION #07 ALONG WEST AVENUE L AND SOUTH 21ST STREET IN TEMPLE AND ABANDON DISTRICT REGULATOR STATION #07 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER 5967 080.77929 50,534 INSTALL NEW REGULATOR SPOOL AND RELIEF VALVE AND ABANDON ONE REGULATOR IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER 5968 080.77930 110,372 INSTALL DISTRICT REGULATOR STATION #02, 40 FEET OF 2 INCH AND 40 FEET OF 4 ALL CUSTOMERS CAMERON SYSTEM INTEGRITY DECEMBER 5969 080.77932 40,356 INSTALL REGULATOR SPOOL AND RELIEF VALVE FOR DISTRCT REGULATOR STATION #20 ALONG WEST AVENUE T AND SOUTH 5TH STREET IN TEMPLE AND ABANDON WORKER MONITOR REGULATOR SPOOL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER 5970 080.77933 101,111 INSTALL DISTRICT REGULATOR STATION #21, 40 FEET OF 2 INCH AND 40 FEET OF 4 ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER 5971 080.77934 91,553 INSTALL DISTRICT REGULATOR STATION DRS01, 40 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS01, 80 FEET OF 4 INCH STEEL ALONG THE STREETS OF TROY, BELL COUNTY AND ABANDON DISTRICT REGULATOR STATION DRS01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TROY SYSTEM INTEGRITY DECEMBER 5972 080.77941 23,572 INSTALL 220 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 4 INCH STEEL ALONG ANDERSON DRIVE IN HURST IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY SEPTEMBER MTX Additions Page 169 of 178 388 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 5973 080.77950 12,861 PURCHASE OF MIC TEST EQUIPMENT FOR NEW MIC TECH AT IRVING-ARLINGTON SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT SEPTEMBER 5974 080.77953 18,104 INSTALL 805 FEET OF 2 INCH POLY ALONG DOWLING ROAD IN COLLEGE STATION. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH DECEMBER 5975 080.77960 275,027 INSTALL 1,600 FEET OF 4 INCH POLY AND ABANDON 1,600 FEET OF 4 INCH STEEL ALONG WESTCREEK DRIVE AND CROMART COURT IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5976 080.77961 3,057 RELOCATE FACILITIES. INSTALL 35 FEET OF 4 INCH POLY ALONG THE STREETS OF BRIDGEPORT. ALL CUSTOMERS BRIDGEPORT RELOCATION OF FACILITIES OCTOBER 5977 080.77967 (129,417) INSTALL 780 FEET OF 4 INCH, 831 FEET OF 2 INCH, AND 440 FEET OF 6 INCH POLY ALONG HIDDEN LAKE DRIVE IN PFLUGERVILLE, TRAVIS COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL PFLUGERVILLE GROWTH DECEMBER 5978 080.77969 16,396 PURCHASE NEW AIR CONDITIONING UNIT AT MCKINNEY SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER 5979 080.77970 354,579 INSTALL 600 FEET OF 6 INCH POLY ALONG MCKINNEY STREET IN DENTON AND ABANDON 115 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER 5980 080.77971 158,019 INSTALL 510 FEET OF 4 INCH, 315 FEET OF 2 INCH POLY AND ABANDON 38 FEET OF 4 INCH, 315 FEET OF 2 INCH STEEL ALONG WESTCREEK DRIVE IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5981 080.77972 (5,816) RELOCATE FACILITIES. INSTALL 680 FEET OF 4 INCH POLY ALONG SOUTH OAKES STREET IN SAN ANGELO AND ABANDON 535 FEET OF 4 INCH POLY AND 100 FEET OF 4 INCH STEEL. ALL CUSTOMERS SAN ANGELO RELOCATION OF FACILITIES DECEMBER 5982 080.77985 262,729 INSTALL 1,600 FEET OF 2 INCH POLY AND ABANDON 1,600 FEET OF 3 INCH STEEL ALONG VEGA COURT IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5983 080.77991 47,532 INSTALL MONITORING EQUIPMENT ON DISTRIBUTION SYSTEM AT HARVEST HILL DEVELOPMENT IN NORTHLAKE. ALL CUSTOMERS NORTHLAKE SYSTEM INTEGRITY DECEMBER 5984 080.78001 244,501 RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG CINNABAR AND SYMPHONY IN DALLAS AND ABANDON 100 FEET OF 4 INCH POLY. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES DECEMBER 5985 080.78012 2,869 INSTALL 1,100 FEET OF 2 INCH POLY ALONG WOODBRIDGE TOWNHOMES IN WYLIE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WYLIE GROWTH DECEMBER 5986 080.78014 263,593 INSTALL 1,310 FEET OF 2 INCH, 120 FEET OF 4 INCH POLY AND ABANDON 1,120 FEET OF 2 INCH AND 120 FEET OF 4 INCH POLY AND 190 FEET OF 2 INCH STEEL ALONG WILLOW RIDGE ROAD AND LAKE CHARLES AVENUE IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5987 080.78025 13,770 INSTALL 115 FEET OF 2 INCH POLY ALONG JACKSON STREET IN SAN ANGELO. COMMERCIAL OR INDUSTRIAL SAN ANGELO GROWTH OCTOBER 5988 080.78026 39,645 RELOCATE FACILITIES. INSTALL 384 FEET OF 2 INCH POLY ALONG MORNING GLORY DRIVE IN FREDERICKSBURG. ALL CUSTOMERS FREDERICKSBURG RELOCATION OF FACILITIES OCTOBER 5989 080.78027 5,524 INSTALL 1,300 FEET OF 2 INCH AND 460 FEET OF 4 INCH POLY ALONG THE STREETS OF WOODBRIDGE TOWNHOMES IN WYLIE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WYLIE GROWTH DECEMBER 5990 080.78028 27,832 INSTALL 100 FEET OF 2 INCH POLY ALONG KARNES DRIVE IN ROBINSON IN ACCORDANCE WITH THE RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON GROWTH OCTOBER 5991 080.78030 147,802 INSTALL 600 FEET OF 4 INCH POLY ALONG THE STREETS OF HILLSBORO AND ABANDON 600 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER 5992 080.78042 91,057 INSTALL 1,050 FEET OF 4 INCH POLY ALONG THE STREETS OF SANDY ACRES TOWNHOMES IN FORT WORTH. RESIDENTIAL FORT WORTH GROWTH DECEMBER 5993 080.78047 26,353 INSTALL 1,000 FEET OF 6 INCH POLY ALONG BOAZ RANCH ROAD IN FORT WORTH. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER 5994 080.78049 237,934 INSTALL 1,100 FEET OF 4 INCH POLY AND ABANDON 1,100 FEET OF 4 INCH STEEL ALONG GREEN RIVER TRAIL IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 5995 080.78062 12,838 INSTALL 679 FEET OF 4 INCH POLY ALONG SOUTH FREEWAY IN FORT WORTH, TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER 5996 080.78064 23,360 INSTALL 100 FEET OF 2 INCH POLY ALONG KILLION AND WALNUT HILL IN DALLAS AND ABANDON 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY OCTOBER 5997 080.78075 424,715 RELOCATE FACILITIES. INSTALL 1,160 FEET OF 6 INCH, 680 FEET OF 4 INCH POLY ALONG ROBERTS CUTOFF IN RIVER OAKS, TARRANT COUNTY AND ABANDON 470 FEET OF 2 INCH, 1,110 FEET OF 6 INCH STEEL AND 250 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY DECEMBER 5998 080.78076 18,695 INSTALL 700 FEET OF 2 INCH POLY ALONG MODERA WALSH RANCH SUBDIVISION IN FORT WORTH. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER 5999 080.78081 48,793 INSTALL 250 FEET OF 2 INCH POLY ALONG HUNT STREET IN GORDON AND ABANDON 100 FEET OF 2 INCH AND 150 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORDON SYSTEM INTEGRITY DECEMBER 6000 080.78092 73,735 INSTALL RELIEF VALVES AT ATHENS DISTRICT REGULATOR STATION #02 ALONG SOUTH MURCHISON STREET AND EAST CORSICANA STREET AND DISTRICT REGULATOR STATION #03 ALONG MACK STREET IN ATHENS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY DECEMBER 6001 080.78093 819,592 RELOCATE FACILITIES. INSTALL 150 FEET OF 12 INCH STEEL ALONG FINFEATHER DT LINE AT ESTHER BOULEVARD IN BRYAN AND ABANDON 150 FEET OF 12 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY DECEMBER 6002 080.78098 33,776 INSTALL 165 FEET OF 2 INCH POLY ALONG WEST COLLLINS STREET IN DENISON RESIDENTIAL DENISON GROWTH OCTOBER 6003 080.78102 27,797 INSTALL 510 FEET OF 2 INCH POLY ALONG MASON AT LANCE ROAD IN BOWIE. ALL CUSTOMERS BOWIE GROWTH DECEMBER 6004 080.78104 24,080 RELOCATE FACILITIES. INSTALL 755 FEET OF 4 INCH POLY ALONG NORTH COLLEGE AVENUE AND ABANDON 300 FEET OF 4 INCH STEEL AND 300 FEET OF 2 INCH POLY IN SNYDER, SCURRY COUNTY. ALL CUSTOMERS SNYDER RELOCATION OF FACILITIES DECEMBER 6005 080.78105 52,382 INSTALL DISTRICT REGULATOR STATION #401 ALONG MT. VERNON AVENUE AND MOUNT VIEW AVENUE IN FORT WORTH AND ABANDON DISTRICT REGULATOR STATION #401 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 6006 080.78109 225,013 INSTALL 1,015 FEET OF 4 INCH, 215 FEET OF 2 INCH POLY AND ABANDON 1,015 FEET OF 4 INCH, 215 FEET OF 2 INCH STEEL ALONG GREEN RIVER TRAIL IN FORT WORTH, TARRANT COUNTY, IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 6007 080.78120 11,248 INSTALL 275 FEET OF 2 INCH POLY ALONG HERITAGE AVENUE IN COLLEYVILLE, TARRANT COUNTY. COMMERCIAL OR INDUSTRIAL COLLEYVILLE GROWTH DECEMBER 6008 080.78125 233,750 INSTALL 45 FEET OF 8 INCH POLY ALONG WALNUT AND CENTRAL IN DALLAS AND ABANDON 45 FEET OF 8 INCH STEEL AND INOPERABLE 8 INCH EMR VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 6009 080.78127 91,920 INSTALL 1,500 FEET OF 2 INCH POLY ALONG THE STREETS OF HIGHWOOD VILLAGE IN FORT WORTH. RESIDENTIAL FORT WORTH GROWTH DECEMBER 6010 080.78128 9,008 PURCHASE 3 NEW GARAGE DOOR OPENERS FOR SULPHUR SPRINGS SERVICE CENTER ALL CUSTOMERS SYSTEM WIDE STRUCTURES OCTOBER 6011 080.78129 49,086 INSTALL 3,250 FEET OF 4 INCH POLY ALONG NORTH COWTOWN CROSSING SUBDIVISION IN FORT WORTH. DEVLEOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER 6012 080.78130 1,682 PURCHASE PNEUMATIC AIR DRILLS WITH ADAPTERS FOR WELDER IN SOUTH DALLAS REGION. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT NOVEMBER 6013 080.78131 (12,782) RELOCATE FACILITIES. INSTALL 160 FEET OF 4 INCH POLY ALONG WOODARD AVENUE IN CLEBURNE AND ABANDON 160 FEET OF 4 INCH POLY. ALL CUSTOMERS CLEBURNE RELOCATION OF FACILITIES DECEMBER 6014 080.78133 633,745 INSTALL 1,710 FEET OF 4 INCH, 1,120 FEET OF 2 INCH POLY AND ABANDON 2,830 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG GOLDWOOD AND HAVENWOOD IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 6015 080.78137 (47,439) INSTALL 300 FEET OF 2 INCH POLY ALONG ACCESS ROAD IN HAWLEY. COMMERCIAL OR INDUSTRIAL HAWLEY GROWTH DECEMBER MTX Additions Page 170 of 178 389 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 6016 080.78143 413,590 INSTALL 1,643 FEET OF 4 INCH, 94 FEET OF 2 INCH POLY ALONG AVENUE D FROM FIRST STREET TO THIRD STREET IN GARLAND AND ABANDON 1,064 FEET OF 2 INCH POLY AND 188 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 6017 080.78145 27,178 INSTALL 275 FEET OF 2 INCH POLY ALONG F STREET IN KERRVILLE AND ABANDON 275 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER 6018 080.78146 175,029 INSTALL 997 FEET OF 2 INCH POLY ALONG AVENUE E FROM THIRD STREET TO FIRST STREET IN GARLAND AND ABANDON 990 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 6019 080.78147 252,082 INSTALL 1,443 FEET OF 2 INCH POLY ALONG AVENUE F FROM THIRD STREET TO FIRST STREET IN GARLAND AND ABANDON 1,856 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 6020 080.78149 118,855 RELOCATRE FACILITIES. INSTALL 191 FEET OF 6 INCH AND 227 FEET OF 4 INCH POL ALL CUSTOMERS BURLESON SYSTEM INTEGRITY DECEMBER 6021 080.78150 32,149 INSTALL 100 FEET OF 4 INCH POLY ALONG ARKANSAS LANE IN ARLINGTON. COMMERCIAL OR INDUSTRIAL ARLINGTON GROWTH DECEMBER 6022 080.78153 (113,136) INSTALL 350 FEET OF 2 INCH POLY ALONG MAPLE AVENUE IN DALLAS. RESIDENTIAL DALLAS GROWTH DECEMBER 6023 080.78155 10,186 INSTALL 220 FEET OF 2 INCH POLY ALONG CALHOUN STREET IN EASTLAND. ALL CUSTOMERS EASTLAND SYSTEM INTEGRITY DECEMBER 6024 080.78161 442,641 PURCHASE 14 VMDS (SYSTEM WITH 5' SURVEY BAR, INCLUDES MOUNTING KIT AND PROTECTIVE SHIELD) THROUGHOUT THE MID-TEX DIVISION. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT DECEMBER 6025 080.78163 217,891 PURCHASE 18 SENSIT LZ30'S FOR LEAK INVESTIGATION THROUGHT THE MID-TEX DIVISION. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT SEPTEMBER 6026 080.78167 41,746 INSTALL 4,000 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY ALONG THE STREETS OF MERKEL. COMMERCIAL OR INDUSTRIAL MERKEL GROWTH DECEMBER 6027 080.78168 7,729 PURCHASE COMPUTER, MONITORS, MODEMS AND TRUCK MOUNTING EQUIPMENT FOR ABILENE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT DECEMBER 6028 080.78169 46,546 INSTALL 525 FEET OF 2 INCH POLY ALONG CROCKETT AND CARLTON IN ENNIS AND ABANDON 444 FEET OF 2 INCH STEEL AND 65 FEET OF 2 INCH AND 13 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER 6029 080.78172 659,378 INSTALL 315 FEET OF 4 INCH AND 2,155 FEET OF 2 INCH POLY AND ABANDON 315 FEET OF 4 INCH, 2,155 FEET OF 3 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG THE ALLEY OF IVYWOOD AND HAVENWOOD IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 6030 080.78173 55,679 INSTALL 250 FEET OF 2 INCH POLY ALONG WACO AND CARLTON IN ENNIS AND ABANDON 650 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER 6031 080.78176 240,628 INSTALL 1,250 FEET OF 8 INCH AND 10 FEET OF 2 INCH POLY AND ABANDON 755 FEET OF 3 INCH STEEL ALONG DOUGLAS AND RIGBSY STREETS IN VAN ALSTYNE, GRAYSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY DECEMBER 6032 080.78181 26,463 INSTALL 470 FEET OF 4 INCH AND 1,170 FEET OF 2 INCH POLY ALONG THE STREETS OF ELLISON ESTATES SUBDIVISION IN SAN ANGELO. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SAN ANGELO GROWTH DECEMBER 6033 080.78183 166,078 INSTALL 350 FEET OF 6 INCH POLY ALONG POWER WAY IN MIDLOTHIAN. ALL CUSTOMERS MIDLOTHIAN GROWTH DECEMBER 6034 080.78184 211,319 INSTALL DISTRICT REGULATOR STATION #13 AND 1,200 FEET OF 4 INCH AND 10 FEE ALL CUSTOMERS RANGER SYSTEM INTEGRITY DECEMBER 6035 080.78187 6,478 INSTALL 334 FEET OF 2 INCH POLY ALONG THE STREETS OF TRINITY PLAZA DEVELOPMENT IN TEMPLE. COMMERCIAL OR INDUSTRIAL TEMPLE GROWTH OCTOBER 6036 080.78189 462,128 INSTALL 735 FEET OF 8 INCH, 1,305 FEET OF 2 INCH POLY AND ABANDON 725 FEET OF 8 INCH, 1305 FEET OF 3 INCH STEEL AND 10 FEET OF 8 INCH POLY ALONG CREST RIDGE DR AND CASA VIEW ALLEY IN DALLAS, DALLAS COUNTY, IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 6037 080.78192 169,105 INSTALL 3,720 FEET OF 2 INCH POLY ALONG THE STREETS OF WESTPOINT CROSSING SUBDIVISION IN FORT WORTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER 6038 080.78193 514,666 INSTALL 330 FEET OF 4 INCH AND 2,140 FEET OF 2 INCH POLY AND ABANDON 330 FEET OF 4 INCH, 2,140 FEET OF 3 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG THE ALLEY BETWEEN IVYWOOD AND JADEWOOD NEAR RACINE IN DALLAS, DALLAS COUNTY, IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 6039 080.78194 821,866 INSTALL 2,035 FEET OF 4 INCH AND 1,315 FEET OF 2 INCH POLY AND ABANDON 960 FEET OF 4 INCH, 2,390 FEET OF 3 INCH STEEL ALONG THE ALLEY BETWEEN KIRNWOOD AND JADEWOOD NEAR RACINE IN DALLAS, DALLAS COUNTY, IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 6040 080.78195 18,776 INSTALL 400 FEET OF 2 INCH POLY ALONG VALLEY DRIVE IN NORTH RICHLAND HILLS, TARRANT COUNTY. RESIDENTIAL NORTH RICHLAND HILLS GROWTH DECEMBER 6041 080.78201 33,901 INSTALL 100 FEET OF 2 INCH POLY ALONG STILLHOUSE HOLLOW COURT IN PROSPER. RESIDENTIAL PROSPER GROWTH DECEMBER 6042 080.78204 14,524 INSTALL 1,115 FEET OF 8 INCH, 2,617 FEET OF 6 INCH, 181 FEET OF 4 INCH, AND 3,627 FEET OF 2 INCH POLY ALONG THE STREETS OF SALERNO SUBDIVISION IN ROUND ROCK, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER 6043 080.78205 (12,670) RELOCATE FACILITIES. INSTALL 1,550 FEET OF 2 INCH POLY ALONG BOURLAND LANE IN WICHITA FALLS. ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES NOVEMBER 6044 080.78216 32,030 REPLACE DISTRICT REGULATOR STATION DRS11 RELIEF SPOOL AND VALVE IN IOWA PARK, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY DECEMBER 6045 080.78218 330,623 INSTALL 2,510 FEET OF 4 INCH, 2,990 FEET OF 2 INCH POLY ALONG THE STREETS OF BAILEY PARK SUBDIVISION IN FORT WORTH, TARRANT COUNTY. DEVELOPER INSTALLED FACILIITES. RESIDENTIAL FORT WORTH GROWTH DECEMBER 6046 080.78220 10,986 INSTALL 180 FEET OF 2 INCH POLY ALONG CRETE STREET IN NORMANGEE. RESIDENTIAL NORMANGEE GROWTH DECEMBER 6047 080.78226 5,278 RELOCATE FACILITIES. INSTALL 7 .75 INCH SERVICE LINES ALONG CROSS BEND ROAD AND KNOB HILL IN PLANO AND ABANON 7 .75 INCH SERVICE LINES TO ACCOMMODATE THE CITY OF PLANO'S INSTALLATION OF A SCREENING WALL. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES DECEMBER 6048 080.78229 58,868 INSTALL 400 FEET OF 2 INCH POLY ALONG NORTH CENTRAL AVENUE IN KNOX CITY AND ABANDON 420 FEET 1.25 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KNOX CITY SYSTEM INTEGRITY DECEMBER 6049 080.78230 433,766 INSTALL 1,580 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY ALONG STREETS OF SNYDER AND ABANDON 386 FEET OF 3 INCH AND 1,200 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #14 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY DECEMBER 6050 080.78232 5,430 PURCHASE OF 2 LEAK DETECTORS SENSIT GOLD G2 4- GAS TC CGI COMBUSTIBLE GAS INDICATORS FOR THE FORT WORTH SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT SEPTEMBER 6051 080.78233 148,919 RELOCATE FACILITIES. INSTALL 13 SERVICE LINES ALONG CRAVENS ROAD IN FORT WORTH AND ABANDON 13 SERVICE LINES TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 6052 080.78234 0 ABANDON 2,675 FEET OF 2 INCH POLY ALONG THE STREETS OF GLEN CROSSING IN CELINA. ALL CUSTOMERS CELINA SYSTEM INTEGRITY DECEMBER 6053 080.78247 (1,715) RELOCATE FACILITIES. INSTALL 25 FEET OF 6 INCH POLY ALONG SOUTH MAIN STREET IN MANSFIELD AND ABANDON 15 FEET OF 6 INCH POLY. ALL CUSTOMERS MANSFIELD RELOCATION OF FACILITIES DECEMBER 6054 080.78252 35,394 INSTALL 2,405 FEET OF 4 INCH, 4,540 FEET OF 2 INCH POLY ALONG THE STREETS OF MARINE CREEK RANCH SUBDIVISION IN FORT WORTH, TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER 6055 080.78254 7,838 INSTALL 300 FEET OF 6 INCH POLY ALONG THE STREETS OF NORTHLAKE. COMMERCIAL OR INDUSTRIAL NORTHLAKE GROWTH DECEMBER 6056 080.78256 23,382 INSTALL 1,020 FEET OF 4 INCH POLY ALONG THE STREETS OF FATE VILLAGE IN FATE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FATE GROWTH DECEMBER 6057 080.78257 8,165 INSTALL 500 FEET OF 4 INCH POLY ALONG MARINA BAY IN ROWLETT. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL ROWLETT GROWTH DECEMBER 6058 080.78262 19,749 INSTALL 100 FEET OF 2 INCH POLY ALONG LIMERICK LANE IN GRAPEVINE. RESIDENTIAL GRAPEVINE GROWTH OCTOBER 6059 080.78263 12,098 INSTALL 350 FEET OF 2 INCH POLY ALONG AIRPORT ROAD IN ROCKWALL. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH OCTOBER MTX Additions Page 171 of 178 390 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 6060 080.78264 443,571 INSTALL 2,560 FEET OF 4 INCH AND 5,350 FEET OF 2 INCH POLY ALONG THE STREETS OF NORTHSAR SUBDIVISION IN FORT WORTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER 6061 080.78270 33,011 INSTALL 165 FEET OF 2 INCH POLY ALONG PROSPER TRAIL IN PROSPER, COLLIN COUNTY. COMMERCIAL OR INDUSTRIAL PROSPER GROWTH DECEMBER 6062 080.78283 37,102 INSTALL 100 FEET OF 2 INCH POLY ALONG BRIDAL WREATH LANE IN DALLAS. RESIDENTIAL DALLAS GROWTH DECEMBER 6063 080.78300 350,280 INSTALL 1,865 FEET OF 6 INCH AND 200 FEET OF 2 INCH POLY ALONG ILLINOIS DRIVE AND MAPLE STREET IN CELINA AND ABANDON 250 FEET OF 3 INCH AND 200 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA SYSTEM INTEGRITY DECEMBER 6064 080.78301 359,827 INSTALL 1,338 FEET OF 6 INCH AND 515 FEET OF 2 INCH POLY AND ABANDON 1,450 FEET OF 2 INCH POLY ALONG BEECH STREET AND ILLINOIS DRIVE IN CELINA, COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA SYSTEM INTEGRITY DECEMBER 6065 080.78314 24,534 INSTALL 145 FEET OF 4 INCH POLY ALONG NORTH KENT IN GORMAN. ALL CUSTOMERS GORMAN GROWTH DECEMBER 6066 080.78319 (57,174) INSTALL 450 FEET OF 2 INCH POLY ALONG AUTUMN SLATE DRIVE IN PFLUGERVILLE, WILLIAMSON COUNTY. COMMERCIAL OR INDUSTRIAL PFLUGERVILLE GROWTH DECEMBER 6067 080.78337 102,384 INSTALL 1,349 FEET OF 6 INCH POLY ALONG STREET OF ABILENE, TAYLOR COUNTY. COMMERCIAL OR INDUSTRIAL ABILENE GROWTH DECEMBER 6068 080.78338 30,958 INSTALL 2,790 FEET OF 8 INCH, 361 FEET OF 2 INCH POLY ALONG HWY 195 IN GEORGETOWN, WILLIAMSON COUNTY. COMMERCIAL OR INDUSTRIAL GEORGETOWN GROWTH DECEMBER 6069 080.78344 15,949 INSTALL 285 FEET OF POLY ALONG CLEVELAND STREET IN NORTH ZULCH AND ABANDON 277 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTH ZULCH SYSTEM INTEGRITY SEPTEMBER 6070 080.78345 17,444 INSTALL 130 FEET OF 2 INCH POLY ALONG NORTH MAIN STREET IN CORSICANA. COMMERCIAL OR INDUSTRIAL CORSICANA GROWTH DECEMBER 6071 080.78349 493,105 INSTALL 1,580 FEET OF 6 INCH POLY AND ABANDON 1,510 FEET OF 6 INCH STEEL ALONG GLENBROOK DRIVE ALLEY FROM KINGSLEY ROAD AND BRANCH DRIVE IN GARLAND, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 6072 080.78350 264,820 INSTALL 80 FEET OF 2 INCH, 1,610 FEET OF 6 INCH POLY ALONG EAST GARFIELD STREET AND NORTH 8TH STREET IN TEMPLE AND ABANDON 23 FEET OF 2 INCH, 1,110 FEET OF 4 INCH AND 300 FEET OF STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER 6073 080.78351 24,582 PURCHASE COMPUTER, MONITORS, MODEMS AND TRUCK MOUNTING EQUIPMENT FOR ABILENE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT NOVEMBER 6074 080.78358 10,904 INSTALL 175 FEET OF 2 INCH POLY ALONG CHISHOLM TRAIL IN ROCKWALL. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH DECEMBER 6075 080.78364 73,089 RELOCATE FACILITIES. INSTALL 570 FEET OF 4 INCH POLY AND ABANDON 570 FEET OF 4 INCH POLY ALONG GREENS PRAIRIE TRAIL IN COLLEGE STATION, BRAZOS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY DECEMBER 6076 080.78366 73,330 INSTALL 1,364 FEET OF 4 INCH POLY ALONG THE STREETS OF MIDTOWN RESERVE SUBDIVISION IN COLLEGE STATION, BRAZOS COUNTY. DEVELOPER INSTALLED FACILTIIES. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER 6077 080.78367 107,600 INSTALL 400 FEET OF 6 INCH POLY ALONG HIGHWAY 75 AND ABANDON 400 FEET OF 6 INCH POLY IN MCKINNEY, COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER 6078 080.78374 73,727 INSTALL 420 FEET OF 2 INCH POLY ALONG MASSIE AND HIGH STREET IN THROCKMORTON AND ABANDON 500 FEET OF 1 INCH, 20 FEET OF 2 INCH STEEL AND 487 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THROCKMORTON SYSTEM INTEGRITY DECEMBER 6079 080.78376 4,835 PURCHASE SQUEEZE TOOL AND MULTI-CLAMP KIT FOR DESOTO SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT DECEMBER 6080 080.78378 4,303 ABANDON 104 FEET OF 2 INCH STEEL ALONG POLK AT AVENUE L IN WICHITA FALLS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 6081 080.78379 71,929 INSTALL 125 FEET OF 8 INCH POLY ALONG HEIGHTS BOULEVARD AND FM2181 IN DENTON AND ABANDON 100 FEET OF POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER 6082 080.78384 (331,795) INSTALL 7,400 FEET OF 4 INCH AND 50 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION AND ABANDON 13 FEET OF 4 INCH AND 8 FEET OF 2 INCH POLY ALONG THE STREETS OF WICHITA FALLS, WICHITA COUNTY. ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES DECEMBER 6083 080.78386 3,112 RELOCATE FACILITIES. INSTALL 1,200 FEET OF 4 INCH POLY ALONG FM 548 IN FORNEY AND ABANDON 1,400 FEET OF 4 INCH POLY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FORNEY RELOCATION OF FACILITIES DECEMBER 6084 080.78389 321,805 INSTALL 1,090 FEET OF 4 INCH, 895 FEET OF 2 INCH POLY AND ABANDON 870 FEET OF 3 INCH, 540 FEET OF 2 INCH STEEL AND 450 FEET OF 2 INCH POLY ALONG LEEWOOD STREET AND LAPSLEY STREET IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 6085 080.78396 24,344 INSTALL 1,920 FEET OF 2 INCH POLY ALONG THE STREETS OF OLDHAM OAKS SUBDIVISION IN ABILENE, TAYLOR COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ABILENE GROWTH DECEMBER 6086 080.78398 458,646 INSTALL 575 FEET OF 2 INCH, 2,050 FEET OF 6 INCH POLY AND ABANDON 508 FEET OF 2 INCH STEEL AND 352 FEET OF 4 INCH POLY ALONG BROWN TRAIL AND PAGE STREET IN HURST, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 6087 080.78399 7,376 INSTALL 2,100 FEET OF 4 INCH POLY AND ABANDON 345 FEET OF 4 INCH POLY ALONG THE STREETS OF ABILENE, TAYLOR COUNTY. ALL CUSTOMERS ABILENE RELOCATION OF FACILITIES DECEMBER 6088 080.78400 515,461 INSTALL 350 FEET OF 2 INCH, 1,980 FEET OF 6 INCH POLY AND ABANDON 566 FEET OF 2 INCH, 11 FEET OF 3 INCH, AND 2,867 FEET OF 2 INCH STEEL ALONG BROWN TRAIL AND EAST REDBUD IN HURST, TARRANT COUNTY, IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 6089 080.78401 257,229 INSTALL 2,460 FEET OF 4 INCH POLY AND ABANDON 1,550 FEET OF 3 INCH, 670 FEET OF 4 INCH STEEL AND 123 FEET OF 3 INCH POLY ALONG EAST PECAN, TANGLEWOOD AND EAST REDBUD IN HURST, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 6090 080.78402 365,956 INSTALL 670 FEET OF 2 INCH AND 700 FEET OF 6 INCH POLY AND ABANDON 666 FEET OF 2 INCH AND 990 FEET OF 4 INCH STEEL ALONG EAST PECAN IN HURST, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 6091 080.78404 317,318 INSTALL 900 FEET OF 4 INCH, 880 FEET OF 8 INCH POLY AND ABANDON 839 FEET OF 3 INCH, 766 FEET OF 8 INCH STEEL AND 58 FEET OF 3 INCH POLY ALONG BROOKFIELD DRIVE AND BELLAIRE DRIVE IN HURST, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 6092 080.78415 (7,158) RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH POLY ALONG CABELA DRIVE IN FORT WORTH AND ABANDON 50 FEET OF 6 INCH POLY TO ACCOMMODATE ONCOR MANHOLE INSTALLATION. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES DECEMBER 6093 080.78416 (39,086) RELOCATE FACILITIES. INSTALL 100 FEET OF 8 INCH POLY ALONG WASHINGTON STREET AND COLUMBUS AVENUE IN WACO, MCLENNAN COUNTY AND ABANDON 100 FEET OF 8 INCH STEEL. ALL CUSTOMERS WACO RELOCATION OF FACILITIES DECEMBER 6094 080.78424 939 INSTALL 1,200 FEET OF 4 INCH POLY ALONG MAIN STREET IN ROCKWALL. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL ROCKWALL GROWTH DECEMBER 6095 080.78429 205,944 INSTALL 750 FEET OF 4 INCH POLY AND ABANDON 750 FEET OF 3 INCH STEEL ALONG EAST JEFFERSON STREET TO POLK IN WHITNEY, HILL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITNEY SYSTEM INTEGRITY DECEMBER 6096 080.78431 2,816 PURCHASE OF 2 HILTI BRAND CUT OF SAWS FOR KERRVILLE SERVICE CENTER ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT NOVEMBER 6097 080.78432 2,736 PURCHASE OF 2 SENSIT TRACK IT FOR TEMPLE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT SEPTEMBER 6098 080.78434 5,737 PURCHASE THREE (3) VALVE CHANGERS FOR ROUND ROCK SERVICE CENTER, ROUND ROCK, WILLIAMSON COUNTY. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT DECEMBER MTX Additions Page 172 of 178 391 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 6099 080.78444 398,559 INSTALL 1,777 FEET OF 4 INCH POLY AND ABANDON 1,717 FEET OF 2 INCH STEEL AND 30 FEET OF 2 INCH POLY ALONG RANCH DRIVE ALLEY FROM KINGSLEY ROAD TO BRANCH DRIVE IN GARLAND, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 6100 080.78445 179,386 INSTALL 1,250 FEET OF 2 INCH POLY AND ABANDON 947 FEET OF 4 INCH STEEL ALONG AVENUE F ALLEY FROM THIRD STREET TO FIRST STREET IN GARLAND, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 6101 080.78448 259,970 INSTALL 1,897 FEET OF 2 INCH POLY AND ABANDON 692 FEET OF 4 INCH, 72 FEET OF 2 INCH, 32 FEET OF 1.25 INCH POLY, 442 FEET OF 3 INCH, 513 FEET OF 2 INCH STEEL ALONG FIFTH STREET FROM AVENUE D TO AVENUE F IN GARLAND, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 6102 080.78450 138,012 INSTALL 5,070 FEET OF 2 INCH POLY ALONG THE STREETS OF SOLTERRA SUBDIVISION IN MESQUITE, DALLAS COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MESQUITE GROWTH DECEMBER 6103 080.78456 531,930 INSTALL 2,950 FEET OF 4 INCH, 1,900 FEET OF 2 INCH POLY AND ABANDON 2,950 FEET OF 4 INCH AND 2,160 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF GLENN HEIGHTS DRAINAGE IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLENN HEIGHTS SYSTEM INTEGRITY DECEMBER 6104 080.78464 185,459 INSTALL 1,265 FEET OF 2 INCH POLY AND ABANDON 979 FEET OF 3 INCH STEEL ALONG STATE STREET FROM THIRD STREET TO FIRST STREET IN GARLAND, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 6105 080.78466 24,956 INSTALL 250 FEET OF 2 INCH POLY ALONG HARMON ROAD IN FORT WORTH. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER 6106 080.78472 3,422,012 INSTALL 16 INCH EMR-024B VALVE, 16 INCH EMR VALVE, 24 INCH EMR VALVE AND 10 FEET OF 24 INCH STEEL AND ABANDON 16 INCH EMR-024B VALVE, 16 INCH EMR VALVE, 24 INCH EMR VALVE AND 10 FEET OF 24 INCH STEEL IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 6107 080.78475 12,053 PURCHASE ICE MACHINE FOR THE BRYAN SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER 6108 080.78490 3,487 INSTALL 5 FEET OF 2 INCH POLY ALONG AVENUE L IN WICHITA FALLS AND ABANDON 5 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER 6109 080.78506 417,115 INSTALL 3,311 FEET OF 2 INCH, 429 FEET OF 4 INCH POLY AND ABANDON 252 FEET OF 2 INCH, 1,637 FEET OF 3 INCH, AND 254 FEET OF 2 INCH STEEL AND 500 FEET OF 2 INCH POLY ALONG NORTH 14TH STREET AND NORTH 12TH STREET IN TEMPLE, BELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER 6110 080.78508 190,167 INSTALL 1,250 FEET OF 2 INCH POLY AND ABANDON 950 FEET OF 2 INCH STEEL, 320 FEET OF 2 INCH POLY ALONG LOCUST STREET IN AZLE, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AZLE SYSTEM INTEGRITY DECEMBER 6111 080.78509 510,352 INSTALL 2,242 FEET OF 4 INCH, 189 FEET OF 2 INCH POLY AND ABANDON 1,987 FEET OF 2 INCH STEEL AND 16 FEET OF 2 INCH POLY ALONG MCDONALD DRIVE ALLEY FROM SATURN ROAD TO BRANCH DRIVE IN GARLAND, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 6112 080.78513 22,770 INSTALL 325 FEET OF 4 INCH POLY ALONG FM 1709 IN SOUTHLAKE, TARRANT COUNTY. COMMERCIAL OR INDUSTRIAL SOUTHLAKE GROWTH DECEMBER 6113 080.78519 3,354 INSTALL 1,270 FEET OF 4 INCH POLY ALONG EAST MEADOWS BOULEVARD IN MESQUITE, DALLAS COUMTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL MESQUITE GROWTH DECEMBER 6114 080.78522 8,371 PURCHASE OF 2 AIR MOTOR 90 DEGREE ANGLE DRIVE FOR ABILENE C&M. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT SEPTEMBER 6115 080.78524 7,863 INSTALL 1,085 FEET OF 4 INCH POLY ALONG PLANTERS ROAD IN SUNNYVALE, DALLAS COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL SUNNYVALE GROWTH DECEMBER 6116 080.78526 (71,416) RELOCATE FACILITIES. INSTALL 700 FEET OF 4 INCH POLY ALONG PARK STREET AND CORSICANA HIGHWAY IN HILLSBORO AND ABANDON 335 FEET OF 3 INCH STEEL. ALL CUSTOMERS HILLSBORO RELOCATION OF FACILITIES DECEMBER 6117 080.78528 151,181 INSTALL DISTRICT REGULATOR STATION #36 AND #10 AND 45 FEET OF 4 INCH, 360 F ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY DECEMBER 6118 080.78530 277,342 INSTALL 1,000 FEET OF 6 INCH STEEL AND ABANDON 1,000 FEET OF 6 INCH STEEL FROM STATION 835+08 TO 845+08 IN LAWN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAWN SYSTEM INTEGRITY DECEMBER 6119 080.78536 16,280 PURCHASE NEW EQUIPMENT FOR NEW SERVICE TECHNICIANS IN PLANO SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT SEPTEMBER 6120 080.78545 14,564 INSTALL 90 FEET OF 6 INCH POLY ALONG JOEL EAST BOULEVARD IN FORT WORTH, TARRANT COUNTY. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER 6121 080.78550 4,175 PURCHASE REPLACEMENT ROLL UP DOOR FOR BOWIE SERVICE CENTER FOR DETACHED STORAGE BUILDING. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER 6122 080.78556 4,462 PURCHASE NEW TRAILER FOR HAULING JOHN DEER GATOR FOR MCKINNEY SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT SEPTEMBER 6123 080.78558 6,855 INSTALL 1,838 FEET OF 4 INCH POLY ALONG CRYSTAL FALLS PARKWAY IN LEANDER. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL LEANDER GROWTH DECEMBER 6124 080.78559 22,477 INSTALL 250 FEET OF 2 INCH POLY ALONG THE STREETS OF PSW SUBDIVISION IN PLANO. RESIDENTIAL PLANO GROWTH DECEMBER 6125 080.78560 4,841 INSTALL 1,026 FEET OF 4 INCH POLY ALONG KELLEY DRIVE IN GEORGETOWN, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL GEORGETOWN GROWTH DECEMBER 6126 080.78570 190,853 INSTALL 370 FEET OF 2 INCH AND 850 FEET OF 4 INCH POLY AND ABANDON 370 FEET OF 2 INCH, 850 FEET OF 4 INCH STEEL ALONG EAST OAK DRIVE IN HURST, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER 6127 080.78581 102,658 INSTALL 560 FEET OF 2 INCH POLY ALONG EAST RENFRO AND EAST ELLISON STREET IN BURLESON AND ABANDON 1,120 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY DECEMBER 6128 080.78586 23,087 RELOCATE FACILITIES. INSTALL 135 FEET OF 2 INCH POLY ALONG HIGHWAY 82 AND TEXOMA PARKWAY IN SHERMAN AND ABANDON 2 INCH STEEL RISER AND DOUBLE METER LOOP. ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES DECEMBER 6129 080.78588 3,229 PURCHASE 2 LOCATOR MARKER BALL GAS RYCOMM FOR GARLAND CENTRAL FCC'S. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT SEPTEMBER 6130 080.78589 581,329 INSTALL 2,650 FEET OF 2 INCH POLY ALONG MCNEIL AND SCYENE IN DALLAS AND ABANDON 2,650 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 6131 080.78595 7,583 RELOCATE FACILITIES. INSTALL 275 FEET OF 2 INCH POLY ALONG ENTERPRISE WAY IN GREENVILLE AND ABANDON 17 FEET OF 2 INCH POLY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS GREENVILLE RELOCATION OF FACILITIES DECEMBER 6132 080.78607 407 INSTALL 535 FEET OF 2 INCH POLY ALONG THE STREETS OF WILLOW BEND POLO ESTATES SUBDIVISION IN PLANO, COLLIN COUNTY. RESIDENTIAL PLANO GROWTH DECEMBER 6133 080.78608 247,289 INSTALL 300 FEET OF 4 INCH AND 1,900 FEET OF 2 INCH POLY AND ABANDON 262 FEET OF 4 INCH, 6 FEET OF 3 INCH POLY AND 68 FEET OF 4 INCH, 1,333 FEET OF 3 INCH, 111 FEET OF 2 INCH STEEL ALONG THE INTERSECTION OF NORTH 10TH STREET AND EAST IRVIN AVENUE IN TEMPLE, BELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER 6134 080.78609 26,452 INSTALL 1,285 FEET OF 6 INCH, 1,440 FEET OF 4 INCH AND 3,235 FEET OF 2 INCH POLY ALONG THE STREETS OF LIBERTY HILLS SUBDIVISION IN FORT WORTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER 6135 080.78613 465,892 INSTALL 955 FEET OF 4 INCH AND 1,400 FEET OF 2 INCH POLY AND ABANDON 940 FEET OF 6 INCH, 1,400 FEET OF 3 INCH STEEL AND 55 FEET OF 6 INCH POLY ALONG THE ALLEY OF SHILOH AND MAYHEW IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 6136 080.78615 13,125 INSTALL 100 FEET OF 2 INCH POLY ALONG GREEN COURT IN ATHENS. RESIDENTIAL ATHENS GROWTH DECEMBER 6137 080.78618 61,137 INSTALL 540 FEET OF 2 INCH POLY ALONG THE SHAHAN DRIVE IN SHADY SHORES. RESIDENTIAL SHADY SHORES GROWTH DECEMBER 6138 080.78621 75,067 INSTALL 250 FEET OF 3 INCH, 250 FEET OF 2 INCH POLY AND ABANDON 250 FEET OF 3 INCH, 250 FEET OF 2 INCH STEEL IN MOODY, MCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MOODY SYSTEM INTEGRITY DECEMBER MTX Additions Page 173 of 178 392 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 6139 080.78622 485,148 INSTALL 365 FEET OF 4 INCH AND 1,610 FEET OF 2 INCH POLY AND ABANDON 480 FEET OF 6 INCH AND 1,650 FEET OF 3 INCH STEEL ALONG THE ALLEY OF SHILOH AND DUNAWAY IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 6140 080.78629 175,529 INSTALL 175 FEET OF 4 INCH, 850 FEET OF 2 INCH POLY ALONG KELLY BED IN WAXAHACHIE, ELLIS COUNTY. COMMERCIAL OR INDUSTRIAL WAXAHACHIE GROWTH DECEMBER 6141 080.78630 24,590 INSTALL 750 FEET OF 4 INCH STEEL AND REGULATOR STATION IN FORT WORTH, TARRANT COUNTY. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER 6142 080.78634 190,478 INSTALL 2,750 FEET OF 2 INCH, 1,040 FEET OF 4 INCH POLY ALONG THE STREETS OF PLEASANT VALLEY SUBDIVISION IN WYLIE, COLLIN COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WYLIE GROWTH DECEMBER 6143 080.78647 34,618 INSTALL 100 FEET OF 2 INCH POLY ALONG SHADY GROVE ROAD IN KELLER. RESIDENTIAL KELLER GROWTH DECEMBER 6144 080.78648 38,108 INSTALL 190 FEET OF 2 INCH POLY ALONG NORTH CROCKETT STREET IN FREDERICKSBURG, GILLESPIE COUNTY. RESIDENTIAL FREDERICKSBURG GROWTH DECEMBER 6145 080.78649 490,893 INSTALL 1,741 FEET OF 6 INCH, 60 FEET OF 2 INCH POLY AND ABANDON 680 FEET OF 6 INCH, 200 FEET OF 4 INCH, AND 425 FEET OF 2 INCH STEEL ALONG PINE STREET AND ANSON AVENUE IN ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 6146 080.78658 (16,904) INSTALL 195 FEET OF 2 INCH POLY ALONG YAUPON STREET IN FREDERICKSBURG, GILLESPIE COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FREDERICKSBURG GROWTH DECEMBER 6147 080.78659 162,234 RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY ALONG THOMPSON DRIVE AND ABANDON 250 FEET OF 4 INCH STEEL IN RICHARDSON, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY DECEMBER 6148 080.78665 369,360 INSTALL 1,830 FEET OF 4 INCH, 4,795 FEET OF 2 INCH POLY ALONG THE STREETS OF BAILEY PARK SUBDIVISION IN FORT WORTH, TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER 6149 080.78668 202,786 INSTALL 930 FEET OF 2 INCH POLY AND ABANDON 632 FEET OF 2 INCH, 54 FEET OF 1.25 INCH STEEL AND 61 FEET OF 2 INCH AND 73 FEET OF 1.25 INCH POLY ALONG WEST JOHNSON STREET IN DENISON, GRAYSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY DECEMBER 6150 080.78676 5,045 INSTALL 375 FEET OF 2 INCH POLY IN RIGHT OF WAY ON ASPEN COURT IN WESTLAKE, TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WESTLAKE GROWTH DECEMBER 6151 080.78677 64,634 RELOCATE FACILITIES. INSTALL 175 FEET OF 4 INCH POLY ALONG ROOSEVELT AVENUE AND ABANDON 165 FETE OF 4 INCH STEEL TO ACCOMODATE CITY ALLEY PAVING PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 6152 080.78678 84,104 INSTALL 1,200 FEET OF 4 INCH POLY ALONG WEST WINTERGREEN RD AND NORTH DUNCANVILLE RD IN DUNCANVILLE, DALLAS COUNTY. COMMERCIAL OR INDUSTRIAL DUNCANVILLE GROWTH DECEMBER 6153 080.78691 33,303 INSTALL 240 FEET OF 4 INCH POLY ALONG NORTH HWY 77 AND TRIUMPH IN WAXAHACHIE, ELLIS COUNTY. COMMERCIAL OR INDUSTRIAL WAXAHACHIE GROWTH DECEMBER 6154 080.78697 654,132 RELOCATE FACILITIES. INSTALL 1,665 FEET OF 2 INCH, 350 FEET OF 4 INCH POLY AND ABANDON 1,660 FEET OF 2 INCH, 200 FEET OF 3 INCH AND 150 FEET OF 4 INCH STEEL ALONG HUGHES LANE IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 6155 080.78705 1,207,358 INSTALL 1,800 FEET OF 6 INCH POLY AND ABANDON 1,800 FEET OF 6 INCH STEEL ALONG RIGHT OF WAY CROSSING BRAZOS RIVER AND LAKE SHORE DRIVE IN WACO, MCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 6156 080.78708 2,648 INSTALL 200 FEET OF 2 INCH POLY ALONG SWEET STREET IN SOUTHLAKE, TARRANT COUNTY. RESIDENTIAL SOUTHLAKE GROWTH DECEMBER 6157 080.78709 3,322 INSTALL 300 FEET OF 2 INCH POLY ALONG 4TH AND DEWITT IN SACHSE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SACHSE GROWTH DECEMBER 6158 080.78713 406,559 INSTALL 1,255 FEET OF 2 INCH, 350 FEET OF 4 INCH, 1,295 FEET OF 6 INCH POLY AND ABANDON 1,525 FEET OF 6 INCH STEEL ALONG HOUSTON AVENUE, AND MAIN STREET IN TEMPLE, BELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER 6159 080.78720 521,040 INSTALL 2,760 FEET OF 6 INCH, 1,550 FEET OF 4 INCH, AND 8.970 FEET OF 2 INCH POLY ALONG THE STREETS OF WALSH RANCH SUBDIVISION IN FORT WORTH, TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER 6160 080.78727 19,193 PURCHASE 12 ELECTROFUSION TOOLS, 1 GUILLOTINE, 1 12" PEELER, 2 TOP LOAD CLAMPS, 2 LINE UP CLAMPS FOR ROUND ROCK SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT DECEMBER 6161 080.78728 8,797 INSTALL 220 FEET OF 2 INCH POLY ALONG BEATY ROAD IN SAN ANGELO. RESIDENTIAL SAN ANGELO GROWTH DECEMBER 6162 080.78732 18,057 INSTALL 240 FEET OF 2 INCH POLY ALONG JUPITER STREET IN GARLAND. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL GARLAND GROWTH DECEMBER 6163 080.78739 38,820 INSTALL 5 FEET OF 4 INCH NEAR THE INTERSECTION OF AVENUE A AND WEST MULBERRY STREET IN DENTON AND ABANDON 5 FEET OF 4 INCH POLY. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER 6164 080.78741 94,917 INSTALL 17 FARM TAPS BETWEEN KC29 AND KC30 IN CLYDE AND ABANDON 17 FARM TAPS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLYDE SYSTEM INTEGRITY DECEMBER 6165 080.78744 15,050 INSTALL 5,086 FEET OF 2 INCH POLY ALONG THE STREETS OF COTTONWOOD CREEK SUBDIVISION IN HUTTO, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH DECEMBER 6166 080.78757 532,139 INSTALL 165 FEET OF 12 INCH STEEL AND ABANDON 140 FEET OF 12 INCH STEEL ALONG CHESTER AND MISSISSIPPI IN WICHITA FALLAS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 6167 080.78769 1,543 PURCHASE OF DIGITAL GAUCE FOR COMPLIANCE IN WACO SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT DECEMBER 6168 080.78781 7,006 REPLACE RELIEF VALVE ON DISTRICT REGULATOR STATION #24 ALONG HIGHWAY 93 IN BELTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY DECEMBER 6169 080.78797 306,546 INSTALL 3,340 FEET OF 4 INCH, 4,215 FEET OF 2 INCH POLY ALONG THE STREETS OF BRIDGEVIEW SUBDIVISION IN FORT WORTH, TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER 6170 080.78806 20,879 RELOCATE FACILITIES. INSTALL 371 FEET OF 2 INCH POLY ALONG GREGG STREET AND ABANDON 48 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALVERT SYSTEM INTEGRITY SEPTEMBER 6171 080.78810 14,981 INSTALL 5 FEET OF 2 INCH POLY ALONG ELM STREET IN ALVORD AND ABANDON 5 FEET OF 2 INCH POLY ALL CUSTOMERS ALVORD SYSTEM INTEGRITY DECEMBER 6172 080.78823 84,534 RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH POLY AND ABANDON 500 FEET OF 2 INCH POLY ALONG ROE STREET AND CENTRAL DIRVE IN AZLE, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AZLE SYSTEM INTEGRITY DECEMBER 6173 080.78825 121,554 INSTALL 2,300 FEET OF 4 INCH, 4,300 FEET OF 2 INCH POLY ALONG THE STREETS OF ERIN HILLS AND OAK HILL IN RED OAK, ELLIS COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL RED OAK GROWTH DECEMBER 6174 080.78831 130,697 INSTALL 524 FEET OF 2 INCH POLY AND ABANDON 277 FEET OF 2 INCH POLY AND 213 FEET OF 2 INCH AND 204 FEET OF 4 INCH STEEL ALONG SOUTH LANE STREET, WEST SHOEMAKER AND WEST WARD IN DECATUR, WISE COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY DECEMBER 6175 080.78832 82,160 RELOCATE FACILITIES. INSTALL 520 FEET OF 2 INCH POLY AND ABANDON 315 FEET OF 2 INCH STEEL ALONG THE STREETS OF GRANDVIEW, JOHNSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANDVIEW SYSTEM INTEGRITY DECEMBER 6176 080.78847 17,190 PURCHASE PIPE AND CABLE LOCATOR FOR ATHENS COMPLIANCE, 2 MARKER BALL LOCATOR FOR CORSICANA SERVICE CENTER, 2 FOOTAGE C400 FOR GARLAND SERVICE CENTER, AND 2 PUMPS FOR SQEEZE TOOLS FOR GROESBECK SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT DECEMBER 6177 080.78849 229,744 INSTALL ERCON MATTING TO REMEDIATE EXPOSURES ON XT6-3 AND XT6-5 IN DESOTO, DALLAS COUNTY. ALL CUSTOMERS DESOTO PIPELINE INTEGRITY DECEMBER 6178 080.78865 121,778 INSTALL 2,135 FEET OF 2 INCH, 950 FEET OF 4 INCH, 500 FEET OF 6 INCH POLY ALONG THE STREETS OF SOLTERRA SUBDIVISION IN MESQUITE, DALLAS COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MESQUITE GROWTH DECEMBER MTX Additions Page 174 of 178 393 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 6179 080.78867 110,189 INSTALL 375 FEET OF 2 INCH POLY ALONG EAST 2ND STREET AND MAIN STREET IN RHOME AND ABANDON 211 FEET OF 2 INCH, 126 FEET OF 4 INCH STEEL AND 8 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RHOME SYSTEM INTEGRITY DECEMBER 6180 080.78868 28,153 INSTALL TWO (2) AC UNITS AT ABILENE SERVICE CENTER ON ARNOLD BOULEVARD AND ABANDON TWO (2) AC UNIT AT ABILENE SERVICE CENTER, ABILENE, TAYLOR COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER 6181 080.78872 41,455 INSTALL 100 FEET OF 2 INCH POLY ALONG HATTIE STREET IN TERRELL. RESIDENTIAL TERRELL GROWTH DECEMBER 6182 080.78877 225,839 INSTALL 750 FEET OF 4 INCH POLY ALONG BAIRD STREET IN CLEBURNE AND ABANDON 7870 FEET OF 4 INCH STEEL AND 130 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY DECEMBER 6183 080.78890 286,349 DALLAS PROJECT WORK NEEDED INCLUCING CONSTRUCTION, CABLING, FURNITURE AND MISCELLANEOUS FOR 17TH AND 18TH FLOOR AT LINCOLN CENTRE IN DALLAS, DALLAS COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER 6184 080.78892 280,592 INSTALL 550 FEET OF 4 INCH POLY ALONG NORTH MAIN STREET AND ABANDON 535 FEET OF 6 INCH STEEL IN PARIS, LAMAR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY DECEMBER 6185 080.78895 10,236 INSTALL FLOWSAFE RELIEF VALVE AND ABANDON DEAD WEIGHT RELIEF VALVE ON DISTRICT REGULATOR STATION DRS70 IN ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 6186 080.78896 7,082 INSTALL RELIEF VALVE AT BRYAN DISTRICT REGULATOR STATION DRS34 AT THE INTERSECTION OF MILLS AND EAST 27TH STREET IN BRYAN, BRAZOS COUNTY AND ABANDON RELIEF VALVE AT BRYAN DISTRICT REGULATOR STATION DRS34 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY DECEMBER 6187 080.78898 225,756 INSTALL DISTRICT REGULATOR STATION DRS03, 25 FEET OF 4 INCH, 25 FEET OF 2 INCH POLY NEAR THE INTERSECTION OF NORTH ALAMO STREET AND WEST BELL STREET IN BARTLETT, BELL COUNTY AND ABANDON 10 FEET OF 3 INCH, 20 FEET OF 4 INCH STEEL AND 3 FEET OF 3 INCH POLY AND DISTRICT REGULATOR STATION DRS03 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BARTLETT SYSTEM INTEGRITY DECEMBER 6188 080.78906 160,216 INSTALL 900 FEET OF 4 INCH, 3,680 FEET OF 2 INCH POLY ALONG THE STREETS OF NORTHSTAR SUBDIVISION IN FORT WORTH, TARRANT COUNTY. RESIDENTIAL FORT WORTH GROWTH DECEMBER 6189 080.78916 6,798 INSTALL GATE OPERATOR ON SOUTH (LEFT) GATE AT ATHEN SERVICE CENTER, ATHENS, HENDERSON COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER 6190 080.78926 8,345 INSTALL A DAIKEN AC UNIT IN LARGE CONFERENCE ROOM AT WAXAHACHIE SERVICE CENTER, WAXAHACHIE, ELLIS COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER 6191 080.78937 32,354 INSTALL 12 INCH SPLIT SLEEVE ALONG PHILLIP AND BANK STREET IN DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER 6192 080.78957 219,814 INSTALL 1,520 FEET OF 2 INCH, 110 FEET OF 4 INCH POLY ALONG NORTH RIDGE ROAD, TEE HEAD DRIVE AND GREENFIELD ROAD IN FORT WORTH, TARRANT COUNTY AND ABANDON 90 FEET OF 4 INCH, 415 FEET OF 2 INCH STEEL AND 825 FEET OF 2 INCH AND 180 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 6193 080.78966 4,278 INSTALL INTERCOM SYSTEM FOR FRONT DOOR AT CARROLLTON SERVICE CENTER, CARROLLTON, DENTON COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER 6194 080.78971 160,750 RELOCATE FACILITIES. INSTALL 415 FEET OF 6 INCH AND 25 FEET OF 3 INCH POLY AND ABANDON 360 FEET OF 6 INCH AND 90 FEET OF 4 INCH STEEL ALONG THE RIGHT OF WAY OF NORTH PEARL STREET BETWEEN WEST 11TH AVENUE AND WEST 10TH AVENUE IN BELTON, BELL COUNTY. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER 6195 080.78977 275,468 INSTALL 310 FEET OF 2 INCH, 1,712 FEET OF 4 INCH POLY ALONG EAST IRVIN, EAST HOUSTON AVENUE, EAST FRENCH STREET IN TEMPLE, BELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER 6196 080.78978 316,802 INSTALL 1,730 FEET OF 2 INCH, 320 FEET OF 4 INCH POLY AND ABANDON 326 FEET OF 3 INCH, 280 FEET OF 4 INCH POLY AND 617 FEET OF 4 INCH STEEL ALONG EAST FRENCH AVENUE AND NORTH 4TH STREET IN TEMPLE, BELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER 6197 080.78979 229,417 INSTALL 950 FEET OF 2 INCH, 250 FEET OF 4 INCH POLY AND ABANDON 1,250 FEET OF 2 INCH STEEL ALONG DOGWOOD TRAIL IN LANCASTER, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY DECEMBER 6198 080.78981 264,149 INSTALL 1,600 FEET OF 4 INCH, 600 FEET OF 2 INCH POLY AND ABANDON 1,600 FEET OF 4 INCH, 500 FEET OF 4 INCH, 160 FEET OF 2 INCH STEEL ALONG COLLEGE HILLS STREET IN SAN ANGELO, TOM GREEN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY DECEMBER 6199 080.78983 82,252 INSTALL 418 FEET OF 2 INCH POLY AND ABANDON 368 FEET OF 2 INCH STEEL AND 50 FEET OF 2 INCH POLY IN ROCHESTER, HASKELL COUNTY. ALL CUSTOMERS ROCHESTER RELOCATION OF FACILITIES DECEMBER 6200 080.78992 162,616 RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG TOPHILL LANE ALLEY AND ABANDON 900 FEET OF 3 INCH STEEL TO ACCOMODATE THE CITY OF DALLAS ALLEY PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 6201 080.79000 252,247 RELOCATE FACILITIES. INSTALL 500 FEET OF 8 INCH POLY TO BE ROAD RIGHT OF WAY AT WINDING MEADOWS AND CANYON MAPLE ROAD AND ABANDON 456 FEET OF 8 INCH POLY IN NORTHLAKE, DENTON COUNTY. ALL CUSTOMERS NORTHLAKE RELOCATION OF FACILITIES DECEMBER 6202 080.79001 50,549 INSTALL 400 FEET OF 4 INCH POLY ALONG FM 91 AND 2379 AND ABANDON 400 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ODELL SYSTEM INTEGRITY DECEMBER 6203 080.79002 33,947 INSTALL 1,500 FEET OF 2 INCH POLY IN OAK POINT, DENTON COUNTY. COMMERCIAL OR INDUSTRIAL DENTON GROWTH DECEMBER 6204 080.79004 71,708 INSTALL 400 FEET OF 4 INCH POLY ALONG SAINTSBURY DRIVE IN DALLAS, DALLAS COUNTY. ALL CUSTOMERS DALLAS GROWTH DECEMBER 6205 080.79005 2,711 INSTALL 430 FEET OF 2 INCH POLY ALONG THE STREETS OF WOODBRIDGE VILLAGE SUBDIVISION IN SACHSE. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL SACHSE GROWTH DECEMBER 6206 080.79011 29,740 INSTALL 630 FEET OF 4 INCH POLY ALONG MEACHAM BOULEVARD IN FORT WORTH, TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER 6207 080.79022 4,919 PURCHASE OF OFFICE FURNITURE FOR KERRVILLE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER 6208 080.79023 191,085 INSTALL 150 FEET OF 4 INCH POLY ALONG FM 664 AND UHL ROAD IN GLENN HEIGHTS, ELLIS COUNTY. COMMERCIAL OR INDUSTRIAL GLENN HEIGHTS GROWTH DECEMBER 6209 080.79034 28,419 PURCHASE 2 SMART SENSIT CAL-360 STATIONS AND 5 SENSIT G2 LEAK DETECTORS FOR ARLINGTON-IRVING SERVICE CENTERS. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT SEPTEMBER 6210 080.79037 13,351 INSTALL REMOTE TERMINAL UNIT, POWER, AND CONTROLS FOR SCADA COMMUNICATION TO MONITOR PRESSURE ON THE NORTH EAST END OF ABILENE, TAYLOR COUNTY, ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER 6211 080.79039 101,783 INSTALL 900 FEET OF 2 INCH POLY ALONG THE STREETS OF WESLEY COURTS IN ABILENE, TAYLOR COUNTY. RESIDENTIAL ABILENE GROWTH DECEMBER 6212 080.79064 122,872 RELOCATE FACILITIES. RELOCATE TWENTY ONE .75 POLY SERVICES ALONG ALLEY BETWEEN HUNTINGTON AND LAWLER IN GARLAND, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER 6213 080.79065 26,187 INSTALL 150 FEET OF 4 INCH POLY ALONG CRESS GARDEN LANE IN FORNEY. RESIDENTIAL FORNEY GROWTH DECEMBER 6214 080.79068 (72,712) INSTALL 169 FEET OF 6 INCH POLY AND 6 INCH FLOWSIC500 METER ALONG THE STREETS OF FARMERSVILLE, COLLIN COUNTY. COMMERCIAL OR INDUSTRIAL FARMERSVILLE GROWTH DECEMBER 6215 080.79072 80,064 INSTALL 120 FEET OF 6 INCH POLY ALONG DUNCANVILLE ROAD IN DESOTO, DALLAS COUNTY. ALL CUSTOMERS DESOTO GROWTH DECEMBER 6216 080.79073 21,711 INSTALL 70 FEET OF 4 INCH POLY ALONG ELM STREET IN MCKINNEY, COLLIN COUNTY. COMMERCIAL OR INDUSTRIAL MCKINNEY GROWTH DECEMBER 6217 080.79077 4,949 INSTALL 406 FEET OF 2 INCH POLY ALONG GRAND AVENUE PARKWAY IN PFLUGERVILLE, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL PFLUGERVILLE GROWTH DECEMBER 6218 080.79081 7,302 INSTALL 285 FEET OF 2 INCH POLY ALONG MERLOT DRIVE IN GRAPEVINE, TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL GRAPEVINE GROWTH DECEMBER 6219 080.79083 39,572 INSTALL 12 INCH SLEEVE ALONG PERRY AND BANK STREET IN DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER MTX Additions Page 175 of 178 394 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 6220 080.79117 28,734 INSTALL 12 FEET OF 6 INCH POLY ALONG ALMA DRIVE AND ABADNON 8 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF PLANO SEWER AND STREET PROJECT IN PLANO, COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY DECEMBER 6221 080.79126 864,781 INSTALL 2,281 FEET 6 INCH, 202 FEET 4 INCH, 814 FEET 2 INCH AND ABANDON 2,200 FEET 6 INCH, 160 FEET 3 INCH, 150 FEET 2 INCH STEEL AND 50 FEET 4 INCH, 50 FEET 1.25 INCH POLY ALONG AVENUE A AND 33RD STREET IN SNYDER, SCURRY COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY DECEMBER 6222 080.79130 70,022 INSTALL 1,050 FEET OF 2 INCH POLY ALONG THE STREETS OF MT. ZION AND KEY WAY IN MIDLOTHIAN, ELLIS COUNTY. RESIDENTIAL MIDLOTHIAN GROWTH DECEMBER 6223 080.79137 126,042 INSTALL DISTRICT REGULATOR STATION DRS06, 10 FEET OF 6 INCH, 80 FEET OF 2IN CH, AND 40 FEET OF 4 INCH POLY AND ABANDON 10 FEET OF 6 INCH, 10 FEET OF 2 INCH, AND 40 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION DRS06 AT INTERSECTION OF ELIZABETH BOULEVARD AND S RAUPE LANE IN GRANBURY, HOOD COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY DECEMBER 6224 080.79150 138,330 INSTALL 600 FEET OF 2 INCH, 10 FEET OF 6 INCH POLY AND ABANDON 600 FEET OF 2 INCH, 10 FEET OF 6 INCH STEEL ALONG GULF STREET IN CLARKSVILLE, RED RIVER COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLARKSVILLE SYSTEM INTEGRITY DECEMBER 6225 080.79156 17,482 INSTALL 50 FEET OF 2 INCH POLY ALONG COLE AND 6TH IN BELLEVUE AND ABANDON 50 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELLEVUE SYSTEM INTEGRITY DECEMBER 6226 080.79159 238,734 INSTALL DISTRICT REGULATOR DRS06 AT THE INTERSECTION OF EAST OLIVER AND NORTH SWENSON IN STAMFORD, JONES COUNTY AND ABANDON DISTRICT REGULATOR STATION DRS06 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY DECEMBER 6227 080.79161 15,312 INSTALL 100 FEET OF 2 INCH POLY ALONG BROKEN CREST DRIVE IN DESOTO, DALLAS COUNTY. ALL CUSTOMERS DESOTO GROWTH DECEMBER 6228 080.79177 93,025 INSTALL 100 FEET OF 4 INCH POLY ALONG SH 31 IN CORSICANA, NAVARRO COUNTY. COMMERCIAL OR INDUSTRIAL CORSICANA GROWTH DECEMBER 6229 080.79180 121,852 CASING DIG 2019-02 AT STATION 285+60 ON LINE CA(3RD). REPLACE CASING VENTS ON BOTH SIDES IN AZLE, TARRANT COUNTY. ALL CUSTOMERS AZLE PIPELINE INTEGRITY DECEMBER 6230 080.79183 19,541 INSTALL 100 FEET OF 4 INCH POLY ALONG WEST LOOP 306 IN SAN ANGELO, TOM GREEN COUNTY. COMMERCIAL OR INDUSTRIAL SAN ANGELO GROWTH DECEMBER 6231 080.79184 142,792 INSTALL 350 FEET OF 2 INCH POLY AND ABANDON 300 FEET OF 1.25 INCH POLY ALONG ALAN D DALE CIRCLE IN DENTON, DENTON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER 6232 080.79187 68,505 INSTALL 250 FEET OF 4 INCH POLY IN RIGHT OF WAY ON JOHNSON ROAD IN KELLER, TARRANT COUNTY. ALL CUSTOMERS KELLER SYSTEM INTEGRITY DECEMBER 6233 080.79209 63,694 RELOCATE FACILITIES. INSTALL 550 FEET OF 2 INCH POLY AND ABANDON 550 FEET OF 2 INCH STEEL ALONG FRONT AND ELM STREET IN ARLINGTON, TARRANT COUNTY TO ACCOMMODATE THE CITY OF ARLINGTON DRAINAGE AND PAVING PLAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER 6234 080.79217 3,733 INSTALL 1,722 FEET OF 4 INCH POLY ALONG WILLIAMS DRIVE IN GEORGETOWN, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL GEORGETOWN GROWTH DECEMBER 6235 080.79219 4,365 INSTALL 455 FEET OF 4 INCH POLY ALONG NEWSOME ROAD IN MESQUITE, DALLAS COUNTY. COMMERCIAL OR INDUSTRIAL MESQUITE GROWTH DECEMBER 6236 080.79220 23,320 INSTALL SECURITY CARD ACCESS SYSTEM AT ARLINGTON SERVICE CENTER AND ABANDON SECURITY CARD ACCESS SYSTEM AT ARLINGTON SERVICE CENTER, ARLINGTON, TARRANT COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER 6237 080.79226 65,358 RELOCATE FACILITIES. INSTALL 690 FEET OF 2 INCH POLY AND ABANDON 580 FEET OF 2 INCH STEEL ALONG QUAIL TRAIL IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 6238 080.79228 82,139 RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH, 60 FEET OF 4 INCH POLY AND ABANDON 50 FEET OF 6 INCH AND 60 FEET OF 4 INCH STEEL ALONG NEWTON DRIVE IN BURLESON, JOHNSON COUNTY TO ACCOMMODATE CITY OF BURLESON PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY DECEMBER 6239 080.79253 3,570 INSTALL DISTRICT REGULATOR STATION DRS07 RELIEF VALVE ALONG INTERSECTION OF SOUTH AUSTIN AVENUE AND W FIFTH STREET IN GEORGETOWN, WILLIAMSON COUNTY AND ABANDON DISTRICT REGULATOR STATION DRS07 RELIEF VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY DECEMBER 6240 080.79276 2,788 PURCHASE 2 INCH - 6 INCH PEELER FOR ROCKWALL DISTRICT, ROCKWALL, WILLIAMSON COUNTY. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT DECEMBER 6241 080.79280 215,851 INSTALL 1,380 FEET OF 2 INCH, 1,070 FEET OF 4 INCH POLY ALONG THE STREETS OF THE STATION SUBDIVISION IN SACHSE, DALLAS COUNTY. RESIDENTIAL SACHSE GROWTH DECEMBER 6242 080.79288 846 INSTALL 235 FEET OF 4 INCH POLY AND ABANDON 235 FEET OF 4 INCH POLY ALONG THE STREETS OF GREENWAY SUBDIVISION IN CELINA, COLLIN COUNTY. ALL CUSTOMERS CELINA RELOCATION OF FACILITIES DECEMBER 6243 080.79331 28,932 PURCHASE FOUR (4) LOCATOR EQUIPMENT FOR DALLAS SERVICE CENTER, DALLAS, DALLAS COUNTY. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT DECEMBER 6244 080.79371 629,660 CAPITAL REMEDIATION LINE CUT OUT ON LINE C16(EAST)AND STOPPLEING REQUIRED TO COMPLETE THE CUT OUT IN IRVING, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER 6245 080.79374 180,797 RELOCATE FACILITIES. INSTALL 1,070 FEET OF 4 INCH POLY AND ABANDON 1,070 FEET OF 2 INCH STEEL ALONG THE STREETS OF FORT WORTH TO ACCOMODATE CITY OF FORT WORTH SANITARY SEWER PROJECT IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER 6246 080.79388 40,569 INSTALL 330 FEET OF 4 INCH POLY ALONG INDEPENDENCE PARKWAY IN PLANO, COLLIN COUNTY AND ABANDON 330 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY DECEMBER 6247 080.79409 92,098 INSTALL 2,600 FEET OF 2 INCH POLY ALONG THE STREETS OF HARVEST PHASE SUBDIVISION IN NORTHLAKE, DENTON COUNTY. RESIDENTIAL NORTHLAKE GROWTH DECEMBER 6248 080.79411 637,538 INSTALL 1,900 FEET OF 8 INCH, 600 FEET OF 4 INCH AND 120 FEET OF 2 INCH POLY AND ABANDON 845 FEET OF 6 INCH, 80 FEET OF 3 INCH STEEL AND 60 FEET OF 6 INCH, 1,000 FEET OF 4 INCH, 80 FEET OF 2 INCH POLY ALONG COLLEGE HILL BOULEVARD IN SAN ANGELO IN TOM GREEN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY DECEMBER 6249 080.79421 13,031 INSTALL 100 FEET OF 2 INCH POLY ALONG SOUTH MONROE STREET IN CAMPBELL, HUNT COUNTY. RESIDENTIAL CAMPBELL GROWTH DECEMBER 6250 080.79424 236,141 INSTALL 1,125 FEET OF 2 INCH POLY AND ABANDON 1,420 FEET OF 2 INCH STEEL ALONG VALENCIA IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 6251 080.79433 8,893 INSTALL 900 FEET OF 4 INCH POLY ALONG THE STREETS OF VICTORY AT BASSWOOD IN FORT WORTH, TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES. COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER 6252 080.79440 123,182 INSTALL 338 FEET OF 6 INCH AND 97 FEET OF 4 INCH POLY AND ABANDON 338 FEET OF 6 INCH POLY AND 98 FEET OF 4 INCH POLY ALONG WASHINGTON AVENUE IN BRYAN, BRAZOS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY DECEMBER 6253 080.79446 65,372 INSTALL 100 FEET OF 2 INCH POLY ALONG SOUTH CENTER IN ARLINGTON, TARRANT COUNTY. COMMERCIAL OR INDUSTRIAL ARLINGTON GROWTH DECEMBER 6254 080.79485 7,605 INSTALL RELIEF VALVE ON DISTRICT REGULATOR STATION DRS21 AT THE INTERSECTION OF WILLOW AND NORTH JACKSON IN SAN ANGELO, TOM BEAN COUNTY AND ABANDON RELIEF VALVE ON DISTRICT REGULATOR STATION DRS21 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY DECEMBER 6255 080.79489 3,016 INSTALL 90 FEET OF 2 INCH POLY ALONG THE STREETS OF HASKELL, HASKELL COUNTY. RESIDENTIAL HASKELL GROWTH DECEMBER 6256 080.79518 27,803 INSTALL 130 FEET OF 4 INCH POLY ALONG LOGAN DRIVE IN MANSFIELD, TARRANT COUNTY. ALL CUSTOMERS MANSFIELD SYSTEM IMPROVEMENT DECEMBER MTX Additions Page 176 of 178 395 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 6257 080.79519 16,908 PURCHASE OF PRESSURE RECORDING EQUIPMENT FOR DISTRICT REGULATOR STATION PROJECT IN ROGERS, BELL COUNTY. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT DECEMBER 6258 080.79524 35,336 INSTALL 80 FEET OF 4 INCH POLY ALONG DOWNTOWN STREET OF ABILENE, TAYLOR COUNTY. COMMERCIAL OR INDUSTRIAL ABILENE GROWTH DECEMBER 6259 080.79529 65,727 INSTALL DISTRICT REGULATOR STATION DRS05, 80 FEET OF 4 INCH AND 40 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS05, 40 FEET OF 3 INCH STEEL, 40 FEET OF 2 INCH AND 40 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY DECEMBER 6260 080.79546 64,469 INSTALL 350 FEET OF 4 INCH POLY AND ABANDON 350 FEET OF 4 INCH POLY ALONG ENTERPRISE STREET IN ATHENS, HENDERSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY DECEMBER 6261 080.79551 33,894 INSTALL 173 FEET OF 4 INCH POLY ALONG VALLEY VIEW DRIVE IN KERRVILL, KERR COUNTY. RESIDENTIAL KERRVILLE GROWTH DECEMBER 6262 080.79553 230,837 INSTALL ADDITIONAL CONCRETE PAVING AT ROUND ROCK WAREHOUSE ALONG CHISOLM TRAIL, ROUND ROCK, WILLIAMSON COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER 6263 080.79557 98,166 INSTALL 600 FEET OF 2 INCH POLY AND 120 FEET OF 4 INCH STEEL AND ABANDON 110 FEET OF 2 INCH POLY AND 490 FEET OF 2 INCH STEEL ALONG EARLY BOULEVARD IN EARLY, BROWN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EARLY SYSTEM INTEGRITY DECEMBER 6264 080.79565 105,371 INSTALL 440 FEET OF 4 INCH, 10 FEET OF 2 INCH POLY AND ABANDON 440 FEET OF 6 INCH, 5 FEET OF 2 INCH STEEL ALONG MESQUITE STREET IN COLEMAN, COLEMAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY DECEMBER 6265 080.79573 61,896 INSTALL 250 FEET OF 2 INCH POLY ALONG WHITLEY ROAD IN WATAUGA, TARRANT COUNTY. RESIDENTIAL WATAUGA GROWTH DECEMBER 6266 080.79575 97,958 INSTALL 500 FEET OF 4 INCH, 120 FEET OF 2 INCH, 20 FEET OF 1.25 INCH POLY AND ABANDON 500 FEET OF 8 INCH, 120 FEET OF 2 INCH AND 20 FEET OF 1.25 INCH STEEL ALONG 11TH STREET IN CARLSBAD, TOM GREEN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARLSBAD SYSTEM INTEGRITY DECEMBER 6267 080.79617 107,398 INSTALL DISTRICT REGULATOR STATION DRS06 AND 40 FEET OF 2 INCH, 120 FEET OF 4 INCH POLY AND NEW HIGH FLOW STATION 2X4 STATION AND ABANDON 20 FEET OF 3 INCH, 55 FEET OF 4 INCH STEEL AND 65 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION DRS06 ALONG EAST 6TH STREET AND CEDAR STREET IN COLORADO CITY, MITCHELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLORADO CITY SYSTEM INTEGRITY DECEMBER 6268 080.79655 13,490 INSTALL 325 FEET OF 2 INCH POLY AND ABANDON 80 FEET OF 3 INCH, 240 FEET OF 2 INCH STEEL ALONG 1ST STREET IN MILES, RUNNELS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILES SYSTEM INTEGRITY DECEMBER 6269 080.79657 5,458 INSTALL 900 FEET OF 4 INCH, 300 FEET OF 2 INCH POLY ALONG SH 114 IN GRAPEVINE, TARRANT COUNTY. COMMERCIAL OR INDUSTRIAL GRAPEVINE GROWTH DECEMBER 6270 080.79694 9,068 PURCHASE PRESSURE RECORDING DEVICES FOR WEST LP DISTRICT REGULATOR STATION 01 AND MARLIN LP DISTRICT REGULATOR STATION 01 IN MARLIN, FALLS COUNTY. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT DECEMBER 6271 080.79704 5,325 INSTALL 4 INCH VALVE LOCATED AT WICHITA FALLS WEST CITY GATE ALONG SEYMOUR HIGHWAY IN WICHITA FALLS, WICHITA COUNTY AND ABANDON EMR-107 VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER 6272 080.79706 170,742 INSTALL 880 FEET OF 6 INCH, 120 FEET OF 2 INCH, 80 FEET OF 4 INCH POLY AND ABANDON 860 FEET OF 6 INCH, 120 FEET OF 2 INCH STEEL ALONG PAINT ROCK ROAD IN SAN ANGELO, TOM GREEN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY DECEMBER 6273 080.79727 40,606 INSTALL 40 FEET OF 4 INCH, 10 FEET OF 2 INCH POLY AND ABANDON 40 FEET OF 4 INCH, 10 FEET OF 2 INCH STEEL ALONG THE STREETS OF CISCO IN CISCO, EASTLAND COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY DECEMBER 6274 80.79731 144,327 INSTALL 2 STOPPLES AND 5 FEET OF 10-INCH STEEL MAIN NEAR ALVARADO TO ELIMINATE LEAK ON LINE M IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALVARADO SYSTEM INTEGRITY DECEMBER 6275 080.79744 84,058 INSTALL 400 FEET OF 4 INCH, 100 FEET OF 6 INCH POLY AND ABANDON 400 FEET OF 3 INCH, 100 FEET OF 6 INCH STEEL IN ALLEY SOUTH OF 6TH AT ELBERT STREET IN QUANAH, HARDEMAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY DECEMBER 6276 080.79772 2,835 PUCHASE PLOTTER FOR DENTON SERVICE CENTER IN DENTON, DENTON COUNTY. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT DECEMBER 6277 080.79781 90,821 INSTALL 20 FEET OF 4 INCH, 170 FEET OF 2 INCH POLY AND ABANDON 20 FEET OF 4 INCH AND 170 FEET OF 2 INCH STEEL ALONG THE STREETS OF DE LEON, COMANCHE COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DE LEON SYSTEM INTEGRITY DECEMBER 6278 080.79808 16,245 INSTALL 100 FEET OF 2 INCH POLY ALONG MILL RUN ROAD IN ATHENS, HENDERSON COUNTY. RESIDENTIAL ATHENS GROWTH DECEMBER 6279 080.79824 4,256 INSTALL 60 FEET OF 6 INCH POLY ALONG EASEMENT EAST OF STERLITE STREET IN ENNIS, ELLIS COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ENNIS GROWTH DECEMBER 6280 080.79842 180 INSTALL 5 FEET OF 2 INCH POLY AND ABANDON 85 FEET OF 2 INCH STEEL ALONG AVENUE C IN DENTON, DENTON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROSS ROADS SYSTEM INTEGRITY DECEMBER 6281 080.79846 161,567 INSTALL DISTRICT REGLATOR STATION DRS38, NEW REGULATOR AND RELIEF VALVE, AND 25 FEET OF 2 INCH, 25 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS38 AT INTERSECTION OF GURLEY AVENUE AND SOUTH 21ST STREET IN WACO, MCCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER 6282 080.79851 22,630 INSTALL 405 FEET OF 2 INCH POLY ALONG SHELTON DRIVE IN FORT WORTH, TARRANT COUNTY. RESIDENTIAL FORT WORTH GROWTH DECEMBER 6283 080.79856 579,770 INSTALL 80 FEET OF 6 INCH POLY AND ABANDON 50 FEET OF 6 INCH POLY, 15 FEET OF 6 INCH STEEL ALONG OAK STREET IN DENTON, DENTON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER 6284 080.79865 1,329 PURCHASE VALVE CHANGE WITH RUBBER 3/4 PLCS., VALVE CHANGER TOP DRIVE NUT 3/4 PLCS, AND STUFFING BOX 1/2-3/4 VALVE CHANGER PLACES FOR MESQUITE SERVICE CENTER, DALLAS COUNTY. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT DECEMBER 6285 080.79901 24,174 INSTALL 5 FEET OF 2 INCH POLY AND ABANDON 5 FEET OF 2 INCH POLY ALONG SOUTH MAIN STREET IN RHOME, WISE COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RHOME SYSTEM INTEGRITY DECEMBER 6286 080.79933 564,098 INSTALL COMPOSITE REPAIR SLEEVES ON LINE D (D9 JCT TO D1 JCT) DIG 2019-025 (STA. 4181+70), DIG 2019-025B (STA. 4181+87), AND DIG 2019-025C (STA. 4176+88) IN DALLAS, DALLAS COUNTY. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 6287 080.79938 2,934 INSTALL 10 INCH SPLIT SLEEVE ALONG GOODWIN AT DELMAR IN DALLAS, DALLAS COUNTY AND ABANDON SERVICE TAP IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER 6288 080.79944 22,814 INSTALL 624 FEET OF 2 INCH POLY ALONG FM 148 IN CRANDALL, KAUFMAN COUNTY. ALL CUSTOMERS CRANDALL GROWTH DECEMBER 6289 080.79963 22,413 INSTALL 170 FEET OF 2 INCH POLY ALONG WEISENBERGER AVENUE IN FORT WORTH, TARRANT COUNTY. RESIDENTIAL FORT WORTH GROWTH DECEMBER 6290 080.79982 19,687 INSTALL 200 FEET OF 2 INCH POLY ALONG I-35 AND OVILLA ROAD IN RED OAK, ELLIS COUNTY. COMMERCIAL OR INDUSTRIAL RED OAK GROWTH DECEMBER 6291 080.80084 58,602 INSTALL 50 FEET OF 2 INCH POLY AND ABANDON 40 FEET OF 2 INCH POLY ALONG JOHN KENNEDY AT LEATHERHEAD IN SAGINAW, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY DECEMBER 6292 080.80088 47,880 INSTALL CONNECTING CONCRETE DRIVEWAY FROM SIDE EXIT TO FRONT ENTRANCE AT HILLSBORO SERVICE CENTER IN HUBBARD, HILL COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER 6293 080.80121 2,439 INSTALL A NEW BARCO UNIT AT DENTON SERVICE CENTER, DENTON, DENTON COUNTY. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT DECEMBER 6294 080.80169 1,617 INSTALL 5 FEET OF 2 INCH POLY AND ABANDON 5 FEET OF 2 INCH POLY ALONG HOUSTON STREET IN TERRELL, KAUFMAN COUNTY. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY DECEMBER 6295 080.80174 256,851 INSTALL 250 FEET OF 6 INCH, 5 FEET OF 4 INCH, 65 FEET OF 2 INCH POLY ALONG GREGG STREET AND HAYNES STREET IN DENTON, DENTON COUNTY. ALL CUSTOMERS DENTON SYSTEM IMPROVEMENT DECEMBER 6296 080.80302 57,374 PURCHASE EIGHT (8) LOCATOR EQUIPMENT FOR DALLAS SERVICE CENTER, DALLAS, DALLAS COUNTY. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT DECEMBER MTX Additions Page 177 of 178 396 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 6297 080.80369 5,124 INSTALL GAINESVILLE SERVICE CENTER SIGN IN GAINESVILLE, COOKE COUNTY AND ABANDON GAINESVILLE SERVICE CENTER SIGN. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER 6298 080.80448 13,437 INSTALL ONE (1) AC UNIT IN ABILENE SERVICE CENTER IN ABILENE, TAYLOR COUNTY AND ABANDON ONE (1) AC UNIT IN ABILENE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER 6299 TOTAL MTX ADDITIONS (LN. 1 - LN. 6298) 1,063,846,551 6300 6301 6302 NOTES: 6303 (1) The "COST" column reflects the capitalized portion of the cost only. 6304 (2) The "DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CALENDAR YEAR 2022" column describes capitalized costs only. MTX Additions Page 178 of 178 397 Item 10. ATMOS ENERGY CORP., MID-TEX DIVISION INTERIM RATE ADJUSTMENT APPLICATION PROJECT REPORT 2022 ADDITIONS BY FERC ACCOUNT 398 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.33345 38000 0 080 190 - Mid-Tex Gas Division Addition 080.33346 38000 0 080 190 - Mid-Tex Gas Division Addition 080.33347 38000 873 080 190 - Mid-Tex Gas Division Addition 080.33348 38000 1 080 190 - Mid-Tex Gas Division Addition 080.33349 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.33349 38000 0 080 190 - Mid-Tex Gas Division Addition 080.33350 38000 0 080 190 - Mid-Tex Gas Division Addition 080.33351 38000 0 080 190 - Mid-Tex Gas Division Addition 080.33352 38000 0 080 190 - Mid-Tex Gas Division Addition 080.33353 37602 0 080 190 - Mid-Tex Gas Division Addition 080.33354 37602 0 080 190 - Mid-Tex Gas Division Addition 080.33355 37602 0 080 190 - Mid-Tex Gas Division Addition 080.33356 37602 0 080 190 - Mid-Tex Gas Division Addition 080.33357 37602 0 080 190 - Mid-Tex Gas Division Addition 080.33358 37602 63 080 190 - Mid-Tex Gas Division Addition 080.33359 37601 0 080 190 - Mid-Tex Gas Division Addition 080.33359 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.33360 37602 0 080 190 - Mid-Tex Gas Division Addition 080.33487 37602 711 080 190 - Mid-Tex Gas Division Addition 080.33487 38000 115 080 190 - Mid-Tex Gas Division Addition 080.33492 37602 201 080 190 - Mid-Tex Gas Division Addition 080.33492 38000 35 080 190 - Mid-Tex Gas Division Addition 080.33502 37602 234 080 190 - Mid-Tex Gas Division Addition 080.33506 37601 98 080 190 - Mid-Tex Gas Division Addition 080.33507 37602 133 080 190 - Mid-Tex Gas Division Addition 080.33513 37602 15 080 190 - Mid-Tex Gas Division Addition 080.33513 38000 1 080 190 - Mid-Tex Gas Division Addition 080.33519 37602 5 080 190 - Mid-Tex Gas Division Addition 080.33519 38000 0 080 190 - Mid-Tex Gas Division Addition 080.33520 37601 252 080 190 - Mid-Tex Gas Division Addition 080.33520 38000 1 080 190 - Mid-Tex Gas Division Addition 080.33546 37602 132 080 190 - Mid-Tex Gas Division Addition 080.33546 38000 247 080 190 - Mid-Tex Gas Division Addition 080.33548 37602 36 080 190 - Mid-Tex Gas Division Addition 080.33548 38000 142 080 190 - Mid-Tex Gas Division Addition 080.33561 37601 2,995 080 190 - Mid-Tex Gas Division Addition 080.33604 37602 277 080 190 - Mid-Tex Gas Division Addition 080.33604 38000 72 080 190 - Mid-Tex Gas Division Addition 080.33654 37602 368 080 190 - Mid-Tex Gas Division Addition 080.33662 37602 16 080 190 - Mid-Tex Gas Division Addition 080.33663 37602 15 080 190 - Mid-Tex Gas Division Addition 080.33676 37602 75 080 190 - Mid-Tex Gas Division Addition 080.33676 38000 31 080 190 - Mid-Tex Gas Division Addition 080.33726 37602 279 080 190 - Mid-Tex Gas Division Addition 080.33726 38000 7 080 190 - Mid-Tex Gas Division Addition 080.33733 37602 62 080 190 - Mid-Tex Gas Division Addition 080.33733 38000 16 080 190 - Mid-Tex Gas Division Addition 080.33734 37602 58 080 190 - Mid-Tex Gas Division Addition 080.33734 38000 21 080 190 - Mid-Tex Gas Division Addition 080.33735 37602 59 080 190 - Mid-Tex Gas Division Addition 080.33735 38000 6 080 190 - Mid-Tex Gas Division Addition 080.33742 37602 807 080 190 - Mid-Tex Gas Division Addition 080.33742 38000 11 080 190 - Mid-Tex Gas Division Addition 080.33746 37602 21 080 190 - Mid-Tex Gas Division Addition 080.33746 38000 1 080 190 - Mid-Tex Gas Division Addition 080.33776 37602 60 080 190 - Mid-Tex Gas Division Addition 080.33798 37601 597 080 190 - Mid-Tex Gas Division Addition 080.33801 37602 21 080 190 - Mid-Tex Gas Division Addition 080.33801 38000 3 080 190 - Mid-Tex Gas Division Addition 080.33840 37602 29 080 190 - Mid-Tex Gas Division Addition 080.33842 37602 377 080 190 - Mid-Tex Gas Division Addition 080.33844 37602 111 080 190 - Mid-Tex Gas Division Addition 080.33844 38000 18 080 190 - Mid-Tex Gas Division Addition 080.33849 37601 311 080 190 - Mid-Tex Gas Division Addition 080.33870 37602 40 080 190 - Mid-Tex Gas Division Addition 080.33900 37602 240 080 190 - Mid-Tex Gas Division Addition 080.33900 38000 52 080 190 - Mid-Tex Gas Division Addition 080.33906 37602 18 080 190 - Mid-Tex Gas Division Addition 080.33907 37602 111 080 190 - Mid-Tex Gas Division Addition 080.33907 38000 106 080 190 - Mid-Tex Gas Division Addition 080.33909 37602 334 080 190 - Mid-Tex Gas Division Addition 080.33909 38000 11 080 190 - Mid-Tex Gas Division Addition 080.33951 37602 102 080 190 - Mid-Tex Gas Division Addition 080.33951 38000 17 080 190 - Mid-Tex Gas Division Addition 080.33979 37602 283 080 190 - Mid-Tex Gas Division Addition 080.33981 37602 32 080 190 - Mid-Tex Gas Division Addition 080.34037 37602 113 080 190 - Mid-Tex Gas Division Addition 080.34048 37602 17 080 190 - Mid-Tex Gas Division Addition 080.34070 37602 85 080 190 - Mid-Tex Gas Division Addition 080.34087 37602 55 080 190 - Mid-Tex Gas Division Addition 080.34087 38000 16 080 190 - Mid-Tex Gas Division Addition 080.34091 37602 281 080 190 - Mid-Tex Gas Division Addition 080.34091 38000 14 080 190 - Mid-Tex Gas Division Addition 080.34136 37602 56 080 190 - Mid-Tex Gas Division Addition 080.34136 38000 11 080 190 - Mid-Tex Gas Division Addition 080.34137 37602 21 080 190 - Mid-Tex Gas Division Addition 080.34143 37602 270 080 190 - Mid-Tex Gas Division Addition 080.34143 38000 110 080 190 - Mid-Tex Gas Division Addition 080.34146 37602 273 080 190 - Mid-Tex Gas Division Addition 080.34175 37602 322 080 190 - Mid-Tex Gas Division Addition 080.34175 38000 10 080 190 - Mid-Tex Gas Division Addition 080.34176 37602 138 080 190 - Mid-Tex Gas Division Addition 080.34176 38000 21 080 190 - Mid-Tex Gas Division Addition 080.34177 37602 259 080 190 - Mid-Tex Gas Division Addition 080.34177 38000 368 080 190 - Mid-Tex Gas Division Addition 080.34187 37602 186 080 190 - Mid-Tex Gas Division Addition 080.34187 38000 100 080 190 - Mid-Tex Gas Division Addition 080.34188 37602 1,359 080 190 - Mid-Tex Gas Division Addition 080.34188 38000 49 080 190 - Mid-Tex Gas Division Addition 080.34208 37602 680 080 190 - Mid-Tex Gas Division Addition 080.34210 37602 216 080 190 - Mid-Tex Gas Division Addition 080.34210 38000 23 080 190 - Mid-Tex Gas Division Addition 080.34228 37602 583 080 190 - Mid-Tex Gas Division Addition 080.34251 37602 66 080 190 - Mid-Tex Gas Division Addition 080.34251 38000 6 080 190 - Mid-Tex Gas Division Addition 080.34286 37602 130 080 190 - Mid-Tex Gas Division Addition 080.34286 38000 22 MTX Additions by FERC Page 1 of 101 399 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.34294 37602 733 080 190 - Mid-Tex Gas Division Addition 080.34294 38000 53 080 190 - Mid-Tex Gas Division Addition 080.34320 37602 33 080 190 - Mid-Tex Gas Division Addition 080.34326 37601 210 080 190 - Mid-Tex Gas Division Addition 080.34395 37602 109 080 190 - Mid-Tex Gas Division Addition 080.34402 37601 205 080 190 - Mid-Tex Gas Division Addition 080.34402 38000 1 080 190 - Mid-Tex Gas Division Addition 080.34403 37601 151 080 190 - Mid-Tex Gas Division Addition 080.34417 37602 240 080 190 - Mid-Tex Gas Division Addition 080.34432 37602 305 080 190 - Mid-Tex Gas Division Addition 080.34470 37602 82 080 190 - Mid-Tex Gas Division Addition 080.34491 37602 96 080 190 - Mid-Tex Gas Division Addition 080.34502 37602 440 080 190 - Mid-Tex Gas Division Addition 080.34502 38000 122 080 190 - Mid-Tex Gas Division Addition 080.34508 37602 65 080 190 - Mid-Tex Gas Division Addition 080.34520 37602 395 080 190 - Mid-Tex Gas Division Addition 080.34520 38000 103 080 190 - Mid-Tex Gas Division Addition 080.34532 37602 20 080 190 - Mid-Tex Gas Division Addition 080.34532 38000 11 080 190 - Mid-Tex Gas Division Addition 080.34543 37602 62 080 190 - Mid-Tex Gas Division Addition 080.34543 38000 12 080 190 - Mid-Tex Gas Division Addition 080.34555 37602 112 080 190 - Mid-Tex Gas Division Addition 080.34555 38000 15 080 190 - Mid-Tex Gas Division Addition 080.34560 37602 617 080 190 - Mid-Tex Gas Division Addition 080.34562 37602 204 080 190 - Mid-Tex Gas Division Addition 080.34579 37602 295 080 190 - Mid-Tex Gas Division Addition 080.34579 38000 65 080 190 - Mid-Tex Gas Division Addition 080.34704 37602 12 080 190 - Mid-Tex Gas Division Addition 080.34729 37602 53 080 190 - Mid-Tex Gas Division Addition 080.34737 37602 672 080 190 - Mid-Tex Gas Division Addition 080.34741 37602 9 080 190 - Mid-Tex Gas Division Addition 080.34741 38000 0 080 190 - Mid-Tex Gas Division Addition 080.34745 37602 79 080 190 - Mid-Tex Gas Division Addition 080.34745 38000 29 080 190 - Mid-Tex Gas Division Addition 080.34747 37602 153 080 190 - Mid-Tex Gas Division Addition 080.34753 37601 112 080 190 - Mid-Tex Gas Division Addition 080.34776 37602 7 080 190 - Mid-Tex Gas Division Addition 080.34785 37602 75 080 190 - Mid-Tex Gas Division Addition 080.34785 38000 6 080 190 - Mid-Tex Gas Division Addition 080.34862 37602 138 080 190 - Mid-Tex Gas Division Addition 080.34866 37602 123 080 190 - Mid-Tex Gas Division Addition 080.34881 37602 307 080 190 - Mid-Tex Gas Division Addition 080.34960 37601 166 080 190 - Mid-Tex Gas Division Addition 080.34982 37602 146 080 190 - Mid-Tex Gas Division Addition 080.34982 38000 39 080 190 - Mid-Tex Gas Division Addition 080.34994 37602 555 080 190 - Mid-Tex Gas Division Addition 080.34994 38000 35 080 190 - Mid-Tex Gas Division Addition 080.34998 37602 134 080 190 - Mid-Tex Gas Division Addition 080.35032 37602 219 080 190 - Mid-Tex Gas Division Addition 080.35156 37602 82 080 190 - Mid-Tex Gas Division Addition 080.35164 37602 37 080 190 - Mid-Tex Gas Division Addition 080.35164 38000 16 080 190 - Mid-Tex Gas Division Addition 080.35180 38000 5 080 190 - Mid-Tex Gas Division Addition 080.35242 37602 4 080 190 - Mid-Tex Gas Division Addition 080.35242 38000 16 080 190 - Mid-Tex Gas Division Addition 080.35255 37602 62 080 190 - Mid-Tex Gas Division Addition 080.38117 37602 0 080 190 - Mid-Tex Gas Division Addition 080.38117 38000 0 080 190 - Mid-Tex Gas Division Addition 080.41066 37601 2,558 080 190 - Mid-Tex Gas Division Addition 080.41157 38000 (312) 080 190 - Mid-Tex Gas Division Addition 080.41874 37601 0 080 190 - Mid-Tex Gas Division Addition 080.41874 37602 0 080 190 - Mid-Tex Gas Division Addition 080.41874 38000 0 080 190 - Mid-Tex Gas Division Addition 080.43732 37602 161 080 190 - Mid-Tex Gas Division Addition 080.43732 38000 9 080 190 - Mid-Tex Gas Division Addition 080.45245 37602 0 080 190 - Mid-Tex Gas Division Addition 080.45245 38000 0 080 190 - Mid-Tex Gas Division Addition 080.45509 37601 (0) 080 190 - Mid-Tex Gas Division Addition 080.45614 37602 0 080 190 - Mid-Tex Gas Division Addition 080.45614 38000 0 080 190 - Mid-Tex Gas Division Addition 080.45638 37601 (46,459) 080 190 - Mid-Tex Gas Division Addition 080.45638 37800 (536) 080 190 - Mid-Tex Gas Division Addition 080.45658 37601 2 080 190 - Mid-Tex Gas Division Addition 080.45700 37602 1 080 190 - Mid-Tex Gas Division Addition 080.45700 38000 1 080 190 - Mid-Tex Gas Division Addition 080.46065 37602 1 080 190 - Mid-Tex Gas Division Addition 080.46065 38000 0 080 190 - Mid-Tex Gas Division Addition 080.46065 38100 0 080 190 - Mid-Tex Gas Division Addition 080.46065 38200 0 080 190 - Mid-Tex Gas Division Addition 080.46065 38300 0 080 190 - Mid-Tex Gas Division Addition 080.46146 37602 4 080 190 - Mid-Tex Gas Division Addition 080.46146 38000 0 080 190 - Mid-Tex Gas Division Addition 080.46146 38100 0 080 190 - Mid-Tex Gas Division Addition 080.46146 38200 0 080 190 - Mid-Tex Gas Division Addition 080.46146 38300 0 080 190 - Mid-Tex Gas Division Addition 080.46447 37601 5,766 080 190 - Mid-Tex Gas Division Addition 080.47046 37602 11,859 080 190 - Mid-Tex Gas Division Addition 080.47046 38000 120 080 190 - Mid-Tex Gas Division Addition 080.47061 37601 0 080 190 - Mid-Tex Gas Division Addition 080.47061 37602 0 080 190 - Mid-Tex Gas Division Addition 080.47079 37602 0 080 190 - Mid-Tex Gas Division Addition 080.47079 38000 0 080 190 - Mid-Tex Gas Division Addition 080.47303 37602 0 080 190 - Mid-Tex Gas Division Addition 080.47303 38000 0 080 190 - Mid-Tex Gas Division Addition 080.47311 37602 78 080 190 - Mid-Tex Gas Division Addition 080.47311 38000 11 080 190 - Mid-Tex Gas Division Addition 080.47311 38100 3 080 190 - Mid-Tex Gas Division Addition 080.47311 38200 4 080 190 - Mid-Tex Gas Division Addition 080.47311 38300 1 080 190 - Mid-Tex Gas Division Addition 080.47445 37602 4 080 190 - Mid-Tex Gas Division Addition 080.47445 38000 3 080 190 - Mid-Tex Gas Division Addition 080.47445 38100 0 080 190 - Mid-Tex Gas Division Addition 080.47445 38200 0 080 190 - Mid-Tex Gas Division Addition 080.47445 38300 0 080 190 - Mid-Tex Gas Division Addition 080.47446 37602 0 080 190 - Mid-Tex Gas Division Addition 080.47600 37602 38 080 190 - Mid-Tex Gas Division Addition 080.47600 38000 16 MTX Additions by FERC Page 2 of 101 400 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.47601 37602 5 080 190 - Mid-Tex Gas Division Addition 080.47601 38000 3 080 190 - Mid-Tex Gas Division Addition 080.47603 37602 40 080 190 - Mid-Tex Gas Division Addition 080.47603 38000 15 080 190 - Mid-Tex Gas Division Addition 080.47605 37602 31 080 190 - Mid-Tex Gas Division Addition 080.47605 38000 12 080 190 - Mid-Tex Gas Division Addition 080.47606 37602 52 080 190 - Mid-Tex Gas Division Addition 080.47606 38000 17 080 190 - Mid-Tex Gas Division Addition 080.47607 38000 293 080 190 - Mid-Tex Gas Division Addition 080.47681 37602 19 080 190 - Mid-Tex Gas Division Addition 080.47681 38000 12 080 190 - Mid-Tex Gas Division Addition 080.47682 37602 37 080 190 - Mid-Tex Gas Division Addition 080.47682 38000 26 080 190 - Mid-Tex Gas Division Addition 080.47848 37602 2 080 190 - Mid-Tex Gas Division Addition 080.47848 38000 0 080 190 - Mid-Tex Gas Division Addition 080.47848 38100 0 080 190 - Mid-Tex Gas Division Addition 080.47848 38200 0 080 190 - Mid-Tex Gas Division Addition 080.47848 38300 0 080 190 - Mid-Tex Gas Division Addition 080.47850 37602 2 080 190 - Mid-Tex Gas Division Addition 080.47850 38000 0 080 190 - Mid-Tex Gas Division Addition 080.47850 38100 0 080 190 - Mid-Tex Gas Division Addition 080.47850 38200 0 080 190 - Mid-Tex Gas Division Addition 080.47850 38300 0 080 190 - Mid-Tex Gas Division Addition 080.47857 37602 3 080 190 - Mid-Tex Gas Division Addition 080.47857 38000 1 080 190 - Mid-Tex Gas Division Addition 080.47857 38100 0 080 190 - Mid-Tex Gas Division Addition 080.47857 38200 0 080 190 - Mid-Tex Gas Division Addition 080.47857 38300 0 080 190 - Mid-Tex Gas Division Addition 080.47894 37600 (67) 080 190 - Mid-Tex Gas Division Addition 080.48010 37602 0 080 190 - Mid-Tex Gas Division Addition 080.48093 37602 360,820 080 190 - Mid-Tex Gas Division Addition 080.48110 37601 1 080 190 - Mid-Tex Gas Division Addition 080.48110 37800 0 080 190 - Mid-Tex Gas Division Addition 080.48519 37602 1 080 190 - Mid-Tex Gas Division Addition 080.48519 38000 0 080 190 - Mid-Tex Gas Division Addition 080.48519 38100 0 080 190 - Mid-Tex Gas Division Addition 080.48519 38200 0 080 190 - Mid-Tex Gas Division Addition 080.48519 38300 0 080 190 - Mid-Tex Gas Division Addition 080.48572 37602 0 080 190 - Mid-Tex Gas Division Addition 080.48572 38000 0 080 190 - Mid-Tex Gas Division Addition 080.48583 37602 0 080 190 - Mid-Tex Gas Division Addition 080.48651 37602 0 080 190 - Mid-Tex Gas Division Addition 080.48651 38000 0 080 190 - Mid-Tex Gas Division Addition 080.48651 38200 0 080 190 - Mid-Tex Gas Division Addition 080.48651 38300 0 080 190 - Mid-Tex Gas Division Addition 080.48677 37602 0 080 190 - Mid-Tex Gas Division Addition 080.48677 38000 0 080 190 - Mid-Tex Gas Division Addition 080.48677 38100 0 080 190 - Mid-Tex Gas Division Addition 080.48741 37602 0 080 190 - Mid-Tex Gas Division Addition 080.48741 38000 0 080 190 - Mid-Tex Gas Division Addition 080.48743 37602 0 080 190 - Mid-Tex Gas Division Addition 080.48782 37602 0 080 190 - Mid-Tex Gas Division Addition 080.48800 37602 67 080 190 - Mid-Tex Gas Division Addition 080.48800 38000 14 080 190 - Mid-Tex Gas Division Addition 080.48800 38100 1 080 190 - Mid-Tex Gas Division Addition 080.48800 38200 1 080 190 - Mid-Tex Gas Division Addition 080.48800 38300 1 080 190 - Mid-Tex Gas Division Addition 080.48844 37602 1 080 190 - Mid-Tex Gas Division Addition 080.48844 38000 0 080 190 - Mid-Tex Gas Division Addition 080.48844 38100 0 080 190 - Mid-Tex Gas Division Addition 080.48847 37602 3 080 190 - Mid-Tex Gas Division Addition 080.48847 38000 2 080 190 - Mid-Tex Gas Division Addition 080.48847 38100 0 080 190 - Mid-Tex Gas Division Addition 080.48847 38200 0 080 190 - Mid-Tex Gas Division Addition 080.48847 38300 0 080 190 - Mid-Tex Gas Division Addition 080.48957 37602 38,092 080 190 - Mid-Tex Gas Division Addition 080.49082 37602 1 080 190 - Mid-Tex Gas Division Addition 080.49082 38000 0 080 190 - Mid-Tex Gas Division Addition 080.49145 37600 10,548 080 190 - Mid-Tex Gas Division Addition 080.49145 37601 861,899 080 190 - Mid-Tex Gas Division Addition 080.49145 37800 168,763 080 190 - Mid-Tex Gas Division Addition 080.49148 37600 47 080 190 - Mid-Tex Gas Division Addition 080.49148 37601 3,862 080 190 - Mid-Tex Gas Division Addition 080.49148 37800 744 080 190 - Mid-Tex Gas Division Addition 080.49174 37602 1 080 190 - Mid-Tex Gas Division Addition 080.49253 37602 - 080 190 - Mid-Tex Gas Division Addition 080.49273 37602 2 080 190 - Mid-Tex Gas Division Addition 080.49273 38000 1 080 190 - Mid-Tex Gas Division Addition 080.49273 38100 0 080 190 - Mid-Tex Gas Division Addition 080.49273 38200 0 080 190 - Mid-Tex Gas Division Addition 080.49273 38300 0 080 190 - Mid-Tex Gas Division Addition 080.49313 37602 1,856 080 190 - Mid-Tex Gas Division Addition 080.49441 37602 1 080 190 - Mid-Tex Gas Division Addition 080.49441 38000 0 080 190 - Mid-Tex Gas Division Addition 080.49441 38100 0 080 190 - Mid-Tex Gas Division Addition 080.49441 38200 0 080 190 - Mid-Tex Gas Division Addition 080.49441 38300 0 080 190 - Mid-Tex Gas Division Addition 080.49469 37602 1 080 190 - Mid-Tex Gas Division Addition 080.49469 38000 0 080 190 - Mid-Tex Gas Division Addition 080.49469 38100 0 080 190 - Mid-Tex Gas Division Addition 080.49469 38200 0 080 190 - Mid-Tex Gas Division Addition 080.49469 38300 0 080 190 - Mid-Tex Gas Division Addition 080.49480 37602 0 080 190 - Mid-Tex Gas Division Addition 080.49480 38000 0 080 190 - Mid-Tex Gas Division Addition 080.49578 37602 0 080 190 - Mid-Tex Gas Division Addition 080.49578 38000 0 080 190 - Mid-Tex Gas Division Addition 080.49578 38100 0 080 190 - Mid-Tex Gas Division Addition 080.49578 38300 0 080 190 - Mid-Tex Gas Division Addition 080.49593 38000 5 080 190 - Mid-Tex Gas Division Addition 080.49593 38100 0 080 190 - Mid-Tex Gas Division Addition 080.49593 38200 0 080 190 - Mid-Tex Gas Division Addition 080.49593 38300 0 080 190 - Mid-Tex Gas Division Addition 080.49658 37602 (9,000) 080 190 - Mid-Tex Gas Division Addition 080.49679 38000 1 080 190 - Mid-Tex Gas Division Addition 080.49679 38100 0 080 190 - Mid-Tex Gas Division Addition 080.49679 38200 0 080 190 - Mid-Tex Gas Division Addition 080.49679 38300 0 MTX Additions by FERC Page 3 of 101 401 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.49765 37602 0 080 190 - Mid-Tex Gas Division Addition 080.49765 38000 0 080 190 - Mid-Tex Gas Division Addition 080.49860 37602 0 080 190 - Mid-Tex Gas Division Addition 080.49910 37602 0 080 190 - Mid-Tex Gas Division Addition 080.49910 38000 0 080 190 - Mid-Tex Gas Division Addition 080.49910 38100 0 080 190 - Mid-Tex Gas Division Addition 080.49910 38200 0 080 190 - Mid-Tex Gas Division Addition 080.49910 38300 0 080 190 - Mid-Tex Gas Division Addition 080.49979 37602 0 080 190 - Mid-Tex Gas Division Addition 080.49984 37602 1 080 190 - Mid-Tex Gas Division Addition 080.49984 38000 0 080 190 - Mid-Tex Gas Division Addition 080.49984 38100 0 080 190 - Mid-Tex Gas Division Addition 080.49984 38200 0 080 190 - Mid-Tex Gas Division Addition 080.49984 38300 0 080 190 - Mid-Tex Gas Division Addition 080.49985 37602 1 080 190 - Mid-Tex Gas Division Addition 080.49985 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50060 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50109 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50115 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50116 37602 2 080 190 - Mid-Tex Gas Division Addition 080.50116 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50116 38100 0 080 190 - Mid-Tex Gas Division Addition 080.50116 38200 0 080 190 - Mid-Tex Gas Division Addition 080.50207 37602 1 080 190 - Mid-Tex Gas Division Addition 080.50207 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50220 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50270 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50270 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50331 37602 1 080 190 - Mid-Tex Gas Division Addition 080.50416 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50416 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50416 38200 0 080 190 - Mid-Tex Gas Division Addition 080.50416 38300 0 080 190 - Mid-Tex Gas Division Addition 080.50420 38000 1 080 190 - Mid-Tex Gas Division Addition 080.50421 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50421 38000 1 080 190 - Mid-Tex Gas Division Addition 080.50421 38100 0 080 190 - Mid-Tex Gas Division Addition 080.50421 38200 0 080 190 - Mid-Tex Gas Division Addition 080.50422 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50422 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50422 38200 0 080 190 - Mid-Tex Gas Division Addition 080.50424 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50424 38000 1 080 190 - Mid-Tex Gas Division Addition 080.50424 38100 0 080 190 - Mid-Tex Gas Division Addition 080.50424 38200 0 080 190 - Mid-Tex Gas Division Addition 080.50424 38300 0 080 190 - Mid-Tex Gas Division Addition 080.50425 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50425 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50454 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50454 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50497 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50504 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50504 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50504 38100 0 080 190 - Mid-Tex Gas Division Addition 080.50504 38200 0 080 190 - Mid-Tex Gas Division Addition 080.50504 38300 0 080 190 - Mid-Tex Gas Division Addition 080.50529 38000 2 080 190 - Mid-Tex Gas Division Addition 080.50529 38100 0 080 190 - Mid-Tex Gas Division Addition 080.50529 38200 0 080 190 - Mid-Tex Gas Division Addition 080.50635 38000 1 080 190 - Mid-Tex Gas Division Addition 080.50635 38100 0 080 190 - Mid-Tex Gas Division Addition 080.50635 38200 0 080 190 - Mid-Tex Gas Division Addition 080.50635 38300 0 080 190 - Mid-Tex Gas Division Addition 080.50659 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50659 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50659 38100 0 080 190 - Mid-Tex Gas Division Addition 080.50659 38200 0 080 190 - Mid-Tex Gas Division Addition 080.50659 38300 0 080 190 - Mid-Tex Gas Division Addition 080.50662 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50662 38100 0 080 190 - Mid-Tex Gas Division Addition 080.50662 38300 0 080 190 - Mid-Tex Gas Division Addition 080.50668 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50681 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50681 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50681 38200 0 080 190 - Mid-Tex Gas Division Addition 080.50717 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50727 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50727 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50745 37602 1 080 190 - Mid-Tex Gas Division Addition 080.50745 38000 2 080 190 - Mid-Tex Gas Division Addition 080.50745 38100 0 080 190 - Mid-Tex Gas Division Addition 080.50745 38200 0 080 190 - Mid-Tex Gas Division Addition 080.50745 38300 0 080 190 - Mid-Tex Gas Division Addition 080.50753 37602 2 080 190 - Mid-Tex Gas Division Addition 080.50753 38000 1 080 190 - Mid-Tex Gas Division Addition 080.50796 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50796 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50796 38100 0 080 190 - Mid-Tex Gas Division Addition 080.50819 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50830 38000 1 080 190 - Mid-Tex Gas Division Addition 080.50830 38100 0 080 190 - Mid-Tex Gas Division Addition 080.50830 38200 0 080 190 - Mid-Tex Gas Division Addition 080.50830 38300 0 080 190 - Mid-Tex Gas Division Addition 080.50838 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50838 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50838 38200 0 080 190 - Mid-Tex Gas Division Addition 080.50847 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50847 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50867 37602 3 080 190 - Mid-Tex Gas Division Addition 080.50867 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50867 38100 0 080 190 - Mid-Tex Gas Division Addition 080.50903 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50939 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50939 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50939 38100 0 080 190 - Mid-Tex Gas Division Addition 080.50939 38200 0 080 190 - Mid-Tex Gas Division Addition 080.50939 38300 0 MTX Additions by FERC Page 4 of 101 402 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.50975 37602 1 080 190 - Mid-Tex Gas Division Addition 080.50975 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50975 38100 0 080 190 - Mid-Tex Gas Division Addition 080.50975 38200 0 080 190 - Mid-Tex Gas Division Addition 080.50975 38300 0 080 190 - Mid-Tex Gas Division Addition 080.50986 37602 0 080 190 - Mid-Tex Gas Division Addition 080.50986 38000 0 080 190 - Mid-Tex Gas Division Addition 080.50986 38200 0 080 190 - Mid-Tex Gas Division Addition 080.50986 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51003 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51003 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51004 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51004 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51004 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51005 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51005 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51025 37602 9,124 080 190 - Mid-Tex Gas Division Addition 080.51030 37602 1 080 190 - Mid-Tex Gas Division Addition 080.51030 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51030 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51033 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51033 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51034 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51034 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51034 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51041 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51041 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51053 37602 3 080 190 - Mid-Tex Gas Division Addition 080.51053 38000 1 080 190 - Mid-Tex Gas Division Addition 080.51053 38100 1 080 190 - Mid-Tex Gas Division Addition 080.51053 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51053 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51054 37602 2 080 190 - Mid-Tex Gas Division Addition 080.51054 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51054 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51054 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51054 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51093 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51093 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51093 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51093 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51094 38000 1 080 190 - Mid-Tex Gas Division Addition 080.51094 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51094 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51094 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51119 38000 (3) 080 190 - Mid-Tex Gas Division Addition 080.51119 38100 (0) 080 190 - Mid-Tex Gas Division Addition 080.51119 38200 (1) 080 190 - Mid-Tex Gas Division Addition 080.51119 38300 (0) 080 190 - Mid-Tex Gas Division Addition 080.51131 38100 (0) 080 190 - Mid-Tex Gas Division Addition 080.51131 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51131 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51132 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51133 38100 (0) 080 190 - Mid-Tex Gas Division Addition 080.51133 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51133 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51134 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51134 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51135 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51135 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51136 38100 (0) 080 190 - Mid-Tex Gas Division Addition 080.51136 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51136 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51137 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51137 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51138 38100 (0) 080 190 - Mid-Tex Gas Division Addition 080.51138 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51138 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51142 37602 501 080 190 - Mid-Tex Gas Division Addition 080.51142 38000 5 080 190 - Mid-Tex Gas Division Addition 080.51158 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51159 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51162 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51162 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51162 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51162 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51171 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51171 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51176 37602 2 080 190 - Mid-Tex Gas Division Addition 080.51176 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51220 37601 27,799 080 190 - Mid-Tex Gas Division Addition 080.51220 37800 3,194 080 190 - Mid-Tex Gas Division Addition 080.51221 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51221 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51235 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.51235 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.51244 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51250 37602 1 080 190 - Mid-Tex Gas Division Addition 080.51250 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51250 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51250 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51250 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51255 37602 1 080 190 - Mid-Tex Gas Division Addition 080.51255 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51263 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51263 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51313 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51313 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51313 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51313 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51313 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51317 37602 1 080 190 - Mid-Tex Gas Division Addition 080.51317 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51317 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51317 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51318 37602 1 080 190 - Mid-Tex Gas Division Addition 080.51318 38000 0 MTX Additions by FERC Page 5 of 101 403 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.51318 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51332 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51332 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51332 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51371 37602 4 080 190 - Mid-Tex Gas Division Addition 080.51371 38000 1 080 190 - Mid-Tex Gas Division Addition 080.51376 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51376 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51391 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51391 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51395 37602 1 080 190 - Mid-Tex Gas Division Addition 080.51396 37602 1 080 190 - Mid-Tex Gas Division Addition 080.51396 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51405 37602 1 080 190 - Mid-Tex Gas Division Addition 080.51405 38000 1 080 190 - Mid-Tex Gas Division Addition 080.51405 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51405 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51405 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51420 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51420 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51420 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51420 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51420 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51421 37602 1 080 190 - Mid-Tex Gas Division Addition 080.51421 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51421 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51421 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51421 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51434 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.51434 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.51451 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51459 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51471 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51471 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51471 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51471 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51471 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51473 37602 1 080 190 - Mid-Tex Gas Division Addition 080.51473 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51473 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51473 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51473 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51474 37602 1 080 190 - Mid-Tex Gas Division Addition 080.51474 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51474 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51474 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51474 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51513 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51513 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51529 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51530 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51530 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51530 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51543 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.51617 37602 1 080 190 - Mid-Tex Gas Division Addition 080.51617 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51617 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51620 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51620 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51620 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51648 37602 (900) 080 190 - Mid-Tex Gas Division Addition 080.51648 38000 (106) 080 190 - Mid-Tex Gas Division Addition 080.51648 38100 (32) 080 190 - Mid-Tex Gas Division Addition 080.51648 38200 (11) 080 190 - Mid-Tex Gas Division Addition 080.51648 38300 (11) 080 190 - Mid-Tex Gas Division Addition 080.51653 37602 2 080 190 - Mid-Tex Gas Division Addition 080.51653 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51653 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51653 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51655 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51655 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51676 37602 (1) 080 190 - Mid-Tex Gas Division Addition 080.51676 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.51676 38100 (0) 080 190 - Mid-Tex Gas Division Addition 080.51702 37602 2 080 190 - Mid-Tex Gas Division Addition 080.51702 38000 1 080 190 - Mid-Tex Gas Division Addition 080.51743 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51743 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51783 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51801 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51801 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51801 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51804 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51806 37602 3 080 190 - Mid-Tex Gas Division Addition 080.51806 38000 2 080 190 - Mid-Tex Gas Division Addition 080.51806 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51806 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51806 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51829 37602 0 080 190 - Mid-Tex Gas Division Addition 080.51840 37602 1 080 190 - Mid-Tex Gas Division Addition 080.51840 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51840 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51840 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51840 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51843 37602 19 080 190 - Mid-Tex Gas Division Addition 080.51843 38000 2 080 190 - Mid-Tex Gas Division Addition 080.51846 37602 1 080 190 - Mid-Tex Gas Division Addition 080.51846 38000 0 080 190 - Mid-Tex Gas Division Addition 080.51846 38100 0 080 190 - Mid-Tex Gas Division Addition 080.51846 38200 0 080 190 - Mid-Tex Gas Division Addition 080.51846 38300 0 080 190 - Mid-Tex Gas Division Addition 080.51886 37602 1 080 190 - Mid-Tex Gas Division Addition 080.51889 37602 3 080 190 - Mid-Tex Gas Division Addition 080.51920 37602 23,907 080 190 - Mid-Tex Gas Division Addition 080.51994 37602 0 080 190 - Mid-Tex Gas Division Addition 080.52029 37602 1 080 190 - Mid-Tex Gas Division Addition 080.52036 37602 39 MTX Additions by FERC Page 6 of 101 404 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.52039 37602 0 080 190 - Mid-Tex Gas Division Addition 080.52039 38000 0 080 190 - Mid-Tex Gas Division Addition 080.52052 38000 3 080 190 - Mid-Tex Gas Division Addition 080.52052 38200 0 080 190 - Mid-Tex Gas Division Addition 080.52052 38300 0 080 190 - Mid-Tex Gas Division Addition 080.52053 38000 1 080 190 - Mid-Tex Gas Division Addition 080.52055 38000 3 080 190 - Mid-Tex Gas Division Addition 080.52056 38000 1 080 190 - Mid-Tex Gas Division Addition 080.52056 38200 0 080 190 - Mid-Tex Gas Division Addition 080.52108 37602 1,554,872 080 190 - Mid-Tex Gas Division Addition 080.52108 38000 31,732 080 190 - Mid-Tex Gas Division Addition 080.52232 38000 0 080 190 - Mid-Tex Gas Division Addition 080.52232 38100 0 080 190 - Mid-Tex Gas Division Addition 080.52232 38200 0 080 190 - Mid-Tex Gas Division Addition 080.52232 38300 0 080 190 - Mid-Tex Gas Division Addition 080.52245 37602 0 080 190 - Mid-Tex Gas Division Addition 080.52260 37602 0 080 190 - Mid-Tex Gas Division Addition 080.52287 37602 1 080 190 - Mid-Tex Gas Division Addition 080.52287 38000 0 080 190 - Mid-Tex Gas Division Addition 080.52287 38100 0 080 190 - Mid-Tex Gas Division Addition 080.52287 38200 0 080 190 - Mid-Tex Gas Division Addition 080.52287 38300 0 080 190 - Mid-Tex Gas Division Addition 080.52327 37602 1 080 190 - Mid-Tex Gas Division Addition 080.52327 38100 0 080 190 - Mid-Tex Gas Division Addition 080.52327 38200 0 080 190 - Mid-Tex Gas Division Addition 080.52327 38300 0 080 190 - Mid-Tex Gas Division Addition 080.52338 37602 0 080 190 - Mid-Tex Gas Division Addition 080.52367 37602 1 080 190 - Mid-Tex Gas Division Addition 080.52367 38000 0 080 190 - Mid-Tex Gas Division Addition 080.52367 38100 0 080 190 - Mid-Tex Gas Division Addition 080.52367 38200 0 080 190 - Mid-Tex Gas Division Addition 080.52367 38300 0 080 190 - Mid-Tex Gas Division Addition 080.52398 37602 0 080 190 - Mid-Tex Gas Division Addition 080.52398 38000 0 080 190 - Mid-Tex Gas Division Addition 080.52412 37602 0 080 190 - Mid-Tex Gas Division Addition 080.52442 37601 0 080 190 - Mid-Tex Gas Division Addition 080.52442 37800 0 080 190 - Mid-Tex Gas Division Addition 080.52463 37602 27 080 190 - Mid-Tex Gas Division Addition 080.52463 38000 11 080 190 - Mid-Tex Gas Division Addition 080.52476 37602 0 080 190 - Mid-Tex Gas Division Addition 080.52476 38000 0 080 190 - Mid-Tex Gas Division Addition 080.52476 38100 0 080 190 - Mid-Tex Gas Division Addition 080.52476 38200 0 080 190 - Mid-Tex Gas Division Addition 080.52476 38300 0 080 190 - Mid-Tex Gas Division Addition 080.52537 37602 0 080 190 - Mid-Tex Gas Division Addition 080.52537 38000 0 080 190 - Mid-Tex Gas Division Addition 080.52538 37602 0 080 190 - Mid-Tex Gas Division Addition 080.52538 38000 0 080 190 - Mid-Tex Gas Division Addition 080.52539 37602 0 080 190 - Mid-Tex Gas Division Addition 080.52540 37602 0 080 190 - Mid-Tex Gas Division Addition 080.52540 38000 0 080 190 - Mid-Tex Gas Division Addition 080.52540 38100 0 080 190 - Mid-Tex Gas Division Addition 080.52540 38200 0 080 190 - Mid-Tex Gas Division Addition 080.52540 38300 0 080 190 - Mid-Tex Gas Division Addition 080.52594 38000 0 080 190 - Mid-Tex Gas Division Addition 080.52594 38100 0 080 190 - Mid-Tex Gas Division Addition 080.52594 38200 0 080 190 - Mid-Tex Gas Division Addition 080.52594 38300 0 080 190 - Mid-Tex Gas Division Addition 080.52775 38000 0 080 190 - Mid-Tex Gas Division Addition 080.52803 37602 0 080 190 - Mid-Tex Gas Division Addition 080.52821 38000 0 080 190 - Mid-Tex Gas Division Addition 080.52904 37602 1 080 190 - Mid-Tex Gas Division Addition 080.52904 38000 0 080 190 - Mid-Tex Gas Division Addition 080.52904 38100 0 080 190 - Mid-Tex Gas Division Addition 080.52904 38200 0 080 190 - Mid-Tex Gas Division Addition 080.52904 38300 0 080 190 - Mid-Tex Gas Division Addition 080.52906 37601 (278) 080 190 - Mid-Tex Gas Division Addition 080.52906 37602 (4) 080 190 - Mid-Tex Gas Division Addition 080.52906 37800 (115) 080 190 - Mid-Tex Gas Division Addition 080.52909 37602 1 080 190 - Mid-Tex Gas Division Addition 080.52909 38000 0 080 190 - Mid-Tex Gas Division Addition 080.52909 38100 0 080 190 - Mid-Tex Gas Division Addition 080.52909 38200 0 080 190 - Mid-Tex Gas Division Addition 080.52909 38300 0 080 190 - Mid-Tex Gas Division Addition 080.52910 37602 0 080 190 - Mid-Tex Gas Division Addition 080.52913 37602 0 080 190 - Mid-Tex Gas Division Addition 080.52914 37602 0 080 190 - Mid-Tex Gas Division Addition 080.52917 37602 256 080 190 - Mid-Tex Gas Division Addition 080.52917 38000 64 080 190 - Mid-Tex Gas Division Addition 080.53005 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53005 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53046 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53048 37602 1 080 190 - Mid-Tex Gas Division Addition 080.53048 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53048 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53048 38200 0 080 190 - Mid-Tex Gas Division Addition 080.53048 38300 0 080 190 - Mid-Tex Gas Division Addition 080.53189 37602 2 080 190 - Mid-Tex Gas Division Addition 080.53189 38000 1 080 190 - Mid-Tex Gas Division Addition 080.53189 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53189 38200 0 080 190 - Mid-Tex Gas Division Addition 080.53189 38300 2 080 190 - Mid-Tex Gas Division Addition 080.53195 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53195 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53195 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53195 38200 0 080 190 - Mid-Tex Gas Division Addition 080.53195 38300 0 080 190 - Mid-Tex Gas Division Addition 080.53204 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53221 37602 259 080 190 - Mid-Tex Gas Division Addition 080.53221 38000 19 080 190 - Mid-Tex Gas Division Addition 080.53238 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53238 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53242 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53242 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53254 37602 2 080 190 - Mid-Tex Gas Division Addition 080.53254 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53254 38200 0 MTX Additions by FERC Page 7 of 101 405 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.53254 38300 0 080 190 - Mid-Tex Gas Division Addition 080.53277 37602 2 080 190 - Mid-Tex Gas Division Addition 080.53277 38000 1 080 190 - Mid-Tex Gas Division Addition 080.53277 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53277 38200 0 080 190 - Mid-Tex Gas Division Addition 080.53277 38300 0 080 190 - Mid-Tex Gas Division Addition 080.53302 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53302 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53302 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53302 38200 0 080 190 - Mid-Tex Gas Division Addition 080.53302 38300 0 080 190 - Mid-Tex Gas Division Addition 080.53322 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53322 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53384 37602 183 080 190 - Mid-Tex Gas Division Addition 080.53385 37600 32 080 190 - Mid-Tex Gas Division Addition 080.53392 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53451 37602 1 080 190 - Mid-Tex Gas Division Addition 080.53451 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53479 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53535 37602 1 080 190 - Mid-Tex Gas Division Addition 080.53535 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53535 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53535 38300 0 080 190 - Mid-Tex Gas Division Addition 080.53555 37602 1 080 190 - Mid-Tex Gas Division Addition 080.53555 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53555 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53555 38200 0 080 190 - Mid-Tex Gas Division Addition 080.53555 38300 0 080 190 - Mid-Tex Gas Division Addition 080.53561 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53561 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53591 37602 44 080 190 - Mid-Tex Gas Division Addition 080.53612 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53613 37602 515 080 190 - Mid-Tex Gas Division Addition 080.53614 37602 1 080 190 - Mid-Tex Gas Division Addition 080.53614 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53623 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53623 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53623 38200 0 080 190 - Mid-Tex Gas Division Addition 080.53623 38300 0 080 190 - Mid-Tex Gas Division Addition 080.53624 37602 1 080 190 - Mid-Tex Gas Division Addition 080.53624 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53624 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53624 38200 0 080 190 - Mid-Tex Gas Division Addition 080.53624 38300 0 080 190 - Mid-Tex Gas Division Addition 080.53627 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53654 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53654 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53654 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53668 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53671 37602 1 080 190 - Mid-Tex Gas Division Addition 080.53671 38000 1 080 190 - Mid-Tex Gas Division Addition 080.53671 38100 1 080 190 - Mid-Tex Gas Division Addition 080.53671 38200 0 080 190 - Mid-Tex Gas Division Addition 080.53671 38300 0 080 190 - Mid-Tex Gas Division Addition 080.53675 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53675 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53677 37601 0 080 190 - Mid-Tex Gas Division Addition 080.53677 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53678 38000 1 080 190 - Mid-Tex Gas Division Addition 080.53678 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53678 38200 0 080 190 - Mid-Tex Gas Division Addition 080.53678 38300 0 080 190 - Mid-Tex Gas Division Addition 080.53684 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53696 37602 1 080 190 - Mid-Tex Gas Division Addition 080.53696 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53696 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53696 38200 0 080 190 - Mid-Tex Gas Division Addition 080.53696 38300 0 080 190 - Mid-Tex Gas Division Addition 080.53697 37602 2 080 190 - Mid-Tex Gas Division Addition 080.53697 38000 1 080 190 - Mid-Tex Gas Division Addition 080.53697 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53697 38200 0 080 190 - Mid-Tex Gas Division Addition 080.53697 38300 0 080 190 - Mid-Tex Gas Division Addition 080.53699 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53699 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53700 37602 1 080 190 - Mid-Tex Gas Division Addition 080.53700 38000 1 080 190 - Mid-Tex Gas Division Addition 080.53700 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53700 38200 0 080 190 - Mid-Tex Gas Division Addition 080.53711 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53711 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53712 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53712 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53712 38200 0 080 190 - Mid-Tex Gas Division Addition 080.53712 38300 0 080 190 - Mid-Tex Gas Division Addition 080.53713 37602 1 080 190 - Mid-Tex Gas Division Addition 080.53713 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53713 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53713 38200 0 080 190 - Mid-Tex Gas Division Addition 080.53713 38300 0 080 190 - Mid-Tex Gas Division Addition 080.53731 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53778 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53779 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53779 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53785 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53800 37602 412 080 190 - Mid-Tex Gas Division Addition 080.53809 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53810 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53810 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53811 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53811 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53811 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53813 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53813 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53824 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.53824 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.53829 37602 0 MTX Additions by FERC Page 8 of 101 406 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.53829 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53829 38100 0 080 190 - Mid-Tex Gas Division Addition 080.53831 37602 3 080 190 - Mid-Tex Gas Division Addition 080.53831 37800 0 080 190 - Mid-Tex Gas Division Addition 080.53831 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53874 37602 0 080 190 - Mid-Tex Gas Division Addition 080.53874 38000 0 080 190 - Mid-Tex Gas Division Addition 080.53892 37602 5,876 080 190 - Mid-Tex Gas Division Addition 080.53893 37602 5,876 080 190 - Mid-Tex Gas Division Addition 080.53894 37602 2,474 080 190 - Mid-Tex Gas Division Addition 080.53909 37601 4 080 190 - Mid-Tex Gas Division Addition 080.53959 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54000 37602 1 080 190 - Mid-Tex Gas Division Addition 080.54000 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54002 37602 1 080 190 - Mid-Tex Gas Division Addition 080.54002 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54002 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54002 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54021 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54021 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54037 37602 1,418 080 190 - Mid-Tex Gas Division Addition 080.54043 37602 3 080 190 - Mid-Tex Gas Division Addition 080.54043 38000 2 080 190 - Mid-Tex Gas Division Addition 080.54043 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54043 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54043 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54046 37602 63 080 190 - Mid-Tex Gas Division Addition 080.54046 38000 12 080 190 - Mid-Tex Gas Division Addition 080.54052 38000 1 080 190 - Mid-Tex Gas Division Addition 080.54052 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54052 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54086 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54086 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54090 37602 2 080 190 - Mid-Tex Gas Division Addition 080.54090 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54097 37602 2 080 190 - Mid-Tex Gas Division Addition 080.54112 37602 16 080 190 - Mid-Tex Gas Division Addition 080.54141 37602 83 080 190 - Mid-Tex Gas Division Addition 080.54141 38000 36 080 190 - Mid-Tex Gas Division Addition 080.54155 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54160 37601 4 080 190 - Mid-Tex Gas Division Addition 080.54160 37602 2 080 190 - Mid-Tex Gas Division Addition 080.54166 37602 4 080 190 - Mid-Tex Gas Division Addition 080.54166 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54195 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54195 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54211 37602 2 080 190 - Mid-Tex Gas Division Addition 080.54211 38000 1 080 190 - Mid-Tex Gas Division Addition 080.54211 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54211 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54211 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54213 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54217 37602 1 080 190 - Mid-Tex Gas Division Addition 080.54217 38000 1 080 190 - Mid-Tex Gas Division Addition 080.54217 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54217 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54217 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54253 37602 2 080 190 - Mid-Tex Gas Division Addition 080.54264 37602 16 080 190 - Mid-Tex Gas Division Addition 080.54264 38000 1 080 190 - Mid-Tex Gas Division Addition 080.54270 37602 14 080 190 - Mid-Tex Gas Division Addition 080.54270 38000 8 080 190 - Mid-Tex Gas Division Addition 080.54273 37602 1 080 190 - Mid-Tex Gas Division Addition 080.54273 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54277 37602 1,295 080 190 - Mid-Tex Gas Division Addition 080.54277 37800 3,022 080 190 - Mid-Tex Gas Division Addition 080.54287 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54287 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54287 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54287 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54287 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54291 37602 5 080 190 - Mid-Tex Gas Division Addition 080.54318 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54320 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54341 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54341 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54341 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54341 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54341 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54356 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54356 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54357 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54357 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54357 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54357 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54359 38000 2 080 190 - Mid-Tex Gas Division Addition 080.54359 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54359 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54359 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54360 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54360 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54360 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54360 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54366 37602 1 080 190 - Mid-Tex Gas Division Addition 080.54366 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54366 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54366 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54366 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54370 38000 2 080 190 - Mid-Tex Gas Division Addition 080.54370 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54370 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54370 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54427 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.54427 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.54427 38100 (0) 080 190 - Mid-Tex Gas Division Addition 080.54428 37602 6 080 190 - Mid-Tex Gas Division Addition 080.54428 38000 3 MTX Additions by FERC Page 9 of 101 407 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.54428 38100 1 080 190 - Mid-Tex Gas Division Addition 080.54428 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54428 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54431 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54431 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54431 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54446 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54446 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54447 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54468 37602 2 080 190 - Mid-Tex Gas Division Addition 080.54468 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54468 38100 2 080 190 - Mid-Tex Gas Division Addition 080.54468 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54468 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54472 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54472 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54486 37602 928 080 190 - Mid-Tex Gas Division Addition 080.54551 37602 2 080 190 - Mid-Tex Gas Division Addition 080.54570 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54570 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54570 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54590 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54590 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54590 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54590 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54590 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54610 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54610 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54611 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54624 37602 1 080 190 - Mid-Tex Gas Division Addition 080.54624 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54624 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54624 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54624 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54625 37602 2 080 190 - Mid-Tex Gas Division Addition 080.54625 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54625 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54625 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54661 37600 2,371 080 190 - Mid-Tex Gas Division Addition 080.54661 37601 99,214 080 190 - Mid-Tex Gas Division Addition 080.54661 37602 241 080 190 - Mid-Tex Gas Division Addition 080.54661 37800 16,438 080 190 - Mid-Tex Gas Division Addition 080.54681 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54685 37602 61 080 190 - Mid-Tex Gas Division Addition 080.54704 37602 2 080 190 - Mid-Tex Gas Division Addition 080.54704 38000 1 080 190 - Mid-Tex Gas Division Addition 080.54704 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54704 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54704 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54706 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54706 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54706 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54706 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54706 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54707 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54707 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54710 38000 1 080 190 - Mid-Tex Gas Division Addition 080.54710 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54710 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54711 37602 1 080 190 - Mid-Tex Gas Division Addition 080.54711 38000 1 080 190 - Mid-Tex Gas Division Addition 080.54711 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54711 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54711 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54717 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54717 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54733 37601 102 080 190 - Mid-Tex Gas Division Addition 080.54733 37602 1 080 190 - Mid-Tex Gas Division Addition 080.54733 37800 17 080 190 - Mid-Tex Gas Division Addition 080.54794 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54794 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54794 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54794 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54794 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54797 37602 2 080 190 - Mid-Tex Gas Division Addition 080.54797 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54797 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54797 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54797 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54842 38000 1 080 190 - Mid-Tex Gas Division Addition 080.54842 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54842 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54842 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54854 37602 1 080 190 - Mid-Tex Gas Division Addition 080.54854 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54854 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54854 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54854 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54858 37602 18 080 190 - Mid-Tex Gas Division Addition 080.54858 38000 1 080 190 - Mid-Tex Gas Division Addition 080.54858 38100 3 080 190 - Mid-Tex Gas Division Addition 080.54858 38200 3 080 190 - Mid-Tex Gas Division Addition 080.54858 38300 3 080 190 - Mid-Tex Gas Division Addition 080.54859 37602 1 080 190 - Mid-Tex Gas Division Addition 080.54863 37602 3 080 190 - Mid-Tex Gas Division Addition 080.54863 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54875 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54875 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54894 37602 79 080 190 - Mid-Tex Gas Division Addition 080.54895 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54926 37602 0 080 190 - Mid-Tex Gas Division Addition 080.54934 37602 6 080 190 - Mid-Tex Gas Division Addition 080.54934 38000 1 080 190 - Mid-Tex Gas Division Addition 080.54934 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54934 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54934 38300 0 080 190 - Mid-Tex Gas Division Addition 080.54965 37602 0 MTX Additions by FERC Page 10 of 101 408 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.54988 38000 0 080 190 - Mid-Tex Gas Division Addition 080.54988 38100 0 080 190 - Mid-Tex Gas Division Addition 080.54988 38200 0 080 190 - Mid-Tex Gas Division Addition 080.54988 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55018 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55026 37602 1 080 190 - Mid-Tex Gas Division Addition 080.55026 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55026 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55026 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55026 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55033 37602 1 080 190 - Mid-Tex Gas Division Addition 080.55033 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55033 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55033 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55041 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55041 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55045 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55054 37602 2 080 190 - Mid-Tex Gas Division Addition 080.55054 38000 1 080 190 - Mid-Tex Gas Division Addition 080.55054 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55054 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55054 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55055 37602 1 080 190 - Mid-Tex Gas Division Addition 080.55055 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55055 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55055 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55055 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55059 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55059 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55060 37602 61 080 190 - Mid-Tex Gas Division Addition 080.55060 38000 21 080 190 - Mid-Tex Gas Division Addition 080.55064 37602 1 080 190 - Mid-Tex Gas Division Addition 080.55064 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55064 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55065 37601 1,746 080 190 - Mid-Tex Gas Division Addition 080.55065 37602 217 080 190 - Mid-Tex Gas Division Addition 080.55065 37800 173 080 190 - Mid-Tex Gas Division Addition 080.55065 38000 22 080 190 - Mid-Tex Gas Division Addition 080.55070 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55070 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55083 37602 1 080 190 - Mid-Tex Gas Division Addition 080.55083 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55083 38100 1 080 190 - Mid-Tex Gas Division Addition 080.55083 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55083 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55091 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.55097 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55147 37602 1,456 080 190 - Mid-Tex Gas Division Addition 080.55170 37602 61 080 190 - Mid-Tex Gas Division Addition 080.55172 37602 3 080 190 - Mid-Tex Gas Division Addition 080.55172 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55172 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55172 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55178 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.55178 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.55178 38100 (0) 080 190 - Mid-Tex Gas Division Addition 080.55178 38200 (0) 080 190 - Mid-Tex Gas Division Addition 080.55178 38300 (0) 080 190 - Mid-Tex Gas Division Addition 080.55180 37602 1 080 190 - Mid-Tex Gas Division Addition 080.55180 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55192 37602 1 080 190 - Mid-Tex Gas Division Addition 080.55192 38000 1 080 190 - Mid-Tex Gas Division Addition 080.55192 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55192 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55192 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55195 37602 3 080 190 - Mid-Tex Gas Division Addition 080.55195 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55195 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55195 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55196 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55204 37602 35 080 190 - Mid-Tex Gas Division Addition 080.55204 38000 12 080 190 - Mid-Tex Gas Division Addition 080.55205 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55210 37602 6 080 190 - Mid-Tex Gas Division Addition 080.55210 38000 1 080 190 - Mid-Tex Gas Division Addition 080.55221 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55221 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55232 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55232 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55232 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55232 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55234 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55241 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55241 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55241 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55251 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.55257 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55260 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55260 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55279 37602 49 080 190 - Mid-Tex Gas Division Addition 080.55279 38000 13 080 190 - Mid-Tex Gas Division Addition 080.55279 38100 18 080 190 - Mid-Tex Gas Division Addition 080.55279 38200 4 080 190 - Mid-Tex Gas Division Addition 080.55279 38300 4 080 190 - Mid-Tex Gas Division Addition 080.55280 37602 51 080 190 - Mid-Tex Gas Division Addition 080.55280 38000 56 080 190 - Mid-Tex Gas Division Addition 080.55280 38100 4 080 190 - Mid-Tex Gas Division Addition 080.55280 38200 1 080 190 - Mid-Tex Gas Division Addition 080.55304 37602 78 080 190 - Mid-Tex Gas Division Addition 080.55304 38000 8 080 190 - Mid-Tex Gas Division Addition 080.55320 37602 100 080 190 - Mid-Tex Gas Division Addition 080.55320 38000 16 080 190 - Mid-Tex Gas Division Addition 080.55322 37602 73 080 190 - Mid-Tex Gas Division Addition 080.55322 38000 31 080 190 - Mid-Tex Gas Division Addition 080.55337 37601 39 080 190 - Mid-Tex Gas Division Addition 080.55337 37602 1 080 190 - Mid-Tex Gas Division Addition 080.55337 37800 3 MTX Additions by FERC Page 11 of 101 409 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.55351 37602 102 080 190 - Mid-Tex Gas Division Addition 080.55351 38000 3 080 190 - Mid-Tex Gas Division Addition 080.55379 37602 45 080 190 - Mid-Tex Gas Division Addition 080.55379 38000 26 080 190 - Mid-Tex Gas Division Addition 080.55379 38100 10 080 190 - Mid-Tex Gas Division Addition 080.55379 38200 8 080 190 - Mid-Tex Gas Division Addition 080.55379 38300 10 080 190 - Mid-Tex Gas Division Addition 080.55380 37602 (629) 080 190 - Mid-Tex Gas Division Addition 080.55380 38000 (210) 080 190 - Mid-Tex Gas Division Addition 080.55380 38100 (105) 080 190 - Mid-Tex Gas Division Addition 080.55380 38200 (52) 080 190 - Mid-Tex Gas Division Addition 080.55380 38300 (52) 080 190 - Mid-Tex Gas Division Addition 080.55397 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.55405 37601 399 080 190 - Mid-Tex Gas Division Addition 080.55405 37800 40 080 190 - Mid-Tex Gas Division Addition 080.55419 37602 3 080 190 - Mid-Tex Gas Division Addition 080.55419 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55419 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55419 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55419 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55422 37602 1 080 190 - Mid-Tex Gas Division Addition 080.55422 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55422 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55422 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55423 37602 1 080 190 - Mid-Tex Gas Division Addition 080.55423 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55424 37602 2 080 190 - Mid-Tex Gas Division Addition 080.55424 38000 1 080 190 - Mid-Tex Gas Division Addition 080.55424 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55424 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55425 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55425 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55485 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55487 37602 1 080 190 - Mid-Tex Gas Division Addition 080.55487 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55487 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55487 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55487 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55488 37602 4 080 190 - Mid-Tex Gas Division Addition 080.55488 38000 1 080 190 - Mid-Tex Gas Division Addition 080.55488 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55488 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55488 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55495 37602 53 080 190 - Mid-Tex Gas Division Addition 080.55513 38000 3 080 190 - Mid-Tex Gas Division Addition 080.55513 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55513 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55513 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55520 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55520 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55565 37602 1 080 190 - Mid-Tex Gas Division Addition 080.55565 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55565 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55565 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55565 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55568 37602 2 080 190 - Mid-Tex Gas Division Addition 080.55568 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55568 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55568 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55568 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55642 37602 106 080 190 - Mid-Tex Gas Division Addition 080.55642 38000 25 080 190 - Mid-Tex Gas Division Addition 080.55642 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55642 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55667 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55667 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55674 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55674 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55674 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55674 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55674 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55682 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.55682 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.55683 37602 13 080 190 - Mid-Tex Gas Division Addition 080.55683 38000 9 080 190 - Mid-Tex Gas Division Addition 080.55697 37602 2 080 190 - Mid-Tex Gas Division Addition 080.55697 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55710 37602 1 080 190 - Mid-Tex Gas Division Addition 080.55710 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55710 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55710 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55710 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55728 37601 284 080 190 - Mid-Tex Gas Division Addition 080.55775 37602 127 080 190 - Mid-Tex Gas Division Addition 080.55775 38000 44 080 190 - Mid-Tex Gas Division Addition 080.55797 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55797 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55797 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55823 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55841 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55867 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55867 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55867 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55867 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55867 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55920 37602 104 080 190 - Mid-Tex Gas Division Addition 080.55920 38000 10 080 190 - Mid-Tex Gas Division Addition 080.55920 38100 20 080 190 - Mid-Tex Gas Division Addition 080.55920 38200 4 080 190 - Mid-Tex Gas Division Addition 080.55920 38300 4 080 190 - Mid-Tex Gas Division Addition 080.55923 37602 1 080 190 - Mid-Tex Gas Division Addition 080.55923 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55923 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55926 37602 13 080 190 - Mid-Tex Gas Division Addition 080.55926 38000 2 080 190 - Mid-Tex Gas Division Addition 080.55952 37601 365,316 080 190 - Mid-Tex Gas Division Addition 080.55952 37602 39,342 MTX Additions by FERC Page 12 of 101 410 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.55952 37800 151,747 080 190 - Mid-Tex Gas Division Addition 080.55961 37602 1 080 190 - Mid-Tex Gas Division Addition 080.55961 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55961 38100 0 080 190 - Mid-Tex Gas Division Addition 080.55961 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55961 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55963 37602 1 080 190 - Mid-Tex Gas Division Addition 080.55963 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55963 38100 1 080 190 - Mid-Tex Gas Division Addition 080.55963 38200 1 080 190 - Mid-Tex Gas Division Addition 080.55963 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55966 37602 1 080 190 - Mid-Tex Gas Division Addition 080.55966 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55975 37602 124 080 190 - Mid-Tex Gas Division Addition 080.55975 38000 82 080 190 - Mid-Tex Gas Division Addition 080.55976 37602 115 080 190 - Mid-Tex Gas Division Addition 080.55976 38000 77 080 190 - Mid-Tex Gas Division Addition 080.55984 37602 0 080 190 - Mid-Tex Gas Division Addition 080.55984 38000 0 080 190 - Mid-Tex Gas Division Addition 080.55984 38200 0 080 190 - Mid-Tex Gas Division Addition 080.55984 38300 0 080 190 - Mid-Tex Gas Division Addition 080.55992 37602 2 080 190 - Mid-Tex Gas Division Addition 080.55992 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56012 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56012 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56030 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56030 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56033 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56034 37602 96 080 190 - Mid-Tex Gas Division Addition 080.56034 38000 11 080 190 - Mid-Tex Gas Division Addition 080.56044 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56065 37602 1 080 190 - Mid-Tex Gas Division Addition 080.56065 38000 2 080 190 - Mid-Tex Gas Division Addition 080.56067 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56067 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56067 38100 0 080 190 - Mid-Tex Gas Division Addition 080.56067 38200 0 080 190 - Mid-Tex Gas Division Addition 080.56067 38300 0 080 190 - Mid-Tex Gas Division Addition 080.56068 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56068 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56097 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56105 37602 379 080 190 - Mid-Tex Gas Division Addition 080.56107 37602 3 080 190 - Mid-Tex Gas Division Addition 080.56107 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56107 38100 0 080 190 - Mid-Tex Gas Division Addition 080.56107 38200 0 080 190 - Mid-Tex Gas Division Addition 080.56107 38300 0 080 190 - Mid-Tex Gas Division Addition 080.56110 37600 14 080 190 - Mid-Tex Gas Division Addition 080.56144 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.56144 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.56147 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.56147 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.56150 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.56160 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56162 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.56164 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.56164 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.56173 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.56173 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.56174 37602 1 080 190 - Mid-Tex Gas Division Addition 080.56174 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56174 38100 0 080 190 - Mid-Tex Gas Division Addition 080.56174 38200 0 080 190 - Mid-Tex Gas Division Addition 080.56174 38300 0 080 190 - Mid-Tex Gas Division Addition 080.56180 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56180 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56186 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.56187 37602 1 080 190 - Mid-Tex Gas Division Addition 080.56187 38100 0 080 190 - Mid-Tex Gas Division Addition 080.56187 38200 0 080 190 - Mid-Tex Gas Division Addition 080.56187 38300 0 080 190 - Mid-Tex Gas Division Addition 080.56188 37602 1 080 190 - Mid-Tex Gas Division Addition 080.56188 38100 0 080 190 - Mid-Tex Gas Division Addition 080.56188 38200 0 080 190 - Mid-Tex Gas Division Addition 080.56188 38300 0 080 190 - Mid-Tex Gas Division Addition 080.56194 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56195 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56195 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56199 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56199 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56199 38100 0 080 190 - Mid-Tex Gas Division Addition 080.56199 38200 0 080 190 - Mid-Tex Gas Division Addition 080.56199 38300 0 080 190 - Mid-Tex Gas Division Addition 080.56200 37602 24 080 190 - Mid-Tex Gas Division Addition 080.56200 38000 19 080 190 - Mid-Tex Gas Division Addition 080.56209 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.56209 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.56222 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56222 38100 0 080 190 - Mid-Tex Gas Division Addition 080.56222 38200 0 080 190 - Mid-Tex Gas Division Addition 080.56222 38300 0 080 190 - Mid-Tex Gas Division Addition 080.56225 38000 1 080 190 - Mid-Tex Gas Division Addition 080.56225 38100 0 080 190 - Mid-Tex Gas Division Addition 080.56228 37602 6 080 190 - Mid-Tex Gas Division Addition 080.56228 38000 5 080 190 - Mid-Tex Gas Division Addition 080.56229 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.56232 37602 105 080 190 - Mid-Tex Gas Division Addition 080.56232 38000 31 080 190 - Mid-Tex Gas Division Addition 080.56232 38100 31 080 190 - Mid-Tex Gas Division Addition 080.56232 38200 10 080 190 - Mid-Tex Gas Division Addition 080.56232 38300 21 080 190 - Mid-Tex Gas Division Addition 080.56234 37602 2 080 190 - Mid-Tex Gas Division Addition 080.56234 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56236 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56237 37602 1 080 190 - Mid-Tex Gas Division Addition 080.56237 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56237 38100 0 MTX Additions by FERC Page 13 of 101 411 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.56237 38300 0 080 190 - Mid-Tex Gas Division Addition 080.56244 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56245 37602 288 080 190 - Mid-Tex Gas Division Addition 080.56245 38000 15 080 190 - Mid-Tex Gas Division Addition 080.56246 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.56249 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56251 37602 5 080 190 - Mid-Tex Gas Division Addition 080.56321 38000 500 080 190 - Mid-Tex Gas Division Addition 080.56334 38000 - 080 190 - Mid-Tex Gas Division Addition 080.56339 37601 - 080 190 - Mid-Tex Gas Division Addition 080.56339 37602 - 080 190 - Mid-Tex Gas Division Addition 080.56363 38000 395,738 080 190 - Mid-Tex Gas Division Addition 080.56364 38000 1,169,087 080 190 - Mid-Tex Gas Division Addition 080.56364 38100 - 080 190 - Mid-Tex Gas Division Addition 080.56365 38000 4,059,623 080 190 - Mid-Tex Gas Division Addition 080.56366 38000 673,116 080 190 - Mid-Tex Gas Division Addition 080.56367 38000 824,745 080 190 - Mid-Tex Gas Division Addition 080.56368 38000 1,404,951 080 190 - Mid-Tex Gas Division Addition 080.56369 38000 427,524 080 190 - Mid-Tex Gas Division Addition 080.56370 38000 722,017 080 190 - Mid-Tex Gas Division Addition 080.56370 38100 - 080 190 - Mid-Tex Gas Division Addition 080.56371 38100 264,770 080 190 - Mid-Tex Gas Division Addition 080.56371 38200 441,860 080 190 - Mid-Tex Gas Division Addition 080.56371 38300 (229,268) 080 190 - Mid-Tex Gas Division Addition 080.56372 38100 393,292 080 190 - Mid-Tex Gas Division Addition 080.56372 38200 293,587 080 190 - Mid-Tex Gas Division Addition 080.56372 38300 (176,044) 080 190 - Mid-Tex Gas Division Addition 080.56373 38100 808,332 080 190 - Mid-Tex Gas Division Addition 080.56373 38200 258,837 080 190 - Mid-Tex Gas Division Addition 080.56373 38300 (296,960) 080 190 - Mid-Tex Gas Division Addition 080.56374 38100 348,371 080 190 - Mid-Tex Gas Division Addition 080.56374 38200 168,069 080 190 - Mid-Tex Gas Division Addition 080.56374 38300 (153,297) 080 190 - Mid-Tex Gas Division Addition 080.56375 38100 246,780 080 190 - Mid-Tex Gas Division Addition 080.56375 38200 149,998 080 190 - Mid-Tex Gas Division Addition 080.56375 38300 (146,903) 080 190 - Mid-Tex Gas Division Addition 080.56376 38100 311,797 080 190 - Mid-Tex Gas Division Addition 080.56376 38200 574,137 080 190 - Mid-Tex Gas Division Addition 080.56376 38300 (272,071) 080 190 - Mid-Tex Gas Division Addition 080.56377 38100 137,578 080 190 - Mid-Tex Gas Division Addition 080.56377 38200 173,653 080 190 - Mid-Tex Gas Division Addition 080.56377 38300 (65,325) 080 190 - Mid-Tex Gas Division Addition 080.56378 38100 137,866 080 190 - Mid-Tex Gas Division Addition 080.56378 38200 134,978 080 190 - Mid-Tex Gas Division Addition 080.56378 38300 (72,163) 080 190 - Mid-Tex Gas Division Addition 080.56387 37601 (74,031) 080 190 - Mid-Tex Gas Division Addition 080.56387 37602 379,555 080 190 - Mid-Tex Gas Division Addition 080.56388 37601 (696,065) 080 190 - Mid-Tex Gas Division Addition 080.56388 37602 1,939,791 080 190 - Mid-Tex Gas Division Addition 080.56389 37601 (2,016) 080 190 - Mid-Tex Gas Division Addition 080.56389 37602 4,617 080 190 - Mid-Tex Gas Division Addition 080.56390 37601 (211,940) 080 190 - Mid-Tex Gas Division Addition 080.56390 37602 612,612 080 190 - Mid-Tex Gas Division Addition 080.56391 37601 (315,760) 080 190 - Mid-Tex Gas Division Addition 080.56391 37602 1,051,540 080 190 - Mid-Tex Gas Division Addition 080.56392 37601 124,860 080 190 - Mid-Tex Gas Division Addition 080.56392 37602 561,352 080 190 - Mid-Tex Gas Division Addition 080.56393 37601 (91,977) 080 190 - Mid-Tex Gas Division Addition 080.56393 37602 317,914 080 190 - Mid-Tex Gas Division Addition 080.56394 37601 (659,572) 080 190 - Mid-Tex Gas Division Addition 080.56394 37602 2,023,561 080 190 - Mid-Tex Gas Division Addition 080.56403 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56403 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56410 37602 2 080 190 - Mid-Tex Gas Division Addition 080.56410 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56416 37602 1 080 190 - Mid-Tex Gas Division Addition 080.56416 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56416 38100 0 080 190 - Mid-Tex Gas Division Addition 080.56416 38200 0 080 190 - Mid-Tex Gas Division Addition 080.56416 38300 0 080 190 - Mid-Tex Gas Division Addition 080.56421 37602 1 080 190 - Mid-Tex Gas Division Addition 080.56421 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56422 37602 1 080 190 - Mid-Tex Gas Division Addition 080.56422 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56430 37602 28 080 190 - Mid-Tex Gas Division Addition 080.56430 38000 12 080 190 - Mid-Tex Gas Division Addition 080.56430 38100 1 080 190 - Mid-Tex Gas Division Addition 080.56430 38200 0 080 190 - Mid-Tex Gas Division Addition 080.56430 38300 0 080 190 - Mid-Tex Gas Division Addition 080.56431 37601 2 080 190 - Mid-Tex Gas Division Addition 080.56433 37602 8 080 190 - Mid-Tex Gas Division Addition 080.56433 38000 1 080 190 - Mid-Tex Gas Division Addition 080.56433 38100 0 080 190 - Mid-Tex Gas Division Addition 080.56433 38300 0 080 190 - Mid-Tex Gas Division Addition 080.56456 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.56483 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.56497 37602 3 080 190 - Mid-Tex Gas Division Addition 080.56497 38000 1 080 190 - Mid-Tex Gas Division Addition 080.56497 38100 0 080 190 - Mid-Tex Gas Division Addition 080.56497 38200 0 080 190 - Mid-Tex Gas Division Addition 080.56497 38300 0 080 190 - Mid-Tex Gas Division Addition 080.56502 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56502 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56510 37602 27 080 190 - Mid-Tex Gas Division Addition 080.56510 38000 18 080 190 - Mid-Tex Gas Division Addition 080.56538 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.56543 37602 5 080 190 - Mid-Tex Gas Division Addition 080.56543 38000 1 080 190 - Mid-Tex Gas Division Addition 080.56543 38100 0 080 190 - Mid-Tex Gas Division Addition 080.56543 38200 0 080 190 - Mid-Tex Gas Division Addition 080.56543 38300 0 080 190 - Mid-Tex Gas Division Addition 080.56544 37602 1 080 190 - Mid-Tex Gas Division Addition 080.56544 38000 1 080 190 - Mid-Tex Gas Division Addition 080.56545 37602 7 080 190 - Mid-Tex Gas Division Addition 080.56545 38000 1 080 190 - Mid-Tex Gas Division Addition 080.56556 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56556 38000 0 MTX Additions by FERC Page 14 of 101 412 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.56567 37601 (0) 080 190 - Mid-Tex Gas Division Addition 080.56567 37800 (0) 080 190 - Mid-Tex Gas Division Addition 080.56571 37601 5,545 080 190 - Mid-Tex Gas Division Addition 080.56571 37800 115 080 190 - Mid-Tex Gas Division Addition 080.56572 37601 146 080 190 - Mid-Tex Gas Division Addition 080.56583 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.56586 37602 4 080 190 - Mid-Tex Gas Division Addition 080.56586 38000 1 080 190 - Mid-Tex Gas Division Addition 080.56593 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56593 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56598 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56611 37602 1 080 190 - Mid-Tex Gas Division Addition 080.56611 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56612 37602 6 080 190 - Mid-Tex Gas Division Addition 080.56612 38000 2 080 190 - Mid-Tex Gas Division Addition 080.56614 37602 4 080 190 - Mid-Tex Gas Division Addition 080.56614 38000 1 080 190 - Mid-Tex Gas Division Addition 080.56618 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56618 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56625 37602 103 080 190 - Mid-Tex Gas Division Addition 080.56651 37600 313 080 190 - Mid-Tex Gas Division Addition 080.56652 37602 7 080 190 - Mid-Tex Gas Division Addition 080.56662 37602 64 080 190 - Mid-Tex Gas Division Addition 080.56662 38000 10 080 190 - Mid-Tex Gas Division Addition 080.56670 37601 1,228 080 190 - Mid-Tex Gas Division Addition 080.56670 37800 4,501 080 190 - Mid-Tex Gas Division Addition 080.56680 37602 4 080 190 - Mid-Tex Gas Division Addition 080.56680 38000 2 080 190 - Mid-Tex Gas Division Addition 080.56681 37602 5 080 190 - Mid-Tex Gas Division Addition 080.56681 38000 1 080 190 - Mid-Tex Gas Division Addition 080.56685 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56686 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56686 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56717 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56717 38100 0 080 190 - Mid-Tex Gas Division Addition 080.56720 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.56722 37602 5 080 190 - Mid-Tex Gas Division Addition 080.56722 38000 1 080 190 - Mid-Tex Gas Division Addition 080.56722 38100 1 080 190 - Mid-Tex Gas Division Addition 080.56722 38200 0 080 190 - Mid-Tex Gas Division Addition 080.56722 38300 0 080 190 - Mid-Tex Gas Division Addition 080.56723 37602 (4) 080 190 - Mid-Tex Gas Division Addition 080.56723 38000 (2) 080 190 - Mid-Tex Gas Division Addition 080.56724 37602 5 080 190 - Mid-Tex Gas Division Addition 080.56724 38000 2 080 190 - Mid-Tex Gas Division Addition 080.56726 38000 1 080 190 - Mid-Tex Gas Division Addition 080.56731 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56731 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56731 38200 0 080 190 - Mid-Tex Gas Division Addition 080.56731 38300 0 080 190 - Mid-Tex Gas Division Addition 080.56735 37602 107 080 190 - Mid-Tex Gas Division Addition 080.56735 38000 117 080 190 - Mid-Tex Gas Division Addition 080.56735 38100 15 080 190 - Mid-Tex Gas Division Addition 080.56735 38200 5 080 190 - Mid-Tex Gas Division Addition 080.56735 38300 5 080 190 - Mid-Tex Gas Division Addition 080.56739 37602 1 080 190 - Mid-Tex Gas Division Addition 080.56739 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56743 37602 7 080 190 - Mid-Tex Gas Division Addition 080.56743 38000 2 080 190 - Mid-Tex Gas Division Addition 080.56747 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.56747 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.56756 37602 1 080 190 - Mid-Tex Gas Division Addition 080.56800 37601 0 080 190 - Mid-Tex Gas Division Addition 080.56800 37602 25 080 190 - Mid-Tex Gas Division Addition 080.56800 38000 1 080 190 - Mid-Tex Gas Division Addition 080.56809 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56809 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56810 37602 37 080 190 - Mid-Tex Gas Division Addition 080.56810 38000 11 080 190 - Mid-Tex Gas Division Addition 080.56810 38100 3 080 190 - Mid-Tex Gas Division Addition 080.56810 38200 1 080 190 - Mid-Tex Gas Division Addition 080.56810 38300 2 080 190 - Mid-Tex Gas Division Addition 080.56817 37601 (0) 080 190 - Mid-Tex Gas Division Addition 080.56817 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.56826 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56828 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56855 37602 7,141 080 190 - Mid-Tex Gas Division Addition 080.56855 38000 1,175 080 190 - Mid-Tex Gas Division Addition 080.56856 37602 4,166 080 190 - Mid-Tex Gas Division Addition 080.56856 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56857 37602 (894) 080 190 - Mid-Tex Gas Division Addition 080.56857 38000 (894) 080 190 - Mid-Tex Gas Division Addition 080.56858 37602 557,821 080 190 - Mid-Tex Gas Division Addition 080.56858 38000 (223,119) 080 190 - Mid-Tex Gas Division Addition 080.56860 37602 320,058 080 190 - Mid-Tex Gas Division Addition 080.56860 38000 (55,059) 080 190 - Mid-Tex Gas Division Addition 080.56861 37602 43 080 190 - Mid-Tex Gas Division Addition 080.56861 38000 (34) 080 190 - Mid-Tex Gas Division Addition 080.56862 37602 259,502 080 190 - Mid-Tex Gas Division Addition 080.56862 38000 (68,236) 080 190 - Mid-Tex Gas Division Addition 080.56863 37602 540,509 080 190 - Mid-Tex Gas Division Addition 080.56863 38000 (97,418) 080 190 - Mid-Tex Gas Division Addition 080.56864 37602 216,802 080 190 - Mid-Tex Gas Division Addition 080.56864 38000 (38,338) 080 190 - Mid-Tex Gas Division Addition 080.56865 37602 81,127 080 190 - Mid-Tex Gas Division Addition 080.56865 38000 (18,180) 080 190 - Mid-Tex Gas Division Addition 080.56866 37602 43,572 080 190 - Mid-Tex Gas Division Addition 080.56866 38000 (34,616) 080 190 - Mid-Tex Gas Division Addition 080.56867 37602 368,584 080 190 - Mid-Tex Gas Division Addition 080.56867 38000 (32,301) 080 190 - Mid-Tex Gas Division Addition 080.56869 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56869 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56870 37601 186 080 190 - Mid-Tex Gas Division Addition 080.56870 37602 40 080 190 - Mid-Tex Gas Division Addition 080.56870 38000 (147) 080 190 - Mid-Tex Gas Division Addition 080.56871 37602 30,887 080 190 - Mid-Tex Gas Division Addition 080.56871 38000 (24,445) MTX Additions by FERC Page 15 of 101 413 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.56872 37602 3 080 190 - Mid-Tex Gas Division Addition 080.56872 38000 3 080 190 - Mid-Tex Gas Division Addition 080.56873 37602 74,119 080 190 - Mid-Tex Gas Division Addition 080.56873 38000 (55,516) 080 190 - Mid-Tex Gas Division Addition 080.56874 37602 62,182 080 190 - Mid-Tex Gas Division Addition 080.56874 38000 (47,729) 080 190 - Mid-Tex Gas Division Addition 080.56875 37602 (8) 080 190 - Mid-Tex Gas Division Addition 080.56875 38000 (8) 080 190 - Mid-Tex Gas Division Addition 080.56876 37602 174,117 080 190 - Mid-Tex Gas Division Addition 080.56876 38000 146,949 080 190 - Mid-Tex Gas Division Addition 080.56882 37602 2 080 190 - Mid-Tex Gas Division Addition 080.56882 38000 1 080 190 - Mid-Tex Gas Division Addition 080.56882 38100 1 080 190 - Mid-Tex Gas Division Addition 080.56882 38200 1 080 190 - Mid-Tex Gas Division Addition 080.56882 38300 1 080 190 - Mid-Tex Gas Division Addition 080.56884 37602 111 080 190 - Mid-Tex Gas Division Addition 080.56884 38000 48 080 190 - Mid-Tex Gas Division Addition 080.56891 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56891 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56897 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.56904 37602 1 080 190 - Mid-Tex Gas Division Addition 080.56904 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56904 38100 0 080 190 - Mid-Tex Gas Division Addition 080.56904 38200 0 080 190 - Mid-Tex Gas Division Addition 080.56904 38300 0 080 190 - Mid-Tex Gas Division Addition 080.56917 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.56917 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.56918 37602 196 080 190 - Mid-Tex Gas Division Addition 080.56918 38000 49 080 190 - Mid-Tex Gas Division Addition 080.56919 37602 39 080 190 - Mid-Tex Gas Division Addition 080.56919 38000 32 080 190 - Mid-Tex Gas Division Addition 080.56920 37602 172 080 190 - Mid-Tex Gas Division Addition 080.56920 38000 147 080 190 - Mid-Tex Gas Division Addition 080.56921 37602 2 080 190 - Mid-Tex Gas Division Addition 080.56921 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56922 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56922 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56928 37602 1 080 190 - Mid-Tex Gas Division Addition 080.56938 37602 6 080 190 - Mid-Tex Gas Division Addition 080.56938 38000 2 080 190 - Mid-Tex Gas Division Addition 080.56949 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.56953 37601 38,744 080 190 - Mid-Tex Gas Division Addition 080.56974 37602 1 080 190 - Mid-Tex Gas Division Addition 080.56974 38000 0 080 190 - Mid-Tex Gas Division Addition 080.56975 37602 31 080 190 - Mid-Tex Gas Division Addition 080.56975 38000 3 080 190 - Mid-Tex Gas Division Addition 080.56981 38000 2 080 190 - Mid-Tex Gas Division Addition 080.56981 38500 17 080 190 - Mid-Tex Gas Division Addition 080.56988 37602 0 080 190 - Mid-Tex Gas Division Addition 080.56989 37602 2 080 190 - Mid-Tex Gas Division Addition 080.56989 38000 2 080 190 - Mid-Tex Gas Division Addition 080.56991 37602 3 080 190 - Mid-Tex Gas Division Addition 080.56991 38000 1 080 190 - Mid-Tex Gas Division Addition 080.56991 38100 0 080 190 - Mid-Tex Gas Division Addition 080.56991 38200 0 080 190 - Mid-Tex Gas Division Addition 080.56991 38300 0 080 190 - Mid-Tex Gas Division Addition 080.56995 37602 2 080 190 - Mid-Tex Gas Division Addition 080.56995 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57011 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57013 37602 3 080 190 - Mid-Tex Gas Division Addition 080.57013 38000 1 080 190 - Mid-Tex Gas Division Addition 080.57045 37601 86 080 190 - Mid-Tex Gas Division Addition 080.57053 37602 3 080 190 - Mid-Tex Gas Division Addition 080.57053 38000 2 080 190 - Mid-Tex Gas Division Addition 080.57058 37602 3 080 190 - Mid-Tex Gas Division Addition 080.57058 38000 1 080 190 - Mid-Tex Gas Division Addition 080.57061 37602 4 080 190 - Mid-Tex Gas Division Addition 080.57061 38000 (1) 080 190 - Mid-Tex Gas Division Addition 080.57061 38100 (2) 080 190 - Mid-Tex Gas Division Addition 080.57063 37602 82,391 080 190 - Mid-Tex Gas Division Addition 080.57063 38000 23,664 080 190 - Mid-Tex Gas Division Addition 080.57069 37602 4 080 190 - Mid-Tex Gas Division Addition 080.57069 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57069 38100 0 080 190 - Mid-Tex Gas Division Addition 080.57069 38200 0 080 190 - Mid-Tex Gas Division Addition 080.57069 38300 0 080 190 - Mid-Tex Gas Division Addition 080.57070 37602 13 080 190 - Mid-Tex Gas Division Addition 080.57070 38000 3 080 190 - Mid-Tex Gas Division Addition 080.57071 37602 6 080 190 - Mid-Tex Gas Division Addition 080.57071 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57072 37602 3 080 190 - Mid-Tex Gas Division Addition 080.57072 38000 3 080 190 - Mid-Tex Gas Division Addition 080.57076 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57076 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57090 37602 1 080 190 - Mid-Tex Gas Division Addition 080.57090 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57090 38100 0 080 190 - Mid-Tex Gas Division Addition 080.57090 38200 0 080 190 - Mid-Tex Gas Division Addition 080.57090 38300 0 080 190 - Mid-Tex Gas Division Addition 080.57104 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57123 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57123 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57123 38200 0 080 190 - Mid-Tex Gas Division Addition 080.57134 37602 4 080 190 - Mid-Tex Gas Division Addition 080.57134 38000 1 080 190 - Mid-Tex Gas Division Addition 080.57147 37601 2,128 080 190 - Mid-Tex Gas Division Addition 080.57147 37800 236 080 190 - Mid-Tex Gas Division Addition 080.57171 37602 118 080 190 - Mid-Tex Gas Division Addition 080.57171 38000 29 080 190 - Mid-Tex Gas Division Addition 080.57193 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57193 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57202 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57225 37800 (0) 080 190 - Mid-Tex Gas Division Addition 080.57240 37602 7 080 190 - Mid-Tex Gas Division Addition 080.57240 38000 2 080 190 - Mid-Tex Gas Division Addition 080.57247 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57248 37602 (2) MTX Additions by FERC Page 16 of 101 414 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.57259 37602 1 080 190 - Mid-Tex Gas Division Addition 080.57259 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57261 37602 852 080 190 - Mid-Tex Gas Division Addition 080.57261 38000 213 080 190 - Mid-Tex Gas Division Addition 080.57262 37602 1 080 190 - Mid-Tex Gas Division Addition 080.57269 37602 3 080 190 - Mid-Tex Gas Division Addition 080.57269 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57278 37602 2 080 190 - Mid-Tex Gas Division Addition 080.57278 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57278 38100 0 080 190 - Mid-Tex Gas Division Addition 080.57278 38200 0 080 190 - Mid-Tex Gas Division Addition 080.57278 38300 0 080 190 - Mid-Tex Gas Division Addition 080.57282 37602 70 080 190 - Mid-Tex Gas Division Addition 080.57285 37602 2 080 190 - Mid-Tex Gas Division Addition 080.57285 38000 4 080 190 - Mid-Tex Gas Division Addition 080.57293 37602 3 080 190 - Mid-Tex Gas Division Addition 080.57293 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57294 37602 654 080 190 - Mid-Tex Gas Division Addition 080.57294 38000 115 080 190 - Mid-Tex Gas Division Addition 080.57296 37601 (0) 080 190 - Mid-Tex Gas Division Addition 080.57296 37800 (0) 080 190 - Mid-Tex Gas Division Addition 080.57312 37602 114 080 190 - Mid-Tex Gas Division Addition 080.57312 38000 13 080 190 - Mid-Tex Gas Division Addition 080.57344 37602 31,340 080 190 - Mid-Tex Gas Division Addition 080.57348 37601 0 080 190 - Mid-Tex Gas Division Addition 080.57348 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57370 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57371 37602 2 080 190 - Mid-Tex Gas Division Addition 080.57371 38000 1 080 190 - Mid-Tex Gas Division Addition 080.57371 38100 0 080 190 - Mid-Tex Gas Division Addition 080.57371 38200 0 080 190 - Mid-Tex Gas Division Addition 080.57371 38300 0 080 190 - Mid-Tex Gas Division Addition 080.57374 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57374 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57388 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57388 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57388 38100 1 080 190 - Mid-Tex Gas Division Addition 080.57391 37602 6 080 190 - Mid-Tex Gas Division Addition 080.57391 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57392 37602 24 080 190 - Mid-Tex Gas Division Addition 080.57392 38000 7 080 190 - Mid-Tex Gas Division Addition 080.57393 37602 30 080 190 - Mid-Tex Gas Division Addition 080.57393 38000 10 080 190 - Mid-Tex Gas Division Addition 080.57396 37602 35 080 190 - Mid-Tex Gas Division Addition 080.57396 38000 9 080 190 - Mid-Tex Gas Division Addition 080.57397 37602 46 080 190 - Mid-Tex Gas Division Addition 080.57397 38000 11 080 190 - Mid-Tex Gas Division Addition 080.57399 37602 35 080 190 - Mid-Tex Gas Division Addition 080.57399 38000 5 080 190 - Mid-Tex Gas Division Addition 080.57400 37602 88 080 190 - Mid-Tex Gas Division Addition 080.57400 38000 38 080 190 - Mid-Tex Gas Division Addition 080.57402 37602 61 080 190 - Mid-Tex Gas Division Addition 080.57402 38000 31 080 190 - Mid-Tex Gas Division Addition 080.57405 37602 73 080 190 - Mid-Tex Gas Division Addition 080.57405 38000 49 080 190 - Mid-Tex Gas Division Addition 080.57406 37602 34 080 190 - Mid-Tex Gas Division Addition 080.57406 38000 14 080 190 - Mid-Tex Gas Division Addition 080.57419 37602 1 080 190 - Mid-Tex Gas Division Addition 080.57431 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.57435 37602 (11) 080 190 - Mid-Tex Gas Division Addition 080.57437 37601 113 080 190 - Mid-Tex Gas Division Addition 080.57446 37601 (0) 080 190 - Mid-Tex Gas Division Addition 080.57448 37600 15,319 080 190 - Mid-Tex Gas Division Addition 080.57448 37601 367,646 080 190 - Mid-Tex Gas Division Addition 080.57478 37601 (0) 080 190 - Mid-Tex Gas Division Addition 080.57492 37800 (0) 080 190 - Mid-Tex Gas Division Addition 080.57493 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.57497 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57497 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57498 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57498 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57499 37602 18 080 190 - Mid-Tex Gas Division Addition 080.57499 38000 6 080 190 - Mid-Tex Gas Division Addition 080.57502 37602 5 080 190 - Mid-Tex Gas Division Addition 080.57502 38000 1 080 190 - Mid-Tex Gas Division Addition 080.57503 37602 8 080 190 - Mid-Tex Gas Division Addition 080.57503 38000 3 080 190 - Mid-Tex Gas Division Addition 080.57508 37602 5 080 190 - Mid-Tex Gas Division Addition 080.57508 38000 20 080 190 - Mid-Tex Gas Division Addition 080.57509 37602 1 080 190 - Mid-Tex Gas Division Addition 080.57509 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57510 37602 1 080 190 - Mid-Tex Gas Division Addition 080.57510 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57525 37602 43 080 190 - Mid-Tex Gas Division Addition 080.57525 38000 51 080 190 - Mid-Tex Gas Division Addition 080.57528 37602 105 080 190 - Mid-Tex Gas Division Addition 080.57528 38000 19 080 190 - Mid-Tex Gas Division Addition 080.57529 37602 1 080 190 - Mid-Tex Gas Division Addition 080.57529 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57540 37602 16 080 190 - Mid-Tex Gas Division Addition 080.57540 38000 4 080 190 - Mid-Tex Gas Division Addition 080.57549 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57549 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57551 37602 23 080 190 - Mid-Tex Gas Division Addition 080.57551 38000 6 080 190 - Mid-Tex Gas Division Addition 080.57552 37602 5 080 190 - Mid-Tex Gas Division Addition 080.57552 38000 2 080 190 - Mid-Tex Gas Division Addition 080.57568 37602 125 080 190 - Mid-Tex Gas Division Addition 080.57579 37602 2 080 190 - Mid-Tex Gas Division Addition 080.57579 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57580 37602 4 080 190 - Mid-Tex Gas Division Addition 080.57580 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57580 38100 0 080 190 - Mid-Tex Gas Division Addition 080.57580 38200 0 080 190 - Mid-Tex Gas Division Addition 080.57580 38300 0 080 190 - Mid-Tex Gas Division Addition 080.57607 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57607 38000 0 MTX Additions by FERC Page 17 of 101 415 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.57607 38200 0 080 190 - Mid-Tex Gas Division Addition 080.57615 38000 10 080 190 - Mid-Tex Gas Division Addition 080.57615 38100 2 080 190 - Mid-Tex Gas Division Addition 080.57615 38200 1 080 190 - Mid-Tex Gas Division Addition 080.57615 38300 1 080 190 - Mid-Tex Gas Division Addition 080.57629 37800 14 080 190 - Mid-Tex Gas Division Addition 080.57630 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.57632 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.57658 37602 47 080 190 - Mid-Tex Gas Division Addition 080.57658 38000 30 080 190 - Mid-Tex Gas Division Addition 080.57665 37601 37 080 190 - Mid-Tex Gas Division Addition 080.57665 37800 129 080 190 - Mid-Tex Gas Division Addition 080.57672 37602 5 080 190 - Mid-Tex Gas Division Addition 080.57672 38000 3 080 190 - Mid-Tex Gas Division Addition 080.57675 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57675 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57679 37602 69 080 190 - Mid-Tex Gas Division Addition 080.57679 38000 66 080 190 - Mid-Tex Gas Division Addition 080.57693 37601 9 080 190 - Mid-Tex Gas Division Addition 080.57697 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.57703 37600 0 080 190 - Mid-Tex Gas Division Addition 080.57703 37601 2 080 190 - Mid-Tex Gas Division Addition 080.57711 37602 1 080 190 - Mid-Tex Gas Division Addition 080.57716 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.57725 37602 65 080 190 - Mid-Tex Gas Division Addition 080.57725 38000 43 080 190 - Mid-Tex Gas Division Addition 080.57729 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57729 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57747 37602 6 080 190 - Mid-Tex Gas Division Addition 080.57747 38000 3 080 190 - Mid-Tex Gas Division Addition 080.57753 37602 1 080 190 - Mid-Tex Gas Division Addition 080.57753 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57754 37602 52 080 190 - Mid-Tex Gas Division Addition 080.57754 38000 17 080 190 - Mid-Tex Gas Division Addition 080.57755 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57756 37601 2 080 190 - Mid-Tex Gas Division Addition 080.57756 37602 2 080 190 - Mid-Tex Gas Division Addition 080.57756 37800 29 080 190 - Mid-Tex Gas Division Addition 080.57757 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.57758 37602 1 080 190 - Mid-Tex Gas Division Addition 080.57758 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57763 37602 1 080 190 - Mid-Tex Gas Division Addition 080.57763 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57767 37602 10 080 190 - Mid-Tex Gas Division Addition 080.57767 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57767 38100 0 080 190 - Mid-Tex Gas Division Addition 080.57767 38200 0 080 190 - Mid-Tex Gas Division Addition 080.57767 38300 0 080 190 - Mid-Tex Gas Division Addition 080.57795 37602 29 080 190 - Mid-Tex Gas Division Addition 080.57795 38000 5 080 190 - Mid-Tex Gas Division Addition 080.57796 37602 15 080 190 - Mid-Tex Gas Division Addition 080.57796 38000 5 080 190 - Mid-Tex Gas Division Addition 080.57800 37602 36 080 190 - Mid-Tex Gas Division Addition 080.57800 38000 1 080 190 - Mid-Tex Gas Division Addition 080.57809 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.57818 37602 1 080 190 - Mid-Tex Gas Division Addition 080.57818 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57820 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.57823 37602 43 080 190 - Mid-Tex Gas Division Addition 080.57823 38000 29 080 190 - Mid-Tex Gas Division Addition 080.57824 37601 230 080 190 - Mid-Tex Gas Division Addition 080.57824 37800 41 080 190 - Mid-Tex Gas Division Addition 080.57848 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57852 37602 4 080 190 - Mid-Tex Gas Division Addition 080.57852 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57856 37602 49 080 190 - Mid-Tex Gas Division Addition 080.57856 38000 30 080 190 - Mid-Tex Gas Division Addition 080.57859 37602 58 080 190 - Mid-Tex Gas Division Addition 080.57859 38000 39 080 190 - Mid-Tex Gas Division Addition 080.57861 37602 269 080 190 - Mid-Tex Gas Division Addition 080.57861 38000 67 080 190 - Mid-Tex Gas Division Addition 080.57866 37602 49 080 190 - Mid-Tex Gas Division Addition 080.57866 38000 12 080 190 - Mid-Tex Gas Division Addition 080.57874 37602 93 080 190 - Mid-Tex Gas Division Addition 080.57874 38000 12 080 190 - Mid-Tex Gas Division Addition 080.57877 37601 79 080 190 - Mid-Tex Gas Division Addition 080.57879 37800 33 080 190 - Mid-Tex Gas Division Addition 080.57902 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57904 37602 2 080 190 - Mid-Tex Gas Division Addition 080.57904 38000 2 080 190 - Mid-Tex Gas Division Addition 080.57908 37602 60 080 190 - Mid-Tex Gas Division Addition 080.57908 38000 23 080 190 - Mid-Tex Gas Division Addition 080.57909 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.57914 37602 17 080 190 - Mid-Tex Gas Division Addition 080.57914 38000 18 080 190 - Mid-Tex Gas Division Addition 080.57915 37602 51 080 190 - Mid-Tex Gas Division Addition 080.57915 38000 36 080 190 - Mid-Tex Gas Division Addition 080.57916 37602 0 080 190 - Mid-Tex Gas Division Addition 080.57924 37602 3 080 190 - Mid-Tex Gas Division Addition 080.57924 38000 1 080 190 - Mid-Tex Gas Division Addition 080.57926 37602 31 080 190 - Mid-Tex Gas Division Addition 080.57926 38000 3 080 190 - Mid-Tex Gas Division Addition 080.57929 37602 4 080 190 - Mid-Tex Gas Division Addition 080.57929 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57932 37602 1 080 190 - Mid-Tex Gas Division Addition 080.57932 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57938 37602 854 080 190 - Mid-Tex Gas Division Addition 080.57938 38000 214 080 190 - Mid-Tex Gas Division Addition 080.57940 37602 13 080 190 - Mid-Tex Gas Division Addition 080.57941 37602 13 080 190 - Mid-Tex Gas Division Addition 080.57941 38000 1 080 190 - Mid-Tex Gas Division Addition 080.57944 37602 8 080 190 - Mid-Tex Gas Division Addition 080.57944 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57954 37602 8 080 190 - Mid-Tex Gas Division Addition 080.57954 38000 2 080 190 - Mid-Tex Gas Division Addition 080.57959 37602 1 080 190 - Mid-Tex Gas Division Addition 080.57959 38000 0 MTX Additions by FERC Page 18 of 101 416 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.57960 37602 12 080 190 - Mid-Tex Gas Division Addition 080.57960 38000 6 080 190 - Mid-Tex Gas Division Addition 080.57963 37602 6 080 190 - Mid-Tex Gas Division Addition 080.57963 38000 1 080 190 - Mid-Tex Gas Division Addition 080.57964 37601 110 080 190 - Mid-Tex Gas Division Addition 080.57971 37602 29 080 190 - Mid-Tex Gas Division Addition 080.57971 38000 0 080 190 - Mid-Tex Gas Division Addition 080.57983 37601 112,957 080 190 - Mid-Tex Gas Division Addition 080.57983 37602 26,895 080 190 - Mid-Tex Gas Division Addition 080.57983 37800 129,093 080 190 - Mid-Tex Gas Division Addition 080.57985 37601 77,493 080 190 - Mid-Tex Gas Division Addition 080.57986 37601 56,805 080 190 - Mid-Tex Gas Division Addition 080.57986 37800 1,515 080 190 - Mid-Tex Gas Division Addition 080.57990 37800 23 080 190 - Mid-Tex Gas Division Addition 080.57991 37602 7 080 190 - Mid-Tex Gas Division Addition 080.57991 38000 1 080 190 - Mid-Tex Gas Division Addition 080.57992 37602 6 080 190 - Mid-Tex Gas Division Addition 080.57992 38000 4 080 190 - Mid-Tex Gas Division Addition 080.57993 37602 32 080 190 - Mid-Tex Gas Division Addition 080.57993 38000 22 080 190 - Mid-Tex Gas Division Addition 080.57997 37602 86 080 190 - Mid-Tex Gas Division Addition 080.57997 38000 39 080 190 - Mid-Tex Gas Division Addition 080.58003 37602 1 080 190 - Mid-Tex Gas Division Addition 080.58003 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58009 37602 17 080 190 - Mid-Tex Gas Division Addition 080.58009 38000 7 080 190 - Mid-Tex Gas Division Addition 080.58012 37602 22 080 190 - Mid-Tex Gas Division Addition 080.58012 38000 5 080 190 - Mid-Tex Gas Division Addition 080.58013 37602 (19) 080 190 - Mid-Tex Gas Division Addition 080.58013 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.58020 37602 63 080 190 - Mid-Tex Gas Division Addition 080.58020 38000 34 080 190 - Mid-Tex Gas Division Addition 080.58023 37602 25 080 190 - Mid-Tex Gas Division Addition 080.58023 38000 21 080 190 - Mid-Tex Gas Division Addition 080.58024 37602 225 080 190 - Mid-Tex Gas Division Addition 080.58024 38000 98 080 190 - Mid-Tex Gas Division Addition 080.58026 37601 10 080 190 - Mid-Tex Gas Division Addition 080.58026 38000 6 080 190 - Mid-Tex Gas Division Addition 080.58027 37602 58 080 190 - Mid-Tex Gas Division Addition 080.58027 38000 5 080 190 - Mid-Tex Gas Division Addition 080.58029 37602 12 080 190 - Mid-Tex Gas Division Addition 080.58029 38000 7 080 190 - Mid-Tex Gas Division Addition 080.58034 37602 7 080 190 - Mid-Tex Gas Division Addition 080.58034 38000 1 080 190 - Mid-Tex Gas Division Addition 080.58036 37602 29 080 190 - Mid-Tex Gas Division Addition 080.58036 38000 16 080 190 - Mid-Tex Gas Division Addition 080.58037 37602 125 080 190 - Mid-Tex Gas Division Addition 080.58037 38000 67 080 190 - Mid-Tex Gas Division Addition 080.58038 37602 48 080 190 - Mid-Tex Gas Division Addition 080.58038 38000 33 080 190 - Mid-Tex Gas Division Addition 080.58040 37602 23 080 190 - Mid-Tex Gas Division Addition 080.58040 38000 15 080 190 - Mid-Tex Gas Division Addition 080.58042 37602 24 080 190 - Mid-Tex Gas Division Addition 080.58042 38000 16 080 190 - Mid-Tex Gas Division Addition 080.58051 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.58052 37602 11 080 190 - Mid-Tex Gas Division Addition 080.58052 38000 1 080 190 - Mid-Tex Gas Division Addition 080.58054 37602 29 080 190 - Mid-Tex Gas Division Addition 080.58054 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58055 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.58056 38000 2 080 190 - Mid-Tex Gas Division Addition 080.58060 37602 121 080 190 - Mid-Tex Gas Division Addition 080.58060 38000 13 080 190 - Mid-Tex Gas Division Addition 080.58061 38000 88 080 190 - Mid-Tex Gas Division Addition 080.58085 37602 55 080 190 - Mid-Tex Gas Division Addition 080.58085 38000 15 080 190 - Mid-Tex Gas Division Addition 080.58086 37602 64 080 190 - Mid-Tex Gas Division Addition 080.58086 38000 11 080 190 - Mid-Tex Gas Division Addition 080.58087 38000 4 080 190 - Mid-Tex Gas Division Addition 080.58088 38000 192 080 190 - Mid-Tex Gas Division Addition 080.58099 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.58099 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.58100 37602 2,058 080 190 - Mid-Tex Gas Division Addition 080.58100 38000 686 080 190 - Mid-Tex Gas Division Addition 080.58101 37602 31 080 190 - Mid-Tex Gas Division Addition 080.58101 38000 9 080 190 - Mid-Tex Gas Division Addition 080.58103 37602 28 080 190 - Mid-Tex Gas Division Addition 080.58103 38000 8 080 190 - Mid-Tex Gas Division Addition 080.58104 37602 7 080 190 - Mid-Tex Gas Division Addition 080.58104 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58105 37602 186 080 190 - Mid-Tex Gas Division Addition 080.58105 38000 4 080 190 - Mid-Tex Gas Division Addition 080.58107 37602 17 080 190 - Mid-Tex Gas Division Addition 080.58107 38000 3 080 190 - Mid-Tex Gas Division Addition 080.58109 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.58110 37602 5 080 190 - Mid-Tex Gas Division Addition 080.58110 37800 4 080 190 - Mid-Tex Gas Division Addition 080.58112 37602 (4) 080 190 - Mid-Tex Gas Division Addition 080.58113 37602 1 080 190 - Mid-Tex Gas Division Addition 080.58113 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58115 38000 11 080 190 - Mid-Tex Gas Division Addition 080.58117 37602 53 080 190 - Mid-Tex Gas Division Addition 080.58117 38000 6 080 190 - Mid-Tex Gas Division Addition 080.58119 37602 1 080 190 - Mid-Tex Gas Division Addition 080.58119 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58131 37602 3 080 190 - Mid-Tex Gas Division Addition 080.58147 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.58149 37602 13 080 190 - Mid-Tex Gas Division Addition 080.58153 37602 38 080 190 - Mid-Tex Gas Division Addition 080.58153 38000 1 080 190 - Mid-Tex Gas Division Addition 080.58154 37602 386 080 190 - Mid-Tex Gas Division Addition 080.58154 38000 129 080 190 - Mid-Tex Gas Division Addition 080.58158 37601 57 080 190 - Mid-Tex Gas Division Addition 080.58159 37602 114 080 190 - Mid-Tex Gas Division Addition 080.58159 38000 21 080 190 - Mid-Tex Gas Division Addition 080.58161 37602 56 080 190 - Mid-Tex Gas Division Addition 080.58161 38000 12 MTX Additions by FERC Page 19 of 101 417 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.58162 38000 30 080 190 - Mid-Tex Gas Division Addition 080.58167 37602 57 080 190 - Mid-Tex Gas Division Addition 080.58167 38000 3 080 190 - Mid-Tex Gas Division Addition 080.58169 37601 2 080 190 - Mid-Tex Gas Division Addition 080.58169 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58172 38000 12 080 190 - Mid-Tex Gas Division Addition 080.58174 37602 17 080 190 - Mid-Tex Gas Division Addition 080.58192 37800 (0) 080 190 - Mid-Tex Gas Division Addition 080.58195 37602 1 080 190 - Mid-Tex Gas Division Addition 080.58195 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58204 37602 3 080 190 - Mid-Tex Gas Division Addition 080.58204 38000 1 080 190 - Mid-Tex Gas Division Addition 080.58212 37602 19 080 190 - Mid-Tex Gas Division Addition 080.58217 37602 70 080 190 - Mid-Tex Gas Division Addition 080.58217 38000 8 080 190 - Mid-Tex Gas Division Addition 080.58218 37602 23 080 190 - Mid-Tex Gas Division Addition 080.58225 37602 37 080 190 - Mid-Tex Gas Division Addition 080.58225 38000 12 080 190 - Mid-Tex Gas Division Addition 080.58229 37602 1 080 190 - Mid-Tex Gas Division Addition 080.58229 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58233 37602 2 080 190 - Mid-Tex Gas Division Addition 080.58233 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58234 37601 0 080 190 - Mid-Tex Gas Division Addition 080.58242 37602 5 080 190 - Mid-Tex Gas Division Addition 080.58242 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58252 37602 6 080 190 - Mid-Tex Gas Division Addition 080.58252 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58254 37602 7 080 190 - Mid-Tex Gas Division Addition 080.58258 37602 6 080 190 - Mid-Tex Gas Division Addition 080.58258 38000 6 080 190 - Mid-Tex Gas Division Addition 080.58265 37602 40 080 190 - Mid-Tex Gas Division Addition 080.58265 38000 8 080 190 - Mid-Tex Gas Division Addition 080.58267 37602 112 080 190 - Mid-Tex Gas Division Addition 080.58267 38000 6 080 190 - Mid-Tex Gas Division Addition 080.58276 37602 48 080 190 - Mid-Tex Gas Division Addition 080.58276 38000 12 080 190 - Mid-Tex Gas Division Addition 080.58306 37602 28 080 190 - Mid-Tex Gas Division Addition 080.58306 38000 7 080 190 - Mid-Tex Gas Division Addition 080.58320 37602 3 080 190 - Mid-Tex Gas Division Addition 080.58320 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58327 37602 36 080 190 - Mid-Tex Gas Division Addition 080.58327 38000 2 080 190 - Mid-Tex Gas Division Addition 080.58329 37602 20 080 190 - Mid-Tex Gas Division Addition 080.58329 38000 2 080 190 - Mid-Tex Gas Division Addition 080.58330 37602 4 080 190 - Mid-Tex Gas Division Addition 080.58330 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58340 37602 0 080 190 - Mid-Tex Gas Division Addition 080.58359 37602 112 080 190 - Mid-Tex Gas Division Addition 080.58359 38000 28 080 190 - Mid-Tex Gas Division Addition 080.58361 37602 88 080 190 - Mid-Tex Gas Division Addition 080.58361 38000 11 080 190 - Mid-Tex Gas Division Addition 080.58372 37602 1,649 080 190 - Mid-Tex Gas Division Addition 080.58373 37601 22 080 190 - Mid-Tex Gas Division Addition 080.58373 37602 2 080 190 - Mid-Tex Gas Division Addition 080.58373 37800 175 080 190 - Mid-Tex Gas Division Addition 080.58384 37602 0 080 190 - Mid-Tex Gas Division Addition 080.58387 37602 7 080 190 - Mid-Tex Gas Division Addition 080.58387 38000 1 080 190 - Mid-Tex Gas Division Addition 080.58413 37602 5,155 080 190 - Mid-Tex Gas Division Addition 080.58429 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.58444 37602 33 080 190 - Mid-Tex Gas Division Addition 080.58451 37602 4,796 080 190 - Mid-Tex Gas Division Addition 080.58451 38000 1,199 080 190 - Mid-Tex Gas Division Addition 080.58452 38000 9 080 190 - Mid-Tex Gas Division Addition 080.58460 37602 0 080 190 - Mid-Tex Gas Division Addition 080.58460 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58462 37602 1,032 080 190 - Mid-Tex Gas Division Addition 080.58462 38000 102 080 190 - Mid-Tex Gas Division Addition 080.58469 37602 33 080 190 - Mid-Tex Gas Division Addition 080.58480 37602 3 080 190 - Mid-Tex Gas Division Addition 080.58484 37602 68 080 190 - Mid-Tex Gas Division Addition 080.58485 38000 29 080 190 - Mid-Tex Gas Division Addition 080.58490 37602 40 080 190 - Mid-Tex Gas Division Addition 080.58490 38000 1 080 190 - Mid-Tex Gas Division Addition 080.58494 37602 1 080 190 - Mid-Tex Gas Division Addition 080.58499 37602 20 080 190 - Mid-Tex Gas Division Addition 080.58508 37602 3,299 080 190 - Mid-Tex Gas Division Addition 080.58509 37602 2 080 190 - Mid-Tex Gas Division Addition 080.58509 38000 2 080 190 - Mid-Tex Gas Division Addition 080.58514 37602 56 080 190 - Mid-Tex Gas Division Addition 080.58514 38000 3 080 190 - Mid-Tex Gas Division Addition 080.58515 37602 2 080 190 - Mid-Tex Gas Division Addition 080.58544 37602 3,299 080 190 - Mid-Tex Gas Division Addition 080.58545 37602 49 080 190 - Mid-Tex Gas Division Addition 080.58545 38000 11 080 190 - Mid-Tex Gas Division Addition 080.58551 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.58564 37602 0 080 190 - Mid-Tex Gas Division Addition 080.58564 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58577 37602 76 080 190 - Mid-Tex Gas Division Addition 080.58577 38000 2 080 190 - Mid-Tex Gas Division Addition 080.58583 37601 8 080 190 - Mid-Tex Gas Division Addition 080.58587 37602 1 080 190 - Mid-Tex Gas Division Addition 080.58587 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58590 37601 651 080 190 - Mid-Tex Gas Division Addition 080.58593 37602 29 080 190 - Mid-Tex Gas Division Addition 080.58593 38000 18 080 190 - Mid-Tex Gas Division Addition 080.58594 37602 10 080 190 - Mid-Tex Gas Division Addition 080.58594 38000 3 080 190 - Mid-Tex Gas Division Addition 080.58598 37601 92 080 190 - Mid-Tex Gas Division Addition 080.58598 37800 83 080 190 - Mid-Tex Gas Division Addition 080.58608 37602 3 080 190 - Mid-Tex Gas Division Addition 080.58610 37602 7 080 190 - Mid-Tex Gas Division Addition 080.58618 37602 28 080 190 - Mid-Tex Gas Division Addition 080.58618 38000 7 080 190 - Mid-Tex Gas Division Addition 080.58619 37602 86 080 190 - Mid-Tex Gas Division Addition 080.58619 38000 28 080 190 - Mid-Tex Gas Division Addition 080.58620 37602 44 MTX Additions by FERC Page 20 of 101 418 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.58620 38000 15 080 190 - Mid-Tex Gas Division Addition 080.58621 37602 6 080 190 - Mid-Tex Gas Division Addition 080.58621 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58622 37602 14 080 190 - Mid-Tex Gas Division Addition 080.58622 38000 4 080 190 - Mid-Tex Gas Division Addition 080.58630 37602 26 080 190 - Mid-Tex Gas Division Addition 080.58634 37602 31 080 190 - Mid-Tex Gas Division Addition 080.58634 38000 13 080 190 - Mid-Tex Gas Division Addition 080.58635 37602 22 080 190 - Mid-Tex Gas Division Addition 080.58635 38000 4 080 190 - Mid-Tex Gas Division Addition 080.58639 37602 685 080 190 - Mid-Tex Gas Division Addition 080.58639 38000 121 080 190 - Mid-Tex Gas Division Addition 080.58640 37602 121 080 190 - Mid-Tex Gas Division Addition 080.58640 38000 81 080 190 - Mid-Tex Gas Division Addition 080.58646 37602 3 080 190 - Mid-Tex Gas Division Addition 080.58646 38000 1 080 190 - Mid-Tex Gas Division Addition 080.58658 37602 5,102 080 190 - Mid-Tex Gas Division Addition 080.58658 38000 269 080 190 - Mid-Tex Gas Division Addition 080.58669 37602 4 080 190 - Mid-Tex Gas Division Addition 080.58670 37602 13 080 190 - Mid-Tex Gas Division Addition 080.58670 38000 1 080 190 - Mid-Tex Gas Division Addition 080.58684 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.58691 37602 91 080 190 - Mid-Tex Gas Division Addition 080.58691 38000 5 080 190 - Mid-Tex Gas Division Addition 080.58692 37602 16,370 080 190 - Mid-Tex Gas Division Addition 080.58692 38000 862 080 190 - Mid-Tex Gas Division Addition 080.58693 37602 2 080 190 - Mid-Tex Gas Division Addition 080.58693 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58694 37602 4 080 190 - Mid-Tex Gas Division Addition 080.58708 37602 72 080 190 - Mid-Tex Gas Division Addition 080.58708 38000 31 080 190 - Mid-Tex Gas Division Addition 080.58712 37602 36 080 190 - Mid-Tex Gas Division Addition 080.58712 38000 9 080 190 - Mid-Tex Gas Division Addition 080.58713 37602 0 080 190 - Mid-Tex Gas Division Addition 080.58714 37602 3 080 190 - Mid-Tex Gas Division Addition 080.58723 37602 5 080 190 - Mid-Tex Gas Division Addition 080.58726 37602 520 080 190 - Mid-Tex Gas Division Addition 080.58733 37602 5 080 190 - Mid-Tex Gas Division Addition 080.58733 38000 1 080 190 - Mid-Tex Gas Division Addition 080.58734 37602 77 080 190 - Mid-Tex Gas Division Addition 080.58734 38000 28 080 190 - Mid-Tex Gas Division Addition 080.58735 37602 23 080 190 - Mid-Tex Gas Division Addition 080.58735 38000 3 080 190 - Mid-Tex Gas Division Addition 080.58737 37601 0 080 190 - Mid-Tex Gas Division Addition 080.58738 37602 17 080 190 - Mid-Tex Gas Division Addition 080.58738 38000 1 080 190 - Mid-Tex Gas Division Addition 080.58740 37602 7,010 080 190 - Mid-Tex Gas Division Addition 080.58747 39906 - 080 190 - Mid-Tex Gas Division Addition 080.58748 38000 63 080 190 - Mid-Tex Gas Division Addition 080.58750 37602 76 080 190 - Mid-Tex Gas Division Addition 080.58750 38000 6 080 190 - Mid-Tex Gas Division Addition 080.58751 37602 86 080 190 - Mid-Tex Gas Division Addition 080.58753 37602 8,163 080 190 - Mid-Tex Gas Division Addition 080.58753 38000 907 080 190 - Mid-Tex Gas Division Addition 080.58755 37602 60 080 190 - Mid-Tex Gas Division Addition 080.58756 37602 103 080 190 - Mid-Tex Gas Division Addition 080.58756 38000 17 080 190 - Mid-Tex Gas Division Addition 080.58788 37602 981 080 190 - Mid-Tex Gas Division Addition 080.58788 38000 327 080 190 - Mid-Tex Gas Division Addition 080.58791 37602 2,520 080 190 - Mid-Tex Gas Division Addition 080.58791 38000 634 080 190 - Mid-Tex Gas Division Addition 080.58792 37602 (146) 080 190 - Mid-Tex Gas Division Addition 080.58792 38000 (17) 080 190 - Mid-Tex Gas Division Addition 080.58796 38000 13 080 190 - Mid-Tex Gas Division Addition 080.58797 37602 80 080 190 - Mid-Tex Gas Division Addition 080.58797 38000 9 080 190 - Mid-Tex Gas Division Addition 080.58798 37602 20 080 190 - Mid-Tex Gas Division Addition 080.58798 38000 1 080 190 - Mid-Tex Gas Division Addition 080.58800 37602 19,854 080 190 - Mid-Tex Gas Division Addition 080.58800 38000 10,680 080 190 - Mid-Tex Gas Division Addition 080.58801 37602 26 080 190 - Mid-Tex Gas Division Addition 080.58801 38000 1 080 190 - Mid-Tex Gas Division Addition 080.58806 37602 497 080 190 - Mid-Tex Gas Division Addition 080.58807 38000 3,886 080 190 - Mid-Tex Gas Division Addition 080.58815 37602 3,093 080 190 - Mid-Tex Gas Division Addition 080.58816 37602 2,062 080 190 - Mid-Tex Gas Division Addition 080.58817 37602 2,268 080 190 - Mid-Tex Gas Division Addition 080.58824 37602 15 080 190 - Mid-Tex Gas Division Addition 080.58824 38000 7 080 190 - Mid-Tex Gas Division Addition 080.58830 37601 115 080 190 - Mid-Tex Gas Division Addition 080.58830 37602 29 080 190 - Mid-Tex Gas Division Addition 080.58831 37602 59 080 190 - Mid-Tex Gas Division Addition 080.58831 38000 15 080 190 - Mid-Tex Gas Division Addition 080.58834 37602 21,998 080 190 - Mid-Tex Gas Division Addition 080.58834 38000 5,500 080 190 - Mid-Tex Gas Division Addition 080.58837 37602 6,028 080 190 - Mid-Tex Gas Division Addition 080.58837 38000 2,583 080 190 - Mid-Tex Gas Division Addition 080.58849 37602 0 080 190 - Mid-Tex Gas Division Addition 080.58860 37602 13 080 190 - Mid-Tex Gas Division Addition 080.58860 38000 2 080 190 - Mid-Tex Gas Division Addition 080.58863 37602 81 080 190 - Mid-Tex Gas Division Addition 080.58866 37602 269 080 190 - Mid-Tex Gas Division Addition 080.58866 38000 133 080 190 - Mid-Tex Gas Division Addition 080.58867 37602 63 080 190 - Mid-Tex Gas Division Addition 080.58867 38000 3 080 190 - Mid-Tex Gas Division Addition 080.58871 37602 440 080 190 - Mid-Tex Gas Division Addition 080.58871 38000 23 080 190 - Mid-Tex Gas Division Addition 080.58872 37602 6,377 080 190 - Mid-Tex Gas Division Addition 080.58872 38000 708 080 190 - Mid-Tex Gas Division Addition 080.58878 37602 28 080 190 - Mid-Tex Gas Division Addition 080.58878 38000 8 080 190 - Mid-Tex Gas Division Addition 080.58879 37601 138 080 190 - Mid-Tex Gas Division Addition 080.58879 38000 15 080 190 - Mid-Tex Gas Division Addition 080.58880 37602 32 080 190 - Mid-Tex Gas Division Addition 080.58880 38000 7 080 190 - Mid-Tex Gas Division Addition 080.58881 37602 667 080 190 - Mid-Tex Gas Division Addition 080.58881 38000 118 MTX Additions by FERC Page 21 of 101 419 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.58882 37602 187 080 190 - Mid-Tex Gas Division Addition 080.58882 38000 10 080 190 - Mid-Tex Gas Division Addition 080.58883 37602 234 080 190 - Mid-Tex Gas Division Addition 080.58883 38000 12 080 190 - Mid-Tex Gas Division Addition 080.58888 37602 31 080 190 - Mid-Tex Gas Division Addition 080.58888 38000 21 080 190 - Mid-Tex Gas Division Addition 080.58890 37602 129 080 190 - Mid-Tex Gas Division Addition 080.58890 38000 14 080 190 - Mid-Tex Gas Division Addition 080.58891 37602 20 080 190 - Mid-Tex Gas Division Addition 080.58891 38000 19 080 190 - Mid-Tex Gas Division Addition 080.58895 37602 0 080 190 - Mid-Tex Gas Division Addition 080.58895 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58896 37601 2 080 190 - Mid-Tex Gas Division Addition 080.58896 38000 0 080 190 - Mid-Tex Gas Division Addition 080.58899 37602 31 080 190 - Mid-Tex Gas Division Addition 080.58899 38000 3 080 190 - Mid-Tex Gas Division Addition 080.58900 37602 35 080 190 - Mid-Tex Gas Division Addition 080.58900 38000 23 080 190 - Mid-Tex Gas Division Addition 080.58901 37602 18 080 190 - Mid-Tex Gas Division Addition 080.58901 38000 12 080 190 - Mid-Tex Gas Division Addition 080.58903 37602 69 080 190 - Mid-Tex Gas Division Addition 080.58903 38000 8 080 190 - Mid-Tex Gas Division Addition 080.58907 37602 299 080 190 - Mid-Tex Gas Division Addition 080.58907 38000 33 080 190 - Mid-Tex Gas Division Addition 080.58911 37602 7 080 190 - Mid-Tex Gas Division Addition 080.58921 37602 29 080 190 - Mid-Tex Gas Division Addition 080.58921 38000 2 080 190 - Mid-Tex Gas Division Addition 080.58928 37602 40 080 190 - Mid-Tex Gas Division Addition 080.58928 38000 40 080 190 - Mid-Tex Gas Division Addition 080.58929 37602 4,657 080 190 - Mid-Tex Gas Division Addition 080.58929 38000 1,164 080 190 - Mid-Tex Gas Division Addition 080.58942 37602 63 080 190 - Mid-Tex Gas Division Addition 080.58942 38000 35 080 190 - Mid-Tex Gas Division Addition 080.58945 37602 34 080 190 - Mid-Tex Gas Division Addition 080.58945 38000 22 080 190 - Mid-Tex Gas Division Addition 080.58946 37602 28 080 190 - Mid-Tex Gas Division Addition 080.58946 38000 15 080 190 - Mid-Tex Gas Division Addition 080.58951 37602 1,180 080 190 - Mid-Tex Gas Division Addition 080.58951 38000 432 080 190 - Mid-Tex Gas Division Addition 080.58952 37602 6 080 190 - Mid-Tex Gas Division Addition 080.58961 37602 530 080 190 - Mid-Tex Gas Division Addition 080.58961 38000 94 080 190 - Mid-Tex Gas Division Addition 080.58965 37602 33 080 190 - Mid-Tex Gas Division Addition 080.58965 38000 22 080 190 - Mid-Tex Gas Division Addition 080.58969 37602 522 080 190 - Mid-Tex Gas Division Addition 080.58969 38000 29 080 190 - Mid-Tex Gas Division Addition 080.58970 37602 36 080 190 - Mid-Tex Gas Division Addition 080.58970 38000 67 080 190 - Mid-Tex Gas Division Addition 080.58974 38000 97 080 190 - Mid-Tex Gas Division Addition 080.58976 37602 50 080 190 - Mid-Tex Gas Division Addition 080.58976 38000 6 080 190 - Mid-Tex Gas Division Addition 080.58978 37602 10 080 190 - Mid-Tex Gas Division Addition 080.58978 38000 1 080 190 - Mid-Tex Gas Division Addition 080.58980 37602 145 080 190 - Mid-Tex Gas Division Addition 080.58980 38000 109 080 190 - Mid-Tex Gas Division Addition 080.58982 37602 15 080 190 - Mid-Tex Gas Division Addition 080.58991 37602 1 080 190 - Mid-Tex Gas Division Addition 080.58999 37602 863 080 190 - Mid-Tex Gas Division Addition 080.58999 38000 346 080 190 - Mid-Tex Gas Division Addition 080.59003 37602 1 080 190 - Mid-Tex Gas Division Addition 080.59003 38000 0 080 190 - Mid-Tex Gas Division Addition 080.59007 37602 31 080 190 - Mid-Tex Gas Division Addition 080.59007 38000 16 080 190 - Mid-Tex Gas Division Addition 080.59008 37602 46 080 190 - Mid-Tex Gas Division Addition 080.59008 38000 5 080 190 - Mid-Tex Gas Division Addition 080.59014 37602 29 080 190 - Mid-Tex Gas Division Addition 080.59014 38000 12 080 190 - Mid-Tex Gas Division Addition 080.59016 37602 24 080 190 - Mid-Tex Gas Division Addition 080.59016 38000 23 080 190 - Mid-Tex Gas Division Addition 080.59020 37602 6,228 080 190 - Mid-Tex Gas Division Addition 080.59020 38000 328 080 190 - Mid-Tex Gas Division Addition 080.59021 38000 113 080 190 - Mid-Tex Gas Division Addition 080.59031 37602 113 080 190 - Mid-Tex Gas Division Addition 080.59031 38000 6 080 190 - Mid-Tex Gas Division Addition 080.59039 37800 2 080 190 - Mid-Tex Gas Division Addition 080.59050 37602 21 080 190 - Mid-Tex Gas Division Addition 080.59051 37602 125 080 190 - Mid-Tex Gas Division Addition 080.59051 38000 125 080 190 - Mid-Tex Gas Division Addition 080.59052 37602 12 080 190 - Mid-Tex Gas Division Addition 080.59054 37602 8 080 190 - Mid-Tex Gas Division Addition 080.59054 38000 1 080 190 - Mid-Tex Gas Division Addition 080.59055 37602 34 080 190 - Mid-Tex Gas Division Addition 080.59060 37602 153 080 190 - Mid-Tex Gas Division Addition 080.59060 38000 38 080 190 - Mid-Tex Gas Division Addition 080.59062 37602 41,449 080 190 - Mid-Tex Gas Division Addition 080.59062 38000 4,622 080 190 - Mid-Tex Gas Division Addition 080.59064 37602 102 080 190 - Mid-Tex Gas Division Addition 080.59064 38000 31 080 190 - Mid-Tex Gas Division Addition 080.59068 37602 295 080 190 - Mid-Tex Gas Division Addition 080.59068 38000 126 080 190 - Mid-Tex Gas Division Addition 080.59069 37602 57 080 190 - Mid-Tex Gas Division Addition 080.59069 38000 50 080 190 - Mid-Tex Gas Division Addition 080.59070 37602 2 080 190 - Mid-Tex Gas Division Addition 080.59074 37602 20 080 190 - Mid-Tex Gas Division Addition 080.59074 38000 13 080 190 - Mid-Tex Gas Division Addition 080.59075 37602 29 080 190 - Mid-Tex Gas Division Addition 080.59075 38000 20 080 190 - Mid-Tex Gas Division Addition 080.59078 37602 104 080 190 - Mid-Tex Gas Division Addition 080.59090 37602 18 080 190 - Mid-Tex Gas Division Addition 080.59093 37602 2 080 190 - Mid-Tex Gas Division Addition 080.59100 37602 9 080 190 - Mid-Tex Gas Division Addition 080.59117 37602 299 080 190 - Mid-Tex Gas Division Addition 080.59117 38000 3 080 190 - Mid-Tex Gas Division Addition 080.59124 37602 2,165 080 190 - Mid-Tex Gas Division Addition 080.59132 38000 112 080 190 - Mid-Tex Gas Division Addition 080.59135 37601 10,074 080 190 - Mid-Tex Gas Division Addition 080.59140 37800 2 MTX Additions by FERC Page 22 of 101 420 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.59142 37601 386,164 080 190 - Mid-Tex Gas Division Addition 080.59144 37602 7 080 190 - Mid-Tex Gas Division Addition 080.59153 37602 37 080 190 - Mid-Tex Gas Division Addition 080.59153 38000 11 080 190 - Mid-Tex Gas Division Addition 080.59157 37602 28 080 190 - Mid-Tex Gas Division Addition 080.59157 38000 20 080 190 - Mid-Tex Gas Division Addition 080.59162 38000 4 080 190 - Mid-Tex Gas Division Addition 080.59165 37601 322 080 190 - Mid-Tex Gas Division Addition 080.59167 37602 22 080 190 - Mid-Tex Gas Division Addition 080.59172 37602 23 080 190 - Mid-Tex Gas Division Addition 080.59172 38000 3 080 190 - Mid-Tex Gas Division Addition 080.59173 37602 26 080 190 - Mid-Tex Gas Division Addition 080.59173 38000 4 080 190 - Mid-Tex Gas Division Addition 080.59175 37602 28 080 190 - Mid-Tex Gas Division Addition 080.59175 38000 0 080 190 - Mid-Tex Gas Division Addition 080.59176 37602 19 080 190 - Mid-Tex Gas Division Addition 080.59199 38000 71 080 190 - Mid-Tex Gas Division Addition 080.59202 37602 68 080 190 - Mid-Tex Gas Division Addition 080.59202 38000 19 080 190 - Mid-Tex Gas Division Addition 080.59214 37602 91 080 190 - Mid-Tex Gas Division Addition 080.59214 38000 14 080 190 - Mid-Tex Gas Division Addition 080.59215 37602 4 080 190 - Mid-Tex Gas Division Addition 080.59216 37602 626 080 190 - Mid-Tex Gas Division Addition 080.59216 38000 86 080 190 - Mid-Tex Gas Division Addition 080.59221 37602 40 080 190 - Mid-Tex Gas Division Addition 080.59221 38000 10 080 190 - Mid-Tex Gas Division Addition 080.59261 37602 43 080 190 - Mid-Tex Gas Division Addition 080.59261 38000 16 080 190 - Mid-Tex Gas Division Addition 080.59268 37602 35 080 190 - Mid-Tex Gas Division Addition 080.59268 38000 10 080 190 - Mid-Tex Gas Division Addition 080.59269 37600 38 080 190 - Mid-Tex Gas Division Addition 080.59272 37602 125 080 190 - Mid-Tex Gas Division Addition 080.59272 38000 10 080 190 - Mid-Tex Gas Division Addition 080.59274 38000 2 080 190 - Mid-Tex Gas Division Addition 080.59277 37602 19 080 190 - Mid-Tex Gas Division Addition 080.59288 37602 132 080 190 - Mid-Tex Gas Division Addition 080.59288 38000 3 080 190 - Mid-Tex Gas Division Addition 080.59292 37602 49 080 190 - Mid-Tex Gas Division Addition 080.59292 38000 5 080 190 - Mid-Tex Gas Division Addition 080.59293 37602 136 080 190 - Mid-Tex Gas Division Addition 080.59307 37602 30 080 190 - Mid-Tex Gas Division Addition 080.59309 38000 135 080 190 - Mid-Tex Gas Division Addition 080.59330 37602 17,908 080 190 - Mid-Tex Gas Division Addition 080.59330 38000 1,990 080 190 - Mid-Tex Gas Division Addition 080.59331 37602 3,425 080 190 - Mid-Tex Gas Division Addition 080.59332 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.59335 37602 1 080 190 - Mid-Tex Gas Division Addition 080.59337 37602 21 080 190 - Mid-Tex Gas Division Addition 080.59337 38000 2 080 190 - Mid-Tex Gas Division Addition 080.59339 37602 92 080 190 - Mid-Tex Gas Division Addition 080.59339 38000 31 080 190 - Mid-Tex Gas Division Addition 080.59340 37602 42 080 190 - Mid-Tex Gas Division Addition 080.59340 38000 11 080 190 - Mid-Tex Gas Division Addition 080.59342 37602 112 080 190 - Mid-Tex Gas Division Addition 080.59342 38000 53 080 190 - Mid-Tex Gas Division Addition 080.59344 37602 103 080 190 - Mid-Tex Gas Division Addition 080.59345 37602 208 080 190 - Mid-Tex Gas Division Addition 080.59345 38000 166 080 190 - Mid-Tex Gas Division Addition 080.59346 37602 199 080 190 - Mid-Tex Gas Division Addition 080.59346 38000 133 080 190 - Mid-Tex Gas Division Addition 080.59347 37602 30 080 190 - Mid-Tex Gas Division Addition 080.59347 38000 15 080 190 - Mid-Tex Gas Division Addition 080.59348 37602 3,660 080 190 - Mid-Tex Gas Division Addition 080.59348 38000 2,340 080 190 - Mid-Tex Gas Division Addition 080.59350 37602 985 080 190 - Mid-Tex Gas Division Addition 080.59350 38000 362 080 190 - Mid-Tex Gas Division Addition 080.59360 37602 7 080 190 - Mid-Tex Gas Division Addition 080.59365 37602 42 080 190 - Mid-Tex Gas Division Addition 080.59365 38000 1 080 190 - Mid-Tex Gas Division Addition 080.59369 38000 77 080 190 - Mid-Tex Gas Division Addition 080.59372 37602 62 080 190 - Mid-Tex Gas Division Addition 080.59372 38000 7 080 190 - Mid-Tex Gas Division Addition 080.59377 37602 24 080 190 - Mid-Tex Gas Division Addition 080.59377 38000 2 080 190 - Mid-Tex Gas Division Addition 080.59378 37601 65 080 190 - Mid-Tex Gas Division Addition 080.59381 37602 17 080 190 - Mid-Tex Gas Division Addition 080.59381 38000 9 080 190 - Mid-Tex Gas Division Addition 080.59387 37602 4 080 190 - Mid-Tex Gas Division Addition 080.59387 38000 1 080 190 - Mid-Tex Gas Division Addition 080.59402 37602 46 080 190 - Mid-Tex Gas Division Addition 080.59402 38000 2 080 190 - Mid-Tex Gas Division Addition 080.59408 37602 27 080 190 - Mid-Tex Gas Division Addition 080.59408 38000 5 080 190 - Mid-Tex Gas Division Addition 080.59409 37602 38 080 190 - Mid-Tex Gas Division Addition 080.59409 38000 7 080 190 - Mid-Tex Gas Division Addition 080.59411 37602 1 080 190 - Mid-Tex Gas Division Addition 080.59411 38000 0 080 190 - Mid-Tex Gas Division Addition 080.59414 37602 47 080 190 - Mid-Tex Gas Division Addition 080.59414 38000 5 080 190 - Mid-Tex Gas Division Addition 080.59416 37602 75 080 190 - Mid-Tex Gas Division Addition 080.59416 38000 8 080 190 - Mid-Tex Gas Division Addition 080.59427 37602 45 080 190 - Mid-Tex Gas Division Addition 080.59427 38000 15 080 190 - Mid-Tex Gas Division Addition 080.59430 37800 7 080 190 - Mid-Tex Gas Division Addition 080.59432 37602 70 080 190 - Mid-Tex Gas Division Addition 080.59432 38000 16 080 190 - Mid-Tex Gas Division Addition 080.59445 37602 39 080 190 - Mid-Tex Gas Division Addition 080.59445 38000 2 080 190 - Mid-Tex Gas Division Addition 080.59454 37602 26 080 190 - Mid-Tex Gas Division Addition 080.59454 38000 11 080 190 - Mid-Tex Gas Division Addition 080.59463 37602 37 080 190 - Mid-Tex Gas Division Addition 080.59463 38000 9 080 190 - Mid-Tex Gas Division Addition 080.59468 37602 47 080 190 - Mid-Tex Gas Division Addition 080.59468 38000 20 080 190 - Mid-Tex Gas Division Addition 080.59469 37602 52 080 190 - Mid-Tex Gas Division Addition 080.59469 38000 35 080 190 - Mid-Tex Gas Division Addition 080.59470 37602 194 MTX Additions by FERC Page 23 of 101 421 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.59470 38000 83 080 190 - Mid-Tex Gas Division Addition 080.59473 37800 0 080 190 - Mid-Tex Gas Division Addition 080.59477 37602 9 080 190 - Mid-Tex Gas Division Addition 080.59477 38000 1 080 190 - Mid-Tex Gas Division Addition 080.59482 37602 8 080 190 - Mid-Tex Gas Division Addition 080.59482 38000 0 080 190 - Mid-Tex Gas Division Addition 080.59488 37602 5 080 190 - Mid-Tex Gas Division Addition 080.59488 38000 2 080 190 - Mid-Tex Gas Division Addition 080.59496 37602 356 080 190 - Mid-Tex Gas Division Addition 080.59496 38000 89 080 190 - Mid-Tex Gas Division Addition 080.59497 37602 21 080 190 - Mid-Tex Gas Division Addition 080.59497 38000 2 080 190 - Mid-Tex Gas Division Addition 080.59530 37602 154 080 190 - Mid-Tex Gas Division Addition 080.59530 38000 126 080 190 - Mid-Tex Gas Division Addition 080.59533 37602 (243) 080 190 - Mid-Tex Gas Division Addition 080.59533 38000 (109) 080 190 - Mid-Tex Gas Division Addition 080.59534 37602 21 080 190 - Mid-Tex Gas Division Addition 080.59534 38000 9 080 190 - Mid-Tex Gas Division Addition 080.59535 37602 9 080 190 - Mid-Tex Gas Division Addition 080.59535 38000 10 080 190 - Mid-Tex Gas Division Addition 080.59539 37602 45 080 190 - Mid-Tex Gas Division Addition 080.59539 38000 15 080 190 - Mid-Tex Gas Division Addition 080.59541 37602 62 080 190 - Mid-Tex Gas Division Addition 080.59541 38000 3 080 190 - Mid-Tex Gas Division Addition 080.59546 37601 102 080 190 - Mid-Tex Gas Division Addition 080.59546 38000 5 080 190 - Mid-Tex Gas Division Addition 080.59548 37602 12 080 190 - Mid-Tex Gas Division Addition 080.59548 38000 2 080 190 - Mid-Tex Gas Division Addition 080.59553 37602 56 080 190 - Mid-Tex Gas Division Addition 080.59553 38000 6 080 190 - Mid-Tex Gas Division Addition 080.59559 37602 70 080 190 - Mid-Tex Gas Division Addition 080.59559 38000 8 080 190 - Mid-Tex Gas Division Addition 080.59580 37602 40 080 190 - Mid-Tex Gas Division Addition 080.59580 38000 7 080 190 - Mid-Tex Gas Division Addition 080.59590 37602 32 080 190 - Mid-Tex Gas Division Addition 080.59590 38000 4 080 190 - Mid-Tex Gas Division Addition 080.59600 37602 47 080 190 - Mid-Tex Gas Division Addition 080.59600 38000 8 080 190 - Mid-Tex Gas Division Addition 080.59601 37602 152 080 190 - Mid-Tex Gas Division Addition 080.59601 38000 17 080 190 - Mid-Tex Gas Division Addition 080.59603 37602 188 080 190 - Mid-Tex Gas Division Addition 080.59603 38000 90 080 190 - Mid-Tex Gas Division Addition 080.59606 37602 13 080 190 - Mid-Tex Gas Division Addition 080.59611 37800 28 080 190 - Mid-Tex Gas Division Addition 080.59612 37602 209 080 190 - Mid-Tex Gas Division Addition 080.59612 38000 21 080 190 - Mid-Tex Gas Division Addition 080.59620 37602 (147) 080 190 - Mid-Tex Gas Division Addition 080.59620 38000 (8) 080 190 - Mid-Tex Gas Division Addition 080.59625 37602 319 080 190 - Mid-Tex Gas Division Addition 080.59625 38000 7 080 190 - Mid-Tex Gas Division Addition 080.59627 37602 6,492 080 190 - Mid-Tex Gas Division Addition 080.59637 37602 214 080 190 - Mid-Tex Gas Division Addition 080.59637 38000 71 080 190 - Mid-Tex Gas Division Addition 080.59639 37602 67 080 190 - Mid-Tex Gas Division Addition 080.59639 38000 21 080 190 - Mid-Tex Gas Division Addition 080.59640 37602 418 080 190 - Mid-Tex Gas Division Addition 080.59640 38000 197 080 190 - Mid-Tex Gas Division Addition 080.59642 37602 8 080 190 - Mid-Tex Gas Division Addition 080.59643 37602 71 080 190 - Mid-Tex Gas Division Addition 080.59643 38000 24 080 190 - Mid-Tex Gas Division Addition 080.59644 37602 33 080 190 - Mid-Tex Gas Division Addition 080.59644 38000 5 080 190 - Mid-Tex Gas Division Addition 080.59645 37602 12 080 190 - Mid-Tex Gas Division Addition 080.59649 37602 102,853 080 190 - Mid-Tex Gas Division Addition 080.59649 38000 5,404 080 190 - Mid-Tex Gas Division Addition 080.59660 37602 (184) 080 190 - Mid-Tex Gas Division Addition 080.59660 38000 (65) 080 190 - Mid-Tex Gas Division Addition 080.59666 37602 61 080 190 - Mid-Tex Gas Division Addition 080.59666 38000 7 080 190 - Mid-Tex Gas Division Addition 080.59672 37602 7 080 190 - Mid-Tex Gas Division Addition 080.59672 38000 0 080 190 - Mid-Tex Gas Division Addition 080.59675 37602 49 080 190 - Mid-Tex Gas Division Addition 080.59675 38000 3 080 190 - Mid-Tex Gas Division Addition 080.59678 37602 2,338 080 190 - Mid-Tex Gas Division Addition 080.59678 38000 585 080 190 - Mid-Tex Gas Division Addition 080.59679 37602 8 080 190 - Mid-Tex Gas Division Addition 080.59679 38000 0 080 190 - Mid-Tex Gas Division Addition 080.59681 37602 68 080 190 - Mid-Tex Gas Division Addition 080.59683 38000 7 080 190 - Mid-Tex Gas Division Addition 080.59688 37602 280 080 190 - Mid-Tex Gas Division Addition 080.59688 38000 97 080 190 - Mid-Tex Gas Division Addition 080.59691 37602 20 080 190 - Mid-Tex Gas Division Addition 080.59697 37602 31 080 190 - Mid-Tex Gas Division Addition 080.59697 38000 1 080 190 - Mid-Tex Gas Division Addition 080.59700 38000 35 080 190 - Mid-Tex Gas Division Addition 080.59702 37602 185 080 190 - Mid-Tex Gas Division Addition 080.59702 38000 46 080 190 - Mid-Tex Gas Division Addition 080.59705 37602 7 080 190 - Mid-Tex Gas Division Addition 080.59713 37900 4 080 190 - Mid-Tex Gas Division Addition 080.59724 37602 515 080 190 - Mid-Tex Gas Division Addition 080.59726 37602 73 080 190 - Mid-Tex Gas Division Addition 080.59726 38000 5 080 190 - Mid-Tex Gas Division Addition 080.59728 37602 11 080 190 - Mid-Tex Gas Division Addition 080.59729 37602 59 080 190 - Mid-Tex Gas Division Addition 080.59729 38000 10 080 190 - Mid-Tex Gas Division Addition 080.59733 37602 7 080 190 - Mid-Tex Gas Division Addition 080.59738 37602 40 080 190 - Mid-Tex Gas Division Addition 080.59741 37602 43 080 190 - Mid-Tex Gas Division Addition 080.59741 38000 15 080 190 - Mid-Tex Gas Division Addition 080.59745 37602 241 080 190 - Mid-Tex Gas Division Addition 080.59745 38000 68 080 190 - Mid-Tex Gas Division Addition 080.59746 37602 3,864 080 190 - Mid-Tex Gas Division Addition 080.59746 38000 2,081 080 190 - Mid-Tex Gas Division Addition 080.59747 37602 428 080 190 - Mid-Tex Gas Division Addition 080.59747 38000 241 080 190 - Mid-Tex Gas Division Addition 080.59753 37602 64 080 190 - Mid-Tex Gas Division Addition 080.59753 38000 20 MTX Additions by FERC Page 24 of 101 422 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.59775 37602 307 080 190 - Mid-Tex Gas Division Addition 080.59775 38000 14 080 190 - Mid-Tex Gas Division Addition 080.59784 37900 263 080 190 - Mid-Tex Gas Division Addition 080.59818 38000 4 080 190 - Mid-Tex Gas Division Addition 080.59823 37800 17 080 190 - Mid-Tex Gas Division Addition 080.59824 37602 34 080 190 - Mid-Tex Gas Division Addition 080.59824 38000 11 080 190 - Mid-Tex Gas Division Addition 080.59825 37602 39 080 190 - Mid-Tex Gas Division Addition 080.59825 38000 17 080 190 - Mid-Tex Gas Division Addition 080.59827 37602 89 080 190 - Mid-Tex Gas Division Addition 080.59830 37602 191 080 190 - Mid-Tex Gas Division Addition 080.59830 38000 82 080 190 - Mid-Tex Gas Division Addition 080.59836 37602 6 080 190 - Mid-Tex Gas Division Addition 080.59836 38000 1 080 190 - Mid-Tex Gas Division Addition 080.59845 37602 75 080 190 - Mid-Tex Gas Division Addition 080.59845 38000 17 080 190 - Mid-Tex Gas Division Addition 080.59854 37602 57 080 190 - Mid-Tex Gas Division Addition 080.59854 38000 10 080 190 - Mid-Tex Gas Division Addition 080.59857 37600 1 080 190 - Mid-Tex Gas Division Addition 080.59879 37602 130 080 190 - Mid-Tex Gas Division Addition 080.59879 38000 106 080 190 - Mid-Tex Gas Division Addition 080.59881 37602 21 080 190 - Mid-Tex Gas Division Addition 080.59881 38000 4 080 190 - Mid-Tex Gas Division Addition 080.59882 37602 105 080 190 - Mid-Tex Gas Division Addition 080.59882 38000 12 080 190 - Mid-Tex Gas Division Addition 080.59886 37602 3,531 080 190 - Mid-Tex Gas Division Addition 080.59886 38000 225 080 190 - Mid-Tex Gas Division Addition 080.59889 37602 1,876 080 190 - Mid-Tex Gas Division Addition 080.59889 38000 385 080 190 - Mid-Tex Gas Division Addition 080.59889 38100 (41) 080 190 - Mid-Tex Gas Division Addition 080.59889 38200 (2) 080 190 - Mid-Tex Gas Division Addition 080.59889 38300 (9) 080 190 - Mid-Tex Gas Division Addition 080.59893 37602 319 080 190 - Mid-Tex Gas Division Addition 080.59893 38000 32 080 190 - Mid-Tex Gas Division Addition 080.59894 37602 10 080 190 - Mid-Tex Gas Division Addition 080.59905 37602 664 080 190 - Mid-Tex Gas Division Addition 080.59905 38000 35 080 190 - Mid-Tex Gas Division Addition 080.59907 37602 33 080 190 - Mid-Tex Gas Division Addition 080.59907 38000 11 080 190 - Mid-Tex Gas Division Addition 080.59909 37602 21 080 190 - Mid-Tex Gas Division Addition 080.59912 37602 13 080 190 - Mid-Tex Gas Division Addition 080.59939 37602 (416) 080 190 - Mid-Tex Gas Division Addition 080.59939 38000 (64) 080 190 - Mid-Tex Gas Division Addition 080.59943 37601 44,317 080 190 - Mid-Tex Gas Division Addition 080.59943 37602 3,545 080 190 - Mid-Tex Gas Division Addition 080.59943 37800 33,565 080 190 - Mid-Tex Gas Division Addition 080.59946 37602 127 080 190 - Mid-Tex Gas Division Addition 080.59946 38000 14 080 190 - Mid-Tex Gas Division Addition 080.59947 37602 85 080 190 - Mid-Tex Gas Division Addition 080.59947 38000 21 080 190 - Mid-Tex Gas Division Addition 080.59948 37602 93 080 190 - Mid-Tex Gas Division Addition 080.59948 38000 12 080 190 - Mid-Tex Gas Division Addition 080.59956 37602 9 080 190 - Mid-Tex Gas Division Addition 080.59970 37602 15 080 190 - Mid-Tex Gas Division Addition 080.59971 37602 568 080 190 - Mid-Tex Gas Division Addition 080.59971 38000 30 080 190 - Mid-Tex Gas Division Addition 080.59994 37602 5 080 190 - Mid-Tex Gas Division Addition 080.59994 38000 1 080 190 - Mid-Tex Gas Division Addition 080.60006 37602 3 080 190 - Mid-Tex Gas Division Addition 080.60022 37602 19 080 190 - Mid-Tex Gas Division Addition 080.60022 38000 2 080 190 - Mid-Tex Gas Division Addition 080.60047 37602 189 080 190 - Mid-Tex Gas Division Addition 080.60047 38000 4 080 190 - Mid-Tex Gas Division Addition 080.60048 37602 109 080 190 - Mid-Tex Gas Division Addition 080.60048 38000 59 080 190 - Mid-Tex Gas Division Addition 080.60050 37602 240 080 190 - Mid-Tex Gas Division Addition 080.60050 38000 7 080 190 - Mid-Tex Gas Division Addition 080.60063 37602 60 080 190 - Mid-Tex Gas Division Addition 080.60063 38000 4 080 190 - Mid-Tex Gas Division Addition 080.60077 37602 36 080 190 - Mid-Tex Gas Division Addition 080.60077 38000 9 080 190 - Mid-Tex Gas Division Addition 080.60079 37602 47 080 190 - Mid-Tex Gas Division Addition 080.60079 38000 13 080 190 - Mid-Tex Gas Division Addition 080.60080 37601 437,233 080 190 - Mid-Tex Gas Division Addition 080.60080 37602 2,855 080 190 - Mid-Tex Gas Division Addition 080.60080 37800 6,068 080 190 - Mid-Tex Gas Division Addition 080.60083 37600 1 080 190 - Mid-Tex Gas Division Addition 080.60087 37602 42 080 190 - Mid-Tex Gas Division Addition 080.60087 38000 28 080 190 - Mid-Tex Gas Division Addition 080.60088 37602 8 080 190 - Mid-Tex Gas Division Addition 080.60091 37602 98 080 190 - Mid-Tex Gas Division Addition 080.60091 38000 24 080 190 - Mid-Tex Gas Division Addition 080.60094 37602 696 080 190 - Mid-Tex Gas Division Addition 080.60094 38000 113 080 190 - Mid-Tex Gas Division Addition 080.60100 37602 163 080 190 - Mid-Tex Gas Division Addition 080.60100 38000 9 080 190 - Mid-Tex Gas Division Addition 080.60103 37602 292 080 190 - Mid-Tex Gas Division Addition 080.60103 38000 12 080 190 - Mid-Tex Gas Division Addition 080.60104 37602 181 080 190 - Mid-Tex Gas Division Addition 080.60104 38000 77 080 190 - Mid-Tex Gas Division Addition 080.60105 37602 2,864 080 190 - Mid-Tex Gas Division Addition 080.60105 38000 716 080 190 - Mid-Tex Gas Division Addition 080.60106 37602 131 080 190 - Mid-Tex Gas Division Addition 080.60106 38000 1 080 190 - Mid-Tex Gas Division Addition 080.60107 37602 99 080 190 - Mid-Tex Gas Division Addition 080.60107 38000 3 080 190 - Mid-Tex Gas Division Addition 080.60108 37602 198 080 190 - Mid-Tex Gas Division Addition 080.60108 38000 6 080 190 - Mid-Tex Gas Division Addition 080.60110 37602 166 080 190 - Mid-Tex Gas Division Addition 080.60110 38000 3 080 190 - Mid-Tex Gas Division Addition 080.60111 37602 29,208 080 190 - Mid-Tex Gas Division Addition 080.60111 38000 3,245 080 190 - Mid-Tex Gas Division Addition 080.60112 37602 (1,804) 080 190 - Mid-Tex Gas Division Addition 080.60112 38000 (601) 080 190 - Mid-Tex Gas Division Addition 080.60113 37602 7,162 080 190 - Mid-Tex Gas Division Addition 080.60113 38000 1,790 080 190 - Mid-Tex Gas Division Addition 080.60114 37602 16,598 MTX Additions by FERC Page 25 of 101 423 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.60117 37602 58 080 190 - Mid-Tex Gas Division Addition 080.60117 38000 25 080 190 - Mid-Tex Gas Division Addition 080.60125 37800 85 080 190 - Mid-Tex Gas Division Addition 080.60126 37800 266 080 190 - Mid-Tex Gas Division Addition 080.60142 37602 24 080 190 - Mid-Tex Gas Division Addition 080.60143 37602 29 080 190 - Mid-Tex Gas Division Addition 080.60143 38000 2 080 190 - Mid-Tex Gas Division Addition 080.60145 37601 42,860 080 190 - Mid-Tex Gas Division Addition 080.60145 37800 3,785 080 190 - Mid-Tex Gas Division Addition 080.60146 37602 92 080 190 - Mid-Tex Gas Division Addition 080.60146 38000 5 080 190 - Mid-Tex Gas Division Addition 080.60150 37602 17 080 190 - Mid-Tex Gas Division Addition 080.60150 38000 5 080 190 - Mid-Tex Gas Division Addition 080.60157 37602 23 080 190 - Mid-Tex Gas Division Addition 080.60157 38000 1 080 190 - Mid-Tex Gas Division Addition 080.60158 37602 41 080 190 - Mid-Tex Gas Division Addition 080.60163 37602 42 080 190 - Mid-Tex Gas Division Addition 080.60163 38000 2 080 190 - Mid-Tex Gas Division Addition 080.60167 37602 83 080 190 - Mid-Tex Gas Division Addition 080.60167 38000 21 080 190 - Mid-Tex Gas Division Addition 080.60170 37602 8 080 190 - Mid-Tex Gas Division Addition 080.60170 37800 7 080 190 - Mid-Tex Gas Division Addition 080.60170 38000 1 080 190 - Mid-Tex Gas Division Addition 080.60171 37602 47 080 190 - Mid-Tex Gas Division Addition 080.60171 38000 12 080 190 - Mid-Tex Gas Division Addition 080.60172 37602 40 080 190 - Mid-Tex Gas Division Addition 080.60172 38000 13 080 190 - Mid-Tex Gas Division Addition 080.60173 37602 26 080 190 - Mid-Tex Gas Division Addition 080.60173 38000 1 080 190 - Mid-Tex Gas Division Addition 080.60178 37602 3 080 190 - Mid-Tex Gas Division Addition 080.60178 38000 3 080 190 - Mid-Tex Gas Division Addition 080.60182 37900 460 080 190 - Mid-Tex Gas Division Addition 080.60188 37602 24 080 190 - Mid-Tex Gas Division Addition 080.60191 37602 30 080 190 - Mid-Tex Gas Division Addition 080.60191 38000 1 080 190 - Mid-Tex Gas Division Addition 080.60200 37602 483 080 190 - Mid-Tex Gas Division Addition 080.60200 38000 10 080 190 - Mid-Tex Gas Division Addition 080.60201 37602 245 080 190 - Mid-Tex Gas Division Addition 080.60201 38000 27 080 190 - Mid-Tex Gas Division Addition 080.60202 37602 363 080 190 - Mid-Tex Gas Division Addition 080.60202 38000 15 080 190 - Mid-Tex Gas Division Addition 080.60204 37602 245 080 190 - Mid-Tex Gas Division Addition 080.60204 38000 8 080 190 - Mid-Tex Gas Division Addition 080.60217 37602 8 080 190 - Mid-Tex Gas Division Addition 080.60225 37602 50 080 190 - Mid-Tex Gas Division Addition 080.60248 37601 34 080 190 - Mid-Tex Gas Division Addition 080.60250 37602 70 080 190 - Mid-Tex Gas Division Addition 080.60250 38000 4 080 190 - Mid-Tex Gas Division Addition 080.60254 37602 148 080 190 - Mid-Tex Gas Division Addition 080.60254 38000 26 080 190 - Mid-Tex Gas Division Addition 080.60259 37602 31 080 190 - Mid-Tex Gas Division Addition 080.60279 37602 11 080 190 - Mid-Tex Gas Division Addition 080.60285 37602 59 080 190 - Mid-Tex Gas Division Addition 080.60285 38000 15 080 190 - Mid-Tex Gas Division Addition 080.60287 37602 68 080 190 - Mid-Tex Gas Division Addition 080.60287 38000 8 080 190 - Mid-Tex Gas Division Addition 080.60288 37602 15 080 190 - Mid-Tex Gas Division Addition 080.60294 37602 67 080 190 - Mid-Tex Gas Division Addition 080.60295 37601 34 080 190 - Mid-Tex Gas Division Addition 080.60299 37601 39 080 190 - Mid-Tex Gas Division Addition 080.60302 37800 2 080 190 - Mid-Tex Gas Division Addition 080.60317 37602 8,256 080 190 - Mid-Tex Gas Division Addition 080.60328 37602 18 080 190 - Mid-Tex Gas Division Addition 080.60337 37602 12,925 080 190 - Mid-Tex Gas Division Addition 080.60345 37602 14 080 190 - Mid-Tex Gas Division Addition 080.60359 37602 (19) 080 190 - Mid-Tex Gas Division Addition 080.60361 38000 732 080 190 - Mid-Tex Gas Division Addition 080.60364 37602 36 080 190 - Mid-Tex Gas Division Addition 080.60364 38000 6 080 190 - Mid-Tex Gas Division Addition 080.60379 37800 2 080 190 - Mid-Tex Gas Division Addition 080.60381 37602 25 080 190 - Mid-Tex Gas Division Addition 080.60381 38000 7 080 190 - Mid-Tex Gas Division Addition 080.60382 37800 2 080 190 - Mid-Tex Gas Division Addition 080.60383 37800 3 080 190 - Mid-Tex Gas Division Addition 080.60390 37602 2,795 080 190 - Mid-Tex Gas Division Addition 080.60390 38000 698 080 190 - Mid-Tex Gas Division Addition 080.60391 37602 1,668 080 190 - Mid-Tex Gas Division Addition 080.60391 38000 417 080 190 - Mid-Tex Gas Division Addition 080.60396 37601 142 080 190 - Mid-Tex Gas Division Addition 080.60397 37602 59 080 190 - Mid-Tex Gas Division Addition 080.60397 38000 23 080 190 - Mid-Tex Gas Division Addition 080.60399 37601 12 080 190 - Mid-Tex Gas Division Addition 080.60399 37602 688 080 190 - Mid-Tex Gas Division Addition 080.60399 38000 37 080 190 - Mid-Tex Gas Division Addition 080.60402 37602 1 080 190 - Mid-Tex Gas Division Addition 080.60413 37602 39 080 190 - Mid-Tex Gas Division Addition 080.60413 38000 2 080 190 - Mid-Tex Gas Division Addition 080.60419 37602 359 080 190 - Mid-Tex Gas Division Addition 080.60419 38000 19 080 190 - Mid-Tex Gas Division Addition 080.60430 37602 11 080 190 - Mid-Tex Gas Division Addition 080.60439 37602 86 080 190 - Mid-Tex Gas Division Addition 080.60439 38000 1 080 190 - Mid-Tex Gas Division Addition 080.60441 37602 67 080 190 - Mid-Tex Gas Division Addition 080.60441 38000 3 080 190 - Mid-Tex Gas Division Addition 080.60442 37602 23 080 190 - Mid-Tex Gas Division Addition 080.60442 38000 2 080 190 - Mid-Tex Gas Division Addition 080.60446 37602 470 080 190 - Mid-Tex Gas Division Addition 080.60446 38000 148 080 190 - Mid-Tex Gas Division Addition 080.60447 37602 1,339,248 080 190 - Mid-Tex Gas Division Addition 080.60447 38000 70,487 080 190 - Mid-Tex Gas Division Addition 080.60449 37602 93 080 190 - Mid-Tex Gas Division Addition 080.60449 38000 2 080 190 - Mid-Tex Gas Division Addition 080.60452 37602 63 080 190 - Mid-Tex Gas Division Addition 080.60452 38000 3 080 190 - Mid-Tex Gas Division Addition 080.60454 37602 15 080 190 - Mid-Tex Gas Division Addition 080.60454 38000 1 080 190 - Mid-Tex Gas Division Addition 080.60455 37602 89 MTX Additions by FERC Page 26 of 101 424 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.60455 38000 8 080 190 - Mid-Tex Gas Division Addition 080.60473 37601 49 080 190 - Mid-Tex Gas Division Addition 080.60474 37602 13 080 190 - Mid-Tex Gas Division Addition 080.60478 37602 642 080 190 - Mid-Tex Gas Division Addition 080.60478 38000 113 080 190 - Mid-Tex Gas Division Addition 080.60486 37602 82 080 190 - Mid-Tex Gas Division Addition 080.60486 38000 0 080 190 - Mid-Tex Gas Division Addition 080.60495 37602 19 080 190 - Mid-Tex Gas Division Addition 080.60497 37602 77,145 080 190 - Mid-Tex Gas Division Addition 080.60507 37602 126 080 190 - Mid-Tex Gas Division Addition 080.60507 38000 0 080 190 - Mid-Tex Gas Division Addition 080.60516 37602 31 080 190 - Mid-Tex Gas Division Addition 080.60516 38000 2 080 190 - Mid-Tex Gas Division Addition 080.60517 37601 8 080 190 - Mid-Tex Gas Division Addition 080.60517 37800 68 080 190 - Mid-Tex Gas Division Addition 080.60518 37602 21 080 190 - Mid-Tex Gas Division Addition 080.60542 37602 5 080 190 - Mid-Tex Gas Division Addition 080.60546 37602 1,503 080 190 - Mid-Tex Gas Division Addition 080.60546 38000 63 080 190 - Mid-Tex Gas Division Addition 080.60547 37602 2 080 190 - Mid-Tex Gas Division Addition 080.60548 37602 338 080 190 - Mid-Tex Gas Division Addition 080.60548 38000 38 080 190 - Mid-Tex Gas Division Addition 080.60559 37602 43 080 190 - Mid-Tex Gas Division Addition 080.60559 38000 24 080 190 - Mid-Tex Gas Division Addition 080.60560 37602 34 080 190 - Mid-Tex Gas Division Addition 080.60561 37602 16 080 190 - Mid-Tex Gas Division Addition 080.60561 38000 11 080 190 - Mid-Tex Gas Division Addition 080.60572 37602 3 080 190 - Mid-Tex Gas Division Addition 080.60580 37601 643 080 190 - Mid-Tex Gas Division Addition 080.60584 37602 121 080 190 - Mid-Tex Gas Division Addition 080.60584 38000 3 080 190 - Mid-Tex Gas Division Addition 080.60585 37602 91 080 190 - Mid-Tex Gas Division Addition 080.60585 38000 19 080 190 - Mid-Tex Gas Division Addition 080.60586 37602 2,959 080 190 - Mid-Tex Gas Division Addition 080.60586 38000 1,268 080 190 - Mid-Tex Gas Division Addition 080.60596 38000 271 080 190 - Mid-Tex Gas Division Addition 080.60598 38000 98 080 190 - Mid-Tex Gas Division Addition 080.60599 38000 112 080 190 - Mid-Tex Gas Division Addition 080.60604 37602 14 080 190 - Mid-Tex Gas Division Addition 080.60604 38000 1 080 190 - Mid-Tex Gas Division Addition 080.60608 37602 17 080 190 - Mid-Tex Gas Division Addition 080.60611 37602 84 080 190 - Mid-Tex Gas Division Addition 080.60611 38000 53 080 190 - Mid-Tex Gas Division Addition 080.60615 37602 4,043 080 190 - Mid-Tex Gas Division Addition 080.60615 38000 449 080 190 - Mid-Tex Gas Division Addition 080.60616 37602 40 080 190 - Mid-Tex Gas Division Addition 080.60616 38000 1 080 190 - Mid-Tex Gas Division Addition 080.60619 37602 29 080 190 - Mid-Tex Gas Division Addition 080.60619 38000 7 080 190 - Mid-Tex Gas Division Addition 080.60628 37602 141 080 190 - Mid-Tex Gas Division Addition 080.60629 37602 7 080 190 - Mid-Tex Gas Division Addition 080.60629 38000 3 080 190 - Mid-Tex Gas Division Addition 080.60634 37602 18 080 190 - Mid-Tex Gas Division Addition 080.60636 37602 30 080 190 - Mid-Tex Gas Division Addition 080.60644 37800 2 080 190 - Mid-Tex Gas Division Addition 080.60646 37602 15 080 190 - Mid-Tex Gas Division Addition 080.60646 38000 2 080 190 - Mid-Tex Gas Division Addition 080.60655 37602 895 080 190 - Mid-Tex Gas Division Addition 080.60655 38000 47 080 190 - Mid-Tex Gas Division Addition 080.60661 37602 220 080 190 - Mid-Tex Gas Division Addition 080.60661 38000 55 080 190 - Mid-Tex Gas Division Addition 080.60662 37602 4,097 080 190 - Mid-Tex Gas Division Addition 080.60662 38000 723 080 190 - Mid-Tex Gas Division Addition 080.60663 37602 16 080 190 - Mid-Tex Gas Division Addition 080.60664 37602 30 080 190 - Mid-Tex Gas Division Addition 080.60664 38000 20 080 190 - Mid-Tex Gas Division Addition 080.60670 37601 738,066 080 190 - Mid-Tex Gas Division Addition 080.60670 37602 68,657 080 190 - Mid-Tex Gas Division Addition 080.60670 37800 17,165 080 190 - Mid-Tex Gas Division Addition 080.60679 37602 61 080 190 - Mid-Tex Gas Division Addition 080.60681 37602 24 080 190 - Mid-Tex Gas Division Addition 080.60681 38000 12 080 190 - Mid-Tex Gas Division Addition 080.60683 37602 56 080 190 - Mid-Tex Gas Division Addition 080.60683 38000 17 080 190 - Mid-Tex Gas Division Addition 080.60684 37602 37 080 190 - Mid-Tex Gas Division Addition 080.60685 37602 12 080 190 - Mid-Tex Gas Division Addition 080.60685 38000 3 080 190 - Mid-Tex Gas Division Addition 080.60688 37602 33 080 190 - Mid-Tex Gas Division Addition 080.60688 38000 6 080 190 - Mid-Tex Gas Division Addition 080.60691 37602 17,692 080 190 - Mid-Tex Gas Division Addition 080.60691 38000 931 080 190 - Mid-Tex Gas Division Addition 080.60693 37602 7,924 080 190 - Mid-Tex Gas Division Addition 080.60693 38000 163 080 190 - Mid-Tex Gas Division Addition 080.60694 37602 728 080 190 - Mid-Tex Gas Division Addition 080.60694 38000 505 080 190 - Mid-Tex Gas Division Addition 080.60699 37602 8 080 190 - Mid-Tex Gas Division Addition 080.60704 37602 54 080 190 - Mid-Tex Gas Division Addition 080.60704 38000 18 080 190 - Mid-Tex Gas Division Addition 080.60705 37602 51 080 190 - Mid-Tex Gas Division Addition 080.60706 37602 815 080 190 - Mid-Tex Gas Division Addition 080.60706 38000 65 080 190 - Mid-Tex Gas Division Addition 080.60707 37602 117 080 190 - Mid-Tex Gas Division Addition 080.60707 38000 5 080 190 - Mid-Tex Gas Division Addition 080.60714 37602 98 080 190 - Mid-Tex Gas Division Addition 080.60718 37602 74 080 190 - Mid-Tex Gas Division Addition 080.60718 38000 50 080 190 - Mid-Tex Gas Division Addition 080.60719 37602 335 080 190 - Mid-Tex Gas Division Addition 080.60719 38000 112 080 190 - Mid-Tex Gas Division Addition 080.60720 37602 123 080 190 - Mid-Tex Gas Division Addition 080.60721 37602 101 080 190 - Mid-Tex Gas Division Addition 080.60722 37602 75 080 190 - Mid-Tex Gas Division Addition 080.60722 38000 52 080 190 - Mid-Tex Gas Division Addition 080.60723 37602 17 080 190 - Mid-Tex Gas Division Addition 080.60723 38000 8 080 190 - Mid-Tex Gas Division Addition 080.60724 37602 243 080 190 - Mid-Tex Gas Division Addition 080.60724 38000 27 080 190 - Mid-Tex Gas Division Addition 080.60725 37602 48 MTX Additions by FERC Page 27 of 101 425 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.60725 38000 15 080 190 - Mid-Tex Gas Division Addition 080.60727 37602 153 080 190 - Mid-Tex Gas Division Addition 080.60727 38000 188 080 190 - Mid-Tex Gas Division Addition 080.60728 37602 178 080 190 - Mid-Tex Gas Division Addition 080.60728 38000 119 080 190 - Mid-Tex Gas Division Addition 080.60729 37602 312 080 190 - Mid-Tex Gas Division Addition 080.60730 37602 32 080 190 - Mid-Tex Gas Division Addition 080.60730 38000 17 080 190 - Mid-Tex Gas Division Addition 080.60732 37602 2,286 080 190 - Mid-Tex Gas Division Addition 080.60732 38000 889 080 190 - Mid-Tex Gas Division Addition 080.60733 37602 25 080 190 - Mid-Tex Gas Division Addition 080.60733 38000 4 080 190 - Mid-Tex Gas Division Addition 080.60734 37602 70 080 190 - Mid-Tex Gas Division Addition 080.60734 38000 70 080 190 - Mid-Tex Gas Division Addition 080.60735 37602 344 080 190 - Mid-Tex Gas Division Addition 080.60735 38000 91 080 190 - Mid-Tex Gas Division Addition 080.60736 37602 5,175 080 190 - Mid-Tex Gas Division Addition 080.60736 38000 2,114 080 190 - Mid-Tex Gas Division Addition 080.60737 37602 172 080 190 - Mid-Tex Gas Division Addition 080.60737 38000 19 080 190 - Mid-Tex Gas Division Addition 080.60738 37602 16 080 190 - Mid-Tex Gas Division Addition 080.60738 38000 10 080 190 - Mid-Tex Gas Division Addition 080.60740 37602 46 080 190 - Mid-Tex Gas Division Addition 080.60740 38000 11 080 190 - Mid-Tex Gas Division Addition 080.60741 37602 55 080 190 - Mid-Tex Gas Division Addition 080.60741 38000 1 080 190 - Mid-Tex Gas Division Addition 080.60743 37602 206 080 190 - Mid-Tex Gas Division Addition 080.60743 38000 47 080 190 - Mid-Tex Gas Division Addition 080.60744 37602 60 080 190 - Mid-Tex Gas Division Addition 080.60744 38000 3 080 190 - Mid-Tex Gas Division Addition 080.60745 37602 41 080 190 - Mid-Tex Gas Division Addition 080.60745 38000 6 080 190 - Mid-Tex Gas Division Addition 080.60747 37602 938 080 190 - Mid-Tex Gas Division Addition 080.60747 38000 402 080 190 - Mid-Tex Gas Division Addition 080.60750 37602 29 080 190 - Mid-Tex Gas Division Addition 080.60754 37601 95,557 080 190 - Mid-Tex Gas Division Addition 080.60754 37602 23,897 080 190 - Mid-Tex Gas Division Addition 080.60760 37602 24 080 190 - Mid-Tex Gas Division Addition 080.60760 38000 1 080 190 - Mid-Tex Gas Division Addition 080.60763 37602 309 080 190 - Mid-Tex Gas Division Addition 080.60769 37602 42,727 080 190 - Mid-Tex Gas Division Addition 080.60769 38000 6,957 080 190 - Mid-Tex Gas Division Addition 080.60770 37602 3 080 190 - Mid-Tex Gas Division Addition 080.60770 38000 1 080 190 - Mid-Tex Gas Division Addition 080.60781 37602 22 080 190 - Mid-Tex Gas Division Addition 080.60781 38000 5 080 190 - Mid-Tex Gas Division Addition 080.60797 37602 619 080 190 - Mid-Tex Gas Division Addition 080.60797 38000 413 080 190 - Mid-Tex Gas Division Addition 080.60806 37602 30 080 190 - Mid-Tex Gas Division Addition 080.60808 37602 13,754 080 190 - Mid-Tex Gas Division Addition 080.60808 38000 1,528 080 190 - Mid-Tex Gas Division Addition 080.60809 37602 28 080 190 - Mid-Tex Gas Division Addition 080.60809 38000 12 080 190 - Mid-Tex Gas Division Addition 080.60817 37602 5 080 190 - Mid-Tex Gas Division Addition 080.60822 37602 37 080 190 - Mid-Tex Gas Division Addition 080.60822 38000 8 080 190 - Mid-Tex Gas Division Addition 080.60823 37602 170 080 190 - Mid-Tex Gas Division Addition 080.60826 37602 85 080 190 - Mid-Tex Gas Division Addition 080.60826 38000 28 080 190 - Mid-Tex Gas Division Addition 080.60844 37602 13 080 190 - Mid-Tex Gas Division Addition 080.60844 38000 3 080 190 - Mid-Tex Gas Division Addition 080.60847 37602 30 080 190 - Mid-Tex Gas Division Addition 080.60847 38000 8 080 190 - Mid-Tex Gas Division Addition 080.60852 37602 41 080 190 - Mid-Tex Gas Division Addition 080.60857 37602 57 080 190 - Mid-Tex Gas Division Addition 080.60857 38000 13 080 190 - Mid-Tex Gas Division Addition 080.60859 37602 35 080 190 - Mid-Tex Gas Division Addition 080.60859 38000 11 080 190 - Mid-Tex Gas Division Addition 080.60865 37602 30 080 190 - Mid-Tex Gas Division Addition 080.60865 38000 19 080 190 - Mid-Tex Gas Division Addition 080.60866 37602 25 080 190 - Mid-Tex Gas Division Addition 080.60866 38000 4 080 190 - Mid-Tex Gas Division Addition 080.60868 37602 102 080 190 - Mid-Tex Gas Division Addition 080.60868 38000 17 080 190 - Mid-Tex Gas Division Addition 080.60871 37602 79 080 190 - Mid-Tex Gas Division Addition 080.60871 37800 21 080 190 - Mid-Tex Gas Division Addition 080.60871 38000 5 080 190 - Mid-Tex Gas Division Addition 080.60872 37602 32 080 190 - Mid-Tex Gas Division Addition 080.60872 38000 6 080 190 - Mid-Tex Gas Division Addition 080.60878 37602 1,044 080 190 - Mid-Tex Gas Division Addition 080.60878 38000 1,044 080 190 - Mid-Tex Gas Division Addition 080.60879 37800 3 080 190 - Mid-Tex Gas Division Addition 080.60886 37602 488,225 080 190 - Mid-Tex Gas Division Addition 080.60894 37602 28 080 190 - Mid-Tex Gas Division Addition 080.60894 38000 5 080 190 - Mid-Tex Gas Division Addition 080.60897 37602 327 080 190 - Mid-Tex Gas Division Addition 080.60897 38000 36 080 190 - Mid-Tex Gas Division Addition 080.60898 37602 168,475 080 190 - Mid-Tex Gas Division Addition 080.60899 37601 128 080 190 - Mid-Tex Gas Division Addition 080.60911 37602 26 080 190 - Mid-Tex Gas Division Addition 080.60914 37602 45 080 190 - Mid-Tex Gas Division Addition 080.60917 37600 7,276 080 190 - Mid-Tex Gas Division Addition 080.60917 37800 808 080 190 - Mid-Tex Gas Division Addition 080.60922 37602 181 080 190 - Mid-Tex Gas Division Addition 080.60930 37602 109 080 190 - Mid-Tex Gas Division Addition 080.60930 38000 2 080 190 - Mid-Tex Gas Division Addition 080.60931 37602 9 080 190 - Mid-Tex Gas Division Addition 080.60931 38000 2 080 190 - Mid-Tex Gas Division Addition 080.60933 37602 51 080 190 - Mid-Tex Gas Division Addition 080.60933 38000 2 080 190 - Mid-Tex Gas Division Addition 080.60934 37602 47 080 190 - Mid-Tex Gas Division Addition 080.60934 38000 1 080 190 - Mid-Tex Gas Division Addition 080.60942 37602 57 080 190 - Mid-Tex Gas Division Addition 080.60942 38000 6 080 190 - Mid-Tex Gas Division Addition 080.60943 37602 11,138,105 080 190 - Mid-Tex Gas Division Addition 080.60943 38000 (4,477,953) 080 190 - Mid-Tex Gas Division Addition 080.60944 37602 456,020 MTX Additions by FERC Page 28 of 101 426 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.60944 38000 (366,075) 080 190 - Mid-Tex Gas Division Addition 080.60946 37602 8,557 080 190 - Mid-Tex Gas Division Addition 080.60946 38000 2,395 080 190 - Mid-Tex Gas Division Addition 080.60960 37602 25 080 190 - Mid-Tex Gas Division Addition 080.60960 38000 1 080 190 - Mid-Tex Gas Division Addition 080.60967 37602 50 080 190 - Mid-Tex Gas Division Addition 080.60967 38000 3 080 190 - Mid-Tex Gas Division Addition 080.61000 37602 251 080 190 - Mid-Tex Gas Division Addition 080.61000 38000 28 080 190 - Mid-Tex Gas Division Addition 080.61007 37602 32 080 190 - Mid-Tex Gas Division Addition 080.61007 38000 4 080 190 - Mid-Tex Gas Division Addition 080.61042 37602 13 080 190 - Mid-Tex Gas Division Addition 080.61058 37600 14 080 190 - Mid-Tex Gas Division Addition 080.61058 37602 707 080 190 - Mid-Tex Gas Division Addition 080.61069 37602 15 080 190 - Mid-Tex Gas Division Addition 080.61071 37602 78 080 190 - Mid-Tex Gas Division Addition 080.61071 38000 2 080 190 - Mid-Tex Gas Division Addition 080.61072 37602 15 080 190 - Mid-Tex Gas Division Addition 080.61072 38000 5 080 190 - Mid-Tex Gas Division Addition 080.61075 37602 (15) 080 190 - Mid-Tex Gas Division Addition 080.61087 37602 29 080 190 - Mid-Tex Gas Division Addition 080.61087 38000 2 080 190 - Mid-Tex Gas Division Addition 080.61088 37800 1 080 190 - Mid-Tex Gas Division Addition 080.61101 37602 2,048 080 190 - Mid-Tex Gas Division Addition 080.61116 37602 5 080 190 - Mid-Tex Gas Division Addition 080.61119 37602 19 080 190 - Mid-Tex Gas Division Addition 080.61121 37602 7,240 080 190 - Mid-Tex Gas Division Addition 080.61121 38000 505 080 190 - Mid-Tex Gas Division Addition 080.61133 37800 19 080 190 - Mid-Tex Gas Division Addition 080.61144 37602 15 080 190 - Mid-Tex Gas Division Addition 080.61146 38000 332 080 190 - Mid-Tex Gas Division Addition 080.61162 37602 13 080 190 - Mid-Tex Gas Division Addition 080.61165 37601 0 080 190 - Mid-Tex Gas Division Addition 080.61182 37602 359 080 190 - Mid-Tex Gas Division Addition 080.61182 38000 19 080 190 - Mid-Tex Gas Division Addition 080.61183 37602 145 080 190 - Mid-Tex Gas Division Addition 080.61183 38000 8 080 190 - Mid-Tex Gas Division Addition 080.61193 37602 27 080 190 - Mid-Tex Gas Division Addition 080.61193 38000 9 080 190 - Mid-Tex Gas Division Addition 080.61196 37601 41 080 190 - Mid-Tex Gas Division Addition 080.61196 37602 41 080 190 - Mid-Tex Gas Division Addition 080.61196 37800 122 080 190 - Mid-Tex Gas Division Addition 080.61204 37602 4 080 190 - Mid-Tex Gas Division Addition 080.61204 38000 0 080 190 - Mid-Tex Gas Division Addition 080.61214 37601 117,116 080 190 - Mid-Tex Gas Division Addition 080.61214 37602 29,279 080 190 - Mid-Tex Gas Division Addition 080.61216 37601 35 080 190 - Mid-Tex Gas Division Addition 080.61216 37800 9 080 190 - Mid-Tex Gas Division Addition 080.61227 37602 42 080 190 - Mid-Tex Gas Division Addition 080.61227 38000 2 080 190 - Mid-Tex Gas Division Addition 080.61247 37602 85,701 080 190 - Mid-Tex Gas Division Addition 080.61247 38000 9,522 080 190 - Mid-Tex Gas Division Addition 080.61259 37602 61 080 190 - Mid-Tex Gas Division Addition 080.61272 37602 7 080 190 - Mid-Tex Gas Division Addition 080.61272 38000 1 080 190 - Mid-Tex Gas Division Addition 080.61273 37602 9 080 190 - Mid-Tex Gas Division Addition 080.61273 38000 3 080 190 - Mid-Tex Gas Division Addition 080.61278 37602 729 080 190 - Mid-Tex Gas Division Addition 080.61300 37602 1,649 080 190 - Mid-Tex Gas Division Addition 080.61305 37602 10 080 190 - Mid-Tex Gas Division Addition 080.61307 37602 162 080 190 - Mid-Tex Gas Division Addition 080.61307 38000 29 080 190 - Mid-Tex Gas Division Addition 080.61310 37602 7,503 080 190 - Mid-Tex Gas Division Addition 080.61310 38000 153 080 190 - Mid-Tex Gas Division Addition 080.61312 37602 38 080 190 - Mid-Tex Gas Division Addition 080.61312 38000 13 080 190 - Mid-Tex Gas Division Addition 080.61319 37800 2 080 190 - Mid-Tex Gas Division Addition 080.61325 37602 2 080 190 - Mid-Tex Gas Division Addition 080.61325 38000 0 080 190 - Mid-Tex Gas Division Addition 080.61326 37602 4,199 080 190 - Mid-Tex Gas Division Addition 080.61326 38000 922 080 190 - Mid-Tex Gas Division Addition 080.61327 37602 1,874 080 190 - Mid-Tex Gas Division Addition 080.61327 38000 460 080 190 - Mid-Tex Gas Division Addition 080.61338 37602 266 080 190 - Mid-Tex Gas Division Addition 080.61338 38000 125 080 190 - Mid-Tex Gas Division Addition 080.61343 37602 909 080 190 - Mid-Tex Gas Division Addition 080.61343 38000 348 080 190 - Mid-Tex Gas Division Addition 080.61348 37602 1,656 080 190 - Mid-Tex Gas Division Addition 080.61348 38000 414 080 190 - Mid-Tex Gas Division Addition 080.61362 37602 9,892 080 190 - Mid-Tex Gas Division Addition 080.61362 38000 412 080 190 - Mid-Tex Gas Division Addition 080.61371 37602 583 080 190 - Mid-Tex Gas Division Addition 080.61371 38000 128 080 190 - Mid-Tex Gas Division Addition 080.61373 37602 7,010 080 190 - Mid-Tex Gas Division Addition 080.61375 37602 23 080 190 - Mid-Tex Gas Division Addition 080.61392 37601 18,360 080 190 - Mid-Tex Gas Division Addition 080.61398 37602 26 080 190 - Mid-Tex Gas Division Addition 080.61398 38000 26 080 190 - Mid-Tex Gas Division Addition 080.61404 37602 4 080 190 - Mid-Tex Gas Division Addition 080.61408 37602 8 080 190 - Mid-Tex Gas Division Addition 080.61410 37602 158 080 190 - Mid-Tex Gas Division Addition 080.61410 38000 8 080 190 - Mid-Tex Gas Division Addition 080.61414 37601 1,048 080 190 - Mid-Tex Gas Division Addition 080.61414 37602 28,964 080 190 - Mid-Tex Gas Division Addition 080.61414 38000 3,669 080 190 - Mid-Tex Gas Division Addition 080.61436 37602 40 080 190 - Mid-Tex Gas Division Addition 080.61436 38000 22 080 190 - Mid-Tex Gas Division Addition 080.61438 37602 167 080 190 - Mid-Tex Gas Division Addition 080.61438 38000 19 080 190 - Mid-Tex Gas Division Addition 080.61444 37602 721 080 190 - Mid-Tex Gas Division Addition 080.61444 38000 267 080 190 - Mid-Tex Gas Division Addition 080.61448 37602 15 080 190 - Mid-Tex Gas Division Addition 080.61453 37602 (545) 080 190 - Mid-Tex Gas Division Addition 080.61453 38000 (136) 080 190 - Mid-Tex Gas Division Addition 080.61461 37602 33 080 190 - Mid-Tex Gas Division Addition 080.61462 37602 2,329 080 190 - Mid-Tex Gas Division Addition 080.61462 38000 1,552 MTX Additions by FERC Page 29 of 101 427 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.61475 37602 231 080 190 - Mid-Tex Gas Division Addition 080.61475 38000 12 080 190 - Mid-Tex Gas Division Addition 080.61482 37602 31 080 190 - Mid-Tex Gas Division Addition 080.61482 38000 21 080 190 - Mid-Tex Gas Division Addition 080.61488 37602 47 080 190 - Mid-Tex Gas Division Addition 080.61488 38000 8 080 190 - Mid-Tex Gas Division Addition 080.61493 37602 5 080 190 - Mid-Tex Gas Division Addition 080.61493 38000 0 080 190 - Mid-Tex Gas Division Addition 080.61502 37602 3 080 190 - Mid-Tex Gas Division Addition 080.61502 38000 0 080 190 - Mid-Tex Gas Division Addition 080.61533 37602 73 080 190 - Mid-Tex Gas Division Addition 080.61533 38000 2 080 190 - Mid-Tex Gas Division Addition 080.61538 37601 3 080 190 - Mid-Tex Gas Division Addition 080.61540 37602 486 080 190 - Mid-Tex Gas Division Addition 080.61540 38000 37 080 190 - Mid-Tex Gas Division Addition 080.61544 37602 4,150 080 190 - Mid-Tex Gas Division Addition 080.61544 38000 1,310 080 190 - Mid-Tex Gas Division Addition 080.61545 37602 2 080 190 - Mid-Tex Gas Division Addition 080.61552 37602 3,986 080 190 - Mid-Tex Gas Division Addition 080.61552 38000 210 080 190 - Mid-Tex Gas Division Addition 080.61558 37900 3 080 190 - Mid-Tex Gas Division Addition 080.61566 37602 1,294 080 190 - Mid-Tex Gas Division Addition 080.61566 38000 68 080 190 - Mid-Tex Gas Division Addition 080.61573 37602 138 080 190 - Mid-Tex Gas Division Addition 080.61573 38000 15 080 190 - Mid-Tex Gas Division Addition 080.61594 37602 21,548,148 080 190 - Mid-Tex Gas Division Addition 080.61594 38000 21,191,977 080 190 - Mid-Tex Gas Division Addition 080.61595 37602 7,162,716 080 190 - Mid-Tex Gas Division Addition 080.61595 38000 5,474,020 080 190 - Mid-Tex Gas Division Addition 080.61597 37602 1,130,480 080 190 - Mid-Tex Gas Division Addition 080.61597 38000 953,407 080 190 - Mid-Tex Gas Division Addition 080.61600 37602 20 080 190 - Mid-Tex Gas Division Addition 080.61600 38000 5 080 190 - Mid-Tex Gas Division Addition 080.61622 37602 78,079 080 190 - Mid-Tex Gas Division Addition 080.61622 38000 4,121 080 190 - Mid-Tex Gas Division Addition 080.61625 37601 5,597 080 190 - Mid-Tex Gas Division Addition 080.61630 37600 7 080 190 - Mid-Tex Gas Division Addition 080.61634 37602 603 080 190 - Mid-Tex Gas Division Addition 080.61634 38000 151 080 190 - Mid-Tex Gas Division Addition 080.61641 37601 23 080 190 - Mid-Tex Gas Division Addition 080.61651 37602 17 080 190 - Mid-Tex Gas Division Addition 080.61652 37602 221,115 080 190 - Mid-Tex Gas Division Addition 080.61652 38000 14,114 080 190 - Mid-Tex Gas Division Addition 080.61671 37602 12 080 190 - Mid-Tex Gas Division Addition 080.61672 37602 195 080 190 - Mid-Tex Gas Division Addition 080.61672 38000 10 080 190 - Mid-Tex Gas Division Addition 080.61677 37602 14 080 190 - Mid-Tex Gas Division Addition 080.61684 37601 12 080 190 - Mid-Tex Gas Division Addition 080.61686 37602 3,837 080 190 - Mid-Tex Gas Division Addition 080.61686 38000 1,279 080 190 - Mid-Tex Gas Division Addition 080.61688 37602 3,323 080 190 - Mid-Tex Gas Division Addition 080.61688 38000 831 080 190 - Mid-Tex Gas Division Addition 080.61692 37601 39 080 190 - Mid-Tex Gas Division Addition 080.61696 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.61699 37602 1,802 080 190 - Mid-Tex Gas Division Addition 080.61699 38000 601 080 190 - Mid-Tex Gas Division Addition 080.61702 37602 2,144 080 190 - Mid-Tex Gas Division Addition 080.61702 38000 715 080 190 - Mid-Tex Gas Division Addition 080.61715 37602 2 080 190 - Mid-Tex Gas Division Addition 080.61716 37602 21 080 190 - Mid-Tex Gas Division Addition 080.61718 37602 848 080 190 - Mid-Tex Gas Division Addition 080.61718 38000 208 080 190 - Mid-Tex Gas Division Addition 080.61721 37602 26 080 190 - Mid-Tex Gas Division Addition 080.61724 37602 21 080 190 - Mid-Tex Gas Division Addition 080.61724 38000 1 080 190 - Mid-Tex Gas Division Addition 080.61750 37602 53 080 190 - Mid-Tex Gas Division Addition 080.61750 38000 6 080 190 - Mid-Tex Gas Division Addition 080.61774 37602 8 080 190 - Mid-Tex Gas Division Addition 080.61774 37800 1 080 190 - Mid-Tex Gas Division Addition 080.61787 37602 410 080 190 - Mid-Tex Gas Division Addition 080.61794 37602 5 080 190 - Mid-Tex Gas Division Addition 080.61794 37800 19 080 190 - Mid-Tex Gas Division Addition 080.61795 37602 35 080 190 - Mid-Tex Gas Division Addition 080.61795 38000 9 080 190 - Mid-Tex Gas Division Addition 080.61799 37602 2,448 080 190 - Mid-Tex Gas Division Addition 080.61799 38000 129 080 190 - Mid-Tex Gas Division Addition 080.61807 37601 45 080 190 - Mid-Tex Gas Division Addition 080.61845 37601 3 080 190 - Mid-Tex Gas Division Addition 080.61855 37602 9 080 190 - Mid-Tex Gas Division Addition 080.61855 38000 0 080 190 - Mid-Tex Gas Division Addition 080.61880 37602 877 080 190 - Mid-Tex Gas Division Addition 080.61884 37602 390 080 190 - Mid-Tex Gas Division Addition 080.61884 38000 25 080 190 - Mid-Tex Gas Division Addition 080.61891 37602 133 080 190 - Mid-Tex Gas Division Addition 080.61891 38000 1 080 190 - Mid-Tex Gas Division Addition 080.61892 37602 21 080 190 - Mid-Tex Gas Division Addition 080.61892 38000 1 080 190 - Mid-Tex Gas Division Addition 080.61893 37602 15 080 190 - Mid-Tex Gas Division Addition 080.61893 38000 1 080 190 - Mid-Tex Gas Division Addition 080.61899 37602 14 080 190 - Mid-Tex Gas Division Addition 080.61903 37602 20 080 190 - Mid-Tex Gas Division Addition 080.61912 37602 1,042 080 190 - Mid-Tex Gas Division Addition 080.61912 38000 50 080 190 - Mid-Tex Gas Division Addition 080.61916 37602 74 080 190 - Mid-Tex Gas Division Addition 080.61916 38000 8 080 190 - Mid-Tex Gas Division Addition 080.61918 37602 26,959 080 190 - Mid-Tex Gas Division Addition 080.61918 38000 1,424 080 190 - Mid-Tex Gas Division Addition 080.61919 37800 8 080 190 - Mid-Tex Gas Division Addition 080.61928 37602 1,108 080 190 - Mid-Tex Gas Division Addition 080.61930 37602 2,396 080 190 - Mid-Tex Gas Division Addition 080.61930 38000 562 080 190 - Mid-Tex Gas Division Addition 080.61931 37602 107 080 190 - Mid-Tex Gas Division Addition 080.61931 38000 46 080 190 - Mid-Tex Gas Division Addition 080.61937 37602 1,414 080 190 - Mid-Tex Gas Division Addition 080.61937 38000 74 080 190 - Mid-Tex Gas Division Addition 080.61944 37602 1 080 190 - Mid-Tex Gas Division Addition 080.61946 37602 3 MTX Additions by FERC Page 30 of 101 428 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.61947 37602 47 080 190 - Mid-Tex Gas Division Addition 080.61947 37800 13 080 190 - Mid-Tex Gas Division Addition 080.61947 38000 7 080 190 - Mid-Tex Gas Division Addition 080.61964 37602 3,427 080 190 - Mid-Tex Gas Division Addition 080.61964 38000 381 080 190 - Mid-Tex Gas Division Addition 080.61965 37601 23,631 080 190 - Mid-Tex Gas Division Addition 080.61965 37602 2,110 080 190 - Mid-Tex Gas Division Addition 080.61965 37800 16,457 080 190 - Mid-Tex Gas Division Addition 080.61985 37602 20 080 190 - Mid-Tex Gas Division Addition 080.61985 38000 0 080 190 - Mid-Tex Gas Division Addition 080.61989 37602 2,803 080 190 - Mid-Tex Gas Division Addition 080.61989 38000 294 080 190 - Mid-Tex Gas Division Addition 080.61991 37602 54 080 190 - Mid-Tex Gas Division Addition 080.61991 38000 15 080 190 - Mid-Tex Gas Division Addition 080.61994 37602 131 080 190 - Mid-Tex Gas Division Addition 080.61995 37602 80,255 080 190 - Mid-Tex Gas Division Addition 080.61995 38000 8,914 080 190 - Mid-Tex Gas Division Addition 080.62004 37602 1,764 080 190 - Mid-Tex Gas Division Addition 080.62004 38000 441 080 190 - Mid-Tex Gas Division Addition 080.62014 37602 484 080 190 - Mid-Tex Gas Division Addition 080.62014 38000 7 080 190 - Mid-Tex Gas Division Addition 080.62019 37602 6,853 080 190 - Mid-Tex Gas Division Addition 080.62019 38000 1,822 080 190 - Mid-Tex Gas Division Addition 080.62034 37602 857 080 190 - Mid-Tex Gas Division Addition 080.62034 38000 9 080 190 - Mid-Tex Gas Division Addition 080.62036 37601 36 080 190 - Mid-Tex Gas Division Addition 080.62036 37602 3,514 080 190 - Mid-Tex Gas Division Addition 080.62036 38000 72 080 190 - Mid-Tex Gas Division Addition 080.62044 37602 387 080 190 - Mid-Tex Gas Division Addition 080.62044 38000 43 080 190 - Mid-Tex Gas Division Addition 080.62048 37602 (45) 080 190 - Mid-Tex Gas Division Addition 080.62049 37602 877 080 190 - Mid-Tex Gas Division Addition 080.62049 38000 292 080 190 - Mid-Tex Gas Division Addition 080.62052 37602 1,323 080 190 - Mid-Tex Gas Division Addition 080.62052 37800 27 080 190 - Mid-Tex Gas Division Addition 080.62053 37602 748 080 190 - Mid-Tex Gas Division Addition 080.62053 38000 249 080 190 - Mid-Tex Gas Division Addition 080.62055 37602 12 080 190 - Mid-Tex Gas Division Addition 080.62055 38000 1 080 190 - Mid-Tex Gas Division Addition 080.62065 37602 11 080 190 - Mid-Tex Gas Division Addition 080.62065 38000 0 080 190 - Mid-Tex Gas Division Addition 080.62070 37602 29 080 190 - Mid-Tex Gas Division Addition 080.62070 38000 86 080 190 - Mid-Tex Gas Division Addition 080.62072 37602 137 080 190 - Mid-Tex Gas Division Addition 080.62072 37800 372 080 190 - Mid-Tex Gas Division Addition 080.62084 37602 10 080 190 - Mid-Tex Gas Division Addition 080.62089 37601 0 080 190 - Mid-Tex Gas Division Addition 080.62092 37602 98,408 080 190 - Mid-Tex Gas Division Addition 080.62093 37602 58,741 080 190 - Mid-Tex Gas Division Addition 080.62093 38000 3,092 080 190 - Mid-Tex Gas Division Addition 080.62099 37602 4 080 190 - Mid-Tex Gas Division Addition 080.62099 38000 1 080 190 - Mid-Tex Gas Division Addition 080.62102 37602 2,104 080 190 - Mid-Tex Gas Division Addition 080.62102 38000 111 080 190 - Mid-Tex Gas Division Addition 080.62146 37602 45 080 190 - Mid-Tex Gas Division Addition 080.62146 38000 19 080 190 - Mid-Tex Gas Division Addition 080.62151 37602 46 080 190 - Mid-Tex Gas Division Addition 080.62160 37602 3,585 080 190 - Mid-Tex Gas Division Addition 080.62160 38000 396 080 190 - Mid-Tex Gas Division Addition 080.62174 37602 91 080 190 - Mid-Tex Gas Division Addition 080.62184 37601 0 080 190 - Mid-Tex Gas Division Addition 080.62184 37602 2 080 190 - Mid-Tex Gas Division Addition 080.62184 37800 7 080 190 - Mid-Tex Gas Division Addition 080.62185 37601 - 080 190 - Mid-Tex Gas Division Addition 080.62185 37602 0 080 190 - Mid-Tex Gas Division Addition 080.62185 37800 4 080 190 - Mid-Tex Gas Division Addition 080.62192 37602 102 080 190 - Mid-Tex Gas Division Addition 080.62192 38000 3 080 190 - Mid-Tex Gas Division Addition 080.62202 37602 484 080 190 - Mid-Tex Gas Division Addition 080.62202 38000 53 080 190 - Mid-Tex Gas Division Addition 080.62203 37602 25 080 190 - Mid-Tex Gas Division Addition 080.62204 37602 2,954 080 190 - Mid-Tex Gas Division Addition 080.62204 38000 328 080 190 - Mid-Tex Gas Division Addition 080.62206 37602 2,718 080 190 - Mid-Tex Gas Division Addition 080.62206 38000 679 080 190 - Mid-Tex Gas Division Addition 080.62210 37602 764 080 190 - Mid-Tex Gas Division Addition 080.62210 38000 68 080 190 - Mid-Tex Gas Division Addition 080.62211 37602 3,008 080 190 - Mid-Tex Gas Division Addition 080.62211 38000 752 080 190 - Mid-Tex Gas Division Addition 080.62212 37602 2,257 080 190 - Mid-Tex Gas Division Addition 080.62212 38000 564 080 190 - Mid-Tex Gas Division Addition 080.62213 37602 48,315 080 190 - Mid-Tex Gas Division Addition 080.62213 38000 12,079 080 190 - Mid-Tex Gas Division Addition 080.62218 37602 159 080 190 - Mid-Tex Gas Division Addition 080.62218 38000 68 080 190 - Mid-Tex Gas Division Addition 080.62219 37602 738 080 190 - Mid-Tex Gas Division Addition 080.62219 38000 221 080 190 - Mid-Tex Gas Division Addition 080.62221 37600 523 080 190 - Mid-Tex Gas Division Addition 080.62227 37602 16,082 080 190 - Mid-Tex Gas Division Addition 080.62229 37602 948 080 190 - Mid-Tex Gas Division Addition 080.62236 37601 (348,055) 080 190 - Mid-Tex Gas Division Addition 080.62236 37602 2,151,815 080 190 - Mid-Tex Gas Division Addition 080.62236 38000 257,001 080 190 - Mid-Tex Gas Division Addition 080.62276 37602 602 080 190 - Mid-Tex Gas Division Addition 080.62276 38000 32 080 190 - Mid-Tex Gas Division Addition 080.62278 37602 25,087 080 190 - Mid-Tex Gas Division Addition 080.62278 38000 8,362 080 190 - Mid-Tex Gas Division Addition 080.62279 37601 2,837 080 190 - Mid-Tex Gas Division Addition 080.62280 37602 1,758 080 190 - Mid-Tex Gas Division Addition 080.62280 38000 310 080 190 - Mid-Tex Gas Division Addition 080.62283 37602 53 080 190 - Mid-Tex Gas Division Addition 080.62295 37602 (149) 080 190 - Mid-Tex Gas Division Addition 080.62295 38000 (24) 080 190 - Mid-Tex Gas Division Addition 080.62297 37602 2,098 080 190 - Mid-Tex Gas Division Addition 080.62297 38000 1,399 080 190 - Mid-Tex Gas Division Addition 080.62303 37800 565 080 190 - Mid-Tex Gas Division Addition 080.62309 37602 2,703 MTX Additions by FERC Page 31 of 101 429 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.62309 38000 676 080 190 - Mid-Tex Gas Division Addition 080.62310 37602 21,198 080 190 - Mid-Tex Gas Division Addition 080.62310 38000 883 080 190 - Mid-Tex Gas Division Addition 080.62311 37602 16,701 080 190 - Mid-Tex Gas Division Addition 080.62312 37602 4,429 080 190 - Mid-Tex Gas Division Addition 080.62312 38000 333 080 190 - Mid-Tex Gas Division Addition 080.62313 37602 21,560 080 190 - Mid-Tex Gas Division Addition 080.62313 38000 7,187 080 190 - Mid-Tex Gas Division Addition 080.62315 37602 5,509 080 190 - Mid-Tex Gas Division Addition 080.62328 37602 59 080 190 - Mid-Tex Gas Division Addition 080.62333 37601 0 080 190 - Mid-Tex Gas Division Addition 080.62333 37602 1 080 190 - Mid-Tex Gas Division Addition 080.62336 37800 (7) 080 190 - Mid-Tex Gas Division Addition 080.62338 37602 13 080 190 - Mid-Tex Gas Division Addition 080.62338 38000 0 080 190 - Mid-Tex Gas Division Addition 080.62339 37800 (0) 080 190 - Mid-Tex Gas Division Addition 080.62341 37800 (0) 080 190 - Mid-Tex Gas Division Addition 080.62357 37602 17,182 080 190 - Mid-Tex Gas Division Addition 080.62357 38000 3,772 080 190 - Mid-Tex Gas Division Addition 080.62358 37602 11,698 080 190 - Mid-Tex Gas Division Addition 080.62358 38000 239 080 190 - Mid-Tex Gas Division Addition 080.62359 37602 1,311 080 190 - Mid-Tex Gas Division Addition 080.62359 38000 69 080 190 - Mid-Tex Gas Division Addition 080.62366 37602 7,058 080 190 - Mid-Tex Gas Division Addition 080.62366 38000 371 080 190 - Mid-Tex Gas Division Addition 080.62376 37602 117 080 190 - Mid-Tex Gas Division Addition 080.62376 38000 13 080 190 - Mid-Tex Gas Division Addition 080.62380 37602 2,888 080 190 - Mid-Tex Gas Division Addition 080.62380 38000 287 080 190 - Mid-Tex Gas Division Addition 080.62382 37602 45 080 190 - Mid-Tex Gas Division Addition 080.62382 38000 2 080 190 - Mid-Tex Gas Division Addition 080.62383 37602 1,876 080 190 - Mid-Tex Gas Division Addition 080.62383 38000 208 080 190 - Mid-Tex Gas Division Addition 080.62386 37602 22 080 190 - Mid-Tex Gas Division Addition 080.62386 38000 2 080 190 - Mid-Tex Gas Division Addition 080.62387 37602 7 080 190 - Mid-Tex Gas Division Addition 080.62387 38000 1 080 190 - Mid-Tex Gas Division Addition 080.62391 37601 3,772 080 190 - Mid-Tex Gas Division Addition 080.62391 37602 2,829 080 190 - Mid-Tex Gas Division Addition 080.62397 37602 2 080 190 - Mid-Tex Gas Division Addition 080.62398 37602 - 080 190 - Mid-Tex Gas Division Addition 080.62398 38000 - 080 190 - Mid-Tex Gas Division Addition 080.62399 37602 49,625 080 190 - Mid-Tex Gas Division Addition 080.62399 38000 2,610 080 190 - Mid-Tex Gas Division Addition 080.62404 37602 197 080 190 - Mid-Tex Gas Division Addition 080.62408 37602 3 080 190 - Mid-Tex Gas Division Addition 080.62409 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.62419 37602 318 080 190 - Mid-Tex Gas Division Addition 080.62419 38000 106 080 190 - Mid-Tex Gas Division Addition 080.62420 37602 5,192 080 190 - Mid-Tex Gas Division Addition 080.62420 38000 1,732 080 190 - Mid-Tex Gas Division Addition 080.62422 37602 31,736 080 190 - Mid-Tex Gas Division Addition 080.62423 37601 85,294 080 190 - Mid-Tex Gas Division Addition 080.62423 37800 2,638 080 190 - Mid-Tex Gas Division Addition 080.62425 37602 7,975 080 190 - Mid-Tex Gas Division Addition 080.62425 38000 3,418 080 190 - Mid-Tex Gas Division Addition 080.62439 37602 1,580 080 190 - Mid-Tex Gas Division Addition 080.62439 38000 526 080 190 - Mid-Tex Gas Division Addition 080.62440 37602 - 080 190 - Mid-Tex Gas Division Addition 080.62441 37602 3,448 080 190 - Mid-Tex Gas Division Addition 080.62441 38000 862 080 190 - Mid-Tex Gas Division Addition 080.62447 38000 1,748 080 190 - Mid-Tex Gas Division Addition 080.62448 37602 16 080 190 - Mid-Tex Gas Division Addition 080.62457 37602 93 080 190 - Mid-Tex Gas Division Addition 080.62457 37800 280 080 190 - Mid-Tex Gas Division Addition 080.62461 37602 6,788 080 190 - Mid-Tex Gas Division Addition 080.62492 37602 3,228 080 190 - Mid-Tex Gas Division Addition 080.62492 38000 806 080 190 - Mid-Tex Gas Division Addition 080.62513 37602 2,022 080 190 - Mid-Tex Gas Division Addition 080.62513 38000 41 080 190 - Mid-Tex Gas Division Addition 080.62517 37602 149 080 190 - Mid-Tex Gas Division Addition 080.62517 38000 17 080 190 - Mid-Tex Gas Division Addition 080.62523 37602 23 080 190 - Mid-Tex Gas Division Addition 080.62527 37600 20 080 190 - Mid-Tex Gas Division Addition 080.62553 37602 81 080 190 - Mid-Tex Gas Division Addition 080.62553 38000 14 080 190 - Mid-Tex Gas Division Addition 080.62555 37602 3,091 080 190 - Mid-Tex Gas Division Addition 080.62555 38000 62 080 190 - Mid-Tex Gas Division Addition 080.62571 37601 2,621 080 190 - Mid-Tex Gas Division Addition 080.62571 37800 615 080 190 - Mid-Tex Gas Division Addition 080.62590 37800 (12) 080 190 - Mid-Tex Gas Division Addition 080.62609 37602 3,598 080 190 - Mid-Tex Gas Division Addition 080.62609 38000 1,938 080 190 - Mid-Tex Gas Division Addition 080.62612 37602 59 080 190 - Mid-Tex Gas Division Addition 080.62613 37602 23 080 190 - Mid-Tex Gas Division Addition 080.62613 38000 14 080 190 - Mid-Tex Gas Division Addition 080.62630 37602 1,683 080 190 - Mid-Tex Gas Division Addition 080.62635 37602 3 080 190 - Mid-Tex Gas Division Addition 080.62637 37800 42 080 190 - Mid-Tex Gas Division Addition 080.62639 37602 17 080 190 - Mid-Tex Gas Division Addition 080.62641 37602 160 080 190 - Mid-Tex Gas Division Addition 080.62641 38000 28 080 190 - Mid-Tex Gas Division Addition 080.62657 37602 2,674 080 190 - Mid-Tex Gas Division Addition 080.62657 38000 668 080 190 - Mid-Tex Gas Division Addition 080.62688 37601 24 080 190 - Mid-Tex Gas Division Addition 080.62689 37601 6,056 080 190 - Mid-Tex Gas Division Addition 080.62689 37800 3,785 080 190 - Mid-Tex Gas Division Addition 080.62690 37601 17 080 190 - Mid-Tex Gas Division Addition 080.62690 38000 2 080 190 - Mid-Tex Gas Division Addition 080.62691 37602 644 080 190 - Mid-Tex Gas Division Addition 080.62691 38000 138 080 190 - Mid-Tex Gas Division Addition 080.62693 37602 214,954 080 190 - Mid-Tex Gas Division Addition 080.62693 38000 (48,148) 080 190 - Mid-Tex Gas Division Addition 080.62700 37602 28,608 080 190 - Mid-Tex Gas Division Addition 080.62714 37602 81,036 080 190 - Mid-Tex Gas Division Addition 080.62716 37602 3,635 080 190 - Mid-Tex Gas Division Addition 080.62716 38000 909 MTX Additions by FERC Page 32 of 101 430 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.62723 37602 856 080 190 - Mid-Tex Gas Division Addition 080.62723 38000 45 080 190 - Mid-Tex Gas Division Addition 080.62724 37602 913 080 190 - Mid-Tex Gas Division Addition 080.62724 38000 295 080 190 - Mid-Tex Gas Division Addition 080.62726 37602 5,727 080 190 - Mid-Tex Gas Division Addition 080.62726 38000 304 080 190 - Mid-Tex Gas Division Addition 080.62735 37602 226,133 080 190 - Mid-Tex Gas Division Addition 080.62735 38000 56,533 080 190 - Mid-Tex Gas Division Addition 080.62736 37602 5,662 080 190 - Mid-Tex Gas Division Addition 080.62736 38000 1,416 080 190 - Mid-Tex Gas Division Addition 080.62737 37602 1,129 080 190 - Mid-Tex Gas Division Addition 080.62737 37800 3,387 080 190 - Mid-Tex Gas Division Addition 080.62738 37602 87,258 080 190 - Mid-Tex Gas Division Addition 080.62738 38000 881 080 190 - Mid-Tex Gas Division Addition 080.62742 37602 3,449 080 190 - Mid-Tex Gas Division Addition 080.62742 38000 5,395 080 190 - Mid-Tex Gas Division Addition 080.62744 37602 176 080 190 - Mid-Tex Gas Division Addition 080.62744 38000 2 080 190 - Mid-Tex Gas Division Addition 080.62750 37602 - 080 190 - Mid-Tex Gas Division Addition 080.62752 37602 252 080 190 - Mid-Tex Gas Division Addition 080.62753 37601 20,663 080 190 - Mid-Tex Gas Division Addition 080.62753 37800 2,847 080 190 - Mid-Tex Gas Division Addition 080.62756 37800 3 080 190 - Mid-Tex Gas Division Addition 080.62759 37800 1,621 080 190 - Mid-Tex Gas Division Addition 080.62760 37602 15 080 190 - Mid-Tex Gas Division Addition 080.62763 37602 (1) 080 190 - Mid-Tex Gas Division Addition 080.62763 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.62765 37602 30,027 080 190 - Mid-Tex Gas Division Addition 080.62765 38000 4,888 080 190 - Mid-Tex Gas Division Addition 080.62778 37602 50 080 190 - Mid-Tex Gas Division Addition 080.62791 37602 369 080 190 - Mid-Tex Gas Division Addition 080.62791 38000 92 080 190 - Mid-Tex Gas Division Addition 080.62802 37602 2,165 080 190 - Mid-Tex Gas Division Addition 080.62805 37602 3,396 080 190 - Mid-Tex Gas Division Addition 080.62805 38000 602 080 190 - Mid-Tex Gas Division Addition 080.62806 37602 3,382 080 190 - Mid-Tex Gas Division Addition 080.62806 38000 845 080 190 - Mid-Tex Gas Division Addition 080.62812 37602 82 080 190 - Mid-Tex Gas Division Addition 080.62819 37602 2,293 080 190 - Mid-Tex Gas Division Addition 080.62824 37601 0 080 190 - Mid-Tex Gas Division Addition 080.62829 37602 6,717 080 190 - Mid-Tex Gas Division Addition 080.62829 38000 354 080 190 - Mid-Tex Gas Division Addition 080.62833 37602 6,012 080 190 - Mid-Tex Gas Division Addition 080.62834 37602 942 080 190 - Mid-Tex Gas Division Addition 080.62838 37602 2,418 080 190 - Mid-Tex Gas Division Addition 080.62838 38000 806 080 190 - Mid-Tex Gas Division Addition 080.62842 37602 2,791 080 190 - Mid-Tex Gas Division Addition 080.62842 37800 652 080 190 - Mid-Tex Gas Division Addition 080.62842 38000 181 080 190 - Mid-Tex Gas Division Addition 080.62845 37602 5,657 080 190 - Mid-Tex Gas Division Addition 080.62845 38000 613 080 190 - Mid-Tex Gas Division Addition 080.62850 37602 10,958 080 190 - Mid-Tex Gas Division Addition 080.62850 38000 224 080 190 - Mid-Tex Gas Division Addition 080.62866 37602 16 080 190 - Mid-Tex Gas Division Addition 080.62870 37602 1,721 080 190 - Mid-Tex Gas Division Addition 080.62870 38000 191 080 190 - Mid-Tex Gas Division Addition 080.62878 37602 20,568 080 190 - Mid-Tex Gas Division Addition 080.62878 38000 6,856 080 190 - Mid-Tex Gas Division Addition 080.62890 37602 1,323 080 190 - Mid-Tex Gas Division Addition 080.62890 38000 27 080 190 - Mid-Tex Gas Division Addition 080.62893 37602 30 080 190 - Mid-Tex Gas Division Addition 080.62893 38000 3 080 190 - Mid-Tex Gas Division Addition 080.62904 37602 122 080 190 - Mid-Tex Gas Division Addition 080.62917 37602 1,469 080 190 - Mid-Tex Gas Division Addition 080.62917 38000 77 080 190 - Mid-Tex Gas Division Addition 080.62930 37602 1 080 190 - Mid-Tex Gas Division Addition 080.62930 38000 3 080 190 - Mid-Tex Gas Division Addition 080.62950 37601 9,900 080 190 - Mid-Tex Gas Division Addition 080.62952 37602 164 080 190 - Mid-Tex Gas Division Addition 080.62952 38000 29 080 190 - Mid-Tex Gas Division Addition 080.62956 37602 29,764 080 190 - Mid-Tex Gas Division Addition 080.62956 38000 11,021 080 190 - Mid-Tex Gas Division Addition 080.62957 37602 750 080 190 - Mid-Tex Gas Division Addition 080.62957 38000 15 080 190 - Mid-Tex Gas Division Addition 080.62962 37602 424 080 190 - Mid-Tex Gas Division Addition 080.62962 38000 75 080 190 - Mid-Tex Gas Division Addition 080.62980 37601 288 080 190 - Mid-Tex Gas Division Addition 080.62980 37602 1,314 080 190 - Mid-Tex Gas Division Addition 080.62980 37800 3,509 080 190 - Mid-Tex Gas Division Addition 080.62991 37602 144 080 190 - Mid-Tex Gas Division Addition 080.62991 38000 25 080 190 - Mid-Tex Gas Division Addition 080.63002 37602 469 080 190 - Mid-Tex Gas Division Addition 080.63002 38000 103 080 190 - Mid-Tex Gas Division Addition 080.63010 37602 222 080 190 - Mid-Tex Gas Division Addition 080.63011 37602 194 080 190 - Mid-Tex Gas Division Addition 080.63011 37800 48 080 190 - Mid-Tex Gas Division Addition 080.63015 37602 17 080 190 - Mid-Tex Gas Division Addition 080.63015 38000 4 080 190 - Mid-Tex Gas Division Addition 080.63016 37602 5,747 080 190 - Mid-Tex Gas Division Addition 080.63016 38000 239 080 190 - Mid-Tex Gas Division Addition 080.63028 37602 1,330 080 190 - Mid-Tex Gas Division Addition 080.63028 38000 399 080 190 - Mid-Tex Gas Division Addition 080.63033 37602 1,061 080 190 - Mid-Tex Gas Division Addition 080.63038 37600 (5,357) 080 190 - Mid-Tex Gas Division Addition 080.63043 37602 1,157 080 190 - Mid-Tex Gas Division Addition 080.63043 38000 1,166 080 190 - Mid-Tex Gas Division Addition 080.63045 37602 82 080 190 - Mid-Tex Gas Division Addition 080.63048 37602 483 080 190 - Mid-Tex Gas Division Addition 080.63048 38000 54 080 190 - Mid-Tex Gas Division Addition 080.63049 37602 2,162 080 190 - Mid-Tex Gas Division Addition 080.63049 38000 541 080 190 - Mid-Tex Gas Division Addition 080.63053 37602 5 080 190 - Mid-Tex Gas Division Addition 080.63065 37602 866 080 190 - Mid-Tex Gas Division Addition 080.63065 38000 97 080 190 - Mid-Tex Gas Division Addition 080.63069 37602 5,273 080 190 - Mid-Tex Gas Division Addition 080.63069 38000 584 080 190 - Mid-Tex Gas Division Addition 080.63080 37601 6,350 MTX Additions by FERC Page 33 of 101 431 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.63090 37602 213 080 190 - Mid-Tex Gas Division Addition 080.63090 38000 38 080 190 - Mid-Tex Gas Division Addition 080.63091 37602 1,378 080 190 - Mid-Tex Gas Division Addition 080.63091 38000 459 080 190 - Mid-Tex Gas Division Addition 080.63092 37602 191 080 190 - Mid-Tex Gas Division Addition 080.63092 38000 48 080 190 - Mid-Tex Gas Division Addition 080.63097 37602 5,541 080 190 - Mid-Tex Gas Division Addition 080.63100 37601 0 080 190 - Mid-Tex Gas Division Addition 080.63100 37602 4 080 190 - Mid-Tex Gas Division Addition 080.63100 37800 0 080 190 - Mid-Tex Gas Division Addition 080.63109 37601 33 080 190 - Mid-Tex Gas Division Addition 080.63112 37602 269 080 190 - Mid-Tex Gas Division Addition 080.63113 37602 3,319 080 190 - Mid-Tex Gas Division Addition 080.63113 38000 328 080 190 - Mid-Tex Gas Division Addition 080.63135 37602 108,423 080 190 - Mid-Tex Gas Division Addition 080.63135 38000 23,810 080 190 - Mid-Tex Gas Division Addition 080.63150 37602 187,904 080 190 - Mid-Tex Gas Division Addition 080.63150 38000 18,057 080 190 - Mid-Tex Gas Division Addition 080.63155 37602 36,653 080 190 - Mid-Tex Gas Division Addition 080.63155 38000 (977) 080 190 - Mid-Tex Gas Division Addition 080.63156 37602 687 080 190 - Mid-Tex Gas Division Addition 080.63159 37601 343 080 190 - Mid-Tex Gas Division Addition 080.63162 37602 1,126 080 190 - Mid-Tex Gas Division Addition 080.63162 38000 35 080 190 - Mid-Tex Gas Division Addition 080.63163 37602 1,183 080 190 - Mid-Tex Gas Division Addition 080.63164 37602 1,467 080 190 - Mid-Tex Gas Division Addition 080.63170 37601 2 080 190 - Mid-Tex Gas Division Addition 080.63172 37602 1,639 080 190 - Mid-Tex Gas Division Addition 080.63172 37800 105 080 190 - Mid-Tex Gas Division Addition 080.63177 37602 886 080 190 - Mid-Tex Gas Division Addition 080.63180 37602 1,670 080 190 - Mid-Tex Gas Division Addition 080.63180 38000 860 080 190 - Mid-Tex Gas Division Addition 080.63191 37601 2,976 080 190 - Mid-Tex Gas Division Addition 080.63193 37602 - 080 190 - Mid-Tex Gas Division Addition 080.63196 37602 53 080 190 - Mid-Tex Gas Division Addition 080.63198 37602 910 080 190 - Mid-Tex Gas Division Addition 080.63206 37602 505 080 190 - Mid-Tex Gas Division Addition 080.63206 38000 505 080 190 - Mid-Tex Gas Division Addition 080.63207 37602 2,365 080 190 - Mid-Tex Gas Division Addition 080.63212 37601 8,136 080 190 - Mid-Tex Gas Division Addition 080.63213 37602 11,167 080 190 - Mid-Tex Gas Division Addition 080.63213 38000 113 080 190 - Mid-Tex Gas Division Addition 080.63216 37602 122,686 080 190 - Mid-Tex Gas Division Addition 080.63216 38000 1,240 080 190 - Mid-Tex Gas Division Addition 080.63217 37602 807 080 190 - Mid-Tex Gas Division Addition 080.63222 37602 2,918 080 190 - Mid-Tex Gas Division Addition 080.63222 38000 729 080 190 - Mid-Tex Gas Division Addition 080.63232 37602 1,732 080 190 - Mid-Tex Gas Division Addition 080.63232 38000 192 080 190 - Mid-Tex Gas Division Addition 080.63236 37602 1,526 080 190 - Mid-Tex Gas Division Addition 080.63236 38000 31 080 190 - Mid-Tex Gas Division Addition 080.63240 37602 119 080 190 - Mid-Tex Gas Division Addition 080.63241 37602 1,715 080 190 - Mid-Tex Gas Division Addition 080.63241 38000 191 080 190 - Mid-Tex Gas Division Addition 080.63242 37602 1,836 080 190 - Mid-Tex Gas Division Addition 080.63242 38000 204 080 190 - Mid-Tex Gas Division Addition 080.63251 37602 16,038 080 190 - Mid-Tex Gas Division Addition 080.63251 38000 1,024 080 190 - Mid-Tex Gas Division Addition 080.63255 37602 11 080 190 - Mid-Tex Gas Division Addition 080.63256 38000 1,544 080 190 - Mid-Tex Gas Division Addition 080.63257 37800 5 080 190 - Mid-Tex Gas Division Addition 080.63271 37602 1,469 080 190 - Mid-Tex Gas Division Addition 080.63271 38000 45 080 190 - Mid-Tex Gas Division Addition 080.63279 37602 3,758 080 190 - Mid-Tex Gas Division Addition 080.63279 38000 77 080 190 - Mid-Tex Gas Division Addition 080.63284 37602 5,540 080 190 - Mid-Tex Gas Division Addition 080.63284 38000 616 080 190 - Mid-Tex Gas Division Addition 080.63298 37602 3,808 080 190 - Mid-Tex Gas Division Addition 080.63300 37602 859 080 190 - Mid-Tex Gas Division Addition 080.63300 38000 18 080 190 - Mid-Tex Gas Division Addition 080.63309 37602 30,412 080 190 - Mid-Tex Gas Division Addition 080.63312 38000 14,486 080 190 - Mid-Tex Gas Division Addition 080.63321 37602 1,472 080 190 - Mid-Tex Gas Division Addition 080.63321 38000 164 080 190 - Mid-Tex Gas Division Addition 080.63326 37602 13,129 080 190 - Mid-Tex Gas Division Addition 080.63331 37602 9,966 080 190 - Mid-Tex Gas Division Addition 080.63331 38000 1,107 080 190 - Mid-Tex Gas Division Addition 080.63336 37602 2,315 080 190 - Mid-Tex Gas Division Addition 080.63337 37601 138 080 190 - Mid-Tex Gas Division Addition 080.63337 37602 4,477 080 190 - Mid-Tex Gas Division Addition 080.63352 37602 2,783 080 190 - Mid-Tex Gas Division Addition 080.63363 37602 474 080 190 - Mid-Tex Gas Division Addition 080.63363 38000 25 080 190 - Mid-Tex Gas Division Addition 080.63368 37602 41 080 190 - Mid-Tex Gas Division Addition 080.63379 37602 19,203 080 190 - Mid-Tex Gas Division Addition 080.63381 37602 5,206 080 190 - Mid-Tex Gas Division Addition 080.63381 38000 710 080 190 - Mid-Tex Gas Division Addition 080.63389 37602 1,082 080 190 - Mid-Tex Gas Division Addition 080.63389 38000 271 080 190 - Mid-Tex Gas Division Addition 080.63394 37602 768 080 190 - Mid-Tex Gas Division Addition 080.63394 38000 256 080 190 - Mid-Tex Gas Division Addition 080.63398 37602 490 080 190 - Mid-Tex Gas Division Addition 080.63398 38000 54 080 190 - Mid-Tex Gas Division Addition 080.63404 37602 313 080 190 - Mid-Tex Gas Division Addition 080.63404 37800 157 080 190 - Mid-Tex Gas Division Addition 080.63408 37602 406 080 190 - Mid-Tex Gas Division Addition 080.63414 37602 5,175 080 190 - Mid-Tex Gas Division Addition 080.63414 38000 575 080 190 - Mid-Tex Gas Division Addition 080.63428 37602 1,649 080 190 - Mid-Tex Gas Division Addition 080.63428 38000 412 080 190 - Mid-Tex Gas Division Addition 080.63443 37602 145,572 080 190 - Mid-Tex Gas Division Addition 080.63457 37602 1,155 080 190 - Mid-Tex Gas Division Addition 080.63472 37602 265 080 190 - Mid-Tex Gas Division Addition 080.63472 38000 182 080 190 - Mid-Tex Gas Division Addition 080.63476 37800 40 080 190 - Mid-Tex Gas Division Addition 080.63477 37800 0 080 190 - Mid-Tex Gas Division Addition 080.63479 37800 617 MTX Additions by FERC Page 34 of 101 432 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.63487 37601 6,407 080 190 - Mid-Tex Gas Division Addition 080.63492 37602 577 080 190 - Mid-Tex Gas Division Addition 080.63492 38000 247 080 190 - Mid-Tex Gas Division Addition 080.63493 37602 355 080 190 - Mid-Tex Gas Division Addition 080.63493 38000 19 080 190 - Mid-Tex Gas Division Addition 080.63495 37602 2,363 080 190 - Mid-Tex Gas Division Addition 080.63495 38000 1,897 080 190 - Mid-Tex Gas Division Addition 080.63496 37602 694 080 190 - Mid-Tex Gas Division Addition 080.63496 38000 173 080 190 - Mid-Tex Gas Division Addition 080.63502 37602 - 080 190 - Mid-Tex Gas Division Addition 080.63503 37602 4,465 080 190 - Mid-Tex Gas Division Addition 080.63507 37800 (2) 080 190 - Mid-Tex Gas Division Addition 080.63512 37602 10,608 080 190 - Mid-Tex Gas Division Addition 080.63512 38000 7,072 080 190 - Mid-Tex Gas Division Addition 080.63514 37602 1,511 080 190 - Mid-Tex Gas Division Addition 080.63514 38000 504 080 190 - Mid-Tex Gas Division Addition 080.63517 37800 79 080 190 - Mid-Tex Gas Division Addition 080.63519 37602 957 080 190 - Mid-Tex Gas Division Addition 080.63519 38000 169 080 190 - Mid-Tex Gas Division Addition 080.63525 37800 (37) 080 190 - Mid-Tex Gas Division Addition 080.63531 37602 1,015 080 190 - Mid-Tex Gas Division Addition 080.63531 38000 10 080 190 - Mid-Tex Gas Division Addition 080.63533 37602 2,258 080 190 - Mid-Tex Gas Division Addition 080.63533 38000 5,269 080 190 - Mid-Tex Gas Division Addition 080.63544 37602 3,679 080 190 - Mid-Tex Gas Division Addition 080.63544 38000 1,293 080 190 - Mid-Tex Gas Division Addition 080.63546 37602 3,950 080 190 - Mid-Tex Gas Division Addition 080.63546 38000 208 080 190 - Mid-Tex Gas Division Addition 080.63547 37602 27 080 190 - Mid-Tex Gas Division Addition 080.63547 38000 1 080 190 - Mid-Tex Gas Division Addition 080.63548 37602 1,343 080 190 - Mid-Tex Gas Division Addition 080.63548 38000 896 080 190 - Mid-Tex Gas Division Addition 080.63553 37800 (35) 080 190 - Mid-Tex Gas Division Addition 080.63557 37602 264 080 190 - Mid-Tex Gas Division Addition 080.63557 38000 8 080 190 - Mid-Tex Gas Division Addition 080.63570 37800 0 080 190 - Mid-Tex Gas Division Addition 080.63574 37602 2,526 080 190 - Mid-Tex Gas Division Addition 080.63574 38000 281 080 190 - Mid-Tex Gas Division Addition 080.63581 37602 1,516 080 190 - Mid-Tex Gas Division Addition 080.63581 38000 168 080 190 - Mid-Tex Gas Division Addition 080.63586 37602 3,762 080 190 - Mid-Tex Gas Division Addition 080.63586 38000 198 080 190 - Mid-Tex Gas Division Addition 080.63588 37602 430 080 190 - Mid-Tex Gas Division Addition 080.63589 37602 2,787 080 190 - Mid-Tex Gas Division Addition 080.63589 38000 492 080 190 - Mid-Tex Gas Division Addition 080.63590 37602 926 080 190 - Mid-Tex Gas Division Addition 080.63594 37800 2 080 190 - Mid-Tex Gas Division Addition 080.63603 37602 2,524 080 190 - Mid-Tex Gas Division Addition 080.63603 38000 133 080 190 - Mid-Tex Gas Division Addition 080.63606 37602 1,939 080 190 - Mid-Tex Gas Division Addition 080.63607 37602 4,698 080 190 - Mid-Tex Gas Division Addition 080.63607 38000 409 080 190 - Mid-Tex Gas Division Addition 080.63608 37602 702 080 190 - Mid-Tex Gas Division Addition 080.63608 38000 37 080 190 - Mid-Tex Gas Division Addition 080.63609 37600 484 080 190 - Mid-Tex Gas Division Addition 080.63610 37600 793 080 190 - Mid-Tex Gas Division Addition 080.63615 37602 1,371 080 190 - Mid-Tex Gas Division Addition 080.63615 38000 119 080 190 - Mid-Tex Gas Division Addition 080.63616 37602 1,947 080 190 - Mid-Tex Gas Division Addition 080.63616 38000 649 080 190 - Mid-Tex Gas Division Addition 080.63625 37602 335 080 190 - Mid-Tex Gas Division Addition 080.63632 37602 4,743 080 190 - Mid-Tex Gas Division Addition 080.63632 38000 527 080 190 - Mid-Tex Gas Division Addition 080.63644 37601 172,442 080 190 - Mid-Tex Gas Division Addition 080.63644 37800 11,007 080 190 - Mid-Tex Gas Division Addition 080.63646 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.63647 37602 852 080 190 - Mid-Tex Gas Division Addition 080.63647 38000 45 080 190 - Mid-Tex Gas Division Addition 080.63653 37602 1,877 080 190 - Mid-Tex Gas Division Addition 080.63653 38000 209 080 190 - Mid-Tex Gas Division Addition 080.63655 37602 36 080 190 - Mid-Tex Gas Division Addition 080.63674 37602 631 080 190 - Mid-Tex Gas Division Addition 080.63674 38000 210 080 190 - Mid-Tex Gas Division Addition 080.63677 37602 627 080 190 - Mid-Tex Gas Division Addition 080.63677 38000 157 080 190 - Mid-Tex Gas Division Addition 080.63679 37602 1,138 080 190 - Mid-Tex Gas Division Addition 080.63679 38000 285 080 190 - Mid-Tex Gas Division Addition 080.63680 37602 598 080 190 - Mid-Tex Gas Division Addition 080.63698 37800 7 080 190 - Mid-Tex Gas Division Addition 080.63700 37602 1,807 080 190 - Mid-Tex Gas Division Addition 080.63701 37602 2,770 080 190 - Mid-Tex Gas Division Addition 080.63701 38000 1,187 080 190 - Mid-Tex Gas Division Addition 080.63702 37602 12,566 080 190 - Mid-Tex Gas Division Addition 080.63702 38000 5,386 080 190 - Mid-Tex Gas Division Addition 080.63703 37602 19,360 080 190 - Mid-Tex Gas Division Addition 080.63703 38000 4,836 080 190 - Mid-Tex Gas Division Addition 080.63704 37602 9,501 080 190 - Mid-Tex Gas Division Addition 080.63704 38000 1,677 080 190 - Mid-Tex Gas Division Addition 080.63705 37602 2,219 080 190 - Mid-Tex Gas Division Addition 080.63712 37602 830 080 190 - Mid-Tex Gas Division Addition 080.63715 37602 1,952 080 190 - Mid-Tex Gas Division Addition 080.63715 38000 103 080 190 - Mid-Tex Gas Division Addition 080.63717 37602 636 080 190 - Mid-Tex Gas Division Addition 080.63717 38000 159 080 190 - Mid-Tex Gas Division Addition 080.63750 37602 349 080 190 - Mid-Tex Gas Division Addition 080.63750 38000 35 080 190 - Mid-Tex Gas Division Addition 080.63751 37602 4,609 080 190 - Mid-Tex Gas Division Addition 080.63751 38000 347 080 190 - Mid-Tex Gas Division Addition 080.63752 37800 102 080 190 - Mid-Tex Gas Division Addition 080.63753 37601 2 080 190 - Mid-Tex Gas Division Addition 080.63753 38000 34 080 190 - Mid-Tex Gas Division Addition 080.63754 37602 119 080 190 - Mid-Tex Gas Division Addition 080.63754 38000 51 080 190 - Mid-Tex Gas Division Addition 080.63768 37800 4 080 190 - Mid-Tex Gas Division Addition 080.63769 37601 2,932 080 190 - Mid-Tex Gas Division Addition 080.63770 37602 6,327 080 190 - Mid-Tex Gas Division Addition 080.63770 38000 626 MTX Additions by FERC Page 35 of 101 433 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.63772 37800 3 080 190 - Mid-Tex Gas Division Addition 080.63780 37800 7 080 190 - Mid-Tex Gas Division Addition 080.63782 37602 398 080 190 - Mid-Tex Gas Division Addition 080.63783 37602 496 080 190 - Mid-Tex Gas Division Addition 080.63785 37602 606 080 190 - Mid-Tex Gas Division Addition 080.63785 37800 606 080 190 - Mid-Tex Gas Division Addition 080.63788 37602 8,384 080 190 - Mid-Tex Gas Division Addition 080.63788 38000 1,143 080 190 - Mid-Tex Gas Division Addition 080.63790 37602 1,909 080 190 - Mid-Tex Gas Division Addition 080.63810 37602 6,132 080 190 - Mid-Tex Gas Division Addition 080.63831 37602 89,785 080 190 - Mid-Tex Gas Division Addition 080.63831 38000 2,777 080 190 - Mid-Tex Gas Division Addition 080.63850 37602 1,441 080 190 - Mid-Tex Gas Division Addition 080.63850 38000 160 080 190 - Mid-Tex Gas Division Addition 080.63852 37602 3,825 080 190 - Mid-Tex Gas Division Addition 080.63852 38000 425 080 190 - Mid-Tex Gas Division Addition 080.63863 37602 1,404 080 190 - Mid-Tex Gas Division Addition 080.63863 38000 936 080 190 - Mid-Tex Gas Division Addition 080.63877 37602 7,361 080 190 - Mid-Tex Gas Division Addition 080.63877 38000 818 080 190 - Mid-Tex Gas Division Addition 080.63878 37602 4,540 080 190 - Mid-Tex Gas Division Addition 080.63885 37602 1,654 080 190 - Mid-Tex Gas Division Addition 080.63885 37800 709 080 190 - Mid-Tex Gas Division Addition 080.63889 37602 19 080 190 - Mid-Tex Gas Division Addition 080.63901 37602 8,795 080 190 - Mid-Tex Gas Division Addition 080.63901 38000 180 080 190 - Mid-Tex Gas Division Addition 080.63902 37602 1,276 080 190 - Mid-Tex Gas Division Addition 080.63902 38000 547 080 190 - Mid-Tex Gas Division Addition 080.63904 37602 1,472 080 190 - Mid-Tex Gas Division Addition 080.63904 38000 368 080 190 - Mid-Tex Gas Division Addition 080.63906 37602 319 080 190 - Mid-Tex Gas Division Addition 080.63906 38000 35 080 190 - Mid-Tex Gas Division Addition 080.63907 37602 57,582 080 190 - Mid-Tex Gas Division Addition 080.63907 38000 587 080 190 - Mid-Tex Gas Division Addition 080.63911 37602 7,941 080 190 - Mid-Tex Gas Division Addition 080.63911 38000 863 080 190 - Mid-Tex Gas Division Addition 080.63914 37602 2,364 080 190 - Mid-Tex Gas Division Addition 080.63917 37602 1,110 080 190 - Mid-Tex Gas Division Addition 080.63917 38000 84 080 190 - Mid-Tex Gas Division Addition 080.63919 37602 630 080 190 - Mid-Tex Gas Division Addition 080.63919 38000 94 080 190 - Mid-Tex Gas Division Addition 080.63937 37602 261 080 190 - Mid-Tex Gas Division Addition 080.63938 38000 1,319 080 190 - Mid-Tex Gas Division Addition 080.63942 37602 942 080 190 - Mid-Tex Gas Division Addition 080.63942 38000 105 080 190 - Mid-Tex Gas Division Addition 080.63945 37602 448,355 080 190 - Mid-Tex Gas Division Addition 080.63945 37800 616,237 080 190 - Mid-Tex Gas Division Addition 080.63945 38000 56,049 080 190 - Mid-Tex Gas Division Addition 080.63946 37602 2,754 080 190 - Mid-Tex Gas Division Addition 080.63946 38000 489 080 190 - Mid-Tex Gas Division Addition 080.63955 37602 42 080 190 - Mid-Tex Gas Division Addition 080.63955 37800 375 080 190 - Mid-Tex Gas Division Addition 080.63970 37800 1 080 190 - Mid-Tex Gas Division Addition 080.63977 37602 3,074 080 190 - Mid-Tex Gas Division Addition 080.63977 38000 342 080 190 - Mid-Tex Gas Division Addition 080.63978 37602 1,097 080 190 - Mid-Tex Gas Division Addition 080.63978 38000 58 080 190 - Mid-Tex Gas Division Addition 080.63979 37602 894 080 190 - Mid-Tex Gas Division Addition 080.63995 37602 186 080 190 - Mid-Tex Gas Division Addition 080.63995 38000 744 080 190 - Mid-Tex Gas Division Addition 080.64001 37602 200 080 190 - Mid-Tex Gas Division Addition 080.64003 37602 601 080 190 - Mid-Tex Gas Division Addition 080.64003 38000 67 080 190 - Mid-Tex Gas Division Addition 080.64005 37602 728 080 190 - Mid-Tex Gas Division Addition 080.64016 37602 2,114 080 190 - Mid-Tex Gas Division Addition 080.64016 38000 635 080 190 - Mid-Tex Gas Division Addition 080.64025 37602 121,001 080 190 - Mid-Tex Gas Division Addition 080.64025 38000 25,343 080 190 - Mid-Tex Gas Division Addition 080.64026 37602 2,798 080 190 - Mid-Tex Gas Division Addition 080.64026 38000 243 080 190 - Mid-Tex Gas Division Addition 080.64035 37800 7 080 190 - Mid-Tex Gas Division Addition 080.64049 37602 155,093 080 190 - Mid-Tex Gas Division Addition 080.64049 38000 4,831 080 190 - Mid-Tex Gas Division Addition 080.64051 37602 1,821 080 190 - Mid-Tex Gas Division Addition 080.64053 37602 2,590 080 190 - Mid-Tex Gas Division Addition 080.64053 38000 663 080 190 - Mid-Tex Gas Division Addition 080.64070 37602 45 080 190 - Mid-Tex Gas Division Addition 080.64090 37601 18,262 080 190 - Mid-Tex Gas Division Addition 080.64090 37602 106,965 080 190 - Mid-Tex Gas Division Addition 080.64090 38000 5,218 080 190 - Mid-Tex Gas Division Addition 080.64103 37602 (18) 080 190 - Mid-Tex Gas Division Addition 080.64115 38000 219 080 190 - Mid-Tex Gas Division Addition 080.64118 37800 231 080 190 - Mid-Tex Gas Division Addition 080.64122 37602 2,765 080 190 - Mid-Tex Gas Division Addition 080.64128 37602 1,634 080 190 - Mid-Tex Gas Division Addition 080.64128 38000 409 080 190 - Mid-Tex Gas Division Addition 080.64130 37602 156,990 080 190 - Mid-Tex Gas Division Addition 080.64130 38000 17,443 080 190 - Mid-Tex Gas Division Addition 080.64131 37602 129,128 080 190 - Mid-Tex Gas Division Addition 080.64131 38000 21,021 080 190 - Mid-Tex Gas Division Addition 080.64132 37602 11,263 080 190 - Mid-Tex Gas Division Addition 080.64132 38000 1,252 080 190 - Mid-Tex Gas Division Addition 080.64138 37602 115 080 190 - Mid-Tex Gas Division Addition 080.64138 38000 20 080 190 - Mid-Tex Gas Division Addition 080.64139 37602 48,597 080 190 - Mid-Tex Gas Division Addition 080.64141 37602 34,839 080 190 - Mid-Tex Gas Division Addition 080.64141 38000 1,836 080 190 - Mid-Tex Gas Division Addition 080.64144 37602 238 080 190 - Mid-Tex Gas Division Addition 080.64144 38000 59 080 190 - Mid-Tex Gas Division Addition 080.64146 37602 1,366 080 190 - Mid-Tex Gas Division Addition 080.64150 37602 21,054 080 190 - Mid-Tex Gas Division Addition 080.64150 38000 2,338 080 190 - Mid-Tex Gas Division Addition 080.64152 37800 7 080 190 - Mid-Tex Gas Division Addition 080.64154 37602 12,988 080 190 - Mid-Tex Gas Division Addition 080.64155 37602 3,794 080 190 - Mid-Tex Gas Division Addition 080.64157 37602 39,550 080 190 - Mid-Tex Gas Division Addition 080.64158 37602 43,927 MTX Additions by FERC Page 36 of 101 434 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.64159 37602 55,446 080 190 - Mid-Tex Gas Division Addition 080.64163 37602 4,419 080 190 - Mid-Tex Gas Division Addition 080.64163 38000 1,132 080 190 - Mid-Tex Gas Division Addition 080.64168 37800 0 080 190 - Mid-Tex Gas Division Addition 080.64173 37602 95 080 190 - Mid-Tex Gas Division Addition 080.64173 38000 11 080 190 - Mid-Tex Gas Division Addition 080.64175 37602 6,563 080 190 - Mid-Tex Gas Division Addition 080.64175 38000 1,250 080 190 - Mid-Tex Gas Division Addition 080.64185 37602 8,660 080 190 - Mid-Tex Gas Division Addition 080.64186 37602 7,576 080 190 - Mid-Tex Gas Division Addition 080.64193 37800 7 080 190 - Mid-Tex Gas Division Addition 080.64198 37602 1,554 080 190 - Mid-Tex Gas Division Addition 080.64198 38000 274 080 190 - Mid-Tex Gas Division Addition 080.64202 37602 4,409 080 190 - Mid-Tex Gas Division Addition 080.64202 38000 6,614 080 190 - Mid-Tex Gas Division Addition 080.64216 37602 18,943 080 190 - Mid-Tex Gas Division Addition 080.64216 38000 789 080 190 - Mid-Tex Gas Division Addition 080.64234 37602 9,923 080 190 - Mid-Tex Gas Division Addition 080.64247 37602 1,389 080 190 - Mid-Tex Gas Division Addition 080.64247 38000 73 080 190 - Mid-Tex Gas Division Addition 080.64248 37602 883 080 190 - Mid-Tex Gas Division Addition 080.64249 37602 447 080 190 - Mid-Tex Gas Division Addition 080.64249 38000 24 080 190 - Mid-Tex Gas Division Addition 080.64254 38000 947 080 190 - Mid-Tex Gas Division Addition 080.64274 37602 445 080 190 - Mid-Tex Gas Division Addition 080.64295 37602 663 080 190 - Mid-Tex Gas Division Addition 080.64295 37800 589 080 190 - Mid-Tex Gas Division Addition 080.64302 37800 1 080 190 - Mid-Tex Gas Division Addition 080.64303 37602 931 080 190 - Mid-Tex Gas Division Addition 080.64303 38000 19 080 190 - Mid-Tex Gas Division Addition 080.64305 37800 350 080 190 - Mid-Tex Gas Division Addition 080.64309 37800 1 080 190 - Mid-Tex Gas Division Addition 080.64312 37602 1,041 080 190 - Mid-Tex Gas Division Addition 080.64317 37602 1,963 080 190 - Mid-Tex Gas Division Addition 080.64319 37602 1,134 080 190 - Mid-Tex Gas Division Addition 080.64322 37602 247 080 190 - Mid-Tex Gas Division Addition 080.64323 37601 (0) 080 190 - Mid-Tex Gas Division Addition 080.64323 37602 (2) 080 190 - Mid-Tex Gas Division Addition 080.64323 37800 (9) 080 190 - Mid-Tex Gas Division Addition 080.64326 37602 32,803 080 190 - Mid-Tex Gas Division Addition 080.64326 38000 2,859 080 190 - Mid-Tex Gas Division Addition 080.64328 37602 959 080 190 - Mid-Tex Gas Division Addition 080.64328 38000 107 080 190 - Mid-Tex Gas Division Addition 080.64330 38000 18,264 080 190 - Mid-Tex Gas Division Addition 080.64339 37602 433 080 190 - Mid-Tex Gas Division Addition 080.64341 37602 1,139 080 190 - Mid-Tex Gas Division Addition 080.64342 37602 703 080 190 - Mid-Tex Gas Division Addition 080.64342 38000 234 080 190 - Mid-Tex Gas Division Addition 080.64346 37602 84,386 080 190 - Mid-Tex Gas Division Addition 080.64346 38000 (10,705) 080 190 - Mid-Tex Gas Division Addition 080.64366 37601 7,532 080 190 - Mid-Tex Gas Division Addition 080.64366 37602 88,883 080 190 - Mid-Tex Gas Division Addition 080.64366 37800 45,195 080 190 - Mid-Tex Gas Division Addition 080.64366 38000 9,039 080 190 - Mid-Tex Gas Division Addition 080.64376 38000 885 080 190 - Mid-Tex Gas Division Addition 080.64378 37602 (41) 080 190 - Mid-Tex Gas Division Addition 080.64380 37602 333 080 190 - Mid-Tex Gas Division Addition 080.64393 37602 1,827 080 190 - Mid-Tex Gas Division Addition 080.64393 38000 370 080 190 - Mid-Tex Gas Division Addition 080.64395 37602 2,183 080 190 - Mid-Tex Gas Division Addition 080.64395 38000 45 080 190 - Mid-Tex Gas Division Addition 080.64398 37602 30,102 080 190 - Mid-Tex Gas Division Addition 080.64398 38000 1,584 080 190 - Mid-Tex Gas Division Addition 080.64399 37602 973 080 190 - Mid-Tex Gas Division Addition 080.64399 38000 108 080 190 - Mid-Tex Gas Division Addition 080.64400 37602 6,647 080 190 - Mid-Tex Gas Division Addition 080.64400 38000 350 080 190 - Mid-Tex Gas Division Addition 080.64407 37602 36 080 190 - Mid-Tex Gas Division Addition 080.64407 37800 857 080 190 - Mid-Tex Gas Division Addition 080.64410 37601 166 080 190 - Mid-Tex Gas Division Addition 080.64410 38000 4 080 190 - Mid-Tex Gas Division Addition 080.64412 37602 - 080 190 - Mid-Tex Gas Division Addition 080.64414 37601 9,927 080 190 - Mid-Tex Gas Division Addition 080.64416 37602 283 080 190 - Mid-Tex Gas Division Addition 080.64416 37800 525 080 190 - Mid-Tex Gas Division Addition 080.64420 37602 1,234 080 190 - Mid-Tex Gas Division Addition 080.64422 37800 7 080 190 - Mid-Tex Gas Division Addition 080.64423 37800 7 080 190 - Mid-Tex Gas Division Addition 080.64424 37602 1,507 080 190 - Mid-Tex Gas Division Addition 080.64431 37602 3,608 080 190 - Mid-Tex Gas Division Addition 080.64434 38000 2,201 080 190 - Mid-Tex Gas Division Addition 080.64438 37602 37,864 080 190 - Mid-Tex Gas Division Addition 080.64438 38000 4,208 080 190 - Mid-Tex Gas Division Addition 080.64440 37602 262 080 190 - Mid-Tex Gas Division Addition 080.64442 37602 27,341 080 190 - Mid-Tex Gas Division Addition 080.64442 38000 7,712 080 190 - Mid-Tex Gas Division Addition 080.64451 37602 8,920 080 190 - Mid-Tex Gas Division Addition 080.64451 38000 90 080 190 - Mid-Tex Gas Division Addition 080.64467 37602 3,675 080 190 - Mid-Tex Gas Division Addition 080.64467 38000 681 080 190 - Mid-Tex Gas Division Addition 080.64471 37602 4,890 080 190 - Mid-Tex Gas Division Addition 080.64471 38000 550 080 190 - Mid-Tex Gas Division Addition 080.64472 37800 234 080 190 - Mid-Tex Gas Division Addition 080.64474 37800 (8) 080 190 - Mid-Tex Gas Division Addition 080.64487 37602 6,156 080 190 - Mid-Tex Gas Division Addition 080.64487 38000 324 080 190 - Mid-Tex Gas Division Addition 080.64491 37800 1,100 080 190 - Mid-Tex Gas Division Addition 080.64493 37602 406 080 190 - Mid-Tex Gas Division Addition 080.64494 37602 50,673 080 190 - Mid-Tex Gas Division Addition 080.64495 38000 3,240 080 190 - Mid-Tex Gas Division Addition 080.64500 37601 2,533,707 080 190 - Mid-Tex Gas Division Addition 080.64500 37602 1,674,823 080 190 - Mid-Tex Gas Division Addition 080.64500 37800 85,889 080 190 - Mid-Tex Gas Division Addition 080.64506 37602 55 080 190 - Mid-Tex Gas Division Addition 080.64506 38000 9 080 190 - Mid-Tex Gas Division Addition 080.64517 37602 2,545 080 190 - Mid-Tex Gas Division Addition 080.64517 37800 159 MTX Additions by FERC Page 37 of 101 435 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.64517 38000 477 080 190 - Mid-Tex Gas Division Addition 080.64518 37800 0 080 190 - Mid-Tex Gas Division Addition 080.64519 37602 878 080 190 - Mid-Tex Gas Division Addition 080.64519 38000 98 080 190 - Mid-Tex Gas Division Addition 080.64522 37602 40,124 080 190 - Mid-Tex Gas Division Addition 080.64522 38000 1,973 080 190 - Mid-Tex Gas Division Addition 080.64527 37602 510 080 190 - Mid-Tex Gas Division Addition 080.64531 37602 (407,323) 080 190 - Mid-Tex Gas Division Addition 080.64531 38000 (12,598) 080 190 - Mid-Tex Gas Division Addition 080.64540 37601 107,280 080 190 - Mid-Tex Gas Division Addition 080.64540 37800 3,699 080 190 - Mid-Tex Gas Division Addition 080.64541 37601 63,197 080 190 - Mid-Tex Gas Division Addition 080.64541 37800 21,066 080 190 - Mid-Tex Gas Division Addition 080.64546 37602 35,126 080 190 - Mid-Tex Gas Division Addition 080.64546 38000 1,086 080 190 - Mid-Tex Gas Division Addition 080.64551 37800 2,574 080 190 - Mid-Tex Gas Division Addition 080.64553 37601 994 080 190 - Mid-Tex Gas Division Addition 080.64556 37602 1,665 080 190 - Mid-Tex Gas Division Addition 080.64556 38000 165 080 190 - Mid-Tex Gas Division Addition 080.64557 37602 512 080 190 - Mid-Tex Gas Division Addition 080.64558 37602 7,424 080 190 - Mid-Tex Gas Division Addition 080.64558 38000 2,475 080 190 - Mid-Tex Gas Division Addition 080.64559 37602 1,491 080 190 - Mid-Tex Gas Division Addition 080.64559 38000 78 080 190 - Mid-Tex Gas Division Addition 080.64569 37602 40,188 080 190 - Mid-Tex Gas Division Addition 080.64569 38000 4,475 080 190 - Mid-Tex Gas Division Addition 080.64571 37602 1,668 080 190 - Mid-Tex Gas Division Addition 080.64571 38000 52 080 190 - Mid-Tex Gas Division Addition 080.64572 37602 30,268 080 190 - Mid-Tex Gas Division Addition 080.64572 38000 2,596 080 190 - Mid-Tex Gas Division Addition 080.64576 37602 272 080 190 - Mid-Tex Gas Division Addition 080.64579 37602 6,299 080 190 - Mid-Tex Gas Division Addition 080.64579 38000 474 080 190 - Mid-Tex Gas Division Addition 080.64583 37601 6,883 080 190 - Mid-Tex Gas Division Addition 080.64583 37800 142 080 190 - Mid-Tex Gas Division Addition 080.64584 37602 55,044 080 190 - Mid-Tex Gas Division Addition 080.64584 38000 2,897 080 190 - Mid-Tex Gas Division Addition 080.64589 37602 39,330 080 190 - Mid-Tex Gas Division Addition 080.64589 38000 4,370 080 190 - Mid-Tex Gas Division Addition 080.64593 37602 13,930 080 190 - Mid-Tex Gas Division Addition 080.64594 37602 11,084 080 190 - Mid-Tex Gas Division Addition 080.64594 38000 3,695 080 190 - Mid-Tex Gas Division Addition 080.64599 37602 40,511 080 190 - Mid-Tex Gas Division Addition 080.64601 37602 9,932 080 190 - Mid-Tex Gas Division Addition 080.64601 38000 1,917 080 190 - Mid-Tex Gas Division Addition 080.64603 37800 44 080 190 - Mid-Tex Gas Division Addition 080.64604 37601 5,092 080 190 - Mid-Tex Gas Division Addition 080.64604 37800 2,182 080 190 - Mid-Tex Gas Division Addition 080.64606 37800 18 080 190 - Mid-Tex Gas Division Addition 080.64608 37602 57,608 080 190 - Mid-Tex Gas Division Addition 080.64612 37601 1,906 080 190 - Mid-Tex Gas Division Addition 080.64612 38000 59 080 190 - Mid-Tex Gas Division Addition 080.64614 37602 218 080 190 - Mid-Tex Gas Division Addition 080.64629 37602 (580) 080 190 - Mid-Tex Gas Division Addition 080.64630 37602 329 080 190 - Mid-Tex Gas Division Addition 080.64630 38000 17 080 190 - Mid-Tex Gas Division Addition 080.64632 37602 626 080 190 - Mid-Tex Gas Division Addition 080.64633 37602 659 080 190 - Mid-Tex Gas Division Addition 080.64633 38000 116 080 190 - Mid-Tex Gas Division Addition 080.64640 37602 9 080 190 - Mid-Tex Gas Division Addition 080.64647 37602 428 080 190 - Mid-Tex Gas Division Addition 080.64650 37602 886 080 190 - Mid-Tex Gas Division Addition 080.64654 37602 618 080 190 - Mid-Tex Gas Division Addition 080.64654 38000 69 080 190 - Mid-Tex Gas Division Addition 080.64660 37601 6 080 190 - Mid-Tex Gas Division Addition 080.64661 37602 7,073 080 190 - Mid-Tex Gas Division Addition 080.64661 38000 928 080 190 - Mid-Tex Gas Division Addition 080.64662 37602 649 080 190 - Mid-Tex Gas Division Addition 080.64669 37602 829 080 190 - Mid-Tex Gas Division Addition 080.64669 38000 35 080 190 - Mid-Tex Gas Division Addition 080.64680 37602 666 080 190 - Mid-Tex Gas Division Addition 080.64680 38000 234 080 190 - Mid-Tex Gas Division Addition 080.64685 37602 1,176 080 190 - Mid-Tex Gas Division Addition 080.64685 38000 38 080 190 - Mid-Tex Gas Division Addition 080.64688 37602 3,602 080 190 - Mid-Tex Gas Division Addition 080.64688 38000 314 080 190 - Mid-Tex Gas Division Addition 080.64689 37602 581 080 190 - Mid-Tex Gas Division Addition 080.64689 38000 65 080 190 - Mid-Tex Gas Division Addition 080.64691 37602 816 080 190 - Mid-Tex Gas Division Addition 080.64691 38000 91 080 190 - Mid-Tex Gas Division Addition 080.64692 37602 916 080 190 - Mid-Tex Gas Division Addition 080.64692 38000 229 080 190 - Mid-Tex Gas Division Addition 080.64699 37602 394 080 190 - Mid-Tex Gas Division Addition 080.64699 38000 21 080 190 - Mid-Tex Gas Division Addition 080.64703 37602 76,751 080 190 - Mid-Tex Gas Division Addition 080.64703 38000 8,273 080 190 - Mid-Tex Gas Division Addition 080.64712 37800 152 080 190 - Mid-Tex Gas Division Addition 080.64713 37800 8 080 190 - Mid-Tex Gas Division Addition 080.64717 37602 649 080 190 - Mid-Tex Gas Division Addition 080.64719 37602 4,018 080 190 - Mid-Tex Gas Division Addition 080.64719 38000 145 080 190 - Mid-Tex Gas Division Addition 080.64722 37601 3,802 080 190 - Mid-Tex Gas Division Addition 080.64724 37602 99,141 080 190 - Mid-Tex Gas Division Addition 080.64724 38000 5,218 080 190 - Mid-Tex Gas Division Addition 080.64730 37602 1,115 080 190 - Mid-Tex Gas Division Addition 080.64735 37602 802 080 190 - Mid-Tex Gas Division Addition 080.64735 38000 201 080 190 - Mid-Tex Gas Division Addition 080.64739 37800 4,502 080 190 - Mid-Tex Gas Division Addition 080.64740 37602 12,039 080 190 - Mid-Tex Gas Division Addition 080.64740 38000 231 080 190 - Mid-Tex Gas Division Addition 080.64741 37602 799 080 190 - Mid-Tex Gas Division Addition 080.64741 38000 42 080 190 - Mid-Tex Gas Division Addition 080.64750 37602 15,614 080 190 - Mid-Tex Gas Division Addition 080.64750 38000 3,902 080 190 - Mid-Tex Gas Division Addition 080.64769 37602 287 080 190 - Mid-Tex Gas Division Addition 080.64770 37602 1,182 080 190 - Mid-Tex Gas Division Addition 080.64770 38000 62 MTX Additions by FERC Page 38 of 101 436 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.64775 37602 928 080 190 - Mid-Tex Gas Division Addition 080.64775 38000 49 080 190 - Mid-Tex Gas Division Addition 080.64776 37602 1,115 080 190 - Mid-Tex Gas Division Addition 080.64776 38000 197 080 190 - Mid-Tex Gas Division Addition 080.64781 37601 280 080 190 - Mid-Tex Gas Division Addition 080.64781 37602 4,475 080 190 - Mid-Tex Gas Division Addition 080.64781 38000 839 080 190 - Mid-Tex Gas Division Addition 080.64784 37602 1,837 080 190 - Mid-Tex Gas Division Addition 080.64799 37800 9 080 190 - Mid-Tex Gas Division Addition 080.64810 37602 3,873 080 190 - Mid-Tex Gas Division Addition 080.64810 38000 579 080 190 - Mid-Tex Gas Division Addition 080.64825 37601 282,040 080 190 - Mid-Tex Gas Division Addition 080.64825 37800 11,752 080 190 - Mid-Tex Gas Division Addition 080.64826 37602 14,516 080 190 - Mid-Tex Gas Division Addition 080.64826 38000 449 080 190 - Mid-Tex Gas Division Addition 080.64827 37800 575 080 190 - Mid-Tex Gas Division Addition 080.64830 37602 421 080 190 - Mid-Tex Gas Division Addition 080.64834 37602 8,783 080 190 - Mid-Tex Gas Division Addition 080.64834 38000 1,290 080 190 - Mid-Tex Gas Division Addition 080.64838 37601 8,973 080 190 - Mid-Tex Gas Division Addition 080.64843 37602 659 080 190 - Mid-Tex Gas Division Addition 080.64843 38000 20 080 190 - Mid-Tex Gas Division Addition 080.64850 37800 2,917 080 190 - Mid-Tex Gas Division Addition 080.64874 37602 774 080 190 - Mid-Tex Gas Division Addition 080.64876 37602 8,156 080 190 - Mid-Tex Gas Division Addition 080.64876 38000 709 080 190 - Mid-Tex Gas Division Addition 080.64880 37601 19,712 080 190 - Mid-Tex Gas Division Addition 080.64895 37602 113 080 190 - Mid-Tex Gas Division Addition 080.64896 37602 5,095 080 190 - Mid-Tex Gas Division Addition 080.64896 38000 899 080 190 - Mid-Tex Gas Division Addition 080.64898 37602 - 080 190 - Mid-Tex Gas Division Addition 080.64904 37602 1,250 080 190 - Mid-Tex Gas Division Addition 080.64904 38000 313 080 190 - Mid-Tex Gas Division Addition 080.64905 37601 546,644 080 190 - Mid-Tex Gas Division Addition 080.64905 37602 342,692 080 190 - Mid-Tex Gas Division Addition 080.64905 37800 60,902 080 190 - Mid-Tex Gas Division Addition 080.64905 38000 9,791 080 190 - Mid-Tex Gas Division Addition 080.64927 37602 549 080 190 - Mid-Tex Gas Division Addition 080.64930 37602 3,410 080 190 - Mid-Tex Gas Division Addition 080.64930 38000 379 080 190 - Mid-Tex Gas Division Addition 080.64934 37602 698 080 190 - Mid-Tex Gas Division Addition 080.64934 38000 114 080 190 - Mid-Tex Gas Division Addition 080.64935 37601 (1) 080 190 - Mid-Tex Gas Division Addition 080.64937 37602 11,098 080 190 - Mid-Tex Gas Division Addition 080.64937 38000 2,091 080 190 - Mid-Tex Gas Division Addition 080.64940 37602 295 080 190 - Mid-Tex Gas Division Addition 080.64940 38000 6 080 190 - Mid-Tex Gas Division Addition 080.64943 37602 1,705 080 190 - Mid-Tex Gas Division Addition 080.64943 37800 427 080 190 - Mid-Tex Gas Division Addition 080.64944 37602 150 080 190 - Mid-Tex Gas Division Addition 080.64946 37800 2 080 190 - Mid-Tex Gas Division Addition 080.64947 37800 1,956 080 190 - Mid-Tex Gas Division Addition 080.64956 37602 (284,202) 080 190 - Mid-Tex Gas Division Addition 080.64959 37800 (1) 080 190 - Mid-Tex Gas Division Addition 080.64965 37602 953 080 190 - Mid-Tex Gas Division Addition 080.64965 38000 157 080 190 - Mid-Tex Gas Division Addition 080.64966 37602 4,831 080 190 - Mid-Tex Gas Division Addition 080.64966 38000 2,070 080 190 - Mid-Tex Gas Division Addition 080.64967 37602 201 080 190 - Mid-Tex Gas Division Addition 080.64967 38000 144 080 190 - Mid-Tex Gas Division Addition 080.64968 37602 586 080 190 - Mid-Tex Gas Division Addition 080.64968 38000 147 080 190 - Mid-Tex Gas Division Addition 080.64969 37602 5,386 080 190 - Mid-Tex Gas Division Addition 080.64969 38000 950 080 190 - Mid-Tex Gas Division Addition 080.64979 37800 13 080 190 - Mid-Tex Gas Division Addition 080.64983 37602 1,356 080 190 - Mid-Tex Gas Division Addition 080.64983 37800 904 080 190 - Mid-Tex Gas Division Addition 080.64985 37800 5,189 080 190 - Mid-Tex Gas Division Addition 080.64995 37601 257 080 190 - Mid-Tex Gas Division Addition 080.65005 37602 4,231 080 190 - Mid-Tex Gas Division Addition 080.65005 38000 223 080 190 - Mid-Tex Gas Division Addition 080.65008 37602 72,888 080 190 - Mid-Tex Gas Division Addition 080.65008 38000 3,836 080 190 - Mid-Tex Gas Division Addition 080.65015 37602 1,988 080 190 - Mid-Tex Gas Division Addition 080.65015 38000 221 080 190 - Mid-Tex Gas Division Addition 080.65021 37602 796 080 190 - Mid-Tex Gas Division Addition 080.65021 38000 42 080 190 - Mid-Tex Gas Division Addition 080.65027 37800 116 080 190 - Mid-Tex Gas Division Addition 080.65030 37601 164 080 190 - Mid-Tex Gas Division Addition 080.65032 37602 722 080 190 - Mid-Tex Gas Division Addition 080.65037 37602 2,258 080 190 - Mid-Tex Gas Division Addition 080.65037 38000 565 080 190 - Mid-Tex Gas Division Addition 080.65038 37602 247 080 190 - Mid-Tex Gas Division Addition 080.65038 38000 3 080 190 - Mid-Tex Gas Division Addition 080.65049 38000 1,837 080 190 - Mid-Tex Gas Division Addition 080.65061 37602 1,800 080 190 - Mid-Tex Gas Division Addition 080.65061 38000 95 080 190 - Mid-Tex Gas Division Addition 080.65066 37602 388 080 190 - Mid-Tex Gas Division Addition 080.65082 37602 1,492 080 190 - Mid-Tex Gas Division Addition 080.65082 38000 130 080 190 - Mid-Tex Gas Division Addition 080.65103 37601 3,751,202 080 190 - Mid-Tex Gas Division Addition 080.65103 37602 176,643 080 190 - Mid-Tex Gas Division Addition 080.65103 37800 463,694 080 190 - Mid-Tex Gas Division Addition 080.65117 37602 10,640 080 190 - Mid-Tex Gas Division Addition 080.65124 37601 1,180 080 190 - Mid-Tex Gas Division Addition 080.65124 37800 3,256 080 190 - Mid-Tex Gas Division Addition 080.65125 37602 32,903 080 190 - Mid-Tex Gas Division Addition 080.65131 37601 886 080 190 - Mid-Tex Gas Division Addition 080.65136 37602 1,286 080 190 - Mid-Tex Gas Division Addition 080.65136 38000 68 080 190 - Mid-Tex Gas Division Addition 080.65140 37800 1,638 080 190 - Mid-Tex Gas Division Addition 080.65141 37602 1,940 080 190 - Mid-Tex Gas Division Addition 080.65141 38000 169 080 190 - Mid-Tex Gas Division Addition 080.65144 37602 73,372 080 190 - Mid-Tex Gas Division Addition 080.65144 38000 10,972 080 190 - Mid-Tex Gas Division Addition 080.65145 37601 (4) 080 190 - Mid-Tex Gas Division Addition 080.65145 37602 (3) MTX Additions by FERC Page 39 of 101 437 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.65146 37602 2,011 080 190 - Mid-Tex Gas Division Addition 080.65146 38000 106 080 190 - Mid-Tex Gas Division Addition 080.65156 37602 11,945 080 190 - Mid-Tex Gas Division Addition 080.65156 38000 629 080 190 - Mid-Tex Gas Division Addition 080.65158 37602 580 080 190 - Mid-Tex Gas Division Addition 080.65158 38000 145 080 190 - Mid-Tex Gas Division Addition 080.65159 37600 321 080 190 - Mid-Tex Gas Division Addition 080.65159 37602 2,249 080 190 - Mid-Tex Gas Division Addition 080.65159 38000 642 080 190 - Mid-Tex Gas Division Addition 080.65161 37602 1,520 080 190 - Mid-Tex Gas Division Addition 080.65166 37601 5,389 080 190 - Mid-Tex Gas Division Addition 080.65166 37800 12,719 080 190 - Mid-Tex Gas Division Addition 080.65168 38000 21,600 080 190 - Mid-Tex Gas Division Addition 080.65169 37602 17,492 080 190 - Mid-Tex Gas Division Addition 080.65180 37602 82,696 080 190 - Mid-Tex Gas Division Addition 080.65180 38000 15,752 080 190 - Mid-Tex Gas Division Addition 080.65204 37602 6,454 080 190 - Mid-Tex Gas Division Addition 080.65204 38000 1,613 080 190 - Mid-Tex Gas Division Addition 080.65215 37602 829 080 190 - Mid-Tex Gas Division Addition 080.65215 38000 26 080 190 - Mid-Tex Gas Division Addition 080.65223 37602 496 080 190 - Mid-Tex Gas Division Addition 080.65223 38000 165 080 190 - Mid-Tex Gas Division Addition 080.65229 37602 285 080 190 - Mid-Tex Gas Division Addition 080.65242 38000 12,909 080 190 - Mid-Tex Gas Division Addition 080.65247 37602 348 080 190 - Mid-Tex Gas Division Addition 080.65247 38000 18 080 190 - Mid-Tex Gas Division Addition 080.65250 37602 19,333 080 190 - Mid-Tex Gas Division Addition 080.65250 38000 1,681 080 190 - Mid-Tex Gas Division Addition 080.65258 37602 61,173 080 190 - Mid-Tex Gas Division Addition 080.65258 38000 10,795 080 190 - Mid-Tex Gas Division Addition 080.65264 37602 5,098 080 190 - Mid-Tex Gas Division Addition 080.65264 38000 568 080 190 - Mid-Tex Gas Division Addition 080.65269 37602 599 080 190 - Mid-Tex Gas Division Addition 080.65269 38000 67 080 190 - Mid-Tex Gas Division Addition 080.65274 37602 2,110 080 190 - Mid-Tex Gas Division Addition 080.65274 38000 111 080 190 - Mid-Tex Gas Division Addition 080.65275 37602 46,856 080 190 - Mid-Tex Gas Division Addition 080.65275 38000 5,206 080 190 - Mid-Tex Gas Division Addition 080.65287 37602 2,068 080 190 - Mid-Tex Gas Division Addition 080.65287 38000 3,102 080 190 - Mid-Tex Gas Division Addition 080.65294 37601 (48,635) 080 190 - Mid-Tex Gas Division Addition 080.65296 37602 605 080 190 - Mid-Tex Gas Division Addition 080.65296 38000 32 080 190 - Mid-Tex Gas Division Addition 080.65299 37602 13,201 080 190 - Mid-Tex Gas Division Addition 080.65301 37602 1,656 080 190 - Mid-Tex Gas Division Addition 080.65301 38000 185 080 190 - Mid-Tex Gas Division Addition 080.65302 37602 819 080 190 - Mid-Tex Gas Division Addition 080.65302 38000 91 080 190 - Mid-Tex Gas Division Addition 080.65305 37602 7,344 080 190 - Mid-Tex Gas Division Addition 080.65306 37602 1,138 080 190 - Mid-Tex Gas Division Addition 080.65306 38000 156 080 190 - Mid-Tex Gas Division Addition 080.65312 37602 451 080 190 - Mid-Tex Gas Division Addition 080.65323 37602 33,556 080 190 - Mid-Tex Gas Division Addition 080.65324 37602 6,027 080 190 - Mid-Tex Gas Division Addition 080.65324 38000 1,064 080 190 - Mid-Tex Gas Division Addition 080.65325 37602 2,749 080 190 - Mid-Tex Gas Division Addition 080.65325 38000 305 080 190 - Mid-Tex Gas Division Addition 080.65326 37602 1,310 080 190 - Mid-Tex Gas Division Addition 080.65326 38000 69 080 190 - Mid-Tex Gas Division Addition 080.65328 37602 495 080 190 - Mid-Tex Gas Division Addition 080.65328 38000 165 080 190 - Mid-Tex Gas Division Addition 080.65329 37602 1,516 080 190 - Mid-Tex Gas Division Addition 080.65329 38000 379 080 190 - Mid-Tex Gas Division Addition 080.65332 37602 90,286 080 190 - Mid-Tex Gas Division Addition 080.65333 37602 (788) 080 190 - Mid-Tex Gas Division Addition 080.65334 37602 26,185 080 190 - Mid-Tex Gas Division Addition 080.65339 37601 (0) 080 190 - Mid-Tex Gas Division Addition 080.65339 37602 (0) 080 190 - Mid-Tex Gas Division Addition 080.65339 38000 - 080 190 - Mid-Tex Gas Division Addition 080.65340 37602 94 080 190 - Mid-Tex Gas Division Addition 080.65341 37601 (7) 080 190 - Mid-Tex Gas Division Addition 080.65341 37602 (18) 080 190 - Mid-Tex Gas Division Addition 080.65343 37601 (16) 080 190 - Mid-Tex Gas Division Addition 080.65343 38000 (1) 080 190 - Mid-Tex Gas Division Addition 080.65344 37602 427 080 190 - Mid-Tex Gas Division Addition 080.65344 38000 93 080 190 - Mid-Tex Gas Division Addition 080.65347 37800 1,253 080 190 - Mid-Tex Gas Division Addition 080.65356 37601 12,907 080 190 - Mid-Tex Gas Division Addition 080.65359 37602 3,133 080 190 - Mid-Tex Gas Division Addition 080.65361 37602 1,114 080 190 - Mid-Tex Gas Division Addition 080.65361 38000 124 080 190 - Mid-Tex Gas Division Addition 080.65364 37602 204 080 190 - Mid-Tex Gas Division Addition 080.65364 38000 36 080 190 - Mid-Tex Gas Division Addition 080.65367 37602 110,737 080 190 - Mid-Tex Gas Division Addition 080.65367 38000 12,304 080 190 - Mid-Tex Gas Division Addition 080.65368 37601 3,052 080 190 - Mid-Tex Gas Division Addition 080.65368 37602 1,045 080 190 - Mid-Tex Gas Division Addition 080.65368 37800 210 080 190 - Mid-Tex Gas Division Addition 080.65368 38000 149 080 190 - Mid-Tex Gas Division Addition 080.65371 37602 20,167 080 190 - Mid-Tex Gas Division Addition 080.65371 38000 1,061 080 190 - Mid-Tex Gas Division Addition 080.65374 37602 803 080 190 - Mid-Tex Gas Division Addition 080.65380 37800 18 080 190 - Mid-Tex Gas Division Addition 080.65384 37602 4,295 080 190 - Mid-Tex Gas Division Addition 080.65384 38000 699 080 190 - Mid-Tex Gas Division Addition 080.65386 37600 4,945 080 190 - Mid-Tex Gas Division Addition 080.65390 38000 4,482 080 190 - Mid-Tex Gas Division Addition 080.65407 37800 10 080 190 - Mid-Tex Gas Division Addition 080.65415 37602 318 080 190 - Mid-Tex Gas Division Addition 080.65418 37602 28,041 080 190 - Mid-Tex Gas Division Addition 080.65421 37600 409 080 190 - Mid-Tex Gas Division Addition 080.65431 37602 3,879 080 190 - Mid-Tex Gas Division Addition 080.65431 38000 2,586 080 190 - Mid-Tex Gas Division Addition 080.65436 37601 (10) 080 190 - Mid-Tex Gas Division Addition 080.65437 37602 29,440 080 190 - Mid-Tex Gas Division Addition 080.65437 38000 5,195 080 190 - Mid-Tex Gas Division Addition 080.65443 37602 157,367 MTX Additions by FERC Page 40 of 101 438 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.65443 38000 20,449 080 190 - Mid-Tex Gas Division Addition 080.65444 37602 2,244 080 190 - Mid-Tex Gas Division Addition 080.65446 37602 983 080 190 - Mid-Tex Gas Division Addition 080.65446 38000 52 080 190 - Mid-Tex Gas Division Addition 080.65451 37602 399 080 190 - Mid-Tex Gas Division Addition 080.65451 38000 133 080 190 - Mid-Tex Gas Division Addition 080.65457 37602 9,588 080 190 - Mid-Tex Gas Division Addition 080.65461 37602 673 080 190 - Mid-Tex Gas Division Addition 080.65461 38000 67 080 190 - Mid-Tex Gas Division Addition 080.65462 37602 4,413 080 190 - Mid-Tex Gas Division Addition 080.65462 38000 282 080 190 - Mid-Tex Gas Division Addition 080.65473 37602 - 080 190 - Mid-Tex Gas Division Addition 080.65485 37602 3,105 080 190 - Mid-Tex Gas Division Addition 080.65485 38000 1,207 080 190 - Mid-Tex Gas Division Addition 080.65486 37602 85,956 080 190 - Mid-Tex Gas Division Addition 080.65486 38000 21,488 080 190 - Mid-Tex Gas Division Addition 080.65488 37601 0 080 190 - Mid-Tex Gas Division Addition 080.65488 37602 1 080 190 - Mid-Tex Gas Division Addition 080.65488 37800 23 080 190 - Mid-Tex Gas Division Addition 080.65496 37800 (5) 080 190 - Mid-Tex Gas Division Addition 080.65498 37602 26,703 080 190 - Mid-Tex Gas Division Addition 080.65498 38000 554 080 190 - Mid-Tex Gas Division Addition 080.65502 37602 20,391 080 190 - Mid-Tex Gas Division Addition 080.65502 37800 29,301 080 190 - Mid-Tex Gas Division Addition 080.65506 37800 111 080 190 - Mid-Tex Gas Division Addition 080.65508 37800 17 080 190 - Mid-Tex Gas Division Addition 080.65510 37602 214 080 190 - Mid-Tex Gas Division Addition 080.65510 38000 11 080 190 - Mid-Tex Gas Division Addition 080.65511 37601 1,532 080 190 - Mid-Tex Gas Division Addition 080.65514 37602 1,436 080 190 - Mid-Tex Gas Division Addition 080.65514 38000 253 080 190 - Mid-Tex Gas Division Addition 080.65515 37602 10,227 080 190 - Mid-Tex Gas Division Addition 080.65515 37800 11,716 080 190 - Mid-Tex Gas Division Addition 080.65516 37602 1,715 080 190 - Mid-Tex Gas Division Addition 080.65516 37800 857 080 190 - Mid-Tex Gas Division Addition 080.65516 38500 1,715 080 190 - Mid-Tex Gas Division Addition 080.65517 37602 4,875 080 190 - Mid-Tex Gas Division Addition 080.65519 37602 7,244 080 190 - Mid-Tex Gas Division Addition 080.65519 37800 14,961 080 190 - Mid-Tex Gas Division Addition 080.65527 37602 66,172 080 190 - Mid-Tex Gas Division Addition 080.65529 37602 1,531 080 190 - Mid-Tex Gas Division Addition 080.65529 37800 6,125 080 190 - Mid-Tex Gas Division Addition 080.65530 37602 7,586 080 190 - Mid-Tex Gas Division Addition 080.65530 37800 11,379 080 190 - Mid-Tex Gas Division Addition 080.65534 37602 89,056 080 190 - Mid-Tex Gas Division Addition 080.65534 38000 29,680 080 190 - Mid-Tex Gas Division Addition 080.65542 37800 174 080 190 - Mid-Tex Gas Division Addition 080.65545 37602 13,346 080 190 - Mid-Tex Gas Division Addition 080.65546 37602 6,411 080 190 - Mid-Tex Gas Division Addition 080.65548 37602 241 080 190 - Mid-Tex Gas Division Addition 080.65548 38000 145 080 190 - Mid-Tex Gas Division Addition 080.65551 37601 38 080 190 - Mid-Tex Gas Division Addition 080.65551 37602 3,384 080 190 - Mid-Tex Gas Division Addition 080.65551 38000 380 080 190 - Mid-Tex Gas Division Addition 080.65558 37800 (19,718) 080 190 - Mid-Tex Gas Division Addition 080.65563 37602 533 080 190 - Mid-Tex Gas Division Addition 080.65564 37602 35,298 080 190 - Mid-Tex Gas Division Addition 080.65564 38000 8,830 080 190 - Mid-Tex Gas Division Addition 080.65565 37602 185,769 080 190 - Mid-Tex Gas Division Addition 080.65565 38000 17,225 080 190 - Mid-Tex Gas Division Addition 080.65570 37601 2,200 080 190 - Mid-Tex Gas Division Addition 080.65582 37602 14 080 190 - Mid-Tex Gas Division Addition 080.65588 37800 134 080 190 - Mid-Tex Gas Division Addition 080.65588 38000 21 080 190 - Mid-Tex Gas Division Addition 080.65593 37601 34,468 080 190 - Mid-Tex Gas Division Addition 080.65593 37602 7,051 080 190 - Mid-Tex Gas Division Addition 080.65593 37800 9,723 080 190 - Mid-Tex Gas Division Addition 080.65620 37602 3,848 080 190 - Mid-Tex Gas Division Addition 080.65621 37601 7,390 080 190 - Mid-Tex Gas Division Addition 080.65627 37602 6,635 080 190 - Mid-Tex Gas Division Addition 080.65627 37800 7,583 080 190 - Mid-Tex Gas Division Addition 080.65627 38000 1,580 080 190 - Mid-Tex Gas Division Addition 080.65642 37602 6,173 080 190 - Mid-Tex Gas Division Addition 080.65642 37800 5,051 080 190 - Mid-Tex Gas Division Addition 080.65644 37602 20,165 080 190 - Mid-Tex Gas Division Addition 080.65646 37602 29,339 080 190 - Mid-Tex Gas Division Addition 080.65646 38000 1,544 080 190 - Mid-Tex Gas Division Addition 080.65647 37602 1,882 080 190 - Mid-Tex Gas Division Addition 080.65647 37800 3,765 080 190 - Mid-Tex Gas Division Addition 080.65647 38000 627 080 190 - Mid-Tex Gas Division Addition 080.65651 37602 3,910 080 190 - Mid-Tex Gas Division Addition 080.65651 37800 690 080 190 - Mid-Tex Gas Division Addition 080.65653 37602 3,937 080 190 - Mid-Tex Gas Division Addition 080.65653 37800 5,921 080 190 - Mid-Tex Gas Division Addition 080.65655 37601 642 080 190 - Mid-Tex Gas Division Addition 080.65655 37602 1,444 080 190 - Mid-Tex Gas Division Addition 080.65655 37800 13,963 080 190 - Mid-Tex Gas Division Addition 080.65657 37602 1,147 080 190 - Mid-Tex Gas Division Addition 080.65659 37602 508 080 190 - Mid-Tex Gas Division Addition 080.65660 37602 32 080 190 - Mid-Tex Gas Division Addition 080.65661 37602 54,395 080 190 - Mid-Tex Gas Division Addition 080.65661 38000 31,753 080 190 - Mid-Tex Gas Division Addition 080.65672 37602 704 080 190 - Mid-Tex Gas Division Addition 080.65672 38000 7 080 190 - Mid-Tex Gas Division Addition 080.65673 37602 211 080 190 - Mid-Tex Gas Division Addition 080.65674 37601 49,321 080 190 - Mid-Tex Gas Division Addition 080.65674 37602 98,642 080 190 - Mid-Tex Gas Division Addition 080.65674 37800 98,642 080 190 - Mid-Tex Gas Division Addition 080.65678 37602 7,162 080 190 - Mid-Tex Gas Division Addition 080.65678 37800 298 080 190 - Mid-Tex Gas Division Addition 080.65679 37602 7,613 080 190 - Mid-Tex Gas Division Addition 080.65679 37800 7,897 080 190 - Mid-Tex Gas Division Addition 080.65679 38000 310 080 190 - Mid-Tex Gas Division Addition 080.65681 37601 42,718 080 190 - Mid-Tex Gas Division Addition 080.65681 37602 10,680 080 190 - Mid-Tex Gas Division Addition 080.65682 37800 35 080 190 - Mid-Tex Gas Division Addition 080.65683 37602 648 MTX Additions by FERC Page 41 of 101 439 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.65683 38000 72 080 190 - Mid-Tex Gas Division Addition 080.65690 37602 4,206 080 190 - Mid-Tex Gas Division Addition 080.65690 37800 3,444 080 190 - Mid-Tex Gas Division Addition 080.65694 37602 2,691 080 190 - Mid-Tex Gas Division Addition 080.65694 38000 55 080 190 - Mid-Tex Gas Division Addition 080.65695 37602 2,892 080 190 - Mid-Tex Gas Division Addition 080.65697 37601 (8,556) 080 190 - Mid-Tex Gas Division Addition 080.65704 37602 282,022 080 190 - Mid-Tex Gas Division Addition 080.65704 37800 188,015 080 190 - Mid-Tex Gas Division Addition 080.65704 38000 24,739 080 190 - Mid-Tex Gas Division Addition 080.65705 37602 193 080 190 - Mid-Tex Gas Division Addition 080.65705 38000 10 080 190 - Mid-Tex Gas Division Addition 080.65706 37602 13,575 080 190 - Mid-Tex Gas Division Addition 080.65707 37601 2,041 080 190 - Mid-Tex Gas Division Addition 080.65707 37602 100,022 080 190 - Mid-Tex Gas Division Addition 080.65731 37602 264 080 190 - Mid-Tex Gas Division Addition 080.65731 38000 3 080 190 - Mid-Tex Gas Division Addition 080.65744 37602 346,968 080 190 - Mid-Tex Gas Division Addition 080.65744 37800 520,381 080 190 - Mid-Tex Gas Division Addition 080.65747 37602 5,997 080 190 - Mid-Tex Gas Division Addition 080.65747 38000 6 080 190 - Mid-Tex Gas Division Addition 080.65749 37602 45,461 080 190 - Mid-Tex Gas Division Addition 080.65749 38000 1,923 080 190 - Mid-Tex Gas Division Addition 080.65754 37602 10,087 080 190 - Mid-Tex Gas Division Addition 080.65754 38000 531 080 190 - Mid-Tex Gas Division Addition 080.65774 37602 409 080 190 - Mid-Tex Gas Division Addition 080.65779 37602 1,736 080 190 - Mid-Tex Gas Division Addition 080.65786 37602 232 080 190 - Mid-Tex Gas Division Addition 080.65787 37602 8,169 080 190 - Mid-Tex Gas Division Addition 080.65795 37602 111,422 080 190 - Mid-Tex Gas Division Addition 080.65795 38000 27,855 080 190 - Mid-Tex Gas Division Addition 080.65802 37602 7,593 080 190 - Mid-Tex Gas Division Addition 080.65802 37800 17,716 080 190 - Mid-Tex Gas Division Addition 080.65803 37601 1,476 080 190 - Mid-Tex Gas Division Addition 080.65803 37602 4,849 080 190 - Mid-Tex Gas Division Addition 080.65803 37800 (27) 080 190 - Mid-Tex Gas Division Addition 080.65804 37602 40,879 080 190 - Mid-Tex Gas Division Addition 080.65804 37800 10,220 080 190 - Mid-Tex Gas Division Addition 080.65805 37602 269,889 080 190 - Mid-Tex Gas Division Addition 080.65805 37800 179,926 080 190 - Mid-Tex Gas Division Addition 080.65806 37800 12,122 080 190 - Mid-Tex Gas Division Addition 080.65807 37602 13,654 080 190 - Mid-Tex Gas Division Addition 080.65807 37800 31,859 080 190 - Mid-Tex Gas Division Addition 080.65810 37800 23,688 080 190 - Mid-Tex Gas Division Addition 080.65812 37800 14,176 080 190 - Mid-Tex Gas Division Addition 080.65813 37602 3,555 080 190 - Mid-Tex Gas Division Addition 080.65813 37800 5,332 080 190 - Mid-Tex Gas Division Addition 080.65815 37602 2,831 080 190 - Mid-Tex Gas Division Addition 080.65815 37800 4,247 080 190 - Mid-Tex Gas Division Addition 080.65815 38000 472 080 190 - Mid-Tex Gas Division Addition 080.65816 37601 518 080 190 - Mid-Tex Gas Division Addition 080.65816 37602 4,142 080 190 - Mid-Tex Gas Division Addition 080.65816 37800 21,226 080 190 - Mid-Tex Gas Division Addition 080.65817 37602 3,192 080 190 - Mid-Tex Gas Division Addition 080.65817 37800 9,577 080 190 - Mid-Tex Gas Division Addition 080.65818 37800 19,858 080 190 - Mid-Tex Gas Division Addition 080.65819 37800 14,340 080 190 - Mid-Tex Gas Division Addition 080.65820 37601 1,377 080 190 - Mid-Tex Gas Division Addition 080.65820 37602 14,458 080 190 - Mid-Tex Gas Division Addition 080.65820 37800 53,012 080 190 - Mid-Tex Gas Division Addition 080.65821 37602 251,328 080 190 - Mid-Tex Gas Division Addition 080.65821 37800 44,352 080 190 - Mid-Tex Gas Division Addition 080.65825 37602 9,691 080 190 - Mid-Tex Gas Division Addition 080.65826 37602 80,961 080 190 - Mid-Tex Gas Division Addition 080.65826 38000 26,987 080 190 - Mid-Tex Gas Division Addition 080.65829 37602 11,755 080 190 - Mid-Tex Gas Division Addition 080.65829 38000 619 080 190 - Mid-Tex Gas Division Addition 080.65830 37602 481 080 190 - Mid-Tex Gas Division Addition 080.65838 37602 2,974 080 190 - Mid-Tex Gas Division Addition 080.65838 38000 1,157 080 190 - Mid-Tex Gas Division Addition 080.65840 37602 - 080 190 - Mid-Tex Gas Division Addition 080.65841 37602 1,220 080 190 - Mid-Tex Gas Division Addition 080.65841 37800 4,880 080 190 - Mid-Tex Gas Division Addition 080.65842 37602 140,648 080 190 - Mid-Tex Gas Division Addition 080.65842 37800 211,197 080 190 - Mid-Tex Gas Division Addition 080.65844 37602 2,533 080 190 - Mid-Tex Gas Division Addition 080.65844 37800 7,599 080 190 - Mid-Tex Gas Division Addition 080.65845 37602 1,488 080 190 - Mid-Tex Gas Division Addition 080.65851 37602 106,327 080 190 - Mid-Tex Gas Division Addition 080.65851 38000 11,814 080 190 - Mid-Tex Gas Division Addition 080.65852 37602 1,605 080 190 - Mid-Tex Gas Division Addition 080.65852 37800 290 080 190 - Mid-Tex Gas Division Addition 080.65853 37800 6,736 080 190 - Mid-Tex Gas Division Addition 080.65854 37800 5,976 080 190 - Mid-Tex Gas Division Addition 080.65857 37602 11,764 080 190 - Mid-Tex Gas Division Addition 080.65857 37800 1,759 080 190 - Mid-Tex Gas Division Addition 080.65858 37602 108,644 080 190 - Mid-Tex Gas Division Addition 080.65858 37800 407,413 080 190 - Mid-Tex Gas Division Addition 080.65858 38000 27,161 080 190 - Mid-Tex Gas Division Addition 080.65859 37602 546 080 190 - Mid-Tex Gas Division Addition 080.65859 38000 6 080 190 - Mid-Tex Gas Division Addition 080.65862 37602 131,327 080 190 - Mid-Tex Gas Division Addition 080.65862 37800 367,716 080 190 - Mid-Tex Gas Division Addition 080.65862 38000 26,265 080 190 - Mid-Tex Gas Division Addition 080.65863 37602 3,517 080 190 - Mid-Tex Gas Division Addition 080.65863 37800 11,773 080 190 - Mid-Tex Gas Division Addition 080.65865 37601 17,505 080 190 - Mid-Tex Gas Division Addition 080.65865 37602 131,291 080 190 - Mid-Tex Gas Division Addition 080.65865 37800 26,258 080 190 - Mid-Tex Gas Division Addition 080.65877 37800 48 080 190 - Mid-Tex Gas Division Addition 080.65879 37602 73,586 080 190 - Mid-Tex Gas Division Addition 080.65879 38000 8,176 080 190 - Mid-Tex Gas Division Addition 080.65885 37601 6,482 080 190 - Mid-Tex Gas Division Addition 080.65885 37602 86,429 080 190 - Mid-Tex Gas Division Addition 080.65885 37800 35,332 080 190 - Mid-Tex Gas Division Addition 080.65887 37602 6,510 080 190 - Mid-Tex Gas Division Addition 080.65887 38000 343 MTX Additions by FERC Page 42 of 101 440 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.65896 37601 129 080 190 - Mid-Tex Gas Division Addition 080.65896 37800 975 080 190 - Mid-Tex Gas Division Addition 080.65896 38000 101 080 190 - Mid-Tex Gas Division Addition 080.65901 37602 10,362 080 190 - Mid-Tex Gas Division Addition 080.65901 38000 4,335 080 190 - Mid-Tex Gas Division Addition 080.65902 37602 13,090 080 190 - Mid-Tex Gas Division Addition 080.65902 38000 9,059 080 190 - Mid-Tex Gas Division Addition 080.65904 37602 654 080 190 - Mid-Tex Gas Division Addition 080.65910 37602 1,397 080 190 - Mid-Tex Gas Division Addition 080.65910 38000 155 080 190 - Mid-Tex Gas Division Addition 080.65917 37602 358 080 190 - Mid-Tex Gas Division Addition 080.65918 37602 9,553 080 190 - Mid-Tex Gas Division Addition 080.65918 38000 198 080 190 - Mid-Tex Gas Division Addition 080.65919 37602 12,716 080 190 - Mid-Tex Gas Division Addition 080.65921 37602 12,740 080 190 - Mid-Tex Gas Division Addition 080.65921 38000 2,248 080 190 - Mid-Tex Gas Division Addition 080.65930 37602 1,366 080 190 - Mid-Tex Gas Division Addition 080.65930 38000 72 080 190 - Mid-Tex Gas Division Addition 080.65955 37800 215 080 190 - Mid-Tex Gas Division Addition 080.65956 37602 39,040 080 190 - Mid-Tex Gas Division Addition 080.65956 38000 3,395 080 190 - Mid-Tex Gas Division Addition 080.65962 37601 455 080 190 - Mid-Tex Gas Division Addition 080.65968 37602 78,409 080 190 - Mid-Tex Gas Division Addition 080.65973 37602 38,714 080 190 - Mid-Tex Gas Division Addition 080.66000 37602 17,136 080 190 - Mid-Tex Gas Division Addition 080.66002 37602 14,312 080 190 - Mid-Tex Gas Division Addition 080.66007 37602 416 080 190 - Mid-Tex Gas Division Addition 080.66011 37602 1,832 080 190 - Mid-Tex Gas Division Addition 080.66011 38000 96 080 190 - Mid-Tex Gas Division Addition 080.66012 37800 4,770 080 190 - Mid-Tex Gas Division Addition 080.66014 37602 1,776 080 190 - Mid-Tex Gas Division Addition 080.66016 37601 632 080 190 - Mid-Tex Gas Division Addition 080.66017 37602 4,513 080 190 - Mid-Tex Gas Division Addition 080.66017 38000 340 080 190 - Mid-Tex Gas Division Addition 080.66023 37602 1,649 080 190 - Mid-Tex Gas Division Addition 080.66023 38000 87 080 190 - Mid-Tex Gas Division Addition 080.66029 37602 2,509 080 190 - Mid-Tex Gas Division Addition 080.66029 38000 279 080 190 - Mid-Tex Gas Division Addition 080.66030 37602 5,404 080 190 - Mid-Tex Gas Division Addition 080.66030 38000 285 080 190 - Mid-Tex Gas Division Addition 080.66031 37602 1,514 080 190 - Mid-Tex Gas Division Addition 080.66032 37602 5,935 080 190 - Mid-Tex Gas Division Addition 080.66034 37602 19,497 080 190 - Mid-Tex Gas Division Addition 080.66035 37800 1,069 080 190 - Mid-Tex Gas Division Addition 080.66037 37601 13,305 080 190 - Mid-Tex Gas Division Addition 080.66038 37602 3,570 080 190 - Mid-Tex Gas Division Addition 080.66038 38000 188 080 190 - Mid-Tex Gas Division Addition 080.66041 37602 25,676 080 190 - Mid-Tex Gas Division Addition 080.66041 38000 2,853 080 190 - Mid-Tex Gas Division Addition 080.66044 37601 500,164 080 190 - Mid-Tex Gas Division Addition 080.66058 37602 13,147 080 190 - Mid-Tex Gas Division Addition 080.66058 38000 5,636 080 190 - Mid-Tex Gas Division Addition 080.66071 37601 19,039 080 190 - Mid-Tex Gas Division Addition 080.66083 37602 307 080 190 - Mid-Tex Gas Division Addition 080.66107 37602 1,328 080 190 - Mid-Tex Gas Division Addition 080.66107 38000 55 080 190 - Mid-Tex Gas Division Addition 080.66110 37602 28,331 080 190 - Mid-Tex Gas Division Addition 080.66110 38000 28,349 080 190 - Mid-Tex Gas Division Addition 080.66113 37602 36,771 080 190 - Mid-Tex Gas Division Addition 080.66113 38000 9,218 080 190 - Mid-Tex Gas Division Addition 080.66125 37602 3,336 080 190 - Mid-Tex Gas Division Addition 080.66126 37602 - 080 190 - Mid-Tex Gas Division Addition 080.66131 38000 4,650 080 190 - Mid-Tex Gas Division Addition 080.66135 37602 448 080 190 - Mid-Tex Gas Division Addition 080.66135 38000 50 080 190 - Mid-Tex Gas Division Addition 080.66142 37602 772 080 190 - Mid-Tex Gas Division Addition 080.66142 38000 86 080 190 - Mid-Tex Gas Division Addition 080.66155 37602 43,957 080 190 - Mid-Tex Gas Division Addition 080.66157 37602 164 080 190 - Mid-Tex Gas Division Addition 080.66157 38000 9 080 190 - Mid-Tex Gas Division Addition 080.66172 37602 3,026 080 190 - Mid-Tex Gas Division Addition 080.66172 38000 336 080 190 - Mid-Tex Gas Division Addition 080.66179 37602 3,885 080 190 - Mid-Tex Gas Division Addition 080.66181 37602 21,380 080 190 - Mid-Tex Gas Division Addition 080.66181 38000 1,125 080 190 - Mid-Tex Gas Division Addition 080.66186 37800 213 080 190 - Mid-Tex Gas Division Addition 080.66209 37601 53,484 080 190 - Mid-Tex Gas Division Addition 080.66212 37602 13,031 080 190 - Mid-Tex Gas Division Addition 080.66212 37800 13,031 080 190 - Mid-Tex Gas Division Addition 080.66212 38000 1,086 080 190 - Mid-Tex Gas Division Addition 080.66213 37601 3,369 080 190 - Mid-Tex Gas Division Addition 080.66213 37602 3,369 080 190 - Mid-Tex Gas Division Addition 080.66213 37800 9,332 080 190 - Mid-Tex Gas Division Addition 080.66214 37602 3 080 190 - Mid-Tex Gas Division Addition 080.66214 38000 25 080 190 - Mid-Tex Gas Division Addition 080.66216 37602 1,150 080 190 - Mid-Tex Gas Division Addition 080.66216 38000 61 080 190 - Mid-Tex Gas Division Addition 080.66217 37602 336 080 190 - Mid-Tex Gas Division Addition 080.66218 37602 486 080 190 - Mid-Tex Gas Division Addition 080.66223 37602 271 080 190 - Mid-Tex Gas Division Addition 080.66223 38000 14 080 190 - Mid-Tex Gas Division Addition 080.66224 37602 7,776 080 190 - Mid-Tex Gas Division Addition 080.66224 38000 409 080 190 - Mid-Tex Gas Division Addition 080.66229 37602 3,789 080 190 - Mid-Tex Gas Division Addition 080.66233 37601 2,467 080 190 - Mid-Tex Gas Division Addition 080.66238 37602 243 080 190 - Mid-Tex Gas Division Addition 080.66244 37602 414 080 190 - Mid-Tex Gas Division Addition 080.66250 37800 290 080 190 - Mid-Tex Gas Division Addition 080.66252 37602 232 080 190 - Mid-Tex Gas Division Addition 080.66252 38000 12 080 190 - Mid-Tex Gas Division Addition 080.66258 37800 48 080 190 - Mid-Tex Gas Division Addition 080.66261 37800 50 080 190 - Mid-Tex Gas Division Addition 080.66262 37602 197,665 080 190 - Mid-Tex Gas Division Addition 080.66262 38000 21,963 080 190 - Mid-Tex Gas Division Addition 080.66272 37601 172 080 190 - Mid-Tex Gas Division Addition 080.66272 37602 15 080 190 - Mid-Tex Gas Division Addition 080.66273 37602 11,074 MTX Additions by FERC Page 43 of 101 441 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.66273 38000 2,768 080 190 - Mid-Tex Gas Division Addition 080.66274 37602 33,405 080 190 - Mid-Tex Gas Division Addition 080.66274 38000 14,317 080 190 - Mid-Tex Gas Division Addition 080.66275 37602 6,831 080 190 - Mid-Tex Gas Division Addition 080.66275 38000 594 080 190 - Mid-Tex Gas Division Addition 080.66277 37800 48 080 190 - Mid-Tex Gas Division Addition 080.66279 37602 8,082 080 190 - Mid-Tex Gas Division Addition 080.66284 37800 3,084 080 190 - Mid-Tex Gas Division Addition 080.66295 37602 12,797 080 190 - Mid-Tex Gas Division Addition 080.66297 37602 959 080 190 - Mid-Tex Gas Division Addition 080.66298 37602 36,916 080 190 - Mid-Tex Gas Division Addition 080.66298 38000 4,102 080 190 - Mid-Tex Gas Division Addition 080.66299 37602 4,487 080 190 - Mid-Tex Gas Division Addition 080.66299 38000 139 080 190 - Mid-Tex Gas Division Addition 080.66301 37602 69,451 080 190 - Mid-Tex Gas Division Addition 080.66301 38000 12,259 080 190 - Mid-Tex Gas Division Addition 080.66302 37602 84 080 190 - Mid-Tex Gas Division Addition 080.66305 37602 - 080 190 - Mid-Tex Gas Division Addition 080.66312 37602 (2,649) 080 190 - Mid-Tex Gas Division Addition 080.66328 37800 299 080 190 - Mid-Tex Gas Division Addition 080.66330 37602 103,351 080 190 - Mid-Tex Gas Division Addition 080.66338 37602 71,615 080 190 - Mid-Tex Gas Division Addition 080.66338 38000 3,768 080 190 - Mid-Tex Gas Division Addition 080.66373 37601 111,190 080 190 - Mid-Tex Gas Division Addition 080.66376 37602 2,955 080 190 - Mid-Tex Gas Division Addition 080.66376 38000 155 080 190 - Mid-Tex Gas Division Addition 080.66384 37601 27,703 080 190 - Mid-Tex Gas Division Addition 080.66391 37800 501 080 190 - Mid-Tex Gas Division Addition 080.66392 37602 78,597 080 190 - Mid-Tex Gas Division Addition 080.66392 38000 4,137 080 190 - Mid-Tex Gas Division Addition 080.66395 37602 13,534 080 190 - Mid-Tex Gas Division Addition 080.66398 37602 160 080 190 - Mid-Tex Gas Division Addition 080.66398 38000 8 080 190 - Mid-Tex Gas Division Addition 080.66403 37602 3,823 080 190 - Mid-Tex Gas Division Addition 080.66403 38000 244 080 190 - Mid-Tex Gas Division Addition 080.66430 37602 11,425 080 190 - Mid-Tex Gas Division Addition 080.66447 37602 28,613 080 190 - Mid-Tex Gas Division Addition 080.66447 38000 5,049 080 190 - Mid-Tex Gas Division Addition 080.66462 37602 1,089 080 190 - Mid-Tex Gas Division Addition 080.66463 37800 53 080 190 - Mid-Tex Gas Division Addition 080.66479 37602 35,635 080 190 - Mid-Tex Gas Division Addition 080.66479 38000 727 080 190 - Mid-Tex Gas Division Addition 080.66490 37601 13 080 190 - Mid-Tex Gas Division Addition 080.66490 37602 28 080 190 - Mid-Tex Gas Division Addition 080.66490 38000 0 080 190 - Mid-Tex Gas Division Addition 080.66508 37602 54,554 080 190 - Mid-Tex Gas Division Addition 080.66508 37800 5,320 080 190 - Mid-Tex Gas Division Addition 080.66508 38000 6,650 080 190 - Mid-Tex Gas Division Addition 080.66510 37602 1,716 080 190 - Mid-Tex Gas Division Addition 080.66510 38000 191 080 190 - Mid-Tex Gas Division Addition 080.66557 37601 695,368 080 190 - Mid-Tex Gas Division Addition 080.66563 37602 15,079 080 190 - Mid-Tex Gas Division Addition 080.66563 38000 794 080 190 - Mid-Tex Gas Division Addition 080.66564 37602 7,738 080 190 - Mid-Tex Gas Division Addition 080.66564 37800 6,190 080 190 - Mid-Tex Gas Division Addition 080.66581 37602 3,674 080 190 - Mid-Tex Gas Division Addition 080.66581 37800 8,571 080 190 - Mid-Tex Gas Division Addition 080.66582 37601 5,123 080 190 - Mid-Tex Gas Division Addition 080.66583 37601 18,863 080 190 - Mid-Tex Gas Division Addition 080.66583 38000 38,563 080 190 - Mid-Tex Gas Division Addition 080.66584 37601 21,149 080 190 - Mid-Tex Gas Division Addition 080.66586 37602 9,963 080 190 - Mid-Tex Gas Division Addition 080.66586 37800 14,944 080 190 - Mid-Tex Gas Division Addition 080.66597 37602 1,507 080 190 - Mid-Tex Gas Division Addition 080.66597 38000 47 080 190 - Mid-Tex Gas Division Addition 080.66605 37602 1,566 080 190 - Mid-Tex Gas Division Addition 080.66605 38000 82 080 190 - Mid-Tex Gas Division Addition 080.66610 37602 548 080 190 - Mid-Tex Gas Division Addition 080.66629 37602 19,558 080 190 - Mid-Tex Gas Division Addition 080.66629 37800 28,358 080 190 - Mid-Tex Gas Division Addition 080.66629 38000 978 080 190 - Mid-Tex Gas Division Addition 080.66639 37602 12,043 080 190 - Mid-Tex Gas Division Addition 080.66639 38000 61 080 190 - Mid-Tex Gas Division Addition 080.66650 37602 9,800 080 190 - Mid-Tex Gas Division Addition 080.66650 37800 24,499 080 190 - Mid-Tex Gas Division Addition 080.66650 38000 700 080 190 - Mid-Tex Gas Division Addition 080.66651 37600 1,649 080 190 - Mid-Tex Gas Division Addition 080.66653 37602 310 080 190 - Mid-Tex Gas Division Addition 080.66654 37602 28,522 080 190 - Mid-Tex Gas Division Addition 080.66654 37800 22,818 080 190 - Mid-Tex Gas Division Addition 080.66654 38000 5,704 080 190 - Mid-Tex Gas Division Addition 080.66655 37602 2,514 080 190 - Mid-Tex Gas Division Addition 080.66655 38000 279 080 190 - Mid-Tex Gas Division Addition 080.66656 37602 12,342 080 190 - Mid-Tex Gas Division Addition 080.66656 38000 7,857 080 190 - Mid-Tex Gas Division Addition 080.66666 37601 5,380,731 080 190 - Mid-Tex Gas Division Addition 080.66668 37602 21,371 080 190 - Mid-Tex Gas Division Addition 080.66668 38000 7,124 080 190 - Mid-Tex Gas Division Addition 080.66669 37602 26,685 080 190 - Mid-Tex Gas Division Addition 080.66669 38000 18,059 080 190 - Mid-Tex Gas Division Addition 080.66670 37602 70,449 080 190 - Mid-Tex Gas Division Addition 080.66670 38000 18,923 080 190 - Mid-Tex Gas Division Addition 080.66671 37800 463 080 190 - Mid-Tex Gas Division Addition 080.66672 37601 645 080 190 - Mid-Tex Gas Division Addition 080.66672 37602 5,160 080 190 - Mid-Tex Gas Division Addition 080.66672 37800 26,444 080 190 - Mid-Tex Gas Division Addition 080.66673 37601 761 080 190 - Mid-Tex Gas Division Addition 080.66673 37602 6,087 080 190 - Mid-Tex Gas Division Addition 080.66673 37800 25,490 080 190 - Mid-Tex Gas Division Addition 080.66675 37800 21 080 190 - Mid-Tex Gas Division Addition 080.66678 37602 10,391 080 190 - Mid-Tex Gas Division Addition 080.66686 37602 1,380 080 190 - Mid-Tex Gas Division Addition 080.66686 38000 67 080 190 - Mid-Tex Gas Division Addition 080.66692 37602 50,093 080 190 - Mid-Tex Gas Division Addition 080.66692 38000 12,523 080 190 - Mid-Tex Gas Division Addition 080.66696 37602 2,638 080 190 - Mid-Tex Gas Division Addition 080.66696 38000 293 MTX Additions by FERC Page 44 of 101 442 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.66701 37602 27,388 080 190 - Mid-Tex Gas Division Addition 080.66701 38000 702 080 190 - Mid-Tex Gas Division Addition 080.66704 37602 22,433 080 190 - Mid-Tex Gas Division Addition 080.66708 37602 670 080 190 - Mid-Tex Gas Division Addition 080.66708 38000 74 080 190 - Mid-Tex Gas Division Addition 080.66709 37602 5,716 080 190 - Mid-Tex Gas Division Addition 080.66709 37800 3,811 080 190 - Mid-Tex Gas Division Addition 080.66713 37602 8,507 080 190 - Mid-Tex Gas Division Addition 080.66713 38000 448 080 190 - Mid-Tex Gas Division Addition 080.66715 38000 162 080 190 - Mid-Tex Gas Division Addition 080.66717 37602 22,301 080 190 - Mid-Tex Gas Division Addition 080.66717 37800 27,257 080 190 - Mid-Tex Gas Division Addition 080.66718 37602 61,530 080 190 - Mid-Tex Gas Division Addition 080.66718 38000 28,955 080 190 - Mid-Tex Gas Division Addition 080.66726 37602 3,033 080 190 - Mid-Tex Gas Division Addition 080.66726 37800 4,550 080 190 - Mid-Tex Gas Division Addition 080.66728 37602 5,218 080 190 - Mid-Tex Gas Division Addition 080.66728 37800 8,637 080 190 - Mid-Tex Gas Division Addition 080.66728 38000 1,041 080 190 - Mid-Tex Gas Division Addition 080.66732 37602 4,792 080 190 - Mid-Tex Gas Division Addition 080.66732 37800 8,900 080 190 - Mid-Tex Gas Division Addition 080.66736 37602 3,693 080 190 - Mid-Tex Gas Division Addition 080.66736 38000 412 080 190 - Mid-Tex Gas Division Addition 080.66748 37602 4,015 080 190 - Mid-Tex Gas Division Addition 080.66748 38000 2,681 080 190 - Mid-Tex Gas Division Addition 080.66752 37602 36,915 080 190 - Mid-Tex Gas Division Addition 080.66752 38000 412 080 190 - Mid-Tex Gas Division Addition 080.66755 37602 22,818 080 190 - Mid-Tex Gas Division Addition 080.66755 38000 4,027 080 190 - Mid-Tex Gas Division Addition 080.66764 37601 18 080 190 - Mid-Tex Gas Division Addition 080.66769 37602 63,791 080 190 - Mid-Tex Gas Division Addition 080.66769 38000 3,357 080 190 - Mid-Tex Gas Division Addition 080.66771 37602 1,136 080 190 - Mid-Tex Gas Division Addition 080.66771 37800 4,544 080 190 - Mid-Tex Gas Division Addition 080.66775 37601 76,069 080 190 - Mid-Tex Gas Division Addition 080.66792 37602 5,750 080 190 - Mid-Tex Gas Division Addition 080.66793 37602 47,418 080 190 - Mid-Tex Gas Division Addition 080.66801 37602 13,590 080 190 - Mid-Tex Gas Division Addition 080.66801 38000 1,510 080 190 - Mid-Tex Gas Division Addition 080.66804 37602 15,370 080 190 - Mid-Tex Gas Division Addition 080.66804 38000 2,712 080 190 - Mid-Tex Gas Division Addition 080.66805 37602 5,804 080 190 - Mid-Tex Gas Division Addition 080.66805 38000 4,501 080 190 - Mid-Tex Gas Division Addition 080.66809 37601 1,093,642 080 190 - Mid-Tex Gas Division Addition 080.66810 37602 3,263 080 190 - Mid-Tex Gas Division Addition 080.66810 38000 67 080 190 - Mid-Tex Gas Division Addition 080.66815 37602 19,269 080 190 - Mid-Tex Gas Division Addition 080.66815 38000 2,141 080 190 - Mid-Tex Gas Division Addition 080.66817 37602 8,913 080 190 - Mid-Tex Gas Division Addition 080.66822 37602 24,297 080 190 - Mid-Tex Gas Division Addition 080.66822 38000 7,673 080 190 - Mid-Tex Gas Division Addition 080.66831 37602 15,237 080 190 - Mid-Tex Gas Division Addition 080.66841 37602 38,116 080 190 - Mid-Tex Gas Division Addition 080.66846 38000 1,032 080 190 - Mid-Tex Gas Division Addition 080.66850 37602 37,889 080 190 - Mid-Tex Gas Division Addition 080.66850 38000 16,260 080 190 - Mid-Tex Gas Division Addition 080.66859 37602 14,748 080 190 - Mid-Tex Gas Division Addition 080.66859 38000 1,640 080 190 - Mid-Tex Gas Division Addition 080.66862 37800 154 080 190 - Mid-Tex Gas Division Addition 080.66866 37602 17,637 080 190 - Mid-Tex Gas Division Addition 080.66866 38000 11,758 080 190 - Mid-Tex Gas Division Addition 080.66867 37800 322 080 190 - Mid-Tex Gas Division Addition 080.66869 38000 13,813 080 190 - Mid-Tex Gas Division Addition 080.66870 37602 70,881 080 190 - Mid-Tex Gas Division Addition 080.66870 38000 47,254 080 190 - Mid-Tex Gas Division Addition 080.66873 37602 4,494 080 190 - Mid-Tex Gas Division Addition 080.66878 37601 9,665 080 190 - Mid-Tex Gas Division Addition 080.66878 37800 15,464 080 190 - Mid-Tex Gas Division Addition 080.66878 38000 9,665 080 190 - Mid-Tex Gas Division Addition 080.66878 38100 9,665 080 190 - Mid-Tex Gas Division Addition 080.66887 37602 47 080 190 - Mid-Tex Gas Division Addition 080.66890 37602 1,320 080 190 - Mid-Tex Gas Division Addition 080.66890 38000 233 080 190 - Mid-Tex Gas Division Addition 080.66925 37602 15,833 080 190 - Mid-Tex Gas Division Addition 080.66925 38000 160 080 190 - Mid-Tex Gas Division Addition 080.66926 37602 300 080 190 - Mid-Tex Gas Division Addition 080.66927 37800 3,295 080 190 - Mid-Tex Gas Division Addition 080.66934 37800 452 080 190 - Mid-Tex Gas Division Addition 080.66956 38000 2,428 080 190 - Mid-Tex Gas Division Addition 080.66959 37602 16,077 080 190 - Mid-Tex Gas Division Addition 080.66959 38000 847 080 190 - Mid-Tex Gas Division Addition 080.66972 37900 660 080 190 - Mid-Tex Gas Division Addition 080.66976 37602 2,651 080 190 - Mid-Tex Gas Division Addition 080.66976 38000 470 080 190 - Mid-Tex Gas Division Addition 080.66980 37602 14,591 080 190 - Mid-Tex Gas Division Addition 080.66983 37602 8,286 080 190 - Mid-Tex Gas Division Addition 080.66983 38000 436 080 190 - Mid-Tex Gas Division Addition 080.66997 37602 25,453 080 190 - Mid-Tex Gas Division Addition 080.66997 38000 5,972 080 190 - Mid-Tex Gas Division Addition 080.67008 37602 7,732 080 190 - Mid-Tex Gas Division Addition 080.67008 38000 78 080 190 - Mid-Tex Gas Division Addition 080.67010 37602 23,286 080 190 - Mid-Tex Gas Division Addition 080.67010 38000 476 080 190 - Mid-Tex Gas Division Addition 080.67027 37602 39,961 080 190 - Mid-Tex Gas Division Addition 080.67027 38000 404 080 190 - Mid-Tex Gas Division Addition 080.67030 37602 13,955 080 190 - Mid-Tex Gas Division Addition 080.67033 37602 11,958 080 190 - Mid-Tex Gas Division Addition 080.67058 37800 308 080 190 - Mid-Tex Gas Division Addition 080.67060 37602 0 080 190 - Mid-Tex Gas Division Addition 080.67072 37602 7,766 080 190 - Mid-Tex Gas Division Addition 080.67072 38000 3,439 080 190 - Mid-Tex Gas Division Addition 080.67075 37602 385 080 190 - Mid-Tex Gas Division Addition 080.67077 37601 151,106 080 190 - Mid-Tex Gas Division Addition 080.67096 37602 5,122 080 190 - Mid-Tex Gas Division Addition 080.67096 38000 572 080 190 - Mid-Tex Gas Division Addition 080.67099 37602 24,599 080 190 - Mid-Tex Gas Division Addition 080.67099 38000 2,762 MTX Additions by FERC Page 45 of 101 443 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.67106 37602 - 080 190 - Mid-Tex Gas Division Addition 080.67113 37602 6,207 080 190 - Mid-Tex Gas Division Addition 080.67113 38000 2,069 080 190 - Mid-Tex Gas Division Addition 080.67115 37602 23,711 080 190 - Mid-Tex Gas Division Addition 080.67138 37601 19,989 080 190 - Mid-Tex Gas Division Addition 080.67139 37602 21,649 080 190 - Mid-Tex Gas Division Addition 080.67142 37602 13,777 080 190 - Mid-Tex Gas Division Addition 080.67142 38000 13,791 080 190 - Mid-Tex Gas Division Addition 080.67162 37602 42,615 080 190 - Mid-Tex Gas Division Addition 080.67166 37602 3,747 080 190 - Mid-Tex Gas Division Addition 080.67166 38000 661 080 190 - Mid-Tex Gas Division Addition 080.67167 37602 1,155 080 190 - Mid-Tex Gas Division Addition 080.67183 37602 7,496 080 190 - Mid-Tex Gas Division Addition 080.67210 37800 4,329 080 190 - Mid-Tex Gas Division Addition 080.67213 37602 17,118 080 190 - Mid-Tex Gas Division Addition 080.67213 38000 1,909 080 190 - Mid-Tex Gas Division Addition 080.67216 37602 13,342 080 190 - Mid-Tex Gas Division Addition 080.67219 37602 12,873 080 190 - Mid-Tex Gas Division Addition 080.67219 37800 2,411 080 190 - Mid-Tex Gas Division Addition 080.67219 38000 805 080 190 - Mid-Tex Gas Division Addition 080.67226 37602 266,066 080 190 - Mid-Tex Gas Division Addition 080.67226 38000 5,430 080 190 - Mid-Tex Gas Division Addition 080.67227 37602 62,795 080 190 - Mid-Tex Gas Division Addition 080.67228 37601 6,062 080 190 - Mid-Tex Gas Division Addition 080.67228 37602 297,046 080 190 - Mid-Tex Gas Division Addition 080.67229 37602 24,605 080 190 - Mid-Tex Gas Division Addition 080.67230 37602 107,367 080 190 - Mid-Tex Gas Division Addition 080.67231 37601 46,138 080 190 - Mid-Tex Gas Division Addition 080.67231 37602 30,758 080 190 - Mid-Tex Gas Division Addition 080.67232 37602 15,418 080 190 - Mid-Tex Gas Division Addition 080.67237 37602 11,134 080 190 - Mid-Tex Gas Division Addition 080.67241 37601 518 080 190 - Mid-Tex Gas Division Addition 080.67245 37602 16,036 080 190 - Mid-Tex Gas Division Addition 080.67245 38000 6,872 080 190 - Mid-Tex Gas Division Addition 080.67250 37602 37,802 080 190 - Mid-Tex Gas Division Addition 080.67250 38000 1,169 080 190 - Mid-Tex Gas Division Addition 080.67255 37602 2,759 080 190 - Mid-Tex Gas Division Addition 080.67255 38000 145 080 190 - Mid-Tex Gas Division Addition 080.67266 37602 11,971 080 190 - Mid-Tex Gas Division Addition 080.67266 37800 630 080 190 - Mid-Tex Gas Division Addition 080.67267 37602 8,754 080 190 - Mid-Tex Gas Division Addition 080.67270 37602 7,475 080 190 - Mid-Tex Gas Division Addition 080.67270 38000 1,869 080 190 - Mid-Tex Gas Division Addition 080.67272 37602 825 080 190 - Mid-Tex Gas Division Addition 080.67280 37602 13,703 080 190 - Mid-Tex Gas Division Addition 080.67280 38000 9,135 080 190 - Mid-Tex Gas Division Addition 080.67287 37602 13,805 080 190 - Mid-Tex Gas Division Addition 080.67287 38000 429 080 190 - Mid-Tex Gas Division Addition 080.67295 37602 1,655 080 190 - Mid-Tex Gas Division Addition 080.67296 37602 5,219 080 190 - Mid-Tex Gas Division Addition 080.67322 37602 16,242 080 190 - Mid-Tex Gas Division Addition 080.67322 38000 855 080 190 - Mid-Tex Gas Division Addition 080.67332 37602 11,831 080 190 - Mid-Tex Gas Division Addition 080.67332 38000 3,944 080 190 - Mid-Tex Gas Division Addition 080.67336 37602 34,210 080 190 - Mid-Tex Gas Division Addition 080.67336 38000 1,425 080 190 - Mid-Tex Gas Division Addition 080.67339 37602 (68) 080 190 - Mid-Tex Gas Division Addition 080.67343 37602 2,684 080 190 - Mid-Tex Gas Division Addition 080.67346 37602 5,662 080 190 - Mid-Tex Gas Division Addition 080.67346 38000 313 080 190 - Mid-Tex Gas Division Addition 080.67347 37602 18,914 080 190 - Mid-Tex Gas Division Addition 080.67347 38000 4,728 080 190 - Mid-Tex Gas Division Addition 080.67350 37800 3,895 080 190 - Mid-Tex Gas Division Addition 080.67352 37602 8,718 080 190 - Mid-Tex Gas Division Addition 080.67354 37602 23,063 080 190 - Mid-Tex Gas Division Addition 080.67354 38000 5,766 080 190 - Mid-Tex Gas Division Addition 080.67355 37602 11,251 080 190 - Mid-Tex Gas Division Addition 080.67355 38000 2,813 080 190 - Mid-Tex Gas Division Addition 080.67359 37602 19,561 080 190 - Mid-Tex Gas Division Addition 080.67359 38000 8,384 080 190 - Mid-Tex Gas Division Addition 080.67362 37602 27,908 080 190 - Mid-Tex Gas Division Addition 080.67362 38000 4,925 080 190 - Mid-Tex Gas Division Addition 080.67363 37602 6,069 080 190 - Mid-Tex Gas Division Addition 080.67363 38000 1,517 080 190 - Mid-Tex Gas Division Addition 080.67364 37602 18,284 080 190 - Mid-Tex Gas Division Addition 080.67364 38000 6,095 080 190 - Mid-Tex Gas Division Addition 080.67365 37602 9,750 080 190 - Mid-Tex Gas Division Addition 080.67365 38000 3,250 080 190 - Mid-Tex Gas Division Addition 080.67366 37602 26,173 080 190 - Mid-Tex Gas Division Addition 080.67366 38000 1,378 080 190 - Mid-Tex Gas Division Addition 080.67370 37602 78,038 080 190 - Mid-Tex Gas Division Addition 080.67370 38000 4,107 080 190 - Mid-Tex Gas Division Addition 080.67372 37602 5,919 080 190 - Mid-Tex Gas Division Addition 080.67378 37602 1,590 080 190 - Mid-Tex Gas Division Addition 080.67381 37602 506 080 190 - Mid-Tex Gas Division Addition 080.67381 38000 91 080 190 - Mid-Tex Gas Division Addition 080.67385 37602 - 080 190 - Mid-Tex Gas Division Addition 080.67388 37602 409 080 190 - Mid-Tex Gas Division Addition 080.67389 37602 14,390 080 190 - Mid-Tex Gas Division Addition 080.67390 37602 5,904 080 190 - Mid-Tex Gas Division Addition 080.67397 37602 32,583 080 190 - Mid-Tex Gas Division Addition 080.67397 38000 9,733 080 190 - Mid-Tex Gas Division Addition 080.67401 37602 15,238 080 190 - Mid-Tex Gas Division Addition 080.67401 38000 1,511 080 190 - Mid-Tex Gas Division Addition 080.67403 37602 1,966 080 190 - Mid-Tex Gas Division Addition 080.67409 37601 405 080 190 - Mid-Tex Gas Division Addition 080.67411 37602 - 080 190 - Mid-Tex Gas Division Addition 080.67422 37601 3,434 080 190 - Mid-Tex Gas Division Addition 080.67422 37602 24,059 080 190 - Mid-Tex Gas Division Addition 080.67422 38000 6,874 080 190 - Mid-Tex Gas Division Addition 080.67436 37602 34,695 080 190 - Mid-Tex Gas Division Addition 080.67436 38000 3,855 080 190 - Mid-Tex Gas Division Addition 080.67455 37602 104,187 080 190 - Mid-Tex Gas Division Addition 080.67455 38000 7,842 080 190 - Mid-Tex Gas Division Addition 080.67468 37601 317 080 190 - Mid-Tex Gas Division Addition 080.67469 37602 12,875 080 190 - Mid-Tex Gas Division Addition 080.67469 38000 6,933 MTX Additions by FERC Page 46 of 101 444 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.67478 37602 5,354 080 190 - Mid-Tex Gas Division Addition 080.67495 37800 609 080 190 - Mid-Tex Gas Division Addition 080.67497 37602 21,451 080 190 - Mid-Tex Gas Division Addition 080.67497 38000 2,384 080 190 - Mid-Tex Gas Division Addition 080.67498 37602 38,453 080 190 - Mid-Tex Gas Division Addition 080.67498 38000 6,786 080 190 - Mid-Tex Gas Division Addition 080.67544 37800 678 080 190 - Mid-Tex Gas Division Addition 080.67551 37602 8,820 080 190 - Mid-Tex Gas Division Addition 080.67551 38000 464 080 190 - Mid-Tex Gas Division Addition 080.67556 38000 21,721 080 190 - Mid-Tex Gas Division Addition 080.67560 37602 2,986 080 190 - Mid-Tex Gas Division Addition 080.67560 38000 158 080 190 - Mid-Tex Gas Division Addition 080.67562 37602 17,160 080 190 - Mid-Tex Gas Division Addition 080.67562 38000 2,121 080 190 - Mid-Tex Gas Division Addition 080.67566 37602 30,241 080 190 - Mid-Tex Gas Division Addition 080.67566 38000 30,242 080 190 - Mid-Tex Gas Division Addition 080.67573 37602 43,732 080 190 - Mid-Tex Gas Division Addition 080.67580 37602 10,774 080 190 - Mid-Tex Gas Division Addition 080.67583 37602 2,611 080 190 - Mid-Tex Gas Division Addition 080.67589 37800 1,180 080 190 - Mid-Tex Gas Division Addition 080.67590 37602 65,874 080 190 - Mid-Tex Gas Division Addition 080.67592 37602 5,258 080 190 - Mid-Tex Gas Division Addition 080.67597 37602 6,194 080 190 - Mid-Tex Gas Division Addition 080.67598 37800 42 080 190 - Mid-Tex Gas Division Addition 080.67604 37602 36,746 080 190 - Mid-Tex Gas Division Addition 080.67604 38000 2,346 080 190 - Mid-Tex Gas Division Addition 080.67610 37602 85,061 080 190 - Mid-Tex Gas Division Addition 080.67623 38000 2,203 080 190 - Mid-Tex Gas Division Addition 080.67626 37602 2,779 080 190 - Mid-Tex Gas Division Addition 080.67629 37800 1,024 080 190 - Mid-Tex Gas Division Addition 080.67631 37602 32,082 080 190 - Mid-Tex Gas Division Addition 080.67631 38000 655 080 190 - Mid-Tex Gas Division Addition 080.67644 37602 5,979 080 190 - Mid-Tex Gas Division Addition 080.67672 37800 9,658 080 190 - Mid-Tex Gas Division Addition 080.67682 37602 13,771 080 190 - Mid-Tex Gas Division Addition 080.67682 38000 3,652 080 190 - Mid-Tex Gas Division Addition 080.67683 37800 311 080 190 - Mid-Tex Gas Division Addition 080.67688 37602 5,387 080 190 - Mid-Tex Gas Division Addition 080.67688 38000 1,348 080 190 - Mid-Tex Gas Division Addition 080.67720 37602 40,465 080 190 - Mid-Tex Gas Division Addition 080.67720 38000 3,046 080 190 - Mid-Tex Gas Division Addition 080.67727 37602 7,544 080 190 - Mid-Tex Gas Division Addition 080.67731 37602 5,676 080 190 - Mid-Tex Gas Division Addition 080.67748 38000 11,935 080 190 - Mid-Tex Gas Division Addition 080.67753 37602 9,135 080 190 - Mid-Tex Gas Division Addition 080.67753 38000 1,015 080 190 - Mid-Tex Gas Division Addition 080.67754 37602 12,457 080 190 - Mid-Tex Gas Division Addition 080.67754 38000 656 080 190 - Mid-Tex Gas Division Addition 080.67757 37602 64 080 190 - Mid-Tex Gas Division Addition 080.67766 37602 2,983 080 190 - Mid-Tex Gas Division Addition 080.67772 37800 39 080 190 - Mid-Tex Gas Division Addition 080.67774 37800 597 080 190 - Mid-Tex Gas Division Addition 080.67782 37602 58,821 080 190 - Mid-Tex Gas Division Addition 080.67782 38000 19,263 080 190 - Mid-Tex Gas Division Addition 080.67783 37602 8,777 080 190 - Mid-Tex Gas Division Addition 080.67783 38000 2,194 080 190 - Mid-Tex Gas Division Addition 080.67791 37602 27,835 080 190 - Mid-Tex Gas Division Addition 080.67792 37602 191,962 080 190 - Mid-Tex Gas Division Addition 080.67792 38000 1,939 080 190 - Mid-Tex Gas Division Addition 080.67806 37602 7,868 080 190 - Mid-Tex Gas Division Addition 080.67824 37602 183 080 190 - Mid-Tex Gas Division Addition 080.67825 37602 62,348 080 190 - Mid-Tex Gas Division Addition 080.67826 37602 62,548 080 190 - Mid-Tex Gas Division Addition 080.67827 37602 125,929 080 190 - Mid-Tex Gas Division Addition 080.67827 38000 67,808 080 190 - Mid-Tex Gas Division Addition 080.67829 37602 2,496 080 190 - Mid-Tex Gas Division Addition 080.67829 37800 6,989 080 190 - Mid-Tex Gas Division Addition 080.67829 38000 499 080 190 - Mid-Tex Gas Division Addition 080.67833 37602 17,471 080 190 - Mid-Tex Gas Division Addition 080.67833 38000 4,367 080 190 - Mid-Tex Gas Division Addition 080.67843 37602 28,153 080 190 - Mid-Tex Gas Division Addition 080.67846 37601 374 080 190 - Mid-Tex Gas Division Addition 080.67854 37602 1,319 080 190 - Mid-Tex Gas Division Addition 080.67854 37800 2,273 080 190 - Mid-Tex Gas Division Addition 080.67854 38000 183 080 190 - Mid-Tex Gas Division Addition 080.67855 37602 18,445 080 190 - Mid-Tex Gas Division Addition 080.67860 37602 3,887 080 190 - Mid-Tex Gas Division Addition 080.67860 37800 2,851 080 190 - Mid-Tex Gas Division Addition 080.67873 37602 294 080 190 - Mid-Tex Gas Division Addition 080.67873 37800 2,647 080 190 - Mid-Tex Gas Division Addition 080.67887 37602 12,705 080 190 - Mid-Tex Gas Division Addition 080.67887 38000 3,188 080 190 - Mid-Tex Gas Division Addition 080.67888 37602 15,068 080 190 - Mid-Tex Gas Division Addition 080.67893 37602 30,131 080 190 - Mid-Tex Gas Division Addition 080.67895 37602 10,686 080 190 - Mid-Tex Gas Division Addition 080.67895 38000 1,897 080 190 - Mid-Tex Gas Division Addition 080.67908 37602 20,228 080 190 - Mid-Tex Gas Division Addition 080.67908 38000 1,065 080 190 - Mid-Tex Gas Division Addition 080.67909 37602 8,487 080 190 - Mid-Tex Gas Division Addition 080.67909 38000 174 080 190 - Mid-Tex Gas Division Addition 080.67911 37602 17,221 080 190 - Mid-Tex Gas Division Addition 080.67911 38000 1,914 080 190 - Mid-Tex Gas Division Addition 080.67912 37602 13,924 080 190 - Mid-Tex Gas Division Addition 080.67912 37800 6,962 080 190 - Mid-Tex Gas Division Addition 080.67912 38000 2,321 080 190 - Mid-Tex Gas Division Addition 080.67913 37602 1,545 080 190 - Mid-Tex Gas Division Addition 080.67913 37800 4,010 080 190 - Mid-Tex Gas Division Addition 080.67913 38000 772 080 190 - Mid-Tex Gas Division Addition 080.67920 37602 3,040 080 190 - Mid-Tex Gas Division Addition 080.67930 37602 61,247 080 190 - Mid-Tex Gas Division Addition 080.67930 38000 3,225 080 190 - Mid-Tex Gas Division Addition 080.67933 38000 35,416 080 190 - Mid-Tex Gas Division Addition 080.67934 37602 6,879 080 190 - Mid-Tex Gas Division Addition 080.67934 38000 764 080 190 - Mid-Tex Gas Division Addition 080.67939 37800 156 080 190 - Mid-Tex Gas Division Addition 080.67946 37800 551 080 190 - Mid-Tex Gas Division Addition 080.67952 37602 611 MTX Additions by FERC Page 47 of 101 445 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.67952 37800 4,278 080 190 - Mid-Tex Gas Division Addition 080.67953 37602 8,191 080 190 - Mid-Tex Gas Division Addition 080.67953 37800 983 080 190 - Mid-Tex Gas Division Addition 080.67955 37602 7,359 080 190 - Mid-Tex Gas Division Addition 080.67955 37800 4,906 080 190 - Mid-Tex Gas Division Addition 080.67956 37602 3,966 080 190 - Mid-Tex Gas Division Addition 080.67956 37800 6,795 080 190 - Mid-Tex Gas Division Addition 080.67956 38000 566 080 190 - Mid-Tex Gas Division Addition 080.67957 37602 6,862 080 190 - Mid-Tex Gas Division Addition 080.67957 37800 3,920 080 190 - Mid-Tex Gas Division Addition 080.67957 38000 244 080 190 - Mid-Tex Gas Division Addition 080.67959 37602 3,119 080 190 - Mid-Tex Gas Division Addition 080.67959 37800 4,678 080 190 - Mid-Tex Gas Division Addition 080.67961 37602 7,760 080 190 - Mid-Tex Gas Division Addition 080.67961 37800 1,370 080 190 - Mid-Tex Gas Division Addition 080.67962 37602 6,306 080 190 - Mid-Tex Gas Division Addition 080.67962 37800 1,112 080 190 - Mid-Tex Gas Division Addition 080.67964 37601 4,499 080 190 - Mid-Tex Gas Division Addition 080.67966 37602 8,842 080 190 - Mid-Tex Gas Division Addition 080.67966 37800 5,895 080 190 - Mid-Tex Gas Division Addition 080.67967 37602 3,982 080 190 - Mid-Tex Gas Division Addition 080.67967 37800 2,658 080 190 - Mid-Tex Gas Division Addition 080.67968 37602 3,491 080 190 - Mid-Tex Gas Division Addition 080.67968 37800 5,237 080 190 - Mid-Tex Gas Division Addition 080.67969 37602 4,894 080 190 - Mid-Tex Gas Division Addition 080.67969 37800 1,632 080 190 - Mid-Tex Gas Division Addition 080.67970 37602 4,146 080 190 - Mid-Tex Gas Division Addition 080.67970 37800 4,620 080 190 - Mid-Tex Gas Division Addition 080.67971 37602 19,708 080 190 - Mid-Tex Gas Division Addition 080.67971 38000 3,478 080 190 - Mid-Tex Gas Division Addition 080.67972 37602 14,460 080 190 - Mid-Tex Gas Division Addition 080.67972 38000 2,552 080 190 - Mid-Tex Gas Division Addition 080.67973 37602 22,007 080 190 - Mid-Tex Gas Division Addition 080.67973 38000 2,445 080 190 - Mid-Tex Gas Division Addition 080.67974 37602 11,179 080 190 - Mid-Tex Gas Division Addition 080.67974 38000 4,791 080 190 - Mid-Tex Gas Division Addition 080.67988 37602 1,429 080 190 - Mid-Tex Gas Division Addition 080.67988 38000 98 080 190 - Mid-Tex Gas Division Addition 080.68023 37602 7,656 080 190 - Mid-Tex Gas Division Addition 080.68023 38000 1,144 080 190 - Mid-Tex Gas Division Addition 080.68029 37601 27,477 080 190 - Mid-Tex Gas Division Addition 080.68047 37602 9,017 080 190 - Mid-Tex Gas Division Addition 080.68047 38000 3,507 080 190 - Mid-Tex Gas Division Addition 080.68063 37602 7,552 080 190 - Mid-Tex Gas Division Addition 080.68078 37602 17,356 080 190 - Mid-Tex Gas Division Addition 080.68078 38000 354 080 190 - Mid-Tex Gas Division Addition 080.68081 37602 32,859 080 190 - Mid-Tex Gas Division Addition 080.68081 38000 2,097 080 190 - Mid-Tex Gas Division Addition 080.68093 37602 1,980 080 190 - Mid-Tex Gas Division Addition 080.68108 37602 9,064 080 190 - Mid-Tex Gas Division Addition 080.68108 38000 2,266 080 190 - Mid-Tex Gas Division Addition 080.68110 37602 12,919 080 190 - Mid-Tex Gas Division Addition 080.68118 37601 322 080 190 - Mid-Tex Gas Division Addition 080.68124 37602 4,627 080 190 - Mid-Tex Gas Division Addition 080.68128 37602 52,102 080 190 - Mid-Tex Gas Division Addition 080.68157 37602 37,226 080 190 - Mid-Tex Gas Division Addition 080.68157 38000 4,136 080 190 - Mid-Tex Gas Division Addition 080.68162 37602 30 080 190 - Mid-Tex Gas Division Addition 080.68185 37602 801 080 190 - Mid-Tex Gas Division Addition 080.68209 37602 38,877 080 190 - Mid-Tex Gas Division Addition 080.68209 38000 3,380 080 190 - Mid-Tex Gas Division Addition 080.68212 38000 46,104 080 190 - Mid-Tex Gas Division Addition 080.68225 37600 6,277 080 190 - Mid-Tex Gas Division Addition 080.68240 37602 92,652 080 190 - Mid-Tex Gas Division Addition 080.68245 37602 26,331 080 190 - Mid-Tex Gas Division Addition 080.68245 38000 159 080 190 - Mid-Tex Gas Division Addition 080.68248 37602 59,319 080 190 - Mid-Tex Gas Division Addition 080.68248 38000 20,842 080 190 - Mid-Tex Gas Division Addition 080.68252 37602 42,762 080 190 - Mid-Tex Gas Division Addition 080.68252 38000 432 080 190 - Mid-Tex Gas Division Addition 080.68253 37602 22,538 080 190 - Mid-Tex Gas Division Addition 080.68253 38000 22,313 080 190 - Mid-Tex Gas Division Addition 080.68255 37602 19,701 080 190 - Mid-Tex Gas Division Addition 080.68255 38000 18,186 080 190 - Mid-Tex Gas Division Addition 080.68256 37602 63,211 080 190 - Mid-Tex Gas Division Addition 080.68258 37600 6,977 080 190 - Mid-Tex Gas Division Addition 080.68259 37602 33,172 080 190 - Mid-Tex Gas Division Addition 080.68259 38000 802 080 190 - Mid-Tex Gas Division Addition 080.68261 37602 38,595 080 190 - Mid-Tex Gas Division Addition 080.68261 38000 990 080 190 - Mid-Tex Gas Division Addition 080.68262 37602 20,138 080 190 - Mid-Tex Gas Division Addition 080.68262 38000 20,138 080 190 - Mid-Tex Gas Division Addition 080.68264 37602 69,695 080 190 - Mid-Tex Gas Division Addition 080.68264 38000 12,299 080 190 - Mid-Tex Gas Division Addition 080.68266 37602 2,792 080 190 - Mid-Tex Gas Division Addition 080.68266 38000 310 080 190 - Mid-Tex Gas Division Addition 080.68269 37602 17,208 080 190 - Mid-Tex Gas Division Addition 080.68269 38000 5,736 080 190 - Mid-Tex Gas Division Addition 080.68271 37602 58,475 080 190 - Mid-Tex Gas Division Addition 080.68271 38000 1,193 080 190 - Mid-Tex Gas Division Addition 080.68272 37602 4,356 080 190 - Mid-Tex Gas Division Addition 080.68272 37800 2,906 080 190 - Mid-Tex Gas Division Addition 080.68273 37602 3,873 080 190 - Mid-Tex Gas Division Addition 080.68273 37800 3,873 080 190 - Mid-Tex Gas Division Addition 080.68278 37602 14,110 080 190 - Mid-Tex Gas Division Addition 080.68279 37602 4,343 080 190 - Mid-Tex Gas Division Addition 080.68279 37800 5,429 080 190 - Mid-Tex Gas Division Addition 080.68279 38000 1,086 080 190 - Mid-Tex Gas Division Addition 080.68287 37602 9,789 080 190 - Mid-Tex Gas Division Addition 080.68287 38000 344 080 190 - Mid-Tex Gas Division Addition 080.68290 37602 - 080 190 - Mid-Tex Gas Division Addition 080.68294 37602 4,063 080 190 - Mid-Tex Gas Division Addition 080.68294 37800 3,252 080 190 - Mid-Tex Gas Division Addition 080.68294 38000 813 080 190 - Mid-Tex Gas Division Addition 080.68308 37602 - 080 190 - Mid-Tex Gas Division Addition 080.68309 37602 15,569 080 190 - Mid-Tex Gas Division Addition 080.68309 38000 5,190 MTX Additions by FERC Page 48 of 101 446 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.68310 37602 66,416 080 190 - Mid-Tex Gas Division Addition 080.68310 38000 66,416 080 190 - Mid-Tex Gas Division Addition 080.68312 37602 43,503 080 190 - Mid-Tex Gas Division Addition 080.68312 38000 14,501 080 190 - Mid-Tex Gas Division Addition 080.68313 37602 27,789 080 190 - Mid-Tex Gas Division Addition 080.68314 37602 49,806 080 190 - Mid-Tex Gas Division Addition 080.68314 38000 1,131 080 190 - Mid-Tex Gas Division Addition 080.68315 37602 32,193 080 190 - Mid-Tex Gas Division Addition 080.68315 38000 996 080 190 - Mid-Tex Gas Division Addition 080.68316 37602 32,434 080 190 - Mid-Tex Gas Division Addition 080.68316 38000 845 080 190 - Mid-Tex Gas Division Addition 080.68318 37602 41,846 080 190 - Mid-Tex Gas Division Addition 080.68318 38000 1,241 080 190 - Mid-Tex Gas Division Addition 080.68335 37800 3,558 080 190 - Mid-Tex Gas Division Addition 080.68337 37602 576 080 190 - Mid-Tex Gas Division Addition 080.68337 37800 576 080 190 - Mid-Tex Gas Division Addition 080.68344 37601 62,385 080 190 - Mid-Tex Gas Division Addition 080.68346 37602 2,754 080 190 - Mid-Tex Gas Division Addition 080.68346 37800 2,754 080 190 - Mid-Tex Gas Division Addition 080.68349 37602 3,058 080 190 - Mid-Tex Gas Division Addition 080.68353 37602 28 080 190 - Mid-Tex Gas Division Addition 080.68360 37602 23,866 080 190 - Mid-Tex Gas Division Addition 080.68361 37602 32,388 080 190 - Mid-Tex Gas Division Addition 080.68361 38000 3,599 080 190 - Mid-Tex Gas Division Addition 080.68365 37602 9,706 080 190 - Mid-Tex Gas Division Addition 080.68365 38000 844 080 190 - Mid-Tex Gas Division Addition 080.68373 37602 (12,698) 080 190 - Mid-Tex Gas Division Addition 080.68374 37602 48,176 080 190 - Mid-Tex Gas Division Addition 080.68374 38000 1,225 080 190 - Mid-Tex Gas Division Addition 080.68375 37602 18,436 080 190 - Mid-Tex Gas Division Addition 080.68375 38000 667 080 190 - Mid-Tex Gas Division Addition 080.68385 37602 42,014 080 190 - Mid-Tex Gas Division Addition 080.68385 38000 18,006 080 190 - Mid-Tex Gas Division Addition 080.68386 37602 23,826 080 190 - Mid-Tex Gas Division Addition 080.68386 38000 10,211 080 190 - Mid-Tex Gas Division Addition 080.68393 37602 78,969 080 190 - Mid-Tex Gas Division Addition 080.68393 37800 105 080 190 - Mid-Tex Gas Division Addition 080.68393 38000 1,392 080 190 - Mid-Tex Gas Division Addition 080.68395 37602 53,279 080 190 - Mid-Tex Gas Division Addition 080.68395 37800 81 080 190 - Mid-Tex Gas Division Addition 080.68395 38000 912 080 190 - Mid-Tex Gas Division Addition 080.68396 37602 64,890 080 190 - Mid-Tex Gas Division Addition 080.68396 38000 861 080 190 - Mid-Tex Gas Division Addition 080.68398 37602 60,247 080 190 - Mid-Tex Gas Division Addition 080.68399 37602 30,752 080 190 - Mid-Tex Gas Division Addition 080.68399 38000 4,430 080 190 - Mid-Tex Gas Division Addition 080.68400 37602 30,803 080 190 - Mid-Tex Gas Division Addition 080.68400 38000 1,621 080 190 - Mid-Tex Gas Division Addition 080.68403 37602 27,414 080 190 - Mid-Tex Gas Division Addition 080.68403 38000 6,853 080 190 - Mid-Tex Gas Division Addition 080.68404 37602 37,397 080 190 - Mid-Tex Gas Division Addition 080.68404 38000 9,349 080 190 - Mid-Tex Gas Division Addition 080.68407 37602 19,531 080 190 - Mid-Tex Gas Division Addition 080.68407 38000 814 080 190 - Mid-Tex Gas Division Addition 080.68408 37601 1,696 080 190 - Mid-Tex Gas Division Addition 080.68411 37602 48,230 080 190 - Mid-Tex Gas Division Addition 080.68411 38000 25,970 080 190 - Mid-Tex Gas Division Addition 080.68416 37602 70,006 080 190 - Mid-Tex Gas Division Addition 080.68416 38000 7,778 080 190 - Mid-Tex Gas Division Addition 080.68418 37800 1,901 080 190 - Mid-Tex Gas Division Addition 080.68421 37602 37,547 080 190 - Mid-Tex Gas Division Addition 080.68421 38000 16,091 080 190 - Mid-Tex Gas Division Addition 080.68422 37602 138,113 080 190 - Mid-Tex Gas Division Addition 080.68422 38000 34,528 080 190 - Mid-Tex Gas Division Addition 080.68423 37602 11,819 080 190 - Mid-Tex Gas Division Addition 080.68423 38000 7 080 190 - Mid-Tex Gas Division Addition 080.68427 37602 3,204 080 190 - Mid-Tex Gas Division Addition 080.68429 37601 58 080 190 - Mid-Tex Gas Division Addition 080.68429 37602 197,522 080 190 - Mid-Tex Gas Division Addition 080.68435 37602 2,173 080 190 - Mid-Tex Gas Division Addition 080.68435 37800 7,706 080 190 - Mid-Tex Gas Division Addition 080.68438 37602 7,595 080 190 - Mid-Tex Gas Division Addition 080.68438 38000 1,135 080 190 - Mid-Tex Gas Division Addition 080.68439 37602 2,274 080 190 - Mid-Tex Gas Division Addition 080.68439 37800 9,098 080 190 - Mid-Tex Gas Division Addition 080.68447 37602 18,376 080 190 - Mid-Tex Gas Division Addition 080.68447 38000 2,746 080 190 - Mid-Tex Gas Division Addition 080.68448 37602 21,319 080 190 - Mid-Tex Gas Division Addition 080.68453 37601 23 080 190 - Mid-Tex Gas Division Addition 080.68454 37602 6,113 080 190 - Mid-Tex Gas Division Addition 080.68455 37602 - 080 190 - Mid-Tex Gas Division Addition 080.68465 37602 14,635 080 190 - Mid-Tex Gas Division Addition 080.68468 37602 10,711 080 190 - Mid-Tex Gas Division Addition 080.68474 37602 34,594 080 190 - Mid-Tex Gas Division Addition 080.68474 38000 8,649 080 190 - Mid-Tex Gas Division Addition 080.68477 37602 18,227 080 190 - Mid-Tex Gas Division Addition 080.68477 38000 2,025 080 190 - Mid-Tex Gas Division Addition 080.68482 37602 3,729 080 190 - Mid-Tex Gas Division Addition 080.68482 38000 196 080 190 - Mid-Tex Gas Division Addition 080.68485 37602 26,052 080 190 - Mid-Tex Gas Division Addition 080.68486 37602 1,790 080 190 - Mid-Tex Gas Division Addition 080.68487 37602 48,322 080 190 - Mid-Tex Gas Division Addition 080.68487 38000 12,081 080 190 - Mid-Tex Gas Division Addition 080.68499 37602 18,806 080 190 - Mid-Tex Gas Division Addition 080.68499 38000 18,806 080 190 - Mid-Tex Gas Division Addition 080.68501 37602 31,489 080 190 - Mid-Tex Gas Division Addition 080.68501 38000 1,657 080 190 - Mid-Tex Gas Division Addition 080.68503 37602 1,912 080 190 - Mid-Tex Gas Division Addition 080.68503 38000 7,648 080 190 - Mid-Tex Gas Division Addition 080.68510 37602 51,985 080 190 - Mid-Tex Gas Division Addition 080.68513 37601 95 080 190 - Mid-Tex Gas Division Addition 080.68514 37602 34,564 080 190 - Mid-Tex Gas Division Addition 080.68514 38000 706 080 190 - Mid-Tex Gas Division Addition 080.68515 37602 37,907 080 190 - Mid-Tex Gas Division Addition 080.68515 38000 964 080 190 - Mid-Tex Gas Division Addition 080.68516 37602 30,589 080 190 - Mid-Tex Gas Division Addition 080.68516 38000 409 MTX Additions by FERC Page 49 of 101 447 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.68517 37602 55,675 080 190 - Mid-Tex Gas Division Addition 080.68517 38000 619 080 190 - Mid-Tex Gas Division Addition 080.68518 37602 24,658 080 190 - Mid-Tex Gas Division Addition 080.68518 38000 1,574 080 190 - Mid-Tex Gas Division Addition 080.68519 37602 68,920 080 190 - Mid-Tex Gas Division Addition 080.68519 38000 465 080 190 - Mid-Tex Gas Division Addition 080.68520 37602 4,860 080 190 - Mid-Tex Gas Division Addition 080.68520 38000 647 080 190 - Mid-Tex Gas Division Addition 080.68521 37602 38,059 080 190 - Mid-Tex Gas Division Addition 080.68521 38000 1,177 080 190 - Mid-Tex Gas Division Addition 080.68522 37602 27,281 080 190 - Mid-Tex Gas Division Addition 080.68522 38000 85 080 190 - Mid-Tex Gas Division Addition 080.68523 37602 30,865 080 190 - Mid-Tex Gas Division Addition 080.68523 38000 879 080 190 - Mid-Tex Gas Division Addition 080.68524 37602 24,663 080 190 - Mid-Tex Gas Division Addition 080.68524 38000 771 080 190 - Mid-Tex Gas Division Addition 080.68529 37602 24,252 080 190 - Mid-Tex Gas Division Addition 080.68534 37602 52,981 080 190 - Mid-Tex Gas Division Addition 080.68534 38000 5,887 080 190 - Mid-Tex Gas Division Addition 080.68536 37602 68,956 080 190 - Mid-Tex Gas Division Addition 080.68536 38000 12,169 080 190 - Mid-Tex Gas Division Addition 080.68541 37602 50,693 080 190 - Mid-Tex Gas Division Addition 080.68546 37600 6,635 080 190 - Mid-Tex Gas Division Addition 080.68561 37602 566 080 190 - Mid-Tex Gas Division Addition 080.68562 37600 167 080 190 - Mid-Tex Gas Division Addition 080.68562 37602 3,171 080 190 - Mid-Tex Gas Division Addition 080.68564 37602 39,690 080 190 - Mid-Tex Gas Division Addition 080.68566 37602 14,986 080 190 - Mid-Tex Gas Division Addition 080.68571 37800 1,845 080 190 - Mid-Tex Gas Division Addition 080.68574 37601 2,082,116 080 190 - Mid-Tex Gas Division Addition 080.68576 37600 114,478 080 190 - Mid-Tex Gas Division Addition 080.68576 37601 2,747,480 080 190 - Mid-Tex Gas Division Addition 080.68582 37602 40,318 080 190 - Mid-Tex Gas Division Addition 080.68582 38000 13,440 080 190 - Mid-Tex Gas Division Addition 080.68583 37602 18,999 080 190 - Mid-Tex Gas Division Addition 080.68583 38000 18,999 080 190 - Mid-Tex Gas Division Addition 080.68586 37602 21,461 080 190 - Mid-Tex Gas Division Addition 080.68586 38000 21,461 080 190 - Mid-Tex Gas Division Addition 080.68594 37602 - 080 190 - Mid-Tex Gas Division Addition 080.68597 37602 828 080 190 - Mid-Tex Gas Division Addition 080.68609 37601 711 080 190 - Mid-Tex Gas Division Addition 080.68619 37602 35,242 080 190 - Mid-Tex Gas Division Addition 080.68619 38000 6,219 080 190 - Mid-Tex Gas Division Addition 080.68622 37602 38,499 080 190 - Mid-Tex Gas Division Addition 080.68622 38000 25,666 080 190 - Mid-Tex Gas Division Addition 080.68623 37602 39,492 080 190 - Mid-Tex Gas Division Addition 080.68623 38000 371 080 190 - Mid-Tex Gas Division Addition 080.68628 37601 80,193 080 190 - Mid-Tex Gas Division Addition 080.68635 37800 27,797 080 190 - Mid-Tex Gas Division Addition 080.68646 37602 18,222 080 190 - Mid-Tex Gas Division Addition 080.68646 38000 18,222 080 190 - Mid-Tex Gas Division Addition 080.68650 37602 53,490 080 190 - Mid-Tex Gas Division Addition 080.68650 38000 53,490 080 190 - Mid-Tex Gas Division Addition 080.68652 37602 17,465 080 190 - Mid-Tex Gas Division Addition 080.68655 37602 16,810 080 190 - Mid-Tex Gas Division Addition 080.68655 38000 16,809 080 190 - Mid-Tex Gas Division Addition 080.68656 37602 38,225 080 190 - Mid-Tex Gas Division Addition 080.68656 38000 25,483 080 190 - Mid-Tex Gas Division Addition 080.68657 37602 48,942 080 190 - Mid-Tex Gas Division Addition 080.68657 38000 32,628 080 190 - Mid-Tex Gas Division Addition 080.68659 37602 27,179 080 190 - Mid-Tex Gas Division Addition 080.68659 38000 6,795 080 190 - Mid-Tex Gas Division Addition 080.68682 37602 43,360 080 190 - Mid-Tex Gas Division Addition 080.68682 38000 4,819 080 190 - Mid-Tex Gas Division Addition 080.68694 37602 34,559 080 190 - Mid-Tex Gas Division Addition 080.68694 38000 8,640 080 190 - Mid-Tex Gas Division Addition 080.68696 37602 12,529 080 190 - Mid-Tex Gas Division Addition 080.68696 38000 127 080 190 - Mid-Tex Gas Division Addition 080.68698 37602 17,713 080 190 - Mid-Tex Gas Division Addition 080.68698 38000 7,008 080 190 - Mid-Tex Gas Division Addition 080.68704 37602 33,511 080 190 - Mid-Tex Gas Division Addition 080.68704 38000 3,723 080 190 - Mid-Tex Gas Division Addition 080.68705 37602 79,644 080 190 - Mid-Tex Gas Division Addition 080.68705 38000 4,192 080 190 - Mid-Tex Gas Division Addition 080.68709 37602 9,101 080 190 - Mid-Tex Gas Division Addition 080.68711 37602 18,715 080 190 - Mid-Tex Gas Division Addition 080.68711 38000 18,715 080 190 - Mid-Tex Gas Division Addition 080.68712 37602 3,697 080 190 - Mid-Tex Gas Division Addition 080.68713 37602 48,822 080 190 - Mid-Tex Gas Division Addition 080.68713 38000 20,924 080 190 - Mid-Tex Gas Division Addition 080.68714 37602 32,750 080 190 - Mid-Tex Gas Division Addition 080.68714 38000 331 080 190 - Mid-Tex Gas Division Addition 080.68717 37602 12,463 080 190 - Mid-Tex Gas Division Addition 080.68718 37602 - 080 190 - Mid-Tex Gas Division Addition 080.68724 37602 3,866 080 190 - Mid-Tex Gas Division Addition 080.68727 37602 (133,854) 080 190 - Mid-Tex Gas Division Addition 080.68732 37602 15,055 080 190 - Mid-Tex Gas Division Addition 080.68732 38000 792 080 190 - Mid-Tex Gas Division Addition 080.68733 37602 6,742 080 190 - Mid-Tex Gas Division Addition 080.68733 38000 355 080 190 - Mid-Tex Gas Division Addition 080.68746 37602 1,762 080 190 - Mid-Tex Gas Division Addition 080.68747 37602 16,559 080 190 - Mid-Tex Gas Division Addition 080.68747 38000 4,140 080 190 - Mid-Tex Gas Division Addition 080.68748 38000 1,716 080 190 - Mid-Tex Gas Division Addition 080.68749 37602 44,876 080 190 - Mid-Tex Gas Division Addition 080.68749 38000 7,919 080 190 - Mid-Tex Gas Division Addition 080.68750 37602 8,329 080 190 - Mid-Tex Gas Division Addition 080.68750 38000 2,082 080 190 - Mid-Tex Gas Division Addition 080.68751 37602 28,622 080 190 - Mid-Tex Gas Division Addition 080.68751 38000 28,621 080 190 - Mid-Tex Gas Division Addition 080.68759 37602 23,761 080 190 - Mid-Tex Gas Division Addition 080.68759 38000 1,251 080 190 - Mid-Tex Gas Division Addition 080.68764 37602 27,548 080 190 - Mid-Tex Gas Division Addition 080.68766 37602 34,790 080 190 - Mid-Tex Gas Division Addition 080.68766 38000 710 080 190 - Mid-Tex Gas Division Addition 080.68792 37602 23,345 080 190 - Mid-Tex Gas Division Addition 080.68792 38000 23,344 MTX Additions by FERC Page 50 of 101 448 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.68793 37602 27,025 080 190 - Mid-Tex Gas Division Addition 080.68793 38000 24,946 080 190 - Mid-Tex Gas Division Addition 080.68794 37602 52,909 080 190 - Mid-Tex Gas Division Addition 080.68794 38000 35,273 080 190 - Mid-Tex Gas Division Addition 080.68798 37602 21,036 080 190 - Mid-Tex Gas Division Addition 080.68799 37602 30,205 080 190 - Mid-Tex Gas Division Addition 080.68799 38000 934 080 190 - Mid-Tex Gas Division Addition 080.68800 37602 25,204 080 190 - Mid-Tex Gas Division Addition 080.68800 38000 418 080 190 - Mid-Tex Gas Division Addition 080.68803 37602 31,322 080 190 - Mid-Tex Gas Division Addition 080.68803 38000 422 080 190 - Mid-Tex Gas Division Addition 080.68804 37602 54,075 080 190 - Mid-Tex Gas Division Addition 080.68807 37602 8,899 080 190 - Mid-Tex Gas Division Addition 080.68809 37602 9,249 080 190 - Mid-Tex Gas Division Addition 080.68810 37602 23,405 080 190 - Mid-Tex Gas Division Addition 080.68810 38000 1,232 080 190 - Mid-Tex Gas Division Addition 080.68812 37602 24,571 080 190 - Mid-Tex Gas Division Addition 080.68812 38000 248 080 190 - Mid-Tex Gas Division Addition 080.68813 37602 39,182 080 190 - Mid-Tex Gas Division Addition 080.68813 38000 2,062 080 190 - Mid-Tex Gas Division Addition 080.68814 37602 8,781 080 190 - Mid-Tex Gas Division Addition 080.68814 38000 2,195 080 190 - Mid-Tex Gas Division Addition 080.68816 37602 4,878 080 190 - Mid-Tex Gas Division Addition 080.68821 37601 41,166 080 190 - Mid-Tex Gas Division Addition 080.68823 37602 65,073 080 190 - Mid-Tex Gas Division Addition 080.68823 38000 1,477 080 190 - Mid-Tex Gas Division Addition 080.68828 37602 32,522 080 190 - Mid-Tex Gas Division Addition 080.68828 38000 292 080 190 - Mid-Tex Gas Division Addition 080.68830 37602 24,763 080 190 - Mid-Tex Gas Division Addition 080.68830 38000 557 080 190 - Mid-Tex Gas Division Addition 080.68831 37602 45,610 080 190 - Mid-Tex Gas Division Addition 080.68831 38000 493 080 190 - Mid-Tex Gas Division Addition 080.68833 37602 31,230 080 190 - Mid-Tex Gas Division Addition 080.68848 37602 2,197 080 190 - Mid-Tex Gas Division Addition 080.68848 38000 549 080 190 - Mid-Tex Gas Division Addition 080.68863 37602 8,572 080 190 - Mid-Tex Gas Division Addition 080.68863 38000 175 080 190 - Mid-Tex Gas Division Addition 080.68868 37602 34,535 080 190 - Mid-Tex Gas Division Addition 080.68868 38000 3,837 080 190 - Mid-Tex Gas Division Addition 080.68869 37602 9,750 080 190 - Mid-Tex Gas Division Addition 080.68869 38000 2,437 080 190 - Mid-Tex Gas Division Addition 080.68871 37602 8,537 080 190 - Mid-Tex Gas Division Addition 080.68871 38000 264 080 190 - Mid-Tex Gas Division Addition 080.68873 37602 40,830 080 190 - Mid-Tex Gas Division Addition 080.68873 38000 4,537 080 190 - Mid-Tex Gas Division Addition 080.68874 37602 1,977 080 190 - Mid-Tex Gas Division Addition 080.68877 37602 5,169 080 190 - Mid-Tex Gas Division Addition 080.68877 38000 5,169 080 190 - Mid-Tex Gas Division Addition 080.68890 37602 20,967 080 190 - Mid-Tex Gas Division Addition 080.68891 37602 643 080 190 - Mid-Tex Gas Division Addition 080.68918 37602 33,992 080 190 - Mid-Tex Gas Division Addition 080.68919 37602 12,431 080 190 - Mid-Tex Gas Division Addition 080.68919 38000 654 080 190 - Mid-Tex Gas Division Addition 080.68923 37602 11,811 080 190 - Mid-Tex Gas Division Addition 080.68923 38000 365 080 190 - Mid-Tex Gas Division Addition 080.68924 37602 41,552 080 190 - Mid-Tex Gas Division Addition 080.68924 38000 2,187 080 190 - Mid-Tex Gas Division Addition 080.68927 37602 102,304 080 190 - Mid-Tex Gas Division Addition 080.68927 38000 18,054 080 190 - Mid-Tex Gas Division Addition 080.68931 37602 6,650 080 190 - Mid-Tex Gas Division Addition 080.68931 38000 350 080 190 - Mid-Tex Gas Division Addition 080.68954 37601 25,261 080 190 - Mid-Tex Gas Division Addition 080.68956 37602 44,761 080 190 - Mid-Tex Gas Division Addition 080.68956 38000 2,356 080 190 - Mid-Tex Gas Division Addition 080.68957 37602 6,859 080 190 - Mid-Tex Gas Division Addition 080.68957 38000 1,715 080 190 - Mid-Tex Gas Division Addition 080.68958 37602 14,374 080 190 - Mid-Tex Gas Division Addition 080.68958 38000 1,597 080 190 - Mid-Tex Gas Division Addition 080.68960 37602 17,949 080 190 - Mid-Tex Gas Division Addition 080.68960 38000 1,994 080 190 - Mid-Tex Gas Division Addition 080.68990 37602 16,100 080 190 - Mid-Tex Gas Division Addition 080.68991 37602 10,155 080 190 - Mid-Tex Gas Division Addition 080.68991 38000 3,385 080 190 - Mid-Tex Gas Division Addition 080.68996 37602 65,207 080 190 - Mid-Tex Gas Division Addition 080.68996 38000 1,816 080 190 - Mid-Tex Gas Division Addition 080.69000 37602 50,184 080 190 - Mid-Tex Gas Division Addition 080.69000 38000 1,494 080 190 - Mid-Tex Gas Division Addition 080.69006 37602 25,486 080 190 - Mid-Tex Gas Division Addition 080.69008 37602 33,563 080 190 - Mid-Tex Gas Division Addition 080.69008 38000 709 080 190 - Mid-Tex Gas Division Addition 080.69010 38000 3,638 080 190 - Mid-Tex Gas Division Addition 080.69011 37602 35,667 080 190 - Mid-Tex Gas Division Addition 080.69011 38000 288 080 190 - Mid-Tex Gas Division Addition 080.69012 37602 26,453 080 190 - Mid-Tex Gas Division Addition 080.69012 38000 178 080 190 - Mid-Tex Gas Division Addition 080.69013 37602 30,128 080 190 - Mid-Tex Gas Division Addition 080.69014 37602 101,440 080 190 - Mid-Tex Gas Division Addition 080.69014 38000 2,071 080 190 - Mid-Tex Gas Division Addition 080.69015 37602 52,187 080 190 - Mid-Tex Gas Division Addition 080.69015 38000 5,798 080 190 - Mid-Tex Gas Division Addition 080.69016 37602 45,483 080 190 - Mid-Tex Gas Division Addition 080.69016 38000 11,371 080 190 - Mid-Tex Gas Division Addition 080.69024 37602 67,284 080 190 - Mid-Tex Gas Division Addition 080.69024 38000 11,874 080 190 - Mid-Tex Gas Division Addition 080.69026 37602 81,575 080 190 - Mid-Tex Gas Division Addition 080.69026 38000 20,394 080 190 - Mid-Tex Gas Division Addition 080.69051 37602 103,540 080 190 - Mid-Tex Gas Division Addition 080.69051 38000 25,885 080 190 - Mid-Tex Gas Division Addition 080.69052 37602 157,925 080 190 - Mid-Tex Gas Division Addition 080.69052 38000 17,547 080 190 - Mid-Tex Gas Division Addition 080.69056 37602 35,750 080 190 - Mid-Tex Gas Division Addition 080.69056 38000 6,309 080 190 - Mid-Tex Gas Division Addition 080.69057 37602 21,652 080 190 - Mid-Tex Gas Division Addition 080.69057 38000 21,652 080 190 - Mid-Tex Gas Division Addition 080.69061 38000 10,714 080 190 - Mid-Tex Gas Division Addition 080.69068 37602 374 080 190 - Mid-Tex Gas Division Addition 080.69077 37602 16,311 MTX Additions by FERC Page 51 of 101 449 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.69077 38000 858 080 190 - Mid-Tex Gas Division Addition 080.69089 37602 11,501 080 190 - Mid-Tex Gas Division Addition 080.69089 37800 356 080 190 - Mid-Tex Gas Division Addition 080.69101 37602 4,838 080 190 - Mid-Tex Gas Division Addition 080.69113 37800 1,264 080 190 - Mid-Tex Gas Division Addition 080.69116 37602 44,032 080 190 - Mid-Tex Gas Division Addition 080.69125 37602 4,868 080 190 - Mid-Tex Gas Division Addition 080.69125 37800 3,246 080 190 - Mid-Tex Gas Division Addition 080.69138 37602 543 080 190 - Mid-Tex Gas Division Addition 080.69159 37602 23,397 080 190 - Mid-Tex Gas Division Addition 080.69159 38000 446 080 190 - Mid-Tex Gas Division Addition 080.69161 37602 18,979 080 190 - Mid-Tex Gas Division Addition 080.69162 37602 20,521 080 190 - Mid-Tex Gas Division Addition 080.69162 38000 74 080 190 - Mid-Tex Gas Division Addition 080.69164 37602 8,461 080 190 - Mid-Tex Gas Division Addition 080.69167 37602 20,182 080 190 - Mid-Tex Gas Division Addition 080.69167 38000 6,727 080 190 - Mid-Tex Gas Division Addition 080.69168 37602 40,488 080 190 - Mid-Tex Gas Division Addition 080.69168 38000 2,131 080 190 - Mid-Tex Gas Division Addition 080.69169 37602 54,018 080 190 - Mid-Tex Gas Division Addition 080.69169 38000 18,006 080 190 - Mid-Tex Gas Division Addition 080.69170 37601 2,340 080 190 - Mid-Tex Gas Division Addition 080.69170 37800 24 080 190 - Mid-Tex Gas Division Addition 080.69171 37602 29,547 080 190 - Mid-Tex Gas Division Addition 080.69171 38000 12,663 080 190 - Mid-Tex Gas Division Addition 080.69172 37602 82,735 080 190 - Mid-Tex Gas Division Addition 080.69172 38000 20,684 080 190 - Mid-Tex Gas Division Addition 080.69173 37602 70,727 080 190 - Mid-Tex Gas Division Addition 080.69173 38000 23,576 080 190 - Mid-Tex Gas Division Addition 080.69176 37602 18,196 080 190 - Mid-Tex Gas Division Addition 080.69176 38000 2,022 080 190 - Mid-Tex Gas Division Addition 080.69177 37602 43,014 080 190 - Mid-Tex Gas Division Addition 080.69177 38000 28,676 080 190 - Mid-Tex Gas Division Addition 080.69178 37602 37,001 080 190 - Mid-Tex Gas Division Addition 080.69178 38000 24,667 080 190 - Mid-Tex Gas Division Addition 080.69179 37602 42,220 080 190 - Mid-Tex Gas Division Addition 080.69179 38000 10,555 080 190 - Mid-Tex Gas Division Addition 080.69180 37602 32,571 080 190 - Mid-Tex Gas Division Addition 080.69180 38000 8,143 080 190 - Mid-Tex Gas Division Addition 080.69181 37602 57,688 080 190 - Mid-Tex Gas Division Addition 080.69181 38000 938 080 190 - Mid-Tex Gas Division Addition 080.69196 37602 - 080 190 - Mid-Tex Gas Division Addition 080.69205 37602 14,194 080 190 - Mid-Tex Gas Division Addition 080.69205 38000 3,549 080 190 - Mid-Tex Gas Division Addition 080.69206 38000 83,741 080 190 - Mid-Tex Gas Division Addition 080.69207 37602 28,513 080 190 - Mid-Tex Gas Division Addition 080.69207 38000 19,008 080 190 - Mid-Tex Gas Division Addition 080.69208 37602 72,088 080 190 - Mid-Tex Gas Division Addition 080.69208 38000 1,023 080 190 - Mid-Tex Gas Division Addition 080.69209 37602 62,256 080 190 - Mid-Tex Gas Division Addition 080.69209 38000 15,564 080 190 - Mid-Tex Gas Division Addition 080.69212 37602 20,906 080 190 - Mid-Tex Gas Division Addition 080.69212 38000 1,301 080 190 - Mid-Tex Gas Division Addition 080.69213 37602 3,700 080 190 - Mid-Tex Gas Division Addition 080.69213 37800 2,465 080 190 - Mid-Tex Gas Division Addition 080.69220 37602 1,983 080 190 - Mid-Tex Gas Division Addition 080.69220 37800 1,322 080 190 - Mid-Tex Gas Division Addition 080.69221 37601 195,002 080 190 - Mid-Tex Gas Division Addition 080.69221 37602 1,716,020 080 190 - Mid-Tex Gas Division Addition 080.69221 38000 39,000 080 190 - Mid-Tex Gas Division Addition 080.69222 37602 1,329 080 190 - Mid-Tex Gas Division Addition 080.69224 37602 11,849 080 190 - Mid-Tex Gas Division Addition 080.69224 37800 627 080 190 - Mid-Tex Gas Division Addition 080.69226 37602 42,342 080 190 - Mid-Tex Gas Division Addition 080.69226 38000 28,228 080 190 - Mid-Tex Gas Division Addition 080.69227 37602 29,103 080 190 - Mid-Tex Gas Division Addition 080.69227 38000 29,103 080 190 - Mid-Tex Gas Division Addition 080.69235 37602 - 080 190 - Mid-Tex Gas Division Addition 080.69237 37602 966 080 190 - Mid-Tex Gas Division Addition 080.69241 37602 20,572 080 190 - Mid-Tex Gas Division Addition 080.69241 38000 6,857 080 190 - Mid-Tex Gas Division Addition 080.69248 37602 3,996 080 190 - Mid-Tex Gas Division Addition 080.69248 37800 3,995 080 190 - Mid-Tex Gas Division Addition 080.69262 37800 828 080 190 - Mid-Tex Gas Division Addition 080.69274 37602 33,485 080 190 - Mid-Tex Gas Division Addition 080.69275 37602 60,220 080 190 - Mid-Tex Gas Division Addition 080.69277 37602 16,193 080 190 - Mid-Tex Gas Division Addition 080.69277 38000 81 080 190 - Mid-Tex Gas Division Addition 080.69294 37602 530 080 190 - Mid-Tex Gas Division Addition 080.69302 37602 25,162 080 190 - Mid-Tex Gas Division Addition 080.69302 38000 16,774 080 190 - Mid-Tex Gas Division Addition 080.69303 37602 42,537 080 190 - Mid-Tex Gas Division Addition 080.69303 38000 18,230 080 190 - Mid-Tex Gas Division Addition 080.69304 37602 45,659 080 190 - Mid-Tex Gas Division Addition 080.69304 38000 19,568 080 190 - Mid-Tex Gas Division Addition 080.69312 37602 24,931 080 190 - Mid-Tex Gas Division Addition 080.69313 37602 22,300 080 190 - Mid-Tex Gas Division Addition 080.69313 38000 11,487 080 190 - Mid-Tex Gas Division Addition 080.69315 37602 111,195 080 190 - Mid-Tex Gas Division Addition 080.69316 37602 7,723 080 190 - Mid-Tex Gas Division Addition 080.69316 38000 858 080 190 - Mid-Tex Gas Division Addition 080.69317 37602 817 080 190 - Mid-Tex Gas Division Addition 080.69321 37602 11,752 080 190 - Mid-Tex Gas Division Addition 080.69323 37602 39,207 080 190 - Mid-Tex Gas Division Addition 080.69323 38000 2,951 080 190 - Mid-Tex Gas Division Addition 080.69331 37601 7,770 080 190 - Mid-Tex Gas Division Addition 080.69333 37602 11,856 080 190 - Mid-Tex Gas Division Addition 080.69341 37602 20,216 080 190 - Mid-Tex Gas Division Addition 080.69341 38000 3,851 080 190 - Mid-Tex Gas Division Addition 080.69344 37602 29,696 080 190 - Mid-Tex Gas Division Addition 080.69344 38000 8,870 080 190 - Mid-Tex Gas Division Addition 080.69349 37602 9,612 080 190 - Mid-Tex Gas Division Addition 080.69373 37602 19,922 080 190 - Mid-Tex Gas Division Addition 080.69373 37800 8,945 080 190 - Mid-Tex Gas Division Addition 080.69373 38000 2,033 080 190 - Mid-Tex Gas Division Addition 080.69375 37602 34,824 080 190 - Mid-Tex Gas Division Addition 080.69375 38000 711 MTX Additions by FERC Page 52 of 101 450 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.69378 38000 2,361 080 190 - Mid-Tex Gas Division Addition 080.69378 38100 3,541 080 190 - Mid-Tex Gas Division Addition 080.69404 37602 - 080 190 - Mid-Tex Gas Division Addition 080.69414 37602 30,018 080 190 - Mid-Tex Gas Division Addition 080.69417 37602 9,641 080 190 - Mid-Tex Gas Division Addition 080.69417 38000 728 080 190 - Mid-Tex Gas Division Addition 080.69420 37602 9,851 080 190 - Mid-Tex Gas Division Addition 080.69420 38000 1,947 080 190 - Mid-Tex Gas Division Addition 080.69426 37602 8,096 080 190 - Mid-Tex Gas Division Addition 080.69430 37602 37,415 080 190 - Mid-Tex Gas Division Addition 080.69430 38000 473 080 190 - Mid-Tex Gas Division Addition 080.69432 37602 8,957 080 190 - Mid-Tex Gas Division Addition 080.69433 37602 23,527 080 190 - Mid-Tex Gas Division Addition 080.69433 38000 497 080 190 - Mid-Tex Gas Division Addition 080.69434 37602 38,401 080 190 - Mid-Tex Gas Division Addition 080.69434 38000 509 080 190 - Mid-Tex Gas Division Addition 080.69435 37602 18,805 080 190 - Mid-Tex Gas Division Addition 080.69435 38000 6,269 080 190 - Mid-Tex Gas Division Addition 080.69436 37602 76,482 080 190 - Mid-Tex Gas Division Addition 080.69436 38000 8,498 080 190 - Mid-Tex Gas Division Addition 080.69437 37602 34,172 080 190 - Mid-Tex Gas Division Addition 080.69437 38000 697 080 190 - Mid-Tex Gas Division Addition 080.69438 37602 49,846 080 190 - Mid-Tex Gas Division Addition 080.69438 38000 8,797 080 190 - Mid-Tex Gas Division Addition 080.69439 37602 3,224 080 190 - Mid-Tex Gas Division Addition 080.69440 37602 2,506 080 190 - Mid-Tex Gas Division Addition 080.69440 38000 33,000 080 190 - Mid-Tex Gas Division Addition 080.69441 37602 63,837 080 190 - Mid-Tex Gas Division Addition 080.69441 38000 21,279 080 190 - Mid-Tex Gas Division Addition 080.69447 37602 8,349 080 190 - Mid-Tex Gas Division Addition 080.69447 38000 50 080 190 - Mid-Tex Gas Division Addition 080.69451 37602 259,356 080 190 - Mid-Tex Gas Division Addition 080.69469 37602 2,023 080 190 - Mid-Tex Gas Division Addition 080.69470 37602 32,725 080 190 - Mid-Tex Gas Division Addition 080.69470 38000 14,025 080 190 - Mid-Tex Gas Division Addition 080.69484 37602 5,401 080 190 - Mid-Tex Gas Division Addition 080.69491 37602 9,326 080 190 - Mid-Tex Gas Division Addition 080.69491 38000 94 080 190 - Mid-Tex Gas Division Addition 080.69504 37602 16,211 080 190 - Mid-Tex Gas Division Addition 080.69504 38000 1,801 080 190 - Mid-Tex Gas Division Addition 080.69519 38000 10,958 080 190 - Mid-Tex Gas Division Addition 080.69561 37602 7,999 080 190 - Mid-Tex Gas Division Addition 080.69561 38000 2,681 080 190 - Mid-Tex Gas Division Addition 080.69562 37602 157 080 190 - Mid-Tex Gas Division Addition 080.69563 37602 2,205 080 190 - Mid-Tex Gas Division Addition 080.69563 38000 735 080 190 - Mid-Tex Gas Division Addition 080.69569 37602 46,088 080 190 - Mid-Tex Gas Division Addition 080.69584 37602 6,418 080 190 - Mid-Tex Gas Division Addition 080.69584 37800 2,027 080 190 - Mid-Tex Gas Division Addition 080.69592 37602 1,198 080 190 - Mid-Tex Gas Division Addition 080.69592 37800 1,797 080 190 - Mid-Tex Gas Division Addition 080.69598 37602 10,345 080 190 - Mid-Tex Gas Division Addition 080.69598 38000 1,150 080 190 - Mid-Tex Gas Division Addition 080.69599 37602 10,381 080 190 - Mid-Tex Gas Division Addition 080.69599 37800 546 080 190 - Mid-Tex Gas Division Addition 080.69608 37602 1,586 080 190 - Mid-Tex Gas Division Addition 080.69622 37602 347 080 190 - Mid-Tex Gas Division Addition 080.69629 37602 2,458 080 190 - Mid-Tex Gas Division Addition 080.69631 37602 3,395 080 190 - Mid-Tex Gas Division Addition 080.69647 37602 956 080 190 - Mid-Tex Gas Division Addition 080.69666 37602 29,317 080 190 - Mid-Tex Gas Division Addition 080.69666 38000 3,258 080 190 - Mid-Tex Gas Division Addition 080.69673 37602 15,839 080 190 - Mid-Tex Gas Division Addition 080.69673 38000 1,760 080 190 - Mid-Tex Gas Division Addition 080.69675 37602 6,862 080 190 - Mid-Tex Gas Division Addition 080.69675 38000 10,092 080 190 - Mid-Tex Gas Division Addition 080.69676 37602 10,412 080 190 - Mid-Tex Gas Division Addition 080.69682 37602 - 080 190 - Mid-Tex Gas Division Addition 080.69687 37602 15,408 080 190 - Mid-Tex Gas Division Addition 080.69687 38000 6,603 080 190 - Mid-Tex Gas Division Addition 080.69695 37800 704 080 190 - Mid-Tex Gas Division Addition 080.69697 37602 27,248 080 190 - Mid-Tex Gas Division Addition 080.69697 38000 4,808 080 190 - Mid-Tex Gas Division Addition 080.69706 37800 535 080 190 - Mid-Tex Gas Division Addition 080.69707 37602 11,384 080 190 - Mid-Tex Gas Division Addition 080.69716 37602 6,095 080 190 - Mid-Tex Gas Division Addition 080.69719 37602 61,508 080 190 - Mid-Tex Gas Division Addition 080.69719 38000 12,600 080 190 - Mid-Tex Gas Division Addition 080.69720 37600 4,922 080 190 - Mid-Tex Gas Division Addition 080.69728 37602 5,760 080 190 - Mid-Tex Gas Division Addition 080.69740 37601 18,471 080 190 - Mid-Tex Gas Division Addition 080.69746 37602 9,321 080 190 - Mid-Tex Gas Division Addition 080.69753 37602 65,979 080 190 - Mid-Tex Gas Division Addition 080.69755 37601 1,421 080 190 - Mid-Tex Gas Division Addition 080.69755 37602 1,421 080 190 - Mid-Tex Gas Division Addition 080.69755 37800 1,421 080 190 - Mid-Tex Gas Division Addition 080.69755 38000 1,421 080 190 - Mid-Tex Gas Division Addition 080.69757 37800 6,907 080 190 - Mid-Tex Gas Division Addition 080.69759 37602 - 080 190 - Mid-Tex Gas Division Addition 080.69760 37601 20,999 080 190 - Mid-Tex Gas Division Addition 080.69760 37602 14,586 080 190 - Mid-Tex Gas Division Addition 080.69760 38000 14,586 080 190 - Mid-Tex Gas Division Addition 080.69761 37602 2,162 080 190 - Mid-Tex Gas Division Addition 080.69761 37800 19,454 080 190 - Mid-Tex Gas Division Addition 080.69779 37602 6,919 080 190 - Mid-Tex Gas Division Addition 080.69779 38000 1,730 080 190 - Mid-Tex Gas Division Addition 080.69783 37602 66,272 080 190 - Mid-Tex Gas Division Addition 080.69783 38000 534 080 190 - Mid-Tex Gas Division Addition 080.69785 37602 1,632 080 190 - Mid-Tex Gas Division Addition 080.69790 37602 5,309 080 190 - Mid-Tex Gas Division Addition 080.69790 38000 198 080 190 - Mid-Tex Gas Division Addition 080.69793 38000 16,613 080 190 - Mid-Tex Gas Division Addition 080.69803 37602 6,598 080 190 - Mid-Tex Gas Division Addition 080.69803 38000 1,165 080 190 - Mid-Tex Gas Division Addition 080.69813 37601 705 080 190 - Mid-Tex Gas Division Addition 080.69845 37601 1,660 080 190 - Mid-Tex Gas Division Addition 080.69845 37602 12,448 MTX Additions by FERC Page 53 of 101 451 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.69845 38000 2,489 080 190 - Mid-Tex Gas Division Addition 080.69850 37602 775 080 190 - Mid-Tex Gas Division Addition 080.69863 37602 21,814 080 190 - Mid-Tex Gas Division Addition 080.69873 37602 1,352 080 190 - Mid-Tex Gas Division Addition 080.69884 37602 - 080 190 - Mid-Tex Gas Division Addition 080.69887 37602 454 080 190 - Mid-Tex Gas Division Addition 080.69896 37602 3,477 080 190 - Mid-Tex Gas Division Addition 080.69896 38000 183 080 190 - Mid-Tex Gas Division Addition 080.69904 37602 7,154 080 190 - Mid-Tex Gas Division Addition 080.69907 37602 2,806 080 190 - Mid-Tex Gas Division Addition 080.69907 38000 312 080 190 - Mid-Tex Gas Division Addition 080.69911 37602 - 080 190 - Mid-Tex Gas Division Addition 080.69912 37602 6,238 080 190 - Mid-Tex Gas Division Addition 080.69912 38000 3,359 080 190 - Mid-Tex Gas Division Addition 080.69922 37602 1,175 080 190 - Mid-Tex Gas Division Addition 080.69925 37602 1,987 080 190 - Mid-Tex Gas Division Addition 080.69929 37602 - 080 190 - Mid-Tex Gas Division Addition 080.69930 37602 - 080 190 - Mid-Tex Gas Division Addition 080.69932 37602 (29,040) 080 190 - Mid-Tex Gas Division Addition 080.69932 38000 (7,260) 080 190 - Mid-Tex Gas Division Addition 080.69934 37602 5,994 080 190 - Mid-Tex Gas Division Addition 080.69940 37602 2,681 080 190 - Mid-Tex Gas Division Addition 080.69940 38000 298 080 190 - Mid-Tex Gas Division Addition 080.69956 37602 3,928 080 190 - Mid-Tex Gas Division Addition 080.69957 37602 8,242 080 190 - Mid-Tex Gas Division Addition 080.69957 38000 1,244 080 190 - Mid-Tex Gas Division Addition 080.69958 37602 23,774 080 190 - Mid-Tex Gas Division Addition 080.69958 38000 17,934 080 190 - Mid-Tex Gas Division Addition 080.69962 37602 7,995 080 190 - Mid-Tex Gas Division Addition 080.69967 37800 4,488 080 190 - Mid-Tex Gas Division Addition 080.69978 37602 8,479 080 190 - Mid-Tex Gas Division Addition 080.69978 38000 446 080 190 - Mid-Tex Gas Division Addition 080.69981 37602 10,714 080 190 - Mid-Tex Gas Division Addition 080.69999 37602 340 080 190 - Mid-Tex Gas Division Addition 080.70009 37800 4,415 080 190 - Mid-Tex Gas Division Addition 080.70046 37602 287,224 080 190 - Mid-Tex Gas Division Addition 080.70066 37600 8,642 080 190 - Mid-Tex Gas Division Addition 080.70083 37602 31,164 080 190 - Mid-Tex Gas Division Addition 080.70094 37602 10,446 080 190 - Mid-Tex Gas Division Addition 080.70094 38000 8,356 080 190 - Mid-Tex Gas Division Addition 080.70099 37602 1,386 080 190 - Mid-Tex Gas Division Addition 080.70099 37800 1,995 080 190 - Mid-Tex Gas Division Addition 080.70104 37602 54,948 080 190 - Mid-Tex Gas Division Addition 080.70106 37602 807 080 190 - Mid-Tex Gas Division Addition 080.70121 37602 1,538 080 190 - Mid-Tex Gas Division Addition 080.70121 38000 81 080 190 - Mid-Tex Gas Division Addition 080.70123 37602 12,800 080 190 - Mid-Tex Gas Division Addition 080.70124 37800 331 080 190 - Mid-Tex Gas Division Addition 080.70126 37602 10,064 080 190 - Mid-Tex Gas Division Addition 080.70128 37602 13,561 080 190 - Mid-Tex Gas Division Addition 080.70132 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70137 38500 4,936 080 190 - Mid-Tex Gas Division Addition 080.70139 37800 326 080 190 - Mid-Tex Gas Division Addition 080.70141 37602 11,482 080 190 - Mid-Tex Gas Division Addition 080.70142 37602 3,395 080 190 - Mid-Tex Gas Division Addition 080.70144 37601 548 080 190 - Mid-Tex Gas Division Addition 080.70149 37602 14,600 080 190 - Mid-Tex Gas Division Addition 080.70149 38000 608 080 190 - Mid-Tex Gas Division Addition 080.70155 37601 737 080 190 - Mid-Tex Gas Division Addition 080.70155 37800 737 080 190 - Mid-Tex Gas Division Addition 080.70158 37602 2,436 080 190 - Mid-Tex Gas Division Addition 080.70161 37602 83,890 080 190 - Mid-Tex Gas Division Addition 080.70162 37602 4,512 080 190 - Mid-Tex Gas Division Addition 080.70166 37800 1,460 080 190 - Mid-Tex Gas Division Addition 080.70169 37602 14,813 080 190 - Mid-Tex Gas Division Addition 080.70169 38000 3,474 080 190 - Mid-Tex Gas Division Addition 080.70173 37800 1,294 080 190 - Mid-Tex Gas Division Addition 080.70176 37602 9,802 080 190 - Mid-Tex Gas Division Addition 080.70189 37602 276,885 080 190 - Mid-Tex Gas Division Addition 080.70193 37601 (0) 080 190 - Mid-Tex Gas Division Addition 080.70193 37602 1,366,620 080 190 - Mid-Tex Gas Division Addition 080.70194 37601 155,321 080 190 - Mid-Tex Gas Division Addition 080.70194 37602 4,070,023 080 190 - Mid-Tex Gas Division Addition 080.70195 37601 (2,202,405) 080 190 - Mid-Tex Gas Division Addition 080.70195 37602 5,363,062 080 190 - Mid-Tex Gas Division Addition 080.70195 38300 1,739 080 190 - Mid-Tex Gas Division Addition 080.70196 37601 0 080 190 - Mid-Tex Gas Division Addition 080.70196 37602 5,531,349 080 190 - Mid-Tex Gas Division Addition 080.70197 37601 379,121 080 190 - Mid-Tex Gas Division Addition 080.70197 37602 2,277,538 080 190 - Mid-Tex Gas Division Addition 080.70198 37601 0 080 190 - Mid-Tex Gas Division Addition 080.70198 37602 304,258 080 190 - Mid-Tex Gas Division Addition 080.70199 37601 166,809 080 190 - Mid-Tex Gas Division Addition 080.70199 37602 199,357 080 190 - Mid-Tex Gas Division Addition 080.70200 37601 - 080 190 - Mid-Tex Gas Division Addition 080.70200 37602 1,306,886 080 190 - Mid-Tex Gas Division Addition 080.70201 37601 269,675 080 190 - Mid-Tex Gas Division Addition 080.70201 37602 21,456,174 080 190 - Mid-Tex Gas Division Addition 080.70201 38100 33,833 080 190 - Mid-Tex Gas Division Addition 080.70201 38300 3,483 080 190 - Mid-Tex Gas Division Addition 080.70202 38000 2,666,062 080 190 - Mid-Tex Gas Division Addition 080.70203 38000 3,876,827 080 190 - Mid-Tex Gas Division Addition 080.70203 38100 51,434 080 190 - Mid-Tex Gas Division Addition 080.70203 38300 775 080 190 - Mid-Tex Gas Division Addition 080.70204 38000 5,545,613 080 190 - Mid-Tex Gas Division Addition 080.70205 38000 3,724,182 080 190 - Mid-Tex Gas Division Addition 080.70205 38300 983 080 190 - Mid-Tex Gas Division Addition 080.70206 38000 3,157,906 080 190 - Mid-Tex Gas Division Addition 080.70206 38300 1,196 080 190 - Mid-Tex Gas Division Addition 080.70207 38000 317,300 080 190 - Mid-Tex Gas Division Addition 080.70208 38000 1,890,367 080 190 - Mid-Tex Gas Division Addition 080.70209 38000 242,243 080 190 - Mid-Tex Gas Division Addition 080.70210 38000 9,376,752 080 190 - Mid-Tex Gas Division Addition 080.70211 37601 1,198,669 080 190 - Mid-Tex Gas Division Addition 080.70211 37602 803,236 080 190 - Mid-Tex Gas Division Addition 080.70212 37601 120,257 080 190 - Mid-Tex Gas Division Addition 080.70212 37602 4,710,078 MTX Additions by FERC Page 54 of 101 452 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.70213 37601 3,315,619 080 190 - Mid-Tex Gas Division Addition 080.70213 37602 7,420,039 080 190 - Mid-Tex Gas Division Addition 080.70213 38300 30,869 080 190 - Mid-Tex Gas Division Addition 080.70214 37601 4,407,049 080 190 - Mid-Tex Gas Division Addition 080.70214 37602 3,532,099 080 190 - Mid-Tex Gas Division Addition 080.70215 37601 3,348,231 080 190 - Mid-Tex Gas Division Addition 080.70215 37602 1,071,736 080 190 - Mid-Tex Gas Division Addition 080.70215 38300 24,440 080 190 - Mid-Tex Gas Division Addition 080.70216 37601 1,364,510 080 190 - Mid-Tex Gas Division Addition 080.70216 37602 586,213 080 190 - Mid-Tex Gas Division Addition 080.70217 37601 2,928,347 080 190 - Mid-Tex Gas Division Addition 080.70217 37602 573,946 080 190 - Mid-Tex Gas Division Addition 080.70218 37601 367,943 080 190 - Mid-Tex Gas Division Addition 080.70218 37602 1,196,223 080 190 - Mid-Tex Gas Division Addition 080.70218 38100 65,459 080 190 - Mid-Tex Gas Division Addition 080.70218 38300 6,963 080 190 - Mid-Tex Gas Division Addition 080.70219 37601 1,147,090 080 190 - Mid-Tex Gas Division Addition 080.70219 37602 4,876,589 080 190 - Mid-Tex Gas Division Addition 080.70220 38000 4,605,053 080 190 - Mid-Tex Gas Division Addition 080.70220 38300 12,926 080 190 - Mid-Tex Gas Division Addition 080.70221 38000 3,985,311 080 190 - Mid-Tex Gas Division Addition 080.70221 38300 5,908 080 190 - Mid-Tex Gas Division Addition 080.70222 38000 9,045,998 080 190 - Mid-Tex Gas Division Addition 080.70222 38100 93,555 080 190 - Mid-Tex Gas Division Addition 080.70222 38300 18,177 080 190 - Mid-Tex Gas Division Addition 080.70223 38000 15,729,885 080 190 - Mid-Tex Gas Division Addition 080.70224 38000 3,855,462 080 190 - Mid-Tex Gas Division Addition 080.70224 38300 9,512 080 190 - Mid-Tex Gas Division Addition 080.70225 38000 2,523,550 080 190 - Mid-Tex Gas Division Addition 080.70226 38000 5,364,278 080 190 - Mid-Tex Gas Division Addition 080.70227 38000 2,204,967 080 190 - Mid-Tex Gas Division Addition 080.70228 38000 3,173,607 080 190 - Mid-Tex Gas Division Addition 080.70229 38100 1,730,993 080 190 - Mid-Tex Gas Division Addition 080.70229 38200 4,685,672 080 190 - Mid-Tex Gas Division Addition 080.70229 38300 15,938 080 190 - Mid-Tex Gas Division Addition 080.70230 38100 1,991,345 080 190 - Mid-Tex Gas Division Addition 080.70230 38200 4,522,637 080 190 - Mid-Tex Gas Division Addition 080.70230 38300 6,302 080 190 - Mid-Tex Gas Division Addition 080.70231 38100 1,492,562 080 190 - Mid-Tex Gas Division Addition 080.70231 38200 2,625,462 080 190 - Mid-Tex Gas Division Addition 080.70231 38300 1,916 080 190 - Mid-Tex Gas Division Addition 080.70232 38100 3,144,980 080 190 - Mid-Tex Gas Division Addition 080.70232 38200 9,360,259 080 190 - Mid-Tex Gas Division Addition 080.70232 38300 78,384 080 190 - Mid-Tex Gas Division Addition 080.70233 38100 1,294,274 080 190 - Mid-Tex Gas Division Addition 080.70233 38200 3,651,218 080 190 - Mid-Tex Gas Division Addition 080.70233 38300 42,750 080 190 - Mid-Tex Gas Division Addition 080.70234 38100 858,611 080 190 - Mid-Tex Gas Division Addition 080.70234 38200 2,008,935 080 190 - Mid-Tex Gas Division Addition 080.70234 38300 (9,196) 080 190 - Mid-Tex Gas Division Addition 080.70235 38100 1,423,102 080 190 - Mid-Tex Gas Division Addition 080.70235 38200 3,649,708 080 190 - Mid-Tex Gas Division Addition 080.70235 38300 1,104 080 190 - Mid-Tex Gas Division Addition 080.70236 38100 1,387,893 080 190 - Mid-Tex Gas Division Addition 080.70236 38200 1,515,479 080 190 - Mid-Tex Gas Division Addition 080.70236 38300 1,152,918 080 190 - Mid-Tex Gas Division Addition 080.70237 38100 1,026,704 080 190 - Mid-Tex Gas Division Addition 080.70237 38200 2,574,045 080 190 - Mid-Tex Gas Division Addition 080.70237 38300 9,713 080 190 - Mid-Tex Gas Division Addition 080.70249 37602 3,362 080 190 - Mid-Tex Gas Division Addition 080.70249 37800 7,845 080 190 - Mid-Tex Gas Division Addition 080.70252 37602 3,915 080 190 - Mid-Tex Gas Division Addition 080.70252 38000 859 080 190 - Mid-Tex Gas Division Addition 080.70254 37602 6,606 080 190 - Mid-Tex Gas Division Addition 080.70254 38000 734 080 190 - Mid-Tex Gas Division Addition 080.70256 37602 2,011 080 190 - Mid-Tex Gas Division Addition 080.70258 37602 5,584 080 190 - Mid-Tex Gas Division Addition 080.70258 38000 1,396 080 190 - Mid-Tex Gas Division Addition 080.70259 37602 445 080 190 - Mid-Tex Gas Division Addition 080.70259 37800 21,827 080 190 - Mid-Tex Gas Division Addition 080.70260 37602 7,458 080 190 - Mid-Tex Gas Division Addition 080.70260 37800 7,458 080 190 - Mid-Tex Gas Division Addition 080.70260 38000 1,657 080 190 - Mid-Tex Gas Division Addition 080.70268 37602 2,618 080 190 - Mid-Tex Gas Division Addition 080.70272 37602 19,780 080 190 - Mid-Tex Gas Division Addition 080.70274 37601 15,926 080 190 - Mid-Tex Gas Division Addition 080.70275 37602 4,134 080 190 - Mid-Tex Gas Division Addition 080.70277 37601 18,937 080 190 - Mid-Tex Gas Division Addition 080.70285 37800 44 080 190 - Mid-Tex Gas Division Addition 080.70289 38000 8,387,690 080 190 - Mid-Tex Gas Division Addition 080.70290 38000 9,781,927 080 190 - Mid-Tex Gas Division Addition 080.70290 38300 24,844 080 190 - Mid-Tex Gas Division Addition 080.70291 38000 8,310,644 080 190 - Mid-Tex Gas Division Addition 080.70291 38300 4,477 080 190 - Mid-Tex Gas Division Addition 080.70292 38000 11,129,991 080 190 - Mid-Tex Gas Division Addition 080.70292 38100 359,791 080 190 - Mid-Tex Gas Division Addition 080.70292 38300 13,363 080 190 - Mid-Tex Gas Division Addition 080.70293 38000 4,594,617 080 190 - Mid-Tex Gas Division Addition 080.70294 38000 11,888,683 080 190 - Mid-Tex Gas Division Addition 080.70294 38100 29,557 080 190 - Mid-Tex Gas Division Addition 080.70294 38300 699 080 190 - Mid-Tex Gas Division Addition 080.70295 38000 10,077,022 080 190 - Mid-Tex Gas Division Addition 080.70296 38000 4,468,104 080 190 - Mid-Tex Gas Division Addition 080.70297 38000 1,897,312 080 190 - Mid-Tex Gas Division Addition 080.70298 38100 1,252,742 080 190 - Mid-Tex Gas Division Addition 080.70298 38200 2,185,208 080 190 - Mid-Tex Gas Division Addition 080.70298 38300 26,763 080 190 - Mid-Tex Gas Division Addition 080.70299 38100 1,773,207 080 190 - Mid-Tex Gas Division Addition 080.70299 38200 2,683,525 080 190 - Mid-Tex Gas Division Addition 080.70299 38300 30,345 080 190 - Mid-Tex Gas Division Addition 080.70300 38100 1,337,668 080 190 - Mid-Tex Gas Division Addition 080.70300 38200 2,185,097 080 190 - Mid-Tex Gas Division Addition 080.70300 38300 31,816 080 190 - Mid-Tex Gas Division Addition 080.70301 38100 867,346 080 190 - Mid-Tex Gas Division Addition 080.70301 38200 882,282 080 190 - Mid-Tex Gas Division Addition 080.70301 38300 54,550 080 190 - Mid-Tex Gas Division Addition 080.70302 38100 827,291 MTX Additions by FERC Page 55 of 101 453 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.70302 38200 1,253,087 080 190 - Mid-Tex Gas Division Addition 080.70302 38300 25,653 080 190 - Mid-Tex Gas Division Addition 080.70303 38100 1,400,411 080 190 - Mid-Tex Gas Division Addition 080.70303 38200 2,955,043 080 190 - Mid-Tex Gas Division Addition 080.70303 38300 18,071 080 190 - Mid-Tex Gas Division Addition 080.70304 38100 1,113,851 080 190 - Mid-Tex Gas Division Addition 080.70304 38200 1,682,404 080 190 - Mid-Tex Gas Division Addition 080.70304 38300 22,600 080 190 - Mid-Tex Gas Division Addition 080.70305 38100 933,942 080 190 - Mid-Tex Gas Division Addition 080.70305 38200 514,403 080 190 - Mid-Tex Gas Division Addition 080.70305 38300 297,987 080 190 - Mid-Tex Gas Division Addition 080.70306 38100 299,589 080 190 - Mid-Tex Gas Division Addition 080.70306 38200 374,934 080 190 - Mid-Tex Gas Division Addition 080.70306 38300 16,760 080 190 - Mid-Tex Gas Division Addition 080.70307 38000 853,716 080 190 - Mid-Tex Gas Division Addition 080.70308 38000 1,215,332 080 190 - Mid-Tex Gas Division Addition 080.70308 38300 673 080 190 - Mid-Tex Gas Division Addition 080.70309 38000 1,844,031 080 190 - Mid-Tex Gas Division Addition 080.70309 38300 2,011 080 190 - Mid-Tex Gas Division Addition 080.70310 38000 359,719 080 190 - Mid-Tex Gas Division Addition 080.70311 38000 889,608 080 190 - Mid-Tex Gas Division Addition 080.70312 38000 576,280 080 190 - Mid-Tex Gas Division Addition 080.70313 38000 897,559 080 190 - Mid-Tex Gas Division Addition 080.70314 38000 1,058,094 080 190 - Mid-Tex Gas Division Addition 080.70314 38100 9,416 080 190 - Mid-Tex Gas Division Addition 080.70314 38300 1,107 080 190 - Mid-Tex Gas Division Addition 080.70315 38000 481,848 080 190 - Mid-Tex Gas Division Addition 080.70316 37601 439,839 080 190 - Mid-Tex Gas Division Addition 080.70316 37602 206,192 080 190 - Mid-Tex Gas Division Addition 080.70317 37601 622,223 080 190 - Mid-Tex Gas Division Addition 080.70317 37602 509,670 080 190 - Mid-Tex Gas Division Addition 080.70318 37601 383,054 080 190 - Mid-Tex Gas Division Addition 080.70318 37602 701,009 080 190 - Mid-Tex Gas Division Addition 080.70319 37601 292,774 080 190 - Mid-Tex Gas Division Addition 080.70319 37602 79,195 080 190 - Mid-Tex Gas Division Addition 080.70320 37601 438,973 080 190 - Mid-Tex Gas Division Addition 080.70320 37602 193,939 080 190 - Mid-Tex Gas Division Addition 080.70321 37601 361,194 080 190 - Mid-Tex Gas Division Addition 080.70321 37602 31,587 080 190 - Mid-Tex Gas Division Addition 080.70322 37601 490,133 080 190 - Mid-Tex Gas Division Addition 080.70322 37602 143,272 080 190 - Mid-Tex Gas Division Addition 080.70323 37601 - 080 190 - Mid-Tex Gas Division Addition 080.70323 37602 640,455 080 190 - Mid-Tex Gas Division Addition 080.70324 37601 642,577 080 190 - Mid-Tex Gas Division Addition 080.70324 37602 20,578 080 190 - Mid-Tex Gas Division Addition 080.70325 38100 415,641 080 190 - Mid-Tex Gas Division Addition 080.70325 38200 1,217,411 080 190 - Mid-Tex Gas Division Addition 080.70325 38300 29,409 080 190 - Mid-Tex Gas Division Addition 080.70326 38100 427,335 080 190 - Mid-Tex Gas Division Addition 080.70326 38200 882,438 080 190 - Mid-Tex Gas Division Addition 080.70326 38300 11,833 080 190 - Mid-Tex Gas Division Addition 080.70327 38100 476,199 080 190 - Mid-Tex Gas Division Addition 080.70327 38200 1,609,255 080 190 - Mid-Tex Gas Division Addition 080.70327 38300 21,928 080 190 - Mid-Tex Gas Division Addition 080.70328 38100 386,512 080 190 - Mid-Tex Gas Division Addition 080.70328 38200 377,728 080 190 - Mid-Tex Gas Division Addition 080.70328 38300 9,385 080 190 - Mid-Tex Gas Division Addition 080.70329 38100 524,305 080 190 - Mid-Tex Gas Division Addition 080.70329 38200 845,338 080 190 - Mid-Tex Gas Division Addition 080.70329 38300 15,030 080 190 - Mid-Tex Gas Division Addition 080.70330 38100 214,945 080 190 - Mid-Tex Gas Division Addition 080.70330 38200 283,340 080 190 - Mid-Tex Gas Division Addition 080.70330 38300 5,990 080 190 - Mid-Tex Gas Division Addition 080.70331 38100 417,223 080 190 - Mid-Tex Gas Division Addition 080.70331 38200 755,741 080 190 - Mid-Tex Gas Division Addition 080.70331 38300 10,263 080 190 - Mid-Tex Gas Division Addition 080.70332 38100 392,515 080 190 - Mid-Tex Gas Division Addition 080.70332 38200 335,815 080 190 - Mid-Tex Gas Division Addition 080.70332 38300 172,152 080 190 - Mid-Tex Gas Division Addition 080.70333 38100 454,773 080 190 - Mid-Tex Gas Division Addition 080.70333 38200 1,058,443 080 190 - Mid-Tex Gas Division Addition 080.70333 38300 7,826 080 190 - Mid-Tex Gas Division Addition 080.70334 37600 1,167,247 080 190 - Mid-Tex Gas Division Addition 080.70335 37600 421,342 080 190 - Mid-Tex Gas Division Addition 080.70336 37600 2,319,101 080 190 - Mid-Tex Gas Division Addition 080.70337 37600 8,745,348 080 190 - Mid-Tex Gas Division Addition 080.70338 37600 1,571,867 080 190 - Mid-Tex Gas Division Addition 080.70339 37600 465,870 080 190 - Mid-Tex Gas Division Addition 080.70340 37600 1,309,290 080 190 - Mid-Tex Gas Division Addition 080.70341 37600 571,098 080 190 - Mid-Tex Gas Division Addition 080.70342 37600 1,547,412 080 190 - Mid-Tex Gas Division Addition 080.70343 37602 7,127 080 190 - Mid-Tex Gas Division Addition 080.70343 38000 455 080 190 - Mid-Tex Gas Division Addition 080.70344 37601 45,909 080 190 - Mid-Tex Gas Division Addition 080.70347 37602 (216) 080 190 - Mid-Tex Gas Division Addition 080.70350 37602 574,232 080 190 - Mid-Tex Gas Division Addition 080.70355 37601 47,960 080 190 - Mid-Tex Gas Division Addition 080.70361 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70377 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70379 37602 11,431 080 190 - Mid-Tex Gas Division Addition 080.70379 38000 2,858 080 190 - Mid-Tex Gas Division Addition 080.70384 37602 8,317 080 190 - Mid-Tex Gas Division Addition 080.70405 37601 128 080 190 - Mid-Tex Gas Division Addition 080.70405 37602 71,856 080 190 - Mid-Tex Gas Division Addition 080.70405 38000 10,384 080 190 - Mid-Tex Gas Division Addition 080.70406 37602 (164,925) 080 190 - Mid-Tex Gas Division Addition 080.70409 37602 912 080 190 - Mid-Tex Gas Division Addition 080.70412 38000 12,564 080 190 - Mid-Tex Gas Division Addition 080.70436 37602 10,500 080 190 - Mid-Tex Gas Division Addition 080.70436 38000 1,500 080 190 - Mid-Tex Gas Division Addition 080.70437 37602 (69) 080 190 - Mid-Tex Gas Division Addition 080.70438 37602 2,936 080 190 - Mid-Tex Gas Division Addition 080.70443 37602 (132) 080 190 - Mid-Tex Gas Division Addition 080.70444 37601 (62,295) 080 190 - Mid-Tex Gas Division Addition 080.70447 37602 29,909 080 190 - Mid-Tex Gas Division Addition 080.70447 38000 12,818 080 190 - Mid-Tex Gas Division Addition 080.70449 37800 1,780 MTX Additions by FERC Page 56 of 101 454 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.70450 37602 670 080 190 - Mid-Tex Gas Division Addition 080.70455 37601 33,380 080 190 - Mid-Tex Gas Division Addition 080.70455 38000 1,757 080 190 - Mid-Tex Gas Division Addition 080.70462 37602 801 080 190 - Mid-Tex Gas Division Addition 080.70470 37800 1,181 080 190 - Mid-Tex Gas Division Addition 080.70473 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70475 37602 2,265 080 190 - Mid-Tex Gas Division Addition 080.70476 37602 4,530 080 190 - Mid-Tex Gas Division Addition 080.70476 37800 6,231 080 190 - Mid-Tex Gas Division Addition 080.70476 38000 566 080 190 - Mid-Tex Gas Division Addition 080.70477 37602 2,866 080 190 - Mid-Tex Gas Division Addition 080.70477 37800 2,865 080 190 - Mid-Tex Gas Division Addition 080.70478 37602 17,317 080 190 - Mid-Tex Gas Division Addition 080.70479 37602 3,536 080 190 - Mid-Tex Gas Division Addition 080.70479 37800 4,929 080 190 - Mid-Tex Gas Division Addition 080.70492 37602 84,617 080 190 - Mid-Tex Gas Division Addition 080.70492 38000 - 080 190 - Mid-Tex Gas Division Addition 080.70498 37602 4,704 080 190 - Mid-Tex Gas Division Addition 080.70498 38000 247 080 190 - Mid-Tex Gas Division Addition 080.70502 37602 11,770 080 190 - Mid-Tex Gas Division Addition 080.70504 37601 915 080 190 - Mid-Tex Gas Division Addition 080.70504 37602 14,643 080 190 - Mid-Tex Gas Division Addition 080.70504 38000 2,745 080 190 - Mid-Tex Gas Division Addition 080.70505 37602 4,969 080 190 - Mid-Tex Gas Division Addition 080.70511 37602 1,177 080 190 - Mid-Tex Gas Division Addition 080.70511 37800 2,118 080 190 - Mid-Tex Gas Division Addition 080.70512 37602 1,777 080 190 - Mid-Tex Gas Division Addition 080.70512 37800 4,147 080 190 - Mid-Tex Gas Division Addition 080.70515 37602 34,282 080 190 - Mid-Tex Gas Division Addition 080.70515 38000 3,391 080 190 - Mid-Tex Gas Division Addition 080.70520 37602 (25) 080 190 - Mid-Tex Gas Division Addition 080.70522 37602 6,344 080 190 - Mid-Tex Gas Division Addition 080.70523 37602 12,843 080 190 - Mid-Tex Gas Division Addition 080.70523 38000 3,211 080 190 - Mid-Tex Gas Division Addition 080.70524 37602 11,038 080 190 - Mid-Tex Gas Division Addition 080.70524 38000 2,759 080 190 - Mid-Tex Gas Division Addition 080.70526 37602 450 080 190 - Mid-Tex Gas Division Addition 080.70526 37800 2,248 080 190 - Mid-Tex Gas Division Addition 080.70526 38000 300 080 190 - Mid-Tex Gas Division Addition 080.70527 37602 1,289 080 190 - Mid-Tex Gas Division Addition 080.70527 37800 1,934 080 190 - Mid-Tex Gas Division Addition 080.70528 37602 3,682 080 190 - Mid-Tex Gas Division Addition 080.70528 37800 5,523 080 190 - Mid-Tex Gas Division Addition 080.70529 37602 2,982 080 190 - Mid-Tex Gas Division Addition 080.70529 38000 331 080 190 - Mid-Tex Gas Division Addition 080.70530 37602 743 080 190 - Mid-Tex Gas Division Addition 080.70530 37800 14,117 080 190 - Mid-Tex Gas Division Addition 080.70531 37602 430 080 190 - Mid-Tex Gas Division Addition 080.70531 37800 3,868 080 190 - Mid-Tex Gas Division Addition 080.70532 37602 895 080 190 - Mid-Tex Gas Division Addition 080.70532 37800 8,053 080 190 - Mid-Tex Gas Division Addition 080.70533 37602 2,751 080 190 - Mid-Tex Gas Division Addition 080.70533 37800 5,110 080 190 - Mid-Tex Gas Division Addition 080.70534 37602 7,123 080 190 - Mid-Tex Gas Division Addition 080.70534 37800 1,257 080 190 - Mid-Tex Gas Division Addition 080.70535 37602 2,845 080 190 - Mid-Tex Gas Division Addition 080.70535 37800 4,268 080 190 - Mid-Tex Gas Division Addition 080.70536 37602 3,723 080 190 - Mid-Tex Gas Division Addition 080.70536 37800 2,482 080 190 - Mid-Tex Gas Division Addition 080.70537 37602 7,093 080 190 - Mid-Tex Gas Division Addition 080.70537 37800 4,033 080 190 - Mid-Tex Gas Division Addition 080.70538 37602 16,492 080 190 - Mid-Tex Gas Division Addition 080.70538 38000 4,123 080 190 - Mid-Tex Gas Division Addition 080.70539 37602 4,928 080 190 - Mid-Tex Gas Division Addition 080.70539 37800 6,023 080 190 - Mid-Tex Gas Division Addition 080.70540 37602 5,402 080 190 - Mid-Tex Gas Division Addition 080.70540 37800 12,605 080 190 - Mid-Tex Gas Division Addition 080.70541 37602 46,893 080 190 - Mid-Tex Gas Division Addition 080.70541 38000 5,210 080 190 - Mid-Tex Gas Division Addition 080.70542 37602 2,769 080 190 - Mid-Tex Gas Division Addition 080.70542 37800 1,186 080 190 - Mid-Tex Gas Division Addition 080.70543 37602 828 080 190 - Mid-Tex Gas Division Addition 080.70543 37800 4,695 080 190 - Mid-Tex Gas Division Addition 080.70544 37602 1,369 080 190 - Mid-Tex Gas Division Addition 080.70544 37800 4,855 080 190 - Mid-Tex Gas Division Addition 080.70545 37602 1,580 080 190 - Mid-Tex Gas Division Addition 080.70545 37800 3,687 080 190 - Mid-Tex Gas Division Addition 080.70546 37602 197,377 080 190 - Mid-Tex Gas Division Addition 080.70546 38000 21,931 080 190 - Mid-Tex Gas Division Addition 080.70547 37602 1,078 080 190 - Mid-Tex Gas Division Addition 080.70547 37800 3,233 080 190 - Mid-Tex Gas Division Addition 080.70548 37602 98,380 080 190 - Mid-Tex Gas Division Addition 080.70548 38000 10,931 080 190 - Mid-Tex Gas Division Addition 080.70549 37602 1,756 080 190 - Mid-Tex Gas Division Addition 080.70549 37800 3,262 080 190 - Mid-Tex Gas Division Addition 080.70551 37602 30,028 080 190 - Mid-Tex Gas Division Addition 080.70551 38000 3,337 080 190 - Mid-Tex Gas Division Addition 080.70552 37602 792 080 190 - Mid-Tex Gas Division Addition 080.70552 37800 3,129 080 190 - Mid-Tex Gas Division Addition 080.70552 38000 40 080 190 - Mid-Tex Gas Division Addition 080.70553 37602 4,279 080 190 - Mid-Tex Gas Division Addition 080.70553 37800 4,546 080 190 - Mid-Tex Gas Division Addition 080.70553 38000 89 080 190 - Mid-Tex Gas Division Addition 080.70554 37602 5,936 080 190 - Mid-Tex Gas Division Addition 080.70554 37800 5,564 080 190 - Mid-Tex Gas Division Addition 080.70554 38000 866 080 190 - Mid-Tex Gas Division Addition 080.70555 37602 14,746 080 190 - Mid-Tex Gas Division Addition 080.70555 38000 941 080 190 - Mid-Tex Gas Division Addition 080.70557 37602 10,639 080 190 - Mid-Tex Gas Division Addition 080.70557 38000 3,546 080 190 - Mid-Tex Gas Division Addition 080.70560 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70562 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70564 37602 31,888 080 190 - Mid-Tex Gas Division Addition 080.70564 38000 986 080 190 - Mid-Tex Gas Division Addition 080.70566 37602 22,197 080 190 - Mid-Tex Gas Division Addition 080.70566 38000 5,549 080 190 - Mid-Tex Gas Division Addition 080.70575 38000 6,291 MTX Additions by FERC Page 57 of 101 455 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.70575 38500 6,044 080 190 - Mid-Tex Gas Division Addition 080.70576 37602 (123,592) 080 190 - Mid-Tex Gas Division Addition 080.70577 37602 452 080 190 - Mid-Tex Gas Division Addition 080.70582 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70583 37602 1,074 080 190 - Mid-Tex Gas Division Addition 080.70585 37602 679 080 190 - Mid-Tex Gas Division Addition 080.70587 37601 - 080 190 - Mid-Tex Gas Division Addition 080.70590 37602 (96,432) 080 190 - Mid-Tex Gas Division Addition 080.70594 37602 214 080 190 - Mid-Tex Gas Division Addition 080.70595 37600 62,126 080 190 - Mid-Tex Gas Division Addition 080.70595 37601 484,578 080 190 - Mid-Tex Gas Division Addition 080.70595 37602 323,055 080 190 - Mid-Tex Gas Division Addition 080.70595 37800 372,756 080 190 - Mid-Tex Gas Division Addition 080.70596 37602 37,539 080 190 - Mid-Tex Gas Division Addition 080.70597 37602 1,059 080 190 - Mid-Tex Gas Division Addition 080.70598 37602 152 080 190 - Mid-Tex Gas Division Addition 080.70599 37602 27,503 080 190 - Mid-Tex Gas Division Addition 080.70599 38000 4,854 080 190 - Mid-Tex Gas Division Addition 080.70602 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70602 38500 - 080 190 - Mid-Tex Gas Division Addition 080.70603 37602 183,703 080 190 - Mid-Tex Gas Division Addition 080.70605 37602 185,794 080 190 - Mid-Tex Gas Division Addition 080.70606 37602 15,022 080 190 - Mid-Tex Gas Division Addition 080.70606 38000 6,438 080 190 - Mid-Tex Gas Division Addition 080.70608 37602 9,759 080 190 - Mid-Tex Gas Division Addition 080.70610 37602 8,019 080 190 - Mid-Tex Gas Division Addition 080.70610 37800 2,005 080 190 - Mid-Tex Gas Division Addition 080.70611 37602 94,424 080 190 - Mid-Tex Gas Division Addition 080.70611 37800 94,424 080 190 - Mid-Tex Gas Division Addition 080.70612 37602 9,908 080 190 - Mid-Tex Gas Division Addition 080.70612 37800 1,524 080 190 - Mid-Tex Gas Division Addition 080.70612 38000 762 080 190 - Mid-Tex Gas Division Addition 080.70614 37602 4,952 080 190 - Mid-Tex Gas Division Addition 080.70614 37800 2,072 080 190 - Mid-Tex Gas Division Addition 080.70615 37602 4,719 080 190 - Mid-Tex Gas Division Addition 080.70615 37800 2,184 080 190 - Mid-Tex Gas Division Addition 080.70616 37602 2,797 080 190 - Mid-Tex Gas Division Addition 080.70616 37800 2,797 080 190 - Mid-Tex Gas Division Addition 080.70617 37602 8,957 080 190 - Mid-Tex Gas Division Addition 080.70617 37800 57 080 190 - Mid-Tex Gas Division Addition 080.70618 37602 84,833 080 190 - Mid-Tex Gas Division Addition 080.70618 37800 76,350 080 190 - Mid-Tex Gas Division Addition 080.70618 38000 8,483 080 190 - Mid-Tex Gas Division Addition 080.70619 37602 88,636 080 190 - Mid-Tex Gas Division Addition 080.70619 37800 40,909 080 190 - Mid-Tex Gas Division Addition 080.70619 38000 6,818 080 190 - Mid-Tex Gas Division Addition 080.70620 37602 127,164 080 190 - Mid-Tex Gas Division Addition 080.70620 37800 74,179 080 190 - Mid-Tex Gas Division Addition 080.70620 38000 10,597 080 190 - Mid-Tex Gas Division Addition 080.70625 38000 6,805 080 190 - Mid-Tex Gas Division Addition 080.70625 38500 6,538 080 190 - Mid-Tex Gas Division Addition 080.70630 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70633 37602 2,571 080 190 - Mid-Tex Gas Division Addition 080.70633 38000 286 080 190 - Mid-Tex Gas Division Addition 080.70636 37602 7,380 080 190 - Mid-Tex Gas Division Addition 080.70636 38000 821 080 190 - Mid-Tex Gas Division Addition 080.70638 37602 8,939 080 190 - Mid-Tex Gas Division Addition 080.70638 38000 2,980 080 190 - Mid-Tex Gas Division Addition 080.70639 37602 13,741 080 190 - Mid-Tex Gas Division Addition 080.70639 38000 3,435 080 190 - Mid-Tex Gas Division Addition 080.70643 37602 111,366 080 190 - Mid-Tex Gas Division Addition 080.70643 37800 91,117 080 190 - Mid-Tex Gas Division Addition 080.70644 37602 25,279 080 190 - Mid-Tex Gas Division Addition 080.70644 38000 2,809 080 190 - Mid-Tex Gas Division Addition 080.70650 37602 18,398 080 190 - Mid-Tex Gas Division Addition 080.70650 38000 3,246 080 190 - Mid-Tex Gas Division Addition 080.70655 37602 13,431 080 190 - Mid-Tex Gas Division Addition 080.70664 37602 508 080 190 - Mid-Tex Gas Division Addition 080.70678 37602 11,631 080 190 - Mid-Tex Gas Division Addition 080.70681 37602 242,142 080 190 - Mid-Tex Gas Division Addition 080.70683 37602 29,081 080 190 - Mid-Tex Gas Division Addition 080.70686 37602 719,017 080 190 - Mid-Tex Gas Division Addition 080.70686 38000 - 080 190 - Mid-Tex Gas Division Addition 080.70688 37602 180,119 080 190 - Mid-Tex Gas Division Addition 080.70691 38000 1,309 080 190 - Mid-Tex Gas Division Addition 080.70693 37602 9,652 080 190 - Mid-Tex Gas Division Addition 080.70693 38000 6,125 080 190 - Mid-Tex Gas Division Addition 080.70702 37602 25,261 080 190 - Mid-Tex Gas Division Addition 080.70702 38000 2,807 080 190 - Mid-Tex Gas Division Addition 080.70706 37602 3,300 080 190 - Mid-Tex Gas Division Addition 080.70706 37800 4,033 080 190 - Mid-Tex Gas Division Addition 080.70708 37602 2,285 080 190 - Mid-Tex Gas Division Addition 080.70711 37602 1,124 080 190 - Mid-Tex Gas Division Addition 080.70712 37601 2,568 080 190 - Mid-Tex Gas Division Addition 080.70712 37602 4,402 080 190 - Mid-Tex Gas Division Addition 080.70712 38000 367 080 190 - Mid-Tex Gas Division Addition 080.70722 37602 268 080 190 - Mid-Tex Gas Division Addition 080.70723 37602 3,364 080 190 - Mid-Tex Gas Division Addition 080.70725 37602 550 080 190 - Mid-Tex Gas Division Addition 080.70728 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70734 37601 449 080 190 - Mid-Tex Gas Division Addition 080.70734 37602 14,762 080 190 - Mid-Tex Gas Division Addition 080.70734 38000 7,224 080 190 - Mid-Tex Gas Division Addition 080.70735 37602 22,283 080 190 - Mid-Tex Gas Division Addition 080.70735 38000 3,383 080 190 - Mid-Tex Gas Division Addition 080.70739 37602 13,460 080 190 - Mid-Tex Gas Division Addition 080.70739 38000 831 080 190 - Mid-Tex Gas Division Addition 080.70741 37602 2,393 080 190 - Mid-Tex Gas Division Addition 080.70742 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70744 37602 1,228 080 190 - Mid-Tex Gas Division Addition 080.70746 37602 31,816 080 190 - Mid-Tex Gas Division Addition 080.70746 38000 13,635 080 190 - Mid-Tex Gas Division Addition 080.70750 37602 22,730 080 190 - Mid-Tex Gas Division Addition 080.70768 37602 363 080 190 - Mid-Tex Gas Division Addition 080.70787 37602 4,041 080 190 - Mid-Tex Gas Division Addition 080.70790 37602 561 080 190 - Mid-Tex Gas Division Addition 080.70796 37602 - MTX Additions by FERC Page 58 of 101 456 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.70797 37800 5,865 080 190 - Mid-Tex Gas Division Addition 080.70798 37602 1,208 080 190 - Mid-Tex Gas Division Addition 080.70798 37900 2,621 080 190 - Mid-Tex Gas Division Addition 080.70799 37602 5 080 190 - Mid-Tex Gas Division Addition 080.70806 37602 11,805 080 190 - Mid-Tex Gas Division Addition 080.70809 37602 3,304 080 190 - Mid-Tex Gas Division Addition 080.70810 37602 20,802 080 190 - Mid-Tex Gas Division Addition 080.70810 38000 2,311 080 190 - Mid-Tex Gas Division Addition 080.70816 37602 3,519 080 190 - Mid-Tex Gas Division Addition 080.70816 38000 185 080 190 - Mid-Tex Gas Division Addition 080.70817 37602 4 080 190 - Mid-Tex Gas Division Addition 080.70822 37601 95,266 080 190 - Mid-Tex Gas Division Addition 080.70824 37602 5,786 080 190 - Mid-Tex Gas Division Addition 080.70824 38000 58 080 190 - Mid-Tex Gas Division Addition 080.70826 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70831 37600 3,604 080 190 - Mid-Tex Gas Division Addition 080.70831 37601 10,813 080 190 - Mid-Tex Gas Division Addition 080.70835 37602 26,390 080 190 - Mid-Tex Gas Division Addition 080.70835 38000 6,597 080 190 - Mid-Tex Gas Division Addition 080.70837 37602 9,266 080 190 - Mid-Tex Gas Division Addition 080.70840 37602 28,487 080 190 - Mid-Tex Gas Division Addition 080.70840 38000 5,027 080 190 - Mid-Tex Gas Division Addition 080.70842 37602 7,584 080 190 - Mid-Tex Gas Division Addition 080.70842 38000 1,338 080 190 - Mid-Tex Gas Division Addition 080.70843 37602 11,348 080 190 - Mid-Tex Gas Division Addition 080.70843 38000 596 080 190 - Mid-Tex Gas Division Addition 080.70848 37602 (92) 080 190 - Mid-Tex Gas Division Addition 080.70849 37601 7,867 080 190 - Mid-Tex Gas Division Addition 080.70850 37602 156 080 190 - Mid-Tex Gas Division Addition 080.70855 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70855 38000 - 080 190 - Mid-Tex Gas Division Addition 080.70857 37602 23,496 080 190 - Mid-Tex Gas Division Addition 080.70857 38000 3,511 080 190 - Mid-Tex Gas Division Addition 080.70859 37602 5,016 080 190 - Mid-Tex Gas Division Addition 080.70865 39906 - 080 190 - Mid-Tex Gas Division Addition 080.70867 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70868 37602 7,883 080 190 - Mid-Tex Gas Division Addition 080.70871 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70873 37602 5,558 080 190 - Mid-Tex Gas Division Addition 080.70873 38000 1,390 080 190 - Mid-Tex Gas Division Addition 080.70875 37602 5,527 080 190 - Mid-Tex Gas Division Addition 080.70875 38000 614 080 190 - Mid-Tex Gas Division Addition 080.70876 37602 71,294 080 190 - Mid-Tex Gas Division Addition 080.70884 38300 7,575 080 190 - Mid-Tex Gas Division Addition 080.70892 37602 3,457 080 190 - Mid-Tex Gas Division Addition 080.70894 37600 231 080 190 - Mid-Tex Gas Division Addition 080.70894 37601 22,839 080 190 - Mid-Tex Gas Division Addition 080.70897 37601 4,037 080 190 - Mid-Tex Gas Division Addition 080.70897 37602 22,879 080 190 - Mid-Tex Gas Division Addition 080.70899 37602 20,128 080 190 - Mid-Tex Gas Division Addition 080.70899 38000 6,444 080 190 - Mid-Tex Gas Division Addition 080.70903 37602 2,706 080 190 - Mid-Tex Gas Division Addition 080.70903 37800 5,413 080 190 - Mid-Tex Gas Division Addition 080.70907 37602 857 080 190 - Mid-Tex Gas Division Addition 080.70914 37602 340,979 080 190 - Mid-Tex Gas Division Addition 080.70923 37602 5,022 080 190 - Mid-Tex Gas Division Addition 080.70923 37800 5,692 080 190 - Mid-Tex Gas Division Addition 080.70926 37602 2,944 080 190 - Mid-Tex Gas Division Addition 080.70926 37800 2,031 080 190 - Mid-Tex Gas Division Addition 080.70927 37602 69,785 080 190 - Mid-Tex Gas Division Addition 080.70927 38000 17,446 080 190 - Mid-Tex Gas Division Addition 080.70935 37601 65,754 080 190 - Mid-Tex Gas Division Addition 080.70936 37601 108 080 190 - Mid-Tex Gas Division Addition 080.70936 37602 8,079 080 190 - Mid-Tex Gas Division Addition 080.70936 37800 2,358 080 190 - Mid-Tex Gas Division Addition 080.70936 38000 734 080 190 - Mid-Tex Gas Division Addition 080.70938 37601 329,113 080 190 - Mid-Tex Gas Division Addition 080.70938 37800 8,773 080 190 - Mid-Tex Gas Division Addition 080.70949 37602 18,703 080 190 - Mid-Tex Gas Division Addition 080.70952 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70954 37601 - 080 190 - Mid-Tex Gas Division Addition 080.70954 38500 - 080 190 - Mid-Tex Gas Division Addition 080.70958 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70962 37602 25,774 080 190 - Mid-Tex Gas Division Addition 080.70965 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70968 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70979 37602 30,997 080 190 - Mid-Tex Gas Division Addition 080.70981 37602 3 080 190 - Mid-Tex Gas Division Addition 080.70984 37602 24,638 080 190 - Mid-Tex Gas Division Addition 080.70984 38000 762 080 190 - Mid-Tex Gas Division Addition 080.70985 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70990 37602 - 080 190 - Mid-Tex Gas Division Addition 080.70996 37602 229,880 080 190 - Mid-Tex Gas Division Addition 080.70998 37602 22,728 080 190 - Mid-Tex Gas Division Addition 080.70998 38000 230 080 190 - Mid-Tex Gas Division Addition 080.70999 37602 14,245 080 190 - Mid-Tex Gas Division Addition 080.71000 37602 9,453 080 190 - Mid-Tex Gas Division Addition 080.71000 38000 2,363 080 190 - Mid-Tex Gas Division Addition 080.71001 37602 607 080 190 - Mid-Tex Gas Division Addition 080.71011 37602 47,145 080 190 - Mid-Tex Gas Division Addition 080.71011 38000 5,238 080 190 - Mid-Tex Gas Division Addition 080.71014 37800 4,485 080 190 - Mid-Tex Gas Division Addition 080.71015 37602 7,289 080 190 - Mid-Tex Gas Division Addition 080.71018 37602 37,851 080 190 - Mid-Tex Gas Division Addition 080.71018 38000 7,210 080 190 - Mid-Tex Gas Division Addition 080.71019 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71021 37602 7,113 080 190 - Mid-Tex Gas Division Addition 080.71021 38000 790 080 190 - Mid-Tex Gas Division Addition 080.71028 37602 4,498 080 190 - Mid-Tex Gas Division Addition 080.71028 38000 1,124 080 190 - Mid-Tex Gas Division Addition 080.71030 37800 13,568 080 190 - Mid-Tex Gas Division Addition 080.71031 37602 151,072 080 190 - Mid-Tex Gas Division Addition 080.71031 38000 26,660 080 190 - Mid-Tex Gas Division Addition 080.71033 37602 4,163 080 190 - Mid-Tex Gas Division Addition 080.71035 37602 9,965 080 190 - Mid-Tex Gas Division Addition 080.71036 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71039 37602 55,245 MTX Additions by FERC Page 59 of 101 457 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.71043 37601 693,900 080 190 - Mid-Tex Gas Division Addition 080.71043 37800 77,100 080 190 - Mid-Tex Gas Division Addition 080.71044 38000 7,056 080 190 - Mid-Tex Gas Division Addition 080.71045 38000 14,378 080 190 - Mid-Tex Gas Division Addition 080.71045 38500 4,793 080 190 - Mid-Tex Gas Division Addition 080.71046 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71050 37602 1,788 080 190 - Mid-Tex Gas Division Addition 080.71066 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71070 37602 1,589 080 190 - Mid-Tex Gas Division Addition 080.71079 37602 6,379 080 190 - Mid-Tex Gas Division Addition 080.71081 37602 3,312 080 190 - Mid-Tex Gas Division Addition 080.71081 38000 828 080 190 - Mid-Tex Gas Division Addition 080.71082 37602 22,865 080 190 - Mid-Tex Gas Division Addition 080.71082 38000 2,540 080 190 - Mid-Tex Gas Division Addition 080.71084 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71085 37602 (6,460) 080 190 - Mid-Tex Gas Division Addition 080.71085 38500 (1,140) 080 190 - Mid-Tex Gas Division Addition 080.71090 37601 175 080 190 - Mid-Tex Gas Division Addition 080.71090 37602 3,326 080 190 - Mid-Tex Gas Division Addition 080.71091 37602 20,578 080 190 - Mid-Tex Gas Division Addition 080.71091 38000 1,083 080 190 - Mid-Tex Gas Division Addition 080.71092 37602 412 080 190 - Mid-Tex Gas Division Addition 080.71094 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71095 37602 (140) 080 190 - Mid-Tex Gas Division Addition 080.71098 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71099 37602 13,154 080 190 - Mid-Tex Gas Division Addition 080.71099 38000 692 080 190 - Mid-Tex Gas Division Addition 080.71100 37601 (42,989) 080 190 - Mid-Tex Gas Division Addition 080.71100 37800 (43,293) 080 190 - Mid-Tex Gas Division Addition 080.71102 37602 4,418 080 190 - Mid-Tex Gas Division Addition 080.71105 37602 2,916 080 190 - Mid-Tex Gas Division Addition 080.71105 38000 324 080 190 - Mid-Tex Gas Division Addition 080.71107 37602 7,950 080 190 - Mid-Tex Gas Division Addition 080.71109 37602 32,517 080 190 - Mid-Tex Gas Division Addition 080.71109 38000 4,434 080 190 - Mid-Tex Gas Division Addition 080.71114 37602 1,372 080 190 - Mid-Tex Gas Division Addition 080.71116 37602 13,990 080 190 - Mid-Tex Gas Division Addition 080.71119 37602 20,146 080 190 - Mid-Tex Gas Division Addition 080.71119 38000 623 080 190 - Mid-Tex Gas Division Addition 080.71121 37602 4,555 080 190 - Mid-Tex Gas Division Addition 080.71124 37602 6,118 080 190 - Mid-Tex Gas Division Addition 080.71124 38000 680 080 190 - Mid-Tex Gas Division Addition 080.71126 37602 87,414 080 190 - Mid-Tex Gas Division Addition 080.71128 37602 267 080 190 - Mid-Tex Gas Division Addition 080.71129 37602 (221,723) 080 190 - Mid-Tex Gas Division Addition 080.71129 38000 (24,636) 080 190 - Mid-Tex Gas Division Addition 080.71130 37602 63,532 080 190 - Mid-Tex Gas Division Addition 080.71134 37602 12,924 080 190 - Mid-Tex Gas Division Addition 080.71134 38000 5,539 080 190 - Mid-Tex Gas Division Addition 080.71143 37602 7,747 080 190 - Mid-Tex Gas Division Addition 080.71143 38000 7,151 080 190 - Mid-Tex Gas Division Addition 080.71145 37602 7,360 080 190 - Mid-Tex Gas Division Addition 080.71148 37602 18,111 080 190 - Mid-Tex Gas Division Addition 080.71148 38000 1,363 080 190 - Mid-Tex Gas Division Addition 080.71150 37602 3,601 080 190 - Mid-Tex Gas Division Addition 080.71155 37602 24,219 080 190 - Mid-Tex Gas Division Addition 080.71155 38000 11,788 080 190 - Mid-Tex Gas Division Addition 080.71163 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71165 37602 13,377 080 190 - Mid-Tex Gas Division Addition 080.71165 38000 4,459 080 190 - Mid-Tex Gas Division Addition 080.71168 37602 (31,492) 080 190 - Mid-Tex Gas Division Addition 080.71170 37602 2,781 080 190 - Mid-Tex Gas Division Addition 080.71170 38000 4,171 080 190 - Mid-Tex Gas Division Addition 080.71172 37602 507 080 190 - Mid-Tex Gas Division Addition 080.71173 37602 17,141 080 190 - Mid-Tex Gas Division Addition 080.71173 38000 7,346 080 190 - Mid-Tex Gas Division Addition 080.71174 37602 (13,814) 080 190 - Mid-Tex Gas Division Addition 080.71177 37602 1,633,207 080 190 - Mid-Tex Gas Division Addition 080.71177 38000 244,042 080 190 - Mid-Tex Gas Division Addition 080.71185 37602 7,789 080 190 - Mid-Tex Gas Division Addition 080.71185 38000 410 080 190 - Mid-Tex Gas Division Addition 080.71189 37602 8,395 080 190 - Mid-Tex Gas Division Addition 080.71192 37602 9,277 080 190 - Mid-Tex Gas Division Addition 080.71192 38000 2,319 080 190 - Mid-Tex Gas Division Addition 080.71211 37602 66,434 080 190 - Mid-Tex Gas Division Addition 080.71214 37602 10,250 080 190 - Mid-Tex Gas Division Addition 080.71214 38000 1,139 080 190 - Mid-Tex Gas Division Addition 080.71222 37602 54,442 080 190 - Mid-Tex Gas Division Addition 080.71223 37602 5,106 080 190 - Mid-Tex Gas Division Addition 080.71224 37602 41,518 080 190 - Mid-Tex Gas Division Addition 080.71224 38000 1,284 080 190 - Mid-Tex Gas Division Addition 080.71235 37602 305,643 080 190 - Mid-Tex Gas Division Addition 080.71236 37602 1,047,387 080 190 - Mid-Tex Gas Division Addition 080.71237 37602 484 080 190 - Mid-Tex Gas Division Addition 080.71238 37602 49 080 190 - Mid-Tex Gas Division Addition 080.71239 37602 8,109 080 190 - Mid-Tex Gas Division Addition 080.71240 37602 507 080 190 - Mid-Tex Gas Division Addition 080.71247 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71250 37602 15,980 080 190 - Mid-Tex Gas Division Addition 080.71251 37602 177,189 080 190 - Mid-Tex Gas Division Addition 080.71254 37602 13,150 080 190 - Mid-Tex Gas Division Addition 080.71255 37601 178,373 080 190 - Mid-Tex Gas Division Addition 080.71263 37602 6,998 080 190 - Mid-Tex Gas Division Addition 080.71267 37602 5,265 080 190 - Mid-Tex Gas Division Addition 080.71271 37602 30,324 080 190 - Mid-Tex Gas Division Addition 080.71274 37602 12,761 080 190 - Mid-Tex Gas Division Addition 080.71274 38000 4,254 080 190 - Mid-Tex Gas Division Addition 080.71276 37601 111,718 080 190 - Mid-Tex Gas Division Addition 080.71278 37602 20,348 080 190 - Mid-Tex Gas Division Addition 080.71278 38000 2,261 080 190 - Mid-Tex Gas Division Addition 080.71284 37602 26,424 080 190 - Mid-Tex Gas Division Addition 080.71284 38000 (20,881) 080 190 - Mid-Tex Gas Division Addition 080.71285 37602 3,839 080 190 - Mid-Tex Gas Division Addition 080.71285 37800 8,956 080 190 - Mid-Tex Gas Division Addition 080.71294 37602 15,782 080 190 - Mid-Tex Gas Division Addition 080.71294 38000 5,261 080 190 - Mid-Tex Gas Division Addition 080.71302 37602 7,499 MTX Additions by FERC Page 60 of 101 458 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.71302 38000 395 080 190 - Mid-Tex Gas Division Addition 080.71303 37602 10,762 080 190 - Mid-Tex Gas Division Addition 080.71303 38000 566 080 190 - Mid-Tex Gas Division Addition 080.71304 37602 3,507,303 080 190 - Mid-Tex Gas Division Addition 080.71304 38000 263,991 080 190 - Mid-Tex Gas Division Addition 080.71305 37602 4,223 080 190 - Mid-Tex Gas Division Addition 080.71313 38000 (5,306) 080 190 - Mid-Tex Gas Division Addition 080.71314 37602 988 080 190 - Mid-Tex Gas Division Addition 080.71321 37602 14,319 080 190 - Mid-Tex Gas Division Addition 080.71321 38000 1,591 080 190 - Mid-Tex Gas Division Addition 080.71322 38000 86,423 080 190 - Mid-Tex Gas Division Addition 080.71323 38000 61,876 080 190 - Mid-Tex Gas Division Addition 080.71324 38000 45,574 080 190 - Mid-Tex Gas Division Addition 080.71325 37602 1,045 080 190 - Mid-Tex Gas Division Addition 080.71329 37601 6,098 080 190 - Mid-Tex Gas Division Addition 080.71329 37602 5,807 080 190 - Mid-Tex Gas Division Addition 080.71329 37800 1,161 080 190 - Mid-Tex Gas Division Addition 080.71332 37602 10,652 080 190 - Mid-Tex Gas Division Addition 080.71332 38000 42,610 080 190 - Mid-Tex Gas Division Addition 080.71333 38000 37,877 080 190 - Mid-Tex Gas Division Addition 080.71336 38000 67,498 080 190 - Mid-Tex Gas Division Addition 080.71337 37602 8,322 080 190 - Mid-Tex Gas Division Addition 080.71342 37602 4,637 080 190 - Mid-Tex Gas Division Addition 080.71343 37602 2,427 080 190 - Mid-Tex Gas Division Addition 080.71343 38000 74 080 190 - Mid-Tex Gas Division Addition 080.71344 37601 5,992 080 190 - Mid-Tex Gas Division Addition 080.71344 37602 2,568 080 190 - Mid-Tex Gas Division Addition 080.71344 37800 856 080 190 - Mid-Tex Gas Division Addition 080.71346 37601 2,243 080 190 - Mid-Tex Gas Division Addition 080.71346 37602 4,486 080 190 - Mid-Tex Gas Division Addition 080.71346 37800 2,243 080 190 - Mid-Tex Gas Division Addition 080.71348 37602 2,224 080 190 - Mid-Tex Gas Division Addition 080.71348 37800 1,846 080 190 - Mid-Tex Gas Division Addition 080.71349 37602 6,191 080 190 - Mid-Tex Gas Division Addition 080.71350 37602 1,692 080 190 - Mid-Tex Gas Division Addition 080.71350 37800 3,385 080 190 - Mid-Tex Gas Division Addition 080.71351 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71352 37800 6,546 080 190 - Mid-Tex Gas Division Addition 080.71353 37602 88,032 080 190 - Mid-Tex Gas Division Addition 080.71359 37602 3,864 080 190 - Mid-Tex Gas Division Addition 080.71359 37800 5,313 080 190 - Mid-Tex Gas Division Addition 080.71359 38000 483 080 190 - Mid-Tex Gas Division Addition 080.71365 37602 8,514 080 190 - Mid-Tex Gas Division Addition 080.71367 37602 10,863 080 190 - Mid-Tex Gas Division Addition 080.71367 38000 1,917 080 190 - Mid-Tex Gas Division Addition 080.71368 37602 9,653 080 190 - Mid-Tex Gas Division Addition 080.71368 38000 1,704 080 190 - Mid-Tex Gas Division Addition 080.71369 37602 17,877 080 190 - Mid-Tex Gas Division Addition 080.71369 38000 3,155 080 190 - Mid-Tex Gas Division Addition 080.71380 37602 31,752 080 190 - Mid-Tex Gas Division Addition 080.71381 37602 206 080 190 - Mid-Tex Gas Division Addition 080.71386 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71387 37602 403,127 080 190 - Mid-Tex Gas Division Addition 080.71387 38000 71,140 080 190 - Mid-Tex Gas Division Addition 080.71388 37601 25,730 080 190 - Mid-Tex Gas Division Addition 080.71389 37602 1,513 080 190 - Mid-Tex Gas Division Addition 080.71389 37800 2,118 080 190 - Mid-Tex Gas Division Addition 080.71390 37602 4 080 190 - Mid-Tex Gas Division Addition 080.71391 37602 8,328 080 190 - Mid-Tex Gas Division Addition 080.71391 38000 438 080 190 - Mid-Tex Gas Division Addition 080.71393 37602 3,447 080 190 - Mid-Tex Gas Division Addition 080.71395 37602 6,680 080 190 - Mid-Tex Gas Division Addition 080.71395 38000 6,680 080 190 - Mid-Tex Gas Division Addition 080.71397 37602 11,123 080 190 - Mid-Tex Gas Division Addition 080.71397 38000 2,781 080 190 - Mid-Tex Gas Division Addition 080.71401 37602 641 080 190 - Mid-Tex Gas Division Addition 080.71403 37602 2,688 080 190 - Mid-Tex Gas Division Addition 080.71403 37800 3,046 080 190 - Mid-Tex Gas Division Addition 080.71404 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71408 37602 21,284 080 190 - Mid-Tex Gas Division Addition 080.71408 38000 7,094 080 190 - Mid-Tex Gas Division Addition 080.71409 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71412 37602 314,377 080 190 - Mid-Tex Gas Division Addition 080.71412 38000 34,931 080 190 - Mid-Tex Gas Division Addition 080.71416 37602 46,916 080 190 - Mid-Tex Gas Division Addition 080.71416 38000 2,469 080 190 - Mid-Tex Gas Division Addition 080.71417 37602 1,991 080 190 - Mid-Tex Gas Division Addition 080.71417 37800 2,472 080 190 - Mid-Tex Gas Division Addition 080.71420 38000 1,807 080 190 - Mid-Tex Gas Division Addition 080.71423 37602 8,630 080 190 - Mid-Tex Gas Division Addition 080.71423 38000 454 080 190 - Mid-Tex Gas Division Addition 080.71425 37602 10,175 080 190 - Mid-Tex Gas Division Addition 080.71425 38000 536 080 190 - Mid-Tex Gas Division Addition 080.71426 37602 2,107 080 190 - Mid-Tex Gas Division Addition 080.71426 37800 2,388 080 190 - Mid-Tex Gas Division Addition 080.71427 37602 10,138 080 190 - Mid-Tex Gas Division Addition 080.71427 38000 2,535 080 190 - Mid-Tex Gas Division Addition 080.71429 37601 - 080 190 - Mid-Tex Gas Division Addition 080.71429 37602 374,471 080 190 - Mid-Tex Gas Division Addition 080.71429 38000 - 080 190 - Mid-Tex Gas Division Addition 080.71431 37800 2,745 080 190 - Mid-Tex Gas Division Addition 080.71436 37602 933 080 190 - Mid-Tex Gas Division Addition 080.71438 37602 17,009 080 190 - Mid-Tex Gas Division Addition 080.71438 38000 1,890 080 190 - Mid-Tex Gas Division Addition 080.71441 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71442 37602 36,128 080 190 - Mid-Tex Gas Division Addition 080.71442 38000 6,376 080 190 - Mid-Tex Gas Division Addition 080.71443 37602 6,388 080 190 - Mid-Tex Gas Division Addition 080.71445 37800 1,287 080 190 - Mid-Tex Gas Division Addition 080.71449 37602 3,959 080 190 - Mid-Tex Gas Division Addition 080.71449 38000 1,320 080 190 - Mid-Tex Gas Division Addition 080.71460 37602 358,625 080 190 - Mid-Tex Gas Division Addition 080.71462 37602 133,391 080 190 - Mid-Tex Gas Division Addition 080.71463 37602 200,060 080 190 - Mid-Tex Gas Division Addition 080.71464 37602 119,430 080 190 - Mid-Tex Gas Division Addition 080.71467 37602 208,498 080 190 - Mid-Tex Gas Division Addition 080.71467 37800 6,950 MTX Additions by FERC Page 61 of 101 459 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.71467 38000 132,049 080 190 - Mid-Tex Gas Division Addition 080.71471 37602 3,100 080 190 - Mid-Tex Gas Division Addition 080.71471 37800 3,100 080 190 - Mid-Tex Gas Division Addition 080.71472 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71476 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71478 37602 3 080 190 - Mid-Tex Gas Division Addition 080.71479 37602 28,704 080 190 - Mid-Tex Gas Division Addition 080.71484 37601 2,926 080 190 - Mid-Tex Gas Division Addition 080.71484 37602 1,463 080 190 - Mid-Tex Gas Division Addition 080.71484 37800 2,195 080 190 - Mid-Tex Gas Division Addition 080.71485 37600 18,197 080 190 - Mid-Tex Gas Division Addition 080.71486 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71489 37602 3,067 080 190 - Mid-Tex Gas Division Addition 080.71489 37800 3,067 080 190 - Mid-Tex Gas Division Addition 080.71494 37601 276 080 190 - Mid-Tex Gas Division Addition 080.71494 37602 551 080 190 - Mid-Tex Gas Division Addition 080.71494 37800 2,206 080 190 - Mid-Tex Gas Division Addition 080.71496 37601 47,133 080 190 - Mid-Tex Gas Division Addition 080.71499 37602 2,031 080 190 - Mid-Tex Gas Division Addition 080.71499 37800 2,709 080 190 - Mid-Tex Gas Division Addition 080.71509 39906 - 080 190 - Mid-Tex Gas Division Addition 080.71514 37602 17,533 080 190 - Mid-Tex Gas Division Addition 080.71514 38000 731 080 190 - Mid-Tex Gas Division Addition 080.71516 37601 785 080 190 - Mid-Tex Gas Division Addition 080.71516 37602 1,571 080 190 - Mid-Tex Gas Division Addition 080.71516 37800 1,812 080 190 - Mid-Tex Gas Division Addition 080.71517 37602 27,809 080 190 - Mid-Tex Gas Division Addition 080.71517 38000 1,464 080 190 - Mid-Tex Gas Division Addition 080.71518 37602 180,496 080 190 - Mid-Tex Gas Division Addition 080.71519 37602 153,596 080 190 - Mid-Tex Gas Division Addition 080.71521 37602 249,643 080 190 - Mid-Tex Gas Division Addition 080.71522 37602 117,775 080 190 - Mid-Tex Gas Division Addition 080.71522 37800 232,169 080 190 - Mid-Tex Gas Division Addition 080.71523 37601 838 080 190 - Mid-Tex Gas Division Addition 080.71523 37602 2,514 080 190 - Mid-Tex Gas Division Addition 080.71523 37800 3,247 080 190 - Mid-Tex Gas Division Addition 080.71527 37602 801 080 190 - Mid-Tex Gas Division Addition 080.71528 37602 19,872 080 190 - Mid-Tex Gas Division Addition 080.71528 38000 4,968 080 190 - Mid-Tex Gas Division Addition 080.71529 37602 2,012 080 190 - Mid-Tex Gas Division Addition 080.71529 37800 2,952 080 190 - Mid-Tex Gas Division Addition 080.71530 37602 3,720 080 190 - Mid-Tex Gas Division Addition 080.71531 37602 1,172 080 190 - Mid-Tex Gas Division Addition 080.71531 37800 3,515 080 190 - Mid-Tex Gas Division Addition 080.71534 37602 46,529 080 190 - Mid-Tex Gas Division Addition 080.71534 38000 5,751 080 190 - Mid-Tex Gas Division Addition 080.71539 37601 313,883 080 190 - Mid-Tex Gas Division Addition 080.71540 37800 35,762 080 190 - Mid-Tex Gas Division Addition 080.71547 37602 1,446 080 190 - Mid-Tex Gas Division Addition 080.71553 37602 14 080 190 - Mid-Tex Gas Division Addition 080.71554 37602 (11) 080 190 - Mid-Tex Gas Division Addition 080.71554 38000 (4) 080 190 - Mid-Tex Gas Division Addition 080.71555 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71556 37602 3,283 080 190 - Mid-Tex Gas Division Addition 080.71557 37602 80 080 190 - Mid-Tex Gas Division Addition 080.71560 37602 289,348 080 190 - Mid-Tex Gas Division Addition 080.71561 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71563 37602 6,598 080 190 - Mid-Tex Gas Division Addition 080.71564 37602 (412) 080 190 - Mid-Tex Gas Division Addition 080.71567 37602 70,342 080 190 - Mid-Tex Gas Division Addition 080.71570 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71571 37602 416 080 190 - Mid-Tex Gas Division Addition 080.71578 39000 4,709 080 190 - Mid-Tex Gas Division Addition 080.71578 39800 4,272 080 190 - Mid-Tex Gas Division Addition 080.71578 39903 1,244 080 190 - Mid-Tex Gas Division Addition 080.71579 37800 8,542 080 190 - Mid-Tex Gas Division Addition 080.71581 37602 841 080 190 - Mid-Tex Gas Division Addition 080.71584 37600 4,960 080 190 - Mid-Tex Gas Division Addition 080.71584 37602 14,879 080 190 - Mid-Tex Gas Division Addition 080.71585 37602 961 080 190 - Mid-Tex Gas Division Addition 080.71588 37602 366 080 190 - Mid-Tex Gas Division Addition 080.71589 37602 4,588 080 190 - Mid-Tex Gas Division Addition 080.71589 37800 139 080 190 - Mid-Tex Gas Division Addition 080.71591 37602 3,790 080 190 - Mid-Tex Gas Division Addition 080.71591 38000 200 080 190 - Mid-Tex Gas Division Addition 080.71592 37602 25,568 080 190 - Mid-Tex Gas Division Addition 080.71592 38000 258 080 190 - Mid-Tex Gas Division Addition 080.71593 37602 9,139 080 190 - Mid-Tex Gas Division Addition 080.71594 37602 239 080 190 - Mid-Tex Gas Division Addition 080.71600 37602 281,014 080 190 - Mid-Tex Gas Division Addition 080.71601 37602 4,507 080 190 - Mid-Tex Gas Division Addition 080.71601 38000 237 080 190 - Mid-Tex Gas Division Addition 080.71607 37602 25,326 080 190 - Mid-Tex Gas Division Addition 080.71607 38000 3,784 080 190 - Mid-Tex Gas Division Addition 080.71611 37602 160 080 190 - Mid-Tex Gas Division Addition 080.71620 37602 119,997 080 190 - Mid-Tex Gas Division Addition 080.71622 37602 12,116 080 190 - Mid-Tex Gas Division Addition 080.71622 38000 1,346 080 190 - Mid-Tex Gas Division Addition 080.71627 37800 - 080 190 - Mid-Tex Gas Division Addition 080.71627 38000 56 080 190 - Mid-Tex Gas Division Addition 080.71627 38500 3,083 080 190 - Mid-Tex Gas Division Addition 080.71632 37602 11,653 080 190 - Mid-Tex Gas Division Addition 080.71634 37602 10,032 080 190 - Mid-Tex Gas Division Addition 080.71634 38000 2,508 080 190 - Mid-Tex Gas Division Addition 080.71635 37602 8,790 080 190 - Mid-Tex Gas Division Addition 080.71636 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71639 37602 427 080 190 - Mid-Tex Gas Division Addition 080.71643 37602 89 080 190 - Mid-Tex Gas Division Addition 080.71647 37602 12,056 080 190 - Mid-Tex Gas Division Addition 080.71647 38000 8,038 080 190 - Mid-Tex Gas Division Addition 080.71648 37602 25,138 080 190 - Mid-Tex Gas Division Addition 080.71648 38000 10,773 080 190 - Mid-Tex Gas Division Addition 080.71649 37602 1 080 190 - Mid-Tex Gas Division Addition 080.71654 37602 5,265 080 190 - Mid-Tex Gas Division Addition 080.71654 37800 6,435 080 190 - Mid-Tex Gas Division Addition 080.71658 37602 (27) 080 190 - Mid-Tex Gas Division Addition 080.71659 37602 1 MTX Additions by FERC Page 62 of 101 460 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.71664 37602 13,268 080 190 - Mid-Tex Gas Division Addition 080.71664 38000 4,423 080 190 - Mid-Tex Gas Division Addition 080.71665 37402 - 080 190 - Mid-Tex Gas Division Addition 080.71665 37602 221,799 080 190 - Mid-Tex Gas Division Addition 080.71672 39906 - 080 190 - Mid-Tex Gas Division Addition 080.71673 37601 (8) 080 190 - Mid-Tex Gas Division Addition 080.71674 37602 254 080 190 - Mid-Tex Gas Division Addition 080.71679 37602 5,823 080 190 - Mid-Tex Gas Division Addition 080.71680 37602 284 080 190 - Mid-Tex Gas Division Addition 080.71684 37602 8,684 080 190 - Mid-Tex Gas Division Addition 080.71684 38000 457 080 190 - Mid-Tex Gas Division Addition 080.71685 37602 9,363 080 190 - Mid-Tex Gas Division Addition 080.71687 37602 284,928 080 190 - Mid-Tex Gas Division Addition 080.71687 37800 (85,719) 080 190 - Mid-Tex Gas Division Addition 080.71688 37602 2,129 080 190 - Mid-Tex Gas Division Addition 080.71688 37800 2,129 080 190 - Mid-Tex Gas Division Addition 080.71695 37602 288 080 190 - Mid-Tex Gas Division Addition 080.71700 37602 34,572 080 190 - Mid-Tex Gas Division Addition 080.71701 37602 13,119 080 190 - Mid-Tex Gas Division Addition 080.71702 37602 19,237 080 190 - Mid-Tex Gas Division Addition 080.71703 37602 272,398 080 190 - Mid-Tex Gas Division Addition 080.71704 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71709 37602 2 080 190 - Mid-Tex Gas Division Addition 080.71710 37602 45,246 080 190 - Mid-Tex Gas Division Addition 080.71710 38000 5,027 080 190 - Mid-Tex Gas Division Addition 080.71711 37602 582 080 190 - Mid-Tex Gas Division Addition 080.71716 37602 1,225,058 080 190 - Mid-Tex Gas Division Addition 080.71716 38000 345,529 080 190 - Mid-Tex Gas Division Addition 080.71717 37602 12,616 080 190 - Mid-Tex Gas Division Addition 080.71719 38000 52,459 080 190 - Mid-Tex Gas Division Addition 080.71728 37800 3,115 080 190 - Mid-Tex Gas Division Addition 080.71733 37602 951 080 190 - Mid-Tex Gas Division Addition 080.71736 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71737 37602 25,901 080 190 - Mid-Tex Gas Division Addition 080.71738 37602 41,286 080 190 - Mid-Tex Gas Division Addition 080.71738 38000 10,322 080 190 - Mid-Tex Gas Division Addition 080.71744 37602 374 080 190 - Mid-Tex Gas Division Addition 080.71747 37602 2,856 080 190 - Mid-Tex Gas Division Addition 080.71755 37601 (888,716) 080 190 - Mid-Tex Gas Division Addition 080.71755 37602 (1,086,209) 080 190 - Mid-Tex Gas Division Addition 080.71758 37602 216,980 080 190 - Mid-Tex Gas Division Addition 080.71759 37602 5,797 080 190 - Mid-Tex Gas Division Addition 080.71760 37602 44,909 080 190 - Mid-Tex Gas Division Addition 080.71760 38000 9,438 080 190 - Mid-Tex Gas Division Addition 080.71761 37602 25,179 080 190 - Mid-Tex Gas Division Addition 080.71762 37602 12,897 080 190 - Mid-Tex Gas Division Addition 080.71762 38000 3,224 080 190 - Mid-Tex Gas Division Addition 080.71763 37602 451,854 080 190 - Mid-Tex Gas Division Addition 080.71768 37601 17,814 080 190 - Mid-Tex Gas Division Addition 080.71773 37602 657,655 080 190 - Mid-Tex Gas Division Addition 080.71773 38000 144,363 080 190 - Mid-Tex Gas Division Addition 080.71775 37602 815,004 080 190 - Mid-Tex Gas Division Addition 080.71779 37602 471,040 080 190 - Mid-Tex Gas Division Addition 080.71786 37602 67,591 080 190 - Mid-Tex Gas Division Addition 080.71787 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71792 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71797 37602 (34) 080 190 - Mid-Tex Gas Division Addition 080.71800 37602 568 080 190 - Mid-Tex Gas Division Addition 080.71801 37602 267 080 190 - Mid-Tex Gas Division Addition 080.71804 37602 (131) 080 190 - Mid-Tex Gas Division Addition 080.71805 37602 333,332 080 190 - Mid-Tex Gas Division Addition 080.71805 38000 37,037 080 190 - Mid-Tex Gas Division Addition 080.71807 37602 320 080 190 - Mid-Tex Gas Division Addition 080.71809 37601 436 080 190 - Mid-Tex Gas Division Addition 080.71809 37602 1,745 080 190 - Mid-Tex Gas Division Addition 080.71810 37602 (58) 080 190 - Mid-Tex Gas Division Addition 080.71811 37602 19,598 080 190 - Mid-Tex Gas Division Addition 080.71817 37602 16,113 080 190 - Mid-Tex Gas Division Addition 080.71817 38000 848 080 190 - Mid-Tex Gas Division Addition 080.71819 37602 783 080 190 - Mid-Tex Gas Division Addition 080.71823 37602 7,749 080 190 - Mid-Tex Gas Division Addition 080.71823 38000 408 080 190 - Mid-Tex Gas Division Addition 080.71824 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71830 37601 365 080 190 - Mid-Tex Gas Division Addition 080.71830 37602 3,286 080 190 - Mid-Tex Gas Division Addition 080.71832 37602 1,851,238 080 190 - Mid-Tex Gas Division Addition 080.71832 38000 37,780 080 190 - Mid-Tex Gas Division Addition 080.71833 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71835 37602 22,562 080 190 - Mid-Tex Gas Division Addition 080.71836 37602 7,931 080 190 - Mid-Tex Gas Division Addition 080.71836 38000 417 080 190 - Mid-Tex Gas Division Addition 080.71837 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71838 37602 5,853 080 190 - Mid-Tex Gas Division Addition 080.71839 37601 244,341 080 190 - Mid-Tex Gas Division Addition 080.71839 37602 10,262,344 080 190 - Mid-Tex Gas Division Addition 080.71839 37800 1,099,537 080 190 - Mid-Tex Gas Division Addition 080.71839 38000 610,854 080 190 - Mid-Tex Gas Division Addition 080.71849 37601 109,535 080 190 - Mid-Tex Gas Division Addition 080.71850 37601 149,881 080 190 - Mid-Tex Gas Division Addition 080.71850 37800 6,245 080 190 - Mid-Tex Gas Division Addition 080.71852 37602 253,693 080 190 - Mid-Tex Gas Division Addition 080.71855 37602 712 080 190 - Mid-Tex Gas Division Addition 080.71855 38000 178 080 190 - Mid-Tex Gas Division Addition 080.71856 37601 812,731 080 190 - Mid-Tex Gas Division Addition 080.71856 37602 290,330 080 190 - Mid-Tex Gas Division Addition 080.71856 38000 58,066 080 190 - Mid-Tex Gas Division Addition 080.71857 37602 54,209 080 190 - Mid-Tex Gas Division Addition 080.71857 38000 2,853 080 190 - Mid-Tex Gas Division Addition 080.71864 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71865 37601 209,517 080 190 - Mid-Tex Gas Division Addition 080.71869 37602 11 080 190 - Mid-Tex Gas Division Addition 080.71870 37602 3,503 080 190 - Mid-Tex Gas Division Addition 080.71874 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71875 37602 4,489 080 190 - Mid-Tex Gas Division Addition 080.71875 38000 499 080 190 - Mid-Tex Gas Division Addition 080.71878 37601 647 080 190 - Mid-Tex Gas Division Addition 080.71878 37602 3,669 MTX Additions by FERC Page 63 of 101 461 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.71882 37602 13,533 080 190 - Mid-Tex Gas Division Addition 080.71882 38000 1,504 080 190 - Mid-Tex Gas Division Addition 080.71884 37602 9,692 080 190 - Mid-Tex Gas Division Addition 080.71884 37800 174,448 080 190 - Mid-Tex Gas Division Addition 080.71884 38000 9,692 080 190 - Mid-Tex Gas Division Addition 080.71892 37601 3,328,742 080 190 - Mid-Tex Gas Division Addition 080.71894 37601 383,472 080 190 - Mid-Tex Gas Division Addition 080.71894 37602 920,333 080 190 - Mid-Tex Gas Division Addition 080.71894 37800 76,694 080 190 - Mid-Tex Gas Division Addition 080.71894 38000 153,389 080 190 - Mid-Tex Gas Division Addition 080.71900 37602 36,332 080 190 - Mid-Tex Gas Division Addition 080.71900 38000 24,221 080 190 - Mid-Tex Gas Division Addition 080.71902 37602 919 080 190 - Mid-Tex Gas Division Addition 080.71903 37602 20,084 080 190 - Mid-Tex Gas Division Addition 080.71905 37602 9,900 080 190 - Mid-Tex Gas Division Addition 080.71905 38000 1,747 080 190 - Mid-Tex Gas Division Addition 080.71907 37602 177,725 080 190 - Mid-Tex Gas Division Addition 080.71909 37602 168,044 080 190 - Mid-Tex Gas Division Addition 080.71910 37602 98,343 080 190 - Mid-Tex Gas Division Addition 080.71915 37602 2,665 080 190 - Mid-Tex Gas Division Addition 080.71919 37602 11,923 080 190 - Mid-Tex Gas Division Addition 080.71919 38000 1,037 080 190 - Mid-Tex Gas Division Addition 080.71921 37602 17,409 080 190 - Mid-Tex Gas Division Addition 080.71921 38000 11,130 080 190 - Mid-Tex Gas Division Addition 080.71922 37602 1,929 080 190 - Mid-Tex Gas Division Addition 080.71922 37800 4,501 080 190 - Mid-Tex Gas Division Addition 080.71923 37602 3,416 080 190 - Mid-Tex Gas Division Addition 080.71923 38000 35 080 190 - Mid-Tex Gas Division Addition 080.71929 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71931 37601 71,286 080 190 - Mid-Tex Gas Division Addition 080.71932 37602 27,923 080 190 - Mid-Tex Gas Division Addition 080.71933 37601 31,838 080 190 - Mid-Tex Gas Division Addition 080.71937 37602 1,937 080 190 - Mid-Tex Gas Division Addition 080.71938 37602 288 080 190 - Mid-Tex Gas Division Addition 080.71939 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71940 37602 11,285 080 190 - Mid-Tex Gas Division Addition 080.71942 37602 349 080 190 - Mid-Tex Gas Division Addition 080.71943 37601 206,856 080 190 - Mid-Tex Gas Division Addition 080.71943 37800 17,988 080 190 - Mid-Tex Gas Division Addition 080.71944 37602 12,403 080 190 - Mid-Tex Gas Division Addition 080.71944 38000 3,101 080 190 - Mid-Tex Gas Division Addition 080.71945 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71947 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71948 37602 52,447 080 190 - Mid-Tex Gas Division Addition 080.71948 38000 9,255 080 190 - Mid-Tex Gas Division Addition 080.71950 37602 11,627 080 190 - Mid-Tex Gas Division Addition 080.71951 37601 110,008 080 190 - Mid-Tex Gas Division Addition 080.71951 37800 1,111 080 190 - Mid-Tex Gas Division Addition 080.71952 37602 61,261 080 190 - Mid-Tex Gas Division Addition 080.71953 37602 - 080 190 - Mid-Tex Gas Division Addition 080.71954 37602 (81) 080 190 - Mid-Tex Gas Division Addition 080.71955 37602 1,683 080 190 - Mid-Tex Gas Division Addition 080.71955 38000 34 080 190 - Mid-Tex Gas Division Addition 080.71956 37602 395,985 080 190 - Mid-Tex Gas Division Addition 080.71956 38000 20,841 080 190 - Mid-Tex Gas Division Addition 080.71960 37602 14,920 080 190 - Mid-Tex Gas Division Addition 080.71960 38000 3,500 080 190 - Mid-Tex Gas Division Addition 080.71962 37602 22,019 080 190 - Mid-Tex Gas Division Addition 080.71962 38000 2,178 080 190 - Mid-Tex Gas Division Addition 080.71964 37602 66,321 080 190 - Mid-Tex Gas Division Addition 080.71965 37800 174 080 190 - Mid-Tex Gas Division Addition 080.71967 37602 1,437 080 190 - Mid-Tex Gas Division Addition 080.71967 37800 4,310 080 190 - Mid-Tex Gas Division Addition 080.71968 37602 732 080 190 - Mid-Tex Gas Division Addition 080.71969 37601 (51,222) 080 190 - Mid-Tex Gas Division Addition 080.71971 37602 14,769 080 190 - Mid-Tex Gas Division Addition 080.71971 38000 1,641 080 190 - Mid-Tex Gas Division Addition 080.71975 37601 27,910 080 190 - Mid-Tex Gas Division Addition 080.71975 37602 6,978 080 190 - Mid-Tex Gas Division Addition 080.71976 37602 8,836 080 190 - Mid-Tex Gas Division Addition 080.71976 38000 5,891 080 190 - Mid-Tex Gas Division Addition 080.71978 37602 (16,193) 080 190 - Mid-Tex Gas Division Addition 080.71982 37602 435,245 080 190 - Mid-Tex Gas Division Addition 080.71993 37601 204,405 080 190 - Mid-Tex Gas Division Addition 080.71995 37602 3,458 080 190 - Mid-Tex Gas Division Addition 080.71995 38000 182 080 190 - Mid-Tex Gas Division Addition 080.71996 37602 288 080 190 - Mid-Tex Gas Division Addition 080.71998 37602 14,342 080 190 - Mid-Tex Gas Division Addition 080.71998 38000 2,531 080 190 - Mid-Tex Gas Division Addition 080.71999 37602 1,242,698 080 190 - Mid-Tex Gas Division Addition 080.71999 38000 699,018 080 190 - Mid-Tex Gas Division Addition 080.72000 37602 43,832 080 190 - Mid-Tex Gas Division Addition 080.72000 38000 2,307 080 190 - Mid-Tex Gas Division Addition 080.72001 37601 132,567 080 190 - Mid-Tex Gas Division Addition 080.72001 37800 530,269 080 190 - Mid-Tex Gas Division Addition 080.72002 37602 7,126 080 190 - Mid-Tex Gas Division Addition 080.72002 38000 792 080 190 - Mid-Tex Gas Division Addition 080.72011 37602 20,996 080 190 - Mid-Tex Gas Division Addition 080.72011 38000 8,998 080 190 - Mid-Tex Gas Division Addition 080.72012 37602 22,179 080 190 - Mid-Tex Gas Division Addition 080.72014 37602 9 080 190 - Mid-Tex Gas Division Addition 080.72015 37602 22,067 080 190 - Mid-Tex Gas Division Addition 080.72016 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72019 37602 4,833 080 190 - Mid-Tex Gas Division Addition 080.72035 37602 3,277 080 190 - Mid-Tex Gas Division Addition 080.72035 38000 364 080 190 - Mid-Tex Gas Division Addition 080.72036 37602 80,835 080 190 - Mid-Tex Gas Division Addition 080.72036 38000 26,945 080 190 - Mid-Tex Gas Division Addition 080.72039 37602 51,723 080 190 - Mid-Tex Gas Division Addition 080.72039 38000 3,302 080 190 - Mid-Tex Gas Division Addition 080.72044 37601 46,577 080 190 - Mid-Tex Gas Division Addition 080.72045 37601 431,604 080 190 - Mid-Tex Gas Division Addition 080.72048 37602 7,924 080 190 - Mid-Tex Gas Division Addition 080.72048 38000 417 080 190 - Mid-Tex Gas Division Addition 080.72049 37602 9,208 080 190 - Mid-Tex Gas Division Addition 080.72057 37602 2,510 080 190 - Mid-Tex Gas Division Addition 080.72057 37800 (13) MTX Additions by FERC Page 64 of 101 462 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.72057 37900 1,255 080 190 - Mid-Tex Gas Division Addition 080.72058 37602 5,891 080 190 - Mid-Tex Gas Division Addition 080.72058 38000 233 080 190 - Mid-Tex Gas Division Addition 080.72063 37601 1,886 080 190 - Mid-Tex Gas Division Addition 080.72063 37602 1,508 080 190 - Mid-Tex Gas Division Addition 080.72063 37900 905 080 190 - Mid-Tex Gas Division Addition 080.72068 37602 2,130 080 190 - Mid-Tex Gas Division Addition 080.72074 37602 9,047 080 190 - Mid-Tex Gas Division Addition 080.72075 37602 1,829 080 190 - Mid-Tex Gas Division Addition 080.72075 38000 7,316 080 190 - Mid-Tex Gas Division Addition 080.72077 37602 2,412 080 190 - Mid-Tex Gas Division Addition 080.72078 37602 1,508 080 190 - Mid-Tex Gas Division Addition 080.72082 37602 1,683 080 190 - Mid-Tex Gas Division Addition 080.72085 37602 73,226 080 190 - Mid-Tex Gas Division Addition 080.72085 38000 27,083 080 190 - Mid-Tex Gas Division Addition 080.72092 39906 - 080 190 - Mid-Tex Gas Division Addition 080.72099 37602 24,231 080 190 - Mid-Tex Gas Division Addition 080.72103 37601 9,607 080 190 - Mid-Tex Gas Division Addition 080.72103 37602 4,803 080 190 - Mid-Tex Gas Division Addition 080.72103 37800 81,657 080 190 - Mid-Tex Gas Division Addition 080.72109 37602 66,703 080 190 - Mid-Tex Gas Division Addition 080.72111 37602 534 080 190 - Mid-Tex Gas Division Addition 080.72116 37602 4,323 080 190 - Mid-Tex Gas Division Addition 080.72119 37602 244,915 080 190 - Mid-Tex Gas Division Addition 080.72120 37602 11,535 080 190 - Mid-Tex Gas Division Addition 080.72120 38000 2,884 080 190 - Mid-Tex Gas Division Addition 080.72122 37601 1,303 080 190 - Mid-Tex Gas Division Addition 080.72122 37602 37,352 080 190 - Mid-Tex Gas Division Addition 080.72122 38000 4,778 080 190 - Mid-Tex Gas Division Addition 080.72123 37602 18,043 080 190 - Mid-Tex Gas Division Addition 080.72123 38000 4,511 080 190 - Mid-Tex Gas Division Addition 080.72135 37602 392,994 080 190 - Mid-Tex Gas Division Addition 080.72140 37602 5,753 080 190 - Mid-Tex Gas Division Addition 080.72140 38000 303 080 190 - Mid-Tex Gas Division Addition 080.72141 37602 13,431 080 190 - Mid-Tex Gas Division Addition 080.72142 37602 (43) 080 190 - Mid-Tex Gas Division Addition 080.72144 37602 52,512 080 190 - Mid-Tex Gas Division Addition 080.72145 37602 2,491 080 190 - Mid-Tex Gas Division Addition 080.72145 38000 131 080 190 - Mid-Tex Gas Division Addition 080.72155 37602 3,612 080 190 - Mid-Tex Gas Division Addition 080.72155 38000 903 080 190 - Mid-Tex Gas Division Addition 080.72158 37602 40,477 080 190 - Mid-Tex Gas Division Addition 080.72158 38000 2,130 080 190 - Mid-Tex Gas Division Addition 080.72162 37602 4,537 080 190 - Mid-Tex Gas Division Addition 080.72163 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72164 37602 13,044 080 190 - Mid-Tex Gas Division Addition 080.72164 38000 686 080 190 - Mid-Tex Gas Division Addition 080.72167 37600 250 080 190 - Mid-Tex Gas Division Addition 080.72168 37602 5,466 080 190 - Mid-Tex Gas Division Addition 080.72168 38000 607 080 190 - Mid-Tex Gas Division Addition 080.72170 37602 13,958 080 190 - Mid-Tex Gas Division Addition 080.72170 38000 285 080 190 - Mid-Tex Gas Division Addition 080.72174 37602 1,668 080 190 - Mid-Tex Gas Division Addition 080.72176 37602 2,622 080 190 - Mid-Tex Gas Division Addition 080.72176 38000 26 080 190 - Mid-Tex Gas Division Addition 080.72177 37602 7,631 080 190 - Mid-Tex Gas Division Addition 080.72180 37602 14,677 080 190 - Mid-Tex Gas Division Addition 080.72180 38000 775 080 190 - Mid-Tex Gas Division Addition 080.72181 37602 10,642 080 190 - Mid-Tex Gas Division Addition 080.72182 37602 419 080 190 - Mid-Tex Gas Division Addition 080.72187 37800 2,008 080 190 - Mid-Tex Gas Division Addition 080.72191 37601 286 080 190 - Mid-Tex Gas Division Addition 080.72191 37800 4,867 080 190 - Mid-Tex Gas Division Addition 080.72191 38100 573 080 190 - Mid-Tex Gas Division Addition 080.72192 37602 1,786 080 190 - Mid-Tex Gas Division Addition 080.72195 37602 (17,916) 080 190 - Mid-Tex Gas Division Addition 080.72196 37602 2,759 080 190 - Mid-Tex Gas Division Addition 080.72196 38000 145 080 190 - Mid-Tex Gas Division Addition 080.72199 37602 (121,218) 080 190 - Mid-Tex Gas Division Addition 080.72199 38000 (13,469) 080 190 - Mid-Tex Gas Division Addition 080.72202 37602 3,212 080 190 - Mid-Tex Gas Division Addition 080.72202 38000 66 080 190 - Mid-Tex Gas Division Addition 080.72203 37602 26,597 080 190 - Mid-Tex Gas Division Addition 080.72203 38000 2,955 080 190 - Mid-Tex Gas Division Addition 080.72204 37602 4,890 080 190 - Mid-Tex Gas Division Addition 080.72207 37602 542 080 190 - Mid-Tex Gas Division Addition 080.72208 37602 604,093 080 190 - Mid-Tex Gas Division Addition 080.72210 37602 472 080 190 - Mid-Tex Gas Division Addition 080.72223 37602 1,083,263 080 190 - Mid-Tex Gas Division Addition 080.72229 37602 1,579 080 190 - Mid-Tex Gas Division Addition 080.72231 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72231 38000 - 080 190 - Mid-Tex Gas Division Addition 080.72232 39400 3,996 080 190 - Mid-Tex Gas Division Addition 080.72233 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72235 37602 (15,801) 080 190 - Mid-Tex Gas Division Addition 080.72235 37800 (3,950) 080 190 - Mid-Tex Gas Division Addition 080.72238 37602 784 080 190 - Mid-Tex Gas Division Addition 080.72240 37602 77,802 080 190 - Mid-Tex Gas Division Addition 080.72240 38000 13,730 080 190 - Mid-Tex Gas Division Addition 080.72241 37602 3,524 080 190 - Mid-Tex Gas Division Addition 080.72242 37602 9,527 080 190 - Mid-Tex Gas Division Addition 080.72243 37602 322 080 190 - Mid-Tex Gas Division Addition 080.72247 37800 13,036 080 190 - Mid-Tex Gas Division Addition 080.72247 38000 73,869 080 190 - Mid-Tex Gas Division Addition 080.72248 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72248 38000 19,590 080 190 - Mid-Tex Gas Division Addition 080.72249 38000 (1,527) 080 190 - Mid-Tex Gas Division Addition 080.72249 38500 (1,018) 080 190 - Mid-Tex Gas Division Addition 080.72250 37602 (500) 080 190 - Mid-Tex Gas Division Addition 080.72250 38000 (6,994) 080 190 - Mid-Tex Gas Division Addition 080.72250 38500 (2,498) 080 190 - Mid-Tex Gas Division Addition 080.72251 37602 6,954 080 190 - Mid-Tex Gas Division Addition 080.72252 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72255 38000 4,074 080 190 - Mid-Tex Gas Division Addition 080.72259 37602 57 080 190 - Mid-Tex Gas Division Addition 080.72266 37601 275,257 080 190 - Mid-Tex Gas Division Addition 080.72266 38000 2,780 MTX Additions by FERC Page 65 of 101 463 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.72268 37800 1,475 080 190 - Mid-Tex Gas Division Addition 080.72270 37602 948,544 080 190 - Mid-Tex Gas Division Addition 080.72270 38000 105,394 080 190 - Mid-Tex Gas Division Addition 080.72272 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72273 37602 8,064 080 190 - Mid-Tex Gas Division Addition 080.72275 37602 14,139 080 190 - Mid-Tex Gas Division Addition 080.72275 38000 1,571 080 190 - Mid-Tex Gas Division Addition 080.72277 37800 3 080 190 - Mid-Tex Gas Division Addition 080.72278 37601 25,258 080 190 - Mid-Tex Gas Division Addition 080.72278 37602 88,403 080 190 - Mid-Tex Gas Division Addition 080.72278 38000 12,629 080 190 - Mid-Tex Gas Division Addition 080.72280 37602 205,607 080 190 - Mid-Tex Gas Division Addition 080.72281 37602 578 080 190 - Mid-Tex Gas Division Addition 080.72285 37602 426,195 080 190 - Mid-Tex Gas Division Addition 080.72286 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72289 37602 12,983 080 190 - Mid-Tex Gas Division Addition 080.72290 37602 7,027 080 190 - Mid-Tex Gas Division Addition 080.72290 38000 1,757 080 190 - Mid-Tex Gas Division Addition 080.72292 37602 28,985 080 190 - Mid-Tex Gas Division Addition 080.72292 38000 7,246 080 190 - Mid-Tex Gas Division Addition 080.72294 37602 5,156 080 190 - Mid-Tex Gas Division Addition 080.72299 37602 10,566 080 190 - Mid-Tex Gas Division Addition 080.72300 37602 149 080 190 - Mid-Tex Gas Division Addition 080.72300 38000 50 080 190 - Mid-Tex Gas Division Addition 080.72308 37602 3,075 080 190 - Mid-Tex Gas Division Addition 080.72310 37602 6,163 080 190 - Mid-Tex Gas Division Addition 080.72310 38000 685 080 190 - Mid-Tex Gas Division Addition 080.72311 37602 26,382 080 190 - Mid-Tex Gas Division Addition 080.72314 37602 10,094 080 190 - Mid-Tex Gas Division Addition 080.72315 37602 144,766 080 190 - Mid-Tex Gas Division Addition 080.72317 37602 (16) 080 190 - Mid-Tex Gas Division Addition 080.72320 37602 (48,528) 080 190 - Mid-Tex Gas Division Addition 080.72320 38000 (490) 080 190 - Mid-Tex Gas Division Addition 080.72321 37602 18,303 080 190 - Mid-Tex Gas Division Addition 080.72321 38000 1,592 080 190 - Mid-Tex Gas Division Addition 080.72322 37602 20,090 080 190 - Mid-Tex Gas Division Addition 080.72322 38000 2,232 080 190 - Mid-Tex Gas Division Addition 080.72324 37602 951,657 080 190 - Mid-Tex Gas Division Addition 080.72329 37602 478,082 080 190 - Mid-Tex Gas Division Addition 080.72336 37602 66,877 080 190 - Mid-Tex Gas Division Addition 080.72338 37602 5,799 080 190 - Mid-Tex Gas Division Addition 080.72339 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72345 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72347 37602 340,803 080 190 - Mid-Tex Gas Division Addition 080.72347 38000 17,937 080 190 - Mid-Tex Gas Division Addition 080.72348 37602 1,397 080 190 - Mid-Tex Gas Division Addition 080.72348 37800 5,588 080 190 - Mid-Tex Gas Division Addition 080.72352 37800 6,267 080 190 - Mid-Tex Gas Division Addition 080.72353 37602 7,328 080 190 - Mid-Tex Gas Division Addition 080.72353 38000 814 080 190 - Mid-Tex Gas Division Addition 080.72354 37602 11,813 080 190 - Mid-Tex Gas Division Addition 080.72354 38000 1,315 080 190 - Mid-Tex Gas Division Addition 080.72364 37602 217 080 190 - Mid-Tex Gas Division Addition 080.72367 37602 10,426 080 190 - Mid-Tex Gas Division Addition 080.72367 38000 549 080 190 - Mid-Tex Gas Division Addition 080.72368 38000 20,318 080 190 - Mid-Tex Gas Division Addition 080.72369 37601 76 080 190 - Mid-Tex Gas Division Addition 080.72369 37602 3,324 080 190 - Mid-Tex Gas Division Addition 080.72369 38000 420 080 190 - Mid-Tex Gas Division Addition 080.72371 37602 74,917 080 190 - Mid-Tex Gas Division Addition 080.72372 37602 434,067 080 190 - Mid-Tex Gas Division Addition 080.72372 38000 144,689 080 190 - Mid-Tex Gas Division Addition 080.72373 37601 58,958 080 190 - Mid-Tex Gas Division Addition 080.72373 37602 2,358 080 190 - Mid-Tex Gas Division Addition 080.72373 37800 5,896 080 190 - Mid-Tex Gas Division Addition 080.72373 37900 50,704 080 190 - Mid-Tex Gas Division Addition 080.72377 37602 4,194 080 190 - Mid-Tex Gas Division Addition 080.72379 37602 3 080 190 - Mid-Tex Gas Division Addition 080.72380 37602 8,533 080 190 - Mid-Tex Gas Division Addition 080.72385 37602 8,915 080 190 - Mid-Tex Gas Division Addition 080.72385 38000 991 080 190 - Mid-Tex Gas Division Addition 080.72386 37602 5,694 080 190 - Mid-Tex Gas Division Addition 080.72386 38000 633 080 190 - Mid-Tex Gas Division Addition 080.72387 37602 7,950 080 190 - Mid-Tex Gas Division Addition 080.72387 38000 883 080 190 - Mid-Tex Gas Division Addition 080.72388 37602 3,185 080 190 - Mid-Tex Gas Division Addition 080.72388 38000 562 080 190 - Mid-Tex Gas Division Addition 080.72389 37602 3,451 080 190 - Mid-Tex Gas Division Addition 080.72389 38000 383 080 190 - Mid-Tex Gas Division Addition 080.72390 37602 109,113 080 190 - Mid-Tex Gas Division Addition 080.72390 38000 19,255 080 190 - Mid-Tex Gas Division Addition 080.72391 37602 245,315 080 190 - Mid-Tex Gas Division Addition 080.72391 38000 12,911 080 190 - Mid-Tex Gas Division Addition 080.72392 37602 120,284 080 190 - Mid-Tex Gas Division Addition 080.72392 38000 13,365 080 190 - Mid-Tex Gas Division Addition 080.72401 37601 36,503 080 190 - Mid-Tex Gas Division Addition 080.72403 37601 (90,073) 080 190 - Mid-Tex Gas Division Addition 080.72408 37602 20,731 080 190 - Mid-Tex Gas Division Addition 080.72409 37602 445 080 190 - Mid-Tex Gas Division Addition 080.72412 37602 714 080 190 - Mid-Tex Gas Division Addition 080.72413 37601 756,396 080 190 - Mid-Tex Gas Division Addition 080.72413 37602 63,033 080 190 - Mid-Tex Gas Division Addition 080.72413 37800 432,822 080 190 - Mid-Tex Gas Division Addition 080.72415 38000 3,370 080 190 - Mid-Tex Gas Division Addition 080.72418 37601 413 080 190 - Mid-Tex Gas Division Addition 080.72418 37602 3,513 080 190 - Mid-Tex Gas Division Addition 080.72418 38000 207 080 190 - Mid-Tex Gas Division Addition 080.72420 37602 38,361 080 190 - Mid-Tex Gas Division Addition 080.72420 38000 2,019 080 190 - Mid-Tex Gas Division Addition 080.72421 37602 144,486 080 190 - Mid-Tex Gas Division Addition 080.72421 38000 1,460 080 190 - Mid-Tex Gas Division Addition 080.72426 37602 11,106 080 190 - Mid-Tex Gas Division Addition 080.72426 38000 2,777 080 190 - Mid-Tex Gas Division Addition 080.72431 37602 3,345 080 190 - Mid-Tex Gas Division Addition 080.72437 37602 9,493 080 190 - Mid-Tex Gas Division Addition 080.72437 38000 500 080 190 - Mid-Tex Gas Division Addition 080.72438 37602 256,957 MTX Additions by FERC Page 66 of 101 464 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.72438 38000 110,124 080 190 - Mid-Tex Gas Division Addition 080.72439 37602 867,868 080 190 - Mid-Tex Gas Division Addition 080.72439 38000 153,153 080 190 - Mid-Tex Gas Division Addition 080.72443 37602 16,809 080 190 - Mid-Tex Gas Division Addition 080.72443 38000 1,868 080 190 - Mid-Tex Gas Division Addition 080.72448 37602 26,200 080 190 - Mid-Tex Gas Division Addition 080.72448 38000 1,379 080 190 - Mid-Tex Gas Division Addition 080.72449 37602 28,787 080 190 - Mid-Tex Gas Division Addition 080.72449 38000 1,515 080 190 - Mid-Tex Gas Division Addition 080.72450 37602 32,609 080 190 - Mid-Tex Gas Division Addition 080.72450 38000 1,009 080 190 - Mid-Tex Gas Division Addition 080.72451 37602 14,248 080 190 - Mid-Tex Gas Division Addition 080.72451 38000 1,583 080 190 - Mid-Tex Gas Division Addition 080.72452 37602 111,922 080 190 - Mid-Tex Gas Division Addition 080.72452 38000 19,751 080 190 - Mid-Tex Gas Division Addition 080.72461 37602 11,299 080 190 - Mid-Tex Gas Division Addition 080.72461 38000 1,255 080 190 - Mid-Tex Gas Division Addition 080.72463 37602 5,014 080 190 - Mid-Tex Gas Division Addition 080.72467 37602 8,464 080 190 - Mid-Tex Gas Division Addition 080.72470 37602 16,131 080 190 - Mid-Tex Gas Division Addition 080.72473 37601 238,563 080 190 - Mid-Tex Gas Division Addition 080.72473 37602 79,521 080 190 - Mid-Tex Gas Division Addition 080.72473 37800 477,127 080 190 - Mid-Tex Gas Division Addition 080.72479 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72480 37601 (293,122) 080 190 - Mid-Tex Gas Division Addition 080.72490 37602 6,626 080 190 - Mid-Tex Gas Division Addition 080.72490 38000 349 080 190 - Mid-Tex Gas Division Addition 080.72491 37602 80 080 190 - Mid-Tex Gas Division Addition 080.72493 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72495 37602 9,526 080 190 - Mid-Tex Gas Division Addition 080.72495 38000 96 080 190 - Mid-Tex Gas Division Addition 080.72497 37602 9,177 080 190 - Mid-Tex Gas Division Addition 080.72497 38000 93 080 190 - Mid-Tex Gas Division Addition 080.72498 37602 9,796 080 190 - Mid-Tex Gas Division Addition 080.72498 38000 2,449 080 190 - Mid-Tex Gas Division Addition 080.72499 37602 24,077 080 190 - Mid-Tex Gas Division Addition 080.72499 38000 6,019 080 190 - Mid-Tex Gas Division Addition 080.72500 37602 (153,984) 080 190 - Mid-Tex Gas Division Addition 080.72502 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72504 37601 11,944 080 190 - Mid-Tex Gas Division Addition 080.72505 37602 14,401 080 190 - Mid-Tex Gas Division Addition 080.72505 38000 1,252 080 190 - Mid-Tex Gas Division Addition 080.72508 37800 69 080 190 - Mid-Tex Gas Division Addition 080.72508 38000 8 080 190 - Mid-Tex Gas Division Addition 080.72512 37602 15,158 080 190 - Mid-Tex Gas Division Addition 080.72512 38000 8,162 080 190 - Mid-Tex Gas Division Addition 080.72516 37602 370 080 190 - Mid-Tex Gas Division Addition 080.72517 37601 - 080 190 - Mid-Tex Gas Division Addition 080.72517 37602 1,937,434 080 190 - Mid-Tex Gas Division Addition 080.72518 37602 530,025 080 190 - Mid-Tex Gas Division Addition 080.72524 37602 188,372 080 190 - Mid-Tex Gas Division Addition 080.72524 38000 101,431 080 190 - Mid-Tex Gas Division Addition 080.72525 37602 323,147 080 190 - Mid-Tex Gas Division Addition 080.72525 38000 35,905 080 190 - Mid-Tex Gas Division Addition 080.72526 37602 372,564 080 190 - Mid-Tex Gas Division Addition 080.72526 38000 93,141 080 190 - Mid-Tex Gas Division Addition 080.72527 37602 308,664 080 190 - Mid-Tex Gas Division Addition 080.72527 38000 3,118 080 190 - Mid-Tex Gas Division Addition 080.72528 37602 306,248 080 190 - Mid-Tex Gas Division Addition 080.72528 38000 16,118 080 190 - Mid-Tex Gas Division Addition 080.72529 37602 458,290 080 190 - Mid-Tex Gas Division Addition 080.72529 38000 114,573 080 190 - Mid-Tex Gas Division Addition 080.72530 37602 698 080 190 - Mid-Tex Gas Division Addition 080.72532 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72533 37602 84,189 080 190 - Mid-Tex Gas Division Addition 080.72533 38000 14,857 080 190 - Mid-Tex Gas Division Addition 080.72534 37602 17,491 080 190 - Mid-Tex Gas Division Addition 080.72535 37602 216,112 080 190 - Mid-Tex Gas Division Addition 080.72535 38000 38,137 080 190 - Mid-Tex Gas Division Addition 080.72536 37602 211,397 080 190 - Mid-Tex Gas Division Addition 080.72536 38000 52,849 080 190 - Mid-Tex Gas Division Addition 080.72539 37601 15 080 190 - Mid-Tex Gas Division Addition 080.72539 37602 76,672 080 190 - Mid-Tex Gas Division Addition 080.72539 37800 15 080 190 - Mid-Tex Gas Division Addition 080.72542 37602 9,169 080 190 - Mid-Tex Gas Division Addition 080.72542 38000 1,019 080 190 - Mid-Tex Gas Division Addition 080.72544 37602 22,126 080 190 - Mid-Tex Gas Division Addition 080.72545 37602 17,670 080 190 - Mid-Tex Gas Division Addition 080.72550 37601 (4,906) 080 190 - Mid-Tex Gas Division Addition 080.72559 37602 411,845 080 190 - Mid-Tex Gas Division Addition 080.72563 37602 (92) 080 190 - Mid-Tex Gas Division Addition 080.72564 37602 5,277 080 190 - Mid-Tex Gas Division Addition 080.72568 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72569 37602 1,247 080 190 - Mid-Tex Gas Division Addition 080.72572 37602 11,805 080 190 - Mid-Tex Gas Division Addition 080.72572 38000 2,083 080 190 - Mid-Tex Gas Division Addition 080.72576 38100 43 080 190 - Mid-Tex Gas Division Addition 080.72577 37602 (47) 080 190 - Mid-Tex Gas Division Addition 080.72580 38100 6,813 080 190 - Mid-Tex Gas Division Addition 080.72582 38000 17,447 080 190 - Mid-Tex Gas Division Addition 080.72600 37602 3,147 080 190 - Mid-Tex Gas Division Addition 080.72600 38000 166 080 190 - Mid-Tex Gas Division Addition 080.72603 37602 7,186 080 190 - Mid-Tex Gas Division Addition 080.72604 37602 4,288 080 190 - Mid-Tex Gas Division Addition 080.72607 37602 14,791 080 190 - Mid-Tex Gas Division Addition 080.72607 38000 778 080 190 - Mid-Tex Gas Division Addition 080.72609 37602 151,247 080 190 - Mid-Tex Gas Division Addition 080.72610 37602 554 080 190 - Mid-Tex Gas Division Addition 080.72612 37602 614 080 190 - Mid-Tex Gas Division Addition 080.72616 37602 995 080 190 - Mid-Tex Gas Division Addition 080.72616 37900 2,322 080 190 - Mid-Tex Gas Division Addition 080.72617 37602 431,448 080 190 - Mid-Tex Gas Division Addition 080.72617 38000 107,862 080 190 - Mid-Tex Gas Division Addition 080.72618 37602 1,690 080 190 - Mid-Tex Gas Division Addition 080.72618 37800 1,690 080 190 - Mid-Tex Gas Division Addition 080.72621 37602 457,861 080 190 - Mid-Tex Gas Division Addition 080.72623 37602 15,950 MTX Additions by FERC Page 67 of 101 465 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.72623 38000 309 080 190 - Mid-Tex Gas Division Addition 080.72626 37601 100,509 080 190 - Mid-Tex Gas Division Addition 080.72636 37602 (180,843) 080 190 - Mid-Tex Gas Division Addition 080.72646 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72649 37602 333,590 080 190 - Mid-Tex Gas Division Addition 080.72649 38000 179,625 080 190 - Mid-Tex Gas Division Addition 080.72651 37602 406,368 080 190 - Mid-Tex Gas Division Addition 080.72651 38000 174,158 080 190 - Mid-Tex Gas Division Addition 080.72653 37602 13,559 080 190 - Mid-Tex Gas Division Addition 080.72654 39000 63,117 080 190 - Mid-Tex Gas Division Addition 080.72654 39100 71,694 080 190 - Mid-Tex Gas Division Addition 080.72654 39906 782 080 190 - Mid-Tex Gas Division Addition 080.72655 39000 13,953 080 190 - Mid-Tex Gas Division Addition 080.72655 39100 10,907 080 190 - Mid-Tex Gas Division Addition 080.72655 39906 119 080 190 - Mid-Tex Gas Division Addition 080.72656 37602 586,575 080 190 - Mid-Tex Gas Division Addition 080.72656 38000 65,175 080 190 - Mid-Tex Gas Division Addition 080.72658 37602 408,212 080 190 - Mid-Tex Gas Division Addition 080.72659 37602 72 080 190 - Mid-Tex Gas Division Addition 080.72663 37602 2,413 080 190 - Mid-Tex Gas Division Addition 080.72664 37602 260,319 080 190 - Mid-Tex Gas Division Addition 080.72665 37602 4,621 080 190 - Mid-Tex Gas Division Addition 080.72675 37602 1,106 080 190 - Mid-Tex Gas Division Addition 080.72678 37602 2,287 080 190 - Mid-Tex Gas Division Addition 080.72678 38000 120 080 190 - Mid-Tex Gas Division Addition 080.72683 37602 1,469 080 190 - Mid-Tex Gas Division Addition 080.72686 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72687 37601 32,220 080 190 - Mid-Tex Gas Division Addition 080.72691 37602 17,087 080 190 - Mid-Tex Gas Division Addition 080.72692 37602 320 080 190 - Mid-Tex Gas Division Addition 080.72695 37602 480,121 080 190 - Mid-Tex Gas Division Addition 080.72696 37602 1,894,567 080 190 - Mid-Tex Gas Division Addition 080.72696 38000 534,365 080 190 - Mid-Tex Gas Division Addition 080.72698 38000 (624) 080 190 - Mid-Tex Gas Division Addition 080.72698 38500 (936) 080 190 - Mid-Tex Gas Division Addition 080.72700 37601 364,864 080 190 - Mid-Tex Gas Division Addition 080.72700 37800 851,349 080 190 - Mid-Tex Gas Division Addition 080.72704 37602 (11,293) 080 190 - Mid-Tex Gas Division Addition 080.72704 38000 26,030 080 190 - Mid-Tex Gas Division Addition 080.72704 38100 1,212 080 190 - Mid-Tex Gas Division Addition 080.72705 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72707 37601 37,446 080 190 - Mid-Tex Gas Division Addition 080.72709 37602 21,434 080 190 - Mid-Tex Gas Division Addition 080.72709 38000 2,381 080 190 - Mid-Tex Gas Division Addition 080.72723 37602 807 080 190 - Mid-Tex Gas Division Addition 080.72724 37602 10,356 080 190 - Mid-Tex Gas Division Addition 080.72726 37602 820,142 080 190 - Mid-Tex Gas Division Addition 080.72726 38000 91,127 080 190 - Mid-Tex Gas Division Addition 080.72730 37602 408 080 190 - Mid-Tex Gas Division Addition 080.72737 37602 (23,774) 080 190 - Mid-Tex Gas Division Addition 080.72738 37602 2,167 080 190 - Mid-Tex Gas Division Addition 080.72738 38000 114 080 190 - Mid-Tex Gas Division Addition 080.72741 37602 10,185 080 190 - Mid-Tex Gas Division Addition 080.72742 37602 260,407 080 190 - Mid-Tex Gas Division Addition 080.72742 38000 2,630 080 190 - Mid-Tex Gas Division Addition 080.72743 37602 15,201 080 190 - Mid-Tex Gas Division Addition 080.72743 38000 1,689 080 190 - Mid-Tex Gas Division Addition 080.72744 37602 (3,166) 080 190 - Mid-Tex Gas Division Addition 080.72744 38000 352 080 190 - Mid-Tex Gas Division Addition 080.72746 37602 13,289 080 190 - Mid-Tex Gas Division Addition 080.72747 37602 386,169 080 190 - Mid-Tex Gas Division Addition 080.72751 37601 3,645,576 080 190 - Mid-Tex Gas Division Addition 080.72751 37800 911,394 080 190 - Mid-Tex Gas Division Addition 080.72752 37602 7,802 080 190 - Mid-Tex Gas Division Addition 080.72754 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72755 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72756 37601 17,746 080 190 - Mid-Tex Gas Division Addition 080.72757 37602 4,990 080 190 - Mid-Tex Gas Division Addition 080.72757 38000 263 080 190 - Mid-Tex Gas Division Addition 080.72758 37602 12,207 080 190 - Mid-Tex Gas Division Addition 080.72759 37601 350,048 080 190 - Mid-Tex Gas Division Addition 080.72759 37800 61,773 080 190 - Mid-Tex Gas Division Addition 080.72760 37602 544,948 080 190 - Mid-Tex Gas Division Addition 080.72760 38000 96,167 080 190 - Mid-Tex Gas Division Addition 080.72762 37602 46,248 080 190 - Mid-Tex Gas Division Addition 080.72762 38000 5,139 080 190 - Mid-Tex Gas Division Addition 080.72763 37602 1,001,973 080 190 - Mid-Tex Gas Division Addition 080.72763 38000 111,330 080 190 - Mid-Tex Gas Division Addition 080.72764 37601 2,933,920 080 190 - Mid-Tex Gas Division Addition 080.72764 37602 40,191 080 190 - Mid-Tex Gas Division Addition 080.72764 37800 924,386 080 190 - Mid-Tex Gas Division Addition 080.72764 38000 120,572 080 190 - Mid-Tex Gas Division Addition 080.72765 37602 15,538 080 190 - Mid-Tex Gas Division Addition 080.72765 38000 1,351 080 190 - Mid-Tex Gas Division Addition 080.72767 37602 508 080 190 - Mid-Tex Gas Division Addition 080.72767 38000 44 080 190 - Mid-Tex Gas Division Addition 080.72773 37602 9,626 080 190 - Mid-Tex Gas Division Addition 080.72773 38000 2,406 080 190 - Mid-Tex Gas Division Addition 080.72775 37602 1,801 080 190 - Mid-Tex Gas Division Addition 080.72775 38000 95 080 190 - Mid-Tex Gas Division Addition 080.72776 37602 (29) 080 190 - Mid-Tex Gas Division Addition 080.72780 37602 17,356 080 190 - Mid-Tex Gas Division Addition 080.72780 38000 3,123 080 190 - Mid-Tex Gas Division Addition 080.72782 37602 483 080 190 - Mid-Tex Gas Division Addition 080.72783 37602 629 080 190 - Mid-Tex Gas Division Addition 080.72784 37602 321,964 080 190 - Mid-Tex Gas Division Addition 080.72785 37602 9,780 080 190 - Mid-Tex Gas Division Addition 080.72785 38000 1,726 080 190 - Mid-Tex Gas Division Addition 080.72786 37602 1,898 080 190 - Mid-Tex Gas Division Addition 080.72788 37602 1,437 080 190 - Mid-Tex Gas Division Addition 080.72788 38000 0 080 190 - Mid-Tex Gas Division Addition 080.72789 37602 10,078 080 190 - Mid-Tex Gas Division Addition 080.72795 37602 350 080 190 - Mid-Tex Gas Division Addition 080.72800 37602 881 080 190 - Mid-Tex Gas Division Addition 080.72801 38000 24,238 080 190 - Mid-Tex Gas Division Addition 080.72802 37602 1,728 080 190 - Mid-Tex Gas Division Addition 080.72809 37602 11,433 MTX Additions by FERC Page 68 of 101 466 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.72809 38000 602 080 190 - Mid-Tex Gas Division Addition 080.72811 37601 218 080 190 - Mid-Tex Gas Division Addition 080.72811 37800 42 080 190 - Mid-Tex Gas Division Addition 080.72816 37602 321 080 190 - Mid-Tex Gas Division Addition 080.72818 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72819 37602 333,268 080 190 - Mid-Tex Gas Division Addition 080.72825 37602 26,721 080 190 - Mid-Tex Gas Division Addition 080.72825 38000 435 080 190 - Mid-Tex Gas Division Addition 080.72826 37602 119 080 190 - Mid-Tex Gas Division Addition 080.72829 37602 51,989 080 190 - Mid-Tex Gas Division Addition 080.72831 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72832 37800 964 080 190 - Mid-Tex Gas Division Addition 080.72834 37602 242,609 080 190 - Mid-Tex Gas Division Addition 080.72835 37800 177,642 080 190 - Mid-Tex Gas Division Addition 080.72837 37602 35,549 080 190 - Mid-Tex Gas Division Addition 080.72837 38000 8,888 080 190 - Mid-Tex Gas Division Addition 080.72839 37602 52,471 080 190 - Mid-Tex Gas Division Addition 080.72840 37602 1,749,962 080 190 - Mid-Tex Gas Division Addition 080.72840 38000 583,321 080 190 - Mid-Tex Gas Division Addition 080.72841 37602 84,411 080 190 - Mid-Tex Gas Division Addition 080.72846 37602 4,476 080 190 - Mid-Tex Gas Division Addition 080.72847 37602 373 080 190 - Mid-Tex Gas Division Addition 080.72848 37602 288 080 190 - Mid-Tex Gas Division Addition 080.72849 37602 1,355 080 190 - Mid-Tex Gas Division Addition 080.72855 37602 27,792 080 190 - Mid-Tex Gas Division Addition 080.72858 37602 151,048 080 190 - Mid-Tex Gas Division Addition 080.72860 37602 227,652 080 190 - Mid-Tex Gas Division Addition 080.72861 37602 177,289 080 190 - Mid-Tex Gas Division Addition 080.72862 37602 147,777 080 190 - Mid-Tex Gas Division Addition 080.72863 39400 22,336 080 190 - Mid-Tex Gas Division Addition 080.72866 37602 2,549 080 190 - Mid-Tex Gas Division Addition 080.72867 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72868 37602 1,755 080 190 - Mid-Tex Gas Division Addition 080.72869 37602 39,421 080 190 - Mid-Tex Gas Division Addition 080.72869 38000 4,380 080 190 - Mid-Tex Gas Division Addition 080.72871 37602 (4,803) 080 190 - Mid-Tex Gas Division Addition 080.72872 37602 3,067 080 190 - Mid-Tex Gas Division Addition 080.72872 38000 292 080 190 - Mid-Tex Gas Division Addition 080.72874 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72878 37602 71,305 080 190 - Mid-Tex Gas Division Addition 080.72880 37602 21,496 080 190 - Mid-Tex Gas Division Addition 080.72883 37602 206 080 190 - Mid-Tex Gas Division Addition 080.72884 37602 1,526 080 190 - Mid-Tex Gas Division Addition 080.72884 38000 170 080 190 - Mid-Tex Gas Division Addition 080.72885 38000 205,035 080 190 - Mid-Tex Gas Division Addition 080.72886 38000 86,337 080 190 - Mid-Tex Gas Division Addition 080.72888 37602 588 080 190 - Mid-Tex Gas Division Addition 080.72889 37602 478,165 080 190 - Mid-Tex Gas Division Addition 080.72891 37601 5,157 080 190 - Mid-Tex Gas Division Addition 080.72891 37602 12,894 080 190 - Mid-Tex Gas Division Addition 080.72891 37800 7,736 080 190 - Mid-Tex Gas Division Addition 080.72899 37602 3,807 080 190 - Mid-Tex Gas Division Addition 080.72905 37602 40,508 080 190 - Mid-Tex Gas Division Addition 080.72906 37602 666,856 080 190 - Mid-Tex Gas Division Addition 080.72906 38000 222,285 080 190 - Mid-Tex Gas Division Addition 080.72910 37602 4,542 080 190 - Mid-Tex Gas Division Addition 080.72910 38000 239 080 190 - Mid-Tex Gas Division Addition 080.72912 37602 (65) 080 190 - Mid-Tex Gas Division Addition 080.72914 37602 (185) 080 190 - Mid-Tex Gas Division Addition 080.72921 37602 4,821 080 190 - Mid-Tex Gas Division Addition 080.72921 38000 536 080 190 - Mid-Tex Gas Division Addition 080.72922 37601 155 080 190 - Mid-Tex Gas Division Addition 080.72923 37602 1,485 080 190 - Mid-Tex Gas Division Addition 080.72924 37602 837 080 190 - Mid-Tex Gas Division Addition 080.72926 37600 111,819 080 190 - Mid-Tex Gas Division Addition 080.72927 37600 2,684 080 190 - Mid-Tex Gas Division Addition 080.72928 37600 8,124 080 190 - Mid-Tex Gas Division Addition 080.72929 37600 - 080 190 - Mid-Tex Gas Division Addition 080.72930 37602 384,155 080 190 - Mid-Tex Gas Division Addition 080.72935 37602 96,420 080 190 - Mid-Tex Gas Division Addition 080.72935 38000 17,015 080 190 - Mid-Tex Gas Division Addition 080.72947 37602 143 080 190 - Mid-Tex Gas Division Addition 080.72948 37602 188 080 190 - Mid-Tex Gas Division Addition 080.72949 37800 (59) 080 190 - Mid-Tex Gas Division Addition 080.72951 37602 365 080 190 - Mid-Tex Gas Division Addition 080.72954 37602 63,380 080 190 - Mid-Tex Gas Division Addition 080.72954 38000 1,293 080 190 - Mid-Tex Gas Division Addition 080.72956 37602 329 080 190 - Mid-Tex Gas Division Addition 080.72959 37602 8,831 080 190 - Mid-Tex Gas Division Addition 080.72959 38000 465 080 190 - Mid-Tex Gas Division Addition 080.72960 37602 29,422 080 190 - Mid-Tex Gas Division Addition 080.72960 38000 3,269 080 190 - Mid-Tex Gas Division Addition 080.72961 37602 - 080 190 - Mid-Tex Gas Division Addition 080.72965 37602 262 080 190 - Mid-Tex Gas Division Addition 080.72967 37602 12 080 190 - Mid-Tex Gas Division Addition 080.72969 37602 6,445 080 190 - Mid-Tex Gas Division Addition 080.72969 38000 1,137 080 190 - Mid-Tex Gas Division Addition 080.72970 37602 57,192 080 190 - Mid-Tex Gas Division Addition 080.72970 38000 3,010 080 190 - Mid-Tex Gas Division Addition 080.72973 37602 22,834 080 190 - Mid-Tex Gas Division Addition 080.72973 38000 9,786 080 190 - Mid-Tex Gas Division Addition 080.72974 37602 5,673 080 190 - Mid-Tex Gas Division Addition 080.72975 37602 68,289 080 190 - Mid-Tex Gas Division Addition 080.72975 38000 3,594 080 190 - Mid-Tex Gas Division Addition 080.72978 37602 14,422 080 190 - Mid-Tex Gas Division Addition 080.72978 38000 759 080 190 - Mid-Tex Gas Division Addition 080.72982 37602 238,219 080 190 - Mid-Tex Gas Division Addition 080.72983 37602 21,457 080 190 - Mid-Tex Gas Division Addition 080.72983 38000 5,364 080 190 - Mid-Tex Gas Division Addition 080.72987 37602 254,480 080 190 - Mid-Tex Gas Division Addition 080.72987 38000 137,028 080 190 - Mid-Tex Gas Division Addition 080.72988 37602 350,523 080 190 - Mid-Tex Gas Division Addition 080.72988 38000 61,857 080 190 - Mid-Tex Gas Division Addition 080.72989 37602 1,021 080 190 - Mid-Tex Gas Division Addition 080.72990 37602 136,295 080 190 - Mid-Tex Gas Division Addition 080.72990 38000 58,412 080 190 - Mid-Tex Gas Division Addition 080.72991 37602 345,528 MTX Additions by FERC Page 69 of 101 467 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.72991 38000 148,084 080 190 - Mid-Tex Gas Division Addition 080.73006 37602 238 080 190 - Mid-Tex Gas Division Addition 080.73007 37602 10,432 080 190 - Mid-Tex Gas Division Addition 080.73007 38000 1,159 080 190 - Mid-Tex Gas Division Addition 080.73018 37602 420,888 080 190 - Mid-Tex Gas Division Addition 080.73019 37602 67,047 080 190 - Mid-Tex Gas Division Addition 080.73023 37602 54,192 080 190 - Mid-Tex Gas Division Addition 080.73024 37602 76,312 080 190 - Mid-Tex Gas Division Addition 080.73024 38000 42,926 080 190 - Mid-Tex Gas Division Addition 080.73025 37602 47,639 080 190 - Mid-Tex Gas Division Addition 080.73025 38000 11,910 080 190 - Mid-Tex Gas Division Addition 080.73026 37602 43,111 080 190 - Mid-Tex Gas Division Addition 080.73026 38000 14,370 080 190 - Mid-Tex Gas Division Addition 080.73027 37602 124,029 080 190 - Mid-Tex Gas Division Addition 080.73027 38000 53,155 080 190 - Mid-Tex Gas Division Addition 080.73028 37602 18,449 080 190 - Mid-Tex Gas Division Addition 080.73028 38000 12,299 080 190 - Mid-Tex Gas Division Addition 080.73029 37602 29,186 080 190 - Mid-Tex Gas Division Addition 080.73029 38000 5,559 080 190 - Mid-Tex Gas Division Addition 080.73030 37602 128,470 080 190 - Mid-Tex Gas Division Addition 080.73030 38000 42,823 080 190 - Mid-Tex Gas Division Addition 080.73031 37602 56,122 080 190 - Mid-Tex Gas Division Addition 080.73031 38000 18,707 080 190 - Mid-Tex Gas Division Addition 080.73032 37602 47,442 080 190 - Mid-Tex Gas Division Addition 080.73032 38000 30,331 080 190 - Mid-Tex Gas Division Addition 080.73033 37602 52,494 080 190 - Mid-Tex Gas Division Addition 080.73033 38000 23,037 080 190 - Mid-Tex Gas Division Addition 080.73039 37602 23,307 080 190 - Mid-Tex Gas Division Addition 080.73046 37602 347 080 190 - Mid-Tex Gas Division Addition 080.73049 39000 - 080 190 - Mid-Tex Gas Division Addition 080.73050 37602 8,444 080 190 - Mid-Tex Gas Division Addition 080.73053 37602 32,271 080 190 - Mid-Tex Gas Division Addition 080.73053 38000 5,695 080 190 - Mid-Tex Gas Division Addition 080.73058 37602 4,080 080 190 - Mid-Tex Gas Division Addition 080.73058 38000 1,020 080 190 - Mid-Tex Gas Division Addition 080.73061 37602 481 080 190 - Mid-Tex Gas Division Addition 080.73068 37602 10,356 080 190 - Mid-Tex Gas Division Addition 080.73068 38000 1,151 080 190 - Mid-Tex Gas Division Addition 080.73070 37601 21,441 080 190 - Mid-Tex Gas Division Addition 080.73071 37602 15,632 080 190 - Mid-Tex Gas Division Addition 080.73071 37800 29,032 080 190 - Mid-Tex Gas Division Addition 080.73079 37602 6,626 080 190 - Mid-Tex Gas Division Addition 080.73083 37602 27,424 080 190 - Mid-Tex Gas Division Addition 080.73083 38000 12,905 080 190 - Mid-Tex Gas Division Addition 080.73084 37602 - 080 190 - Mid-Tex Gas Division Addition 080.73086 37602 157 080 190 - Mid-Tex Gas Division Addition 080.73088 37602 2,435 080 190 - Mid-Tex Gas Division Addition 080.73089 37602 12,591 080 190 - Mid-Tex Gas Division Addition 080.73089 37800 50,364 080 190 - Mid-Tex Gas Division Addition 080.73091 37602 7,378 080 190 - Mid-Tex Gas Division Addition 080.73094 37602 6,668 080 190 - Mid-Tex Gas Division Addition 080.73094 38000 7,313 080 190 - Mid-Tex Gas Division Addition 080.73098 37602 5,594 080 190 - Mid-Tex Gas Division Addition 080.73098 38000 294 080 190 - Mid-Tex Gas Division Addition 080.73103 37602 - 080 190 - Mid-Tex Gas Division Addition 080.73107 37602 22,066 080 190 - Mid-Tex Gas Division Addition 080.73107 38000 1,161 080 190 - Mid-Tex Gas Division Addition 080.73110 37602 66 080 190 - Mid-Tex Gas Division Addition 080.73111 37602 28,843 080 190 - Mid-Tex Gas Division Addition 080.73111 38000 3,933 080 190 - Mid-Tex Gas Division Addition 080.73112 37602 12,645 080 190 - Mid-Tex Gas Division Addition 080.73112 38000 3,161 080 190 - Mid-Tex Gas Division Addition 080.73114 37602 34,473 080 190 - Mid-Tex Gas Division Addition 080.73119 37602 - 080 190 - Mid-Tex Gas Division Addition 080.73123 37602 65,219 080 190 - Mid-Tex Gas Division Addition 080.73131 37602 183 080 190 - Mid-Tex Gas Division Addition 080.73133 37602 748 080 190 - Mid-Tex Gas Division Addition 080.73134 37602 (68) 080 190 - Mid-Tex Gas Division Addition 080.73135 37602 2,340 080 190 - Mid-Tex Gas Division Addition 080.73135 38000 413 080 190 - Mid-Tex Gas Division Addition 080.73137 37602 4,327 080 190 - Mid-Tex Gas Division Addition 080.73137 38000 2,885 080 190 - Mid-Tex Gas Division Addition 080.73138 37602 177,103 080 190 - Mid-Tex Gas Division Addition 080.73139 37602 1,298 080 190 - Mid-Tex Gas Division Addition 080.73140 37602 2,211 080 190 - Mid-Tex Gas Division Addition 080.73141 37602 43,991 080 190 - Mid-Tex Gas Division Addition 080.73142 37602 24,382 080 190 - Mid-Tex Gas Division Addition 080.73143 37602 2,101,920 080 190 - Mid-Tex Gas Division Addition 080.73147 37602 2,784 080 190 - Mid-Tex Gas Division Addition 080.73147 37800 2,505 080 190 - Mid-Tex Gas Division Addition 080.73147 38000 278 080 190 - Mid-Tex Gas Division Addition 080.73148 37602 1,362 080 190 - Mid-Tex Gas Division Addition 080.73153 37602 140,929 080 190 - Mid-Tex Gas Division Addition 080.73155 37602 3,115 080 190 - Mid-Tex Gas Division Addition 080.73158 37602 12,805 080 190 - Mid-Tex Gas Division Addition 080.73159 37602 274,004 080 190 - Mid-Tex Gas Division Addition 080.73159 38000 14,421 080 190 - Mid-Tex Gas Division Addition 080.73163 37602 1,632 080 190 - Mid-Tex Gas Division Addition 080.73164 37602 385,284 080 190 - Mid-Tex Gas Division Addition 080.73164 38000 96,321 080 190 - Mid-Tex Gas Division Addition 080.73165 37602 4,353 080 190 - Mid-Tex Gas Division Addition 080.73165 38000 158 080 190 - Mid-Tex Gas Division Addition 080.73169 37601 2,757 080 190 - Mid-Tex Gas Division Addition 080.73169 37602 87,313 080 190 - Mid-Tex Gas Division Addition 080.73169 38000 1,838 080 190 - Mid-Tex Gas Division Addition 080.73171 37602 117,570 080 190 - Mid-Tex Gas Division Addition 080.73173 37602 81,001 080 190 - Mid-Tex Gas Division Addition 080.73174 37602 892 080 190 - Mid-Tex Gas Division Addition 080.73174 38000 298 080 190 - Mid-Tex Gas Division Addition 080.73175 37602 13,621 080 190 - Mid-Tex Gas Division Addition 080.73182 37602 1,815,878 080 190 - Mid-Tex Gas Division Addition 080.73182 38000 425,947 080 190 - Mid-Tex Gas Division Addition 080.73183 37602 4,556 080 190 - Mid-Tex Gas Division Addition 080.73184 37602 451 080 190 - Mid-Tex Gas Division Addition 080.73192 37602 1,662,850 080 190 - Mid-Tex Gas Division Addition 080.73193 37602 48,879 080 190 - Mid-Tex Gas Division Addition 080.73194 37602 61,299 MTX Additions by FERC Page 70 of 101 468 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.73194 38000 10,818 080 190 - Mid-Tex Gas Division Addition 080.73199 37602 1,230 080 190 - Mid-Tex Gas Division Addition 080.73206 37602 - 080 190 - Mid-Tex Gas Division Addition 080.73210 37601 488 080 190 - Mid-Tex Gas Division Addition 080.73214 37602 3,013 080 190 - Mid-Tex Gas Division Addition 080.73215 37602 54 080 190 - Mid-Tex Gas Division Addition 080.73216 37602 70,211 080 190 - Mid-Tex Gas Division Addition 080.73220 37602 10,094 080 190 - Mid-Tex Gas Division Addition 080.73220 38000 (7,661) 080 190 - Mid-Tex Gas Division Addition 080.73221 37602 13,199 080 190 - Mid-Tex Gas Division Addition 080.73221 38000 10,799 080 190 - Mid-Tex Gas Division Addition 080.73224 37602 5,686 080 190 - Mid-Tex Gas Division Addition 080.73224 38000 2,437 080 190 - Mid-Tex Gas Division Addition 080.73225 37602 75,432 080 190 - Mid-Tex Gas Division Addition 080.73226 37602 20,410 080 190 - Mid-Tex Gas Division Addition 080.73226 38000 13,607 080 190 - Mid-Tex Gas Division Addition 080.73228 37602 16,784 080 190 - Mid-Tex Gas Division Addition 080.73228 38000 13,732 080 190 - Mid-Tex Gas Division Addition 080.73230 37602 17,450 080 190 - Mid-Tex Gas Division Addition 080.73233 37602 12,518 080 190 - Mid-Tex Gas Division Addition 080.73235 37602 3,709 080 190 - Mid-Tex Gas Division Addition 080.73238 37602 109,505 080 190 - Mid-Tex Gas Division Addition 080.73241 37602 42,801 080 190 - Mid-Tex Gas Division Addition 080.73245 37602 226,079 080 190 - Mid-Tex Gas Division Addition 080.73246 37602 76,784 080 190 - Mid-Tex Gas Division Addition 080.73247 37602 3,113 080 190 - Mid-Tex Gas Division Addition 080.73251 37602 133 080 190 - Mid-Tex Gas Division Addition 080.73252 37602 7,610 080 190 - Mid-Tex Gas Division Addition 080.73252 38000 - 080 190 - Mid-Tex Gas Division Addition 080.73253 37602 564 080 190 - Mid-Tex Gas Division Addition 080.73254 38000 51,334 080 190 - Mid-Tex Gas Division Addition 080.73255 37602 12,700 080 190 - Mid-Tex Gas Division Addition 080.73256 37602 801 080 190 - Mid-Tex Gas Division Addition 080.73257 37602 520 080 190 - Mid-Tex Gas Division Addition 080.73259 37602 1,832 080 190 - Mid-Tex Gas Division Addition 080.73260 37800 762 080 190 - Mid-Tex Gas Division Addition 080.73261 37602 52,861 080 190 - Mid-Tex Gas Division Addition 080.73263 37602 (28) 080 190 - Mid-Tex Gas Division Addition 080.73265 38000 18,785 080 190 - Mid-Tex Gas Division Addition 080.73266 38000 18,451 080 190 - Mid-Tex Gas Division Addition 080.73267 37602 9,542 080 190 - Mid-Tex Gas Division Addition 080.73267 38000 1,060 080 190 - Mid-Tex Gas Division Addition 080.73269 37602 185,256 080 190 - Mid-Tex Gas Division Addition 080.73273 37602 47,646 080 190 - Mid-Tex Gas Division Addition 080.73273 38000 31,764 080 190 - Mid-Tex Gas Division Addition 080.73280 37602 - 080 190 - Mid-Tex Gas Division Addition 080.73283 37602 4,945 080 190 - Mid-Tex Gas Division Addition 080.73283 38000 873 080 190 - Mid-Tex Gas Division Addition 080.73284 37602 6,432 080 190 - Mid-Tex Gas Division Addition 080.73285 37602 80,973 080 190 - Mid-Tex Gas Division Addition 080.73286 37602 15,578 080 190 - Mid-Tex Gas Division Addition 080.73288 37602 4,804 080 190 - Mid-Tex Gas Division Addition 080.73288 38000 655 080 190 - Mid-Tex Gas Division Addition 080.73293 38000 2,261 080 190 - Mid-Tex Gas Division Addition 080.73297 37602 24,854 080 190 - Mid-Tex Gas Division Addition 080.73300 37602 80,861 080 190 - Mid-Tex Gas Division Addition 080.73300 38000 4,256 080 190 - Mid-Tex Gas Division Addition 080.73301 37602 13 080 190 - Mid-Tex Gas Division Addition 080.73303 37602 - 080 190 - Mid-Tex Gas Division Addition 080.73304 37602 3,366 080 190 - Mid-Tex Gas Division Addition 080.73305 38000 52 080 190 - Mid-Tex Gas Division Addition 080.73306 37602 5,065 080 190 - Mid-Tex Gas Division Addition 080.73306 38000 267 080 190 - Mid-Tex Gas Division Addition 080.73308 37602 22,437 080 190 - Mid-Tex Gas Division Addition 080.73308 37800 1,320 080 190 - Mid-Tex Gas Division Addition 080.73308 38000 2,640 080 190 - Mid-Tex Gas Division Addition 080.73309 37602 9,301 080 190 - Mid-Tex Gas Division Addition 080.73309 38000 1,641 080 190 - Mid-Tex Gas Division Addition 080.73315 37602 733,653 080 190 - Mid-Tex Gas Division Addition 080.73322 37602 1,555,083 080 190 - Mid-Tex Gas Division Addition 080.73322 38000 99,261 080 190 - Mid-Tex Gas Division Addition 080.73326 37602 801 080 190 - Mid-Tex Gas Division Addition 080.73327 37602 1,465 080 190 - Mid-Tex Gas Division Addition 080.73327 38000 15 080 190 - Mid-Tex Gas Division Addition 080.73328 37602 215,755 080 190 - Mid-Tex Gas Division Addition 080.73329 37602 135,463 080 190 - Mid-Tex Gas Division Addition 080.73329 38000 7,130 080 190 - Mid-Tex Gas Division Addition 080.73335 37602 285 080 190 - Mid-Tex Gas Division Addition 080.73342 37602 72,174 080 190 - Mid-Tex Gas Division Addition 080.73342 37800 72,174 080 190 - Mid-Tex Gas Division Addition 080.73343 37602 1,792 080 190 - Mid-Tex Gas Division Addition 080.73347 37602 2,029 080 190 - Mid-Tex Gas Division Addition 080.73347 37800 1,353 080 190 - Mid-Tex Gas Division Addition 080.73348 37602 2,186 080 190 - Mid-Tex Gas Division Addition 080.73349 37602 0 080 190 - Mid-Tex Gas Division Addition 080.73350 37602 16,382 080 190 - Mid-Tex Gas Division Addition 080.73351 37602 (66) 080 190 - Mid-Tex Gas Division Addition 080.73352 37601 958,394 080 190 - Mid-Tex Gas Division Addition 080.73357 37602 - 080 190 - Mid-Tex Gas Division Addition 080.73358 37602 32,808 080 190 - Mid-Tex Gas Division Addition 080.73358 38000 14,061 080 190 - Mid-Tex Gas Division Addition 080.73361 37602 4,184 080 190 - Mid-Tex Gas Division Addition 080.73362 37602 257 080 190 - Mid-Tex Gas Division Addition 080.73362 38000 14 080 190 - Mid-Tex Gas Division Addition 080.73371 37602 224,112 080 190 - Mid-Tex Gas Division Addition 080.73371 38000 74,704 080 190 - Mid-Tex Gas Division Addition 080.73372 39500 (48,696) 080 190 - Mid-Tex Gas Division Addition 080.73375 37602 265,261 080 190 - Mid-Tex Gas Division Addition 080.73379 37602 2,372 080 190 - Mid-Tex Gas Division Addition 080.73379 38000 125 080 190 - Mid-Tex Gas Division Addition 080.73380 37602 107 080 190 - Mid-Tex Gas Division Addition 080.73382 37602 615 080 190 - Mid-Tex Gas Division Addition 080.73384 37602 2,075 080 190 - Mid-Tex Gas Division Addition 080.73386 37602 1,983 080 190 - Mid-Tex Gas Division Addition 080.73387 37602 64,474 080 190 - Mid-Tex Gas Division Addition 080.73388 37602 25,434 080 190 - Mid-Tex Gas Division Addition 080.73389 37602 706 MTX Additions by FERC Page 71 of 101 469 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.73389 38000 37 080 190 - Mid-Tex Gas Division Addition 080.73390 37602 253,790 080 190 - Mid-Tex Gas Division Addition 080.73391 37602 1,788 080 190 - Mid-Tex Gas Division Addition 080.73393 39000 2,300,598 080 190 - Mid-Tex Gas Division Addition 080.73399 37602 9,838,806 080 190 - Mid-Tex Gas Division Addition 080.73405 37602 13,628 080 190 - Mid-Tex Gas Division Addition 080.73405 38000 2,405 080 190 - Mid-Tex Gas Division Addition 080.73406 37602 7,310 080 190 - Mid-Tex Gas Division Addition 080.73406 38000 1,290 080 190 - Mid-Tex Gas Division Addition 080.73407 37602 13,742 080 190 - Mid-Tex Gas Division Addition 080.73407 38000 5,890 080 190 - Mid-Tex Gas Division Addition 080.73410 37602 6,308 080 190 - Mid-Tex Gas Division Addition 080.73410 38000 2,703 080 190 - Mid-Tex Gas Division Addition 080.73411 37602 553,110 080 190 - Mid-Tex Gas Division Addition 080.73411 38000 138,277 080 190 - Mid-Tex Gas Division Addition 080.73413 37602 15,118 080 190 - Mid-Tex Gas Division Addition 080.73413 38000 3,779 080 190 - Mid-Tex Gas Division Addition 080.73414 37602 - 080 190 - Mid-Tex Gas Division Addition 080.73430 37602 223 080 190 - Mid-Tex Gas Division Addition 080.73439 37602 897 080 190 - Mid-Tex Gas Division Addition 080.73442 37602 16,009 080 190 - Mid-Tex Gas Division Addition 080.73442 38000 5,336 080 190 - Mid-Tex Gas Division Addition 080.73443 38000 4,599 080 190 - Mid-Tex Gas Division Addition 080.73450 37602 22,856 080 190 - Mid-Tex Gas Division Addition 080.73450 38000 1,203 080 190 - Mid-Tex Gas Division Addition 080.73451 37602 21,265 080 190 - Mid-Tex Gas Division Addition 080.73452 37602 145,632 080 190 - Mid-Tex Gas Division Addition 080.73452 38000 7,665 080 190 - Mid-Tex Gas Division Addition 080.73453 37602 28,454 080 190 - Mid-Tex Gas Division Addition 080.73453 38000 229 080 190 - Mid-Tex Gas Division Addition 080.73454 37602 393,765 080 190 - Mid-Tex Gas Division Addition 080.73454 38000 14,282 080 190 - Mid-Tex Gas Division Addition 080.73455 37602 566,648 080 190 - Mid-Tex Gas Division Addition 080.73455 38000 21,161 080 190 - Mid-Tex Gas Division Addition 080.73457 37602 1,215,644 080 190 - Mid-Tex Gas Division Addition 080.73457 38000 50,652 080 190 - Mid-Tex Gas Division Addition 080.73460 37602 174,428 080 190 - Mid-Tex Gas Division Addition 080.73460 38000 19,381 080 190 - Mid-Tex Gas Division Addition 080.73462 37602 139,209 080 190 - Mid-Tex Gas Division Addition 080.73462 38000 15,468 080 190 - Mid-Tex Gas Division Addition 080.73463 37602 79 080 190 - Mid-Tex Gas Division Addition 080.73468 37602 33,114 080 190 - Mid-Tex Gas Division Addition 080.73468 38000 2,114 080 190 - Mid-Tex Gas Division Addition 080.73472 38500 27,141 080 190 - Mid-Tex Gas Division Addition 080.73473 37900 2,232 080 190 - Mid-Tex Gas Division Addition 080.73474 37602 658 080 190 - Mid-Tex Gas Division Addition 080.73479 37602 7,210 080 190 - Mid-Tex Gas Division Addition 080.73479 38000 380 080 190 - Mid-Tex Gas Division Addition 080.73480 37602 3,344 080 190 - Mid-Tex Gas Division Addition 080.73481 39906 22,239 080 190 - Mid-Tex Gas Division Addition 080.73485 37602 186 080 190 - Mid-Tex Gas Division Addition 080.73490 37602 (2) 080 190 - Mid-Tex Gas Division Addition 080.73490 38000 (178) 080 190 - Mid-Tex Gas Division Addition 080.73490 38100 (8,301) 080 190 - Mid-Tex Gas Division Addition 080.73490 38500 (57) 080 190 - Mid-Tex Gas Division Addition 080.73493 37601 15,120 080 190 - Mid-Tex Gas Division Addition 080.73493 37602 105,839 080 190 - Mid-Tex Gas Division Addition 080.73493 37800 30,262 080 190 - Mid-Tex Gas Division Addition 080.73494 39400 - 080 190 - Mid-Tex Gas Division Addition 080.73496 37602 1,152 080 190 - Mid-Tex Gas Division Addition 080.73497 37602 397,331 080 190 - Mid-Tex Gas Division Addition 080.73497 38000 139,603 080 190 - Mid-Tex Gas Division Addition 080.73499 37602 80 080 190 - Mid-Tex Gas Division Addition 080.73505 37602 855 080 190 - Mid-Tex Gas Division Addition 080.73506 37602 133 080 190 - Mid-Tex Gas Division Addition 080.73508 37602 12,735 080 190 - Mid-Tex Gas Division Addition 080.73508 38000 3,184 080 190 - Mid-Tex Gas Division Addition 080.73509 37602 4,302 080 190 - Mid-Tex Gas Division Addition 080.73514 37602 824,189 080 190 - Mid-Tex Gas Division Addition 080.73514 38000 43,378 080 190 - Mid-Tex Gas Division Addition 080.73517 37602 979,627 080 190 - Mid-Tex Gas Division Addition 080.73517 38000 442,845 080 190 - Mid-Tex Gas Division Addition 080.73521 37602 (4,389) 080 190 - Mid-Tex Gas Division Addition 080.73521 38000 (1,951) 080 190 - Mid-Tex Gas Division Addition 080.73521 38500 (3,414) 080 190 - Mid-Tex Gas Division Addition 080.73522 37602 12,199 080 190 - Mid-Tex Gas Division Addition 080.73523 37602 34,628 080 190 - Mid-Tex Gas Division Addition 080.73523 38000 2,210 080 190 - Mid-Tex Gas Division Addition 080.73524 37602 48,693 080 190 - Mid-Tex Gas Division Addition 080.73530 37602 39,400 080 190 - Mid-Tex Gas Division Addition 080.73531 37602 69,812 080 190 - Mid-Tex Gas Division Addition 080.73531 38000 7,757 080 190 - Mid-Tex Gas Division Addition 080.73537 37602 210,733 080 190 - Mid-Tex Gas Division Addition 080.73546 37602 - 080 190 - Mid-Tex Gas Division Addition 080.73549 37602 - 080 190 - Mid-Tex Gas Division Addition 080.73550 37602 - 080 190 - Mid-Tex Gas Division Addition 080.73555 37602 (13) 080 190 - Mid-Tex Gas Division Addition 080.73556 37602 - 080 190 - Mid-Tex Gas Division Addition 080.73557 37601 11,033 080 190 - Mid-Tex Gas Division Addition 080.73557 37602 198,591 080 190 - Mid-Tex Gas Division Addition 080.73557 38000 11,033 080 190 - Mid-Tex Gas Division Addition 080.73558 37602 18,010 080 190 - Mid-Tex Gas Division Addition 080.73558 38000 7,719 080 190 - Mid-Tex Gas Division Addition 080.73560 37602 5,343 080 190 - Mid-Tex Gas Division Addition 080.73561 37602 - 080 190 - Mid-Tex Gas Division Addition 080.73562 37602 1,015 080 190 - Mid-Tex Gas Division Addition 080.73574 37602 5,747 080 190 - Mid-Tex Gas Division Addition 080.73574 38000 303 080 190 - Mid-Tex Gas Division Addition 080.73575 37602 412,912 080 190 - Mid-Tex Gas Division Addition 080.73575 38000 109,762 080 190 - Mid-Tex Gas Division Addition 080.73576 37602 8,883 080 190 - Mid-Tex Gas Division Addition 080.73576 38000 90 080 190 - Mid-Tex Gas Division Addition 080.73579 37602 689,335 080 190 - Mid-Tex Gas Division Addition 080.73579 38000 103,004 080 190 - Mid-Tex Gas Division Addition 080.73581 37602 324 080 190 - Mid-Tex Gas Division Addition 080.73581 37800 755 080 190 - Mid-Tex Gas Division Addition 080.73585 37602 - MTX Additions by FERC Page 72 of 101 470 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.73586 37602 4,813 080 190 - Mid-Tex Gas Division Addition 080.73586 38000 253 080 190 - Mid-Tex Gas Division Addition 080.73587 37602 316,717 080 190 - Mid-Tex Gas Division Addition 080.73587 38000 123,168 080 190 - Mid-Tex Gas Division Addition 080.73589 37602 1,254 080 190 - Mid-Tex Gas Division Addition 080.73589 38000 66 080 190 - Mid-Tex Gas Division Addition 080.73591 37602 872 080 190 - Mid-Tex Gas Division Addition 080.73592 37602 248,330 080 190 - Mid-Tex Gas Division Addition 080.73592 38000 70,042 080 190 - Mid-Tex Gas Division Addition 080.73593 37602 55,573 080 190 - Mid-Tex Gas Division Addition 080.73593 38000 13,893 080 190 - Mid-Tex Gas Division Addition 080.73596 37601 (43,324) 080 190 - Mid-Tex Gas Division Addition 080.73601 37602 (11,209) 080 190 - Mid-Tex Gas Division Addition 080.73601 38000 (1,978) 080 190 - Mid-Tex Gas Division Addition 080.73602 38000 20,896 080 190 - Mid-Tex Gas Division Addition 080.73605 38000 67,869 080 190 - Mid-Tex Gas Division Addition 080.73614 37602 14,504 080 190 - Mid-Tex Gas Division Addition 080.73614 38000 510 080 190 - Mid-Tex Gas Division Addition 080.73616 38000 26,015 080 190 - Mid-Tex Gas Division Addition 080.73618 37602 29,703 080 190 - Mid-Tex Gas Division Addition 080.73618 38000 3,300 080 190 - Mid-Tex Gas Division Addition 080.73620 38000 18,273 080 190 - Mid-Tex Gas Division Addition 080.73625 37602 27,392 080 190 - Mid-Tex Gas Division Addition 080.73626 37602 432,976 080 190 - Mid-Tex Gas Division Addition 080.73626 38000 22,788 080 190 - Mid-Tex Gas Division Addition 080.73629 37602 922 080 190 - Mid-Tex Gas Division Addition 080.73634 37602 1,879 080 190 - Mid-Tex Gas Division Addition 080.73635 39400 - 080 190 - Mid-Tex Gas Division Addition 080.73639 37602 214 080 190 - Mid-Tex Gas Division Addition 080.73641 37602 1,869 080 190 - Mid-Tex Gas Division Addition 080.73641 38000 1,246 080 190 - Mid-Tex Gas Division Addition 080.73644 37602 8,196 080 190 - Mid-Tex Gas Division Addition 080.73644 38000 431 080 190 - Mid-Tex Gas Division Addition 080.73645 37602 4,709 080 190 - Mid-Tex Gas Division Addition 080.73651 37800 711 080 190 - Mid-Tex Gas Division Addition 080.73654 37601 - 080 190 - Mid-Tex Gas Division Addition 080.73654 37602 34,285 080 190 - Mid-Tex Gas Division Addition 080.73655 37602 819,817 080 190 - Mid-Tex Gas Division Addition 080.73655 38000 91,091 080 190 - Mid-Tex Gas Division Addition 080.73656 39400 - 080 190 - Mid-Tex Gas Division Addition 080.73657 37602 525,955 080 190 - Mid-Tex Gas Division Addition 080.73657 38000 58,439 080 190 - Mid-Tex Gas Division Addition 080.73662 37602 112,365 080 190 - Mid-Tex Gas Division Addition 080.73663 37602 149,310 080 190 - Mid-Tex Gas Division Addition 080.73664 37601 264 080 190 - Mid-Tex Gas Division Addition 080.73664 37602 1,322 080 190 - Mid-Tex Gas Division Addition 080.73664 37800 11,633 080 190 - Mid-Tex Gas Division Addition 080.73665 37602 9,285 080 190 - Mid-Tex Gas Division Addition 080.73666 37602 29,192 080 190 - Mid-Tex Gas Division Addition 080.73669 37602 1,064 080 190 - Mid-Tex Gas Division Addition 080.73671 37602 349,640 080 190 - Mid-Tex Gas Division Addition 080.73671 38000 87,410 080 190 - Mid-Tex Gas Division Addition 080.73672 37602 180,157 080 190 - Mid-Tex Gas Division Addition 080.73672 38000 20,017 080 190 - Mid-Tex Gas Division Addition 080.73673 37602 5,757 080 190 - Mid-Tex Gas Division Addition 080.73678 37602 306,740 080 190 - Mid-Tex Gas Division Addition 080.73678 38000 9,487 080 190 - Mid-Tex Gas Division Addition 080.73689 37602 21,529 080 190 - Mid-Tex Gas Division Addition 080.73689 38000 1,133 080 190 - Mid-Tex Gas Division Addition 080.73692 39000 - 080 190 - Mid-Tex Gas Division Addition 080.73694 37601 467 080 190 - Mid-Tex Gas Division Addition 080.73694 37602 1,336 080 190 - Mid-Tex Gas Division Addition 080.73694 37800 1,312 080 190 - Mid-Tex Gas Division Addition 080.73695 37602 - 080 190 - Mid-Tex Gas Division Addition 080.73696 39000 1 080 190 - Mid-Tex Gas Division Addition 080.73697 39000 - 080 190 - Mid-Tex Gas Division Addition 080.73698 39000 - 080 190 - Mid-Tex Gas Division Addition 080.73701 37602 462,318 080 190 - Mid-Tex Gas Division Addition 080.73701 38000 308,212 080 190 - Mid-Tex Gas Division Addition 080.73703 37602 149,208 080 190 - Mid-Tex Gas Division Addition 080.73703 38000 11,231 080 190 - Mid-Tex Gas Division Addition 080.73706 37602 15 080 190 - Mid-Tex Gas Division Addition 080.73710 37602 2,913 080 190 - Mid-Tex Gas Division Addition 080.73711 37602 (12,872) 080 190 - Mid-Tex Gas Division Addition 080.73714 39400 - 080 190 - Mid-Tex Gas Division Addition 080.73715 37602 676 080 190 - Mid-Tex Gas Division Addition 080.73715 38000 (231) 080 190 - Mid-Tex Gas Division Addition 080.73716 37602 18,280 080 190 - Mid-Tex Gas Division Addition 080.73718 37602 5,777 080 190 - Mid-Tex Gas Division Addition 080.73720 37602 11,640 080 190 - Mid-Tex Gas Division Addition 080.73720 38000 4,989 080 190 - Mid-Tex Gas Division Addition 080.73721 37602 (14,865) 080 190 - Mid-Tex Gas Division Addition 080.73721 37800 - 080 190 - Mid-Tex Gas Division Addition 080.73721 38000 - 080 190 - Mid-Tex Gas Division Addition 080.73728 37602 84 080 190 - Mid-Tex Gas Division Addition 080.73729 37602 4,768 080 190 - Mid-Tex Gas Division Addition 080.73729 38000 2,568 080 190 - Mid-Tex Gas Division Addition 080.73730 37602 7,620 080 190 - Mid-Tex Gas Division Addition 080.73730 38000 953 080 190 - Mid-Tex Gas Division Addition 080.73732 37602 5,763 080 190 - Mid-Tex Gas Division Addition 080.73732 38000 303 080 190 - Mid-Tex Gas Division Addition 080.73733 37602 (22) 080 190 - Mid-Tex Gas Division Addition 080.73735 38000 20,780 080 190 - Mid-Tex Gas Division Addition 080.73735 38500 5,398 080 190 - Mid-Tex Gas Division Addition 080.73736 37602 (3) 080 190 - Mid-Tex Gas Division Addition 080.73739 38000 6,681 080 190 - Mid-Tex Gas Division Addition 080.73739 38100 4,635 080 190 - Mid-Tex Gas Division Addition 080.73741 37602 13,409 080 190 - Mid-Tex Gas Division Addition 080.73745 37602 753,882 080 190 - Mid-Tex Gas Division Addition 080.73745 38000 251,294 080 190 - Mid-Tex Gas Division Addition 080.73748 37602 820,097 080 190 - Mid-Tex Gas Division Addition 080.73749 37602 (17,622) 080 190 - Mid-Tex Gas Division Addition 080.73749 37800 (4,322) 080 190 - Mid-Tex Gas Division Addition 080.73749 38000 (4,821) 080 190 - Mid-Tex Gas Division Addition 080.73750 37602 2,275 080 190 - Mid-Tex Gas Division Addition 080.73751 37602 439,842 080 190 - Mid-Tex Gas Division Addition 080.73753 37602 846,683 MTX Additions by FERC Page 73 of 101 471 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.73753 38000 149,415 080 190 - Mid-Tex Gas Division Addition 080.73755 37602 380,659 080 190 - Mid-Tex Gas Division Addition 080.73755 38000 133,745 080 190 - Mid-Tex Gas Division Addition 080.73756 37602 10,197 080 190 - Mid-Tex Gas Division Addition 080.73757 37602 (162) 080 190 - Mid-Tex Gas Division Addition 080.73758 37602 2,983 080 190 - Mid-Tex Gas Division Addition 080.73759 37602 14,654 080 190 - Mid-Tex Gas Division Addition 080.73761 37602 522,529 080 190 - Mid-Tex Gas Division Addition 080.73761 38000 27,502 080 190 - Mid-Tex Gas Division Addition 080.73763 37602 (2) 080 190 - Mid-Tex Gas Division Addition 080.73765 37602 16,005 080 190 - Mid-Tex Gas Division Addition 080.73766 37602 18,314 080 190 - Mid-Tex Gas Division Addition 080.73766 38000 - 080 190 - Mid-Tex Gas Division Addition 080.73768 37602 90,363 080 190 - Mid-Tex Gas Division Addition 080.73769 37602 18,709 080 190 - Mid-Tex Gas Division Addition 080.73770 37602 76,099 080 190 - Mid-Tex Gas Division Addition 080.73771 37602 499,108 080 190 - Mid-Tex Gas Division Addition 080.73773 37602 36,094 080 190 - Mid-Tex Gas Division Addition 080.73773 38000 6,621 080 190 - Mid-Tex Gas Division Addition 080.73774 37602 5,999 080 190 - Mid-Tex Gas Division Addition 080.73775 37602 81,496 080 190 - Mid-Tex Gas Division Addition 080.73776 37602 5,670 080 190 - Mid-Tex Gas Division Addition 080.73776 38000 493 080 190 - Mid-Tex Gas Division Addition 080.73777 37602 33,046 080 190 - Mid-Tex Gas Division Addition 080.73784 37602 4,134 080 190 - Mid-Tex Gas Division Addition 080.73784 38000 42 080 190 - Mid-Tex Gas Division Addition 080.73786 37602 630 080 190 - Mid-Tex Gas Division Addition 080.73787 37602 1,550 080 190 - Mid-Tex Gas Division Addition 080.73787 38000 172 080 190 - Mid-Tex Gas Division Addition 080.73793 37602 415,212 080 190 - Mid-Tex Gas Division Addition 080.73793 38000 46,135 080 190 - Mid-Tex Gas Division Addition 080.73797 37602 563 080 190 - Mid-Tex Gas Division Addition 080.73801 37602 360 080 190 - Mid-Tex Gas Division Addition 080.73803 37602 12,136 080 190 - Mid-Tex Gas Division Addition 080.73803 37800 1,348 080 190 - Mid-Tex Gas Division Addition 080.73806 37602 6,753 080 190 - Mid-Tex Gas Division Addition 080.73806 37800 6,753 080 190 - Mid-Tex Gas Division Addition 080.73807 37602 14,309 080 190 - Mid-Tex Gas Division Addition 080.73807 37800 753 080 190 - Mid-Tex Gas Division Addition 080.73809 37602 7,527 080 190 - Mid-Tex Gas Division Addition 080.73809 37800 3,226 080 190 - Mid-Tex Gas Division Addition 080.73810 37602 396,543 080 190 - Mid-Tex Gas Division Addition 080.73810 38000 132,181 080 190 - Mid-Tex Gas Division Addition 080.73814 37602 3,487 080 190 - Mid-Tex Gas Division Addition 080.73817 37602 26,230 080 190 - Mid-Tex Gas Division Addition 080.73817 38000 2,594 080 190 - Mid-Tex Gas Division Addition 080.73818 37601 51,004 080 190 - Mid-Tex Gas Division Addition 080.73818 37602 5,049,442 080 190 - Mid-Tex Gas Division Addition 080.73822 37602 26,685 080 190 - Mid-Tex Gas Division Addition 080.73822 38000 62,265 080 190 - Mid-Tex Gas Division Addition 080.73823 37602 59,070 080 190 - Mid-Tex Gas Division Addition 080.73826 37602 718 080 190 - Mid-Tex Gas Division Addition 080.73828 37602 14,856 080 190 - Mid-Tex Gas Division Addition 080.73829 39000 (267,397) 080 190 - Mid-Tex Gas Division Addition 080.73831 37602 15,727 080 190 - Mid-Tex Gas Division Addition 080.73834 37602 1,140 080 190 - Mid-Tex Gas Division Addition 080.73835 37602 2,673 080 190 - Mid-Tex Gas Division Addition 080.73835 38000 41 080 190 - Mid-Tex Gas Division Addition 080.73836 37602 - 080 190 - Mid-Tex Gas Division Addition 080.73837 37602 48,650 080 190 - Mid-Tex Gas Division Addition 080.73837 38000 8,585 080 190 - Mid-Tex Gas Division Addition 080.73838 37602 52,720 080 190 - Mid-Tex Gas Division Addition 080.73838 38000 7,189 080 190 - Mid-Tex Gas Division Addition 080.73839 37602 473,346 080 190 - Mid-Tex Gas Division Addition 080.73839 38000 52,594 080 190 - Mid-Tex Gas Division Addition 080.73840 37602 464,015 080 190 - Mid-Tex Gas Division Addition 080.73840 38000 29,618 080 190 - Mid-Tex Gas Division Addition 080.73841 37602 489,519 080 190 - Mid-Tex Gas Division Addition 080.73841 38000 54,391 080 190 - Mid-Tex Gas Division Addition 080.73842 37602 232,832 080 190 - Mid-Tex Gas Division Addition 080.73842 38000 12,254 080 190 - Mid-Tex Gas Division Addition 080.73845 37602 170,437 080 190 - Mid-Tex Gas Division Addition 080.73845 38000 18,938 080 190 - Mid-Tex Gas Division Addition 080.73846 37602 357,702 080 190 - Mid-Tex Gas Division Addition 080.73846 38000 89,425 080 190 - Mid-Tex Gas Division Addition 080.73847 37602 261,950 080 190 - Mid-Tex Gas Division Addition 080.73847 38000 29,106 080 190 - Mid-Tex Gas Division Addition 080.73848 37602 221,657 080 190 - Mid-Tex Gas Division Addition 080.73848 38000 147,771 080 190 - Mid-Tex Gas Division Addition 080.73849 37602 276,387 080 190 - Mid-Tex Gas Division Addition 080.73849 38000 30,710 080 190 - Mid-Tex Gas Division Addition 080.73850 37602 3,936 080 190 - Mid-Tex Gas Division Addition 080.73850 37800 5,093 080 190 - Mid-Tex Gas Division Addition 080.73850 38000 232 080 190 - Mid-Tex Gas Division Addition 080.73852 37602 2,865 080 190 - Mid-Tex Gas Division Addition 080.73853 37602 976 080 190 - Mid-Tex Gas Division Addition 080.73855 37602 156,728 080 190 - Mid-Tex Gas Division Addition 080.73856 37602 161,481 080 190 - Mid-Tex Gas Division Addition 080.73857 37602 - 080 190 - Mid-Tex Gas Division Addition 080.73859 37602 216,096 080 190 - Mid-Tex Gas Division Addition 080.73859 38000 126,914 080 190 - Mid-Tex Gas Division Addition 080.73864 37601 478,639 080 190 - Mid-Tex Gas Division Addition 080.73865 37602 435,142 080 190 - Mid-Tex Gas Division Addition 080.73865 38000 95,519 080 190 - Mid-Tex Gas Division Addition 080.73869 37602 13,743 080 190 - Mid-Tex Gas Division Addition 080.73871 37602 1,985 080 190 - Mid-Tex Gas Division Addition 080.73872 37602 39,697 080 190 - Mid-Tex Gas Division Addition 080.73872 37800 59,546 080 190 - Mid-Tex Gas Division Addition 080.73873 39000 - 080 190 - Mid-Tex Gas Division Addition 080.73876 37602 (7,360) 080 190 - Mid-Tex Gas Division Addition 080.73877 38000 2,446 080 190 - Mid-Tex Gas Division Addition 080.73883 37602 187,990 080 190 - Mid-Tex Gas Division Addition 080.73883 38000 80,567 080 190 - Mid-Tex Gas Division Addition 080.73884 37602 5,668 080 190 - Mid-Tex Gas Division Addition 080.73885 37602 37,775 080 190 - Mid-Tex Gas Division Addition 080.73885 38000 4,197 080 190 - Mid-Tex Gas Division Addition 080.73886 38000 41,119 MTX Additions by FERC Page 74 of 101 472 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.73886 38100 19 080 190 - Mid-Tex Gas Division Addition 080.73886 38500 (4) 080 190 - Mid-Tex Gas Division Addition 080.73887 37602 - 080 190 - Mid-Tex Gas Division Addition 080.73890 37602 3,287 080 190 - Mid-Tex Gas Division Addition 080.73890 38000 365 080 190 - Mid-Tex Gas Division Addition 080.73892 37602 286,080 080 190 - Mid-Tex Gas Division Addition 080.73892 38000 122,606 080 190 - Mid-Tex Gas Division Addition 080.73893 37602 4,320 080 190 - Mid-Tex Gas Division Addition 080.73893 38000 1,440 080 190 - Mid-Tex Gas Division Addition 080.73895 37602 510,975 080 190 - Mid-Tex Gas Division Addition 080.73895 38000 179,532 080 190 - Mid-Tex Gas Division Addition 080.73896 37602 138,343 080 190 - Mid-Tex Gas Division Addition 080.73896 38000 7,281 080 190 - Mid-Tex Gas Division Addition 080.73897 37602 3,392 080 190 - Mid-Tex Gas Division Addition 080.73897 38000 509 080 190 - Mid-Tex Gas Division Addition 080.73900 37602 22,688 080 190 - Mid-Tex Gas Division Addition 080.73900 37800 7,554 080 190 - Mid-Tex Gas Division Addition 080.73900 38000 15,254 080 190 - Mid-Tex Gas Division Addition 080.73900 38100 5,031 080 190 - Mid-Tex Gas Division Addition 080.73903 37602 366,177 080 190 - Mid-Tex Gas Division Addition 080.73903 38000 156,933 080 190 - Mid-Tex Gas Division Addition 080.73908 37602 24,215 080 190 - Mid-Tex Gas Division Addition 080.73908 38000 4,273 080 190 - Mid-Tex Gas Division Addition 080.73914 37602 3,389 080 190 - Mid-Tex Gas Division Addition 080.73914 37800 13,555 080 190 - Mid-Tex Gas Division Addition 080.73915 37602 3 080 190 - Mid-Tex Gas Division Addition 080.73916 37602 1,455 080 190 - Mid-Tex Gas Division Addition 080.73916 38000 162 080 190 - Mid-Tex Gas Division Addition 080.73929 37602 93,805 080 190 - Mid-Tex Gas Division Addition 080.73933 37602 - 080 190 - Mid-Tex Gas Division Addition 080.73934 37602 633,776 080 190 - Mid-Tex Gas Division Addition 080.73938 37602 2,995 080 190 - Mid-Tex Gas Division Addition 080.73938 38000 93 080 190 - Mid-Tex Gas Division Addition 080.73941 37602 380,353 080 190 - Mid-Tex Gas Division Addition 080.73941 38000 204,806 080 190 - Mid-Tex Gas Division Addition 080.73942 37602 432 080 190 - Mid-Tex Gas Division Addition 080.73948 38000 1,654 080 190 - Mid-Tex Gas Division Addition 080.73950 37601 132,106 080 190 - Mid-Tex Gas Division Addition 080.73952 37602 10,609 080 190 - Mid-Tex Gas Division Addition 080.73952 38000 1,179 080 190 - Mid-Tex Gas Division Addition 080.73953 37602 1,320 080 190 - Mid-Tex Gas Division Addition 080.73954 37602 862 080 190 - Mid-Tex Gas Division Addition 080.73955 37602 (35,861) 080 190 - Mid-Tex Gas Division Addition 080.73957 37602 48 080 190 - Mid-Tex Gas Division Addition 080.73959 37602 52,880 080 190 - Mid-Tex Gas Division Addition 080.73959 38000 9,332 080 190 - Mid-Tex Gas Division Addition 080.73965 37602 476,583 080 190 - Mid-Tex Gas Division Addition 080.73965 38000 125,103 080 190 - Mid-Tex Gas Division Addition 080.73967 37602 390,702 080 190 - Mid-Tex Gas Division Addition 080.73969 37602 (38) 080 190 - Mid-Tex Gas Division Addition 080.73971 37602 169 080 190 - Mid-Tex Gas Division Addition 080.73972 37602 320,778 080 190 - Mid-Tex Gas Division Addition 080.73972 38000 56,608 080 190 - Mid-Tex Gas Division Addition 080.73973 37800 10,696 080 190 - Mid-Tex Gas Division Addition 080.73973 38000 60,612 080 190 - Mid-Tex Gas Division Addition 080.73977 37602 23,945 080 190 - Mid-Tex Gas Division Addition 080.73978 37800 76 080 190 - Mid-Tex Gas Division Addition 080.73979 37602 28,791 080 190 - Mid-Tex Gas Division Addition 080.73983 37602 433,632 080 190 - Mid-Tex Gas Division Addition 080.73983 38000 108,408 080 190 - Mid-Tex Gas Division Addition 080.73984 37602 159,725 080 190 - Mid-Tex Gas Division Addition 080.73988 37602 380,414 080 190 - Mid-Tex Gas Division Addition 080.73988 38000 163,035 080 190 - Mid-Tex Gas Division Addition 080.73991 37602 19,675 080 190 - Mid-Tex Gas Division Addition 080.73994 37602 366,784 080 190 - Mid-Tex Gas Division Addition 080.73994 38000 64,727 080 190 - Mid-Tex Gas Division Addition 080.73997 37602 14,170 080 190 - Mid-Tex Gas Division Addition 080.74000 37602 192,565 080 190 - Mid-Tex Gas Division Addition 080.74000 38000 21,396 080 190 - Mid-Tex Gas Division Addition 080.74002 37602 17,177 080 190 - Mid-Tex Gas Division Addition 080.74002 38000 (809) 080 190 - Mid-Tex Gas Division Addition 080.74003 37602 855,508 080 190 - Mid-Tex Gas Division Addition 080.74003 38000 95,057 080 190 - Mid-Tex Gas Division Addition 080.74004 37602 52 080 190 - Mid-Tex Gas Division Addition 080.74005 37602 681 080 190 - Mid-Tex Gas Division Addition 080.74005 38000 36 080 190 - Mid-Tex Gas Division Addition 080.74007 37602 (12) 080 190 - Mid-Tex Gas Division Addition 080.74008 37602 13,798 080 190 - Mid-Tex Gas Division Addition 080.74009 37602 422,080 080 190 - Mid-Tex Gas Division Addition 080.74009 38000 46,898 080 190 - Mid-Tex Gas Division Addition 080.74011 37602 557,771 080 190 - Mid-Tex Gas Division Addition 080.74011 38000 287,336 080 190 - Mid-Tex Gas Division Addition 080.74015 37602 9,652 080 190 - Mid-Tex Gas Division Addition 080.74017 37601 119,716 080 190 - Mid-Tex Gas Division Addition 080.74017 37602 489,854 080 190 - Mid-Tex Gas Division Addition 080.74017 38000 34,370 080 190 - Mid-Tex Gas Division Addition 080.74021 37602 1,214 080 190 - Mid-Tex Gas Division Addition 080.74022 37602 (92,873) 080 190 - Mid-Tex Gas Division Addition 080.74022 38000 (4,882) 080 190 - Mid-Tex Gas Division Addition 080.74027 37602 15,948 080 190 - Mid-Tex Gas Division Addition 080.74027 38000 1,772 080 190 - Mid-Tex Gas Division Addition 080.74028 37602 194,894 080 190 - Mid-Tex Gas Division Addition 080.74028 38000 21,655 080 190 - Mid-Tex Gas Division Addition 080.74031 37602 114,107 080 190 - Mid-Tex Gas Division Addition 080.74031 38000 28,527 080 190 - Mid-Tex Gas Division Addition 080.74032 37602 122,780 080 190 - Mid-Tex Gas Division Addition 080.74032 38000 6,462 080 190 - Mid-Tex Gas Division Addition 080.74038 37602 247,941 080 190 - Mid-Tex Gas Division Addition 080.74038 37800 202,861 080 190 - Mid-Tex Gas Division Addition 080.74039 37602 98,014 080 190 - Mid-Tex Gas Division Addition 080.74039 38000 42,006 080 190 - Mid-Tex Gas Division Addition 080.74040 37602 73,236 080 190 - Mid-Tex Gas Division Addition 080.74040 38000 73,236 080 190 - Mid-Tex Gas Division Addition 080.74041 37602 158,993 080 190 - Mid-Tex Gas Division Addition 080.74041 38000 105,995 080 190 - Mid-Tex Gas Division Addition 080.74042 37602 6,666 080 190 - Mid-Tex Gas Division Addition 080.74046 37602 - MTX Additions by FERC Page 75 of 101 473 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.74047 37601 (3,266) 080 190 - Mid-Tex Gas Division Addition 080.74047 37602 (8,166) 080 190 - Mid-Tex Gas Division Addition 080.74047 37800 (4,900) 080 190 - Mid-Tex Gas Division Addition 080.74048 37602 589,782 080 190 - Mid-Tex Gas Division Addition 080.74048 38000 65,531 080 190 - Mid-Tex Gas Division Addition 080.74049 37602 222,342 080 190 - Mid-Tex Gas Division Addition 080.74050 37602 162,742 080 190 - Mid-Tex Gas Division Addition 080.74054 37602 391,354 080 190 - Mid-Tex Gas Division Addition 080.74054 38000 69,062 080 190 - Mid-Tex Gas Division Addition 080.74060 37601 16,961 080 190 - Mid-Tex Gas Division Addition 080.74060 37602 1,212 080 190 - Mid-Tex Gas Division Addition 080.74060 37800 6,058 080 190 - Mid-Tex Gas Division Addition 080.74063 37602 170,289 080 190 - Mid-Tex Gas Division Addition 080.74073 37602 2,384 080 190 - Mid-Tex Gas Division Addition 080.74074 37602 144,737 080 190 - Mid-Tex Gas Division Addition 080.74076 37602 770 080 190 - Mid-Tex Gas Division Addition 080.74078 38000 4,193 080 190 - Mid-Tex Gas Division Addition 080.74079 37602 5,853 080 190 - Mid-Tex Gas Division Addition 080.74079 38000 650 080 190 - Mid-Tex Gas Division Addition 080.74080 37602 - 080 190 - Mid-Tex Gas Division Addition 080.74086 37602 385,668 080 190 - Mid-Tex Gas Division Addition 080.74087 37602 356,536 080 190 - Mid-Tex Gas Division Addition 080.74087 38000 83,632 080 190 - Mid-Tex Gas Division Addition 080.74089 37601 1,097 080 190 - Mid-Tex Gas Division Addition 080.74096 37602 159 080 190 - Mid-Tex Gas Division Addition 080.74098 37602 236,544 080 190 - Mid-Tex Gas Division Addition 080.74098 38000 78,848 080 190 - Mid-Tex Gas Division Addition 080.74100 37602 (40) 080 190 - Mid-Tex Gas Division Addition 080.74101 37602 890 080 190 - Mid-Tex Gas Division Addition 080.74103 37602 6,628 080 190 - Mid-Tex Gas Division Addition 080.74108 37602 80 080 190 - Mid-Tex Gas Division Addition 080.74111 37602 204,558 080 190 - Mid-Tex Gas Division Addition 080.74114 37602 640,579 080 190 - Mid-Tex Gas Division Addition 080.74119 37602 933,607 080 190 - Mid-Tex Gas Division Addition 080.74119 38000 164,754 080 190 - Mid-Tex Gas Division Addition 080.74121 37602 1,008,092 080 190 - Mid-Tex Gas Division Addition 080.74121 38000 474,396 080 190 - Mid-Tex Gas Division Addition 080.74122 37602 37,415 080 190 - Mid-Tex Gas Division Addition 080.74122 38000 5,591 080 190 - Mid-Tex Gas Division Addition 080.74123 38000 17,277 080 190 - Mid-Tex Gas Division Addition 080.74127 37602 172,971 080 190 - Mid-Tex Gas Division Addition 080.74128 37602 109,911 080 190 - Mid-Tex Gas Division Addition 080.74130 37602 1,611 080 190 - Mid-Tex Gas Division Addition 080.74130 38000 179 080 190 - Mid-Tex Gas Division Addition 080.74136 37602 2,869 080 190 - Mid-Tex Gas Division Addition 080.74136 38000 506 080 190 - Mid-Tex Gas Division Addition 080.74137 37602 572,718 080 190 - Mid-Tex Gas Division Addition 080.74137 38000 245,451 080 190 - Mid-Tex Gas Division Addition 080.74140 37602 95,523 080 190 - Mid-Tex Gas Division Addition 080.74140 38000 38,825 080 190 - Mid-Tex Gas Division Addition 080.74144 37602 443,826 080 190 - Mid-Tex Gas Division Addition 080.74147 37602 65,417 080 190 - Mid-Tex Gas Division Addition 080.74149 37602 159,954 080 190 - Mid-Tex Gas Division Addition 080.74150 37602 105,500 080 190 - Mid-Tex Gas Division Addition 080.74155 37602 (36) 080 190 - Mid-Tex Gas Division Addition 080.74158 37602 12,507 080 190 - Mid-Tex Gas Division Addition 080.74159 37602 989,799 080 190 - Mid-Tex Gas Division Addition 080.74159 38000 202,730 080 190 - Mid-Tex Gas Division Addition 080.74160 37602 82,714 080 190 - Mid-Tex Gas Division Addition 080.74161 37602 638 080 190 - Mid-Tex Gas Division Addition 080.74162 37602 2,838 080 190 - Mid-Tex Gas Division Addition 080.74163 37602 535 080 190 - Mid-Tex Gas Division Addition 080.74164 37602 1,431 080 190 - Mid-Tex Gas Division Addition 080.74165 37602 4,016 080 190 - Mid-Tex Gas Division Addition 080.74169 37602 96,409 080 190 - Mid-Tex Gas Division Addition 080.74170 37602 1,837 080 190 - Mid-Tex Gas Division Addition 080.74171 37602 154,975 080 190 - Mid-Tex Gas Division Addition 080.74173 37602 18,707 080 190 - Mid-Tex Gas Division Addition 080.74174 37602 267,118 080 190 - Mid-Tex Gas Division Addition 080.74174 38000 114,479 080 190 - Mid-Tex Gas Division Addition 080.74176 37602 13,278 080 190 - Mid-Tex Gas Division Addition 080.74184 37602 284,482 080 190 - Mid-Tex Gas Division Addition 080.74184 38000 14,973 080 190 - Mid-Tex Gas Division Addition 080.74186 37601 - 080 190 - Mid-Tex Gas Division Addition 080.74186 37602 7,461 080 190 - Mid-Tex Gas Division Addition 080.74188 37602 1,213,695 080 190 - Mid-Tex Gas Division Addition 080.74188 38000 134,855 080 190 - Mid-Tex Gas Division Addition 080.74200 37602 347,928 080 190 - Mid-Tex Gas Division Addition 080.74202 37602 107,389 080 190 - Mid-Tex Gas Division Addition 080.74204 37602 4,207 080 190 - Mid-Tex Gas Division Addition 080.74208 37602 4,587 080 190 - Mid-Tex Gas Division Addition 080.74208 38000 511 080 190 - Mid-Tex Gas Division Addition 080.74210 37602 907 080 190 - Mid-Tex Gas Division Addition 080.74215 37602 49,236 080 190 - Mid-Tex Gas Division Addition 080.74215 38100 447 080 190 - Mid-Tex Gas Division Addition 080.74215 38300 23 080 190 - Mid-Tex Gas Division Addition 080.74216 37602 220,306 080 190 - Mid-Tex Gas Division Addition 080.74217 37602 782 080 190 - Mid-Tex Gas Division Addition 080.74218 37602 7,599 080 190 - Mid-Tex Gas Division Addition 080.74218 38000 400 080 190 - Mid-Tex Gas Division Addition 080.74219 37602 2,363 080 190 - Mid-Tex Gas Division Addition 080.74225 37602 4,902 080 190 - Mid-Tex Gas Division Addition 080.74229 37602 137,503 080 190 - Mid-Tex Gas Division Addition 080.74233 37602 22,843 080 190 - Mid-Tex Gas Division Addition 080.74241 37602 287,112 080 190 - Mid-Tex Gas Division Addition 080.74242 37602 344,997 080 190 - Mid-Tex Gas Division Addition 080.74249 37602 214,081 080 190 - Mid-Tex Gas Division Addition 080.74250 37602 629,602 080 190 - Mid-Tex Gas Division Addition 080.74254 37602 239,465 080 190 - Mid-Tex Gas Division Addition 080.74257 37602 475,128 080 190 - Mid-Tex Gas Division Addition 080.74257 38000 52,792 080 190 - Mid-Tex Gas Division Addition 080.74258 37602 47,454 080 190 - Mid-Tex Gas Division Addition 080.74259 37602 97,951 080 190 - Mid-Tex Gas Division Addition 080.74259 37800 26,120 080 190 - Mid-Tex Gas Division Addition 080.74259 38000 6,530 080 190 - Mid-Tex Gas Division Addition 080.74260 37602 585,152 080 190 - Mid-Tex Gas Division Addition 080.74260 38000 65,017 MTX Additions by FERC Page 76 of 101 474 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.74261 37800 637 080 190 - Mid-Tex Gas Division Addition 080.74264 37602 191,525 080 190 - Mid-Tex Gas Division Addition 080.74266 37602 316,381 080 190 - Mid-Tex Gas Division Addition 080.74266 38000 43,143 080 190 - Mid-Tex Gas Division Addition 080.74272 37602 2,075 080 190 - Mid-Tex Gas Division Addition 080.74273 37602 84,798 080 190 - Mid-Tex Gas Division Addition 080.74278 37602 3,373,268 080 190 - Mid-Tex Gas Division Addition 080.74281 37602 2,712 080 190 - Mid-Tex Gas Division Addition 080.74281 38000 143 080 190 - Mid-Tex Gas Division Addition 080.74283 37800 189,080 080 190 - Mid-Tex Gas Division Addition 080.74285 37601 (0) 080 190 - Mid-Tex Gas Division Addition 080.74285 37602 91,789 080 190 - Mid-Tex Gas Division Addition 080.74287 37602 91,560 080 190 - Mid-Tex Gas Division Addition 080.74288 37602 53,831 080 190 - Mid-Tex Gas Division Addition 080.74290 37602 17,491 080 190 - Mid-Tex Gas Division Addition 080.74295 37602 1,000,328 080 190 - Mid-Tex Gas Division Addition 080.74299 37602 1,031,978 080 190 - Mid-Tex Gas Division Addition 080.74299 38000 257,995 080 190 - Mid-Tex Gas Division Addition 080.74305 37602 334,492 080 190 - Mid-Tex Gas Division Addition 080.74305 38000 59,028 080 190 - Mid-Tex Gas Division Addition 080.74308 37602 2,492 080 190 - Mid-Tex Gas Division Addition 080.74308 37800 1,150 080 190 - Mid-Tex Gas Division Addition 080.74308 38000 192 080 190 - Mid-Tex Gas Division Addition 080.74309 37602 4,382 080 190 - Mid-Tex Gas Division Addition 080.74309 37800 2,921 080 190 - Mid-Tex Gas Division Addition 080.74310 37602 344 080 190 - Mid-Tex Gas Division Addition 080.74310 37800 310 080 190 - Mid-Tex Gas Division Addition 080.74310 38000 34 080 190 - Mid-Tex Gas Division Addition 080.74311 37602 3,453 080 190 - Mid-Tex Gas Division Addition 080.74311 37800 5,179 080 190 - Mid-Tex Gas Division Addition 080.74312 37602 1,578 080 190 - Mid-Tex Gas Division Addition 080.74312 37800 1,291 080 190 - Mid-Tex Gas Division Addition 080.74313 37602 450,112 080 190 - Mid-Tex Gas Division Addition 080.74313 38000 450,112 080 190 - Mid-Tex Gas Division Addition 080.74315 37602 7,237 080 190 - Mid-Tex Gas Division Addition 080.74315 37800 224 080 190 - Mid-Tex Gas Division Addition 080.74318 37602 6,166 080 190 - Mid-Tex Gas Division Addition 080.74318 37800 9,250 080 190 - Mid-Tex Gas Division Addition 080.74320 37602 38,387 080 190 - Mid-Tex Gas Division Addition 080.74320 37800 52,783 080 190 - Mid-Tex Gas Division Addition 080.74320 38000 4,798 080 190 - Mid-Tex Gas Division Addition 080.74321 37602 551,675 080 190 - Mid-Tex Gas Division Addition 080.74326 37602 177,093 080 190 - Mid-Tex Gas Division Addition 080.74328 37602 1,540 080 190 - Mid-Tex Gas Division Addition 080.74335 37602 353,948 080 190 - Mid-Tex Gas Division Addition 080.74335 38000 52,889 080 190 - Mid-Tex Gas Division Addition 080.74339 37602 66 080 190 - Mid-Tex Gas Division Addition 080.74340 37602 13,247 080 190 - Mid-Tex Gas Division Addition 080.74340 38000 2,338 080 190 - Mid-Tex Gas Division Addition 080.74341 37602 263,093 080 190 - Mid-Tex Gas Division Addition 080.74341 38000 83,082 080 190 - Mid-Tex Gas Division Addition 080.74343 37602 431,929 080 190 - Mid-Tex Gas Division Addition 080.74343 38000 143,976 080 190 - Mid-Tex Gas Division Addition 080.74344 37602 522,167 080 190 - Mid-Tex Gas Division Addition 080.74344 38000 130,542 080 190 - Mid-Tex Gas Division Addition 080.74345 37602 503,087 080 190 - Mid-Tex Gas Division Addition 080.74345 38000 167,696 080 190 - Mid-Tex Gas Division Addition 080.74346 37602 358,645 080 190 - Mid-Tex Gas Division Addition 080.74346 38000 219,815 080 190 - Mid-Tex Gas Division Addition 080.74347 37602 300,862 080 190 - Mid-Tex Gas Division Addition 080.74347 38000 297,868 080 190 - Mid-Tex Gas Division Addition 080.74348 37602 327,584 080 190 - Mid-Tex Gas Division Addition 080.74348 38000 140,393 080 190 - Mid-Tex Gas Division Addition 080.74349 37602 457,130 080 190 - Mid-Tex Gas Division Addition 080.74349 38000 304,753 080 190 - Mid-Tex Gas Division Addition 080.74353 37602 800,583 080 190 - Mid-Tex Gas Division Addition 080.74353 38000 200,146 080 190 - Mid-Tex Gas Division Addition 080.74356 37602 851,328 080 190 - Mid-Tex Gas Division Addition 080.74356 38000 212,832 080 190 - Mid-Tex Gas Division Addition 080.74362 37602 8,764 080 190 - Mid-Tex Gas Division Addition 080.74362 38000 974 080 190 - Mid-Tex Gas Division Addition 080.74363 38000 20,764 080 190 - Mid-Tex Gas Division Addition 080.74363 38500 42,148 080 190 - Mid-Tex Gas Division Addition 080.74367 37602 - 080 190 - Mid-Tex Gas Division Addition 080.74372 37602 210,486 080 190 - Mid-Tex Gas Division Addition 080.74373 37602 152 080 190 - Mid-Tex Gas Division Addition 080.74379 37602 14,527 080 190 - Mid-Tex Gas Division Addition 080.74379 38000 1,614 080 190 - Mid-Tex Gas Division Addition 080.74382 37602 (437,509) 080 190 - Mid-Tex Gas Division Addition 080.74382 38000 (13,531) 080 190 - Mid-Tex Gas Division Addition 080.74386 37602 274,770 080 190 - Mid-Tex Gas Division Addition 080.74386 37800 60,611 080 190 - Mid-Tex Gas Division Addition 080.74386 38000 68,692 080 190 - Mid-Tex Gas Division Addition 080.74388 37602 9,502 080 190 - Mid-Tex Gas Division Addition 080.74390 37602 9,435 080 190 - Mid-Tex Gas Division Addition 080.74394 37602 1,413 080 190 - Mid-Tex Gas Division Addition 080.74397 37602 1,328 080 190 - Mid-Tex Gas Division Addition 080.74398 37602 6,323 080 190 - Mid-Tex Gas Division Addition 080.74402 37602 354,638 080 190 - Mid-Tex Gas Division Addition 080.74402 38000 39,404 080 190 - Mid-Tex Gas Division Addition 080.74404 37602 219,869 080 190 - Mid-Tex Gas Division Addition 080.74404 38000 62,014 080 190 - Mid-Tex Gas Division Addition 080.74408 37602 124,334 080 190 - Mid-Tex Gas Division Addition 080.74408 38000 31,083 080 190 - Mid-Tex Gas Division Addition 080.74409 37602 57,338 080 190 - Mid-Tex Gas Division Addition 080.74409 38000 38,225 080 190 - Mid-Tex Gas Division Addition 080.74410 37602 569,454 080 190 - Mid-Tex Gas Division Addition 080.74410 38000 306,629 080 190 - Mid-Tex Gas Division Addition 080.74412 37602 107 080 190 - Mid-Tex Gas Division Addition 080.74415 37602 684,079 080 190 - Mid-Tex Gas Division Addition 080.74415 38000 336,934 080 190 - Mid-Tex Gas Division Addition 080.74416 37602 400,539 080 190 - Mid-Tex Gas Division Addition 080.74416 38000 267,026 080 190 - Mid-Tex Gas Division Addition 080.74417 37602 429,580 080 190 - Mid-Tex Gas Division Addition 080.74417 38000 286,387 080 190 - Mid-Tex Gas Division Addition 080.74418 37602 426,257 080 190 - Mid-Tex Gas Division Addition 080.74418 38000 426,257 MTX Additions by FERC Page 77 of 101 475 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.74419 37602 494,728 080 190 - Mid-Tex Gas Division Addition 080.74419 38000 329,818 080 190 - Mid-Tex Gas Division Addition 080.74421 37602 478,956 080 190 - Mid-Tex Gas Division Addition 080.74421 38000 391,873 080 190 - Mid-Tex Gas Division Addition 080.74422 37602 903,371 080 190 - Mid-Tex Gas Division Addition 080.74422 38000 18,436 080 190 - Mid-Tex Gas Division Addition 080.74424 37602 741,684 080 190 - Mid-Tex Gas Division Addition 080.74424 38000 39,036 080 190 - Mid-Tex Gas Division Addition 080.74425 37602 338,903 080 190 - Mid-Tex Gas Division Addition 080.74425 38000 338,903 080 190 - Mid-Tex Gas Division Addition 080.74426 37602 4,563 080 190 - Mid-Tex Gas Division Addition 080.74426 38000 4,563 080 190 - Mid-Tex Gas Division Addition 080.74428 37601 - 080 190 - Mid-Tex Gas Division Addition 080.74430 37602 205,621 080 190 - Mid-Tex Gas Division Addition 080.74430 38000 15,477 080 190 - Mid-Tex Gas Division Addition 080.74433 37602 1,198,543 080 190 - Mid-Tex Gas Division Addition 080.74433 38000 133,171 080 190 - Mid-Tex Gas Division Addition 080.74434 37800 0 080 190 - Mid-Tex Gas Division Addition 080.74435 37602 19,658 080 190 - Mid-Tex Gas Division Addition 080.74435 38000 10,585 080 190 - Mid-Tex Gas Division Addition 080.74438 37602 966 080 190 - Mid-Tex Gas Division Addition 080.74439 37602 312,314 080 190 - Mid-Tex Gas Division Addition 080.74439 38000 245,390 080 190 - Mid-Tex Gas Division Addition 080.74440 37602 427,972 080 190 - Mid-Tex Gas Division Addition 080.74440 38000 183,417 080 190 - Mid-Tex Gas Division Addition 080.74441 37602 352,731 080 190 - Mid-Tex Gas Division Addition 080.74441 38000 151,170 080 190 - Mid-Tex Gas Division Addition 080.74442 37602 672,925 080 190 - Mid-Tex Gas Division Addition 080.74442 38000 168,231 080 190 - Mid-Tex Gas Division Addition 080.74443 37602 367,948 080 190 - Mid-Tex Gas Division Addition 080.74443 38000 91,987 080 190 - Mid-Tex Gas Division Addition 080.74447 37602 8,329 080 190 - Mid-Tex Gas Division Addition 080.74450 37602 1,971 080 190 - Mid-Tex Gas Division Addition 080.74450 38000 493 080 190 - Mid-Tex Gas Division Addition 080.74452 37602 (33) 080 190 - Mid-Tex Gas Division Addition 080.74454 37602 350,086 080 190 - Mid-Tex Gas Division Addition 080.74454 38000 286,434 080 190 - Mid-Tex Gas Division Addition 080.74457 37602 2,314 080 190 - Mid-Tex Gas Division Addition 080.74457 38000 408 080 190 - Mid-Tex Gas Division Addition 080.74458 37602 225,802 080 190 - Mid-Tex Gas Division Addition 080.74458 38000 75,267 080 190 - Mid-Tex Gas Division Addition 080.74459 37601 230 080 190 - Mid-Tex Gas Division Addition 080.74459 37602 720 080 190 - Mid-Tex Gas Division Addition 080.74459 37800 489 080 190 - Mid-Tex Gas Division Addition 080.74461 37602 151,474 080 190 - Mid-Tex Gas Division Addition 080.74466 37602 1,568,754 080 190 - Mid-Tex Gas Division Addition 080.74466 38000 276,839 080 190 - Mid-Tex Gas Division Addition 080.74471 37602 1,364,246 080 190 - Mid-Tex Gas Division Addition 080.74471 38000 240,749 080 190 - Mid-Tex Gas Division Addition 080.74474 37602 - 080 190 - Mid-Tex Gas Division Addition 080.74475 37602 335,079 080 190 - Mid-Tex Gas Division Addition 080.74475 38000 37,231 080 190 - Mid-Tex Gas Division Addition 080.74477 37602 70,029 080 190 - Mid-Tex Gas Division Addition 080.74477 38000 3,686 080 190 - Mid-Tex Gas Division Addition 080.74484 37602 5,531 080 190 - Mid-Tex Gas Division Addition 080.74485 37602 524 080 190 - Mid-Tex Gas Division Addition 080.74486 37602 160 080 190 - Mid-Tex Gas Division Addition 080.74488 37602 7,327 080 190 - Mid-Tex Gas Division Addition 080.74490 37602 274,263 080 190 - Mid-Tex Gas Division Addition 080.74490 38000 68,566 080 190 - Mid-Tex Gas Division Addition 080.74491 37602 2,539 080 190 - Mid-Tex Gas Division Addition 080.74492 37602 163,808 080 190 - Mid-Tex Gas Division Addition 080.74493 37602 181,573 080 190 - Mid-Tex Gas Division Addition 080.74496 37602 11,413 080 190 - Mid-Tex Gas Division Addition 080.74499 37602 412,173 080 190 - Mid-Tex Gas Division Addition 080.74501 37602 39,792 080 190 - Mid-Tex Gas Division Addition 080.74501 38000 4,421 080 190 - Mid-Tex Gas Division Addition 080.74505 37602 35,619 080 190 - Mid-Tex Gas Division Addition 080.74508 37601 - 080 190 - Mid-Tex Gas Division Addition 080.74508 37602 46,852 080 190 - Mid-Tex Gas Division Addition 080.74509 37600 - 080 190 - Mid-Tex Gas Division Addition 080.74509 37602 50,617 080 190 - Mid-Tex Gas Division Addition 080.74510 37602 1,445 080 190 - Mid-Tex Gas Division Addition 080.74511 37602 381,292 080 190 - Mid-Tex Gas Division Addition 080.74511 38000 179,431 080 190 - Mid-Tex Gas Division Addition 080.74514 37602 417,485 080 190 - Mid-Tex Gas Division Addition 080.74514 38000 215,068 080 190 - Mid-Tex Gas Division Addition 080.74515 37602 574,201 080 190 - Mid-Tex Gas Division Addition 080.74515 38000 257,974 080 190 - Mid-Tex Gas Division Addition 080.74532 37602 391,903 080 190 - Mid-Tex Gas Division Addition 080.74532 38000 391,903 080 190 - Mid-Tex Gas Division Addition 080.74533 37602 93,883 080 190 - Mid-Tex Gas Division Addition 080.74534 37602 157,165 080 190 - Mid-Tex Gas Division Addition 080.74539 37601 1,516,062 080 190 - Mid-Tex Gas Division Addition 080.74539 37602 114,112 080 190 - Mid-Tex Gas Division Addition 080.74540 37602 (468) 080 190 - Mid-Tex Gas Division Addition 080.74543 37602 61,842 080 190 - Mid-Tex Gas Division Addition 080.74544 37602 45,348 080 190 - Mid-Tex Gas Division Addition 080.74545 37602 722,522 080 190 - Mid-Tex Gas Division Addition 080.74545 38000 180,630 080 190 - Mid-Tex Gas Division Addition 080.74553 37601 (4,725) 080 190 - Mid-Tex Gas Division Addition 080.74554 37602 20,352 080 190 - Mid-Tex Gas Division Addition 080.74556 37602 149,866 080 190 - Mid-Tex Gas Division Addition 080.74556 38000 (29,921) 080 190 - Mid-Tex Gas Division Addition 080.74559 37602 50,798 080 190 - Mid-Tex Gas Division Addition 080.74559 38000 16,933 080 190 - Mid-Tex Gas Division Addition 080.74565 37602 486,455 080 190 - Mid-Tex Gas Division Addition 080.74565 38000 25,603 080 190 - Mid-Tex Gas Division Addition 080.74568 37602 641,371 080 190 - Mid-Tex Gas Division Addition 080.74568 38000 213,790 080 190 - Mid-Tex Gas Division Addition 080.74571 37602 104,293 080 190 - Mid-Tex Gas Division Addition 080.74571 37800 44,697 080 190 - Mid-Tex Gas Division Addition 080.74572 37602 88,053 080 190 - Mid-Tex Gas Division Addition 080.74572 37800 31,448 080 190 - Mid-Tex Gas Division Addition 080.74572 38000 6,290 080 190 - Mid-Tex Gas Division Addition 080.74573 37602 74,372 080 190 - Mid-Tex Gas Division Addition 080.74574 37602 201,095 MTX Additions by FERC Page 78 of 101 476 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.74575 37602 170,967 080 190 - Mid-Tex Gas Division Addition 080.74575 38000 5,288 080 190 - Mid-Tex Gas Division Addition 080.74578 37602 3 080 190 - Mid-Tex Gas Division Addition 080.74580 37602 1,574 080 190 - Mid-Tex Gas Division Addition 080.74580 37800 2,360 080 190 - Mid-Tex Gas Division Addition 080.74582 37602 53,484 080 190 - Mid-Tex Gas Division Addition 080.74582 37800 80,226 080 190 - Mid-Tex Gas Division Addition 080.74583 37602 65,340 080 190 - Mid-Tex Gas Division Addition 080.74583 37800 28,003 080 190 - Mid-Tex Gas Division Addition 080.74586 37602 36,631 080 190 - Mid-Tex Gas Division Addition 080.74586 37800 54,947 080 190 - Mid-Tex Gas Division Addition 080.74589 37602 237,408 080 190 - Mid-Tex Gas Division Addition 080.74589 38000 26,379 080 190 - Mid-Tex Gas Division Addition 080.74591 37602 62,825 080 190 - Mid-Tex Gas Division Addition 080.74591 37800 86,384 080 190 - Mid-Tex Gas Division Addition 080.74591 38000 7,853 080 190 - Mid-Tex Gas Division Addition 080.74592 37602 157,655 080 190 - Mid-Tex Gas Division Addition 080.74592 37800 31,531 080 190 - Mid-Tex Gas Division Addition 080.74592 38000 21,021 080 190 - Mid-Tex Gas Division Addition 080.74593 37602 310,866 080 190 - Mid-Tex Gas Division Addition 080.74595 37602 169,449 080 190 - Mid-Tex Gas Division Addition 080.74597 39004 - 080 190 - Mid-Tex Gas Division Addition 080.74599 37602 128,388 080 190 - Mid-Tex Gas Division Addition 080.74599 37800 64,194 080 190 - Mid-Tex Gas Division Addition 080.74599 38000 21,398 080 190 - Mid-Tex Gas Division Addition 080.74600 37602 671 080 190 - Mid-Tex Gas Division Addition 080.74601 37602 4,366 080 190 - Mid-Tex Gas Division Addition 080.74601 38000 4,366 080 190 - Mid-Tex Gas Division Addition 080.74603 37602 60,510 080 190 - Mid-Tex Gas Division Addition 080.74603 37800 90,765 080 190 - Mid-Tex Gas Division Addition 080.74604 37602 58,168 080 190 - Mid-Tex Gas Division Addition 080.74604 37800 87,252 080 190 - Mid-Tex Gas Division Addition 080.74605 37602 539 080 190 - Mid-Tex Gas Division Addition 080.74606 37602 88,002 080 190 - Mid-Tex Gas Division Addition 080.74606 37800 31,429 080 190 - Mid-Tex Gas Division Addition 080.74606 38000 6,286 080 190 - Mid-Tex Gas Division Addition 080.74609 37602 153,912 080 190 - Mid-Tex Gas Division Addition 080.74609 37800 138,521 080 190 - Mid-Tex Gas Division Addition 080.74609 38000 15,391 080 190 - Mid-Tex Gas Division Addition 080.74610 37602 14,393 080 190 - Mid-Tex Gas Division Addition 080.74610 37800 57,571 080 190 - Mid-Tex Gas Division Addition 080.74615 37602 47,633 080 190 - Mid-Tex Gas Division Addition 080.74615 38000 5,104 080 190 - Mid-Tex Gas Division Addition 080.74617 37602 197,943 080 190 - Mid-Tex Gas Division Addition 080.74617 38000 17,212 080 190 - Mid-Tex Gas Division Addition 080.74619 37602 864 080 190 - Mid-Tex Gas Division Addition 080.74623 37602 373,396 080 190 - Mid-Tex Gas Division Addition 080.74623 38000 160,027 080 190 - Mid-Tex Gas Division Addition 080.74625 37602 304,125 080 190 - Mid-Tex Gas Division Addition 080.74625 38000 33,792 080 190 - Mid-Tex Gas Division Addition 080.74629 37602 5,651 080 190 - Mid-Tex Gas Division Addition 080.74630 37602 61,034 080 190 - Mid-Tex Gas Division Addition 080.74631 38000 143,530 080 190 - Mid-Tex Gas Division Addition 080.74633 37602 155,144 080 190 - Mid-Tex Gas Division Addition 080.74636 37602 127,606 080 190 - Mid-Tex Gas Division Addition 080.74636 38000 42,535 080 190 - Mid-Tex Gas Division Addition 080.74642 37602 784,323 080 190 - Mid-Tex Gas Division Addition 080.74642 38000 183,977 080 190 - Mid-Tex Gas Division Addition 080.74643 37602 111,140 080 190 - Mid-Tex Gas Division Addition 080.74643 38000 7,094 080 190 - Mid-Tex Gas Division Addition 080.74644 37602 194,226 080 190 - Mid-Tex Gas Division Addition 080.74645 37602 1,956,914 080 190 - Mid-Tex Gas Division Addition 080.74645 38000 262 080 190 - Mid-Tex Gas Division Addition 080.74647 37602 434,381 080 190 - Mid-Tex Gas Division Addition 080.74647 38000 186,163 080 190 - Mid-Tex Gas Division Addition 080.74648 37602 593,081 080 190 - Mid-Tex Gas Division Addition 080.74648 38000 104,661 080 190 - Mid-Tex Gas Division Addition 080.74649 37602 536 080 190 - Mid-Tex Gas Division Addition 080.74650 37602 1,192,313 080 190 - Mid-Tex Gas Division Addition 080.74650 38000 298,078 080 190 - Mid-Tex Gas Division Addition 080.74653 37602 4,529 080 190 - Mid-Tex Gas Division Addition 080.74655 37601 5,793,395 080 190 - Mid-Tex Gas Division Addition 080.74655 37602 128,742 080 190 - Mid-Tex Gas Division Addition 080.74655 37800 514,968 080 190 - Mid-Tex Gas Division Addition 080.74657 37602 193,172 080 190 - Mid-Tex Gas Division Addition 080.74657 38000 64,391 080 190 - Mid-Tex Gas Division Addition 080.74660 37602 29,144 080 190 - Mid-Tex Gas Division Addition 080.74660 38000 29 080 190 - Mid-Tex Gas Division Addition 080.74662 37602 3,497 080 190 - Mid-Tex Gas Division Addition 080.74663 37602 401,996 080 190 - Mid-Tex Gas Division Addition 080.74663 38000 80,399 080 190 - Mid-Tex Gas Division Addition 080.74664 37602 338,810 080 190 - Mid-Tex Gas Division Addition 080.74664 38000 338,810 080 190 - Mid-Tex Gas Division Addition 080.74665 37602 674,975 080 190 - Mid-Tex Gas Division Addition 080.74665 38000 134,995 080 190 - Mid-Tex Gas Division Addition 080.74666 37602 691,115 080 190 - Mid-Tex Gas Division Addition 080.74666 38000 460,743 080 190 - Mid-Tex Gas Division Addition 080.74667 37602 41,301 080 190 - Mid-Tex Gas Division Addition 080.74668 37601 98,395 080 190 - Mid-Tex Gas Division Addition 080.74669 37602 209,968 080 190 - Mid-Tex Gas Division Addition 080.74669 38000 25,951 080 190 - Mid-Tex Gas Division Addition 080.74671 37602 325,605 080 190 - Mid-Tex Gas Division Addition 080.74671 38000 81,401 080 190 - Mid-Tex Gas Division Addition 080.74672 37602 337,177 080 190 - Mid-Tex Gas Division Addition 080.74672 38000 84,294 080 190 - Mid-Tex Gas Division Addition 080.74673 37602 302,208 080 190 - Mid-Tex Gas Division Addition 080.74673 38000 117,525 080 190 - Mid-Tex Gas Division Addition 080.74674 37602 251,082 080 190 - Mid-Tex Gas Division Addition 080.74674 38000 62,771 080 190 - Mid-Tex Gas Division Addition 080.74675 37602 309,444 080 190 - Mid-Tex Gas Division Addition 080.74675 38000 77,361 080 190 - Mid-Tex Gas Division Addition 080.74676 37602 417,982 080 190 - Mid-Tex Gas Division Addition 080.74676 38000 139,327 080 190 - Mid-Tex Gas Division Addition 080.74677 37602 454,207 080 190 - Mid-Tex Gas Division Addition 080.74677 38000 113,552 080 190 - Mid-Tex Gas Division Addition 080.74678 37602 317,194 080 190 - Mid-Tex Gas Division Addition 080.74678 38000 105,731 MTX Additions by FERC Page 79 of 101 477 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.74679 37602 332,864 080 190 - Mid-Tex Gas Division Addition 080.74679 38000 68,177 080 190 - Mid-Tex Gas Division Addition 080.74680 37602 436,404 080 190 - Mid-Tex Gas Division Addition 080.74680 38000 95,796 080 190 - Mid-Tex Gas Division Addition 080.74681 37602 385,721 080 190 - Mid-Tex Gas Division Addition 080.74681 38000 96,430 080 190 - Mid-Tex Gas Division Addition 080.74682 37602 246,885 080 190 - Mid-Tex Gas Division Addition 080.74682 38000 61,721 080 190 - Mid-Tex Gas Division Addition 080.74684 37602 800,245 080 190 - Mid-Tex Gas Division Addition 080.74684 38000 533,497 080 190 - Mid-Tex Gas Division Addition 080.74685 37602 17,438 080 190 - Mid-Tex Gas Division Addition 080.74685 38000 4,431 080 190 - Mid-Tex Gas Division Addition 080.74686 37602 25,112 080 190 - Mid-Tex Gas Division Addition 080.74688 37602 109 080 190 - Mid-Tex Gas Division Addition 080.74691 37602 76,688 080 190 - Mid-Tex Gas Division Addition 080.74692 37602 154,215 080 190 - Mid-Tex Gas Division Addition 080.74693 37602 260,386 080 190 - Mid-Tex Gas Division Addition 080.74693 38000 28,932 080 190 - Mid-Tex Gas Division Addition 080.74694 38000 4,995 080 190 - Mid-Tex Gas Division Addition 080.74695 37602 148,814 080 190 - Mid-Tex Gas Division Addition 080.74696 37602 198,386 080 190 - Mid-Tex Gas Division Addition 080.74701 37602 160 080 190 - Mid-Tex Gas Division Addition 080.74702 37602 412,436 080 190 - Mid-Tex Gas Division Addition 080.74703 37602 838,212 080 190 - Mid-Tex Gas Division Addition 080.74703 38000 93,135 080 190 - Mid-Tex Gas Division Addition 080.74704 37602 40,288 080 190 - Mid-Tex Gas Division Addition 080.74704 37800 60,432 080 190 - Mid-Tex Gas Division Addition 080.74705 37602 60,237 080 190 - Mid-Tex Gas Division Addition 080.74705 37800 40,131 080 190 - Mid-Tex Gas Division Addition 080.74706 37602 95,895 080 190 - Mid-Tex Gas Division Addition 080.74706 37800 63,930 080 190 - Mid-Tex Gas Division Addition 080.74708 37602 15,438 080 190 - Mid-Tex Gas Division Addition 080.74709 37602 419,766 080 190 - Mid-Tex Gas Division Addition 080.74709 38000 139,922 080 190 - Mid-Tex Gas Division Addition 080.74710 37602 6,499 080 190 - Mid-Tex Gas Division Addition 080.74711 37602 227,009 080 190 - Mid-Tex Gas Division Addition 080.74712 37602 1,680 080 190 - Mid-Tex Gas Division Addition 080.74719 37601 54,078 080 190 - Mid-Tex Gas Division Addition 080.74719 37602 144,207 080 190 - Mid-Tex Gas Division Addition 080.74719 37800 125,197 080 190 - Mid-Tex Gas Division Addition 080.74719 38000 36,052 080 190 - Mid-Tex Gas Division Addition 080.74722 37602 7,362 080 190 - Mid-Tex Gas Division Addition 080.74726 37602 1,177 080 190 - Mid-Tex Gas Division Addition 080.74728 37602 210,634 080 190 - Mid-Tex Gas Division Addition 080.74729 37602 280,486 080 190 - Mid-Tex Gas Division Addition 080.74730 37602 133,473 080 190 - Mid-Tex Gas Division Addition 080.74732 37602 71 080 190 - Mid-Tex Gas Division Addition 080.74734 37602 12,340 080 190 - Mid-Tex Gas Division Addition 080.74739 37602 380,597 080 190 - Mid-Tex Gas Division Addition 080.74739 38000 126,866 080 190 - Mid-Tex Gas Division Addition 080.74746 37602 (40,946) 080 190 - Mid-Tex Gas Division Addition 080.74746 38100 (1,558) 080 190 - Mid-Tex Gas Division Addition 080.74747 37602 219,476 080 190 - Mid-Tex Gas Division Addition 080.74747 38000 146,317 080 190 - Mid-Tex Gas Division Addition 080.74749 37602 45,306 080 190 - Mid-Tex Gas Division Addition 080.74750 38100 46,243 080 190 - Mid-Tex Gas Division Addition 080.74751 37602 199,952 080 190 - Mid-Tex Gas Division Addition 080.74752 37602 15,997 080 190 - Mid-Tex Gas Division Addition 080.74752 38000 1,777 080 190 - Mid-Tex Gas Division Addition 080.74753 37602 531,848 080 190 - Mid-Tex Gas Division Addition 080.74753 38000 59,094 080 190 - Mid-Tex Gas Division Addition 080.74755 37602 812 080 190 - Mid-Tex Gas Division Addition 080.74755 37900 2,436 080 190 - Mid-Tex Gas Division Addition 080.74756 37602 32,592 080 190 - Mid-Tex Gas Division Addition 080.74756 37800 97,776 080 190 - Mid-Tex Gas Division Addition 080.74757 37602 377,239 080 190 - Mid-Tex Gas Division Addition 080.74757 38000 66,572 080 190 - Mid-Tex Gas Division Addition 080.74759 37602 157,013 080 190 - Mid-Tex Gas Division Addition 080.74759 38000 157,013 080 190 - Mid-Tex Gas Division Addition 080.74762 38000 (629) 080 190 - Mid-Tex Gas Division Addition 080.74765 38000 7,073 080 190 - Mid-Tex Gas Division Addition 080.74768 37602 361,130 080 190 - Mid-Tex Gas Division Addition 080.74769 37602 215,507 080 190 - Mid-Tex Gas Division Addition 080.74771 37602 1,605 080 190 - Mid-Tex Gas Division Addition 080.74772 37602 1,320,158 080 190 - Mid-Tex Gas Division Addition 080.74773 37601 494,939 080 190 - Mid-Tex Gas Division Addition 080.74773 37800 1,089,374 080 190 - Mid-Tex Gas Division Addition 080.74775 37602 23,649 080 190 - Mid-Tex Gas Division Addition 080.74775 37800 63,941 080 190 - Mid-Tex Gas Division Addition 080.74776 37601 10,434 080 190 - Mid-Tex Gas Division Addition 080.74776 37602 4,869 080 190 - Mid-Tex Gas Division Addition 080.74776 37800 54,256 080 190 - Mid-Tex Gas Division Addition 080.74778 38000 28,165 080 190 - Mid-Tex Gas Division Addition 080.74779 37602 5,048 080 190 - Mid-Tex Gas Division Addition 080.74779 38000 707 080 190 - Mid-Tex Gas Division Addition 080.74780 37602 38,940 080 190 - Mid-Tex Gas Division Addition 080.74780 37800 58,411 080 190 - Mid-Tex Gas Division Addition 080.74782 37602 351,309 080 190 - Mid-Tex Gas Division Addition 080.74782 38000 351,309 080 190 - Mid-Tex Gas Division Addition 080.74783 37602 32,272 080 190 - Mid-Tex Gas Division Addition 080.74783 37800 59,934 080 190 - Mid-Tex Gas Division Addition 080.74785 37602 253 080 190 - Mid-Tex Gas Division Addition 080.74786 37602 114,743 080 190 - Mid-Tex Gas Division Addition 080.74786 38000 (111,294) 080 190 - Mid-Tex Gas Division Addition 080.74787 37602 20,046 080 190 - Mid-Tex Gas Division Addition 080.74791 37602 1,537 080 190 - Mid-Tex Gas Division Addition 080.74794 37602 486,802 080 190 - Mid-Tex Gas Division Addition 080.74794 38000 486,802 080 190 - Mid-Tex Gas Division Addition 080.74798 37602 4,240 080 190 - Mid-Tex Gas Division Addition 080.74799 37602 411,319 080 190 - Mid-Tex Gas Division Addition 080.74799 38000 274,212 080 190 - Mid-Tex Gas Division Addition 080.74805 37602 44,213 080 190 - Mid-Tex Gas Division Addition 080.74805 38000 2,327 080 190 - Mid-Tex Gas Division Addition 080.74806 39400 84,505 080 190 - Mid-Tex Gas Division Addition 080.74807 37602 13,499 080 190 - Mid-Tex Gas Division Addition 080.74808 37602 92,288 080 190 - Mid-Tex Gas Division Addition 080.74808 38000 4,857 MTX Additions by FERC Page 80 of 101 478 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.74809 37602 143,174 080 190 - Mid-Tex Gas Division Addition 080.74809 38000 14,160 080 190 - Mid-Tex Gas Division Addition 080.74810 37602 341,454 080 190 - Mid-Tex Gas Division Addition 080.74811 37602 333,757 080 190 - Mid-Tex Gas Division Addition 080.74822 37601 75,451 080 190 - Mid-Tex Gas Division Addition 080.74822 37602 301,803 080 190 - Mid-Tex Gas Division Addition 080.74825 37602 93,053 080 190 - Mid-Tex Gas Division Addition 080.74825 38000 23,263 080 190 - Mid-Tex Gas Division Addition 080.74830 37602 29,037 080 190 - Mid-Tex Gas Division Addition 080.74830 37800 35,490 080 190 - Mid-Tex Gas Division Addition 080.74831 37602 55,343 080 190 - Mid-Tex Gas Division Addition 080.74831 37800 26,044 080 190 - Mid-Tex Gas Division Addition 080.74834 37602 1,480 080 190 - Mid-Tex Gas Division Addition 080.74835 37602 39,175 080 190 - Mid-Tex Gas Division Addition 080.74839 37602 34,257 080 190 - Mid-Tex Gas Division Addition 080.74839 37800 51,386 080 190 - Mid-Tex Gas Division Addition 080.74842 38000 7,365 080 190 - Mid-Tex Gas Division Addition 080.74845 37602 327,604 080 190 - Mid-Tex Gas Division Addition 080.74845 38000 71,913 080 190 - Mid-Tex Gas Division Addition 080.74847 37602 194,321 080 190 - Mid-Tex Gas Division Addition 080.74847 38000 194,321 080 190 - Mid-Tex Gas Division Addition 080.74851 37602 (648) 080 190 - Mid-Tex Gas Division Addition 080.74854 37602 156,779 080 190 - Mid-Tex Gas Division Addition 080.74854 38000 156,779 080 190 - Mid-Tex Gas Division Addition 080.74861 37602 606 080 190 - Mid-Tex Gas Division Addition 080.74861 38000 32 080 190 - Mid-Tex Gas Division Addition 080.74863 37602 3,613 080 190 - Mid-Tex Gas Division Addition 080.74863 38000 402 080 190 - Mid-Tex Gas Division Addition 080.74866 37602 40,758 080 190 - Mid-Tex Gas Division Addition 080.74866 37800 61,137 080 190 - Mid-Tex Gas Division Addition 080.74867 37602 55,444 080 190 - Mid-Tex Gas Division Addition 080.74867 37800 76,236 080 190 - Mid-Tex Gas Division Addition 080.74867 38000 6,931 080 190 - Mid-Tex Gas Division Addition 080.74868 38000 96,137 080 190 - Mid-Tex Gas Division Addition 080.74869 37602 81,498 080 190 - Mid-Tex Gas Division Addition 080.74869 37800 122,247 080 190 - Mid-Tex Gas Division Addition 080.74873 37602 42,088 080 190 - Mid-Tex Gas Division Addition 080.74873 37800 63,132 080 190 - Mid-Tex Gas Division Addition 080.74874 37602 36,261 080 190 - Mid-Tex Gas Division Addition 080.74874 37800 54,392 080 190 - Mid-Tex Gas Division Addition 080.74875 37602 33,454 080 190 - Mid-Tex Gas Division Addition 080.74875 37800 50,181 080 190 - Mid-Tex Gas Division Addition 080.74877 37602 39,293 080 190 - Mid-Tex Gas Division Addition 080.74877 37800 58,940 080 190 - Mid-Tex Gas Division Addition 080.74879 37602 92,178 080 190 - Mid-Tex Gas Division Addition 080.74879 37800 53,771 080 190 - Mid-Tex Gas Division Addition 080.74879 38000 7,682 080 190 - Mid-Tex Gas Division Addition 080.74880 37602 25,787 080 190 - Mid-Tex Gas Division Addition 080.74881 37602 663,271 080 190 - Mid-Tex Gas Division Addition 080.74881 38000 73,697 080 190 - Mid-Tex Gas Division Addition 080.74885 37602 32,299 080 190 - Mid-Tex Gas Division Addition 080.74887 37602 31,727 080 190 - Mid-Tex Gas Division Addition 080.74888 37600 770 080 190 - Mid-Tex Gas Division Addition 080.74888 37601 307,247 080 190 - Mid-Tex Gas Division Addition 080.74889 37602 10,576 080 190 - Mid-Tex Gas Division Addition 080.74890 37602 62,742 080 190 - Mid-Tex Gas Division Addition 080.74890 38100 2,406 080 190 - Mid-Tex Gas Division Addition 080.74892 37602 560 080 190 - Mid-Tex Gas Division Addition 080.74893 37602 153,501 080 190 - Mid-Tex Gas Division Addition 080.74893 38000 153,501 080 190 - Mid-Tex Gas Division Addition 080.74897 37602 9,308 080 190 - Mid-Tex Gas Division Addition 080.74898 37602 603,771 080 190 - Mid-Tex Gas Division Addition 080.74898 38000 284,635 080 190 - Mid-Tex Gas Division Addition 080.74906 37602 99,737 080 190 - Mid-Tex Gas Division Addition 080.74906 38000 (2,046) 080 190 - Mid-Tex Gas Division Addition 080.74909 37602 376,997 080 190 - Mid-Tex Gas Division Addition 080.74909 38000 165,445 080 190 - Mid-Tex Gas Division Addition 080.74913 37602 210 080 190 - Mid-Tex Gas Division Addition 080.74915 37602 (8,749) 080 190 - Mid-Tex Gas Division Addition 080.74915 38000 8,920 080 190 - Mid-Tex Gas Division Addition 080.74917 37602 54,030 080 190 - Mid-Tex Gas Division Addition 080.74918 37602 66,803 080 190 - Mid-Tex Gas Division Addition 080.74922 37602 171,971 080 190 - Mid-Tex Gas Division Addition 080.74924 37602 69,905 080 190 - Mid-Tex Gas Division Addition 080.74924 38000 129,823 080 190 - Mid-Tex Gas Division Addition 080.74925 37602 402,378 080 190 - Mid-Tex Gas Division Addition 080.74925 38000 268,252 080 190 - Mid-Tex Gas Division Addition 080.74927 37602 33,050 080 190 - Mid-Tex Gas Division Addition 080.74927 38000 334 080 190 - Mid-Tex Gas Division Addition 080.74930 37602 141,739 080 190 - Mid-Tex Gas Division Addition 080.74931 37602 75,779 080 190 - Mid-Tex Gas Division Addition 080.74934 37601 3,557 080 190 - Mid-Tex Gas Division Addition 080.74935 37602 22,636 080 190 - Mid-Tex Gas Division Addition 080.74937 37602 28,209 080 190 - Mid-Tex Gas Division Addition 080.74941 37602 355,318 080 190 - Mid-Tex Gas Division Addition 080.74941 38000 2 080 190 - Mid-Tex Gas Division Addition 080.74943 37602 108,728 080 190 - Mid-Tex Gas Division Addition 080.74945 37602 45,368 080 190 - Mid-Tex Gas Division Addition 080.74946 37602 92 080 190 - Mid-Tex Gas Division Addition 080.74946 37800 276 080 190 - Mid-Tex Gas Division Addition 080.74946 38000 233 080 190 - Mid-Tex Gas Division Addition 080.74946 38100 276 080 190 - Mid-Tex Gas Division Addition 080.74949 37602 14,573 080 190 - Mid-Tex Gas Division Addition 080.74950 38000 11,548 080 190 - Mid-Tex Gas Division Addition 080.74954 37602 5,390 080 190 - Mid-Tex Gas Division Addition 080.74955 37602 145,296 080 190 - Mid-Tex Gas Division Addition 080.74956 37601 (11,552) 080 190 - Mid-Tex Gas Division Addition 080.74958 37601 212,629 080 190 - Mid-Tex Gas Division Addition 080.74960 37602 275,924 080 190 - Mid-Tex Gas Division Addition 080.74961 37602 167,525 080 190 - Mid-Tex Gas Division Addition 080.74962 38000 1,188 080 190 - Mid-Tex Gas Division Addition 080.74962 38100 1,769 080 190 - Mid-Tex Gas Division Addition 080.74965 37602 1,778 080 190 - Mid-Tex Gas Division Addition 080.74966 37602 674,439 080 190 - Mid-Tex Gas Division Addition 080.74968 37602 20,479 080 190 - Mid-Tex Gas Division Addition 080.74969 37602 60,543 080 190 - Mid-Tex Gas Division Addition 080.74970 37601 - MTX Additions by FERC Page 81 of 101 479 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.74970 37602 69,185 080 190 - Mid-Tex Gas Division Addition 080.74979 37602 (5,710) 080 190 - Mid-Tex Gas Division Addition 080.74980 37602 97,166 080 190 - Mid-Tex Gas Division Addition 080.74981 37602 535,797 080 190 - Mid-Tex Gas Division Addition 080.74981 38000 59,533 080 190 - Mid-Tex Gas Division Addition 080.74982 37602 119,527 080 190 - Mid-Tex Gas Division Addition 080.74983 37602 374,615 080 190 - Mid-Tex Gas Division Addition 080.74983 38000 160,549 080 190 - Mid-Tex Gas Division Addition 080.74984 37602 325,206 080 190 - Mid-Tex Gas Division Addition 080.74984 38000 6,637 080 190 - Mid-Tex Gas Division Addition 080.74985 37800 130,053 080 190 - Mid-Tex Gas Division Addition 080.74986 37602 17,086 080 190 - Mid-Tex Gas Division Addition 080.74986 38000 7,323 080 190 - Mid-Tex Gas Division Addition 080.74988 38000 118,863 080 190 - Mid-Tex Gas Division Addition 080.74990 37602 3,859 080 190 - Mid-Tex Gas Division Addition 080.74991 37602 21,780 080 190 - Mid-Tex Gas Division Addition 080.74993 37601 469,174 080 190 - Mid-Tex Gas Division Addition 080.74993 37602 8,231 080 190 - Mid-Tex Gas Division Addition 080.74993 38000 313,884 080 190 - Mid-Tex Gas Division Addition 080.74996 37602 386,639 080 190 - Mid-Tex Gas Division Addition 080.74996 38000 96,660 080 190 - Mid-Tex Gas Division Addition 080.75001 37602 10 080 190 - Mid-Tex Gas Division Addition 080.75001 38000 (2) 080 190 - Mid-Tex Gas Division Addition 080.75012 37602 1 080 190 - Mid-Tex Gas Division Addition 080.75012 37800 10 080 190 - Mid-Tex Gas Division Addition 080.75012 38000 10 080 190 - Mid-Tex Gas Division Addition 080.75012 38100 621 080 190 - Mid-Tex Gas Division Addition 080.75015 37602 415,366 080 190 - Mid-Tex Gas Division Addition 080.75017 37602 12,916 080 190 - Mid-Tex Gas Division Addition 080.75018 37602 47,131 080 190 - Mid-Tex Gas Division Addition 080.75021 37602 1,608 080 190 - Mid-Tex Gas Division Addition 080.75023 37602 31,675 080 190 - Mid-Tex Gas Division Addition 080.75025 37602 341,492 080 190 - Mid-Tex Gas Division Addition 080.75025 38000 7,850 080 190 - Mid-Tex Gas Division Addition 080.75029 37602 834 080 190 - Mid-Tex Gas Division Addition 080.75029 38000 93 080 190 - Mid-Tex Gas Division Addition 080.75032 37602 376,728 080 190 - Mid-Tex Gas Division Addition 080.75032 38000 88,368 080 190 - Mid-Tex Gas Division Addition 080.75033 39800 (34) 080 190 - Mid-Tex Gas Division Addition 080.75041 37602 1,392 080 190 - Mid-Tex Gas Division Addition 080.75041 38000 246 080 190 - Mid-Tex Gas Division Addition 080.75043 37602 103,751 080 190 - Mid-Tex Gas Division Addition 080.75045 37602 34,517 080 190 - Mid-Tex Gas Division Addition 080.75047 37602 11,923 080 190 - Mid-Tex Gas Division Addition 080.75048 37602 362,332 080 190 - Mid-Tex Gas Division Addition 080.75048 38000 120,777 080 190 - Mid-Tex Gas Division Addition 080.75049 37602 480 080 190 - Mid-Tex Gas Division Addition 080.75052 37602 21,019 080 190 - Mid-Tex Gas Division Addition 080.75053 37601 58,495 080 190 - Mid-Tex Gas Division Addition 080.75054 37602 1,688 080 190 - Mid-Tex Gas Division Addition 080.75058 37602 936,659 080 190 - Mid-Tex Gas Division Addition 080.75058 38000 152,479 080 190 - Mid-Tex Gas Division Addition 080.75059 37602 288,793 080 190 - Mid-Tex Gas Division Addition 080.75059 38000 277,467 080 190 - Mid-Tex Gas Division Addition 080.75060 37602 14,352 080 190 - Mid-Tex Gas Division Addition 080.75060 38000 (0) 080 190 - Mid-Tex Gas Division Addition 080.75060 38500 3,588 080 190 - Mid-Tex Gas Division Addition 080.75064 37602 (3,382) 080 190 - Mid-Tex Gas Division Addition 080.75066 37602 807 080 190 - Mid-Tex Gas Division Addition 080.75068 37602 299,944 080 190 - Mid-Tex Gas Division Addition 080.75068 38000 99,981 080 190 - Mid-Tex Gas Division Addition 080.75069 37602 320,354 080 190 - Mid-Tex Gas Division Addition 080.75069 38000 20,448 080 190 - Mid-Tex Gas Division Addition 080.75071 37602 311,276 080 190 - Mid-Tex Gas Division Addition 080.75071 38000 16,383 080 190 - Mid-Tex Gas Division Addition 080.75072 37602 632,752 080 190 - Mid-Tex Gas Division Addition 080.75072 38000 421,835 080 190 - Mid-Tex Gas Division Addition 080.75073 37602 324,024 080 190 - Mid-Tex Gas Division Addition 080.75073 38000 17,054 080 190 - Mid-Tex Gas Division Addition 080.75074 37602 399,712 080 190 - Mid-Tex Gas Division Addition 080.75074 38000 327,037 080 190 - Mid-Tex Gas Division Addition 080.75076 37602 16,086 080 190 - Mid-Tex Gas Division Addition 080.75077 37601 6,122 080 190 - Mid-Tex Gas Division Addition 080.75077 37602 51,423 080 190 - Mid-Tex Gas Division Addition 080.75077 37800 64,891 080 190 - Mid-Tex Gas Division Addition 080.75078 37602 604,591 080 190 - Mid-Tex Gas Division Addition 080.75078 38000 31,821 080 190 - Mid-Tex Gas Division Addition 080.75082 37602 659 080 190 - Mid-Tex Gas Division Addition 080.75083 37602 470,705 080 190 - Mid-Tex Gas Division Addition 080.75083 38000 201,731 080 190 - Mid-Tex Gas Division Addition 080.75084 37601 1,950,503 080 190 - Mid-Tex Gas Division Addition 080.75084 37800 428,159 080 190 - Mid-Tex Gas Division Addition 080.75089 37602 51,988 080 190 - Mid-Tex Gas Division Addition 080.75090 37602 3,036 080 190 - Mid-Tex Gas Division Addition 080.75091 37602 275,317 080 190 - Mid-Tex Gas Division Addition 080.75091 37800 32,390 080 190 - Mid-Tex Gas Division Addition 080.75091 38000 16,195 080 190 - Mid-Tex Gas Division Addition 080.75094 37602 26 080 190 - Mid-Tex Gas Division Addition 080.75097 37602 3,850 080 190 - Mid-Tex Gas Division Addition 080.75098 37602 12,410 080 190 - Mid-Tex Gas Division Addition 080.75102 37602 45,684 080 190 - Mid-Tex Gas Division Addition 080.75108 37602 9,725 080 190 - Mid-Tex Gas Division Addition 080.75110 37602 3,958 080 190 - Mid-Tex Gas Division Addition 080.75112 37602 8,851 080 190 - Mid-Tex Gas Division Addition 080.75112 38000 1,562 080 190 - Mid-Tex Gas Division Addition 080.75115 37602 89,323 080 190 - Mid-Tex Gas Division Addition 080.75115 38000 22,331 080 190 - Mid-Tex Gas Division Addition 080.75124 37601 13,221 080 190 - Mid-Tex Gas Division Addition 080.75124 37602 224,761 080 190 - Mid-Tex Gas Division Addition 080.75124 38000 26,442 080 190 - Mid-Tex Gas Division Addition 080.75129 37602 7,454 080 190 - Mid-Tex Gas Division Addition 080.75130 37602 32,720 080 190 - Mid-Tex Gas Division Addition 080.75132 37602 1,744 080 190 - Mid-Tex Gas Division Addition 080.75133 37602 319,096 080 190 - Mid-Tex Gas Division Addition 080.75133 38000 136,755 080 190 - Mid-Tex Gas Division Addition 080.75146 37602 378,471 080 190 - Mid-Tex Gas Division Addition 080.75146 38000 378,471 MTX Additions by FERC Page 82 of 101 480 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.75147 37602 459,336 080 190 - Mid-Tex Gas Division Addition 080.75147 38000 459,336 080 190 - Mid-Tex Gas Division Addition 080.75148 39800 - 080 190 - Mid-Tex Gas Division Addition 080.75149 37602 3,532 080 190 - Mid-Tex Gas Division Addition 080.75152 37602 62,976 080 190 - Mid-Tex Gas Division Addition 080.75152 38000 636 080 190 - Mid-Tex Gas Division Addition 080.75158 37602 13,541 080 190 - Mid-Tex Gas Division Addition 080.75159 37602 374,118 080 190 - Mid-Tex Gas Division Addition 080.75159 38000 374,118 080 190 - Mid-Tex Gas Division Addition 080.75160 37602 264,785 080 190 - Mid-Tex Gas Division Addition 080.75160 38000 52,957 080 190 - Mid-Tex Gas Division Addition 080.75161 37602 908,905 080 190 - Mid-Tex Gas Division Addition 080.75161 38000 181,781 080 190 - Mid-Tex Gas Division Addition 080.75162 37602 239,452 080 190 - Mid-Tex Gas Division Addition 080.75162 38000 26,606 080 190 - Mid-Tex Gas Division Addition 080.75164 37602 181,509 080 190 - Mid-Tex Gas Division Addition 080.75165 37602 215,398 080 190 - Mid-Tex Gas Division Addition 080.75170 37800 28,682 080 190 - Mid-Tex Gas Division Addition 080.75171 37602 18,528 080 190 - Mid-Tex Gas Division Addition 080.75171 37800 78,558 080 190 - Mid-Tex Gas Division Addition 080.75174 37602 34,316 080 190 - Mid-Tex Gas Division Addition 080.75174 37800 51,335 080 190 - Mid-Tex Gas Division Addition 080.75175 37800 5,743 080 190 - Mid-Tex Gas Division Addition 080.75184 37602 231,566 080 190 - Mid-Tex Gas Division Addition 080.75184 38000 77,189 080 190 - Mid-Tex Gas Division Addition 080.75186 37602 20,390 080 190 - Mid-Tex Gas Division Addition 080.75188 37602 270,506 080 190 - Mid-Tex Gas Division Addition 080.75188 38000 14,237 080 190 - Mid-Tex Gas Division Addition 080.75190 37602 127,354 080 190 - Mid-Tex Gas Division Addition 080.75190 38000 104,199 080 190 - Mid-Tex Gas Division Addition 080.75195 37800 13,081 080 190 - Mid-Tex Gas Division Addition 080.75196 37601 6,307 080 190 - Mid-Tex Gas Division Addition 080.75196 37602 13,876 080 190 - Mid-Tex Gas Division Addition 080.75196 37900 42,890 080 190 - Mid-Tex Gas Division Addition 080.75198 37602 39,776 080 190 - Mid-Tex Gas Division Addition 080.75198 37900 107,543 080 190 - Mid-Tex Gas Division Addition 080.75199 37602 30,131 080 190 - Mid-Tex Gas Division Addition 080.75199 37800 80,686 080 190 - Mid-Tex Gas Division Addition 080.75200 37602 47,738 080 190 - Mid-Tex Gas Division Addition 080.75200 37800 47,738 080 190 - Mid-Tex Gas Division Addition 080.75202 37602 56,635 080 190 - Mid-Tex Gas Division Addition 080.75203 37601 6,315 080 190 - Mid-Tex Gas Division Addition 080.75203 37602 17,052 080 190 - Mid-Tex Gas Division Addition 080.75203 37800 39,787 080 190 - Mid-Tex Gas Division Addition 080.75204 37602 118,367 080 190 - Mid-Tex Gas Division Addition 080.75208 37602 2,930 080 190 - Mid-Tex Gas Division Addition 080.75210 37601 6,264 080 190 - Mid-Tex Gas Division Addition 080.75210 37602 15,661 080 190 - Mid-Tex Gas Division Addition 080.75210 37800 40,718 080 190 - Mid-Tex Gas Division Addition 080.75211 37602 29,256 080 190 - Mid-Tex Gas Division Addition 080.75211 37800 43,836 080 190 - Mid-Tex Gas Division Addition 080.75213 37602 343,980 080 190 - Mid-Tex Gas Division Addition 080.75214 37602 70,096 080 190 - Mid-Tex Gas Division Addition 080.75214 37800 46,731 080 190 - Mid-Tex Gas Division Addition 080.75215 37602 31,919 080 190 - Mid-Tex Gas Division Addition 080.75215 37800 47,879 080 190 - Mid-Tex Gas Division Addition 080.75216 37601 6,319 080 190 - Mid-Tex Gas Division Addition 080.75216 37602 17,061 080 190 - Mid-Tex Gas Division Addition 080.75216 37800 39,809 080 190 - Mid-Tex Gas Division Addition 080.75217 37600 29,997 080 190 - Mid-Tex Gas Division Addition 080.75219 37602 188,329 080 190 - Mid-Tex Gas Division Addition 080.75219 37800 62,776 080 190 - Mid-Tex Gas Division Addition 080.75219 38000 167,404 080 190 - Mid-Tex Gas Division Addition 080.75221 37601 7,456 080 190 - Mid-Tex Gas Division Addition 080.75221 37602 9,941 080 190 - Mid-Tex Gas Division Addition 080.75221 37800 44,734 080 190 - Mid-Tex Gas Division Addition 080.75222 37602 74,113 080 190 - Mid-Tex Gas Division Addition 080.75225 37602 100,609 080 190 - Mid-Tex Gas Division Addition 080.75227 37601 7,961 080 190 - Mid-Tex Gas Division Addition 080.75227 37602 21,495 080 190 - Mid-Tex Gas Division Addition 080.75227 37800 50,155 080 190 - Mid-Tex Gas Division Addition 080.75228 37602 975,368 080 190 - Mid-Tex Gas Division Addition 080.75228 38000 51,335 080 190 - Mid-Tex Gas Division Addition 080.75229 37602 222,447 080 190 - Mid-Tex Gas Division Addition 080.75233 37602 290,967 080 190 - Mid-Tex Gas Division Addition 080.75236 37601 6,415 080 190 - Mid-Tex Gas Division Addition 080.75236 37602 64,148 080 190 - Mid-Tex Gas Division Addition 080.75236 37800 57,618 080 190 - Mid-Tex Gas Division Addition 080.75239 37601 20,349 080 190 - Mid-Tex Gas Division Addition 080.75239 37602 32,559 080 190 - Mid-Tex Gas Division Addition 080.75239 37800 48,838 080 190 - Mid-Tex Gas Division Addition 080.75243 37601 23,875 080 190 - Mid-Tex Gas Division Addition 080.75243 37602 11,938 080 190 - Mid-Tex Gas Division Addition 080.75243 37800 83,563 080 190 - Mid-Tex Gas Division Addition 080.75248 37602 17,656 080 190 - Mid-Tex Gas Division Addition 080.75251 37602 39,003 080 190 - Mid-Tex Gas Division Addition 080.75251 37800 31,912 080 190 - Mid-Tex Gas Division Addition 080.75254 37602 42,742 080 190 - Mid-Tex Gas Division Addition 080.75256 37602 52,003 080 190 - Mid-Tex Gas Division Addition 080.75256 37800 52,003 080 190 - Mid-Tex Gas Division Addition 080.75259 37602 708,893 080 190 - Mid-Tex Gas Division Addition 080.75259 38000 303,811 080 190 - Mid-Tex Gas Division Addition 080.75260 37602 80,041 080 190 - Mid-Tex Gas Division Addition 080.75261 37602 688,018 080 190 - Mid-Tex Gas Division Addition 080.75261 38000 458,678 080 190 - Mid-Tex Gas Division Addition 080.75262 37602 113,015 080 190 - Mid-Tex Gas Division Addition 080.75263 37602 163,232 080 190 - Mid-Tex Gas Division Addition 080.75263 38000 40,808 080 190 - Mid-Tex Gas Division Addition 080.75270 37602 2,547 080 190 - Mid-Tex Gas Division Addition 080.75273 37601 4,176 080 190 - Mid-Tex Gas Division Addition 080.75274 37602 11,802 080 190 - Mid-Tex Gas Division Addition 080.75276 37602 476,685 080 190 - Mid-Tex Gas Division Addition 080.75276 38000 317,790 080 190 - Mid-Tex Gas Division Addition 080.75278 37602 434,220 080 190 - Mid-Tex Gas Division Addition 080.75278 38000 15,283 080 190 - Mid-Tex Gas Division Addition 080.75279 37602 336,900 080 190 - Mid-Tex Gas Division Addition 080.75279 38000 13,308 MTX Additions by FERC Page 83 of 101 481 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.75280 37602 307,964 080 190 - Mid-Tex Gas Division Addition 080.75280 38000 251,971 080 190 - Mid-Tex Gas Division Addition 080.75281 37602 377,480 080 190 - Mid-Tex Gas Division Addition 080.75281 38000 14,097 080 190 - Mid-Tex Gas Division Addition 080.75286 37602 10,997 080 190 - Mid-Tex Gas Division Addition 080.75289 37602 22,680 080 190 - Mid-Tex Gas Division Addition 080.75293 37602 132,044 080 190 - Mid-Tex Gas Division Addition 080.75299 37602 715,915 080 190 - Mid-Tex Gas Division Addition 080.75301 37602 322,247 080 190 - Mid-Tex Gas Division Addition 080.75301 38000 16,960 080 190 - Mid-Tex Gas Division Addition 080.75303 37602 252 080 190 - Mid-Tex Gas Division Addition 080.75313 37602 1,370 080 190 - Mid-Tex Gas Division Addition 080.75313 38100 60,070 080 190 - Mid-Tex Gas Division Addition 080.75314 37602 351,388 080 190 - Mid-Tex Gas Division Addition 080.75314 38000 123,461 080 190 - Mid-Tex Gas Division Addition 080.75315 37602 58,774 080 190 - Mid-Tex Gas Division Addition 080.75315 37800 48,087 080 190 - Mid-Tex Gas Division Addition 080.75317 37602 31,212 080 190 - Mid-Tex Gas Division Addition 080.75318 37602 29,977 080 190 - Mid-Tex Gas Division Addition 080.75319 38000 301 080 190 - Mid-Tex Gas Division Addition 080.75321 37601 4,928 080 190 - Mid-Tex Gas Division Addition 080.75321 37602 49,281 080 190 - Mid-Tex Gas Division Addition 080.75321 37800 44,334 080 190 - Mid-Tex Gas Division Addition 080.75322 39000 - 080 190 - Mid-Tex Gas Division Addition 080.75327 37601 (22,688) 080 190 - Mid-Tex Gas Division Addition 080.75328 37602 283,010 080 190 - Mid-Tex Gas Division Addition 080.75330 37602 15,662 080 190 - Mid-Tex Gas Division Addition 080.75334 37602 (42) 080 190 - Mid-Tex Gas Division Addition 080.75335 37602 495,248 080 190 - Mid-Tex Gas Division Addition 080.75336 37602 1,382 080 190 - Mid-Tex Gas Division Addition 080.75341 37602 85,427 080 190 - Mid-Tex Gas Division Addition 080.75341 38000 54,617 080 190 - Mid-Tex Gas Division Addition 080.75342 37602 189,608 080 190 - Mid-Tex Gas Division Addition 080.75342 38000 33,460 080 190 - Mid-Tex Gas Division Addition 080.75343 37602 108,072 080 190 - Mid-Tex Gas Division Addition 080.75343 38000 32,281 080 190 - Mid-Tex Gas Division Addition 080.75351 37602 3,361 080 190 - Mid-Tex Gas Division Addition 080.75354 37602 204,251 080 190 - Mid-Tex Gas Division Addition 080.75354 38000 20,201 080 190 - Mid-Tex Gas Division Addition 080.75356 37602 403,584 080 190 - Mid-Tex Gas Division Addition 080.75356 38000 100,896 080 190 - Mid-Tex Gas Division Addition 080.75357 39000 - 080 190 - Mid-Tex Gas Division Addition 080.75359 37602 140,415 080 190 - Mid-Tex Gas Division Addition 080.75367 37602 22,405 080 190 - Mid-Tex Gas Division Addition 080.75367 37800 67,215 080 190 - Mid-Tex Gas Division Addition 080.75368 37602 409,208 080 190 - Mid-Tex Gas Division Addition 080.75368 38000 45,468 080 190 - Mid-Tex Gas Division Addition 080.75369 37602 450,615 080 190 - Mid-Tex Gas Division Addition 080.75370 37602 31,961 080 190 - Mid-Tex Gas Division Addition 080.75378 37602 15,177 080 190 - Mid-Tex Gas Division Addition 080.75379 37602 209,553 080 190 - Mid-Tex Gas Division Addition 080.75379 37800 26,194 080 190 - Mid-Tex Gas Division Addition 080.75379 38000 26,194 080 190 - Mid-Tex Gas Division Addition 080.75380 37602 69,209 080 190 - Mid-Tex Gas Division Addition 080.75380 37800 56,626 080 190 - Mid-Tex Gas Division Addition 080.75381 37602 127,052 080 190 - Mid-Tex Gas Division Addition 080.75381 37800 127,052 080 190 - Mid-Tex Gas Division Addition 080.75383 37602 46,917 080 190 - Mid-Tex Gas Division Addition 080.75383 37800 57,343 080 190 - Mid-Tex Gas Division Addition 080.75384 37602 (14,122) 080 190 - Mid-Tex Gas Division Addition 080.75392 37600 101,745 080 190 - Mid-Tex Gas Division Addition 080.75393 38000 1,581 080 190 - Mid-Tex Gas Division Addition 080.75396 37602 67,335 080 190 - Mid-Tex Gas Division Addition 080.75398 37602 338,334 080 190 - Mid-Tex Gas Division Addition 080.75398 38000 59,706 080 190 - Mid-Tex Gas Division Addition 080.75399 37602 144,805 080 190 - Mid-Tex Gas Division Addition 080.75399 37800 199,107 080 190 - Mid-Tex Gas Division Addition 080.75399 38000 18,101 080 190 - Mid-Tex Gas Division Addition 080.75400 37602 481,056 080 190 - Mid-Tex Gas Division Addition 080.75400 38000 197,694 080 190 - Mid-Tex Gas Division Addition 080.75402 37602 192,330 080 190 - Mid-Tex Gas Division Addition 080.75402 38000 103,562 080 190 - Mid-Tex Gas Division Addition 080.75404 37602 338,543 080 190 - Mid-Tex Gas Division Addition 080.75404 38000 50,587 080 190 - Mid-Tex Gas Division Addition 080.75408 37602 276,816 080 190 - Mid-Tex Gas Division Addition 080.75408 38000 20,836 080 190 - Mid-Tex Gas Division Addition 080.75409 37602 193,217 080 190 - Mid-Tex Gas Division Addition 080.75409 38000 128,812 080 190 - Mid-Tex Gas Division Addition 080.75411 37602 383,952 080 190 - Mid-Tex Gas Division Addition 080.75411 38000 95,988 080 190 - Mid-Tex Gas Division Addition 080.75413 37602 192,315 080 190 - Mid-Tex Gas Division Addition 080.75413 38000 21,368 080 190 - Mid-Tex Gas Division Addition 080.75421 37602 100,686 080 190 - Mid-Tex Gas Division Addition 080.75425 37602 259,073 080 190 - Mid-Tex Gas Division Addition 080.75428 37602 6,169 080 190 - Mid-Tex Gas Division Addition 080.75428 38000 685 080 190 - Mid-Tex Gas Division Addition 080.75430 37602 110,596 080 190 - Mid-Tex Gas Division Addition 080.75440 37602 26,884 080 190 - Mid-Tex Gas Division Addition 080.75440 38000 1,415 080 190 - Mid-Tex Gas Division Addition 080.75442 38000 (7) 080 190 - Mid-Tex Gas Division Addition 080.75445 37602 177,989 080 190 - Mid-Tex Gas Division Addition 080.75446 37800 8,472 080 190 - Mid-Tex Gas Division Addition 080.75447 37800 9,156 080 190 - Mid-Tex Gas Division Addition 080.75454 37601 - 080 190 - Mid-Tex Gas Division Addition 080.75454 37602 77,083 080 190 - Mid-Tex Gas Division Addition 080.75459 37602 531,767 080 190 - Mid-Tex Gas Division Addition 080.75459 38000 177,256 080 190 - Mid-Tex Gas Division Addition 080.75461 37602 (57,515) 080 190 - Mid-Tex Gas Division Addition 080.75464 37601 6,956 080 190 - Mid-Tex Gas Division Addition 080.75464 37602 31,303 080 190 - Mid-Tex Gas Division Addition 080.75464 37800 31,303 080 190 - Mid-Tex Gas Division Addition 080.75465 37601 3,373 080 190 - Mid-Tex Gas Division Addition 080.75465 37602 30,355 080 190 - Mid-Tex Gas Division Addition 080.75465 37800 37,100 080 190 - Mid-Tex Gas Division Addition 080.75466 37602 141,460 080 190 - Mid-Tex Gas Division Addition 080.75466 37800 141,461 080 190 - Mid-Tex Gas Division Addition 080.75473 37602 155,231 MTX Additions by FERC Page 84 of 101 482 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.75473 38000 3,168 080 190 - Mid-Tex Gas Division Addition 080.75483 38100 175,283 080 190 - Mid-Tex Gas Division Addition 080.75485 37601 5,744 080 190 - Mid-Tex Gas Division Addition 080.75485 37602 63,180 080 190 - Mid-Tex Gas Division Addition 080.75485 37800 45,954 080 190 - Mid-Tex Gas Division Addition 080.75486 37602 163,824 080 190 - Mid-Tex Gas Division Addition 080.75486 38000 18,203 080 190 - Mid-Tex Gas Division Addition 080.75488 37602 272,194 080 190 - Mid-Tex Gas Division Addition 080.75488 37800 32,023 080 190 - Mid-Tex Gas Division Addition 080.75488 38000 16,011 080 190 - Mid-Tex Gas Division Addition 080.75489 37601 6,478 080 190 - Mid-Tex Gas Division Addition 080.75489 37602 71,254 080 190 - Mid-Tex Gas Division Addition 080.75489 37800 51,821 080 190 - Mid-Tex Gas Division Addition 080.75490 37602 155,160 080 190 - Mid-Tex Gas Division Addition 080.75490 38000 66,497 080 190 - Mid-Tex Gas Division Addition 080.75493 37601 8,641 080 190 - Mid-Tex Gas Division Addition 080.75493 37602 38,883 080 190 - Mid-Tex Gas Division Addition 080.75493 37800 38,851 080 190 - Mid-Tex Gas Division Addition 080.75499 37602 3,064 080 190 - Mid-Tex Gas Division Addition 080.75504 37602 14,969 080 190 - Mid-Tex Gas Division Addition 080.75505 37602 27,262 080 190 - Mid-Tex Gas Division Addition 080.75506 37602 58,473 080 190 - Mid-Tex Gas Division Addition 080.75507 37602 970,066 080 190 - Mid-Tex Gas Division Addition 080.75507 38000 323,355 080 190 - Mid-Tex Gas Division Addition 080.75508 37602 32,289 080 190 - Mid-Tex Gas Division Addition 080.75509 37602 28,396 080 190 - Mid-Tex Gas Division Addition 080.75509 38000 2 080 190 - Mid-Tex Gas Division Addition 080.75515 39903 4,867 080 190 - Mid-Tex Gas Division Addition 080.75517 37602 2,291 080 190 - Mid-Tex Gas Division Addition 080.75520 37602 59,858 080 190 - Mid-Tex Gas Division Addition 080.75520 38000 1,222 080 190 - Mid-Tex Gas Division Addition 080.75521 39400 4,782 080 190 - Mid-Tex Gas Division Addition 080.75525 37602 46,035 080 190 - Mid-Tex Gas Division Addition 080.75529 37602 360,252 080 190 - Mid-Tex Gas Division Addition 080.75541 37602 161,563 080 190 - Mid-Tex Gas Division Addition 080.75541 38000 15,979 080 190 - Mid-Tex Gas Division Addition 080.75547 37602 345,810 080 190 - Mid-Tex Gas Division Addition 080.75547 38000 186,205 080 190 - Mid-Tex Gas Division Addition 080.75551 37602 445,701 080 190 - Mid-Tex Gas Division Addition 080.75552 37602 31,872 080 190 - Mid-Tex Gas Division Addition 080.75556 37601 5,922 080 190 - Mid-Tex Gas Division Addition 080.75556 37602 32,570 080 190 - Mid-Tex Gas Division Addition 080.75556 37800 20,727 080 190 - Mid-Tex Gas Division Addition 080.75557 37602 3,644 080 190 - Mid-Tex Gas Division Addition 080.75558 37602 78,222 080 190 - Mid-Tex Gas Division Addition 080.75558 37800 64,000 080 190 - Mid-Tex Gas Division Addition 080.75559 37602 28,085 080 190 - Mid-Tex Gas Division Addition 080.75560 37602 585,488 080 190 - Mid-Tex Gas Division Addition 080.75560 38000 103,321 080 190 - Mid-Tex Gas Division Addition 080.75561 37602 (19,523) 080 190 - Mid-Tex Gas Division Addition 080.75562 37601 7,536 080 190 - Mid-Tex Gas Division Addition 080.75562 37602 41,446 080 190 - Mid-Tex Gas Division Addition 080.75562 37800 26,375 080 190 - Mid-Tex Gas Division Addition 080.75563 37601 7,362 080 190 - Mid-Tex Gas Division Addition 080.75563 37602 40,489 080 190 - Mid-Tex Gas Division Addition 080.75563 37800 25,765 080 190 - Mid-Tex Gas Division Addition 080.75565 37602 18,733 080 190 - Mid-Tex Gas Division Addition 080.75565 37800 18,733 080 190 - Mid-Tex Gas Division Addition 080.75567 38000 747,770 080 190 - Mid-Tex Gas Division Addition 080.75571 38000 178,350 080 190 - Mid-Tex Gas Division Addition 080.75574 37602 298,003 080 190 - Mid-Tex Gas Division Addition 080.75575 37602 368,469 080 190 - Mid-Tex Gas Division Addition 080.75575 38000 40,941 080 190 - Mid-Tex Gas Division Addition 080.75578 37602 529,213 080 190 - Mid-Tex Gas Division Addition 080.75578 38000 132,303 080 190 - Mid-Tex Gas Division Addition 080.75579 37602 77,408 080 190 - Mid-Tex Gas Division Addition 080.75580 37602 566,123 080 190 - Mid-Tex Gas Division Addition 080.75581 38000 3,099 080 190 - Mid-Tex Gas Division Addition 080.75582 39000 75 080 190 - Mid-Tex Gas Division Addition 080.75584 37602 143,923 080 190 - Mid-Tex Gas Division Addition 080.75585 37602 7,016 080 190 - Mid-Tex Gas Division Addition 080.75587 37602 135,030 080 190 - Mid-Tex Gas Division Addition 080.75588 37602 23,533 080 190 - Mid-Tex Gas Division Addition 080.75589 37602 213,591 080 190 - Mid-Tex Gas Division Addition 080.75598 37602 587,566 080 190 - Mid-Tex Gas Division Addition 080.75598 38000 146,891 080 190 - Mid-Tex Gas Division Addition 080.75600 37602 49,720 080 190 - Mid-Tex Gas Division Addition 080.75601 37800 28,520 080 190 - Mid-Tex Gas Division Addition 080.75604 37602 70,723 080 190 - Mid-Tex Gas Division Addition 080.75605 38000 696,725 080 190 - Mid-Tex Gas Division Addition 080.75606 37602 125,440 080 190 - Mid-Tex Gas Division Addition 080.75606 38000 6,602 080 190 - Mid-Tex Gas Division Addition 080.75608 37602 459,369 080 190 - Mid-Tex Gas Division Addition 080.75608 38000 153,123 080 190 - Mid-Tex Gas Division Addition 080.75615 37602 48,944 080 190 - Mid-Tex Gas Division Addition 080.75618 37602 587,621 080 190 - Mid-Tex Gas Division Addition 080.75618 38000 276,527 080 190 - Mid-Tex Gas Division Addition 080.75620 37602 52,220 080 190 - Mid-Tex Gas Division Addition 080.75624 37602 291,513 080 190 - Mid-Tex Gas Division Addition 080.75624 38000 156,968 080 190 - Mid-Tex Gas Division Addition 080.75625 37602 211,379 080 190 - Mid-Tex Gas Division Addition 080.75625 38000 246,609 080 190 - Mid-Tex Gas Division Addition 080.75628 37602 212,192 080 190 - Mid-Tex Gas Division Addition 080.75628 38000 4,330 080 190 - Mid-Tex Gas Division Addition 080.75629 37602 146,551 080 190 - Mid-Tex Gas Division Addition 080.75630 39400 1,759 080 190 - Mid-Tex Gas Division Addition 080.75635 37602 128,663 080 190 - Mid-Tex Gas Division Addition 080.75640 37602 19,783 080 190 - Mid-Tex Gas Division Addition 080.75642 37602 378,671 080 190 - Mid-Tex Gas Division Addition 080.75642 38000 66,824 080 190 - Mid-Tex Gas Division Addition 080.75644 37602 5,826 080 190 - Mid-Tex Gas Division Addition 080.75646 37602 253,462 080 190 - Mid-Tex Gas Division Addition 080.75647 37602 1,027,897 080 190 - Mid-Tex Gas Division Addition 080.75647 38000 440,527 080 190 - Mid-Tex Gas Division Addition 080.75648 37602 876,688 080 190 - Mid-Tex Gas Division Addition 080.75648 38000 154,710 080 190 - Mid-Tex Gas Division Addition 080.75649 37602 69,363 MTX Additions by FERC Page 85 of 101 483 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.75649 38000 1,416 080 190 - Mid-Tex Gas Division Addition 080.75650 37602 666,689 080 190 - Mid-Tex Gas Division Addition 080.75650 38000 117,651 080 190 - Mid-Tex Gas Division Addition 080.75651 37602 989,742 080 190 - Mid-Tex Gas Division Addition 080.75651 38000 247,436 080 190 - Mid-Tex Gas Division Addition 080.75653 37602 984,685 080 190 - Mid-Tex Gas Division Addition 080.75653 38000 328,228 080 190 - Mid-Tex Gas Division Addition 080.75654 37602 15,540 080 190 - Mid-Tex Gas Division Addition 080.75656 37602 428,975 080 190 - Mid-Tex Gas Division Addition 080.75656 38000 75,701 080 190 - Mid-Tex Gas Division Addition 080.75657 37602 80,346 080 190 - Mid-Tex Gas Division Addition 080.75658 37602 454,162 080 190 - Mid-Tex Gas Division Addition 080.75658 38000 119,218 080 190 - Mid-Tex Gas Division Addition 080.75660 37602 31,952 080 190 - Mid-Tex Gas Division Addition 080.75666 37602 480,081 080 190 - Mid-Tex Gas Division Addition 080.75672 37602 54,004 080 190 - Mid-Tex Gas Division Addition 080.75676 37602 8,083 080 190 - Mid-Tex Gas Division Addition 080.75682 38000 26,242 080 190 - Mid-Tex Gas Division Addition 080.75682 38500 4,631 080 190 - Mid-Tex Gas Division Addition 080.75690 37602 419,197 080 190 - Mid-Tex Gas Division Addition 080.75694 37602 180,780 080 190 - Mid-Tex Gas Division Addition 080.75698 37602 672,812 080 190 - Mid-Tex Gas Division Addition 080.75698 38000 36,008 080 190 - Mid-Tex Gas Division Addition 080.75702 37602 35,995 080 190 - Mid-Tex Gas Division Addition 080.75705 37602 346,501 080 190 - Mid-Tex Gas Division Addition 080.75705 38000 97,731 080 190 - Mid-Tex Gas Division Addition 080.75706 37601 9,393 080 190 - Mid-Tex Gas Division Addition 080.75706 37602 84,533 080 190 - Mid-Tex Gas Division Addition 080.75709 37602 17,425 080 190 - Mid-Tex Gas Division Addition 080.75712 37602 379,221 080 190 - Mid-Tex Gas Division Addition 080.75712 38000 42,136 080 190 - Mid-Tex Gas Division Addition 080.75713 39906 220,761 080 190 - Mid-Tex Gas Division Addition 080.75716 37601 25,600 080 190 - Mid-Tex Gas Division Addition 080.75716 37602 68,267 080 190 - Mid-Tex Gas Division Addition 080.75716 37800 76,830 080 190 - Mid-Tex Gas Division Addition 080.75717 37601 16,102 080 190 - Mid-Tex Gas Division Addition 080.75717 37602 80,509 080 190 - Mid-Tex Gas Division Addition 080.75717 37800 64,408 080 190 - Mid-Tex Gas Division Addition 080.75720 37602 101,846 080 190 - Mid-Tex Gas Division Addition 080.75720 38000 5,360 080 190 - Mid-Tex Gas Division Addition 080.75722 37602 121,383 080 190 - Mid-Tex Gas Division Addition 080.75722 38000 21,421 080 190 - Mid-Tex Gas Division Addition 080.75723 37602 222,920 080 190 - Mid-Tex Gas Division Addition 080.75723 38000 95,537 080 190 - Mid-Tex Gas Division Addition 080.75725 37800 59,921 080 190 - Mid-Tex Gas Division Addition 080.75728 37602 214,134 080 190 - Mid-Tex Gas Division Addition 080.75728 38000 52,873 080 190 - Mid-Tex Gas Division Addition 080.75729 37602 397,998 080 190 - Mid-Tex Gas Division Addition 080.75729 38000 70,235 080 190 - Mid-Tex Gas Division Addition 080.75730 37601 51,188 080 190 - Mid-Tex Gas Division Addition 080.75730 37602 204,750 080 190 - Mid-Tex Gas Division Addition 080.75730 38000 85,313 080 190 - Mid-Tex Gas Division Addition 080.75731 37602 162,371 080 190 - Mid-Tex Gas Division Addition 080.75731 38000 54,124 080 190 - Mid-Tex Gas Division Addition 080.75736 37602 273,056 080 190 - Mid-Tex Gas Division Addition 080.75736 38000 117,024 080 190 - Mid-Tex Gas Division Addition 080.75742 37602 64,687 080 190 - Mid-Tex Gas Division Addition 080.75742 38000 11,415 080 190 - Mid-Tex Gas Division Addition 080.75745 37602 23,449 080 190 - Mid-Tex Gas Division Addition 080.75746 37602 796,557 080 190 - Mid-Tex Gas Division Addition 080.75747 37602 14,369 080 190 - Mid-Tex Gas Division Addition 080.75748 37602 45,060 080 190 - Mid-Tex Gas Division Addition 080.75750 37602 40,169 080 190 - Mid-Tex Gas Division Addition 080.75750 37800 49,096 080 190 - Mid-Tex Gas Division Addition 080.75751 37602 12,922 080 190 - Mid-Tex Gas Division Addition 080.75752 37602 219,535 080 190 - Mid-Tex Gas Division Addition 080.75752 38000 54,884 080 190 - Mid-Tex Gas Division Addition 080.75753 37602 572,829 080 190 - Mid-Tex Gas Division Addition 080.75753 38000 23,868 080 190 - Mid-Tex Gas Division Addition 080.75754 37602 436,081 080 190 - Mid-Tex Gas Division Addition 080.75754 38000 43,129 080 190 - Mid-Tex Gas Division Addition 080.75756 37602 79,991 080 190 - Mid-Tex Gas Division Addition 080.75758 37602 171,135 080 190 - Mid-Tex Gas Division Addition 080.75758 37800 9,508 080 190 - Mid-Tex Gas Division Addition 080.75758 38000 9,508 080 190 - Mid-Tex Gas Division Addition 080.75759 38100 1,411,727 080 190 - Mid-Tex Gas Division Addition 080.75762 37601 70,572 080 190 - Mid-Tex Gas Division Addition 080.75769 37602 200,684 080 190 - Mid-Tex Gas Division Addition 080.75769 38000 32,670 080 190 - Mid-Tex Gas Division Addition 080.75770 37602 237,802 080 190 - Mid-Tex Gas Division Addition 080.75770 38000 237,802 080 190 - Mid-Tex Gas Division Addition 080.75772 37602 16,947 080 190 - Mid-Tex Gas Division Addition 080.75773 37602 9,167 080 190 - Mid-Tex Gas Division Addition 080.75777 37602 186,336 080 190 - Mid-Tex Gas Division Addition 080.75777 38000 32,883 080 190 - Mid-Tex Gas Division Addition 080.75778 37602 9,595 080 190 - Mid-Tex Gas Division Addition 080.75778 38000 - 080 190 - Mid-Tex Gas Division Addition 080.75780 37602 624,058 080 190 - Mid-Tex Gas Division Addition 080.75780 38000 69,340 080 190 - Mid-Tex Gas Division Addition 080.75782 37602 28,135 080 190 - Mid-Tex Gas Division Addition 080.75782 38000 9,379 080 190 - Mid-Tex Gas Division Addition 080.75784 37800 6,183 080 190 - Mid-Tex Gas Division Addition 080.75785 37602 101,606 080 190 - Mid-Tex Gas Division Addition 080.75786 37602 356,921 080 190 - Mid-Tex Gas Division Addition 080.75786 38000 106,613 080 190 - Mid-Tex Gas Division Addition 080.75787 37602 229,206 080 190 - Mid-Tex Gas Division Addition 080.75788 37602 393,431 080 190 - Mid-Tex Gas Division Addition 080.75788 38000 69,429 080 190 - Mid-Tex Gas Division Addition 080.75789 39400 6,295 080 190 - Mid-Tex Gas Division Addition 080.75790 39400 5,621 080 190 - Mid-Tex Gas Division Addition 080.75791 37602 389,339 080 190 - Mid-Tex Gas Division Addition 080.75791 38000 20,492 080 190 - Mid-Tex Gas Division Addition 080.75796 37602 6,186 080 190 - Mid-Tex Gas Division Addition 080.75797 37602 12,496 080 190 - Mid-Tex Gas Division Addition 080.75799 37602 396,975 080 190 - Mid-Tex Gas Division Addition 080.75799 37800 46,703 080 190 - Mid-Tex Gas Division Addition 080.75799 38000 23,352 MTX Additions by FERC Page 86 of 101 484 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.75801 37602 15,289 080 190 - Mid-Tex Gas Division Addition 080.75803 37602 5,165 080 190 - Mid-Tex Gas Division Addition 080.75804 37600 26,179 080 190 - Mid-Tex Gas Division Addition 080.75805 37602 20,887 080 190 - Mid-Tex Gas Division Addition 080.75806 37602 329,340 080 190 - Mid-Tex Gas Division Addition 080.75806 38000 58,119 080 190 - Mid-Tex Gas Division Addition 080.75807 37602 148,746 080 190 - Mid-Tex Gas Division Addition 080.75807 38000 99,164 080 190 - Mid-Tex Gas Division Addition 080.75808 37602 35,823 080 190 - Mid-Tex Gas Division Addition 080.75812 37602 14,987 080 190 - Mid-Tex Gas Division Addition 080.75813 39400 3,136 080 190 - Mid-Tex Gas Division Addition 080.75814 37602 15,604 080 190 - Mid-Tex Gas Division Addition 080.75815 37602 (1,681) 080 190 - Mid-Tex Gas Division Addition 080.75816 37602 10,688 080 190 - Mid-Tex Gas Division Addition 080.75817 39400 6,295 080 190 - Mid-Tex Gas Division Addition 080.75818 37602 20,664 080 190 - Mid-Tex Gas Division Addition 080.75819 39400 4,807 080 190 - Mid-Tex Gas Division Addition 080.75821 37602 131,785 080 190 - Mid-Tex Gas Division Addition 080.75821 38000 32,946 080 190 - Mid-Tex Gas Division Addition 080.75822 37602 23,639 080 190 - Mid-Tex Gas Division Addition 080.75825 37602 76,108 080 190 - Mid-Tex Gas Division Addition 080.75826 37602 183,457 080 190 - Mid-Tex Gas Division Addition 080.75827 37602 16,017 080 190 - Mid-Tex Gas Division Addition 080.75827 37800 64,066 080 190 - Mid-Tex Gas Division Addition 080.75828 37602 103,194 080 190 - Mid-Tex Gas Division Addition 080.75828 37800 485,617 080 190 - Mid-Tex Gas Division Addition 080.75828 38000 18,211 080 190 - Mid-Tex Gas Division Addition 080.75829 37602 16,674 080 190 - Mid-Tex Gas Division Addition 080.75829 38000 - 080 190 - Mid-Tex Gas Division Addition 080.75830 37602 51,534 080 190 - Mid-Tex Gas Division Addition 080.75830 37800 88,344 080 190 - Mid-Tex Gas Division Addition 080.75830 38000 7,362 080 190 - Mid-Tex Gas Division Addition 080.75833 37602 278,655 080 190 - Mid-Tex Gas Division Addition 080.75833 37800 5,866 080 190 - Mid-Tex Gas Division Addition 080.75833 38000 8,800 080 190 - Mid-Tex Gas Division Addition 080.75842 37602 19,702 080 190 - Mid-Tex Gas Division Addition 080.75845 37602 25,674 080 190 - Mid-Tex Gas Division Addition 080.75847 37602 35,770 080 190 - Mid-Tex Gas Division Addition 080.75852 37602 21,486 080 190 - Mid-Tex Gas Division Addition 080.75854 37602 453,196 080 190 - Mid-Tex Gas Division Addition 080.75856 39000 19,383 080 190 - Mid-Tex Gas Division Addition 080.75857 37602 4,875 080 190 - Mid-Tex Gas Division Addition 080.75858 37602 75,597 080 190 - Mid-Tex Gas Division Addition 080.75859 37602 309,861 080 190 - Mid-Tex Gas Division Addition 080.75859 37800 13,772 080 190 - Mid-Tex Gas Division Addition 080.75859 38000 20,657 080 190 - Mid-Tex Gas Division Addition 080.75860 37602 304,936 080 190 - Mid-Tex Gas Division Addition 080.75860 38000 53,812 080 190 - Mid-Tex Gas Division Addition 080.75863 37602 234,221 080 190 - Mid-Tex Gas Division Addition 080.75863 38000 41,333 080 190 - Mid-Tex Gas Division Addition 080.75864 37602 15,520 080 190 - Mid-Tex Gas Division Addition 080.75867 37602 60,171 080 190 - Mid-Tex Gas Division Addition 080.75870 37602 41,660 080 190 - Mid-Tex Gas Division Addition 080.75870 38000 2,193 080 190 - Mid-Tex Gas Division Addition 080.75875 37602 3,658 080 190 - Mid-Tex Gas Division Addition 080.75876 37602 201,686 080 190 - Mid-Tex Gas Division Addition 080.75878 39000 16,407 080 190 - Mid-Tex Gas Division Addition 080.75883 37602 32,186 080 190 - Mid-Tex Gas Division Addition 080.75883 37800 59,774 080 190 - Mid-Tex Gas Division Addition 080.75887 39004 87,235 080 190 - Mid-Tex Gas Division Addition 080.75890 39906 20,226 080 190 - Mid-Tex Gas Division Addition 080.75894 37602 60,609 080 190 - Mid-Tex Gas Division Addition 080.75900 37602 5,616 080 190 - Mid-Tex Gas Division Addition 080.75901 37602 19,186 080 190 - Mid-Tex Gas Division Addition 080.75907 37602 107,687 080 190 - Mid-Tex Gas Division Addition 080.75908 37602 32,632 080 190 - Mid-Tex Gas Division Addition 080.75908 38000 1,717 080 190 - Mid-Tex Gas Division Addition 080.75909 37602 226,290 080 190 - Mid-Tex Gas Division Addition 080.75909 37800 13,311 080 190 - Mid-Tex Gas Division Addition 080.75909 38000 26,622 080 190 - Mid-Tex Gas Division Addition 080.75910 37602 5,281 080 190 - Mid-Tex Gas Division Addition 080.75911 37602 130,024 080 190 - Mid-Tex Gas Division Addition 080.75915 37601 103,423 080 190 - Mid-Tex Gas Division Addition 080.75917 37602 6,957 080 190 - Mid-Tex Gas Division Addition 080.75918 37602 3,905 080 190 - Mid-Tex Gas Division Addition 080.75919 37602 858,642 080 190 - Mid-Tex Gas Division Addition 080.75919 38000 95,405 080 190 - Mid-Tex Gas Division Addition 080.75921 37602 19,388 080 190 - Mid-Tex Gas Division Addition 080.75922 37602 191,294 080 190 - Mid-Tex Gas Division Addition 080.75924 37602 82,821 080 190 - Mid-Tex Gas Division Addition 080.75924 37800 82,821 080 190 - Mid-Tex Gas Division Addition 080.75924 38000 18,405 080 190 - Mid-Tex Gas Division Addition 080.75925 37602 153,934 080 190 - Mid-Tex Gas Division Addition 080.75925 37800 138,540 080 190 - Mid-Tex Gas Division Addition 080.75925 38000 15,393 080 190 - Mid-Tex Gas Division Addition 080.75932 37602 368,652 080 190 - Mid-Tex Gas Division Addition 080.75932 38000 65,056 080 190 - Mid-Tex Gas Division Addition 080.75933 37602 21,268 080 190 - Mid-Tex Gas Division Addition 080.75933 38000 - 080 190 - Mid-Tex Gas Division Addition 080.75934 39000 14,854 080 190 - Mid-Tex Gas Division Addition 080.75937 37602 1,660 080 190 - Mid-Tex Gas Division Addition 080.75943 39400 6,287 080 190 - Mid-Tex Gas Division Addition 080.75947 37602 12,084 080 190 - Mid-Tex Gas Division Addition 080.75948 37602 2,703 080 190 - Mid-Tex Gas Division Addition 080.75950 37602 13,215 080 190 - Mid-Tex Gas Division Addition 080.75954 37602 11,966 080 190 - Mid-Tex Gas Division Addition 080.75955 39906 47,078 080 190 - Mid-Tex Gas Division Addition 080.75958 37602 99,132 080 190 - Mid-Tex Gas Division Addition 080.75964 37602 336,581 080 190 - Mid-Tex Gas Division Addition 080.75965 37602 64,116 080 190 - Mid-Tex Gas Division Addition 080.75966 37602 197,646 080 190 - Mid-Tex Gas Division Addition 080.75966 38000 197,646 080 190 - Mid-Tex Gas Division Addition 080.75967 37602 232,918 080 190 - Mid-Tex Gas Division Addition 080.75967 38000 25,880 080 190 - Mid-Tex Gas Division Addition 080.75968 37602 710,338 080 190 - Mid-Tex Gas Division Addition 080.75968 38000 262,728 080 190 - Mid-Tex Gas Division Addition 080.75972 37601 134,994 MTX Additions by FERC Page 87 of 101 485 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.75972 37602 231,418 080 190 - Mid-Tex Gas Division Addition 080.75972 38000 19,285 080 190 - Mid-Tex Gas Division Addition 080.75973 39906 167,490 080 190 - Mid-Tex Gas Division Addition 080.75975 37602 68,526 080 190 - Mid-Tex Gas Division Addition 080.75975 38000 3,607 080 190 - Mid-Tex Gas Division Addition 080.75976 37602 118,292 080 190 - Mid-Tex Gas Division Addition 080.75976 38000 6,226 080 190 - Mid-Tex Gas Division Addition 080.75978 37602 25,709 080 190 - Mid-Tex Gas Division Addition 080.75979 37800 74,852 080 190 - Mid-Tex Gas Division Addition 080.75984 39906 253,299 080 190 - Mid-Tex Gas Division Addition 080.75987 37601 126,332 080 190 - Mid-Tex Gas Division Addition 080.75990 37602 86,256 080 190 - Mid-Tex Gas Division Addition 080.75991 39400 5,674 080 190 - Mid-Tex Gas Division Addition 080.75992 39906 286,632 080 190 - Mid-Tex Gas Division Addition 080.75994 37602 77,628 080 190 - Mid-Tex Gas Division Addition 080.75994 37800 54,476 080 190 - Mid-Tex Gas Division Addition 080.75994 38000 4,086 080 190 - Mid-Tex Gas Division Addition 080.75996 37600 68,467 080 190 - Mid-Tex Gas Division Addition 080.76001 37602 436,562 080 190 - Mid-Tex Gas Division Addition 080.76004 37602 69,183 080 190 - Mid-Tex Gas Division Addition 080.76005 39400 5,147 080 190 - Mid-Tex Gas Division Addition 080.76009 37602 1,727 080 190 - Mid-Tex Gas Division Addition 080.76012 37602 139,164 080 190 - Mid-Tex Gas Division Addition 080.76012 38000 15,463 080 190 - Mid-Tex Gas Division Addition 080.76013 37602 581,907 080 190 - Mid-Tex Gas Division Addition 080.76014 39906 43,774 080 190 - Mid-Tex Gas Division Addition 080.76018 37602 68,321 080 190 - Mid-Tex Gas Division Addition 080.76019 37602 23,765 080 190 - Mid-Tex Gas Division Addition 080.76024 37602 91,666 080 190 - Mid-Tex Gas Division Addition 080.76024 37800 30,556 080 190 - Mid-Tex Gas Division Addition 080.76025 37601 13,294 080 190 - Mid-Tex Gas Division Addition 080.76025 37602 39,883 080 190 - Mid-Tex Gas Division Addition 080.76025 37800 79,765 080 190 - Mid-Tex Gas Division Addition 080.76026 37602 98,884 080 190 - Mid-Tex Gas Division Addition 080.76026 38000 3,058 080 190 - Mid-Tex Gas Division Addition 080.76027 37602 785,967 080 190 - Mid-Tex Gas Division Addition 080.76027 38000 87,330 080 190 - Mid-Tex Gas Division Addition 080.76028 37602 171,471 080 190 - Mid-Tex Gas Division Addition 080.76029 37602 1,381 080 190 - Mid-Tex Gas Division Addition 080.76032 37602 24,548 080 190 - Mid-Tex Gas Division Addition 080.76033 37602 317 080 190 - Mid-Tex Gas Division Addition 080.76039 37602 610,111 080 190 - Mid-Tex Gas Division Addition 080.76039 38000 406,741 080 190 - Mid-Tex Gas Division Addition 080.76044 37602 4,696 080 190 - Mid-Tex Gas Division Addition 080.76045 37602 5,854 080 190 - Mid-Tex Gas Division Addition 080.76047 37602 97,399 080 190 - Mid-Tex Gas Division Addition 080.76047 38000 - 080 190 - Mid-Tex Gas Division Addition 080.76052 37602 285,550 080 190 - Mid-Tex Gas Division Addition 080.76055 37602 9,437 080 190 - Mid-Tex Gas Division Addition 080.76056 37602 194,315 080 190 - Mid-Tex Gas Division Addition 080.76064 37602 471,842 080 190 - Mid-Tex Gas Division Addition 080.76065 37602 31,406 080 190 - Mid-Tex Gas Division Addition 080.76065 38100 886 080 190 - Mid-Tex Gas Division Addition 080.76066 37602 303,431 080 190 - Mid-Tex Gas Division Addition 080.76076 37602 22,924 080 190 - Mid-Tex Gas Division Addition 080.76085 37602 224,191 080 190 - Mid-Tex Gas Division Addition 080.76085 38000 56,048 080 190 - Mid-Tex Gas Division Addition 080.76087 37602 38,805 080 190 - Mid-Tex Gas Division Addition 080.76087 37800 47,428 080 190 - Mid-Tex Gas Division Addition 080.76088 37602 92,234 080 190 - Mid-Tex Gas Division Addition 080.76088 37800 199,840 080 190 - Mid-Tex Gas Division Addition 080.76088 38000 15,372 080 190 - Mid-Tex Gas Division Addition 080.76089 37602 47,853 080 190 - Mid-Tex Gas Division Addition 080.76089 37800 71,780 080 190 - Mid-Tex Gas Division Addition 080.76093 37602 564,293 080 190 - Mid-Tex Gas Division Addition 080.76093 38000 141,073 080 190 - Mid-Tex Gas Division Addition 080.76098 37602 963,380 080 190 - Mid-Tex Gas Division Addition 080.76098 38000 107,042 080 190 - Mid-Tex Gas Division Addition 080.76101 37601 12,140 080 190 - Mid-Tex Gas Division Addition 080.76101 37602 48,561 080 190 - Mid-Tex Gas Division Addition 080.76101 37800 60,702 080 190 - Mid-Tex Gas Division Addition 080.76107 37601 141,952 080 190 - Mid-Tex Gas Division Addition 080.76107 37602 101,395 080 190 - Mid-Tex Gas Division Addition 080.76107 37800 162,231 080 190 - Mid-Tex Gas Division Addition 080.76108 37602 34,798 080 190 - Mid-Tex Gas Division Addition 080.76109 37602 303,859 080 190 - Mid-Tex Gas Division Addition 080.76110 37601 338,587 080 190 - Mid-Tex Gas Division Addition 080.76111 37602 96,576 080 190 - Mid-Tex Gas Division Addition 080.76111 38000 32,192 080 190 - Mid-Tex Gas Division Addition 080.76120 37601 12,576 080 190 - Mid-Tex Gas Division Addition 080.76120 37602 37,728 080 190 - Mid-Tex Gas Division Addition 080.76120 37800 75,455 080 190 - Mid-Tex Gas Division Addition 080.76121 37602 56,040 080 190 - Mid-Tex Gas Division Addition 080.76121 38000 5,903 080 190 - Mid-Tex Gas Division Addition 080.76122 37602 96,214 080 190 - Mid-Tex Gas Division Addition 080.76122 38000 10,691 080 190 - Mid-Tex Gas Division Addition 080.76124 39906 3,096 080 190 - Mid-Tex Gas Division Addition 080.76129 37602 18,849 080 190 - Mid-Tex Gas Division Addition 080.76129 38000 1 080 190 - Mid-Tex Gas Division Addition 080.76132 37602 353,539 080 190 - Mid-Tex Gas Division Addition 080.76138 37602 55,009 080 190 - Mid-Tex Gas Division Addition 080.76138 37800 67,236 080 190 - Mid-Tex Gas Division Addition 080.76140 37601 17,397 080 190 - Mid-Tex Gas Division Addition 080.76140 37602 46,391 080 190 - Mid-Tex Gas Division Addition 080.76140 37800 51,801 080 190 - Mid-Tex Gas Division Addition 080.76141 37602 341,595 080 190 - Mid-Tex Gas Division Addition 080.76141 38000 183,936 080 190 - Mid-Tex Gas Division Addition 080.76143 37602 717,998 080 190 - Mid-Tex Gas Division Addition 080.76143 38000 126,706 080 190 - Mid-Tex Gas Division Addition 080.76144 37602 5,509 080 190 - Mid-Tex Gas Division Addition 080.76144 38000 290 080 190 - Mid-Tex Gas Division Addition 080.76145 37602 364,836 080 190 - Mid-Tex Gas Division Addition 080.76149 37602 290,222 080 190 - Mid-Tex Gas Division Addition 080.76149 38000 156,274 080 190 - Mid-Tex Gas Division Addition 080.76150 37602 172,424 080 190 - Mid-Tex Gas Division Addition 080.76150 38000 9,075 080 190 - Mid-Tex Gas Division Addition 080.76151 37602 394,499 MTX Additions by FERC Page 88 of 101 486 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.76151 38000 20,763 080 190 - Mid-Tex Gas Division Addition 080.76154 37602 20,384 080 190 - Mid-Tex Gas Division Addition 080.76160 37800 23,050 080 190 - Mid-Tex Gas Division Addition 080.76161 37602 52,332 080 190 - Mid-Tex Gas Division Addition 080.76161 38000 22,428 080 190 - Mid-Tex Gas Division Addition 080.76166 37602 99,244 080 190 - Mid-Tex Gas Division Addition 080.76166 38000 11,027 080 190 - Mid-Tex Gas Division Addition 080.76168 39906 128,693 080 190 - Mid-Tex Gas Division Addition 080.76173 37602 15,719 080 190 - Mid-Tex Gas Division Addition 080.76174 39400 5,006 080 190 - Mid-Tex Gas Division Addition 080.76176 37602 8,595 080 190 - Mid-Tex Gas Division Addition 080.76176 38000 1 080 190 - Mid-Tex Gas Division Addition 080.76178 37602 2,340 080 190 - Mid-Tex Gas Division Addition 080.76179 39903 1,526 080 190 - Mid-Tex Gas Division Addition 080.76180 39906 283,910 080 190 - Mid-Tex Gas Division Addition 080.76182 37602 3,874 080 190 - Mid-Tex Gas Division Addition 080.76182 38000 39 080 190 - Mid-Tex Gas Division Addition 080.76183 39906 101,145 080 190 - Mid-Tex Gas Division Addition 080.76187 37602 341,515 080 190 - Mid-Tex Gas Division Addition 080.76189 37602 38,966 080 190 - Mid-Tex Gas Division Addition 080.76192 37602 51,313 080 190 - Mid-Tex Gas Division Addition 080.76192 37800 87,965 080 190 - Mid-Tex Gas Division Addition 080.76192 38000 7,330 080 190 - Mid-Tex Gas Division Addition 080.76194 37602 74,142 080 190 - Mid-Tex Gas Division Addition 080.76194 38000 1 080 190 - Mid-Tex Gas Division Addition 080.76198 37602 593,794 080 190 - Mid-Tex Gas Division Addition 080.76198 38000 18,365 080 190 - Mid-Tex Gas Division Addition 080.76199 37602 455,324 080 190 - Mid-Tex Gas Division Addition 080.76199 38000 14,082 080 190 - Mid-Tex Gas Division Addition 080.76200 37602 370,949 080 190 - Mid-Tex Gas Division Addition 080.76200 38000 16,263 080 190 - Mid-Tex Gas Division Addition 080.76201 37602 287,830 080 190 - Mid-Tex Gas Division Addition 080.76201 38000 71,958 080 190 - Mid-Tex Gas Division Addition 080.76202 37602 443,901 080 190 - Mid-Tex Gas Division Addition 080.76202 38000 17,055 080 190 - Mid-Tex Gas Division Addition 080.76205 37602 205,242 080 190 - Mid-Tex Gas Division Addition 080.76210 37602 10,458 080 190 - Mid-Tex Gas Division Addition 080.76216 37602 757,218 080 190 - Mid-Tex Gas Division Addition 080.76217 37602 421,500 080 190 - Mid-Tex Gas Division Addition 080.76217 38000 105,375 080 190 - Mid-Tex Gas Division Addition 080.76230 37602 14,291 080 190 - Mid-Tex Gas Division Addition 080.76234 37602 6,346 080 190 - Mid-Tex Gas Division Addition 080.76235 39400 1,621 080 190 - Mid-Tex Gas Division Addition 080.76242 39000 19,681 080 190 - Mid-Tex Gas Division Addition 080.76243 37602 3,855 080 190 - Mid-Tex Gas Division Addition 080.76248 37800 16,073 080 190 - Mid-Tex Gas Division Addition 080.76249 37602 21,955 080 190 - Mid-Tex Gas Division Addition 080.76250 37602 646,229 080 190 - Mid-Tex Gas Division Addition 080.76250 38000 114,040 080 190 - Mid-Tex Gas Division Addition 080.76252 37602 248,138 080 190 - Mid-Tex Gas Division Addition 080.76256 37602 206,857 080 190 - Mid-Tex Gas Division Addition 080.76256 38000 22,984 080 190 - Mid-Tex Gas Division Addition 080.76258 37602 130,172 080 190 - Mid-Tex Gas Division Addition 080.76259 37602 53,401 080 190 - Mid-Tex Gas Division Addition 080.76259 38000 539 080 190 - Mid-Tex Gas Division Addition 080.76260 37602 251,251 080 190 - Mid-Tex Gas Division Addition 080.76260 38000 44,338 080 190 - Mid-Tex Gas Division Addition 080.76262 37602 148,476 080 190 - Mid-Tex Gas Division Addition 080.76262 38000 63,633 080 190 - Mid-Tex Gas Division Addition 080.76263 37602 222,704 080 190 - Mid-Tex Gas Division Addition 080.76263 38000 55,676 080 190 - Mid-Tex Gas Division Addition 080.76264 37602 287,769 080 190 - Mid-Tex Gas Division Addition 080.76264 38000 67,710 080 190 - Mid-Tex Gas Division Addition 080.76265 37602 232,076 080 190 - Mid-Tex Gas Division Addition 080.76265 38000 99,461 080 190 - Mid-Tex Gas Division Addition 080.76266 37602 387,994 080 190 - Mid-Tex Gas Division Addition 080.76266 38000 43,111 080 190 - Mid-Tex Gas Division Addition 080.76267 37602 199,583 080 190 - Mid-Tex Gas Division Addition 080.76267 38000 35,221 080 190 - Mid-Tex Gas Division Addition 080.76268 37602 170,456 080 190 - Mid-Tex Gas Division Addition 080.76268 38000 30,080 080 190 - Mid-Tex Gas Division Addition 080.76269 37602 126,780 080 190 - Mid-Tex Gas Division Addition 080.76269 38000 68,266 080 190 - Mid-Tex Gas Division Addition 080.76270 37602 215,362 080 190 - Mid-Tex Gas Division Addition 080.76270 38000 38,005 080 190 - Mid-Tex Gas Division Addition 080.76293 37602 75,466 080 190 - Mid-Tex Gas Division Addition 080.76315 37602 816,741 080 190 - Mid-Tex Gas Division Addition 080.76330 37602 233,069 080 190 - Mid-Tex Gas Division Addition 080.76330 38000 25,897 080 190 - Mid-Tex Gas Division Addition 080.76332 37602 478,026 080 190 - Mid-Tex Gas Division Addition 080.76332 38000 95,605 080 190 - Mid-Tex Gas Division Addition 080.76335 37602 913,667 080 190 - Mid-Tex Gas Division Addition 080.76335 38000 161,235 080 190 - Mid-Tex Gas Division Addition 080.76338 37602 595,479 080 190 - Mid-Tex Gas Division Addition 080.76338 38000 148,870 080 190 - Mid-Tex Gas Division Addition 080.76339 37602 229,832 080 190 - Mid-Tex Gas Division Addition 080.76339 38000 45,966 080 190 - Mid-Tex Gas Division Addition 080.76343 37602 282,998 080 190 - Mid-Tex Gas Division Addition 080.76343 38000 70,750 080 190 - Mid-Tex Gas Division Addition 080.76346 37602 180,146 080 190 - Mid-Tex Gas Division Addition 080.76346 38000 45,037 080 190 - Mid-Tex Gas Division Addition 080.76347 37602 172,639 080 190 - Mid-Tex Gas Division Addition 080.76347 38000 43,160 080 190 - Mid-Tex Gas Division Addition 080.76349 37602 347,508 080 190 - Mid-Tex Gas Division Addition 080.76349 38000 86,877 080 190 - Mid-Tex Gas Division Addition 080.76350 37602 196,616 080 190 - Mid-Tex Gas Division Addition 080.76350 38000 10,348 080 190 - Mid-Tex Gas Division Addition 080.76352 37602 35,064 080 190 - Mid-Tex Gas Division Addition 080.76353 39000 17,684 080 190 - Mid-Tex Gas Division Addition 080.76354 37602 347,932 080 190 - Mid-Tex Gas Division Addition 080.76354 38000 18,312 080 190 - Mid-Tex Gas Division Addition 080.76355 39906 11,564 080 190 - Mid-Tex Gas Division Addition 080.76356 37602 375,281 080 190 - Mid-Tex Gas Division Addition 080.76356 38000 61,092 080 190 - Mid-Tex Gas Division Addition 080.76358 37602 6,701 080 190 - Mid-Tex Gas Division Addition 080.76359 37602 4,099 080 190 - Mid-Tex Gas Division Addition 080.76360 37602 53,683 MTX Additions by FERC Page 89 of 101 487 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.76364 37602 (1,880) 080 190 - Mid-Tex Gas Division Addition 080.76366 37602 389,033 080 190 - Mid-Tex Gas Division Addition 080.76368 37602 11,946 080 190 - Mid-Tex Gas Division Addition 080.76370 37601 71,044 080 190 - Mid-Tex Gas Division Addition 080.76371 37602 295,418 080 190 - Mid-Tex Gas Division Addition 080.76371 38000 - 080 190 - Mid-Tex Gas Division Addition 080.76375 37601 17,033 080 190 - Mid-Tex Gas Division Addition 080.76375 37602 44,905 080 190 - Mid-Tex Gas Division Addition 080.76375 37800 92,906 080 190 - Mid-Tex Gas Division Addition 080.76376 38000 740,192 080 190 - Mid-Tex Gas Division Addition 080.76378 37602 54,190 080 190 - Mid-Tex Gas Division Addition 080.76378 38000 2,852 080 190 - Mid-Tex Gas Division Addition 080.76379 37602 544,078 080 190 - Mid-Tex Gas Division Addition 080.76379 38000 233,176 080 190 - Mid-Tex Gas Division Addition 080.76380 37602 4,245 080 190 - Mid-Tex Gas Division Addition 080.76382 37602 356,552 080 190 - Mid-Tex Gas Division Addition 080.76382 38000 3,602 080 190 - Mid-Tex Gas Division Addition 080.76385 39400 1,486 080 190 - Mid-Tex Gas Division Addition 080.76390 37602 491,705 080 190 - Mid-Tex Gas Division Addition 080.76390 38000 327,804 080 190 - Mid-Tex Gas Division Addition 080.76392 39906 2,395 080 190 - Mid-Tex Gas Division Addition 080.76394 37602 40,437 080 190 - Mid-Tex Gas Division Addition 080.76398 37602 3,595 080 190 - Mid-Tex Gas Division Addition 080.76402 37602 275,676 080 190 - Mid-Tex Gas Division Addition 080.76402 38000 68,919 080 190 - Mid-Tex Gas Division Addition 080.76405 37602 2,097 080 190 - Mid-Tex Gas Division Addition 080.76407 37602 15,867 080 190 - Mid-Tex Gas Division Addition 080.76408 37602 31,141 080 190 - Mid-Tex Gas Division Addition 080.76419 37602 206,274 080 190 - Mid-Tex Gas Division Addition 080.76419 38000 88,403 080 190 - Mid-Tex Gas Division Addition 080.76420 37602 294,441 080 190 - Mid-Tex Gas Division Addition 080.76420 38000 98,147 080 190 - Mid-Tex Gas Division Addition 080.76421 37602 154,374 080 190 - Mid-Tex Gas Division Addition 080.76421 38000 66,160 080 190 - Mid-Tex Gas Division Addition 080.76422 37602 131,080 080 190 - Mid-Tex Gas Division Addition 080.76422 38000 14,564 080 190 - Mid-Tex Gas Division Addition 080.76423 39906 82,925 080 190 - Mid-Tex Gas Division Addition 080.76425 37602 285,423 080 190 - Mid-Tex Gas Division Addition 080.76425 38000 71,356 080 190 - Mid-Tex Gas Division Addition 080.76426 37602 180,283 080 190 - Mid-Tex Gas Division Addition 080.76426 38000 60,094 080 190 - Mid-Tex Gas Division Addition 080.76427 37602 7,653 080 190 - Mid-Tex Gas Division Addition 080.76427 38000 - 080 190 - Mid-Tex Gas Division Addition 080.76428 37602 83,589 080 190 - Mid-Tex Gas Division Addition 080.76428 38000 55,726 080 190 - Mid-Tex Gas Division Addition 080.76429 37602 142,389 080 190 - Mid-Tex Gas Division Addition 080.76429 38000 25,127 080 190 - Mid-Tex Gas Division Addition 080.76430 37602 317,127 080 190 - Mid-Tex Gas Division Addition 080.76430 38000 105,709 080 190 - Mid-Tex Gas Division Addition 080.76431 37602 164,232 080 190 - Mid-Tex Gas Division Addition 080.76431 38000 88,432 080 190 - Mid-Tex Gas Division Addition 080.76433 37602 9,165 080 190 - Mid-Tex Gas Division Addition 080.76434 37601 29,049 080 190 - Mid-Tex Gas Division Addition 080.76434 37602 58,098 080 190 - Mid-Tex Gas Division Addition 080.76434 37800 58,098 080 190 - Mid-Tex Gas Division Addition 080.76435 39903 340,855 080 190 - Mid-Tex Gas Division Addition 080.76440 37602 217 080 190 - Mid-Tex Gas Division Addition 080.76448 39000 3,119 080 190 - Mid-Tex Gas Division Addition 080.76451 37602 428,747 080 190 - Mid-Tex Gas Division Addition 080.76451 38000 107,187 080 190 - Mid-Tex Gas Division Addition 080.76458 37602 712,363 080 190 - Mid-Tex Gas Division Addition 080.76460 37602 22,329 080 190 - Mid-Tex Gas Division Addition 080.76461 37602 401,402 080 190 - Mid-Tex Gas Division Addition 080.76461 38000 267,601 080 190 - Mid-Tex Gas Division Addition 080.76462 37602 29,539 080 190 - Mid-Tex Gas Division Addition 080.76468 37602 55,291 080 190 - Mid-Tex Gas Division Addition 080.76468 38000 2,910 080 190 - Mid-Tex Gas Division Addition 080.76469 37602 513,850 080 190 - Mid-Tex Gas Division Addition 080.76470 37602 23,266 080 190 - Mid-Tex Gas Division Addition 080.76472 37602 273,279 080 190 - Mid-Tex Gas Division Addition 080.76473 37602 117,924 080 190 - Mid-Tex Gas Division Addition 080.76473 37800 117,924 080 190 - Mid-Tex Gas Division Addition 080.76473 38000 26,205 080 190 - Mid-Tex Gas Division Addition 080.76478 37602 6,006 080 190 - Mid-Tex Gas Division Addition 080.76481 37602 47,848 080 190 - Mid-Tex Gas Division Addition 080.76481 38000 5,316 080 190 - Mid-Tex Gas Division Addition 080.76482 37602 283,826 080 190 - Mid-Tex Gas Division Addition 080.76483 37602 117,156 080 190 - Mid-Tex Gas Division Addition 080.76483 38000 13,017 080 190 - Mid-Tex Gas Division Addition 080.76490 37602 243,645 080 190 - Mid-Tex Gas Division Addition 080.76491 37600 70,976 080 190 - Mid-Tex Gas Division Addition 080.76492 37602 102,091 080 190 - Mid-Tex Gas Division Addition 080.76496 37602 274,154 080 190 - Mid-Tex Gas Division Addition 080.76496 38000 30,462 080 190 - Mid-Tex Gas Division Addition 080.76498 37602 501,436 080 190 - Mid-Tex Gas Division Addition 080.76498 38000 55,715 080 190 - Mid-Tex Gas Division Addition 080.76501 39000 12,862 080 190 - Mid-Tex Gas Division Addition 080.76504 37602 (16,386) 080 190 - Mid-Tex Gas Division Addition 080.76504 38000 (684) 080 190 - Mid-Tex Gas Division Addition 080.76508 37602 178,087 080 190 - Mid-Tex Gas Division Addition 080.76509 37602 80,465 080 190 - Mid-Tex Gas Division Addition 080.76509 38000 34,485 080 190 - Mid-Tex Gas Division Addition 080.76510 37602 381,541 080 190 - Mid-Tex Gas Division Addition 080.76510 38000 53,416 080 190 - Mid-Tex Gas Division Addition 080.76511 37602 500,128 080 190 - Mid-Tex Gas Division Addition 080.76513 37602 564,924 080 190 - Mid-Tex Gas Division Addition 080.76513 38000 62,769 080 190 - Mid-Tex Gas Division Addition 080.76514 37602 520,141 080 190 - Mid-Tex Gas Division Addition 080.76515 37602 375,999 080 190 - Mid-Tex Gas Division Addition 080.76515 38000 41,778 080 190 - Mid-Tex Gas Division Addition 080.76516 37601 47,354 080 190 - Mid-Tex Gas Division Addition 080.76516 37602 402,513 080 190 - Mid-Tex Gas Division Addition 080.76516 38000 23,677 080 190 - Mid-Tex Gas Division Addition 080.76519 37602 4,952 080 190 - Mid-Tex Gas Division Addition 080.76521 37602 132,753 080 190 - Mid-Tex Gas Division Addition 080.76522 37602 495,438 080 190 - Mid-Tex Gas Division Addition 080.76522 38000 26,076 MTX Additions by FERC Page 90 of 101 488 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.76523 37601 24,632 080 190 - Mid-Tex Gas Division Addition 080.76524 37602 194,238 080 190 - Mid-Tex Gas Division Addition 080.76525 37602 43,535 080 190 - Mid-Tex Gas Division Addition 080.76526 37602 95,516 080 190 - Mid-Tex Gas Division Addition 080.76527 37602 207,912 080 190 - Mid-Tex Gas Division Addition 080.76532 37602 91,086 080 190 - Mid-Tex Gas Division Addition 080.76535 37602 23,742 080 190 - Mid-Tex Gas Division Addition 080.76538 37602 494,919 080 190 - Mid-Tex Gas Division Addition 080.76538 38000 15,307 080 190 - Mid-Tex Gas Division Addition 080.76544 39400 350,349 080 190 - Mid-Tex Gas Division Addition 080.76550 37602 55,957 080 190 - Mid-Tex Gas Division Addition 080.76554 37602 56,762 080 190 - Mid-Tex Gas Division Addition 080.76555 37602 172,838 080 190 - Mid-Tex Gas Division Addition 080.76556 37602 465,372 080 190 - Mid-Tex Gas Division Addition 080.76556 38000 4,701 080 190 - Mid-Tex Gas Division Addition 080.76557 37602 233,736 080 190 - Mid-Tex Gas Division Addition 080.76557 38000 12,302 080 190 - Mid-Tex Gas Division Addition 080.76560 37602 28,632 080 190 - Mid-Tex Gas Division Addition 080.76562 37602 88,564 080 190 - Mid-Tex Gas Division Addition 080.76571 37601 85,706 080 190 - Mid-Tex Gas Division Addition 080.76571 37800 74,527 080 190 - Mid-Tex Gas Division Addition 080.76574 37602 401,719 080 190 - Mid-Tex Gas Division Addition 080.76575 37602 251,133 080 190 - Mid-Tex Gas Division Addition 080.76575 38000 44,318 080 190 - Mid-Tex Gas Division Addition 080.76577 39906 3,294 080 190 - Mid-Tex Gas Division Addition 080.76580 37602 81,002 080 190 - Mid-Tex Gas Division Addition 080.76580 37800 81,002 080 190 - Mid-Tex Gas Division Addition 080.76581 37602 46,269 080 190 - Mid-Tex Gas Division Addition 080.76582 37602 396,789 080 190 - Mid-Tex Gas Division Addition 080.76587 37602 962,958 080 190 - Mid-Tex Gas Division Addition 080.76588 37602 23,468 080 190 - Mid-Tex Gas Division Addition 080.76589 37602 165,811 080 190 - Mid-Tex Gas Division Addition 080.76590 37602 129,533 080 190 - Mid-Tex Gas Division Addition 080.76590 38000 14,393 080 190 - Mid-Tex Gas Division Addition 080.76591 37602 307,852 080 190 - Mid-Tex Gas Division Addition 080.76591 37800 16,203 080 190 - Mid-Tex Gas Division Addition 080.76592 37602 17,948 080 190 - Mid-Tex Gas Division Addition 080.76612 37602 9,034 080 190 - Mid-Tex Gas Division Addition 080.76615 37602 16,271 080 190 - Mid-Tex Gas Division Addition 080.76615 37800 0 080 190 - Mid-Tex Gas Division Addition 080.76615 38000 714 080 190 - Mid-Tex Gas Division Addition 080.76621 39903 28,822 080 190 - Mid-Tex Gas Division Addition 080.76624 37602 4,887 080 190 - Mid-Tex Gas Division Addition 080.76627 39000 5,205 080 190 - Mid-Tex Gas Division Addition 080.76628 37602 372,463 080 190 - Mid-Tex Gas Division Addition 080.76628 38000 93,116 080 190 - Mid-Tex Gas Division Addition 080.76629 37602 6,866 080 190 - Mid-Tex Gas Division Addition 080.76633 37602 1,503 080 190 - Mid-Tex Gas Division Addition 080.76635 39400 606,708 080 190 - Mid-Tex Gas Division Addition 080.76638 37602 18,433 080 190 - Mid-Tex Gas Division Addition 080.76638 37800 64,514 080 190 - Mid-Tex Gas Division Addition 080.76638 38500 9,216 080 190 - Mid-Tex Gas Division Addition 080.76641 37500 5,053 080 190 - Mid-Tex Gas Division Addition 080.76644 37602 824,154 080 190 - Mid-Tex Gas Division Addition 080.76644 38000 206,039 080 190 - Mid-Tex Gas Division Addition 080.76650 37602 267,966 080 190 - Mid-Tex Gas Division Addition 080.76650 38000 14,103 080 190 - Mid-Tex Gas Division Addition 080.76653 37602 46,262 080 190 - Mid-Tex Gas Division Addition 080.76655 37602 136,092 080 190 - Mid-Tex Gas Division Addition 080.76655 38000 5,229 080 190 - Mid-Tex Gas Division Addition 080.76656 37602 1,735 080 190 - Mid-Tex Gas Division Addition 080.76657 37602 303,727 080 190 - Mid-Tex Gas Division Addition 080.76657 38000 303,727 080 190 - Mid-Tex Gas Division Addition 080.76658 37602 47,091 080 190 - Mid-Tex Gas Division Addition 080.76659 37602 621,350 080 190 - Mid-Tex Gas Division Addition 080.76660 37602 599,734 080 190 - Mid-Tex Gas Division Addition 080.76660 38000 199,911 080 190 - Mid-Tex Gas Division Addition 080.76661 37602 247,654 080 190 - Mid-Tex Gas Division Addition 080.76661 38000 27,517 080 190 - Mid-Tex Gas Division Addition 080.76662 37602 54,998 080 190 - Mid-Tex Gas Division Addition 080.76662 37800 82,498 080 190 - Mid-Tex Gas Division Addition 080.76664 37602 4,895 080 190 - Mid-Tex Gas Division Addition 080.76666 37602 147,405 080 190 - Mid-Tex Gas Division Addition 080.76666 38000 98,270 080 190 - Mid-Tex Gas Division Addition 080.76672 37602 50,757 080 190 - Mid-Tex Gas Division Addition 080.76672 37800 62,036 080 190 - Mid-Tex Gas Division Addition 080.76673 37602 53,578 080 190 - Mid-Tex Gas Division Addition 080.76673 37800 73,670 080 190 - Mid-Tex Gas Division Addition 080.76673 38000 6,697 080 190 - Mid-Tex Gas Division Addition 080.76680 37602 46,048 080 190 - Mid-Tex Gas Division Addition 080.76680 37800 69,072 080 190 - Mid-Tex Gas Division Addition 080.76681 37602 72,046 080 190 - Mid-Tex Gas Division Addition 080.76681 37800 108,069 080 190 - Mid-Tex Gas Division Addition 080.76682 37602 402,011 080 190 - Mid-Tex Gas Division Addition 080.76682 38000 156,338 080 190 - Mid-Tex Gas Division Addition 080.76684 37602 82,765 080 190 - Mid-Tex Gas Division Addition 080.76684 37800 113,802 080 190 - Mid-Tex Gas Division Addition 080.76684 38000 10,346 080 190 - Mid-Tex Gas Division Addition 080.76686 37602 149,555 080 190 - Mid-Tex Gas Division Addition 080.76686 37800 64,095 080 190 - Mid-Tex Gas Division Addition 080.76687 37602 37,697 080 190 - Mid-Tex Gas Division Addition 080.76688 37602 15,421 080 190 - Mid-Tex Gas Division Addition 080.76694 38500 20,994 080 190 - Mid-Tex Gas Division Addition 080.76695 37800 193,657 080 190 - Mid-Tex Gas Division Addition 080.76697 37800 554,977 080 190 - Mid-Tex Gas Division Addition 080.76698 37602 3,189 080 190 - Mid-Tex Gas Division Addition 080.76703 39000 751,207 080 190 - Mid-Tex Gas Division Addition 080.76703 39800 39,537 080 190 - Mid-Tex Gas Division Addition 080.76713 37602 372,216 080 190 - Mid-Tex Gas Division Addition 080.76713 38000 41,357 080 190 - Mid-Tex Gas Division Addition 080.76714 38100 58,525 080 190 - Mid-Tex Gas Division Addition 080.76724 37602 63,558 080 190 - Mid-Tex Gas Division Addition 080.76728 37602 13,684 080 190 - Mid-Tex Gas Division Addition 080.76731 37602 370,233 080 190 - Mid-Tex Gas Division Addition 080.76731 38000 158,671 080 190 - Mid-Tex Gas Division Addition 080.76735 37602 37,803 080 190 - Mid-Tex Gas Division Addition 080.76737 37602 144,273 MTX Additions by FERC Page 91 of 101 489 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.76738 37602 49,148 080 190 - Mid-Tex Gas Division Addition 080.76738 38000 2,587 080 190 - Mid-Tex Gas Division Addition 080.76752 37602 63,303 080 190 - Mid-Tex Gas Division Addition 080.76754 37602 219,098 080 190 - Mid-Tex Gas Division Addition 080.76763 37602 79,161 080 190 - Mid-Tex Gas Division Addition 080.76765 37602 21,612 080 190 - Mid-Tex Gas Division Addition 080.76765 38000 0 080 190 - Mid-Tex Gas Division Addition 080.76771 37602 35,723 080 190 - Mid-Tex Gas Division Addition 080.76771 38000 1,880 080 190 - Mid-Tex Gas Division Addition 080.76773 37601 285,352 080 190 - Mid-Tex Gas Division Addition 080.76773 37602 203,823 080 190 - Mid-Tex Gas Division Addition 080.76773 37800 326,116 080 190 - Mid-Tex Gas Division Addition 080.76776 37602 (5,609) 080 190 - Mid-Tex Gas Division Addition 080.76778 37602 100,630 080 190 - Mid-Tex Gas Division Addition 080.76780 38500 50,505 080 190 - Mid-Tex Gas Division Addition 080.76782 37602 114,824 080 190 - Mid-Tex Gas Division Addition 080.76782 38000 6,043 080 190 - Mid-Tex Gas Division Addition 080.76783 37602 9,119 080 190 - Mid-Tex Gas Division Addition 080.76783 38000 480 080 190 - Mid-Tex Gas Division Addition 080.76788 37602 24,697 080 190 - Mid-Tex Gas Division Addition 080.76793 37602 42,366 080 190 - Mid-Tex Gas Division Addition 080.76793 38000 2,230 080 190 - Mid-Tex Gas Division Addition 080.76794 37602 42,881 080 190 - Mid-Tex Gas Division Addition 080.76794 38000 - 080 190 - Mid-Tex Gas Division Addition 080.76799 37602 447,840 080 190 - Mid-Tex Gas Division Addition 080.76799 38000 241,145 080 190 - Mid-Tex Gas Division Addition 080.76806 37602 23,493 080 190 - Mid-Tex Gas Division Addition 080.76806 38000 3,535 080 190 - Mid-Tex Gas Division Addition 080.76808 37602 (41,948) 080 190 - Mid-Tex Gas Division Addition 080.76808 38000 (1,274) 080 190 - Mid-Tex Gas Division Addition 080.76809 37602 98,655 080 190 - Mid-Tex Gas Division Addition 080.76813 37602 197,994 080 190 - Mid-Tex Gas Division Addition 080.76814 37602 451,845 080 190 - Mid-Tex Gas Division Addition 080.76814 38000 112,961 080 190 - Mid-Tex Gas Division Addition 080.76815 37602 21,984 080 190 - Mid-Tex Gas Division Addition 080.76819 37602 94,386 080 190 - Mid-Tex Gas Division Addition 080.76819 38000 40,451 080 190 - Mid-Tex Gas Division Addition 080.76823 37602 62,959 080 190 - Mid-Tex Gas Division Addition 080.76823 38000 3,314 080 190 - Mid-Tex Gas Division Addition 080.76825 37602 11,165 080 190 - Mid-Tex Gas Division Addition 080.76826 37800 49,841 080 190 - Mid-Tex Gas Division Addition 080.76827 37602 21,317 080 190 - Mid-Tex Gas Division Addition 080.76830 37602 11,580 080 190 - Mid-Tex Gas Division Addition 080.76831 37602 456,746 080 190 - Mid-Tex Gas Division Addition 080.76832 37601 1,185,083 080 190 - Mid-Tex Gas Division Addition 080.76833 37601 (137) 080 190 - Mid-Tex Gas Division Addition 080.76835 37602 435,280 080 190 - Mid-Tex Gas Division Addition 080.76835 38000 145,093 080 190 - Mid-Tex Gas Division Addition 080.76841 37602 211,429 080 190 - Mid-Tex Gas Division Addition 080.76841 38000 23,492 080 190 - Mid-Tex Gas Division Addition 080.76842 37602 194,282 080 190 - Mid-Tex Gas Division Addition 080.76842 38000 64,761 080 190 - Mid-Tex Gas Division Addition 080.76845 37602 8,790 080 190 - Mid-Tex Gas Division Addition 080.76846 37602 (43,526) 080 190 - Mid-Tex Gas Division Addition 080.76847 37602 82,883 080 190 - Mid-Tex Gas Division Addition 080.76848 37602 49,299 080 190 - Mid-Tex Gas Division Addition 080.76857 37602 78,401 080 190 - Mid-Tex Gas Division Addition 080.76858 37602 140,194 080 190 - Mid-Tex Gas Division Addition 080.76861 37602 26,988 080 190 - Mid-Tex Gas Division Addition 080.76862 37601 138,847 080 190 - Mid-Tex Gas Division Addition 080.76864 37602 10,426 080 190 - Mid-Tex Gas Division Addition 080.76864 38000 1,158 080 190 - Mid-Tex Gas Division Addition 080.76864 38100 761,824 080 190 - Mid-Tex Gas Division Addition 080.76864 38300 19,463 080 190 - Mid-Tex Gas Division Addition 080.76867 37600 128,736 080 190 - Mid-Tex Gas Division Addition 080.76873 37602 111,034 080 190 - Mid-Tex Gas Division Addition 080.76873 38000 21,149 080 190 - Mid-Tex Gas Division Addition 080.76888 37602 185,784 080 190 - Mid-Tex Gas Division Addition 080.76888 38000 7,741 080 190 - Mid-Tex Gas Division Addition 080.76889 37602 204,051 080 190 - Mid-Tex Gas Division Addition 080.76889 38000 109,874 080 190 - Mid-Tex Gas Division Addition 080.76890 37602 184,935 080 190 - Mid-Tex Gas Division Addition 080.76890 38000 99,580 080 190 - Mid-Tex Gas Division Addition 080.76891 37602 222,265 080 190 - Mid-Tex Gas Division Addition 080.76891 38000 74,088 080 190 - Mid-Tex Gas Division Addition 080.76892 37602 207,258 080 190 - Mid-Tex Gas Division Addition 080.76892 38000 69,086 080 190 - Mid-Tex Gas Division Addition 080.76893 37602 211,776 080 190 - Mid-Tex Gas Division Addition 080.76893 38000 52,944 080 190 - Mid-Tex Gas Division Addition 080.76894 37602 217,285 080 190 - Mid-Tex Gas Division Addition 080.76894 38000 93,122 080 190 - Mid-Tex Gas Division Addition 080.76895 37602 119,862 080 190 - Mid-Tex Gas Division Addition 080.76895 38000 51,369 080 190 - Mid-Tex Gas Division Addition 080.76897 37602 175,386 080 190 - Mid-Tex Gas Division Addition 080.76897 38000 94,439 080 190 - Mid-Tex Gas Division Addition 080.76898 37602 202,163 080 190 - Mid-Tex Gas Division Addition 080.76898 38000 108,857 080 190 - Mid-Tex Gas Division Addition 080.76899 37602 135,001 080 190 - Mid-Tex Gas Division Addition 080.76899 38000 15,000 080 190 - Mid-Tex Gas Division Addition 080.76908 38000 922,238 080 190 - Mid-Tex Gas Division Addition 080.76912 37602 451,269 080 190 - Mid-Tex Gas Division Addition 080.76912 38000 61,537 080 190 - Mid-Tex Gas Division Addition 080.76913 37602 639,692 080 190 - Mid-Tex Gas Division Addition 080.76913 38000 159,923 080 190 - Mid-Tex Gas Division Addition 080.76915 37602 626,372 080 190 - Mid-Tex Gas Division Addition 080.76915 38000 110,536 080 190 - Mid-Tex Gas Division Addition 080.76921 37602 16,011 080 190 - Mid-Tex Gas Division Addition 080.76922 37602 36,827 080 190 - Mid-Tex Gas Division Addition 080.76924 37602 39,009 080 190 - Mid-Tex Gas Division Addition 080.76925 37602 143,342 080 190 - Mid-Tex Gas Division Addition 080.76925 38000 7,544 080 190 - Mid-Tex Gas Division Addition 080.76929 37602 133,148 080 190 - Mid-Tex Gas Division Addition 080.76929 38000 23,497 080 190 - Mid-Tex Gas Division Addition 080.76930 37602 11,562 080 190 - Mid-Tex Gas Division Addition 080.76931 37602 7,604 080 190 - Mid-Tex Gas Division Addition 080.76932 37602 73,231 080 190 - Mid-Tex Gas Division Addition 080.76936 39400 67,495 MTX Additions by FERC Page 92 of 101 490 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.76937 37602 82,376 080 190 - Mid-Tex Gas Division Addition 080.76937 38000 20,594 080 190 - Mid-Tex Gas Division Addition 080.76946 37602 6,326 080 190 - Mid-Tex Gas Division Addition 080.76950 39400 1,746 080 190 - Mid-Tex Gas Division Addition 080.76951 37602 414,341 080 190 - Mid-Tex Gas Division Addition 080.76951 38000 138,114 080 190 - Mid-Tex Gas Division Addition 080.76957 37602 265,958 080 190 - Mid-Tex Gas Division Addition 080.76964 37602 108,376 080 190 - Mid-Tex Gas Division Addition 080.76965 37602 211,740 080 190 - Mid-Tex Gas Division Addition 080.76965 38000 11,144 080 190 - Mid-Tex Gas Division Addition 080.76967 37602 227,217 080 190 - Mid-Tex Gas Division Addition 080.76968 37602 16,556 080 190 - Mid-Tex Gas Division Addition 080.76971 37602 366,462 080 190 - Mid-Tex Gas Division Addition 080.76974 37602 7,792 080 190 - Mid-Tex Gas Division Addition 080.76975 37602 327,327 080 190 - Mid-Tex Gas Division Addition 080.76975 38000 24,637 080 190 - Mid-Tex Gas Division Addition 080.76978 37602 178 080 190 - Mid-Tex Gas Division Addition 080.76983 37602 498,041 080 190 - Mid-Tex Gas Division Addition 080.76983 38000 26,213 080 190 - Mid-Tex Gas Division Addition 080.76988 37602 37,966 080 190 - Mid-Tex Gas Division Addition 080.76988 38000 380 080 190 - Mid-Tex Gas Division Addition 080.76989 37602 72,710 080 190 - Mid-Tex Gas Division Addition 080.76989 38000 72,710 080 190 - Mid-Tex Gas Division Addition 080.76990 37602 31,073 080 190 - Mid-Tex Gas Division Addition 080.76992 37602 66,737 080 190 - Mid-Tex Gas Division Addition 080.76993 37602 154,998 080 190 - Mid-Tex Gas Division Addition 080.76993 38000 27,353 080 190 - Mid-Tex Gas Division Addition 080.76998 37602 1,234,139 080 190 - Mid-Tex Gas Division Addition 080.76998 38000 217,789 080 190 - Mid-Tex Gas Division Addition 080.77000 37602 82,642 080 190 - Mid-Tex Gas Division Addition 080.77000 38000 9,182 080 190 - Mid-Tex Gas Division Addition 080.77006 39400 315,183 080 190 - Mid-Tex Gas Division Addition 080.77007 37602 127,201 080 190 - Mid-Tex Gas Division Addition 080.77009 37602 60,234 080 190 - Mid-Tex Gas Division Addition 080.77011 37602 26,147 080 190 - Mid-Tex Gas Division Addition 080.77012 37602 294,517 080 190 - Mid-Tex Gas Division Addition 080.77012 37800 26,179 080 190 - Mid-Tex Gas Division Addition 080.77012 38000 6,545 080 190 - Mid-Tex Gas Division Addition 080.77016 37602 224,396 080 190 - Mid-Tex Gas Division Addition 080.77019 37602 31,936 080 190 - Mid-Tex Gas Division Addition 080.77025 37602 10,926 080 190 - Mid-Tex Gas Division Addition 080.77026 37602 1,397 080 190 - Mid-Tex Gas Division Addition 080.77031 37602 119,026 080 190 - Mid-Tex Gas Division Addition 080.77031 38000 29,757 080 190 - Mid-Tex Gas Division Addition 080.77036 37602 229,674 080 190 - Mid-Tex Gas Division Addition 080.77039 37602 560,942 080 190 - Mid-Tex Gas Division Addition 080.77039 38000 29,523 080 190 - Mid-Tex Gas Division Addition 080.77041 37602 3,626 080 190 - Mid-Tex Gas Division Addition 080.77042 37602 248,101 080 190 - Mid-Tex Gas Division Addition 080.77043 37602 87,450 080 190 - Mid-Tex Gas Division Addition 080.77043 37800 58,300 080 190 - Mid-Tex Gas Division Addition 080.77045 37602 10,162 080 190 - Mid-Tex Gas Division Addition 080.77046 37602 175,099 080 190 - Mid-Tex Gas Division Addition 080.77046 38000 19,455 080 190 - Mid-Tex Gas Division Addition 080.77048 37602 134,390 080 190 - Mid-Tex Gas Division Addition 080.77048 38000 72,364 080 190 - Mid-Tex Gas Division Addition 080.77049 37602 260,832 080 190 - Mid-Tex Gas Division Addition 080.77049 38000 65,208 080 190 - Mid-Tex Gas Division Addition 080.77051 37601 231,240 080 190 - Mid-Tex Gas Division Addition 080.77051 37800 12,847 080 190 - Mid-Tex Gas Division Addition 080.77051 38000 6,423 080 190 - Mid-Tex Gas Division Addition 080.77051 38500 6,423 080 190 - Mid-Tex Gas Division Addition 080.77054 37602 49,286 080 190 - Mid-Tex Gas Division Addition 080.77054 37800 115,001 080 190 - Mid-Tex Gas Division Addition 080.77055 37602 14,917 080 190 - Mid-Tex Gas Division Addition 080.77055 38000 2,808 080 190 - Mid-Tex Gas Division Addition 080.77057 37800 25,203 080 190 - Mid-Tex Gas Division Addition 080.77058 37602 52,376 080 190 - Mid-Tex Gas Division Addition 080.77058 37800 122,210 080 190 - Mid-Tex Gas Division Addition 080.77062 37602 95,872 080 190 - Mid-Tex Gas Division Addition 080.77062 37800 41,088 080 190 - Mid-Tex Gas Division Addition 080.77064 37602 42,436 080 190 - Mid-Tex Gas Division Addition 080.77064 37800 99,017 080 190 - Mid-Tex Gas Division Addition 080.77068 37602 8,295 080 190 - Mid-Tex Gas Division Addition 080.77069 37602 106,872 080 190 - Mid-Tex Gas Division Addition 080.77070 37602 86,240 080 190 - Mid-Tex Gas Division Addition 080.77073 37602 81,636 080 190 - Mid-Tex Gas Division Addition 080.77073 37800 66,793 080 190 - Mid-Tex Gas Division Addition 080.77074 37602 278,590 080 190 - Mid-Tex Gas Division Addition 080.77078 37602 265,741 080 190 - Mid-Tex Gas Division Addition 080.77078 38000 46,896 080 190 - Mid-Tex Gas Division Addition 080.77080 37602 65,640 080 190 - Mid-Tex Gas Division Addition 080.77080 38000 7,293 080 190 - Mid-Tex Gas Division Addition 080.77081 37602 7,998 080 190 - Mid-Tex Gas Division Addition 080.77086 37602 57,410 080 190 - Mid-Tex Gas Division Addition 080.77086 38000 3,022 080 190 - Mid-Tex Gas Division Addition 080.77087 37602 27,308 080 190 - Mid-Tex Gas Division Addition 080.77087 38000 1,437 080 190 - Mid-Tex Gas Division Addition 080.77091 37602 169,073 080 190 - Mid-Tex Gas Division Addition 080.77091 38000 50,502 080 190 - Mid-Tex Gas Division Addition 080.77092 37602 107,046 080 190 - Mid-Tex Gas Division Addition 080.77093 37602 22,222 080 190 - Mid-Tex Gas Division Addition 080.77093 38000 - 080 190 - Mid-Tex Gas Division Addition 080.77094 37602 35,929 080 190 - Mid-Tex Gas Division Addition 080.77103 37602 44,697 080 190 - Mid-Tex Gas Division Addition 080.77109 37602 602,239 080 190 - Mid-Tex Gas Division Addition 080.77109 38000 31,697 080 190 - Mid-Tex Gas Division Addition 080.77110 37602 50,260 080 190 - Mid-Tex Gas Division Addition 080.77110 37800 61,429 080 190 - Mid-Tex Gas Division Addition 080.77111 37602 652,076 080 190 - Mid-Tex Gas Division Addition 080.77113 37602 170,503 080 190 - Mid-Tex Gas Division Addition 080.77113 38000 56,834 080 190 - Mid-Tex Gas Division Addition 080.77114 37602 191,670 080 190 - Mid-Tex Gas Division Addition 080.77114 38000 38,334 080 190 - Mid-Tex Gas Division Addition 080.77119 37600 54,605 080 190 - Mid-Tex Gas Division Addition 080.77120 37600 64,033 080 190 - Mid-Tex Gas Division Addition 080.77132 37602 17,861 MTX Additions by FERC Page 93 of 101 491 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.77140 37602 67,761 080 190 - Mid-Tex Gas Division Addition 080.77153 37602 365,351 080 190 - Mid-Tex Gas Division Addition 080.77156 37602 25,572 080 190 - Mid-Tex Gas Division Addition 080.77160 37601 110,824 080 190 - Mid-Tex Gas Division Addition 080.77160 37602 997,418 080 190 - Mid-Tex Gas Division Addition 080.77166 37602 10,038 080 190 - Mid-Tex Gas Division Addition 080.77167 37602 886,113 080 190 - Mid-Tex Gas Division Addition 080.77167 38000 98,457 080 190 - Mid-Tex Gas Division Addition 080.77197 37602 0 080 190 - Mid-Tex Gas Division Addition 080.77197 38000 35,872 080 190 - Mid-Tex Gas Division Addition 080.77198 37602 113,597 080 190 - Mid-Tex Gas Division Addition 080.77198 37800 113,597 080 190 - Mid-Tex Gas Division Addition 080.77203 37602 47,391 080 190 - Mid-Tex Gas Division Addition 080.77208 37602 121,861 080 190 - Mid-Tex Gas Division Addition 080.77208 38000 30,465 080 190 - Mid-Tex Gas Division Addition 080.77215 37602 11,199 080 190 - Mid-Tex Gas Division Addition 080.77217 37602 255,723 080 190 - Mid-Tex Gas Division Addition 080.77217 38000 63,931 080 190 - Mid-Tex Gas Division Addition 080.77218 37602 247,895 080 190 - Mid-Tex Gas Division Addition 080.77218 38000 106,241 080 190 - Mid-Tex Gas Division Addition 080.77219 37602 159,764 080 190 - Mid-Tex Gas Division Addition 080.77219 38000 75,183 080 190 - Mid-Tex Gas Division Addition 080.77220 37602 122,278 080 190 - Mid-Tex Gas Division Addition 080.77220 38000 49,944 080 190 - Mid-Tex Gas Division Addition 080.77224 37602 168,314 080 190 - Mid-Tex Gas Division Addition 080.77224 38000 65,455 080 190 - Mid-Tex Gas Division Addition 080.77227 37602 206,228 080 190 - Mid-Tex Gas Division Addition 080.77240 37602 76,021 080 190 - Mid-Tex Gas Division Addition 080.77250 37602 33,376 080 190 - Mid-Tex Gas Division Addition 080.77256 37602 21,870 080 190 - Mid-Tex Gas Division Addition 080.77258 39400 1,592 080 190 - Mid-Tex Gas Division Addition 080.77259 37602 8,039 080 190 - Mid-Tex Gas Division Addition 080.77263 37602 177,259 080 190 - Mid-Tex Gas Division Addition 080.77263 38000 116,405 080 190 - Mid-Tex Gas Division Addition 080.77264 37602 358,931 080 190 - Mid-Tex Gas Division Addition 080.77265 37602 106,592 080 190 - Mid-Tex Gas Division Addition 080.77265 38000 35,531 080 190 - Mid-Tex Gas Division Addition 080.77267 37602 372,833 080 190 - Mid-Tex Gas Division Addition 080.77267 38000 19,623 080 190 - Mid-Tex Gas Division Addition 080.77268 37602 51,546 080 190 - Mid-Tex Gas Division Addition 080.77276 37602 32,930 080 190 - Mid-Tex Gas Division Addition 080.77282 37602 88,427 080 190 - Mid-Tex Gas Division Addition 080.77286 39400 9,578 080 190 - Mid-Tex Gas Division Addition 080.77288 37602 5,978 080 190 - Mid-Tex Gas Division Addition 080.77291 37602 227,353 080 190 - Mid-Tex Gas Division Addition 080.77291 38000 75,784 080 190 - Mid-Tex Gas Division Addition 080.77294 37602 255,179 080 190 - Mid-Tex Gas Division Addition 080.77296 37602 184,424 080 190 - Mid-Tex Gas Division Addition 080.77296 38000 79,039 080 190 - Mid-Tex Gas Division Addition 080.77297 37602 431,913 080 190 - Mid-Tex Gas Division Addition 080.77297 38000 431,913 080 190 - Mid-Tex Gas Division Addition 080.77302 37602 6,605 080 190 - Mid-Tex Gas Division Addition 080.77303 37602 5,014 080 190 - Mid-Tex Gas Division Addition 080.77305 37602 316,099 080 190 - Mid-Tex Gas Division Addition 080.77305 38000 170,207 080 190 - Mid-Tex Gas Division Addition 080.77309 37602 16,110 080 190 - Mid-Tex Gas Division Addition 080.77311 37602 146,989 080 190 - Mid-Tex Gas Division Addition 080.77311 38000 16,332 080 190 - Mid-Tex Gas Division Addition 080.77315 39400 4,096 080 190 - Mid-Tex Gas Division Addition 080.77316 37602 41,500 080 190 - Mid-Tex Gas Division Addition 080.77319 37602 193,855 080 190 - Mid-Tex Gas Division Addition 080.77319 38000 14,591 080 190 - Mid-Tex Gas Division Addition 080.77320 37602 28,223 080 190 - Mid-Tex Gas Division Addition 080.77321 37602 5,699 080 190 - Mid-Tex Gas Division Addition 080.77322 37602 134,163 080 190 - Mid-Tex Gas Division Addition 080.77328 37602 348,926 080 190 - Mid-Tex Gas Division Addition 080.77328 38000 149,540 080 190 - Mid-Tex Gas Division Addition 080.77331 37602 22,981 080 190 - Mid-Tex Gas Division Addition 080.77333 39100 10,111 080 190 - Mid-Tex Gas Division Addition 080.77337 37602 1,545 080 190 - Mid-Tex Gas Division Addition 080.77340 37602 77,697 080 190 - Mid-Tex Gas Division Addition 080.77341 37602 177,025 080 190 - Mid-Tex Gas Division Addition 080.77341 38000 44,256 080 190 - Mid-Tex Gas Division Addition 080.77343 37602 46,719 080 190 - Mid-Tex Gas Division Addition 080.77348 37602 108,393 080 190 - Mid-Tex Gas Division Addition 080.77348 38000 30,572 080 190 - Mid-Tex Gas Division Addition 080.77351 37602 71,500 080 190 - Mid-Tex Gas Division Addition 080.77352 37900 11,532 080 190 - Mid-Tex Gas Division Addition 080.77354 37602 23,179 080 190 - Mid-Tex Gas Division Addition 080.77357 37602 193,675 080 190 - Mid-Tex Gas Division Addition 080.77357 38000 42,514 080 190 - Mid-Tex Gas Division Addition 080.77360 37602 34,793 080 190 - Mid-Tex Gas Division Addition 080.77363 37602 19,635 080 190 - Mid-Tex Gas Division Addition 080.77367 37602 30,239 080 190 - Mid-Tex Gas Division Addition 080.77369 37602 181,549 080 190 - Mid-Tex Gas Division Addition 080.77374 37602 - 080 190 - Mid-Tex Gas Division Addition 080.77381 37602 11,118 080 190 - Mid-Tex Gas Division Addition 080.77383 37601 963,540 080 190 - Mid-Tex Gas Division Addition 080.77384 37602 285,651 080 190 - Mid-Tex Gas Division Addition 080.77384 38000 31,739 080 190 - Mid-Tex Gas Division Addition 080.77387 37602 (18,057) 080 190 - Mid-Tex Gas Division Addition 080.77389 37602 35,699 080 190 - Mid-Tex Gas Division Addition 080.77392 37602 21,739 080 190 - Mid-Tex Gas Division Addition 080.77393 37602 8,219 080 190 - Mid-Tex Gas Division Addition 080.77394 37602 446,799 080 190 - Mid-Tex Gas Division Addition 080.77394 38000 118,770 080 190 - Mid-Tex Gas Division Addition 080.77395 37602 672,725 080 190 - Mid-Tex Gas Division Addition 080.77396 37601 316,572 080 190 - Mid-Tex Gas Division Addition 080.77396 37800 16,662 080 190 - Mid-Tex Gas Division Addition 080.77398 37602 7,119 080 190 - Mid-Tex Gas Division Addition 080.77399 37602 27,526 080 190 - Mid-Tex Gas Division Addition 080.77400 37602 4,519 080 190 - Mid-Tex Gas Division Addition 080.77401 37602 727,408 080 190 - Mid-Tex Gas Division Addition 080.77401 38000 484,938 080 190 - Mid-Tex Gas Division Addition 080.77404 37602 3,618 080 190 - Mid-Tex Gas Division Addition 080.77407 37602 20,518 080 190 - Mid-Tex Gas Division Addition 080.77414 37602 401,058 MTX Additions by FERC Page 94 of 101 492 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.77414 38000 126,650 080 190 - Mid-Tex Gas Division Addition 080.77415 39400 1,628 080 190 - Mid-Tex Gas Division Addition 080.77422 37602 166,680 080 190 - Mid-Tex Gas Division Addition 080.77422 38000 29,414 080 190 - Mid-Tex Gas Division Addition 080.77424 37602 21,805 080 190 - Mid-Tex Gas Division Addition 080.77424 38000 1,148 080 190 - Mid-Tex Gas Division Addition 080.77426 39906 251,397 080 190 - Mid-Tex Gas Division Addition 080.77427 37602 60,548 080 190 - Mid-Tex Gas Division Addition 080.77428 37602 388,037 080 190 - Mid-Tex Gas Division Addition 080.77428 38000 33,742 080 190 - Mid-Tex Gas Division Addition 080.77429 37602 761,590 080 190 - Mid-Tex Gas Division Addition 080.77429 38000 253,863 080 190 - Mid-Tex Gas Division Addition 080.77430 37602 298,345 080 190 - Mid-Tex Gas Division Addition 080.77430 38000 15,702 080 190 - Mid-Tex Gas Division Addition 080.77431 37602 31,139 080 190 - Mid-Tex Gas Division Addition 080.77432 37602 303,541 080 190 - Mid-Tex Gas Division Addition 080.77432 38000 95,855 080 190 - Mid-Tex Gas Division Addition 080.77434 37602 216,873 080 190 - Mid-Tex Gas Division Addition 080.77434 38000 9,036 080 190 - Mid-Tex Gas Division Addition 080.77435 37602 497,984 080 190 - Mid-Tex Gas Division Addition 080.77435 38000 55,332 080 190 - Mid-Tex Gas Division Addition 080.77441 37602 38,258 080 190 - Mid-Tex Gas Division Addition 080.77445 37602 266,009 080 190 - Mid-Tex Gas Division Addition 080.77445 38000 11,084 080 190 - Mid-Tex Gas Division Addition 080.77448 37602 335,220 080 190 - Mid-Tex Gas Division Addition 080.77448 38000 37,247 080 190 - Mid-Tex Gas Division Addition 080.77451 39400 7,239 080 190 - Mid-Tex Gas Division Addition 080.77452 37602 3,697 080 190 - Mid-Tex Gas Division Addition 080.77452 38000 411 080 190 - Mid-Tex Gas Division Addition 080.77456 37602 45,273 080 190 - Mid-Tex Gas Division Addition 080.77456 38000 2,383 080 190 - Mid-Tex Gas Division Addition 080.77459 37602 143,518 080 190 - Mid-Tex Gas Division Addition 080.77459 38000 35,880 080 190 - Mid-Tex Gas Division Addition 080.77461 37602 92,858 080 190 - Mid-Tex Gas Division Addition 080.77461 37800 83,572 080 190 - Mid-Tex Gas Division Addition 080.77461 38000 9,286 080 190 - Mid-Tex Gas Division Addition 080.77463 37602 48,408 080 190 - Mid-Tex Gas Division Addition 080.77463 38000 2,548 080 190 - Mid-Tex Gas Division Addition 080.77467 37602 76,204 080 190 - Mid-Tex Gas Division Addition 080.77470 37602 178,951 080 190 - Mid-Tex Gas Division Addition 080.77474 37602 47,753 080 190 - Mid-Tex Gas Division Addition 080.77478 37602 108,884 080 190 - Mid-Tex Gas Division Addition 080.77487 39004 15,100 080 190 - Mid-Tex Gas Division Addition 080.77490 37602 36,648 080 190 - Mid-Tex Gas Division Addition 080.77497 37602 792,720 080 190 - Mid-Tex Gas Division Addition 080.77498 37602 5,017 080 190 - Mid-Tex Gas Division Addition 080.77501 39000 1,336,856 080 190 - Mid-Tex Gas Division Addition 080.77505 38000 96,345 080 190 - Mid-Tex Gas Division Addition 080.77506 37602 433,108 080 190 - Mid-Tex Gas Division Addition 080.77506 38000 185,618 080 190 - Mid-Tex Gas Division Addition 080.77517 37602 85,567 080 190 - Mid-Tex Gas Division Addition 080.77517 38000 21,392 080 190 - Mid-Tex Gas Division Addition 080.77519 37602 204,042 080 190 - Mid-Tex Gas Division Addition 080.77519 38000 87,446 080 190 - Mid-Tex Gas Division Addition 080.77520 37602 429,554 080 190 - Mid-Tex Gas Division Addition 080.77520 38000 75,804 080 190 - Mid-Tex Gas Division Addition 080.77521 37601 15,736 080 190 - Mid-Tex Gas Division Addition 080.77521 37602 246,535 080 190 - Mid-Tex Gas Division Addition 080.77521 37800 246,535 080 190 - Mid-Tex Gas Division Addition 080.77521 38000 15,736 080 190 - Mid-Tex Gas Division Addition 080.77523 37602 60,053 080 190 - Mid-Tex Gas Division Addition 080.77523 38000 6,673 080 190 - Mid-Tex Gas Division Addition 080.77526 37602 7,263 080 190 - Mid-Tex Gas Division Addition 080.77532 37602 329,502 080 190 - Mid-Tex Gas Division Addition 080.77532 38000 58,147 080 190 - Mid-Tex Gas Division Addition 080.77533 37602 226,003 080 190 - Mid-Tex Gas Division Addition 080.77533 38000 96,858 080 190 - Mid-Tex Gas Division Addition 080.77534 37600 51,768 080 190 - Mid-Tex Gas Division Addition 080.77540 37601 266,735 080 190 - Mid-Tex Gas Division Addition 080.77544 37602 27,223 080 190 - Mid-Tex Gas Division Addition 080.77545 37602 179,325 080 190 - Mid-Tex Gas Division Addition 080.77545 38000 24,453 080 190 - Mid-Tex Gas Division Addition 080.77546 37602 40,175 080 190 - Mid-Tex Gas Division Addition 080.77547 38000 - 080 190 - Mid-Tex Gas Division Addition 080.77548 37602 151,443 080 190 - Mid-Tex Gas Division Addition 080.77548 37800 123,908 080 190 - Mid-Tex Gas Division Addition 080.77551 37602 25,709 080 190 - Mid-Tex Gas Division Addition 080.77552 37602 247,464 080 190 - Mid-Tex Gas Division Addition 080.77552 38000 13,299 080 190 - Mid-Tex Gas Division Addition 080.77556 37602 159,189 080 190 - Mid-Tex Gas Division Addition 080.77565 37602 3,693 080 190 - Mid-Tex Gas Division Addition 080.77566 37602 325,654 080 190 - Mid-Tex Gas Division Addition 080.77570 38000 763,331 080 190 - Mid-Tex Gas Division Addition 080.77577 37602 41,520 080 190 - Mid-Tex Gas Division Addition 080.77589 37602 5,360 080 190 - Mid-Tex Gas Division Addition 080.77594 37800 82,503 080 190 - Mid-Tex Gas Division Addition 080.77595 37602 325,524 080 190 - Mid-Tex Gas Division Addition 080.77595 38000 3,288 080 190 - Mid-Tex Gas Division Addition 080.77596 37602 372,690 080 190 - Mid-Tex Gas Division Addition 080.77596 38000 111,323 080 190 - Mid-Tex Gas Division Addition 080.77598 37601 27,385 080 190 - Mid-Tex Gas Division Addition 080.77598 37602 63,898 080 190 - Mid-Tex Gas Division Addition 080.77598 37800 82,155 080 190 - Mid-Tex Gas Division Addition 080.77598 38000 9,128 080 190 - Mid-Tex Gas Division Addition 080.77605 37602 11,027 080 190 - Mid-Tex Gas Division Addition 080.77608 39400 12,443 080 190 - Mid-Tex Gas Division Addition 080.77610 37602 543,491 080 190 - Mid-Tex Gas Division Addition 080.77615 37602 177,307 080 190 - Mid-Tex Gas Division Addition 080.77616 37601 26,838 080 190 - Mid-Tex Gas Division Addition 080.77616 37602 456,243 080 190 - Mid-Tex Gas Division Addition 080.77616 38000 53,676 080 190 - Mid-Tex Gas Division Addition 080.77619 37602 12,638 080 190 - Mid-Tex Gas Division Addition 080.77621 37602 23,828 080 190 - Mid-Tex Gas Division Addition 080.77633 39400 10,838 080 190 - Mid-Tex Gas Division Addition 080.77634 37800 11,434 080 190 - Mid-Tex Gas Division Addition 080.77637 37602 8,913 080 190 - Mid-Tex Gas Division Addition 080.77643 39004 15,514 MTX Additions by FERC Page 95 of 101 493 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.77647 39400 3,612 080 190 - Mid-Tex Gas Division Addition 080.77648 37602 48,423 080 190 - Mid-Tex Gas Division Addition 080.77648 37800 59,183 080 190 - Mid-Tex Gas Division Addition 080.77650 37602 52,958 080 190 - Mid-Tex Gas Division Addition 080.77664 37602 245,864 080 190 - Mid-Tex Gas Division Addition 080.77665 37602 23,229 080 190 - Mid-Tex Gas Division Addition 080.77669 37601 309,297 080 190 - Mid-Tex Gas Division Addition 080.77670 37601 56,511 080 190 - Mid-Tex Gas Division Addition 080.77670 37602 131,859 080 190 - Mid-Tex Gas Division Addition 080.77670 37800 169,533 080 190 - Mid-Tex Gas Division Addition 080.77670 38000 18,837 080 190 - Mid-Tex Gas Division Addition 080.77673 37602 175,661 080 190 - Mid-Tex Gas Division Addition 080.77673 38000 43,915 080 190 - Mid-Tex Gas Division Addition 080.77674 37602 200,022 080 190 - Mid-Tex Gas Division Addition 080.77674 38000 22,225 080 190 - Mid-Tex Gas Division Addition 080.77675 37602 155,372 080 190 - Mid-Tex Gas Division Addition 080.77675 38000 38,843 080 190 - Mid-Tex Gas Division Addition 080.77686 38000 9,322 080 190 - Mid-Tex Gas Division Addition 080.77687 37602 26,501 080 190 - Mid-Tex Gas Division Addition 080.77688 37602 46,010 080 190 - Mid-Tex Gas Division Addition 080.77689 37602 249,265 080 190 - Mid-Tex Gas Division Addition 080.77689 38000 43,988 080 190 - Mid-Tex Gas Division Addition 080.77690 37602 13,268 080 190 - Mid-Tex Gas Division Addition 080.77692 37602 154,724 080 190 - Mid-Tex Gas Division Addition 080.77692 38000 27,304 080 190 - Mid-Tex Gas Division Addition 080.77693 37601 2,015,444 080 190 - Mid-Tex Gas Division Addition 080.77693 37800 221,477 080 190 - Mid-Tex Gas Division Addition 080.77694 37602 239,240 080 190 - Mid-Tex Gas Division Addition 080.77694 38000 59,810 080 190 - Mid-Tex Gas Division Addition 080.77695 37602 175,642 080 190 - Mid-Tex Gas Division Addition 080.77695 38000 43,911 080 190 - Mid-Tex Gas Division Addition 080.77700 37601 219,691 080 190 - Mid-Tex Gas Division Addition 080.77706 39000 22,361 080 190 - Mid-Tex Gas Division Addition 080.77708 37602 475,704 080 190 - Mid-Tex Gas Division Addition 080.77710 37602 268,729 080 190 - Mid-Tex Gas Division Addition 080.77710 38000 63,035 080 190 - Mid-Tex Gas Division Addition 080.77714 37602 353,233 080 190 - Mid-Tex Gas Division Addition 080.77714 38000 117,744 080 190 - Mid-Tex Gas Division Addition 080.77715 37602 600,461 080 190 - Mid-Tex Gas Division Addition 080.77715 38000 233,513 080 190 - Mid-Tex Gas Division Addition 080.77716 37602 304,677 080 190 - Mid-Tex Gas Division Addition 080.77716 38000 49,599 080 190 - Mid-Tex Gas Division Addition 080.77717 37602 281,224 080 190 - Mid-Tex Gas Division Addition 080.77717 38000 109,365 080 190 - Mid-Tex Gas Division Addition 080.77721 37602 203,729 080 190 - Mid-Tex Gas Division Addition 080.77721 38000 50,932 080 190 - Mid-Tex Gas Division Addition 080.77724 37602 38,752 080 190 - Mid-Tex Gas Division Addition 080.77724 38000 1,615 080 190 - Mid-Tex Gas Division Addition 080.77730 37602 259,703 080 190 - Mid-Tex Gas Division Addition 080.77730 38000 28,856 080 190 - Mid-Tex Gas Division Addition 080.77736 37602 49,395 080 190 - Mid-Tex Gas Division Addition 080.77743 37602 52,380 080 190 - Mid-Tex Gas Division Addition 080.77743 38000 5,820 080 190 - Mid-Tex Gas Division Addition 080.77744 37602 777,901 080 190 - Mid-Tex Gas Division Addition 080.77744 38000 86,433 080 190 - Mid-Tex Gas Division Addition 080.77746 37602 62,805 080 190 - Mid-Tex Gas Division Addition 080.77746 38000 11,083 080 190 - Mid-Tex Gas Division Addition 080.77747 39000 25,307 080 190 - Mid-Tex Gas Division Addition 080.77749 37602 108,392 080 190 - Mid-Tex Gas Division Addition 080.77750 37602 222,446 080 190 - Mid-Tex Gas Division Addition 080.77750 38000 98,656 080 190 - Mid-Tex Gas Division Addition 080.77751 37602 405,128 080 190 - Mid-Tex Gas Division Addition 080.77751 38000 35,229 080 190 - Mid-Tex Gas Division Addition 080.77755 37602 1,353,588 080 190 - Mid-Tex Gas Division Addition 080.77755 38000 220,351 080 190 - Mid-Tex Gas Division Addition 080.77756 37601 2,246 080 190 - Mid-Tex Gas Division Addition 080.77756 37602 24,706 080 190 - Mid-Tex Gas Division Addition 080.77756 37800 17,968 080 190 - Mid-Tex Gas Division Addition 080.77760 37602 22,606 080 190 - Mid-Tex Gas Division Addition 080.77760 38000 3,989 080 190 - Mid-Tex Gas Division Addition 080.77763 37602 7,282 080 190 - Mid-Tex Gas Division Addition 080.77764 37602 113,428 080 190 - Mid-Tex Gas Division Addition 080.77764 38000 113,428 080 190 - Mid-Tex Gas Division Addition 080.77768 39000 22,353 080 190 - Mid-Tex Gas Division Addition 080.77771 37602 189,209 080 190 - Mid-Tex Gas Division Addition 080.77771 38000 81,089 080 190 - Mid-Tex Gas Division Addition 080.77772 37800 7,989 080 190 - Mid-Tex Gas Division Addition 080.77786 37602 (21,055) 080 190 - Mid-Tex Gas Division Addition 080.77787 37602 10,689 080 190 - Mid-Tex Gas Division Addition 080.77790 37602 149,378 080 190 - Mid-Tex Gas Division Addition 080.77791 37602 221,806 080 190 - Mid-Tex Gas Division Addition 080.77791 38000 147,870 080 190 - Mid-Tex Gas Division Addition 080.77793 37602 1,009 080 190 - Mid-Tex Gas Division Addition 080.77794 37602 35,799 080 190 - Mid-Tex Gas Division Addition 080.77802 37602 34,042 080 190 - Mid-Tex Gas Division Addition 080.77808 37602 602,124 080 190 - Mid-Tex Gas Division Addition 080.77808 38000 150,531 080 190 - Mid-Tex Gas Division Addition 080.77810 37602 418,006 080 190 - Mid-Tex Gas Division Addition 080.77810 38000 167,202 080 190 - Mid-Tex Gas Division Addition 080.77812 37602 380,974 080 190 - Mid-Tex Gas Division Addition 080.77812 38000 95,244 080 190 - Mid-Tex Gas Division Addition 080.77813 37602 1,219 080 190 - Mid-Tex Gas Division Addition 080.77814 37602 286,860 080 190 - Mid-Tex Gas Division Addition 080.77814 38000 71,715 080 190 - Mid-Tex Gas Division Addition 080.77815 37602 299,106 080 190 - Mid-Tex Gas Division Addition 080.77815 38000 74,777 080 190 - Mid-Tex Gas Division Addition 080.77819 37602 132,293 080 190 - Mid-Tex Gas Division Addition 080.77819 38000 14,699 080 190 - Mid-Tex Gas Division Addition 080.77821 37602 2,871 080 190 - Mid-Tex Gas Division Addition 080.77823 37602 136,308 080 190 - Mid-Tex Gas Division Addition 080.77823 38000 7,174 080 190 - Mid-Tex Gas Division Addition 080.77825 37602 168,246 080 190 - Mid-Tex Gas Division Addition 080.77825 38000 18,694 080 190 - Mid-Tex Gas Division Addition 080.77826 37602 134,241 080 190 - Mid-Tex Gas Division Addition 080.77826 38000 75,510 080 190 - Mid-Tex Gas Division Addition 080.77832 37602 32,597 080 190 - Mid-Tex Gas Division Addition 080.77840 37602 768,127 MTX Additions by FERC Page 96 of 101 494 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.77840 38000 23,757 080 190 - Mid-Tex Gas Division Addition 080.77842 37601 32,158 080 190 - Mid-Tex Gas Division Addition 080.77842 37602 289,420 080 190 - Mid-Tex Gas Division Addition 080.77842 38000 32,158 080 190 - Mid-Tex Gas Division Addition 080.77854 37602 71,116 080 190 - Mid-Tex Gas Division Addition 080.77854 38000 7,902 080 190 - Mid-Tex Gas Division Addition 080.77860 37602 384,759 080 190 - Mid-Tex Gas Division Addition 080.77860 38000 33,457 080 190 - Mid-Tex Gas Division Addition 080.77865 37602 112,045 080 190 - Mid-Tex Gas Division Addition 080.77865 38000 5,897 080 190 - Mid-Tex Gas Division Addition 080.77867 37602 46,100 080 190 - Mid-Tex Gas Division Addition 080.77867 37800 173,424 080 190 - Mid-Tex Gas Division Addition 080.77878 37602 32,749 080 190 - Mid-Tex Gas Division Addition 080.77893 37800 144,948 080 190 - Mid-Tex Gas Division Addition 080.77894 37602 27,096 080 190 - Mid-Tex Gas Division Addition 080.77894 37800 108,386 080 190 - Mid-Tex Gas Division Addition 080.77895 37800 121,255 080 190 - Mid-Tex Gas Division Addition 080.77897 37602 17,515 080 190 - Mid-Tex Gas Division Addition 080.77898 37602 54,536 080 190 - Mid-Tex Gas Division Addition 080.77899 37602 101,288 080 190 - Mid-Tex Gas Division Addition 080.77899 38000 19,293 080 190 - Mid-Tex Gas Division Addition 080.77905 38000 188,877 080 190 - Mid-Tex Gas Division Addition 080.77907 37602 4,561 080 190 - Mid-Tex Gas Division Addition 080.77909 37601 945,669 080 190 - Mid-Tex Gas Division Addition 080.77912 37602 160,319 080 190 - Mid-Tex Gas Division Addition 080.77912 38000 28,292 080 190 - Mid-Tex Gas Division Addition 080.77914 37602 62,442 080 190 - Mid-Tex Gas Division Addition 080.77914 38000 15,611 080 190 - Mid-Tex Gas Division Addition 080.77916 37602 86,587 080 190 - Mid-Tex Gas Division Addition 080.77916 38000 2,678 080 190 - Mid-Tex Gas Division Addition 080.77920 37602 172,448 080 190 - Mid-Tex Gas Division Addition 080.77920 38000 21,314 080 190 - Mid-Tex Gas Division Addition 080.77921 37602 51,212 080 190 - Mid-Tex Gas Division Addition 080.77921 37800 34,141 080 190 - Mid-Tex Gas Division Addition 080.77922 37800 50,784 080 190 - Mid-Tex Gas Division Addition 080.77923 37601 11,482 080 190 - Mid-Tex Gas Division Addition 080.77923 37602 45,928 080 190 - Mid-Tex Gas Division Addition 080.77923 37800 57,410 080 190 - Mid-Tex Gas Division Addition 080.77924 37601 12,002 080 190 - Mid-Tex Gas Division Addition 080.77924 37602 60,012 080 190 - Mid-Tex Gas Division Addition 080.77924 37800 48,010 080 190 - Mid-Tex Gas Division Addition 080.77925 37601 12,757 080 190 - Mid-Tex Gas Division Addition 080.77925 37602 63,785 080 190 - Mid-Tex Gas Division Addition 080.77925 37800 51,028 080 190 - Mid-Tex Gas Division Addition 080.77926 37601 9,179 080 190 - Mid-Tex Gas Division Addition 080.77926 37602 91,785 080 190 - Mid-Tex Gas Division Addition 080.77926 38500 82,607 080 190 - Mid-Tex Gas Division Addition 080.77927 37601 12,874 080 190 - Mid-Tex Gas Division Addition 080.77927 37602 64,368 080 190 - Mid-Tex Gas Division Addition 080.77927 37800 51,495 080 190 - Mid-Tex Gas Division Addition 080.77928 37800 46,729 080 190 - Mid-Tex Gas Division Addition 080.77929 38500 50,534 080 190 - Mid-Tex Gas Division Addition 080.77930 37601 11,037 080 190 - Mid-Tex Gas Division Addition 080.77930 37602 66,223 080 190 - Mid-Tex Gas Division Addition 080.77930 37800 33,112 080 190 - Mid-Tex Gas Division Addition 080.77932 37800 40,356 080 190 - Mid-Tex Gas Division Addition 080.77933 37602 60,667 080 190 - Mid-Tex Gas Division Addition 080.77933 37800 40,445 080 190 - Mid-Tex Gas Division Addition 080.77934 37601 9,155 080 190 - Mid-Tex Gas Division Addition 080.77934 37602 41,199 080 190 - Mid-Tex Gas Division Addition 080.77934 37800 41,199 080 190 - Mid-Tex Gas Division Addition 080.77941 37602 23,572 080 190 - Mid-Tex Gas Division Addition 080.77950 39400 12,861 080 190 - Mid-Tex Gas Division Addition 080.77953 37602 18,104 080 190 - Mid-Tex Gas Division Addition 080.77960 37601 2,750 080 190 - Mid-Tex Gas Division Addition 080.77960 37602 195,269 080 190 - Mid-Tex Gas Division Addition 080.77960 38000 77,007 080 190 - Mid-Tex Gas Division Addition 080.77961 37602 3,057 080 190 - Mid-Tex Gas Division Addition 080.77967 37602 (128,444) 080 190 - Mid-Tex Gas Division Addition 080.77967 38000 (973) 080 190 - Mid-Tex Gas Division Addition 080.77969 39004 16,396 080 190 - Mid-Tex Gas Division Addition 080.77970 37602 336,850 080 190 - Mid-Tex Gas Division Addition 080.77970 38000 17,729 080 190 - Mid-Tex Gas Division Addition 080.77971 37602 140,637 080 190 - Mid-Tex Gas Division Addition 080.77971 38000 17,382 080 190 - Mid-Tex Gas Division Addition 080.77972 37602 (8,476) 080 190 - Mid-Tex Gas Division Addition 080.77972 38000 2,660 080 190 - Mid-Tex Gas Division Addition 080.77985 37602 142,759 080 190 - Mid-Tex Gas Division Addition 080.77985 38000 119,970 080 190 - Mid-Tex Gas Division Addition 080.77991 37800 47,532 080 190 - Mid-Tex Gas Division Addition 080.77991 38700 0 080 190 - Mid-Tex Gas Division Addition 080.78001 37602 244,501 080 190 - Mid-Tex Gas Division Addition 080.78012 37602 2,869 080 190 - Mid-Tex Gas Division Addition 080.78014 37602 231,962 080 190 - Mid-Tex Gas Division Addition 080.78014 38000 31,631 080 190 - Mid-Tex Gas Division Addition 080.78025 37602 13,770 080 190 - Mid-Tex Gas Division Addition 080.78026 37602 39,645 080 190 - Mid-Tex Gas Division Addition 080.78027 37602 5,524 080 190 - Mid-Tex Gas Division Addition 080.78028 37602 27,832 080 190 - Mid-Tex Gas Division Addition 080.78030 37602 147,802 080 190 - Mid-Tex Gas Division Addition 080.78042 37602 91,057 080 190 - Mid-Tex Gas Division Addition 080.78047 37602 26,353 080 190 - Mid-Tex Gas Division Addition 080.78049 37602 185,589 080 190 - Mid-Tex Gas Division Addition 080.78049 38000 52,346 080 190 - Mid-Tex Gas Division Addition 080.78062 37602 12,838 080 190 - Mid-Tex Gas Division Addition 080.78064 37602 18,503 080 190 - Mid-Tex Gas Division Addition 080.78064 38000 4,857 080 190 - Mid-Tex Gas Division Addition 080.78075 37602 373,749 080 190 - Mid-Tex Gas Division Addition 080.78075 38000 50,966 080 190 - Mid-Tex Gas Division Addition 080.78076 37602 18,695 080 190 - Mid-Tex Gas Division Addition 080.78081 37602 39,034 080 190 - Mid-Tex Gas Division Addition 080.78081 38000 9,759 080 190 - Mid-Tex Gas Division Addition 080.78092 37800 73,735 080 190 - Mid-Tex Gas Division Addition 080.78093 37601 819,592 080 190 - Mid-Tex Gas Division Addition 080.78098 37602 33,776 080 190 - Mid-Tex Gas Division Addition 080.78102 37602 27,797 080 190 - Mid-Tex Gas Division Addition 080.78104 37602 22,876 MTX Additions by FERC Page 97 of 101 495 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.78104 38000 1,204 080 190 - Mid-Tex Gas Division Addition 080.78105 37602 7,857 080 190 - Mid-Tex Gas Division Addition 080.78105 37800 44,525 080 190 - Mid-Tex Gas Division Addition 080.78109 37602 157,509 080 190 - Mid-Tex Gas Division Addition 080.78109 38000 67,504 080 190 - Mid-Tex Gas Division Addition 080.78120 37602 11,248 080 190 - Mid-Tex Gas Division Addition 080.78125 37602 233,750 080 190 - Mid-Tex Gas Division Addition 080.78127 37602 91,920 080 190 - Mid-Tex Gas Division Addition 080.78128 39000 9,008 080 190 - Mid-Tex Gas Division Addition 080.78129 37602 49,086 080 190 - Mid-Tex Gas Division Addition 080.78130 39400 1,682 080 190 - Mid-Tex Gas Division Addition 080.78131 37602 (12,782) 080 190 - Mid-Tex Gas Division Addition 080.78133 37602 405,597 080 190 - Mid-Tex Gas Division Addition 080.78133 38000 228,148 080 190 - Mid-Tex Gas Division Addition 080.78137 37602 (47,439) 080 190 - Mid-Tex Gas Division Addition 080.78143 37602 363,152 080 190 - Mid-Tex Gas Division Addition 080.78143 38000 50,438 080 190 - Mid-Tex Gas Division Addition 080.78145 37602 26,254 080 190 - Mid-Tex Gas Division Addition 080.78145 38000 924 080 190 - Mid-Tex Gas Division Addition 080.78146 37602 140,024 080 190 - Mid-Tex Gas Division Addition 080.78146 38000 35,006 080 190 - Mid-Tex Gas Division Addition 080.78147 37602 201,665 080 190 - Mid-Tex Gas Division Addition 080.78147 38000 50,416 080 190 - Mid-Tex Gas Division Addition 080.78149 37602 101,027 080 190 - Mid-Tex Gas Division Addition 080.78149 38000 17,828 080 190 - Mid-Tex Gas Division Addition 080.78150 37602 32,149 080 190 - Mid-Tex Gas Division Addition 080.78153 37602 (113,136) 080 190 - Mid-Tex Gas Division Addition 080.78155 37602 9,167 080 190 - Mid-Tex Gas Division Addition 080.78155 38000 1,019 080 190 - Mid-Tex Gas Division Addition 080.78161 39400 442,641 080 190 - Mid-Tex Gas Division Addition 080.78163 39400 217,891 080 190 - Mid-Tex Gas Division Addition 080.78167 37602 41,746 080 190 - Mid-Tex Gas Division Addition 080.78168 39906 7,729 080 190 - Mid-Tex Gas Division Addition 080.78169 37602 41,891 080 190 - Mid-Tex Gas Division Addition 080.78169 38000 4,655 080 190 - Mid-Tex Gas Division Addition 080.78172 37602 369,251 080 190 - Mid-Tex Gas Division Addition 080.78172 38000 290,126 080 190 - Mid-Tex Gas Division Addition 080.78173 37602 50,111 080 190 - Mid-Tex Gas Division Addition 080.78173 38000 5,568 080 190 - Mid-Tex Gas Division Addition 080.78176 37602 211,753 080 190 - Mid-Tex Gas Division Addition 080.78176 38000 28,875 080 190 - Mid-Tex Gas Division Addition 080.78181 37602 26,463 080 190 - Mid-Tex Gas Division Addition 080.78183 38000 166,078 080 190 - Mid-Tex Gas Division Addition 080.78184 37602 158,489 080 190 - Mid-Tex Gas Division Addition 080.78184 38000 52,830 080 190 - Mid-Tex Gas Division Addition 080.78187 37602 6,478 080 190 - Mid-Tex Gas Division Addition 080.78189 37602 346,596 080 190 - Mid-Tex Gas Division Addition 080.78189 38000 115,532 080 190 - Mid-Tex Gas Division Addition 080.78192 37602 169,105 080 190 - Mid-Tex Gas Division Addition 080.78193 37602 283,066 080 190 - Mid-Tex Gas Division Addition 080.78193 38000 231,600 080 190 - Mid-Tex Gas Division Addition 080.78194 37602 517,776 080 190 - Mid-Tex Gas Division Addition 080.78194 38000 304,090 080 190 - Mid-Tex Gas Division Addition 080.78195 37602 18,776 080 190 - Mid-Tex Gas Division Addition 080.78201 37602 33,901 080 190 - Mid-Tex Gas Division Addition 080.78204 37602 14,524 080 190 - Mid-Tex Gas Division Addition 080.78205 37602 (11,403) 080 190 - Mid-Tex Gas Division Addition 080.78205 38000 (1,267) 080 190 - Mid-Tex Gas Division Addition 080.78216 37800 32,030 080 190 - Mid-Tex Gas Division Addition 080.78218 37602 330,623 080 190 - Mid-Tex Gas Division Addition 080.78220 37602 10,986 080 190 - Mid-Tex Gas Division Addition 080.78226 38000 5,278 080 190 - Mid-Tex Gas Division Addition 080.78229 37602 55,925 080 190 - Mid-Tex Gas Division Addition 080.78229 38000 2,943 080 190 - Mid-Tex Gas Division Addition 080.78230 37602 390,389 080 190 - Mid-Tex Gas Division Addition 080.78230 38000 43,377 080 190 - Mid-Tex Gas Division Addition 080.78232 39400 5,430 080 190 - Mid-Tex Gas Division Addition 080.78233 37602 7,446 080 190 - Mid-Tex Gas Division Addition 080.78233 38000 141,473 080 190 - Mid-Tex Gas Division Addition 080.78234 37602 0 080 190 - Mid-Tex Gas Division Addition 080.78247 37602 (1,715) 080 190 - Mid-Tex Gas Division Addition 080.78252 37602 35,394 080 190 - Mid-Tex Gas Division Addition 080.78254 37602 7,838 080 190 - Mid-Tex Gas Division Addition 080.78256 37602 23,382 080 190 - Mid-Tex Gas Division Addition 080.78257 37602 8,165 080 190 - Mid-Tex Gas Division Addition 080.78262 37602 19,749 080 190 - Mid-Tex Gas Division Addition 080.78263 37602 12,098 080 190 - Mid-Tex Gas Division Addition 080.78264 37602 443,571 080 190 - Mid-Tex Gas Division Addition 080.78270 37602 33,011 080 190 - Mid-Tex Gas Division Addition 080.78283 37602 36,531 080 190 - Mid-Tex Gas Division Addition 080.78283 38000 572 080 190 - Mid-Tex Gas Division Addition 080.78300 37602 350,273 080 190 - Mid-Tex Gas Division Addition 080.78300 38000 7 080 190 - Mid-Tex Gas Division Addition 080.78301 37602 323,844 080 190 - Mid-Tex Gas Division Addition 080.78301 38000 35,983 080 190 - Mid-Tex Gas Division Addition 080.78314 37602 24,534 080 190 - Mid-Tex Gas Division Addition 080.78319 37602 (57,174) 080 190 - Mid-Tex Gas Division Addition 080.78337 37602 102,384 080 190 - Mid-Tex Gas Division Addition 080.78338 37602 30,958 080 190 - Mid-Tex Gas Division Addition 080.78344 37602 15,949 080 190 - Mid-Tex Gas Division Addition 080.78345 37602 17,444 080 190 - Mid-Tex Gas Division Addition 080.78349 37602 394,484 080 190 - Mid-Tex Gas Division Addition 080.78349 38000 98,621 080 190 - Mid-Tex Gas Division Addition 080.78350 37602 259,524 080 190 - Mid-Tex Gas Division Addition 080.78350 38000 5,296 080 190 - Mid-Tex Gas Division Addition 080.78351 39906 24,582 080 190 - Mid-Tex Gas Division Addition 080.78358 37602 10,904 080 190 - Mid-Tex Gas Division Addition 080.78364 37602 73,089 080 190 - Mid-Tex Gas Division Addition 080.78366 37602 73,330 080 190 - Mid-Tex Gas Division Addition 080.78367 37602 107,600 080 190 - Mid-Tex Gas Division Addition 080.78374 37602 70,041 080 190 - Mid-Tex Gas Division Addition 080.78374 38000 3,686 080 190 - Mid-Tex Gas Division Addition 080.78376 39400 4,835 080 190 - Mid-Tex Gas Division Addition 080.78378 38000 4,303 080 190 - Mid-Tex Gas Division Addition 080.78379 37602 71,929 080 190 - Mid-Tex Gas Division Addition 080.78384 37602 (232,257) 080 190 - Mid-Tex Gas Division Addition 080.78384 37800 (82,949) MTX Additions by FERC Page 98 of 101 496 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.78384 38000 (16,590) 080 190 - Mid-Tex Gas Division Addition 080.78386 37602 3,112 080 190 - Mid-Tex Gas Division Addition 080.78389 37602 241,354 080 190 - Mid-Tex Gas Division Addition 080.78389 38000 80,451 080 190 - Mid-Tex Gas Division Addition 080.78396 37602 24,344 080 190 - Mid-Tex Gas Division Addition 080.78398 37602 440,300 080 190 - Mid-Tex Gas Division Addition 080.78398 38000 18,346 080 190 - Mid-Tex Gas Division Addition 080.78399 37602 7,008 080 190 - Mid-Tex Gas Division Addition 080.78399 38000 369 080 190 - Mid-Tex Gas Division Addition 080.78400 37602 489,688 080 190 - Mid-Tex Gas Division Addition 080.78400 38000 25,773 080 190 - Mid-Tex Gas Division Addition 080.78401 37602 218,645 080 190 - Mid-Tex Gas Division Addition 080.78401 38000 38,584 080 190 - Mid-Tex Gas Division Addition 080.78402 37602 347,658 080 190 - Mid-Tex Gas Division Addition 080.78402 38000 18,298 080 190 - Mid-Tex Gas Division Addition 080.78404 37602 253,855 080 190 - Mid-Tex Gas Division Addition 080.78404 38000 63,464 080 190 - Mid-Tex Gas Division Addition 080.78415 37602 (7,158) 080 190 - Mid-Tex Gas Division Addition 080.78416 37602 (37,131) 080 190 - Mid-Tex Gas Division Addition 080.78416 38000 (1,954) 080 190 - Mid-Tex Gas Division Addition 080.78424 37602 939 080 190 - Mid-Tex Gas Division Addition 080.78429 37602 205,944 080 190 - Mid-Tex Gas Division Addition 080.78431 39400 2,816 080 190 - Mid-Tex Gas Division Addition 080.78432 39400 2,736 080 190 - Mid-Tex Gas Division Addition 080.78434 39400 5,737 080 190 - Mid-Tex Gas Division Addition 080.78444 37602 318,847 080 190 - Mid-Tex Gas Division Addition 080.78444 38000 79,712 080 190 - Mid-Tex Gas Division Addition 080.78445 37602 143,509 080 190 - Mid-Tex Gas Division Addition 080.78445 38000 35,877 080 190 - Mid-Tex Gas Division Addition 080.78448 37602 207,976 080 190 - Mid-Tex Gas Division Addition 080.78448 38000 51,994 080 190 - Mid-Tex Gas Division Addition 080.78450 37602 138,012 080 190 - Mid-Tex Gas Division Addition 080.78456 37602 531,930 080 190 - Mid-Tex Gas Division Addition 080.78464 37602 148,367 080 190 - Mid-Tex Gas Division Addition 080.78464 38000 37,092 080 190 - Mid-Tex Gas Division Addition 080.78466 37602 24,955 080 190 - Mid-Tex Gas Division Addition 080.78466 38000 1 080 190 - Mid-Tex Gas Division Addition 080.78472 37601 3,422,012 080 190 - Mid-Tex Gas Division Addition 080.78475 39000 12,053 080 190 - Mid-Tex Gas Division Addition 080.78490 37602 3,487 080 190 - Mid-Tex Gas Division Addition 080.78506 37602 375,404 080 190 - Mid-Tex Gas Division Addition 080.78506 38000 41,712 080 190 - Mid-Tex Gas Division Addition 080.78508 37602 171,150 080 190 - Mid-Tex Gas Division Addition 080.78508 38000 19,017 080 190 - Mid-Tex Gas Division Addition 080.78509 37602 408,282 080 190 - Mid-Tex Gas Division Addition 080.78509 38000 102,070 080 190 - Mid-Tex Gas Division Addition 080.78513 37602 22,770 080 190 - Mid-Tex Gas Division Addition 080.78519 37602 3,354 080 190 - Mid-Tex Gas Division Addition 080.78522 39400 8,371 080 190 - Mid-Tex Gas Division Addition 080.78524 37602 7,863 080 190 - Mid-Tex Gas Division Addition 080.78526 37602 (67,846) 080 190 - Mid-Tex Gas Division Addition 080.78526 38000 (3,571) 080 190 - Mid-Tex Gas Division Addition 080.78528 37602 60,472 080 190 - Mid-Tex Gas Division Addition 080.78528 37800 90,709 080 190 - Mid-Tex Gas Division Addition 080.78530 37601 277,342 080 190 - Mid-Tex Gas Division Addition 080.78536 39400 16,280 080 190 - Mid-Tex Gas Division Addition 080.78545 37602 7,841 080 190 - Mid-Tex Gas Division Addition 080.78545 38000 6,723 080 190 - Mid-Tex Gas Division Addition 080.78550 39400 4,175 080 190 - Mid-Tex Gas Division Addition 080.78556 39400 4,462 080 190 - Mid-Tex Gas Division Addition 080.78558 37602 6,855 080 190 - Mid-Tex Gas Division Addition 080.78559 37602 22,477 080 190 - Mid-Tex Gas Division Addition 080.78560 37602 4,841 080 190 - Mid-Tex Gas Division Addition 080.78570 37602 162,225 080 190 - Mid-Tex Gas Division Addition 080.78570 38000 28,628 080 190 - Mid-Tex Gas Division Addition 080.78581 37602 94,445 080 190 - Mid-Tex Gas Division Addition 080.78581 38000 8,213 080 190 - Mid-Tex Gas Division Addition 080.78586 37602 22,625 080 190 - Mid-Tex Gas Division Addition 080.78586 38000 462 080 190 - Mid-Tex Gas Division Addition 080.78588 39400 3,229 080 190 - Mid-Tex Gas Division Addition 080.78589 37602 465,063 080 190 - Mid-Tex Gas Division Addition 080.78589 38000 116,266 080 190 - Mid-Tex Gas Division Addition 080.78595 37602 6,825 080 190 - Mid-Tex Gas Division Addition 080.78595 38000 758 080 190 - Mid-Tex Gas Division Addition 080.78607 37602 407 080 190 - Mid-Tex Gas Division Addition 080.78608 37602 222,560 080 190 - Mid-Tex Gas Division Addition 080.78608 38000 24,729 080 190 - Mid-Tex Gas Division Addition 080.78609 37602 26,452 080 190 - Mid-Tex Gas Division Addition 080.78613 37602 279,535 080 190 - Mid-Tex Gas Division Addition 080.78613 38000 186,357 080 190 - Mid-Tex Gas Division Addition 080.78615 37602 13,125 080 190 - Mid-Tex Gas Division Addition 080.78618 37602 61,137 080 190 - Mid-Tex Gas Division Addition 080.78621 37602 67,561 080 190 - Mid-Tex Gas Division Addition 080.78621 38000 7,507 080 190 - Mid-Tex Gas Division Addition 080.78622 37602 272,046 080 190 - Mid-Tex Gas Division Addition 080.78622 38000 213,102 080 190 - Mid-Tex Gas Division Addition 080.78629 37602 175,529 080 190 - Mid-Tex Gas Division Addition 080.78630 37601 12,787 080 190 - Mid-Tex Gas Division Addition 080.78630 37800 9,836 080 190 - Mid-Tex Gas Division Addition 080.78630 37900 1,967 080 190 - Mid-Tex Gas Division Addition 080.78634 37602 190,478 080 190 - Mid-Tex Gas Division Addition 080.78647 37602 34,618 080 190 - Mid-Tex Gas Division Addition 080.78648 37602 38,108 080 190 - Mid-Tex Gas Division Addition 080.78649 37602 466,349 080 190 - Mid-Tex Gas Division Addition 080.78649 38000 24,545 080 190 - Mid-Tex Gas Division Addition 080.78658 37602 (16,904) 080 190 - Mid-Tex Gas Division Addition 080.78659 37602 162,234 080 190 - Mid-Tex Gas Division Addition 080.78665 37602 369,360 080 190 - Mid-Tex Gas Division Addition 080.78668 37602 192,647 080 190 - Mid-Tex Gas Division Addition 080.78668 38000 10,139 080 190 - Mid-Tex Gas Division Addition 080.78676 37602 5,045 080 190 - Mid-Tex Gas Division Addition 080.78677 37602 48,475 080 190 - Mid-Tex Gas Division Addition 080.78677 38000 16,158 080 190 - Mid-Tex Gas Division Addition 080.78678 37602 84,104 080 190 - Mid-Tex Gas Division Addition 080.78691 37602 33,303 080 190 - Mid-Tex Gas Division Addition 080.78697 37602 654,132 080 190 - Mid-Tex Gas Division Addition 080.78705 37602 1,207,358 MTX Additions by FERC Page 99 of 101 497 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.78708 37602 2,648 080 190 - Mid-Tex Gas Division Addition 080.78709 37602 3,322 080 190 - Mid-Tex Gas Division Addition 080.78713 37602 284,591 080 190 - Mid-Tex Gas Division Addition 080.78713 38000 121,968 080 190 - Mid-Tex Gas Division Addition 080.78720 37602 521,040 080 190 - Mid-Tex Gas Division Addition 080.78727 39400 19,193 080 190 - Mid-Tex Gas Division Addition 080.78728 37602 8,797 080 190 - Mid-Tex Gas Division Addition 080.78732 37602 18,057 080 190 - Mid-Tex Gas Division Addition 080.78739 37602 38,820 080 190 - Mid-Tex Gas Division Addition 080.78741 37800 94,917 080 190 - Mid-Tex Gas Division Addition 080.78744 37602 15,050 080 190 - Mid-Tex Gas Division Addition 080.78757 37601 532,139 080 190 - Mid-Tex Gas Division Addition 080.78769 39400 1,543 080 190 - Mid-Tex Gas Division Addition 080.78781 37800 7,006 080 190 - Mid-Tex Gas Division Addition 080.78797 37602 306,546 080 190 - Mid-Tex Gas Division Addition 080.78806 37602 20,879 080 190 - Mid-Tex Gas Division Addition 080.78810 37602 14,981 080 190 - Mid-Tex Gas Division Addition 080.78823 37602 84,534 080 190 - Mid-Tex Gas Division Addition 080.78825 37602 121,554 080 190 - Mid-Tex Gas Division Addition 080.78831 37602 117,627 080 190 - Mid-Tex Gas Division Addition 080.78831 38000 13,069 080 190 - Mid-Tex Gas Division Addition 080.78832 37602 82,160 080 190 - Mid-Tex Gas Division Addition 080.78847 39400 17,190 080 190 - Mid-Tex Gas Division Addition 080.78849 37601 229,744 080 190 - Mid-Tex Gas Division Addition 080.78865 37602 121,778 080 190 - Mid-Tex Gas Division Addition 080.78867 37602 110,189 080 190 - Mid-Tex Gas Division Addition 080.78868 39000 28,153 080 190 - Mid-Tex Gas Division Addition 080.78872 37602 41,455 080 190 - Mid-Tex Gas Division Addition 080.78877 37602 203,255 080 190 - Mid-Tex Gas Division Addition 080.78877 38000 22,584 080 190 - Mid-Tex Gas Division Addition 080.78890 39000 286,349 080 190 - Mid-Tex Gas Division Addition 080.78892 37602 266,563 080 190 - Mid-Tex Gas Division Addition 080.78892 38000 14,030 080 190 - Mid-Tex Gas Division Addition 080.78895 37800 10,236 080 190 - Mid-Tex Gas Division Addition 080.78896 37800 7,082 080 190 - Mid-Tex Gas Division Addition 080.78898 37602 135,454 080 190 - Mid-Tex Gas Division Addition 080.78898 37800 67,727 080 190 - Mid-Tex Gas Division Addition 080.78898 38000 22,576 080 190 - Mid-Tex Gas Division Addition 080.78906 37602 160,216 080 190 - Mid-Tex Gas Division Addition 080.78916 39000 6,798 080 190 - Mid-Tex Gas Division Addition 080.78926 39000 8,345 080 190 - Mid-Tex Gas Division Addition 080.78937 37601 32,354 080 190 - Mid-Tex Gas Division Addition 080.78957 37602 197,833 080 190 - Mid-Tex Gas Division Addition 080.78957 38000 21,981 080 190 - Mid-Tex Gas Division Addition 080.78966 39000 4,278 080 190 - Mid-Tex Gas Division Addition 080.78971 37602 144,675 080 190 - Mid-Tex Gas Division Addition 080.78971 38000 16,075 080 190 - Mid-Tex Gas Division Addition 080.78977 37602 165,281 080 190 - Mid-Tex Gas Division Addition 080.78977 38000 110,187 080 190 - Mid-Tex Gas Division Addition 080.78978 37602 310,466 080 190 - Mid-Tex Gas Division Addition 080.78978 38000 6,336 080 190 - Mid-Tex Gas Division Addition 080.78979 37602 213,358 080 190 - Mid-Tex Gas Division Addition 080.78979 38000 16,059 080 190 - Mid-Tex Gas Division Addition 080.78981 37602 264,149 080 190 - Mid-Tex Gas Division Addition 080.78983 37602 78,139 080 190 - Mid-Tex Gas Division Addition 080.78983 38000 4,113 080 190 - Mid-Tex Gas Division Addition 080.78992 37602 146,354 080 190 - Mid-Tex Gas Division Addition 080.78992 38000 16,262 080 190 - Mid-Tex Gas Division Addition 080.79000 37602 252,247 080 190 - Mid-Tex Gas Division Addition 080.79001 37602 48,022 080 190 - Mid-Tex Gas Division Addition 080.79001 38000 2,527 080 190 - Mid-Tex Gas Division Addition 080.79002 37602 33,947 080 190 - Mid-Tex Gas Division Addition 080.79004 37602 64,537 080 190 - Mid-Tex Gas Division Addition 080.79004 38000 7,171 080 190 - Mid-Tex Gas Division Addition 080.79005 37602 2,711 080 190 - Mid-Tex Gas Division Addition 080.79011 37602 29,740 080 190 - Mid-Tex Gas Division Addition 080.79012 37602 - 080 190 - Mid-Tex Gas Division Addition 080.79022 39100 4,919 080 190 - Mid-Tex Gas Division Addition 080.79023 37602 191,085 080 190 - Mid-Tex Gas Division Addition 080.79034 39400 28,419 080 190 - Mid-Tex Gas Division Addition 080.79037 37800 13,351 080 190 - Mid-Tex Gas Division Addition 080.79039 37602 101,783 080 190 - Mid-Tex Gas Division Addition 080.79064 38000 122,872 080 190 - Mid-Tex Gas Division Addition 080.79065 37602 26,187 080 190 - Mid-Tex Gas Division Addition 080.79068 38000 (72,712) 080 190 - Mid-Tex Gas Division Addition 080.79072 37602 80,064 080 190 - Mid-Tex Gas Division Addition 080.79073 37602 21,711 080 190 - Mid-Tex Gas Division Addition 080.79077 37602 4,949 080 190 - Mid-Tex Gas Division Addition 080.79081 38000 7,302 080 190 - Mid-Tex Gas Division Addition 080.79083 37601 39,572 080 190 - Mid-Tex Gas Division Addition 080.79117 37602 28,734 080 190 - Mid-Tex Gas Division Addition 080.79126 37602 821,542 080 190 - Mid-Tex Gas Division Addition 080.79126 38000 43,239 080 190 - Mid-Tex Gas Division Addition 080.79130 37602 70,022 080 190 - Mid-Tex Gas Division Addition 080.79137 37602 81,928 080 190 - Mid-Tex Gas Division Addition 080.79137 37800 44,115 080 190 - Mid-Tex Gas Division Addition 080.79150 37602 124,497 080 190 - Mid-Tex Gas Division Addition 080.79150 38000 13,833 080 190 - Mid-Tex Gas Division Addition 080.79156 37602 17,482 080 190 - Mid-Tex Gas Division Addition 080.79159 37602 167,114 080 190 - Mid-Tex Gas Division Addition 080.79159 37800 71,620 080 190 - Mid-Tex Gas Division Addition 080.79161 37602 15,312 080 190 - Mid-Tex Gas Division Addition 080.79177 37602 93,025 080 190 - Mid-Tex Gas Division Addition 080.79180 37600 85,296 080 190 - Mid-Tex Gas Division Addition 080.79180 37601 36,556 080 190 - Mid-Tex Gas Division Addition 080.79183 37602 19,541 080 190 - Mid-Tex Gas Division Addition 080.79184 37602 135,654 080 190 - Mid-Tex Gas Division Addition 080.79184 38000 7,139 080 190 - Mid-Tex Gas Division Addition 080.79187 37602 68,505 080 190 - Mid-Tex Gas Division Addition 080.79209 37602 63,694 080 190 - Mid-Tex Gas Division Addition 080.79217 37602 3,733 080 190 - Mid-Tex Gas Division Addition 080.79219 37602 4,365 080 190 - Mid-Tex Gas Division Addition 080.79220 39000 23,320 080 190 - Mid-Tex Gas Division Addition 080.79226 37602 42,482 080 190 - Mid-Tex Gas Division Addition 080.79226 38000 22,875 080 190 - Mid-Tex Gas Division Addition 080.79228 37602 78,032 080 190 - Mid-Tex Gas Division Addition 080.79228 38000 4,107 MTX Additions by FERC Page 100 of 101 498 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Addition 080.79253 37800 3,570 080 190 - Mid-Tex Gas Division Addition 080.79276 39400 2,788 080 190 - Mid-Tex Gas Division Addition 080.79280 37602 215,851 080 190 - Mid-Tex Gas Division Addition 080.79288 37602 846 080 190 - Mid-Tex Gas Division Addition 080.79331 39400 28,932 080 190 - Mid-Tex Gas Division Addition 080.79354 37602 - 080 190 - Mid-Tex Gas Division Addition 080.79371 37601 629,660 080 190 - Mid-Tex Gas Division Addition 080.79374 37602 157,293 080 190 - Mid-Tex Gas Division Addition 080.79374 38000 23,504 080 190 - Mid-Tex Gas Division Addition 080.79388 37602 40,569 080 190 - Mid-Tex Gas Division Addition 080.79409 37602 92,098 080 190 - Mid-Tex Gas Division Addition 080.79411 37602 612,036 080 190 - Mid-Tex Gas Division Addition 080.79411 38000 25,502 080 190 - Mid-Tex Gas Division Addition 080.79421 37602 12,900 080 190 - Mid-Tex Gas Division Addition 080.79421 38000 130 080 190 - Mid-Tex Gas Division Addition 080.79424 37602 188,912 080 190 - Mid-Tex Gas Division Addition 080.79424 38000 47,228 080 190 - Mid-Tex Gas Division Addition 080.79433 37602 8,893 080 190 - Mid-Tex Gas Division Addition 080.79440 37602 123,182 080 190 - Mid-Tex Gas Division Addition 080.79446 37602 65,372 080 190 - Mid-Tex Gas Division Addition 080.79485 37800 7,605 080 190 - Mid-Tex Gas Division Addition 080.79489 37602 3,016 080 190 - Mid-Tex Gas Division Addition 080.79518 37602 27,803 080 190 - Mid-Tex Gas Division Addition 080.79519 39400 16,908 080 190 - Mid-Tex Gas Division Addition 080.79524 37602 35,336 080 190 - Mid-Tex Gas Division Addition 080.79529 37602 39,436 080 190 - Mid-Tex Gas Division Addition 080.79529 37800 26,291 080 190 - Mid-Tex Gas Division Addition 080.79546 37602 63,824 080 190 - Mid-Tex Gas Division Addition 080.79546 38000 645 080 190 - Mid-Tex Gas Division Addition 080.79551 37602 33,894 080 190 - Mid-Tex Gas Division Addition 080.79553 39000 230,837 080 190 - Mid-Tex Gas Division Addition 080.79557 37602 93,258 080 190 - Mid-Tex Gas Division Addition 080.79557 38000 4,908 080 190 - Mid-Tex Gas Division Addition 080.79565 37602 89,566 080 190 - Mid-Tex Gas Division Addition 080.79565 38000 15,806 080 190 - Mid-Tex Gas Division Addition 080.79573 37602 61,896 080 190 - Mid-Tex Gas Division Addition 080.79575 37602 97,958 080 190 - Mid-Tex Gas Division Addition 080.79617 37602 32,219 080 190 - Mid-Tex Gas Division Addition 080.79617 37800 75,178 080 190 - Mid-Tex Gas Division Addition 080.79655 37602 13,490 080 190 - Mid-Tex Gas Division Addition 080.79657 37602 5,458 080 190 - Mid-Tex Gas Division Addition 080.79694 39400 9,068 080 190 - Mid-Tex Gas Division Addition 080.79704 37800 5,325 080 190 - Mid-Tex Gas Division Addition 080.79706 37602 162,205 080 190 - Mid-Tex Gas Division Addition 080.79706 38000 8,537 080 190 - Mid-Tex Gas Division Addition 080.79727 37602 40,606 080 190 - Mid-Tex Gas Division Addition 080.79731 37601 144,327 080 190 - Mid-Tex Gas Division Addition 080.79744 37602 79,855 080 190 - Mid-Tex Gas Division Addition 080.79744 38000 4,203 080 190 - Mid-Tex Gas Division Addition 080.79772 39906 2,835 080 190 - Mid-Tex Gas Division Addition 080.79781 37602 77,198 080 190 - Mid-Tex Gas Division Addition 080.79781 38000 13,623 080 190 - Mid-Tex Gas Division Addition 080.79808 37602 16,245 080 190 - Mid-Tex Gas Division Addition 080.79824 37602 4,256 080 190 - Mid-Tex Gas Division Addition 080.79842 37602 171 080 190 - Mid-Tex Gas Division Addition 080.79842 38000 9 080 190 - Mid-Tex Gas Division Addition 080.79846 37602 22,619 080 190 - Mid-Tex Gas Division Addition 080.79846 37800 137,332 080 190 - Mid-Tex Gas Division Addition 080.79846 38000 1,616 080 190 - Mid-Tex Gas Division Addition 080.79851 37602 22,630 080 190 - Mid-Tex Gas Division Addition 080.79856 37602 550,781 080 190 - Mid-Tex Gas Division Addition 080.79856 38000 28,989 080 190 - Mid-Tex Gas Division Addition 080.79865 39400 1,329 080 190 - Mid-Tex Gas Division Addition 080.79901 37602 22,965 080 190 - Mid-Tex Gas Division Addition 080.79901 38000 1,209 080 190 - Mid-Tex Gas Division Addition 080.79933 37601 564,098 080 190 - Mid-Tex Gas Division Addition 080.79938 37601 2,347 080 190 - Mid-Tex Gas Division Addition 080.79938 38000 587 080 190 - Mid-Tex Gas Division Addition 080.79944 37602 21,901 080 190 - Mid-Tex Gas Division Addition 080.79944 38000 913 080 190 - Mid-Tex Gas Division Addition 080.79963 37602 22,413 080 190 - Mid-Tex Gas Division Addition 080.79982 37602 19,687 080 190 - Mid-Tex Gas Division Addition 080.80084 37602 58,602 080 190 - Mid-Tex Gas Division Addition 080.80088 39000 47,880 080 190 - Mid-Tex Gas Division Addition 080.80121 39906 2,439 080 190 - Mid-Tex Gas Division Addition 080.80169 37602 1,617 080 190 - Mid-Tex Gas Division Addition 080.80174 37602 256,851 080 190 - Mid-Tex Gas Division Addition 080.80302 39400 57,374 080 190 - Mid-Tex Gas Division Addition 080.80369 39000 5,124 080 190 - Mid-Tex Gas Division Addition 080.80448 39000 13,437 Total Mid-Tex Division Additions 1,063,846,551 MTX Additions by FERC Page 101 of 101 499 Item 10. ATMOS ENERGY CORP., MID-TEX DIVISION INTERIM RATE ADJUSTMENT APPLICATION PROJECT REPORT 2022 RETIREMENTS 500 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT MTX RETIREMENTS 1 080.49148 (117,871) INSTALL 11,500 FEET OF 24 INCH STEEL ALONG DT3 AT MOCKINGBIRD AND ABANDON 8,895 FEET OF 24 INCH AND 3,900 FEET OF 20 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 2 080.52108 (31,380) RELOCATE FACILITIES. INSTALL 485 FEET OF 2 INCH POLY AND 6490 FEET OF 6 INCH POLY; AND 800 FEET OF 10 INCH STEEL CASING ALONG BONNIE BRAE STREET AND ABANDON 490 FEET OF 2 INCH POLY, 935 FEET OF 4 INCH POLY AND 5,765 FEET OF 4 INCH STEEL TO ACCOMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY 3 080.54137 (146) INSTALL 8097 FEET OF 4 INCH POLY ALONG THE STREETS OF QUAIL HOLLOW PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WESTLAKE GROWTH 4 080.56871 136 FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY COMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY 5 080.58753 (3,200) RELOCATE FACILITIES. INSTALL 396 FEET OF 2 INCH, 306 FEET OF 6 INCH, AND 248 FEET OF 8 INCH POLY AND ABANDON 36 FEET OF 2 INCH POLY, 240 FEET OF 2 INCH, 289 FEET OF 6 INCH AND 204 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY 6 080.60447 (17,311) INSTALL 2,000 FEET OF 6 INCH, 40 FEET OF 4 INCH, AND 40 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #04 ALONG STATE HIGHWAY 114 AND ABANDON 250 FEET OF 6 INCH, 1,200 FEET OF 4 INCH POLY AND 550 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION #04.ALL CUSTOMERS SOUTHLAKE SYSTEM IMPROVEMENT 7 080.61247 (17,437) RELOCATE FACILITIES. INSTALL 2,187 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY AND ABANDON 140 FEET OF 6 INCH, 2,045 FEET OF 4 INCH, 30 FEET OF 3 INCH AND 2,150 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES 8 080.61594 (3,924,367) DALLAS CAST IRON REPLACEMENT FUNCTIONAL PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 9 080.61595 (451,919) FUNCTIONAL FORT WORTH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 10 080.62093 514 RELOCATE FACILITIES. INSTALL 402 FEET OF 6 INCH POLY, 2,226 FEET OF 4 INCH POLY, 10 FEET OF 2 INCH POLY AND ABANDON 328 FEET OF 4 INCH POLY AND 20 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF SANGER PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER RELOCATION OF FACILITIES 11 080.62714 30,854 RELOCATE FACILITIES. INSTALL 1011 FEET OF 4 INCH AND 989 FEET OF 6 INCH POLY ALONG FM 2818 AND ABANDON 238 FEET OF 4 INCH AND 500 FEET OF 6 INCH POLY AND 219 FEET OF 4 INCH AND 728 FEET OF 6 INCH STEEL TO ACCOMMODATE TXDOT HIGHWAY IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209.ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY 12 080.62738 (477,471) RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH, 809 FEET OF 4 INCH AND 2996 FEET OF 6 INCH POLY ALONG EAST ELM STREET AND ABANDON 781 FEET OF 3 INCH AND 470 FEET OF 4 INCH AND 1680 FEET OF 6 INCH STEEL AND 1380 FEET OF 4 INCH AND 500 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY 13 080.63644 (100,921) INSTALL 9504 FEET OF 10 INCH STEEL ALONG ALONG NORTH AIRFIELD DRIVE AND ABANDON 8500 FEET OF 10 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY 14 080.63945 (44,897) RELOCATE FACILITIES. INSTALL 1265 FEET OF 6 INCH AND 450 FEET OF 2 INCH POLY, 200 FEET OF 10 INCH STEEL CASING AND DISTRICT REGULATOR STATION #009 ALONG NORTHEAST MAIN AND ABAONDON 1265 FEET OF 6 INCH STEEL AND 2 DRSS TO ACCOMODATE THE CITY OF ENNIS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ENNIS SYSTEM INTEGRITY 15 080.64366 1,302 RELOCATE FACILITIES. INSTALL NEW DRS ON TUCASA ST. AND ABANDON 330 FEET OF 8 INCH STEEL, 481 FEET OF 6 INCH STEEL AND 500 FEET OF 4 INCH IP PE ALONG GRAUWYLER RD. TO ACCOMMODATE TX-DOT CAPITAL HIGHWAY PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES 16 080.64399 (7,123) RELOCATE FACILITIES. INSTALL 2,775 FEET OF 4 INCH POLY ALONG RED BIRD MALL AND ABANDON 1,750 FEET OF 2 INCH AND 1,060 FEET OF 4 INCH POLY TO ACCOMMODATE NEW CONSTRUCTION.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 17 080.65103 (634,423) RELOCATE FACILITIES. INSTALL 837 FEET OF 12 INCH AND 881 FEET OF 20 INCH STEEL ALONG MAIN STREET IN FORT WORTH AND ABANDON 269 FEET OF 12 INCH AND 244 FEET OF 18 INCH STEEL TO ACCOMODATE BNSF RAILWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 18 080.65275 1,827 RELOCATE FACILITIES. INSTALL 2780 FEET OF 4 INCH POLY AND 250 FEET OF 4 INCH STEEL AND 300 FEET OF 2 INCH POLY ALONG SH 205 AND ABANDON 2775 FEET OF 2 INCH POLY TO ACCOMMODATE TXDOT IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAVON RELOCATION OF FACILITIES 19 080.65516 (977) INSTALL DISTRICT REGULATOR STATION 012 IN CISCO, 01 IN MORAN, 02 IN CLYDE, 02 IN TRENT AND 02 IN CARBON AND ABANDON DISTRICT REGULATOR STATION 012 IN CISCO, 01 IN MORAN, 02 IN CLYDE, 02 IN TRENT AND 02 IN CARBON IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS CARBON SYSTEM INTEGRITY 20 080.65651 (298) INSTALL AND ABANDON S203 DRS IN THE FOLLOWING LOCATIONS: DRS03 IN WHITEWRIGHT, DRS02 IN LINDSAY, AND DRS10 IN GAINESVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LINDSAY SYSTEM INTEGRITY 21 080.65674 (22,556) INSTALL TWO NEW LOW PRESSURE DISTRICT REGULATOR STATIONS, 25 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATIONS FARMERSVILLE DISTRICT REGULATOR STATIONS 11 AND 12, 22 FEET OF 2 INCH STEEL , 13 FEET OF 4 INCH STEEL 10 FEET OF 4 INCH POLY AND 13 FEET OF 4 INCH STEEL MAIN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY 22 080.65697 (10) REPLACE (4) DISTRICT REGUATOR STATIONS IN SAGINAW IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY 23 080.65704 (1,900) INSTALL NEVADA DISTRICT REGULATOR STATION #2, FATE DISTRICT REGULATOR STATION #1 AND FORNEY DISTRICT REGULATOR STATION #6. REPLACE NEVADA DISTRICT REGULATOR STATION #2, FATE DISTRICT REGULATOR STATION #1 AND FORNEY DISTRICT REGULATOR STATION #6 ALL CUSTOMERS NEVADA SYSTEM INTEGRITY 24 080.65744 (146,628) INSTALL DISTRICT REGULATOR STATIONS #010, #011, #017, AND #067A ALONG THE STREETS OF ABILENE AND ABANDON DISTRICT REGULATOR STATIONS #010, #011, #017, AND #067A.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 25 080.65795 (3,440) INSTALL 1500 FEET OF 2 INCH; POLY ALONG IOOF STREET AND ABANDON 1020 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY 26 080.65805 (16,339) INSTALL WESTMINISTER DISTRICT REGULATOR STATION # 1, ANNA DISTRICT REGULATOR STATION #3, ANNA DISTRICT REGULATOR STATION #5, 30 FEET OF 2 INCH POLY, 70 FEET OF 4 INCH POLY AND ABANDON WESTMINISTER DISTRICT REGULATOR STATION #1, ANNA DISTRICT REGULATOR STATION #3, ANNA DISTRICT REGULATOR STATION #5, 28 FEET OF 2 INCH STEEL, 10 FEET OF 3 INCH STEEL, 19 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANNA SYSTEM INTEGRITY 27 080.65807 683 INSTALL DISTRICT REGULATOR STATIONS 01,02,03,10 AND ABANDON FOUR DISTRICT REGULATOR STATIONS 01,02,03,10 ALONG THE STREETS OF PALESTINE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE SYSTEM INTEGRITY 28 080.65821 (3,016) INSTALL DISTRICT REGULATOR STATION 07, 11 12 AND ABANDON DISTRICT REGULATOR STATION 07, 11, 12 ALONG THE STREETS OF DENTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY 29 080.65842 (10,436) INSTALL DISTRICT REGULATOR STATION IN GRAPEVINE AND ABANDON DISTRICT REGULATOR STATION #01, #04, AND #07. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY 30 080.65858 (47,514) INSTALL DISTRICT REGULATOR STATION #04, #11, #13. #14 ALONG THE STREETS OF SAN ANGELO AND ABANDON DISTRICT REGULATOR STATION #04, #11, #13. #14 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY 31 080.65862 (16,839) INSTALL DISTRICT REGULATOR STATION #15, #43, #52. #62, #81 ALONG THE STREETS OF SAN ANGELO AND ABANDON DISTRICT REGULATOR STATION #15, #43, #52. #62, #81 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY MTX Retirements Page 1 of 45 501 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 32 080.65865 (2,084) INSTALL DISTRICT REGULATOR STATION #20 AND 270 FEET OF 4 INCH POLY ALONG CHURCH STREET AND ABANDON DISTRICT REGULATOR STATION #20 AND 260 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY 33 080.65879 12,878 RELOCATE FACILITIES. INSTALL 2200 FEET OF 4 INCH AND 350 FEET OF 2 INCH POLY ALONG SH78 AND ABANDON 1190 FEET OF 4 INCH AND 780 FEET OF 6 INCH STEEL TO ACCOMMODATE TXDOT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 34 080.66044 (102,301) RELOCATE FACILITIES. INSTALL 1000 FEET OF 30 INCH STEEL ALONG CANADA DRIVE AND ABANDON 850 FEET OF 30 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 35 080.66262 (4,237) INSTALL 1487 FEET OF 4 INCH POLY AND ABANDON 158 FEET OF 2 INCH STEEL, 301 FEET OF 2 INCH POLY, 11 FEET OF 4 INCH POLY ALONG LOVE CIRCLE ACROSS STATE HIGHWAY 199 DUE TO CITY CONFLICT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 36 080.66557 (6,011) RELOCATE FACILITIES. INSTALL 700 FEET OF 12 INCH STEEL ALONG HIGHWAY 80 AND ABANDON 700 FEET OF 12 INCH STEEL TO ACCOMODATE UNION PACIFIC BRIDGE PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 37 080.66564 (793) REPLACE DISTRICT REGULATOR STATION 02 AND 04 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BAIRD SYSTEM INTEGRITY 38 080.66654 (9,561) INSTALL AND ABANDON DISTRICT REGULATOR STATION #03,09, 14, 17 IN GORMAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORMAN SYSTEM INTEGRITY 39 080.66666 (5,532,859) INSTALL 5,100 FEET OF 16 INCH STEEL OF LINE C16 IN EULESS AND ABANDON 5,100 FEET OF 16 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS EULESS SYSTEM INTEGRITY 40 080.66673 (446) INSTALL 300 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY, DRS 18, DRS 26, DRS 30 AND DRS 38 AND ABANDON 50 FEET OF 4 INCH STEEL, 25 FEET OF 3 INCH STEEL, 50 FEET OF 2 INCH POLY, DRS 18, DRS 26, DRS 30, AND DRS 38 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY 41 080.66728 (3,108) INSTALL DISTRICT REGULATOR STATIONS ALONG STREETS OF STEPHENVILLE AND ABANDON DISTRCT REGULATOR STATION 01 AND DISTRICT REGULATOR STATION 09 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY 42 080.66755 (201) INSTALL 1400 FEET OF 2 INCH POLY ALONG GOWDY STREET AND ABANDON 1340 FEET OF 3 INCH AND 210 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 06 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITEWRIGHT SYSTEM INTEGRITY 43 080.66775 1,724 INSTALL 1600 FEET OF 20 INCH STEEL ALONG SCYENE ROAD AND DIXON AVENUE AND ABANDON 1600 FEET OF 24 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 44 080.66809 (16,624) INSTALL 250 FEET OF 6 INCH STEEL ALONG AUTUMN CIRCLE IN COLLEGE STATION AND ABANDON 250 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY 45 080.67075 (5,826) ABANDON 1055 FEET OF 3 INCH STEEL AND 4100 FEET OF 3 INCH POLY ALONG STREETS IN BREEZY OAKS MOBILE HOME PARK IN TARRANT COUNTY MANSFIELD TEXAS. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY 46 080.67347 (136) RELOCATE FACILITIES. INSTALL 1300 FEET OF 2 INCH POLY ALONG MEADOW CREST DRIVE AND ABANDON 1300 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 47 080.67748 (888) RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH POLY ALONG APRIL HILL ALLEY AND ABANDON 800 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 48 080.67855 (3,236) RELOCATE FACILITIES. INSTALL 2699 FEET OF 4 INCH POLY AND ABANDON 2655 FEET OF 4 INCH POLY TO ACCOMODATE TXDOT IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LLANO RELOCATION OF FACILITIES 49 080.68373 (38,240) RELOCATE FACILITIES. INSTALL 600 FEET OF 6-INCH POLY AND ABANDON 1,342 FEET OF 6 INCH POLY AND 221 FEET OF 6 INCH COATED STEEL WITHIN THE ROW OF MUMFORD ROAD WITHIN THE CITY OF BRYAN, BRAZOS COUNTY DUE TO APT PROJECT. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES 50 080.68429 639,052 RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH AND 1000 FEET OF 6 INCH POLY AND 800 FEET OF 16 INCH STEEL ALONG CLEBURNE CROWLEY RD TO CAPPS ST AND ABANDON 300 FEET OF 4 INCH POLY AND 250 FEET OF 6 INCH STEEL AND 120 FEET TO ACCOMMODATE CITY OF CLEBURNE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES 51 080.68474 (1,187) INSTALL 1590 FEET OF 2 INCH POLY AND ABANDON 2079 FEET OF 4 INCH STEEL AND 428 FEET OF 4 INCH POLY ALONG DUVAL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 52 080.68503 (897) INSTALL 750 FEET OF 2 INCH POLY ALONG CONCH STREET AND ABANDON 750 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM SYSTEM INTEGRITY 53 080.68576 (1,839) RELOCATE FACILITIES. INSTALL 5000 FEET OF 16 INCH STEEL ALONG PIPELINE ROAD AND ABANDON 5000 FEET OF 16 INCH STEEL TO ACCOMMODATE CITY OF EULESS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS EULESS RELOCATION OF FACILITIES 54 080.68954 (23,690) INSTALL 40 FEET OF 8 INCH, 80 FEET OF 12 INCH AND 40 FEET OF 20 INCH STEEL AND DISTRICT REGULATOR STATION ALONG FORD ROAD AND ABANDON 120 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 55 080.69221 (90,255) RELOCATE FACILITIES. INSTALL 3,226 FEET OF 6 INCH AND 2,251 FEET OF 8 INCH POLY, 170 FEET OF 10 INCH AND 160 FEET OF 12 INCH STEEL AND ABANDON 2,151 FEET OF 8 INCH, 3,116 FEET OF 4 INCH POLY DUE TO TXDOT ROAD AND DRAINAGE IMPROVEMENTS PROJECT IN ROCKWALL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY 56 080.69341 (4,265) RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH AND 990 FEET OF 4 INCH POLY ALONG BUSINESS 78 AND ABANDON 63 FEET OF 1.25 INCH, 45 FEET OF 2 INCH STEEL, 930 FEET OF 4 INCH STEEL AND 27 FEET OF 4 INCH POLY TO ACCOMMODATE FARMERSVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FARMERSVILLE RELOCATION OF FACILITIES 57 080.69404 (1,003) RELOCATE FACILITIES. INSTALL 830 FEET OF 4 INCH POLY AND ABANDON 680 FEET OF 4 INCH AND 140 FEET OF 2 INCH POLY ALONG LBJ TO ACCOMMODATE TXDOT PROJECT. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES 58 080.69414 (1,854) RELOCATE FACILITIES. INSTALL 110 FEET OF 4 INCH POLY AND ABANDON 105 FEET OF 4 INCH POLY ALONG GALLOWAY AVENUE TO ACCOMMODATE STORM DRAIN TXDOT PROJECT.ALL CUSTOMERS MESQUITE RELOCATION OF FACILITIES 59 080.69599 (51) INSTALL DISTRICT REGULATOR STATION 49 ALONG THE STREETS OF N 42ND STREET AND SANGER STREET IN WACO AND ABANDON DISTRICT REGULATOR STATION 49 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS WACO SYSTEM INTEGRITY 60 080.69629 759 RELOCATE FACILITIES. INSTALL 314 FEET OF 6 INCH POLY AND ABANDON 294 FEET OF 6 INCH POLY ALONG CUSTER ROAD. ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES 61 080.69719 120 RELOCATE FACILITIES. INSTALL 400 FEET OF 6 INCH POLY 4900 FEET OF 4 INCH POLY ALONG STONEWALL STREET AND ABANDON 175 FEET OF 6 INCH, 1680 FEET OF 4 INCH STEEL,50 FEET OF 4 INCH POLY, 2865 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF GREENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY 62 080.69878 493 RELOCATE FACILITIES. INSTALL 540 FEET OF 6 INCH POLY AND ABANDON 530 FEET OF 6 INCH POLY ALONG LEGACY DRIVE TO ACCOMMODATE TRAMMELL CROWS TURN LANE EXTENSION.ALL CUSTOMERS PLANO RELOCATION OF FACILITIES 63 080.69932 (783) INSTALL 799 FEET OF 4 INCH AND 183 FEET OF 2 INCH POLY AND ABANDON 740 FEET OF 3 INCH AND 228 FEET OF 2 INCH POLY ALONG PLANO PARKWAY. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES 64 080.70046 (12,971) RELOCATE FACILITIES. INSTALL 1300 FEET OF 2 INCH POLY ALONG RYANRIDGE STREET AND ABANDON 1300 FEET OF 2 INCH STEEL TO ACCOMODATE THE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 65 080.70161 (536) RELOCATE FACILITIES. INSTALL 251 FEET OF 2 INCH POLY AND ABANDON 243 FEET OF 2 INCH STEEL TO ACCOMMODATE DART RAIL PROJECT. ALL CUSTOMERS ADDISON RELOCATION OF FACILITIES MTX Retirements Page 2 of 45 502 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 66 080.70193 (5,431) REPLACE AMLD MAINS 5 TO 250 IN THE NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 67 080.70194 (162,015) REPLACE AMLD MAINS 5 TO 250 IN THE NORTH CENTRAL REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY 68 080.70195 (492,465) REPLACE AMLD MAINS 5 TO 250 IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD SYSTEM INTEGRITY 69 080.70196 (71,465) REPLACE AMLD MAINS 5 TO 250 IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 70 080.70197 (2,271) REPLACE AMLD MAINS 5 TO 250 IN THE SOUTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 71 080.70198 (493) REPLACE AMLD MAINS 5 TO 250 IN THE SOUTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY 72 080.70199 (1,606) REPLACE AMLD MAINS 5 TO 250 IN THE WEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 73 080.70200 (1,945) REPLACE AMLD MAINS 5 TO 250 IN THE WEST ARLINGTON IRVING REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 74 080.70201 (43,303) REPLACE AMLD MAINS 5 TO 250 IN THE WEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 75 080.70202 (55,398) REPLACE AMLD SERVICE LINES IN THE NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY 76 080.70203 (195,109) REPLACE SERVICE LINES IN WICHITA FALLS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 77 080.70204 (138,106) REPLACE SERVICE LINES IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 78 080.70205 (37,376) REPLACE SERVICE LINES IN MCKINNEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY 79 080.70206 (48,162) REPLACE SERVICE LINES IN WACO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY 80 080.70207 (4,691) REPLACE SERVICE LINES IN FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 81 080.70208 (23,295) REPLACE SERVICE LINES IN ARLINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 82 080.70209 (4,599) REPLACE SERVICE LINES IN ROUND ROCK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY 83 080.70210 (134,626) REPLACE SERVICE LINES IN ABILENE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 84 080.70211 (2,556) REPLACE MAIN 5-250' IN THE NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY 85 080.70212 (59,812) REPLACE MAIN 5-250' IN THE NORTH CENTRAL REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY 86 080.70213 (18,394) REPLACE MAIN 5-250' IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD SYSTEM INTEGRITY 87 080.70214 (14,285) REPLACE MAIN 5-250' IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 88 080.70215 (223) REPLACE MAIN 5-250' IN THE SOUTH EAST REGION DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 89 080.70216 (196) REPLACE MAIN 5-250' IN THE SOUTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY 90 080.70217 (111,070) REPLACE MAIN 5-250' IN THE WEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 91 080.70218 (1,532) REPLACE MAIN 5-250' IN THE WEST ARLINGTON IRVING REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 92 080.70219 (33,749) REPLACE MAIN 5-250' IN THE WEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY 93 080.70220 (150,221) REPLACE SERVICE LINES IN THE NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY 94 080.70221 (110,564) REPLACE SERVICE LINES IN THE NORTH CENTRAL REGION ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY 95 080.70222 (196,314) REPLACE SERVICE LINES IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD SYSTEM INTEGRITY 96 080.70223 (562,015) REPLACE SERVICE LINES IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY 97 080.70224 (180,808) REPLACE SERVICE LINES IN THE SOUTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY 98 080.70225 (47,411) REPLACE SERVICE LINES IN THE SOUTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY 99 080.70226 (180,865) REPLACE SERVICE LINES IN THE WEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 100 080.70227 (73,608) REPLACE SERVICE LINES IN THE WEST ARLINGTON IRVING REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY 101 080.70228 (137,189) REPLACE SERVICE LINES IN THE WEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 102 080.70229 (1,569,059) REPLACE METERS IN THE NORTH EAST REGION DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY 103 080.70230 (2,144,142) REPLACE METERS IN THE NORTH CENTRAL REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY 104 080.70231 (1,135,191) REPLACE METERS IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 105 080.70232 (2,667,755) REPLACE METERS IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY 106 080.70233 (2,537,569) REPLACE METERS IN THE SOUTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 107 080.70234 (880,360) REPLACE METERS IN THE SOUTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY 108 080.70235 (1,147,222) REPLACE METERS IN THE WEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 109 080.70236 (860,417) REPLACE METERS IN THE WEST ARLINGTON IRVING REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 110 080.70237 (1,102,999) REPLACE METERS IN THE WEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 111 080.70252 (1,000) INSTALL 400 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 02 AND 300 FEET OF 2 INCH POLY AND 1331 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLDEN SYSTEM INTEGRITY 112 080.70260 (609) INSTALL 320 FEET OF 2 INCH POLY AND INSTALL DISTRICT REGULATOR STATION 07,12 AND 23 ALONG W 16TH STREET AND ABANDON 540 FEET OF 2 INCH STEEL, 130 FEET OF 2 INCH POLY, 14 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION 07, 12, AND 23 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY 113 080.70307 (81,264) REPLACE SERVICE LINES IN THE NORTH EAST DISTRICT. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 114 080.70308 (68,160) NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN NORTH CENTRAL DISTRICT. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY 115 080.70309 (93,308) NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN NORTH WEST DISTRICT. ALL CUSTOMERS BOYD SYSTEM INTEGRITY 116 080.70310 (468,571) NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN SOUTH DALLAS. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 117 080.70311 (219,107) NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN SOUTH EAST DISTRICT. ALL CUSTOMERS WACO SYSTEM INTEGRITY 118 080.70312 (77,471) NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN SOUTH WEST DISTRICT. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY 119 080.70313 (104,352) NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN WEST FORT WORTH. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 120 080.70314 (105,846) NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN WEST ARLINGTON IRVING. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 121 080.70315 (71,030) NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN WEST DISTRICT. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 122 080.70316 (4,514) NON GROWTH FUNCTIONAL MAINS IN NORTH EAST. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 123 080.70317 (9,795) NON GROWTH FUNCTIONAL FOR THE REPLACEMENT OF MAINS IN NORTH CENTRAL REGION.ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY 124 080.70318 (9,872) NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN NORTH WEST REGION. ALL CUSTOMERS BOYD SYSTEM INTEGRITY 125 080.70319 (6,641) NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN SOUTH DALLAS. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 126 080.70320 (9,306) NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN SOUTH EAST REGION. ALL CUSTOMERS WACO SYSTEM INTEGRITY MTX Retirements Page 3 of 45 503 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 127 080.70321 (1,161) NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN SOUTH WEST REGION. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY 128 080.70322 (5,596) NON GROWTH FUNCTIONAL MAINS PROJECT IN WEST FORT WORTH. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 129 080.70323 (3,902) NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN WEST ARLINGTON REGION.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 130 080.70324 (2,416) NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN WEST REGION. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 131 080.70325 (280,615) GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN NORTH EAST REGION.ALL CUSTOMERS GARLAND GROWTH 132 080.70326 (379,231) GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN NORTH CENTRAL REGION.ALL CUSTOMERS MCKINNEY GROWTH 133 080.70327 (362,678) GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN NORTH WEST REGION.ALL CUSTOMERS BOYD GROWTH 134 080.70328 (565,784) GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN SOUTH DALLAS REGION.ALL CUSTOMERS DALLAS GROWTH 135 080.70329 (842,124) GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN SOUTH EAST REGION.ALL CUSTOMERS WACO GROWTH 136 080.70330 (158,587) GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN SOUTH WEST REGION.ALL CUSTOMERS ROUND ROCK GROWTH 137 080.70331 (386,405) GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN WEST FORT WORTH REGION.ALL CUSTOMERS FORT WORTH GROWTH 138 080.70332 (307,919) GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN WEST ARLINGTON REGION.ALL CUSTOMERS ARLINGTON GROWTH 139 080.70333 (440,710) NON GROWTH FUNCTIONAL METERS IN WEST DISTRICT. ALL CUSTOMERS ABILENE GROWTH 140 080.70515 2,474 RELOCATE FACILITIES. INSTALL 2200 FEET OF 4 INCH POLY AND 900 FEET OF 2 INCH POLY ALONG CLAYTON ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES 141 080.70526 (72) INSTALL DISTRICT REGULATOR STATION 06 ALONG ALONG 2ND STREET AND DISTRICT REGULATOR STATION 06 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS QUANAH SYSTEM INTEGRITY 142 080.70527 36 INSTALL DISTRICT REGULATOR STATION 12 ALONG STARR STREET AND ABANDON DISTRICT REGULATOR STATION 12 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS QUANAH SYSTEM INTEGRITY 143 080.70534 (255) INSTALL 50 FEET OF 2 INCH POLY, 120 FEET OF 4 INCH POLY, 175 FEET OF 6 INCH POLY, DISTRICT REGULATOR STATION 08 ALONG 4TH STREET NE AND ABANDON 230 FEET OF 8 INCH STEEL, 25 FEET OF 6 INCH STEEL, 10 FEET OF 4 INCH STEEL, AND 80 FEET OF 3 INCH POLY, DISTRICT REGULATOR STATION 08 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY 144 080.70540 (263) INSTALL 40 FEET OF 4 INCH, 30 FEET OF 3 INCH AND 100 FEET OF 6 INCH POLY, DISTRICT REGULATOR STATION 08 ALONG MORTON STREET AND ABANDON DISTRICT REGULATOR STATION 08 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY 145 080.70541 163 INSTALL 910 FEET OF 2 INCH POLY AND ABANDON 747 FEET OF 2 INCH STEEL AND DRS 09 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENISON SYSTEM INTEGRITY 146 080.70545 (361) INSTALL 60 FEET OF 2 INCH POLY, 80 FEET OF 4 INCH POLY, DISTRICT REGULATOR STATION 03 ALONG GARDNER STREET AND ABANDON 222 FEET OF 3 INCH STEEL, 10 FEET OF 2 INCH STEEL, DISTRICT REGULATOR STATION 03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITEWRIGHT SYSTEM INTEGRITY 147 080.70548 3,213 INSTALL 2900 FEET OF 2 INCH AND 225 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 02, 700 FEET OF 4 INCH, 2512 FEET OF 3 INCH, AND 44 FEET OF 2 INCH STEEL AND 2 FEET OF 2 INCH AND 100 FEET OF 1.25 INCH POLY ALONG THE STREETS OF LEONARD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS LEONARD SYSTEM INTEGRITY 148 080.70551 (7,745) INSTALL 2300 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 05, 683 FEET OF 4 INCH, 2469 FEET OF 3 INCH, AND 301 FEET OF 2 INCH STEEL AND 520 FEET OF POLY ALONG THE STREETS OF LEONARD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEONARD SYSTEM INTEGRITY 149 080.70552 (3,626) INSTALL DISTRICT REGULATOR STATION 01 ALONG GRIMES STREET AND BALLENTINE STREET AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY 150 080.70553 (1,482) INSTALL 400 FEET OF 4 INCH POLY, 25 FEET OF 2 INCH POLY, DISTRICT REGULATOR STATION 04 ALONG AUGUSTUS STREET AND ABANDON 433 FEET OF 2 INCH STEEL, DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS TRENTON SYSTEM INTEGRITY 151 080.70554 (101) INSTALL 920 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY ALONG SAUNDERS AND DISTRICT REGULATOR STATION ON 4TH AND ABANDON 335 FEET OF 3 INCH STEEL AND DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY 152 080.70555 (50) INSTALL 225 FEET OF 4 INCH POLY AND 2970 FEET OF 2 INCH POLY AND ABANDON 1,898 FEET OF 3 INCH STEEL, 553 FEET OF 4 INCH STEEL, 171 FEET OF 3 INCH POLY, 167 FEET OF 2 INCH POLY, 219 FEET OF 2 INCH STEEL ALONG NW FRONT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAVOY SYSTEM INTEGRITY 153 080.70564 413 RELOCATE FACILITIES. INSTALL 24 FEET OF 2 INCH POLY, 288 FEET OF 4 INCH POLY AND 1009 FEET OF 6 INCH POLY ALONG HARWOOD ROAD AND ABANDON 14 FEET OF 2 INCH STEEL, 93 FEET OF 3 INCH STEEL, 88 FEET OF 4 INCH STEEL AND 990 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF EULESS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY 154 080.70606 (6,652) RELOCATE FACILITIES. INSTALL 114 FEET OF 4 INCH POLY ALONG NORTH BELL AVENUE AND ABANDON 475 FEET OF 4 INCH STEEL, 20 FEET OF 3 INCH POLY AND 760 FEET OF 2 INCH POLY TO ACCOMODATE CITY OF DENTON UTILITY AND STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES 155 080.70611 (8,501) INSTALL DISTRICT REGULATOR STATION #8 AND 460 FEET OF 4 INCH AND 240 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION #8 AND 41 FEET OF 4 INCH STEEL AND 24 FEET OF 4 INCH, 132 FEET OF 6 INCH POLY ALONG BAYLOR STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 156 080.70618 (30,875) INSTALL DISTRICT REGULATOR STATION #66 AND 30 FEET OF 6 INCH POLY AND 250 FEET OF 6 INCH POLY AND ABANDON DISTRICT REGULATION STATION #66 AND 97 FEET OF 6 INCH POLY ALONG STREET OF WICHITA FALLS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 157 080.70619 (6,749) INSTALL DISTRICT REGULATOR STATION #67 AND INSTALL 4 INCH POLY ALONG FILLMORE STREET AND ABANDON DISTRICT REGULATOR STATION FISHER #S203&NBSP; AND 19 FEET OF 2 INCH STEEL AND 188 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 158 080.70620 (10,460) INSTALL DISTRICT REGULATOR STATION #83 AND 425 FEET OF 4 INCH, 130 FEET OF 6 INCH POLY AND ABANDON DISTRICT REGULATOR STATION #83, 248 FEET OF 6 INCH STEEL AND 3 FEET OF 6 INCH POLY ALONG SANTA FE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 159 080.70643 (66,042) INSTALL DISTRICT REGULATOR STATION # 17, 30 FEET OF 2 INCH, 225 FEET OF 6 INCH POLY AND ABANDON DISTRICT REGULATOR STATION #17, 64 FEET OF 2 INCH STEEL AND 139 FEET OF 4 INCH STEEL ALONG FULTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY 160 080.70644 (25,487) INSTALL 2777 FEET OF 2 INCH POLY ALONG BRADSHAW STREET AND ABANDON DISTRICT REGULATOR STATION 28, 1436 FEET OF 3 INCH POLY AND 1269 OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY 161 080.70686 (34,630) RELOCATE FACILITIES. INSTALL 335 FEET OF 4 INCH AND 4356 OF 2 INCH POLY AND ABANDON 2090 FEET OF 2 INCH AND 1252 FEET OF 3 INCH STEEL, 263 FEET OF 2 INCH, 699 FEET OF 3 INCH AND 128 FEET OF 4 INCH POLY ALONG THE STREETS OF KELLER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY 162 080.70702 355 RELOCATE FACILITIES. INSTALL 2300 FEET OF 4 INCH POLY ALONG STREETS OF DALLAS AND ABANDON 2200 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 163 080.70706 (1,528) ABANDON 276 FEET OF 2 INCH STEEL, 847 FEET OF 2 INCH POLY, 521 FEET OF 1.25 INCH POLY, 302 FEET OF 1 INCH STEEL, 197 FEET OF 1.25 STEEL, 20 FEET OF 2 INCH STEEL, 27 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION 05 ALONG WINKLER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORMAN SYSTEM INTEGRITY MTX Retirements Page 4 of 45 504 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 164 080.70735 (146) RELOCATE FACILITIES. INSTALL 1400 FEET OF 4 INCH POLY, 50 FEET OF 6 INCH POLY, 90 FEET OF 8 INCH POLY AND ABANDON 1400 FEET OF 4 INCH STEEL, 50 FEET OF 6 INCH STEEL, AND 90 FEET OF 8 STEEL ALONG OVERTON PARK TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES 165 080.70810 (12,094) RELOCATE FACILITIES. INSTALL 4,287 FEET OF 2 INCH POLY AND ABANDON 4,398 FEET OF 2 INCH POLY ALONG FM4 IN CLEBURNE DUE TO ACCOMOCATE TXDOT HIGHWAY IMPROVEMENTS AND STORM DRAIN EXTENSION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE RELOCATION OF FACILITIES 166 080.70840 303 RELOCATE FACILITIES. INSTALL 15 FEET OF 2 INCH AND 610 FEET OF 8 INCH POLY ALONG LIVE OAK AND ABANDON 625 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 167 080.70855 (1,087) INSTALL 5,540 FEET OF 6 INCH, 540 FEET OF 4 INCH POLY AND ABANDON 2,500 FEET OF 3 INCH STEEL, 540 FEET OF 4 INCH POLY, 350 FEET OF 8 INCH STEEL ALONG BECKLEY. ALL CUSTOMERS DALLAS SYSTEM IMPROVEMENT 168 080.70903 (205) INSTALL DISTRICT REGULATOR STATION 013 ALONG HOWARD STREET AND ABANDON DISTRICT REGULATOR STATION 013 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 169 080.70936 (1,455) RELOCATE FACILITIES. INSTALL 700 FEET OF 6 INCH POLY AND 132 FEET OF 12 INCH POLY AND 70 FEET OF 2 INCH POLY AND ABANDON 639 FEET OF 6 INCH POLY AND 80 FEET OF 12 INCH STEEL ALONG OAK GROVE ROAD TO ACCOMMODATE THE CITY OF FORT WORTH DRAINGE PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES 170 080.70954 123 INSTALL 4 INCH METER, 6 INCH REGULATOR AND RELIEF STATION, AND 25 FEET OF 6 INCH STEEL ALONG FOREST PARK ROAD AND ABANDON 25 FEET OF 4 INCH POLY. ALL CUSTOMERS DALLAS SYSTEM IMPROVEMENT 171 080.71018 1,101 RELOCATE FACILITIES. INSTALL 3565 FEET OF 4 INCH AND 3285 FEET OF 2 INCH POLY ALONG GLENN LANE AND MILAS LANE AND ABANDON 6850 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF GLENN HEIGHTS ROAD IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLENN HEIGHTS RELOCATION OF FACILITIES 172 080.71021 700 INSTALL 520 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY ALONG WEST PARKWAY AND ABANDON 377 FEET OF 3 INCH AND 230 FEET OF 2 INCH AND 20 FEET OF 4 INCH STEEL AND 54 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY 173 080.71031 (2,555) RELOCATE FACILITIES. INSTALL 524 FEET OF 2 INCH POLY AND ABANDON 507 FEET OF 2 INCH STEEL ALONG BATES STREET IN ACCORDANCE TO THE TEXAS RAILROAD COMMISSION RULE 8.209.ALL CUSTOMERS KELLER SYSTEM INTEGRITY 174 080.71033 (5,162) RELOCATE FACILITIES. INSTALL 3580 FEET OF 4 INCH POLY ALONG OLD HEARNE ROAD AND ABANDON 1465 FEET OF 4 INCH, 1383 FEET OF 3 INCH AND 98 FEET OF 2 INCH POLY AND 70 FEET OF 2 INCH AND 225 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES 175 080.71043 (7,638) INSTALL 3,600 FEET OF 3 INCH STEEL ALONG LINE U22 IN SEAGOVILLE AND ABANDON 3,600 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS MCCAULLEY SYSTEM INTEGRITY 176 080.71107 21 INSTALL 670 FEET OF 4 INCH POLY ALONG BONHAM STREET AND ABANDON 670 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY 177 080.71126 (8,450) INSTALL 2300 FEET OF 2 INCH POLY ALONG PEGGY LANE AND ABANDON 2300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 178 080.71129 842 RELOCATE FACILITIES. INSTALL 275 FEET OF 2 INCH, 480 FEET OF 4 INCH, 1000 FEET OF 6 INCH AND 305 FEET OF 8 INCH POLY ALONG SKILLMAN STREET AND ABANDON 690 FEET OF 2 INCH AND 220 FEET OF 3 INCH POLY AND 1390 FEET OF 4 INCH STEEL TO ACCOMMODATE TXDOT PROJECT. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 179 080.71130 (1,739) INSTALL 343 FEET OF 4 INCH POLY ALONG OAKMONT DRIVE AND ABANDON 337 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY 180 080.71168 (261) RELOCATE FACILITIES. INSTALL 175 FEET OF 2 INCH POLY ALONG ACCENT DRIVE AND ABANDON 135 FEET OF 2INCH POLY. ALL CUSTOMERS PLANO SYSTEM INTEGRITY 181 080.71174 (5,520) INSTALL 790 FEET OF 4 INCH AND 5 FEET OF 2 INCH POLY AND ABANDON 585 FEET OF 4 INCH AND 395 FEET OF 2 INCH POLY IN RED BIRD MALL. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 182 080.71177 (179,548) RELOCATE FACILITIES. INSTALL 874 FEET OF 2 INCH, 6104 FEET OF 4 INCH AND 2279 FEET OF 6 INCH POLY ALONG HIGHWAY 5 AND ABANDON DISTRICT REGULATOR STATION #3, 1143 FEET OF 1-1/4 & 2 INCH AND 3308 FEET OF 3 INCH STEEL AND 432 FEET OF 2 INCH POLY, 1619 FEET OF 3 POLY, 238 FEET OF 4 INCH POLY AND 1932 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA SYSTEM INTEGRITY 183 080.71224 310 INSTALL 1400 FEET OF 2 INCH POLY AND ABANDON 125 FEET OF 4 INCH STEEL, 292 FEET OF 4 INCH POLY, 211 FEET OF 3 INCH STEEL, 145 FEET OF 2 INCH STEEL, 346 FEET OF 2 INCH POLY, AND 151 FEET OF 2 INCH STEEL AND DISTRICT REGLUATOR STATION 23 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY 184 080.71255 (2,839,533) RELOCATE FACILITIES. INSTALL 1769 FEET OF 20 INCH STEEL AND ABANDON 1759 FEET OF 20 INCH STEEL ALONG IH 635 TO ACCOMODATE TXDOT IH 635 IMPROVEMENTS PROJECT.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 185 080.71294 (200) INSTALL 2500 FEET OF 2 INCH POLY AND ABANDON 2550 FEET OF 3 INCH POLY ALONG COLLEGE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY 186 080.71302 781 INSTALL 1075 FEET OF 4 INCH AND 350 FEET OF 2 INCH POLY ALONG NORTH BANKS AND WEST 5TH STREET AND ABANDON 485 FEET OF 2 INCH AND 922 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALDWELL SYSTEM INTEGRITY 187 080.71303 732 INSTALL 600 FEET OF 4 INCH AND 700 FEET OF 2 INCH POLY ALONG NORTH BANKS STREET AND ABANDON 600 FEET OF 2 INCH COATED STEEL AND 700 FEET OF 2 INCH BARE STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALDWELL SYSTEM INTEGRITY 188 080.71304 (113,418) INSTALL 13,251 FEET OF 12 INCH POLY ALONG HARMON ROAD FROM HERITAGE TRACE PARKWAY TO GOLDEN TRIANGLE ROAD IN FORT WORTH. ALL CUSTOMERS FORT WORTH SYSTEM IMPROVEMENT 189 080.71368 (1,955) INSTALL 2,225 FEET OF 2 INCH POLY AND ABANDON 2,233 FEET OF 2 INCH STEEL, 222 FEET OF 2 INCH POLY, 285 FEET OF 4 INCH STEEL, DISTRICT REGULATOR STATION 112 ALONG JACQUELINE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 190 080.71369 (490) INSTALL 2350 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY ALONG ROBERTS STREET AND ABANDON 1919 FEET OF 4 INCH AND 627 FEET OF 3 INCH STEEL AND VERNON DISTRICT REGLUATOR STATION 18 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS VERNON SYSTEM INTEGRITY 191 080.71387 (26,327) INSTALL 2,750 FEET OF 2 INCH POLY AND ABANDON 2,750 FEET OF 4 INCH STEEL ALONG THE STREETS OF TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY 192 080.71412 30,622 INSTALL 5150 FEET OF 4 INCH POLY AND 1709 FEET OF 2 INCH POLY AND ABANDON 944 FEET OF 6 INCH POLY, 3646 FEET OF 3 INCH POLY, AND 1919 FEET OF 2 INCH POLY ALONG THUNDERBIRD LANE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS PLANO SYSTEM INTEGRITY 193 080.71429 (9,609) RELOCATE FACILIITES. INSTALL 1,078 FEET OF 6 INCH POLY AND 283 FEET OF 10 INCH STEEL AND ABANDON 120 FEET OF 6 INCH, 958 FEET OF 4 INCH POLY AND 110 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WYLIE SYSTEM INTEGRITY 194 080.71467 (54,125) INSTALL DISTRICT REGULATOR STATION #237 AND 1,500 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION #237, 1,500 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 195 080.71517 67 RELOCATE FACILITIES. INSTALL 3,750 FEET OF 4 INCH AND 350 FEET OF 2 INCH POLY ALONG HARD ROCK ROAD AND PIONEER DRIVE AND ABANDON 20 FEET OF 6 INCH POLY, 617 FEET OF 4 INCH STEEL, 1,948 FEET OF 4 INCH POLY, 951 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES MTX Retirements Page 5 of 45 505 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 196 080.71522 (50,213) INSTALL DISTRICT REGULATOR STATION 407 AND ABANDON DISTRCT REGULATOR STATION #407 ALONG THE STREETS OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 197 080.71528 (188) INSTALL DISTRICT REGULATOR STATION 426 IN FORT WORTH AND ABANDON DISTRICT REGULATOR STATION 426 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 198 080.71531 (4,647) INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION 503 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 199 080.71532 (75,197) ABANDON DISTRICT REGULATOR STATION 529 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 200 080.71534 (2,461) RELOCATE FACILITIES. INSTALL 1950 FEET OF 4 INCH AND 1715 FEET OF 2 INCH POLY ALONG SOUTH BROAD STREETAND ABANDON 2640 FEET OF 3 INCH STEEL 1075 FEET OF 3 INCH AND 260 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CEDAR HILL STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL RELOCATION OF FACILITIES 201 080.71567 (6,301) RELOCATE FACILITIES. INSTALL 500 FEET OF 4 INCH POLY AND ABANDON 4 INCH STEEL ALONG DOVE STREET ALL CUSTOMERS SOUTHLAKE RELOCATION OF FACILITIES 202 080.71592 6,512 RELOCATE FACILITIES. INSTALL 1600 FEET OF 2 INCH AND 125 FEET OF 4 INCH POLY AND ABANDON 200 FEET OF 2 INCH STEEL AND 180 FEET OF 4 INCH STEEL AND 40 FEET OF 3 INCH STEEL ALONG BETSY DRIVE AND KARNES DRIVE TO ACCOMMODATE THE CITY OF ROBINSON DRAINAGE PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ROBINSON RELOCATION OF FACILITIES 203 080.71607 3,099 INSTALL 785 FEET OF 6 INCH POLY, 1430 FEET OF 4 INCH POLY AND 25 FEET OF 2 INCH POLY ALONG S. BROADWAY AND ABANDON 940 FEET OF 2 INCH STEEL AND 855 FEET OF 2 INCH POLY 300 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY 204 080.71647 562 INSTALL 1600 FEET OF 2 INCH POLY ALONG THE ALLEY BETWEEN SPEEDWAY AND VICTORY AND ABANDON 1306 FEET OF 4 INCH STEEL, 22 FEET OF 3 INCH STEEL, 414 FEET OF 4 INCH POLY AND 7 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 205 080.71648 1,854 INSTALL 1200 FEET OF 2 INCH POLY IN THE ALLEY BETWEEN SPEEDWAY AVENUE AND ABANDON 1200 FEET OF 4 INCH STEEL AND 33 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 206 080.71703 (3,724) RELOCATE FACILITIES.&NBSP; INSTALL 1600 FEET OF 4 INCH AND 345 FEET OF 2 INCH POLY ALONG PALASOTA DRIVE AND ABANDON 1200 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY 207 080.71710 5,539 RELOCATE FACILITIES. INSTALL 1977 FEET OF 2 INCH POLY ALONG GRIFFIN STREET AND PINE STREET AND ABANDON 1473 FEET OF 2 INCH POLY AND 591 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF MCKINNEY IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY 208 080.71716 (36,144) INSTALL 4,350 FEET OF 2 INCH, 1,200 FEET OF 4 INCH, 620 FEET OF 6 INCH, AND 400 FEET OF 4 INCH POLY ALONG THE STREET OF HALBERT STREET AND ABANDON DISTRICT REGULATOR STATION# 429, 2,950 FEET OF 4 INCH 1,615 FEET OF 3 INCH STEEL, 315 FEET OF 4 INCH, 60 FEET OF 2 INCH AND 1,100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 209 080.71738 1,094 INSTALL 3615 FEET OF 4 INCH AND 550 FEET OF 2 INCH POLY ALONG EDGEWOOD TERRACE AND ABANDON 3300 FEET OF 4 INCH POLY AND 1060 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 210 080.71760 (51,798) RELOCATE FACILITIES. INSTALL 2603 FEET OF 8 INCH, 2891 FEET OF 4 INCH AND 720 FEET OF 2 INCH POLY AND ABANDON 747 FEET OF 8 INCH, 1689 FEET OF 6 INCH, 985 FEET OF 4 INCH, 1404 FEET OF 3 INCH, 107 FEET OF 2 INCH STEEL, 10 FEET OF 4 INCH POLY AND 439 FEET OF 3 INCH POLY ALONG HARBIN STREET TO ACCOMMODATE THE CITY OF STEPHENVILLE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY 211 080.71773 (37,802) INSTALL 2,140 FEET OF 2 INCH, 1,600 FEET OF 4 INCH, AND 800 FEET OF 6 INCH POLY ALONG THE STREETS OF 13TH AND 15TH AND ABANDON 1,300 FEET OF 2 INCH, 1,250 FEET OF 4 INCH, 100 FEET OF 3 INCH POLY AND 340 FEET OF 2 INCH, 800 FEET OF 6 INCH, 550 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY 212 080.71805 (7,733) INSTALL 1,480 FEET OF 4 INCH AND 1,020 FEET OF 2 INCH POLY ALONG THE STREETS OF CHAMBERLAND AVENUE AND ABANDON 400 FEET OF 4 INCH, AND 1,300 FEET OF 2 INCH STEEL AND 800 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EMHOUSE SYSTEM INTEGRITY 213 080.71832 (83,916) RELOCATE FACILITIES. INSTALL 4,100 FEET OF 8 INCH POLY ALONG HIGHWAY 287 AND ABANDON 3.060 FEET OF 6 INCH POLY, AND 370 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY 214 080.71838 20 RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY ALONG CARROLL DRIVE AND ABANDON 495 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES 215 080.71839 (401,732) INSTALL 83,000 FEET (16 MILES) OF 6 INCH, 100 FEET OF 4 INCH, 3,000 FEET OF 2 INCH POLY AND 8 DISTRICT REGULATOR STATIONS ALONG LINE E16 IN PARIS AND ABANDON 44,455 FEET OF 8 INCH, 42,425 FEET OF 4 INCH, 300 FEET OF 6 INCH, 175 FEET OF 3 INCH STEEL AND 325 FEET OF 8 INCH POLY AND 8 MAIN LINE REGULATOR STATIONS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY 216 080.71850 (27) REPLACE 5.7 MILES OF 3 INCH STEEL WITH 4 INCH STEEL ALONG LINE L8AE1 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BUFFALO SYSTEM INTEGRITY 217 080.71856 (3,603) INSTALL 3200 FEET OF 6 INCH, 100 FEET OF 2 INCH POLY AND 3.2 MILES OF 12 INCH STEEL ALONG LINE 028 AND ABANDON 3.2 MILES OF 3.5 INCH STEEL AND MAIN LINE REGULATOR 42 AND 15 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ROWLETT SYSTEM INTEGRITY 218 080.71884 (3,919) INSTALL DISTRICT REGULATOR STATION #03 ALONG THE STREETS OF GRANBURY AND ABANDON DISTRICT REGULATOR STATION #03 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY 219 080.71892 (974,020) INSTALL 1,769 FEET OF 20 INCH STEEL AND ABANDON 1,449 FEET OF 20 INCH STEEL ALONG LBJ AND MCCREE ROAD TO ACCOMODATE THE TXDOT-DRIVEN IH635 IMPROVEMENTS PROJECT IN GARLAND, DALLAS COUNTY. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES 220 080.71894 (46,358) INSTALL DISTRICT REGULATOR STATION, 2,057 FEET OF 2 INCH, 1,708 FEET OF 4 INCH, 194 FEET OF 6 INCH POLY AND 81 FEET OF 10 INCH, 254 FEET OF 8 INCH, AND 51 FEET OF 4 INCH STEEL CASING ALONG THE STREET NORTH ALLEY AND NASH AND ABANDON 2,936 FEET OF 6 INCH, 300 FEET OF 4 INCH, 126 FEET OF 3 INCH, AND 103 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY 221 080.71907 (81,744) INSTALL 300 FEET OF 6 INCH POLY ALONG WEST PIPELINE AND CHATEAU VALEE IN EULESS AND ABANDON 261 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY 222 080.71909 (142,060) INSTALL 530 FEET OF 6 INCH AND 10 FEET OF 2 INCH POLY ALONG WEST PIPELINE AND COLUMBUS IN BEDFORD AND ABANDON 516 FEET OF 6 INCH STEEL AND 10 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEDFORD SYSTEM INTEGRITY 223 080.71910 (85,782) INSTALL 325 FEET OF 6 INCH, 10 FEET OF 4 INCH POLY ALONG WEST PIPELINE AND GETTYSBURG IN BEDFORD AND ABANDON 284 FEET OF 6 INCH AND 10 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEDFORD SYSTEM INTEGRITY 224 080.71921 (1,165) RELOCATE FACILITIES. INSTALL 1230 FEET OF 2 INCH POLY AND 2015 FEET OF 4 INCH POLY AND ABANDON 2747 FEET OF 2 INCH STEEL ALONG STARK STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES 225 080.71948 (21,531) INSTALL 4500 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 323, 2000 FEET OF 4 INCH STEEL AND 2500 FEET OF 4 INCH POLY ALONG EAST BEKNAP STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 226 080.71951 (31) INSTALL 8585 FEET OF 4 INCH STEEL AND ABANDON 8585 FEET OF 4 INCH STEEL ALONG THE STREETS OF GAINESVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209.ALL CUSTOMERS MYRA SYSTEM INTEGRITY 227 080.71954 (593) INSTALL 20 FEET OF 6 INCH POLY ALONG LAKESIDE PARKWAY. ALL CUSTOMERS COPPELL SYSTEM IMPROVEMENT MTX Retirements Page 6 of 45 506 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 228 080.71956 (14,517) RELOCATE FACILITIES. INSTALL 156 FEET OF 2 INCH AND 1,616 FEET OF 4 INCH POLY ALONG COLORADO STREET AND ABANDON 558 FEET OF 2 INCH AND 250 FEET OF 4 INCH POLY AND 416 FEET OF 3 INCH STEEL IN COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA SYSTEM INTEGRITY 229 080.71960 (53) INSTALL 3025 FEET OF 2 INCH POLY ALONG EAST HARRISON STREET AND SHERMAN STREET AND ABANDON 100 FEET OF 1.5 INCH STEEL, 747 FEET OF 3 INCH STEEL, 1477 FEET OF 4 INCH STEEL, 37 FEET OF 3 INCH POLY, 100 FEET OF 4 INCH LP POLY AND DISTRICT REGULATOR STATION 02 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS MELISSA SYSTEM INTEGRITY 230 080.71962 2,529 INSTALL 450 FEET OF 2 INCH POLY AND 2160 FEET OF 4 INCH POLY ALONG NORTH CENTRAL STREET AND ABANDON 1999 FEET OF 3 INCH STEEL, 275 FEET OF 3 INCH POLY AND DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS MELISSA SYSTEM INTEGRITY 231 080.71969 (16,573) RELOCATE FACILITIES. INSTALL TWO 6 INCH ISOLATION VALVE, 10 INCH MAINLINE VALAVE, 80 FEET OF 16 INCH STEEL AND ABANDON 80 FEET OF 16 INCH STEEL ALONG THE STREETS OF ARLINGTON. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES 232 080.71975 31 INSTALL 400 FEET OF 2 INCH STEEL AND ABANOND 400 FEET OF 2 INCH STEEL ALONG LINE U9-1 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS MUNDAY SYSTEM INTEGRITY 233 080.71982 (13,437) INSTALL 1,407 FEET OF 8 INCH AND 10 FEET OF 2 INCH POLY ALONG MT. ZION ROAD AND ABANDON 1,330 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY 234 080.71993 (384) INSTALL 26,498 FEET OF 4 INCH STEEL AND ABANDON 26,498 FEET OF 3 INCH STEEL ALONG JOE REEVES ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209.ALL CUSTOMERS TRENTON SYSTEM INTEGRITY 235 080.71999 (95,990) INSTALL 3,650 FEET OF 4 INCH, 7,750 FEET OF 2 INCH POLY ALONG DAVIS STREET IN CLEBURNE AND ABANDON 8,085 FEET OF 4 INCH, 1,540 FEET OF 2 INCH STEEL AND 520 FEET OF 4 INCH, 825 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY 236 080.72011 646 RELOCATE FACILITIES. INSTALL 2100 FEET OF 2 INCH POLY AND ABANDON 1285 FEET OF 2 INCH STEEL ALONG REDBUD TO ACCODATE THE CITY OF GARLAND IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES 237 080.72012 (309) RELOCATE FACILITIES. INSTALL 45 FEET OF 2 INCH POLY AND 85 FEET OF 6 INCH POLY ALONG GARAPAN DRIVE AND ABANDON 45 FEET OF 2 INCH POLY AND 85 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 238 080.72035 (1,183) INSTALL 1000 FEET OF 2 INCH POLY AND ABANDON 950 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 15 ALONG WATERS COURT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY 239 080.72036 (3,035) INSTALL 750 FEET OF 2 INCH POLY AND 3100 FEET OF 4 INCH POLY AND ABANDON 530 FEET OF 4 INCH POLY, 4765 FEET OF 4 INCH STEEL, 475 FEET OF 6 INCH POLY, 2620 FEET OF 6 INCH STEEL, 40 FEET OF 6 INCH CAST IRON AND 170 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 240 080.72039 (8,691) RELOCATE FACILITIES. INSTALL 5350 FEET OF 8 INCH, 425 FEET OF 4 INCH, AND 255 FEET OF 2 INCH POLY AND ABANDON 4115 FEET OF 4 INCH STEEL, 1555 FEET OF 4 INCH, 60 FEET OF 3 INCH, AND 50 FEET OF 2 INCH POLY ALONG CEDAR HILL SOUTH CLARK TRAIL TO ACCOMMODATE THE CITY OF DESOTO IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS CEDAR HILL RELOCATION OF FACILITIES 241 080.72045 (708) INSTALL 300 FEET OF 12 INCH STEEL ALONG UNION STREET AND ABANDON 300 FEET OF 12 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY 242 080.72075 (104,142) RELOCATE FACILITIES. INSTALL 510 FEET OF 4 INCH POLY AND RETIRE 500 FEET OF 4 INCH STEEL AND 115 FEET 2 INCH STEEL ALONG CENTRAL TEXAS PARKWAY TO ACCOMMODATE CITY OF WACO STREET PROOJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 243 080.72082 (1,259) RELOCATE FACILITIES. INSTALL 250 FEET OF 2 INCH POLY AND ABANDON 150 FEET OF 2 INCH POLY ALONG PRIVATE DRIVE IN NORTH RICHLAND HILLS, TX. ALL CUSTOMERS NORTH RICHLAND HILLS RELOCATION OF FACILITIES 244 080.72085 (112,236) RELOCATE FACILITIES. INSTALL 922 FEET OF 6 INCH POLY, 3601 FEET OF 4 INCH POLY AND 597 FEET OF 2 INCH POLY AND ABANDON 2070 FEET OF 6 INCH STEEL, 2390 FEET OF 4 INCH STEEL AND 449 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF IRVING STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY 245 080.72099 (8,948) RELOCATE FACILIITES.&NBSP; INSTALL 85 FEET OF 6 INCH POLY ALONG BELTLINE AND ABANDON 55 FEET OF 6 INCH POLY IN ACCORDDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DESOTO SYSTEM INTEGRITY 246 080.72122 3,325 INSTALL 2694 FEET OF 2 INCH POLY AND 4379 FEET OF 4 INCH POLY ALONG STREETS OF ITALY AND ABANDON 2469 FEET OF 2 INCH STEEL, 4046 FEET OF 3 INCH STEEL, 150 FEET OF 3 INCH POLY, 585 FEET OF 4 INCH STEEL, 815 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION 03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ITALY SYSTEM INTEGRITY 247 080.72199 1,524 INSTALL 3500 FEET OF 2 INCH POLY ALONG TATE STREET AND ABANDON 1850 FEET OF 4 INCH STEEL AND 460 FEET OF 4 INCH, 420 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY 248 080.72203 608 RELOCATE FACILITIES. INSTALL 2119 FEET OF 6 INCH POLY, 120 FEET OF 4 INCH POLY AND 171 FEET OF 2 INCH POLY ALONG PIPELINE ROAD AND ABANDON 1760 FEET OF 6 INCH POLY, 164 FEET OF 4 INCH POLY AND 176 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF HURST STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HURST RELOCATION OF FACILITIES 249 080.72211 (295,546) PREPARE KILLEEN SERVICE CENTER FOR RETIREMENT. ALL CUSTOMERS SYSTEM WIDE STRUCTURES 250 080.72217 (32) RELOCATE FACILITIES. ABANDON 475 FEET OF 4 INCH STEEL ALONG STATE HIGHWAY 199 TO ACCOMMODATE TXDOT STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH SYSTEM INTEGRITY 251 080.72223 (9,614) RELOCATE FACIILITIES. INSTALL 1,300 FEET OF 6 INCH AND 200 FEET OF 2 INCH POLY ALONG SPRING VALLEY ROAD AND LINGCO DRIVE IN RICHARDSON AND ABANDON 1,300 FEET OF 6 INCH STEEL AND 200 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY 252 080.72239 208 ABANDON 226 FEET OF 3 INCH POLY, 290 FEET OF 0.75" INCH POLY ALONG 1900 EAST PARMER LANE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AUSTIN SYSTEM INTEGRITY 253 080.72266 (79,234) INSTALL 42,100 FEET OF 4 INCH STEEL AND ABANDON 42,070 FEET OF 6 INCH STEEL ALONG LINE O29 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SCURRY SYSTEM INTEGRITY 254 080.72270 (20,542) INSTALL 3,100 FEET OF 2 INCH POLY ALONG SPRINGWOOD LANE AND SPRINGPARK WAY IN PLANO AND ABANDON 3,100 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY 255 080.72275 2,708 RELOCATE FACILITIES. INSTALL 860 FEET OF 4 INCH POLY, 20 FEET OF 2 INCH POLY AND ABANDON 800 FEET OF 4 INCH STEEL, 60 FEET OF 4 INCH POLY, 20 FEET OF 2 INCH POLY ALONG CULVER AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES 256 080.72278 (1,138) INSTALL 2000 FEET OF 2 INCH AND 550 FEET OF 4 INCH POLY ALONG LINE C10-5 AND ABANDON 3 MILES OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS NORTH RICHLAND HILLS SYSTEM INTEGRITY 257 080.72292 4,580 INSTALL 3635 FEET OF 2 INCH POLY AND ABANDON 14 FEET OF 1.25 INCH POLY, 1899 FEET OF 2 INCH POLY, 13 FEET OF 1.25 INCH STEEL, 1511 FEET OF 2 INCH STEEL AND ABANDON DRS04 ALONG STREETS OF LIPAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LIPAN SYSTEM INTEGRITY 258 080.72294 6,482 INSTALL 425 FEET OF 6 INCH POLY AND 465 FEET OF 2 INCH POLY AND ABANDON 425 FEET OF 6 INCH POLY AND 465 FEET OF 2 INCH POLY ALONG WILLIMAS DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY 259 080.72300 8,501 INSTALL 2,550 FEET OF 6 INCH POLY ALONG FM 691. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS DENISON GROWTH 260 080.72308 539 INSTALL 1150 FEET OF 2 INCH POLY ALONG DAWN DRIVE AND ABANDON 1150 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY 261 080.72310 (237) REPLACE DISTRICT REGULATOR STATION #02 IN VENUS AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VENUS SYSTEM INTEGRITY MTX Retirements Page 7 of 45 507 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 262 080.72321 385 INSTALL 1525 FEET OF 2 INCH POLY ALONG STREETS OF RANGER AND ABANDON 173 FEET OF 1.25 INCH STEEL, 67 FEET OF 2 INCH STEEL, 14 FEET OF 3 INCH STEEL, 29 FEET OF 4 INCH STEEL, 65 FEET OF 2 INCH POLY AND 68 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER SYSTEM INTEGRITY 263 080.72322 672 INSTALL 1650 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION AND ABANDON 1221 FEET OF 2 INCH STEEL AND 468 FEET OF 3 INCH STEEL AND DISTRICT REGULATOR STATION 11 ALONG STREETS OF RANGER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER SYSTEM INTEGRITY 264 080.72324 (353,997) INSTALL 1,445 FEET OF 6 INCH AND 2,132 FEET OF 8 INCH POLY ALONG THE STREETS OF JIM CHRISTAL TOAD AND N WESTERN BOULEVARD IN DENTON, DENTON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY 265 080.72347 (39,049) RELOCATE FACILITIES.&NBSP; INSTALL 925 FEET OF 2 INCH AND 300 FEET OF 8 INCH POLY ALONG ECHO BLUFF AND ABANDON 925 FEET OF 2 INCH POLY AND 330 FEET OF 8 INCH STEEL TO ACCOMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 266 080.72348 (183) INSTALL 80 FEET OF 2 INCH POLY AND 100 FEET OF 2 INCH POLY ALONG COUNTY ROAD 825 AND ABANDON 25 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYLVESTER SYSTEM INTEGRITY 267 080.72367 (1,081) RELOCATE FACILITIES. INSTALL 1948 FEET OF 6 INCH POLY, 75 FEET OF 4 INCH POLY AND 344 FEET OF 2 INCH POLY AND ABANDON 1527 FEET OF 6 INCH POLY AND 387 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF COLLEYVILLE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE RELOCATION OF FACILITIES 268 080.72369 585 RELOCATE FACILITIES. INSTALL 950 FEET OF 4 INCH AND 330 FEET OF 2 INCH POLY ALONG N COLLEGE STREET AND ABANDON 300 FEET OF 4 INCH, 773 FEET OF 2 INCH STEEL, 87 FEET OF 4 INCH, 107 FEET OF 2 INCH, AND 445 FEET OF 1.25 INCH POLY TO ACCOMMODATE THE CITY OF WAXAHACHIE DRAINAGE PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE RELOCATION OF FACILITIES 269 080.72372 (26,669) INSTALL 3,370 FEET OF 2 INCH POLY ALONG MONTICELLO ROAD IN WAXAHACHIE AND ABANDON 2,301 FEET OF 2 INCHSTEEL AND 159 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY 270 080.72389 4,926 INSTALL 1100 FEET OF 2 INCH POLY AND ABANDON 816 FEET OF 4 INCH POLY, 306 FEET OF 4 INCH, AND 378 FEET OF 4 INCH STEEL ALONG BIRCH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 271 080.72390 (15,088) INSTALL 1,000 OF 2 INCH POLY ALONG BEECH STREET AND ABANDON 606 FEET OF 2 INCH AND 879 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 272 080.72391 (14,230) INSTALL 2,300 FEET OF 2 INCH POLY ALONG SEYMOUR AND CHERRY IN WICHITA FALLS AND ABANDON 663 FEET OF 2 INCH, 341 FEET OF 4 INCH, 463 FEET OF 1.25 INCH STEEL AND 344 FEET OF 4 INCH, 506 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 273 080.72392 (826) INSTALL 1,375 FEET OF 2 INCH POLY AND ABANDON 572 FEET OF 2 INCH, 805 FEET OF 4 INCH STEEL AND 26 FEET OF 4 INCH POLY ALONG AVE J AND ARTHUR IN WICHITA FALLS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 274 080.72413 (10,507) INSTALL 5,750 FEET OF 4 INCH STEEL, MAIN LINE REGULATOR STATION AND ABANDON 5,750 FEET OF 2 INCH STEEL, MAIN LINE REGULATOR STATION ALONG US HWY 77 IN ELLIS COUNTY. IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORRESTON SYSTEM INTEGRITY 275 080.72420 (4,306) INSTALL 2257 FEET OF 2 INCH POLY, 840 FEET OF 4 INCH POLY AND ABANDON 3171 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 276 080.72437 255 INSTALL 2065 FEET OF 2 INCH POLY ALONG COUNTY ROAD 816 AND ABANDON 2410 FEET 2 INCH STEEL AND DISTRICT REGLUATOR STATION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYLVESTER SYSTEM INTEGRITY 277 080.72438 (32,686) INSTALL 1225 FEET OF 2 INCH AND 1500 FEET OF 4 INCH POLY ALONG THE STREETS OF WACO AND ABANDON 1225 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 278 080.72439 (28,917) INSTALL 1,135 FEET OF 2 INCH AND 1,430 FEET OF 4 INCH POLY ALONG GORMAN AND MORROW STREETS AND ABANDON 2,401 FEET OF 4 INCH STEEL, 336 FEET OF 4 INCH AND 716 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE OF 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY 279 080.72448 (367) INSTALL 2155 FEET OF 4 INCH POLY AND 645 FEET OF 2 INCH POLY AND ABANDON 2155 FEET OF 4 INCH STEEL AND 645 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 280 080.72449 9,649 INSTALL 2150 FEET OF 4 INCH POLY AND 360 FEET OF 2 INCH POLY AND ABANDON 2050 FEET OF 4 INCH STEEL AND 330 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 281 080.72450 (124) INSTALL 2600 FEET OF 4 INCH POLY AND ABANDON 2402 OF 3 INCH STEEL ALONG GUTHRIE DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY 282 080.72452 (4,695) RELOCATE FACILITIES. INSTALL 700 FEET OF 2INCH POLY AND ABANDON 950 FEET OF STEEL ALONG CHERYL ST IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 283 080.72461 490 RELOCATE FACILITIES. INSTALL 900 FEET OF 4 INCH POLY AND ABANDON 900 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 284 080.72473 (12,299) INSTALL DISTRICT REGULATOR STATION ALONG HALL JOHNSON ROAD AND ABANDON DISTRICT REGULATOR STATION #05 AND #08. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY 285 080.72490 1,515 INSTALL 950 FEET OF 2 INCH POLY ALONG SOUTH MAIN STREET AND ABANDON 678 FEET OF 2 INCH STEEL AND 482 FEET OF 2 INCH POLY AND DISTRICT REGLUATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENT SYSTEM INTEGRITY 286 080.72497 676 INSTALL 642 FEET OF 4 INCH POLY ALONG CLARK STREET AND ABANDON 988 FEET OF 4 INCH STEEL, AND 10 FEET OF 2 INCH STEEL ALONG CLARK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BARTLETT SYSTEM INTEGRITY 287 080.72500 (133,594) INSTALL 3.200 FEET OF 12 INCH POLY AND ABANDON 3.200 FEET OF 6 INCH POLY ALONG W. EVERMAN PKWY.ALL CUSTOMERS FORT WORTH SYSTEM IMPROVEMENT 288 080.72505 6,209 RELOCATE FACILITIES. INSTALL 980 FEET OF 4 INCH POLY AND ABANDON 980 FEET OF 3 INCH STEELTO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 289 080.72508 (190) ABANDON 6630 FEET OF 4 INCH STEEL ALONG HUTTO ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY 290 080.72512 250 INSTALL 300 FEET OF 4 INCH, 2300 FEET OF 2 INCH POLY ALONG WICKER AVE ALLEYWAY AND ABANDON 300 FEET OF 3 INCH STEEL, 2300 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY 291 080.72524 (1,389) INSTALL 2600 FEET OF 2 INCH POLY ALONG SOUDER DRIVE AND ABANDON 1377 FEET OF 2 INCH STEEL, 469 FEET OF 4 INCH STEEL AND 706 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.029. ALL CUSTOMERS HURST SYSTEM INTEGRITY 292 080.72525 (18,447) RELOCATE FACILITIES.&NBSP;&NBSP; ISNTALL 2,600 FEET ON 2INCH POLY AND ABANDON 1,519 FEET OF 2INCH STEEL ALONG HURSTVIEW DRIVE AND 1.058 FEET OF 2 INCH POLY; IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY 293 080.72526 (33,639) RELOCATE FACILITIES.; INSTALL 1,200 FEET OF 2 INCH AND 1,500 FEET OF 6 INCH POLY ALONG NORTH ARTHUR DRIVE AND ABANDON 1,183 FEET OF 1.25 INCH AND 1,127 FEET OF 2 INCH POLY; 7 FEET OF 1.25 INCH; AND 1,732 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY 294 080.72527 (195,776) INSTALL 2,550 FEET OF 2 INCH POLY AND ABANDON 2,215 FEET OF 3 INCH STEEL AND 955 FEET OF 4 INCH STEEL ALONG MYRTLE DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY 295 080.72528 (410,644) INSTALL 2,570 FEET OF 4 INCH POLY ALONG CULLUM AVENUE AND ABANDON 93 FEET OF 4 INCH POLY, 2,666 FEET OF 4 INCH STEEL, AND 148 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY 296 080.72529 (60,241) INSTALL 2,935 FEET OF 4 INCH POLY ALONG HENSON DRIVE AND THOMAS AVENUE AND ABANDON 45 FEET OF 4 INCH POLY AND 2,848 FEET OF 4 INCH STEEL IN ACCORDANE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY 297 080.72533 (2,657) RELOCATE FACILITIES.&NBSP; INSTALL 350 FEET OF 2 INCH POLY ALONG 10TH STREET AND ABANDON 400 FEET OF 2 INCH STEEL AND 350 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY MTX Retirements Page 8 of 45 508 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 298 080.72535 (4,997) INSTALL 1,500 FEET OF 2 INCH POLY AND ABANDON 991 FEET OF 2 INCH STEEL AND 430 FEET OF 3 INCH STEEL ALONG EAST WENONAH BOULEVARD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 299 080.72536 (17,688) RELOCATE FACILITIES. INSTALL 2,000 FEET OF 2 INCH POLY ALONG WEST WENONAH BOULEVARD AND ABANDON 1,522 FEET OF 2 INCH STEEL AND 433 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 300 080.72545 (1) RELOCATE FACILITIES. INSTALL 804 FEET OF 4 INCH POLY ALONG FM 2181 AND ABANDON 285 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES 301 080.72550 (576) RELOCATE FACILITIES. INSTALL 172 FEET OF 4 INCH POLY AND ABANDON 172 FEET OF 4 INCH POLY ALONG FORD LANE TO ACCOMMODATE AAON. ALL CUSTOMERS LONGVIEW RELOCATION OF FACILITIES 302 080.72559 (2,277) INSTALL 20 FEET OF 6 INCH, 493 FEET OF 4 INCH AND 339 FEET OF 2 INCH POLY ALONG LEGACY DRIVE SOUTH AND ABANDON 20 FEET OF 6 INCH, 200 FEET OF 4 INCH, 163 FEET OF 3 INCH AND 217 OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FRISCO SYSTEM INTEGRITY 303 080.72607 334 INSTALL 745 FEET OF 6 INCH AND 10 FEET OF 2 INCH POLY ALONG HAILEY STREET AND ABANDON 745 FEET OF 6 INCH AND 10 FEET OF 2 INCH BARE STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY 304 080.72617 (36,028) INSTALL 2,400 FEET OF 2 INCH, 670 FEET OF 6 INCH POLY ALONG THE STREETS OF ABILENE AND ABANDON 660 FEET OF 3 INCH STEEL AND 331 FEET OF 2 INCH POLY AND 1,765 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 305 080.72618 18 REPLACE DRS05 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GROESBECK SYSTEM INTEGRITY 306 080.72623 (449) INSTALL 1354 FEET OF 4 INCH, 744 FEET OF 2 INCH POLY AND ABANDON 961 FEET OF 1.25 INCH STEEL, 177 FEET OF 2 INCH STEEL, 34 FEET OF 2 INCH POLY AND 569 FEET OF 3 INCH POLY MAINS ALONG 845 TIVY STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY 307 080.72649 (7,635) INSTALL 200 FEET OF 2 INCH, 1,470 FEET OF 4 INCH, 1,000 FEET OF 6 INCH POLY AND ABANDON 216 FEET OF 2 INCH, 1,642 FEET OF 3 INCH, 229 FEET OF 4 INCH STEEL AND 26 FEET OF 2 INCH, 263 FEET OF 3 INCH AND 334 FEET OF 4 INCH POLY ALONG THE STREETS OF ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 308 080.72651 (4,123) INSTALL 1,320 FEET OF 4 INCH, 1,450 FEET OF 6 INCH POLY AND ABANDON 632 FEET OF 2 INCH, 1,590 FEET OF 3 INCH STEEL AND 412 FEET OF 3 INCH POLY ALONG THE STREETS OF ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 309 080.72653 (2,068) INSTALL 83 FEET OF 6 INCH AND 396 FEET OF 4 INCH POLY AND ABANDON 45 FEET OF 3 INCH STEEL AND 434 FEET INCH OF 2 INCH POLY ALONG MCCLENDON ROAD. ALL CUSTOMERS HEATH SYSTEM IMPROVEMENT 310 080.72656 (7,749) INSTALL 2,650 FEET OF 8 INCH POLY ALONG BOIS D ARC AND ABANDON 2,650 FEET OF 3 INCH STEEL.ALL CUSTOMERS HEATH SYSTEM IMPROVEMENT 311 080.72658 (27,325) INSTALL 258 FEET OF 6 INCH POLY ALONG FM2181 NEAR WILDWOOD LANE AND MIRANDA PLACE IN DENTON AND ABANDON 240 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY 312 080.72663 (77) INSTALL 2300 FEET OF 4 INCH POLY ALONG SMIRL DRIVE. ALL CUSTOMERS ROCKWALL SYSTEM IMPROVEMENT 313 080.72678 622 RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH POLY ALONG PARKPLACE AND ABANDON 350 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES 314 080.72696 (152,459) INSTALL 4,250 FEET OF 8 INCH, 3,480 FEET OF 4 INCH AND 2,985 FEET OF 2 INCH POLY ALONG NORTH PEARSON AND ABANDON 4,300 FEET OF 2 INCH, 3,400 FEET OF 3 INCH AND 1,640 FEET OF 4 INCH STEEL AND 1,075 FEET OF 2 INCH, 1,940 FEET OF 4 INCH AND 260 FEET OF 8 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GODLEY SYSTEM INTEGRITY 315 080.72700 (408,883) RELOCATE FACILITIES.&NBSP; INSTALL REGULATOR STATION AND RETIRE OLD REGULATOR STATION ALONG FINLEY ROAD DUE TO OBSOLETE COMPONENTS AND MULTIPLE LEAKS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS IRVING SYSTEM INTEGRITY 316 080.72726 (30,527) RELOCATE FACILITIES. INSTALL 2,340 FEET OF 4 INCH POLY ALONG SOUTH CAMP WISDOM AND ABANDON 34 FEET OF 4 INCH STEEL, 445 FEET OF 2INCH AND 1,900 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 317 080.72742 (2,915) INSTALL 666 FEET OF 4 INCH POLY ALONG EAST AUSTIN AVENUE AND NORTH LAMPASAS STREET AND ABANDON 355 FEET OF 2 INCH POLY AND 298 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY 318 080.72743 2,945 INSTALL 465 FEET OF 2 INCH AND 1377 FEET OF 4 INCH POLY AND ABANDON 455 FEET OF 4 INCH STEEL, 60 FEET OF 4 INCH POLY, 1127 FEET OF 3INCH STEEL AND 200 FEET OF 2 INCH STEEL ALONG EAST WALNUT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 319 080.72751 (120,662) INSTALL 36,960 FEET OF 4 INCH STEEL ALONG FM 897 IN BOSQUE COUNTY AND ABANDON 26,960 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE OF 8.209.ALL CUSTOMERS HICO SYSTEM INTEGRITY 320 080.72759 (24,375) REPLACE 5.25 MILES OF 10 INCH STEEL ALONG LINE KC (WEST) WITH 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLYDE SYSTEM INTEGRITY 321 080.72760 (33,992) INSTALL 2,320 FEET OF 4 INCH AND 465 FEET OF 2 INCH POLY ALONG COLLEGE STREET AND ABANDON 287 FEET OF 3 INCH, 817 FEET OF 4 INCH POLY AND 1,236 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY 322 080.72762 (19,920) INSTALL 2760 FEET OF 2 INCH POLY ALONG DREXEL DRIVE AND ABANDON 134 FEET OF 3 INCH POLY, 31 FEET OF 4 INCH POLY, 664 FEET OF 3 INCH STEEL, 1,483 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION 07 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY 323 080.72763 (46,196) INSTALL 2,610 FEET OF 4 INCH AND 525 FEET OF 2 INCH POLY ALONG BALL STREET AND ABANDON 1,941 FEET OF 4 INCH POLY AND 964 FEET OF 2, 4, AND 6 INCH STEEL AND GRAPEVINE DISTRICT REGULATOR STATION #7 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY 324 080.72764 (194,361) RELOCATE FACILITIES. INSTALL 2,000 FEET OF 12 INCH. 2,500 FEET OF 10 INCH, 1,500 FEET OF 4 INCH STEEL AND 1,000 FEET OF 6 INCH POLY AND NEW HIP TO DISTRICT REGULATOR STATION ALONG HIGHWAY 6 TO WACO DRIVE AND ABANDON 1,300 FEET OF 12 INCH, 200 FEET OF 10 INCH, 2,200 FEET OF 8 INCH, 1,200 FEET OF 4 INCH, 100 FEET OF 2 INCH STEEL TO ACCOMODATE TXDOT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY 325 080.72765 10 INSTALL 1165 FEET OF 4 INCH POLY ALONG EAST JORDAN ROAD AND ABANDON DRS01, 427 FEET OF 2 INCH STEEL, 986 FEET OF 3 INCH STEEL, 10 FEET OF 2 INCH POLY AND 16 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS JOSEPHINE SYSTEM INTEGRITY 326 080.72767 (75,996) INSTALL 1230 FEET OF 4 INCH POLY ALONG CADDO STREET AND ABANDON DRS 02 AND 1172 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS JOSEPHINE SYSTEM INTEGRITY 327 080.72780 (18,830) INSTALL 3200 FEET OF 4 INCH POLY AND ABANDON 630 FEET OF 4 INCH AND 620 FEET OF 3 INCH BARE STEEL AND 1900 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION 02 IN GODLEY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GODLEY SYSTEM INTEGRITY 328 080.72785 (2,456) RELOCATE FACILITIES. INSTALL 1050 FEET OF 2 INCH, 460 FEET OF 4 INCH AND 410 FEET OF 2 INCH POLY ALONG HOUSTON STREET AND RETIRE 400 FEET OF 6 INCH AND 440 FEET OF 4 INCH BARE STEEL AND 336 FEET OF 2 INCH AND 127 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON RELOCATION OF FACILITIES 329 080.72789 (783) RELOCATE FACILITIES. INSTALL 35 FEET OF 2 INCH POLY ALONG PEARL AND ABANDON 30 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 330 080.72819 (2,553) RELOCATE FACILITIES. INSTALL 900 FEET OF 4 INCH POLY ALONG IMMANUEL ROAD AND ABANDON 830 FEET OF 4 INCH POLY TO ACCOMMODATE CITY STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PFLUGERVILLE SYSTEM INTEGRITY MTX Retirements Page 9 of 45 509 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 331 080.72825 956 INSTALL 930 FEET OF 4 INCH POLY AND 1291 FEET OF 2 INCH POLY AND ABANDON 2000 FEET OF 3 IN STEEL AND 230 FEET OF 2 IN POLY ALONG BARNETT STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY 332 080.72837 398 INSTALL 1750 FEET OF 2 INCH POLY ALONG RICKETTS STREET AND ABANDON 1086 FEET OF 2 INCH POLY, 34 FEET OF 2 INCH STEEL, 220 FEET OF 4 INCH STEEL, 200 FEET OF 2 INCH STEEL AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY 333 080.72840 (52,404) INSTALL 6,945 FEET OF 2 INCH POLY ALONG MISTLETOE DRIVE AND ABANDN 2,035 FEET OF 4 INCH AND 1,285 FEET OF 2 INCH STEEL AND 240 FEET OF 4 INCH AND 5,945 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 334 080.72841 (159) INSTALL 6055 FEET 0F 4 INCH AND 1595 FEET OF 2 INCH POLY ALONG THE STREETS OF ELIZABETH CREEK SUBDIVISION. RESIDENTIAL FORT WORTH GROWTH 335 080.72855 (2,340) RELOCATE FACILITIES. INSTALL 380 FEET OF 6 INCH POLY ALONG SOUTH COOPER STREET AND ABANDON 380 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES 336 080.72857 (13,800) ABANDON 475 FEET OF 4 INCH, 1,850 FEET OF 3 INCH, 2,910 FEET OF 2 INCH POLY ALONG WILLOW SPRINGS ROAD AT PARKER HENDERSON ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 337 080.72869 (4,612) INSTALL 2800 FEET OF 2 INCH POLY ALONG GLOVER STREET, MULBERRY STREET, NORTH DAVIS STREET AND ABANDON DISTRICT REGULATOR STATION #11 ALONG CHURCH STREET AND GLOVER STREET, 905 FEET OF 4 INCH POLY, 545 FEET OF 4 INCH STEEL, 265 FEET OF 3 INCH POLY, 850 FEET OF 2 INCH STEEL AND 75 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY 338 080.72891 (26) INSTALL 4 INCH DISTRICT REGULATOR STATION AND 200 FEET OF 8 INCH POLY AND ABANDON 2 INCH DISTRICT REGULATOR STATION AND 200 FEET OF 6 INCH POLY. ALL CUSTOMERS ROWLETT SYSTEM IMPROVEMENT 339 080.72906 (43,831) RELOCATE FACILITIES. INSTALL 2,540 FEET OF 2 INCH AND 960 FEET OF 6 INCH POLY ALONG EAST LOUISIANA STREET AND ABANDON 1,924 FEET OF 2 INCH STEEL AND 848 FEET OF 6 INCH POLY IN MCKINNEY, COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY 340 080.72930 (128,237) INSTALL 1,000 OF 4 INCH POLY ALONG MOCKINGBIRD AND AIRLINE IN DALLAS AND ABANDON 1,400 FEET OF 16 INCH, 680 FEET OF 12 INCH AND 500 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY 341 080.72935 637 INSTALL 2750 FEET OF 4 INCH POLY AND 1150 FEET OF 2 INCH POLY ALONG RICHLAND AVENUE AND ABANDON 200 FEET OF 2 INCH STEEL, 800 FEET OF 2 INCH POLY AND 1900 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY 342 080.72949 (24) REPLACE MEASURING STATION 4613 IN ELLIS AND INSTALL 120 FEET OF 4 INCH STEEL. ALL CUSTOMERS ITALY SYSTEM IMPROVEMENT 343 080.72954 (3,092) INSTALL 1830 FEET OF 4 INCH POLY AND 620 FEET OF 2 INCH POLY ALONG BELKNAP STREET AND ABANDON 1345 FEET OF 4 INCH STEEL, 445 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 06 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS MEXIA SYSTEM INTEGRITY 344 080.72959 (2,014) INSTALL 850 FEET OF 4 INCH POLY AND 80 FEET OF 8 INCH STEEL AND ABANDON 93 FEET OF 2 INCH STEEL, 650 FEET OF 4 INCH STEEL AND 845 FEET OF 2 INCH POLY ALONG 8TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY 345 080.72970 (7,046) INSTALL 2400 FEET OF 2 INCH POLY AND 100 FEET OF 4 INCH STEEL ALONG BELKNAP STREET AND ABANDON 2900 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY 346 080.72973 (22,494) RELOCATE FACILITIES. INSTALL 722 FEET OF 4 INCH POLY AND ABANDON 514 FEET OF 4 INCH STEEL ALONG CRESTLINE ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES 347 080.72975 (7,234) RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY AND ABANDON 350 FEET OF 4 INCH STEEL IN THE CITY OF RICHLAND HILLS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS SYSTEM INTEGRITY 348 080.72978 79 RELOCATE FACILITIES. INSTALL 75 FEET OF 4 INCH STEEL AND ABANDON 75 FEET OF 4 INCH STEEL ALONG THE STREETS OF RICHLAND HILLS DUE TO CITY OF RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS RICHLAND HILLS RELOCATION OF FACILITIES 349 080.72983 9,387 INSTALL 4600 FEET OF 2 INCH AND 300 FEET OF 4 INCH POLY ALONG STREETS OF SAN ANGELO AND ABANDON 500 FEET OF 4 INCH STEEL, 2000 FEET OF 4 INCH STEEL AND 200 FEET OF 2 INCH STEEL, 1200 FEET OF 4 INCH, 300 FEET OF 3 INCH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY 350 080.72987 (6,851) INSTALL 2,250 FEET OF 2 INCH POLY AND ABANDON 410 FEET OF 2 INCH ADYL A, 250 FEET OF 2 INCH POLY AND 1,590 FEET OF 2 INCH STEEL ALONG THE STREETS OF ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 351 080.72988 (18,699) INSTALL 2,200 FEET OF 6 INCH AND 20 FEET OF 2 INCH POLY AND ABANDON 627 FEET OF 4 INCH, 540 FEET OF 2 INCH POLY AND 165 FEET OF 4 INCH, AND 636 FEET OF 2 INCH STEEL ALONG THE STREETS OF ABILIENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 352 080.72990 (3,433) INSTALL 1,150 FEET OF 2 INCH POLY AND ABANDON 1,150 FEET OF 2 INCH STEEL ALONG THE STREETS OF ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 353 080.72991 (26,896) INSTALL 2,530 FEET OF 2 INCH POLY ALONG THE STREETS OF ABILENE AND ABANDON 95 FEET OF 4 INCH, 250 FEET OF 2 INCH POLY AND 1,020 FEET OF 2 INCH, 1,165 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 354 080.73007 22 INSTALL 1860 FEET OF 2 INCH POLY AND ABANDON 200 FEET OF 2 INCH POLY AND 1750 FEET OF 2 INCH STEEL ALONG CRAIG STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 355 080.73024 (4,412) INSTALL 3,684 FEET OF 4 INCH POLY AND ABANDON 2,376 FEET OF 4 INCH STEEL, ABANDON 1,308 FEET OF 3 INCH STEEL ALONG SHARON STREET AND GRACE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 356 080.73025 1,137 RELOCATE FACILITIES. INSTALL 850 FEET OF 4 INCH POLY AND 1811 FEET OF 2 INCH POLY ALONG MEADOWBROOK DRIVE AND ABANDON 672 FEET OF 4 INCH AND 1811 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES 357 080.73026 4,566 RELOCATE FACILITIES. INSTALL 2210 FEET OF 4 INCH POLY. 292 FEET OF 2 INCH POLY AND ABANDON 599 FEET OF 4 INCH STEEL, 1611 FEET OF 3 INCH STEEL, 292 FEET OF 2 INCH STEEL ALONG HIGHLAND TO ACCOMMODATE CITY OF ARLINGTON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES 358 080.73027 5,981 INSTALL 2450 FEET OF 4 INCH AND 698 FEET OF 2 INCH POLY AND ABANDON 2450 FEET OF 4 INCH AND 470 FEET OF 2 INCH STEEL ALONG OVERHILL DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 359 080.73028 1,561 RELOCATE FACILITIES. INSTALL 1842 FEET OF 2 INCH POLY AND ABANDON 1592 FEET OF 2 INCH STEEL ALONG JOYCE STREET TO ACCOMMODATE CITY OF ARLINGTON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES 360 080.73029 (7,860) INSTALL 346 FEET OF 4 INCH AND 587 FEET OF 2 INCH POLY AND ABANDON 293 FEET IF 4 INCH AND 587 FEET OF 2 INCH STEEL ALONG OVERHILL DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 361 080.73031 (15,990) RELOCATE FACILITIES. INSTALL 1503 FEET OF 4 INCH AND 1124 FEET OF 2 INCH POLY ALONG BROWNING DRIVE AND ABANDON 845 FEET OF 4 INCH, 658 FEET OF 3 INCH AND 986 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES 362 080.73032 351 INSTALL 2665 FEET OF 4 INCH POLY ALONG STREETS OF ARLINGTON AND ABANDON 1033 FEET OF 4 INCH AND 1518 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 363 080.73033 (379) INSTALL 1,832 FEET OF 4 INCH POLY, 593 FEET OF 2 INCH POLY AND ABANDON 155 FEET OF 6 INCH STEEL, 1,585 FEET OF 4 INCH STEEL, 457 FEET OF 2 INCH STEEL ALONG EDNA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY MTX Retirements Page 10 of 45 510 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 364 080.73053 49,779 INSTALL 450 FEET OF 6 INCH, 1,120 FEET OF 4 INCH, AND 1,050 FEET OF 2 INCH POLY AND ABANDON 537 FEET OF 4 IN, 1210 FEET OF 2 IN STEEL AND 278 FEET OF 6 IN, AND 371 FEET OF 3 IN POLY ALONG MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY 365 080.73068 (3,525) INSTALL 485 FEET OF 4 INCH POLY AND 2225 FEET OF 2 INCH POLY AND ABANDON 300 FEET OF 3 INCH POLY, 1500 FEET OF 4 INCH STEEL, 640 FEET OF 4 INCH STEEL AND 680 FEET OF POLY ALONG MCDONALD STREET AND EAST 3RD STREET IN ACCORDANCE WITH THE TEXAS RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 366 080.73083 (485) INSTALL 2225 FEET OF 6 INCH POLY ALONG TRAIL LAKE DRIVE AND ABANDON 2225 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 367 080.73089 (1,144) INSTALL DISTRICT REGULATOR STATION 02, 140 FEET OF 2 INCH POLY ABANDON 140 FEET OF 2 INCH STEEL, DISTRICT REGULATOR STATION 02 ALONG BENNIE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWENA SYSTEM INTEGRITY 368 080.73094 (46) RELOCATE FACILITIES. INSTALL 2292 FEET OF 6 INCH POLY AND ABANDON 1782 FEET OF 6 INCH STEEL AND 674 FEET OF 6 INCH POLY ALONG US82 TO ACCOMMODATE CITY OF NOCONA HIGHWAY PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS NOCONA RELOCATION OF FACILITIES 369 080.73107 (61) INSTALL 1090 FEET OF 2 INCH POLY AND ABANDON 295 FEET OF 2 INCH STEEL, 809 FEET DUPONT, 53 FEET OF 2 INCH POLY, DISTRICT REGULATOR STATION 030 ALONG 14TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 370 080.73111 769 INSTALL 1040 FEET OF 2 INCH POLY AND ABANDON 48 FEET OF 2 INCH POLY, 211 FEET OF 2 INCH POLY, 11 FEET OF 3 INCH POLY, 322 FEET OF 2 INCH STEEL, 1006 FEET OF 3 INCH STEEL, AND DISTRICT REGULATOR STATION 07 ALONG THE STREETS OF GRANBURY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY 371 080.73137 2,429 INSTALL 965 FEET OF 2 INCH POLY ALONG CALVERT STREET AND ABANDON 1130 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HEARNE SYSTEM INTEGRITY 372 080.73147 (188) INSTALL 35 FEET OF 4 INCH, 10 FEET OF 4 INCH, AND 25 FEET OF 2 INCH POLY AND ABANDON 25 FEET OF 4 INCH STEEL, 15 FEET OF 2 INCH POLY, 10 FEET OF POLY AND DRS12 AT SUNSET DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 373 080.73159 (1,815) INSTALL 637 FEET OF 2 INCH, 352 FEET OF 4 INCH POLY ALONG MORSE STREET, JACKSON STREET AND HILL ALLEY STREET IN DENTON AND ABANDON 833 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY 374 080.73163 (2,635) RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY ALONG MELBA AND ABANDON 60 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 375 080.73164 (11,769) RELOCATE FACILITIES. INSTALL 3,100 FEET OF 2 INCH POLY ALONG HAVENHURST AND NESTLE DR AND ABANDON 2,950 FEET OF 2 INCH STEELAND 150 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY 376 080.73169 (11,416) RELOCATE FACILITIES. INSTALL 1400 FEET OF 12 INCH POLY, 10 FEET OF 6 INCH POLY, 70 FEET OF 4 INCH POLY, 50 FEET OF 2 INCH POLY ALONG E TERRELL AND ABANDON 1400 FEET OF 10 INCH STEEL, 10 FEET OF 6 INCH POLY, 10 FEET OF 4 INCH POLY, 10 FEET OF 3 INCH POLY TO ACCOMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES 377 080.73174 558 RELOCATE FACILITES. INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 183 FEET OF 2 INCH POLY ALONG SHEPHERD STREET TO ACCOMMODATE CITY OF IRVING STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES 378 080.73182 (43,830) INSTALL 5,600 FEET OF 4 INCH, 2,100 FEET OF 2 INCH POLY ALONG IRVING BOULEVARD BETWEEN SOWERS ROAD AND STRICKLAND PLAZA IN IRVING AND ABANDON 4,455 FEET OF 4 INCH, 68 FEET OF 3 INCH, 621 FEET OF 1.25 INCH, 84 FEET OF 2 INCH STEEL AND 283 FEET OF 4 INCH, 284 FEET OF 3 INCH, 1,147 FEET OF 2 INCH AND 885 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY 379 080.73194 1,099 INSTALL 1607 FEET OF 2 INCH POLY AND 2316 FEET OF 4 INCH POLY STREETS OF HILLSBORO AND ABANDON 1688 FEET OF 4 INCH STEEL, 188 FEET OF 3 INCH STEEL, 947 FEET OF 2 INCH STEEL AND 422 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 380 080.73221 1,638 INSTALL 525 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 5, 50 FEET OF 4 INCH STEEL, 390 FEET OF 3 INCH STEEL, 450 FEET OF 4 INCH POLY AND 720 FEET OF 2 INCH POLY ALONG MARBLE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WYLIE SYSTEM INTEGRITY 381 080.73224 (456) INSTALL 2300 FEET OF 2 INCH POLY ALONG 5TH STREET AND ABANDON DISTRICT REGULATOR STATION 02, 670 FEET OF 2 INCH STEEL, 1045 FEET OF 3 INCH STEEL, 40 FEET OF 3 INCH STEEL, 120 OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CRANDALL SYSTEM INTEGRITY 382 080.73226 4,742 INSTALL 1060 FEET OF 2 INCH POLY ALONG STREETS OF MESQUITE AND ABANDON 925 FEET OF 2 INCH STEEL, 955 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION 03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY 383 080.73228 3,961 INSTALL 2200 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 9, 710 FEET OF 4 INCH STEEL, 1215 FEET OF 3 INCH STEEL, 450 FEET OF 4 INCH POLY AND 430 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 384 080.73230 1,303 INSTALL (2) 8 INCH 3-WAY TEES, (2) 8 INCH TRANSITIONS, (1) 8 INCH POLY VALVE, 340 FEET OF 8 INCH POLY ALONG WYCLIFF AND ABANDON 340 FEET OF 10 INCH STEEL WITH ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 385 080.73238 82,429 INSTALL (1) 12 INCH X16 INCH FOLDING SHORT STOP, (1) 10 INCH 3 WAY TEE, (2) 12 INCH TRANSITIONS, (1) 12 INCH POLY VALVE, 55 FEET OF 12 INCH POLY AND ABANDON 55 FEET OF 16 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 386 080.73273 (11,398) INSTALL 3000 FEET OF 2 INCH POLY ALONG STREETS OF MESQUITE AND ABANDON 390 FEET OF 3 INCH CAST IRON, 1661 FEET OF 3 INCH STEEL AND 849 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY 387 080.73283 (92) INSTALL 900 FEET OF 2 INCH POLY AND ALONG GREY STREET AND ABANDON DISTRICT REGULATOR STATION 01, 525 FEET OF 4 INCH POLY, 350 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DEPORT SYSTEM INTEGRITY 388 080.73288 (1,379) INSTALL 1175 FEET OF 4 INCH POLY, 390 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 35, 230 FEET OF 4 INCH STEEL AND 460 FEET OF 2 INCH POLY AND 165 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS PARIS SYSTEM INTEGRITY 389 080.73297 (877) RELOCATE FACILITIES. INSTALL 80 FEET OF 4 INCH POLY, 900 FEET OF 6 INCH POLY, 45 FEET OF 8 INCH POLY, 20 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 17 FEET 4 INCH STEEL, 53 FEET OF 6 INCH CAST IRON, 365 FEET OF 6 INCH STEEL, 459 FEET OF 6 INCH POLY, 44 FEET OF 8 INCH STEEL, 12 FEET OF 2 INCH POLY, 55 FEET OF 4 INCH POLY, 16 FEET OF 6 INCH STEEL TO ACCOMODATE THE CITY OF FORT WORTH SEWAR PROJECT.ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES 390 080.73300 (773) INSTALL 2176 FEET OF 2 INCH POLY AND 1005 FEET OF 4 INCH POLY ALONG STREETS OF HILLSBORO AND ABANDON 312 FEET OF 3 INCH POLY, 1355 FEET OF VARIOUS SIZE STEEL AND 1582 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 391 080.73308 177 INSTALL 1,780 FEET OF 4 INCH, 30 FEET OF 6 INCH AND 60 FEET OF 2 INCH POLY AND ABANDON 1,340 FEET OF 4 INCH, 30 FEET OF 6 INCH, 390 FEET OF 3 INCH, AND 80 FEET OF 2 INCH STEEL ALONG MULBERRY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARCHER CITY SYSTEM INTEGRITY 392 080.73315 (6,833) INSTALL 2,200 FEET OF 6 INCH POLY ALONG CURTIS AND ALVORD IN QUANAH AND ABANDON 2,000 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY 393 080.73322 (153,654) INSTALL 3,135 FEET OF 8 INCH, 409 FEET OF 4 INCH, AND 2,358 FEET OF 2 INCH POLY ALONG MACARTHUR BOULEVARD IN IRVING AND ABANDON 3,135 FEET OF 8 INCH, 494 FEET OF 4 INCH, AND 448 FEET OF 2 INCH STEEL AND 80 FEET OF 4 INCH, 229 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY MTX Retirements Page 11 of 45 511 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 394 080.73327 688 RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY ALONG PRESTON ROAD AND ABANDON 292 FEET OF 4 INCH STEEL AND 49 FEET OF 4 POLY TO ACCOMODATE THE CITY OF SHERMAN STREET IMPROVEMENT PROJECT. ALL CUSTOMERS VAN ALSTYNE RELOCATION OF FACILITIES 395 080.73329 (10,798) RELOCATE FACILITIES.&NBSP; INSTALL 347 FEET OF 6 INCH POLY ALONG AVENUE A NEAR 4TH STREET AND ABANDON 226 FEET OF 6 INCH POLY DUE TO CITY OF TEMPLE PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY 396 080.73342 (219,224) INSTALL 123 FEET OF 4 INCH POLY ALONG 5TH STREET AND MAIN STREET AND ABANDON FRISCO DISTRICT REGULATOR STATION #01, 64 FEET OF 4 INCH STEEL AND 3 FEET OF 4 INCH, 38 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FRISCO SYSTEM INTEGRITY 397 080.73352 (250,920) INSTALL 1,309 FEET OF 8 INCH STEEL ALONG SMOTHERMAN ROAD IN LITTLE ELM AND ABANDON 1,266 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LITTLE ELM SYSTEM INTEGRITY 398 080.73358 1,792 RELOCATE FACILITIES. INSTALL 1900 FEET OF 4 INCH POLY ALONG SYMPHONY LANE AND ABANDON 1900 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 399 080.73371 2,440 INSTALL 1950 FEET OF 2 INCH, 500 FEET OF 4 INCH AND 3950 FEET OF 6 INCH POLY AND ABANDON 190 FEET OF 3 INCH, 2015 FEET OF 4 INCH, 450 FEET OF 4 INCH STEEL, 50 FEET OF 6 INCH POLY, 4760 FEET OF 8 INCH POLY AND 390 FEET OF 8 INCH STEEL AND DISTRICT REGULATOR STATION 93 ALONG SAMUEL BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 400 080.73387 1,451 RELOCATE FACILITIES. INSTALL 910 FEET OF 6 INCH POLY ALONG LEGACY DRIVE AND ABANDON 910 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF PLANO IMPROVMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS PLANO RELOCATION OF FACILITIES 401 080.73388 (161) RELOCATE FACILITIES. INSTALL 600 FEET OF 8 INCH POLY AND ABANDON 417 FEET OF 4 INCH STEEL AND 60 FEET OF 4 INCH POLY ALONG HIGHWAY 83-84 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE RELOCATION OF FACILITIES 402 080.73390 (22,455) INSTALL 2,200 FEET OF 6 INCH POLY ALONG BLUE MOUND ROAD AND ABANDON 2,130 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HASLET SYSTEM INTEGRITY 403 080.73406 761 INSTALL 2400 FEET OF 2 INCH POLY ALONG EAST TRAVIS STREET AND ABANDON 1150 FEET OF 2 INCH POLY, 1280 FEET OF 2 INCH STEEL, DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOLLAND SYSTEM INTEGRITY 404 080.73410 (2,142) INSTALL 3,170 FEET OF 2 INCH POLY ALONG CHO STREET AND ABANDON 1015 FEET OF 4 INCH STEEL, 215 FEET OF 2 INCH STEEL, 525 FEET OF 2 INCH STEEL, 1005 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 405 080.73411 (10,743) INSTALL 950 FEET OF 4 INCH AND 3,700 FEET OF 2 INCH POLY ALONG THE STREETS OF RICHLAND AVE AND BEE STREET IN FARMERS BRANCH AND ABANDON 950 FEET OF 4 INCH AND 3,700 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY 406 080.73413 (4,410) INSTALL 594 FEET OF 4 INCH, 1,836 FEET OF 2 INCH POLY AND ABANDON 330 FEET OF 4 INCH STEEL, 394 FEET OF 3 INCH POLY, AND 145 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY 407 080.73430 (325) RELOCATE FACILITIES. INSTALL 40 FEET OF 6 INCH POLY AND ABANDON 40 FEET OF 6 INCH POLY ALONG HICKIX ROAD. ALL CUSTOMERS ROWLETT RELOCATION OF FACILITIES 408 080.73442 (9,851) INSTALL 1,072 FEET OF 4 INCH AND 1,617 FEET OF 2 INCH POLY ALONG STREETS OF GRAND PRAIRIE AND ABANDON 378 FEET OF 4 INCH, 1410 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY 409 080.73450 (4,179) INSTALL 1400 FEET OF 2 INCH POLY ALONG STREETS OF MEXIA AND ABANDON 1400 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY 410 080.73452 (2,969) RELOCATE FACILITIES. INSTALL 1,380 FEET OF 2 INCH POLY ALONG WEST COMMERCE AND ABANDON 1,465 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY 411 080.73453 (9,350) INSTALL 1864 FEET OF 4 INCH AND 277 FEET OF 2 INCH POLY ALONG BARNETT STREET AND ABANDON 1830 FEET OF 3 INCH AND 180 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY 412 080.73454 (15,917) RELOCATE FACILITIES. INSTALL 1,933 FEET OF 4 INCH POLY ALONG NORTH STREET AND 538 FEET OF 2 INCH POLY ALONG ROBINSON AVENUE AND ABANDON 925 FEET OF 3 INCH POLY, 135 FEET OF 2 INCH POLY, 410 FEET OF 2 INCH STEEL AND 95 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE TEXAS RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY 413 080.73455 (20,097) INSTALL 2,692 FEET OF 2 INCH POLY ALONG FORD ST AND COLLEGE STREET AND 429 FEET OF 4 INCH POLY ALONG 5TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY 414 080.73457 (15,694) INSTALL 3,000 FEET OF 4 INCH, 200 FEET OF 2 INCH POLY ALONG CUSTER STREET IN RICHARDSON AND ABANDON 1,000 FEET OF 4 INCH STEEL AND 2,000 FEET OF 4 INCH, AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY 415 080.73460 (3,035) RELOCATE FACILITIES. INSTALL 1,550 FEET OF 2 INCH POLY ALONG PALESTINE STREET AND ABANDON 1,550 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS MEXIA SYSTEM INTEGRITY 416 080.73462 (7,562) RELOCATE FACILITIES. INSTALL 1,400 FEET OF 2 INCH POLY ALONG MCCLENDON STREET AND ABANDON 1,300 OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY 417 080.73468 2,945 INSTALL 4400 FEET OF 6 INCH POLY ABANDON 4100 FEET OF 2 INCH POLY AND 300 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY 418 080.73479 4 INSTALL 2345 FEET OF 4 INCH STEEL AND ABANDON 992 FEET OF 2 INCH STEEL AND 1802 FEET OF 3 INCH STEEL ALONG PINE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE. ALL CUSTOMERS BRUCEVILLE EDDY SYSTEM INTEGRITY 419 080.73493 (60,152) INSTALL 25 FEET OF 2 INCH AND 25 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #08 ALONG PARKSIDE AND CROSBY AND ABANDON DISTRICT REGUALATOR STATION AND 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH WITH THE RAILROAD COMMISSION OF TEXAS RULE OF 8.209. ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY 420 080.73497 (115,926) RELOCATE FACILIITES.&NBSP; INSTALL 2,648 OF 4 INCH POLY ALONG THE ALLEY OF BELMONT AVENUE AND ABANDON 811 FEET OF 2 INCH, 739 FEET OF 4 INCH, AND 622 FEET OF 3 INCH, AND 76 FEET OF 8 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 421 080.73514 (174,429) INSTALL 2,274 FEET OF 8 INCH AND 184 FEET OF 4 INCH POLY ALONG ROCHELLE ROAD AND MACARTHUR BOULEVARD AND ABANDON 1,411 FEET OF 8 INCH, 233 FEET OF 4 INCH, 73 FEET OF 3 INCH STEEL AND 159 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY 422 080.73517 (47,490) INSTALL 2,655 FEET OF 4 INCH, 970 FEET OF 2 INCH POLY ALONG CANADA DRIVE AND ABANDON 1,884 FEET OF 6 INCH AND 729 FEET OF 2 INCH STEEL AND 660 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 423 080.73523 1 INSTALL 2100 FEET OF 8 INCH AND 1100 FEET OF 2 INCH POLY ALONG TRAIL LAKE DRIVE AND ABANDON 2100 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 424 080.73531 (4,237) INSTALL 725 FEET OF 12 INCH POLY AND ABANDON 710 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 425 080.73546 3 INSTALL 20 FEET OF 4 INCH POLY AND ABANDON 25 FEET OF 4 INCH POLY ALONG BLUFF STREET.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 426 080.73557 (2,032) INSTALL 900 FEET OF 8 INCH POLY ALONG THE STREETS OF DALLAS AND ABANDON 900 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 427 080.73558 (17,739) INSTALL 2,267 FEET OF 2 INCH POLY ALONG STREETS OF GRAND PRAIRIE AND ABANDON 339 FEET OF 4 INCH AND 1,938 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY MTX Retirements Page 12 of 45 512 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 428 080.73574 (0) INSTALL 310 FEET OF 6 INCH POLY ALONG CEDAR AND ABANDON 297 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 429 080.73575 (52,733) RELOCATE FACILITIES. INSTALL 1,848 FEET OF 4 INCH POLY ALONG PARK STREET AND ABANDON 1,067 FEET OF 2 INCH AND 925 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 430 080.73576 (180) INSTALL 1415 FEET OF 2 INCH POLY MAPLE STREET AND PINE STREET AND ABANDON 3270 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GLENN HEIGHTS SYSTEM INTEGRITY 431 080.73579 (31,795) RELOCATE FACILIITIES. INSTALL 1,345 FEET OF 2 INCH, 2,925 FEET OF 6 INCH, 21 FEET OF .75 INCH ALONG ALTA MESA BOULEVARD AND ABANDON 950 FEET OF 1.25 INCH, 107 FEET OF 2 INCH POLY AND 2,900 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 432 080.73586 453 INSTALL 2205 FEET OF 2 INCH POLY ALONG ORANGE STREET AND ABANDON 185 FEET OF 2 INCH POLY, 395 FEET OF 3 INCH POLY, 1760 FEET OF 2 INCH STEEL AND DISTRTICT REGULATOR STATION 071 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 433 080.73587 (4,414) RELOCATE FACILITIES. INSTALL 1,691 FEET OF 4 INCH POLY ALONG PARK STREET AND ABANDON 764 FEET OF 3 INCH, 481 FEET OF 4 INCH, 245 FEET OF 2 INCH POLY AND 120 FEET OF 2 INCH STEEL,, 55 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 434 080.73592 (13,757) RELOCATE FACILITIES. INSTALL 1,296 FEET OF 4 INCH POLY ALONG GRAND AVE AND ABANDON 745 FEET OF 4 INCH STEEL, 568 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 435 080.73593 (10,227) INSTALL 642 FEET OF 4 INCH POLY AND 1926 FEET OF 2 INCH POLY ALONG STREETS OF GRAND PRAIRIE AND ABANDON 779 FEET OF 4 INCH STEEL AND 1273 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSIN OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY 436 080.73601 2,893 INSTALL 230 FEET OF 4 INCH POLY ALONG STREETS OF WALMART. ALL CUSTOMERS DALLAS SYSTEM IMPROVEMENT 437 080.73614 (14,827) RELOCATE FACILITIES. INSTALL 1364 FEET OF 4 INCH POLY ALONG MCFARLAND STREET AND ABANDON 902 FEET OF 4 INCH POLY, 215 FEET OF 3 INCH STEEL TO ACCOMODATE THE CITY OF KERRVILLE STREET IMPROVMENT PROJECT. ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES 438 080.73616 (3,191) INSTALL 207 POLY SERVICE LINES AND ABANDON 207 STEEL SERVICE LINES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 439 080.73618 (21) INSTALL 1115 FEET OF 2 INCH POLY AND 870 FEET OF 4 INCH POLY ALONG STREETS OF HILLSBORO AND ABANDON 770 FEET OF 2 INCH STEEL, 715 FEET OF 4 INCH STEEL, 155 FEET OF 4 INCH POLY AND 362 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 440 080.73626 4,234 RELOCATE FACILITIES. INSTALL 2630 FEET OF 2 INCH POLY ALONG CLINTON AVENUE AND ABANDON 4315 FEET OF 2 INCH AND 125 FEET OF 1.25 INCH STEEL AND 380 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES 441 080.73641 89 RELOCATE FACILITIES. INSTALL 260 FEET OF 2 INCH POLY AND ABANDON 250 FEET OF 2 INCH POLY ALONG FOREST PARK BOULEVARD TO ACCOMODATE THE CITY OF FORT WORTH STREET IMPROVMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES 442 080.73655 (19,604) INSTALL 2,050 FEET OF 2 INCH AND 887 FEET OF 4 INCH POLY ALONG THE STREETS OF CITY OF WACO AND ABANDON 1,960 FEET OF 3 INCH AND 820 FEET OF 4 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 443 080.73657 (355) INSTALL 765 FEET 2 INCH AND 1,955 FEET OF 4 INCH POLY ALONG N. 46TH STREET AND ABANDON 1,010 FEET OF 2 INCH AND 2,295 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 444 080.73671 (19,924) INSTALL 2,800 FEET OF 2 INCH POLY ALONG THE STREETS OF SQUIRE PLACE AND BEE STREET AND ABANDON 2,800 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY 445 080.73672 (5,075) RELOCATE FACILITIES. INSTALL 1,730 FEET OF 2 INCH POLY ALONG WEST MAIN AND ABANDON 1,460 FEET OF 4 INCH, 200 INCH OF 3 INCH STEEL AND, 746 INCH OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY 446 080.73678 (18,078) RELOCATE FACILITIES. INSTALL 325 FEET OF 2 INCH, 1,600 FEET OF 6 INCH POLY ALONG ALTA MESA BLVD AND ABANDON 1,575 FEET OF 6 INCH, 300 FEET OF 1.25 INCH, AND 8 FEET OF .75 INCH OF STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE OF 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 447 080.73695 10,503 RELOCATE FACILITIES. ABANDON 770 FEET OF 4 INCH POLY ALONG INWOOD ROAD TO ACCOMMODATE DEVELOPER INSTALLED PROJECT. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 448 080.73701 (21,517) RELOCATE FACILITIES. INSTALL 2,500 FEET OF 2 INCH POLY ALONG BALLINGER AND ABANDON 2,470 FEET OF 2 INCH POLY TO ACCOMODATE THE CITY OF GARLAND WATER, DRAINAGE AND CONCRETE IMPROVEMENTS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 449 080.73703 (1,598) RELOCATE FACILITIES. INSTALL 1,700 FEET OF 2 INCH POLY ALONG EAST 4TH AND ABANDON 1,140 FEET OF 2 INCH POLY TO ACCOMODATE THE CITY OF JOSHUA IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JOSHUA SYSTEM INTEGRITY 450 080.73720 (612) INSTALL 1555 FEET OF 4 INCH POLY ALONG TRENTMAN STREET AND ABANDON 1452 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 451 080.73729 11,556 INSTALL 1320 FEET OF 2 INCH POLY ALONG 10TH STREET AND ABANDON 1200 FEET OF 2 INCH, 353 FEET OF 3 INCH AND 47 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA SYSTEM INTEGRITY 452 080.73730 428 RELOCATE FACILITIES. INSTALL 500 FEET OF 4 INCH POLY AND 100 FEET OF 2 INCH POLY AND ABANDON 500 FEET OF 3 INCH STEEL AND 100 FEET OF 2 INCH STEEL ALONG PREVOST TO ACCOMODATE THE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES 453 080.73732 31 INSTALL 150 FEET OF 4 INCH AND 450 FEET OF 2 INCH POLY ALONG SOUTH 14TH AND PEACH AND ABANDON 462 FEET OF 4 INCH STEEL AND 64 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 454 080.73741 (3,008) INSTALL 1,200 FEET OF 4 INCH POLY AND ABANDON 3 INCH STEEL ALONG MACARTHUR DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 455 080.73745 (13,695) INSTALL 3,600 FEET OF 2 INCH AND 256 FEET OF 4 INCH POLY ALONG CAMP DRIVE AND GRICE STRET IN WACO AND ABANDON 3,415 FEET OF 2 INCH AND 278 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 456 080.73753 (318,003) INSTALL 700 FEET OF 2 INCH, 375 FEET OF 4 INCH, 3,250 FEET OF 6 INCH POLY ALONG SOUTH HULEN STREET AND ABANDON 25 FEET OF 2 INCH POLY, 750 FEET OF 2 INCH, 110 FEET OF 4 INCH AND 2,950 FEET OF 6 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 457 080.73755 (43,334) RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH, 2,525 FEET OF 4 INCH POLY ALONG WHISTLER DRIVE AND ABANDON 280 FEET OF 1.25 INCH AND 2,500 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8,209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 458 080.73761 (17,661) RELOCATE FACILITIES. INSTALL 2,475 FEET OF 6 INCH AND 20 FEET OF 4 INCH POLY ALONG KELLER HICKS ROAD AND ABANDON 2,200 FEET OF 4 INCH AND 150 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 459 080.73773 87,392 INSTALL 1914 FEET OF 4 INCH POLY ALONG MARTIN STREET AND ABANDON 1360 FEET OF 6 INCH POLY, 742 FEET OF 4 INCH POLY AND 214 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 460 080.73784 (493) RELOCATE FACILITIES. INSTALL 1583 FEET OF 2 INCH POLY ALONG EAST WARREN STREET AND ABANDON 1234 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF HEWITT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HEWITT RELOCATION OF FACILITIES 461 080.73787 252 INSTALL 875 FEET OF 2 INCH POLY ALONG WEST MUNSON AND ABANDON 470 OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY MTX Retirements Page 13 of 45 513 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 462 080.73793 (5,758) INSTALL 1,900 FEET OF 4 INCH AND 1,200 FEET OF 2 INCH POLY AND 200 FEET OF 8 INCH STEEL CASING. ABANDON 1,900 FEET OF 4 INCH AND 1,200 FEET OF 2 INCH STEEL ALONG RICHLAND AVENUE AND BEE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY 463 080.73807 (10,673) INSTALL DISTRICT REGULATOR STATION 02, 390 FEET OF 2 INCH POLY AND 115 FEET OF 4 INCH POLY ALONG SMITHE ROAD AND ABANDON 390 FEET OF 2 INCH STEEL AND 115 FEET OF 3 INCH STEEL AND DISTRICT REGULATOR STATION 02 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SCURRY SYSTEM INTEGRITY 464 080.73810 (1,891) INSTALL 300 FEET OF 2 INCH, 2,900 FEET OF 4 INCH POLY ALONG WHEELOCK DRIVE IN FORT WORTH AND ABANDON 2,800 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 465 080.73814 187 RELOCATE FACILITIES. INSTALL 1130 FEET OF 2 INCH POLY AND ABANDON 1130 FEET OF 2 INCH STEEL ALONG BOOKER T STREET TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES 466 080.73837 (2,691) INSTALL 2058 FEET OF 4 INCH POLY AND 273 FEET OF 2 INCH POLY ALONG STREETS OF GRAND PRAIRIE AND ABANDON 497 FEET OF 4 INCH STEEL AND 1276 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY 467 080.73839 (114,327) INSTALL 2,568 FEET OF 4 INCH POLY AND ABANDON 132 FEET OF 3 INCH, 18 FEET OF 4 INCH POLY, 111 FEET OF 3 INCH AND 2,899 FEET OF 4 INCH STEEL ALONG REDBUD DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY 468 080.73840 (22,580) RELOCATE FACILITIES. INSTALL 2,100 FEET OF 6 INCH POLY ALONG BUENA VISTA DRIVE AND ABANDON 2,100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY 469 080.73841 (141,343) INSTALL 2,684 FEET OF 3 INCH POLY AND ABANDON 2,684 FEET OF STEEL ALONG ANDERSON STREET IN ACCORDANCE WITH RAILROAD COMMISISON OF TEXAS RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY 470 080.73842 (8,470) INSTALL 2,710 FEET OF 2 INCH AND 400 FEET OF 6 INCH POLY AND ABANDON 1,870 FEET OF 2 INCH, 133 FEET OF 4 INCH POLY, 419 FEET OF 2 INCH AND 350 FEET OF 4 INCH STEEL ALONG HARMON ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSIOM OF TEXAS RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY 471 080.73845 (10,366) INSTALL 1,300 FEET OF 2 INCH POLY AND ABANDON 1,288 FEET OF 2 INCH POLY ALONG HARMON ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY 472 080.73846 (37,833) INSTALL 2,140 FEET OF 4 INCH POLY AND ABANDON 130 FEET OF 2 INCH POLY AND 977 FEET OF 3 INCH AND 1,357 FEET OF 4 INCH STEEL ALONG TREADWELL DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY 473 080.73847 (16,830) INSTALL 2,301 FEET OF 4 INCH POLY AND ABANDON 2,301 FEET OF 4 INCH STEEL ALONG SIMMONS STREET IN HURST IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY 474 080.73848 (18,557) INSTALL 1,350 FEET OF 2 INCH POLY ALONG RIDGECREST DRIVE AND POST OAK DRIVE IN HURST AND ABANDON 213 FEET OF 2 INCH, 1,004 FEET OF 3 INCH AND 1,550 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY 475 080.73849 (17,857) INSTALL 1,000 FEET OF 2 INCH AND 1,050 FEET OF 4 INCH POLY ALONG CROSSTIMBER DRIVE AND ABANDON 370 FEET OF 2 INCH AND 2,264 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY 476 080.73853 (3,762) RELOCATE FACILITIES. INSTALL 145 FEET OF 2 INCH POLY ALONG C STREET AND ABANDON 3/4 INCH POLY SERVICE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES 477 080.73859 (3,842) RELOCATE FACILITIES. INSTALL 2,000 FEET OF 4 INCH POLY ALONG WRIGLEY WAY AND ABANDON 1,950 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 478 080.73865 (37,160) INSTALL 2,201 FEET OF 4 INCH POLY ALONG THE STREETS OF NW 16TH IN FORT WORTH AND ABAONDON 764 FEET OF 4 INCH AND 394 FEET OF 6 INCH STEEL AND 669 FEET OF 3 INCH AND 371 FEET OF 2 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 479 080.73872 (9,407) INSTALL DISTRICT REGULATOR STATION #01 IN THE CITY OF ROSEBUD AND ABANDON DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ROSEBUD SYSTEM INTEGRITY 480 080.73876 (8,267) RELOCATE FACILITIES. INSTALL 245 FEET OF 2 INCH POLY ALONG HARRY HINES NEAR HUNT STREET IN DALLAS AND ABANDON 245 FEET OF 2 INCH POLY. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 481 080.73883 (4,987) INSTALL 2,250 FEET OF 2 INCH POLY ALONG WILTON DRIVE IN FORT WORTH AND ABANDON 1,875 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 482 080.73885 (13,200) ABANDON 760 FEET OF 1.25 INCH, 130 FEET OF 2 INCH AND 110 FEET OF 2 INCH POLY WITH 980 FEET OF 2 INCH POLY ALONG IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 483 080.73890 472 INSTALL 1517 FEET OF 4 INCH POLY AND 730 FEET OF 2 INCH POLY ALONG TRENTMAN STREET AND ABANDON 965 FEET OF 4 INCH STEEL, 610 FEET OF 2 INCH STEEL, 522 FEET OF 4 INCH POLY AND 84 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 484 080.73892 (12,235) INSTALL 2,750 FEET OF 2 INCH POLY AND ABANDON 2,725 FEET OF 2 INCH STEEL ALONG THE STREETS OF WHITMAN AVE IN FORT WORTH IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 485 080.73895 (37,314) RELOCATE FACILITIES. INSTALL 1,885 FEET OF 2 INCH, 1,180 FEET OF 4 INCH OF POLY ALONG GOULD ST AND ABANDON 601 FEET OF 1.25 INCH POLY AND, 351 FEET OF 2 INCH, 278 FEET OF 3 INCH STEEL, 1202 FEET OF 4 INCH POLY, 872 FEET OF 4 INCH AND 428 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 486 080.73896 (9,671) RELOCATE FACILIITIES. INSTALL 1,400 FEET OF 2 INCH POLY ALONG WEST BOWIE AND ABANDON 1,540 ON 2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209.ALL CUSTOMERS MEXIA SYSTEM INTEGRITY 487 080.73897 (12,265) INSTALL 500 FEET OF 4 INCH POLY ALONG LOOP 254 AND ABANDON 500 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER SYSTEM INTEGRITY 488 080.73903 (7,244) INSTALL 3,425 FEET OF 2 INCH POLY ALONG WINIFRED DRIVE IN FORT WORTH AND ABANDON 3,325 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 489 080.73908 (9,146) INSTALL 1586 FEET OF 4 INCH AND 715 FEET OF 2 INCH POLY ALONG STREETS OF GRAND PRAIRIE AND ABANDON 1529 FEET OF 4 INCH AND 973 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY 490 080.73914 (1) INSTALL DISTRICT REGULATOR STATION, 25 FEET OF 2 INCH POLY AND 25 FEET OF 4 INCH POLY ALONG STREETS OF KEMP AND ABANDON DISTRICT REGULATOR STATION 06, 25 FEET OF 3 INCH STEEL AND 25 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEMP SYSTEM INTEGRITY 491 080.73938 (511) RELOCATE FACILITIES. INSTALL 762 FEET OF 2 INCH POLY ALONG FM 932 AND ABANDON 355 FEET OF 2 INCH STEEL AND 390 FEET OF 2 INCH POLY TO ACCOMODATE TXDOT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HAMILTON RELOCATION OF FACILITIES 492 080.73941 (14,920) RELOCATE FACILITIES. INSTALL 3,200 FEET OF 2 INCH POLY ALONG MAIN AND ABANDON 442 FEET OF 2 INCH POLY, 750 FEET OF 2 INCH STEEL, 653 FEET OF 3 INCH STEEL, 263 FEET OF 4 INCH POLY AND 1092 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 493 080.73952 738 INSTALL 1845 FEET OF 2 INCH POLY AND 668 FEET OF 4 INCH POLY ALONG BROOKLINE AVENUE AND ABANDON 1703 FEET OF 3 INCH STEEL, 421 FEET OF 2 INCH STEEL, 180 FEET OF 2 INCH POLY AND 22 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 494 080.73959 324 INSTALL 3350 FEET OF 2 INCH POLY ALONG STREETS OF DETROIT AND ABANDON 1715 FEET OF 3 INCH STEEL, 460 FEET OF 2 INCH STEEL, 355 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DETROIT SYSTEM INTEGRITY 495 080.73965 (62,042) INSTALL 1,083 FEET OF 4 INCH AND 1,544 FEET OF 2 INCH POLY ALONG THE STREETS OF GRAND PRAIRIE AND ABANDON 1,443 FEET OF 4 INCH AND 573 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY MTX Retirements Page 14 of 45 514 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 496 080.73972 (3,762) RELOCATE FACILITIES. INSTALL 2,617 FEET OF 4 INCH POLY ALONG E. FAIRFAX AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 497 080.73979 (1,474) RELOCATE FACILITIES. INSTALL 40 FEET OF 4 INCH POLY ALONG COOPER LANE AND ABANDON 40 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF JOSHUA IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JOSHUA SYSTEM INTEGRITY 498 080.73983 (7,522) INSTALL 1,200 FEET OF 4 INCH AND 2,450 FEET OF 2 INCH POLY ALONG HAVENHURST STREET AND GOODLAND STREET IN FARMER BRANCH AND ABANDON 1,200 FEET OF 4 INCH AND 2,450 FEET 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY 499 080.73988 (14,583) INSTALL 3,300 FEET OF 2 INCH POLY ALONG RICHLAND AVENUE AND DENNIS LANE IN FARMERS BRANCH AND ABANDON 3,300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY 500 080.73994 (536,210) RELOCATE FACILITIES. INSTALL 1,275 FEET OF 4 INCH, AND 1,367 FEET OF 2 INCH POLY ALONG GRAND PRAIRIE NEIGHBORHOOD AND ABANDON 1,191 FEET OF 4 INCH STEEL, 1,025 FEET OF 2 INCH POLY IN ACCORDDANCE WITH THE RAILROAD COMMISSION OF TEXAS 8.209.ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY 501 080.74000 (163,900) RELOCATE FACILIITIES. INSTALL 2,362 FEET OF 4 INCH POLY ALONG ROCKWALL STREET AND ABANDON DISTRICT REGULATOR STATION #05 AND 576 FEET OF 2 INCH STEEL, 7 FEET OF 3 INCH STEEL, 898 FEET OF 4 INCH STEEL, 10 FEET OF 2 INCH POLY, 637 FEET OF 3 INCH POLY, 63 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSON OF TEXAS RULE 8,209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY 502 080.74002 (45,096) INSTALL 830 FEET OF 4 INCH POLY AND 840 FEET OF 2 INCH POLY ALONG STREETS OF TERRELL AND ABANDON 908 FEET OF 2 INCH STEEL, 778 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION 15 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS TERRELL SYSTEM INTEGRITY 503 080.74003 (83,162) INSTALL 2,200 OF 2 INCH POLY ALONG NORTH COLLEGE STREET AND ABANDON 2,000 FEET OF 2 INCH, 3 INCH, AND 4 INCH STEEL AND 6 INCH STEEL AND WAXAHACHIE DISTRICT REGULATOR STATION #15 IN ACCORDANCE WITH&NBSP; RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY 504 080.74005 31 INSTALL 400 FEET OF 2 INCH POLY ALONG BENNETT STREET AND ABANDON DISTRICT REGULATOR STATION 7 AND 400 FEET OF 3 INCH STEEL AND 30 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DETROIT SYSTEM INTEGRITY 505 080.74009 (11,591) INSTALL 75 FEET OF 6 INCH, 2,450 FEET OF 4 INCH, 300 FEET OF 2 INCH POLY ALONG THE STREETS OF KINGWOOD DRIVE AND ABANDON 55 FEET OF 6 INCH, 2,325 FEET OF 4 INCH STEEL, AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 506 080.74011 (42,815) INSTALL 2,365 FEET OF 2 INCH, 1,646 FEET OF 4 INCH POLY ALONG THE STREETS OF HUBBY AND WATT AVENUE AND ABANDON 800 FEET OF 4 INCH STEEL AND 1,155 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISISON OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 507 080.74027 (45) INSTALL 1270 FEET OF 2 INCH POLY ALONG HIAWATCH BOULEVARD AND ABANDON 1212 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 508 080.74028 (3,141) INSTALL 850 FEET OF 2 INCH POLY AND ABANDON 398 FEET OF 1.25 INCH STEEL AND 130 FEET OF 2 INCH POLY ALONG PAWHUSKA DR IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 509 080.74031 (9,847) INSTALL 875 FEET OF 2 INCH POLY AND ABANDON 800 FEET OF 2 INCH STEEL ALONG HIAWATHA BLVD IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 510 080.74032 (7,039) INSTALL 950 FEET OF 2 INCH POLY AND ABANDON 565 FEET OF 2 INCH STEEL AND 480 FEET OF 2 INCH POLY ALONG INDIAN HEIGHTS BLVD IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 511 080.74038 (24,953) INSTALL DISTRICT REGULATOR STATION #12, #23, #24 AND ABANDON DISTRICT REGULATOR STATION #12, #23, #24 ALONG THE STREETS OF THE CITY OF TERRELL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY 512 080.74039 (18,782) INSTALL 785 FEET OF 2 INCH, 160 FEET OF 6 INCH POLY ALONG ARTHUR AND AVE K IN WICHITA FALLS AND ABANDON 116 FEET OF 6 INCH, 75 FEET OF 4 INCH POLY, 311 FEET OF 4 INCH, 403 FEET OF 2 INCH AND 386 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 513 080.74040 (26,096) INSTALL 875 FEET OF 2 INCH POLY ALONG GARFIELD AND AVENUE J IN WICHITA FALLS AND ABANDON 467 FEET OF 2 INCH STEEL AND 1,021 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 514 080.74041 (20,243) INSTALL 1,600 FEET OF 2 INCH POLY ALONG KESSLER AVENUE AND HAYES STREET AND ABANDON 250 FEET OF 2 INCH, 1,035 FEET OF 4 INCH STEEL AND 458 FEET OF 2 INCH AND 430 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 515 080.74047 (2) INSTALL DISTRICT REGULATOR STATION 35, 25 FEET OF 2 INCH POLY AND 25 FEET OF 4 INCH POLY IN GREENVILLE AND ABANDON DISTRICT REGULATOR STATION 35, 90 FEET OF 4 INCH AND 90 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY 516 080.74048 (61,163) RELOCATE FACILITIES. INSTALL 305 FEET OF 2 INCH, 2,345 FEET OF 4 INCH POLY AND ABANDON 2,185 FEET OF 4 INCH STEEL, 100 FEET OF 3 INCH POLY AND 305 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 517 080.74054 (15,870) ABANDON 1,800 FEET OF 6 INCH STEEL TO ACCOMODATE OPTIMAIN PIPE REPLACEMENT ALONG BYRON AND CORNELL AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY 518 080.74078 77 ABANDON 271 FEET OF 3 INCH STEEL AND 222 FEET OF 3 INCH POLY ALONG NABERS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY 519 080.74079 (1,686) INSTALL 1693 FEET OF 2 INCH POLY AND 2005 FEET OF 4 INCH POLY ALONG EAST BURLESON STREET AND ABANDON 715 FEET OF 2 INCH STEEL, 505 FEET OF 3 INCH STEEL, 205 FEET OF 4 INCH STEEL, 425 FEET OF 4 INCH POLY, 100 FEET OF 3 INCH POLY AND 650 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS MART SYSTEM INTEGRITY 520 080.74086 (12,624) INSTALL 550 FEET OF 8 INCH AND 200 FEET OF 4 INCH POLY ALONG THE STREETS OF MIDWAY AND SPRING VALLEY AND ABANDON 550 FEET OF 8 INCH STEEL AND 200 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ADDISON SYSTEM INTEGRITY 521 080.74087 (3,874) INSTALL 685 FEET OF 2 INCH, 775 FEET OF 4 INCH POLY ALONG NORTHWEST 15TH STREET AND ABANDON 898 FEET OF 3 INCH, 539 FEET OF 4 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION OF RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 522 080.74098 (15,370) RELOCATE FACILITIES. INSTALL 1,250 FEET OF 2 INCH POLY ALONG CHURCH STREET AND ABANDON 570 FEET OF 2 INCH POLY, 400 FEET OF 2 INCH AND 860 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 523 080.74114 (12,812) INSTALL 4,238 FEET OF 4 INCH POLY ALONG HOLFORD ROAD AND ABANDON 4,149 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 524 080.74119 (35,771) INSTALL 2,157 FEET OF 2 INCH AND 1,721 FEET OF 4 INCH POLY ALONG FORT AVENUE AND HUBBY AVENUE AND ABANDON 1,090 FEET OF 4 INCH, 317 FEET OF 3 INCH STEEL AND 1,389 FEET OF 4 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY 525 080.74121 (157,029) INSTALL 3,350 FEET OF 2 INCH POLY ALONG PEMBROKE DRIVE IN FORT WORTH AND ABANDON 420 FEET OF 6 INCH AND 1,550 FEET OF 6 INCH, 3,300 FEET OF 4 INCH AND 79 FEET STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 526 080.74122 (892) INSTALL 1028 FEET OF 4 INCH POLY ALONG STREETS OF FORT WORTH AND ABANDON 855 FEET OF 4 INCH STEEL, 158 FEET OF 3 INCH STEEL, 71 FEET OF 6 INCH STEEL AND 46 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 527 080.74127 (4,101) RELOCATE FACILITIES. INSTALL 310 FEET OF 4 INCH POLY ALONG FOREST LN AND ABANDON 270 FEET OF 4 INCH POLY TO ACCOMODATE PLC/TXDOT. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 528 080.74136 421 RELOCATE FACILITIES. INSTALL 160 FEET OF 4 INCH POLY AND ABANDON 140 FEET OF 4 INCH STEEL ALONG LIVINGSTON DRIVE TO ACCOMMODATE CITY OF HURST STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST RELOCATION OF FACILITIES MTX Retirements Page 15 of 45 515 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 529 080.74137 (14,231) INSTALL 700 FEET OF 6 INCH, 1,200 FEET OF 4 INCH AND 650 FEET OF 2 INCH POLY ALONG JOHNS WAY IN FORT WORTH AND ABANDON 700 FEET OF 6 INCH, 1,200 FEET OF 4 INCH AND 400 FEET OF 2 INCH STEEL AND 250 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 530 080.74140 (2,133) RELOCATE FACILITIES. INSTALL 880 FEET OF 2 INCH POLY AND ABANDON 880 FEET OF 2 INCH STEEL ALONG CROWN ROAD TO ACCOMODATE CITY OF FORT WORTH PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES 531 080.74159 (13,964) INSTALL 1,000 FEET OF 8 INCH POLY ALONG FISHER STREET, 3,255 FEET OF 4 INCH POLY AND 200 FEET OF 2 INCH POLY ALONG LIND AND SPENCE STREETS AND ABANDON 190 FEET OF 1.25 INCH, 25 FEET OF 2 INCH POLY AND 735 FEET OF 2 INCH, 685 FEET OF 4 INCH STEEL, 1,050 FEET OF 4 INCH POLY, AND 650 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY 532 080.74174 (5,830) INSTALL 3,575 FEET OF 2 INCH POLY ALONG FIESTA CIRCLE AND ABANDON 3,550 FEET OF 2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 533 080.74184 (3,745) RELOCATE FACILITIES. INSTALL 2,300 FEET OF 2 INCH POLY ALONG S. DENTON STREET AND ABANDON 2,300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS MEXIA SYSTEM INTEGRITY 534 080.74188 (10,240) INSTALL 1,936 FEET OF 2 INCH, 842 FEET OF 4 INCH AND 2,008 FEET OF 8 INCH POLY ALONG JACKSON, 10TH, CLAY AND AUSTIN STREET IN KAUFMAN AND ABANDON 465 FEET OF 4 INCH AND 417 FEET OF 2 INCH POLY AND 2,148 FEET OF 3 INCH, 1,126 FEET OF 2INCH STEEL ALL CUSTOMERS KAUFMAN SYSTEM INTEGRITY 535 080.74208 (3,120) INSTALL 1690 FEET OF 2 INCH POLY ALONG NORTH MAIN STREET AND ABANDON 290 FEET OF 2 INCH AND 70 FEET OF 4 INCH POLY AND 1166 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY 536 080.74257 (6,810) INSTALL 1,250 FEET OF 2 INCH AND 2,000 FEET OF 4 INCH POLY ALONG DENTON DRIVE AND HAVENHURST STREET IN FARMERS BRANCH AND ABANDON 1,250 FEET OF 2 INCH AND 2,000 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY 537 080.74259 (1,667) INSTALL 1500 FEET OF 6 INCH POLY AND ABANDON 1200 FEET OF 3 INCH STEEL ALONG WYCON DRIVE ALL CUSTOMERS WACO SYSTEM IMPROVEMENT 538 080.74260 (96,042) RELOCATE FACILITIES. INSTALL 3,000 OF 4 INCH AND 1,500 OF 2 INCH POLY ALONG THE STREETS OF FERRIS, TEXAS AND ABANDON 6,500 FEET OF 2 INCH, 3 INCH STEEL AND ABANDON DISTRICT REGULATOR STATION 03 IN ACCAORDAINCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FERRIS SYSTEM INTEGRITY 539 080.74266 (6,264) RELOCATE FACILITIES. INSTALL 1,696 FEET OF 2 INCH, 815 FEET OF 4 INCH POLY ALONG SHACKLEFORD STREET AND ABANDON 1,687 FEET OF 2 INCH, 739 FEET OF 4 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 540 080.74295 (158,378) RELOCATE FACILITIES. INSTALL 2,990 FEET OF 4 INCH AND 690 FEET OF 2 INCH POLY ALONG SHILOH ROAD AND ABANDON 2,850 FEET OF 8 INCH, 80 FEET OF 6 INCH, 80 FEET OF 4 INCH, 560 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 541 080.74299 (102,314) INSTALL 3,500 FEET OF 4 INCH, 1,500 FEET OF 2 INCH POLY ALONG ALMOND DRIVE AND ABANDON 1,500 FEET OF 1.25 INCH, 3,300 FEET OF 2 INCH, 150 FEET OF 3 INCH AND 600 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISISON OF TEXAS RULE 8.209.ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY 542 080.74305 (18,496) INSTALL 3,400 FEET OF 2 INCH POLY AND 100 FEET OF 4 INCH STEEL CASING ALONG W. FANNIN STREET AND ABANDON DISTRICT REGULATOR STATION #18, 2,855 FEET OF 4 INCH, 379 FEET OF 3 INCH AND 40 FEET OF 2 INCH STEEL, AND 594 FEET OF 4 INCH, 437 FEET OF 3 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY 543 080.74312 (300) INSTALL DISTRICT REGULATOR STATION 01 ALONG CHAMBERS STREET AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS NEWARK SYSTEM INTEGRITY 544 080.74313 (65,647) RELOCATE FACILITIES. INSTALL 3,110 FEET OF 4 INCH POLY ALONG HIGHWOOD DRIVE AND ABANDON 3,105 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 545 080.74318 (9,836) INSTALL DISTRICT REGULATOR STATION DRS01, 30 FEET OF 3 INCH, 12 FEET OF 2 INCH STEEP AND 30 FEET OF 2 INCH POLY ALONG THE STREETS OF ODELL, WILBARGER COUNTY.ALL CUSTOMERS ODELL SYSTEM INTEGRITY 546 080.74320 (29,311) INSTALL DISTRICT REGULATOR STATION 04, 80 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 04, 210 FEET OF 4 INCH POLY, 59 FEET OF 4 INCH STEEL, AND 37 FEET OF 4 INCH STEEL ALONG E 4TH STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 547 080.74321 (19,366) INSTALL 3,150 FEET OF 4 INCH AND 30 FEET OF 2 INCH POLY ALONG MOTLEY DRIVE ALLEY AND ABANDON 2,490 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 548 080.74328 289 RELOCATE FACILITIES. INSTALL 700 FEET OF 4 INCH POLY ALONG WILLIAMSON DRIVE AND ABANDON 700 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES 549 080.74335 (4,893) INSTALL 2,437 FEET OF 4 INCH POLY AND ABANDON 2,421 FEET OF 2 INCH STEEL ALONG PECOS STREET IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 550 080.74340 466 INSTALL 775 FEET OF 2 INCH POLY ALONG SAN CARLOS AND ABANDON 590 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY 551 080.74341 (71,781) INSTALL 1,800 FEET OF 2 INCH POLY ALONG AVENUE H AND ABANDON 2,170 FEET OF 4 INCH AND 80 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8,209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 552 080.74343 (38,698) INSTALL 1,467 FEET OF 6 INCH, 1,773 FEET OF 4 INCH POLY AND ABANDON 1,467 FEET OF 6 INCH, 10 FEET OF 4 INCH, 1,763 FEET OF 3 INCH STEEL ALONG PARK ROW AVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 553 080.74344 (18,935) INSTALL 2,736 OF 4 INCH AND 635 FEET OF 2 INCH POLY AND ABANDON 2,696 FEET OF 3 INCH, 595 OF 2 INCH STEEL ALONG PARK ROW DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 554 080.74345 (8,304) RELOCATE FACILITIES. INSTALL 1,486 FEET OF 4 INCH AND 1,733 FEET OF 2 INCH POLY AND ABANDON 875 FEET OF 4 INCH AND 1,117 FEET OF 2 INCH STEEL AND 611 FEET OF 4 INCH AND 616 FEET OF 2 INCH POLY ALONG THE STREETS OF MOORE, KELLY AND HARMON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 555 080.74346 (78,806) RELOCATE FACILITIES. INSTALL 1,657 FEET OF 4 INCH AND 1,178 FEET OF 2 INCH POLY AND ABANDON 887 FEET OF 4 INCH, 770 FEET OF 3 INCH, 1,178 FEET OF 2 INCH STEEL ALONG THE STREETS OF MEADOW, FORRESTAL AND KELLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 556 080.74347 (54,893) RELOCATE FACILITIES. INSTALL 3,821 FEET OF 2 INCH POLY AND ABANDON 3,560 FEET OF 2 INCH STEEL ALONG THE STREETS OF KELLY, FORRESTAL AND HARMONY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 557 080.74348 (31,134) RELOCATE FACILIITES. INSTALL 2,160 FEET OF 4 INCH POLY AND ABANDON 2,160 FEET OF 3 INCH STEEL ALONG CARSWELL TERRACE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 558 080.74349 (44,129) INSTALL 2,309 FEET OF 4 INCH, 1,151 FEET OF 2 INCH POLY ALONG WYNN TERRACE AND BIGGS TERRACE IN ARLINGTON AND ABANDON 2,309 FEET OF 4 INCH, 1,126 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 559 080.74353 (130,060) INSTALL 2,307 FEET OF 2 INCH AND 1,581 FEET OF 4 INCH POLY AND ABANDON 3,765 FEET OF 4 INCH STEEL ALONG FORT AVE, HARLAN AVE, AND SANGER AVE IN WACO, MCCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY MTX Retirements Page 16 of 45 516 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 560 080.74356 (288,276) INSTALL 1,615 FEET OF 2 INCH AND 2,300 FEET OF 4 INCH POLY AND ABANDON 3,534 FEET OF 4 INCH, 317 FEET OF 3 INCH STEEL AND 329 FEET OF 4 INCH AND 259 FEET OF 6 INCH POLY ALONG THE STREETS OF WACO AND MORROW DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 561 080.74362 (1,416) INSTALL 1628 FEET OF 2 INCH POLY MAIN AND 768 FEET OF 4 INCH POLY MAIN ALONG EAST COWAN STREET AND ABANDON 318 FEET OF 2 INCH POLY, 4 FEET OF 2 INCH STEEL, 1181 FEET OF 3 INCH STEEL, 167 FEET OF 4 INCH POLY AND 708 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY 562 080.74386 (12,155) INSTALL DISTRICT REGULATOR STATION AND 190 FEET OF 6 INCH, 1150 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY ALONG COLLEGE STREET AND ABANDON DISTRICT REGULATOR STATION AND 3,135 FEET OF 6 INCH, 500 FEET OF 4 INCH, 610 FEET OF 3 INCH STEEL, 225 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY 563 080.74402 (10,026) INSTALL 1,112 FEET OF 4 INCH POLY AND ABANDON 195 FEET OF 2 INCH POLY AND 716 FEET OF 2 INCH, 103 FEET OF 3 INCH STEEL ALONG AUSTIN AND TRAVIS STREET IN ACCORDANCE TO THE TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS ROANOKE SYSTEM INTEGRITY 564 080.74404 (5,320) INSTALL 1,730 FEET OF 2 INCH POLY ALONG VINETTA DRIVE AND ABANDON 1,737 FEET OF 2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 565 080.74408 (462) INSTALL 1825 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG CHICAGO STREET AND ABANDON 110 FEET OF 2 INCH POLY AND 2465 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 566 080.74410 (35,181) INSTALL 2,165 FEET OF 2 INCH AND 1,020 FEET OF 4 INCH POLY AND ABANDON 1,075 FEET OF 6 INCH AND 2,085 FEET OF 3 INCH STEEL. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 567 080.74415 (23,782) INSTALL 2,325 FEET OF 2 INCH AND 2,675 FEET OF 4 INCH POLY AND ABANDON 520 FEET OF 6 INCH, 1,485 FEET OF 4 INCH, AND 2,995 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 568 080.74416 (44,585) INSTALL 2, 325 FEET OF 2 INCH, 660 FEET OF 4 INCH POLY AND ABANDON 340 FEET OF 6 INCH, 2,990 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 569 080.74417 (17,764) INSTALL 2,325 FEET OF 2 INCH AND 895 FEET OF 4 INCH POLY AND ABANDON 675 FEET OF 6 INCH, 2,355 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 570 080.74418 (45,235) INSTALL 3,565 FEET OF 4 INCH POLY AND ABANDON 3,565 FEET OF 6 INCH STEEL IN THE ALLEY SOUTH OF GROSS FROM FREEPORT TO LA PRADA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 571 080.74419 (38,489) INSTALL 3,565 FEET OF 2 INCH AND 325 FEET OF 4 INCH POLY AND ABANDON 325 FEET OF 6 INCH AND 3,460 FEET OF 3 INCH STEEL. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 572 080.74421 (26,617) INSTALL 3,795 FEET OF 2 INCH AND 635 FEET OF 4 INCH POLY AND ABANDON 660 FEET OF 6 INCH, 3,600 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 573 080.74422 (40,543) INSTALL 1,615 FEET OF 2 INCH AND 1,745 FEET OF 4 INCH POLY AND ABANDON 1,815 FEET OF 4 INCH, 1,020 FEET OF 3 INCH, 650 FEET OF 2 INCH STEEL AND 10 FEET OF 2 INCH POLY.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 574 080.74425 (8,861) INSTALL 2,420 FEET OF 2 INCH POLY ALONG HIGHWOOD DRIVE AND ABANDON 2,420 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 575 080.74430 (3,903) INSTALL 1,483 FEET OF 4 INCH POLY ALONG MOBERLY STREET AND ABANDON 1,397 FEET ON 2 INCH STEEL AND 72 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 576 080.74433 (132,149) INSTALL 100 FEET OF 4 INCH, 15 FEET OF 6 INCH AND 2,900 FEET OF 8 INCH POLY AND ABANDON 2,170 FEET OF 8 INCH, 150 FEET OF 6 INCH, 120 FEET OF 3 INCH, 130 FEET OF 2 INCH STEEL AND 50 FEET OF 3 INCH POLY ALONG SOUTH POLK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 577 080.74435 (1,075) RELOCATE FACILITIES. INSTALL 780 FEET OF 2 INCH POLY AND ABANDON 760 FEET OF 2 INCH STEEL ALONG JEFFERSON STREET TO ACCOMMODATE CITY OF COCKRELL HILL STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COCKRELL HILL RELOCATION OF FACILITIES 578 080.74439 (22,388) INSTALL 2,334 FEET OF 2 INCH POLY ALONG TIMBERVIEW AND ABANDON 2,310 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 579 080.74440 (21,043) INSTALL 2,455 FEET OF 4 INCH POLY ALONG RUTZ AND ABANDON 1,950 FEET OF 2 INCH , 355 FEET OF 1.25 INCH POLY AND 60 FEET OF 1.25 STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 580 080.74441 (14,604) INSTALL 1,660 FEET OF 2 INCH POLY ALONG CHIHUAHUA AND ABANDON 1,890 FEET OF 2 INCH STEEL AND 395 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 581 080.74442 (8,346) INSTALL 3,090 FEET ON 2 INCH, 515 FEET OF 4 INCH POLY ALONG KRAT STREET AND ABANDON 3,820 FEET OF 2 INCH, STEEL AND 190 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 582 080.74443 30,624 INSTALL 2,925 FEET OF 2 INCH POLY ALONG MERRELL STREET AND ABANDON 2,335 FEET OF 4 INCH, 65 FEET OF 3 INCH, 645 FEET OF 2 INCH STEEL AND 25 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 583 080.74450 (5,100) RELOCATE FACILITIES. INSTALL 275 FEET OF 4 INCH AND 85 FEET OF 2 INCH POLY ALONG KENLEY STREET AND ABANDON 275 FEET OF 4 INCH AND 130 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES 584 080.74454 (43,490) INSTALL 2,664 FEET OF 4 INCH POLY AND ABANDON 2,664 FEET OF 3 INCH STEEL ALONG CONNALLY TERRACE SUBDIVISION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 585 080.74457 (2) RELOCATE FACILITIES. INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 299 FEET OF 4 INCH POLY AND 84 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY PAVING PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON RELOCATION OF FACILITIES 586 080.74458 (23,383) INSTALL 2,125 FEET OF 2 INCH POLY AND ABANDON 2,020 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY ALONG THE STREETS OF BIGGS TERRACE AND BIGGS CIRCLE IN ACCORDANE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 587 080.74459 (23) INSTALL DISTRICT REGULATOR STATION 18 ALONG BAIRD STREET AND ABANDON DISTRICT REGULATOR STATION 18 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY 588 080.74466 (26,218) INSTALL 2,519 FEET OF 8 INCH POLY ALONG FISHER STREET AND 1,300 FEET OF 4 INCH POLY ALONG HODGE STREET AND ABANDON 135 FEET OF 4 INCH, 140 FEET OF 2 INCH, 115 FEET OF 3 INCH, 330 FEET OF 6 INCH POLY AND 490 FEET OF 2 INCH, 445 FEET OF 3 INCH, AND 1,625 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY 589 080.74471 (173,338) INSTALL 2,600 FEET OF 8 INCH, 505 FEET OF 2 INCH, AND 100 FEET OF 4 INCH POLY AND ABANDON 2,620 FEET OF 8 INCH, 485 FEET OF 4 INCH AND 565 FEET OF 3 INCH STEEL ALONG POLK FROM CAMP WISDOM SOUTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 590 080.74475 (15,899) INSTALL 2,795 FEET OF 2 INCH POLY ALONG SOUTH BAUGH STREET AND ABANDON 2,745 FEET OF 2 INCH STEEL AND 720 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS ALVARADO SYSTEM INTEGRITY 591 080.74477 (101) RELOCATE FACILITIES. INSTALL 160 FEET OF 2 INCH POLY AND ABANDON ONE 1.25 INCH POLY ALONG OLDHAM LANE. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 592 080.74490 (9,498) INSTALL 1,200 FEET OF 2 INCH , 1,130 FEET OF 4 INCH POLY ALONG COWAN STREET AND ABANDON 16 FEET OF 2 INCH STEEL, 160 FEET OF 3 INCH POLY, 1,170 FEET OF 3 INCH STEEL, 120 FEET OF 4 INCH POLY, 1,045 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS MART SYSTEM INTEGRITY 593 080.74491 94 RELOCATE FACILITIES. INSTALL 180 FEET OF 4 INCH AND 26 FEET OF 2 INCH POLY AND ABANDON 180 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DALLAS TXDOT ROADWAY PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 594 080.74501 6,661 RELOCATE FACILITIES. INSTALL 1000 FEET OF 2 INCH POLY AND ABANDON 1000 FEET OF 2 INCH POLY ALONG CINNABAR DRIVE TO ACCOMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES MTX Retirements Page 17 of 45 517 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 595 080.74511 (47,251) INSTALL 2,910 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 4 INCH, 2215 FEET OF 3 INCH AND 375 FEET OF 8 INCH STEEL ALONG THE STREETS OF COOGAN DRIVE AND ROYAL LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 596 080.74514 (25,676) INSTALL 3,395 FEET OF 2 INCH POLY NEAR THE INTERSECTION OF ALLEGHENY DRIVE AND COOGAN DRIVE AND ABANDON 902 FEET OF 2 INCH, 2,790 FEET OF 3 INCH STEEL AND 300 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 597 080.74515 (24,425) INSTALL 3,270 FEET OF 2 INCH AND 1,010 FEET OF 4 INCH POLY AND ABANDON 575 FEET OF 2 INCH, 2,325 FEET OF 3 INCH AND 1,005 FEET OF 6 INCH STEEL ALONG THE ALLEY NORTH AND SOUTH OF FLOWERDALE LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 598 080.74532 (80,783) INSTALL 1,635 FEET OF 2 INCH AND 1,915 FEET OF 4 INCH POLY ALONG WOODWIND STREET AND ABANDON 1,100 FEET OF 2 INCH, 1,815 FEET OF 4 INCH AND 430 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 599 080.74535 (27,017) ABANDON DISTRICT REGULATOR STATION # 175, 5 FEET OF 3 INCH, 20 FEET OF 4 INCH AND 10 FEET OF 6 INCH STEEL ALONG MAY STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 600 080.74539 (3,288,679) INSTALL 3,000 FEET OF 16 INCH STEEL AND ABANDON 3,000 FEET OF 16 INCH STEEL ALONG ALEMEDA STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 601 080.74545 (23,144) INSTALL 3,750 FEET OF 2 INCH POLY ALONG KRAFT STREET AND ABANDON 3,175 FEET OF 2 INCH AND 105 FEET OF 1.25 INCH STEEL AND 470 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 602 080.74553 (10,419) ABANDON 4,101 FEET OF 6 INCH AND 2,135 FEET OF 2 INCH STEEL ALONG THE STREETS OF WILMER IN DALLAS COUNTY. ALL CUSTOMERS WILMER RELOCATION OF FACILITIES 603 080.74556 (1,317) INSTALL 2585 FEET OF 2 INCH POLY ALONG SHAW STREET AND ABANDON 2555 FEET OF 2 INCH STEEL AND 30 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 604 080.74559 1,422 INSTALL 2600 FEET OF 2 INCH POLY ALONG LIFE AVENUE AND ABANDON 2515 FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 605 080.74565 (2,184) INSTALL 3,288 FEET OF 4 INCH, 5 FEET OF 2 INCH POLY ALONG OLD LIMESTONE COUNTY ROAD AND ABANDON 202 FEET OF 2 INCH, 2,055 FEET OF 4 INCH STEEL AND 1,025 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS MART SYSTEM INTEGRITY 606 080.74568 (27,620) INSTALL 2,500 FEET OF 2 INCH AND 1,150 FEET OF 4 INCH POLY ALONG GRIM AVENUE AND GORMAN AVENUE IN WACO AND ABANDON 2,100 FEET OF 2 INCH, 740 FEET OF 4 INCH STEEL AND 302 FEET OF 2 INCH AND 470 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 607 080.74571 (38,466) INSTALL 175 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #01 AND ABANDON 375 FEET OF 3 INCH STEEL AND DISTRICT REGULATOR STATION #01 ALONG MAIN STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SAINT JO SYSTEM INTEGRITY 608 080.74572 (16,719) INSTALL DISTRICT REGULATOR STATION #02 ALONG SOUTH LINE STREET IN SAINT JO AND ABANDON DISTRICT REGULATOR STATION #02 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAINT JO SYSTEM INTEGRITY 609 080.74575 (167,352) INSTALL 1,880 FEET OF 2 INCH POLY ALONG HOUSTON STREET AND CUTLER STREET IN TIOGA AND ABANDON DISTRICT REGULATOR STATION #01 AND 947 FEET OF 4 INCH, 3 FEET OF 3 INCH STEEL AND 1,380 FEET OF 4 INCH AND 61 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TIOGA SYSTEM INTEGRITY 610 080.74580 673 INSTALL DISTRICT REGULATOR STATION 01 ALONG WEST MAIN STREET AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BELLS SYSTEM INTEGRITY 611 080.74582 (3,698) INSTALL DISTRICT REGULATOR STATION #06 AT INTERSECTION OF NORTH BOND STREET AND EAST ALAMEDA STREET IN IOWA PARK AND ABANDON REGULATOR DISTRICT STATION #06 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY 612 080.74583 (16,828) INSTALL DISTRICT REGULATOR STATION #07 AT THE INTERSECTION OF NORTH COLORADO STREET AND WEST TEXAS AVENUE IN IOWA PARK AND ABANDON DISTRICT REGULATOR STATION #07 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY 613 080.74586 (49,164) INSTALL DISTRICT REGULATOR STATION #101 AND 125 FEET OF 2 INCH AND 50 FEET OF 4 INCH POLY ALONG PARK STREET AND ABANDON 20 FEET OF 2 INCH, 50 FEET OF 4 INCH POLY AND 10 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION #101 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 614 080.74591 (31,744) INSTALL 325 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #53 ALONG NORTH BROADWAY STREET AND ABANDON 19 FEET OF 3 INCH, 303 FEET OF 4 INCH, AND 16 FEET OF 6 INCH POLY AND 41 FEET OF 3 INCH AND 12 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION #53 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 615 080.74592 (13,765) INSTALL 975 FEET OF 2 INCH AND 45 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #20 ALONG 15TH STREET AND ABANDON 1,125 FEET OF 4 INCH, 23 FEET OF 2 INCH POLY AND 109 FEET OF 4 INCH, 25 FEET OF 8 INCH AND 385 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 616 080.74599 (4,211) INSTALL DISTRICT REGULATOR STATION #25 AT THE INTERSECTION OF NORTH AVENUE B AND EAST MAIN STREET IN OLNEY AND ABANDON DISTRICT REGULATOR STATION #25 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY SYSTEM INTEGRITY 617 080.74601 4,938 INSTALL 290 FEET OF 2 INCH POLY AND 150 FEET OF 4 INCH POLY AND ABANDON 460 FEET OF 2 INCH POLY AND 140 FEET OF 3 INCH POLY ALONG AMHERST DRIVE TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY 618 080.74603 (2,251) INSTALL DISTRICT REGULATOR STATION #08 ALONG HUGHES STREET IN QUANAH AND ABANDON DISTRICT REGULATOR STATION #08 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY 619 080.74604 (3,271) INSTALL DISTRICT REGULATOR STATION #13 AND 500 FEET OF 2 INCH, 45 FEET OF 4 INCH POLY ALONG MERCER STREET IN QUANAH AND ABANDON DISTRICT REGULATOR STATION #13 AND 133 FEET OF 2 INCH AND 37 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY 620 080.74606 (30,979) INSTALL DISTRICT REGULATOR STATION #01 ALONG ALBERT BROADFOOT STREET IN BONHAM AND ABANDON DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH THE RAILROAD COMMSSION TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY 621 080.74609 (3,072) INSTALL DISTRICT REGULATOR STATION #20 AND ABANDON DISTRICT REGULATOR STATION #20 IN DENISON, GRAYSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY 622 080.74610 (49,203) INSTLL 30 FEET OF 2 INCH AND 40 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #04 ALONG WEST FERN STREET AND NORTH WOODS STREET IN SHERMAN AND ABANDON DISTRICT REGULATOR STATION #04. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY 623 080.74615 (3,369) INSTALL 2550 FEET OF 4 INCH AND 135 FEET OF 2 INCH POLY ALONG THE STREETS OF DALLAS AND ABANDON 2570 FEET OF 2 INCH STEEL AND 75 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 624 080.74617 (1,696) INSTALL 870 FEET OF 4 INCH POLY ALONG SHEPHERD STREET AND ABANDON 847 FEET OF 4 INCH STEEL ADN 25 FEET OF 4 INCH POLY TO ELIMINATE UNREPAIRABLE LEAK IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY 625 080.74623 (4,534) INSTALL 1,812 FEET OF 4 INCH, 510 FEET OF 2 INCH POLY ALONG MOBERLY STREET AND ABANDON 2,282 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 626 080.74625 3,810 INSTALL 1480 FEET OF 2 INCH POLY ALONG HOMELAND STREET AND ABANDON 1285 FEET OF 2 INCH STEEL AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 627 080.74631 (658) RELOCATE FACILITIES. RELOCATE 11 SERVICE LINES IN THE CITY OF KELLER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY MTX Retirements Page 18 of 45 518 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 628 080.74633 (102) RELOCATE FACILITIES. INSTALL 501 FEET OF 4 INCH POLY AND ABANDON 501 FEET OF STEEL ALONG PEARSON LANE. INSTALL 107 FEET OF 2 INCH POLY AND ABANDON 170 FEET OF 2 INCH STEEL ALONG BOURLAND ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS KELLER SYSTEM INTEGRITY 629 080.74636 (17,448) RELOCATE FACILITIES. INSTALL 45 FEET OF 2 INCH POLY AND ABANDON 45 FEET STEEL ALONG CHANDLER ROAD. INSTALL 67 FEET OF 4 INCH POLY AND ABANDON 67 FEET OF 4 INCH STEEL ALONG SOUTH PATE ORR ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY 630 080.74642 (19,579) INSTALL 790 FEET OF 2 INCH AND 3,150 FEET OF 4 INCH POLY ALONG MEREDITH FROM SOUTH COCKRELL HILL TO SOUTH GILPIN AVENUE IN DALLAS AND ABANDON 250 FEET OF 2 INCH AND 3,700 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 631 080.74643 (1,743) INSTALL 1,000 FEET OF 2 INCH POLY ALONG PINE STREET AND ABANDON 460 FEET OF 4 INCH STEEL, AND 25 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY 632 080.74647 (15,452) INSTALL 1,790 FEET OF 2 INCH AND 635 FEET OF 4 INCH POLY AND ABANDON 1,790 FEET OF 2 INCH AND 635 FEET OF 4 INCH STEEL ALONG SOUTH GILPIN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 633 080.74648 (19,920) INSTALL 1,550 FEET OF 8 INCH POLY ALONG DAVIS STREET, INSTALL 1,295 FEET OF 2 INCH POLY ALONG CRANFORD STREET AND ABANDON 440 FEET OF 4 INCH POLY, 610 FEET OF 4 INCH, 390 FEET OF 3 INCH, 110 FEET OF 2 INCH 1,665 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY 634 080.74650 (24,533) INSTALL 1,370 FEET OF 2 INCH AND 5,055 FEET OF 4 INCH POLY AND ABANDON 54 FEET OF 1.25 INCH, 3,295 FEET OF 2 INCH, 320 FEET OF 3 INCH , AND 6,639 FEET OF 4 INCH STEEL, 915 FEET OF 4 INCH, 1,937 FEET OF 2 INCH POLY ALONG THE STREETS OF THE CITY OF GORMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORMAN SYSTEM INTEGRITY 635 080.74657 (24,033) INSTALL 1,320 FEET OF 4 INCH POLY AND ABANDONING 1,312 FEET OF 4 INCH STEEL ALONG THE ALLEY OF LAGONA AVE AND DENVER AVE IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 636 080.74664 (18,970) INSTALL 3,090 FEET OF 2 INCH POLY ALONG LARRY DRIVE ALLEY AND ABANDON 3,090 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 637 080.74665 (18,791) INSTALL 3,140 FEET OF 2 INCH POLY AND ABANDON 1,700 FEET OF 3 INCH, 1440 FEET OF 3 INCH STEEL ALONG HEALEY DRIVE ALLEY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 638 080.74666 (20,602) INSTALL 3,775 FEET OF 2 INCH POLY AND ABANDON 3,775 FEET OF 2 INCH STEEL ALONG ORLANDO COURT AND MATHER COURT IN ACCORDANCE WITH RAILROAD COMMISION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 639 080.74669 (11,636) INSTALL 2,247 FEET OF 2 INCH POLY ALONG MILBY ROAD AND ABANDON 300 FEET OF 2 INCH STEEL AND 1,855 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 640 080.74671 (11,042) INSTALL 2,853 FEET OF 2 INCH POLY ALONG JAMES STREET AND GARDEN PARK COURT AND ABANDON 1,675 FEET OF 2 INCH STEEL AND 755 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 641 080.74672 (32,845) INSTALL 3,081 FEET OF 2 INCH POLY ALONG CALES DRIVE AND ABANDON 2,650 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 642 080.74673 (9,053) INSTALL 2,518 FEET OF 2 INCH POLY ALONG PONTIAC DRIVE AND ABANDON 1,460 FEET OF 3 INCH, 535 FEET OF 4 INCH STEEL, 670 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 643 080.74674 (31,775) INSTALL 1,931 FEET OF 4 INCH AND 1,018 FEET OF 2 INCH POLY ALONG STRAIT LANE AND MIBLY ROAD AND ABANDON 1,455 FEET OF 3 INCH STEEL, AND 210 FEET OF 3 INCH, 1,140 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 644 080.74675 (35,663) INSTALL 1,469 FEET OF 4 INCH AND 877 FEET OF 2 INCH POLY ALONG CLOVER PARK DRIVE AND ABANDON 1,380 FEET OF 4 INCH, 480 FEET OF 2 INCH STEEL, 100 FEET OF 2 INCH AND 320 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 645 080.74676 (31,174) INSTALL 922 FEET OF 4 INCH AND 1,917 FEET OF 2 INCH POLY ALONG PONTIAC DRIVE AND LOMBARDY LANE IN ARLINGTON AND ABANDON 1,905 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 646 080.74677 (59,505) INSTALL 2,667 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY ALONG PECANDALE DRIVE AND WAGGONER DRIVE IN ARLINGTON AND ABANDON 2,660 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 647 080.74678 (106,235) INSTALL 2,345 FEET OF 4 INCH AND 847 FEET OF 2 INCH POLY ALONG RAVENWOD DRIVE, PONTIAC DRIVE AND WESTVIEW TERRACE IN ARLINGTON. ABANDON 2,360 FEET OF 4 INCH AND 590 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 648 080.74679 (73,459) INSTALL 1,320 FEET OF 4 INCH AND 938 FEET OF 2 INCH POLY ALONG ARTHUR DRIVE AND SHERWOOD DRIVE AND ABANDON 1,305 FEET OF 4 INCH, 520 FEET OF 3 INCH AND 115 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 649 080.74680 (31,461) INSTALL 1,598 FEET OF 4 INCH AND 1,506 FEET OF 2 INCH POLY ALONG EASY STREET, VALLEY AVE AND WESTCREST DRIVE IN ARLINGTON AND ABANDON 1,600 FEET OF 4 INCH, 1,050 FEET OF 3 INCH AND 220 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 650 080.74681 (23,106) INSTALL 2,402 FEET OF 4 INCH POLY ALONG WAGGONER DRIVE, WHITNEY LANE AND TURPIN DRIVE IN ARLINGTON AND ABANDON 2,335 FEET OF 4 INCH STEEL AND 55 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 651 080.74682 (38,223) INSTALL 1,221 FEET OF 4 INCH AND 321 FEET OF 2 INCH POLY ALONG DUNCAN COURT AND RAVENWOOD DRIVE IN ARLINGTON. ABANDON 1,140 FEET OF 4 INCH AND 320 FEET OF 2 INCH STEEL, 80 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 652 080.74684 (30,741) INSTALL 4,435 FEET OF 2 INCH POLY ALONG SOUTH RANDOLPH DRIVE AND ABANDON 4,405 FEET OF 2 INCH STEEL AND 30 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 653 080.74692 (998) RELOCATE FACILITIES. RELOCATE 147 FEET OF 2 INCH, 30 FEET OF 6 INCH POLY AND ABANDON 22 FEET OF 6 INCH POLY ALONG CALDWELLS LANE AND RUSSELL STREET IN PFLUGERVILLE, TRAVIS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS PFLUGERVILLE SYSTEM INTEGRITY 654 080.74693 (25,141) INSTALL 1,739 FEET OF 4 INCH POLY ALONG THE ALLEY OF GOULD AVENUE AND DENVER AVENUE AND ABANDON 1,341 FEET OF 4 INCH, 451 FEET OF 6 INCH STEEL IN ACCORANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 655 080.74703 23,906 INSTALL 2,800 FEET OF 8 INCH AND 30 FEET OF 4 INCH POLY AND ABANDON 2,690 FEET OF 8 INCH, 30 FEET OF 4 INCH STEEL AND 85 FEET OF 8 INCH POLY ALONG CAMP WISDOM AND BLUEWOOD ROAD IN ACCORDANCE WITH RAILROAD COMMISISON OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 656 080.74704 (22,764) INSTALL DISTRICT REGULATOR STATION #01 ALONG WEST WICHITA STREET AND COWAN STREET IN BOWIE AND ABANDON DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE SYSTEM INTEGRITY 657 080.74705 (30,763) INSTALL DISTRICT REGULATOR STATION #03 ALONG NORTH MILL STREET AND EAST NELSON STREET IN BOWIE AND ABANDON DISTRICT REGULATOR STATION #03 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE SYSTEM INTEGRITY 658 080.74706 (8,980) INSTALL DISTRICT REGULATOR STATAION #09 ALONG HIGHWAY 59 SOUTH AND US HIGHWAY 287 IN BOWIE AND ABANDON DISTRICT REGULATOR STATION #09 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE SYSTEM INTEGRITY 659 080.74709 (55,630) INSTALL 2,360 FEET OF 2 INCH AND 215 FEET OF 4 INCH POLY AND ABANDON 2,345 FEET OF 3 INCH, 215 FEET OF 4 INCH STEEL AND 15 FEET OF 3 INCH POLY ALONG THE ALLEY BETWEEN BLUEWOOD AND CLEARWOOD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 660 080.74710 (421) RELOCATE FACILITIES. INSTALL 2150 FEET OF 6 INCH AND 20 FEET OF 4 INCH POLY ALONG WEST BAILEY BOSWELL ROAD AND ABANDON 1950 FEET OF 4 INCH STEEL, 100 FEET OF 4 INCH AND 70 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES MTX Retirements Page 19 of 45 519 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 661 080.74715 (54,152) PROCEEDS FROM FY2022 VEHICLE SALES IN DALLAS. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT 662 080.74719 (78,333) INSTALL 1,450 FEET OF 4 INCH, 30 FEET OF 2 INCH AND 10 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION #02 ALONG WEST AVENUE E AND ALLEY BETWEEN 5TH AND 7TH STREET IN MIDLOTHIAN AND ABANDON 365 FEET OF 4 INCH STEEL AND 535 FEET OF 4 INCH, 770 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #02 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY 663 080.74726 (12,808) RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY ALONG MEACHAM BOULEVARD AND ABANDON 400 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISISON OF TEXAS RULE 8.209.ALL CUSTOMERS HALTOM CITY RELOCATION OF FACILITIES 664 080.74739 (6,086) INSTALL 1,175 FEET OF 4 INCH, 2,800 FEET OF 2 INCH POLY AND ABANDON 2,675 FEET OF 2 INCH STEEL ALONG SAMBROSA LANE IN ACCORDANCE WITH RAILROAD COMMISION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 665 080.74746 (13,800) INSTALL 1,400 FEET OF 8 INCH POLY AND ABANDON 1,400 OF 4 INCH POLY ALONG CHALLENGER ROAD.ALL CUSTOMERS MIDLOTHIAN SYSTEM IMPROVEMENT 666 080.74747 (20,821) INSTALL 2,214 FEET OF 2 INCH POLY ALONG CORSICANA STREET AND ABANDON 415 FEET OF STEEL, 708 FEET OF 3 INCH, 1,745 FEET OF 2 INCH STEEL AND 228 FEET OF 4 INCH, 84 FEET OF 3 INCH, 420 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 667 080.74752 2,866 RELOCATE FACILITIES. INSTALL 280 FEET OF 4 INCH AND 405 FEET OF 2 INCH POLY AND ABANDON 405 FEET OF 2 INCH AND 280 FEET OF 4 INCH STEEL ALONG SHADOW LANE TO ACCOMODATE CITY OF IRVING STORM DRAIN PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES 668 080.74753 (200,800) INSTALL 3,250 FEET OF 2 INCH POLY AND ABANDON 178 FEET OF 6 INCH, 967 FEET OF 4 INCH STEEL, AND 66 FEET OF 4 INCH, 1,014 FEET OF 2 INCH POLY ALONG CORSICANA STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 669 080.74756 (146,803) INSTALL DISTRICT REGULATOR STATION #121, 57 FEET OF 2 INCH, 30 FEET OF 4 INCH POLY ALONG EAST MORPHY STREET AND YUMA AVENUE AND ABANDON 57 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #121 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 670 080.74757 (26,893) INSTALL 1,310 FEET OF 4 INCH, 526 FEET OF 6 INCH POLY AND ABANDON 1,329 FEET OF 4 INCH STTEL, 488 FEET OF 6 INCH POLY ALONG THE ALLEY OF GOULD AVENUE AND DENVER AVENUE IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 671 080.74759 (3,474) INSTALL 2750 FEET OF 2 INCH POLY AND ABANDON 1440 FEET OF 2 INCH, 1200 FEET OF 3 INCH STEEL AND 30 FEET OF 2 INCH POLY ALONG THE STREETS OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 672 080.74762 (3,652) REPLACE 460 FEET OF 4 INCH POLY ALONG FAROLA DRIVE AND ABANDON 145 FEET OF 3 INCH STEEL.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 673 080.74771 (29) RELOCATE FACILITIES. INSTALL 570 FEET OF 2 INCH POLY ALONG THE EASEMENT OF MILLER ROAD AND ABANDON 550 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF GARLAND STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES 674 080.74773 (195,493) INSTALL 16 INCH PIG TRAP AT PLANO SOUTH STATION, INSTALL 500 FEET OF 4 INCH ON D17-4-10 AND INSTALL TWO (2) REGULATOR STATIONS AT SANDEN STATION IN WYLIE, COLLIN COUNTY.ALL CUSTOMERS WYLIE SYSTEM IMPROVEMENT 675 080.74775 (40,837) INSTALL DISTRICT REGULATOR STATION #126, 35 FEET OF 2 INCH AND 35 FEET OF 4 INCH POLY ALONG EAST ARLINGTON AVENUE AND YUMA AVENUE AND ABANDON DISTRICT REGULATOR STATION #126 AND 35 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 676 080.74776 (230,974) INSTALL 40 FEET OF 2 INCH AND 38 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #136 ALONG WEST DEVITT STREET AND RYAN AVENUE AND ABANDON 40 FEET OF 3 INCH POLY AND DISTRICT REGULATOR STATION #136 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 677 080.74778 (9,915) INSTALL 94 POLY SERVICES AND ABANDON 94 STEEL SERVICES IN WACO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 678 080.74779 (32,847) RELOCATE FACILITIES. INSTALL 1075 FEET OF 4 INCH POLY ALONG MARBLEHEAD DRIVE AND ABANDON 1050 FEET OF 6 INCH STEEL ITO ACCOMODATE CITY OF DALLAS N ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 679 080.74780 (27,598) INSTALL 30 FEET OF 2 INCH AND 40 FEET OF 4 INCH AND DISTRICT REGULATOR STATION #14 ALONG COTTAGE STREET AND AVENUE D IN BROWNWOOD AND ABANDON 40 FEET OF 4 INCH AND 5 FEET OF 6 INCH STEEL AND 5 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY 680 080.74782 (17,013) INSTALL 3,205 FEET OF 2 INCH POLY ALONG ROSEMARY AND GARFIELD IN DALLAS AND ABANDON 3,205 FEET OF 2I NCH STEE AND 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 681 080.74783 (33,728) INSTALL 50 FEET OF 2 INCH AND 30 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #36 AND ABANDON 20 FEET OF 2 INCH AND 30 FEET OF 6 INCH STEEL AT THE INTERSECTION OF 9TH AVENUE & 10TH AVENUE IN BROWNWOOD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY 682 080.74786 (2,814) RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY AND ABANDON 490 FEET OF 2 INCH POLY ALONG RIDGE ROAD WEST TO ACCOMODATE CITY OF ROCKWALL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY 683 080.74794 (24,476) INSTALL 2,640 FEET OF 2 INCH POLY ALONG GARFIELD ROAD AND PHINNEY IN DALLAS AND ABANDON 2,560 FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 684 080.74799 (20,941) INSTALL 2,930 FEET OF 2 INCH POLY ALONG OGDEN AND HIGGINS IN DALLAS AND ABANDON 2,850 FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 685 080.74807 360 RELOCATE FACILITIES. INSTALL 22 FEET OF 6 INCH POLY ALONG LAKEWOOD DRIVE AND ABANDON 20 FEET OF 6 INCH POLY TO ACCOMODATE DEVELOPER FACILITIES. ALL CUSTOMERS BURLESON RELOCATION OF FACILITIES 686 080.74808 (185) INSTALL 215 FEET OF 2 INCH POLY ALONG NORTH MAIN STREET AND ABANDON 215 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BLUE RIDGE SYSTEM INTEGRITY 687 080.74809 (2,990) INSTALL 15 FEET OF 2 INCH AND 875 FEET OF 4 INCH POLY ALONG NORTH RIKE STREET IN FARMERSVILLE AND ABANDON 5 FEET OF 1.25 INCH, 5 FEET OF 2 INCH POLY AND 1,393 FEET OF 4 INCH, 122 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY 688 080.74822 (19,279) RELOCATE FACILITIES. INSTALL 1.098 FEET OF 6 INCH POLY AND 140 FEET OF 10 INCH STEEL AND ABANDON 1,078 FEET OF 6 INCH POLY AND 205 FEET OF 8 INCH STEEL ALONG STATE HIGHWAY 66 AND DALROCK ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY 689 080.74825 (31,955) INSTALL 700 FEET OF 4 INCH POLY ALONG SPRINGLAKE PARKWAY AND ABANDON 790 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY 690 080.74828 (860) ABANDON DISTRICT REGULATOR STATION #17 AND 3 FEET OF 3 INCH AND 35 FEET OF 2 INCH POLY IN THE CITY OF COLEMAN, COLEMAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY 691 080.74830 (2,478) INSTALL 30 FEET OF 2 INCH AND 30 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #14 AT FIFTH AVENUE BETWEEN PECAN STREET AND COLLEGE STREET IN COLEMAN AND ABANDON 33 FEET OF 3 INCH AND 7FEET 4 INCH STEEL, 32 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #14 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE OF 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY 692 080.74831 (2,122) INSTALL DISTRICT STATION #23 AND 30 FEET OF 2 INCH, 30 FEET OF 4 INCH POLY IN COLEMAN COUNTY AND ABANDON DISTRICT REGULATOR STATION #23 AND 8 FEET OF 2 INCH POLY AND 12 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY 693 080.74835 (1,117) INSTALL 20 FEET OF 2 INCH AND&NBSP; DISTIRCT REGULATOR STATION #10 ALONG WEST VALLEY STREET AND SOUTH AMMERMAN AVENUE IN EASTLAND AND ABANDON 20 FEET OF 2 INCH STEEL, 5 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION #10 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND SYSTEM INTEGRITY MTX Retirements Page 20 of 45 520 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 694 080.74839 (2,358) INSTALL 30 FEET OF 2 INCH AND 30 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #8 ALONG NORTH 2ND STREET AND NORTH SANTA FE STREET IN SANTA ANNA AND ABANDON 5 FEET OF 2 INCH AND 15 FEET OF 3 INCH POLY AND 10 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION #08 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANTA ANNA SYSTEM INTEGRITY 695 080.74845 (4,657) INSTALL 1,300 FEET OF 2 INCH, 1,250 FEET OF 4 INCH POLY ALONG WALBURN COURT AND ABANDON 2,610 FEET OF 2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 696 080.74847 (16,527) INSTALL 2,390 FEET OF 2 INCH POLY ALONG NAVARRO STREET AND ABANDON 1,570 FEET OF 2 INCH, 730 FEET OF 4 INCH STEEL AND 60 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 697 080.74854 (34,423) INSTALL 1,815 FEET OF 2 INCH POLY ALONG BAYSIDE AND ABANDON 1,805 FEET OF 2 INCH STEEL AND 10 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 698 080.74861 19 RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH POLY AND ABANDON 350 FFET OF 2 INCH POLY ALONG COMMANDER ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES 699 080.74863 12,643 INSTALL 900 FEET OF 2 INCH POLY ALONG STREETS OF GODLEY AND ABANDON 900 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GODLEY SYSTEM INTEGRITY 700 080.74866 (13,224) INSTALL DISTRICT REGULATOR STATION #04 AND 75 FEET OF 2 INCH AND 30 FEET OF 4 INCH POLY ALONG DUNBAR STREET AND ABANDON 15 FEET OF 4 INCH AND 25 FEET OF 6 INCH STEEL AND DISTRICT REGULATOR STATION # 04 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY 701 080.74867 (7,569) INSTALL 70 FEET OF 2 INCH, 300 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #05 ALONG WICHITA STREET AND ABANDON 30 FEET OF 4 INCH POLY 185 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY 702 080.74868 (19,950) ABANDON DISTRICT REGULATOR STATION DRS01, 534 FEET OF 4 INCH STEEL AND 764 FEET OF 4 INCH POLY ALONG EAST WICHITA STREET IN HENRIETTA, CLAY COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY 703 080.74869 (4,633) INSTALL DISTRICT REGULATOR STATION DRS08, 40 FEET OF 2 INCH AND 180 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS08 AND 20 FEET OF 2 INCH AND 45 FEET OF 6 INCH STEEL ALONG S RED RIVER STREET IN HENRIETTA, CLAY COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY 704 080.74873 (32,121) INSTALL DISTRICT REGULATOR STATION 026 AND 30 FEET OF 2 INCH, 30 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 026 AND 48 FEET OF 2 INCH, 63 FEET OF 4 INCH STEEL AND 8 FEET OF 4 INCH POLY ALONG 11TH STREET IN WICHITA FALLS, WICHITA COUNTY.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 705 080.74874 (4,242) INSTALL DISTRICT REGULATOR STATION #09 ALONG EASTON STREET AND GEORGIA STREET IN VERNON AND ABANDON DISTRICT REGULATOR STATION #09 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY 706 080.74875 (12,671) INSTALL DISTRICT REGULATOR STATION #10 ALONG BEAVER STREET AND MAIN STREET IN VERNON AND ABANDON DISTRICT REGULATOR STATION #10 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY 707 080.74877 (21,636) INSTALL DISTRICT REGULATOR STATION #22, 45 FEET OF 2 INCH, 30 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION #22 AND 195 FEET OF 4 INCH POLY, 15 FEET OF4 INCH, AND 15 FEET OF 8 INCH STEEL ALONG BIRDWELL IN ACCORDANCE WITH RAILROAD COMMISISON OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 708 080.74879 (25,974) INSTALL DISTRICT REGULATOR STATION #103, 70 FEET OF 2 INCH AND 540 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION #103 AND 115 FEET OF 2 INCH POLY AND 15 FEET OF 6 INCH STEEL ALONG MCGRATH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 709 080.74881 (47,806) INSTALL 3,950 FEET OF 4 INCH AND 450 FEET OF 2 INCH POLY ALONG CANADA DRIVE AND ABANDON 3,790 FEET OF 4 INCH, 420 FEET OF 2 INCH STEEL, 40 FEET OF 4 INCH AND 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209..ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 710 080.74888 (36,513) INTEGRITY DIGS AND REMEDIATION ALONG LINE D IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 711 080.74889 (50,402) RELOCATE FACILITIES. INSTALL 1,575 FEET OF 8 INCH POLY ALONG HIGHWAY 290 IN MANOR AND ABANDON 1,945 FEET OF 8 INCH POLY. ALL CUSTOMERS MANOR RELOCATION OF FACILITIES 712 080.74893 (5,428) INSTALL 1,540 FEET OF 2 INCH POLY ALONG PUGET STREET AND ABANDON 1,500 FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 713 080.74898 (109,816) INSTALL 3,780 FEET OF 4 INCH AND 110 FEET OF 2 INCH POLY AND ABANDON 220 FEET OF 2 INCH. 50 FEET OF 3 INCH, 1,990 FEET OF 6 INCH AND 1,650 FEET OF 8 INCH STEEL, AND 10 FEET OF 2 INCH, 20 FEET OF 4 INCH POLY ALONG HAMPTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 714 080.74905 (30,070) INSTALL 30 FEET OF 4 INCH POLY ALONG THE NORTHWEST CORNER OF COUNTY ROAD 138 AND LITTLE LAKE ROAD AND ABANDON 126 FEET OF 2 INCH POLY ALONG NORTHWEST CORNER OF CR138 AND DANA DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION TEXAS RULE 8.209. ALL CUSTOMERS HUTTO SYSTEM INTEGRITY 715 080.74906 (10,518) RELOCATE FACILITIES. INSTALL 1738 FEET OF 4 INCH AND 262 FEET OF 2 INCH POLY AND ABANDON 1801 FEET OF 3 INCH, 142 FEET OF 2 INCH STEEL AND 173 FEET OF 2 INCH POLY ALONG BARNETT STREET TO ACCOMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY 716 080.74909 (10,181) INSTALL 2,500 FEET OF 2 INCH, 1,375 FEET OF 4 INCH POLY ALONG TITUS STREET AND ABANDON 375 FEET OF 4 INCH POLY AND 3,500 FEET OF 6 INCH STEEL AND DISTRICT REGULATOR STATION #28 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209..ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 717 080.74913 (427) RELOCATE FACILITIES. INSTALL 20 FEET OF 4 INCH POLY ALONG PUTNAM DRIVE AND ABANDON 6 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY 718 080.74924 (464) INSTALL 225 FEET OF 2 INCH POLY ALONG AINSWORTH AND ABANDON 245 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 719 080.74925 (3,898) INSTALL 2,792 FEET OF 2 INCH POLY ALONG ERATH STREET AND NORTH 44TH STREET IN WACO AND ABANDON 2,562 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 720 080.74930 (14,414) RELOCATE FACILITIES. INSTALL 150 FEET OF 8 INCH AND 150 FEET OF 8 INCH POLY ALONG NW 22ND STREET AND ABANDON 275 FEET OF 8 INCH AND 75 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF FORTH WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 721 080.74937 1,064 INSTALL 2950 FEET OF 8 INCH POLY ALONG STREETS OF BALCH SPRINGS AND ABANDON 2953 FEET OF 8 INCH STEEL AND 10 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALCH SPRINGS SYSTEM INTEGRITY 722 080.74939 (2,910) ABANDON 715 FEET OF 2 INCH POLY AND 450 FEET OF 4 INCH STEEL ALONG SCOTT STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY 723 080.74946 (32) INSTALL 100 FEET OF 4 INCH POLY ALONG EAST MAIN STREET. COMMERCIAL OR INDUSTRIAL EASTLAND GROWTH 724 080.74956 (4,543) RELOCATE FACILITIES. INSTALL 250 FEET OF 6 INCH STEEL AND ABANDON 250 FEET OF 6 INCH STEEL ALONG INTERSECTION OF TEXAS AVE AND FM 2818 TO ACCOMODATE NEW BUILDING.ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES 725 080.74958 (3,106) INSTALL 100 FEET OF 8 INCH STEEL ALONG WILLIAMS DRIVE IN GEORGETOWN AND ABANDON 100 FEET OF 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY 726 080.74979 (7,163) RELOCATE FACILITIES. INSTALL 150 FEET OF 6 INCH POLY ALONG WESTPORT PARKWAY AND ABANDON 150 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES 727 080.74980 (849) INSTALL 450 FEET OF 6 INCH POLY ALONG CHERRY AND ABANDON 450 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY MTX Retirements Page 21 of 45 521 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 728 080.74981 (24,681) INSTALL 3,740 FEET OF 2 INCH POLY AND ABANDON 3,295 FEET OF 3 INCH AND 55 FEET OF 6 INCH STEEL NEAR THE INTERSECTION OF CHANNEL AND BROCKBANK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 729 080.74983 (7,283) INSTALL 1,500 FEET OF 2 INCH POLY AND ABANDON 1,500 FEET OF 2 INCH STEEL ALONG THE STREETS OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 730 080.74984 (32,387) INSTALL 2,670 FEET OF 2 INCH POLY AND ABANDON 2,240 FEET OF 2 INCH, 165 FEET OF 4 INCH, AND 10 FEET OF 8 INCH STEEL AND 165 FEET OF 4 INCH POLY ALONG WEBBS CHAPPLE IN ACCORDANCE WITH THE RAILROAD COMMISSON OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 731 080.74985 (4,628) INSTALL DISTRICT REGULATOR STATION #01 ALVORD STREET AND EAST CURTIS STREET IN QUANAH AND ABANDON DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY 732 080.74986 347 RELOCATE FACILITIES. INSTALL 550 FEET OF 4 INCH POLY AND ABANDON 550 FT OF 3 IN STEEL TO ACCOMODATE CITY OF DALLAS STREETS PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 733 080.74988 (2,703) RELOCATE FACILITIES. INSTALL 22 .75 INCH POLY SERVICE LINES ALONG ALAMO STREET BETWEEN GOLIAD STREET AND HEATH STREET IN ROCKWALL AND ABANDON 22 .75 INCH POLY SERVICE LINES TO ACCOMMODATE THE CITY OF ROCKWALL IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY 734 080.74993 (33,351) INSTALL 3,990 FEET OF 2 INCH POLY ALONG BELKNOLL AND SEYMOUR IN DALLAS AND ABANDON 90 FEET OF 2 INCH POLY AND 3,675 FEET OF 3 INCH AND 230 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 735 080.74996 (17,520) INSTALL 2,400 FEET OF 2 INCH POLY AND ABANDON 278 FEET OF 2 INCH, 589 FEET OF 3 INCH STEEL AND 161 FEET OF 2 INCH, 1,355 FEET OF 4 INCH POLY ALONG SUNSET, ANNA AND BOLIVAR STREET IN ACCORDANCE TO THE TEXAS RAILROAD COMMISSION RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY 736 080.75025 (4,546) INSTALL 2,750 FEET OF 2 INCH POLY AND ABANDON 2,700 FEET OF 2 INCH STEEL ALONG RADSTOCK STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 737 080.75029 1,480 RELOCATE FACILITIES. INSTALL 990 FEET OF 2 INCH POLY ALONG GLENDORA AND ABANDON 990 FEET OF 2 INCH STEEL TO ACCOMODATE CITY OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 738 080.75032 (7,398) INSTALL 2,600 FEET OF 4 INCH ALONG WRIGLEY WAY IN FORT WORTH AND ABANDON 2,500 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 739 080.75041 233 INSTALL 465 FEET OF 4 INCH POLY AND ABANDON 425 FEET OF 4 INCH STEEL ALONG STREETS OF CLEBURNE.ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY 740 080.75048 (41,957) INSTALL 1,293 FEET OF 4 INCH, 500 FEET OF 6 INCH POLY ALONG DENVER AVE AND LAGONDA AVENUE IN FORT WORTH AND ABANDON 1,273 FEET OF 4 INCH , 70 FEET OF 6 INCH STEEL, AND 431 FEET OF 6 INCH AND 219 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 741 080.75054 (661) INSTALL 700 FEET OF 4 INCH POLY ALONG CYPRESS AND ABANDON 700 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY 742 080.75058 (44,838) INSTALL 3,120 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY ALONG RUSTOWN AND OATS IN DALLAS AND ABANDON 2,630 FEET OF 8 INCH, 1,365 FEET OF 6 INCH, 275 FEET OF 3 INCH AND 15 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 743 080.75059 (20,049) INSTALL 2,400 FEET OF 2 INCH POLY AND ABANDON 2,390 FEET OF 3 INCH STEEL ALONG THE STREETS OF RUSTOWN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 744 080.75066 36 RELOCATE FACILITIES. INSTALL 131 FEET OF 2 INCH POLY ALONG WESTBOROUGH LANE AND ABANDON 125 FEET OF 2 INCH POLY TO ACCOMODATE DEVELOPER FACILITIES. ALL CUSTOMERS LEANDER RELOCATION OF FACILITIES 745 080.75067 (1,439) ABANDON 570 FEET OF 3 INCH STEEL ALONG SOUTH OAKES STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY 746 080.75068 (6,136) INSTALL 1,650 FEET OF 2 INCH POLY ALONG WHITMAN AVENUE IN FORT WORTH AND ABANDON 1,600 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 747 080.75069 (22,464) INSTALL 2,025 FEET OF 2 INCH, 315 FEET OF 4 INCH POLY ALONG NORTH LUMPKIN STREET WITHIN THE CITY OF MART AND ABANDON 10 FEET OF 4 INCH, 15 FEET OF 3 INCH POLY AND 950 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS MART SYSTEM INTEGRITY 748 080.75071 (8,724) INSTALL 360 FEET OF 4 INCH, 1,750 FEET OF 2 INCH POLY AND ABANDON 1,370 FEET OF 3 INCH STEEL AND 420 FEET OF 4 INCH POLY ALONG MCLLENAN AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY 749 080.75072 (39,399) INSTALL 2,495 FEET OF 2 INCH AND 700 FEET OF 4 INCH POLY NEAR THE INTERSECTION OF GROSS AND PIPER AND ABANDON 820 FEET OF 6 INCH AND 3,000 FEET OF 3 INCH STEEL AND 30 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 750 080.75073 (8,492) INSTALL 2,127 FEET OF 4 INCH POLY AND ABANDON 2,138 FEET OF 3 INCH, 20 FEET OF 4 INCH POLY ALONG TEXAS AVENUE AND NORTH COUNTY LINE ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY 751 080.75074 (19,500) INSTALL 20 FEET OF 2 INCH AND 3,310 FEET OF 4 INCH POLY NEAR THE INTERSECTION OF GROSS AND SORRENTO IN DALLAS AND ABANDON 1,295 FEET OF 6 INCH, 1,070 FEET OF 3 INCH, 15 FEET OF 2 INCH, AND 955 FEET OF 1.25 INCH STEEL AND 10 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 752 080.75077 (68,217) INSTALL DISTRICT REGULATOR STATION #22 AND 165 FEET OF 4 INCH STEEL ALONG 4TH STREET AND FORREST AVENUE AND ABANDON DISTRICT REGULATOR STATION #22 AND 160 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY 753 080.75078 (17,887) INSTALL 10 FEET OF 4 INCH AND 620 FEET OF 6 INCH POLY ALONG GOODWIN AND ABANDON 600 FEET OF 10 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 754 080.75083 (37,518) RELOCATE FACILITIES. INSTALL 3,600 FEET OF 2 INCH, 450 FEET OF 4 INCH POLY AND ABANDON 3,600 FEET OF 2 INCH AND 450 FEET OF 4 INCH POLY ALONG ELMCREST AND LARRAINE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY 755 080.75084 (290,026) INSTALL 4 MILES OF 6 INCH STEEL FROM P(2ND)/L26 JUNCTION TO LOTT DISTRICT REGULATOR STATION SOUTH OF HWY 320 AND ABANDON 4 MILES OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LOTT SYSTEM INTEGRITY 756 080.75091 (2,587) INSTALL 2,000 FEET OF 4 INCH, 450 FEET OF 2 INCH POLY ALONG WEST HOPKINGS STREET AND ABANDON 2,550 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY 757 080.75098 312 RELOCATE FACILITIES. INSTALL 120 FEET OF 4 INCH POLY AND ABANDON 120 FEET OF 4 INCH POLY ALONG KARNES STREET TO ACCOMODATE CITY OF FLOWERMOUND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND RELOCATION OF FACILITIES 758 080.75112 2,803 INSTALL 275 FEET OF 2 INCH POLY AND ABANDON 358 FEET OF 10 INCH STEEL ALONG 10TH STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 759 080.75115 (2,671) INSTALL 75 FEET OF 4 INCH POLY ALONG HORNE STREET, 450 FEET OF 2 INCH POLY ALONG CARVER DRIVE AND ABANDON 450 FEET OF 3 INCH STEEL AND 30 FEET OF 4 INCH POLY DUE TO CITY CONFLICT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209..ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 760 080.75124 (10,770) RELOCATE FACILITIES. INSTALL 1,180 FEET OF 2 INCH POLY ALONG CHERRY STREET AND EAST CENTER STREET IN DUNCANVILLE AND ABANDON 107 FEET OF 1.25 INCH, 507 FEET OF 2 INCH STEEL AND 450 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY 761 080.75132 (273) RELOCATE FACILITIES. INSTALL 300 FEET OF 6 INCH POLY ALONG MAIN STREET AND ABANDON 300 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF CROWLEY STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY RELOCATION OF FACILITIES MTX Retirements Page 22 of 45 522 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 762 080.75133 (54,180) INSTALL 1,121 FEET OF 2 INCH, 930 FEET OF 4 INCH POLY AND ABANDON 280 FEET OF 3 INCH, 890 FEET, 175 FEET OF 6 INCH STEEL AND 615 FEET OF OF 4 INCH, 305 FEET OF 6 INCH POLY ALONG NORTH WACO STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 763 080.75146 (44,840) INSTALL 3,520 FEET OF 2 INCH POLY ALONG HEALEY DRIVE ALLEY AND ABANDON 1,950 FEET OF 3 INCH, 1,560 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 764 080.75147 (120,192) INSTALL 2,960 FEET OF 2 INCH POLY AND ABANDON 2,860 FEET OF 3 INCH STEEL, 100 FEET OF 4 INCH POLY ALONG HILLGLENN ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 765 080.75152 (5,015) INSTALL 350 FEET OF 2 INCH POLY ALONG KNOLL TRAIL IN DALLAS AND ABANDON 700 FEET OF 2 INCH POLY.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 766 080.75159 (53,593) INSTALL 3,630 FEET OF 2 INCH POLY ALONG MILMAR DRIVE ALLEY AND ABANDON 3,530 FEET OF 3 INCH STEEL AND 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 767 080.75160 (34,326) INSTALL 1,350 FEET OF 2 INCH POLY ALONG MARLIN DRIVE ALLEY AND ABANDON 1,350 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209..ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 768 080.75161 (50,387) INSTALL 4,260 FEET OF 2 INCH POLY AND ABANDON 3,050 FEET OF 6 INCH, 1,210 FEET OF 3 INCH STEEL ALONG CRET RIDGE DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 769 080.75162 (4,099) INSTALL 200 FEET OF 4 INCH POLY AND ABANDON 130 FEET OF 4 INCH POLY ALONG THE STREETS OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 770 080.75170 (51,213) INSTALL DISTRICT REGULATOR STATION #301 AND 5 FEET OF 2 INCH, 5 FEET OF 4 INCH POLY ALONG THE STREET OF WESTBROOK IN THE CITY OF FORT WORTH AND ABANDON DISCTRICT REGULATOR STATION #301 AND 5 FEET OF 2 INCH STEEL, 5 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 771 080.75171 (24,358) INSTALL DISTRICT REGULATOR STATION #307 , 5 FEET OF 2INCH POLY, 5 FEET OF 4 INCH POLY ALONG THE STREET OF MURPHY STREET IN THE CITY OF FORT WORTH AND ABANDON DISTRICT REGULATOR STATION #307 AND 5 FEET OF 6 INCH, 5 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 772 080.75174 (24,631) INSTALL DISTRICT REGULATOR STATION #403, 5 FEET OF 2 INCH, 5 FEET OF 4 INCH POLY ALONG PUTNAM STREET AND ABANDON DISTRICT REGULATOR STATION #403, 5 FEET OF 4 INCH, 5 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 773 080.75175 (17,646) INSTALL DISTRICT REGULATOR STATION #405 AND ABANDON DISTRICT REGULATOR STATION #405 AT THE INTERSECTION OF CAMILLIA AND PARKDALE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 774 080.75184 (6,331) INSTALL 1,575 FEET OF 2 INCH AND 375 FEET OF 4 INCH POLY ALONG WACO WAY IN FORT WORTH AND ABANDON 1,950 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 775 080.75188 (9,162) INSTALL 2,500 FEET OF 2 INCH POLY AND ABANDON 2,450 FEET OF 2 INCH STEEL ALONG MARTIN LUTHER KING SOUTH. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY 776 080.75190 (15,347) INSTALL 1,100 FEET OF 2 INCH POLY AND ABANDON 850 FEET OF 4 INCH STEEL AND 25 FEET OF 4 INCH POLY ALONG THE ALLEY EAST OF BROOK TP SPEEDWAY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 777 080.75195 (23,823) INSTALL DISTRICT REGULATOR STATION #138, 28 FEET OF 2 INCH, 30 FEET OF 4 INCH POLY ALONG THE INTERSECTION OF ALICE STREET AND WEST BIDDISON STREET AND ABANDON DISTRICT REGULATOR STATION #138 AND 28 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 778 080.75196 (44,852) INSTALL DISTRICT REGULATOR STATION #139 AND 45 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY ALONG INTERSECTION OF TRAVIS AVENUE AND WEST RIPY STREET AND ABANDON DISTRICT REGULATOR STATION #139 AND 45 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 779 080.75198 (66,817) INSTALL DISTRICT REGULATOR STATION #140 AND 30 FEET OF 2 INCH, 20 FEET OF 4 INCH POLY ALONG THE INTERSECTION OF HEMPHILL STREET AND WEST MALTA AND ABANDON DISTRICT REGULATOR STATION #140 AND 30 FEET OF 12 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 780 080.75199 (46,801) INSTALL DISTRICT REGULATOR STATION #144 AND 20 FEET OF 2 INCH, 30 FEET OF 4 INCH POLY AT THE INTERSECTION OF ALL SAINTS AVENUE AND MISTLETOE BOULEVARD AND ABANDON DISTRICT REGULATOR STATION #144 AND 20 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 781 080.75200 (3,254) INSTALL DISTRICT REGULATOR STATION #02 IN THE ALLEY BETWEEN AVENUE A AND AVENUE B IN ROSEBUD AND ABANDON DISTRICT REGULATOR STATION #02 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSEBUD SYSTEM INTEGRITY 782 080.75202 (13,385) ABANDON DISTRICT REGULATOR STATION #03 ALONG EAST MAIN STREET IN ROSEBUD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSEBUD SYSTEM INTEGRITY 783 080.75203 (72,606) INSTALL DISTRICT REGULATOR STATION #01, 40 FEET OF 4 INCH POLY AT THE INTERSECTION OF SOUTH COLLEGE DRIVE AND 2ND STREET AND ABANDON DISTRICT REGULATOR STATION #01 AND 40 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEENE SYSTEM INTEGRITY 784 080.75210 (37,981) INSTALL DISTRICT REGULATOR STATION #05 AND 20 FEET OF 2 INCH AND 20 FEET OF 4 INCH STEEL AT THE INTERSECTION OF SPRUCE STREET AND EAST 4TH STREET AND ABANDON DISTRICT REGULATOR STATION #05 AND 40 FEET OF 2 INCH AND 40 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEENE SYSTEM INTEGRITY 785 080.75211 (67,344) INSTALL DISTRICT REGULATOR STATION #502 AND 5 FEET OF 2 INCH AND 5 FEET OF 4 INCH POLY AT THE INTERSECTION OF CAMP BOWIE BOULEVARD AND CLIFTON STREET AND ABANDON DISTRICT REGULATOR STATION #502 AND 5 FEET OF 4 INCH STEEL AND 5 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 786 080.75214 (24,672) INSTALL DISTRICT REGULATOR STATION #504 AND 5 FEET OF 2 INCH AND 5 FEET OF 4 INCH POLY AT THE INTERSECTION OF HARLEY AVENUE AND HULEN STREET AND ABANDON DISTRICT REGULATOR STATION #504 AND 5 FEET OF 6 INCH STEEL AND 5 FEET OF 8 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 787 080.75215 (55,260) INSTALL DISTRICT REGULATOR STATION #505 AND 5 FEET OF 2 INCH AND 5 FEET OF 4 INCH POLY AT THE INTERSECTION OF EL CAMPO AVENUE AND MERRICK STREET AND ABANDON DISTRICT REGULATOR STATION #505 AND 5 FEET OF 4 INCH AND 5 FEET OF 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 788 080.75216 (31,334) INSTALL DISTRICT REGULATOR STATION #06 AND 40 FEET OF 4 INCH STEEL AT THE INTERSECTION OF FM 2280 AND WEST HILLCREST AVENUE AND ABANDON DISTRICT REGULATOR STATION #06 AND 40 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEENE SYSTEM INTEGRITY 789 080.75219 (30,393) INSTALL 1,350 FEET OF 2 INCH POLY ALONG THE STREETS OF BRIDWELL AT 23RD STREET AND ABANDON 1,484 FEET OF 2 INCH STEEL AND 129 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 790 080.75221 3,213 INSTALL DISTRICT REGULATOR STATION #01 AND 20 FEET OF 2 INCH, 20 FEET OF 4 INCH POLY AT THE INTERSECTION OF ANDERSON STREET AND BELONT STREET AND ABANDON DISTRICT REGULATOR STATION #01 AND 20 FEET OF 2 INCH AND 20 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY 791 080.75227 (79,164) INSTALL DISTRICT REGULATOR STATION #314 AND 20 FEET OF 2 INCH, 60 FEET OF 4 INCH POLY AT THE INTERSECTION OF PARRISH RD AND OAK KNOLL DRIVE AND ABANDON DISTRICT REGULATOR STATION #314 AND 20 FEET OF 2 INCH, 60 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY MTX Retirements Page 23 of 45 523 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 792 080.75228 (1,000,607) RELOCATE FACILITIES. INSTALL 1,650 FEET OF 12 INCH AND 140 FEET OF 12 INCH AND 140 FEET OF 2 INCH POLY ALONG TIERNEY ROAD IN FORT WORTH AND ABANDON 1,650 FEET OF 16 INCH STEEL AND 140 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 793 080.75236 (5,439) INSTALL DISTRICT REGULATOR STATION #01, 40 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY AT THE INTERSECTION OF PARK STREET AND COLLEGE STREET AND ABANDON DISTRICT REGULATOR STATION #01 AND 40 FEET OF 4 INCH, 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ITALY SYSTEM INTEGRITY 794 080.75239 (14,611) INSTALL DISTRICT REGULATOR STATION #509 AND 20 FEET OF 4 INCH, 20 FEET OF 2 INCH POLY AT THE INTERSECTION OF FARON STREET AND COLLINWOOD AVENUE AND ABANDON DISTRICT REGULATOR STATION #509 40 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 795 080.75243 (36,787) INSTALL DISTRICT REGULATOR STATION #521 AND 20 FEET OF 2 INCH, 20 FEET OF 6 INCH POLY AT THE INTERSECTION OF WILDWOOD DRIVE AND NORTH BAILEY AVENUE AND ABANDON DISTRICT REGULATOR STATION #521 AND 40 FEET OF 3 INCH AND 40 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 796 080.75251 175,960 INSTALL DISTRICT REGULATOR STATION #02 AND 40 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY ALONG 2ND STREET AND ABANDON DISTRICT REGULATOR STATION #02 AND 40 FEET OF 4 INCH, 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY 797 080.75256 (46,493) INSTALL DISTRICT REGULATOR STATION #05 AND 40 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY AT THE INTERSECTION OF WEST 6TH STREET AND ELM STREET AND ABANDON DISTRICT REGULATOR STATION #05 AND 40 FEET OF 4 INCH AND 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY 798 080.75259 (61,531) INSTALL 1,965 FEET OF 4 INCH, 2,300 FEET OF 2 INCH POLY NEAR THE INTERSECTION OF CREST RIDGE AND SHILOH IN DALLAS AND ABANDON 500 FEET OF 8 INCH, 1,535 FEET OF 4 INCH AND 2,275 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 799 080.75260 (1,130) INSTALL 150 FEET OF 2 INCH POLY AND ABANDON 150 FEET OF 2 INCH STEEL ALONG MCCURDY STREET AND ABANDON 150 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY SYSTEM INTEGRITY 800 080.75261 (34,445) INSTALL 640 FEET OF 4 INCH, 3,695 FEET OF 2 INCH POLY NEAR THE INTERSECTION OF MATTERHORN AND SAN LUCAS AND ABANDON 2,335 FEET OF 4 INCH, 2025 FEET OF 3 INCH, AND 150 FEET OF 2 INCH STEEL AND 20 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 801 080.75263 (4,329) RELOCATE FACILITIES. INSTALL 755 FEET OF 2 INCH POLY AND ABANDONING 755 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 802 080.75276 (43,675) INSTALL 640 FEET OF 4 INCH AND 2,795 FEET OF 2 INCH POLY ALONG THE ALLEY NORTH AND SOUTH OF SAN PAULA FROM MATTERHORN TO THE WEST IN DALLAS AND ABANDON 640 FEET OF 8 INCH, 2,795 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 803 080.75278 (11,468) INSTALL 2,417 FEET OF 2 INCH POLY ALONG ROBINSON AVENUE AND LAMAR STREET AND 321 FEET OF 4 INCH POLY ALONG MYRTA STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY 804 080.75279 (13,478) INSTALL 2,768 FEET OF 2 INCH POLY ALONG WASHINGTON STREET AND MYRTA STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY 805 080.75280 (22,986) INSTALL 320 FEET OF 4 INCH AND 2,300 FEET OF 2 INCH POLY NEAR THE INTERSECTION OF SAN VINCENT AND MATTERHORN IN DALLAS AND ABANDON 1,625 FEET OF 4 INCH, 995 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 806 080.75281 (17,065) INSTALL 1,283 FEET OF 4 INCH POLY ALONG EARL GARRETT STREET AND HILLCREST AVENUE AND 1,342 FEET OF 2 INCH POLY ALONG MYRTA STREET AND ABANDON 1,165 FEET OF 3 INCH, 100 FEET FO 2 INCH STEEL AND 420 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY 807 080.75287 (828) ABANDON 376 FEET OF 2 INCH POLY ALONG CALHOUN STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 808 080.75301 (19,839) INSTALL 80 FEET OF 2 INCH, 1,580 FEET OF 4 INCH POLY ALONG MCLENNAN AVENUE AND ABANDON 165 FEET OF 6 INCH, 2,715 FEET OF 4 INCH, 25 FEET OF 3 INCH, AND 30 FEET OF 2 INCH STEEL AND 865 FEET OF 4 INCH, 15 FEET OF 3 INCH, AND 30 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS MART SYSTEM INTEGRITY 809 080.75313 (3,317) INSTALL 1,100 FEET OF 4 INCH POLY AND ABANDON 1,100 FEET OF 2 INCH POLY ALONG OLD DENTON ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS CARROLLTON SYSTEM IMPROVEMENT 810 080.75314 (4,089) INSTALL 3,200 FEET OF 4 INCH POLY ALONG WEDGEMONT CIRCLE NORTH IN FORT WORTH AND ABANDON 600 FEET OF 4 INCH POLY AND 2,600 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 811 080.75315 (7,203) REPLACE DISTRICT REGULATOR STATION #11 AND 40 FEET OF 2 INCH AND 40 FEET OF 4 INCH POLY ALONG HALL STREET AND ABANDON DISTRICT REGULATOR STATION #11 AND 40 FEET OF 4 INCH, 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY 812 080.75321 (69,392) INSTALL DISTRICT REGULATOR STATION #01, 40 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY ALONG COMMERCE STREET AND MAIN STREET AND ABANDON DISTRICT REGULATOR STATION #01 AND 40 FEET OF 4 INCH, 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MAYPEARL SYSTEM INTEGRITY 813 080.75327 (53,477) INSTALL 8 INCH MAIN LINE VALVE ASSEMBLY AFTER S20 AND S20-1 IN LANCASTER AND ABANDON 2 INCH DISTRICT REGULATOR STATION AT S20 TO O1-1. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY 814 080.75328 (1,968) INSTALL 475 FEET OF 6 INCH POLY ALONG CRAIK STREET AND ABANDON 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY 815 080.75341 (24,153) INSTALL 720 FEET OF 2 INCH POLY ALONG RUSH STREET AND ABANDON 720 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY 816 080.75342 (15,577) INSTALL 2,030 FEET OF 2 INCH POLY ALONG HADLEY AND BRYAN STREET AND ABANDON 2,421 FEET OF 2 INCH, 171 FEET OF 4 INCH POLY AND 270 FEET OF 2 INCH, 1,708 FEET OF 4 INCH, 14 FEET OF 2 INCH STEEL, IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY 817 080.75343 (7,509) INSTALL 630 FEET OF 4 INCH POLY ALONG FERNDALE DRIVE AND ABANDON 630 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY 818 080.75354 (7,614) INSTALL 1,400 FEET OF 4 INCH POLY ALONG BRYANT STREET AND ABANDON 1,400 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY 819 080.75356 (16,999) INSTALL 2,700 FEET OF 4 INCH POLY ALONG LLANO AVENUE AND ABANDON 2,700 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY 820 080.75360 (1,032) ABANDON 330 FEET OF 2 INCH AND 15 FEET OF 4 INCH POLY ALONG MAIN STREET IN FRISCO.ALL CUSTOMERS FRISCO SYSTEM INTEGRITY 821 080.75367 (5,293) INSTALL DISTRICT REGULATOR STATION #15 ALONG THE STREETS OF CISCO AND ABANDON DISTRICT REGULATOR STATION #15 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY 822 080.75368 (20,510) INSTALL 202 FEET OF 2 INCH, 1,285 FEET OF 4 INCH, 926 FEET OF 6 INCH POLY ALONG NORTH CHURCH STREET AND WILLIAMSON STREET AND ABANDON 590 FEET OF 2 INCH STEEL, 642 FEET OF 2 INCH, 62 FEET OF 3 INCH, 330 FEET OF 4 INCH POLY AND 1,060 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 823 080.75379 (10,775) INSTALL 1,300 FEET OF 4 INCH, 950 FEET OF 2 INCH POLY ALONG NORTH KOLLMAN ROAD AND ABANDON 2,150 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY 824 080.75380 (1,263) INSTALL DISTRICT REGULATOR STATION #05 ALONG WEST DOYLE IN GRANBURY AND ABANDON DISTRICT REGULATOR STATION #05 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY MTX Retirements Page 24 of 45 524 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 825 080.75381 (16,602) INSTALL DISTRICT REGULATOR STATIONS #06 & #08 AND 60 FEET OF 2 INCH, 90 FEET OF 4 INCH POLY ALONG NORTH BROWN STREET AND SOUTH PRICE STREET IN HAMILTON AND ABANDON 33 FEET OF 3 INCH, 3 FEET OF 4 INCH STEEL AND 190 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATIONS #06 & #08 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HAMILTON SYSTEM INTEGRITY 826 080.75383 (31,191) INSTALL DISTRICT REGULATOR STATION #03 ALONG WEST FREY STREET IN STEPHENVILLE AND 30 FEET OF 2 INCH, 70 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION #03 AND 36 FEET OF 1.25 INCH, 136 FEET OF 2 INCH, AND 20 FEET OF 4 INCH POLY AND 595 FEET OF 2 INCH AND 53 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY 827 080.75384 (629) RELOCATE FACILITIES. INSTALL 240 FEET OF 2 INCH POLY ALONG STACY ROAD AND ABANDON 230 FEET OF 2 INCH POLY. ALL CUSTOMERS FAIRVIEW RELOCATION OF FACILITIES 828 080.75392 (94,426) INSTALL 32 RECTIFIER RING MAIN UNITS (RMUS) DUE TO 3G SUNSET IN ROUND ROCK. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY 829 080.75398 (43,735) INSTALL 150 FEET OF 6 INCH AND 1,300 FEET OF 2 INCH POLY ALONG THE STREETS OF BRITTANY LANE AND ABANDON 150 FEET OF 6 INCH AND 1,258 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 830 080.75399 (6,379) INSTALL TWO (2) DISTRICT REGULATOR STATIONS, 20 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY. ABANDON DISTRICT REGULATOR STATIONS FARMERSVILLE DRS06 ALONG BOIS D' ARC AVE AND HILL STREET AND FARMERSVILLE DRS07 AT COLLEGE STREET AND N. RIKE STREET AND 7 FEET OF 2 INCH, 10 FEET OF 6 INCH POLY AND 47 FEET OF 4 INCH, 2 FEET OF 6 INCH STEEL IN FARMERSVILLE, COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY 831 080.75400 (38,132) INSTALL 1,700 FEET OF 6 INCH AND 1,200 FEET OF 2 INCH POLY ALONG THE STREETS OF DAVIS DRIVE AND ST. MARIA COURT IN ARLINGTON AND ABANDON 1,665 FEET OF 6 INCH AND 1,176 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 832 080.75402 (18,668) INSTALL 2,400 FEET OF 2 INCH POLY ALONG THE STREET OF ACADEMY DRIVE IN ARLINGTON AND ABANDON 55 FEET OF 4 INCH, 1,191 FEET OF 2 INCH AND 1,138 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 833 080.75404 (14,133) INSTALL 3,350 FEET OF 4 INCH POLY ALONG SUMMIT AVENUE IN ARLINGTON AND ABANDON 3,165 FEET OF 4 INCH STEEL AND 140 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 834 080.75408 (7,247) INSTALL 2,900 FEET OF 2 INCH POLY AND ABANDON 2,192 FEET OF 2 INCH AND 319 FEET OF 2 INCH STEEL ALONG SHADY LANE AND W. 4TH ARLINGTON, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 835 080.75409 (19,868) INSTALL 2,500 FEET OF 2 INCH POLY AND ABANDON 1,671 FEET OF 2 INCH STEEL AND 677 FEET OF 2 INCH POLY ALONG VARSITY CIRCLE IN ARLINGTON, TARRANT COUNTY, IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 836 080.75411 (62,434) INSTALL 1,710 FEET OF 2 INCH ALONG 9TH AND BEVERLY STREET AND ABANDON 2,332 FEET OF STEEL AND 653 FEET OF POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 837 080.75413 (24,246) INSTALL 1,745 FEET OF 2 INCH POLY ALONG HAYES AND SEYMOUR ROAD IN WICHITA FALLS AND ABANDON 14 FEET OF 1.25 INCH AND 171 FEET OF 4 INCH POLY AND 1,747 FEET OF 4 INCH, 130 FEET OF 1.25 INCHAND 58 FEET OF 2INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 838 080.75421 (5,920) RELOCATE FACILITIES. INSTALL 161 FEET OF 6 INCH POLY AND ABANDON 100 FEET OF 6 INCH POLY ALONG THE STREETS OF NORTHLAKE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTHLAKE SYSTEM INTEGRITY 839 080.75440 (389) INSTALL 450 FEET OF 4 INCH POLY ALONG NORTH 12TH AND MULBERRY AND ABANDON 100 FEET OF 4 INCH CAST IRON AND 350 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 840 080.75447 (2,138) INSTALL MONITOR REGULATOR IN DISTRICT REGULATOR STATION #06 ALONG WOOD STREET IN GRAPEVINE AND AND ABANDON MONITOR REGULATOR IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY 841 080.75454 (1,494) INSTALL 240 FEET OF 4 INCH POLY ALONG THE STREETS OF SANGER AND ABANDON 210 FEET OF 4 INCH STEEL AND 45 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER SYSTEM INTEGRITY 842 080.75459 (11,425) RELOCATE FACILITIES. INSTALL 2,500 FEET OF 4 INCH, 70 FEET OF 2 INCH POLY ALONG LONG STREET IN STEPHENVILLE AND ABANDON 13 FEET OF 2 INCH, 77 FEET OF 4 INCH, 134 FEET OF 3 INCH POLY, 190 OF 2 INCH, 1,693 FEET OF 4 INCH, 1,515 FEET OF 2 INCH. 416 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF STEPHENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY 843 080.75461 (2,152) RELOCATE FACILITIES. INSTALL 180 FEET OF 4 INCH POLY AND ABANDON 253 FEET OF 2 INCH STEEL ALONG 6TH STREET TO ACCOMMODATE NEW HOTEL. ALL CUSTOMERS WACO RELOCATION OF FACILITIES 844 080.75464 (81,318) INSTALL DISTRICT REGULATOR STATION #19 AND 70 FEET OF 4 INCH POLY ALONG BUFFALO STREET AND ABANDON DISTRICT REGULATOR STATION #19 AND 70 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY 845 080.75465 (38,138) INSTALL DISTRICT REGULATOR STATION #20 AND 85 FEET OF 6 INCH ALONG THE INTERSECTION OF CLAUDE AND MAIN STREET AND ABANDON DISTRICT REGULATOR STATION #20 AND 85 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY 846 080.75466 (22,524) INSTALL DISTRCT REGULATOR STATION DRS01 ALONG S. BUTLER DRIVE AND W. MAIN STREET AND DRS02 ALONG N. BONHAM DRIVE AND W. COATS DRIVE, 22 FEET OF 2 INCH AND 22 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS01 AND DRS02 AND 6 FEET OF 2INCH, 9 FEET OF 3 INCH POLY AND 6 FEET OF 4 INCH STEEL IN ALLEN, COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ALLEN SYSTEM INTEGRITY 847 080.75473 (6,050) INSTALL 235 FEET OF 4 INCH POLY AND ABANDON 200 FEET OF 4 INCH POLY ALONG EAST ELDORADO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY 848 080.75485 (857) INSTALL DISTRICT REGULATOR STATION #08 AND 40 FEET OF 2 INCH, 40 FEET OF 4 INCH ALONG WEST AVENUE C AND ABANDON DISTRICT REGULATOR STATION #08 AND 40 FEET OF 3 INCH, 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY 849 080.75486 (2,083) INSALL 1,163 FEET OF 2 INCH, 688 FEET OF 4 INCH POLY AND ABANDON 1,740 FEET OF 2 INCH STEEL, 23 FEET OF 2 INCH POLY ALONG MOBERLY STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 850 080.75488 (2,744) INSTALL 1,400 FEET OF 4 INCH, 1,400 FEET OF 2 INCH POLY ALONG NORTH KOLLMAN ROAD AND ABANDON 1,950 FEET OF 2 INCH STEEL AND 850 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY 851 080.75489 (2,377) INSTALL DISTRICT REGULATOR STATION #03 AND 40 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY ALONG WEST AVENUE H AND ABANDON DISTRICT REGULATOR STATION #03, 40 FEET OF 4 INCH, 20 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY 852 080.75490 (3,810) INSTALL 1,260 FEET OF 4 INCH, 15 FEET OF 3 INCH, 125 FEET OF 2 INCH POLY ALONG 24TH STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY 853 080.75493 (40,836) INSTALL DISTRICT REGULATOR STATION #09 AND 40 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY ALONG WEST ALABAMA STREET AND ABANDON DISTRICT REGULATOR STATION #09 AND 40 FEET OF 4 INCH, 40 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY 854 080.75507 (12,175) INSTALL 3,425 FEET OF 2 INCH AND 1,220 FEET OF 4 INCH POLY NEAR THE INTERSECTION OF LEATH AND HAMMERLY IN DALLAS AND ABANDON 825 FEET OF 3 INCH POLY AND 3,820 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 855 080.75520 (14,202) INSTALL 250 FEET OF 2 INCH POLY ALONG 2ND STREET AND ABANDON 300 FEET OF 4 INCH, 750 FEET OF 3 INCH STEEL, 15 FEET OF 4 INCH BARE STEEL, 490 FEET OF 3 INCH, 350 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CELESTE SYSTEM INTEGRITY 856 080.75541 (3,528) INSTALL 900 FEET OF 4 INCH, 350 FEET OF 2 INCH POLY AND ABANDON 30 FEET OF 6 INCH, 880 FEET OF 4 INCH, 550 FEET OF 2 INCH STEEL ALONG JOHNSON STREET. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY MTX Retirements Page 25 of 45 525 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 857 080.75547 (4,792) INSTALL 100 FEET OF 2 INCH, 2,550 FEET OF 4 INCH POLY ALONG WEDGEMONT CIRCLE SOUTH IN FORT WORTH AND ABANDON 2,600 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 858 080.75556 (88,107) INSTALL DISTRICT REGULATOR STATION #29 AT THE INTERSECTION OF PHILLIPS AND MADDISON AND ABANDON DISTRICT REGULATOR STATION #29 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY 859 080.75558 (123,058) INSTALL DISTRICT REGULATOR STATION #31 AT THE INTERSECTION OF BORDER AND BRYAN IN CLEBURNE AND ABANDON DISTRICT REGULATOR STATION #31 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY 860 080.75560 (39,682) INSTALL 2,190 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY ALONG THE INTERSECTION OF DEERWOOD AND RACINE AND ABANDON 2,190 FEET OF 3 INCH, 395 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 861 080.75561 (548) RELOCATE FACILITIES. INSTALL 615 FEET OF 2 INCH POLY ALONG BUSINESS 287 AND I-44 ACCESS ROAD AND ABANDON 615 FEET OF 2 INCH STEEL TO ACCOMODATE TXDOT STREET IMPROVEMENT PROJECT. ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES 862 080.75562 (51,826) INSTALL DISTRICT REGULATOR STATION #10 AT INTERSECTION OF WEST WILSON STREET AND NORTH FIELD STREET IN CLEBURNE AND ABANDON DISTRICT REGULATOR STATION #10 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY 863 080.75563 (70,897) INSTALL DISTRICT REGULATOR STATION #07 AT THE INTERSECTION OF WEST WILSON STREET AND NORTH BUFFALO STREET IN CLEBURNE AND ABANDON DISTRICT REGULATOR STATION #07 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY 864 080.75565 (39,282) INSTALL DISTRICT REGULATOR STATION #04 AT THE INTERSECTION OF EAST HENDERSON AND NORTH LEWIS AND ABANDON DISTRICT REGULATOR STATION #04 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY 865 080.75567 (32,501) REPLACE 191 SERVICE LINES IN DUNCANVILLE IN ACCORDANCE WITH RAILROAD COMMISSION RULE 8.209.ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY 866 080.75571 (4,748) ABANDON 1,335 FEET OF 3 INCH AND 300 FEET OF 2 INCH POLY ALONG FM 1777 IN JOSEPHINE.ALL CUSTOMERS JOSEPHINE SYSTEM INTEGRITY 867 080.75574 (53,283) INSTALL 60 FEET OF 12 INCH POLY ALONG BANK STREET AND ABANDON 60 FEET OF 12 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 868 080.75575 (31,967) INSTALL 68 FEET IN 2 INCH, 984 FEET OF 4 INCH, 1,007 FEET OF 6 INCH POLY AND ABANDON 902 FEET OF 4 INCH STEEL, 1,375 FEET OF STEEL, 294 FEET OF 4 INCH POLY ALONG SMITH STREET AND NORTH ABBOTT STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 869 080.75578 (10,573) INSTALL 2,160 FEET OF 4 INCH AND 470 FEET OF 2 INCH POLY NEAR THE INTERSECTION OF EMBERWOOD AND RACINE IN DALLAS AND ABANDON 2,160 FEET OF 3 INCH, 470 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 870 080.75584 (2,003) INSTALL 1,950 FEET OF 2 INCH POLY FOR THE BROWNWOOD REGIONAL AIRPORT AND ABANDON 75 FEET OF 2 INCH POLY AND 2,002 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNINCORPORATED SYSTEM INTEGRITY 871 080.75587 (473) INSTALL 471 FEET OF 4 INCH POLY ALONG DELAWARE SPRING BOULEVARD AND ABANDON 64 FEET OF 4 INCH POLY AND MAIN LINE REGULATOR #03. ALL CUSTOMERS BURNET RELOCATION OF FACILITIES 872 080.75598 (260,319) INSTALL 1,529 FEET OF 6 INCH, 659 FEET OF 2 INCH, 539 FEET OF 4 INCH POLY ALONG THE ALLEY OF HARRINGTON AVENUE AND LAGONDA AVENUE FROM NW 15TH STREET TO WEST CENTRAL AVE IN FORT WORTH AND ABANDON 1,064 FEET OF 6 INCH, 770 FEET OF 4 INCH POLY, 252 FEET OF 2 INCH, 216 FEET OF 6 INCH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 873 080.75601 (17,818) INSTALL RELIEF VALVE IN MORAN AND ABANDON RELIEF VALVE AT MEASURING STATION 6567.2 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MORAN SYSTEM INTEGRITY 874 080.75605 (86,260) REPLACE 234 SERVICE LINES ALONG THE STREETS OF LAMPASAS IN ACCORDANCE WITH RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS LAMPASAS SYSTEM INTEGRITY 875 080.75606 (5,045) INSTALL 740 FEET OF 2 INCH POLY ALONG SHELTON STREET AND ABANDON 626 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 876 080.75608 (17,078) INSTALL 3,600 FEET OF 2 INCH POLY ALONG COLLEGE STREET IN SULPHUR SPRINGS AND ABANDON 3,650 FEET OF 4 INCH STEEL AND 995 FEET 4 INCH, 230 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY 877 080.75618 (59,263) INSTALL 1,540 FEET OF 2 INCH, 2,490 FEET OF 4 INCH AND 235 FEET OF 6 INCH POLY NEAR THE INTERSECTION OF MERRELL AND CARRIZO IN DALLAS AND ABANDON 2,500 FEET OF 4 INCH, 1,260 FEET OF 3 INCH AND 410 FEET OF 6 INCH STEEL AND 10 FEET OF 4 INCH AND 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 878 080.75623 (276) ABANDON 311 FEET OF 2 INCH STEEL ALONG FRITZ SWANSON ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KILGORE SYSTEM INTEGRITY 879 080.75624 (3,680) INSTALL 2,900 FEET OF 2 INCH POLY AND ABANDON 2,800 FEET OF 2 INCH POLY ALONG WALES COURT IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 880 080.75625 (59,759) INSTALL 840 FEET OF 4 INCH, 1,895 FEET OF 2 INCH POLY NEAR THE INTERSECTION OF SAN VICENTE AND SHILOH IN DALLAS AND ABANDON 810 FEET OF 8 INCH, 30 FEET OF 4 INCH AND 1,895 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 881 080.75628 (2,893) INSATLL 1,645 FEET OF 4 INCH POLY AND ABANDON 1,665 FEET OF 2 INCH STEEL ALONG FLAMINGO ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 882 080.75642 (286) INSTALL 2,090 FEET OF 4 INCH POLY ALONG LAGONDA AVENUE IN FORT WORTH AND ABANDON 2,089 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 883 080.75647 (85,843) INSTALL 430 FEET OF 8 INCH AND 2,200 FEET OF 12 INCH POLY ALONG WALNUT HILL AND MIDWAY IN DALLAS AND ABANDON 70 FEET OF 8 INCH POLY AND 475 FEET OF 8 INCH, 2,200 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 884 080.75648 (21,177) INSTALL 3,185 FEET OF 2 INCH AND 1,360 FEET OF 4 INCH POLY ALONG THE INTERSECTION OF ABILENE AND LEATH AND ABANDON 535 FEET OF 6 INCH, 2,510 FEET OF 3 INCH STEEL, 10 FEET OF 6 INCH AND 680 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 885 080.75649 (1,514) INSTALL 130 FEET OF 4 INCH AND 372 FEET OF 2 INCH POLY ALONG NORTH NEATHERY AND ELM STREETS AND ABANDON 120 FEET OF 3 INCH AND 370 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROADF COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLINSVILLE SYSTEM INTEGRITY 886 080.75650 (37,563) INSTALL 4,215 FEET OF 4 INCH POLY ALONG ODESSA AND LEATH AND ABANDON 480 FEET OF 6 INCH, 3,465 FEET OF 3 INCH AND 10 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 887 080.75651 (29,653) INSTALL 3,370 FEET OF 2 INCH AND 300 FEET OF 4 INCH POLY NEAR THE INTERSECTION OF PALACIOS AND LEATH IN DALLAS AND ABANDON 200 FEET OF 6 INCH, 3,455 FEET OF 3 INCH, 275 FEET OF 2 INCH STEEL, 10 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 888 080.75653 (21,962) INSTALL 1,280 FEET OF 4 INCH POLY ALONG TEXAS STREET AND INSTALL 2,750 FEET OF 2 INCH POLY ALONG JARBO, BEASLEY AND BRINKER STREETS IN SULPHUR SPRINGS AND ABANDON 1,400 FEET OF 4 INCH POLY AND 2,130 FEET OF 4 INCH AND 750 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY 889 080.75656 (3,283) INSTALL 2,054 FEET OF 4 INCH POLY ALONG FLAMINGO ROAD FROM BROOKLINE AVENUE TO OAK HILL STREET IN FORT WORTH AND ABANDON 2,012 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 890 080.75657 (338) INSTALL 360 FEET OF 6 INCH POLY AND ABANDON 435 FEET OF 6 INCH STEEL ALONG TRAIL LAKE DRIVE.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 891 080.75658 (41,740) INSTALL 1,850 FEET OF 6 INCH POLY ALONG HAINES STREET AND ABANDON 1,850 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY MTX Retirements Page 26 of 45 526 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 892 080.75660 (226) RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY 893 080.75682 (2,192) DART METER REPLACEMENT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 894 080.75698 (52,646) INSTALL 2,620 FEET OF 4 INCH AND 160 FEET OF 2 INCH POLY AND ABANDON 515 FEET OF 6 INCH, 300 FEET OF 4 INCH, 1,045 FEET OF 3 INCH, 580 FEET OF 2 INCH, 30 FEET OF 1.5 INCH STEEL AND 25 FEET OF 4 INCH, 985 FEET OF 2 INCH POLY ALONG WHITE SETTLEMENT DUE TO CITY CONFLICT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 895 080.75702 (999) RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY ALONG FM 1417 AND ABANDON 250 FEET OF 4 INCH POLY TO ACCOMODATE TXDOT HWY IMPROVEMENTS. ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES 896 080.75705 (51,687) INSTALL 406 FEET OF 2 INCH, 240 FEET OF 4 INCH POLY ALONG SOUTH CHURCH AND NEW STREET AND ABANDON 2,667 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 897 080.75706 (260) INSTALL 348 FEET OF 4 INCH POLY ALONG MADDOX AVENUE AND ABANDON 348 FEET OF 4 INCH STEEL.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 898 080.75712 (37,586) INSTALL 95 FEET OF 2 INCH, 720 FEET OF 4 INCH, 1,320 FEET OF 6 INCH POLY ALONG S. ABBOTT STREEET AND EAST WALNUT STREET AND ABANDON 1,800 FEET OF 4 INCH STEEL AND 1,105 FEET OF 4 INCH, 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 899 080.75716 (2,056) INSTALL DISTRICT REGULATOR STATION #01 AND 80 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY ALONG NORTH 13TH STREET AND ABANDON DISTRICT REGULATOR STATION #01 AND 5 FEET OF 4 INCH AND 5 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY 900 080.75717 (3,064) INSTALL DISTRICT REGULATOR STATION #04 AND 40 FEET OF 4 INCH, 40 FEET OF 2 INCH POLY ALONG WEST REDBUD LANE AND ABANDON DISTRICT REGULATOR STATION #04 AND 40 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY 901 080.75720 (546) INSTALL 190 FEET OF 2 INCH POLY ALONG WILLIAM STREET AND ABANDON 190 FEET OF 6 INCH STEEL AND 10 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY 902 080.75722 (661) INSTALL 700 FEET OF 4 INCH POLY ALONG KENDOLPH DRIVE AND ABANDON 60 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY 903 080.75723 (2,822) INSTALL 1,808 FEET OF 4 INCH POLY ALONG NELL STREET AND ABANDON 1,820 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 904 080.75728 (6,258) INSTALL 1,416 FEET OF 4 INCH POLY ALONG EASTOVER STREET AND ABANDON 849 FEET OF 3 INCH POLY AND 580 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 905 080.75729 (20,669) INSTALL 1,120 FEET OF 4 INCH AND 1,800 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #04 ALONG SOUTH 4TH STREET AND WALTER STEPHENSON ROAD IN MIDLOTHIAN AND ABANDON DISTRICT REGULATOR STATION #04 AND 140 FEET OF 3 INCH, 310 FEET OF 4 INCH, 1,060 FEET OF 2 INCH POLY, AND 390 FEET OF 3 INCH, 220 FEET OF 2 INCH, 615 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY 906 080.75730 (97,811) INSTALL 1,450 FEET OF 2 INCH AND 480 FEET OF 4 INCH POLY ALONG NORTH WARD STREET AND SAN JACINTO STREET AND ABANDON 470 FEET OF 2 INCH, 100 FEET OF 4 INCH POLY, AND 340 FEET FEET OF 3 INCH, AND 840 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION #02 IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ITALY SYSTEM INTEGRITY 907 080.75731 (16,509) INSTALL 1,180 FEET OF 2 INCH POLY ALONG TAYLOR, WHITE, MAIN AND COUCH STREET AND ABANDON 115 FEET OF 2 INCH POLY, 650 FEET OF 2 INCH, 260 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION #05 IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ITALY SYSTEM INTEGRITY 908 080.75736 (8,555) INSTALL 1,938 FEET OF 2 INCH POLY ALONG HILLSIDE STREET AND SOUTH HUGHES STREET AND ABANDON 1,954 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 909 080.75742 (1,871) INSTALL 460 FEET OF 4 INCH POLY ALONG CHILDERS AVENUE AND ABANDON 440 FEET OF 4 INCH STEEL AND 50 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY 910 080.75750 (5,573) INSTALL DISTRICT REGULATOR STATION #21 AND 30 FEET OF 2 INCH AND 30 FEET OF 4 INCH POLY ALONG PECOS STREET IN COLEMAN AND ABANDON 150 FEET OF 3 INCH POLY AND 5 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION #21 IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY 911 080.75752 (7,803) INSTALL 1,006 FEET OF 2 INCH, 645 FEET OF 4 INCH POLY ALONG TAHOE DRIVE AND ABANDON 1,629 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 912 080.75753 (11,211) INSTALL 2,900 FEET OF 8 INCH AND 125 FEET OF 2 INCH POLY ALONG DALLAS STREET BETWEEN WACO AND VAN ALSTYNE PARKWAY IN VAN ALSTYNE AND ABANDON 2,458 FEET OF 3 INCH, 640 FEET OF 2 INCH STEEL AND 191 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY 913 080.75754 (13,910) INSTALL 2,245 FEET OF 8 INCH, 375 FEET OF 2 INCH AND 200 FEET OF 4 INCH POLY AND ABANDON 70 FEET OF 4 INCH, 607 FEET OF 3 INCH, 144 FEET OF 2 INCH POLY AND 1,150 FEET OF 3 INCH, 638 FEET OF 2 INCH STEEL ALONG DALLAS AND JEFFERSON STREETS IN VAN ALSTYNE, GRAYSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY 914 080.75758 (7,873) INSTALL 2,450 FEET OF 2 INCH POLY ALONG MAGNOLIA AND HICKORY AND ABANDON 2,235 FEET OF 2 INCH STEEL AND 215 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY 915 080.75769 (4,110) INSTALL 1,285 FEET OF 4 INCH POLY ALONG PECOS STREET FROM EASTOVER AVENUE TO PARKER HENDERSON IN FORT WORTH AND ABANDON 1,273 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 916 080.75770 (4,705) INSTALL 1,458 OF 2 INCH POLY AND ABANDON 589 FEET OF 2 INCH STEEL AND 24 FEET OF 2 INCH POLY ALONG GLENWOOD LANE IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY 917 080.75777 (5,585) INSTALL 2,325 FEET OF 2 INCH POLY ALONG OAK AND PINE AND ABANDON 2,325 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY 918 080.75780 (241,721) INSTALL 70 FEET OF 2 INCH, 3.052 FEET OF 6 INCH, 5 FEET OF 4 INCH POLY ALONG IVY STREET AND SMITH STREET IN HILLSBORO AND ABANDON 3,212 FEET OF 4 INCH STEEL, 112 FEET OF 3 INCH, 806 FEET OF 4 INCH, AND 1,486 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 919 080.75782 (7,331) INSTALL 286 FEET OF 2 INCH POLY AND ABANDON 286 FEET OF 2 INCH POLY ALONG WELLINGTON IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 920 080.75784 (677) INSTALL DISTRICT REGULATOR STATION #19 AND ABANDON DISTRICT REGULATOR STATION #19 ALONG LILLIAN STREET BETWEEN LONG AND MCNEIL STREET IN STEPHENVILLE IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY 921 080.75786 (20,842) INSTALL 772 FEET OF 4 INCH, 595 FEET OF 2 INCH, 590 FEET OF 6 INCH POLY ALONG HARRINGTON AVENUE AND HOMAN AVENUE IN FORT WORTH AND ABANDON 2,114 FEET OF POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 922 080.75788 (5,854) INSTALL 1,450 FEET OF 4 INCH, 404 FEET OF 2 INCH POLY ALONG HOMAN AVENUE FROM NORTHWEST 15TH STREET TO NORTHWEST 14TH STREET IN FORT WORTH AND ABANDON 880 FEET OF 3 INCH STEEL AND 934 FEET OF POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 923 080.75795 (438) ABANDON 472 FEET OF 2 INCH STEEL ALONG PEAVINE RAOD AND PRIVATE ROAD 3531 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KILGORE SYSTEM INTEGRITY 924 080.75797 (9,477) RELOCATE FACILITIES. INSTALL 277 FEET OF 6 INCH POLY ALONG COUNTY ROAD 199 AND CROSS CREEK BOULEVARD ALL CUSTOMERS HUTTO RELOCATION OF FACILITIES MTX Retirements Page 27 of 45 527 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 925 080.75799 (3,722) INSTALL 2,100 FEET OF 4 INCH, 1,000 FEET OF 2 INCH POLY ON SH 14 AND COLLEGE STREET IN MEXIA AND ABANDON 2,745 FEET OF 2 INCH STEEL AND 382 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY 926 080.75806 (118,863) INTALL 582 FEET OF 4 INCH, 735 FEET OF 6 INCH POLY ALONG THE ALLEY OF HOMAN AVENUE AND HARRINGTON AVENUE IN FORT WORTH AND ABANDON 640 FEET OF 8 INCH, 584 FEET OF 4 INCH, 94 FEET OF 6 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 927 080.75807 (14,123) INSTALL 1,200 FEET OF 2 INCH POLY ALONG MILDRED LANE AND ABANDON 1,200 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY 928 080.75808 (387) INSTALL 60 FEET OF 4 INCH POLY ALONG ESTERS AND CONFLANS ROAD AND ABANDON 60 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS IRVING SYSTEM INTEGRITY 929 080.75815 (583) INSTALL 70 FEET OF 4 INCH POLY ALONG BONNIE VIEW ROAD. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 930 080.75818 (7,017) INSTALL 925 FEET OF 8 INCH POLY ALONG INTERSTATE 30 AND ABANDON 860 FEET OF 8 INCH POLY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FATE RELOCATION OF FACILITIES 931 080.75821 (1,780) INSTALL 770 FEET OF 4 INCH POLY ALONG EAST KELLIS AND ABANDON 445 FEET OF 3 INCH STEEL AND 318 FEET OF 4 INCH POLY IN ACCORDANCE WTIH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 932 080.75825 (11,701) ABANDON 30 FEET&NBSP; OF 4 INCH, 10 FEET OF 6 INCH STEEL IN CITY OF STAMFORD DISTRICT REGULATOR STATIONS #04 AND #22 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY 933 080.75827 (218) INSTALL 40 FEET OF 2 INCH AND 40 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #03 ALONG 8TH STREET AND ROBINSON STREET AND ABANDON 10 FEET OF 2 INCH POLY AND 10 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILES SYSTEM INTEGRITY 934 080.75828 (20,642) INSTALL 260 FEET OF 4 INCH POLY, SWEETWATER DISTRICT REGULATOR STATIONS #03, #06, AND #15 AND ABANDON 50 FEET OF 4 INCH, 65 FEET OF 6 INCH, 10 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY AND SWEETWATER DISTRICT REGULATOR STATIONS #03, #06, AND #15 IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY 935 080.75830 (1,182) INSTALL 80 FEET OF 2 INCH POLY AND LORAINE DISTRICT REGULATOR STATION DRS02 AND ABANDON LORAINE DISTRICT REGLATOR STATION DRS02 AND 10 FEET OF 2 INCH AND 10 FEET OF 3 INCH STEEL ALONG THE STREETS OF LORAINE, MITCHELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LORAINE SYSTEM INTEGRITY 936 080.75845 (58,892) ABANDON 365 FEET OF 4 INCH, 685 FEET OF 6 INCH, 100 FEET OF 6 INCH STEEL AND DISTRICT REGULATOR STATION #03 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY 937 080.75847 (257) INSTALL 120 FEET OF 4 INCH POLY ALONG HIGHWAY 66 AND ABANDON 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 938 080.75854 (9,452) INSTALL 2,297 FEET OF 8 INCH AND 250 FEET OF 2 INCH POLY ALONG BOBTOWN ROAD AND ABANDON 2,287 FEET OF 6 INCH AND 187 FEET OF 2 INCH STEEL INSTALL 120 FEET OF 4 INCH POLY ALONG HIGHWAY 66 AND ABANDON 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 939 080.75858 (11,281) INSTALL 280 FEET OF 8 INCH POLY ALONG VINEYARD ROAD AND ABANDON 280 FEET OF 8 INCH STEEL INSTALL 120 FEET OF 4 INCH POLY ALONG HIGHWAY 66 AND ABANDON 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY 940 080.75860 (37,290) INSTALL 533 FEET OF 6 INCH, 416 FEET OF 4 INCH IN THE ALLEY OF HOMAN AVENUE AND HARRINGTON AVENUE IN FORT WORTH AND ABANDON 701 FEET OF 6 INCH AND 416 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 941 080.75863 (48,749) INSTALL 1,400 FEET OF 4 INCH AND 350 FEET OF 2 INCH POLY ALONG PIONEER DRIVE AND ABANDON 1,100 FEET OF 4 INCH, 100 FEET OF 4 INCH AND 100 FEET OF 2 INCH POLY INSTALL 120 FEET OF 4 INCH POLY ALONG HIGHWAY 66 AND ABANDON 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY 942 080.75867 (585) INSTALL 185 FEET OF 2 INCH POLY ALONG EAST SOUTH STREET AND ABANDON 110 FEET OF 4 INCH STEEL, 175 FEET OF 3 INCH AND 14 FEET OF 4 INCH POLY INSTALL 120 FEET OF 4 INCH POLY ALONG HIGHWAY 66 AND ABANDON 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY 943 080.75870 (675) INSTALL 290 FEET OF 2 INCH POLY ALONG TRIPP ROAD AND ABANDON 280 FEET OF 2 INCH STEEL INSTALL 120 FEET OF 4 INCH POLY ALONG HIGHWAY 66 AND ABANDON 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SUNNYVALE SYSTEM INTEGRITY 944 080.75883 (480) INSTALL 140 FEET OF POLY AND DISTRICT REGULATOR STATION #01 ALONG MOSS STREET IN EASTLAND AND ABANDON 225 FEET OF 3 INCH, 142 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION #01 INSTALL 120 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DE LEON SYSTEM INTEGRITY 945 080.75894 (1,197) INSTALL 140 FEET OF 8 INCH POLY ALONG MEMORIAL PARKWAY AND ABANDON 130 FEET OF 8 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FATE SYSTEM INTEGRITY 946 080.75907 (1,060) INSTALL 400 FEET OF 4 INCH POLY ALONG NORTH RACE STREET AND ABANDON 480 FEET OF 4 INCH, 100 FEET OF 4 INCH STEEL, 158 FEET OF 2 INCH POLY INSTALL 120 FEET OF 4 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209 ALL CUSTOMERS EVERMAN SYSTEM INTEGRITY 947 080.75908 (2) INSTALL 375 FEET OF 2 INCH POLY ALONG SHADY GROVE ROAD. ALL CUSTOMERS IRVING SYSTEM INTEGRITY 948 080.75911 (2,523) RELOCATE FACILITIES. INSTALL 680 FEET OF 4 INCH POLY ALONG KNOWLES DRIVE AND ABANDON 300 FEET OF 4 INCH AND 2,195 FEET OF 2 INCH POLY TO ACCOMODATE THE CITY OF SAGINAW IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209 ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY 949 080.75919 (114,734) INSTALL 2,246 FEET OF 6 INCH, 145 FEET OF 4 INCH, 1,330 FEET OF 2 INCH POLY AND ABANDON 920 FEET OF 6 INCH, 190 FEET OF 4 INCH AND 820 FEET OF 2 INCH STEEL ALONG SANGER AVENUE FROM LAKE AIR DRIVE TO WESTVIEW DRIVE IN WACO, MCCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY 950 080.75921 (790) INSTALL 75 FEET OF 2 INCH POLY ALONG OLD DENTON ROAD AND ABANDON 50 FEET OF 2 INCH POLY.ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY 951 080.75922 (1,098) INSTALL 435 FEET OF 4 INCH POLY ALONG ELM STREET AND ABANDON 300 FEET OF 4 INCH, 115 FEET OF 2 INCH AND 40 FEET OF 1.25 INCH STEEL AND 30 FEET OF 3 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209 ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY 952 080.75924 (3,872) INSTALL DISTRICT REGULATOR STATION #01 AND 90 FEET OF 4 INCH AND 90 FEET OF 2 INCH POLY ALONG TEXAS LAKES TRAIL AND GRACE STREET IN GLEN ROSE AND ABANDON 90 FEET OF 4 INCH AND 90 FEET OF 3 INCH STEEL AND DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLEN ROSE SYSTEM INTEGRITY 953 080.75925 (11,068) INSTALL 200 FEET OF 4 INCH AND 30 FEET OF 2 INCH POLY AND DISTRICT REGULATOR #02 ALONG WEST PIERSON STREET AND SOUTH COLLEGE STREET IN HAMILTON AND ABANDON 210 FEET OF 4 INCH, 11 FEET OF 6 INCH AND 30 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION #02 AND #03 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HAMILTON SYSTEM INTEGRITY 954 080.75954 (558) INSTALL 100 FEET OF 4 INCH ALONG BELMEADE DRIVE AND GOLDEN BEAR DRIVE AND ABANDON 100 FEET OF 4 INCH POLY. ALL CUSTOMERS CARROLLTON RELOCATION OF FACILITIES 955 080.75966 (36,917) RELOCATE FACILITIES. INSTALL 1,755 FEET OF 4 INCH POLY AND ABANDON 1,755 FEET OF 6 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 956 080.75967 (73,928) RELOCATE FACILITIES. INSTALL 1,000 FEET OF 4 INCH AND 800 FEET OF 2 INCH POLY ALONG MILLET AVENUE AND ABANDON 1,725 FEET OF 4 INCH AND 200 FEET OF 6 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY MTX Retirements Page 28 of 45 528 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 957 080.75968 (114,046) INSTALL 3,100 FEET OF 8 INCH, 425 FEET OF 4 INCH, 255 FEET OF 2 INCH POLY AND ABANDON 3,000 FEET OF 6 INCH, 150 FEET OF 4 INCH POLY ALONG SOUTH CLARK ROAD IN CEDAR HILL, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DESOTO SYSTEM INTEGRITY 958 080.75975 (4,043) INSTALL 580 FEET OF 2 INCH POLY ALONG WOOD STREET IN WINTERS AND ABANDON 500 FEET OF 6 INCH STEEL AND 110 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WINTERS SYSTEM INTEGRITY 959 080.75976 (19,734) INSTALL 470 FEET OF 6 INCH POLY ALONG NINTH STREET IN BALLINGER AND ABANCON 470 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY 960 080.75987 (31) INSTALL TWO (2) 8 INCH STOPPLES AND FOUR (4) 2 INCH TOR TO REPAIR A LEAK ON LINE 232 IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 961 080.75994 (63,543) INSTALL DISTRICT REGULATOR STATION #04, 885 FEET OF 4 INCH, 25 FEET OF 2 INCH POLY ALONG SOUTH BOND STREET AND WEST SPRUCE STREET IN WHITEWRIGHT AND ABANDON DISTRICT REGULATOR STATION #041, 34 FEET OF 3 INCH, 20 FEET OF 2 INCH STEEL AND 62 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WHITEWRIGHT SYSTEM INTEGRITY 962 080.76004 (537) INSTALL 120 FEET OF 8 INCH POLY ALONG MOUNT VIEW AVENUE AND ABANDON 120 FEET OF 4 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 963 080.76012 (15,209) INSTALL 1,175 FEET OF 2 INCH AND 215 FEET OF 4 INCH POLY ALONG RYAN PLACE DRIVE AND ABANDON 1,065 FEET OF OF 3 INCH STEEL, 70 FEET OF 3 INCH AND 60 FEET OF 4 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 964 080.76018 (7,479) INSTALL 330 FEET OF 6 INCH POLY ALONG FM 2818 AND ABANDON 330 FEET OF 6 INCH POLY TO ACCOMODATE CITY OF COLLEGE STATION STREET PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY 965 080.76024 (45,850) INSTALL DISTRICT REGULATOR STATION #07 AND 70 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY ALONG NORTH WOOD STREET AND MEADOWBRIDGE STREET IN FERRIS AND ABANDON DISTRICT REGULATOR STATION #07 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FERRIS SYSTEM INTEGRITY 966 080.76025 (36,759) INSTALL DISTRICT REGULATOR STATION #01 40 FEET OF 2 INCH AND 40 FEET OF 4 INCH POLY ALONG SOUTH CHURCH STREET AND WEST 6TH STREET IN FERRIS AND ABANDON DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FERRIS SYSTEM INTEGRITY 967 080.76026 (1,172) INSTALL 575 FEET OF 4 INCH POLY ALONG THE ALLEY OF WALKER AND BOND STREET AND ABANDON 188 FEET OF 3 INCH STEEL AND 199 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY 968 080.76027 (1,720) INSTALL 1,370 FEET OF 6 INCH AND 1,951 FEET OF 2 INCH POLY AND ABANDON 1,352 FEET OF 8 INCH, 1,742 FEET OF 2 INCH AND 693 FEET OF 1.25 INCH STEEL ALONG RICHLAND DRIVE AND TENNYSON DRIVE IN WACO, MCCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 969 080.76033 (1,971) INSTALL 29 FEET OF 4 INCH POLY ALONG MURPHY STREET AND ABANDON 44 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 970 080.76039 (36,993) INSTALL 2,750 FEET OF 2 INCH AND 835 FEET OF 4 INCH POLY ALONG MAYBETH IN DALLAS AND ABANDON 590 FEET OF 6 INCH, 2,755 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 971 080.76047 (482) INSTALL 340 FEET OF 2 INCH POLY ALONG WESTWOOD IN ABILENE AND ABANDON 130 FEET OF 3 INCH STEEL AND 70 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 972 080.76052 (677) INSTALL 375 FEET OF 4 INCH POLY ALONG HIGHWAY 84 AT JEWELL DRIVE AND ABANDON 375 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY 973 080.76055 (91) INSTALL 50 FEET OF 2 INCH POLY ALONG WILSON AT DUVAL AND ABANDON 45 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 974 080.76085 (12,080) INSTALL 1,430 FEET OF 2 INCH POLY ALONG HODDE STREET AND ABANDON 1,430 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 975 080.76087 (13,726) INSTALL 65 FEET OF 4 INCH, 25 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #03 ALONG STREETS OF BAIRD AND ABANDON DISTRICT REGULATOR STATION #03 AND 60 FEET OF 4 INCH STEEL AND 10 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BAIRD SYSTEM INTEGRITY 976 080.76088 (40,999) INSTALL 370 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #16 ALONG THE STREETS OF ABILENE AND ABANDON 162 FEET OF 4 INCH AND 10 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION #16 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 977 080.76089 (24,977) INSTALL 165 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #28 ALONG THE STREETS OF ABILENE AND ABANDON 20 FEET OF 2 INCH, 180 FEET OF 4 INCH AND DISTRICT REGULATOR STATION #28 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 978 080.76093 (35,581) INSTALL 2,225 FEET OF 2 INCH POLY ALONG RAYNELLE STREET IN DALLAS AND ABANDON 2,225 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 979 080.76098 (92,382) INSTALL 1,400 FEET OF 6 INCH, 20 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY ALONG HALL STREET IN DALLAS AND ABANDON 1,375 FEET OF 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 980 080.76101 (35,408) INSTALL DISTRICT REGULATOR STATION #05, 290 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG SOUTH MABEL STREET AND 8TH STREET IN FERRIS AND ABANDON DISTRICT REGULATOR STATON #05 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FERRIS SYSTEM INTEGRITY 981 080.76107 (48,829) INSTALL DISTRICT REGULATOR STATION #47 ALONG IH35E AND TEASLEY ROAD AND ABANDON DISTRICT REGULATOR STATION #47. ALL CUSTOMERS DENTON SYSTEM INTEGRITY 982 080.76110 (20,406) INSTALL 20 FEET OF 6 INCH, 10 FEET OF 2 INCH STEEL AND ABANDON 20 FEET OF 6 INCH AND 10 FEET OF 2 INCH STEEL AT THE AMAZON WAREHOUSE IN FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 983 080.76111 (16,412) INSTALL 950 FEET OF 2 INCH POLY ALONG JOLINE AND AVENUE K AND ABANDON 1,005 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 984 080.76120 (232,524) INSTALL DISTRICT REGULATOR STATION #02 AND 40 FEET OF 4 INCH POLY ALONG CAMPUS STREET AND EAST 5TH STREET IN FERRIS AND ABANDON DISTRICT REGULATOR STATION #02 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FERRIS SYSTEM INTEGRITY 985 080.76121 (6,677) INSTALL 400 FEET OF 2 INCH POLY ALONG WEST LANE AND ABANDON 400 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL SYSTEM INTEGRITY 986 080.76122 (3,096) INSTALL 676 FEET OF 4 INCH AND 15 FEET OF 2 INCH POLY ALONG BROCKETT STREET AND ABANDON 601 FEET OF 3 INCH STEEL AND 77 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLINSVILLE SYSTEM INTEGRITY 987 080.76127 (21,314) ABANDON 535 FEET OF 4 INCH AND 575 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 988 080.76138 (494) INSTALL 40 FEET OF 2 INCH, 160 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #01 ON EAST MARSHALL STREET AND ABANDON 80 FEET OF 3 INCH STEEL, 30 FEET OF 4 INCH AND 160 FEET OF 3 INCH POLY AND DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS PALMER SYSTEM INTEGRITY 989 080.76140 (34,647) INSTALL 40 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #03 ALONG EAST MARSHALL STREET IN PALMER AND ABANDON 40 FEET OF 3 INCH, 100 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION #03 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALMER SYSTEM INTEGRITY 990 080.76141 (2,971) INSTALL 1,200 FEET OF 4 INCH, 1,140 FEET OF 2 INCH ALONG FOREST TRAIL AND PALMETTO DRIVE IN TEMPLE AND ABANDON 2,250 FEET OF 2 INCH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY MTX Retirements Page 29 of 45 529 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 991 080.76143 (24,847) INSTALL 1,255 FEET OF 6 INCH, 2,245 FEET OF 4 INCH ALONG WESTMORELAND IN DALLAS AND ABANDON 1,210 FEET OF 6 INCH, 360 FEET OF 4 INCH, 1,796 FEET OF 3 INCH, AND 338 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 992 080.76145 (14,332) INSTALL 1,300 FEET OF 6 INCH AND 60 FEET OF 2 INCH POLY ALONG OVERTON STREET AND ABANDON 1,300 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 993 080.76149 (48,094) INSTALL 1,900 FEET OF 2 INCH POLY ALONG THE ALLEY BETWEEN EAST ELM STREET AND EAST PARK STREET FROM IVY STREET TO CORPORATON DRIVE IN HILLSBORO AND ABANDON 1,845 FEET OF 4 INCH STEEL AND 605 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 994 080.76150 (47,947) INSTALL 1,850 FEET OF 2 INCH POLY ALONG LEONARD STREET AND ABANDON 500 FEET OF 2 INCH POLY AND 1,225 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL SYSTEM INTEGRITY 995 080.76151 (14,082) INSTALL 1,065 FEET OF 2 INCH, 25 FEET OF 4 INCH, 1,210 FEET OF 6 INCH POLY ALONG WORTH WACO STREET AND WEST PASCHAL STREET IN HILLSBORO AND ABANDON 730 FEET OF 2 INCH AND 186 FEET OF 4 INCH STEEL AND 292 FEET OF 2 INCH, 216 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 996 080.76155 (460) ABANDON 299 FEET OF 4 INCH STEEL ALONG GRAYSON AND OAK IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA SYSTEM INTEGRITY 997 080.76160 (9,247) INSTALL TWO (2) INCH MOONEY REGULATORS ON MCKINNEY DISTRICT REGULATOR STATION #04 AND ABANDON TWO (2) 1 INCH MOONEY REGULATOR TO INCREASE CAPACITY.ALL CUSTOMERS MCKINNEY SYSTEM IMPROVEMENT 998 080.76161 (26,461) INSTALL 300 FEET OF 2 INCH POLY ALONG GEORGE AVENUE AND ABANDON 280 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL SYSTEM INTEGRITY 999 080.76166 (18,182) INSTALL 350 FEET OF 4 INCH POLY ALONG HIGHLAND DRIVE AND ABANDON 340 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 1000 080.76182 (653) RELOCATE FACILITIES. INSTALL 150 FEET OF 2 INCH POLY TO ALONG KNOLL DRIVE NEAR CRESTWAY DRIVE.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 1001 080.76189 (152) INSTALL 80 FEET OF 2 INCH POLY AND ABANDON 80 FEET OF 2 INCH POLY ALONG TIMBERVIEW STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY 1002 080.76192 (4,571) INSTALL 550 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #13 ALONG MARSHALL STREET AND ABANDON 50 FEET OF 4 INCH POLY, 404 FEET OF 4 INCH CAST IRON, 125 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION #13 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 1003 080.76198 (21,212) INSTALL 2,113 FEET OF 6 INCH POLY ALONG MYRTA STREET AND WHELESS AVENUE, 449 FEET OF 4 INCH POLY ALONG OAK STREET AND HILLCREST AVENUE AND 516 FEET OF 2 INCH POLY ALONG WHELESS AVENUE IN KERRVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY 1004 080.76199 (21,115) INSTALL 1,903 FEET OF 2 INCH POLY IN ALLEY BETWEEN WHELESS AVENUE AND PRESCOTT STREET AND 442 FEET OF 4 INCH POLY ALONG OAKS STREET IN KERRVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY 1005 080.76200 (21,922) INSTALL 2,397 FEET OF 2 INCH POLY ALONG MOORE STREET AND IN ALLEY BETWEEN WASHINGTON STREET AND OAK STREET IN KERRVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY 1006 080.76201 (20,370) INSTALL 2,607 FEET OF 2 INCH POLY ALONG E. MAIN STREET, JEFFERSON STREET AND ARANSAS STREET IN KERRVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY 1007 080.76202 (27,805) INSTALL 2,007 FEET OF 4 INCH POLY ALONG LYTLE STREET AND JEFFERSON STREET AND 662 FEET OF 2 INCH POLY ALONG 1ST STREET IN KERRVILLE, KERR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY 1008 080.76205 (17,196) INSTALL 1,762 FEET OF 2 INCH POLY AND ABANDON 1,443 FEET OF 2 INCH STEEL ALONG CHAMBERLAIN STREET IN IRVING IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS IRVING SYSTEM INTEGRITY 1009 080.76217 (7,983) INSTALL 2,160 FEET OF 2 INCH POLY ALONG EMBERWOOD AND FAIRWOOD AND ABANDON 2,110 FEET OF 3 INCH STEEL AND 100 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1010 080.76225 (1,023) ABANDON 270 FEET OF 2 INCH AND 284 FEET OF 4 INCH POLY AND 60 FEET OF 2 INCH STEEL ALONG AVENUE D AND AVENUE E IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1011 080.76248 (687) INSTALL 1 REGULATOR AND ABANDON 1 REGULATOR AT WESTLAKE CITY GATE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY 1012 080.76250 (35,331) INSTALL 2,170 FEET OF 2 INCH , 330 FEET OF 4 INCH POLY IN THE ALLEY BETWEEN FAIRWOOD AND GOLDWOOD IN DALLAS AND ABANDON 2,170 FEET OF 3 INCH, 320 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1013 080.76256 (42,345) RELOCATE FACILITIES. INSTALL 65 FEET OF 2 INCH AND 1,050 FEET OF 4 INCH POLY ALONG ROBERTS CUT OFF AND ABANDON 20 FEET OF 2 INCH POLY AND 1,189 FEET OF 2 INCH STEEL TO ACCOMODATE CITY OF RIVER OAKS STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY 1014 080.76259 (9,158) INSTALL 850 FEET OF 4 INCH POLY ALONG MARY DRIVE AND WILLOW STREET IN HURST AND ABANDON 786 FEET OF 4 INCH STEEL AND 34 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY 1015 080.76260 (10,389) INSTALL 430 FEET OF 2 INCH AND 1,230 FEET OF 6 INCH POLY ALONG BUENA VISTA DRIVE IN HURST AND ABANDON 501 FEET OF 1.25 INCH POLY AND 1,800 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY 1016 080.76262 (10,797) INSTALL 1,480 FEET OF 2 INCH POLY ALONG WEST CEDAR STREET AND ABANDON 1,436 FEET OF 2 INCH POLY AND 19 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY 1017 080.76263 (15,707) INSTALL 1,655 FEET OF 4 INCH POLY ALONG WEST OAK STREET AND ABANDON 16 FEET OF 2 INCH, 87 FEET OF 4 INCH STEEL AND 967 FEET OF 2 INCH, 20 FEET OF 3 INCH, AND 9 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY 1018 080.76264 (16,019) INSTALL 2,155 FEET OF 4 INCH POLY ALONG NORWOOD DRIVE AND EAST OAK DRIVE IN HURST AND ABANDON 217 FEET OF 2 INCH, 17 FEET OF 3 INCH, AND 323 FEET OF 4 INCH POLY AND 236 FEET OF 3 INCH, 1,067 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY 1019 080.76265 (15,628) INSATLL 1,534 FEET OF 4 INCH POLY ALONG NORWOOD DRIVE IN HURST AND ABANDON 609 FEET OF 4 INCH POLY AND 1,340 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY 1020 080.76266 (11,077) INSTALL 1,900 FEET OF 6 INCH POLY ALONG WILLOW STREET AND HARRISON LANE IN HURST AND ABANDON 1,242 FEET OF 3 INCH AND 14 FEET OF 4 INCH STEEL AND 57 FEET OF 3 INCH AND 14 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY 1021 080.76267 (6,721) ISNTALL 1,500 FEET OF 6 INCH POLY ALONG HARRISON LANE AND REDBUD DRIVE IN HURST AND ABANDON 17 FEET OF 2 INCH AND 1,285 FEET OF 4 INCH STEEL AND 123 FEET OF 2 INCH AND 178 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY 1022 080.76268 (13,446) INSTALL 1,293 FEET OF 2 INCH POLY ALONG ELM STREET IN HURST AND ABANDON 1,229 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY 1023 080.76269 (11,063) INSTALL 1,250 FEET OF 4 INCH POLY ALONG PECAN STREET IN HURST AND ABANDON 12 FEET OF 4 INCH STEEL AND 1,307 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY 1024 080.76270 (16,280) ISNTALL 1,765 FEET OF 2 INCH POLY ALONG SOUDER DRIVE AND HARMON ROAD IN HURST AND ABANDON 1,773 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY 1025 080.76293 (8,500) INSTALL 43 FEET OF 4 INCH AND 2 FEET OF 4 INCH ALONG WEST WHITE STREET AT SOUTH WASHINGTON STREET AND ABANDON 35 FEET OF 4 INCH AND 5 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PILOT POINT SYSTEM INTEGRITY MTX Retirements Page 30 of 45 530 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 1026 080.76315 (15,366) INSTALL 2,450 FETT OF 6 INCH, 350 FEET OF 2 INCH POLY ALONG BARDFIELD AVENUE ALLEY FROM KEYSTONE STREET TO SEQUOIA DRIVE AND ABANDON 2,450 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1027 080.76330 (23,090) INSTALL 1,170 FEET OF 6 INCH POLY ALONG BARDFIELD AVENUE ALLEY FROM SEQUOIA DRIVE TO CENTERVILLE ROAD IN GARLAND AND ABANDON 1,170 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1028 080.76332 (8,992) INSTALL 2,680 FEET OF 2 INCH POLY ALONG KEYSTONE STREET FROM BARDFIELD AVENUE TO SHADWELL DRIVE AND ABANDON 2,150 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1029 080.76335 (19,985) INSTALL 2,450 FEET OF 2 INCH POLY ALONG KAZAK STREET FROM BARDFIELD AVENUE TO SHADWELL DRIVE AND ABANDON 2,430 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1030 080.76338 (14,093) INSTALL 3,000 FEET OF 2 INCH POLY ALONG KEELE DRIVE FROM BARDFIELD AVENUE TO SHADWELL DRIVE IN GARLAND AND ABANDON 2,430 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1031 080.76339 (5,140) INSTALL 2,085 FEET OF 2 INCH POLY AND ABANDON 1,100 FEET OF 2 INCH POLY ALONG BARDFIELD AVENUE FROM NIAGARA STREET TO CENTERVILEE ROAD IN GARLAND IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1032 080.76343 (9,352) INSTALL 2,070 FEET OF 2 INCH POLY ALONG NIAGARA STREET FROM CANDLEWOOD LANE TO BARDFIELD AVENUE IN GARLAND AND ABANDON 1,320 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1033 080.76346 (4,970) INSTALL 920 FEET OF 2 INCH POLY ALONG SEQUOIA DRIVE FROM NIAGARA STREET TO BARDFIELD AVENUE IN GARLAND AND ABANDON 900 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1034 080.76347 (5,857) INSTALL 1,210 FEET OF 2 INCH POLY ALONG CASHMERE DRIVE FROM NIAGARA STREET TO BARDFIELD AVENUE IN GARLAND AND ABANDON 1,200 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1035 080.76349 (4,752) INSTALL 1,110 FEET OF 2 INCH POLY ALONG MAYFIELD AVENUE FROM KEELE DRIVE TO CANDLEWOOD LANE IN GARLAND AND ABANDON 750 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1036 080.76350 (11,057) INSTALL 1,270 FEET OF 2 INCH POLY ALONG CANDLEWOOD LANE FROM MAYFIELD AVENUE TO BARDFIELD AVENUE IN GARLAND AND ABANDON 1,300 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1037 080.76354 (15,732) INSTALL 2,850 FEET OF 4 INCH POLY ALONG THE STREETS OF COLLINSVILLE AND ABANDON 1,630 FFET OF 3 INCH STEEL, 320 FEET OF 3 INCH AND 218 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLINSVILLE SYSTEM INTEGRITY 1038 080.76356 (2,483) INSTALL 1,780 FEET OF 2 INCH POLY ALONG BRAEMAR DRIVE AND ABANDON 1,600 FEET OF 2 INCH STEEL AND 195 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 1039 080.76364 (261) INSTALL 80 FEET OF 4 INCH POLY AND ABANDON 60 FEET OF 4 INCH POLY ASSOCIATED WITH A UTILITY CONFLICT.ALL CUSTOMERS WILMER RELOCATION OF FACILITIES 1040 080.76370 (67) INSTALL 20 FEET OF 6 INCH STEEL ALONG HK DODGEN LOOP IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY 1041 080.76375 (109,717) INSTALL DISTRICT REGULATOR STATION #01, 80 FEET OF 4 INCH POLY BETWEEN WEST 3RD STREET AND 2ND STREET IN VENUS AND ABANDON DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VENUS SYSTEM INTEGRITY 1042 080.76376 (64,986) INSTALL 182 SUSL ALONG STREETS IN DUNCANVILLE IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY 1043 080.76378 (2,352) INSTALL 215 FEET OF 4 INCH POLY ALONG SPEEDWAY AND MARIE AND ABANDON 215 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1044 080.76379 (13,253) RELOCATE FACILITIES. INSTALL 1,233 FEET OF 2 INCH AND 2,000 FEET OF 4 INCH POLY ALONG ROBERTS CUT IN RIVER OAKS AND ABANDON 17 FEET OF 2 INCH POLY AND 1,179 FEET OF 2 INCH AND 1,937 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY 1045 080.76382 (3,425) INSTALL 1,159 FEET OF 6 INCH, 196 FEET OF 4 INCH AND 735 FEET OF 2 INCH POLY ALONG WEST CENTRAL AND ABANDON 1,949 FEET OF 2 INCH STEEL AND 160 FEET OF 3 INCH POLY IN GEORGETOWN, WILLIAMSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY 1046 080.76390 (51,213) INSTALL 2,325 FEET OF 6 INCH POLY ALONG BROCKBANK NORTH OF WALNUT HILL IN DALLAS AND ABANDON 2,325 FEET OF 6 INCH STEEL AND 10 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1047 080.76402 (4,754) INSTALL 1,785 FEET OF 2 INCH POLY ALONG WHIRLAWAY NEAR HARWICH IN DALLAS AND ABANDON 1,785 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1048 080.76404 (37) ABANDON 95 FEET OF 2 INCH STEEL ALONG WEST SYCAMORE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY 1049 080.76405 (63) INSTALL 60 FEET OF 2 INCH POLY ALONG DOGWOOD DRIVE AND ABANDON 45 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY 1050 080.76419 (19,817) INSTALL 2,030 FEET OF 2 INCH AND 60 FEET OF 6 INCH POLY ALONG YUMA AND PHOENIX STREETS AND ABANDON 1,010 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1051 080.76420 (10,893) INSTALL 1,650 FEET OF POLY ALONG COVINGTON IN WICHITA FALLS AND ABANDON 1,895 FEET OF STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1052 080.76421 (14,253) INSTALL 1,425 FEET OF 2 INCH POLY ALONG YUMA AND GUNNISON IN WICHITA FALLS AND ABANDON 825 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1053 080.76422 (4,754) INSTALL 1,350 FEET OF 2 INCH POLY ALONG CLOVIS AND RUIDOSA IN WICHITA FALLAS AND ABANDON 865 FEET OF 2 INCH AND 1,020 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1054 080.76425 (141,815) INSTALL 75 FEET OF 4 INCH POLY ALONG HORNE STREET, 450 FEET OF 2 INCH POLY ALONG CARVER DRIVE AND HELMICK AVENUE AND ABANDON 450 FEET OF 3 INCH STEEL AND 30 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1055 080.76426 (8,223) INSTALL 1,890 FEET OF 2 INCH POLY ALONG RUIDOSA AND YUMA IN WICHITA FALLS AND ABANDON 1,614 FEET OF 2 INCH AND 133 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1056 080.76428 (3,551) INSTALL 630 FEET OF 2 INCH POLY ALONG YUMA AND GUNNISON IN WICHITA FALLS AND ABANDON 510 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1057 080.76429 (3,900) INSTALL 1,435 FEET OF 2 INCH POLY ALONG SHASTA AND GUNNISON IN WICHITA FALLS AND ABANDON 454 FEET OF 2 INCH AND 453 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1058 080.76431 (16,693) INSTALL 95 FEET OF 2 INCH AND 1,220 FEET OF 6 INCH POLY AND ABANDON 936 FEET OF 6 INCH, 522 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG PHOENIX AND SHASTA IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1059 080.76434 (30,843) INSTALL DISTRICT REGULATOR STATION #04, 40 FEET OF 2 INCH, AND 80 FEET OF 4 INCH POLY ALONG HILL STREET IN WAXAHACHIE AND ABANDON DISTRICT REGULATOR STATION #04, 60 FEET OF 2 INCH POLY, 60 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY 1060 080.76440 (83,951) INSTALL DISTRICT REGULATOR STATION #18 AND 1,300 FEET OF 2 INCH POLY ALONG NE 36TH AND EAST MAIN IN GRAND PRAIRIE AND ABANDON DISTRICT REGULATOR STATION #18, 400 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY 1061 080.76451 (16,467) INSTALL 3,245 FEET OF 2 INCH POLY INTHE ALLEY OF CARRY IN DALLAS AND ABANDON 2,505 FEET OF 2 INCH, 710 FEET OF 3 INCH STEEL AND 30 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY MTX Retirements Page 31 of 45 531 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 1062 080.76458 (46,122) INSTALL 960 FEET OF 12 INCH POLY ALONG SOUTH 2ND STREET AND GURLEY IN WACO AND ABANDON 960 FEET OF 12 STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 1063 080.76461 (6,876) INSTALL 2,945 FEET OF 2 INCH POLY ALONG THE ALLEY OF WHIRLAWAY NEAR DALE CREST IN DALLAS AND ABANDON 2,600 FEET OF 2 INCH STEEL AND 345 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1064 080.76468 (5,337) INSTALL 175 FEET OF 2 INCH POLY ALONG FEATHERSTONE DRIVE AND ABANDON 110 FEET OF 2 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1065 080.76473 (11,554) INSTALL DISTRICT REGULATOR STATION #01 AND 30 FEET OF 2 INCH AND 100 FEET OF 4 INCH POLY ALONG WEST 2ND STREET AND NORTH MAIN STREET IN MUENSTER AND ABANDON DISTRICT REGULATOR STATION #01 AND 68 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MUENSTER SYSTEM INTEGRITY 1066 080.76478 (1,255) INSTALL 170 FEET OF 4 INCH AND ABANDON 170 FEET OF 2 INCH ALONG CEDARDALE ROAD IN DALLAS.ALL CUSTOMERS DALLAS SYSTEM IMPROVEMENT 1067 080.76481 (613) RELOCATE FACILITIES. INSTALL 80 FEET OF 2 INCH POLY ALONG CHERRY STREET AND ABANDON 80 FEET OF 2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY 1068 080.76483 (832) RELOCATE FACILITIES. INSTALL 225 FEET OF 2 INCH AND 725 FEET OF 4 INCH POLY ALONG CHRISTOPHER STREET AND ABANDON 200 FEET OF 2 INCH AND 700 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF EVERMAN STREET PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS EVERMAN SYSTEM INTEGRITY 1069 080.76490 (538) INSTALL 440 FEET OF 4 INCH POLY ALONG AVE A AND 10TH NE AND ABANDON 440 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY 1070 080.76491 (35,202) INSTALL LINE D GROUNDBED AND RECTIFIER AT 4911+17 AND ABANDON LINE D GROUNDBED AND RECTIFIER IN ARLINGTON, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY 1071 080.76496 (1,949) INSTALL 425 FEET OF 2 INCH POLY AND ABANDON 420 FEET OF 2 INCH STEEL ALONG SHILOH STREET IN GARLAND, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1072 080.76504 (13,528) RELOCATE FACILITIES. INSTALL 600 FEET OF 6 INCH POLY ALONG HARRIS RIDGE BOULEVARD AND JOHN HENRY FAULK DRIVE IN PFLUGERVILLE AND ABANDON 700 FEET OF 6 INCH POLY. ALL CUSTOMERS PFLUGERVILLE RELOCATION OF FACILITIES 1073 080.76508 (10,141) INSTALL 640 FEET OF 8 INCH POLY ALONG EDGEWOOD TERRACE AND ABANDON 640 FEET OF 8 INCH STEEL TO ACCOMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1074 080.76509 (6,143) INSTALL 850 FEET OF 2 INCH POLY ALONG SIMMONS DRIVE AND ABANDON 798 FEET OF 4 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY 1075 080.76510 (17,827) INSTALL 1,887 FEET OF 2 INCH, 1,013 FEET OF 4 INCH, 256 FEET OF 6 INCH POLY ALONG MAIN STREET IN MADISONVILLE AND ABANDON 264 FEET OF 4 INCH, 1,145 FEET OF 3 INCH, 869 FEET OF 2 INCH POLY AND 307 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY 1076 080.76511 (43,028) INSTALL 1,629 FEET OF 2 INCH, 1,150 FEET OF 6 INCH POLY ALONG MAIN STREET IN MADISONVILLE AND ABANDON 815 FEET OF 4 INCH, 1,095 FEET OF 2 INCH POLY AND 750 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY 1077 080.76513 (8,293) INSTALL 943 FEET OF 4 INCH, 2,689 FEET OF OF 2 INCH POLY. ABANDON 556 FEET OF 3 INCH, 1,303 FEET OF 2 INCH STEEL AND 263 FEET OF 3 INCH AND 756 FEET OF 2 INCH POLY ALONG MAY STREET IN MADISONVILLE, MADISON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY 1078 080.76514 (8,669) INSTALL 378 FEET OF 2 INCH, 98 FEET OF 4 INCH, 1,960 FEET OF 6 INCH POLY AND ABANDON 98 FEET OF 4 INCH POLY, 1.972 FEET OF 4 INCH STEEL ALONG MAIN STREET IN MADISONVILLE, MADISON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY 1079 080.76515 (12,758) INSTALL 2,032 FEET OF 2 INCH, 1,003 FEET OF 6 INCH POLY AND ABANDON 1,324 FEET OF 2 INCH, 526 FEET OF 4 INCH STEEL AND 406 FEET OF 2 INCH, 468 FEET OF 4 INCH POLY ALONG MAY STREET IN MADISONVILLE, MADISON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY 1080 080.76516 (5,700) INSTALL 420 FEET OF 2 INCH, 2,078 FEET OF 4 INCH POLY AND ABANDON 907 FEET OF 4 INCH, 523 FEET OF 3 INCH, 536 FEET OF 2 INCH STEEL AND 52 FEET OF 3 INCH 44 FEET OF 2 INCH POLY ALONG MAY STREET IN MADISONVILLE, MADISON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY 1081 080.76521 (3,163) INSTALL 380 FEET OF 4 INCH POLY ALONG THE STREETS OF COPPELL AND ABANDON 250 FEET OF 4 INCH POLY AND 130 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COPPELL SYSTEM INTEGRITY 1082 080.76522 (5,659) INSTALL 1,642 FEET OF 4 INCH ALONG NORTH 27TH STREET FROM PARK LAKE DRIVE TO EDNA AVENUE IN WACO ABANDON 1,512 FEET OF 2 INCH STEEL AND 125 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 1083 080.76523 (58,419) INSTALL 6 FEET OF 10 INCH STEEL ALONG STREETS IN ABILENE AND ABANDON 5 FEET OF 10 INCH STEEL.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 1084 080.76535 (441) INSTALL 280 FEET OF 2 INCH POLY ALONG CHANDLER AND DAY STREET AND ABANDON 283 FEET OF 3 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209.ALL CUSTOMERS DENISON SYSTEM INTEGRITY 1085 080.76538 (4,557) INSTALL 2,520 FEET OF 2 INCH POLY ALONG NORTH 29TH STREET FROM PARK LAKE DRIVE TO EDNA AVENUE IN WACO AND ABANDON 2,019 FEET OF 2 INCH STEEL, 135 FEET OF 2 INCH POLY, 299 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. OF 1.25 INCH POLY ALL CUSTOMERS WACO SYSTEM INTEGRITY 1086 080.76556 (3,570) INSTALL 2,435 FEET OF 2 INCH POLY ALONG NORTH 31ST STREET FROM PARK LAKE DRIVE TO EDNA AVENUE IN WACO AND ABANDON 521 FEET OF 2 INCH POLY, AND 1,924 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY 1087 080.76557 (47,605) INSTALL 1,500 FEET OF 2 INCH POLY ALONG MLK JR BOULEVARD, SOUTH YOUNG STREET, AND FIERSON STREET IN WAXAHACHIE AND ABANDON 110 FEET OF 3 INCH, 790 FEET OF 2 INCH STEEL, 600 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #05 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY 1088 080.76571 (120,012) INSTALL 20 FEET OF 8 INCH STEEL AT L20-2 STATION IN GEORGETOWN AND ABANDON SKID BUILT STATION IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY 1089 080.76575 (168,400) INSTALL 800 FEET OF 2 INCH POLY ALONG SOUTH DALLAS AVENUE AND PECAN STREET IN LANCASTER AND ABANDON 575 FEET OF 4 INCH POLY AND 130 FEET OF 4 INCH STEEL AND MAIN LINE REGULATOR #15 NEAR INTERSECTION OF SOUTH LANCASTER HUTCHINS ROAD AND NOKOMIS ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY 1090 080.76580 (11,061) INSTALL DISTRICT REGULATOR STATION #01 NORTH OF THE MITCHUM AND COLLEGE INTERSECTION, 50 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION #01, 198 FEET OF 3 INCH AND 47 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MALAKOFF SYSTEM INTEGRITY 1091 080.76582 (602) RELOCATE FACILITIES. INSTALL 2,200 FEET OF 6 INCH AND 20 FEET OF 4 INCH POLY ALONG WEST BAILEY BOSWELL ROAD IN FORT WORTH AND ABANDON 2,200 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITE OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1092 080.76587 (22,164) INSTALL 1,850 FEET OF 12 INCH POLY ALONG JENNINGS AVE AND ABANDON 5 FEET OF 12 INCH POLY IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1093 080.76590 (3,275) INSTALL 800 FEET OF 4 INCH, 300 FEET OF 2 INCH POLY ALONG SOUTH 31ST IN CORSICANA AND ABANDON 603 FEET OF 2 INCH, 580 FEET OF 3 INCH POLY AND 106 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY 1094 080.76591 (38,673) RELOCATE FACILITIES. INSTALL 1,571 FEET OF 6 INCH, 15 FEET OF 4 INCH POLY ALONG TURNER WARNELL ROAD AND ABANDON 873 FEET OF 6 INCH AND 789 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY MTX Retirements Page 32 of 45 532 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 1095 080.76598 (1,069) ABANDON 220 FEET OF 4 INCH STEEL AND 315 FEET OF 4 INCH POLY ALONG FIRST STREET AND LOUISE STREET IN COLLEGE STATION TO ACCOMMODATE REDEVELOPMENT.ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY 1096 080.76628 (6,341) INSTALL 2,975 FEET OF 2 INCH POLY ALONG THE STREETS OF GOLDTHWAITE AND ABANDON 315 FEET OF 2 INCH POLY AND 2,732 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GOLDTHWAITE SYSTEM INTEGRITY 1097 080.76633 (696) RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH AND 5 FEET OF 2 INCH POLY ALONG MULBERRY AND ABANDON 180 FEET OF 4 INCH AND 5 FEET OF 2 INCH POLY TO ACCOMODATE UNIVERSITY OF NORTH TEXAS PAVING PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY 1098 080.76638 (58,585) INSTALL DISTRICT REGULATOR STATION #23, 75 FEET OF 2 INCH AND 75 FEET OF 4 INCH POLY ALONG WOODS AND BIRGE STREETS IN SHERMAN AND ABANDON DISTRICT REGULATOR STATION #23 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY 1099 080.76644 (175,131) INSTALL 3,060 FEET OF 4 INCH AND 180 FEET OF 2 INCH POLY NEAR THE INTERSECTION OF GUS THOMASSON AND SHILOH IN DALLAS AND ABANDON 2,840 FEET OF 8 INCH, 25 FEET OF 6 INCH, 415 FEET OF 3 INCH AND 25 FEET OF 2 INCH STEEL AND 20 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1100 080.76650 (4,100) RELOCATE FACILITIES. INSTALL 1,050 FEET OF 4 INCH AND 365 FEET OF 2 INCH POLY ALONG SOUTH JUDKINS STREET AND ABANDON 1,420 FEET OF 4 INCH AND 190 FEET OF 2 INCH STEEL TO ACCOMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1101 080.76655 (1,743) RELOCATE FACILITIES. INSTALL 600 FEET OF 4 INCH POLY ALONG EAST BALTIMORE AVENUE TO ACCOMODATE CITY OF FORT WORTH STREET PROJECT AND ABADNON 570 FEET OF 4 INCH STEEL, 10 FEET OF 4 INCH POLY AND 20 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1102 080.76657 (68,513) INSTALL 2,460 FEET OF 4 INCH POLY BETWEEN SAN MEDINA AND GUS THOMASSON IN DALLAS AND ABANDON 2,460 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1103 080.76660 (29,097) INSTALL 2,765 FEET OF 2 INCH POLY AND ABANDON 2,765 FEET OF 3 INCH STEEL ALONG SAN MEDINA AND SAN PAULA IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1104 080.76661 (21,758) INSTALL 1,100 FEET OF 2 INCH AND 600 FEET OF 4 INCH POLY AND ABANDON 174 FEET OF 4 INCH, 310 FEET OF 6 INCH, 742 FEET OF 3 INCH, 350 FEET OF 2 INCH STEEL AND 190 FEET OF 6 INCH 100 FEET OF 2 INCH POLY ALONG WITH DISTRICT REGULATOR STATION 02 LOCATED ON AVE 3 AND EAST 3RD IN BURKBURNETT, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURKBURNETT SYSTEM INTEGRITY 1105 080.76662 (2,089) INSTALL DISTRICT REGULATOR STATION #13 ALONG 4TH STREET NORTHWEST AND AVENUE C NORTHWEST IN CHILDRESS AND ABANDON DISTRICT REGULATOR STATION #13 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY 1106 080.76666 (23,563) INSTALL 1,548 FEET OF 2 INCH POLY ALONG NORTH THOMPSON STREET, CRAIG STREET IN HILLSBORO AND ABANDON 769 FEET OF 2 INCH, 350 FEET OF 4 INCH STEEL AND 415 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 1107 080.76672 (2,227) INSTALL DISTRICT REGULATOR STATION #03, 65 FEET OF 4 INCH AND 30 FEET OF 6 INCH POLY ALONG MAIDEN STREET AND ABANDON DISTRICT REGULATOR STATION #03. 15 FEET OF 3 INCH, 15 FEET OF 6 INCH STEEL AND 80 FEET OF 3 INCH, 40 FEET OF 4 INCH, AND 20 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS VERNON SYSTEM INTEGRITY 1108 080.76673 (4,229) INSTALL DISTRICT REGULATOR STATION #04 AND 185 FEET OF 4 INCH AND 30 FEET OF 4 INCH POLY ALONG TOLAR AND WICHITA STREET IN VERNON AND ABANDON DISTRICT REGULATOR STATION #04 AND 90 FEET OF 3 INCH AND 80 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY 1109 080.76680 (3,230) INSTALL DISTRICT REGULATOR STATION DRS015 AND 35 FEET OF 2 INCH 50 FEET OF 6 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS015 AND 60 FEET OF 2 INCH, 105 FEET OF 6 INCH STEEL AND 5 FEET OF 6 INCH POLY ALONG GRANT STREET IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1110 080.76681 (2,239) INSTALL 110 FEET OF 2 INCH, 485 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION DRS025 AND ABANDON DISTRICT REGULATOR STATION DRS025 AND 297 FEET OF 3 INCH POLY AND 17 FEET OF 3 INCH, 12 FEET OF 4 INCH, AND 18 FEET OF 6 INCH STEEL ALONG GALVESTON STREET IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1111 080.76682 (229,342) INSTALL 2,104 FEET OF 4 INCH POLY ALONG THE STREETS OF FORT WORTH AND ABANDON 15 FEET OF 8 INCH, 560 FEET OF 6 INCH, 98 FEET OF 4 INCH STEEL AND 240 FEET OF 6 INCH, 1,735 FEET OF 4 INCH, 635 FEET OF 2 INCH POLY AND 2 DISTRICT REGULATOR STATIONS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1112 080.76684 (2,692) INSTALL DISTRICT REGULATOR STATION DRS64 AND 325 FEET OF 4 INCH, 325 FEET OF 6 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS64 AND 21 FEET OF 4 INCH AND 25 FEET OF 6 INCH STEEL ALONG HARRISON STREET IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1113 080.76686 (3,701) INSTALL DISTRICT REGULATOR STATION DRS118 AND 445 FEET OF 2 INCH, 365 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS118 AND 27 FEET OF 2 INCH POLY, 18 FEET OF 2 INCH, 9 FEET OF 3 INCH, AND 34 FEET OF 4 INCH STEEL IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1114 080.76695 (971,515) INSTALL MOTORIZED REGULATORS AND ABANDON MOTORIZED REGULATORS ACROSS THE MDTX SYSTEM FOR 45 LOCATIONS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY 1115 080.76697 (161,320) REPLACE DISTRIBUTION MOTORIZED REGULATORS IN 95 LOCATIONS ACROSS THE MDTX SYSTEM IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY 1116 080.76711 (377) ABANDON 25 FEET OF 8 INCH POLY ALONG WENDLAND ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY 1117 080.76713 (10,458) RELOCATE FACILITIES. INSTALL 119 FEET OF 2 INCH, 2,481 FEET OF 4 INCH POLY AND ABANDON 1,267 FEET OF 3 INCH, 580 FEET OF 4 INCH POLY AND 133 FEET OF 2 INCH, 518 FEET OF 4 INCH STEEL IN CAMERON, MILAM COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY 1118 080.76714 (12,703) ABANDON METER TUBE GAP CONTROLLERS AT GENERAL MOTORS ASSEMBLY PLANT AND FOSTER FORBES LOCATIONS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 1119 080.76724 (721) RELOCATE FACILITIES. INSTALL 177 FEET OF 2 INCH POLY ALONG FM 1417 TO ACCOMMODATE TXDOT WIDENING PROJECT AND ABANDON 150 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY 1120 080.76726 (954) ABANDON 127 FEET OF 2 INCH STEEL AND 250 FEET OF 2 INCH POLY ALONG HIGHWAY 79 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1121 080.76731 (66,105) INSTALL 2,675 FEET OF 2 INCH AND 80 FEET OF 8 INCH POLY ALONG STEPHANIE DRIVE AND ABANDON 2,675 FEET OF 3 INCH AND 80 FEET OF 8 INCH STEEL IN HALTOM CITY, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY 1122 080.76733 (1,793) ABANDON 595 FEET OF 2 INCH STEEL AND 13 FEET OF 2 INCH POLY ALONG JOHNSON AND PRINCE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY 1123 080.76738 (395) INSTALL 230 FEET OF 4 INCH POLY ALONG WHEELER AND ABANDON 210 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY 1124 080.76752 (242) INSTALL 130 FEET OF 4 INCH POLY ALONG NELSON AND ROBERTS AND ABANDON 125 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BOWIE SYSTEM INTEGRITY 1125 080.76771 (638) INSTALL 330 FEET OF 4 INCH POLY ALONG 4TH STREET SOUTHWEST AND ABANDON 309 FEET OF 3 INCH STEEL, 17 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY 1126 080.76776 (1,768) RELOCATE FACILITIES. INSTALL 122 FEET OF 6 INCH POLY ALONG MORNINGSTAR BOULEVARD AND STELLAR WIND DIRVE AND ABANDON 55 FEET OF 6 INCH POLY ALL CUSTOMERS GEORGETOWN RELOCATION OF FACILITIES MTX Retirements Page 33 of 45 533 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 1127 080.76778 (196) RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH POLY ALONG TURTLE COVE STREET IN ROCKWALL AND ABANDON 190 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY 1128 080.76793 (315) INSTALL 50 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 45 FEET OF 2 INCH STEEL AND 5 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS YANTIS SYSTEM INTEGRITY 1129 080.76794 (1,398) RELOCATE FACILITIES. INSTALL 330 FEET OF 6 INCH POLY ALONG LIVE OAK STREET IN COMMERCE AND ABANDON 330 FEET OF 6 INCH STEEL. DEVELOPER INSTALLED FACILITIES.ALL CUSTOMERS COMMERCE RELOCATION OF FACILITIES 1130 080.76799 (99,760) INSTALL 965 FEET OF 2 INCH, 1,137 FEET OF 4 INCH AND ABANDON 424 FEET OF 3 INCH, 350 FEET OF 2 INCH STEEL, 51 FEET OF 4 INCH AND 770 FEET OF 8 INCH STEEL AND 106 FEET OF 4 INCH, 70 FEET OF 1.25 INCH, 436 FEET OF 2 INCH, 903 FEET OF 3 INCH, 821 FEET OF 6 INCH AND 70 FEET OF 8 INCH POLY AND DISTRICT REGULATOR STATION #10 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY 1131 080.76808 (2,707) RELOCATE FACILITIES. INSTALL 1,285 FEET OF 4 INCH AND 176 FEET OF 2 INCH POLY ALONG BULLDOG STADIUM DRIVE AND THIRD STREET IN BURNET AND ABANDON 850 FEET OF 4 INCH POLY.ALL CUSTOMERS BURNET RELOCATION OF FACILITIES 1132 080.76814 (17,888) RELOCATE FACILITIES. INSTALL 850 FEET OF 2 INCH AND 1,400 FEET OF 6 INCH POLY ALONG MERRITT STREET IN RIVER OAKS AND ABANDON 1,400 FEET OF 2 INCH AND 575 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY 1133 080.76819 (9,097) INSTALL 890 FEET OF 2 INCH POLY ALONG RITA AND CLIFF IN GARLAND AND ABANDON 880 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1134 080.76823 (5,104) INSTALL 150 FEET OF 6 INCH POLY AND 50 FEET OF 2 INCH POLY ALONG MILAM & PRESTON STREETS AND ABANDON 150 FEET OF 6 INCH AND 50 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY 1135 080.76826 (485) REPLACE OUTLET LEG OF DISTRICT REGULATOR STATION DFW#06. INSTALL 7 FEET OF 4 INCH STEEL AND ABANDON 7 FEET OF 2 INCH STEEL AT DFW AIRPORT IN GRAPEVINE. ALL CUSTOMERS GRAPEVINE SYSTEM IMPROVEMENT 1136 080.76831 (49,465) INSTALL 160 FEET OF 12 INCH, 25 FEET OF 2 INCH AND 20 FEET OF 6 INCH POLY ALONG HIGHWAY 277 AND ABANDON 150 FEET OF 10 INCH AND 15 FEET OF 6 INCH STEEL AND 20 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 1137 080.76833 (158,456) ABANDON 273 FEET OF 12 INCH STEEL ALONG STREETS OF MELISSA. ALL CUSTOMERS MELISSA SYSTEM INTEGRITY 1138 080.76835 (16,737) INSTALL 2,550 FEET OF 4 INCH POLY ALONG THE STREETS OF DALLAS AND ABANDON 2,350 FEET OF 4 INCH STEEL, 200 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1139 080.76841 (9,881) INSTALL 50 FEET OF 2 INCH AND 1,515 FEET OF 4 INCH POLY ALONG NORTH WASHINGTON STREET AND MAPLE STREET IN FARMERSVILLE, COLLIN COUNTY AND ABANDON 1,350 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY 1140 080.76842 (11,002) INSTALL 125 FEET OF 2 INCH AND 1,365 FEET OF 4 INCH POLY ALONG NORTH WASHINGTON STREET AT HALE STREET IN FARMERSVILLE AND ABANDON 326 FEET OF 3 INCH POLY AND 1,094 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY 1141 080.76846 (28,552) INSTALL 755 FEET OF 6 INCH POLY ALONG HIGHWAY 281 IN MARBLE FALLS AND ABANDON 854 FEET OF 6 INCH POLY. ALL CUSTOMERS MARBLE FALLS RELOCATION OF FACILITIES 1142 080.76848 (684) INSTALL 5 FEET OF 8 INCH POLY ALONG GREAT OAKS DRIVE IN BRUSHY CREEK AND ABANDON 8 FEET OF 8 INCH POLY. ALL CUSTOMERS BRUSHY CREEK SYSTEM INTEGRITY 1143 080.76858 (12,537) RELOCATE FACILITIES. INSTALL 355 FEET OF 6 INCH ALONG GREENVILLE AVENUE IN ALLEN AND ABANDON 346 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF ALLEN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN SYSTEM INTEGRITY 1144 080.76862 (2,176) INSTALL 200 FEET OF 12 INCH STEEL AND ABANDON 200 FEET OF 12 INCH STEEL ALONG FM 1417 IN SHERMAN, GRAYSON COUNTY. ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES 1145 080.76864 (25,092) INSTALL 4,095 FEET OF 4 INCH POLY ALONG BURLINGTON ROAD BETWEEN MINTON ROAD AND EAST MCLEROY BOULEVARD IN SAGINAW AND ABANDON 3,920 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY 1146 080.76867 (5,644) INSTALL GROUNDBED ON L14-1(2ND) IN TEMPLE AND ABANDON GROUNDBED ON L14- 1(2ND) IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY 1147 080.76873 (13,160) INSTALL 1,075 FEET OF 4 INCH POLY ALONG COLD SPRINGS ROAD TO ACCOMODATE CITY OF FORT WORTH STREETS PROJECT AND ABANDON 827 FEET OF 4 INCH STEEL AND 300 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1148 080.76888 (152,111) INSTALL 793 FEET OF 6 INCH, 61 FEET OF 4 INCH AND 145 FEET OF 2 INCH POLY ALONG NEW YORK AVENUE AND GLYNN PARKS DRIVE IN ARLINGTON AND ABANDON 765 FEET OF 6 INCH STEEL AND 100 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 1149 080.76889 (21,474) INSTALL 1,548 FEET OF 4 INCH POLY ALONG LOVERS LANE IN ARLINGTON, TARRANT COUNTY AND ABANDON 1,550 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 1150 080.76890 (34,133) INSTALL 1,413 FEET OF 4 INCH POLY ALONG LOVERS LANE AND DANIEL DRIVE IN ARLINGTON AND ABANDON 1,335 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 1151 080.76891 (17,889) INSTALL 1,357 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY ALONG LOVERS LANE IN ARLINGTON AND ABANDON 1,350 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 1152 080.76892 (15,117) INSTALL 1,056 FEET OF 4 INCH AND 309 FEET OF 2 INCH POLY ALONG LOVERS LANE IN ARLINGTON, TARRANT COUNTY AND ABANDON 1,050 FEET OF 4 INCH, 145 FEET OF 1.25 INCH STEEL AND 15 FEET OF 4 INCH, 20 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 1153 080.76893 (31,656) INSTALL 1,038 FEET OF 4 INCH AND 255 FEET OF 2 INCH POLY ALONG GLYNN OAKS DRIVE IN ARLINGTON AND ABANDON 1,025 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 1154 080.76894 (18,350) INSTALL 1,360 FEET OF 4 INCH AND 11 FEET OF 2 INCH POLY ALONG GLYNN OAKS DRIVE IN ARLINGTON, TARRANT COUNTY AND ABANDON 1.365 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 1155 080.76895 (42,961) INSTALL 1,502 FEET OF 2 INCH POLY AND ABANDON 625 FEET OF 4 INCH AND 220 FEET OF 2 INCH STEEL ALONG RAYBORN DRIVE IN ARLINGTON, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 1156 080.76897 (22,446) INSTALL 1,551 FEET OF 2 INCH POLY AND ABANDON IN 1,540 FEET OF 4 INCH STEEL ALONG TUCKER BOULEVARD IN ARLINGTON, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 1157 080.76898 (52,785) INSTALL 1,533 FEET OF 4 INCH POLY AND ABANDON 1,510 FEET OF 4 INCH STEEL ALONG GLYNN OAKS DRIVE IN ARLINGTON, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 1158 080.76899 (119,176) INSTALL 995 FEET OF 4 INCH 335 FEET OF 2 INCH POLY AND ABANDON 940 FEET OF 4 INCH STEEL ALONG BROWNING DRIVE IN ARLINGTON, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 1159 080.76908 (52,246) INSTALL 209 SUSL ALONG STREETS OF BURNETT AND ABANDON 209 SUSL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURNET SYSTEM INTEGRITY 1160 080.76912 (251,260) RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH AND 1,275 FEET OF 6 INCH POLY ALONG ROBERTS CUT OFF ROAD TO ACCOMMODATE CITY OF RIVER OAKS STREET PROJECT IN RIVER OAKS AND ABANDON 150 FEET OF 3 INCH, 150 FEET OF 4 INCH STEEL, AND 185 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY 1161 080.76913 (27,034) INSTALL 805 FEET OF 4 INCH, 3,070 FEET OF 2 INCH POLY ALONG HARLINGEN STREET FROM ODESSA STREET NORTH IN DALLAS AND ABANDON 495 FEET OF 6 INCH, 1,405 FEET OF 3 INCH, 1,660 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1162 080.76915 (329,280) RELOCATE FACILITIES. INSTALL 4,050 FEET OF 4 INCH POLY ALONG LONG AVENUE TO ACCOMMODATE CITY OF RIVER OAKS STREET PROJECT AND ABANDON 55 FEET OF 2 INCH, 355 FEET OF 3 INCH, AND 3,175 OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY MTX Retirements Page 34 of 45 534 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 1163 080.76925 (3,634) INSTALL 550 FEET OF 4 INCH POLY ALONG BUTTERNUT STREET AND ABANDON 357 FEET OF 4 INCH STEEL AND 156 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 1164 080.76929 (1,739) INSTALL 600 FEET OF 2 INCH POLY ALONG HATCH ROAD TO ACCOMODATE TARRANT COUNTY STREET PROJECT AND ABANDON 603 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1165 080.76937 (12,265) RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY ALONG CHAFFIN DRIVE IN RICHLAND HILLS AND ABANDON 385 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS SYSTEM INTEGRITY 1166 080.76948 (1,420) ABANDON 404 FEET OF 1.25 INCH POLY ALONG STONEBRIDGE COURT. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 1167 080.76951 (6,653) INSTALL 1,000 FEET OF 4 INCH POLY ALONG SHILOH ALLEY IN DALLAS AND ABANDON 1,000 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1168 080.76964 (706) INSTALL 100 FEET OF 2 INCH POLY ALONG GLENVILLE DRIVE AND INTERNATIONAL PARKWAY AND ABANDON 100 FEET OF 2 INCH POLY IN RICHARDSON, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY 1169 080.76965 (54,526) RELOCATE FACILITIES. INSTALL 700 FEET OF 4 INCH POLY ALONG WEATHERRED DRIVE IN RICHARDSON AND ABANDON 700 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY 1170 080.76978 (441) RELOCATE FACILITIES INSTALL 950 FEET OF 4 INCH POLY ALONG THE STREETS OF GRAPEVINE AND ABANDON 402 FEET OF 3 INCH, 467 FEET OF 4 INCH STEEL AND 264 FEET OF 3 INCH AND 115 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF GRAPEVINE STREETS PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY 1171 080.76983 (30,779) INSTALL 1,600 FEET OF 6 INCH POLY AND ABANDON 1,600 FEET OF 6 INCH BARE STEEL ALONG VAUGHN BOULEVARD IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1172 080.76988 (881) INSTALL 50 FEET OF 2 INCH POLY AND ABANDON 100 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION #21 IN STAMFORD ALONG EAST VANDERBILT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY 1173 080.76989 (657) INSTALL 40 FEET OF 2 INCH POLY ALONG TOMIE STREET AND ABANDON 20 FEET OF 2 IN POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUITMAN SYSTEM INTEGRITY 1174 080.76992 (3,828) INSTALL 200 FEET OF 6 INCH POLY ALONG HILLCREST ROAD AND OHIO DRIVE IN FRISCO AND ABANDON 139 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FRISCO SYSTEM INTEGRITY 1175 080.76993 (3,746) INSTALL 755 FEET OF 2 INCH POLY ALONG THE STREETS OF STEPHENVILLE AND ABANDON 246 FEET OF 2 INCH AND 84 FEET OF 4 INCH POLY AND 113 FEET OF 2 INCH, 243 FEET OF 4 INCH, 6 FEET OF 6 INCH AND 686 FEET OF 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY 1176 080.76998 (55,680) INSTALL 1,335 FEET OF 2 INCH AND 3,270 FEET OF 4 INCH POLY ALONG FERGUSON ROAD IN DALLAS AND ABANDON 20 FEET OF 2 INCH, 690 FEET OF 3 INCH, 1,770 FEET OF 4 INCH AND 3,100 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1177 080.77000 (1,867) INSTALL 850 FEET OF 2 INCH POLY ALONG OLD NOVICE ROAD IN PARIS AND ABANDON 850 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS PARIS SYSTEM INTEGRITY 1178 080.77012 (12,741) INSTALL DISTRICT REGULATOR STATION #09 AND 110 OF 2 INCH, 10 FEET OF 4 INCH AND 1,090 FEET OF 6 INCH POLY ALONG MARKET SQUARE STREET AND FRANCHER STREET IN HILLSBORO AND ABANDON DISTRICT REGULATOR STATION #09, 163 FEET OF 4 INCH , 452 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 1179 080.77013 (3,314) ABANDON 645 FEET OF 4 INCH STEEL ALONG BLADE STREET IN GREENVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY 1180 080.77026 (6) INSTALL 5 FEET OF 2 INCH POLY ALONG WAYSIDE IN PILOT POINT AND ABANDON 5 FEET OF 2 INCH POLY.ALL CUSTOMERS PILOT POINT RELOCATION OF FACILITIES 1181 080.77031 (9,535) INSTALL 950 FEET OF 2 INCH POLY ALONG LEONA AVENUE IN DALLAS AND ABANDON 950 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1182 080.77038 (16,535) ABANDON 670 FEET OF 3/4 INCH, 72 FEET OF 1.25 INCH STEEL, 699 FEET OF 1.25 POLY ALONG THE STREETS OF CARBON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CARBON SYSTEM INTEGRITY 1183 080.77039 (4,353) INSTALL 3,160 FEET OF 6 INCH POLY ALONG RAY DRIVE AND JUANITA DRIVE IN DENISON AND ABANDON 3,320 FEET OF 2 INCH STEEL AND 99 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY 1184 080.77041 (12) INSTALL 5 FEET OF 2 INCH POLY ALONG HOLIDAY STREET IN PILOT POINT AND ABANDON 5 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS PILOT POINT SYSTEM INTEGRITY 1185 080.77042 (11,164) INSTALL 1,290 FEET OF 6 INCH POLY ALONG MARY LAKE DRIVE IN BRYAN AND ABANDON 1,290 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY 1186 080.77043 (965) INSTALL DISTRICT REGULATOR STATION DRS01, 90 FEET OF 3 INCH AND 60 FEET OF 4 INCH POLY AND ABANDON REGULATOR STATION, 60 FEET OF 3 INCH, 20 FEET OF 2 INCH POLY AND 20 FEET OF 2 INCH, AND 20 FEET OF 4 INCH STEEL IN OGLESBY, CORYELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OGLESBY SYSTEM INTEGRITY 1187 080.77046 (8,599) INSTALL 1,050 FEET OF 2 INCH, 80 FEET OF 4 INCH POLY ALONG AVENUE A AND AVENUE E IN ENNIS AND ABANDON 400 FEET OF 2 INCH STEEL AND 650 FEET OF 2 INCH, 80 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY 1188 080.77048 (9,720) RELOCATE FACILITIES. INSTALL 860 FEET OF 4 INCH POLY ALONG SADDLE TRAIL TO ACCOMMODATE TARRANT COUNTY STREET PROJECT AND ABANDON 842 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY 1189 080.77049 (16,957) INSTALL 910 FEET OF 2 INCH, 550 FEET OF 4 INCH POLY ALONG PIMLICO WAY AND ABANDON 1,158 FEET OF 2 INCH, 200 FEET OF 3 INCH STEEL IN SAGINAW, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY 1190 080.77051 (126,356) INSTALL 350 FEET OF 6 INCH AND 6,750 FEET OF 12 INCH STEEL ALONG HK DODGEN LOOP IN TEMPLE AND ABANDON 6,700 FEET OF 6 INCH STEEL ALL CUSTOMERS TEMPLE SYSTEM IMPROVEMENT 1191 080.77054 (25,828) INSTALL DISTRICT REGULATOR STATION #01, 50 FEET OF 2 INCH AND 25 FEET OF 4 INCH POLY ALONG COLLEGE STREET BETWEEN GALLOWAY AND BRYAN IN MESQUITE AND ABANDON DISTRICT REGULATOR STATION #01, 50 FEET OF 2 INCH AND 25 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY 1192 080.77055 (3,332) RELOCATE FACILITIES. INSTALL 65 FEET OF 2 INCH POLY ALONG SOUTH WILSON STREET AND ABANDON 280 FEET OF 4 INCH POLY TO ACCOMODATE THE CITY OF BURLESON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY 1193 080.77057 (11,661) MODIFY DISTRICT REGULATOR STATION DRS04 WITH A NEW RELIEF VALVE STACK. ABANDON WORKER MONITOR SETUP AND INSTALL 2 INCH 289P RELIEF VALVE WITH RELIEF VALVE SPOOL. ABANDON 2 INCH FISHER 243 MONITOR REGULATOR IN BELMEADE, MCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BELLMEAD SYSTEM INTEGRITY 1194 080.77058 (6,532) INSTALL GARLAND DISTRICT REGULATOR STATION DRS11, 40 FEET OF 2 INCH, 30 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS11, 40 FEET OF 2 INCH POLY, AND 25 FEET OF 4 INCH STEEL IN GARLAND, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1195 080.77062 (27,243) INSTALL DISTRICT REGULATOR STATION DRS01 AND ABANDON DISTRICT REGULATOR STATION DRS01 IN WHITNEY, HILL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITNEY SYSTEM INTEGRITY 1196 080.77064 (46,034) INSTALL DISTRICT REGULATOR STATION #05, 25 FEET OF 2 INCH AND 20 FEET OF 4 INCH POLY SOUTH LOCUST STREET AND WEST GROSS STREET IN MESQUITE AND ABANDON DISTRICT REGULATOR STATION #05, 45 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY 1197 080.77069 (965) INSTALL 310 FEET OF 6 INCH POLY ALONG WEST TRAVIS STREET AND 120 FEET OF 2 INCH POLY ALONG NORTH MILAM STREET IN KERRVILLE AND ABANDON 290 FEET OF 6 INCH STEEL AND 120 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG SYSTEM INTEGRITY MTX Retirements Page 35 of 45 535 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 1198 080.77073 (244) INSTALL DISTRICT REGULATOR STATION #17, 25 FEET OF 2 INCH AND 30 FEET OF 4 INCH POLY ALONG NORTH SIDE OF KAUFMAN STREET AND AVENUE A IN SEAGOVILLE AND ABANDON DISTRICT REGULATOR STATION #17 AND 55 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEAGOVILLE SYSTEM INTEGRITY 1199 080.77078 (5,152) RELOCATE FACILITIES. INSTALL 2,625 FEET OF 2 INCH POLY ALONG WILLIAM SPRINGS ROAD IN LAKE WORTH TO ACCOMMODATE TARRANT COUNTY STREET PROJECT AND ABANDON 2,908 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH SYSTEM INTEGRITY 1200 080.77080 (465) INSTALL 440 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 440 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLANKET SYSTEM INTEGRITY 1201 080.77086 (1,137) INSTALL 420 FEET OF 2 INCH POLY ALONG LAMAR STREET IN MERKEL AND ABANDON 520 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS MERKEL SYSTEM INTEGRITY 1202 080.77087 (153) INSTALL 50 FEET OF POLY ALONG 30TH STREET IN SNYDER AND ABANDON 1.25 INCH SERVICE LINE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY 1203 080.77091 (7,669) INSTALL 720 FEET OF 4 INCH AND 230 FEET OF 2 INCH POLY ALONG EAST GRAND IN COMANCHE AND ABANDON 229 FEET OF 2 INCH AND 510 FEET OF 4 INCH POLY AND 524 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY 1204 080.77110 (6,613) INSTALL 35 FEET OF 2 INCH, 20 FEET OF 6 INCH, 35 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #03 ALONG AVENUE J NORTH OF 12 STREET IN CISCO AND ABANDON 10 FEET OF 6 INCH , 5 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION #03 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY 1205 080.77111 (15,235) INSTALL 1,960 FEET OF 8 INCH POLY ALONG LEMMON AVENUE AND SHORECREST IN DALLAS AND ABANDON 2,060 FEET OF 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1206 080.77113 (14,992) INSTALL 1,300 FEET OF 2 INCH POLY ALONG FORD STREET ALLEY FROM EAST AVENUE D TO CARVER STREET IN GARLAND AND ABANDON 630 FEET OF 4 INCH STEEL AND 370 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1207 080.77114 (5,191) INSTALL 1,650 FEET OF 2 INCH POLY ALONG CLARK STREET ALLEY FROM CARVER DRIVE AND E. AVENUE D IN GARLAND AND ABANDON 1,080 FEET OF 4 INCH STEEL AND 340 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1208 080.77156 (9,746) RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH POLY ALONG HACKAMORE STREET IN WHITE SETTLEMENT AND ABANDON 15 FEET OF 2 INCH STEEL AND 115 FEET OF 2 INCH POLY.ALL CUSTOMERS WHITE SETTLEMENT RELOCATION OF FACILITIES 1209 080.77167 (147,182) INSTALL 1,700 FEET OF 8 INCH POLY AND ABANDON 1,255 FEET OF 8 INCH STEEL ALONG THE STREETS OF DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1210 080.77198 (71,815) INSTALL DISTRICT REGULATOR STATION #01, 25 FEET OF 4 INCH POLY ALONG WEST MARKET STREET AND 2ND STREET IN MABANK AND ABANDON DISTRICT REGULATOR STATION #01, 27 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MABANK SYSTEM INTEGRITY 1211 080.77208 (4,397) RELOCATE FACILITIES. INSTALL 304 FEET OF 2 INCH POLY ALONG MAGNOLIA PARK DRIVE IN RICHLAND HILLS AND ABANDON 292 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS SYSTEM INTEGRITY 1212 080.77217 (1,605) INSTALL 900 FEET OF 6 INCH, 20 FEET OF 4 INCH POLY ALONG TRAIL LAKE DRIVE IN FORT WORTH AND ABANDON 900 FEET OF 6 INCH AND 650 FEET OF 2 INCH STEEL AND 20 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1213 080.77218 (4,730) INSTALL 1,600 FEET OF 4 INCH POLY ALONG WEST SPURGEON FROM TRAIL LAKE DRIVE TO BILGADE AVENUE IN FORT WORTH AND ABANDON 1,600 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1214 080.77219 (4,382) INSTALL 1,365 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY ALONG WEST SPURGEON STREET FROM BILGLADE ROAD TO WEST DEAD END IN FORT WORTH AND ABANDON 1,300 FEET OF 4 INCH, 50 FEET OF 3 INCH STEEL AND 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1215 080.77220 (3,646) INSTALL 1,050 FEET OF 2 INCH POLY ALONG SOUTH RIDGE TERRACE IN FORT WORTH AND ABANDON 650 FEET OF 2 INCH POLY AND 400 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1216 080.77224 (7,386) RELOCATE FACILITIES. INSTALL 1,600 FEET OF 2 INCH POLY ALONG LONG STREET IN STEPHENVILLE AND ABANDON 473 FEET OF 2 INCH, 38 FEET OF 3 INCH AND 407 FEET OF 4 INCH POLY AND 969 FEET OF 2 INCH AND 425 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF STEPHENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY 1217 080.77263 (4,582) INSTALL 1,560 FEET OF 2 INCH POLY ALONG CORNISH AVENUE IN FORT WORTH AND ABANDON 1,560 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1218 080.77264 (7,097) INSTALL 1,585 FEET OF 4 INCH POLY ALONG STAPLES AVENUE FROM SW LOOP 820 TO BILGLADE ROAD IN FORT WORTH AND ABANDON 1,585 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1219 080.77265 (2,577) INSTALL 800 FEET OF 2 INCH POLY ALONG WILLOMET AVENUE IN FORT WORTH AND ABANDON 700 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1220 080.77267 (8,442) INSTALL 2,200 FEET OF 6 INCH AND 300 FEET OF 4 INCH POLY ALONG THE STREETS OF FORT WORTH, TARRANT COUNTY AND ABANDON 900 FEET OF 4 INCH AND 1,600 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1221 080.77282 (661) INSTALL 450 FEET OF 4 INCH POLY ALONG WEST KING STREET IN BURLESON AND ABANDON 260 FEET OF 4 INCH AND 150 FEET OF 2 INCH STEEL AND 50 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY 1222 080.77288 (162) INSTALL 220 FEET OF 2 INCH POLY ALONG ESTES PARKWAY SOUTH OF I-20 INTERSECTION IN LONGVIEW AND ABANDON 220 FEET OF 2 INCH STEEL. ALL CUSTOMERS LONGVIEW RELOCATION OF FACILITIES 1223 080.77291 (2,688) INSTALL 775 FEET OF 4 INCH POLY ALONG 4TH STREET AND 350 FEET OF 2 INCH POLY ALONG MARKET STREET IN HONEY GROVE AND ABANDON 770 FEET OF 4 INCH AND 345 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HONEY GROVE SYSTEM INTEGRITY 1224 080.77294 (42,607) INSTALL 1,510 FEET OF 4 INCH AND 30 FEET OF 2 INCH POLY ALONG WEST JEFFERSON BOULEVARD AND CALUMET AVENUE IN DALLAS AND ABANDON 1,505 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1225 080.77296 (32,841) INSTALL 1,660 FEET OF 2 INCH POLY AND ABANDON 1,195 FEET OF 4 INCH AND 1,695 FEET OF 2 INCH POLY ALONG VIA ESTRELLA AND VIA JAMES JACOB IN DALLAS, DALLAD COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1226 080.77297 (7,616) INSTALL 3,745 FEET OF 2 INCH POLY AND ABANDON 3,605 FEET OF 2 INCH STEEL, 50 FEET OF 4 INCH, 70 FEET OF 2 INCH, AND 90 FEET OF 1.25 FEET OF POLY ALONG JEFFERSON BOULEVARD AND CALUMET AVENUE IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1227 080.77305 (357,149) INSTALL 2,700 FEET OF 2 INCH POLY ALONG NE STREET AND NORTH ELM STREET IN FORT WORTH AND ABANDON DISTRICT REGULATOR STATION #217 AND 70 FEET OF 6 INCH, 35 FEET OF 2 INCH, 2,600 FEET OF 12 INCH STEEL AND 20 FEET OF 4 INCH, 10 FEET OF 2 INCH, 350 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1228 080.77311 (10,374) RELOCATE FACILITIES. INSTALL 1,650 FEET OF 2 INCH POLY ALONG SOUTHWEST JOHNSON TO ACCOMMODATE CITY OF BURLESON STREET PROJECT AND ABANDON 1,650 FEET OF 2 INCH POLY AND 270 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY 1229 080.77319 (26,006) RELOCATE FACILITIES. INSTALL 450 FEET OF 6 INCH POLY ALONG HERITAGE TRACE PARKWAY AND ABANDON 450 FEET OF 6 INCH POLY TO ACCOMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY MTX Retirements Page 36 of 45 536 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 1230 080.77322 (1,218) INSTALL 450 FEET OF 2 INCH POLY ALONG ENFIELD STREET IN BRYAN AND ABANDON 450 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY 1231 080.77328 (7,037) INSTALL 2,400 FEET OF 4 INCH AND 300 FEET OF 2 INCH POLY ALONG JEFFERSON STREET IN SULPHUR SPRINGS AND ABANDON 190 FEET OF 4 INCH POLY, 285 FEET OF 3 INCH, 1,900 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY 1232 080.77341 (5,951) INSTALL 1,500 FEET OF 2 INCH POLY ALONG WALDRON AVENUE AND BILGLADE ROAD IN FORT WORTH AND ABANDON 1,425 FEET OF 2 INCH STEEL AND 75 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1233 080.77348 (4,090) INSTALL 900 FEET OF 2 INCH POLY ALONG LOWELL LANE IN FORT WORTH AND ABANDON 900 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1234 080.77351 (3,493) ISNTALL 250 FEET OF 4 INCH POLY ALONG NOLAN RIDGE DRIVE IN CLEBURNE AND ABANDON 250 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY 1235 080.77352 (10,664) INSTALL RELIEF VALVE ON POTTSBORO CITY GATE AND ABANDON RELIEF VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS POTTSBORO SYSTEM INTEGRITY 1236 080.77357 (3,852) INSTALL 900 FEET OF 4 INCH AND 320 FEET OF 2 INCH POLY ALONG STAPLES AVENUE FROM BILGLADE ROAD TO LOWELL LANE AND ABANDON 900 FEET OF 2 INCH POLY AND 250 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1237 080.77371 (422) ABANDON 433 FEET OF 2 INCH STEEL ALONG THE STREETS OF NORTH RICHLAND HILLS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS NORTH RICHLAND HILLS SYSTEM INTEGRITY 1238 080.77374 (1,680) ABANDON 970 FEET OF 2 INCH POLY ALONG THE STREETS OF JASMINE HILLS IN RICHARDSON DUE TO MAIN BEING INSTALLED OUT OF EASEMENT BY DEVELOPER. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY 1239 080.77383 (42,050) INSTALL 30 FEET OF 20 INCH STEEL ON LINE D IN DALLAS AND ABANDON 30 FEET OF 20 INCH STEEL.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1240 080.77384 (3,935) INSTALL 3,128 FEET OF 2 INCH POLY ALONG FM 2208 IN LONGVIEW AND ABANDON 3,128 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY 1241 080.77387 (1,180) RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 2 INCH POLY EAST OF AVE K AND NORTH OF SPRING CREEK PARKWAY IN PLANO, COLLIN COUNTY.ALL CUSTOMERS PLANO RELOCATION OF FACILITIES 1242 080.77389 (783) INSTALL 80 FEET OF 4 INCH, 90 FEET OF 2 INCH POLY ALONG INTERSECTION OF RIDGE ROAD AND HIDDEN VALLEY IN ROCKWALL AND ABANDON 70 FEET OF 4 INCH AND 80 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY 1243 080.77394 (5,209) RELOCATE FACILITIES. INSTALL 2,530 FEET OF 4 INCH AND 500 FEET OF 2 INCH POLY ALONG AUTUMN DRIVE AND ABANDON 2,430 FEET OF 4 INCH AND 440 FEET OF 2 INCH STEEL AND 40 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1244 080.77396 (40,196) INSTALL 50 FEET OF 8 INCH STEEL ALONG GREAT SOUTHWEST PARKWAY IN GRAND PRAIRIE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY 1245 080.77401 (26,902) INSTALL 1,625 FEET OF 4 INCH, 3,245 FEET OF 2 INCH POLY ALONG TUMALO TRAIL AND ODESSA STREET IN DALLAS AND ABANDON 895 FEET OF 6 INCH, 2,425 FEET OF 3 INCH STEEL AND 410 FEET OF 3 INCH, 855 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1246 080.77414 (266,929) INSTALL 610 FEET OF 2 INCH, 1,475 FEET OF 6 INCH POLY ALONG JEFFERSON AND PATTERSON AND ABANDON 989 FEET OF 1.25 INCH, 452 FEET OF 2 INCH, 1,473 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY 1247 080.77422 (18,746) INSTALL 2,000 FEET OF 2 INCH POLY ALONG 2ND STREET FROM AVENUE A TO AVENUE E IN ENNIS AND ABANDON 2,000 OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY 1248 080.77424 (819) INSTALL 370 FEET OF 2 INCH POLY ALONG THE STREETS OF SAN ANGELO AND ABANDON 250 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY 1249 080.77427 (120) INSTALL 80 FEET OF 4 INCH POLY ALONG BLUEBONNET HILLS AND AUSTIN DRIVE IN ENNIS AND ABANDON 80 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY 1250 080.77428 (9,077) INSTALL 2,321 FEET OF 2 INCH POLY AND ABANDON 884 FEET OF 2 INCH, 420 FEET OF 1.25 FEET STEEL AND 280 FEET OF 2 INCH AND 20 FEET OF 1.25 FEET POLY ALONG GILMER STREET, ROSS STREET AND 2ND STREET IN KERRVILLE, KERR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY 1251 080.77429 (36,667) INSTALL 785 FEET OF 4 INCH, 3,115 FEET OF 2 INCH POLY ALONG INSERSOLL STREET AND NOMAS STREET AND ABANDON 365 FEET OF 6 INCH, 2,430 FEET OF 3 INCH STEEL AND 5 FEET OF 3 INCH, 785 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1252 080.77430 (26,649) INSTALL 800 FEET OF 6 INCH POLY ALONG SPRING CREEK PARKWAY IN PLANO AND ABANDON 800 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS PLANO SYSTEM INTEGRITY 1253 080.77432 (35,318) INSTALL 1,400 FEET OF 4 INCH AND 1,940 FEET OF 2 INCH POLY AND ABANDON 1,985 FEET OF 6 INCH, 1.045 FEET OF 3 INCH, AND 10 FEET OF 2 INCH STEEL AND 290 FEET OF 3 INCH, 10 FEET OF 2 INCH POLY ALONG CLYMER STREET AND NOMAS STREET IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1254 080.77434 (11,346) INSTALL 3,205 FEET OF 2 INCH POLY AND ABANDON 1.034 FEET OF 3 INCH, 572 FEET OF 2 INCH STEEL AND 17 FEET OF 4 INCH, 18 FEET OF 3 INCH, 393 FEET OF 2 INCH AND 225 FEET OF 1.25 INCH POLY ALONG NORTH STREET, GILMER STREET, ROSS STREET AND 1ST STREET IN KERR, KERRVILLE COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY 1255 080.77435 (32,605) INSTALL 2,020 FEET OF 6 INCH, 220 FEET OF 4 INCH, AND 290 FEET OF 2 INCH POLY AND ABANDON 1,520 FEET OF 6 INCH, 745 FEET OF 4 INCH, 275 FEET OF 2 INCH STEEL AND 60 FEET OF 6 INCH, 35 FEET OF 3 INCH, AND 60 FEET OF 2 INCH POLY ALONG SINGLEON BOULEVARD AND BERNAL DRIVE IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1256 080.77441 (387) RELOCATE FACILITIES. INSTALL 130 FEET OF 4 INCH POLY ALONG SOUTH 5TH STREET AT THE INTERSECTION OF AZALEA DRIVE IN TEMPLE AND ABANDON 130 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY 1257 080.77445 (5,254) INSTALL 1,900 FEET OF 4 INCH POLY ALONG LAKE HAVASU TRAIL IN FORT WORTH AND ABANDON 1,375 FEET OF 4 INCH POLY AND 525 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1258 080.77448 (25,241) INSTALL 1,100 FEET OF 2 INCH, 900 FEET OF 4 INCH POLY ALONG OAKLAND BOULEVARD AND BRIDGE STREET AND ABANDON 900 FEET OF 4 INCH, 900 FEET OF 2 INCH STEEL AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1259 080.77452 (239) INSTALL 85 FEET OF 2 INCH POLY ON AUSTIN AT 15TH STREET IN WICHITA FALLS AND ABANDON 75 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1260 080.77456 (1,156) INSTALL 322 FEET OF 2 INCH STEEL ALONG WEST 14TH STREET AND ABANDON 322 FEET OF 2 INCH STEELIN BRYAN, BRAZOS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY 1261 080.77459 (3,557) INSTALL 1,560 FEET OF 2 INCH POLY ALONG ANTHONY AND BURNETT IN ENNIS AND ABANDON 920 FEET OF 2 INCH STEEL, 200 FEET OF 1.25 INCH, 170 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ENNIS SYSTEM INTEGRITY 1262 080.77461 (2,903) INSTALL 270 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION DRS28 AND ABANDON 60 FEET OF 2 INCH AND 5 FEET OF 3 INCH AND 160 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION DRS28 ALONG THE STREETS OF ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 1263 080.77463 (179) INSTALL 241 FEET OF 2 INCH POLY ALONG BOB WAY AND CREECHVILLE ROAD IN ENNIS AND ABANDON 241 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY MTX Retirements Page 37 of 45 537 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 1264 080.77474 (168) INSTALL 275 FEET OF 2 INCH POLY ALONG CROCKETT IN CARROLLTON AND ABANDON 275 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY 1265 080.77505 (6,389) INTALL 24 .75 INCH POLY SERVICE LINES ALONG BRENTWOOD LANE IN FARMERS BRANCH AND ABANDON 25 .75 INCH SERVICE LINES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY 1266 080.77506 (105,792) RELOCATE FACILITIES. INSTALL 3,300 FEET OF 4 INCH POLY ALONG STREETS OF WHITE SETTLEMENT, TARRANT COUNTY AND ABANDON 720 FEET OF 2 INCH POLY, 400 FEET OF 2 INCH AND 1,860 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT SYSTEM INTEGRITY 1267 080.77517 (31,167) RELOCATE FACILITIES. INSTALL 787 FEET OF 2 INCH POLY ALONG FERNHEATH LANE AND LAWSON ROAD IN DALLAS AND ABANDON 741 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS WATER, DRAINAGE AND PAVEMENT IMPROVEMENTS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY 1268 080.77519 (21,781) INSTALL 1,500 FEET OF 2 INCH POLY ALONG LA SOBRINA IN DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1269 080.77520 (23,340) INSTALL 500 FEET OF 4 INCH AND 3,500 FEET OF 2 INCH POLY ALONG BERGEN PLACE AND HEARTLESS PLACE IN FARMERS BRANCH, DALLAS COUNTY AND ABANDON 500 FEET OF 4 INCH, AND 3,500 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY 1270 080.77521 (659,806) INSTALL DISTRICT REGULATOR STATION #03 AND 975 FEET OF 4 INCH, 40 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION #03 AND 430 FEET OF 3 INCH STEEL AND 1,200 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CEDAR HILL SYSTEM INTEGRITY 1271 080.77532 (143,056) INSTALL 1,300 FEET OF 4 INCH, 600 FEET OF 2 INCH POLY ALONG ST LAWRENCE IN FORT WORTH AND ABANDON 1,150 FEET OF 4 INCH, 600 FEET OF 2 INCH STEEL AND 150 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1272 080.77533 (62,697) INSTALL 1,300 FEET OF 4 INCH AND 120 FEET OF 2 INCH POLY AND ABANDON 1,300 FEET OF 4 INCH STEEL ALONG ST. LAWRENCE ROAD IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1273 080.77545 (8,723) INSTALL 1,120 FEET OF 4 INCH POLY ALONG CAMELOT ROAD AT ALTAMESA BOULEVARD IN FORT WORTH AND ABANDON 730 FEET OF 2 INCH AND 70 FEET OF 4 INCH POLY. ALL CUSTOMERS FORT WORTH SYSTEM IMPROVEMENT 1274 080.77547 (41) ABANDON VACANT LEAKING SERVICE RISE ALONG FM2318 AND LINE KPD1 IN EASTLAND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DE LEON SYSTEM INTEGRITY 1275 080.77548 (146,294) INSTALL DISTRICT REGULATOR STATION #04 ALONG BELTLINE ROAD AND MERRIFIELD DRIVE IN CEDAR HILL AND ABANDON DISTRICT REGULATOR STATION#04 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL SYSTEM INTEGRITY 1276 080.77552 (17,084) INSTALL 1,405 FEET OF 2 INCH ALONG WESTMINISTER STREET IN KERRVILLE AND ABANDON 642 FEET OF 2 INCH POLY AND 692 FEET OF STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY 1277 080.77570 (49,370) INSTALL 150 SERVICE LINES ALONG THE STREETS OF DUNCANVILLE (MAPSHEET #039) IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY 1278 080.77577 (188) RELOCATE FACILITIES. INSTALL 60 FEET OF 2 INCH POLY ALONG MISSION RIDGE ROAD IN PLANO AND ABANDON 60 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY 1279 080.77578 (8) PROCEEDS OF GREENVILLE TEXAS BUILDING. ALL CUSTOMERS SYSTEM WIDE STRUCTURES 1280 080.77594 (428) INSTALL 3 INCH PLUG VALVE, 8 INCH STOPPLE, 3 INCH STOPPLE AND 2 INCH T.O.R. AND ABANDON NON-OPERABLE 3 INCH PLUG AT RESTLAND STATION ON LINE D IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1281 080.77595 (707) INSTALL 1,730 FEET OF 4 INCH, 50 FEET OF 2 INCH POLY ALONG RICHLAND DRIVE IN WACO, MCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY 1282 080.77596 (184,934) INSTALL 1,700 FEET OF 4 INCH, 360 FEET OF 2 INCH POLY AND ABANDON 1,500 FEET OF 4 INCH AND 60 FEET OF 2 INCH STEEL AND 200 FEET OF 2 INCH AND 300 FEET OF 4 INCH POLY ALONG CANDLEWOOD ROAD IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1283 080.77598 (258,585) INSTALL 400 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #01 ALONG 5TH STREET IN FORRESTON AND ABANDON 250 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORRESTON SYSTEM INTEGRITY 1284 080.77615 (3,062) INSTALL 76 FEET OF 8 INCH AND 110 FEET OF 3 INCH POLY AND ABANDON 76 FEET OF 16 INCH STEEL ALONG RECORD CROSSING AND SLEEPY HOLLOW IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1285 080.77616 (39,930) INSTALL DISTRICT REGULATOR STATION #01 AND 1,700 FEET OF 4 INCH POLY ALONG NORTH INTERURBAN STREET AND WEST HICKMAN STREET IN HUTCHINS AND ABANDON 2,500 FEET OF 2 INCH AND 3 INCH STEEL, 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HUTCHINS SYSTEM INTEGRITY 1286 080.77634 (16,591) INSTALL 2 GROVE PILOTS AND 2 MOONEY PILOTS ALONG FM 1082 AND LINE WA JUNCTION FOR ABILENE PRISON AND ABANDON 2 GROVE PILOTS AND 2 MOONEY PILOTS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 1287 080.77637 (797) INSTALL 25 FEET OF 4 INCH POLY ALONG PRESTON STREET IN DALLAS AND ABANDON 17 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY 1288 080.77648 (5,745) INSTALL DISTRICT REGULATOR STATION #14 ALONG AVENUE G AND 18TH STREET IN CISCO AND ABANDON DISTRICT REGULATOR STATION #14 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY 1289 080.77670 (550,942) INSTALL 1,200 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #01 ALONG LITTLE STREET AND 1ST STREET IN WILMER AND ABANDON 1,500 FEET OF 3 INCH POLY AND 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WILMER SYSTEM INTEGRITY 1290 080.77673 (6,960) RELOCATE FACILITIES. INSTALL 913 FEET OF 6 INCH AND 224 FEET OF 2 INCH POLY ALONG WESTMORELAND ROAD AND EAGLE DRIVE AND ABANDON 893 FEET OF 6 INCH AND 174 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DESOTO SYSTEM INTEGRITY 1291 080.77674 (19,089) INSTALL 1,050 FEET OF 4 INCH, 200 FEET OF 2 INCH POLY ALONG CARVER DRIVE FROM HOPKINS STREET TO FORD STREET ALLEY IN GARLAND AND ABANDON 1,300 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1292 080.77675 (7,002) INSTALL 970 FEET OF 4 INCH POLY ALONG EAST AVENUE EAST FROM HOPKINS STREET TO SOUTH 1ST STREET IN GARLAND AND ABANDON 840 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1293 080.77693 (23,216) INSTALL 24 INCH ACTUATED VALVE ALONG THE STREETS OF GARLAND AND ABANDON 24 INCH VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY 1294 080.77708 (23,314) INSTALL 1,070 FEET OF 4 INCH POLY AND ABANDON 1,700 FEET OF 6 INCH STEEL ALONG I- 45 HWY AND EAST ILLINOIS AVENUE IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1295 080.77710 (161,024) INSTALL 1,660 FEET OF 4 INCH, 300 FEET OF 2 INCH POLY AND ABANDON 1,550 FEET OF 4 INCH, 240 FEET OF 2 INCH STEEL, 115 FEET OF 4 INCH, 60 FEET OF 2 INCH POLY ALONG GREEN RIVER TRAIL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1296 080.77714 (5,366) INSTALL 155 FEET OF 2 INCH AND 40 FEET OF 6 INCH POLY IN THE ALLEY WEST OF RODGERS FROM MADISON NORTH IN WAXAHACHIE AND ABANDON 989 FEET OF 1.25 FEET OF, 452 FEET OF 2 INCH AND 1,473 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY 1297 080.77715 (47,719) INSTALL 670 FEET OF 2 INCH, 1,120 FEET OF 4 INCH, 280 FEET OF 6 INCH POLY AND ABANDON 1,037 FEET OF 2 INCH, 546 FEET OF 4 INCH, 262 FEET OF 6 INCH STEEL AND 1.097 FEET OF 2 INCH POLY ALONG INTERSECTION OF BETHEL AND OLDHAM IN WAXAHACHIE, ELLIS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY 1298 080.77716 (143,709) INSTALL 520 FEET OF 2 INCH, 10 FEET OF 4 INCH, 850 FEET OF 6 INCH POLY AND ABANDON 80 FEET OF 2 INCH, 30 FEET OF 4 INCH, 800 FEET OF 6 INCH STEEL ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY MTX Retirements Page 38 of 45 538 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 1299 080.77717 (13,063) INSTALL 420 FEET OF 2 INCH, 800 FEET OF 4 INCH POLY AND ABANDON 85 FEET OF 2 INCH, 25 FEET OF 4 INCH POLY AND 205 FEET OF 2 INCH, 1,700 FEET OF 4 INCH STEEL ALONG OLDHAM AND FLAT IN WAXAHACHIE, ELLIS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY 1300 080.77721 (18,560) INSTALL 3,100 FEET OF 2 INCH POLY AND ABANDON 100 FEET OF 1.25 INCH, 3,000 FEET OF 2 INCH STEEL ALONG OWENS AND LAMPASSAS IN ENNIS, ELLIS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY 1301 080.77724 (999) INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 2 INCH STEEL ALONG THE RIGHT OF WAY OF ROSA AND ROWE IN ENNIS, ELLIS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY 1302 080.77730 (6,084) INSTALL 880 FEET OF 6 INCH, 700 FEET OF 2 INCH POLY AND ABANDON 880 FEET OF 6 INCH, 625 FEET OF 2 INCH STEEL ALONG MILAM AND CHATFIELD IN ENNIS, ELLIS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ENNIS SYSTEM INTEGRITY 1303 080.77736 (3,171) RELOCATE FACILITIES. INSTALL 125 FEET OF 8 INCH POLY ALONG FISHER ROAD IN WICHITA FALLS AND ABANDON POLY MAIN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1304 080.77743 (4,206) INSTALL 550 FEET OF 2 INCH POLY AND ABANDON 310 FEET OF 1.25 INCH, 160 FEET OF 2 INCH POLY AND 150 FEET OF 2 INCH STEEL ALONG DALLAS AND MADISON IN ENNIS, ELLIS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY 1305 080.77746 (1,850) INSTALL 850 FEET OF 2 INCH POLY ALONG EDGEWOOD AND METROPOLITAN IN ENNIS AND ABANDON 500 FEET OF 2 INCH STEEL AND 350 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY 1306 080.77749 (18,522) RELOCATE FACILITIES. INSTALL 760 FEET OF 6 INCH POLY ALONG STATE HIGHWAY 6 IN COLLEGE STATION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES 1307 080.77750 (133,872) INSTALL 1,570 FEET OF 4 INCH POLY AND ABANDON 1,465 FEET OF 4 INCH STEEL, 105 FEET OF 4 INCH POLY ALONG SOUTH RIDGE TERRACE IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1308 080.77751 (9,171) INSTALL 2,540 FEET OF 4 INCH POLY AND ABANDON 1,678 FEET OF 3 INCH STEEL AND 738 FEET OF 3 INCH POLY ALONG EAST SAUNDERS (FM 814) AND US HWY 69 IN TRENTON, FANNIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS TRENTON SYSTEM INTEGRITY 1309 080.77755 (222,309) INSTALL 850 FEET OF 2 INCH, 530 FEET OF 4 INCH, 1,625 FEET OF 8 INCH POLY AND ABANDON 640 FEET OF 2 INCH, 380 FEET OF 3 INCH, 475 FEET OF 4 INCH, AND 1,595 FEET OF 8 INCH STEEL ALONG WEBB CHAPEL ROAD IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1310 080.77756 (38,649) INSTALL DISTRICT REGULATOR STATION #21 ALONG EAST WILLINGHAM STREET AND COLORADO STREET IN CLEBURNE AND ABANDON DISTRICT REGULATOR STATION #21 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY 1311 080.77760 (412) INSTALL 275 FEET OF 2 INCH POLY ALONG MURRAY STREET IN DALLAS AND ABANDON 275 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1312 080.77764 (6,245) INSTALL 55 FEET OF 2 INCH POLY ALONG ROSSER SQUARE IN DALLAS AND ABANDON 980 FEET OF POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1313 080.77771 (4,524) INSTALL 1,550 FEET OF 4 INCH POLY ALONG FULLER AVENUE AND SOUTH RIDGE TERRACE IN FORT WORTH AND ABANDON 1,370 FEET OF 4 INCH STEEL AND 180 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1314 080.77772 (2,557) REPLACED REMOTE TERMINAL UNIT (RTU) IN LEWISVILLE THAT WAS HIT AND BURNED TO THE GROUND BY A CAR.ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY 1315 080.77786 (126) INSTALL 150 FEET OF 2 INCH POLY AND ABANDON 150 FEET OF 2 INCH STEEL ALONG FM 1033 NORTH OF US 287 IN TXDOT ROAD RIGHT OF WAY IN KIRKLAND, CHILDRESS COUNTY.ALL CUSTOMERS KIRKLAND RELOCATION OF FACILITIES 1316 080.77790 (6,746) INSTALL 300 FEET OF 6 INCH POLY ALONG ESTERS ROAD IN DALLAS AND ABANDON 160 FEET OF 4 INCH STEEL AND 100 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY 1317 080.77791 (29,229) INSTALL 2,400 FEET OF 2 INCH POLY ALONG MELITA AVENUE AND OVERTON ROAD IN FORT WORTH AND ABANDDON 1,280 FEET OF 3 INCH AND 1,120 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1318 080.77802 (462) INSTALL 100 FEET OF 4 INCH POLY ALONG HIGH COUNTRY DRIVE IN CARROLLTON AND ABANDON 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY 1319 080.77810 (26,783) INSTALL 2,825 FEET OF 2 INCH POLY AND ABANDON 2,800 FEET OF 3 INCH STEEL ALONG THE ALLEY BETWEEN SAN MARCUS AND SAN PAULA IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1320 080.77812 (18,102) INSTALL 1,732 FEET OF 2 INCH POLY ALONG BRANCH DRIVE IN GARLAND AND ABANDON 1,706 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1321 080.77819 (1,613) RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH POLY ALONG LYNWORTH DRIVE ALLEY IN DALLAS AND ABANDON 600 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1322 080.77823 (7,114) INSTALL 1,875 FEET OF 2 INCH POLY AND ABANDON 361 FEET OF 1 INCH, 499 FEET OF 2 INCH, 774 FEET OF 4 INCH STEEL AND 15 FEET OF 4 INCH, 767 FEET OF 2 INCH POLY ALONG 3RD AND AVENUE G IN CHILLICOTHE, HARDEMAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILLICOTHE SYSTEM INTEGRITY 1323 080.77825 (1,499) RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY ALONG TOPHILL LANE AND ABANDON 700 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1324 080.77826 (87,937) INSTALL 680 FEET OF 2 INCH, 620 FEET OF 4 INCH POLY ALONG MELITA AND SOUTH RIDGE TERRACE IN FORT WORTH AND ABANDON 580 FEET OF 2 INCH AND 620 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1325 080.77833 (1,021) ABANDON 550 FEET OF 2 INCH POLY ALONG LEMONTREE LANE ALLEY IN PLANO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY 1326 080.77840 (8,824) INSTALL 1,200 FEET OF 6 INCH POLY AT NORTH BRYANT HIGHWAY 87 AND 6TH STREET IN SAN ANGELO AND ABANDON 1,200 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY 1327 080.77854 (1,611) INSTALL 570 FEET OF 2 INCH POLY ALONG METROPOLITAN AND CHATFIELD IN ENNIS AND ABANDON 470 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY 1328 080.77860 (3,128) INSTALL 1,500 FEET OF 6 INCH POLY ALONG W. NEAL AND HUNT STREETS, 75 FEET OF 4 INCH POLY ALONG HUNT STREET AND 375 FEET OF 2 INCH ALONG BOIS D ARC STREET AND ABANDON 350 FEET OF 6 INCH, 965 FEET OF 4 INCH, 625 FEET OF 3 INCH STEEL IN COMMERCE, HUNT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY 1329 080.77865 (4,122) INSTALL 40 FEET OF 6 INCH, 1,160 FEET OF 4 INCH AND 40 FEET OF 2 INCH POLY ALONG FOR MCKAVITT ROAD IN SAN ANGELO AND ABANDON 30 FEET OF 6 INCH AND 1,050 FEET OF 3 INCH STEEL AND 10 FEET OF 6 INCH AND 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY 1330 080.77867 (44,967) INSTALL LOW PRESSURE STATION AT BRYAN DISTRICT REGULATOR STATION DRS03 ALONG HASWELL DRIVIE AND ABANDON BRYAN DISTRICT REGULATOR STATION DRS03 IN BRYAN, BRAZOS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY 1331 080.77894 (528) INSTALL LOW PRESSURE STATION AT HEARNE DISTRICT REGULATOR STATION DRS03 AND ABANDON HEARNE DISTRICT REGULATOR STATION DRS03 ALONG THE STREETS OF HEARNE, ROBERTSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HEARNE SYSTEM INTEGRITY 1332 080.77898 (377) INSTALL 452 FEET OF 2 INCH POLY ALONG HOLLOMAN STREET IN BRYAN AND ABANDON 452 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS NORMANGEE SYSTEM INTEGRITY 1333 080.77899 (1,435) INSTALL 670 FEET OF 4 INCH, 285 FEET OF 2 INCH POLY ALONG BILGLADE AND WESTCREEK IN FORT WORTH AND ABANDON 500 FEET OF 4 INCH, 160 FEET OF 2 INCH STEEL AND 170 FEET OF 4 INCH AND 125 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY MTX Retirements Page 39 of 45 539 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 1334 080.77905 (79) RELOCATE FACILITIES. INSTALL 7 SERVICES ALONG CHURCHILL ROAD TO ACCOMMODATE CITY OF FORT WORTH PAVEMENT PROJECT AND ABANDON 7 SERVICES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1335 080.77909 (64) PERFORM CAPITAL INTEGRITY DIGS ALONG LINE CA (2ND) EAST NEAR FORT WORTH AND INSTALL CLOCKSPRINGS ON DIGS 2017-15 AND 2017-25 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1336 080.77912 (6,061) INSTALL 550 FEET OF 2 INCH POLY ALONG WALKER AND CREECHVILLE ROAD IN ENNIS, ELLIS COUNTY AND ABANDON 378 FEET OF 2 INCH STEEL, 272 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY 1337 080.77914 (99) INSTALL 460 FEET OF 2 INCH POLY ALONG WARREN LANE AND ABANDON 460 FEET OF 3 INCH STEEL IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1338 080.77916 (2,535) INSTALL 372 FEET OF 2 INCH POLY AND 120 FEET OF 4 INCH STEEL ALONG SHAWNEE AND CREECHVILLE ROAD IN ENNIS, ELLIS COUNTY AND ABANDON 372 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ENNIS SYSTEM INTEGRITY 1339 080.77920 (4,586) INSTALL 800 FEET OF 2 INCH, 420 FEET OF 4 INCH POLY ALONG CRETON COURT AND CORDONE COURT AND ABANDON 800 FEET OF 2 INCH, 420 FEET OF 4 INCH STEEL IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1340 080.77921 (20,502) INSTALL DISTRICT REGULATOR STATION #01, 40 FEET OF 2 INCH POLY ALONG NORTH BEAL STREET AND EAST 5TH AVENUE IN BELTON AND ABANDON DISTRICT REGULATOR STATION #01 AND 40 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY 1341 080.77922 (7,395) INSTALL REGULATOR SPOOL WITH RELIEF VALVE ALONG SOUTH MAIN STREET AND EAST AVENUE A IN BELTON AND ABANDON WORKER MONITOR REGULATOR SPOOL AT DISTRICT REGULATOR STATION #23 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BELTON SYSTEM INTEGRITY 1342 080.77923 (1,393) INSTALL DISTRICT REGULATOR STATION #09, 80 FEET OF 4 INCH AND 2 INCH STEEL ALONG SOUTH KRANES AVENUE AND WEST MAIN STREET IN CAMERON AND ABANDON DISTRICT REGULATOR STATION #09, 100 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY 1343 080.77924 (6,822) INSTALL DISTRICT REGULATOR STATION #01, 50 FEET OF 3 INCH, 50 FEET OF 2 INCH AND 50 FEET OF 4 INCH POLY ALONG EAST NORTH ALLEY STREET AND NORTH 1ST STREET IN LOTT AND ABANDON DISTRICT REGULATOR STATION #01, 100 FEET OF 3 INCH, 50 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS LOTT SYSTEM INTEGRITY 1344 080.77925 (16,208) INSTALL DISTRICT REGULATOR STATION #02, 50 FEET OF 3 INCH, 50 FEET OF 2 INCH, AND 50 FEET OF 4 INCH POLY ALONG 5TH STREET AND EAST GASSAWAY STREET IN LOTT AND ABANDON DISTRICT REGULATOR STATION #02, 100 FEET OF 3 INCH AND 50 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LOTT SYSTEM INTEGRITY 1345 080.77926 (11,900) INSTALL DISTRICT REGULATOR STATION #04 AND 200 FEET OF 6 INCH POLY ALONG WEST H AVENUE AND SOUTH 25TH STREET IN TEMPLE AND ABANDON DISTRICT REGULATOR STATION #04 AND 200 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY 1346 080.77927 (26,677) INSTALL DISTRICT REGULATOR STATION #05 AND 200 FEET OF 6 INCH POLY ALONG EAST GARFIELD AVENUE AND NORTH 8TH STREET IN TEMPLE AND ABANDON DISTRICT REGULATOR STATION #05 AND 200 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY 1347 080.77928 (3,498) INSTALL DISTRICT REGULATOR STATION #07 ALONG WEST AVENUE L AND SOUTH 21ST STREET IN TEMPLE AND ABANDON DISTRICT REGULATOR STATION #07 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY 1348 080.77929 (3,998) INSTALL NEW REGULATOR SPOOL AND RELIEF VALVE AND ABANDON ONE REGULATOR IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY 1349 080.77930 (4,544) INSTALL DISTRICT REGULATOR STATION #02, 40 FEET OF 2 INCH AND 40 FEET OF 4 INCH POLY ALONG NORTH BURNS AVENUE AND EAST 7TH STREET IN CAMERON AND ABANDON DISTRICT REGULATOR STATION #02 AND 80 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY 1350 080.77932 1,558 INSTALL REGULATOR SPOOL AND RELIEF VALVE FOR DISTRCT REGULATOR STATION #20 ALONG WEST AVENUE T AND SOUTH 5TH STREET IN TEMPLE AND ABANDON WORKER MONITOR REGULATOR SPOOL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY 1351 080.77933 (5,908) INSTALL DISTRICT REGULATOR STATION #21, 40 FEET OF 2 INCH AND 40 FEET OF 4 INCH POLY ALONG WEST 9TH AVENUE AND KING STREET IN TEMPLE AND ABANDON DISTRICT REGULATOR STATION, 80 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY 1352 080.77934 (1,375) INSTALL DISTRICT REGULATOR STATION DRS01, 40 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS01, 80 FEET OF 4 INCH STEEL ALONG THE STREETS OF TROY, BELL COUNTY AND ABANDON DISTRICT REGULATOR STATION DRS01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS TROY SYSTEM INTEGRITY 1353 080.77941 (150) INSTALL 220 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 4 INCH STEEL ALONG ANDERSON DRIVE IN HURST IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY 1354 080.77960 (4,119) INSTALL 1,600 FEET OF 4 INCH POLY AND ABANDON 1,600 FEET OF 4 INCH STEEL ALONG WESTCREEK DRIVE AND CROMART COURT IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1355 080.77961 (547) RELOCATE FACILITIES. INSTALL 35 FEET OF 4 INCH POLY ALONG THE STREETS OF BRIDGEPORT.ALL CUSTOMERS BRIDGEPORT RELOCATION OF FACILITIES 1356 080.77970 (7,923) INSTALL 600 FEET OF 6 INCH POLY ALONG MCKINNEY STREET IN DENTON AND ABANDON 115 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY 1357 080.77971 (1,078) INSTALL 510 FEET OF 4 INCH, 315 FEET OF 2 INCH POLY AND ABANDON 38 FEET OF 4 INCH, 315 FEET OF 2 INCH STEEL ALONG WESTCREEK DRIVE IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1358 080.77972 (3,907) RELOCATE FACILITIES. INSTALL 680 FEET OF 4 INCH POLY ALONG SOUTH OAKES STREET IN SAN ANGELO AND ABANDON 535 FEET OF 4 INCH POLY AND 100 FEET OF 4 INCH STEEL.ALL CUSTOMERS SAN ANGELO RELOCATION OF FACILITIES 1359 080.77985 (18,669) INSTALL 1,600 FEET OF 2 INCH POLY AND ABANDON 1,600 FEET OF 3 INCH STEEL ALONG VEGA COURT IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1360 080.78001 (1,766) RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG CINNABAR AND SYMPHONY IN DALLAS AND ABANDON 100 FEET OF 4 INCH POLY. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES 1361 080.78014 (57,284) INSTALL 1,310 FEET OF 2 INCH, 120 FEET OF 4 INCH POLY AND ABANDON 1,120 FEET OF 2 INCH AND 120 FEET OF 4 INCH POLY AND 190 FEET OF 2 INCH STEEL ALONG WILLOW RIDGE ROAD AND LAKE CHARLES AVENUE IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1362 080.78030 (1,443) INSTALL 600 FEET OF 4 INCH POLY ALONG THE STREETS OF HILLSBORO AND ABANDON 600 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY 1363 080.78049 (294) INSTALL 1,100 FEET OF 4 INCH POLY AND ABANDON 1,100 FEET OF 4 INCH STEEL ALONG GREEN RIVER TRAIL IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1364 080.78064 (12,189) INSTALL 100 FEET OF 2 INCH POLY ALONG KILLION AND WALNUT HILL IN DALLAS AND ABANDON 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY 1365 080.78075 (113,682) RELOCATE FACILITIES. INSTALL 1,160 FEET OF 6 INCH, 680 FEET OF 4 INCH POLY ALONG ROBERTS CUTOFF IN RIVER OAKS, TARRANT COUNTY AND ABANDON 470 FEET OF 2 INCH, 1,110 FEET OF 6 INCH STEEL AND 250 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY MTX Retirements Page 40 of 45 540 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 1366 080.78081 (946) INSTALL 250 FEET OF 2 INCH POLY ALONG HUNT STREET IN GORDON AND ABANDON 100 FEET OF 2 INCH AND 150 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORDON SYSTEM INTEGRITY 1367 080.78092 (7,837) INSTALL RELIEF VALVES AT ATHENS DISTRICT REGULATOR STATION #02 ALONG SOUTH MURCHISON STREET AND EAST CORSICANA STREET AND DISTRICT REGULATOR STATION #03 ALONG MACK STREET IN ATHENS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ATHENS SYSTEM INTEGRITY 1368 080.78093 (459) RELOCATE FACILITIES. INSTALL 150 FEET OF 12 INCH STEEL ALONG FINFEATHER DT LINE AT ESTHER BOULEVARD IN BRYAN AND ABANDON 150 FEET OF 12 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY 1369 080.78097 (2,135) ABANDON MAIN LINE REGULATOR #11 ALONG WILLIAMS AND OLYMPIC IN ROCKWALL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY 1370 080.78104 (1,253) RELOCATE FACILITIES. INSTALL 755 FEET OF 4 INCH POLY ALONG NORTH COLLEGE AVENUE AND ABANDON 300 FEET OF 4 INCH STEEL AND 300 FEET OF 2 INCH POLY IN SNYDER, SCURRY COUNTY.ALL CUSTOMERS SNYDER RELOCATION OF FACILITIES 1371 080.78105 (63,286) INSTALL DISTRICT REGULATOR STATION #401 ALONG MT. VERNON AVENUE AND MOUNT VIEW AVENUE IN FORT WORTH AND ABANDON DISTRICT REGULATOR STATION #401 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1372 080.78107 (2,060) REMOVE THE UST AT JOSHUA YARD IN JOSHUA. ALL CUSTOMERS SYSTEM WIDE STRUCTURES 1373 080.78109 (82,222) INSTALL 1,015 FEET OF 4 INCH, 215 FEET OF 2 INCH POLY AND ABANDON 1,015 FEET OF 4 INCH, 215 FEET OF 2 INCH STEEL ALONG GREEN RIVER TRAIL IN FORT WORTH, TARRANT COUNTY, IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1374 080.78113 (395) ABANDON 482 FEET OF 1.25 INCH STEEL ALONG STATE HIGHWAY 64 EAST IN CHAPEL HILL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TYLER SYSTEM INTEGRITY 1375 080.78125 (39,547) INSTALL 45 FEET OF 8 INCH POLY ALONG WALNUT AND CENTRAL IN DALLAS AND ABANDON 45 FEET OF 8 INCH STEEL AND INOPERABLE 8 INCH EMR VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1376 080.78133 (31,076) INSTALL 1,710 FEET OF 4 INCH, 1,120 FEET OF 2 INCH POLY AND ABANDON 2,830 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG GOLDWOOD AND HAVENWOOD IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1377 080.78145 (381) INSTALL 275 FEET OF 2 INCH POLY ALONG F STREET IN KERRVILLE AND ABANDON 275 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY 1378 080.78149 (880) RELOCATRE FACILITIES. INSTALL 191 FEET OF 6 INCH AND 227 FEET OF 4 INCH POLY ALONG HILLSIDE AND JILL ANN IN FORT WORTH AND ABANDON 185 FEET OF 6 INCH AND 200 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF BURLESON STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY 1379 080.78169 (2,381) INSTALL 525 FEET OF 2 INCH POLY ALONG CROCKETT AND CARLTON IN ENNIS AND ABANDON 444 FEET OF 2 INCH STEEL AND 65 FEET OF 2 INCH AND 13 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY 1380 080.78172 (16,025) INSTALL 315 FEET OF 4 INCH AND 2,155 FEET OF 2 INCH POLY AND ABANDON 315 FEET OF 4 INCH, 2,155 FEET OF 3 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG THE ALLEY OF IVYWOOD AND HAVENWOOD IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1381 080.78173 (1,831) INSTALL 250 FEET OF 2 INCH POLY ALONG WACO AND CARLTON IN ENNIS AND ABANDON 650 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ENNIS SYSTEM INTEGRITY 1382 080.78184 (17,668) INSTALL DISTRICT REGULATOR STATION #13 AND 1,200 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY ALONG PINE STREET IN RANGER AND ABANDON 158 FEET OF 1.25 INCH, 46 FEET OF 2 INCH, 252 FEET OF 4 INCH POLY AND 589 FEET OF 4 INCH, 68 FEET OF 1.25 INCH, 259 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION #13 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER SYSTEM INTEGRITY 1383 080.78189 (18,720) INSTALL 735 FEET OF 8 INCH, 1,305 FEET OF 2 INCH POLY AND ABANDON 725 FEET OF 8 INCH, 1305 FEET OF 3 INCH STEEL AND 10 FEET OF 8 INCH POLY ALONG CREST RIDGE DR AND CASA VIEW ALLEY IN DALLAS, DALLAS COUNTY, IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1384 080.78193 (10,053) INSTALL 330 FEET OF 4 INCH AND 2,140 FEET OF 2 INCH POLY AND ABANDON 330 FEET OF 4 INCH, 2,140 FEET OF 3 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG THE ALLEY BETWEEN IVYWOOD AND JADEWOOD NEAR RACINE IN DALLAS, DALLAS COUNTY, IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1385 080.78194 (21,630) INSTALL 2,035 FEET OF 4 INCH AND 1,315 FEET OF 2 INCH POLY AND ABANDON 960 FEET OF 4 INCH, 2,390 FEET OF 3 INCH STEEL ALONG THE ALLEY BETWEEN KIRNWOOD AND JADEWOOD NEAR RACINE IN DALLAS, DALLAS COUNTY, IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1386 080.78226 (1,543) RELOCATE FACILITIES. INSTALL 7 .75 INCH SERVICE LINES ALONG CROSS BEND ROAD AND KNOB HILL IN PLANO AND ABANON 7 .75 INCH SERVICE LINES TO ACCOMMODATE THE CITY OF PLANO'S INSTALLATION OF A SCREENING WALL. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES 1387 080.78229 (487) INSTALL 400 FEET OF 2 INCH POLY ALONG NORTH CENTRAL AVENUE IN KNOX CITY AND ABANDON 420 FEET 1.25 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS KNOX CITY SYSTEM INTEGRITY 1388 080.78230 (7,464) INSTALL 1,580 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY ALONG STREETS OF SNYDER AND ABANDON 386 FEET OF 3 INCH AND 1,200 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #14 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SNYDER SYSTEM INTEGRITY 1389 080.78233 (1) RELOCATE FACILITIES. INSTALL 13 SERVICE LINES ALONG CRAVENS ROAD IN FORT WORTH AND ABANDON 13 SERVICE LINES TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1390 080.78234 (7,219) ABANDON 2,675 FEET OF 2 INCH POLY ALONG THE STREETS OF GLEN CROSSING IN CELINA.ALL CUSTOMERS CELINA SYSTEM INTEGRITY 1391 080.78247 (232) RELOCATE FACILITIES. INSTALL 25 FEET OF 6 INCH POLY ALONG SOUTH MAIN STREET IN MANSFIELD AND ABANDON 15 FEET OF 6 INCH POLY. ALL CUSTOMERS MANSFIELD RELOCATION OF FACILITIES 1392 080.78265 (3,737) ABANDON BRUCEVILLE-EDDY ML-02 AND 843 FEET OF 2 INCH STEEL AND 1,084 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRUCEVILLE EDDY SYSTEM INTEGRITY 1393 080.78300 (6,571) INSTALL 1,865 FEET OF 6 INCH AND 200 FEET OF 2 INCH POLY ALONG ILLINOIS DRIVE AND MAPLE STREET IN CELINA AND ABANDON 250 FEET OF 3 INCH AND 200 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA SYSTEM INTEGRITY 1394 080.78301 (17,080) INSTALL 1,338 FEET OF 6 INCH AND 515 FEET OF 2 INCH POLY AND ABANDON 1,450 FEET OF 2 INCH POLY ALONG BEECH STREET AND ILLINOIS DRIVE IN CELINA, COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CELINA SYSTEM INTEGRITY 1395 080.78344 (194) INSTALL 285 FEET OF POLY ALONG CLEVELAND STREET IN NORTH ZULCH AND ABANDON 277 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS NORTH ZULCH SYSTEM INTEGRITY 1396 080.78350 (10,531) INSTALL 80 FEET OF 2 INCH, 1,610 FEET OF 6 INCH POLY ALONG EAST GARFIELD STREET AND NORTH 8TH STREET IN TEMPLE AND ABANDON 23 FEET OF 2 INCH, 1,110 FEET OF 4 INCH AND 300 FEET OF STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY 1397 080.78364 (2,207) RELOCATE FACILITIES. INSTALL 570 FEET OF 4 INCH POLY AND ABANDON 570 FEET OF 4 INCH POLY ALONG GREENS PRAIRIE TRAIL IN COLLEGE STATION, BRAZOS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY 1398 080.78367 (11,866) INSTALL 400 FEET OF 6 INCH POLY ALONG HIGHWAY 75 AND ABANDON 400 FEET OF 6 INCH POLY IN MCKINNEY, COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY 1399 080.78374 (1,084) INSTALL 420 FEET OF 2 INCH POLY ALONG MASSIE AND HIGH STREET IN THROCKMORTON AND ABANDON 500 FEET OF 1 INCH, 20 FEET OF 2 INCH STEEL AND 487 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THROCKMORTON SYSTEM INTEGRITY MTX Retirements Page 41 of 45 541 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 1400 080.78378 (94) ABANDON 104 FEET OF 2 INCH STEEL ALONG POLK AT AVENUE L IN WICHITA FALLS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1401 080.78379 (8,366) INSTALL 125 FEET OF 8 INCH POLY ALONG HEIGHTS BOULEVARD AND FM2181 IN DENTON AND ABANDON 100 FEET OF POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY 1402 080.78384 (2,611) INSTALL 7,400 FEET OF 4 INCH AND 50 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION AND ABANDON 13 FEET OF 4 INCH AND 8 FEET OF 2 INCH POLY ALONG THE STREETS OF WICHITA FALLS, WICHITA COUNTY. ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES 1403 080.78386 (23,754) RELOCATE FACILITIES. INSTALL 1,200 FEET OF 4 INCH POLY ALONG FM 548 IN FORNEY AND ABANDON 1,400 FEET OF 4 INCH POLY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FORNEY RELOCATION OF FACILITIES 1404 080.78389 (11,258) INSTALL 1,090 FEET OF 4 INCH, 895 FEET OF 2 INCH POLY AND ABANDON 870 FEET OF 3 INCH, 540 FEET OF 2 INCH STEEL AND 450 FEET OF 2 INCH POLY ALONG LEEWOOD STREET AND LAPSLEY STREET IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1405 080.78399 (2,672) INSTALL 2,100 FEET OF 4 INCH POLY AND ABANDON 345 FEET OF 4 INCH POLY ALONG THE STREETS OF ABILENE, TAYLOR COUNTY. ALL CUSTOMERS ABILENE RELOCATION OF FACILITIES 1406 080.78415 (3,943) RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH POLY ALONG CABELA DRIVE IN FORT WORTH AND ABANDON 50 FEET OF 6 INCH POLY TO ACCOMMODATE ONCOR MANHOLE INSTALLATION.ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES 1407 080.78416 (780) RELOCATE FACILITIES. INSTALL 100 FEET OF 8 INCH POLY ALONG WASHINGTON STREET AND COLUMBUS AVENUE IN WACO, MCLENNAN COUNTY AND ABANDON 100 FEET OF 8 INCH STEEL.ALL CUSTOMERS WACO RELOCATION OF FACILITIES 1408 080.78422 (1,138) ABANDON 430 FEET OF 3 INCH POLY ALONG ELM STREET IN MCKINNEY. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY 1409 080.78429 (1,525) INSTALL 750 FEET OF 4 INCH POLY AND ABANDON 750 FEET OF 3 INCH STEEL ALONG EAST JEFFERSON STREET TO POLK IN WHITNEY, HILL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITNEY SYSTEM INTEGRITY 1410 080.78456 (20,583) INSTALL 2,950 FEET OF 4 INCH, 1,900 FEET OF 2 INCH POLY AND ABANDON 2,950 FEET OF 4 INCH AND 2,160 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF GLENN HEIGHTS DRAINAGE IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GLENN HEIGHTS SYSTEM INTEGRITY 1411 080.78472 (571,446) INSTALL 16 INCH EMR-024B VALVE, 16 INCH EMR VALVE, 24 INCH EMR VALVE AND 10 FEET OF 24 INCH STEEL AND ABANDON 16 INCH EMR-024B VALVE, 16 INCH EMR VALVE, 24 INCH EMR VALVE AND 10 FEET OF 24 INCH STEEL IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1412 080.78490 (21) INSTALL 5 FEET OF 2 INCH POLY ALONG AVENUE L IN WICHITA FALLS AND ABANDON 5 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1413 080.78506 (5,975) INSTALL 3,311 FEET OF 2 INCH, 429 FEET OF 4 INCH POLY AND ABANDON 252 FEET OF 2 INCH, 1,637 FEET OF 3 INCH, AND 254 FEET OF 2 INCH STEEL AND 500 FEET OF 2 INCH POLY ALONG NORTH 14TH STREET AND NORTH 12TH STREET IN TEMPLE, BELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY 1414 080.78508 (1,702) INSTALL 1,250 FEET OF 2 INCH POLY AND ABANDON 950 FEET OF 2 INCH STEEL, 320 FEET OF 2 INCH POLY ALONG LOCUST STREET IN AZLE, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AZLE SYSTEM INTEGRITY 1415 080.78526 (2,850) RELOCATE FACILITIES. INSTALL 700 FEET OF 4 INCH POLY ALONG PARK STREET AND CORSICANA HIGHWAY IN HILLSBORO AND ABANDON 335 FEET OF 3 INCH STEEL. ALL CUSTOMERS HILLSBORO RELOCATION OF FACILITIES 1416 080.78528 (5,189) INSTALL DISTRICT REGULATOR STATION #36 AND #10 AND 45 FEET OF 4 INCH, 360 FEET OF 2 INCH POLY IN COLEMAN AND ABANDON 162 FEET OF 1.25 INCH 15 FEET OF 4 INCH AND 15 FEET OF 2 INCH POLY, 138 FEET OF 1.25 INCH, 30 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION #46 AND #10 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY 1417 080.78530 (19,584) INSTALL 1,000 FEET OF 6 INCH STEEL AND ABANDON 1,000 FEET OF 6 INCH STEEL FROM STATION 835+08 TO 845+08 IN LAWN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS LAWN SYSTEM INTEGRITY 1418 080.78570 (18,165) INSTALL 370 FEET OF 2 INCH AND 850 FEET OF 4 INCH POLY AND ABANDON 370 FEET OF 2 INCH, 850 FEET OF 4 INCH STEEL ALONG EAST OAK DRIVE IN HURST, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY 1419 080.78581 (6,871) INSTALL 560 FEET OF 2 INCH POLY ALONG EAST RENFRO AND EAST ELLISON STREET IN BURLESON AND ABANDON 1,120 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY 1420 080.78586 (107) RELOCATE FACILITIES. INSTALL 135 FEET OF 2 INCH POLY ALONG HIGHWAY 82 AND TEXOMA PARKWAY IN SHERMAN AND ABANDON 2 INCH STEEL RISER AND DOUBLE METER LOOP.ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES 1421 080.78589 (14,479) INSTALL 2,650 FEET OF 2 INCH POLY ALONG MCNEIL AND SCYENE IN DALLAS AND ABANDON 2,650 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1422 080.78595 (14) RELOCATE FACILITIES. INSTALL 275 FEET OF 2 INCH POLY ALONG ENTERPRISE WAY IN GREENVILLE AND ABANDON 17 FEET OF 2 INCH POLY. DEVELOPER INSTALLED FACILITIES.ALL CUSTOMERS GREENVILLE RELOCATION OF FACILITIES 1423 080.78613 (18,914) INSTALL 955 FEET OF 4 INCH AND 1,400 FEET OF 2 INCH POLY AND ABANDON 940 FEET OF 6 INCH, 1,400 FEET OF 3 INCH STEEL AND 55 FEET OF 6 INCH POLY ALONG THE ALLEY OF SHILOH AND MAYHEW IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1424 080.78621 (2,038) INSTALL 250 FEET OF 3 INCH, 250 FEET OF 2 INCH POLY AND ABANDON 250 FEET OF 3 INCH, 250 FEET OF 2 INCH STEEL IN MOODY, MCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MOODY SYSTEM INTEGRITY 1425 080.78622 (18,673) INSTALL 365 FEET OF 4 INCH AND 1,610 FEET OF 2 INCH POLY AND ABANDON 480 FEET OF 6 INCH AND 1,650 FEET OF 3 INCH STEEL ALONG THE ALLEY OF SHILOH AND DUNAWAY IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1426 080.78649 (7,894) INSTALL 1,741 FEET OF 6 INCH, 60 FEET OF 2 INCH POLY AND ABANDON 680 FEET OF 6 INCH, 200 FEET OF 4 INCH, AND 425 FEET OF 2 INCH STEEL ALONG PINE STREET AND ANSON AVENUE IN ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 1427 080.78659 (170,859) RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY ALONG THOMPSON DRIVE AND ABANDON 250 FEET OF 4 INCH STEEL IN RICHARDSON, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY 1428 080.78677 (26,289) RELOCATE FACILITIES. INSTALL 175 FEET OF 4 INCH POLY ALONG ROOSEVELT AVENUE AND ABANDON 165 FETE OF 4 INCH STEEL TO ACCOMODATE CITY ALLEY PAVING PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1429 080.78697 (579) RELOCATE FACILITIES. INSTALL 1,665 FEET OF 2 INCH, 350 FEET OF 4 INCH POLY AND ABANDON 1,660 FEET OF 2 INCH, 200 FEET OF 3 INCH AND 150 FEET OF 4 INCH STEEL ALONG HUGHES LANE IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1430 080.78705 (4,261) INSTALL 1,800 FEET OF 6 INCH POLY AND ABANDON 1,800 FEET OF 6 INCH STEEL ALONG RIGHT OF WAY CROSSING BRAZOS RIVER AND LAKE SHORE DRIVE IN WACO, MCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY 1431 080.78713 (24,942) INSTALL 1,255 FEET OF 2 INCH, 350 FEET OF 4 INCH, 1,295 FEET OF 6 INCH POLY AND ABANDON 1,525 FEET OF 6 INCH STEEL ALONG HOUSTON AVENUE, AND MAIN STREET IN TEMPLE, BELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY 1432 080.78733 (211) ABANDON 220 FEET OF 3 INCH POLY NEAR THE INTERSECTION OF COOPER CREEK ROAD AND US 380 IN DENTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY 1433 080.78739 (217) INSTALL 5 FEET OF 4 INCH NEAR THE INTERSECTION OF AVENUE A AND WEST MULBERRY STREET IN DENTON AND ABANDON 5 FEET OF 4 INCH POLY. ALL CUSTOMERS DENTON SYSTEM INTEGRITY 1434 080.78741 (139,554) INSTALL 17 FARM TAPS BETWEEN KC29 AND KC30 IN CLYDE AND ABANDON 17 FARM TAPS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLYDE SYSTEM INTEGRITY MTX Retirements Page 42 of 45 542 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 1435 080.78757 (1,622) INSTALL 165 FEET OF 12 INCH STEEL AND ABANDON 140 FEET OF 12 INCH STEEL ALONG CHESTER AND MISSISSIPPI IN WICHITA FALLAS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1436 080.78781 (7,395) REPLACE RELIEF VALVE ON DISTRICT REGULATOR STATION #24 ALONG HIGHWAY 93 IN BELTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY 1437 080.78805 (727) ABANDON 385 FEET OF 2 INCH POLY ALONG WESTERN DRIVE IN BRYAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY 1438 080.78806 (71) RELOCATE FACILITIES. INSTALL 371 FEET OF 2 INCH POLY ALONG GREGG STREET AND ABANDON 48 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CALVERT SYSTEM INTEGRITY 1439 080.78810 (12) INSTALL 5 FEET OF 2 INCH POLY ALONG ELM STREET IN ALVORD AND ABANDON 5 FEET OF 2 INCH POLY ALL CUSTOMERS ALVORD SYSTEM INTEGRITY 1440 080.78823 (850) RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH POLY AND ABANDON 500 FEET OF 2 INCH POLY ALONG ROE STREET AND CENTRAL DIRVE IN AZLE, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AZLE SYSTEM INTEGRITY 1441 080.78831 (6,999) INSTALL 524 FEET OF 2 INCH POLY AND ABANDON 277 FEET OF 2 INCH POLY AND 213 FEET OF 2 INCH AND 204 FEET OF 4 INCH STEEL ALONG SOUTH LANE STREET, WEST SHOEMAKER AND WEST WARD IN DECATUR, WISE COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY 1442 080.78832 (297) RELOCATE FACILITIES. INSTALL 520 FEET OF 2 INCH POLY AND ABANDON 315 FEET OF 2 INCH STEEL ALONG THE STREETS OF GRANDVIEW, JOHNSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANDVIEW SYSTEM INTEGRITY 1443 080.78867 (478) INSTALL 375 FEET OF 2 INCH POLY ALONG EAST 2ND STREET AND MAIN STREET IN RHOME AND ABANDON 211 FEET OF 2 INCH, 126 FEET OF 4 INCH STEEL AND 8 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RHOME SYSTEM INTEGRITY 1444 080.78868 (10,484) INSTALL TWO (2) AC UNITS AT ABILENE SERVICE CENTER ON ARNOLD BOULEVARD AND ABANDON TWO (2) AC UNIT AT ABILENE SERVICE CENTER, ABILENE, TAYLOR COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES 1445 080.78877 (30,313) INSTALL 750 FEET OF 4 INCH POLY ALONG BAIRD STREET IN CLEBURNE AND ABANDON 7870 FEET OF 4 INCH STEEL AND 130 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY 1446 080.78884 (1,150) RELOCATE FACILITIES. INSTALL 787 FEET OF 2 INCH POLY ALONG ARROW POINT DRIVE AND WHITESTONE BOULEVARD IN CEDAR PARK, WILLIAMSON COUNTY AND ABANDON 594 FEET OF 2 INCH POLY.ALL CUSTOMERS CEDAR PARK RELOCATION OF FACILITIES 1447 080.78892 (1,615) INSTALL 550 FEET OF 4 INCH POLY ALONG NORTH MAIN STREET AND ABANDON 535 FEET OF 6 INCH STEEL IN PARIS, LAMAR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY 1448 080.78895 (1,627) INSTALL FLOWSAFE RELIEF VALVE AND ABANDON DEAD WEIGHT RELIEF VALVE ON DISTRICT REGULATOR STATION DRS70 IN ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY 1449 080.78896 (27,240) INSTALL RELIEF VALVE AT BRYAN DISTRICT REGULATOR STATION DRS34 AT THE INTERSECTION OF MILLS AND EAST 27TH STREET IN BRYAN, BRAZOS COUNTY AND ABANDON RELIEF VALVE AT BRYAN DISTRICT REGULATOR STATION DRS34 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY 1450 080.78898 (705) INSTALL DISTRICT REGULATOR STATION DRS03, 25 FEET OF 4 INCH, 25 FEET OF 2 INCH POLY NEAR THE INTERSECTION OF NORTH ALAMO STREET AND WEST BELL STREET IN BARTLETT, BELL COUNTY AND ABANDON 10 FEET OF 3 INCH, 20 FEET OF 4 INCH STEEL AND 3 FEET OF 3 INCH POLY AND DISTRICT REGULATOR STATION DRS03 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BARTLETT SYSTEM INTEGRITY 1451 080.78945 (14,763) ABANDON 820 FEET OF 2 INCH STEEL, AND 845 FEET OF 2 INCH, 775 FEET OF 1.25 INCH POLY ALONG SHADY GROVE ROAD, GRAND PRAIRIE, DALLAS COUNTY ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY 1452 080.78957 (6,402) INSTALL 1,520 FEET OF 2 INCH, 110 FEET OF 4 INCH POLY ALONG NORTH RIDGE ROAD, TEE HEAD DRIVE AND GREENFIELD ROAD IN FORT WORTH, TARRANT COUNTY AND ABANDON 90 FEET OF 4 INCH, 415 FEET OF 2 INCH STEEL AND 825 FEET OF 2 INCH AND 180 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1453 080.78971 (5,236) RELOCATE FACILITIES. INSTALL 415 FEET OF 6 INCH AND 25 FEET OF 3 INCH POLY AND ABANDON 360 FEET OF 6 INCH AND 90 FEET OF 4 INCH STEEL ALONG THE RIGHT OF WAY OF NORTH PEARL STREET BETWEEN WEST 11TH AVENUE AND WEST 10TH AVENUE IN BELTON, BELL COUNTY.ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY 1454 080.78979 (14,607) INSTALL 950 FEET OF 2 INCH, 250 FEET OF 4 INCH POLY AND ABANDON 1,250 FEET OF 2 INCH STEEL ALONG DOGWOOD TRAIL IN LANCASTER, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY 1455 080.78981 (2,767) INSTALL 1,600 FEET OF 4 INCH, 600 FEET OF 2 INCH POLY AND ABANDON 1,600 FEET OF 4 INCH, 500 FEET OF 4 INCH, 160 FEET OF 2 INCH STEEL ALONG COLLEGE HILLS STREET IN SAN ANGELO, TOM GREEN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY 1456 080.78983 (795) INSTALL 418 FEET OF 2 INCH POLY AND ABANDON 368 FEET OF 2 INCH STEEL AND 50 FEET OF 2 INCH POLY IN ROCHESTER, HASKELL COUNTY. ALL CUSTOMERS ROCHESTER RELOCATION OF FACILITIES 1457 080.78992 (5,406) RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG TOPHILL LANE ALLEY AND ABANDON 900 FEET OF 3 INCH STEEL TO ACCOMODATE THE CITY OF DALLAS ALLEY PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1458 080.79001 (780) INSTALL 400 FEET OF 4 INCH POLY ALONG FM 91 AND 2379 AND ABANDON 400 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ODELL SYSTEM INTEGRITY 1459 080.79012 (16,930) ABANDON 460 FEET OF 6 INCH POLY ALONG THE STREETS OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1460 080.79040 (32,628) ABANDON 4,200 FEET OF 1.25, 1,200 FEET OF 2 INCH POLY ALONG THE STREETS OF KILLEEN, BELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS KILLEEN SYSTEM INTEGRITY 1461 080.79064 (3,804) RELOCATE FACILITIES. RELOCATE TWENTY ONE .75 POLY SERVICES ALONG ALLEY BETWEEN HUNTINGTON AND LAWLER IN GARLAND, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1462 080.79117 (6,361) INSTALL 12 FEET OF 6 INCH POLY ALONG ALMA DRIVE AND ABADNON 8 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF PLANO SEWER AND STREET PROJECT IN PLANO, COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS PLANO SYSTEM INTEGRITY 1463 080.79126 (18,098) INSTALL 2,281 FEET 6 INCH, 202 FEET 4 INCH, 814 FEET 2 INCH AND ABANDON 2,200 FEET 6 INCH, 160 FEET 3 INCH, 150 FEET 2 INCH STEEL AND 50 FEET 4 INCH, 50 FEET 1.25 INCH POLY ALONG AVENUE A AND 33RD STREET IN SNYDER, SCURRY COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY 1464 080.79137 (808) INSTALL DISTRICT REGULATOR STATION DRS06, 10 FEET OF 6 INCH, 80 FEET OF 2IN CH, AND 40 FEET OF 4 INCH POLY AND ABANDON 10 FEET OF 6 INCH, 10 FEET OF 2 INCH, AND 40 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION DRS06 AT INTERSECTION OF ELIZABETH BOULEVARD AND S RAUPE LANE IN GRANBURY, HOOD COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY 1465 080.79150 (1,361) INSTALL 600 FEET OF 2 INCH, 10 FEET OF 6 INCH POLY AND ABANDON 600 FEET OF 2 INCH, 10 FEET OF 6 INCH STEEL ALONG GULF STREET IN CLARKSVILLE, RED RIVER COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLARKSVILLE SYSTEM INTEGRITY 1466 080.79156 (16) INSTALL 50 FEET OF 2 INCH POLY ALONG COLE AND 6TH IN BELLEVUE AND ABANDON 50 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BELLEVUE SYSTEM INTEGRITY 1467 080.79159 (730) INSTALL DISTRICT REGULATOR DRS06 AT THE INTERSECTION OF EAST OLIVER AND NORTH SWENSON IN STAMFORD, JONES COUNTY AND ABANDON DISTRICT REGULATOR STATION DRS06 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY 1468 080.79209 (1,542) RELOCATE FACILITIES. INSTALL 550 FEET OF 2 INCH POLY AND ABANDON 550 FEET OF 2 INCH STEEL ALONG FRONT AND ELM STREET IN ARLINGTON, TARRANT COUNTY TO ACCOMMODATE THE CITY OF ARLINGTON DRAINAGE AND PAVING PLAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY 1469 080.79226 (1,241) RELOCATE FACILITIES. INSTALL 690 FEET OF 2 INCH POLY AND ABANDON 580 FEET OF 2 INCH STEEL ALONG QUAIL TRAIL IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY MTX Retirements Page 43 of 45 543 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 1470 080.79228 (825) RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH, 60 FEET OF 4 INCH POLY AND ABANDON 50 FEET OF 6 INCH AND 60 FEET OF 4 INCH STEEL ALONG NEWTON DRIVE IN BURLESON, JOHNSON COUNTY TO ACCOMMODATE CITY OF BURLESON PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY 1471 080.79253 (420) INSTALL DISTRICT REGULATOR STATION DRS07 RELIEF VALVE ALONG INTERSECTION OF SOUTH AUSTIN AVENUE AND W FIFTH STREET IN GEORGETOWN, WILLIAMSON COUNTY AND ABANDON DISTRICT REGULATOR STATION DRS07 RELIEF VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY 1472 080.79288 (326) INSTALL 235 FEET OF 4 INCH POLY AND ABANDON 235 FEET OF 4 INCH POLY ALONG THE STREETS OF GREENWAY SUBDIVISION IN CELINA, COLLIN COUNTY. ALL CUSTOMERS CELINA RELOCATION OF FACILITIES 1473 080.79354 (20,332) ABANDON 50 FEET OF 8 INCH POLY ALONG THE STREETS OF SAPPHIRE BAY DEVELOPMENT IN ROWLETT, DALLAS COUNTY. ALL CUSTOMERS ROWLETT SYSTEM INTEGRITY 1474 080.79371 (208) CAPITAL REMEDIATION LINE CUT OUT ON LINE C16(EAST)AND STOPPLEING REQUIRED TO COMPLETE THE CUT OUT IN IRVING, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY 1475 080.79374 (5,307) RELOCATE FACILITIES. INSTALL 1,070 FEET OF 4 INCH POLY AND ABANDON 1,070 FEET OF 2 INCH STEEL ALONG THE STREETS OF FORT WORTH TO ACCOMODATE CITY OF FORT WORTH SANITARY SEWER PROJECT IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY 1476 080.79388 (1,169) INSTALL 330 FEET OF 4 INCH POLY ALONG INDEPENDENCE PARKWAY IN PLANO, COLLIN COUNTY AND ABANDON 330 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY 1477 080.79411 (15,918) INSTALL 1,900 FEET OF 8 INCH, 600 FEET OF 4 INCH AND 120 FEET OF 2 INCH POLY AND ABANDON 845 FEET OF 6 INCH, 80 FEET OF 3 INCH STEEL AND 60 FEET OF 6 INCH, 1,000 FEET OF 4 INCH, 80 FEET OF 2 INCH POLY ALONG COLLEGE HILL BOULEVARD IN SAN ANGELO IN TOM GREEN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY 1478 080.79440 (1,706) INSTALL 338 FEET OF 6 INCH AND 97 FEET OF 4 INCH POLY AND ABANDON 338 FEET OF 6 INCH POLY AND 98 FEET OF 4 INCH POLY ALONG WASHINGTON AVENUE IN BRYAN, BRAZOS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY 1479 080.79485 (381) INSTALL RELIEF VALVE ON DISTRICT REGULATOR STATION DRS21 AT THE INTERSECTION OF WILLOW AND NORTH JACKSON IN SAN ANGELO, TOM BEAN COUNTY AND ABANDON RELIEF VALVE ON DISTRICT REGULATOR STATION DRS21 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY 1480 080.79529 (2,906) INSTALL DISTRICT REGULATOR STATION DRS05, 80 FEET OF 4 INCH AND 40 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS05, 40 FEET OF 3 INCH STEEL, 40 FEET OF 2 INCH AND 40 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY 1481 080.79546 (3,604) INSTALL 350 FEET OF 4 INCH POLY AND ABANDON 350 FEET OF 4 INCH POLY ALONG ENTERPRISE STREET IN ATHENS, HENDERSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY 1482 080.79557 (690) INSTALL 600 FEET OF 2 INCH POLY AND 120 FEET OF 4 INCH STEEL AND ABANDON 110 FEET OF 2 INCH POLY AND 490 FEET OF 2 INCH STEEL ALONG EARLY BOULEVARD IN EARLY, BROWN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS EARLY SYSTEM INTEGRITY 1483 080.79565 (2,191) INSTALL 440 FEET OF 4 INCH, 10 FEET OF 2 INCH POLY AND ABANDON 440 FEET OF 6 INCH, 5 FEET OF 2 INCH STEEL ALONG MESQUITE STREET IN COLEMAN, COLEMAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY 1484 080.79575 (78,948) INSTALL 500 FEET OF 4 INCH, 120 FEET OF 2 INCH, 20 FEET OF 1.25 INCH POLY AND ABANDON 500 FEET OF 8 INCH, 120 FEET OF 2 INCH AND 20 FEET OF 1.25 INCH STEEL ALONG 11TH STREET IN CARLSBAD, TOM GREEN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARLSBAD SYSTEM INTEGRITY 1485 080.79617 (834) INSTALL DISTRICT REGULATOR STATION DRS06 AND 40 FEET OF 2 INCH, 120 FEET OF 4 INCH POLY AND NEW HIGH FLOW STATION 2X4 STATION AND ABANDON 20 FEET OF 3 INCH, 55 FEET OF 4 INCH STEEL AND 65 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION DRS06 ALONG EAST 6TH STREET AND CEDAR STREET IN COLORADO CITY, MITCHELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS COLORADO CITY SYSTEM INTEGRITY 1486 080.79640 (151) ABANDON 55 FEET OF 3 INCH POLY ALONG ELM STREET IN MCKINNEY, COLLIN COUNTY. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY 1487 080.79655 (191) INSTALL 325 FEET OF 2 INCH POLY AND ABANDON 80 FEET OF 3 INCH, 240 FEET OF 2 INCH STEEL ALONG 1ST STREET IN MILES, RUNNELS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILES SYSTEM INTEGRITY 1488 080.79704 (715) INSTALL 4 INCH VALVE LOCATED AT WICHITA FALLS WEST CITY GATE ALONG SEYMOUR HIGHWAY IN WICHITA FALLS, WICHITA COUNTY AND ABANDON EMR-107 VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY 1489 080.79706 (5,991) INSTALL 880 FEET OF 6 INCH, 120 FEET OF 2 INCH, 80 FEET OF 4 INCH POLY AND ABANDON 860 FEET OF 6 INCH, 120 FEET OF 2 INCH STEEL ALONG PAINT ROCK ROAD IN SAN ANGELO, TOM GREEN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY 1490 080.79727 (30) INSTALL 40 FEET OF 4 INCH, 10 FEET OF 2 INCH POLY AND ABANDON 40 FEET OF 4 INCH, 10 FEET OF 2 INCH STEEL ALONG THE STREETS OF CISCO IN CISCO, EASTLAND COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CISCO SYSTEM INTEGRITY 1491 080.79731 (2,624) REPAIR LEAK ALONG LINE M NEAR ALVARADO, JOHNSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALVARADO SYSTEM INTEGRITY 1492 080.79744 (3,609) INSTALL 400 FEET OF 4 INCH, 100 FEET OF 6 INCH POLY AND ABANDON 400 FEET OF 3 INCH, 100 FEET OF 6 INCH STEEL IN ALLEY SOUTH OF 6TH AT ELBERT STREET IN QUANAH, HARDEMAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS QUANAH SYSTEM INTEGRITY 1493 080.79781 (1,737) INSTALL 20 FEET OF 4 INCH, 170 FEET OF 2 INCH POLY AND ABANDON 20 FEET OF 4 INCH AND 170 FEET OF 2 INCH STEEL ALONG THE STREETS OF DE LEON, COMANCHE COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DE LEON SYSTEM INTEGRITY 1494 080.79846 (23,903) INSTALL DISTRICT REGLATOR STATION DRS38, NEW REGULATOR AND RELIEF VALVE, AND 25 FEET OF 2 INCH, 25 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS38 AT INTERSECTION OF GURLEY AVENUE AND SOUTH 21ST STREET IN WACO, MCCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY 1495 080.79879 (11,173) PROCEEDS OF SALE OF 2 ACRES IN COLEMAN, COLEMAN COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES 1496 080.79901 (400) INSTALL 5 FEET OF 2 INCH POLY AND ABANDON 5 FEET OF 2 INCH POLY ALONG SOUTH MAIN STREET IN RHOME, WISE COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RHOME SYSTEM INTEGRITY 1497 080.79930 (3,283,011) PROCEEDS OF 9.792 ACRES (CONSISTING OF A 7.692 ACRE TRACT KNOWN LOCALLY AS 100 W. MORNINGSIDE DRIVE) AND A 2.10 ACRE TRACT (KNOWN LOCALLY AS 401 PAGE STREET) SITUATED IN FORT WORTH, TARRANT COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES 1498 080.79938 (26,264) INSTALL 10 INCH SPLIT SLEEVE ALONG GOODWIN AT DELMAR IN DALLAS, DALLAS COUNTY AND ABANDON SERVICE TAP IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY 1499 080.80084 (161) INSTALL 50 FEET OF 2 INCH POLY AND ABANDON 40 FEET OF 2 INCH POLY ALONG JOHN KENNEDY AT LEATHERHEAD IN SAGINAW, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY 1500 080.80147 (1,473) ABANDON 350 FEET OF 6 INCH STEEL ALONG CENTERVILLE AND O'BANION IN GARLAND, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY 1501 080.80169 (7) INSTALL 5 FEET OF 2 INCH POLY AND ABANDON 5 FEET OF 2 INCH POLY ALONG HOUSTON STREET IN TERRELL, KAUFMAN COUNTY. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY 1502 080.80448 (5,516) INSTALL ONE (1) AC UNIT IN ABILENE SERVICE CENTER IN ABILENE, TAYLOR COUNTY AND ABANDON ONE (1) AC UNIT IN ABILENE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES 1503 ADMIN 080 (6,937,233) RETIREMENT OF STRUCTURES AND IMPROVEMENTS. ALL CUSTOMERS SYSTEM WIDE RETIREMENTS AND ADJUSTMENTS 1504 ADMIN 080 370,659 RETIREMENT OF STRUCTURES AND IMPROVEMENTS. ALL CUSTOMERS SYSTEM WIDE RETIREMENTS AND ADJUSTMENTS 1505 OTHER (249,636) RECORDED RETIREMENTS PENDING CLOSING PROJECT DETAIL. ALL CUSTOMERS SYSTEM WIDE RETIREMENTS AND ADJUSTMENTS MTX Retirements Page 44 of 45 544 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT 1506 TOTAL MTX RETIREMENTS (LN. 1 - LN. 1505) (86,216,397) 1507 1508 TOTAL CHANGE IN MTX UTILITY PLANT PER BOOK (LN. 1506 + MTX ADDITIONS LN. 6299) (3) 977,630,154 1509 1510 1511 NOTES: 1512 (1) The "COST" column reflects the capitalized portion of the cost only. 1513 (2) The "DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CALENDAR YEAR 2022" column describes capitalized costs only. 1514 (3) This amount represents per book and does not include net plant adjustments. MTX Retirements Page 45 of 45 545 Item 10. ATMOS ENERGY CORP., MID-TEX DIVISION INTERIM RATE ADJUSTMENT APPLICATION PROJECT REPORT 2022 RETIREMENTS BY FERC ACCOUNT 546 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.49148 37601 (117,871) 080 190 - Mid-Tex Gas Division Retirement 080.52108 37601 (13,995) 080 190 - Mid-Tex Gas Division Retirement 080.52108 37602 (8,427) 080 190 - Mid-Tex Gas Division Retirement 080.52108 38000 (8,959) 080 190 - Mid-Tex Gas Division Retirement 080.54137 37601 (146) 080 190 - Mid-Tex Gas Division Retirement 080.56871 37602 136 080 190 - Mid-Tex Gas Division Retirement 080.58753 38000 (3,200) 080 190 - Mid-Tex Gas Division Retirement 080.60447 37601 (1,934) 080 190 - Mid-Tex Gas Division Retirement 080.60447 37602 (13,707) 080 190 - Mid-Tex Gas Division Retirement 080.60447 38000 (1,670) 080 190 - Mid-Tex Gas Division Retirement 080.61247 38000 (17,437) 080 190 - Mid-Tex Gas Division Retirement 080.61594 37601 (637,972) 080 190 - Mid-Tex Gas Division Retirement 080.61594 37602 (234,375) 080 190 - Mid-Tex Gas Division Retirement 080.61594 38000 (3,052,020) 080 190 - Mid-Tex Gas Division Retirement 080.61595 37601 (121,356) 080 190 - Mid-Tex Gas Division Retirement 080.61595 37602 (279,038) 080 190 - Mid-Tex Gas Division Retirement 080.61595 38000 (51,525) 080 190 - Mid-Tex Gas Division Retirement 080.62093 37601 8 080 190 - Mid-Tex Gas Division Retirement 080.62093 37602 506 080 190 - Mid-Tex Gas Division Retirement 080.62714 37601 20,649 080 190 - Mid-Tex Gas Division Retirement 080.62714 37602 10,205 080 190 - Mid-Tex Gas Division Retirement 080.62738 37601 (433,540) 080 190 - Mid-Tex Gas Division Retirement 080.62738 37602 (39,074) 080 190 - Mid-Tex Gas Division Retirement 080.62738 38000 (4,857) 080 190 - Mid-Tex Gas Division Retirement 080.63644 37601 (100,921) 080 190 - Mid-Tex Gas Division Retirement 080.63945 37601 (7,567) 080 190 - Mid-Tex Gas Division Retirement 080.63945 37602 (51) 080 190 - Mid-Tex Gas Division Retirement 080.63945 37800 (36,781) 080 190 - Mid-Tex Gas Division Retirement 080.63945 38000 (497) 080 190 - Mid-Tex Gas Division Retirement 080.64366 38000 1,302 080 190 - Mid-Tex Gas Division Retirement 080.64399 37602 (4,765) 080 190 - Mid-Tex Gas Division Retirement 080.64399 38000 (2,358) 080 190 - Mid-Tex Gas Division Retirement 080.65103 37601 (430,261) 080 190 - Mid-Tex Gas Division Retirement 080.65103 37602 (1,867) 080 190 - Mid-Tex Gas Division Retirement 080.65103 37800 (205,653) 080 190 - Mid-Tex Gas Division Retirement 080.65103 38500 3,358 080 190 - Mid-Tex Gas Division Retirement 080.65275 38000 1,827 080 190 - Mid-Tex Gas Division Retirement 080.65516 37601 123 080 190 - Mid-Tex Gas Division Retirement 080.65516 37602 (1,099) 080 190 - Mid-Tex Gas Division Retirement 080.65651 37601 10 080 190 - Mid-Tex Gas Division Retirement 080.65651 37602 (308) 080 190 - Mid-Tex Gas Division Retirement 080.65674 37601 (27) 080 190 - Mid-Tex Gas Division Retirement 080.65674 37602 (177) 080 190 - Mid-Tex Gas Division Retirement 080.65674 37800 (22,352) 080 190 - Mid-Tex Gas Division Retirement 080.65697 37601 (10) 080 190 - Mid-Tex Gas Division Retirement 080.65704 37601 (194) 080 190 - Mid-Tex Gas Division Retirement 080.65704 37602 (102) 080 190 - Mid-Tex Gas Division Retirement 080.65704 37800 (1,603) 080 190 - Mid-Tex Gas Division Retirement 080.65704 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.65744 37601 (37,371) 080 190 - Mid-Tex Gas Division Retirement 080.65744 37602 (1,688) 080 190 - Mid-Tex Gas Division Retirement 080.65744 37800 (107,569) 080 190 - Mid-Tex Gas Division Retirement 080.65795 37601 (693) 080 190 - Mid-Tex Gas Division Retirement 080.65795 37602 (602) 080 190 - Mid-Tex Gas Division Retirement 080.65795 38000 (2,145) 080 190 - Mid-Tex Gas Division Retirement 080.65805 37601 (111) 080 190 - Mid-Tex Gas Division Retirement 080.65805 37602 (152) 080 190 - Mid-Tex Gas Division Retirement 080.65805 37800 (16,076) 080 190 - Mid-Tex Gas Division Retirement 080.65807 37601 528 080 190 - Mid-Tex Gas Division Retirement 080.65807 37602 155 080 190 - Mid-Tex Gas Division Retirement 080.65821 37601 (257) 080 190 - Mid-Tex Gas Division Retirement 080.65821 37602 (414) 080 190 - Mid-Tex Gas Division Retirement 080.65821 37800 (2,345) 080 190 - Mid-Tex Gas Division Retirement 080.65842 37800 (10,436) 080 190 - Mid-Tex Gas Division Retirement 080.65858 37601 (11,056) 080 190 - Mid-Tex Gas Division Retirement 080.65858 37602 (29,874) 080 190 - Mid-Tex Gas Division Retirement 080.65858 37800 (6,584) 080 190 - Mid-Tex Gas Division Retirement 080.65862 37601 (459) 080 190 - Mid-Tex Gas Division Retirement 080.65862 37602 (7,410) 080 190 - Mid-Tex Gas Division Retirement 080.65862 37800 (8,970) 080 190 - Mid-Tex Gas Division Retirement 080.65865 37601 (768) 080 190 - Mid-Tex Gas Division Retirement 080.65865 37602 (141) 080 190 - Mid-Tex Gas Division Retirement 080.65865 37800 (1,175) 080 190 - Mid-Tex Gas Division Retirement 080.65879 37601 12,705 080 190 - Mid-Tex Gas Division Retirement 080.65879 37602 (198) 080 190 - Mid-Tex Gas Division Retirement 080.65879 38000 371 080 190 - Mid-Tex Gas Division Retirement 080.66044 37601 (102,301) 080 190 - Mid-Tex Gas Division Retirement 080.66262 37601 (2,303) 080 190 - Mid-Tex Gas Division Retirement 080.66262 37602 (1,845) 080 190 - Mid-Tex Gas Division Retirement 080.66262 38000 (89) 080 190 - Mid-Tex Gas Division Retirement 080.66557 37601 (6,011) 080 190 - Mid-Tex Gas Division Retirement 080.66564 38000 (793) 080 190 - Mid-Tex Gas Division Retirement 080.66654 37601 (9,251) 080 190 - Mid-Tex Gas Division Retirement 080.66654 38000 (310) 080 190 - Mid-Tex Gas Division Retirement 080.66666 37601 (5,532,859) 080 190 - Mid-Tex Gas Division Retirement 080.66673 37601 (25) 080 190 - Mid-Tex Gas Division Retirement 080.66673 37602 (421) 080 190 - Mid-Tex Gas Division Retirement 080.66728 37601 86 080 190 - Mid-Tex Gas Division Retirement 080.66728 38000 (3,194) 080 190 - Mid-Tex Gas Division Retirement 080.66755 37601 17 080 190 - Mid-Tex Gas Division Retirement 080.66755 37602 (81) 080 190 - Mid-Tex Gas Division Retirement 080.66755 38000 (137) 080 190 - Mid-Tex Gas Division Retirement 080.66775 37601 1,724 080 190 - Mid-Tex Gas Division Retirement 080.66809 37601 (16,624) 080 190 - Mid-Tex Gas Division Retirement 080.67075 37602 (5,826) 080 190 - Mid-Tex Gas Division Retirement 080.67347 38000 (136) 080 190 - Mid-Tex Gas Division Retirement 080.67748 38000 (888) 080 190 - Mid-Tex Gas Division Retirement 080.67855 37602 (3,236) 080 190 - Mid-Tex Gas Division Retirement 080.68373 37601 (891) 080 190 - Mid-Tex Gas Division Retirement 080.68373 37602 (37,350) 080 190 - Mid-Tex Gas Division Retirement 080.68429 37601 628,735 080 190 - Mid-Tex Gas Division Retirement 080.68429 37602 10,316 080 190 - Mid-Tex Gas Division Retirement 080.68474 37601 76 080 190 - Mid-Tex Gas Division Retirement 080.68474 38000 (1,263) 080 190 - Mid-Tex Gas Division Retirement 080.68503 37601 (544) 080 190 - Mid-Tex Gas Division Retirement 080.68503 38000 (353) 080 190 - Mid-Tex Gas Division Retirement 080.68576 37601 (1,839) MTX Retirements by FERC Page 1 of 30 547 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.68954 37601 (23,690) 080 190 - Mid-Tex Gas Division Retirement 080.69221 37602 (89,805) 080 190 - Mid-Tex Gas Division Retirement 080.69221 38000 (450) 080 190 - Mid-Tex Gas Division Retirement 080.69341 37601 1,322 080 190 - Mid-Tex Gas Division Retirement 080.69341 37602 (6,234) 080 190 - Mid-Tex Gas Division Retirement 080.69341 38000 647 080 190 - Mid-Tex Gas Division Retirement 080.69404 37602 (338) 080 190 - Mid-Tex Gas Division Retirement 080.69404 38000 (665) 080 190 - Mid-Tex Gas Division Retirement 080.69414 37602 (450) 080 190 - Mid-Tex Gas Division Retirement 080.69414 38000 (1,405) 080 190 - Mid-Tex Gas Division Retirement 080.69599 38000 (51) 080 190 - Mid-Tex Gas Division Retirement 080.69629 37602 759 080 190 - Mid-Tex Gas Division Retirement 080.69719 38000 120 080 190 - Mid-Tex Gas Division Retirement 080.69878 37602 493 080 190 - Mid-Tex Gas Division Retirement 080.69932 37602 (531) 080 190 - Mid-Tex Gas Division Retirement 080.69932 38000 (252) 080 190 - Mid-Tex Gas Division Retirement 080.70046 37601 (1,945) 080 190 - Mid-Tex Gas Division Retirement 080.70046 38000 (11,026) 080 190 - Mid-Tex Gas Division Retirement 080.70161 37601 543 080 190 - Mid-Tex Gas Division Retirement 080.70161 37602 (1,079) 080 190 - Mid-Tex Gas Division Retirement 080.70193 37601 (5,349) 080 190 - Mid-Tex Gas Division Retirement 080.70193 37602 (82) 080 190 - Mid-Tex Gas Division Retirement 080.70194 37601 (157,930) 080 190 - Mid-Tex Gas Division Retirement 080.70194 37602 (4,085) 080 190 - Mid-Tex Gas Division Retirement 080.70195 37601 (484,003) 080 190 - Mid-Tex Gas Division Retirement 080.70195 37602 (8,462) 080 190 - Mid-Tex Gas Division Retirement 080.70196 37601 (63,479) 080 190 - Mid-Tex Gas Division Retirement 080.70196 37602 (7,986) 080 190 - Mid-Tex Gas Division Retirement 080.70197 37601 (594) 080 190 - Mid-Tex Gas Division Retirement 080.70197 37602 (1,677) 080 190 - Mid-Tex Gas Division Retirement 080.70198 37601 (493) 080 190 - Mid-Tex Gas Division Retirement 080.70199 37601 (1,435) 080 190 - Mid-Tex Gas Division Retirement 080.70199 37602 (172) 080 190 - Mid-Tex Gas Division Retirement 080.70200 37601 (1,473) 080 190 - Mid-Tex Gas Division Retirement 080.70200 37602 (472) 080 190 - Mid-Tex Gas Division Retirement 080.70201 37601 (41,020) 080 190 - Mid-Tex Gas Division Retirement 080.70201 37602 (2,283) 080 190 - Mid-Tex Gas Division Retirement 080.70202 38000 (55,398) 080 190 - Mid-Tex Gas Division Retirement 080.70203 38000 (195,109) 080 190 - Mid-Tex Gas Division Retirement 080.70204 38000 (138,106) 080 190 - Mid-Tex Gas Division Retirement 080.70205 38000 (37,376) 080 190 - Mid-Tex Gas Division Retirement 080.70206 38000 (48,162) 080 190 - Mid-Tex Gas Division Retirement 080.70207 38000 (4,691) 080 190 - Mid-Tex Gas Division Retirement 080.70208 38000 (23,295) 080 190 - Mid-Tex Gas Division Retirement 080.70209 38000 (4,599) 080 190 - Mid-Tex Gas Division Retirement 080.70210 38000 (134,626) 080 190 - Mid-Tex Gas Division Retirement 080.70211 37601 (462) 080 190 - Mid-Tex Gas Division Retirement 080.70211 37602 (2,094) 080 190 - Mid-Tex Gas Division Retirement 080.70212 37601 (53,724) 080 190 - Mid-Tex Gas Division Retirement 080.70212 37602 (6,087) 080 190 - Mid-Tex Gas Division Retirement 080.70213 37601 (17,224) 080 190 - Mid-Tex Gas Division Retirement 080.70213 37602 (1,170) 080 190 - Mid-Tex Gas Division Retirement 080.70214 37601 (3,030) 080 190 - Mid-Tex Gas Division Retirement 080.70214 37602 (11,255) 080 190 - Mid-Tex Gas Division Retirement 080.70215 37601 (34) 080 190 - Mid-Tex Gas Division Retirement 080.70215 37602 (189) 080 190 - Mid-Tex Gas Division Retirement 080.70216 37601 (110) 080 190 - Mid-Tex Gas Division Retirement 080.70216 37602 (87) 080 190 - Mid-Tex Gas Division Retirement 080.70217 37601 (107,746) 080 190 - Mid-Tex Gas Division Retirement 080.70217 37602 (3,324) 080 190 - Mid-Tex Gas Division Retirement 080.70218 37601 (39) 080 190 - Mid-Tex Gas Division Retirement 080.70218 37602 (1,493) 080 190 - Mid-Tex Gas Division Retirement 080.70219 37601 (32,905) 080 190 - Mid-Tex Gas Division Retirement 080.70219 37602 (844) 080 190 - Mid-Tex Gas Division Retirement 080.70220 38000 (150,221) 080 190 - Mid-Tex Gas Division Retirement 080.70221 38000 (110,564) 080 190 - Mid-Tex Gas Division Retirement 080.70222 38000 (196,314) 080 190 - Mid-Tex Gas Division Retirement 080.70223 38000 (562,015) 080 190 - Mid-Tex Gas Division Retirement 080.70224 38000 (180,808) 080 190 - Mid-Tex Gas Division Retirement 080.70225 38000 (47,411) 080 190 - Mid-Tex Gas Division Retirement 080.70226 38000 (180,865) 080 190 - Mid-Tex Gas Division Retirement 080.70227 38000 (73,608) 080 190 - Mid-Tex Gas Division Retirement 080.70228 38000 (137,189) 080 190 - Mid-Tex Gas Division Retirement 080.70229 38100 (850,133) 080 190 - Mid-Tex Gas Division Retirement 080.70229 38200 (461,221) 080 190 - Mid-Tex Gas Division Retirement 080.70229 38300 (257,705) 080 190 - Mid-Tex Gas Division Retirement 080.70230 38100 (1,451,175) 080 190 - Mid-Tex Gas Division Retirement 080.70230 38200 (443,784) 080 190 - Mid-Tex Gas Division Retirement 080.70230 38300 (249,183) 080 190 - Mid-Tex Gas Division Retirement 080.70231 38100 (631,797) 080 190 - Mid-Tex Gas Division Retirement 080.70231 38200 (317,150) 080 190 - Mid-Tex Gas Division Retirement 080.70231 38300 (186,244) 080 190 - Mid-Tex Gas Division Retirement 080.70232 38100 (1,720,560) 080 190 - Mid-Tex Gas Division Retirement 080.70232 38200 (595,539) 080 190 - Mid-Tex Gas Division Retirement 080.70232 38300 (351,655) 080 190 - Mid-Tex Gas Division Retirement 080.70233 38100 (1,741,565) 080 190 - Mid-Tex Gas Division Retirement 080.70233 38200 (512,139) 080 190 - Mid-Tex Gas Division Retirement 080.70233 38300 (283,865) 080 190 - Mid-Tex Gas Division Retirement 080.70234 38100 (455,510) 080 190 - Mid-Tex Gas Division Retirement 080.70234 38200 (283,499) 080 190 - Mid-Tex Gas Division Retirement 080.70234 38300 (141,351) 080 190 - Mid-Tex Gas Division Retirement 080.70235 38100 (642,367) 080 190 - Mid-Tex Gas Division Retirement 080.70235 38200 (324,752) 080 190 - Mid-Tex Gas Division Retirement 080.70235 38300 (180,102) 080 190 - Mid-Tex Gas Division Retirement 080.70236 38100 (486,066) 080 190 - Mid-Tex Gas Division Retirement 080.70236 38200 (242,931) 080 190 - Mid-Tex Gas Division Retirement 080.70236 38300 (131,420) 080 190 - Mid-Tex Gas Division Retirement 080.70237 38100 (593,248) 080 190 - Mid-Tex Gas Division Retirement 080.70237 38200 (317,444) 080 190 - Mid-Tex Gas Division Retirement 080.70237 38300 (192,307) 080 190 - Mid-Tex Gas Division Retirement 080.70252 37601 (251) 080 190 - Mid-Tex Gas Division Retirement 080.70252 38000 (749) 080 190 - Mid-Tex Gas Division Retirement 080.70260 37601 38 080 190 - Mid-Tex Gas Division Retirement 080.70260 37602 (648) 080 190 - Mid-Tex Gas Division Retirement 080.70307 38000 (81,264) 080 190 - Mid-Tex Gas Division Retirement 080.70308 38000 (68,160) 080 190 - Mid-Tex Gas Division Retirement 080.70309 38000 (93,308) MTX Retirements by FERC Page 2 of 30 548 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.70310 38000 (468,571) 080 190 - Mid-Tex Gas Division Retirement 080.70311 38000 (219,107) 080 190 - Mid-Tex Gas Division Retirement 080.70312 38000 (77,471) 080 190 - Mid-Tex Gas Division Retirement 080.70313 38000 (104,352) 080 190 - Mid-Tex Gas Division Retirement 080.70314 38000 (105,846) 080 190 - Mid-Tex Gas Division Retirement 080.70315 38000 (71,030) 080 190 - Mid-Tex Gas Division Retirement 080.70316 37601 (61) 080 190 - Mid-Tex Gas Division Retirement 080.70316 37602 (4,453) 080 190 - Mid-Tex Gas Division Retirement 080.70317 37601 (687) 080 190 - Mid-Tex Gas Division Retirement 080.70317 37602 (9,108) 080 190 - Mid-Tex Gas Division Retirement 080.70318 37601 (367) 080 190 - Mid-Tex Gas Division Retirement 080.70318 37602 (9,504) 080 190 - Mid-Tex Gas Division Retirement 080.70319 37601 (301) 080 190 - Mid-Tex Gas Division Retirement 080.70319 37602 (6,340) 080 190 - Mid-Tex Gas Division Retirement 080.70320 37602 (9,306) 080 190 - Mid-Tex Gas Division Retirement 080.70321 37601 (125) 080 190 - Mid-Tex Gas Division Retirement 080.70321 37602 (1,037) 080 190 - Mid-Tex Gas Division Retirement 080.70322 37601 (57) 080 190 - Mid-Tex Gas Division Retirement 080.70322 37602 (5,539) 080 190 - Mid-Tex Gas Division Retirement 080.70323 37602 (3,902) 080 190 - Mid-Tex Gas Division Retirement 080.70324 37601 (115) 080 190 - Mid-Tex Gas Division Retirement 080.70324 37602 (2,301) 080 190 - Mid-Tex Gas Division Retirement 080.70325 38100 (158,285) 080 190 - Mid-Tex Gas Division Retirement 080.70325 38200 (83,064) 080 190 - Mid-Tex Gas Division Retirement 080.70325 38300 (39,266) 080 190 - Mid-Tex Gas Division Retirement 080.70326 38100 (257,092) 080 190 - Mid-Tex Gas Division Retirement 080.70326 38200 (84,111) 080 190 - Mid-Tex Gas Division Retirement 080.70326 38300 (38,028) 080 190 - Mid-Tex Gas Division Retirement 080.70327 38100 (215,103) 080 190 - Mid-Tex Gas Division Retirement 080.70327 38200 (93,835) 080 190 - Mid-Tex Gas Division Retirement 080.70327 38300 (53,740) 080 190 - Mid-Tex Gas Division Retirement 080.70328 38100 (362,829) 080 190 - Mid-Tex Gas Division Retirement 080.70328 38200 (127,613) 080 190 - Mid-Tex Gas Division Retirement 080.70328 38300 (75,342) 080 190 - Mid-Tex Gas Division Retirement 080.70329 38100 (576,240) 080 190 - Mid-Tex Gas Division Retirement 080.70329 38200 (170,381) 080 190 - Mid-Tex Gas Division Retirement 080.70329 38300 (95,503) 080 190 - Mid-Tex Gas Division Retirement 080.70330 38100 (81,827) 080 190 - Mid-Tex Gas Division Retirement 080.70330 38200 (49,149) 080 190 - Mid-Tex Gas Division Retirement 080.70330 38300 (27,611) 080 190 - Mid-Tex Gas Division Retirement 080.70331 38100 (207,599) 080 190 - Mid-Tex Gas Division Retirement 080.70331 38200 (123,485) 080 190 - Mid-Tex Gas Division Retirement 080.70331 38300 (55,320) 080 190 - Mid-Tex Gas Division Retirement 080.70332 38100 (168,318) 080 190 - Mid-Tex Gas Division Retirement 080.70332 38200 (87,688) 080 190 - Mid-Tex Gas Division Retirement 080.70332 38300 (51,913) 080 190 - Mid-Tex Gas Division Retirement 080.70333 38100 (230,303) 080 190 - Mid-Tex Gas Division Retirement 080.70333 38200 (131,359) 080 190 - Mid-Tex Gas Division Retirement 080.70333 38300 (79,048) 080 190 - Mid-Tex Gas Division Retirement 080.70515 37601 137 080 190 - Mid-Tex Gas Division Retirement 080.70515 37602 (278) 080 190 - Mid-Tex Gas Division Retirement 080.70515 38000 2,615 080 190 - Mid-Tex Gas Division Retirement 080.70526 38000 (72) 080 190 - Mid-Tex Gas Division Retirement 080.70527 37601 (7) 080 190 - Mid-Tex Gas Division Retirement 080.70527 37602 43 080 190 - Mid-Tex Gas Division Retirement 080.70534 37601 (17) 080 190 - Mid-Tex Gas Division Retirement 080.70534 37602 (216) 080 190 - Mid-Tex Gas Division Retirement 080.70534 38000 (23) 080 190 - Mid-Tex Gas Division Retirement 080.70540 37601 (7) 080 190 - Mid-Tex Gas Division Retirement 080.70540 38000 (256) 080 190 - Mid-Tex Gas Division Retirement 080.70541 37601 (37) 080 190 - Mid-Tex Gas Division Retirement 080.70541 38000 200 080 190 - Mid-Tex Gas Division Retirement 080.70545 37601 (81) 080 190 - Mid-Tex Gas Division Retirement 080.70545 38000 (280) 080 190 - Mid-Tex Gas Division Retirement 080.70548 37601 1,470 080 190 - Mid-Tex Gas Division Retirement 080.70548 37602 12 080 190 - Mid-Tex Gas Division Retirement 080.70548 38000 1,731 080 190 - Mid-Tex Gas Division Retirement 080.70551 37601 (6,349) 080 190 - Mid-Tex Gas Division Retirement 080.70551 37602 (1,879) 080 190 - Mid-Tex Gas Division Retirement 080.70551 38000 483 080 190 - Mid-Tex Gas Division Retirement 080.70552 37601 (3,755) 080 190 - Mid-Tex Gas Division Retirement 080.70552 38000 129 080 190 - Mid-Tex Gas Division Retirement 080.70553 37601 (1,342) 080 190 - Mid-Tex Gas Division Retirement 080.70553 38000 (140) 080 190 - Mid-Tex Gas Division Retirement 080.70554 37601 (28) 080 190 - Mid-Tex Gas Division Retirement 080.70554 38000 (74) 080 190 - Mid-Tex Gas Division Retirement 080.70555 37601 54 080 190 - Mid-Tex Gas Division Retirement 080.70555 38000 (103) 080 190 - Mid-Tex Gas Division Retirement 080.70564 38000 413 080 190 - Mid-Tex Gas Division Retirement 080.70606 37601 (4,621) 080 190 - Mid-Tex Gas Division Retirement 080.70606 37602 (1,309) 080 190 - Mid-Tex Gas Division Retirement 080.70606 38000 (723) 080 190 - Mid-Tex Gas Division Retirement 080.70611 37601 (195) 080 190 - Mid-Tex Gas Division Retirement 080.70611 37602 (7,512) 080 190 - Mid-Tex Gas Division Retirement 080.70611 37800 (794) 080 190 - Mid-Tex Gas Division Retirement 080.70618 37601 (74) 080 190 - Mid-Tex Gas Division Retirement 080.70618 37602 (5,728) 080 190 - Mid-Tex Gas Division Retirement 080.70618 37800 (24,761) 080 190 - Mid-Tex Gas Division Retirement 080.70618 38000 (312) 080 190 - Mid-Tex Gas Division Retirement 080.70619 37601 (2,853) 080 190 - Mid-Tex Gas Division Retirement 080.70619 37602 (1,580) 080 190 - Mid-Tex Gas Division Retirement 080.70619 37800 (1,630) 080 190 - Mid-Tex Gas Division Retirement 080.70619 38000 (686) 080 190 - Mid-Tex Gas Division Retirement 080.70620 37601 (869) 080 190 - Mid-Tex Gas Division Retirement 080.70620 37602 (94) 080 190 - Mid-Tex Gas Division Retirement 080.70620 37800 (9,303) 080 190 - Mid-Tex Gas Division Retirement 080.70620 38000 (195) 080 190 - Mid-Tex Gas Division Retirement 080.70643 37601 (100) 080 190 - Mid-Tex Gas Division Retirement 080.70643 37800 (65,942) 080 190 - Mid-Tex Gas Division Retirement 080.70644 37601 (2,037) 080 190 - Mid-Tex Gas Division Retirement 080.70644 38000 (23,450) 080 190 - Mid-Tex Gas Division Retirement 080.70686 37601 (31,370) 080 190 - Mid-Tex Gas Division Retirement 080.70686 37602 (3,260) 080 190 - Mid-Tex Gas Division Retirement 080.70702 38000 355 080 190 - Mid-Tex Gas Division Retirement 080.70706 37601 40 080 190 - Mid-Tex Gas Division Retirement 080.70706 37602 (1,568) 080 190 - Mid-Tex Gas Division Retirement 080.70735 37601 (146) MTX Retirements by FERC Page 3 of 30 549 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.70810 37601 (664) 080 190 - Mid-Tex Gas Division Retirement 080.70810 37602 6,420 080 190 - Mid-Tex Gas Division Retirement 080.70810 38000 (17,850) 080 190 - Mid-Tex Gas Division Retirement 080.70840 38000 303 080 190 - Mid-Tex Gas Division Retirement 080.70855 38000 (1,087) 080 190 - Mid-Tex Gas Division Retirement 080.70903 37602 (205) 080 190 - Mid-Tex Gas Division Retirement 080.70936 37601 (48) 080 190 - Mid-Tex Gas Division Retirement 080.70936 37602 (1,408) 080 190 - Mid-Tex Gas Division Retirement 080.70954 37601 123 080 190 - Mid-Tex Gas Division Retirement 080.71018 38000 1,101 080 190 - Mid-Tex Gas Division Retirement 080.71021 38000 700 080 190 - Mid-Tex Gas Division Retirement 080.71031 37601 (581) 080 190 - Mid-Tex Gas Division Retirement 080.71031 38000 (1,974) 080 190 - Mid-Tex Gas Division Retirement 080.71033 37602 568 080 190 - Mid-Tex Gas Division Retirement 080.71033 38000 (5,731) 080 190 - Mid-Tex Gas Division Retirement 080.71043 37601 (7,638) 080 190 - Mid-Tex Gas Division Retirement 080.71107 37601 21 080 190 - Mid-Tex Gas Division Retirement 080.71126 38000 (8,450) 080 190 - Mid-Tex Gas Division Retirement 080.71129 37601 3,474 080 190 - Mid-Tex Gas Division Retirement 080.71129 37602 308 080 190 - Mid-Tex Gas Division Retirement 080.71129 38000 (2,940) 080 190 - Mid-Tex Gas Division Retirement 080.71130 37602 (1,739) 080 190 - Mid-Tex Gas Division Retirement 080.71168 37602 (261) 080 190 - Mid-Tex Gas Division Retirement 080.71174 37602 (5,520) 080 190 - Mid-Tex Gas Division Retirement 080.71177 37601 (12,255) 080 190 - Mid-Tex Gas Division Retirement 080.71177 37602 (161,424) 080 190 - Mid-Tex Gas Division Retirement 080.71177 38000 (5,869) 080 190 - Mid-Tex Gas Division Retirement 080.71224 37601 59 080 190 - Mid-Tex Gas Division Retirement 080.71224 37602 420 080 190 - Mid-Tex Gas Division Retirement 080.71224 38000 (169) 080 190 - Mid-Tex Gas Division Retirement 080.71255 37601 (2,839,533) 080 190 - Mid-Tex Gas Division Retirement 080.71294 38000 (200) 080 190 - Mid-Tex Gas Division Retirement 080.71302 38000 781 080 190 - Mid-Tex Gas Division Retirement 080.71303 38000 732 080 190 - Mid-Tex Gas Division Retirement 080.71304 37602 (113,418) 080 190 - Mid-Tex Gas Division Retirement 080.71368 38000 (1,955) 080 190 - Mid-Tex Gas Division Retirement 080.71369 37601 (406) 080 190 - Mid-Tex Gas Division Retirement 080.71369 38000 (85) 080 190 - Mid-Tex Gas Division Retirement 080.71387 37601 (13,079) 080 190 - Mid-Tex Gas Division Retirement 080.71387 37602 (2,884) 080 190 - Mid-Tex Gas Division Retirement 080.71387 38000 (10,363) 080 190 - Mid-Tex Gas Division Retirement 080.71412 37602 30,074 080 190 - Mid-Tex Gas Division Retirement 080.71412 38000 548 080 190 - Mid-Tex Gas Division Retirement 080.71429 37602 (9,609) 080 190 - Mid-Tex Gas Division Retirement 080.71467 37601 (8,060) 080 190 - Mid-Tex Gas Division Retirement 080.71467 37602 (13,761) 080 190 - Mid-Tex Gas Division Retirement 080.71467 37800 (29,350) 080 190 - Mid-Tex Gas Division Retirement 080.71467 38000 (2,954) 080 190 - Mid-Tex Gas Division Retirement 080.71517 37601 (2,490) 080 190 - Mid-Tex Gas Division Retirement 080.71517 37602 4,419 080 190 - Mid-Tex Gas Division Retirement 080.71517 38000 (1,862) 080 190 - Mid-Tex Gas Division Retirement 080.71522 37601 (2,966) 080 190 - Mid-Tex Gas Division Retirement 080.71522 37602 (7,791) 080 190 - Mid-Tex Gas Division Retirement 080.71522 37800 (39,456) 080 190 - Mid-Tex Gas Division Retirement 080.71528 38000 (188) 080 190 - Mid-Tex Gas Division Retirement 080.71531 37800 (4,647) 080 190 - Mid-Tex Gas Division Retirement 080.71532 37800 (75,197) 080 190 - Mid-Tex Gas Division Retirement 080.71534 38000 (2,461) 080 190 - Mid-Tex Gas Division Retirement 080.71567 37601 (6,301) 080 190 - Mid-Tex Gas Division Retirement 080.71592 37601 (112) 080 190 - Mid-Tex Gas Division Retirement 080.71592 38000 6,624 080 190 - Mid-Tex Gas Division Retirement 080.71607 38000 3,099 080 190 - Mid-Tex Gas Division Retirement 080.71647 38000 562 080 190 - Mid-Tex Gas Division Retirement 080.71648 37601 70 080 190 - Mid-Tex Gas Division Retirement 080.71648 37602 1,548 080 190 - Mid-Tex Gas Division Retirement 080.71648 38000 236 080 190 - Mid-Tex Gas Division Retirement 080.71703 37601 (1,727) 080 190 - Mid-Tex Gas Division Retirement 080.71703 37602 (187) 080 190 - Mid-Tex Gas Division Retirement 080.71703 38000 (1,810) 080 190 - Mid-Tex Gas Division Retirement 080.71710 37601 5,127 080 190 - Mid-Tex Gas Division Retirement 080.71710 37602 (140) 080 190 - Mid-Tex Gas Division Retirement 080.71710 38000 552 080 190 - Mid-Tex Gas Division Retirement 080.71716 37601 (15,592) 080 190 - Mid-Tex Gas Division Retirement 080.71716 37602 (3,404) 080 190 - Mid-Tex Gas Division Retirement 080.71716 37800 (1,434) 080 190 - Mid-Tex Gas Division Retirement 080.71716 38000 (15,714) 080 190 - Mid-Tex Gas Division Retirement 080.71738 37601 73,206 080 190 - Mid-Tex Gas Division Retirement 080.71738 37602 (172) 080 190 - Mid-Tex Gas Division Retirement 080.71738 38000 (71,940) 080 190 - Mid-Tex Gas Division Retirement 080.71760 37601 (47,793) 080 190 - Mid-Tex Gas Division Retirement 080.71760 37602 (1,157) 080 190 - Mid-Tex Gas Division Retirement 080.71760 38000 (2,849) 080 190 - Mid-Tex Gas Division Retirement 080.71773 37601 (6,035) 080 190 - Mid-Tex Gas Division Retirement 080.71773 37602 (7,554) 080 190 - Mid-Tex Gas Division Retirement 080.71773 38000 (24,213) 080 190 - Mid-Tex Gas Division Retirement 080.71805 37601 (1,378) 080 190 - Mid-Tex Gas Division Retirement 080.71805 37602 (3,561) 080 190 - Mid-Tex Gas Division Retirement 080.71805 38000 (2,793) 080 190 - Mid-Tex Gas Division Retirement 080.71832 37601 (2,961) 080 190 - Mid-Tex Gas Division Retirement 080.71832 37602 (79,872) 080 190 - Mid-Tex Gas Division Retirement 080.71832 38000 (1,082) 080 190 - Mid-Tex Gas Division Retirement 080.71838 37602 20 080 190 - Mid-Tex Gas Division Retirement 080.71839 37601 (94,150) 080 190 - Mid-Tex Gas Division Retirement 080.71839 37602 (217,235) 080 190 - Mid-Tex Gas Division Retirement 080.71839 37800 (84,611) 080 190 - Mid-Tex Gas Division Retirement 080.71839 38000 (5,734) 080 190 - Mid-Tex Gas Division Retirement 080.71850 37601 (27) 080 190 - Mid-Tex Gas Division Retirement 080.71856 37601 (3,106) 080 190 - Mid-Tex Gas Division Retirement 080.71856 37602 (13) 080 190 - Mid-Tex Gas Division Retirement 080.71856 38000 (484) 080 190 - Mid-Tex Gas Division Retirement 080.71884 37601 (937) 080 190 - Mid-Tex Gas Division Retirement 080.71884 37602 (1,450) 080 190 - Mid-Tex Gas Division Retirement 080.71884 37800 (683) 080 190 - Mid-Tex Gas Division Retirement 080.71884 38000 (850) 080 190 - Mid-Tex Gas Division Retirement 080.71892 37601 (974,020) 080 190 - Mid-Tex Gas Division Retirement 080.71894 37601 (19,897) 080 190 - Mid-Tex Gas Division Retirement 080.71894 37602 (15,058) MTX Retirements by FERC Page 4 of 30 550 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.71894 38000 (11,402) 080 190 - Mid-Tex Gas Division Retirement 080.71907 37601 (81,744) 080 190 - Mid-Tex Gas Division Retirement 080.71909 37601 (142,060) 080 190 - Mid-Tex Gas Division Retirement 080.71910 37601 (85,782) 080 190 - Mid-Tex Gas Division Retirement 080.71921 37601 (672) 080 190 - Mid-Tex Gas Division Retirement 080.71921 37602 (1,118) 080 190 - Mid-Tex Gas Division Retirement 080.71921 38000 625 080 190 - Mid-Tex Gas Division Retirement 080.71948 37601 (1,604) 080 190 - Mid-Tex Gas Division Retirement 080.71948 38000 (19,928) 080 190 - Mid-Tex Gas Division Retirement 080.71951 37601 (31) 080 190 - Mid-Tex Gas Division Retirement 080.71954 37602 (593) 080 190 - Mid-Tex Gas Division Retirement 080.71956 37601 (576) 080 190 - Mid-Tex Gas Division Retirement 080.71956 37602 (3,042) 080 190 - Mid-Tex Gas Division Retirement 080.71956 38000 (10,899) 080 190 - Mid-Tex Gas Division Retirement 080.71960 37601 (53) 080 190 - Mid-Tex Gas Division Retirement 080.71962 37601 (506) 080 190 - Mid-Tex Gas Division Retirement 080.71962 37602 796 080 190 - Mid-Tex Gas Division Retirement 080.71962 38000 2,238 080 190 - Mid-Tex Gas Division Retirement 080.71969 37601 (16,573) 080 190 - Mid-Tex Gas Division Retirement 080.71975 37601 31 080 190 - Mid-Tex Gas Division Retirement 080.71982 37602 (13,437) 080 190 - Mid-Tex Gas Division Retirement 080.71993 37601 (384) 080 190 - Mid-Tex Gas Division Retirement 080.71999 37602 (58,544) 080 190 - Mid-Tex Gas Division Retirement 080.71999 38000 (37,446) 080 190 - Mid-Tex Gas Division Retirement 080.72011 37602 343 080 190 - Mid-Tex Gas Division Retirement 080.72011 38000 303 080 190 - Mid-Tex Gas Division Retirement 080.72012 37601 (309) 080 190 - Mid-Tex Gas Division Retirement 080.72035 37601 (37) 080 190 - Mid-Tex Gas Division Retirement 080.72035 38000 (1,146) 080 190 - Mid-Tex Gas Division Retirement 080.72036 37601 (325) 080 190 - Mid-Tex Gas Division Retirement 080.72036 37602 199 080 190 - Mid-Tex Gas Division Retirement 080.72036 38000 (2,909) 080 190 - Mid-Tex Gas Division Retirement 080.72039 37601 7,783 080 190 - Mid-Tex Gas Division Retirement 080.72039 37602 (20,919) 080 190 - Mid-Tex Gas Division Retirement 080.72039 38000 4,445 080 190 - Mid-Tex Gas Division Retirement 080.72045 37601 (708) 080 190 - Mid-Tex Gas Division Retirement 080.72075 37601 (104,142) 080 190 - Mid-Tex Gas Division Retirement 080.72082 37602 (1,259) 080 190 - Mid-Tex Gas Division Retirement 080.72085 37601 (30,820) 080 190 - Mid-Tex Gas Division Retirement 080.72085 37602 (26) 080 190 - Mid-Tex Gas Division Retirement 080.72085 38000 (81,390) 080 190 - Mid-Tex Gas Division Retirement 080.72099 37602 (8,948) 080 190 - Mid-Tex Gas Division Retirement 080.72122 37601 443 080 190 - Mid-Tex Gas Division Retirement 080.72122 37602 4,267 080 190 - Mid-Tex Gas Division Retirement 080.72122 38000 (1,385) 080 190 - Mid-Tex Gas Division Retirement 080.72199 38000 1,524 080 190 - Mid-Tex Gas Division Retirement 080.72203 37602 187 080 190 - Mid-Tex Gas Division Retirement 080.72203 38000 421 080 190 - Mid-Tex Gas Division Retirement 080.72211 38900 (3,038) 080 190 - Mid-Tex Gas Division Retirement 080.72211 39000 (292,508) 080 190 - Mid-Tex Gas Division Retirement 080.72217 37601 (32) 080 190 - Mid-Tex Gas Division Retirement 080.72223 37601 (9,087) 080 190 - Mid-Tex Gas Division Retirement 080.72223 37602 (527) 080 190 - Mid-Tex Gas Division Retirement 080.72239 37602 208 080 190 - Mid-Tex Gas Division Retirement 080.72266 37601 (79,239) 080 190 - Mid-Tex Gas Division Retirement 080.72266 38000 5 080 190 - Mid-Tex Gas Division Retirement 080.72270 37602 (6,536) 080 190 - Mid-Tex Gas Division Retirement 080.72270 38000 (14,006) 080 190 - Mid-Tex Gas Division Retirement 080.72275 37601 (27) 080 190 - Mid-Tex Gas Division Retirement 080.72275 37602 299 080 190 - Mid-Tex Gas Division Retirement 080.72275 38000 2,436 080 190 - Mid-Tex Gas Division Retirement 080.72278 38000 (1,138) 080 190 - Mid-Tex Gas Division Retirement 080.72292 37602 (13) 080 190 - Mid-Tex Gas Division Retirement 080.72292 38000 4,593 080 190 - Mid-Tex Gas Division Retirement 080.72294 37602 6,482 080 190 - Mid-Tex Gas Division Retirement 080.72300 37601 1,168 080 190 - Mid-Tex Gas Division Retirement 080.72300 37602 9 080 190 - Mid-Tex Gas Division Retirement 080.72300 37800 742 080 190 - Mid-Tex Gas Division Retirement 080.72300 38000 6,582 080 190 - Mid-Tex Gas Division Retirement 080.72308 37602 539 080 190 - Mid-Tex Gas Division Retirement 080.72310 38000 (237) 080 190 - Mid-Tex Gas Division Retirement 080.72321 37601 (116) 080 190 - Mid-Tex Gas Division Retirement 080.72321 37602 210 080 190 - Mid-Tex Gas Division Retirement 080.72321 38000 291 080 190 - Mid-Tex Gas Division Retirement 080.72322 37601 (132) 080 190 - Mid-Tex Gas Division Retirement 080.72322 38000 804 080 190 - Mid-Tex Gas Division Retirement 080.72324 37602 (353,997) 080 190 - Mid-Tex Gas Division Retirement 080.72347 37602 (39,039) 080 190 - Mid-Tex Gas Division Retirement 080.72347 38000 (10) 080 190 - Mid-Tex Gas Division Retirement 080.72348 37601 11 080 190 - Mid-Tex Gas Division Retirement 080.72348 37602 (194) 080 190 - Mid-Tex Gas Division Retirement 080.72367 37602 (1,401) 080 190 - Mid-Tex Gas Division Retirement 080.72367 38000 320 080 190 - Mid-Tex Gas Division Retirement 080.72369 37602 23 080 190 - Mid-Tex Gas Division Retirement 080.72369 38000 562 080 190 - Mid-Tex Gas Division Retirement 080.72372 37601 (2,085) 080 190 - Mid-Tex Gas Division Retirement 080.72372 37602 (541) 080 190 - Mid-Tex Gas Division Retirement 080.72372 38000 (24,043) 080 190 - Mid-Tex Gas Division Retirement 080.72389 38000 4,926 080 190 - Mid-Tex Gas Division Retirement 080.72390 37602 (5,677) 080 190 - Mid-Tex Gas Division Retirement 080.72390 38000 (9,412) 080 190 - Mid-Tex Gas Division Retirement 080.72391 37601 (1,967) 080 190 - Mid-Tex Gas Division Retirement 080.72391 37602 (3,490) 080 190 - Mid-Tex Gas Division Retirement 080.72391 38000 (8,772) 080 190 - Mid-Tex Gas Division Retirement 080.72392 37601 (494) 080 190 - Mid-Tex Gas Division Retirement 080.72392 37602 (19) 080 190 - Mid-Tex Gas Division Retirement 080.72392 38000 (313) 080 190 - Mid-Tex Gas Division Retirement 080.72413 37601 (9,716) 080 190 - Mid-Tex Gas Division Retirement 080.72413 37800 (791) 080 190 - Mid-Tex Gas Division Retirement 080.72420 37601 (196) 080 190 - Mid-Tex Gas Division Retirement 080.72420 37602 1,921 080 190 - Mid-Tex Gas Division Retirement 080.72420 38000 (6,032) 080 190 - Mid-Tex Gas Division Retirement 080.72437 38000 255 080 190 - Mid-Tex Gas Division Retirement 080.72438 37602 (6,621) 080 190 - Mid-Tex Gas Division Retirement 080.72438 38000 (26,065) 080 190 - Mid-Tex Gas Division Retirement 080.72439 37601 (2,934) 080 190 - Mid-Tex Gas Division Retirement 080.72439 37602 (4,088) MTX Retirements by FERC Page 5 of 30 551 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.72439 38000 (21,895) 080 190 - Mid-Tex Gas Division Retirement 080.72448 37601 (35) 080 190 - Mid-Tex Gas Division Retirement 080.72448 38000 (332) 080 190 - Mid-Tex Gas Division Retirement 080.72449 37601 15,653 080 190 - Mid-Tex Gas Division Retirement 080.72449 38000 (6,004) 080 190 - Mid-Tex Gas Division Retirement 080.72450 37601 (234) 080 190 - Mid-Tex Gas Division Retirement 080.72450 38000 109 080 190 - Mid-Tex Gas Division Retirement 080.72452 37601 (535) 080 190 - Mid-Tex Gas Division Retirement 080.72452 37602 (1,162) 080 190 - Mid-Tex Gas Division Retirement 080.72452 38000 (2,998) 080 190 - Mid-Tex Gas Division Retirement 080.72461 38000 490 080 190 - Mid-Tex Gas Division Retirement 080.72473 37601 (6,188) 080 190 - Mid-Tex Gas Division Retirement 080.72473 37602 (276) 080 190 - Mid-Tex Gas Division Retirement 080.72473 37800 (5,835) 080 190 - Mid-Tex Gas Division Retirement 080.72490 38000 1,515 080 190 - Mid-Tex Gas Division Retirement 080.72497 38000 676 080 190 - Mid-Tex Gas Division Retirement 080.72500 37601 (5,377) 080 190 - Mid-Tex Gas Division Retirement 080.72500 37602 (128,217) 080 190 - Mid-Tex Gas Division Retirement 080.72505 38000 6,209 080 190 - Mid-Tex Gas Division Retirement 080.72508 37601 (190) 080 190 - Mid-Tex Gas Division Retirement 080.72512 37601 157 080 190 - Mid-Tex Gas Division Retirement 080.72512 37602 94 080 190 - Mid-Tex Gas Division Retirement 080.72512 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.72524 37602 (1,389) 080 190 - Mid-Tex Gas Division Retirement 080.72525 37601 (1,761) 080 190 - Mid-Tex Gas Division Retirement 080.72525 37602 (1,916) 080 190 - Mid-Tex Gas Division Retirement 080.72525 38000 (14,770) 080 190 - Mid-Tex Gas Division Retirement 080.72526 37601 (15,165) 080 190 - Mid-Tex Gas Division Retirement 080.72526 37602 1,114 080 190 - Mid-Tex Gas Division Retirement 080.72526 38000 (19,588) 080 190 - Mid-Tex Gas Division Retirement 080.72527 37601 (187,453) 080 190 - Mid-Tex Gas Division Retirement 080.72527 38000 (8,323) 080 190 - Mid-Tex Gas Division Retirement 080.72528 37601 (403,790) 080 190 - Mid-Tex Gas Division Retirement 080.72528 38000 (6,854) 080 190 - Mid-Tex Gas Division Retirement 080.72529 37601 (33,460) 080 190 - Mid-Tex Gas Division Retirement 080.72529 38000 (26,781) 080 190 - Mid-Tex Gas Division Retirement 080.72533 37601 (288) 080 190 - Mid-Tex Gas Division Retirement 080.72533 37602 (1,745) 080 190 - Mid-Tex Gas Division Retirement 080.72533 38000 (624) 080 190 - Mid-Tex Gas Division Retirement 080.72535 37601 (1,427) 080 190 - Mid-Tex Gas Division Retirement 080.72535 37602 (198) 080 190 - Mid-Tex Gas Division Retirement 080.72535 38000 (3,373) 080 190 - Mid-Tex Gas Division Retirement 080.72536 37601 (1,309) 080 190 - Mid-Tex Gas Division Retirement 080.72536 37602 (631) 080 190 - Mid-Tex Gas Division Retirement 080.72536 38000 (15,748) 080 190 - Mid-Tex Gas Division Retirement 080.72545 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.72550 37601 (576) 080 190 - Mid-Tex Gas Division Retirement 080.72559 37602 (2,277) 080 190 - Mid-Tex Gas Division Retirement 080.72607 37601 4 080 190 - Mid-Tex Gas Division Retirement 080.72607 37602 330 080 190 - Mid-Tex Gas Division Retirement 080.72617 37601 (18,298) 080 190 - Mid-Tex Gas Division Retirement 080.72617 37602 (796) 080 190 - Mid-Tex Gas Division Retirement 080.72617 38000 (16,933) 080 190 - Mid-Tex Gas Division Retirement 080.72618 37601 (17) 080 190 - Mid-Tex Gas Division Retirement 080.72618 37602 35 080 190 - Mid-Tex Gas Division Retirement 080.72623 37602 (449) 080 190 - Mid-Tex Gas Division Retirement 080.72649 37601 (2,801) 080 190 - Mid-Tex Gas Division Retirement 080.72649 37602 (1,994) 080 190 - Mid-Tex Gas Division Retirement 080.72649 38000 (2,840) 080 190 - Mid-Tex Gas Division Retirement 080.72651 37601 (3,357) 080 190 - Mid-Tex Gas Division Retirement 080.72651 37602 (766) 080 190 - Mid-Tex Gas Division Retirement 080.72653 37602 (2,068) 080 190 - Mid-Tex Gas Division Retirement 080.72656 37601 (4,002) 080 190 - Mid-Tex Gas Division Retirement 080.72656 38000 (3,747) 080 190 - Mid-Tex Gas Division Retirement 080.72658 37602 (27,325) 080 190 - Mid-Tex Gas Division Retirement 080.72663 37602 (77) 080 190 - Mid-Tex Gas Division Retirement 080.72678 37601 (16) 080 190 - Mid-Tex Gas Division Retirement 080.72678 38000 637 080 190 - Mid-Tex Gas Division Retirement 080.72696 37601 (17,029) 080 190 - Mid-Tex Gas Division Retirement 080.72696 37602 (115,853) 080 190 - Mid-Tex Gas Division Retirement 080.72696 38000 (19,577) 080 190 - Mid-Tex Gas Division Retirement 080.72700 37601 (13,744) 080 190 - Mid-Tex Gas Division Retirement 080.72700 37800 (395,139) 080 190 - Mid-Tex Gas Division Retirement 080.72726 37601 (379) 080 190 - Mid-Tex Gas Division Retirement 080.72726 37602 (22,610) 080 190 - Mid-Tex Gas Division Retirement 080.72726 38000 (7,538) 080 190 - Mid-Tex Gas Division Retirement 080.72742 37601 (142) 080 190 - Mid-Tex Gas Division Retirement 080.72742 37602 (1,349) 080 190 - Mid-Tex Gas Division Retirement 080.72742 38000 (1,424) 080 190 - Mid-Tex Gas Division Retirement 080.72743 38000 2,945 080 190 - Mid-Tex Gas Division Retirement 080.72751 37601 (117,642) 080 190 - Mid-Tex Gas Division Retirement 080.72751 37800 (3,020) 080 190 - Mid-Tex Gas Division Retirement 080.72759 37601 (24,375) 080 190 - Mid-Tex Gas Division Retirement 080.72760 37601 (424) 080 190 - Mid-Tex Gas Division Retirement 080.72760 37602 (9,774) 080 190 - Mid-Tex Gas Division Retirement 080.72760 37800 (10,522) 080 190 - Mid-Tex Gas Division Retirement 080.72760 38000 (13,271) 080 190 - Mid-Tex Gas Division Retirement 080.72762 37601 (29,065) 080 190 - Mid-Tex Gas Division Retirement 080.72762 37602 12,084 080 190 - Mid-Tex Gas Division Retirement 080.72762 38000 (2,939) 080 190 - Mid-Tex Gas Division Retirement 080.72763 37601 (2,008) 080 190 - Mid-Tex Gas Division Retirement 080.72763 37602 (24,649) 080 190 - Mid-Tex Gas Division Retirement 080.72763 37800 (7,147) 080 190 - Mid-Tex Gas Division Retirement 080.72763 38000 (12,394) 080 190 - Mid-Tex Gas Division Retirement 080.72764 37601 (158,864) 080 190 - Mid-Tex Gas Division Retirement 080.72764 37800 (35,445) 080 190 - Mid-Tex Gas Division Retirement 080.72764 38000 (51) 080 190 - Mid-Tex Gas Division Retirement 080.72765 38000 10 080 190 - Mid-Tex Gas Division Retirement 080.72767 37601 (931) 080 190 - Mid-Tex Gas Division Retirement 080.72767 37800 (73,740) 080 190 - Mid-Tex Gas Division Retirement 080.72767 38000 (1,326) 080 190 - Mid-Tex Gas Division Retirement 080.72780 37601 (1,672) 080 190 - Mid-Tex Gas Division Retirement 080.72780 37602 (15,690) 080 190 - Mid-Tex Gas Division Retirement 080.72780 37800 (1,921) 080 190 - Mid-Tex Gas Division Retirement 080.72780 38000 453 080 190 - Mid-Tex Gas Division Retirement 080.72785 37601 (2,502) 080 190 - Mid-Tex Gas Division Retirement 080.72785 37602 289 MTX Retirements by FERC Page 6 of 30 552 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.72785 38000 (243) 080 190 - Mid-Tex Gas Division Retirement 080.72789 37602 (783) 080 190 - Mid-Tex Gas Division Retirement 080.72819 37602 (2,553) 080 190 - Mid-Tex Gas Division Retirement 080.72825 38000 956 080 190 - Mid-Tex Gas Division Retirement 080.72837 37601 6 080 190 - Mid-Tex Gas Division Retirement 080.72837 37602 393 080 190 - Mid-Tex Gas Division Retirement 080.72837 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.72840 37601 (6,886) 080 190 - Mid-Tex Gas Division Retirement 080.72840 37602 (24,008) 080 190 - Mid-Tex Gas Division Retirement 080.72840 38000 (21,510) 080 190 - Mid-Tex Gas Division Retirement 080.72841 37602 (159) 080 190 - Mid-Tex Gas Division Retirement 080.72855 37602 (2,340) 080 190 - Mid-Tex Gas Division Retirement 080.72857 37602 (13,800) 080 190 - Mid-Tex Gas Division Retirement 080.72869 37601 (620) 080 190 - Mid-Tex Gas Division Retirement 080.72869 37602 339 080 190 - Mid-Tex Gas Division Retirement 080.72869 37800 (4,327) 080 190 - Mid-Tex Gas Division Retirement 080.72869 38000 (4) 080 190 - Mid-Tex Gas Division Retirement 080.72891 37601 (26) 080 190 - Mid-Tex Gas Division Retirement 080.72906 37602 (39,538) 080 190 - Mid-Tex Gas Division Retirement 080.72906 38000 (4,294) 080 190 - Mid-Tex Gas Division Retirement 080.72930 37601 (123,779) 080 190 - Mid-Tex Gas Division Retirement 080.72930 37602 (4,458) 080 190 - Mid-Tex Gas Division Retirement 080.72935 37601 931 080 190 - Mid-Tex Gas Division Retirement 080.72935 37602 (2,388) 080 190 - Mid-Tex Gas Division Retirement 080.72935 38000 2,094 080 190 - Mid-Tex Gas Division Retirement 080.72949 37601 (24) 080 190 - Mid-Tex Gas Division Retirement 080.72954 37601 (1,953) 080 190 - Mid-Tex Gas Division Retirement 080.72954 38000 (1,139) 080 190 - Mid-Tex Gas Division Retirement 080.72959 37601 212 080 190 - Mid-Tex Gas Division Retirement 080.72959 38000 (2,226) 080 190 - Mid-Tex Gas Division Retirement 080.72970 37601 (2,776) 080 190 - Mid-Tex Gas Division Retirement 080.72970 38000 (4,270) 080 190 - Mid-Tex Gas Division Retirement 080.72973 37601 277 080 190 - Mid-Tex Gas Division Retirement 080.72973 38000 (22,771) 080 190 - Mid-Tex Gas Division Retirement 080.72975 37601 (5,351) 080 190 - Mid-Tex Gas Division Retirement 080.72975 38000 (1,883) 080 190 - Mid-Tex Gas Division Retirement 080.72978 37601 79 080 190 - Mid-Tex Gas Division Retirement 080.72983 37602 4,292 080 190 - Mid-Tex Gas Division Retirement 080.72983 38000 5,094 080 190 - Mid-Tex Gas Division Retirement 080.72987 37601 (1,234) 080 190 - Mid-Tex Gas Division Retirement 080.72987 37602 (1,149) 080 190 - Mid-Tex Gas Division Retirement 080.72987 38000 (4,468) 080 190 - Mid-Tex Gas Division Retirement 080.72988 37601 (797) 080 190 - Mid-Tex Gas Division Retirement 080.72988 37602 (6,956) 080 190 - Mid-Tex Gas Division Retirement 080.72988 38000 (10,946) 080 190 - Mid-Tex Gas Division Retirement 080.72990 37601 (893) 080 190 - Mid-Tex Gas Division Retirement 080.72990 38000 (2,540) 080 190 - Mid-Tex Gas Division Retirement 080.72991 37601 (2,280) 080 190 - Mid-Tex Gas Division Retirement 080.72991 37602 (413) 080 190 - Mid-Tex Gas Division Retirement 080.72991 38000 (24,202) 080 190 - Mid-Tex Gas Division Retirement 080.73007 38000 22 080 190 - Mid-Tex Gas Division Retirement 080.73024 37601 (4,456) 080 190 - Mid-Tex Gas Division Retirement 080.73024 38000 45 080 190 - Mid-Tex Gas Division Retirement 080.73025 38000 1,137 080 190 - Mid-Tex Gas Division Retirement 080.73026 37601 1,292 080 190 - Mid-Tex Gas Division Retirement 080.73026 37602 366 080 190 - Mid-Tex Gas Division Retirement 080.73026 38000 2,908 080 190 - Mid-Tex Gas Division Retirement 080.73027 38000 5,981 080 190 - Mid-Tex Gas Division Retirement 080.73028 37601 181 080 190 - Mid-Tex Gas Division Retirement 080.73028 38000 1,380 080 190 - Mid-Tex Gas Division Retirement 080.73029 38000 (7,860) 080 190 - Mid-Tex Gas Division Retirement 080.73031 37601 (1,726) 080 190 - Mid-Tex Gas Division Retirement 080.73031 37602 432 080 190 - Mid-Tex Gas Division Retirement 080.73031 38000 (14,695) 080 190 - Mid-Tex Gas Division Retirement 080.73032 38000 351 080 190 - Mid-Tex Gas Division Retirement 080.73033 38000 (379) 080 190 - Mid-Tex Gas Division Retirement 080.73053 37601 (408) 080 190 - Mid-Tex Gas Division Retirement 080.73053 37602 (5,012) 080 190 - Mid-Tex Gas Division Retirement 080.73053 38000 55,199 080 190 - Mid-Tex Gas Division Retirement 080.73068 38000 (3,525) 080 190 - Mid-Tex Gas Division Retirement 080.73083 37602 (465) 080 190 - Mid-Tex Gas Division Retirement 080.73083 38000 (20) 080 190 - Mid-Tex Gas Division Retirement 080.73089 37601 (57) 080 190 - Mid-Tex Gas Division Retirement 080.73089 37800 (1,087) 080 190 - Mid-Tex Gas Division Retirement 080.73094 38000 (46) 080 190 - Mid-Tex Gas Division Retirement 080.73107 38000 (61) 080 190 - Mid-Tex Gas Division Retirement 080.73111 38000 769 080 190 - Mid-Tex Gas Division Retirement 080.73137 37601 244 080 190 - Mid-Tex Gas Division Retirement 080.73137 38000 2,185 080 190 - Mid-Tex Gas Division Retirement 080.73147 37601 (85) 080 190 - Mid-Tex Gas Division Retirement 080.73147 38000 (104) 080 190 - Mid-Tex Gas Division Retirement 080.73159 37602 (1,357) 080 190 - Mid-Tex Gas Division Retirement 080.73159 38000 (459) 080 190 - Mid-Tex Gas Division Retirement 080.73163 38000 (2,635) 080 190 - Mid-Tex Gas Division Retirement 080.73164 37601 (2,259) 080 190 - Mid-Tex Gas Division Retirement 080.73164 38000 (9,510) 080 190 - Mid-Tex Gas Division Retirement 080.73169 37601 (7,119) 080 190 - Mid-Tex Gas Division Retirement 080.73169 37602 (644) 080 190 - Mid-Tex Gas Division Retirement 080.73169 38000 (3,652) 080 190 - Mid-Tex Gas Division Retirement 080.73174 38000 558 080 190 - Mid-Tex Gas Division Retirement 080.73182 37601 (11,474) 080 190 - Mid-Tex Gas Division Retirement 080.73182 37602 (5,183) 080 190 - Mid-Tex Gas Division Retirement 080.73182 38000 (27,172) 080 190 - Mid-Tex Gas Division Retirement 080.73194 38000 1,099 080 190 - Mid-Tex Gas Division Retirement 080.73221 38000 1,638 080 190 - Mid-Tex Gas Division Retirement 080.73224 37601 17 080 190 - Mid-Tex Gas Division Retirement 080.73224 38000 (473) 080 190 - Mid-Tex Gas Division Retirement 080.73226 38000 4,742 080 190 - Mid-Tex Gas Division Retirement 080.73228 37601 5,669 080 190 - Mid-Tex Gas Division Retirement 080.73228 37602 (55) 080 190 - Mid-Tex Gas Division Retirement 080.73228 38000 (1,653) 080 190 - Mid-Tex Gas Division Retirement 080.73230 37602 1,303 080 190 - Mid-Tex Gas Division Retirement 080.73238 37601 82,429 080 190 - Mid-Tex Gas Division Retirement 080.73273 37601 (7,231) 080 190 - Mid-Tex Gas Division Retirement 080.73273 37602 (33) 080 190 - Mid-Tex Gas Division Retirement 080.73273 38000 (4,134) 080 190 - Mid-Tex Gas Division Retirement 080.73283 37601 6 MTX Retirements by FERC Page 7 of 30 553 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.73283 38000 (98) 080 190 - Mid-Tex Gas Division Retirement 080.73288 37601 (2,517) 080 190 - Mid-Tex Gas Division Retirement 080.73288 37602 422 080 190 - Mid-Tex Gas Division Retirement 080.73288 38000 716 080 190 - Mid-Tex Gas Division Retirement 080.73297 37602 (877) 080 190 - Mid-Tex Gas Division Retirement 080.73300 37601 1,441 080 190 - Mid-Tex Gas Division Retirement 080.73300 37602 411 080 190 - Mid-Tex Gas Division Retirement 080.73300 38000 (2,626) 080 190 - Mid-Tex Gas Division Retirement 080.73308 38000 177 080 190 - Mid-Tex Gas Division Retirement 080.73315 37601 (4,539) 080 190 - Mid-Tex Gas Division Retirement 080.73315 37602 (2,294) 080 190 - Mid-Tex Gas Division Retirement 080.73322 37601 (148,105) 080 190 - Mid-Tex Gas Division Retirement 080.73322 37602 (3,413) 080 190 - Mid-Tex Gas Division Retirement 080.73322 38000 (2,135) 080 190 - Mid-Tex Gas Division Retirement 080.73327 37601 17 080 190 - Mid-Tex Gas Division Retirement 080.73327 37602 46 080 190 - Mid-Tex Gas Division Retirement 080.73327 38000 625 080 190 - Mid-Tex Gas Division Retirement 080.73329 37601 (2,089) 080 190 - Mid-Tex Gas Division Retirement 080.73329 37602 (8,598) 080 190 - Mid-Tex Gas Division Retirement 080.73329 38000 (111) 080 190 - Mid-Tex Gas Division Retirement 080.73342 37601 (677) 080 190 - Mid-Tex Gas Division Retirement 080.73342 37602 (313) 080 190 - Mid-Tex Gas Division Retirement 080.73342 37800 (218,234) 080 190 - Mid-Tex Gas Division Retirement 080.73352 37601 (250,920) 080 190 - Mid-Tex Gas Division Retirement 080.73358 37601 (4,535) 080 190 - Mid-Tex Gas Division Retirement 080.73358 38000 6,327 080 190 - Mid-Tex Gas Division Retirement 080.73371 37602 3,355 080 190 - Mid-Tex Gas Division Retirement 080.73371 38000 (914) 080 190 - Mid-Tex Gas Division Retirement 080.73387 37602 1,451 080 190 - Mid-Tex Gas Division Retirement 080.73388 37601 113 080 190 - Mid-Tex Gas Division Retirement 080.73388 37602 (275) 080 190 - Mid-Tex Gas Division Retirement 080.73390 37602 (22,455) 080 190 - Mid-Tex Gas Division Retirement 080.73406 38000 761 080 190 - Mid-Tex Gas Division Retirement 080.73410 37601 158 080 190 - Mid-Tex Gas Division Retirement 080.73410 38000 (2,300) 080 190 - Mid-Tex Gas Division Retirement 080.73411 37601 (3,446) 080 190 - Mid-Tex Gas Division Retirement 080.73411 37602 (1,728) 080 190 - Mid-Tex Gas Division Retirement 080.73411 38000 (5,568) 080 190 - Mid-Tex Gas Division Retirement 080.73413 38000 (4,410) 080 190 - Mid-Tex Gas Division Retirement 080.73430 37602 (325) 080 190 - Mid-Tex Gas Division Retirement 080.73442 38000 (9,851) 080 190 - Mid-Tex Gas Division Retirement 080.73450 37601 (906) 080 190 - Mid-Tex Gas Division Retirement 080.73450 38000 (3,273) 080 190 - Mid-Tex Gas Division Retirement 080.73452 37601 (988) 080 190 - Mid-Tex Gas Division Retirement 080.73452 38000 (1,981) 080 190 - Mid-Tex Gas Division Retirement 080.73453 38000 (9,350) 080 190 - Mid-Tex Gas Division Retirement 080.73454 37601 (368) 080 190 - Mid-Tex Gas Division Retirement 080.73454 37602 (1,008) 080 190 - Mid-Tex Gas Division Retirement 080.73454 38000 (14,542) 080 190 - Mid-Tex Gas Division Retirement 080.73455 37601 (2,085) 080 190 - Mid-Tex Gas Division Retirement 080.73455 37602 (3,612) 080 190 - Mid-Tex Gas Division Retirement 080.73455 38000 (14,400) 080 190 - Mid-Tex Gas Division Retirement 080.73457 37601 (2,854) 080 190 - Mid-Tex Gas Division Retirement 080.73457 37602 (8,713) 080 190 - Mid-Tex Gas Division Retirement 080.73457 38000 (4,127) 080 190 - Mid-Tex Gas Division Retirement 080.73460 37601 (1,058) 080 190 - Mid-Tex Gas Division Retirement 080.73460 38000 (1,977) 080 190 - Mid-Tex Gas Division Retirement 080.73462 37601 (898) 080 190 - Mid-Tex Gas Division Retirement 080.73462 38000 (6,665) 080 190 - Mid-Tex Gas Division Retirement 080.73468 38000 2,945 080 190 - Mid-Tex Gas Division Retirement 080.73479 38000 4 080 190 - Mid-Tex Gas Division Retirement 080.73493 37602 (52) 080 190 - Mid-Tex Gas Division Retirement 080.73493 37800 (60,100) 080 190 - Mid-Tex Gas Division Retirement 080.73497 37602 (17,665) 080 190 - Mid-Tex Gas Division Retirement 080.73497 38000 (98,261) 080 190 - Mid-Tex Gas Division Retirement 080.73514 37601 (114,931) 080 190 - Mid-Tex Gas Division Retirement 080.73514 37602 (39,737) 080 190 - Mid-Tex Gas Division Retirement 080.73514 38000 (19,760) 080 190 - Mid-Tex Gas Division Retirement 080.73517 37601 (22,355) 080 190 - Mid-Tex Gas Division Retirement 080.73517 37602 (9,610) 080 190 - Mid-Tex Gas Division Retirement 080.73517 38000 (15,525) 080 190 - Mid-Tex Gas Division Retirement 080.73523 38000 1 080 190 - Mid-Tex Gas Division Retirement 080.73531 38000 (4,237) 080 190 - Mid-Tex Gas Division Retirement 080.73546 37602 3 080 190 - Mid-Tex Gas Division Retirement 080.73557 38000 (2,032) 080 190 - Mid-Tex Gas Division Retirement 080.73558 37601 331 080 190 - Mid-Tex Gas Division Retirement 080.73558 38000 (18,070) 080 190 - Mid-Tex Gas Division Retirement 080.73574 37601 (17) 080 190 - Mid-Tex Gas Division Retirement 080.73574 38000 17 080 190 - Mid-Tex Gas Division Retirement 080.73575 37602 (3,852) 080 190 - Mid-Tex Gas Division Retirement 080.73575 38000 (48,881) 080 190 - Mid-Tex Gas Division Retirement 080.73576 37602 (180) 080 190 - Mid-Tex Gas Division Retirement 080.73579 37601 (23,161) 080 190 - Mid-Tex Gas Division Retirement 080.73579 37602 (6,478) 080 190 - Mid-Tex Gas Division Retirement 080.73579 38000 (2,155) 080 190 - Mid-Tex Gas Division Retirement 080.73586 37601 7 080 190 - Mid-Tex Gas Division Retirement 080.73586 38000 447 080 190 - Mid-Tex Gas Division Retirement 080.73587 37601 (272) 080 190 - Mid-Tex Gas Division Retirement 080.73587 37602 (2,725) 080 190 - Mid-Tex Gas Division Retirement 080.73587 38000 (1,418) 080 190 - Mid-Tex Gas Division Retirement 080.73592 37601 (513) 080 190 - Mid-Tex Gas Division Retirement 080.73592 37602 (1,884) 080 190 - Mid-Tex Gas Division Retirement 080.73592 38000 (11,359) 080 190 - Mid-Tex Gas Division Retirement 080.73593 37601 (396) 080 190 - Mid-Tex Gas Division Retirement 080.73593 37602 43 080 190 - Mid-Tex Gas Division Retirement 080.73593 38000 (9,874) 080 190 - Mid-Tex Gas Division Retirement 080.73601 37602 225 080 190 - Mid-Tex Gas Division Retirement 080.73601 38000 2,668 080 190 - Mid-Tex Gas Division Retirement 080.73614 38000 (14,827) 080 190 - Mid-Tex Gas Division Retirement 080.73616 38000 (3,191) 080 190 - Mid-Tex Gas Division Retirement 080.73618 37601 (21) 080 190 - Mid-Tex Gas Division Retirement 080.73626 37601 706 080 190 - Mid-Tex Gas Division Retirement 080.73626 37602 (601) 080 190 - Mid-Tex Gas Division Retirement 080.73626 38000 4,129 080 190 - Mid-Tex Gas Division Retirement 080.73641 37602 21 080 190 - Mid-Tex Gas Division Retirement 080.73641 38000 69 080 190 - Mid-Tex Gas Division Retirement 080.73655 37601 (4,035) MTX Retirements by FERC Page 8 of 30 554 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.73655 37602 (16) 080 190 - Mid-Tex Gas Division Retirement 080.73655 38000 (15,552) 080 190 - Mid-Tex Gas Division Retirement 080.73657 37601 (236) 080 190 - Mid-Tex Gas Division Retirement 080.73657 37602 (10) 080 190 - Mid-Tex Gas Division Retirement 080.73657 38000 (109) 080 190 - Mid-Tex Gas Division Retirement 080.73671 37601 (1,857) 080 190 - Mid-Tex Gas Division Retirement 080.73671 37602 (719) 080 190 - Mid-Tex Gas Division Retirement 080.73671 38000 (17,348) 080 190 - Mid-Tex Gas Division Retirement 080.73672 37601 (2,616) 080 190 - Mid-Tex Gas Division Retirement 080.73672 37602 (338) 080 190 - Mid-Tex Gas Division Retirement 080.73672 38000 (2,121) 080 190 - Mid-Tex Gas Division Retirement 080.73678 37601 (18,058) 080 190 - Mid-Tex Gas Division Retirement 080.73678 38000 (20) 080 190 - Mid-Tex Gas Division Retirement 080.73695 37602 10,927 080 190 - Mid-Tex Gas Division Retirement 080.73695 38000 (423) 080 190 - Mid-Tex Gas Division Retirement 080.73701 37602 (5,436) 080 190 - Mid-Tex Gas Division Retirement 080.73701 38000 (16,081) 080 190 - Mid-Tex Gas Division Retirement 080.73703 37601 (8) 080 190 - Mid-Tex Gas Division Retirement 080.73703 37602 (134) 080 190 - Mid-Tex Gas Division Retirement 080.73703 38000 (1,456) 080 190 - Mid-Tex Gas Division Retirement 080.73720 37602 (612) 080 190 - Mid-Tex Gas Division Retirement 080.73729 37601 10,699 080 190 - Mid-Tex Gas Division Retirement 080.73729 38000 856 080 190 - Mid-Tex Gas Division Retirement 080.73730 38000 428 080 190 - Mid-Tex Gas Division Retirement 080.73732 37601 31 080 190 - Mid-Tex Gas Division Retirement 080.73741 37601 (20) 080 190 - Mid-Tex Gas Division Retirement 080.73741 38000 (2,988) 080 190 - Mid-Tex Gas Division Retirement 080.73745 37601 (4,710) 080 190 - Mid-Tex Gas Division Retirement 080.73745 37602 (897) 080 190 - Mid-Tex Gas Division Retirement 080.73745 38000 (8,088) 080 190 - Mid-Tex Gas Division Retirement 080.73753 37601 (280,527) 080 190 - Mid-Tex Gas Division Retirement 080.73753 37602 (24) 080 190 - Mid-Tex Gas Division Retirement 080.73753 38000 (37,453) 080 190 - Mid-Tex Gas Division Retirement 080.73755 37601 (41,036) 080 190 - Mid-Tex Gas Division Retirement 080.73755 38000 (2,298) 080 190 - Mid-Tex Gas Division Retirement 080.73761 37602 (17,651) 080 190 - Mid-Tex Gas Division Retirement 080.73761 38000 (10) 080 190 - Mid-Tex Gas Division Retirement 080.73773 37602 242 080 190 - Mid-Tex Gas Division Retirement 080.73773 38000 87,150 080 190 - Mid-Tex Gas Division Retirement 080.73784 38000 (493) 080 190 - Mid-Tex Gas Division Retirement 080.73787 38000 252 080 190 - Mid-Tex Gas Division Retirement 080.73793 37601 (1,986) 080 190 - Mid-Tex Gas Division Retirement 080.73793 37602 (3,183) 080 190 - Mid-Tex Gas Division Retirement 080.73793 38000 (588) 080 190 - Mid-Tex Gas Division Retirement 080.73807 37601 (13) 080 190 - Mid-Tex Gas Division Retirement 080.73807 37800 (10,660) 080 190 - Mid-Tex Gas Division Retirement 080.73810 37601 (222) 080 190 - Mid-Tex Gas Division Retirement 080.73810 38000 (1,669) 080 190 - Mid-Tex Gas Division Retirement 080.73814 37601 34 080 190 - Mid-Tex Gas Division Retirement 080.73814 38000 153 080 190 - Mid-Tex Gas Division Retirement 080.73837 37601 198 080 190 - Mid-Tex Gas Division Retirement 080.73837 38000 (2,889) 080 190 - Mid-Tex Gas Division Retirement 080.73839 37601 (101,062) 080 190 - Mid-Tex Gas Division Retirement 080.73839 37602 (354) 080 190 - Mid-Tex Gas Division Retirement 080.73839 38000 (12,911) 080 190 - Mid-Tex Gas Division Retirement 080.73840 37601 (684) 080 190 - Mid-Tex Gas Division Retirement 080.73840 37602 (8,067) 080 190 - Mid-Tex Gas Division Retirement 080.73840 38000 (13,829) 080 190 - Mid-Tex Gas Division Retirement 080.73841 37601 (117,856) 080 190 - Mid-Tex Gas Division Retirement 080.73841 38000 (23,487) 080 190 - Mid-Tex Gas Division Retirement 080.73842 37601 (369) 080 190 - Mid-Tex Gas Division Retirement 080.73842 37602 (4,137) 080 190 - Mid-Tex Gas Division Retirement 080.73842 38000 (3,964) 080 190 - Mid-Tex Gas Division Retirement 080.73845 37602 (2,905) 080 190 - Mid-Tex Gas Division Retirement 080.73845 38000 (7,461) 080 190 - Mid-Tex Gas Division Retirement 080.73846 37601 (14,997) 080 190 - Mid-Tex Gas Division Retirement 080.73846 38000 (22,836) 080 190 - Mid-Tex Gas Division Retirement 080.73847 37601 (5,809) 080 190 - Mid-Tex Gas Division Retirement 080.73847 38000 (11,021) 080 190 - Mid-Tex Gas Division Retirement 080.73848 37601 (8,099) 080 190 - Mid-Tex Gas Division Retirement 080.73848 38000 (10,458) 080 190 - Mid-Tex Gas Division Retirement 080.73849 37601 (6,194) 080 190 - Mid-Tex Gas Division Retirement 080.73849 38000 (11,663) 080 190 - Mid-Tex Gas Division Retirement 080.73853 38000 (3,762) 080 190 - Mid-Tex Gas Division Retirement 080.73859 37601 (2,861) 080 190 - Mid-Tex Gas Division Retirement 080.73859 38000 (981) 080 190 - Mid-Tex Gas Division Retirement 080.73865 37601 (5,785) 080 190 - Mid-Tex Gas Division Retirement 080.73865 37602 (10,628) 080 190 - Mid-Tex Gas Division Retirement 080.73865 38000 (20,747) 080 190 - Mid-Tex Gas Division Retirement 080.73872 37601 (4,627) 080 190 - Mid-Tex Gas Division Retirement 080.73872 37800 (4,779) 080 190 - Mid-Tex Gas Division Retirement 080.73876 37601 (8,267) 080 190 - Mid-Tex Gas Division Retirement 080.73883 37601 (3,052) 080 190 - Mid-Tex Gas Division Retirement 080.73883 38000 (1,935) 080 190 - Mid-Tex Gas Division Retirement 080.73885 37601 (1,217) 080 190 - Mid-Tex Gas Division Retirement 080.73885 38000 (11,983) 080 190 - Mid-Tex Gas Division Retirement 080.73890 37601 156 080 190 - Mid-Tex Gas Division Retirement 080.73890 37602 747 080 190 - Mid-Tex Gas Division Retirement 080.73890 38000 (432) 080 190 - Mid-Tex Gas Division Retirement 080.73892 37601 (10,904) 080 190 - Mid-Tex Gas Division Retirement 080.73892 38000 (1,331) 080 190 - Mid-Tex Gas Division Retirement 080.73895 37601 (2,744) 080 190 - Mid-Tex Gas Division Retirement 080.73895 37602 (15,918) 080 190 - Mid-Tex Gas Division Retirement 080.73895 38000 (18,652) 080 190 - Mid-Tex Gas Division Retirement 080.73896 37601 (1,120) 080 190 - Mid-Tex Gas Division Retirement 080.73896 38000 (8,551) 080 190 - Mid-Tex Gas Division Retirement 080.73897 37602 (12,265) 080 190 - Mid-Tex Gas Division Retirement 080.73903 37601 (3,183) 080 190 - Mid-Tex Gas Division Retirement 080.73903 38000 (4,061) 080 190 - Mid-Tex Gas Division Retirement 080.73908 37601 562 080 190 - Mid-Tex Gas Division Retirement 080.73908 37602 (77) 080 190 - Mid-Tex Gas Division Retirement 080.73908 38000 (9,631) 080 190 - Mid-Tex Gas Division Retirement 080.73914 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.73938 38000 (511) 080 190 - Mid-Tex Gas Division Retirement 080.73941 37601 (65) 080 190 - Mid-Tex Gas Division Retirement 080.73941 38000 (14,855) 080 190 - Mid-Tex Gas Division Retirement 080.73952 37601 651 MTX Retirements by FERC Page 9 of 30 555 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.73952 38000 88 080 190 - Mid-Tex Gas Division Retirement 080.73959 37601 539 080 190 - Mid-Tex Gas Division Retirement 080.73959 38000 (215) 080 190 - Mid-Tex Gas Division Retirement 080.73965 37601 (41,851) 080 190 - Mid-Tex Gas Division Retirement 080.73965 38000 (20,190) 080 190 - Mid-Tex Gas Division Retirement 080.73972 37601 (1,875) 080 190 - Mid-Tex Gas Division Retirement 080.73972 38000 (1,887) 080 190 - Mid-Tex Gas Division Retirement 080.73979 37602 (1,474) 080 190 - Mid-Tex Gas Division Retirement 080.73983 37601 (3,082) 080 190 - Mid-Tex Gas Division Retirement 080.73983 37602 (998) 080 190 - Mid-Tex Gas Division Retirement 080.73983 38000 (3,442) 080 190 - Mid-Tex Gas Division Retirement 080.73988 37601 (2,526) 080 190 - Mid-Tex Gas Division Retirement 080.73988 38000 (12,057) 080 190 - Mid-Tex Gas Division Retirement 080.73994 37601 (526,309) 080 190 - Mid-Tex Gas Division Retirement 080.73994 37602 (72) 080 190 - Mid-Tex Gas Division Retirement 080.73994 38000 (9,829) 080 190 - Mid-Tex Gas Division Retirement 080.74000 37601 (1,666) 080 190 - Mid-Tex Gas Division Retirement 080.74000 37602 (1,674) 080 190 - Mid-Tex Gas Division Retirement 080.74000 37800 (154,582) 080 190 - Mid-Tex Gas Division Retirement 080.74000 38000 (5,978) 080 190 - Mid-Tex Gas Division Retirement 080.74002 37601 (379) 080 190 - Mid-Tex Gas Division Retirement 080.74002 37602 (2,899) 080 190 - Mid-Tex Gas Division Retirement 080.74002 37800 (40,978) 080 190 - Mid-Tex Gas Division Retirement 080.74002 38000 (841) 080 190 - Mid-Tex Gas Division Retirement 080.74003 37601 (68,755) 080 190 - Mid-Tex Gas Division Retirement 080.74003 37602 (1,520) 080 190 - Mid-Tex Gas Division Retirement 080.74003 37800 (5,926) 080 190 - Mid-Tex Gas Division Retirement 080.74003 38000 (6,961) 080 190 - Mid-Tex Gas Division Retirement 080.74005 38000 31 080 190 - Mid-Tex Gas Division Retirement 080.74009 37601 (10,213) 080 190 - Mid-Tex Gas Division Retirement 080.74009 38000 (1,378) 080 190 - Mid-Tex Gas Division Retirement 080.74011 37601 (2,623) 080 190 - Mid-Tex Gas Division Retirement 080.74011 37602 (6,493) 080 190 - Mid-Tex Gas Division Retirement 080.74011 38000 (33,699) 080 190 - Mid-Tex Gas Division Retirement 080.74027 37601 (45) 080 190 - Mid-Tex Gas Division Retirement 080.74028 37601 (331) 080 190 - Mid-Tex Gas Division Retirement 080.74028 37602 (267) 080 190 - Mid-Tex Gas Division Retirement 080.74028 38000 (2,543) 080 190 - Mid-Tex Gas Division Retirement 080.74031 37601 (520) 080 190 - Mid-Tex Gas Division Retirement 080.74031 37602 (1,045) 080 190 - Mid-Tex Gas Division Retirement 080.74031 38000 (8,283) 080 190 - Mid-Tex Gas Division Retirement 080.74032 37601 (525) 080 190 - Mid-Tex Gas Division Retirement 080.74032 37602 (1,814) 080 190 - Mid-Tex Gas Division Retirement 080.74032 38000 (4,699) 080 190 - Mid-Tex Gas Division Retirement 080.74038 37601 (99) 080 190 - Mid-Tex Gas Division Retirement 080.74038 37800 (24,310) 080 190 - Mid-Tex Gas Division Retirement 080.74038 38000 (544) 080 190 - Mid-Tex Gas Division Retirement 080.74039 37601 (1,779) 080 190 - Mid-Tex Gas Division Retirement 080.74039 37602 (6,733) 080 190 - Mid-Tex Gas Division Retirement 080.74039 38000 (10,271) 080 190 - Mid-Tex Gas Division Retirement 080.74040 37601 (401) 080 190 - Mid-Tex Gas Division Retirement 080.74040 37602 (4,345) 080 190 - Mid-Tex Gas Division Retirement 080.74040 38000 (21,351) 080 190 - Mid-Tex Gas Division Retirement 080.74041 37601 (1,542) 080 190 - Mid-Tex Gas Division Retirement 080.74041 37602 (2,373) 080 190 - Mid-Tex Gas Division Retirement 080.74041 38000 (16,329) 080 190 - Mid-Tex Gas Division Retirement 080.74047 37601 34 080 190 - Mid-Tex Gas Division Retirement 080.74047 37602 (36) 080 190 - Mid-Tex Gas Division Retirement 080.74048 37601 (27,971) 080 190 - Mid-Tex Gas Division Retirement 080.74048 37602 (421) 080 190 - Mid-Tex Gas Division Retirement 080.74048 38000 (32,771) 080 190 - Mid-Tex Gas Division Retirement 080.74054 37601 (15,650) 080 190 - Mid-Tex Gas Division Retirement 080.74054 37602 (220) 080 190 - Mid-Tex Gas Division Retirement 080.74078 38000 77 080 190 - Mid-Tex Gas Division Retirement 080.74079 37601 (350) 080 190 - Mid-Tex Gas Division Retirement 080.74079 37602 3,729 080 190 - Mid-Tex Gas Division Retirement 080.74079 38000 (5,066) 080 190 - Mid-Tex Gas Division Retirement 080.74086 37601 (2,779) 080 190 - Mid-Tex Gas Division Retirement 080.74086 37602 (9,844) 080 190 - Mid-Tex Gas Division Retirement 080.74087 37601 (3,511) 080 190 - Mid-Tex Gas Division Retirement 080.74087 38000 (363) 080 190 - Mid-Tex Gas Division Retirement 080.74098 37601 (11,659) 080 190 - Mid-Tex Gas Division Retirement 080.74098 37602 (2,108) 080 190 - Mid-Tex Gas Division Retirement 080.74098 38000 (1,604) 080 190 - Mid-Tex Gas Division Retirement 080.74114 37602 (12,812) 080 190 - Mid-Tex Gas Division Retirement 080.74119 37601 (746) 080 190 - Mid-Tex Gas Division Retirement 080.74119 37602 (17,939) 080 190 - Mid-Tex Gas Division Retirement 080.74119 38000 (17,086) 080 190 - Mid-Tex Gas Division Retirement 080.74121 37601 (22,411) 080 190 - Mid-Tex Gas Division Retirement 080.74121 37602 (21,086) 080 190 - Mid-Tex Gas Division Retirement 080.74121 37800 (46,110) 080 190 - Mid-Tex Gas Division Retirement 080.74121 38000 (67,423) 080 190 - Mid-Tex Gas Division Retirement 080.74122 37601 (1,045) 080 190 - Mid-Tex Gas Division Retirement 080.74122 38000 153 080 190 - Mid-Tex Gas Division Retirement 080.74127 37602 (4,101) 080 190 - Mid-Tex Gas Division Retirement 080.74136 38000 421 080 190 - Mid-Tex Gas Division Retirement 080.74137 37601 (7,053) 080 190 - Mid-Tex Gas Division Retirement 080.74137 37602 (161) 080 190 - Mid-Tex Gas Division Retirement 080.74137 38000 (7,018) 080 190 - Mid-Tex Gas Division Retirement 080.74140 37601 (2,133) 080 190 - Mid-Tex Gas Division Retirement 080.74159 37601 (4,169) 080 190 - Mid-Tex Gas Division Retirement 080.74159 37602 (6,650) 080 190 - Mid-Tex Gas Division Retirement 080.74159 38000 (3,145) 080 190 - Mid-Tex Gas Division Retirement 080.74174 37601 (4,748) 080 190 - Mid-Tex Gas Division Retirement 080.74174 38000 (1,082) 080 190 - Mid-Tex Gas Division Retirement 080.74184 37601 (2,321) 080 190 - Mid-Tex Gas Division Retirement 080.74184 38000 (1,424) 080 190 - Mid-Tex Gas Division Retirement 080.74188 37601 (4,375) 080 190 - Mid-Tex Gas Division Retirement 080.74188 37602 (5,288) 080 190 - Mid-Tex Gas Division Retirement 080.74188 38000 (577) 080 190 - Mid-Tex Gas Division Retirement 080.74208 38000 (3,120) 080 190 - Mid-Tex Gas Division Retirement 080.74257 37601 (1,856) 080 190 - Mid-Tex Gas Division Retirement 080.74257 37602 (4,410) 080 190 - Mid-Tex Gas Division Retirement 080.74257 38000 (544) 080 190 - Mid-Tex Gas Division Retirement 080.74259 37601 (1,615) 080 190 - Mid-Tex Gas Division Retirement 080.74259 38000 (51) 080 190 - Mid-Tex Gas Division Retirement 080.74260 37601 (1,303) MTX Retirements by FERC Page 10 of 30 556 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.74260 37602 (11,928) 080 190 - Mid-Tex Gas Division Retirement 080.74260 37800 (59,952) 080 190 - Mid-Tex Gas Division Retirement 080.74260 38000 (22,859) 080 190 - Mid-Tex Gas Division Retirement 080.74266 37601 (5,005) 080 190 - Mid-Tex Gas Division Retirement 080.74266 38000 (1,259) 080 190 - Mid-Tex Gas Division Retirement 080.74295 37601 (158,008) 080 190 - Mid-Tex Gas Division Retirement 080.74295 38000 (371) 080 190 - Mid-Tex Gas Division Retirement 080.74299 37602 (77,147) 080 190 - Mid-Tex Gas Division Retirement 080.74299 38000 (25,166) 080 190 - Mid-Tex Gas Division Retirement 080.74305 37601 (2,450) 080 190 - Mid-Tex Gas Division Retirement 080.74305 38000 (16,046) 080 190 - Mid-Tex Gas Division Retirement 080.74312 37601 (135) 080 190 - Mid-Tex Gas Division Retirement 080.74312 38000 (165) 080 190 - Mid-Tex Gas Division Retirement 080.74313 37601 (20,417) 080 190 - Mid-Tex Gas Division Retirement 080.74313 38000 (45,230) 080 190 - Mid-Tex Gas Division Retirement 080.74318 37601 (100) 080 190 - Mid-Tex Gas Division Retirement 080.74318 37602 (92) 080 190 - Mid-Tex Gas Division Retirement 080.74318 37800 (9,643) 080 190 - Mid-Tex Gas Division Retirement 080.74320 37601 (96) 080 190 - Mid-Tex Gas Division Retirement 080.74320 37602 (1,970) 080 190 - Mid-Tex Gas Division Retirement 080.74320 37800 (26,562) 080 190 - Mid-Tex Gas Division Retirement 080.74320 38000 (683) 080 190 - Mid-Tex Gas Division Retirement 080.74321 37601 (17,280) 080 190 - Mid-Tex Gas Division Retirement 080.74321 37602 (2,086) 080 190 - Mid-Tex Gas Division Retirement 080.74328 37602 289 080 190 - Mid-Tex Gas Division Retirement 080.74335 37601 (3,265) 080 190 - Mid-Tex Gas Division Retirement 080.74335 38000 (1,628) 080 190 - Mid-Tex Gas Division Retirement 080.74340 38000 466 080 190 - Mid-Tex Gas Division Retirement 080.74341 37601 (1,477) 080 190 - Mid-Tex Gas Division Retirement 080.74341 37602 (153) 080 190 - Mid-Tex Gas Division Retirement 080.74341 38000 (70,151) 080 190 - Mid-Tex Gas Division Retirement 080.74343 37601 (17,950) 080 190 - Mid-Tex Gas Division Retirement 080.74343 37602 (322) 080 190 - Mid-Tex Gas Division Retirement 080.74343 38000 (20,426) 080 190 - Mid-Tex Gas Division Retirement 080.74344 37601 (2,833) 080 190 - Mid-Tex Gas Division Retirement 080.74344 38000 (16,102) 080 190 - Mid-Tex Gas Division Retirement 080.74345 37601 (2,114) 080 190 - Mid-Tex Gas Division Retirement 080.74345 37602 (3,199) 080 190 - Mid-Tex Gas Division Retirement 080.74345 38000 (2,992) 080 190 - Mid-Tex Gas Division Retirement 080.74346 37601 (4,805) 080 190 - Mid-Tex Gas Division Retirement 080.74346 38000 (74,000) 080 190 - Mid-Tex Gas Division Retirement 080.74347 37601 (4,569) 080 190 - Mid-Tex Gas Division Retirement 080.74347 38000 (50,324) 080 190 - Mid-Tex Gas Division Retirement 080.74348 37601 (1,465) 080 190 - Mid-Tex Gas Division Retirement 080.74348 37602 (168) 080 190 - Mid-Tex Gas Division Retirement 080.74348 38000 (29,501) 080 190 - Mid-Tex Gas Division Retirement 080.74349 37601 (1,765) 080 190 - Mid-Tex Gas Division Retirement 080.74349 38000 (42,364) 080 190 - Mid-Tex Gas Division Retirement 080.74353 37601 (119,335) 080 190 - Mid-Tex Gas Division Retirement 080.74353 37602 (5,976) 080 190 - Mid-Tex Gas Division Retirement 080.74353 38000 (4,748) 080 190 - Mid-Tex Gas Division Retirement 080.74356 37601 (287,362) 080 190 - Mid-Tex Gas Division Retirement 080.74356 38000 (914) 080 190 - Mid-Tex Gas Division Retirement 080.74362 37601 1,161 080 190 - Mid-Tex Gas Division Retirement 080.74362 37602 2,705 080 190 - Mid-Tex Gas Division Retirement 080.74362 38000 (5,281) 080 190 - Mid-Tex Gas Division Retirement 080.74386 37601 (5,571) 080 190 - Mid-Tex Gas Division Retirement 080.74386 38000 (6,584) 080 190 - Mid-Tex Gas Division Retirement 080.74402 37601 (2,132) 080 190 - Mid-Tex Gas Division Retirement 080.74402 37602 (991) 080 190 - Mid-Tex Gas Division Retirement 080.74402 38000 (6,903) 080 190 - Mid-Tex Gas Division Retirement 080.74404 37601 (1,358) 080 190 - Mid-Tex Gas Division Retirement 080.74404 37602 (661) 080 190 - Mid-Tex Gas Division Retirement 080.74404 38000 (3,301) 080 190 - Mid-Tex Gas Division Retirement 080.74408 38000 (462) 080 190 - Mid-Tex Gas Division Retirement 080.74410 37601 (19,064) 080 190 - Mid-Tex Gas Division Retirement 080.74410 37602 (38) 080 190 - Mid-Tex Gas Division Retirement 080.74410 38000 (16,080) 080 190 - Mid-Tex Gas Division Retirement 080.74415 37601 (16,647) 080 190 - Mid-Tex Gas Division Retirement 080.74415 38000 (7,135) 080 190 - Mid-Tex Gas Division Retirement 080.74416 37601 (8,556) 080 190 - Mid-Tex Gas Division Retirement 080.74416 38000 (36,028) 080 190 - Mid-Tex Gas Division Retirement 080.74417 37601 (11,337) 080 190 - Mid-Tex Gas Division Retirement 080.74417 38000 (6,427) 080 190 - Mid-Tex Gas Division Retirement 080.74418 37601 (38,856) 080 190 - Mid-Tex Gas Division Retirement 080.74418 38000 (6,378) 080 190 - Mid-Tex Gas Division Retirement 080.74419 37601 (18,653) 080 190 - Mid-Tex Gas Division Retirement 080.74419 38000 (19,836) 080 190 - Mid-Tex Gas Division Retirement 080.74421 37601 (24,463) 080 190 - Mid-Tex Gas Division Retirement 080.74421 38000 (2,154) 080 190 - Mid-Tex Gas Division Retirement 080.74422 37601 (22,261) 080 190 - Mid-Tex Gas Division Retirement 080.74422 38000 (18,282) 080 190 - Mid-Tex Gas Division Retirement 080.74425 37601 (7,386) 080 190 - Mid-Tex Gas Division Retirement 080.74425 38000 (1,475) 080 190 - Mid-Tex Gas Division Retirement 080.74430 37601 (3,784) 080 190 - Mid-Tex Gas Division Retirement 080.74430 38000 (119) 080 190 - Mid-Tex Gas Division Retirement 080.74433 37601 (120,160) 080 190 - Mid-Tex Gas Division Retirement 080.74433 37602 (102) 080 190 - Mid-Tex Gas Division Retirement 080.74433 38000 (11,887) 080 190 - Mid-Tex Gas Division Retirement 080.74435 37601 35 080 190 - Mid-Tex Gas Division Retirement 080.74435 38000 (1,110) 080 190 - Mid-Tex Gas Division Retirement 080.74439 37601 (21,399) 080 190 - Mid-Tex Gas Division Retirement 080.74439 38000 (989) 080 190 - Mid-Tex Gas Division Retirement 080.74440 37601 (17,698) 080 190 - Mid-Tex Gas Division Retirement 080.74440 37602 (2,848) 080 190 - Mid-Tex Gas Division Retirement 080.74440 38000 (496) 080 190 - Mid-Tex Gas Division Retirement 080.74441 37601 (2,663) 080 190 - Mid-Tex Gas Division Retirement 080.74441 37602 (2,224) 080 190 - Mid-Tex Gas Division Retirement 080.74441 38000 (9,717) 080 190 - Mid-Tex Gas Division Retirement 080.74442 37601 (5,374) 080 190 - Mid-Tex Gas Division Retirement 080.74442 37602 (627) 080 190 - Mid-Tex Gas Division Retirement 080.74442 38000 (2,345) 080 190 - Mid-Tex Gas Division Retirement 080.74443 37601 44,317 080 190 - Mid-Tex Gas Division Retirement 080.74443 37602 4 080 190 - Mid-Tex Gas Division Retirement 080.74443 38000 (13,698) 080 190 - Mid-Tex Gas Division Retirement 080.74450 37601 (1,132) 080 190 - Mid-Tex Gas Division Retirement 080.74450 38000 (3,968) MTX Retirements by FERC Page 11 of 30 557 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.74454 37601 (2,662) 080 190 - Mid-Tex Gas Division Retirement 080.74454 38000 (40,828) 080 190 - Mid-Tex Gas Division Retirement 080.74457 37602 78 080 190 - Mid-Tex Gas Division Retirement 080.74457 38000 (80) 080 190 - Mid-Tex Gas Division Retirement 080.74458 37601 (2,688) 080 190 - Mid-Tex Gas Division Retirement 080.74458 37602 (778) 080 190 - Mid-Tex Gas Division Retirement 080.74458 38000 (19,917) 080 190 - Mid-Tex Gas Division Retirement 080.74459 37601 (23) 080 190 - Mid-Tex Gas Division Retirement 080.74466 37601 (6,975) 080 190 - Mid-Tex Gas Division Retirement 080.74466 37602 (15,032) 080 190 - Mid-Tex Gas Division Retirement 080.74466 38000 (4,211) 080 190 - Mid-Tex Gas Division Retirement 080.74471 37601 (165,756) 080 190 - Mid-Tex Gas Division Retirement 080.74471 38000 (7,582) 080 190 - Mid-Tex Gas Division Retirement 080.74475 37601 (1,965) 080 190 - Mid-Tex Gas Division Retirement 080.74475 37602 (1,642) 080 190 - Mid-Tex Gas Division Retirement 080.74475 38000 (12,292) 080 190 - Mid-Tex Gas Division Retirement 080.74477 38000 (101) 080 190 - Mid-Tex Gas Division Retirement 080.74490 37601 (3,243) 080 190 - Mid-Tex Gas Division Retirement 080.74490 37602 (2,852) 080 190 - Mid-Tex Gas Division Retirement 080.74490 38000 (3,403) 080 190 - Mid-Tex Gas Division Retirement 080.74491 37602 94 080 190 - Mid-Tex Gas Division Retirement 080.74501 37601 (1,241) 080 190 - Mid-Tex Gas Division Retirement 080.74501 37602 7,902 080 190 - Mid-Tex Gas Division Retirement 080.74511 37601 (43,419) 080 190 - Mid-Tex Gas Division Retirement 080.74511 38000 (3,832) 080 190 - Mid-Tex Gas Division Retirement 080.74514 37601 (16,974) 080 190 - Mid-Tex Gas Division Retirement 080.74514 37602 (463) 080 190 - Mid-Tex Gas Division Retirement 080.74514 38000 (8,239) 080 190 - Mid-Tex Gas Division Retirement 080.74515 37601 (15,930) 080 190 - Mid-Tex Gas Division Retirement 080.74515 38000 (8,495) 080 190 - Mid-Tex Gas Division Retirement 080.74532 37601 (68,378) 080 190 - Mid-Tex Gas Division Retirement 080.74532 38000 (12,405) 080 190 - Mid-Tex Gas Division Retirement 080.74535 37601 (1,551) 080 190 - Mid-Tex Gas Division Retirement 080.74535 37800 (25,466) 080 190 - Mid-Tex Gas Division Retirement 080.74539 37601 (3,288,679) 080 190 - Mid-Tex Gas Division Retirement 080.74545 37601 (7,537) 080 190 - Mid-Tex Gas Division Retirement 080.74545 37602 (4,047) 080 190 - Mid-Tex Gas Division Retirement 080.74545 38000 (11,559) 080 190 - Mid-Tex Gas Division Retirement 080.74553 37601 (10,419) 080 190 - Mid-Tex Gas Division Retirement 080.74556 37601 940 080 190 - Mid-Tex Gas Division Retirement 080.74556 37602 (33) 080 190 - Mid-Tex Gas Division Retirement 080.74556 38000 (2,224) 080 190 - Mid-Tex Gas Division Retirement 080.74559 37601 111 080 190 - Mid-Tex Gas Division Retirement 080.74559 37602 (293) 080 190 - Mid-Tex Gas Division Retirement 080.74559 38000 1,603 080 190 - Mid-Tex Gas Division Retirement 080.74565 37601 (2,184) 080 190 - Mid-Tex Gas Division Retirement 080.74568 37601 (2,175) 080 190 - Mid-Tex Gas Division Retirement 080.74568 37602 (6,825) 080 190 - Mid-Tex Gas Division Retirement 080.74568 38000 (18,620) 080 190 - Mid-Tex Gas Division Retirement 080.74571 37601 (18,620) 080 190 - Mid-Tex Gas Division Retirement 080.74571 37602 (232) 080 190 - Mid-Tex Gas Division Retirement 080.74571 37800 (19,536) 080 190 - Mid-Tex Gas Division Retirement 080.74571 38000 (78) 080 190 - Mid-Tex Gas Division Retirement 080.74572 37601 (5,619) 080 190 - Mid-Tex Gas Division Retirement 080.74572 37602 (104) 080 190 - Mid-Tex Gas Division Retirement 080.74572 37800 (10,918) 080 190 - Mid-Tex Gas Division Retirement 080.74572 38000 (78) 080 190 - Mid-Tex Gas Division Retirement 080.74575 37601 (123,210) 080 190 - Mid-Tex Gas Division Retirement 080.74575 37602 (32,906) 080 190 - Mid-Tex Gas Division Retirement 080.74575 37800 (10,488) 080 190 - Mid-Tex Gas Division Retirement 080.74575 38000 (749) 080 190 - Mid-Tex Gas Division Retirement 080.74580 37602 673 080 190 - Mid-Tex Gas Division Retirement 080.74582 37601 (661) 080 190 - Mid-Tex Gas Division Retirement 080.74582 37602 (835) 080 190 - Mid-Tex Gas Division Retirement 080.74582 37800 (2,202) 080 190 - Mid-Tex Gas Division Retirement 080.74583 37601 (71) 080 190 - Mid-Tex Gas Division Retirement 080.74583 37800 (16,758) 080 190 - Mid-Tex Gas Division Retirement 080.74586 37602 (338) 080 190 - Mid-Tex Gas Division Retirement 080.74586 37800 (48,827) 080 190 - Mid-Tex Gas Division Retirement 080.74591 37601 (45) 080 190 - Mid-Tex Gas Division Retirement 080.74591 37602 (2,450) 080 190 - Mid-Tex Gas Division Retirement 080.74591 37800 (27,442) 080 190 - Mid-Tex Gas Division Retirement 080.74591 38000 (1,807) 080 190 - Mid-Tex Gas Division Retirement 080.74592 37601 (625) 080 190 - Mid-Tex Gas Division Retirement 080.74592 37602 (9,745) 080 190 - Mid-Tex Gas Division Retirement 080.74592 37800 (2,039) 080 190 - Mid-Tex Gas Division Retirement 080.74592 38000 (1,357) 080 190 - Mid-Tex Gas Division Retirement 080.74599 37601 (1,049) 080 190 - Mid-Tex Gas Division Retirement 080.74599 37602 (86) 080 190 - Mid-Tex Gas Division Retirement 080.74599 37800 (2,173) 080 190 - Mid-Tex Gas Division Retirement 080.74599 38000 (903) 080 190 - Mid-Tex Gas Division Retirement 080.74601 37601 (130) 080 190 - Mid-Tex Gas Division Retirement 080.74601 37602 (242) 080 190 - Mid-Tex Gas Division Retirement 080.74601 38000 5,311 080 190 - Mid-Tex Gas Division Retirement 080.74603 37601 (684) 080 190 - Mid-Tex Gas Division Retirement 080.74603 37602 (242) 080 190 - Mid-Tex Gas Division Retirement 080.74603 37800 (1,324) 080 190 - Mid-Tex Gas Division Retirement 080.74604 37601 (80) 080 190 - Mid-Tex Gas Division Retirement 080.74604 37800 (3,191) 080 190 - Mid-Tex Gas Division Retirement 080.74606 37601 (223) 080 190 - Mid-Tex Gas Division Retirement 080.74606 37602 (291) 080 190 - Mid-Tex Gas Division Retirement 080.74606 37800 (30,181) 080 190 - Mid-Tex Gas Division Retirement 080.74606 38000 (284) 080 190 - Mid-Tex Gas Division Retirement 080.74609 37601 (1,224) 080 190 - Mid-Tex Gas Division Retirement 080.74609 37602 (77) 080 190 - Mid-Tex Gas Division Retirement 080.74609 37800 (1,511) 080 190 - Mid-Tex Gas Division Retirement 080.74609 38000 (259) 080 190 - Mid-Tex Gas Division Retirement 080.74610 37602 (67) 080 190 - Mid-Tex Gas Division Retirement 080.74610 37800 (49,136) 080 190 - Mid-Tex Gas Division Retirement 080.74615 38000 (3,369) 080 190 - Mid-Tex Gas Division Retirement 080.74617 37601 (1,388) 080 190 - Mid-Tex Gas Division Retirement 080.74617 37602 (303) 080 190 - Mid-Tex Gas Division Retirement 080.74617 38000 (6) 080 190 - Mid-Tex Gas Division Retirement 080.74623 37601 (3,523) 080 190 - Mid-Tex Gas Division Retirement 080.74623 38000 (1,011) 080 190 - Mid-Tex Gas Division Retirement 080.74625 37601 939 080 190 - Mid-Tex Gas Division Retirement 080.74625 37602 (1,014) MTX Retirements by FERC Page 12 of 30 558 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.74625 38000 3,885 080 190 - Mid-Tex Gas Division Retirement 080.74631 38000 (658) 080 190 - Mid-Tex Gas Division Retirement 080.74633 37601 (91) 080 190 - Mid-Tex Gas Division Retirement 080.74633 37602 (10) 080 190 - Mid-Tex Gas Division Retirement 080.74636 37601 (16,874) 080 190 - Mid-Tex Gas Division Retirement 080.74636 38000 (575) 080 190 - Mid-Tex Gas Division Retirement 080.74642 37601 (11,542) 080 190 - Mid-Tex Gas Division Retirement 080.74642 37602 (890) 080 190 - Mid-Tex Gas Division Retirement 080.74642 38000 (7,147) 080 190 - Mid-Tex Gas Division Retirement 080.74643 37601 (561) 080 190 - Mid-Tex Gas Division Retirement 080.74643 37602 (429) 080 190 - Mid-Tex Gas Division Retirement 080.74643 38000 (752) 080 190 - Mid-Tex Gas Division Retirement 080.74647 37601 (2,115) 080 190 - Mid-Tex Gas Division Retirement 080.74647 38000 (13,337) 080 190 - Mid-Tex Gas Division Retirement 080.74648 37601 (7,487) 080 190 - Mid-Tex Gas Division Retirement 080.74648 37602 (5,828) 080 190 - Mid-Tex Gas Division Retirement 080.74648 38000 (6,606) 080 190 - Mid-Tex Gas Division Retirement 080.74650 37601 (10,357) 080 190 - Mid-Tex Gas Division Retirement 080.74650 37602 (13,000) 080 190 - Mid-Tex Gas Division Retirement 080.74650 38000 (1,176) 080 190 - Mid-Tex Gas Division Retirement 080.74657 37601 (911) 080 190 - Mid-Tex Gas Division Retirement 080.74657 38000 (23,122) 080 190 - Mid-Tex Gas Division Retirement 080.74664 37601 (15,382) 080 190 - Mid-Tex Gas Division Retirement 080.74664 38000 (3,588) 080 190 - Mid-Tex Gas Division Retirement 080.74665 37601 (9,125) 080 190 - Mid-Tex Gas Division Retirement 080.74665 38000 (9,666) 080 190 - Mid-Tex Gas Division Retirement 080.74666 37601 (5,770) 080 190 - Mid-Tex Gas Division Retirement 080.74666 38000 (14,832) 080 190 - Mid-Tex Gas Division Retirement 080.74669 37601 (378) 080 190 - Mid-Tex Gas Division Retirement 080.74669 37602 (3,315) 080 190 - Mid-Tex Gas Division Retirement 080.74669 38000 (7,943) 080 190 - Mid-Tex Gas Division Retirement 080.74671 37601 (2,011) 080 190 - Mid-Tex Gas Division Retirement 080.74671 37602 (2,389) 080 190 - Mid-Tex Gas Division Retirement 080.74671 38000 (6,642) 080 190 - Mid-Tex Gas Division Retirement 080.74672 37601 (1,474) 080 190 - Mid-Tex Gas Division Retirement 080.74672 37602 (5,619) 080 190 - Mid-Tex Gas Division Retirement 080.74672 38000 (25,752) 080 190 - Mid-Tex Gas Division Retirement 080.74673 37601 (6,187) 080 190 - Mid-Tex Gas Division Retirement 080.74673 37602 (965) 080 190 - Mid-Tex Gas Division Retirement 080.74673 38000 (1,901) 080 190 - Mid-Tex Gas Division Retirement 080.74674 37601 (5,780) 080 190 - Mid-Tex Gas Division Retirement 080.74674 37602 (482) 080 190 - Mid-Tex Gas Division Retirement 080.74674 38000 (25,512) 080 190 - Mid-Tex Gas Division Retirement 080.74675 37601 (22,982) 080 190 - Mid-Tex Gas Division Retirement 080.74675 37602 (145) 080 190 - Mid-Tex Gas Division Retirement 080.74675 38000 (12,537) 080 190 - Mid-Tex Gas Division Retirement 080.74676 37601 (9,505) 080 190 - Mid-Tex Gas Division Retirement 080.74676 38000 (21,670) 080 190 - Mid-Tex Gas Division Retirement 080.74677 37601 (34,587) 080 190 - Mid-Tex Gas Division Retirement 080.74677 38000 (24,918) 080 190 - Mid-Tex Gas Division Retirement 080.74678 37601 (53,458) 080 190 - Mid-Tex Gas Division Retirement 080.74678 38000 (52,776) 080 190 - Mid-Tex Gas Division Retirement 080.74679 37601 (63,565) 080 190 - Mid-Tex Gas Division Retirement 080.74679 38000 (9,894) 080 190 - Mid-Tex Gas Division Retirement 080.74680 37601 (4,931) 080 190 - Mid-Tex Gas Division Retirement 080.74680 38000 (26,530) 080 190 - Mid-Tex Gas Division Retirement 080.74681 37601 (3,183) 080 190 - Mid-Tex Gas Division Retirement 080.74681 37602 (263) 080 190 - Mid-Tex Gas Division Retirement 080.74681 38000 (19,660) 080 190 - Mid-Tex Gas Division Retirement 080.74682 37601 (29,540) 080 190 - Mid-Tex Gas Division Retirement 080.74682 38000 (8,683) 080 190 - Mid-Tex Gas Division Retirement 080.74684 37601 (7,107) 080 190 - Mid-Tex Gas Division Retirement 080.74684 38000 (23,634) 080 190 - Mid-Tex Gas Division Retirement 080.74692 37602 (998) 080 190 - Mid-Tex Gas Division Retirement 080.74693 37601 (6,903) 080 190 - Mid-Tex Gas Division Retirement 080.74693 38000 (18,238) 080 190 - Mid-Tex Gas Division Retirement 080.74703 37601 35,381 080 190 - Mid-Tex Gas Division Retirement 080.74703 37602 14 080 190 - Mid-Tex Gas Division Retirement 080.74703 38000 (11,489) 080 190 - Mid-Tex Gas Division Retirement 080.74704 37601 (188) 080 190 - Mid-Tex Gas Division Retirement 080.74704 37800 (22,576) 080 190 - Mid-Tex Gas Division Retirement 080.74705 37601 (667) 080 190 - Mid-Tex Gas Division Retirement 080.74705 37602 (36) 080 190 - Mid-Tex Gas Division Retirement 080.74705 37800 (30,060) 080 190 - Mid-Tex Gas Division Retirement 080.74706 37601 (32) 080 190 - Mid-Tex Gas Division Retirement 080.74706 37800 (8,948) 080 190 - Mid-Tex Gas Division Retirement 080.74709 37601 (37,216) 080 190 - Mid-Tex Gas Division Retirement 080.74709 37602 (174) 080 190 - Mid-Tex Gas Division Retirement 080.74709 38000 (18,240) 080 190 - Mid-Tex Gas Division Retirement 080.74710 37602 (421) 080 190 - Mid-Tex Gas Division Retirement 080.74715 39200 (49,238) 080 190 - Mid-Tex Gas Division Retirement 080.74715 39400 (4,914) 080 190 - Mid-Tex Gas Division Retirement 080.74719 37601 (402) 080 190 - Mid-Tex Gas Division Retirement 080.74719 37602 (5,982) 080 190 - Mid-Tex Gas Division Retirement 080.74719 37800 (68,862) 080 190 - Mid-Tex Gas Division Retirement 080.74719 38000 (3,086) 080 190 - Mid-Tex Gas Division Retirement 080.74726 37601 228 080 190 - Mid-Tex Gas Division Retirement 080.74726 37602 (13,036) 080 190 - Mid-Tex Gas Division Retirement 080.74739 37601 (5,280) 080 190 - Mid-Tex Gas Division Retirement 080.74739 38000 (805) 080 190 - Mid-Tex Gas Division Retirement 080.74746 37602 (13,800) 080 190 - Mid-Tex Gas Division Retirement 080.74747 37601 (890) 080 190 - Mid-Tex Gas Division Retirement 080.74747 37602 (423) 080 190 - Mid-Tex Gas Division Retirement 080.74747 38000 (19,509) 080 190 - Mid-Tex Gas Division Retirement 080.74752 38000 2,866 080 190 - Mid-Tex Gas Division Retirement 080.74753 37601 (157,999) 080 190 - Mid-Tex Gas Division Retirement 080.74753 37602 (25,144) 080 190 - Mid-Tex Gas Division Retirement 080.74753 38000 (17,657) 080 190 - Mid-Tex Gas Division Retirement 080.74756 37601 (31,654) 080 190 - Mid-Tex Gas Division Retirement 080.74756 37602 (1,081) 080 190 - Mid-Tex Gas Division Retirement 080.74756 37800 (114,068) 080 190 - Mid-Tex Gas Division Retirement 080.74757 37601 (791) 080 190 - Mid-Tex Gas Division Retirement 080.74757 37602 (22,524) 080 190 - Mid-Tex Gas Division Retirement 080.74757 38000 (3,578) 080 190 - Mid-Tex Gas Division Retirement 080.74759 37601 689 080 190 - Mid-Tex Gas Division Retirement 080.74759 37602 (1,268) 080 190 - Mid-Tex Gas Division Retirement 080.74759 38000 (2,896) MTX Retirements by FERC Page 13 of 30 559 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.74762 38000 (3,652) 080 190 - Mid-Tex Gas Division Retirement 080.74771 37601 (29) 080 190 - Mid-Tex Gas Division Retirement 080.74773 37800 (195,493) 080 190 - Mid-Tex Gas Division Retirement 080.74775 37601 (4,529) 080 190 - Mid-Tex Gas Division Retirement 080.74775 37800 (36,307) 080 190 - Mid-Tex Gas Division Retirement 080.74776 37601 (96,054) 080 190 - Mid-Tex Gas Division Retirement 080.74776 37800 (134,920) 080 190 - Mid-Tex Gas Division Retirement 080.74778 38000 (9,915) 080 190 - Mid-Tex Gas Division Retirement 080.74779 37602 (653) 080 190 - Mid-Tex Gas Division Retirement 080.74779 38000 (32,194) 080 190 - Mid-Tex Gas Division Retirement 080.74780 37601 (9,949) 080 190 - Mid-Tex Gas Division Retirement 080.74780 37800 (17,650) 080 190 - Mid-Tex Gas Division Retirement 080.74782 37601 (5,939) 080 190 - Mid-Tex Gas Division Retirement 080.74782 37602 (852) 080 190 - Mid-Tex Gas Division Retirement 080.74782 38000 (10,222) 080 190 - Mid-Tex Gas Division Retirement 080.74783 37601 (1,471) 080 190 - Mid-Tex Gas Division Retirement 080.74783 37800 (32,257) 080 190 - Mid-Tex Gas Division Retirement 080.74786 37602 (1,013) 080 190 - Mid-Tex Gas Division Retirement 080.74786 38000 (1,801) 080 190 - Mid-Tex Gas Division Retirement 080.74794 37601 (8,111) 080 190 - Mid-Tex Gas Division Retirement 080.74794 38000 (16,366) 080 190 - Mid-Tex Gas Division Retirement 080.74799 37601 (3,906) 080 190 - Mid-Tex Gas Division Retirement 080.74799 37602 (670) 080 190 - Mid-Tex Gas Division Retirement 080.74799 38000 (16,365) 080 190 - Mid-Tex Gas Division Retirement 080.74807 37602 360 080 190 - Mid-Tex Gas Division Retirement 080.74808 37601 (184) 080 190 - Mid-Tex Gas Division Retirement 080.74808 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.74809 37601 (1,944) 080 190 - Mid-Tex Gas Division Retirement 080.74809 37602 (15) 080 190 - Mid-Tex Gas Division Retirement 080.74809 38000 (1,031) 080 190 - Mid-Tex Gas Division Retirement 080.74822 37601 (1,051) 080 190 - Mid-Tex Gas Division Retirement 080.74822 37602 (18,228) 080 190 - Mid-Tex Gas Division Retirement 080.74825 37602 (30,396) 080 190 - Mid-Tex Gas Division Retirement 080.74825 38000 (1,559) 080 190 - Mid-Tex Gas Division Retirement 080.74828 37602 (62) 080 190 - Mid-Tex Gas Division Retirement 080.74828 37800 (798) 080 190 - Mid-Tex Gas Division Retirement 080.74830 37601 (22) 080 190 - Mid-Tex Gas Division Retirement 080.74830 37602 (77) 080 190 - Mid-Tex Gas Division Retirement 080.74830 37800 (2,380) 080 190 - Mid-Tex Gas Division Retirement 080.74831 37602 (201) 080 190 - Mid-Tex Gas Division Retirement 080.74831 37800 (1,922) 080 190 - Mid-Tex Gas Division Retirement 080.74835 37601 (33) 080 190 - Mid-Tex Gas Division Retirement 080.74835 37800 (1,084) 080 190 - Mid-Tex Gas Division Retirement 080.74839 37601 (10) 080 190 - Mid-Tex Gas Division Retirement 080.74839 37602 (38) 080 190 - Mid-Tex Gas Division Retirement 080.74839 37800 (2,309) 080 190 - Mid-Tex Gas Division Retirement 080.74845 37601 (3,269) 080 190 - Mid-Tex Gas Division Retirement 080.74845 38000 (1,388) 080 190 - Mid-Tex Gas Division Retirement 080.74847 37601 (11,746) 080 190 - Mid-Tex Gas Division Retirement 080.74847 37602 (905) 080 190 - Mid-Tex Gas Division Retirement 080.74847 38000 (3,875) 080 190 - Mid-Tex Gas Division Retirement 080.74854 37601 (2,543) 080 190 - Mid-Tex Gas Division Retirement 080.74854 38000 (31,880) 080 190 - Mid-Tex Gas Division Retirement 080.74861 37602 19 080 190 - Mid-Tex Gas Division Retirement 080.74863 37602 12,643 080 190 - Mid-Tex Gas Division Retirement 080.74866 37601 (296) 080 190 - Mid-Tex Gas Division Retirement 080.74866 37800 (12,928) 080 190 - Mid-Tex Gas Division Retirement 080.74867 37601 (950) 080 190 - Mid-Tex Gas Division Retirement 080.74867 37602 (538) 080 190 - Mid-Tex Gas Division Retirement 080.74867 37800 (2,769) 080 190 - Mid-Tex Gas Division Retirement 080.74867 38000 (3,312) 080 190 - Mid-Tex Gas Division Retirement 080.74868 37601 (696) 080 190 - Mid-Tex Gas Division Retirement 080.74868 37602 (2,455) 080 190 - Mid-Tex Gas Division Retirement 080.74868 37800 (16,425) 080 190 - Mid-Tex Gas Division Retirement 080.74868 38000 (373) 080 190 - Mid-Tex Gas Division Retirement 080.74869 37601 (188) 080 190 - Mid-Tex Gas Division Retirement 080.74869 37800 (4,445) 080 190 - Mid-Tex Gas Division Retirement 080.74873 37601 (163) 080 190 - Mid-Tex Gas Division Retirement 080.74873 37602 (31) 080 190 - Mid-Tex Gas Division Retirement 080.74873 37800 (31,927) 080 190 - Mid-Tex Gas Division Retirement 080.74874 37601 (202) 080 190 - Mid-Tex Gas Division Retirement 080.74874 37602 (73) 080 190 - Mid-Tex Gas Division Retirement 080.74874 37800 (3,967) 080 190 - Mid-Tex Gas Division Retirement 080.74875 37601 (179) 080 190 - Mid-Tex Gas Division Retirement 080.74875 37602 (42) 080 190 - Mid-Tex Gas Division Retirement 080.74875 37800 (12,450) 080 190 - Mid-Tex Gas Division Retirement 080.74877 37601 (80) 080 190 - Mid-Tex Gas Division Retirement 080.74877 37602 (128) 080 190 - Mid-Tex Gas Division Retirement 080.74877 37800 (21,428) 080 190 - Mid-Tex Gas Division Retirement 080.74879 37601 (72) 080 190 - Mid-Tex Gas Division Retirement 080.74879 37602 (1,057) 080 190 - Mid-Tex Gas Division Retirement 080.74879 37800 (24,533) 080 190 - Mid-Tex Gas Division Retirement 080.74879 38000 (313) 080 190 - Mid-Tex Gas Division Retirement 080.74881 37601 (43,861) 080 190 - Mid-Tex Gas Division Retirement 080.74881 37602 (407) 080 190 - Mid-Tex Gas Division Retirement 080.74881 38000 (3,538) 080 190 - Mid-Tex Gas Division Retirement 080.74888 37601 (36,513) 080 190 - Mid-Tex Gas Division Retirement 080.74889 37602 (50,402) 080 190 - Mid-Tex Gas Division Retirement 080.74893 37601 (2,417) 080 190 - Mid-Tex Gas Division Retirement 080.74893 37602 (876) 080 190 - Mid-Tex Gas Division Retirement 080.74893 38000 (2,135) 080 190 - Mid-Tex Gas Division Retirement 080.74898 37601 (91,226) 080 190 - Mid-Tex Gas Division Retirement 080.74898 37602 (4,601) 080 190 - Mid-Tex Gas Division Retirement 080.74898 38000 (13,989) 080 190 - Mid-Tex Gas Division Retirement 080.74905 37602 (684) 080 190 - Mid-Tex Gas Division Retirement 080.74905 38000 (29,387) 080 190 - Mid-Tex Gas Division Retirement 080.74906 37601 (1,907) 080 190 - Mid-Tex Gas Division Retirement 080.74906 37602 (3,828) 080 190 - Mid-Tex Gas Division Retirement 080.74906 38000 (4,783) 080 190 - Mid-Tex Gas Division Retirement 080.74909 37601 (3,105) 080 190 - Mid-Tex Gas Division Retirement 080.74909 38000 (7,076) 080 190 - Mid-Tex Gas Division Retirement 080.74913 37602 (427) 080 190 - Mid-Tex Gas Division Retirement 080.74924 37602 (464) 080 190 - Mid-Tex Gas Division Retirement 080.74925 37601 (2,039) 080 190 - Mid-Tex Gas Division Retirement 080.74925 38000 (1,859) 080 190 - Mid-Tex Gas Division Retirement 080.74930 37601 (14,394) 080 190 - Mid-Tex Gas Division Retirement 080.74930 37602 (20) MTX Retirements by FERC Page 14 of 30 560 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.74937 37601 3,789 080 190 - Mid-Tex Gas Division Retirement 080.74937 37602 (2,046) 080 190 - Mid-Tex Gas Division Retirement 080.74937 38000 (679) 080 190 - Mid-Tex Gas Division Retirement 080.74939 37601 (309) 080 190 - Mid-Tex Gas Division Retirement 080.74939 37602 (2,601) 080 190 - Mid-Tex Gas Division Retirement 080.74946 37602 (32) 080 190 - Mid-Tex Gas Division Retirement 080.74956 37601 (4,543) 080 190 - Mid-Tex Gas Division Retirement 080.74958 37601 (3,106) 080 190 - Mid-Tex Gas Division Retirement 080.74979 37602 (7,163) 080 190 - Mid-Tex Gas Division Retirement 080.74980 37601 (849) 080 190 - Mid-Tex Gas Division Retirement 080.74981 37601 (6,577) 080 190 - Mid-Tex Gas Division Retirement 080.74981 38000 (18,104) 080 190 - Mid-Tex Gas Division Retirement 080.74983 37601 (2,352) 080 190 - Mid-Tex Gas Division Retirement 080.74983 38000 (4,931) 080 190 - Mid-Tex Gas Division Retirement 080.74984 37601 (3,592) 080 190 - Mid-Tex Gas Division Retirement 080.74984 37602 (1,512) 080 190 - Mid-Tex Gas Division Retirement 080.74984 38000 (27,284) 080 190 - Mid-Tex Gas Division Retirement 080.74985 37800 (4,628) 080 190 - Mid-Tex Gas Division Retirement 080.74986 38000 347 080 190 - Mid-Tex Gas Division Retirement 080.74988 38000 (2,703) 080 190 - Mid-Tex Gas Division Retirement 080.74993 37601 (21,941) 080 190 - Mid-Tex Gas Division Retirement 080.74993 37602 (114) 080 190 - Mid-Tex Gas Division Retirement 080.74993 38000 (11,295) 080 190 - Mid-Tex Gas Division Retirement 080.74996 37601 (1,385) 080 190 - Mid-Tex Gas Division Retirement 080.74996 37602 (9,719) 080 190 - Mid-Tex Gas Division Retirement 080.74996 38000 (6,416) 080 190 - Mid-Tex Gas Division Retirement 080.75025 37601 (4,122) 080 190 - Mid-Tex Gas Division Retirement 080.75025 38000 (424) 080 190 - Mid-Tex Gas Division Retirement 080.75029 38000 1,480 080 190 - Mid-Tex Gas Division Retirement 080.75032 37601 (4,301) 080 190 - Mid-Tex Gas Division Retirement 080.75032 38000 (3,096) 080 190 - Mid-Tex Gas Division Retirement 080.75041 38000 233 080 190 - Mid-Tex Gas Division Retirement 080.75048 37602 (19,728) 080 190 - Mid-Tex Gas Division Retirement 080.75048 38000 (22,229) 080 190 - Mid-Tex Gas Division Retirement 080.75054 37601 (245) 080 190 - Mid-Tex Gas Division Retirement 080.75054 37602 (162) 080 190 - Mid-Tex Gas Division Retirement 080.75054 38000 (254) 080 190 - Mid-Tex Gas Division Retirement 080.75058 37601 (44,838) 080 190 - Mid-Tex Gas Division Retirement 080.75059 37601 (5,040) 080 190 - Mid-Tex Gas Division Retirement 080.75059 38000 (15,009) 080 190 - Mid-Tex Gas Division Retirement 080.75066 37602 36 080 190 - Mid-Tex Gas Division Retirement 080.75067 37601 (1,146) 080 190 - Mid-Tex Gas Division Retirement 080.75067 38000 (293) 080 190 - Mid-Tex Gas Division Retirement 080.75068 37601 (1,440) 080 190 - Mid-Tex Gas Division Retirement 080.75068 38000 (4,696) 080 190 - Mid-Tex Gas Division Retirement 080.75069 37601 (2,818) 080 190 - Mid-Tex Gas Division Retirement 080.75069 37602 (56) 080 190 - Mid-Tex Gas Division Retirement 080.75069 38000 (19,590) 080 190 - Mid-Tex Gas Division Retirement 080.75071 37601 (2,267) 080 190 - Mid-Tex Gas Division Retirement 080.75071 37602 (391) 080 190 - Mid-Tex Gas Division Retirement 080.75071 38000 (6,067) 080 190 - Mid-Tex Gas Division Retirement 080.75072 37601 (26,835) 080 190 - Mid-Tex Gas Division Retirement 080.75072 37602 (448) 080 190 - Mid-Tex Gas Division Retirement 080.75072 38000 (12,116) 080 190 - Mid-Tex Gas Division Retirement 080.75073 37602 (5,825) 080 190 - Mid-Tex Gas Division Retirement 080.75073 38000 (2,667) 080 190 - Mid-Tex Gas Division Retirement 080.75074 37601 2,352 080 190 - Mid-Tex Gas Division Retirement 080.75074 38000 (21,852) 080 190 - Mid-Tex Gas Division Retirement 080.75077 37601 (24) 080 190 - Mid-Tex Gas Division Retirement 080.75077 37800 (68,193) 080 190 - Mid-Tex Gas Division Retirement 080.75078 37601 (15,734) 080 190 - Mid-Tex Gas Division Retirement 080.75078 37602 (2,148) 080 190 - Mid-Tex Gas Division Retirement 080.75078 38000 (5) 080 190 - Mid-Tex Gas Division Retirement 080.75083 37602 (10,490) 080 190 - Mid-Tex Gas Division Retirement 080.75083 38000 (27,028) 080 190 - Mid-Tex Gas Division Retirement 080.75084 37601 (263,559) 080 190 - Mid-Tex Gas Division Retirement 080.75084 37800 (21,825) 080 190 - Mid-Tex Gas Division Retirement 080.75084 38100 (4,642) 080 190 - Mid-Tex Gas Division Retirement 080.75091 37601 (1,764) 080 190 - Mid-Tex Gas Division Retirement 080.75091 38000 (823) 080 190 - Mid-Tex Gas Division Retirement 080.75098 37601 (19) 080 190 - Mid-Tex Gas Division Retirement 080.75098 37602 332 080 190 - Mid-Tex Gas Division Retirement 080.75112 37601 2,195 080 190 - Mid-Tex Gas Division Retirement 080.75112 38000 608 080 190 - Mid-Tex Gas Division Retirement 080.75115 37601 (533) 080 190 - Mid-Tex Gas Division Retirement 080.75115 37602 (1,057) 080 190 - Mid-Tex Gas Division Retirement 080.75115 38000 (1,081) 080 190 - Mid-Tex Gas Division Retirement 080.75124 37601 (545) 080 190 - Mid-Tex Gas Division Retirement 080.75124 37602 (739) 080 190 - Mid-Tex Gas Division Retirement 080.75124 38000 (9,486) 080 190 - Mid-Tex Gas Division Retirement 080.75132 37601 (273) 080 190 - Mid-Tex Gas Division Retirement 080.75133 37601 (3,467) 080 190 - Mid-Tex Gas Division Retirement 080.75133 37602 (33,207) 080 190 - Mid-Tex Gas Division Retirement 080.75133 38000 (17,507) 080 190 - Mid-Tex Gas Division Retirement 080.75146 37601 (4,302) 080 190 - Mid-Tex Gas Division Retirement 080.75146 38000 (40,538) 080 190 - Mid-Tex Gas Division Retirement 080.75147 37602 (1,105) 080 190 - Mid-Tex Gas Division Retirement 080.75147 38000 (119,087) 080 190 - Mid-Tex Gas Division Retirement 080.75152 37602 (865) 080 190 - Mid-Tex Gas Division Retirement 080.75152 38000 (4,150) 080 190 - Mid-Tex Gas Division Retirement 080.75159 37601 (8,301) 080 190 - Mid-Tex Gas Division Retirement 080.75159 37602 (38,173) 080 190 - Mid-Tex Gas Division Retirement 080.75159 38000 (7,119) 080 190 - Mid-Tex Gas Division Retirement 080.75160 37601 (2,929) 080 190 - Mid-Tex Gas Division Retirement 080.75160 38000 (31,396) 080 190 - Mid-Tex Gas Division Retirement 080.75161 37601 (36,926) 080 190 - Mid-Tex Gas Division Retirement 080.75161 37602 (2,016) 080 190 - Mid-Tex Gas Division Retirement 080.75161 38000 (11,446) 080 190 - Mid-Tex Gas Division Retirement 080.75162 37602 (1,568) 080 190 - Mid-Tex Gas Division Retirement 080.75162 38000 (2,531) 080 190 - Mid-Tex Gas Division Retirement 080.75170 37800 (51,213) 080 190 - Mid-Tex Gas Division Retirement 080.75171 37601 (4,108) 080 190 - Mid-Tex Gas Division Retirement 080.75171 37602 (261) 080 190 - Mid-Tex Gas Division Retirement 080.75171 37800 (19,990) 080 190 - Mid-Tex Gas Division Retirement 080.75174 37601 (10,752) 080 190 - Mid-Tex Gas Division Retirement 080.75174 37602 (123) 080 190 - Mid-Tex Gas Division Retirement 080.75174 37800 (13,756) MTX Retirements by FERC Page 15 of 30 561 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.75175 37800 (17,646) 080 190 - Mid-Tex Gas Division Retirement 080.75184 37601 (511) 080 190 - Mid-Tex Gas Division Retirement 080.75184 37602 (5,494) 080 190 - Mid-Tex Gas Division Retirement 080.75184 38000 (325) 080 190 - Mid-Tex Gas Division Retirement 080.75188 37601 (1,673) 080 190 - Mid-Tex Gas Division Retirement 080.75188 38000 (7,489) 080 190 - Mid-Tex Gas Division Retirement 080.75190 37601 (1,064) 080 190 - Mid-Tex Gas Division Retirement 080.75190 37602 (2,167) 080 190 - Mid-Tex Gas Division Retirement 080.75190 38000 (12,115) 080 190 - Mid-Tex Gas Division Retirement 080.75195 37800 (23,823) 080 190 - Mid-Tex Gas Division Retirement 080.75196 37601 (16,743) 080 190 - Mid-Tex Gas Division Retirement 080.75196 37800 (28,109) 080 190 - Mid-Tex Gas Division Retirement 080.75198 37601 (2,432) 080 190 - Mid-Tex Gas Division Retirement 080.75198 37800 (64,297) 080 190 - Mid-Tex Gas Division Retirement 080.75198 38000 (88) 080 190 - Mid-Tex Gas Division Retirement 080.75199 37602 (2,174) 080 190 - Mid-Tex Gas Division Retirement 080.75199 37800 (44,626) 080 190 - Mid-Tex Gas Division Retirement 080.75200 37601 (1,181) 080 190 - Mid-Tex Gas Division Retirement 080.75200 37602 (18) 080 190 - Mid-Tex Gas Division Retirement 080.75200 37800 (2,056) 080 190 - Mid-Tex Gas Division Retirement 080.75202 37601 (222) 080 190 - Mid-Tex Gas Division Retirement 080.75202 37602 (79) 080 190 - Mid-Tex Gas Division Retirement 080.75202 37800 (13,085) 080 190 - Mid-Tex Gas Division Retirement 080.75203 37601 (12) 080 190 - Mid-Tex Gas Division Retirement 080.75203 37602 (21) 080 190 - Mid-Tex Gas Division Retirement 080.75203 37800 (72,572) 080 190 - Mid-Tex Gas Division Retirement 080.75210 37601 (14) 080 190 - Mid-Tex Gas Division Retirement 080.75210 37800 (37,967) 080 190 - Mid-Tex Gas Division Retirement 080.75211 37601 (2,579) 080 190 - Mid-Tex Gas Division Retirement 080.75211 37602 (11) 080 190 - Mid-Tex Gas Division Retirement 080.75211 37800 (64,754) 080 190 - Mid-Tex Gas Division Retirement 080.75214 37601 (161) 080 190 - Mid-Tex Gas Division Retirement 080.75214 37602 (622) 080 190 - Mid-Tex Gas Division Retirement 080.75214 37800 (23,889) 080 190 - Mid-Tex Gas Division Retirement 080.75215 37601 (22,731) 080 190 - Mid-Tex Gas Division Retirement 080.75215 37800 (32,529) 080 190 - Mid-Tex Gas Division Retirement 080.75216 37601 (26) 080 190 - Mid-Tex Gas Division Retirement 080.75216 37800 (31,308) 080 190 - Mid-Tex Gas Division Retirement 080.75219 37601 (1,287) 080 190 - Mid-Tex Gas Division Retirement 080.75219 37602 (248) 080 190 - Mid-Tex Gas Division Retirement 080.75219 38000 (28,859) 080 190 - Mid-Tex Gas Division Retirement 080.75221 37601 (3,296) 080 190 - Mid-Tex Gas Division Retirement 080.75221 37800 6,509 080 190 - Mid-Tex Gas Division Retirement 080.75227 37602 (1,268) 080 190 - Mid-Tex Gas Division Retirement 080.75227 37800 (77,896) 080 190 - Mid-Tex Gas Division Retirement 080.75228 37601 (999,066) 080 190 - Mid-Tex Gas Division Retirement 080.75228 37602 (701) 080 190 - Mid-Tex Gas Division Retirement 080.75228 38000 (840) 080 190 - Mid-Tex Gas Division Retirement 080.75236 37601 (17) 080 190 - Mid-Tex Gas Division Retirement 080.75236 37602 (1,359) 080 190 - Mid-Tex Gas Division Retirement 080.75236 37800 (4,064) 080 190 - Mid-Tex Gas Division Retirement 080.75239 37601 (6) 080 190 - Mid-Tex Gas Division Retirement 080.75239 37602 (319) 080 190 - Mid-Tex Gas Division Retirement 080.75239 37800 (14,286) 080 190 - Mid-Tex Gas Division Retirement 080.75243 37800 (36,787) 080 190 - Mid-Tex Gas Division Retirement 080.75251 37602 (127) 080 190 - Mid-Tex Gas Division Retirement 080.75251 37800 176,087 080 190 - Mid-Tex Gas Division Retirement 080.75256 37602 (130) 080 190 - Mid-Tex Gas Division Retirement 080.75256 37800 (46,362) 080 190 - Mid-Tex Gas Division Retirement 080.75259 37601 (54,539) 080 190 - Mid-Tex Gas Division Retirement 080.75259 38000 (6,992) 080 190 - Mid-Tex Gas Division Retirement 080.75260 37601 (1,130) 080 190 - Mid-Tex Gas Division Retirement 080.75261 37601 (16,888) 080 190 - Mid-Tex Gas Division Retirement 080.75261 37602 (416) 080 190 - Mid-Tex Gas Division Retirement 080.75261 38000 (17,141) 080 190 - Mid-Tex Gas Division Retirement 080.75263 37602 (3,844) 080 190 - Mid-Tex Gas Division Retirement 080.75263 38000 (485) 080 190 - Mid-Tex Gas Division Retirement 080.75276 37601 (40,087) 080 190 - Mid-Tex Gas Division Retirement 080.75276 38000 (3,588) 080 190 - Mid-Tex Gas Division Retirement 080.75278 37601 (4,287) 080 190 - Mid-Tex Gas Division Retirement 080.75278 37602 (1,041) 080 190 - Mid-Tex Gas Division Retirement 080.75278 38000 (6,139) 080 190 - Mid-Tex Gas Division Retirement 080.75279 37601 (1,816) 080 190 - Mid-Tex Gas Division Retirement 080.75279 38000 (11,662) 080 190 - Mid-Tex Gas Division Retirement 080.75280 37601 (19,889) 080 190 - Mid-Tex Gas Division Retirement 080.75280 38000 (3,097) 080 190 - Mid-Tex Gas Division Retirement 080.75281 37601 (5,357) 080 190 - Mid-Tex Gas Division Retirement 080.75281 37602 (464) 080 190 - Mid-Tex Gas Division Retirement 080.75281 38000 (11,244) 080 190 - Mid-Tex Gas Division Retirement 080.75287 38000 (828) 080 190 - Mid-Tex Gas Division Retirement 080.75301 37601 (3,236) 080 190 - Mid-Tex Gas Division Retirement 080.75301 37602 (16,603) 080 190 - Mid-Tex Gas Division Retirement 080.75313 37602 (3,317) 080 190 - Mid-Tex Gas Division Retirement 080.75314 37601 (2,790) 080 190 - Mid-Tex Gas Division Retirement 080.75314 37602 (698) 080 190 - Mid-Tex Gas Division Retirement 080.75314 38000 (601) 080 190 - Mid-Tex Gas Division Retirement 080.75315 37601 (7) 080 190 - Mid-Tex Gas Division Retirement 080.75315 37602 (754) 080 190 - Mid-Tex Gas Division Retirement 080.75315 37800 (6,442) 080 190 - Mid-Tex Gas Division Retirement 080.75321 37601 (1,272) 080 190 - Mid-Tex Gas Division Retirement 080.75321 37602 (7) 080 190 - Mid-Tex Gas Division Retirement 080.75321 37800 (68,114) 080 190 - Mid-Tex Gas Division Retirement 080.75327 37601 (559) 080 190 - Mid-Tex Gas Division Retirement 080.75327 37800 (52,918) 080 190 - Mid-Tex Gas Division Retirement 080.75328 37601 (1,968) 080 190 - Mid-Tex Gas Division Retirement 080.75341 37601 (2,128) 080 190 - Mid-Tex Gas Division Retirement 080.75341 37602 (2,076) 080 190 - Mid-Tex Gas Division Retirement 080.75341 38000 (19,949) 080 190 - Mid-Tex Gas Division Retirement 080.75342 37601 (2,455) 080 190 - Mid-Tex Gas Division Retirement 080.75342 37602 (967) 080 190 - Mid-Tex Gas Division Retirement 080.75342 37800 (9,581) 080 190 - Mid-Tex Gas Division Retirement 080.75342 38000 (2,575) 080 190 - Mid-Tex Gas Division Retirement 080.75343 37601 (1,168) 080 190 - Mid-Tex Gas Division Retirement 080.75343 38000 (6,341) 080 190 - Mid-Tex Gas Division Retirement 080.75354 37601 (998) 080 190 - Mid-Tex Gas Division Retirement 080.75354 37602 (12) 080 190 - Mid-Tex Gas Division Retirement 080.75354 38000 (6,603) MTX Retirements by FERC Page 16 of 30 562 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.75356 37601 (1,899) 080 190 - Mid-Tex Gas Division Retirement 080.75356 38000 (15,099) 080 190 - Mid-Tex Gas Division Retirement 080.75360 37602 (1,032) 080 190 - Mid-Tex Gas Division Retirement 080.75367 37601 (47) 080 190 - Mid-Tex Gas Division Retirement 080.75367 37602 (292) 080 190 - Mid-Tex Gas Division Retirement 080.75367 37800 (4,954) 080 190 - Mid-Tex Gas Division Retirement 080.75368 37601 (1,652) 080 190 - Mid-Tex Gas Division Retirement 080.75368 37602 (14,323) 080 190 - Mid-Tex Gas Division Retirement 080.75368 38000 (4,535) 080 190 - Mid-Tex Gas Division Retirement 080.75379 37601 (1,470) 080 190 - Mid-Tex Gas Division Retirement 080.75379 37602 (1,342) 080 190 - Mid-Tex Gas Division Retirement 080.75379 38000 (7,963) 080 190 - Mid-Tex Gas Division Retirement 080.75380 37601 (8) 080 190 - Mid-Tex Gas Division Retirement 080.75380 37602 (1,255) 080 190 - Mid-Tex Gas Division Retirement 080.75381 37601 (51) 080 190 - Mid-Tex Gas Division Retirement 080.75381 37602 (1,194) 080 190 - Mid-Tex Gas Division Retirement 080.75381 37800 (15,356) 080 190 - Mid-Tex Gas Division Retirement 080.75383 37601 (19,098) 080 190 - Mid-Tex Gas Division Retirement 080.75383 37602 (23) 080 190 - Mid-Tex Gas Division Retirement 080.75383 37800 (12,071) 080 190 - Mid-Tex Gas Division Retirement 080.75384 37602 (629) 080 190 - Mid-Tex Gas Division Retirement 080.75392 37600 (94,426) 080 190 - Mid-Tex Gas Division Retirement 080.75398 37602 (30,770) 080 190 - Mid-Tex Gas Division Retirement 080.75398 38000 (12,965) 080 190 - Mid-Tex Gas Division Retirement 080.75399 37601 (5) 080 190 - Mid-Tex Gas Division Retirement 080.75399 37602 (6,373) 080 190 - Mid-Tex Gas Division Retirement 080.75399 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.75400 37601 (22,453) 080 190 - Mid-Tex Gas Division Retirement 080.75400 38000 (15,678) 080 190 - Mid-Tex Gas Division Retirement 080.75402 37601 (3,156) 080 190 - Mid-Tex Gas Division Retirement 080.75402 38000 (15,513) 080 190 - Mid-Tex Gas Division Retirement 080.75404 37601 (2,702) 080 190 - Mid-Tex Gas Division Retirement 080.75404 37602 (186) 080 190 - Mid-Tex Gas Division Retirement 080.75404 38000 (11,245) 080 190 - Mid-Tex Gas Division Retirement 080.75408 37601 (774) 080 190 - Mid-Tex Gas Division Retirement 080.75408 37602 (5,619) 080 190 - Mid-Tex Gas Division Retirement 080.75408 38000 (855) 080 190 - Mid-Tex Gas Division Retirement 080.75409 37601 (2,686) 080 190 - Mid-Tex Gas Division Retirement 080.75409 37602 (1,447) 080 190 - Mid-Tex Gas Division Retirement 080.75409 38000 (15,735) 080 190 - Mid-Tex Gas Division Retirement 080.75411 37601 (53,736) 080 190 - Mid-Tex Gas Division Retirement 080.75411 37602 (3,704) 080 190 - Mid-Tex Gas Division Retirement 080.75411 38000 (4,993) 080 190 - Mid-Tex Gas Division Retirement 080.75413 37601 (2,140) 080 190 - Mid-Tex Gas Division Retirement 080.75413 37602 (2,975) 080 190 - Mid-Tex Gas Division Retirement 080.75413 38000 (19,131) 080 190 - Mid-Tex Gas Division Retirement 080.75421 37602 (5,920) 080 190 - Mid-Tex Gas Division Retirement 080.75440 37602 (389) 080 190 - Mid-Tex Gas Division Retirement 080.75447 37800 (2,138) 080 190 - Mid-Tex Gas Division Retirement 080.75454 37601 (1,494) 080 190 - Mid-Tex Gas Division Retirement 080.75459 37601 (3,904) 080 190 - Mid-Tex Gas Division Retirement 080.75459 37602 (2,284) 080 190 - Mid-Tex Gas Division Retirement 080.75459 38000 (5,237) 080 190 - Mid-Tex Gas Division Retirement 080.75461 38000 (2,152) 080 190 - Mid-Tex Gas Division Retirement 080.75464 37601 (14) 080 190 - Mid-Tex Gas Division Retirement 080.75464 37800 (81,305) 080 190 - Mid-Tex Gas Division Retirement 080.75465 37602 (10) 080 190 - Mid-Tex Gas Division Retirement 080.75465 37800 (38,128) 080 190 - Mid-Tex Gas Division Retirement 080.75466 37601 (24) 080 190 - Mid-Tex Gas Division Retirement 080.75466 37602 (180) 080 190 - Mid-Tex Gas Division Retirement 080.75466 37800 (22,320) 080 190 - Mid-Tex Gas Division Retirement 080.75473 37602 (5,628) 080 190 - Mid-Tex Gas Division Retirement 080.75473 38000 (422) 080 190 - Mid-Tex Gas Division Retirement 080.75485 37601 (55) 080 190 - Mid-Tex Gas Division Retirement 080.75485 37602 (99) 080 190 - Mid-Tex Gas Division Retirement 080.75485 37800 (703) 080 190 - Mid-Tex Gas Division Retirement 080.75486 37601 (2,024) 080 190 - Mid-Tex Gas Division Retirement 080.75486 38000 (59) 080 190 - Mid-Tex Gas Division Retirement 080.75488 37601 (1,332) 080 190 - Mid-Tex Gas Division Retirement 080.75488 38000 (1,412) 080 190 - Mid-Tex Gas Division Retirement 080.75489 37601 (23) 080 190 - Mid-Tex Gas Division Retirement 080.75489 37602 (531) 080 190 - Mid-Tex Gas Division Retirement 080.75489 37800 (1,308) 080 190 - Mid-Tex Gas Division Retirement 080.75489 38000 (515) 080 190 - Mid-Tex Gas Division Retirement 080.75490 37601 (1,635) 080 190 - Mid-Tex Gas Division Retirement 080.75490 37602 (1,308) 080 190 - Mid-Tex Gas Division Retirement 080.75490 38000 (868) 080 190 - Mid-Tex Gas Division Retirement 080.75493 37601 (13) 080 190 - Mid-Tex Gas Division Retirement 080.75493 37602 (731) 080 190 - Mid-Tex Gas Division Retirement 080.75493 37800 (40,092) 080 190 - Mid-Tex Gas Division Retirement 080.75507 37601 (5,941) 080 190 - Mid-Tex Gas Division Retirement 080.75507 37602 (1,272) 080 190 - Mid-Tex Gas Division Retirement 080.75507 38000 (4,962) 080 190 - Mid-Tex Gas Division Retirement 080.75520 37600 (1,288) 080 190 - Mid-Tex Gas Division Retirement 080.75520 37601 (2,479) 080 190 - Mid-Tex Gas Division Retirement 080.75520 37602 (1,580) 080 190 - Mid-Tex Gas Division Retirement 080.75520 37800 (8,855) 080 190 - Mid-Tex Gas Division Retirement 080.75541 37601 (2,428) 080 190 - Mid-Tex Gas Division Retirement 080.75541 38000 (1,100) 080 190 - Mid-Tex Gas Division Retirement 080.75547 37601 (3,991) 080 190 - Mid-Tex Gas Division Retirement 080.75547 37602 (293) 080 190 - Mid-Tex Gas Division Retirement 080.75547 38000 (508) 080 190 - Mid-Tex Gas Division Retirement 080.75556 37601 (346) 080 190 - Mid-Tex Gas Division Retirement 080.75556 37602 (9) 080 190 - Mid-Tex Gas Division Retirement 080.75556 37800 (87,751) 080 190 - Mid-Tex Gas Division Retirement 080.75558 37601 (193) 080 190 - Mid-Tex Gas Division Retirement 080.75558 37800 (122,865) 080 190 - Mid-Tex Gas Division Retirement 080.75560 37601 (14,848) 080 190 - Mid-Tex Gas Division Retirement 080.75560 38000 (24,834) 080 190 - Mid-Tex Gas Division Retirement 080.75561 37601 (548) 080 190 - Mid-Tex Gas Division Retirement 080.75562 37601 (308) 080 190 - Mid-Tex Gas Division Retirement 080.75562 37602 (1,536) 080 190 - Mid-Tex Gas Division Retirement 080.75562 37800 (49,982) 080 190 - Mid-Tex Gas Division Retirement 080.75563 37601 (287) 080 190 - Mid-Tex Gas Division Retirement 080.75563 37602 (1,540) 080 190 - Mid-Tex Gas Division Retirement 080.75563 37800 (69,070) 080 190 - Mid-Tex Gas Division Retirement 080.75565 37601 (316) MTX Retirements by FERC Page 17 of 30 563 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.75565 37800 (38,966) 080 190 - Mid-Tex Gas Division Retirement 080.75567 38000 (32,501) 080 190 - Mid-Tex Gas Division Retirement 080.75571 37602 (4,742) 080 190 - Mid-Tex Gas Division Retirement 080.75571 38000 (7) 080 190 - Mid-Tex Gas Division Retirement 080.75574 37601 (53,283) 080 190 - Mid-Tex Gas Division Retirement 080.75575 37601 (5,871) 080 190 - Mid-Tex Gas Division Retirement 080.75575 37602 (5,699) 080 190 - Mid-Tex Gas Division Retirement 080.75575 37800 (12,725) 080 190 - Mid-Tex Gas Division Retirement 080.75575 38000 (7,672) 080 190 - Mid-Tex Gas Division Retirement 080.75578 37601 (8,588) 080 190 - Mid-Tex Gas Division Retirement 080.75578 37602 (39) 080 190 - Mid-Tex Gas Division Retirement 080.75578 38000 (1,946) 080 190 - Mid-Tex Gas Division Retirement 080.75584 37601 (1,597) 080 190 - Mid-Tex Gas Division Retirement 080.75584 37602 (406) 080 190 - Mid-Tex Gas Division Retirement 080.75587 37602 (473) 080 190 - Mid-Tex Gas Division Retirement 080.75598 37601 (333) 080 190 - Mid-Tex Gas Division Retirement 080.75598 37602 (126,986) 080 190 - Mid-Tex Gas Division Retirement 080.75598 38000 (132,999) 080 190 - Mid-Tex Gas Division Retirement 080.75601 37800 (17,818) 080 190 - Mid-Tex Gas Division Retirement 080.75605 38000 (86,260) 080 190 - Mid-Tex Gas Division Retirement 080.75606 37601 (476) 080 190 - Mid-Tex Gas Division Retirement 080.75606 37602 (256) 080 190 - Mid-Tex Gas Division Retirement 080.75606 38000 (4,313) 080 190 - Mid-Tex Gas Division Retirement 080.75608 37601 (6,981) 080 190 - Mid-Tex Gas Division Retirement 080.75608 37602 (5,292) 080 190 - Mid-Tex Gas Division Retirement 080.75608 38000 (4,804) 080 190 - Mid-Tex Gas Division Retirement 080.75618 37601 (36,302) 080 190 - Mid-Tex Gas Division Retirement 080.75618 37602 (112) 080 190 - Mid-Tex Gas Division Retirement 080.75618 38000 (22,848) 080 190 - Mid-Tex Gas Division Retirement 080.75623 37601 (276) 080 190 - Mid-Tex Gas Division Retirement 080.75624 37601 (2,694) 080 190 - Mid-Tex Gas Division Retirement 080.75624 38000 (985) 080 190 - Mid-Tex Gas Division Retirement 080.75625 37601 (48,575) 080 190 - Mid-Tex Gas Division Retirement 080.75625 38000 (11,184) 080 190 - Mid-Tex Gas Division Retirement 080.75628 37601 (2,593) 080 190 - Mid-Tex Gas Division Retirement 080.75628 38000 (300) 080 190 - Mid-Tex Gas Division Retirement 080.75642 38000 (286) 080 190 - Mid-Tex Gas Division Retirement 080.75647 37601 (79,835) 080 190 - Mid-Tex Gas Division Retirement 080.75647 37602 (6,008) 080 190 - Mid-Tex Gas Division Retirement 080.75648 37601 (10,936) 080 190 - Mid-Tex Gas Division Retirement 080.75648 37602 (4,683) 080 190 - Mid-Tex Gas Division Retirement 080.75648 38000 (5,557) 080 190 - Mid-Tex Gas Division Retirement 080.75649 37601 (294) 080 190 - Mid-Tex Gas Division Retirement 080.75649 37602 (810) 080 190 - Mid-Tex Gas Division Retirement 080.75649 38000 (410) 080 190 - Mid-Tex Gas Division Retirement 080.75650 37601 (32,657) 080 190 - Mid-Tex Gas Division Retirement 080.75650 37602 (595) 080 190 - Mid-Tex Gas Division Retirement 080.75650 38000 (4,312) 080 190 - Mid-Tex Gas Division Retirement 080.75651 37601 (9,132) 080 190 - Mid-Tex Gas Division Retirement 080.75651 37602 (1,637) 080 190 - Mid-Tex Gas Division Retirement 080.75651 38000 (18,884) 080 190 - Mid-Tex Gas Division Retirement 080.75653 37601 (3,488) 080 190 - Mid-Tex Gas Division Retirement 080.75653 37602 (11,260) 080 190 - Mid-Tex Gas Division Retirement 080.75653 38000 (7,215) 080 190 - Mid-Tex Gas Division Retirement 080.75656 37601 (2,928) 080 190 - Mid-Tex Gas Division Retirement 080.75656 38000 (356) 080 190 - Mid-Tex Gas Division Retirement 080.75657 37601 (338) 080 190 - Mid-Tex Gas Division Retirement 080.75658 37601 (28,123) 080 190 - Mid-Tex Gas Division Retirement 080.75658 37602 (2,585) 080 190 - Mid-Tex Gas Division Retirement 080.75658 38000 (11,032) 080 190 - Mid-Tex Gas Division Retirement 080.75660 37602 (226) 080 190 - Mid-Tex Gas Division Retirement 080.75682 38000 (317) 080 190 - Mid-Tex Gas Division Retirement 080.75682 38500 (1,875) 080 190 - Mid-Tex Gas Division Retirement 080.75698 37601 (52,617) 080 190 - Mid-Tex Gas Division Retirement 080.75698 38000 (29) 080 190 - Mid-Tex Gas Division Retirement 080.75702 37602 (999) 080 190 - Mid-Tex Gas Division Retirement 080.75705 37601 (3,459) 080 190 - Mid-Tex Gas Division Retirement 080.75705 37602 (7,454) 080 190 - Mid-Tex Gas Division Retirement 080.75705 37800 (31,781) 080 190 - Mid-Tex Gas Division Retirement 080.75705 38000 (8,993) 080 190 - Mid-Tex Gas Division Retirement 080.75706 37601 (260) 080 190 - Mid-Tex Gas Division Retirement 080.75712 37601 (1,926) 080 190 - Mid-Tex Gas Division Retirement 080.75712 37602 (11,067) 080 190 - Mid-Tex Gas Division Retirement 080.75712 38000 (24,593) 080 190 - Mid-Tex Gas Division Retirement 080.75716 37601 (72) 080 190 - Mid-Tex Gas Division Retirement 080.75716 37602 (82) 080 190 - Mid-Tex Gas Division Retirement 080.75716 37800 (1,902) 080 190 - Mid-Tex Gas Division Retirement 080.75717 37601 (42) 080 190 - Mid-Tex Gas Division Retirement 080.75717 37602 (107) 080 190 - Mid-Tex Gas Division Retirement 080.75717 37800 (2,915) 080 190 - Mid-Tex Gas Division Retirement 080.75720 37602 (427) 080 190 - Mid-Tex Gas Division Retirement 080.75720 38000 (119) 080 190 - Mid-Tex Gas Division Retirement 080.75722 37601 (645) 080 190 - Mid-Tex Gas Division Retirement 080.75722 37602 (16) 080 190 - Mid-Tex Gas Division Retirement 080.75722 38000 (0) 080 190 - Mid-Tex Gas Division Retirement 080.75723 37601 (2,546) 080 190 - Mid-Tex Gas Division Retirement 080.75723 38000 (276) 080 190 - Mid-Tex Gas Division Retirement 080.75728 37601 (3,185) 080 190 - Mid-Tex Gas Division Retirement 080.75728 37602 (2,210) 080 190 - Mid-Tex Gas Division Retirement 080.75728 38000 (863) 080 190 - Mid-Tex Gas Division Retirement 080.75729 37601 (3,028) 080 190 - Mid-Tex Gas Division Retirement 080.75729 37602 (2,340) 080 190 - Mid-Tex Gas Division Retirement 080.75729 37800 (443) 080 190 - Mid-Tex Gas Division Retirement 080.75729 38000 (14,858) 080 190 - Mid-Tex Gas Division Retirement 080.75730 37601 (2,399) 080 190 - Mid-Tex Gas Division Retirement 080.75730 37602 (841) 080 190 - Mid-Tex Gas Division Retirement 080.75730 37800 (92,630) 080 190 - Mid-Tex Gas Division Retirement 080.75730 38000 (1,940) 080 190 - Mid-Tex Gas Division Retirement 080.75731 37601 (697) 080 190 - Mid-Tex Gas Division Retirement 080.75731 37602 (747) 080 190 - Mid-Tex Gas Division Retirement 080.75731 37800 (12,054) 080 190 - Mid-Tex Gas Division Retirement 080.75731 38000 (3,012) 080 190 - Mid-Tex Gas Division Retirement 080.75736 37601 (7,230) 080 190 - Mid-Tex Gas Division Retirement 080.75736 38000 (1,325) 080 190 - Mid-Tex Gas Division Retirement 080.75742 37601 (313) 080 190 - Mid-Tex Gas Division Retirement 080.75742 37602 (1,386) 080 190 - Mid-Tex Gas Division Retirement 080.75742 38000 (172) MTX Retirements by FERC Page 18 of 30 564 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.75750 37602 (270) 080 190 - Mid-Tex Gas Division Retirement 080.75750 37800 (5,303) 080 190 - Mid-Tex Gas Division Retirement 080.75752 37601 (6,881) 080 190 - Mid-Tex Gas Division Retirement 080.75752 38000 (922) 080 190 - Mid-Tex Gas Division Retirement 080.75753 37601 (5,117) 080 190 - Mid-Tex Gas Division Retirement 080.75753 37602 (658) 080 190 - Mid-Tex Gas Division Retirement 080.75753 38000 (5,436) 080 190 - Mid-Tex Gas Division Retirement 080.75754 37601 (1,452) 080 190 - Mid-Tex Gas Division Retirement 080.75754 37602 (2,774) 080 190 - Mid-Tex Gas Division Retirement 080.75754 38000 (9,684) 080 190 - Mid-Tex Gas Division Retirement 080.75758 37601 (1,542) 080 190 - Mid-Tex Gas Division Retirement 080.75758 37602 (22) 080 190 - Mid-Tex Gas Division Retirement 080.75758 38000 (6,309) 080 190 - Mid-Tex Gas Division Retirement 080.75769 37602 (3,316) 080 190 - Mid-Tex Gas Division Retirement 080.75769 38000 (794) 080 190 - Mid-Tex Gas Division Retirement 080.75770 37601 (953) 080 190 - Mid-Tex Gas Division Retirement 080.75770 37602 (370) 080 190 - Mid-Tex Gas Division Retirement 080.75770 38000 (3,382) 080 190 - Mid-Tex Gas Division Retirement 080.75777 37601 (1,587) 080 190 - Mid-Tex Gas Division Retirement 080.75777 38000 (3,998) 080 190 - Mid-Tex Gas Division Retirement 080.75780 37601 (5,075) 080 190 - Mid-Tex Gas Division Retirement 080.75780 37602 (209,175) 080 190 - Mid-Tex Gas Division Retirement 080.75780 37800 (11,398) 080 190 - Mid-Tex Gas Division Retirement 080.75780 38000 (16,073) 080 190 - Mid-Tex Gas Division Retirement 080.75782 37601 (256) 080 190 - Mid-Tex Gas Division Retirement 080.75782 37602 (324) 080 190 - Mid-Tex Gas Division Retirement 080.75782 38000 (6,751) 080 190 - Mid-Tex Gas Division Retirement 080.75784 37800 (677) 080 190 - Mid-Tex Gas Division Retirement 080.75786 37601 (10,757) 080 190 - Mid-Tex Gas Division Retirement 080.75786 37602 (9,651) 080 190 - Mid-Tex Gas Division Retirement 080.75786 38000 (434) 080 190 - Mid-Tex Gas Division Retirement 080.75788 37601 (528) 080 190 - Mid-Tex Gas Division Retirement 080.75788 37602 (1,218) 080 190 - Mid-Tex Gas Division Retirement 080.75788 38000 (4,108) 080 190 - Mid-Tex Gas Division Retirement 080.75795 37601 (438) 080 190 - Mid-Tex Gas Division Retirement 080.75797 37602 (9,477) 080 190 - Mid-Tex Gas Division Retirement 080.75799 37601 (1,873) 080 190 - Mid-Tex Gas Division Retirement 080.75799 37602 (1,291) 080 190 - Mid-Tex Gas Division Retirement 080.75799 38000 (558) 080 190 - Mid-Tex Gas Division Retirement 080.75806 37602 (50,245) 080 190 - Mid-Tex Gas Division Retirement 080.75806 38000 (68,618) 080 190 - Mid-Tex Gas Division Retirement 080.75807 37601 (1,442) 080 190 - Mid-Tex Gas Division Retirement 080.75807 37602 (67) 080 190 - Mid-Tex Gas Division Retirement 080.75807 38000 (12,614) 080 190 - Mid-Tex Gas Division Retirement 080.75808 37602 (387) 080 190 - Mid-Tex Gas Division Retirement 080.75815 37602 (583) 080 190 - Mid-Tex Gas Division Retirement 080.75818 37602 (7,017) 080 190 - Mid-Tex Gas Division Retirement 080.75821 37601 (1,652) 080 190 - Mid-Tex Gas Division Retirement 080.75821 38000 (128) 080 190 - Mid-Tex Gas Division Retirement 080.75825 37601 (85) 080 190 - Mid-Tex Gas Division Retirement 080.75825 37800 (11,615) 080 190 - Mid-Tex Gas Division Retirement 080.75825 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.75827 37602 (14) 080 190 - Mid-Tex Gas Division Retirement 080.75827 37800 (204) 080 190 - Mid-Tex Gas Division Retirement 080.75828 37601 (1,737) 080 190 - Mid-Tex Gas Division Retirement 080.75828 37800 (18,367) 080 190 - Mid-Tex Gas Division Retirement 080.75828 38000 (538) 080 190 - Mid-Tex Gas Division Retirement 080.75830 37601 (211) 080 190 - Mid-Tex Gas Division Retirement 080.75830 37800 (818) 080 190 - Mid-Tex Gas Division Retirement 080.75830 38000 (153) 080 190 - Mid-Tex Gas Division Retirement 080.75845 37601 (25) 080 190 - Mid-Tex Gas Division Retirement 080.75845 37602 (58,358) 080 190 - Mid-Tex Gas Division Retirement 080.75845 37800 (510) 080 190 - Mid-Tex Gas Division Retirement 080.75847 37602 (257) 080 190 - Mid-Tex Gas Division Retirement 080.75854 37601 (9,452) 080 190 - Mid-Tex Gas Division Retirement 080.75858 37601 (11,194) 080 190 - Mid-Tex Gas Division Retirement 080.75858 37602 (87) 080 190 - Mid-Tex Gas Division Retirement 080.75860 37601 (573) 080 190 - Mid-Tex Gas Division Retirement 080.75860 37602 (35,992) 080 190 - Mid-Tex Gas Division Retirement 080.75860 38000 (725) 080 190 - Mid-Tex Gas Division Retirement 080.75863 37601 (14,914) 080 190 - Mid-Tex Gas Division Retirement 080.75863 37602 (470) 080 190 - Mid-Tex Gas Division Retirement 080.75863 38000 (33,365) 080 190 - Mid-Tex Gas Division Retirement 080.75867 37601 (125) 080 190 - Mid-Tex Gas Division Retirement 080.75867 37602 (460) 080 190 - Mid-Tex Gas Division Retirement 080.75870 37601 (313) 080 190 - Mid-Tex Gas Division Retirement 080.75870 38000 (363) 080 190 - Mid-Tex Gas Division Retirement 080.75883 37601 (306) 080 190 - Mid-Tex Gas Division Retirement 080.75883 37800 (174) 080 190 - Mid-Tex Gas Division Retirement 080.75894 37602 (1,197) 080 190 - Mid-Tex Gas Division Retirement 080.75907 37601 (546) 080 190 - Mid-Tex Gas Division Retirement 080.75907 37602 (514) 080 190 - Mid-Tex Gas Division Retirement 080.75908 37602 (2) 080 190 - Mid-Tex Gas Division Retirement 080.75911 37602 (2,523) 080 190 - Mid-Tex Gas Division Retirement 080.75919 37601 (98,315) 080 190 - Mid-Tex Gas Division Retirement 080.75919 37602 (5,532) 080 190 - Mid-Tex Gas Division Retirement 080.75919 38000 (10,886) 080 190 - Mid-Tex Gas Division Retirement 080.75921 37602 (89) 080 190 - Mid-Tex Gas Division Retirement 080.75921 38000 (701) 080 190 - Mid-Tex Gas Division Retirement 080.75922 37601 (1,098) 080 190 - Mid-Tex Gas Division Retirement 080.75924 37601 (347) 080 190 - Mid-Tex Gas Division Retirement 080.75924 37602 (8) 080 190 - Mid-Tex Gas Division Retirement 080.75924 37800 (2,128) 080 190 - Mid-Tex Gas Division Retirement 080.75924 38000 (1,389) 080 190 - Mid-Tex Gas Division Retirement 080.75925 37601 (413) 080 190 - Mid-Tex Gas Division Retirement 080.75925 37602 (30) 080 190 - Mid-Tex Gas Division Retirement 080.75925 37800 (10,406) 080 190 - Mid-Tex Gas Division Retirement 080.75925 38000 (220) 080 190 - Mid-Tex Gas Division Retirement 080.75954 37602 (558) 080 190 - Mid-Tex Gas Division Retirement 080.75966 37601 (19,027) 080 190 - Mid-Tex Gas Division Retirement 080.75966 37602 (1,101) 080 190 - Mid-Tex Gas Division Retirement 080.75966 38000 (16,789) 080 190 - Mid-Tex Gas Division Retirement 080.75967 37602 (8,167) 080 190 - Mid-Tex Gas Division Retirement 080.75967 38000 (65,761) 080 190 - Mid-Tex Gas Division Retirement 080.75968 37602 (107,607) 080 190 - Mid-Tex Gas Division Retirement 080.75968 38000 (6,439) 080 190 - Mid-Tex Gas Division Retirement 080.75975 37601 (1,184) MTX Retirements by FERC Page 19 of 30 565 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.75975 37602 (1,834) 080 190 - Mid-Tex Gas Division Retirement 080.75975 37800 (181) 080 190 - Mid-Tex Gas Division Retirement 080.75975 38000 (843) 080 190 - Mid-Tex Gas Division Retirement 080.75976 37601 (229) 080 190 - Mid-Tex Gas Division Retirement 080.75976 37602 (19,225) 080 190 - Mid-Tex Gas Division Retirement 080.75976 38000 (280) 080 190 - Mid-Tex Gas Division Retirement 080.75987 38000 (31) 080 190 - Mid-Tex Gas Division Retirement 080.75994 37601 (1,457) 080 190 - Mid-Tex Gas Division Retirement 080.75994 37602 (157) 080 190 - Mid-Tex Gas Division Retirement 080.75994 37800 (59,331) 080 190 - Mid-Tex Gas Division Retirement 080.75994 38000 (2,597) 080 190 - Mid-Tex Gas Division Retirement 080.76004 37601 (46) 080 190 - Mid-Tex Gas Division Retirement 080.76004 37602 (491) 080 190 - Mid-Tex Gas Division Retirement 080.76012 37601 (4,126) 080 190 - Mid-Tex Gas Division Retirement 080.76012 37602 (404) 080 190 - Mid-Tex Gas Division Retirement 080.76012 38000 (10,679) 080 190 - Mid-Tex Gas Division Retirement 080.76018 37602 (7,479) 080 190 - Mid-Tex Gas Division Retirement 080.76024 37601 (9) 080 190 - Mid-Tex Gas Division Retirement 080.76024 37602 (1,052) 080 190 - Mid-Tex Gas Division Retirement 080.76024 37800 (44,788) 080 190 - Mid-Tex Gas Division Retirement 080.76025 37601 (19) 080 190 - Mid-Tex Gas Division Retirement 080.76025 37602 (74) 080 190 - Mid-Tex Gas Division Retirement 080.76025 37800 (36,667) 080 190 - Mid-Tex Gas Division Retirement 080.76026 37601 (517) 080 190 - Mid-Tex Gas Division Retirement 080.76026 37602 (655) 080 190 - Mid-Tex Gas Division Retirement 080.76026 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.76027 37601 (1,610) 080 190 - Mid-Tex Gas Division Retirement 080.76027 38000 (109) 080 190 - Mid-Tex Gas Division Retirement 080.76033 37601 (1,971) 080 190 - Mid-Tex Gas Division Retirement 080.76039 37601 (10,619) 080 190 - Mid-Tex Gas Division Retirement 080.76039 37602 (60) 080 190 - Mid-Tex Gas Division Retirement 080.76039 38000 (26,314) 080 190 - Mid-Tex Gas Division Retirement 080.76047 37601 (382) 080 190 - Mid-Tex Gas Division Retirement 080.76047 37602 (101) 080 190 - Mid-Tex Gas Division Retirement 080.76052 37601 (485) 080 190 - Mid-Tex Gas Division Retirement 080.76052 37602 (192) 080 190 - Mid-Tex Gas Division Retirement 080.76055 37601 (75) 080 190 - Mid-Tex Gas Division Retirement 080.76055 37602 (16) 080 190 - Mid-Tex Gas Division Retirement 080.76085 37601 (2,810) 080 190 - Mid-Tex Gas Division Retirement 080.76085 38000 (9,270) 080 190 - Mid-Tex Gas Division Retirement 080.76087 37601 (88) 080 190 - Mid-Tex Gas Division Retirement 080.76087 37800 (13,081) 080 190 - Mid-Tex Gas Division Retirement 080.76087 38000 (557) 080 190 - Mid-Tex Gas Division Retirement 080.76088 37601 (2,842) 080 190 - Mid-Tex Gas Division Retirement 080.76088 37602 (437) 080 190 - Mid-Tex Gas Division Retirement 080.76088 37800 (37,720) 080 190 - Mid-Tex Gas Division Retirement 080.76089 37601 (294) 080 190 - Mid-Tex Gas Division Retirement 080.76089 37602 (818) 080 190 - Mid-Tex Gas Division Retirement 080.76089 37800 (23,763) 080 190 - Mid-Tex Gas Division Retirement 080.76089 38000 (102) 080 190 - Mid-Tex Gas Division Retirement 080.76093 37601 (12,612) 080 190 - Mid-Tex Gas Division Retirement 080.76093 38000 (22,968) 080 190 - Mid-Tex Gas Division Retirement 080.76098 37601 (79,894) 080 190 - Mid-Tex Gas Division Retirement 080.76098 38000 (12,487) 080 190 - Mid-Tex Gas Division Retirement 080.76101 37601 (4) 080 190 - Mid-Tex Gas Division Retirement 080.76101 37602 (533) 080 190 - Mid-Tex Gas Division Retirement 080.76101 37800 (34,871) 080 190 - Mid-Tex Gas Division Retirement 080.76107 37601 (30,125) 080 190 - Mid-Tex Gas Division Retirement 080.76107 37602 (9,711) 080 190 - Mid-Tex Gas Division Retirement 080.76107 37800 (8,993) 080 190 - Mid-Tex Gas Division Retirement 080.76110 37601 (20,406) 080 190 - Mid-Tex Gas Division Retirement 080.76111 37601 (767) 080 190 - Mid-Tex Gas Division Retirement 080.76111 37602 (1,248) 080 190 - Mid-Tex Gas Division Retirement 080.76111 38000 (14,396) 080 190 - Mid-Tex Gas Division Retirement 080.76120 37601 (28) 080 190 - Mid-Tex Gas Division Retirement 080.76120 37602 (32) 080 190 - Mid-Tex Gas Division Retirement 080.76120 37800 (232,464) 080 190 - Mid-Tex Gas Division Retirement 080.76121 37601 (289) 080 190 - Mid-Tex Gas Division Retirement 080.76121 38000 (6,388) 080 190 - Mid-Tex Gas Division Retirement 080.76122 37601 (956) 080 190 - Mid-Tex Gas Division Retirement 080.76122 37602 (343) 080 190 - Mid-Tex Gas Division Retirement 080.76122 38000 (1,798) 080 190 - Mid-Tex Gas Division Retirement 080.76127 37601 (2,058) 080 190 - Mid-Tex Gas Division Retirement 080.76127 37602 (19,256) 080 190 - Mid-Tex Gas Division Retirement 080.76138 37601 (28) 080 190 - Mid-Tex Gas Division Retirement 080.76138 37602 (22) 080 190 - Mid-Tex Gas Division Retirement 080.76138 37800 (444) 080 190 - Mid-Tex Gas Division Retirement 080.76140 37601 (109) 080 190 - Mid-Tex Gas Division Retirement 080.76140 37800 (34,538) 080 190 - Mid-Tex Gas Division Retirement 080.76141 37601 (1,650) 080 190 - Mid-Tex Gas Division Retirement 080.76141 37602 (62) 080 190 - Mid-Tex Gas Division Retirement 080.76141 38000 (1,258) 080 190 - Mid-Tex Gas Division Retirement 080.76143 37601 (19,504) 080 190 - Mid-Tex Gas Division Retirement 080.76143 38000 (5,342) 080 190 - Mid-Tex Gas Division Retirement 080.76145 37601 (14,332) 080 190 - Mid-Tex Gas Division Retirement 080.76149 37601 (14,009) 080 190 - Mid-Tex Gas Division Retirement 080.76149 37602 (2,764) 080 190 - Mid-Tex Gas Division Retirement 080.76149 38000 (31,321) 080 190 - Mid-Tex Gas Division Retirement 080.76150 37601 (1,086) 080 190 - Mid-Tex Gas Division Retirement 080.76150 37602 (44,714) 080 190 - Mid-Tex Gas Division Retirement 080.76150 38000 (2,148) 080 190 - Mid-Tex Gas Division Retirement 080.76151 37601 (519) 080 190 - Mid-Tex Gas Division Retirement 080.76151 37602 (8,907) 080 190 - Mid-Tex Gas Division Retirement 080.76151 38000 (4,655) 080 190 - Mid-Tex Gas Division Retirement 080.76155 37601 (460) 080 190 - Mid-Tex Gas Division Retirement 080.76160 37800 (9,247) 080 190 - Mid-Tex Gas Division Retirement 080.76161 37602 (24,730) 080 190 - Mid-Tex Gas Division Retirement 080.76161 38000 (1,731) 080 190 - Mid-Tex Gas Division Retirement 080.76166 37601 (333) 080 190 - Mid-Tex Gas Division Retirement 080.76166 38000 (17,848) 080 190 - Mid-Tex Gas Division Retirement 080.76182 37602 (176) 080 190 - Mid-Tex Gas Division Retirement 080.76182 38000 (477) 080 190 - Mid-Tex Gas Division Retirement 080.76189 37602 (152) 080 190 - Mid-Tex Gas Division Retirement 080.76192 37601 (672) 080 190 - Mid-Tex Gas Division Retirement 080.76192 37800 (2,704) 080 190 - Mid-Tex Gas Division Retirement 080.76192 38000 (1,195) 080 190 - Mid-Tex Gas Division Retirement 080.76198 37601 (1,671) MTX Retirements by FERC Page 20 of 30 566 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.76198 37602 (2,335) 080 190 - Mid-Tex Gas Division Retirement 080.76198 38000 (17,206) 080 190 - Mid-Tex Gas Division Retirement 080.76199 37601 (1,290) 080 190 - Mid-Tex Gas Division Retirement 080.76199 37602 (1,896) 080 190 - Mid-Tex Gas Division Retirement 080.76199 38000 (17,929) 080 190 - Mid-Tex Gas Division Retirement 080.76200 37601 (3,853) 080 190 - Mid-Tex Gas Division Retirement 080.76200 37602 (568) 080 190 - Mid-Tex Gas Division Retirement 080.76200 38000 (17,500) 080 190 - Mid-Tex Gas Division Retirement 080.76201 37601 (4,195) 080 190 - Mid-Tex Gas Division Retirement 080.76201 37602 (1,388) 080 190 - Mid-Tex Gas Division Retirement 080.76201 38000 (14,787) 080 190 - Mid-Tex Gas Division Retirement 080.76202 37601 (2,706) 080 190 - Mid-Tex Gas Division Retirement 080.76202 37602 (1,159) 080 190 - Mid-Tex Gas Division Retirement 080.76202 38000 (23,939) 080 190 - Mid-Tex Gas Division Retirement 080.76205 37601 (1,237) 080 190 - Mid-Tex Gas Division Retirement 080.76205 37602 (413) 080 190 - Mid-Tex Gas Division Retirement 080.76205 38000 (15,546) 080 190 - Mid-Tex Gas Division Retirement 080.76217 37601 (3,362) 080 190 - Mid-Tex Gas Division Retirement 080.76217 37602 (3,627) 080 190 - Mid-Tex Gas Division Retirement 080.76217 38000 (995) 080 190 - Mid-Tex Gas Division Retirement 080.76225 37601 (243) 080 190 - Mid-Tex Gas Division Retirement 080.76225 37602 (779) 080 190 - Mid-Tex Gas Division Retirement 080.76248 37800 (687) 080 190 - Mid-Tex Gas Division Retirement 080.76250 37601 (11,568) 080 190 - Mid-Tex Gas Division Retirement 080.76250 37602 (43) 080 190 - Mid-Tex Gas Division Retirement 080.76250 38000 (23,720) 080 190 - Mid-Tex Gas Division Retirement 080.76256 37601 (36,973) 080 190 - Mid-Tex Gas Division Retirement 080.76256 37602 (19) 080 190 - Mid-Tex Gas Division Retirement 080.76256 38000 (5,353) 080 190 - Mid-Tex Gas Division Retirement 080.76259 37601 (5,506) 080 190 - Mid-Tex Gas Division Retirement 080.76259 38000 (3,652) 080 190 - Mid-Tex Gas Division Retirement 080.76260 37601 (2,934) 080 190 - Mid-Tex Gas Division Retirement 080.76260 37602 (2,225) 080 190 - Mid-Tex Gas Division Retirement 080.76260 38000 (5,230) 080 190 - Mid-Tex Gas Division Retirement 080.76262 37601 (1,025) 080 190 - Mid-Tex Gas Division Retirement 080.76262 38000 (9,772) 080 190 - Mid-Tex Gas Division Retirement 080.76263 37601 (2,228) 080 190 - Mid-Tex Gas Division Retirement 080.76263 37602 (1,529) 080 190 - Mid-Tex Gas Division Retirement 080.76263 38000 (11,950) 080 190 - Mid-Tex Gas Division Retirement 080.76264 37601 (5,190) 080 190 - Mid-Tex Gas Division Retirement 080.76264 38000 (10,829) 080 190 - Mid-Tex Gas Division Retirement 080.76265 37601 (2,706) 080 190 - Mid-Tex Gas Division Retirement 080.76265 37602 (3,015) 080 190 - Mid-Tex Gas Division Retirement 080.76265 38000 (9,907) 080 190 - Mid-Tex Gas Division Retirement 080.76266 37601 (6,771) 080 190 - Mid-Tex Gas Division Retirement 080.76266 38000 (4,306) 080 190 - Mid-Tex Gas Division Retirement 080.76267 37601 (1,986) 080 190 - Mid-Tex Gas Division Retirement 080.76267 37602 (528) 080 190 - Mid-Tex Gas Division Retirement 080.76267 38000 (4,207) 080 190 - Mid-Tex Gas Division Retirement 080.76268 37602 (1,540) 080 190 - Mid-Tex Gas Division Retirement 080.76268 38000 (11,906) 080 190 - Mid-Tex Gas Division Retirement 080.76269 37602 (5,855) 080 190 - Mid-Tex Gas Division Retirement 080.76269 38000 (5,208) 080 190 - Mid-Tex Gas Division Retirement 080.76270 37601 (3,805) 080 190 - Mid-Tex Gas Division Retirement 080.76270 37602 (191) 080 190 - Mid-Tex Gas Division Retirement 080.76270 38000 (12,284) 080 190 - Mid-Tex Gas Division Retirement 080.76293 37601 (8,500) 080 190 - Mid-Tex Gas Division Retirement 080.76315 37601 (10,241) 080 190 - Mid-Tex Gas Division Retirement 080.76315 37602 (23) 080 190 - Mid-Tex Gas Division Retirement 080.76315 38000 (5,102) 080 190 - Mid-Tex Gas Division Retirement 080.76330 37602 (22,441) 080 190 - Mid-Tex Gas Division Retirement 080.76330 38000 (649) 080 190 - Mid-Tex Gas Division Retirement 080.76332 37602 (3,857) 080 190 - Mid-Tex Gas Division Retirement 080.76332 38000 (5,135) 080 190 - Mid-Tex Gas Division Retirement 080.76335 37602 (11,068) 080 190 - Mid-Tex Gas Division Retirement 080.76335 38000 (8,917) 080 190 - Mid-Tex Gas Division Retirement 080.76338 37601 (2,798) 080 190 - Mid-Tex Gas Division Retirement 080.76338 38000 (11,295) 080 190 - Mid-Tex Gas Division Retirement 080.76339 37601 (1,269) 080 190 - Mid-Tex Gas Division Retirement 080.76339 38000 (3,871) 080 190 - Mid-Tex Gas Division Retirement 080.76343 37602 (2,249) 080 190 - Mid-Tex Gas Division Retirement 080.76343 38000 (7,102) 080 190 - Mid-Tex Gas Division Retirement 080.76346 37602 (2,474) 080 190 - Mid-Tex Gas Division Retirement 080.76346 38000 (2,496) 080 190 - Mid-Tex Gas Division Retirement 080.76347 37602 (2,270) 080 190 - Mid-Tex Gas Division Retirement 080.76347 38000 (3,588) 080 190 - Mid-Tex Gas Division Retirement 080.76349 37602 (2,693) 080 190 - Mid-Tex Gas Division Retirement 080.76349 38000 (2,060) 080 190 - Mid-Tex Gas Division Retirement 080.76350 37602 (3,745) 080 190 - Mid-Tex Gas Division Retirement 080.76350 38000 (7,312) 080 190 - Mid-Tex Gas Division Retirement 080.76354 37601 (2,606) 080 190 - Mid-Tex Gas Division Retirement 080.76354 37602 (8,164) 080 190 - Mid-Tex Gas Division Retirement 080.76354 38000 (4,963) 080 190 - Mid-Tex Gas Division Retirement 080.76356 37601 (1,259) 080 190 - Mid-Tex Gas Division Retirement 080.76356 37602 (1,224) 080 190 - Mid-Tex Gas Division Retirement 080.76364 37602 (261) 080 190 - Mid-Tex Gas Division Retirement 080.76370 37601 (67) 080 190 - Mid-Tex Gas Division Retirement 080.76375 37601 (48) 080 190 - Mid-Tex Gas Division Retirement 080.76375 37602 (30) 080 190 - Mid-Tex Gas Division Retirement 080.76375 37800 (109,639) 080 190 - Mid-Tex Gas Division Retirement 080.76376 38000 (64,986) 080 190 - Mid-Tex Gas Division Retirement 080.76378 37601 (274) 080 190 - Mid-Tex Gas Division Retirement 080.76378 37602 (645) 080 190 - Mid-Tex Gas Division Retirement 080.76378 38000 (1,433) 080 190 - Mid-Tex Gas Division Retirement 080.76379 37601 (6,998) 080 190 - Mid-Tex Gas Division Retirement 080.76379 38000 (6,255) 080 190 - Mid-Tex Gas Division Retirement 080.76382 37601 (1,319) 080 190 - Mid-Tex Gas Division Retirement 080.76382 37602 (2,106) 080 190 - Mid-Tex Gas Division Retirement 080.76390 37601 (25,673) 080 190 - Mid-Tex Gas Division Retirement 080.76390 37602 (810) 080 190 - Mid-Tex Gas Division Retirement 080.76390 38000 (24,730) 080 190 - Mid-Tex Gas Division Retirement 080.76402 37601 (3,774) 080 190 - Mid-Tex Gas Division Retirement 080.76402 38000 (980) 080 190 - Mid-Tex Gas Division Retirement 080.76404 37601 (37) 080 190 - Mid-Tex Gas Division Retirement 080.76405 37602 (63) 080 190 - Mid-Tex Gas Division Retirement 080.76419 37601 (779) 080 190 - Mid-Tex Gas Division Retirement 080.76419 38000 (19,038) MTX Retirements by FERC Page 21 of 30 567 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.76420 37601 (4,489) 080 190 - Mid-Tex Gas Division Retirement 080.76420 38000 (6,404) 080 190 - Mid-Tex Gas Division Retirement 080.76421 37601 (799) 080 190 - Mid-Tex Gas Division Retirement 080.76421 38000 (13,454) 080 190 - Mid-Tex Gas Division Retirement 080.76422 37601 (1,821) 080 190 - Mid-Tex Gas Division Retirement 080.76422 37602 (24) 080 190 - Mid-Tex Gas Division Retirement 080.76422 38000 (2,909) 080 190 - Mid-Tex Gas Division Retirement 080.76425 37601 (136,700) 080 190 - Mid-Tex Gas Division Retirement 080.76425 37602 (81) 080 190 - Mid-Tex Gas Division Retirement 080.76425 38000 (5,035) 080 190 - Mid-Tex Gas Division Retirement 080.76426 37601 (1,620) 080 190 - Mid-Tex Gas Division Retirement 080.76426 38000 (6,603) 080 190 - Mid-Tex Gas Division Retirement 080.76428 37601 (426) 080 190 - Mid-Tex Gas Division Retirement 080.76428 38000 (3,125) 080 190 - Mid-Tex Gas Division Retirement 080.76429 37601 (1,063) 080 190 - Mid-Tex Gas Division Retirement 080.76429 38000 (2,837) 080 190 - Mid-Tex Gas Division Retirement 080.76431 37601 (2,788) 080 190 - Mid-Tex Gas Division Retirement 080.76431 37602 (5,059) 080 190 - Mid-Tex Gas Division Retirement 080.76431 38000 (8,846) 080 190 - Mid-Tex Gas Division Retirement 080.76434 37601 (22) 080 190 - Mid-Tex Gas Division Retirement 080.76434 37602 (18) 080 190 - Mid-Tex Gas Division Retirement 080.76434 37800 (30,804) 080 190 - Mid-Tex Gas Division Retirement 080.76440 37601 (351) 080 190 - Mid-Tex Gas Division Retirement 080.76440 37800 (83,600) 080 190 - Mid-Tex Gas Division Retirement 080.76451 37601 (7,985) 080 190 - Mid-Tex Gas Division Retirement 080.76451 37602 (50) 080 190 - Mid-Tex Gas Division Retirement 080.76451 38000 (8,433) 080 190 - Mid-Tex Gas Division Retirement 080.76458 37601 (46,122) 080 190 - Mid-Tex Gas Division Retirement 080.76461 37601 (3,816) 080 190 - Mid-Tex Gas Division Retirement 080.76461 37602 (1,222) 080 190 - Mid-Tex Gas Division Retirement 080.76461 38000 (1,838) 080 190 - Mid-Tex Gas Division Retirement 080.76468 37602 (5,150) 080 190 - Mid-Tex Gas Division Retirement 080.76468 38000 (187) 080 190 - Mid-Tex Gas Division Retirement 080.76473 37601 (7,878) 080 190 - Mid-Tex Gas Division Retirement 080.76473 37602 (1,118) 080 190 - Mid-Tex Gas Division Retirement 080.76473 37800 (2,558) 080 190 - Mid-Tex Gas Division Retirement 080.76478 37602 (1,255) 080 190 - Mid-Tex Gas Division Retirement 080.76481 37601 (105) 080 190 - Mid-Tex Gas Division Retirement 080.76481 38000 (509) 080 190 - Mid-Tex Gas Division Retirement 080.76483 37601 (813) 080 190 - Mid-Tex Gas Division Retirement 080.76483 38000 (20) 080 190 - Mid-Tex Gas Division Retirement 080.76490 37601 (538) 080 190 - Mid-Tex Gas Division Retirement 080.76491 37600 (35,202) 080 190 - Mid-Tex Gas Division Retirement 080.76496 37601 (604) 080 190 - Mid-Tex Gas Division Retirement 080.76496 38000 (1,345) 080 190 - Mid-Tex Gas Division Retirement 080.76504 37602 (13,225) 080 190 - Mid-Tex Gas Division Retirement 080.76504 38000 (303) 080 190 - Mid-Tex Gas Division Retirement 080.76508 37601 (8,125) 080 190 - Mid-Tex Gas Division Retirement 080.76508 37602 (1,987) 080 190 - Mid-Tex Gas Division Retirement 080.76508 38000 (29) 080 190 - Mid-Tex Gas Division Retirement 080.76509 37601 (1,243) 080 190 - Mid-Tex Gas Division Retirement 080.76509 38000 (4,900) 080 190 - Mid-Tex Gas Division Retirement 080.76510 37601 (8,279) 080 190 - Mid-Tex Gas Division Retirement 080.76510 37602 (5,545) 080 190 - Mid-Tex Gas Division Retirement 080.76510 38000 (4,004) 080 190 - Mid-Tex Gas Division Retirement 080.76511 37602 (43,028) 080 190 - Mid-Tex Gas Division Retirement 080.76513 37601 (4,376) 080 190 - Mid-Tex Gas Division Retirement 080.76513 37602 (1,211) 080 190 - Mid-Tex Gas Division Retirement 080.76513 38000 (2,706) 080 190 - Mid-Tex Gas Division Retirement 080.76514 37601 (8,661) 080 190 - Mid-Tex Gas Division Retirement 080.76514 37602 (8) 080 190 - Mid-Tex Gas Division Retirement 080.76515 37601 (1,980) 080 190 - Mid-Tex Gas Division Retirement 080.76515 37602 (9,610) 080 190 - Mid-Tex Gas Division Retirement 080.76515 38000 (1,168) 080 190 - Mid-Tex Gas Division Retirement 080.76516 37601 (1,382) 080 190 - Mid-Tex Gas Division Retirement 080.76516 38000 (4,318) 080 190 - Mid-Tex Gas Division Retirement 080.76521 37602 (3,163) 080 190 - Mid-Tex Gas Division Retirement 080.76522 37601 (1,192) 080 190 - Mid-Tex Gas Division Retirement 080.76522 37602 (806) 080 190 - Mid-Tex Gas Division Retirement 080.76522 38000 (3,661) 080 190 - Mid-Tex Gas Division Retirement 080.76523 37601 (58,419) 080 190 - Mid-Tex Gas Division Retirement 080.76535 37601 (401) 080 190 - Mid-Tex Gas Division Retirement 080.76535 37602 (40) 080 190 - Mid-Tex Gas Division Retirement 080.76538 37601 (1,597) 080 190 - Mid-Tex Gas Division Retirement 080.76538 37602 (2,960) 080 190 - Mid-Tex Gas Division Retirement 080.76556 37601 (1,479) 080 190 - Mid-Tex Gas Division Retirement 080.76556 37602 (2,091) 080 190 - Mid-Tex Gas Division Retirement 080.76557 37601 (759) 080 190 - Mid-Tex Gas Division Retirement 080.76557 37602 (2,615) 080 190 - Mid-Tex Gas Division Retirement 080.76557 37800 (41,130) 080 190 - Mid-Tex Gas Division Retirement 080.76557 38000 (3,100) 080 190 - Mid-Tex Gas Division Retirement 080.76571 37601 (702) 080 190 - Mid-Tex Gas Division Retirement 080.76571 37800 (119,310) 080 190 - Mid-Tex Gas Division Retirement 080.76575 37602 (2,457) 080 190 - Mid-Tex Gas Division Retirement 080.76575 37800 (165,944) 080 190 - Mid-Tex Gas Division Retirement 080.76580 37601 (226) 080 190 - Mid-Tex Gas Division Retirement 080.76580 37800 (10,835) 080 190 - Mid-Tex Gas Division Retirement 080.76582 37602 (449) 080 190 - Mid-Tex Gas Division Retirement 080.76582 38000 (152) 080 190 - Mid-Tex Gas Division Retirement 080.76587 37601 (21,910) 080 190 - Mid-Tex Gas Division Retirement 080.76587 37602 (254) 080 190 - Mid-Tex Gas Division Retirement 080.76590 37601 (118) 080 190 - Mid-Tex Gas Division Retirement 080.76590 37602 (2,039) 080 190 - Mid-Tex Gas Division Retirement 080.76590 38000 (1,119) 080 190 - Mid-Tex Gas Division Retirement 080.76591 37602 (38,673) 080 190 - Mid-Tex Gas Division Retirement 080.76598 37601 (376) 080 190 - Mid-Tex Gas Division Retirement 080.76598 37602 (693) 080 190 - Mid-Tex Gas Division Retirement 080.76628 37601 (2,127) 080 190 - Mid-Tex Gas Division Retirement 080.76628 37602 (254) 080 190 - Mid-Tex Gas Division Retirement 080.76628 38000 (3,960) 080 190 - Mid-Tex Gas Division Retirement 080.76633 37601 (696) 080 190 - Mid-Tex Gas Division Retirement 080.76638 37602 (32) 080 190 - Mid-Tex Gas Division Retirement 080.76638 37800 (58,553) 080 190 - Mid-Tex Gas Division Retirement 080.76644 37601 (159,678) 080 190 - Mid-Tex Gas Division Retirement 080.76644 37602 (79) 080 190 - Mid-Tex Gas Division Retirement 080.76644 38000 (15,374) 080 190 - Mid-Tex Gas Division Retirement 080.76650 37601 (3,775) MTX Retirements by FERC Page 22 of 30 568 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.76650 37602 (197) 080 190 - Mid-Tex Gas Division Retirement 080.76650 38000 (128) 080 190 - Mid-Tex Gas Division Retirement 080.76655 37601 (398) 080 190 - Mid-Tex Gas Division Retirement 080.76655 37602 (808) 080 190 - Mid-Tex Gas Division Retirement 080.76655 38000 (537) 080 190 - Mid-Tex Gas Division Retirement 080.76657 37601 (7,740) 080 190 - Mid-Tex Gas Division Retirement 080.76657 38000 (60,772) 080 190 - Mid-Tex Gas Division Retirement 080.76660 37601 (12,735) 080 190 - Mid-Tex Gas Division Retirement 080.76660 38000 (16,362) 080 190 - Mid-Tex Gas Division Retirement 080.76661 37601 (5,757) 080 190 - Mid-Tex Gas Division Retirement 080.76661 37602 (14,094) 080 190 - Mid-Tex Gas Division Retirement 080.76661 37800 (465) 080 190 - Mid-Tex Gas Division Retirement 080.76661 38000 (1,443) 080 190 - Mid-Tex Gas Division Retirement 080.76662 37601 (207) 080 190 - Mid-Tex Gas Division Retirement 080.76662 37602 (160) 080 190 - Mid-Tex Gas Division Retirement 080.76662 37800 (1,723) 080 190 - Mid-Tex Gas Division Retirement 080.76666 37601 (555) 080 190 - Mid-Tex Gas Division Retirement 080.76666 37602 (2,861) 080 190 - Mid-Tex Gas Division Retirement 080.76666 38000 (20,147) 080 190 - Mid-Tex Gas Division Retirement 080.76672 37601 (91) 080 190 - Mid-Tex Gas Division Retirement 080.76672 37602 (478) 080 190 - Mid-Tex Gas Division Retirement 080.76672 37800 (1,659) 080 190 - Mid-Tex Gas Division Retirement 080.76673 37602 (3,202) 080 190 - Mid-Tex Gas Division Retirement 080.76673 37800 (1,026) 080 190 - Mid-Tex Gas Division Retirement 080.76673 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.76680 37601 (307) 080 190 - Mid-Tex Gas Division Retirement 080.76680 37800 (2,923) 080 190 - Mid-Tex Gas Division Retirement 080.76681 37601 (327) 080 190 - Mid-Tex Gas Division Retirement 080.76681 37602 (655) 080 190 - Mid-Tex Gas Division Retirement 080.76681 37800 (1,257) 080 190 - Mid-Tex Gas Division Retirement 080.76682 37601 (13,759) 080 190 - Mid-Tex Gas Division Retirement 080.76682 37800 (208,654) 080 190 - Mid-Tex Gas Division Retirement 080.76682 38000 (6,928) 080 190 - Mid-Tex Gas Division Retirement 080.76684 37602 (688) 080 190 - Mid-Tex Gas Division Retirement 080.76684 37800 (1,324) 080 190 - Mid-Tex Gas Division Retirement 080.76684 38000 (680) 080 190 - Mid-Tex Gas Division Retirement 080.76686 37601 (3) 080 190 - Mid-Tex Gas Division Retirement 080.76686 37602 (1,686) 080 190 - Mid-Tex Gas Division Retirement 080.76686 37800 (2,012) 080 190 - Mid-Tex Gas Division Retirement 080.76695 37800 (971,515) 080 190 - Mid-Tex Gas Division Retirement 080.76697 37800 (161,320) 080 190 - Mid-Tex Gas Division Retirement 080.76711 37602 (377) 080 190 - Mid-Tex Gas Division Retirement 080.76713 37601 (866) 080 190 - Mid-Tex Gas Division Retirement 080.76713 37602 (8,347) 080 190 - Mid-Tex Gas Division Retirement 080.76713 38000 (1,245) 080 190 - Mid-Tex Gas Division Retirement 080.76714 38100 (12,703) 080 190 - Mid-Tex Gas Division Retirement 080.76724 37602 (721) 080 190 - Mid-Tex Gas Division Retirement 080.76726 37601 (172) 080 190 - Mid-Tex Gas Division Retirement 080.76726 37602 (782) 080 190 - Mid-Tex Gas Division Retirement 080.76731 37601 (19,281) 080 190 - Mid-Tex Gas Division Retirement 080.76731 38000 (46,823) 080 190 - Mid-Tex Gas Division Retirement 080.76733 37601 (418) 080 190 - Mid-Tex Gas Division Retirement 080.76733 37602 (1,375) 080 190 - Mid-Tex Gas Division Retirement 080.76738 37601 (245) 080 190 - Mid-Tex Gas Division Retirement 080.76738 37602 (149) 080 190 - Mid-Tex Gas Division Retirement 080.76738 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.76752 37601 (242) 080 190 - Mid-Tex Gas Division Retirement 080.76771 37601 (573) 080 190 - Mid-Tex Gas Division Retirement 080.76771 37602 (42) 080 190 - Mid-Tex Gas Division Retirement 080.76771 38000 (23) 080 190 - Mid-Tex Gas Division Retirement 080.76776 37602 (1,768) 080 190 - Mid-Tex Gas Division Retirement 080.76778 37602 (196) 080 190 - Mid-Tex Gas Division Retirement 080.76793 37601 (86) 080 190 - Mid-Tex Gas Division Retirement 080.76793 37602 (11) 080 190 - Mid-Tex Gas Division Retirement 080.76793 38000 (218) 080 190 - Mid-Tex Gas Division Retirement 080.76794 37601 (1,013) 080 190 - Mid-Tex Gas Division Retirement 080.76794 37602 (386) 080 190 - Mid-Tex Gas Division Retirement 080.76799 37601 (28,148) 080 190 - Mid-Tex Gas Division Retirement 080.76799 37602 (48,002) 080 190 - Mid-Tex Gas Division Retirement 080.76799 37800 (18,229) 080 190 - Mid-Tex Gas Division Retirement 080.76799 38000 (5,381) 080 190 - Mid-Tex Gas Division Retirement 080.76808 37602 (2,706) 080 190 - Mid-Tex Gas Division Retirement 080.76808 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.76814 37601 (12,297) 080 190 - Mid-Tex Gas Division Retirement 080.76814 38000 (5,591) 080 190 - Mid-Tex Gas Division Retirement 080.76819 37601 (1,011) 080 190 - Mid-Tex Gas Division Retirement 080.76819 38000 (8,086) 080 190 - Mid-Tex Gas Division Retirement 080.76823 37602 (4,746) 080 190 - Mid-Tex Gas Division Retirement 080.76823 38000 (358) 080 190 - Mid-Tex Gas Division Retirement 080.76826 37800 (485) 080 190 - Mid-Tex Gas Division Retirement 080.76831 37601 (49,459) 080 190 - Mid-Tex Gas Division Retirement 080.76831 37602 (6) 080 190 - Mid-Tex Gas Division Retirement 080.76833 37601 (158,456) 080 190 - Mid-Tex Gas Division Retirement 080.76835 37601 (7,638) 080 190 - Mid-Tex Gas Division Retirement 080.76835 37602 (946) 080 190 - Mid-Tex Gas Division Retirement 080.76835 38000 (8,153) 080 190 - Mid-Tex Gas Division Retirement 080.76841 37601 (1,808) 080 190 - Mid-Tex Gas Division Retirement 080.76841 38000 (8,073) 080 190 - Mid-Tex Gas Division Retirement 080.76842 37601 (1,339) 080 190 - Mid-Tex Gas Division Retirement 080.76842 37602 (718) 080 190 - Mid-Tex Gas Division Retirement 080.76842 38000 (8,945) 080 190 - Mid-Tex Gas Division Retirement 080.76846 37602 (28,552) 080 190 - Mid-Tex Gas Division Retirement 080.76848 37602 (684) 080 190 - Mid-Tex Gas Division Retirement 080.76858 37602 (12,537) 080 190 - Mid-Tex Gas Division Retirement 080.76862 37601 (2,176) 080 190 - Mid-Tex Gas Division Retirement 080.76864 37602 (18,698) 080 190 - Mid-Tex Gas Division Retirement 080.76864 38000 (6,394) 080 190 - Mid-Tex Gas Division Retirement 080.76867 37600 (5,644) 080 190 - Mid-Tex Gas Division Retirement 080.76873 38000 (13,160) 080 190 - Mid-Tex Gas Division Retirement 080.76888 37601 (150,831) 080 190 - Mid-Tex Gas Division Retirement 080.76888 37602 (243) 080 190 - Mid-Tex Gas Division Retirement 080.76888 38000 (1,038) 080 190 - Mid-Tex Gas Division Retirement 080.76889 37601 (5,575) 080 190 - Mid-Tex Gas Division Retirement 080.76889 38000 (15,899) 080 190 - Mid-Tex Gas Division Retirement 080.76890 37601 (18,344) 080 190 - Mid-Tex Gas Division Retirement 080.76890 38000 (15,789) 080 190 - Mid-Tex Gas Division Retirement 080.76891 38000 (17,889) MTX Retirements by FERC Page 23 of 30 569 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.76892 37601 (1,693) 080 190 - Mid-Tex Gas Division Retirement 080.76892 37602 (236) 080 190 - Mid-Tex Gas Division Retirement 080.76892 38000 (13,188) 080 190 - Mid-Tex Gas Division Retirement 080.76893 37601 (1,529) 080 190 - Mid-Tex Gas Division Retirement 080.76893 38000 (30,127) 080 190 - Mid-Tex Gas Division Retirement 080.76894 38000 (18,350) 080 190 - Mid-Tex Gas Division Retirement 080.76895 37601 (36,306) 080 190 - Mid-Tex Gas Division Retirement 080.76895 38000 (6,655) 080 190 - Mid-Tex Gas Division Retirement 080.76897 38000 (22,446) 080 190 - Mid-Tex Gas Division Retirement 080.76898 37601 (25,395) 080 190 - Mid-Tex Gas Division Retirement 080.76898 38000 (27,390) 080 190 - Mid-Tex Gas Division Retirement 080.76899 37601 (117,831) 080 190 - Mid-Tex Gas Division Retirement 080.76899 37602 (490) 080 190 - Mid-Tex Gas Division Retirement 080.76899 38000 (855) 080 190 - Mid-Tex Gas Division Retirement 080.76908 38000 (52,246) 080 190 - Mid-Tex Gas Division Retirement 080.76912 37601 (24,020) 080 190 - Mid-Tex Gas Division Retirement 080.76912 37602 (216,653) 080 190 - Mid-Tex Gas Division Retirement 080.76912 38000 (10,586) 080 190 - Mid-Tex Gas Division Retirement 080.76913 37601 (18,767) 080 190 - Mid-Tex Gas Division Retirement 080.76913 38000 (8,267) 080 190 - Mid-Tex Gas Division Retirement 080.76915 37601 (295,283) 080 190 - Mid-Tex Gas Division Retirement 080.76915 37602 (26,392) 080 190 - Mid-Tex Gas Division Retirement 080.76915 38000 (7,605) 080 190 - Mid-Tex Gas Division Retirement 080.76925 37601 (434) 080 190 - Mid-Tex Gas Division Retirement 080.76925 37602 (1,156) 080 190 - Mid-Tex Gas Division Retirement 080.76925 38000 (2,044) 080 190 - Mid-Tex Gas Division Retirement 080.76929 37601 (1,118) 080 190 - Mid-Tex Gas Division Retirement 080.76929 38000 (621) 080 190 - Mid-Tex Gas Division Retirement 080.76937 37601 (2,609) 080 190 - Mid-Tex Gas Division Retirement 080.76937 38000 (9,657) 080 190 - Mid-Tex Gas Division Retirement 080.76948 37602 (1,420) 080 190 - Mid-Tex Gas Division Retirement 080.76951 37601 (3,728) 080 190 - Mid-Tex Gas Division Retirement 080.76951 38000 (2,925) 080 190 - Mid-Tex Gas Division Retirement 080.76964 37602 (706) 080 190 - Mid-Tex Gas Division Retirement 080.76965 37601 (52,359) 080 190 - Mid-Tex Gas Division Retirement 080.76965 37602 (49) 080 190 - Mid-Tex Gas Division Retirement 080.76965 38000 (2,119) 080 190 - Mid-Tex Gas Division Retirement 080.76978 37601 (419) 080 190 - Mid-Tex Gas Division Retirement 080.76978 37602 (22) 080 190 - Mid-Tex Gas Division Retirement 080.76983 37601 (30,345) 080 190 - Mid-Tex Gas Division Retirement 080.76983 37602 (405) 080 190 - Mid-Tex Gas Division Retirement 080.76983 38000 (29) 080 190 - Mid-Tex Gas Division Retirement 080.76988 37601 (25) 080 190 - Mid-Tex Gas Division Retirement 080.76988 37602 (98) 080 190 - Mid-Tex Gas Division Retirement 080.76988 37800 (756) 080 190 - Mid-Tex Gas Division Retirement 080.76988 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.76989 37602 (81) 080 190 - Mid-Tex Gas Division Retirement 080.76989 38000 (576) 080 190 - Mid-Tex Gas Division Retirement 080.76992 37602 (3,828) 080 190 - Mid-Tex Gas Division Retirement 080.76993 37601 (2,588) 080 190 - Mid-Tex Gas Division Retirement 080.76993 37602 (705) 080 190 - Mid-Tex Gas Division Retirement 080.76993 38000 (454) 080 190 - Mid-Tex Gas Division Retirement 080.76998 37601 (42,140) 080 190 - Mid-Tex Gas Division Retirement 080.76998 38000 (13,540) 080 190 - Mid-Tex Gas Division Retirement 080.77000 37601 (641) 080 190 - Mid-Tex Gas Division Retirement 080.77000 38000 (1,226) 080 190 - Mid-Tex Gas Division Retirement 080.77012 37601 (2,551) 080 190 - Mid-Tex Gas Division Retirement 080.77012 37602 (10,154) 080 190 - Mid-Tex Gas Division Retirement 080.77012 38000 (36) 080 190 - Mid-Tex Gas Division Retirement 080.77013 37601 (943) 080 190 - Mid-Tex Gas Division Retirement 080.77013 38000 (2,370) 080 190 - Mid-Tex Gas Division Retirement 080.77026 37602 (6) 080 190 - Mid-Tex Gas Division Retirement 080.77031 37601 (1,275) 080 190 - Mid-Tex Gas Division Retirement 080.77031 37602 (1,456) 080 190 - Mid-Tex Gas Division Retirement 080.77031 38000 (6,805) 080 190 - Mid-Tex Gas Division Retirement 080.77038 37601 (501) 080 190 - Mid-Tex Gas Division Retirement 080.77038 37602 (1,983) 080 190 - Mid-Tex Gas Division Retirement 080.77038 38000 (14,050) 080 190 - Mid-Tex Gas Division Retirement 080.77039 37601 (2,110) 080 190 - Mid-Tex Gas Division Retirement 080.77039 37602 (440) 080 190 - Mid-Tex Gas Division Retirement 080.77039 38000 (1,803) 080 190 - Mid-Tex Gas Division Retirement 080.77041 37602 (12) 080 190 - Mid-Tex Gas Division Retirement 080.77042 37601 (11,164) 080 190 - Mid-Tex Gas Division Retirement 080.77043 37601 (6) 080 190 - Mid-Tex Gas Division Retirement 080.77043 37602 (189) 080 190 - Mid-Tex Gas Division Retirement 080.77043 37800 (770) 080 190 - Mid-Tex Gas Division Retirement 080.77046 37601 (228) 080 190 - Mid-Tex Gas Division Retirement 080.77046 37602 (1,815) 080 190 - Mid-Tex Gas Division Retirement 080.77046 38000 (6,555) 080 190 - Mid-Tex Gas Division Retirement 080.77048 37601 (3,050) 080 190 - Mid-Tex Gas Division Retirement 080.77048 38000 (6,670) 080 190 - Mid-Tex Gas Division Retirement 080.77049 37601 (4,758) 080 190 - Mid-Tex Gas Division Retirement 080.77049 38000 (12,199) 080 190 - Mid-Tex Gas Division Retirement 080.77051 37601 (112,822) 080 190 - Mid-Tex Gas Division Retirement 080.77051 37800 (13,534) 080 190 - Mid-Tex Gas Division Retirement 080.77054 37601 (1,277) 080 190 - Mid-Tex Gas Division Retirement 080.77054 37800 (24,551) 080 190 - Mid-Tex Gas Division Retirement 080.77055 37602 (1,743) 080 190 - Mid-Tex Gas Division Retirement 080.77055 38000 (1,590) 080 190 - Mid-Tex Gas Division Retirement 080.77057 37800 (11,661) 080 190 - Mid-Tex Gas Division Retirement 080.77058 37601 (5,646) 080 190 - Mid-Tex Gas Division Retirement 080.77058 37602 (50) 080 190 - Mid-Tex Gas Division Retirement 080.77058 37800 (837) 080 190 - Mid-Tex Gas Division Retirement 080.77062 37601 (43) 080 190 - Mid-Tex Gas Division Retirement 080.77062 37602 (6) 080 190 - Mid-Tex Gas Division Retirement 080.77062 37800 (27,195) 080 190 - Mid-Tex Gas Division Retirement 080.77064 37601 (52) 080 190 - Mid-Tex Gas Division Retirement 080.77064 37800 (45,983) 080 190 - Mid-Tex Gas Division Retirement 080.77069 37601 (965) 080 190 - Mid-Tex Gas Division Retirement 080.77073 37602 (149) 080 190 - Mid-Tex Gas Division Retirement 080.77073 37800 (95) 080 190 - Mid-Tex Gas Division Retirement 080.77078 37601 (2,559) 080 190 - Mid-Tex Gas Division Retirement 080.77078 38000 (2,594) 080 190 - Mid-Tex Gas Division Retirement 080.77080 37601 (343) 080 190 - Mid-Tex Gas Division Retirement 080.77080 38000 (121) 080 190 - Mid-Tex Gas Division Retirement 080.77086 37601 (729) 080 190 - Mid-Tex Gas Division Retirement 080.77086 37602 (51) MTX Retirements by FERC Page 24 of 30 570 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.77086 38000 (356) 080 190 - Mid-Tex Gas Division Retirement 080.77087 38000 (153) 080 190 - Mid-Tex Gas Division Retirement 080.77091 37601 (760) 080 190 - Mid-Tex Gas Division Retirement 080.77091 37602 (4,863) 080 190 - Mid-Tex Gas Division Retirement 080.77091 38000 (2,047) 080 190 - Mid-Tex Gas Division Retirement 080.77110 37601 (18) 080 190 - Mid-Tex Gas Division Retirement 080.77110 37800 (6,595) 080 190 - Mid-Tex Gas Division Retirement 080.77111 37601 (15,235) 080 190 - Mid-Tex Gas Division Retirement 080.77113 37601 (1,795) 080 190 - Mid-Tex Gas Division Retirement 080.77113 37602 (709) 080 190 - Mid-Tex Gas Division Retirement 080.77113 38000 (12,488) 080 190 - Mid-Tex Gas Division Retirement 080.77114 37601 (3,406) 080 190 - Mid-Tex Gas Division Retirement 080.77114 37602 (692) 080 190 - Mid-Tex Gas Division Retirement 080.77114 38000 (1,094) 080 190 - Mid-Tex Gas Division Retirement 080.77156 37602 (9,746) 080 190 - Mid-Tex Gas Division Retirement 080.77167 37601 (139,377) 080 190 - Mid-Tex Gas Division Retirement 080.77167 38000 (7,805) 080 190 - Mid-Tex Gas Division Retirement 080.77198 37601 (2,832) 080 190 - Mid-Tex Gas Division Retirement 080.77198 37602 (1,019) 080 190 - Mid-Tex Gas Division Retirement 080.77198 37800 (67,965) 080 190 - Mid-Tex Gas Division Retirement 080.77208 37601 (280) 080 190 - Mid-Tex Gas Division Retirement 080.77208 38000 (4,117) 080 190 - Mid-Tex Gas Division Retirement 080.77217 37601 (1,457) 080 190 - Mid-Tex Gas Division Retirement 080.77217 38000 (148) 080 190 - Mid-Tex Gas Division Retirement 080.77218 38000 (4,730) 080 190 - Mid-Tex Gas Division Retirement 080.77219 37601 (66) 080 190 - Mid-Tex Gas Division Retirement 080.77219 37602 (45) 080 190 - Mid-Tex Gas Division Retirement 080.77219 38000 (4,272) 080 190 - Mid-Tex Gas Division Retirement 080.77220 37601 (545) 080 190 - Mid-Tex Gas Division Retirement 080.77220 37602 (1,811) 080 190 - Mid-Tex Gas Division Retirement 080.77220 38000 (1,290) 080 190 - Mid-Tex Gas Division Retirement 080.77224 37601 (1,261) 080 190 - Mid-Tex Gas Division Retirement 080.77224 37602 (4,652) 080 190 - Mid-Tex Gas Division Retirement 080.77224 38000 (1,473) 080 190 - Mid-Tex Gas Division Retirement 080.77263 38000 (4,582) 080 190 - Mid-Tex Gas Division Retirement 080.77264 37601 (2,215) 080 190 - Mid-Tex Gas Division Retirement 080.77264 38000 (4,882) 080 190 - Mid-Tex Gas Division Retirement 080.77265 37601 (1,051) 080 190 - Mid-Tex Gas Division Retirement 080.77265 38000 (1,526) 080 190 - Mid-Tex Gas Division Retirement 080.77267 37601 (3,352) 080 190 - Mid-Tex Gas Division Retirement 080.77267 37602 (5,080) 080 190 - Mid-Tex Gas Division Retirement 080.77267 38000 (10) 080 190 - Mid-Tex Gas Division Retirement 080.77282 37601 (495) 080 190 - Mid-Tex Gas Division Retirement 080.77282 37602 (166) 080 190 - Mid-Tex Gas Division Retirement 080.77288 37601 (162) 080 190 - Mid-Tex Gas Division Retirement 080.77291 37601 (1,167) 080 190 - Mid-Tex Gas Division Retirement 080.77291 37602 (410) 080 190 - Mid-Tex Gas Division Retirement 080.77291 38000 (1,111) 080 190 - Mid-Tex Gas Division Retirement 080.77294 37602 (42,607) 080 190 - Mid-Tex Gas Division Retirement 080.77296 37602 (32,838) 080 190 - Mid-Tex Gas Division Retirement 080.77296 38000 (3) 080 190 - Mid-Tex Gas Division Retirement 080.77297 37601 (5,459) 080 190 - Mid-Tex Gas Division Retirement 080.77297 37602 (2,117) 080 190 - Mid-Tex Gas Division Retirement 080.77297 38000 (40) 080 190 - Mid-Tex Gas Division Retirement 080.77305 37601 (297,774) 080 190 - Mid-Tex Gas Division Retirement 080.77305 37602 (678) 080 190 - Mid-Tex Gas Division Retirement 080.77305 37800 (51,659) 080 190 - Mid-Tex Gas Division Retirement 080.77305 38000 (7,039) 080 190 - Mid-Tex Gas Division Retirement 080.77311 37601 (353) 080 190 - Mid-Tex Gas Division Retirement 080.77311 37602 (6,180) 080 190 - Mid-Tex Gas Division Retirement 080.77311 38000 (3,841) 080 190 - Mid-Tex Gas Division Retirement 080.77319 37602 (22,971) 080 190 - Mid-Tex Gas Division Retirement 080.77319 38000 (3,034) 080 190 - Mid-Tex Gas Division Retirement 080.77322 37601 (780) 080 190 - Mid-Tex Gas Division Retirement 080.77322 37602 (437) 080 190 - Mid-Tex Gas Division Retirement 080.77328 37601 (2,216) 080 190 - Mid-Tex Gas Division Retirement 080.77328 37602 (2,578) 080 190 - Mid-Tex Gas Division Retirement 080.77328 38000 (2,243) 080 190 - Mid-Tex Gas Division Retirement 080.77341 37601 (1,254) 080 190 - Mid-Tex Gas Division Retirement 080.77341 37602 (121) 080 190 - Mid-Tex Gas Division Retirement 080.77341 38000 (4,576) 080 190 - Mid-Tex Gas Division Retirement 080.77348 37602 (3,932) 080 190 - Mid-Tex Gas Division Retirement 080.77348 38000 (158) 080 190 - Mid-Tex Gas Division Retirement 080.77351 37602 (3,493) 080 190 - Mid-Tex Gas Division Retirement 080.77352 37800 (10,664) 080 190 - Mid-Tex Gas Division Retirement 080.77357 37601 (223) 080 190 - Mid-Tex Gas Division Retirement 080.77357 37602 (3,413) 080 190 - Mid-Tex Gas Division Retirement 080.77357 38000 (217) 080 190 - Mid-Tex Gas Division Retirement 080.77371 37601 (422) 080 190 - Mid-Tex Gas Division Retirement 080.77374 37602 (1,680) 080 190 - Mid-Tex Gas Division Retirement 080.77383 37601 (42,050) 080 190 - Mid-Tex Gas Division Retirement 080.77384 37601 (2,997) 080 190 - Mid-Tex Gas Division Retirement 080.77384 38000 (938) 080 190 - Mid-Tex Gas Division Retirement 080.77387 37602 (1,180) 080 190 - Mid-Tex Gas Division Retirement 080.77389 37602 (783) 080 190 - Mid-Tex Gas Division Retirement 080.77394 37601 (445) 080 190 - Mid-Tex Gas Division Retirement 080.77394 37602 (648) 080 190 - Mid-Tex Gas Division Retirement 080.77394 38000 (4,116) 080 190 - Mid-Tex Gas Division Retirement 080.77396 37601 (2,783) 080 190 - Mid-Tex Gas Division Retirement 080.77396 37800 (37,413) 080 190 - Mid-Tex Gas Division Retirement 080.77401 37601 (7,062) 080 190 - Mid-Tex Gas Division Retirement 080.77401 37602 (7,398) 080 190 - Mid-Tex Gas Division Retirement 080.77401 38000 (12,443) 080 190 - Mid-Tex Gas Division Retirement 080.77414 37601 (244,500) 080 190 - Mid-Tex Gas Division Retirement 080.77414 38000 (22,428) 080 190 - Mid-Tex Gas Division Retirement 080.77422 37601 (816) 080 190 - Mid-Tex Gas Division Retirement 080.77422 37602 (1,516) 080 190 - Mid-Tex Gas Division Retirement 080.77422 38000 (16,414) 080 190 - Mid-Tex Gas Division Retirement 080.77424 37601 (247) 080 190 - Mid-Tex Gas Division Retirement 080.77424 38000 (572) 080 190 - Mid-Tex Gas Division Retirement 080.77427 37601 (120) 080 190 - Mid-Tex Gas Division Retirement 080.77428 37601 (1,664) 080 190 - Mid-Tex Gas Division Retirement 080.77428 37602 (3,378) 080 190 - Mid-Tex Gas Division Retirement 080.77428 38000 (4,035) 080 190 - Mid-Tex Gas Division Retirement 080.77429 37601 (11,344) 080 190 - Mid-Tex Gas Division Retirement 080.77429 37602 (6,017) 080 190 - Mid-Tex Gas Division Retirement 080.77429 38000 (19,306) MTX Retirements by FERC Page 25 of 30 571 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.77430 37602 (26,398) 080 190 - Mid-Tex Gas Division Retirement 080.77430 38000 (251) 080 190 - Mid-Tex Gas Division Retirement 080.77432 37601 (25,715) 080 190 - Mid-Tex Gas Division Retirement 080.77432 37602 (939) 080 190 - Mid-Tex Gas Division Retirement 080.77432 38000 (8,663) 080 190 - Mid-Tex Gas Division Retirement 080.77434 37601 (1,066) 080 190 - Mid-Tex Gas Division Retirement 080.77434 37602 (693) 080 190 - Mid-Tex Gas Division Retirement 080.77434 38000 (9,588) 080 190 - Mid-Tex Gas Division Retirement 080.77435 37601 (28,259) 080 190 - Mid-Tex Gas Division Retirement 080.77435 37602 (2,711) 080 190 - Mid-Tex Gas Division Retirement 080.77435 38000 (1,636) 080 190 - Mid-Tex Gas Division Retirement 080.77441 37602 (387) 080 190 - Mid-Tex Gas Division Retirement 080.77445 38000 (5,254) 080 190 - Mid-Tex Gas Division Retirement 080.77448 37601 (19,709) 080 190 - Mid-Tex Gas Division Retirement 080.77448 37602 (396) 080 190 - Mid-Tex Gas Division Retirement 080.77448 38000 (5,136) 080 190 - Mid-Tex Gas Division Retirement 080.77452 37601 (76) 080 190 - Mid-Tex Gas Division Retirement 080.77452 38000 (163) 080 190 - Mid-Tex Gas Division Retirement 080.77456 37601 (293) 080 190 - Mid-Tex Gas Division Retirement 080.77456 38000 (862) 080 190 - Mid-Tex Gas Division Retirement 080.77459 37601 (977) 080 190 - Mid-Tex Gas Division Retirement 080.77459 38000 (2,579) 080 190 - Mid-Tex Gas Division Retirement 080.77461 37601 (202) 080 190 - Mid-Tex Gas Division Retirement 080.77461 37602 (1,325) 080 190 - Mid-Tex Gas Division Retirement 080.77461 37800 (827) 080 190 - Mid-Tex Gas Division Retirement 080.77461 38000 (549) 080 190 - Mid-Tex Gas Division Retirement 080.77463 37601 (179) 080 190 - Mid-Tex Gas Division Retirement 080.77474 37601 (168) 080 190 - Mid-Tex Gas Division Retirement 080.77505 38000 (6,389) 080 190 - Mid-Tex Gas Division Retirement 080.77506 37601 (42,063) 080 190 - Mid-Tex Gas Division Retirement 080.77506 37602 (50,254) 080 190 - Mid-Tex Gas Division Retirement 080.77506 38000 (13,475) 080 190 - Mid-Tex Gas Division Retirement 080.77517 37601 (302) 080 190 - Mid-Tex Gas Division Retirement 080.77517 37602 (2,353) 080 190 - Mid-Tex Gas Division Retirement 080.77517 38000 (28,512) 080 190 - Mid-Tex Gas Division Retirement 080.77519 37602 (11,094) 080 190 - Mid-Tex Gas Division Retirement 080.77519 38000 (10,687) 080 190 - Mid-Tex Gas Division Retirement 080.77520 37602 (10,545) 080 190 - Mid-Tex Gas Division Retirement 080.77520 38000 (12,795) 080 190 - Mid-Tex Gas Division Retirement 080.77521 37601 (478) 080 190 - Mid-Tex Gas Division Retirement 080.77521 37602 (4,521) 080 190 - Mid-Tex Gas Division Retirement 080.77521 37800 (646,051) 080 190 - Mid-Tex Gas Division Retirement 080.77521 38000 (8,755) 080 190 - Mid-Tex Gas Division Retirement 080.77532 37601 (142,016) 080 190 - Mid-Tex Gas Division Retirement 080.77532 38000 (1,040) 080 190 - Mid-Tex Gas Division Retirement 080.77533 37601 (58,579) 080 190 - Mid-Tex Gas Division Retirement 080.77533 38000 (4,119) 080 190 - Mid-Tex Gas Division Retirement 080.77545 37602 (2,147) 080 190 - Mid-Tex Gas Division Retirement 080.77545 38000 (6,575) 080 190 - Mid-Tex Gas Division Retirement 080.77547 38000 (41) 080 190 - Mid-Tex Gas Division Retirement 080.77548 37601 (37,135) 080 190 - Mid-Tex Gas Division Retirement 080.77548 37602 (852) 080 190 - Mid-Tex Gas Division Retirement 080.77548 37800 (108,307) 080 190 - Mid-Tex Gas Division Retirement 080.77552 37601 (1,117) 080 190 - Mid-Tex Gas Division Retirement 080.77552 38000 (15,968) 080 190 - Mid-Tex Gas Division Retirement 080.77570 38000 (49,370) 080 190 - Mid-Tex Gas Division Retirement 080.77577 37602 (188) 080 190 - Mid-Tex Gas Division Retirement 080.77578 39000 (8) 080 190 - Mid-Tex Gas Division Retirement 080.77594 37800 (428) 080 190 - Mid-Tex Gas Division Retirement 080.77595 38000 (707) 080 190 - Mid-Tex Gas Division Retirement 080.77596 37601 (180,964) 080 190 - Mid-Tex Gas Division Retirement 080.77596 37602 (156) 080 190 - Mid-Tex Gas Division Retirement 080.77596 38000 (3,814) 080 190 - Mid-Tex Gas Division Retirement 080.77598 37601 (5,219) 080 190 - Mid-Tex Gas Division Retirement 080.77598 37800 (251,305) 080 190 - Mid-Tex Gas Division Retirement 080.77598 38000 (2,061) 080 190 - Mid-Tex Gas Division Retirement 080.77615 37601 (3,062) 080 190 - Mid-Tex Gas Division Retirement 080.77616 37601 (10,030) 080 190 - Mid-Tex Gas Division Retirement 080.77616 37602 (479) 080 190 - Mid-Tex Gas Division Retirement 080.77616 37800 (18,121) 080 190 - Mid-Tex Gas Division Retirement 080.77616 38000 (11,299) 080 190 - Mid-Tex Gas Division Retirement 080.77634 37800 (16,591) 080 190 - Mid-Tex Gas Division Retirement 080.77637 37602 (797) 080 190 - Mid-Tex Gas Division Retirement 080.77648 37601 (5) 080 190 - Mid-Tex Gas Division Retirement 080.77648 37800 (5,739) 080 190 - Mid-Tex Gas Division Retirement 080.77670 37601 (2) 080 190 - Mid-Tex Gas Division Retirement 080.77670 37602 (3,346) 080 190 - Mid-Tex Gas Division Retirement 080.77670 37800 (542,809) 080 190 - Mid-Tex Gas Division Retirement 080.77670 38000 (4,784) 080 190 - Mid-Tex Gas Division Retirement 080.77673 37602 (6,960) 080 190 - Mid-Tex Gas Division Retirement 080.77674 37602 (6,476) 080 190 - Mid-Tex Gas Division Retirement 080.77674 37800 (12,393) 080 190 - Mid-Tex Gas Division Retirement 080.77674 38000 (220) 080 190 - Mid-Tex Gas Division Retirement 080.77675 37602 (1,400) 080 190 - Mid-Tex Gas Division Retirement 080.77675 38000 (5,602) 080 190 - Mid-Tex Gas Division Retirement 080.77693 37601 (23,216) 080 190 - Mid-Tex Gas Division Retirement 080.77708 37601 (22,294) 080 190 - Mid-Tex Gas Division Retirement 080.77708 38000 (1,020) 080 190 - Mid-Tex Gas Division Retirement 080.77710 37601 (158,170) 080 190 - Mid-Tex Gas Division Retirement 080.77710 37602 (108) 080 190 - Mid-Tex Gas Division Retirement 080.77710 38000 (2,746) 080 190 - Mid-Tex Gas Division Retirement 080.77714 37601 (1,097) 080 190 - Mid-Tex Gas Division Retirement 080.77714 37602 (262) 080 190 - Mid-Tex Gas Division Retirement 080.77714 38000 (4,007) 080 190 - Mid-Tex Gas Division Retirement 080.77715 37601 (44,415) 080 190 - Mid-Tex Gas Division Retirement 080.77715 37602 (437) 080 190 - Mid-Tex Gas Division Retirement 080.77715 38000 (2,867) 080 190 - Mid-Tex Gas Division Retirement 080.77716 37601 (131,072) 080 190 - Mid-Tex Gas Division Retirement 080.77716 37602 (7,187) 080 190 - Mid-Tex Gas Division Retirement 080.77716 38000 (5,450) 080 190 - Mid-Tex Gas Division Retirement 080.77717 37601 (852) 080 190 - Mid-Tex Gas Division Retirement 080.77717 37602 (5,091) 080 190 - Mid-Tex Gas Division Retirement 080.77717 38000 (7,121) 080 190 - Mid-Tex Gas Division Retirement 080.77721 37601 (593) 080 190 - Mid-Tex Gas Division Retirement 080.77721 37602 (3,984) 080 190 - Mid-Tex Gas Division Retirement 080.77721 38000 (13,983) 080 190 - Mid-Tex Gas Division Retirement 080.77724 37601 (283) MTX Retirements by FERC Page 26 of 30 572 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.77724 38000 (716) 080 190 - Mid-Tex Gas Division Retirement 080.77730 37601 (3,880) 080 190 - Mid-Tex Gas Division Retirement 080.77730 37602 (777) 080 190 - Mid-Tex Gas Division Retirement 080.77730 38000 (1,426) 080 190 - Mid-Tex Gas Division Retirement 080.77736 37602 (3,171) 080 190 - Mid-Tex Gas Division Retirement 080.77743 37602 (1,085) 080 190 - Mid-Tex Gas Division Retirement 080.77743 38000 (3,121) 080 190 - Mid-Tex Gas Division Retirement 080.77746 37601 (362) 080 190 - Mid-Tex Gas Division Retirement 080.77746 37602 (143) 080 190 - Mid-Tex Gas Division Retirement 080.77746 38000 (1,346) 080 190 - Mid-Tex Gas Division Retirement 080.77749 37602 (18,522) 080 190 - Mid-Tex Gas Division Retirement 080.77750 37601 (129,601) 080 190 - Mid-Tex Gas Division Retirement 080.77750 38000 (4,272) 080 190 - Mid-Tex Gas Division Retirement 080.77751 37601 (2,616) 080 190 - Mid-Tex Gas Division Retirement 080.77751 37602 (2,193) 080 190 - Mid-Tex Gas Division Retirement 080.77751 38000 (4,362) 080 190 - Mid-Tex Gas Division Retirement 080.77755 37601 (220,499) 080 190 - Mid-Tex Gas Division Retirement 080.77755 38000 (1,809) 080 190 - Mid-Tex Gas Division Retirement 080.77756 37601 (9) 080 190 - Mid-Tex Gas Division Retirement 080.77756 37800 (38,640) 080 190 - Mid-Tex Gas Division Retirement 080.77760 37602 (410) 080 190 - Mid-Tex Gas Division Retirement 080.77760 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.77764 37602 (6,243) 080 190 - Mid-Tex Gas Division Retirement 080.77764 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.77771 37602 (99) 080 190 - Mid-Tex Gas Division Retirement 080.77771 38000 (4,424) 080 190 - Mid-Tex Gas Division Retirement 080.77772 37800 (2,557) 080 190 - Mid-Tex Gas Division Retirement 080.77786 37601 (126) 080 190 - Mid-Tex Gas Division Retirement 080.77790 37601 (2,743) 080 190 - Mid-Tex Gas Division Retirement 080.77790 37602 (4,003) 080 190 - Mid-Tex Gas Division Retirement 080.77791 37601 (20,839) 080 190 - Mid-Tex Gas Division Retirement 080.77791 38000 (8,391) 080 190 - Mid-Tex Gas Division Retirement 080.77802 37602 (462) 080 190 - Mid-Tex Gas Division Retirement 080.77810 37601 (9,930) 080 190 - Mid-Tex Gas Division Retirement 080.77810 38000 (16,853) 080 190 - Mid-Tex Gas Division Retirement 080.77812 37601 (1,963) 080 190 - Mid-Tex Gas Division Retirement 080.77812 38000 (16,140) 080 190 - Mid-Tex Gas Division Retirement 080.77819 37601 (1,128) 080 190 - Mid-Tex Gas Division Retirement 080.77819 38000 (485) 080 190 - Mid-Tex Gas Division Retirement 080.77823 37601 (2,116) 080 190 - Mid-Tex Gas Division Retirement 080.77823 37602 (4,912) 080 190 - Mid-Tex Gas Division Retirement 080.77823 38000 (86) 080 190 - Mid-Tex Gas Division Retirement 080.77825 37601 (1,013) 080 190 - Mid-Tex Gas Division Retirement 080.77825 38000 (486) 080 190 - Mid-Tex Gas Division Retirement 080.77826 37601 (83,818) 080 190 - Mid-Tex Gas Division Retirement 080.77826 38000 (4,119) 080 190 - Mid-Tex Gas Division Retirement 080.77833 37602 (1,021) 080 190 - Mid-Tex Gas Division Retirement 080.77840 37601 (8,680) 080 190 - Mid-Tex Gas Division Retirement 080.77840 38000 (143) 080 190 - Mid-Tex Gas Division Retirement 080.77854 37601 (370) 080 190 - Mid-Tex Gas Division Retirement 080.77854 37602 (156) 080 190 - Mid-Tex Gas Division Retirement 080.77854 38000 (1,086) 080 190 - Mid-Tex Gas Division Retirement 080.77860 37601 (3,094) 080 190 - Mid-Tex Gas Division Retirement 080.77860 37602 (29) 080 190 - Mid-Tex Gas Division Retirement 080.77860 38000 (4) 080 190 - Mid-Tex Gas Division Retirement 080.77865 37601 (2,819) 080 190 - Mid-Tex Gas Division Retirement 080.77865 37602 (4) 080 190 - Mid-Tex Gas Division Retirement 080.77865 38000 (1,298) 080 190 - Mid-Tex Gas Division Retirement 080.77867 37601 (8) 080 190 - Mid-Tex Gas Division Retirement 080.77867 37602 (732) 080 190 - Mid-Tex Gas Division Retirement 080.77867 37800 (44,227) 080 190 - Mid-Tex Gas Division Retirement 080.77894 37601 (5) 080 190 - Mid-Tex Gas Division Retirement 080.77894 37800 (523) 080 190 - Mid-Tex Gas Division Retirement 080.77898 37601 (377) 080 190 - Mid-Tex Gas Division Retirement 080.77899 37601 (157) 080 190 - Mid-Tex Gas Division Retirement 080.77899 37602 (211) 080 190 - Mid-Tex Gas Division Retirement 080.77899 38000 (1,068) 080 190 - Mid-Tex Gas Division Retirement 080.77905 38000 (79) 080 190 - Mid-Tex Gas Division Retirement 080.77909 37601 (64) 080 190 - Mid-Tex Gas Division Retirement 080.77912 37601 (443) 080 190 - Mid-Tex Gas Division Retirement 080.77912 38000 (5,618) 080 190 - Mid-Tex Gas Division Retirement 080.77914 38000 (99) 080 190 - Mid-Tex Gas Division Retirement 080.77916 37601 (550) 080 190 - Mid-Tex Gas Division Retirement 080.77916 37602 (431) 080 190 - Mid-Tex Gas Division Retirement 080.77916 38000 (1,555) 080 190 - Mid-Tex Gas Division Retirement 080.77920 37601 (2,145) 080 190 - Mid-Tex Gas Division Retirement 080.77920 38000 (2,441) 080 190 - Mid-Tex Gas Division Retirement 080.77921 37602 (57) 080 190 - Mid-Tex Gas Division Retirement 080.77921 37800 (20,445) 080 190 - Mid-Tex Gas Division Retirement 080.77922 37800 (7,395) 080 190 - Mid-Tex Gas Division Retirement 080.77923 37601 (55) 080 190 - Mid-Tex Gas Division Retirement 080.77923 37800 (1,338) 080 190 - Mid-Tex Gas Division Retirement 080.77924 37601 (1,646) 080 190 - Mid-Tex Gas Division Retirement 080.77924 37800 (5,176) 080 190 - Mid-Tex Gas Division Retirement 080.77925 37601 (901) 080 190 - Mid-Tex Gas Division Retirement 080.77925 37800 (15,307) 080 190 - Mid-Tex Gas Division Retirement 080.77926 37601 (9,956) 080 190 - Mid-Tex Gas Division Retirement 080.77926 37800 (1,943) 080 190 - Mid-Tex Gas Division Retirement 080.77927 37601 (22) 080 190 - Mid-Tex Gas Division Retirement 080.77927 37800 (26,655) 080 190 - Mid-Tex Gas Division Retirement 080.77928 37800 (3,498) 080 190 - Mid-Tex Gas Division Retirement 080.77929 37800 (3,998) 080 190 - Mid-Tex Gas Division Retirement 080.77930 37601 (38) 080 190 - Mid-Tex Gas Division Retirement 080.77930 37800 (4,505) 080 190 - Mid-Tex Gas Division Retirement 080.77932 37800 1,558 080 190 - Mid-Tex Gas Division Retirement 080.77933 37602 (4) 080 190 - Mid-Tex Gas Division Retirement 080.77933 37800 (5,905) 080 190 - Mid-Tex Gas Division Retirement 080.77934 37602 (21) 080 190 - Mid-Tex Gas Division Retirement 080.77934 37800 (1,354) 080 190 - Mid-Tex Gas Division Retirement 080.77941 37601 (150) 080 190 - Mid-Tex Gas Division Retirement 080.77960 38000 (4,119) 080 190 - Mid-Tex Gas Division Retirement 080.77961 37602 (547) 080 190 - Mid-Tex Gas Division Retirement 080.77970 37601 (130) 080 190 - Mid-Tex Gas Division Retirement 080.77970 37602 (1,753) 080 190 - Mid-Tex Gas Division Retirement 080.77970 38000 (6,040) 080 190 - Mid-Tex Gas Division Retirement 080.77971 37601 (467) 080 190 - Mid-Tex Gas Division Retirement 080.77971 38000 (610) MTX Retirements by FERC Page 27 of 30 573 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.77972 37601 (170) 080 190 - Mid-Tex Gas Division Retirement 080.77972 37602 (2,426) 080 190 - Mid-Tex Gas Division Retirement 080.77972 38000 (1,311) 080 190 - Mid-Tex Gas Division Retirement 080.77985 37601 (12,262) 080 190 - Mid-Tex Gas Division Retirement 080.77985 38000 (6,407) 080 190 - Mid-Tex Gas Division Retirement 080.78001 37602 (1,766) 080 190 - Mid-Tex Gas Division Retirement 080.78014 37601 (47,580) 080 190 - Mid-Tex Gas Division Retirement 080.78014 37602 (7,568) 080 190 - Mid-Tex Gas Division Retirement 080.78014 38000 (2,136) 080 190 - Mid-Tex Gas Division Retirement 080.78030 37601 (1,026) 080 190 - Mid-Tex Gas Division Retirement 080.78030 37602 (345) 080 190 - Mid-Tex Gas Division Retirement 080.78030 38000 (73) 080 190 - Mid-Tex Gas Division Retirement 080.78049 38000 (294) 080 190 - Mid-Tex Gas Division Retirement 080.78064 37602 (5,354) 080 190 - Mid-Tex Gas Division Retirement 080.78064 38000 (6,834) 080 190 - Mid-Tex Gas Division Retirement 080.78075 37601 (83,141) 080 190 - Mid-Tex Gas Division Retirement 080.78075 37602 (30,166) 080 190 - Mid-Tex Gas Division Retirement 080.78075 38000 (375) 080 190 - Mid-Tex Gas Division Retirement 080.78081 37601 (297) 080 190 - Mid-Tex Gas Division Retirement 080.78081 38000 (649) 080 190 - Mid-Tex Gas Division Retirement 080.78092 37800 (7,837) 080 190 - Mid-Tex Gas Division Retirement 080.78093 37601 (459) 080 190 - Mid-Tex Gas Division Retirement 080.78097 37601 (20) 080 190 - Mid-Tex Gas Division Retirement 080.78097 37602 (14) 080 190 - Mid-Tex Gas Division Retirement 080.78097 37800 (2,101) 080 190 - Mid-Tex Gas Division Retirement 080.78104 37601 (842) 080 190 - Mid-Tex Gas Division Retirement 080.78104 37602 (412) 080 190 - Mid-Tex Gas Division Retirement 080.78105 37601 (5,988) 080 190 - Mid-Tex Gas Division Retirement 080.78105 37800 (57,298) 080 190 - Mid-Tex Gas Division Retirement 080.78107 39000 (2,060) 080 190 - Mid-Tex Gas Division Retirement 080.78109 37601 (79,018) 080 190 - Mid-Tex Gas Division Retirement 080.78109 38000 (3,204) 080 190 - Mid-Tex Gas Division Retirement 080.78113 37601 (395) 080 190 - Mid-Tex Gas Division Retirement 080.78125 37601 (39,547) 080 190 - Mid-Tex Gas Division Retirement 080.78133 37601 (16,294) 080 190 - Mid-Tex Gas Division Retirement 080.78133 37602 (10,403) 080 190 - Mid-Tex Gas Division Retirement 080.78133 38000 (4,379) 080 190 - Mid-Tex Gas Division Retirement 080.78145 37601 (208) 080 190 - Mid-Tex Gas Division Retirement 080.78145 38000 (173) 080 190 - Mid-Tex Gas Division Retirement 080.78149 37601 (880) 080 190 - Mid-Tex Gas Division Retirement 080.78169 37601 (337) 080 190 - Mid-Tex Gas Division Retirement 080.78169 38000 (2,044) 080 190 - Mid-Tex Gas Division Retirement 080.78172 37601 (6,190) 080 190 - Mid-Tex Gas Division Retirement 080.78172 37602 (8,260) 080 190 - Mid-Tex Gas Division Retirement 080.78172 38000 (1,575) 080 190 - Mid-Tex Gas Division Retirement 080.78173 37601 (404) 080 190 - Mid-Tex Gas Division Retirement 080.78173 37602 (363) 080 190 - Mid-Tex Gas Division Retirement 080.78173 38000 (1,064) 080 190 - Mid-Tex Gas Division Retirement 080.78184 37601 (748) 080 190 - Mid-Tex Gas Division Retirement 080.78184 37602 (6,911) 080 190 - Mid-Tex Gas Division Retirement 080.78184 37800 (8,747) 080 190 - Mid-Tex Gas Division Retirement 080.78184 38000 (1,262) 080 190 - Mid-Tex Gas Division Retirement 080.78189 37601 (11,421) 080 190 - Mid-Tex Gas Division Retirement 080.78189 37602 (761) 080 190 - Mid-Tex Gas Division Retirement 080.78189 38000 (6,538) 080 190 - Mid-Tex Gas Division Retirement 080.78193 37601 (8,530) 080 190 - Mid-Tex Gas Division Retirement 080.78193 37602 (54) 080 190 - Mid-Tex Gas Division Retirement 080.78193 38000 (1,469) 080 190 - Mid-Tex Gas Division Retirement 080.78194 37601 (7,432) 080 190 - Mid-Tex Gas Division Retirement 080.78194 37602 (10,624) 080 190 - Mid-Tex Gas Division Retirement 080.78194 38000 (3,575) 080 190 - Mid-Tex Gas Division Retirement 080.78226 38000 (1,543) 080 190 - Mid-Tex Gas Division Retirement 080.78229 37601 (287) 080 190 - Mid-Tex Gas Division Retirement 080.78229 38000 (200) 080 190 - Mid-Tex Gas Division Retirement 080.78230 37601 (1,923) 080 190 - Mid-Tex Gas Division Retirement 080.78230 37602 (935) 080 190 - Mid-Tex Gas Division Retirement 080.78230 37800 (1,174) 080 190 - Mid-Tex Gas Division Retirement 080.78230 38000 (3,431) 080 190 - Mid-Tex Gas Division Retirement 080.78233 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.78234 37602 (7,219) 080 190 - Mid-Tex Gas Division Retirement 080.78247 37602 (232) 080 190 - Mid-Tex Gas Division Retirement 080.78265 37601 (380) 080 190 - Mid-Tex Gas Division Retirement 080.78265 37800 (3,356) 080 190 - Mid-Tex Gas Division Retirement 080.78300 37601 (399) 080 190 - Mid-Tex Gas Division Retirement 080.78300 37602 (2,655) 080 190 - Mid-Tex Gas Division Retirement 080.78300 38000 (3,517) 080 190 - Mid-Tex Gas Division Retirement 080.78301 37602 (5,075) 080 190 - Mid-Tex Gas Division Retirement 080.78301 38000 (12,005) 080 190 - Mid-Tex Gas Division Retirement 080.78344 37601 (194) 080 190 - Mid-Tex Gas Division Retirement 080.78350 37601 (7,408) 080 190 - Mid-Tex Gas Division Retirement 080.78350 37602 (2,546) 080 190 - Mid-Tex Gas Division Retirement 080.78350 38000 (577) 080 190 - Mid-Tex Gas Division Retirement 080.78364 37602 (2,207) 080 190 - Mid-Tex Gas Division Retirement 080.78367 37602 (11,866) 080 190 - Mid-Tex Gas Division Retirement 080.78374 37601 (505) 080 190 - Mid-Tex Gas Division Retirement 080.78374 37602 (516) 080 190 - Mid-Tex Gas Division Retirement 080.78374 38000 (63) 080 190 - Mid-Tex Gas Division Retirement 080.78378 37601 (94) 080 190 - Mid-Tex Gas Division Retirement 080.78379 37602 (8,366) 080 190 - Mid-Tex Gas Division Retirement 080.78384 37602 (479) 080 190 - Mid-Tex Gas Division Retirement 080.78384 37800 (2,132) 080 190 - Mid-Tex Gas Division Retirement 080.78386 37602 (23,754) 080 190 - Mid-Tex Gas Division Retirement 080.78389 37601 (6,035) 080 190 - Mid-Tex Gas Division Retirement 080.78389 37602 (2,329) 080 190 - Mid-Tex Gas Division Retirement 080.78389 38000 (2,894) 080 190 - Mid-Tex Gas Division Retirement 080.78399 37602 (2,570) 080 190 - Mid-Tex Gas Division Retirement 080.78399 38000 (102) 080 190 - Mid-Tex Gas Division Retirement 080.78415 37602 (3,943) 080 190 - Mid-Tex Gas Division Retirement 080.78416 37601 (779) 080 190 - Mid-Tex Gas Division Retirement 080.78416 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.78422 37602 (1,138) 080 190 - Mid-Tex Gas Division Retirement 080.78429 37601 (1,418) 080 190 - Mid-Tex Gas Division Retirement 080.78429 37602 (108) 080 190 - Mid-Tex Gas Division Retirement 080.78456 37602 (20,583) 080 190 - Mid-Tex Gas Division Retirement 080.78472 37601 (571,446) 080 190 - Mid-Tex Gas Division Retirement 080.78490 37602 (21) 080 190 - Mid-Tex Gas Division Retirement 080.78506 37602 (1,949) MTX Retirements by FERC Page 28 of 30 574 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.78506 38000 (4,027) 080 190 - Mid-Tex Gas Division Retirement 080.78508 37601 (1,017) 080 190 - Mid-Tex Gas Division Retirement 080.78508 37602 (532) 080 190 - Mid-Tex Gas Division Retirement 080.78508 38000 (153) 080 190 - Mid-Tex Gas Division Retirement 080.78526 37601 (667) 080 190 - Mid-Tex Gas Division Retirement 080.78526 37602 (1,632) 080 190 - Mid-Tex Gas Division Retirement 080.78526 38000 (550) 080 190 - Mid-Tex Gas Division Retirement 080.78528 37601 (4,502) 080 190 - Mid-Tex Gas Division Retirement 080.78528 37602 (686) 080 190 - Mid-Tex Gas Division Retirement 080.78530 37601 (19,584) 080 190 - Mid-Tex Gas Division Retirement 080.78570 37601 (7,908) 080 190 - Mid-Tex Gas Division Retirement 080.78570 37602 (112) 080 190 - Mid-Tex Gas Division Retirement 080.78570 38000 (10,145) 080 190 - Mid-Tex Gas Division Retirement 080.78581 37602 (5,709) 080 190 - Mid-Tex Gas Division Retirement 080.78581 38000 (1,162) 080 190 - Mid-Tex Gas Division Retirement 080.78586 38000 (107) 080 190 - Mid-Tex Gas Division Retirement 080.78589 37601 (7,405) 080 190 - Mid-Tex Gas Division Retirement 080.78589 38000 (7,073) 080 190 - Mid-Tex Gas Division Retirement 080.78595 38000 (14) 080 190 - Mid-Tex Gas Division Retirement 080.78613 37601 (15,146) 080 190 - Mid-Tex Gas Division Retirement 080.78613 37602 (3,732) 080 190 - Mid-Tex Gas Division Retirement 080.78613 38000 (36) 080 190 - Mid-Tex Gas Division Retirement 080.78621 37601 (745) 080 190 - Mid-Tex Gas Division Retirement 080.78621 38000 (1,294) 080 190 - Mid-Tex Gas Division Retirement 080.78622 37601 (13,539) 080 190 - Mid-Tex Gas Division Retirement 080.78622 38000 (5,134) 080 190 - Mid-Tex Gas Division Retirement 080.78649 37601 (4,732) 080 190 - Mid-Tex Gas Division Retirement 080.78649 37602 (3,060) 080 190 - Mid-Tex Gas Division Retirement 080.78649 38000 (102) 080 190 - Mid-Tex Gas Division Retirement 080.78659 37601 (170,728) 080 190 - Mid-Tex Gas Division Retirement 080.78659 37602 (131) 080 190 - Mid-Tex Gas Division Retirement 080.78677 37601 (26,201) 080 190 - Mid-Tex Gas Division Retirement 080.78677 38000 (88) 080 190 - Mid-Tex Gas Division Retirement 080.78697 37601 (579) 080 190 - Mid-Tex Gas Division Retirement 080.78705 37601 (4,261) 080 190 - Mid-Tex Gas Division Retirement 080.78713 37601 (22,237) 080 190 - Mid-Tex Gas Division Retirement 080.78713 37602 (1,548) 080 190 - Mid-Tex Gas Division Retirement 080.78713 38000 (1,158) 080 190 - Mid-Tex Gas Division Retirement 080.78733 37602 (211) 080 190 - Mid-Tex Gas Division Retirement 080.78739 37602 (217) 080 190 - Mid-Tex Gas Division Retirement 080.78741 37800 (139,554) 080 190 - Mid-Tex Gas Division Retirement 080.78757 37601 (1,622) 080 190 - Mid-Tex Gas Division Retirement 080.78781 37800 (7,395) 080 190 - Mid-Tex Gas Division Retirement 080.78805 37602 (727) 080 190 - Mid-Tex Gas Division Retirement 080.78806 37601 (71) 080 190 - Mid-Tex Gas Division Retirement 080.78810 37602 (12) 080 190 - Mid-Tex Gas Division Retirement 080.78823 37602 (850) 080 190 - Mid-Tex Gas Division Retirement 080.78831 37601 (5,001) 080 190 - Mid-Tex Gas Division Retirement 080.78831 37602 (553) 080 190 - Mid-Tex Gas Division Retirement 080.78831 38000 (1,445) 080 190 - Mid-Tex Gas Division Retirement 080.78832 37601 (297) 080 190 - Mid-Tex Gas Division Retirement 080.78867 37601 (365) 080 190 - Mid-Tex Gas Division Retirement 080.78867 37602 (112) 080 190 - Mid-Tex Gas Division Retirement 080.78868 39000 (10,484) 080 190 - Mid-Tex Gas Division Retirement 080.78877 37601 (2,586) 080 190 - Mid-Tex Gas Division Retirement 080.78877 37602 (244) 080 190 - Mid-Tex Gas Division Retirement 080.78877 38000 (27,483) 080 190 - Mid-Tex Gas Division Retirement 080.78884 37602 (1,061) 080 190 - Mid-Tex Gas Division Retirement 080.78884 38000 (89) 080 190 - Mid-Tex Gas Division Retirement 080.78892 37601 (1,422) 080 190 - Mid-Tex Gas Division Retirement 080.78892 38000 (193) 080 190 - Mid-Tex Gas Division Retirement 080.78895 37600 (1,627) 080 190 - Mid-Tex Gas Division Retirement 080.78896 37800 (27,240) 080 190 - Mid-Tex Gas Division Retirement 080.78898 37601 (39) 080 190 - Mid-Tex Gas Division Retirement 080.78898 37602 (8) 080 190 - Mid-Tex Gas Division Retirement 080.78898 37800 (435) 080 190 - Mid-Tex Gas Division Retirement 080.78898 38000 (222) 080 190 - Mid-Tex Gas Division Retirement 080.78945 37602 (3,023) 080 190 - Mid-Tex Gas Division Retirement 080.78945 38000 (11,740) 080 190 - Mid-Tex Gas Division Retirement 080.78957 37601 (528) 080 190 - Mid-Tex Gas Division Retirement 080.78957 37602 (3,891) 080 190 - Mid-Tex Gas Division Retirement 080.78957 38000 (1,983) 080 190 - Mid-Tex Gas Division Retirement 080.78971 37601 (2,501) 080 190 - Mid-Tex Gas Division Retirement 080.78971 37602 (1,833) 080 190 - Mid-Tex Gas Division Retirement 080.78971 38000 (902) 080 190 - Mid-Tex Gas Division Retirement 080.78979 37601 (1,103) 080 190 - Mid-Tex Gas Division Retirement 080.78979 37602 (305) 080 190 - Mid-Tex Gas Division Retirement 080.78979 38000 (13,199) 080 190 - Mid-Tex Gas Division Retirement 080.78981 37601 (2,767) 080 190 - Mid-Tex Gas Division Retirement 080.78983 37601 (417) 080 190 - Mid-Tex Gas Division Retirement 080.78983 37602 (81) 080 190 - Mid-Tex Gas Division Retirement 080.78983 38000 (296) 080 190 - Mid-Tex Gas Division Retirement 080.78992 37601 (1,273) 080 190 - Mid-Tex Gas Division Retirement 080.78992 37602 (32) 080 190 - Mid-Tex Gas Division Retirement 080.78992 38000 (4,100) 080 190 - Mid-Tex Gas Division Retirement 080.79001 37601 (588) 080 190 - Mid-Tex Gas Division Retirement 080.79001 37602 (56) 080 190 - Mid-Tex Gas Division Retirement 080.79001 38000 (136) 080 190 - Mid-Tex Gas Division Retirement 080.79012 37602 (16,930) 080 190 - Mid-Tex Gas Division Retirement 080.79040 37602 (5,174) 080 190 - Mid-Tex Gas Division Retirement 080.79040 38000 (27,455) 080 190 - Mid-Tex Gas Division Retirement 080.79064 38000 (3,804) 080 190 - Mid-Tex Gas Division Retirement 080.79117 37602 (6,361) 080 190 - Mid-Tex Gas Division Retirement 080.79126 37601 (5,211) 080 190 - Mid-Tex Gas Division Retirement 080.79126 37602 (7,945) 080 190 - Mid-Tex Gas Division Retirement 080.79126 38000 (4,942) 080 190 - Mid-Tex Gas Division Retirement 080.79137 37601 (125) 080 190 - Mid-Tex Gas Division Retirement 080.79137 37800 (683) 080 190 - Mid-Tex Gas Division Retirement 080.79150 37601 (479) 080 190 - Mid-Tex Gas Division Retirement 080.79150 37602 (405) 080 190 - Mid-Tex Gas Division Retirement 080.79150 38000 (476) 080 190 - Mid-Tex Gas Division Retirement 080.79156 37601 (16) 080 190 - Mid-Tex Gas Division Retirement 080.79159 37601 (107) 080 190 - Mid-Tex Gas Division Retirement 080.79159 37602 (34) 080 190 - Mid-Tex Gas Division Retirement 080.79159 37800 (590) 080 190 - Mid-Tex Gas Division Retirement 080.79209 37601 (1,542) 080 190 - Mid-Tex Gas Division Retirement 080.79226 37601 (825) MTX Retirements by FERC Page 29 of 30 575 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corp., Mid-Tex Division CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 080 190 - Mid-Tex Gas Division Retirement 080.79226 38000 (416) 080 190 - Mid-Tex Gas Division Retirement 080.79228 37601 (584) 080 190 - Mid-Tex Gas Division Retirement 080.79228 38000 (241) 080 190 - Mid-Tex Gas Division Retirement 080.79253 37800 (420) 080 190 - Mid-Tex Gas Division Retirement 080.79288 37602 (326) 080 190 - Mid-Tex Gas Division Retirement 080.79354 37602 (20,332) 080 190 - Mid-Tex Gas Division Retirement 080.79371 37601 (208) 080 190 - Mid-Tex Gas Division Retirement 080.79374 37601 (1,502) 080 190 - Mid-Tex Gas Division Retirement 080.79374 38000 (3,805) 080 190 - Mid-Tex Gas Division Retirement 080.79388 37602 (1,169) 080 190 - Mid-Tex Gas Division Retirement 080.79411 37601 (4,898) 080 190 - Mid-Tex Gas Division Retirement 080.79411 37602 (10,219) 080 190 - Mid-Tex Gas Division Retirement 080.79411 37800 (372) 080 190 - Mid-Tex Gas Division Retirement 080.79411 38000 (429) 080 190 - Mid-Tex Gas Division Retirement 080.79440 37601 (1,706) 080 190 - Mid-Tex Gas Division Retirement 080.79485 37800 (381) 080 190 - Mid-Tex Gas Division Retirement 080.79529 37602 (1,923) 080 190 - Mid-Tex Gas Division Retirement 080.79529 37800 (983) 080 190 - Mid-Tex Gas Division Retirement 080.79546 37602 (3,603) 080 190 - Mid-Tex Gas Division Retirement 080.79546 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.79557 37601 (361) 080 190 - Mid-Tex Gas Division Retirement 080.79557 37602 (14) 080 190 - Mid-Tex Gas Division Retirement 080.79557 38000 (315) 080 190 - Mid-Tex Gas Division Retirement 080.79565 37601 (1,614) 080 190 - Mid-Tex Gas Division Retirement 080.79565 38000 (577) 080 190 - Mid-Tex Gas Division Retirement 080.79575 37601 (78,946) 080 190 - Mid-Tex Gas Division Retirement 080.79575 38000 (2) 080 190 - Mid-Tex Gas Division Retirement 080.79617 37601 (137) 080 190 - Mid-Tex Gas Division Retirement 080.79617 37602 (98) 080 190 - Mid-Tex Gas Division Retirement 080.79617 37800 (598) 080 190 - Mid-Tex Gas Division Retirement 080.79640 37602 (151) 080 190 - Mid-Tex Gas Division Retirement 080.79655 37601 (191) 080 190 - Mid-Tex Gas Division Retirement 080.79704 37800 (715) 080 190 - Mid-Tex Gas Division Retirement 080.79706 37601 (5,419) 080 190 - Mid-Tex Gas Division Retirement 080.79706 38000 (572) 080 190 - Mid-Tex Gas Division Retirement 080.79727 37601 (30) 080 190 - Mid-Tex Gas Division Retirement 080.79731 37601 (2,624) 080 190 - Mid-Tex Gas Division Retirement 080.79744 37601 (2,252) 080 190 - Mid-Tex Gas Division Retirement 080.79744 37602 (998) 080 190 - Mid-Tex Gas Division Retirement 080.79744 38000 (359) 080 190 - Mid-Tex Gas Division Retirement 080.79781 37601 (1,574) 080 190 - Mid-Tex Gas Division Retirement 080.79781 38000 (163) 080 190 - Mid-Tex Gas Division Retirement 080.79846 37602 (496) 080 190 - Mid-Tex Gas Division Retirement 080.79846 37800 (23,407) 080 190 - Mid-Tex Gas Division Retirement 080.79879 39000 (11,173) 080 190 - Mid-Tex Gas Division Retirement 080.79901 37602 (10) 080 190 - Mid-Tex Gas Division Retirement 080.79901 38000 (390) 080 190 - Mid-Tex Gas Division Retirement 080.79930 38900 (131,785) 080 190 - Mid-Tex Gas Division Retirement 080.79930 39000 (3,087,546) 080 190 - Mid-Tex Gas Division Retirement 080.79930 39004 (63,681) 080 190 - Mid-Tex Gas Division Retirement 080.79938 37601 (26,264) 080 190 - Mid-Tex Gas Division Retirement 080.80084 37602 (161) 080 190 - Mid-Tex Gas Division Retirement 080.80147 37601 (1,473) 080 190 - Mid-Tex Gas Division Retirement 080.80169 37602 (7) 080 190 - Mid-Tex Gas Division Retirement 080.80169 38000 (1) 080 190 - Mid-Tex Gas Division Retirement 080.80448 39000 (5,516) 080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39100 (1,088,937) 080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39200 (69,548) 080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39400 (2,428,904) 080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39500 (295,595) 080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39900 (29,914) 080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39901 (63,528) 080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39902 (7,694) 080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39903 (136,168) 080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39906 (2,604,010) 080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39907 (9,216) 080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39908 (203,719) 080 190 - Mid-Tex Gas Division Retirement 080.71284 37602 588 080 190 - Mid-Tex Gas Division Retirement 080.71284 38000 (588) 080 190 - Mid-Tex Gas Division Retirement 080.71639 37602 (1,500) 080 190 - Mid-Tex Gas Division Retirement 080.71639 38000 1,500 080 190 - Mid-Tex Gas Division Retirement 080.71746 37602 (2,500) 080 190 - Mid-Tex Gas Division Retirement 080.71746 38000 2,500 080 190 - Mid-Tex Gas Division Retirement 080.72248 37602 13,665 080 190 - Mid-Tex Gas Division Retirement 080.72248 38000 (13,665) 080 190 - Mid-Tex Gas Division Retirement 080.72252 37602 (1,250) 080 190 - Mid-Tex Gas Division Retirement 080.72252 38000 1,250 080 190 - Mid-Tex Gas Division Retirement 080.74165 37602 (2,000) 080 190 - Mid-Tex Gas Division Retirement 080.74165 38000 2,000 080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39000 370,659 080 190 - Mid-Tex Gas Division Retirement OTHER 37601 (4,320) 080 190 - Mid-Tex Gas Division Retirement OTHER 37602 (746) 080 190 - Mid-Tex Gas Division Retirement OTHER 38000 (17,836) 080 190 - Mid-Tex Gas Division Retirement OTHER 39200 (226,734) Total Mid-Tex Division Retirements (86,216,397) MTX Retirements by FERC Page 30 of 30 576 Item 10. ATMOS ENERGY CORP., MID-TEX DIVISION INTERIM RATE ADJUSTMENT APPLICATION PROJECT REPORT 2022 SHARED SERVICES ADDITIONS 577 Item 10. ATMOS ENERGY CORPORATION, SHARED SERVICES PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO.PROJECT NO. COST (1) ALLOCATION TO MTX DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CALENDAR YEAR 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE SSU ADDITIONS - GENERAL OFFICE PER BOOK @ 40.09% 1 010.37694 31,823 12,758 URBINT APPLICATION UPGRADE FOR OPTIMAIN THAT IS REQUIRED FOR THE DIM TEAM. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY MARCH 2 010.38345 711,302 285,161 SHARED SERVICES PC REPLACEMENTS FOR FY 2021. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY AUGUST 3 010.38402 (2,479) (994) GIS SYSTEM IMPROVEMENTS FOR GE SMALLWORLD, GE GSA, APT ESRI, OPTIMAIN, DISTRIBUTION ESRI, INTERFACES AND REPORTING. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY MARCH 4 010.39085 452 181 INFOBLOX UPGRADE. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY MARCH 5 010.39107 38,612 15,480 IMPLEMENTATION OF NEW AUTOMATION TOOLS FOR ACCOUNTS PAYABLE. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY DECEMBER 6 010.39315 8,909 3,572 SAP S4 NON-PRODUCTION STORAGE AND NETWORK HARDWARE. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY MARCH 7 010.39325 1,407,319 564,194 UPLIFT OF ATMOSENERGY.COM TO A NEW WEB PLATFORM. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY DECEMBER 8 010.39439 (87) (35) VEHICLE GEOLOCATION PROJECT - INTERFACE TO GATHER GEOLOCATION INFORMATION FROM ARI/GEOTAB AND POPULATE CLICK WITH TECHNICIAN INFORMATION. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY MARCH 9 010.39507 133,986 53,715 INSTALL AND CONFIGURE VDI CLUSTER IN THE GAS CONTROL NETWORK TO SUPPORT THE REMOTE WORK AND DR INITIATIVES. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY JUNE 10 010.39515 176,913 70,925 CARBON BLACK PERPETUAL LICENSE EXPANSION. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY SEPTEMBER 11 010.39605 (88) (35) UPGRADE THE CURRENT CADENCY SYSTEM AND CREATE NEW INTEGRATIONS TO BACK OFFICE SYSTEMS. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY MARCH 12 010.39653 1,829 733 SETUP AND INSTALLATION OF NINE TEAMS ROOMS AROUND LINCOLN CENTRE. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES EQUIPMENT MARCH 13 010.39673 28,225 11,315 DMVPN ROUTER FOR LINCOLN CENTRE - INTEGRATED SERVICES ROUTER. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY SEPTEMBER 14 010.39769 6,335 2,540 CONTROL ROOM SYSTEM ENHANCEMENTS TO BETTER OPERATIONALIZE DUAL SIM CARD MODEMS ON TIER 1 STATIONS. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY SEPTEMBER 15 010.39774 (8,228) (3,298) IMPLEMENT SOLUTION TO SUPPORT A HOT STANDBY (REDUNDANT) AND DR FOR ATLAS. OPERATIONS RTO OF TWO HOURS WITH NO DATA LOSS. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY JUNE 16 010.39905 91,012 36,487 WI-FI ENHANCEMENTS - CISCO DIGITAL NETWORK ARCHITECTURE CENTER (DNA), WIRELESS LAN CONTROLLER (WLC), AND IDENTITY SERVICES ENGINE (ISE) UPGRADE AND CONFIGURATION. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY SEPTEMBER 17 010.39966 2,435 976 DISTRIBUTION INTEGRITY MANAGEMENT - INCORPORATE NEW FUNCTIONALITY FOR INTERACTIVE THREAT ANALYSIS INTO THE ATMOS DNV DRAM SYNERGY RISK MODEL. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY MARCH 18 010.40011 35,155 14,094 WINBILL INFRASTRUCTURE AND LICENSE INCREASE. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY SEPTEMBER 19 010.40026 16,080 6,446 CRM REPORTING PROJECT TO ENHANCE OMS TO SUPPORT DOT 192.631 PHMSA RELATED COMPLIANCE REQUIREMENTS AND AUTOMATED REPORTING TO IMPROVE EFFICIENCY AND ACCURACY. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY DECEMBER 20 010.40190 24,798 9,942 USER DEVICE TRACKER UPGRADE. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY SEPTEMBER 21 010.40226 23,482 9,414 QUORUM PGAS INTERFACE ENHANCEMENTS DEVELOPMENT. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY MARCH 22 010.40282 174,095 69,795 WINDOWS AUTOMATION ANSIBLE ACCELERATOR - DEVELOP CODE AND CONFIGURATION WITH ANSIBLE TOOLS TO AUTOMATE WINDOWS SERVER MANAGEMENT. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY SEPTEMBER 23 010.40337 26,449 10,604 CARBON BLACK LICENSE IMPROVEMENTS - PERPETUAL LICENSES FOR RESPONSE ON-PREMISE FOR WINDOWS AND LINUX. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY JUNE 24 010.40456 3,142,460 1,259,812 UPGRADE TIER 1 STORAGE AT LINCOLN CENTRE - ACQUIRE NEW POWERMAX DISK ARRAY. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY DECEMBER 25 010.40457 2,766,355 1,109,032 UPGRADE BACKUP STORAGE LINCOLN CENTRE. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY DECEMBER 26 010.40458 1,720,265 689,654 REPLACE VMAX STORAGE. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY DECEMBER 27 010.40466 123,054 49,332 GIS ENHANCEMENT PROJECT FOR APPLICATION UPDATES / IMPROVEMENTS OF SMALLWORLD, TRANSMISSION GIS AND SYNCH, GAS AND OTHER TOOLS. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY DECEMBER 28 010.40504 249,557 100,047 LICENSE GROWTH FOR LASERFICHE. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY MAY 29 010.40578 3,720 1,491 ONE LAPTOP COMPUTER ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY MARCH 30 010.40631 865,468 346,966 SENSUS/XYLEM RNI UPGRADE TO V4.10. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY DECEMBER 31 010.40682 1,880 754 HR VACCINE MANAGEMENT WORKDAY EXTEND APPLICATION CREATION. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY MARCH 32 010.40683 105,747 42,394 UPGRADE OF THE LASERFICHE INFRASTRUTURE AND APPLICATION. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY SEPTEMBER 33 010.40687 23,778 9,533 REPLACE 8 HEAVY DUTY 24/7 ROOM CHAIRS IN GAS CONTROL ROOM AND BACKUP GAS CONTROL ROOM. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES EQUIPMENT JUNE 34 010.40688 8,905 3,570 REPLACE SEVEN HEAVY DUTY 24/7 CHAIRS IN GAS CONTROL ROOM AND BACKUP GAS CONTROL ROOM. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES EQUIPMENT JUNE 35 010.40690 9,113 3,653 REPLACE THREE HEAVY DUTY 24/7 CHAIRS IN GAS CONTROL ROOM. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES EQUIPMENT JUNE 36 010.40775 922,356 369,772 ENHANCE ATLAS APPLICATION TO SUPPORT SUSTAINABILITY FOR PRESSURE MONITORING GUIDEANCE (PMG) WITH NEW FUNCTIONS/FEATURES. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY DECEMBER 37 010.40871 166,391 66,706 AUTOMATED MOBILE LEAK DETECTION IMPROVEMENTS / ENHANCEMENTS FOR 2022. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY DECEMBER 38 010.40934 3,834 1,537 PURCHASE ADDITIONAL KOFAX MARKVIEW LICENSES. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY SEPTEMBER 39 010.40947 2,640 1,058 ONE LAPTOP COMPUTER ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY MARCH 40 010.40998 10,837 4,345 OT TUNNELING. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY SEPTEMBER 41 010.41014 104,886 42,049 IMPLEMENT THE DRAGOS PLATFORM HARDWARE AND SOFTWARE TO IMPROVE CYBERSECURITY MEASURES FOR DISTRIBUTION OT. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY JUNE 42 010.41082 4,131 1,656 CHECK PRINTER FOR ACCOUNTS PAYABLE. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES EQUIPMENT MARCH 43 010.41148 96,406 38,649 OT NETWORK SEPARATION - OPERATION TECHNOLOGY SEPARATION. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY DECEMBER 44 010.41227 4,484 1,798 WIRELESS AP'S FOR GAS SUPPLY. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY SEPTEMBER 45 010.41689 9,966 3,995 REPLACE END OF LIFE BATTERIES ON THE DATA CENTER UPS. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY JULY 46 010.41698 8,776 3,518 WORKSTATIONS FOR SECONDARY GAS CONTROL ROOM THAT ARE ON THE SECURE NETWORK. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY DECEMBER SSU Additions Page 1 of 3 578 Item 10. ATMOS ENERGY CORPORATION, SHARED SERVICES PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO.PROJECT NO. COST (1) ALLOCATION TO MTX DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CALENDAR YEAR 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 47 010.41754 3,004 1,204 ONE LAPTOP COMPUTER. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY SEPTEMBER 48 010.41758 22,517 9,027 INSTALL THREE SECURITY CARD READERS IN BACKUP GAS CONTROL ROOM. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES STRUCTURES SEPTEMBER 49 010.41855 44,184 17,713 CAPTURIS NEW SERVICE SETUP - DEVELOPMENT OF ON PREMISE APPLICATION TO REQUEST NEW TURN ON/OFF SERVICE. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY DECEMBER 50 010.42113 11,590 4,646 SAFETY ENHANCEMENT TO GAS CONTROL DISPLAYS TO SUPPORT REMOTE CONTROL OF ISOLATION VALVES ON THE DISTRIBUTION SYSTEMS. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY DECEMBER 51 010.42154 21,568 8,647 UPGRADE SPECTRUM GEOCODING SYSTEM TO THE LATEST SOFTWARE VERSION WITH UPGRADED HARDWARE PROCESSING CAPABILITY. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY DECEMBER 52 010.42273 83,736 33,570 LC 2, 16TH FLOOR - PURCHASE AND INSTALL NINE NEW WORKSTATIONS. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES STRUCTURES DECEMBER 53 TOTAL SSU GENERAL OFFICE ADDITIONS ALLOCATED @ 40.09% (LN. 1 - LN. 52)13,469,939 5,400,098 54 55 56 SSU ADDITIONS - GREENVILLE AVENUE PER BOOK @ 14.18% 57 010.38765 (604,566) (85,720) GVA FUEL CELL. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES STRUCTURES SEPTEMBER 58 010.40051 300,029 42,541 UPS-A BATTERY SUBSYSTEM IN GVA. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY AUGUST 59 010.40688 11,873 1,683 REPLACE SEVEN HEAVY DUTY 24/7 CHAIRS IN GAS CONTROL ROOM AND BACKUP GAS CONTROL ROOM. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES EQUIPMENT JUNE 60 TOTAL SSU GREENVILLE AVENUE ADDITIONS ALLOCATED @ 14.18% (LN. 57 - LN. 59)(292,663) (41,496) 61 62 63 SSU ADDITIONS - ALIGNE PIPE PER BOOK @ 6.13% 64 010.35984 16,125 989 ALIGNE APPLICATION IMPROVEMENTS FROM A LIST OF ENHANCEMENTS COLLECTED FROM THE ENTERPRISE ROLLOUT. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY MARCH 65 010.40476 4,812 295 ALIGNE SOFTWARE ENHANCEMENTS AND SERVICES. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY OCTOBER 66 TOTAL SSU ALIGNE PIPE ADDITIONS ALLOCATED @ 6.13% (LN. 64 - LN. 65)20,937 1,284 67 68 69 SSU ADDITIONS - CUSTOMER SUPPORT PER BOOK @ 53.00% 70 010.36666 1,030 546 NETWORK ACCESS SWITCHES IN THE VAUGHAN CENTER AND THE CONTACT CENTERS. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY MARCH 71 010.38587 66,715 35,359 CONTACT CENTER PC REPLACEMENTS FOR FY21. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY SEPTEMBER 72 010.39300 6,165,667 3,267,804 S4 HANA IMPLEMENTATION. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY SEPTEMBER 73 010.40445 14,075 7,460 REPLACE 4 INCH POLY AIRLINE WITH 2 INCH COATED STEEL. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES EQUIPMENT JUNE 74 010.40572 135,493 71,811 WACO CUSTOMER CONTACT CENTER RESTROOMS UPGRADES. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES STRUCTURES AUGUST 75 010.42446 55,381 29,352 PURCHASE AND INSTALL NEW SOUND MASKING SYSTEM FOR WACO CONTACT CENTER. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES STRUCTURES DECEMBER 76 TOTAL SSU CUSTOMER SUPPORT ADDITIONS ALLOCATED @ 53.00% (LN. 70 - LN. 75)6,438,361 3,412,332 77 78 79 SSU ADDITIONS - CHARLES K. VAUGHAN PER BOOK @ 71.83% 80 010.40518 49,022 35,210 14 COMPUTERS FOR TECHNICAL TRAINING INSTRUCTORS. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES EQUIPMENT FEBRUARY 81 010.40519 7,003 5,030 2 COMPUTERS FOR TECHNICAL TRAINING INSTRUCTORS. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES EQUIPMENT FEBRUARY 82 010.40521 43,690 31,380 4 GAS TRAC LZ-30 KITS FOR TECHNICAL TRAINING. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES EQUIPMENT FEBRUARY 83 010.41283 8,273 5,942 CKV ICE MACHINE REPLACEMENT. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES EQUIPMENT JUNE 84 010.41464 76,569 54,996 CKV - MODIFICATIONS TO THE PIGGING LOOP AT CKV. THESE MODIFICATIONS ARE NEEDED IN ORDER TO FACILITATE TRAINING FOR ATMOS EMPLOYEES ON THE NEW PIGGING PROCESS. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES EQUIPMENT DECEMBER 85 010.41468 5,679 4,079 CKV - INSTRUCTOR CAMERA KIT. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES EQUIPMENT JUNE 86 010.41658 16,839 12,095 12 LAPTOP COMPUTERS FOR TECHNICAL TRAINING STUDENTS ATTENDING CLASS IN-PERSON. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES EQUIPMENT SEPTEMBER 87 010.41723 1,900 1,365 CKV - FLEXIBLE ARM, BASE AND MICROSCOPE KIT FOR TECHNICAL TRAINING. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES EQUIPMENT JULY 88 010.41861 4,369 3,138 CKV INSTRUCTOR CAMCORDERS FOR VIRTUAL CLASSES, LIVE DEMONSTRATIONS AND WHEN CAMERA NEEDS TO MOVE AROUND DURING CLASSES. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES EQUIPMENT OCTOBER 89 010.41929 7,780 5,588 THREE LAPTOP COMPUTERS TO REPLACE ONES NO LONGER UNDER SUPPORT. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES EQUIPMENT SEPTEMBER SSU Additions Page 2 of 3 579 Item 10. ATMOS ENERGY CORPORATION, SHARED SERVICES PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022 LINE NO.PROJECT NO. COST (1) ALLOCATION TO MTX DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CALENDAR YEAR 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE 90 TOTAL SSU CHARLES K. VAUGHAN ADDITIONS ALLOCATED @ 71.83% (LN. 80 - LN. 89)221,123 158,822 91 92 TOTAL SHARED SERVICES ADDITIONS (LN. 53 + LN. 60 + LN. 66 + LN. 76 + LN. 90)19,857,696 8,931,040 93 94 95 NOTES: 96 (1) The "COST" column reflects the capitalized portion of the cost only. 97 (2) The "DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CALENDAR YEAR 2022" column describes capitalized costs only. SSU Additions Page 3 of 3 580 Item 10. ATMOS ENERGY CORP., MID-TEX DIVISION INTERIM RATE ADJUSTMENT APPLICATION PROJECT REPORT 2022 SHARED SERVICES ADDITIONS BY FERC ACCOUNT 581 Item 10. ATMOS ENERGY CORPORATION, SHARED SERVICES PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corporation, Shared Services CY 2022 Project Additions by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 010 002 - Dallas Atmos Rate Division Addition 010.35984 39938 16,125 010 002 - Dallas Atmos Rate Division Addition 010.37694 39908 31,823 010 002 - Dallas Atmos Rate Division Addition 010.38345 39906 711,302 010 002 - Dallas Atmos Rate Division Addition 010.38402 39908 (2,479) 010 002 - Dallas Atmos Rate Division Addition 010.38765 39005 (604,566) 010 002 - Dallas Atmos Rate Division Addition 010.39085 39903 452 010 002 - Dallas Atmos Rate Division Addition 010.39107 39908 38,612 010 002 - Dallas Atmos Rate Division Addition 010.39315 39901 7,764 010 002 - Dallas Atmos Rate Division Addition 010.39315 39903 1,145 010 002 - Dallas Atmos Rate Division Addition 010.39325 39908 1,407,319 010 002 - Dallas Atmos Rate Division Addition 010.39439 39908 (87) 010 002 - Dallas Atmos Rate Division Addition 010.39507 39901 133,986 010 002 - Dallas Atmos Rate Division Addition 010.39515 39908 176,913 010 002 - Dallas Atmos Rate Division Addition 010.39605 39908 (88) 010 002 - Dallas Atmos Rate Division Addition 010.39653 39700 1,829 010 002 - Dallas Atmos Rate Division Addition 010.39673 39903 28,225 010 002 - Dallas Atmos Rate Division Addition 010.39769 39908 6,335 010 002 - Dallas Atmos Rate Division Addition 010.39774 39908 (8,228) 010 002 - Dallas Atmos Rate Division Addition 010.39905 39908 91,012 010 002 - Dallas Atmos Rate Division Addition 010.39966 39908 2,435 010 002 - Dallas Atmos Rate Division Addition 010.40011 39908 35,155 010 002 - Dallas Atmos Rate Division Addition 010.40026 39908 16,080 010 002 - Dallas Atmos Rate Division Addition 010.40051 39005 300,029 010 002 - Dallas Atmos Rate Division Addition 010.40190 39908 24,798 010 002 - Dallas Atmos Rate Division Addition 010.40226 39908 23,482 010 002 - Dallas Atmos Rate Division Addition 010.40282 39908 174,095 010 002 - Dallas Atmos Rate Division Addition 010.40337 39908 26,449 010 002 - Dallas Atmos Rate Division Addition 010.40456 39901 3,142,460 010 002 - Dallas Atmos Rate Division Addition 010.40457 39901 2,766,355 010 002 - Dallas Atmos Rate Division Addition 010.40458 39901 1,720,265 010 002 - Dallas Atmos Rate Division Addition 010.40466 39908 123,054 010 002 - Dallas Atmos Rate Division Addition 010.40476 39938 4,812 010 002 - Dallas Atmos Rate Division Addition 010.40504 39908 249,557 010 002 - Dallas Atmos Rate Division Addition 010.40578 39906 3,720 010 002 - Dallas Atmos Rate Division Addition 010.40631 39908 865,468 010 002 - Dallas Atmos Rate Division Addition 010.40682 39908 1,880 010 002 - Dallas Atmos Rate Division Addition 010.40683 39908 105,747 010 002 - Dallas Atmos Rate Division Addition 010.40687 39100 23,778 010 002 - Dallas Atmos Rate Division Addition 010.40688 39100 8,905 010 002 - Dallas Atmos Rate Division Addition 010.40688 39104 11,873 010 002 - Dallas Atmos Rate Division Addition 010.40690 39100 9,113 010 002 - Dallas Atmos Rate Division Addition 010.40775 39908 922,356 010 002 - Dallas Atmos Rate Division Addition 010.40871 39908 166,391 010 002 - Dallas Atmos Rate Division Addition 010.40934 39908 3,834 010 002 - Dallas Atmos Rate Division Addition 010.40947 39906 2,640 010 002 - Dallas Atmos Rate Division Addition 010.40998 39903 10,837 010 002 - Dallas Atmos Rate Division Addition 010.41014 39902 104,886 010 002 - Dallas Atmos Rate Division Addition 010.41082 39100 4,131 010 002 - Dallas Atmos Rate Division Addition 010.41148 39903 96,406 010 002 - Dallas Atmos Rate Division Addition 010.41227 39903 4,484 010 002 - Dallas Atmos Rate Division Addition 010.41689 39903 9,966 010 002 - Dallas Atmos Rate Division Addition 010.41698 39906 8,776 010 002 - Dallas Atmos Rate Division Addition 010.41754 39906 3,004 010 002 - Dallas Atmos Rate Division Addition 010.41758 39000 22,517 010 002 - Dallas Atmos Rate Division Addition 010.41855 39908 44,184 010 002 - Dallas Atmos Rate Division Addition 010.42113 39908 11,590 010 002 - Dallas Atmos Rate Division Addition 010.42154 39908 21,568 010 002 - Dallas Atmos Rate Division Addition 010.42273 39100 83,736 Total SSU General Office (Div 002)13,198,211 010 012 - Call Center Division Addition 010.36666 39903 1,030 010 012 - Call Center Division Addition 010.38587 39906 66,715 010 012 - Call Center Division Addition 010.39300 39901 2,210,661 010 012 - Call Center Division Addition 010.39300 39908 3,955,006 010 012 - Call Center Division Addition 010.40445 39800 14,075 010 012 - Call Center Division Addition 010.40518 39916 49,022 010 012 - Call Center Division Addition 010.40519 39916 7,003 010 012 - Call Center Division Addition 010.40521 39410 43,690 010 012 - Call Center Division Addition 010.40572 39009 135,493 010 012 - Call Center Division Addition 010.41283 39110 8,273 010 012 - Call Center Division Addition 010.41464 39110 76,569 010 012 - Call Center Division Addition 010.41468 39710 5,679 010 012 - Call Center Division Addition 010.41658 39710 16,839 010 012 - Call Center Division Addition 010.41723 39410 1,900 010 012 - Call Center Division Addition 010.41861 39110 4,369 010 012 - Call Center Division Addition 010.41929 39710 7,780 010 012 - Call Center Division Addition 010.42446 39009 55,381 Total SSU Customer Support (Div 012)6,659,484 Total SSU Additions 19,857,696 SSU Additions by FERC Page 1 of 1 582 Item 10. ATMOS ENERGY CORP., MID-TEX DIVISION INTERIM RATE ADJUSTMENT APPLICATION PROJECT REPORT 2022 SHARED SERVICES RETIREMENTS 583 Item 10. ATMOS ENERGY CORPORATION, SHARED SERVICES PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST (1) ALLOCATION TO MTX DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CALENDAR YEAR 2022 (2) CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT SSU RETIREMENTS - GENERAL OFFICE PER BOOK @ 40.09% 1 010.26877 (1,071,341.24) (429,501) THIS PROJECT WILL UPGRADE PGAS TO THE LATEST VERSION, WHICH IS 16. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY 2 010.26877 1,071,341.24 429,501 THIS PROJECT WILL UPGRADE PGAS TO THE LATEST VERSION, WHICH IS 16. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY 3 010.33907 20,372.06 8,167 ONE DESKTOP COMPUTER AND FOUR LAPTOP COMPUTERS. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY 4 010.33907 (20,372.06) (8,167) ONE DESKTOP COMPUTER AND FOUR LAPTOP COMPUTERS. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY 5 TOTAL SSU GENERAL OFFICE RETIREMENTS ALLOCATED @ 40.09% (LN. 1 - LN. 4)- - 6 7 8 SSU RETIREMENTS - CHARLES K. VAUGHAN PER BOOK @ 71.83% 9 ADMIN 010 (47,939) (34,432) ADMIN. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY 10 ADMIN 010 (23,632) (16,974) ADMIN. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY 11 ADMIN 010 (290,207) (208,442) ADMIN. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY 12 ADMIN 010 (140,469) (100,892) ADMIN. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY 13 ADMIN 010 (12,039) (8,647) ADMIN. ALL ATMOS CUSTOMERS - MIXED SHARED SERVICES INFORMATION TECHNOLOGY 14 TOTAL SSU CHARLES K. VAUGHAN RETIREMENTS ALLOCATED0 @ 71.83% (LN. 9 - LN. 13)(514,286) (369,387) 15 16 TOTAL SHARED SERVICES RETIREMENTS (LN. 5 + LN. 14)(514,286) (369,387) SSU Retirements Page 1 of 1 584 Item 10. ATMOS ENERGY CORP., MID-TEX DIVISION INTERIM RATE ADJUSTMENT APPLICATION PROJECT REPORT 2022 SHARED SERVICES RETIREMENTS BY FERC ACCOUNT 585 Item 10. ATMOS ENERGY CORPORATION, SHARED SERVICES PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022 Atmos Energy Corporation, Shared Services CY 2022 Project Retirements by FERC Account COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST 010 002 - Dallas Atmos Rate Division Retirement 010.26877 39907 (1,071,341.24) 010 002 - Dallas Atmos Rate Division Retirement 010.26877 39908 1,071,341.24 010 002 - Dallas Atmos Rate Division Retirement 010.33907 39906 20,372.06 010 002 - Dallas Atmos Rate Division Retirement 010.33907 39907 (20,372.06) Total SSU General Office (Div 002)- 010 012 - Call Center Division Retirement ADMIN 010 39110 (47,938.52) 010 012 - Call Center Division Retirement ADMIN 010 39510 (23,632.07) 010 012 - Call Center Division Retirement ADMIN 010 39710 (290,207.46) 010 012 - Call Center Division Retirement ADMIN 010 39910 (140,468.62) 010 012 - Call Center Division Retirement ADMIN 010 39916 (12,039.16) Total SSU Customer Support (Div 012)(514,285.83) Total SSU Retirements (514,285.83) SSU Retirements by FERC Page 1 of 1 586 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION  PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE REIMBURSEMENT RECEIVED? YES/NO COMMENTS / ADDITIONAL INFORMATION RELATED TO THE AMOUNT IN COLUMN "COST" MID-TEX RELOCATIONS 1 080.45638 (46,996) RELOCATE FACILITIES. INSTALL 41 FEET OF 6 INCH, 37 FEET OF 8 INCH, 30 FEET OF 10 INCH AND 4409 FEET OF 16 INCH STEEL AND ABANDON 237 FEET OF 6 INCH, 787 FEET OF 8 INCH, 30 FEET OF 10 INCH, 170 FEET OF 12 INCH AND 3396 FEET OF 16 INCH STEEL ALONG EAST AVENUE H TO ACCOMMODATE TXDOT STREET PROJECT.ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES MAY YES $3,120,556.95 CREDITED IN 2022 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 2 080.46146 5 RELOCATE FACILITIES. INSTALL 125 FEET OF 6 INCH, 250 FEET OF 4 INCH, 2920 FEET OF 2 INCH POLY ALONG YEWPON AND ABANDON 90 FEET OF 6 INCH, 215 FEET OF 4 INCH, 2700 FEET OF 2 INCH STEEL AND 120 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 3 080.47046 11,979 RELOCATE FACILITIES. INSTALL 248 FEET OF 2 INCH POLY AND 351 FEET OF 4 INCH POLY AND 5045 FEET OF 6 INCH POLY AND ABANDON 294 FEET OF 2 INCH POLY AND 3474 FEET OF 4 INCH STEEL AND 1847 FEET OF 4 INCH POLY ALONG WHITE CHAPEL BOULEVARD TO ACCOMMODATE CITY OF SOUTHLAKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SOUTHLAKE SYSTEM INTEGRITY OCTOBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 4 080.47311 97 RELOCATE FACILITIES. INSTALL 3630 FEET OF 2 INCH POLY ALONG ROYALTON AND ABANDON 3625 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 5 080.47445 6 RELOCATE FACILITIES. INSTALL 220 FEET OF 4 INCH AND 1930 FEET OF 2 INCH POLY ALONG NECHES AND ABANDON 645 FEET OF 4 INCH POLY AND 1350 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 6 080.47605 43 INSTALL 1150 FEET OF 2 INCH POLY ALONG HENDERSON AVENUE AND ABANDON 1150 FEET OF CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 7 080.47607 293 ABANDON 3200 FEET OF 6 AND 8 INCH CAST IRON ALONG HENDERSON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 8 080.48519 1 RELOCATE FACILITIES. INSTALL 3080 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG MERIDA AND ABANDON 2915 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 9 080.48800 83 RELOCATE FACILITIES. INSTALL 4,160 FEET OF 8 INCH, 165 FEET OF 4 INCH, AND 1320 FEET OF 3 INCH POLY ALONG ABRAM STREET AND ABANDON 1,400 FEET OF 8 INCH, 1,760 FEET OF 4 INCH, 620 FEET OF 2 INCH STEEL, AND 1,830 FEET OF 2 INCH AND 50 FEET OF 4 INCH POLY TOACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 10 080.48844 1 INSTALL 2375 FEET OF 2 INCH POLY ALONG COCHRAN AND ABANDON 2375 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO PROJECT IS NOT REIMBURSABLE 11 080.49082 1 RELOCATE FACILITIES. INSTALL 30 FEET OF 6 INCH POLY, 30 FEET OF 6 INCH STEEL, 275 FEET OF 4 INCH POLY, AND 250 FEET OF 2 INCH POLY ALONG SPRING VALLEY AND ABANDON 25 FEET OF 6 INCH, 1175 FEET OF 6 INCH AND 1130 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 12 080.49174 1 RELOCATE FACILITIES. INSTALL 755 FEET OF 4 INCH POLY ALONG ROSEDALE STREET AND ABANDON 638 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 13 080.49441 1 RELOCATE FACILITIES. INSTALL 3394 FEET OF 4 INCH POLY ALONG HARDEMAN STREET AND ABANDON 2100 FEET OF 4 INCH CAST IRON AND 1100 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 14 080.49679 2 RELOCATE FACILITIES. INSTALL (51) 0.75 POLY SERVICES ALONG EDGEWOOD TERRACE AND ABANDON (51) 0.75 STEEL SERVICES TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 15 080.49984 1 RELOCATE FACILITIES. INSTALL 175 FEET OF 2 INCH, 1850 FEET OF 4 INCH, 210 FEET OF 6 INCH POLY ALONG MEADOW LANE AND ABANDON 65 FEET OF 2 INCH, 265 FEET OF 3 INCH, 1635 FEET OF 4 INCH, 85 FEET OF 6 INCH STEEL, 95 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 16 080.50331 1 RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY ALONG SKYLINE DRIVE AND ABANDON 700 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW DRAINAGE IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 17 080.50421 1 RELOCATE FACILITIES. INSTALL (77) 0.75 INCH SERVICES ALONG HILL STREET AND ABANDON (77) 0.75 INCH SERVICES TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. MTX Relocations Page 1 of 12 587 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION  PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE REIMBURSEMENT RECEIVED? YES/NO COMMENTS / ADDITIONAL INFORMATION RELATED TO THE AMOUNT IN COLUMN "COST" 18 080.50424 1 RELOCATE FACILITIES. INSTALL (7) 0.75 INCH POLY SERVICES ALONG AIRLINE STREET AND ABANDON 1830 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 19 080.50504 1 RELOCATE FACILITIES. INSTALL (27) 0.75 INCH POLY SERVICES ALONG HARWEN TERRACE AND ABANDON (27) POLY SERVICES TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 20 080.50529 2 RELOCATE FACILITIES. INSTALL 98 POLY SERVICES AND ABANDON 98 STEEL SERVICES ALONG ROSEDALE STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 21 080.50745 3 RELOCATE FACILITIES. INSTALL 240 FEET OF 2 INCH, 120 FEET OF 3 INCH, AND 60 FEET OF 4 INCH POLY ALONG FOREST HILL DRIVE AND ABANDON 220 FEET OF 2 INCH, 100 FEET OF 3 INCH, AND 50 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FOREST HILL SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 22 080.50830 1 RELOCATE FACILITIES. INSTALL (19) 0.75 INCH POLY SERVICES ALONG SURREY DRIVE AND ABANDON (19) 0.75 INCH SERVES TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 23 080.51030 2 RELOCATE FACILITIES. INSTALL 937 FEET OF 6 INCH, 567 FEET OF 4 INCH POLY AND ABANDON 920 FEET OF 6 INCH STEEL, 690 FEET OF 4 INCH CAST IRON ALONG SYLVANIA TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 24 080.51053 5 RELOCATE FACILITIES. INSTALL 1320 FEET OF 4 INCH AND 560 FEET OF 2 INCH POLY ALONG DAVIS STREET AND ABANDON 1635 FEET OF 8 INCH, 320 FEET OF 6 INCH AND 250 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 25 080.51054 3 RELOCATE FACILITIES. INSTALL 1050 FEET OF 4 INCH, 640 FEET OF 2 INCH AND 60 FEET OF 8 INCH POLY AND ABANDON 1330 FEET OF 8 INCH, 50 FEET OF 6 INCH, 895 FEET OF 4 INCH CAST IRON, AND 50 FEET OF 8 INCH STEEL ALONG DAVIS STREET TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 26 080.51142 507 RELOCATE FACILITIES. INSTALL 293 FEET OF 4 INCH, 807 FEET OF 6 INCH, 10 FEET OF 8 INCH AND 10320 FEET OF 12 INCH POLY ALONG CROWLEY ROAD AND ABANDON 2940 FEET OF 4 INCH, 2695 FEET OF 6 INCH AND 195 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 27 080.51176 2 RELOCATE FACILITIES. INSTALL 800 FEET OF 8 INCH ALONG OVERTON AND ABANDON 800 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 28 080.51220 30,993 RELOCATE FACILITIES. INSTALL 16 FEET OF 6 INCH, 11 FEET OF 8 INCH AND 12255 FEET OF 12 INCH STEEL ALONG LINE O1 AND ABANDON 2365 FEET OF 3 INCH, 6136 FEET OF 4 INCH, 3026 FEET OF 6 INCH AND 4980 FEET OF 8 INCH STEEL TO ACCOMMODATE PRIME POINTE DEVELOPMENT RESIDENTIAL LANCASTER RELOCATION OF FACILITIES DECEMBER YES $3,815,605.00 CREDITED IN 2017 TO ACCOUNT 101. $832,602.28 DEBITED IN 2017 FOR REFUND EXCESS CIAC. REIMBURSEMENT COMPLETE. 29 080.51250 1 RELOCATE FACILITIES. INSTALL 840 FEET OF 6 INCH AND 200 FEET OF 4 INCH POLY ALONG LAFAYETTE AVENUE AND ABANDON 840 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 30 080.51317 1 RELOCATE FACILITIES. INSTALL 1642 FEET OF 2 INCH POLY ALONG ELINOR STREET AND ABANDON 1642 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 31 080.51318 1 RELOCATE FACILITIES. INSTALL 398 FEET OF 2 INCH, 1834 FEET OF 4 INCH POLY AND ABANDON 615 FEET OF 2 INCH, 1456 FEET OF 3 INCH STEEL ALONG HOLLIS STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 32 080.51395 1 RELOCATE FACILITIES. INSTALL 1560 FEET OF 4 INCH POLY ALONG WILKES STREET AND ABANDON 1500 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 33 080.51396 1 RELOCATE FACILITIES. INSTALL 305 FEET OF 2 INCH AND 105 FEET OF 6 INCH POLY ALONG ASHBURY DRIVE AND ABANDON 100 FEET OF 1-1/4 INCH, 80 FEET OF 2 INCH, AND 100 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 34 080.51405 1 RELOCATE FACILITIES. INSTALL 945 FEET OF 2 INCH POLY ALONG SOUTH ROBERTS AND ABANDON 945 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 35 080.51676 (1) RELOCATE FACILITIES. INSTALL 1470 FEET OF 4 INCH POLY AND ABANDON 720 FEET OF 4 INCH CAST IRON ALONG CARNATION AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. MTX Relocations Page 2 of 12 588 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION  PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE REIMBURSEMENT RECEIVED? YES/NO COMMENTS / ADDITIONAL INFORMATION RELATED TO THE AMOUNT IN COLUMN "COST" 36 080.51702 3 RELOCATE FACILITIES. INSTALL 2600 FEET OF 4-INCH AND 180 FEET OF 2-INCH POLY AND ABANDON 2200 FEET OF 4-INCH STEEL, 1,200 FEET OF 4-INCH POLY ALONG STATE HIGHWAY 21 TO ACCOMMODATE CITY OF BRYAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 37 080.51801 1 RELOCATE FACILITIES. INSTALL 1712 FEET OF 2 INCH POLY AND ABANDON 997 FEET OF 4 INCH STEEL AND 860 FEET OF 4 INCH CAST IRON ALONG SYLVANIA TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 38 080.51806 5 RELOCATE FACILITIES. INSTALL 3126 FEET OF 4 INCH POLY ALONG YUCCA AVENUE AND ABANDON 2736 FEET OF 4 INCH CAST IRON AND 540 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 39 080.51843 21 RELOCATE FACILITIES. INSTALL 1715 FEET OF 4 INCH POLY AND ABANDON 678 FEET OF 4 INCH POLY AND 984 FEET OF 4 INCH CAST IRON ALONG DOROTHY LANE TO ACCOMODATE A CITY OF FORT WORTH DRAINAGE IMPROVEMENT PROJECT TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 40 080.51920 23,907 RELOCATE FACILITIES. INSTALL 720 FEET OF 2 INCH, 450 FEET OF 4 INCH, 485 FEET OF 6 INCH AND 950 FEET OF 8 INCH POLY ALONG IH35 AND ABANDON 425 FEET OF 4 INCH STEEL, 440 FEET OF 8 INCH, 690 FEET OF 6 INCH, 315 FEET OF 3 INCH, AND 470 FEET OF 2 INCH POLY TO ACCOMMODATE TXDOT PROJECT.ALL CUSTOMERS DENTON RELOCATION OF FACILITIES APRIL NO $815,369.08 CREDITED IN 2019 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 41 080.52029 1 RELOCATE FACILITIES. INSTALL 398 FEET OF 2 INCH, 342 FEET OF 4 INCH POLY ALONG AVENUE U AND ABANDON 84 FEET OF 3 INCH, 73 FEET OF 2 INCH, 88 FEET OF 1 1/14 POLY, 12 FEET OF 3 INCH, 316 FEET OF 4 INCH, 93 FEET OF 3 STEEL TO ACCOMMODATE CITY OF TEMPLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 42 080.52036 39 RELOCATE FACILITIES. INSTALL 1380 FEET OF 4 INCH POLY AND 400 FEET OF 6 INCH POLY ALONG GOLIAD STREET AND ABANDON 173 FEET OF 3 INCH POLY, 1010 FEET OF 4 INCH POLY AND 383 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY OCTOBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 43 080.52108 1,586,604 RELOCATE FACILITIES. INSTALL 485 FEET OF 2 INCH POLY AND 6490 FEET OF 6 INCH POLY; AND 800 FEET OF 10 INCH STEEL CASING ALONG BONNIE BRAE STREET AND ABANDON 490 FEET OF 2 INCH POLY, 935 FEET OF 4 INCH POLY AND 5,765 FEET OF 4 INCH STEEL TO ACCOMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 44 080.52540 1 RELOCATE FACILITIES. INSTALL 400 FEET OF 8 INCH AND 150 FEET OF 4 INCH POLY ALONG LEMMON AVENUE AND ABANDON 154 FEET OF 6 INCH AND 437 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 45 080.53221 278 RELOCATE FACILITIES. INSTALL 324 FEET OF 2 INCH AND 7346 FEET OF 4 INCH POLY AND ABANDON 4530 FEET OF 2 INCH STEEL AND 25 FEET OF 2 INCH POLY AND 325 FEET OF 4 INCH POLY ALONG ABRAM STREET TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 46 080.53384 183 RELOCATE FACILITIES. INSTALL 310 FEET OF 6 INCH AND 5927 FEET OF 8 INCH POLY ALONG SOUTHWEST PARKWAY AND ABANDON 37 FEET OF 4 INCH, 208 FEET OF 6 INCH, AND 5185 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GRAND PRAIRI SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 47 080.53535 1 RELOCATE FACILITIES. INSTALL 4560 FEET OF 6 INCH, 320 FEET OF 4 INCH, AND 760 FEET OF 2 INCH POLY ALONG PIPELINE ROAD AND ABANDON 4560 FEET OF 6 INCH, 320 FEET OF 4 INCH, AND 760 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF HURST STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 48 080.53591 44 RELOCATE FACILITIES. INSTALL 6 FEET OF 2 INCH, 8 FEET OF 3 INCH, 231 FEET OF 4 INCH, AND 1091 FEET OF 6 INCH POLY ALONG NEW YORK AVENUE AND ABANDON 890 FEET OF 6 INCH, 160 FEET OF 3 INCH, AND 150 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 49 080.53909 4 RELOCATE FACILITIES. INSTALL 3900 FEET OF 24 INCH STEEL AND ABANDON 3175 FEET OF 24 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS WHEATLAND ROAD IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 50 080.54000 1 RELOCATE FACILITIES. INSTALL 807 FEET OF 2 INCH AND 1356 FEET OF 6 INCH POLY ALONG BELKNAP AND ABANDON 50 FEET OF 2 INCH, 55 FEET OF 6 INCH POLY AND 1356 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 51 080.54002 1 RELOCATE FACILITIES. INSTALL 957 FEET OF 4 INCH POLY ALONG MONTREAL CIRCLE AND ABANDON 875 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF HALTOM STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. MTX Relocations Page 3 of 12 589 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION  PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE REIMBURSEMENT RECEIVED? YES/NO COMMENTS / ADDITIONAL INFORMATION RELATED TO THE AMOUNT IN COLUMN "COST" 52 080.54043 5 RELOCATE FACILITIES. INSTALL 3706 FEET OF 4 INCH ALONG BOYD AVENUE AND ABANDON 81 FEET OF 2 INCH, 482 FEET OF 3 INCH , 1681 FEET OF 4 INCH CAST IRON , 2657 FEET OF 6 INCH CAST IRON , 220 FEET OF 4 INCH POLY, AND 50 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 53 080.54046 75 RELOCATE FACILITIES. INSTALL 1780 FEET OF 4 INCH POLY ALONG FIELDER ROAD AND ABANDON 1765 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF ARLINGTON WATER AND SANITARY SEWER RENEWAL PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 54 080.54090 2 RELOCATE FACILITIES. INSTALL 280 FEET OF 6 INCH POLY ALONG OLD BURLESON ROAD AND ABANDON 270 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN TARRANT COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 55 080.54112 16 RELOCATE FACILITIES. INSTALL 2300 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY AND ABANDON 1030 FEET OF 4 INCH, 265 FEET OF 2 INCH POLY, 180 FEET OF 4 INCH AND 550 FEET OF 2 INCH STEEL ALONG HICKORY STREET TO ACCOMMODATE CITY OF DENTON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 56 080.54160 6 RELOCATE FACILITIES. INSTALL 2080 FEET OF 12 INCH STEEL ALONG SUBLETT ROAD AND ABANDON 51 FEET OF 2 INCH, 570 FEET OF 4 INCH POLY, AND 1720 FEET OF 12 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 57 080.54166 4 RELOCATE FACILITIES. INSTALL 2200 FEET OF 4 INCH AND 1400 FEET OF 2 INCH POLY ALONG SOUTH COLLEGE AVENUE AND ABANDON 1700 FEET OF 4 INCH, 110 FEET OF 3 INCH, 900 FEET OF 2 INCH STEEL, 320 FEET OF 2 INCH, AND 60 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 58 080.54253 2 RELOCATE FACILITIES. INSTALL 3961 FEET OF 4 INCH POLY ALONG NORTHWEST PARKWAY AND ABANDON 2930 FEET OF 4 INCH STEEL, 1005 FEET OF 4 INCH, 392 FEET OF 3 INCH, AND 86 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 59 080.54264 17 RELOCATE FACILITIES. INSTALL 1023 FEET OF 4 INCH, 210 FEET OF 2 INCH POLY AND ABANDON 1023 FEET OF 4 INCH STEEL ALONG ANGLE AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 60 080.54270 22 RELOCATE FACILITIES. INSTALL 2715 FEET OF 4 INCH POLY AND ABANDON 2666 FEET OF 4 INCH CAST IRON ALONG ROBINSON STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 61 080.54273 1 RELOCATE FACILITIES. INSTALL 3458 FEET OF 6 INCH AND 140 FEET OF 2 INCH POLY ALONG OLD RANDOL MILL ROAD AND ABANDON 3236 FEET OF 6 INCH, 210 FEET OF 2 INCH STEEL AND 334 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 62 080.54287 1 RELOCATE FACILITIES. INSTALL 850 FEET OF 2 INCH POLY AND ABANDON 840 FEET OF 3 INCH STEEL ALONG CLARENDON TO ACCOMMODATE CITY OF COCKRELL HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS COCKRELL HILL SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 63 080.54291 5 RELOCATE FACILITIES. INSTALL 273 FEET OF 2 INCH , 244 FEET OF 4 INCH, 2040 FEET OF 6 INCH POLY AND ABANDON 224 FEET OF 2 INCH, 236 FEET OF 4 INCH, 1986 FEET OF 6 INCH POLY ALONG COLONY STREET TO ACCOMMODATE CITY OF CARROLLTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS THE COLONY SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 64 080.54428 10 RELOCATE FACILITIES. INSTALL 2285 FEET OF 4 INCH POLY ALONG WABASH AVENUE AND ABANDON 4124 FEET OF 4 INCH, 125 FEET OF 6 INCH STEEL, 125 FEET OF 6 INCH, AND 120 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 65 080.54854 1 RELOCATE FACILITIES. INSTALL 3093 FEET OF 6 INCH AND 1276 FEET OF 2 INCH POLY ALONG US 377 AND ABANDON 3000 FEET OF 2 INCH STEEL AND 160 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 66 080.54858 28 RELOCATE FACILITIES. INSTALL 2386 FEET OF 6 INCH, 350 FEET OF 4 INCH AND 1636 FEET OF 2 INCH POLY AND ABANDON 1520 FEET OF 2 INCH, 300 FEET OF 3 INCH STEEL AND 610 FEET OF 2 INCH POLY ALONG US 377 TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 67 080.54859 1 RELOCATE FACILITIES. INSTALL 650 FEET OF 6 INCH AND 200 FEET OF 4 INCH POLY AND ABANDON 650 FEET OF 6 INCH AND 200 FEET OF 4 INCH POLY ALONG EAST BROAD STREET TO ACCOMMODATE CITY OF MANSFIELD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. MTX Relocations Page 4 of 12 590 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION  PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE REIMBURSEMENT RECEIVED? YES/NO COMMENTS / ADDITIONAL INFORMATION RELATED TO THE AMOUNT IN COLUMN "COST" 68 080.55033 1 RELOCATE FACILITIES. INSTALL 374 FEET OF 2 INCH POLY AND ABANDON 337 FEET OF 2 INCH POLY ALONG THROCKMORTON TO ACCOMMODATE CITY OF ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 69 080.55060 82 RELOCATE FACILITIES. INSTALL 5175 FEET OF 2 INCH POLY AND ABANDON 3324 FEET OF 4 INCH STEEL, 350 FEET OF 4 INCH POLY AND 70 FEET OF 4 INCH CAST IRON ALONG BERKLEY PLACE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 70 080.55064 1 RELOCATE FACILITIES. INSTALL 1810 FEET OF 4 INCH AND 1010 FEET OF 2 INCH POLY AND ABANDON 680 FEET OF 2 INCH STEEL ALONG CHURCH STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 71 080.55147 1,456 RELOCATE FACILITIES. INSTALL 20 FEET OF 4 INCH, 10 FEET OF 6 INCH, AND 1575 FEET OF 8 INCH POLY AND ABANDON 1530 FEET OF 4 INCH POLY ALONG INTERSTATE HIGHWAY 30 TO ACCOMMODATE TXDOT HIGHWAY IMPROVEMENT PROJECT.ALL CUSTOMERS ROCKWALL RELOCATION OF FACILITIES APRIL NO $212,453.13 CREDITED IN 2018 TO ACCOUNT 101. REIMBURSEMENT COMPLETE. 72 080.55221 1 RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH AND 175 FEET OF 4 INCH POLY ALONG STAFFORD DRIVE AND ABANDON 50 FEET OF 1.25 INCH, 265 FEET OF 2 INCH AND 170 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 73 080.55304 86 RELOCATE FACILITIES. INSTALL 2725 FEET OF 4 INCH POLY ALONG SIX FLAGS ROAD AND ABANDON 50 FEET OF 2 INCH, 86 FEET OF 4 INCH POLY AND 53 FEET OF 3 INCH, AND 2537 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 74 080.55320 116 RELOCATE FACILITIES. INSTALL 3000 FEET OF 4 INCH POLY AND ABANDON 117 FEET OF 2 INCH, 1888 FEET OF 4 INCH STEEL AND 125 FEET OF 2 INCH, 25 FEET OF 4 INCH AND 20 FEET OF 6 INCH POLY ALONG FOREST STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 75 080.55351 106 RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH AND 3045 FEET OF 4 INCH POLY AND ABANDON 2487 FEET OF 2 INCH STEEL, 437 FEET OF 2 INCH, AND 180 FEET OF 4 INCH POLY ALONG PECAN STREET TO ACCOMMODATE THE CITY OF ROANOKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ROANOKE SYSTEM INTEGRITY OCTOBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 76 080.55422 2 RELOCATE FACILITIES. INSTALL 1360 FEET OF 2 INCH POLY ALONG ROSEHILL ROAD AND ABANDON 1360 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 77 080.55423 2 RELOCATE FACILITIES. INSTALL 840 FEET OF 4 INCH POLY ALONG LYONS ROAD AND ABANDON 810 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 78 080.55424 3 RELOCATE FACILITIES. INSTALL 680 FEET OF 4 INCH POLY ALONG FALLBROOK DRIVE AND ABANDON 675 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 79 080.55565 2 RELOCATE FACILITIES. INSTALL 2425 FEET OF 2 INCH POLY ALONG GARDENVIEW AND ABANDON 2486 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 80 080.55568 3 RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH, 1750 FEET OF 4 INCH, AND 100 FEET OF 8 INCH POLY ALONG HIGHLAND AND ABANDON 100 FEET OF 2 INCH, 2032 FEET OF 6 INCH, AND 294 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 81 080.55642 131 RELOCATE FACILITIES. INSTALL 5745 FEET OF 4 INCH POLY ALONG LOTUS AVENUE AND ABANDON 1800 FEET OF 6 INCH CAST IRON, 540 FEET OF 6 INCH, 580 FEET OF 3 INCH, AND 465 FEET OF 2 INCH STEEL, AND 185 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 82 080.55697 2 RELOCATE FACILITIES. INSTALL 450 FEET OF 6 INCH POLY ALONG PRESTON ROAD AND ABANDON 350 FEET OF 6 INCH POLY AND 100 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FRISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FRISCO SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 83 080.55923 2 RELOCATE FACILITIES. INSTALL 2186 FEET OF 2 INCH POLY AND (29) POLY SERVICES ALONG SYLVANIA AVENUE AND ABANDON (29) STEEL SERVICES AND 30 FEET OF 2 INCH CAST IRON TO ACCOMMODATE THE CITY OF FORT WORTH CITY PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 84 080.55926 15 RELOCATE FACILITIES. INSTALL 3114 FEET OF 4 INCH POLY AND ABANDON 3100 FEET OF 4 INCH STEEL ALONG JACQELINE ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. MTX Relocations Page 5 of 12 591 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION  PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE REIMBURSEMENT RECEIVED? YES/NO COMMENTS / ADDITIONAL INFORMATION RELATED TO THE AMOUNT IN COLUMN "COST" 85 080.55966 1 RELOCATE FACILITIES. INSTALL 900 FEET OF 6 INCH POLY ALONG RALPH HALL PARKWAY AND ABANDON 817 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 86 080.56105 379 RELOCATE FACILITIES. INSTALL 300 FEET OF 8 INCH POLY AND ABANDON 290 FEET OF 4 INCH POLY ALONG INTERSTATE HIGHWAY 30 TO ACCOMMODATE TXDOT HIGHWAY IMPROVEMENT PROJECT.ALL CUSTOMERS ROCKWALL RELOCATION OF FACILITIES APRIL NO $55,321.83 CREDITED IN 2018 TO ACCOUNT 101. REIMBURSEMENT COMPLETE. 87 080.56237 1 RELOCATE FACILITIES. INSTALL 620 FEET OF 2 INCH POLY ALONG SUNNYBROOK AND ABANDON 620 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 88 080.56251 5 RELOCATE FACILITIES. INSTALL 453 FEET OF 6 INCH POLY ALONG JIM CRYSTAL ROAD AND ABANDON 453 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 89 080.56410 2 RELOCATE FACILITIES. INSTALL 604 FEET OF 2 INCH POLY ALONG MOTLEY DRIVE AND ABANDON 604 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 90 080.56433 8 RELOCATE FACILITIES. INSTALL 945 FEET OF 4 INCH AND 163 FEET OF 2 INCH POLY ALONG BRENNAN AVENUE AND ABANDON 730 FEET OF 4 INCH, 25 FEET OF 2 INCH STEEL AND 206 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 91 080.56497 4 RELOCATE FACILITIES. INSTALL 680 FEET OF 8 INCH POLY ALONG CRESTVIEW DRIVE AND ABANDON 680 FEET OF 8 INCH STEEL AND 400 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 92 080.56571 5,660 RELOCATE FACILITIES. INSTALL 1500 FEET OF 6 INCH STEEL AND ABANDON 740 FEET OF 3 INCH STEEL AND 498 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF ALVARADO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ALVARADO SYSTEM INTEGRITY OCTOBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 93 080.56586 6 RELOCATE FACILITIES. INSTALL 2006 FEET OF 4 INCH POLY ALONG ROCKHILL ROAD AND ABANDON 1990 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 94 080.56662 73 RELOCATE FACILITIES. INSTALL 1785 FEET OF 6 INCH POLY AND ABANDON 1785 FEET OF 6 INCH STEEL IN HAYNES AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 95 080.56731 1 RELOCATE FACILITIES. INSTALL 60 FEET OF 2 INCH POLY ALONG MONTCLAIR PLACE AND ABANDON 4 FEET OF 2 INCH STEEL AND 66 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 96 080.56743 9 RELOCATE FACILITIES. INSTALL 2995 FEET OF 4 INCH POLY AND ABANDON 2074 FEET OF 4 INCH CAST IRON AND 694 FEET OF 4 INCH AND 200 FEET OF 2 INCH STEEL ALONG COVELLO AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 97 080.56928 1 RELOCATE FACILITIES. INSTALL 560 FEET OF 4 INCH POLY ALONG BAYLOR STREET AND ABANDON 52 FEET OF 2 INCH AND 351 FEET OF 4 INCH STEEL AND 148 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ENNIS SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 98 080.56974 1 RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY ALONG GREENBRIER ROAD AND ABANDON 764 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 99 080.56991 4 RELOCATE FACILITIES. INSTALL 1,500 FEET OF 2 INCH POLY ALONG ROE STREET AND ABANDON 1,500 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF WHITE SETTLEMENT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WHITE SETTLEMENT SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 100 080.56995 2 RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG VIRGINIA STREET AND ABANDON 885 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 101 080.57058 4 RELOCATE FACILITIES. INSTALL 1689 FEET OF 4 INCH POLY ALONG 4TH STREET AND ABANDON 1316 FEET OF 4 INCH CAST IRON AND 373 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 102 080.57069 4 RELOCATE FACILITIES. INSTALL 1800 FEET OF 4 INCH AND 2065 FEET OF 2 INCH POLY ALONG MOUNT VERNON AVENUE AND ABANDON 1050 FEET OF 6 INCH, 1330 FEET OF 2 INCH STEEL, 50 FEET OF 6 INCH, 630 FEET OF 4 INCH, 60 FEET OF 2 INCH POLY, 635 FEET OF 4 INCH, AND 750 OF 3 INCH CAST IRON, 1330 FEET OF 2 INCH STEEL AND 60 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. MTX Relocations Page 6 of 12 592 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION  PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE REIMBURSEMENT RECEIVED? YES/NO COMMENTS / ADDITIONAL INFORMATION RELATED TO THE AMOUNT IN COLUMN "COST" 103 080.57070 16 RELOCATE FACILITIES. INSTALL 1480 FEET OF 4 INCH POLY ALONG MILLETT ROAD,315 FEET OF 2 INCH POLY AND ABANDON 1480 FEET OF 4 INCH AND 315 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 104 080.57171 147 RELOCATE FACILITIES. INSTALL 2518 FEET OF 2 INCH, 569 FEET OF 4 INCH, 10 FEET OF 6 INCH AND 1255 FEET OF 8 INCH POLY ALONG MOUNT VERNON AVENUE AND ABANDON 370 FEET OF 2 INCH, 951 FEET OF 3 INCH, 500 FEET OF 4 INCH, 1613 FEET OF 6 INCH, 1050 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 105 080.57248 (2) RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY ALONG SHILOH ROAD AND ABANDON 350 FEET OF 4 INCH POLY TO ACCOMMODATE PLANO ROAD PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 106 080.57261 1,065 RELOCATE FACILITIES. INSTALL 5000 FEET OF 4 INCH AND 7500 FEET OF 2 INCH POLY ALONG FOURTH STREET AND ABANDON 4900 FEET OF 4 INCH, 6000 FEET OF 2 INCH AND 1500 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF KAUFMAN ROAD AND DRAINAGE IMPROVEMENTS PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS KAUFMAN SYSTEM INTEGRITY OCTOBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 107 080.57262 1 RELOCATE FACILITIES. INSTALL 580 FEET OF 4 INCH POLY ALONG BOB JONES ROAD AND ABANDON 575 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF SOUTHLAKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SOUTHLAKE SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 108 080.57282 70 RELOCATE FACILITIES. INSTALL 13 FEET OF 2 INCH, 6 FEET OF 4 INCH, AND 2347 FEET OF 6 INCH POLY ALONG FISH CREEK ROAD AND ABANDON 61 FEET OF 2 INCH, 55 FEET OF 4 INCH, AND 5280 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 109 080.57285 5 RELOCATE FACILITIES. INSTALL 635 FEET OF 2 INCH POLY AND ABANDON 618 FEET OF 2 INCH STEEL AND 49 FEET OF 2 INCH POLY ALONG ANDREW AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 110 080.57371 3 RELOCATE FACILITIES. INSTALL 1070 FEET OF 2 INCH POLY ALONG EVANS AVENUE AND ABANDON 330 FEET OF 6 INCH, 420 FEET OF 4 INCH CAST IRON, 50 FEET OF 6 INCH, AND 205 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 111 080.57388 1 RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY AND ABANDON 383 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 112 080.57419 1 RELOCATE FACILITIES. INSTALL 86 FEET OF 4 INCH POLY AND ABANDON 170 FEET OF 2 INCH, 132 FEET OF 3 INCH STEEL AND 80 FEET OF 2 INCH POLY AND ALONG PECAN STREET TO ACCOMMODATE CITY OF HUTTO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HUTTO SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 113 080.57529 1 RELOCATE FACILITIES. INSTALL 620 FEET OF 2 INCH POLY AND ABANDON 645 FEET OF 4 INCH STEEL ALONG LOCUST ROAD TO ACCOMMODATE THE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 114 080.57568 125 RELOCATE FACILITIES. INSTALL 2898 FEET OF 4 INCH POLY ALONG GALVEZ AND ABANDON 1607 FEET OF 4 INCH CAST IRON AND 1000 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 115 080.57580 4 RELOCATE FACILITIES. INSTALL 1124 FEET OF 2 INCH POLY AND ABANDON 464 FEET OF 2 INCH STEEL AND 646 FEET OF 2 INCH POLY ALONG ROBIN LANE TO ACCOMMODATE CITY OF BERTRAM STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BERTRAM SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 116 080.57615 14 RELOCATE FACILITIES. INSTALL (99) POLY SERVICES AND ABANDON (99) STEEL SERVICES ALONG CAPITAL STREET TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 117 080.57711 1 RELOCATE FACILITIES. INSTALL 2500 FEET OF 4 INCH POLY ALONG NATIONAL DRIVE AND ABANDON 2500 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ENNIS SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 118 080.57763 2 RELOCATE FACILITIES. INSTALL 897 FEET OF 4 INCH AND 2 FEET OF 6 INCH POLY AND ABANDON 564 FEET OF 4 INCH CAST IRON ALONG CARTWRIGHT AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 119 080.57824 271 RELOCATE FACILITIES. INSTALL 2064 FEET OF 24 INCH STEEL ALONG WHEATLAND ROAD AND ABANDON 1263 FEET OF 24 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 120 080.57852 4 RELOCATE FACILITIES. INSTALL 2456 FEET OF 2 INCH AND 3212 FEET OF 4 INCH POLY ALONG CHIMNEY HILL DRIVE AND ABANDON 903 FEET OF 2 INCH AND 2080 FEET OF 3 INCH STEEL AND 1371 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. MTX Relocations Page 7 of 12 593 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION  PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE REIMBURSEMENT RECEIVED? YES/NO COMMENTS / ADDITIONAL INFORMATION RELATED TO THE AMOUNT IN COLUMN "COST" 121 080.57959 1 RELOCATE FACILITIES. INSTALL 1283 FEET OF 2 INCH, 3 FEET OF 3 INCH AND 2688 FEET OF 4 INCH POLY ALONG LINDA LANE AND ABANDON 8 FEET OF 1.25 INCH, 1027 FEET OF 2 INCH, 2499 FEET OF 3 INCH AND 252 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 122 080.58052 12 RELOCATE FACILITIES. INSTALL 27 FEET OF 2 INCH POLY ALONG LONE STAR DRIVE AND ABANDON 546 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CEDAR PARK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CEDAR PARK SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 123 080.58113 1 RELOCATE FACILITIES. INSTALL 861 FEET OF 2 INCH POLY ALONG FOCH STREET AND ABANDON 970 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 124 080.58131 3 RELOCATE FACILITIES. INSTALL 87 FEET OF 2 INCH AND 3 FEET OF 4 INCH POLY ALONG JOMAR LANE AND ABANDON 81 FEET OF 2 INCH AND 9 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 125 080.58195 1 RELOCATE FACILITIES. INSTALL 296 FEET OF 6 INCH POLY ALONG MCDERMOTT ROAD AND ABANDON 264 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 126 080.58233 3 RELOCATE FACILITIES. INSTALL 20 FEET OF 2 INCH POLY ALONG CLIFF VIEW AND ABANDON 90 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 127 080.58320 3 RELOCATE FACILITIES. INSTALL 1173 FEET OF 2 INCH AND 212 FEET OF 4 INCH POLY ALONG ANNA DRIVE AND ABANDON 944 FEET OF 3 INCH STEEL AND 364 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF ALLEN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ALLEN SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 128 080.58452 9 RELOCATE FACILITIES. INSTALL (22) POLY SERVICES AND ABANDON (22) STEEL SERVICES ALONG LANGLEY AVENUE TO ACCOMMODATE CITY OF EVERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS EVERMAN SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 129 080.58469 33 RELOCATE FACILITIES. INSTALL 35 FEET OF 4 INCH POLY ALONG 2ND STREET AND ABANDON 4021 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 130 080.58494 1 RELOCATE FACILITIES. INSTALL 227 FEET OF 4 INCH POLY ALONG DOMINIK DRIVE AND ABANDON 227 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF COLLEGE STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 131 080.58587 1 RELOCATE FACILITIES. INSTALL 321 FEET OF 4 INCH POLY ALONG NORTHWOOD STREET AND ABANDON 321 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 132 080.58608 3 RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH POLY ALONG TWIGHLIGHT AND ABANDON 450 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 133 080.58646 4 RELOCATE FACILITIES. INSTALL 603 FEET OF 4 INCH POLY AND ABANDON 586 FEET OF 3 INCH STEEL AND 1221 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF EASTLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS EASTLAND SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 134 080.58669 4 RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH POLY AND ABANDON 113 FEET OF 2 INCH POLY ALONG BRANDYWINE STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 135 080.58723 5 RELOCATE FACILITIES. INSTALL 125 FEET OF 2 INCH POLY ALONG SAGEWOOD STREET AND ABANDON 120 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER NO NOT REIMBURSABLE PURSUANT TO FRANCHISE ORDINANCE. 136 080.64317 1,963 RELOCATE FACILITIES. INSTALL 353 FEET OF 4 INCH POLY AND ABANDON 340 FEET OF 4 INCH POLY MAIN ALONG SH 360 TO ACCOMMODATE CONSTRUCTION OF COMMERCIAL DRIVEWAY FOR AMERICAN AIRLINES FACILITY.ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES JANUARY YES $187,725.70 CREDITED IN 2019 TO ACCOUNT 101. $1,963.19 DEBITED IN 2022 TO ACCOUNT 101 FOR REFUND EXCESS PAYMENT. REIMBURSEMENT IS COMPLETE. 137 080.64629 (580) RELOCATE FACILITIES. INSTALL 1042 FEET OF 4 INCH POLY AND ABANDON 1037 FEET OF 4 INCH POLY ALONG US 87TO ACCOMMODATE TXDOT ROAD IMPROVEMENT PROJECT.ALL CUSTOMERS COMFORT RELOCATION OF FACILITIES JANUARY YES $301,962.33 CREDITED IN 2022 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 138 080.65787 8,169 RELOCATE FACILITIES. INSTALL 780 FEET OF 4 INCH AND 37 FEET OF 6 INCH POLY AND ABANDON 221 FEET OF 2 INCH STEEL, 287 FEET OF 2 INCH POLY, 268 FEET OF 3 INCH POLY AND 20 FEET OF 6 INCH POLY ALONG SOUTH BOUND FRONTAGE OF IH35 TO ACCOMMODATE TXDOT PROJECT.ALL CUSTOMERS GEORGETOWN RELOCATION OF FACILITIES APRIL YES $163,381.22 CREDITED IN 2021 TO ACCOUNT 101. $8,169.06 DEBITED IN 2022 TO ACCOUNT 101 AND CREDITED TO ACCOUNT 241 FOR CORRECTION OF FRANCHISE FEE. REIMBURSEMENT IS COMPLETE. MTX Relocations Page 8 of 12 594 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION  PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE REIMBURSEMENT RECEIVED? YES/NO COMMENTS / ADDITIONAL INFORMATION RELATED TO THE AMOUNT IN COLUMN "COST" 139 080.65968 78,409 RELOCATE FACILITIES. INSTALL 498 FEET OF 6 INCH POLY AND 229 FEET OF 4 INCH POLY AND ABANDON 503 FEET OF 6 INCH POLY AND 195 FEET OF 3 INCH POLY ALONG HIGHWAY I35 AND NORTHWEST BLVD TO ACCOMMODATE CITY OF GEORGETOWN STREET IMPROVEMENT PROJECT.ALL CUSTOMERS GEORGETOWN RELOCATION OF FACILITIES JULY YES $128,395.37 CREDITED IN 2021 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 140 080.66002 14,312 RELOCATE FACILITIES. INSTALL 424 FEET OF 4 INCH POLY AND ABANDON 176 FEET OF 4 INCH STEEL AND 239 FEET OF 4 INCH POLY TO ACCOMMODATE HEB CONSTRUCTION PROJECT.ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES FEBRUARY YES $108,732.23 CREDITED IN 2019 TO ACCOUNT 101. $14,311.50 DEBITED IN 2022 TO ACCOUNT 101 FOR REFUND EXCESS PAYMENT. REIMBURSEMENT IS COMPLETE. 141 080.66312 (2,649) RELOCATE FACILITIES. INSTALL 375 FEET OF 8 INCH POLY ALONG TXDOT SH 45 FRONTAGE ROAD AND ABANDON 375 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF PFLUGERVILLE WASTEWATER LINE PROJECT.ALL CUSTOMERS PFLUGERVILLE RELOCATION OF FACILITIES APRIL YES $52,982.25 CREDITED IN 2021 TO ACCOUNT 101. $2,649.11 CREDITED IN 2022 TO ACCOUNT 101 AND DEBITED TO ACCOUNT 241 FOR CORRECTION OF FRANCHISE FEE. REIMBURSEMENT IS COMPLETE. 142 080.67255 2,904 RELOCATE FACILITIES. INSTALL 230 FEET OF 2 INCH POLY ALONG AMESBURY DRIVE AND ABANDON 206 FEET OF 2 INCH POLY TO ACCOMMODATE MULTI-FAMILY CONSTRUCTION.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES MARCH YES $28,314.75 CREDITED IN 2021 TO ACCOUNT 101. $2,904.16 DEBITED IN 2022 TO ACCOUNT 101 FOR REFUND EXCESS PAYMENT. REIMBURSEMENT IS COMPLETE. 143 080.69631 3,395 RELOCATE FACILITIES. INSTALL 702 FEET OF 4 INCH POLY AND ABANDON 272 FEET OF 4 INCH POLY ALONG COIT ROAD.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES OCTOBER YES $163,807.66 CREDITED IN 2021 TO ACCOUNT 1010. THE COMPANY HAS EITHER PROVIDED, PREPARED, OR WILL PREPARE AN INVOICE TO OBTAIN REIMBURSEMENT, WHICH WILL BE CREDITED TO THE BOOKS AND RECORDS OF THE COMPANY IN FUTURE GRIP FILINGS. 144 080.69813 705 RELOCATE FACILITIES. INSTALL 120 FEET OF 3 INCH STEEL AND ABANDON 120 FEET OF 3 INCH STEEL ALONG LINE W4 IN DENTON COUNTY TO ACCOMODATE STORM SEWER PROJECT.ALL CUSTOMERS DENTON RELOCATION OF FACILITIES MARCH YES $165,524.77 CREDITED IN 2020 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 145 080.69934 5,994 RELOCATE FACILITIES. INSTALL 349 FEET OF 4 INCH POLY AND ABANDON 334 FEET OF 4 INCH POLY ALONG CITY LINE TO ACCOMMODATE DART SILVER LINE RAIL PROJECT.ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES DECEMBER YES $132,377.65 CREDITED IN 2021 TO ACCOUNT 1010. THE COMPANY HAS EITHER PROVIDED, PREPARED, OR WILL PREPARE AN INVOICE TO OBTAIN REIMBURSEMENT, WHICH WILL BE CREDITED TO THE BOOKS AND RECORDS OF THE COMPANY IN FUTURE GRIP FILINGS. 146 080.70137 4,936 RELOCATE FACILITIES: REPLACE METER INSTALLATIONS AND METER EQUIPMENT DUE TO RELOCATION OF RK HALL ASPHALT PLANT.ALL CUSTOMERS GREENVILLE RELOCATION OF FACILITIES APRIL YES $115,000.00 CREDITED IN 2020 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 147 080.70161 83,890 RELOCATE FACILITIES. INSTALL 251 FEET OF 2 INCH POLY AND ABANDON 243 FEET OF 2 INCH STEEL TO ACCOMMODATE DART RAIL PROJECT.ALL CUSTOMERS ADDISON RELOCATION OF FACILITIES OCTOBER YES $124,567.00 CREDITED IN 2021 TO ACCOUNT 1010. THE COMPANY HAS EITHER PROVIDED, PREPARED, OR WILL PREPARE AN INVOICE TO OBTAIN REIMBURSEMENT, WHICH WILL BE CREDITED TO THE BOOKS AND RECORDS OF THE COMPANY IN FUTURE GRIP FILINGS. 148 080.70162 4,512 RELOCATE FACILITIES. INSTALL 482 FEET IF 4 INCH POLY AND ABANDON 296 FEET OF 4 INCH POLY ALONG INDUSTRIAL TO ACCOMMODATE DART SILVE LINE RAIL PROJECT.ALL CUSTOMERS PLANO RELOCATION OF FACILITIES DECEMBER YES $160,149.17 CREDITED IN 2021 TO ACCOUNT 1010. THE COMPANY HAS EITHER PROVIDED, PREPARED, OR WILL PREPARE AN INVOICE TO OBTAIN REIMBURSEMENT, WHICH WILL BE CREDITED TO THE BOOKS AND RECORDS OF THE COMPANY IN FUTURE GRIP FILINGS. 149 080.70406 (164,925) INSTALL 6 INCH POLY ALONG ROSEDALE AND FOREST PARK IN FORT WORTH AND ABANDON 12 INCH STEEL TO ACCOMMODATE THIRD PARTY DAMAGE.ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES FEBRUARY YES $240,089.25 CREDITED IN 2021 TO ACCOUNT 101. $5,358.08 DEBITED IN 2022 TO ACCOUNT 101 FOR REFUND EXCESS PAYMENT. REIMBURSEMENT IS COMPLETE. 150 080.70444 (62,295) RELOCATE FACILITIES. INSTALL 935 FEET OF 20 INCH STEEL AND ABANDON 925 FEET OF 20 INCH STEEL ALONG LA PRADA DRIVE TO ACCOMMODATE TXDOT IMPROVEMENT PROJECT.ALL CUSTOMERS MESQUITE RELOCATION OF FACILITIES DECEMBER YES $1,312,820.26 CREDITED IN 2021 TO ACCOUNT 101. $76,031.80 CREDITED IN 2022 TO ACCOUNT 101 FOR RE- BILL. REIMBURSEMENT IS COMPLETE. 151 080.70478 17,317 RELOCATE FACILITIES. INSTALL 350 FEET OF 6 INCH POLY AND ABANDON 250 FEET OF 6 INCH POLY TO ACCOMMODATE CONSTRUCTION ON TELECOM LINE.ALL CUSTOMERS PLANO RELOCATION OF FACILITIES NOVEMBER YES $144,305.52 CREDITED IN 2021 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 152 080.70492 84,617 RELOCATE FACILITIES. INSTALL 492 FEET OF 2 INCH POLY ALONG PINYON TREE AND ABANDON 455 FEET OF 2 INCH AND 145 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES SEPTEMBER YES $206,093.87 CREDITED IN 2021 TO ACCOUNT 101. $84,616.72 DEBITED IN 2022 TO ACCOUNT 101 FOR REFUND EXCESS PAYMENT. REIMBURSEMENT IS COMPLETE. 153 080.70590 (96,432) RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY AND 780 FEET OF 2" POLY AND ABANDON 700 FEET OF 4 POLY TO ACCOMMODATE THE CONSTRUCTION OF SMU RESIDENTIAL.ALL CUSTOMERS UNIVERSITY PARK RELOCATION OF FACILITIES APRIL YES $96,432.43 CREDITED IN 2022 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. MTX Relocations Page 9 of 12 595 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION  PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE REIMBURSEMENT RECEIVED? YES/NO COMMENTS / ADDITIONAL INFORMATION RELATED TO THE AMOUNT IN COLUMN "COST" 154 080.70894 23,070 RELOCATE FACILITIES. INSTALL 5803 FEET OF 16 INCH STEEL LINE 01-1 AND ABANDON 4083 FEET OF 6 INCH STEEL TO ACCOMMODATE PRIVATE DEVELOPMENT PROJECT.ALL CUSTOMERS LANCASTER RELOCATION OF FACILITIES DECEMBER YES $1,289,859.00 CREDITED IN 2021 TO ACCOUNT 101. $172,508.48 CREDITED IN 2021 TO ACCOUNT 101 FOR RE- BILL. REIMBURSEMENT IS COMPLETE. 155 080.71129 (246,358) RELOCATE FACILITIES. INSTALL 275 FEET OF 2 INCH, 480 FEET OF 4 INCH, 1000 FEET OF 6 INCH AND 305 FEET OF 8 INCH POLY ALONG SKILLMAN STREET AND ABANDON 690 FEET OF 2 INCH AND 220 FEET OF 3 INCH POLY AND 1390 FEET OF 4 INCH STEEL TO ACCOMMODATE TXDOT PROJECT.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES JULY YES $635,520.33 CREDITED IN 2021 TO ACCOUNT 101. $246,755.30 CREDITED IN 2022 TO ACCOUNT 101 FOR RE- BILL. REIMBURSEMENT IS COMPLETE. 156 080.71255 178,373 RELOCATE FACILITIES. INSTALL 1769 FEET OF 20 INCH STEEL AND ABANDON 1759 FEET OF 20 INCH STEEL ALONG IH 635 TO ACCOMODATE TXDOT IH 635 IMPROVEMENTS PROJECT.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES DECEMBER YES $2,775,411.60 CREDITED IN 2021 TO ACCOUNT 101. $165,200.53 DEBITED IN 2022 TO ACCOUNT 101 FOR REFUND EXCESS PAYMENT. REIMBURSEMENT IS COMPLETE. 157 080.71571 416 RELOCATE FACILITIES. INSTALL 625 FEET OF 4 INCH POLY AND ABANDON 375 FEET OF 3 INCH POLY ALONG WEST PARK COURT TO ACCOMMODATE CONSTRUCTION OF A MEDICAL CENTER.ALL CUSTOMERS EULESS RELOCATION OF FACILITIES SEPTEMBER YES $77,753.00 CREDITED IN 2021 TO ACCOUNT 101. $21,324.83 CREDITED IN 2022 TO ACCOUNT 101 FOR RE- BILL. REIMBURSEMENT IS COMPLETE. 158 080.71674 254 RELOCATE FACILITIES. INSTALL 500 FEET OF 4 INCH POLY AND ABANDON 500 FEET OF 4 INCH POLY ALONG STREETS OF EDWARDS CHURCH. DEVELOPER INSTALLED FACILITIES.ALL CUSTOMERS MESQUITE RELOCATION OF FACILITIES JUNE NO PROJECT IS NOT REIMBURSABLE 159 080.71737 25,901 RELOCATE FACILITIES. INSTALL 447 FEET OF 4 INCH POLY ALONG ESTATE LANE AND ABANDON 422 FEET OF 3 INCH POLY TO ACCOMMODATE TXDOT PROJECT.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES AUGUST YES $203,421.34 CREDITED IN 2021 TO ACCOUNT 101. $25,264.27 DEBITED IN 2022 TO ACCOUNT 101 FOR REFUND EXCESS PAYMENT. REIMBURSEMENT IS COMPLETE. 160 080.71755 (1,974,925) RELOCATE FACILITIES. INSTALL 399 FEET OF 10 INCH STEEL AND 1996 FEET OF 6 INCH POLY, 159 FT OF 4 INCH POLY AND 145 FEET OF 2 INCH POLY ALONG I-35 RELOCATION AND ABANDON 403 FEET OF 10 INCH STEEL AND 2633 FEET OF POLY TO ACCOMMODATE TXDOT IMPROVEMENT PROJECT.ALL CUSTOMERS GAINESVILLE RELOCATION OF FACILITIES DECEMBER YES $1,981,606.86 CREDITED IN 2022 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 161 080.71969 (51,222) RELOCATE FACILITIES. INSTALL TWO 6 INCH ISOLATION VALVE, 10 INCH MAINLINE VALAVE, 80 FEET OF 16 INCH STEEL AND ABANDON 80 FEET OF 16 INCH STEEL ALONG THE STREETS OF ARLINGTON.ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES MAY NO PROJECT IS NOT REIMBURSABLE 162 080.71978 (16,193) RELOCATE FACILITES. INSTALL 103 FEET OF 4 INCH POLY AND ABANDON 101 FEET OF 3 INCH POLY ALONG GALLERIA DRIVE TO ACCOMODATE UNION PACIFIC RAILROAD EXTENSION PROJECT.ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES MARCH YES $149,352.89 CREDITED IN 2021 TO ACCOUNT 101. $11,710.93 DEBITED IN 2021 TO ACCOUNT 101 FOR REFUND EXCESS PAYMENT. REIMBURSEMENT IS COMPLETE. 163 080.72074 9,047 RELOCATE FACILITIES. INSTALL 277 FEET OF 4 INCH POLY AND 419 FEET OF 6 INCH POLY ALONG JUPITER ROAD AND KINGSLEY ROAD AND ABANDON 1327 FEET OF 8 INCH STEEL TO ACCOMMODATE TXDOT IMPROVEMENT PROJECT.ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES DECEMBER YES $279,828.01 CREDITED IN 2021 TO ACCOUNT 101. $3,720.33 DEBITED IN 2022 TO ACCOUNT 101 FOR REFUND EXCESS PAYMENT. REIMBURSEMENT IS COMPLETE. 164 080.72248 19,590 RELOCATE FACILITIES. ABANDON 250 FEET OF 3 INCH STEEL ALONG COMMONWEATH DRIVE TO ACCOMODATE DEVELOPMENT PROJECT.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES JULY YES $38,561.45 CREDITED IN 2021 TO ACCOUNT 101. $19,616.10 DEBITED IN 2022 TO ACCOUNT 101 FOR REFUND EXCESS PAYMENT. REIMBURSEMENT IS COMPLETE. 165 080.72336 66,877 RELOCATE FACILITIES. INSTALL 750 OF 6 INCH POLY AND AND ABANDON 740 FEET OF 6 INCH POLY TO ACCOMMODATE SANITARY SEWER LINE.ALL CUSTOMERS HASLET RELOCATION OF FACILITIES OCTOBER YES $205,474.41 CREDITED IN 2022 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 166 080.72403 (90,073) RELOCATE FACILITIES. INSTALL 320 FEET OF 6 INCH POLY AND ABANDON 320 FEET OF 6 INCH STEEL TO ACCOMMODATE NEW CEFCO.ALL CUSTOMERS PALESTINE RELOCATION OF FACILITIES JUNE YES $263,629.85 CREDITED IN 2021 TO ACCOUNT 101. $65,640.38 CREDITED IN 2022 TO ACCOUNT 101 FOR RE- BILL. REIMBURSEMENT IS COMPLETE. 167 080.72480 (293,122) RELOCATE FACILITIES. INSTALL 292 FEET OF 4 INCH STEEL AND ABANDON 284 FEET OF 4 INCH STEEL ALONG LINE O29 TO ACCOMMODATE TXDOT PROJECT.ALL CUSTOMERS CRANDALL RELOCATION OF FACILITIES AUGUST NO $305,539.98 CREDITED IN 2022 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 168 080.72550 (4,906) RELOCATE FACILITIES. INSTALL 172 FEET OF 4 INCH POLY AND ABANDON 172 FEET OF 4 INCH POLY ALONG FORD LANE TO ACCOMMODATE AAON.ALL CUSTOMERS LONGVIEW RELOCATION OF FACILITIES FEBRUARY YES $165,223.54 CREDITED IN 2021 TO ACCOUNT 101. $4,660.42 CREDITED IN 2022 TO ACCOUNT 101 FOR RE-BILL. REIMBURSEMENT IS COMPLETE. 169 080.72811 260 RELOCATION FACILITIES: INSTALL TAP AND RISER ALONG LINE RFB IN TAYLOR COUNTY TO ACCOMMODATE A RELOCATED MEASURING STATION.ALL CUSTOMERS TUSCOLA RELOCATION OF FACILITIES APRIL NO PROJECT IS NOT REIMBURSABLE 170 080.72871 (4,803) RELOCATE FACILITIES. INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 4 INCH POLY ALONG FREDERICK SQUARE TO ACCOMMODATE A DEVELOPER PROJECT.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES MARCH YES $88,372.80 CREDITED IN 2021 TO ACCOUNT 101. $8,709.42 CREDITED IN 2022 TO ACCOUNT 101 FOR RE-BILL. REIMBURSEMENT IS COMPLETE. 171 080.73430 223 RELOCATE FACILITIES. INSTALL 40 FEET OF 6 INCH POLY AND ABANDON 40 FEET OF 6 INCH POLY ALONG HICKIX ROAD.ALL CUSTOMERS ROWLETT RELOCATION OF FACILITIES SEPTEMBER NO PROJECT IS NOT REIMBURSABLE 172 080.73506 133 RELOCATE FACILITIES. INSTALL 512 FEET OF 4 INCH POLY AND ABANDON 515 FEET OF 4 INCH POLY. DEVELOPER INSTALLED FACILITIES.ALL CUSTOMERS PROSPER RELOCATION OF FACILITIES APRIL NO PROJECT IS NOT REIMBURSABLE MTX Relocations Page 10 of 12 596 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION  PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE REIMBURSEMENT RECEIVED? YES/NO COMMENTS / ADDITIONAL INFORMATION RELATED TO THE AMOUNT IN COLUMN "COST" 173 080.73596 (43,324) RELOCATE FACILITIES. INSTALL 1500 FEET OF 6 INCH STEEL AND ABANDON 900 FEET OF 6 INCH STEEL ALONG NORTH OF VICTORY CIRCLE TO ACCOMMODATE A DEVELOPER PROJECT.ALL CUSTOMERS NORTHLAKE RELOCATION OF FACILITIES SEPTEMBER YES $535,357.00 CREDITED IN 2021 TO ACCOUNT 101. $56,273.48 CREDITED IN 2022 TO ACCOUNT 101 FOR RE- BILL. REIMBURSEMENT IS COMPLETE. 174 080.73673 5,757 RELOCATE FACILITIES. INSTALL 1500 FEET OF 4 INCH POLY ALONG 38TH STREET.ALL CUSTOMERS KILLEEN RELOCATION OF FACILITIES MARCH NO THE COMPANY HAS EITHER PROVIDED, PREPARED, OR WILL PREPARE AN INVOICE TO OBTAIN REIMBURSEMENT, WHICH WILL BE CREDITED TO THE BOOKS AND RECORDS OF THE COMPANY IN FUTURE GRIP FILINGS. 175 080.74022 (97,755) RELOCATE FACILITIES. INSTALL 370 FEET OF 4 INCH, 340 FEET OF 4 INCH POLY ALONG GARZA STREET AND ABANDON 320 FEET OF 3 INCH STEEL, 238 FEET OF 3 INCH STEEL IN ACCORDANCE WTIH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS TUSCOLA RELOCATION OF FACILITIES JULY YES $109,598.10 CREDITED IN 2021 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 176 080.74505 35,619 RELOCATE FACILITIES. INSTALL 50 FEET OF 4 INCH POLY AND ABANDON 50 FEET OF 4 INCH POLY ALONG GREENVILLE AVENUE TO ACCOMMODATE DEVELOPER INSTALLED FACILITY.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES APRIL YES $57,606.10 CREDITED IN 2021 TO ACCOUNT 106. REIMBURSEMENT IS COMPLETE. 177 080.74807 13,499 RELOCATE FACILITIES. INSTALL 22 FEET OF 6 INCH POLY ALONG LAKEWOOD DRIVE AND ABANDON 20 FEET OF 6 INCH POLY TO ACCOMODATE DEVELOPER FACILITIES.ALL CUSTOMERS BURLESON RELOCATION OF FACILITIES MARCH YES $20,991.01 CREDITED IN 2021 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 178 080.75066 807 RELOCATE FACILITIES. INSTALL 131 FEET OF 2 INCH POLY ALONG WESTBOROUGH LANE AND ABANDON 125 FEET OF 2 INCH POLY TO ACCOMODATE DEVELOPER FACILITIES.ALL CUSTOMERS LEANDER RELOCATION OF FACILITIES JUNE NO PROJECT IS NOT REIMBURSABLE 179 080.75461 (57,515) RELOCATE FACILITIES. INSTALL 180 FEET OF 4 INCH POLY AND ABANDON 253 FEET OF 2 INCH STEEL ALONG 6TH STREET TO ACCOMMODATE NEW HOTEL.ALL CUSTOMERS WACO RELOCATION OF FACILITIES AUGUST YES $60,453.74 CREDITED IN 2022 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 180 080.76794 42,881 RELOCATE FACILITIES. INSTALL 330 FEET OF 6 INCH POLY ALONG LIVE OAK STREET IN COMMERCE AND ABANDON 330 FEET OF 6 INCH STEEL. DEVELOPER INSTALLED FACILITIES.ALL CUSTOMERS COMMERCE RELOCATION OF FACILITIES DECEMBER NO PROJECT IS NOT REIMBURSABLE 181 080.76862 138,847 INSTALL 200 FEET OF 12 INCH STEEL AND ABANDON 200 FEET OF 12 INCH STEEL ALONG FM 1417 IN SHERMAN, GRAYSON COUNTY.ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES DECEMBER NO $255,291.44 CREDITED IN 2022 TO ACCOUNT 1010. THE COMPANY HAS EITHER PROVIDED, PREPARED, OR WILL PREPARE AN INVOICE TO OBTAIN REIMBURSEMENT, WHICH WILL BE CREDITED TO THE BOOKS AND RECORDS OF THE COMPANY IN FUTURE GRIP FILINGS. 182 080.77669 309,297 INSTALL 184 FEET OF 12 INCH STEEL AND ABANDON 132 FEET OF 8 INCH STEEL ALONG THE STREETS OF UNIVERSITY OF TEXAS-DALLAS, RICHARDSON, DALLAS COUNTY.ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES DECEMBER NO $157,019.33 CREDITED IN 2022 TO ACCOUNT 1010. THE COMPANY HAS EITHER PROVIDED, PREPARED, OR WILL PREPARE AN INVOICE TO OBTAIN REIMBURSEMENT, WHICH WILL BE CREDITED TO THE BOOKS AND RECORDS OF THE COMPANY IN FUTURE GRIP FILINGS. 183 080.77749 108,392 RELOCATE FACILITIES. INSTALL 760 FEET OF 6 INCH POLY ALONG STATE HIGHWAY 6 IN COLLEGE STATION. DEVELOPER INSTALLED FACILITIES.ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES DECEMBER NO THE COMPANY HAS EITHER PROVIDED, PREPARED, OR WILL PREPARE AN INVOICE TO OBTAIN REIMBURSEMENT, WHICH WILL BE CREDITED TO THE BOOKS AND RECORDS OF THE COMPANY IN FUTURE GRIP FILINGS. 184 080.77786 (21,055) INSTALL 150 FEET OF 2 INCH POLY AND ABANDON 150 FEET OF 2 INCH STEEL ALONG FM 1033 NORTH OF US 287 IN TXDOT ROAD RIGHT OF WAY IN KIRKLAND, CHILDRESS COUNTY.ALL CUSTOMERS KIRKLAND RELOCATION OF FACILITIES DECEMBER YES $52,201.91 CREDITED IN 2022 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 185 080.77961 3,057 RELOCATE FACILITIES. INSTALL 35 FEET OF 4 INCH POLY ALONG THE STREETS OF BRIDGEPORT.ALL CUSTOMERS BRIDGEPORT RELOCATION OF FACILITIES OCTOBER YES $13,417.79 CREDITED IN 2022 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 186 080.77972 (5,816) RELOCATE FACILITIES. INSTALL 680 FEET OF 4 INCH POLY ALONG SOUTH OAKES STREET IN SAN ANGELO AND ABANDON 535 FEET OF 4 INCH POLY AND 100 FEET OF 4 INCH STEEL.ALL CUSTOMERS SAN ANGELO RELOCATION OF FACILITIES DECEMBER YES $135,443.94 CREDITED IN 2022 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 187 080.78001 244,501 RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG CINNABAR AND SYMPHONY IN DALLAS AND ABANDON 100 FEET OF 4 INCH POLY.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES DECEMBER NO PROJECT IS NOT REIMBURSABLE 188 080.78026 39,645 RELOCATE FACILITIES. INSTALL 384 FEET OF 2 INCH POLY ALONG MORNING GLORY DRIVE IN FREDERICKSBURG.ALL CUSTOMERS FREDERICKSBURG RELOCATION OF FACILITIES OCTOBER NO PROJECT IS NOT REIMBURSABLE 189 080.78104 24,080 RELOCATE FACILITIES. INSTALL 755 FEET OF 4 INCH POLY ALONG NORTH COLLEGE AVENUE AND ABANDON 300 FEET OF 4 INCH STEEL AND 300 FEET OF 2 INCH POLY IN SNYDER, SCURRY COUNTY.ALL CUSTOMERS SNYDER RELOCATION OF FACILITIES DECEMBER NO $84,581.36 CREDITED IN 2022 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 190 080.78131 (12,782) RELOCATE FACILITIES. INSTALL 160 FEET OF 4 INCH POLY ALONG WOODARD AVENUE IN CLEBURNE AND ABANDON 160 FEET OF 4 INCH POLY.ALL CUSTOMERS CLEBURNE RELOCATION OF FACILITIES DECEMBER NO $56,921.78 CREDITED IN 2022 TO ACCOUNT 1010. THE COMPANY HAS EITHER PROVIDED, PREPARED, OR WILL PREPARE AN INVOICE TO OBTAIN REIMBURSEMENT, WHICH WILL BE CREDITED TO THE BOOKS AND RECORDS OF THE COMPANY IN FUTURE GRIP FILINGS. MTX Relocations Page 11 of 12 597 Item 10. ATMOS ENERGY CORP., MID‐TEX DIVISION  PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022 LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 CUSTOMERS BENEFITED LOCATION PURPOSE OF PROJECT DATE PLACED IN GAS PLANT IN SERVICE REIMBURSEMENT RECEIVED? YES/NO COMMENTS / ADDITIONAL INFORMATION RELATED TO THE AMOUNT IN COLUMN "COST" 191 080.78205 (12,670) RELOCATE FACILITIES. INSTALL 1,550 FEET OF 2 INCH POLY ALONG BOURLAND LANE IN WICHITA FALLS.ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES NOVEMBER YES $128,212.68 CREDITED IN 2022 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 192 080.78226 5,278 RELOCATE FACILITIES. INSTALL 7 .75 INCH SERVICE LINES ALONG CROSS BEND ROAD AND KNOB HILL IN PLANO AND ABANON 7 .75 INCH SERVICE LINES TO ACCOMMODATE THE CITY OF PLANO'S INSTALLATION OF A SCREENING WALL.ALL CUSTOMERS PLANO RELOCATION OF FACILITIES DECEMBER YES $28,718.57 CREDITED IN 2022 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 193 080.78247 (1,715) RELOCATE FACILITIES. INSTALL 25 FEET OF 6 INCH POLY ALONG SOUTH MAIN STREET IN MANSFIELD AND ABANDON 15 FEET OF 6 INCH POLY.ALL CUSTOMERS MANSFIELD RELOCATION OF FACILITIES DECEMBER YES $40,006.58 CREDITED IN 2022 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 194 080.78384 (331,795) INSTALL 7,400 FEET OF 4 INCH AND 50 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION AND ABANDON 13 FEET OF 4 INCH AND 8 FEET OF 2 INCH POLY ALONG THE STREETS OF WICHITA FALLS, WICHITA COUNTY.ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES DECEMBER NO $1,173,782.00 CREDITED IN 2022 TO ACCOUNT 1010. THE COMPANY HAS EITHER PROVIDED, PREPARED, OR WILL PREPARE AN INVOICE TO OBTAIN REIMBURSEMENT, WHICH WILL BE CREDITED TO THE BOOKS AND RECORDS OF THE COMPANY IN FUTURE GRIP FILINGS. 195 080.78386 3,112 RELOCATE FACILITIES. INSTALL 1,200 FEET OF 4 INCH POLY ALONG FM 548 IN FORNEY AND ABANDON 1,400 FEET OF 4 INCH POLY. DEVELOPER INSTALLED FACILITIES.ALL CUSTOMERS FORNEY RELOCATION OF FACILITIES DECEMBER NO PROJECT IS NOT REIMBURSABLE 196 080.78399 7,376 INSTALL 2,100 FEET OF 4 INCH POLY AND ABANDON 345 FEET OF 4 INCH POLY ALONG THE STREETS OF ABILENE, TAYLOR COUNTY.ALL CUSTOMERS ABILENE RELOCATION OF FACILITIES DECEMBER NO $59,161.00 CREDITED IN 2022 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 197 080.78415 (7,158) RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH POLY ALONG CABELA DRIVE IN FORT WORTH AND ABANDON 50 FEET OF 6 INCH POLY TO ACCOMMODATE ONCOR MANHOLE INSTALLATION.ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES DECEMBER YES $63,445.75 CREDITED IN 2022 TO ACCOUNT 101. REIMBURSEMENT IS COMPLETE. 198 080.78416 (39,086) RELOCATE FACILITIES. INSTALL 100 FEET OF 8 INCH POLY ALONG WASHINGTON STREET AND COLUMBUS AVENUE IN WACO, MCLENNAN COUNTY AND ABANDON 100 FEET OF 8 INCH STEEL.ALL CUSTOMERS WACO RELOCATION OF FACILITIES DECEMBER NO $251,185.70 CREDITED IN 2022 TO ACCOUNT 1010. THE COMPANY HAS EITHER PROVIDED, PREPARED, OR WILL PREPARE AN INVOICE TO OBTAIN REIMBURSEMENT, WHICH WILL BE CREDITED TO THE BOOKS AND RECORDS OF THE COMPANY IN FUTURE GRIP FILINGS. 199 080.78526 (71,416) RELOCATE FACILITIES. INSTALL 700 FEET OF 4 INCH POLY ALONG PARK STREET AND CORSICANA HIGHWAY IN HILLSBORO AND ABANDON 335 FEET OF 3 INCH STEEL.ALL CUSTOMERS HILLSBORO RELOCATION OF FACILITIES DECEMBER NO $198,426.50 CREDITED IN 2022 TO ACCOUNT 1010. THE COMPANY HAS EITHER PROVIDED, PREPARED, OR WILL PREPARE AN INVOICE TO OBTAIN REIMBURSEMENT, WHICH WILL BE CREDITED TO THE BOOKS AND RECORDS OF THE COMPANY IN FUTURE GRIP FILINGS. 200 080.78586 23,087 RELOCATE FACILITIES. INSTALL 135 FEET OF 2 INCH POLY ALONG HIGHWAY 82 AND TEXOMA PARKWAY IN SHERMAN AND ABANDON 2 INCH STEEL RISER AND DOUBLE METER LOOP.ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES DECEMBER NO PROJECT IS NOT REIMBURSABLE 201 080.78595 7,583 RELOCATE FACILITIES. INSTALL 275 FEET OF 2 INCH POLY ALONG ENTERPRISE WAY IN GREENVILLE AND ABANDON 17 FEET OF 2 INCH POLY. DEVELOPER INSTALLED FACILITIES.ALL CUSTOMERS GREENVILLE RELOCATION OF FACILITIES DECEMBER NO PROJECT IS NOT REIMBURSABLE 202 080.78983 82,252 INSTALL 418 FEET OF 2 INCH POLY AND ABANDON 368 FEET OF 2 INCH STEEL AND 50 FEET OF 2 INCH POLY IN ROCHESTER, HASKELL COUNTY.ALL CUSTOMERS ROCHESTER RELOCATION OF FACILITIES DECEMBER NO PROJECT IS NOT REIMBURSABLE 203 080.79000 252,247 RELOCATE FACILITIES. INSTALL 500 FEET OF 8 INCH POLY TO BE ROAD RIGHT OF WAY AT WINDING MEADOWS AND CANYON MAPLE ROAD AND ABANDON 456 FEET OF 8 INCH POLY IN NORTHLAKE, DENTON COUNTY.ALL CUSTOMERS NORTHLAKE RELOCATION OF FACILITIES DECEMBER NO PROJECT IS NOT REIMBURSABLE 204 080.79288 846 INSTALL 235 FEET OF 4 INCH POLY AND ABANDON 235 FEET OF 4 INCH POLY ALONG THE STREETS OF GREENWAY SUBDIVISION IN CELINA, COLLIN COUNTY.ALL CUSTOMERS CELINA RELOCATION OF FACILITIES DECEMBER NO PROJECT IS NOT REIMBURSABLE MTX Relocations Page 12 of 12 598 Item 10. 599 Item 10. 600 Item 10. 601 Item 10.