03/06/2023-CC-Agenda Packet-RegularCITY COUNCIL
MEETING AGENDA
MARCH 06, 2023, 6:00 PM
CITY COUNCIL REGULAR MEETING
HISTORIC CHURCH BUILDING - 403 N 7TH STREET, SANGER, TEXAS
CALL THE WORK SESSION TO ORDER AND ESTABLISH A QUORUM
EXECUTIVE SESSION
Pursuant to the Open Meetings Act, Chapter 551, the City Council Will Meet in a
Closed Executive Session in Accordance with the Texas Government Code:
Section 551.072. DELIBERATION REGARDING REAL PROPERTY
A. For deliberations regarding the purchase, exchange, lease, or value of real property if
deliberation in an open meeting would have a detrimental effect on the position of the
governmental body in negotiations with a third person specifically, Michael Riley, Laura Riley,
and J. Mike Riley Ranch Properties, LLC, (collectively the "Owner").
B. For deliberations regarding the purchase, exchange, lease, or value of real property if
deliberation in an open meeting would have a detrimental effect on the position of the
governmental body in negotiations with a third person specifically, 201 Bolivar Street, Sanger,
Texas 76266.
RECONVENE INTO WORK SESSION
Reconvene into the Work Session. Any necessary action will be taken during the Regular
Session.
OVERVIEW OF ITEMS ON THE REGULAR AGENDA
ADJOURN THE WORK SESSION
The Regular Meeting will begin following the Work Session
but not earlier than 7:00 p.m.
CALL THE REGULAR MEETING TO ORDER AND ESTABLISH A QUORUM
INVOCATION AND PLEDGE
1
CITIZENS COMMENTS
This is an opportunity for citizens to address the Council on any matter. Comments related to
public hearings will be heard when the specific hearing begins. Citizens are allowed 3 minutes
to speak. Each speaker must complete the Speaker’s Form and include the topic(s) to be
presented. Citizens who wish to address the Council with regard to matters on the agenda will
be received at the time the item is considered. The Council is not allowed to converse,
deliberate or take action on any matter presented during citizen input.
REPORTS
Staff Reports are for discussion only. No action may be taken on items listed under this portion
of the agenda.
1. Presentation by Kimley-Horn on potential design options for the IH-35 corridor.
CONSENT AGENDA
All items on the Consent Agenda will be acted upon by one vote without being discussed
separately unless requested by a Councilmember to remove the item(s) for additional
discussion. Any items removed from the Consent Agenda will be taken up for individual
consideration.
2. Consideration and possible action on the minutes from the February 21, 2023,
meeting.
3. Consideration and possible action on authorizing staff to issue a Request for
Qualifications (RFQ) for professional services to perform a Housing Study.
PUBLIC HEARING ITEMS
4. Conduct a public hearing on a request for the Replat of Lot 2, of the IESI Industrial
Park, being 2.993 acres located within the City of Sanger, generally located along the
north side of Utility Road approximately 1464 feet east of the intersection of North
Stemmons Frwy and Utility Road.
5. Conduct a public hearing regarding amending Chapter 13 Utilities, by adding Article
13.2800 Municipal Setting Designation, Sections 13.2801 Definitions, 13.2802 Use of
Groundwater in MSD Areas Prohibited, 13.2803 Application for City Council Approval of
MSD, 13.2804 Staff Review, 13.2805 Notice of Public Meeting, 13.2806 Public Meeting,
13.2807 City Council Public Hearing, 13.2808 Limitation on Reapplication, and 13.2809
Additional Provisions, Enforcement, and Penalties.
ACTION ITEMS
6. Consideration and possible action on a request for the Replat of Lot 2, of the IESI
Industrial Park, being 2.993 acres located within the City of Sanger, generally located
along the north side of Utility Road approximately 1464 feet east of the intersection of
North Stemmons Frwy and Utility Road.
2
7. Consideration and possible action on Ordinance No 03-04-23 amending Chapter 13
Utilities, by adding Article 13.2800 Municipal Setting Designation, Sections 13.2801
Definitions, 13.2802 Use of Groundwater in MSD Areas Prohibited, 13.2803 Application
for City Council Approval of MSD, 13.2804 Staff Review, 13.2805 Notice of Public
Meeting, 13.2806 Public Meeting, 13.2807 City Council Public Hearing, 13.2808
Limitation on Reapplication, and 13.2809 Additional Provisions, Enforcement, and
Penalties.
8. Consideration and possible action on the Final Plat of the Mo Addition, being 38.16
acres, located in the City of Sanger’s ETJ, and generally located on the south side of
FM 455, approximately 1961 feet west of the intersection of FM 455 and Creekview
Road.
9. Consideration and possible action on the Purchase and Sales Agreement for Lot 2R and
3R, Block A, Sanger Industrial Addition, Lots 1R, 2R & 3R, a Subdivision in Denton,
County, Texas.
FUTURE AGENDA ITEMS
The purpose of this item is to allow the Mayor and Councilmembers to bring forward items they
wish to discuss at a future meeting, A Councilmember may inquire about a subject for which
notice has not been given. A statement of specific factual information or the recitation of
existing policy may be given. Any deliberation shall be limited to a proposal to place the subject
on an agenda for a subsequent meeting. Items may be placed on a future meeting agenda with
a consensus of the Council or at the call of the Mayor.
INFORMATIONAL ITEMS
Information Items are for informational purposes only. No action may be taken on items listed
under this portion of the agenda.
10. Atmos Energy 2022 Interim Rate Adjustment
EXECUTIVE SESSION
Pursuant to the Open Meetings Act, Chapter 551, the City Council Will Meet in a Closed
Executive Session in Accordance with the Texas Government Code:
Section 551.072. DELIBERATION REGARDING REAL PROPERTY
A. For deliberations regarding the purchase, exchange, lease, or value of real property if
deliberation in an open meeting would have a detrimental effect on the position of the
governmental body in negotiations with a third person specifically, Michael Riley, Laura Riley,
and J. Mike Riley Ranch Properties, LLC, (collectively the "Owner").
B. For deliberations regarding the purchase, exchange, lease, or value of real property if
deliberation in an open meeting would have a detrimental effect on the position of the
governmental body in negotiations with a third person specifically, 201 Bolivar Street, Sanger,
Texas 76266.
3
RECONVENE INTO REGULAR SESSION
Reconvene into Regular Session and take any action deemed necessary as a result of Executive
Session.
ADJOURN
NOTE: The City Council reserves the right to adjourn into Executive Session as authorized by
Texas Government Code, Section 551.001, et seq. (The Texas Open Meetings Act) on any item
on its open meeting agenda in accordance with the Texas Open Meetings Act, including,
without limitation Sections 551.071-551.087 of the Texas Open Meetings Act.
CERTIFICATION
I certify that a copy of this meeting notice was posted on the bulletin board at City Hall that is
readily accessible to the general public at all times and was posted on the City of Sanger
website on March 1, 2023, at 4:30 PM.
/s/Kelly Edwards
Kelly Edwards, City Secretary
The Historical Church is wheelchair accessible. Request for additional accommodations or sign
interpretation or other special assistance for disabled attendees must be requested 48 hours
prior to the meeting by contacting the City Secretary’s Office at 940.458.7930.
4
CITY COUNCIL COMMUNICATION
DATE: March 6, 2023
FROM: Kelly Edwards, City Secretary
AGENDA ITEM: Consideration and possible action on the minutes from the February 21, 2023,
meeting.
SUMMARY:
N/A
FISCAL INFORMATION:
Budgeted: N/A Amount: $0.00 GL Account: N/A
RECOMMENDED MOTION OR ACTION:
Approve the minutes from the February 21, 2023, meeting.
ATTACHMENTS:
02/21/2023 City Council minutes
5
Item 2.
City Council Minutes 02-21-2023
Page 1 of 5
CITY COUNCIL
MEETING MINUTES
FEBRUARY 21, 2023, 6:00 PM
CITY COUNCIL REGULAR MEETING
HISTORIC CHURCH BUILDING - 403 N 7TH STREET, SANGER, TEXAS
CALL THE WORK SESSION TO ORDER AND ESTABLISH A QUORUM
Mayor Muir called the work session to order at 6:00 p.m.
COUNCILMEMBERS PRESENT
Mayor Thomas Muir
Mayor Pro Tem, Place 2 Gary Bilyeu
Councilmember, Place 1 Marissa Barrett
Councilmember, Place 3 Dennis Dillon
Councilmember, Place 4 Allen Chick
Councilmember, Place 5 Victor Gann
COUNCILMEMBERS ABSENT
None
STAFF MEMBERS PRESENT:
City Manager John Noblitt, Assistant City Manager Alina Ciocan, City Secretary Kelly Edwards,
City Attorney Hugh Coleman, Finance Director Clayton Gray, Parks & Recreation Superintendent
Ryan Nolting, Director of Human Resources and Special Projects Jeriana Staton, Marketing and
Civic Engagement Director Donna Green, and Chief of Police Waylan Rhodes.
EXECUTIVE SESSION
Pursuant to the Open Meetings Act, Chapter 551, the City Council Will Meet in a
Closed Executive Session in Accordance with the Texas Government Code:
Section 551.072. DELIBERATION REGARDING REAL PROPERTY
For deliberations regarding the purchase, exchange, lease, or value of real property
if deliberation in an open meeting would have a detrimental effect on the position of
the governmental body in negotiations with a third person specifically, Michael Riley, Laura
Riley, and J. Mike Riley Ranch Properties, LLC, (collectively the "Owner").
Council convened into executive session at 6:01 p.m.
6
Item 2.
City Council Minutes 02-21-2023
Page 2 of 5
RECONVENE INTO WORK SESSION
Council reconvened into work session at 7:09 p.m.
No action taken.
OVERVIEW OF ITEMS ON THE REGULAR AGENDA
No discussion or discussion.
ADJOURN THE WORK SESSION
There being no further business, Mayor Muir adjourned the work session at 7:10 p.m.
CALL THE REGULAR MEETING TO ORDER AND ESTABLISH A QUORUM
Mayor Muir called the regular meeting to order at 7:10 p.m.
COUNCILMEMBERS PRESENT
Mayor Thomas Muir
Mayor Pro Tem, Place 2 Gary Bilyeu
Councilmember, Place 1 Marissa Barrett
Councilmember, Place 3 Dennis Dillon
Councilmember, Place 4 Allen Chick
Councilmember, Place 5 Victor Gann
COUNCILMEMBERS ABSENT
None
STAFF MEMBERS PRESENT:
City Manager John Noblitt, Assistant City Manager Alina Ciocan, City Secretary Kelly Edwards,
City Attorney Hugh Coleman, Finance Director Clayton Gray, Director of Development Services
Ramie Hammonds, Parks & Recreation Superintendent Ryan Nolting, Director of Human
Resources and Special Projects Jeriana Staton, Marketing and Civic Engagement Director Donna
Green, Chief of Police Waylan Rhodes, and Director of Public Works Jim Bolz.
INVOCATION AND PLEDGE
Councilmember Dillon gave the invocation, the Pledge of Allegiance was led by Councilmember
Barrett.
7
Item 2.
City Council Minutes 02-21-2023
Page 3 of 5
CITIZENS COMMENTS
No one addressed the Council.
REPORTS
1. Construction update from DEC Engineering, Dannenbaum, regarding the IH-35 / FM
455 Expansion Project.
Rodney Prince provided an overview and update regarding the construction.
Discussion ensued regarding the completion of the project, the remaining valve and
fire hydrant pours, repair to the street cuts along FM 455, and clearing the Right-of-
way for the TxDOT project along IH-35.
2. Presentation and overview of the City Secretary's Office.
City Secretary Edwards provided a presentation and overview of the City Secretary’s
Office.
Discussion ensued regarding the volume of Public Information Act requests, the
process for an Attorney General’s records opinion, and back storage for Laserfiche.
CONSENT AGENDA
3. Consideration and possible action on the minutes from the February 3, 2023, meeting.
4. Consideration and possible action on the minutes from the February 4, 2023, meeting.
5. Consideration and possible action on the minutes from the February 6, 2023, meeting.
6. Consideration and possible action on accepting a donation in the amount of $5000.00
from Sanger Softball Association to upgrade the new scoreboards at Porter Park.
7. Consideration and possible action on Resolution 2023-01, Appointing Matt Fuller to the
Ray Roberts Planning Commission.
Councilmember Dillon asked for clarification on Item 7 regarding Matt serving on the
Ray Roberts Commission and the City’s P&Z Commission.
Councilmember Bilyeu asked about the donation and recognition of Item 6.
Motion to approve made by Councilmember Barrett, Seconded by Councilmember
Bilyeu.
Voting Yea: Councilmember Chick, Councilmember Dillon, and Councilmember Gann.
Motion passed unanimously.
8
Item 2.
City Council Minutes 02-21-2023
Page 4 of 5
ACTION ITEMS
8. Consideration and possible action on ratifying Change Request No. 1 in the amount of
$5,060.00 with North Rock Construction for the Porter Park Softball Field Renovations.
Director Nolting provided an overview and update on the project, including the
donation in the same amount as the change order.
Motion to approve the ratification made by Councilmember Barrett, Seconded by
Councilmember Gann.
Voting Yea: Councilmember Bilyeu, Councilmember Chick, and Councilmember Dillon.
Motion passed unanimously.
9. Consideration and possible action on ratifying Change Request No. 2 in the amount of
$531.30 with North Rock Construction for the Porter Park Softball Field Renovations.
Motion to approve made by Councilmember Barrett, Seconded by Councilmember
Gann.
Voting Yea: Councilmember Bilyeu, Councilmember Chick, and Councilmember Dillon.
Motion passed unanimously.
10. Consideration and possible action on Change Order No. 9 in the amount of
$334,518.20 with Quality Excavation, LLC for the FM 455 Project to identify all line
item overruns; and authorize the City Manager to execute said Change Order No. 9.
Director Bolz provided an overview of the item.
Discussion ensued regarding overruns, as-built drawings, and confirming that all City
utilities have been moved for the FM 455 and IH-35 project.
Motion to approve made by Councilmember Barrett, Seconded by Councilmember
Dillon.
Voting Yea: Councilmember Bilyeu, Councilmember Chick, and Councilmember Gann.
Motion passed unanimously.
FUTURE AGENDA ITEMS
City Manager Noblitt stated that the Council would need to hold a Special meeting on May 16,
2023, to canvass the General Election.
INFORMATIONAL ITEMS
11. Atmos Rider GCR - Rate Filing Docket No 10170 - January 25, 2023
12. Atmos Industrial Sales tariff sheet Schedule I - January 20, 2023
9
Item 2.
City Council Minutes 02-21-2023
Page 5 of 5
EXECUTIVE SESSION
Pursuant to the Open Meetings Act, Chapter 551, the City Council Will Meet in a
Closed Executive Session in Accordance with the Texas Government Code:
Section 551.072. DELIBERATION REGARDING REAL PROPERTY
For deliberations regarding the purchase, exchange, lease, or value of real property
if deliberation in an open meeting would have a detrimental effect on the position of
the governmental body in negotiations with a third person specifically, Michael Riley, Laura
Riley, and J. Mike Riley Ranch Properties, LLC, (collectively the "Owner").
Council did not convene into executive session.
RECONVENE INTO REGULAR SESSION
ADJOURN
There being no further business, Mayor Muir adjourned the meeting at 8:10 p.m.
_______________________________
Thomas E. Muir, Mayor
______________________________
Kelly Edwards, City Secretary
10
Item 2.
CITY COUNCIL COMMUNICATION
DATE: March 6, 2023
FROM: Ramie Hammonds, Development Services Director
AGENDA ITEM: Consideration and possible action on authorizing staff to issue a Request for
Qualifications (RFQ) for professional services to perform a Housing Study.
SUMMARY:
The current Housing Study was done in-house in 2016.
This study will allow the city to collect information on current housing inventory, future housing
based on approved projects, projected future housing needs based on Future Land Use Map, and
market demands.
FISCAL INFORMATION:
Budgeted: YES Amount: N/A GL Account: N/A
RECOMMENDED MOTION OR ACTION:
Staff recommends APPROVAL.
ATTACHMENTS:
RFQ
Exhibit A
11
Item 3.
CITY OF SANGER, TEXAS
REQUEST FOR QUALIFICATIONS (RFQ)
HOUSING STUDY
PROPOSAL DUE DATE:
12:00 Noon Central Time
Tuesday, April 4, 2023
ISSUED BY:
CITY OF SANGER
DEVELOPMENT SERVICES DEPARTMENT
12
Item 3.
2
CITY OF SANGER, TEXAS
REQUEST FOR QUALIFICATIONS (RFQ)
HOUSING STUDY
SECTION 1. INTRODUCTION:
Purpose
The City of Sanger, Texas is seeking the assistance of a professional consultant to complete a
Housing Study. The study would include current housing inventory with house sizes , housing
demand based on City of Sanger current and future growth opportunities, along with current market
demand.
SECTION 2. COMMUNITY PROFILE:
City Overview
The City of Sanger, Texas, with a population of approximately 9,000 is located in North Texas
within Denton County and located along both sides of I-35 and north and south of FM 455. Sanger
is comprised of nearly twelve (12) square miles and is neighbored by Denton to the south, Valley
View to the north, Lake Ray Roberts and Pilot Point to the east, and an unincorporated area to the
west. Major transportation corridors include I-35 and FM 455.
The city is comprised of a mix of residential, commercial, and industrial la nd uses as well as a
vibrant downtown area.
SECTION 3. PROJECT BACKGROUND:
The City recently adopted a new comprehensive plan called Sanger 2040 Comprehensive Plan.
This plan is meant to be a guideline for future development. The Housing Study needs to reflect
the increase in commercial and industrial development and the housing needs as they relate to that
future development. There are housing developments that have recently been approved that would
need to be accounted for in this study. The City previously performed an in-house housing study
in 2016.
SECTION 4. SCOPE OF SERVICES AND DELIVERABLES:
The selected consultant shall prepare the Housing Study to include the current housing inventory
including house sizes, housing inventory with recently approved developments, and identify future
housing needs, and current market trends and demands.
SECTION 5. INFORMATION PROVIDED BY THE CITY:
The Future Land Use Map, map of City Limits and ETJ, Sanger 2040 Comprehensive Plan, current
Housing Study, and newly approved developments. Maps and the Sanger 2040 Comprehensive
Plan can be found on the City’s website.
SECTION 6. TIMELINE:
It is expected that a contract will be executed between the City and the selected consulting firm
within forty-five (45) days of the due date for proposals. It is anticipated that the project will be
13
Item 3.
3
completed within six (6) months from the signing of the contract.
SECTION 7. SUBMISSION DETAILS:
Statement of Qualifications
The consultant shall submit a Statement of Qualifications. The statement, at minimum, should
address each of the specific topics listed below (additional information may be included). Failure
to include any of the following requested information may be cause for the proposal to be
considered incomplete and thus rejected.
1. Provide a cover letter on firm letterhead and identify the project manager and key staff
involved along with contact information for the project manager.
2. Written presentation of the qualifications of the firm and their understanding of the work
to be performed.
3. List of services that will be provided.
4. Availability, credentials, and related experience of the firm and key staff with similar
studies, preferably with municipal governments.
5. Provide copies of the resumes of the proposed project manager and key staff. Provide
information on specific experiences, including roadway impact study, with successful
outcomes in conducting the process and making presentations to public bodies.
6. Include with their proposals a list of at least three (3) current references for whom
comparable work has been performed in the past three (3) years, specifically citing work
in communities similar to Sanger. This list shall include the municipality’s name, person
to contact, address, telephone number, email address, and a brief, but adequately detailed
description of the work performed.
7. Provide complete or partial examples of work similar in nature to this project.
8. List of anticipated sub-contractors and/or partners, if any, and their availability,
credentials, and related experience.
9. Explain the methodology you propose to successfully perform the services outlined in
the Scope of Work.
10. Include a statement on the anticipated time frame based on the scope of work as listed in
this RFQ. Report on prior experience in delivering services within the prescribed time
frame.
SECTION 8. SUBMISSION INSTRUCTIONS:
STATEMENT OF QUALIFICATIONS MUST BE RECEIVED BY
12:00 NOON (CENTRAL TIME) APRIL 4, 2023
SUBMISSIONS RECEIVED AFTER THE DEADLINE WILL NOT BE CONSIDERED
Four (4) printed copies of the Statement of Qualifications in a sealed envelope should be sent to:
Ramie Hammonds
Development Services Director
City of Sanger
14
Item 3.
4
502 Elm Street
Sanger, TX 76266
Phone: 940-458-2059
Email: rhammonds@sangertexas.org
The proposals will be publicly recognized at the same location (City Hall, 502 Elm St, Sanger TX 76266) at
2:00 PM (Central Time) on April 4, 2023.
One (1) electronic, PDF copy of the Statement should also be included on a USB/Flash drive.
Questions should be directed to Ramie Hammonds, Development Services Director, at the contact
information listed above.
SECTION 9. SELECTION PROCESS AND CRITERIA FOR CONSIDERATION OF
QUALIFICATIONS:
Statements will be reviewed and evaluated by the City staff and on a number of criteria, including,
but not limited to the following:
Overall responsiveness and quality of the proposal in clearly stating an
understanding of the project.
Technical understanding of ordinance writing for a City like Sanger, Texas.
Experience and knowledge in developing similar plans by consultant personnel
who will be directly involved with the project.
The nature and quality of the expertise the consultant possesses in a full range of
required disciplines.
The experience and availability of support staff for the project.
The ability to complete the plan within the given timeframe.
References.
After evaluating the proposals, the City may request additional information from any consultant
identified as most responsive to this RFQ. At its discretion, the City may require any consultant to
make a presentation to provide an opportunity to clarify the submission. The City will schedule any
such presentations. The City will evaluate the written proposals and will select the consultant which
meets the best interest of the City. The City shall be the sole judge of its own best interests, the
proposals, and the resulting negotiated agreement. The City’s decisions will be final. The City
reserves the right to negotiate any and all elements of this proposal, including, but not limited to,
the fee structure and terms of the contract, with the proposing firm selected.
A. DISCLAIMER
This RFQ does not commit the City to enter into a contract, nor does it obligate the City to pay for
any costs incurred in the preparation and submission of Statements or anticipation of a contract. The
City reserves the right at its sole discretion: to make selections, to reject any or all submissions, to
issue subsequent RFQ, to remedy technical errors in the RFQ process, and to enter into a contract
with one or more consultants for the provisions of any, all or some of the services described herein.
15
Item 3.
5
B. AGREEMENT FOR PROFESSIONAL SERVICES
Attached as Exhibit A is the City of Sanger’s standard agreement for professional
services. The agreement also indicates the insurance and indemnification requirements
that the City will require of the selected firm.
C. ADDITIONAL INFORMATION:
1. A person or business that contracts with Sanger or who seeks to contract with the City
must file a “Conflict of Interest Questionnaire” (FORM CIQ) which is available online
at www.ethics.state.tx.us and a copy of which is attached to this guideline. The form
contains mandatory disclosures regarding “employment or business relationships” with
a municipal officer. Officials may be asked to clarify or interpret various portions of the
questionnaire.
2. Compliance with HB 89. A person or business that contracts with Sanger or who seeks
to contract with the City shall not boycott Israel at any time while providing products or
services to the City of Sanger. This requirement does not apply to companies with fewer
than ten full-time employees; or contracts that are less than $100,000.00.
[ ] Yes, we agree [ ] No, we do not agree
[ ] N/A
3. Respondent verifies that it does not boycott energy companies and will not boycott
energy companies during the term of this contract, as those terms are defined by Chapter
2274, Government Code. This requirement does not apply to companies with fewer than
ten full-time employees; or contracts that are less than $100,000.00.
[ ] Yes, we agree [ ] No, we do not agree
[ ] N/A
4. Respondent verifies that it does not have a practice, policy, guidance, or directive that
discriminates against a firearm entity or firearm trade association and will not
discriminate during the term of this contract against a firearm entity or firearm trade
association, as those terms are defined by Chapter 2274, Government Code. This
requirement does not apply to companies with fewer than ten full- time employees; or
contracts that are less than $100,000.00.
[ ] Yes, we agree [ ] No, we do not agree
[ ] N/A
16
Item 3.
6
5. Compliance with SB 252. A person or business that contracts with Sanger or who seeks
to contract with the City shall not do business with Iran, Sudan, or a foreign terrorist
organization while providing products or services to the City of Sanger.
[ ] Yes, we agree [ ] No, we do not agree
The undersigned affirms that he/she has read and understands the specifications, terms,
and conditions, all exhibits and attachments contained herein and that they are duly
authorized to execute this agreement and response to the Request for Qualifications.
Signature Company Date
17
Item 3.
PROFESSIONAL SERVICES AGREEMENT
BY AND BETWEEN THE CITY OF SANGER AND
#RESPONDENT#
THIS AGREEMENT is made and entered by and between the City of Sanger, Texas, hereinafter
referred to as "Sanger", and _______________, a Texas corporation, hereinafter referred to as
“RESPONDENT” to be effective from and after the date as provided herein.
WITNESSETH
WHEREAS, Sanger desires to engage the services of a qualified RESPONDENT to
_____________________; and
WHEREAS, Sanger finds that RESPONDENT is the most qualified party to provide such services;
and
WHEREAS, RESPONDENT desires to render such services for Sanger upon the terms and
conditions provided herein; and
NOW, THEREFORE, for and in consideration of the covenants contained herein, and for the
mutual benefits to be obtained hereby, the parties hereto agree as follows:
I.
ENGAGEMENT
Sanger hereby agrees to retain RESPONDENT to _________________, and RESPONDENT
agrees to perform such services in accordance with the Scope of Services and the terms and conditions of
this Agreement.
II.
SCOPE OF SERVICES
The parties agree that RESPONDENT shall perform such services as are further described in
Exhibit “A” hereto (collectively “Scope of Services”). The parties understand and agree that deviations or
modifications in the Scope of Services may be authorized from time to time by Sanger but said authorization
must be made in writing.
III.
COMPLETE AGREEMENT
This Agreement, including Exhibit "A", constitutes the entire agreement by and between the parties
regarding the subject matter hereof and supersedes all prior or contemporaneous written or oral
understandings. This Agreement may only be amended, supplemented, modified, or canceled by a duly
executed written instrument.
IV.
TERM OF AGREEMENT/TERMINATION
The initial term of this Agreement shall commence upon the complete execution of the Agreement
by Sanger and RESPONDENT and shall continue until the Scope of Services is completed. This agreement
may be terminated by either party with thirty (30) days’ notice unless specified otherwise in Exhibit “A”.
18
Item 3.
In the event of termination by Sanger, RESPONDENT shall be compensated in accordance with the terms
of this Agreement and shall deliver to Sanger all finished or unfinished documents, data, studies, surveys,
drawings, maps, models, reports, photographs, or other items prepared by RESPONDENT in connection
with this Agreement.
V.
COMPENSATION AND EXPENSES
RESPONDENT shall be paid for performance of the Scope of Services as set forth in Exhibit “A”.
VI.
INDEPENDENT CONTRACTOR
RESPONDENT covenants and agrees that it is an independent contractor and not an officer, agent,
servant or employee of Sanger; that it shall have exclusive control of and exclusive right to control the
details of the work performed hereunder and all persons performing same, and shall be responsible for the
acts and omissions of its officers, agents, employees, contractors, subcontractors and RESPONDENTs; that
the doctrine of respondent superior shall not apply as between Sanger and RESPONDENT, its officers,
agents, employees, contractors, subcontractors and RESPONDENTs, and nothing herein shall be construed
as creating a partnership or joint enterprise between Sanger and RESPONDENT.
VII.
ASSIGNMENT
RESPONDENT agrees that this Agreement shall not be assigned without the prior written consent
of Sanger, except to an Affiliate of RESPONDENT. Affiliate shall mean (1) any corporation or other entity
controlling, controlled by, or under common control with (directly or indirectly) RESPONDENT,
including, without limitation, any parent corporation controlling RESPONDENT or any subsidiary that
RESPONDENT controls; (2) the surviving corporation resulting from the merger or consolidation of
RESPONDENT; or (3) any person or entity which acquires all of the assets of RESPONDENT as a going
concern. RESPONDENT shall be permitted to enter into subcontracts for performance of portions of the
Scope of Services; however, RESPONDENT shall not subcontract the entirety of the Scope of Services to
a single subcontractor without Sanger’s consent. RESPONDENT further agrees that the assignment of any
portion or feature of the work or materials required in the performance of this Agreement shall not relieve
the RESPONDENT from its full obligations to Sanger as provided by this Agreement.
VIII.
AUDITS AND RECORDS
RESPONDENT agrees that Sanger or its duly authorized representatives shall, until the expiration
of three (3) years after termination under this Agreement, upon reasonable notice, have access to and the
right to examine and photocopy any and all books, documents, papers and records of RESPONDENT which
are directly pertinent to the services to be performed under this Agreement . RESPONDENT agrees that
Sanger shall have access during normal working hours to all necessary RESPONDENT’s facilities and shall
be provided adequate and appropriate work space.
IX.
WARRANTY
19
Item 3.
RESPONDENT warrants that (a) it and each of its employees, RESPONDENTs and
subcontractors, if any, that it uses to provide and perform professional services has the necessary
knowledge, skills, experience, qualifications, and resources to provide and perform the services in
accordance with the agreement and the Scope of Services; and (b) the professional services will be
performed for and delivered to Sanger in a good, diligent, workmanlike manner in accordance with industry
standards.
X
INDEMNITY
RESPONDENT, to the extent allowable by law, shall defend, indemnify, and hold harmless Sanger,
its City council, officers, employees, and agents from and against all citations, claims, costs, damages,
demands, expenses, fines, judgments, losses, penalties, or suits, which in any way arise out of, relate to, or
result from the performance of the work or which are caused by the intentional acts or negligent acts or
omissions of its subcontractors, any officers, agents, or employees. Sanger, to the extent allowable by law,
shall defend, indemnify, and hold harmless the RESPONDENT, its officers, employees, and agents from
and against all citations, claims, costs, damages, demands, expenses, fines, judgments, losses, penalties, or
suits, which in any way arise out of, relate to, or result from the performance of the work or which are
caused by the intentional acts or negligent acts or omissions of its subcontractors, any officers, agents, or
employees.
XI.
MAILING OF NOTICES
RESPONDENT agrees that all notices or communications to Sanger permitted or required under
this Agreement shall be addressed to Sanger at the following address:
City Manager
City of Sanger
502 Elm Street
P.O. Box 1729
Sanger, Tx 76266
Sanger agrees that all notices or communications to RESPONDENT permitted or required under
this Agreement shall be addressed to RESPONDENT at the following address:
[Insert Address]
All notices or communications required to be given in writing by one party or the other shall be
considered as having been given to the addressee on the date such notice or communication is posted by
the sending party.
XII.
MISCELLANEOUS
1. The City of Sanger has found that RESPONDENT is the most qualified party to fulfill the
requirements of the agreement as this is a contract for the purchase of personal and/or professional services
and therefore is exempt from competitive bidding.
20
Item 3.
2. A person or business that contracts with the Sanger or who seeks to contract with Sanger must file
a “Conflict of Interest Questionnaire” (FORM CIQ) which is available online at www.ethics.state.tx.us and
a copy of which is attached to this guideline. The form contains mandatory disclosures regarding
“employment or business relationships” with a municipal officer. Officials may be asked to clarify or
interpret various portions of the questionnaire.
3. Compliance with SB 252: RESPONDENT agrees per SB 252 that RESPONDENT shall not do
business with Iran, Sudan or a foreign terrorist organization while providing products or services to the City
of Sanger.
4. Compliance with HB 89: RESPONDENT agrees per HB 89 that RESPONDENT shall not boycott
Israel at any time while providing products or services to the City of Sanger. This requirement does not
apply to companies with fewer than ten full-time employees; or contracts that are less than $100,000.00.
5. Respondent verifies that it does not boycott energy companies and will not boycott energy companies
during the term of this contract, as those terms are defined by Chapter 2274, Government Code. This
requirement does not apply to companies with fewer than ten full-time employees; or contracts that are less
than $100,000.00.
6. Respondent verifies that it does not have a practice, policy, guidance, or directive that discriminates
against a firearm entity or firearm trade association and will not discriminate during the term of this contract
against a firearm entity or firearm trade association, as those terms are defined by Chapter 2274,
Government Code. This requirement does not apply to companies with fewer than ten full-time employees;
or contracts that are less than $100,000.00.
XIII.
VENUE/GOVERNING LAW
The parties agree that the laws of the State of Texas shall govern this Agreement, and that it is
performable in City of Sanger, Texas. Exclusive venue shall lie in Denton County, Texas.
XIV.
SUCCESSORS AND ASSIGNS
RESPONDENT and their partners, successors, subcontractors, executors, legal representatives, and
administrators are hereby bound to the terms and conditions of this Agreement.
XV.
INSURANCE
RESPONDENT shall procure and maintain in force during the terms of any contract awarded
pursuant to this RFP, at its own cost, the following minimum insurance coverage:
A. Workers’ Compensation and Employers’ Liability:
21
Item 3.
i. State of Texas: $1,000,000 Each Accident
ii. Employer’s Liability: $100,000 Each Accident
B. Commercial General Liability:
i. Bodily Injury & Property Damage with a
General Aggregate Limit: $1,000,000
ii. Personal & Advertising Injury Limit $500,000
iii. Each Occurrence Limit $1,000,000
The policy shall be on an Occurrence Form and include the following coverage: Premises
Operations; Personal and Advertising Injury; Medical Payments; Liability assumed under an Insured
Contract; Independent Contractors; and Broad Form Property Damage. Coverage provided should be at
least as broad as found in Insurance Services Office (ISO) form CG0001.
C. Commercial Automobile Liability Limits:
i. Bodily Injury & Property Damage
Combined Single Limit: $1,000,000
Prior to the execution of any awarded contract by the City, the successful RESPONDENT shall forward
Certificates of Insurance to the Purchasing Manager. The required insurance policies shall be procured and
maintained in full force and effect for the duration of the awarded contract. Certificate Holder shall be the
City of Sanger, Texas at 502 Elm Street, Sanger, Texas 76266.
XIV.
SEVERABILITY
In the event a term, condition, or provision of this Agreement is determined to be void,
unenforceable, or unlawful by a court of competent jurisdiction, then that term, condition, or provision,
shall be deleted and the remainder of the Agreement shall remain in full force and effect.
XV.
AUTHORITY TO SIGN
The undersigned officers and/or agents of the parties hereto are the properly authorized officials
and have the necessary authority to execute this Agreement on behalf of the parties hereto.
This Agreement shall be effective from and after the date of execution by the last signatory hereto
as evidenced below.
SIGNED on the date indicated below.
22
Item 3.
Date: _______________ RESPONDENT
BY:
_________________________________
Manager/Partner
Date: _______________ CITY OF SANGER
BY:
_________________________________
Mayor/City Manager
APPROVED AS TO FORM:
________________________
Hugh Coleman
City Attorney
23
Item 3.
Exhibit “A”
Bid Response/Scope of Services
24
Item 3.
CITY COUNCIL COMMUNICATION
DATE: March 6, 2023
FROM: Ramie Hammonds, Development Services Director
AGENDA ITEM: Conduct a public hearing on a request for the Replat of Lot 2, of the IESI
Industrial Park, being 2.993 acres located within the City of Sanger. Generally
located along the north side of Utility Road approximately 1464 feet east of the
intersection of North Stemmons Frwy and Utility Road.
SUMMARY:
The applicant is proposing to create 1 industrial lot of 2.993 acres, from 1 previously platted tract.
The site is zoned Industrial 1
The applicant is proposing to create warehouses on the site.
Lot 2-R has approximately 461 feet of frontage on Utility Road.
There was no right-of-way dedication required.
The replat will establish all easements required to make the site a developable site.
Staff mailed out 9 notices and at the time of this report has not received any responses.
The property is located in the City of Sanger.
The Planning and Zoning Commission recommend APPROVAL on 2-13-23 with the condition all
comments were satisfied prior to City Council.
FISCAL INFORMATION:
Budgeted: N/A Amount: N/A GL Account: N/A
N/A
ATTACHMENTS:
Location Map
25
Item 4.
UTILITY RD
900UTILITY RD 902UTILITY RD
/Project Name: IESI Industr ial ParkReplatProject: 23SANZO N-0002
0 250 500125 Fe et
DISCLA IMER:This map wa s g en e ra te d by GI S da ta p ro vid edby the S a ng er GIS De pa rtme nt . Th e City o f Sanger do es n ot gu a ra n te e the c orrec tne ss oraccuracy o f a n y fe a tu re s o n th is ma p. Th ese ma pproducts are fo r illust ra tio n pu rpo se s o n ly an dare not suit ab le fo r site -s pe cific d e cision ma king .GIS dat a is su bje ct to co nst an t cha n ge s, an dmay not b e co mple te , a ccu rat e o r cu rren t.Date: 1/22 /2 02 3 4 :0 5:4 8 P MDoc Name : 2 3 SA NZON-0 00 2 _IE S I I nd us tria l P ark Rep latCity L imi ts Exhi bi ts
SubjectArea
26
Item 4.
CITY COUNCIL COMMUNICATION
DATE: March 6, 2023
FROM: Ramie Hammonds, Development Service Director
AGENDA ITEM: Conduct a public hearing regarding amending Chapter 13 Utilities, by adding
Article 13.2800 Municipal Setting Designation, Sections 13.2801 Definitions,
13.2802 Use of Groundwater in MSD Areas Prohibited, 13.2803 Application for
City Council Approval of MSD, 13.2804 Staff Review, 13.2805 Notice of Public
Meeting, 13.2806 Public Meeting, 13.2807 City Council Public Hearing, 13.2808
Limitation on Reapplication, and 13.2809 Additional Provisions, Enforcement,
and Penalties
SUMMARY:
The City of Sanger’s Code of Ordinance currently does not address Municipal Setting Designations
(MSD’s).
This ordinance will establish a process and guidelines for requesting a MSD.
MSD’s are requested when a property has contamination that would typically require remediation.
Often the remediation is costly and makes developing the property difficult.
In certain cases these properties can apply for a MSD to allow the property to develop or be used
without remediation.
This ordinance gives City Council the ability to approve, conditionally approve, disapprove, or
postpone action on the application.
FISCAL INFORMATION:
Budgeted: N/A Amount: N/A GL Account: N/A
RECOMMENDED MOTION OR ACTION:
Staff recommends APPROVAL.
ATTACHMENTS:
Ordinance No 03-04-23
27
Item 5.
Ordinance – 03-04-23 Amendment to Chapter 13 Municipal Settings Designation
Page 1 of 2
CITY OF SANGER, TEXAS
ORDINANCE 03-04-23
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SANGER, DENTON
COUNTY, TEXAS, REGARDING AMENDING THE CITY OF SANGER CODE OF
ORDINANCE, CHAPTER 13 UTILITIES, ARTICLE 13.2800 MUNICIPAL SETTING
DESIGNATION, SECTIONS 13.2801 DEFINITIONS, 13.2802 USE OF GROUNDWATER
IN MSD AREAS PROHIBITED, 13.2803 APPLICATION FOR CITY COUNCIL
APPROVAL OF MSD, 13.2804 STAFF REVIEW, 13.2805 NOTICE OF PUBLIC
MEETING, 13.2806 PUBLIC MEETING, 13.2807 CITY COUNCIL PUBLIC HEARING,
13.2808 LIMITATION ON REAPPLICATION, AND 13.2809 ADDITIONAL
PROVISIONS, ENFORCEMENT, AND PENALTIES; PROVIDING FOR THE REPEAL
OF ALL ORDINANCES IN CONFLICT; PROVIDING A CUMULATIVE CLAUSE;
PROVIDING FOR A SEVERABILITY CLAUSE; PROVIDING FOR A PENALTY OF
FINE IN ACCORDANCE WITH SECTION 1.109 OF THE CODE OF ORDINANCE FOR
VIOLATIONS; AND PROVIDING A SAVINGS CLAUSE; AUTHORIZING PUBLICATION;
AND ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, the City of Sanger (the “City”) is a home rule municipality regulated by state
law and Charter; and
WHEREAS, the City Council finds it necessary for the public health, safety, and welfare
that development occur in a controlled and orderly manner; and
WHEREAS, all request for amendment to the Code of Ordinance were duly filed with the
City of Sanger, Texas; and
WHEREAS, the following provision of proper legal notice requirements, were made in
the time and manner prescribed by law; and
WHEREAS, the City Council finds that the passage of this Ordinance is in the best interest
of the citizens of Sanger.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
SANGER, TEXAS:
SECTION 1. That an amendment to Chapter 13 Utilities, Article 13.2800 Municipal
Setting Designation, Sections 13.2801 Definitions, 13.2802 Use of Groundwater in MSD Areas
Prohibited, 13.2803 Application for City Council Approval of MSD, 13.2804 Staff Review,
13.2805 Notice of Public Meeting, 13.2806 Public Meeting, 13.2807 City Council Public Hearing,
13.2808 Limitation on Reapplication, and 13.2809 Additional Provisions, Enforcement, and
Penalties as described in Exhibit A is hereby granted.
28
Item 5.
Ordinance – 03-04-23 Amendment to Chapter 13 Municipal Settings Designation
Page 2 of 2
SECTION 2. That all matters stated in the preamble are found to be true and correct and
are incorporated herein as if copied in their entirety.
SECTION 3. It is hereby declared to be the intention of the City Council that the sections,
paragraphs, sentences, clauses, phrases and words of this Ordinance are severable and, if any
word, phrase, clause, sentence, paragraph, or section of this Ordinance shall be declared
unconstitutional by the valid judgment or decree of any court of competent jurisdiction, such
unconstitutionality shall not affect any of the remaining portions of this Ordinance, since the same
would have been enacted by the City Council without the incorporation in this Ordinance of any
such unconstitutional word, phrase, clause, sentence, paragraph, or section.
SECTION 4. Any person, firm or corporation who shall violate any of the provisions of
this article shall be guilty of a misdemeanor and upon conviction shall be fined in accordance
with the general penalty provision found in The Code of Ordinances, Section 1.109 General
Penalty for Violations of Code.
SECTION 5. This ordinance will take effect immediately from and after its passage and
the publication of the caption, as the law and Charter in such cases provide.
PASSED AND APPROVED by the City Council of the City of Sanger, Texas, on this
6th day of March, 2023.
APPROVED:
________________________________
ATTEST: Thomas E. Muir, Mayor
________________________________ APPROVED TO FORM:
Kelly Edwards, City Secretary
________________________________
Hugh Coleman, City Attorney
29
Item 5.
EXHIBIT A
ARTICLE 13.2800 MUNICIPAL SETTING DESIGNATION (MSD)
Sec. 13.2801 Definitions
For the purposes of this article, the following terms, phrases, words, abbreviations, and their
derivations shall have the meaning given herein. When not inconsistent with the context, words
used in the present tense include the future tense, words in the plural number include the singular
number and words in the singular number include the plural number. The word "shall" is always
mandatory and not merely directory. Words not defined shall be given their common and ordinary
meaning.
Affected community. Those persons entitled to notice as defined in section 13-2803(b)(6).
Authorized representative. For purposes of signing an application, if the applicant is a corporation,
the president, secretary, treasurer, or vice-president of the corporation in charge of a principal
business function, or any other person who performs similar policy or decision-making functions
for the corporation; if the applicant is a partnership or sole proprietorship, a general partner or
proprietor, respectively; and if the applicant is a local government, the chief executive officer or
his authorized designee.
Chemical or contaminant of concern. Any chemical that has the potential to adversely affect
ecological or human receptors due to its concentration, distribution, and mode of toxicity.
City attorney. The City Attorney for the City of Sanger or the City Attorney's authorized
representative.
Designated groundwater. Groundwater that will be or is prohibited from use as potable water, or
for all uses, by a municipal setting designation ordinance.
Designated property. The property that will be or is subject to a municipal setting designation
ordinance. The designated property may cover several platted lots or tracts of land.
Director. The Director of Development Services for the City of Sanger, or the Director's authorized
representative.
Environmental risk assessment. The qualitative and quantitative evaluations performed to define
the risk posed to human health and/or the environment by the presence or potential presence and/or
use of pollutants.
Groundwater. Water below the surface of the earth.
Ingestion protective concentration level. The protective concentration level for human ingestions
of contaminants of concern established by the TCEQ under the Texas Risk Reduction Program,
determined as if there was no municipal setting designation.
Ingestion protective concentration level zone. The area where concentrations of contaminants of
concern from sources on or migrating through the designated property are greater than the
30
Item 5.
ingestion protection concentration level, determined as if there was no municipal setting
designation.
Municipal setting designation (MSD). A designation as provided by V.T.C.A. Health and Safety
Code Ch. 361, Subch. W, which authorizes the Executive Director of the Texas Commission on
Environmental Quality to certify municipal setting designations to limit the scope of, or eliminate
the need for, investigations or response actions addressing contaminant impacts to groundwater
that has been restricted from use by ordinance or restrictive covenant.
Municipal setting designation ordinance. An ordinance adopted pursuant to this article.
Noningestion protective concentration level. The protective concentration level for dermal contact
or inhalation of contaminants of concern established by the TCEQ under the Texas Risk Reduction
Program.
Noningestion protective concentration level exceedance zone. The area where concentrations of
contaminants of concern from sources on or migrating from or through the designated property are
greater than noningestion protection concentration levels for contaminants of concern established
by the TCEQ under the Texas Risk Reduction Program.
Potable water. Water used for irrigating crops intended for human consumption, as well as water
used for drinking, showering, bathing, or cooking purposes.
Protective concentration level. The lowest concentration level for a contaminant of concern within
a source medium is determined from all applicable exposure pathways and as defined in the Texas
Risk Reduction Program.
Response action. The control, decontamination, or removal from the environment of a contaminant
or hazardous substance pursuant to V.T.C.A. Health and Safety Code Ch. 361, Subch. W,
"Municipal Setting Designation," of "Solid Waste Disposal Act".
TCEQ. The Texas Commission on Environmental Quality.
TCEQ application. The application submitted to the TCEQ for certification of a municipal setting
designation.
To the extent known. Information known by an applicant or applicant's agent after review of all
public and private records and other information sources available in the exercise of due diligence.
Sec. 13.2802 Use of Groundwater in MSD Areas Prohibited
(a) A person commits an offense if the person intentionally, knowingly, or with criminal
negligence uses groundwater in the designated property as a potable or non-potable water
source.
(b) A person commits an offense if the person intentionally, knowingly, or with criminal
negligence uses groundwater in designated property for any purpose prohibited as a condition
of council approval, as specified in section 13.2807(d).
31
Item 5.
Sec. 13.2803 Application for City Council Approval of MSD
(a) A person seeking city council approval of an MSD for an area within the corporate limits of
the City of Sanger shall apply in writing to the Development Services Department of the City
of Sanger, with the number and format of copies, as determined by the director.
(b) An application shall contain:
(1) The applicant's name and address, and the name, address, daytime telephone number,
and email address of both the applicant's contact person and the licensed professional
who prepared the application;
(2) The location and legal description of the proposed outer boundaries of the MSD area for
which designation is sought;
(3) A statement as to whether a public drinking water supply system exists that satisfies the
requirements of V.T.C.A. Health and Safety Code Ch. 341 and that supplies or is capable
of supplying drinking water to the area for which the MSD is sought, and property within
one-half mile of the area for which the MSD is sought;
(4) A description of the groundwater sought to be restricted, including the identified
chemicals of concern therein and the levels of contamination known to the applicant,
and the identified vertical and horizontal extent of the contamination. If the applicant has
not documented groundwater contamination offsite that originates from the area for
which an MSD is sought, the application shall include a statement as to whether
contamination more likely than not exceeds residential assessment levels offsite and the
basis for that statement;
(5) Identification of the points of origin of the contamination, and identification of the
person(s) responsible for the contamination, to the extent known;
(6) A listing of:
a. All state-registered private water wells within five (5) miles from the boundary of
the area for which the designation is sought, including a notation of those wells that
are used for potable water purposes (if known);
b. Each retail public utility, as that term is defined in the Texas Water Code, that owns
or operates a groundwater supply well located not more than five (5) miles from the
area for which the MSD is sought;
c. Each municipality, other than the City of Sanger, with a boundary located not more
than one-half (½) mile from the area for which the MSD is sought; or that owns or
operates a groundwater supply well located not more than five (5) miles from the
area for which the MSD is sought; and
d. All owners of real property lying within two hundred (200) feet of the subject
property, as the ownership appears on the last approved city tax roll.
(7) A site map, drawn to scale, including a metes and bounds description of the proposed
designated property, the boundary of the proposed MSD area, the location of
groundwater on the proposed MSD area, and the extent of groundwater contamination
to the limits that it has been defined. The map shall include a statement by a professional
32
Item 5.
land surveyor registered by the Texas Board of Professional Surveying attesting to the
accuracy of the metes and bounds description;
(8) The location of all soil sampling points and groundwater monitoring wells;
(9) For each contaminant of concern found at the site, to the extent known, provide a table
displaying the following information:
a. The level of contamination, the ingestion protective concentration level, and
noningestion protective concentration levels, all expressed as mg/L or mg/kg,
depending on the sampling medium; and
b. The critical protective concentration level as defined without the municipal setting
designation, highlighting any exceedances; and
c. The critical protective concentration level as defined with the municipal setting
designation, highlighting any exceedances; and
d. A digital file, in a format acceptable to the Director, that summarizes this
information.
(10) A statement as to whether contamination on and off the designated property will exceed
a residential assessment level as defined in the Texas Risk Reduction Program if known,
and the basis for that statement;
(11) A description of any environmental regulatory actions that have been taken within the
last five (5) years in conjunction with the designated property, to the extent known;
(12) A listing of all existing TCEQ, U.S. Environmental Protection Agency registrations,
permits, and identification numbers that apply to the designated property;
(13) A summary of any environmental site assessment reports filed with the TCEQ regarding
any site investigation or response actions that are planned, ongoing, or completed related
to this designated property;
(14) A statement as to whether the designated property has been submitted to the Texas
Voluntary Cleanup Program (V.T.C.A. Health and Safety Code § 361.601) or similar
state or federal program, and a description of the designated property's status in the
program;
(15) Any other information that the director deems pertinent.
(c) The application shall be signed by an authorized representative of the applicant and shall
contain the following certification statement:
"I certify under penalty of law that this document and all attachments were prepared under
my direction or supervision in a manner designed to assure that qualified personnel properly
gather and evaluate the information submitted. Based on my inquiry of the person or persons
directly responsible for gathering the information, the information submitted is, to the best of
my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment
for knowing violations."
(d) An application shall be accompanied by:
33
Item 5.
(1) An electronic file of the names and addresses of persons listed in subsection (b)(6) above,
in a format acceptable to the director and compatible with city information systems; and
(2) A set of printed mailing labels with the names and addresses of persons listed in
subsection (b)(6) above; and
(3) A nonrefundable application fee in an amount set by the city council; and
(4) It is the sole responsibility of the applicant to ensure that the language of the public
notice, as well as the notification process itself, meets the state requirements.
(e) An applicant may withdraw their application only in writing by letter sent by certified mail,
return receipt requested, to the Director, and shall forfeit the application fee. If the Director
has not issued public notice prior to the receipt of the withdrawal letter, the applicant may
reapply at any time. If public notice has been issued, a new application is subject to the
limitations of section 13-2808 below.
Sec. 13.2804 Staff Review
(a) For purposes of the times stated in this article, an application is deemed to have been received
on the date that the application was actually received by the Director, as indicated by the filing
date on the application by the Development Services department.
(b) The application for an MSD shall be forwarded to the development review committee (DRC)
for staff review. The purpose of the review is to determine whether the application is complete
and whether any current or future city property or other interests have the potential to be
impacted by the proposed MSD. City staff shall not conduct an environmental risk assessment
of the application.
(c) If the Director, in his or her sole discretion, determines that it is likely that a source of a
contaminant of concern originated on the designated property, and that the ingestion or
noningestion protective concentration level exceedance zone for that contaminant of concern
extends to the public right-of-way adjacent to the designated property, the Director may
recommend that the municipal setting designation include a condition that the public right-
of-way adjacent to the property be included, at no additional cost to the city, in the TCEQ
application for the MSD.
(d) If the Director determines that the application is incomplete or insufficient, the application
will be returned to the applicant, noting the deficiencies in writing. The applicant shall have
thirty (30) days from the date of the deficiency letter to correct the deficiencies and resubmit
the application. If the applicant fails to submit a corrected application within the allotted time,
the application shall be deemed to be withdrawn and the application fee forfeited.
(e) If the Director determines that the application is complete, a public meeting and a public
hearing will be scheduled. The public meeting must be held prior to the public hearing.
(1) A public meeting will be scheduled approximately forty-five (45) days following the day
the application was received; and
(2) A public hearing of the city council will be scheduled approximately thirty (30) days
following the public meeting.
34
Item 5.
Sec. 13.2805 Notice of Public Meeting
(a) Notice of the public meeting for an MSD application must include the date, time, and location
of the public meeting, the identity of the applicant, the location and legal description of the
designated property, the purpose of the MSD, the type of contamination identified in the
groundwater of the area for which the MSD is sought, and a statement that a copy of the
application is available for public viewing at the city secretary's office notice will be made as
follows:
(1) The Director will publish notice of a public meeting for a proposed MSD in the official
newspaper of the city, or in a newspaper of general circulation, not less than fifteen (15)
days before the public meeting;
(2) The Director will provide written notice of a public meeting for a proposed MSD, not
less than fifteen (15) days before the date of the public meeting by properly addressed
and regular postage paid, in the United States mail. Notice will be mailed to:
a. The applicant;
b. Those on the list provided by the applicant pursuant to section 13-2803(b)(6);
(b) The applicant is required to post at least one (1) sign-up on the area for which an MSD has
been requested. The sign(s) must state that an MSD has been requested for the area and that
additional information can be acquired by telephoning the number listed thereon or visiting
the website address listed thereon. The erection and/or the continued maintenance of any such
sign shall not be deemed a condition precedent to the holding of any public meeting or public
hearing or any official action concerning the MSD application.
Sec. 13.2806 Public Meeting
(a) The purpose of a public meeting is for the applicant to present information to the affected
community about the MSD process in general, the application specific to the property for
which the MSD is being sought, and to obtain input from the affected community prior to
formal action by the city council.
(b) The applicant or its representative must appear at the public meeting. If the applicant fails to
appear at the public meeting either in person or by a representative, the application shall be
deemed withdrawn and the application fee forfeited.
(c) The Director will facilitate the meeting, allowing the applicant or its representative the
opportunity to present its reasons for requesting an MSD, and allowing members of the
affected community the opportunity to ask the applicant questions or make oral comments on
the application.
Sec. 13.2807 City Council Public Hearing
(a) Prior to the public hearing, the Director will provide the city council a copy of the application,
and a written report summarizing the request for the MSD approval, any staff comments or
concerns, and minutes of the public meeting.
35
Item 5.
(b) The applicant or its representative must appear at the public hearing and present the request
for MSD approval. If the applicant fails to appear at the public hearing, the application shall
be deemed withdrawn and the application fee forfeited.
(c) Persons wishing to speak either in favor of or against the application will be provided the
opportunity by city council guidelines for public hearings.
(d) Following the conclusion of the public hearing, the city council may approve, conditionally
approve, disapprove, or postpone action on the application to a future date. If approving an
application, the city council shall:
(1) Approve a municipal setting designation ordinance supporting the application to be
presented to the TCEQ, and prohibiting the use of designated groundwater from beneath
the designated property; and
(2) Include in the ordinance other reasonable restrictions, including, but not limited to
specification of underground construction materials to be used in the designated
property.
(e) City council approval of an application shall not be deemed to waive the city's right to
comment on an MSD application that has been filed with the executive director of the TCEQ.
Sec. 13.2808 Limitation on Reapplication
If after a public hearing the city council disapproves an application, or if the applicant has
withdrawn its application after public notice has been issued, no new MSD applications for the
proposed designated property shall be accepted by the city or scheduled for a public hearing by
the city council within a period of twelve (12) months of the date of disapproval or withdrawal.
Sec. 13.2809 Additional Provisions, Enforcement, and Penalties
(a) A person who has received approval of an MSD from the city, shall, upon issuance from the
TCEQ, provide the Director with a copy of the certificate of completion or other
documentation issued for the MSD area, showing that response actions, if required, have been
completed.
(b) The applicant shall execute, deliver and file, no later than thirty (30) days from the date of the
TCEQ's certification, in the official real property records of Denton County, Texas, a deed
restriction approved as to form by the City Attorney prohibiting the drilling of wells and the
use of designated groundwater for any purpose, including but not limited to any potable
purpose, and excepting only: (i) wells used as monitoring wells for the collection of
groundwater samples for chemical or biological laboratory analyses; and (ii) wells used for
remediation of soil or groundwater contamination.
(c) A file-stamped and recorded copy of said deed restriction shall be delivered to the city
attorney's office and the Director's office within three (3) business days after the date of filing.
The deed restriction shall be enforceable by the City of Sanger and may be amended or
terminated only with the prior written consent of the City of Sanger after at least thirty (30)
days prior written notice to the TCEQ of any pending amendment or termination.
36
Item 5.
(d) A person commits an offense if they fail to provide the City Attorney and the Director with
the documentation required in this section within the specified time frames.
(e) A person commits an offense if the person intentionally, knowingly, or with criminal
negligence uses groundwater in a designated property for a purpose prohibited in the
municipal setting designation ordinance.
(f) Any person who violates any provision of this article shall, upon conviction, be punished by
a fine not to exceed two thousand dollars ($2,000.00). Each day that one or more provisions
in this article are violated shall be considered a separate offense.
(g) The City Attorney is authorized to commence an action for appropriate legal or equitable
relief in a court of competent jurisdiction in addition to the penalty mentioned in the above
subsection (f). Such additional relief may include a civil fine of up to one thousand dollars
($1,000.00) per day for violations of sections 13-2808, and all other damages, costs, remedies,
and legal processes to which the city may be entitled.
(h) This article shall be and is hereby declared to be cumulative of all other ordinances of the
City of Sanger, and this article shall not operate to repeal or affect any of such other
ordinances except insofar as the provisions thereof might be inconsistent or in conflict with
the provisions of this article, in which event such conflicting provisions, if any, in such other
ordinance or ordinances are hereby repealed.
(i) All of the regulations provided in this article are hereby declared to be governmental and for
the health, safety, and welfare of the general public. Any member of the city council or any
city official or employee charged with the enforcement of this article, acting for the City of
Sanger in the discharge of his/her duties, shall not thereby render himself/herself personally
liable; and he/she is hereby relieved from all personal liability for any damage that might
accrue to persons or property as a result of any act required or permitted in the discharge of
his/her said duties.
37
Item 5.
CITY COUNCIL COMMUNICATION
DATE: March 6, 2023
FROM: Ramie Hammonds, Development Services Director
AGENDA ITEM: Consideration and possible action on a request for the Replat of Lot 2, of the
IESI Industrial Park, being 2.993 acres located within the City of Sanger.
Generally located along the north side of Utility Road approximately 1464 feet
east of the intersection of North Stemmons Frwy and Utility Road.
SUMMARY:
The applicant is proposing to create 1 industrial lot of 2.993 acres, from 1 previously platted tract.
The site is zoned Industrial 1
The applicant is proposing to create warehouses on the site.
Lot 2-R has approximately 461 feet of frontage on Utility Road.
There was no right-of-way dedication required.
The replat will establish all easements required to make the site a developable site.
Staff mailed out 9 notices and at the time of this report has not received any responses.
The property is located in the City of Sanger.
The Planning and Zoning Commission recommend APPROVAL on 2-13-23 with the condition all
comments were satisfied prior to City Council.
FISCAL INFORMATION:
Budgeted: N/A Amount: N/A GL Account: N/A
RECOMMENDED MOTION OR ACTION:
Staff recommends DENIAL based on the condition attached comments have not been satisfied.
ATTACHMENTS:
Location Map
Final Plat
Application
Letter of Intent
Engineering Comments
Planning Comments
38
Item 6.
UTILITY RD
900UTILITY RD 902UTILITY RD
/Project Name: IESI Industr ial ParkReplatProject: 23SANZO N-0002
0 250 500125 Fe et
DISCLA IMER:This map wa s g en e ra te d by GI S da ta p ro vid edby the S a ng er GIS De pa rtme nt . Th e City o f Sanger do es n ot gu a ra n te e the c orrec tne ss oraccuracy o f a n y fe a tu re s o n th is ma p. Th ese ma pproducts are fo r illust ra tio n pu rpo se s o n ly an dare not suit ab le fo r site -s pe cific d e cision ma king .GIS dat a is su bje ct to co nst an t cha n ge s, an dmay not b e co mple te , a ccu rat e o r cu rren t.Date: 1/22 /2 02 3 4 :0 5:4 8 P MDoc Name : 2 3 SA NZON-0 00 2 _IE S I I nd us tria l P ark Rep latCity L imi ts Exhi bi ts
SubjectArea
39
Item 6.
LOT 2-R
IESI INDUSTRIAL PARK
2.993 ACRES
130,382 SQUARE FEET
LOT 1
IESI INDUSTRIAL PARK
CABINET U, SLIDE 75,
P.R.D.C.T.
LOT 1, BLOCK A
AUSTIN ADDITION
CABINET W, SLIDE 353
P.R.D.C.T.
TRACT 5
REDI-MIX, INC
VOL. 93, PAGE 48556
D.R.D.C.T.
UTILITY ROAD
(60' ROW PER VOL. 1135, PG. 939, D.R.D.C.T.)
(REMAINDER)
EAGLE FARMS INC.
VOL. 971, PAGE 2
D.R.D.C.T.
N88°42'08"W 461.51'
N
0
1
°
1
7
'
5
2
"
E
2
9
0
.
2
0
'
S88°38'21"E 437.83'
S
0
3
°
2
2
'
2
7
"
E
2
9
0
.
6
8
'
N88°42'08"W
40.14'
B
U
R
L
I
N
G
T
O
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
R
A
I
L
R
O
A
D
(
1
0
0
'
R
O
W
A
S
S
H
O
W
N
O
N
C
A
B
I
N
E
T
U
,
S
L
I
D
E
7
5
,
P
.
R
.
D
.
C
.
T
.
)
ED AUSTIN FAMILY TRUST AND THE AUSTIN TRUST
VOL. 2019, PG. 82956
D.R.D.C.T.
D
D
D
D
FINAL PLAT
LOT 2-R, IESI INDUSTRIAL PARK
BEING A REPLAT OF LOT 2, IESI INDUSTRIAL PARK
AN ADDITION IN THE CITY OF SANGER ACCORDING
TO THE PLAT RECORDED UNDER
CABINET U, SLIDE 75, P.R.D.C.T.
1 LOT | 2.993 ACRES OUT OF THE R. BEBEE SURVEY,
ABSTRACT #29
CITY OF SANGER, DENTON COUNTY, TEXAS
PREPARED DECEMBER, 2022
VICINITY MAP - NOT TO SCALE
SITE
PRELIMINARY
THIS DOCUMENT SHALL NOT BE RECORDED FOR ANY PURPOSE
AND SHALL NOT BE USED, VIEWED, OR RELIED UPON AS A FINAL
SURVEY DOCUMENT December 15, 2022
POINT OF
BEGINNING
LEGEND OF ABBREVIATIONS
·D.R.D.C.T. DEED RECORDS, DENTON COUNTY, TEXAS
·P.R.D.C.T.PLAT RECORDS, DENTON COUNTY, TEXAS
·O.P.R.D.C.T.OFFICIAL PUBLIC RECORDS, DENTON COUNTY, TEXAS
·DOC.#DOCUMENT NUMBER
·C.M.CONTROLLING MONUMENT
·SQ. FT.SQUARE FEET
·ROW RIGHT OF WAY
·CRS CAPPED REBAR SET
SHEET:
Z:\Project Data\Survey\001 - Kirkman Engineering\2020\167 - Sanger Property\Drawings
SURVEYOR'S NOTES:
1.Bearings are based on the State Plane Coordinate System, Texas North
Central Zone (4202) North American Datum of 1983 (NAD '83),
distances are surface with a combined scale factor of 1.00015063.
2.This property lies within Zone "X" of the Flood Insurance Rate Map for
Denton County, Texas and Incorporated Areas, map no. 48121C0070G,
with an effective date of April 18, 2011, via scaled map location and
graphic plotting.
3.Monuments are found unless specifically designated as set.
4.Elevations (if shown) are North American Vertical Datum of 1988
(NAVD '88).
SURVEYOR
BARTON CHAPA SURVEYING
5200 State Highway 121
Colleyville, TX 76034
Phone: 817-864-1957
info@bcsdfw.com
TBPLS Firm #10194474
5200 State Highway 121
Colleyville, TX 76034
Phone: 817-488-4960
DRAWN:BCS
CHECKED:JHB
TABLE OF REVISIONS
DATE SUMMARY
JOB NO.2020.001.167
SCALE: 1" = 30'
30'0 15'30'60'
STATE OF TEXAS §
COUNTY OF DENTON §
WHEREAS PENTHOUSE SPEEDWAY CONDO, LLC is the owner of that tract of land out of the R. Bebee Survey, Abstract
Number 29, in the City of Sanger, Denton County, Texas, and being all of Lot 2 of IESI Industrial Park, an addition in the City of
Sanger, Denton County, Texas, according to the plat recorded under Cabinet U, Slide 75, Plat Records, Denton County, Texas,
(P.R.D.C.T.), said Lot 2 being conveyed by deed to Penthouse Speedway Condo, LLC as recorded under Document Number
2020-190468, Official Public Records, Denton County, Texas, (O.P.R.D.C.T.), the subject tract being more particularly described
by metes and bounds as follows (bearings are based on State Plane Coordinate System, Texas North Central Zone (4202)
North American Datum of 1983 (NAD '83)):
BEGINNING at a 1/2 inch rebar with cap stamped, “EAGLE SURVEYING” found for the northwest corner of said Lot 2 and the
herein described tract;
THENCE with the perimeter and to the corners of said Lot 2, the following calls:
1.South 88 degrees 38 minutes 21 seconds East, a distance of 437.83 feet to a 1/2 inch rebar with cap stamped, “EAGLE
SURVEYING” found;
2.South 03 degrees 22 minutes 27 seconds East, a distance of 290.68 feet to a 1/2 inch rebar with cap stamped,
“HAT-2901” found;
3.North 88 degrees 42 minutes 08 seconds West, a distance of 461.51 feet to a 1/2 inch rebar found;
4.North 01 degrees 17 minutes 52 seconds East, a distance of 290.20 feet, returning to the POINT OF BEGINNING and
enclosing 2.993 acres (130,328 square feet) of land, more or less.
STATE OF TEXAS §
COUNTY OF ______________§
NOW, THEREFORE, KNOW ALL MEN BY THESE PRESENTS
THAT, PENTHOUSE SPEEDWAY CONDO, LLC, acting herein by and through its duly authorized officer, does hereby adopt this
plat designating the hereinabove described property as (lot/block/subdivision), an addition to the City of Sanger, Texas, and
does hereby dedicate to the public use forever by fee simple title, free and clear of all liens and encumbrances, all streets,
thoroughfares, alleys, fire lanes, drive aisles, parks, and watercourses, and to the public use forever easements for sidewalks,
storm drainage facilities, utilities and any other property necessary to serve the plat and to implement the requirements of
the subdivision regulations and other City codes and do hereby bind ourselves, our heirs, successors and assigns to warrant
and to forever defend the title on the land so dedicated. Further, the undersigned covenants and agrees that he/she shall
maintain all easements and facilities in a state of good repair and functional condition at all times in accordance with City
codes and regulations. No buildings, fences, trees, shrubs, or other improvements or growths shall be constructed or placed
upon, over, or across the easements as shown, except that landscape improvements may be installed, if approved by the City
of Sanger. The City of Sanger and public utility entities shall have the right to access and maintain all respective easements
without the necessity at any time of procuring permission from anyone.
WITNESS my hand this the ______ day of ____________________ 20___
___________________________________
PENTHOUSE SPEEDWAY CONDO, LLC, Owner (Authorized Agent)
STATE OF TEXAS §
COUNTY OF _______________§
BEFORE ME, the undersigned, a Notary Public in and for the State of Texas, on this day personally
appeared_________________, known to me to be the person whose name is subscribed to the foregoing instrument and
acknowledged to me that he executed the same as for the purpose and consideration therein expressed, and in the capacity
therein stated.
_____________________
Notary Public in and for
the State of Texas
SURVEYOR'S CERTIFICATE
STATE OF TEXAS §
COUNTY OF TARRANT §
I, John H. Barton III, a Registered Professional Land Surveyor of the State of Texas, do hereby certify that the map shown
hereon accurately represents the described property as determined by a survey made on the ground under my direction and
supervision.
Date of Plat/Map: December 15, 2022
_______________________________________________________
John H. Barton III, RPLS# 6737 Date
STATE OF TEXAS §
COUNTY OF TARRANT §
BEFORE ME, the undersigned, a Notary Public in and for the State of Texas, on this day personally appeared
_______________________, known to me to be the person whose name is subscribed to the foregoing instrument and
acknowledged to me that he/she executed the same as for the purpose and consideration therein expressed, and in the
capacity therein stated.
_____________________
Notary Public in and for
the State of Texas
OWNER
PENTHOUSE SPEEDWAY CONDO, LLC
1920 E. S.H. 114
SOUTHLAKE, TX 76092
ENGINEERPLAT NOTES:
1.All lots comply with the minimum size requirements of the zoning district.
2.This property may be subject to charges related to impact fees and the
applicant should contact the City regarding any applicable fees due.
3.All common areas, drainage easements, and detention facilities will be
owned and maintained by the HOA/POA. Any common area within the
City’s right-of-way will require a facilities agreement, to be reviewed and
approved by the City.
4.Notice – selling a portion of this addition by metes and bounds is a
violation of City ordinance and State Law and is subject to fines and
withholding of utilities and building permits.
5.This plat does not alter or remove existing deed restrictions, if any, on
this property.
6.Minimum finished floor elevations are at least 2 feet above the 100 year
flood plain.
7.The purpose of this replat is to dedicate easements within existing Lot 2.
40
Item 6.
City of Sanger
201 Bolivar / P.O Box 1729
Sanger, TX 76266
940-458-2059 (office) www.sangertexas.org Effective Date: 02/11/2020
201 Bolivar Street/PO Box 1729 * Sanger, TX 76266
940-458-2059(office) www.sangertexas.org
SUBDIVISION APPLICATION
Preliminary
Plat Minor
Plat
Final
Plat/Replat
Amended Plat
Vacating Plat
Conveyance
Plat
Applicant Owner (if different from applicant)
Name: Name:
Company: Company:
Address: Address
City, State, Zip: City, State, Zip:
Phone Phone:
Fax: Fax:
Email: Email:
Submittal Checklist
Pre-Application Conference (Date: / / )
One (1) Paper Copy of Plat (24”x36”, folded to 1/4 size)
Letter of Intent
Non-Refundable Application Fee (Check Payable to City of
Sanger)
Application Form (Signed by Owner)
Applicable Plat Checklist (Completed)
Additional Required Documents/Traffic & Drainage Studies etc.
One (1) PDF Copy of all Documents Provided on a CD/DVD or
Emailed to development@sangertexas.org
Supporting Materials (List if provided):
R Number(s):
Owner’s Signature Date
Applicant’s Signature Date
Office Use: Reviewed by Director of Development Services / /
X
Kyle McCage
Kirkman Engineering
5200 State Highway 121
Colleyville, TX 76034
817-488-4960
n/a
kyle.mccage@trustke.com
x 02 2021
x
x
x
x
x
x
Civil construction plans are under review as
Sanger Industrial Addition
12/20/22
Penthouse Speedway Condo, LLC
1920 E State Highway 114
Southlake, TX 76092
Clint Cox
469-628-6587
n/a
clint.cox@siskcapital.com
12/22/2022
41
Item 6.
City of Sanger
201 Bolivar / P.O Box 1729
Sanger, TX 76266
940-458-2059 (office) www.sangertexas.org
Effective Date: 02/11/2020
201 Bolivar Street/PO Box 1729 * Sanger, TX 76266
940-458-2059(office) www.sangertexas.org
SUBDIVISION PACKET
A Plat subdividing land within the city limits of Sanger or within Sanger Extraterritorial Jurisdiction (ETJ)
requires the approval of the City of Sanger. The platting process involves the preparation of one or more
plats by the landowner, a review by staff, and consideration by the Planning & Zoning Commission and City
Council.
PLAT TYPES: There are seven different types of plats, each with their own function.
• Preliminary Plat – A preliminary plat is required for most subdivisions, particularly those providing for
dedication of public right-of-way and construction of public improvements. It is used to determine
the layout of the proposed development.
• Final Plat – A final plat will follow a preliminary plat to specify in detail the arrangement of lots, the
dedication of public right-of-way, and the provision of public improvements and services.
• Replat – A replat revises an existing plat and is controlling over the preceding plat. A public hearing is
required for replat.
• Minor Plat – A minor plat is one creating three lots or fewer, and not requiring the dedication of
right-of-way or construction of improvements. Minor plats can be approved with the preparation of
a preliminary plat.
• Amended Plat – An amended plat revises a previously platted lot to correct an error or add or modify
a feature. Amending plats cannot increase the number of lots.
• Conveyance Plat – A conveyance plat may be used to convey the property or interests therein. It may
also be used in lieu of a final plat to record a subdivision or property. A conveyance plat is an interim
step in the subdivision of land and shall contain a notation that indicates that no development is
intended.
• Vacating Plat – A vacating plat removes/vacates the plat covering a tract of land before any lot in the
plat is sold. The plat is vacated when a signed, acknowledged instrument declaring the plat vacated
is approved and recorded in the manner prescribed for the original plat.
SUBMISSION REQUIREMENTS: The submittal requirements for each kind of plat are included in this packet.
SUBMISSION SCHEDULE: Plats must be submitted during regular business hours before the submittal cut-
off date for each Planning and Zoning (P&Z) Commission meeting. Before the application is filed, a
mandatory completeness check is required. Application are encouraged to be submitted at least 9 days
prior to the submittal cut-off date for completeness check. Plat will be scheduled for P&Z Commission and
for City Council according to The Schedule for Planning Applications on the City’s website. Staff will provide
review comments within 2 weeks of application filing. All corrections must be made prior to the P&Z
Commission meeting. If more time is needed for revisions/corrections, the applicant and owner must
submit a request in the form of a signed letter a week before the P&Z meeting date. Staff may extend the
application review time for up to 25 days upon receipt of the signed letter.
42
Item 6.
City of Sanger
201 Bolivar / P.O Box 1729
Sanger, TX 76266
940-458-2059 (office) www.sangertexas.org
Effective Date: 02/11/2020
201 Bolivar Street/PO Box 1729 * Sanger, TX 76266
940-458-2059(office) www.sangertexas.org
APPLICATION FEES: The non-refundable application fee covers part of the cost for the city to review and
act on the plat application.
• Residential Preliminary or Final Plat / Replat
$400.00 + $6.00 per lot < 10
$500.00 + $10.00 per lot > 10
$500.00 + $15.00/acre for plats with lot sizes of one acre or more
• Commercial Preliminary or Final Plat / Replat
Less than five (5) acres - $500.00 + $15.00 per acre
Five (5) acres to less than 25 acres - $600.00 + $15.00 per acre
25 acres to less than 100 acres - $950.00
100 acres or more - $950.00 + $5.00 per acre
• Minor Plat - $400.00 + $3.00 per lot, or $15.00 per acre for lots larger than 1 acre
• Amended Plat - $200.00 + $3.00 per lot
• Conveyance Plat - $200.00 +$3.00 per lot
• Vacating Plat - $200.00
SUBDIVISION PROCEDURE
The process for subdividing land involved the following steps:
1. Pre-Application Conference: Prior to filing of a plat, the owner must consult with the Director of
Development Services, and other City staff concerning compliance with all applicable ordinances
and regulations, and the provision of adequate infrastructure and public services. Also, the
applicable application review and approval procedure for the plat will be identified.
2. Completeness Check: The applicant will provide all required documents and fees along with
the signed application and applicable checklist for a completeness check 9 days prior to the
submittal cut-off date. Staff will review the documents for completeness of items listed on the
checklists and provide feedback about any additional information or documents required
from the applicant. Applications deemed to be incomplete at the time of submittal cut-off
date will be returned to the applicant without the application being filed.
3. Submission: Upon determination of application completeness, the application will be
considered filed with the Development Services Department. The application submittal cut-off
date will be considered as the application filing date and as the first day of review of
application.
4. Review: City Staff will review the plat for compliance with the Subdivision Ordinance and other city
requirements, and provide comments within 2 weeks of application submittal. The applicant may
need to make changes and revisions to the plat or supporting materials. The applicant must
provide additional copies of the plat if requested by staff prior to the P&Z Commission and City
Council meetings.
43
Item 6.
City of Sanger
201 Bolivar / P.O Box 1729
Sanger, TX 76266
940-458-2059 (office) www.sangertexas.org
Effective Date: 02/11/2020
201 Bolivar Street/PO Box 1729 * Sanger, TX 76266
940-458-2059(office) www.sangertexas.org
5. Planning & Zoning Commission: The Planning & Zoning Commission will consider the plat at a
regular meeting. The meeting date will be determined at the time of application filing. Staff will
recommend approval of the project only if all of staff’s comments have been addressed prior to
P&Z meeting. If the plat is approved, it will be forwarded to the City Council. If the plat is denied,
applicant may resubmit a response addressing all of staff’s comments prior to City Council
meeting date.
6. City Council: The City Council will consider the plat at a regular meeting. The meeting date will
be determined at the time of application filing. Staff will recommend approval of the project
only if all of staff’s comments have been addressed prior to City Council meeting. City Council’s
action will be final. If the plat is denied, staff will provide written statement with specific
reasons for disapproval. The applicant may resubmit a response satisfying all reasons for
disapproval. Upon resubmittal of the applicant’s response, City will have 15 days to either
approve or deny the plat. If plat is denied again, the applicant will be required to start a new
application. If approved, applicant may schedule a pre-construction meeting with City staff.
7. Filing for Recordation: Following approval by the City Council, and construction and acceptance
of any required public improvements, the plat will be signed by the P&Z Chairman, Mayor, sealed
by the City Secretary, and filed for record with Denton County. A Plat Execution Package
containing the following must be provided to the Development Services to file the plat for record
with Denton County:
a. three (3) full-sized (24”x36”) notarized copies of the plat with all signatures (except P&Z
Chairman, Mayor and City Secretary), seals, stamps or other validation/certifications of
work as applicable in accordance with State law and local requirements, folded to 8.5”x11”
with the title block facing outwards;
b. recent original certified & sealed tax certificates showing $0.00 amount due;
c. $100.00 plat filing fee;
Note: Preliminary Plats are not filed for record
Consult the Schedule of Planning Application for submittal dates and corresponding meeting dates of the
Planning & Zoning Commission and City Council.
44
Item 6.
City of Sanger
201 Bolivar / P.O Box 1729
Sanger, TX 76266
940-458-2059 (office) www.sangertexas.org
Effective Date: 02/11/2020
201 Bolivar Street/PO Box 1729 * Sanger, TX 76266
940-458-2059(office) www.sangertexas.org
SUBMITTAL REQUIREMENTS & PROCESS
All plat submittals must include the correct copies of the plat, the completed and signed application form,
plat checklist, the application fee, and a Letter of Intent. Some plats may also require additional copies of
the plat and/or other supplementary materials. The Pre-Application Conference with city staff will
determine the specific submittal requirements for each applicant.
PLAT: The applicant must provide one (1) copy of the plat, printed on a 24”x36” paper, folded to one
quarter that size, along a pdf copy of the plat provided on a CD/DVD or emailed to
development@sangertexas.org. Additional copies of the plat may be required for staff, depending on the
nature of the plat. Additional copies may be required prior to the Planning & Zoning Commission and
City Council meetings.
APPLICATION FORM: The application form must be completed and signed by the owner(s).
PLAT CHECKLIST: Each item on the applicable plat checklist must be check marked as completed and
submitted along with the application form.
APPLICATION FEE: The required application fee must be provided by check made payable to the City of
Sanger. If the submittal is complete, the payment will be accepted. If the submittal is incomplete, the
check will be returned with the other materials.
LETTER OF INTENT: Each plat submittal must include a Letter of Intent which provides the following:
• The subdivider’s name and address
• The contact information of the person(s) preparing the submitted documents
• The designated point of contact for future correspondence
• The intent of the plat application
• A brief description of the location, land area, particulars as to the intended use(s) of the property, and
any intended future development on the property
• A request that the plat be reviewed and considered by the appropriate approval body
SUBMITTAL PROCESS: The applicant shall submit the plat application to the Department of Development
Services as indicated by the Schedule of Planning Application. A plat application submittal is accepted by
the City when the Director of Development Services has certified to the applicant that a complete submittal
providing adequate information for a comprehensive review has been received. No plat application will be
considered submitted with the city until and unless the prescribed application fees have been paid. All
original plat application documents must be submitted to the Department of Development Services, as
well as emailed to development@sangertexas.org.
45
Item 6.
City of Sanger
201 Bolivar / P.O Box 1729
Sanger, TX 76266
940-458-2059 (office) www.sangertexas.org
Effective Date: 02/11/2020
201 Bolivar Street/PO Box 1729 * Sanger, TX 76266
940-458-2059(office) www.sangertexas.org
PRELIMINARY PLAT CHECKLIST
The plat shall be drawn to a scale of not more than two hundred feet to the inch (1” = 200’). The information
to be included and the procedure for submittal are as follows:
Legal Description (Metes and Bounds) with total acreage
Describe and locate all permanent survey monument, pins, and control points and tie and reference
the survey corners at two points to the Texas State Plane Coordinate System North Central Zone 1983-
1999 datum. The Point of Beginning (POB) shall be clearly marked including State Plane Coordinates,
NAD 83.
An accurate location of at least two (2) corners of the subdivision with reference to original corners of
the original survey of which the subdivision is a part or an existing permanent monument to an
approved and recorded plat or permanent markers established by and approved by the City
Engineer.
North Arrow
Scale (both graphic and written) appropriate for the level of detail and not more than two hundred feet
to the inch (1”=200)
Legend for any symbols used
Location/Vicinity Map showing the location of the subject property, existing and proposed streets
and thoroughfares
covering an area at least one thousand feet (1,000’) outside the proposed subdivision.
Title Block with the following information:
1) Plat Type (ex: “Final Plat”, “Preliminary Plat”, etc.)
2) Name of the proposed development/addition
3) Total number of lots and HOA/Open Space lots
4) Survey name and abstract number
5) Gross acreage
6) Right-of-Way acreage, if dedicated
7) Date of preparation and subsequent revisions
Block with name(s), address, phone number, and email of preparer, owner, developer, engineer,
and/or surveyor
46
Item 6.
City of Sanger
201 Bolivar / P.O Box 1729
Sanger, TX 76266
940-458-2059 (office) www.sangertexas.org
Effective Date: 02/11/2020
201 Bolivar Street/PO Box 1729 * Sanger, TX 76266
940-458-2059(office) www.sangertexas.org
Existing Features:
1) Location and dimension of all boundary lines (accurate in scale) with dimensions and
bearings including lot lines, building lines, and City Limits lines (if any).
2) The location, widths, and names of all existing or platted streets or other public areas, parks,
existing permanent structures, land dedicated within or contiguous to the subject property,
railroads, rights-of-way, easements, and other important features, such as abstract lines,
political subdivision or corporation lines, and school district boundaries.
3) Existing sewer mains, water mains, drainage culverts or other underground structures within
the tract and immediately adjacent thereto with pipe sizes, grades, locations and dimensions
indicated.
4) Contours with intervals of two feet (2’) or less, referred to mean sea level datum. In areas
where the terrain is relatively flat, supplementary contours shall be shown so that the average
horizontal distance between said lines does not exceed two hundred feet (200’).
5) Subdivision name of adjacent properties (P.R.D.C.T) or ownership information for adjacent
un-platted properties (D.R.D.C.T.) with recording information.
6) Location of existing fire hydrants and fire lanes
PRELIMINARY PLAT CHECKLIST (cont.)
New Features:
1) The layout, names, and widths (from centerline to edge as well as from edge to edge) of the
proposed streets, fire lanes, drives, alleys and easements.
2) Length and radii of all street segments
3) Curve table for all streets, drives, and alleys
4) Acreage or square footage of right-of-way dedicated should be shown, including corner clips
and deceleration/turn lanes on the plat
5) Lot and block numbers (lot number are numbers; and block numbers are letters), square
footage, and other description according to the real estate records of the city or county
auditor and recorder; also, designation of the proposed uses of land within the subdivision.
6) All parcels of land intended to be dedicated for public use or reserved in the deeds for the use
of all property owner(s) in the proposed subdivision, together with the purpose or limitations
of such reservations.
7) The layout, numbers, set-back lines, and approximate dimensions of proposed lots, blocks,
parks, etc.
8) Location of proposed fire hydrants and fire lanes
9) USPS Postmaster approved location of mailboxes (if cluster mailboxes)
10) Proposed building lines with square footage and proposed use
11) Proposed Parking layout
Table showing the following information:
1) Listing of the lots with square footage, and the associated lot widths at the front building line
2) Square footage of total building footprint and of each land use (if known)
3) Number of required and provided parking spaces
4) Required and provided total landscaped area and front yard landscaped area
47
Item 6.
City of Sanger
201 Bolivar / P.O Box 1729
Sanger, TX 76266
940-458-2059 (office) www.sangertexas.org
Effective Date: 02/11/2020
201 Bolivar Street/PO Box 1729 * Sanger, TX 76266
940-458-2059(office) www.sangertexas.org
Existing and proposed FEMA 100-year floodplain boundaries and elevation. Include minimum
finished floor elevations (minimum 2 feet above the 100-year elevation) of all lots adjacent to
floodplain. If the site does not contain a floodplain, note that: “No 100-year floodplain exists on the
site.” A Floodplain reclamation study will be required with Final Plat if necessary.
Submittals for preliminary plats shall include plans, documents, and information adequate for the
review of the provision of public improvements to the properties involved. This includes but is not
limited to streets, water services, wastewater services, franchise utilities, street lighting, and
stormwater detention (ex: preliminary drainage plans, preliminary utility plans, floodplain study,
traffic impact study etc.).
Two (2) copies of the typical cross-sections of proposed streets showing the width of pavement, type
of pavement, and location and widths of sidewalks when not in conformance with standard details.
Approval Block:
The following notice shall be placed on the face of each preliminary plat by the subdivider:
“Preliminary Plat for Review Purposes Only”
The following certificates shall be placed on the preliminary plat by the
subdivider: Approved for Preparation of Final Plat
City of Sanger, TX Date
Planning & Zoning Commission
48
Item 6.
City of Sanger
201 Bolivar / P.O Box 1729
Sanger, TX 76266
940-458-2059 (office) www.sangertexas.org
Effective Date: 02/11/2020
201 Bolivar Street/PO Box 1729 * Sanger, TX 76266
940-458-2059(office) www.sangertexas.org
FINAL, REPLAT, MINOR, AMENDED, AND CONVEYANCE PLAT CHECKLIST
The Plat shall be drawn to a scale of not more than two hundred feet to the inch (1” = 200’).
The boundary marked with heavy weighted lines with accurate distances and bearings, a metes and
bounds description of the boundary (error of closure shall not exceed one (a) in fifty thousand
(50,000) for the plat boundary), exact acreage to hundredths, and the exact location and width of all
existing or recorded rights-of-way intersecting the boundary of or bordering on the tract. One (1)
copy of the traverse closure sheet shall be enclosed.
True bearings and distances to the nearest established street lines, official monuments or
subdivision corner, which shall be accurately described on the plat. Municipal, township, county or
abstract survey lines shall be accurately tied to the lines of the subdivision by the distances and
bearings, where applicable.
Describe and locate all permanent survey monument, pins, and control points and tie and reference
the survey corners at two points to the Texas State Plane Coordinate System North Central Zone 1983-
1999 datum. The Point of Beginning (POB) shall be clearly marked including State Plane Coordinates,
NAD 83.
An accurate location of at least two (2) corners of the subdivision with reference to original corners of
the original survey of which the subdivision is a part or an existing permanent monument to an
approved and recorded plat or permanent markers established by and approved by the City
Engineer.
Subdivision name of adjacent properties (P.R.D.C.T) or ownership information for adjacent unplatted
properties (D.R.D.C.T.) with recording information.
An accurate location of the subdivision in reference to the deed records of the county which shall
include the volume and page of the deed of the property to be subdivided.
If the property owner information does not match the Denton Central Appraisal District record, then
information related to the purchase must be provided.
The exact layout, including:
1) Street and/or alley names
2) The length of all arcs, radii, internal angles and points of curvature, length and bearing of the
tangents
3) All existing and proposed easements for right-of-way, public services, utilities or any other
easements and any limitations of the easements
4) Show centerline of existing streets. Dimensions from centerline to edges of existing and
proposed right-of-way on both sides of the centerline.
5) All lot number and lines, with accurate dimensions in feet and hundredths and with bearings
and angles to street and alley lines to the nearest second
The accurate location, material, and approximate size of all monuments.
49
Item 6.
City of Sanger
201 Bolivar / P.O Box 1729
Sanger, TX 76266
940-458-2059 (office) www.sangertexas.org Effective Date: 02/11/2020
201 Bolivar Street/PO Box 1729 * Sanger, TX 76266
940-458-2059(office) www.sangertexas.org
The accurate outline description of all property which is offered for dedication for public use, such as
parks, etc., with the purpose indicated thereon, and all property that may be reserved by deed
covenant for the common use of the property owners in the subdivision.
A signed and notarized copy of private restriction (if any), that are filed for record in the office of the
County Clerk shall be provided with the Final Plat.
Name and addresses of the owner, subdivider, engineer, and surveyor.
FINAL, REPLAT, MINOR, AMENDED, AND CONVEYANCE PLAT CHECKLIST
(cont.)
North point, written and graphic scale, and date.
3”x3” recording box at the lower right hand corner.
A Title Block with the following information shall be provided on each page:
1)Plat Type (ex: “Final Plat”, “Preliminary Plat”, etc.)
2)Name of the proposed development/addition/subdivision
3)Total number of lots and HOA/Open Space lots
4)Survey name and abstract number
5)Gross acreage
6)Right-of-Way acreage, if dedicated
7)Date of preparation and subsequent revisions
Standard Notation to be added on the plat:
1)“All lots comply with the minimum size requirements of the zoning district.”
2)“This property may be subject to charges related to impact fees and the applicant should
contact the City regarding
any applicable fees due.”
3)“All common areas, drainage easements, and detention facilities will be owned and
maintained by the HOA/POA. Any common area within the City’s right-of-way will require a
facilities agreement, to be reviewed and approved by the City.”
4)“Notice – selling a portion of this addition by metes and bounds is a violation of City ordinance
and State Law and is subject to fines and withholding of utilities and building permits.”
5)“This plat does not alter or remove existing deed restrictions, if any, on this property.”
6)“Minimum finished floor elevations are at least 2 feet above the 100 year flood plain.”
7)“The subject property does not lie within a 100 – year floodplain according to Community Panel
No. ,
dated , of the National Flood Insurance Rate Maps for Denton County, Texas.”
8)“The purpose of this plat is [state the purpose] ”
9)“Bearings are based on the State Plane Coordinate System, Texas North Central Zone (4202),
North American
Datum of 1983 (NAD ‘83)”
50
Item 6.
City of Sanger
201 Bolivar / P.O Box 1729
Sanger, TX 76266
940-458-2059 (office) www.sangertexas.org Effective Date: 02/11/2020
201 Bolivar Street/PO Box 1729 * Sanger, TX 76266
940-458-2059(office) www.sangertexas.org
The name, address and phone number of all utilities providing service to the development is
required. A signature from each provider or a will-serve letter, signifying their ability to provide
service to the subdivision is required.
Location map showing existing and proposed streets and thoroughfares covering an area at least one
thousand feet (1000’)
outside the proposed subdivision.
One paper copy (24”x36”) and one soft copy (pdf) of approved civil/construction plans, along with
GIS/CAD files for all approved public improvements on a CD/DVD.
For Conveyance Plats Only: All conveyance plats must be titled “Conveyance Plat” and carry the
following text:
“A conveyance plat is a record of property approved by the City of Sanger for the purpose of sale or
conveyance in its entirety or interests thereon defined. No building permit may be issued, nor
development begin, nor permanent public utility service provided until a final plat is approved, filed
of record and public improvements are accepted in accordance with the City of Sanger Code of
Ordinances. Selling a portion of this property by metes and bounds, except as shown on an approved,
filed and accepted conveyance plat, final plat or replat is a violation of the state law.”
51
Item 6.
City of Sanger
201 Bolivar / P.O Box 1729
Sanger, TX 76266
940-458-2059 (office) www.sangertexas.org Effective Date: 02/11/2020
201 Bolivar Street/PO Box 1729 * Sanger, TX 76266
940-458-2059(office) www.sangertexas.org
FINAL, REPLAT, MINOR, AMENDED, AND CONVEYANCE PLAT CHECKLIST
Certification by a registered public surveyor or licensed state land surveyor, registered in the State of Texas to
the effect that the plat represents a survey made by him or under his direct supervision and that all monuments
shown thereon have been verified and actually exist, and that their location, size, and material are correctly
shown. Such surveyor’s certificate may be prepared as follows:
“State of Texas
County of Denton
I hereby certify that this plat is true and correct and was prepared from an actual survey of the property made
on the ground under my supervision.
(Engineer or Surveyor’s Seal)
Licensed Professional Engineer OR
Registered Public Land Surveyor Texas R.P.L.S. No. Date”
A certificate of ownership and dedication of all streets, alleys, parks, and playgrounds to public use forever,
signed and acknowledged before a notary public, by the owner or authorized representative and lien holder of
the land, and a complete and accurate description of the land subdivided and the streets dedicated. Such
owner’s certificate may be prepared as follows:
“State of Texas
County of Denton
I (we), the undersigned, owner(s) of the land shown on this plat within the area described by metes and bounds
as follows:
(Metes and Bounds Description of Boundary)
NOW, THEREFORE, KNOW ALL PERSONS BY THESE PRESENTS:
THAT , acting herein by and through its duly authorized officer, does hereby adopt this plat
designating the hereinabove described property as (lot/block/subdivision), an addition to the City of
Sanger, Texas, and does hereby dedicate to the public use forever by fee simple title, free and clear of all liens
and encumbrances, all streets, thoroughfares, alleys, fire lanes, drive aisles, parks, and watercourses, and to the
public use forever easements for sidewalks, storm drainage facilities, utilities and any other property necessary
to serve the plat and to implement the requirements of the subdivision regulations and other City codes and
do hereby bind ourselves, our heirs, successors and assigns to warrant and to forever defend the title on the
land so dedicated. Further, the undersigned covenants and agrees that he/she shall maintain all easements
and facilities in a state of good repair and functional condition at all times in accordance with City codes and
regulations. No buildings, fences, trees, shrubs, or other improvements or growths shall be constructed or
placed upon, over, or across the easements as shown, except that landscape improvements may be installed, if
approved by the City of Sanger. The City of Sanger and public utility entities shall have the right to access and
maintain all respective easements without the necessity at any time of procuring permission from anyone.
WITNESS MY HAND this day of _, 20 .
, Owner
, Title and Company (if applicable)”
52
Item 6.
City of Sanger
201 Bolivar / P.O Box 1729
Sanger, TX 76266
940-458-2059 (office) www.sangertexas.org
Effective Date: 02/11/2020
201 Bolivar Street/PO Box 1729 * Sanger, TX 76266
940-458-2059(office) www.sangertexas.org
FINAL, REPLAT, MINOR, AMENDED, AND CONVEYANCE PLAT CHECKLIST
(cont.)
“State of Texas
County of Denton
Before me, the undersigned authority, on this day personally appeared, known to me to be the
person whose name is subscribed to the foregoing instrument, and acknowledged to me that
he/she executed the same for the purposes and considerations therein expressed and in the
capacity therein stated.
Given under my hand and seal of office this day of , 20 .
Notary Public in and for the State of Texas
Type or Print Notary’s Name
My Commission Expires .”
The following certificate shall be included on the plat in a manner that will allow the signatures of
the designated officials and the affixing of the City Seal.
“Approved and Accepted
_
Chairman, Planning & Zoning Commission
Dat
e City of Sanger, TX
Mayor Date
City of Sanger, TX
Attested by
City Secretary Date
City of Sanger, TX”
53
Item 6.
City of Sanger
201 Bolivar / P.O Box 1729
Sanger, TX 76266
940-458-2059 (office) www.sangertexas.org
Effective Date: 02/11/2020
201 Bolivar Street/PO Box 1729 * Sanger, TX 76266
940-458-2059(office) www.sangertexas.org
VACATING PLAT CHECKLIST
A letter signed by the property owner(s) indicating their consent. If the property owner information
does not match the Denton Central Appraisal District record, then information related to the
purchase must be provided.
Current tax certificate(s) indicating all taxes for the subject property have been paid to the current
year (available from Denton Central Appraisal District). Tax statements printed from the DCAD
website (pdf) are acceptable in lieu of the original certificate(s). Original tax certificates shall be
required for recording the plat at the County.
Letter of Intent that should include
1) Existing legal description (subdivision name, lot(s), block(s));
2) Original legal description that will be resumed upon plat vacation;
3) Explain the location of all structures on the property.
4) The contact information of the person(s) preparing the submitted documents
5) The designated point of contact for future correspondence
6) The intent of the plat application
7) A request that the plat be reviewed and considered by the appropriate approval body
A signed and notarized affidavit filled out completely and accurately by the land owner for the type pf
plat that is proposed to be vacated must be included.
A map(s) showing the location, size, use and arrangement of all buildings/structures showing height
in stories and feet, total floor area, total square feet of ground area coverage of existing buildings
which will remain, if any, and the location, designation and total area of all usable open space.
Vicinity Map
54
Item 6.
KIRKMAN ENGINEERING :: 5200 State Highway 121, Colleyville, TX 76034 Ph: 817-488-4960 :: TBPE Firm #15874
Page 1 of 1
Kirkman Engineering
5200 State Highway 121
Colleyville, TX 76034
817.488.4960
December 20, 2022
City of Sanger
Development Services
201 Bolivar St/PO Box 1729
Sanger, TX 76266
RE: Letter of Intent – Sanger Industrial Replat
Subdivider’s Information:
Penthouse Speedway Condo, LLC
1920 E State Highway 114
Southlake, TX 76092
Applicant and Contact:
Kyle McCage, P.E., CFM
Kirkman Engineering
5200 State Highway 121
Colleyville, TX 76034
817-488-4960
Kyle.mccage@trustke.com
The intent of this plat application is to support a replat of Lot 2, IESI Industrial Park as recorded in Cabinet
U, Slide 75, Plat Records, Denton County, Texas. The replat is necessary to add an on-site drainage
easement and a firelane, access, and utility easement.
This project is a 2.9-acre industrial development occurring on undeveloped land. It is a one phase
development supporting 8 buildings ranging from 5,100 square feet to 6,000 square feet. Intended uses
are consistent with the recently assigned Industrial (I-1) zoning category. In addition to the buildings are
supporting utility infrastructure and concrete paving.
It is requested that the replat be reviewed and considered by the appropriate approval body.
Please contact me directly at 817-488-4960 if you have any questions.
Sincerely,
Kyle McCage, P.E., CFM
55
Item 6.
3803 Parkwood Blvd. Suite 800
Frisco, Texas 75034
(214) 618-4570
Fax (214) 739-0095
February 2, 2023
AVO 37449.004
Ms. Ramie Hammonds
Development Services Director/Building Official
City of Sanger
201 Bolivar Street
P.O. Box 1729
Sanger, Texas 76266
Re: Utility Road – Re-plat
First Review
Dear Ms. Hammonds,
Halff Associates, Inc. was requested by the City of Sanger to provide a first review of the Re-plat
for the IESE industrial Park located at Utility Road and Burlington Northern Santa FE Railroad.
The property is located within the City of Sanger limits. The plat was prepared by Barton Chapa
Surveying and is dated December 2022.
A preliminary review of the document was performed and the following comments apply:
1. Easements for detention ponds need to be shown and labeled.
2. Show private drainage easement for all channels
3. Show any additional DE for roadside ditches
4. Show Min FFE
5. Determine the 100-yr fully developed floodplain for ditch along the RR and verify if it
reaches site (ie overflow across access road, etc) If it reaches site, provide a floodplain
easement (floodplain +10' buffer).
6. Verify size of drainage easements along perimeter, it does not appear to contain flow. DE
must extend beyond top of bank.
7. City will need to verify easement provided matches what is needed in the plans. Previous
plans showed grading outside the property.
8. Show and label offsite DE by separate instrument for proposed swale.
9. Show appropriate setbacks.
If you have any questions or need additional information, please do not hesitate to call me at
(817) 764-7480.
Sincerely,
HALFF ASSOCIATES, INC.
TBPELS Firm No. 312
Steven D. Templer, P.E.
Attachments: Markups
56
Item 6.
LOT 2-R
IESI INDUSTRIAL PARK
2.993 ACRES
130,382 SQUARE FEET
LOT 1
IESI INDUSTRIAL PARK
CABINET U, SLIDE 75,
P.R.D.C.T.
LOT 1, BLOCK A
AUSTIN ADDITION
CABINET W, SLIDE 353
P.R.D.C.T.
TRACT 5
REDI-MIX, INC
VOL. 93, PAGE 48556
D.R.D.C.T.
UTILITY ROAD
(60' ROW PER VOL. 1135, PG. 939, D.R.D.C.T.)
(REMAINDER)
EAGLE FARMS INC.
VOL. 971, PAGE 2
D.R.D.C.T.
N88°42'08"W 461.51'
N
0
1
°
1
7
'
5
2
"
E
2
9
0
.
2
0
'
S88°38'21"E 437.83'
S
0
3
°
2
2
'
2
7
"
E
2
9
0
.
6
8
'
N88°42'08"W
40.14'
B
U
R
L
I
N
G
T
O
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
R
A
I
L
R
O
A
D
(
1
0
0
'
R
O
W
A
S
S
H
O
W
N
O
N
C
A
B
I
N
E
T
U
,
S
L
I
D
E
7
5
,
P
.
R
.
D
.
C
.
T
.
)
ED AUSTIN FAMILY TRUST AND THE AUSTIN TRUST
VOL. 2019, PG. 82956
D.R.D.C.T.
D
D
D
D
FINAL PLAT
LOT 2-R, IESI INDUSTRIAL PARK
BEING A REPLAT OF LOT 2, IESI INDUSTRIAL PARK
AN ADDITION IN THE CITY OF SANGER ACCORDING
TO THE PLAT RECORDED UNDER
CABINET U, SLIDE 75, P.R.D.C.T.
1 LOT | 2.993 ACRES OUT OF THE R. BEBEE SURVEY,
ABSTRACT #29
CITY OF SANGER, DENTON COUNTY, TEXAS
PREPARED DECEMBER, 2022
VICINITY MAP - NOT TO SCALE
SITE
PRELIMINARY
THIS DOCUMENT SHALL NOT BE RECORDED FOR ANY PURPOSE
AND SHALL NOT BE USED, VIEWED, OR RELIED UPON AS A FINAL
SURVEY DOCUMENT December 15, 2022
POINT OF
BEGINNING
LEGEND OF ABBREVIATIONS
·D.R.D.C.T. DEED RECORDS, DENTON COUNTY, TEXAS
·P.R.D.C.T.PLAT RECORDS, DENTON COUNTY, TEXAS
·O.P.R.D.C.T.OFFICIAL PUBLIC RECORDS, DENTON COUNTY, TEXAS
·DOC.#DOCUMENT NUMBER
·C.M.CONTROLLING MONUMENT
·SQ. FT.SQUARE FEET
·ROW RIGHT OF WAY
·CRS CAPPED REBAR SET
SHEET:
Z:\Project Data\Survey\001 - Kirkman Engineering\2020\167 - Sanger Property\Drawings
SURVEYOR'S NOTES:
1.Bearings are based on the State Plane Coordinate System, Texas North
Central Zone (4202) North American Datum of 1983 (NAD '83),
distances are surface with a combined scale factor of 1.00015063.
2.This property lies within Zone "X" of the Flood Insurance Rate Map for
Denton County, Texas and Incorporated Areas, map no. 48121C0070G,
with an effective date of April 18, 2011, via scaled map location and
graphic plotting.
3.Monuments are found unless specifically designated as set.
4.Elevations (if shown) are North American Vertical Datum of 1988
(NAVD '88).
SURVEYOR
BARTON CHAPA SURVEYING
5200 State Highway 121
Colleyville, TX 76034
Phone: 817-864-1957
info@bcsdfw.com
TBPLS Firm #10194474
5200 State Highway 121
Colleyville, TX 76034
Phone: 817-488-4960
DRAWN:BCS
CHECKED:JHB
TABLE OF REVISIONS
DATE SUMMARY
JOB NO.2020.001.167
SCALE: 1" = 30'
30'0 15'30'60'
STATE OF TEXAS §
COUNTY OF DENTON §
WHEREAS PENTHOUSE SPEEDWAY CONDO, LLC is the owner of that tract of land out of the R. Bebee Survey, Abstract
Number 29, in the City of Sanger, Denton County, Texas, and being all of Lot 2 of IESI Industrial Park, an addition in the City of
Sanger, Denton County, Texas, according to the plat recorded under Cabinet U, Slide 75, Plat Records, Denton County, Texas,
(P.R.D.C.T.), said Lot 2 being conveyed by deed to Penthouse Speedway Condo, LLC as recorded under Document Number
2020-190468, Official Public Records, Denton County, Texas, (O.P.R.D.C.T.), the subject tract being more particularly described
by metes and bounds as follows (bearings are based on State Plane Coordinate System, Texas North Central Zone (4202)
North American Datum of 1983 (NAD '83)):
BEGINNING at a 1/2 inch rebar with cap stamped, “EAGLE SURVEYING” found for the northwest corner of said Lot 2 and the
herein described tract;
THENCE with the perimeter and to the corners of said Lot 2, the following calls:
1.South 88 degrees 38 minutes 21 seconds East, a distance of 437.83 feet to a 1/2 inch rebar with cap stamped, “EAGLE
SURVEYING” found;
2.South 03 degrees 22 minutes 27 seconds East, a distance of 290.68 feet to a 1/2 inch rebar with cap stamped,
“HAT-2901” found;
3.North 88 degrees 42 minutes 08 seconds West, a distance of 461.51 feet to a 1/2 inch rebar found;
4.North 01 degrees 17 minutes 52 seconds East, a distance of 290.20 feet, returning to the POINT OF BEGINNING and
enclosing 2.993 acres (130,328 square feet) of land, more or less.
STATE OF TEXAS §
COUNTY OF ______________§
NOW, THEREFORE, KNOW ALL MEN BY THESE PRESENTS
THAT, PENTHOUSE SPEEDWAY CONDO, LLC, acting herein by and through its duly authorized officer, does hereby adopt this
plat designating the hereinabove described property as (lot/block/subdivision), an addition to the City of Sanger, Texas, and
does hereby dedicate to the public use forever by fee simple title, free and clear of all liens and encumbrances, all streets,
thoroughfares, alleys, fire lanes, drive aisles, parks, and watercourses, and to the public use forever easements for sidewalks,
storm drainage facilities, utilities and any other property necessary to serve the plat and to implement the requirements of
the subdivision regulations and other City codes and do hereby bind ourselves, our heirs, successors and assigns to warrant
and to forever defend the title on the land so dedicated. Further, the undersigned covenants and agrees that he/she shall
maintain all easements and facilities in a state of good repair and functional condition at all times in accordance with City
codes and regulations. No buildings, fences, trees, shrubs, or other improvements or growths shall be constructed or placed
upon, over, or across the easements as shown, except that landscape improvements may be installed, if approved by the City
of Sanger. The City of Sanger and public utility entities shall have the right to access and maintain all respective easements
without the necessity at any time of procuring permission from anyone.
WITNESS my hand this the ______ day of ____________________ 20___
___________________________________
PENTHOUSE SPEEDWAY CONDO, LLC, Owner (Authorized Agent)
STATE OF TEXAS §
COUNTY OF _______________§
BEFORE ME, the undersigned, a Notary Public in and for the State of Texas, on this day personally
appeared_________________, known to me to be the person whose name is subscribed to the foregoing instrument and
acknowledged to me that he executed the same as for the purpose and consideration therein expressed, and in the capacity
therein stated.
_____________________
Notary Public in and for
the State of Texas
SURVEYOR'S CERTIFICATE
STATE OF TEXAS §
COUNTY OF TARRANT §
I, John H. Barton III, a Registered Professional Land Surveyor of the State of Texas, do hereby certify that the map shown
hereon accurately represents the described property as determined by a survey made on the ground under my direction and
supervision.
Date of Plat/Map: December 15, 2022
_______________________________________________________
John H. Barton III, RPLS# 6737 Date
STATE OF TEXAS §
COUNTY OF TARRANT §
BEFORE ME, the undersigned, a Notary Public in and for the State of Texas, on this day personally appeared
_______________________, known to me to be the person whose name is subscribed to the foregoing instrument and
acknowledged to me that he/she executed the same as for the purpose and consideration therein expressed, and in the
capacity therein stated.
_____________________
Notary Public in and for
the State of Texas
OWNER
PENTHOUSE SPEEDWAY CONDO, LLC
1920 E. S.H. 114
SOUTHLAKE, TX 76092
ENGINEERPLAT NOTES:
1.All lots comply with the minimum size requirements of the zoning district.
2.This property may be subject to charges related to impact fees and the
applicant should contact the City regarding any applicable fees due.
3.All common areas, drainage easements, and detention facilities will be
owned and maintained by the HOA/POA. Any common area within the
City’s right-of-way will require a facilities agreement, to be reviewed and
approved by the City.
4.Notice – selling a portion of this addition by metes and bounds is a
violation of City ordinance and State Law and is subject to fines and
withholding of utilities and building permits.
5.This plat does not alter or remove existing deed restrictions, if any, on
this property.
6.Minimum finished floor elevations are at least 2 feet above the 100 year
flood plain.
7.The purpose of this replat is to dedicate easements within existing Lot 2.
City will need to
verify easement
provided matches
what is needed in the
plans. Previous plans
showed grading
outside the property.
1. Show/label detention pond
easements
2. Show private drainage easement for
all channels .
3. Show any additional DE for roadside
ditches
4. Show Min FFE
Show and label
offsite DE by
separate instrument
for proposed swale.
Determine the 100-yr fully developed
floodplain for ditch along the RR and
verify if it reaches site (ie overflow
across access road, etc)
If it reaches site, provide a floodplain
easement (floodplain +10' buffer)
Verify size, it does
not appear to contain
flow. DE must extend
beyond top of bank
Show appropriate
setbacks.
57
Item 6.
940.458.2059 | 201 Bolivar St. |PO Box 1729 | Sanger, TX 76226 | www.sangertexas.org
facebook.com/SangerTexas @CityofSanger
DATE: 01/30/2023
1st REVIEW COMMENTS – Replat Plat (IESI Industrial Park)
The request is for a Replat of the IESI Industrial Park Lot 2, being approximately 2.993 acres,
prepared by Kirkman Engineering, submitted on 01/18/2023. Below are the comments that should
be addressed before City Council approval. Resubmit the revised plat along with a response letter
addressing all comments.
Planning
Provide the following
1. Provide a signed and notarized copy of private restrictions (if any), that is filed for record
in the office of the County Clerk.
2. Name and addresses of the owner, subdivider, engineer, and surveyor.
3. Change the plat name to Replat.
4. List the complete date of preparation and subsequent revisions.
5. Add note “The subject property does not lie within a 100-year floodplain according to
Community Panel No.___ dated ____, of the National Flood Insurance Rate Maps for
Denton County, Texas.”
6. Add note “Bearings are based on the State Plane Coordinate System, Texas North Central
Zone (4202), North American Datum of 1983 (NAD ’83)”
7. List the name, address, and phone number of utility providers.
8. Include the city signature lines from checklist.
Informational Comments
1. The property is within the City of Sanger.
2. The Final Plat will be scheduled for Planning and Zoning (P&Z) Commission meeting on
Monday, February 13, 2023, and for the City Council meeting on Monday, March 6, 2023.
58
Item 6.
CITY COUNCIL COMMUNICATION
DATE: March 6, 2023
FROM: Ramie Hammonds, Development Service Director
AGENDA ITEM: Consideration and possible action on Ordinance No 03-04-23 amending Chapter
13 Utilities, by adding Article 13.2800 Municipal Setting Designation, Sections
13.2801 Definitions, 13.2802 Use of Groundwater in MSD Areas Prohibited,
13.2803 Application for City Council Approval of MSD, 13.2804 Staff Review,
13.2805 Notice of Public Meeting, 13.2806 Public Meeting, 13.2807 City Council
Public Hearing, 13.2808 Limitation on Reapplication, and 13.2809 Additional
Provisions, Enforcement, and Penalties
SUMMARY:
The City of Sanger’s Code of Ordinance currently does not address Municipal Setting Designations
(MSD’s).
This ordinance will establish a process and guidelines for requesting a MSD.
MSD’s are requested when a property has contamination that would typically require remediation.
Often the remediation is costly and makes developing the property difficult.
In certain cases these properties can apply for a MSD to allow the property to develop or be used
without remediation.
This ordinance gives City Council the ability to approve, conditionally approve, disapprove, or
postpone action on the application.
FISCAL INFORMATION:
Budgeted: N/A Amount: N/A GL Account: N/A
RECOMMENDED MOTION OR ACTION:
Staff recommends APPROVAL.
ATTACHMENTS:
Ordinance No 03-04-23
59
Item 7.
Ordinance – 03-04-23 Amendment to Chapter 13 Municipal Settings Designation
Page 1 of 2
CITY OF SANGER, TEXAS
ORDINANCE 03-04-23
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SANGER, DENTON
COUNTY, TEXAS, REGARDING AMENDING THE CITY OF SANGER CODE OF
ORDINANCE, CHAPTER 13 UTILITIES, ARTICLE 13.2800 MUNICIPAL SETTING
DESIGNATION, SECTIONS 13.2801 DEFINITIONS, 13.2802 USE OF GROUNDWATER
IN MSD AREAS PROHIBITED, 13.2803 APPLICATION FOR CITY COUNCIL
APPROVAL OF MSD, 13.2804 STAFF REVIEW, 13.2805 NOTICE OF PUBLIC
MEETING, 13.2806 PUBLIC MEETING, 13.2807 CITY COUNCIL PUBLIC HEARING,
13.2808 LIMITATION ON REAPPLICATION, AND 13.2809 ADDITIONAL
PROVISIONS, ENFORCEMENT, AND PENALTIES; PROVIDING FOR THE REPEAL
OF ALL ORDINANCES IN CONFLICT; PROVIDING A CUMULATIVE CLAUSE;
PROVIDING FOR A SEVERABILITY CLAUSE; PROVIDING FOR A PENALTY OF
FINE IN ACCORDANCE WITH SECTION 1.109 OF THE CODE OF ORDINANCE FOR
VIOLATIONS; AND PROVIDING A SAVINGS CLAUSE; AUTHORIZING PUBLICATION;
AND ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, the City of Sanger (the “City”) is a home rule municipality regulated by state
law and Charter; and
WHEREAS, the City Council finds it necessary for the public health, safety, and welfare
that development occur in a controlled and orderly manner; and
WHEREAS, all request for amendment to the Code of Ordinance were duly filed with the
City of Sanger, Texas; and
WHEREAS, the following provision of proper legal notice requirements, were made in
the time and manner prescribed by law; and
WHEREAS, the City Council finds that the passage of this Ordinance is in the best interest
of the citizens of Sanger.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
SANGER, TEXAS:
SECTION 1. That an amendment to Chapter 13 Utilities, Article 13.2800 Municipal
Setting Designation, Sections 13.2801 Definitions, 13.2802 Use of Groundwater in MSD Areas
Prohibited, 13.2803 Application for City Council Approval of MSD, 13.2804 Staff Review,
13.2805 Notice of Public Meeting, 13.2806 Public Meeting, 13.2807 City Council Public Hearing,
13.2808 Limitation on Reapplication, and 13.2809 Additional Provisions, Enforcement, and
Penalties as described in Exhibit A is hereby granted.
60
Item 7.
Ordinance – 03-04-23 Amendment to Chapter 13 Municipal Settings Designation
Page 2 of 2
SECTION 2. That all matters stated in the preamble are found to be true and correct and
are incorporated herein as if copied in their entirety.
SECTION 3. It is hereby declared to be the intention of the City Council that the sections,
paragraphs, sentences, clauses, phrases and words of this Ordinance are severable and, if any
word, phrase, clause, sentence, paragraph, or section of this Ordinance shall be declared
unconstitutional by the valid judgment or decree of any court of competent jurisdiction, such
unconstitutionality shall not affect any of the remaining portions of this Ordinance, since the same
would have been enacted by the City Council without the incorporation in this Ordinance of any
such unconstitutional word, phrase, clause, sentence, paragraph, or section.
SECTION 4. Any person, firm or corporation who shall violate any of the provisions of
this article shall be guilty of a misdemeanor and upon conviction shall be fined in accordance
with the general penalty provision found in The Code of Ordinances, Section 1.109 General
Penalty for Violations of Code.
SECTION 5. This ordinance will take effect immediately from and after its passage and
the publication of the caption, as the law and Charter in such cases provide.
PASSED AND APPROVED by the City Council of the City of Sanger, Texas, on this
6th day of March, 2023.
APPROVED:
________________________________
ATTEST: Thomas E. Muir, Mayor
________________________________ APPROVED TO FORM:
Kelly Edwards, City Secretary
________________________________
Hugh Coleman, City Attorney
61
Item 7.
EXHIBIT A
ARTICLE 13.2800 MUNICIPAL SETTING DESIGNATION (MSD)
Sec. 13.2801 Definitions
For the purposes of this article, the following terms, phrases, words, abbreviations, and their
derivations shall have the meaning given herein. When not inconsistent with the context, words
used in the present tense include the future tense, words in the plural number include the singular
number and words in the singular number include the plural number. The word "shall" is always
mandatory and not merely directory. Words not defined shall be given their common and ordinary
meaning.
Affected community. Those persons entitled to notice as defined in section 13-2803(b)(6).
Authorized representative. For purposes of signing an application, if the applicant is a corporation,
the president, secretary, treasurer, or vice-president of the corporation in charge of a principal
business function, or any other person who performs similar policy or decision-making functions
for the corporation; if the applicant is a partnership or sole proprietorship, a general partner or
proprietor, respectively; and if the applicant is a local government, the chief executive officer or
his authorized designee.
Chemical or contaminant of concern. Any chemical that has the potential to adversely affect
ecological or human receptors due to its concentration, distribution, and mode of toxicity.
City attorney. The City Attorney for the City of Sanger or the City Attorney's authorized
representative.
Designated groundwater. Groundwater that will be or is prohibited from use as potable water, or
for all uses, by a municipal setting designation ordinance.
Designated property. The property that will be or is subject to a municipal setting designation
ordinance. The designated property may cover several platted lots or tracts of land.
Director. The Director of Development Services for the City of Sanger, or the Director's authorized
representative.
Environmental risk assessment. The qualitative and quantitative evaluations performed to define
the risk posed to human health and/or the environment by the presence or potential presence and/or
use of pollutants.
Groundwater. Water below the surface of the earth.
Ingestion protective concentration level. The protective concentration level for human ingestions
of contaminants of concern established by the TCEQ under the Texas Risk Reduction Program,
determined as if there was no municipal setting designation.
Ingestion protective concentration level zone. The area where concentrations of contaminants of
concern from sources on or migrating through the designated property are greater than the
62
Item 7.
ingestion protection concentration level, determined as if there was no municipal setting
designation.
Municipal setting designation (MSD). A designation as provided by V.T.C.A. Health and Safety
Code Ch. 361, Subch. W, which authorizes the Executive Director of the Texas Commission on
Environmental Quality to certify municipal setting designations to limit the scope of, or eliminate
the need for, investigations or response actions addressing contaminant impacts to groundwater
that has been restricted from use by ordinance or restrictive covenant.
Municipal setting designation ordinance. An ordinance adopted pursuant to this article.
Noningestion protective concentration level. The protective concentration level for dermal contact
or inhalation of contaminants of concern established by the TCEQ under the Texas Risk Reduction
Program.
Noningestion protective concentration level exceedance zone. The area where concentrations of
contaminants of concern from sources on or migrating from or through the designated property are
greater than noningestion protection concentration levels for contaminants of concern established
by the TCEQ under the Texas Risk Reduction Program.
Potable water. Water used for irrigating crops intended for human consumption, as well as water
used for drinking, showering, bathing, or cooking purposes.
Protective concentration level. The lowest concentration level for a contaminant of concern within
a source medium is determined from all applicable exposure pathways and as defined in the Texas
Risk Reduction Program.
Response action. The control, decontamination, or removal from the environment of a contaminant
or hazardous substance pursuant to V.T.C.A. Health and Safety Code Ch. 361, Subch. W,
"Municipal Setting Designation," of "Solid Waste Disposal Act".
TCEQ. The Texas Commission on Environmental Quality.
TCEQ application. The application submitted to the TCEQ for certification of a municipal setting
designation.
To the extent known. Information known by an applicant or applicant's agent after review of all
public and private records and other information sources available in the exercise of due diligence.
Sec. 13.2802 Use of Groundwater in MSD Areas Prohibited
(a) A person commits an offense if the person intentionally, knowingly, or with criminal
negligence uses groundwater in the designated property as a potable or non-potable water
source.
(b) A person commits an offense if the person intentionally, knowingly, or with criminal
negligence uses groundwater in designated property for any purpose prohibited as a condition
of council approval, as specified in section 13.2807(d).
63
Item 7.
Sec. 13.2803 Application for City Council Approval of MSD
(a) A person seeking city council approval of an MSD for an area within the corporate limits of
the City of Sanger shall apply in writing to the Development Services Department of the City
of Sanger, with the number and format of copies, as determined by the director.
(b) An application shall contain:
(1) The applicant's name and address, and the name, address, daytime telephone number,
and email address of both the applicant's contact person and the licensed professional
who prepared the application;
(2) The location and legal description of the proposed outer boundaries of the MSD area for
which designation is sought;
(3) A statement as to whether a public drinking water supply system exists that satisfies the
requirements of V.T.C.A. Health and Safety Code Ch. 341 and that supplies or is capable
of supplying drinking water to the area for which the MSD is sought, and property within
one-half mile of the area for which the MSD is sought;
(4) A description of the groundwater sought to be restricted, including the identified
chemicals of concern therein and the levels of contamination known to the applicant,
and the identified vertical and horizontal extent of the contamination. If the applicant has
not documented groundwater contamination offsite that originates from the area for
which an MSD is sought, the application shall include a statement as to whether
contamination more likely than not exceeds residential assessment levels offsite and the
basis for that statement;
(5) Identification of the points of origin of the contamination, and identification of the
person(s) responsible for the contamination, to the extent known;
(6) A listing of:
a. All state-registered private water wells within five (5) miles from the boundary of
the area for which the designation is sought, including a notation of those wells that
are used for potable water purposes (if known);
b. Each retail public utility, as that term is defined in the Texas Water Code, that owns
or operates a groundwater supply well located not more than five (5) miles from the
area for which the MSD is sought;
c. Each municipality, other than the City of Sanger, with a boundary located not more
than one-half (½) mile from the area for which the MSD is sought; or that owns or
operates a groundwater supply well located not more than five (5) miles from the
area for which the MSD is sought; and
d. All owners of real property lying within two hundred (200) feet of the subject
property, as the ownership appears on the last approved city tax roll.
(7) A site map, drawn to scale, including a metes and bounds description of the proposed
designated property, the boundary of the proposed MSD area, the location of
groundwater on the proposed MSD area, and the extent of groundwater contamination
to the limits that it has been defined. The map shall include a statement by a professional
64
Item 7.
land surveyor registered by the Texas Board of Professional Surveying attesting to the
accuracy of the metes and bounds description;
(8) The location of all soil sampling points and groundwater monitoring wells;
(9) For each contaminant of concern found at the site, to the extent known, provide a table
displaying the following information:
a. The level of contamination, the ingestion protective concentration level, and
noningestion protective concentration levels, all expressed as mg/L or mg/kg,
depending on the sampling medium; and
b. The critical protective concentration level as defined without the municipal setting
designation, highlighting any exceedances; and
c. The critical protective concentration level as defined with the municipal setting
designation, highlighting any exceedances; and
d. A digital file, in a format acceptable to the Director, that summarizes this
information.
(10) A statement as to whether contamination on and off the designated property will exceed
a residential assessment level as defined in the Texas Risk Reduction Program if known,
and the basis for that statement;
(11) A description of any environmental regulatory actions that have been taken within the
last five (5) years in conjunction with the designated property, to the extent known;
(12) A listing of all existing TCEQ, U.S. Environmental Protection Agency registrations,
permits, and identification numbers that apply to the designated property;
(13) A summary of any environmental site assessment reports filed with the TCEQ regarding
any site investigation or response actions that are planned, ongoing, or completed related
to this designated property;
(14) A statement as to whether the designated property has been submitted to the Texas
Voluntary Cleanup Program (V.T.C.A. Health and Safety Code § 361.601) or similar
state or federal program, and a description of the designated property's status in the
program;
(15) Any other information that the director deems pertinent.
(c) The application shall be signed by an authorized representative of the applicant and shall
contain the following certification statement:
"I certify under penalty of law that this document and all attachments were prepared under
my direction or supervision in a manner designed to assure that qualified personnel properly
gather and evaluate the information submitted. Based on my inquiry of the person or persons
directly responsible for gathering the information, the information submitted is, to the best of
my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment
for knowing violations."
(d) An application shall be accompanied by:
65
Item 7.
(1) An electronic file of the names and addresses of persons listed in subsection (b)(6) above,
in a format acceptable to the director and compatible with city information systems; and
(2) A set of printed mailing labels with the names and addresses of persons listed in
subsection (b)(6) above; and
(3) A nonrefundable application fee in an amount set by the city council; and
(4) It is the sole responsibility of the applicant to ensure that the language of the public
notice, as well as the notification process itself, meets the state requirements.
(e) An applicant may withdraw their application only in writing by letter sent by certified mail,
return receipt requested, to the Director, and shall forfeit the application fee. If the Director
has not issued public notice prior to the receipt of the withdrawal letter, the applicant may
reapply at any time. If public notice has been issued, a new application is subject to the
limitations of section 13-2808 below.
Sec. 13.2804 Staff Review
(a) For purposes of the times stated in this article, an application is deemed to have been received
on the date that the application was actually received by the Director, as indicated by the filing
date on the application by the Development Services department.
(b) The application for an MSD shall be forwarded to the development review committee (DRC)
for staff review. The purpose of the review is to determine whether the application is complete
and whether any current or future city property or other interests have the potential to be
impacted by the proposed MSD. City staff shall not conduct an environmental risk assessment
of the application.
(c) If the Director, in his or her sole discretion, determines that it is likely that a source of a
contaminant of concern originated on the designated property, and that the ingestion or
noningestion protective concentration level exceedance zone for that contaminant of concern
extends to the public right-of-way adjacent to the designated property, the Director may
recommend that the municipal setting designation include a condition that the public right-
of-way adjacent to the property be included, at no additional cost to the city, in the TCEQ
application for the MSD.
(d) If the Director determines that the application is incomplete or insufficient, the application
will be returned to the applicant, noting the deficiencies in writing. The applicant shall have
thirty (30) days from the date of the deficiency letter to correct the deficiencies and resubmit
the application. If the applicant fails to submit a corrected application within the allotted time,
the application shall be deemed to be withdrawn and the application fee forfeited.
(e) If the Director determines that the application is complete, a public meeting and a public
hearing will be scheduled. The public meeting must be held prior to the public hearing.
(1) A public meeting will be scheduled approximately forty-five (45) days following the day
the application was received; and
(2) A public hearing of the city council will be scheduled approximately thirty (30) days
following the public meeting.
66
Item 7.
Sec. 13.2805 Notice of Public Meeting
(a) Notice of the public meeting for an MSD application must include the date, time, and location
of the public meeting, the identity of the applicant, the location and legal description of the
designated property, the purpose of the MSD, the type of contamination identified in the
groundwater of the area for which the MSD is sought, and a statement that a copy of the
application is available for public viewing at the city secretary's office notice will be made as
follows:
(1) The Director will publish notice of a public meeting for a proposed MSD in the official
newspaper of the city, or in a newspaper of general circulation, not less than fifteen (15)
days before the public meeting;
(2) The Director will provide written notice of a public meeting for a proposed MSD, not
less than fifteen (15) days before the date of the public meeting by properly addressed
and regular postage paid, in the United States mail. Notice will be mailed to:
a. The applicant;
b. Those on the list provided by the applicant pursuant to section 13-2803(b)(6);
(b) The applicant is required to post at least one (1) sign-up on the area for which an MSD has
been requested. The sign(s) must state that an MSD has been requested for the area and that
additional information can be acquired by telephoning the number listed thereon or visiting
the website address listed thereon. The erection and/or the continued maintenance of any such
sign shall not be deemed a condition precedent to the holding of any public meeting or public
hearing or any official action concerning the MSD application.
Sec. 13.2806 Public Meeting
(a) The purpose of a public meeting is for the applicant to present information to the affected
community about the MSD process in general, the application specific to the property for
which the MSD is being sought, and to obtain input from the affected community prior to
formal action by the city council.
(b) The applicant or its representative must appear at the public meeting. If the applicant fails to
appear at the public meeting either in person or by a representative, the application shall be
deemed withdrawn and the application fee forfeited.
(c) The Director will facilitate the meeting, allowing the applicant or its representative the
opportunity to present its reasons for requesting an MSD, and allowing members of the
affected community the opportunity to ask the applicant questions or make oral comments on
the application.
Sec. 13.2807 City Council Public Hearing
(a) Prior to the public hearing, the Director will provide the city council a copy of the application,
and a written report summarizing the request for the MSD approval, any staff comments or
concerns, and minutes of the public meeting.
67
Item 7.
(b) The applicant or its representative must appear at the public hearing and present the request
for MSD approval. If the applicant fails to appear at the public hearing, the application shall
be deemed withdrawn and the application fee forfeited.
(c) Persons wishing to speak either in favor of or against the application will be provided the
opportunity by city council guidelines for public hearings.
(d) Following the conclusion of the public hearing, the city council may approve, conditionally
approve, disapprove, or postpone action on the application to a future date. If approving an
application, the city council shall:
(1) Approve a municipal setting designation ordinance supporting the application to be
presented to the TCEQ, and prohibiting the use of designated groundwater from beneath
the designated property; and
(2) Include in the ordinance other reasonable restrictions, including, but not limited to
specification of underground construction materials to be used in the designated
property.
(e) City council approval of an application shall not be deemed to waive the city's right to
comment on an MSD application that has been filed with the executive director of the TCEQ.
Sec. 13.2808 Limitation on Reapplication
If after a public hearing the city council disapproves an application, or if the applicant has
withdrawn its application after public notice has been issued, no new MSD applications for the
proposed designated property shall be accepted by the city or scheduled for a public hearing by
the city council within a period of twelve (12) months of the date of disapproval or withdrawal.
Sec. 13.2809 Additional Provisions, Enforcement, and Penalties
(a) A person who has received approval of an MSD from the city, shall, upon issuance from the
TCEQ, provide the Director with a copy of the certificate of completion or other
documentation issued for the MSD area, showing that response actions, if required, have been
completed.
(b) The applicant shall execute, deliver and file, no later than thirty (30) days from the date of the
TCEQ's certification, in the official real property records of Denton County, Texas, a deed
restriction approved as to form by the City Attorney prohibiting the drilling of wells and the
use of designated groundwater for any purpose, including but not limited to any potable
purpose, and excepting only: (i) wells used as monitoring wells for the collection of
groundwater samples for chemical or biological laboratory analyses; and (ii) wells used for
remediation of soil or groundwater contamination.
(c) A file-stamped and recorded copy of said deed restriction shall be delivered to the city
attorney's office and the Director's office within three (3) business days after the date of filing.
The deed restriction shall be enforceable by the City of Sanger and may be amended or
terminated only with the prior written consent of the City of Sanger after at least thirty (30)
days prior written notice to the TCEQ of any pending amendment or termination.
68
Item 7.
(d) A person commits an offense if they fail to provide the City Attorney and the Director with
the documentation required in this section within the specified time frames.
(e) A person commits an offense if the person intentionally, knowingly, or with criminal
negligence uses groundwater in a designated property for a purpose prohibited in the
municipal setting designation ordinance.
(f) Any person who violates any provision of this article shall, upon conviction, be punished by
a fine not to exceed two thousand dollars ($2,000.00). Each day that one or more provisions
in this article are violated shall be considered a separate offense.
(g) The City Attorney is authorized to commence an action for appropriate legal or equitable
relief in a court of competent jurisdiction in addition to the penalty mentioned in the above
subsection (f). Such additional relief may include a civil fine of up to one thousand dollars
($1,000.00) per day for violations of sections 13-2808, and all other damages, costs, remedies,
and legal processes to which the city may be entitled.
(h) This article shall be and is hereby declared to be cumulative of all other ordinances of the
City of Sanger, and this article shall not operate to repeal or affect any of such other
ordinances except insofar as the provisions thereof might be inconsistent or in conflict with
the provisions of this article, in which event such conflicting provisions, if any, in such other
ordinance or ordinances are hereby repealed.
(i) All of the regulations provided in this article are hereby declared to be governmental and for
the health, safety, and welfare of the general public. Any member of the city council or any
city official or employee charged with the enforcement of this article, acting for the City of
Sanger in the discharge of his/her duties, shall not thereby render himself/herself personally
liable; and he/she is hereby relieved from all personal liability for any damage that might
accrue to persons or property as a result of any act required or permitted in the discharge of
his/her said duties.
69
Item 7.
CITY COUNCIL COMMUNICATION
DATE: March 6, 2023
FROM: Ramie Hammonds, Development Services Director
AGENDA ITEM: Consideration and possible action on the Final Plat of the Mo Addition, being
38.16 acres, located in the City of Sanger’s ETJ, and generally located on the
south side of FM 455 approximately 1961 feet west of the intersection of FM 455
and Creekview Road.
SUMMARY:
The applicant is proposing to create 1 lot from 7 unplatted tracts.
This site is located on the south side of FM 455 approximately 1961 feet west of Creekview Road.
The lot would have access from FM 455.
The lot will be serviced by Bolivar Water Supply Corporation and have on-site sanitary sewer facilities.
The property is located in the City of Sanger’s ETJ.
This plat meets the subdivision ordinance.
The Planning and Zoning Commission recommend APPROVAL on 2-13-23.
FISCAL INFORMATION:
Budgeted: N/A Amount: N/A GL Account: N/A
RECOMMENDED MOTION OR ACTION:
Staff recommends APPROVAL.
ATTACHMENTS:
Location Map
Final Plat
Application
Letter of Intent
70
Item 8.
12 84 35
59 76 2
59 76 1
12 84 19
30 00 31
12 84 17
13 22 485977957678
59 77 2
68 30 81683083
73 98 38
10 60 59
74 119 7 30 00 29
74 41 78
10 60 56
57 37 5
73 15 42
30 00 30
74 41 82
74 52 11
57 20 8
73 16 45
68 30 82
57 20 0
30 00 28
74 12 27
76 63 38
76 63 39
57 37 2
74 52 10
12 84 54
65 07 54
13 22 53
65 07 53
59 74 7
59 74 7
33 91 38
65 07 43
13 22 52
77 38 91
59 74 2
59 75 2
12 84 57
77 38 90
12 84 51HACHTEL DR
CREEKVIEW RD
F M 4 5 5 W
/Project Name: MO AdditionMinor PlatProject: 23SANZO N-0004
0 400 800200 Fe et
DISCLA IMER:This map wa s g en e ra te d by GI S da ta p ro vid edby the S a ng er GIS De pa rtme nt . Th e City o f Sanger do es n ot gu a ra n te e the c orrec tne ss oraccuracy o f a n y fe a tu re s o n th is ma p. Th ese ma pproducts are fo r illust ra tio n pu rpo se s o n ly an dare not suit ab le fo r site -s pe cific d e cision ma king .GIS dat a is su bje ct to co nst an t cha n ge s, an dmay not b e co mple te , a ccu rat e o r cu rren t.Date: 1/22 /2 02 3 4 :11 :10 P MDoc Name : 2 3 SA NZON-0 00 4 _MO A d ditio n Mino r Pla tCity L imi ts Exhi bi ts
SubjectArea
71
Item 8.
SL SL SL SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
FARM
-
T
O
-
M
A
R
K
E
T
R
O
A
D
455
RIGH
T
-
O
F
-
W
A
Y
V
A
R
I
E
S
P. BLACK S
U
R
V
E
Y
,
ABSTRACT
N
O
.
1
0
3
E. HALL SU
R
V
E
Y
,
ABSTRACT
N
O
.
1
5
2
3
APPROXIMATE
LOCATION OF SURVEY
ABSTRACT LINE
(TYPICAL)
CALLED TRACT 1 - 6.49 ACRES
JOHN HARVEY REED, JR.,
TRUSTEE OF THE JOHN HARVEY
REED JR. EXEMPT TRUST
DOC. NO. 2016-50155
O.R.D.C.T.
CALLED TRACT 2 - 23.52 ACRES
JOHN HARVEY REED, JR.,
TRUSTEE OF THE JOHN HARVEY
REED JR. EXEMPT TRUST
DOC. NO. 2016-50155
O.R.D.C.T.
LOT 1R-1
LOTS 1R-2 AND 1R-2,
GRISSOM ESTATES
DOC. NO. 2020-25
P.R.D.C.T.
LOT 1R-2
LOTS 1R-2 AND 1R-2,
GRISSOM ESTATES
DOC. NO. 2020-25
P.R.D.C.T.
TRACT 2
CHOCTAW RIDGE
CAB. F, PG. 6
P.R.D.C.T.
TRACT 3
CHOCTAW RIDGE
CAB. F, PG. 6
P.R.D.C.T.
CALLED 9.922 ACRES
ALLEN ADAM SERRANO
AND KAREN SUE SERRANO
DOC. NO. 1995-19882
O.R.D.C.T.
ZONE "AE"
ZONE "AE"
FLOODWAY
ZONE "AE"
FLOODWAY
ZONE "AE"
FLOODWAY
ZONE "AE"
ZONE "AE"
ZONE "AE"
ZONE "X"
SHADED
ZONE "X"
SHADED
ZONE "X"
SHADED
ZONE "X"
SHADED
ZONE "X"
SHADED
ZONE "X"
UNSHADED
ZONE "X"
UNSHADED
ZONE "X"
UNSHADED
ZONE "X"
UNSHADED
ZONE "AE"
OHU
OH
U
OH
U
OH
U
OH
U
OH
U
OH
U
OH
U
OH
U
OH
U
OH
U
OHU OHU OHU
TBM PK NAIL
N:7181996.6
E:2362979.0
ELEV:653.2'
TBM CIRS
"EAGLE CONTROL"
N:7181046.7
E:2362990.0
ELEV:676.3'
FL-12"CPP=662.1'
FL-12"CPP=662.3'
FL-24"CMP=649.2'
655
65
3
653
65
4
65
4
655
656
657
658
6
5
8
657
65
665
7
6
5
4
65
5
64564664
764
8
64
9
65
0
6
5
1
6
5
2
6
5
3
643
64
4
63
9
64
0
64
1
64
2
63
7
63
8
63
7
635636637634
636
63
6
637
63
6
63
5
6
3
4
63
3
63
4
63
7
6
3
7
6
3
6
63
2
63
3
63
4
63
5
6
3
7
6
3
8
6
3
9
6
4
0
64
1
642
6
4
3
6
4
4
6
4
5
6
4
6
6
4
7
64
8
64
9
65
0
65
165
2
6
5
3
6
5
4
65
5
6
5
6
65
7
6
5
8
65
9
6
6
0
6
6
1
6
6
2
6
6
3
6
6
4
6
6
5
6
6
6
6
6
7
6
6
8
657658659660
662 661
660 659
658
6
5
7
6
5
8
6
5
9
6
5
9
6
5
8
6
5
7
6
5
6
6
5
5
6
5
4
6
5
3
6
5
2
651
6
4
1
6
4
2
6
4
3
6
4
4
6
4
5
6
4
6
6
4
7
6
4
8
6
4
9
6
5
0
6
5
1
6
3
9
6
4
0
63
7
638
63
9
64
0
64
1
64
2
6
4
3
6
4
4
6
4
5
6
4
6
6
4
7
6
4
8
6
4
9
65
0
65
1
65
2
6
5
3
65
4
65
5
65
6
65
76
5
8
6
5
9
6
6
0
6
6
1
6
6
2
6
6
3
6
6
4
6
6
5
6
6
6
6
6
7
6
8
1
68
0
679
67
8
6
7
7
6
7
6
6
7
5
6
7
4
6
7
3
6
7
2
6
7
1
6
7
0
6
6
9
6
6
8
APPROXIMATE FLOOD
ZONE LOCATION AS
SCALED PER FEMA MAP
(TYPICAL)
CALLED 37.93 ACRES
SELVIN DAVID LOPEZ MERIDA AND
VERONICA REMEDIOS OLVERA
DOC. NO. 2018-11604
O.R.D.C.T.
FENCE
POST
FOUND
S 89°04'44" E 1292.38'
S 68°4
0
'
3
6
"
W
1
8
4
.
9
2
'
11
2
.
6
6
'
S
5
9
°
3
9
'
4
8
"
E
1
4
5
.
5
8
'
S
2
2
°
5
4
'
5
0
"
E
S
0
9
°
1
7
'
0
4
"
E
1
9
2
.
8
9
'
N 88°52'09" W 1165.16'
S
0
3
°
0
0
'
3
7
"
E
4
0
1
.
3
3
'
S 3
3
°
4
2
'
3
4
"
W
2
8
2
.
2
9
'
N
0
0
°
3
6
'
2
7
"
E
1
5
3
3
.
9
2
'
L1
L2
L3
S
0
0
°
2
2
'
0
8
"
W
2
9
6
.
4
2
'
C1
POB
CALLED 0.066 ACRES
SELVIN DAVID LOPEZ MERIDA AND
VERONICA REMEDIOS OLVERA
DOC. NO. 2018-43754
O.R.D.C.T.
CALLED 0.13 ACRES
SELVIN DAVID LOPEZ MERIDA AND
VERONICA REMEDIOS OLVERA
DOC. NO. 2022-4118
O.R.D.C.T.
1/2"IRF
N: 7180388.19
E: 2364082.76
48.35'
S 89°14'06" E
CIRS
POINT IN
CREEK
POINT IN
CREEK
POINT IN
CREEK
POINT IN
CREEK
POINT IN
CREEK
POINT IN
CREEK
POINT IN
CREEK
POINT IN
CREEK
POINT IN
CREEK
CIRS
CIRS 30' BUILDING LINE SETBACK
BY THIS PLAT
16' UTILITY EASEMENT
BY THIS PLAT
LOT 1
38.16 ACRES - GROSS
1,662,343 SQ.FT. - GROSS
23.67 ACRES - NET
1,031,292 SQ. FT. - NET
LESS ZONE "AE" AND ZONE "AE" FLOODWAY
CL
CL
CL
CL
C L
C L
GRATE INLET
TOP= 653.6'
4
0
.
0
'
1/2"IRF "KAZ"
N: 7181945.02
E: 2362934.09
NAD'83
4
0
.
0
'
CALLED 15.789 ACRES
ROVERT HUGHEY AND
AMBER DEANE HUGHEY
DOC. NO. 2018-89070
O.R.D.C.T.
54.18
'
LOT 2
GRISSOM ESTATES
DOC. NO. 2010-84
P.R.D.C.T.
DRAINAGE EASEMENT
BY THIS PLAT
DRAINAGE EASEMENT
BY THIS PLAT
8.3'x10.3'
STONE/STUCCO
WELLHOUSE
8.3'x10.3'
STONE/STUCCO
WELLHOUSE
N
= PLAT BOUNDARY
PAGE 1 OF 2FINAL PLAT
MO ADDITION
LOT 1, BLOCK A
1 LOT / 38.16 ACRES
BEING ALL OF A CALLED 37.93 ACRE TRACT, 0.13 ACRE TRACT & 0.066
ACRE TRACT RECORDED IN DOC. NO. 2018-11604, 2022-4118 & 2018-43754,
OFFICIAL RECORDS, DENTON COUNTY, TEXAS,
IN THE P. BLACK SURVEY, ABSTRACT No. 103,
E. HALL SURVEY, ABSTRACT No. 1523
IN THE ETJ OF THE CITY OF SANGER, DENTON COUNTY, TEXAS
DATE OF PREPARATION: 1/17/2023
Drafter
Project
Date
EN
02/23/2023
2005.033-03 EAGLE SURVEYING, LLC
222 S. Elm Street, Suite: 200
Denton, TX 76201
(940) 222-3009
TX Firm #10194177
SURVEYOR
Eagle Surveying, LLC
Contact: Brad Eubanks
222 S. Elm Street, Suite: 200
Denton, TX 76201
(940) 222-3009
= CAPPED IRON ROD SETCIRS
= CAPPED IRON ROD FOUNDCIRF
PLAT RECORDS,P.R.D.C.T.
= CABINETCAB
= PAGEPG
DENTON COUNTY, TEXAS=
OFFICIAL RECORDS,O.R.D.C.T.DENTON COUNTY, TEXAS=
LEGEND
= POINT OF BEGINNINGPOB
= IRON ROD FOUNDIRF
OWNER
Selvin David Lopez Merida &
Veronica Remedios Olvera
2512 Craig Lane
Denton, TX 76209
(940) 458-1993
DOCUMENT NUMBERDOC. NO. =
VICINITY MAP
(NOT TO SCALE)
= ADJOINER BOUNDARY
SITE
LOCATION
35
KE
A
T
O
N
455
5TH
DUCK CREEK
WILLOW
5
T
H
ELM
DUCK CREEK
DUCK CREEK
SU
L
L
I
V
A
N
CHAPMAN RD
CR
E
E
K
V
I
E
W
ENGINEER
Development Engineering Consultants, LLC
Contact: Shawn Rockenbaugh
5300 Town & Country Boulevard, Suite 150
Frisco, TX 75034
(469) 850-0060
1" = 100'
0 10050
SL = SURVEY LINE
LINE TABLE
LINE BEARING DISTANCE
L1 S 10°00'36" W 67.91'
L2 S 26°11'02" W 85.53'
L3 S 65°16'50" W 74.78'
CURVE TABLE
CURVE ARC LENGTH RADIUS DELTA ANGLE CHORD BEARING CHORD LENGTH
C1 54.19'2914.79'1°03'54"N 68°12'54" E 54.18'1.The purpose of this plat is to create one (1) lot of record from three unplatted
tracts of land.
2.This property is located in Zone "AE", Zone "AE" Floodway, Zone "X" Shaded,
& Zone "X" Unshaded, as scaled from the F.E.M.A. Flood Insurance rate Map
dated April 18, 2011 and is located in Community Number 480074 as shown on
Map Number 48121C0205G. The location of the Flood Zone is approximate.
For additional information regarding Flood Zone designation, please contact
1-(877) FEMA MAP.
3.The grid coordinates shown on this plat are based on GPS observations
utilizing the AllTerra RTKNET Cooperative network. NAD 83(2011) State Plane
Coordinate System (Texas North Central Zone - 4202).
4.Notice: Selling a portion of this addition by metes and bounds is a violation of
City Ordinance and State Law, and is subject to fines and withholding of utilities
and building permits.
5.All interior property corners are marked with a 1/2-inch iron rod with a green
plastic cap stamped "EAGLE SURVEYING" unless noted otherwise.
6.The bearings shown on this plat are based on GPS observations utilizing the
AllTerra RTKNET Cooperative network. NAD 83(2011) Datum.
7.All lots comply with the minimum size requirements of the zoning district.
8.This property may be subject to charges related to impact fees and the
applicant should contact the City regarding any applicable fees due.
9.All common areas, drainage easements, and detention facilities will be owned
and maintained by teh HOA/POA. Any common area with in the City's
right-of-way will require a facilities agreement, to be reviewed and approved by
the City.
10.This plat does not alter or remove existing deed restrictions, if any, on this
property.
11.Minimum finished floor elevations are at least 2 feet above the 100 year
floodplain.
12.Sanitary sewer to be handled by facilities approved by the Denton County
Public Health Department.
13.All surface drainage easements shall be kept clear of fences, buildings,
foundations, plantings, and other obstructions to the operation and
maintenance of the drainage easement.
14.The maintenance of paving, grading and drainage improvements and/or
easements shown on this plat are the responsibility of the individual property
owners and do not constitute acceptance of same for maintenance purposes by
Denton County.
15.Construction not complete within two years of the Commissioners Court
approval shall be subject to current County Subdivision Rules and Regulations.
16.A driveway culvert must be obtained from Development Services by the owner
of each lot prior to the construction, installation or placements of any driveway
access improvements within the dedicated right-of-way.
17.No construction, without written approval from Denton County shall be allowed
within an identified "FIRM" floodplain area, and then only after a detailed
floodplain development permit including engineering plans and studies show
that no rise in Base Flood Elevation (BFE) will result, that no flooding will result,
that no obstruction to the natural flow of water will result; and subject to all
owners of the property affected by such construction becoming a part to the
request. Where construction is permitted, all finished flood elevations shall be a
minimum of two-foot above the 100-year flood elevation.
18.Blocking the flow of water or construction improvements in surface drainage
easements, and filling or obstruction the floodway is prohibited.
19.Denton County will not be responsible for any damage, personal injury or loss
of life or property occasioned by flooding or flooding conditions.
20.The existing creeks or drainage channels traversing along or across the
addition will remain as open channels and will be maintained by the individual
property owners of the lot or lots that are traversed by or adjacent to the
drainage courses along or across the lots.
21.Denton County shall not be responsible for maintenance of private streets,
drives, emergency access easements, recreation areas and open spaces; and
the owners shall be responsible for the maintenance of private streets, drives,
emergency access easements, recreation areas and open spaces, and said
owners agree to indemnify and hold harmless Denton County, from all claims,
damages and losses arising our of the resulting from performance of the
obligations of said owners set forth in this paragraph.
22.Elevations shown on this survey are based on GPS observations utilizing the
AllTerra RTK Network. North American Vertical Datum of 1988 (Geoid 12B).
23.This area is serviced by Bolivar Water Supply Corporation, 4151 FM 455 West,
Sanger, TX. (940) 458-3931.
24.Water is currently provided by well
25.Electric service provided by Coserve Electric, 1701 Lakeview Blvd., Denton, TX
(940) 383-1671.
GENERAL NOTES
= TEMPORARY BENCHMARKTBM
72
Item 8.
PAGE 2 OF 2FINAL PLAT
MO ADDITION
LOT 1, BLOCK A
1 LOT / 38.16 ACRES
BEING ALL OF A CALLED 37.93 ACRE TRACT, 0.13 ACRE TRACT & 0.066
ACRE TRACT RECORDED IN DOC. NO. 2018-11604, 2022-4118 & 2018-43754,
OFFICIAL RECORDS, DENTON COUNTY, TEXAS,
IN THE P. BLACK SURVEY, ABSTRACT No. 103,
E.HALL SURVEY, ABSTRACT No. 1523
IN THE ETJ OF THE CITY OF SANGER, DENTON COUNTY, TEXAS
DATE OF PREPARATION: 1/17/2023
OWNER'S CERTIFICATE & DEDICATION
STATE OF TEXAS §
COUNTY OF DENTON §
WHEREAS, SELVIN DAVID LOPEZ MERIDA and VERONICA REMEDIOS OLVERA are the sole owners of a 38.16 acre tract of land out of the P. BLACK SURVEY, ABSTRACT NUMBER
103 and the E. HALL SURVEY, ABSTRACT NUMBER 1523, situated in the Extraterritorial Jurisdiction of the City of Sanger, Denton County, Texas, and being all of a called 37.93 acre tract
of land conveyed to Selvin David Lopez Merida and Veronica Remedios Olvera by Special Warranty Deed with Vendor's Lien of record in Document Number 2018-11604 of the Official
Records of Denton County, Texas, being all of a called 0.13 acre tract of land conveyed to Selvin David Lopez Merida and Veronica Remedios Olvera by Warranty Deed of record in
Document Number 2022-4118 of the Official Records of Denton County, Texas, being all of a called 0.066 acre tract of land conveyed to Selvin David Lopez Merida and Veronica Remedios
Olvera by Special Warranty Deed of record in Document Number 2018-43754 of the Official Records of Denton County, Texas, and being more particularly described as follows:
BEGINNING, at a 1/2" iron rod with orange plastic cap stamped "KAZ" found in the south right-of-way line of Farm-to-Market Road 455 (variable width right-of-way), being the northeast
corner of a called 9.922 acre tract of land conveyed to Allen Adam Serrano and Karen Sue Serrano by Warranty Deed of record in Document Number 1995-19882 of the Official Records of
Denton County, Texas, being the northwest corner of said 37.93 acre tract, being the beginning of a non-tangent curve to the left;
THENCE, In a northeasterly direction, along said non-tangent curve to the left, along the south right-of-way line of Farm-to-Market Road 455, being the common north lines of said 37.93
acre tract, said 0.13 acre tract and said 0.066 acre tract, having a radius of 2914.79 feet, a chord bearing of N68°12'54"E, a chord length of 54.18 feet, a delta angle of 01°03'54", an arc
length of 54.19 feet to 1/2" iron rod with green plastic cap stamped "EAGLE SURVEYING" set at the northwest corner of a called 15.789 acre tract of land conveyed to Robert Hughey and
Amber Hughey by Warranty Deed with Vendor's Lien of record in Document Number 2018-89070 of the Official Records of Denton County, Texas, and the northeast corner of said 0.13 acre
tract;
THENCE, S00°22'08"W, along the west line of said 15.789 acre tract, being the common east line of said 0.13 acre tract, a distance of 296.42 feet to a 1/2" iron rod with green plastic cap
stamped "EAGLE SURVEYING" set in the north line of said 37.93 acre tract, being the southwest corner of said 15.789 acre tract, and the southeast corner of said 0.13 acre tract;
THENCE, S89°04'44"E, along the south line of said 15.789 acre tract, being the common north line of said 37.93 acre tract, a distance of 1292.38 feet to a 1/2" iron rod with green plastic
cap stamped "EAGLE SURVEYING" set at the southeast corner of said 15.789 acre tract, being the southwest corner of Tract 3, Choctaw Ridge, an addition to the City of Sanger, according
to the plat recorded in Cabinet F, Page 6 of the Plat Records of Denton County, Texas;
THENCE, S89°14'06"E, along the south line of said Tract 3, being the common north line of said 37.93 acre tract, a distance of 48.35 feet to a point in a creek;
THENCE, meandering along a creek, being the west lines of said Replat of Grissom Estates and Lot 2, Grissom Estates, an addition to the City of Sanger, according to the plat recorded in
Document Number 2010-84 of the Plat Records of Denton County, Texas, being the common east line of said 37.93 acre tract, the following bearings and distances:
1.S68°40'36"W, a distance of 184.92 feet to a point in a creek;
2.S10°00'36"W, a distance of 67.91 feet to a point in a creek;
3.S59°39'48"E, a distance of 112.66 feet to a point in a creek;
4.S22°54'50"E, a distance of 145.58 feet to a point in a creek;
5.S09°17'04"E, a distance of 192.89 feet to a point in a creek;
6.S26°11'02"W, a distance of 85.53 feet to a point in a creek;
7.S65°16'50"W, a distance of 74.78 feet to a point in a creek;
8.THENCE, S03°00'37"E, a distance of 401.33 feet to a point in a creek at the southwest corner of said Lot 2 and the north corner of a called 23.52 acre tract of land described as
Tract 2 conveyed John Harvey Reed, Jr. by General Warranty Deed of record in Document Number 2016-50155 of the Official Records of Denton County, Texas;
THENCE, S33°42'34"W, along the west line of said Tract 2, being the common east line of said 37.93 acre tract, a distance of 282.29 feet to a 1/2" iron rod found at a northerly corner of said
Tract 2 and the southeast corner of said 37.93 acre tract ;
THENCE, N88°52'09"W, along the north line of said Tract 2 and a called 6.49 acre tract of land described as Tract 1 conveyed to John Harvey Reed, Jr. by General Warranty Deed of record
in Document Number 2016-50155 of the Official Records of Denton County, Texas, being the common south line of said 39.73 acre tract, a distance of 1165.16 feet to a fence post found in
the east line of said 9.922 acre tract, at the northwest corner of said Tract 1 and the southwest corner of said 39.73 acre tract;
THENCE, N00°36'27"E, along the east line of said 9.922 acre tract, being the common west line of said 39.73 acre tract, a distance of 1533.92 feet to the POINT OF BEGINNING,
containing 38.16 acres or 1,662,343 square feet, more or less.
NOW THEREFORE KNOW ALL MEN BY THESE PRESENTS:
THAT SELVIN DAVID LOPEZ MERIDA and VERONICA REMEDIOS OLVERA, acting herein by and through its duly authorized officer does hereby adopt this plat designating the
hereinabove described property as MO ADDITION an addition to the City of Sanger, Texas, and does hereby dedicate to the public use forever by fee simple title, free and clear of all liens
and encumbrances, all streets, thoroughfares, alleys, fire lanes, drive aisles, parks, and watercourses, and to the public use forever easements for sidewalks, storm drainage facilities,
utilities, and any other property necessary to serve the plat and to implement the requirements of the subdivision regulations and other City codes and do hereby bind ourselves, our heirs,
successors and assigns to warrant and to forever defend the title on the land so dedicated. Further, the undersigned covenants and agrees that he/she shall maintain all easements and
facilities in a state of good repair and functional condition at all times in accordance with City codes and regulations. No buildings, fences, trees, shrubs, or other improvements or growths
shall be constructed or placed upon, over, or across the easements as shown, except that landscape improvements may be installed, if approved by the City of Sanger. The City of Sanger
and public entities shall have the right to access and maintain all respective easements without the necessity at any time of procuring permission from anyone.
WITNESS MY HAND THIS _____ DAY OF __________, 2023.
OWNERS: SELVIN DAVID LOPEZ MERIDA and VERONICA REMEDIOS OLVERA
BY:____________________________________________________
SELVIN DAVID LOPEZ MERIDA Date
STATE OF TEXAS §
COUNTY OF DENTON §
BEFORE ME, the undersigned authority, on this day personally appeared SELVIN DAVID LOPEZ MERIDA, known to me to be the person whose name is subscribed to the foregoing
instrument, and acknowledged to me that he executed the same for the purposes and considerations therein expressed and in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF THE OFFICE this _______ day of __________________, 2023.
_______________________________________
Notary Public in and for the State of Texas
BY:____________________________________________________
VERONICA REMEDIOS OLVERA Date
STATE OF TEXAS §
COUNTY OF DENTON §
BEFORE ME, the undersigned authority, on this day personally appeared VERONICA REMEDIOS OLVERA, known to me to be the person whose name is subscribed to the foregoing
instrument, and acknowledged to me that he executed the same for the purposes and considerations therein expressed and in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF THE OFFICE this _______ day of __________________, 2023.
_______________________________________
Notary Public in and for the State of Texas
Drafter
Project
Date
EN
02/23/2023
2005.033-03 EAGLE SURVEYING, LLC
222 S. Elm Street, Suite: 200
Denton, TX 76201
(940) 222-3009
TX Firm #10194177
PRELIMINARY
this document shall not be recorded for any
purpose and shall not be used or viewed or
relied upon as a final survey document
CERTIFICATE OF SURVEYOR
STATE OF TEXAS §
COUNTY OF DENTON §
I, MATTHEW RAABE, Registered Professional Land Surveyor, do hereby certify that this plat
was prepared from an actual survey made on the ground and that the monuments shown hereon
were found or placed with 1/2-inch iron rods with green plastic caps stamped "EAGLE
SURVEYING" under my direction and supervision in accordance with the current provisions of the
Texas Administrative Code and the Ordinances of the City of Sanger, Denton County, Texas.
_____________________________________________________
Matthew Raabe, R.P.L.S. # 6402 Date
STATE OF TEXAS §
COUNTY OF DENTON §
BEFORE ME, the undersigned authority, on this day personally appeared MATTHEW RAABE,
known to me to be the person whose name is subscribed to the foregoing instrument, and
acknowledged to me that he executed the same for the purposes and considerations therein
expressed and in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF THE OFFICE this ____ day of ______________,
2023.
___________________________________________
Notary Public in and for the State of Texas
PRELIMINARY PLAT FOR REVIEW PURPOSES ONLY
Approved for Preparation of a Final Plat
______________________________________ ___________________________
Chairman, Planning & Zoning Commission Date
City of Sanger, TX
______________________________________ ___________________________
Mayor, Date
City of Sanger, TX
______________________________________ ___________________________
City Secretary Date
City of Sanger, TX
SURVEYOR
Eagle Surveying, LLC
Contact: Brad Eubanks
222 S. Elm Street, Suite: 200
Denton, TX 76201
(940) 222-3009
OWNER
Selvin David Lopez Merida &
Veronica Remedios Olvera
2512 Craig Lane
Denton, TX 76209
(940) 458-1993
ENGINEER
Development Engineering Consultants, LLC
Contact: Shawn Rockenbaugh
5300 Town & Country Boulevard, Suite 150
Frisco, TX 75034
(469) 850-0060
FINAL PLAT
73
Item 8.
1-18-2023
1-18-2023
74
Item 8.
DEC · 5300 Town & Country Boulevard, Suite 150 · Frisco, Texas 75034 · 469-850-0060
January 18, 2023
City of Sanger
Development Services
201 Bolivar Street
Sanger, TX, 76266
Re: Letter of Intent
Mo Addition Lot 1, Block A
Sanger ETJ
DEC 10363.
Dear: City of Sanger Development Services
As required by the City of Sanger Subdivision Application requirements, this letter is to serve as
a Letter of Intent to plat the subject tract as one lot. The subject property is a 38.16-acre tract of
land out of the P. Plack Survey, Abstract Number 103 and the E. Hall Survey, Abstract Number
1532, situated in the Extraterritorial Jurisdiction of the City of Sanger. The subject tract being all
of a Special Warranty deeds Document Number 2018-11604 and 2022-4118 of the Official
Records of Denton County, Texas.
The owner of the properties being Selvin David Lopez Merida and Veronica Remedios Olvera,
wish to subdivide the property into three lots. The owner address being 9826 Angel Bend, Denton,
TX 76208.
The point of contact for the application and platting process will be Shawn Rockenbaugh. Point
of contact address is 5300 Town & Country Boulevard #150, Frisco TX 75034. Phone 469-850-
0060 and email shawn@dec-en.com.
The intent to the application is to plat the current property into one lot through the Minor Plat
process. The purpose of subdivision is to allow possibility of future development of the property.
The property lies off of and has access FM 455 west of the City of Sanger and lies within the City
of Sanger extraterritorial jurisdiction. The current property contains a single-family residence.
The applicant an Owner request that the City of Sanger Planning Staff, and required approval
bodies review and act upon the Minor plat application for Mo Addition, Lot 1, Block A. We request
that the previous plat submittal showing three lots be pulled from consideration.
Sincerely,
Shawn Rockenbaugh
Sr. Project Manager
Development Engineering Consultants, LLC
75
Item 8.
CITY COUNCIL COMMUNICATION
DATE: March 6, 2023
FROM: Shani Bradshaw, Director of Economic Development
AGENDA ITEM: Consideration and possible action on the Purchase and Sales Agreement for Lot
2R and 3R, Block A, Sanger Industrial Addition, Lots 1R, 2R & 3R, a Subdivision
in Denton, County, Texas.
SUMMARY:
4A Industrial Development Corporation will consider this agreement at their board meeting on Tuesday,
February 28, 2023.
FISCAL INFORMATION:
Budgeted: NA Amount: $1,500,000.00 GL Account: NA
RECOMMENDED MOTION OR ACTION:
Recommend Approval.
ATTACHMENTS:
Purchase and Sales Agreement for Warehouse
Commitment for Title
Warehouse Survey
76
Item 9.
PURCHASE AND SALE AGREEMENT
between
Sanger Texas Industrial Development Corporation
and
City of Sanger
dated as of
March 6, 2023
77
Item 9.
2
PURCHASE AND SALE AGREEMENT
This PURCHASE AND SALE AGREEMENT (this "Agreement"), dated as of March 6, 2023 (the
"Effective Date"), is entered into between the Sanger Texas Industrial Development Corporation , a
Texas non-profit corporation ("Seller") having an address at 201 Bolivar Street, Sanger, Tx 76266 and
the City of Sanger, a Texas Home Rule Municipal Corporation ("Purchaser") having an address at 502
Elm Street, P.O. Box 1729, Sanger, Texas 76266.
RECITALS
WHEREAS, Seller is the owner of the Property (as hereinafter defined); and
WHEREAS, subject to the terms and conditions hereof, Seller desires to sell to Purchaser the
Property and Purchaser desires to purchase the Property from Seller.
NOW, THEREFORE, in consideration of the mutual covenants and agreements hereinafter set forth
and for other good and valuable consideration, the receipt and sufficiency of which are hereby
acknowledged, the parties hereto agree as follows:
ARTICLE I
DEFINITIONS
The following terms have the meanings specified or referred to in this ARTICLE I:
"Agreement" has the meaning set forth in the preamble.
"Closing" has the meaning set forth in Section 4.01(a).
"Closing Date" has the meaning set forth in Section 4.01(a).
"Confidential Information" has the meaning set forth in Section 12.01.
"Deposit" has the meaning set forth in Section 3.01(a).
"Escrow Agent" has the meaning set forth in Section 3.01(a).
"Improvements" has the meaning set forth in the Section 2.01(b).
"Land" has the meaning set forth in Section 2.01(a).
"Leases" has the meaning set forth in Section 2.01(e).
"Notices" has the meaning set forth in Section 9.01.
"OFAC" has the meaning set forth in Section 6.01(f).
"Permitted Exceptions" has the meaning set forth in Section 5.02.
78
Item 9.
3
"Property" has the meaning set forth in Section 2.01.
"Purchase Price" has the meaning set forth in Section 3.01.
"Purchaser" has the meaning set forth in the preamble.
"Purchaser Default" has the meaning set forth in Section 10.01(a).
"Purchaser Related Party" shall mean collectively any Purchaser agent, advisor, representative,
affiliate, employee, director, partner, member, beneficiary, investor, servant, shareholder, trustee, or
other person or entity acting on Purchaser's behalf or otherwise related to or affiliated with Purchaser.
"Purchaser's Survey" has the meaning set forth in Section 5.03(a)(ii).
""Seller" has the meaning set forth in the preamble.
"Seller Related Party" shall mean collectively any Seller agent, advisor, representative, affiliate,
employee, director, partner, member, beneficiary, investor, servant, shareholder, trustee, or other person
or entity acting on Seller's behalf or otherwise related to or affiliated with Seller.
"Seller's Survey" has the meaning set forth in Section 5.02(c).
"Title Commitment" has the meaning set forth in Section 5.03(a)(i).
"Title Insurance Company" has the meaning set forth in Section 5.01.
"Title Objection Date" has the meaning set forth in Section 5.03(b).
"Title Objection Notice" has the meaning set forth in Section 5.03(b).
"Transaction Parties" has the meaning set forth in Section 12.01.
"Violations" has the meaning set forth in Section 5.05.
"Voluntary Liens" has the meaning set forth in Section 5.04(d).
ARTICLE II
CONVEYANCE OF THE PROPERTY
Section 2.01 Subject of Conveyance. Seller agrees to sell and convey to Purchaser and
Purchaser agrees to purchase from Seller, upon the terms and conditions hereinafter set forth, all right,
title, and interest of Seller in and to the following (collectively referred to herein as the "Property"):
(a) All that certain lot, piece, or parcel of land located at Lot 2R and 3R, Block A,
SANGER INDUSTRIAL ADDITION, LOTS 1R, 2R & 3R, Sanger, County of Denton and State
of Texas, as more particularly bounded and described in Exhibit A attached hereto and hereby
made a part hereof (the "Land");
79
Item 9.
4
(b) All buildings and improvements located on the Land and all of Seller's right, title,
and interest in and to any and all fixtures attached thereto (collectively, the "Improvements");
(c) All equipment, machinery, apparatus, appliances, and other articles of personal
property located on and used in connection with the operation of the Improvements (collectively,
the "Personal Property"), to the extent any of same are owned by Seller;
(d) All rights appurtenant to the Land, if any, including without limitation, any strips
and gores abutting the Land, and any land lying in the bed of any street, road, or avenue in front
of, or adjoining the Land, to the center line thereof;
(e) All other rights, privileges, easements, licenses, appurtenances, and hereditaments
relating to the Property.
Notwithstanding anything herein to the contrary, "Property" does not include any tenant fixtures
or other property belonging to the tenants at the Property, or any item leased from third-parties.
Section 2.02 AS-IS.
(a) Subject to Section 5.03 of this Agreement, Purchaser acknowledges that
Purchaser has made thorough inspections and investigations of the Property and Purchaser agrees
to take title to the Property "AS-IS, WHERE IS, AND WITH ALL FAULTS" and in the
condition existing as of the date of this Agreement, subject to reasonable use, ordinary wear and
tear, and without any reduction in or abatement of the Purchase Price. Purchaser has undertaken
all such investigations of the Property as Purchaser deems necessary or appropriate under the
circumstances as to the status of the Property and the existence or non-existence of curative
action to be taken with respect to any hazardous or toxic substances on or discharged from the
property, and based upon same, Purchaser is and will be relying strictly and solely upon such
inspections and examinations and the advice and counsel of its own consultants, agents, legal
counsel, and officers.
(b) Neither party to this Agreement is relying on any statement or representation not
expressly stated in this Agreement. Purchaser specifically confirms and acknowledges that in
entering into this Agreement, Purchaser has not been induced by, and has not relied upon,
whether express or implied, warranties, guaranties, promises, statements, inducements,
representations, or information pertaining to the Property or its uses, the physical condition,
environmental condition, state of title, income, expenses, or operation of the Property, or any
other matter or thing with respect thereto, written or unwritten, whether made by Seller or any
agent, employee, or other representative of Seller, or any broker or any other person representing
(or purporting to represent) Seller, which are not expressly set forth in this Agreement. Seller
shall not be liable for or bound by any written or unwritten statements, representations,
warranties, brokers' statements, or other information pertaining to the Property furnished by
Seller, any broker, any agent, employee, or other actual (or purported) representative of Seller, or
any person, unless and only to the extent the same are expressly set forth in this Agreement.
(c) Seller makes no warranty with respect to the presence of any hazardous or toxic
substances on, above, beneath, or discharged from the Property (or any adjoining or neighboring
property) or in any water on or under the Property. The Closing hereunder shall be deemed to
80
Item 9.
5
constitute an express waiver of Purchaser's right to recover from Seller, and upon the Closing,
Purchaser forever releases, covenants not to sue, and discharges Seller from, any and all
damages, demands, claims, losses, liabilities, penalties, fines, liens, judgments, costs, or
expenses whatsoever, including attorneys' fees and costs, whether direct or indirect, known or
unknown, foreseen or unforeseen, that may arise on account of or in any way be connected with
the physical condition of the Property.
(d) The provisions of this Section 2.02 shall survive the Closing and shall not be
deemed to have merged into any of the documents executed or delivered at the Closing.
ARTICLE III
PURCHASE PRICE
Section 3.01 Purchase Price and Deposit. The purchase price to be paid by Purchaser to
Seller for the Property is One Million Five Hundred Thousand and No/100 Dollars ($1,500,000) (the
"Purchase Price"). The Purchase Price shall be payable as follows:
(a) Simultaneously with the execution and delivery of this Agreement by Purchaser,
the sum of Ten and No/100 Dollars ($10) and additional, independent consideration in the
amount of Ten and No/100 Dollars ($10) together with any interest earned thereon, (collectively,
the "Deposit") by Purchaser's wire transfer of immediately available federal funds to Michelle
Neely as escrow agent ("Escrow Agent"), to an account at such bank as designated by Escrow
Agent. The receipt of the Deposit is hereby acknowledged and Escrow Agent agrees to hold the
Deposit in escrow pursuant to the terms of ARTICLE XI of this Agreement. Any interest earned
on the principal portion of the Deposit shall be deemed to be part of the Deposit and shall be paid
together with the principal portion of the Deposit, it being understood and agreed that if the
transaction contemplated under this Agreement closes, any interest earned on the Deposit shall
not be credited to the Purchase Price upon the Closing and shall, upon the Closing, be and
remain the property of Seller.
(b) The balance of the Purchase Price in the amount of One Million Four Hundred
and Ninety-Nine Thousand Nine Hundred and Ninety and No/100 Dollars ($1,499,990) shall be
paid to Seller on the Closing Date, subject to any credits or apportionments as provided for under
this Agreement, simultaneously with delivery of the deed, by one or more wire transfers of
immediately available federal funds to an account, or accounts, designated in writing by Escrow
Agent no later than thirty (30) days prior to the Closing Date.
Section 3.02 No Financing. Purchaser expressly agrees and acknowledges that Purchaser's
obligations to pay the Purchase Price and otherwise consummate the transactions contemplated hereby
are not in any way conditioned upon Purchaser's ability to obtain financing of any type or nature
whatsoever (i.e., whether by way of debt financing, equity investment, or otherwise).
81
Item 9.
6
ARTICLE IV
CLOSING
Section 4.01 Closing Date.
(a) The closing of the transaction contemplated by this Agreement (the "Closing")
shall take place on March 31, 2023 or on such later date as provided under Section 4.01(b) of this
Agreement (the "Closing Date") through an escrow closing with Title Insurance Company.
Purchaser acknowledges and agrees that TIME SHALL BE OF THE ESSENCE with respect
to the performance by Purchaser of its obligations to purchase the Property, pay the Purchase
Price, and otherwise consummate the transactions contemplated in this Agreement on the
Closing Date.]
(b) Pursuant to Section 5.04(a) of this Agreement, Seller shall have the right to
adjourn the Closing Date.
Section 4.02 Seller's Closing Deliverables. At the Closing, Seller shall deliver or cause to be
delivered to Purchaser, the following executed, certified, and acknowledged by Seller, as appropriate:
(a) A special warranty deed, executed with the appropriate acknowledgement form
and otherwise in proper form for recording so as to convey title to the Property as required by
this Agreement. The delivery of the special warranty deed by Seller, and the acceptance by
Purchaser, shall be deemed the full performance and discharge of every obligation on the part of
Seller to be performed pursuant to this Agreement, except those obligations of Seller that are
expressly stated in this Agreement to survive the Closing.
(b) A bill of sale whereby Seller conveys to Purchaser all of Seller's right, title, and
interest in and to the Personal Property, equipment, and other tangible property included in this
sale, together with all state and local sales tax returns, and payment of all sales taxes payable in
connection with such conveyance of Personal Property. The bill of sale will be delivered without
any Seller representations or warranties.
(c) In connection with the Leases, Seller shall deliver to Purchaser:
(i) Originals of all Leases, if in Seller's possession, or copies certified by
Seller as being true, correct, and complete;
(ii) An updated and current rent roll certified by Seller as being true, correct,
and complete along with a list of any tenants who are delinquent in their payment of rent
and the amount of rent that remains outstanding, if any, dated no more than fifteen (15)
days prior to Closing;
(iii) An updated and current schedule of all security deposits under the Leases
along with a check, or credit to Purchaser, in the amount of any cash security deposits,
including any interest thereon payable to Purchaser, held by Seller pursuant to the Leases
on the Closing Date; and if any security deposit is in the form of a letter of credit, Seller
shall coordinate for the transfer of any such letter of credit to Purchaser on the Closing
Date;
82
Item 9.
7
(iv) An executed counterpart to an assignment and assumption agreement
relating to the Leases and specifically providing: (A) Seller's assignment of the Leases
and Purchaser's assumption of the Leases; (B) no representations and warranties from
Seller relating to the Leases other than as expressly set forth in this Agreement; (C)
Seller's agreement to indemnify, defend, and hold harmless Purchaser from and against
all claims, actions, proceedings, losses and liabilities, and expenses arising from Seller's
failure to perform its obligations under the Leases as landlord and accruing prior to the
Closing Date; and (D) Purchaser's agreement to indemnify, defend, and hold harmless
Seller from and against all claims, actions, proceedings, losses and liabilities, and
expenses arising from Purchaser's failure to perform its obligations under the Leases as
landlord accruing from and after the Closing Date; and
(v) Originally executed tenant notice letters to each of the tenants under the
Leases advising them of the sale of the Property to Purchaser, the transfer of the tenants'
security deposits to Purchaser (where applicable) and directing the tenants to thereafter
deliver all notices to Purchaser and pay all rents or other payments directly to Purchaser,
or its agent, as provided in the notice letter.
(d) A certification that Seller is not a "foreign person" as such term is defined in
Section 1445 of the Internal Revenue Code, as amended and the regulations thereunder, which
certification shall be signed under penalty of perjury.
(e) Originals, or copies certified by Seller as being complete, of all applicable bills,
invoices, and other items that shall be apportioned as of the Closing Date.
(f) A consent of the board of directors of Seller authorizing the transaction
contemplated hereby and the execution and delivery of the documents required to be executed
and delivered hereunder.
(g) Seller's original closing statement and any disclosure forms required under federal
and/or state law.
(h) All keys and access codes to any portion of the Property, to the extent in Seller's
possession or control.
(i) All other documents reasonably necessary or otherwise required by Escrow Agent
and Title Insurance Company to consummate the transaction contemplated by this Agreement.
Section 4.03 Purchaser's Closing Deliverables. At the Closing, Purchaser shall deliver or
cause to be delivered to Seller, the following, executed, certified, and acknowledged by Purchaser, as
appropriate:
(a) The balance of the Purchase Price as set forth in Section 3.01(b).
(b) An acknowledgment receipt of the copies (or originals) of the Leases delivered by
Seller.
83
Item 9.
8
(c) An acknowledgment receipt for the security deposits under the Leases and interest
thereon assigned to Purchaser. Said receipt shall contain Purchaser's agreement to indemnify and
hold Seller harmless from and against all liability, claim, loss, damage, or expense, including
reasonable attorneys' fees, incurred in connection with, or arising or asserted with respect to, said
security deposits and interest.
(d) One (1) original Notice to Tenant executed by Purchaser to each of the tenants
under the Leases.
(e) Purchaser's original closing statement and any disclosure forms required under
federal and/or state law.
(f) Purchaser shall, where applicable, join with Seller in the execution and delivery of
the closing documents and instruments required under Section 4.02 of this Agreement.
(g) A consent of the City Council of Purchaser authorizing the transaction
contemplated hereby and the execution and delivery of the documents required to be executed
and delivered hereunder.
(h) All other documents reasonably necessary or otherwise required by Escrow Agent
and Title Insurance Company to consummate the transaction contemplated by this Agreement.
Section 4.04 Closing Costs.
(a) Seller and Purchaser shall each pay the fees and expenses of its own counsel in
connection with the preparation and negotiation of this Agreement. The deed and other
agreements and instruments related to the transaction contemplated by this Agreement and such
legal costs shall not be part of the closing costs; provided, however, that if any legal action is
instituted under this Agreement, the prevailing party in such action shall be entitled to recover
from the other party costs related to such legal action, including reasonable attorneys' fees and
costs in all trial, appellate, post-judgment, and bankruptcy proceedings.
(b) Seller shall pay:
(i) The commission owed to the Broker, if any, pursuant to ARTICLE XIII of
this Agreement;
(ii) All recording fees for the release of any liens on the Property, as required
pursuant to the terms of this Agreement; and
(iii) The title insurance premium charged by Title Insurance Company for
Purchaser's owner's title insurance policy.
(c) Purchaser shall pay:
(i) Title Insurance Company charges for title endorsements to Purchase's
owner's policy as well as the premium for a loan policy required by Purchaser's lender, if
any;
84
Item 9.
9
(ii) The costs related to the Purchaser's Survey and any other survey or survey
update;
(iii) Any other fees or costs related to Purchaser's due diligence reviews;
(iv) Any transfer fees charged by the issuer of any letters of credit; and
(v) All costs related to the recording fees payable in connection with the
recording of the deed and Purchaser's lender's security instruments, if any.
Section 4.05 Apportionments. The following shall be apportioned as of 11:59 p.m. Central
Time of the date immediately preceding the Closing Date, unless expressly provided for otherwise:
(a) Seller shall pay for any and all real estate taxes due and payable before the
Closing. Purchaser shall pay for any and all real estate taxes due and payable on or after the
Closing. No real estate tax credit or proration shall be given to Purchaser by Seller. If the
Property shall be, or has been, affected by any assessments or special assessments payable in a
lump sum or which are, or may become, payable in installments, of which the first installment is
then a charge or lien, or has already been paid, then at the Closing such amounts will be paid or
apportioned, as the case may be, in the following manner:
(i) Any such assessments or installments, or portion thereof, payable on or
after the Closing Date shall be the responsibility of Purchaser; and
(ii) Any such assessments or installments, or portion thereof, payable prior to
the Closing Date shall be the responsibility of Seller.
The obligations contained in this Section 4.05(a) shall survive the Closing and shall not
be merged into the Deed.
(b) All water and sewer charges based on the fiscal year for which they are assessed,
unless the meters are read on the date immediately preceding the Closing Date; provided,
however, that if any such charges or rents are payable by any tenant under the Leases, such
charges or rents shall not be apportioned.
(c) Utilities, fuel, gas, and electric charges based on most recently issued bills, unless:
(i) the meters are read on the date immediately preceding the Closing Date; or (ii) the Purchaser
has opened its own accounts as of the Closing Date; provided, however, that if any such charges
are payable by any tenant under the Leases, such charges shall not be apportioned.
(d) Any leasing commissions due to any broker or leasing agent on or after the date
hereof in connection with any Leases.
(e) All other items customarily apportioned in connection with sales of buildings
substantially similar to the Property in the State of Texas.
Section 4.06 Miscellaneous. Any miscellaneous adjustments payable by either Purchaser or
Seller, as the case may be, that occur at the Closing may be paid at the Closing by delivery of personal
or business checks; provided, however, that such miscellaneous adjustments do not exceed ($500.00).
85
Item 9.
10
Any errors in calculations or apportionments shall be corrected or adjusted as soon as practicable after
the Closing Date. The provisions of this Section 4.06 and Section 4.05 shall survive the Closing Date.
ARTICLE V
TITLE MATTERS AND VIOLATIONS
Section 5.01 Acceptable Title. Seller shall convey, and Purchaser shall accept, such title to the
Property that any title insurance company authorized and licensed to do business in Texas (the "Title
Insurance Company") would be willing to insure, subject to the matters set forth in this Agreement.
Seller shall convey, and Purchaser shall accept, fee simple title to the Property in accordance with the
terms and conditions of this Agreement, and subject to:
(a) The Permitted Exceptions; and
(b) Such other matters as any Title Insurance Company shall be willing to omit as
exceptions to coverage or to except with insurance against collection out of or enforcement
against the Property.
Section 5.02 Permitted Exceptions. The Property shall be sold, assigned, and conveyed by
Seller to Purchaser, and Purchaser shall accept and assume same, subject to the following matters
(collectively, the "Permitted Exceptions"):
(a) Any and all present and future zoning, building, environmental and other laws,
statutes, ordinances, codes, rules, regulations, requirements, or executive mandates of all
governmental authorities having jurisdiction with respect to the Property, including, without
limitation, landmark designations and all zoning variances and special exceptions, if any;
provided, however, that the same are not violated by the Improvements or prohibit or impair the
continued use of the Property as it is being used on the date of this Agreement.
(b) Possible encroachments and/or projections of stoop areas, roof cornices, window
trims, vent pipes, cellar doors, steps, columns and column bases, flue pipes, signs, piers, lintels,
window sills, fire escapes, satellite dishes, protective netting, sidewalk sheds, ledges, fences,
coping walls (including retaining walls and yard walls), air conditioners, and the like, if any, on,
under or above any street or highway, the Property or any adjoining property, provided, however,
that the same do not impact the value of the Property or impair the continued use of the Property
as it is being used on the date of this Agreement.
(c) The state of facts shown on that certain survey made by Landmark Surveyors,
LLC dated January 24, 2023 ("Seller's Survey") and any additional state of facts a new or
updated survey or personal inspection would show, provided the additional facts do not render
title uninsurable in Texas.
(d) Rights of tenants of the Property pursuant to the Leases and any and all
amendments, assignments, subleases, with Seller, or any predecessor fee owner of the Property
or other statutory tenants, and others claiming by, through, and under such tenants.
86
Item 9.
11
(e) All presently existing and future liens for unpaid real estate taxes, assessments,
and water and sewer charges that are not due and payable as of the Closing Date, subject to any
apportionments as provided for in this Agreement.
(f) All covenants, restrictions and rights of record, and all easements and agreements
of record for the erection and/or maintenance of water, gas, steam, electric, telephone, sewer or
other utility pipelines, poles, wires, conduits, or other like facilities, and appurtenances thereto,
over, across, and under the Property; provided, however, that the same are not violated by the
Improvements and do not impose any monetary obligation on the owner of the Property.
(g) Party walls and party wall rights, beams and beam rights, the possible revocable
nature of or lack of right to maintain vaults or other improvements or installations beyond
building or property lines.
(h) Variations between tax lot lines and lines of record title provided same do not
render title uninsurable in Texas.
(i) Any lien or encumbrance (including, without limitation, any mechanics lien and
materialmen's lien) the removal of which is the obligation of a tenant.
(j) Any lien or encumbrance arising out of the acts or omissions of Purchaser.
(k) Consents by Seller or any former owner for the erection and maintenance of any
structures on, under, or above any streets or roads on which the Property may abut, provided
same do not render title unmarketable.
(l) Any financing statements filed on a date more than five (5) years prior to the
Closing Date and not renewed, and any financing statements, chattel mortgages, encumbrances,
or mechanics' or other liens filed against the against property or equipment which is not part of
the Property or is owned by tenants.
(m) Any exceptions disclosed on Schedule B of the Title Commitment (as hereinafter
defined) which will be extinguished upon the transfer of the Property.
(n) Any exceptions disclosed on Schedule B of the Title Commitment which are the
responsibility of any tenant under the Leases to cure, correct, and remove of record.
(o) The standard conditions and exceptions to title contained in the form of title
policy or a revised post "mark-up" Title Commitment issued to Purchaser by Title Insurance
Company.
(p) Such other matters as any reputable title insurer licensed to do business in Texas
shall be willing, without special premium, to omit as exceptions to title insurance coverage.
(q) The matters set forth on Exhibit D attached to this Agreement.
Section 5.03 Title.
87
Item 9.
12
(a) Purchaser shall promptly order, at its sole cost and expense:
(i) A commitment for title insurance from the Title Insurance Company,
together with true, legible copies (to the extent available) of all instruments giving rise to
any defects or exceptions to title to the Property (collectively, the "Title Commitment"),
which Title Commitment shall be delivered both Purchaser and Seller concurrently; and
(ii) Either an update of Seller's Survey or a new survey of the Property,
prepared by a surveyor licensed in Texas ("Purchaser's Survey"), which Purchaser's
Survey shall be delivered to counsel for both Purchaser and Seller concurrently.
(b) Purchaser shall deliver to Seller in writing, any objections to the exceptions to
title set forth in the Title Commitment or Purchaser's Survey, other than the Permitted
Exceptions (collectively, "Title Objection Notice"), by no later than 12:00 pm Central Time on
the date that is fifteen (15) days after the Effective Date ("Title Objection Date"). The failure by
Purchaser, or Purchaser's attorney, to deliver the Title Objection Notice on or before the Title
Objection Date shall constitute Purchaser's irrevocable acceptance of the Title Commitment and
Purchaser's Survey and Purchaser shall be deemed to have unconditionally waived any right to
object to any matters set forth therein. If, after giving the Title Objection Notice to Seller and
Seller's attorney, Purchaser receives any amendment or update to the Title Commitment or to
Purchaser's Survey showing any title defects which Purchaser claims are not Permitted
Exceptions, Purchaser shall give written notice thereof to Seller immediately after the date
Purchaser receives such evidence and Purchaser shall be deemed to have unconditionally waived
any such matters of which it fails to give such notice to Seller within fifteen (15) days after the
date Purchaser receives same. Purchaser acknowledges and agrees that TIME IS OF THE
ESSENCE with respect to all time periods relating to Purchaser's obligations set forth in this
Section 5.03.
Section 5.04 Seller's Inability to Convey.
(a) If, on the Closing Date, Seller fails or is unable to convey title to the Property in
accordance with this Agreement, Seller shall be entitled, upon written notice delivered to
Purchaser on or prior to the Closing Date, to reasonable adjournments of the Closing one or more
times for a period not to exceed thirty (30) days in the aggregate to enable Seller to convey such
title to the Property.
(b) If Seller does not so elect to adjourn the Closing, and on the Closing Date, fails or
is unable to convey title subject to and in accordance with the provisions of this Agreement,
Purchaser shall be entitled, to either: (i) terminate this Agreement by written notice to Seller and
Escrow Agent delivered on or before the Closing Date, in which event Purchaser shall be entitled
to a return of the Deposit minus the independent consideration, and this Agreement shall
thereupon be deemed terminated and of no further effect, and neither party hereto shall have any
obligations to the other hereunder or by reason hereof, except for the provisions hereof that
expressly survive termination of this Agreement; or (ii) complete the purchase (with no reduction
in the Purchase Price) with such title as Seller is able to convey on the Closing Date.
88
Item 9.
13
(c) If Seller elects to adjourn the Closing as provided in Section 5.04(a) above, this
Agreement shall remain in effect for the period or periods of adjournment, in accordance with its
terms. If, on the adjourned Closing Date, Seller fails or is unable to convey title to the Property
subject to and in accordance with the provisions of this Agreement, Purchaser shall make its
election between clauses (i) and (ii) of Section 5.04(b) above, by written notice to Seller given
not later than the adjourned Closing Date. If Purchaser shall fail to give such notice as aforesaid,
Purchaser shall be deemed to have elected clause (ii) above and the Closing shall take place on
the adjourned Closing Date.
(d) Notwithstanding anything to the contrary contained in this Agreement, Seller
shall not be required to take or bring any action or proceeding or any other steps to remove any
defect in or objection to title or to fulfill any condition precedent to Purchaser's obligations under
this Agreement or to expend any moneys therefor, nor shall Purchaser have any right of action
against Seller therefor, at law or in equity, except that Seller shall, on or prior to the Closing,
pay, discharge, or remove of record or cause any Voluntary Lien to be paid, discharged, or
removed of record at Seller's sole cost and expense. The term "Voluntary Liens" as used herein
shall mean any lien and other encumbrances (other than Permitted Exceptions) which: (i) Seller
has knowingly and intentionally placed (or allowed to be placed) on the Property, including,
without limitation, mortgages and mechanics' liens; (ii) are in a liquidated amount; and (iii) may
be satisfied solely by the payment of money. For all Voluntary Liens, other than mortgages and
mechanics liens, Seller shall have no obligation to pay, discharge, or remove of record Voluntary
Liens, in the aggregate, in an amount greater than No/100 Dollars ($100.00).
(e) Notwithstanding anything in this Section 5.04 above to the contrary, Purchaser
may at any time accept such title as Seller can convey, without reduction of the Purchase Price or
any credit or allowance on account thereof or any claim against Seller. The acceptance of the
Deed by Purchaser shall be deemed to be full performance of, and discharge of, every agreement
and obligation on Seller's part to be performed under this Agreement, except for such matters
which are expressly stated to survive the Closing hereunder.
Section 5.05 Violations. Notwithstanding anything to the contrary in this Agreement,
Purchaser shall accept title to the Property subject to any and all violations or any notes or notices of
violations of law or municipal ordinances, orders, or requirements noted or issued prior to, on, or after
the date of this Agreement (collectively, the "Violations"), if any. Purchaser acknowledges and accepts
that Seller shall not be obligated to comply with, or take any action or incur any expense in connection
with any Violations. If requested by Purchaser, Seller shall furnish Purchaser with an authorization to
make any required violation searches against the Property.
ARTICLE VI
REPRESENTATIONS AND WARRANTIES
Section 6.01 Seller's Representations and Warranties. Seller represents and warrants to
Purchaser on and as of the date of this Agreement and on and as of the Closing Date as set forth in this
Section 6.01:
(a) Seller is a non-profit corporation duly organized, validly existing and in good
standing under the laws of the State of Texas.
89
Item 9.
14
(b) The execution, delivery, and performance of this Agreement by Seller and all
agreements, instruments, and documents herein provided to be executed by Seller on the Closing
Date: (i) do not violate the Articles of Incorporation of Seller, or any contract, agreement,
commitment, lease, order, judgment, or decree to which Seller is a party; and (ii) have been duly
authorized by the resolutions of the board of directors of Seller and the appropriate and necessary
action has been taken by such board of directors on the part of Seller. This Agreement is valid
and binding upon Seller, subject to bankruptcy, reorganization, and other similar laws affecting
the enforcement of creditors' rights generally.
(c) Seller is not a "foreign person" as such term is defined in Section 1445 of the
Internal Revenue Code or any regulations promulgated thereunder, as amended.
(d) To Seller's actual knowledge, there is no pending or threatened litigation or
condemnation action against the Property or against Seller with respect to the Property as of the
date of this Agreement.
(e) Seller has not entered into any service or equipment leasing contracts relating to
the Property.
(f) Seller is not, and will not become, a person or entity with whom United States
persons or entities are restricted or prohibited from doing business under regulations of the
Office of Foreign Asset Control ("OFAC") of the Department of the Treasury (including those
named on OFAC's specially designated and blocked persons list) or under any statute, executive
order (including the September 24, 2001, Executive Order Blocking Property and Prohibiting
Transactions With Persons Who Commit, Threaten to Commit, or Support Terrorism), or other
governmental action and is not and will not engage in any dealings or transactions or be
otherwise associated with such persons or entities.
Section 6.02 Purchaser's Representations and Warranties. Purchaser represents and
warrants to Seller on and as of the date of this Agreement and on and as of the Closing Date as set forth
in this Section 6.02:
(a) Purchaser is a Home Rule Municipal Corporation duly organized, validly existing,
and in good standing under the laws of the State of Texas.
(b) The execution, delivery, and performance of this Agreement by Purchaser and all
agreements, instruments, and documents herein provided to be executed by Purchaser on the
Closing Date: (i) do not violate the Charter of Purchaser, or any contract, agreement,
commitment, lease, order, judgment, or decree to which Purchaser is a party; and (ii) have been
duly authorized by the resolutions of the City Council of Purchaser and the appropriate and
necessary action has been taken by the Mayor on the part of Purchaser. This Agreement is valid
and binding upon Purchaser, subject to bankruptcy, reorganization, and other similar laws
affecting the enforcement of creditors' rights generally.
(c) Purchaser has not violated any contract, agreement, or other instrument to which
Purchaser is a party nor any judicial order, judgment, or decree to which Purchaser is bound by:
(i) entering into this Agreement; (ii) executing any of the documents Purchaser is obligated to
execute and deliver on the Closing Date; or (iii) performing any of its duties or obligations under
90
Item 9.
15
this Agreement or otherwise necessary to consummate the transactions contemplated by this
Agreement.
(d) There are no actions, lawsuits, litigation, or proceedings pending or threatened in
any court or before any governmental or regulatory agency that affect Purchaser's power or
authority to enter into or perform this Agreement. There are no judgments, orders, or decrees of
any kind against Purchaser unpaid or unsatisfied of record, or, to the best of Purchaser's
knowledge, threatened against Purchaser, which would have any material adverse effect on the
business or assets or the condition, financial or otherwise, of Purchaser or the ability of
Purchaser to consummate the transactions contemplated by this Agreement.
(e) Except for the express representations and warranties of Seller found in Section
6.01, Purchaser is acquiring the Property on an "AS IS, WHERE IS" basis, without any
representation or warranty of any kind or nature whatsoever, express or implied, and Purchaser
acknowledges that no such representations or warranties have been made except as set forth in
writing herein. In deciding whether to acquire the Property, Purchaser is relying solely on
Purchaser's investigation of the Property.
(f) Purchaser is not, and will not become, a person or entity with whom United States
persons or entities are restricted or prohibited from doing business under regulations of OFAC
(including those named on OFAC's specially designated and blocked persons list) or under any
statute, executive order (including the September 24, 2001, Executive Order Blocking Property
and Prohibiting Transactions With Persons Who Commit, Threaten to Commit, or Support
Terrorism), or other governmental action and is not and will not engage in any dealings or
transactions or be otherwise associated with such persons or entities.
ARTICLE VII
LEASES; MAINTENANCE AND REPAIRS
Section 7.01 Leases.
(a) Notwithstanding anything to the contrary in this Agreement, until the Closing or
earlier termination of this Agreement, Seller shall not, without Purchaser's prior written consent
(which consent shall not be unreasonably withheld, conditioned, or delayed), extend or renew
any Lease (except as may be required by law or by the provisions of any Lease) or enter into any
new lease encumbering any part of the Property which may become vacant after the date of this
Agreement. The surrender or termination of any Lease or the removal of any tenant or occupant
(by summary proceedings or otherwise) prior to the Closing Date shall not entitle Purchaser to a
reduction in, or credit or allowance against, the Purchase Price or give rise to any other claim on
the part of Purchaser or affect the obligations of Purchaser under this Agreement. Prior to the
Closing Date, Seller shall have the right, but shall have no obligation, to enforce the rights and
remedies of the landlord under any Lease by summary proceedings or otherwise, and if Seller
shall have commenced a summary proceeding against a tenant under any Lease or if a tenant
shall have abandoned or vacated its premises, Seller may apply all or any portion of any security
deposit then held by Seller under any such Lease with respect to such tenant toward any loss or
damage incurred by Seller by reason of any default by such tenant.
91
Item 9.
16
(b) If applicable Purchaser shall assume the obligations to pay such commissions
when earned and all other obligations of Seller under the Brokerage Agreements accruing after
the Closing Date which are in existence on the date of this Agreement and provide for a
brokerage commission to be payable on a date after the Closing Date for a new lease,
modification, extension, or renewal of an existing Lease effective on the Closing Date; provided,
however, that Seller shall pay to Purchaser, or provide a credit thereto, at the Closing for Seller's
pro-rata share of such amounts based on Seller's period of ownership during the term for which
any such brokerage commissions are payable. Purchaser agrees to hold harmless Seller against
all claims, demands, liabilities, and obligations (including, without limitation, reasonable
attorneys' fees and disbursements) arising under any such Brokerage Agreements after the
Closing Date. Seller agrees to hold harmless Purchaser against all claims, demands, liabilities,
and obligations (including, without limitation, reasonable attorneys' fees and disbursements)
arising under any Brokerage Agreements payable prior to the Closing Date, and, if applicable,
such commissions that are payable after the Closing Date but which are for a period of time prior
to the Closing Date and that are to be apportioned pursuant to this Section 7.01(b).
(c) Seller shall not enter into any new agreements with any brokers in connection
with any prospective tenants for new leases from the date of this Agreement through the Closing
Date, or earlier termination of this Agreement, without Purchaser's consent and Purchaser shall
assume at the Closing all obligations under such agreements. There shall be no apportionment
between Seller and Purchaser of any commission payments arising under such agreements and
originating from prospective tenants who after the Closing Date become tenants of the Property.
(d) Purchaser shall defend and indemnify Seller against, and hold Seller harmless
from, all claims, demands, liabilities, losses, damages, costs, and expenses, including reasonable
attorneys' fees, asserted by third parties for any breach, default, or violation of any Lease, or
covenant thereof, occurring after the Closing Date.
Section 7.02 Maintenance and Repairs. Seller shall cause the Property, and the
Improvements, to be maintained in substantially the same manner as prior to the date of this Agreement
pursuant to Seller's normal course of business, subject to reasonable wear and ARTICLE VIII of this
Agreement.
ARTICLE VIII
RISK OF LOSS
Section 8.01 Risk of Loss. If prior to the Closing Date any portion of the Property shall be
taken by condemnation or eminent domain or damaged or destroyed by fire or other casualty, neither
party shall have the right to cancel this Agreement. Purchaser shall purchase the Property in accordance
with this Agreement, and the Purchase Price shall not be reduced; provided, however, that Seller's rights
to any award resulting from such taking or any insurance proceeds resulting from such fire or other
casualty (less any reasonable sums expended by Seller for repair or restoration through the Closing
Date) shall be assigned by Seller to Purchaser at the Closing. Purchaser and Seller hereby irrevocably
waive the provision of any statute that provides for a different outcome or treatment in the event the
Property shall be taken or damaged or destroyed by fire of other casualty, including without limitation,
the provisions of the Uniform Vendor and Purchaser Risk Act (Tex. Prop. Code Ann. § 5.007).
92
Item 9.
17
ARTICLE IX
NOTICES
Section 9.01 Delivery of Notices. Unless specifically stated otherwise in this Agreement, all
notices, demands, requests, consents, approvals, or other communications (for purposes of this Section
9.01 collectively referred to as "Notices") shall be in writing and delivered to Purchaser, Seller, or
Escrow Agent, at the addresses set forth in Section 9.02 below, by one the following methods:
(a) Personal delivery, whereby delivery is deemed to have occurred at the time of
delivery;
(b) Overnight delivery by a nationally recognized overnight courier company,
whereby delivery is deemed to have occurred the business day following deposit with the
courier;
(c) Registered or certified mail, postage prepaid, return receipt requested, whereby
delivery is deemed to have occurred on the third business day following deposit with the United
States Postal Service; or
(d) Electronic transmission (facsimile or electronic mail) provided that such
transmission is completed no later than 5:00 p.m. Central Time on a business day and the
original is also sent by personal delivery, overnight delivery, or by mail in the manner previously
described, whereby delivery is deemed to have occurred at the end of the business day on which
the electronic transmission is complete.
Section 9.02 Parties' Addresses.
(a) Unless changed in accordance with Section 9.02(b) of this Agreement, the
addresses for all communications and notices shall be as follows:
If to Seller:
Name: Sanger Texas Industrial Development Corporation
Address: 201 Bolivar Street, Sanger, Texas 76266
Attention: Chairman 4a Board
If to Purchaser:
Name: City of Sanger
Address: 502 Elm Street, P.O. Box 1729, Sanger, Texas 76266
Attention: City Manager
With a copy to:
Name: City of Sanger
Address: 502 Elm Street, P.O. Box 1729, Sanger, Texas 76266
Attention: City Attorney
93
Item 9.
18
If to Escrow Agent:
Name: Doma Title
Address: 525 S. Locust St, Suite 400, Denton, Texas 76266
Attention: Michelle Neely
Email: michelle.neely.v@doma.com
(b) Any party may, by notice given in accordance with this Article, designate a
different address or person for receipt of all communications or notices.
(c) Any notice under this Agreement may be given by the agents of the respective
parties who are hereby authorized to do so on their behalf.
ARTICLE X
REMEDIES
Section 10.01 Remedies.
(a) If Purchaser shall default in the observance or performance of Purchaser's
obligations under this Agreement and the Closing does not occur as a result thereof (a
"Purchaser Default"), Seller's sole and exclusive remedy shall be to retain the Deposit plus any
accrued interest thereon, if any, as and for full and complete liquidated and agreed damages for
Purchaser's Default, and the parties shall be released from further liability to each other
hereunder, except for those obligations and liabilities that are expressly stated to survive
termination of this Agreement. SELLER AND PURCHASER AGREE THAT IT WOULD BE
IMPRACTICAL AND EXTREMELY DIFFICULT TO ESTIMATE THE DAMAGES WHICH
SELLER MAY SUFFER UPON A PURCHASER DEFAULT AND THAT THE DOWN
PAYMENT AND ANY INTEREST EARNED THEREON, AS THE CASE MAY BE,
REPRESENTS A REASONABLE ESTIMATE OF THE TOTAL NET DETRIMENT THAT
SELLER WOULD SUFFER UPON A PURCHASER DEFAULT. SUCH LIQUIDATED AND
AGREED DAMAGES ARE NOT INTENDED AS A FORFEITURE OR A PENALTY
WITHIN THE MEANING OF APPLICABLE LAW.
(b) If Seller shall default in the observance or performance of any of the terms of this
Agreement, and Purchaser is ready, willing, and able to close in accordance with the terms,
provisions, and conditions of this Agreement and the Closing does not occur as a result thereof,
Purchaser's sole and exclusive remedy shall be to receive the Deposit and any accrued interest
thereon minus the independent consideration, if any. Notwithstanding anything to the contrary
contained in this Agreement, in no event shall Seller be liable to Purchaser for any damages of
any kind whatsoever. Purchaser waives all rights to specific performance or injunctive relief or
other relief to cause Seller to perform its obligations under this Agreement.
(c) Upon the release of the Deposit, and any interest accrued thereon, to either
Purchaser or Seller, as the case may be, this Agreement shall be deemed null and void and no
party hereto shall have any obligations to, or rights against, the other hereunder, except as
expressly provided herein.
94
Item 9.
19
(d) The provisions of this Article shall survive the Closing or termination of this
Agreement.
ARTICLE XI
ESCROW
Section 11.01 Escrow Terms. Escrow Agent shall hold and disburse the Deposit in accordance
with the following provisions:
(a) Escrow Agent shall have the right, but not the obligation, to invest the Deposit in
savings accounts, treasury bills, certificates of deposit, and/or in other money market instruments
approved by Seller, or in funds investing in any of the foregoing, and shall not be liable for any
losses suffered in connection with any such investment.
(b) If the Closing occurs, then Escrow Agent shall deliver the Deposit to Seller.
(c) If for any reason the Closing does not occur and either party makes a written
demand upon Escrow Agent for payment of the Deposit, Escrow Agent shall give written notice
to the other party of such demand. If Escrow Agent does not receive a written objection from the
other party to the proposed payment within fifteen (15) days after the giving of such notice,
Escrow Agent is hereby authorized to make such payment. If Escrow Agent does receive such
written objection within such fifteen (15) day period or if for any other reason Escrow Agent in
good faith shall elect not to make such payment, Escrow Agent shall continue to hold such
amount until otherwise directed by written instructions from the parties to this Agreement or a
final judgment in court. However, Escrow Agent shall have the right at any time to deposit the
escrowed proceeds and interest thereon, if any, with the clerk of a court having competent
jurisdiction in the county in which the Property is located. Escrow Agent shall give written
notice of such deposit to Seller and Purchaser. Upon such deposit, Escrow Agent shall be
relieved and discharged of all further obligations and responsibilities hereunder.
Section 11.02 Escrow Agent's Duties and Responsibilities.
(a) Escrow Agent has signed this Agreement for the sole purpose of agreeing to act as
Escrow Agent in accordance with this Article. Escrow Agent shall have no duties or
responsibilities except those set forth in this Agreement and Seller and Purchaser agree and
acknowledge that Escrow Agent shall act hereunder as a depository only.
(b) Escrow Agent shall be protected in relying upon the accuracy, acting in reliance
upon the contents, and assuming the genuineness of any notice, demand, certificate, signature,
instrument, or other document that is given to Escrow Agent without verifying the truth or
accuracy of any such notice, demand, certificate, signature, instrument, or other document.
(c) The parties acknowledge that Escrow Agent is acting solely as a stakeholder at
their request and for their convenience, that the duties of Escrow Agent hereunder are purely
ministerial in nature and shall be expressly limited to the safekeeping and disposition of the
Deposit in accordance with the provisions of this Agreement. Escrow Agent shall not be liable
for any action taken or omitted by Escrow Agent in good faith and believed by Escrow Agent to
95
Item 9.
20
be authorized or within its rights or powers conferred upon it by this Agreement, except for any
damage caused by Escrow Agent's own gross negligence or willful default or misconduct.
Escrow Agent shall not have any liability or obligation for loss of all or any portion of the
Deposit by reason of the insolvency or failure of the institution or depository with whom the
escrow account is maintained. Upon the disbursement of the Deposit in accordance with this
Agreement, Escrow Agent shall be relieved and released from any liability under this
Agreement, except in connection with Escrow Agent's gross negligence or willful default or
misconduct.
(d) In the event that a dispute shall arise in connection with this Agreement, or as to
the rights of the parties in and to, or the disposition of, the Deposit, Escrow Agent shall have the
right to: (i) hold and retain all or any part of the Deposit until such dispute is settled or finally
determined by litigation, arbitration, or otherwise; (ii) deposit the Deposit in an appropriate court
of law, following which Escrow Agent shall thereby and thereafter be relieved and released from
any liability or obligation under this Agreement; (iii) institute an action in interpleader or other
similar action permitted by stakeholders in Texas; or (iv) interplead any of the parties in any
action or proceeding which may be brought to determine the rights of the parties to all or any
part of the Deposit.
(e) Escrow Agent shall not charge a fee for its services as the escrow agent in the
transaction contemplated by this Agreement.
(f) All costs and expenses incurred by Escrow Agent in performing its duties as
Escrow Agent including, without limitation, reasonable attorneys' fees (whether paid to retained
attorneys or amounts representing the fair value of legal services rendered to or for itself) shall
be borne 50% by Seller and 50% by Purchaser, except however, if any litigation arises under this
Agreement with respect to the Deposit, all costs and expenses of the litigation shall be borne by
whichever of Seller or Purchaser is the losing party.
(g) Escrow Agent has acknowledged agreement to these provisions by signing in the
place indicated on the signature page of this Agreement.
Section 11.03 Indemnification of Escrow Agent. Seller and Purchaser hereby agree to, jointly
and severally, indemnify, defend, and hold harmless Escrow Agent from and against any liabilities,
damages, losses, costs, or expenses incurred by, or claims or charges made against Escrow Agent
(including reasonable attorneys' fees and disbursements) by reason of Escrow Agent acting or failing to
act in connection with any of the matters contemplated by this Agreement or in carrying out the terms of
this Agreement, except for those matters arising as a result of Escrow Agent's gross negligence or willful
misconduct.
Section 11.04 Survival. This Article shall survive the Closing or the termination of this
Agreement.
96
Item 9.
21
ARTICLE XII
CONFIDENTIALITY
Section 12.01 Confidential Information. Purchaser covenants and agrees not to communicate:
(a) the terms or any aspect of this Agreement and the transactions contemplated hereby; and (b) the
content of any and all information in respect of the Property which is supplied by Seller to Purchaser
(collectively, the "Confidential Information") to any person or entity, without the express written
consent of Seller; provided, however, that Purchaser may, without consent, disclose the Confidential
Information: (i) to its respective advisors, consultants, attorneys, accountants, partners, investors, and
lenders (the "Transaction Parties") without the express written consent of Seller, so long as any such
Transaction Parties to whom disclosure is made shall also agree to keep all such information
confidential in accordance with the terms hereof; and (ii) if disclosure is required by law or by
regulatory or judicial process or pursuant to any regulations promulgated by the New York Stock
Exchange or other public exchange for the sale and purchase of securities, provided that in such event
Purchaser shall notify the Seller in writing of such required disclosure, shall exercise all commercially
reasonable efforts to preserve the confidentiality of the Confidential Information, including, without
limitation, reasonably cooperating with the other party to obtain an appropriate order or other reliable
assurance that confidential treatment will be accorded such Confidential Information by such tribunal
and shall disclose only that portion of the Confidential Information which it is legally required to
disclose. The foregoing confidentiality obligations shall not apply to the extent that any such
Confidential Information is a matter of public record or is provided in other sources readily available to
the real estate industry other than as a result of disclosure by Purchaser or its Transaction Parties.
Purchaser hereby indemnifies Seller against, and holds Seller harmless from, any and all claims, losses,
damages, liabilities, and expenses (including, without limitation, reasonable attorneys' fees and
disbursements) arising in connection with Purchaser's obligations under this Section 12.01 and/or the
disclosure of any Confidential Information by Purchaser and/or by Purchaser's Transaction Parties in
violation of this Section 12.01. The provisions of this Section 12.01 shall survive the Closing or the
earlier termination of this Agreement.
Section 12.02 Return or Destruction of Confidential Information. As of the Closing Date or
in the event of a termination of this Agreement, if applicable, such confidentiality shall be maintained by
Purchaser and all Confidential Information in accordance with the written request of Seller shall be
either promptly: (a) returned to Seller; or (b) destroyed by Purchaser, with any such destruction
confirmed by Purchaser and its Transaction Parties in writing.
Section 12.03 Survival. The provisions of this Article shall survive the Closing Date or
termination of this Agreement.
ARTICLE XIII
BROKERS
Section 13.01 Brokers. Purchaser and Seller each represent and warrant to each other that they
dealt with no broker in connection with, nor has any broker had any part in bringing about, this
transaction.
Section 13.02 Survival. The provisions of this ARTICLE XIII shall survive the Closing, or the
termination of this Agreement prior to the Closing.
97
Item 9.
22
ARTICLE XIV
MISCELLANEOUS
Section 14.01 Governing Law. This Agreement shall be governed by, interpreted under, and
construed and enforced in accordance with the laws of the State of Texas.
Section 14.02 Merger; No Representations. This Agreement constitutes the sole and entire
agreement of the parties to this Agreement with respect to the subject matter contained herein and
supersedes all prior and contemporaneous understandings and agreements, both written and oral, with
respect to such subject matter. This Agreement is entered into after full investigation, with no party
relying upon any statement or representation, not set forth in this Agreement, made by any other party.
Section 14.03 No Survival. Except as otherwise provided in this Agreement, no representations,
warranties, covenants, or other obligations of Seller set forth in this Agreement shall survive the Closing
and no action based thereon shall be commenced after the Closing.
Section 14.04 Limitation of Liability.
(a) No member of Seller, nor any Seller Related Party, shall have any personal
liability, directly or indirectly, under or in connection with this Agreement or any agreement
made or entered into under or pursuant to the provisions of this Agreement or any amendment or
amendments to any of the foregoing made at any time or times, heretofore and hereafter, and
Purchaser and its successors and assigns and, without limitation all other persons and entities,
shall look solely to Seller's assets for the payment of any claim or for any performance and
Purchaser, on behalf of itself and its successors and assigns, hereby waives any and all such
personal liability.
(b) No member or agent of Purchaser, nor any Purchaser Related Party shall have any
personal liability, directly or indirectly, under or in connection with this Agreement or any
agreement made or entered into under or pursuant to the provisions of this Agreement, or any
amendment or amendments to any of the foregoing made at any time or times, heretofore or
hereafter, and Seller and its successors and assigns and, without limitations, all other persons and
entities, shall look solely to Purchaser's assets for the payment of any claim or for any
performance, and Seller, on behalf of itself and its successors and assigns, hereby waives any and
all such personal liability.
Section 14.05 Business Days. Whenever any action must be taken (including the giving of
notices) under this Agreement during a certain time period (or by a particular date) that ends or occurs
on a non-business day, then such period (or date) shall be extended until the next succeeding business
day. As used herein, the term "business day" shall be deemed to mean any day other than a Saturday, a
Sunday, or a legal holiday on which national banks are not open for business in the State of Texas.
Section 14.06 Modifications and Amendments. This Agreement cannot under any
circumstance be modified or amended orally and no agreement shall be effective to waive, change,
modify, terminate, or discharge this Agreement, in whole or in part, unless such agreement is in writing
and is signed by both Seller and Purchaser.
98
Item 9.
23
Section 14.07 No Recording. Neither this Agreement, nor any memorandum of this Agreement,
shall be recorded. The recording of this Agreement, or any memorandum of this Agreement, by
Purchaser shall constitute a material default and shall entitle Seller to retain the Deposit and any interest
earned thereon.
Section 14.08 Successors and Assigns; Assignment. This Agreement shall be binding upon
and shall inure to the benefit of the parties hereto and their respective heirs or successors and permitted
assigns. Purchaser may not assign or otherwise transfer this Agreement, or any of its rights or
obligations hereunder, without the prior written consent of Seller, which consent may be withheld in
Seller's sole discretion. Any purported assignment without Seller's consent shall be void and of no force
or effect. Any change in control of Purchaser or of any of the direct or indirect ownership interests in
Purchaser, at any level or tier of ownership, whether in one transaction or a series of transactions, shall
constitute an assignment for purposes of this Section 14.08.
Section 14.09 Severability. If any term or provision of this Agreement is invalid, illegal, or
unenforceable in any jurisdiction, such invalidity, illegality, or unenforceability shall not affect,
invalidate, or render unenforceable any other term or provision of this Agreement. Upon such
determination that any term or other provision is invalid, illegal, or unenforceable, the parties hereto
shall negotiate in good faith to modify this Agreement so as to affect the original intent of the parties as
closely as possible in a mutually acceptable manner in order that the transactions contemplated by this
Agreement be consummated as originally contemplated to the greatest extent possible.
Section 14.10 Further Assurances. Each of the parties hereto shall execute and deliver such
additional documents, instruments, conveyances, and assurances and take such further actions as may be
reasonably required to carry out the provisions of this Agreement and give effect to the transactions
contemplated hereby, provided such documents are customarily delivered in real estate transactions in
Texas and do not impose any material obligations upon any party hereunder except as set forth in this
Agreement.
Section 14.11 Counterparts. This Agreement may be executed by the parties in separate
counterparts, each of which when so executed and delivered shall be an original for all purposes, but all
such counterparts shall together constitute but one and the same instrument.
Section 14.12 Time Is of the Essence. The parties hereto acknowledge and agree that, except as
otherwise expressly provided in this Agreement, TIME IS OF THE ESSENCE for the performance of
all actions (including, without limitation, the giving of Notice, the delivery of documents, and the
funding of money) required or permitted to be taken under this Agreement. Whenever action must be
taken (including, without limitation, the giving of Notice, the delivery of documents, or the funding of
money) under this Agreement, prior to the expiration of, by no later than, or on a particular date, unless
otherwise expressly provided in this Agreement, such action must be completed by 12:00 pm Central
Time on such date, provided that such action must be completed by 12:00 pm CentralTime with respect
to the payment of the balance of the Purchase Price and other payments by Purchaser on the Closing
Date. However, notwithstanding anything to the contrary herein, whenever action must be taken
(including, without limitation, the giving of Notice, the delivery of documents, or the funding of money)
under this Agreement prior to the expiration of, by no later than, or on a particular date that is not a
business day, then such date shall be extended until the immediately following business day.
99
Item 9.
24
Section 14.13 Headings. The captions or paragraph titles contained in this Agreement are for
convenience and reference only and shall not be deemed a part of the text of this Agreement.
Section 14.14 No Waivers. No waiver by any party of any of the provisions hereof shall be
effective unless explicitly set forth in writing and signed by the party providing the waiver. No waiver
by either party of any failure or refusal to comply with any obligations under this Agreement shall be
deemed a waiver of any other or subsequent failure or refusal to so comply.
Section 14.15 No Offer. This Agreement shall not be deemed an offer or binding upon Seller or
Purchaser until this Agreement is fully executed and delivered by Seller and Purchaser.
Section 14.16 Waiver of Jury Trial. SELLER AND PURCHASER HEREBY WAIVE TRIAL
BY JURY IN ANY ACTION, PROCEEDING, OR COUNTERCLAIM (WHETHER ARISING IN
TORT OR CONTRACT) BROUGHT BY SUCH PARTY AGAINST THE OTHER ON ANY
MATTER ARISING OUT OF OR IN ANY WAY CONNECTED WITH THIS AGREEMENT.
Section 14.17 Statutory Disclosure Provisions. The following disclosure is made for the
purpose of complying with specific statutory provisions of Texas law, and such disclosure is not
intended to and does not alter or affect the rights and obligations of Purchaser and Seller:
(b) Notice to Purchaser Regarding Restrictive Covenants. Pursuant to the Texas
Local Government Code, if the governing body of a municipality has required any person who
sells or conveys restricted property located within its jurisdiction to first give written notice to
the purchaser of: (i) the restrictions; and (ii) the municipality's right to enforce compliance with
the restrictions, written notice must be given to the purchaser on or before the final closing, and
the notice document must be signed and acknowledged by both the seller and the purchaser, then
recorded in the real property records in the county where the real property is located. The
requirements and text of the notice may be found at 30 Tex. Loc. Gov't Code Ann. § 212.155.
[SIGNATURE PAGE FOLLOWS]
100
Item 9.
25
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed as of the date
first written above by their respective officers thereunto duly authorized.
PURCHASER:
City of Sanger, a Texas Home Rule Municipal
Corporation
By:
Name:
Title:
SELLER:
Sanger Texas Industrial Development
Corporation, a Texas non-profit corporation
By:
Name:
Title:
ESCROW AGENT:
{ESCROW AGENT NAME}
By:
Name:
Title:
101
Item 9.
26
EXHIBIT A
LEGAL DESCRIPTION
Lot 2R and 3R, Block A, SANGER INDUSTRIAL ADDITION, LOTS 1R, 2R & 3R, a subdivision in
Denton County, Texas
102
Item 9.
27
EXHIBIT B
LEASES AND RENT ROLLS
None
103
Item 9.
28
EXHIBIT C
EXCLUDED PERSONAL PROPERTY
None
104
Item 9.
29
EXHIBIT D
PERMITTED EXCEPTIONS
{PERMITTED EXCEPTION}
105
Item 9.
THE FOLLOWING COMMITMENT FOR TITLE INSURANCE IS NOT VALID UNLESS YOUR NAME AND THE
POLICY AMOUNT SHOWN IN SCHEDULE A, AND OUR AUTHORIZED REPRESENTATIVE HAS
COUNTERSIGNED BELOW.
COMMITMENT FOR TITLE INSURANCE
Issued by:
760 N.W. 107 Avenue, Suite 401, Miami, FL 33172 or
We, North American Title Insurance Company, a California corporation, will issue our title insurance policy or policies
(the Policy) to You (the proposed insured) upon payment of the premium and other charges due, and compliance with the
requirements in Schedule B and Schedule C. Our Policy will be the form approved by the Texas Department of Insurance at
the date of issuance, and will insure your interest in the land described in Schedule A. The estimated premium for our
Policy and applicable endorsements is shown on Schedule D. There may be additional charges such as recording fees, and
expedited delivery expenses.
This Commitment ends ninety (90) days from the effective date, unless the Policy is issued sooner, or failure to issue the
Policy is our fault. Our liability and obligations to you are under the express terms of this Commitment and end when this
Commitment expires
In witness whereof, North American Title Insurance Company has caused its corporate name and seal to be hereunto affixed
by its duly authorized officers, the Commitment to become valid when countersigned by an authorized officer or agent of
the Company.
Authorized Signatory
CONDITIONS AND STIPULATIONS
1. If you have actual knowledge of any matter which may affect the title or mortgage covered by this Commitment that is
not shown in Schedule B you must notify us in writing. If you do not notify us in writing, our liability to you is ended
or reduced to the extent that your failure to notify us affects our liability. If you do notify us, or we learn of such
matter, we may amend Schedule B, but we will not be relieved of liability already incurred.
2. Our liability is only to you, and others who are included in the definition of Insured in th e Policy to be issued. Our
liability is only for actual loss incurred in your reliance on this Commitment to comply with its requirements or to
acquire the interest in the land. Our liability is limited to the amount shown in Schedule A of this commitment and will
be subject to the following terms of the Policy: Insuring Provisions, Conditions and Stipulations, and Exclusions.
(THIS COMMITMENT IS INVALID UNLESS SCHEDULES A, B, C AND D ARE ATTACHED HERETO.)
106
Item 9.
Texas Form T-7 Commitment for Title Insurance
Form T-7 Commitment (Jacket) Page 2 of 18
TEXAS TITLE INSURANCE INFORMATION
Title insurance insures you against loss resulting from certain risks to your title.
The Commitment for Title Insurance is the title insurance company's promise to issue the title insurance policy. The
commitment is a legal document. You should review it carefully to completely understand it before your closing date.
El seguro de titulo le asegura en relacion a perdidas resultantes de ciertos riesgos que pueden afectar el titulo de su propi edad.
El compromiso para Seguro de Titulo es la promesa de la compania ase guradora de titulos de emitir la poliza de seguro de
titulo. El Compromiso es un documento legal. Usted debe leerlo cuidadosamente y entenderlo completamente antes de la
fecha para finalizar su transaccion.
Your commitment for Title Insurance is a legal contract between you and us. The Commitment is not an opinion or report of your
title. It is a contract to issue you a policy subject to the Commitment's terms and requirements.
Before issuing a Commitment for Title Insurance (the Commitment) or a Title Insurance Policy (the Policy), the Title Insurance
Company (the Company) determines whether the title is insurable. This determination has already been made. Part of that
determination involves the Company's decision to insure the title except for certain risks that will not be covered by the Policy. Some
of these risks are listed in Schedule B of the attached Commitment as Exceptions. Other risks are stated in the policy as Ex clusions.
These risks will not be covered by the Policy. The Policy is not an abstract of title nor does a Company have an obligation to
determine the ownership of any mineral interest.
MINERALS AND MINERAL RIGHTS may not be covered by the Policy. The Company may be unwilling to insure title unless there
is exclusion or an exception as to the Mineral and Mineral Rights in the Policy. Optional endorsements insuring certain risks involving
minerals, and the use of improvements (excluding lawns, shrubbery and trees) and permanent buildings may be available for pur chase.
If the title insurer issues the title policy with an exclusion or exception to the minerals and mineral rights, neither this policy nor th e
optional endorsements, ensure that he purchaser has title to the mineral rights related to the surface estate.
Another part of the determination involves whether the promise to insure is conditioned upon certain requirements being met.
Schedule C of the Commitment lists these requirements that must be satisfied or the Company will refuse to cover them. You ma y
want to discuss any matters shown in Schedules B and C of the Commitment with an attorney. These matters will affect your title and
your use of the land.
When your Policy is issued, the coverage will be limited by the Policy's Exceptions, Exclusions and Conditions, defined be low.
• EXCEPTIONS are title risks that a Policy generally covers but does not cover in a particular instance. Exceptions are
shown on Schedule B or discussed in Schedule C of the Commitment. They can also be added if you do not comply
with the Illnesses section of the Commitment. When the Policy is issued, all Exceptions will be on Schedule B of the
Policy.
• EXCLUSIONS are title risks that a Policy generally does not cover. Exclusions are contained in the Policy but not
shown or discussed in the Commitment.
• CONDITIONS are additional provisions that qualify or limit your coverage. Conditions include your responsibilities
and those of the Company. They are contained in the Policy but not shown or discussed in the Commitment. The Policy
Conditions are not the same as the Commitment Conditions.
You can get a copy of the policy form approved by the State Board of Insurance by calling the North American Title Insurance
Company at 1-800-374-8475 (Eastern States) or 1- (800) 869-3434 (Western States) or by calling the title insurance agent that issued
the Commitment. The Texas Department of Insurance may revise the policy form from time to time.
You can also get a brochure that explains the policy from the Texas Department of Insurance by calling 1 -800-252-3439.
Before the policy is issued, you may request changes in the Policy. Some of the changes to consider are:
Request amendment of the "area and boundary" exception (Schedule B, paragraph 2). To get this amendment, you must furnish a
survey and comply with other requirements of the Company. On the Owner’s Policy, you must pay an additional premium for the
amendment. If the survey is acceptable to the Company, and if the Company’s other requirements are met, your Policy will ins ure
you against loss because of discrepancies or conflicts in boundary lines, encroachments or protrusions, or overlapping of
improvements. The Company may then decide not to insure against specific boundary or survey problems by making special
exceptions in the Policy. Whether o r not you request amendment of the "area and boundary" exception, you should determine whether
you want to purchase and review a survey is a survey is not being provided to you.
107
Item 9.
Texas Form T-7 Commitment for Title Insurance
Form T-7 Commitment (Jacket) Page 3 of 18
Allow the Company to add an exception to "rights of parties in possession". I f you refuse this exception, the Company or the Title
insurance agent may inspect the property. The Company may except to and not insure you against the rights of specific persons , such
as renters, adverse owners or easement holders who occupy the land. Th e Company may charge you for the inspection. If you want to
make your own inspection, you must sign a Waiver of Inspection form and allow the Company to add this exception to your Polic y.
The entire premium for a Policy must be paid when the Policy is issued. You will not owe any additional premiums unless you want to
increase your coverage at a later date and the Company agrees to add an Increased Value Endorsement.
IMPORTANT NOTICE
FOR INFORMATION, OR TO MAKE A COMPLAINT
CALL OUR TOLL-FREE TELEPHONE NUMBER
1-800-374-8475 (TEXAS and Eastern States)
1-800-369-3434 (Western States)
ALSO YOU MAY CONTACT THE TEXAS
DEPARTMENT OF INSURANCE AT
1-800-252-3439
to obtain information on:
1. filing a complaint against an insurance company or
agent,
2. whether an insurance company or agent is licensed,
3. complaints received against an insurance company or
agent.
4. policyholder rights, and
5. a list of consumer publications and services available
through the Department.
YOU MAY ALSO WRITE TO
THE TEXAS DEPARTMENT OF
INSURANCE
P.O. BOX 149104
AUSTIN, TEXAS 78714-9104
FAX NO. (512) 490-1007
Web: http://www.tdi.texas.gov
E-Mail: ConsumerProtection@tdi.texas.gov
AVIVSO IMPORTANTE
PARA INFORMACION, O PARA SOMETER UNA
QUEJA LLAME AL NUMERO GRATIS
1-800-374-8475 (TEXAS and Eastern States)
1-800-869-3434 (Western States)
TAMBIEN PUEDE COMUNICARSE CON
EL DEPARTMENTO DE SEGUROS DE TEXAS AL
1-800-252-3439
para obtener informacion sobre:
1. como someter una queja en contra de una compania de
seguros o agente de seguros,
2. si una compania de seguros o agente de
seguros tiene licencia,
3. quejas recibidas en contra de una compania de seguros o
agente de seguros,
4. los derechos del asegurado, y
5. una lista de publicaciones y servicios para consumidores
disponibles a traves del Departmento.
TAMBIEN PUEDE ESCRIBIR AL
DEPARTMENTO DE SEGUROS DE
TEXAS
P.O. BOX 149104
AUSTIN, TEXAS 78714-9104
FAX NO. (512) 490-1007
Web: http://www.tdi.texas.gov
E-Mail: ConsumerProtection@tdi.texas.gov
760 N.W. 107 Avenue, Suite 401, Miami, FL 33172
108
Item 9.
North American Title Insurance Company
COMMITMENT FOR TITLE INSURANCE
SCHEDULE A
FORM T-7: Commitment for Title Insurance
Schedule A 14800-23-00197
Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent
Effective Date: January 2, 2023 at 12:00 AM GF No.: 14800-23-00197
Commitment No. 14800-23-00197, issued January 13, 2023, 12:00 AM
1. The policy or policies to be issued are:
a. OWNER'S POLICY OF TITLE INSURANCE (Form T-1)
(Not applicable for improved one-to-four family residential real estate)
Policy Amount:
PROPOSED INSURED:
b. TEXAS RESIDENTIAL OWNER'S POLICY OF TITLE INSURANCE
ONE-TO-FOUR FAMILY RESIDENCES (Form T-1R)
Policy Amount: $1,500,000.00
PROPOSED INSURED: Sanger Economic Development Corporation
c. LOAN POLICY OF TITLE INSURANCE (Form T-2)
Policy Amount:
PROPOSED INSURED:
Proposed Borrower:
d. TEXAS SHORT FORM RESIDENTIAL LOAN POLICY OF TITLE INSURANCE (Form T-2R)
Policy Amount:
PROPOSED INSURED:
Proposed Borrower:
e. LOAN TITLE POLICY BINDER ON INTERIM CONSTRUCTION LOAN (Form T-13)
Binder Amount:
PROPOSED INSURED:
Proposed Borrower:
f. OTHER
Policy Amount:
PROPOSED INSURED:
2. The interest in the land covered by this Commitment is:
Fee Simple
3. Record title to the land on the Effective Date appears to be vested in:
Sanger Texas Industrial Development Corporation, a Texas non-profit corporation
109
Item 9.
SCHEDULE A
(Continued)
FORM T-7: Commitment for Title Insurance
Schedule A 14800-23-00197
Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent
4. Legal description of land:
Lot 2R and 3R, Block A, SANGER INDUSTRIAL ADDITION, LOTS 1R, 2R & 3R, a subdivision in Denton
County, Texas according to the map or plat of record in Document No. 2019-33, Plat Records, Denton
County, Texas.
110
Item 9.
SCHEDULE B
Commitment No.: 14800-23-00197 GF No.: 14800-23-00197
EXCEPTIONS FROM COVERAGE
FORM T-7: Commitment for Title Insurance
Schedule B 14800-23-00197
Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent
In addition to the Exclusions and Conditions and Stipulations, your Policy will not cover loss, costs, attorn ey's
fees, and expenses resulting from:
1. The following restrictive covenants of record itemized below:
Document No. 2019-33, Plat Records, Denton County, Texas.
Note: To the extent that these restrictions violate 42 USC 3604(c) by indicating a pref erence, limitation or
discrimination based on race, color, religion, sex, handicap, familial status or national origin, such
restrictions are hereby omitted.
2. Any discrepancies, conflicts, or shortages in area or boundary lines, or any encroachments o r
protrusions, or any overlapping of improvements.
3. Homestead or community property or survivorship rights, if any of any spouse of any insured. (Applies to
the Owner's Policy only.)
4. Any titles or rights asserted by anyone, including, but not limited to, persons, the public, corporations,
governments or other entities,
a. to tidelands, or lands comprising the shores or beds of navigable or perennial rivers and streams,
lakes, bays, gulfs or oceans, or
b. to lands beyond the line of the harbor or bulkhead lines as established or changed by any
government, or
c. to filled-in lands, or artificial islands, or
d. to statutory water rights, including riparian rights, or
e. to the area extending from the line of mean low tide to the line of vegetation, or the rights of
access to that area or easement along and across that area.
(Applies to the Owner's Policy only.)
5. Standby fees, taxes and assessments by any taxing authority for the year 2023, and subsequent years;
and subsequent taxes and assessments by any taxing authority for prior years due to change in land
usage or ownership, but not those taxes or assessments for prior years because of an exemption granted
to a previous owner of the property under Section 11.13, Texas Tax C ode, or because of improvements
not assessed for a previous tax year. (If Texas Short form Residential Loan Policy (T -2R) is issued, that
policy will substitute "which become due and payable subsequent to Date of Policy" in lieu of "for the year
2023, and subsequent years.")
6. The terms and conditions of the documents creating your interest in the land.
111
Item 9.
SCHEDULE B
(Continued)
FORM T-7: Commitment for Title Insurance
Schedule B 14800-23-00197
Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent
7. Materials furnished or labor performed in connection with planned construction before signing and
delivering the lien document described in Schedule A, if the land is part of the homestead of the owner.
(Applies to the Loan Title Policy Binder on Interim Construction Loan only, and may be deleted if
satisfactory evidence is furnished to us before a binder is issued.)
8. Liens and leases that affect the title to the land, but that are subordinate to the lien of the insured
mortgage. (Applies to Loan Policy (T-2) only.)
9. The Exceptions from Coverage and Express Insurance in Schedule B of the Texas Short Form
Residential Loan Policy of Title Insurance (T-2R). (Applies to Texas Short Form Residential Loan Policy
of Title Insurance (T-2R) only.) Separate exceptions 1 through 8 of this Schedule B do not apply to the
Texas Short Form Residential Loan Policy of Title Insurance (T -2R).
10. The following matters and all terms of the documents creating or offering evidence of the matters:
a. Visible and apparent easements on or across the property covered by this policy which may not
appear of record. (This item will not appear on Schedule "B" of the p olicy if a survey is provided
by an approved surveyor showing no such easements.)
b. Rights of parties in possession. (Affects Owner Policy Only).
c. All leases, grants, exceptions or reservations of coal, lignite, oil, gas and other minerals, together
with all rights, privileges and immunities relating thereto, appearing in the Public Records whether
listed in Schedule B or not. There may be leases, grants, exceptions or reservations of mineral
interest that are not listed.
d. Any portion of the subject property lying within the boundaries of a public or private roadway
whether dedicated or not, or which may be used for road or street purposes.
e. Any encroachment, encumbrance, violation, variation, or adverse circumstance affecting the title
that would be disclosed by an accurate and complete land survey of the land. (Note: Upon receipt
of a survey acceptable to Company, this exception will be deleted. Company reserves the right to
add additional exceptions per its examination of said survey.
f. A 15 foot sanitary sewer easement across the west side of Lot 3R, as shown on the recorded
plat.
g. A 15 foot water easement across the west side of Lot 3R, as shown on the recorded plat.
h. Communications Easement and Right-of-Way reserved in instrument recorded in Volume 801,
Page 222, Deed Records of Denton County, Texas.
i. Sewer Easement and Right-of-Way reserved in instrument recorded in Volume 833, Page 619,
Deed Records of Denton County, Texas.
j. Utility Easement and Right-of-Way reserved in instrument recorded in Volume 1055, Page 125,
Deed Records of Denton County, Texas.
112
Item 9.
SCHEDULE B
(Continued)
FORM T-7: Commitment for Title Insurance
Schedule B 14800-23-00197
Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent
k. Electric Transmission and/or Distribution Line Easement and Right-of-Way granted to Brazos
Electric Power Cooperative, Inc. recorded in Volume 818, Page 637, Deed records, Denton
County, Texas.
l. Mineral and/or royalty interest in all of the oil, gas, and other minerals and/or other substances in
and under the subject property, including royalties, bonuses, rentals, ingress/egress and all other
rights as set out in Volume 801, Page 222, Deed Records, Denton County, Texas, together with
all rights, express or implied, in and to the subject property, arising out of or connected with said
interest, reference to which instrument is here made for all purposes. Title to said interest has not
been investigated subsequent to the date of the aforesaid instrument. The Company makes no
representation to the present ownership of this interest.
m. Terms and provisions of Landlords Waiver and Lease Agreement, recorded in Volume 5085,
Page 2792, Official Public Records, Denton County, Texas.
113
Item 9.
SCHEDULE C
Commitment No.: 14800-23-00197 GF No.: 14800-23-00197
FORM T-7: Commitment for Title Insurance
Schedule C 14800-23-00197
Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent
Your Policy will not cover loss, costs, attorney's fees, and expenses resulting from the following requirements
that will appear as Exceptions in Schedule B of the Policy, unless y ou dispose of these matters to our
satisfaction, before the date the Policy is issued:
1. 1
.
Documents creating your title or interest must be approved by us and must be signed, notarized and
filed for record.
2. 2
.
Satisfactory evidence must be provided that:
a. no person occupying the land claims any interest in that land against the persons named in
paragraph 3 of Schedule A,
b. all standby fees, taxes, assessments and charges against the property have been paid,
c. all improvements or repairs to the property are completed and accepted by the owner, and that
all contractors, sub-contractors, laborers and suppliers have been fully paid, and that no
mechanic's, laborer's or materialmen's liens have attached to the property,
d. there is legal right of access to and from the land,
e. (on a Loan Policy only) restrictions have not been and will not be violated that affect the validity
and priority of the insured mortgage.
3. 3
.
You must pay the seller or borrower the agreed amount for your property or interest.
4. 4
.
Any defect, lien or other matter that may affect title to the land or interest insured, that arises or is filed
after the effective date of this Commitment.
5. Procedural Rule P-27 promulgated by the Texas Department of insurance provides a list of the types of
financial documents and instruments which satisfy the requirement that we disburse only when we have
received good funds as required by said rule and Section 2651.202 Insurance Code. Please be advised
that we reserve the right to determine on a case-by-case basis what form of good funds is acceptable.
6. Upon request and receipt of applicable premium, if any, and in accordance with Texas Procedural Rule P -
50.1, T-19.2 and/or T-19.3 Minerals and Surface Damage Endorsements will be issued at the time of
closing of this transaction.
7. Must be furnished proof owner is a valid corporation and is in good standing with the State Comptroller's
office. Must be furnished proper resolution authorizing this transaction and naming the person(s)
authorized to execute documents.
8. We must be furnished with a properly executed Affidavit of Debts and Liens, executed by the record
owner and/or seller.
We must be furnished with a properly executed Waiver of Inspection executed by the Purchaser(s).
This file must be updated prior to closing.
114
Item 9.
SCHEDULE C
(Continued)
FORM T-7: Commitment for Title Insurance
Schedule C 14800-23-00197
Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent
9. "Note for information purposes only: No deeds were found of record affecting the subject property in the
last 24 months, The last deed of record is recorded under Document No. 2009-70797, Denton County,
Texas."
DOMA INSURANCE AGENCY OF TEXAS, INC. FEE ATTORNEY OFFICE
Authorized Signatory
115
Item 9.
SCHEDULE D
Commitment No.: 14800-23-00197 GF No.: 14800-23-00197
FORM T-7: Commitment for Title Insurance
Schedule D 14800-23-00197
Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent
Pursuant to the requirements of Rule P-21, Basic Manual of Rules, Rates and Forms for the writing of Title
Insurance in the State of Texas, the following disclosures are made:
1. The issuing Title Insurance Company, North American Title Insurance Company, is a corporation whose
shareholders owning or controlling, directly or indirectly, 10% of said corporation, directors and officers are
listed below:
Shareholders: North American Title Insurance Company which is a wholly owned subsidiary of Doma
Holdings, Inc., a Delaware corporation.
Directors: Max Simkoff, Emilio Fernandez, Noaman Ahmad, Eric Watson, Mike Smith.
Officers: President and Chief Executive Officer: Emilio Fernandez; Executive Vice President and Secretary:
Valerie Jahn-Grandin; Chief Financial Officer and Treasurer: Mike Smith; Vice President, Senior Regional
Underwriting Counsel: Virginia Abiassi
2. The following disclosures are made by the Title Insura nce Agent issuing this Commitment:
a. A listing of each shareholder, owner, partner, or other person having, owning or controlling one percent
(1%) or more of the Title Insurance Agent that will receive a portion of the premium: None
b. A listing of each shareholder, owner, partner, or other person having, owning or controlling 10 percent
(10%) or more of an entity that has, owns or controls one percent (1%) or more of the Title Insurance Agent
that will receive a portion of the premium: None
c. The names of the officers and directors of the Title Insurance Agent are as follows:
President: Max Simkoff; Treasurer: Mike Smith; Secretary: Eric Watson
3. You are entitled to receive advance disclosure of settlement charges in connection with the prop osed
transaction to which this commitment relates. Upon your request, such disclosure will be made to you.
Additionally, the name of any person, firm or corporation receiving any sum from the settlement of this
transaction will be disclosed on the closing or settlement statement.
You are further advised that the estimated title premium* is:
Owner’s Policy $ 7,740.00
Loan Policy $ 0
Endorsement Charges $ 0.00
Other $ 0.00
Total $ 7,740.00
Of this total amount: 15% will be paid to the policy issuing Title Insurance Company; 85% will be retained by the
issuing Title Insurance Agent; and the remainder of the estimated premium will be paid to other parties as follows:
Amount To Whom For Services
*The estimated premium is based upon informat ion furnished to us as of the date of this Commitment for Title
Insurance. Final determination of the amount of the premium will be made at closing in accordance with the
Rules and Regulations adopted by the Commissioner of Insurance.
116
Item 9.
SCHEDULE D
(Continued)
FORM T-7: Commitment for Title Insurance
Schedule D 14800-23-00197
Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent
This commitment is invalid unless the insuring provisions and Schedules A, B, and C are attached.
117
Item 9.
FORM T-7: Commitment for Title Insurance
Deletion of Arbitration Provision 14800-23-00197
Doma Insurance Agency of Texas, Inc. Fee Attorney Office Policy Issuing Agent
DELETION OF ARBITRATION PROVISION
(Not applicable to the Texas Residential Owner's Policy)
Commitment No.: 14800-23-00197 GF No.: 14800-23-00197
ARBITRATION is a common form of alternative dispute resolution. It can be a quicker and cheaper means to
settle a dispute with your Title Insurance Company. However, if you agree to arbitrate, you give up your right to
take the Title Insurance Company to court and your rights to discovery of evidence may be limited in the
arbitration process. In addition, you cannot usually appeal an arbitrator's award.
Your policy contains an arbitration provision (shown below). It allows you or the Company to require
arbitration if the amount of insurance is $2,000,000 or less. If you want to retain your right to sue the
Company in case of a dispute over a claim, you must request deletion of the arbitration provision before
the policy is issued. You can do this by signing this form and ret urning it to the Company at or before the
closing of your real estate transaction or by writing to the Company.
The arbitration provision in the Policy is as follows:
"Either the Company or the Insured may demand that the claim or controversy shall be su bmitted to
arbitration pursuant to the Title Insurance Arbitration Rules of the American Land Title Association
(“Rules”). Except as provided in the Rules, there shall be no joinder or consolidation with claims or
controversies of other persons. Arbitrab le matters may include, but are not limited to, any controversy or
claim between the Company and the Insured arising out of or relating to this policy, any service in
connection with its issuance or the breach of a policy provision, or to any other controv ersy or claim
arising out of the transaction giving rise to this policy. All arbitrable matters when the Amount of
Insurance is $2,000,000 or less shall be arbitrated at the option of either the Company or the Insured,
unless the Insured is an individual person (as distinguished from an Entity). All arbitrable matters when
the Amount of Insurance is in excess of $2,000,000 shall be arbitrated only when agreed to by both the
Company and the Insured. Arbitration pursuant to this policy and under the Rules shall be binding upon
the parties. Judgment upon the award rendered by the Arbitrator(s) may be entered in any court of
competent jurisdiction."
SIGNATURE DATE
118
Item 9.
rev. 03/2014
Privacy Policy (NATG) 14800-23-00197
119
Item 9.
rev. 03/2014
120
Item 9.
rev. 03/2014
121
Item 9.
NORTH AMERICAN TITLE INSURANCE COMPANY
Commitment Number: 14800-23-00197
LEGAL DESCRIPTION
Legal description of the land:
Lot 2R and 3R, Block A, SANGER INDUSTRIAL ADDITION, LOTS 1R, 2R & 3R, a subdivision in Denton County,
Texas according to the map or plat of record in Document No. 2019-33, Plat Records, Denton County, Texas.
122
Item 9.
Lot 2R and 3R, Block A, SANGER INDUSTRIAL ADDITION, LOTS 1R, 2R & 3R, a subdivision in Denton County, Texas, according to the Map
or Plat of record in Document No. 2019-33, Plat Records, Denton County, Texas.
(Commonly known as 103 BOLIVAR STREET)
The plat hereon is a true and accurate representation of the property as determined by survey made on the ground, the lines and dimensions of
said property as being indicated on the Plat. The size, location and type of buildings and improvements are as shown, all improvements being
within the boundaries of property except as shown, set back from the property lines is as shown, and the nearest street or road is shown. Thereare no visible encroachments, visible protrusions or apparent easements, except as shown on the Plat. I further certify that no portion of subject
property lies within a special flood hazard area according to The FLOOD INSURANCE RATE MAP for Denton County and Incorporated Areas,
Map Number 48121CO210G, Dated April 18, 2011. (Subject property lies in Zone X)
______________________________________________
Jerald D. Yensan, Professional Land Surveyor
Texas R.P.L.S. No. 4561
DOSTER LAW GROUP G.F. 14800-23-00197
TX FIRM REGISTRATION NO. 10098600
DRAWN BY:
SCALE:DATE:
4238 I-35 NORTH
DENTON, TEXAS 76207
ANDMARK
SURVEYORS, LLC.SLB
1"=40'(940) 382-4016
FAX (940) 387-9784 JOB NO:
PURCHASER: SANGER ECONOMIC DEVELOPMENT CORP.
24 JANUARY, 2023 236775
Basis of Bearing is the State Plane Coordinate System, Texas North Central Zone
(4202), North American Datum of 1983, as determined from GPS observations.
123
Item 9.
Atmos Energy Corporation
5420 LBJ Freeway, Suite 1862
Dallas, TX 75240
P 214-206-2568 Christopher.Felan@atmosenergy.com
February 24, 2023
TO THE GOVERNING BODY OF THE CITIES IN THE ATMOS TEXAS MUNICIPALITIES
COALITION SERVED BY ATMOS ENERGY CORPORATION’S MID-TEX DIVISION
Dear City Official,
Please find enclosed the 2022 Interim Rate Adjustment Application (“IRA”) for the
incorporated areas of the Atmos Texas Municipalities Coalition (“ATM Cities”) served by Atmos
Energy Corporation’s Mid-Tex Division, (the “Mid-Tex Division” or the “Company”).
This filing includes information labeled as follows:
(a) The ATM Cities Interim Rate Adjustment Application (“IRA Application” Section)
and the Annual Earnings Monitoring Report (“EMR Report” Section).
(b) The Project Report describing the investment projects used by the Company in
providing utility service which were both completed and placed in service from
January 1, 2022 through December 31, 2022 as well as the investments retired or
abandoned from January 1, 2022 through December 31, 2022 (“Project Report”
Section). The Project Report also states the cost, need, and customers benefited by
the change in investment. A Project Report is also included which states the project
by FERC Account and amount.
(c) The Relocation Project Report providing certain supplemental information about
relocation project costs included in the Project Report for the period of January 1,
2022 through December 31, 2022 (“Relocation Project Report” Section).
(d) The affidavits of Christopher A. Felan and Barbara W. Myers. Mr. Felan’s
affidavits attest to (i) the method and date on which notice will be given to all
customers, and (ii) relocations. Ms. Myers provides an affidavit which verifies that
the Mid-Tex Division’s books and records are kept in accordance with the rules of
the Railroad Commission of Texas and verifies that the schedules enclosed are
Christopher A. Felan
Vice President
Rates & Regulatory Affairs
124
Item 10.
Atmos Energy Corporation
5420 LBJ Freeway, Suite 1862
Dallas, TX 75240
P 214-206-2568 Christopher.Felan@atmosenergy.com
summaries of the Mid-Tex Division’s books and records related to the invested
capital used by the Company in providing utility service (“Affidavits” Section).
The tariffs included in the enclosed package in the section designated “IRA Application”
following IRA-3 will be effective on April 25, 2023. These tariffs establish an IRA that will affect
the monthly customer charge or meter charge applicable to the ATM Cities. As authorized under
Section 104.301 of the Texas Utilities Code, the IRA will recover the difference between the values
of invested capital for the Mid-Tex Division’s system as of December 31, 2022, and the value of
the invested capital for the Mid-Tex Division’s system as of December 31, 2021. This investment
is used to provide gas services and the IRA will remain in effect until the issuance of a final
decision in a rate case that is filed after the implementation of these tariffs. All amounts collected
under these tariffs are subject to refund.
The IRA set forth in the tariffs accompanying this filing was calculated by applying the
methodologies approved by the Railroad Commission of Texas in GUD No. 10779 and the factors
established in the Final Order Finding of Fact Nos. 45 and 46 and Exhibit B. GUD No. 10779
established the latest effective rates for customers within the ATM Cities. Upon approval, the IRA
will be added to the customer/meter charges that are effective for customers within the ATM Cities.
Under Section 104.301, as amended, ATM Cities are provided the opportunity to review
the filing and either: (i) take final action before April 25, 2023; or (ii) suspend the effective date
of these tariffs for forty-five (45) days after April 25, 2023. The source documentation supporting
the new investment is available for review through Atmos Energy’s electronic databases. If you
wish to schedule an opportunity to review the electronic databases or any hard copy project files
related to the new investment, please contact me at 214-206-2568. In addition, the Company has
elected to make certain adjustments in this filing. These adjustments are detailed in the Company’s
IRA schedules. Elective adjustments have been made to remove certain employee expenses
identified via a detailed review of every employee expense report for items recorded to capital
projects for the Shared Services Division and the Mid-Tex Division. These expenses have been
removed to reduce controversy. The Company reserves its right to seek recovery of these expenses
in a rate proceeding involving a review of the Company’s invested capital through at least
December 31, 2022.
125
Item 10.
Atmos Energy Corporation
5420 LBJ Freeway, Suite 1862
Dallas, TX 75240
P 214-206-2568 Christopher.Felan@atmosenergy.com
Notice of this proceeding will be provided to affected customers in the incorporated areas
of the ATM Cities by bill insert or individual mailing within 45 days after the date of this filing in
accordance with Section 104.301. The tariffs included in the IRA Application Section of this
GRIP filing do not require any action on the part of your city to become effective on April 25,
2023.
In closing, please accept for filing this cover correspondence, the above mentioned tariffs,
filing package and enclosures. Please contact me with any questions you may have regarding this
filing.
Respectfully Submitted,
Chris Felan
126
Item 10.
ATMOS ENERGY CORP., MID-TEX DIVISION
ATMOS TEXAS MUNICIPALITIES COALITION
(“ATM Cities”)
INTERIM RATE ADJUSTMENT APPLICATION
TABLE OF CONTENTS
Interim Rate Adjustment Application – ATM Cities (“IRA Application”) – IRA-1
through IRA-23
Annual Earnings Monitoring Report – ATM Cities (“EMR Report”) – EMR-1
through EMR-5
Project Report:
Mid-Tex:
Additions
Retirements
SSU:
Additions
Retirements
Relocation Project Report
Affidavits
Christopher A. Felan (2)
Barbara W. Myers
127
Item 10.
This is an original submission.
Date of Submission: February 24, 2023
Twelve (12) Month Period Ending December 31, 2022
Interim Rate Adjustment Application
of
Atmos Energy Corp., Mid-Tex Division
to the
Atmos Texas Municipalities Coalition ("ATM")
for the
128
Item 10.
Tab Reference Schedule Description
IRA-1 General Information
IRA-2 Notice
IRA-3 Rate Schedules
IRA-4 Bill Comparisons
IRA-5 Interim Rate Adjustment Summary
IRA-5A Allocation Factors
IRA-5B Miscellaneous Adjustments
IRA-6 Direct Initial or Prior Year Plant
IRA-7 Direct Current Year Plant (Adjusted)
IRA-7A Direct Current Year Plant Adjustments
IRA-8 Direct Incremental Plant
IRA-9 Allocated Initial or Prior Year Plant - SSU
IRA-10 Allocated Current Year Plant (Adjusted) - SSU
IRA-10A Allocated Current Year Plant Adjustments - SSU
IRA-11 Allocated Incremental Plant - SSU
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Table of Contents
Table of Contents Page 1 of 2
129
Item 10.
Tab Reference Schedule Description
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Table of Contents
IRA-12 Direct Additions Project Report
IRA-13 Direct Retirements Project Report
IRA-14 Allocated Additions Project Report
IRA-15 Allocated Retirements Project Report
IRA-16 Direct Additions Detail
IRA-17 Direct Retirements Detail
IRA-18 Allocated Additions Detail
IRA-19 Allocated Retirements Detail
IRA-20 Federal Income Taxes
IRA-21 Ad Valorem and Other Taxes
IRA-22 Footnotes Page
IRA-23 Signature Page
Table of Contents Page 2 of 2
130
Item 10.
1.Provide the exact name of the utility.
Atmos Energy Corp., Mid-Tex Division
2. Provide the date when the utility was originally organized.
3.
4.
Name:Christopher Felan
Title:Vice President, Rates and Regulatory Affairs
Address:5420 LBJ Freeway, Suite 1800
Dallas, Texas 75240
Phone:214.206.2568
Email:christopher.felan@atmosenergy.com
5.
Name:Shelly Bass
Title:Associate General Counsel
Address:5430 LBJ Freeway, Suite 1800
Dallas, Texas 75240-2601
Phone:972.855.3756
Email:shelly.bass@atmosenergy.com
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
General Information
December 11, 1942
Describe any change in the utility name. Include the effective date of the change and state in which the
change took effect.
None.
Provide the name, title, phone number, email address, and office address for the Company
representative to whom correspondence should be addressed concerning this report.
Provide the name, title, phone number, email address, and office address of any other individual
designated by the utility to answer questions regarding this report (optional).
IRA-1 General Info Page 1 of 3
131
Item 10.
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
General Information
6.Provide the address for the office where the Company's records are kept.
7.This rate adjustment will impact the:
8.How many months are included in the filing period?
Twelve (12)
9.In what year does the test period end?
2022
10.What is the test period ending date for the prior filing? MM/DD/YYYY (Either a rate case or IRA)
Month (MM)12
Day (DD)31
Year (YYYY)2021
11.What is the submission date for this filing?
February 24, 2023
12.Is this an original or a revised submission? (Enter either 'an original' or 'a revised' below.)
an original
13.In what Gas Utilities Docket were current rates set? Provide the docket number only.
10779
14.Enter the docket number for the most recent rate case in which rates were set in this service area.
2021 MTX ATM Interim Rate Adjustment Filing
5420 LBJ Freeway, Suite 1800,
Dallas, Texas 75240
Initial Block Rate
Monthly Customer Charge
Monthly Capacity Charge
IRA-1 General Info Page 2 of 3
132
Item 10.
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
General Information
15.What is the cost of gas and transportation used in calculating average bills for IRA-4?
Rate R 1.03379$ per Ccf
Rate C 0.92209$ per Ccf
Rate I 6.7477$ per MMBtu
Rate T 0.4637$ per MMBtu
16.What Federal Income Tax rate was approved in the most recent rate case for this service area?
21%
17.What is the ad valorem tax rate based on the most recent rate case updated for the current period?
Direct 2.30%Please see IRA-21
Allocated SSU GO 0.79%Please see IRA-21
Allocated SSU CS 0.47%Please see IRA-21
18.
Capital
Structure Cost
Weighted
Cost
Common Equity 60.18% 9.80% 5.90%
Debt 39.82% 5.20% 2.07%
Total 100.00% 7.97%
19. If this is a revised application, identify each schedule number, line number, and column designation
where revised input data appears.
Complete the following weighted average cost of capital table using factors set in the most recent rate
case for this service area:
Please see Finding of Facts: 42 through 45
GUD No. 10779 Final Order References:
Please see Finding of Facts: 42 through 45
IRA-1 General Info Page 3 of 3
133
Item 10.
1. Attach the Company's proposed Notice.
Attached are sample copies of the Notices to be sent to Rate Schedules R, C, I, and T.
2. Please also provide an electronic copy of the proposed Notice in Microsoft Word with the filing.
3.
Included in the filing is an Affidavit by Christopher Felan that notice will be provided.
4.Completion of notice is required within 45 days from date of filing: April 10, 2023.
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Notice
Attach an affidavit that Notice has been or will be provided by direct mail or bill insert and include the date
notice was or will be provided.
Please see the enclosed flash drive for an electronic copy of the Notices in MS Word
format.
IRA-2 Notice Page 1 of 1
134
Item 10.
CUSTOMER NOTICE OF INTERIM RATE ADJUSTMENT
Pursuant to Texas Utilities Code Section 104.301, the Mid-Tex Division of Atmos Energy
Corporation (the “Company”), filed an application for an Interim Rate Adjustment with the
Cities in the Atmos Texas Municipalities Coalition (“ATM Cities”) on February 24, 2023.
This proposed Interim Rate Adjustment applies to all customers served by the Company
within the ATM Cities incorporated areas of the Mid-Tex Division and provides for the
recovery of additional capital investment incurred from January 1, 2022 through December
31, 2022. The request is for capital investment not included in any previous rate case or
rates for service, does not include the recovery of costs related to the winter event of
February 2021, and is subject to refund.
The Company proposes to increase the customer/meter charge used to calculate the
customer’s monthly bill by the amount listed below. The proposed Interim Rate
Adjustment effective date is April 25, 2023. In accordance with Texas Utilities Code
Section 104.101, the increase constitutes a major change in the Company’s rates.
TABLE 1
Rate
Schedule
Current
Customer
Charge
Proposed
2022
Interim Rate
Adjustment
Adjusted
Charge
Increase
Per Bill
Rate R –
Residential
Sales
$ 36.14
per customer
per month
$ 5.09
per customer
per month
$ 41.23
per customer
per month
$ 5.09
Rate C –
Commercial
Sales
$ 97.72
per customer
per month
$ 16.63
per customer
per month
$ 114.35
per customer
per month
$ 16.63
Persons with questions or who want more information about this filing may contact the
Company at 1-888-286-6700. A copy of the filing will be available for inspection during
normal business hours at the Company’s office at 5400 LBJ Freeway, Suite 1800, Dallas,
Texas, 75240 or on the Company's website at www.atmosenergy.com/MTXtariffs .
Any affected person within an ATM Cities incorporated area may contact his or her city
council. Please reference the ATM Cities Interim Rate Adjustment in your written
comment or protest.
135
Item 10.
AVISO A NUESTROS CLIENTES:
AJUSTE INTERINO DE TARIFAS
Conforme a la sección 104.301 del Código de Servicios Públicos de Texas, la División
Mid-Tex de Atmos Energy Corporation (la “Compañía”) presentó una solicitud para un
ajuste interino de tarifas con las Ciudades en la Coalición Atmos de Municipios Tejas
(“ATM Cities”) por sus siglas en inglés) el 24 de febrero del 2023. El ajuste interino de
tarifas propuesto aplicará a todos los clientes servidos por la Compañía dentro de las
áreas incorporadas de las ATM Cities en la División Mid-Tex de Atmos Energy y provee
la recuperación del costo de inversión adicional de capital incurrida desde el 1 de enero,
2022 hasta el 31 de diciembre, 2022. Esta solicitud es por inversión de capital no incluida
en cualquier ajuste de tarifas por servicio anterior, no incluye recuperación de los costos
relacionados con el evento de invierno en febrero, 2021, y está sujeta a reembolso.
La Compañía propone aumentar el cargo de cliente/medidor utilizado para calcular la
factura mensual del cliente según indicado en la tabla abajo. La fecha efectiva del Ajuste
Interino de Tarifas propuesto es el 25 de abril, 2023. El aumento constituye un cambio
mayor en las tarifas de la Compañía, tal como es definido en la sección 104.101 del Código
de Servicios Públicos de Texas.
TABLA 1
Tabla
de Tarifas
Cargo de Cliente
Actual
Propuesto
Ajuste Interino
2022
Cargo Ajustado
Aumento
por
Factura
Tarifa R -
Ventas
Residenciales
$36.14
por cliente
por mes
$5.09
por cliente
por mes
$41.23
por cliente
por mes
$5.09
Tarifa C -
Ventas
Comerciales
$97.72
por cliente
por mes
$16.63
por cliente
por mes
$114.35
por cliente
por mes
$16.63
Aquellas personas con preguntas o que deseen más información sobre esta solicitud pueden
ponerse en contacto con la Compañía al 1-888-286-6700. Pueden ver una copia de la
solicitud durante las horas normales de negocio en la oficina de la Compañía situada en
5400 LBJ Freeway, Suite 1800, Dallas, Texas 75240 o en la página web de la Compañía
en www.atmosenergy.com/MTXtariffs .
Cualquier persona afectada dentro de un área incorporada de las “ATM Cities” puede
ponerse en contacto con el ayuntamiento de su municipio. Debe incluir el referente “ATM
Cities Interim Rate Adjustment” en su comentario o protesta por escrito.
136
Item 10.
CUSTOMER NOTICE OF INTERIM RATE ADJUSTMENT
Pursuant to Texas Utilities Code Section 104.301, the Mid-Tex Division of Atmos Energy
Corporation (the “Company”), filed an application for an Interim Rate Adjustment with the
Cities in the Atmos Texas Municipalities Coalition (“ATM Cities”) on February 24, 2023.
This proposed Interim Rate Adjustment applies to all customers served by the Company
within the ATM Cities incorporated areas of the Mid-Tex Division and provides for the
recovery of additional capital investment incurred from January 1, 2022 through December
31, 2022. The request is for capital investment not included in any previous rate case or
rates for service, does not include the recovery of costs related to the winter event of
February 2021, and is subject to refund.
The Company proposes to increase the customer/meter charge used to calculate the
customer’s monthly bill by the amount listed below. The proposed Interim Rate
Adjustment effective date is April 25, 2023. In accordance with Texas Utilities Code
Section 104.101, the increase constitutes a major change in the Company’s rates.
TABLE 1
Rate
Schedule
Current
Customer
Charge
Proposed
2022
Interim Rate
Adjustment
Adjusted
Charge
Increase
Per Bill
Rate I –
Industrial
Sales
$ 1,772.57
per meter
per month
$ 306.86
per meter
per month
$ 2,079.43
per meter
per month
$ 306.86
Rate T –
Transportation
$ 1,772.57
per meter
per month
$ 306.86
per meter
per month
$ 2,079.43
per meter
per month
$ 306.86
Persons with questions or who want more information about this filing may contact the
Company at 1-888-286-6700. A copy of the filing will be available for inspection during
normal business hours at the Company’s office at 5400 LBJ Freeway, Suite 1800, Dallas,
Texas, 75240 or on the Company's website at www.atmosenergy.com/MTXtariffs .
Any affected person within an ATM Cities incorporated area may contact his or her city
council. Please reference the ATM Cities Interim Rate Adjustment in your written
comment or protest.
137
Item 10.
1. Attach the Company's proposed rate schedules.
Please see the following attached Rate Schedules:
Rate R - Residential Sales
Rate C - Commercial Sales
Rate I - Industrial Sales
Rate T - Transportation
2.
Please see the enclosed flash drive containing following files:
Residential (ATM Cities) Tariff - Clean.docx
Commercial (ATM Cities) Tariff - Clean.docx
Industrial (ATM Cities) Tariff - Clean.docx
Transportation (ATM Cities) Tariff - Clean.docx
Residential (ATM Cities) Tariff - Redline.docx
Commercial (ATM Cities) Tariff - Redline.docx
Industrial (ATM Cities) Tariff - Redline.docx
Transportation (ATM Cities) Tariff - Redline.docx
3. Proposed implementation Date (60 days from date of filing):
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Rate Schedules
Please also provide clean and redlined electronic copies of the proposed rate schedules in Microsoft Word
with the filing.
April 25, 2023.
IRA-3 Rate Schedules Page 1 of 1
138
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: R – RESIDENTIAL SALES
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Application
Applicable to Residential Customers for all natural gas provided at one Point of Delivery and measured
through one meter.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
service being furnished.
Monthly Rate
Customer's monthly bill will be calculated by adding the following Customer and Ccf charges to the amounts
due under the riders listed below:
Charge Amount
Customer Charge per Bill $ 18.85 per month
Rider CEE Surcharge $ 0.05 per month1
Interim Rate Adjustment (“IRA”) $ 22.33 per month2
Total Customer Charge $ 41.23 per month
Commodity Charge – All Ccf $0.14846 per Ccf
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated in
accordance with Part (a) and Part (b), respectively, of Rider GCR.
Weather Normalization Adjustment: Plus or Minus an amount for weather normalization calculated
in accordance with Rider WNA.
Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Agreement
An Agreement for Gas Service may be required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having
jurisdiction and to the Company’s Tariff for Gas Service.
1Reference Rider CEE - Conservation and Energy Efficiency as approved in GUD 10170. Surcharge billing effective July 1, 2022.
22018 IRA - $2.84, 2019 IRA - $4.71, 2020 IRA - $4.54, 2021 IRA - $5.15, 2022 IRA - $5.09. 139
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: R – RESIDENTIAL SALES
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Exhibit A
Cities in the Atmos Texas Municipalities Coalition:
AUSTIN STAR HARBOR
BALCH SPRINGS TRINIDAD
BANDERA WHITNEY
BLOOMING GROVE
BURNET
CAMERON
CEDAR PARK
CLIFTON
COMMERCE
COPPERAS COVE
CORSICANA
ELECTRA
FREDERICKSBURG
GATESVILLE
GOLDTHWAITE
GRANBURY
GREENVILLE
GROESBECK
HAMILTON
HEATH
HENRIETTA
HICKORY CREEK
HICO
HILLSBORO
LAMPASAS
LEANDER
LONGVIEW
MARBLE FALLS
MART
MEXIA
OLNEY
PFLUGERVILLE
POINT
PRINCETON
RANGER
RICE
RIESEL
ROCKDALE
ROGERS
ROUND ROCK
SAN ANGELO
SANGER
SOMERVILLE
140
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: C – COMMERCIAL SALES
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Application
Applicable to Commercial Customers for all natural gas provided at one Point of Delivery and measured
through one meter and to Industrial Customers with an average annual usage of less than 30,000 Ccf.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
service being furnished.
Monthly Rate
Customer's monthly bill will be calculated by adding the following Customer and Ccf charges to the amounts
due under the riders listed below:
Charge Amount
Customer Charge per Bill $ 43.50 per month
Rider CEE Surcharge $ (0.01) per month1
Interim Rate Adjustment (“IRA”) $ 70.86 per month2
Total Customer Charge $ 114.35 per month
Commodity Charge – All Ccf $ 0.09165 per Ccf
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated in
accordance with Part (a) and Part (b), respectively, of Rider GCR.
Weather Normalization Adjustment: Plus or Minus an amount for weather normalization calculated
in accordance with Rider WNA.
Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Agreement
An Agreement for Gas Service may be required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having
jurisdiction and to the Company’s Tariff for Gas Service.
Presumption of Plant Protection Level
For service under this Rate Schedule, plant protection volumes are presumed to be 10% of normal, regular,
historical usage as reasonably calculated by the Company in its sole discretion. If a customer believes it
needs to be modeled at an alternative plant protection volume, it should contact the company at
mdtx.plantprotection@atmosenergy.com.
1 Reference Rider CEE - Conservation and Energy Efficiency as approved in GUD 10170. Surcharge billing effective July 1, 2022.
2 2018 IRA - $8.74, 2019 IRA - $14.54, 2020 IRA - $14.48, 2021 IRA - $16.47, 2022 IRA - $16.63. 141
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: C – COMMERCIAL SALES
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Exhibit A
Cities in the Atmos Texas Municipalities Coalition:
AUSTIN STAR HARBOR
BALCH SPRINGS TRINIDAD
BANDERA WHITNEY
BLOOMING GROVE
BURNET
CAMERON
CEDAR PARK
CLIFTON
COMMERCE
COPPERAS COVE
CORSICANA
ELECTRA
FREDERICKSBURG
GATESVILLE
GOLDTHWAITE
GRANBURY
GREENVILLE
GROESBECK
HAMILTON
HEATH
HENRIETTA
HICKORY CREEK
HICO
HILLSBORO
LAMPASAS
LEANDER
LONGVIEW
MARBLE FALLS
MART
MEXIA
OLNEY
PFLUGERVILLE
POINT
PRINCETON
RANGER
RICE
RIESEL
ROCKDALE
ROGERS
ROUND ROCK
SAN ANGELO
SANGER
SOMERVILLE
142
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: I – INDUSTRIAL SALES
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Application
Applicable to Industrial Customers with a maximum daily usage (MDU) of less than 200 MMBtu per day for
all natural gas provided at one Point of Delivery and measured through one meter. Service for Industrial
Customers with an MDU equal to or greater than 200 MMBtu per day will be provided at Company's sole
option and will require special contract arrangements between Company and Customer.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
service being furnished.
Monthly Rate
Customer's monthly bill will be calculated by adding the following Customer and MMBtu charges to the
amounts due under the riders listed below:
Charge Amount
Customer Charge per Meter $ 784.00 per month
Interim Rate Adjustment (“IRA”) $ 1,295.43 per month1
Total Customer Charge $ 2,079.43 per month
First 0 MMBtu to 1,500 MMBtu $ 0.3312 per MMBtu
Next 3,500 MMBtu $ 0.2425 per MMBtu
All MMBtu over 5,000 MMBtu $ 0.0520 per MMBtu
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated in
accordance with Part (a) and Part (b), respectively, of Rider GCR.
Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Curtailment Overpull Fee
Upon notification by Company of an event of curtailment or interruption of Customer’s deliveries, Customer
will, for each MMBtu delivered in excess of the stated level of curtailment or interruption, pay Company
200% of the midpoint price for the Katy point listed in Platts Gas Daily published for the applicable Gas Day
in the table entitled “Daily Price Survey.”
1 2018 IRA - $155.80, 2019 IRA - $261.93, 2020 IRA - $261.77, 2021 IRA - $309.07, 2022 IRA - $306.86. 143
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: I – INDUSTRIAL SALES
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Replacement Index
In the event the “midpoint” or “common” price for the Katy point listed in Platts Gas Daily in the table entitled
“Daily Price Survey” is no longer published, Company will calculate the applicable imbalance fees utilizing
a daily price index recognized as authoritative by the natural gas industry and most closely approximating
the applicable index.
Agreement
An Agreement for Gas Service may be required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having
jurisdiction and to the Company’s Tariff for Gas Service.
Special Conditions
In order to receive service under Rate I, Customer must have the type of meter required by Company.
Customer must pay Company all costs associated with the acquisition and installation of the meter.
Presumption of Plant Protection Level
For service under this Rate Schedule, plant protection volumes are presumed to be 10% of normal, regular,
historical usage as reasonably calculated by the Company in its sole discretion. If a customer believes it
needs to be modeled at an alternative plant protection volume, it should contact the company at
mdtx.plantprotection@atmosenergy.com.
144
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: I – INDUSTRIAL SALES
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Exhibit A
Cities in the Atmos Texas Municipalities Coalition:
AUSTIN STAR HARBOR
BALCH SPRINGS TRINIDAD
BANDERA WHITNEY
BLOOMING GROVE
BURNET
CAMERON
CEDAR PARK
CLIFTON
COMMERCE
COPPERAS COVE
CORSICANA
ELECTRA
FREDERICKSBURG
GATESVILLE
GOLDTHWAITE
GRANBURY
GREENVILLE
GROESBECK
HAMILTON
HEATH
HENRIETTA
HICKORY CREEK
HICO
HILLSBORO
LAMPASAS
LEANDER
LONGVIEW
MARBLE FALLS
MART
MEXIA
OLNEY
PFLUGERVILLE
POINT
PRINCETON
RANGER
RICE
RIESEL
ROCKDALE
ROGERS
ROUND ROCK
SAN ANGELO
SANGER
SOMERVILLE
145
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: T – TRANSPORTATION
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Application
Applicable, in the event that Company has entered into a Transportation Agreement, to a customer directly
connected to the Atmos Energy Corp., Mid-Tex Division Distribution System (Customer) for the
transportation of all natural gas supplied by Customer or Customer’s agent at one Point of Delivery for use
in Customer's facility.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
service being furnished.
Monthly Rate
Customer's bill will be calculated by adding the following Customer and MMBtu charges to the amounts
and quantities due under the riders listed below:
Charge Amount
Customer Charge per Meter $ 784.00 per month
Interim Rate Adjustment (“IRA”) $ 1,295.43 per month1
Total Customer Charge $ 2,079.43 per month
First 0 MMBtu to 1,500 MMBtu $ 0.3312 per MMBtu
Next 3,500 MMBtu $ 0.2425 per MMBtu
All MMBtu over 5,000 MMBtu $ 0.0520 per MMBtu
Upstream Transportation Cost Recovery: Plus an amount for upstream transportation costs in
accordance with Part (b) of Rider GCR.
Retention Adjustment: Plus a quantity of gas as calculated in accordance with Rider RA.
Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Imbalance Fees
All fees charged to Customer under this Rate Schedule will be charged based on the quantities determined
under the applicable Transportation Agreement and quantities will not be aggregated for any Customer with
multiple Transportation Agreements for the purposes of such fees.
1 2018 IRA - $155.80, 2019 IRA - $261.93, 2020 IRA - $261.77, 2021 IRA – 309.07, 306.86. 146
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: T – TRANSPORTATION
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Monthly Imbalance Fees
Customer shall pay Company the greater of (i) $0.10 per MMBtu, or (ii) 150% of the difference per MMBtu
between the highest and lowest “midpoint” price for the Katy point listed in Platts Gas Daily in the table
entitled “Daily Price Survey” during such month, for the MMBtu of Customer’s monthly Cumulative
Imbalance, as defined in the applicable Transportation Agreement, at the end of each month that exceeds
10% of Customer’s receipt quantities for the month.
Curtailment Overpull Fee
Upon notification by Company of an event of curtailment or interruption of Customer’s deliveries, Customer
will, for each MMBtu delivered in excess of the stated level of curtailment or interruption, pay Company
200% of the midpoint price for the Katy point listed in Platts Gas Daily published for the applicable Gas Day
in the table entitled “Daily Price Survey.”
Replacement Index
In the event the “midpoint” or “common” price for the Katy point listed in Platts Gas Daily in the table entitled
“Daily Price Survey” is no longer published, Company will calculate the applicable imbalance fees utilizing
a daily price index recognized as authoritative by the natural gas industry and most closely approximating
the applicable index.
Agreement
A transportation agreement is required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having
jurisdiction and to the Company’s Tariff for Gas Service.
Special Conditions
In order to receive service under Rate T, customer must have the type of meter required by Company.
Customer must pay Company all costs associated with the acquisition and installation of the meter.
147
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: T – TRANSPORTATION
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Exhibit A
Cities in the Atmos Texas Municipalities Coalition:
AUSTIN STAR HARBOR
BALCH SPRINGS TRINIDAD
BANDERA WHITNEY
BLOOMING GROVE
BURNET
CAMERON
CEDAR PARK
CLIFTON
COMMERCE
COPPERAS COVE
CORSICANA
ELECTRA
FREDERICKSBURG
GATESVILLE
GOLDTHWAITE
GRANBURY
GREENVILLE
GROESBECK
HAMILTON
HEATH
HENRIETTA
HICKORY CREEK
HICO
HILLSBORO
LAMPASAS
LEANDER
LONGVIEW
MARBLE FALLS
MART
MEXIA
OLNEY
PFLUGERVILLE
POINT
PRINCETON
RANGER
RICE
RIESEL
ROCKDALE
ROGERS
ROUND ROCK
SAN ANGELO
SANGER
SOMERVILLE
148
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: R – RESIDENTIAL SALES
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Deleted: RRC Tariff No: 33012
Deleted: Bills Rendered on or after 07/01/2022
Deleted: PAGE 31
Application
Applicable to Residential Customers for all natural gas provided at one Point of Delivery and measured
through one meter.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
service being furnished.
Monthly Rate
Customer's monthly bill will be calculated by adding the following Customer and Ccf charges to the amounts
due under the riders listed below:
Charge Amount
Customer Charge per Bill $ 18.85 per month
Rider CEE Surcharge $ 0.05 per month1
Interim Rate Adjustment (“IRA”) $ 22.33 per month2
Total Customer Charge $ 41.23 per month
Commodity Charge – All Ccf $0.14846 per Ccf
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated in
accordance with Part (a) and Part (b), respectively, of Rider GCR.
Weather Normalization Adjustment: Plus or Minus an amount for weather normalization calculated
in accordance with Rider WNA.
Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Agreement
An Agreement for Gas Service may be required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having
jurisdiction and to the Company’s Tariff for Gas Service.
1Reference Rider CEE - Conservation and Energy Efficiency as approved in GUD 10170. Surcharge billing effective July 1, 2022.
22018 IRA - $2.84, 2019 IRA - $4.71, 2020 IRA - $4.54, 2021 IRA - $5.15, 2022 IRA - $5.09.
Deleted: 17.24
Deleted:
Deleted: 36.14
149
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: R – RESIDENTIAL SALES
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Deleted: RRC Tariff No: 33012
Deleted: Bills Rendered on or after 10/01/2022
Deleted: PAGE 32
Exhibit A
Cities in the Atmos Texas Municipalities Coalition:
AUSTIN STAR HARBOR
BALCH SPRINGS TRINIDAD
BANDERA WHITNEY
BLOOMING GROVE
BURNET
CAMERON
CEDAR PARK
CLIFTON
COMMERCE
COPPERAS COVE
CORSICANA
ELECTRA
FREDERICKSBURG
GATESVILLE
GOLDTHWAITE
GRANBURY
GREENVILLE
GROESBECK
HAMILTON
HEATH
HENRIETTA
HICKORY CREEK
HICO
HILLSBORO
LAMPASAS
LEANDER
LONGVIEW
MARBLE FALLS
MART
MEXIA
OLNEY
PFLUGERVILLE
POINT
PRINCETON
RANGER
RICE
RIESEL
ROCKDALE
ROGERS
ROUND ROCK
SAN ANGELO
SANGER
SOMERVILLE
150
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: C – COMMERCIAL SALES
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Deleted: RRC Tariff No: 33011
Deleted: Bills Rendered on or after 09/01/2022
Deleted: PAGE 33
Application
Applicable to Commercial Customers for all natural gas provided at one Point of Delivery and measured
through one meter and to Industrial Customers with an average annual usage of less than 30,000 Ccf.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
service being furnished.
Monthly Rate
Customer's monthly bill will be calculated by adding the following Customer and Ccf charges to the amounts
due under the riders listed below:
Charge Amount
Customer Charge per Bill $ 43.50 per month
Rider CEE Surcharge $ (0.01) per month1
Interim Rate Adjustment (“IRA”) $ 70.86 per month2
Total Customer Charge $ 114.35 per month
Commodity Charge – All Ccf $ 0.09165 per Ccf
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated in
accordance with Part (a) and Part (b), respectively, of Rider GCR.
Weather Normalization Adjustment: Plus or Minus an amount for weather normalization calculated
in accordance with Rider WNA.
Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Agreement
An Agreement for Gas Service may be required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having
jurisdiction and to the Company’s Tariff for Gas Service.
Presumption of Plant Protection Level
For service under this Rate Schedule, plant protection volumes are presumed to be 10% of normal, regular,
historical usage as reasonably calculated by the Company in its sole discretion. If a customer believes it
needs to be modeled at an alternative plant protection volume, it should contact the company at
mdtx.plantprotection@atmosenergy.com.
1 Reference Rider CEE - Conservation and Energy Efficiency as approved in GUD 10170. Surcharge billing effective July 1, 2022.
2 2018 IRA - $8.74, 2019 IRA - $14.54, 2020 IRA - $14.48, 2021 IRA - $16.47, 2022 IRA - $16.63.
Deleted: 54.23
Deleted:
Deleted: 97.72
151
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: C – COMMERCIAL SALES
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Deleted: RRC Tariff No: 33011
Deleted: Bills Rendered on or after10/01/2022
Deleted: PAGE 34
Exhibit A
Cities in the Atmos Texas Municipalities Coalition:
AUSTIN STAR HARBOR
BALCH SPRINGS TRINIDAD
BANDERA WHITNEY
BLOOMING GROVE
BURNET
CAMERON
CEDAR PARK
CLIFTON
COMMERCE
COPPERAS COVE
CORSICANA
ELECTRA
FREDERICKSBURG
GATESVILLE
GOLDTHWAITE
GRANBURY
GREENVILLE
GROESBECK
HAMILTON
HEATH
HENRIETTA
HICKORY CREEK
HICO
HILLSBORO
LAMPASAS
LEANDER
LONGVIEW
MARBLE FALLS
MART
MEXIA
OLNEY
PFLUGERVILLE
POINT
PRINCETON
RANGER
RICE
RIESEL
ROCKDALE
ROGERS
ROUND ROCK
SAN ANGELO
SANGER
SOMERVILLE
152
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: I – INDUSTRIAL SALES
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Deleted: RRC Tariff No: 33010
Deleted: Bills Rendered on or after 01/31/2023
Deleted: PAGE 35
Application
Applicable to Industrial Customers with a maximum daily usage (MDU) of less than 200 MMBtu per day for
all natural gas provided at one Point of Delivery and measured through one meter. Service for Industrial
Customers with an MDU equal to or greater than 200 MMBtu per day will be provided at Company's sole
option and will require special contract arrangements between Company and Customer.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
service being furnished.
Monthly Rate
Customer's monthly bill will be calculated by adding the following Customer and MMBtu charges to the
amounts due under the riders listed below:
Charge Amount
Customer Charge per Meter $ 784.00 per month
Interim Rate Adjustment (“IRA”) $ 1,295.43 per month1
Total Customer Charge $ 2,079.43 per month
First 0 MMBtu to 1,500 MMBtu $ 0.3312 per MMBtu
Next 3,500 MMBtu $ 0.2425 per MMBtu
All MMBtu over 5,000 MMBtu $ 0.0520 per MMBtu
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated in
accordance with Part (a) and Part (b), respectively, of Rider GCR.
Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Curtailment Overpull Fee
Upon notification by Company of an event of curtailment or interruption of Customer’s deliveries, Customer
will, for each MMBtu delivered in excess of the stated level of curtailment or interruption, pay Company
200% of the midpoint price for the Katy point listed in Platts Gas Daily published for the applicable Gas Day
in the table entitled “Daily Price Survey.”
1 2018 IRA - $155.80, 2019 IRA - $261.93, 2020 IRA - $261.77, 2021 IRA - $309.07, 2022 IRA - $306.86.
Deleted: 988.57
Deleted: 1,772.57
153
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: I – INDUSTRIAL SALES
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Deleted: RRC Tariff No: 33010
Deleted: Bills Rendered on or after 01/31/2023
Deleted: PAGE 36
Replacement Index
In the event the “midpoint” or “common” price for the Katy point listed in Platts Gas Daily in the table entitled
“Daily Price Survey” is no longer published, Company will calculate the applicable imbalance fees utilizing
a daily price index recognized as authoritative by the natural gas industry and most closely approximating
the applicable index.
Agreement
An Agreement for Gas Service may be required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having
jurisdiction and to the Company’s Tariff for Gas Service.
Special Conditions
In order to receive service under Rate I, Customer must have the type of meter required by Company.
Customer must pay Company all costs associated with the acquisition and installation of the meter.
Presumption of Plant Protection Level
For service under this Rate Schedule, plant protection volumes are presumed to be 10% of normal, regular,
historical usage as reasonably calculated by the Company in its sole discretion. If a customer believes it
needs to be modeled at an alternative plant protection volume, it should contact the company at
mdtx.plantprotection@atmosenergy.com.
154
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: I – INDUSTRIAL SALES
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Deleted: RRC Tariff No: 33010
Deleted: Bills Rendered on or after 01/31/2023
Deleted: PAGE 37
Exhibit A
Cities in the Atmos Texas Municipalities Coalition:
AUSTIN STAR HARBOR
BALCH SPRINGS TRINIDAD
BANDERA WHITNEY
BLOOMING GROVE
BURNET
CAMERON
CEDAR PARK
CLIFTON
COMMERCE
COPPERAS COVE
CORSICANA
ELECTRA
FREDERICKSBURG
GATESVILLE
GOLDTHWAITE
GRANBURY
GREENVILLE
GROESBECK
HAMILTON
HEATH
HENRIETTA
HICKORY CREEK
HICO
HILLSBORO
LAMPASAS
LEANDER
LONGVIEW
MARBLE FALLS
MART
MEXIA
OLNEY
PFLUGERVILLE
POINT
PRINCETON
RANGER
RICE
RIESEL
ROCKDALE
ROGERS
ROUND ROCK
SAN ANGELO
SANGER
SOMERVILLE
155
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: T – TRANSPORTATION
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Deleted: RRC Tariff No: 33009
Deleted: Bills Rendered on or after 06/10/2022
Deleted: PAGE 38
Application
Applicable, in the event that Company has entered into a Transportation Agreement, to a customer directly
connected to the Atmos Energy Corp., Mid-Tex Division Distribution System (Customer) for the
transportation of all natural gas supplied by Customer or Customer’s agent at one Point of Delivery for use
in Customer's facility.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
service being furnished.
Monthly Rate
Customer's bill will be calculated by adding the following Customer and MMBtu charges to the amounts
and quantities due under the riders listed below:
Charge Amount
Customer Charge per Meter $ 784.00 per month
Interim Rate Adjustment (“IRA”) $ 1,295.43 per month1
Total Customer Charge $ 2,079.43 per month
First 0 MMBtu to 1,500 MMBtu $ 0.3312 per MMBtu
Next 3,500 MMBtu $ 0.2425 per MMBtu
All MMBtu over 5,000 MMBtu $ 0.0520 per MMBtu
Upstream Transportation Cost Recovery: Plus an amount for upstream transportation costs in
accordance with Part (b) of Rider GCR.
Retention Adjustment: Plus a quantity of gas as calculated in accordance with Rider RA.
Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Imbalance Fees
All fees charged to Customer under this Rate Schedule will be charged based on the quantities determined
under the applicable Transportation Agreement and quantities will not be aggregated for any Customer with
multiple Transportation Agreements for the purposes of such fees.
1 2018 IRA - $155.80, 2019 IRA - $261.93, 2020 IRA - $261.77, 2021 IRA – 309.07, 306.86.
Deleted: 988.57
Deleted: 1,772.57
156
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: T – TRANSPORTATION
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Deleted: RRC Tariff No: 33009
Deleted: Bills Rendered on or after 06/10/2022
Deleted: PAGE 39
Monthly Imbalance Fees
Customer shall pay Company the greater of (i) $0.10 per MMBtu, or (ii) 150% of the difference per MMBtu
between the highest and lowest “midpoint” price for the Katy point listed in Platts Gas Daily in the table
entitled “Daily Price Survey” during such month, for the MMBtu of Customer’s monthly Cumulative
Imbalance, as defined in the applicable Transportation Agreement, at the end of each month that exceeds
10% of Customer’s receipt quantities for the month.
Curtailment Overpull Fee
Upon notification by Company of an event of curtailment or interruption of Customer’s deliveries, Customer
will, for each MMBtu delivered in excess of the stated level of curtailment or interruption, pay Company
200% of the midpoint price for the Katy point listed in Platts Gas Daily published for the applicable Gas Day
in the table entitled “Daily Price Survey.”
Replacement Index
In the event the “midpoint” or “common” price for the Katy point listed in Platts Gas Daily in the table entitled
“Daily Price Survey” is no longer published, Company will calculate the applicable imbalance fees utilizing
a daily price index recognized as authoritative by the natural gas industry and most closely approximating
the applicable index.
Agreement
A transportation agreement is required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having
jurisdiction and to the Company’s Tariff for Gas Service.
Special Conditions
In order to receive service under Rate T, customer must have the type of meter required by Company.
Customer must pay Company all costs associated with the acquisition and installation of the meter.
157
Item 10.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: T – TRANSPORTATION
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION IN THE ATMOS TEXAS
MUNICIPALITIES COALITION (“ATM”)
EFFECTIVE DATE:
Deleted: RRC Tariff No: 33009
Deleted: Bills Rendered on or after 10/01/2022
Deleted: PAGE 40
Exhibit A
Cities in the Atmos Texas Municipalities Coalition:
AUSTIN STAR HARBOR
BALCH SPRINGS TRINIDAD
BANDERA WHITNEY
BLOOMING GROVE
BURNET
CAMERON
CEDAR PARK
CLIFTON
COMMERCE
COPPERAS COVE
CORSICANA
ELECTRA
FREDERICKSBURG
GATESVILLE
GOLDTHWAITE
GRANBURY
GREENVILLE
GROESBECK
HAMILTON
HEATH
HENRIETTA
HICKORY CREEK
HICO
HILLSBORO
LAMPASAS
LEANDER
LONGVIEW
MARBLE FALLS
MART
MEXIA
OLNEY
PFLUGERVILLE
POINT
PRINCETON
RANGER
RICE
RIESEL
ROCKDALE
ROGERS
ROUND ROCK
SAN ANGELO
SANGER
SOMERVILLE
158
Item 10.
Line
No.Rate Class Current* Proposed Difference % Change
(a) (b) (c) (d) (e) (f)
10
11 Residential Tariff (Rate R)
12 Customer Charge per Bill 36.14$ 41.23$ 5.09$ 14.08%
13 Consumption Charge (Ccf) 0.14846$ 0.14846$ -$ 0.00%
14 Average Monthly Bill @ 34.6 Ccf 77.05$ 82.14$ 5.09$ 6.61%
15
16 Commercial Tariff (Rate C)
17 Customer Charge per Bill 97.72$ 114.35$ 16.63$ 17.02%
18 Consumption Charge (Ccf) 0.09165$ 0.09165$ -$ 0.00%
19 Average Monthly Bill @ 272.3 Ccf 373.77$ 390.40$ 16.63$ 4.45%
20
21 Industrial Tariff (Rate I)
22 Customer Charge per Meter 1,772.57$ 2,079.43$ 306.86$ 17.31%
23 First 1,500 MMBtu 0.3312$ 0.3312$ -$ 0.00%
24 Next 3,500 MMBtu 0.2425$ 0.2425$ -$ 0.00%
25 Over 5,000 MMBtu 0.0520$ 0.0520$ -$ 0.00%
26 Average Monthly Bill @ 4,113.8 MMBtu 30,662.19$ 30,969.05$ 306.86$ 1.00%
27
28 Transportation Tariff (Rate T)
29 Customer Charge per Meter 1,772.57$ 2,079.43$ 306.86$ 17.31%
30 First 1,500 MMBtu 0.3312$ 0.3312$ -$ 0.00%
31 Next 3,500 MMBtu 0.2425$ 0.2425$ -$ 0.00%
32 Over 5,000 MMBtu 0.0520$ 0.0520$ -$ 0.00%
33 Average Monthly Bill @ 4,113.8 MMBtu 4,810.83$ 5,117.69$ 306.86$ 6.38%
34
35
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Bill Comparisons
Current and Proposed Bill Information - With Gas Cost
IRA-4 Bill Comparisons Page 1 of 2
159
Item 10.
Line
No.Rate Class Current* Proposed Difference % Change
(a) (b) (c) (d) (e) (f)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Bill Comparisons
36
37 Residential Tariff (Rate R)
38 Customer Charge per Bill 36.14$ 41.23$ 5.09$ 14.08%
39 Consumption Charge (Ccf) 0.14846$ 0.14846$ -$ 0.00%
40 Average Monthly Bill @ 34.6 Ccf 41.28$ 46.37$ 5.09$ 12.33%
41
42 Commercial Tariff (Rate C)
43 Customer Charge per Bill 97.72$ 114.35$ 16.63$ 17.02%
44 Consumption Charge (Ccf) 0.09165$ 0.09165$ -$ 0.00%
45 Average Monthly Bill @ 272.3 Ccf 122.68$ 139.31$ 16.63$ 13.56%
46
47 Industrial Tariff (Rate I)
48 Customer Charge per Meter 1,772.57$ 2,079.43$ 306.86$ 17.31%
49 First 1,500 MMBtu 0.3312$ 0.3312$ -$ 0.00%
50 Next 3,500 MMBtu 0.2425$ 0.2425$ -$ 0.00%
51 Over 5,000 MMBtu 0.0520$ 0.0520$ -$ 0.00%
52 Average Monthly Bill @ 4,113.8 MMBtu 2,903.22$ 3,210.08$ 306.86$ 10.57%
53
54 Transportation Tariff (Rate T)
55 Customer Charge per Meter 1,772.57$ 2,079.43$ 306.86$ 17.31%
56 First 1,500 MMBtu 0.3312$ 0.3312$ -$ 0.00%
57 Next 3,500 MMBtu 0.2425$ 0.2425$ -$ 0.00%
58 Over 5,000 MMBtu 0.0520$ 0.0520$ -$ 0.00%
59 Average Monthly Bill @ 4,113.8 MMBtu 2,903.22$ 3,210.08$ 306.86$ 10.57%
60
61 Note:
62 *Current rates - Please see IRA-1 General Information, No. 14.
Current and Proposed Bill Information - Without Gas Cost
IRA-4 Bill Comparisons Page 2 of 2
160
Item 10.
Line
No. Description Ref
As per GUD No. 10779
At 12/31/21 (1)
Per Book As of
12/31/2022 Adjustments
Per Book Adjusted
As of 12/31/2022
Change in
Investment
(a) (b) (c) (d) (e) (f) = (g) - (e) (g) (h) = (g) - (d)
11 Direct Utility Plant Investment 7,559,007,901$ 8,489,069,333$ 39,340,362$ 8,528,409,695$ 969,401,794$
12 Direct Accumulated Depreciation 1,534,215,140 1,725,907,746 (77,920,089) 1,647,987,657 113,772,518
13 Allocated Utility Plant Investment (If applicable) 163,993,774 175,185,343 (2,967,706) 172,217,636 8,223,862
14 Allocated Accumulated Depreciation (If applicable) 76,093,289 87,337,936 (892,745) 86,445,190 10,351,902
15 Miscellaneous Adjustments (20,707,171) (21,912,242) (21,912,242) (1,205,072)
16 Net Utility Plant Investment (Ln 11 - 12 + 13 - 14 + 15) 6,091,986,077$ 6,851,008,994$ 93,273,247$ 6,944,282,241$ 852,296,165$
17
18 Calculation of the Interim Rate Adjustment Amount:
19 Rate of Return IRA-1 7.97%
20 Return Col (h), Ln 16 times Col (h), Ln 19 67,902,435$
21 Depreciation Expense IRA-8 plus IRA-11 27,788,833
22 Property-related Taxes (Ad Valorem) IRA-21 19,642,659
23 Revenue-related Taxes and State Margin Tax 2 -
24 Federal Income Tax IRA-20 13,362,493
25 Interim Rate Adjustment Amount (Sum of Ln 20 through Ln 24)128,696,421$
26
27 Interim Rate Adjustment Amount per Rate Class:
Allocation Factors
per GUD No. 10779: Total Service Area: ATM Jurisdiction:
28 Rate Schedule R 77.95% 100,323,345$ 10,321,237$
29 Rate Schedule C 19.40% 24,966,931 2,205,737
30 Rate Schedule I and T 2.65% 3,406,146 298,268
31 Total (Sum of Ln 28 through Ln 30)100.00% 128,696,421$ 12,825,242$
32
33 Monthly Customer Charge Adjustment:
Annual Service Area
Bill Count:
Annual ATM
Jurisdiction
Bill Count:
Monthly Customer
Charge Adjustment:
34 Rate Schedule R 19,691,520 2,027,748 5.09$
35 Rate Schedule C 1,501,536 132,636 16.63$
36 Rate Schedule I and T 11,100 972 306.86$
37 Total (Sum of Ln 34 through Ln 36)21,204,156 2,161,356
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Interim Rate Adjustment Summary
IRA-5 IRA Summary Page 1 of 2 161
Item 10.
Line
No. Description Ref
As per GUD No. 10779
At 12/31/21 (1)
Per Book As of
12/31/2022 Adjustments
Per Book Adjusted
As of 12/31/2022
Change in
Investment
(a) (b) (c) (d) (e) (f) = (g) - (e) (g) (h) = (g) - (d)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Interim Rate Adjustment Summary
38 - OR -
39 Monthly Initial Block Rate Adjustment:
Annual Service Area
Volumes:
Annual ATM
Jurisdiction
Volumes:
Monthly Initial Block
Rate Adjustment:
40 Rate Schedule R N/A N/A N/A
41 Rate Schedule C N/A N/A N/A
42 Rate Schedule I and T N/A N/A N/A
43
44
Current
Customer Charge
Other
Adjustments
Current Year IRA
Adjustment
Proposed
Customer Charge
45 Change to Customer Charge 3
46 Rate Schedule R 18.85$ 17.29$ 5.09$ 41.23$
47 Rate Schedule C 43.50$ 54.22$ 16.63$ 114.35$
48 Rate Schedule I and T 784.00$ 988.57$ 306.86$ 2,079.43$
49
50 Notes:
51 1. The amounts are updated as per GUD No. 10779 Final Order.
52 2. Revenue related taxes are collected through Rider FF and Rider TAX.
53 3. Column (d) is from GUD No. 10779, Final Order, Finding of Fact 47. Column (e) encompasses the Rider CEE Tariff per the Compliance Filing (2021-2022 CEE Program Report), the Mid-Tex
ATM IRA Filing (2018, 2019, 2020, and 2021).
IRA-5 IRA Summary Page 2 of 2 162
Item 10.
Line No. Description
Prior Year
Allocation Factors (1)
Current Year
Allocation Factors (2) Amounts or Factors
(a) (b) (c) (d) (e)
10 SSU General Office (Division 002) 40.26% 40.09%
11
12 SSU General Office - Greenville Data Center 14.16% 14.18%
13
14 SSU General Office - Distribution and Marketing 50.74% 51.13%
15
16 SSU General Office - Aligne Pipe Projects 5.89% 6.13%
17
18 SSU Customer Support (Division 012) 52.74% 53.00%
19
20 SSU Customer Support - Charles K. Vaughn Training Center 75.72% 71.83%
21
22
23 Weighted Average Cost of Capital Table (3):Capital Structure Cost Weighted Cost
24 (b)(c) (d) (e) = (c) * (d)
25
26 Common Equity 60.18% 9.80% 5.90%
27 Debt 39.82% 5.20% 2.07%
28 Total 100.00% 7.97%
29
30
31 Return Factor - GUD No. 10779 Final Order, Sch. G, Col (b), Ln 20 7.97%
32
33
34 Federal Income Tax Factor Calculation ((1 / .79) * (.21)) (4)26.58%
35
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocation Factors
IRA-5A Allocation Factors Page 1 of 2
163
Item 10.
Line No. Description
Prior Year
Allocation Factors (1)
Current Year
Allocation Factors (2) Amounts or Factors
(a) (b) (c) (d) (e)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocation Factors
36 Allocation Factors:
37 Rate Schedule R GUD No. 10779 Final Order, Finding of Fact 46 (f) 77.95%
38 Rate Schedule C GUD No. 10779 Final Order, Finding of Fact 46 (f) 19.40%
39 Rate Schedule I and T GUD No. 10779 Final Order, Finding of Fact 46 (f) 2.65%
40 Total Sum of Ln 37 through Ln 39 100.00%
41
42 2022 Year-end Number of Customers (Rate R and C) / Number of Meters (Rate I and T) times 12: (5)
43 Rate Schedule R 19,691,520
44 Rate Schedule C 1,501,536
45 Rate Schedule I and T 11,100
46 Total Sum of Ln 43 through Ln 45 21,204,156
47
48 Notes:
49 1. The allocation factors above are for Fiscal Year 2022 and based on the 4-factor formula.
50 2. The allocation factors above are for Fiscal Year 2023 and based on the 4-factor formula.
51 3. Capital Structure and Cost Components are per GUD No. 10779, Final Order, Finding of Facts 42 through 45.
52 4. The Federal Income Tax rate of 21% as per GUD No. 10779, Final Order, Finding of Fact 46 (e).
53 5. Utilizing the current year number of customers or meters is per the methodology in GUD No. 9560 Final Order, Finding of Fact 49.
IRA-5A Allocation Factors Page 2 of 2
164
Item 10.
Line
No. Description Ref Adjustments
Total
Adjustments
(a) (b) (c) (d) (e)
11 GUD No. 10779 Miscellaneous Adjustments:
12 To remove the Rate Base Adjustments as of December 31, 2017 per the Final Order, Exhibit B, Page 4 of 4, Ln 8. 1 (11,532,315)$
13 Ending Balance, 2017 Miscellaneous Adjustments (11,532,315)$
14
15 2018 Miscellaneous Adjustments:
16 To reverse the Amortized Rate Base Adjustments as of December 31, 2017.1 11,532,315$
17 To remove the Amortized Rate Base Adjustments as of December 31, 2018.1 (11,018,187)
18 To remove CY2018 Employee Expense Account Charges from Mid-Tex and SSU 2018 Additions.2 (113,619)
19 To remove CY2018 Employee Related Expenses found through the 5400 subaccount review.3 (132,799)
20 To remove CY2018 Employee Related Expenses found through the 900 account review.3 (109,090)
21 To remove CY2018 Incentive Compensation (SSU MIP/VPP and LTIP).4 (4,635,624)
22 To remove CY2018 Severance Pay in order to reduce controversy. 6 -
23 Ending Balance, 2018 Miscellaneous Adjustments (4,477,004)$
24
25 2019 Miscellaneous Adjustments:
26 To reverse the Amortized Rate Base Adjustments as of December 31, 2018.1 11,018,187$
27 To remove the Amortized Rate Base Adjustments as of December 31, 2019.1 (10,504,060)
28 To remove CY2019 Employee Expense Account Charges from Mid-Tex and SSU 2019 Additions.2 (65,054)
29 To remove CY2019 Employee Related Expenses found through the 5400 subaccount review.3 (31,275)
30 To remove CY2019 Employee Related Expenses found through the 900 account review.3 82,198
31 To remove CY2019 Incentive Compensation (FY19 Proxy Statement Named Executive Officers).5 (2,382,433)
32 To remove CY2019 Severance Pay in order to reduce controversy. 6 (68,713)
33 Ending Balance, 2019 Miscellaneous Adjustments (1,951,149)$
34
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Miscellaneous Adjustments
IRA-5B Misc Adjustments
Page 1 of 3 165
Item 10.
Line
No. Description Ref Adjustments
Total
Adjustments
(a) (b) (c) (d) (e)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Miscellaneous Adjustments
35 2020 Miscellaneous Adjustments:
36 To reverse the Amortized Rate Base Adjustments as of December 31, 2019.1 10,504,060$
37 To remove the Amortized Rate Base Adjustments as of December 31, 2020.1 (9,989,932)
38 To remove CY2020 Employee Expense Account Charges from Mid-Tex and SSU 2020 Additions.2 (18,824)
39 To remove CY2020 Employee Related Expenses found through the 5400 subaccount review.3 (32,158)
40 To remove CY2020 Employee Related Expenses found through the 900 account review.3 (13,478)
41 To remove CY2020 Incentive Compensation (FY20 Named Executive Officers).5 (1,992,281)
42 To remove CY2020 Severance Pay in order to reduce controversy. 6 (66,560)
43 Ending Balance, 2020 Miscellaneous Adjustments (1,609,173)$
44
45 2021 Miscellaneous Adjustments:
46 To reverse the Amortized Rate Base Adjustments as of December 31, 2020.1 9,989,932$
47 To remove the Amortized Rate Base Adjustments as of December 31, 2021.1 (9,475,804)
48 To remove CY2021 Employee Expense Account Charges from Mid-Tex and SSU 2021 Additions.2 (12,850)
49 To remove CY2021 Employee Related Expenses found through the 5400 subaccount review.3 (4,920)
50 To remove CY2021 Employee Related Expenses found through the 900 account review.3 (10,153)
51 To remove CY2021 Incentive Compensation (FY21 Named Executive Officers).5 (1,613,491)
52 To remove CY2021 Severance Pay in order to reduce controversy. 6 (10,244)
53 Ending Balance, 2021 Miscellaneous Adjustments (1,137,530)$
54
55 Total Miscellaneous Adjustments as of December 31, 2020 (IRA-5, Col (d), Ln 15)(20,707,171)$
56
57 2022 Miscellaneous Adjustments:
58 To reverse the Amortized Rate Base Adjustments as of December 31, 2021.1 9,475,804$
59 To remove the Amortized Rate Base Adjustments as of December 31, 2022.1 (8,961,677)
60 To remove CY2022 Employee Expense Account Charges from Mid-Tex and SSU 2022 Additions.2 (28,649)
61 To remove CY2022 Employee Related Expenses found through the 5400 subaccount review.3 (32,610)
62 To remove CY2022 Employee Related Expenses found through the 900 account review.3 (9,373)
63 To remove CY2022 Incentive Compensation (FY22 Named Executive Officers).5 (1,647,197)
64 To remove CY2022 Severance Pay in order to reduce controversy. 6 (1,370)
65 Ending Balance, 2022 Miscellaneous Adjustments (1,205,072)$
66
67 Total Miscellaneous Adjustments as of December 31, 2021 (IRA-5, Col (g), Ln 15)(21,912,242)$
IRA-5B Misc Adjustments
Page 2 of 3 166
Item 10.
Line
No. Description Ref Adjustments
Total
Adjustments
(a) (b) (c) (d) (e)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Miscellaneous Adjustments
68
69 Notes:
70 1. This adjustment rolls forward the balances disallowed in GUD Nos. 9670, 9762, 9869, 10170, and 10779 Final Orders.
71 2. This adjustment removes the capital amounts of certain employee expense account charges.
72 3. This adjustment removes the capital amounts of other employee related expenses.
73 4. This adjustment removes the capital amounts associated with SSU MIP/VPP and LTIP per GUD No. 10779.
74
75 6. This adjustment removes the capital portion of severance pay. There was no severance pay during CY2018.
5. This adjustment removes the capital incentive compensation amounts associated with the Company's named executive officers per TEX. UTIL. CODE §
IRA-5B Misc Adjustments
Page 3 of 3 167
Item 10.
Line
No.
FERC
Account No. FERC Account Titles Ref
Prior Year Adjusted
Gross Plant @
12/31/21
Depreciation
Rate per
GUD No. 10779
Depreciation
Expense
Adjusted
Accumulated
Depreciation
@ 12/31/21 Net Plant
(a) (b) (c) (d) (e) (f) (g) (h) (i) = (e) - (h)
11 1. INTANGIBLE PLANT
12 301.00 Organization -$ 0.00% -$ -$ -$
13 302.00 Franchises and Consents 18,896 0.00% - 7,231 11,665
14 303.00 Miscellaneous Intangible Plant 709,231 0.00% - 797,603 (88,372)
15 Subtotal 728,128$ -$ 804,834$ (76,707)$
16
17 5. DISTRIBUTION PLANT
18 374.01 Land 990,029$ 0.00% -$ 7,827$ 982,203$
19 374.02 Land Rights 3,446,318 0.98% 33,774 1,635,206 1,811,112
20 375.00 Structures and Improvements 1,759,128 1.71% 30,081 1,114,574 644,554
21 376.00 Mains - Cathodic Protection 156,793,055 1.85% 2,900,672 41,241,624 115,551,431
22 376.01 Mains - Steel 935,258,740 3.97% 37,129,772 138,789,124 796,469,616
23 376.02 Mains - Plastic 3,372,585,466 2.21% 74,534,139 600,952,157 2,771,633,309
24 378.00 M&R Station Equipment 170,906,108 3.09% 5,280,999 36,095,607 134,810,501
25 379.00 City Gate Equipment 6,739,697 1.88% 126,706 3,652,485 3,087,212
26 380.00 Services 2,064,988,375 3.67% 75,785,073 526,885,024 1,538,103,351
27 381.00 Meters 392,724,784 3.31% 12,999,190 74,440,982 318,283,802
28 382.00 Meter Installations 211,758,624 3.66% 7,750,366 42,089,787 169,668,838
29 383.00 House Regulators 102,697,080 3.50% 3,594,398 26,740,761 75,956,319
30 385.00 Industrial M&R Station Equipment 3,246,617 2.80% 90,905 648,319 2,598,298
31 Subtotal 7,423,894,021$ 220,256,075$ 1,494,293,476$ 5,929,600,544$
32
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Direct Initial or Prior Year Plant
IRA-6 Direct Initial Plant Page 1 of 3 168
Item 10.
Line
No.
FERC
Account No. FERC Account Titles Ref
Prior Year Adjusted
Gross Plant @
12/31/21
Depreciation
Rate per
GUD No. 10779
Depreciation
Expense
Adjusted
Accumulated
Depreciation
@ 12/31/21 Net Plant
(a) (b) (c) (d) (e) (f) (g) (h) (i) = (e) - (h)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Direct Initial or Prior Year Plant
33 6. GENERAL PLANT
34 389.00 Land and Land Rights 5,141,158$ 0.00% -$ 114$ 5,141,045$
35 390.00 Structures and Improvements 62,512,912 2.54% 1,587,828 21,268,007 41,244,904
36 390.04 Air Conditioning Equipment 488,803 2.75% 13,442 90,189 398,614
37 391.00 Office Furniture and Equipment 8,573,613 4.00% 342,945 (1,165,461) 9,739,074
38 392.00 Transportation Equipment 1 740,485 9.04% 6,859 484,233 256,252
39 393.00 Stores Equipment 1 128,968 4.00% 529 41,858 87,110
40 394.00 Tools, Shop, and Garage Equipment 1 33,349,384 5.00% 171,060 12,306,698 21,042,686
41 395.00 Laboratory Equipment 1 1,507,308 10.00% 15,545 368,309 1,138,999
42 396.00 Power Operated Equipment 1 1,584,794 7.24% 2,295 724,554 860,240
43 397.00 Communication Equipment 2,362,192 6.67% 157,558 1,825,699 536,493
44 398.00 Miscellaneous Equipment 2,247,428 2.50% 56,186 1,360,222 887,206
45 399.00 Other Tangible Property 215,142 14.29% 30,744 173,732 41,410
46 399.01 Other Tangible Property - Servers Hardware 2 67,905 14.29% - 67,905 -
47 399.02 Other Tangible Property - Servers Software 245,306 14.29% 35,054 208,823 36,483
48 399.03 Other Tangible Property - Network Hardware 1,320,491 11.11% 146,707 760,346 560,144
49 399.06 Other Tangible Property - PC Hardware 12,465,036 14.29% 1,781,254 7,265,173 5,199,864
50 399.07 Other Tangible Property - PC Software 405,509 14.29% 57,947 138,202 267,307
51 399.08 Other Tangible Property - Application Software 1,029,321 14.29% 147,090 297,781 731,540
52 RWIP Retirement Work In Progress - 0.00% - (7,099,552) 7,099,552
53 Subtotal 134,385,753$ 4,553,042$ 39,116,829$ 95,268,923$
54
55 TOTAL 7,559,007,901$ 224,809,117$ 1,534,215,140$ 6,024,792,761$
56 Accrual for Reserve Deficiency (AR 15) - 167,842 - -
57 Adjusted Total 7,559,007,901$ 224,976,959$ 1,534,215,140$ 6,024,792,761$
58
IRA-6 Direct Initial Plant Page 2 of 3 169
Item 10.
Line
No.
FERC
Account No. FERC Account Titles Ref
Prior Year Adjusted
Gross Plant @
12/31/21
Depreciation
Rate per
GUD No. 10779
Depreciation
Expense
Adjusted
Accumulated
Depreciation
@ 12/31/21 Net Plant
(a) (b) (c) (d) (e) (f) (g) (h) (i) = (e) - (h)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Direct Initial or Prior Year Plant
59 Notes:
60 1. The following accounts have a portion of their depreciation expense capitalized to projects:
61 Account Numbers Cap Percentage
62 392 89.75%
63 393 89.74%
64 394 89.74%
65 395 89.69%
66 396 98.00%
67 2. Depreciation expense was not calculated, since the account is fully depreciated.
IRA-6 Direct Initial Plant Page 3 of 3 170
Item 10.
Line
No.
FERC
Account No. FERC Account Titles Ref
Adjusted Gross
Plant As of
12/31/22
Depreciation
Rate per
GUD No. 10779
Depreciation
Expense
Adjusted
Accumulated
Depreciation As of
12/31/22 Net Plant
(a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h)
11 1. INTANGIBLE PLANT
12 301.00 Organization -$ 0.00% -$ -$ -$
13 302.00 Franchises and Consents 18,896 0.00% - 7,231 11,665
14 303.00 Miscellaneous Intangible Plant 709,231 0.00% - 797,603 (88,372)
15 Subtotal 728,128$ -$ 804,834$ (76,707)$
16
17 5. DISTRIBUTION PLANT
18 374.01 Land 990,029$ 0.00% -$ 7,827$ 982,203$
19 374.02 Land Rights 3,446,318 0.98% 33,774 1,668,980 1,777,338
20 375.00 Structures and Improvements 1,764,181 1.71% 30,167 1,144,720 619,461
21 376.00 Mains - Cathodic Protection 175,736,711 1.85% 3,251,129 44,110,823 131,625,888
22 376.01 Mains - Steel 992,118,941 3.97% 39,387,122 132,321,040 859,797,901
23 376.02 Mains - Plastic 3,919,042,368 2.21% 86,610,836 668,660,102 3,250,382,266
24 378.00 M&R Station Equipment 189,341,688 3.09% 5,850,658 29,637,964 159,703,724
25 379.00 City Gate Equipment 6,966,029 1.88% 130,961 3,780,363 3,185,666
26 380.00 Services 2,317,761,182 3.67% 85,061,835 581,469,199 1,736,291,983
27 381.00 Meters 415,270,990 3.31% 13,745,470 76,688,442 338,582,548
28 382.00 Meter Installations 266,654,582 3.66% 9,759,558 45,328,223 221,326,359
29 383.00 House Regulators 100,979,508 3.50% 3,534,283 27,642,019 73,337,489
30 385.00 Industrial M&R Station Equipment 3,570,801 2.80% 99,982 741,436 2,829,365
31 Subtotal 8,393,643,328$ 247,495,776$ 1,613,201,138$ 6,780,442,190$
32
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Direct Current Year Plant (Adjusted)
IRA-7 Direct Current Plant Page 1 of 3 171
Item 10.
Line
No.
FERC
Account No. FERC Account Titles Ref
Adjusted Gross
Plant As of
12/31/22
Depreciation
Rate per
GUD No. 10779
Depreciation
Expense
Adjusted
Accumulated
Depreciation As of
12/31/22 Net Plant
(a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Direct Current Year Plant (Adjusted)
33 6. GENERAL PLANT
34 389.00 Land and Land Rights 5,006,336$ 0.00% -$ (2,881)$ 5,009,217$
35 390.00 Structures and Improvements 64,532,196 2.54% 1,639,118 20,332,706 44,199,490
36 390.04 Air Conditioning Equipment 559,367 2.75% 15,383 103,817 455,551
37 391.00 Office Furniture and Equipment 7,582,308 4.00% 303,292 (1,906,126) 9,488,433
38 392.00 Transportation Equipment 1 394,966 9.04% 3,928 335,428 59,538
39 393.00 Stores Equipment 1 128,968 4.00% 567 47,195 81,773
40 394.00 Tools, Shop, and Garage Equipment 1 33,392,717 5.00% 183,660 11,559,860 21,832,857
41 395.00 Laboratory Equipment 1 1,163,017 10.00% 12,793 197,154 965,863
42 396.00 Power Operated Equipment 1 1,584,794 7.24% 2,295 839,293 745,501
43 397.00 Communication Equipment 2,362,192 6.67% 157,558 1,993,181 369,011
44 398.00 Miscellaneous Equipment 2,291,203 2.50% 57,280 1,505,208 785,995
45 399.00 Other Tangible Property 185,229 14.29% 26,469 171,356 13,873
46 399.01 Other Tangible Property - Servers Hardware 2 4,377 14.29% - 4,377 -
47 399.02 Other Tangible Property - Servers Software 237,611 14.29% 33,955 235,812 1,800
48 399.03 Other Tangible Property - Network Hardware 1,561,636 11.11% 173,498 792,249 769,387
49 399.06 Other Tangible Property - PC Hardware 11,829,430 14.29% 1,690,426 6,365,203 5,464,228
50 399.07 Other Tangible Property - PC Software 396,293 14.29% 56,630 188,380 207,913
51 399.08 Other Tangible Property - Application Software 825,602 14.29% 117,979 238,592 587,009
52 RWIP Retirement Work In Progress - - (9,019,115) 9,019,115
53 Subtotal 134,038,240$ 4,474,830$ 33,981,686$ 100,056,554$
54
55 TOTAL 8,528,409,695$ 251,970,606$ 1,647,987,657$ 6,880,422,037$
56 Accrual for Reserve Deficiency (AR 15) - 167,124 - -
57 Adjusted Total 8,528,409,695$ 252,137,730$ 1,647,987,657$ 6,880,422,037$
58
IRA-7 Direct Current Plant Page 2 of 3 172
Item 10.
Line
No.
FERC
Account No. FERC Account Titles Ref
Adjusted Gross
Plant As of
12/31/22
Depreciation
Rate per
GUD No. 10779
Depreciation
Expense
Adjusted
Accumulated
Depreciation As of
12/31/22 Net Plant
(a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Direct Current Year Plant (Adjusted)
59 Notes:
60 1. The following accounts have a portion of their depreciation expense capitalized to projects:
61 Account Numbers Cap Percentage
62 392 89.00%
63 393 89.00%
64 394 89.00%
65 395 89.00%
66 396 98.00%
67 2. Depreciation expense was not calculated, since the account is fully depreciated.
IRA-7 Direct Current Plant Page 3 of 3 173
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Per Book Gross
Plant As of
12/31/22
Plant
Adjustments
Adjusted Gross
Plant as of
12/31/22
Per Book
Accumulated
Depreciation As
of 12/31/22
Accumulated
Depreciation
Adjustments
Adjusted
Accumulated
Depreciation as
of 12/31/22
(a) (b) (c) (d) (e) (f) (g) = (e) - (f) (h) (i) (j) = (h) - (i)
11 1. INTANGIBLE PLANT
12 301.00 Organization -$ -$ -$ -$ -$ -$
13 302.00 Franchises and Consents 18,896 - 18,896 7,231 - 7,231
14 303.00 Miscellaneous Intangible Plant 921,324 212,093 709,231 921,324 123,721 797,603
15 Subtotal 940,220$ 212,093$ 728,128$ 928,555$ 123,721$ 804,834$
16
17 5. DISTRIBUTION PLANT
18 374.01 Land 990,029$ -$ 990,029$ 7,827$ -$ 7,827$
19 374.02 Land Rights 3,446,318 - 3,446,318 1,668,980 - 1,668,980
20 375.00 Structures and Improvements 1,764,181 - 1,764,181 1,144,720 - 1,144,720
21 376.00 Mains - Cathodic Protection 224,024,163 48,287,452 175,736,711 87,063,938 42,953,115 44,110,823
22 376.01 Mains - Steel 974,888,257 (17,230,684) 992,118,941 132,321,776 736 132,321,040
23 376.02 Mains - Plastic 3,850,067,754 (68,974,614) 3,919,042,368 668,903,673 243,572 668,660,102
24 378.00 M&R Station Equipment 186,664,335 (2,677,353) 189,341,688 29,637,964 - 29,637,964
25 379.00 City Gate Equipment 6,931,765 (34,264) 6,966,029 3,780,363 - 3,780,363
26 380.00 Services 2,325,626,467 7,865,285 2,317,761,182 616,028,007 34,558,807 581,469,199
27 381.00 Meters 411,964,184 (3,306,806) 415,270,990 76,688,442 - 76,688,442
28 382.00 Meter Installations 263,770,790 (2,883,792) 266,654,582 45,329,417 1,195 45,328,223
29 383.00 House Regulators 100,327,752 (651,755) 100,979,508 27,642,131 112 27,642,019
30 385.00 Industrial M&R Station Equipment 3,550,741 (20,060) 3,570,801 741,436 - 741,436
31 Subtotal 8,354,016,736$ (39,626,591)$ 8,393,643,328$ 1,690,958,674$ 77,757,536$ 1,613,201,138$
32
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Direct Current Year Plant Adjustments
IRA-7A Adjustments Direct Page 1 of 2
174
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Per Book Gross
Plant As of
12/31/22
Plant
Adjustments
Adjusted Gross
Plant as of
12/31/22
Per Book
Accumulated
Depreciation As
of 12/31/22
Accumulated
Depreciation
Adjustments
Adjusted
Accumulated
Depreciation as
of 12/31/22
(a) (b) (c) (d) (e) (f) (g) = (e) - (f) (h) (i) (j) = (h) - (i)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Direct Current Year Plant Adjustments
33 6. GENERAL PLANT
34 389.00 Land and Land Rights 5,006,336$ -$ 5,006,336$ (2,881)$ -$ (2,881)$
35 390.00 Structures and Improvements 64,586,417 54,222 64,532,196 20,352,632 19,927 20,332,706
36 390.04 Air Conditioning Equipment 559,367 - 559,367 103,817 - 103,817
37 391.00 Office Furniture and Equipment 7,582,308 - 7,582,308 (1,906,126) - (1,906,126)
38 392.00 Transportation Equipment 414,881 19,915 394,966 354,333 18,905 335,428
39 393.00 Stores Equipment 128,968 - 128,968 47,195 - 47,195
40 394.00 Tools, Shop, and Garage Equipment 33,392,717 - 33,392,717 11,559,860 - 11,559,860
41 395.00 Laboratory Equipment 1,163,017 - 1,163,017 197,154 - 197,154
42 396.00 Power Operated Equipment 1,584,794 - 1,584,794 839,293 - 839,293
43 397.00 Communication Equipment 2,362,192 - 2,362,192 1,993,181 - 1,993,181
44 398.00 Miscellaneous Equipment 2,291,203 - 2,291,203 1,505,208 - 1,505,208
45 399.00 Other Tangible Property 185,229 - 185,229 171,356 - 171,356
46 399.01 Other Tangible Property - Servers Hardware 4,377 - 4,377 4,377 - 4,377
47 399.02 Other Tangible Property - Servers Software 237,611 - 237,611 235,812 - 235,812
48 399.03 Other Tangible Property - Network Hardware 1,561,636 - 1,561,636 792,249 - 792,249
49 399.06 Other Tangible Property - PC Hardware 11,829,430 - 11,829,430 6,365,203 - 6,365,203
50 399.07 Other Tangible Property - PC Software 396,293 - 396,293 188,380 - 188,380
51 399.08 Other Tangible Property - Application Software 825,602 - 825,602 238,592 - 238,592
52 RWIP Retirement Work In Progress - - - (9,019,115) - (9,019,115)
53 Subtotal 134,112,377$ 74,137$ 134,038,240$ 34,020,517$ 38,832$ 33,981,686$
54
55 TOTAL 8,489,069,333$ (39,340,362)$ 8,528,409,695$ 1,725,907,746$ 77,920,089$ 1,647,987,657$
56 Miscellaneous Adjustments
57 Adjusted Total 8,489,069,333$ (39,340,362)$ 8,528,409,695$ 1,725,907,746$ 77,920,089$ 1,647,987,657$
IRA-7A Adjustments Direct Page 2 of 2
175
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Change in
Gross Plant as
of 12/31/22
Depreciation
Rate per GUD
No. 10779
Depreciation
Expense
Accumulated
Depreciation Net Plant
(a) (b) (c) (d) (e) (f) (g) (h) (i)
11 1. INTANGIBLE PLANT
12 301.00 Organization -$ 0.00% -$ -$ -$
13 302.00 Franchises and Consents - 0.00% - - -
14 303.00 Miscellaneous Intangible Plant - 0.00% - - -
15 Subtotal -$ -$ -$ -$
16
17 5. DISTRIBUTION PLANT
18 374.01 Land -$ 0.00% -$ -$ -$
19 374.02 Land Rights - 0.98% - 33,774 (33,774)
20 375.00 Structures and Improvements 5,053 1.71% 86 30,146 (25,093)
21 376.00 Mains - Cathodic Protection 18,943,656 1.85% 350,458 2,869,199 16,074,457
22 376.01 Mains - Steel 56,860,201 3.97% 2,257,350 (6,468,084) 63,328,284
23 376.02 Mains - Plastic 546,456,902 2.21% 12,076,698 67,707,945 478,748,957
24 378.00 M&R Station Equipment 18,435,580 3.09% 569,659 (6,457,643) 24,893,222
25 379.00 City Gate Equipment 226,332 1.88% 4,255 127,878 98,454
26 380.00 Services 252,772,807 3.67% 9,276,762 54,584,175 198,188,632
27 381.00 Meters 22,546,207 3.31% 746,279 2,247,460 20,298,746
28 382.00 Meter Installations 54,895,958 3.66% 2,009,192 3,238,436 51,657,522
29 383.00 House Regulators (1,717,572) 3.50% (60,115) 901,258 (2,618,830)
30 385.00 Industrial M&R Station Equipment 324,185 2.80% 9,077 93,117 231,068
31 Subtotal 969,749,307$ 27,239,702$ 118,907,662$ 850,841,645$
32
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Direct Incremental Plant
IRA-8 Direct Incremental Plant Page 1 of 2 176
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Change in
Gross Plant as
of 12/31/22
Depreciation
Rate per GUD
No. 10779
Depreciation
Expense
Accumulated
Depreciation Net Plant
(a) (b) (c) (d) (e) (f) (g) (h) (i)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Direct Incremental Plant
33 6. GENERAL PLANT
34 389.00 Land and Land Rights (134,822)$ 0.00% -$ (2,995)$ (131,827)$
35 390.00 Structures and Improvements 2,019,284 2.54% 51,290 (935,302) 2,954,586
36 390.04 Air Conditioning Equipment 70,565 2.75% 1,941 13,628 56,937
37 391.00 Office Furniture and Equipment (991,305) 4.00% (39,652) (740,665) (250,640)
38 392.00 Transportation Equipment (345,519) 9.04% (2,931) (148,805) (196,714)
39 393.00 Stores Equipment - 4.00% 38 5,337 (5,337)
40 394.00 Tools, Shop, and Garage Equipment 43,333 5.00% 12,600 (746,838) 790,170
41 395.00 Laboratory Equipment (344,291) 10.00% (2,751) (171,155) (173,136)
42 396.00 Power Operated Equipment - 7.24% (0) 114,739 (114,739)
43 397.00 Communication Equipment - 6.67% - 167,482 (167,482)
44 398.00 Miscellaneous Equipment 43,775 2.50% 1,094 144,986 (101,211)
45 399.00 Other Tangible Property (29,914) 14.29% (4,275) (2,376) (27,538)
46 399.01 Other Tangible Property - Servers Hardware (63,528) 14.29% - (63,528) -
47 399.02 Other Tangible Property - Servers Software (7,694) 14.29% (1,099) 26,989 (34,683)
48 399.03 Other Tangible Property - Network Hardware 241,145 11.11% 26,791 31,902 209,243
49 399.06 Other Tangible Property - PC Hardware (635,606) 14.29% (90,828) (899,970) 264,364
50 399.07 Other Tangible Property - PC Software (9,216) 14.29% (1,317) 50,178 (59,394)
51 399.08 Other Tangible Property - Application Software (203,719) 14.29% (29,111) (59,188) (144,531)
52 RWIP Retirement Work In Progress - - (1,919,563) 1,919,563
53 Subtotal (347,513)$ (78,212)$ (5,135,144)$ 4,787,631$
54
55 TOTAL 969,401,794$ 27,161,490$ 113,772,518$ 855,629,276$
56 Accrual for Reserve Deficiency (AR 15) - (719) - -
57 Adjusted Total 969,401,794$ 27,160,771$ 113,772,518$ 855,629,276$
IRA-8 Direct Incremental Plant Page 2 of 2 177
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Prior Year
Adjusted Gross
Plant As of
12/31/21
Depreciation
Rate per GUD
No. 10779
Depreciation
Expense
Adjusted
Accumulated
Depreciation As
of 12/31/21 Net Plant
Prior Year
Allocation
Factor
Allocated
Adjusted Gross
Plant
Allocated
Depreciation
Expense
Allocated
Adjusted
Accumulated
Depreciation
Allocated Net
Plant
(a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) (j) (k) = (e) x (j) (l) = (g) x (j) (m) = (h) x (j) (n) = (i) x (j)
11 SSU GENERAL OFFICE (DIVISION 002)
12 6. GENERAL PLANT
13 390.00 Structures and Improvements 1,438,336$ 3.34% 48,040$ 677,168$ 761,168$ 40.26% 579,074$ 19,341$ 272,628$ 306,446$
14 390.09 Improvements to Leased Premises 8,680,122 4.06% 352,413 8,633,608 46,514 40.26% 3,494,617 141,881 3,475,891 18,726
15 391.00 Office Furniture and Equipment 4,649,328 4.03% 187,368 2,177,759 2,471,569 40.26% 1,871,819 75,434 876,766 995,054
16 392.00 Transportation Equipment 315,397 28.96% 91,339 99,997 215,400 40.26% 126,979 36,773 40,259 86,720
17 393.00 Stores Equipment - 10.00% - - - 40.26% - - - -
18 394.00 Tools, Shop, and Garage Equipment 76,071 8.88% 6,755 53,680 22,392 40.26% 30,626 2,720 21,611 9,015
19 395.00 Laboratory Equipment - 10.00% - - - 40.26% - - - -
20 397.00 Communication Equipment 542,130 5.54% 30,034 18,841 523,289 40.26% 218,262 12,092 7,585 210,676
21 398.00 Miscellaneous Equipment 107,931 1.72% 1,856 31,860 76,071 40.26% 43,453 747 12,827 30,626
22 399.00 Other Tangible Property - 13.84% - (0) 0 40.26% - - (0) 0
23 399.01 Other Tangible Property - Servers Hardware 28,375,631 8.62% 2,445,979 1,275,448 27,100,183 40.26% 11,424,029 984,751 513,495 10,910,534
24 399.02 Other Tangible Property - Servers Software 6,489,630 8.78% 569,790 6,419,913 69,717 40.26% 2,612,725 229,397 2,584,657 28,068
25 399.03 Other Tangible Property - Network Hardware 4,284,443 8.72% 373,603 1,144,206 3,140,238 40.26% 1,724,917 150,413 460,657 1,264,260
26 399.06 Other Tangible Property - PC Hardware 2,911,008 8.78% 255,587 36,464 2,874,545 40.26% 1,171,972 102,899 14,680 1,157,292
27 399.07 Other Tangible Property - PC Software 1,178,940 6.64% 78,282 234,901 944,039 40.26% 474,641 31,516 94,571 380,070
28 399.08 Other Tangible Property - Application Software 86,493,504 6.57% 5,682,623 43,611,082 42,882,422 40.26% 34,822,285 2,287,824 17,557,821 17,264,463
29 399.09 Other Tangible Property - Mainframe Software - 6.21% - - - 40.26% - - - -
30 RWIP Retirement Work In Progress - - - - 40.26% - - - -
31 Subtotal 145,542,472$ 10,123,670$ 64,414,926$ 81,127,546$ 58,595,399$ 4,075,789$ 25,933,449$ 32,661,950$
32
33 SSU GENERAL OFFICE - GREENVILLE DATA CENTER
34 6. GENERAL PLANT
35 390.05 Structures and Improvements 14,369,534$ 3.34% 479,942$ 4,602,018$ 9,767,516$ 14.16% 2,035,443$ 67,984$ 651,875$ 1,383,568$
36 391.04 Office Furniture and Equipment 71,036 4.03% 2,863 41,460 29,577 14.16% 10,062 406 5,873 4,190
37 Subtotal 14,440,570$ 482,805$ 4,643,478$ 9,797,093$ 2,045,506$ 68,389$ 657,748$ 1,387,757$
38
39 SSU GENERAL OFFICE - DISTRIBUTION AND MARKETING
40 6. GENERAL PLANT
41 390.20 Structures and Improvements 2,116$ 3.34% 71$ 239$ 1,877$ 50.74% 1,074$ 36$ 121$ 952$
42 390.29 Improvements to Leased Premises 31,824 4.06% 1,292 3,457 28,368 50.74% 16,148 656 1,754 14,394
43 391.20 Office Furniture and Equipment 42,049 4.03% 1,695 15,364 26,685 50.74% 21,336 860 7,796 13,540
44 394.20 Tools, Shop, and Garage Equipment - 8.88% - 388 (388) 50.74% - - 197 (197)
45 397.20 Communication Equipment 8,824 5.54% 489 5,518 3,307 50.74% 4,477 248 2,800 1,678
46 398.20 Miscellaneous Equipment 7,388 1.72% 127 1,566 5,823 50.74% 3,749 64 794 2,954
47 399.21 Other Tangible Property - Servers Hardware 1,324,663 8.62% 114,186 680,618 644,044 50.74% 672,134 57,938 345,346 326,788
48 399.22 Other Tangible Property - Servers Software 5,425,529 8.78% 476,361 1,340,996 4,084,532 50.74% 2,752,913 241,706 680,422 2,072,492
49 399.23 Other Tangible Property - Network Hardware 184,214 8.72% 16,063 24,975 159,239 50.74% 93,470 8,151 12,672 80,798
50 399.26 Other Tangible Property - PC Hardware 376,232 8.78% 33,033 164,063 212,169 50.74% 190,900 16,761 83,245 107,655
51 399.28 Other Tangible Property - Application Software 27,358,036 6.57% 1,797,423 16,249,812 11,108,224 50.74% 13,881,467 912,012 8,245,155 5,636,313
52 Subtotal 34,760,875$ 2,440,740$ 18,486,995$ 16,273,880$ 17,637,668$ 1,238,432$ 9,380,301$ 8,257,366$
53
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Initial or Prior Year Plant - SSU
IRA-9 Alloc. Initial Plant Page 1 of 3 178
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Prior Year
Adjusted Gross
Plant As of
12/31/21
Depreciation
Rate per GUD
No. 10779
Depreciation
Expense
Adjusted
Accumulated
Depreciation As
of 12/31/21 Net Plant
Prior Year
Allocation
Factor
Allocated
Adjusted Gross
Plant
Allocated
Depreciation
Expense
Allocated
Adjusted
Accumulated
Depreciation
Allocated Net
Plant
(a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) (j) (k) = (e) x (j) (l) = (g) x (j) (m) = (h) x (j) (n) = (i) x (j)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Initial or Prior Year Plant - SSU
54 SSU GENERAL OFFICE - ALIGNE PIPE PROJECTS
55 6. GENERAL PLANT
56 399.31 Other Tangible Property - Servers Hardware 297,267$ 8.62% 25,624$ 152,366$ 144,900$ 5.89% 17,520$ 1,510$ 8,980$ 8,540$
57 399.32 Other Tangible Property - Servers Software 783,917 8.78% 68,828 226,050 557,867 5.89% 46,202 4,056 13,323 32,879
58 399.38 Other Tangible Property - Application Software 21,102,100 6.57% 1,386,408 7,944,327 13,157,773 5.89% 1,243,692 81,711 468,214 775,478
59 Subtotal 22,183,283$ 1,480,860$ 8,322,743$ 13,860,540$ 1,307,413$ 87,277$ 490,516$ 816,897$
60
61 TOTAL SSU GENERAL OFFICE 216,927,201$ 14,528,075$ 95,868,142$ 121,059,059$ 79,585,986$ 5,469,888$ 36,462,015$ 43,123,971$
62
63 SSU CUSTOMER SUPPORT (DIVISION 012)
64 6. GENERAL PLANT
65 389.00 Land and Land Rights 2,874,240$ 0.00% -$ -$ 2,874,240$ 52.74% 1,515,874$ -$ -$ 1,515,874$
66 390.00 Structures and Improvements 13,511,944 3.34% 451,299 3,284,175 10,227,769 52.74% 7,126,199 238,015 1,732,074 5,394,125
67 390.09 Improvements to Leased Premises 2,812,746 4.06% 114,197 2,029,757 782,988 52.74% 1,483,442 60,228 1,070,494 412,948
68 391.00 Office Furniture and Equipment 2,670,623 4.03% 107,626 1,175,986 1,494,637 52.74% 1,408,487 56,762 620,215 788,271
69 397.00 Communication Equipment 1,913,117 5.54% 105,987 1,411,629 501,488 52.74% 1,008,978 55,897 744,493 264,485
70 398.00 Miscellaneous Equipment 57,552 1.72% 990 15,051 42,501 52.74% 30,353 522 7,938 22,415
71 399.00 Other Tangible Property - 13.84% - (154,265) 154,265 52.74% - - (81,359) 81,359
72 399.01 Other Tangible Property - Servers Hardware 9,983,514 8.62% 860,579 6,845,518 3,137,996 52.74% 5,265,305 453,869 3,610,326 1,654,979
73 399.02 Other Tangible Property - Servers Software 2,208,691 8.78% 193,923 1,810,871 397,820 52.74% 1,164,864 102,275 955,054 209,810
74 399.03 Other Tangible Property - Network Hardware 720,084 8.72% 62,791 151,497 568,587 52.74% 379,772 33,116 79,899 299,873
75 399.06 Other Tangible Property - PC Hardware 792,277 8.78% 69,562 (138,408) 930,685 52.74% 417,847 36,687 (72,996) 490,843
76 399.07 Other Tangible Property - PC Software - 6.64% - (57,199) 57,199 52.74% - - (30,167) 30,167
77 399.08 Other Tangible Property - Application Software 98,075,501 6.57% 6,443,560 50,484,701 47,590,800 52.74% 51,725,019 3,398,334 26,625,631 25,099,388
78 Subtotal 135,620,290$ 8,410,515$ 66,859,314$ 68,760,975$ 71,526,141$ 4,435,706$ 35,261,602$ 36,264,538$
79
IRA-9 Alloc. Initial Plant Page 2 of 3 179
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Prior Year
Adjusted Gross
Plant As of
12/31/21
Depreciation
Rate per GUD
No. 10779
Depreciation
Expense
Adjusted
Accumulated
Depreciation As
of 12/31/21 Net Plant
Prior Year
Allocation
Factor
Allocated
Adjusted Gross
Plant
Allocated
Depreciation
Expense
Allocated
Adjusted
Accumulated
Depreciation
Allocated Net
Plant
(a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) (j) (k) = (e) x (j) (l) = (g) x (j) (m) = (h) x (j) (n) = (i) x (j)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Initial or Prior Year Plant - SSU
80 SSU CUSTOMER SUPPORT - CHARLES K. VAUGHN TRAINING CENTER
81 6. GENERAL PLANT
82 389.10 Land and Land Rights 1,886,443$ 0.00% -$ -$ 1,886,443$ 75.72% 1,428,362$ -$ -$ 1,428,362$
83 390.10 Structures and Improvements 12,586,758 3.34% 420,398 4,195,862 8,390,896 75.72% 9,530,340 318,313 3,176,989 6,353,351
84 391.10 Office Furniture and Equipment 565,504 4.03% 22,790 114,184 451,320 75.72% 428,184 17,256 86,457 341,727
85 392.10 Transportation Equipment 96,290 28.96% 27,886 96,252 38 75.72% 72,908 21,114 72,880 29
86 394.10 Tools, Shop, and Garage Equipment 595,558 8.88% 52,886 248,835 346,722 75.72% 450,940 40,043 188,411 262,528
87 395.10 Laboratory Equipment 23,632 10.00% 2,363 23,264 368 75.72% 17,894 1,789 17,615 278
88 397.10 Communication Equipment 345,956 5.54% 19,166 213,292 132,664 75.72% 261,948 14,512 161,499 100,449
89 398.10 Miscellaneous Equipment 537,587 1.72% 9,246 170,234 367,353 75.72% 407,046 7,001 128,896 278,150
90 399.10 Other Tangible Property 299,459 13.84% 41,445 215,904 83,555 75.72% 226,742 31,381 163,477 63,265
91 399.16 Other Tangible Property - PC Hardware 72,357 8.78% 6,353 53,851 18,505 75.72% 54,786 4,810 40,775 14,012
92 399.17 Other Tangible Property - PC Software 3,299 6.64% 219 (27,625) 30,924 75.72% 2,498 166 (20,917) 23,414
93 399.18 Other Tangible Property - Application Software - 15.89% - (9,966) 9,966 75.72% - - (7,546) 7,546
94 Subtotal 17,012,843$ 602,751$ 5,294,088$ 11,718,754$ 12,881,648$ 456,387$ 4,008,535$ 8,873,112$
95
96 TOTAL SSU CUSTOMER SUPPORT 152,633,132$ 9,013,266$ 72,153,403$ 80,479,730$ 84,407,788$ 4,892,092$ 39,270,138$ 45,137,651$
97
98 TOTAL SSU GENERAL OFFICE AND CUSTOMER SUPPORT 369,560,333$ 23,541,342$ 168,021,544$ 201,538,789$ 163,993,774$ 10,361,980$ 75,732,153$ 88,261,622$
99
100 Miscellaneous Adjustments 1- - 897,009 (897,009) 40.26% - - 361,136 (361,136)
101 Adjusted Total 369,560,333$ 23,541,342$ 168,918,553$ 200,641,780$ 163,993,774$ 10,361,980$ 76,093,289$ 87,900,486$
102
103 Note:
104 1. The Miscellaneous Adjustment (Line 100) relates to a reclass of depreciation and amortization expense resulting from a Willis Towers Watson adjustment identified
for the years 2018 through 2021. Amortization began in November 2021 and will continue for 5 years.
IRA-9 Alloc. Initial Plant Page 3 of 3 180
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Adjusted Gross
Plant As of
12/31/22
Depreciation
Rate Per
GUD No. 10779
Depreciation
Expense
Adjusted
Accumulated
Depreciation As
of 12/31/22 Net Plant
Current
Year
Allocation
Factor
Allocated
Adjusted
Gross Plant
Allocated
Depreciation
Expense
Allocated
Adjusted
Accumulated
Depreciation
Allocated
Net Plant
(a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) (j) (k) = (e) x (j) (l) = (g) x (j) (m) = (h) x (j) (n) = (i) x (j)
11 SSU GENERAL OFFICE (DIVISION 002)
12 6. GENERAL PLANT
13 390.00 Structures and Improvements 1,438,336$ 3.34% 48,040$ 726,410$ 711,926$ 40.09% 576,629$ 19,259$ 291,218$ 285,411$
14 390.09 Improvements to Leased Premises 8,657,204 4.06% 351,482 8,649,166 8,038 40.09% 3,470,673 140,909 3,467,451 3,222
15 391.00 Office Furniture and Equipment 4,755,212 4.03% 191,635 2,384,099 2,371,114 40.09% 1,906,365 76,826 955,785 950,580
16 392.00 Transportation Equipment 315,397 28.96% 91,339 153,576 161,822 40.09% 126,443 36,618 61,568 64,874
17 393.00 Stores Equipment - 10.00% - - - 40.09% - - - -
18 394.00 Tools, Shop, and Garage Equipment 76,071 8.88% 6,755 60,393 15,679 40.09% 30,497 2,708 24,211 6,286
19 395.00 Laboratory Equipment - 10.00% - - - 40.09% - - - -
20 397.00 Communication Equipment 386,282 5.54% 21,400 42,105 344,176 40.09% 154,860 8,579 16,880 137,980
21 398.00 Miscellaneous Equipment 107,931 1.72% 1,856 36,024 71,907 40.09% 43,270 744 14,442 28,828
22 399.00 Other Tangible Property - 13.84% - (0) 0 40.09% - - (0) 0
23 399.01 Other Tangible Property - Servers Hardware 36,095,200 8.62% 3,111,406 4,509,421 31,585,778 40.09% 14,470,565 1,247,363 1,807,827 12,662,739
24 399.02 Other Tangible Property - Servers Software 6,594,516 8.78% 578,999 6,557,522 36,994 40.09% 2,643,742 232,121 2,628,911 14,831
25 399.03 Other Tangible Property - Network Hardware 4,425,992 8.72% 385,946 1,507,406 2,918,586 40.09% 1,774,380 154,726 604,319 1,170,061
26 399.06 Other Tangible Property - PC Hardware 3,651,922 8.78% 320,639 410,698 3,241,224 40.09% 1,464,055 128,544 164,649 1,299,407
27 399.07 Other Tangible Property - PC Software 87,226 6.64% 5,792 52,371 34,855 40.09% 34,969 2,322 20,996 13,973
28 399.08 Other Tangible Property - Application Software 91,436,180 6.57% 6,007,357 49,789,305 41,646,875 40.09% 36,656,764 2,408,349 19,960,532 16,696,232
29 399.09 Other Tangible Property - Mainframe Software - 6.21% - - - 40.09% - - - -
30 RWIP Retirement Work In Progress - - - - 40.09% - - - -
31 Subtotal 158,027,469$ 11,122,647$ 74,878,495$ 83,148,973$ 63,353,212$ 4,459,069$ 30,018,789$ 33,334,423$
32
33 SSU GENERAL OFFICE - GREENVILLE DATA CENTER
34 6. GENERAL PLANT
35 390.05 Structures and Improvements 14,064,998$ 3.34% 469,771$ 4,983,831$ 9,081,167$ 14.18% 1,994,245$ 66,608$ 706,646$ 1,287,599$
36 391.04 Office Furniture and Equipment 82,909 4.03% 3,341 44,747 38,162 14.18% 11,756 474 6,345 5,411
37 Subtotal 14,147,907$ 473,112$ 5,028,577$ 9,119,329$ 2,006,001$ 67,082$ 712,991$ 1,293,010$
38
39 SSU GENERAL OFFICE - DISTRIBUTION AND MARKETING
40 6. GENERAL PLANT
41 390.20 Structures and Improvements 24,633$ 3.34% 823$ 570$ 24,063$ 51.13% 12,595$ 421$ 291$ 12,304$
42 390.29 Improvements to Leased Premises 54,743 4.06% 2,223 11,120 43,623 51.13% 27,990 1,136 5,686 22,304
43 391.20 Office Furniture and Equipment 65,827 4.03% 2,653 17,952 47,875 51.13% 33,657 1,356 9,179 24,479
44 394.20 Tools, Shop, and Garage Equipment - 8.88% - 388 (388) 51.13% - - 198 (198)
45 397.20 Communication Equipment 8,824 5.54% 489 6,030 2,794 51.13% 4,512 250 3,083 1,429
46 398.20 Miscellaneous Equipment 7,388 1.72% 127 1,802 5,586 51.13% 3,778 65 921 2,856
47 399.21 Other Tangible Property - Servers Hardware 1,375,924 8.62% 118,605 812,250 563,674 51.13% 703,510 60,643 415,303 288,207
48 399.22 Other Tangible Property - Servers Software 5,425,529 8.78% 476,361 1,835,463 3,590,066 51.13% 2,774,073 243,564 938,472 1,835,601
49 399.23 Other Tangible Property - Network Hardware 194,180 8.72% 16,933 41,810 152,370 51.13% 99,284 8,658 21,377 77,907
50 399.26 Other Tangible Property - PC Hardware 385,133 8.78% 33,815 205,141 179,992 51.13% 196,918 17,289 104,889 92,030
51 399.28 Other Tangible Property - Application Software 28,045,958 6.57% 1,842,619 18,147,198 9,898,760 51.13% 14,339,898 942,131 9,278,662 5,061,236
52 Subtotal 35,588,140$ 2,494,647$ 21,079,723$ 14,508,417$ 18,196,216$ 1,275,513$ 10,778,062$ 7,418,153$
53
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Current Year Plant (Adjusted) - SSU
IRA-10 Alloc. Current Plant Page 1 of 3 181
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Adjusted Gross
Plant As of
12/31/22
Depreciation
Rate Per
GUD No. 10779
Depreciation
Expense
Adjusted
Accumulated
Depreciation As
of 12/31/22 Net Plant
Current
Year
Allocation
Factor
Allocated
Adjusted
Gross Plant
Allocated
Depreciation
Expense
Allocated
Adjusted
Accumulated
Depreciation
Allocated
Net Plant
(a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) (j) (k) = (e) x (j) (l) = (g) x (j) (m) = (h) x (j) (n) = (i) x (j)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Current Year Plant (Adjusted) - SSU
54 SSU GENERAL OFFICE - ALIGNE PIPE PROJECTS
55 6. GENERAL PLANT
56 399.31 Other Tangible Property - Servers Hardware 297,267$ 8.62% 25,624$ 180,590$ 116,677$ 6.13% 18,237$ 1,572$ 11,079$ 7,158$
57 399.32 Other Tangible Property - Servers Software 783,917 8.78% 68,828 297,033 486,883 6.13% 48,092 4,222 18,222 29,869
58 399.38 Other Tangible Property - Application Software 21,123,037 6.57% 1,387,784 9,316,859 11,806,178 6.13% 1,295,860 85,138 571,572 724,287
59 Subtotal 22,204,220$ 1,482,236$ 9,794,482$ 12,409,738$ 1,362,188$ 90,932$ 600,873$ 761,315$
60
61 TOTAL SSU GENERAL OFFICE 229,967,735$ 15,572,642$ 110,781,278$ 119,186,457$ 84,917,617$ 5,892,596$ 42,110,716$ 42,806,901$
62
63 SSU CUSTOMER SUPPORT (DIVISION 012)
64 6. GENERAL PLANT
65 389.00 Land and Land Rights 2,874,240$ 0.00% -$ -$ 2,874,240$ 53.00% 1,523,347$ -$ -$ 1,523,347$
66 390.00 Structures and Improvements 13,511,944 3.34% 451,299 3,701,500 9,810,444 53.00% 7,161,330 239,188 1,961,795 5,199,535
67 390.09 Improvements to Leased Premises 3,003,620 4.06% 121,947 2,151,653 851,968 53.00% 1,591,919 64,632 1,140,376 451,543
68 391.00 Office Furniture and Equipment 2,670,623 4.03% 107,626 1,296,498 1,374,125 53.00% 1,415,430 57,042 687,144 728,286
69 397.00 Communication Equipment 1,913,117 5.54% 105,987 1,522,530 390,587 53.00% 1,013,952 56,173 806,941 207,011
70 398.00 Miscellaneous Equipment 71,627 1.72% 1,232 17,235 54,392 53.00% 37,962 653 9,135 28,828
71 399.00 Other Tangible Property - 13.84% - (154,265) 154,265 53.00% - - (81,760) 81,760
72 399.01 Other Tangible Property - Servers Hardware 12,194,175 8.62% 1,051,138 7,959,124 4,235,051 53.00% 6,462,913 557,103 4,218,336 2,244,577
73 399.02 Other Tangible Property - Servers Software 2,208,691 8.78% 193,923 2,011,313 197,378 53.00% 1,170,606 102,779 1,065,996 104,610
74 399.03 Other Tangible Property - Network Hardware 721,114 8.72% 62,881 205,244 515,870 53.00% 382,190 33,327 108,779 273,411
75 399.06 Other Tangible Property - PC Hardware 858,992 8.78% 75,420 (47,887) 906,879 53.00% 455,266 39,972 (25,380) 480,646
76 399.07 Other Tangible Property - PC Software - 6.64% - (57,199) 57,199 53.00% - - (30,316) 30,316
77 399.08 Other Tangible Property - Application Software 102,030,507 6.57% 6,703,404 57,252,343 44,778,164 53.00% 54,076,169 3,552,804 30,343,742 23,732,427
78 Subtotal 142,058,651$ 8,874,857$ 75,858,088$ 66,200,563$ 75,291,085$ 4,703,674$ 40,204,787$ 35,086,298$
79
IRA-10 Alloc. Current Plant Page 2 of 3 182
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Adjusted Gross
Plant As of
12/31/22
Depreciation
Rate Per
GUD No. 10779
Depreciation
Expense
Adjusted
Accumulated
Depreciation As
of 12/31/22 Net Plant
Current
Year
Allocation
Factor
Allocated
Adjusted
Gross Plant
Allocated
Depreciation
Expense
Allocated
Adjusted
Accumulated
Depreciation
Allocated
Net Plant
(a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) (j) (k) = (e) x (j) (l) = (g) x (j) (m) = (h) x (j) (n) = (i) x (j)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Current Year Plant (Adjusted) - SSU
80 SSU CUSTOMER SUPPORT - CHARLES K. VAUGHN TRAINING CENTER
81 6. GENERAL PLANT
82 389.10 Land and Land Rights 1,886,443$ 0.00% -$ -$ 1,886,443$ 71.83% 1,354,940$ -$ -$ 1,354,940$
83 390.10 Structures and Improvements 12,586,758 3.34% 420,398 4,598,574 7,988,184 71.83% 9,040,457 301,951 3,302,932 5,737,525
84 391.10 Office Furniture and Equipment 606,777 4.03% 24,453 91,120 515,656 71.83% 435,818 17,563 65,447 370,371
85 392.10 Transportation Equipment 96,290 28.96% - 96,644 (353) 71.83% 69,161 - 69,414 (254)
86 394.10 Tools, Shop, and Garage Equipment 641,147 8.88% 56,934 307,268 333,879 71.83% 460,505 40,893 220,696 239,809
87 395.10 Laboratory Equipment - 10.00% - 125 (125) 71.83% - - 90 (90)
88 397.10 Communication Equipment 86,046 5.54% 4,767 (56,803) 142,849 71.83% 61,803 3,424 (40,799) 102,602
89 398.10 Miscellaneous Equipment 537,587 1.72% 9,246 183,896 353,692 71.83% 386,123 6,641 132,083 254,040
90 399.10 Other Tangible Property 158,990 13.84% 22,004 116,138 42,853 71.83% 114,195 15,805 83,416 30,779
91 399.16 Other Tangible Property - PC Hardware 116,342 8.78% 10,215 52,951 63,391 71.83% 83,563 7,337 38,032 45,531
92 399.17 Other Tangible Property - PC Software 3,299 6.64% 219 (27,392) 30,691 71.83% 2,370 157 (19,674) 22,044
93 399.18 Other Tangible Property - Application Software - 15.89% - (9,966) 9,966 71.83% - - (7,158) 7,158
94 Subtotal 16,719,680$ 548,236$ 5,352,554$ 11,367,126$ 12,008,935$ 393,772$ 3,844,480$ 8,164,455$
95
96 TOTAL SSU CUSTOMER SUPPORT 158,778,331$ 9,423,093$ 81,210,642$ 77,567,689$ 87,300,020$ 5,097,446$ 44,049,266$ 43,250,753$
97
98 TOTAL SSU GENERAL OFFICE AND CUSTOMER SUPPORT 388,746,066$ 24,995,735$ 191,991,920$ 196,754,146$ 172,217,636$ 10,990,042$ 86,159,982$ 86,057,654$
99
100 Miscellaneous Adjustments - Division 002 1- - 711,421 (711,421) 40.09% - - 285,209 (285,209)
101 Adjusted Total 388,746,066$ 24,995,735$ 192,703,340$ 196,042,725$ 172,217,636$ 10,990,042$ 86,445,190$ 85,772,446$
102
103 Note:
104 1. The Miscellaneous Adjustment (Line 100) relates to a reclass of depreciation and amortization expense resulting from a Willis Towers Watson adjustment
identified for the years 2018 through 2021. Amortization began in November 2021 and will continue for 5 years.
IRA-10 Alloc. Current Plant Page 3 of 3 183
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Per Book Gross
Plant As of
12/31/22
Plant
Adjustments
Adjusted Gross
Plant as of
12/31/22
Per Book
Accumulated
Depreciation As
of 12/31/22
Accumulated
Depreciation
Adjustments
Adjusted
Accumulated
Depreciation as
of 12/31/22
Current
Year
Allocation
Factor
Allocated
Gross Plant
as of 12/31/22
Allocated
Gross Plant
Adjustments
Allocated
Accumulated
Depreciation
as of 12/31/22
Allocated
Accumulated
Depreciation
Adjustments
(a) (b) (c) (d) (e) (f) (g) = (e) - (f) (h) (i) (j) = (h) - (i) (k) (l) = (e) * (k) (m) = (f) * (k) (n) = (h) * (k) (o) = (i) * (k)
11 SSU GENERAL OFFICE (DIVISION 002)
12 6. GENERAL PLANT
13 390.00 Structures and Improvements 5,928,124$ 4,489,788$ 1,438,336$ 1,030,338$ 303,928$ 726,410$ 40.09% 2,376,585$ 1,799,956$ 413,063$ 121,845$
14 390.09 Improvements to Leased Premises 9,896,645 1,239,442 8,657,204 9,834,573 1,185,407 8,649,166 40.09% 3,967,565 496,892 3,942,680 475,230
15 391.00 Office Furniture and Equipment 6,203,949 1,448,736 4,755,212 2,932,855 548,756 2,384,099 40.09% 2,487,163 580,798 1,175,781 219,996
16 392.00 Transportation Equipment 315,397 - 315,397 153,576 - 153,576 40.09% 126,443 - 61,568 -
17 393.00 Stores Equipment - - - - - - 40.09% - - - -
18 394.00 Tools, Shop, and Garage Equipment 76,071 - 76,071 60,393 - 60,393 40.09% 30,497 - 24,211 -
19 395.00 Laboratory Equipment - - - - - - 40.09% - - - -
20 397.00 Communication Equipment 543,959 157,678 386,282 50,180 8,075 42,105 40.09% 218,073 63,213 20,117 3,237
21 398.00 Miscellaneous Equipment 107,931 - 107,931 36,024 - 36,024 40.09% 43,270 - 14,442 -
22 399.00 Other Tangible Property - - - (0) - (0) 40.09% - - (0) -
23 399.01 Other Tangible Property - Servers Hardware 36,146,461 51,262 36,095,200 4,514,019 4,598 4,509,421 40.09% 14,491,116 20,551 1,809,670 1,843
24 399.02 Other Tangible Property - Servers Software 6,594,516 - 6,594,516 6,557,522 - 6,557,522 40.09% 2,643,742 - 2,628,911 -
25 399.03 Other Tangible Property - Network Hardware 4,435,958 9,966 4,425,992 1,507,862 456 1,507,406 40.09% 1,778,375 3,995 604,502 183
26 399.06 Other Tangible Property - PC Hardware 3,660,823 8,901 3,651,922 411,164 466 410,698 40.09% 1,467,624 3,568 164,836 187
27 399.07 Other Tangible Property - PC Software 87,226 - 87,226 52,371 - 52,371 40.09% 34,969 - 20,996 -
28 399.08 Other Tangible Property - Application Software 92,124,108 687,928 91,436,180 49,851,724 62,419 49,789,305 40.09% 36,932,555 275,790 19,985,556 25,024
29 399.09 Other Tangible Property - Mainframe Software - - - - - - 40.09% - - - -
30 RWIP Retirement Work In Progress - - - - - - 40.09% - - - -
31 Subtotal 166,121,169$ 8,093,700$ 158,027,469$ 76,992,600$ 2,114,104$ 74,878,495$ 66,597,977$ 3,244,765$ 30,866,333$ 847,544$
32
33 SSU GENERAL OFFICE - GREENVILLE DATA CENTER
34 6. GENERAL PLANT
35 390.05 Structures and Improvements 14,064,998$ -$ 14,064,998$ 4,983,831$ -$ 4,983,831$ 14.18% 1,994,245$ -$ 706,646$ -$
36 391.04 Office Furniture and Equipment 82,909 - 82,909 44,747 - 44,747 14.18% 11,756 - 6,345 -
37 Subtotal 14,147,907$ -$ 14,147,907$ 5,028,577$ -$ 5,028,577$ 2,006,001$ -$ 712,991$ -$
38
39 SSU GENERAL OFFICE - DISTRIBUTION AND MARKETING
40 6. GENERAL PLANT
41 390.20 Structures and Improvements 2,116$ (22,517)$ 24,633$ 305$ (265)$ 570$ 51.13% 1,082$ (11,513)$ 156$ (135)$
42 390.29 Improvements to Leased Premises 31,824 (22,919) 54,743 4,793 (6,327) 11,120 51.13% 16,272 (11,718) 2,451 (3,235)
43 391.20 Office Furniture and Equipment 263,338 197,511 65,827 151,383 133,431 17,952 51.13% 134,645 100,987 77,402 68,223
44 394.20 Tools, Shop, and Garage Equipment - - - 388 - 388 51.13% - - 198 -
45 397.20 Communication Equipment 8,824 - 8,824 6,030 - 6,030 51.13% 4,512 - 3,083 -
46 398.20 Miscellaneous Equipment 7,388 - 7,388 1,802 - 1,802 51.13% 3,778 - 921 -
47 399.21 Other Tangible Property - Servers Hardware 1,324,663 (51,262) 1,375,924 807,652 (4,598) 812,250 51.13% 677,300 (26,210) 412,952 (2,351)
48 399.22 Other Tangible Property - Servers Software 5,425,529 - 5,425,529 1,835,463 - 1,835,463 51.13% 2,774,073 - 938,472 -
49 399.23 Other Tangible Property - Network Hardware 184,214 (9,966) 194,180 41,354 (456) 41,810 51.13% 94,189 (5,096) 21,144 (233)
50 399.26 Other Tangible Property - PC Hardware 376,232 (8,901) 385,133 204,675 (466) 205,141 51.13% 192,367 (4,551) 104,650 (238)
51 399.28 Other Tangible Property - Application Software 27,358,036 (687,922) 28,045,958 18,084,782 (62,416) 18,147,198 51.13% 13,988,164 (351,735) 9,246,749 (31,913)
52 Subtotal 34,982,164$ (605,976)$ 35,588,140$ 21,138,627$ 58,904$ 21,079,723$ 17,886,380$ (309,835)$ 10,808,180$ 30,117$
53
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Current Year Plant Adjustments - SSU
IRA-10A Adjustments Alloc
Page 1 of 3
184
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Per Book Gross
Plant As of
12/31/22
Plant
Adjustments
Adjusted Gross
Plant as of
12/31/22
Per Book
Accumulated
Depreciation As
of 12/31/22
Accumulated
Depreciation
Adjustments
Adjusted
Accumulated
Depreciation as
of 12/31/22
Current
Year
Allocation
Factor
Allocated
Gross Plant
as of 12/31/22
Allocated
Gross Plant
Adjustments
Allocated
Accumulated
Depreciation
as of 12/31/22
Allocated
Accumulated
Depreciation
Adjustments
(a) (b) (c) (d) (e) (f) (g) = (e) - (f) (h) (i) (j) = (h) - (i) (k) (l) = (e) * (k) (m) = (f) * (k) (n) = (h) * (k) (o) = (i) * (k)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Current Year Plant Adjustments - SSU
54 SSU GENERAL OFFICE - ALIGNE PIPE PROJECTS
55 6. GENERAL PLANT
56 399.31 Other Tangible Property - Servers Hardware 297,267$ -$ 297,267$ 180,590$ -$ 180,590$ 6.13% 18,237$ -$ 11,079$ -$
57 399.32 Other Tangible Property - Servers Software 783,917 - 783,917 297,033 - 297,033 6.13% 48,092 - 18,222 -
58 399.38 Other Tangible Property - Application Software 21,123,037 - 21,123,037 9,316,859 - 9,316,859 6.13% 1,295,860 - 571,572 -
59 Subtotal 22,204,220$ -$ 22,204,220$ 9,794,482$ -$ 9,794,482$ 1,362,188$ -$ 600,873$ -$
60
61 TOTAL SSU GENERAL OFFICE 237,455,460$ 7,487,725$ 229,967,735$ 112,954,286$ 2,173,008$ 110,781,278$ 87,852,546$ 2,934,929$ 42,988,377$ 877,662$
62
63 SSU CUSTOMER SUPPORT (DIVISION 012)
64 6. GENERAL PLANT
65 389.00 Land and Land Rights 2,874,240$ -$ 2,874,240$ -$ -$ -$ 53.00% 1,523,347$ -$ -$ -$
66 390.00 Structures and Improvements 13,511,944 - 13,511,944 3,701,500 - 3,701,500 53.00% 7,161,330 - 1,961,795 -
67 390.09 Improvements to Leased Premises 3,011,488 7,868 3,003,620 2,156,389 4,736 2,151,653 53.00% 1,596,089 4,170 1,142,886 2,510
68 391.00 Office Furniture and Equipment 2,710,774 40,151 2,670,623 1,315,867 19,370 1,296,498 53.00% 1,436,710 21,280 697,410 10,266
69 397.00 Communication Equipment 1,913,117 - 1,913,117 1,522,530 - 1,522,530 53.00% 1,013,952 - 806,941 -
70 398.00 Miscellaneous Equipment 85,451 13,825 71,627 21,588 4,353 17,235 53.00% 45,289 7,327 11,442 2,307
71 399.00 Other Tangible Property - - - (154,265) - (154,265) 53.00% - - (81,760) -
72 399.01 Other Tangible Property - Servers Hardware 12,194,175 - 12,194,175 7,959,124 - 7,959,124 53.00% 6,462,913 - 4,218,336 -
73 399.02 Other Tangible Property - Servers Software 2,208,691 - 2,208,691 2,011,313 - 2,011,313 53.00% 1,170,606 - 1,065,996 -
74 399.03 Other Tangible Property - Network Hardware 721,114 - 721,114 205,244 - 205,244 53.00% 382,190 - 108,779 -
75 399.06 Other Tangible Property - PC Hardware 858,992 - 858,992 (47,887) - (47,887) 53.00% 455,266 - (25,380) -
76 399.07 Other Tangible Property - PC Software - - - (57,199) - (57,199) 53.00% - - (30,316) -
77 399.08 Other Tangible Property - Application Software 102,030,507 - 102,030,507 57,252,343 - 57,252,343 53.00% 54,076,169 - 30,343,742 -
78 Subtotal 142,120,494$ 61,843$ 142,058,651$ 75,886,547$ 28,459$ 75,858,088$ 75,323,862$ 32,777$ 40,219,870$ 15,083$
79
IRA-10A Adjustments Alloc
Page 2 of 3
185
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Per Book Gross
Plant As of
12/31/22
Plant
Adjustments
Adjusted Gross
Plant as of
12/31/22
Per Book
Accumulated
Depreciation As
of 12/31/22
Accumulated
Depreciation
Adjustments
Adjusted
Accumulated
Depreciation as
of 12/31/22
Current
Year
Allocation
Factor
Allocated
Gross Plant
as of 12/31/22
Allocated
Gross Plant
Adjustments
Allocated
Accumulated
Depreciation
as of 12/31/22
Allocated
Accumulated
Depreciation
Adjustments
(a) (b) (c) (d) (e) (f) (g) = (e) - (f) (h) (i) (j) = (h) - (i) (k) (l) = (e) * (k) (m) = (f) * (k) (n) = (h) * (k) (o) = (i) * (k)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Current Year Plant Adjustments - SSU
80 SSU CUSTOMER SUPPORT - CHARLES K. VAUGHN TRAINING CENTER
81 6. GENERAL PLANT
82 389.10 Land and Land Rights 1,886,443$ -$ 1,886,443$ -$ -$ -$ 71.83% 1,354,940$ -$ -$ -$
83 390.10 Structures and Improvements 12,586,758 - 12,586,758 4,598,574 - 4,598,574 71.83% 9,040,457 - 3,302,932 -
84 391.10 Office Furniture and Equipment 606,777 - 606,777 91,120 - 91,120 71.83% 435,818 - 65,447 -
85 392.10 Transportation Equipment 96,290 - 96,290 96,644 - 96,644 71.83% 69,161 - 69,414 -
86 394.10 Tools, Shop, and Garage Equipment 641,147 - 641,147 307,268 - 307,268 71.83% 460,505 - 220,696 -
87 395.10 Laboratory Equipment - - - 125 - 125 71.83% - - 90 -
88 397.10 Communication Equipment 86,046 - 86,046 (56,803) - (56,803) 71.83% 61,803 - (40,799) -
89 398.10 Miscellaneous Equipment 537,587 - 537,587 183,896 - 183,896 71.83% 386,123 - 132,083 -
90 399.10 Other Tangible Property 158,990 - 158,990 116,138 - 116,138 71.83% 114,195 - 83,416 -
91 399.16 Other Tangible Property - PC Hardware 116,342 - 116,342 52,951 - 52,951 71.83% 83,563 - 38,032 -
92 399.17 Other Tangible Property - PC Software 3,299 - 3,299 (27,392) - (27,392) 71.83% 2,370 - (19,674) -
93 399.18 Other Tangible Property - Application Software - - - (9,966) - (9,966) 71.83% - - (7,158) -
94 Subtotal 16,719,680$ -$ 16,719,680$ 5,352,554$ -$ 5,352,554$ 12,008,935$ -$ 3,844,480$ -$
95
96 TOTAL SSU CUSTOMER SUPPORT 158,840,174$ 61,843$ 158,778,331$ 81,239,101$ 28,459$ 81,210,642$ 87,332,797$ 32,777$ 44,064,350$ 15,083$
97
98 TOTAL SSU GENERAL OFFICE AND CUSTOMER SUPPORT 396,295,634$ 7,549,568$ 388,746,066$ 194,193,387$ 2,201,467$ 191,991,920$ 175,185,343$ 2,967,706$ 87,052,727$ 892,745$
99
100 Miscellaneous Adjustments - Division 002 1- - - 711,421 - 711,421 40.09% - - 285,209 -
101 Adjusted Total 396,295,634$ 7,549,568$ 388,746,066$ 194,904,807$ 2,201,467$ 192,703,340$ 175,185,343$ 2,967,706$ 87,337,936$ 892,745$
102
103 Note:
104 1. The Miscellaneous Adjustment (Line 100) relates to a reclass of depreciation and amortization expense resulting from a Willis Towers Watson adjustment identified for
the years 2018 through 2021. Amortization began in November 2021 and will continue for 5 years.
IRA-10A Adjustments Alloc
Page 3 of 3
186
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Change in
Gross Plant
as of 12/31/22
Depreciation
Rate per GUD
No. 10779
Depreciation
Expense
Accumulated
Depreciation Net Plant (1)
Allocated
Gross Plant
Allocated
Depreciation
Expense
Allocated
Accumulated
Depreciation
Allocated
Net Plant
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n)
11 SSU GENERAL OFFICE (DIVISION 002)
12 6. GENERAL PLANT
13 390.00 Structures and Improvements -$ 3.34% -$ 49,242$ (49,242)$ (2,445)$ (82)$ 18,590$ (21,035)$
14 390.09 Improvements to Leased Premises (22,919) 4.06% (930) 15,558 (38,476) (23,944) (972) (8,440) (15,504)
15 391.00 Office Furniture and Equipment 105,885 4.03% 4,267 206,340 (100,455) 34,545 1,392 79,019 (44,474)
16 392.00 Transportation Equipment - 28.96% - 53,578 (53,578) (536) (155) 21,310 (21,846)
17 393.00 Stores Equipment - 10.00% - - - - - - -
18 394.00 Tools, Shop, and Garage Equipment - 8.88% - 6,713 (6,713) (129) (11) 2,600 (2,729)
19 395.00 Laboratory Equipment - 10.00% - - - - - - -
20 397.00 Communication Equipment (155,848) 5.54% (8,634) 23,264 (179,113) (63,401) (3,512) 9,295 (72,696)
21 398.00 Miscellaneous Equipment - 1.72% - 4,164 (4,164) (183) (3) 1,615 (1,799)
22 399.00 Other Tangible Property - 13.84% - - - - - 0 (0)
23 399.01 Other Tangible Property - Servers Hardware 7,719,568 8.62% 665,427 3,233,973 4,485,595 3,046,536 262,611 1,294,332 1,752,205
24 399.02 Other Tangible Property - Servers Software 104,886 8.78% 9,209 137,609 (32,722) 31,017 2,723 44,253 (13,237)
25 399.03 Other Tangible Property - Network Hardware 141,548 8.72% 12,343 363,200 (221,652) 49,463 4,313 143,662 (94,199)
26 399.06 Other Tangible Property - PC Hardware 740,913 8.78% 65,052 374,235 366,679 292,083 25,645 149,969 142,115
27 399.07 Other Tangible Property - PC Software (1,091,713) 6.64% (72,490) (182,530) (909,183) (439,672) (29,194) (73,576) (366,097)
28 399.08 Other Tangible Property - Application Software 4,942,676 6.57% 324,734 6,178,223 (1,235,548) 1,834,480 120,525 2,402,711 (568,231)
29 399.09 Other Tangible Property - Mainframe Software - 6.21% - - - - - - -
30 RWIP Retirement Work In Progress - - - - - - - -
31 Subtotal 12,484,996$ 998,978$ 10,463,570$ 2,021,427$ 4,757,813$ 383,280$ 4,085,340$ 672,473$
32
33 SSU GENERAL OFFICE - GREENVILLE DATA CENTER
34 6. GENERAL PLANT
35 390.05 Structures and Improvements (304,536)$ 3.34% (10,172)$ 381,813$ (686,349)$ (41,198)$ (1,376)$ 54,771$ (95,969)$
36 391.04 Office Furniture and Equipment 11,873 4.03% 478 3,287 8,585 1,693 68 472 1,221
37 Subtotal (292,663)$ (9,693)$ 385,100$ (677,763)$ (39,505)$ (1,308)$ 55,243$ (94,748)$
38
39 SSU GENERAL OFFICE - DISTRIBUTION AND MARKETING
40 6. GENERAL PLANT
41 390.20 Structures and Improvements 22,517$ 3.34% 752$ 331$ 22,186$ 11,521$ 385$ 170$ 11,351$
42 390.29 Improvements to Leased Premises 22,919 4.06% 930 7,664 15,255 11,842 481 3,932 7,910
43 391.20 Office Furniture and Equipment 23,778 4.03% 958 2,588 21,190 12,322 497 1,383 10,939
44 394.20 Tools, Shop, and Garage Equipment - 8.88% - - - - - 2 (2)
45 397.20 Communication Equipment - 5.54% - 512 (512) 34 2 284 (249)
46 398.20 Miscellaneous Equipment - 1.72% - 237 (237) 29 0 127 (98)
47 399.21 Other Tangible Property - Servers Hardware 51,262 8.62% 4,419 131,631 (80,370) 31,376 2,705 69,958 (38,581)
48 399.22 Other Tangible Property - Servers Software (0) 8.78% (0) 494,466 (494,466) 21,160 1,858 258,051 (236,891)
49 399.23 Other Tangible Property - Network Hardware 9,966 8.72% 869 16,834 (6,868) 5,814 507 8,705 (2,891)
50 399.26 Other Tangible Property - PC Hardware 8,901 8.78% 781 41,078 (32,177) 6,018 528 21,643 (15,625)
51 399.28 Other Tangible Property - Application Software 687,922 6.57% 45,196 1,897,386 (1,209,463) 458,431 30,119 1,033,508 (575,077)
52 Subtotal 827,265$ 53,907$ 2,592,728$ (1,765,463)$ 558,548$ 37,081$ 1,397,761$ (839,213)$
53
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Incremental Plant - SSU
IRA-11 Alloc. Incremental Plant Page 1 of 3 187
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Change in
Gross Plant
as of 12/31/22
Depreciation
Rate per GUD
No. 10779
Depreciation
Expense
Accumulated
Depreciation Net Plant (1)
Allocated
Gross Plant
Allocated
Depreciation
Expense
Allocated
Accumulated
Depreciation
Allocated
Net Plant
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Incremental Plant - SSU
54 SSU GENERAL OFFICE - ALIGNE PIPE PROJECTS
55 6. GENERAL PLANT
56 399.31 Other Tangible Property - Servers Hardware -$ 8.62% -$ 28,224$ (28,224)$ 717$ 62$ 2,099$ (1,382)$
57 399.32 Other Tangible Property - Servers Software - 8.78% - 70,983 (70,983) 1,890 166 4,900 (3,010)
58 399.38 Other Tangible Property - Application Software 20,937 6.57% 1,376 1,372,532 (1,351,595) 52,168 3,427 103,358 (51,191)
59 Subtotal 20,937$ 1,376$ 1,471,739$ (1,450,802)$ 54,775$ 3,655$ 110,357$ (55,582)$
60
61 TOTAL SSU GENERAL OFFICE 13,040,534$ 1,044,567$ 14,913,136$ (1,872,602)$ 5,331,630$ 422,709$ 5,648,700$ (317,070)$
62
63 SSU CUSTOMER SUPPORT (DIVISION 012)
64 6. GENERAL PLANT
65 389.00 Land and Land Rights -$ 0.00% -$ -$ -$ 7,473$ -$ -$ 7,473$
66 390.00 Structures and Improvements - 3.34% - 417,325 (417,325) 35,131 1,173 229,721 (194,590)
67 390.09 Improvements to Leased Premises 190,875 4.06% 7,750 121,895 68,979 108,477 4,404 69,882 38,595
68 391.00 Office Furniture and Equipment - 4.03% - 120,511 (120,511) 6,944 280 66,928 (59,985)
69 397.00 Communication Equipment - 5.54% - 110,901 (110,901) 4,974 276 62,448 (57,474)
70 398.00 Miscellaneous Equipment 14,075 1.72% 242 2,184 11,890 7,609 131 1,197 6,412
71 399.00 Other Tangible Property - 13.84% - - - - - (401) 401
72 399.01 Other Tangible Property - Servers Hardware 2,210,661 8.62% 190,559 1,113,606 1,097,055 1,197,607 103,234 608,009 589,598
73 399.02 Other Tangible Property - Servers Software - 8.78% - 200,442 (200,442) 5,743 504 110,943 (105,200)
74 399.03 Other Tangible Property - Network Hardware 1,030 8.72% 90 53,747 (52,717) 2,418 211 28,880 (26,462)
75 399.06 Other Tangible Property - PC Hardware 66,715 8.78% 5,858 90,521 (23,806) 37,419 3,285 47,616 (10,197)
76 399.07 Other Tangible Property - PC Software - 6.64% - - - - - (149) 149
77 399.08 Other Tangible Property - Application Software 3,955,006 6.57% 259,844 6,767,642 (2,812,635) 2,351,150 154,471 3,718,110 (1,366,961)
78 Subtotal 6,438,361$ 464,342$ 8,998,774$ (2,560,412)$ 3,764,944$ 267,969$ 4,943,184$ (1,178,240)$
79
IRA-11 Alloc. Incremental Plant Page 2 of 3 188
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Change in
Gross Plant
as of 12/31/22
Depreciation
Rate per GUD
No. 10779
Depreciation
Expense
Accumulated
Depreciation Net Plant (1)
Allocated
Gross Plant
Allocated
Depreciation
Expense
Allocated
Accumulated
Depreciation
Allocated
Net Plant
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Incremental Plant - SSU
80 SSU CUSTOMER SUPPORT - CHARLES K. VAUGHN TRAINING CENTER
81 6. GENERAL PLANT
82 389.10 Land and Land Rights -$ 0.00% -$ -$ -$ (73,421)$ -$ -$ (73,421)$
83 390.10 Structures and Improvements - 3.34% - 402,712 (402,712) (489,883) (16,362) 125,943 (615,826)
84 391.10 Office Furniture and Equipment 41,273 4.03% 1,663 (23,063) 64,336 7,634 308 (21,009) 28,644
85 392.10 Transportation Equipment - 28.96% (27,886) 391 (391) (3,748) (21,114) (3,465) (282)
86 394.10 Tools, Shop, and Garage Equipment 45,590 8.88% 4,048 58,433 (12,843) 9,565 849 32,284 (22,719)
87 395.10 Laboratory Equipment (23,632) 10.00% (2,363) (23,139) (493) (17,894) (1,789) (17,525) (368)
88 397.10 Communication Equipment (259,910) 5.54% (14,399) (270,095) 10,185 (200,146) (11,088) (202,298) 2,152
89 398.10 Miscellaneous Equipment - 1.72% - 13,662 (13,662) (20,923) (360) 3,187 (24,110)
90 399.10 Other Tangible Property (140,469) 13.84% (19,441) (99,767) (40,702) (112,547) (15,576) (80,061) (32,486)
91 399.16 Other Tangible Property - PC Hardware 43,986 8.78% 3,862 (900) 44,886 28,777 2,527 (2,742) 31,519
92 399.17 Other Tangible Property - PC Software - 6.64% - 233 (233) (128) (9) 1,242 (1,371)
93 399.18 Other Tangible Property - Application Software - 15.89% - - - - - 388 (388)
94 Subtotal (293,163)$ (54,515)$ 58,465$ (351,628)$ (872,713)$ (62,615)$ (164,056)$ (708,657)$
95
96 TOTAL SSU CUSTOMER SUPPORT 6,145,199$ 409,827$ 9,057,239$ (2,912,041)$ 2,892,232$ 205,354$ 4,779,129$ (1,886,897)$
97
98 TOTAL SSU GENERAL OFFICE AND CUSTOMER SUPPORT 19,185,733$ 1,454,394$ 23,970,375$ (4,784,643)$ 8,223,862$ 628,062$ 10,427,829$ (2,203,967)$
99
100 Miscellaneous Adjustments - Division 002 - - (185,588) 185,588 - - (75,927) 75,927
101 Adjusted Total 19,185,733$ 1,454,394$ 23,784,787$ (4,599,055)$ 8,223,862$ 628,062$ 10,351,902$ (2,128,040)$
102
103 Note:
104 1. The Allocation Factor is not needed on this schedule. All amounts are the result of IRA-10 minus IRA-9; therefore, no allocation factor is required and the Column reference has been removed.
IRA-11 Alloc. Incremental Plant Page 3 of 3 189
Item 10.
Line
No. Asset No. Project Reason Project Description
FERC Plant
Acct. No.
In
Service Date
Customers
Benefited
(Location)
Customer
Class
Benefited
Total
Project Cost
(a) (b) (c) (d) (e) (f) (g) (h) (i)
11
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Investment Report - Direct Additions Project Report
Please see the current year Project Report found on the flash drive provided at filing and the tabs, "MTX Additions" and "MTX Additions by FERC" for the
direct additions by project and by utility account, respectively.
IRA-12 Direct Additions Report Page 1 of 1
190
Item 10.
Line
No. Asset No. Project Reason Project Description
FERC Plant
Acct. No.
Retirement
Date
Customers
Benefited
(Location)
Customer
Class
Benefited
Total
Project Cost
(a) (b) (c) (d) (e) (f) (g) (h) (i)
11
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Investment Report - Direct Retirements Project Report
Please see the current year Project Report found on the flash drive provided at filing and the tabs, "MTX Retirements" and "MTX Retirements by FERC"
for the direct retirements by project and by utility account, respectively.
IRA-13 Direct Retire Report Page 1 of 1
191
Item 10.
Line
No. Asset No. Project Reason Project Description
FERC Plant
Acct. No.
In
Service Date
Customers
Benefited
(Location)
Customer
Class
Benefited
Total
Project Cost
Allocation
Factor
Allocated
Cost
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k)
11
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Investment Report - Allocated Additions Project Report
Please see the current year Project Report found on the flash drive provided at filing and the tabs, "SSU Additions" and "SSU Additions by FERC" for the allocated additions by
project and by utility account, respectively.
IRA-14 Alloc Add Report Page 1 of 1 192
Item 10.
Line
No. Asset No. Project Reason Project Description
FERC Plant
Acct. No.
Retirement
Date
Customers
Benefited
(Location)
Customer
Class
Benefited
Total
Project Cost
Allocation
Factor
Allocated
Cost
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k)
11
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Investment Report - Allocated Retirements Project Report
Please see the current year Project Report found on the flash drive provided at filing and the tabs, "SSU Retirements" and "SSU Retirements by FERC" for the allocated retirements
by project and by utility account, respectively.
IRA-15 Alloc Retire Report Page 1 of 1 193
Item 10.
Line
No.
FERC
Account No. FERC Account Titles Ref
Additions
Original Cost
Depreciation
Rate per GUD
No. 10779 (1)
Depreciation
Expense (1)
Accumulated
Depreciation (2) Net Plant (2)
(a) (b) (c) (d) (e) (f) (g) (h) (i)
11 1. INTANGIBLE PLANT
12 301.00 Organization -$ 0.00% -$ -$ -$
13 302.00 Franchises and Consents - 0.00% - - -
14 303.00 Miscellaneous Intangible Plant - 0.00% - - -
15 Subtotal -$ -$ -$ -$
16
17 5. DISTRIBUTION PLANT
18 374.01 Land -$ 0.00% -$ -$ -$
19 374.02 Land Rights - 0.98% - - -
20 375.00 Structures and Improvements 5,053 1.71% - - -
21 376.00 Mains - Cathodic Protection 19,200,937 1.85% - - -
22 376.01 Mains - Steel 88,524,617 3.97% - - -
23 376.02 Mains - Plastic 556,239,265 2.21% - - -
24 378.00 M&R Station Equipment 27,796,344 3.09% - - -
25 379.00 City Gate Equipment 227,795 1.88% - - -
26 380.00 Services 267,966,692 3.67% - - -
27 381.00 Meters 33,699,492 3.31% - - -
28 382.00 Meter Installations 58,870,013 3.66% - - -
29 383.00 House Regulators 887,355 3.50% - - -
30 385.00 Industrial M&R Station Equipment 321,243 2.80% - - -
31 Subtotal 1,053,738,806$ -$ -$ -$
32
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Direct Additions Detail
IRA-16 Direct Additions Detail Page 1 of 2 194
Item 10.
Line
No.
FERC
Account No. FERC Account Titles Ref
Additions
Original Cost
Depreciation
Rate per GUD
No. 10779 (1)
Depreciation
Expense (1)
Accumulated
Depreciation (2) Net Plant (2)
(a) (b) (c) (d) (e) (f) (g) (h) (i)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Direct Additions Detail
33 6. GENERAL PLANT
34 389.00 Land and Land Rights -$ 0.00% -$ -$ -$
35 390.00 Structures and Improvements 5,057,921 2.54% - - -
36 390.04 Air Conditioning Equipment 134,246 2.75% - - -
37 391.00 Office Furniture and Equipment 97,632 4.00% - - -
38 392.00 Transportation Equipment - 9.04% - - -
39 393.00 Stores Equipment - 4.00% - - -
40 394.00 Tools, Shop, and Garage Equipment 2,477,151 5.00% - - -
41 395.00 Laboratory Equipment (48,696) 10.00% - - -
42 396.00 Power Operated Equipment - 7.24% - - -
43 397.00 Communication Equipment - 6.67% - - -
44 398.00 Miscellaneous Equipment 43,775 2.50% - - -
45 399.00 Other Tangible Property - 14.29% - - -
46 399.01 Other Tangible Property - Servers Hardware - 14.29% - - -
47 399.02 Other Tangible Property - Servers Software - 14.29% - - -
48 399.03 Other Tangible Property - Network Hardware 377,313 11.11% - - -
49 399.06 Other Tangible Property - PC Hardware 1,968,404 14.29% - - -
50 399.07 Other Tangible Property - PC Software - 14.29% - - -
51 399.08 Other Tangible Property - Application Software - 14.29% - - -
52 Subtotal 10,107,745$ -$ -$ -$
53
54 TOTAL 1,063,846,551$ -$ -$ -$
55 Miscellaneous Adjustments
56 Adjusted Total 1,063,846,551$ -$ -$ -$
57
58 Notes:
59
60 2. The Company does not maintain accumulated depreciation by individual asset. Therefore, the accumulated depreciation in Col (h) and net plant in Col (i) are not available.
1. The Company calculates depreciation expense using group depreciation. Therefore, the depreciation rates in Col (f) are for informational purposes only, and depreciation expense in Col
(g) is not available for individual assets of utility plant.
IRA-16 Direct Additions Detail Page 2 of 2 195
Item 10.
Line
No.
FERC
Account No. FERC Account Titles Ref
Retirements
Original Cost
Depreciation
Rate per GUD
No. 10779 (1)
Depreciation
Expense (1)
Accumulated
Depreciation (2) Net Plant (2)
(a) (b) (c) (d) (e) (f) (g) (h) (i)
11 1. INTANGIBLE PLANT
12 301.00 Organization -$ 0.00% -$ -$ -$
13 302.00 Franchises and Consents - 0.00% - - -
14 303.00 Miscellaneous Intangible Plant - 0.00% - - -
15 Subtotal -$ -$ -$ -$
16
17 5. DISTRIBUTION PLANT
18 374.01 Land -$ 0.00% -$ -$ -$
19 374.02 Land Rights - 0.98% - - -
20 375.00 Structures and Improvements - 1.71% - - -
21 376.00 Mains - Cathodic Protection (138,186) 1.85% - - -
22 376.01 Mains - Steel (29,579,719) 3.97% - - -
23 376.02 Mains - Plastic (5,629,416) 2.21% - - -
24 378.00 M&R Station Equipment (9,512,987) 3.09% - - -
25 379.00 City Gate Equipment - 1.88% - - -
26 380.00 Services (13,116,205) 3.67% - - -
27 381.00 Meters (10,847,361) 3.31% - - -
28 382.00 Meter Installations (4,449,145) 3.66% - - -
29 383.00 House Regulators (2,489,604) 3.50% - - -
30 385.00 Industrial M&R Station Equipment 1,483 2.80% - - -
31 Subtotal (75,761,139)$ -$ -$ -$
32
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Direct Retirement Detail
IRA-17 Direct Retirement Detail Page 1 of 2 196
Item 10.
Line
No.
FERC
Account No. FERC Account Titles Ref
Retirements
Original Cost
Depreciation
Rate per GUD
No. 10779 (1)
Depreciation
Expense (1)
Accumulated
Depreciation (2) Net Plant (2)
(a) (b) (c) (d) (e) (f) (g) (h) (i)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Direct Retirement Detail
33 6. GENERAL PLANT
34 389.00 Land and Land Rights (134,822)$ 0.00% -$ -$ -$
35 390.00 Structures and Improvements (3,038,637) 2.54% - - -
36 390.04 Air Conditioning Equipment (63,681) 2.75% - - -
37 391.00 Office Furniture and Equipment (1,088,937) 4.00% - - -
38 392.00 Transportation Equipment (345,519) 9.04% - - -
39 393.00 Stores Equipment - 4.00% - - -
40 394.00 Tools, Shop, and Garage Equipment (2,433,818) 5.00% - - -
41 395.00 Laboratory Equipment (295,595) 10.00% - - -
42 396.00 Power Operated Equipment - 7.24% - - -
43 397.00 Communication Equipment - 6.67% - - -
44 398.00 Miscellaneous Equipment - 2.50% - - -
45 399.00 Other Tangible Property (29,914) 14.29% - - -
46 399.01 Other Tangible Property - Servers Hardware (63,528) 14.29% - - -
47 399.02 Other Tangible Property - Servers Software (7,694) 14.29% - - -
48 399.03 Other Tangible Property - Network Hardware (136,168) 11.11% - - -
49 399.06 Other Tangible Property - PC Hardware (2,604,010) 14.29% - - -
50 399.07 Other Tangible Property - PC Software (9,216) 14.29% - - -
51 399.08 Other Tangible Property - Application Software (203,719) 14.29% - - -
52 Subtotal (10,455,258)$ -$ -$ -$
53
54 TOTAL (86,216,397)$ -$ -$ -$
55 Miscellaneous Adjustments
56 Adjusted Total (86,216,397)$ -$ -$ -$
57
58 Notes:
59
60 2. The Company does not maintain accumulated depreciation by individual asset. Therefore, the accumulated depreciation in Col (h) and net plant in Col (i) are not available.
1. The Company calculates depreciation expense using group depreciation. Therefore, the depreciation rates in Col (f) are for informational purposes only, and depreciation expense in Col (g) is
not available for individual assets of utility plant.
IRA-17 Direct Retirement Detail Page 2 of 2 197
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Additions
Original Cost
Depreciation
Rate per GUD
No. 10779 (1)
Depreciation
Expense (1)
Accumulated
Depreciation (2) Net Plant (2)
Allocation
Factor
Allocated
Additions
Original Cost
Allocated
Depreciation
Expense (1)
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l)
11 SSU GENERAL OFFICE (DIVISION 002)
12 6. GENERAL PLANT
13 390.00 Structures and Improvements 22,517$ 3.34% -$ -$ -$ 40.09% 9,027$ -$
14 390.09 Improvements to Leased Premises - 4.06% - - - 40.09% - -
15 391.00 Office Furniture and Equipment 129,663 4.03% - - - 40.09% 51,982 -
16 392.00 Transportation Equipment - 28.96% - - - 40.09% - -
17 393.00 Stores Equipment - 10.00% - - - 40.09% - -
18 394.00 Tools, Shop, and Garage Equipment - 8.88% - - - 40.09% - -
19 395.00 Laboratory Equipment - 10.00% - - - 40.09% - -
20 397.00 Communication Equipment 1,829 5.54% - - - 40.09% 733 -
21 398.00 Miscellaneous Equipment - 1.72% - - - 40.09% - -
22 399.00 Other Tangible Property - 13.84% - - - 40.09% - -
23 399.01 Other Tangible Property - Servers Hardware 7,770,830 8.62% - - - 40.09% 3,115,326 -
24 399.02 Other Tangible Property - Servers Software 104,886 8.78% - - - 40.09% 42,049 -
25 399.03 Other Tangible Property - Network Hardware 151,515 8.72% - - - 40.09% 60,742 -
26 399.06 Other Tangible Property - PC Hardware 729,442 8.78% - - - 40.09% 292,433 -
27 399.07 Other Tangible Property - PC Software - 6.64% - - - 40.09% - -
28 399.08 Other Tangible Property - Application Software 4,559,257 6.57% - - - 40.09% 1,827,806 -
29 399.09 Other Tangible Property - Mainframe Software - 6.21% - - - 40.09% - -
30 Subtotal 13,469,938$ -$ -$ -$ 5,400,098$ -$
31
32 SSU GENERAL OFFICE - GREENVILLE DATA CENTER
33 6. GENERAL PLANT
34 390.05 Structures and Improvements (304,536)$ 3.34% -$ -$ -$ 14.18% (43,180)$ -$
35 391.04 Office Furniture and Equipment 11,873 4.03% - - - 14.18% 1,683 -
36 Subtotal (292,663)$ -$ -$ -$ (41,496)$ -$
37
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Additions Detail
IRA-18 Alloc. Additions Detail Page 1 of 4 198
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Additions
Original Cost
Depreciation
Rate per GUD
No. 10779 (1)
Depreciation
Expense (1)
Accumulated
Depreciation (2) Net Plant (2)
Allocation
Factor
Allocated
Additions
Original Cost
Allocated
Depreciation
Expense (1)
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Additions Detail
38 SSU GENERAL OFFICE - DISTRIBUTION AND MARKETING
39 6. GENERAL PLANT
40 390.20 Structures and Improvements -$ 3.34% -$ -$ -$ 51.13% -$ -$
41 390.29 Improvements to Leased Premises - 4.06% - - - 51.13% - -
42 391.20 Office Furniture and Equipment - 4.03% - - - 51.13% - -
43 394.20 Tools, Shop, and Garage Equipment - 8.88% - - - 51.13% - -
44 397.20 Communication Equipment - 5.54% - - - 51.13% - -
45 398.20 Miscellaneous Equipment - 1.72% - - - 51.13% - -
46 399.21 Other Tangible Property - Servers Hardware - 8.62% - - - 51.13% - -
47 399.22 Other Tangible Property - Servers Software (0) 8.78% - - - 51.13% (0) -
48 399.23 Other Tangible Property - Network Hardware - 8.72% - - - 51.13% - -
49 399.26 Other Tangible Property - PC Hardware - 8.78% - - - 51.13% - -
50 399.28 Other Tangible Property - Application Software 0 6.57% - - - 51.13% 0 -
51 Subtotal -$ -$ -$ -$ -$ -$
52
53 SSU GENERAL OFFICE - ALIGNE PIPE PROJECTS
54 6. GENERAL PLANT
55 399.31 Other Tangible Property - Servers Hardware -$ 8.62% -$ -$ -$ 6.13% -$ -$
56 399.32 Other Tangible Property - Servers Software - 8.78% - - - 6.13% - -
57 399.38 Other Tangible Property - Application Software 20,937 6.57% - - - 6.13% 1,284 -
58 Subtotal 20,937$ -$ -$ -$ 1,284$ -$
59
60 TOTAL SSU GENERAL OFFICE 13,198,211$ -$ -$ -$ 5,359,887$ -$
61
62 SSU CUSTOMER SUPPORT (DIVISION 012)
63 6. GENERAL PLANT
64 389.00 Land and Land Rights -$ 0.00% -$ -$ -$ 53.00% -$ -$
65 390.00 Structures and Improvements - 3.34% - - - 53.00% - -
66 390.09 Improvements to Leased Premises 190,875 4.06% - - - 53.00% 101,164 -
67 391.00 Office Furniture and Equipment - 4.03% - - - 53.00% - -
68 397.00 Communication Equipment - 5.54% - - - 53.00% - -
69 398.00 Miscellaneous Equipment 14,075 1.72% - - - 53.00% 7,460 -
70 399.00 Other Tangible Property - 13.84% - - - 53.00% - -
71 399.01 Other Tangible Property - Servers Hardware 2,210,661 8.62% - - - 53.00% 1,171,650 -
72 399.02 Other Tangible Property - Servers Software - 8.78% - - - 53.00% - -
73 399.03 Other Tangible Property - Network Hardware 1,030 8.72% - - - 53.00% 546 -
74 399.06 Other Tangible Property - PC Hardware 66,715 8.78% - - - 53.00% 35,359 -
75 399.07 Other Tangible Property - PC Software - 6.64% - - - 53.00% - -
76 399.08 Other Tangible Property - Application Software 3,955,006 6.57% - - - 53.00% 2,096,153 -
IRA-18 Alloc. Additions Detail Page 2 of 4 199
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Additions
Original Cost
Depreciation
Rate per GUD
No. 10779 (1)
Depreciation
Expense (1)
Accumulated
Depreciation (2) Net Plant (2)
Allocation
Factor
Allocated
Additions
Original Cost
Allocated
Depreciation
Expense (1)
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Additions Detail
77 Subtotal 6,438,361$ -$ -$ -$ 3,412,332$ -$
IRA-18 Alloc. Additions Detail Page 3 of 4 200
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Additions
Original Cost
Depreciation
Rate per GUD
No. 10779 (1)
Depreciation
Expense (1)
Accumulated
Depreciation (2) Net Plant (2)
Allocation
Factor
Allocated
Additions
Original Cost
Allocated
Depreciation
Expense (1)
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Additions Detail
78
79 SSU CUSTOMER SUPPORT - CHARLES K. VAUGHN TRAINING CENTER
80 6. GENERAL PLANT
81 389.10 Land and Land Rights -$ 0.00% -$ -$ -$ 71.83% -$ -$
82 390.10 Structures and Improvements - 3.34% - - - 71.83% - -
83 391.10 Office Furniture and Equipment 89,211 4.03% - - - 71.83% 64,076 -
84 392.10 Transportation Equipment - 28.96% - - - 71.83% - -
85 394.10 Tools, Shop, and Garage Equipment 45,590 8.88% - - - 71.83% 32,745 -
86 395.10 Laboratory Equipment - 10.00% - - - 71.83% - -
87 397.10 Communication Equipment 30,297 5.54% - - - 71.83% 21,761 -
88 398.10 Miscellaneous Equipment - 1.72% - - - 71.83% - -
89 399.10 Other Tangible Property - 13.84% - - - 71.83% - -
90 399.16 Other Tangible Property - PC Hardware 56,025 8.78% - - - 71.83% 40,240 -
91 399.17 Other Tangible Property - PC Software - 6.64% - - - 71.83% - -
92 399.18 Other Tangible Property - Application Software - 15.89% - - - 71.83% - -
93 Subtotal 221,123$ -$ -$ -$ 158,822$ -$
94
95 TOTAL SSU CUSTOMER SUPPORT 6,659,484$ -$ -$ -$ 3,571,154$ -$
96
97 TOTAL SSU GENERAL OFFICE AND CUSTOMER SUPPORT 19,857,696$ -$ -$ -$ 8,931,040$ -$
98
99 Miscellaneous Adjustments
100 Adjusted Total 19,857,696$ -$ -$ -$ 8,931,040$ -$
101
102 Note:
103
104 2. The Company does not maintain accumulated depreciation by individual asset. Therefore, the accumulated depreciation in Col (h) and net plant in Col (i) are not available.
1. The Company calculates depreciation expense using group depreciation. Therefore, the depreciation rates in Col (f) are for informational purposes only, and depreciation expense in Cols. (g) and (l) are not
available for individual assets of utility plant.
IRA-18 Alloc. Additions Detail Page 4 of 4 201
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Retirements
Original Cost
Depreciation
Rate per GUD
No. 10779 (1)
Depreciation
Expense (1)
Accumulated
Depreciation (2) Net Plant (2)
Allocation
Factor
Allocated
Retirements
Original Cost
Allocated
Depreciation
Expense (1)
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l)
11 SSU GENERAL OFFICE (DIVISION 002)
12 6. GENERAL PLANT
13 390.00 Structures and Improvements -$ 3.34% -$ -$ -$ 40.09% -$ -$
14 390.09 Improvements to Leased Premises - 4.06% - - - 40.09% - -
15 391.00 Office Furniture and Equipment - 4.03% - - - 40.09% - -
16 392.00 Transportation Equipment - 28.96% - - - 40.09% - -
17 393.00 Stores Equipment - 10.00% - - - 40.09% - -
18 394.00 Tools, Shop, and Garage Equipment - 8.88% - - - 40.09% - -
19 395.00 Laboratory Equipment - 10.00% - - - 40.09% - -
20 397.00 Communication Equipment - 5.54% - - - 40.09% - -
21 398.00 Miscellaneous Equipment - 1.72% - - - 40.09% - -
22 399.00 Other Tangible Property - 13.84% - - - 40.09% - -
23 399.01 Other Tangible Property - Servers Hardware - 8.62% - - - 40.09% - -
24 399.02 Other Tangible Property - Servers Software - 8.78% - - - 40.09% - -
25 399.03 Other Tangible Property - Network Hardware - 8.72% - - - 40.09% - -
26 399.06 Other Tangible Property - PC Hardware 20,372 8.78% - - - 40.09% 8,167 -
27 399.07 Other Tangible Property - PC Software (1,091,713) 6.64% - - - 40.09% (437,668) -
28 399.08 Other Tangible Property - Application Software 1,071,341 6.57% - - - 40.09% 429,501 -
29 399.09 Other Tangible Property - Mainframe Software - 6.21% - - - 40.09% - -
30 Subtotal -$ -$ -$ -$ -$ -$
31
32 SSU GENERAL OFFICE - GREENVILLE DATA CENTER
33 6. GENERAL PLANT
34 390.05 Structures and Improvements -$ 3.34% -$ -$ -$ 14.18% -$ -$
35 391.04 Office Furniture and Equipment - 4.03% - - - 14.18% - -
36 Subtotal -$ -$ -$ -$ -$ -$
37
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Retirement Detail
IRA-19 Alloc. Retire Detail Page 1 of 4 202
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Retirements
Original Cost
Depreciation
Rate per GUD
No. 10779 (1)
Depreciation
Expense (1)
Accumulated
Depreciation (2) Net Plant (2)
Allocation
Factor
Allocated
Retirements
Original Cost
Allocated
Depreciation
Expense (1)
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Retirement Detail
38 SSU GENERAL OFFICE - DISTRIBUTION AND MARKETING
39 6. GENERAL PLANT
40 390.20 Structures and Improvements -$ 3.34% -$ -$ -$ 51.13% -$ -$
41 390.29 Improvements to Leased Premises - 4.06% - - - 51.13% - -
42 391.20 Office Furniture and Equipment - 4.03% - - - 51.13% - -
43 394.20 Tools, Shop, and Garage Equipment - 8.88% - - - 51.13% - -
44 397.20 Communication Equipment - 5.54% - - - 51.13% - -
45 398.20 Miscellaneous Equipment - 1.72% - - - 51.13% - -
46 399.21 Other Tangible Property - Servers Hardware - 8.62% - - - 51.13% - -
47 399.22 Other Tangible Property - Servers Software - 8.78% - - - 51.13% - -
48 399.23 Other Tangible Property - Network Hardware - 8.72% - - - 51.13% - -
49 399.26 Other Tangible Property - PC Hardware - 8.78% - - - 51.13% - -
50 399.28 Other Tangible Property - Application Software - 6.57% - - - 51.13% - -
51 Subtotal -$ -$ -$ -$ -$ -$
52
53 SSU GENERAL OFFICE - ALIGNE PIPE PROJECTS
54 6. GENERAL PLANT
55 399.31 Other Tangible Property - Servers Hardware -$ 8.62% -$ -$ -$ 6.13% -$ -$
56 399.32 Other Tangible Property - Servers Software - 8.78% - - - 6.13% - -
57 399.38 Other Tangible Property - Application Software - 6.57% - - - 6.13% - -
58 Subtotal -$ -$ -$ -$ -$ -$
59
60 TOTAL SSU GENERAL OFFICE -$ -$ -$ -$ -$ -$
61
IRA-19 Alloc. Retire Detail Page 2 of 4 203
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Retirements
Original Cost
Depreciation
Rate per GUD
No. 10779 (1)
Depreciation
Expense (1)
Accumulated
Depreciation (2) Net Plant (2)
Allocation
Factor
Allocated
Retirements
Original Cost
Allocated
Depreciation
Expense (1)
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Retirement Detail
62 SSU CUSTOMER SUPPORT (DIVISION 012)
63 6. GENERAL PLANT
64 389.00 Land and Land Rights -$ 0.00% -$ -$ -$ 53.00% -$ -$
65 390.00 Structures and Improvements - 3.34% - - - 53.00% - -
66 390.09 Improvements to Leased Premises - 4.06% - - - 53.00% - -
67 391.00 Office Furniture and Equipment - 4.03% - - - 53.00% - -
68 397.00 Communication Equipment - 5.54% - - - 53.00% - -
69 398.00 Miscellaneous Equipment - 1.72% - - - 53.00% - -
70 399.00 Other Tangible Property - 13.84% - - - 53.00% - -
71 399.01 Other Tangible Property - Servers Hardware - 8.62% - - - 53.00% - -
72 399.02 Other Tangible Property - Servers Software - 8.78% - - - 53.00% - -
73 399.03 Other Tangible Property - Network Hardware - 8.72% - - - 53.00% - -
74 399.06 Other Tangible Property - PC Hardware - 8.78% - - - 53.00% - -
75 399.07 Other Tangible Property - PC Software - 6.64% - - - 53.00% - -
76 399.08 Other Tangible Property - Application Software - 6.57% - - - 53.00% - -
77 Subtotal -$ -$ -$ -$ -$ -$
78
IRA-19 Alloc. Retire Detail Page 3 of 4 204
Item 10.
Line
No.
FERC
Account
No. FERC Account Titles Ref
Retirements
Original Cost
Depreciation
Rate per GUD
No. 10779 (1)
Depreciation
Expense (1)
Accumulated
Depreciation (2) Net Plant (2)
Allocation
Factor
Allocated
Retirements
Original Cost
Allocated
Depreciation
Expense (1)
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Allocated Retirement Detail
79 SSU CUSTOMER SUPPORT - CHARLES K. VAUGHN TRAINING CENTER
80 6. GENERAL PLANT
81 389.10 Land and Land Rights -$ 0.00% -$ -$ -$ 71.83% -$ -$
82 390.10 Structures and Improvements - 3.34% - - - 71.83% - -
83 391.10 Office Furniture and Equipment (47,939) 4.03% - - - 71.83% (34,432) -
84 392.10 Transportation Equipment - 28.96% - - - 71.83% - -
85 394.10 Tools, Shop, and Garage Equipment - 8.88% - - - 71.83% - -
86 395.10 Laboratory Equipment (23,632) 10.00% - - - 71.83% (16,974) -
87 397.10 Communication Equipment (290,207) 5.54% - - - 71.83% (208,442) -
88 398.10 Miscellaneous Equipment - 1.72% - - - 71.83% - -
89 399.10 Other Tangible Property (140,469) 13.84% - - - 71.83% (100,892) -
90 399.16 Other Tangible Property - PC Hardware (12,039) 8.78% - - - 71.83% (8,647) -
91 399.17 Other Tangible Property - PC Software - 6.64% - - - 71.83% - -
92 399.18 Other Tangible Property - Application Software - 15.89% - - - 71.83% - -
93 Subtotal (514,286)$ -$ -$ -$ (369,387)$ -$
94
95 TOTAL SSU CUSTOMER SUPPORT (514,286)$ -$ -$ -$ (369,387)$ -$
96
97 TOTAL SSU GENERAL OFFICE AND CUSTOMER SUPPORT (514,286)$ -$ -$ -$ (369,387)$ -$
98
99 Miscellaneous Adjustments
100 Adjusted Total (514,286)$ -$ -$ -$ (369,387)$ -$
101
102 Notes:
103
104 2. The Company does not maintain accumulated depreciation by individual asset. Therefore, the accumulated depreciation in Col (h) and net plant in Col (i) are not available.
1. The Company calculates depreciation expense using group depreciation. Therefore, the depreciation rates in Col (f) are for informational purposes only, and depreciation expense in Cols. (g) and (l) are not available
for individual assets of utility plant.
IRA-19 Alloc. Retire Detail Page 4 of 4 205
Item 10.
Line
No.
(a) (b) (c) (d) (e) (f) (g) (h)
10 Return on Investment
11 Invested Capital (Rate Base) 5,467,281,616$ 6,319,577,780$
12 Rate of Return 7.97% 7.97%
13 Return on Investment 435,578,326$ 503,480,762$
14
15 Interest Expense
16 Invested Capital (Rate Base) 5,467,281,616$ 6,319,577,780$
17 Weighted Cost of Debt 2.07% 2.07%
18 Interest Expense 113,118,057$ 130,752,064$
19
20 After Tax Income 322,460,270$ 372,728,697$
21
22 Gross-up Factor =1+(E26/(1-E26)) 1.27 =1+(H26/(1-H26)) 1.27
23
24 Before Tax Return 408,177,557$ 471,808,478$
25
26 Federal Income Tax Rate 21.00% 21.00%
27
28 Federal Income Tax 85,717,287$ 99,079,780$
29
30 Change in Federal Income Tax 13,362,493$
31
32 Notes:
33
34 2. Invested Capital (Rate Base) Current Year is Balance of Rate Base (Prior Year) plus IRA Change for current year.
35
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Calculation of Federal Income Tax
Description Prior Year Current Year
1. Invested Capital (Rate Base) Prior Year is Balance of Rate Base approved in the 2020 MTX ATM Interim Rate Adjustment
Filing, tab "IRA-20 FIT", Col (g), Line 11.
IRA- 20 FIT Page 1 of 2
206
Item 10.
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Calculation of Federal Income Tax
36
37 Alternative Calculation:
38
39 Calculation
40 (e) (f)
41
42 Cost of Common Equity 151,735,953$ GUD No. 10779, Sch G, Col (c), Ln 4
43 Total Invested Capital 2,572,769,055 GUD No. 10779, Sch G, Col (c), Ln 13
44 Return Rate, per GUD No. 10779 5.898% Ln 42 divided by Ln 43
45 Federal Income Tax Factor 26.58228% (1 /.79) * (.21)
46 Federal Income Tax Adjustment Factor 1.568% Ln 44 times Ln 45
47 Change in Invested Capital - Net Utility Plant 852,296,165$ IRA-5, Col (h), Ln 16
48 Change in Federal Income Tax 13,362,493$ Ln 46 times Ln 47
Description Reference
(b through d) (g through h)
IRA- 20 FIT Page 2 of 2
207
Item 10.
Line
No.Description Beginning Tax Change Current Tax Notes:
(a) (b) (c) (d) (e) (f)
10 Non Revenue - Related
11
12 Ad Valorem Tax 90,325,173$ 19,642,659$ 109,967,832$
13
14 Revenue - Related
15
16 State Gross Receipts - Tax NA NA NA 1
17 Local Gross Receipts - Tax NA NA NA 1
18 Railroad Commission - Gas Utility Tax NA NA NA 1
19
20 Total Revenue Related Taxes -$ -$ -$
21
22
23 TOTAL TAXES OTHER THAN INCOME 90,325,173$ 19,642,659$ 109,967,832$
24
25
26 Ad Valorem Tax Change: Direct
Allocated SSU
General Office
Allocated SSU
Customer Support Total
27 Change in Net Plant (IRA-8 and IRA-11) 855,629,276$ (241,143)$ (1,886,897)$
28 Current Year Ad Valorem Tax Rate % 2.30% 0.79% 0.47%
29 Calculated Ad Valorem Tax Change 19,653,460$ (1,913)$ (8,888)$ 19,642,659$
30
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Ad Valorem and Revenue-related Tax
IRA- 21 Ad Valorem Page 1 of 2
208
Item 10.
Line
No.Description Beginning Tax Change Current Tax Notes:
(a) (b) (c) (d) (e) (f)
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Ad Valorem and Revenue-related Tax
31 Ad Valorem Calculation:
32 Mid-Tex Ad Valorem Tax 73,281,205$ 2022 Ad Valorem Taxes Paid for Mid-Tex Direct Property
33 Capitalized Mid-Tex Ad Valorem Tax (1,587,144) 2022 Ad Valorem Taxes Capital for Mid-Tex
34 Total Mid-Tex Ad Valorem 71,694,061$ Sum of Line 32 through Line 33
35 Mid-Tex Net Plant per GUD No. 10779 3,121,258,952 GUD No. 10779, Sch C, Col (f), Ln 42 minus Sch D, Col (f), Ln 42
36 Mid-Tex Ad Valorem Tax Rate 2.30% Line 34 divided by Line 35
37
38 SSU General Office Ad Valorem Tax 610,064$ 2022 Ad Valorem Taxes Paid for SSU General Office Property
39 Capitalized SSU General Office Ad Valorem Tax - 2022 Ad Valorem Taxes Capital for SSU General Office
40 Total SSU General Office Ad Valorem 610,064$ Sum of Line 38 through Line 39
41 FY23 Allocation Factor 40.09% IRA-5A, Col (d), Line 10
42 Allocated SSU General Office Ad Valorem 244,574$ Line 40 times Line 41
43 SSU General Office Net Plant per GUD No. 10779 30,826,474 GUD No. 10779, Sch C, Col (f), Ln 146 minus Sch D, Col (f), Ln 148
44 SSU General Office Ad Valorem Tax Rate 0.79% Line 42 divided by Line 43
45
46 SSU Customer Support Ad Valorem Tax 505,873$ 2022 Ad Valorem Taxes Paid for SSU Customer Support Property
47 Capitalized SSU Customer Support Ad Valorem Tax - 2022 Ad Valorem Taxes Capital for SSU Customer Support
48 Total SSU Customer Support Ad Valorem 505,873$ Sum of Line 46 through Line 47
49 FY23 Allocation Factor 53.00% IRA-5A, Col (d), Line 18
50 Allocated SSU Customer Support Ad Valorem 268,113$ Line 48 times Line 49
51 SSU Customer Support Net Plant per GUD No. 10779 56,920,406 GUD No. 10779, Sch C, Col (f), Ln 81 minus Sch D, Col (f), Ln 82
52 SSU Customer Support Ad Valorem Tax Rate 0.47% Line 50 divided by Line 51
53
54 Note:
55 1. Amounts are recovered through Rider FF and TAX.
IRA- 21 Ad Valorem Page 2 of 2
209
Item 10.
Line No. IRA Schedule Reference
(a) (b) (c)
11 IRA-21
1
12 IRA-21 2
13 IRA-6 and IRA-7A,
IRA-9 and IRA-10A
3
14
15 IRA-10A 4 The following CY 2018 projects have been removed from this filing:
16
17 MTX SSU
18 080.59985 010.31067
19 010.34108
20
21 IRA-10A 5
22
23
24 010.35374 010.36560
25 010.35380 010.36563
26 010.36182 010.36590
27 010.36193 010.36886
28 010.36542 010.37331
29 010.36550
The following Calendar Year 2020 projects have been removed from this
filing:
SSU
(d)
Column (c) is the amount authorized in most recent rate case or interim
rate adjustment.
This tax is collected through a separate surcharge.
All projects removed in GUD No. 10779 (prior dockets) have been
removed from this filing.
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Footnotes
Comments
IRA-22 Footnotes Page 1 of 1
210
Item 10.
February 17, 2023
Date Signature
Title: Vice President, Rates and Regulatory Affairs
Address: 5420 LBJ Freeway, Suite 1800
Dallas, Texas 75240
Phone: 214.206.2568
Email address:christopher.felan@atmosenergy.com
Alternative contact regarding this report:
Name: Shelly Bass
Title: Associate General Counsel
Address: 5430 LBJ Freeway, Suite 1800
Dallas, Texas 75240-2601
Phone: 972.855.3756
Email address:shelly.bass@atmosenergy.com
I understand that until the issuance of a final order or decision by a regulatory authority in a rate case that is filed after the
implementation of a rate schedule under this section, all amounts collected under the rate schedules before the filing of the rate
case are subject to refund.
Atmos Energy Corp., Mid-Tex Division
Interim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2022
Signature Page
I certify that I am the responsible official of Atmos Energy Corp., Mid-Tex Division; that I have examined the foregoing report;
that to the best of my knowledge, information, and belief, all statements of fact contained in the said report are true and the said
report is a correct statement of the business and affairs of the above-named respondent in respect to each and every matter set
forth therein during the Period Ending December 31, 2022.
IRA-23 Signature Page Page 1 of 1 211
Item 10.
Check one:
This is an original submission [ X ]
This is a revised submission [ ]
Date of submission: February 24, 2023
Twelve Month Period Ending December 31, 2022
ANNUAL EARNINGS MONITORING REPORT
OF
ATMOS ENERGY CORP.
MID-TEX DIVISION
TO THE
ATMOS TEXAS MUNICIPALITIES COALITION ("ATM")
FOR THE
212
Item 10.
Line
No. Description Total Reference
Adjustment
Amount Total Accounts
Increase /
Decrease
Amount Total
(a) (b) (c) (d) (e) (f) (g) (h)
1 Total Operating Revenues 1,553,062,221$ 1, 2 (20,359,222)$ 1,532,702,998$ 3 926,235,775$ 2,458,938,774$
2
3 Operating Expenses:
4 Gas Cost 816,965,570$ -$ 816,965,570$ 627,124,593$ 1,444,090,163$
5 Operation and Maintenance Expenses 188,019,326 1, 2 (5,212,242) 182,807,084 4 73,127,399 255,934,482
6 Depreciation and Amortization Expense 144,321,772 1, 2 - 144,321,772 403 75,509,298 219,831,070
7 Taxes Other Than Income Taxes 139,922,896 (1,261,237) 138,661,660 408.1 74,309,001 212,970,660
8 Interest on Customer Deposits and Advances 117,764 1, 2 - 117,764 431 (113,654) 4,110
9
10 Total Operating Expenses Before Federal
Income Taxes (Sum of Line 4 through 8)1,289,347,328$ 1, 2 (6,473,479)$ 1,282,873,849$ 849,956,636$ 2,132,830,485$
11
12 Total Operating Income Before Federal Income
Taxes (Line 1 - Line 10)263,714,893$ 1, 2 (13,885,744)$ 249,829,149$ 76,279,140$ 326,108,289$
13
14 Federal Income Taxes 47,900,569$ 1, 2, 5 (3,027,199)$ 44,873,370$ (2,166,899)$ 42,706,471$
15
16 Return on Rate Base (Line 12 - Line 14) 215,814,324$ 1, 2 (10,858,544)$ 204,955,779$ 78,446,039$ 283,401,818$
17
18
19 Rate Base 2,573,010,626$ 6 (241,571)$ 2,572,769,055$ 3,359,765,633$ 5,932,534,688$
20 Percent Return on Rate Base - Proposed and
Approved (Cols (b)(e)(h))8.39% 7.97% 7.97%
21 Calculated Allowed Return
(Line 19 * Line 20)204,955,779$ 472,606,458$
22
23 Excess Return (Deficit) (Line 16 - Line 21)(189,204,640)$
24
25 Allowed Rate of Return - GUD No. 10779 Final Order, Finding of Fact 35 7.97%
26 Actual Rate of Return - Year 2022 (Line 16 / Line 19)4.78%
27
ATMOS ENERGY CORP. - MID-TEX DIVISION
ANNUAL EARNINGS MONITORING REPORT
AS OF DECEMBER 31, 2022
At Rates At 12/31/22At Rates At 12/31/17
EMR-1 EMR Summary Page 1 of 2 213
Item 10.
Line
No. Description Total Reference
Adjustment
Amount Total Accounts
Increase /
Decrease
Amount Total
(a) (b) (c) (d) (e) (f) (g) (h)
ATMOS ENERGY CORP. - MID-TEX DIVISION
ANNUAL EARNINGS MONITORING REPORT
AS OF DECEMBER 31, 2022
At Rates At 12/31/22At Rates At 12/31/17
28 Notes:
29
30
31
32
33
34
5. The amount in Column (h) is from EMR-2 Tax, Column (b), Line 16.
6. The amount in Column (h) is from EMR-3 Rate Base, Column (f), Line 24.
1. Column (b) is the Company's Proposed Cost of Service from GUD No. 10779. Column (e) which represents the Cost of Service approved in the Final Order issued in
GUD No. 10779; Column (d) is the calculated adjustment (Column (e) minus Column (b)).
2. Column (h) represents the current year amounts; Column (g) is the calculated adjustment (Column (h) minus Column (e)).
4. The amount includes the following accounts: 870-872, 874, 875, 878-881, 885-889, 891-894, 901-904, 908, 910-913, 920-926, 928, 930.2-932.
3. Column (h), Line 1 includes revenues and unbilled revenues reported in FERC Accounts 480, 481, 487, 488, 489.3, and 495.
EMR-1 EMR Summary Page 2 of 2 214
Item 10.
Line
No. Description Adjusted Amount Reference
(a) (b) (c)
1 Total Revenues 2,458,938,774$ EMR-1, Column (h), Line 1
2
3 Deduct:
4 Gas Cost 1,444,090,163$ EMR-1, Column (h), Line 4
5 Operation and Maintenance Expenses 255,934,482 EMR-1, Column (h), Line 5
6 Depreciation and Amortization Expense 219,831,070 EMR-1, Column (h), Line 6
7 Taxes Other Than Income Taxes 212,970,660 EMR-1, Column (h), Line 7
8 Interest on Customer Deposits and Advances 4,110 EMR-1, Column (h), Line 8
9 Interest Expense 122,744,143 See Note 1
10 Total Deducts 2,255,574,628$ Sum of Lines 4 through 9
11
12 Book Taxable Income 203,364,146$ Line 1 - Line 10
13
14 Tax Rate 21% Statutory Tax Rate
15
16 Total Federal Income Taxes 42,706,471$ Line 12 times Line 14
17
18 Note:
19 1. This amount is calculated by applying the weighted cost of debt to the total rate base (EMR-4, Column (e), Line 1
20 times EMR-4, Column (b), Line 5).
ATMOS ENERGY CORP. - MID-TEX DIVISION
ANNUAL EARNINGS MONITORING REPORT
FEDERAL INCOME TAX SCHEDULE AT END OF REPORTING PERIOD
AS OF DECEMBER 31, 2022
EMR-2 Tax Page 1 of 1 215
Item 10.
Line
No. Description Per Books (1) Ref (2) Adjustments Ref (3) Adjusted Amount
(a)(b) (c) (d) (e) (f)
1 Net Plant in Service
2 Utility Plant in Service 8,664,254,676$ 101 39,424,222$ 3 8,703,678,898$
3 Accum. Provision for Depreciation and Amort. 1,813,245,682 108/111 (77,880,036) 3 1,735,365,645
4 Net Gas Distribution Plant in Service (Line 2 - Line 3)6,851,008,994$ 117,304,259$ 6,968,313,253$
5
6 Additions:
7 Materials & Supplies 16,731,462$ 154/163 (2,191,548)$ 4 14,539,914$
8 Prepayments 30,911,861 165 2,283,902 4 33,195,764
9 Gas Stored Underground 163,161,885 164.1 (163,161,885) 5 -
10 Other - - 6 -
11 Total Additions (Sum of Line 7 through Line 10) 210,805,209$ (163,069,531)$ 47,735,678$
12
13 Deductions:
14 Customer Deposits 10,856,796$ 235 -$ 10,856,796$
15 Customer Advances for Construction 1,000,000 252 - 1,000,000
16 Injuries and Damages Reserve 2,539,887 228.2 - 2,539,887
17 Accum. Deferred Income Taxes 900,813,145 190/282/283 (55,322,612) 7 845,490,532
18 Regulatory Liability 175,181,507 174/186/242/253 - 8 175,181,507
19 Rate Base Adjustments - 21,912,242 9 21,912,242
20 Total Deductions (Sum of Line 14 through Line 19)1,090,391,335$ (33,410,370)$ 1,056,980,965$
21
22 Total Cash Working Capital -$ (26,533,278)$ 10 (26,533,278)$
23
24 Total Rate Base (Line 4 + Line 11 - Line 20 + Line 22)5,971,422,868$ (38,888,180)$ 5,932,534,688$
25
26 Notes:
27 1. Column (c) references the FERC Account numbers associated with the amounts included in Column (b).
28 2. The information listed in Column (e) refers to the footnote explanation of the adjustment shown in Column (d).
29 3. Column (d) includes adjustments for Poly 1 and the Rule 8.209 Regulatory Asset.
30 4. Adjusted to 13 month averages.
31 5. Working Gas in Storage (FERC Account 164.1) moved to Pipeline to reflect GUD No. 9400 Final Order classification for rate purposes.
32 6. Line 10 is an input area for adjustments.
33
34 8. The Regulatory Liability represents the excess deferred income taxes resulting from the revaluation of ADIT due to the Tax Cuts and Jobs Act.
35 9. Adjusted to include the Miscellaneous Adjustment amount for the current period and amounts included in prior dockets.
36 10. The Cash Working Capital is the amount included in the GUD No. 10779 Final Order Model, Schedule B, Column (e), Line 20.
ATMOS ENERGY CORP. - MID-TEX DIVISION
ANNUAL EARNINGS MONITORING REPORT
TOTAL RATE BASE
AS OF DECEMBER 31, 2022
7. Includes an adjustment for the Federal NOL Carryover - Non Reg; Federal NOL Carryover - Other; impact from Winter Storm Uri; and Storage Gas (See
Footnote 5).
EMR-3 Rate Base Page 1 of 1 216
Item 10.
Line
No. Description Balance Percent of Total Cost Weighted Cost
(a) (b) (c) (d) (e) = (c) x (d)
1 Long-Term Debt 2,362,257,764$ 39.82% 5.20% 2.07%
2
3 Common Equity 3,570,276,924 60.18% 9.80% 5.90%
4
5 Total (Line 1 + Line 3) 5,932,534,688$ 100.00% 7.97%
6
7 Notes:
8 1. Column (c) is the approved Capital Structure from GUD No. 10779, Schedule G, Lines 10 and 11.
9 2. Column (d) figures are the approved rates of return from GUD No. 10779, Schedule G, Lines 3 and 4.
ATMOS ENERGY CORP. - MID-TEX DIVISION
ANNUAL EARNINGS MONITORING REPORT
WEIGHTED AVERAGE COST OF CAPITAL
AS OF DECEMBER 31, 2022
EMR-4 Cost of Capital Page 1 of 1
217
Item 10.
February 17, 2023
Date Signature
Title: Vice President, Rates and Regulatory Affairs
Address: 5420 LBJ Freeway, Suite 1800
Dallas, TX 75240
Phone: 214.206.2568
Email address: Christopher.Felan@atmosenergy.com
Alternative contact regarding this report:
Name: Shelly Bass
Title: Associate General Counsel
Address: 5430 LBJ Freeway, Suite 1800
Dallas, Texas 75240-2601
Phone: 972.855.3756
Email address: Shelly.Bass@atmosenergy.com
INTERIM RATE ADJUSTMENT APPLICATION
ATMOS ENERGY CORP. - MID-TEX DIVISION
I certify that I am the responsible official of Atmos Energy Corp., Mid-Tex Division; that I have examined the
foregoing report; that to the best of my knowledge, information, and belief, all statements of fact contained in
the said report are true and the said report is a correct statement of the business and affairs of the above-
named respondent in respect to each and every matter set forth therein during the period from January 1, 2022
to December 31, 2022 inclusive.
I understand until the issuance of a final order or decision by a regulatory authority in a rate case that is filed
after the implementation of a tariff or rate schedule under this section, all amounts collected under the tariff or
rate schedule before the filing of the rate case are subject to refund.
EMR-5 Signature Page Page 1 of 1
218
Item 10.
ATMOS ENERGY CORP.,
MID-TEX DIVISION
INTERIM RATE ADJUSTMENT
APPLICATION
PROJECT REPORT 2022
ADDITIONS
219
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
MID-TEX ADDITIONS
1 080.33345 0
NORTH REGION, NORTHEAST AREA OPERATIONS BLANKET FOR REPLACE/RETIRE
SERVICE LINES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER
2 080.33346 0
NORTH REGION, NORTHWEST AREA OPERATIONS BLANKET FOR REPLACE/RETIRE
SERVICE LINES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER
3 080.33347 873
SOUTHEAST REGION, DALLAS AREA OPERATIONS BLANKET FOR REPLACE/RETIRE
SERVICE LINES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4 080.33348 1
SOUTHEAST REGION, EAST AREA OPERATIONS BLANKET FOR REPLACE/RETIRE
SERVICE LINES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
5 080.33349 0
SOUTHEAST REGION, SOUTH AREA OPERATIONS BLANKET FOR REPLACE/RETIRE
SERVICE LINES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER
6 080.33350 0
SOUTHWEST REGION, FT. WORTH AREA OPERATIONS BLANKET FOR
REPLACE/RETIRE SERVICE LINES DUE TO HIGH RISK DETERMINATION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
7 080.33351 0
SOUTHWEST REGION, SOUTH AREA OPERATIONS BLANKET FOR REPLACE/RETIRE
SERVICE LINES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY SEPTEMBER
8 080.33352 0
SOUTHWEST REGION, WEST AREA OPERATIONS BLANKET FOR REPLACE/RETIRE
SERVICE LINES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
9 080.33353 0
NORTH REGION, NORTHEAST AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO
250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER
10 080.33354 0
NORTH REGION, NORTHWEST AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO
250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER
11 080.33355 0
SOUTHEAST REGION, DALLAS AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO
250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
12 080.33356 0
SOUTHEAST REGION, EAST AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO 250
FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
13 080.33357 0
SOUTHEAST REGION, SOUTH AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO
250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER
14 080.33358 63
SOUTHWEST REGION, FT. WORTH AREA OPERATIONS BLANKET FOR PIPE 5 FEET
TO 250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
15 080.33359 0
SOUTHWEST REGION, SOUTH AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO
250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY SEPTEMBER
16 080.33360 0
SOUTHWEST REGION, WEST AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO
250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
17 080.33487 826
INSTALL 500 FEET OF 8 INCH POLY ALONG HIGHWAY 83-84 AND ABANDON 500
FEET OF 10 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
18 080.33492 236
INSTALL 1950 FEET OF 2 INCH POLY ALONG BENSON STREET AND ABANDON 1950
FEET OF 2 INCH POLY AND 122 FEET OF 2 INCH STEEL DUE TO HIGH RISK
DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WINGATE SYSTEM INTEGRITY OCTOBER
19 080.33502 234
INSTALL 375 FEET OF 6 INCH POLY ALONG RICHLAND DRIVE AND ABANDON 375
FEET OF 6 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
20 080.33506 98
ABANDON 772 FEET OF 4 INCH STEEL IN AN ALLEY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER
21 080.33507 133
INSTALL 480 FEET OF 2 INCH POLY AT SOUNDOWN AND CALVERT STREETS AND
ABANDON 1250 FEET OF 10 INCH STEEL AND 507 FEET OF 4 INCH AND 212 FEET OF
2 INCH POLY DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER
22 080.33513 16
INSTALL 433 FEET OF 2 INCH POLY ALONG AVENUE G AND ABANDON 433 FEET OF
1.25 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY SYSTEM INTEGRITY OCTOBER
23 080.33519 6
INSTALL 331 FEET OF 2 INCH POLY IN AN ALLEY N OF 19TH STREET AND ABANDON
331 FEET OF 2 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ANSON SYSTEM INTEGRITY OCTOBER
24 080.33520 253
ABANDON 297 FEET OF 3 INCH STEEL ALONG ELM STREET IN ACCORDANCE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLOOMING GROVE SYSTEM INTEGRITY OCTOBER
25 080.33546 379
INSTALL 550 FEET OF 4 INCH POLY ALONG AVENUE B AND 14TH STREET AND
ABANDON 162 FEET OF 4 INCH, 342 FEET OF 3 INCH AND 1290 FEET OF 2 INCH
STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY OCTOBER
26 080.33548 178
INSTALL 288 FEET OF 2 INCH POLY IN AN ALLEY EAST OF WILLIS AND ABANDON
288 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
27 080.33561 2,995
INSTALL 600 FEET OF 12 INCH STEEL ALONG 23RD STREET AND ABANDON 540
FEET OF 12 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
28 080.33604 349
INSTALL 197 FEET OF 4 INCH AND 263 FEET OF 2 INCH POLY ALONG MURRAY
STREET AND COULTER STREET AND ABANDON 153 FEET OF 4 INCH AND 209 FEET
OF 3 INCH STEEL AND 11 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ROCKDALE SYSTEM INTEGRITY OCTOBER
29 080.33654 368
INSTALL 260 FEET OF 4 INCH POLY ALONG 21ST STREET AND ABANDON 260 FEET
OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
30 080.33662 16
INSTALL 147 FEET OF 2 INCH POLY ALONG ELIZABETH STREET AND ABANDON 147
FEET OF 2 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
31 080.33663 15
INSTALL 400 FEET OF 6 INCH POLY ALONG 10TH STREET AND ABANDON 400 FEET
OF 10 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
32 080.33676 105
INSTALL 199 FEET OF 4 INCH POLY IN AN ALLEY AND ABANDON 199 FEET OF 4
INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY OCTOBER
33 080.33726 286
INSTALL 328 FEET OF 4 INCH AND 218 FEET OF 2 INCH POLY ALONG HILLYER
STREET AND COULTER STREET AND ABANDON 310 FEET OF 3 INCH AND 216 FEET
OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKDALE SYSTEM INTEGRITY OCTOBER
34 080.33733 78
INSTALL 215 FEET OF 2 INCH POLY ALONG PEAR STREET AND ABANDON 200 FEET
OF 3 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
35 080.33734 78
INSTALL 315 FEET OF 2 INCH POLY ALONG FM 381 AND ABANDON 300 FEET OF 2
INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 1 of 178
220
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
36 080.33735 65
INSTALL 215 FEET OF 4 INCH POLY ALONG EAST 33RD STREET AND ABANDON 200
FEET OF 3 INCH BARE STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
37 080.33742 818
INSTALL 1135 FEET OF 2 INCH POLY AND ABANDON 1132 FEET OF 2 INCH STEEL
DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUITMAN SYSTEM INTEGRITY OCTOBER
38 080.33746 22
INSTALL 151 FEET OF 4 INCH POLY IN AN ALLEY AND ABANDON 151 FEET OF 4
INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER
39 080.33776 60
INSTALL 850 FEET OF 4 INCH POLY ALONG CLARKSVILLE STREET AND ABANDON
850 FEET OF 3 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER
40 080.33798 597
INSTALL 10 FEET OF 10 INCH STEEL ALONG EDGEWOOD STREET AND ABANDON
10 FEET OF 10 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
41 080.33801 24
INSTALL 130 FEET OF 2 INCH POLY ALONG PEARL STREET AND ABANDON 128
FEET OF 2 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
42 080.33840 29
INSTALL 470 FEET OF 2 INCH POLY ALONG 8TH STREET AND ABANDON 470 FEET
ON 1.75 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEGARGEL SYSTEM INTEGRITY OCTOBER
43 080.33842 377
INSTALL 150 FEET OF 4 INCH POLY IN MYRTLE STREET AND ABANDON 150 FEET
OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER
44 080.33844 129
INSTALL 182 FEET OF 2 INCH POLY ALONG US HIGHWAY 380 AND ABANDON 182
FEET OF 3 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY OCTOBER
45 080.33849 311
ABANDON 130 FEET OF 2 INCH STEEL ALONG GRACE STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
46 080.33870 40
INSTALL 118 FEET OF 4 INCH POLY ALONG 11TH STREET AND ABANDON 110 FEET
OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
47 080.33900 291
INSTALL 360 FEET OF 4 INCH POLY IN AN ALLEY AND ABANDON 360 FEET OF 4
INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY OCTOBER
48 080.33906 18
INSTALL 229 FEET OF 2 INCH POLY ALONG COLQUITT STREET AND ABANDON 246
FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
49 080.33907 216
INSTALL 325 FEET OF 2 INCH POLY ON LOOP 254 AND ABANDON 325 FEET OF 2
INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER SYSTEM INTEGRITY OCTOBER
50 080.33909 345
INSTALL 400 FEET OF 2 INCH POLY ALONG LOOP 3363 AND ABANDON 400 FEET OF
2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLDEN SYSTEM INTEGRITY OCTOBER
51 080.33951 119
INSTALL 545 FEET OF 2 INCH POLY ALONG MILLS STREET AND ABANDON 975 FEET
OF 3 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HUTCHINS SYSTEM INTEGRITY OCTOBER
52 080.33979 283
INSTALL 200 FEET OF 4 INCH POLY ALONG 9TH STREET AND ABANDON 200 FEET
OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY OCTOBER
53 080.33981 32
INSTALL 265 FEET OF 4 INCH POLY IN AN ALLEY EAST OF ELM STREET AND
ABANDON 265 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
54 080.34037 113
INSTALL 230 FEET OF 2 INCH POLY ON EAST HOUSTON STREET AND ABANDON
230 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COOPER SYSTEM INTEGRITY OCTOBER
55 080.34048 17
INSTALL 165 FEET OF 6 INCH AND 117 FEET OF 3 INCH POLY ALONG AMBLER
AVENUE AND ABANDON 165 FEET OF 6 INCH AND 117 FEET OF 3 INCH STEEL DUE
TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
56 080.34070 85
INSTALL 145 FT OF 4 INCH POLY AT METCALF AND HIGHLAND AND ABANDON 145
FT OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
57 080.34087 70
INSTALL 100 FEET OF 4 INCH POLY IN A PUBLIC UTILITY EASEMENT AND ABANDON
100 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY OCTOBER
58 080.34091 295
INSTALL 90 FEET OF 6 INCH AND 32 FEET OF 4 INCH POLY AT THE INTERSECTION
OF 20TH STREET AND 11TH AVENUE AND ABANDON 90 FEET OF 6 INCH AND 32
FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
59 080.34136 67
INSTALL 143 FT OF 2 IN POLY ON STRATFORD AND ABANDON 150 FEET OF 1.25
INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
60 080.34137 21
INSTALL 185 FEET OF 2 INCH POLY AT BANK AND PENN STREETS AND ABANDON
110 FEET OF 3 INCH AND 75 FEET OF 2 STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY OCTOBER
61 080.34143 380
INSTALL 1040 FEET OF 4 INCH POLY IN AN ALLEY AND ABANDON 905 FEET OF 3
INCH CAST IRON, 121 FEET OF 3 INCH AND 15 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
62 080.34146 273
INSTALL 237 FEET OF 2 INCH POLY ALONG 2ND STREET AND ABANDON 235 FEET
OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY OCTOBER
63 080.34175 332
INSTALL 155 FEET OF 3 INCH POLY ALONG MCCRACKEN STREET AND ABANDON
155 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CHICO SYSTEM INTEGRITY OCTOBER
64 080.34176 159
INSTALL 300 FEET OF 2 INCH STEEL ALONG ELM STREET AND ABANDON 300 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ALVORD SYSTEM INTEGRITY OCTOBER
65 080.34177 628
INSTALL 625 FEET OF 2 INCH POLY ALONG SEALY STREET AND ABANDON 625
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS JUSTIN SYSTEM INTEGRITY OCTOBER
66 080.34187 286
INSTALL 1220 FEET OF 4 INCH POLY ALONG VARIOUS STREETS AND ABANDON
1850 FEET OF 4 INCH AND 125 FEET OF 3 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALVERT SYSTEM INTEGRITY OCTOBER
67 080.34188 1,407
INSTALL 2100 FEET OF 4 INCH POLY IN ALLEY BETWEEN NORTH ELM AND NORTH
CRUMP AND ABANDON 2100 FEET OF 2.5 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
68 080.34208 680
INSTALL 800 FEET OF 4 INCH POLY ALONG 15TH STREET AND ABANDON 800 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS HONEY GROVE SYSTEM INTEGRITY OCTOBER
69 080.34210 239
INSTALL 305 FEET OF 2 INCH POLY ALONG NORTH REAGAN STREET AND
ABANDON 456 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST SYSTEM INTEGRITY OCTOBER
70 080.34228 583
INSTALL 710 FEET OF 2 INCH POLY AND ABANDON 710 FEET OF 4 INCH OF STEEL
PIPE DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORNEY SYSTEM INTEGRITY OCTOBER
71 080.34251 73
INSTALL 50 FEET OF 4 INCH POLY ALONG MILLS STREET AND ABANDON 50 FEET
OF 3 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
72 080.34286 151
INSTALL 356 FEET OF 2IN POLY IN THE ALLEY NORTH OF FOURTH ST AT AVE E
AND ABANDON 356 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS KNOX CITY SYSTEM INTEGRITY OCTOBER
73 080.34294 786
INSTALL 1350 FEET OF 2 INCH POLY IN AN ALLEY AND ABANDON 1350 FEET OF 2
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 2 of 178
221
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
74 080.34320 33
INSTALL 460 FT OF 2 IN POLY AT WENONAH AND SEYMOUR AND ABANDON 360
FEET OF 4 INCH STEEL AND 50 FEET OF 4 INCH AND 50 FEET OF 2 INCH POLY DUE
TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
75 080.34326 210
ABANDON 40 FEET OF 2 INCH STEEL ALONG EDDIE STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER
76 080.34395 109
INSTALL 485 FEET OF 2 INCH POLY ALONG 2ND STREET AND ABANDON 485 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS BAIRD SYSTEM INTEGRITY OCTOBER
77 080.34402 206
ABANDON 932 FEET OF 2 INCH STEEL IN AN EASEMENT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY OCTOBER
78 080.34403 151
ABANDON 203 FEET OF 2 INCH STEEL ALONG ADAMS STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STRAWN SYSTEM INTEGRITY OCTOBER
79 080.34417 240
INSTALL 215 FEET OF 2 INCH POLY ALONG NORTHWEST HIGHWAY AND ABANDON
2OO FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
80 080.34432 305
INSTALL 160 FEET OF 2 INCH POLY ALONG ANDERSON STREET AND ABANDON 950
FEET OF 2 INCH CAST IRON DUE TO HIGH RISK DETERMINATION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
81 080.34470 82
INSTALL 288 FEET OF 2 INCH POLY ALONG HILL ST AND ABANDON 288 FEET OF 2
INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY SYSTEM INTEGRITY OCTOBER
82 080.34491 96
INSTALL 5 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY IN AN ALLEY AND
ABANDON 5 FEET OF 4 INCH AND 10 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY OCTOBER
83 080.34502 562
INSTALL 1250 FEET OF 2 INCH POLY ALONG EAST PARK AND ABANDON 1250 FEET
OF 24 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
84 080.34508 65
INSTALL 30 FEET OF 8 INCH POLY ALONG BROTHERS BLVD AND ABANDON 12
FEET OF 8 INCH STEEL AND 18 FEET OF 8 INCH POLY DUE TO HIGH RISK
DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY OCTOBER
85 080.34520 498
INSTALL 270 FEET OF 4 INCH POLY ALONG WALNUT AND NEW STREETS AND
ABANDON 254 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
86 080.34532 31
INSTALL 1240 FEET OF 2 INCH POLY IN AN ALLEY AND ABANDON 1240 FEET OF 2
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
87 080.34543 73
INSTALL 450 FEET OF 2 INCH POLY ALONG 6TH STREET AND ABANDON 450 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS NORMANGEE SYSTEM INTEGRITY OCTOBER
88 080.34555 128
INSTALL 265 FEET OF 2 INCH POLY ALONG13TH STREET AND ABANDON 265 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS HASKELL SYSTEM INTEGRITY OCTOBER
89 080.34560 617
INSTALL 1260 FEET OF 2 INCH POLY ALONG 24TH STREET AND ABANDON 1255
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
90 080.34562 204
INSTALL 405 FEET OF 2 INCH POLY ALONG 3RD STREET AND ABANDON 405 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
91 080.34579 360
INSTALL 428 FEET OF 6 INCH, 23 FEET OF 3 INCH AND 16 FEET OF 2 INCH POLY
ALONG 23RD STREET AND ABANDON 428 FEET OF 6 INCH, 23 FEET OF 3 INCH AND
16 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER
92 080.34704 12
INSTALL 142 FEET OF 3 INCH POLY ALONG 7TH AND ABANDON 142 FEET OF 3 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
93 080.34729 53
INSTALL 150 FEET OF 4 INCH POLY ALONG COLORADO STREET AND ABANDON 150
FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY OCTOBER
94 080.34737 672
INSTALL 100 FEET OF 6 INCH POLY ALONG JEFFERSON STREET AND ABANDON
100 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY OCTOBER
95 080.34741 9
INSTALL 315 FEET OF 4 INCH POLY IN AN ALLEY AND ABANDON 315 FEET OF 3
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY OCTOBER
96 080.34745 108
INSTALL 107 FEET OF 4 INCH POLY IN AN ALLEY AND ABANDON 107 FEET OF 4
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
97 080.34747 153
INSTALL 120 FEET OF 2 INCH POLY ALONG COUNTRY CLUB ROAD AND ABANDON
70 FEET OF 2 INCH STEEL AND 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
98 080.34753 112
ABANDON 256 FEET OF 2 INCH STEEL AT 5TH AND BROWN IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURKBURNETT SYSTEM INTEGRITY OCTOBER
99 080.34776 7
INSTALL 175 FEET OF 2 INCH POLY ALONG WILDWOOD STREET AND ABANDON 175
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY OCTOBER
100 080.34785 82
INSTALL 250 FEET OF 2 INCH POLY ALONG TELLERSON AND ABANDON 1570 FEET
OF 1,25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
101 080.34862 138
INSTALL 488 FEET OF 1.25 INCH POLY ALONG CR 357 AND ABANDON 476 FEET OF
1 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS BLANKET SYSTEM INTEGRITY OCTOBER
102 080.34866 123
INSTALL 339 FEET OF 2 INCH POLY AND ABANDON 317 FEET OF 1 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLANKET SYSTEM INTEGRITY OCTOBER
103 080.34881 307
INSTALL 300 FEET OF 6 INCH POLY ALONG 28TH STREET AND ABANDON 300 FEET
OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
104 080.34960 166
ABANDON 95 FEET OF 2 INCH STEEL ALONG BROWNING STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEYMOUR SYSTEM INTEGRITY OCTOBER
105 080.34982 185
INSTALL 397 FEET OF 2 INCH POLY IN AN ALLEY AND ABANDON 397 FEET OF 2
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
106 080.34994 590
INSTALL 200 FEET OF 4 INCH AND 120 FEET OF 2 INCH POLY IN AN ALLEY AND
ABANDON 200 FEET OF 4 INCH AND 120 FEET OF 2 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY OCTOBER
107 080.34998 134
INSTALL 51 FEET OF 2 INCH POLY AT HACKBERRY AND 20TH STREET AND
ABANDON 920 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
108 080.35032 219
INSTALL 150 FEET OF 4 INCH POLY ALONG BALCH SPRINGS ROAD AND ABANDON
150 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY OCTOBER
109 080.35156 82
INSTALL 148 FEET OF 2 INCH POLY AND ABANDON 148 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER
110 080.35164 53
INSTALL 275 FEET OF 2 INCH POLY IN AN ALLEY AND ABANDON 275 FEET OF 2
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANSON SYSTEM INTEGRITY OCTOBER
111 080.35180 5
ABANDON 425 FEET OF 4 INCH STEEL ALONG BURNETT STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALVERT SYSTEM INTEGRITY OCTOBER
112 080.35242 20
INSTALL 334 FEET OF 2 INCH POLY ALONG BROYLES AND ABANDON 334 FEET OF
3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS BURKBURNETT SYSTEM INTEGRITY OCTOBER
113 080.35255 62
INSTALL 1071 FEET OF 1.25 INCH POLY ALONG CR 357 AND ABANDON 1071 FEET
OF 1 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS BLANKET SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 3 of 178
222
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
114 080.38117 0
INSTALL 1235 FEET OF 4 INCH AND 65 FEET OF 2 INCH POLY NEAR RUTH LANE
AND ABANDON 1235 FEET OF 4 INCH AND 65 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
115 080.41066 2,558
INSTALL 8100 FEET OF 24 INCH STEEL ALONG IRVING BOULEVARD AND ABANDON
8100 FEET OF 24 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER
116 080.41157 (312)
INSTALL 249 POLY SERVICE LINES IN THE SOUTHWEST REGION, FT. WORTH AREA
AND ABANDON 249 STEEL SERVICE LINES IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
117 080.41874 0
RELOCATE FACILITIES. INSTALL 30 FEET OF 6 INCH STEEL, 1465 FEET OF 8 INCH,
397 FEET OF 4 INCH AND 186 FEET OF 2 INCH POLY AND ABANDON 1460 FEET OF 6
INCH, 850 FEET OF 4 INCH, AND 430 FEET OF 2 INCH STEEL TO ACCOMMODATE
CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES SEPTEMBER
118 080.43732 170
INSTALL 1228 FEET OF POLY ALONG PIERCE AND ABANDON 1228 FEET STEEL AND
72 FEET OF POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY OCTOBER
119 080.45245 0
INSTALL 1720 FEET OF 2 INCH POLY ALONG WORTH STREET AND ABANDON 1720
FEET OF 4 INCH AND 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
120 080.45509 (0)
INSTALL 800 FEET OF 12 INCH POLY ALONG FM 1417 AND ABANDON 800 FEET OF
12 INCH STEEL ALONG FM 1417 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER
121 080.45614 0
INSTALL 1650 FEET OF 2 INCH POLY ALONG VICTOR STREET AND ABANDON 1650
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
122 080.45638 (46,996)
RELOCATE FACILITIES. INSTALL 41 FEET OF 6 INCH, 37 FEET OF 8 INCH, 30 FEET
OF 10 INCH AND 4409 FEET OF 16 INCH STEEL AND ABANDON 237 FEET OF 6 INCH,
787 FEET OF 8 INCH, 30 FEET OF 10 INCH, 170 FEET OF 12 INCH AND 3396 FEET OF
16 INCH STEEL ALONG EAST AVENUE H TO ACCOMMODATE TXDOT STREET
PROJECT. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES MAY
123 080.45658 2
INSTALL 1227 FEET OF 12 INCH STEEL, 80 FEET OF 2 INCH AND 284 FEET OF 4 INCH
POLY ALONG LIVE OAK AND ABANDON 61 FEET OF 2 INCH, 1281 FEET OF 12 INCH
STEEL, 300 FEET OF 3 INCH AND 162 FEET OF 4 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
124 080.45700 2
INSTALL 335 FEET OF 6 INCH AND 425 FEET OF 4 INCH POLY ALONG GLENCO
TERRACE AND ABANDON 169 FEET OF 3 INCH POLY, 256 FEET OF 4 INCH CAST
IRON, AND 335 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
125 080.46065 1
INSTALL 1000 FEET OF 2 INCH POLY ALONG WINDSOR PARKWAY AND ABANDON
1000 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER
126 080.46146 5
RELOCATE FACILITIES. INSTALL 125 FEET OF 6 INCH, 250 FEET OF 4 INCH, 2920
FEET OF 2 INCH POLY ALONG YEWPON AND ABANDON 90 FEET OF 6 INCH, 215
FEET OF 4 INCH, 2700 FEET OF 2 INCH STEEL AND 120 FEET OF 2 INCH POLY TO
ACCOMMODATE THE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
127 080.46447 5,766
INSTALL 3500 FEET OF 24 INCH STEEL ALONG SH114 AND ABANDON 3500 FEET OF
24 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER
128 080.47046 11,979
RELOCATE FACILITIES. INSTALL 248 FEET OF 2 INCH POLY AND 351 FEET OF 4
INCH POLY AND 5045 FEET OF 6 INCH POLY AND ABANDON 294 FEET OF 2 INCH
POLY AND 3474 FEET OF 4 INCH STEEL AND 1847 FEET OF 4 INCH POLY ALONG
WHITE CHAPEL BOULEVARD TO ACCOMMODATE CITY OF SOUTHLAKE STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE
RELOCATION OF
FACILITIES OCTOBER
129 080.47061 0
RELOCATE FACILITIES. INSTALL 2600 FEET OF 12 INCH STEEL, 75 FEET OF 6 INCH,
250 FEET OF 4 INCH, AND 100 FEET OF 2 INCH POLY ALONG MONTGOMERY
STREET AND ABANDON 104 FEET OF 2 INCH AND 64 FEET OF 4 INCH POLY AND
2623 FEET OF 12 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
130 080.47079 0
INSTALL 1700 FEET OF 2 INCH POLY ALONG TARPLEY AVENUE AND ABANDON
1200 FEET OF 3 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS COCKRELL HILL SYSTEM INTEGRITY SEPTEMBER
131 080.47303 0
RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH AND 2230 FEET OF 2 INCH
POLY ALONG SAN JACINTO AND ABANDON 470 FEET OF 6 INCH AND 2260 FEET OF
4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
132 080.47311 97
RELOCATE FACILITIES. INSTALL 3630 FEET OF 2 INCH POLY ALONG ROYALTON
AND ABANDON 3625 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DALLAS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
133 080.47445 6
RELOCATE FACILITIES. INSTALL 220 FEET OF 4 INCH AND 1930 FEET OF 2 INCH
POLY ALONG NECHES AND ABANDON 645 FEET OF 4 INCH POLY AND 1350 FEET OF
4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS IMPROVEMENT PROJECT
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
134 080.47446 0
RELOCATE FACILITIES. INSTALL 1985 FEET OF 4 INCH AND 1950 FEET OF 2 INCH
POLY ALONG EWING AND ABANDON 1410 FEET OF 6 INCH STEEL, 420 FEET OF 8
INCH CAST IRON, 40 FEET OF 4 INCH CAST IRON, AND 155 FEET OF 6 INCH POLY TO
ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
135 080.47600 54
INSTALL 1050 FEET OF 2 INCH POLY ALONG ASH AVENUE AND ABANDON 1050
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
136 080.47601 8
INSTALL 1900 FEET OF 2 INCH POLY AND ABANDON 1900 FEET OF 4 INCH CAST
IRON ALONG HENDERSON AVENUE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
137 080.47603 54
INSTALL 1588 FEET OF 2 INCH POLY ALONG HENDERSON AVENUE AND ABANDON
1536 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
138 080.47605 43
INSTALL 1150 FEET OF 2 INCH POLY ALONG HENDERSON AVENUE AND ABANDON
1150 FEET OF CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
139 080.47606 69
INSTALL 800 FEET OF 2 INCH POLY ALONG HENDERSON AVENUE AND ABANDON
875 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
140 080.47607 293
ABANDON 3200 FEET OF 6 AND 8 INCH CAST IRON ALONG HENDERSON AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
141 080.47681 31
INSTALL 1136 FEET OF 2 INCH POLY ALONG ASH AND ABANDON 1245 FEET OF 4
INCH AND 375 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
142 080.47682 63
INSTALL 2200 FEET OF 2 INCH POLY ALONG TERRY AND ABANDON 3550 FEET OF 4
INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
143 080.47848 2
INSTALL 1450 FEET OF 2 INCH POLY ALONG BROOKLYNDELL STREET AND
ABANDON 1030 FEET OF 2 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
144 080.47850 2
INSTALL 1850 FEET OF 2 INCH POLY ALONG BARNETT AVENUE AND ABANDON 650
FEET OF 4 INCH AND 1200 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 4 of 178
223
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
145 080.47857 4
INSTALL 1500 FEET OF 2 INCH POLY ALONG MARSHALL DELL AVENUE AND
ABANDON 1200 FEET OF CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
146 080.47894 (67)
INSTALL 5 GRADIENT CONTROL MATS, 2000 FEET OF ZINC RIBBON, 10 TEST
STATIONS AND 2 DEEP GROUNDING POINTS TO PROVIDE ADEQUATE CATHODIC
PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY OCTOBER
147 080.48010 0
INSTALL 450 FEET OF 2 INCH POLY ALONG JETER STREET AND ABANDON 50 FEET
OF 2 INCH AND 380 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MABANK SYSTEM INTEGRITY SEPTEMBER
148 080.48093 360,820
INSTALL 20842 FEET OF 8 INCH AND 27 FEET OF 4 INCH POLY ALONG COUNTY
ROAD 269 DUE TO CUSTOMER GROWTH. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LEANDER GROWTH SEPTEMBER
149 080.48110 1
INSTALL DISTRICT REGULATOR STATION AND 4800 FEET OF 12 INCH STEEL ALONG
BALLARD DRIVE AND ABANDON DISTRICT REGULATOR STATION AND 4800 FEET OF
3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WYLIE SYSTEM INTEGRITY SEPTEMBER
150 080.48519 1
RELOCATE FACILITIES. INSTALL 3080 FEET OF 4 INCH AND 150 FEET OF 2 INCH
POLY ALONG MERIDA AND ABANDON 2915 FEET OF 4 INCH CAST IRON TO
ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
151 080.48572 0
RELOCATE FACILITIES. INSTALL 1920 FEET OF 2 INCH POLY ALONG AIRLINE
STREET AND ABANDON 1830 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY
OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
152 080.48583 0
RELOCATE FACILITIES. INSTALL 200 FEET OF 8 INCH AND 250 FEET OF 2 INCH
POLY ALONG LAURENCE DRIVE AND ABANDON 190 FEET OF 3 INCH STEEL TO
ACCOMMODATE TXDOT ROAD AND DRAINAGE IMPROVEMENTS PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEATH
RELOCATION OF
FACILITIES SEPTEMBER
153 080.48651 0
INSTALL 1000 FEET OF 4 INCH POLY ALONG WASHINGTON AND ABANDON 900 FEET
OF 4 INCH CAST IRON AND 20 FEET OF 6 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
154 080.48677 0
RELOCATE FACILITIES. INSTALL 1685 FEET OF 6 INCH 250 FEET OF 4 INCH 660
FEET OF 2 INCH POLY ALONG DEVITT STREET AND ABANDON 1430 FEET OF 6 INCH
CAST IRON TO ACCOMMODATE FORT WORTH ROADWAY PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
155 080.48741 0
RELOCATE FACILITIES. INSTALL 1600 FEET OF 4 INCH POLY ALONG UNIVERSITY
AND ABANDON 2525 FEET OF 6 INCH CAST IRON AND 1250 FEET OF 4 INCH STEEL
TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
156 080.48743 0
RELOCATE FACILITIES. INSTALL 340 FEET OF 4 INCH POLY ALONG BECKLEY
AVENUE AND ABANDON 450 FEET OF 8 INCH AND 550 FEET OF 4 INCH CAST IRON
TO ACCOMMODATE CITY OF DALLAS PAVING AND DRAINAGE IMPROVEMENTS
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
157 080.48782 0
RELOCATE FACILITIES. INSTALL 1960 FEET OF 6 INCH, 585 FEET OF 4 INCH, AND
980 FEET OF 2 INCH POLY ALONG COLLEGE AND ABANDON 1245 FEET OF 8 INCH,
580 FEET OF 6 INCH, AND 1050 FEET OF 4 INCH CAST IRON TO ACCOMMODATE
CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
158 080.48800 83
RELOCATE FACILITIES. INSTALL 4,160 FEET OF 8 INCH, 165 FEET OF 4 INCH, AND
1320 FEET OF 3 INCH POLY ALONG ABRAM STREET AND ABANDON 1,400 FEET OF 8
INCH, 1,760 FEET OF 4 INCH, 620 FEET OF 2 INCH STEEL, AND 1,830 FEET OF 2 INCH
AND 50 FEET OF 4 INCH POLY TOACCOMMODATE CITY OF ARLINGTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
159 080.48844 1
INSTALL 2375 FEET OF 2 INCH POLY ALONG COCHRAN AND ABANDON 2375 FEET
OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
160 080.48847 5
INSTALL 2865 FEET OF 2 AND 4 INCH POLY ALONG EUCLID AND ABANDON 3375
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY SEPTEMBER
161 080.48957 38,092
INSTALL 7982 FEET OF 8 INCH POLY ALONG BAGDAD ROAD DUE TO CUSTOMER
GROWTH. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LEANDER GROWTH JANUARY
162 080.49082 1
RELOCATE FACILITIES. INSTALL 30 FEET OF 6 INCH POLY, 30 FEET OF 6 INCH
STEEL, 275 FEET OF 4 INCH POLY, AND 250 FEET OF 2 INCH POLY ALONG SPRING
VALLEY AND ABANDON 25 FEET OF 6 INCH, 1175 FEET OF 6 INCH AND 1130 FEET
OF 4 INCH POLY TO ACCOMMODATE CITY OF RICHARDSON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
RELOCATION OF
FACILITIES SEPTEMBER
163 080.49145 1,041,210
INSTALL 531 FEET OF 12 INCH STEEL AND 14467 FEET OF 24 INCH STEEL AND
ABANDON 215 FEET OF 6 INCH STEEL AND 14800 FEET OF 24 INCH STEEL ALONG
STREETS OF MOCKINGBIRD STATION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
164 080.49148 4,653
INSTALL 11,500 FEET OF 24 INCH STEEL ALONG DT3 AT MOCKINGBIRD AND
ABANDON 8,895 FEET OF 24 INCH AND 3,900 FEET OF 20 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
165 080.49174 1
RELOCATE FACILITIES. INSTALL 755 FEET OF 4 INCH POLY ALONG ROSEDALE
STREET AND ABANDON 638 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
166 080.49273 3
INSTALL 1025 FEET OF 6 INCH POLY AND ABANDON 205 FEET OF 4 INCH POLY AND
400 FEET OF 6 INCH CAST IRON ALONG HARVARD AVENUE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY SEPTEMBER
167 080.49313 1,856
INSTALL 1815 FEET OF 6 INCH, 2113 FEET OF 4 INCH, AND 7753 FEET OF 2 INCH
POLY ALONG THE STREETS OF WOLF RANCH PH 1. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL GEORGETOWN GROWTH NOVEMBER
168 080.49441 1
RELOCATE FACILITIES. INSTALL 3394 FEET OF 4 INCH POLY ALONG HARDEMAN
STREET AND ABANDON 2100 FEET OF 4 INCH CAST IRON AND 1100 FEET OF 3 INCH
STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
169 080.49469 1
INSTALL 1735 FEET OF 2 INCH POLY ALONG ARMSTRONG AVENUE AND ABANDON
1735 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY SEPTEMBER
170 080.49480 0
RELOCATE FACILITIES. INSTALL 1100 FEET OF 2 INCH POLY ALONG CLINTON
AVENUE AND ABANDON 1040 FEET OF 6 INCH CAST IRON TO ACCOMMODATE CITY
OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
171 080.49578 0
RELOCATE FACILITIES. INSTALL 1260 FEET OF 4 INCH POLY ALONG NOLAN STREET
AND ABANDON 1260 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
172 080.49593 5
INSTALL 178 STEEL SERVICES AND ABANDON 178 STEEL SERVICES WITHIN
MAPSHEET #04-03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER
173 080.49658 (9,000)
INSTALL 1540 FEET OF 4 INCH AND 2344 FEET OF 2 INCH POLY ALONG STREETS OF
SIENA PHASES 4 & 5. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH JANUARY
174 080.49679 2
RELOCATE FACILITIES. INSTALL (51) 0.75 POLY SERVICES ALONG EDGEWOOD
TERRACE AND ABANDON (51) 0.75 STEEL SERVICES TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
MTX Additions
Page 5 of 178
224
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
175 080.49765 0
RELOCATE FACILITIES. INSTALL 1890 FEET OF 4 INCH POLY ALONG 36TH STREET
AND ABANDON 1890 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
176 080.49860 0
INSTALL 960 FEET OF 2 INCH POLY ALONG BURSON AND ABANDON 600 FEET OF 4
INCH CAST IRON TO ACCOMMODATE CITY OF LAKE WORTH IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
177 080.49910 0
RELOCATE FACILITIES. INSTALL 2486 FEET OF 2 INCH AND 63 FEET OF 4 INCH
POLY ALONG COLONIAL STREET AND ABANDON 1240 FEET OF 4 INCH STEEL, AND
1128 FEET OF CAST IRON TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
178 080.49979 0
RELOCATE FACILITIES. INSTALL 1765 FEET OF 4 INCH POLY ALONG GRANDBURY
STREET AND ABANDON 1150 FEET OF 4 INCH, 60 FEET OF 3 INCH, 340 FEET OF 2
INCH STEEL, 50 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CLEBURNE
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
RELOCATION OF
FACILITIES SEPTEMBER
179 080.49984 1
RELOCATE FACILITIES. INSTALL 175 FEET OF 2 INCH, 1850 FEET OF 4 INCH, 210
FEET OF 6 INCH POLY ALONG MEADOW LANE AND ABANDON 65 FEET OF 2 INCH,
265 FEET OF 3 INCH, 1635 FEET OF 4 INCH, 85 FEET OF 6 INCH STEEL, 95 FEET OF 2
INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
180 080.49985 1
INSTALL 1300 FEET OF 2 INCH POLY AND ABANDON 1300 FEET OF 2 INCH STEEL
ALONG GREENFIELD ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
181 080.50060 0
RELOCATE FACILITIES. INSTALL 450 FEET OF 4 INCH POLY ALONG AUSTIN STREET
AND ABANDON 40 FEET OF 3 INCH CAST IRON AND 400 FT OF 4 INCH STEEL TO
ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES SEPTEMBER
182 080.50109 0
RELOCATE FACILITIES. INSTALL 830 FEET OF 6 INCH, 221 FEET OF 4 INCH, 96 FEET
OF 2 INCH POLY AND ABANDON 1070 FEET OF 6 INCH, 422 FEET OF 2 INCH, AND
188 FEET OF 4 INCH POLY,375 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
183 080.50115 0
RELOCATE FACILITIES. INSTALL 2200 FEET OF 4 INCH AND 550 FEET OF 2 INCH
POLY ALONG 9TH STREET AND ABANDON 560 FEET OF 2 INCH POLY AND 2775
FEET OF 4 INCH CAST IRON AND 130 FEET OF 4 INCH POLY TO ACCOMMODATE
CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
184 080.50116 2
INSTALL 930 FEET OF 4 INCH POLY ALONG THACKERY AND ABANDON 1075 FEET
OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER
185 080.50207 1
INSTALL 285 FEET OF 2 INCH POLY ALONG QUINET AND ABANDON 337 FEET OF 2
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEAGOVILLE SYSTEM INTEGRITY SEPTEMBER
186 080.50220 0
RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH, 60 FEET OF 4 INCH POLY AND
ABANDON 240 FEET OF 3 INCH POLY AND 150 FEET OF 3 INCH STEEL ALONG LA
CABEZA TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
187 080.50270 0
INSTALL 2060 FEET OF 4 INCH POLY ALONG WANETA AND ABANDON 2160 FEET OF
4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
188 080.50331 1
RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY ALONG SKYLINE DRIVE
AND ABANDON 700 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW
DRAINAGE IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
RELOCATION OF
FACILITIES SEPTEMBER
189 080.50416 0
RELOCATE FACILITIES. INSTALL 1600 FEET OF 2 INCH POLY ALONG THOMAS
PLACE AND ABANDON 1315 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
190 080.50420 1
INSTALL 1415 FEET OF 6 INCH, 255 FEET OF 4 INCH, AND 385 FEET OF 2 INCH POLY
ALONG CARROLL AND ABANDON 1415 FEET OF 6 INCH, 255 FEET OF 4 INCH CAST
IRON AND 385 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
191 080.50421 1
RELOCATE FACILITIES. INSTALL (77) 0.75 INCH SERVICES ALONG HILL STREET AND
ABANDON (77) 0.75 INCH SERVICES TO ACCOMMODATE CITY OF DALLAS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
192 080.50422 0
RELOCATE FACILITIES. INSTALL 1200 FEET OF 2 INCH POLY ALONG EWING AND
ABANDON 1410 FEET OF 6 INCH STEEL, 420 FEET OF 8 INCH, 40 FEET OF 4 INCH
CAST IRON, 155 FEET OF 6 INCH POLY, 105 FEET OF 6 INCH STEEL, 450 FEET OF 4
INCH STEEL, 775 FEET OF 6 INCH, 550 FEET OF 4 INCH AND 100 FEET OF 3 INCH
CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
193 080.50424 1
RELOCATE FACILITIES. INSTALL (7) 0.75 INCH POLY SERVICES ALONG AIRLINE
STREET AND ABANDON 1830 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY
OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
194 080.50425 0
INSTALL 800 FEET OF 2 INCH POLY ALONG BELCLAIRE AVENUE AND ABANDON
2600 FEET OF 6 INCH AND 725 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
195 080.50454 0
INSTALL 550 FEET OF 2 INCH POLY ALONG ARDEN PLACE AND ABANDON 425 FEET
OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
196 080.50497 0
INSTALL 400 FEET OF 2 INCH POLY HALL STREET AND ABANDON 400 FEET OF 2
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEAGOVILLE SYSTEM INTEGRITY SEPTEMBER
197 080.50504 1
RELOCATE FACILITIES. INSTALL (27) 0.75 INCH POLY SERVICES ALONG HARWEN
TERRACE AND ABANDON (27) POLY SERVICES TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
198 080.50529 2
RELOCATE FACILITIES. INSTALL 98 POLY SERVICES AND ABANDON 98 STEEL
SERVICES ALONG ROSEDALE STREET TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
199 080.50635 1
INSTALL (20) 0.75 POLY SERVICES ALONG MINKS DRIVE AND ABANDON (20) STEEL
SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY SEPTEMBER
200 080.50659 0
RELOCATE FACILITIES. INSTALL 960 FEET OF 2 INCH POLY ALONG BURSON AND
ABANDON 600 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF LAKE
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH
RELOCATION OF
FACILITIES SEPTEMBER
201 080.50662 0
INSTALL (36) 0.75 INCH POLY SERVICES ALONG EISENHOWER AND ABANDON (36)
STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
202 080.50668 0
INSTALL 910 FEET OF 4 INCH POLY ALONG DRIESS STREET AND ABANDON 916
FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
203 080.50681 0
RELOCATE FACILITIES. INSTALL 1633 FEET OF 4 INCH POLY ALONG 16TH STREET
AND ABANDON 1308 FEET OF 4 INCH, 162 FEET OF 6 INCH, AND 72 FEET OF 4 INCH
POLY TO ACCOMMODATE CITY OF FORTH WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
MTX Additions
Page 6 of 178
225
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
204 080.50717 0
RELOCATE FACILITIES. INSTALL 305 FEET OF 4 INCH, 15 FEET OF 2 INCH POLY
ALONG MAY STREET AND ABANDON 837 FEET OF 4 INCH STEEL AND 150 FEET OF 4
INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
205 080.50727 0
RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH AND 300 FEET OF 2 INCH
POLY ALONG NW 15TH STREET AND ABANDON 90 FEET OF 4 INCH CAST IRON, 170
FEET OF 4 INCH, 111 FEET OF 2 INCH STEEL AND 111 FEET OF 2 INCH POLY TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
206 080.50745 3
RELOCATE FACILITIES. INSTALL 240 FEET OF 2 INCH, 120 FEET OF 3 INCH, AND 60
FEET OF 4 INCH POLY ALONG FOREST HILL DRIVE AND ABANDON 220 FEET OF 2
INCH, 100 FEET OF 3 INCH, AND 50 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY
OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
RELOCATION OF
FACILITIES SEPTEMBER
207 080.50753 2
INSTALL 870 FEET OF 2 INCH POLY ALONG SMALL STREET AND ABANDON 870
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER
208 080.50796 0
RELOCATE FACILITIES. INSTALL 560 FEET OF 4 INCH, 109 FEET OF 2 INCH POLY
ALONG SPRINGDALE ROAD AND ABANDON 397 FEET OF 4 INCH, 95 FEET OF 2
INCH, 50 FEET OF 3 INCH STEEL, AND 161 FEET OF 2 INCH POLY TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
209 080.50819 0
INSTALL 3230 FEET OF 8 INCH, 10 FEET OF 6 INCH, 725 FEET OF 4 INCH, 50 FEET OF
2 INCH POLY AND ABANDON 310 FEET OF 4 INCH, 1155 FEET OF 8 INCH, 1235 FEET
OF 12 INCH, 1180 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
210 080.50830 1
RELOCATE FACILITIES. INSTALL (19) 0.75 INCH POLY SERVICES ALONG SURREY
DRIVE AND ABANDON (19) 0.75 INCH SERVES TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
211 080.50838 0
RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY ALONG VAN NATTA
LANE AND ABANDON 200 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
212 080.50847 0
INSTALL 854 FEET OF 2 INCH POLY ALONG FORT WORTH AVENUE AND ABANDON
854 FEET 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
213 080.50867 3
INSTALL 2200 FEET OF 4 INCH AND 500 FEET OF 2 INCH POLY ALONG PACIFIC AND
ABANDON 1800 FEET OF 4 INCH, 400 FEET OF 6 INCH AND 460 FEET OF 2 INCH IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY SEPTEMBER
214 080.50903 0
INSTALL 1750 FEET OF 2 INCH AND 560 FEET OF 4 INCH POLY ALONG SOUTHWOOD
AND ABANDON 1138 FEET OF 4 INCH AND 1172 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
215 080.50939 0
RELOCATE FACILITIES. INSTALL 4200 FEET OF 2 INCH POLY ALONG FITZHUGH
AVENUE AND ABANDON 3063 FEET OF 4 INCH CAST IRON AND 159 FEET OF 4 INCH
POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
216 080.50975 2
INSTALL 525 FEET OF 2 INCH, 1210 FEET OF 4 INCH POLY AND ABANDON 2940 FEET
OF 4 INCH CAST IRON, 380 FEET OF 4 INCH POLY ALONG JEFFERSON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
217 080.50986 0
RELOCATE FACILITIES. INSTALL 176 FEET OF 2 INCH POLY ALONG KENLEY
STREET AND ABANDON 176 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
218 080.51003 0
INSTALL 1200 FEET OF 4 INCH POLY ALONG MELBA STREET AND ABANDON 1100
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
219 080.51004 0
RELOCATE FACILITIES. INSTALL (8) 0.75 INCH POLY SERVICES ALONG WINIFRED
DRIVE AND ABANDON (8) POLY SERVICES TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
220 080.51005 0
RELOCATE FACILITIES. INSTALL 270 FEET OF 2 INCH POLY ALONG WONDER DRIVE
AND ABANDON 270 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
221 080.51025 9,124
INSTALL 2923 FEET OF 2 INCH AND 1042 FEET OF 6 INCH POLY ALONG THE
STREETS OF TIMBER CREEK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH MAY
222 080.51030 2
RELOCATE FACILITIES. INSTALL 937 FEET OF 6 INCH, 567 FEET OF 4 INCH POLY
AND ABANDON 920 FEET OF 6 INCH STEEL, 690 FEET OF 4 INCH CAST IRON ALONG
SYLVANIA TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
223 080.51033 0
RELOCATE FACILITIES. INSTALL 1141 FEET OF 4 INCH POLY, 33 0.75 INCH POLY
SERVICES ALONG LILLIAN STREET AND ABANDON 1098 FEET OF 4 INCH CAST
IRON, 750 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
224 080.51034 0
RELOCATE FACILITIES. INSTALL 1182 FEET OF 4 INCH POLY AND ABANDON 1393
FEET OF 4 INCH CAST IRON, 257 FEET OF 4 INCH POLY AND 347 FEET OF 6 INCH
POLY ALONG DELL STREET TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
225 080.51041 0
INSTALL 2340 FEET OF 2 INCH POLY ALONG TREMONT AND ABANDON 580 FEET OF
6 INCH CAST IRON, 1610 FEET OF 4 INCH CAST IRON, 360 FEET OF 4 INCH CAST
IRON, 380 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
226 080.51053 5
RELOCATE FACILITIES. INSTALL 1320 FEET OF 4 INCH AND 560 FEET OF 2 INCH
POLY ALONG DAVIS STREET AND ABANDON 1635 FEET OF 8 INCH, 320 FEET OF 6
INCH AND 250 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
227 080.51054 3
RELOCATE FACILITIES. INSTALL 1050 FEET OF 4 INCH, 640 FEET OF 2 INCH AND 60
FEET OF 8 INCH POLY AND ABANDON 1330 FEET OF 8 INCH, 50 FEET OF 6 INCH, 895
FEET OF 4 INCH CAST IRON, AND 50 FEET OF 8 INCH STEEL ALONG DAVIS STREET
TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
228 080.51093 0
INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
229 080.51094 1
INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
230 080.51119 (4)
INSTALL STEEL SERVICES IN BROWNWOOD AND ABANDON STEEL SERVICES IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER
231 080.51131 0
INSTALL METERS AND ABANDON METERS FOR USE IN NORTH EAST REGION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER
232 080.51132 0
REPLACE AGING METERS WITHIN SOUTHWEST REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER
233 080.51133 0
INSTALL METERS AND ABANDON METERS FOR USE IN THE SOUTHEAST DISTRICT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
234 080.51134 0
INSTALL METERS AND ABANDON METERS FOR USE IN SOUTHEAST REGION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 7 of 178
226
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
235 080.51135 0
INSTALL METERS AND ABANDON METERS FOR USE IN THE SOUTHEAST SOUTH
REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER
236 080.51136 0
INSTALL METERS AND ABANDON METERS FOR USE IN THE FORT WORTH DISTRICT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
237 080.51137 0
INSTALL METERS AND ABANDON METERS FOR USE IN SOUTHWEST REGION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY SEPTEMBER
238 080.51138 0
INSTALL METERS AND ABANDON METERS FOR USE IN SOUTHWEST REGION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
239 080.51142 507
RELOCATE FACILITIES. INSTALL 293 FEET OF 4 INCH, 807 FEET OF 6 INCH, 10 FEET
OF 8 INCH AND 10320 FEET OF 12 INCH POLY ALONG CROWLEY ROAD AND
ABANDON 2940 FEET OF 4 INCH, 2695 FEET OF 6 INCH AND 195 FEET OF 8 INCH
POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
240 080.51158 0
RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY
ALONG FATHOM DRIVE AND ABANDON 200 FEET OF 4 INCH , 100 FEET OF 2 INCH
POLY AND 1 SERVICE LINE TO ACCOMMODATE THE CITY OF FORT WORTH IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
241 080.51159 0
RELOCATE FACILITIES. INSTALL 840 FEET OF 2 INCH ALONG CINDY LANE AND
ABANDON 610 FEET OF 2 INCH POLY, 230 FEET OF 2 INCH STEEL TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
242 080.51162 0
RELOCATE FACILITIES. INSTALL 850 FEET OF 2 INCH POLY ALONG DEXTER AND
ABANDON 892 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
243 080.51171 0
RELOCATE FACILITIES. INSTALL 925 FEET OF 4 INCH, 150 FEET OF 2 INCH POLY
ALONG CINDY LANE AND ABANDON 925 FEET OF 4 INCH, 150 FEET OF 2 INCH
STEEL TO ACCOMMODATE CITY OF FORT WORTH FORTH WORTH ADDITIONS IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
244 080.51176 2
RELOCATE FACILITIES. INSTALL 800 FEET OF 8 INCH ALONG OVERTON AND
ABANDON 800 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
245 080.51220 30,993
RELOCATE FACILITIES. INSTALL 16 FEET OF 6 INCH, 11 FEET OF 8 INCH AND 12255
FEET OF 12 INCH STEEL ALONG LINE O1 AND ABANDON 2365 FEET OF 3 INCH, 6136
FEET OF 4 INCH, 3026 FEET OF 6 INCH AND 4980 FEET OF 8 INCH STEEL TO
ACCOMMODATE PRIME POINTE DEVELOPMENT ALL CUSTOMERS LANCASTER
RELOCATION OF
FACILITIES DECEMBER
246 080.51221 0
INSTALL 900 FEET OF 2 INCH POLY ALONG IDAHO AND ABANDON 1080 FEET OF 4
INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
247 080.51235 (0)
RELOCATE FACILITIES. INSTALL 10,636 FEET OF 6 INCH, 394 FEET OF 4 INCH POLY
AND ABANDON 10,636 FEET OF 6 INCH, 394 FEET OF 4 INCH POLY ALONG OVILLA
ROAD TO ACCOMMODATE CITY OF DESOTO STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OVILLA
RELOCATION OF
FACILITIES SEPTEMBER
248 080.51244 0
RELOCATE FACILITIES. INSTALL 200 FEET OF 8 INCH POLY ALONG GILLON AND
ABANDON 200 FEET OF 8 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
249 080.51250 1
RELOCATE FACILITIES. INSTALL 840 FEET OF 6 INCH AND 200 FEET OF 4 INCH
POLY ALONG LAFAYETTE AVENUE AND ABANDON 840 FEET OF 6 INCH STEEL TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
250 080.51255 1
INSTALL 625 FEET OF 2 INCH POLY ALONG SHELBY AND ABANDON 260 FEET OF 4
INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
251 080.51263 0
INSTALL 1400 FEET OF 4 INCH POLY AND ABANDON 1400 FEET OF 4 INCH CAST
IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
252 080.51313 0
RELOCATE FACILITIES. INSTALL 1385 FEET OF 2 INCH POLY ALONG SELMA STREET
AND ABANDON 1385 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
253 080.51317 1
RELOCATE FACILITIES. INSTALL 1642 FEET OF 2 INCH POLY ALONG ELINOR
STREET AND ABANDON 1642 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
254 080.51318 1
RELOCATE FACILITIES. INSTALL 398 FEET OF 2 INCH, 1834 FEET OF 4 INCH POLY
AND ABANDON 615 FEET OF 2 INCH, 1456 FEET OF 3 INCH STEEL ALONG HOLLIS
STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
255 080.51332 0
INSTALL 965 FEET OF 2 INCH POLY AND (16) 0.75 INCH SERVICES ALONG BURTON
AND ABANDON 739 FEET OF 4 INCH CAST IRON AND (16) 1.25 INCH SERVICES IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
256 080.51371 5
INSTALL 6000 FEET OF 2 INCH POLY ALONG WEST 13TH AND ABANDON 6000 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER
257 080.51376 0
INSTALL 1875 FEET OF 4 INCH POLY, 15 POLY SERVICE LINES AND ABANDON 2990
FEET OF 3 INCH STEEL, 15 SERVICE LINES ALONG AVENUE E IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
258 080.51391 0
RELOCATE FACILITIES. INSTALL 756 FEET OF 2 INCH POLY ALONG BRITTAIN
STREET AND ABANDON 760 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
259 080.51395 1
RELOCATE FACILITIES. INSTALL 1560 FEET OF 4 INCH POLY ALONG WILKES
STREET AND ABANDON 1500 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES SEPTEMBER
260 080.51396 1
RELOCATE FACILITIES. INSTALL 305 FEET OF 2 INCH AND 105 FEET OF 6 INCH
POLY ALONG ASHBURY DRIVE AND ABANDON 100 FEET OF 1-1/4 INCH, 80 FEET OF
2 INCH, AND 100 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF
ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
261 080.51405 1
RELOCATE FACILITIES. INSTALL 945 FEET OF 2 INCH POLY ALONG SOUTH
ROBERTS AND ABANDON 945 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
262 080.51420 0
INSTALL 1510 FEET OF 2 INCH ALONG SYLVESTER AND ABANDON 1510 FEET OF 4
INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
263 080.51421 1
INSTALL 1455 FEET OF 4 INCH POLY ALONG AFTON AND ABANDON 1075 FEET OF 4
INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
264 080.51434 (0)
INSTALL 3700 FEET OF 2 INCH POLY ALONG BUCKNELL AND ABANDON 3700 FEET
OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 8 of 178
227
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
265 080.51451 0
RELOCATE FACILITIES. INSTALL 150 FEET OF 8 INCH, 65 FEET OF 6 INCH POLY, 75
FEET STEEL, 130 FEET OF 4 POLY, 125 FEET OF 2 INCH POLY AND ABANDON 125
FEET OF 2 INCH POLY, 65 FEET OF 6 INCH STEEL, 65 FEET OF 6 INCH, 130 FEET OF
4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
266 080.51459 0
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY ALONG DELEE STREET
AND ABANDON 500 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF BRYAN
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES SEPTEMBER
267 080.51471 0
INSTALL 1000 FEET OF 2 INCH POLY ALONG RUTGER AND ABANDON 1000 FEET OF
3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
268 080.51473 2
INSTALL 900 FEET OF 2 INCH AND 335 FEET OF 4 INCH POLY ALONG SOUTH
VERSAILLES AND ABANDON 900 FEET OF CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY SEPTEMBER
269 080.51474 2
INSTALL 865 FEET OF 2 INCH AND 505 FEET OF 4 INCH POLY ALONG BELCLAIRE
AVENUE AND ABANDON 860 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY SEPTEMBER
270 080.51513 0
RELOCATE FACILITIES. INSTALL (89) 0.75 INCH POLY SERVICE LINES AND
ABANDON 810 FEET OF 6 INCH CAST IRON, 585 FEET OF 6 INCH POLY AND 89
STEEL SERVICES ALONG THOMAS PLACE TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
271 080.51529 0
INSTALL STEEL SERVICES IN GRAND PRAIRIE AND ABANDON STEEL SERVICES IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER
272 080.51530 0
INSTALL STEEL SERVICES IN GRAND PRAIRIE AND ABANDON STEEL SERVICES IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER
273 080.51543 (0)
INSTALL 1750 FEET OF 2 INCH POLY ALONG MUNDY DRIVE AND ABANDON 1750
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
274 080.51617 1
INSTALL 1100 FEET OF 2 INCH POLY ALONG SOUTH BARRY AND ABANDON 1550
FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
275 080.51620 0
INSTALL 2251 FEET OF 2 INCH POLY ALONG TALLMAN AND ABANDON 1901 FEET OF
4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
276 080.51648 (1,058)
INSTALL 1200 FEET OF 6 INCH POLY ALONG VAUGHN AND ABANDON 1110 FEET OF
6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
277 080.51653 2
INSTALL 1200 FEET OF 2 INCH POLY ALONG CARROL AND ABANDON 850 FEET OF 2
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER
278 080.51655 0
INSTALL 868 FEET OF 2 INCH POLY ALONG DAGGETT AND ABANDON 740 FEET OF 6
INCH CAST IRON, 317 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
279 080.51676 (1)
RELOCATE FACILITIES. INSTALL 1470 FEET OF 4 INCH POLY AND ABANDON 720
FEET OF 4 INCH CAST IRON ALONG CARNATION AVENUE TO ACCOMMODATE CITY
OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
280 080.51702 3
RELOCATE FACILITIES. INSTALL 2600 FEET OF 4-INCH AND 180 FEET OF 2-INCH
POLY AND ABANDON 2200 FEET OF 4-INCH STEEL, 1,200 FEET OF 4-INCH POLY
ALONG STATE HIGHWAY 21 TO ACCOMMODATE CITY OF BRYAN IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES SEPTEMBER
281 080.51743 0
RELOCATE FACILITIES. INSTALL 365 FEET OF 6 INCH AND 210 FEET OF 2 INCH
POLY ALONG PERKINS AND ABANDON 320 FEET OF 6 INCH, 110 FEET OF 2 INCH
POLY AND 40 FEET OF 1.25 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES SEPTEMBER
282 080.51783 0
RELOCATE FACILITIES. INSTALL 3920 FEET OF 6 INCH, 130 FEET OF 4 INCH POLY
AND ABANDON 2384 FEET OF 6 INCH STEEL, 1145 FEET OF 8 INCH STEEL, 335 FEET
OF 6 INCH POLY, AND 20 FEET OF 8 INCH POLY ALONG SOUTH TOWN EAST
BOULEVARD TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
RELOCATION OF
FACILITIES SEPTEMBER
283 080.51801 1
RELOCATE FACILITIES. INSTALL 1712 FEET OF 2 INCH POLY AND ABANDON 997
FEET OF 4 INCH STEEL AND 860 FEET OF 4 INCH CAST IRON ALONG SYLVANIA TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
284 080.51804 0
INSTALL 475 FEET OF 2 INCH AND 546 FEET OF 4 INCH POLY ALONG CALHOUN AND
ABANDON 453 FEET OF 6 INCH CAST IRON, 185 FEET OF 4 INCH, 264 FEET OF 2
INCH POLY AND 130 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
285 080.51806 5
RELOCATE FACILITIES. INSTALL 3126 FEET OF 4 INCH POLY ALONG YUCCA
AVENUE AND ABANDON 2736 FEET OF 4 INCH CAST IRON AND 540 FEET OF 4 INCH
STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
286 080.51829 0
INSTALL 825 FEET OF 2 INCH AND 737 FEET OF 4 INCH POLY AND ABANDON 1320
FEET OF 4 INCH CAST IRON AND 159 FEET OF 4 INCH STEEL ALONG JENNINGS TO
ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
287 080.51840 1
INSTALL 1475 FEET OF 2 INCH AND 950 FEET OF 4 INCH POLY ALONG ALLEN
STREET AND ABANDON 2112 FEET OF 4 INCH CAST IRON AND 264 FEET OF 4 INCH
BARE STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
288 080.51843 21
RELOCATE FACILITIES. INSTALL 1715 FEET OF 4 INCH POLY AND ABANDON 678
FEET OF 4 INCH POLY AND 984 FEET OF 4 INCH CAST IRON ALONG DOROTHY LANE
TO ACCOMODATE A CITY OF FORT WORTH DRAINAGE IMPROVEMENT PROJECT TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
289 080.51846 2
INSTALL 1300 FEET OF 4 INCH POLY AND ABANDON 480 FEET OF 6 INCH AND 1230
FEET OF 4 INCH CAST IRON ALONG MONTROSE ROAD IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
290 080.51886 1
INSTALL 325 FEET OF 6 INCH POLY ALONG BEDFORD ROAD AND ABANDON 320
FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS COLLEYVILLE SYSTEM INTEGRITY SEPTEMBER
291 080.51889 3
INSTALL 1300 FEET OF 8 INCH POLY AND ABANDON 1200 FEET OF 8 INCH POLY
ALONG EULESS SOUTH MAIN STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
292 080.51920 23,907
RELOCATE FACILITIES. INSTALL 720 FEET OF 2 INCH, 450 FEET OF 4 INCH, 485
FEET OF 6 INCH AND 950 FEET OF 8 INCH POLY ALONG IH35 AND ABANDON 425
FEET OF 4 INCH STEEL, 440 FEET OF 8 INCH, 690 FEET OF 6 INCH, 315 FEET OF 3
INCH, AND 470 FEET OF 2 INCH POLY TO ACCOMMODATE TXDOT PROJECT. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES APRIL
293 080.51994 0
INSTALL 1955 FEET OF 4 INCH POLY ALONG VAUGHN STREET AND ABANDON 2060
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
294 080.52029 1
RELOCATE FACILITIES. INSTALL 398 FEET OF 2 INCH, 342 FEET OF 4 INCH POLY
ALONG AVENUE U AND ABANDON 84 FEET OF 3 INCH, 73 FEET OF 2 INCH, 88 FEET
OF 1 1/14 POLY, 12 FEET OF 3 INCH, 316 FEET OF 4 INCH, 93 FEET OF 3 STEEL TO
ACCOMMODATE CITY OF TEMPLE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
RELOCATION OF
FACILITIES SEPTEMBER
MTX Additions
Page 9 of 178
228
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
295 080.52036 39
RELOCATE FACILITIES. INSTALL 1380 FEET OF 4 INCH POLY AND 400 FEET OF 6
INCH POLY ALONG GOLIAD STREET AND ABANDON 173 FEET OF 3 INCH POLY, 1010
FEET OF 4 INCH POLY AND 383 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL
RELOCATION OF
FACILITIES OCTOBER
296 080.52039 0
INSTALL 450 FEET OF 2 INCH POLY ALONG WOODVILLE ROAD AND ABANDON 460
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER
297 080.52052 3
INSTALL (34) 0.75 INCH AND (6) 2 INCH POLY SERVICES ALONG FORT WORTH AND
ABANDON (40) COPPER SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
298 080.52053 1
INSTALL (34) 0.75 INCH AND (6) 2 INCH POLY SERVICES AND ABANDON (40)
COPPER SERVICE LINES ALONG STREETS OF FORT WORTH IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
299 080.52055 3
INSTALL (34) 0.75 INCH AND (6) 2 INCH POLY SERVICES AND ABANDON (40)
COPPER SERVICE LINES ALONG STREETS OF FORT WORTH IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
300 080.52056 2
INSTALL (34) 0.75 INCH AND (6) 2.00 INCH POLY SERVICES AND ABANDON (40)
COPPER SERVICES IN FORT WORTH IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
301 080.52108 1,586,604
RELOCATE FACILITIES. INSTALL 485 FEET OF 2 INCH POLY AND 6490 FEET OF 6
INCH POLY; AND 800 FEET OF 10 INCH STEEL CASING ALONG BONNIE BRAE
STREET AND ABANDON 490 FEET OF 2 INCH POLY, 935 FEET OF 4 INCH POLY AND
5,765 FEET OF 4 INCH STEEL TO ACCOMODATE CITY OF DENTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER
302 080.52232 0
INSTALL (60) STEEL SERVICES AND ABANDON (60) STEEL SERVICES IN GRAND
PRAIRIE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER
303 080.52245 0
INSTALL 990 FEET OF 4 INCH POLY AND 300 FEET OF 2 INCH POLY AND ABANDON
1290 FEET OF 4 INCH CAST IRON ALONG LELAND AVENUE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
304 080.52260 0
INSTALL 26 FEET OF 4 INCH, 292 FEET OF 6 INCH, AND 8549 FEET OF 8 INCH POLY
AND ABANDON 3310 FEET OF 4 INCH STEEL, 350 FEET OF 8 INCH STEEL AND 165
FEET OF 6 INCH POLY ALONG BELT LINE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ADDISON SYSTEM INTEGRITY SEPTEMBER
305 080.52287 1
INSTALL 3230 FEET OF 2 INCH, 990 FEET OF 4 INCH, 200 FEET OF 6 INCH POLY AND
ABANDON 1150 FEET OF 6 INCH, 1295 FEET OF 4 INCH, 1650 FEET OF 3 INCH
STEEL, 850 FEET OF 4 INCH AND 695 FEET OF 3 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY SEPTEMBER
306 080.52327 1
INSTALL 1185 FEET OF 2 INCH POLY AND ABANDON 465 FEET OF 4 INCH CAST IRON
ALONG CLEVELAND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
307 080.52338 0
RELOCATE FACILITIES. INSTALL 500 FEET OF 8 INCH POLY ALONG FARM TO
MARKET ROAD 550 AND ABANDON 290 FEET OF 3 INCH POLY TO ACCOMMODATE
CITY OF HEATH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS HEATH
RELOCATION OF
FACILITIES SEPTEMBER
308 080.52367 2
INSTALL 1660 FEET OF 4 INCH POLY AND ABANDON 1060 FEET OF 6 INCH STEEL
AND 1130 FEET OF 6 INCH CAST IRON ALONG CEDAR SPRINGS IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
309 080.52398 0
INSTALL 3494 FEET OF 2 INCH POLY AND ABANDON 343 FEET OF 2 INCH AND 2929
FEET OF 6 INCH CAST IRON ALONG ROWAN IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
310 080.52412 0
RELOCATE FACILITIES. INSTALL 1475 FEET OF 4 INCH POLY ALONG LEON STREET
AND ABANDON 300 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF GARLAND
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES SEPTEMBER
311 080.52442 0
RELOCATE FACILITIES. INSTALL 6700 FEET OF 8 INCH AND 116 FEET OF 4 INCH
STEEL AND ABANDON 6672 FEET OF 4 INCH STEEL ALONG HIGHWAY 377 TO
ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES SEPTEMBER
312 080.52463 38
INSTALL 1250 FEET OF 4 INCH AND 700 FEET OF 2 INCH POLY ALONG LLEWELLYN
AVENUE AND ABANDON 985 FEET OF 6 INCH, 680 FEET OF 4 INCH CAST IRON, AND
215 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
313 080.52476 1
INSTALL 479 FEET OF 2 INCH AND 1896 FEET OF 4 INCH POLY ALONG EAST
GREENWAY STREET AND ABANDON 1750 FEET OF 4 INCH, 550 FEET OF 6 INCH,
AND 150 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
314 080.52537 0
INSTALL 2680 FEET OF 2 INCH POLY AND ABANDON 2300 FEET OF 2 INCH STEEL
AND 380 FEET OF 2 INCH POLY ALONG WILSON ROAD IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
315 080.52538 0
RELOCATE FACILITIES. INSTALL 1350 FEET OF 2 INCH POLY AND ABANDON 1330
FEET OF 3 INCH STEEL ALONG LARGA TO ACCOMMODATE CITY OF DALLAS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
316 080.52539 0
RELOCATE FACILITIES. INSTALL 635 FEET OF 2 INCH POLY AND ABANDON 385
FEET OF 4 INCH STEEL AND 250 FEET OF 2 INCH STEEL ALONG WALNUT HILL TO
ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
317 080.52540 1
RELOCATE FACILITIES. INSTALL 400 FEET OF 8 INCH AND 150 FEET OF 4 INCH
POLY ALONG LEMMON AVENUE AND ABANDON 154 FEET OF 6 INCH AND 437 FEET
OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
318 080.52594 0
INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN DALLAS IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
319 080.52775 0
INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN DALLAS IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
320 080.52803 0
INSTALL 1200 FEET OF 2 INCH POLY AND ABANDON 1130 FEET OF 4 INCH CAST
IRON ALONG MELBA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
321 080.52821 0
RELOCATE FACILITIES. INSTALL 39 STEEL SERVICES ALONG FORRESTAL DRIVE
AND ABANDON 39 STEEL SERVICES TO ACCOMMODATE CITY OF ARLINGTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES SEPTEMBER
322 080.52904 1
INSTALL 1750 FEET OF 2 INCH POLY AND ABANDON 1750 FEET OF 4 INCH CAST
IRON ALONG LELAND AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
323 080.52906 (398)
INSTALL 19050 FEET OF 4 INCH STEEL AND 45 FEET OF 6 INCH POLY AND
ABANDON 18930 FEET OF 4 INCH STEEL AND 3 FEET OF 6 INCH POLY ON LINE E10-
5 IN GRAYSON COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS HOWE SYSTEM INTEGRITY OCTOBER
324 080.52909 2
INSTALL 1250 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY AND ABANDON 1570
FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
325 080.52910 0
INSTALL 1130 OF 8 INCH POLY AND ABANDON 1130 FEET OF 10 INCH STEEL IN
DALLAS ALONG SYCAMORE STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
326 080.52913 0
INSTALL 330 FEET OF 4 INCH POLY AND ABANDON 325 FEET OF 4 INCH STEEL
ALONG FIFTH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
327 080.52914 0
RELOCATE FACILITIES. INSTALL 720 FEET OF 2 INCH POLY AND THREE 0.75 INCH
POLY SERVICES ALONG BOMAR AVENUE AND ABANDON 720 FEET OF 4 INCH
STEEL AND 3 SERVICES TO ACCOMMODATE THE CITY OF FORT WORTH IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
MTX Additions
Page 10 of 178
229
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
328 080.52917 320
INSTALL 3850 FEET OF 4 INCH AND 355 FEET OF 2 INCH POLY ALONG WESTLAKE
AND ABANDON 835 FEET OF 6 INCH AND 3350 FEET OF 4 INCH CAST IRON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
329 080.53005 0
INSTALL 765 FEET OF 4 INCH POLY AND 905 FEET OF 2 INCH POLY ALONG
WESTSIDE DRIVE AND ABANDON 760 FEET OF 6 INCH CAST IRON AND 945 FEET OF
4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
330 080.53046 0
INSTALL 575 FEET OF 4 INCH POLY AND ABANDON 300 FEET OF 4 INCH CAST IRON
ALONG WASHINGTON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
331 080.53048 1
INSTALL 1150 FEET OF 4 INCH AND 690 FEET OF 2 INCH POLY ALONG COLLEGE
STREET AND ABANDON 3615 FEET OF 4 INCH CAST IRON AND 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER
332 080.53189 4
INSTALL 2550 FEET OF 2 INCH POLY AND ABANDON 2100 FEET OF 4 INCH CAST
IRON AND 275 FEET OF 4 INCH POLY ALONG SHELBY STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
333 080.53195 1
INSTALL 1830 FEET OF 2 INCH POLY ALONG PINE AND ABANDON 1830 FEET OF 4
INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
334 080.53204 0
INSTALL 1630 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 8 INCH POLY,
1605 FEET OF 8 INCH AND 235 FEET OF 4 INCH CAST IRON ALONG DAVIS IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
335 080.53221 278
RELOCATE FACILITIES. INSTALL 324 FEET OF 2 INCH AND 7346 FEET OF 4 INCH
POLY AND ABANDON 4530 FEET OF 2 INCH STEEL AND 25 FEET OF 2 INCH POLY
AND 325 FEET OF 4 INCH POLY ALONG ABRAM STREET TO ACCOMMODATE CITY
OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
336 080.53238 0
INSTALL 1170 FEET OF 4 INCH POLY ALONG NAKONA DRIVE AND ABANDON 1590
FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
337 080.53242 0
INSTALL 1540 FEET OF 2 INCH POLY ALONG BIDDISON STREET AND ABANDON 620
FEET OF 6 INCH, 430 FEET OF 4 INCH CAST IRON AND 180 FEET OF 2 INCH, AND 670
FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
338 080.53254 2
INSTALL 2248 FEET OF 2 INCH POLY AND ABANDON 2675 FEET OF 4 INCH CAST
IRON ALONG PARNELL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
339 080.53277 2
INSTALL 1200 FEET OF 2 INCH POLY, REPLACE 8 3/4 INCH SERVICES ALONG WEST
CLARENDON DRIVE AND ABANDON 1575 FEET OF 2 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
340 080.53302 0
INSTALL 1760 FEET OF 2 INCH POLY ALONG SOUTH BISHOP AVE AND ABANDON
525 FEET OF 4 INCH AND 1235 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
341 080.53322 0
RELOCATE FACILITIES. INSTALL 120 FEET OF 4 INCH, 250 FEET OF 2 INCH POLY
ALONG BAMBOO AND ABANDON 225 FEET OF 2 INCH, 100 FEET OF 3 INCH STEEL
TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
RELOCATION OF
FACILITIES SEPTEMBER
342 080.53384 183
RELOCATE FACILITIES. INSTALL 310 FEET OF 6 INCH AND 5927 FEET OF 8 INCH
POLY ALONG SOUTHWEST PARKWAY AND ABANDON 37 FEET OF 4 INCH, 208 FEET
OF 6 INCH, AND 5185 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF GRAND
PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES SEPTEMBER
343 080.53385 32
INSTALL AC MITIGATION FACILITIES ALONG LINE D17 IN ORDER TO PROVIDE
ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER
344 080.53392 0
INSTALL 1100 FEET OF 4 INCH POLY AND 26 0.75 INCH SERVICES. ABANDON 1100
FEET OF 3 INCH STEEL ALONG ALCORN ALLEY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
345 080.53451 1
INSTALL 1170 FEET OF 2 INCH POLY ALONG DELAWARE AND ABANDON 1170 FEET
OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
346 080.53479 0
RELOCATE FACILITIES. INSTALL 400 FEET OF 8 INCH AND 6900 FEET OF 6 INCH, 700
FEET OF 4 INCH AND 1200 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 8
INCH, 1150 FEET OF 4 INCH, AND 5900 FEET OF 3 INCH STEEL TO ACCOMMODATE
CITY OF RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS
RELOCATION OF
FACILITIES SEPTEMBER
347 080.53535 1
RELOCATE FACILITIES. INSTALL 4560 FEET OF 6 INCH, 320 FEET OF 4 INCH, AND
760 FEET OF 2 INCH POLY ALONG PIPELINE ROAD AND ABANDON 4560 FEET OF 6
INCH, 320 FEET OF 4 INCH, AND 760 FEET OF 2 INCH STEEL TO ACCOMMODATE
CITY OF HURST STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST
RELOCATION OF
FACILITIES SEPTEMBER
348 080.53555 1
INSTALL 1530 FEET OF 2 INCH POLY AND ABANDON 1920 FEET CAST IRON ALONG
BECKLEY AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
349 080.53561 0
INSTALL 1285 FEET OF 2 INCH POLY ALONG MADISON AND ABANDON 85 FEET OF 2
INCH STEEL, 1720 FEET OF 4 INCH, AND 1325 FEET OF 8 INCH CAST IRON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
350 080.53591 44
RELOCATE FACILITIES. INSTALL 6 FEET OF 2 INCH, 8 FEET OF 3 INCH, 231 FEET OF
4 INCH, AND 1091 FEET OF 6 INCH POLY ALONG NEW YORK AVENUE AND
ABANDON 890 FEET OF 6 INCH, 160 FEET OF 3 INCH, AND 150 FEET OF 2 INCH POLY
TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES SEPTEMBER
351 080.53612 0
INSTALL 1175 FEET OF 4 INCH POLY AND ABANDON 1335 FEET OF 6 INCH CAST
IRON ALONG NAKONA DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
352 080.53613 515
INSTALL 4434 FEET OF 2 INCH POLY ALONG THE STREETS OF AVERY POINTE
PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ANNA GROWTH SEPTEMBER
353 080.53614 1
INSTALL 370 FEET OF 4 INCH POLY ALONG EAST 26TH STREET AND ABANDON 360
FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER
354 080.53623 0
INSTALL 1210 FEET OF 2 INCH POLY AND ABANDON 1160 FEET OF 4 INCH CAST
IRON ALONG SOUTH FITZHUGH AVENUE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
355 080.53624 2
INSTALL 1300 FEET OF 2 INCH POLY ALONG FITZHUGH AVENUE AND ABANDON 485
FEET OF 4 INCH AND 915 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
356 080.53627 0
INSTALL 1320 FEET OF 4 INCH AND 300 FEET OF 2 INCH POLY AND ABANDON 300
FEET OF 4 INCH AND 1310 FEET OF 8 INCH CAST IRON ALONG HARDING STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
357 080.53654 0
RELOCATE FACILITIES. INSTALL 2706 FEET OF 2 INCH POLY AND ABANDON 2711
FEET OF 2 INCH STEEL AND 1566 FEET OF 3 INCH STEEL ALONG RIVERSIDE DRIVE
TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
358 080.53668 0
INSTALL 1235 FEET OF 2 INCH POLY ALONG NORTH ROSEMONT DRIVE AND
ABANDON 170 FEET OF 2 INCH, 1187 FEET OF 6 INCH CAST IRON, AND 22 FEET OF
6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 11 of 178
230
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
359 080.53671 3
INSTALL 3035 FEET OF 2 INCH POLY ALONG THACKERY AND ABANDON 2005 FEET
OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER
360 080.53675 0
INSTALL 140 POLY SERVICES IN THE CITY OF CLEBURNE AND ABANDON 140 STEEL
SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER
361 080.53677 0
RELOCATE FACILITIES. INSTALL 435 FEET OF 6 INCH POLY ALONG NORTHWEST
HIGHWAY AND ABANDON 425 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF
DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
362 080.53678 1
INSTALL 345 POLY SERVICES IN THE CITY OF GRAND PRAIRIE AND ABANDON 345
STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER
363 080.53684 0
RELOCATE FACILITIES. INSTALL 500 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY
AND ABANDON 20 FEET OF 2 INCH AND 500 FEET OF 4 INCH STEEL TO
ACCOMMODATE CITY OF PALESTINE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE
RELOCATION OF
FACILITIES SEPTEMBER
364 080.53696 1
INSTALL 1600 FEET OF 6 INCH POLY ALONG MOCKINGBIRD LANE AND ABANDON
1645 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY SEPTEMBER
365 080.53697 3
INSTALL 1200 FEET OF 2 INCH POLY ALONG MISTY WOOD STREET AND ABANDON
2202 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
366 080.53699 0
INSTALL 1300 FEET OF 2 INCH POLY AND ABANDON 1328 FEET OF 2 INCH POLY
ALONG STONEPORT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
367 080.53700 2
INSTALL 1330 FEET OF 2 INCH POLY ALONG ELAM ROAD AND ABANDON 980 FEET
OF 2 INCH AND 530 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
368 080.53711 0
INSTALL (50) POLY SERVICES AND ABANDON (50) STEEL SERVICE LINES IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
369 080.53712 0
INSTALL 1645 FEET OF 2 INCH POLY ALONG HOLMES STREET AND ABANDON 1645
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
370 080.53713 1
INSTALL 950 FEET OF 2 INCH POLY ALONG HICKMAN LANE AND ABANDON 941
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
371 080.53731 0
INSTALL 985 FEET OF 4 INCH, 840 FEET OF 2 INCH POLY AND ABANDON 800 FEET
OF 4 INCH CAST IRON ALONG GARLAND ROAD IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
372 080.53778 0
INSTALL APPROXIMATELY 1677 FEET OF 4 INCH POLY ALONG BROADWAY AND
ABANDON 1393 FEET OF 4 INCH AND 388 FEET OF 6 INCH CAST IRON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
373 080.53779 0
INSTALL 1531 FEET OF 4 INCH POLY ALONG BRYAN STREET AND ABANDON 1531
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
374 080.53785 0
INSTALL 1837 FEET OF 4 INCH POLY AND ABANDON 519 FEET OF 6 INCH, 1111 FEET
OF 4 INCH CAST IRON, 167 FEET OF 2 INCH, AND 40 FEET OF 4 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
375 080.53800 412
INSTALL 8526 FEET OF 8 INCH, 840 FEET OF 4 INCH AND 2248 FEET OF 2 INCH POLY
ALONG THE STREETS OF SADDLECREEK PHASE 1. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
376 080.53809 0
INSTALL 1360 FEET OF 4 INCH POLY ALONG MISSOURI AVENUE AND ABANDON 878
FEET OF 4 INCH AND 1980 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
377 080.53810 0
INSTALL 688 FEET OF 2 INCH AND 2029 FEET OF 4 INCH POLY AND ABANDON 92
FEET OF 2 INCH, 403 FEET OF 4 INCH, 41 FEET OF 6 INCH AND 1692 FEET OF 8 INCH
CAST IRON, 109 FEET OF 6 INCH, AND 35 FEET OF 8 INCH POLY ALONG TUCKER AT
HEMPHILL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
378 080.53811 0
INSTALL 1433 FEET OF 4 INCH POLY ALONG DAGGETT STREET AND ABANDON 1433
FEET OF 4 INCH CAST IRON AND 309 FEET OF 6 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
379 080.53813 0
INSTALL 61 FEET OF 2 INCH AND 2210 FEET OF 4 INCH POLY AND ABANDON 1104
FEET OF 4 INCH CAST IRON ALONG STREETS OF FORT WORTH IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
380 080.53824 (0)
INSTALL 2340 FEET OF 4 INCH POLY ANF 35 FEET OF 8 INCH STEEL ALONG
HIGHWAY 67 AND ABANDON 3900 FEET OF 20 INCH STEEL, 250 FEET OF 4 INCH
AND 300 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
381 080.53829 0
INSTALL 1330 FEET OF 2 INCH, 314 FEET OF 4 INCH AND 5 FEET OF 6 INCH POLY
ALONG RAMEY STREET AND ABANDON 624 FEET OF 4 INCH AND 442 FEET OF 6
INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
382 080.53831 3
INSTALL 1280 FEET OF 4 INCH POLY ALONG VIRGINIA STREET AND ABANDON 1210
FEET OF 4 INCH, 1170 FEET OF 6 INCH STEEL AND 94 FEET OF 4 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY SEPTEMBER
383 080.53874 0
INSTALL 6965 FEET OF 4 INCH POLY AND ABANDON 2827 FEET OF 6 INCH, 2400
FEET OF 4 INCH CAST IRON, 47 FEET OF 8 INCH, 616 FEET OF 4 INCH STEEL, 794
FEET OF 6 INCH, AND 281 FEET OF 4 INCH POLY ALONG MITCHELL BOULEVARD IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
384 080.53892 5,876
INSTALL 3550 FEET OF 2 INCH AND 850 FEET OF 4 INCH POLY ALONG THE STREETS
OF HOLLYHOCK PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH SEPTEMBER
385 080.53893 5,876
INSTALL 6375 FEET OF 2 INCH AND 3525 FEET OF 4 INCH POLY ALONG THE
STREETS OF HOLLYHOCK PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH SEPTEMBER
386 080.53894 2,474
INSTALL 5650 FEET OF 2 INCH POLY ALONG STREETS OF HOLLYHOCK PHASE 4.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH SEPTEMBER
387 080.53909 4
RELOCATE FACILITIES. INSTALL 3900 FEET OF 24 INCH STEEL AND ABANDON 3175
FEET OF 24 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS WHEATLAND
ROAD IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
388 080.53959 0
INSTALL 619 FEET OF 4 INCH POLY AND 126 FEET OF 2 INCH POLY AND ABANDON
570 FEET OF 3 INCH AND 116 FEET OF 2 INCH STEEL ALONG TERRELL STREETS IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CANTON SYSTEM INTEGRITY SEPTEMBER
389 080.54000 1
RELOCATE FACILITIES. INSTALL 807 FEET OF 2 INCH AND 1356 FEET OF 6 INCH
POLY ALONG BELKNAP AND ABANDON 50 FEET OF 2 INCH, 55 FEET OF 6 INCH
POLY AND 1356 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
390 080.54002 1
RELOCATE FACILITIES. INSTALL 957 FEET OF 4 INCH POLY ALONG MONTREAL
CIRCLE AND ABANDON 875 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
HALTOM STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY
RELOCATION OF
FACILITIES SEPTEMBER
391 080.54021 0
INSTALL 3625 FEET OF 4 INCH POLY ALONG BURCHILL ROAD AND ABANDON 1715
FEET OF 4 INCH CAST IRON, 1625 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
392 080.54037 1,418
INSTALL 4755 FEET OF 2 INCH POLY ALONG THE STREETS OF AUBURN HILLS
PHASE 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH SEPTEMBER
393 080.54043 5
RELOCATE FACILITIES. INSTALL 3706 FEET OF 4 INCH ALONG BOYD AVENUE AND
ABANDON 81 FEET OF 2 INCH, 482 FEET OF 3 INCH , 1681 FEET OF 4 INCH CAST
IRON , 2657 FEET OF 6 INCH CAST IRON , 220 FEET OF 4 INCH POLY, AND 50 FEET
OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
MTX Additions
Page 12 of 178
231
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
394 080.54046 75
RELOCATE FACILITIES. INSTALL 1780 FEET OF 4 INCH POLY ALONG FIELDER ROAD
AND ABANDON 1765 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF
ARLINGTON WATER AND SANITARY SEWER RENEWAL PROJECT IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES SEPTEMBER
395 080.54052 1
INSTALL 45 STEEL SERVICES ALONG CITY OF FORT WORTH AND ABANDON 45
STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
396 080.54086 0
RELOCATE FACILITIES. INSTALL 175 FEET OF 2 INCH AND 45 FEET OF 4 INCH POLY
ALONG ARBOR LANE AND ABANDON 150 FEET OF 2 INCH POLY, 40 FEET OF 4 INCH
POLY AND 5 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES SEPTEMBER
397 080.54090 2
RELOCATE FACILITIES. INSTALL 280 FEET OF 6 INCH POLY ALONG OLD BURLESON
ROAD AND ABANDON 270 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN TARRANT COUNTY IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
398 080.54097 2
INSTALL 2000 FEET OF 4 INCH POLY ALONG REUNION STREET AND ABANDON 1100
FEET OF 2 INCH AND 900 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FAIRFIELD SYSTEM INTEGRITY SEPTEMBER
399 080.54112 16
RELOCATE FACILITIES. INSTALL 2300 FEET OF 4 INCH AND 200 FEET OF 2 INCH
POLY AND ABANDON 1030 FEET OF 4 INCH, 265 FEET OF 2 INCH POLY, 180 FEET OF
4 INCH AND 550 FEET OF 2 INCH STEEL ALONG HICKORY STREET TO
ACCOMMODATE CITY OF DENTON STREET PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES SEPTEMBER
400 080.54141 119
INSTALL 2165 FEET OF 2 INCH AND 1850 FEET OF 6 INCH POLY ALONG POTOMAC
AVENUE AND ABANDON 2885 FEET OF 6 INCH AND 75 FEET OF 2 INCH CAST IRON,
575 FEET OF 4 INCH POLY, AND 190 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY OCTOBER
401 080.54155 0
INSTALL 1755 FEET OF 2 INCH POLY ALONG HOLMES AND ABANDON 1335 FEET OF
4 INCH CAST IRON, 690 FEET OF 4 INCH, AND 145 FEET OF 3 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
402 080.54160 6
RELOCATE FACILITIES. INSTALL 2080 FEET OF 12 INCH STEEL ALONG SUBLETT
ROAD AND ABANDON 51 FEET OF 2 INCH, 570 FEET OF 4 INCH POLY, AND 1720
FEET OF 12 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES SEPTEMBER
403 080.54166 4
RELOCATE FACILITIES. INSTALL 2200 FEET OF 4 INCH AND 1400 FEET OF 2 INCH
POLY ALONG SOUTH COLLEGE AVENUE AND ABANDON 1700 FEET OF 4 INCH, 110
FEET OF 3 INCH, 900 FEET OF 2 INCH STEEL, 320 FEET OF 2 INCH, AND 60 FEET OF
4 INCH POLY TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES OCTOBER
404 080.54195 0
RELOCATE FACILITIES. INSTALL 3387 FEET OF 4 INCH POLY ALONG COLONIAL
PARKWAY AND ABANDON 1826 FEET OF 4 INCH STEEL, 959 FEET OF 6 INCH AND
506 FEET OF 4 INCH CAST IRON AND 610 FEET OF 4 INCH POLY TO ACCOMMODATE
CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
405 080.54211 4
INSTALL 1950 FEET OF 2 INCH POLY AND ABANDON 1030 FEET OF 4 INCH, 385 FEET
OF 6 INCH, AND 485 FEET OF 8 INCH CAST IRON ALONG CROZIER IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
406 080.54213 0
INSTALL 1210 FEET OF 2 INCH POLY AND ABANDON 1210 FEET OF 4 INCH CAST
IRON ALONG GARDEN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
407 080.54217 2
INSTALL 975 FEET OF 2 INCH AND 175 FEET OF 4 INCH POLY AND ABANDON 940
FEET OF 4 INCH CAST IRON ALONG LAWRENCE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
408 080.54253 2
RELOCATE FACILITIES. INSTALL 3961 FEET OF 4 INCH POLY ALONG NORTHWEST
PARKWAY AND ABANDON 2930 FEET OF 4 INCH STEEL, 1005 FEET OF 4 INCH, 392
FEET OF 3 INCH, AND 86 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
409 080.54264 17
RELOCATE FACILITIES. INSTALL 1023 FEET OF 4 INCH, 210 FEET OF 2 INCH POLY
AND ABANDON 1023 FEET OF 4 INCH STEEL ALONG ANGLE AVENUE TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
410 080.54270 22
RELOCATE FACILITIES. INSTALL 2715 FEET OF 4 INCH POLY AND ABANDON 2666
FEET OF 4 INCH CAST IRON ALONG ROBINSON STREET TO ACCOMMODATE CITY
OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS
RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
411 080.54273 1
RELOCATE FACILITIES. INSTALL 3458 FEET OF 6 INCH AND 140 FEET OF 2 INCH
POLY ALONG OLD RANDOL MILL ROAD AND ABANDON 3236 FEET OF 6 INCH, 210
FEET OF 2 INCH STEEL AND 334 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
412 080.54277 4,317
INSTALL 7200 FEET OF 6 INCH STEEL AND ONE REGULATOR STATION AND
ABANDON TWO REGULATOR STATIONS IN LINCOLN PARK. ALL CUSTOMERS CROSS ROADS
SYSTEM
IMPROVEMENT APRIL
413 080.54287 1
RELOCATE FACILITIES. INSTALL 850 FEET OF 2 INCH POLY AND ABANDON 840
FEET OF 3 INCH STEEL ALONG CLARENDON TO ACCOMMODATE CITY OF
COCKRELL HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COCKRELL HILL
RELOCATION OF
FACILITIES SEPTEMBER
414 080.54291 5
RELOCATE FACILITIES. INSTALL 273 FEET OF 2 INCH , 244 FEET OF 4 INCH, 2040
FEET OF 6 INCH POLY AND ABANDON 224 FEET OF 2 INCH, 236 FEET OF 4 INCH,
1986 FEET OF 6 INCH POLY ALONG COLONY STREET TO ACCOMMODATE CITY OF
CARROLLTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THE COLONY
RELOCATION OF
FACILITIES SEPTEMBER
415 080.54318 0
INSTALL (257) POLY SERVICES IN THE CITY OF EDGECLIFF VILLAGE AND ABANDON
(257) STEEL SERVICES ALONG IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER
416 080.54320 0
INSTALL (291) POLY SERVICES IN THE CITY OF ARLINGTON AND ABANDON (291)
STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER
417 080.54341 0
INSTALL 2755 FEET OF 2 INCH POLY ALONG MONTCLAIR AND ABANDON 2233 FEET
OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
418 080.54356 0
RELOCATE FACILITIES. ABANDON 4646 FEET OF 6 INCH CAST IRON AND 776 FEET
OF 6 INCH POLY ALONG ELDRIDGE TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
419 080.54357 1
INSTALL 26 POLY SERVICES AND ABANDON 18 FEET OF 2 INCH STEEL AND 26
STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
420 080.54359 3
INSTALL (55) POLY SERVICES IN THE CITY OF DALLAS AND ABANDON (55) STEEL
SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
421 080.54360 0
ABANDON 31 FEET OF 2 INCH STEEL IN DALLAS IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
422 080.54366 1
INSTALL 825 FEET OF 4 INCH AND 125 FEET OF 2 INCH POLY AND ABANDON 815
FEET OF 4 INCH CAST IRON AND 125 FEET OF 2 INCH STEEL ALONG BRYAN
PARKWAY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
423 080.54370 2
INSTALL (45) POLY SERVICES AND ABANDON (45) COPPER SERVICES IN THE TOWN
OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 13 of 178
232
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
424 080.54427 (0)
RELOCATE FACILITIES. INSTALL 1932 FEET OF 4 INCH POLY ALONG STADIUM
DRIVE AND ABANDON 2054 FEET OF 4 INCH STEEL, 721 FEET OF 4 INCH CAST IRON
TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
425 080.54428 10
RELOCATE FACILITIES. INSTALL 2285 FEET OF 4 INCH POLY ALONG WABASH
AVENUE AND ABANDON 4124 FEET OF 4 INCH, 125 FEET OF 6 INCH STEEL, 125
FEET OF 6 INCH, AND 120 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
426 080.54431 0
INSTALL 560 FEET OF 4 INCH POLY ALONG FRONT STREET AND ABANDON 560
FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FROST SYSTEM INTEGRITY SEPTEMBER
427 080.54446 0
INSTALL 1975 FEET OF 4 INCH POLY ALONG VICKERY BOULEVARD AND ABANDON
775 FEET OF 4 INCH POLY AND 425 FEET OF 4 INCH CAST IRON AND 1370 FEET OF
8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
428 080.54447 0
INSTALL 4920 FEET OF 4 INCH POLY ALONG BELLAIRE AND ABANDON 2158 FEET
OF 4 INCH, 2289 FEET OF 6 INCH AND 157 FEET OF 8 INCH CAST IRON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
429 080.54468 5
INSTALL 1835 FEET OF 2 INCH POLY ALONG MENTOR AVENUE AND ABANDON 1800
FEET OF 4 INCH CAST IRON AND 40 FEET OF 4 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
430 080.54472 0
INSTALL 1743 FEET OF 2 INCH POLY AND ABANDON 1820 FEET OF 4 INCH CAST
IRON AND 120 FEET OF 2 INCH STEEL ALONG MENTOR IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
431 080.54486 928
INSTALL 3275 FEET OF 2 INCH POLY ALONG THE STREETS OF HOMESTEAD.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SUNNYVALE GROWTH SEPTEMBER
432 080.54551 2
INSTALL 2825 FEET OF 8 INCH, 75 FEET OF 2 INCH AND 25 FEET OF 4 INCH ALONG
WALNUT HILL LANE AND ABANDON 23 FEET OF 3 INCH, 22 FEET OF 6 INCH AND
2830 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
433 080.54570 0
INSTALL 250 FEET OF 6 INCH POLY, 1742 FEET OF 4 INCH POLY, 365 FEET OF 2
INCH POLY ALONG RUFUS ROAD AND ABANDON 1724 FEET OF 4 INCH CAST IRON ,
415 FEET OF 6 INCH CAST IRON, 119 FEET OF 4 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
434 080.54590 1
INSTALL 1100 FEET OF 2 INCH POLY ALONG GOLDSPIER AND ABANDON 1100 FEET
OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
435 080.54610 0
INSTALL 1282 FEET OF 2 INCH POLY AND ABANDON 940 FEET OF 6 INCH CAST
IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
436 080.54611 0
INSTALL 1520 FEET OF 2 INCH POLY ALONG WRIGHT AND ABANDON 680 FEET OF 6
INCH AND 340 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
437 080.54624 1
INSTALL 1125 FEET OF 2 INCH POLY ALONG HOLMES AND ABANDON 1125 FEET OF
4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
438 080.54625 2
INSTALL 650 FEET OF 2 INCH AND 765 FEET OF 8 INCH POLY AND ABANDON 1340
FEET OF 4 INCH CAST IRON ALONG PENNSYLVANIA IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
439 080.54661 118,264
INSTALL 16 FEET OF 4 INCH STEEL AND 56 FEET OF 6 INCH POLY AND 2 FEET OF 8
INCH STEEL AND 11978 FEET OF 12 INCH STEEL AND ABANDON 14 FEET OF 2 INCH
POLY AND 13769 FEET OF 3 INCH STEEL AND 2 FEET OF 6 INCH POLY ALONG
CHIESA ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ROWLETT SYSTEM INTEGRITY OCTOBER
440 080.54681 0
RELOCATE FACILITIES. INSTALL (40) POLY SERVICES ALONG BELVEDERE DRIVE
AND ABANDON (40) STEEL SERVICES TO ACCOMMODATE PHASE 1 OF THE CITY OF
ARLINGTON 2016 RESIDENTIAL STREET REBUILD PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES SEPTEMBER
441 080.54685 61
RELOCATE FACILITIES. INSTALL 1808 FEET OF 8 INCH AND 100 FEET OF 2 INCH
POLY ALONG NEW HOPE DRIVE AND ABANDON 1808 FEET OF 8 INCH POLY TO
ACCOMMODATE CITY OF CEDAR PARK STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR PARK
RELOCATION OF
FACILITIES SEPTEMBER
442 080.54704 3
INSTALL 840 FEET OF 2 INCH AND 325 FEET OF 4 INCH POLY ALONG LIVE OAK AND
ABANDON 875 FEET OF 6 INCH CAST IRON AND 200 FEET OF 6 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
443 080.54706 1
INSTALL 1050 FEET OF 2 INCH POLY ALONG MENTOR AND ABANDON 940 FEET OF
2 INCH AND 1063 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
444 080.54707 0
INSTALL 950 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG WENONAH
DRIVE AND ABANDON 930 FEET OF 4 INCH AND 800 FEET OF 6 INCH CAST IRON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
445 080.54710 1
INSTALL (225) POLY SERVICES AND ABANDON (225) COPPER SERVICES IN THE
CITY OF FORT WORTH IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
446 080.54711 3
INSTALL 1096 FEET OF 2 INCH POLY ALONG POINSETTIA AND ABANDON 1096 FEET
OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
447 080.54717 0
INSTALL 1330 FEET OF 2 INCH POLY ALONG LAWHORN STREET AND ABANDON
1135 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
448 080.54733 120
INSTALL 17150 FEET OF 6 INCH AND 8350 FEET OF 4 INCH STEEL AT THE VAN
ALSTYNE MEASURING STATION AND ABANDON 25476 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY SEPTEMBER
449 080.54794 1
INSTALL 1640 FEET OF 2 INCH POLY ALONG CLARENDON DRIVE AND ABANDON
2435 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
450 080.54797 2
INSTALL 1740 FEET OF 2 INCH POLY AND ABANDON 1690 FEET OF 4 INCH CAST
IRON 1460 FEET OF 8 INCH STEEL ALONG SOUTH FLEMING AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
451 080.54842 1
INSTALL 207 POLY SERVICES AND ABANDON 270 STEEL SERVICES IN CITY OF
SAGINAW IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY SEPTEMBER
452 080.54854 1
RELOCATE FACILITIES. INSTALL 3093 FEET OF 6 INCH AND 1276 FEET OF 2 INCH
POLY ALONG US 377 AND ABANDON 3000 FEET OF 2 INCH STEEL AND 160 FEET OF
2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES SEPTEMBER
453 080.54858 28
RELOCATE FACILITIES. INSTALL 2386 FEET OF 6 INCH, 350 FEET OF 4 INCH AND
1636 FEET OF 2 INCH POLY AND ABANDON 1520 FEET OF 2 INCH, 300 FEET OF 3
INCH STEEL AND 610 FEET OF 2 INCH POLY ALONG US 377 TO ACCOMMODATE
CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES SEPTEMBER
454 080.54859 1
RELOCATE FACILITIES. INSTALL 650 FEET OF 6 INCH AND 200 FEET OF 4 INCH
POLY AND ABANDON 650 FEET OF 6 INCH AND 200 FEET OF 4 INCH POLY ALONG
EAST BROAD STREET TO ACCOMMODATE CITY OF MANSFIELD STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD
RELOCATION OF
FACILITIES SEPTEMBER
455 080.54863 3
INSTALL 725 FEET OF 6 INCH POLY ALONG HARVARD AND ABANDON 220 FEET OF 4
INCH CAST IRON AND 60 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
456 080.54875 0
INSTALL 2914 FEET OF 4 INCH POLY ALONG PARK PLACE AND ABANDON 1285 FEET
OF 4 INCH AND , 42 FEET OF 1.25 FEET OF STEEL, 68 FEET OF 2 INCH, AND 33 FEET
OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 14 of 178
233
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
457 080.54894 79
RELOCATE FACILITIES. INSTALL 6 FEET OF 3 INCH, 107 FEET OF 4 INCH AND 3216
FEET OF 6 INCH POLY ALONG FM3549 AND ABANDON 8 FEET OF 3 INCH AND 3310
FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF ROCKWALL STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL
RELOCATION OF
FACILITIES SEPTEMBER
458 080.54895 0
INSTALL 1866 FEET OF 4 INCH POLY ALONG AVENUE J AND ABANDON 1325 FEET
OF 4 INCH CAST IRON AND 540 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
459 080.54926 0
RELOCATE FACILITIES. INSTALL 860 FEET OF 2 INCH POLY AND ABANDON 625
FEET OF 2 INCH AND 500 FEET OF 4 INCH STEEL AND 11 FEET OF 2 INCH AND 5
FEET OF 4 INCH POLY ALONG 1ST STREET TO ACCOMMODATE CITY OF
CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
RELOCATION OF
FACILITIES SEPTEMBER
460 080.54934 7
INSTALL 685 FEET OF 2 INCH AND 2865 FEET OF 4 INCH POLY ALONG VAUGHN AND
ABANDON 3550 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
461 080.54965 0
INSTALL 275 FEET OF 6 INCH POLY AND ABANDON 275 FEET OF 6 INCH CAST IRON
ALONG DURHAM IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
462 080.54988 0
INSTALL SERVICES ALONG STREETS OF CARROLTON AND ABANDON SERVICES
DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY SEPTEMBER
463 080.55018 0
RELOCATE FACILITIES. INSTALL 222 FEET OF 2 INCH POLY AND ABANDON 212
FEET OF 2 INCH STEEL ALONG HARDEE STREET TO ACCOMMODATE CITY OF
CHANDLER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHANDLER
RELOCATION OF
FACILITIES SEPTEMBER
464 080.55026 1
INSTALL 850 FEET OF 6 INCH AND 1230 FEET OF 4 INCH POLY ALONG GARRISON
STREET AND ABANDON 836 FEET OF 8 INCH AND 1022 FEET OF 4 INCH CAST IRON
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER
465 080.55033 1
RELOCATE FACILITIES. INSTALL 374 FEET OF 2 INCH POLY AND ABANDON 337
FEET OF 2 INCH POLY ALONG THROCKMORTON TO ACCOMMODATE CITY OF
ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL
RELOCATION OF
FACILITIES SEPTEMBER
466 080.55041 0
INSTALL 1217 FEET OF 2 INCH POLY AND ABANDON 1176 FEET OF 2 INCH POLY
AND 32 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY SEPTEMBER
467 080.55045 0
INSTALL 2200 FEET OF 2 INCH POLY ALONG GLENWOOD AVENUE AND ABANDON
2200 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
468 080.55054 3
INSTALL 1000 FEET OF 2 INCH POLY AND ABANDON 970 FEET OF 6 INCH CAST
IRON ALONG HUDSON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
469 080.55055 1
INSTALL 1230 FEET OF 2 INCH POLY ALONG HUDSON STREET AND ABANDON 1015
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
470 080.55059 0
INSTALL 1152 FEET OF 2 INCH POLY ALONG JACKSON STREET AND ABANDON 1152
FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY SEPTEMBER
471 080.55060 82
RELOCATE FACILITIES. INSTALL 5175 FEET OF 2 INCH POLY AND ABANDON 3324
FEET OF 4 INCH STEEL, 350 FEET OF 4 INCH POLY AND 70 FEET OF 4 INCH CAST
IRON ALONG BERKLEY PLACE TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
472 080.55064 1
RELOCATE FACILITIES. INSTALL 1810 FEET OF 4 INCH AND 1010 FEET OF 2 INCH
POLY AND ABANDON 680 FEET OF 2 INCH STEEL ALONG CHURCH STREET TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
473 080.55065 2,158
INSTALL 9360 FEET OF 12 INCH STEEL AND ABANDON 9360 FEET OF 12 INCH STEEL
ALONG LINE J2 EAST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
474 080.55070 0
INSTALL 902 FEET OF 2 INCH AND 650 FEET OF 6 INCH POLY ALONG NORTH
CREEWOOD CIRCLE AND ABANDON 115 FEET OF 1.25 AND 787 FEET OF 3 INCH
POLY AND 650 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY SEPTEMBER
475 080.55083 2
INSTALL 4150 FEET OF 6 INCH, 601 FEET OF 2 INCH AND 10 FEET OF 4 INCH POLY
ALONG AMBLER STREET AND ABANDON 4000 FEET OF 4 INCH STEEL AND 400 FEET
OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
476 080.55091 (0)
RELOCATE FACILITIES. INSTALL 320 FEET OF 4 INCH POLY ALONG FM1938 AND
ABANDON 400 FEET OF 4 INCH POLY AND 100 FEET OF 4 INCH STEEL TO
ACCOMMODATE CITY OF NORTH RICHLAND HILLS STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTH RICHLAND HILLS
RELOCATION OF
FACILITIES SEPTEMBER
477 080.55097 0
INSTALL 950 FEET OF 2 INCH POLY AND ABANDON 950 FEET OF 4 INCH CAST IRON
ALONG DELAWARE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
478 080.55147 1,456
RELOCATE FACILITIES. INSTALL 20 FEET OF 4 INCH, 10 FEET OF 6 INCH, AND 1575
FEET OF 8 INCH POLY AND ABANDON 1530 FEET OF 4 INCH POLY ALONG
INTERSTATE HIGHWAY 30 TO ACCOMMODATE TXDOT HIGHWAY IMPROVEMENT
PROJECT. ALL CUSTOMERS ROCKWALL
RELOCATION OF
FACILITIES APRIL
479 080.55170 61
RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY ALONG AUSTIN STREET
AND ABANDON 380 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF GARLAND
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES SEPTEMBER
480 080.55172 3
INSTALL 1550 FEET OF 2 INCH POLY ALONG 22ND STREET AND ABANDON 1100
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER
481 080.55178 (0)
INSTALL 1240 FEET OF 4 INCH, 891 FEET OF 6 INCH AND 335 FEET OF 2 INCH POLY
AND ABANDON 825 FEET OF 2 INCH STEEL, 43 FEET OF 3 INCH STEEL, 135 FEET OF
2 INCH POLY, 1833 FEET OF 4 INCH AND 1227 FEET OF 6 INCH CAST IRON ALONG
DUTTON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER
482 080.55180 1
INSTALL 4468 FEET OF 2 INCH AND 360 FEET OF 4 INCH POLY ALONG CLAY
AVENUE AND ABANDON 2416 FEET OF 4 INCH AND 6 INCH CAST IRON, 1934 FEET
OF 4 INCH STEEL, AND 650 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER
483 080.55192 2
INSTALL 1750 FEET OF 2 INCH POLY ALONG LAWRENCE AND ABANDON 1780 FEET
OF 4 INCH AND 500 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
484 080.55195 3
INSTALL 1025 FEET OF 2 INCH POLY AND 330 FEET OF 4 INCH POLY AND ABANDON
1025 FEET OF 6 INCH AND 330 FEET OF 8 INCH CAST IRON ALONG LELAND AVENUE
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
485 080.55196 0
INSTALL 2760 FEET OF 6 INCH POLY AND ABANDON 1382 FEET OF 4 INCH, 838
FEET OF 6 INCH STEEL, 304 FEET OF 4 INCH, 70 FEET OF 6 INCH CAST IRON, 95
FEET OF 6 INCH , 71 FEET OF 2 INCH POLY ALONG TRAVIS AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
486 080.55204 48
INSTALL 7900 FEET OF 4 INCH POLY ALONG BERKLEY PLACE AND ABANDON 1608
FEET OF 4 INCH CAST IRON AND 8320 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
487 080.55205 0
INSTALL 1040 FEET OF 2 INCH POLY ALONG CARL STREET AND ABANDON 1040
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 15 of 178
234
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
488 080.55210 7
INSTALL 5441 FEET OF 4 INCH POLY ALONG ODESSA AVENUE AND ABANDON 561
FEET OF 8 INCH AND 770 FEET OF 4 INCH CAST IRON AND 1721 FEET OF 4 INCH
AND 625 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
489 080.55221 1
RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH AND 175 FEET OF 4 INCH
POLY ALONG STAFFORD DRIVE AND ABANDON 50 FEET OF 1.25 INCH, 265 FEET OF
2 INCH AND 170 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES SEPTEMBER
490 080.55232 0
INSTALL 32 FEET OF 4 INCH POLY AND ABANDON 18 FEET OF 4 INCH CAST IRON
ALONG STREETS OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
491 080.55234 0
RELOCATE FACILITIES. INSTALL 195 FEET OF 4 INCH AND 31 FEET OF 6 INCH POLY
ALONG WHITLEY ROAD AND ABANDON 131 FEET OF 4 INCH AND 20 FEET OF 6 INCH
POLY TO ACCOMMODATE CITY OF WATAUGA STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WATAUGA
RELOCATION OF
FACILITIES SEPTEMBER
492 080.55241 0
INSTALL 1400 FEET OF 4 INCH POLY, 35 SERVICES AND ABANDON 1235 FEET OF 4
INCH CAST IRON, 35 SERVICES ALONG MCCART STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
493 080.55251 (0)
INSTALL 1976 FEET OF 2 INCH POLY AND ABANDON 1851 FEET OF 2 INCH STEEL
AND 8 FEET OF 2 INCH POLY ALONG 42ND STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER
494 080.55257 0
INSTALL 1063 FEET OF 6 INCH POLY ALONG VICKERY AND ABANDON 1063 FEET OF
6 INCH CAST IRON AND 250 FEET OF 4 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
495 080.55260 0
INSTALL 1300 FEET OF 2 INCH POLY ALONG LAKE FOREST DRIVE AND ABANDON
1300 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ADDISON SYSTEM INTEGRITY SEPTEMBER
496 080.55279 90
INSTALL 1420 FEET OF 2 INCH AND 775 OF 4 INCH POLY AND ABANDON 345 FEET
OF 6 INCH AND 1500 FEET OF 4 INCH CAST IRON ALONG GLENWICK LANE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER
497 080.55280 112
INSTALL 2710 FEET OF 2 INCH POLY AND ABANDON 565 FEET OF 1.25 INCH POLY,
2145 FEET OF 4 INCH, 720 FEET OF 6 INCH, AND 660 FEET OF 8 INCH CAST IRON
ALONG NORTH FITZHUGH AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
498 080.55304 86
RELOCATE FACILITIES. INSTALL 2725 FEET OF 4 INCH POLY ALONG SIX FLAGS
ROAD AND ABANDON 50 FEET OF 2 INCH, 86 FEET OF 4 INCH POLY AND 53 FEET OF
3 INCH, AND 2537 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES SEPTEMBER
499 080.55320 116
RELOCATE FACILITIES. INSTALL 3000 FEET OF 4 INCH POLY AND ABANDON 117
FEET OF 2 INCH, 1888 FEET OF 4 INCH STEEL AND 125 FEET OF 2 INCH, 25 FEET OF
4 INCH AND 20 FEET OF 6 INCH POLY ALONG FOREST STREET TO ACCOMMODATE
CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
500 080.55322 105
INSTALL 1830 FEET OF 2 INCH POLY ALONG THROCKMORTON AND ABANDON 3515
FEET OF 4 INCH, 330 FEET OF 6 INCH CAST IRON, 150 FEET OF 4 INCH, 190 FEET OF
3 INCH POLY, 475 FEET OF 6 INCH AND 45 FEET OF 8 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
501 080.55337 43
INSTALL 6400 FEET OF 10 INCH STEEL AND ABANDON 6400 FEET OF 8 INCH STEEL
ALONG KC WEST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
502 080.55351 106
RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH AND 3045 FEET OF 4 INCH
POLY AND ABANDON 2487 FEET OF 2 INCH STEEL, 437 FEET OF 2 INCH, AND 180
FEET OF 4 INCH POLY ALONG PECAN STREET TO ACCOMMODATE THE CITY OF
ROANOKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROANOKE
RELOCATION OF
FACILITIES OCTOBER
503 080.55379 99
INSTALL 1230 FEET OF 2 INCH POLY ALONG ELECTRA AND ABANDON 820 FEET OF
4 INCH AND 410 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
504 080.55380 (1,049)
INSTALL 1030 FEET OF 2 INCH POLY AND ABANDON 1030 FEET OF 4 INCH CAST
IRON ALONG BERTRAND AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
505 080.55397 (0)
RELOCATE FACILITIES. INSTALL 1215 FEET OF 4 INCH AND 1285 FEET OF 2 INCH
POLY ALONG KINGSBRIDGE AND ABANDON 680 FEET OF 4 INCH, 535 FEET OF 3
INCH AND 1385 FEET OF 2 INCH POLY TO ACCOMMODATE ALLEYS REHAB
PROJECTS BY THE CITY OF GARLAND IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES SEPTEMBER
506 080.55405 439
INSTALL 12557 FEET OF 6 INCH STEEL ALONG LINE M3 AND ABANDON 20695 FEET
OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY OCTOBER
507 080.55419 3
INSTALL 2890 FEET OF 4 INCH POLY ALONG ROGERS AVENUE AND ABANDON 406
FEET OF 8 INCH, 1375 FEET OF 4 INCH CAST IRON, 1315 FEET OF 4 INCH, AND 317
FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
508 080.55422 2
RELOCATE FACILITIES. INSTALL 1360 FEET OF 2 INCH POLY ALONG ROSEHILL
ROAD AND ABANDON 1360 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES SEPTEMBER
509 080.55423 2
RELOCATE FACILITIES. INSTALL 840 FEET OF 4 INCH POLY ALONG LYONS ROAD
AND ABANDON 810 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF GARLAND
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES SEPTEMBER
510 080.55424 3
RELOCATE FACILITIES. INSTALL 680 FEET OF 4 INCH POLY ALONG FALLBROOK
DRIVE AND ABANDON 675 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF
GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES SEPTEMBER
511 080.55425 0
RELOCATE FACILITIES. INSTALL 480 FEET OF 2 INCH POLY ALONG GUTHRIE ROAD
AND ABANDON 500 FEET OF 1.25 INCH POLY TO ACCOMMODATE CITY OF GARLAND
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES SEPTEMBER
512 080.55485 0
INSTALL 1100 FEET OF 2 INCH POLY ALONG PIERCE STREET AND ABANDON 960
FEET OF 6 INCH CAST IRON AND 140 FEET OF 6 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
513 080.55487 2
INSTALL 2055 FEET OF 2 INCH POLY ALONG EXLINE STREET AND ABANDON 210
FEET OF 4 INCH AND 1845 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
514 080.55488 6
INSTALL 1900 FEET OF 2 INCH POLY ALONG CARPENTER AVENUE AND ABANDON
1850 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
515 080.55495 53
RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH AND 465 FEET OF 6 INCH
POLY ALONG PATTON DRIVE AND ABANDON 18 FEET OF 2 INCH AND 460 FEET OF 6
INCH STEEL TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES SEPTEMBER
516 080.55513 3
INSTALL (372) POLY SERVICES ALONG STREETS OF ARLINGTON AND ABANDON
(372) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER
517 080.55520 0
INSTALL 300 FEET OF 4 INCH POLY ALONG BOMBER DRIVE AND ABANDON 285
FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER
518 080.55565 2
RELOCATE FACILITIES. INSTALL 2425 FEET OF 2 INCH POLY ALONG GARDENVIEW
AND ABANDON 2486 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DALLAS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
MTX Additions
Page 16 of 178
235
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
519 080.55568 3
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH, 1750 FEET OF 4 INCH, AND
100 FEET OF 8 INCH POLY ALONG HIGHLAND AND ABANDON 100 FEET OF 2 INCH,
2032 FEET OF 6 INCH, AND 294 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF
DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
520 080.55642 131
RELOCATE FACILITIES. INSTALL 5745 FEET OF 4 INCH POLY ALONG LOTUS AVENUE
AND ABANDON 1800 FEET OF 6 INCH CAST IRON, 540 FEET OF 6 INCH, 580 FEET OF
3 INCH, AND 465 FEET OF 2 INCH STEEL, AND 185 FEET OF 6 INCH POLY TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
521 080.55667 0
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION ALONG SW 1ST STREET IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS KERENS SYSTEM INTEGRITY SEPTEMBER
522 080.55674 0
INSTALL 1215 FEET OF 6 INCH POLY, 4196 FEET OF 4 INCH POLY ALONG CUSTER
ROAD AND ABANDON 1215 FEET OF 6 INCH STEEL, 2831 FEET OF 4 INCH POLY,
1365 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER
523 080.55682 (0)
INSTALL 6033 FEET OF 2 INCH POLY ALONG KELSEY DRIVE AND ABANDON 5683
FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER
524 080.55683 22
INSTALL 4200 FEET OF 2 INCH POLY AND ABANDON 4200 FEET OF 2 INCH POLY
ALONG WESTLAKE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER
525 080.55697 2
RELOCATE FACILITIES. INSTALL 450 FEET OF 6 INCH POLY ALONG PRESTON ROAD
AND ABANDON 350 FEET OF 6 INCH POLY AND 100 FEET OF 4 INCH POLY TO
ACCOMMODATE CITY OF FRISCO STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
RELOCATION OF
FACILITIES SEPTEMBER
526 080.55710 1
INSTALL 1310 FEET OF 2 INCH POLY AND ABANDON 1310 FEET OF 6 INCH CAST
IRON ALONG SOUTH FITZHUGH AVENUE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
527 080.55728 284
INSTALL 3000 FEET OF 24 INCH STEEL ALONG DT3 IN DALLAS COUNTY AND
ABANDON 3000 FEET OF 24 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER
528 080.55775 171
INSTALL 1395 FEET OF 2 INCH POLY ALONG VAN BUREN STREET AND ABANDON 25
FEET OF 4 INCH STEEL AND 1370 FEET OF 4 INCH CAST IRON IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
529 080.55797 1
INSTALL (163) POLY SERVICES ALONG STREETS OF FORT WORTH AND ABANDON
(163) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
530 080.55823 0
RELOCATE FACILITIES. INSTALL 610 FEET OF 4 INCH POLY AND ABANDON 530
FEET OF 4 INCH POLY ALONG SHERMAN DRIVE TO ACCOMMODATE CITY OF
DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES SEPTEMBER
531 080.55841 0
INSTALL (389) POLY SERVICES AND ABANDON (389) COPPER SERVICES IN THE
CITY OF ARLINGTON IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE
8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER
532 080.55867 1
INSTALL 1750 FEET OF 2 INCH POLY ALONG BRYAN PARKWAY AND ABANDON 1615
FEET OF 4 INCH CAST IRON AND 135 FEET OF 4 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
533 080.55920 143
INSTALL 1535 FEET OF 2 INCH POLY ALONG CEDAR SPRINGS ROAD AND ABANDON
1035 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
534 080.55923 2
RELOCATE FACILITIES. INSTALL 2186 FEET OF 2 INCH POLY AND (29) POLY
SERVICES ALONG SYLVANIA AVENUE AND ABANDON (29) STEEL SERVICES AND 30
FEET OF 2 INCH CAST IRON TO ACCOMMODATE THE CITY OF FORT WORTH CITY
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
535 080.55926 15
RELOCATE FACILITIES. INSTALL 3114 FEET OF 4 INCH POLY AND ABANDON 3100
FEET OF 4 INCH STEEL ALONG JACQELINE ROAD TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS
RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
536 080.55952 556,404
INSTALL 31,000 FEET OF 10 INCH STEEL ALONG HARMON ROAD AND US287 IN
FORT WORTH. ALL CUSTOMERS FORT WORTH
SYSTEM
IMPROVEMENT DECEMBER
537 080.55961 2
INSTALL 930 FEET OF 2 INCH POLY ALONG MYRTLE DRIVE AND ABANDON 930 FEET
OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
538 080.55963 4
INSTALL 1275 FEET OF 2 INCH POLY ALONG MYRTLE AND ABANDON 1275 FEET OF
4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
539 080.55966 1
RELOCATE FACILITIES. INSTALL 900 FEET OF 6 INCH POLY ALONG RALPH HALL
PARKWAY AND ABANDON 817 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL
RELOCATION OF
FACILITIES SEPTEMBER
540 080.55975 206
INSTALL 2140 FEET OF 4 INCH POLY AND ABANDON 2140 FEET OF 8 INCH CAST
IRON ALONG LAKESHORE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
541 080.55976 191
INSTALL 975 FEET OF 4 INCH POLY AND 585 FEET OF 2 INCH POLY AND ABANDON
1100 FEET OF 8 INCH CAST IRON AND 460 FEET OF 4 INCH CAST IRON ALONG
LAKESHORE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
542 080.55984 0
RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY ALONG ENNIS AVENUE
AND ABANDON 800 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF ENNIS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
RELOCATION OF
FACILITIES SEPTEMBER
543 080.55992 2
INSTALL 750 FEET OF 4 INCH POLY ALONG URSALINE AVENUE AND ABANDON 526
FEET OF 4 INCH AND 215 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER
544 080.56012 0
RELOCATE FACILITIES. INSTALL 600 FEET OF 6 INCH POLY ALONG 23RD STREET
AND ABANDON 127 FEET OF 3 INCH AND 464 FEET OF 6 INCH STEEL TO
ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES SEPTEMBER
545 080.56030 0
RELOCATE FACILITIES. INSTALL 1860 FEET OF 8 INCH AND 350 FEET OF 2 INCH
POLY ALONG LANCASTER AND ABANDON 50 FEET OF 6 INCH, 360 FEET OF 4 INCH,
900 FEET OF 3 INCH, AND 1835 FEET OF 8 INCH STEEL, 50 FEET OF 6 INCH, 640
FEET OF 4 INCH, AND 90 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
546 080.56033 0
RELOCATE FACILITIES. INSTALL 150 FEET OF 4 INCH AND 600 FEET OF 2 INCH
POLY ALONG ALEXANDER DRIVE AND ABANDON 30 FEET OF 2 INCH, 635 FEET OF 3
INCH, 15 FEET OF 4 INCH STEEL, 106 FEET OF 2 INCH, AND 70 FEET OF 4 INCH
POLY TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
RELOCATION OF
FACILITIES SEPTEMBER
547 080.56034 107
INSTALL 1390 FEET OF 2 INCH POLY ALONG WOODLAWN AND ABANDON 1240 FEET
OF 4 INCH AND 290 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
548 080.56044 0
RELOCATE FACILITIES. INSTALL 720 FEET OF 6 INCH POLY ALONG FM 1171 AND
ABANDON 120 FEET OF 6 INCH STEEL AND 580 FEET OF 6 INCH POLY TO
ACCOMMODATE CITY OF FLOWER MOUND STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
RELOCATION OF
FACILITIES SEPTEMBER
549 080.56065 3
INSTALL 975 FEET OF 2 INCH POLY ALONG PEMBROKE AND ABANDON 975 FEET OF
6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
550 080.56067 0
INSTALL 1480 FEET OF 2 INCH POLY AND ABANDON 1385 FEET OF 6 INCH AND 315
FEET OF 4 INCH CAST IRON ALONG OAK LAWN IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 17 of 178
236
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
551 080.56068 0
INSTALL 1460 FEET OF 2 INCH POLY ALONG PARK ROW AVENUE AND ABANDON
1045 FEET OF 4 INCH AND 310 FEET OF 6 INCH CAST IRON AND 135 FEET OF 4 INCH
POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
552 080.56097 0
RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH POLY ALONG LONGNECK
ROAD AND ABANDON 218 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
PRINCETON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PRINCETON
RELOCATION OF
FACILITIES SEPTEMBER
553 080.56105 379
RELOCATE FACILITIES. INSTALL 300 FEET OF 8 INCH POLY AND ABANDON 290
FEET OF 4 INCH POLY ALONG INTERSTATE HIGHWAY 30 TO ACCOMMODATE TXDOT
HIGHWAY IMPROVEMENT PROJECT. ALL CUSTOMERS ROCKWALL
RELOCATION OF
FACILITIES APRIL
554 080.56107 3
INSTALL 2600 FEET OF 4 INCH POLY ALONG HARWIN STREET AND ABANDON 1238
FEET OF 4 INCH, 1160 FEET OF 6 INCH, AND 360 FEET OF 8 INCH CAST IRON, AND
225 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
555 080.56110 14
INSTALL DEEP WELL GROUND BED AND RECTIFIER AT STATION ALONG LINE L21 IN
WILLIAMSON COUNTY IN ORDER TO PROVIDE ADEQUATE CATHODIC PROTECTION
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY SEPTEMBER
556 080.56144 (0)
INSTALL 2760 FEET OF 2 INCH POLY ALONG COLLEGE STREET AND ABANDON 1100
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS HOLLIDAY SYSTEM INTEGRITY SEPTEMBER
557 080.56147 (0)
INSTALL 1525 FEET OF 2 INCH POLY ALONG ELM AND ABANDON 915 FEET OF 2
INCH STEEL AND 610 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOLLIDAY SYSTEM INTEGRITY SEPTEMBER
558 080.56150 (0)
INSTALL 2418 FEET OF 2 INCH POLY AND ABANDON 2516 FEET OF 2 INCH STEEL
AND 237 FEET OF 2 INCH POLY ALONG THE STREETS OF CHADBOURNE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WINGATE SYSTEM INTEGRITY SEPTEMBER
559 080.56160 0
INSTALL 163 FEET OF 2 INCH AND 2087 FEET OF 6 INCH POLY ALONG 11TH STREET
AND ABANDON 163 FEET OF 2 INCH, 1490 FEET OF 6 INCH, 24 FEET OF 4 INCH, 467
FEET OF 8 INCH, 7 FEET OF 12 INCH STEEL, AND 98 FEET OF 6 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
560 080.56162 (0)
INSTALL (249) POLY SERVICES AND ABANDON (249) STEEL SERVICES ALONG
STREETS IN CITY OF TEMPLE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY SEPTEMBER
561 080.56164 (0)
INSTALL 1720 FEET OF 2 INCH AND 182 FEET OF 4 INCH POLY ALONG 10TH STREET
AND ABANDON 648 FEET OF 3 INCH AND 1407 FEET OF 2 INCH STEEL AND 45 FEET
OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
562 080.56173 (0)
INSTALL 3860 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 3686
FEET OF 3 INCH, 58 FEET OF 4 INCH, 106 FEET OF 2 INCH STEEL AND 400 FEET OF
2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY SEPTEMBER
563 080.56174 2
INSTALL 1140 FEET OF 2 INCH POLY AND ABANDON 1070 FEET OF 6 INCH CAST
IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
564 080.56180 0
INSTALL 1469 FEET OF 2 INCH AND 1221 FEET OF 4 INCH POLY ALONG DAVID
DAVIS DRIVE AND ABANDON 1469 FEET OF 2 INCH AND 1221 FEET OF 3 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY SEPTEMBER
565 080.56186 (0)
INSTALL 249 FEET OF 6 INCH AND 2141 FEET OF 2 INCH POLY ALONG 9TH STREET
AND ABANDON 538 FEET OF 2 INCH, 1149 FEET OF 3 INCH, 210 FEET OF 4 INCH
AND 249 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
566 080.56187 1
INSTALL 1000 FEET OF 2 INCH AND 670 FEET OF 4 INCH POLY ALONG US 175 AND
ABANDON 1000 FEET OF 6 INCH AND 670 FEET OF 8 INCH CAST IRON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
567 080.56188 1
INSTALL 480 FEET OF 2 INCH POLY AND ABANDON 318 FEET OF 4 INCH AND 1317
FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
568 080.56194 0
INSTALL 3211 FEET OF 4 INCH POLY ALONG FM153 AND ABANDON 3051 FEET OF 3
INCH STEEL AND 160 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WINGATE SYSTEM INTEGRITY SEPTEMBER
569 080.56195 0
INSTALL 300 FEET OF 4 INCH POLY AND ABANDON 300 FEET OF 3 INCH STEEL
ALONG BALLARD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SEAGOVILLE SYSTEM INTEGRITY SEPTEMBER
570 080.56199 1
INSTALL 1770 FEET OF 2 INCH POLY AND ABANDON 1779 FEET OF 6 INCH CAST
IRON ALONG YORK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
571 080.56200 43
INSTALL 1970 FEET OF 2 INCH POLY ALONG YORK AND ABANDON 1470 FEET OF 4
INCH AND 500 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
572 080.56209 (0)
INSTALL 1601 FEET OF 2 INCH POLY ALONG 18TH STREET AND ABANDON 1479
FEET OF 2 INCH STEEL AND 122 FEET OF 2 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
573 080.56222 0
INSTALL 1210 FEET OF 4 INCH AND 340 FEET OF 2 INCH POLY AND ABANDON 289
FEET OF 6 INCH AND 1100 FEET OF 8 INCH CAST IRON ALONG MALCOLM X
BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
574 080.56225 1
INSTALL (200) POLY SERVICES AND ABANDON (200) COPPER SERVICES ALONG
STREETS OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
575 080.56228 11
INSTALL 810 FEET OF 4 INCH AND 300 FEET OF 2 INCH POLY ALONG MCDERMOTT
AND ABANDON 1110 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
576 080.56229 (0)
INSTALL 1300 FEET OF 6 INCH POLY ALONG WINDTHORST ROAD AND ABANDON
1300 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
577 080.56232 199
INSTALL 1875 FEET OF 2 INCH AND 355 FEET OF 4 INCH POLY AND ABANDON 1392
FEET OF 3 INCH AND 93 FEET OF 4 INCH CAST IRON ALONG LOMO ALTO IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER
578 080.56234 2
INSTALL 625 FEET OF 4 INCH POLY ALONG EAST 30TH STREET AND ABANDON 610
FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER
579 080.56236 0
INSTALL 913 FEET OF 4 INCH POLY ALONG STRONG AVENUE AND ABANDON 913
FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY SEPTEMBER
580 080.56237 1
RELOCATE FACILITIES. INSTALL 620 FEET OF 2 INCH POLY ALONG SUNNYBROOK
AND ABANDON 620 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF GARLAND
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES SEPTEMBER
581 080.56244 0
INSTALL 1670 FEET OF 2 INCH POLY ALONG BRYAN STREET AND ABANDON 1260
FEET OF 8 INCH, 140 FEET OF CAST IRON, 210 FEET OF 4 INCH POLY AND 600 FEET
OF 8 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
582 080.56245 303
INSTALL 1200 FEET OF 8 INCH POLY AND ABANDON 1200 FEET OF 8 INCH STEEL
ALONG HIGHWAY 161 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER
583 080.56246 (0)
INSTALL 852 FEET OF 2 INCH POLY ALONG HUTCHINS STREET AND ABANDON 488
FEET OF 3 INCH, 107 FEET OF 2 INCH, 817 FEET OF 4 INCH POLY, 253 FEET OF 3
INCH, AND 170 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY SEPTEMBER
584 080.56249 0
INSTALL 332 FEET OF 2 INCH AND 410 FEET OF 4 INCH POLY ALONG 13TH STREET
AND ABANDON 273 FEET OF 6 INCH, 307 FEET OF 3 INCH, AND 183 FEET OF 4 INCH
STEEL, AND 25 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 18 of 178
237
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
585 080.56251 5
RELOCATE FACILITIES. INSTALL 453 FEET OF 6 INCH POLY ALONG JIM CRYSTAL
ROAD AND ABANDON 453 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES SEPTEMBER
586 080.56321 500
SOUTHWEST REGION SOUTH AREA OPERATIONS BLANKET FOR NEW SERVICE
LINES. ALL CUSTOMERS SYSTEM WIDE
SYSTEM EXPANSION
DUE TO CUSTOMER
GROWTH JULY
587 080.56363 395,738
INSTALL SERVICES AND ABANDON SERVICES IN NORTH EAST REGION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
588 080.56364 1,169,087
INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE NORTH WEST
REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
589 080.56365 4,059,623
INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE DALLAS REGION
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
590 080.56366 673,116
INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE SOUTHEAST
EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
591 080.56367 824,745
INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE SOUTHEAST
SOUTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
592 080.56368 1,404,951
INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE SOUTHWEST
FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
593 080.56369 427,524
INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE SOUTHWEST
SOUTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
594 080.56370 722,017
INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE SOUTHWEST
WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS STSTEM WIDE SYSTEM INTEGRITY OCTOBER
595 080.56371 477,362
INSTALL METERS AND ABANDON METERS IN THE NORTH EAST REGION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
596 080.56372 510,836
INSTALL METERS AND ABANDON METERS IN THE NORTH WEST REGION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
597 080.56373 770,208
INSTALL METERS AND ABANDON METERS IN THE DALLAS REGION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
598 080.56374 363,144
INSTALL METERS AND ABANDON METERS IN THE SOUTHEAST EAST REGION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
599 080.56375 249,875
INSTALL METERS AND ABANDON METERS IN THE SOUTHEAST SOUTH REGION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
600 080.56376 613,862
INSTALL METERS AND ABANDON METERS IN THE SOUTHWEST FORT WORTH
REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
601 080.56377 245,906
INSTALL METERS AND ABANDON METERS IN THE SOUTHWEST SOUTH REGION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
602 080.56378 200,681
INSTALL METERS AND ABANDON METERS IN THE SOUTHWEST WEST REGION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
603 080.56387 305,524
INSTALL MAIN ALONG STREETS OF NORTH EAST REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
604 080.56388 1,243,727
REPLACE MAINS IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWSTEM WIDE SYSTEM INTEGRITY OCTOBER
605 080.56389 2,600
REPLACE MAINS IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
606 080.56390 400,672
INSTALL 14 FEET OF 2 INCH POLY AND ABANDON 544 FEET OF 2 INCH STEEL IN
THE SOUTHEAST EAST REGION ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
607 080.56391 735,780
REPLACE MAINS IN THE SOUTHEAST SOUTH REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
608 080.56392 686,212
REPLACE MAINS IN THE SOUTHWEST FORT WORTH REGION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
609 080.56393 225,937
REPLACE MAINS IN SOUTHWEST SOUTH REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
610 080.56394 1,363,988
REPLACE MAINS IN THE SOUTHWEST WEST REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY OCTOBER
611 080.56403 0
INSTALL 700 FEET OF 2 INCH POLY AND ABANDON 700 FEET OF 2 INCH STEEL
ALONG WREN DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER
612 080.56410 2
RELOCATE FACILITIES. INSTALL 604 FEET OF 2 INCH POLY ALONG MOTLEY DRIVE
AND ABANDON 604 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
RELOCATION OF
FACILITIES SEPTEMBER
613 080.56416 1
INSTALL 2125 FEET OF 2 INCH POLY ALONG TYLER STREET AND ABANDON 1830
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
614 080.56421 2
INSTALL 1800 FEET OF 2 INCH POLY AND ABANDON 50 FEET OF 6 INCH STEEL AND
405 FEET 6 INCH AND 565 FEET OF 4 INCH CAST IRON ALONG COLORADO IN
ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
615 080.56422 1
INSTALL 1300 FEET OF 2 INCH POLY AND ABANDON 580 FEET OF 4 INCH CAST IRON
ALONG MAYFLOWER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
616 080.56430 42
INSTALL 1185 FEET OF 2 INCH POLY ALONG CLINTON AVENUE AND ABANDON 275
FEET OF 6 INCH POLY, 590 FEET OF 4 INCH CAST IRON AND 320 FEET OF 6 INCH
CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
617 080.56431 2
INSTALL 120 FEET OF 6 INCH STEEL ALONG GREAT SOUTH PARKWAY AND
ABANDON 120 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER
618 080.56433 8
RELOCATE FACILITIES. INSTALL 945 FEET OF 4 INCH AND 163 FEET OF 2 INCH
POLY ALONG BRENNAN AVENUE AND ABANDON 730 FEET OF 4 INCH, 25 FEET OF 2
INCH STEEL AND 206 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
619 080.56456 (0)
INSTALL 675 FEET OF 4 INCH POLY ALONG HAWES AND ABANDON 675 FEET OF 4
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
620 080.56483 (0)
INSTALL 650 FEET OF 4 INCH POLY ALONG HUTCHINS AND ABANDON 95 FEET OF 6
INCH, 416 FEET OF 3 INCH, AND 139 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY SEPTEMBER
621 080.56497 4
RELOCATE FACILITIES. INSTALL 680 FEET OF 8 INCH POLY ALONG CRESTVIEW
DRIVE AND ABANDON 680 FEET OF 8 INCH STEEL AND 400 FEET OF 4 INCH CAST
IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
622 080.56502 0
INSTALL 300 FEET OF 4 INCH POLY ALONG WALTON DRIVE AND ABANDON 500
FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY SEPTEMBER
623 080.56510 45
INSTALL 2785 FEET OF 2 INCH POLY ALONG DARMOUTH AVENUE AND ABANDON
1363 FEET OF 6 INCH AND 1800 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
624 080.56538 (0)
INSTALL 1311 FEET OF 2 INCH POLY ALONG 12TH STREET AND ABANDON 1311
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 19 of 178
238
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
625 080.56543 6
INSTALL 2850 FEET OF 4 INCH POLY ALONG ADA AVENUE AND ABANDON 1450
FEET OF 4 INCH AND 1850 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
626 080.56544 2
INSTALL 1600 FEET OF 4 INCH POLY ALONG WILDWOOD ROAD AND ABANDON 1600
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
627 080.56545 9
INSTALL 1895 FEET OF 4 INCH POLY AND ABANDON 1625 FEET OF 4 INCH CAST
IRON AND 270 FEET OF 2 INCH STEEL ALONG WATAUGA IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
628 080.56556 0
INSTALL 3725 FEET OF 2 INCH POLY ALONG COLLEGE HILLS AND ABANDON 2373
FEET OF 2 INCH, 1323 FEET OF 3 INCH STEEL, 13 FEET OF 2 INCH AND 16 FEET OF
3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY SEPTEMBER
629 080.56567 (0)
INSTALL ACTUATED VALVE, RELIEF VALVE, AND INSULATING FLANGE KITS AND
ABANDON MANUAL VALVE, AND ACTUATED VALVE FOR OWENS CORNING PLANT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY SEPTEMBER
630 080.56571 5,660
RELOCATE FACILITIES. INSTALL 1500 FEET OF 6 INCH STEEL AND ABANDON 740
FEET OF 3 INCH STEEL AND 498 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY
OF ALVARADO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALVARADO
RELOCATION OF
FACILITIES OCTOBER
631 080.56572 146
INSTALL 970 FEET OF 10 INCH STEEL ALONG AVENUE J AND ABANDON 940 FEET
OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
632 080.56583 (0)
RELOCATE FACILITIES. INSTALL 1756 FEET OF 6 INCH POLY ALONG MEADOW
BROOK DRIVE AND ABANDON 1756 FEET OF 6 INCH STEEL TO ACCOMMODATE
CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
633 080.56586 6
RELOCATE FACILITIES. INSTALL 2006 FEET OF 4 INCH POLY ALONG ROCKHILL
ROAD AND ABANDON 1990 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
634 080.56593 0
INSTALL 2025 FEET OF 2 INCH POLY AND ABANDON 1050 FEET OF 4 INCH AND 975
FEET OF 6 INCH CAST IRON ALONG COLORADO IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
635 080.56598 0
INSTALL 340 FEET OF 4 INCH POLY ALONG HOPKINS AND ABANDON 338 FEET OF 4
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER
636 080.56611 1
INSTALL 1460 FEET OF 2 INCH POLY AND ABANDON 460 FEET OF 6 INCH AND 1200
FEET OF 4 INCH CAST IRON ALONG BATES IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
637 080.56612 8
INSTALL 1835 FEET OF 2 INCH POLY AND ABANDON 1425 FEET OF 6 INCH CAST
IRON AND 350 FEET OF 6 INCH AND 60 FEET OF 2 INCH STEEL ALONG MILLERDALE
IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
638 080.56614 5
INSTALL 1135 FEET OF 2 INCH POLY ALONG FAIRDALE AND ABANDON 1135 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
639 080.56618 0
RELOCATE FACILITIES. INSTALL 1360 FEET OF 2 INCH, 9800 FEET OF 4 INCH,40
FEET OF 6 INCH POLY ALONG PULLIAM STREET AND ABANDON 19 FEET OF 1.25
INCH, 700 FEET OF 2 INCH, 106 FEET OF 6 INCH, 3208 FEET OF 4 INCH, 2257 FEET
OF 3 INCH STEEL TO ACCOMMODATE CITY OF SAN ANGELO STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
RELOCATION OF
FACILITIES SEPTEMBER
640 080.56625 103
INSTALL 1112 FEET OF 4 INCH AND 490 FEET OF 2 INCH POLY ALONG THE STREETS
OF SADDLECREEK 1E. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
641 080.56651 313
INSTALL TEST STATION ALONG LINE P7 IN ORDER TO PROVIDE CATHODIC
PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY SEPTEMBER
642 080.56652 7
INSTALL 4007 FEET OF 4 INCH POLY AND ABANDON 1206 FEET OF 2 INCH POLY
AND 965 FEET OF 3 INCH STEEL IN TAYLOR COUNTY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
643 080.56662 73
RELOCATE FACILITIES. INSTALL 1785 FEET OF 6 INCH POLY AND ABANDON 1785
FEET OF 6 INCH STEEL IN HAYNES AVENUE TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
644 080.56670 5,729
INSTALL DISTRICT REGULATOR STATION AT TURTLE CREEK IN DALLAS COUNTY
AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
645 080.56680 6
INSTALL 1745 FEET OF 2 INCH POLY AND ABANDON 1050 FEET OF 4 INCH, 150
FEET OF 6 INCH CAST IRON, AND 450 FEET OF 4 INCH POLY ALONG OWENSONS
DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
646 080.56681 7
INSTALL 1710 FEET OF 2 INCH POLY ALONG NOLTE DRIVE AND ABANDON 1710
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
647 080.56685 0
RELOCATE FACILITIES. INSTALL 2280 FEET OF 4 INCH POLY AND ABANDON 2250
FEET OF 4 INCH STEEL ALONG VEGA STREET TO ACCOMMODATE THE CITY OF
GRAND PRAIRIE DRAINAGE IMPROVEMENTS IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES SEPTEMBER
648 080.56686 0
INSTALL 3200 FEET OF 4 INCH POLY AND ABANDON 2050 FEET OF 4 INCH CAST
IRON, 1100 FEET OF 4 INCH STEEL ALONG CRENSHAW ROAD IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
649 080.56717 0
INSTAL (243) POLY SERVICES AND ABANDON (243) STEEL SERVICES ALONG
STREETS OF ARLINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
650 080.56720 (0)
INSTALL (253) POLY SERVICES AND ABANDON (253) STEEL SERVICES ALONG
STREETS IN CITY OF ROUND ROCK IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR SYSTEM INTEGRITY SEPTEMBER
651 080.56722 7
INSTALL 565 FEET OF 4 INCH AND 955 FEET OF 2 INCH POLY ALONG SAN
FERNANDO STREET AND ABANDON 565 FEET OF 8 INCH AND 770 FEET OF 4 INCH
CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
652 080.56723 (6)
INSTALL 1865 FEET OF 4 INCH POLY ALONG SAN FERNANDO WAY AND ABANDON
1865 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
653 080.56724 6
INSTALL 2065 FEET OF 4 INCH POLY AND ABANDON 1345 FEET OF 4 INCH CAST
IRON, 270 FEET OF 4 INCH, 10 FEET OF 6 INCH, AND 15 FEET OF 8 INCH POLY
ALONG SAN FERNANDO WAY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
654 080.56726 1
INSTALL (253) POLY SERVICES AND ABANDON (253) STEEL SERVICES ALONG
STREETS IN CITY OF DESOTO IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY SEPTEMBER
655 080.56731 1
RELOCATE FACILITIES. INSTALL 60 FEET OF 2 INCH POLY ALONG MONTCLAIR
PLACE AND ABANDON 4 FEET OF 2 INCH STEEL AND 66 FEET OF 2 INCH POLY TO
ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES SEPTEMBER
656 080.56735 248
INSTALL 1485 FEET OF 2 INCH POLY ALONG NEWMORE AVENUE AND ABANDON
1840 FEET OF 4 INCH AND 436 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
657 080.56739 1
INSTALL 1445 FEET OF 2 INCH POLY ALONG MALCOLM X AND ABANDON 1000 FEET
OF 4 INCH AND 445 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAIL ROAD
COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 20 of 178
239
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
658 080.56743 9
RELOCATE FACILITIES. INSTALL 2995 FEET OF 4 INCH POLY AND ABANDON 2074
FEET OF 4 INCH CAST IRON AND 694 FEET OF 4 INCH AND 200 FEET OF 2 INCH
STEEL ALONG COVELLO AVENUE TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
659 080.56747 (0)
INSTALL 1340 FEET OF 2 INCH POLY ALONG CANTERBURY AND ABANDON 1340
FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
660 080.56756 1
INSTALL 300 FEET OF 2 INCH POLY AND 80 FEET OF 4 INCH POLY ALONG NORTH
BEATON STREET AND ABANDON 300 FEET OF 2 INCH AND 80 FEET OF 4 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER
661 080.56800 27
INSTALL 1000 FEET OF 8 INCH POLY ALONG KIEST ROAD AND ABANDON 1000 FEET
OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
662 080.56809 0
INSTALL 1550 FEET OF 4 INCH POLY AND ABANDON 1490 FEET OF 6 INCH CAST
IRON ALONG TAOS ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
663 080.56810 53
INSTALL 1215 FEET OF 4 INCH AND 135 FEET OF 2 INCH POLY ALONG EASTERN
AVENUE AND ABANDON 1146 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
664 080.56817 (0)
INSTALL DISTRICT REGULATOR STATION 10, 78 FEET OF 4 INCH STEEL AND 80
FEET OF 6 INCH POLY IN ARLINGTON AND ABANDON DISTRICT REGULATOR
STATION, 15 FEET OF 2 INCH STEEL AND 75 FEET OF 4 INCH POLY IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY SEPTEMBER
665 080.56826 0
RELOCATE FACILITIES. ABANDON 1800 FEET OF 3 INCH POLY ON WEBB FERRELL
ROAD NORTH OF RED DEER WAY TO ACCOMMODATE CITY OF ARLINGTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES SEPTEMBER
666 080.56828 0
RELOCATE FACILITIES. INSTALL 1400 FEET OF 4 INCH POLY ALONG FARM TO
MARKET 709 AND ABANDON 1400 FEET OF 3 INCH POLY TO ACCOMMODATE CITY
OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
RELOCATION OF
FACILITIES SEPTEMBER
667 080.56855 8,317
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY BURKBURNETT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BURKBURNETT SYSTEM INTEGRITY OCTOBER
668 080.56856 4,166
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY HOLLIDAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS HOLLIDAY SYSTEM INTEGRITY OCTOBER
669 080.56857 (1,789)
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY ELECTRA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY OCTOBER
670 080.56858 334,702
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY WICHITA FALLS IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
671 080.56860 265,000
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY MCCGREGOR IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MCGREGOR SYSTEM INTEGRITY OCTOBER
672 080.56861 9
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY OSCEOLA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS OSCEOLA SYSTEM INTEGRITY OCTOBER
673 080.56862 191,266
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY MARLIN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY OCTOBER
674 080.56863 443,091
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY WACO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
675 080.56864 178,463
WEST AREA REPLACEMENTS IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WEST SYSTEM INTEGRITY OCTOBER
676 080.56865 62,946
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY HILLSBORO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
677 080.56866 8,956
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY BALLINGER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY OCTOBER
678 080.56867 336,282
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY SAN ANGELO IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
679 080.56869 0
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY WINTERS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WINTERS SYSTEM INTEGRITY SEPTEMBER
680 080.56870 79
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY COLEMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY OCTOBER
681 080.56871 6,443
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY COMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY OCTOBER
682 080.56872 6 BLANKET AREA REPLACEMENT AS PART OF THE TEXAS RULE 8.209. ALL CUSTOMERS BLANKET SYSTEM INTEGRITY OCTOBER
683 080.56873 18,603
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY BROWNWOOD IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER
684 080.56874 14,453
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY ALBANY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ALBANY SYSTEM INTEGRITY OCTOBER
685 080.56875 (17) BAIRD AREA REPLACEMENTS AS PART OF THE TEXAS RULE 8.209. ALL CUSTOMERS BAIRD SYSTEM INTEGRITY OCTOBER
686 080.56876 321,066
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY ABILENE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
687 080.56882 5
INSTALL 1620 FEET OF 2 INCH POLY ALONG WOODCREST AND ABANDON 1551
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
688 080.56884 159
INSTALL 1045 FEET OF 2 INCH AND 325 FEET OF 4 INCH POLY ALONG WOODCREST
STREET AND ABANDON 1045 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
689 080.56891 0
INSTALL 1080 FEET OF 4 INCH, 2100 FEET OF 2 INCH POLY ALONG LITTLE JOHN
STREET AND ABANDON 1080 FEET OF 6 INCH, 2150 FEET OF 4 INCH CAST IRON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
690 080.56897 (0)
INSTALL 550 FEET OF 4 INCH POLY ALONG COPELAND ROAD AND ABANDON 550
FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER
691 080.56904 1
INSTALL 700 FEET OF 2 INCH AND 515 FEET OF 4 INCH POLY ALONG SAN
CRISTOBAL AND ABANDON 642 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
692 080.56917 (0)
INSTALL 1900 FEET OF 2 INCH POLY ALONG MALCOLM X STREET AND ABANDON
1850 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
693 080.56918 245
INSTALL 1980 FEET OF 2 INCH POLY ALONG BRIGHAM AND ABANDON 260 FEET OF
4 INCH AND 1585 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
694 080.56919 70
INSTALL 1781 FEET OF 2 INCH POLY ALONG SUPERIOR AND ABANDON 1367 FEET
OF 4 INCH AND 310 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
695 080.56920 319
INSTALL 2170 FEET OF 2 INCH POLY AND ABANDON 2100 FEET OF 4 INCH AND 2220
FEET OF 6 INCH CAST IRON ALONG SOUTHLAND IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 21 of 178
240
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
696 080.56921 3
INSTALL 1070 FEET OF 2 INCH POLY AND ABANDON 690 FEET OF 4 INCH AND 380
FEET OF 6 INCH CAST IRON ALONG YORK IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
697 080.56922 0
INSTALL 1280 FEET OF 2 INCH POLY ALONG KENNISON ROAD AND ABANDON 1210
FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
698 080.56928 1
RELOCATE FACILITIES. INSTALL 560 FEET OF 4 INCH POLY ALONG BAYLOR
STREET AND ABANDON 52 FEET OF 2 INCH AND 351 FEET OF 4 INCH STEEL AND
148 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ENNIS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
RELOCATION OF
FACILITIES SEPTEMBER
699 080.56938 8
INSTALL 1870 FEET OF 2 INCH AND 675 FEET OF 4 INCH POLY AND ABANDON 1165
FEET OF 4 INCH AND 1040 FEET OF 6 INCH CAST IRON ALONG E GREENWAY
BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
700 080.56949 (0)
RELOCATE FACILITIES. INSTALL 600 FEET OF 8 INCH POLY ALONG PURINGTON
AVENUE AND ABANDON 600 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
701 080.56953 38,744
INSTALL 800 FEET OF 10 INCH STEEL ALONG LINE B AND ABANDON 300 FEET OF 10
INCH STEEL ALONG HASLET ROAD IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
702 080.56974 1
RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY ALONG GREENBRIER
ROAD AND ABANDON 764 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
RELOCATION OF
FACILITIES SEPTEMBER
703 080.56975 34
INSTALL 1665 FEET OF 2 INCH POLY ALONG WASHINGTON AND ABANDON 1570
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
704 080.56981 18
INSTALL METER ALONG CEMENTARY CALLOWAY ROAD AND ABANDON METER IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY SEPTEMBER
705 080.56988 0
RELOCATE FACILITIES. INSTALL 1325 FEET OF 2 INCH AND 75 FEET OF 4 INCH
POLY ALONG OAK STREET AND ABANDON 1442 FEET OF 2 INCH AND 118 FEET OF 4
INCH STEEL AND 275 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
STEPHENVILLE STREET IMPROVEMENT PROJECT IN ACCORDACE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
RELOCATION OF
FACILITIES SEPTEMBER
706 080.56989 4
INSTALL 1620 FEET OF 2 INCH POLY ALONG NEWPORT ROAD AND ABANDON 1335
FEET OF 4 INCH CAST IRON AND 235 FEET OF 4 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
707 080.56991 4
RELOCATE FACILITIES. INSTALL 1,500 FEET OF 2 INCH POLY ALONG ROE STREET
AND ABANDON 1,500 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF
WHITE SETTLEMENT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT
RELOCATION OF
FACILITIES SEPTEMBER
708 080.56995 2
RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG VIRGINIA
STREET AND ABANDON 885 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES SEPTEMBER
709 080.57011 0
RELOCATE FACILITIES. INSTALL 424 FEET OF 2 INCH POLY AND ABANDON 321
FEET OF 2 INCH POLY ALONG BURSEY ROAD TO ACCOMMODATE CITY OF
WATAUGA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WATAUGA
RELOCATION OF
FACILITIES SEPTEMBER
710 080.57013 4
INSTALL 1510 FEET OF 2 INCH POLY AND ABANDON 975 FEET OF 4 INCH AND 470
FEET OF 3 INCH CAST IRON ALONG SOUTH EDGEFIELD IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
711 080.57045 86
RELOCATE FACILITIES. INSTALL 46 FEET OF 16 INCH STEEL AND ABANDON 40 FEET
OF 16 INCH STEEL TO ACCOMMODATE DALLAS COUNTY RIVERFRONT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
712 080.57053 5
INSTALL 1410 FEET OF 2 INCH POLY AND ABANDON 785 FEET OF 4 INCH, 585 FEET
OF 6 INCH CAST IRON, 270 FEET OF 2 INCH, AND 220 FEET OF 6 INCH STEEL ALONG
ALLISON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
713 080.57058 4
RELOCATE FACILITIES. INSTALL 1689 FEET OF 4 INCH POLY ALONG 4TH STREET
AND ABANDON 1316 FEET OF 4 INCH CAST IRON AND 373 FEET OF 2 INCH STEEL
TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
714 080.57061 1
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY MEXIA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY OCTOBER
715 080.57063 106,055
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY WORTHAM IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WORTHAM SYSTEM INTEGRITY OCTOBER
716 080.57069 4
RELOCATE FACILITIES. INSTALL 1800 FEET OF 4 INCH AND 2065 FEET OF 2 INCH
POLY ALONG MOUNT VERNON AVENUE AND ABANDON 1050 FEET OF 6 INCH, 1330
FEET OF 2 INCH STEEL, 50 FEET OF 6 INCH, 630 FEET OF 4 INCH, 60 FEET OF 2
INCH POLY, 635 FEET OF 4 INCH, AND 750 OF 3 INCH CAST IRON, 1330 FEET OF 2
INCH STEEL AND 60 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
717 080.57070 16
RELOCATE FACILITIES. INSTALL 1480 FEET OF 4 INCH POLY ALONG MILLETT
ROAD,315 FEET OF 2 INCH POLY AND ABANDON 1480 FEET OF 4 INCH AND 315
FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
718 080.57071 6
INSTALL 615 FEET OF 2 INCH AND 1300 FEET OF 4 INCH POLY AND ABANDON 365
FEET OF 4 INCH AND 1305 FEET OF 6 INCH CAST IRON ALONG ROSS AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
719 080.57072 6
INSTALL 2615 FEET OF 2 INCH AND 900 FEET OF 4 INCH POLY AND ABANDON 1405
FEET OF 6 INCH AND 1460 FEET OF 4 INCH CAST IRON AND 45 FEET OF 1.25 INCH
AND 95 FEET OF 4 INCH STEEL ALONG GRASSMERE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER
720 080.57076 0
INSTALL 620 FEET OF 2 INCH AND 775 FEET OF 4 INCH POLY AND ABANDON 1395
FEET OF 4 INCH AND 390 FEET OF 6 INCH CAST IRON ALONG KENWELL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
721 080.57090 1
INSTALL 1260 FEET OF 2 INCH POLY AND ABANDON 40 FEET OF 3 INCH AND 1375
FEET OF 6 INCH CAST IRON ALONG THE STREETS OF SAN CRISTOBAL AND WHITE
ROCK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
722 080.57104 0
INSTALL 340 FEET OF 8 INCH AND 10 FEET OF 2 INCH POLY ALONG BOSQUE
BOULEVARD AND ABANDON 350 FEET OF 8 INCH, AND 10 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER
723 080.57123 0
RELOCATE FACILITIES. INSTALL 1610 FEET OF 6 INCH POLY AND ABANDON 1200
FEET OF 4 INCH STEEL AND 400 FEET OF 4 INCH POLY ALONG COLEMAN STREET
TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
RELOCATION OF
FACILITIES SEPTEMBER
724 080.57134 5
INSTALL 2500 FEET OF 2 INCH POLY ALONG 13TH STREET AND ABANDON 2500
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER
725 080.57147 2,364
INSTALL PANEL, COMMUNICATIONS AND ELECTRICAL EQUIPMENT ON MAINLINE
VALVE AND AN ACTUATOR ALONG FINLEY ROAD IN DALLAS COUNTY. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
MTX Additions
Page 22 of 178
241
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
726 080.57171 147
RELOCATE FACILITIES. INSTALL 2518 FEET OF 2 INCH, 569 FEET OF 4 INCH, 10
FEET OF 6 INCH AND 1255 FEET OF 8 INCH POLY ALONG MOUNT VERNON AVENUE
AND ABANDON 370 FEET OF 2 INCH, 951 FEET OF 3 INCH, 500 FEET OF 4 INCH, 1613
FEET OF 6 INCH, 1050 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
727 080.57193 0
RELOCATE FACILITIES. INSTALL 1260 FEET OF 2 INCH POLY AND ABANDON 1190
FEET OF 2 INCH STEEL AND 110 FEET OF 2 INCH POLY ALONG CEDAR STREET TO
ACCOMMODATE CITY OF CELBURNE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
RELOCATION OF
FACILITIES SEPTEMBER
728 080.57202 0
INSTALL 825 FEET OF 2 INCH AND 4 INCH POLY ALONG VICTORIA AND ABANDON
1600 FEET OF 6, 4, 3 AND 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY SEPTEMBER
729 080.57225 (0)
INSTALL (6) VALVES AND ABANDON DISTRICT REGULATOR STATION ALONG XT25
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY SEPTEMBER
730 080.57240 9
INSTALL 3000 FEET OF 2 INCH POLY AND ABANDON 1575 FEET OF 4 INCH CAST
IRON AND 1475 FEET STEEL ALONG LOWDEN STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
731 080.57247 0
RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY AND ABANDON 175
FEET OF 4 INCH POLY ALONG KINGSFORT PARKWAY TO ACCOMMODATE CITY OF
KAUFMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN
RELOCATION OF
FACILITIES SEPTEMBER
732 080.57248 (2)
RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY ALONG SHILOH ROAD
AND ABANDON 350 FEET OF 4 INCH POLY TO ACCOMMODATE PLANO ROAD
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES SEPTEMBER
733 080.57259 1
INSTALL 700 FEET OF 4 INCH POLY ALONG AIRPORT ROAD AND ABANDON 690
FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY SEPTEMBER
734 080.57261 1,065
RELOCATE FACILITIES. INSTALL 5000 FEET OF 4 INCH AND 7500 FEET OF 2 INCH
POLY ALONG FOURTH STREET AND ABANDON 4900 FEET OF 4 INCH, 6000 FEET OF
2 INCH AND 1500 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF
KAUFMAN ROAD AND DRAINAGE IMPROVEMENTS PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN
RELOCATION OF
FACILITIES OCTOBER
735 080.57262 1
RELOCATE FACILITIES. INSTALL 580 FEET OF 4 INCH POLY ALONG BOB JONES
ROAD AND ABANDON 575 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF
SOUTHLAKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE
RELOCATION OF
FACILITIES SEPTEMBER
736 080.57269 4
INSTALL 1253 FEET OF 2 INCH, 2695 FEET OF 4 INCH AND 15 FEET OF 6 INCH POLY
AND ABANDON 456 FEET OF 6 INCH STEEL, 800 FEET OF 4 INCH, 1753 FEET OF 6
INCH CAST IRON ALONG COLVIN STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
737 080.57278 2
INSTALL 1560 FEET OF 6 INCH, 780 FEET OF 4 INCH AND 880 FEET OF 2 INCH POLY
ALONG HINTON STREET AND ABANDON 1735 FEET OF 1.25 INCH AND 3 INCH STEEL
AND 331 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSON OF
TEXAS RULE 8209. ALL CUSTOMERS TIOGA SYSTEM INTEGRITY SEPTEMBER
738 080.57282 70
RELOCATE FACILITIES. INSTALL 13 FEET OF 2 INCH, 6 FEET OF 4 INCH, AND 2347
FEET OF 6 INCH POLY ALONG FISH CREEK ROAD AND ABANDON 61 FEET OF 2
INCH, 55 FEET OF 4 INCH, AND 5280 FEET OF 6 INCH POLY TO ACCOMMODATE CITY
OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES SEPTEMBER
739 080.57285 5
RELOCATE FACILITIES. INSTALL 635 FEET OF 2 INCH POLY AND ABANDON 618
FEET OF 2 INCH STEEL AND 49 FEET OF 2 INCH POLY ALONG ANDREW AVENUE TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
740 080.57293 3
INSTALL 27 FEET OF 2 INCH, 12 FEET OF 3 INCH, 6 FEET OF 4 INCH, 7 FEET OF 6
INCH AND 2680 FEET OF 8 INCH POLY AND ABANDON 10 FEET OF 2 INCH, 10 FEET
OF 3 INCH, 9 FEET OF 6 INCH, 2657 FEET OF 12 INCH AND 10 FEET OF 2 INCH STEEL
AND 2 FEET OF 3 INCH POLY AND 10 FEET OF 4 INCH STEEL AND 9 FEET OF 6 INCH
STEEL AND 2657 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
741 080.57294 769
INSTALL 3409 FEET OF 2 INCH POLY AND ABANDON 1485 FEET OF 2 INCH AND 417
FEET OF 4 INCH STEEL AND 802 FEET OF 2 INCH AND 126 FEET OF 4 INCH POLY
ALONG 20TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
742 080.57296 (0)
INSTALL DISTRICT REGULATOR STATION, 13 FEET OF 2 INCH STEEL AND 19 FEET
OF 4 INCH STEEL AND ABANDON DISTRICT REGULATOR STATION ALONG RED
RIVER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER
743 080.57312 126
INSTALL 752 FEET OF 2 INCH AND 2938 FEET OF 4 INCH POLY ALONG ROCKRIDGE
AND ABANDON 700 FEET OF 4 INCH CAST IRON AND 3125 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
744 080.57344 31,340
INSTALL 2700 FEET OF 6 INCH, 2200 FEET OF 4 INCH, AND 6400 FEET OF 2 INCH
POLY ALONG STREETS OF LIVELY PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH NOVEMBER
745 080.57348 0
RELOCATE FACILITIES. INSTALL 29 FEET OF 4 INCH POLY AND 1116 FEET OF 8
INCH POLY AND ABANDON 4 FEET OF 4 INCH, 132 FEET OF 8 INCH POLY AND 8
FEET OF 3 INCH AND 366 FEET OF 12 INCH STEEL ALONG LAMAR STREET TO
ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
746 080.57370 0
INSTALL 400 FEET OF 6 INCH POLY ALONG WATERCROSS DRIVE AND ABANDON
400 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
747 080.57371 3
RELOCATE FACILITIES. INSTALL 1070 FEET OF 2 INCH POLY ALONG EVANS
AVENUE AND ABANDON 330 FEET OF 6 INCH, 420 FEET OF 4 INCH CAST IRON, 50
FEET OF 6 INCH, AND 205 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
748 080.57374 0
INSTALL 1525 FEET OF 2 INCH POLY ALONG 5TH STREET AND ABANDON 872 FEET
OF 2 INCH, 298 FEET OF 4 INCH STEEL AND 398 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM SYSTEM INTEGRITY SEPTEMBER
749 080.57388 1
RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY AND ABANDON 383
FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES SEPTEMBER
750 080.57391 7
INSTALL 2260 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 6 INCH AND 1301
FEET OF 8 INCH CAST IRON ALONG LAKEWOOD BOULEVARD IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
751 080.57392 31
RELOCATE FACILITIES. INSTALL 1075 FEET OF 2 INCH POLY ALONG TRIGG STREET
AND ABANDON 1071 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF
WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
RELOCATION OF
FACILITIES SEPTEMBER
752 080.57393 40
RELOCATE FACILITIES. INSTALL 1078 FEET OF 2 INCH POLY ALONG STRALEY
AVENUE AND ABANDON1081 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF
WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
RELOCATION OF
FACILITIES SEPTEMBER
753 080.57396 44
RELOCATE FACILITIES. INSTALL 1235 FEET OF 2 INCH POLY ALONG LYLE STREET
AND ABANDON 1238 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
RELOCATION OF
FACILITIES SEPTEMBER
MTX Additions
Page 23 of 178
242
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
754 080.57397 57
RELOCATE FACILITIES. INSTALL 1100 FEET OF 2 INCH POLY ALONG COLEMAN
STREET AND ABANDON 1100 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
RELOCATION OF
FACILITIES SEPTEMBER
755 080.57399 40
RELOCATE FACILITIES. INSTALL 1279 FEET OF 2 INCH POLY ALONG ATON AVENUE
AND ABANDON 1213 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF
WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
RELOCATION OF
FACILITIES SEPTEMBER
756 080.57400 125
INSTALL 1460 FEET OF 4 INCH POLY AND ABANDON 1455 FEET OF 4 INCH CAST
IRON ALONG POMONA ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
757 080.57402 92
INSTALL 1865 FEET OF 4 INCH POLY AND ABANDON 1865 FEET OF 4 INCH CAST
IRON ALONG TAOS ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
758 080.57405 122
INSTALL 1934 FEET OF 2 INCH POLY AND ABANDON 780 FEET OF 4 INCH AND 735
FEET OF 6 INCH CAST IRON ALONG SOUTH CATERBURY STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
759 080.57406 48
INSTALL 885 FEET OF 2 INCH AND 540 FEET OF 4 INCH POLY ALONG KESSLER
CANYON AND ABANDON 1225 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
760 080.57419 1
RELOCATE FACILITIES. INSTALL 86 FEET OF 4 INCH POLY AND ABANDON 170
FEET OF 2 INCH, 132 FEET OF 3 INCH STEEL AND 80 FEET OF 2 INCH POLY AND
ALONG PECAN STREET TO ACCOMMODATE CITY OF HUTTO STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS HUTTO
RELOCATION OF
FACILITIES SEPTEMBER
761 080.57431 (0)
RELOCATE FACILITIES. INSTALL 800 FEET OF 4 INCH POLY ALONG OAKWOOD AND
ABANDON 790 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF BALCH SPRINGS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS BALCH SPRINGS
RELOCATION OF
FACILITIES SEPTEMBER
762 080.57435 (11)
INSTALL 13 FEET OF 2 INCH AND 1424 FEET OF 6 INCH POLY AND ABANDON 13
FEET OF 2 INCH POLY AND 1419 FEET OF 4 INCH STEEL ALONG HORSESHOE DRIVE
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SPRINGTOWN SYSTEM INTEGRITY SEPTEMBER
763 080.57437 113
INSTALL 1565 FEET OF 6 INCH STEEL ALONG AVENUE J ON LINE U AND ABANDON
1548 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MCCAULLEY SYSTEM INTEGRITY OCTOBER
764 080.57446 (0)
INSTALL (1) 120 WELD SLEEVE ON LINE D IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY SEPTEMBER
765 080.57448 382,965
INSTALL 3200 FEET OF 16 INCH STEEL ALONG LINE C16 AND ABANDON 3200 FEET
OF 16 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS BEDFORD SYSTEM INTEGRITY OCTOBER
766 080.57478 (0)
INSTALL 20 FEET OF 8 INCH STEEL ALONG ARAPAHO ROAD AND ABANDON 20 FEET
OF 8 INCH OF STEEL AND (ONE) 3 INCH VALVE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY SEPTEMBER
767 080.57492 (0)
INSTALL 2 INCH DISTRICT REGULATOR STATION AND ABANDON DISTRICT
REGULATOR STATION IN CITY OF ITALY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ITALY SYSTEM INTEGRITY SEPTEMBER
768 080.57493 (0)
INSTALL 268 FEET OF 4 INCH POLY AND ABANDON 145 FEET OF 3 INCH STEEL
ALONG OAK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER
769 080.57497 0
INSTALL 1747 FEET OF 4 INCH POLY AND ABANDON 1755 FEET OF 4 INCH STEEL
ALONG WALNUT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
770 080.57498 0
INSTALL 3100 FEET OF 2 INCH POLY ALONG STADIUM DRIVE ABANDON 1647 FEET
OF 2 INCH, AND 432 FEET OF 4 INCH STEEL, 613 FEET OF 2 INCH AND 132 FEET OF
4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ALVORD SYSTEM INTEGRITY SEPTEMBER
771 080.57499 24
INSTALL 4066 FEET OF 2 INCH POLY AND ABANDON 2281 FEET OF 4 INCH CAST
IRON AND 1051 FEET OF 4 INCH STEEL ALONG ARLINGTON STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
772 080.57502 7
INSTALL 1620 FEET OF 2 INCH POLY AND ABANDON 970 FEET OF 4 INCH AND 340
FEET OF 8 INCH CAST IRON ALONG MARNE STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
773 080.57503 11
INSTALL 1563 FEET OF 2 INCH POLY AND ABANDON 1890 FEET OF 4 INCH CAST
IRON ALONG STEPHENSON STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
774 080.57508 25
INSTALL 1566 FEET OF 4 INCH POLY AND ABANDON 1425 FEET OF 6 INCH, 1350
FEET OF 4 INCH CAST IRON AND 400 FEET OF 4 INCH STEEL ALONG SOUTH HILLS
AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
775 080.57509 1
INSTALL 1940 FEET OF 2 INCH POLY ALONG SAN CRISTOBAL ROAD AND ABANDON
2155 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
776 080.57510 1
INSTALL 1185 FEET OF 2 INCH POLY AND 355 FEET OF 4 INCH AND ABANDON 1531
FEET OF 6 INCH CAST IRON ALONG SAN LEANDRO STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
777 080.57525 94
INSTALL 1268 FEET OF 4 INCH POLY ALONG ASBURY ALLEY AND ABANDON 240
FEET OF 6 INCH STEEL AND 1490 FEET OF 6 INCH CAST IRON IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
778 080.57528 124
INSTALL 2671 FEET OF 4 INCH POLY ALONG MISSION AVENUE AND ABANDON 2000
FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
779 080.57529 1
RELOCATE FACILITIES. INSTALL 620 FEET OF 2 INCH POLY AND ABANDON 645
FEET OF 4 INCH STEEL ALONG LOCUST ROAD TO ACCOMMODATE THE CITY OF
FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
780 080.57540 21
INSTALL 330 FEET OF 2 INCH AND 1760 FEET OF 6 INCH POLY AND ABANDON 785
FEET OF 4 INCH, 330 FEET OF 6 INCH, AND 960 FEET OF 8 INCH CAST IRON ALONG
ERVAY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
781 080.57549 1
INSTALL 1675 FEET OF 2 INCH POLY AND ABANDON 1655 FEET OF 8 INCH CAST
IRON ALONG HOLLIS DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
782 080.57551 28
INSTALL 1464 FEET OF 2 INCH POLY ALONG LINCOLN AND ABANDON 1495 FEET
OF 4 INCH CAST IRON, 80 FEET OF 4 INCH POLY, 30 FEET OF 4 INCH AND 65 FEET
OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
783 080.57552 7
INSTALL 1550 FEET OF 2 INCH POLY AND ABANDON 1270 FEET OF 4 INCH CAST
IRON ALONG TIMOTHY DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
784 080.57568 125
RELOCATE FACILITIES. INSTALL 2898 FEET OF 4 INCH POLY ALONG GALVEZ AND
ABANDON 1607 FEET OF 4 INCH CAST IRON AND 1000 FEET OF 4 INCH STEEL TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
785 080.57579 2
INSTALL 1100 FEET OF 6 INCH AND 150 FEET OF 2 INCH POLY ALONG 22ND STREET
AND ABANDON 1100 FEET OF 8 INCH AND 150 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER
786 080.57580 4
RELOCATE FACILITIES. INSTALL 1124 FEET OF 2 INCH POLY AND ABANDON 464
FEET OF 2 INCH STEEL AND 646 FEET OF 2 INCH POLY ALONG ROBIN LANE TO
ACCOMMODATE CITY OF BERTRAM STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BERTRAM
RELOCATION OF
FACILITIES SEPTEMBER
787 080.57607 0
RELOCATE FACILITIES. INSTALL 265 FEET OF 2 INCH POLY AND ABANDON 370
FEET OF 3 INCH STEEL ALONG RANDOLPH STREET TO ACCOMMODATE CITY OF
BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES SEPTEMBER
MTX Additions
Page 24 of 178
243
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
788 080.57615 14
RELOCATE FACILITIES. INSTALL (99) POLY SERVICES AND ABANDON (99) STEEL
SERVICES ALONG CAPITAL STREET TO ACCOMMODATE CITY OF ARLINGTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES SEPTEMBER
789 080.57629 14
INSTALL (25) MOTORIZED REGULATORS AND ABANDON (25) REGULATORS IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
790 080.57630 (0)
INSTALL 15 FEET OF 2 INCH, 3 FEET OF 3 INCH AND 1441 FEET OF 4 INCH POLY
AND ABANDON 12 FEET OF 2 INCH, 2732 FEET OF 3 INCH AND 16 FEET OF 4 INCH
POLY ALONG KNOLLWOOD ROAD IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER
791 080.57632 (0)
INSTALL 107 FEET OF 2 INCH AND 377 FEET OF 4 INCH POLY AND ABANDON 282
FEET OF 2 INCH AND 191 FEET OF 4 INCH STEEL AND 47 FEET OF 2 INCH AND 11
FEET OF 4 INCH POLY ALONG JACKSON STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLEN ROSE SYSTEM INTEGRITY SEPTEMBER
792 080.57658 77
INSTALL 974 FEET OF 2 INCH AND 1451 FEET OF 4 INCH POLY AND ABANDON 1054
FEET OF 3 INCH AND 1600 FEET OF 6 INCH CAST IRON ALONG HILLCREST AVENUE
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER
793 080.57665 165
INSTALL 8 FEET OF 4 INCH AND 64 FEET OF 12 INCH STEEL ALONG MIDWAY ROAD
AND ABANDON 7 FEET OF 4 INCH AND 70 FEET OF 12 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER
794 080.57672 9
INSTALL 2691 FEET OF 2 INCH POLY AND ABANDON 1595 FEET OF 6 INCH, 1405
FEET OF 4 INCH CAST IRON, AND 40 FEET OF 6 INCH POLY ALONG GRASSMERE
LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER
795 080.57675 0
INSTALL 1000 FEET OF 2 INCH POLY ALONG FORT STREET AND ABANDON 1000
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS PALESTINE SYSTEM INTEGRITY SEPTEMBER
796 080.57679 135
INSTALL 2830 FEET OF 4 INCH POLY ALONG HARVARD AVENUE AND ABANDON
2090 FEET OF 4 INCH, 500 FEET OF 8 INCH, AND 380 FEET OF 6 INCH CAST IRON,
AND 360 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER
797 080.57693 9
INSTALL 2373 FEET OF 8 INCH STEEL AND ABANDON 2373 FEET OF 8 INCH STEEL
ALONG COUNTY ROAD 230 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WEINERT SYSTEM INTEGRITY SEPTEMBER
798 080.57697 (0)
INSTALL 660 FEET OF 2 INCH POLY AND ABANDON 660 FEET OF 2 INCH STEEL
ALONG GOSSETT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
799 080.57703 2
INSTALL 12983 FEET OF 4 INCH STEEL AND ABANDON 12988 FEET OF 4 INCH
STEEL ALONG LINE L26 IN COUNTY FALLS COUNTY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LOTT SYSTEM INTEGRITY SEPTEMBER
800 080.57711 1
RELOCATE FACILITIES. INSTALL 2500 FEET OF 4 INCH POLY ALONG NATIONAL
DRIVE AND ABANDON 2500 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
RELOCATION OF
FACILITIES SEPTEMBER
801 080.57716 (0)
INSTALL 300 FEET OF 2 INCH POLY ALONG CADDO STREET AND ABANDON 300
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS LIPAN SYSTEM INTEGRITY SEPTEMBER
802 080.57725 107
INSTALL 785 FEET OF 4 INCH AND 595 FEET OF 2 INCH POLY ALONG HUDNALL AND
ABANDON 660 FEET OF 8 INCH, 360 FEET OF 4 INCH AND 235 FEET OF 6 INCH CAST
IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
803 080.57729 0
RELOCATE FACILITIES. INSTALL 17 FEET OF 3 INCH AND 504 FEET OF 4 INCH POLY
AND ABANDON 500 FEET OF 4 INCH POLY ALONG AUSTIN STREET TO
ACCOMMODATE CITY OF KAUFMAN STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN
RELOCATION OF
FACILITIES SEPTEMBER
804 080.57747 9
INSTALL 1099 FEET OF 4 INCH POLY AND ABANDON 1005 FEET OF 4 INCH CAST
IRON ALONG HOPKINS ALLEY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
805 080.57753 1
INSTALL 1469 FEET OF 2 INCH POLY AND ABANDON 720 FEET OF 6 INCH CAST IRON
ALONG MAYFLOWER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
806 080.57754 70
INSTALL 2150 FEET OF 2 INCH POLY ALONG WEST COLORADO ROAD AND
ABANDON 1130 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
807 080.57755 0
RELOCATE FACILITIES. INSTALL 212 FEET OF 6 INCH POLY AND ABANDON 204
FEET OF 6 INCH CAST IRON ALONG WEST HAMMOND STREET TO ACCOMMODATE
CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
808 080.57756 32
INSTALL DISTRICT REGULATOR STATION AND VALVE AND ABANDON DISTRICT
REGULATOR STATION 58 ALONG BELT LINE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
809 080.57757 (0)
RELOCATE FACILITIES. INSTALL 216 FEET OF 6 INCH POLY AND ABANDON 204
FEET OF 6 INCH STEEL ALONG HEMPHILL STREET TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
810 080.57758 1
INSTALL 765 FEET OF 4 INCH POLY AND ABANDON 120 FEET OF 4 INCH AND 610
FEET OF 8 INCH STEEL ALONG WALNUT STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER
811 080.57763 2
RELOCATE FACILITIES. INSTALL 897 FEET OF 4 INCH AND 2 FEET OF 6 INCH POLY
AND ABANDON 564 FEET OF 4 INCH CAST IRON ALONG CARTWRIGHT AVENUE TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
812 080.57767 10
INSTALL 1268 FEET OF 2 INCH POLY AND ABANDON 1362 FEET OF 2 INCH POLY
ALONG RONIN LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BERTRAM SYSTEM INTEGRITY SEPTEMBER
813 080.57795 34
RELOCATE FACILITIES. INSTALL 585 FEET OF 2 INCH POLY ALONG PEARSON
AVENUE AND ABANDON 200 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES SEPTEMBER
814 080.57796 20
RELOCATE FACILITIES. INSTALL 6 POLY SERVICES ALONG TUCKER STREET AND
ABANDON (6) STEEL SERVICES TO ACCOMMODATE THE CITY OF MCKINNEY
CAPITAL IMPROVEMENT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES SEPTEMBER
815 080.57800 36
INSTALL 800 FEET OF 4 INCH POLY AND 200 FEET OF 8 INCH STEEL ALONG KATY
STREET AND ABANDON 800 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMO SYSTEM INTEGRITY SEPTEMBER
816 080.57809 (0)
INSTALL 13 FEET OF 2 INCH AND 737 FEET OF 4 INCH POLY AND ABANDON 725
FEET OF 2 INCH STEEL AND 8 FEET OF 2 INCH POLY ALONG BEZNER STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LINDSAY SYSTEM INTEGRITY SEPTEMBER
817 080.57818 1
INSTALL 430 FEET OF 2 INCH POLY ALONG ECHOLS STREET AND ABANDON 465
FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER
818 080.57820 (0)
INSTALL 671 FEET OF 2 INCH POLY AND ABANDON 200 FEET OF 2 INCH STEEL
AND 322 FEET OF 2 INCH POLY ALONG PLUM STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALDWELL SYSTEM INTEGRITY SEPTEMBER
819 080.57823 72
INSTALL 1810 FEET OF 2 INCH POLY ALONG INWOOD ROAD AND ABANDON 1425
FEET OF 4 INCH CAST IRON AND 385 FEET OF 6 INCH CAST IRON IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
820 080.57824 271
RELOCATE FACILITIES. INSTALL 2064 FEET OF 24 INCH STEEL ALONG WHEATLAND
ROAD AND ABANDON 1263 FEET OF 24 INCH STEEL TO ACCOMMODATE CITY OF
DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 25 of 178
244
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
821 080.57848 0
RELOCATE FACILITIES. INSTALL 720 FEET OF 2 INCH POLY ALONG CADDO STREET
AND ABANDON 105 FEET OF 2 INCH POLY AND 439 FEET OF 2 INCH STEEL TO
ACCOMMODATE CITY OF LIPAN STREET IMPROVEMENT PROJECT IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LIPAN
RELOCATION OF
FACILITIES SEPTEMBER
822 080.57852 4
RELOCATE FACILITIES. INSTALL 2456 FEET OF 2 INCH AND 3212 FEET OF 4 INCH
POLY ALONG CHIMNEY HILL DRIVE AND ABANDON 903 FEET OF 2 INCH AND 2080
FEET OF 3 INCH STEEL AND 1371 FEET OF 3 INCH POLY TO ACCOMMODATE CITY
OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES SEPTEMBER
823 080.57856 79
INSTALL 1768 FEET OF 2 INCH AND 374 FEET OF 4 INCH POLY ALONG GREENWAY
BOULEVARD AND ABANDON 1370 FEET OF 4 INCH AND 385 FEET OF 6 INCH CAST
IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
824 080.57859 97
INSTALL 1595 FEET OF 4 INCH AND 355 FEET OF 2 INCH POLY ALONG NEWMORE
STREET AND ABANDON 1595 FEET OF 6 FEET CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
825 080.57861 336
INSTALL 1120 FEET OF 2 INCH POLY AND 545 FEET OF 4 INCH POLY ALONG
MUNGER AVENUE. ABANDON 1105 FEET OF 4 INCH CAST IRON AND 1200 FEET OF 6
INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
826 080.57866 61
INSTALL 1634 FEET OF 2 INCH AND 710 FEET OF 4 INCH POLY ALONG NICHOLS
STREET AND ABANDON 114 FEET OF 2 INCH POLY, 3150 FEET OF 4 INCH CAST
IRON, 925 FEET OF 4 INCH STEEL, AND 326 FEET OF 6 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
827 080.57874 106
INSTALL 1440 FEET OF 4 INCH POLY ALONG ROSS AVENUE AND ABANDON 10 FEET
OF 4 INCH CAST IRON AND 1440 FEET OF 6 INCH CAST IRON AND 175 FEET OF 6
INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
828 080.57877 79
INSTALL 600 FEET OF 4 INCH AND ABANDON 600 FEET OF STEEL ALONG LINE W12-
1 IN WISE COUNTY IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE
8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY SEPTEMBER
829 080.57879 33
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION 01 IN CITY OF TERRELL IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY SEPTEMBER
830 080.57902 0
RELOCATE FACILITIES. INSTALL 56 FEET OF 6 INCH POLY ALONG PECAN LANE AND
ABANDON 56 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF MELISSA STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MELISSA
RELOCATION OF
FACILITIES SEPTEMBER
831 080.57904 4
INSTALL 1615 FEET OF 2 INCH POLY ALONG SUDBURY DRIVE AND ABANDON 1591
FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
832 080.57908 84
INSTALL 1035 FEET OF 2 INCH POLY ALONG EDGEFIELD STREET AND ABANDON
862 FEET OF 4 INCH AND 102 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
833 080.57909 (0)
RELOCATE FACILITIES. INSTALL 116 FEET OF 4 INCH POLY ALONG FAIRWAY
STREET AND ABANDON 113 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
WICHITA FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
RELOCATION OF
FACILITIES SEPTEMBER
834 080.57914 35
INSTALL 925 FEET OF 2 INCH AND 344 FEET OF 4 INCH POLY ALONG RAVENDALE
LANE AND ABANDON 915 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
835 080.57915 87
INSTALL 1730 FEET OF 2 INCH POLY AND ABANDON 1095 FEET OF 4 INCH AND 630
FEET OF 6 INCH CAST IRON ALONG AVALON AVENUE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
836 080.57916 0
RELOCATE FACILITIES. INSTALL 1876 FEET OF 2 INCH POLY ALONG THE STREET
OF ROBINSON AND ABANDON 723 FEET OF 2 INCH AND 6 FEET OF 3 INCH STEEL
AND 989 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ROBINSON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON
RELOCATION OF
FACILITIES SEPTEMBER
837 080.57924 4
INSTALL 1732 FEET OF 2 INCH POLY ALONG MLK BOULEVARD AND ABANDON 8
FEET OF 2 INCH AND 499 FEET OF 4 INCH POLY AND 993 FEET OF 6 INCH CAST
IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
838 080.57926 33
INSTALL 1820 FEET OF 2 INCH POLY ALONG MYRTLE STREET AND ABANDON 1240
FEET OF 8 INCH, 330 FEET OF 6 INCH, 120 FEET OF 4 INCH CAST IRON AND 130
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
839 080.57929 5
INSTALL 10 FEET OF 3 INCH AND 1908 FEET OF 4 INCH POLY ALONG DAVIS STREET
AND ABANDON 829 FEET OF 3 INCH AND 646 FEET OF 4 INCH STEEL AND 283 FEET
OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY SEPTEMBER
840 080.57932 1
INSTALL 208 FEET OF 2 INCH, 8 FEET OF 3 INCH AND 1579 FEET OF 4 INCH POLY
ALONG DANIELS DRIVE AND ABANDON 208 FEET OF 2 INCH AND 1733 FEET OF 4
INCH STEEL AND 61 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERENS SYSTEM INTEGRITY SEPTEMBER
841 080.57938 1,068
INSTALL 2125 FEET OF 2 INCH AND 3010 FEET OF 4 INCH POLY ALONG ELM STREET
AND ABANDON 1738 FEET OF 4 INCH CAST IRON, 2636 FEET OF 4 INCH, 1040 FEET
OF 6 INCH STEEL, AND 678 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
842 080.57940 13
INSTALL 500 FEET OF 4 INCH AND 225 FEET OF 2 INCH POLY ALONG ELM STREET
AND ABANDON 482 FEET OF 4 INCH AND 200 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER
843 080.57941 15
INSTALL 400 FEET OF 4 INCH AND 220 FEET OF 2 INCH POLY ALONG BRAZOS AND
ABANDON 400 FEET OF 4 INCH AND 380 FEET OF 3 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER
844 080.57944 8
INSTALL 350 FEET OF 2 INCH AND 1800 FEET OF 4 INCH POLY AND ABANDON 2482
FEET OF 4 INCH AND 571 FEET OF 6 INCH CAST IRON AND 2209 FEET OF 4 INCH
STEEL ALONG NOBLE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
845 080.57954 10
INSTALL 2 FEET OF 2 INCH AND 3296 FEET OF 4 INCH POLY ALONG RACE STREET
AND ABANDON 12 FEET OF 2 INCH AND 3323 FEET OF 4 INCH CAST IRON AND 5
FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
846 080.57959 1
RELOCATE FACILITIES. INSTALL 1283 FEET OF 2 INCH, 3 FEET OF 3 INCH AND 2688
FEET OF 4 INCH POLY ALONG LINDA LANE AND ABANDON 8 FEET OF 1.25 INCH,
1027 FEET OF 2 INCH, 2499 FEET OF 3 INCH AND 252 FEET OF 4 INCH POLY TO
ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES SEPTEMBER
847 080.57960 18
INSTALL 1470 FEET OF 2 INCH POLY ALONG POLK STREET AND ABANDON 1380
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
848 080.57963 7
INSTALL 2825 FEET OF 2 INCH AND 359 FEET OF 4 INCH POLY ALONG JUDD STREET
AND ABANDON 2616 FEET OF 4 INCH CAST IRON AND 207 FEET OF 4 INCH AND 349
FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
849 080.57964 110
RELOCATE FACILITIES. INSTALL 40 FEET OF 8 INCH STEEL AND 40 FEET OF 6 INCH
STEEL ALONG FM195 AND ABANDON 10 FEET OF 8 INCH STEEL AND 10 INCH POLY
TO ACCOMMODATE CITY OF PARIS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
RELOCATION OF
FACILITIES SEPTEMBER
850 080.57971 29
INSTALL 930 FEET OF 2 INCH AND 2065 FEET OF 4 INCH POLY ALONG MARSAILIS
STREET AND ABANDON 514 FEET OF 2 INCH AND 203 FEET OF 3 INCH AND 1926
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 26 of 178
245
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
851 080.57983 268,945
REPLACE REGULATOR STATIONS AT THE END OF LINE C22 ON THE SOUTHEAST
SIDE OF DFW AIRPORT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER
852 080.57985 77,493
INSTALL 22 FEET OF 8 INCH STEEL AND 4926 FEET OF 10 INCH STEEL AND
DISTRICT REGULATOR STATION AT DFW AIRPORT AND ABANDON 1213 FEET OF 8
INCH STEEL AND 1690 FEET OF 10 INCH STEEL AND DISTRICT REGULATOR
STATION ALONG DFW AIRPORT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY OCTOBER
853 080.57986 58,320
REPLACE MAINLINE VALVE AND STRADDLE ASSEMBLY AND DRS02 AT DFW
AIRPORT DUE TO NON-WORKING VALVES AND AGING INFRASTRUCTURE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY OCTOBER
854 080.57990 23
INSTALL DISTRICT REGULATOR STATION ALONG HOLLY AND ABANDON DISTRICT
REGULATOR STATION 01 IN CRANDALL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CRANDALL SYSTEM INTEGRITY SEPTEMBER
855 080.57991 7
INSTALL 3302 FEET OF 2 INCH POLY ALONG FERGUSON STREET AND ABANDON
3032 FEET OF 2 INCH STEEL AND 87 FEET OF 2 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE SYSTEM INTEGRITY SEPTEMBER
856 080.57992 10
INSTALL 1944 FEET OF 2 INCH POLY ALONG SAN LEANDRO STREET AND ABANDON
2012 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
857 080.57993 53
INSTALL 325 FEET OF 2 INCH AND 1350 FEET OF 4 INCH POLY AND ABANDON 1280
FEET OF 6 INCH CAST IRON AND 325 FEET OF 3 INCH POLY ALONG SAN BENITO
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
858 080.57997 125
INSTALL 2450 FEET OF 4 INCH AND 360 FEET OF 6 INCH POLY ALONG BEVERLY
AVENUE AND ABANDON 2810 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY SEPTEMBER
859 080.58003 1
INSTALL 845 FEET OF 2 INCH POLY ALONG WILDWOOD ROAD AND ABANDON 937
FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
860 080.58009 25
INSTALL 1354 FEET OF 2 INCH POLY ALONG HARWOOD AND ABANDON 345 FEET
OF 4 INCH AND 940 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
861 080.58012 27
INSTALL 1101 FEET OF 2 INCH POLY ALONG GANO AND ABANDON 1300 FEET OF 8
INCH STEEL, 530 FEET OF 4 INCH, 785 FEET OF 6 INCH AND 380 FEET OF 8 INCH
CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
862 080.58013 (19)
INSTALL 105 FEET OF 2 INCH, 32 FEET OF 4 INCH AND 2346 FEET OF 6 INCH POLY
ALONG WASHINGTON STREET AND ABANDON 233 FEET OF 2 INCH AND 5 FEET OF
4 INCH POLY AND 5 FEET OF 4 INCH, 6 FEET OF 3 INCH AND 2187 FEET OF 6 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY SEPTEMBER
863 080.58020 96
INSTALL 2250 FEET OF 2 INCH POLY AND ABANDON 1425 FEET OF 4 INCH, 305
FEET OF 6 INCH CAST IRON AND 170 FEET OF 4 INCH STEEL ALONG EDGEFIELD
ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
864 080.58023 46
INSTALL 1507 FEET OF 2 INCH POLY ALONG SIDNEY STREET AND ABANDON 1375
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
865 080.58024 322
INSTALL 1760 FEET OF 2 INCH POLY ALONG TODD STREET AND ABANDON 1520
FEET OF 4 INCH CAST IRON AND 290 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
866 080.58026 16
INSTALL 150 FEET OF 4 INCH POLY AND ABANDON (1) DISTRICT REGULATOR
STATION AND 8026 FEET OF 4 INCH STEEL ALONG PLANO ROAD IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY SEPTEMBER
867 080.58027 63
INSTALL 1580 FEET OF 2 INCH POLY ALONG TEXAS DRIVE AND ABANDON 1580
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
868 080.58029 20
INSTALL 925 FEET OF 2 INCH POLY AND ABANDON 885 FEET OF 4 INCH CAST IRON
ALONG OLD ORCHARD ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
869 080.58034 8
INSTALL 6 FEET OF 3 INCH AND 1749 FEET OF 4 INCH POLY AND ABANDON 1639
FEET OF 3 INCH, 206 FEET OF 4 INCH, 6 FEET OF 6 INCH STEEL AND 2 FEET OF 4
INCH POLY ALONG SYCAMORE STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY SEPTEMBER
870 080.58036 45
INSTALL 1520 FEET OF 2 INCH POLY ALONG ROLINDA DRIVE AND ABANDON 1520
FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
871 080.58037 192
INSTALL 1805 FEET OF 2 INCH POLY ALONG CUMBERLAND AND ABANDON 1290
FEET OF 4 INCH AND 515 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
872 080.58038 81
INSTALL 1745 FEET OF 2 INCH POLY ALONG STOREY STREET AND ABANDON 1230
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
873 080.58040 38
INSTALL 920 FEET OF 2 INCH AND 667 FEET OF 4 INCH POLY ALONG FOREST HILLS
AND ABANDON 525 FEET OF 8 INCH, 695 FEET OF 4 INCH CAST IRON AND 165 FEET
OF 8 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
874 080.58042 40
INSTALL 1365 FEET OF 4 INCH POLY ALONG SANTA CLARA AND ABANDON 475
FEET OF 8 INCH AND 775 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
875 080.58051 (0)
INSTALL (259) POLY SERVICES AND ABANDON (259) STEEL SERVICES ALONG
STREETS IN CITY OF TEMPLE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY SEPTEMBER
876 080.58052 12
RELOCATE FACILITIES. INSTALL 27 FEET OF 2 INCH POLY ALONG LONE STAR
DRIVE AND ABANDON 546 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
CEDAR PARK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR PARK
RELOCATION OF
FACILITIES SEPTEMBER
877 080.58054 30
INSTALL 5079 FEET OF 4 INCH POLY ALONG HIGHWAY 271 AND ABANDON 7 FEET
OF 4 INCH POLY AND 5064 FEET OF 8 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY SEPTEMBER
878 080.58055 (0)
INSTALL (124) POLY SERVICES AND ABANDON (124) STEEL SERVICES ALONG
STREETS IN CITY OF GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
879 080.58056 2
INSTALL (160) POLY SERVICES AND ABANDON (160) STEEL SERVICES ALONG
STREETS IN CITY OF DESOTO IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY SEPTEMBER
880 080.58060 134
INSTALL 3300 FEET OF 4 INCH POLY ALONG BEWICK AND ABANDON 380 FEET OF 6
INCH STEEL, 820 FEET OF 6 INCH, AND 1031 FEET OF 4 INCH CAST IRON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
881 080.58061 88
RELOCATE FACILITIES. INSTALL 2204 FEET OF 4 INCH POLY AND ABANDON 1950
FEET OF 4 INCH CAST IRON, 692 FEET OF 4 INCH STEEL, 163 FEET OF POLY ALONG
COVELO TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
882 080.58085 70
INSTALL 1635 FEET OF 4 INCH POLY ALONG CHEROKEE TRAIL AND ABANDON 1635
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
883 080.58086 75
INSTALL 1875 FEET OF 4 INCH POLY ALONG BLUFFVIEW ROAD AND ABANDON 490
FEET OF 4 INCH CAST IRON, 290 FEET OF 2 INCH STEEL, 660 FEET OF 8 INCH CAST
IRON, 85 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
884 080.58087 4
INSTALL (343) POLY SERVICES AND ABANDON (343) STEEL SERVICES ALONG
STREETS IN CITY OF ARLINGTON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 27 of 178
246
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
885 080.58088 192
INSTALL (393) POLY SERVICES ALONG STREETS OF ARLINGTON AND ABANDON
(393) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
886 080.58099 (0)
INSTALL 2207 FEET OF 2 INCH POLY ALONG GAY STREET AND ABANDON 12 FEET
OF 1.25 INCH POLY AND 2215 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRANKLIN SYSTEM INTEGRITY SEPTEMBER
887 080.58100 2,743
INSTALL 2744 FEET OF 2 INCH POLY AND ABANDON 2921 FEET OF 2 INCH STEEL
AND 50 FEET OF 4 INCH POLY ALONG SOUTH COLLEGE AVENUE IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
888 080.58101 40
INSTALL 1890 FEET OF 2 INCH POLY ALONG LAWRENCE AND ABANDON 1890 FEET
OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
889 080.58103 36
INSTALL 1750 FEET OF 2 INCH AND 50 FEET OF 4 INCH POLY ALONG LAWRENCE
AND ABANDON 950 FEET OF 4 INCH AND 680 FEET OF 6 INCH CAST IRON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
890 080.58104 7
INSTALL 60 FEET OF 2 INCH, 906 FEET OF 4 INCH AND 1907 FEET OF 6 INCH POLY
AND ABANDON 1018 FEET OF 2 INCH AND 1160 FEET OF 3 INCH STEEL AND 1025
FEET OF 3 INCH POLY ALONG PORCH STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TIOGA SYSTEM INTEGRITY SEPTEMBER
891 080.58105 190
INSTALL 13999 FEET OF 4 INCH POLY ALONG LINE M6 AND ABANDON 13878 FEET
OF 3 INCH STEEL AND 11 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FROST SYSTEM INTEGRITY SEPTEMBER
892 080.58107 20
INSTALL 361 FEET OF 2 INCH AND 936 FEET OF 4 INCH POLY ALONG 4TH STREET
AND ABANDON 330 FEET OF 2 INCH AND 1000 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER
893 080.58109 (0)
INSTALL 92 FEET OF 4 INCH POLY ALONG 11TH STREET AND ABANDON 24 FEET OF
2 INCH AND 68 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
894 080.58110 9
INSTALL 60 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION ALONG
CYPRESS AND ABANDON 196 FEET OF 2 INCH POLY AND DISTRICT REGULATOR
STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY SEPTEMBER
895 080.58112 (4)
INSTALL 26 FEET OF 8 INCH POLY ALONG SYCAMORE STREET AND ABANDON 24
FEET OF 8 INCH AND 2 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
896 080.58113 1
RELOCATE FACILITIES. INSTALL 861 FEET OF 2 INCH POLY ALONG FOCH STREET
AND ABANDON 970 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
897 080.58115 11
INSTALL (50) POLY SERVICE LINES AND ABANDON (50) COPPER SERVICE LINES
ALONG STREETS IN CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
898 080.58117 59
INSTALL 3375 FEET OF 2 INCH POLY ALONG DONALDSON STREET AND ABANDON
27 FEET OF 1.25 INCH, 797 FEET OF 2 INCH, 326 FEET OF 3 INCH AND 470 FEET OF
4 INCH POLY AND 1096 FEET OF 3 INCH, 550 FEET OF 4 INCH AND 363 FEET OF 2
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERENS SYSTEM INTEGRITY OCTOBER
899 080.58119 1
INSTALL 3146 FEET OF 2 INCH POLY ALONG DONALDSON STREET AND ABANDON
150 FEET OF 2 INCH, 1760 FEET OF 4 INCH, 740 FEET OF 3 INCH STEEL, 150 FEET
OF 3 INCH AND 500 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERENS SYSTEM INTEGRITY SEPTEMBER
900 080.58131 3
RELOCATE FACILITIES. INSTALL 87 FEET OF 2 INCH AND 3 FEET OF 4 INCH POLY
ALONG JOMAR LANE AND ABANDON 81 FEET OF 2 INCH AND 9 FEET OF 4 INCH
POLY TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES SEPTEMBER
901 080.58147 (0)
RELOCATE FACILITIES. INSTALL (5) POLY SERVICE LINES AND ABANDON (5) POLY
SERVICES ALONG MCGREGOR STREET TO ACCOMMODATE CITY OF MCGREGOR
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO
RELOCATION OF
FACILITIES SEPTEMBER
902 080.58149 13
INSTALL 1200 FEET OF 2 INCH POLY ALONG COUNTY ROAD 1020 AND ABANDON
720 FEET OF STEEL AND 480 FEET OF 2 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER
903 080.58153 39
INSTALL 1800 FEET OF 6 INCH AND 60 FEET OF 2 INCH POLY ALONG MOCKINGBIRD
LANE AND ABANDON 20 FEET OF 4 INCH POLY, 85 FEET OF 2 INCH POLY, 1715
FEET OF 2 INCH STEEL AND 55 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY SEPTEMBER
904 080.58154 515
INSTALL 3600 FEET OF 2 INCH POLY AND ABANDON 3400 FEET OF 4 INCH STEEL
ALONG ADELAIDE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY OCTOBER
905 080.58158 57
INSTALL 45 FEET OF 8 INCH STEEL ALONG WILLIAMS DRIVE AND ABANDON (2) 8
INCH STEEL VALVES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY SEPTEMBER
906 080.58159 135
INSTALL 2885 FEET OF 4 INCH POLY AND ABANDON 884 FEET OF 4 INCH, 997 FEET
OF 6 INCH CAST IRON, 345 FEET OF 2 INCH STEEL ALONG RETTA IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
907 080.58161 68
INSTALL 2226 FEET OF 2 INCH, 11 FEET OF 3 INCH, AND 66 FEET OF 4 INCH POLY
AND ABANDON 151 FEET OF 3 INCH, 2458 FEET OF 4 INCH STEEL, 7 FEET OF 3
INCH AND 65 FEET OF 4 INCH POLY ALONG JAMES STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY SEPTEMBER
908 080.58162 30
RELOCATE FACILITIES. INSTALL (52) POLY SERVICES ALONG SOUTHMOOR ROAD
AND ABANDON (52) POLY SERVICES TO ACCOMMODATE CITY OF ARLINGTON
PAVING AND DRAINAGE PLAN IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES SEPTEMBER
909 080.58167 60
INSTALL 1900 FEET OF 6 INCH AND 320 FEET OF 2 INCH POLY ALONG HACKBERRY
AND ABANDON 411 FEET OF 2 INCH, 1595 FEET PF 8 INCH STEEL AND 997 FEET OF
2 INCH AND 30 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER
910 080.58169 2
ABANDON 57 FEET OF 24 INCH STEEL ALONG LINE CA (3RD) IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AZLE SYSTEM INTEGRITY SEPTEMBER
911 080.58172 12
RELOCATE FACILITIES. INSTALL (16) POLY SERVICES ALONG BRIAR HILL ROAD
AND ABANDON (16) POLY SERVICES TO ACCOMMODATE CITY OF GRAND PRAIRIE
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES SEPTEMBER
912 080.58174 17
INSTALL 430 FEET OF 4 INCH POLY AND ABANDON 440 FEET OF 4 INCH STEEL AND
5 FEET OF 4 INCH POLY ALONG WEST PIONEER PARKWAY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER
913 080.58192 (0)
INSTALL 3 INCH VALVE AND ABANDON 3 INCH VALVE ON DISTRICT REGULATOR
STATION ALONG BEAVER STREET IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY SEPTEMBER
914 080.58195 1
RELOCATE FACILITIES. INSTALL 296 FEET OF 6 INCH POLY ALONG MCDERMOTT
ROAD AND ABANDON 264 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES SEPTEMBER
915 080.58204 3
INSTALL 1401 FEET OF 2 INCH POLY ALONG AVENUE F AND ABANDON 1141 FEET
OF 4 INCH STEEL AND 264 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
916 080.58212 19
INSTALL 1465 FEET OF 4 INCH POLY ALONG HILLCREST DRIVE AND ABANDON 1460
FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
917 080.58217 77
INSTALL 1821 FEET OF 2 INCH POLY AND 157 FEET OF 4 INCH POLY AND 2241
FEET OF 6 INCH POLY AND ABANDON 1055 FEET OF 2 INCH STEEL AND 140 FEET
OF 2 INCH POLY AND 144 FEET OF 4 INCH STEEL AND 2611 FEET OF 6 INCH STEEL
ALONG PRESTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 28 of 178
247
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
918 080.58218 23
INSTALL 2105 FEET OF 2 INCH POLY ALONG MAPLE DRIVE AND ABANDON 2100
FEET OF 2 INCH STEEL ALONG LAKESIDE STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
919 080.58225 49
INSTALL 264 FEET OF 2 INCH POLY AND 1590 FEET OF 4 INCH POLY AND ABANDON
45 FEET OF 2 INCH, 1574 FEET OF 3 INCH AND 225 FEET OF 6 INCH STEEL ALONG
TRAVIS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
920 080.58229 1
INSTALL 427 FEET OF 2 INCH POLY ALONG MEADOW LAKE AVENUE AND ABANDON
408 FEET OF 2 INCH STEEL AND 8 FEET OF 2 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
921 080.58233 3
RELOCATE FACILITIES. INSTALL 20 FEET OF 2 INCH POLY ALONG CLIFF VIEW AND
ABANDON 90 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
922 080.58234 0
INSTALL 17 FEET OF 2 INCH AND 2 FEET OF 3 INCH STEEL AND ABANDON 6 FEET
OF 2 INCH AND 2 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
923 080.58242 5
INSTALL 670 FEET OF 2 INCH POLY ALONG CROCKETT STREET AND ABANDON 887
FEET OF 2 INCH AND 43 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER
924 080.58252 6
INSTALL 300 FEET OF 4 INCH POLY AND ABANDON 300 FEET OF 8 INCH, 119 FEET
OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY ALONG RANDOLPH STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER
925 080.58254 7
INSTALL 400 FEET OF 4 INCH POLY AND ABANDON 5 FEET OF 3 INCH POLY AND
385 FEET OF 4 INCH STEEL ALONG SCHOPMEYER STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE SYSTEM INTEGRITY SEPTEMBER
926 080.58258 12
RELOCATE FACILITIES. INSTALL 263 FEET OF 2 INCH POLY ALONG CHESTNUT
STREET AND ABANDON 263 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES SEPTEMBER
927 080.58265 48
INSTALL 1242 FEET OF 2 INCH AND 3508 FEET OF 4 INCH POLY ALONG OLD
ORCHARD STREET AND ABANDON 1213 FEET OF 2 INCH AND 3425 FEET OF 3 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
928 080.58267 118
INSTALL 220 FEET OF 2 INCH, 2940 FEET OF 4 INCH AND 270 FEET OF 6 INCH
ALONG 1ST STREET AND ABANDON 4000 FEET OF 2 INCH, 3 INCH, AND 6 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MOODY SYSTEM INTEGRITY SEPTEMBER
929 080.58276 60
INSTALL 1950 FEET OF 2 INCH POLY ALONG CANTEY AND ABANDON 1629 FEET OF
4 INCH CAST IRON AND 65 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
930 080.58306 35
INSTALL 1375 FEET OF 2 INCH POLY ALONG GLEN GARDEN AND ABANDON 301
FEET OF 4 INCH AND 886 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
931 080.58320 3
RELOCATE FACILITIES. INSTALL 1173 FEET OF 2 INCH AND 212 FEET OF 4 INCH
POLY ALONG ANNA DRIVE AND ABANDON 944 FEET OF 3 INCH STEEL AND 364
FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF ALLEN STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN
RELOCATION OF
FACILITIES SEPTEMBER
932 080.58327 38
RELOCATE FACILITIES. INSTALL 1525 FEET OF 4 INCH POLY ALONG VINSON AND
ABANDON 1525 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
933 080.58329 22
INSTALL 3 FEET OF 3 INCH POLY AND 803 FEET OF 4 INCH POLY AND ABANDON
652 FEET OF 3 INCH STEEL, 100 FEET OF 3 INCH POLY, AND 6 FEET OF 4 INCH
POLY ALONG SHAWNEE TRACE STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER
934 080.58330 4
INSTALL 2609 FEET OF 2 INCH AND 3210 FEET OF 4 INCH POLY ALONG MCKENZIE
AVENUE AND ABANDON 2460 FEET OF 2 INCH, 2660 FEET OF 3 INCH AND 354 FEET
OF 6 INCH STEEL AND 237 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER
935 080.58340 0
RELOCATE FACILITIES. INSTALL 130 FEET OF 6 INCH POLY ALONG RANDOL MILL
ROAD AND ABANDON 130 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
936 080.58359 140
RELOCATE FACILITIES. INSTALL 470 FEET OF 2 INCH AND 339 FEET OF 4 INCH
POLY AND ABANDON 472 FEET OF 2 INCH POLY AND 347 FEET OF 4 INCH STEEL
ALONG WINDSOR TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
937 080.58361 99
INSTALL 2000 FEET OF 2 INCH AND 50 FEET OF 6 INCH POLY ALONG BOOKER AND
ABANDON 221 FEET OF 4 INCH CAST IRON, 1500 FEET OF 2 INCH, AND 500 FEET OF
4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
938 080.58372 1,649
INSTALL 1300 FEET OF 2 INCH POLY ALONG THE STREETS OF COUNTRY WAY.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROWLETT GROWTH OCTOBER
939 080.58373 199
INSTALL 25 FEET OF 3 INCH, 34 FEET OF 6 INCH, 42 FEET OF 8 INCH STEEL AND 5
FEET OF 8 INCH POLY AND DISTRICT REGULATOR STATION AT RED OAKS AND
ABANDON DISTRICT REGULATOR STATION AND 59 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RED OAK SYSTEM INTEGRITY OCTOBER
940 080.58384 0
RELOCATE FACILITIES. INSTALL 43 FEET OF 2 INCH AND 268 FEET OF 4 INCH AND
4417 FEET OF 6 INCH POLY ALONG FM 664 AND ABANDON 80 FEET OF 2 INCH, 208
FEET OF 4 INCH AND 4390 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
OVILLA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OVILLA
RELOCATION OF
FACILITIES SEPTEMBER
941 080.58387 8
INSTALL 360 FEET OF 2 INCH POLY ALONG 5TH STREET AND ABANDON 297 FEET
OF 2 INCH AND 3 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER
942 080.58413 5,155
INSTALL 8638 FEET OF 2 INCH AND 2142 FEET OF 4 INCH POLY ALONG STREETS OF
THE COLLINSBROOK FARMS PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH SEPTEMBER
943 080.58429 (0)
INSTALL 492 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 482 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS BLANKET SYSTEM INTEGRITY SEPTEMBER
944 080.58444 33
INSTALL 450 FEET OF 6 INCH AND 280 FEET OF 4 INCH POLY ALONG HINTON AND
ABANDON 161 FEET OF 3 INCH, 231 FEET OF 2 INCH, 196 FEET OF 2 INCH STEEL
AND 219 FEET OF POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS TIOGA SYSTEM INTEGRITY SEPTEMBER
945 080.58451 5,995
RELOCATE FACILITIES. INSTALL 473 FEET OF 2 INCH POLY AND 8 FEET OF 3 INCH
POLY AND 3874 FEET OF 4 INCH POLY AND ABANDON 1780 FEET OF 2 INCH STEEL
AND 1676 FEET OF 3 INCH STEEL ALONG LENNOX DRIVE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
946 080.58452 9
RELOCATE FACILITIES. INSTALL (22) POLY SERVICES AND ABANDON (22) STEEL
SERVICES ALONG LANGLEY AVENUE TO ACCOMMODATE CITY OF EVERMAN
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN
RELOCATION OF
FACILITIES SEPTEMBER
947 080.58460 0
INSTALL 1667 FEET OF 2 INCH POLY AND ABANDON 1402 FEET OF 2 INCH POLY
ALONG HEMPHILL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS AVALON SYSTEM INTEGRITY SEPTEMBER
948 080.58462 1,134
INSTALL 1620 FEET OF 2 INCH POLY AND ABANDON 1384 FEET OF 2 INCH POLY
ALONG KIRBY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS AVALON SYSTEM INTEGRITY OCTOBER
949 080.58469 33
RELOCATE FACILITIES. INSTALL 35 FEET OF 4 INCH POLY ALONG 2ND STREET AND
ABANDON 4021 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 29 of 178
248
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
950 080.58480 3
INSTALL 2180 FEET OF 4 INCH POLY AND ABANDON 1480 FEET OF 2 INCH POLY
ALONG ZMOLEK ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ALMA SYSTEM INTEGRITY SEPTEMBER
951 080.58484 68
RELOCATE FACILITIES. INSTALL 1362 FEET OF 2 INCH AND 328 FEET OF 4 INCH
POLY ALONG MCKINNEY AVENUE AND ABANDON 30 FEET OF 2 INCH STEEL AND
1136 FEET OF 2 INCH AND 328 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF
DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES SEPTEMBER
952 080.58485 29
RELOCATE FACILITIES. INSTALL (58) POLY SERVICES ALONG BIGGS TERRACE AND
ABANDON (58) STEEL SERVICES TO ACCOMMODATE CITY OF ARLINGTON PAVING
AND STORM DRAINAGE PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES SEPTEMBER
953 080.58490 42
RELOCATE FACILITIES. INSTALL 760 FEET OF 2 INCH POLY AND ABANDON 497
FEET OF 2 INCH STEEL AND 158 FEET OF 2 INCH POLY ALONG BUMPAS STREET
TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES SEPTEMBER
954 080.58494 1
RELOCATE FACILITIES. INSTALL 227 FEET OF 4 INCH POLY ALONG DOMINIK DRIVE
AND ABANDON 227 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF COLLEGE
STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
RELOCATION OF
FACILITIES SEPTEMBER
955 080.58499 20
RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH POLY ALONG CLARK ROAD
AND ABANDON 287 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CEDAR HILL
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL
RELOCATION OF
FACILITIES SEPTEMBER
956 080.58508 3,299
INSTALL 4230 FEET OF 2 INCH POLY ALONG STREETS OF THE STONEY CREEK
PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SUNNYVALE GROWTH MARCH
957 080.58509 4
INSTALL 860 FEET OF 4 INCH POLY ALONG ROCKWOOD LANE AND ABANDON 853
FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER
958 080.58514 59
RELOCATE FACILITIES. INSTALL 1832 FEET OF 4 INCH POLY ALONG UNIVERSITY
AVENUE AND ABANDON 1834 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
RELOCATION OF
FACILITIES SEPTEMBER
959 080.58515 2
INSTALL 10 FEET OF 8 INCH AND 20 FEET OF 4 INCH POLY ALONG GOODNIGHT
LANE AND ABANDON 10 FEET OF 8 INCH AND 20 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
960 080.58544 3,299
INSTALL 1605 FEET OF 2 INCH POLY ALONG THE STREETS OF STONEY CREEK
PHASE 5 SECTION 3. RESIDENTIAL SUNNYVALE GROWTH OCTOBER
961 080.58545 61
RELOCATE FACILITIES. INSTALL 1055 FEET OF 4 INCH AND 340 FEET OF 6 INCH
POLY ALONG TRAIL LAKE AND ABANDON 1060 FEET OF 2 INCH STEEL TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
962 080.58551 (0)
RELOCATE FACILITIES. INSTALL 31 FEET OF 4 INCH POLY ALONG CONCHO ROAD
AND ABANDON 25 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
963 080.58564 0
RELOCATE FACILITIES. INSTALL 344 FEET OF 4 INCH POLY ALONG VICKERY
STREET AND ABANDON 326 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY
OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
964 080.58577 78
RELOCATE FACILITIES. INSTALL 975 FEET OF 6 INCH POLY AND 600 FEET OF 10
INCH STEEL AND ABANDON 600 FEET OF 6 INCH STEEL, 375 FEET OF 6 INCH POLY
AND 600 FEET OF 10 INCH STEEL ALONG MCDERMOTT DRIVE TO ACCOMMODATE
CITY OF ALLEN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN
RELOCATION OF
FACILITIES SEPTEMBER
965 080.58583 8
INSTALL WELD-OVER SLEEVE ALONG LINE XT25 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN SYSTEM INTEGRITY SEPTEMBER
966 080.58587 1
RELOCATE FACILITIES. INSTALL 321 FEET OF 4 INCH POLY ALONG NORTHWOOD
STREET AND ABANDON 321 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
RELOCATION OF
FACILITIES SEPTEMBER
967 080.58590 651
RELOCATE FACILITIES. INSTALL 4089 FEET OF 16 INCH STEEL AND ABANDON 20
FEET OF 12 INCH AND 3965 FEET OF 18 INCH STEEL ALONG PIPELINE ROAD TO
ACCOMMODATE CITY OF HURST STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST
RELOCATION OF
FACILITIES OCTOBER
968 080.58593 47
INSTALL 1930 FEET OF 2 INCH POLY AND ABANDON 1930 FEET OF 4 INCH CAST
IRON ALONG LATTA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
969 080.58594 13
INSTALL 1540 FEET OF 2 INCH POLY ALONG LATTA AND ABANDON 1250 FEET OF 4
INCH AND 210 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
970 080.58598 175
INSTALL DISTRICT REGULATOR STATION, 10 FEET OF 3 INCH AND 297 FEET OF 8
INCH STEEL AND ABANDON 6321 FEET OF 3 INCH STEEL ALONG LINE L21 AT
LIMMER LOOP IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS HUTTO SYSTEM INTEGRITY OCTOBER
971 080.58608 3
RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH POLY ALONG TWIGHLIGHT
AND ABANDON 450 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
RELOCATION OF
FACILITIES SEPTEMBER
972 080.58610 7
INSTALL 548 FEET OF 2 INCH POLY ALONG YOUNG DRIVE AND ABANDON 540 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS KILLEEN SYSTEM INTEGRITY SEPTEMBER
973 080.58618 35
INSTALL 1375 FEET OF 2 INCH POLY AND ABANDON 855 FEET OF 4 INCH AND 464
FEET OF 8 INCH CAST IRON ALONG HERALD STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
974 080.58619 113
INSTALL 1394 FEET OF 2 INCH POLY AND ABANDON 538 FEET OF 4 INCH AND 141
FEET OF 6 INCH AND 424 FEET OF 8 INCH CAST IRON ALONG ELSIE FAYE HEGGINS
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
975 080.58620 59
INSTALL 25 FEET OF 2 INCH AND 1300 FEET OF 4 INCH POLY ALONG ALONG EAST
12TH AND ABANDON 1530 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
976 080.58621 6
INSTALL 1130 FEET OF 2 INCH POLY ALONG CUMBERLAND AVENUE AND ABANDON
795 FEET OF 4 INCH AND 330 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
977 080.58622 18
INSTALL 1146 FEET OF 2 INCH POLY AND ABANDON 504 FEET OF 2 INCH POLY AND
712 FEET OF 4 INCH STEEL AND DRS20 ALONG 11TH STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY SEPTEMBER
978 080.58630 26
RELOCATE FACILITIES. INSTALL 310 FEET OF 6 INCH POLY MAIN AND ABANDON
300 FEET OF 6 INCH POLY ALONG THROCKMORTON ROAD TO ACCOMMODATE CITY
OF MELISSA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA
RELOCATION OF
FACILITIES SEPTEMBER
979 080.58634 45
RELOCATE FACILITIES. INSTALL 1100 FEET OF 4 INCH POLY AND ABANDON 1040
FEET STEEL ALONG SOUTH DRIVE TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
980 080.58635 25
INSTALL 578 FEET OF 2 INCH POLY ALONG NORTHWEST HIGHWAY AND ABANDON
365 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
981 080.58639 805
INSTALL 2360 FEET OF 2 INCH POLY AND ABANDON 2360 FEET OF 4 INCH STEEL
ALONG CAMBRIDGE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER
982 080.58640 202
INSTALL 2174 FEET OF 4 INCH POLY AND ABANDON 1937 FEET OF 6 INCH CAST
IRON ALONG NORTH PLYMOUTH IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 30 of 178
249
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
983 080.58646 4
RELOCATE FACILITIES. INSTALL 603 FEET OF 4 INCH POLY AND ABANDON 586
FEET OF 3 INCH STEEL AND 1221 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY
OF EASTLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND
RELOCATION OF
FACILITIES SEPTEMBER
984 080.58658 5,371
RELOCATE FACILITIES. INSTALL 1859 FEET OF 2 INCH POLY AND 1321 FEET OF 4
INCH POLY ALONG FM51 AND ABANDON 1235 FEET OF 2 INCH STEEL AND 225
FEET OF 2 INCH POLY AND 120 FEET OF 4 INCH STEEL AND 150 FEET OF 4 INCH
POLY TO ACCOMMODATE CITY OF SPRINGTOWN STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SPRINGTOWN
RELOCATION OF
FACILITIES OCTOBER
985 080.58669 4
RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH POLY AND ABANDON 113
FEET OF 2 INCH POLY ALONG BRANDYWINE STREET TO ACCOMMODATE CITY OF
DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES SEPTEMBER
986 080.58670 14
RELOCATE FACILITIES. INSTALL 130 FEET OF 6 INCH AND 20 FEET OF 4 INCH POLY
AND ABANDON 110 FEET OF 6 INCH AND 15 FEET OF 3 INCH STEEL ALONG NEW
YORK AVENUE TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES SEPTEMBER
987 080.58684 (0)
RELOCATE FACILITIES. INSTALL 14 FEET OF 4 INCH POLY ALONG CANONGATE AND
ABANDON 10 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FLOWER MOUND
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
RELOCATION OF
FACILITIES SEPTEMBER
988 080.58691 96
INSTALL 269 FEET OF 2 INCH AND 415 FEET OF 6 INCH POLY ALONG 1ST STREET
AND ABANDON 269 FEET OF 2 INCH AND 414 FEET OF 6 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY SEPTEMBER
989 080.58692 17,231
INSTALL 25 FEET OF 2 INCH POLY AND 10 FEET OF 3 INCH POLY AND 26 FEET OF 4
INCH POLY AND 40 FEET OF 6 INCH POLY AND 4003 FEET OF 8 INCH POLY ALONG
NORTHWOOD DRIVE AND ABANDON 30 FEET OF 2 INCH POLY AND 25 FEET OF 3
INCH POLY AND 15 FEET OF 4 INCH POLY AND 60 FEET OF 6 INCH STEEL AND 3970
FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS MARBLE FALLS SYSTEM INTEGRITY OCTOBER
990 080.58693 2
INSTALL 487 FEET OF 6 INCH POLY ALONG VIRGINIA STREET AND ABANDON 425
FEET OF 6 INCH STEEL AND 25 FEET OF 6 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY SEPTEMBER
991 080.58694 4
RELOCATE FACILITIES. INSTALL 110 FEET OF 4 INCH POLY ALONG TEXAS AVENUE
AND ABANDON 110 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF BRYAN
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES SEPTEMBER
992 080.58708 103
INSTALL 3061 FEET OF 4 INCH POLY AND ABANDON 920 FEET OF 4 INCH CAST
IRON, 200 FEET OF 4 INCH POLY AND 1466 FEET OF 4 INCH STEEL ALONG WAITS
AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
993 080.58712 45
INSTALL 2010 FEET OF 2 INCH POLY AND ABANDON 981 FEET OF 4 INCH CAST
IRON, 384 FEET OF 4 INCH POLY, 1825 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
994 080.58713 0
RELOCATE FACILITIES. INSTALL 50 FEET OF 2 INCH POLY AND ABANDON 50 FEET
OF 2 INCH STEEL TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES SEPTEMBER
995 080.58714 3
INSTALL 469 FEET OF 4 INCH POLY AND ABANDON 462 FEET OF 4 INCH STEEL
ALONG GILMER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY SEPTEMBER
996 080.58723 5
RELOCATE FACILITIES. INSTALL 125 FEET OF 2 INCH POLY ALONG SAGEWOOD
STREET AND ABANDON 120 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES SEPTEMBER
997 080.58726 520
RELOCATE FACILITIES. INSTALL 60 FEET OF 6 INCH POLY AND ABANDON 60 FEET
OF 6 INCH STEEL ALONG CONGRESS STREET TO ACCOMMODATE CITY OF DENTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
998 080.58733 5
RELOCATE FACILITIES. INSTALL 70 FEET OF 2 INCH POLY AND (1) POLY SERVICE
AND ABANDON (1) POLY SERVICE ALONG WHITNEY COURT TO ACCOMMODATE
CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
999 080.58734 105
RELOCATE FACILITIES. INSTALL 630 FEET OF 2 INCH AND 2803 FEET OF 4 INCH
POLY AND ABANDON 2272 FEET OF 2 INCH AND 768 FEET OF 3 INCH STEEL ALONG
ANITA AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1000 080.58735 26
INSTALL 1750 FEET OF 2 INCH POLY AND ABANDON 330 FEET OF 8 INCH CAST IRON
AND 1750 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1001 080.58737 0
INSTALL 27 FEET OF 20 INCH STEEL AND ABANDON 27 FEET OF 24 INCH STEEL
ALONG LINE CA (2ND)(WEST) IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SPRINGTOWN SYSTEM INTEGRITY SEPTEMBER
1002 080.58738 17
RELOCATE FACILITIES. INSTALL 410 FEET OF 4 INCH POLY ALONG PECAN STREET
AND ABANDON 410 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF CELINA
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA
RELOCATION OF
FACILITIES SEPTEMBER
1003 080.58740 7,010
INSTALL 4000 FEET OF 4 INCH AND 4100 FEET OF 2 INCH POLY ALONG STREETS OF
BAYSIDE WEST PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROWLETT GROWTH JANUARY
1004 080.58748 63
INSTALL (160) POLY SERVICES AND ABANDON (160) STEEL SERVICES ALONG
STREETS OF ROSEBUD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ROSEBUD SYSTEM INTEGRITY SEPTEMBER
1005 080.58750 81
INSTALL 3326 FEET OF 4 INCH POLY ALONG LAWNWOOD AND ABANDON 1205 FEET
OF 4 INCH, 1498 FEET OF 6 INCH CAST IRON, 462 FEET OF 2 INCH, AND 560 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1006 080.58751 86
RELOCATE FACILITIES. INSTALL 61 FEET OF 2 INCH, 10 FEET OF 4 INCH AND 1099
FEET OF 6 INCH POLY AND ABANDON 62 FEET OF 2 INCH AND 977 FEET OF 4 INCH
STEEL AND 15 FEET OF 2 INCH POLY ALONG US377 TO ACCOMMODATE CITY OF
ROANOKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROANOKE
RELOCATION OF
FACILITIES OCTOBER
1007 080.58753 9,070
RELOCATE FACILITIES. INSTALL 396 FEET OF 2 INCH, 306 FEET OF 6 INCH, AND 248
FEET OF 8 INCH POLY AND ABANDON 36 FEET OF 2 INCH POLY, 240 FEET OF 2
INCH, 289 FEET OF 6 INCH AND 204 FEET OF 8 INCH STEEL TO ACCOMMODATE
CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
RELOCATION OF
FACILITIES OCTOBER
1008 080.58755 60
RELOCATE FACILITIES. INSTALL 4400 FEET OF 2 INCH POLY ALONG COTTON
STREET AND ABANDON 4743 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
RELOCATION OF
FACILITIES SEPTEMBER
1009 080.58756 120
INSTALL 4 FEET OF 2 INCH POLY AND 4084 FEET OF 4 INCH POLY ALONG GALVEZ
AND ABANDON 840 FEET OF 2 INCH AND 561 FEET OF 4 INCH POLY AND 2092 FEET
OF 4 INCH AND 1072 FEET OF 6 INCH AND 167 FEET OF 8 INCH CAST IRON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1010 080.58788 1,308
RELOCATE FACILITIES. INSTALL 125 OF 2 INCH POLY ALONG ARCHER AND
ABANDON 440 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DENTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1011 080.58791 3,154
RELOCATE FACILITIES. INSTALL 110 FEET OF 6 INCH POLY AND ABANDON 5 FEET
OF 6 INCH STEEL AND 105 FEET OF 6 INCH POLY ALONG WOODBROOK ST AND
SOUTHRIDGE DR TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 31 of 178
250
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1012 080.58792 (163)
RELOCATE FACILITIES. INSTALL 75 FEET OF 2 INCH POLY AND 2400 FEET OF 4
INCH POLY AND ABANDON 25 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH
POLY AND 1825 FEET OF 4 INCH STEEL AND 585 FEET OF 4 INCH POLY ALONG
CHESTNUT STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1013 080.58796 13
RELOCATE FACILITIES. INSTALL 6 POLY SERVICES AND ABANDON 6 STEEL
SERVICES ALONG TIMBERIDGE STREET TO ACCOMMODATE CITY OF DENTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES SEPTEMBER
1014 080.58797 89
RELOCATE FACILITIES. INSTALL 315 FEET OF 2 INCH POLY ALONG SHERATON
STREET AND ABANDON 315 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1015 080.58798 21
RELOCATE FACILITIES. INSTALL 250 FEET OF 2 INCH POLY AND ABANDON 250
FEET OF 2 INCH POLY ALONG PLUM HOLLOW STREET TO ACCOMMODATE CITY OF
DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES SEPTEMBER
1016 080.58800 30,534
RELOCATE FACILITIES. INSTALL 1154 FEET OF 2 INCH POLY AND ABANDON 248
FEET OF 2 INCH STEEL AND 38 FEET OF 2 INCH POLY AND 804 FEET OF 4 INCH
STEEL ALONG SOUTH AVENUE TO ACCOMMODATE CITY OF DENTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1017 080.58801 28
RELOCATE FACILITIES. INSTALL 748 FEET OF 2 INCH POLY AND ABANDON 746
FEET OF 2 INCH STEEL ALONG PANHANDLE STREET TO ACCOMMODATE CITY OF
DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES SEPTEMBER
1018 080.58806 497
RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH POLY AND ABANDON 74 FEET
OF 2 INCH POLY ALONG HENDERSON DRIVE TO ACCOMMODATE CITY OF DENTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1019 080.58807 3,886
RELOCATE FACILITIES. INSTALL 11 POLY SERVICES AND ABANDON 11 STEEL
SERVICES ALONG PAISLEY STREET TO ACCOMMODATE CITY OF DENTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1020 080.58815 3,093
INSTALL 6354 FEET OF 2 INCH AND 4147 FEET OF 6 INCH POLY ALONG STREETS OF
WOLF RANCH PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH NOVEMBER
1021 080.58816 2,062
INSTALL 792 FEET OF 2 INCH AND 372 FEET OF 4 INCH AND 1395 FEET OF 6 INCH
POLY ALONG STREETS OF SADDLE CREED. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
1022 080.58817 2,268
INSTALL 810 FEET OF 2 INCH AND 1230 FEET OF 4 INCH POLY ALONG STREETS OF
SADDLE CREEK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
1023 080.58824 22
RELOCATE FACILITIES. INSTALL 716 FEET OF 2 INCH POLY AND ABANDON 681
FEET OF 2 INCH POLY ALONG CHERRY DRIVE TO ACCOMMODATE CITY OF
PRINCETON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PRINCETON
RELOCATION OF
FACILITIES SEPTEMBER
1024 080.58830 144
RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY AND 900 FEET OF 6
INCH STEEL AND ABANDON 700 FEET OF 2 INCH POLY AND 800 FEET OF 6 INCH
STEEL ALONG 24TH ROAD TO ACCOMMODATE CITY OF EULESS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS EULESS
RELOCATION OF
FACILITIES SEPTEMBER
1025 080.58831 73
RELOCATE FACILITIES. INSTALL 160 FEET OF 2 INCH POLY AND ABANDON 160
FEET OF 2 INCH POLY ALONG HILL ALLEY TO ACCOMMODATE CITY OF DENTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1026 080.58834 27,498
RELOCATE FACILITIES. INSTALL 160 FEET OF 2 INCH AND 545 FEET OF 4 INCH
POLY AND ABANDON 226 FEET OF 2 INCH STEEL AND 908 FEET OF 4 INCH STEEL
ALONG MAIN STREET TO ACCOMMODATE CITY OF DENTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1027 080.58837 8,611
RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH AND 60 FEET OF 6 INCH POLY
ALONG FORREST RIDGE DRIVE AND ABANDON 90 FEET OF 1.25 INCH, 20 FEET OF 2
INCH , AND 60 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1028 080.58849 0
RELOCATE FACILITIES. INSTALL 16 FEET OF 2 INCH, 2 FEET OF 3 INCH AND 142
FEET OF 4 INCH POLY ALONG CHURCH STREET AND ABANDON 45 FEET OF 2 INCH
AND 116 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF GAINESVILLE STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
RELOCATION OF
FACILITIES SEPTEMBER
1029 080.58860 15
INSTALL 298 FEET OF 4 INCH POLY AND ABANDON 264 FEET OF 8 INCH CAST IRON
ALONG LOVERS LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1030 080.58863 81
RELOCATE FACILITIES. INSTALL 1873 FEET OF 2 INCH POLY ALONG ECTOR AND
ABANDON 1120 FEET OF 2 INCH STEEL AND 631 FEET OF 2 INCH POLY TO
ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES SEPTEMBER
1031 080.58866 402
RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH AND 60 FEET OF 4 INCH POLY
ALONG LAGUNA STREET AND ABANDON 120 FEET OF 2 INCH POLY AND 60 FEET
OF 4 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1032 080.58867 66
RELOCATE FACILITIES. INSTALL 870 FEET OF 6 INCH POLY AND ABANDON 870
FEET OF 6 INCH STEEL ALONG ALONG CAMDEN COURT TO ACCOMMODATE CITY
OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES SEPTEMBER
1033 080.58871 463
RELOCATE FACILITIES. INSTALL 160 FEET OF 2 INCH POLY AND 2200 FEET OF 4
INCH POLY ALONG PAISLEY AND ABANDON 365 FEET OF 2 INCH STEEL AND 450
FEET OF 2 INCH POLY AND 715 FEET OF 3 INCH STEEL AND 630 FEET OF 3 INCH
POLY AND 260 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1034 080.58872 7,085
RELOCATE FACILITIES. INSTALL 233 FEET OF 2 INCH POLY AND 71 FEET OF 4 INCH
POLY AND 182 FEET OF 6 INCH POLY AND ABANDON 200 FEET OF 2 INCH STEEL
AND 71 FEET OF 4 INCH POLY AND 195 FEET OF 6 INCH STEEL ALONG HILLCREST
STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1035 080.58878 36
INSTALL 1692 FEET OF 2 INCH AND 256 FEET OF 4 INCH POLY ALONG BALDWIN
STREET AND ABANDON 2505 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1036 080.58879 153
INSTALL 387 FEET OF 8 INCH STEEL AND ABANDON 330 FEET OF 8 INCH STEEL
ALONG PLANO ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY SEPTEMBER
1037 080.58880 38
INSTALL 1 FEET OF 2 INCH AND 1534 FEET OF 4 INCH POLY AND ABANDON 1555
FEET OF 4 INCH CAST IRON AND 75 FEET OF 4 INCH POLY ALONG BOWLING
AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1038 080.58881 785
INSTALL 542 FEET OF 2 INCH POLY AND 1816 FEET OF 6 INCH POLY ALONG
COLORADO STREET AND ABANDON 2270 FEET OF 6 INCH CAST IRON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1039 080.58882 197
INSTALL 1418 FEET OF 2 INCH AND 635 FEET OF 4 INCH POLY ALONG AVALON
DRIVE AND ABANDON 915 FEET OF 6 INCH AND 1350 FEET OF 8 INCH CAST IRON
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 32 of 178
251
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1040 080.58883 246
INSTALL 796 FEET OF 2 INCH POLY AND 12 FEET OF 3 INCH POLY AND 1941 FEET
OF 4 INCH POLY AND ABANDON 2224 FEET OF 3 INCH STEEL ALONG RIDGEWOOD
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE SYSTEM INTEGRITY OCTOBER
1041 080.58888 52
INSTALL 1250 FEET OF 2 INCH POLY AND ABANDON 990 FEET OF 4 INCH CAST IRON
ALONG LORNA LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1042 080.58890 143
INSTALL 448 FEET OF 2 INCH POLY AND 4498 FEET OF 4 INCH POLY AND ABANDON
68 FEET OF 2 INCH STEEL AND 3639 FEET OF 2 INCH POLY ALONG STATE HIGHWAY
34 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AVALON SYSTEM INTEGRITY OCTOBER
1043 080.58891 39
RELOCATE FACILITIES. INSTALL 760 FEET OF 2 INCH POLY ALONG FOARD STREET
AND ABANDON 800 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1044 080.58895 0
INSTALL 504 FEET OF 2 INCH POLY ALONG CHERRY STREET AND ABANDON 801
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS TEAGUE SYSTEM INTEGRITY SEPTEMBER
1045 080.58896 2
INSTALL 45 FEET OF 12 INCH STEEL AND ABANDON 45 FEET OF 12 INCH STEEL
ALONG LINE CA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1046 080.58899 34
INSTALL 2200 FEET OF 2 INCH POLY ALONG OLD BLOOMING GROVE AND ABANDON
2200 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS AVALON SYSTEM INTEGRITY SEPTEMBER
1047 080.58900 58
INSTALL 2281 FEET OF 2 INCH POLY AND ABANDON 931 FEET OF 4 INCH AND 1124
FEET OF 6 INCH CAST IRON ALONG SUDBURY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1048 080.58901 29
INSTALL 869 FEET OF 2 INCH AND 342 FEET OF 4 INCH POLY AND ABANDON 935
FEET OF 8 INCH CAST IRON ALONG SAINT MORITZ IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1049 080.58903 77
INSTALL 470 FEET OF 2 INCH POLY AND 1035 FEET OF 4 INCH POLY AND ABANDON
1105 FEET OF 2 INCH POLY AND 56 FEET OF 4 INCH STEEL ALONG SISSOM STREET
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AVALON SYSTEM INTEGRITY SEPTEMBER
1050 080.58907 332
INSTALL 1700 FEET OF 4 INCH, 1500 FEET OF 2 INCH, 800 FEET OF 4 INCH POLY
ALONG WALNUT STREET AND ABANDON 4000 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE SYSTEM INTEGRITY OCTOBER
1051 080.58911 7
INSTALL REGULATOR AND ABANDON 4 INCH EMCO REGULATOR AT PARIS
DISTRICT REGULATOR 16 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY SEPTEMBER
1052 080.58921 31
RELOCATE FACILITIES. INSTALL 100 FEET OF 6 INCH AND 60 FEET OF 2 INCH POLY
ALONG DYSON AND ABANDON 100 FEET OF 6 INCH, 30 FEET OF 2 INCH POLY, AND
65 FEET OF 1.25 INCH STEEL TO ACCOMMODATE CITY OF DALLAS TXDOT
RELOCATION PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
1053 080.58928 80
RELOCATE FACILITIES. INSTALL 2225 FEET OF 4 INCH POLY AND ABANDON 572
FEET OF 2 INCH POLY AND 335 FEET OF 4 INCH POLY AND 1540 FEET OF 4 INCH
STEEL ALONG HICKORY STREET TO ACCOMMODATE CITY OF DENTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1054 080.58929 5,821
RELOCATE FACILITIES. INSTALL 1285 FEET OF 4 INCH, 558 FEET OF 2 INCH, 216
FEET OF 2 INCH POLY ALONG HICKORY STREET AND ABANDON 1284 FEET OF 4
INCH STEEL TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1055 080.58942 98
INSTALL 267 FEET OF 2 INCH POLY AND 1981 FEET OF 4 INCH POLY ALONG
UNIVERSITY AND ABANDON 1507 FEET OF 4 INCH AND 1797 FEET OF 6 INCH AND
2286 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1056 080.58945 56
INSTALL 162 FEET OF 2 INCH AND 906 FEET OF 4 INCH POLY ALONG RUGGED AND
ABANDON 1050 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1057 080.58946 43
INSTALL 1137 FEET OF 2 INCH AND 3 FEET OF 4 INCH POLY ALONG ELMWOOD AND
ABANDON 1555 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1058 080.58951 1,612
INSTALL 670 FEET OF 2 INCH AND 3398 FEET OF 4 INCH POLY AND ABANDON 2498
FEET OF 4 INCH AND 1499 FEET OF 6 INCH CAST IRON ALONG WINTON TERRACE
WEST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1059 080.58952 6
INSTALL 142 FEET OF 8 INCH POLY ALONG LUNA ROAD AND ABANDON 142 FEET
OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1060 080.58961 624
INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 116 FEET OF 1.25 INCH POLY
AND 465 FEET OF 2 INCH POLY ALONG PIN OAK STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
1061 080.58965 55
INSTALL 1080 FEET OF 2 INCH AND 540 FEET OF 4 INCH POLY ALONG LOVERS AND
ABANDON 1080 FEET OF 4 INCH AND 540 FEET OF 6 INCH CAST IRON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER
1062 080.58969 551
INSTALL 325 FEET OF 2 INCH POLY AND 3015 FEET OF 4 INCH POLY ALONG
MEDFORD COURT AND ABANDON 2851 FEET OF 4 INCH, 2718 FEET OF 6 INCH
STEEL, 768 FEET OF 6 INCH AND 222 FEET OF 4 INCH CAST IRON IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1063 080.58970 103
INSTALL 1318 FEET OF 2 INCH POLY ALONG ASBURY STREET AND ABANDON 10
FEET OF 2 INCH POLY AND 1300 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER
1064 080.58974 97
INSTALL (364) POLY SERVICES ALONG STREETS OF DUNCANVILLE AND ABANDON
(364) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY SEPTEMBER
1065 080.58976 55
INSTALL 1975 FEET OF 2 INCH AND 1185 FEET OF 4 INCH POLY ALONG EVANS AND
ABANDON 570 FEET OF 2 INCH, 346 FEET OF 3 INCH, 665 FEET OF 4 INCH STEEL,
120 FEET OF 2 INCH, 250 FEET OF 3 INCH AND 475 FEET OF 4 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY SEPTEMBER
1066 080.58978 11
INSTALL 315 FEET OF 2 INCH POLY AND ABANDON 470 FEET OF 2 INCH STEEL
ALONG EAST IRVING STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY SEPTEMBER
1067 080.58980 254
INSTALL 22 FEET OF 2 INCH AND 2135 FEET OF 4 INCH POLY ALONG ASBURY
STREET AND ABANDON 5 FEET OF 4 INCH AND 1500 FEET OF 6 INCH CAST IRON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER
1068 080.58982 15
INSTALL 622 FEET OF 4 INCH POLY ALONG AVENUE J AND ABANDON 595 FEET OF 4
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY SEPTEMBER
1069 080.58991 1
ABANDON 297 FEET OF 3 INCH STEEL ALONG SPRUCE STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST SYSTEM INTEGRITY SEPTEMBER
1070 080.58999 1,209
INSTALL 460 FEET OF 2 INCH POLY AND 4551 FEET OF 4 INCH POLY ALONG
GREENE AVENUE AND ABANDON 2208 FEET OF 4 INCH STEEL, 785 FEET OF 4
INCH, 658 FEET OF 6 INCH CAST IRON AND 72 FEET OF 4 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1071 080.59003 1
INSTALL 258 FEET OF 4 INCH POLY AND ABANDON 52 FEET OF 4 INCH STEEL AND
260 FEET OF 4 INCH POLY ALONG CLAY STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY SEPTEMBER
1072 080.59007 46
RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH AND 400 FEET OF 4 INCH
POLY ALONG ANITA AVENUE AND ABANDON 800 FEET OF 2 INCH AND 432 FEET OF
4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
MTX Additions
Page 33 of 178
252
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1073 080.59008 51
RELOCATE FACILITIES. INSTALL 1200 FEET OF 2 INCH POLY ALONG ANNA DRIVE
AND ABANDON 100 FEET OF 2 INCH POLY, 200 FEET OF 2 INCH, AND 900 FEET OF 3
INCH STEEL TO ACCOMMODATE CITY OF ALLEN STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN
RELOCATION OF
FACILITIES SEPTEMBER
1074 080.59014 40
INSTALL 1320 FEET OF 2 INCH POLY ALONG DAY AND ABANDON 1040 FEET OF 4
INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1075 080.59016 47
INSTALL 1450 FEET OF 2 INCH POLY ALONG DAY STREET AND ABANDON 1450 FEET
OF 4 INCH CAST IRON ALONG DAY STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1076 080.59020 6,556
INSTALL 419 FEET OF 2 INCH POLY AND 4165 FEET OF 4 INCH POLY AND ABANDON
75 FEET OF 2 INCH POLY AND 1249 FEET OF 3 INCH POLY AND 1447 FEET OF 4
INCH POLY AND 4423 FEET OF 6 INCH CAST IRON AND 305 FEET OF 6 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1077 080.59021 113
INSTALL (450) POLY SERVICES ALONG SCEYENE AND ABANDON (450) STEEL
SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1078 080.59031 119
INSTALL 3061 FEET OF 4 INCH POLY ALONG MINDEN STREET AND ABANDON 1131
FEET OF 4 INCH STEEL AND 767 FEET OF 6 INCH CAST IRON AND 182 FEET OF 6
INCH POLY AND 320 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1079 080.59039 2
INSTALL DISTRICT REGULATOR STATION ALONG FM 455 AND ABANDON DISTRICT
REGULATOR STATION 07 IN ANNA IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ANNA SYSTEM INTEGRITY SEPTEMBER
1080 080.59050 21
INSTALL 1723 FEET OF 2 INCH POLY ALONG MAGNOLIA AND ABANDON 1680 FEET
OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CHANDLER SYSTEM INTEGRITY SEPTEMBER
1081 080.59051 249
INSTALL 2545 FEET OF 2 INCH POLY AND 555 FEET OF 4 INCH POLYAND ABANDON
2545 FEET OF 4 INCH CAST IRON, 30 FEET OF 6 INCH CAST IRON, AND 525 FEET OF
4 INCH POLY ALONG SAN BENITO WAY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1082 080.59052 12
INSTALL 1010 FEET 2 INCH AND 110 FEET OF 4 INCH POLY ALONG RHONES
QUARTER AND ABANDON 600 FEET OF 2 INCH AND 400 FEET OF 2 INCH AND 300
FEET OF 1.25 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS TYLER SYSTEM INTEGRITY SEPTEMBER
1083 080.59054 9
INSTALL 336 FEET OF 2 INCH POLY ALONG MURCHISON AND ABANDON 334 FEET
OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FRANKSTON SYSTEM INTEGRITY SEPTEMBER
1084 080.59055 34
INSTALL 413 FEET OF 4 INCH POLY ALONG PRAIRIEVILLE STREET AND ABANDON
115 FEET OF 3 INCH STEEL AND 201 FEET OF 4 INCH STEEL AND 133 FEET OF 4
INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY OCTOBER
1085 080.59060 192
INSTALL 469 FEET OF 2 INCH POLY AND 2036 FEET OF 4 INCH POLY AND ABANDON
1840 FEET OF 6 INCH CAST IRON ALONG SANTA CLARA DRIVE IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1086 080.59062 46,071
RELOCATE FACILITIES. INSTALL 535 FEET OF 2 INCH POLY AND 5751 FEET OF 4
INCH POLY AND ABANDON 4105 FEET OF 2 INCH STEEL AND 937 FEET OF 4 INCH
STEEL AND 4087 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF LONGVIEW
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
RELOCATION OF
FACILITIES OCTOBER
1087 080.59064 134
INSTALL 169 FEET OF 2 INCH AND 3460 FEET OF 4 INCH POLY ALONG BIDDISON
AND ABANDON 788 FEET OF 6 INCH, 475 FEET OF 4 INCH CAST IRON AND 2525
FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1088 080.59068 421
INSTALL 1815 FEET OF 4 INCH POLY AND ABANDON 1690 FEET OF 6 INCH CAST
IRON ALONG LOVERS LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1089 080.59069 107
INSTALL 1940 FEET OF 2 INCH POLY AND ABANDON 1590 FEET OF 4 INCH CAST
IRON AND 395 FEET OF 6 INCH CAST IRON ALONG MORTON STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1090 080.59070 2
INSTALL 285 FEET OF 4 INCH POLY ALONG PECAN STREET AND ABANDON 110
FEET OF 2 INCH AND 128 FEET OF 3 INCH AND 47 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST SYSTEM INTEGRITY SEPTEMBER
1091 080.59074 33
INSTALL 1092 FEET OF 2 INCH AND 426 FEET OF 4 INCH POLY ALONG SAN PEDRO
AND ABANDON 790 FEET OF 8 INCH AND 420 FEET OF 4 INCH CAST IRON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1092 080.59075 49
INSTALL 445 FEET OF 4 INCH AND 1030 FEET OF 2 INCH POLY ALONG SAN BENITO
AND ABANDON 790 FEET OF 4 INCH, 445 FEET OF 8 INCH CAST IRON AND 240 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1093 080.59078 104
INSTALL 3115 FEET OF 4 INCH POLY ALONG GREENE AND ABANDON 2104 FEET OF
4 INCH, 360 FEET OF 6 INCH STEEL, 434 FEET OF 4 INCH CAST IRON AND 195 FEET
OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1094 080.59090 18
RELOCATE FACILITIES. INSTALL 560 FEET OF 4 INCH POLY ALONG BROADWAY
STREET AND ABANDON 315 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF
PROSPER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PROSPER
RELOCATION OF
FACILITIES SEPTEMBER
1095 080.59093 2
RELOCATE FACILITIES. INSTALL 20 FEET OF 4 INCH POLY ALONG PROCTOR
AVENUE AND ABANDON 12 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF
WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES SEPTEMBER
1096 080.59100 9
INSTALL 485 FEET OF 2 INCH POLY ALONG SEQUOIA DRIVE AND ABANDON MAIN
LINE REGULATOR 29 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS TYLER SYSTEM INTEGRITY SEPTEMBER
1097 080.59117 302
RELOCATE FACILITIES. INSTALL 5 FEET OF 2 INCH POLY AND 611 FEET OF 4 INCH
POLY AND 7055 FEET OF 8 INCH POLY ALONG MARTOP ROAD AND ABANDON 100
FEET OF 2 INCH POLY AND 7673 FEET OF 4 INCH POLY AND 5 FEET OF 6 INCH POLY
AND 142 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF AUBREY STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS AUBREY
RELOCATION OF
FACILITIES OCTOBER
1098 080.59124 2,165
INSTALL 3921 FEET OF 2 INCH AND 1394 FEET OF 4 INCH POLY ALONG THE
STREETS OF THE WESTON RIDGE SUBDIVISION PHASE 1. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL MCKINNEY GROWTH SEPTEMBER
1099 080.59132 112
INSTALL (169) POLY SERVICES ALONG STREETS OF FREDERICKSBURG AND
ABANDON (169) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG SYSTEM INTEGRITY SEPTEMBER
1100 080.59135 10,074
INSTALL 800 FEET OF 20 INCH STEEL AND ABANDON 800 FEET OF 20 INCH ON LINE
D ALONG WEBB CHAPEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1101 080.59140 2
INSTALL RELIEF VALVE AND ABANDON RELIEF VALVE AT DISTRICT REGULATOR
STATION 01 IN CLYDE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CLYDE SYSTEM INTEGRITY SEPTEMBER
1102 080.59142 386,164
INSTALL 4800 FEET OF 20 INCH STEEL ALONG 645 NORTH TOWN EAST BOULEVARD
AND ABANDON 4780 FEET OF 20 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY OCTOBER
1103 080.59144 7
RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG SH 10 AND
ABANDON 83 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF EULESS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS EULESS
RELOCATION OF
FACILITIES SEPTEMBER
1104 080.59153 49
INSTALL 500 FEET OF 2 INCH AND 935 FEET OF 4 INCH POLY ALONG FOREST PARK
AND ABANDON 1823 FEET OF 4 INCH CAST IRON AND 131 FEET OF 4 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 34 of 178
253
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1105 080.59157 48
RELOCATE FACILITIES. INSTALL 1600 FEET OF 2 INCH POLY AND ABANDON 1600
FEET OF 2 INCH STEEL IN FORT WORTH ON CHEROKEE TRAIL TO ACCOMMODATE
CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1106 080.59162 4
RELOCATE FACILITIES. INSTALL 85 FEET OF 2 INCH STEEL ALONG FM 1174 AND
ABANDON 121 FEET OF .75 INCH POLY SERVICES TO ACCOMMODATE TXDOT
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS BERTRAM
RELOCATION OF
FACILITIES SEPTEMBER
1107 080.59165 322
RELOCATE FACILITIES. INSTALL 800 FEET OF 24 INCH STEEL ALOND PARKDALE
BOULEVARD AND ABANDON 903 FEET OF 24 INCH STEEL TO ACCOMMODATE CITY
OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
1108 080.59167 22
RELOCATE FACILITIES. INSTALL 40 FEET OF 2 INCH AND 690 FEET OF 4 INCH POLY
ALONG CENTER AND ABANDON 71 FEET OF 2 INCH AND 653 FEET OF 4 INCH STEEL
TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
RELOCATION OF
FACILITIES SEPTEMBER
1109 080.59172 26
RELOCATE FACILITIES. INSTALL 905 FEET OF 2 INCH POLY AND ABANDON 1632
FEET OF 2 INCH STEEL ALONG CONRAD HILTON TO ACCOMMODATE CITY OF
CISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO
RELOCATION OF
FACILITIES SEPTEMBER
1110 080.59173 29
INSTALL 680 FEET OF 2 INCH AND 98 FEET OF 4 INCH POLY AND ABANDON 840
FEET OF 3 INCH STEEL AND 1077 FEET OF 4 INCH POLY ALONG STREETS OF
DAWSON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DAWSON SYSTEM INTEGRITY SEPTEMBER
1111 080.59175 28
RELOCATE FACILITIES. INSTALL 1637 FEET OF 2 INCH POLY AND 132 FEET OF 4
INCH POLY AND ABANDON 1380 FEET OF 2 INCH STEEL AND 1398 FEET OF 2 INCH
POLY AND 140 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF GARLAND
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
1112 080.59176 19
RELOCATE FACILITIES. INSTALL 15 FEET OF 6 INCH POLY ALONG ABRAMS ROAD
AND ABANDON 6 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF PLANO
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES SEPTEMBER
1113 080.59199 71
INSTALL (70) POLY SERVICES ALONG STREETS OF FORT WORTH AND ABANDON
(70) COPPER SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1114 080.59202 87
INSTALL 3225 FEET OF 4 INCH POLY ALONG MASON AND ABANDON 1316 FEET OF 4
INCH CAST IRON, 710 FEET OF 6 INCH, 120 FEET OF 4 INCH STEEL, AND 290 FEET
OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1115 080.59214 104
INSTALL 297 FEET OF 2 INCH POLY AND 1021 FEET OF 4 INCH POLY AND ABANDON
633 FEET OF 4 INCH AND 1246 FEET OF 8 INCH CAST IRON ALONG HOLMES STREET
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1116 080.59215 4
RELOCATE FACILITIES. INSTALL 139 FEET OF 4 INCH POLY ALONG CARTER STREET
AND ABANDON 55 FEET OF 4 INCH STEEL AND 80 FEET OF 4 INCH POLY TO
ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES SEPTEMBER
1117 080.59216 712
INSTALL 1874 FEET OF 2 INCH POLY AND 1580 FEET OF 4 INCH POLY ALONG
SANGER AVENUE AND ABANDON 515 FEET OF 4 INCH, 290 FEET OF 6 INCH, AND
715 FEET OF 8 INCH CAST IRON, 1280 FEET OF 4 INCH AND 10 FEET OF 8 INCH
POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1118 080.59221 50
RELOCATE FACILITIES. INSTALL 760 FEET OF 4 INCH POLY ALONG WACO DRIVE
AND ABANDON 766 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WACO
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES SEPTEMBER
1119 080.59261 58
INSTALL 1025 FEET OF 2 INCH POLY AND 545 FEET OF 4 INCH POLY ALONG NOB
HILL ROAD AND ABANDON 1025 FEET OF 4 INCH AND 545 FEET OF 6 INCH CAST
IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1120 080.59268 45
INSTALL 742 FEET OF 2 INCH POLY AND 494 FEET OF 4 INCH POLY ALONG KNOTT
PLACE AND ABANDON 1267 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1121 080.59269 38
INSTALL AC MITIGATION ALONG LINE DT1 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1122 080.59272 135
INSTALL 979 FEET OF 2 INCH POLY AND 4115 FEET OF 4 INCH POLY ALONG
LANCASTER STREET AND ABANDON 1931 FEET OF 4 INCH, 779 FEET OF 6 INCH
STEEL, 1923 FEET OF 6 INCH, 915 FEET OF 4 INCH CAST IRON AND 546 FEET OF 4
INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1123 080.59274 2
RELOCATE FACILITIES. ABANDON 38 FEET OF 3 INCH STEEL TO ACCOMMODATE
CITY OF TEMPLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
RELOCATION OF
FACILITIES SEPTEMBER
1124 080.59277 19
INSTALL 950 FEET OF 4 INCH POLY ALONG 19TH STREET AND ABANDON 645 FEET
OF 8 INCH, 76 FEET OF 6 INCH, 230 FEET OF 4 INCH, 21 FEET OF 3 INCH STEEL AND
13 FEET OF 8 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY SEPTEMBER
1125 080.59288 134
INSTALL 2435 FEET OF 2 INCH POLY AND 5387 FEET OF 6 INCH POLY AND
ABANDON 6674 FEET OF 2 INCH STEEL ALONG SWANA DRIVE IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TIOGA SYSTEM INTEGRITY OCTOBER
1126 080.59292 54
RELOCATE FACILITIES. INSTALL 579 FEET OF 2 INCH AND 650 FEET OF 4 INCH
POLY ALONG WOODY LANE AND ABANDON 472 FEET OF 2 INCH AND 573 FEET OF 4
INCH STEEL TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
RELOCATION OF
FACILITIES SEPTEMBER
1127 080.59293 136
INSTALL 4598 FEET OF 4 INCH POLY ALONG WILSON ROAD AND ABANDON 1624
FEET OF 3 INCH STEEL AND 2314 FEET OF 3 INCH POLY AND 399 FEET OF 4 INCH
STEEL AND 514 FEET OF 4 INCH POLY AND 613 FEET OF 6 INCH CAST IRON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1128 080.59307 30
INSTALL 13 FEET OF 2 INCH AND 280 FEET OF 4 INCH POLY AND ABANDON 228
FEET OF 2 INCH POLY AND 275 FEET OF 4 INCH STEEL ALONG NAVASOTA ALLEY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GROESBECK SYSTEM INTEGRITY OCTOBER
1129 080.59309 135
INSTALL (313) POLY SERVICES AND ABANDON (313) STEEL SERVICES ALONG
STREETS OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY SEPTEMBER
1130 080.59330 19,898
RELOCATE FACILITIES. INSTALL 827 FEET OF 2 INCH POLY AND 4121 FEET OF 4
INCH POLY AND ABANDON 90 FEET OF 2 INCH STEEL AND 827 FEET OF 2 INCH
POLY AND 145 FEET OF 4 INCH STEEL AND 3976 FEET OF 4 INCH POLY ALONG
CHATTEY ROAD TO ACCOMMODATE CITY OF DESOTO STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO
RELOCATION OF
FACILITIES OCTOBER
1131 080.59331 3,425
RELOCATE FACILITIES. INSTALL 1385 FEET OF 6 INCH POLY AND ABANDON 1208
FEET OF 6 INCH POLY ALONG MAIN STREET TO ACCOMMODATE CITY OF DESOTO
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO
RELOCATION OF
FACILITIES OCTOBER
1132 080.59332 (0)
ABANDON 363 FEET OF 3 INCH STEEL, 176 FEET OF 3 INCH POLY AND 59 FEET OF 4
INCH POLY ALONG 3RD STREET IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 35 of 178
254
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1133 080.59335 1
RELOCATE FACILITIES. INSTALL 65 FEET OF 2 INCH POLY ALONG BASTROP
STREET AND ABANDON 60 INCH OF 2 INCH STEEL TO ACCOMMODATE CITY OF
MANOR STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANOR
RELOCATION OF
FACILITIES SEPTEMBER
1134 080.59337 23
INSTALL 790 FEET OF 2 INCH POLY ALONG LINDA LANE AND ABANDON 790 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY SEPTEMBER
1135 080.59339 122
INSTALL 945 FEET OF 2 INCH POLY ALONG INWOOD ROAD AND ABANDON 1000
FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1136 080.59340 53
INSTALL 358 FEET OF 2 INCH POLY AND 1699 FEET OF 4 INCH POLY ALONG
KENWELL STREET AND ABANDON 181 FEET OF 3 INCH AND 1664 FEET OF 8 INCH
CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1137 080.59342 164
INSTALL 1965 FEET OF 2 INCH AND 350 FEET OF 4 INCH POLY ALONG LOMO ALTO
AND ABANDON 1420 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER
1138 080.59344 103
INSTALL 667 FEET OF 2 INCH AND 911 FEET OF 4 INCH POLY ALONG THE STREETS
OF SADDLE CREEK 2E. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
1139 080.59345 373
INSTALL 1225 FEET OF 2 INCH POLY ALONG ROSEDALE AVENUE AND ABANDON
1065 FEET OF 4 INCH AND 360 FEET OF 6 INCH CAST IRON AND 210 FEET OF 2 INCH
POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER
1140 080.59346 332
INSTALL 52 FEET OF 2 INCH POLY AND 1823 FEET OF 4 INCH POLY ALONG ABBOT
AVENUE AND ABANDON 1200 FEET OF 4 INCH AND 325 FEET OF 6 INCH CAST IRON
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY OCTOBER
1141 080.59347 45
INSTALL 1023 FEET OF 2 INCH POLY ALONG GILLON AVENUE AND ABANDON 100
FEET OF 3 INCH, 900 FEET OF 4 INCH, 550 FEET OF 8 INCH CAST IRON AND 27 FEET
OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY SEPTEMBER
1142 080.59348 6,001
INSTALL 2062 FEET OF 2 INCH POLY AND 546 FEET OF 4 INCH POLY AND ABANDON
770 FEET OF 4 INCH CAST IRON MAIN AND 1050 FEET OF 6 INCH CAST IRON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1143 080.59350 1,348
INSTALL 4740 FEET OF 4 INCH POLY ALONG GRANDE AND ABANDON 2127 FEET OF
4 INCH CAST IRON, 1765 FEET OF 4 INCH, 402 FEET OF 3 INCH, 335 FEET OF 6 INCH
STEEL, 280 FEET OF 2 INCH POLY AND 20 FEET OF 4 INCH POLY IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1144 080.59360 7
RELOCATE FACILITIES. INSTALL 340 FEET OF 4 INCH POLY AND ABANDON 365
FEET OF 4 INCH POLY ALONG WALNUT CREEK DRIVE TO ACCOMMODATE CITY OF
MANSFIELD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD
RELOCATION OF
FACILITIES SEPTEMBER
1145 080.59365 42
INSTALL 2618 FEET OF 2 INCH POLY ALONG HARROLD AND ABANDON 252 FEET OF
2 INCH, 970 FEET OF 4 INCH STEEL, 310 FEET OF 2 INCH POLY AND 1839 FEET OF 2
INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HARROLD SYSTEM INTEGRITY SEPTEMBER
1146 080.59369 77
INSTALL 1450 FEET OF 4 INCH AND 315 FEET OF 2 INCH POLY ALONG ROSEDAL
AVENUE AND ABANDON 1925 FEET OF 4 INCH AND 130 FEET OF 6 INCH CAST IRON
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER
1147 080.59372 69
INSTALL 1277 FEET OF 2 INCH POLY AND 1539 FEET OF 4 INCH POLY ALONG
MARSHALL STREET AND ABANDON 1179 FEET OF 2 INCH STEEL AND 1557 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY SEPTEMBER
1148 080.59377 25
INSTALL 2515 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY ALONG BONHAM
STREET AND ABANDON 2110 FEET OF 3 INCH, 275 FEET OF 2 INCH STEEL, AND 650
FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY SEPTEMBER
1149 080.59378 65
RELOCATE FACILITIES. INSTALL 374 FEET OF 6 INCH STEEL ALONG BARRON ROAD
AND ABANDON 355 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF COLLEGE
STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
RELOCATION OF
FACILITIES SEPTEMBER
1150 080.59381 27
RELOCATE FACILITIES. INSTALL 556 FEET OF 2 INCH POLY ALONG BIDDISON AND
ABANDON 563 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1151 080.59387 5
INSTALL 360 FEET OF 2 INCH POLY ALONG LOMBARDY LANE AND ABANDON 51
FEET OF 1.25 INCH POLY AND 307 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1152 080.59402 48
RELOCATE FACILITIES. INSTALL 289 FEET OF 2 INCH POLY AND 690 FEET OF 4
INCH POLY AND 165 FEET OF 8 INCH POLY ALONG ABBOTT DRIVE AND ABANDON
605 FEET OF 3 INCH STEEL AND 343 FEET OF 4 INCH STEEL AND 130 FEET OF 8
INCH POLY TO ACCOMMODATE CITY OF WHITE SETTLEMENT STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT
RELOCATION OF
FACILITIES OCTOBER
1153 080.59408 31
RELOCATE FACILITIES. INSTALL 1030 FEET OF 2 INCH POLY ALONG GEORGE
STREET AND ABANDON 1025 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF
WHITE SETTLEMENT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT
RELOCATION OF
FACILITIES SEPTEMBER
1154 080.59409 45
RELOCATE FACILITIES. INSTALL 692 FEET OF 2 INCH POLY AND ABANDON 702
FEET OF 2 INCH STEEL ALONG GLENN DRIVE TO ACCOMMODATE CITY OF WHITE
SETTLEMENT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT
RELOCATION OF
FACILITIES SEPTEMBER
1155 080.59411 1
INSTALL 50 FEET OF 2 INCH POLY ALONG MCCRACKEN STREET AND ABANDON 673
FEET OF 3 INCH STEEL AND 8 FEET OF 3 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHICO SYSTEM INTEGRITY SEPTEMBER
1156 080.59414 52
INSTALL 30 FEET OF 3 INCH AND 1225 FEET OF 4 INCH POLY ALONG AVENUE Y AND
ABANDON 209 FEET OF 2 INCH, 889 FEET OF 3 INCH STEEL AND 10 FEET OF 3 INCH
POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY SEPTEMBER
1157 080.59416 83
INSTALL 444 FEET OF 2 INCH AND 3252 FEET OF 4 INCH POLY AND ABANDON 2280
FEET OF 2 INCH STEEL AND 356 FEET OF 2 INCH POLY AND 921 FEET OF 3 INCH
STEEL AND 25 FEET OF 4 INCH POLY ALONG MARVIN AVENUE IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY SEPTEMBER
1158 080.59427 61
INSTALL 2038 FEET OF 2 INCH POLY ALONG MAPLE AND ABANDON 2031 FEET OF 2
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
1159 080.59430 7
INSTALL (1) FLOWSIC METER AND ABANDON (1) FLOWSIC METER ALONG NORTH
SERVICE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY SEPTEMBER
1160 080.59432 86
INSTALL 1350 FEET OF 4 INCH, 1050 FEET OF 6 INCH AND 150 FEET OF 2 INCH POLY
ALONG RAY SIMON AND ABANDON 2151 FEET OF 4 INCH CAST IRON AND 516 FEET
OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1161 080.59445 41
RELOCATE FACILITIES. INSTALL 22 FEET OF 2 INCH AND 821 FEET OF 4 INCH POLY
ALONG FM1183 AND ABANDON 155 FEET OF 4 INCH AND 225 FEET OF 2 INCH POLY
TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
RELOCATION OF
FACILITIES SEPTEMBER
1162 080.59454 37
INSTALL 1550 FEET OF 2 INCH POLY ALONG BRIGHAM AND ABANDON 1220 FEET
OF 4 INCH AND 300 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1163 080.59463 46
INSTALL 903 FEET OF 2 INCH POLY AND 396 FEET OF 4 INCH POLY ALONG MALCOM
X BOULEVARD AND ABANDON 1296 FEET OF 4 INCH AND 442 FEET OF 8 INCH CAST
IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 36 of 178
255
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1164 080.59468 67
INSTALL 2606 FEET OF 4 INCH POLY ALONG DEVITT STREET AND ABANDON 1073
FEET OF 4 INCH CAST IRON AND 180 FEET OF 4 INCH POLY AND 1603 FEET OF 6
INCH STEEL AND 658 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1165 080.59469 87
INSTALL 1700 FEET OF 2 INCH POLY ALONG HICKORY AND ABANDON 1320 FEET OF
4 INCH CAST IRON AND 480 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1166 080.59470 277
INSTALL 2230 FEET OF 2 INCH POLY AND 320 FEET OF 4 INCH POLY ALONG
HICKORY STREET AND ABANDON 1375 FEET OF 4 INCH, 570 FEET OF 6 INCH CAST
IRON AND 295 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1167 080.59473 0
ABANDON DISTRICT REGULATOR STATION 05 IN ARCHER COUNTY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOLLIDAY SYSTEM INTEGRITY SEPTEMBER
1168 080.59477 10
INSTALL 680 FEET OF 2 INCH POLY ALONG DAVIS AND ABANDON 680 FEET OF 1.25
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER
1169 080.59482 8
INSTALL 440 FEET OF 2 INCH POLY ALONG STROUD AND ABANDON 139 FEET OF 2
INCH, 2 FEET OF 3 INCH POLY AND 304 FEET OF 3 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FROST SYSTEM INTEGRITY SEPTEMBER
1170 080.59488 7
RELOCATE FACILITIES. INSTALL 285 FEET OF 2 INCH POLY ALONG DONALEE
STREET AND ABANDON 290 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1171 080.59496 445
INSTALL 1350 FEET OF 4 INCH AND 625 FEET FO 6 INCH POLY ALONG MARYDALE
DRIVE AND ABANDON 1400 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1172 080.59497 23
RELOCATE FACILITIES. INSTALL 165 FEET OF 2 INCH AND 460 FEET OF 4 INCH
POLY ALONG BISHOP STREET AND ABANDON 221 FEET OF 3 INCH AND 411 FEET
OF 4 INCH STEEL TO ACCOMMODATE CITY OF CLIFTON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON
RELOCATION OF
FACILITIES SEPTEMBER
1173 080.59530 280
INSTALL 1700 FEET OF 2 INCH POLY ALONG TODD STREET AND ABANDON 782
FEET OF 4 INCH AND 956 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1174 080.59533 (353)
INSTALL 1490 FEET OF 2 INCH POLY AND ABANDON 1577 FEET OF 6 INCH AND 433
FEET OF 8 INCH CAST IRON ALONG KENILWORTH STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1175 080.59534 30
INSTALL 1205 FEET OF 2 INCH POLY AND ABANDON 490 FEET OF 4 INCH AND 974
FEET OF 6 INCH AND 328 FEET OF 8 INCH CAST IRON ALONG ALTON AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1176 080.59535 19
INSTALL 810 FEET OF 2 INCH POLY ALONG COLUMBIA AVENUE AND ABANDON 725
FEET OF 4 INCH AND 219 FEET OF 6 INCH AND 195 FEET OF 8 INCH CAST IRON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1177 080.59539 60
RELOCATE FACILITIES. INSTALL 1450 FEET OF 4 INCH POLY AND ABANDON 1500
FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1178 080.59541 65
RELOCATE FACILITIES. INSTALL 745 FEET OF 2 INCH AND 166 FEET OF 4 INCH
POLY AND ABANDON 718 FEET OF 2 INCH AND 155 FEET OF 3 INCH STEEL ALONG
SACHSE ROAD TO ACCOMMODATE CITY OF SACHSE STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SACHSE
RELOCATION OF
FACILITIES SEPTEMBER
1179 080.59546 108
INSTALL 350 FEET OF 10 INCH STEEL ALONG BROOKHOLLOW DRIVE AND
ABANDON 354 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
1180 080.59548 14
RELOCATE FACILITIES. INSTALL 524 FEET OF 2 INCH POLY AND ABANDON 277
FEET OF 2 INCH STEEL AND 220 FEET OF 2 INCH POLY ALONG GANTT STREET TO
ACCOMMODATE CITY OF PRINCETON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PRINCETON
RELOCATION OF
FACILITIES SEPTEMBER
1181 080.59553 62
INSTALL 1854 FEET OF 2 INCH POLY AND ABANDON 1635 FEET OF 3 INCH STEEL
ALONG LOVERS LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY OCTOBER
1182 080.59559 78
RELOCATE FACILITIES. INSTALL 6 FEET OF 2 INCH POLY AND 3093 FEET OF 4 INCH
POLY ALONG TRAILWOOD DRIVE AND ABANDON 6 FEET OF 2 INCH STEEL, 2 FEET
OF 2 INCH POLY, 2592 FEET OF 4 INCH STEEL AND 440 FEET OF 4 INCH POLY TO
ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
RELOCATION OF
FACILITIES SEPTEMBER
1183 080.59580 47
RELOCATE FACILITIES. INSTALL 1677 FEET OF 4 INCH POLY ALONG COYLE
STREET AND ABANDON 1572 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
ROWLETT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT
RELOCATION OF
FACILITIES OCTOBER
1184 080.59590 36
INSTALL 575 FEET OF 2 INCH POLY AND ABANDON 1030 FEET OF 2 INCH STEEL
ALONG 13TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BRIDGEPORT SYSTEM INTEGRITY SEPTEMBER
1185 080.59600 56
RELOCATE FACILITIES. INSTALL 1047 FEET OF 2 INCH POLY AND 139 FEET OF 4
INCH POLY ALONG UNIVERSITY AVENUE AND ABANDON 496 FEET OF 2 INCH
STEEL, 599 FEET OF 2 INCH POLY AND 155 FEET OF 4 INCH POLY TO
ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
RELOCATION OF
FACILITIES OCTOBER
1186 080.59601 169
INSTALL 1951 FEET OF 4 INCH POLY AND ABANDON 1939 FEET OF 4 INCH STEEL
ALONG ROYAL LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY OCTOBER
1187 080.59603 277
INSTALL 3358 FEET OF 4 INCH POLY ALONG HARRINGTON AND ABANDON 1335
FEET OF 4 INCH CAST IRON, 1142 FEET OF 4 INCH, 200 FEET OF 3 INCH, 100 FEET
OF 6 INCH STEEL, 404 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1188 080.59606 13
INSTALL 300 FEET OF 2 INCH POLY AND ABANDON 295 FEET OF 2 INCH STEEL
ALONG WEST BROADWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WEST SYSTEM INTEGRITY SEPTEMBER
1189 080.59611 28
INSTALL REGULATOR AND RELIEF VALVE AND ABANDON REGULATOR AND RELIEF
VALVE AT DISTRICT REGULATOR STATION 17 IN SOUTHLAKE IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE SYSTEM INTEGRITY SEPTEMBER
1190 080.59612 230
RELOCATE FACILITIES. INSTALL 3435 FEET OF 2 INCH POLY AND 780 FEET OF 4
INCH POLY AND 122 FEET OF 6 INCH POLY AND ABANDON 92 FEET OF 2 INCH
STEEL AND 304 FEET OF 3 INCH STEEL AND 1233 FEET OF 3 INCH POLY AND 822
FEET OF 4 INCH POLY AND 237 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
MANSFIELD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD
RELOCATION OF
FACILITIES OCTOBER
1191 080.59620 (154)
INSTALL 92 FEET OF 2 INCH POLY AND 510 FEET OF 4 INCH POLY AND 1823 FEET
OF 6 INCH POLY ALONG STREETS OF TIOGA AND ABANDON 77 FEET OF 2 INCH
STEEL AND 243 FEET OF 2 INCH POLY AND 692 FEET OF 3 INCH STEEL AND 208
FEET OF 3 INCH POLY AND 1267 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TIOGA SYSTEM INTEGRITY OCTOBER
1192 080.59625 326
INSTALL 187 FEET OF 2 INCH POLY AND 711 FEET OF 4 INCH POLY ALONG RETTA
STREET AND ABANDON 462 FEET OF 3 INCH POLY AND 1346 FEET OF 4 INCH POLY
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1193 080.59627 6,492
INSTALL 4975 FEET OF 4 INCH POLY ALONG DAVIS ROAD. DEVELOPER INSTALLED
FACILITIES. ALL CUSTOMERS MELISSA GROWTH JULY
1194 080.59637 285
INSTALL 788 FEET OF 2 INCH POLY AND 1398 FEET OF 4 INCH POLY ALONG
MANNETT STREET AND ABANDON 20 FEET OF 6 INCH POLY AND 1113 FEET OF 8
INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 37 of 178
256
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1195 080.59639 89
INSTALL 3300 FEET OF 4 INCH POLY ALONG STIRLING AND ABANDON 2194 FEET OF
4 INCH, 299 FEET OF 6 INCH CAST IRON AND 176 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1196 080.59640 614
INSTALL 2070 FEET OF 2 INCH POLY ALONG MANNETT STREET AND ABANDON 1310
FEET OF 4 INCH, 400 FEET OF 6 INCH AND 40 FEET OF 8 INCH CAST IRON AND 290
FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1197 080.59642 8
INSTALL 601 FEET OF 2 INCH POLY ALONG LYTLE STREET AND ABANDON 820 FEET
OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY SEPTEMBER
1198 080.59643 95
RELOCATE FACILITIES. INSTALL 1458 FEET OF 2 INCH POLY AND 703 FEET OF 4
INCH POLY ALONG LESLIE STREET AND ABANDON 2232 FEET OF 3 INCH STEEL
AND 42 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF HAMILTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS HAMILTON
RELOCATION OF
FACILITIES SEPTEMBER
1199 080.59644 38
RELOCATE FACILITIES. INSTALL 11 FEET OF 2 INCH AND 502 FEET OF 4 INCH POLY
ALONG HIGHWAY 281 AND ABANDON 2 FEET OF 2 INCH AND 491 FEET OF 4 INCH
STEEL TO ACCOMMODATE CITY OF HAMILTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HAMILTON
RELOCATION OF
FACILITIES SEPTEMBER
1200 080.59645 12
INSTALL 275 FEET OF 4 INCH POLY ALONG HICKORY STREET AND ABANDON 275
FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER
1201 080.59649 108,257
RELOCATE FACILITIES. INSTALL 1800 FEET OF 2 INCH AND 1200 FEET OF 8 INCH
POLY ALONG FM 2478 AND ABANDON 1380 FEET OF 2 INCH STEEL AND 175 FEET
OF 2 INCH AND 2180 FEET OF 8 INCH POLY TO ACCOMMODATE TXDOT STORM
DRAINAGE IMPROVEMENTS IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION
RULE 8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES OCTOBER
1202 080.59660 (249)
INSTALL 2336 FEET OF 2 INCH POLY ALONG BENNETT AVENUE AND ABANDON
2135 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1203 080.59666 68
RELOCATE FACILITIES. INSTALL 6 FEET OF 3 INCH POLY AND 1895 FEET OF 8 INCH
POLY ALONG HUBBARD STREET AND ABANDON 1758 FEET OF 3 INCH STEEL AND
102 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF HEATH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS HEATH
RELOCATION OF
FACILITIES OCTOBER
1204 080.59672 8
RELOCATE FACILITIES. INSTALL 401 FEET OF 2 INCH POLY ALONG 14TH STREET
AND ABANDON 393 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
RELOCATION OF
FACILITIES SEPTEMBER
1205 080.59675 52
INSTALL 20 FEET OF 6 INCH AND 35 FEET OF 12 INCH POLY AND ABANDON 462
FEET OF 6 INCH AND 23 FEET OF 12 INCH AND 12 FEET OF 16 INCH STEEL ALONG
RANIER ST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1206 080.59678 2,923
RELOCATE FACILITIES. INSTALL 105 FEET OF 2 INCH AND 50 FEET OF 4 INCH POLY
AND ABANDON 256 FEET OF 2 INCH STEEL ALONG THOMAS STREET TO
ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1207 080.59679 8
INSTALL 300 FEET OF 2 INCH AND 160 FEET OF 4 INCH POLY ALONG
BRECKENRIDGE ROAD AND ABANDON 300 FEET OF 2 INCH AND 160 FEET OF 4
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY SEPTEMBER
1208 080.59681 68
RELOCATE FACILITIES. INSTALL 115 FEET OF 2 INCH POLY AND 10 FEET OF 4 INCH
POLY ALONG THUNDERBIRD DRIVE AND ABANDON 115 FEET OF 2 INCH POLY AND
10 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1209 080.59683 7
RELOCATE FACILITIES. INSTALL (12) POLY SERVICES AND ABANDON (12) STEEL
SERVICES ALONG HETTIE STREET TO ACCOMMODATE CITY OF DENTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1210 080.59688 377
INSTALL 1558 FEET OF 2 INCH AND 1769 FEET OF 4 INCH POLY ALONG NORMA
STREET AND ABANDON 2000 FEET OF 4 INCH AND 1000 FEET OF 6 INCH CAST IRON
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1211 080.59691 20
INSTALL 535 FEET OF 4 INCH POLY ALONG OVERHILL ROAD AND ABANDON 140
FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1212 080.59697 32
RELOCATE FACILITIES. INSTALL 1275 FEET OF 4 INCH POLY ALONG BEDFORD
COURT AND ABANDON 1270 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
BEDFORD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEDFORD
RELOCATION OF
FACILITIES SEPTEMBER
1213 080.59700 35
RELOCATE FACILITIES. INSTALL (32) POLY SERVICES AND ABANDON (32) STEEL
SERVICES ALONG OVERTON PARK EAST TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1214 080.59702 232
INSTALL 210 FEET OF 2 INCH POLY AND 3161 FEET OF 4 INCH POLY ALONG
GOLDENROD AVENUE AND ABANDON 1910 FEET OF 4 INCH AND 840 FEET OF 6
INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1215 080.59705 7
RELOCATE FACILITIES. INSTALL 406 FEET OF 4 INCH POLY ALONG MAIN STREET
AND ABANDON 108 FEET OF 2 INCH POLY AND 227 FEET OF 3 INCH STEEL TO
ACCOMMODATE CITY OF WOLFE CITY STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WOLFE CITY
RELOCATION OF
FACILITIES SEPTEMBER
1216 080.59713 4
INSTALL (4) REGULATORS AND ABANDON (4) REGULATORS AT INTERNATIONAL
GRAIN ALONG CITY OF GREENVILLE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY SEPTEMBER
1217 080.59724 515
INSTALL 2030 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK 2A.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
1218 080.59726 77
INSTALL 54 FEET OF 2 INCH AND 1263 FEET OF 8 INCH POLY ALONG 7TH STREET
AND ABANDON 38 FEET OF 2 INCH, 1199 FEET OF 6 INCH STEEL, AND 3 FEET OF 2
INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER
1219 080.59728 11
RELOCATE FACILITIES. INSTALL 346 FEET OF 6 INCH POLY AND ABANDON 332
FEET OF 6 INCH POLY ALONG SH360 TO ACCOMMODATE CITY OF ARLINGTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES SEPTEMBER
1220 080.59729 69
INSTALL 15 FEET OF 2 INCH AND 1535 FEET OF 6 INCH POLY ALONG MINTCLAIR
AND ABANDON 1460 FEET OF 6 INCH AND 15 FEET OF 4 INCH CAST IRON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1221 080.59733 7
RELOCATE FACILITIES. INSTALL 215 FEET OF 2 INCH POLY ALONG RICE STREET
AND ABANDON 200 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF BEVERLY
HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEVERLY HILLS
RELOCATION OF
FACILITIES SEPTEMBER
1222 080.59738 40
INSTALL 36 FEET OF 2 INCH AND 2544 FEET OF 4 INCH POLY ALONG OLD BURK
ROAD AND ABANDON MLR05 AND MLR22 AND 15 FEET OF 2 INCH, 50 FEET OF 3
INCH, 15 FEET OF 4 INCH, 320 FEET OF 6 INCH STEEL AND 81 FEET OF 4 INCH POLY
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
1223 080.59741 58
INSTALL 1106 FEET OF 2 INCH AND 812 FEET OF 4 INCH POLY AND ABANDON 419
FEET OF 6 INCH AND 691 FEET OF 8 INCH CAST IRON ALONG GREENWAY
BOLUVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 38 of 178
257
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1224 080.59745 309
INSTALL 800 FEET OF 2 INCH AND 1567 FEET OF 4 INCH POLY AND ABANDON 2160
FEET OF 6 INCH CAST IRON ALONG AVALON AVENUE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1225 080.59746 5,945
INSTALL 2145 FEET OF 4 INCH POLY ALONG GASTON AVENUE AND ABANDON 530
FEET OF 6 INCH AND 2305 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1226 080.59747 669
INSTALL 1750 FEET OF 4 INCH POLY ALONG INWOOD ROAD AND ABANDON 1775
FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1227 080.59753 84
INSTALL 271 FEET OF 2 INCH AND 1724 FEET OF 4 INCH POLY AND ABANDON 98
FEET OF 2 INCH AND 1376 FEET OF 4 INCH STEEL AND 167 FEET OF 4 INCH AND
172 FEET OF 6 INCH POLY AND 695 FEET OF 6 INCH CAST IRON ALONG ASTER
AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1228 080.59775 322
INSTALL 1972 FEET OF 4 INCH POLY AND ABANDON 1318 FEET OF 4 INCH STEEL
AND 812 FEET OF 6 INCH, 536 FEET OF 4 INCH POLY AND 746 FEET OF 6 INCH CAST
IRON ALONG DAISY LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1229 080.59784 263
INSTALL (2) 8 INCH MOONEY REGULATORS AND ABANDON (2) 6 INCH GROVE
REGULATORS ALONG GARLAND DISTRICT REGULATOR 60 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
1230 080.59818 4
RELOCATE FACILITIES. INSTALL 150 FEET OF 1.25 INCH POLY ALONG WOODBINE
ROAD AND ABANDON 150 FEET OF 1.25 INCH POLY TO ACCOMMODATE CITY OF
FLOWER MOUND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
RELOCATION OF
FACILITIES SEPTEMBER
1231 080.59823 17
INSTALL (25) REGULATORS AND ABANDON (25) REGULATORS IN DALLAS COUNTY
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1232 080.59824 45
INSTALL 1280 FEET OF 2 INCH AND 590 FEET OF 4 INCH POLY AND ABANDON 1550
FEET OF 4 INCH CAST IRON ALONG CHRISTENSEN DRIVE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1233 080.59825 56
INSTALL 1635 FEET OF 2 INCH AND 355 FEET OF 4 INCH POLY AND ABANDON 1630
FEET OF 4 INCH AND 345 FEET OF 6 INCH CAST IRON ALONG LATTA STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1234 080.59827 89
INSTALL 29 FEET OF 2 INCH AND 17 FEET OF 4 INCH AND 2237 FEET OF 6 INCH
AND 3 FEET OF 8 INCH POLY AND ABANDON 60 FEET OF 4 INCH AND 1130 FEET OF
8 INCH CAST IRON ALONG WINSTED IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1235 080.59830 273
INSTALL 1555 FEET OF 2 INCH POLY AND 422 FEET OF 4 INCH POLY AND 1069 FEET
OF 6 INCH POLY AND ABANDON 450 FEET OF 8 INCH, 840 FEET OF 4 INCH CAST
IRON AND 1000 FEET OF 4 INCH POLY ALONG DELROSE DRIVE IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1236 080.59836 7
INSTALL 400 FEET OF 4 INCH POLY ALONG TEXAS STREET AND ABANDON 380 FEET
OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CALVERT SYSTEM INTEGRITY SEPTEMBER
1237 080.59845 92
INSTALL 1251 FEET OF 2 INCH POLY AND 2143 FEET OF 4 INCH POLY AND
ABANDON 1969 FEET OF 4 INCH, 1266 FEET OF 6 INCH CAST IRON, 994 FEET OF 6
INCH AND 538 FEET OF 4 INCH STEEL ALONG RIVERSIDE DRIVE IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1238 080.59854 66
RELOCATE FACILITIES. INSTALL 814 FEET OF 2 INCH POLY AND 1106 FEET OF 4
INCH POLY AND ABANDON 2000 FEET OF 4 INCH CAST IRON ALONG MARIGOLD
AVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1239 080.59857 1
INSTALL GROUND BED ALONG LINE L8C AND ABANDON GROUND BED IN BRAZOS
COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY SEPTEMBER
1240 080.59879 236
INSTALL 1833 FEET OF 2 INCH POLY AND 148 FEET OF 4 INCH POLY AND ABANDON
1070 FEET OF 8 INCH CAST IRON AND 1030 FEET OF 8 INCH POLY ALONG EAST
MOCKINGBIRD ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1241 080.59881 25
RELOCATE FACILITIES. INSTALL 1290 FEET OF 2 INCH POLY ALONG ROUSE STREET
AND ABANDON 980 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1242 080.59882 116
RELOCATE FACILITIES. INSTALL 720 FEET OF 2 INCH POLY AND 4 FEET OF 3 INCH
POLY AND 2650 FEET OF 4 INCH POLY AND ABANDON 234 FEET OF 3 INCH POLY
AND 1884 FEET OF 4 INCH POLY ALONG FREEPORT ROAD TO ACCOMMODATE
CITY OF COPPELL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COPPELL
RELOCATION OF
FACILITIES SEPTEMBER
1243 080.59886 3,756
RELOCATE FACILITIES. INSTALL 2 FEET OF 4 INCH POLY AND 850 FEET OF 6 INCH
POLY AND 1970 FEET OF 8 INCH POLY AND ABANDON 2188 FEET OF 2 INCH STEEL
AND 518 FEET OF 2 INCH POLY ALONG COLLINS ROAD TO ACCOMMODATE CITY
OF SUNNYVALE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SUNNYVALE
RELOCATION OF
FACILITIES OCTOBER
1244 080.59889 2,208
INSTALL 90,561 FEET OF 2 INCH, 27,748 FEET OF 4 INCH, 6,954 FEET OF 6 INCH AND
3 FEET OF 8 INCH POLY ALONG FONTANA, ESPANOLA, DURANGO, CORTEZ, AND
LARGO STREETS AND ABANDON 27,293 FEET OF 2 INCH, 61,861 FEET OF 3 INCH,
19,081 FEET OF 4 INCH AND 15,296 FEET OF 6 INCH STEEL $$$$ IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1245 080.59893 351
RELOCATE FACILITIES. INSTALL 385 FEET OF 2 INCH POLY AND 5 FEET OF 3 INCH
POLY AND 5232 FEET OF 4 INCH POLY ALONG KIMBO ROAD AND ABANDON 432
FEET OF 2 INCH STEEL AND 48 FEET OF 2 INCH POLY AND 3561 FEET OF 3 INCH
STEEL AND 55 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1246 080.59894 10
RELOCATE FACILITIES. INSTALL 270 FEET OF 2 INCH POLY ALONG WILLOW
STREET AND ABANDON 266 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
BURNET STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURNET
RELOCATION OF
FACILITIES SEPTEMBER
1247 080.59905 699
RELOCATE FACILITIES. INSTALL 184 FEET OF 2 INCH POLY AND 658 FEET OF 8
INCH POLY AND ABANDON 115 FEET OF 2 INCH POLY AND 147 FEET OF 6 INCH
STEEL AND 301 FEET OF 8 INCH STEEL AND 101 FEET OF 8 INCH POLY AND 96
FEET OF 10 INCH STEEL ALONG EAGLE DRIVE TO ACCOMMODATE CITY OF
DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1248 080.59907 44
INSTALL 1480 FEET OF 2 INCH POLY ALONG COLGATE AND ABANDON 1460 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY SEPTEMBER
1249 080.59909 21
RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY ALONG SUGAR CANE
LANE AND ABANDON 316 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF
DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
1250 080.59912 13
RELOCATE FACILITIES. INSTALL 406 FEET OF 4 INCH POLY ALONG DUCK CREEK
ROAD AND ABANDON 407 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF
SANGER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER
RELOCATION OF
FACILITIES SEPTEMBER
1251 080.59939 (481)
RELOCATE FACILITIES. INSTALL 72 FEET OF 2 INCH POLY AND 3468 FEET OF 4
INCH POLY AND ABANDON 1069 FEET OF 2 INCH STEEL AND 30 FEET OF 2 INCH
POLY AND 2060 FEET OF 4 INCH STEEL AND 330 FEET OF 4 INCH POLY TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1252 080.59943 81,427
INSTALL 30,000 FEET OF 6 INCH STEEL AND 5000 FEET OF 8 INCH POLY ALONG
LINE L15 AND ABANDON 32,000 FEET OF 6 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 39 of 178
258
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1253 080.59946 141
RELOCATE FACILITIES. INSTALL 2075 FEET OF 2 INCH POLY AND 2200 FEET OF 4
INCH POLY AND ABANDON 6 FEET OF 2 INCH POLY AND 17 FEET OF 3 INCH POLY
AND 3817 FEET OF 4 INCH POLY ALONG MAYHILL ROAD TO ACCOMMODATE CITY
OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES SEPTEMBER
1254 080.59947 107
RELOCATE FACILITIES. INSTALL 2425 FEET OF 2 INCH POLY ALONG HAWTHORNE
STREET , AND ABANDON 775 FEET OF 3 INCH STEEL, 1125 FEET OF 2 INCH STEEL
AND 525 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF IRVING STREET
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
1255 080.59948 104
INSTALL 2204 FEET OF 2 INCH AND 1223 FEET OF 4 INCH POLY ALONG SNOW
WHITE DRIVE AND ABANDON 1490 FEET OF 2 INCH, 700 FEET OF 3 INCH AND 1213
FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1256 080.59956 9
INSTALL 5 FEET OF 3 INCH POLY AND 371 FEET OF 4 INCH POLY AND ABANDON
370 FEET OF 3 INCH POLY ALONG BELT LINE ROAD IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COPPELL SYSTEM INTEGRITY SEPTEMBER
1257 080.59970 15
INSTALL 380 FEET OF 4 INCH POLY ALONG 39TH AND ABANDON 380 FEET OF 4
INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
1258 080.59971 598
INSTALL 4977 FEET OF 2 INCH POLY AND 1347 FEET OF 4 INCH POLY AND
ABANDON 4801 FEET OF 3 INCH STEEL ALONG SHADY HILL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1259 080.59994 6
INSTALL 450 FEET OF 2 INCH POLY ALONG NORTH BRECKENRIDGE AND ABANDON
450 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY SEPTEMBER
1260 080.60006 3
RELOCATE FACILITIES. INSTALL 234 FEET OF 4 INCH POLY ALONG FM709 AND
ABANDON 209 FEET OF 3 INCH AND 34 FEET OF 4 INCH POLY TO ACCOMMODATE
CITY OF RETREAT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RETREAT
RELOCATION OF
FACILITIES SEPTEMBER
1261 080.60022 21
INSTALL 600 FEET OF 2 INCH POLY AND ABANDON 600 FEET OF 2 INCH STEEL
ALONG WALDROP ALLEY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1262 080.60047 193
INSTALL 3520 FEET OF 2 INCH AND 1475 FEET OF 4 INCH POLY ALONG MELISSA
LANE AND ABANDON 5103 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1263 080.60048 168
INSTALL 1605 FEET OF 2 INCH POLY ALONG NORTHVIEW LANE AND ABANDON 1520
FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1264 080.60050 248
INSTALL 4720 FEET OF 2 INCH AND 1420 FEET OF 4 INCH POLY ALONG PORT
ROYAL DRIVE AND ABANDON 4720 FEET OF 2 INCH AND 1420 FEET OF 3 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1265 080.60063 64
INSTALL 2325 FEET OF 4 INCH POLY ALONG PARMER AND ABANDON 632 FEET OF 4
INCH AND 1938 FEET OF 2 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1266 080.60077 46
RELOCATE FACILITIES. INSTALL 1442 FEET OF 2 INCH POLY AND ABANDON 1394
FEET OF 2 INCH STEEL AND 5 FEET OF 2 INCH POLY ALONG CALIFORNIA LANE TO
ACCOMMODATE CITY OF DALWORTHINGTON GARDENS STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS
DALWORTHINGTON
GARDENS
RELOCATION OF
FACILITIES SEPTEMBER
1267 080.60079 60
RELOCATE FACILITIES. INSTALL 15 FEET OF 3 INCH AND 673 FEET OF 6 INCH AND
597 FEET OF 8 INCH POLY AND ABANDON 22 FEET OF 3 INCH AND 683 FEET OF 6
INCH AND 585 FEET OF 8 INCH STEEL AND 6 FEET OF 6 INCH AND 10 FEET OF 8
INCH POLY ALONG 36TH STREET TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1268 080.60080 446,156 INSTALL 2 MILES OF 12 INCH STEEL ALONG MEADOW RUN. ALL CUSTOMERS MELISSA
SYSTEM
IMPROVEMENT MARCH
1269 080.60083 1
INSTALL RECTIFIER AND POLE AND ABANDON RECTIFIER AND POLE ALONG
GILMER RD IN LONGVIEW IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY SEPTEMBER
1270 080.60087 69
INSTALL 1350 FEET OF 4 INCH POLY AND ABANDON 1350 FEET OF 3 INCH STEEL
ALONG MELETIO LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1271 080.60088 8
RELOCATE FACILITIES. INSTALL 140 FEET OF 4 INCH AND 224 FEET OF 6 INCH
POLY ALONG STERILITE DRIVE AND ABANDON 178 FEET OF 4 INCH AND 182 FEET
OF 6 INCH POLY TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
RELOCATION OF
FACILITIES SEPTEMBER
1272 080.60091 122
INSTALL 1431 FEET OF 4 INCH POLY ALONG WEBB AVENUE AND ABANDON 170
FEET OF 2 INCH, 800 FEET OF 3 INCH STEEL AND 247 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE SYSTEM INTEGRITY OCTOBER
1273 080.60094 810
INSTALL 8428 FEET OF 2 INCH POLY AND 2 FEET OF 3 INCH POLY AND ABANDON
5502 FEET OF 2 INCH STEEL, 1761 FEET OF 2 INCH POLY, 229 FEET OF 3 INCH
STEEL, 97 FEET OF 3 INCH POLY AND 350 FEET OF 4 INCH STEEL ALONG WEST
34TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
1274 080.60100 172
RELOCATE FACILITIES. INSTALL 279 FEET OF 2 INCH POLY AND 5 FEET OF 3 INCH
POLY AND 2631 FEET OF 4 INCH POLY AND 1240 FEET OF 6 INCH POLY MARIE
STREET AND ABANDON 651 FEET OF 2 INCH STEEL AND 68 FEET OF 2 INCH POLY
AND 3821 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF SAN ANGELO
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.. ALL CUSTOMERS SAN ANGELO
RELOCATION OF
FACILITIES SEPTEMBER
1275 080.60103 304
INSTALL 1407 FEET OF 2 INCH POLY AND 6 FEET OF 3 INCH POLY AND 1428 FEET
OF 4 INCH POLY ALONG CLOUD CIRCLE AND ABANDON 958 FEET OF 2 INCH STEEL
AND 1022 FEET OF 3 INCH STEEL AND 1773 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1276 080.60104 258
INSTALL 2457 FEET OF 2 INCH POLY AND ABANDON 2020 FEET OF 2 INCH AND 520
FEET OF 3 INCH STEEL ALONG CROXIA DRIVE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1277 080.60105 3,580
INSTALL 2745 FEET OF 2 INCH AND 350 FEET OF 8 INCH POLY AND ABANDON 2745
FEET OF 3 INCH STEEL AND 350 FEET OF 8 INCH STEEL ALONG FLAIR DRIVE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1278 080.60106 132
INSTALL 32 FEET OF 4 INCH POLY AND 1931 FEET OF 6 INCH POLY ALONG
WALDORF AND ABANDON 17 FEET OF 4 INCH STEEL AND 1876 FEET OF 8 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1279 080.60107 102
INSTALL 1622 FEET OF 2 INCH AND 1670 FEET OF 4 INCH POLY AND ABANDON
3629 FEET OF 3 INCH STEEL ALONG WEBB CHAPEL ROAD IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1280 080.60108 204
INSTALL 8530 FEET OF 2 INCH POLY, 2480 FEET OF 4 INCH POLY, AND 2340 FEET
OF 6 INCH POLY ALONG WALNUT HILL LANE. ABANDON 675 FEET OF 2 INCH STEEL,
8120 FEET OF 3 INCH STEEL, 1935 FEET OF 4 INCH STEEL, 1960 FEET OF 6 INCH
STEEL, AND 355 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1281 080.60110 169
INSTALL 3449 FEET OF 2 INCH POLY AND 14 FEET OF 4 INCH POLY ALONG KILLION
STREET AND ABANDON 887 FEET OF 2 INCH STEEL AND 47 FEET OF 2 INCH POLY
AND 2154 FEET OF 3 INCH STEEL AND 11 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1282 080.60111 32,453
INSTALL 5910 FEET OF 2 INCH, 195 FEET OF 4 INCH, 3070 FEET OF 6 INCH POLY
ALONG WELCH ROAD AND ABANDON 7760 FEET OF 3 INCH, 190 FEET OF 4 INCH
STEEL, 440 FEET OF 3 INCH AND 590 FEET OF 2 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1283 080.60112 (2,405)
INSTALL 5964 FEET OF 2 INCH AND 1188 FEET OF 12 INCH POLY AND ABANDON
5710 FEET OF 2 INCH AND 20 FEET OF 3 INCH STEEL ALONG MIDWAY ROAD IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 40 of 178
259
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1284 080.60113 8,952
INSTALL 28,030 FEET OF 2 INCH, 7,805 FEET OF 4 INCH, 6,065 FEET OF 6 INCH, 170
FEET OF 8 INCH, AND 6010 FEET OF 12 INCH POLY ALONG WALNUT HILL AND
ABANDON 5045 FEET OF 2 INCH, 12085 FEET OF 3 INCH, 10,310 FEET OF 4 INCH,
7,925 FEET OF 6 INCH, 495 FEET OF 8 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1285 080.60114 16,598
INSTALL 3205 FEET OF 2 INCH, 3160 FEET OF 4 INCH AND 1900 FEET OF 6 INCH
POLY ALONG THE STREETS OF THE LAKES AT LEGACY. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL PROSPER GROWTH SEPTEMBER
1286 080.60117 82
INSTALL 450 FEET OF 2 INCH POLY AND ABANDON 345 FEET OF 4 INCH CAST IRON
ALONG SUMMITT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1287 080.60125 85
INSTALL DISTRICT REGULATOR STATION ALONG HACKBERRY STREET AND
ABANDON DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON SYSTEM INTEGRITY OCTOBER
1288 080.60126 266
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION 05 ALONG WEST 15TH STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS CLIFTON SYSTEM INTEGRITY OCTOBER
1289 080.60142 24
INSTALL 940 FEET OF 2 INCH POLY ALONG REVERE AND ABANDON 930 FEET OF 3
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY SEPTEMBER
1290 080.60143 31
INSTALL 770 FEET OF 2 INCH POLY ALONG MISTLETOE DRIVE AND ABANDON 5
FEET OF 2 INCH STEEL AND 674 FEET OF 3 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY SEPTEMBER
1291 080.60145 46,645
INSTALL DISTRICT REGULATOR STATION IN EVERMAN AND ABANDON DISTRICT
REGULATOR STATION DRS2541 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN SYSTEM INTEGRITY OCTOBER
1292 080.60146 97
RELOCATE FACILITIES. INSTALL 2575 FEET OF 2 INCH POLY ALONG OSCEOLE
AVENUE AND 384 FEET OF 4 INCH POLY AND ABANDON 2210 FEET OF 2 INCH
STEEL AND 32 FEET OF 2 INCH POLY AND 354 FEET OF 4 INCH STEEL TO
ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.2009. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES SEPTEMBER
1293 080.60150 23
RELOCATE FACILITIES. INSTALL 477 FEET OF 2 INCH POLY ALONG EVA STREET
AND ABANDON 467 FEET OF 2 INCH STEEL AND 10 FEET OF 2 INCH POLY TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1294 080.60157 24
RELOCATE FACILITIES. INSTALL 1350 FEET OF 4 INCH AND 800 FEET OF 2 INCH
POLY ALONG GLENDALE STREET AND ABANDON 1350 FEET OF 4 INCH AND 700
FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF KILGORE STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS KILGORE
RELOCATION OF
FACILITIES SEPTEMBER
1295 080.60158 41
INSTALL 1260 FEET OF 2 INCH AND 162 FEET OF 4 INCH POLY ALONG PINE AVENUE
AND ABANDON 1088 FEET OF 2 INCH, 108 FEET OF 3 INCH STEEL, 165 FEET OF 2
INCH AND 96 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER
1296 080.60163 44
INSTALL 650 FEET OF 8 INCH POLY AND ABANDON 650 FEET OF 8 INCH STEEL
POLY ALONG LOMBARDY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1297 080.60167 104
RELOCATE FACILITIES. INSTALL 3000 FEET OF 2 INCH AND 310 FEET OF 4 INCH
POLY AND ABANDON 3000 FEET OF 2 INCH AND 45 FEET OF 3 INCH AND 380 FEET
OF 4 INCH STEEL AND 15 FEET OF 4 INCH POLY ALONG FALCON DRIVE TO
ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
RELOCATION OF
FACILITIES OCTOBER
1298 080.60170 15
INSTALL 590 FEET OF 2 INCH POLY ALONG LYNCH STREET AND ABANDON 1170
FEET OF 2 INCH STEEL AND 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE SYSTEM INTEGRITY SEPTEMBER
1299 080.60171 58
RELOCATE FACILITIES. INSTALL 57 FEET OF 2 INCH AND 1833 FEET OF 4 INCH
POLY AND ABANDON 47 FEET OF 2 INCH AND 771 FEET OF 3 INCH POLY AND 990
FEET OF 4 INCH STEEL ALONG GRADY STREET TO ACCOMMODATE CITY OF
FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
RELOCATION OF
FACILITIES OCTOBER
1300 080.60172 53
RELOCATE FACILITIES. INSTALL 2000 FEET OF 2 INCH POLY AND ABANDON 1400
FEET OF 2 INCH STEEL AND 550 FEET OF 2 INCH POLY ALONG TRUETT STREET TO
ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
RELOCATION OF
FACILITIES SEPTEMBER
1301 080.60173 27
RELOCATE FACILITIES. INSTALL 540 FEET OF 2 INCH AND 50 FEET OF 4 INCH POLY
AND ABANDON 1064 FEET OF 2 INCH AND 80 FEET OF 4 INCH STEEL AND 1500
FEET OF 2 INCH POLY ALONG FALMOUTH DRIVE TO ACCOMMODATE CITY OF
FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
RELOCATION OF
FACILITIES SEPTEMBER
1302 080.60178 6
INSTALL 4 FEET OF 3 INCH AND 94 FEET OF 4 INCH POLY ALONG WOODS AND
ABANDON 68 FEET OF 2 INCH, 66 FEET OF 3 INCH STEEL AND 24 FEET OF 3 INCH
POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER
1303 080.60182 460
INSTALL REGULATOR AND ABANDON REGULATOR ON DISTRICT REGULATOR
STATION 8 ON LINE J2 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
1304 080.60188 24
INSTALL 270 FEET OF 4 INCH AND 50 FEET OF 2 INCH POLY ALONG NORTH 38TH
STREET AND ABANDON 50 FEET OF 4 INCH POLY, 204 FEET OF 4 INCH AND 43 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER
1305 080.60191 31
RELOCATE FACILITIES. INSTALL 212 FEET OF 2 INCH, 590 FEET OF 4 INCH, AND 150
FEET OF 6 INCH POLY ALONG GRANT STREET AND ABANDON 209 FEET OF 2 INCH,
266 FEET OF 4 INCH AND 145 FEET OF 6 INCH POLY AND 325 FEET OF 4 INCH
STEEL TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
RELOCATION OF
FACILITIES SEPTEMBER
1306 080.60200 493
INSTALL 884 FEET OF 2 INCH AND 113 FEET OF 4 INCH AND 219 FEET OF 6 INCH
AND 4810 FEET OF 8 INCH POLY AND ABANDON 857 FEET OF 3 INCH AND 113 FEET
OF 4 INCH AND 30 FEET OF 6 INCH AND 4786 FEET OF 8 INCH STEEL ALONG THE
STREETS OF WALNUT HILL LANE IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1307 080.60201 272
INSTALL 52 FEET OF 2 INCH AND 3182 FEET OF 4 INCH POLY AND ABANDON 850
FEET OF 3 INCH AND 2510 FEET OF 6 INCH STEEL ALONG LAKEMONT DRIVE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1308 080.60202 378
INSTALL 2110 FEET OF 6 INCH AND 7480 FEET OF 2 INCH POLY ALONG WEBB
CHAPEL ROAD AND ABANDON 310 FEET OF 2 INCH, 3405 FEET OF 3 INCH AND 2753
FEET OF 6 INCH STEEL, 75 FEET OF 6 INCH AND 50 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1309 080.60204 253
INSTALL 1073 FEET OF 2 INCH AND 2830 FEET OF 8 INCH POLY AND ABANDON 975
FEET OF 2 INCH AND 1598 FEET OF 6 INCH AND 2830 FEET OF 8 INCH STEEL
ALONG THE STREETS OF WEBB CHAPEL ROAD IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1310 080.60217 8
RELOCATE FACILITIES. INSTALL 257 FEET OF 6 INCH POLY AND ABANDON 245
FEET OF 6 INCH POLY ALONG MAGNOLIA RIDGE DRIVE TO ACCOMMODATE CITY
OF MELISSA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA
RELOCATION OF
FACILITIES SEPTEMBER
1311 080.60225 50
INSTALL 120 FEET OF8 INCH POLY AND ABANDON 147 FEET OF 8 INCH STEEL
ALONG SOUTH HAMPTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1312 080.60248 34
INSTALL 2 FEET OF 16 INCH STEEL AND ABANDON 2 FEET OF 16 INCH STEEL
ALONG WEST DAVIS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 41 of 178
260
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1313 080.60250 74
RELOCATE FACILITIES. INSTALL 16 FEET OF 2 INCH AND 2417 FEET OF 6 INCH
POLY AND ABANDON 2100 FEET OF 6 INCH POLY ALONG ASHMORE LANE TO
ACCOMMODATE CITY OF NORTHLAKE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTHLAKE
RELOCATION OF
FACILITIES OCTOBER
1314 080.60254 175
RELOCATE FACILITIES. INSTALL 3667 FEET OF 2 INCH AND 1429 FEET OF 4 INCH
POLY AND ABANDON 1672 FEET OF 2 INCH, 67 FEET OF 3 INCH AND 1463 FEET OF
4 INCH STEEL AND 1711 FEET OF 2 INCH AND 40 FEET OF 4 INCH POLY ALONG
BAYLOR STREET TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
RELOCATION OF
FACILITIES OCTOBER
1315 080.60259 31
INSTALL 110 FEET OF 12 INCH POLY AND 100 FEET OF 6 INCH POLY AND ABANDON
80 FEET OF 6 INCH STEEL AND 6 FEET OF 12 INCH POLY AND 38 FEET OF 16 INCH
STEEL ALONG CHALK HILL ROAD IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1316 080.60279 11
RELOCATE FACILITIES. INSTALL 236 FEET OF 2 INCH POLY AND 123 FEET OF 4
INCH POLY ALONG HUNTING DRIVE AND ABANDON 25 FEET OF 2 INCH STEEL AND
160 FEET OF 4 INCH STEEL AND 123 FEET OF 4 INCH POLY TO ACCOMMODATE
CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1317 080.60285 74
RELOCATE FACILITIES. INSTALL 1950 FEET OF 4 INCH POLY AND ABANDON 328
FEET OF 2 INCH AND 1875 FEET OF 3 INCH AND 8 FEET OF 4 INCH POLY ALONG
INDIAN CREEK DRIVE TO ACCOMMODATE CITY OF TROPHY CLUB STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS TROPHY CLUB
RELOCATION OF
FACILITIES OCTOBER
1318 080.60287 76
RELOCATE FACILITIES. INSTALL 4588 FEET OF 2 INCH POLY AND ABANDON 4676
FEET OF 2 INCH STEEL ALONG GLENBROOK TO ACCOMMODATE CITY OF GARLAND
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
1319 080.60288 15
INSTALL 8 FEET OF 4 INCH AND 33 FEET OF 8 INCH POLY ALONG WESTMORELAND
ROAD AND ABANDON 12 FEET OF 4 INCH AND 17 FEET OF 8 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1320 080.60294 67
INSTALL 871 FEET OF 12 INCH POLY ALONG 25TH STREET AND ABANDON 854 FEET
OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
1321 080.60295 34
INSTALL 7 FEET OF 12 INCH STEEL ALONG LINE P7 AND ABANDON 9 FEET OF 12
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY SEPTEMBER
1322 080.60299 39
INSTALL 7 FEET OF 8 INCH STEEL ALONG LINE L(2ND) AND ABANDON 7 FEET OF 8
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY SEPTEMBER
1323 080.60302 2
INSTALL 3 INCH FLOWSAFE RELIEF VALVES AT DISTRICT REGULATOR STATION 12
AND ABANDON 2 INCH FISHER RELIEF VALVE IN TRAVIS COUNTY IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WELLS BRANCH SYSTEM INTEGRITY SEPTEMBER
1324 080.60317 8,256
INSTALL 5008 FEET OF 4 INCH POLY ALONG STREETS OF CROSSROADS AT
TERRELL. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL TERRELL GROWTH JULY
1325 080.60328 18
INSTALL 25 FEET OF 12 INCH POLY AND ABANDON 25 FEET OF 12 INCH STEEL
ALONG SINGLETON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1326 080.60337 12,925
RELOCATE FACILITIES. INSTALL 1052 FEET OF 8 INCH POLY AND ABANDON 824
FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF WESTWORTH VILLAGE
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
RELOCATION OF
FACILITIES OCTOBER
1327 080.60345 14
INSTALL 45 FEET OF 8 INCH POLY AND ABANDON 20 FEET OF 10 INCH STEEL
ALONG MCKINNEY AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1328 080.60359 (19)
INSTALL 1000 FEET OF 6 INCH POLY MAIN AND ABANDON 450 FEET OF 4 INCH
STEEL ALONG PRESTON STREET IN ACCORDANCE WITH RAILROAD COMMISSON
OF TEXAS RULE 8.209. ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY OCTOBER
1329 080.60361 732
INSTALL 346 POLY SERVICES AND ABANDON 346 STEEL SERVICES ALONG THE
STREETS OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1330 080.60364 42
INSTALL 444 FEET OF 2 INCH AND 331 FEET OF 8 INCH POLY ALONG FOREST
ABENUE AND ABANDON 400 FEET OF 2 INCH AND 332 FEET OF 8 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1331 080.60379 2
INSTALL RELIEF VALVE AT DISTRICT REGULATOR STATION 14 IN GARLAND AND
ABANDON RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
1332 080.60381 32
RELOCATE FACILITIES. INSTALL 1254 FEET OF 2 INCH POLY ALONG CHEROKEE
TRAIL AND ABANDON 1232 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1333 080.60382 2
INSTALL RELIEF VALVE AT DISTRICT REGULATOR STATION 5 IN MESQUITE AND
ABANDON RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY SEPTEMBER
1334 080.60383 3
INSTALL RELIEF VALVE AT KAUFMAN DISTRICT REGULATORS STATION 06 AND
ABANDON RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN SYSTEM INTEGRITY SEPTEMBER
1335 080.60390 3,493
RELOCATE FACILITIES. INSTALL 240 FEET OF 2 INCH AND 55 FEET OF 4 INCH POLY
ALONG AVENUE A AND ABANDON 504 FEET OF 2 INCH POLY TO ACCOMMODATE
CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1336 080.60391 2,085
RELOCATE FACILITIES. INSTALL 60 FEET OF 2 INCH POLY AND 50 FEET OF 4 INCH
POLY ALONG AVENUE H AND ABANDON 110 FEET OF 2 INCH POLY TO
ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1337 080.60396 142
RELOCATE FACILITIES. INSTALL 108 FEET OF 24 INCH STEEL ALONG SCYENE
ROAD AND ABANDON 100 FEET OF 24 INCH STEEL TO ACCOMMODATE CITY OF
MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
RELOCATION OF
FACILITIES OCTOBER
1338 080.60397 81
INSTALL 2986 FEET OF 4 INCH POLY ALONG MARTIN LYDON AVENUE AND
ABANDON 1375 FEET OF 3 INCH AND 60 FEET OF 4 INCH AND 17 FEET OF 6 INCH
POLY AND 1529 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1339 080.60399 737
RELOCATE FACILITIES. INSTALL 5357 FEET OF 2 INCH AND 482 FEET OF 4 INCH
POLY ALONG NAVARRO AVENUE AND ABANDON 2219 FEET OF 2 INCH, 475 FEET
OF 1.25 INCH, 263 FEET OF 2 INCH STEEL, 1504 FEET OF 2 INCH, AND 457 FEET OF
1.25 INCH POLY TO ACCOMMODATE CITY OF DE LEON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DE LEON
RELOCATION OF
FACILITIES OCTOBER
1340 080.60402 1
RELOCATE FACILITIES. INSTALL 51 FEET OF 2 INCH POLY AND ABANDON 55 FEET
OF 2 INCH STEEL ALONG 3RD STREET TO ACCOMMODATE CITY OF LAMPASAS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS LAMPASAS
RELOCATION OF
FACILITIES SEPTEMBER
1341 080.60413 41
RELOCATE FACILITIES. INSTALL 712 FEET OF 6 INCH POLY AND ABANDON 720
FEET OF 6 INCH POLY ALONG MILITARY PARKWAY TO ACCOMMODATE CITY OF
MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
RELOCATION OF
FACILITIES SEPTEMBER
1342 080.60419 378
RELOCATE FACILITIES. INSTALL 1358 FEET OF 2 INCH POLY AND 58 FEET OF 4
INCH POLY ALONG SMOKEY MOUNTAIN DRIVE AND ABANDON 1154 FEET OF 2
INCH STEEL AND 204 FEET OF 2 INCH AND 58 FEET OF 4 INCH POLY TO
ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 42 of 178
261
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1343 080.60430 11
RELOCATE FACILITIES. INSTALL 338 FEET OF 2 INCH POLY AND ABANDON 338
FEET OF 2 INCH POLY ALONG DAVIS BOULVARD TO ACCOMMODATE CITY OF
NORTH RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTH RICHLAND HILLS
RELOCATION OF
FACILITIES SEPTEMBER
1344 080.60439 87
INSTALL 804 FEET OF 2 INCH POLY AND 1193 FEET OF 6 INCH POLY AND ABANDON
279 FEET OF 2 INCH POLY AND 2168 FEET OF 4 INCH CAST IRON AND 1208 FEET OF
6 INCH STEEL AND 1180 FEET OF 8 INCH CAST IRON ALONG SPRING AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1345 080.60441 70
INSTALL 1640 FEET OF 4 INCH AND 810 FEET OF 2 INCH POLY ALONG MARSHALL
AND ABANDON 55 FEET OF 4 INCH POLY, 95 FEET OF 6 INCH STEEL AND 2300 FEET
OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1346 080.60442 24
RELOCATE FACILITIES. INSTALL 251 FEET OF 6 INCH POLY AND ABANDON 25
FEET OF 4 INCH STEEL AND 70 FEET OF 6 INCH POLY ALONG LAFAYETTE AVENUE
TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1347 080.60446 618
RELOCATE FACILITIES. INSTALL 1585 FEET OF 2 INCH POLY ALONG ATON STREET
AND ABANDON 615 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF
WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
RELOCATION OF
FACILITIES OCTOBER
1348 080.60447 1,409,734
INSTALL 2,000 FEET OF 6 INCH, 40 FEET OF 4 INCH, AND 40 FEET OF 2 INCH POLY
AND DISTRICT REGULATOR STATION #04 ALONG STATE HIGHWAY 114 AND
ABANDON 250 FEET OF 6 INCH, 1,200 FEET OF 4 INCH POLY AND 550 FEET OF 4
INCH STEEL AND DISTRICT REGULATOR STATION #04. ALL CUSTOMERS SOUTHLAKE
SYSTEM
IMPROVEMENT DECEMBER
1349 080.60449 94
INSTALL 1526 FEET OF 2 INCH, 539 FEET OF 4 INCH AND 875 FEET OF 6 INCH POLY
ALONG SPRING AVENUE AND ABANDON 305 FEET OF 2 INCH STEEL AND 26 FEET
OF 6 INCH AND 4 FEET OF 2 INCH POLY AND 1898 FEET OF 4 INCH AND 745 FEET
OF 6 INCH AND 632 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1350 080.60452 67
INSTALL 1560 FEET OF 2 INCH AND 774 FEET OF 4 INCH POLY ALONG FRANK
STREET AND ABANDON 1022 FEET OF 4 INCH POLY AND 1005 FEET OF 4 INCH AND
273 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1351 080.60454 16
INSTALL 497 FEET OF 2 INCH POLY AND ABANDON 687 FEET OF 2 INCH STEEL
AND 103 FEET OF 2 INCH POLY ALONG JONES STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY SEPTEMBER
1352 080.60455 97
INSTALL 2100 FEET OF 2 INCH AND 298 FEET OF 4 INCH POLY ALONG LAGOW
STREET AND ABANDON 880 FEET OF 4 INCH AND 1654 FEET OF 6 INCH CAST IRON
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1353 080.60473 49
INSTALL 10 INCH MAINLINE VALVE AND (2) 4 INCH STRADDLE VALVES AT DFW
NORTH REMOTE PARKING AND ABANDON 10 INCH MAINLINE VALVE AND (2) 4 INCH
MAINLINE VALVES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY SEPTEMBER
1354 080.60474 13
INSTALL 803 FEET OF 4 INCH POLY ALONG JUNIUS STREET AND ABANDON 698
FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY SEPTEMBER
1355 080.60478 755
INSTALL 427 FEET OF 2 INCH POLY AND ABANDON 410 FEET OF 1.25 INCH STEEL
ALONG NORTHWEST HIGHWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1356 080.60486 83
INSTALL 2612 FEET OF 4 INCH POLY AND ABANDON 1611 FEET OF 4 INCH, 600
FEET OF 6 INCH CAST IRON, 477 FEET OF 4 INCH STEEL AND 543 FEET OF 4 INCH
POLY ALONG GROVER AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1357 080.60495 19
INSTALL 510 FEET OF 2 INCH POLY ALONG ALGERITA STREET AND ABANDON 454
FEET OF 3 INCH STEEL AND 124 FEET OF 3 INCH POLY AND 80 FEET OF 6 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY SEPTEMBER
1358 080.60497 77,145
INSTALL 1,150 FEET OF 6 INCH AND 95 FEET OF 4 INCH POLY ALONG DALLAS
PARKWAY AND JOHN HICKMAN IN FRISCO. ALL CUSTOMERS FRISCO GROWTH SEPTEMBER
1359 080.60507 126
INSTALL 100 FEET OF 2 INCH POLY AND 1410 FEET OF 4 INCH POLY AND
ABANDON805 FEET OF 4 INCH POLY, 422 FEET OF 4 INCH CAST IRON AND 27 FEET
OF 4 INCH STEEL ALONG GORDON AVENUE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1360 080.60516 32
RELOCATE FACILITIES. INSTALL 978 FEET OF 2 INCH POLY AND 1088 FEET OF 4
INCH POLY AND ABANDON 572 FEET OF 2 INCH STEEL AND 927 FEET OF 2 INCH
POLY AND 342 FEET OF 4 INCH POLY ALONG OATES ROAD TO ACCOMMODATE
CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
1361 080.60517 76
INSTALL DISTRICT REGULATOR STATION AND METER AT JAGOE-PUBLIC CO
ASPHALT PLANT AND ABANDON DISTRICT REGULATOR STATION AND METER IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER
1362 080.60518 21
RELOCATE FACILITIES. INSTALL 910 FEET OF 4 INCH POLY ALONG WHITLEY ROAD
AND ABANDON 930 FEET OF 4 INCH STEEL AND 8 FEET OF 4 INCH POLY TO
ACCOMMODATE CITY OF KELLER STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER
RELOCATION OF
FACILITIES SEPTEMBER
1363 080.60542 5
INSTALL 3 FEET OF 2 INCH POLY AND 275 FEET OF 4 INCH POLY ALONG TRADERS
ROAD AND ABANDON 15 FEET OF 2 INCH POLY AND 350 FEET OF 4 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY SEPTEMBER
1364 080.60546 1,565
RELOCATE FACILITIES. INSTALL 626 FEET OF 2 INCH POLY AND 19 FEET OF 4 INCH
POLY AND ABANDON 581 FEET OF 2 INCH STEEL AND 15 FEET OF 4 INCH STEEL
ALONG PECAN STREET TO ACCOMMODATE CITY OF FRISCO STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
RELOCATION OF
FACILITIES OCTOBER
1365 080.60547 2
RELOCATE FACILITIES. INSTALL 55 FEET OF 2 INCH POLY ALONG HIGHWAY 79 AND
ABANDON 58 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF OAKWOOD
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS OAKWOOD
RELOCATION OF
FACILITIES SEPTEMBER
1366 080.60548 375
INSTALL 1232 FEET OF 2 INCH POLY ALONG CLINTON AND ABANDON 1277 FEET OF
2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY OCTOBER
1367 080.60559 67
RELOCATE FACILITIES. INSTALL 2257 FEET OF 2 INCH POLY AND ABANDON 65
FEET OF 2 INCH STEEL AND 1286 FEET OF 2 INCH POLY ALONG WABASH AVENUE
TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1368 080.60560 34
RELOCATE FACILITIES. INSTALL 291 FEET OF 6 INCH POLY ALONG SH198 AND
ABANDON 215 FEET OF 4 INCH AND 25 FEET OF 6 INCH STEEL AND 3 FEET OF 4
INCH AND 20 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF CANTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CANTON
RELOCATION OF
FACILITIES OCTOBER
1369 080.60561 27
RELOCATE FACILITIES. INSTALL 520 FEET OF 2 INCH POLY AND ABANDON 510
FEET OF 2 INCH STEEL AND 5 FEET OF 2 INCH POLY ALONG ELLIS AVENUE TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1370 080.60572 3
RELOCATE FACILITIES. INSTALL 265 FEET OF 2 INCH POLY AND ABANDON 403
FEET OF 2 INCH STEEL ALONG ENNIS AVENUE TO ACCOMMODATE CITY OF ENNIS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
RELOCATION OF
FACILITIES SEPTEMBER
MTX Additions
Page 43 of 178
262
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1371 080.60580 643
RELOCATE FACILITIES. INSTALL 600 FEET OF 10 INCH STEEL ALONG TXDOT
FRONTAGE ROAD AND ABANDON 1100 FEET OF 10 INCH STEEL TO ACCOMMODATE
CITY OF ARLINGTON TXDOT STREET PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
1372 080.60584 123
INSTALL 551 FEET OF 2 INCH POLY AND 4 FEET OF 3 INCH POLY AND ABANDON
100 FEET OF 3 INCH STEEL AND 570 FEET OF 4 INCH STEEL AND 40 FEET OF 4 INCH
POLY ALONG CHESTNUT STREET IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY OCTOBER
1373 080.60585 110
INSTALL 1920 FEET OF 4 INCH POLY AND ABANDON 1920 FEET OF 6 INCH CAST
IRON ALONG THE STREETS OF CHEROKEE TRAIL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1374 080.60586 4,227
INSTALL 2040 FEET OF 4 INCH POLY AND ABANDON 1950 FEET OF 6 INCH CAST
IRON ALONG BLUE BONNET ROAD IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1375 080.60596 271
INSTALL 291 POLY SERVICES AND ABANDON 291 STEEL SERVICES ALONG THE
STREETS OF ARLINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
1376 080.60598 98
INSTALL (164) POLY SERVICES ALONG STREETS OF WAXAHACHIE AND ABANDON
(164) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY SEPTEMBER
1377 080.60599 112
INSTALL (80) POLY SERVICES ALONG STREETS OF FREDERICKSBURG AND
ABANDON (80) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG SYSTEM INTEGRITY SEPTEMBER
1378 080.60604 15
INSTALL 455 FEET OF 2 INCH POLY ALONG PURNELL ROAD AND ABANDON 284
FEET OF 2 INCH AND 140 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY SEPTEMBER
1379 080.60608 17
RELOCATE FACILITIES. INSTALL 1060 FEET OF 4 INCH POLY AND ABANDON 812
FEET OF 2 INCH AND 347 FEET OF 3 INCH STEEL AND 45 FEET OF 2 INCH POLY
ALONG THE STREETS OF ROCKHILL ROAD TO ACCOMMODATE CITY OF MCKINNEY
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES SEPTEMBER
1380 080.60611 137
RELOCATE FACILITIES. INSTALL 1240 FEET OF 4 INCH POLY ALONG PERKINS
STREET AND ABANDON 537 FEET OF 2 INCH STEEL AND 1542 FEET OF 4 INCH
CAST IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1381 080.60615 4,492
RELOCATE FACILITIES. INSTALL 760 FEET OF 2 INCH AND 2100 FEET OF 4 INCH
POLY ALONG GARDNER DRIVE AND ABANDON 1900 FEET OF 3 INCH STEEL TO
ACCOMMODATE TXDOT HIGHWAY WIDENING PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE
RELOCATION OF
FACILITIES OCTOBER
1382 080.60616 41
INSTALL 910 FEET OF 6 INCH POLY ALONG 24TH STREET AND ABANDON 10 FEET
OF 6 INCH STEEL AND 910 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY SEPTEMBER
1383 080.60619 36
RELOCATE FACILITIES. INSTALL 1414 FEET OF 2 INCH POLY ALONG AND ABANDON
302 FEET OF 2 INCH STEEL AND 1067 FEET OF 4 INCH STEEL TO ACCOMMODATE
CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
1384 080.60628 141
RELOCATE FACILITIES. INSTALL 188 FEET OF 4 INCH POLY ALONG ROGSBEE
DRIVE AND ABANDON 188 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES OCTOBER
1385 080.60629 9
INSTALL 875 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY ALONG COMMERCE
STREET AND ABANDON 1275 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1386 080.60634 18
RELOCATE FACILITIES. INSTALL 460 FEET OF 6 INCH POLY ALONG STREETS OF
GRANDPRAIRIE AND ABANDON 440 FEET OF 6 INCH STEEL TO ACCOMMODATE
CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES SEPTEMBER
1387 080.60636 30
RELOCATE FACILITIES. INSTALL 33 FEET OF 4 INCH AND 458 FEET OF 8 INCH POLY
ALONG BRIAR HILL ROAD AND ABANDON 28 FEET OF 3 INCH, 6 FEET OF 4 INCH,
AND 430 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF GRAND PRAIRIE
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES SEPTEMBER
1388 080.60644 2
INSTALL FLOWSAFE RELIEF VALVE AT DISTRICT REGULATOR STATION 2 AND
ABANDON ROCKWELL RELIEF VALVE IN WILLIAMSON COUNTY IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY SEPTEMBER
1389 080.60646 17
INSTALL 831 FEET OF 2 INCH POLY ALONG GARLINGTON AND ABANDON 970 FEET
OF 2 INCH, 32 FEET OF 3 INCH STEEL AND 38 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE SYSTEM INTEGRITY SEPTEMBER
1390 080.60655 942
INSTALL 2723 FEET OF 2 INCH POLY AND ABANDON 2422 FEET OF 3 INCH STEEL
ALONG BEAVER BROOK LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1391 080.60661 275
RELOCATE FACILITIES. INSTALL 1700 FEET OF 2 INCH AND 125 FEET OF 4 INCH
POLY ALONG BRANCHVIEW DRIVE ABANDON 2570 FEET OF 2 INCH STEEL AND 320
FEET OF 2 INCH POLY AND 500 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF
ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
1392 080.60662 4,820
RELOCATE FACILITIES. INSTALL 459 FEET OF 2 INCH POLY AND 4 FEET OF 3 INCH
POLY AND 1780 FEET OF 4 INCH POLY AND ABANDON 180 FEET OF 2 INCH STEEL
AND 95 FEET OF 2 INCH POLY AND 28 FEET OF 3 INCH POLY AND 1050 FEET OF 4
INCH POLY ALONG E.SANFORD TO ACCOMMODATE CITY OF ARLINGTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
1393 080.60663 16
RELOCATE FACILITIES. INSTALL 260 FEET OF 4 INCH POLY ALONG PACIFIC STREET
AND ABANDON 260 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORNEY
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORNEY
RELOCATION OF
FACILITIES SEPTEMBER
1394 080.60664 50
INSTALL 3158 FEET OF 2 INCH POLY AND ABANDON 435 FEET OF 4 INCH POLY AND
2725 FEET OF 6 INCH CAST IRON ALONG THE STREETS OF PENELOPE STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1395 080.60670 823,888
INSTALL 40 FEET OF 8 INCH STEEL AND 2459 FEET OF 8 INCH POLY AND 34 FEET
OF 12 INCH STEEL AND 3918 FEET OF 16 INCH STEEL AND ABANDON 5 FEET OF 4
INCH POLY AND 2723 FEET OF 18 INCH STEEL ALONG PIPELINE ROAD IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY OCTOBER
1396 080.60679 61
RELOCATE FACILITIES. INSTALL 1126 FEET OF 4 INCH POLY AND ABANDON 2885
FEET OF 4 INCH STEEL AND 20 FEET OF 6 INCH POLY ALONG THE STREETS OF
BISHOP STREET TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1397 080.60681 36
RELOCATE FACILITIES. INSTALL 840 FEET OF 2 INCH POLY ALONG GAMBRELL AND
ABANDON 878 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1398 080.60683 73
RELOCATE FACILITIES. INSTALL 1385 FEET OF 4 INCH POLY AND 10 FEET OF 6
INCH POLY AND ABANDON 1002 FEET OF 4 INCH STEEL AND 90 FEET OF 4 INCH
POLY ALONG THE STREETS OF ROSEDALE TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1399 080.60684 37
RELOCATE FACILITIES. INSTALL 3000 FEET OF 6 INCH POLY ALONG SHAHAN
PRAIRIE AND ABANDON 3000 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
LITTLE ELM STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LITTLE ELM
RELOCATION OF
FACILITIES OCTOBER
1400 080.60685 15
INSTALL 950 FEET OF 2 INCH POLY ALONG NORTH ONEAL STREET AND ABANDON
1110 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CALDWELL SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 44 of 178
263
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1401 080.60688 40
INSTALL 1527 FEET OF 2 INCH AND 529 FEET OF 4 INCH POLY ALONG CANAL
STREET AND ABANDON 1440 FEET OF 4 INCH CAST IRON AND 100 FEET OF 4 INCH
POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1402 080.60691 18,623
RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH AND 800 FEET OF 6 INCH
POLY ALONG MILLER AND ABANDON 440 FEET OF 2 INCH AND 770 FEET OF 6 INCH
STEEL TO ACCOMMODATE THE CITY OF GARLAND IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
1403 080.60693 8,087
RELOCATE FACILITIES. INSTALL 27 FEET OF 4 INCH POLY AND 4503 FEET OF 6
INCH POLY AND ABANDON 122 FEET OF 2 INCH POLY AND 3963 FEET OF 6 INCH
POLY ALONG FM2181 TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1404 080.60694 1,233
RELOCATE FACILITIES. INSTALL 2268 FEET OF 4 INCH POLY ALONG CLAIREMONT
AVENUE AND ABANDON 758 FEET OF 4 INCH, 894 FEET OF 6 INCH CAST IRON AND
1145 FEET OF 4 INCH AND 64 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1405 080.60699 8
INSTALL 354 FEET OF 2 INCH POLY ALONG SOUTH MARKET STREET AND
ABANDON 354 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY SEPTEMBER
1406 080.60704 72
INSTALL 233 FEET OF 2 INCH AND 2320 FEET OF 4 INCH POLY AND ABANDON 1974
FEET OF 4 INCH CAST IRON, 814 FEET OF 4 INCH AND 557 FEET OF 6 INCH POLY
ALONG LIVINGSTON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1407 080.60705 51
INSTALL 1841 FEET OF 4 INCH AND 5 FEET OF 6 INCH POLY ALONG LIVINGSTON
AVENUE AND ABANDON 1828 FEET OF 4 INCH CAST IRON AND 3 FEET OF 4 INCH
AND 20 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1408 080.60706 880
INSTALL 2665 FEET OF 4 INCH POLY ALONG STANDIFER STREET AND ABANDON
1794 FEET OF 4 INCH STEEL, 658 FEET OF 4 INCH CAST IRON AND 640 FEET OF 4
INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1409 080.60707 122
INSTALL 220 FEET OF 2 INCH AND 3 FEET OF 3 INCH AND 3463 FEET OF 4 INCH
POLY AND ABANDON 224 FEET OF 2 INCH AND 1339 FEET OF 6 INCH CAST IRON
AND 2712 FEET OF 4 INCH STEEL AND 384 FEET OF 4 INCH POLY ALONG 22ND
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1410 080.60714 98
INSTALL 150 FEET OF 4 INCH AND 450 FEET OF 8 INCH POLY AND ABANDON 10
FEET OF 3 INCH AND 50 FEET OF 4 INCH AND 1003 FEET OF 8 INCH STEEL ALONG
ROGERS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1411 080.60718 124
INSTALL 1544 FEET OF 2 INCH POLY AND ABANDON 110 FEET OF 3 INCH AND 297
FEET OF 4 INCH AND 1398 FEET OF 6 CAST IRON ALONG THE STREETS OF
HARWOOD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1412 080.60719 447
INSTALL 2085 FEET OF 2 INCH AND 279 FEET OF 4 INCH POLY AND ABANDON 1550
FEET OF 4 INCH AND 647 FEET OF 6 INCH CAST IRON ALONG ROBERT L PARRISH
AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1413 080.60720 123
INSTALL 1237 FEET OF 2 INCH POLY AND 271 FEET OF 4 INCH POLY AND ABANDON
1508 FEET OF 6 INCH CAST IRON ALONG WOFFORD AVENUE IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1414 080.60721 101
INSTALL 1307 FEET OF 2 INCH POLY AND ABANDON 8 FEET OF 2 INCH AND 871
FEET OF 6 INCH AND 352 FEET OF 8 INCH CAST IRON ALONG ELSIE FAYE HEGGINS
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1415 080.60722 127
INSTALL 1135 FEET OF 2 INCH POLY AND ABANDON 1131 FEET OF 6 INCH CAST
IRON ALONG EVERGREEN HILLS IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1416 080.60723 25
INSTALL 910 FEET OF 2 INCH AND 160 FEET OF 4 INCH POLY AND ABANDON 555
FEET OF 2 INCH STEEL AND 790 FEET OF 4 INCH CAST IRON ALONG COLLINS
AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1417 080.60724 270
INSTALL 1514 FEET OF 2 INCH AND 527 FEET OF 4 INCH POLY AND ABANDON 1951
FEET OF 6 INCH CAST IRON ALONG YORK STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1418 080.60725 63
INSTALL 1519 FEET OF 2 INCH AND 449 FEET OF 4 INCH POLY AND ABANDON 173
FEET OF 3 INCH POLY AND 1320 FEET OF 4 INCH AND 272 FEET OF 8 INCH CAST
IRON ALONG THE STREETS OF OAKDALE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1419 080.60727 341
INSTALL 1200 FEET OF 2 INCH AND 8 FEET OF 4 INCH POLY AND ABANDON 1194
FEET OF 8 INCH CAST IRON ALONG LATTA STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1420 080.60728 297
INSTALL 2530 FEET OF 2 INCH POLY ALONG FOREST HILLS AND ABANDON 1850
FEET OF 8 INCH AND 255 FEET OF 6 INCH CAST IRON AND 180 FEET OF 8 INCH AND
245 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1421 080.60729 312
INSTALL 1248 FEET OF 2 INCH POLY AND ABANDON 630 FEET OF 6 INCH AND 910
FEET OF 8 INCH CAST IRON AND 462 FEET OF 8 INCH POLY ALONG MARBURG
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1422 080.60730 50
INSTALL 925 FEET OF 2 INCH POLY AND ABANDON 447 FEET OF 4 INCH POLY AND
1110 FEET OF 6 INCH CAST IRON ALONG STOREY STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1423 080.60732 3,175
INSTALL 1250 FEET OF 2 INCH AND 420 FEET OF 4 INCH POLY ALONG WODDORD
AVENUE AND ABANDON 1375 FEET OF 4 INCH AND 425 FEET OF 6 ICH CAST IRON
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1424 080.60733 30
INSTALL 967 FEET OF 2 INCH POLY AND 670 FEET OF 4 INCH POLY AND ABANDON
596 FEET OF 6 INCH CAST IRON ALONG CARTER STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1425 080.60734 141
INSTALL 672 FEET OF 2 INCH POLY AND 1279 FEET OF 4 INCH POLY AND ABANDON
69 FEET OF 3 INCH AND 2350 FEET OF 4 INCH CAST IRON AND 402 FEET OF 4 INCH
POLY ALONG THE STREETS OF PARK IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1426 080.60735 435
INSTALL 1994 FEET OF 2 INCH POLY ALONG COLUMBIA AVENUE AND ABANDON
1030 FEET OF 4 INCH CAST IRON AND 1030 FEET OF 4 INCH POLY IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1427 080.60736 7,289
INSTALL 1785 FEET OF 2 INCH AND 640 FEET OF 4 INCH POLY ALONG LAGOW AND
ABANDON 1655 FEET OF 4 INCH, 265 FEET OF 6 INCH CAST IRON, AND 460 FEET OF
2 INCH AND 370 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1428 080.60737 191
INSTALL 1350 FEET OF 2 INCH POLY ALONG TURNER AVENUE AND ABANDON 250
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1429 080.60738 26
INSTALL 1190 FEET OF 2 INCH POLY ALONG CHRISTENSEN DRIVE AND ABANDON
1190 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1430 080.60740 57
INSTALL 1390 FEET OF 2 INCH POLY ALONG ROLINDA DRIVE AND ABANDON 1860
FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 45 of 178
264
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1431 080.60741 56
RELOCATE FACILITIES. INSTALL 1836 FEET OF 2 INCH AND 670 FEET OF 4 INCH
POLY AND ABANDON 615 FEET OF 2 INCH STEEL AND 1074 FEET OF 4 INCH STEEL
AND 599 FEET OF 2 INCH POLY AND 349 FEET OF 4 INCH POLY ALONG AVENUE L
TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
RELOCATION OF
FACILITIES OCTOBER
1432 080.60743 253
INSTALL 1460 FEET OF 2 INCH POLY AND ABANDON 1280 FEET OF CAST IRON
ALONG MYRTLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1433 080.60744 63
INSTALL 2396 FEET OF 2 INCH POLY AND ABANDON 50 FEET OF 4 INCH POLY AND
12 FEET OF 6 INCH POLY AND 2610 FEET OF 6 INCH CAST IRON ALONG JAMAICA
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1434 080.60745 46
INSTALL 1525 FEET OF 2 INCH POLY ALONG FROEMAN STREET AND ABANDON
1365 FEET OF 4 INCH AND 90 FEET OF 8 INCH CAST IRON AND 340 FEET OF 4 INCH
POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1435 080.60747 1,341
INSTALL 2040 FEET OF 4 INCH POLY ALONG AVALON AVENUE AND ABANDON 180
FEET OF 4 INCH AND 1860 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1436 080.60750 29
RELOCATE FACILITIES. INSTALL 480 FEET OF 6 INCH POLY ALONG WESTERN
CENTER BOULEVARD AND ABANDON 480 FEET OF 6 INCH POLY TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1437 080.60754 119,453
INSTALL 200 FEET OF 6 INCH POLY AND 419 FEET OF 16 INCH STEEL AND
ABANDON 480 FEET OF 16 INCH STEEL ALONG BAKER BLVD AND CRITES IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS SYSTEM INTEGRITY OCTOBER
1438 080.60760 25
RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH POLY AND ABANDON 730
FEET OF 2 INCH STEEL AND 70 FEET OF 2 INCH POLY ALONG LAVISTA STREET TO
ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
RELOCATION OF
FACILITIES OCTOBER
1439 080.60763 309
INSTALL 1835 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK
PHASE 5. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
1440 080.60769 49,684
RELOCATE FACILITIES. INSTALL 7132 FEET OF 2 INCH POLY AND 8 FEET OF 3 INCH
POLY AND 1373 FEET OF 4 INCH POLY AND 7491 FEET OF 6 INCH POLY AND
ABANDON 332 FEET OF 2 INCH POLY AND 6132 FEET OF 4 INCH STEEL AND 2612
FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF TERRELL STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS TERRELL
RELOCATION OF
FACILITIES OCTOBER
1441 080.60770 4
RELOCATE FACILITIES. INSTALL 527 FEET OF 2 INCH POLY ALONG PINE STREET
AND ABANDON 408 FEET OF 2 INCH AND 128 FEET OF 3 INCH STEEL AND 80 FEET
OF 3 INCH POLY TO ACCOMMODATE CITY OF HILLSBORO STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO
RELOCATION OF
FACILITIES OCTOBER
1442 080.60781 27
INSTALL 1380 FEET OF 2 INCH POLY AND ABANDON 1360 FEET OF 4 INCH STEEL
AND 10 FEET OF 4 INCH POLY ALONG BARRETT STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER
1443 080.60797 1,031
INSTALL 1925 FEET OF 2 INCH POLY ALONG STONEBRIDGE AND ABANDON 325
FEET OF 2 INCH, 645 FEET OF 4 INCH, 1010 FEET OF 6 INCH AND 280 FEET OF 8
INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1444 080.60806 30
RELOCATE FACILITIES. INSTALL 6 FEET OF 4 INCH POLY AND 1405 FEET OF 6 INCH
POLY ALONG TURBEVILLE AND ABANDON 787 FEET OF 4 INCH POLY AND 692 FEET
OF 6 INCH POLY TO ACCOMMODATE CITY OF HICKORY CREEK STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS HICKORY CREEK
RELOCATION OF
FACILITIES OCTOBER
1445 080.60808 15,282
RELOCATE FACILITIES. INSTALL 860 FEET OF 2 INCH POLY AND ABANDON 686
FEET OF 2 INCH POLY ALONG COIT ROAD TO ACCOMMODATE CITY OF PLANO
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES OCTOBER
1446 080.60809 40
RELOCATE FACILITIES. INSTALL 1077 FEET OF 2 INCH POLY ALONG BINGHAM
STREET AND ABANDON 1013 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
STEPHENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
RELOCATION OF
FACILITIES SEPTEMBER
1447 080.60817 5
RELOCATE FACILITIES. INSTALL 46 FEET OF 6 INCH POLY ALONG LAKE FOREST
AND ABANDON 54 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF WOODWAY
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WOODWAY
RELOCATION OF
FACILITIES SEPTEMBER
1448 080.60822 45
RELOCATE FACILITIES. INSTALL 840 FEET OF 2 INCH POLY ALONG NORTH TRAIL
AND ABANDON 795 FEET OF 2 INCH STEEL AND 9 FEET OF 4 INCH POLY TO
ACCOMMODATE CITY OF CROWLEY STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY
RELOCATION OF
FACILITIES SEPTEMBER
1449 080.60823 170
RELOCATE FACILITIES. INSTALL 1010 FEET OF 12 INCH POLY AND ABANDON 918
FEET OF 12 INCH POLY ALONG TRINITY FALLS PARKWAY TO ACCOMMODATE CITY
OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES OCTOBER
1450 080.60826 114
RELOCATE FACILITIES. INSTALL 2700 FEET OF 2 INCH POLY AND ABANDON 2000
FEET OF 2 INCH STEEL ALONG ARAPAHO ROAD TO ACCOMMODATE CITY OF
RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
RELOCATION OF
FACILITIES SEPTEMBER
1451 080.60844 16
RELOCATE FACILITIES. INSTALL 550 FEET OF 2 INCH POLY ALONG THANNISCH
AVENUE AND ABANDON 482 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES SEPTEMBER
1452 080.60847 38
INSTALL 880 FEET OF 4 INCH POLY AND ABANDON 842 FEET OF 4 INCH STEEL
AND 32 FEET OF 4 INCH POLY ALONG BAILEY STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER
1453 080.60852 41
INSTALL 487 FEET OF 4 INCH POLY AND ABANDON 476 FEET OF 6 INCH STEEL
ALONG BILL OWENS PARKWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER
1454 080.60857 70
RELOCATE FACILITIES. INSTALL 1135 FEET OF 4 INCH POLY AND ABANDON 22
FEET OF 2 INCH STEEL AND 63 FEET OF 2 INCH POLY AND 108 FEET OF 3 INCH
STEEL AND 1068 FEET OF 4 INCH STEEL AND 315 FEET OF 4 INCH POLY ALONG
HANDLEY DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1455 080.60859 46
RELOCATE FACILITIES. INSTALL 1030 FEET OF 8 INCH POLY AND ABANDON 1148
FEET OF 4 INCH STEEL ALONG GRAYSON STREET TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1456 080.60865 49
RELOCATE FACILITIES. INSTALL 1052 FEET OF 2 INCH POLY AND ABANDON 278
FEET OF 2 INCH STEEL AND 685 FEET OF 2 INCH POLY ALONG ROGERS AVENUE
TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1457 080.60866 29
RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH AND 1748 FEET OF 4 INCH
POLY ALONG FRANCIS STREET AND ABANDON 253 FEET OF 2 INCH STEEL AND
1465 FEET OF 4 INCH STEEL AND 362 FEET OF 3 INCH POLY TO ACCOMMODATE
CITY OF COLLEGE STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
RELOCATION OF
FACILITIES SEPTEMBER
MTX Additions
Page 46 of 178
265
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1458 080.60868 119
RELOCATE FACILITIES. INSTALL 549 FEET OF 2 INCH POLY AND 1743 FEET OF 4
INCH POLY AND ABANDON 549 FEET OF 2 INCH STEEL AND 12 FEET OF 2 INCH
POLY ALONG ANDREW AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1459 080.60871 105
INSTALL 1055 FEET OF 2 INCH POLY AND 75 FEET OF 4 INCH POLY AND 1525 FEET
OF 6 INCH POLY AND ABANDON 220 FEET OF 2 INCH STEEL AND 130 FEET OF 2
INCH POLY AND 126 FEET OF 3 INCH STEEL AND 384 FEET OF 4 INCH STEEL AND
1017 FEET OF 6 INCH STEEL AND 788 FEET OF 8 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER
1460 080.60872 38
RELOCATE FACILITIES. INSTALL 251 FEET OF 2 INCH AND 693 FEET OF 4 INCH
POLY ALONG KINSALE COURT AND ABANDON 212 FEET OF 2 INCH AND 480 FEET
OF 3 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1461 080.60878 2,088
INSTALL 1500 FEET OF 4 INCH AND 390 FEET OF 2 INCH POLY ALONG PARKLAND
AVENUE AND ABANDON 1500 FEET OF 4 INCH AND 390 FEET OF 6 INCH CAST IRON
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1462 080.60879 3
INSTALL DISTRICT REGULATOR STATION ALONG INTERSTATE 35 AND ABANDON
DISTRICT REGULATOR STATION IN ELLIS COUNTY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY SEPTEMBER
1463 080.60886 488,225
INSTALL 2,500 FEET OF 8 INCH, 200 FEET OF 4 INCH POLY ALONG FM 157 NORTH
OF NORTHEAST GREEN OAKS IN ARLINGTON. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ARLINGTON GROWTH DECEMBER
1464 080.60894 33
RELOCATE FACILITIES. INSTALL 849 FEET OF 2 INCH POLY AND ABANDON 1030
FEET OF 2 INCH STEEL ALONG MILL CREEK TO ACCOMMODATE CITY OF DALLAS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
1465 080.60897 363
RELOCATE FACILITIES. INSTALL 3280 FEET OF 4 INCH AND 600 FEET OF 6 INCH
POLY ALONG CHURCH STREET AND ABANDON 2635 FEET OF 2 INCH, 405 FEET OF
2 INCH, AND 575 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF PARIS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
RELOCATION OF
FACILITIES OCTOBER
1466 080.60898 168,475
INSTALL 4,000 FEET OF 2 INCH AND 320 FEET OF 4 INCH POLY ALONG NORTHEAST
GREEN OAKS IN ARLINGTON. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARLINGTON GROWTH DECEMBER
1467 080.60899 128
INSTALL 1082 FEET OF 10 INCH STEEL ALONG LINE M AND ABANDON 1074 FEET OF
10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS BARDWELL SYSTEM INTEGRITY OCTOBER
1468 080.60911 26
RELOCATE FACILITIES. INSTALL 210 FEET OF 2 INCH POLY ALONG HERNDON
STREET AND ABANDON 199 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES OCTOBER
1469 080.60914 45
INSTALL 8 FEET OF 8 INCH POLY AND 504 FEET OF 12 INCH POLY AND ABANDON
272 FEET OF 2 INCH POLY AND 33 FEET OF 8 INCH POLY AND 623 FEET OF 12 INCH
STEEL ALONG JAMES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
1470 080.60917 8,085 INSTALL AC MITIGATION ALONG LINE D17-4 IN COLLIN COUNTY. ALL CUSTOMERS PLANO SYSTEM INTEGRITY OCTOBER
1471 080.60922 181
RELOCATE FACILITIES. INSTALL 1430 FEET OF 2 INCH POLY AND 360 FEET OF 4
INCH POLY AND ABANDON 1370 FEET OF 2 INCH STEEL AND 400 FEET OF 4 INCH
STEEL AND 60 FEET OF 6 INCH POLY ALONG TRENCHARD TO ACCOMMODATE CITY
OF DECATUR STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR
RELOCATION OF
FACILITIES OCTOBER
1472 080.60930 111
INSTALL 1585 FEET OF 2 INCH POLY ALONG NORTHVIEW LANE AND ABANDON
1565 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1473 080.60931 12
RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH POLY AND 94 FEET OF 4 INCH
POLY AND ABANDON 100 FEET OF 2 INCH STEEL AND 88 FEET OF 4 INCH STEEL
ALONG DAVIS TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT
PROJECT CITY ARLINGTON OF STREET IMPROVEMENT PROJECT IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
1474 080.60933 53
INSTALL 1493 FEET OF 2 INCH POLY AND ABANDON 52 FEET OF 3 INCH POLY AND
1442 FEET OF 4 INCH STEEL ALONG VANCOUVER IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1475 080.60934 48
INSTALL 2351 FEET OF 2 INCH POLY ALONG CREST COVE AND ABANDON 2365
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1476 080.60942 63
RELOCATE FACILITIES. INSTALL 652 FEET OF 4 INCH POLY ALONG PARKER
HENDERSON ROAD AND ABANDON 169 FEET OF 2 INCH AND 7 FEET OF 3 INCH
AND 566 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1477 080.60943 6,660,151
AREA REPLACEMENT IN NORTHWEST DALLAS WITHIN THE BOUNDARIES OF
DENTON DRIVE, I635, INWOOD AND NORTHWEST HIGHWAY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1478 080.60944 89,945
AREA REPLACEMENT IN SOUTHWEST DALLAS WITHIN THE BOUNDARIES OF
TRINITY RIVER, I35E, WRIGHT AVENUE, AND LOOP 12 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1479 080.60946 10,953
FUNCTIONAL COCKRELL HILL ZONE 3 AREA REPLACEMENT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1480 080.60960 26
RELOCATE FACILITIES. INSTALL 1577 FEET OF 2 INCH POLY AND ABANDON 1260
FEET OF 2 INCH STEEL ALONG NURSERY ROAD TO ACCOMMODATE CITY OF
IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES SEPTEMBER
1481 080.60967 53
RELOCATE FACILITIES. INSTALL 371 FEET OF 2 INCH AND 562 FEET OF 4 INCH
POLY ALONG GOSHEN STREET AND ABANDON 404 FEET OF 2 INCH AND 464 FEET
OF 3 INCH STEEL AND 84 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF
CANTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CANTON
RELOCATION OF
FACILITIES OCTOBER
1482 080.61000 279
RELOCATE FACILITIES. INSTALL 1840 FEET OF 4 INCH POLY AND ABANDON 188
FEET OF 4 INCH POLY AND 1740 FEET OF 4 INCH STEEL ALONG NORTH STREET TO
ACCOMMODATE CITY OF MANSFIELD STREET PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD
RELOCATION OF
FACILITIES OCTOBER
1483 080.61007 35
INSTALL 1379 FEET OF 2 INCH POLY AND ABANDON 1900 FEET OF 2 INCH POLY
ALONG SHARON LEE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
1484 080.61042 13
ABANDON DRS12 AND 81 FEET OF 3 INCH STEEL AND INSTALL 81 FEET OF 6 INCH
POLY ALONG AVENUE M IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY SEPTEMBER
1485 080.61058 722
INSTALL 2427 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK
PHASE 7. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
1486 080.61069 15
INSTALL 708 FEET OF 2 INCH POLY ALONG COMMERCIAL AVENUE AND ABANDON
687 FEET OF 2 INCH STEEL AND 13 FEET OF 2 INCH AND 3 FEET OF 3 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANSON SYSTEM INTEGRITY SEPTEMBER
1487 080.61071 80
RELOCATE FACILITIES. INSTALL 4 FEET OF 3 INCH AND 1096 FEET OF 4 INCH AND
1041 FEET OF 6 INCH POLY AND ABANDON 1090 FEET OF 3 INCH POLY AND 318
FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF SAN ANGELO STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
RELOCATION OF
FACILITIES SEPTEMBER
1488 080.61072 20
INSTALL 498 FEET OF 4 INCH POLY ALONG COLUMBUS STREET AND ABANDON
419 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WEST SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 47 of 178
266
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1489 080.61075 (15)
INSTALL 9334 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 4 INCH AND 500
FEET OF 8 INCH POLY AND 8700 FEET OF 6 INCH STEEL ALONG LINE E16 IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER
1490 080.61087 31
INSTALL 318 FEET OF 2 INCH AND 325 FEET OF 6 INCH AND 304 FEET OF 12 INCH
POLY ALONG MILL STREET AND ABANDON 437 FEET OF 2 INCH STEEL AND 624
FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
1491 080.61088 1
INSTALL DISTRICT REGULATOR STATION 71 AND ABANDON DISTRICT REGULATOR
STATION IN ABILENE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
1492 080.61101 2,048
RELOCATE FACILITIES. INSTALL 134 FEET OF 2 INCH POLY AND 443 FEET OF 4
INCH POLY AND ABANDON 95 FEET OF 2 INCH STEEL AND 375 FEET OF 3 INCH
STEEL AND 479 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF CHICO STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CHICO
RELOCATION OF
FACILITIES OCTOBER
1493 080.61116 5
INSTALL 333 FEET OF 2 INCH POLY ALONG CEDAR AND ABANDON 262 FEET OF 2
INCH STEEL AND 65 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
1494 080.61119 19
RELOCATE FACILITIES. INSTALL 267 FEET OF 4 INCH POLY AND 170 FEET OF 6
INCH POLY AND ABANDON 263 FEET OF 3 INCH STEEL AND 167 FEET OF 6 INCH
STEEL ALONG SPRING GROVE TO ACCOMMODATE CITY OF DALLAS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
1495 080.61121 7,745
RELOCATE FACILITIES. INSTALL 600 FEET OF 4 INCH POLY AND 1409 FEET OF 6
INCH POLY AND ABANDON 1469 FEET OF 6 INCH STEEL AND 445 FEET OF 8 INCH
STEEL ALONG US 67 TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
1496 080.61133 19
PURCHASE (25) MOTORIZED REGULATORS AND ABANDON (25) MOTORIZED
REGULATORS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1497 080.61144 15
INSTALL 16 FEET OF 2 INCH AND 17 FEET OF 8 INCH POLY ALONG DONALD AND
ABANDON 3 INCH FLANGE VALVE AND 23 FEET OF 3 INCH AND 9 FEET OF 8 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
1498 080.61146 332
RELOCATE FACILITIES. INSTALL (40) POLY SERVICES AND ABANDON (40) STEEL
SERVICES ALONG EAST MITCHELL STREET TO ACCOMMODATE THE CITY OF
ARLINGTON PAVING AND DRAINAGE PLAN IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
1499 080.61162 13
RELOCATE FACILITIES. INSTALL 339 FEET OF 2 INCH POLY ALONG BEVERLY DRIVE
AND ABANDON 334 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF BEVERLY
HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEVERLY HILLS
RELOCATION OF
FACILITIES SEPTEMBER
1500 080.61165 0
ABANDON 2835 FEET OF 2 INCH, 1577 FEET OF 3 INCH AND 1580 FEET OF 8 INCH
STEEL ALONG HOMEVIEW AVENUE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1501 080.61182 378
INSTALL 1275 FEET OF 2 INCH POLY AND ABANDON 800 FEET OF 4 INCH AND 300
FEET OF 8 INCH CAST IRON ALONG SCURRY STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1502 080.61183 152
INSTALL 1455 FEET OF 2 INCH POLY ALONG SAN JACINTO STREET AND ABANDON
200 FEET OF 4 INCH, 1000 FEET OF 8 INCH CAST IRON AND 335 FEET OF 8 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1503 080.61193 36
RELOCATE FACILITIES. INSTALL 55 FEET OF 2 INCH AND 171 FEET OF 4 INCH POLY
ALONG NANCY DRIVE AND ABANDON 40 FEET OF 2 INCH POLY AND 37 FEET OF 3
INCH AND 106 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF GLEN ROSE
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GLEN ROSE
RELOCATION OF
FACILITIES OCTOBER
1504 080.61196 204
INSTALL (2) DISTRICT REGULATOR STATIONS AND 200 FEET OF 6 INCH STEEL
ALONG COMANCHE STREET AND ABANDON (2) DISTRICT REGULLATOR STATIONS
AND 200 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER
1505 080.61204 4
INSTALL 380 FEET OF 2 INCH POLY AND ABANDON 377 FEET OF 2 INCH STEEL
ALONG MLK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY SEPTEMBER
1506 080.61214 146,395
INSTALL 2200 FEET OF 20 INCH STEEL ALONG THE STREETS OF VILLAGE CREEK
SUBDIVISION AND ABANDON 1850 FEET OF 20 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KENNEDALE SYSTEM INTEGRITY OCTOBER
1507 080.61216 44
INSTALL 59 FEET OF 2 INCH AND 8 FEET OF 4 INCH AND 6 FEET OF 8 INCH STEELK
ALONG KC30 AND ABANDON 60 FEET OF 2 INCH, 4 FEET OF 4 INCH AND 5 FEET OF
8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CLYDE SYSTEM INTEGRITY OCTOBER
1508 080.61227 44
INSTALL 1420 FEET OF 4 INCH POLY ALONG MAURICE AVENUE AND ABANDON 474
FEET OF 6 INCH STEEL, 428 FEET OF 4 INCH, 166 FEET OF 6 INCH CAST IRON AND
86 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1509 080.61247 95,224
RELOCATE FACILITIES. INSTALL 2,187 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY
AND ABANDON 140 FEET OF 6 INCH, 2,045 FEET OF 4 INCH, 30 FEET OF 3 INCH AND
2,150 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DENTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1510 080.61259 61
RELOCATE FACILITIES. INSTALL 1900 FEET OF 4 INCH POLY AND ABANDON 940
FEET OF 3 INCH POLY ALONG AIRPORT ROAD TO ACCOMMODATE CITY OF
DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1511 080.61272 8
INSTALL 520 FEET OF 2 INCH POLY ALONG EAST MORRIS STREET AND ABANDON
510 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY SEPTEMBER
1512 080.61273 12
INSTALL 535 FEET OF 2 INCH POLY ALONG MAGNOLIA STREET AND ABANDON 108
FEET OF 2 INCH POLY AND 163 FEET OF 3 INCH AND 688 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY OCTOBER
1513 080.61278 729
INSTALL 177 FEET OF 2 INCH POLY AND 473 FEET OF 4 INCH POLY ALONG
GRAYSON STREET. ABANDON 546 FEET OF 2 INCH STEEL AND 6 FEET OF 2 INCH
POLY AND 8 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS POTTSBORO SYSTEM INTEGRITY OCTOBER
1514 080.61300 1,649
INSTALL 1,420 FEET OF 2 INCH AND 3,800 FEET OF 4 INCH POLY ALONG BOX
CANYON DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL NOLANVILLE GROWTH DECEMBER
1515 080.61305 10
RELOCATE FACILITIES. INSTALL 116 FEET OF 4 INCH POLY ALONG HARDIN STREET
AND ABANDON 116 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF MCKINNEY
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES OCTOBER
1516 080.61307 190
RELOCATE FACILITIES. INSTALL 1584 FEET OF 4 INCH POLY AND ABANDON 414
FEET OF 2 INCH STEEL AND 1338 FEET OF 4 INCH POLY ALONG CULLUM DRIVE TO
ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
1517 080.61310 7,656
INSTALL 15 FEET OF 2 INCH POLY AND 22 FEET OF 3 INCH POLY AND 1538 FEET OF
8 INCH POLY ALONG COIT ROAD AND ABANDON 23 FEET OF 2 INCH STEEL AND 28
FEET OF 3 INCH STEEL AND 1491 FEET OF 8 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY OCTOBER
1518 080.61312 50
INSTALL 1829 FEET OF 2 INCH POLY AND ABANDON 1795 FEET OF 3 INCH STEEL
AND 670 FEET OF 4 INCH STEEL AND 62 FEET OF 4 INCH POLY ALONG OLD BETSY
ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEENE SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 48 of 178
267
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1519 080.61319 2
INSTALL RELIEF VALVE AT DISTRICT REGULATOR STATION 01 ALONG ORIENT AND
ABANDON RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ODELL SYSTEM INTEGRITY SEPTEMBER
1520 080.61325 2
RELOCATE FACILITIES. INSTALL 280 FEET OF 2 INCH POLY ALONG DUTTON
AVENUE AND ABANDON 385 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES SEPTEMBER
1521 080.61326 5,121
INSTALL 2000 FEET OF 4 INCH AND 370 FEET OF 2 INCH POLY ALONG KIEST
BOULEVARD AND ABANDON 2000 FEET OF 8 INCH AND 370 FEET OF 2 INCH STEEL
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1522 080.61327 2,335
INSTALL 3668 FEET OF 4 INCH POLY AND ABANDON 1415 FEET OF 4 INCH AND 303
FEET OF 6 INCH CAST IRON ALONG BIGHAM BOULEVARD IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1523 080.61338 391
INSTALL 52 FEET OF 2 INCH POLY ALONG HAYNIE AVENUE AND 1556 FEET OF 4
INCH POLY AND ABANDON 1553 FEET OF 6 INCH CAST IRON AND 3 FEET OF 6 INCH
POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER
1524 080.61343 1,257
INSTALL 2300 FEET OF 4 INCH POLY ALONG LOCKE AVENUE AND ABANDON 1229
FEET OF 8 INCH, 821 FEET OF 4 INCH CAST IRON, 305 FEET OF 4 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1525 080.61348 2,071
RELOCATE FACILITIES. ABANDON 242 FEET OF 1.25 INCH POLY AND 1973 FEET OF
2 INCH POLY ALONG LAKESHORE DRIVE TO ACCOMMODATE CITY OF LITTLE ELM
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS LITTLE ELM
RELOCATION OF
FACILITIES OCTOBER
1526 080.61362 10,304
INSTALL 610 FEET OF 4 INCH POLY AND 1936 FEET OF 12 INCH POLY ALONG
MALVEY ROAD AND ABANDON 1108 FEET OF 4 INCH POLY AND 1926 FEET OF 12
INCH STEEL AND 25 FEET OF 16 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1527 080.61371 711
RELOCATE FACILITIES. INSTALL 1587 FEET OF 4 INCH POLY ALONG EDGEHILL
ROAD AND ABANDON 620 FEET OF 6 INCH AND 235 FEET OF 8 INCH CAST IRON TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1528 080.61373 7,010
INSTALL 3458 FEET OF 2 INCH POLY AND 761 FEET OF 4 INCH POLY AND 696 FEET
OF 6 INCH POLY ALONG PORTER FARM ROAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
1529 080.61375 23
RELOCATE FACILITIES. INSTALL 353 FEET OF 4 INCH POLY AND ABANDON 1225
FEET OF 2 INCH STEEL AND 20 FEET OF 2 INCH POLY ALONG HILLDALE ROAD TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1530 080.61392 18,360
INSTALL 3895 FEET OF 10 INCH STEEL AND ABANDON 3751 FEET OF 12 INCH
STEEL ALONG LINE M IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS KEENE SYSTEM INTEGRITY OCTOBER
1531 080.61398 53
INSTALL 1175 FEET OF 4 INCH POLY AND ABANDON 1143 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
1532 080.61404 4
INSTALL 127 FEET OF 4 INCH POLY ALONG SENLAC DRIVE AND ABANDON 111 FEET
OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY SEPTEMBER
1533 080.61408 8
INSTALL 315 FEET OF 2 INCH POLY ALONG ORCHARD STREET AND ABANDON 297
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FREDERICKSBURG SYSTEM INTEGRITY SEPTEMBER
1534 080.61410 167
INSTALL 1900 FEET OF 4 INCH ALONG MACARTHUR BOULEVARD AND ABANDON
1200 FEET OF 4 INCH AND 1260 FEET OF 2 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER
1535 080.61414 33,682
RELOCATE FACILITIES. INSTALL 1104 FEET OF 2 INCH POLY AND 1877 FEET OF 8
INCH POLY AND 555 FEET OF 12 INCH STEEL AND ABANDON 350 FEET OF 2 INCH
STEEL AND 890 FEET OF 2 INCH POLY AND 185 FEET OF 6 INCH STEEL AND 3385
FEET OF 8 INCH STEEL AND 95 FEET OF 8 INCH POLY AND 375 FEET OF 12 INCH
STEEL ALONG DALLAS STREETS TO ACCOMMODATE CITY OF DALLAS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
1536 080.61436 62
RELOCATE FACILITIES. INSTALL 1047 FEET OF 2 INCH POLY ALONG CAIRN CIRCLE
AND ABANDON 1040 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1537 080.61438 186
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY ALONG MORRISON
STREET AND ABANDON 500 FEET OF 1.25 INCH STEEL TO ACCOMMODATE CITY OF
ATHENS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
RELOCATION OF
FACILITIES OCTOBER
1538 080.61444 988
RELOCATE FACILITIES. INSTALL 1076 FEET OF 6 INCH AND 958 FEET OF 2 INCH
POLY ALONG WAYSIDE AVENUE AND ABANDON 1062 FEET OF 6 INCH, 963 FEET OF
2 INCH STEEL, 73 FEET OF 6 INCH AND 187 FEET OF 2 INCH POLY TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1539 080.61448 15
RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG UPLAND AND
ABANDON 380 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF MESQUITE
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
RELOCATION OF
FACILITIES OCTOBER
1540 080.61453 (681)
RELOCATE FACILITIES. INSTALL 3100 FEET OF 4 INCH AND 200 FEET OF 2 INCH
POLY ALONG HOUSTON STREET AND ABANDON 3080 FEET OF 4 INCH, 90 FEET OF
2 INCH STEEL AND 90 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF KAUFMAN
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN
RELOCATION OF
FACILITIES OCTOBER
1541 080.61461 33
RELOCATE FACILITIES. INSTALL 340 FEET OF 4 INCH POLY ALONG DEER PARK
ROAD AND ABANDON 830 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF
DECATUR STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR
RELOCATION OF
FACILITIES OCTOBER
1542 080.61462 3,881
RELOCATE FACILITIES. INSTALL 21 FEET OF 2 INCH POLY AND 223 FEET OF 4 INCH
POLY AND ABANDON 25 FEET OF 2 INCH STEEL AND 216 FEET OF 4 INCH STEEL
ALONG KING ROW TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1543 080.61475 243
RELOCATE FACILITIES. INSTALL 185 FEET OF 2 INCH, 1060 FEET OF 4 INCH AND
2940 FEET OF 6 INCH POLY ALONG 5TH STREET AND ABANDON 2495 FEET OF 3
INCH STEEL, 175 FEET OF 2 INCH AND 1050 FEET OF 3 INCH POLY TO
ACCOMMODATE CITY OF SACHSE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SACHSE
RELOCATION OF
FACILITIES OCTOBER
1544 080.61482 52
INSTALL 1455 FEET OF 2 INCH POLY ALONG KENWELL AND ABANDON 1455 FEET
OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1545 080.61488 56
RELOCATE FACILITIES. INSTALL 1000 FEET OF 2 INCH POLY ALONG LA SALLE
DRIVE AND ABANDON 1000 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
RELOCATION OF
FACILITIES OCTOBER
1546 080.61493 6
RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH POLY ALONG LATTIMORE
DRIVE AND ABANDON 220 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
1547 080.61502 3
INSTALL 300 FEET OF 4 INCH POLY ALONG COGGIN AND ABANDON 300 FEET OF 4
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY SEPTEMBER
1548 080.61533 75
INSTALL 583 FEET OF 2 INCH POLY AND ABANDON 563 FEET OF 2 INCH STEEL
AND 10 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 49 of 178
268
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1549 080.61538 3
ABANDON DISTRICT REGULATOR STATION 28 ALONG RANDOLPH STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY SEPTEMBER
1550 080.61540 523
INSTALL 2260 FEET OF 6 INCH POLY ALONG COBER DRIVE AND ABANDON 2260
FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
1551 080.61544 5,460
RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH POLY AND 720 FEET OF 4
INCH POLY AND 1210 FEET OF 6 INCH POLY ALONG VALERA COURT AND ABANDON
114 FEET OF 2 INCH STEEL AND 42 FEET OF 4 INCH POLY AND 765 FEET OF 6 INCH
STEEL AND 46 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1552 080.61545 2
RELOCATE FACILITIES. INSTALL 30 FEET OF 4 INCH POLY ALONG AUGUSTA
STREET AND ABANDON 20 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF THE
COLONY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THE COLONY
RELOCATION OF
FACILITIES SEPTEMBER
1553 080.61552 4,196
INSTALL 2790 FEET OF 4 INCH POLY AND ABANDON 1475 FEET OF 8 INCH STEEL
AND 390 FEET OF 8 INCH POLY ALONG NORTH FIELDER ROAD IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
1554 080.61558 3
INSTALL FLOW SAFE RELIEF VALVE AND ABANDON ROKWELL RELIEF VALVE AT
CLARKSVILLE DISTRICT REGULATOR STATION 7 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLARKSVILLE SYSTEM INTEGRITY SEPTEMBER
1555 080.61566 1,362
RELOCATE FACILITIES. INSTALL 503 FEET OF 2 INCH POLY AND 235 FEET OF 4
INCH POLY AND ABANDON 10 FEET OF 2 INCH STEEL AND 480 FEET OF 2 INCH
POLY AND 6 FEET OF 3 INCH POLY AND 2 FEET OF 4 INCH STEEL AND 32 FEET OF 4
INCH POLY ALONG JOHNSON STREET TO ACCOMMODATE CITY OF MCKINNEY
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES OCTOBER
1556 080.61573 153
INSTALL 1428 FEET OF 2 INCH POLY ALONG BROOKHOLLOW AND ABANDON 1403
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS TYLER SYSTEM INTEGRITY OCTOBER
1557 080.61594 42,740,125
DALLAS CAST IRON REPLACEMENT FUNCTIONAL PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
1558 080.61595 12,636,736
FUNCTIONAL FORT WORTH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
1559 080.61597 2,083,886
FUNCTIONAL DALLAS UNIVERSITY PARK CAST IRON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1560 080.61600 26
RELOCATE FACILITIES. INSTALL 781 FEET OF 2 INCH POLY AND ABANDON 768
FEET OF 2 INCH STEEL ALONG OVERLAKE STREET TO ACCOMMODATE CITY OF
RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
RELOCATION OF
FACILITIES SEPTEMBER
1561 080.61622 82,200
RELOCATE FACILITIES. INSTALL 1,863 FEET OF 6 INCH POLY, 749 FEET OF 4 INCH
AND 170 FEET OF 2 INCH POLY ALONG FM 1417 AND ABANDON 1,615 FEET OF 2
INCH, 186 FEET OF 2 INCH, 312 FEET OF 3 INCH, AND 576 FEET OF 4 INCH POLY TO
ACCOMMODATE CITY OF SHERMAN TXDOT PROJECT IN ACCORDANCE WIT
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
RELOCATION OF
FACILITIES OCTOBER
1562 080.61625 5,597
ABANDON 200 FEET OF 8 INCH STEEL ALONG SOLANA BOULEVARD TO
ACCOMMODATE TEXAS DEPARTMENT OF TRANSPORTATION STATE HIGHWAY
IMPROVEMENT PROJECT IN THE CITY OF WESTLAKE, TEXAS, TARRANT COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTLAKE SYSTEM INTEGRITY OCTOBER
1563 080.61630 7
INSTALL GROUNDBED AND POLE ALONG 2ND STREET IN ORDER TO PROVIDE
ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY SEPTEMBER
1564 080.61634 754
INSTALL 1110 FEET OF 2 INCH AND 380 FEET OF 4 INCH POLY AND ABANDON 740
FEET OF 4 INCH, 370 FEET OF 6 INCH AND 360 FEET OF 8 INCH CAST IRON ALONG
PEMBROKE AVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1565 080.61641 23
INSTALL WELD SLEEVE ALONG LINE D DIG IN DALLAS COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY SEPTEMBER
1566 080.61651 17
RELOCATE FACILITIES. INSTALL 345 FEET OF 2 INCH POLY AND ABANDON 365
FEET OF 2 INCH STEEL ALONG RIDGEWOOD DRIVE TO ACCOMMODATE CITY OF
PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES SEPTEMBER
1567 080.61652 235,229
RELOCATE FACILITIES. INSTALL 950 FEET OF 2 INCH, 7500 FEET OF 4 INCH AND
5750 FEET OF 6 INCH POLY ALONG CRANBROOK DRIVE AND ABANDON 1010 FEET
OF 2 INCH, 325 FEET OF 3 INCH AND 1250 FEET OF 4 INCH POLY AND 420 FEET OF 2
INCH AND 5150 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF
COLLEYVILLE ROADWAY IMPROVEMENTS IN ACCORDANCE WITH TEXAS RAILROAD
COMMISSION RULE 8.209. ALL CUSTOMERS COLLEYVILLE
RELOCATION OF
FACILITIES OCTOBER
1568 080.61671 12
INSTALL 250 FEET OF 4 INCH AND 30 FEET OF 6 INCH POLY ALONG PARADISE AND
ABANDON 250 FEET OF 4 INCH STEEL AND 30 FEET OF 6 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY SEPTEMBER
1569 080.61672 206
RELOCATE FACILITIES. INSTALL 1300 FEET OF 2 INCH POLY ALONG LONSDALE
AVENUE AND ABANDON 1300 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF
DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
1570 080.61677 14
RELOCATE FACILITIES. INSTALL 542 FEET OF 2 INCH POLY ALONG WIND RIVER
LANE AND ABANDON 420 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES SEPTEMBER
1571 080.61684 12
INSTALL 5 FEET OF 12 INCH HALF SOLE ALONG CA(2ND) EAST IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1572 080.61686 5,115
INSTALL 2166 FEET OF 6 INCH POLY AND ABANDON 2160 FEET OF 6 INCH STEEL
AND 171 FEET OF 6 INCH POLY ALONG WALNUT STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
1573 080.61688 4,154
RELOCATE FACILITIES. INSTALL 632 FEET OF 6 INCH POLY AND ABANDON 564
FEET OF 6 INCH POLY ALONG BERKSHIRE LAKE TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1574 080.61692 39
INSTALL 387 FEET OF 3 INCH STEEL AND ABANDON 370 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILFORD SYSTEM INTEGRITY OCTOBER
1575 080.61696 (0)
ABANDON 290 FEET OF 3 INCH POLY ALONG SANDERS STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FROST SYSTEM INTEGRITY SEPTEMBER
1576 080.61699 2,402
INSTALL 1313 FEET OF 2 INCH POLY AND ABANDON 1308 FEET OF 2 INCH STEEL
ALONG DAKOTA DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
1577 080.61702 2,858
INSTALL 1380 FEET OF 4 INCH POLY ALONG WEST CELESTE DRIVE AND ABANDON
1370 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
1578 080.61715 2
INSTALL 16 FEET OF 8 INCH POLY AND ABANDON 30 FEET OF 3 INCH STEEL AND
25 FEET OF 8 INCH STEEL ALONG HAMPTON ROAD IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1579 080.61716 21
RELOCATE FACILITIES. INSTALL 624 FEET OF 2 INCH POLY ALONG EAST ELLIS
STREET AND ABANDON 624 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
LLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LLANO
RELOCATION OF
FACILITIES OCTOBER
1580 080.61718 1,056
INSTALL 1470 FEET OF 2 INCH POLY AND 2217 FEET OF 4 INCH POLY ALONG PARK
LANE AND ABANDON 1320 FEET OF 2 INCH STEEL AND 665 FEET OF 2 INCH POLY
AND 2210 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1581 080.61721 26
RELOCATE FACILITIES. INSTALL 370 FEET OF 6 INCH POLY AND ABANDON 370
FEET OF 6 INCH POLY ALONG STEINBECK BEND ROAD TO ACCOMMODATE CITY OF
WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES SEPTEMBER
MTX Additions
Page 50 of 178
269
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1582 080.61724 22
INSTALL 510 FEET OF 4 INCH POLY AND ABANDON 408 FEET OF 3 INCH POLY
ALONG BEADY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
1583 080.61750 59
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH AND 80 FEET OF 4 INCH POLY
AND ABANDON 500 FEET OF 2 INCH AND 80 FEET OF 4 INCH STEEL ALONG
HAWKINS STREET TO ACCOMMODATE CITY OF WAXAHACHIE STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
RELOCATION OF
FACILITIES OCTOBER
1584 080.61774 9
INSTALL 24 FEET OF 2 INCH AND 14 FEET OF 4 INCH POLY AND ABANDON 12 FEET
OF 4 INCH STEEL AND 20 FEET OF 4 INCH POLY AND REPLACE DRS01 ALONG
SHERMAN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY OCTOBER
1585 080.61787 410
RELOCATE FACILITIES. INSTALL 400 FEET OF 6 INCH POLY AND ABANDON 400
FEET OF 6 POLY ALONG INDUSTRIAL BOULEVARD TO ACCOMMODATE CITY OF
MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES OCTOBER
1586 080.61794 24
INSTALL 1 FEET OF 3 INCH POLY AND 32 FEET OF 4 INCH POLY AND 35 FEET OF 6
INCH POLY ALONG WEST PARK STREET, ABANDON 30 FEET OF 2 INCH POLY AND
24 FEET OF 6 INCH STEEL AND 4 FEET OF 6 INCH POLY, AND REPLACE DRS24 IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
1587 080.61795 43
RELOCATE FACILITIES. INSTALL 860 FEET OF 2 INCH POLY AND ABANDON 830
FEET OF 2 INCH STEEL ALONG BRIARMEADOW DRIVE TO ACCOMMODATE CITY OF
DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
1588 080.61799 2,576
INSTALL 700 FEET OF 4 INCH POLY ALONG 26TH STREET AND ABANDON 413 FEET
OF 3 INCH, 141 FEET OF 4 INCH STEEL AND 5 FEET OF 4 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER
1589 080.61807 45
INSTALL (5) 220 STYLE WELD SLEEVES ALONG LINE D IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY SEPTEMBER
1590 080.61845 3
ABANDON 9 FEET OF 2 INCH AND 294 FEET OF 3 INCH STEEL ALONG SH22 IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FROST SYSTEM INTEGRITY SEPTEMBER
1591 080.61855 10
INSTALL 516 FEET OF 2 INCH POLY AND ABANDON 312 FEET OF 2 INCH STEEL
AND 155 FEET OF 4 INCH STEEL AND 64 FEET OF 2 INCH POLY ALONG FILLMORE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
1592 080.61880 877
INSTALL 49 FEET OF 4 INCH, 6140 FEET OF 6 INCH, 314 FEET OF 12 INCH POLY, AND
110 FEET OF 16 INCH STEEL CASING ALONG COUNTY ROAD 368. DEVELOPER
INSTALLED FACILITIES. ALL CUSTOMERS ANNA GROWTH MARCH
1593 080.61884 415
RELOCATE FACILITIES. INSTALL 215 FEET OF 2 INCH AND 1135 FEET OF 4 INCH
AND 660 FEET OF 6 INCH POLY ALONG CRAWFORD AND ABANDON 1990 FEET OF 2
INCH POLY TO ACCOMMODATE CITY OF FATE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FATE
RELOCATION OF
FACILITIES OCTOBER
1594 080.61891 133
INSTALL 665 FEET OF 2 INCH POLY ALONG MILLER AND ABANDON 665 FEET OF 2
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEYMOUR SYSTEM INTEGRITY OCTOBER
1595 080.61892 23
INSTALL 300 FEET OF 2 INCH POLY ALONG HIGHWAY 380 AND ABANDON 300 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS THROCKMORTON SYSTEM INTEGRITY OCTOBER
1596 080.61893 16
INSTALL 335 FEE OF 2 INCH POLY ALONG IDAHO AND ABANDON 335 FEET OF 2
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEYMOUR SYSTEM INTEGRITY SEPTEMBER
1597 080.61899 14
RELOCATE FACILITIES. INSTALL 70 FEET OF 2 INCH AND 930 FEET OF 4 INCH POLY
AND ABANDON 60 FEET OF 2 INCH AND 900 FEET OF 4 INCH POLY ALONG
FIREWHEEL DRIVE TO ACCOMMODATE CITY OF FLOWER MOUND STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
RELOCATION OF
FACILITIES SEPTEMBER
1598 080.61903 20
INSTALL 100 FEET OF 2 INCH AND 20 FEET OF 4 INCH AND 250 FEET OF 8 INCH
POLY ALONG UNIVERSITY HILLS BOULEVARD AND ABANDON 98 FEET OF 2 INCH
AND 18 FEET OF 3 INCH AND 245 FEET OF 8 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1599 080.61912 1,093
INSTALL 400 FEET OF 4 INCH POLY ALONG EAST WALKER AND ABANDON 400 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY OCTOBER
1600 080.61916 82
RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG GOSHEN AND
ABANDON 280 FEET OF 2 INCH POLY AND 620 FEET OF 2 INCH STEEL TO
ACCOMMODATE CITY OF CANTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CANTON
RELOCATION OF
FACILITIES OCTOBER
1601 080.61918 28,383
RELOCATE FACILITIES. INSTALL 375 FEET OF 4 INCH AND 60 FEET OF 6 INCH POLY
ALONG WENTWORTH STREET AND ABANDON 375 FEET OF 4 INCH AND 60 FEET OF
6 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1602 080.61919 8
ABANDON DISTRICT REGULATOR STATION 3 IN MCGREGOR IN MCLENNAN
COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY SEPTEMBER
1603 080.61928 1,108
RELOCATE FACILITIES. INSTALL 2880 FEET OF 4 INCH POLY ALONG STUART ROAD
AND ABANDON 59 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DENTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1604 080.61930 2,958
RELOCATE FACILITIES. INSTALL 1297 FEET OF 2 INCH POLY AND ABANDON 816
FEET OF 2 INCH POLY ALONG COUNTRY CLUB ROAD TO ACCOMMODATE CITY OF
ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
1605 080.61931 153
RELOCATE FACILITIES. INSTALL 1710 FEET OF 2 INCH POLY ALONG 4TH STREET
AND ABANDON 1480 FEET OF 2 INCH AND 270 FEET OF 4 INCH STEEL TO
ACCOMMODATE CITY OF KENNEDALE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KENNEDALE
RELOCATION OF
FACILITIES OCTOBER
1606 080.61937 1,488
RELOCATE FACILITIES. INSTALL 1320 FEET OF 4 INCH AND 400 FEET OF 2 INCH
POLY ALONG FM148 AND ABANDON 1310 FEET OF 4 INCH STEEL AND 290 FEET OF
2 INCH POLY TO ACCOMMODATE CITY OF SCURRY STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SCURRY
RELOCATION OF
FACILITIES OCTOBER
1607 080.61944 1
RELOCATE FACILITIES. INSTALL 72 FEET OF 2 INCH POLY ALONG 1ST AVENUE AND
ABANDON 72 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
1608 080.61946 3
RELOCATE FACILITIES. ABANDON 346 FEET OF 4 INCH POLY ALONG SIMONDALE
DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1609 080.61947 67
INSTALL DISTRICT REGULATOR STATION AND RELIEF VALVE AT CORSICANA
DISTRICT REGULATOR STATION 20 AND ABANDON DISTRICT REGULATOR STATION
AND RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
1610 080.61964 3,808
INSTALL 1300 FEET OF 4 INCH POLY ALONG SHERWOOD DRIVE AND ABANDON
1050 FEET OF 3 INCH STEEL AND 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY OCTOBER
1611 080.61965 42,198
INSTALL 17,000 FEET OF 6 INCH STEEL AND ABANDON 17,000 FEET OF 3 INCH
STEEL ON LINE S6 IN ELLIS COUNTY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RED OAK SYSTEM INTEGRITY OCTOBER
1612 080.61985 20
INSTALL 430 FEET OF 6 INCH AND 85 FEET OF 2 INCH POLY ALONG 7TH STREET
AND ABANDON 428 FEET OF 8 INCH AND 346 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 51 of 178
270
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1613 080.61989 3,097
RELOCATE FACILITIES. INSTALL 2357 FEET OF 4 INCH POLY ALONG SOMERVILLE
PLACE AND ABANDON 2620 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1614 080.61991 69
RELOCATE FACILITIES. INSTALL 520 FEET OF 4 INCH AND 40 FEET OF 2 INCH POLY
ALONG ELLA YOUNG DRIVE AND ABANDON 520 FEET OF 4 INCH AND 40 FEET OF 2
INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1615 080.61994 131
RELOCATE FACILITIES. INSTALL 380 FEET OF 6 INCH AND 180 FEET OF 2 INCH
POLY ALONG 23RD STREET AND ABANDON 380 FEET OF 6 INCH AND 180 FEET OF 2
INCH STEEL TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
RELOCATION OF
FACILITIES OCTOBER
1616 080.61995 89,170
RELOCATE FACILITIES. ABANDON 96 FEET OF 2 INCH POLY AND 1046 FEET OF 10
INCH STEEL ALONG SMITH TO ACCOMMODATE CITY OF DENTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1617 080.62004 2,205
INSTALL 2200 FEET OF 2 INCH ALONG TAYLOR STREET AND ABANDON 1492 FEET
OF 4 INCH STEEL, 756 FEET OF 3 INCH, 105 FEET OF 4 INCH POLY AND 160 FEET OF
2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GAINESVILLE SYSTEM INTEGRITY OCTOBER
1618 080.62014 490
RELOCATE FACILITIES. INSTALL 3138 FEET OF 4 INCH POLY ALONG TEX
BOULEVARD AND ABANDON 2621 FEET OF 4 INCH CAST IRON AND 40 FEET OF 4
INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1619 080.62019 8,674
RELOCATE FACILITIES. INSTALL 2500 FEET OF 8 INCH POLY ALONG TIERNEY ROAD
AND ABANDON 2353 FEET OF 16 INCH, 69 FEET OF 4 INCH, 39 FEET OF 2 INCH
STEEL AND 2239 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1620 080.62034 865
RELOCATE FACILITIES. INSTALL 2000 FEET OF 6 INCH POLY ALONG MIDWAY ROAD
AND ABANDON 2000 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
LEWISVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE
RELOCATION OF
FACILITIES OCTOBER
1621 080.62036 3,623
INSTALL 9460 FEET OF 4 INCH POLY ALONG DALLAS STREET AND ABANDON 7500
FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS RICE SYSTEM INTEGRITY OCTOBER
1622 080.62044 430
INSTALL 3800 FEET OF 2 INCH POLY ALONG HIGHWAY 80 AND ABANDON 3800 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER
1623 080.62048 (45)
INSTALL 11,250 FEET OF 2 INCH, 2561 FEET OF 4 INCH, AND 2735 FEET OF 6 INCH
POLY ALONG THE STREETS OF THE DOVE CREEK SUBDIVISION. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH JANUARY
1624 080.62049 1,170
RELOCATE FACILITIES. INSTALL 690 FEET OF 2 INCH POLY AND ABANDON 680
FEET OF 2 INCH POLY ALONG FLORES DRIVE TO ACCOMMODATE CITY OF
GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
1625 080.62052 1,350
INSTALL MEASURING STATION AND 400 FEET OF 6 INCH POLY AND ABANDON
1400 FEET OF 6 INCH STEEL ALONG STREETS OF DALLAS GLOBAL DEVELOPMENT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1626 080.62053 997
INSTALL 2955 FEET OF 4 INCH AND 1623 FEET OF 2 INCH POLY ALONG AVENUE J
AND ABANDON 3967 FEET OF 3 INCH STEEL AND 20 FEET OF 2 INCH STEEL AND
132 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON SYSTEM INTEGRITY OCTOBER
1627 080.62055 12
INSTALL 455 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 560 FEET
OF 4 INCH, 92 FEET OF 3 INCH AND 25 FEET OF 2 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAINT JO SYSTEM INTEGRITY OCTOBER
1628 080.62065 11
INSTALL 495 FEET OF 2 INCH POLY ALONG SHADY OAKS STREET AND ABANDON
395 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BURNET SYSTEM INTEGRITY SEPTEMBER
1629 080.62070 115
RELOCATE FACILITIES. INSTALL 150 FEET OF 4 INCH POLY ALONG WOODARD
AVENUE AND ABANDON 1074 FEET OF 4 INCH STEEL, 10 FEET OF 3 INCH AND 37
FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF CLEBURNE STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
RELOCATION OF
FACILITIES OCTOBER
1630 080.62072 509
REPLACE DISTRICT REGULATOR STATION 1 ALONG OKLAHOMA AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER
1631 080.62084 10
RELOCATE FACILITIES. INSTALL 44 FEET OF 2 INCH POLY ALONG HAYS STREET
AND ABANDON 44 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF KERRVILLE
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
RELOCATION OF
FACILITIES OCTOBER
1632 080.62089 0
ABANDON 180 FEET OF 6 INCH STEEL ALONG GLENBROOK IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
1633 080.62092 98,408
RELOCATE FACILITIES. INSTALL 108 FEET OF 2 INCH, 1145 FEET OF 4 INCH AND 650
FEET OF 8 INCH POLY ALONG US380 AND ABANDON 120 FEET OF 2 INCH, 310 FEET
OF 3 INCH AND 1000 FEET OF 4 INCH POLY TO ACCOMMODATE TXDOT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1634 080.62093 61,832
RELOCATE FACILITIES. INSTALL 402 FEET OF 6 INCH POLY, 2,226 FEET OF 4 INCH
POLY, 10 FEET OF 2 INCH POLY AND ABANDON 328 FEET OF 4 INCH POLY AND 20
FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF SANGER PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER
RELOCATION OF
FACILITIES OCTOBER
1635 080.62099 5
INSTALL 125 FEET OF 4 INCH AND 225 FEET OF 2 INCH POLY ALONG WEST 26TH
STREET AND ABANDON 125 FEET OF 3 INCH AND 225 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER
1636 080.62102 2,215
RELOCATE FACILITIES. INSTALL 1546 FEET OF POLY ALONG SHANNON AND
ABANDON 205 FEET OF 2 INCH STEEL AND 1580 FEET OF 3 INCH AND 6 INCH POLY
TO ACCOMMODATE CITY OF GEORGETOWN STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN
RELOCATION OF
FACILITIES OCTOBER
1637 080.62146 65
INSTALL 430 FEET OF 2 INCH POLY ALONG EMERSON LANE AND ABANDON 290
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER
1638 080.62151 46
INSTALL 1525 FEET OF 4 INCH POLY ALONG CALHOUN STREET AND ABANDON 493
FEET OF 12 INCH STEEL AND 507 FEET OF 3 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1639 080.62160 3,981
RELOCATE FACILITIES. INSTALL 1460 FEET OF 4 INCH AND 1140 FEET OF 2 INCH
POLY ALONG FM 984 AND ABANDON 2600 FEET OF 2 INCH STEEL TO
ACCOMMODATE THE CITY OF BARDWELL STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BARDWELL
RELOCATION OF
FACILITIES OCTOBER
1640 080.62174 91
RELOCATE FACILITIES. INSTALL 170 FEET OF 2 INCH POLY ALONG FOXT STREET
AND ABANDON 213 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CALDWELL
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS CALDWELL
RELOCATION OF
FACILITIES OCTOBER
1641 080.62184 9
ABANDON DISTRICT REGULATOR STATION 11 IN MARLIN IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY SEPTEMBER
1642 080.62185 4
ABANDON DISTRICT REGULATOR STATION 02 AND 80 FEET OF 4 INCH STEEL AND
13 FEET OF 4 INCH POLY ALONG JEFFERSON SOUTH IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 52 of 178
271
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1643 080.62192 106
RELOCATE FACILITIES. INSTALL 150 FEET OF 6 INCH AND 25 FEET OF 2 INCH POLY
ALONG ALMENA ROAD AND ABANDON 150 FEET OF 6 INCH AND 20 FEET OF 2 INCH
STEEL TO ACCOMMODATE CITY OF RIVER OAKS STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS
RELOCATION OF
FACILITIES OCTOBER
1644 080.62202 537
RELOCATE FACILITIES. INSTALL 531 FEET OF 2 INCH POLY AND ABANDON 448
FEET OF 2 INCH STEEL ALONG ELIZABETH STEET TO ACCOMMODATE CITY OF
ROBINSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON
RELOCATION OF
FACILITIES OCTOBER
1645 080.62203 25
INSTALL 800 FEET OF 8 INCH POLY ALONG BRENTWOOD STAIR ROAD AND
ABANDON 800 FEET OF 16 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1646 080.62204 3,282
RELOCATE FACILITIES. INSTALL 2850 FEET OF 4 INCH AND 250 FEET OF 2 INCH
POLY ALONG DENISON STREET AND ABANDON 1863 FEET OF 3 INCH STEEL, 624
FEET OF 3 INCH, 44 FEET OF 2 INCH POLY, AND 100 FEET OF 4 INCH STEEL TO
ACCOMMODATE CITY OF ROBINSON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON
RELOCATION OF
FACILITIES OCTOBER
1647 080.62206 3,397
RELOCATE FACILITIES. INSTALL 1512 FEET OF 2 INCH, 1323 FEET OF 4 INCH POLY
AND ABANDON 2467 FEET OF 3 INCH STEEL AND 66 FEET OF 4 INCH POLY TO
ACCOMMODATE CITY OF ROBINSON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON
RELOCATION OF
FACILITIES OCTOBER
1648 080.62210 832
RELOCATE FACILITIES. INSTALL 492 FEET OF 2 INCH, 114 FEET OF 4 INCH POLY
AND ABANDON 492 FEET OF 2 INCH AND 92 FEET OF 4 INCH STEEL AND 5 FEET OF
2 INCH POLY ALONG PEGGY DRIVE TO ACCOMMODATE CITY OF ROBINSON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON
RELOCATION OF
FACILITIES OCTOBER
1649 080.62211 3,760
RELOCATE FACILITIES. INSTALL 1760 FEET OF 2 INCH POLY AND ABANDON 1744
FEET OF 2 INCH, 26 FEET OF 4 INCH STEEL ALONG LARRY STREET TO
ACCOMMODATE CITY OF HALTOM CITY STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY
RELOCATION OF
FACILITIES OCTOBER
1650 080.62212 2,822
RELOCATE FACILITIES. INSTALL 333 FEET OF 2 INCH, 1012 FEET OF 4 INCH POLY
AND ABANDON 417 FEET OF 2 INCH AND 992 FEET OF 3 INCH STEEL AND 4 FEET
OF 2 INCH POLY ALONG MONNA STREET TO ACCOMMODATE CITY OF HALTOM
CITY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY
RELOCATION OF
FACILITIES OCTOBER
1651 080.62213 60,394
RELOCATE FACILITIES. INSTALL 2157 FEET OF 6 INCH POLY AND ABANDON 2157
FEET OF 2 INCH STEEL ALONG KERLEY AND DUNCAN STREET TO ACCOMMODATE
CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1652 080.62218 226
RELOCATE FACILITIES. INSTALL 1654 FEET OF 4 INCH AND 806 FEET OF 2 INCH
POLY ALONG BREWSTER STREET AND ABANDON 2460 FEET OF 3 INCH STEEL TO
ACCOMMODATE CITY OF ROBINSON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON
RELOCATION OF
FACILITIES OCTOBER
1653 080.62219 958
INSTALL 540 FEET OF 2 INCH POLY AND ABANDON 734 FEET OF 2 INCH STEEL
ALONG AVENUE A TO ACCOMMODATE THE CITY OF CLIFTON IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON SYSTEM INTEGRITY OCTOBER
1654 080.62221 523
INSTALL DEEP WELL GROUND BED AND RECTIFIER AND ABANDON DEEP WELL
GROUND BED AND RECTIFIER ON LINE M IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MAYPEARL SYSTEM INTEGRITY OCTOBER
1655 080.62227 16,082
INSTALL 3000 FEET OF 4 INCH AND 3900 FEET OF 2 INCH POLY ALONG THE
STREETS OF LAVON FARMS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LAVON GROWTH OCTOBER
1656 080.62229 948
RELOCATE FACILITIES. INSTALL 223 FEET OF 6 INCH POLY ALONG OAK MILL
CREEK ROAD AND ABANDON 286 FEET OF 6 INCH POLY TO ACCOMMODATE CITY
OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1657 080.62236 2,060,760
FUNCTIONAL PROJECT TO REPLACE 5 FEET TO 250 FEET SECTIONS OF MAIN IN
SOUTHEAST DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1658 080.62276 634
INSTALL 800 FEET OF 2 INCH POLY AND ABANDON 618 FEET OF 2 INCH STEEL AND
88 FEET OF 2 INCH POLY ALONG CONGER STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUITMAN SYSTEM INTEGRITY OCTOBER
1659 080.62278 33,449
INSTALL 4058 FEET OF 2 INCH, 1926 FEET OF 4 INCH, 39 FEET OF 6 INCH, 746 FEET
OF 12 INCH POLY AND ABANDON 706 FEET OF 3 INCH POLY, 2916 FEET OF 3 INCH
AND 2062 FEET OF 6 INCH AND 1889 FEET OF 12 INCH STEEL ALONG BONHAM IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1660 080.62279 2,837
INSTALL 60 FEET OF 12 INCH STEEL ALONG ABRAMS ROAD AND ABANDON 60 FEET
OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1661 080.62280 2,069
INSTALL 1054 FEET OF 4 INCH POLY AND ABANDON 39 FEET OF 3 INCH AND 999
FEET OF 6 INCH STEEL ALONG MAPLELEAF IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1662 080.62283 53
INSTALL 175 FEET OF 4 INCH POLY ALONG CARL STREET AND ABANDON 175 FEET
OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
1663 080.62295 (173)
RELOCATE FACILITIES. INSTALL 1400 FEET OF 4 INCH POLY ALONG SUNSET
STREET AND ABANDON 525 FEET OF 2 INCH AND 8355 FEET OF 3 INCH STEEL TO
ACCOMMODATE CITY OF SULPHUR SPRINGS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS
RELOCATION OF
FACILITIES OCTOBER
1664 080.62297 3,497
RELOCATE FACILITIES. INSTALL 1568 FEET OF 4 INCH AND 4 FEET OF 6 INCH
POLY AND ABANDON 30 FEET OF 6 INCH POLY AND 53 FEET OF 3 INCH AND 102
FEET OF 6 INCH AND 1917 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF
DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
1665 080.62303 565
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION ALONG THE STREETS OF FORT WORTH IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1666 080.62309 3,379
INSTALL 11 FEET OF 2 INCH AND 1426 FEET OF 4 INCH POLY AND ABANDON 11
FEET OF 2 INCH POLY AND 1426 FEET OF 4 INCH STEEL ALONG FAIRBROOK
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER
1667 080.62310 22,082
INSTALL 225 FEET OF 4 INCH POLY, 2200 FEET OF 6 INCH IP POLY AND 550 FEET OF
8 INCH IP POLY ALONG LEON STREET, LEVITA, AND HIGHLAND. ABANDON 116 FEET
OF 2 INCH POLY, 1450 FEET OF 3 INCH STEEL AND 380 FEET OF 2 INCH IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE SYSTEM INTEGRITY OCTOBER
1668 080.62311 16,701
INSTALL 1769 FEET OF 8 INCH, 1217 FEET OF 4 INCH AND 5557 FEET OF 2 INCH
POLY ALONG THE STREETS OF WOLF RANCH WEST SECTION 4A. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH NOVEMBER
1669 080.62312 4,763
INSTALL 4010 FEET OF 4 INCH, 300 FEET OF 6 INCH POLY AND ABANDON 1042
FEET OF 2 INCH AND 1066 FEET OF 3 INCH AND 150 FEET OF 4 INCH STEEL AND
395 FEET OF 2 INCH AND 1948 FEET OF 3 INCH POLY ALONG MILL STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CUMBY SYSTEM INTEGRITY OCTOBER
1670 080.62313 28,747
RELOCATE FACILITIES. INSTALL 1120 FEET OF 4 INCH POLY AND ABANDON 670
FEET OF 4 INCH STEEL AND 280 FEET OF 4 INCH POLY ALONG MAIN STREET AND
AVENUE A IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 53 of 178
272
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1671 080.62315 5,509
RELOCATE FACILITIES. INSTALL 840 FEET OF 2 INCH POLY AND 174 FEET OF 4
INCH POLY AND ABANDON 700 FEET OF 2 INCH STEEL AND 54 FEET OF 2 INCH
POLY AND 148 FEET OF 4 INCH POLY ALONG DOROTHY TO ACCOMMODATE CITY
OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
RELOCATION OF
FACILITIES OCTOBER
1672 080.62328 59
INSTALL 425 FEET 2 INCH POLY ON PINE STREET AND ABANDON 672 FEET 3 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
1673 080.62333 1
ABANDON 489 FEET OF 2 INCH STEEL ALONG OFFUTT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
1674 080.62336 (7)
ABANDON DISTRICT REGULATOR STATION 8 IN TAYLOR COUNTY IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
1675 080.62338 13
INSTALL 508 FEET OF 4 INCH POLY ALONG 1ST STREET AND ABANDON 508 FEET
OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CHILLICOTHE SYSTEM INTEGRITY OCTOBER
1676 080.62339 (0)
ABANDON DISTRICT REGULATOR STATION 7 IN TOM GREEN COUNTY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY SEPTEMBER
1677 080.62341 (0)
ABANDON DISTRICT REGLUATOR STATION 49 IN TOM GREEN COUNTY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY SEPTEMBER
1678 080.62357 20,954
RELOCATE FACILITIES. INSTALL 422 FEET OF 2 INCH POLY AND 1141 FEET OF 4
INCH POLY AND 14 FEET OF 6 INCH POLY AND 2279 FEET OF 8 INCH POLY AND 175
FEET OF 12 INCH POLY AND ABANDON 147 FEET OF 2 INCH POLY AND 769 FEET
OF 4 INCH STEEL AND 1234 FEET OF 4 INCH POLY AND 2193 FEET OF 6 INCH STEEL
AND 753 FEET OF 6 INCH POLY AND 156 FEET OF 12 INCH STEEL ALONG CAMP
BOWIE BOULEVARD TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1679 080.62358 11,937
RELOCATE FACILITIES. ABANDON 150 FEET OF 2 INCH STEEL AND 301 FEET OF 2
INCH POLY AND 941 FEET OF 3 INCH STEEL AND 1364 FEET OF 3 INCH POLY AND
46 FEET OF 4 INCH POLY AND 2867 FEET OF 6 INCH POLY ALONG RM 620 TO
ACCOMMODATE CITY OF ROUND ROCK STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
RELOCATION OF
FACILITIES OCTOBER
1680 080.62359 1,380
INSTALL 257 FEET OF 2 INCH POLY AND ABANDON 416 FEET OF 2 INCH STEEL
AND 69 FEET OF 2 INCH POLY ALONG 16TH STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEMP SYSTEM INTEGRITY OCTOBER
1681 080.62366 7,430
INSTALL 1062 FEET OF 2 INCH POLY AND 3 FEET OF 3 INCH POLY AND ABANDON
74 FEET OF 2 INCH POLY AND 860 FEET OF 3 INCH STEEL AND 93 FEET OF 3 INCH
POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MALAKOFF SYSTEM INTEGRITY OCTOBER
1682 080.62376 130
INSTALL 1300 FEET OF 2 INCH POLY ALONG 21ST STREET AND ABANDON 800 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
1683 080.62380 3,175
RELOCATE FACILITIES. INSTALL 568 FEET OF 2 INCH AND 556 FEET OF 4 INCH
POLY AND ABANDON 375 FEET OF 2 INCH AND 1227 FEET OF 4 INCH AND 36 FEET
OF 6 INCH POLY TO ACCOMMODATE CITY OF WATAUGA STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WATAUGA
RELOCATION OF
FACILITIES OCTOBER
1684 080.62382 47
INSTALL 95 FEET OF 2 INCH 902 FEET OF 4 INCH AND 1305 FEET OF 6 INCH POLY
ALONG ENTERPRISE AND ABANDON 15 FEET OF 4 INCH POLY AND 2123 FEET OF 4
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER
1685 080.62383 2,084
INSTALL 2440 FEET OF 2 INCH AND 534 FEET OF 4 INCH POLY AND ABANDON 75
FEET OF 2 INCH AND 583 FEET OF 3 INCH AND 822 FEET OF 4 INCH STEEL AND 868
FEET OF 3 INCH AND 169 FEET OF 2 INCH AND 150 FEET OF 4 INCH POLY ALONG
7TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY OCTOBER
1686 080.62386 24
RELOCATE FACILITIES. INSTALL 175 FEET OF 2 INCH AND 740 FEET OF 4 INCH
POLY ALONG 8TH STREET AND ABANDON 915 FEET OF 3 INCH STEEL TO
ACCOMMODATE CITY OF VENUS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VENUS
RELOCATION OF
FACILITIES OCTOBER
1687 080.62387 8
INSTALL 625 FEET OF 2 INCH POLY ALONG 5TH STREET AND ABANDON 2520 FEET
OF 3 INCH STEEL AND 140 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VENUS SYSTEM INTEGRITY OCTOBER
1688 080.62391 6,600
INSTALL 110 FEET OF 16 INCH, 110FEET OF 12 INCH STEEL AND 90 FEET OF 8 INCH
POLY AND ABANDON 73 FEET OF 8 INCH POLY AND 93 FEET OF 12 INCH AND 60
FEET OF 16 INCH AND 34 FEET OF 18 INCH STEEL ALONG PETERSMITH IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1689 080.62397 2
INSTALL 6 FEET OF 4 INCH POLY ALONG ROSEWOOD AND ABANDON DISTRICT
REGULATOR STATION 3, 32 FEET OF 2 INCH AND 10 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
1690 080.62399 52,235
RELOCATE FACILITIES. INSTALL 792 FEET OF 4 INCH POLY AND ABANDON 275
FEET OF 2 INCH STEEL AND 533 FEET OF 2 INCH POLY AND 401 FEET OF 4 INCH
POLY ALONG SOUTH LOCUST DRIVE TO ACCOMMODATE CITY OF DENTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1691 080.62404 197
RELOCATE FACILITIES. INSTALL 425 FEET OF 4 INCH POLY ALONG SOUTH
PALESTINE AND ABANDON 425 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
ATHENS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
RELOCATION OF
FACILITIES OCTOBER
1692 080.62408 3
ABANDON DISTRICT REGULATOR STATION 01 IN HARDEMAN COUNTY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS CHILLICOTHE SYSTEM INTEGRITY OCTOBER
1693 080.62409 (0)
RELOCATE FACILITIES. ABANDON 55 FEET OF 6 INCH POLY ALONG 1700 SOUTH
JENNINGS AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1694 080.62419 423
INSTALL 5286 FEET OF 2 INCH POLY ALONG 3RD STREET AND ABANDON 2947 FEET
OF 4 INCH, 967 FEET OF 3 INCH STEEL, 1042 FEET OF 3 INCH, 335 FEET OF 2 INCH
AND 615 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ROSEBUD SYSTEM INTEGRITY OCTOBER
1695 080.62420 6,924
INSTALL 7982 FEET OF 2 INCH POLY AND ABANDON 66 FEET OF 1.25 INCH, 197
FEET OF 2 INCH, 3148 FEET OF 3 INCH POLY, 155 FEET OF 2 INCH, 4132 FEET OF 3
INCH, AND 27 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSEBUD SYSTEM INTEGRITY OCTOBER
1696 080.62422 31,736
RELOCATE FACILITIES. INSTALL 611 FEET OF 2 INCH POLY AND 364 FEET OF 4
INCH POLY AND 146 FEET OF 6 INCH POLY AND ABANDON 611 FEET OF 2 INCH
POLY AND 364 FEET OF 4 INCH POLY AND 146 FEET OF 6 INCH POLY ALONG
CALENDER ROAD TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
1697 080.62423 87,932
INSTALL 25500 FEET OF 10 INCH STEEL ALONG LINE KP1 AND ABANDON 19300
FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY DECEMBER
1698 080.62425 11,393
INSTALL 2455 FEET OF 2 INCH POLY ALONG WEST AVENUE EAST AND ABANDON
2580 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
1699 080.62439 2,106
INSTALL 1015 FEET OF 2 INCH POLY ALONG ALLEY OF COMANCHE TRAIL AND
ABANDON 1005 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
1700 080.62441 4,311
INSTALL 1190 FEET OF 2 INCH POLY AND 942 FEET OF 4 INCH POLY ALONG SOUTH
3RD STREET AND ABANDON 1140 FEET OF 2 INCH STEEL AND 1272 FEET OF 4
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
1701 080.62447 1,748
INSTALL POLY SERVICES AND ABANDON STEEL SERVICES ALONG THE
NORTHWEST DALLAS ZONE AREA IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 54 of 178
273
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1702 080.62448 16
RELOCATE FACILITIES. INSTALL 170 FEET OF 4 INCH POLY ALONG 3RD STREET
AND ABANDON 175 FEET OF 4 INCH POLY, 4 INCH, AND 3 INCH STEEL TO
ACCOMMODATE THE CITY OF TAYLOR STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR
RELOCATION OF
FACILITIES OCTOBER
1703 080.62457 373
INSTALL DISTRICT REGULATOR STATION IN ABILENE AND ABANDON DISTRICT
REGULATOR STATION 22 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
1704 080.62461 6,788
INSTALL 1955 FEET OF 6 INCH POLY AND 60 FEET OF 10 INCH STEEL ALONG
MONTE CARLO BOULEVARD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PRINCETON GROWTH MAY
1705 080.62492 4,034
INSTALL 1501 FEET OF 2 INCH POLY AND ABANDON 226 FEET OF 8 INCH STEEL
AND 1236 FEET OF 16 INCH STEEL ALONG EAST 6TH STREET AND IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER
1706 080.62513 2,063
RELOCATE FACILITIES. INSTALL 11 FEET OF 2 INCH POLY AND 4 FEET OF 3 INCH
POLY AND 1452 FEET OF 4 INCH POLY AND ABANDON 1096 FEET OF 2 INCH STEEL
AND 227 FEET OF 2 INCH POLY AND 110 FEET OF 3 INCH POLY ALONG YUCCA
DRIVE TO ACCOMMODATE CITY OF FLOWER MOUND STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
RELOCATION OF
FACILITIES OCTOBER
1707 080.62517 165
INSTALL 340 FEET OF 2 INCH, 6 FEET OF 3 INCH AND 47 FEET OF 4 INCH POLY AND
ABANDON 335 FEET OF 2 INCH, 40 FEET OF 4 INCH AND 6 FEET OF 3 INCH STEEL
ALONG THE STREETS OF WEST WHITE STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PILOT POINT SYSTEM INTEGRITY OCTOBER
1708 080.62523 23
INSTALL 800 FEET OF 2 INCH POLY ALONG WEST POINT AND ABANDON 800 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS COLORADO CITY SYSTEM INTEGRITY OCTOBER
1709 080.62527 20
INSTALL GROUNDBED AND RECTIFIER ALONG LINE L8AE1 AND ABANDON
GROUNDBED AND RECTIFIER IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GROESBECK SYSTEM INTEGRITY OCTOBER
1710 080.62553 95
INSTALL 1180 FEET OF 2 INCH POLY ALONG AUSTIN STREET AND ABANDON 932
FEET OF 4 INCH AND 432 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER
1711 080.62555 3,153
INSTALL 1170 FEET OF 6 INCH AND 130 FEET OF 2 INCH POLY ALONG CAMP BOWIE
AND ABANDON 1170 FEET OF 6 INCH AND 130 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1712 080.62571 3,236
INSTALL 7 FEET OF 2 INCH, 139 FEET OF 3 INCH AND 490 FEET OF 4 INCH STEEL
AND ABANDON 19 FEET OF 2 INCH, 104 FEET OF 3 INCH AND 482 FEET OF 4 INCH
STEEL ALONG CNG-56-T IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS EARLY SYSTEM INTEGRITY OCTOBER
1713 080.62590 (12)
INSTALL REGULATOR AND RELIEF VALVE AT KWIKSET REGULATOR STATION AND
ABANDON REGULATOR AND RELIEF VALVE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER
1714 080.62609 5,536
INSTALL 2966 FEET OF 2 INCH POLY AND ABANDON 2960 FEET OF 2 INCH POLY
AND 60 FEET OF 4 INCH STEEL ALONG ROUGH CREEK IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY OCTOBER
1715 080.62612 59
RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY ALONG HIGHWAY 283
AND ABANDON 99 FEET OF 3 INCH STEEL AND 99 FEET OF 3 INCH POLY TO
ACCOMMODATE TXDOT STREET PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY
RELOCATION OF
FACILITIES OCTOBER
1716 080.62613 37
RELOCATE FACILITIES. ABANDON 490 FEET OF 3 INCH POLY ALONG HIGHWAY 283
TO ACCOMMODATE CITY OF ALBANY STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY
RELOCATION OF
FACILITIES SEPTEMBER
1717 080.62630 1,683
RELOCATE FACILITIES. INSTALL 535 FEET OF 4 INCH POLY AND 210 FEET OF 6
INCH POLY AND ABANDON 132 FEET OF 6 INCH STEEL ALONG MARSHALL DRIVE
TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES OCTOBER
1718 080.62635 3
RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH POLY ALONG WICHITA
STREET AND ABANDON 200 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF
FOREST HILL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FOREST HILL
RELOCATION OF
FACILITIES OCTOBER
1719 080.62637 42
INSTALL DISTRICT REGULATOR STATION ALONG MAIN STREET AND ABANDON
DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY OCTOBER
1720 080.62639 17
INSTALL 400 FEET OF 4 INCH POLY ALONG FM1644 AND ABANDON 375 FEET OF 4
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALVERT SYSTEM INTEGRITY OCTOBER
1721 080.62641 188
INSTALL 900 FEET OF 2 INCH POLY ALONG HENSEL DRIVE AND ABANDON 880 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
1722 080.62657 3,342
INSTALL 1500 FEET OF 4 INCH AND 500 FEET OF 2 INCH POLY AND ABANDON 2000
FEET OF 1.25 INCH POLY ALONG SH 34 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AVALON SYSTEM INTEGRITY OCTOBER
1723 080.62688 24
ABANDON 320 FEET OF 2 INCH STEEL ALONG BRENTS STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1724 080.62689 9,841
RELOCATE FACILITIES. INSTALL 460 FEET OF 8 INCH AND 660 FEET OF 10 INCH
STEEL ALONG US HIGHWAY 75 AND ABANDON 460 FEET OF 8 INCH AND 660 FEET
OF 10 INCH STEEL TO ACCOMMODATE THE CITY OF SHERMAN IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
RELOCATION OF
FACILITIES OCTOBER
1725 080.62690 19
ABANDON 1247 FEET OF 2 INCH AND 476 FEET OF 1.25 INCH STEEL ALONG JAMES
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY SEPTEMBER
1726 080.62691 782
RELOCATE FACILITIES. INSTALL 1242 FEET OF 4 INCH POLY ALONG GRANDE
AVENUE AND ABANDON 904 FEET OF 2 INCH AND 338 FEET OF 4 INCH STEEL TO
ACCOMMODATE CITY OF CLEBURNE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
RELOCATION OF
FACILITIES OCTOBER
1727 080.62693 166,805
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY CLIFTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CLIFTON SYSTEM INTEGRITY OCTOBER
1728 080.62700 28,608
INSTALL 5605 FEET OF 2 INCH AND 909 FEET OF 6 INCH POLY ALONG THE STREETS
OF BAR W RANCH PHASE 1 SECTION 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH FEBRUARY
1729 080.62714 81,036
RELOCATE FACILITIES. INSTALL 1011 FEET OF 4 INCH AND 989 FEET OF 6 INCH
POLY ALONG FM 2818 AND ABANDON 238 FEET OF 4 INCH AND 500 FEET OF 6 INCH
POLY AND 219 FEET OF 4 INCH AND 728 FEET OF 6 INCH STEEL TO ACCOMMODATE
TXDOT HIGHWAY IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS
RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS COLLEGE STATION
RELOCATION OF
FACILITIES OCTOBER
1730 080.62716 4,544
RELOCATE FACILITIES. INSTALL 280 FEET OF 2 INCH POLY AND 160 FEET OF 4
INCH POLY ALONG WOODVILLE ROAD AND ABANDON 220 FEET OF 2 INCH AND 110
FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF BRYAN IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES OCTOBER
1731 080.62723 901
RELOCATE FACILITIES. INSTALL 345 FEET OF 2 INCH POLY AND ABANDON 30 FEET
OF 2 INCH POLY ALONG LLANO STREET TO ACCOMMODATE CITY OF
FREDERICKSBURG STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG
RELOCATION OF
FACILITIES OCTOBER
1732 080.62724 1,207
RELOCATE FACILITIES. INSTALL 1934 FEET OF 4 INCH POLY ALONG GRANDE
AVENUE AND ABANDON 1148 FEET OF 4 INCH AND 337 FEET OF 2 INCH STEEL TO
ACCOMMODATE CITY OF CLEBURNE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
RELOCATION OF
FACILITIES OCTOBER
1733 080.62726 6,030
RELOCATE FACILITIES. INSTALL 1875 FEET OF 2 INCH AND 1750 FEET OF 4 INCH
POLY AND ABANDON 1820 FEET OF 2 INCH, 490 FEET OF 4 INCH STEEL AND 55
FEET OF 2 INCH AND 1260 FEET OF 4 INCH POLY ALONG THOMASSON TO
ACCOMMODATE CITY OF MESQUITE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 55 of 178
274
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1734 080.62735 282,667
RELOCATE FACILITIES. INSTALL 478 FEET OF 2 INCH POLY AND 1810 FEET OF 4
INCH POLY ALONG SOUTH LOCUST STREET AND ABANDON 182 FEET OF 2 INCH
POLY AND 717 FEET OF 2 INCH STEEL AND 1158 FEET OF 6 INCH STEEL TO
ACCOMMODATE CITY OF DENTON STREET PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1735 080.62736 7,078
RELOCATE FACILITIES. INSTALL 1917 FEET OF 2 INCH POLY AND ABANDON 2211
FEET OF 2 INCH POLY AND 162 FEET OF 4 INCH POLY ALONG WAINWRIGHT
STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1736 080.62737 4,516
INSTALL 6 RELIEF VALVES AND RETIRE 6 RELIEF VALVES IN THE SOUTHWEST
SOUTH DISTRICT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS TAYLOR SYSTEM INTEGRITY OCTOBER
1737 080.62738 88,140
RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH, 809 FEET OF 4 INCH AND
2996 FEET OF 6 INCH POLY ALONG EAST ELM STREET AND ABANDON 781 FEET OF
3 INCH AND 470 FEET OF 4 INCH AND 1680 FEET OF 6 INCH STEEL AND 1380 FEET
OF 4 INCH AND 500 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF DENTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1738 080.62742 8,844
RELOCATE FACILITIES. INSTALL 823 FEET OF 2 INCH AND 3755 FEET OF 4 INCH
POLY AND ABANDON 495 FEET OF 2 INCH, 4269 FEET OF 4 INCH STEEL AND 119
FEET OF 4 INCH AND 260 FEET OF 2 INCH POLY ALONG THE STREETS OF
HANDLEY DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1739 080.62744 177
RELOCATE FACILITIES. INSTALL 267 FEET OF 2 INCH AND 5 FEET OF 3 INCH POLY
ALONG WHIPPOORWILL LANE AND ABANDON 226 FEET OF 3 INCH STEEL AND 8
FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1740 080.62752 252
INSTALL 150 FEET OF 8 INCH POLY ALONG HALL STREET AND ABANDON 150 FEET
OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1741 080.62753 23,510
INSTALL 36 FEET OF 4 INCH STEEL AND 7618 FEET OF 6 INCH STEEL AND
ABANDON 7353 FEET OF 4 INCH STEEL ALONG STREETS OF BROWNWOOD IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER
1742 080.62756 3
ABANDON DISTRICT REGULATOR STATION 26 IN ABILENE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
1743 080.62759 1,621
INSTALL (50) PAX1 MOTORIZED REGULATORS AND ABANDON (50) PAX1
MOTORIZED REGULATORS. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1744 080.62760 15
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY ALONG SKYLINE
STREET AND ABANDON 90 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
ROWLETT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT
RELOCATION OF
FACILITIES OCTOBER
1745 080.62763 (1)
INSTALL 329 FEET OF 2 INCH POLY ALONG AVENUE E AND ABANDON 329 FEET OF
3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER
1746 080.62765 34,915
RELOCATE FACILITIES. INSTALL 3100 FEET OF 6 INCH POLY ALONG CHEEK
SPARGER ROAD AND ABANDON 960 FEET OF 4 INCH POLY AND 1900 FEET OF 4
INCH STEEL TO ACCOMMODATE THE CITY OF COLLEYVILLE IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
RELOCATION OF
FACILITIES OCTOBER
1747 080.62778 50
INSTALL 850 FEET OF 6 INCH POLY ALONG HUFFINES AND ABANDON 650 FEET OF
6 INCH POLY AND 152 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY OCTOBER
1748 080.62791 461
RELOCATE FACILITIES. INSTALL 140 FEET OF 2 INCH POLY AND ABANDON 125
FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF EDGECLIFF VILLAGE STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS EDGECLIFF VILLAGE
RELOCATION OF
FACILITIES OCTOBER
1749 080.62802 2,165
INSTALL 4196 FEET OF 2 INCH POLY AND 3947 FEET OF 4 INCH POLY ALONG
ALONG THE STREETS OF GREENWAY PHASE 1. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL CELINA GROWTH SEPTEMBER
1750 080.62805 3,998
INSTALL 1340 FEET OF 4 INCH AND 75 FEET OF 2 INCH POLY ALONG WEST
HEMPHILL STREET AND ABANDON 1100 FEET OF 6 INCH STEEL 260 FEET OF 6 INCH
AND 60 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1751 080.62806 4,227
RELOCATE FACILITIES. INSTALL 1500 FEET OF 2 INCH AND 1200 FEET OF 4 INCH
POLY AND ABANDON 1500 FEET OF 2INCH AND 1200 FEET OF 4 INCH STEEL ALONG
HAWTHORNE TO ACCOMMODATE THE CITY OF PLANO ALLEY RECONDITIONING
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES OCTOBER
1752 080.62812 82
INSTALL 720 FEET OF 8 INCH AND 45 FEET OF 2 INCH POLY ALONG ROOSEVELT
AND ABANDON 720 FEET OF 8 INCH AND 45 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
1753 080.62819 2,293
RELOCATE FACILITIES. INSTALL 1087 FEET OF 2 INCH POLY AND ABANDON 203
FEET OF 2 INCH STEEL AND 73 FEET OF 2 INCH POLY AND 351 FEET OF 3 INCH
STEEL AND 738 FEET OF 3 INCH POLY ALONG NORTHWEST 2ND STREET TO
ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES OCTOBER
1754 080.62824 0
RELOCATE FACILITIES. ABANDON 35 FEET OF 4 INCH STEEL ALONG MILLER AVE
TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES SEPTEMBER
1755 080.62829 7,071
INSTALL 1750 FEET OF 8 INCH POLY AND ABANDON 1750 FEET OF 8 INCH STEEL
ALONG LEDBETTER DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1756 080.62833 6,012
INSTALL 240 FEET OF 12 INCH AND 75 FEET OF 4 INCH POLY ALONG E CLARENDON
DR AND ABANDON 210 FEET OF 12 INCH AND 25 FEET OF 10 INCH STEEL AND 50
FEET OF 4 INCH POLY AND 650 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1757 080.62834 942
RELOCATE FACILITIES. INSTALL 308 FEET OF 4 INCH POLY ALONG SOUTHWEST
PARKWAY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1758 080.62838 3,224
INSTALL 2501 FEET OF 2 INCH POLY AND ABANDON 2485 FEET OF 2 INCH STEEL
ALONG SATURN SPRINGS DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
1759 080.62842 3,625
INSTALL 28 FEET OF 2 INCH, 71 FEET OF 4 INCH AND 1597 FEET OF 6 INCH POLY
AND ABANDON 1650 FEET OF 6 INCH STEEL AND 125 FEET OF 6 INCH POLY ALONG
CHERRY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER
1760 080.62845 6,269
INSTALL 275 FEET OF 4 INCH POLY AND 1622 FEET OF 6 INCH POLY AND ABANDON
100 FEET OF 3 INCH STEEL AND 1829 FEET OF 6 INCH STEEL ALONG BRUTON
ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1761 080.62850 11,182
RELOCATE FACILITIES. INSTALL 750 FEET OF 4 INCH POLY AND ABANDON 650
FEET OF 3 INCH POLY AND 100 FEET OF 4 INCH STEEL ALONG KROGER DRIVE TO
ACCOMODATECITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1762 080.62866 16
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY ALONG 9TH STREET
AND ABANDON 100 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF WACO
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 56 of 178
275
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1763 080.62870 1,912
INSTALL 1530 FEET OF 4 INCH AND 220 FEET OF 4 INCH POLY AND ABANDON 730
FEET OF 4 INCH, 471 FEET OF 3 INCH, 160 FEET OF 2 INCH STEEL AND 60 FEET OF
2 INCH POLY ALONG WOODLAWN STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER
1764 080.62878 27,424
INSTALL 1020 FEET OF 2 INCH POLY ALONG LAKESIDE DRIVE AND ABANDON 1010
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
1765 080.62890 1,349
INSTALL 398 FEET OF 2 INCH POLY AND 700 FEET OF 4 INCH POLY AND ABANDON
496 FEET OF 2 INCH STEEL AND 28 FEET OF 2 INCH POLY AND 672 FEET OF 4 INCH
STEEL ALONG LOOP 286 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER
1766 080.62893 33
RELOCATE FACILITIES. INSTALL 325 FEET FEET OF 4 INCH POLY ALONG HIGH
SCHOOL DRIVE STREET AND ABANDON 325 FEET OF 4 INCH POLY TO
ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
RELOCATION OF
FACILITIES OCTOBER
1767 080.62904 122
INSTALL 382 FEET OF 4 INCH POLY ALONG AVENUE B AND ABANDON 382 FEET OF
3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER
1768 080.62917 1,545
RELOCATE FACILITIES. INSTALL 1376 FEET OF 2 INCH POLY AND 3 FEET OF 3 INCH
POLY AND ABANDON 111 FEET OF 2 INCH POLY AND 1194 FEET OF 3 INCH
STEELALONG 17TH STREET TO ACCOMMODATE CITY OF PARIS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS PARIS
RELOCATION OF
FACILITIES OCTOBER
1769 080.62930 4
ABANDON 348 FEET OF 2 INCH POLY ALONG STREETS OF FORT WORTH IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1770 080.62950 9,900
INSTALL 200 FEET OF 20 INCH STEEL ALONG BELTLINE AND ABANDON 190 FEET
OF 20 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS SUNNYVALE SYSTEM INTEGRITY OCTOBER
1771 080.62952 192
RELOCATE FACILITIES. INSTALL 1100 FEET OF 2 INCH POLY ALONG WEST FRONT
AND ABANDON 1090 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
RELOCATION OF
FACILITIES OCTOBER
1772 080.62956 40,784
INSTALL 2600 FEET OF 12 INCH AND 6250 FEET OF 2 INCH POLY ALONG
NORTHWEST HIGHWAY AND ABANDON 260 FEET OF 12 INCH, 5540 FEET OF 6 INCH,
3335 FEET OF 2 INCH, 105 FEET OF 3 INCH STEEL, 525 FEET OF 6 INCH, 1050 FEET
OF 1.25 INCH, 2655 FEET OF 2 INCH, 875 FEET OF 3 INCH AND 295 FEET OF 6 INCH
POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1773 080.62957 766
INSTALL 802 FEET OF 2 INCH POLY AND ABANDON 791 FEET OF 2 INCH STEEL
ALONG BLANTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CHICO SYSTEM INTEGRITY OCTOBER
1774 080.62962 499
INSTALL 548 FEET OF 2 INCH POLY AND ABANDON 313 FEET OF 2 INCH STEEL
AND 461 FEET OF 3 INCH STEEL ALONG BUTLER STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY OCTOBER
1775 080.62980 5,111
INSTALL DISTRICT REGULATOR STATION AND 158 FEET OF 6 INCH POLY, 15 FEET
OF 6 INCH AND 41 FEET OF 8 INCH STEEL AND ABANDON 3 DISTRICT REGULATOR
STATION AND 36 FEET OF 2 INCH AND 142 FEET OF 4 INCH STEEL ALONG THE
STREETS OF BURLESON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY OCTOBER
1776 080.62991 169
RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH POLY ALONG CHERRYWOOD
COURT AND ABANDON 350 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
1777 080.63002 572
RELOCATE FACILITIES. INSTALL 480 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY
ALONG SHADY OAK ROAD AND ABANDON 480 FEET OF 4 INCH STEEL AND 10 FEET
OF 2 INCH POLY TO ACCOMMODATE CITY OF KEENE STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEENE
RELOCATION OF
FACILITIES OCTOBER
1778 080.63010 222
RELOCATE FACILITIES. INSTALL 25 FEET OF 2 INCH POLY AND 14 FEET OF 6 INCH
POLY AND ABANDON 10 FEET OF 2 INCH POLY AND 9 FEET OF 6 INCH POLY ALONG
YALE BOULEVARD TO ACCOMMODATE CITY OF RICHARDSON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
RELOCATION OF
FACILITIES OCTOBER
1779 080.63011 242
INSTALL DISTRICT REGULATOR STATION ALONG HARRISON STREET AND
ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELLMEAD SYSTEM INTEGRITY OCTOBER
1780 080.63015 22
INSTALL 340 FEET OF 2 INCH POLY ALONG EMMETT STREET AND ABANDON 335
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
1781 080.63016 5,987
INSTALL 4634 FEET OF 2 INCH AND 595 FEET OF 4 INCH POLY AND ABANDON 1993
FEET OF 4 INCH STEEL AND 160 FEET OF 3 INCH AND 1830 FEET OF 4 INCH POLY
ALONG HUBBARD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER
1782 080.63028 1,729
RELOCATE FACILITIES. INSTALL 795 FEET OF 2 INCH POLY ALONG TRIUMPH AND
ABANDON 795 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FOREST HILL
WATER LINE PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FOREST HILL
RELOCATION OF
FACILITIES OCTOBER
1783 080.63033 1,061
RELOCATE FACILITIES. INSTALL 761 FEET OF 4 INCH POLY ALONG OAKMONT AND
ABANDON 620 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF ROUND ROCK IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
RELOCATION OF
FACILITIES OCTOBER
1784 080.63038 (5,357)
INSTALL CP TEST STATION AND REMOTE MONITORING UNIT ALONG SUMMER
CREEK DRIVE. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY APRIL
1785 080.63043 2,324
INSTALL 2000 FEET OF 2 INCH POLY ALONG BLOSSOM AND ABANDON 1980 FEET
OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF GARLAND IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
1786 080.63045 82
INSTALL 360 FEET OF 4 INCH POLY ALONG N AVENUE AND ABANDON 360 FEET OF
4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS OLNEY SYSTEM INTEGRITY OCTOBER
1787 080.63048 536
INSTALL 672 FEET OF 2 INCH POLY AND ABANDON 739 FEET OF 4 INCH STEEL
AND 674 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY OCTOBER
1788 080.63049 2,703
INSTALL 4 FEET OF 4 INCH POLY AND 416 FEET OF 6 INCH POLY AND ABANDON
396 FEET OF 3 INCH STEEL AND 4 FEET OF 4 INCH POLY ALONG FM HWY 121 AND
3RD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GUNTER SYSTEM INTEGRITY OCTOBER
1789 080.63053 5
RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG HILLSDALE
DRIVE AND ABANDON 80 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF
FLOWERMOUND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
RELOCATION OF
FACILITIES OCTOBER
1790 080.63065 963
RELOCATE FACILITIES. INSTALL 567 FEET OF 2 INCH POLY AND ABANDON 642
FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF HALTOM CITY STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY
RELOCATION OF
FACILITIES OCTOBER
1791 080.63069 5,857
RELOCATE FACILITIES. INSTALL 616 FEET OF 2 INCH POLY AND 258 FEET OF 4
INCH POLY AND 698 FEET OF 6 INCH POLY AND ABANDON 888 FEET OF 2 INCH
STEEL AND 90 FEET OF 2 INCH POLY AND 61 FEET OF 3 INCH STEEL AND 525 FEET
OF 4 INCH STEEL TO ACCOMMODATE CITY OF KAUFMAN STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN
RELOCATION OF
FACILITIES OCTOBER
1792 080.63080 6,350
INSTALL 1035 FEET OF 8 INCH STEEL ALONG CHRISTOVAL ROAD AND ABANDON
1035 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
1793 080.63090 251
RELOCATE FACILITIES. INSTALL 270 FEET OF 2 INCH POLY ALONG 823 FLAMINGO
AND ABANDON 260 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF
DUNCANVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DUNCANVILLE
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 57 of 178
276
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1794 080.63091 1,837
INSTALL 1000 FEET OF 2 INCH POLY AND ABANDON 999 FEET OF 3 INCH STEEL
ALONG AUSTIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS LEONARD SYSTEM INTEGRITY OCTOBER
1795 080.63092 239
INSTALL 359 FEET OF 2 INCH POLY AND ABANDON 479 FEET OF 2 INCH STEEL
ALONG WEST WILLIAM IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
1796 080.63097 5,541
INSTALL 4330 FEET OF 2 INCH POLY ALONG THE STREETS OF THE FIFTH PHASE OF
THE AVERY POINTE SUBDIVISION. RESIDENTIAL ANNA GROWTH SEPTEMBER
1797 080.63100 4
ABANDON DISTRICT REGULATOR 1 IN ALBANY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY SYSTEM INTEGRITY SEPTEMBER
1798 080.63109 33
ABANDON 387 FEET OF 4 INCH CAST IRON ALONG 7TH STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
1799 080.63112 269
RELOCATE FACILITIES. INSTALL 24 FEET OF 6 INCH POLY ALONG JOHN W. ELLIOTT
STREET AND ABANDON 24 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF
FRISCO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FRISCO
RELOCATION OF
FACILITIES OCTOBER
1800 080.63113 3,647
RELOCATE FACILITIES. INSTALL 20 FEET OF 2 INCH POLY AND 1430 FEET OF 6
INCH POLY AND ABANDON 18 FEET OF 2 INCH POLY AND 1405 FEET OF 6 INCH
POLY TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES OCTOBER
1801 080.63135 132,233
RELOCATE FACILITIES. INSTALL 4109 FEET OF 2 INCH POLY AND 31 FEET OF 3
INCH POLY AND 182 FEET OF 4 INCH POLY AND 3695 FEET OF 6 INCH POLY AND
ABANDON 522 FEET OF 1.25 INCH POLY AND 368 FEET OF 2 INCH STEEL AND 1610
FEET OF 2 INCH POLY AND 1649 FEET OF 3 INCH STEEL AND 1934 FEET OF 3 INCH
POLY AND 70 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG MAIN
AND CIRCLE TO ACCOMMODATE CITY OF KAUFMAN STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN
RELOCATION OF
FACILITIES OCTOBER
1802 080.63150 205,960
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY VERNON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER
1803 080.63155 35,676 IOWA PARK AREA REPLACEMENTS AS PART OF THE TEXAS RULE 8.209 PROGRAM. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
1804 080.63156 687
RELOCATE FACILITIES. INSTALL 440 FEET OF 6 INCH POLY ALONG WEST BELTLINE
ROAD AND ABANDON 440 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF
DESOTO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DESOTO
RELOCATION OF
FACILITIES OCTOBER
1805 080.63159 343
INSTALL 40 FEET OF 12 INCH STEEL ALONG SH 199 AND ABANDON 40 FEET OF 12
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AZLE SYSTEM INTEGRITY OCTOBER
1806 080.63162 1,161
RELOCATE FACILITIES. INSTALL 1320 FEET OF 4 INCH POLY AND ABANDON 639
FEET OF 4 INCH STEEL AND 46 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF
SHERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
RELOCATION OF
FACILITIES OCTOBER
1807 080.63163 1,183
RELOCATE FACILITIES. INSTALL 408 FEET OF 4 INCH POLY AND ABANDON 351
FEET OF 4 INCH STEEL AND 20 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1808 080.63164 1,467
RELOCATE FACILITIES. INSTALL 321 FEET OF 2 INCH POLY AND 350 FEET OF 4
INCH POLY AND ABANDON 110 FEET OF 2 INCH STEEL AND 79 FEET OF 2 INCH
POLY AND 316 FEET OF 3 INCH STEEL AND 17 FEET OF 4 INCH POLY TO
ACCOMMODATE CITY OF WACO HERRING AVE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
1809 080.63170 2
RELOCATE FACILITIES. ABANDON 123 FEET OF 3 INCH POLY ALONG GRAND
AVENUE PARKWAY TO ACCOMMODATE THE CITY OF AUSTIN STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS AUSTIN
RELOCATION OF
FACILITIES SEPTEMBER
1810 080.63172 1,743
INSTALL DISTRICT REGULATOR STATION 01 ALONG PINE STREET AND ABANDON
DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ABBOTT SYSTEM INTEGRITY OCTOBER
1811 080.63177 886
RELOCATE FACILITIES. INSTALL 320 FEET OF 2 INCH POLY ALOG MESQUITE DRIVE
AND ABANDON 127 FEET OF 2 INCH STEEL AND 188 FEET OF 2 INCH POLY TO
ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
RELOCATION OF
FACILITIES OCTOBER
1812 080.63180 2,530
INSTALL 1788 FEET OF 4 INCH POLY AND ABANDON 1749 FEET OF 3 INCH STEEL
AND 36 FEET OF 2 INCH POLY ALONG AVENUE B IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS LAWN SYSTEM INTEGRITY OCTOBER
1813 080.63191 2,976
INSTALL 25 FEET OF 10 INCH AND 10 FEET OF 8 INCH STEEL ALONG TEASLEY
DRIVE AND ABANDON 25 FEET OF 10 INCH AND 10 FEET OF 8 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER
1814 080.63196 53
RELOCATE FACILITIES. INSTALL 55 FEET OF 2 INCH POLY AND ABANDON 36 FEET
OF 2 INCH POLY ALONG WESTVIEW TO ACCOMMODATE CITY OF ROWLETT STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT
RELOCATION OF
FACILITIES OCTOBER
1815 080.63198 910
INSTALL 21 FEET OF 2 INCH POLY AND 328 FEET OF 4 INCH POLY AND ABANDON 2
FEET OF 2 INCH STEEL AND 289 FEET OF 4 INCH STEEL AND 34 FEET OF 4 INCH
POLY ALONG TRINTIY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY OCTOBER
1816 080.63206 1,010
INSTALL 625 FEET OF 2 INCH POLY AND ABANDON 1967 FEET OF 2 INCH STEEL
AND 128 FEET OF 2 INCH POLY ALONG PINE STREET IN CLYDE IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS CLYDE SYSTEM INTEGRITY OCTOBER
1817 080.63207 2,365
INSTALL 420 FEET OF 4 INCH POLY AND 760 FEET OF 2 INCH POLY ALONG US
HIGHWAY 377. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL GRANBURY GROWTH SEPTEMBER
1818 080.63212 8,136
INSTALL 5 FEET OF 12 INCH STEEL AND 14 FEET OF 16 INCH STEEL AND ABANDON
19 FEET OF 12 INCH STEEL AND 18 FEET OF 16 INCH STEEL ALONG DAGGETT
AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1819 080.63213 11,279
INSTALL 5 FEET OF 4 INCH POLY AND 7 FEET OF 6 INCH POLY AND 25 FEET OF 8
INCH POLY AND 983 FEET OF 12 INCH POLY ALONG LANCASTER ROAD AND
ABANDON 440 FEET OF 6 INCH STEEL AND 7 FEET OF 6 INCH POLY AND 1127 FEET
OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1820 080.63216 123,925
RELOCATE FACILITIES. INSTALL 455 FEET OF 2 INCH POLY AND 2292 FEET OF 4
INCH POLY AND ABANDON 465 FEET OF 2 INCH STEEL, 257 FEET OF 4 INCH STEEL
AND 619 FEET OF 4 INCH POLY TO ACCOMMODATE TXDOT RELOCATION PROJECT
IN ACCORDANCE WITH TEXAS RULE 8.209. ALL CUSTOMERS SPRINGTOWN
RELOCATION OF
FACILITIES OCTOBER
1821 080.63217 807
INSTALL 797 FEET OF 2 INCH POLY AND ABANDON 388 FEET OF 2 INCH STEEL AND
182 FEET OF 2 INCH POLY ALONG AVENUE P IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON SYSTEM INTEGRITY OCTOBER
1822 080.63222 3,647
RELOCATE FACILITIES. INSTALL 1337 FEET OF 2 INCH POLY AND 245 FEET OF 4
INCH POLY AND ABANDON 1575 FEET OF 2 INCH STEEL ALONG SCRIPTURE
STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1823 080.63232 1,925
INSTALL 104 FEET OF 2 INCH POLY AND 354 FEET OF 4 INCH POLY AND 1500 FEET
OF 6 INCH POLY ALONG SPRUCE AVENUE AND ABANDON 1958 FEET OF 4 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE SYSTEM INTEGRITY OCTOBER
1824 080.63236 1,557
RELOCATE FACILITIES. INSTALL 672 FEET F 4 INCH POLY ALONG BELL AND
ABANDON 8 FEET OF 2 INCH POLY AND 592 FEET OF 4 INCH POLY AND 75 FEET OF
6 INCH POLY TO ACCOMMODATE CITY OF SAN ANGELO STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 58 of 178
277
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1825 080.63240 119
RELOCATE FACILITIES. INSTALL 10 FEET OF 3 INCH POLY AND ABANDON 5 FEET
OF 3 INCH POLY ALONG MCDANIEL TO ACCOMMODATE CITY OF CARROLLTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON
RELOCATION OF
FACILITIES OCTOBER
1826 080.63241 1,906
INSTALL 2760 FEET OF 4 INCH POLY AND ABANDON 1958 FEET OF 4 INCH STEEL
ALONG WALNUT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE SYSTEM INTEGRITY OCTOBER
1827 080.63242 2,040
RELOCATE FACILITIES. INSTALL 940 FEET OF 4 INCH POLY ALONG WYNNEWOOD
DRIVE AND ABANDON 335 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF
DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
1828 080.63251 17,062
RELOCATE FACILITIES. INSTALL 495 FEET OF 2 INCH POLY AND 172 FEET OF 4
INCH POLY AND 1079 FEET OF 6 INCH POLY AND ABANDON 679 FEET OF 2 INCH
STEEL AND 875 FEET OF 4 INCH STEEL AND 136 FEET OF 6 INCH POLY ALONG
MAIN STREET TO ACCOMMODATE CITY OF CROWLEY STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY
RELOCATION OF
FACILITIES OCTOBER
1829 080.63255 11
ABANDON DISTRICT REGULATOR STATION 132 ALONG WEST COLORADO IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1830 080.63256 1,544
RELOCATE FACILITIES. INSTALL (33) POLY SERVICES AND ABANDON (33) STEEL
SERVICES ALONG MILDRED LANE TO ACCOMMODATE CITY OF BENBROOK STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK
RELOCATION OF
FACILITIES OCTOBER
1831 080.63257 5
ABANDON DISTRICT REGULATOR STATION 10 IN COMANCHE IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY SEPTEMBER
1832 080.63271 1,515
INSTALL 3 FEET OF 2 INCH POLY AND 1426 FEET OF 4 INCH POLY AND ABANDON
426 FEET OF 2 INCH POLY AND 1581 FEET OF 4 INCH STEEL AND 382 FEET OF 4
INCH POLY ALONG BOWIE STREET IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS SANTA ANNA SYSTEM INTEGRITY OCTOBER
1833 080.63279 3,835
INSTALL 544 FEET OF 2 INCH POLY AND 9 FEET OF 3 INCH POLY AND 30 FEET OF 4
INCH POLY AND 1451 FEET OF 6 INCH POLY ALONG BROADWAY STREET AND
ABANDON 1376 FEET OF 3 INCH STEEL AND 10 FEET OF 4 INCH STEEL AND 779
FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER
1834 080.63284 6,156
INSTALL 2930 FEET OF 4 INCH POLY ALONG EAST TEXAS AVENUE AND ABANDON
800 FEET OF 3 INCH AND 1950 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER
1835 080.63298 3,808
RELOCATE FACILITIES. INSTALL 420 FEET OF 8 INCH POLY ALONG LAMAR AND
ABANDON 415 FEET OF 8 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
1836 080.63300 876
INSTALL 880 FEET OF 4 INCH POLY ALONG NORTH BECKLEY AND ABANDON 878
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY OCTOBER
1837 080.63309 30,412
INSTALL 791 FEET OF 8 INCH, 1632 FEET OF 6 INCH, 314 FEET OF 4 INCH AND 3492
FEET OF 2 INCH POLY ALONG THE STREETS OF BAR W RANCH PHASE 1 SECTION
2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH FEBRUARY
1838 080.63312 14,486
INSTALL POLY SERVICES AND ABANDON STEEL SERVICES ALONG STREETS IN
CITY OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1839 080.63321 1,636
RELOCATE FACILITIES. INSTALL 1120 FEET OF 4 INCH POLY ALONG ROYAL STREET
ABANDON 1000 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF
WAXAHACHIE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WAXAHACHIE
RELOCATION OF
FACILITIES OCTOBER
1840 080.63326 13,129
RELOCATE FACILITIES. INSTALL 93 FEET OF 2 INCH POLY AND 260 FEET OF 4 INCH
POLY AND 4967 FEET OF 8 INCH POLY AND ABANDON 93 FEET OF 2 INCH POLY
AND 146 FEET OF 4 INCH POLY AND 4734 FEET OF 8 INCH POLY ALONG SKYLINE
AND SH80 TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
RELOCATION OF
FACILITIES OCTOBER
1841 080.63331 11,073
INSTALL 4500 FEET OF 4 INCH AND 2100 FEET OF 2 INCH POLY ALONG MARKET
STREET AND ABANDON 2 FEET OF 2 INCH STEEL AND 249 FEET OF 2 INCH POLY
AND 3210 FEET OF 3 INCH STEEL AND 188 FEET OF 3 INCH POLY AND 2289 FEET OF
4 INCH STEEL AND 572 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MABANK SYSTEM INTEGRITY OCTOBER
1842 080.63336 2,315
RELOCATE FACILITIES. INSTALL 600 FEET OF 4 INCH POLY ALONG HUNT AND
PECAN AND ABANDON 540 FEET OF 6 INCH STEEL AND 60 FEET OF 4 INCH STEEL
TO ACCOMMODATE THE CITY OF RANGER IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER
RELOCATION OF
FACILITIES OCTOBER
1843 080.63337 4,615
INSTALL 291 FEET OF 2 INCH POLY AND 2331 FEET OF 4 INCH POLY AND 738 FEET
OF 6 INCH POLY AND 8 FEET OF 12 INCH STEEL AND ABANDON 384 FEET OF 2
INCH STEEL AND 181 FEET OF 2 INCH POLY AND 587 FEET OF 4 INCH STEEL AND
2569 FEET OF 6 INCH STEEL AND 17 FEET OF 6 INCH POLY AND 370 FEET OF 8
INCH STEEL AND 8 FEET OF 12 INCH STEEL ALONG BRIDWELL STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
1844 080.63352 2,783
INSTALL 1057 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK
PHASE 6. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
1845 080.63363 499
RELOCATE FACILITIES. INSTALL 510 FEET OF 4 INCH POLY ALONG OLD AUSTIN
PFLUGERVILLE ROAD AND ABANDON 517 FEET OF 3 INCH AND 59 FEET OF 2 INCH
POLY TO ACCOMMODATE THE CITY OF PFLUGERVILLE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PFLUGERVILLE
RELOCATION OF
FACILITIES OCTOBER
1846 080.63368 41
RELOCATE FACILITIES. INSTALL 68 FEET OF 2 INCH POLY ALONG VALLEY DRIVE
AND ABANDON 62 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF
KERRVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS KERRVILLE
RELOCATION OF
FACILITIES OCTOBER
1847 080.63379 19,203
RELOCATE FACILITIES. INSTALL 796 FEET OF 6 INCH POLY AND ABANDON 677
FEET OF 4 INCH POLY AND 257 FEET OF 6 INCH POLY ALONG MCDONWELL
SCHOOL ROAD TO ACCOMMODATE CITY OF COLLEYVILLE STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
RELOCATION OF
FACILITIES OCTOBER
1848 080.63381 5,916
INSTALL 2000 FEET OF 2 INCH AND 324 FEET OF 4 INCH POLY ALONG GARTH AND
ABANDON 1757 FEET OF 2 INCH STEEL AND 303 FEET OF 3 INCH STEEL AND 324
FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS KILLEEN SYSTEM INTEGRITY OCTOBER
1849 080.63389 1,353
INSTALL 740 FEET OF 2 INCH POLY ALONG CLARE STREET AND ABANDON 1500
FEET OF 2 INCH OTHER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
1850 080.63394 1,025
RELOCATE FACILITIES. INSTALL 975 FEET OF 2 INCH POLY ALONG SHORECREST
DRIVE AND ABANDON 965 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF
ROWLETT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ROWLETT
RELOCATION OF
FACILITIES OCTOBER
1851 080.63398 545
INSTALL 920 FEET OF 2 INCH POLY ALONG EAST ELLISON STREET AND ABANDON
650 FEET OF 4 INCH STEEL AND 275 FEET OF 4 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY OCTOBER
1852 080.63404 470
INSTALL DISTRICT REGULATOR STATION IN BROOKSTON AND ABANDON DISTRICT
REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BROOKSTON SYSTEM INTEGRITY OCTOBER
1853 080.63408 406
RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH AND 250 FEET OF 2 INCH
POLY ALONG BUFFORD STREET ABANDON 250 FEET OF 2 INCH POLY AND 175
FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF BURLESON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BURLESON
RELOCATION OF
FACILITIES OCTOBER
1854 080.63414 5,750
RELOCATE FACILITIES. INSTALL 645 FEET OF 2 INCH POLY ALONG MICHIGAN
AVENUE AND ABANDON 1000 FEET OF 6 INCH CAST IRON TO ACCOMMODATE CITY
OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 59 of 178
278
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1855 080.63428 2,061
RELOCATE FACILITIES. INSTALL 1540 FEET OF 2 INCH POLY ALONG WESTWOOD
DRIVE AND ABANDON 1540 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY
OF IRVING IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
1856 080.63443 145,572
RELOCATE FACILITIES. INSTALL 114 FEET OF 2 INCH, 905 FEET OF 4 INCH AND
4619 FEET OF 6 INCH POLY AND ABANDON 48 FEET OF 2 INCH STEEL AND 38 FEET
OF 3 INCH STEEL AND 5346 FEET OF 4 INCH STEEL AND 244 FEET OF 4 INCH POLY
ALONG SOUTH COLLINS STREET AND PIONEER PARKWAY.TO ACCOMMODATE
CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
1857 080.63457 1,155
RELOCATE FACILITIES. INSTALL 193 FEET OF 6 INCH POLY ALONG WEST DIVISION
AND ABANDON 156 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF
ARLINGTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
1858 080.63472 447
RELOCATE FACILITIES. INSTALL 440 FEET OF 2 INCH POLY ALONG JARVIS WAY
AND ABANDON 440 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1859 080.63476 40
ABANDON DISTRICT REGULATOR STATION 08 ALONG DAVIS STREET IN WEST,
TEXAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST SYSTEM INTEGRITY OCTOBER
1860 080.63477 0
ABANDON DISTRICT REGULATOR STATION 10 IN ALBANY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ALBANY SYSTEM INTEGRITY SEPTEMBER
1861 080.63479 617
ABANDON DISTRICT REGULATOR STATION 19 ALONG CHAMBERS IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY OCTOBER
1862 080.63487 6,407
INSTALL 96 FEET OF 18 INCH STEEL AND ABANDON 96 FEET OF 18 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1863 080.63492 824
RELOCATE FACILITIES. INSTALL 411 FEET OF 4 INCH POLY AND ABANDON 20 FEET
OF 4 INCH POLY AND 395 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1864 080.63493 374
ABANDON 176 FEET OF 2 INCH POLY AND 244 FEET OF 4 INCH POLY ALONG
OVILLA ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS RED OAK SYSTEM INTEGRITY OCTOBER
1865 080.63495 4,261
RELOCATE FACILITIES. INSTALL 2786 FEET OF 2 INCH POLY AND ABANDON 1460
FEET OF 2 INCH STEEL AND 5 FEET OF 3 INCH STEEL ALONG OLIVE PLACE TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1866 080.63496 867
INSTALL 627 FEET OF 2 INCH POLY AND ABANDON 620 FEET OF 2 INCH STEEL
ALONG HILLTOP DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY OCTOBER
1867 080.63503 4,465
INSTALL 53 FEET OF 2 INCH POLY AND 2400 FEET OF 4 INCH POLY AND 315 FEET
OF 6 INCH POLY AND ABANDON 54 FEET OF 2 INCH POLY AND 2398 FEET OF 4
INCH POLY AND 310 FEET OF 6 INCH STEEL ALONG JAMESTOWN LANE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER
1868 080.63507 (2)
ABANDON DISTRICT REGULATOR STATION 262 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1869 080.63512 17,680
INSTALL 2041 FEET OF 2 INCH POLY AND 880 FEET OF 4 INCH POLY AND 1287
FEET OF 6 INCH POLY AND ABANDON 2354 FEET OF 3 INCH STEEL AND 677 FEET
OF 4 INCH STEEL AND 432 FEET OF 6 INCH STEEL ALONG WEST 28TH STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
1870 080.63514 2,015
INSTALL 1600 FEET OF 2 INCH POLY ALONG TRAVIS AVENUE AND ABANDON 1570
FEET OF 4 INCH STEEL AND 380 FEET OF 4 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1871 080.63517 79
INSTALL RELIEF VALVE AND ABANDON RELIEF VALVE ALONG DISTRICT
REGULATOR 1 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS MOODY SYSTEM INTEGRITY OCTOBER
1872 080.63519 1,126
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY AND ABANDON 500
FEET OF 2 INCH STEEL AND 20 FEET OF 2 INCH POLY ALONG HOLLAND STREET TO
ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES OCTOBER
1873 080.63525 (37)
ABANDON DISTRICT REGULATOR STATION 274 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1874 080.63531 1,025
INSTALL 301 FEET OF 4 INCH POLY AND 80 FEET OF 8 INCH STEEL AND 60 FEET OF
2 INCH POLY ALONG HOUSTON AND ABANDON 290 FEET OF 4 INCH AND 50 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ROYSE CITY SYSTEM INTEGRITY OCTOBER
1875 080.63533 7,527
RELOCATE FACILITIES. INSTALL 57 FEET OF 2 INCH POLY AND 2811 FEET OF 4
INCH POLY AND ABANDON 1695 FEET OF 2 INCH STEEL AND 46 FEET OF 2 INCH
POLY AND 1120 FEET OF 4 INCH STEEL AND 5 FEET OF 4 INCH POLY ALONG TEXT
BOULEVARD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1876 080.63544 4,971
RELOCATE FACILITIES. INSTALL 11 FEET OF 2 INCH POLY AND 6 FEET OF 3 INCH
POLY AND 937 FEET OF 4 INCH POLY AND 420 FEET OF 8 INCH POLY AND
ABANDON 11 FEET OF 2 INCH POLY AND 300 FEET OF 3 INCH STEEL AND 3 FEET
OF 3 INCH POLY AND 470 FEET OF 6 INCH STEEL AND 398 FEET OF 8 INCH STEEL
ALONG VICKI STREET TO ACCOMMODATE CITY OF HALTOM CITY STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY
RELOCATION OF
FACILITIES OCTOBER
1877 080.63546 4,158
RELOCATE FACILITIES. INSTALL 598 FEET OF 6 INCH POLY AND ABANDON 598
FEET OF 6 INCH STEEL ALONG PLANO PARKWAY TO ACCOMMODATE CITY OF
PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES OCTOBER
1878 080.63547 28
RELOCATE FACILITIES. INSTALL 150 FEET OF 2 INCH POLY ALONG METHVIN
STREET AND ABANDON 253 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
RELOCATION OF
FACILITIES OCTOBER
1879 080.63548 2,239
RELOCATE FACILITIES. INSTALL 10 FEET OF 2 INCH POLY AND 935 FEET OF 4 INCH
POLY AND ABANDON 8 FEET OF 2 INCH POLY AND 9 FEET OF 4 INCH POLY ALONG
MARYS LANE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1880 080.63553 (35)
ABANDON DISTRICT REGULATOR STATION 9 IN BALLINGER IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY OCTOBER
1881 080.63557 272
ABANDON 445 FEET OF 3 INCH STEEL ALONG SYCAMORE STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY OCTOBER
1882 080.63570 0
ABANDON DISTRICT REGULATOR STATION(S) 131 ALONG KINGS HIGHWAY AND
EDGEFIELD AVENUE IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1883 080.63574 2,807
INSTALL 2786 FEET OF 2 INCH POLY AND 1009 FEET OF 4 INCH POLY AND
ABANDON 103 FEET OF 2 INCH POLY AND 353 FEET OF 3 INCH POLY AND 2505
FEET OF 4 INCH STEEL ALONG COLBERT STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER
1884 080.63581 1,684
RELOCATE FACILITIES. INSTALL 1020 FEET 4 INCH POLY ALONG ARMSTRONG AND
ABANDON 907 FEET OF 4 INCH STEEL AND 110 FEET OF 4 INCH POLY TO
ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
1885 080.63586 3,960
RELOCATE FACILITIES. INSTALL 2535 FEET OF 2 INCH POLY AND 125 FEET OF 4
INCH POLY AND ABANDON 2411 FEET OF 2 INCH STEEL AND 24 FEET OF 2 INCH
POLY AND 83 FEET OF 4 INCH STEEL ALONG NORTH 25TH STREET TO
ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 60 of 178
279
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1886 080.63588 430
RELOCATE FACILITIES. INSTALL 78 FEET OF 4 INCH POLY AND ABANDON 83 FEET
OF 4 INCH STEEL ALONG NORTH 25TH STREET TO ACCOMMODATE CITY OF
WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
1887 080.63589 3,279
INSTALL 1360 FEET OF 2 INCH POLY AND 365 FEET OF 4 INCH POLY AND ABANDON
200 FEET OF 6 INCH STEEL AND 1520 FEET OF 4 INCH STEEL AND 111 FEET OF 3
INCH STEEL ALONG WEST 4TH STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER
1888 080.63590 926
RELOCATE FACILITIES. INSTALL 150 FEET OF 6 INCH POLY AND ABANDON 150
FEET OF 6 INCH STEEL ALONG BOSQUE AT WOODED ACRES TO ACCOMMODATE
CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
1889 080.63594 2
ABANDON DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURKBURNETT SYSTEM INTEGRITY SEPTEMBER
1890 080.63603 2,657
INSTALL 1112 FEET OF 4 INCH POLY AND ABANDON 961 FEET OF 4 INCH STEEL
AND 146 FEET OF 4 INCH POLY AND 21 FEET OF 6 INCH STEEL ALONG MOSS
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND SYSTEM INTEGRITY OCTOBER
1891 080.63606 1,939
ABANDON 20 FEET OF 6 INCH STEEL AND 66 FEET OF 12 INCH STEEL ALONG
NEWMORE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1892 080.63607 5,106
RELOCATE FACILITIES. INSTALL 840 FEET OF 4 INCH POLY AND ABANDON 246
FEET OF 2 INCH STEEL AND 20 FEET OF 2 INCH POLY AND 130 FEET OF 3 INCH
POLY AND 34 FEET OF 4 INCH STEEL AND 305 FEET OF 4 INCH POLY ALONG LEE
STREET TO ACCOMMODATE CITY OF GREENVILLE STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE
RELOCATION OF
FACILITIES OCTOBER
1893 080.63608 739
INSTALL 588 FEET OF 2 INCH POLY AND ABANDON 586 FEET OF 2 INCH STEEL
ALONG SAN CARLOS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER
1894 080.63609 484
INSTALL GROUNDBED AND RECTIFIER AND ABANDON GROUNDBED AND
RECTIFIER ON LINE O1 IN DALLAS COUNTY TO PROVIDE ADEQUATE CATHODIC
PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY OCTOBER
1895 080.63610 793
INSTALL RECTIFIER AND GROUND BED AND ABANDON RECTIFIER AND GROUND
BED IN GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
1896 080.63615 1,490
RELOCATE FACILITIES. INSTALL 928 FEET OF 2 INCH POLY AND 3 FEET OF 3 INCH
POLY AND ABANDON 803 FEET OF 3 INCH STEEL ALONG GARLAND AVENUE TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1897 080.63616 2,596
INSTALL 1288 FEET OF 2 INCH POLY AND ABANDON 8 FEET OF 4 INCH POLY
ALONG LIPSCOMB STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1898 080.63625 335
RELOCATE FACILITIES. INSTALL 215 FEET OF 4 INCH POLY AND ABANDON 215
FEET OF 3 INCH POLY ALONG WEST 6TH STREET TO ACCOMMODATE CITY OF
CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
RELOCATION OF
FACILITIES OCTOBER
1899 080.63632 5,270
RELOCATE FACILITIES. INSTALL 643 FEET OF 2 INCH AND 2 FEET OF 3 INCH AND
3808 FEET OF 4 INCH POLY AND ABANDON 334 FEET OF 2 INCH STEEL AND 572
FEET OF 2 INCH POLY AND 367 FEET OF 3 INCH STEEL AND 2521 FEET OF 4 INCH
STEEL AND 265 FEET OF 4 INCH POLY AND 1195 FEET OF 6 INCH STEEL AND 73
FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF SULPHUR SPRINGS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS
RELOCATION OF
FACILITIES OCTOBER
1900 080.63644 183,449
INSTALL 9504 FEET OF 10 INCH STEEL ALONG ALONG NORTH AIRFIELD DRIVE AND
ABANDON 8500 FEET OF 10 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER
1901 080.63646 (0)
INSTALL 2,400 FEET OF 4 INCH POLY AND 4,800 FEET OF 2 INCH POLY ALONG THE
STREETS IN THE NEW CRESCENT HEIGHTS SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL SOUTHLAKE GROWTH JANUARY
1902 080.63647 897
INSTALL 594 FEET OF 2 INCH POLY AND ABANDON 460 FEET OF 2 INCH STEEL AND
65 FEET OF 2 INCH POLY ALONG REED STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HONEY GROVE SYSTEM INTEGRITY OCTOBER
1903 080.63653 2,086
INSTALL 1325 FEET OF 2 INCH POLY ALONG HEARON STREET AND ABANDON 781
FEET OF 2 INCH STEEL AND 106 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER
1904 080.63655 36
ABANDON DISTRICT REGULATOR STATION 01 ALONG WILBARGER AND 12TH IN
VERNON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER
1905 080.63674 842
INSTALL 464 FEET OF 2 INCH POLY ALONG LOOP 561 AND ABANDON 598 FEET OF
2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DESOTO SYSTEM INTEGRITY OCTOBER
1906 080.63677 784
RELOCATE FACILITIES. INSTALL 1062 FEET OF 2 INCH POLY AND ABANDON 187
FEET OF 2 INCH STEEL AND 546 FEET OF 3 INCH STEEL AND 20 FEET OF 4 INCH
STEEL ALONG CULBERSON STREET TO ACCOMMODATE CITY OF GAINESVILLE
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
RELOCATION OF
FACILITIES OCTOBER
1907 080.63679 1,423
RELOCATE FACILITIES. INSTALL 1435 FEET OF 2 INCH POLY ALONG WOODBRIDGE
ROAD AND ABANDON 493 FEET OF 2 INCH STEEL AND 2167 FEET OF 2 INCH POLY
AND 175 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FOREST HILL STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
RELOCATION OF
FACILITIES OCTOBER
1908 080.63680 598
RELOCATE FACILITIES. INSTALL 74 FEET OF 2 INCH POLY AND 51 FEET OF 4 INCH
POLY AND ABANDON 58 FEET OF 2 INCH POLY AND 7 FEET OF 4 INCH POLY
ALONG WACO STREET TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
1909 080.63698 7
ABANDON DISTRICT REGULATOR STATION 163 AT BOWIE AND GORDON IN FORT
WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1910 080.63700 1,807
RELOCATE FACILITIES. INSTALL 1249 FEET OF 2 INCH POLY ALONG CRIPPLE
CREEK AND ABANDON 1249 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
1911 080.63701 3,957
RELOCATE FACILITIES. INSTALL 2626 FEET OF 2 INCH POLY AND ABANDON 500
FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY AND 1600 FEET OF 3 INCH
POLY AND 260 FEET OF 4 INCH STEEL ALONG SUNNYBROOK TO ACCOMMODATE
CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
1912 080.63702 17,952
RELOCATE FACILITIES. INSTALL 3404 FEET OF 2 INCH POLY AND ABANDON 3304
FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY ALONG GREENOAKS TO
ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
1913 080.63703 24,196
RELOCATE FACILITIES. INSTALL 1620 FEET OF 2 INCH POLY ALONG OAK MEADOW
AND ABANDON 1620 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF
IRVING IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
1914 080.63704 11,178
RELOCATE FACILITIES. INSTALL 49 FEET OF 2 INCH POLY AND 10 FEET OF 3 INCH
POLY AND 1152 FEET OF 4 INCH POLY ALONG WILLIAM BREWSTER AND ABANDON
49 FEET OF 2 INCH STEEL AND 10 FEET OF 3 INCH STEEL AND 1152 FEET OF 4 INCH
STEEL TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 61 of 178
280
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1915 080.63705 2,219
RELOCATE FACILITIES. INSTALL 553 FEET OF 4 INCH POLY AND ABANDON 315
FEET OF 3 INCH POLY ALONG PURITAN DRIVE TO ACCOMMODATE CITY OF IRVING
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
1916 080.63712 830
RELOCATE FACILITIES. INSTALL 230 FEET OF 2 INCH POLY AND ABANDON 75
FEET OF 2 INCH POLY ALONG PEACHTREE TO ACCOMMODATE CITY OF PLANO
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES OCTOBER
1917 080.63715 2,055
INSTALL 2404 FEET OF 2 INCH POLY ALONG FARM TO MARKET ROAD 308 AND
ABANDON 650 FEET OF 2 INCH STEEL AND 454 FEET OF 2 INCH POLY AND 755
FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS PENELOPE SYSTEM INTEGRITY OCTOBER
1918 080.63717 795
INSTALL 1300 FEET OF 2 INCH POLY ALONG EASTERN STAR AND ABANDON 1290
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
1919 080.63750 384
INSTALL 500 FEET OF 4 INCH POLY AND ABANDON 480 FEET OF 4 INCH STEEL 10
FEET OF 4 INCH POLY ALONG CADDO STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY OCTOBER
1920 080.63751 4,956
INSTALL 1376 FEET OF 4 INCH POLY AND ABANDON 630 FEET OF 4 INCH STEEL
AND 426 FEET OF 4 INCH POLY ALONG TAYLOR STREET AND WASHINGTON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY OCTOBER
1921 080.63752 102
INSTALL RELIEF VALVE AND AND ABANDON RELIEF VALVE AT AUSTIN COLLEGE IN
SHERMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER
1922 080.63753 35
ABANDON 270 FEET OF 2 INCH STEEL ALONG MARTIN LUTHER KING ROAD IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER
1923 080.63754 170
ABANDON 675 FEET OF 2 INCH STEEL ALONG GOODE STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUITMAN SYSTEM INTEGRITY OCTOBER
1924 080.63768 4
ABANDON DISTRICT REGULATOR STATION 02 ALONG COMANCHE IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY SEPTEMBER
1925 080.63769 2,932
INSTALL 704 FEET OF 4 INCH STEEL AND ABANDON 683 FEET OF 4 INCH STEEL
ALONG US HIGHWAY 84 EAST IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GOLDTHWAITE SYSTEM INTEGRITY OCTOBER
1926 080.63770 6,953
RELOCATE FACILITIES. INSTALL 475 FEET OF 2 INCH POLY AND 15 FEET OF 3 INCH
POLY AND 3168 FEET OF 4 INCH POLY AND ABANDON 297 FEET OF 2 INCH STEEL
AND 6 FEET OF 2 INCH POLY AND 1120 FEET OF 3 INCH STEEL AND 152 FEET OF 3
INCH POLY AND 1798 FEET OF 4 INCH STEEL AND 935 FEET OF 4 INCH POLY ALONG
SOUTH KERR STREET TO ACCOMMODATE CITY OF CORSICANA STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BLOOMING GROVE
RELOCATION OF
FACILITIES OCTOBER
1927 080.63772 3
ABANDON DISTRICT REGULATOR STATION #108 IN DALLAS IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1928 080.63780 7
ABANDON DISTRICT REGULATOR STATION 406 ALONG WEILER BOULEVARD IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1929 080.63782 398
RELOCATE FACILITIES. INSTALL 150 FEET OF 2 INCH POLY AND ABANDON 140
FEET OF 2 INCH POLY ALONG HIGHWAY 377 AND INTERSTATE 35 TO
ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1930 080.63783 496
RELOCATE FACILITIES. INSTALL 270 FEET OF 4 INCH POLY ALONG PINEWOOD AND
ABANDON 170 FEET OF 3 INCH AND 100 FEET OF 4 INCH POLY TO ACCOMMODATE
THE CITY OF ARLINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
1931 080.63785 1,213
RELOCATE FACILITIES. INSTALL 190 FEET OF 2 INCH POLY ALONG SOUTHEAST
LINGLEVILLE ROAD AND MCCART STREET AND ABANDON 140 FEET OF 2 INCH
STEEL TO ACCOMMODATE CITY OF STEPHENVILLE STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
RELOCATION OF
FACILITIES OCTOBER
1932 080.63788 9,527
RELOCATE FACILITIES. ABANDON 887 FEET OF 2 INCH STEEL AND 35 FEET OF 2
INCH POLY AND 420 FEET OF 3 INCH STEEL ALONG FM2862 TO ACCOMMODATE
CITY OF WESTMINSTER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTMINSTER
RELOCATION OF
FACILITIES OCTOBER
1933 080.63790 1,909
INSTALL 620 FEET OF 4 INCH POLY ALONG BRYAN AVENUE AND ABANDON 98
FEET OF 6 INCH STEEL AND 193 FEET OF 6 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1934 080.63810 6,132
INSTALL 900 FEET OF 6 INCH POLY FOR NEW COMMERCIAL DEVELOPMENT AT
NEW DPS BUILINDG IN DFW AIRPORT EULESS TX.
COMMERCIAL OR
INDUSTRIAL EULESS GROWTH MARCH
1935 080.63831 92,562
INSTALL 14 FEET OF 2 INCH POLY AND 6375 FEET OF 4 INCH POLY AND ABANDON
147 FEET OF 2 INCH STEEL AND 800 FEET OF 2 INCH POLY AND 3422 FEET OF 3
INCH STEEL AND 774 FEET OF 6 INCH STEEL ALONG KINKAID DRIVE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1936 080.63850 1,601
INSTALL 650 FEET OF 2 INCH POLY AND 83 FEET OF 4 INCH POLY ALONG
BLOSSOM LANE AND ABANDON 785 FEET OF 2 INCH STEEL AND 63 FEET OF 6
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1937 080.63852 4,251
INSTALL 2561 FEET OF 2 INCH POLY ALONG BURNSIDE AVENUE AND ABANDON
2240 FEET OF 2 INCH STEEL AND 103 FEET OF 2 INCH POLY AND 130 FEET OF 3
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1938 080.63863 2,340
RELOCATE FACILITIES. INSTALL 399 FEET OF 2 INCH POLY AND ABANDON 398
FEET OF 2 INCH STEEL ALONG EGAN STREET TO ACCOMMODATE CITY OF DENTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1939 080.63877 8,179
INSTALL 2500 FEET OF 2 INCH POLY AND ABANDON 2450 FEET OF 2 INCH STEEL
ALONG NORTH 3RD STREET IN CORSICANA IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
1940 080.63878 4,540
INSTALL 81 FEET OF 2 INCH POLY AND 477 FEET OF 4 INCH POLY AND ABANDON
481 FEET OF 2 INCH POLY AND 318 FEET OF 3 INCH STEEL AND 82 FEET OF 3 INCH
POLY ALONG HEARNE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
1941 080.63885 2,364
RELOCATE FACILITIES. INSTALL 268 FEET OF 4 INCH POLY AND ABANDON 200
FEET OF 4 INCH STEEL ALONG CEDAR STREET TO ACCOMMODATE CITY OF
HEARNE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE
RELOCATION OF
FACILITIES OCTOBER
1942 080.63889 19
RELOCATE FACILITIES. INSTALL 21 FEET OF 2 INCH POLY ALONG PARK AVENUE
AND ABANDON 11 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
1943 080.63901 8,975
RELOCATE FACILITIES. INSTALL 1200 FEET OF 2 INCH POLY ALONG ROLLING
RIDGE AND ABANDON 1190 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF
GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
1944 080.63902 1,823
INSTALL 1673 FEET OF 2 INCH POLY ALONG OLD COLONY ROAD AND ABANDON
1237 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1945 080.63904 1,840
RELOCATE FACILITIES. INSTALL 905 FEET OF 4 INCH POLY ALONG CAMPBELL
ROAD AND ABANDON 10 FEET OF 4 INCH POLY AND 932 FEET OF 6 INCH STEEL
AND 10 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1946 080.63906 355
RELOCATE FACILITIES. INSTALL 201 FEET OF 2 INCH POLY AND ABANDON 60 FEET
OF 1.25 INCH POLY ALONG BRADLEY STREET TO ACCOMMODATE CITY OF
MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 62 of 178
281
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1947 080.63907 58,169
RELOCATE FACILITIES. INSTALL 307 FEET OF 4 INCH POLY AND 3938 FEET OF 6
INCH POLY AND ABANDON 275 FEET OF 4 INCH POLY AND 3880 FEET OF 6 INCH
POLY ALONG HICKORY CREEK WEST TO ACCOMMODATE THE CITY OF DENTON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
1948 080.63911 8,805
INSTALL 908 FEET OF 2 INCH POLY AND 1161 FEET OF 4 INCH POLY ALONG RIVER
BEND DRIVE AND ABANDON 700 FEET OF 2 INCH POLY AND 800 FEET OF 3 INCH
POLY AND 340 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER
1949 080.63914 2,364
RELOCATE FACILITIES. INSTALL 1868 FEET OF 4 INCH POLY ALONG LONGHORN
TRAIL AND ABANDON 1880 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1950 080.63917 1,194
INSTALL 602 FEET OF 4 INCH POLY ALONG 3RD STREET AND ABANDON 110 FEET
OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WALNUT SPRINGS SYSTEM INTEGRITY OCTOBER
1951 080.63919 724
INSTALL 450 FEET OF 2 INCH AND 4INCH POLY AND ABANDON 250 FEET OF 2 INCH
AND 100 FEET OF 3 INCH STEEL ALONG BRIGGS STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1952 080.63937 261
RELOCATE FACILITIES. INSTALL 70 FEET OF 6 INCH POLY ALONG KELLER
PARKWAY AND ABANDON 50 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
KELLER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER
RELOCATION OF
FACILITIES OCTOBER
1953 080.63938 1,319
RELOCATE FACILITIES. INSTALL (9) POLY SERVICES AND ABANDON (9) POLY
SERVICES ALONG STEEPLECHASE DRIVE TO ACCOMMODATE THE CITY OF IRVING
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
1954 080.63942 1,047
INSTALL 389 FEET OF 4 INCH POLYALONG LAMAR STREET AND ABANDON 96
FEET OF 4 INCH STEEL AND 307 FEET OF 4 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROYSE CITY SYSTEM INTEGRITY OCTOBER
1955 080.63945 1,120,640
RELOCATE FACILITIES. INSTALL 1265 FEET OF 6 INCH AND 450 FEET OF 2 INCH
POLY, 200 FEET OF 10 INCH STEEL CASING AND DISTRICT REGULATOR STATION
#009 ALONG NORTHEAST MAIN AND ABAONDON 1265 FEET OF 6 INCH STEEL AND 2
DRSS TO ACCOMODATE THE CITY OF ENNIS IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY SEPTEMBER
1956 080.63946 3,243
INSTALL 3826 FEET OF 2 INCH POLY ALONG CROXTON ROAD AND ABANDON 945
FEET OF 2 INCH STEEL AND 2251 FEET OF 2 INCH POLY AND 70 FEET OF 4 INCH
POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA SYSTEM INTEGRITY OCTOBER
1957 080.63955 417
INSTALL 38 FEET OF 2 INCH POLY ALONG 9TH STREET AND ABANDON 23 FEET OF
2 INCH STEEL AND 25 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
1958 080.63970 1
ABANDON DISTRICT REGULATOR STATION 93 ALONG SHEFIELD IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
1959 080.63977 3,415
INSTALL 254 FEET OF 6 INCH AND 11 FEET OF 4 INCH POLY AND ABANDON 212
FEET OF 6 INCH STEEL AND 23 FEET OF 6 INCH AND 3 FEET OF 4 INCH POLY
ALONG LOCUST STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER
1960 080.63978 1,155
INSTALL 1023 FEET OF 2 INCH POLY ALONG PECAN STREET AND 395 FEET OF 4
INCH POLY AND ABANDON 1580 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER
1961 080.63979 894
RELOCATE FACILITIES. INSTALL 927 FEET OF 2 INCH POLY AND ABANDON 42 FEET
OF 2 INCH POLY ALONG HAWTHORNE STREET TO ACCOMMODATE CITY OF IRVING
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
1962 080.63995 930
RELOCATE FACILITIES. INSTALL 154 FEET OF 2 INCH POLY AND ABANDON 184
FEET OF 2 INCH STEEL ALONG PRAIRIE STREET TO ACCOMMODATE CITY OF
EVERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN
RELOCATION OF
FACILITIES OCTOBER
1963 080.64001 200
RELOCATE FACILITIES. INSTALL 46 FEET OF 2 INCH POLY AND ABANDON 27 FEET
OF 2 INCH POLY ALONG PEARSON AVENUE TO ACCOMMODATE CITY OF
MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES OCTOBER
1964 080.64003 667
INSTALL 150 FEET OF 2 INCH POLY ALONG ROCKWALL AND ABANDON 265 FEET OF
2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER
1965 080.64005 728
RELOCATE FACILITIES. INSTALL 155 FEET OF 8 INCH POLY ALONG GREENS
PRAIRIE TRAIL AND ABANDON 135 FEET OF 8 INCH POLY TO ACCOMMODATE CITY
OF COLLEGE STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
RELOCATION OF
FACILITIES OCTOBER
1966 080.64016 2,750
INSTALL 1030 FEET OF 2 INCH POLY ALONG RANCH ROAD AND MESQUITE LANE
AND ABANDON 5 FEET OF 6 INCH AND 7 FEET OF 4 INCH POLY AND 581 FEET OF 2
INCH STEEL AND 475 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER
1967 080.64025 146,344
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES
IN THE CITY SWEETWATER IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER
1968 080.64026 3,041
INSTALL 6 FEET OF 2 INCH POLY AND 4 FEET OF 4 INCH POLY AND 608 FEET OF 6
INCH POLY AND ABANDON 537 FEET OF 2 INCH STEEL ALONG WILLIAMS DRIVE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER
1969 080.64035 7
ABANDON DISTRICT REGULATOR 157 IN FORT WORTH ALONG GLEN GARDEN
DRIVE AND SOUTH RIVERSIDE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1970 080.64049 159,924
INSTALL 120 FEET OF 2 INCH POLY AND 180 FEET OF 4 INCH POLY AND 780 FEET
OF 6 INCH POLY AND 800 FEET OF 12 INCH POLY AND ABANDON 15 FEET OF 2
INCH STEEL AND 20 FEET OF 4 INCH STEEL AND 40 FEET OF 4 INCH POLY AND 70
FEET OF 6 INCH STEEL AND 1187 FEET OF 12 INCH STEEL ALONG JONES STREET
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1971 080.64051 1,821
INSTALL 301 FEET OF 2 INCH POLY AND 258 FEET OF 4 INCH POLY AND ABANDON
333 FEET OF 2 INCH POLY AND 263 FEET OF 3 INCH STEEL ALONG SMALL HILL
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
1972 080.64053 3,253
INSTALL 1245 FEET OF 4 INCH POLY AND ABANDON 1015 FEET OF 4 INCH STEEL
AND 400 FEET OF 4 INCH POLY ALONG NEW YORK AVENUE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
1973 080.64070 45
RELOCATE FACILITIES. INSTALL 21 FEET OF 4 INCH POLY AND ABANDON 10 FEET
OF 4 INCH POLY ALONG CROSSLAKE PARKWAY TO ACCOMMODATE CITY OF
WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
1974 080.64090 130,445
RELOCATE FACILITIES. ABANDON 55 FEET OF 2 INCH STEEL AND 1934 FEET OF 2
INCH POLY AND 149 FEET OF 3 INCH STEEL AND 700 FEET OF 3 INCH POLY AND
356 FEET OF 4 INCH STEEL ALONG MELISSA ROAD TO ACCOMMODATE CITY OF
MELISSA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA
RELOCATION OF
FACILITIES OCTOBER
1975 080.64103 (18)
RELOCATE FACILITIES. ABANDON 287 FEET OF 6 INCH POLY ALONG DALLAS
PARKWAY TO ACCOMMODATE CITY OF FRISCO STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
RELOCATION OF
FACILITIES OCTOBER
1976 080.64115 219
INSTALL (1) SERVICE LINE AND ABANDON DALLAS DRS249 ALONG PRESTON ROAD
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER
1977 080.64118 231
INSTALL RTU AT DISTRICT REGULATOR 02 ALONG LINE L8C AND ABANDON RTU
AND VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 63 of 178
282
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
1978 080.64122 2,765
RELOCATE FACILITIES. INSTALL 776 FEET OF 2 INCH POLY AND ABANDON 969
FEET OF 2 INCH POLY ALONG DENLEY TO ACCOMMODATE CITY OF DALLAS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
1979 080.64128 2,043
RELOCATE FACILITIES. INSTALL 1223 FEET OF 2 INCH POLY AND 17 FEET OF 3
INCH POLY AND 13 FEET OF 4 INCH POLY AND ABANDON 1148 FEET OF 3 INCH
STEEL ALONG CRENSHAW DRIVE TO ACCOMMODATE CITY OF DALLAS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
1980 080.64130 174,433
RELOCATE FACILITIES. INSTALL 277 FEET OF 2 INCH POLY AND 16 FEET OF 3 INCH
POLY AND 13 FEET OF 4 INCH POLY AND 2493 FEET OF 8 INCH POLY AND
ABANDON 16 FEET OF 3 INCH POLY AND 13 FEET OF 6 INCH STEEL AND 2200 FEET
OF 8 INCH STEEL ALONG HAMPTON ROAD TO ACCOMMODATE CITY OF DALLAS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
1981 080.64131 150,148
RELOCATE FACILITIES. INSTALL 1011 FEET OF 12 INCH AND 1190 FEET OF 2 INCH
POLY AND ABANDON 930 FEET OF 16 INCH STEEL AND 208 FEET OF 2 INCH POLY
ALONG GASTON AVENUE TO ACCOMMODATE CITY OF DALLAS STREET PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
1982 080.64132 12,514
RELOCATE FACILITIES. INSTALL 2850 FEET OF 4 INCH POLY AND ABANDON 2850
FEET OF 4 INCH POLY ALONG US HIGHWAY 175 TO ACCOMMODATE TXDOT STREET
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
RELOCATION OF
FACILITIES OCTOBER
1983 080.64138 135
INSTALL 282 FEET OF 2 INCH POLY ALONG WEST CEDAR AND ABANDON 278 FEET
OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY OCTOBER
1984 080.64139 48,597
RELOCATE FACILITIES. INSTALL 625 FEET OF 4 INCH POLY AND ABANDON 400
FEET OF 4 INCH STEEL AND 88 FEET OF 4 INCH POLY ALONG FM 407 TO
ACCOMMODATE CITY OF JUSTIN STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JUSTIN
RELOCATION OF
FACILITIES OCTOBER
1985 080.64141 36,675
INSTALL 2200 FEET OF 12 INCH, 275 FEET OF 4 INCH AND 90 FEET OF 2 INCH POLY
ABANDON 198 FEET OF 2 INCH STEEL AND 360 FEET OF 6 INCH STEEL AND 2128
FEET OF 18 INCH STEEL ALONG SCYENE ROAD IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
1986 080.64144 297
RELOCATE FACILITIES. INSTALL 90 FEET OF 4 INCH POLY ALONG WEST FELIX AND
ABANDON 70 FEET OF 4 INCH CAST IRON TO ACCOMMODATE THE CITY OF FORT
WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1987 080.64146 1,366
RELOCATE FACILITIES. INSTALL 255 FEET OF 4 INCH POLY AND 230 FEET OF 6
INCH POLY AND ABANDON 50 FEET OF 4 INCH STEEL AND 210 FEET OF 4 INCH
POLY AND 220 FEET OF 6 INCH POLY ALONG HEMPHILL DRIVE TO ACCOMMODATE
CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1988 080.64150 23,392
INSTALL 1049 FEET OF 4 INCH POLY AND ABANDON 139 FEET OF 2 INCH STEEL
AND 935 FEET OF 3 INCH STEEL ALONG CHURCH STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER
1989 080.64152 7
ABANDON DISTRICT REGULATOR 130 IN FORT WORTH AT THE EVANS AVENUE AND
EAST JESSAMINE STREET. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
1990 080.64154 12,988
RELOCATE FACILITIES. INSTALL 177 FEET OF 6 INCH POLY ALONG HERITAGE
TRACE ALONG FARM TO MARKET ROAD 156 AND ABANDON 150 FEET OF 6 INCH
POLY TO ACCOMMODATE TEXAS DEPARTMENT OF TRANSPORTATION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1991 080.64155 3,794
RELOCATE FACILITIES. INSTALL 809 FEET OF 6 INCH POLY AND ABANDON 809
FEET OF 6 INCH POLY ALONG FM 156 TO ACCOMMODATE TXDOT IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1992 080.64157 39,550
RELOCATE FACILITIES. INSTALL 7 FEET OF 2 INCH POLY AND 232 FEET OF 6 INCH
POLY AND ABANDON 10 FEET OF 2 INCH POLY ALONG VICTORIA DRIVE AND FM
156 TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1993 080.64158 43,927
RELOCATE FACILITIES. INSTALL 16 FEET OF 2 INCH POLY AND 166 FEET OF 6 INCH
POLY AND ABANDON 12 FEET OF 2 INCH POLY ALONG HIGHLAND DRIVE AND FM
156 TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1994 080.64159 55,446
RELOCATE FACILITIES. INSTALL 1000 FEET OF 6 INCH POLY AND ABANDON 525
FEET OF 6 INCH STEEL ALONG WESTERN CENTER TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
1995 080.64163 5,551
INSTALL 2594 FEET OF 4 INCH POLY AND ABANDON 2255 FEET OF 3 INCH STEEL
AND 346 FEET OF 3 INCH POLY ALONG BRYANT AND ARCHER IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLYDE SYSTEM INTEGRITY OCTOBER
1996 080.64168 0
ABANDON DISTRICT REGULATOR STATION #048 IN DALLAS AS PART OF THE AREA
REPLACEMENT PROJECT AR ID#1627.1 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
1997 080.64173 105
INSTALL 151 FEET OF 2 INCH POLY AND ABANDON 765 FEET OF 2 INCH STEEL
AND 210 FEET OF 2 INCH POLY AND 483 FEET OF 3 INCH STEEL AND 39 FEET OF 3
INCH POLY AND 400 FEET OF 4 INCH STEEL AND 40 FEET OF 4 INCH POLY ALONG
MCLELLAND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY OCTOBER
1998 080.64175 7,813
INSTALL 951 FEET OF 2 INCH POLY AND 2423 FEET OF 4 INCH POLY AND ABANDON
2359 FEET OF 2 INCH STEEL AND 481 FEET OF 2 INCH POLY AND 173 FEET OF 4
INCH STEEL ALONG ARKANSAS AND MORRIS IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEYMOUR SYSTEM INTEGRITY OCTOBER
1999 080.64185 8,660
RELOCATE FACILITIES. INSTALL 394 FEET OF 6 INCH POLY AND ABANDON 295
FEET OF 6 INCH POLY ALONG COPPER CROSSING DRIVE ACROSS F.M. 156 TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2000 080.64186 7,576
RELOCATE FACILITIES. INSTALL 4 FEET OF 4 INCH POLY AND 224 FEET OF 6 INCH
POLY AND ABANDON 210 FEET OF 4 INCH POLY AND 8 FEET OF 6 INCH POLY
ALONG GRAND CENTRAL PARKWAY ACROSS F.M. 156 TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2001 080.64193 7
ABANDON DISTRICT REGULATOR STATION 158 IN FORT WORTH AT THE
TENNESSEE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
2002 080.64198 1,828
INSTALL 1095 FEET OF 2 INCH POLY AND ABANDON 127 FEET OF 2 INCH POLY
AND 423 FEET OF 4 INCH STEEL ALONG RINGLING LAKE ROAD IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND SYSTEM INTEGRITY OCTOBER
2003 080.64202 11,023
RELOCATE FACILITIES. INSTALL 381 FEET OF 2 INCH POLY AND ABANDON 390
FEET OF 2 INCH STEEL ALONGWEST THIRD STREET TO ACCOMMODATE CITY OF
ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
2004 080.64216 19,733
INSTALL 2021 FEET OF 2 INCH POLY AND 2 FEET OF 3 INCH POLY AND 2344 FEET
OF 4 INCH POLY AND ABANDON 3224 FEET OF 3 INCH STEEL AND 326 FEET OF 3
INCH POLY AND 495 FEET OF 4 INCH STEEL AND 345 FEET OF 4 INCH POLY AND
1055 FEET OF 6 INCH STEEL AND 80 FEET OF 6 INCH POLY ALONG 27TH AND AVE O
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER
2005 080.64234 9,923
INSTALL 4600 FEET OF 2 INCH POLY ALONG THE STREETS OF GIDEON GROVE
NORTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH OCTOBER
MTX Additions
Page 64 of 178
283
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2006 080.64247 1,462
INSTALL 2410 FEET OF 2 INCH POLY AND 412 FEET OF 4 INCH POLY AND ABANDON
142 FEET OF 2 INCH STEEL AND 643 FEET OF 2 INCH POLY AND 2324 FEET OF 3
INCH STEEL AND 18 FEET OF 3 INCH POLY ALONG ORCHARD STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY OCTOBER
2007 080.64248 883
INSTALL 510 FEET OF 4 INCH POLY AND INSTALL ALONG HICKORY STREET AND
PRESTON ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FRISCO GROWTH MARCH
2008 080.64249 471
INSTALL 347 FEET OF 2 INCH POLY AND ABANDON 395 FEET OF 2 INCH STEEL
AND 139 FEET OF 2 INCH POLY AND 366 FEET OF 3 INCH STEEL AND 127 FEET OF 3
INCH POLY AND 475 FEET OF 4 INCH STEEL ALONG MAIN STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAINT JO SYSTEM INTEGRITY OCTOBER
2009 080.64254 947
RELOCATE FACILITIES. INSTALL (15) 0.75 INCH SERVICE LINES ALONG MOLLIMAR
AND ABANDON (15) 0.75 INCH SERVICES TO ACCOMMODATE THE CITY OF PLANO
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES OCTOBER
2010 080.64274 445
RELOCATE FACILITIES. INSTALL 28 FEET OF 3 INCH POLY AND ABANDON 28 FEET
OF 3 INCH POLY ALONG MUNICIPAL TO ACCOMMODATE CITY OF PLANO STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES OCTOBER
2011 080.64295 1,253
INSTALL DISTRICT REGULATOR STATION ALONG WILCOX AND ABANDON DISTRICT
REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ROCKDALE SYSTEM INTEGRITY OCTOBER
2012 080.64302 1
ABANDON DISTRICT REGULATOR STATION 081 IN UNIVERSITY PARK, DALLAS
COUNTY AS PART OF THE AREA REPLACEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER
2013 080.64303 950
INSTALL 1790 FEET OF 2 INCH POLY AND ABANDON 3283 FEET OF 2 INCH POLY
ALONG FM498 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY OCTOBER
2014 080.64305 350
ABANDON DISTRICT REGULATOR STATION #15 IN ABILENE TAYLOR COUNTY AS
PART OF THE AREA REPLACEMENTS IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
2015 080.64309 1
ABANDON DISTRICT REGULATOR STATION 033 ALONG BISBEE DRIVE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
2016 080.64312 1,041
RELOCATE FACILITIES. INSTALL 420 FEET OF 6 INCH POLY AND ABANDON 410
FEET OF 6 INCH POLY ALONG KELLER HASLET ROAD TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2017 080.64317 1,963
RELOCATE FACILITIES. INSTALL 353 FEET OF 4 INCH POLY AND ABANDON 340
FEET OF 4 INCH POLY MAIN ALONG SH 360 TO ACCOMMODATE CONSTRUCTION OF
COMMERCIAL DRIVEWAY FOR AMERICAN AIRLINES FACILITY. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES JANUARY
2018 080.64319 1,134
INSTALL 312 FEET OF 2 INCH POLY AND ABANDON 301 FEET OF 2 INCH STEEL
ALONG CARDINAL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MURCHISON SYSTEM INTEGRITY OCTOBER
2019 080.64322 247
RELOCATE FACILITIES. INSTALL 15 FEET OF 4 INCH POLY AND ABANDON 10 FEET
OF 4 INCH POLY ALONG CLEVELAND AVENUE TO ACCOMMODATE CITY OF WACO
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
2020 080.64323 (11)
ABANDON 10 FEET OF 2 INCH STEEL AND 137 FEET OF 2 INCH POLY ALONG IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
2021 080.64326 35,662
RELOCATE FACILITIES. INSTALL 1053 FEET OF 2 INCH POLY AND 609 FEET OF 6
INCH POLY AND ABANDON 1367 FEET OF 2 INCH STEEL ALONG WATERCRESS
DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2022 080.64328 1,065
INSTALL 117 FEET OF 2 INCH POLY AND 781 FEET OF 4 INCH POLY AND ABANDON
65 FEET OF 2 INCH STEEL AND 772 FEET OF 3 INCH STEEL ALONG EAST MAIN
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY OCTOBER
2023 080.64330 18,264
INSTALL 143 SERVICE LINES AND ABANDON 143 SERVICE LINES IN DALLAS IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2024 080.64339 433
RELOCATE FACILITIES. INSTALL 10 FEET OF 2 INCH POLY AND 13 FEET OF 4 INCH
POLY AND 114 FEET OF 6 INCH POLY AND ABANDON 7 FEET OF 2 INCH POLY AND
105 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2025 080.64341 1,139
INSTALL 462 FEET OF 2 INCH POLY AND ABANDON 195 FEET OF 2 INCH STEEL
AND 165 FEET OF 2 INCH POLY ALONG MAIN STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
2026 080.64342 938
INSTALL 305 FEET OF 2 INCH POLY AND ABANDON 300 FEET OF 2 INCH STEEL
ALONG AL LIPSCOM WAY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2027 080.64346 73,681
FUNCTIONAL PROJECT COVERING THE REPLACEMENT OF MAINS AND SERVICE
LINES IN GEORGETOWN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER
2028 080.64366 150,649
RELOCATE FACILITIES. INSTALL NEW DRS ON TUCASA ST. AND ABANDON 330
FEET OF 8 INCH STEEL, 481 FEET OF 6 INCH STEEL AND 500 FEET OF 4 INCH IP PE
ALONG GRAUWYLER RD. TO ACCOMMODATE TX-DOT CAPITAL HIGHWAY PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
2029 080.64376 885
RELOCATE FACILITIES. INSTALL (14) POLY SERVICES ALONG NORTH TRAIL STREET
AND ABANDON (4) POLY SERVICES AND (10) STEEL SERVICES TO ACCOMMODATE
CITY OF CROWLEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CROWLEY
RELOCATION OF
FACILITIES OCTOBER
2030 080.64378 (41)
ABANDON 544 FEET OF 2 INCH POLY ALONG VAUGHN DRIVE TO ACCOMMODATE
THE CITY OF BURLESON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY OCTOBER
2031 080.64380 333
RELOCATE FACILITIES. INSTALL 38 FEET OF 6 INCH POLY AND ABANDON 30 FEET
OF 6 INCH STEEL ALONG SPRAGUE DRIVE TO ACCOMMODATE CITY OF WICHITA
FALLS STREET IMPROVEMENT PROJECT. IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
RELOCATION OF
FACILITIES OCTOBER
2032 080.64393 2,197
RELOCATE FACILITIES. INSTALL 1816 FEET OF 2 INCH POLY AND ABANDON 1791
FEET OF 2 INCH POLY ALONG FOLKSTONE DRIVE TO ACCOMMODATE CITY OF
FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
RELOCATION OF
FACILITIES OCTOBER
2033 080.64395 2,227
INSTALL 181 FEET OF 2 INCH POLY AND 397 FEET OF 4 INCH POLY AND 1287 FEET
OF 8 INCH POLY AND ABANDON 75 FEET OF 2 INCH STEEL AND 56 FEET OF 2 INCH
POLY AND 376 FEET OF 4 INCH STEEL AND 1125 FEET OF 8 INCH STEEL ALONG
FAIRBANKS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER
2034 080.64398 31,686
RELOCATE FACILITIES. INSTALL 980 FEET OF 2 INCH, 625 FEET OF 4 INCH, 5980
FEET OF 6 INCH AND 225 FEET OF 8 INCH POLY ALONG SH 352 AND ABANDON 975
FEET OF 2 INCH, 125 FEET OF 3 INCH AND 6470 FEET OF 4 INCH POLY THE
ACCOMMODATE TXDOT DRAINAGE PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
RELOCATION OF
FACILITIES OCTOBER
2035 080.64399 1,081
RELOCATE FACILITIES. INSTALL 2,775 FEET OF 4 INCH POLY ALONG RED BIRD
MALL AND ABANDON 1,750 FEET OF 2 INCH AND 1,060 FEET OF 4 INCH POLY TO
ACCOMMODATE NEW CONSTRUCTION. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES DECEMBER
2036 080.64400 6,997
INSTALL 1060 FEET OF 2 INCH POLY AND 3412 FEET OF 4 INCH POLY AND
ABANDON 185 FEET OF 2 INCH STEEL AND 3894 FEET OF 4 INCH STEEL AND 30
FEET OF 4 INCH POLY AND 738 FEET OF 6 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLORADO CITY SYSTEM INTEGRITY OCTOBER
2037 080.64407 893
INSTALL DISTRICT REGULATOR STATION ALONG VICTORIA AND ABANDON
DISTRICT REGULATOR STATION 26 IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 65 of 178
284
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2038 080.64410 170
RELOCATE FACILITIES. INSTALL 15 FEET OF 4 INCH STEEL AND ABANDON 10 FEET
OF 4 INCH STEEL ALONG HARRISON LANE TO ACCOMMODATE CITY OF HURST
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS HURST
RELOCATION OF
FACILITIES OCTOBER
2039 080.64414 9,927
RELOCATE FACILITIES. INSTALL 46 FEET OF 2 INCH STEEL AND 12 FEET OF 8 INCH
STEEL AND ABANDON 4 FEET OF 6 INCH STEEL AND 8 FEET OF 8 INCH STEEL TO
ACCOMMODATE CITY OF SOUTHLAKE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE
RELOCATION OF
FACILITIES OCTOBER
2040 080.64416 807
INSTALL DISTRICT REGULATOR STATION ALONG SAUNDERS STREET AND
ABANDON DISTRICT REGULATOR STATION 15 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE SYSTEM INTEGRITY OCTOBER
2041 080.64420 1,234
RELOCATE FACILITIES. INSTALL 420 FEET OF 6 INCH POLY AND ABANDON 400
FEET OF 6 INCH STEEL ALONG CARROLL STREET TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2042 080.64422 7
ABANDON DISTRICT REGULATOR STATION ALONG ROBINWOOD DRIVE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
2043 080.64423 7
ABANDON DISTRICT REGULATOR STATION ALONG MICKI LYNN AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
2044 080.64424 1,507
RELOCATE FACILITIES. INSTALL 10 FEET OF 4 INCH POLY AND 330 FEET OF 8 INCH
POLY AND ABANDON 10 FEET OF 4 INCH POLY AND 330 FEET OF 8 INCH POLY
ALONG BUSINESS 114 TO ACCOMMODATE CITY OF ROANOKE STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ROANOKE
RELOCATION OF
FACILITIES OCTOBER
2045 080.64431 3,608
INSTALL 1900 FEET OF 4 INCH POLY AND 2900 FEET OF 2 INCH POLY ALONG PARK
PLACE BOULEVARD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH OCTOBER
2046 080.64434 2,201
RELOCATE FACILITIES. INSTALL 49 POLY SERVICES AND ABANDON 49 POLY AND
STEEL SERVICES ALONG COLLINS STREET TO ACCOMMODATE CITY OF
ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
2047 080.64438 42,072
RELOCATE FACILITIES. INSTALL 1027 FEET OF 2 INCH POLY AND 1569 FEET OF 6
INCH POLY AND 3 FEET OF 8 INCH POLY AND ABANDON 1162 FEET OF 2 INCH
STEEL AND 80 FEET OF 2 INCH POLY AND 48 FEET OF 6 INCH STEEL ALONG LAKE
DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2048 080.64440 262
INSTALL 311 FEET OF 2 INCH POLY AND ABANDON 213 FEET OF 2 INCH STEEL
AND 70 FEET OF 2 INCH POLY AND 14 FEET OF 3 INCH STEEL ALONG CAROLINA
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2049 080.64442 35,053
RELOCATE FACILITIES. INSTALL 185 FEET OF 8 INCH, 2750 FEET OF 6 INCH AND
2750 FEET OF 4 INCH POLY ALONG BETSY LANE AND ABANDON 2800 FEET OF 8
INCH STEEL TO ACCOMMODATE THE CITY OF IRVING IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
2050 080.64451 9,010
INSTALL 534 FEET OF 2 INCH POLY AND ABANDON 498 FEET OF 2 INCH STEEL
ALONG MASSEY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER
2051 080.64467 4,356
INSTALL 990 FEET OF 2 INCH POLY AND 65 FEET OF 4 INCH POLY AND 940 FEET
OF 6 INCH POLY AND ABANDON 740 FEET OF 2 INCH STEEL AND 52 FEET OF 4
INCH STEEL AND 68 FEET OF 4 INCH POLY AND 820 FEET OF 6 INCH STEEL AND 118
FEET OF 6 INCH POLY ALONG PENROSE AVENUE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2052 080.64471 5,439
RELOCATE FACILITIES. INSTALL 10 FEET OF 3 INCH POLY AND 2248 FEET OF 4
INCH POLY AND ABANDON 991 FEET OF 3 INCH STEEL AND 815 FEET OF 3 INCH
POLY AND 486 FEET OF 4 INCH STEEL ALONG HILLCREST TO ACCOMMODATE CITY
OF HICO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HICO
RELOCATION OF
FACILITIES OCTOBER
2053 080.64472 234
ABANDON DISTRICT REGULATOR STATION #201 IN DALLAS AS PART OF THE AREA
REPLACEMENT PROJECT AR ID#1738.1 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2054 080.64474 (8)
ABANDON DISTRICT REGULATOR STATION 031 ALONG SPRING AVENUE IN DALLAS
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2055 080.64487 6,480
INSTALL 25 FEET OF 4 INCH POLY AND 1800 FEET OF 6 INCH POLY AND ABANDON
50 FEET OF 2 INCH POLY AND 850 FEET OF 4 INCH STEEL AND 675 FEET OF 6 INCH
STEEL ALONG VICKERY DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2056 080.64491 1,100
ABANDON DISTRICT REGULATOR STATION 027 ALONG GASTON IN DALLAS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2057 080.64493 406
RELOCATE FACILITIES. INSTALL 230 FEET OF 2 INCH POLY AND ABANDON 214
FEET OF 2 INCH POLY ALONG GUENTHER AVENUE TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2058 080.64494 50,673
INSTALL 3000 FEET OF 4 INCH POLY AND 4850 FEET OF 2 INCH POLY ALONG THE
STREETS OF TRIPLE DIAMOND RANCH SUBDIVISION IN MANSFIELD, TX. RESIDENTIAL MANSFIELD GROWTH DECEMBER
2059 080.64495 3,240
RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH POLY AND ABANDON 275
FEET OF 4 INCH STEEL ALONG KIMBERLY DRIVE TO ACCOMMODATE THE CITY OF
ARLINGTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
2060 080.64500 4,294,419
INSTALL 6.5 MILES OF 12 INCH STEEL AND 1.5 MILES OF 12 INCH, 0.65 MILES OF 8
INCH AND 1.65 MILES OF 6 INCH POLY AND ABANDON 5.1 MILES OF 12 INCH STEEL
AND 4.05 MILES OF 16 INCH STEEL ALONG GARDEN RIDGE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY DECEMBER
2061 080.64506 64
INSTALL 148 FEET OF 2 INCH POLY AND ABANDON 437 FEET OF 2 INCH STEEL
AND 568 FEET OF 2 INCH POLY ALONG 4TH AND ELM IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEGARGEL SYSTEM INTEGRITY OCTOBER
2062 080.64517 3,181
INSTALL 343 FEET OF 2 INCH POLY AND ABANDON 330 FEET OF 2 INCH POLY
ALONG SW 3RD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER
2063 080.64518 0
ABANDON (1) DISTRICT REGULATOR STATION ALONG WILDER AVENUE STREET IN
THE TOWN OF BELLMEAD IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BELLMEAD SYSTEM INTEGRITY OCTOBER
2064 080.64519 976
INSTALL 431 FEET OF 2 INCH POLY AND ABANDON 383 FEET OF 2 INCH STEEL
AND 48 FEET OF 2 INCH POLY ALONG DAVIS STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER
2065 080.64522 42,098
RELOCATE FACILITIES. INSTALL 980 FEET OF 2 INCH POLY AND 1425 FEET OF 8
INCH POLY AND ABANDON 390 FEET OF 2 INCH STEEL AND 583 FEET OF 2 INCH
POLY AND 284 FEET OF 6 INCH STEEL ALONG WATERCRESS DRIVE TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2066 080.64527 510
RELOCATE FACILITIES. INSTALL 6 FEET OF 4 INCH POLY AND 130 FEET OF 6 INCH
POLY AND ABANDON 6 FEET OF 4 INCH POLY AND 140 FEET OF 6 INCH POLY
ALONG MORRISS ROAD TO ACCOMMODATE CITY OF FLOWER MOUND STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
RELOCATION OF
FACILITIES OCTOBER
2067 080.64531 (419,921)
RELOCATE FACILITIES. INSTALL 900 FEET OF 6 INCH POLY AND ABANDON 900
FEET OF 6 INCH POLY ALONG MARK IV PARKWAY TO ACCOMMODATE TXDOT
CONFLICT. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES MARCH
2068 080.64540 110,980
INSTALL 3 VALVES, 28 FEET OF 10 INCH STEEL, AND 135 FEET OF 16 INCH STEEL
AND ABANDON 2 VALVES, 47 FEET OF 10 INCH STEEL, 105 FEET OF 12 INCH STEEL,
AND 116 FEET OF 16 INCH STEEL ALONG PIPELINE ROAD IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY OCTOBER
2069 080.64541 84,262
INSTALL 120 FEET OF 16 INCH STEEL AND ABANDON 120 FEET OF 12 INCH STEEL
ALONG PIPELINE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 66 of 178
285
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2070 080.64546 36,213
INSTALL 2550 FEET OF 12 INCH, 60 FEET OF 8 INCH, 425 FEET OF 4 INCH AND 150
FEET OF 2 INCH POLY ALONG SOUTH LANCASTER ROAD AND ABANDON 2550 FEET
OF 12 INCH, 80 FEET OF 8 INCH AND 30 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2071 080.64551 2,574
INSTALL (2) REGLUATORS AND (1) RELIEF VALVE, ABANDON (2) REGLUATORS AND
(1) RELIEF VALVE ALONG LINE L15-5 IN THE TOWN OF GATESVILLE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE SYSTEM INTEGRITY OCTOBER
2072 080.64553 994
INSTALL CLOCK SPRINGS ALONG LINE D IN DALLAS COUNTY TO REMEDIATE
ANOMALIES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER
2073 080.64556 1,830
RELOCATE FACILITIES. INSTALL 1350 FEET OF 2 INCH POLY AND ABANDON 1285
FEET OF 2 INCH POLY ALONG BRENNAN DRIVE TO ACCOMMODATE CITY OF
PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES OCTOBER
2074 080.64557 512
RELOCATE FACILITIES. INSTALL 41 FEET OF 4 INCH POLY AND ABANDON 40 FEET
OF 3 INCH STEEL ALONG HIGHWAY 377 TO ACCOMMODATE CITY OF ARGYLE
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ARGYLE
RELOCATION OF
FACILITIES OCTOBER
2075 080.64558 9,898
RELOCATE FACILITIES. INSTALL 1950 FEET OF 2 INCH POLY ALONG MONTICELLO
AND ABANDON 1900 FEET OF 1.25 INCH POLY TO ACCOMMODATE THE CITY OF
PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES OCTOBER
2076 080.64559 1,569
INSTALL 375 FEET OF 4 INCH POLY AND ABANDON 188 FEET OF 2 INCH STEEL AND
187 FEET OF 4 INCH STEEL ALONG NANTUCKET DRIVE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY OCTOBER
2077 080.64569 44,663
RELOCATE FACILITIES. INSTALL 2586 FEET OF 4 INCH AND 70 FEET OF 8 INCH
POLY ALONG PENINSULA CLUB CIRCLE AND ABANDON 2163 FEET OF 2 INCH
STEEL, 507 FEET OF 1.25 INCH, 90 FEET OF 2 INCH AND 60 FEET OF 8 INCH POLY
TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2078 080.64571 1,719
INSTALL 370 FEET OF 2 INCH POLY AND 400 FEET OF 4 INCH POLY AND ABANDON
712 FEET OF 2 INCH POLY AND 510 FEET OF 4 INCH STEEL AND 5 FEET OF 4 INCH
POLY AND 72 FEET OF 6 INCH STEEL ALONG PATRICK STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUBLIN SYSTEM INTEGRITY OCTOBER
2079 080.64572 32,864
RELOCATE FACILITIES. NSTALL 1352 FEET OF 4 INCH AND 493 FEET OF 8 INCH
POLY ALONG PENINSULA CLUB CIR WESTAND ABANDON 1352 FEET OF 2 INCH
STEEL AND 483 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF LAKE WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2080 080.64576 272
RELOCATE FACILITIES. INSTALL 94 FEET OF 8 INCH POLY AND ABANDON 82 FEET
OF 8 INCH POLY ALONG IH 30 AND AIRPORT ROAD TO ACCOMMODATE CITY OF
ROCKWALL STREET IMPROVEMENT PROJECT.IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL
RELOCATION OF
FACILITIES OCTOBER
2081 080.64579 6,773
ABANDON 2217 FEET OF 2 INCH STEEL, 6 FEET OF 3 INCH STEEL, 720 FEET OF 4
INCH STEEL, AND 1311 FEET OF 6 INCH STEEL ALONG RANGER ROAD IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER SYSTEM INTEGRITY OCTOBER
2082 080.64583 7,024
INSTALL 66 FEET OF 12 INCH STEEL AND ABANDON 70 FEET OF 12 INCH STEEL
ALONG LINE CA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2083 080.64584 57,941
RELOCATE FACILITIES. INSTALL 417 FEET OF 2 INCH AND 2503 FEET OF 6 INCH
POLY AND ABANDON 2066 FEET OF 4 INCH, 291 FEET OF 2 INCH POLY ALONG
MCKINNEY STREET TO ACCOMMODATE CITY OF DENTON STREET PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
2084 080.64589 43,700
RELOCATE FACILITIES. INSTALL 2643 FEET OF 2 INCH, 30 FEET OF 4 INCH AND 2916
FEET OF 6 INCH POLY ALONG GLADE ROAD AND ABANDON 148 FEET OF 2 INCH, 30
FEET OF 3 INCH, 409 FEET OF 4 INCH AND 292 FEET OF 6 INCH POLY AND 2274
FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF COLLEYVILLE STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
RELOCATION OF
FACILITIES OCTOBER
2085 080.64593 13,930
RELOCATE FACILITIES. INSTALL 1400 FEET OF 2 INCH POLY AND ABANDON 1390
FEET OF 2 INCH POLY ALONG HOLLAND DRIVE TO ACCOMMODATE THE CITY OF
GARLAND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
2086 080.64594 14,778
RELOCATE FACILITIES. INSTALL 1100 FEET OF 2 INCH POLY ALONG GREEN OAKS
DRIVE AND ABANDON 1090 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF
GARLAND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
2087 080.64599 40,511
RELOCATE FACILITIES. INSTALL 1384 DEET OF 8 INCH POLY AND ABANDON 635
FEET OF 8 INCH POLY ALONG TEEL PARKWAT TO ACCOMMODATE CITY OF FRISCO
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
RELOCATION OF
FACILITIES OCTOBER
2088 080.64601 11,849
RELOCATE FACILITIES. INSTALL 1868 FEET OF 8 INCH AND 45 FEET OF 4 INCH
POLY ALONG WATERCRESS DRIVE AND ABANDON 1739 FEET OF 8 INCH AND 89
FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF LAKE WORTH IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH
RELOCATION OF
FACILITIES OCTOBER
2089 080.64603 44
ABANDON (1) DISTRICT REGULATOR STATION 11 ALONG IDLEWILD DRIVE IN THE
TOWN OF BROWNWOOD IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER
2090 080.64604 7,274
INSTALL 200 FEET OF STEEL AND ABANDON 200 FEET OF STEEL IN WISE COUNTY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2091 080.64606 18
ABANDON DISTRICT REGLUATOR STATION 12 IN SAN ANGELO IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
2092 080.64608 57,608
INSTALL 3651 FEET OF 4 INCH AND 1218 FEET OF 2 INCH POLY ALONG THE
STREETS OF VIZCAYA 6E, 6F AND 7C. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
2093 080.64612 1,965
ABANDON 1500 FEET OF 2 INCH STEEL ALONG CARLSON STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2094 080.64614 218
RELOCATE FACILITIES. INSTALL 27 FEET OF 6 INCH POLY AND ABANDON 19 FEET
OF 6 INCH POLY ALONG CUSTER DRIVE AND LOOKOUT DRIVE TO ACCOMMODATE
CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES OCTOBER
2095 080.64629 (580)
RELOCATE FACILITIES. INSTALL 1042 FEET OF 4 INCH POLY AND ABANDON 1037
FEET OF 4 INCH POLY ALONG US 87TO ACCOMMODATE TXDOT ROAD
IMPROVEMENT PROJECT. ALL CUSTOMERS COMFORT
RELOCATION OF
FACILITIES JANUARY
2096 080.64630 347
RELOCATE FACILITIES. INSTALL 313 FEET OF 2 INCH POLY AND 80 FEET OF 4 INCH
POLY AND ABANDON 4 FEET OF 2 INCH STEEL AND 303 FEET OF 2 INCH POLY AND
71 FEET OF 4 INCH STEEL ALONG KAZMEIER TO ACCOMMODATE CITY OF BRYAN
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES OCTOBER
2097 080.64632 626
RELOCATE FACILITIES. INSTALL 374 FEET OF 2 INCH POLY AND ABANDON 199
FEET OF 3 INCH STEEL ALONG COLLEGE MAIN STREET TO ACCOMMODATE CITY
OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES OCTOBER
2098 080.64633 776
INSTALL 984 FEET OF 2 INCH POLY AND ABANDON 1007 FEET OF 2 INCH STEEL
ALONG HOLLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FRANKLIN SYSTEM INTEGRITY OCTOBER
2099 080.64640 9
RELOCATE FACILITIES. ABANDON 25 FEET OF 4 INCH POLY ALONG COUNTY ROAD
110 TO ACCOMMODATE CITY OF ROUND ROCK STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
RELOCATION OF
FACILITIES OCTOBER
2100 080.64647 428
ABANDON 873 FEET OF 3 INCH STEEL ALONG LEHIGH DRIVE IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 67 of 178
286
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2101 080.64650 886
INSTALL 1057 FEET OF 2 INCH POLY AND 6 FEET OF 3 INCH POLY AND ABANDON 3
FEET OF 2 INCH POLY AND 1054 FEET OF 3 INCH STEEL ALONG OAK DRIVE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY OCTOBER
2102 080.64654 687
INSTALL 500 FEET OF 4 INCH AND 250 FEET OF 2 INCH POLY ALONG WEST 3RD
AVENUE AND ABANDON 500 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
2103 080.64660 6
ABANDON 355 FEET OF 4 INCH STEEL ALONG MCKINNEY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER
2104 080.64661 8,001
RELOCATE FACILITIES. INSTALL 1675 FEET OF 8 INCH POLY ALONG WATERCRESS
DRIVE AND ABANDON 1677 FEET OF 6 INCH STEEL AND 480 FEET OF 6 INCH POLY
TO ACCOMMODATE THE CITY OF LAKE WORTH IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH
RELOCATION OF
FACILITIES OCTOBER
2105 080.64662 649
RELOCATE FACILITIES. INSTALL 520 FEET OF 2 INCH POLY AND ABANDON 520
FEET OF 2 INCH POLY ALONG BUENA VISTA DRIVE TO ACCOMMODATE CITY OF
MARBLE FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARBLE FALLS
RELOCATION OF
FACILITIES OCTOBER
2106 080.64669 863
RELOCATE FACILITIES. INSTALL 686 FEET OF 2 INCH POLY AND ABANDON 342
FEET OF 2 INCH STEEL AND 341 FEET OF 2 INCH POLY ALONG RHOMBURG STREET
TO ACCOMMODATE CITY OF BURNET STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURNET
RELOCATION OF
FACILITIES OCTOBER
2107 080.64680 900
INSTALL 401 FEET OF 4 INCH POLY AND ABANDON 396 FEET OF 3 INCH STEEL
ALONG CYPRESS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS HUBBARD SYSTEM INTEGRITY OCTOBER
2108 080.64685 1,213
INSTALL 512 FEET OF 6 INCH POLY AND ABANDON 350 FEET OF 3 INCH STEEL
ALONG SLOAN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS TAYLOR SYSTEM INTEGRITY OCTOBER
2109 080.64688 3,915
RELOCATE FACILITIES. INSTALL 1604 FEET OF 8 INCH POLY AND ABANDON 1602
FEET OF 6 INCH STEEL ALONG WATERCRESS DRIVE TO ACCOMMODATE CITY OF
LAKE WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH
RELOCATION OF
FACILITIES OCTOBER
2110 080.64689 645
RELOCATE FACILITIES. INSTALL 199 FEET OF 4 INCH POLY AND ABANDON 107
FEET OF 2 INCH STEEL AND 25 FEET OF 3 INCH STEEL ALONG BULWER AVENUE
TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
RELOCATION OF
FACILITIES OCTOBER
2111 080.64691 906
RELOCATE FACILITIES. INSTALL 539 FEET OF 2 INCH POLY AND ABANDON 509
FEET OF 2 INCH STEEL ALONG HAMILTON STREET TO ACCOMMODATE CITY OF
KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
RELOCATION OF
FACILITIES OCTOBER
2112 080.64692 1,145
INSTALL 633 FEET OF 2 INCH POLY AND ABANDON 771 FEET OF 2 INCH STEEL
AND DISTRICT REGULATOR STATION 7 ALONG STREETS OF MIDLOTHIAN IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY OCTOBER
2113 080.64699 415
INSTALL 690 FEET OF 2 INCH POLY AND ABANDON 527 FEET OF 2 INCH STEEL, 126
FEET OF 2 INCH POLY, AND 327 FEET OF 6 INCH STEELAND DISTRICT REGULATOR
STATION 03 ALONG MILL AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY OCTOBER
2114 080.64703 85,024
RELOCATE FACILITIES. INSTALL 2120 FEET OF 6 INCH, 120 FEET OF 4 INCH AND 90
FEET OF 2 INCH POLY ALONG RANCH VIEW RD. AND ABANDON 2120 FEET OF 6
INCH, 120 FEET OF 4 INCH AND 90 FEET OF 2 INCH STEEL TO ACCOMMODATE THE
CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2115 080.64712 152
INSTALL RELIEF VALVE AT REGULATOR STATION IN DENTON AND ABANDON TWO
RELIEF VALVES AT DISTRICT REGULATOR STATION 34 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER
2116 080.64713 8
ABANDON DISTRICT REGULATOR STATION #138 IN DALLAS, DALLAS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2117 080.64717 649
INSTALL 4585 FEET OF 2 INCH AND 1570 FEET OF 4 INCH POLY ALONG THE
STREETS OF MEDOW RUN SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH MARCH
2118 080.64719 4,163
RELOCATE FACILITIES. ABANDON 2000 FEET OF 6 INCH STEEL ALONG
WATERCRESS DRIVE TO ACCOMMODATE CITY OF LAKE WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH
RELOCATION OF
FACILITIES OCTOBER
2119 080.64722 3,802
RELOCATE FACILITIES. INSTALL 677 FEET OF 3 INCH STEEL AND ABANDON 651
FEET OF 3 INCH STEEL ALONG AGAPE DRIVE TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2120 080.64724 104,359
INSTALL 14700 FEET OF 2 INCH POLY AND ABANDON 28600 FEET OF 2 INCH POLY
ALONG PICKREL ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS
UNICORPORATED COUNTY
AREA, (GOODLET) SYSTEM INTEGRITY OCTOBER
2121 080.64730 1,115
RELOCATE FACILITIES. INSTALL 633 FEET OF 4 INCH POLY AND ABANDON 633
FEET OF 4 INCH STEEL AND 15 FEET OF 4 INCH POLY ALONG SANDERSON
AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2122 080.64735 1,003
INSTALL 716 FEET OF 2 INCH POLY AND ABANDON 95 FEET OF 2 INCH STEEL AND
92 FEET OF 2 INCH POLY AND 573 FEET OF 3 INCH STEEL ALONG NORTH
COVINGTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
2123 080.64739 4,502
INSTALL DISTRICT REGULATOR STATION AND ABANDON MEDICIAL MOUND
DISTRICT REGULATOR STATION 01 ALONG FM 1167 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILLICOTHE SYSTEM INTEGRITY OCTOBER
2124 080.64740 12,270
INSTALL 1700 FEET OF 2 INCH POLY AND 1570 FEET OF 4 INCH POLY AND
ABANDON 132 FEET OF 2 INCH POLY, 906 FEET OF 4 INCH POLY, AND 766 FEET OF
6 INCH POLY ALONG SYLVANIA AVENUE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2125 080.64741 841
RELOCATE FACILITIES. INSTALL 499 FEET OF 2 INCH POLY AND 47 FEET OF 6 INCH
POLY AND ABANDON 500 FEET OF 2 INCH STEEL AND 43 FEET OF 6 INCH STEEL
ALONG CHUCK DRIVE TO ACCOMMODATE CITY OF WICHITA FALLS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
RELOCATION OF
FACILITIES OCTOBER
2126 080.64750 19,515
INSTALL 900 FEET OF 2 INCH POLY ALONG FIELDSIDE AND ABANDON 890 FEET OF
2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
2127 080.64769 287
RELOCATE FACILITIES. INSTALL 225 FEET OF 2 INCH POLY AND ABANDON 180
FEET OF 2 INCH POLY ALONG VERANDA LANE TO ACCOMMODATE CITY OF
COLLEYVILLE IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
RELOCATION OF
FACILITIES OCTOBER
2128 080.64770 1,244
INSTALL 1166 FEET OF 2 INCH POLY AND ABANDON 1152 FEET OF 2 INCH STEEL
AND 6 FEET OF 2 INCH POLY ALONG MESQUITE AVENUE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA SYSTEM INTEGRITY OCTOBER
2129 080.64775 977
INSTALL 478 FEET OF 2 INCH POLY AND 157 FEET OF 4 INCH POLY AND ABANDON
515 FEET OF 2 INCH STEEL, 408 FEET OF 2 INCH POLY AND 1 DISTRICT
REGLUATOR STATION ALONG WILLOW STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MALONE SYSTEM INTEGRITY OCTOBER
2130 080.64776 1,311
INSTALL 690 FEET OF 2 INCH POLY AND ABANDON 700 FEET OF 2 INCH POLY AND
1 DISTRICT REGLUATOR STATION ALONG EVANS STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER
2131 080.64781 5,594
RELOCATE FACILITIES. INSTALL 340 FEET OF 2 INCH POLY AND 1704 FEET OF 4
INCH POLY AND ABANDON 350 FEET OF 2 INCH POLY, 5 FEET OF 3 INCH STEEL,
AND 1723 FEET OF 3 INCH POLY ALONG LACKLAND ROAD TO ACCOMMODATE
CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 68 of 178
287
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2132 080.64784 1,837
INSTALL 5 FEET OF 2 INCH POLY AND 20 FEET OF 4 INCH POLY AND 1008 FEET OF
6 INCH POLY AND ABANDON 38 FEET OF 12 INCH STEEL ALONG MARTIN LUTHER
KING DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
2133 080.64799 9
ABANDON DISTRICT REGULATOR STATION #259 IN UNIVERSITY PARK, DALLAS
COUNTY AS PART OF THE AREA REPLACEMENT PROJECT AR ID#1895.1 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER
2134 080.64810 4,452
RELOCATE FACILITIES. INSTALL 275 FEET OF 2 INCH POLY AND ABANDON 8 FEET
OF 2 INCH POLY AND 350 FEET OF 4 INCH STEEL ALONG NORTH 7TH STREET TO
ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
2135 080.64825 293,792
INSTALL 3.9 MILES OF 10 INCH STEEL ALONG LINE KP1 AND ABANDON 3.9 MILES
OF 10 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY DECEMBER
2136 080.64826 14,965
RELOCATE FACILITIES. INSTALL 817 FEET OF 2 INCH POLY AND ABANDON 802
FEET OF 2 INCH POLY ALONG LAMAR STREET TO ACCOMMODATE CITY OF
ROANOKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROANOKE
RELOCATION OF
FACILITIES OCTOBER
2137 080.64827 575
INSTALL (1) DISTRICT REGULATOR STATION AND ABANDON (1) DISTRICT
REGULATOR STATION ALONG 5TH STREET IN THE TOWN OF CLIFTON IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON SYSTEM INTEGRITY OCTOBER
2138 080.64830 421
INSTALL 79 FEET OF 2 INCH POLY AND 415 FEET OF 4 INCH POLY AND ABANDON
23 FEET OF 2 INCH STEEL AND 52 FEET OF 2 INCH POLY AND 450 FEET OF 4 INCH
STEEL ALONG FILLMORE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2139 080.64834 10,074
RELOCATE FACILITIES. INSTALL 2392 FEET OF 2 INCH POLY AND ABANDON 2401
FEET OF 2 INCH POLY AND 14 FEET OF 3 INCH POLY ALONG GARLAND AVENUE TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2140 080.64838 8,973
INSTALL 7 CLOCK SPRINGS ALONG LINE CA(2ND) IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH PIPELINE INTEGRITY OCTOBER
2141 080.64843 679
INSTALL 975 FEET OF 2 INCH POLY AND ABANDON 1034 FEET OF 2 INCH STEEL
AND 5 FEET OF 2 INCH POLY ALONG CHAFFIN STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY OCTOBER
2142 080.64850 2,917
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION ALONG WALNUT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER
2143 080.64874 774 INSTALL 6200 FEET OF 8 INCH POLY ALONG LONE STAR ROAD. ALL CUSTOMERS MANSFIELD
SYSTEM
IMPROVEMENT APRIL
2144 080.64876 8,866
INSTALL 1050 FEET OF 4 INCH, 995 FEET OF 2 INCH POLY ALONG WASHINGTON
STREET AND ABANDON 1395 FEET OF 6 INCH, 1140 FEET OF 3 INCH STEEL, 33
FEET OF 3 INCH, 15 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY OCTOBER
2145 080.64880 19,712
INSTALL 28 FEET OF 8 INCH STEEL AND 2392 FEET OF 12 INCH STEEL AND
ABANDON 2406 FEET OF 8 INCH STEEL ALONG AVENUE E IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
2146 080.64895 113
RELOCATE FACILITIES. INSTALL 40 FEET OF 6 INCH POLY AND ABANDON 35 FEET
OF 6 INCH POLY ALONG NORTH JUPITER ROAD TO ACCOMMODATE CITY OF
ALLEN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN
RELOCATION OF
FACILITIES OCTOBER
2147 080.64896 5,994
RELOCATE FACILITIES. INSTALL 595 FEET OF 2 INCH POLY, 86 FEET OF 4 INCH
POLY, AND 674 FEET OF 6 INCH POLY AND ABANDON 53 FEET OF 3 INCH STEEL,
580 FEET OF 4 INCH STEEL AND 650 FEET OF 6 INCH STEEL ALONG SALEM COURT
TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2148 080.64904 1,563
INSTALL 1900 FEET OF 2 INCH POLY ALONG NORTH GLASS STREET AND ABANDON
1880 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FRANKLIN SYSTEM INTEGRITY OCTOBER
2149 080.64905 960,030
INSTALL 5 MILES OF 10 INCH STEEL AND ABANDON 7.3 MILES OF STEEL ALONG
LINE B IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
2150 080.64927 549
RELOCATE FACILITIES. INSTALL 279 FEET OF 2 INCH POLY AND ABANDON 203
FEET OF 2 INCH STEEL AND 41 FEET OF 2 INCH POLY ALONG 22ND STREET TO
ACCOMMODATE CITY OF PARIS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
RELOCATION OF
FACILITIES OCTOBER
2151 080.64930 3,788
INSTALL 326 FEET OF 2 INCH POLY AND 1749 FEET OF 4 INCH POLY AND ABANDON
332 FEET OF 2 INCH STEEL AND 85 FEET OF 2 INCH POLY AND 1340 FEET OF 4
INCH STEEL AND 156 FEET OF 4 INCH POLY ALONG FILES STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ITASCA SYSTEM INTEGRITY OCTOBER
2152 080.64934 811
RELOCATE FACILITIES. INSTALL 312 FEET OF 2 INCH POLY AND ABANDON 10
FEET OF 3 INCH STEEL AND 310 FEET OF 3 INCH POLY ALONG RUCKER TO
ACCOMMODATE CITY OF GRANBURY STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY
RELOCATION OF
FACILITIES OCTOBER
2153 080.64935 (1)
ABANDON 473 FEET OF 8 INCH CAST IRON ALONG ELSBETH IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2154 080.64937 13,190
INSTALL 2500 FEET OF 4 INCH POLY ALONG SAINT LOUIS AVENUE AND ABANDON
1800 FEET OF 4 INCH STEEL AND 700 FEET OF 4 INCH POLY IN ACCORDANCE WITH
THE TEXAS RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2155 080.64940 301
RELOCATE FACILITIES. INSTALL 292 FEET OF 2 INCH POLY AND ABANDON 363
FEET OF 2 INCH STEEL ALONG BARCELONA COURT TO ACCOMMODATE CITY OF
WICHITA FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
RELOCATION OF
FACILITIES OCTOBER
2156 080.64943 2,132
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION ALONG ELM STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER
2157 080.64944 150
INSTALL 245 FEET OF 2 INCH POLY ALONG TYLER AND ABANDON 290 FEET OF 2
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2158 080.64946 2
ABANDON DISTRICT REGULATOR STATION 30 AS PART OF THE AREA
REPLACEMENT IN SAN ANGELO IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
2159 080.64947 1,956
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION ALONG BRANCH STREET IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER
2160 080.64956 (284,202)
RELOCATE FACILITIES. INSTALL 1341 FEET OF 6 INCH POLY AND ABANDON 1376
FEET OF 6 INCH POLY ALONG KELLER HICKS ROAD TO ACCOMMODATE TXDOT
ROADWAY PROJECT. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES FEBRUARY
2161 080.64959 (1)
ABANDON DISTRICT REGULATOR STATION 412 IN FORT WORTH ALONG VAUGHN
BOULEVARD. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2162 080.64965 1,109
INSTALL 702 FEET OF 2 INCH POLY AND ABANDON 300 FEET OF 2 INCH STEEL, 209
FEET OF 2 INCH POLY, AND 221 FEET OF 4 INCH STEEL ALONG COMMERCE
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY OCTOBER
2163 080.64966 6,901
INSTALL 1926 FEET OF 2 INCH POLY AND ABANDON 1513 FEET OF 2 INCH STEEL,
52 FEET OF 2 INCH POLY, AND 351 FEET OF 4 INCH STEEL ALONG 3RD STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER SYSTEM INTEGRITY OCTOBER
2164 080.64967 345
INSTALL 333 FEET OF 2 INCH POLY AND ABANDON 396 FEET OF 2 INCH STEEL
AND DISTRICT REGULATOR STATION 05 ALONG BURKETT STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 69 of 178
288
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2165 080.64968 733
INSTALL 610 FEET OF 2 INCH POLY AND ABANDON 374 FEET OF 2 INCH STEEL, 368
FEET OF 3 INCH STEEL, AND 1 DISTRICT REGLUATOR STATION ALONG EAST 2ND
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR SYSTEM INTEGRITY OCTOBER
2166 080.64969 6,337
INSTALL 3105 FEET OF 2 INCH POLY AND 1062 FEET OF 4 INCH POLY AND
ABANDON 88 FEET OF 2 INCH STEEL, 305 FEET OF 2 INCH POLY, 3017 FEET OF 3
INCH STEEL, 350 FEET OF 3 INCH POLY, 404 FEET OF 4 INCH STEEL, AND 256 FEET
OF 4 INCH POLY ALONG MARSHALL STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKDALE SYSTEM INTEGRITY OCTOBER
2167 080.64979 13
ABANDON DISTRICT REGULATOR STATION #080 IN UNIVERSITY PARK, DALLAS
COUNTY AS PART OF THE AREA REPLACEMENT PROJECT AR ID#1944.1 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER
2168 080.64983 2,261
INSTALL REGULATOR AND RELIEF VALVE AND ABANDON REGULATOR AND RELIEF
VALVE AT DRS15 ALONG SEARS STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER
2169 080.64985 5,189
INSTALL DISTRICT REGULATOR STATION IN SHERMAN (DRS24) AND ABANDON
REGULATOR STATION ALONG LAMAR IN ACCORDANCE WITH TEXAS RAILROAD
COMMISSION RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER
2170 080.64995 257
INSTALL CLOCKSPRING(S) ON LINE CA(3RD) TO REPAIR DENT WITH METAL LOSS
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2171 080.65005 4,454
RELOCATE FACILITIES. INSTALL 580 FEET OF 4 INCH POLY AND ABANDON 570
FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF DENTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
2172 080.65008 76,724
RELOCATE FACILITIES. INSTALL 3710 FEET OF 8 INCH AND ABANDON 898 FEET OF
4 INCH POLY TO ACCOMODATE THE CITY OF HASLET IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HASLET
RELOCATION OF
FACILITIES OCTOBER
2173 080.65015 2,209
INSTALL 507 FEET OF 2 INCH POLY AND ABANDON 514 FEET OF 2 INCH STEEL
AND DISTRICT REGULATOR STATION 04 ALONG CRABELL STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN SYSTEM INTEGRITY OCTOBER
2174 080.65021 838
INSTALL 382 FEET OF 2 INCH POLY AND ABANDON 375 FEET OF 2 INCH POLY
ALONG EASTFIELD DRIVE AND YALE BOULEVARD IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY OCTOBER
2175 080.65027 116
INSTALL (2) 2 INCH FISHER EZR REGULATORS AND ABANDON (2) 2 INCH FISHER
399 REGULATORS ON STEPHENVILLE DRS6598.1 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY OCTOBER
2176 080.65030 164
INSTALL 5 FEET OF 4 INCH STEEL ALONG BERRY AND PARK HILL BOULEVARD IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2177 080.65032 722
INSTALL 640 FEET OF 2 INCH POLY ALONG WEST LOVERS AND ABANDON 400 FEET
OF 2 INCH STEEL IS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2178 080.65037 2,823
INSTALL 450 FEET OF 2 INCH POLY ALONG ELM STREET AND ABANDON 130 FEET
OF 3 INCH STEEL AND 85 FEET OF 2 INCH POLY AND 230 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER SYSTEM INTEGRITY OCTOBER
2179 080.65038 249
INSTALL 280 FEET OF 2 INCH POLY ALONG PAWNEE PATHWAY AND ABANDON 145
FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2180 080.65049 1,837
ABANDON 320 FEET OF 4 INCH STEEL ALONG PALESTINE STREET AND
PRARIEVILLE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY OCTOBER
2181 080.65061 1,895
INSTALL 837 FEET OF 2 INCH POLY AND ABANDON 651 FEET OF 2 INCH STEEL
AND 171 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION 07 ALONG
AVENUE I AND 33RD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER
2182 080.65066 388
INSTALL 272 FEET OF 4 INCH POLY AND ABANDON 317 FEET OF 2 INCH STEEL
AND 56 FEET OF 2 INCH POLY AND 281 FEET OF 3 INCH STEEL AND 242 FEET OF 4
INCH STEEL AND 22 FEET OF 4 INCH POLY ALONG8TH STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2183 080.65082 1,622
INSTALL 252 FEET OF 2 INCH POLY AND 1346 FEET OF 4 INCH POLY AND ABANDON
585 FEET OF 2 INCH POLY AND 260 FEET OF 3 INCH POLY AND 1025 FEET OF 4
INCH STEEL AND 228 FEET OF 4 INCH POLY ALONG WALNUT STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY OCTOBER
2184 080.65103 4,391,539
RELOCATE FACILITIES. INSTALL 837 FEET OF 12 INCH AND 881 FEET OF 20 INCH
STEEL ALONG MAIN STREET IN FORT WORTH AND ABANDON 269 FEET OF 12 INCH
AND 244 FEET OF 18 INCH STEEL TO ACCOMODATE BNSF RAILWAY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
2185 080.65117 10,640
RELOCATE FACILITIES. INSTALL 27 FEET OF 4 INCH POLY AND 1369 FEET OF 6
INCH POLY AND ABANDON 1317 FEET OF 4 INCH STEEL AND 17 FEET OF 4 INCH
POLY AND 45 FEET OF 6 INCH STEEL ALONG AMBLER AVENUE TO ACCOMMODATE
CITY OF ABILENE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
RELOCATION OF
FACILITIES OCTOBER
2186 080.65124 4,436
INSTALL A 12 INCH STOPPLE AND (3) BALL VALVES AND ABANDON (3) BALL VALVES
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
2187 080.65125 32,903
RELOCATE FACILITIES. INSTALL 500 FEET OF 4 INCH POLY ALONG BEAR CREEK
PARKWAY AND ABANDON 480 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY
OF KELLER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS KELLER
RELOCATION OF
FACILITIES DECEMBER
2188 080.65131 886 INSTALL A PIG TRAP ON NORTH END OF C22. ALL CUSTOMERS IRVING PIPELINE INTEGRITY DECEMBER
2189 080.65136 1,354
INSTALL 354 FEET OF 4 INCH POLY AND ABANDON 9 FEET OF 2 INCH STEEL AND
538 FEET OF 3 INCH STEEL AND DISTRICT REGULATOR STATION 09 ALONG 17TH
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER
2190 080.65140 1,638
ABANDON DISTRICT REGULATOR STATION #051 IN DALLAS, DALLAS COUNTY AS
PART OF THE AREA REPLACEMENT PROJECT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2191 080.65141 2,109
INSTALL 620 FEET OF 2 INCH POLY AND ABANDON 312 FEET OF 2 INCH STEEL
AND 635 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION 11 ALONG
STREETS OF BALLINGER IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY OCTOBER
2192 080.65144 84,344
RELOCATE FACILITIES. INSTALL 1459 FEET OF 6 INCH, 382 FEET OF 4 INCH AND 246
FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 1715 FEET OF 4 INCH
STEEL AND 242 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CROWLEY
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY
RELOCATION OF
FACILITIES OCTOBER
2193 080.65145 (7)
RELOCATE FACILITIES. ABANDON 225 FEET OF 4 INCH STEEL AND 22 FEET OF 4
INCH POLY ALONG WARREN STREET TO ACCOMMODATE CITY OF BURLESON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON
RELOCATION OF
FACILITIES OCTOBER
2194 080.65146 2,117
INSTALL 438 FEET OF 2 INCH POLY AND ABANDON 386 FEET OF 2 INCH STEEL AND
ABANDON DISTRICT REGULATOR STATION 16 ALONG AVENUE H IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER
2195 080.65156 12,574
INSTALL 266 FEET OF 2 INCH AND 1619 FEET OF 4 INCH POLY AND ABANDON 236
FEET OF 2 INCH AND 1695 FEET OF 3 INCH STEEL AND 118 FEET OF 3 INCH POLY
ALONG HALL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FAIRFIELD SYSTEM INTEGRITY OCTOBER
2196 080.65158 726
RELOCATE FACILITIES. INSTALL 436 FEET OF 2 INCH POLY AND ABANDON 362
FEET OF 2 INCH STEEL AND 68 FEET OF 2 INCH POLY ALONG MISTLETOE LANE TO
ACCOMMODATE CITY OF PANTEGO STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PANTEGO
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 70 of 178
289
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2197 080.65159 3,212
INSTALL 1638 FEET OF 2 INCH POLY AND ABANDON 1274 FEET OF 2 INCH STEEL
ALONG AUSTIN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GATESVILLE SYSTEM INTEGRITY OCTOBER
2198 080.65161 1,520
INSTALL 620 FEET OF 4 INCH POLY AND ABANDON 620 FEET OF 4 INCH POLY
ALONG HIGHWAY 31 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
2199 080.65166 18,108
INSTALL CROWLEY DISTRICT REGULATOR STATION AND ABANDON DISTRICT
REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CROWLEY SYSTEM INTEGRITY OCTOBER
2200 080.65168 21,600
INSTALL (108) POLY SERVICES AND ABANDON (108) STEEL SERVICES IN NORTH
WEST DALLAS ZONE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2201 080.65169 17,492
INSTALL 1610 FEET OF 8 INCH AND 200 FEET OF 4 INCH POLY ALONG FERGUSON
ROAD AND ABANDON 1610 FEET OF 8 INCH, 175 FEET OF 3 INCH AND 25 FEET OF 4
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2202 080.65180 98,448
RELOCATE FACILITIES. INSTALL 2949 FEET OF 2 INCH AND 374 FEET OF 4 INCH
POLY ALONG FM 51 AND ABANDON 1813 FEET OF 2 INCH, 292 FEET OF 4 INCH AND
48 FEET OF 1.25 INCH STEEL AND 305 FEET OF 2 INCH POLY TO ACCOMMODATE
THE CITY OF SPRINGTOWN DRAINAGE AND STREET PROJECT IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SPRINGTOWN
RELOCATION OF
FACILITIES DECEMBER
2203 080.65204 8,067
RELOCATE FACILITIES. INSTALL 1,246 FEET OF 2 INCH, 250 FEET OF 4 INCH, 473
FEET OF 6 INCH AND 1,397 FEET OF 8 INCH POLY AND ABANDON 687 FEET OF 2
INCH, 1,045 FEET OF 4 INCH, 1,742 FEET OF 6 INCH ALONG MONROE STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
RELOCATION OF
FACILITIES OCTOBER
2204 080.65215 855
RELOCATE FACILITIES. INSTALL 895 FEET OF 2 INCH POLY AND ABANDON 46
FEET OF 2 INCH STEEL AND 890 FEET OF 3 INCH STEEL AND 10 FEET OF 4 INCH
STEEL ALONG CULBERSON TO ACCOMMODATE CITY OF GAINESVILLE STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
RELOCATION OF
FACILITIES OCTOBER
2205 080.65223 662
RELOCATE FACILITIES. INSTALL 161 FEET OF 2 INCH POLY AND 374 FEET OF 4
INCH POLY AND ABANDON 536 FEET OF 4 INCH STEEL ALONG EAST STREET TO
ACCOMMODATE CITY OF BELTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON
RELOCATION OF
FACILITIES OCTOBER
2206 080.65229 285
INSTALL 323 FEET OF 2 INCH POLY AND ABANDON 311 FEET OF 2 INCH STEEL
ALONG HUFF STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2207 080.65242 12,909
RELOCATE FACILITIES. INSTALL 1285 FEET OF 2 INCH AND 138 FEET OF 4 INCH
AND 775 FEET OF 6 INCH POLY AND ABANDON 1221 FEET OF 3 INCH AND 125
FEET OF 4 INCH AND 755 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2208 080.65247 366
INSTALL 354 FEET OF 2 INCH POLY AND ABANDON 305 FEET OF 2 INCH STEEL
ALONG HAMPTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2209 080.65250 21,014
INSTALL 3295 FEET OF 2 INCH POLY AND ABANDON 3385 FEET OF 2 INCH STEEL
ALONG MORGAN MILL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY OCTOBER
2210 080.65258 71,969
INSTALL 2600 FEET OF 2 INCH POLY ALONG 7TH STREET AND ABANDON 720 FEET
OF 4 INCH AND 1600 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO SYSTEM INTEGRITY OCTOBER
2211 080.65264 5,666
INSTALL 1407 FEET OF 2 INCH POLY AND 1476 FEET OF 4 INCH POLY AND
ABANDON 805 FEET OF 2 INCH STEEL AND 322 FEET OF 2 INCH POLY AND 1402
FEET OF 4 INCH STEEL AND 110 FEET OF 4 INCH POLY AND 6 FEET OF 6 INCH
STEEL ALONG 15TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
2212 080.65269 666
INSTALL 300 FEET OF 2 INCH POLY ALONG UNIVERSITY DRIVE AND ABANDON
DISTRICT REGULATOR STATION, AND 945 FEET OF 2 INCH STEEL AND 151 FEET OF
2 INCH POLY AND 623 FEET OF 3 INCH STEEL AND 15 FEET OF 3 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY OCTOBER
2213 080.65274 2,221
RELOCATE FACILITIES. INSTALL 175 FEET OF 4 INCH POLY AND ABANDON 170
FEET OF 4 INCH POLY ALONG SOUTH FIRST STREET TO ACCOMMODATE THE CITY
OF GARLAND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
2214 080.65275 52,062
RELOCATE FACILITIES. INSTALL 2780 FEET OF 4 INCH POLY AND 250 FEET OF 4
INCH STEEL AND 300 FEET OF 2 INCH POLY ALONG SH 205 AND ABANDON 2775
FEET OF 2 INCH POLY TO ACCOMMODATE TXDOT IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAVON
RELOCATION OF
FACILITIES OCTOBER
2215 080.65287 5,170
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY AND ABANDON 100
FEET OF 2 INCH POLY ALONG GLENMORE STREET TO ACCOMMODATE THE CITY
OF IRVING IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
2216 080.65294 (48,635)
INSTALL WELDOVER SLEEVES ON LINE D IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2217 080.65296 637
INSTALL 265 FEET OF 4 INCH POLY ALONG S 23RD AND ABANDON 265 FEET OF 4
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
2218 080.65299 13,201
RELOCATE FACILITIES. INSTALL 520 FEET OF 4 INCH POLY ALONG BOWMAN
SPRINGS AND ABANDON 500 FEET OF 4 INCH POLY AND 60 FEET OF 3 INCH POLY
TO ACCOMMODATE THE CITY OF ARLINGTON IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
2219 080.65301 1,840
RELOCATE FACILITIES. INSTALL 371 FEET OF 2 INCH POLY AND 823 FEET OF 4
INCH POLY AND ABANDON 186 FEET OF 2 INCH STEEL AND 184 FEET OF 2 INCH
POLY AND 78 FEET OF 3 INCH STEEL AND 665 FEET OF 4 INCH STEEL AND 92 FEET
OF 4 INCH POLY ALONG 38TH STREET TO ACCOMMODATE CITY OF CORSICANA
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
RELOCATION OF
FACILITIES OCTOBER
2220 080.65302 910
INSTALL 480 FEET OF 4 INCH POLY AND ABANDON 478 FEET OF 4 INCH STEEL
ALONG STONEWALL DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER
2221 080.65305 7,344
RELOCATE FACILITIES. INSTALL 215 FEET OF 4 INCH POLY ALONG PRESTON ROAD
AND ABANDON 215 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF FRISCO
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
RELOCATION OF
FACILITIES OCTOBER
2222 080.65306 1,294
INSTALL 633 FEET OF 2 INCH POLY AND ABANDON 693 FEET OF 2 INCH STEEL
ALONG LEONA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER
2223 080.65312 451
INSTALL 5185 FEET OF 2 INCH AND 1400 FEET OF 6 INCH POLY ALONG STREETS OF
SUNSET CROSSING SUBDIVISION. RESIDENTIAL MANSFIELD GROWTH MARCH
2224 080.65323 33,556
INSTALL 1500 FEET OF 4 INCH POLY AND 4650 FEET OF 2 INCH POLY ALONG
STREETS OF FROST FARMS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH OCTOBER
2225 080.65324 7,091
RELOCATE FACILITIES. INSTALL 1160 FEET OF 2 INCH POLY AND ABANDON 50
FEET OF 2 INCH POLY AND 1025 FEET OF 4 INCH STEEL AND 300 FEET OF 4 INCH
POLY AND 175 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2226 080.65325 3,054
RELOCATE FACILITIES. INSTALL 494 FEET OF 4 INCH POLY AND 4 FEET OF 8 INCH
POLY AND ABANDON 893 FEET OF 4 INCH STEEL AND 50 FEET OF 6 INCH STEEL
ALONG AYERS AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 71 of 178
290
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2227 080.65326 1,379
INSTALL 551 FEET OF 4 INCH POLY AND ABANDON 530 FEET OF 4 INCH CAST IRON
ALONG GRAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
2228 080.65328 661
INSTALL 688 FEET OF 4 INCH POLY AND ABANDON 678 FEET OF 4 INCH STEEL
ALONG 4TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER
2229 080.65329 1,895
RELOCATE FACILITIES. INSTALL 370 FEET OF 2 INCH POLY AND ABANDON 490
FEET OF 2 INCH POLY ALONG VIRGINIA AVENUE TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2230 080.65332 90,286
RELOCATE FACILITIES. INSTALL 840 FEET OF 12 INCH POLY AND 200 FEET OF 4
INCH POLY AND 20 FEET OF 2 INCH POLY AND 1400 FEET OF 6 INCH POLY AND 925
FEET OF 4 INCH AND 80 FEET OF 2 INCH CAST IRON ALONG WALLACE STREET AND
ROSEDALE STREET TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2231 080.65333 (788)
INSTALL 68 FEET OF 2 INCH POLY AND 80 FEET OF 3 INCH POLY AND ABANDON 68
FEET OF 2 INCH POLY AND 80 FEET OF 3 INCH STEEL ALONG HEMBRY STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY OCTOBER
2232 080.65334 26,185
INSTALL 5500 FEET OF 2 INCH POLY AND 600 FEET OF 4 INCH POLY AND 1600 FEET
OF 6 INCH POLY ALONG THE STREETS OF WATERSCAPE SUBDIVISION.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH NOVEMBER
2233 080.65339 (0)
ABANDON 10 FEET OF 2 INCH STEEL AND 242 FEET OF 2 INCH POLY AND 699 FEET
OF 3 INCH STEEL ALONG THROCKMORTON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERENS SYSTEM INTEGRITY OCTOBER
2234 080.65340 94
RELOCATE FACILITIES. INSTALL 83 FEET OF 2 INCH POLY AND ABANDON 77 FEET
OF 2 INCH STEEL ALONG LONGVIEW TO ACCOMMODATE CITY OF WICHITA FALLS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
RELOCATION OF
FACILITIES OCTOBER
2235 080.65341 (25)
ABANDON 217 FEET OF 2 INCH STEEL AND 84 FEET OF 2 INCH POLY ALONG SCOTT
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2236 080.65343 (17)
ABANDON 796 FEET OF 2 INCH STEEL ALONG CHAPMAN ROAD IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROLLING MEADOWS SYSTEM INTEGRITY OCTOBER
2237 080.65344 520
INSTALL 710 FEET OF 2 INCH POLY AND ABANDON 706 FEET OF 2 INCH STEEL
ALONG GUM SPRINGS ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER
2238 080.65347 1,253
INSTALL 40 MOTORIZED REGULATORS AND ABANDON 40 MOTORIZED
REGULATORS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2239 080.65356 12,907
INSTALL 1703 FEET OF 10 INCH STEEL AND ABANDON 1670 FEET OF 6 INCH STEEL
ALONG THE STREETS OF MAYPEARL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MAYPEARL SYSTEM INTEGRITY OCTOBER
2240 080.65359 3,133
INSTALL 12 FEET OF 3 INCH POLY AND 1012 FEET OF 4 INCH POLY AND ABANDON
998 FEET OF 3 INCH STEEL AND 31 FEET OF 3 INCH POLY ALONG VALWOOD
PARKWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY OCTOBER
2241 080.65361 1,239
INSTALL 800 FEET OF 2 INCH POLY AND 6 FEET OF 4 INCH POLY AND ABANDON
428 FEET OF 2 INCH POLY AND 6 FEET OF 4 INCH POLY ALONG WASHINGTON
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY OCTOBER
2242 080.65364 240
INSTALL 310 FEET OF 4 INCH POLY AND ABANDON 310 FEET OF 4 INCH STEEL
ALONG WELSH AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY OCTOBER
2243 080.65367 123,041
INSTALL 1250 FEET OF 8 INCH POLY ALONG STELLA AVENUE AND ABANDON 1180
FEET OF 6 INCH STEEL AND 700 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2244 080.65368 4,456
ABANDON 4282 FEET OF 2 INCH, 18,720 FEET OF 6 INCH STEEL, 151 FEET OF 2
INCH AND 1687 FEET OF 6 INCH POLY ALONG LINE L26 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER
2245 080.65371 21,228
INSTALL 400 FEET OF 4 INCH POLY AND 1150 FEET OF 6 INCH POLY AND ABANDON
260 FEET OF 2 INCH STEEL AND 200 FEET OF 2 INCH POLY AND 1140 FEET OF 6
INCH STEEL ALONG OLIVE STREET IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER
2246 080.65374 803
INSTALL 2575 FEET OF 2 INCH AND 2050 FEET OF 6 INCH POLY ALONG STREETS OF
SIXTH PHASE OF ARCADIA FARMS. RESIDENTIAL PRINCETON GROWTH MARCH
2247 080.65380 18
ABANDON DISTRICT REGULATOR STATION #82 IN UNIVERSITY PARK, IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER
2248 080.65384 4,994
RELOCATE FACILITIES. INSTALL 2554 FEET OF 2 INCH POLY AND ABANDON 2475
FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF RICE STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICE
RELOCATION OF
FACILITIES OCTOBER
2249 080.65386 4,945
INSTALL DEEP WELL GROUND BED AND RECTIFIER AND INSTALL 1 TEST STATION
ALONG LINE U13 IN HASKELL COUNTY. ALL CUSTOMERS HASKELL SYSTEM INTEGRITY OCTOBER
2250 080.65390 4,482
RELOCATE FACILITIES. ABANDON 1077 FEET OF 6 INCH STEEL AND 6 FEET OF 6
INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2251 080.65407 10
ABANDON ONE DISTRICT REGULATOR STATION ALONG FAIRMOUNT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2252 080.65415 318
INSTALL 13 FEET OF 6 INCH POLY AND ABANDON 387 FEET OF 3 INCH AND 11
FEET OF 6 INCH STEEL ALONG BROOK IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2253 080.65418 28,041
INSTALL 2105 FEET OF 4 INCH AND 3681 FEET OF 2 INCH POLY ALONG THE
STREETS OF LARKSPUR PHASE 8. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
2254 080.65421 409
INSTALL AC VOLTAGE AND LIGHTNING MITIGATION ON LINE DALLAS D TO REDUCE
THE AMOUNT OF INDUCED AC TO SAFE LEVELS ON THE PIPELINE. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2255 080.65431 6,464
INSTALL 1555 FEET OF 2 INCH POLY ALONG KIM STREET AND ABANDON 1856 FEET
OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
2256 080.65436 (10)
ABANDON 1629 FEET OF 2 INCH STEEL ALONG MAIN STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2257 080.65437 34,635
RELOCATE FACILITIES. INSTALL 1284 FEET OF 2 INCH POLY AND ABANDON 143
FEET OF 2 INCH STEEL AND 1098 FEET OF 2 INCH POLY ALONG JAMES AVENUE TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2258 080.65443 177,816
RELOCATE FACILITIES. INSTALL 5636 FEET OF 2 INCH POLY AND 1271 FEET OF 4
INCH POLY AND ABANDON 3871 FEET OF 2 INCH STEEL AND 4588 FEET OF 2 INCH
POLY AND 1148 FEET OF 3 INCH STEEL AND 102 FEET OF 3 INCH POLY AND 827
FEET OF 4 INCH STEEL AND 183 FEET OF 4 INCH POLY AND 879 FEET OF 8 INCH
STEEL ALONG GRAHAM STREET TO ACCOMMODATE CITY OF STEPHENVILLE
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
RELOCATION OF
FACILITIES OCTOBER
2259 080.65444 2,244
INSTALL 903 FEET OF 2 INCH POLY AND ABANDON 903 FEET OF 3 INCH STEEL
ALONG WAKE FORREST DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2260 080.65446 1,035
INSTALL 278 FEET OF 2 INCH POLY AND ABANDON 421 FEET OF 2 INCH STEEL
AND 440 FEET OF 2 INCH POLY ALONG TOLOSA ROAD IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEMP SYSTEM INTEGRITY OCTOBER
2261 080.65451 532
RELOCATE FACILITIES. INSTALL 139 FEET OF 4 INCH POLY AND ABANDON 113
FEET OF 3 INCH STEEL ALONG FM1915 TO ACCOMMODATE CITY OF BUCKHOLTS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS BUCKHOLTS
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 72 of 178
291
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2262 080.65457 9,588
INSTALL 1371 FEET OF 4 INCH POLY AND 4822 FEET OF 2 INCH POLY ALONG THE
STREETS OF WOLF RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH NOVEMBER
2263 080.65461 739
RELOCATE FACILITIES. ABANDON 174 FEET OF 2 INCH STEEL AND 293 FEET OF 2
INCH POLY ALONG 16TH STREET TO ACCOMMODATE CITY OF BROWNWOOD
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD
RELOCATION OF
FACILITIES OCTOBER
2264 080.65462 4,695
INSTALL 831 FEET OF 2 INCH POLY AND ABANDON 450 FEET OF 2 INCH STEEL
ALONG NORTH COLLEGE STREET IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY OCTOBER
2265 080.65485 4,312
RELOCATE FACILILTIES. INSTALL 950 FEET OF 2 INCH POLY ALONG ALLEY OF
LOMA AND ABANDON 940 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
2266 080.65486 107,444
INSTALL 6850 FEET OF 6 INCH POLY ALONG LONE STAR DRIVE AND ABANDON 330
FEET OF 2 INCH, 6275 FEET OF 3 INCH AND 845 FEET OF 4 INCH IP POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2267 080.65488 24
ABANDON 15 FEET OF 4 INCH STEEL AND 18 FEET OF 6 INCH POLY AND DISTRICT
REGULATOR STATION 04 IN BRYAN IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
2268 080.65496 (5)
ABANDON DISTRICT REGULATOR STATION ALONG JIM MILLER AND DAY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2269 080.65498 27,257
INSTALL AND ABANDON S203 DRS IN THE FOLLOWING LOCATIONS: DRS02 AND
DRS03 IN PUTNAM IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE
8.209. ALL CUSTOMERS PUTNAM SYSTEM INTEGRITY OCTOBER
2270 080.65502 49,693
INSTALL AND ABANDON DISTRICT REGULATOR STATIONS AT DRS08, DRS09,
DRS10, DRS11, AND DRS12 IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION
RULE 8.209. ALL CUSTOMERS DUBLIN SYSTEM INTEGRITY OCTOBER
2271 080.65506 111
ABANDON DISTRICT REGULATOR STATION #119 IN DALLAS, DALLAS COUNTY AS
PART OF THE AREA REPLACEMENT PROJECT AR ID#2145.1 IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2272 080.65508 17
ABANDON DISTRICT REGULATOR STATION #110 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2273 080.65510 225
INSTALL 296 FEET OF 2 INCH POLY AND ABANDON 219 FEET OF 2 INCH STEEL
AND 69 FEET OF 2 INCH POLY ALONG LOCUST STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PETROLIA SYSTEM INTEGRITY OCTOBER
2274 080.65511 1,532
INSTALL 57 FEET OF 16 INCH STEEL AND ABANDON 57 FEET OF 16 INCH STEEL
ALONG WEST PIPELINE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY OCTOBER
2275 080.65514 1,689
RELOCATE FACILITIES. INSTALL 333 FEET OF 4 INCH POLY AND ABANDON 140
FEET OF 4 INCH STEEL AND 180 FEET OF 4 INCH POLY ALONG GREEK ROW DRIVE
TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
2276 080.65515 21,942
INSTALL AND ABANDON S203 DRS IN THE FOLLOWING LOCATIONS: DRS01 IN
SANTA ANNA, DRS01 IN VALERA, DRS01 IN TALPA IN ACCORDANCE WITH TEXAS
RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS SANTA ANNA SYSTEM INTEGRITY OCTOBER
2277 080.65516 4,287
INSTALL DISTRICT REGULATOR STATION 012 IN CISCO, 01 IN MORAN, 02 IN CLYDE,
02 IN TRENT AND 02 IN CARBON AND ABANDON DISTRICT REGULATOR STATION
012 IN CISCO, 01 IN MORAN, 02 IN CLYDE, 02 IN TRENT AND 02 IN CARBON IN
ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS CARBON SYSTEM INTEGRITY OCTOBER
2278 080.65517 4,875
RELOCATE FACILITIES. INSTALL 305 FEET OF 4 INCH POLY AND ABANDON 305
FEET OF 4 INCH POLY ALONG WADE BOULEVARD TO ACCOMMODATE CITY OF
FRISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
RELOCATION OF
FACILITIES OCTOBER
2279 080.65519 22,206
INSTALL AND ABANDON DISTRICT REGLUATOR STATIONS: DRS02 IN IREDELL,
DRS09 IN HAMILTON AND DRS04 IN COMANCHE IN ACCORDANCE WITH TEXAS
RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS HAMILTON SYSTEM INTEGRITY OCTOBER
2280 080.65527 66,172
RELOCATE FACILITIES. INSTALL 860 FEET OF 8 INCH, ALONG GREAT OAKS STREET
AND ABANDON 644 FEET OF 8 INCH POLY AND 225 FEET OF 8 INCH STEEL TO
ACCOMMODATE CITY OF BRUSHY CREEK STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRUSHY CREEK
RELOCATION OF
FACILITIES OCTOBER
2281 080.65529 7,656
INSTALL AND ABANDON DRS IN THE FOLLOWING LOCATION: DRS13 IN COLORADO
CITY IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS COLORADO CITY SYSTEM INTEGRITY OCTOBER
2282 080.65530 18,966
INSTALL AND ABANDON S203 DRS IN THE FOLLOWING LOCATIONS: DRS11 IN
STAMFORD AND DRS03 IN LUEDERS IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY OCTOBER
2283 080.65534 118,735
RELOCATE FACILITIES. INSTALL 2717 FEET OF 4 INCH POLY AND ABANDON 3111
FEET OF 2 INCH POLY ALONG HIDDEN CREEK ROAD AND MERRYMOUNT ROAD TO
ACCOMMODATE CITY OF WESTOVER HILLS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTOVER HILLS
RELOCATION OF
FACILITIES OCTOBER
2284 080.65542 174
INSTALL FLOW SAFE RELIEF VALVE AT REGULATOR STATION IN SUNNYVALE AND
ABANDON ONE GROVE 83 RELIEF VALVES AT DISTRICT REGULATOR STATION #01
IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS SUNNYVALE SYSTEM INTEGRITY OCTOBER
2285 080.65545 13,346
INSTALL 125 FEET OF 2 INCH POLY AND 500 FEET OF 6 INCH POLY AND ABANDON
100 FEET OF 2 INCH STEEL AND 44 FEET OF 2 INCH POLY AND 397 FEET OF 6 INCH
POLY ALONG HARVEY ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY OCTOBER
2286 080.65546 6,411
INSTALL 2100 FEET OF 4 INCH POLY ALONG DENNIS LANE AND ABANDON 1785
FEET OF 4 INCH STEEL AND 315 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY OCTOBER
2287 080.65548 386
RELOCATE FACILITIES. INSTALL 404 FEET OF 2 INCH POLY AND ABANDON 404
FEET OF 2 INCH POLY ALONG FOREST PARK BOULEVARD TO ACCOMMODATE CITY
OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2288 080.65551 3,803
RELOCATE FACILITIES. INSTALL 750 FEET OF 2, 4, AND 6 INCH POLY ALONG DOVER
LANE AND ABANDON 750 FEET OF 2, 4, AND 6 INCH POLY TO ACCOMMODATE
RICHLAND HILLS STREET PAVING PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS
RELOCATION OF
FACILITIES OCTOBER
2289 080.65558 (19,718)
INSTALL RELIEF VALVE AND ABANDON RELIEF VALVE ALONG JACKSON STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
2290 080.65563 533
RELOCATE FACILITIES. INSTALL 310 FEET OF 2 INCH POLY AND ABANDON 445
FEET OF 2 INCH POLY ALONG BRIDGE STREET TO ACCOMMODATE CITY OF WACO
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
2291 080.65564 44,129
INSTALL 1397 FEET OF 4 INCH POLY AND ABANDON 978 FEET OF 4 INCH STEEL
AND 178 FEET OF 4 INCH POLY AND 11 FEET OF 6 INCH STEEL ALONG MODLIN
AVENUE AND MATTISON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2292 080.65565 202,995
FUNCTIONAL PROJECT COVERING THE REPLACEMENT OF MAINS AND SERVICE
LINES IN CISCO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY OCTOBER
2293 080.65570 2,200
INSTALL 268 FEET OF 6 INCH STEEL AND ABANDON 246 FEET OF 6 INCH STEEL
ALONG ROGERS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ROGERS SYSTEM INTEGRITY OCTOBER
2294 080.65582 14
INSTALL 270 FEET OF 2 INCH POLY AND ABANDON 270 FEET OF 2 INCH STEEL
AND 184 FEET OF 2 INCH POLY ALONG JACKSBORO HIGHWAY IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 73 of 178
292
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2295 080.65588 155
ABANDON 257 FEET OF STEEL AND 25 FEET OF POLY AND DISTRICT REGULATOR
STATION ALONG AVENUE C IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS KILLEEN SYSTEM INTEGRITY OCTOBER
2296 080.65593 51,242
INSTALL REGULATOR AND RELIEF VALVE ALONG DRS324 AND ABANDON
REGULATOR AND RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2297 080.65620 3,848
RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY AND ABANDON 400
FEET OF 4 INCH POLY ALONG FM 1417 AT SFBN CROSSING TO ACCOMMODATE
THE CITY OF SHERMAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
RELOCATION OF
FACILITIES OCTOBER
2298 080.65621 7,390
RELOCATE FACILITIES. INSTALL 408 FEET OF 8 INCH STEEL AND ABANDON 375
FEET OF 8 INCH STEEL ALONG US 75 AT BNSF CROSSING TO ACCOMMODATE CITY
OF SHERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
RELOCATION OF
FACILITIES OCTOBER
2299 080.65627 15,798
INSTALL DISTRICT REGULATOR STATION IN MOODY AND ABANDON DISTRICT
REGULATOR STATION DRS03 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MOODY SYSTEM INTEGRITY OCTOBER
2300 080.65642 11,224
INSTALL AND ABANDON S203 DRS IN THE FOLLOWING LOCATIONS: DRS01 & DRS02
IN BELLEVUE, DRS01 IN OKLAUNION, DRS10 IN PETROLIA, AND DRS09 IN ELECTRA
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELLEVUE SYSTEM INTEGRITY OCTOBER
2301 080.65644 20,165
RELOCATE FACILITIES. INSTALL 118 FEET OF 4 INCH POLY AND 663 FEET OF 6
INCH POLY AND ABANDON 118 FEET OF 4 INCH POLY AND 663 FEET OF 6 INCH
POLY ALONG HOLLAND ROAD TO ACCOMMODATE CITY OF MANSFIELD STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD
RELOCATION OF
FACILITIES OCTOBER
2302 080.65646 30,883
RELOCATE FACILITIES. INSTALL 1084 FEET OF 4 INCH POLY AND 367 FEET OF 6
INCH POLY AND ABANDON 155 FEET OF 4 INCH STEEL AND 1199 FEET OF 4 INCH
POLY TO ACCOMMODATE CITY OF TERRELL STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL
RELOCATION OF
FACILITIES OCTOBER
2303 080.65647 6,275
INSTALL 230 FEET OF 2 INCH POLY AND 25 FEET OF 4 INCH POLY AND DISTRICT
REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION AND 200
FEET OF 3 INCH STEEL ALONG ELM STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ECTOR SYSTEM INTEGRITY OCTOBER
2304 080.65651 4,600
INSTALL AND ABANDON S203 DRS IN THE FOLLOWING LOCATIONS: DRS03 IN
WHITEWRIGHT, DRS02 IN LINDSAY, AND DRS10 IN GAINESVILLE IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LINDSAY SYSTEM INTEGRITY OCTOBER
2305 080.65653 9,858
INSTALL AND ABANDON DISTRICT REGLUATOR STATIONS AT THE FOLLOWING
LOCATIONS: DRS045 AND DRS084 IN WICHITA FALLS, DRS33 IN OLNEY, AND DRS01
AND DRS08 IN ARCHER CITY. IN ACCORDANCE WITH THE TEXAS RAILROAD
COMMISSION RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2306 080.65655 16,049
INSTALL DISTRICT REGULATOR STATION 01 AND 03 IN CADDO MILLS, 11 IN
SULPHUR SPRINGS AND 01 IN CUMBY IN ACCORDANCE WITH TEXAS RAILROAD
COMMISSION RULE 8.209. ALL CUSTOMERS CUMBY SYSTEM INTEGRITY OCTOBER
2307 080.65657 1,147
INSTALL 3875 FEET OF 2 INCH POLY AND 3020 FEET OF 4 INCH POLY ALONG THE
STREETS OF THE MILRANY RANCH SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL MELISSA GROWTH MARCH
2308 080.65659 508
INSTALL 4530 FEET OF 2 INCH POLY ALONG THE STREETS OF ANNA CROSSING
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ANNA GROWTH MARCH
2309 080.65660 32
INSTALL 4195 FEET OF 2 INCH POLY ALONG STREETS OF TOWN PARK. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL PRINCETON GROWTH MARCH
2310 080.65661 86,148
RELOCATE FACILITIES. INSTALL 2945 FEET OF 2 INCH POLY AND ABANDON 2970
FEET OF 2 INCH STEEL ALONG MINOT AVENUE TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2311 080.65672 712
INSTALL 283 FEET OF 4 INCH POLY AND ABANDON 190 FEET OF 2 INCH STEEL
AND 110 FEET OF 2 INCH POLY AND 260 FEET OF 4 INCH STEEL AND 20 FEET OF 4
INCH POLY ALONG ROBERTS ROAD IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2312 080.65673 211
ABANDON 3315 FEET OF 3 INCH POLY ALONG COLLIN CREEK MALL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY OCTOBER
2313 080.65674 246,606
INSTALL TWO NEW LOW PRESSURE DISTRICT REGULATOR STATIONS, 25 FEET OF
2 INCH, 40 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATIONS
FARMERSVILLE DISTRICT REGULATOR STATIONS 11 AND 12, 22 FEET OF 2 INCH
STEEL , 13 FEET OF 4 INCH STEEL 10 FEET OF 4 INCH POLY AND 13 FEET OF 4
INCH STEEL MAIN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY JUNE
2314 080.65678 7,460
INSTALL AND ABANDON S203 DISTRICT REGULATOR STATION IN MILFORD TEXAS
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILFORD SYSTEM INTEGRITY OCTOBER
2315 080.65679 15,821
INSTALL AND ABANDON S203 DISTRICT REGULATOR STATION DRS06 IN MERIDIAN
IN ACCORDANCE WITH THE TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS MERIDIAN SYSTEM INTEGRITY OCTOBER
2316 080.65681 53,398
RELOCATE FACILITIES. INSTALL 160 FEET OF 8 INCH STEEL AND 430 FEET OF 2
INCH POLY ALONG NORTHAVEN ROAD AND ABANDON 113 FEET OF 8 INCH STEEL
AND 415 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2317 080.65682 35
ABANDON DISTRICT REGULATOR STATION 168 IN FORT WORTH IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2318 080.65683 720
INSTALL 602 FEET OF 2 INCH POLY AND ABANDON 80 FEET OF 4 INCH STEEL AND
300 FEET OF 4 INCH POLY ALONG LOVERS LANE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE SYSTEM INTEGRITY OCTOBER
2319 080.65690 7,650
INSTALL AND ABANDON DISTRICT REGULATOR STATIONS AT THE FOLLOWING
LOCATIONS: DRS33 IN TEMPLE IN ACCORDANCE WITH THE TEXAS RAILROAD
COMMISSION RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER
2320 080.65694 2,746
RELOCATE FACILITIES. INSTALL 10 FEET OF 2 INCH POLY AND 710 FEET OF 4 INCH
POLY AND ABANDON 10 FEET OF 2 INCH POLY AND 10 FEET OF 4 INCH STEEL AND
700 FEET OF 4 INCH POLY ALONG CARDINAL LANE TO ACCOMMODATE CITY OF
NORTH RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTH RICHLAND HILLS
RELOCATION OF
FACILITIES OCTOBER
2321 080.65695 2,892
RELOCATE FACILITIES. INSTALL 35 FEET OF 4 INCH POLY AND 135 FEET OF 6 INCH
AND ABANDON 45 FEET OF 4 INCH POLY 30 FEET OF 4 INCH AND 160 FEET OF 6
INCH STEEL ALONG WEST BROADWAY AVENUE AT TRAVIS AVENUE TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2322 080.65697 (8,556)
REPLACE (4) DISTRICT REGUATOR STATIONS IN SAGINAW IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY OCTOBER
2323 080.65704 494,776
INSTALL NEVADA DISTRICT REGULATOR STATION #2, FATE DISTRICT REGULATOR
STATION #1 AND FORNEY DISTRICT REGULATOR STATION #6. REPLACE NEVADA
DISTRICT REGULATOR STATION #2, FATE DISTRICT REGULATOR STATION #1 AND
FORNEY DISTRICT REGULATOR STATION #6 ALL CUSTOMERS NEVADA SYSTEM INTEGRITY JULY
2324 080.65705 204
RELOCATE FACILITIES. INSTALL 118 FEET OF 6 INCH POLY AND ABANDON 89
FEET OF 6 INCH POLY ALONG OLD BURLESON ROAD TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2325 080.65706 13,575
RELOCATE FACILITIES. INSTALL 600 FEET OF 6 INCH POLY AND ABANDON 350
FEET OF 6 INCH STEEL ALONG RISINGER ROAD TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 74 of 178
293
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2326 080.65707 102,063
RELOCATE FACILITIES. INSTALL 455 FEET OF 6 INCH AND 2260 FEET OF 12 INCH
POLY ALONG RISINGER ROAD FROM INTERSTSTE 35W TO TECHNOLOGY
BOULEVARD AND ABANDON 132 FEET OF 6 INCH STEEL AND 2062 FEET OF 6 INCH
POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2327 080.65731 267
ABANDON 361 FEET OF 2 INCH STEEL AND 40 FEET OF 2 INCH POLY ALONG
CHAPPELL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NEWCASTLE SYSTEM INTEGRITY OCTOBER
2328 080.65744 867,349
INSTALL DISTRICT REGULATOR STATIONS #010, #011, #017, AND #067A ALONG THE
STREETS OF ABILENE AND ABANDON DISTRICT REGULATOR STATIONS #010, #011,
#017, AND #067A. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
2329 080.65747 6,003
INSTALL 925 FEET OF 4 INCH POLY ALONG NORTH STREET AND ABANDON 925
FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.208. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER
2330 080.65749 47,385
INSTALL 3 FEET OF 3 INCH POLY AND 1236 FEET OF 4 INCH POLY AND ABANDON
1130 FEET OF 4 INCH POLY ALONG LINDALE LANE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY OCTOBER
2331 080.65754 10,618
RELOCATE FACILITIES. INSTALL 2750 FEET OF 2 INCH POLY AND ABANDON 1217
FEET OF 2 INCH STEEL, 444 FEET OF 2 INCH POLY, 782 FEET OF 1.25 INCH STEEL,
AND 585 FEET OF 3 INCH STEEL AND 1 DRS ALONG WAYLAND AND SUNSET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER
RELOCATION OF
FACILITIES OCTOBER
2332 080.65774 409
RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY AND ABANDON 350
FEET OF 4 INCH STEEL ALONG NORTH COLEMAN TO ACCOMMODATE CITY OF
PROSPER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PROSPER
RELOCATION OF
FACILITIES OCTOBER
2333 080.65779 1,736
INSTALL 840 FEET OF 4 INCH AND 2400 FEET OF 2 INCH POLY ALONG THE STREETS
OF THE STANDARD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH JULY
2334 080.65786 232
INSTALL 990 FEET OF 8 INCH, 820 FEET OF 4 INCH, AND 6230 FEET OF 2 INCH POLY
ALONG THE STREETS OF CARMEL SUBDIVISON. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH MARCH
2335 080.65787 8,169
RELOCATE FACILITIES. INSTALL 780 FEET OF 4 INCH AND 37 FEET OF 6 INCH POLY
AND ABANDON 221 FEET OF 2 INCH STEEL, 287 FEET OF 2 INCH POLY, 268 FEET OF
3 INCH POLY AND 20 FEET OF 6 INCH POLY ALONG SOUTH BOUND FRONTAGE OF
IH35 TO ACCOMMODATE TXDOT PROJECT. ALL CUSTOMERS GEORGETOWN
RELOCATION OF
FACILITIES APRIL
2336 080.65795 139,277
INSTALL 1500 FEET OF 2 INCH; POLY ALONG IOOF STREET AND ABANDON 1020
FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY JULY
2337 080.65802 25,309
INSTALL DISTRICT REGULATOR STATION 05 ALONG THE STREETS OF
BROWNWOOD AND ABANDON DISTRICT REGULATOR 02 AND DISTRICT
REGULATOR STATION 05 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER
2338 080.65803 6,298
INSTALL DISTRICT REGULATOR STATION 02 AND ABANDON DISTRICT REGULATOR
STATION 02 ALONG ATCHILEY STREET IN THE TOWN OF ALVARADO IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALVARADO SYSTEM INTEGRITY OCTOBER
2339 080.65804 51,099
INSTALL DISTRICT REGULATOR STATION IN CLEBURNE AND ABANDON DISTRICT
REGULATOR STATION 06, 09, 26, 13, 05, 17 IN ACCORDANCE WITH TEXAS
RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER
2340 080.65805 449,815
INSTALL WESTMINISTER DISTRICT REGULATOR STATION # 1, ANNA DISTRICT
REGULATOR STATION #3, ANNA DISTRICT REGULATOR STATION #5, 30 FEET OF 2
INCH POLY, 70 FEET OF 4 INCH POLY AND ABANDON WESTMINISTER DISTRICT
REGULATOR STATION #1, ANNA DISTRICT REGULATOR STATION #3, ANNA
DISTRICT REGULATOR STATION #5, 28 FEET OF 2 INCH STEEL, 10 FEET OF 3 INCH
STEEL, 19 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANNA SYSTEM INTEGRITY SEPTEMBER
2341 080.65806 12,122
INSTALL DISTRICT REGULATOR STATION IN AND CORSICANA AND ABANDON
DISTRICT REGULATOR STATION DRS07 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
2342 080.65807 45,513
INSTALL DISTRICT REGULATOR STATIONS 01,02,03,10 AND ABANDON FOUR
DISTRICT REGULATOR STATIONS 01,02,03,10 ALONG THE STREETS OF PALESTINE
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE SYSTEM INTEGRITY OCTOBER
2343 080.65810 23,688
INSTALL AND ABANDON DISTRICT REGULATOR STATIONS #01, #05,#12,#25 AND #26
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
2344 080.65812 14,176
INSTALL DISTRICT REGULATOR STATIONS DRS29, DRS47, DRS50,DRS03 AND
DRS16 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY OCTOBER
2345 080.65813 8,887
INSTALL DISTRICT REGULATOR STATION IN CHILDRESS AND QUANAH AND
ABANDON DISTRICT REGULATOR STATION DRS03, DRS08, DRS06,DRS12 IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER
2346 080.65815 7,549
INSTALL DISTRICT REGULATOR STATION IN WICHITA AND ABANDON DISTRICT
REGULATOR STATION DRS08, DRS66, DRS007 AND DRS121 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2347 080.65816 25,885
INSTALL (4) DISTRICT REGULATOR STATION ALONG STREETS OF CLARKSVILLE
AND 300 FEET OF 4 INCH POLY, 100 FEET OF 2 INCH POLY AND ABANDON 45 FEET
OF 3 INCH, 25 FEET OF 3 INCH, 30 FEET OF 4 INCH STEEL, 25 FEET OF 4 INCH POLY,
25 FEET OF 4 INCH STEEL, 10 FEET OF 3 INCH STEEL, DRS 01, 06, 08, AND 10 IN
CLARKSVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CLARKSVILLE SYSTEM INTEGRITY OCTOBER
2348 080.65817 12,769
INSTALL DISTRICT REGULATOR STATIONS ALONG THE STREETS OF COLORADO
CITY AND ABANDON DISTRICT REGULATOR STATIONS 02, 03, 10 AND 11 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLORADO CITY SYSTEM INTEGRITY OCTOBER
2349 080.65818 19,858
INSTALL DISTRICT REGULATOR STATION IN COMMERCE AND GREENVILLE AND
ABANDON DISTRICT REGULATOR STATION 01, 02, 04, 05 AND 06 IN ACCORDANCE
WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY OCTOBER
2350 080.65819 14,340
INSTALL DISTRICT REGULATOR STATION IN GREENVILLE AND ABANDON DISTRICT
REGULATOR STATION 08, 09, 25, 28 IN ACCORDANCE WITH TEXAS RAILROAD
COMMISSION RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY OCTOBER
2351 080.65820 68,846
INSTALL DISTRICT REGULATOR STATION, 422 FEET OF 2 INCH POLY, AND 708 FEET
OF 4 INCH POLY IN SULPHUR SPRINGS AND ABANDON DISTRICT REGULATOR
STATION 03, 09, 13 AND 14 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY OCTOBER
2352 080.65821 295,680
INSTALL DISTRICT REGULATOR STATION 07, 11 12 AND ABANDON DISTRICT
REGULATOR STATION 07, 11, 12 ALONG THE STREETS OF DENTON IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER
2353 080.65825 9,691
INSTALL 885 FEET OF 4 INCH AND 2133 FEET OF 2 INCH POLY ALONG THE STREETS
OF SADDLECREEK PHASE 12. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
2354 080.65826 107,948
INSTALL 3030 FEET OF 2 INCH POLY ALONG DIVIDEND DRIVE AND ABANDON 3020
FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
2355 080.65829 12,374
RELOCATE FACILITIES. INSTALL 900 FEET OF 4 INCH POLY AND ABANDON 890
FEET OF 4 INCH STEEL ALONG HOWARD ST TO ACCOMMODATE THE CITY OF
ROYSE CITY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ROYSE CITY
RELOCATION OF
FACILITIES OCTOBER
2356 080.65830 481
RELOCATE FACILITIES. INSTALL 280 FEET OF 4 INCH POLY AND ABANDON 42
FEET OF 4 INCH STEEL AND 220 FEET OF 4 INCH POLY ALONG CLARKSVILLE TO
ACCOMMODATE CITY OF PARIS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 75 of 178
294
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2357 080.65838 4,131
RELOCATE FACILITIES. INSTALL 504 FEET OF 2 INCH POLY AND 114 FEET OF 4
INCH POLY AND ABANDON 469 FEET OF 2 INCH STEEL AND 16 FEET OF 2 INCH
POLY AND 15 FEET OF 4 INCH STEEL AND 85 FEET OF 4 INCH POLY ALONG
CURZON AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2358 080.65841 6,100
INSTALL DISTRICT REGULATOR STATION IN GLEN ROSE AND ABANDON DISTRICT
REGULATOR STATION DRS07 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GLEN ROSE SYSTEM INTEGRITY OCTOBER
2359 080.65842 351,845
INSTALL DISTRICT REGULATOR STATION IN GRAPEVINE AND ABANDON DISTRICT
REGULATOR STATION #01, #04, AND #07. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER
2360 080.65844 10,132
INSTALL DISTRICT REGULATOR STATION 02 IN MOODY AND HUTTO AND ABANDON
DISTRICT REGULATOR STATION 02 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HUTTO SYSTEM INTEGRITY OCTOBER
2361 080.65845 1,488
RELOCATE FACILITIES. INSTALL 75 FEET OF 4 INCH AND 75 FEET OF 2 INCH POLY
ALONG FM 1633 AND ABANDON 75 FEET OF 4 INCH STEEL AND 75 FEET OF 2 INCH
POLY TO ACCOMMODATE TXDOT ROAD IMPROVEMENT PROJECT IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA
RELOCATION OF
FACILITIES OCTOBER
2362 080.65851 118,141
INSTALL 1450 FEET OF 4 INCH AND 950 FEET OF 2 INCH POLY AND ABANDON 1700
FEET OF 4 INCH AND 700 FEET OF 2 INCH STEEL ALONG SMITH STREET IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY OCTOBER
2363 080.65852 1,895
INSTALL DISTRICT REGULATOR STATION 06 AND ABANDON DISTRICT REGULATOR
STATION 06 ALONG MESQUITE STREET IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA SYSTEM INTEGRITY OCTOBER
2364 080.65853 6,736 INSTALL AND ABANDON DISTRICT REGULATOR 02 IN MART. ALL CUSTOMERS MART SYSTEM INTEGRITY OCTOBER
2365 080.65854 5,976
INSTALL DISTRICT REGULATOR STATION 12 IN WACO AND ABANDON DISTRICT
REGULATOR STATION 12 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
2366 080.65857 13,524
INSTALL DISTRICT REGULATOR STATION 18 IN WACO AND ABANDON DISTRICT
REGULATOR STATION 18 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
2367 080.65858 543,218
INSTALL DISTRICT REGULATOR STATION #04, #11, #13. #14 ALONG THE STREETS
OF SAN ANGELO AND ABANDON DISTRICT REGULATOR STATION #04, #11, #13. #14
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY JUNE
2368 080.65859 551
INSTALL 293 FEET OF 4 INCH POLY AND ABANDON 33 FEET OF 2 INCH STEEL AND
215 FEET OF 2 INCH POLY AND 249 FEET OF 4 INCH STEEL AND 38 FEET OF 4 INCH
POLY ALONG BUCHANAN IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2369 080.65862 525,309
INSTALL DISTRICT REGULATOR STATION #15, #43, #52. #62, #81 ALONG THE
STREETS OF SAN ANGELO AND ABANDON DISTRICT REGULATOR STATION #15,
#43, #52. #62, #81 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY SEPTEMBER
2370 080.65863 15,290
INSTALL DISTRICT REGULATOR STATIONS 55, 10, 16, 09, 46 AND ABANDON
DISTRICT REGULATOR STATIONS 55, 10, 16, 09, 46 ALONG THE STREETS OF SAN
ANGELO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
2371 080.65865 175,054
INSTALL DISTRICT REGULATOR STATION #20 AND 270 FEET OF 4 INCH POLY
ALONG CHURCH STREET AND ABANDON DISTRICT REGULATOR STATION #20 AND
260 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY JULY
2372 080.65877 48
ABANDON DISTRICT REGULATOR STATION 104 IN FORT WORTH IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2373 080.65879 81,762
RELOCATE FACILITIES. INSTALL 2200 FEET OF 4 INCH AND 350 FEET OF 2 INCH
POLY ALONG SH78 AND ABANDON 1190 FEET OF 4 INCH AND 780 FEET OF 6 INCH
STEEL TO ACCOMMODATE TXDOT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2374 080.65885 128,243
INSTALL 1658 FEET OF 8 INCH POLY AND ABANDON 1344 FEET OF 3 INCH STEEL
AND REPLACE DISTRICT REGULATOR STATION ALONG BRUCE ROAD IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GODLEY SYSTEM INTEGRITY DECEMBER
2375 080.65887 6,853
INSTALL 280 FEET OF 2 INCH POLY AND 1050 FEET OF 4 INCH POLY AND ABANDON
166 FEET OF 2 INCH POLY AND 558 FEET OF 4 INCH STEEL AND 80 FEET OF 4 INCH
CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND SYSTEM INTEGRITY OCTOBER
2376 080.65896 1,204
ABANDON DISTRICT REGULATOR STATION 01 AND 346 FEET OF 6 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY OCTOBER
2377 080.65901 14,697
RELOCATE FACILITIES. INSTALL 953 FEET OF 2 INCH POLY AND 4 FEET OF 4 INCH
POLY AND ABANDON 955 FEET OF 2 INCH STEEL ALONG ALTA VIEW STREET FROM
KIMBO RD TO PREMIER STREET TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2378 080.65902 22,149
RELOCATE FACILITIES. INSTALL 2395 FEET OF 2 INCH POLY AND ABANDON 1410
FEET OF 2 INCH STEEL ALONG KIMBO ROAD FROM MESQUITE RD TO EAST END
CUL DE SAC TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2379 080.65904 654
INSTALL 65 FEET OF 4 INCH AND 245 FEET OF 6 INCH POLY ALONG WEST AVENUE
B AND ABANDON 65 FEET OF 3 INCH AND 200 FEET OF 6 INCH STEEL AND 40 FEET
OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER
2380 080.65910 1,552
INSTALL 279 FEET OF 2 INCH POLY AND 251 FEET OF 4 INCH POLY AND ABANDON
279 FEET OF 2 INCH STEEL AND 177 FEET OF 3 INCH STEEL AND 70 FEET OF 4 INCH
STEEL ALONG CYPRESS STREET IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GROESBECK SYSTEM INTEGRITY OCTOBER
2381 080.65917 358
INSTALL 224 FEET OF 2 INCH POLY AND ABANDON 224 FEET OF 2 INCH POLY
ALONG WOODBINE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND SYSTEM INTEGRITY OCTOBER
2382 080.65918 9,751
RELOCATE FACILITIES. INSTALL 1,070 FEET OF 2 INCH POLY ALONG HOUSTON (FM
56) MAXEY AND ABANDON 260 FEET OF 4 INCH AND 600 FEET OF 2 INCH STEEL
AND 417 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
RELOCATION OF
FACILITIES OCTOBER
2383 080.65919 12,716
RELOCATE FACILITIES. INSTALL 120 FEET OF 4 INCH POLY AND ABANDON 260
FEET OF 2 INCH POLY ALONG HAIRY MAN ROAD TO ACCOMMODATE CITY OF
ROUND ROCK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
RELOCATION OF
FACILITIES OCTOBER
2384 080.65921 14,989
INSTALL 3004 FEET OF 2 INCH POLY AND ABANDON 2171 FEET OF 2 INCH STEEL
AND 339 FEET OF 2 INCH POLY AND 190 FEET OF 6 INCH STEEL AND 63 FEET OF 6
INCH POLY ALONG SOUTH 20TH STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
2385 080.65930 1,438
INSTALL 260 FEET OF 4 INCH POLY AND 2 FEET OF 6 INCH POLY AND ABANDON
131 FEET OF 2 INCH STEEL AND 8 FEET OF 6 INCH POLY AND 155 FEET OF 8 INCH
STEEL ALONG MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2386 080.65955 215
ABANDON (1) DISTRICT REGULATOR STATION ALONG KNOX ST STREET IN THE
TOWN OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2387 080.65956 42,435
RELOCATE FACILITIES. INSTALL 1721 FEET OF 4 INCH POLY AND ABANDON 197
FEET OF 3 INCH STEEL AND 1621 FEET OF 4 INCH STEEL ALONG PARK HILL DRIVE
TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2388 080.65962 455
INSTALL (2) CLOCKSPRINGS AT DFW AIRPORT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 76 of 178
295
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2389 080.65968 78,409
RELOCATE FACILITIES. INSTALL 498 FEET OF 6 INCH POLY AND 229 FEET OF 4
INCH POLY AND ABANDON 503 FEET OF 6 INCH POLY AND 195 FEET OF 3 INCH
POLY ALONG HIGHWAY I35 AND NORTHWEST BLVD TO ACCOMMODATE CITY OF
GEORGETOWN STREET IMPROVEMENT PROJECT. ALL CUSTOMERS GEORGETOWN
RELOCATION OF
FACILITIES JULY
2390 080.65973 38,714
RELOCATE FACILITES. INSTALL 1198 FEET OF 12 INCH POLY AND ABANDON 1230
FEET OF 12 INCH POLY ALONG FRONTIER PARKWAY TO ACCOMMODATE THE CITY
OF CELINA IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CELINA
RELOCATION OF
FACILITIES OCTOBER
2391 080.66000 17,136
INSTALL 1000 FEET OF 12 INCH POLY AND ABANDON 1040 FEET OF 12 INCH STEEL
ALONG WASHINGTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2392 080.66002 14,312
RELOCATE FACILITIES. INSTALL 424 FEET OF 4 INCH POLY AND ABANDON 176
FEET OF 4 INCH STEEL AND 239 FEET OF 4 INCH POLY TO ACCOMMODATE HEB
CONSTRUCTION PROJECT. ALL CUSTOMERS KERRVILLE
RELOCATION OF
FACILITIES FEBRUARY
2393 080.66007 416
RELOCATE FACILITIES. INSTALL 72 FEET OF 2 INCH POLY AND ABANDON 70 FEET
OF 2 INCH POLY TO ACCOMMODATE CITY OF WHITEHOUSE STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WHITEHOUSE
RELOCATION OF
FACILITIES OCTOBER
2394 080.66011 1,928
INSTALL 490 FEET OF 2 INCH POLY AND ABANDON 491 FEET OF 2 INCH STEEL
ALONG OLD HICO ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY OCTOBER
2395 080.66012 4,770
INSTALL 8 INCH RELIEF VALVE IN IRVING AT DRS 4549.1 AND RETIRE RELIEF VALVE
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER
2396 080.66014 1,776
INSTALL 506 FEET OF 4 INCH POLY AND ABANDON 484 FEET OF 2 INCH STEEL
AND 11 FEET OF 3 INCH STEEL ALONG PARRISH STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
2397 080.66016 632
INSTALL 87 FEET OF 6 INCH STEEL AND ABANDON 88 FEET OF 6 INCH STEEL
ALONG LINE U IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY OCTOBER
2398 080.66017 4,852
RELOCATE FACILITIES. INSTALL 1165 FEET OF 2 INCH POLY ALONG HAMILTON
STREET AND ABANDON 796 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF
FARMERSVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE
RELOCATION OF
FACILITIES OCTOBER
2399 080.66023 1,736
RELOCATE FACILITIES. INSTALL 550 FEET OF 4 INCH POLY ALONG LEON AND
ABANDON 570 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF GARLAND
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
2400 080.66029 2,788
INSTALL 500 FEET OF 4 INCH POLY AND ABANDON 500 FEET OF 4 INCH STEEL
ALONG SOUTH GARITTY STREET IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FROST SYSTEM INTEGRITY OCTOBER
2401 080.66030 5,688
INSTALL 151 FEET OF 3 INCH POLY AND 620 FEET OF 4 INCH POLY AND ABANDON
150 FEET OF 3 INCH POLY AND 613 FEET OF 4 INCH POLY ALONG MAIN STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY OCTOBER
2402 080.66031 1,514
RELOCATE FACILITIES. INSTALL 90 FEET OF 2 INCH POLY ALONG HUDNALL FARMS
AND ABANDON 80 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF KELLER
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER
RELOCATION OF
FACILITIES OCTOBER
2403 080.66032 5,935
RELOCATE FACILITIES. INSTALL 80 FEET OF 2 INCH POLY ALONG LOST LAKE DRIVE
AND ABANDON 70 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF KELLER
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER
RELOCATION OF
FACILITIES OCTOBER
2404 080.66034 19,497
RELOCATE FACILITIES. INSTALL 11 FEET OF 4 INCH POLY AND 3963 FEET OF 6
INCH POLY AND ABANDON 2480 FEET OF 4 INCH POLY ALONG REEDER ROAD TO
ACCOMMODATE CITY OF FORNEY STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORNEY
RELOCATION OF
FACILITIES OCTOBER
2405 080.66035 1,069
INSTALL RELIEF VALVE AND ABANDON RELIEF VALVE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER
2406 080.66037 13,305
INSTALL 165 FEET OF 8 INCH STEEL AND ABANDON 165 FEET OF 8 INCH STEEL
ALONG HIGHWAY 222 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS MUNDAY SYSTEM INTEGRITY OCTOBER
2407 080.66038 3,758
INSTALL 540 FEET OF 2 INCH POLY ALONG RIVER AND ABANDON 530 FEET OF 2
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEYMOUR SYSTEM INTEGRITY OCTOBER
2408 080.66041 28,528
INSTALL 767 FEET OF 2 INCH POLY ALONG SOUTH 9TH STREET AND ABANDON 920
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
2409 080.66044 500,164
RELOCATE FACILITIES. INSTALL 1000 FEET OF 30 INCH STEEL ALONG CANADA
DRIVE AND ABANDON 850 FEET OF 30 INCH STEEL TO ACCOMMODATE THE CITY
OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES DECEMBER
2410 080.66058 18,782
INSTALL 1475 FEET OF 4 INCH POLY AND ABANDON 1430 FEET OF 3 INCH STEEL
AND 41 FEET OF 3 INCH POLY ALONG WHALEY STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE SYSTEM INTEGRITY OCTOBER
2411 080.66071 19,039
RELOCATE FACILITIES. INSTALL 40 FEET OF 4 INCH STEEL ALONG WHEATLAND
AND ABANDON 40 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2412 080.66083 307
RELOCATE FACILITIES. INSTALL 20 FEET OF 2 INCH POLY AND ABANDON 10 FEET
OF 2 INCH STEEL ALONG ELM PARK AND MAPLE PARK DRIVE TO ACCOMMODATE
CITY OF RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS
RELOCATION OF
FACILITIES OCTOBER
2413 080.66107 1,383
INSTALL 500 FEET OF 4 INCH POLY ALONG DALLAS STREET AND ABANDON 500
FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS COOPER SYSTEM INTEGRITY OCTOBER
2414 080.66110 56,680
INSTALL 2300 FEET OF 4 INCH POLY ALONG MILITARY PARKWAY AND ABANDON
1700 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2415 080.66113 45,989
RELOCATE FACILITIES. INSTALL 1420 FEET OF 2 INCH POLY AND ABANDON 1314
FEET OF 2 INCH STEEL AND 111 FEET OF 2 INCH POLY ALONG BOMBAY AVENUE
TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2416 080.66125 3,336
RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH POLY AND ABANDON 209
FEET OF 2 INCH STEEL AND 82 FEET OF 3 INCH STEEL AND 195 FEET OF 4 INCH
STEEL ALONG CARROLL TO ACCOMMODATE CITY OF ATHENS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
RELOCATION OF
FACILITIES OCTOBER
2417 080.66131 4,650
RELOCATE FACILITIES. INSTALL NINE 0.75 INCH SERVICE LINES ALONG
CROWNOVER CT TO ACCOMODATE CITY OF DALLAS STREET PROJECT AND
ABANDON NINE 0.75 INCH SERVICE LINES IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2418 080.66135 498
INSTALL 161 FEET OF POLY AND ABANDON 161 FEET OF 2 INCH STEEL ALONG
AVENUE F IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURKBURNETT SYSTEM INTEGRITY OCTOBER
2419 080.66142 858
INSTALL 160 FEET OF 2 INCH POLY AND ABANDON 292 FEET OF 2 INCH STEEL
AND 67 FEET OF 2 INCH POLY ALONG TREMONT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BYERS SYSTEM INTEGRITY OCTOBER
2420 080.66155 43,957
RELOCATE FACILITIES. INSTALL 2246 FEET OF 4 INCH POLY ALONG BELL
BOULEVARD AND ABANDON 1289 FEET OF 2 INCH, 277 FEET OF 4 INCH AND 215
FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF CEDAR PARK ROAD PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR PARK
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 77 of 178
296
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2421 080.66157 172
INSTALL 96 FEET OF 2 INCH POLY AND ABANDON 98 FEET OF 2 INCH STEEL
ALONG FM1085 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS SYLVESTER SYSTEM INTEGRITY OCTOBER
2422 080.66172 3,363
RELOCATE FACILITIES. INSTALL 60 FEET OF 4 INCH POLY AND ABANDON 60 FEET
OF 4 INCH POLY ALONG FM 1633 TO ACCOMMODATE A TXDOT ROAD
IMPROVEMENT PROJECT IN THE CITY OF MEXIA IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA
RELOCATION OF
FACILITIES OCTOBER
2423 080.66179 3,885
INSTALL 995 FEET OF 2 INCH POLY ALONG THE STREETS OF THE NORTH CREEK
SUBDIVISION. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL MELISSA GROWTH JUNE
2424 080.66181 22,505
RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH POLY AND 742 FEET OF 4
INCH POLY AND ABANDON 14 FEET OF 2 INCH STEEL AND 666 FEET OF 3 INCH
STEEL AND 2168 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF EVERMAN
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN
RELOCATION OF
FACILITIES OCTOBER
2425 080.66186 213
INSTALL REGULATOR AND RELIEF VALVE ALONG DRS02 AND ABANDON
REGULATOR AND RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY OCTOBER
2426 080.66209 53,484
RELOCATE FACILITIES. INSTALL 2175 FEET OF 6 INCH STEEL AND ABANDON 1165
FEET OF 6 INCH STEEL ALONG FM 407 TO ACCOMMODATE CITY OF JUSTIN STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS JUSTIN
RELOCATION OF
FACILITIES OCTOBER
2427 080.66212 27,148
INSTALL 2 INCH WORKER MONITOR AND RELIEF VALVE AND ABANDON RELIEF
VALVES ON DISTRICT REGULATOR STATION 08 AND 20 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER
2428 080.66213 16,070
REPLACE DISTRICT REGULATOR STATION 09, 01, 17, 02 AND 246 IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER
2429 080.66214 29
ABANDON 1067 FEET OF 2 INCH POLY, 12 LONG SIDE SERVICE STUBS, AND 19
SHORT SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER
2430 080.66216 1,211
INSTALL 100 FEET OF 4 INCH POLY AND ABANDON 293 FEET OF 4 INCH STEEL
ALONG MCCRACKEN ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
2431 080.66217 336
INSTALL 120 FEET OF 4 INCH POLY AND ABANDON 188 FEET OF 4 INCH STEEL AND
50 FEET OF 6 INCH STEEL ALONG MAIDEN IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER
2432 080.66218 486
INSTALL 15 FEET OF 6 INCH POLY AND ABANDON 10 FEET OF 6 INCH STEEL
ALONG PRAIREVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY OCTOBER
2433 080.66223 285
INSTALL 185 FEET OF 4 INCH POLY AND ABANDON 185 FEET OF 4 INCH STEEL
ALONG DEAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER
2434 080.66224 8,186
INSTALL 1418 FEET OF 4 INCH POLY AND ABANDON 318 FEET OF 3 INCH STEEL
AND 331 FEET OF 3 INCH POLY AND 740 FEET OF 4 INCH STEEL ALONG BOIS D ARC
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSCOE SYSTEM INTEGRITY OCTOBER
2435 080.66229 3,789
RELOCATE FACILITIES. INSTALL 65 FEET OF 2 INCH POLY ALONG OAK DRIVE AND
ABANDON 98 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF KELLER STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS KELLER
RELOCATION OF
FACILITIES OCTOBER
2436 080.66233 2,467 INSTALL CLOCKSPRINGS ALONG LINE CA(3RD). ALL CUSTOMERS FORT WORTH PIPELINE INTEGRITY OCTOBER
2437 080.66238 243
INSTALL 5000 FEET OF 2 INCH POLY ALONG THE STREETS OF THE ARCADIA FARMS
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PRINCETON GROWTH MARCH
2438 080.66244 414
INSTALL 240 FEET OF 2 INCH IP POLY ALONG CAROLINA AND ABANDON 197 FEET
OF 2 INCH STEEL, 946 FEET OF 2 INCH STEEL AND 275 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2439 080.66250 290
ABANDON DRS414 ALONG BISHOP STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2440 080.66252 244
INSTALL 230 FEET OF 2 INCH POLY ALONG POE AND ABANDON 50 FEET OF 1 INCH
STEEL AND DISTRICT REGULATOR STATION 82 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
2441 080.66258 48
ABANDON DRS 303 ALONG SYLVANIA AVENUE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2442 080.66261 50
ABANDON DRS300 ALONG SYLVANIA AVENUE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2443 080.66262 219,627
INSTALL 1487 FEET OF 4 INCH POLY AND ABANDON 158 FEET OF 2 INCH STEEL, 301
FEET OF 2 INCH POLY, 11 FEET OF 4 INCH POLY ALONG LOVE CIRCLE ACROSS
STATE HIGHWAY 199 DUE TO CITY CONFLICT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
2444 080.66272 187
ABANDON 1950 FEET OF 2 INCH STEEL AND 50 FEET OF 4 INCH POLY ALONG
DODSON LAKE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
2445 080.66273 13,842
RELOCATE FACILITIES. INSTALL 1,812 FEET OF 2 INCH POLY ALONG MISTY LANE
AND ABANDON 1,702 FEET OF 2 INCH STEEL AND 110 FEET OF 2 INCH STEEL MAIN
TO ACCOMMODATE THE CITY OF DESOTO DRAINAGE PROJECT IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO
RELOCATION OF
FACILITIES OCTOBER
2446 080.66274 47,722
RELOCATE FACILITIES. INSTALL 978 FEET OF 4 INCH POLY AND ABANDON 540
FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY AND 302 FEET OF 6 INCH
STEEL ALONG 5TH STREET TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2447 080.66275 7,425
INSTALL 478 FEET OF 2 INCH POLY AND 829 FEET OF 4 INCH POLY AND ABANDON
262 FEET OF 2 INCH POLY AND 829 FEET OF 4 INCH STEEL AND 65 FEET OF 4 INCH
POLY ALONG GRAND AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY OCTOBER
2448 080.66277 48
ABANDON DRS165 ALONG YATES STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2449 080.66279 8,082
INSTALL 300 FEET OF 2 INCH POLY ALONG WILLIAMS RANCH ROAD AND ABANDON
430 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER
2450 080.66284 3,084
ABANDON DIAPHRAGM METER AND REPLACE STATION PIPING ALONG HIDDEN
CREEK PARKWAY AT MEASUREMENT STATION 4528A IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY OCTOBER
2451 080.66295 12,797
RELOCATE FACILITIES. INSTALL 730 FEET OF 6 INCH POLY ALONG LEONARD DRIVE
AND ABANDON 725 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF ANNA
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANNA
RELOCATION OF
FACILITIES OCTOBER
2452 080.66297 959
RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY AND ABANDON 311
FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF SAN ANGELO STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
RELOCATION OF
FACILITIES OCTOBER
2453 080.66298 41,018
INSTALL 1532 FEET OF 4 INCH POLY AND ABANDON 813 FEET OF 2 INCH STEEL
AND 20 FEET OF 2 INCH POLY AND 1498 FEET OF 3 INCH STEEL ALONG BALDRIGE
DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE SYSTEM INTEGRITY OCTOBER
2454 080.66299 4,626
RELOCATE FACILITIES. INSTALL 483 FEET OF 2 INCH POLY AND 454 FEET OF 4
INCH POLY AND 213 FEET OF 6 INCH POLY AND ABANDON 259 FEET OF 2 INCH
STEEL AND 269 FEET OF 2 INCH POLY AND 9 FEET OF 3 INCH STEEL AND 432 FEET
OF 3 INCH POLY AND 201 FEET OF 4 INCH STEEL ALONG LEWIS STREET TO
ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 78 of 178
297
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2455 080.66301 81,711
RELOCATE FACILITIES. INSTALL 180 FEET OF 2 INCH POLY AND 2749 FEET OF 4
INCH POLY AND ABANDON 110 FEET OF 2 INCH STEEL AND 540 FEET OF 2 INCH
POLY AND 110 FEET OF 3 INCH POLY AND 2120 FEET OF 4 INCH STEEL ALONG
PEMBERTON TO ACCOMMODATE CITY OF WHITE SETTLEMENT STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT
RELOCATION OF
FACILITIES OCTOBER
2456 080.66302 84
RELOCATE FACILITIES. INSTALL 28 FEET OF 3 INCH STEEL AND ABANDON 16 FEET
OF 3 INCH STEEL TO ACCOMMODATE CITY OF COMFORT STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMFORT
RELOCATION OF
FACILITIES OCTOBER
2457 080.66312 (2,649)
RELOCATE FACILITIES. INSTALL 375 FEET OF 8 INCH POLY ALONG TXDOT SH 45
FRONTAGE ROAD AND ABANDON 375 FEET OF 8 INCH POLY TO ACCOMMODATE
CITY OF PFLUGERVILLE WASTEWATER LINE PROJECT. ALL CUSTOMERS PFLUGERVILLE
RELOCATION OF
FACILITIES APRIL
2458 080.66328 299
ABANDON DRS178 ALONG EPPS AVENUE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2459 080.66330 103,351
INSTALL 4,000 FEET OF 2 INCH, 250 FEET OF 4 INCH POLY ALONG THE STREETS OF
TOM BRANIFF AND TEXAS PLAZA DRIVE SUBDIVISION IN IRVING. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL IRVING GROWTH DECEMBER
2460 080.66338 75,383
RELOCATE FACILITIES. INSTALL 1500 FEET OF 4 INCH POLY AND 500 FEET OF 8
INCH POLY ALONG ERNIE STREET AND ABANDON 500 FEET OF 3 INCH POLY, 1000
FEET OF 4 INCH STEEL AND 500 FEET OF 8 INCH STEEL TO ACCOMMODATE BNSF
RAILWAY IMPROVEMENTS IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
RELOCATION OF
FACILITIES OCTOBER
2461 080.66373 111,190
RELOCATE FACILITIES. INSTALL 20 FEET OF 20 INCH STEEL AND ABANDON 20 FEET
OF 22 INCH STEEL ALONG LINE D TO ACCOMMODATE CREEK IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2462 080.66376 3,111
INSTALL 445 FEET OF 2 INCH POLY ALONG MILLER PARK AND ABANDON 440 FEET
OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
2463 080.66384 27,703 INSTALL THREE CLOCKSPRINGS ALONG LINE D(DALLAS EAST TO WHITE ROCK). ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2464 080.66391 501
INSTALL RELIEF VALVE ON MARLIN MEASURING STATION AND ABANDON RELIEF
VALVE AT MEASURING STATION. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY OCTOBER
2465 080.66392 82,733
RELOCATE FACILITIES. INSTALL 3500 FEET OF 8 INCH AND 35 FEET OF 2 INCH
POLY ALONG CLIFFORD STREET AND ABANDON 3200 FEET OF 16 INCH AND 165
FEET OF 8 INCH STEEL AND 770 FEET OF 2 INCH POLY TO ACCOMMODATE THE
CITY OF WHITE SETTLEMENT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT
RELOCATION OF
FACILITIES OCTOBER
2466 080.66395 13,534
RELOCATE FACILITIES. INSTALL 474 FEET OF 2 INCH POLY AND ABANDON 385
FEET OF 2 INCH STEEL ALONG FLORENCE ROAD TO ACCOMMODATE CITY OF
SOUTHLAKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE
RELOCATION OF
FACILITIES OCTOBER
2467 080.66398 168
INSTALL 497 FEET OF 2 INCH POLY AND ABANDON 76 FEET OF 2 INCH POLY AND
1938 FEET OF 3 INCH STEEL AND 179 FEET OF 4 INCH POLY ALONG LORD IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY OCTOBER
2468 080.66403 4,067
RELOCATE FACILITIES. INSTALL 775 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY
AND ABANDON 95 FEET OF 2 INCH STEEL AND 1138 FEET OF 2 INCH POLY ALONG
HWY276 TO ACCOMMODATE CITY OF QUINLAN STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUINLAN
RELOCATION OF
FACILITIES OCTOBER
2469 080.66430 11,425
INSTALL 160 FEET OF 8 INCH, 50 FEET OF 2 INCH AND 75 FEET OF 4 INCH POLY
ALONG ABRAMS ROAD AND ABANDON 160 FEET OF 16 INCH, 60 FEET OF 2 INCH
AND 75 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2470 080.66447 33,662
INSTALL 1800 FEET OF 2 INCH POLY ALONG 8TH STREET AND ABANDON 670 FEET
OF 3 INCH, 700 FEET OF 2 INCH STEEL AND 130 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE SYSTEM INTEGRITY OCTOBER
2471 080.66462 1,089
INSTALL 261 FEET OF 4 INCH POLY AND ABANDON 261 FEET OF 4 INCH STEEL
ALONG CARBONDALE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2472 080.66463 53
ABANDON DISTRICT REGULATOR STATION 166 IN FORT WORTH IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2473 080.66479 36,362
INSTALL 1010 FEET OF 4 INCH POLY AND ABANDON 1010 FEET OF 3 INCH STEEL
ALONG FM 1660 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS HUTTO SYSTEM INTEGRITY OCTOBER
2474 080.66490 41
ABANDON 3770 FEET OF 1 INCH STEEL 237 FEET OF 1.25 INCH POLY AND 13 FEET
OF 2 INCH POLY ALONG FM2640 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY OCTOBER
2475 080.66508 66,524
RELOCATE FACILITIES. INSTALL 215 FEET OF 2 INCH POLY AND 1280 FEET OF 4
INCH POLY AND ABANDON 118 FEET OF 2 INCH POLY AND 414 FEET OF 4 INCH
STEEL AND 590 FEET OF 4 INCH POLY ALONG SYCAMORE STREET TO
ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
2476 080.66510 1,907
INSTALL 686 FEET OF 2 INCH POLY AND ABANDON 685 FEET OF 2 INCH STEEL
ALONG I20 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER
2477 080.66557 695,368
RELOCATE FACILITIES. INSTALL 700 FEET OF 12 INCH STEEL ALONG HIGHWAY 80
AND ABANDON 700 FEET OF 12 INCH STEEL TO ACCOMODATE UNION PACIFIC
BRIDGE PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY JUNE
2478 080.66563 15,872
INSTALL 530 FEET OF 4 INCH POLY AND ABANDON 147 FEET OF 4 INCH STEEL
AND 293 FEET OF 4 INCH POLY ALONG BIG BEND IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLEN ROSE SYSTEM INTEGRITY OCTOBER
2479 080.66564 13,928
REPLACE DISTRICT REGULATOR STATION 02 AND 04 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BAIRD SYSTEM INTEGRITY OCTOBER
2480 080.66581 12,245
INSTALL DISTRICT REGULATOR STATION 02,04, AND 05 IN CLYDE AND ABANDON
DISTRICT REGULATOR STATION 02,04, AND 05 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLYDE SYSTEM INTEGRITY DECEMBER
2481 080.66582 5,123
ABANDON DISTRICT REGULATOR STATION #026 IN DALLAS IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2482 080.66583 57,426
RELOCATE FACILITIES. 1000 FEET OF 4 INCH STEEL ALONG MARS DRIVE AND
ABANDON 1000 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WACO IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
2483 080.66584 21,149
INSTALL 22 FEET OF 2 INCH STEEL AND 24 FEET OF 4 INCH STEEL AND 31 FEET OF
10 INCH STEEL AND ABANDON 23 FEET OF 10 INCH STEEL ALONG STREETS OF
HYATT HOTEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY OCTOBER
2484 080.66586 24,906
REPLACE DISTRICT REGULATOR STATION #04, 05, 06 IN COLEMAN AND ABANDON
EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY OCTOBER
2485 080.66597 1,554
INSTALL 120 FEET OF 4 INCH POLY ALONG BENTLEY AND ABANDON 120 FEET OF 4
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER
2486 080.66605 1,648
INSTALL 310 FEET OF 3 INCH AND 180 FEET OF 6 INCH POLY ALONG LEXINGTON
AND ABANDON 310 FEET OF 3 INCH AND 180 FEET OF 8 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER
2487 080.66610 548
INSTALL 80 FEET OF 4 INCH POLY ALONG 21ST STREET AND ABANDON 50 FEET OF
4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
2488 080.66629 48,894
REPLACE DISTRICT REGULATOR STATION 07, 08, 13, AND 14 IN COMANCHE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY OCTOBER
2489 080.66639 12,103
INSTALL 392 FEET OF 2 INCH POLY AND ABANDON 402 FEET OF 2 INCH STEEL
AND 8 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MORAN SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 79 of 178
298
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2490 080.66650 34,999
REPLACE DISTRICT REGULATOR STATION #03, 04 , 05, 07 IN DE LEON AND
ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY OCTOBER
2491 080.66651 1,649
INSTALL TEST STATION AND DECOUPLER ALONG REAGAN BOULEVARD IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEANDER SYSTEM INTEGRITY OCTOBER
2492 080.66653 310
RELOCATE FACILITIES. INSTALL 15 FEET OF 2 INCH POLY ALONG PAIGE DRIVE AND
ABANDON 10 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF THE COLONY
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS THE COLONY
RELOCATION OF
FACILITIES OCTOBER
2493 080.66654 57,044
INSTALL AND ABANDON DISTRICT REGULATOR STATION #03,09, 14, 17 IN GORMAN
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORMAN SYSTEM INTEGRITY OCTOBER
2494 080.66655 2,793
INSTALL 142 FEET OF 4 INCH POLY AND ABANDON 123 FEET OF 4 INCH STEEL AND
7 FEET OF 4 INCH POLY ALONG BUTTERNUT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
2495 080.66656 20,198
INSTALL 1409 FEET OF 2 INCH POLY AND ABANDON 1405 FEET OF 2 INCH STEEL
ALONG PINE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
2496 080.66666 5,380,731
INSTALL 5,100 FEET OF 16 INCH STEEL OF LINE C16 IN EULESS AND ABANDON
5,100 FEET OF 16 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY DECEMBER
2497 080.66668 28,495
RELOCATE FACILITIES. ABANDON 795 FEET OF 4 INCH STEEL AND 100 FEET OF 4
INCH POLY ALONG SILVER CREEK ROAD AND BENNETT STREET TO
ACCOMMODATE CITY OF WHITE SETTLEMENT STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT
RELOCATION OF
FACILITIES OCTOBER
2498 080.66669 44,744
RELOCATE FACILITIES. INSTALL 1462 FEET OF 4 INCH POLY AND ABANDON 1295
FEET OF 4 INCH STEEL ALONG SOUTH HUGHES TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2499 080.66670 89,372
RELOCATE FACILITIES. INSTALL 11 FEET OF 4 INCH POLY AND 2625 FEET OF 6
INCH POLY AND ABANDON 16 FEET OF 4 INCH POLY AND 2620 FEET OF 6 INCH
STEEL ALONG TUMBLEWEED TRAIL TO ACCOMMODATE CITY OF WHITE
SETTLEMENT STREET IMPROVEMENT PROJECT. ALL CUSTOMERS WHITE SETTLEMENT
RELOCATION OF
FACILITIES OCTOBER
2500 080.66671 463
ABANDON DRS179 ALONG BIDDISON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2501 080.66672 32,248
INSTALL 200 FEET OF 4 INCH, 500 FEET OF 2 INCH POLY, DRS 21, DRS 24, DRS 27,
DRS 29, AND DRS 31 AND ABANDON 225 FEET OF 4 INCH POLY, 75 FEET OF 4 INCH
STEEL, 60 FEET OF 2 INCH STEEL AND 25 FEET OF 2 INCH POLY, DRS 21, 24, 27, 29,
AND 31 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER
2502 080.66673 32,337
INSTALL 300 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY, DRS 18, DRS 26, DRS 30
AND DRS 38 AND ABANDON 50 FEET OF 4 INCH STEEL, 25 FEET OF 3 INCH STEEL,
50 FEET OF 2 INCH POLY, DRS 18, DRS 26, DRS 30, AND DRS 38 IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER
2503 080.66675 21
ABANDON DISTRICT REGULATOR STATION 253 ALONG AIRLINE ROAD IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2504 080.66678 10,391
INSTALL 576 FEET OF 4 INCH POLY AND ABANDON 583 FEET OF 2 INCH POLY AND
15 FEET OF 4 INCH STEEL ALONG ARIZONA IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA SYSTEM INTEGRITY OCTOBER
2505 080.66686 1,447
INSTALL 180 FEET OF 2 INCH ALONG AVENUE B AND ABANDON 379 FEET OF 2 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY OCTOBER
2506 080.66692 62,617
RELOCATE FACILITIES. INSTALL 1730 FEET OF 4 INCH POLY AND ABANDON 206
FEET OF 3 INCH STEEL AND 750 FEET OF 4 INCH STEEL AND 818 FEET OF 4 INCH
POLY ALONG JASPER STREET TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2507 080.66696 2,932
INSTALL 295 FEET OF 4 INCH POLY AND ABANDON 293 FEET OF 3 INCH STEEL
ALONG AVENUE B IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER
2508 080.66701 28,090
RELOCATE FACILITIES. INSTALL 994 FEET OF 2 INCH POLY, 3 FEET OF 3 INCH
POLY, AND 460 FEET OF 4 INCH POLY AND ABANDON 940 FEET OF 2 INCH POLY
AND 415 FEET OF 3 INCH STEEL ALONG FAIRFIELD STREET TO ACCOMMODATE
CITY OF BUFFALO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BUFFALO
RELOCATION OF
FACILITIES OCTOBER
2509 080.66704 22,433
RELOCATE FACILITIES. INSTALL 1523 FEET OF 2 INCH POLY AND ABANDON 1425
FEET OF 2 INCH POLY ALONG BROADWAY AVENUE TO ACCOMMODATE CITY OF
EULESS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS
RELOCATION OF
FACILITIES OCTOBER
2510 080.66708 745
INSTALL 180 FEET OF 2 INCH POLY ALONG CRESCENT AND ABANDON 280 FEET OF
4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY OCTOBER
2511 080.66709 9,527
INSTALL AND ABANDON DRS01 AND ABANDON DRS02 IN MILES IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILES SYSTEM INTEGRITY OCTOBER
2512 080.66713 8,955
INSTALL 625 FEET OF 2 INCH AND 320 FEET OF 4 INCH POLY AND ABANDON DRS
STATION 25 AND 334 FEET OF 4 INCH STEEL, 34 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER
2513 080.66715 162
ABANDON 100 FEET OF 1.25 INCH STEEL ALONG HIGHWAY 64 IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TYLER SYSTEM INTEGRITY OCTOBER
2514 080.66717 49,558
INSTALL AND ABANDON DISTRICT REGULATOR STATIONS DRS02, DRS03, DRS04,
DRS14, DRS15, DRS16 IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION
RULE 8.209. ALL CUSTOMERS DUBLIN SYSTEM INTEGRITY OCTOBER
2515 080.66718 90,485
INSTALL 1850 FEET OF 2 INCH AND 1785 FEET OF 4 INCH POLY ALONG
FEATHERSTON STREET AND ABANDON 1780 FEET OF 4 INCH STEEL AND 1420
FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER
2516 080.66726 7,583
INSTALL AND ABANDON DISTRICT REGULATOR STATION #04 IN HICO IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HICO SYSTEM INTEGRITY OCTOBER
2517 080.66728 14,896
INSTALL DISTRICT REGULATOR STATIONS ALONG STREETS OF STEPHENVILLE
AND ABANDON DISTRCT REGULATOR STATION 01 AND DISTRICT REGULATOR
STATION 09 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY OCTOBER
2518 080.66732 13,692
INSTALL DISTRICT REGULATOR STATION 12 AND DISTRICT REGULATOR STATION
16 ALONG THE STREETS OF STEPHENVILLE TEXAS AND ABANDON DISTRICT
REGULATOR STATION 12 AND DISTRICT REGULATOR STATION 16 IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY OCTOBER
2519 080.66736 4,105
INSTALL 150 FEET OF 2 INCH POLY ALONG JAMES AVENUE AND ABANDON 150
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2520 080.66748 6,696
INSTALL 725 FEET OF 2 INCH POLY ALONG ELLIS AND ABANDON 345 FEET OF 4
INCH STEEL AND 397 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER
2521 080.66752 37,327
RELOCATE FACILITIES. INSTALL 1937 FEET OF 2 INCH POLY AND 579 FEET OF 4
INCH POLY AND ABANDON 1859 FEET OF 2 INCH STEEL AND 125 FEET OF 2 INCH
POLY AND 244 FEET OF 4 INCH STEEL ALONG FM59 TO ACCOMMODATE CITY OF
ATHENS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
RELOCATION OF
FACILITIES OCTOBER
2522 080.66755 26,844
INSTALL 1400 FEET OF 2 INCH POLY ALONG GOWDY STREET AND ABANDON 1340
FEET OF 3 INCH AND 210 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR
STATION 06 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WHITEWRIGHT SYSTEM INTEGRITY OCTOBER
2523 080.66764 18
RELOCATE FACILITIES. ABANDON 80 FEET OF 2 INCH POLY ALONG LAMPASAS
STREET TO ACCOMMODATE CITY OF ROUND ROCK STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 80 of 178
299
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2524 080.66769 67,148
RELOCATE FACILITIES. INSTALL 4489 FEET OF POLY AND ABANDON 4494 FEET OF
STEEL TO ACCOMODATE THE CITY OF WACO IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
2525 080.66771 5,680
INSTALL DISTRICT REGULATOR STATION IN COLORADO CITY AND ABANDON
DISTRICT REGULATOR STATION 14 IN ACCORDANCE WITH TEXAS RAILROAD
COMMISSION RULE 8.209. ALL CUSTOMERS COLORADO CITY SYSTEM INTEGRITY OCTOBER
2526 080.66775 76,069
INSTALL 1600 FEET OF 20 INCH STEEL ALONG SCYENE ROAD AND DIXON AVENUE
AND ABANDON 1600 FEET OF 24 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2527 080.66792 5,750
INSTALL 1906 FEET OF 4 INCH POLY ALONG LEGACY DRIVE. DEVELOPER
INSTALLED FACILITIES. ALL CUSTOMERS PROSPER GROWTH MARCH
2528 080.66793 47,418
RELOCATE FACILITIES. INSTALL 3,920 FEET OF 6 INCH AND 216 FEET OF 2 INCH
POLY ALONG MCKINNEY STREET EAST AND ABANDON 1520 FEET OF 6 INCH, 2400
FEET OF 4 INCH AND 190 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF
MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
2529 080.66801 15,100
RELOCATE FACILITIES. INSTALL 620 FEET OF 4 INCH AND 220 FEET OF 2 INCH
POLY ALONG HARDY ST AND ABANDON 663 FEET OF 3 INCH, 80 FEET OF 4 INCH,
200 FEET OF 2 INCH POLY, AND 8 FEET OF 2 INCH STEEL TO ACCOMMODATE THE
CITY OF CEDAR HILL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL
RELOCATION OF
FACILITIES OCTOBER
2530 080.66804 18,082
RELOCATE FACILITIES. INSTALL 410 FEET OF 2 INCH POLY ALONG MAIN AND
ABANDON 395 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF KEMP IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEMP
RELOCATION OF
FACILITIES OCTOBER
2531 080.66805 10,306
RELOCATE FACILITIES. INSTALL 439 FEET OF 2 INCH POLY AND ABANDON 437
FEET OF 2 INCH STEEL ALONG FORBES COURT TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2532 080.66809 1,093,642
INSTALL 250 FEET OF 6 INCH STEEL ALONG AUTUMN CIRCLE IN COLLEGE STATION
AND ABANDON 250 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY DECEMBER
2533 080.66810 3,330
INSTALL 309 FEET OF 4 INCH POLY AND ABANDON 309 FEET OF 2 INCH STEEL
ALONG WALNUT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER
2534 080.66815 21,410
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY AND 385 FEET OF 4
INCH POLY AND 132 FEET OF 6 INCH POLY AND ABANDON 70 FEET OF 2 INCH
POLY AND 22 FEET OF 4 INCH STEEL AND 376 FEET OF 6 INCH STEEL ALONG
SMITH BARRY STREET TO ACCOMMODATE CITY OF PANTEGO STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS PANTEGO
RELOCATION OF
FACILITIES OCTOBER
2535 080.66817 8,913
ABANDON 640 FEET OF 3 INCH STEEL ALONG HIGHWAY 190 IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOLANVILLE SYSTEM INTEGRITY OCTOBER
2536 080.66822 31,970
RELOCATE FACILITIES. INSTALL 1450 FEET OF 4 INCH POLY ALONG METHODIST
STREET AND ABANDON 1055 FEET OF 2 INCH STEEL AND 395 FEET OF 2 INCH POLY
TO ACCOMMODATE CITY OF RED OAK STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RED OAK
RELOCATION OF
FACILITIES OCTOBER
2537 080.66831 15,237
INSTALL 3 FEET OF 3 INCH POLY AND 886 FEET OF 4 INCH POLY AND ABANDON 46
FEET OF 3 INCH POLY AND 53 FEET OF 4 INCH POLY AND 757 FEET OF 6 INCH POLY
ALONG BROOKHAVEN CLUB DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY OCTOBER
2538 080.66841 38,116
RELOCATE FACILITIES. INSTALL 3,335 FEET OF 4 INCH POLY ALONG ESPLANDE
AND ABANDON 1,910 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF
GRAND PRAIRIE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES OCTOBER
2539 080.66846 1,032
ABANDON 88 FEET OF 2 INCH STEEL ALONG EAST EXCHANGE AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2540 080.66850 54,150
RELOCATE FACILITIES. INSTALL 3378 FEET OF 2 INCH POLY AND ABANDON 640
FEET OF 2 INCH STEEL AND 200 FEET OF 3 INCH POLY AND 800 FEET OF 4 INCH
POLY ALONG CUMBERLAND ROAD TO ACCOMMODATE CITY OF WAXAHACHIE
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
RELOCATION OF
FACILITIES OCTOBER
2541 080.66859 16,388
INSTALL 117 FEET OF 4 INCH POLY AND 88 FEET OF 6 INCH POLY AND ABANDON
99 FEET OF 4 INCH STEEL, 17 FEET OF 4 INCH POLY, 64 FEET OF 6 INCH STEEL
AND, 2 FEET OF 6 INCH POLY IN THE CITY OF ABILENE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
2542 080.66862 154
ABANDON DRS54 ALONG PIERCE STREET IN SAN ANGELO IN ACCORDANCE WITH
RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
2543 080.66866 29,394
RELOCATE FACILITIES. INSTALL 280 FEET OF 2 INCH POLY ALONG EDGEWOOD
PLACE AND ABANDON 210 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF
DENTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
2544 080.66867 322 REPLACE REGULATOR AND RELIEF VALVE ON DENTON DRS06. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER
2545 080.66869 13,813
RELOCATE FACILITIES. INSTALL (4) .75 INCH POLY SERVICES AND ABANDON (4) .75
INCH POLY SERVICES ALONG FOX HOLLOW STREET TO ACCOMMODATE CITY OF
DENTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
2546 080.66870 118,136
RELOCATE FACILITIES. INSTALL 3,400 FEET OF 2 INCH POLY ALONG HILLCREST
STREET AND ABANDON 685 FEET OF 2 INCH POLY AND 2,720 FEET OF 2 INCH
STEEL TO ACCOMMODATE THE CITY OF DENTON IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
2547 080.66873 4,494
INSTALL 1080 FEET OF 4 INCH POLY ALONG FM1741 AND ABANDON 248 FEET OF 2
INCH, 550 FEET OF 4 INCH POLY, AND 13450 FEET OF 4 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER
2548 080.66878 44,460
RELOCATE FACILITIES. INSTALL 832 FEET OF 4 INCH STEEL AND ABANDON 829
FEET OF 4 INCH STEEL ALONG FM 1187 AND WILDCAT WAY TO ACCOMMODATE
CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2549 080.66887 47
INSTALL 9000 FEET OF 4 INCH, AND 6550 FEET OF 2 INCH POLY ALONG STREETS
OF SOUTHPOINTE PHASE 4 SUBDIVISION. RESIDENTIAL MANSFIELD GROWTH MARCH
2550 080.66890 1,554
ABANDON 326 FEET OF 2 INCH STEEL AND 434 FEET OF 2 INCH POLY ALONG
GROUND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS MORAN SYSTEM INTEGRITY OCTOBER
2551 080.66925 15,993
INSTALL 900 FEET OF 2 INCH POLY AND ABANDON 356 FEET OF 2 INCH STEEL AND
543 FEET OF 2 INCH STEEL ALONG MATADOR IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
2552 080.66926 300
ABANDON 34 FEET OF 2 INCH POLY AND 21 FEET OF 4 INCH STEEL ALONG JERSEY
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY OCTOBER
2553 080.66927 3,295
INSTALL RELIEF VALVE AND RETIRE RELIEF VALVE ON LINE L (SOUTH) NEAR THE
INTERSECTION OF COUNTY ROAD 107 AND COUNTY ROAD 100 IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER
2554 080.66934 452
INSTALL GAS SAMPLER AND ABANDON GAS SAMPLER ALONG THE STREETS OF
DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2555 080.66956 2,428
RELOCATE FACILITIES. INSTALL (9) POLY SERVICES ALONG THE NORTH ALLEY
FROM REGAL ROAD AND ABANDON (9) POLY SERVICES TO ACCOMMODATE THE
CITY OF PLANO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES OCTOBER
2556 080.66959 16,925
RELOCATE FACILITES. INSTALL 1150 FEET OF 2 INCH POLY AND ABANDON 314
FEET OF 3 INCH STEEL AND 399 FEET OF 2 INCH POLY AND 345 FEET OF 2 INCH
STEEL IN TRENT, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENT
RELOCATION OF
FACILITIES OCTOBER
2557 080.66972 660
INSTALL FLOW SAFE RELIEF VALVE AT REGULATOR STATION AND ABANDON 6
INCH GROVE RELIEF VALVE AT DISTRICT REGULATOR STATION IN KELLER IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 81 of 178
300
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2558 080.66976 3,120
RELOCATE FACILITIES. INSTALL 40 FEET OF 4 INCH POLY IN THE ALLEY NORTH OF
PLUMMER AND ABANDON 40 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND
RELOCATION OF
FACILITIES OCTOBER
2559 080.66980 14,591
RELOCATE FACILITES. INSTALL 300 FEET OF 6 INCH POLY AND ABANDON 300 FEET
OF 6 INCH STEEL ALONG 5TH AND CLINTON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
RELOCATION OF
FACILITIES OCTOBER
2560 080.66983 8,722
RELOCATE FACILITIES. INSTALL 187 FEET OF 2 INCH POLY ALONG HARRISON
STREET AND ABANDON 342 FEET OF 2 INCH AND 147 FEET OF 3 INCH STEEL, 28
FEET OF 2 INCH, AND 133 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF
MELISSA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA
RELOCATION OF
FACILITIES OCTOBER
2561 080.66997 31,425
RELOCATE FACILITIES. INSTALL 488 FEET OF 2 INCH POLY AND 351 FEET OF 4
INCH POLY AND ABANDON 714 FEET OF 2 INCH POLY AND 460 FEET OF 3 INCH
POLY EAST MAIN STREET TO ACCOMMODATE CITY OF ROUND ROCK STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
RELOCATION OF
FACILITIES OCTOBER
2562 080.67008 7,810
RELOCATE FACILITIES. INSTALL 200 FEET OF 6 INCH AND 185 FEET OF 2 INCH
POLY ALONG WEST CREEK STREET AND ABANDON 174 FEET OF 6 INCH IP STEEL
AND 20 FEET OF 6 INCH IP POLY AND 122 FEET OF 2 INCH STEEL TO
ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG
RELOCATION OF
FACILITIES OCTOBER
2563 080.67010 23,762
INSTALL 376 FEET OF 6 INCH POLY AND ABANDON 364 FEET OF 6 INCH CAST IRON
AND 13 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
2564 080.67027 40,365
RELOCATE FACILITIES. INSTALL 2000 FEET OF 2 INCH AND 1150 FEET OF 4 INCH
POLY ALONG ST MARY AND ABANDON 650 FEET OF 4 INCH AND 845 FEET OF 2
INCH STEEL AND 1655 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF
ROCKWALL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL
RELOCATION OF
FACILITIES OCTOBER
2565 080.67030 13,955
INSTALL 6 FEET OF 2 INCH POLY AND 512 FEET OF 4 INCH POLY AND ABANDON
296 FEET OF 2 INCH STEEL AND 204 FEET OF 2 INCH POLY ALONG MAIN STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT SYSTEM INTEGRITY OCTOBER
2566 080.67033 11,958
RELOCATE FACILITIES. INSTALL 540 FEET OF 4 INCH POLY AND ABANDON 596
FEET OF 4 INCH POLY ALONG JOHN MCLAIN ROAD AND WESTCOAT TO
ACCOMMODATE CITY OF COLLEYVILLE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
RELOCATION OF
FACILITIES OCTOBER
2567 080.67058 308
ABANDON DRS 174 AT THE INTERSECTION OF FULLER AND RYAN, FORT WORTH,
TARRANT COUNTY. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2568 080.67060 0
INSTALL 11,369 FEET OF 2 INCH POLY, 1758 FEET OF 4 INCH POLY, AND 2134 FEET
OF 6 INCH POLY ALONG THE STREETS OF THE VILLAGE OF HURRICANE CREEK
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ANNA GROWTH JANUARY
2569 080.67072 11,206
RELOCATE FACILITIES. INSTALL 1230 FEET OF 2 INCH POLY ALONG CLOVERDALE
LANE AND ABANDON 1230 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
DESOTO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO
RELOCATION OF
FACILITIES OCTOBER
2570 080.67075 385
ABANDON 1055 FEET OF 3 INCH STEEL AND 4100 FEET OF 3 INCH POLY ALONG
STREETS IN BREEZY OAKS MOBILE HOME PARK IN TARRANT COUNTY MANSFIELD
TEXAS. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY OCTOBER
2571 080.67077 151,106
INSTALL 2304 FEET OF 10 INCH STEEL AND ABANDON 2289 FEET OF 12 INCH
STEEL ALONG BLACK HILL DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GAINSVILLE SYSTEM INTEGRITY DECEMBER
2572 080.67096 5,694
RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH POLY ALONG 800 AUSTIN AVE
AND ABANDON 104 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
2573 080.67099 27,361
RELOCATE FACILITIES. INSTALL 180 FEET OF 2 INCH POLY AND 3 FEET OF 4 INCH
POLY AND 872 FEET OF 6 INCH POLY AND ABANDON 360 FEET OF 2 INCH STEEL
AND 82 FEET OF 2 INCH POLY AND 797 FEET OF 6 INCH STEEL AND 10 FEET OF 6
INCH POLY ALONG KAUFMAN STREET AND MLK JR BLVD TO ACCOMMODATE CITY
OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXACHACHIE
RELOCATION OF
FACILITIES OCTOBER
2574 080.67113 8,276
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY AND ABANDON 500
FEET OF 2 INCH POLY ALONG SHADYWOOD LANE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO
RELOCATION OF
FACILITIES OCTOBER
2575 080.67115 23,711
INSTALL 1249 FEET OF 4 INCH AND 2376 FEET OF 2 INCH POLY ALONG THE
STREETS OF LARKSPUR 9. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH OCTOBER
2576 080.67138 19,989
INSTALL (1) BLACK DIAMOND WRAP TO REMEDIATE LINE D AT APPROX 4677+00 IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER
2577 080.67139 21,649
INSTALL 2751 FEET OF 6 INCH POLY, 1311 FEET OF 4 INCH POLY AND 5132 FEET OF
2 INCH POLY ALONG THE STREETS OF WOLF RANCH. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL GEORGETOWN GROWTH NOVEMBER
2578 080.67142 27,568
RELOCATE FACILITIES. INSTALL 855 FEET OF 4 INCH POLY ALONG SOUTH 26TH
STREET TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
2579 080.67162 42,615
RELOCATE FACILITIES. INSTALL 3400 FEET OF 6 INCH, 253 FEET OF 4 INCH AND 209
FEET OF 2 INCH POLY ALONG SOUTH WESTMORELAND ROAD AND ABANDON 3400
FEET OF 6 INCH, 48 FEET OF 4 INCH AND 94 FEET OF 3 INCH AND 195 FEET OF 2
INCH POLY TO ACCOMMODATE CITY OF DESOTO ROAD IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO
RELOCATION OF
FACILITIES OCTOBER
2580 080.67166 4,408
INSTALL 740 FEET OF 2 INCH POLY ALONG RUSK STREET AND ABANDON 730 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CENTERVILLE SYSTEM INTEGRITY OCTOBER
2581 080.67167 1,155
INSTALL 350 FEET OF 2 INCH POLY ALONG S. 6TH AND ABANDON 350 FEET OF 2
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CHILLICOTHE SYSTEM INTEGRITY OCTOBER
2582 080.67183 7,496
RELOCATE FACILITIES. INSTALL 300 FEET OF 6 INCH POLY ALONG HERITAGE
TRACE PARKWAY AND ABANDON 300 FEET OF 3 INCH POLY TO ACCOMMODATE
THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2583 080.67210 4,329
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION 4746 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY OCTOBER
2584 080.67213 19,028
INSTALL 1100 FEET OF 2 INCH POLY ALONG HENDERSON AND ABANDON 1100
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
2585 080.67216 13,342
RELOCATE FACILITIES. INSTALL 68 FEET OF 2 INCH POLY AND ABANDON 43 FEET
OF 2 INCH POLY ALONG WASHINGTON AVENUE TO ACCOMMODATE CITY OF WACO
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
2586 080.67219 16,089
INSTALL 100 FEET OF 2 INCH AND 175 FEET OF 4 INCH POLY ALONG 17TH & AVE J
AND REPLACE DRS STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON SYSTEM INTEGRITY OCTOBER
2587 080.67226 271,496
INSTALL APPROX 72 VALVES AND ABANDON A TOTAL OF APPROX 658 FEET OF
STEEL OR POLY ON LOW PRESSURE SYSTEMS ACROSS SOUTH WEST WEST
REGION IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
2588 080.67227 62,795
INSTALL 11 VALVES ON LOW PRESSURE SYSTEMS ACROSS SOUTH EAST EAST
REGION IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
2589 080.67228 303,109
INSTALL 65 VALVES ON LOW PRESSURE SYSTEMS ACROSS NORTH WEST REGION
IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2590 080.67229 24,605
INSTALL 5 VALVES ON LOW PRESSURE SYSTEMS ACROSS SE SOUTH REGION IN
ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 82 of 178
301
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2591 080.67230 107,367
INSTALL 23 VALVES ON LOW PRESSURE SYSTEMS ALONG SOUTH REGION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER
2592 080.67231 76,896
INSTALL 12 VALVES ON LOW PRESSURE SYSTEMS ACROSS NORTH EAST REGION
IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY OCTOBER
2593 080.67232 15,418
INSTALL 7 VALVES ON LOW PRESSURE SYSTEMS ACROSS SOUTH WEST FORT
WORTH REGION IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE
8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER
2594 080.67237 11,134
INSTALL 242 FEET OF 6 INCH, 3256 FEET OF 4 INCH AND 3222 FEET OF 2 INCH POLY
ALONG STREETS OF WOLF RANCH WEST SECTION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL GEORGETOWN GROWTH NOVEMBER
2595 080.67241 518
ABANDON 170 FEET OF 2 INCH STEEL ALONG BOURLAND IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY OCTOBER
2596 080.67245 22,908
RELOCATE FACILITIES. INSTALL 650 FEET OF 2 INCH POLY ALONG LINDY LANE AND
ABANDON 300 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF IRVING IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
2597 080.67250 38,971
RELOCATE FACILITIES. INSTALL 300 FEET OF 6 INCH POLY ALONG CHADBOURNE
AND ABANDON 345 FEET OF 2 INCH POLY, 190 FEET OF 4 INCH POLY, 718 FEET OF
6 INCH STEEL, AND 300 FEET OF 8 INCH STEEL TO ACCOMMODATE THE CITY OF
SAN ANGELO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS SAN ANGELO
RELOCATION OF
FACILITIES OCTOBER
2598 080.67255 2,904
RELOCATE FACILITIES. INSTALL 230 FEET OF 2 INCH POLY ALONG AMESBURY
DRIVE AND ABANDON 206 FEET OF 2 INCH POLY TO ACCOMMODATE MULTI-
FAMILY CONSTRUCTION. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES MARCH
2599 080.67266 12,601
REPLACE DRS05 ALONG ASH STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MALONE SYSTEM INTEGRITY OCTOBER
2600 080.67267 8,754
RELOCATE FACILITIES. INSTALL 330 FEET OF 2 INCH POLY ALONG FAIRFAX
AVENUE AND ABANDON 300 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY
OF HIGHLAND PARK IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2601 080.67270 9,344
RELOCATE FACILITIES. INSTALL 116 FEET OF 4 INCH POLY AND ABANDON 20
FEET OF 4 INCH STEEL AND 102 FEET OF 4 INCH POLY ALONG COOPER DRIVE TO
ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
2602 080.67272 825
INSTALL 396 FEET OF 6 INCH POLY, 812 FEET OF 4 INCH POLY, AND 1,379 FEET OF
2 INCH POLY ALONG THE STREETS OF SADDLECREEK . DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
2603 080.67280 22,837
INSTALL 1175 FEET OF 2 INCH POLY AND ABANDON 634 FEET OF 2 INCH AND 4
FEET OF 4 INCH STEEL AND 102 FEET OF 2 INCH POLY ALONG KERR STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TUSCOLA SYSTEM INTEGRITY OCTOBER
2604 080.67287 14,235
RELOCATE FACILITIES. INSTALL 1530 FEET OF 2 INCH POLY AND ABANDON 175
FEET OF 4 INCH, 100 FEET OF 3 INCH STEEL, 176 FEET OF 3 INCH STEEL, 631 FEET
OF 2 INCH POLY AND 365 FEET OF 1.25 INCH POLY TO ACCOMMODATE THE TXDOT
WIDENING PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WINDOM
RELOCATION OF
FACILITIES OCTOBER
2605 080.67295 1,655
INSTALL 12,250 FEET OF 8 INCH POLY, 325 FEET OF 12 INCH STEEL ALONG FM 36.
DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS CADDO MILLS GROWTH APRIL
2606 080.67296 5,219
RELOCATE FACILITIES. INSTALL 569 FEET OF 2 INCH POLY AND ABANDON 533
FEET OF 2 INCH POLY ALONG COUNTY ROAD 852 TO ACCOMMODATE CITY OF
MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES OCTOBER
2607 080.67322 17,097
RELOCATE FACILITIES. ABANDON 240 FEET OF 6 INCH STEEL ALONG SOUTH ELM
STREET AND WEST PRAIRIE STREET TO ACCOMMODATE CITY OF DENTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
2608 080.67332 15,775
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY AND ABANDON 15
FEET OF 2 INCH POLY AND 164 FEET OF 4 INCH STEEL AND 378 FEET OF 4 INCH
POLY ALONG DANIEL DRIVE TO ACCOMMODATE CITY OF ARLINGTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
2609 080.67336 35,635
RELOCATE FACILITIES. INSTALL 425 FEET OF 2 INCH POLY AND 1221 FEET OF 4
INCH POLY AND ABANDON 133 FEET OF 2 INCH STEEL AND 432 FEET OF 3 INCH
STEEL AND 190 FEET OF 3 INCH POLY ALONG CRINER STREET TO
ACCOMMODATE CITY OF GRANDVIEW STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANDVIEW
RELOCATION OF
FACILITIES OCTOBER
2610 080.67339 (68)
INSTALL 1225 FEET OF 2 INCH POLY, 1643 FEET OF 4 INCH POLY AND 495 FEET OF
6 INCH POLY ONSITE WITHIN THE UTILITY.
COMMERCIAL OR
INDUSTRIAL FRISCO GROWTH JANUARY
2611 080.67343 2,684
RELOCATE FACILITIES. INSTALL 107 FEET OF 6 INCH POLY AND ABANDON 84
FEET OF 6 INCH POLY ALONG SPRING CREEK PARKWAY TO ACCOMMODATE CITY
OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES OCTOBER
2612 080.67346 5,975
INSTALL 388 FEET OF 2 INCH POLY ALONG ANGELINA AND ABANDON 160 FEET OF
2 INCH STEEL AND 329 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY OCTOBER
2613 080.67347 23,642
RELOCATE FACILITIES. INSTALL 1300 FEET OF 2 INCH POLY ALONG MEADOW
CREST DRIVE AND ABANDON 1300 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY
OF DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2614 080.67350 3,895
INSTALL RELIEF VALVE AND MODIFY STATION TO REMOVE BURIED SENSE LINES
ALONG 8TH STREET AND AVENUE A IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MOODY SYSTEM INTEGRITY OCTOBER
2615 080.67352 8,718
RELOCATE FACILITIES. INSTALL 670 FEET OF 2 INCH POLY ALONG SHAYNA DR AND
ABANDON 670 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2616 080.67354 28,829
RELOCATE FACILITIES. INSTALL 1800 FEET OF 2 INCH POLY ALONG CASTLEROCK
AND ABANDON 1800 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF
DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2617 080.67355 14,063
RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH POLY ALONG RED CLOUD AND
ABANDON 800 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2618 080.67359 27,945
RELOCATE FACILITIES. INSTALL 1600 FEET OF 2 INCH POLY ALONG WEBB KAY AND
ABANDON 1600 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2619 080.67362 32,833
RELOCATE FACILITIES. INSTALL 1464 FEET OF 2 INCH POLY AND ABANDON 1500
FEET OF 2 INCH STEEL ALONG DARTRIDGE ROAD TO ACCOMMODATE CITY OF
DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2620 080.67363 7,586
RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH POLY ALONG GREENSPRINT
DRIVE AND ABANDON 300 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF
DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2621 080.67364 24,378
RELOCATE FACILITIES. INSTALL 1430 FEET OF 2 INCH POLY AND ABANDON 400
FEET OF 2 INCH STEEL AND 1000 FEET OF 3 INCH STEEL ALONG SHADYDALE
DRIVE TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2622 080.67365 13,001
RELOCATE FACILITIES. INSTALL 760 FEET OF 2 INCH POLY AND ABANDON 800
FEET OF 3 INCH STEEL ALONG BUXHILL DRIVE TO ACCOMMODATE CITY OF
DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 83 of 178
302
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2623 080.67366 27,551
RELOCATE FACILITIES. INSTALL 1200 FEET OF 2 INCH POLY ALONG JOYCE WAY
AND ABANDON 1200 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF
DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2624 080.67370 82,146
RELOCATE FACILITIES. INSTALL 3010 FEET OF 2 INCH, 2185 FEET OF 4 INCH AND
160 FEET OF 6 INCH POLY ALONG 3RD, LYNN, ROBINSON AND ABANDON 5000 FEET
OF 2 INCH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS TAYLOR
RELOCATION OF
FACILITIES OCTOBER
2625 080.67372 5,919
INSTALL 830 FEET OF 2 INCH POLY ALONG DAVIS BOULEVARD. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL NORTH RICHLAND HILLS GROWTH SEPTEMBER
2626 080.67378 1,590
RELOCATE FACILITIES. INSTALL 291 FEET OF 2 INCH POLY AND ABANDON 584
FEET OF 2 INCH STEEL ALONG NORTHHAVEN PLAZA TO ACCOMMODATE CITY OF
DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2627 080.67381 597
INSTALL 500 FEET OF 4 INCH POLY ALONG ANNA AND ABANDON 200 FEET OF 2
INCH AND 300 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY OCTOBER
2628 080.67388 409
INSTALL 2,975 FEET OF 2 INCH POLY ALONG THE STREETS OF HARVEST
TOWNSIDE PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL NORTHLAKE GROWTH MARCH
2629 080.67389 14,390
INSTALL 446 FEET OF 2 INCH POLY ALONG HUTTO TRACT E IN WILLIAMSON
COUNTY. DEVELOPER INSTALLED FACILITY.
COMMERCIAL OR
INDUSTRIAL HUTTO GROWTH DECEMBER
2630 080.67390 5,904
RELOCATE FACILITIES. INSTALL 120 FEET OF 4 INCH POLY AND ABANDON 100
FEET OF 4 INCH POLY ALONG RANDOL MILL ROAD TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2631 080.67397 42,316
RELOCATE FACILITIES. INSTALL 1585 FEET OF 4 INCH POLY AN 60 FEET OF 6 INCH
POLY AND ABANDON 975 FEET OF 4 INCH, 285 FEET OF 6 INCH CAST IRON, 200
FEET OF 4 INCH STEEL AND 75 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2632 080.67401 16,750
RELOCATE FACILITIES. INSTALL 577 FEET OF 2 INCH POLY AND ABANDON 319
FEET OF 2 INCH STEEL AND 1 FEET OF 2 INCH POLY ALONG ELLIS AVENUE TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2633 080.67403 1,966
INSTALL 320 FEET OF 2 INCH POLY ALONG BURNETT AND ABANDON 320 FEET OF 2
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2634 080.67409 405
ABANDON 130 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER
2635 080.67422 34,367
RELOCATE FACILITIES. INSTALL 634 FEET OF 4 INCH POLY AND ABANDON 580
FEET OF 4 INCH STEEL ALONG LITTLE STREET TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2636 080.67436 38,550
RELOCATE FACILITIES. INSTALL 860 FEET OF 2 INCH, 600 FEET OF 4 INCH AND 440
FEET OF 6 INCH POLY ALONG MILLS STREET AND ABANDON 1900 FEET OF 2 INCH
STEEL TO ACCOMMODATE THE CITY OF TAYLOR IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR
RELOCATION OF
FACILITIES OCTOBER
2637 080.67455 112,030
RELOCATE FACILITES. INSTALL 5335 FEET OF 4 INCH AND 325 FEET OF 2 INCH
POLY ALONG BELLVIEW AND ABANDON 150 FEET OF 6 INCH POLY AND 10 FEET OF
6 INCH STEEL AND 3380 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
SULPHUR SPRINGS STREET PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS
RELOCATION OF
FACILITIES OCTOBER
2638 080.67468 317
ABANDON DISTRICT REGULATOR STATION 159 IN FORT WORTH IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2639 080.67469 19,808
INSTALL 600 FEET OF 2 INCH AND 75 FEET OF 4 INCH POLY ABANDON DRS#01 IN
WHITESBORO AND 62 FEET OF 4 INCH STEEL AND 22 FEET OF 4 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITESBORO SYSTEM INTEGRITY OCTOBER
2640 080.67478 5,354
RELOCATE FACILITIES. INSTALL 130 FEET OF 4 INCH POLY AND ABANDON 140
FEET OF 4 INCH POLY ALONG PARKER ROAD TO ACCOMMODATE CITY OF PLANO
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES OCTOBER
2641 080.67495 609
ABANDON DISTRICT REGULATOR STATION 142 IN DALLAS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2642 080.67497 23,835
INSTALL 1027 FEET OF 2 INCH POLY AND ABANDON 6 FEET OF 2 INCH POLY AND
766 FEET OF 4 INCH STEEL ALONG SAINT THOMAS DRIVE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY OCTOBER
2643 080.67498 45,238
INSTALL 150 FEET OF 2 INCH AND 1995 FEET OF 4 INCH POLY SOUTH LINGLEVILLE
ROAD AND ABANDON 213 FEET OF 3 INCH AND 1697 FEET OF 2 INCH STEEL AND
442 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY OCTOBER
2644 080.67544 678
ABANDON DISTRICT REGULATOR STATION #112 IN UNIVERSITY PARK IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2645 080.67551 9,284
INSTALL 288 FEET OF 2 INCH POLY AND ABANDON 196 FEET OF 2 INCH STEEL
AND 246 FEET OF 3 INCH STEEL ALONG 15TH STREET AND HICKORY STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLORADO CITY SYSTEM INTEGRITY OCTOBER
2646 080.67556 21,721
RELOCATE FACILITIES. INSTALL (10) .75 INCH POLY SERVICES AND ABANDON (10)
.75 INCH POLY SERVICES ALONG CAT MOUNTAIN TO ACCOMMODATE THE CITY OF
KELLER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS KELLER
RELOCATION OF
FACILITIES OCTOBER
2647 080.67560 3,144
INSTALL 113 FEET OF 2 INCH POLY AND ABANDON 309 FEET OF 3 INCH CAST IRON
ALONG GRACE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2648 080.67562 19,281
INSTALL 190 FEET OF 2 INCH AND 60 FEET OF 6 INCH POLY ALONG FM 1138 AND
ABANDON 190 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NEVADA SYSTEM INTEGRITY OCTOBER
2649 080.67566 60,483
RELOCATE FACILITIES. INSTALL 1300 FEET OF 2 INCH POLY ALONG BRYN MAWR
DR AND ABANDON 1300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2650 080.67573 43,732
INSTALL 500 FEET OF 6 INCH POLY, 2000 FEET OF 4 INCH POLY AND 7100 FEET OF
2 INCH POLY ALONG THE STREETS OF WATERSCAPE SUBDIVISION. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH DECEMBER
2651 080.67580 10,774
INSTALL 3 FEET OF 2 INCH POLY AND 950 FEET OF 4 INCH POLY AND ABANDON
1256 FEET OF 2 INCH STEEL AND 4 FEET OF 2 INCH POLY ALONG KEGLEY LANE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER
2652 080.67583 2,611
RELOCATE FACILITIES. INSTALL 25 FEET OF 4 INCH POLY AND ABANDON 20 FEET
OF 3 INCH POLY ALONG TREZEVANT STREET TO ACCOMMODATE CITY OF DALLAS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2653 080.67589 1,180
INSTALL 2 INCH VALVE ON DRS 02 IN OLNEY AND ABANDON 2 INCH VALVE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY SYSTEM INTEGRITY OCTOBER
2654 080.67590 65,874
RELOCATE FACILITIES. INSTALL 3200 FEET OF 6 INCH POLY AND 200 FEET OF 4
INCH POLY ALONG PARKER ROAD AND CUSTER PKWY AND ABANDON 2900 FEET
OF 6 INCH IP POLY MAIN, 500 FEET OF 4 INCH IP POLY MAIN AND 100 FEET OF 3
INCH POLY TO ACCOMMODATE CITY OF PLANO STREET PROJECT IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES OCTOBER
2655 080.67592 5,258
RELOCATE FACILITIES. INSTALL 200 FEET OF 6 INCH POLY AND ABANDON 175
FEET OF 6 INCH POLY ALONG HARMON ROAD TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 84 of 178
303
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2656 080.67597 6,194
RELOCATE FACILITIES. INSTALL 290 FEET OF 4 INCH POLY AND 3 FEET OF 6 INCH
POLY AND 4 FEET OF 8 INCH POLY AND ABANDON 50 FEET OF 8 INCH STEEL AND
60 FEET OF 8 INCH POLY ALONG PETER SMITH STREET AND HEMPHILL STREET TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2657 080.67598 42
ABANDON 6 FEET OF 6 INCH POLY AND 2 FEET OF 8 INCH POLY ALONG HOWELL
AND ROUTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2658 080.67604 39,091
RELOCATE FACILITIES. INSTALL 1500 FEET OF 8 INCH AND 250 FEET OF 2 INCH
POLY AND ABANDON 422 FEET OF 6 INCH AND 397 FEET OF 4 INCH AND 494 FEET
OF 6 INCH AND 451 FEET OF 4 INCH STEEL ALONG CLIFT STREET TO
ACCOMMODATE THE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
RELOCATION OF
FACILITIES OCTOBER
2659 080.67610 85,061
RELOCATE FACILITIES. INSTALL 3500 FEET OF 4 INCH AND 750 FEET OF 2 INCH
POLY ALONG RAMEY AVENUE AND ABANDON 4040 FEET OF 4 INCH, 60 FEET OF 3
INCH AND 280 FEET OF 2 INCH STEEL AND 1270 FEET OF 2 INCH POLY TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2660 080.67623 2,203
RELOCATE FACILITIES. INSTALL (5) .75 INCH POLY SERVICES ALONG CLIFFSIDE
DRIVE AND ABANDON (5) .75 INCH POLY SERVICES TO ACCOMMODATE
RIHCARDSON ALLEY PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
RELOCATION OF
FACILITIES OCTOBER
2661 080.67626 2,779
RELOCATE FACILITIES. INSTALL 23 FEET OF 4 INCH POLY AND ABANDON 16 FEET
OF 2 INCH POLY ALONG CROSSLAKE PARKWAY TO ACCOMMODATE CITY OF WACO
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
2662 080.67629 1,024
REPLACE OBSOLETE RELIEF VALVE ON DRS38 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER
2663 080.67631 32,737
RELOCATE FACILITIES. INSTALL 1000 FEET OF 4 INCH AND 950 FEET OF 2 INCH
POLY ALONG SOUTH FOURTH AT MARY AVENUE AND ABANDON 445 FEET OF 6
INCH, 124 FEET OF 4 INCH, 16 FEET OF 3 INCH AND 47 FEET OF 2 INCH STEEL AND
394 FEET OF POLY TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
2664 080.67644 5,979
RELOCATE FACILITIES. INSTALL 1340 FEET OF 2 INCH POLY ALONG WASHINGTON
ST AND ABANDON 1320 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
RELOCATION OF
FACILITIES OCTOBER
2665 080.67672 9,658
ABANDON 26 MOTORIZED REGULATORS AND INSTALL 26 MOTORIZED
REGULATORS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2666 080.67682 17,423
RELOCATE FACILITIES. ABANDON 107 FEET OF 2 INCH STEEL AND 870 FEET OF 2
INCH POLY RAMEY AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2667 080.67683 311
ABANDON DRS 154 IN THE VICINITY OF WEST WAGGOMAN AND LIVINGSTON
AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2668 080.67688 6,736
RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH POLY AND ABANDON 107
FEET OF 2 INCH POLY ALONG WENZ AVENUE AND MACARTHUR DRIVE TO
ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
2669 080.67720 43,511
RELOCATE FACILITIES. INSTALL 560 FEET OF 12 INCH POLY AND 180 FEET OF 2
INCH POLY ALONG 9TH AVENUE AND ABANDON 540 FEET OF 12 INCH STEEL AND
190 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH IN
ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2670 080.67727 7,544
RELOCATE FACILITIES. INSTALL 394 FEET OF 4 INCH POLY AND 3 FEET OF 8 INCH
POLY AND ABANDON 60 FEET OF 4 INCH POLY AND 337 FEET OF 8 INCH POLY
ALONG STONEBRIDGE DRIVE TO ACCOMMODATE CITY OF MCKINNEY STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES OCTOBER
2671 080.67731 5,676
RELOCATE FACILITIES. INSTALL 80 FEET OF 4 INCH POLY ALONG WOOD STREET
AND ABANDON 80 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF
MCKINNEY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES OCTOBER
2672 080.67748 11,935
RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH POLY ALONG APRIL HILL
ALLEY AND ABANDON 800 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF
DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2673 080.67753 10,150
INSTALL 416 FEET OF 2 INCH POLY AND ABANDON 1021 FEET OF 2 INCH STEEL
AND 15 FEET OF 2 INCH POLY ALONG MCKINNEY STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER
2674 080.67754 13,113
INSTALL 375 FEET OF 2 INCH POLY AND ABANDON 447 FEET OF 3 INCH, 241 FEET
OF 2 INCH STEEL, AND DISTRICT REGLUATOR STATION 10 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PETROLIA SYSTEM INTEGRITY OCTOBER
2675 080.67757 64
ABANDON DISTRICT REGULATOR STATION #023 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2676 080.67766 2,983
INSTALL 835 FEET OF 2 INCH POLY ALONG FANNIN ROAD. DEVELOPER INSTALLED
FACILITIES.
COMMERCIAL OR
INDUSTRIAL MELISSA GROWTH MARCH
2677 080.67772 39
ABANDON DISTRICT REGULATOR STATION #222 IN DALLAS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2678 080.67774 597
ABANDON DISTRICT REGULATOR STATION 029 IN DALLAS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2679 080.67782 78,084
RELOCATE FACILITIES. INSTALL 3600 FEET OF 4 INCH AND 100 FEET OF 6 INCH
POLY ALONG RAMEY AVENUE AND ABANDON 3550 FEET OF 4 INCH, 50 FEET OF 3
INCH AND 100 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF FORT
WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2680 080.67783 10,972
INSTALL 288 FEET OF 2 INCH POLY AND ABANDON 280 FEET OF 2 INCH STEEL
AND 4 FEET OF 2 INCH POLY ALONG BALLINGER STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
2681 080.67791 27,835
INSTALL 900 FEET OF 4 INCH AND 2,451 FEET OF 2 INCH POLY ALONG THE
STREETS OF LARKSPUR. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH OCTOBER
2682 080.67792 193,901
INSTALL 11 FEET OF 2 INCH POLY AND 5 FEET OF 4 INCH POLY AND 22 FEET OF 6
INCH POLY AND 2129 FEET OF 12 INCH POLY AND ABANDON 2115 FEET OF 12 INCH
STEEL ALONG BECKLEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2683 080.67806 7,868
RELOCATE FACILITIES. INSTALL 135 FEET OF 4 INCH AND 150 FEET OF 2 INCH
POLY ALONG FOREST VISTA DRIVE AND ABANDON 135 FEET OF 3 INCH AND 150
FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF FLOWER MOUND IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
RELOCATION OF
FACILITIES OCTOBER
2684 080.67824 183
INSTALL 875 FEET OF 2 INCH POLY ALONG HIGHWAY 377. DEVELOPER INSTALLED
FACILITIES.
COMMERCIAL OR
INDUSTRIAL STEPHENVILLE GROWTH JUNE
2685 080.67825 62,348
INSTALL 3 FEET OF 3 INCH POLY AND 35 FEET OF 4 INCH POLY AND 1527 FEET OF
12 INCH POLY AND ABANDON 15 FEET OF 3 INCH STEEL AND 23 FEET OF 4 INCH
STEEL AND 4 FEET OF 4 INCH POLY AND 1497 FEET OF 10 INCH STEEL ALONG
ELMWOOD AND BROOKHOLLOW IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
2686 080.67826 62,548
INSTALL 18 FEET OF 6 INCH POLY AND 2817 FEET OF 12 INCH POLY AND ABANDON
36 FEET OF 6 INCH STEEL AND 3008 FEET OF 10 INCH STEEL AND 102 FEET OF 12
INCH POLY ALONG MAPLE STREET IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 85 of 178
304
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2687 080.67827 193,736
RELOCATE FACILITIES. INSTALL 4400 FEET OF 2 INCH POLY AND ABANDON 1370
FEET OF 1.25 INCH, 850 FEET OF 2 INCH, 670 FEET OF 2 INCH STEEL, 432 FEET OF 4
INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2688 080.67829 9,984
INSTALL 400 FEET OF 2 INCH AND 50 FEET OF 4 INCH POLY AND ABANDON 241
FEET OF 2 INCH AND 159 FEET OF 4 INCH STEEL AND 18 FEET OF 2 INCH POLY AND
REPLACE DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OKLAUNION SYSTEM INTEGRITY OCTOBER
2689 080.67833 21,838
RELOCATE FACILITIES. INSTALL 480 FEET OF 4 INCH POLY AND ABANDON 475
FEET OF 2 INCH STEEL ALONG DAVIS STREET TO ACCOMMODATE CITY OF WEST
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WEST
RELOCATION OF
FACILITIES OCTOBER
2690 080.67843 28,153
INSTALL 2460 FEET OF 2 INCH POLY AND 3060 FEET OF 4 INCH POLY ALONG THE
STREETS OF HUNTERS RUN IN THE LIBERTY SUBDIVISION. RESIDENTIAL MELISSA GROWTH MARCH
2691 080.67846 374
ABANDON DISTRICT REGULATOR STATION 153 ALONG BOWIE STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2692 080.67854 3,776
REPLACE DISTRICT REGULATOR STATION 24 ALONG SOUTH 18TH STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER
2693 080.67855 18,445
RELOCATE FACILITIES. INSTALL 2699 FEET OF 4 INCH POLY AND ABANDON 2655
FEET OF 4 INCH POLY TO ACCOMODATE TXDOT IMPROVEMENT PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LLANO
RELOCATION OF
FACILITIES OCTOBER
2694 080.67860 6,738
INSTALL 57 FEET OF 2 INCH POLY AND 84 FEET OF 4 INCH POLY AND ABANDON 7
FEET OF 2 INCH STEEL AND 12 FEET OF 4 INCH STEEL ALONG CHINA STREET AND
HANNA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CALVERT SYSTEM INTEGRITY OCTOBER
2695 080.67873 2,941
INSTALL DISTRICT REGULATOR STATION IN DENTON AND ABANDON DISTRICT
REGULATOR STATION DRS49 IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER
2696 080.67887 15,894
INSTALL 840 FEET OF 4 INCH POLY AND ABANDON 772 FEET OF 3 INCH STEEL
ALONG COLLINS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
2697 080.67888 15,068
RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY AND ABANDON 225
FEET OF 4 INCH STEEL ALONG LD LOCKET ROAD TO ACCOMMODATE THE CITY OF
COLLEYVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS COLLEYVILLE
RELOCATION OF
FACILITIES OCTOBER
2698 080.67893 30,131
INSTALL 26 FEET OF 3 INCH POLY AND 1295 FEET OF 8 INCH POLY AND ABANDON
14 FEET OF 3 INCH STEEL AND 1285 FEET OF 8 INCH STEEL ALONG THE STEETS OF
KENSINGTON VALLEY SUBDIVISION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEAGOVILLE SYSTEM INTEGRITY OCTOBER
2699 080.67895 12,583
INSTALL 800 FEET OF 2 INCH POLY AND ABANDON 615 FEET OF 4 INCH STEEL
AND 105 FEET OF 4 INCH POLY ALONG ARMSTRONG IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLOOMING GROVE SYSTEM INTEGRITY OCTOBER
2700 080.67908 21,293
RELOCATE FACILITIES. INSTALL 487 FEET OF 2 INCH POLY AND ABANDON 487
FEET OF 2 INCH STEEL ALONG NANTUCKET TO ACCOMMODATE CITY OF
RICHARDSON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
RELOCATION OF
FACILITIES OCTOBER
2701 080.67909 8,661
INSTALL 330 FEET OF 2 INCH POLY AND ABANDON 310 FEET OF 4 INCH STEEL AND
GAINESVILLE DRS08 (S203) IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE SYSTEM INTEGRITY OCTOBER
2702 080.67911 19,135
INSTALL 1270 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR
STATION # 10 IN GAINESVILLE AND 2283 FEET OF 2 INCH STEEL AND POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE SYSTEM INTEGRITY OCTOBER
2703 080.67912 23,207
INSTALL 170 FEET OF 2 INCH AND 325 FEET OF 4 INCH POLY AND DISTRICT
REGULATOR STATION 19 AND ABANDON DISTRICT REGULATOR STATION 19 AND 43
FEET OF 4 INCH AND 198 FEET OF 2 INCH BARE STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE SYSTEM INTEGRITY OCTOBER
2704 080.67913 6,327
INSTALL DISTRICT REGULATOR STATION ALONG STREETS OF NOCONA AND
ABANDON DISTRICT REGULATOR STATION 15 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA SYSTEM INTEGRITY OCTOBER
2705 080.67920 3,040
INSTALL 4560 FEET OF 2 INCH POLY ALONG THE STREETS OF ANNA CROSSING.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ANNA GROWTH MARCH
2706 080.67930 64,472
INSTALL 647 FEET OF 2 INCH POLY AND 59 FEET OF 6 INCH POLY AND 29 FEET OF
8 INCH POLY AND 1185 FEET OF 12 INCH POLY AND ABANDON 585 FEET OF 2 INCH
STEEL AND 617 FEET OF 6 INCH STEEL AND 839 FEET OF 10 INCH STEEL ALONG T
LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
2707 080.67933 35,416
RELOCATE FACILITIES. INSTALL 35 POLY SERVICES ALONG MIRIAM LANE AND
ABANDON 35 POLY SERVICES ALONG MIRIAM LANE TO ACCOMMODATE THE CITY
OF ARLINGTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
2708 080.67934 7,644
RELOCATE FACILITIES. INSTALL 506 FEET OF 2 INCH POLY AND ABANDON 490
FEET OF 2 INCH POLY ALONG LONGWORTH BOULEVARD TO ACCOMMODATE CITY
OF DUNCANVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE
RELOCATION OF
FACILITIES OCTOBER
2709 080.67939 156
ABANDON DISTRICT REGULATOR STATION IN COLEMAN IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY OCTOBER
2710 080.67946 551
ABANDON DISTRICT REGULATOR STATION ALONG NW 32ND STREET AND ELLIS
AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2711 080.67952 4,890
REPLACE DENISON DISTRICT REGULATOR STATION 40 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER
2712 080.67953 9,174
INSTALL DISTRICT REGULATOR STATION 02 ALONG KING STREET AND 4TH STREET
IN BELLEVUE, TX AND ABANDON DISTRICT REGULATOR STATION 02 IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELLEVUE SYSTEM INTEGRITY OCTOBER
2713 080.67955 12,265
INSTALL DISTRICT REGULATOR STATION 05 ALONG W SOUTH STREET IN ARCHER
CITY AND ABANDON DISTRICT REGULATOR STATION 05 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARCHER CITY SYSTEM INTEGRITY OCTOBER
2714 080.67956 11,327
INSTALL DISTRICT REGULATOR STATION 08 ALONG VINE AND MAIN STREET IN
ARCHER CITY AND ABANDON DISTRICT REGULATOR STATION 08 IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARCHER CITY SYSTEM INTEGRITY OCTOBER
2715 080.67957 11,026
REPLACE ARCHER CITY DRS09 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ARCHER CITY SYSTEM INTEGRITY OCTOBER
2716 080.67959 7,796
INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 119 FEET OF 2 INCH STEEL AND
30 FEET OF 2 INCH POLY AND REPLACE ARCHER CITY DRS13 IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARCHER CITY SYSTEM INTEGRITY OCTOBER
2717 080.67961 9,130
REPLACE BYERS DRS02 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209 ALL CUSTOMERS BYERS SYSTEM INTEGRITY OCTOBER
2718 080.67962 7,419
REPLACE DISTRICT REGULATOR STATION 4 IN BYERS IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BYERS SYSTEM INTEGRITY OCTOBER
2719 080.67964 4,499
INSTALL CLOCK SPRING ALONG LINE F IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY OCTOBER
2720 080.67966 14,737
INSTALL DISTRICT REGULATOR STATION 03 ALONG GARRISON AVENUE AND
DALLAS STREET IN ELECTRA, TX AND ABANDON DISTRICT REGULATOR STATION 03
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY OCTOBER
2721 080.67967 6,640
REPLACE ELECTRA DRS09 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY OCTOBER
2722 080.67968 8,728
INSTALL DISTRICT REGULATOR STATION 011 ALONG GARRISON AVENUE AND
NORTH ILLINOIS STREET IN ELECTRA, TX AND ABANDON DISTRICT REGULATOR
STATION 011 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY OCTOBER
2723 080.67969 6,526
INSTALL 140 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY AND ABANDON 11 FEET
OF 6 INCH, 75 FEET OF 4 INCH AND 30 FEET OF 2 INCH STEEL AND 15 FEET OF 6
INCH POLY AND REPLACE HENRIETTA DRS04 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 86 of 178
305
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2724 080.67970 8,766
REPLACE HENRIETTA DISTRICT REGULATOR STATION 09 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY OCTOBER
2725 080.67971 23,186
INSTALL 1,085 OF POLY MAIN ALONG PAYNE AND ABANDON 988 FEET OF STEEL
AND ABANDON DISTRICT REGULATOR STATION 12 IN OLNEY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY SYSTEM INTEGRITY OCTOBER
2726 080.67972 17,012
INSTALL 1,030 FEET OF 2 INCH POLY AND ABANDON 1,197 FEET OF 2 INCH STEEL,
136 FEET OF 2 INCH POLY, 20 FEET OF 2 INCH STEEL, 5 FEET OF 4 INCH, AND 27
FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION #14 IN OLNEY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY SYSTEM INTEGRITY OCTOBER
2727 080.67973 24,452
INSTALL 1000 FEET OF 2 INCH POLY AND ABANDON 7 FEET OF 4 INCH STEEL, 984
FEET OF 3 INCH STEEL AND 20 FEET OF 2 INCH STEEL AND 274 FEET OF 3 INCH
POLY AND 244 FEET OF 2 INCH POLY ALONG GALLOWAY DRIVE IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY SYSTEM INTEGRITY OCTOBER
2728 080.67974 15,970
INSTALL 750 FEET OF 2 INCH POLY AND ABANDON 785 FEET OF POLY AND
ABANDON DISTRICT REGULATOR STATION 45 ALONG W MAIN AND S AVENUE K IN
OLNEY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY SYSTEM INTEGRITY OCTOBER
2729 080.67988 1,527
INSTALL 45 FEET OF 2 INCH POLY ALONG LOOP 13 AND ABANDON 42 FEET OF 2
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER
2730 080.68023 8,800
INSTALL 3 FEET OF 3 INCH POLY AND 525 FEET OF 4 INCH POLY AND ABANDON
528 FEET OF 3 INCH STEEL ALONG DOUGLAS IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARLSBAD SYSTEM INTEGRITY OCTOBER
2731 080.68029 27,477
INSTALL 80 FEET OF 4 INCH STEEL ALONG LINE U10 AND ABANDON 80 FEET OF 4
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KNOX CITY SYSTEM INTEGRITY OCTOBER
2732 080.68047 12,524
RELOCATE FACILITIES. INSTALL 915 FEET OF 2 INCH POLY AND ABANDON 513
FEET OF 2 INCH STEEL ALONG DANIEL DRIVE TO ACCOMMODATE CITY OF
ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
2733 080.68063 7,552
RELOCATE FACILITIES. INSTALL 376 FEET OF 4 INCH POLY AND ABANDON 30 FEET
OF 2 INCH POLY AND 350 FEET OF 4 INCH POLY ALONG BOAZ ROAD TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2734 080.68078 17,710
INSTALL 1450 FEET OF 2 INCH POLY AND ABANDON 434 FEET OF 4 INCH STEEL
AND 441 FEET OF 2 INCH STEEL AND 372 FEET OF 4 INCH POLY AND 238 FEET OF 2
INCH POLY ALONG WALNUT STREET IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2735 080.68081 34,956
INSTALL 1500 FEET OF 4 INCH POLY AND ABANDON 1650 FEET OF 4 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
2736 080.68093 1,980
INSTALL 7,305 FEET OF 8 INCH POLY ALONG ROADWAY OF TRADITION.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH APRIL
2737 080.68108 11,330
RELOCATE FACILITIES. INSTALL 682 FEET OF 2 INCH POLY AND ABANDON 682
FEET OF 2 INCH POLY ALONG BEALL STREET TO ACCOMMODATE CITY OF DALLAS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2738 080.68110 12,919
INSTALL 160 FEET OF 2 INCH POLY ALONG 6TH STREET DUE TO CUSTOMER
GROWTH. ALL CUSTOMERS PRINCETON GROWTH NOVEMBER
2739 080.68118 322
RELOCATE FACILITIES. ABANDON 836 FEET OF 2 INCH STEEL TO ACCOMMODATE
CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
RELOCATION OF
FACILITIES OCTOBER
2740 080.68124 4,627
INSTALL 4750 FEET OF 2 INCH AND 930 FEET OF 6 INCH POLY ALONG THE STREETS
OF ANNA RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ANNA GROWTH APRIL
2741 080.68128 52,102
RELOCATE FACILITIES. INSTALL 568 FEET OF 4 INCH POLY AND ABANDON 367
FEET OF 3 INCH POLY AND 128 FEET OF 4 INCH POLY ALONG US 281 TO
ACCOMMODATE CITY OF MARBLE FALLS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARBLE FALLS
RELOCATION OF
FACILITIES OCTOBER
2742 080.68157 41,362
RELOCATE FACILITIES. INSTALL 2300 FEET OF 6 INCH ALONG NORTH RIVERSIDE
DRIVE AND ABANDON 2175 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2743 080.68162 30
INSTALL 5830 FEET OF 4 INCH POLY AND 5850 FEET OF 2 INCH POLY ALONG THE
STREETS OF LAKEPOINTE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LAVON GROWTH JANUARY
2744 080.68185 801 INSTALL 100 FEET OF 2 INCH POLY ALONG NORMAN DRIVE IN EULESS TX. RESIDENTIAL EULESS GROWTH MARCH
2745 080.68209 42,257
INSTALL 2500 FEET OF 4 INCH POLY AND 900 FEET OF 2 INCH POLY ALONG W
HENDERSON STREET AND ABANDON 1200 FEET OF 4 INCH POLY AND 450 FEET OF
4 INCH STEEL AND 360 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER
2746 080.68212 46,104
RELOCATE FACILITIES. REPLACE 84 SERVICE LINES ALONG ALBERMARLE DRIVE
AND BURGESS DRIVE AND DARLA DRIVE AND EVEREST DRIVE TO ACCOMMODATE
THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2747 080.68225 6,277
REPLACE GROUND BED ON LINE D17-4 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WYLIE SYSTEM INTEGRITY OCTOBER
2748 080.68240 92,652
INSTALL 2050 FEET OF 2 INCH POLY AND ABANDON 890 FEET OF 3 INCH CAST
IRON, 265 FEET OF 4 INCH CAST IRON, 420 FEET OF 6 INCH CAST IRON, AND 450
FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2749 080.68245 26,490
INSTALL 1650 FEET OF 2 INCH POLY AND ABANDON 5 FEET OF 2 INCH CAST IRON,
800 FEET OF 4 INCH CAST IRON, 455 FEET OF 2 INCH STEEL, 130 FEET OF 2 INCH
CAST IRON AND 100 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2750 080.68248 80,161
INSTALL 1520 FEET OF 4 INCH POLY AND ABANDON 1520 FEET OF 8 INCH CAST
IRON ALONG CARPENTER AVENUE IN ACCORDANCE WITH RAIL ROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2751 080.68252 43,194
INSTALL 1465 FEET OF 4 INCH POLY AND ABANDON 90 FEET OF 2 INCH CAST IRON,
85 FEET OF 4 INCH CAST IRON AND 1380 FEET OF 8 INCH CAST IRON ALONG
STONEWALL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2752 080.68253 44,851
INSTALL 2450 FEET OF 4 INCH POLY AND ABANDON 1420 FEET OF 4 INCH STEEL
AND 985 FEET OF 4 INCH POLY AND 510 FEET OF 6 INCH CAST IRON ALONG
AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2753 080.68255 37,887
INSTALL 1600 FEET OF POLY AND ABANDON 278 FEET OF 4 INCH STEEL AND 20
FEET OF 4 INCH POLY AND 699 FEET OF 6 INCH CAST IRON AND 724 FEET OF 6
INCH POLY ALONG BYERS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2754 080.68256 63,211
INSTALL 825 FEET OF 4 INCH POLY, 3000 FEET OF 2 POLY AND ABANDON 1200
FEET OF 4 INCH CAST IRON, 1560 FEET OF 4 INCH STEEL, 1475 FEET OF 6 INCH
STEEL ALONG W. HAMMOND STREET IN FORT WORTH TX IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2755 080.68258 6,977
REPLACE GROUND BED ALONG LINE O28-6 AND RECTIFIER GROUND BED ALONG
LINE O28 IN WYLIE, TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WYLIE SYSTEM INTEGRITY OCTOBER
2756 080.68259 33,974
INSTALL 2000 FEET OF 4 POLY AND ABANDON 2000 FEET OF 6 INCH CAST IRON
ALONG W. HAMMOND STREET IN FORT WORTH TX IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2757 080.68261 39,585
INSTALL 2500 FEET OF 4 INCH POLY AND ABANDON 633 FEET OF 4 INCH STEEL
AND 1605 FEET OF 6 INCH CAST IRON ALONG STREETS OF FORT WORTH IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 87 of 178
306
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2758 080.68262 40,276
INSTALL 1440 FEET OF 2 INCH POLY AND ABANDON 570 FEET OF 2 INCH CAST
IRON, 45 FEET OF 2 INCH POLY, 125 FEET OF 2 INCH STEEL ALONG HOBSON
AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2759 080.68264 81,995
INSTALL 235 FEET OF 2 INCH POLY AND 1460 FEET OF 4 INCH POLY AND ABANDON
1595 FEET OF 4 INCH CAST IRON ALONG BUENA VISTA STREET AND LEE STREET IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2760 080.68266 3,103
RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 150
FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2761 080.68269 22,943
INSTALL 1310 FEET OF 2 INCH POLY AND ABANDON 1210 FEET OF 4 INCH CAST
IRON AND 100 FEET OF 4 INCH STEEL ALONG OWENWOOD AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2762 080.68271 59,669
INSTALL 2090 FEET OF 2 INCH POLY AND ABANDON 2005 FEET OF 4 INCH, 20 FEET
OF 6 INCH CAST IRON AND 65 FEET OF 4 INCH POLY ALONG ALASKA AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2763 080.68272 7,262
REPLACE DISTRICT REGULATOR STATION #25 IN MARLIN AND ABANDON EXISTING
DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY OCTOBER
2764 080.68273 7,746
REPLACE DISTRICT REGULATOR STATION #14 IN MARLIN AND ABANDON EXISTING
DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY OCTOBER
2765 080.68278 14,110
INSTALL 6 FEET OF 3 INCH POLY AND 279 FEET OF 4 INCH POLY AND 1 FEET OF 6
INCH POLY AND ABANDON 134 FEET OF 4 INCH STEEL AND 21 FEET OF 4 INCH
POLY AND 140 FEET OF 6 INCH STEEL AND 2 FEET OF 6 INCH POLY ALONG
MESQUITE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY OCTOBER
2766 080.68279 10,857
INSTALL DISTRICT REGULATOR STATION 03 ALONG MESQUITE STREET AND
BORDEN STREET IN ABBOTT, TX AND ABANDON DISTRICT REGULATOR STATION 03
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABBOTT SYSTEM INTEGRITY OCTOBER
2767 080.68287 10,134
RELOCATE FACILITES. INSTALL 458 FEET OF 2 INCH POLY ALONG MIMOSA STREET
AND ABANDON 349 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF
KEERVILLE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
RELOCATION OF
FACILITIES OCTOBER
2768 080.68294 8,129
REPLACE DISTRICT STATION #03 IN BREMOND AND ABANDON EXISTING DRS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BREMOND SYSTEM INTEGRITY OCTOBER
2769 080.68309 20,759
INSTALL 1760 FEET OF 2 INCH POLY MAIN ALONG LAHOMA STREET AND ABANDON
915 FEET OF 4 INCH CAST IRON, 775 FEET OF 6 INCH CAST IRON, AND 70 FEET OF 4
INCH STEEL MAIN IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE
8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2770 080.68310 132,833
INSTALL 3130 FEET OF 2 INCH POLY AND ABANDON 2255 FEET OF 4 INCH CAST
IRON AND 750 FEET OF 4 INCH POLY ALONG OPAL AVENUE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2771 080.68312 58,004
INSTALL 450 FEET OF 2 INCH POLY AND 1365 FEET OF 4 INCH POLY AND ABANDON
675 FEET OF 2 INCH CAST IRON AND 1075 FEET OF 4 INCH CAST IRON ALONG
FORDHAM ROAD IN ACORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2772 080.68313 27,789
INSTALL 1390 FEET OF 2 INCH POLY ALONG MARYLAND AVENUE AND ABANDON
665 FEET OF 4 INCH CAST IRON, 520 FEET OF 2 INCH POLY, 170 FEET OF 6 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2773 080.68314 50,937
INSTALL 2200 FEET OF 4 INCH POLY AND ABANDON 660 FEET OF 4 INCH CAST
IRON, 350 FEET OF 6 INCH CAST IRON, 1225 FEET OF 4 INCH STEEL ALONG W.
BOYCE AVENUE IN FORT WORTH TX IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2774 080.68315 33,189
INSTALL 1350 FEET OF 4 INCH POLY AND ABANDON 1250 FEET OF 4 INCH CAST
IRON AND 375 FEET OF 6 INCH POLY ALONG RYAN AVENUE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2775 080.68316 33,279
INSTALL 1844 FEET OF 4 INCH POLY AND ABANDON 1950 FEET OF 4 INCH CAST
IRON AND 232 FEET OF POLY ALONG WAGGOMAN STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2776 080.68318 43,087
INSTALL 2000 FEET OF 4 INCH STEEL AND ABANDON 2005 FEET OF 4 INCH CAST
IRON AND 500 FEET OF 6 INCH CAST IRON ALONG W. BOYCE AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2777 080.68335 3,558
REPLACE DISTRICT REGULATOR STATION #18 IN MARLIN AND ABANDON EXISTING
DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY OCTOBER
2778 080.68337 1,152
ABANDON DISTRICT REGULATOR STATION #22 IN TAYLOR IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR SYSTEM INTEGRITY OCTOBER
2779 080.68344 62,385
INSTALL COMPOSITE WRAP ON LINE D IN DALLAS COUNTY TO REMEDIATE
ANOMALIES. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2780 080.68346 5,508
INSTALL 61 FEET OF 2 INCH POLY AND 180 FEET OF 4 INCH POLY AND ABANDON 10
FEET OF 2 INCH POLY AND 98 FEET OF 3 INCH STEEL AND 282 FEET OF 4 INCH
STEEL ALONG MARKET STREET IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS BAIRD SYSTEM INTEGRITY OCTOBER
2781 080.68349 3,058
RELOCATE FACILITIES. INSTALL 30 FEET OF 6 INCH POLY ALONG SMITHFIELD
ROAD AND ABANDON 20 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF
NORTH RICHLAND HILLS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS NORTH RICHLAND HILLS
RELOCATION OF
FACILITIES OCTOBER
2782 080.68353 28
INSTALL 2170 FEET 4 INCH, AND 5770 FEET OF 2 INCH POLY ALONG STREETS OF
SOUTHPOINTE PHASE 5 SUBDIVISION. RESIDENTIAL MANSFIELD GROWTH JANUARY
2783 080.68360 23,866
RELOCATE FACILITIES. INSTALL&NBSP; 531 FEET OF 6 INCH POLY AND ABANDON
500 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2784 080.68361 35,987
RELOCATE FACILITIES. INSTALL 1159 FEET OF 2 INCH POLY AND 86 FEET OF 4
INCH POLY AND ABANDON 1153 FEET OF 2 INCH STEEL AND 75 FEET OF 4 INCH
STEEL ALONG BROOKHOLLOW DRIVE TO ACCOMMODATE CITY OF WOODWAY
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WOODWAY
RELOCATION OF
FACILITIES OCTOBER
2785 080.68365 10,550
RELOCATE FACILITIES. INSTALL 360 FEET OF 4 INCH POLY AND ABANDON 360
FEET OF 4 INCH STEEL ALONG MCHILHANEY STREET AND MARY STREET TO
ACCOMMODATE CITY OF STEPHENVILLE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
RELOCATION OF
FACILITIES OCTOBER
2786 080.68373 (12,698)
RELOCATE FACILITIES. INSTALL 600 FEET OF 6-INCH POLY AND ABANDON 1,342
FEET OF 6 INCH POLY AND 221 FEET OF 6 INCH COATED STEEL WITHIN THE ROW
OF MUMFORD ROAD WITHIN THE CITY OF BRYAN, BRAZOS COUNTY DUE TO APT
PROJECT. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES AUGUST
2787 080.68374 49,401
INSTALL 2200 FEET OF 4 INCH POLY AND ABANDON 1050 FEET OF 6 INCH CAST
IRON, 500 FEET OF 4 INCH CAST IRON, 635 FEET OF 4 INCH STEEL ALONG W.
HAMMOND STREET IN FORT WORTH TX IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2788 080.68375 19,102
INSTALL 2200 FEET OF 4 INCH POLY AND ABANDON 1050 FEET OF 6 INCH CAST
IRON AND 500 FEET OF 4 INCH CAST IRON AND 635 FEET OF 4 INCH STEEL ALONG
HAMMOND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2789 080.68385 60,020
INSTALL 1270 FEET OF 2 INCH POLY AND 690 FEET OF 4 INCH POLY AND ABANDON
1270 FEET OF 4 INCH CAST IRON, 340 FEET OF 6 INCH CAST IRON, AND 350 FEET
OF 8 INCH CAST IRON ALONG GLASGOW DRIVE AND MARTINIQUE AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 88 of 178
307
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2790 080.68386 34,037
INSTALL 2035 FEET OF 2 INCH IP POLY AND ABANDON 2035 FEET OF 4 INCH CAST
IRON ALONG HOWARD AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2791 080.68393 80,466
INSTALL 2105 FEET OF 4 INCH POLY AND ABANDON 2090 FEET OF 4 INCH CAST
IRON, 164 FEET OF 4 INCH POLY, AND 96 FEET OF STEEL ALONG WEBER STREET
AND LULU STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2792 080.68395 54,272
INSTALL 1221 FEET OF 4 INCH POLY ABANDON 1042 FEET OF 4 INCH CAST IRON,
178 FEET OF 4 INCH POLY. ALONG DEWEY STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2793 080.68396 65,751
INSTALL 4000 FEET OF 4 INCH OF POLY AND ABANDON 1515 FEET OF 4 INCH CAST
IRON, 560 FEET OF 4 INCH STEEL ALONG W. BOYCE IN FORT WORTH TX IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2794 080.68398 60,247
INSTALL 3642 FEET OF 4 INCH STEEL AND ABANDON 1075 FEET OF 4 INCH CAST
IRON, 1500 FEET OF 6 INCH STEEL, 2567 FEET OF 4 INCH STEEL, 170 FEET OF 4
INCH POLY ALONG AVENUE D IN FORT WORTH, TX IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2795 080.68399 35,183
INSTALL 2103 FEET OF 4 INCH POLY AND ABANDON 1447 FEET OF 4 INCH STEEL,
463 FEET OF 6 INCH STEEL, AND 146 FEET OF 4 INCH CAST IRON ALONG N
COMMERCE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2796 080.68400 32,425
INSTALL 1805 FEET OF 2 INCH POLY AND ABANDON 630 FEET OF 4 INCH CAST
IRON, 735 FEET OF 6 INCH CAST IRON, 385 FEET OF 2 INCH STEEL AND 55 FEET OF
3 INCH STEEL ALONG NORTH RAVINIA STRET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2797 080.68403 34,268
INSTALL 2010 FEET OF 2 INCH POLY AND ABANDON 945 FEET OF 4 INCH CAST IRON
AND 1495 FEET OF 4 INCH STEEL. ALONG MERRIFIELD AVE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2798 080.68404 46,746
INSTALL 1920 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 4 INCH CAST IRON
AND 640 FEET OF 2 INCH STEEL AND 735 FEET OF 2 INCH STEEL AND 25 FEET OF 4
INCH STEEL AND 10 FEET OF 8 INCH STEEL ALONG STRONG STREET AND
WINSTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2799 080.68407 20,345
RELOCATE FACILITIES. INSTALL 880 FEET OF 4 INCH POLY ALONG AVENUE H AND
ABANDON 525 FEET OF 4 INCH AND 490 FEET OF 6 INCH STEEL TO ACCOMMODATE
THE CITY OF GARLAND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
2800 080.68408 1,696
ABANDON DISTRICT REGULATOR STATION #17 IN GATESVILLE IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE SYSTEM INTEGRITY OCTOBER
2801 080.68411 74,200
INSTALL 2300 FEET OF 2 INCH POLY AND ABANDON 2300 FEET OF 4 INCH CAST
IRON ALONG PRESIDIA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2802 080.68416 77,784
INSTALL 1500 FEET OF 4 INCH POLY AND 660 FEET OF 2 INCH POLY AND ABANDON
1230 FEET OF 6 INCH CAST IRON, 560 FEET OF 4 INCH POLY, 300 FEET OF 4 INCH
CAST IRON, AND 135 FEET OF 4 INCH STEEL ALONG W UNIVERSITY BLVD AND
WATEKA DRIVE N ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2803 080.68418 1,901
REPLACE DISTRICT REGULATOR STATION #03 IN MART AND ABANDON EXISTING
DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY OCTOBER
2804 080.68421 53,638
INSTALL 1470 FEET OF 2 INCH POLY AND 230 FEET OF 4 INCH POLY AND ABANDON
1630 FEET OF 4 INCH CAST IRON, 1470 FEET OF 6 INCH CAST IRON, 650 FEET OF 8
INCH CAST IRON AND 175 FEET OF 2 INCH STEEL ALONG BRYAN STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2805 080.68422 172,641
INSTALL 2350 FEET OF 2 INCH POLY AND 560 FEET OF 6 INCH POLY AND ABANDON
2050 FEET OF 6 INCH CAST IRON, 145 FEET OF 4 INCH POLY AND 15 FEET OF 6
INCH POLY ALONG ORAM STREET AND PROSPECT AVENUE&NBSP; IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2806 080.68423 11,827
INSTALL 205 FEET OF 2 INCH POLY AND 1395 FEET OF 4 INCH POLY ALONG
GLENCOE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2807 080.68427 3,204
ABANDON 400 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEONA SYSTEM INTEGRITY OCTOBER
2808 080.68429 197,580
RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH AND 1000 FEET OF 6 INCH
POLY AND 800 FEET OF 16 INCH STEEL ALONG CLEBURNE CROWLEY RD TO
CAPPS ST AND ABANDON 300 FEET OF 4 INCH POLY AND 250 FEET OF 6 INCH
STEEL AND 120 FEET TO ACCOMMODATE CITY OF CLEBURNE STREET PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES DECEMBER
2809 080.68435 9,880
INSTALL DISTRICT REGULATOR STATION #18 IN GATESVILLE AND ABANDON
DISTRICT REGULATOR STATION IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE SYSTEM INTEGRITY OCTOBER
2810 080.68438 8,730
INSTALL 755 FEET OF 2 INCH POLY AND ABANDON 318 FEET OF 2 INCH POLY AND
1598 FEET OF 2 INCH STEEL AND DRS04 ALONG MILL AVENUE IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY OCTOBER
2811 080.68439 11,373
INSTALL REGULATOR STATION #05 ALONG CHURCH STREET AND ABANDON
DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS MOODY SYSTEM INTEGRITY OCTOBER
2812 080.68447 21,122
RELOCATE FACILITIES. INSTALL 752 FEET OF 4 INCH POLY AND ABANDON 103
FEET OF 2 INCH POLY AND 752 FEET OF 4 INCH STEEL AND 320 FEET OF 6 INCH
STEEL ALONG EAST FIRST STREET TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2813 080.68448 21,319
RELOCATE FACILITIES. INSTALL 19 FEET OF 2 INCH POLY AND 15 FEET OF 4 INCH
POLY AND 1120 FEET OF 6 INCH POLY AND ABANDON 10 FEET OF 2 INCH POLY
AND 11 FEET OF 4 INCH POLY AND 1106 FEET OF 6 INCH STEEL ALONG CONWAY
STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2814 080.68453 23
ABANDON 2004 FEET OF 2 INCH STEEL AND 313 FEET OF 2 INCH POLY ALONG
MARSHALL AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER
2815 080.68454 6,113
RELOCATE FACILITIES. INSTALL 301 FEET OF 4 INCH POLY AND ABANDON 285
FEET OF 4 INCH POLY ALONG EAST MAIN STREET TO ACCOMMODATE CITY OF
KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
RELOCATION OF
FACILITIES OCTOBER
2816 080.68465 14,635
INSTALL 38 FEET OF 2 INCH POLY AND 14 FEET OF 4 INCH POLY AND 820 FEET OF
6 INCH POLY AND ABANDON 8 FEET OF 2 INCH STEEL AND 22 FEET OF 2 INCH
POLY AND 557 FEET OF 4 INCH STEEL AND 90 FEET OF 4 INCH POLY AND 155 FEET
OF 6 INCH STEEL AND 40 FEET OF 6 INCH POLY ALONG BRADFORD IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
2817 080.68468 10,711
RELOCATE FACILITIES. INSTALL 770 FEET OF 4 INCH POLY AND ABANDON 742
FEET OF 4 INCH STEEL AND 500 FEET OF 4 INCH POLY ALONG CEDAR AND 3RD
STREET TO ACCOMMODATE CITY OF HEARNE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE
RELOCATION OF
FACILITIES OCTOBER
2818 080.68474 43,242
INSTALL 1590 FEET OF 2 INCH POLY AND ABANDON 2079 FEET OF 4 INCH STEEL
AND 428 FEET OF 4 INCH POLY ALONG DUVAL STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2819 080.68477 20,252
INSTALL 1425 FEET OF 2 INCH POLY AND ABANDON 488 FEET OF 6 INCH STEEL,
1412 FEET OF 4 INCH STEEL, AND 390 FEET OF 2 INCH STEEL AND 200 FEET OF 4
INCH POLY AND 100 FEET OF 2 INCH POLY ALONG ROBERTS STREET&NBSP; IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 89 of 178
308
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2820 080.68482 3,925
INSTALL 1100 FEET OF 4 INCH POLY AND ABANDON 1100 FEET OF 3 INCH STEEL
ALONG COMMERCE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY OCTOBER
2821 080.68485 26,052
INSTALL 1257 FEET OF 2 INCH POLY AND ABANDON 1257 FEET OF 2 INCH POLY
ALONG WILLIAMS AND GOLDEN OAKS TO ACCOMMODATE THE CITY OF
GEORGETOWN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER
2822 080.68486 1,790
INSTALL 7300 FEET OF 4 INCH AND 3500 FEET OF 2 INCH POLY ALONG THE
STREETS OF TANGLEWOOD SUBDIVISION. RESIDENTIAL WOODWAY GROWTH MARCH
2823 080.68487 60,403
RELOCATE FACILITIES. INSTALL1099 FEET OF 12 INCH POLY, 140 FEET OF 4 INCH
POLY AND 105 FEET OF 2 INCH POLY ALONG FAIN DRIVE AND WHEELER STREET
AND ABANDON 1110 FEET OF 12 INCH STEEL, 60 FEET OF 4 INCH STEEL, AND 110
FEET OF 2 INCH POLY TO ACCOMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2824 080.68499 37,613
RELOCATE FACILITIES. INSTALL 1025 FEET OF 2 INCH POLY AND 179 FEET OF 4
INCH POLY AND ABANDON 1104 FEET OF 3 INCH STEEL AND 156 FEET OF 4 INCH
POLY ALONG N 40TH STREET TO ACCOMMODATE CITY OF WACO STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
2825 080.68501 33,146
INSTALL 655 FETT OF 4 INCH POLY AND 600 FEET OF 2 INCH POLY AND ABANDON
655 FEET OF 2 INCH STEEL AND 970 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM SYSTEM INTEGRITY OCTOBER
2826 080.68503 9,560
INSTALL 750 FEET OF 2 INCH POLY ALONG CONCH STREET AND ABANDON 750
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM SYSTEM INTEGRITY OCTOBER
2827 080.68510 51,985
RELOCATE FACILITIES. INSTALL 69 FEET OF 2 INCH POLY AND 410 FEET OF 4 INCH
POLY AND 445 FEET OF 8 INCH POLY AND ABANDON 428 FEET OF 4 INCH STEEL
AND 69 FEET OF 4 INCH POLY AND 452 FEET OF 6 INCH STEEL ALONG COLCORD
AVENUE TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
2828 080.68513 95
ABANDON 458 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER
2829 080.68514 35,270
INSTALL 1705 FEET OF 4 INCH POLY AND ABANDON 751 FEET OF 4 INCH, 403 FEET
OF 2 INCH STEEL, 350 FEET OF 2 INCH, 180 FEET OF 4 INCH POLY AND 308 FEET OF
4 INCH CAST IRON ALONG NE 32ND STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2830 080.68515 38,871
INSTALL 1600 FEET OF 4 INCH POLY AND ABANDON 566 FEET OF 4 INCH CAST IRON
AND 890 FEET OF 4 INCH CAST IRON AND 565 FEET OF 4 INCH POLY ALONG
AVENUE I IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2831 080.68516 30,998
INSTALL 1600 FEET OF 4 INCH POLY AND ABANDON 500 FEET OF 6 INCH CAST
IRON, 850 FEET OF 4 INCH STEEL ALONG AVENUE K IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2832 080.68517 56,294
INSTALL 1817 FEET OF 4 INCH POLY AND ABANDON 667 FEET OF 4 INCH CAST
IRON AND 418 FEET OF 2 INCH POLY AND 266 FEET OF 4 INCH POLY AND 11 FEET
OF 4 INCH STEEL ALONG SHCWARTZ AVENUE AND OSCAR AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2833 080.68518 26,232
INSTALL 1535 FEET OF 4 INCH POLY AND ABANDON 503 FEET OF 4 INCH CAST IRON
AND 958 FEET OF 4 INCH POLY ALONG OSCAR AVENUE IN ACCORDANCE WITH
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2834 080.68519 69,385
INSTALL 5600 FEET OF 4 INCH POLY AND ABANDON 1225 FEET OF 6 INCH CAST
IRON AND 615 FEET OF 3 INCH STEEL ALONG ROSEMONT AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2835 080.68520 5,507
RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH POLY ALONG LAKEVIEW RV
PARK AND ABANDON 3910 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT
WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2836 080.68521 39,236
INSTALL 1900 FEET OF 4 INCH POLY AND ABANDON 1225 FEET OF 6 INCH CAST
IRON AND 615 FEET OF 3 INCH STEEL ALONG ROSEMONT AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2837 080.68522 27,366
INSTALL 1180 FEET OF 4 INCH POLY AND ABANDON 556 FEET OF 6 INCH CAST
IRON, 450 FEET OF 4 INCH STEEL, 192 FEET OF 4 INCH CAST IRON ALONG CURRIE
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2838 080.68523 31,744
INSTALL 1900 FEET OF 4 INCH POLY AND ABANDON 1800 FEET OF 4 INCH CAST
IRON ALONG WILLING AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2839 080.68524 25,433
INSTALL 1175 FEET OF 4 INCH POLY AND ABANDON 1180 FEET OF 6 INCH CAST
IRON ALONG W. GAMBRELL STREET IN FORT WORTH TX IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2840 080.68529 24,252
RELOCATE FACILITIES. INSTALL 1434 FEET OF 6 INCH POLY ALONG LIMOUSINE
PARKWAY AND ABANDON 1354 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY
OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES OCTOBER
2841 080.68534 58,868
INSTALL 1920 FEET OF 2 INCH POLY AND ABANDON 1820 FEET OF 8 INCH CAST
IRON ALONG MARQUETTE STREET IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2842 080.68536 81,124
INSTALL 2695 FEET OF 2 INCH POLY AND ABANDON 945 FEET OF 4 INCH CAST
IRON, 765 FEET OF 6 INCH CAST IRON, 1505 FEET OF 8 INCH CAST IRON, 880 FEET
OF 4 INCH POLY AND 20 FEET OF 8 INCH POLY ALONG CENTENARY AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2843 080.68541 50,693
INSTALL 458 FEET OF 6 INCH POLY AND ABANDON 425 FEET OF 6 INCH POLY
ALONG SH360 AND MAYFIELD ROAD IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
2844 080.68546 6,635
INSTALL ANODES AND ABANDON ANODES ALONG GREEN STREET IN LONGVIEW,
TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER
2845 080.68561 566
RELOCATE FACILITIES. ABANDON 285 FEET OF 6 INCH POLY ALONG KELLER
HASLET ROAD IN FORT WORTH, TX TO ACCOMODATE THE CITY OF FORT WORTH
STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2846 080.68562 3,338
INSTALL 304 FEET OF 2 INCH POLY ALONG HWY 80 AND FM 2208 IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER
2847 080.68564 39,690
RELOCATE FACILITIES. INSTALL 620 FEET OF 6 INCH, 860 FEET OF 4 INCH AND 90
FEET OF 2 INCH POLY ALONG UNIVERSITY PARKS & WEBSTER AVE AND ABANDON
291 FEET OF 6 INCH STEEL AND 768 FEET OF 6 INCH POLY AND 328 FEET OF 6
INCH STEEL TO ACCOMMODATE CITY OF WACO STREET PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
2848 080.68566 14,986
RELOCATE FACILITIES. INSTALL 148 FEET OF 4 INCH POLY AND ABANDON 140
FEET OF 4 INCH POLY ALONG SUNDOWN BOULEVARD AND TEASLEY LANE TO
ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
2849 080.68571 1,845
REPLACE DISTRICT REGULATOR STATION #04 IN MART AND ABANDON EXISTING
DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY OCTOBER
2850 080.68574 2,082,116
INSTALL 4500 FEET OF 16 INCH STEEL ALONG PIPELINE ROAD AND ABANDON 4500
FEET OF 16 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY DECEMBER
2851 080.68576 2,861,959
RELOCATE FACILITIES. INSTALL 5000 FEET OF 16 INCH STEEL ALONG PIPELINE
ROAD AND ABANDON 5000 FEET OF 16 INCH STEEL TO ACCOMMODATE CITY OF
EULESS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 90 of 178
309
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2852 080.68582 53,758
INSTALL 1280 FEET OF 2 INCH POLY AND ABANDON 1280 FEET OF 4 INCH CAST
IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2853 080.68583 37,998
INSTALL 1400 FEET OF 2 INCH POLY AND ABANDON 1045 FEET OF 2 INCH STEEL
ALONG SOUTH OF NORTHVIEW FROM MIDWAY EAST IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2854 080.68586 42,921
INSTALL 1820 FEET OF 2 INCH POLY AND ABANDON 1325 FEET OF 2 INCH STEEL
ALONG THE ALLEY NORTH OF CEDARBRUSH FROM COX LN EAST IN ACCORDANCE
WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2855 080.68597 828
INSTALL 2030 FEET OF 6 INCH POLY AND 4200 FEET 4 INCH POLY ALONG 161 PARK
IN DFW AIRPORT IRVING TX. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL IRVING GROWTH MARCH
2856 080.68609 711
ABANDON 211 FEET OF 3 INCH STEEL AND 991 FEET OF 4 INCH STEEL AND 41
FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CALVERT SYSTEM INTEGRITY OCTOBER
2857 080.68619 41,461
INSTALL 2290 FEET OF 2 INCH POLY AND ABANDON 990 FEET OF 4 INCH CAST
IRON, 940 FEET OF 4 INCH POLY, 15 FEET OF 6 INCH POLY, 10 FEET OF 8 INCH
POLY, 330 FEET OF 2 INCH STEEL AND 5 FEET OF 2 INCH STEEL ALONG SONORA
AVENUE AND OPAL AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2858 080.68622 64,164
INSTALL 1520 FEET OF 2 INCH POLY AND 1310 FEET OF 4 INCH POLY AND
ABANDON 415 FEET OF 4 INCH CAST IRON, 95 FEET OF 4 INCH POLY AND 1055
FEET OF 4 INCH STEEL ALONG IOWA AVENUE AND GEORGIA AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2859 080.68623 39,863
INSTALL 1640 FEET OF 4 INCH POLY AND ABANDON 1640 FEET OF 8 INCH CAST
IRON ALONG CARPENTER AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2860 080.68628 80,193
INSTALL 600 FEET OF 10 INCH STEEL AND ABANDON 486 FEET OF 10 INCH STEEL
ALONG NEW YORK AVENUE AND BARDIN ROAD IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
2861 080.68635 27,797
INSTALL DISTRICT REGULATOR STATION 02 ALONG EAST ELM STREET AND SOUTH
MAIN STREET AND ABANDON DISTRICT REGULATOR STATION 02 IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST SYSTEM INTEGRITY OCTOBER
2862 080.68646 36,444
INSTALL 1465 FEET OF 2 INCH POLY ALONG ROYAL CHAPEL DRIVE AND ABANDON
1465 FEET OF 2 INCH STEEL IN ACCORDANC WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2863 080.68650 106,980
INSTALL 2400 FEET OF 2 INCH POLY ALONG WILDFLOWER DRIVE AND ABANDON
2400 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2864 080.68652 17,465
INSTALL 1075 FEET OF 6 INCH POLY AND ABANDON 5 FEET OF 4 INCH CAST IRON,
1040 FEET OF 8 INCH CAST IRON, 240 FEET OF 3 INCH STEEL AND 15 FEET OF 4
INCH STEEL ALONG S HASKELL AVENUE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2865 080.68655 33,619
INSTALL 1245 FEET OF 4 INCH POLY AND ABANDON 1245 FEET OF 3 INCH STEEL
ALONG GOODYEAR DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2866 080.68656 63,708
INSTALL 1750 FEET OF 2 INCH AND 300 FEET OF 4 INCH POLY ALONG PONDER DR.
AND ABANDON 1750 FEET OF 2 INCH AND 300 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2867 080.68657 81,570
INSTALL 1415 FEET OF 2 INCH POLY AND 845 FEET OF 4 INCH POLY AND ABANDON
1270 FEET OF 4 INCH CAST IRON AND 795 FEET OF 6 INCH CAST IRON IN
ACORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2868 080.68659 33,974
INSTALL 1550 FEET OF 2 INCH POLY AND 545 FEET OF 4 INCH POLY AND ABANDON
1280 FEET OF 2 INCH CAST IRON, 190 FEET OF 4 INCH CAST IRON, 15 FEET OF 2
INCH POLY, 105 FEET OF 4 INCH POLY, 15 FEET OF 6 INCH POLY, 10 FEET OF 8
INCH POLY, 275 FEET OF 2 INCH STEEL AND 15 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2869 080.68682 48,179
INSTALL 1015 FEET OF 2 INCH, 350 FEET OF 4 INCH AND 180 FEET OF 6 INCH POLY
ALONG WARD AND ABANDON 1288 FEET OF 4 INCH AND 270 FEET OF 2 INCH STEEL
AND 116 FEET OF 6 INCH STEEL AND 656 FEET OF 3 INCH POLY IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY OCTOBER
2870 080.68694 43,199
INSTALL 1900 FEET OF 2 INCH POLY AND ABANDON 1700 FEET OF 4 INCH CAST
IRON ALONG TOLUCA ABENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2871 080.68696 12,656
RELOCATE FACILITIES. INSTALL 1550 FEET OF 4 INCH POLY ALONG DAVID DR AND
ABANDON 5 FEET OF 4 INCH AND 1010 FEET OF 2 INCH POLY TO ACCOMMODATE
THE CITY OF BEDFORD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BEDFORD
RELOCATION OF
FACILITIES OCTOBER
2872 080.68698 24,721
RELOCATE FACILITIES. INSTALL 1400 FEET OF 4 INCH AND 80 FEET OF 2 INCH
POLY ALONG SUFFOLK DRIVE AND ABANDON 1400 FEET OF 4 INCH AND 80 FEET
OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2873 080.68704 37,234
INSTALL 700 FEET OF 2 INCH POLY AND 740 FEET OF 4 INCH POLY AND ABANDON 5
FEET OF 3 INCH CAST IRON, 1670 FEET OF 4 INCH CAST IRON, 80 FEET OF 6 INCH
CAST IRON, 825 FEET OF 8 INCH CAST IRON AND 155 FEET OF 8 INCH CAST IRON
ALONG MCKINNEY AVENUE AND TRAVIS STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2874 080.68705 83,836
INSTALL 625 FEET OF 2 INCH AND 1120 FEET OF 4 INCH POLY AND ABANDON 1205
FEET OF 4 INCH, 350 FEET OF 6 INCH CAST IRON, 75 FEET OF 4 INCH POLY AND 45
FEET OF 4 INH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2875 080.68709 9,101
INSTALL 1,050 FEET OF 4 INCH POLY ALONG BOMBER DRIVE TO SERVE BRYAN
SUPERPARK DUE TO CUSTOMER GROWTH. DEVELOPER INSTALLED FACILITY
COMMERCIAL OR
INDUSTRIAL BRYAN GROWTH JUNE
2876 080.68711 37,429
INSTALL 1820 FEET OF 2 INCH POLY ALONG HARLANDALE AVENUE AND S EWING
AVENUE AND ABANDON 35 FEET OF 4 INCH CAST IRON, 20 FEET OF 2 INCH POLY,
1240 FEET OF 2 INCH STEEL AND 500 FEET OF 6 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2877 080.68712 3,697
RELOCATE FACILITIES. INSTALL 126 FEET OF 2 INCH POLY AND ABANDON 28 FEET
OF 2 INCH STEEL AND 63 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
RELOCATION OF
FACILITIES OCTOBER
2878 080.68713 69,746
INSTALL 3435 FEET OF 2 INCH POLY AND ABANDON 1570 FEET OF 4 INCH AND 1600
FEET OF 6 INCH CAST IRON AND 280 FEET OF 2 INCH STEEL ALONG VERMONT
AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2879 080.68714 33,081
INSTALL 1860 FEET OF 2 INCH POLY AND ABANDON 1285 FEET OF 4 INCH CAST
IRON AND 580 FEET OF 4 INCH POLY ALONG VERNON AVENUE IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2880 080.68717 12,463
RELOCATE FACILITIES. INSTALL 285 FEET OF 6 INCH POLY ALONG MCLEROY BLVD
AND ABANDON 285 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF
SAGINAW IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS SAGINAW
RELOCATION OF
FACILITIES OCTOBER
2881 080.68724 3,866
RELOCATE FACILITIES. INSTALL 15 FEET OF 2 INCH POLY AND 70 FEET OF 4 INCH
POLY AND ABANDON 12 FEET OF 2 INCH POLY AND 22 FEET OF 3 INCH STEEL AND
44 FEET OF 3 INCH POLY ALONG COTTAGE STREET TO ACCOMMODATE CITY OF
KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
RELOCATION OF
FACILITIES OCTOBER
2882 080.68727 (133,854)
INSTALL 5000 FEET OF 6 INCH POLY ALONG VILLA MARIA ROAD AND DISTRICT
REGULATOR STATION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS BRYAN GROWTH AUGUST
2883 080.68732 15,847
INSTALL 680 FEET OF 4 INCH POLY AND ABANDON 10 FEET OF 2 INCH AND 173
FEET OF 2 INCH POLY 180 FEET OF 3 INCH AND 309 FEET OF 2 INCH STEEL ALONG
N. 13TH AND TREADAWAY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 91 of 178
310
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2884 080.68733 7,097
INSTALL 423 FEET OF 4 INCH POLY AND ABANDON 330 FEET OF 6 INCH STEEL
AND 55 FEET OF 6 INCH POLY ALONG 8TH AND 9TH STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2885 080.68746 1,762
INSTALL 8740 FEET OF 2 INCH AND 2700 FEET OF 4 INCH POLY ALONG THE
STREETS OF IRON HORSE VILLAGE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MESQUITE GROWTH APRIL
2886 080.68747 20,698
INSTALL 844 FEET OF 2 INCH POLY ALONG PECK STREET AND ABANDON 4219
FEET OF 4 INCH AND 489 FEET OF 2 INCH STEEL AND 103 FEET OF 4 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER
2887 080.68748 1,716
ABANDON 581 FEET OF 4 INCH STEEL AND 230 FEET OF 4 INCH POLY ALONG
MARSHALL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER
2888 080.68749 52,796
INSTALL 1480 FEET OF 4 INCH AND 70 FEET OF 2 INCH POLY AND ABANDON 1720
FEET OF 4 INCH STEEL AND 3195 FEET OF 2 INCH STEEL AND 82 FEET OF 4 INCH
POLY, 701 FEET OF 2 INCH POLY AND 55 FEET OF 1.25 INCH POLY ALONG
PRINCETON AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2889 080.68750 10,411
INSTALL 860 FEET OF 2 INCH POLY AND ABANDON 1141 FEET OF 2 INCH STEEL
AND 297 FEET OF 2 INCH POLY ALONG WICHITA STREET IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2890 080.68751 57,243
INSTALL 1800 FEET OF 4 INCH POLY ALONG INDIAN TRAIL AND ABANDON 1800
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2891 080.68759 25,011
INSTALL 860 IF 4 INCH AAND 400 FEET OF 2 INCH POLY AND ABANDON 261 FEET
OF 2 INCH STEEL AND 748 FEET OF 4 INCH STEEL ALONG 2ND STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM SYSTEM INTEGRITY OCTOBER
2892 080.68764 27,548
INSTALL 120 FEET OF 8 INCH POLY AND ABANDON 675 FEET OF 6 INCH STEEL
ALONG BROWN TRAIL IN HURST IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY OCTOBER
2893 080.68766 35,500
INSTALL 2324 FEET OF 4 INCH POLY AND ABANDON 885 FEET OF 2 INCH POLY, 775
FEET OF 4 INCH CAST IRON, 640 FEET OF 2 INCH STEEL, 398 FEET OF 3 INCH
STEEL, 302 FEET OF 6 INCH POLY AND 128 FEET OF 6 INCH STEEL ALONG 29TH
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2894 080.68792 46,689
INSTALL 2100 FEET OF 2 INCH POLY ALONG CHAPEL DOWNS DRIVE AND ABANDON
1900 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2895 080.68793 51,971
INSTALL 1900 FEET OF 4 INCH POLY ALONG CHAPEL DOWNS DRIVE & TIMBERVIEW
ROAD AND ABANDON 1900 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2896 080.68794 88,182
INSTALL 255 FEET OF 2 INCH POLY AND 1750 FEET OF 4 INCH POLY AND ABANDON
225 FEET OF 2 INCH STEEL AND 1810 FEET OF 3 INCH STEEL
ALONG TIMBERVIEW ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2897 080.68798 21,036
INSTALL 725 FEET OF 4 INCH POLY AND ABANDON 384 FEET OF 4 INCH STEEL, 336
FEET OF 4 INCH CAST IRON, 57 FEET OF 4 INCH POLY ALONG OSCAR AVENUE AND
HUTCHINSON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2898 080.68799 31,139
ABANDON 565 FEET OF 4 INCH STEEL AND 445 FEET OF 4 INCH CAST IRON AND
160 FEET OF 6 INCH POLY ALONG CLINTON STEET AND HOUSTON STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2899 080.68800 25,622
INSTALL 1365 FEET OF 4 INCH POLY AND ABANDON 1365 FEET OF 4 INCH CAST
IRON ALONG WETWOOD AVENUE AND N BAILEY AVENUE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2900 080.68803 31,744
INSTALL 1093 FEET OF 4 INCH POLY AND ABANDON 451 FEET OF 4 INCH CAST IRON
AND 330 FEET OF 4 INCH STEE ALONG SCHWARTZ AVENUE. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2901 080.68804 54,075
INSTALL 2900 FEET OF 4 INCH POLY AND ABANDON 630 FEET OF 4 INCH CAST
IRON, 1090 FEET OF 4 INCH STEEL, 705 FEET OF 4 INCH POLY ALONG ANTHONY
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2902 080.68807 8,899
INSTALL 365 FEET OF 6 INCH POLY AND ABANDON 376 FEET OF 6 INCH STEEL
ALONG BELTLINE ROAD AND PIONEER DRIVE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER
2903 080.68809 9,249
RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH POLY ALONG W. CHURCH
STREET AND ABANDON 300 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY
OF CLARKSVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CLARKSVILLE
RELOCATION OF
FACILITIES OCTOBER
2904 080.68810 24,637
INSTALL 1053 FEET OF 2 INCH POLY AND ABANDON 1185 FEET OF 2 INCH STEEL
AND 15 FEET OF 2 INCH POLY ALONG PULLEN AND E 2ND STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY OCTOBER
2905 080.68812 24,819
RELOCATE FACILITIES. INSTALL 1,152 FEET OF 2 INCH POLY, 177 FEET OF 4 INCH
POLY, 1,319 FEET OF 6 INCH POLY ALONG PATTERSON LANE AND ABANDON 56
FEET OF 2 INCH POLY, 208 FEET OF 3 INCH POLY, 267 FEET OF 6 INCH POLY TO
ACCOMMODATE THE CITY OF COLLEYVILLE STREET PROJECT IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
RELOCATION OF
FACILITIES OCTOBER
2906 080.68813 41,244
INSTALL 720 FEET OF 6 INCH POLY AND ABANDON 280 FEET OF 3 INCH STEEL AND
1276 FEET OF 4 INCH STEEL AND 549 FEET OF 4 INCH POLY ALONG N 1ST AND
GARFIELD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY OCTOBER
2907 080.68814 10,977
RELOCATE FACILITIES. INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 400
FEET OF 2 INCH STEEL ALONG LEE STREET TO ACCOMMODATE THE CITY OF
EVERMAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS EVERMAN
RELOCATION OF
FACILITIES OCTOBER
2908 080.68816 4,878
INSTALL 460 FEET OF 2 INCH POLY AND ABANDON 548 FEET OF 2 INCH STEEL AND
259 FEET OF 2 INCH POLY ALONG 4TH AND MAPLE STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GUNTER SYSTEM INTEGRITY OCTOBER
2909 080.68821 41,166
INSTALL 975 FEET OF 10 INCH STEEL AND ABANDON 975 FEET OF 10 INCH STEEL
ALONG LONG BRANCH CIRCLE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BARDWELL SYSTEM INTEGRITY OCTOBER
2910 080.68823 66,550
INSTALL 2450 FEET OF 4 INCH POLY AND ABANDON 2430 FEET OF 6 INCH CAST
IRON, 430 FEET OF 6 INCH POLY ALONG HENDERSON STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2911 080.68828 32,814
INSTALL 1451 FEET OF 4 INCH POLY AND ABANDON 1577 FEET OF 4 INCH CAST
IRON ALONG BAILEY AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2912 080.68830 25,320
INSTALL 1475 FEET OF 2 INCH POLY AND ABANDON 1425 FEET OF 6 INCH CAST
IRON AND 360 FEET OF 6 INCH POLY ALONG FOGG STREET IN ACCORDANCE WITH
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2913 080.68831 46,103
INSTALL 1542 FEET OF 4 INCH POLY AND ABANDON 1200 FEET OF 4 INCH CAST
IRON, 342 FEET OF 4 INCH POLY ALONG DEWEY STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2914 080.68833 31,230
INSTALL 1030 FEET OF 4 INCH POLY AND ABANDON 771 FEET OF 4 INCH AND 264
FEET OF 4 INCH CAST IRON ALONG DEEN ED ROAD IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2915 080.68848 2,746
RELOCATE FACILITIES. INSTALL 20 FEET OF 2 INCH POLY AND ABANDON 20 FEET
OF 2 INCH POLY ALONG MINGO STREET TO ACCOMMODATE THE CITY OF DALLAS
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2916 080.68863 8,747
INSTALL 1020 FEET OF 2 INCH POLY AND ABANDON 550 FEET 2 INCH STEEL AND
560 FEET OF 2 INCH POLY ALONG ARTHUR STREET AND EAST 1ST IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 92 of 178
311
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2917 080.68868 38,372
INSTALL 1695 FEET OF 2 INCH POLY AND ABANDON 1160 FEET OF 3 INCH STEEL,
560 FEET OF 2 INCH STEEL AND 148 FEET OF 1.25 INCH STEEL AND 895 FEET OF 2
INCH POLY AND 20 FEET OF 1.25 INCH POLY ALONG NORTH PENN STREET IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY OCTOBER
2918 080.68869 12,187
INSTALL 910 FEET OF 2 INCH POLY ALONG NORTH TEXOWA STREET AND
ABANDON 761 FEET OF 3 INCH STEEL AND 137 FEET OF 3 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY OCTOBER
2919 080.68871 8,801
RELOCATE FACILITIES. INSTALL 785 FEET OF 4 INCH POLY ALONG ROCKHILL ROAD
AND ABANDON 730 FEET OF 3 INCH IP STEEL, 30 FEET OF 3 INCH IP POLY AND 25
FEET OF 4 INCH IP POLY TO ACCOMMODATE THE CITY OF MCKINNEY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES OCTOBER
2920 080.68873 45,367
RELOCATE FACILITIES. INSTALL 920 FEET OF 6 INCH, 200 FEET OF 4 INCH POLY
ALONG BOSQUE AND ABANDON 920 FEET OF 6 INCH, 10 FEET OF 8 INCH AND 10
FEET OF 4 INCH STEEL AND 65 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
WACO STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
2921 080.68874 1,977
INSTALL DISTRICT REGULATOR STATION IN BRYAN ALONG NUCHES LANE AND
SCOTT STREET AND ABANDON DISTRICT REGULATOR STATION ML-21 IN
ACCORDANCE WITH THE RAILRAOD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
2922 080.68877 10,337
RELOCATE FACILITIES. INSTALL 173 FEET OF 2 INCH POLY AND 84 FEET OF 4 INCH
POLY AND ABANDON 4 FEET OF 1.25 INCH POLY AND 80 FEET OF 2 INCH STEEL
AND 72 FEET OF 2 INCH POLY AND 69 FEET OF 3 INCH STEEL AND 80 FEET OF 4
INCH STEEL ALONG AVE M TO ACCOMMODATE CITY OF TEMPLE STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
RELOCATION OF
FACILITIES OCTOBER
2923 080.68890 20,967
INSTALL 4200 FEET OF 6 INCH POLY ALONG CLEM ROAD. DEVELOPER INSTALLED
FACILITIES. ALL CUSTOMERS ROCKWALL GROWTH JUNE
2924 080.68891 643
INSTALL 2475 FEET OF 6 INCH AND 2481 FEET OF 4 INCH POLY ALONG THE
STREETS OF NORTHLINE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH APRIL
2925 080.68918 33,992
INSTALL 1,483 FEET OF 8 INCH AND 487 FEET OF 6 INCH POLY ALONG THE
STREETS OF NORTHLINE IN LEANDER. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LEANDER GROWTH SEPTEMBER
2926 080.68919 13,086
INSTALL 1800 FEET OF 4 INCH POLY AND ABANDON 3000 FEET OF 3 INCH STEEL
ALONG COMMERCE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY OCTOBER
2927 080.68923 12,177
INSTALL 911 FEET OF 2 INCH POLY AND ABANDON 119 FEET OF 2 INCH STEEL
AND 134 FEET OF 3 INCH STEEL AND 64 FEET OF 3 INCH POLY AND 527 FEET OF 4
INCH STEEL ALONG HUGHES STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY OCTOBER
2928 080.68924 43,739
INSTALL 500 FEET OF 4 INCH POLY AND 1000 FEET OF 2 INCH POLY AND ABANDON
615 FEET OF 2 INCH IP AND 875 FEET OF 3 INCH STEEL ALONG ALTA VIST DRIVE IN
ACCORDANCE WITH RAILROAD OCMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
2929 080.68927 120,357
RELOCATE FACILITIES. INSTALL 615 FEET OF 2 INCH POLY, 834 FEET OF 4 INCH
POLY, 3050 FEET OF 6 INCH POLY ALONG TXDOT SH205 TO ACCOMMODATE CITY
OF TERRELL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL
RELOCATION OF
FACILITIES OCTOBER
2930 080.68931 7,000
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY ALONG HWY 180 AND
ABANDON 500 FEET OF 3 INCH
POLY TO ACCOMMODATE TXDOT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY
RELOCATION OF
FACILITIES OCTOBER
2931 080.68954 25,261
INSTALL 40 FEET OF 8 INCH, 80 FEET OF 12 INCH AND 40 FEET OF 20 INCH STEEL
AND DISTRICT REGULATOR STATION ALONG FORD ROAD AND ABANDON 120 FEET
OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
2932 080.68956 47,116
INSTALL 1845 FEET OF 2 INCH POLY ALONG CRESTWOOD DR AND ABANDON 1690
FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
2933 080.68957 8,574
INSTALL 620 FEET OF 4 INCH POLY ALONG HUACO LANE AND ABANDON 620 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
2934 080.68958 15,971
INSTALL 50 FEET OF 12 INCH POLY, 200 FEET OF 8 INCH POLY, 134 FEET OF 4 INCH
POLY AND 20 FEET OF 6 INCH POLY AND ABANDON 39 FEET OF 10 INCH STEEL, 292
FEET OF 8 INCH STEEL AND 155 FEET OF 3 INCH STEEL AND 128 FEET OF 3 INCH
POLY ALONG S. 27TH AND SANTA MONICA IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
2935 080.68960 19,943
INSTALL 1200 FEET OF 4 INCH POLY ALONG OLDHAM LANE AND ABANDON 465
FEET OF 4 INCH AND 1058 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
2936 080.68990 16,100
INSTALL 940 FEET OF 6 INCH POLY ALONG MONTECITO AND ABANDON 940 FEET
OF 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
2937 080.68991 13,540
INSTALL 825 FEET OF 2 INCH POLY ALONG ARDATH AND ABANDON 882 FEET OF 4
INCH STEEL AND 80 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
2938 080.68996 67,023
INSTALL 4150 FEET OF 4 INCH POLY ALONG ELIZABETH AVENUE AND ABANDON
550 FEET OF 6 CAST IRON, 600 FEET OF 6 INCH STEEL, 900 FEET OF 4 INCH STEEL,
950 FEET OF 6 INCH POLY, 1550 FEET OF 4 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2939 080.69000 51,678
INSTALL 2200 FEET OF 4 INCH POLY AND ABANDON 1550 FEET OF 4 INCH CAST
IRON, 105 FEET OF 4 INCH STEEL ALONG BALDWIN AVENUE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2940 080.69006 25,486
INSTALL 1675 FEET OF 4 INCH POLY AND ABANDON 188 FEET OF 4 INCH STEEL,
1120 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2941 080.69008 34,272
INSTALL 1775 OF 4 INCH POLY AND ABANDON 2055 FEET OF 6 INCH CAST IRON
ALONG GAMBRELL STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2942 080.69010 3,638
INSTALL 3 LONGSIDE SERVICE LINES AND ABANDON 3 LONGSIDE TO
ACCOMMODATE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2943 080.69011 35,955
INSTALL 1930 FEET OF 4 INCH POLY AND ABANDON 1865 FEET OF 4 INCH CAST
IRON ALONG 27TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2944 080.69012 26,631
INSTALL 1483 FEET OF 4 INCH POLY AND ABANDON 685 FEET OF 4 INCH CAST
IRON, 501 FEET OF 4 INCH POLY, 79 FEET OF 6 INCH POLY ALONG CLIFF STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2945 080.69013 30,128
INSTALL 1650 FEET OF 4 INCH POLY AND ABANDON 1600 FEET OF 6 INCH CAST
IRON ALONG GAMBRELL STREET IN ACCORDACNE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2946 080.69014 103,511
INSTALL 2185 FEET OF 2 INCH POLY ALONG WILDER STREET AND ABANDON 1590
FEET OF 4 INCH CAST IRON AND 465 FEET OF 6 INCH CAST IRON IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2947 080.69015 57,985
INSTALL 1540 FEET OF 2 INCH POLY AND 775 FEET OF 4 INCH POLY AND ABANDON
690 FEET OF 4 INCH CAST IRON AND 1570 FEET OF 6 INCH CAST IRON ALONG
MARYLAND AVENUE AND MARSALIS AVENUE IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2948 080.69016 56,854
INSTALL 1695 FEET OF 2 INCH POLY AND ABANDON 1670 FEET OF 6 INCH CAST
IRON ALONG TERRACE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2949 080.69024 79,158
INSTALL 2898 FEET OF 2 INCH POLY AND ABANDON 3375 FEET OF 2 INCH STEEL
ALONG CALYPSO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 93 of 178
312
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2950 080.69026 101,969
INSTALL 2553 FEET OF 2 INCH POLY AND ABANDON 2451 FEET OF 2 INCH STEEL
AND 110 FEET OF 2 INCH POLY ALONG ANGELINA STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2951 080.69051 129,425
INSTALL 2650 FEET OF 2 INCH POLY ALONG LEATH AND ABANDON 2650 FEET OF 2
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2952 080.69052 175,472
INSTALL 200 FEET OF 2 INCH AND 3315 FEET OF 4 INCH POLY ALONG BAYSIDE AND
ABANDON 3500 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2953 080.69056 42,058
INSTALL 285 FEET OF 2 INCH AND 2000 FEET OF 4 INCH POLY AND ABANDON 285
FEET OF 4 INCH, 1745 FEET OF 8 INCH CAST IRON AND 255 FEET OF 8 INCH POLY
ALONG SAMUELL BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2954 080.69057 43,304
INSTALL 1435 FEET OF 2 INCH POLY AND ABANDON 1415 FEET OF 6 INCH CAST
IRON ALONG MCNEIL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2955 080.69061 10,714
RELOCATE FACILITIES. INSTALL 25 POLY SERVICES AND ABANDON 25 POLY
SERVICES ALONG KIRKMEADOW LANE TO ACCOMMODATE THE CITY OF DALLAS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
2956 080.69068 374
INSTALL 913 FEET OF 4 INCH AND 1,113 FEET OF 2 INCH POLY ALONG THE
STREETS OF MEADOW PARK SUBDIVISION. RESIDENTIAL FORT WORTH GROWTH MARCH
2957 080.69077 17,169
RELOCATE FACILITIES. INSTALL 1840 FEET OF 4 INCH POLY ALONG LONGHORN
TRAIL AND ABANDON 1840 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF
CROWLEY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CROWLEY
RELOCATION OF
FACILITIES OCTOBER
2958 080.69089 11,857
INSTALL DISTRICT REGULATOR STATION ALONG THE STREETS OF N MILLER
AVENUE AND NE 3RD STREET AND ABANDON DISTRICT REGULATOR STATION 06 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HUBBARD SYSTEM INTEGRITY OCTOBER
2959 080.69101 4,838
RELOCATE FACILITIES. INSTALL 86 FEET OF 4 INCH POLY AND ABANDON 79 FEET
OF 4 INCH POLY TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT
PROJECT ALONG OLYMPIC DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
RELOCATION OF
FACILITIES OCTOBER
2960 080.69113 1,264
ABANDON DISTRICT REGULATOR STATION #130 IN DALLAS IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2961 080.69116 44,032
RELOCATE FACILITIES. INSTALL 2181 FEET OF 6 INCH POLY ALONG FM 455 AND
ABANDON 2131 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF SANGER
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
2962 080.69125 8,114
INSTALL DISTRICT REGULATOR STATION 01 ALONG THE MARY STREET AND
ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MORGAN SYSTEM INTEGRITY OCTOBER
2963 080.69138 543
ABANDON 413 FEET OF 2 INCH STEEL AND 250 FEET OF 2 INCH POLY ALONG
MARKET AND BROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS
UNICORPORATED COUNTY
AREA, (GOODLET) SYSTEM INTEGRITY OCTOBER
2964 080.69159 23,842
INSTALL 2150 FEET OF 4 INCH POLY AND ABANDON 1375 FEET OF 4 INCH CAST
IRON, 540 FEET OF 6 INCH CAST IRON, 265 FEET OF 6 INCH STEEL ALONG BEDDELL
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2965 080.69161 18,979
INSTALL 1300 FEET OF 4 INCH POLY AND ABANDON 1550 FEET OF 4 INCH CAST
IRON ALONG BEDDELL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2966 080.69162 20,595
INSTALL 2009 FEET OF 4 INCH POLY AND ABANDON 813 FEET OF 4 INCH STEEL
AND 1007 FEET OF 4 INCH POLY ALONG CLIFF STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2967 080.69164 8,461
INSTALL 285 FEET OF 4 INCH POLY ALONG COOKE AND ABANDON 285 FEET OF 4
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXA RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
2968 080.69167 26,910
INSTALL 1405 FEET OF 2 INCH AND 820 FEET OF 4 INCH POLY AND ABANDON 925
FEET OF 2 INCH, 1195 FEET OF 4 INCH CAST IRON AND 105 FEET OF 4 INCH POLY
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2969 080.69168 42,619
INSTALL 1375 FEET OF 2 INCH POLY ALONG LLANO AVENUE AND ABANDON 1365
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2970 080.69169 72,023
INSTALL 1945 FEET OF 2 INCH POLY AND ABANDON 1900 FEET OF 4 INCH CAST
IRON ALONG VELASCO AVENUE IN ACCORDANE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2971 080.69170 2,363 REPLACE FARM TAP AND 5 FEET OF STEEL ALONG LINE W7. ALL CUSTOMERS JUSTIN SYSTEM INTEGRITY JUNE
2972 080.69171 42,210
INSTALL 2135 FEET OF 2 INCH POLY AND ABANDON 1695 FEET OF 4 INCH CAST
IRON, 480 FEET OF 8 INCH CAST IRON AND 170 FEET OF 4 INCH STEEL ALONG
FITZHUGH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2973 080.69172 103,419
INSTALL 60 FEET OF 2 INCH AND 2115 FEET OF 4 INCH POLY AND ABANDON 190
FEET OF 4 INCH, 1675 FEET OF 8 INCH CAST IRON, 135 FEET OF 8 INCH POLY AND
105 FEET OF 8 INCH STEEL ALONG WASHINGTON AVENUE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2974 080.69173 94,302
INSTALL 185 FEET OF 2 INCH POLY, 925 FEET OF 4 INCH POLY AND ABANDON 510
FEET OF 4 INCH CAST IRON, 410 FEET OF 6 INCH CAST IRON, 1675 FEET OF 8 INCH
CAST IRON, 160 FEET OF 2 INCH STEEL AND 155 FEET OF 3 INCH STEEL ALONG
PEAK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2975 080.69176 20,218
INSTALL 1670 FEET OF 2 INCH POLY AND 345 FEET OF 4 INCH POLY AND ABANDON
1670 FEET OF 4 INCH CAST IRON AND 345 FEET OF 8 INCH CAST IRON ALONG
STANFORD AVENUE AND AMHERST AVENUE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2976 080.69177 71,690
INSTALL 1925 FEET OF 2 INCH POLY ALONG DELMAR AVENUE AND ABANDON 1850
FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2977 080.69178 61,668
INSTALL 500 FEET OF 6 INCH AND 2200 FEET OF 4 INCH POLY AND ABANDON 2075
FEET OF 4 INCH CAST IRON, 500 FEET OF 8 INCH CAST IRON AND 50 FEET OF 4
INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2978 080.69179 52,775
INSTALL 1850 FEET OF 2 INCH POLY AND ABANDON 765 FEET OF 4 INCH CAST
IRON, 995 FEET OF 8 INCH CAST IRON ALONG ELMWOOD BLVD IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2979 080.69180 40,714
INSTALL 2020 FEET OF 2 INCH POLY ALONG BRITTON DRIVE AND ABANDON 1980
FEET OF 4 INCH CAST IRON, 30 FEET OF 6 INCH CAST IRON AND 10 FEET OF 6 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2980 080.69181 58,626
INSTALL 1750 FEET OF 4 INCH POLY AND RETIRE 1275 FEET OF 4 INCH CAST IRON
AND 500 FEET OF 4 INCH STEEL ALONG AVENUE J IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2981 080.69205 17,743
INSTALL 890 FEET OF 2 INCH POLY AND ABANDON 540 FEET OF 8 INCH CAST IRON
MAIN ALONG BOEDECKER DRIVE AND N CENTERAL EXPY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2982 080.69206 83,741
INSTALL 1390 FEET OF 2 INCH POLY, 725 FEET OF 4 INCH POLY ALONG
BRIARWOOD LANE AND ABANDON 1390 FEET OF 4 INCH CAST IRON AND 725 FEET
OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2983 080.69207 47,521
INSTALL 2275 FEET OF 2 INCH POLY, 200 FEET OF 6 INCH POLY AND ABANDON 300
FEET OF 4 INCH CAST IRON, 1940 FEET OF 6 INCH CAST IRON AND 235 FEET OF 8
INCH CAST IRON ALONG CORNELIA LANE AND ALEXANDER DRIVE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 94 of 178
313
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
2984 080.69208 73,112
INSTALL 2030 FEET OF 4 INCH POLY AND ABANDON 1305 FEET IF 4 INCH CAST
IRON, 385 FEET OF 4 INCH STEEL ALONG REED LN IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2985 080.69209 77,820
INSTALL 1660 FEET OF 2 INCH POLY AND 450 FEET OF 4 INCH POLY AND ABANDON
1125 FEET OF 4 INCH CAST IRON, 610 FEET OF 6 INCH CAST IRON AND 355 FEET OF
8 INCH CAST IRON ALONG EDGEFIELD AVENUE AND S POLK STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2986 080.69212 22,207
RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH POLY, 100 FEET OF 4 INCH
POLY AND AND ABANDON 50 FEET OF 6 INCH AND 100 FEET OF 4 INCH STEEL
ALONG WHITE SETTLEMENT ROAD TO ACCOMMODATE THE CITY OF FORT WORTH
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
2987 080.69213 6,165
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION ALONG PINE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
2988 080.69220 3,305
INSTALL DISTRICT REGULATOR STATION IN ABILENE AND ABANDON DISTRICT
REGULATOR STATION DRS025 IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
2989 080.69221 1,950,023
RELOCATE FACILITIES. INSTALL 3,226 FEET OF 6 INCH AND 2,251 FEET OF 8 INCH
POLY, 170 FEET OF 10 INCH AND 160 FEET OF 12 INCH STEEL AND ABANDON 2,151
FEET OF 8 INCH, 3,116 FEET OF 4 INCH POLY DUE TO TXDOT ROAD AND DRAINAGE
IMPROVEMENTS PROJECT IN ROCKWALL COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY DECEMBER
2990 080.69222 1,329
RELOCATE FACILITIES. INSTALL 60 FEET OF 6 INCH POLY ALONG COOK LANE AND
ABANDON 35 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF PROSPER IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PROSPER
RELOCATION OF
FACILITIES OCTOBER
2991 080.69224 12,476
REPLACE DISTRICT REGULATOR STATION #46 IN WACO AND ABANDON EXISTING
DRS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
2992 080.69226 70,570
INSTALL 2265 FEET OF 4 INCH POLY ALONG ATLANTA STREET AND ABANDON 1600
FEET OF 4 INCH CAST IRON, 575 FEET OF 6 INCH CAST IRON AND 25 FEET OF 6
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
2993 080.69227 58,206
INSTALL 1290 FEET OF 2 INCH POLY AND ABANDON 1290 FEET OF 4 INCH CAST
IRON ALONG WHITWORTH STREET IN ACCORDANCE WITH RAILROAD COMMISION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
2994 080.69237 966
INSTALL 1572 FEET OF 4 INCH POLY AND 13998 FEET OF 2 INCH POLY ALONG
CHARTWELL CREST. RESIDENTIAL FARMERS BRANCH GROWTH SEPTEMBER
2995 080.69241 27,429
RELOCATE FACILITIES. INSTALL 1400 FEET OF 2 INCH POLY ALONG MADRID DRIVE
AND ABANDON 1552 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
DUNCANVILLE IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE
RELOCATION OF
FACILITIES OCTOBER
2996 080.69248 7,992
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION, 95 FEET OF 4 INCH STEEL AND INSTALL 5 FEET OF 2 INCH, 95 FEET OF 4
INCH POLY ALONG LEON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY OCTOBER
2997 080.69262 828
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION ALONG TRINITY BLVD AND POST OAK BLVD IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY OCTOBER
2998 080.69274 33,485
INSTALL 1875 FEET OF 4 INCH POLY AND ABANDON 1450 FEET OF 4 INCH CAST
IRON ALONG WEST PAFFORD STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
2999 080.69275 60,220
INSTALL 1580 FEET OF 4 INCH POLY AND ABANDON 986 FEET OF 4 INCH CAST
IRON, 424 FEET OF 6 INCH POLY ALONG DEEN AVENUE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3000 080.69277 16,274
INSTALL 1482 FEET OF 4 INCH POLY, AND ABANDON 859 FEET OF 4 INCH CAST
IRON, 533 FT OF 4 INCH POLY ALONG REFUGIO AVENUE IN ACCORDANCE WITH
RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3001 080.69294 530
ABANDON DISTRICT REGULATOR STATION 233 IN FORT WORTH ALONG 29TH
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3002 080.69302 41,937
INSTALL 2265 FEET OF 2 INCH POLY MARYLAND AVENUE AND ABANDON 2065 FEET
OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3003 080.69303 60,767
INSTALL 2140 FEET OF 2 INCH AND 365 FEET OF 4 INCH POLY AND ABANDON 1590
FEET OF 6 INCH CAST IRON AND 765 FEET OF 6 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3004 080.69304 65,227
INSTALL 3060 FEET OF 2 INCH POLY AND ABANDON 1895 FEET OF 4 INCH CAST
IRON, 285 FEET OF 4 INCH POLY AND 440 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3005 080.69312 24,931
RELOCATE FACILITIES. INSTALL 1300 FEET OF 4 INCH POLY AND 150 FEET OF 6
INCH STEEL ALONG SPRING VALLEY ROAD/ FM 2113 AND ABANDON 270 FEET OF 3
INCH POLY TO ACCOMMODATE CITY OF HEWITT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEWITT
RELOCATION OF
FACILITIES OCTOBER
3006 080.69313 33,787
RELOCATE FACILITIES. 2617 FEET OF 2 INCH POLY ALONG GRANDVIEW AND
ABANDON 2266 FEET OF 2 INCH AND 351 FEET OF 4 INCH STEEL TO
ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3007 080.69315 111,195
INSTALL 180 FEET OF 12 INCH, 2060 FEET OF 8 INCH, 1100 FEET OF 6 INCH AN 285
FEET OF 2 INCH POLY AND ABANDON 2180 FEET OF 16 INCH STEEL, 50 FEET OF 8
INCH POLY, 150 FEET OF 6 INCH STEEL AND 150 FEET OF 2 INCH STEEL IN
ACCORDANE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3008 080.69316 8,581
INSTALL 550 FEET OF 2 INCH POLY ALONG ROUNDROCK TRAIL AND ABANDON 550
FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY OCTOBER
3009 080.69317 817
INSTALL 405 FEET OF 6 INCH AND 250 FEET OF 2 INCH POLY ALONG MONTGOMERY
BOULEVARD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ALLEN GROWTH MARCH
3010 080.69321 11,752
INSTALL 2555 FEET OF 2 INCH POLY ALONG THE STREETS OF HOMESTEAD
SUBDIVISION IN SUNNYVALE TX. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SUNNYVALE GROWTH NOVEMBER
3011 080.69323 42,158
INSTALL 1800 FEET OF 2 INCH POLY AND ABANDON 1565 FEET OF 4 INCH, 485 FEET
OF 6 INCH CAST IRON, 170 FEET OF 2 INCH AND 20 FEET OF 4 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3012 080.69331 7,770
INSTALL 5 FEET OF 2 INCH STEEL ALONG CR 186 AND ABANDON 5 FEET OF 2 INCH
STEEL IN ACCRODANCE WITH THE RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS COOLIDGE SYSTEM INTEGRITY OCTOBER
3013 080.69333 11,856
INSTALL 2,592 FEET OF 2 INCH AND 2,366 FEET OF 4 INCH POLY ALONG LEAF
DRIVE. RESIDENTIAL NOLANVILLE GROWTH DECEMBER
3014 080.69341 24,067
RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH AND 990 FEET OF 4 INCH
POLY ALONG BUSINESS 78 AND ABANDON 63 FEET OF 1.25 INCH, 45 FEET OF 2
INCH STEEL, 930 FEET OF 4 INCH STEEL AND 27 FEET OF 4 INCH POLY TO
ACCOMMODATE FARMERSVILLE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE
RELOCATION OF
FACILITIES OCTOBER
3015 080.69344 38,566
RELOCATE FACILITIES. 2510 FEET OF 2 INCH POLY ALONG DESSERT RIDGE DRIVE
AND ABANDON 416 FEET OF 2 INCH, 2079 FEET OF 3 INCH AND 15 FEET OF 6 INCH
STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3016 080.69349 9,612
RELOCATE FACILITIES. INSTALL 20 FEET OF 6 INCH POLY ALONG GARAPAN DR
AND ABANDON 20 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
3017 080.69373 30,899
INSTALL DRS 423 AND ABANDON DRS 423 ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3018 080.69375 35,535
INSTALL 1600 FEET OF 6 INCH POLY ALONG OLD ANSON ROAD AND HWY 277 AND
ABANDON 792 FEET OF 4 INCH STEEL AND 791 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 95 of 178
314
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3019 080.69378 5,902 INSTALL 25 FEET OF 2 INCH POLY ALONG GREENBRIAR ROAD.
COMMERCIAL OR
INDUSTRIAL WICHITA FALLS GROWTH JUNE
3020 080.69414 30,018
RELOCATE FACILITIES. INSTALL 110 FEET OF 4 INCH POLY AND ABANDON 105
FEET OF 4 INCH POLY ALONG GALLOWAY AVENUE TO ACCOMMODATE STORM
DRAIN TXDOT PROJECT. ALL CUSTOMERS MESQUITE
RELOCATION OF
FACILITIES DECEMBER
3021 080.69417 10,369
RELOCATE FACILITIES. INSTALL 320 FEET OF 6 INCH, 30 FEET OF 4 INCH AND 30
FEET OF 2 INCH POLY ALONG W MORPHY STREET AND ABANDON 320 FEET OF 6
INCH, 25 FEET OF 4 INCH AND 25 FEET OF 2 INCH STEEL 5 FEET OF 4 INCH AND 5
FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3022 080.69420 11,798
RELOCATE FACILITIES. INSTALL 630 FEET OF 4 INCH AND 150 FEET OF 2 INCH
POLY ALONG DENVER AVENUE AND ABANDON 780 FEET OF 3 INCH STEEL TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3023 080.69426 8,096
RELOCATE FACILITIES. INSTALL 540 FEET OF 4 INCH POLY ALONG FOSTER AND
ABANDON 520 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF COLLEGE
STATION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS COLLEGE STATION
RELOCATION OF
FACILITIES OCTOBER
3024 080.69430 37,889
INSTALL 2000 FEET OF 4 INCH POLY ALONG AVENUE L IN FORT WORTH AND
ABANDON 1700 FEET OF 4 INCH CAST IRON, 300 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3025 080.69432 8,957
INSTALL 596 FEET OF 4 INCH POLY AND ABANDON 596 FEET OF 4 INCH POLY
ALONG COOPER MOUNTAIN DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
3026 080.69433 24,025
INSTALL 675 FEET OF 4 INCH POLY, AND ABANDON 670 FEET OF 4 INCH STEEL, 58
FEET OF 4 INCH POLY ALONG HUTHCINSON STREET AND HALE AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3027 080.69434 38,910
INSTALL 1700 FEET OF 4 INCH POLY ALONG AVENUE M IN FORT WORTH TX AND
ABANDON 1300 FEET OF 4 INCH CAST IRON, 400 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3028 080.69435 25,074
INSTALL 1300 FEET OF 2 INCH POLY ALONG CHERRYWOOD AVENUE AND
ABANDON 920 FEET OF 4 INCH CAST IRON, 345 FEET OF 8 INCH CAST IRON, 10
FEET OF 4 INCH POLY AND 25 FEET OF 8 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3029 080.69436 84,980
INSTALL 1690 FEET OF 2 INCH AND 760 FEET OF 4 INCH POLY AND ABANDON 1545
FEET OF 4 INCH AND 760 FEET OF 6 INCH CAST IRON ALONG IILINOIS AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3030 080.69437 34,869
INSTALL 1300 FEET OF 2 INCH POLY AND ABANDON 1160 FEET OF 4 INCH AND 780
FEET OF 6 INCH CAST IRON ALONG 7TH STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3031 080.69438 58,643
INSTALL 1015 FEET OF 2 INCH POLY AND 650 FEET OF 4 INCH POLY AND ABANDON
1535 FEET OF 4 INCH CAST IRON AND 100 FEET OF 4 INCH POLY ALONG TRAVIS
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3032 080.69439 3,224
INSTALL 385 FEET OF 2 INCH POLY ALONG LOUIS J. RODRQUEZ AND ABANDON 385
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3033 080.69440 35,507
INSTALL 720 FEET OF 4 INCH POLY AND ABANDON 755 FEET OF 4 INCH CAST IRON,
650 FEET OF 8 INCH CAST IRON, 45 FEET OF 2 INCH POLY AND 215 FEET OF 2 INCH
STEEL ALONG BUENA VISTA STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3034 080.69441 85,116
INSTALL 1405 FEET OF 2 INCH POLY, 860 FEET OF 4 INCH POLY ALONG VANDELIA
STREET AND ABANDON 1120 FEET OF 4 INCH CAST IRON, 2190 FEET OF 6 INCH
CAST IRON, 835 FEET OF 8 INCH CAST IRON, 55 FEET OF 6 INCH POLY, 780 FEET OF
4 INCH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3035 080.69447 8,400
INSTALL 325 FEET OF 4 INCH POLY AND ABANDON 465 FEET OF 6 INCH POLY, 74
FEET OF 6 INCH STEEL, 41 FEET OF 8 INCH STEEL ALONG ROSS AVENUE AND
CLINT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3036 080.69451 259,356
INSTALL 4,150 FEET OF 2 INCH POLY ALONG THE STREETS OF ANNA CROSSING
VILLAS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ANNA GROWTH JUNE
3037 080.69469 2,023
INSTALL 2860 FEET OF 4 INCH POLY TO SERVE THE MCKINNEY AIRPORT CENTER
IN MCKINNEY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MCKINNEY GROWTH MARCH
3038 080.69470 46,750
INSTALL 1755 FEET OF 2 INCH POLY AND ABANDON 2040 FEET OF 4 INCH AND 445
FEET OF 6 INCH CAST IRON ALONG VICKERY BOULEVARD IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3039 080.69484 5,401
RELOCATE FACILITIES. INSTALL 470 FEET OF 4 INCH POLY AND ABANDON 460
FEET OF 4 INCH POLY ALONG SEETON ROAD TO ACCOMMODATE CITY OF GRAND
PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES OCTOBER
3040 080.69491 9,420
RELOCATE FACILITIES. INSTALL 350 FEET OF 6 INCH POLY ALONG FM 2181 AND
ABANDON 300 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF DENTON IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
3041 080.69504 18,012
RELOCATE FACILITIES. INSTALL 120 FEET OF 6 INCH POLY AND ABANDON 120
FEET OF 6 INCH POLY ALONG PENNSYLVANIA AVENUE TO ACCOMMODATE THE
CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3042 080.69519 10,958
RELOCATE FACILITES. INSTALL 2 POLY SERVICE LINES AND ABANDON 2 POLY
SERVICE LINES ALONG PLEASANT RUN ROAD TO ACCOMMODATE THE CITY OF
COLLEYVILLE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
RELOCATION OF
FACILITIES OCTOBER
3043 080.69561 10,680
RELOCATE FACILITIES. INSTALL 180 FEET OF 6 INCH AND 450 FEET OF 2 INCH
POLY ALONG WEST VICKERY BOULEVARD AND ABANDON 400 FEET OF 4 INCH
POLY AND 50 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3044 080.69562 157
RELOCATE FACILITIES. ABANDON 147 FEET OF 6 INCH POLY ALONG PIETRA LANE
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3045 080.69563 2,940
ABANDON DRS08 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY OCTOBER
3046 080.69569 46,088
INSTALL 1875 FEET OF 4 POLY AND RETIRE 1950 FEET OF 4 INCH CAST IRON, 365
FEET OF 4 INCH POLY ALONG W. DREW STREET IN FORT WORTH TX IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3047 080.69584 8,445
INSTALL DISTRICT REGULATOR STATION 40 ALONG THE STREETS OF N 33RD
STREET AND N 34TH STREET IN WACO AND ABANDON DISTRICT REGULATOR
STATION 40 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
3048 080.69592 2,996
INSTALL DISTRICT REGULATOR STATION 023 IN ABILENE AND ABANDON DISTRICT
REGULATOR STATION 023 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
3049 080.69598 11,495
ABANDON DISTRICT REGULATOR STATION #069 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3050 080.69599 10,927
INSTALL DISTRICT REGULATOR STATION 49 ALONG THE STREETS OF N 42ND
STREET AND SANGER STREET IN WACO AND ABANDON DISTRICT REGULATOR
STATION 49 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209 ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
3051 080.69608 1,586
INSTALL 1163 FEET OF 6 INCH, 2114 FEET OF 4 INCH, AND 2851 FEET OF 2 INCH
POLY ALONG THE STREETS OF SHADOWGLEN DEVELOPMENT. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL MANOR GROWTH JUNE
3052 080.69622 347
INSTALL 5000 FEET OF 2 INCH AND 250 FEET OF 6 INCH POLY ALONG STAG LEAP
LANE. RESIDENTIAL ARLINGTON GROWTH MARCH
3053 080.69629 2,458
RELOCATE FACILITIES. INSTALL 314 FEET OF 6 INCH POLY AND ABANDON 294
FEET OF 6 INCH POLY ALONG CUSTER ROAD. ALL CUSTOMERS RICHARDSON
RELOCATION OF
FACILITIES DECEMBER
MTX Additions
Page 96 of 178
315
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3054 080.69631 3,395
RELOCATE FACILITIES. INSTALL 702 FEET OF 4 INCH POLY AND ABANDON 272
FEET OF 4 INCH POLY ALONG COIT ROAD. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
3055 080.69647 956
INSTALL 3984 FEET OF 8 INCH POLY ALONG COUNTY ROAD 176. DEVELOPER
INSTALLED FACILITIES. ALL CUSTOMERS ROUND ROCK GROWTH MARCH
3056 080.69666 32,575
RELOCATE FACILITIES. INSTALL 2143 FEET OF 2 INCH POLY ALONG WEST 4TH AND
ABANDON 1200 FEET OF 2 INCH BARE STEEL AND 400 FEET OF 2 INCH COATED
STEEL AND 543 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF
CORSICANA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
RELOCATION OF
FACILITIES OCTOBER
3057 080.69673 17,598
RELOCATE FACILITIES. INSTALL 1550 FEET OF 2 INCH AND 80 FEET OF 4 INCH
POLY ALONG NORTH FREY AND EAST COLLINS AND ABANDON 1550 FEET OF 2
INCH AND 80 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF CORSICANA
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
RELOCATION OF
FACILITIES OCTOBER
3058 080.69675 16,954
INSTALL LEAK REPAIRS IN THE BOYD AREA IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD SYSTEM INTEGRITY OCTOBER
3059 080.69676 10,412
INSTALL 575 FEET OF 4 INCH AND 2167 FEET OF 2 INCH POLY ALONG THE STREETS
OF KASPER SECTION 10. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
3060 080.69687 22,011
RELOCATE FACILITIES. INSTALL 2100 FEET OF 2 INCH POLY ALONG FONTANA
AVENUE AND ABANDON 2100 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY
OF RICHARDSON IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
RELOCATION OF
FACILITIES OCTOBER
3061 080.69695 704
ABANDON DISTRICT REGULATOR STATION 036 IN DALLAS IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3062 080.69697 32,056
RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH AND 900 FEET OF 4 INCH
POLY ALONG MARSHALL DRIVE AND BRENT COURT AND ABANDON 1700 FEET OF 4
INCH STEEL TO ACCOMMODATE THE CITY OF GRAND PRAIRIE IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES OCTOBER
3063 080.69706 535
ABANDON DISTRICT REGULATOR STATION #017 IN DALLAS, DALLAS COUNTY AS
PART OF THE AREA REPLACEMENT PROJECT AR ID#2835.1 IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3064 080.69707 11,384
RELOCATE FACILITIES. INSTALL 785 FEET OF 2 INCH POLY AND ABANDON 395
FEET OF 3 INCH AND 390 FEET OF 4 INCH STEEL ALONG MEEK STREET TO
ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
3065 080.69716 6,095
RELOCATE FACILITIES. INSTALL 90 FEET OF 6 INCH POLY ALONG WESTPORT
PARKWAY AND ABANDON 80 FEET OF 6 INCH POLY TO ACCOMODATE CITY OF
FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3066 080.69719 74,107
RELOCATE FACILITIES. INSTALL 400 FEET OF 6 INCH POLY 4900 FEET OF 4 INCH
POLY ALONG STONEWALL STREET AND ABANDON 175 FEET OF 6 INCH, 1680 FEET
OF 4 INCH STEEL,50 FEET OF 4 INCH POLY, 2865 FEET OF 3 INCH STEEL TO
ACCOMMODATE CITY OF GREENVILLE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE
RELOCATION OF
FACILITIES OCTOBER
3067 080.69720 4,922
REPLACE GROUND BED ON C16-3 SYSTEM IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY OCTOBER
3068 080.69728 5,760
INSTALL 585 FEET OF 4 INCH POLY ALONG W AVE L AND ABANDON 6 FEET OF 6
INCH POLY AND 75 FEET OF 3 INCH STEEL AND 485 FEET OF 6 INCH CAST IRON IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER
3069 080.69740 18,471
RELOCATE FACILITIES. INSTALL 700 FEET OF 12 INCH POLY ALONG AVENUE G AND
ABANDON 700 FEET OF 12 INCH STEEL TO ACCOMMODATE THE CITY OF FORT
WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3070 080.69746 9,321
INSTALL 1057 FEET OF 4 INCH POLY ALONG EAST DIETERT AND ABANDON 1146
FEET OF 4 INCH STEEL IN ACCORDANCE&NBSP; WITH RAILROAD COMMISION OF
TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER
3071 080.69753 65,979
INSTALL 3712 FEET OF 2 INCH, 2841 FEET OF 4 INCH AND 2692 FEET OF 6 INCH
POLY ALONG STREETS OF COTTONWOOD CREEK PHASE 1. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH JANUARY
3072 080.69755 5,685
RELOCATE FACILITIES. INSTALL 390 FEET OF 2 INCH POLY ALONG HWY 679 S OF
LEXINGTON AND ABANDON 1112 FEET OF 4 INCH AND 2 FEET OF 2 INCH POLY 15
FEET OF 2 INCH AND 412 FEET OF 3 INCH STEEL AND 190 FEET OF 3 INCH POLY TO
ACCOMMODATE THE CITY OF GORMAN IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORMAN SYSTEM INTEGRITY OCTOBER
3073 080.69757 6,907
INSTALL REGULATOR STATION IN IRVING AND ABANDON REGULATOR STATION
MLR 10 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER
3074 080.69760 50,170
RELOCATE FACILITIES. INSTALL 70 FEET OF 2 INCH POLY ALONG MARYS CREEK
DRIVE AND 2300 FEET OF 16 INCH STEEL AND ABANDON 932 FEET OF 2 INCH
STEEL AND 2216 FEET OF 16 INCH STEEL TO ACCOMMODATE THE CITY OF FORT
WORTH SEWER IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES DECEMBER
3075 080.69761 21,616
INSTALL 145 FEET OF 4 INCH POLY, 50 FEET OF 2 INCH POLY AND ABANDON
DISTRICT REGULATOR STATION 03 AND 05 ALONG N. TAYLOR STREET AND
ABANDON 70 FEET OF 3 INCH STEEL, 125 FEET OF 2 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LADONIA SYSTEM INTEGRITY OCTOBER
3076 080.69779 8,649
RELOCATE FACILITIES. REPLACE 5 SERVICE LINES ALONG HANDLEY DRIVE TO
ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3077 080.69783 66,806
INSTALL 1815 FEET OF 2 INCH POLY AND ABANDON 435 FEET OF 4 INCH CAST IRON
AND 1380 FEET OF 6 INCH CAST IRON ALONG LATIMER STREET IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3078 080.69785 1,632
RELOCATE FACILITIES. INSTALL 50 FEET OF 4 INCH POLY AND ABANDON 30 FEET
OF 3 INCH POLY ALONG PECAN PARK DRIVE TO ACCOMMODATE CITY OF
ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
3079 080.69790 5,508
INSTALL 620 FEET OF 2 INCH POLY ALONG FRANCISCO LEMOS STREET AND
ABANDON 584 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER
3080 080.69793 16,613
RELOCATE FACILITIES. REPLACE 50 SERVICE LINES ALONG ELLIS ROAD TO
ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3081 080.69803 7,763
RELOCATE FACILITIES. INSTALL 370 FEET OF 4 INCH POLY AND ABANDON 348
FEET OF 3 INCH STEEL ALONG WEBSTER AND 4TH TO ACCOMMODATE THE CITY
OF GLEN ROSE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GLEN ROSE
RELOCATION OF
FACILITIES OCTOBER
3082 080.69813 705
RELOCATE FACILITIES. INSTALL 120 FEET OF 3 INCH STEEL AND ABANDON 120
FEET OF 3 INCH STEEL ALONG LINE W4 IN DENTON COUNTY TO ACCOMODATE
STORM SEWER PROJECT. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES MARCH
3083 080.69845 16,597
RELOCATE FACILITIES. INSTALL 960 FEET OF 6 INCH POLY ALONG HILLCREST AND
CRESTLINE ROAD AND ABANDON 946 FEET OF 6 INCH STEEL TO ACCOMODATE
THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3084 080.69850 775
INSTALL 5410 FEET OF 2 INCH AND 2120 FEET OF 6 INCH POLY ALONG STREETS OF
THE WINCHESTER SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PRINCETON GROWTH MARCH
3085 080.69863 21,814
INSTALL 782 FEET OF 2 INCH POLY ALONG CRESTVIEW IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARBLE FALLS SYSTEM INTEGRITY OCTOBER
3086 080.69873 1,352
INSTALL 225 FEET OF 2 INCH POLY AND ABANDON 154 FEET OF 3 INCH CAST IRON
ALONG PINE AND CARDINAL STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ECTOR SYSTEM INTEGRITY OCTOBER
3087 080.69887 454 INSTALL 3400 FEET OF 8 INCH POLY ALONG FM 2331. ALL CUSTOMERS GODLEY GROWTH APRIL
MTX Additions
Page 97 of 178
316
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3088 080.69896 3,661
RELOCATE FACILITIES. INSTALL 330 FEET OF 2 INCH POLY AND ABANDON 325
FEET OF 2 INCH STEEL ALONG E. GANTT STREET TO ACCOMMODATE THE CITY OF
PRINCETON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS PRINCETON
RELOCATION OF
FACILITIES OCTOBER
3089 080.69904 7,154
RELOCATE FACILITIES. INSTALL 525 FEET OF 4 INCH POLY ALONG FM 8 AND
ABANDON 340 FEET OF 4 INCH, 139 FEET OF 3 INCH POLY TO ACCOMMODATE THE
CITY OF STEPHENVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS STEPHENVILLE
RELOCATION OF
FACILITIES OCTOBER
3090 080.69907 3,117
RELOCATE FACILITIES. INSTALL 230 FEET OF 4 INCH POLY AND ABANDON 206
FEET OF 4 INCH STEEL ALONG W 17TH STREET TO ACCOMMODATE CITY OF
BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES OCTOBER
3091 080.69912 9,598
INSTALL 360 FEET OF 2 INCH, ALONG 5TH AVE AT PECAN AND ABANDON 240 FEET
OF 3 INCH STEEL AND 106 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY OCTOBER
3092 080.69922 1,175 INSTALL 100 FEET OF 2 INCH POLY ALONG JO PIERCE STREET. RESIDENTIAL DALLAS GROWTH JULY
3093 080.69925 1,987
INSTALL 5,908 FEET OF 6 INCH, 3,379 FEET OF 4 INCH AND 3,721 FEET OF 2 INCH
POLY ALONG THE STREETS OF WILDCAT RIDGE PHASE 2. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL GODLEY GROWTH MARCH
3094 080.69932 (36,300)
INSTALL 799 FEET OF 4 INCH AND 183 FEET OF 2 INCH POLY AND ABANDON 740
FEET OF 3 INCH AND 228 FEET OF 2 INCH POLY ALONG PLANO PARKWAY. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES SEPTEMBER
3095 080.69934 5,994
RELOCATE FACILITIES. INSTALL 349 FEET OF 4 INCH POLY AND ABANDON 334
FEET OF 4 INCH POLY ALONG CITY LINE TO ACCOMMODATE DART SILVER LINE
RAIL PROJECT. ALL CUSTOMERS RICHARDSON
RELOCATION OF
FACILITIES DECEMBER
3096 080.69940 2,979
RELOCATE FACILITIES. INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 255
FEET OF 2 INCH STEEL ALONG COUNTRY CLUB ROAD TO ACCOMMODATE CITY OF
ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
RELOCATION OF
FACILITIES OCTOBER
3097 080.69956 3,928
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY AND ABANDON 100
FEET OF 2 INCH STEEL ALONG HERVIE STREET TO ACCOMMODATE THE CITY OF
FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3098 080.69957 9,486
RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG LOCKE AVENUE
AND ABANDON 900 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF FORT
WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3099 080.69958 41,708
RELOCATE FACILITIES. INSTALL 1940 FEET OF 4 INCH POLY ALONG VOLDER
AVENUE AND ABANDON 1940 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY
OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3100 080.69962 7,995
RELOCATE FACILITIES. INSTALL 62 FEET OF 4 INCH POLY AND ABANDON 40 FEET
OF 4 INCH POLY ALONG WINDY RYON WAY AND HIGHWAY 287 TO ACCOMODATE
THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3101 080.69967 4,488
INSTALL DISTRICT REGULATOR STATION 24 ALONG THE STREETS OF MAIN STREET
AND BOOTH STREET AND DISTRICT REGULATOR STATION 28 ALONG THE STREETS
OF SYMES STREET AND GANO STREET AND ABANDON DISTRICT REGULATOR
STATION 16 ALONG W MARTIN LUTHER KING JR BLVD AND STURGIS STREET IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR SYSTEM INTEGRITY OCTOBER
3102 080.69978 8,926
INSTALL 600 FEET OF 2 INCH POLY ALONG SAUNDERS (FM 814) AND ABANDON 505
FEET OF 3 INCH AND 286 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY OCTOBER
3103 080.69981 10,714
RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH POLY ALONG WJ BOAZ AND
ABANDON 300 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF FORT
WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3104 080.69999 340
INSTALL 3,480 FEET OF 2 INCH, 1,350 FEET OF 4 INCH AND 2,080 FEET OF 6 INCH
POLY ALONG THE STREETS OF TRADITION PHASE 1A. RESIDENTIAL FORT WORTH GROWTH JUNE
3105 080.70009 4,415
ABANDON DISTRICT REGULATOR STATION #263 ALONG THE STREETS OF S
LLEWELLYN AND W PAGE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3106 080.70046 287,224
RELOCATE FACILITIES. INSTALL 1300 FEET OF 2 INCH POLY ALONG RYANRIDGE
STREET AND ABANDON 1300 FEET OF 2 INCH STEEL TO ACCOMODATE THE CITY
OF DALLAS STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JUNE
3107 080.70066 8,642
INSTALL 1 GROUND BED, RECTIFIER AND TEST STATION ALONG LINE L14 IN BELL
COUNTY AND ABANDON 1 GROUND BED, RECTIFIER AND TEST STATION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY OCTOBER
3108 080.70083 31,164
INSTALL 1778 FEET OF 8 INCH POLY, 2818 FEET OF 4 INCH AND 5633 FEET OF 2
INCH POLY ALONG THE STREETS OF PARKSIDE ON THE RIVER PHASE 1A.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH MARCH
3109 080.70094 18,803
RELOCATE FACILITIES. INSTALL 850 FEET OF 2 INCH POLY ALONG RED BUD LANE
AND ABANDON 850 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF FORT
WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3110 080.70099 3,381
INSTALL DISTRICT REGULATOR STATION IN TEMPLE AND ABANDON DISTRICT
REGULATOR STATION 23 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER
3111 080.70104 54,948
RELOCATE FACILITIES. INSTALL 3500 FEET OF 4 INCH AND 300 FEET OF 2 INCH
POLY ALONG NW 7TH STREET AND ABANDON 2700 FEET OF 4 INCH AND 450 FEET
OF 6 INCH STEEL AND 230 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF
GRAND PRAIRIE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES OCTOBER
3112 080.70106 807
INSTALL 10,930 FEET OF 2 INCH AND 1200 FEET OF 12 INCH POLY ALONG THE
STREETS OF THE THIRD PHASE OF THE WINCHESTER. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL PRINCETON GROWTH MARCH
3113 080.70121 1,619
INSTALL 270 FEET OF 2 INCH POLY ALONG SOUTH ASH AND ABANDON 270 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ARCHER CITY SYSTEM INTEGRITY OCTOBER
3114 080.70123 12,800
INSTALL 2,907 FEET OF 6 INCH POLY ALONG THE STREETS OF SANTA RITA
FLOWER VALLEY SUBDIVISION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LIBERTY HILL GROWTH JULY
3115 080.70124 331
INSTALL 1 DISTRICT REGULATOR STATION IN FORT WORTH AND ABANDON
DISTRICT REGULATOR STATION 522 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3116 080.70126 10,064
INSTALL 1712 FEET OF 8 INCH, 1165 FEET OF 6 INCH, 292 FEET OF 4 INCH AND 786
FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH JULY
3117 080.70128 13,561
INSTALL 337 FEET OF 6 INCH AND 478 FEET OF 2 INCH POLY ALONG THE STREETS
OF SANTA RITA RANCH NORTH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH JUNE
3118 080.70137 4,936
RELOCATE FACILITIES: REPLACE METER INSTALLATIONS AND METER EQUIPMENT
DUE TO RELOCATION OF RK HALL ASPHALT PLANT. ALL CUSTOMERS GREENVILLE
RELOCATION OF
FACILITIES APRIL
3119 080.70139 326
INSTALL DISTRICT REGULATOR STATION IN FORT WORTH AND ABANDON DISTRICT
REGULATOR STATION #517 IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3120 080.70141 11,482
INSTALL 1633 FEET OF 4 INCH AND 3406 FEET OF 2 INCH POLY ALONG THE
STREETS OF SANTA RITA RANCH NORTH SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH JULY
3121 080.70142 3,395
ABANDON DISTRICT REGULATOR STATION #127 ALONG THE STREETS OF W 6TH
STREET AND WOODLAWN AVENUE IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3122 080.70144 548
ABANDON 1325 FEET OF 2 INCH STEEL AND 793 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KIRKLAND SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 98 of 178
317
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3123 080.70149 15,208
INSTALL 1272 FEET OF 4 INCH POLY AND ABANDON 329 FEET OF 8 INCH, 17 FEET
OF 4 INCH AND 91 FEET OF 2 INCH STEEL 440 FEET OF 3 INCH AND 219 FEET OF 2
INCH POLY ALONG CHESTNUT AND CRAWFORD IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER
3124 080.70155 1,475
ABANDON DISTRICT REGULATOR STATION #09 ALONG PENELOPE IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY OCTOBER
3125 080.70158 2,436
RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG 509 COULTER
DRIVE AND ABANDON 100 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF
BRYAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES OCTOBER
3126 080.70161 83,890
RELOCATE FACILITIES. INSTALL 251 FEET OF 2 INCH POLY AND ABANDON 243
FEET OF 2 INCH STEEL TO ACCOMMODATE DART RAIL PROJECT. ALL CUSTOMERS ADDISON
RELOCATION OF
FACILITIES OCTOBER
3127 080.70162 4,512
RELOCATE FACILITIES. INSTALL 482 FEET IF 4 INCH POLY AND ABANDON 296 FEET
OF 4 INCH POLY ALONG INDUSTRIAL TO ACCOMMODATE DART SILVE LINE RAIL
PROJECT. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES DECEMBER
3128 080.70166 1,460
ABANDON DISTRICT REGULATOR STATION 153 ALONG THE STREETS OF MARSALIS
AVENUE AND HOBSON AVENUE IN DALLAS IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3129 080.70169 18,287
INSTALL 880 FEET OF 2 INCH POLY AND ABANDON 1780 FEET OF 1.25 INCH POLY
ALONG CLOTELL DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3130 080.70173 1,294
ABANDON DISTRICT REGULATOR STATION 152 ALONG THE STREETS OF BECKLEY
AVENUE AND HOBSON AVENUE IN DALLAS IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3131 080.70176 9,802
INSTALL 1100 FEET OF 4 INCH POLY ALONG INDUSTRIAL BOULEVARD. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL ROCKWALL GROWTH JUNE
3132 080.70189 276,885
INSTALL 5973 FEET OF 12 INCH AND 3510 FEET OF 8 INCH POLY ALONG FM 3040
AND ABANDON 1570 FEET OF 6 INCH POLY, 510 FEET OF 4 INCH, 455 FEET OF 2
INCH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY OCTOBER
3133 080.70193 1,366,620
REPLACE AMLD MAINS 5 TO 250 IN THE NORTH EAST REGION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
3134 080.70194 4,225,344
REPLACE AMLD MAINS 5 TO 250 IN THE NORTH CENTRAL REGION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER
3135 080.70195 3,162,396
REPLACE AMLD MAINS 5 TO 250 IN THE NORTH WEST REGION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD SYSTEM INTEGRITY DECEMBER
3136 080.70196 5,531,349
REPLACE AMLD MAINS 5 TO 250 IN THE SOUTH DALLAS REGION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
3137 080.70197 2,656,660
REPLACE AMLD MAINS 5 TO 250 IN THE SOUTH EAST REGION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
3138 080.70198 304,258
REPLACE AMLD MAINS 5 TO 250 IN THE SOUTH WEST REGION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY DECEMBER
3139 080.70199 366,167
REPLACE AMLD MAINS 5 TO 250 IN THE WEST FORT WORTH REGION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
3140 080.70200 1,306,886
REPLACE AMLD MAINS 5 TO 250 IN THE WEST ARLINGTON IRVING REGION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
3141 080.70201 21,763,165
REPLACE AMLD MAINS 5 TO 250 IN THE WEST WEST REGION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
3142 080.70202 2,666,062
REPLACE AMLD SERVICE LINES IN THE NORTH EAST REGION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY DECEMBER
3143 080.70203 3,929,035
REPLACE SERVICE LINES IN WICHITA FALLS IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
3144 080.70204 5,545,613
REPLACE SERVICE LINES IN DALLAS IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
3145 080.70205 3,725,165
REPLACE SERVICE LINES IN MCKINNEY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER
3146 080.70206 3,159,102
REPLACE SERVICE LINES IN WACO IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
3147 080.70207 317,300
REPLACE SERVICE LINES IN FORT WORTH IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
3148 080.70208 1,890,367
REPLACE SERVICE LINES IN ARLINGTON IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
3149 080.70209 242,243
REPLACE SERVICE LINES IN ROUND ROCK IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY DECEMBER
3150 080.70210 9,376,752
REPLACE SERVICE LINES IN ABILENE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
3151 080.70211 2,001,905
REPLACE MAIN 5-250' IN THE NORTH EAST REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY DECEMBER
3152 080.70212 4,830,334
REPLACE MAIN 5-250' IN THE NORTH CENTRAL REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER
3153 080.70213 10,766,527
REPLACE MAIN 5-250' IN THE NORTH WEST REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD SYSTEM INTEGRITY DECEMBER
3154 080.70214 7,939,148
REPLACE MAIN 5-250' IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
3155 080.70215 4,444,407
REPLACE MAIN 5-250' IN THE SOUTH EAST REGION DUE TO HIGH RISK
DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
3156 080.70216 1,950,723
REPLACE MAIN 5-250' IN THE SOUTH WEST REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY DECEMBER
3157 080.70217 3,502,292
REPLACE MAIN 5-250' IN THE WEST FORT WORTH REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
3158 080.70218 1,636,588
REPLACE MAIN 5-250' IN THE WEST ARLINGTON IRVING REGION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
3159 080.70219 6,023,679
REPLACE MAIN 5-250' IN THE WEST WEST REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY DECEMBER
3160 080.70220 4,617,979
REPLACE SERVICE LINES IN THE NORTH EAST REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY DECEMBER
3161 080.70221 3,991,219
REPLACE SERVICE LINES IN THE NORTH CENTRAL REGION ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY DECEMBER
3162 080.70222 9,157,730
REPLACE SERVICE LINES IN THE NORTH WEST REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD SYSTEM INTEGRITY DECEMBER
3163 080.70223 15,729,885
REPLACE SERVICE LINES IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY DECEMBER
3164 080.70224 3,864,974
REPLACE SERVICE LINES IN THE SOUTH EAST REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY DECEMBER
3165 080.70225 2,523,550
REPLACE SERVICE LINES IN THE SOUTH WEST REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY DECEMBER
3166 080.70226 5,364,278
REPLACE SERVICE LINES IN THE WEST FORT WORTH REGION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
3167 080.70227 2,204,967
REPLACE SERVICE LINES IN THE WEST ARLINGTON IRVING REGION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY DECEMBER
3168 080.70228 3,173,607
REPLACE SERVICE LINES IN THE WEST WEST REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
3169 080.70229 6,432,603
REPLACE METERS IN THE NORTH EAST REGION DUE TO HIGH RISK
DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY DECEMBER
3170 080.70230 6,520,284
REPLACE METERS IN THE NORTH CENTRAL REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY DECEMBER
3171 080.70231 4,119,940
REPLACE METERS IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
3172 080.70232 12,583,624
REPLACE METERS IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY DECEMBER
3173 080.70233 4,988,242
REPLACE METERS IN THE SOUTH EAST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
3174 080.70234 2,858,350
REPLACE METERS IN THE SOUTH WEST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY DECEMBER
MTX Additions
Page 99 of 178
318
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3175 080.70235 5,073,914
REPLACE METERS IN THE WEST FORT WORTH REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
3176 080.70236 4,056,290
REPLACE METERS IN THE WEST ARLINGTON IRVING REGION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
3177 080.70237 3,610,461
REPLACE METERS IN THE WEST WEST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
3178 080.70249 11,207
REPLACE DISTRICT REGULATOR STATION # 07 AND 11 IN STEPHENVILLE AND
ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY OCTOBER
3179 080.70252 4,774
INSTALL 400 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION
02 AND 300 FEET OF 2 INCH POLY AND 1331 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLDEN SYSTEM INTEGRITY OCTOBER
3180 080.70254 7,339
RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY AND 40 FEET OF 2 INCH
POLY ALONG SW 5TH STREET AND ABANDON 390 FEET OF 4 INCH STEEL TO
ACCOMMODATE THE CITY OF GRAND PRAIRIE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES OCTOBER
3181 080.70256 2,011
RELOCATE FACILITIES. INSTALL 60 FEET OF 4 INCH POLY ALONG MEADOW CREEK
DRIVE AND ABANDON 60 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF
IRVING IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
3182 080.70258 6,979
ABANDON DISTRICT REGULATOR STATION 09 AND 11 IN COMANCHE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY OCTOBER
3183 080.70259 22,273
INSTALL DISTRICT REGULATOR STATION AND 5 FEET OF 4 INCH STEEL AND 5 FEET
OF 6 INCH POLY ALONG RAMBLING WAY AND PARKER ROAD AND ABANDON
DISTRICT REGULATOR STATION AND 5 FEET OF 4 INCH STEEL AND 5 FEET OF 6
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY OCTOBER
3184 080.70260 16,574
INSTALL 320 FEET OF 2 INCH POLY AND INSTALL DISTRICT REGULATOR STATION
07,12 AND 23 ALONG W 16TH STREET AND ABANDON 540 FEET OF 2 INCH STEEL,
130 FEET OF 2 INCH POLY, 14 FEET OF 4 INCH POLY AND DISTRICT REGULATOR
STATION 07, 12, AND 23 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY OCTOBER
3185 080.70268 2,618
RELOCATE FACILITIES. INSTALL 240 FEET OF 4 INCH POLY ALONG FRANCIS DRIVE
AND ABANDON 240 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF
COLLEGE STATION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS COLLEGE STATION
RELOCATION OF
FACILITIES OCTOBER
3186 080.70272 19,780
RELOCATE FACILITIES. INSTALL 100 FEET OF 6 INCH POLY ALONG PARKER ROAD
AND CUSTER PKWY AND ABANDON 100 FEET OF 6 INCH POLY TO ACCOMMODATE
THE CITY OF PLANO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES OCTOBER
3187 080.70274 15,926
RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH STEEL ALONG NANTUCKET
ROAD AND ABANDON 40 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF
RICHARDSON CITY PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
RELOCATION OF
FACILITIES OCTOBER
3188 080.70275 4,134
RELOCATE FACILITIES. INSTALL 330 FEET OF 4 INCH POLY ALONG SEETON ROAD
AND ABANDON 550 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF GRAND
PRAIRIE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES OCTOBER
3189 080.70277 18,937
INSTALL CLOCK SPRING ON LINE D IN DALLAS COUNTY TO REMEDIATE ANOMALIES
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3190 080.70285 44
ABANDON DISTRICT REGULATOR STATION #273 IN DALLAS IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3191 080.70289 8,387,690
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN
NORTH EAST REGION. ALL CUSTOMERS PARIS GROWTH DECEMBER
3192 080.70290 9,806,771
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN
NORTH CENTRAL REGION. ALL CUSTOMERS MCKINNEY GROWTH DECEMBER
3193 080.70291 8,315,121
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN
NORTH WEST REGION. ALL CUSTOMERS WICHITA FALLS GROWTH DECEMBER
3194 080.70292 11,503,145
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN
SOUTH DALLAS REGION. ALL CUSTOMERS DALLAS GROWTH DECEMBER
3195 080.70293 4,594,617
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN
SOUTH EAST REGION. ALL CUSTOMERS WACO GROWTH DECEMBER
3196 080.70294 11,918,939
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN
SOUTH WEST REGION. ALL CUSTOMERS ROUND ROCK GROWTH DECEMBER
3197 080.70295 10,077,022
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN
WEST FORT WORTH REGION. ALL CUSTOMERS FORT WORTH GROWTH DECEMBER
3198 080.70296 4,468,104
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN
WEST ARLINGTON REGION. ALL CUSTOMERS ARLINGTON GROWTH DECEMBER
3199 080.70297 1,897,312
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN
WEST REGION. ALL CUSTOMERS ABILENE GROWTH DECEMBER
3200 080.70298 3,464,712
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN
NORTH EAST REGION. ALL CUSTOMERS PARIS GROWTH DECEMBER
3201 080.70299 4,487,077
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN
NORTH CENTRAL REGION. ALL CUSTOMERS MCKINNEY GROWTH DECEMBER
3202 080.70300 3,554,582
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN
NORTH WEST REGION. ALL CUSTOMERS WICHITA FALLS GROWTH DECEMBER
3203 080.70301 1,804,178
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN
SOUTH REGION. ALL CUSTOMERS WACO GROWTH DECEMBER
3204 080.70302 2,106,031
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN
SOUTH EAST REGION. ALL CUSTOMERS WACO GROWTH DECEMBER
3205 080.70303 4,373,525
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN
SOUTH WEST REGION. ALL CUSTOMERS ROUND ROCK GROWTH DECEMBER
3206 080.70304 2,818,855
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN
WEST FORT WORTH REGION. ALL CUSTOMERS FORT WORTH GROWTH DECEMBER
3207 080.70305 1,746,331
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN
WEST ARLINGTON REGION. ALL CUSTOMERS ARLINGTON GROWTH DECEMBER
3208 080.70306 691,283
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN
WEST REGION. ALL CUSTOMERS ABILENE GROWTH DECEMBER
3209 080.70307 853,716 REPLACE SERVICE LINES IN THE NORTH EAST DISTRICT. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
3210 080.70308 1,216,005
NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN NORTH CENTRAL
DISTRICT. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER
3211 080.70309 1,846,042 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN NORTH WEST DISTRICT. ALL CUSTOMERS BOYD SYSTEM INTEGRITY DECEMBER
3212 080.70310 359,719 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN SOUTH DALLAS. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
3213 080.70311 889,608 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN SOUTH EAST DISTRICT. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
3214 080.70312 576,280 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN SOUTH WEST DISTRICT. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY DECEMBER
3215 080.70313 897,559 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN WEST FORT WORTH. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
3216 080.70314 1,068,617
NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN WEST ARLINGTON
IRVING. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
3217 080.70315 481,848 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN WEST DISTRICT. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
3218 080.70316 646,031 NON GROWTH FUNCTIONAL MAINS IN NORTH EAST. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
3219 080.70317 1,131,893
NON GROWTH FUNCTIONAL FOR THE REPLACEMENT OF MAINS IN NORTH
CENTRAL REGION. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER
3220 080.70318 1,084,063
NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN NORTH WEST
REGION. ALL CUSTOMERS BOYD SYSTEM INTEGRITY DECEMBER
3221 080.70319 371,969 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN SOUTH DALLAS. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
3222 080.70320 632,913
NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN SOUTH EAST
REGION. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
3223 080.70321 392,781
NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN SOUTH WEST
REGION. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY DECEMBER
3224 080.70322 633,405 NON GROWTH FUNCTIONAL MAINS PROJECT IN WEST FORT WORTH. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
MTX Additions
Page 100 of 178
319
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3225 080.70323 640,455
NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN WEST
ARLINGTON REGION. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
3226 080.70324 663,155 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN WEST REGION. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
3227 080.70325 1,662,461
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN
NORTH EAST REGION. ALL CUSTOMERS GARLAND GROWTH DECEMBER
3228 080.70326 1,321,606
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN
NORTH CENTRAL REGION. ALL CUSTOMERS MCKINNEY GROWTH DECEMBER
3229 080.70327 2,107,382
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN
NORTH WEST REGION. ALL CUSTOMERS BOYD GROWTH DECEMBER
3230 080.70328 773,626
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN
SOUTH DALLAS REGION. ALL CUSTOMERS DALLAS GROWTH DECEMBER
3231 080.70329 1,384,673
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN
SOUTH EAST REGION. ALL CUSTOMERS WACO GROWTH DECEMBER
3232 080.70330 504,274
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN
SOUTH WEST REGION. ALL CUSTOMERS ROUND ROCK GROWTH DECEMBER
3233 080.70331 1,183,227
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN
WEST FORT WORTH REGION. ALL CUSTOMERS FORT WORTH GROWTH DECEMBER
3234 080.70332 900,482
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN
WEST ARLINGTON REGION. ALL CUSTOMERS ARLINGTON GROWTH DECEMBER
3235 080.70333 1,521,042 NON GROWTH FUNCTIONAL METERS IN WEST DISTRICT. ALL CUSTOMERS ABILENE GROWTH DECEMBER
3236 080.70334 1,167,247
NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN
NORTH EAST REGION. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
3237 080.70335 421,342
NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN
NORTH CENTRAL REGION. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER
3238 080.70336 2,319,101
NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN
NORTH WEST REGION. ALL CUSTOMERS BOYD SYSTEM INTEGRITY DECEMBER
3239 080.70337 8,745,348 NON GROWTH FUNCTIONAL CATHODIC PROTECTION IN SOUTH DALLAS. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
3240 080.70338 1,571,867
NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN
SOUTH EAST REGION. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
3241 080.70339 465,870
NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN
SOUTH WEST REGION. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY DECEMBER
3242 080.70340 1,309,290 NON GROWTH FUNCTIONAL CATHODIC PROTECTION IN WEST FORT WORTH. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
3243 080.70341 571,098
NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN
WEST ARLINGTON REGION. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
3244 080.70342 1,547,412
NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN
WEST REGION. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
3245 080.70343 7,582
RELOCATE FACILITIES. INSTALL 780 FEET OF 2 INCH POLY AND ABANDON 735
FEET OF 2 INCH STEEL ALONG COLLIER STREET TO ACCOMMODATE THE CITY OF
DENTON STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
3246 080.70344 45,909
PERFORM REPAIRS ON LINE D IN DALLAS COUNTY TO REMEDIATE ANOMALIES IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER
3247 080.70347 (216)
INSTALL 3284 FEET OF 6 INCH AND 3099 FEET OF 2 INCH POLY ALONG THE
STREETS OF MORNINGSTAR SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH JANUARY
3248 080.70350 574,232 INSTALL 13,325 FEET OF 4 INCH POLY ALONG MEADOW HAWK DRIVE. RESIDENTIAL ARLINGTON GROWTH SEPTEMBER
3249 080.70355 47,960
RELOCATE FACILITIES. INSTALL 500 FEET OF 6 INCH STEEL ALONG 1101 FRANCIS
DRIVE AND ABANDON 500 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF
COLLEGE STATION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS COLLEGE STATION
RELOCATION OF
FACILITIES OCTOBER
3250 080.70379 14,289
RELOCATE FACILITIES. INSTALL 1100 FEET OF 4 INCH POLY ALONG SKYLINE AND
ABANDON 1090 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF ROWLETT
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT
RELOCATION OF
FACILITIES OCTOBER
3251 080.70384 8,317
INSTALL 387 FEET OF 6 INCH POLY AND 220 FEET OF 4 INCH POLY ALONG
INTERSTATE 35. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROUND ROCK GROWTH DECEMBER
3252 080.70405 82,368
RELOCATE FACILITIES. INSTALL 2820 FEET OF 8 INCH POLY, 120 FEET OF 4 INCH
POLY AND 1700 FEET OF 2 INCH POLY ALONG RIVERSIDE DRIVE TO ACCOMODATE
CITY PAVING PROJECT AND ABANDON 800 FEET OF 6 INCH STEEL, 2410 FEET OF 8
INCH STEEL, 10 FEET OF 4 INCH STEEL, 40 FEET OF 4 INCH POLY AND 100 FEET OF
2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3253 080.70406 (164,925)
INSTALL 6 INCH POLY ALONG ROSEDALE AND FOREST PARK IN FORT WORTH AND
ABANDON 12 INCH STEEL TO ACCOMMODATE THIRD PARTY DAMAGE. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY FEBRUARY
3254 080.70409 912
ABANDON 14 FEET OF 2 INCH POLY ALONG 3RD STREET IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
3255 080.70412 12,564
ABANDON 860 FEET OF 4 INCH STEEL AND 35 FEET OF 3 INCH STEEL ALONG HILL
STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY OCTOBER
3256 080.70436 12,000
INSTALL 745 FEET OF 4 INCH POLY ALONG S 4TH STREET IN ABILENE TX AND
ABANDON 340 FEET OF 6 INCH CAST IRON, 30 FEET OF 6 INCH STEEL, 25 FEET OF 6
INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
3257 080.70437 (69)
INSTALL 1,979 FEET OF 8 INCH AND 509 FEET OF 6 INCH POLY ALONG HWY 195.
DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS GEORGETOWN GROWTH JANUARY
3258 080.70438 2,936
INSTALL 556 FEET OF 6 INCH AND 5730 FEET OF 2 INCH POLY ALONG THE STREETS
OF OAK BEND SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JULY
3259 080.70443 (132)
INSTALL 2240 FEET OF 6 INCH, 2616 FEET OF 4 INCH, AND 4388 FEET OF 2 INCH
POLY ALONG SHELL SPUR ROAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH JANUARY
3260 080.70444 (62,295)
RELOCATE FACILITIES. INSTALL 935 FEET OF 20 INCH STEEL AND ABANDON 925
FEET OF 20 INCH STEEL ALONG LA PRADA DRIVE TO ACCOMMODATE TXDOT
IMPROVEMENT PROJECT. ALL CUSTOMERS MESQUITE
RELOCATION OF
FACILITIES DECEMBER
3261 080.70447 42,727
RELOCATE FACILITIES. INSTALL 1600 FEET OF 2 INCH AND 145 FEET OF 6 INCH
POLY ALONG CANADA DRIVE AND ABANDON 440 FEET OF 2 INCH AND 720 FEET OF
3 INCH POLY AND 440 FEET OF 3 INCH STEEL AND 145 FEET OF 6 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES DECEMBER
3262 080.70449 1,780
ABANDON DISTRICT REGULATOR STATION 120 ALONG N. EWING AVENUE IN
DALLAS, TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3263 080.70450 670 INSTALL 800 FEET OF 4 INCH POLY ALONG ELM STREET.
COMMERCIAL OR
INDUSTRIAL KEMP GROWTH JULY
3264 080.70455 35,136
RELOCATE FACILITIES. INSTALL 25 FEET OF 16 INCH STEEL ALONG SAMUELL
BOULEVARD AND ABANDON 25 FEET OF 16 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD TEXAS OF COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
3265 080.70462 801
INSTALL 905 FEET OF 6 INCH, 750 FEET OF 4 INCH AND 2,030 FEET OF 2 INCH POLY
ALONG STREETS OF ESTATES PHASE 2. RESIDENTIAL WAXAHACHIE GROWTH MARCH
3266 080.70470 1,181
ABANDON DISTRICT REGLUATOR STATION 143 AND 161 IN FORT WORTH TEXAS
ALONG HEMPHILL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3267 080.70475 2,265
RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH POLY ALONG SW ALSURY
BOULEVARD AND ABANDON 40 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY
OF BURLESON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BURLESON
RELOCATION OF
FACILITIES OCTOBER
3268 080.70476 11,327
REPLACE DISTRICT REGULATOR STATION # 04 ON BELL AND SANTA FE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROGERS SYSTEM INTEGRITY OCTOBER
3269 080.70477 5,731
INSTALL DISTRICT REGULATOR STATION 15 ALONG THE STREETS OF AVENUE D
AND MITCHELL IN BELTON TX AND ABANDON DISTRICT REGULATOR STATION 15 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY OCTOBER
3270 080.70478 17,317
RELOCATE FACILITIES. INSTALL 350 FEET OF 6 INCH POLY AND ABANDON 250
FEET OF 6 INCH POLY TO ACCOMMODATE CONSTRUCTION ON TELECOM LINE. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES NOVEMBER
MTX Additions
Page 101 of 178
320
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3271 080.70479 8,465
REPLACE DISTRICT REGULATOR STATION ALONG FANNIN IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY OCTOBER
3272 080.70492 84,617
RELOCATE FACILITIES. INSTALL 492 FEET OF 2 INCH POLY ALONG PINYON TREE
AND ABANDON 455 FEET OF 2 INCH AND 145 FEET OF 3 INCH POLY TO
ACCOMMODATE THE CITY OF DALLAS. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER
3273 080.70498 4,951
INSTALL 485 FEET OF 2 INCH POLY ALONG HERON AND ABANDON 400 FEET OF 2
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER
3274 080.70502 11,770
RELOCATE FACILITIES. INSTALL 1150 FEET OF 4 INCH POLY AND ABANDON 1150
FEET OF 3 INCH STEEL ALONG PALASOTA DRIVE TO ACCOMMODATE CITY OF
BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES OCTOBER
3275 080.70504 18,303
RELOCATE FACILITIES. INSTALL 1275 FEET OF 2 INCH POLY AND 750 FEET OF 4
INCH POLY ALONG SPRUCE STREET AND ABANDON 725 FEET OF 4 INCH STEEL,476
FEET OF 2 INCH STEEL, 70 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
WEST IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WEST
RELOCATION OF
FACILITIES OCTOBER
3276 080.70505 4,969
RELOCATE FACILITIES. INSTALL 40 FEET OF 6 INCH POLY AND ABANDON 30 FEET
OF 6 INCH POLY ALONG SACHSE ROAD TO ACCOMMODATE THE CITY OF SACHSE
IN BROWNWOOD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS SACHSE
RELOCATION OF
FACILITIES OCTOBER
3277 080.70511 3,295
REPLACE BONHAM DRS 24 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY OCTOBER
3278 080.70512 5,924
REPLACE ECTOR DRS 02 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ECTOR SYSTEM INTEGRITY OCTOBER
3279 080.70515 37,673
RELOCATE FACILITIES. INSTALL 2200 FEET OF 4 INCH POLY AND 900 FEET OF 2
INCH POLY ALONG CLAYTON ROAD TO ACCOMMODATE CITY OF FORT WORTH
STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3280 080.70520 (25) INSTALL 2400 FEET OF 2 INCH POLY ALONG STREETS OF SPRINGS ESTATES. RESIDENTIAL KELLER GROWTH MARCH
3281 080.70522 6,344
RELOCATE FACILITIES. INSTALL 750 FEET OF 4 INCH POLY ALONG BAILEY
BOSWELL ROAD AND ABANDON 700 FEET OF 4 INCH POLY TO ACCOMODATE CITY
OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW
RELOCATION OF
FACILITIES OCTOBER
3282 080.70523 16,053
INSTALL 1210 FEET OF 2 INCH POLY AND 1 DISTRICT REGLUATOR STATION AND
ABANDON 1059 FEET OF 2 INCH STEEL AND 1 DISTRICT REGLUATOR STATION
ALONG PURDUE AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY OCTOBER
3283 080.70524 13,797
REPLACE DISTRICT REGULATOR STATION 016 AND INSTALL 1300 FEET OF 2 INCH
POLY AND ABANDON 1274 FEET OF 2 INCH STEEL ALONG POMONA AVENUE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY OCTOBER
3284 080.70526 2,997
INSTALL DISTRICT REGULATOR STATION 06 ALONG ALONG 2ND STREET AND
DISTRICT REGULATOR STATION 06 IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY OCTOBER
3285 080.70527 3,224
INSTALL DISTRICT REGULATOR STATION 12 ALONG STARR STREET AND ABANDON
DISTRICT REGULATOR STATION 12 IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY OCTOBER
3286 080.70528 9,205
INSTALL 60 FEET OF 2 INCH POLY AND NEW DISTRICT REGLUATOR STATION
ALONG SHIRES STREET AND ABANDON DISTRICT REGLUATOR STATION, 60 FEET
OF 2 INCH POLY AND 35 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS
UNICORPORATED COUNTY
AREA, (GOODLET) SYSTEM INTEGRITY OCTOBER
3287 080.70529 3,314
INSTALL 715 FEET OF 2 INCH POLY ALONG BILL STREET AND ABANDON S203 DRS,
60 FEET OF 2 INCH POLY AND 60 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS
UNICORPORATED COUNTY
AREA, (GOODLET) SYSTEM INTEGRITY OCTOBER
3288 080.70530 14,860
INSTALL DISTRICT REGULATOR STATION 01, 10 FEET OF 3 INCH POLY AND 10 FEET
OF 4 INCH POLY ALONG CHURCH STREET AND ABANDON DISTRICT REGULATOR
STATION 01, 4 FEET OF 3 INCH POLY AND 10 FEET OF 4 INCH STEELIN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE SYSTEM INTEGRITY OCTOBER
3289 080.70531 4,298
INSTALL DISTRICT REGULATOR STATION 02, 30 FEET OF 3 INCH POLY AND 30 FEET
OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 02 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY OCTOBER
3290 080.70532 8,948
INSTALL 30 FEET OF 2 INCH POLY, 45 FEET OF 4 INCH POLY, DISTRICT
REGULATOR STATION 07 ALONG DALLAS STREET AND ABANDON 10 FEET OF 2
INCH STEEL, 10 FEET OF 4 INCH STEEL, DISTIRCT REGULATOR STATION 07 IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY OCTOBER
3291 080.70533 7,861
REPLACE CHILDRESS DISTRICT REGLUATOR STATION 07 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER
3292 080.70534 8,381
INSTALL 50 FEET OF 2 INCH POLY, 120 FEET OF 4 INCH POLY, 175 FEET OF 6 INCH
POLY, DISTRICT REGULATOR STATION 08 ALONG 4TH STREET NE AND ABANDON
230 FEET OF 8 INCH STEEL, 25 FEET OF 6 INCH STEEL, 10 FEET OF 4 INCH STEEL,
AND 80 FEET OF 3 INCH POLY, DISTRICT REGULATOR STATION 08 IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER
3293 080.70535 7,113
INSTALL 80 FEET OF 2 INCH AND 30 FEET OF 4 INCH POLY AND NEW DISTRICT
REGULATOR STATION 14 ALONG SOUTH MAIN STREET AND ABANDON DISTRICT
REGULATOR STATION, 60 FEET OF 2 INCH POLY AND 45 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER
3294 080.70536 6,206
INSTALL 80 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION 15 ALONG
9TH STREET AND ABANDON 5 FEET OF 3 INCH POLY AND 20 FEET OF 2 INCH AND 5
FEET OF 3 INCH STEEL AND S203 DISTRICT REGULATOR STATION 15 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER
3295 080.70537 11,126
INSTALL 100 FEET OF 2 INCH POLY AND 100 FEET OF 4 INCH POLY AND DISTRICT
REGULATOR STATION 17 ALONG NE 6TH STREET AND ABANDON DISTRICT
REGULATOR STATION 17, 10 FEET OF 2 INCH POLY AND 30 FEET OF 3 INCH STEEL
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER
3296 080.70538 20,614
INSTALL 1800 FEET OF 2 INCH POLY ALONG 10TH STREET AND ABANDON 1790
FEET OF LOW PRESSURE STEEL AND DISTRICT REGULATOR STATION 18 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER
3297 080.70539 10,950
INSTALL 75 FEET OF 4 INCH AND 30 FEET OF 2 INCH POLY AND NEW DISTRICT
REGULATOR STATION 20 ALONG SOUTH EAST 9TH ST AND ABANDON DISTRICT
REGLUATOR STATION AND 70 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER
3298 080.70540 18,007
INSTALL 40 FEET OF 4 INCH, 30 FEET OF 3 INCH AND 100 FEET OF 6 INCH POLY,
DISTRICT REGULATOR STATION 08 ALONG MORTON STREET AND ABANDON
DISTRICT REGULATOR STATION 08 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY DECEMBER
3299 080.70541 52,103
INSTALL 910 FEET OF 2 INCH POLY AND ABANDON 747 FEET OF 2 INCH STEEL AND
DRS 09 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY DECEMBER
3300 080.70542 3,955
REPLACE DENISON DRS 11 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER
3301 080.70543 5,523
REPLACE DENISON DRS39 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER
3302 080.70544 6,224
INSTALL 235 FEET OF 2 INCH POLY, 25 FEET OF 4 INCH POLY, DISTRICT
REGULATOR STATION 01 ALONG PINE STREET AND CHAPMAN STREET AND
ABANDON 250 FEET OF 4 INCH STEEL, 10 FEET OF 3 INCH STEEL, DISTRICT
REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WHITEWRIGHT SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 102 of 178
321
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3303 080.70545 5,267
INSTALL 60 FEET OF 2 INCH POLY, 80 FEET OF 4 INCH POLY, DISTRICT REGULATOR
STATION 03 ALONG GARDNER STREET AND ABANDON 222 FEET OF 3 INCH STEEL,
10 FEET OF 2 INCH STEEL, DISTRICT REGULATOR STATION 03 IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITEWRIGHT SYSTEM INTEGRITY OCTOBER
3304 080.70546 219,308
INSTALL 175 FEET OF 4 INCH, 20 FEET OF 3 INCH, AND 1900 FEET OF 2 INCH POLY
AND ABANDON DISTRICT REGULATOR STATION 05, 120 FEET OF 4 INCH AND 2821
FEET OF 3 INCH STEEL ALONG LOCUST STREET IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITEWRIGHT SYSTEM INTEGRITY OCTOBER
3305 080.70547 4,311
INSTALL DISTRICT REGULATOR STATION 01 ALONG TRAVIS STREET AND MAIN
STREET AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEONARD SYSTEM INTEGRITY OCTOBER
3306 080.70548 109,311
INSTALL 2900 FEET OF 2 INCH AND 225 FEET OF 4 INCH POLY AND ABANDON
DISTRICT REGULATOR STATION 02, 700 FEET OF 4 INCH, 2512 FEET OF 3 INCH, AND
44 FEET OF 2 INCH STEEL AND 2 FEET OF 2 INCH AND 100 FEET OF 1.25 INCH POLY
ALONG THE STREETS OF LEONARD IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEONARD SYSTEM INTEGRITY OCTOBER
3307 080.70549 5,018
INSTALL 85 FEET OF 2 INCH POLY, 45 FEET OF 4 INCH POLY, DISTRICT REGULATOR
STATION 03 ALONG PARMELE STREET AND THOMAS STREET AND ABANDON 135
FEET OF 4 INCH STEEL, DISTRICT REGULATOR STATION 03 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEONARD SYSTEM INTEGRITY OCTOBER
3308 080.70551 33,364
INSTALL 2300 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR
STATION 05, 683 FEET OF 4 INCH, 2469 FEET OF 3 INCH, AND 301 FEET OF 2 INCH
STEEL AND 520 FEET OF POLY ALONG THE STREETS OF LEONARD IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEONARD SYSTEM INTEGRITY OCTOBER
3309 080.70552 3,960
INSTALL DISTRICT REGULATOR STATION 01 ALONG GRIMES STREET AND
BALLENTINE STREET AND ABANDON DISTRICT REGULATOR STATION 01 IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY OCTOBER
3310 080.70553 8,913
INSTALL 400 FEET OF 4 INCH POLY, 25 FEET OF 2 INCH POLY, DISTRICT
REGULATOR STATION 04 ALONG AUGUSTUS STREET AND ABANDON 433 FEET OF
2 INCH STEEL, DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY DECEMBER
3311 080.70554 12,365
INSTALL 920 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY ALONG SAUNDERS
AND DISTRICT REGULATOR STATION ON 4TH AND ABANDON 335 FEET OF 3 INCH
STEEL AND DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY OCTOBER
3312 080.70555 15,688
INSTALL 225 FEET OF 4 INCH POLY AND 2970 FEET OF 2 INCH POLY AND ABANDON
1,898 FEET OF 3 INCH STEEL, 553 FEET OF 4 INCH STEEL, 171 FEET OF 3 INCH
POLY, 167 FEET OF 2 INCH POLY, 219 FEET OF 2 INCH STEEL ALONG NW FRONT
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAVOY SYSTEM INTEGRITY OCTOBER
3313 080.70557 14,186
RELOCATE FACILITIES. INSTALL 750 FEET OF 2 INCH POLY ALONG CEDAR DRIVE
AND ABANDON 750 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF IRVING
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
3314 080.70564 32,874
RELOCATE FACILITIES. INSTALL 24 FEET OF 2 INCH POLY, 288 FEET OF 4 INCH
POLY AND 1009 FEET OF 6 INCH POLY ALONG HARWOOD ROAD AND ABANDON 14
FEET OF 2 INCH STEEL, 93 FEET OF 3 INCH STEEL, 88 FEET OF 4 INCH STEEL AND
990 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF EULESS STREET PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS
RELOCATION OF
FACILITIES DECEMBER
3315 080.70566 27,747
INSTALL 1610 FEET OF 4 INCH POLY AND 635 FEET OF 2 INCH POLY AND ABANDON
1,497 FT OF 3 INCH STEEL, 826 FEET OF 4 INCH STEEL, 130 FEET OF 4 INCH
DUPONT, 154 FEET OF 4 INCH POLY, 140 FEET OF 4 INCH STEEL, AND 292 FEET OF
3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS LEONARD SYSTEM INTEGRITY OCTOBER
3316 080.70575 12,336 INSTALL 2 INCH POLY SERVICE LINE ALONG AVONDALE HASLET ROAD.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH JANUARY
3317 080.70576 (123,592)
INSTALL 3430 FEET OF 8 INCH POLY ALONG RONALD REAGAN. DEVELOPER
INSTALLED FACILITIES. ALL CUSTOMERS GEORGETOWN GROWTH APRIL
3318 080.70577 452
INSTALL 2510 FEET OF 2 INCH POLY ALONG THE STREETS OF MEADOW RUN
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH MARCH
3319 080.70583 1,074
INSTALL 800 FEET OF 6 INCH, 1435 FEET OF 4 INCH AND 6150 FEET OF 2 INCH POLY
ALONG STREETS OF ENCLAVE PHASE 1 & 2. RESIDENTIAL WAXAHACHIE GROWTH JULY
3320 080.70585 679
INSTALL 4800 FEET OF 2 INCH AND 3490 FEET OF 4 INCH POLY ALONG THE
STREETS OF WOLF CREEK FARMS SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL MELISSA GROWTH JUNE
3321 080.70590 (96,432)
RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY AND 780 FEET OF 2"
POLY AND ABANDON 700 FEET OF 4 POLY TO ACCOMMODATE THE CONSTRUCTION
OF SMU RESIDENTIAL. ALL CUSTOMERS UNIVERSITY PARK
RELOCATION OF
FACILITIES APRIL
3322 080.70594 214 INSTALL 3500 FEET OF 6 INCH POLY ALONG HERITAGE TOWNE SUBDIVISION. ALL CUSTOMERS GRAND PRAIRIE GROWTH DECEMBER
3323 080.70595 1,242,515
INSTALL DISTRICT REGULATOR STATION, 2800 FEET OF 6 INCH POLY AND 430
FEET OF 4 INCH STEL ALONG THE STREETS OF WYLIE. ALL CUSTOMERS WYLIE
SYSTEM
IMPROVEMENT DECEMBER
3324 080.70596 37,539
INSTALL 1,465 FEET OF 4 INCH AND 4,150 FEET OF 2 INCH POLY ALONG THE
STREETS OF HERITAGE TOWNE SUBDIVISION IN GRAND PRAIRIE. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL GRAND PRAIRIE GROWTH DECEMBER
3325 080.70597 1,059
INSTALL 208 FEET OF 6 INCH, 3231 FEET OF 4 INCH, AND 2133 FEET OF 2 INCH
POLY ALONG THE STREETS OF PRIMROSE CROSSING SUBDIVISION. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER
3326 080.70598 152
INSTALL 1,426 FEET OF 2 INCH AND 2,868 FEET OF 4 INCH POLY ALONG STREETS
OF PRIMROSE PHASE 7. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER
3327 080.70599 32,357
INSTALL 1,100 FEET OF 6 INCH POLY 2,600 FEET OF 2 INCH POLY ALONG BRITTON
ROAD AND NOAH STREET AND ABANDON 4,587 FEET OF 6 INCH POLY, 370 FEET OF
6 INCH STEEL, 1,400 FEET OF 3 INCH STEEL, AND AND DISTRICT REGULATOR
STATION 01 AND 08 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY OCTOBER
3328 080.70603 183,703
INSTALL 3,294 FEET OF 4 INCH AND 630 FEET OF 2 INCH POLY ALONG THE
STREETS OF PRIMROSE CROSSING SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER
3329 080.70605 185,794
INSTALL 2570 FEET OF 4 INCH AND 4100 FEET OF 2 INCH POLY ALONG THE
STREETS OF THE VIEW AT THE RESERVES. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANSFIELD GROWTH OCTOBER
3330 080.70606 21,459
RELOCATE FACILITIES. INSTALL 114 FEET OF 4 INCH POLY ALONG NORTH BELL
AVENUE AND ABANDON 475 FEET OF 4 INCH STEEL, 20 FEET OF 3 INCH POLY AND
760 FEET OF 2 INCH POLY TO ACCOMODATE CITY OF DENTON UTILITY AND STREET
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
3331 080.70608 9,759
INSTALL 640 FEET OF 2 INCH POLY AND ABANDON 625 FEET OF 2 INCH STEEL
ALONG ROGERS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO SYSTEM INTEGRITY OCTOBER
3332 080.70610 10,024
INSTALL DISTRICT REGULATOR STATION 07, 340 FEET OF 6 INCH POLY ALONG
BURNETT STREET AND ABANDON DISTRICT REGULATOR STATION 07, 11 FEET OF 4
INCH STEEL, 61 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3333 080.70611 188,849
INSTALL DISTRICT REGULATOR STATION #8 AND 460 FEET OF 4 INCH AND 240
FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION #8 AND 41
FEET OF 4 INCH STEEL AND 24 FEET OF 4 INCH, 132 FEET OF 6 INCH POLY ALONG
BAYLOR STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
3334 080.70612 12,194
INSTALL 230 FEET OF 2 INCH AND 120 FEET OF 4 INCH POLY ALONG LAFAYETTE ST
AND ABANDON 10 FEET OF 2 INCH STEEL AND 370 FEET OF 4 INCH POLY AND
REPLACE WICHITA FALLS DRS013 IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3335 080.70614 7,024
INSTALL 170 FEET OF 2 INCH AND 70 FEET OF 4 INCH POLY ALONG REDWOOD
AVENUE AND ABANDON 10 FEET OF 2 INCH AND 40 FEET OF 4 INCH STEEL AND
REPLACE WICHITA FALLS DRS043 IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 103 of 178
322
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3336 080.70615 6,903
INSTALL 50 FEET OF 4 INCH AND 60 FEET OF 2 INCH POLY AND DISTRICT
REGULATOR STATION 045 ALONG GRANT STREET AND ABANDON 10 FEET OF 3
INCH STEEL AND 10 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION 045
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3337 080.70616 5,594
INSTALL 70 FEET OF 4 INCH AND 90 FEET OF 2 INCH POLY ALONG BLUFF ST AND
ABANDON 5 FEET OF 4 INCH STEEL AND 95 FEET OF 2 INCH POLY AND REPLACE
WICHITA FALLS DRS046 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3338 080.70617 9,014
INSTALL 450 FEET OF 2 INCH AND 70 FEET OF 4 INCH POLY ALONG BLUFF ST AND
ABANDON 10 FEET OF 4 INCH, 10 FEET OF 3 INCH, AND 10 FEET OF 2 INCH STEEL
AND REPLACE WICHITA FALLS DRS062 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3339 080.70618 169,666
INSTALL DISTRICT REGULATOR STATION #66 AND 30 FEET OF 6 INCH POLY AND
250 FEET OF 6 INCH POLY AND ABANDON DISTRICT REGULATION STATION #66 AND
97 FEET OF 6 INCH POLY ALONG STREET OF WICHITA FALLS IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY APRIL
3340 080.70619 136,363
INSTALL DISTRICT REGULATOR STATION #67 AND INSTALL 4 INCH POLY ALONG
FILLMORE STREET AND ABANDON DISTRICT REGULATOR STATION FISHER
#S203&NBSP; AND 19 FEET OF 2 INCH STEEL AND 188 FEET OF 4 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY JUNE
3341 080.70620 211,941
INSTALL DISTRICT REGULATOR STATION #83 AND 425 FEET OF 4 INCH, 130 FEET
OF 6 INCH POLY AND ABANDON DISTRICT REGULATOR STATION #83, 248 FEET OF
6 INCH STEEL AND 3 FEET OF 6 INCH POLY ALONG SANTA FE STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
3342 080.70625 13,342 INSTALL 2 INCH POLY SERVICE LINE ALONG AIRPORT FREEWAY.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH JANUARY
3343 080.70633 2,857
RELOCATE FACILITIES. INSTALL 250 FEET OF 2 INCH POLY ALONG BATES AND ELM
AND ABANDON 418 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF
STEPHENVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS STEPHENVILLE
RELOCATION OF
FACILITIES OCTOBER
3344 080.70636 8,201
INSTALL 1280 FEET OF 2 INCH POLY ALONG PASADENA STREET AND ABANDON
1118 FEET OF 2 INCH STEEL, 120 FEET OF 2 INCH POLY, 6 FEET OF 4 INCH STEEL
AND DISTRICT REGULATOR STATION 02 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.029. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY OCTOBER
3345 080.70638 11,919
INSTALL 1,425 FEET OF 2 INCH POLY ALONG PENN STREET AND ABANDON 1,495
FEET OF 2 INCH STEEL, 5 FEET OF 2 INCH POLY, 22 FEET OF 3 INCH STEEL, 5 FEET
OF 6 INCH STEEL AND DISTRICT REGULATOR STATION 03 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY OCTOBER
3346 080.70639 17,176
INSTALL 2050 FEET OF 2 INCH POLY AND ABANDON 2343 FEET OF 2 INCH STEEL
AND DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY OCTOBER
3347 080.70643 202,483
INSTALL DISTRICT REGULATOR STATION # 17, 30 FEET OF 2 INCH, 225 FEET OF 6
INCH POLY AND ABANDON DISTRICT REGULATOR STATION #17, 64 FEET OF 2 INCH
STEEL AND 139 FEET OF 4 INCH STEEL ALONG FULTON STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER
3348 080.70644 28,087
INSTALL 2777 FEET OF 2 INCH POLY ALONG BRADSHAW STREET AND ABANDON
DISTRICT REGULATOR STATION 28, 1436 FEET OF 3 INCH POLY AND 1269 OF 3
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER
3349 080.70650 21,644
RELOCATE FACILITIES. INSTALL 1800 FEET OF 2 INCH POLY ALONG AUSTIN AND
OAK AND ABANDON 482 FEET OF 2 INCH POLY AND 1310 FEET OF 2 INCH STEEL TO
ACCOMMODATE THE CITY OF DELEON IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DELEON
RELOCATION OF
FACILITIES OCTOBER
3350 080.70655 13,431
INSTALL 510 FEET OF 4 INCH POLY ALONG THE STREETS OF RAYZOR RANCH
SENIOR LIVING CENTER. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL DENTON GROWTH SEPTEMBER
3351 080.70664 508
INSTALL 1,775 FEET OF 2 INCH POLY, 2,070 FEET OF 4 INCH POLY AND 305 FEET OF
6 INCH POLY ALONG THE STREETS OF HARVEST SUBDIVISION IN NORTHLAKE, TX. RESIDENTIAL NORTHLAKE GROWTH MARCH
3352 080.70678 11,631
RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH POLY ALONG LEONARD
STREET AND WALTERS STREET AND ABANDON 2725 FEET OF 2 INCH STEEL TO
ACCOMODATE CITY OF LEWISVILLE STREET PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE
RELOCATION OF
FACILITIES OCTOBER
3353 080.70681 242,142
INSTALL 2,036 FEET OF 4 INCH POLY ALONG THE STREET OF AUBREY RETAIL
COMMERCIAL.
COMMERCIAL OR
INDUSTRIAL AUBREY GROWTH SEPTEMBER
3354 080.70683 29,081
INSTALL 3,885 FEET OF 2 INCH AND 1,940 FEET OF 6 INCH POLY ALONG THE
STREETS OF CAMBRIDGE BROOK SUBDIVISION IN DENTON COUNTY. RESIDENTIAL DENTON GROWTH DECEMBER
3355 080.70686 719,017
RELOCATE FACILITIES. INSTALL 335 FEET OF 4 INCH AND 4356 OF 2 INCH POLY
AND ABANDON 2090 FEET OF 2 INCH AND 1252 FEET OF 3 INCH STEEL, 263 FEET
OF 2 INCH, 699 FEET OF 3 INCH AND 128 FEET OF 4 INCH POLY ALONG THE
STREETS OF KELLER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY OCTOBER
3356 080.70688 180,119
INSTALL 4,845 FEET OF 2 INCH POLY ALONG THE STREETS OF GLENWOOD
MEADOWS SUBDIVISION IN DENTON. RESIDENTIAL DENTON GROWTH OCTOBER
3357 080.70691 1,309
RELOCATE FACILITIIES. INSTALL SIX 0.75 INCH POLY SERVICE LINES ALONG
ANCHOR DRIVE AND ABANDON SIX 0.75 INCH POLY SERVICE LINES TO
ACCOMMODATE THE CITY OF PLANO ALLEY PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES OCTOBER
3358 080.70693 15,777
RELOCATE FACILITIES. INSTALL 1240 FEET OF 2 INCH POLY AND ABANDON 1240
FEET OF 4 INCH STEEL ALONG MIMS STREET TO ACCOMMODATE CITY OF DALLAS
STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3359 080.70702 28,068
RELOCATE FACILITIES. INSTALL 2300 FEET OF 4 INCH POLY ALONG STREETS OF
DALLAS AND ABANDON 2200 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
3360 080.70706 7,332
ABANDON 276 FEET OF 2 INCH STEEL, 847 FEET OF 2 INCH POLY, 521 FEET OF 1.25
INCH POLY, 302 FEET OF 1 INCH STEEL, 197 FEET OF 1.25 STEEL, 20 FEET OF 2
INCH STEEL, 27 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION 05
ALONG WINKLER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GORMAN SYSTEM INTEGRITY OCTOBER
3361 080.70708 2,285
ABANDON DISTRICT REGULATOR STATION 05 AND DISTRICT REGULATOR STATION
03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HICO SYSTEM INTEGRITY OCTOBER
3362 080.70711 1,124
INSTALL 1462 FEET OF 4 INCH POLY AND 660 FEET OF 6 INCH POLY ALONG
CHITALPA STREET. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LEANDER GROWTH JUNE
3363 080.70712 7,337
INSTALL 5 FEET OF 10 INCH STEEL AND 268 FEET OF 2 INCH POLY AND ABANDON 3
FEET OF 10 INCH STEEL AND 280 FEET OF 4 INCH POLY ALONG ALONG WILLIAM A
TAYLOR IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
3364 080.70722 268
INSTALL 5500 FEET OF 2 INCH POLY ALONG THE STREETS OF DEVONSHIRE
VILLAGE PHASE 7. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH JULY
3365 080.70723 3,364
RELOCATE FACILITIES. INSTALL 45 FEET OF 2 INCH POLY AND ABANDON 32 FEET
OF 2 INCH STEEL ALONG CITADEL AND CHATEAU IN ACCORDANCE WITH THE
RAILAROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
3366 080.70725 550
INSTALL 5187 FEET OF 2 INCH POLY ALONG THE STREETS OF PANCHASARP
FARMS SUBDIVISON. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BURLESON GROWTH APRIL
3367 080.70734 22,434
RELOCATE FACILTIES. INSTALL 1340 FEET OF 4 INCH POLY AND ABANDON 1340
FEET OF 4 INCH STEEL ALONG WESSEX AVENUE IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 104 of 178
323
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3368 080.70735 25,666
RELOCATE FACILITIES. INSTALL 1400 FEET OF 4 INCH POLY, 50 FEET OF 6 INCH
POLY, 90 FEET OF 8 INCH POLY AND ABANDON 1400 FEET OF 4 INCH STEEL, 50
FEET OF 6 INCH STEEL, AND 90 FEET OF 8 STEEL ALONG OVERTON PARK TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3369 080.70739 14,290
RELOCATE FACILITIES. INSTALL 1000 FEET OF 4 INCH POLY AND ABANDON 930
FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3370 080.70741 2,393
INSTALL 1360 FEET OF 2 INCH POLY ALONG EMERALD PARKWAY. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH SEPTEMBER
3371 080.70744 1,228
INSTALL 8170 FEET OF 2 INCH POLY ALONG THE STREETS OF WILDCAT
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH MARCH
3372 080.70746 45,451
RELOCATE FACILITIES. INSTALL 50 FEET OF 8 INCH, 250 FEET OF 6 INCH AND 105
FEET OF 4 INCH POLY ALONG MIDWAY ROAD AND ABANDON 40 FEET OF 8 INCH
STEEL 250 FEET OF 6 INCH AND 115 FEET OF 4 INCH POLY TO ACCOMMODATE THE
CITY OF ADDISON STREET PROJECT. ALL CUSTOMERS ADDISON
RELOCATION OF
FACILITIES OCTOBER
3373 080.70750 22,730
RELOCATE FACILITIES. INSTALL 1600 FEET OF 4 INCH POLY ALONG FM 696 AND
ABANDON 1600 FEET OF 2 INCH POLY TO ACCOMMODATE TXDOT PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEXINGTON
RELOCATION OF
FACILITIES OCTOBER
3374 080.70768 363
INSTALL 430 FEET OF 2 INCH, 1130 FEET OF 4 INCH, AND 580 FEET OF 6 INCH POLY
ALONG ROCK PRAIRIE ROAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH MARCH
3375 080.70787 4,041
RELOCATE FACILITIES. INSTALL 50 FEET OF 4 INCH POLY ALONG CARUTH PARK
AND ABANDON 24 FEET OF POLY TO ACCOMMODATE THE CITY OF UNIVERSITY
PARK IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
RELOCATION OF
FACILITIES OCTOBER
3376 080.70790 561
INSTALL 3226 FEET OF 4 INCH AND 2036 FEET OF 2INCH POLY ALONG THE
STREETS OF VENTANA SUBDIVISION. RESIDENTIAL FORT WORTH GROWTH MARCH
3377 080.70797 5,865
INSTALL DISTRICT REGLUATOR STATION 01 ALONG 23RD STREET AND COLLEGE
AVENUE AND ABANDON DISTRICT REGLUATOR STATION IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER
3378 080.70798 3,828
REPLACE DISTRICT REGULATOR STATION 409 IN FORT WORTH AND ABANDON
DISTRICT REGULATOR STATION IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3379 080.70799 5
INSTALL 1130 FEET OF 4 INCH POLY AND 1800 FEET OF 2 INCH POLY ALONG THE
STREETS OF DOUBLE EAGLE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ABILENE GROWTH JANUARY
3380 080.70806 11,805
INSTALL 750 FT OF 2 INCH POLY ABANDON 740 FEET OF 1.25 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY OCTOBER
3381 080.70809 3,304
RELOCATE FACILITIES. INSTALL 60 FEET OF 6 INCH POLY ALONG NOLAN RIVER
ROAD AND ABANDON 50 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF
CLEBURNE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CLEBURNE
RELOCATION OF
FACILITIES OCTOBER
3382 080.70810 23,113
RELOCATE FACILITIES. INSTALL 4,287 FEET OF 2 INCH POLY AND ABANDON 4,398
FEET OF 2 INCH POLY ALONG FM4 IN CLEBURNE DUE TO ACCOMOCATE TXDOT
HIGHWAY IMPROVEMENTS AND STORM DRAIN EXTENSION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
RELOCATION OF
FACILITIES OCTOBER
3383 080.70816 3,704
RELOCATE FACILITIES. INSTALL 260 FEET OF 2 INCH POLY ALONG NORTH ANNA
DRIVE AND ABANDON 395 FEET OF 2 INCH STEEL AND 40 FEET OF 4 INCH POLY TO
ACCOMODATE THE CITY OF ALLEN PAVING IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN
RELOCATION OF
FACILITIES OCTOBER
3384 080.70817 4
INSTALL 4200 FEET OF 6 INCH POLY ALONG CASTLE DRIVE DEVELOPER
INSTALLED FACILITIES. ALL CUSTOMERS ROWLETT GROWTH JANUARY
3385 080.70822 95,266
INSTALL 7 CLOCKSPRING ALONG LINE CA (2ND)(EAST) IN TARRANT COUNTY TO
REMEDIATE ANOMALIES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3386 080.70824 5,844
INSTALL 100 FEET OF 2 INCH POLY ALONG US BUSINESS 81 AND ABANDON 485
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY OCTOBER
3387 080.70831 14,417
INSTALL 3 CLOCKSPRINGS ALONG LINE D IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
3388 080.70835 32,987
INSTALL 2,600 FEET OF 2 INCH POLY AND ABANDON 2,585 FEET OF 2 INCH STEEL
ALONG SAN ANTONIO STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
3389 080.70837 9,266
INSTALL 1736 FEET OF 8 INCH, 2496 FEET OF 6 INCH, 722 FEET OF 4 INCH AND 308
FEET OF 2 INCH POLY ALONG THE STREETS OF HORIZON LAKE SUBDIVISION.
DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LEANDER GROWTH JUNE
3390 080.70840 33,514
RELOCATE FACILITIES. INSTALL 15 FEET OF 2 INCH AND 610 FEET OF 8 INCH POLY
ALONG LIVE OAK AND ABANDON 625 FEET OF 8 INCH STEEL TO ACCOMMODATE
CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES DECEMBER
3391 080.70842 8,923
RELOCATE FACILITIES. INSTALL 535 FEET OF 2 INCH POLY ALONG MCCLAIN
STREET AND ABANDON 525 FEET OF 1.25 INCH STEEL AND 112 FEET OF 2 INCH
POLY TO ACCOMMODATE CITY OF PRINCETON STREET PROJECT IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PRINCETON
RELOCATION OF
FACILITIES OCTOBER
3392 080.70843 11,944
INSTALL 500 FEET OF 6 INCH POLY AND 100 FEET OF 4 INCH POLY AND ABANDON
495 FEET OF 6 INCH POLY AND 95 FEET OF 4 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SACHSE SYSTEM INTEGRITY OCTOBER
3393 080.70848 (92)
INSTALL 3310 FEET OF 2 INCH AND 1730 FEET OF 4 INCH POLY ALONG THE
STREETS OF SOUTH OAK SUBDIVISION. RESIDENTIAL LITTLE ELM GROWTH MARCH
3394 080.70849 7,867
INSTALL 10 FEET OF 16 INCH STEEL AND ABANDON 10 FEET OF 16 INCH STEEL
ALONG PIPELINE ROAD AND EULESS IN EULESS IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY OCTOBER
3395 080.70850 156
INSTALL 1,400 FEET OF 4 INCH POLY TO SERVE ATWOODS COMMERCIAL.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL CROSS ROADS GROWTH JULY
3396 080.70857 27,006
RELOCATE FACILITIES. INSTALL 709 FEET OF 2 INCH POLY AND 822 FEET OF 4
INCH POLY AND ABANDON 694 FEET OF 2 INCH STEEL AND 785 FEET OF 3 INCH
STEEL ALONG RUSK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ROANOKE
RELOCATION OF
FACILITIES OCTOBER
3397 080.70859 5,016
RELOCATE FACILITIES. INSTALL 95 FEET OF 6 INCH POLY ALONG HOLLIDAY CREEK
AND ABANDON 95 FEET OF 6 INCH STEEL TO ACCOMMODATE TXDOT BRIDGE
WIDENING PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
RELOCATION OF
FACILITIES OCTOBER
3398 080.70868 7,883
INSTALL 1000 FEET OF 2 INCH POLY ALONG PARK PLACE AND ABANDON 1000 FEET
OF 2 INCH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY OCTOBER
3399 080.70873 6,948
INSTALL 420 FEET OF 4 INCH POLY ALONG W ROBERTS STREET AND ABANDON 392
FEET OF 4 INCH STEEL AND 28 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORMAN SYSTEM INTEGRITY OCTOBER
3400 080.70875 6,141
RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY ALONG LAZY LANE
DRIVE AND ABANDON 400 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
BRYAN STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES OCTOBER
3401 080.70876 71,294
INSTALL 2200 FEET OF 4 INCH AND 3300 FEET OF 2 INCH POLY ALONG THE NEW
MITCHELL FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANSFIELD GROWTH JUNE
3402 080.70884 7,575
REPLACE 24 HIGH PRESSURE AND LOW PRESSURE REGULATORS OFF OF FARM
TAPS ALONG S2 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER
3403 080.70892 3,457
INSTALL 220 FEET OF 2 INCH POLY ALONG 32ND AVENUE AND ABANDON 400 FEET
OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
3404 080.70894 23,070
RELOCATE FACILITIES. INSTALL 5803 FEET OF 16 INCH STEEL LINE 01-1 AND
ABANDON 4083 FEET OF 6 INCH STEEL TO ACCOMMODATE PRIVATE
DEVELOPMENT PROJECT. ALL CUSTOMERS LANCASTER
RELOCATION OF
FACILITIES DECEMBER
MTX Additions
Page 105 of 178
324
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3405 080.70897 26,916
RELOCATE FACILITIES. INSTALL 1512 FEET OF 6 INCH POLY ALONG NORTH JOE
WILSON ROAD AND ABANDON 1346 FEET OF 6 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL
RELOCATION OF
FACILITIES OCTOBER
3406 080.70899 26,572
RELOCATE FACILITIES. INSTALL 1650 FEET OF 2 INCH POLY AND ABANDON 1650
FEET OF 2 INCH STEEL ALONG MELODY LANE TO ACCOMMODATE CITY PROJECT
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3407 080.70903 8,119
INSTALL DISTRICT REGULATOR STATION 013 ALONG HOWARD STREET AND
ABANDON DISTRICT REGULATOR STATION 013 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3408 080.70907 857
INSTALL 3395 FEET OF 4 INCH AND 150 FEET F 2 INCH POLY ALONG STREETS OF
ROLLING MEADOWS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LANCASTER GROWTH SEPTEMBER
3409 080.70914 340,979
INSTALL 2,600 FEET OF 6 INCH AND 3,725 FEET OF 2 INCH POLY ALONG THE
STREETS OF PARKSIDE NORTH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MIDLOTHIAN GROWTH SEPTEMBER
3410 080.70923 10,714
INSTALL AND REPLACE 1 DISTRICT REGULATOR STATION IN FORT WORTH IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
3411 080.70926 4,975
INSTALL AND REPLACE 1 DISTRICT REGULATOR STATION IN FORT WORTH IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3412 080.70927 87,231
ABANDON DISTRICT REGULATOR STATION 105 IN FORT WORTH IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3413 080.70935 65,754
INSTALL WELD OVER SLEEVE ALONG LINE D AT 635 AND DENTON DRIVE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3414 080.70936 11,279
RELOCATE FACILITIES. INSTALL 700 FEET OF 6 INCH POLY AND 132 FEET OF 12
INCH POLY AND 70 FEET OF 2 INCH POLY AND ABANDON 639 FEET OF 6 INCH POLY
AND 80 FEET OF 12 INCH STEEL ALONG OAK GROVE ROAD TO ACCOMMODATE
THE CITY OF FORT WORTH DRAINGE PROJECT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3415 080.70938 337,885
INSTALL 3.6 MILES OF 16 INCH STEEL AND ABANDON 3.8 MILES OF 10 INCH STEEL
ALONG D17-4. ALL CUSTOMERS WYLIE
SYSTEM
IMPROVEMENT DECEMBER
3416 080.70949 18,703
RELOCATE FACILITIES. INSTALL 1800 FEET OF 2 INCH POLY ALONG A.W. PERRY
STREET AND ABANDON 1350 FEET OF 2 INCH POLY AND 450 FEET OF 2 INCH STEEL
TO ACCOMMODATE THE CITY OF CARROLLTON IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON
RELOCATION OF
FACILITIES OCTOBER
3417 080.70962 25,774
INSTALL 1400 FEET OF 2 INCH POLY ALONG HOLLEMAN DRIVE AND WELLBORN
ROAD AND ABANDON 1400 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
3418 080.70979 30,997
RELOCATE FACILITIES. INSTALL 1100 FEET OF 6 INCH POLY AND ABANDON 1100
FEET OF 6 INCH POLY ALONG RIVERSIDE DRIVE TO ACCOMMODATE CITY OF FORT
WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3419 080.70981 3
RELOCATE FACILITIES. INSTALL 560 FEET OF 4 INCH POLY AND ABANDON 207
FEET OF 2 INCH STEEL AND 445 FEET OF 4 INCH STEEL ALONG HALF MOON. ALL CUSTOMERS RUNAWAY BAY
RELOCATION OF
FACILITIES JANUARY
3420 080.70984 25,400
RELOCATE FACILITIES. INSTALL 850 FEET OF 8 INCH POLY, 30 FEET OF 6 INCH
POLY, AND 40 FEET OF 12 INCH POLY ALONG HARMON ROAD TO ACCOMMODATE
CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3421 080.70996 229,880
INSTALL 3,590 FEET OF 2 INCH AND 910 FEET OF 6 INCH POLY ALONG THE STREET
OF LEGACY RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH DECEMBER
3422 080.70998 22,958
RELOCATE FACILITIES. INSTALL 628 FEET OF 2 INCH POLY ALONG US-175 AND
ABANDON 628 FEET OF 2 INCH POLY TO ACCOMMODATE A TXDOT ROAD PROJECT
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRANKSTON
RELOCATION OF
FACILITIES OCTOBER
3423 080.70999 14,245
INSTALL 1068 FEET OF 6 INCH, 339 FEET OF 4 INCH AND 206 FEET OF 2 INCH POLY
ALONG STREETS OF CELINA 15. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ALLEN GROWTH MARCH
3424 080.71000 11,816
INSTALL 490 FEET OF 4 INCH POLY AND ABANDON 150 FEET OF 6 INCH CAST IRON,
225 FEET OF 4 INCH CAST IRON, 75 FEET OF 4 INCH STEEL ALONG SUTTER AND
OWASSO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3425 080.71001 607
INSTALL 250 FEET OF 2 INCH POLY ALONG WOODVILLE ROAD AND ABANDON 250
FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
3426 080.71011 52,383
RELOCATE FACILITIES. INSTALL 2240 FEET OF 6 INCH POLY AND 215 FEET OF 4
INCH POLY ALONG SOUTH PIPELINE ROAD AND ABANDON 2180 FEET OF 4 INCH
AND 60 FEET OF 3 INCH STEEL AND 70 FEET OF 4 INCH POLY TO ACCOMMODATE
CITY OF EULESS STREET PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS
RELOCATION OF
FACILITIES OCTOBER
3427 080.71014 4,485
REPLACE DISTRICT REGULATOR STATION 204 WITH 2 INCH PRESSURE
REGULATOR, RELIEF VALVE, AND ABOVE GROUND SENSING LINE IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3428 080.71015 7,289
INSTALL 500 FEET OF 4 INCH POLY ALONG LONDONDERRY DRIVE AND ABANDON
490 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
3429 080.71018 45,061
RELOCATE FACILITIES. INSTALL 3565 FEET OF 4 INCH AND 3285 FEET OF 2 INCH
POLY ALONG GLENN LANE AND MILAS LANE AND ABANDON 6850 FEET OF 2 INCH
POLY TO ACCOMMODATE CITY OF GLENN HEIGHTS ROAD IMPROVEMENT
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GLENN HEIGHTS
RELOCATION OF
FACILITIES OCTOBER
3430 080.71021 7,904
INSTALL 520 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY ALONG WEST
PARKWAY AND ABANDON 377 FEET OF 3 INCH AND 230 FEET OF 2 INCH AND 20
FEET OF 4 INCH STEEL AND 54 FEET OF 4 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER
3431 080.71028 5,622
INSTALL 230 FEET OF 4 INCH POLY ALONG HANNAFORD AND RUCKER ROAD AND
ABANDON 310 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY OCTOBER
3432 080.71030 13,568
REPLACE HIGH PRESSURE SERVICE LINE ON LINE KC (WEST) IN ACCORDANCE
WITH THE RAILAROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
3433 080.71031 177,732
RELOCATE FACILITIES. INSTALL 524 FEET OF 2 INCH POLY AND ABANDON 507
FEET OF 2 INCH STEEL ALONG BATES STREET IN ACCORDANCE TO THE TEXAS
RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY DECEMBER
3434 080.71033 4,163
RELOCATE FACILITIES. INSTALL 3580 FEET OF 4 INCH POLY ALONG OLD HEARNE
ROAD AND ABANDON 1465 FEET OF 4 INCH, 1383 FEET OF 3 INCH AND 98 FEET OF
2 INCH POLY AND 70 FEET OF 2 INCH AND 225 FEET OF 3 INCH STEEL TO
ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES OCTOBER
3435 080.71035 9,965
INSTALL 5425 FEET OF 2 INCH, 3005 FEET OF 4 INCH, AND 2060 FEET OF 6 INCH
POLY ALONG THE STREETS OF PECAN SQUARE. RESIDENTIAL NORTHLAKE GROWTH DECEMBER
3436 080.71039 55,245
RELOCATE FACILITIES. INSTALL 980 FEET OF 8 INCH POLY ALONG PRAIRIE DRIVE
AND ABANDON 975 FEET OF 8 INCH POLY TO ACCOMMODATE TOWN OF PROSPER
STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS PROSPER
RELOCATION OF
FACILITIES OCTOBER
3437 080.71043 771,000
INSTALL 3,600 FEET OF 3 INCH STEEL ALONG LINE U22 IN SEAGOVILLE AND
ABANDON 3,600 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCCAULLEY SYSTEM INTEGRITY DECEMBER
3438 080.71044 7,056
ABANDON 143 FEET OF 4 INCH CAST IRON, 247 FEET OF 4 INCH POLY, 550 FEET OF
3 INCH STEEL AND 30 FEET OF 4 INCH STEEL ALONG AVENUE I IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER
3439 080.71045 19,170 INSTALL 35 FEET OF 4 INCH POLY ALONG GATTIS SCHOOL ROAD.
COMMERCIAL OR
INDUSTRIAL HUTTO GROWTH AUGUST
3440 080.71050 1,788
INSTALL 95 FEET OF 4 INCH POLY ALONG EAST 31ST STREET AND ABANDON 200
FEET OF 2 INCH AND 150 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
3441 080.71070 1,589
INSTALL 150 FEET OF 4 INCH AND 600 FEET OF 2 INCH POLY ALONG STREETS OF
URBAN DISTRICT. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL MESQUITE GROWTH JUNE
MTX Additions
Page 106 of 178
325
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3442 080.71079 6,379
ABANDON 27 FEET OF 3 INCH, 2838 FEET OF 4 INCH AND 326 FEET OF 6 INCH POLY
1216 FEET OF 3 INCH AND 99 FEET OF 4 INCH STEEL ALONG PARKWOOD
BOULEVARD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FRISCO SYSTEM INTEGRITY OCTOBER
3443 080.71081 4,139
INSTALL 500 FEET OF 2 INCH POLY AND ABANDON 100 FEET OF 4 INCH STEEL AND
1200 FEET OF 3 INCH STEEL ALONG EAST BELKNAP STREET AND OAK KNOLL
DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY OCTOBER
3444 080.71082 25,406
INSTALL 380 FEET OF 4 INCH POLY ALONG EMERSON AND PRESTON ROAD AND
ABANDON 380 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY OCTOBER
3445 080.71085 (7,600)
INSTALL 345 FEET OF 4 INCH POLY ALONG TREEPOINT DRIVE. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL ARLINGTON GROWTH JUNE
3446 080.71090 3,502
INSTALL 350 FEET OF 2 INCH POLY ALONG ROSS AVENUE AND LESLIE STREET
AND ABANDON 950 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
3447 080.71091 21,661
INSTALL 985 FEET OF 6 INCH POLY AND 820 FEET OF 2 INCH POLY ALONG BRADY
AVENUE AND 2ND STREET AND ABANDON 295 FEET OF 6 INCH 13 FEET OF 2 INCH
POLY AND 1190 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER
3448 080.71092 412
INSTALL 400 FEET OF 4 INCH POLY ALONG GOLIAD STREET. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL ROCKWALL GROWTH NOVEMBER
3449 080.71095 (140)
INSTALL 2,420 FEET OF 2 INCH, 1,350 FEET OF 4 INCH AND 3,805 FEET OF 6 INCH
POLY ALONG THE STREETS OF AVALON AT ARGYLE PHASE 1. RESIDENTIAL ARGYLE GROWTH MARCH
3450 080.71099 13,846
INSTALL 1260 FEET OF 4 INCH POLY ALONG MOSS STREET AND ABANDON 1747
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILRAOD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND SYSTEM INTEGRITY OCTOBER
3451 080.71100 (86,282)
INSTALL 500 FEET OF 4 INCH STEEL ALONG GREENBELT ROAD AND FORT WORTH
BIOSOLIDS FACILITY. ALL CUSTOMERS FORT WORTH GROWTH SEPTEMBER
3452 080.71102 4,418
INSTALL 290 FEET OF 4 INCH POLY AND ABANDON 290 FEET OF 3 INCH IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE SYSTEM INTEGRITY OCTOBER
3453 080.71105 3,240
INSTALL 280 FEET OF 2 INCH POLY ALONG METCALF ROAD AND ABANDON 280
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY OCTOBER
3454 080.71107 7,950
INSTALL 670 FEET OF 4 INCH POLY ALONG BONHAM STREET AND ABANDON 670
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY OCTOBER
3455 080.71109 36,951
INSTALL 1700 FEET OF 4 INCH POLY ALONG DONOHO STREET AND ABANDON 1415
FEET OF 4 INCH, 415 FEET OF 2 INCH STEEL, 230 FEET OF 4 INCH AND 10 FEET OF
3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CLARKSVILLE SYSTEM INTEGRITY DECEMBER
3456 080.71114 1,372
RELOCATE FACILITIES. INSTALL 175 FEET OF 2 INCH POLY AND ABANDON 160
FEET OF 2 INCH STEEL ALONG NORTH ASH STREET TO ACCOMMODATE CITY OF
SPRINGTOWN STREET PROJECT IN ACCORDANCE TO THE TEXAS RAILROAD
COMMISSION RULE 8.209 ALL CUSTOMERS SPRINGTOWN
RELOCATION OF
FACILITIES OCTOBER
3457 080.71116 13,990
INSTALL (3) LOW PRESSURE VALVES ON ABILENE LOW PRESSURE SYSTEM IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
3458 080.71119 20,769
INSTALL 3,600 FEET OF 2 INCH POLY AND ABANDON 2,481 FEET OF 2 INCH STEEL
AND 1,172 FEET OF 2 INCH POLY ALONG FIRST AT WILLOW AND MAPLE STREETS
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LINDSAY SYSTEM INTEGRITY OCTOBER
3459 080.71121 4,555
RELOCATE FACILITIES. INSTALL 247 FEET OF 4 INCH POLY AND ABANDON 182
FEET OF 4 INCH POLY TO ACCOMMODATE TXDOT ROAD IMPROVEMENT PROJECT
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON
RELOCATION OF
FACILITIES OCTOBER
3460 080.71124 6,798
INSTALL 715 FEET OF 2 INCH POLY ALONG N. SMYTH STREET AND ABANDON 315
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILORAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY OCTOBER
3461 080.71126 87,414
INSTALL 2300 FEET OF 2 INCH POLY ALONG PEGGY LANE AND ABANDON 2300
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
3462 080.71128 267 INSTALL 780 FEET OF 2 INCH POLY ALONG VANGUARD WAY. RESIDENTIAL DALLAS GROWTH MARCH
3463 080.71129 (246,358)
RELOCATE FACILITIES. INSTALL 275 FEET OF 2 INCH, 480 FEET OF 4 INCH, 1000
FEET OF 6 INCH AND 305 FEET OF 8 INCH POLY ALONG SKILLMAN STREET AND
ABANDON 690 FEET OF 2 INCH AND 220 FEET OF 3 INCH POLY AND 1390 FEET OF 4
INCH STEEL TO ACCOMMODATE TXDOT PROJECT. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES JULY
3464 080.71130 63,532
INSTALL 343 FEET OF 4 INCH POLY ALONG OAKMONT DRIVE AND ABANDON 337
FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY OCTOBER
3465 080.71134 18,462
RELOCATE FACILITIES. INSTALL 750 OF 2 INCH POLY ALONG HARLAN STREET AND
ABANDON 750 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
3466 080.71143 14,898
RELOCATE FACILITIES. INSTALL APPROXIMATELY 108 FEET OF 4 INCH POLY
ALONG US 79 TO ACCOMMODATE TXDOT ROAD IMPROVEMENT PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKDALE
RELOCATION OF
FACILITIES OCTOBER
3467 080.71145 7,360
INSTALL 462 FEET OF 6 INCH POLY ALONG WILMETH ROAD AND ABANDON 508
FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF MCKINNEY ROAD PROJECT
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY OCTOBER
3468 080.71148 19,474
INSTALL 1140 FEET OF 2 INCH POLY ALONG ROBINWOOD DRIVE AND GREGORY
DRIVE AND ABANDON 3 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
3469 080.71150 3,601
INSTALL 175 FEET OF 4 INCH POLY ALONG SOUTH 11TH STREET AND ABANDON
175 FEET OF 4 INCH CAST IRON IN ACCRODANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
3470 080.71155 36,007
REPLACE DRS 312 AND INSTALL 1150 FEET OF 2 INCH POLY, 250 FEET OF 4 INCH
POLY AND ABANDON 320 FEET OF 3 INCH POLY, 1610 FEET OF 2 INCH STEEL, 250
FEET OF 3 INCH POLY AND ABANDON DRS IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3471 080.71165 17,837
RELOCATE FACILITIES. INSTALL 212 FEET OF 4 INCH POLY AND ABANDON 200
FEET OF 4 INCH POLY AND 880 FEET OF 2 INCH POLY TO ACCOMMODATE DART
RAIL LINE IN DALLAS COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON
RELOCATION OF
FACILITIES OCTOBER
3472 080.71168 (31,492)
RELOCATE FACILITIES. INSTALL 175 FEET OF 2 INCH POLY ALONG ACCENT DRIVE
AND ABANDON 135 FEET OF 2INCH POLY. ALL CUSTOMERS PLANO SYSTEM INTEGRITY JUNE
3473 080.71170 6,952
RELOCATE FACILITIES. INSTALL 72 FEET OF 2 INCH POLY AND ABANDON 64 FEET
OF POLY ALONG LIDO WAY TO ACCOMMODATE CITY OF DENTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE TO THE TEXAS RAILROAD COMMISSION
RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
3474 080.71172 507
INSTALL 3,395 FEET OF 2 INCH, 2,976 FEET OF 4 INCH AND 838 FEET OF 6 INCH
POLY ALONG THE STREETS OF CLAIRMONT ESTATES. RESIDENTIAL PONDER GROWTH MAY
3475 080.71173 24,487
INSTALL 1550 OF 2 POLY ALONG BIRDWELL STREET AND ABANDON 1500 OF 2 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3476 080.71174 (13,814)
INSTALL 790 FEET OF 4 INCH AND 5 FEET OF 2 INCH POLY AND ABANDON 585 FEET
OF 4 INCH AND 395 FEET OF 2 INCH POLY IN RED BIRD MALL. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
3477 080.71177 1,877,249
RELOCATE FACILITIES. INSTALL 874 FEET OF 2 INCH, 6104 FEET OF 4 INCH AND
2279 FEET OF 6 INCH POLY ALONG HIGHWAY 5 AND ABANDON DISTRICT
REGULATOR STATION #3, 1143 FEET OF 1-1/4 & 2 INCH AND 3308 FEET OF 3 INCH
STEEL AND 432 FEET OF 2 INCH POLY, 1619 FEET OF 3 POLY, 238 FEET OF 4 INCH
POLY AND 1932 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA SYSTEM INTEGRITY DECEMBER
3478 080.71185 8,199
RELOCATE FACILITIES. INSTALL 700 FEET OF 4 INCH POLY ALONG DANIELDALE
ROAD AND ABANDON 1250 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF
DUNCANVILLE ROAD IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 107 of 178
326
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3479 080.71189 8,395
INSTALL 300 FEET OF 4 INCH POLY AND 10 FEET OF 2 INCH POLY ALONG CULVER
STREET ABANDON 300 FEET OF 4 INCH STEEL AND 10 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY OCTOBER
3480 080.71192 11,596
INSTALL 400 FEET OF 4 INCH POLY ALONG WALNUT STREET AND ABANDON 400
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY OCTOBER
3481 080.71211 66,434
INSTALL 1520 FEET OF 4 INCH AND 2310 FEET OF 2 INCH POLY ALONG JOHN MCAIN
ROAD. RESIDENTIAL COLLEYVILLE GROWTH SEPTEMBER
3482 080.71214 11,389
INSTALL 975 FEET OF 4 INCH POLY AND ABANDON 975 FEET OF 3 INCH STEEL
ALONG WEST DIVISION STREET SOUTH OF LILLARD ROAD IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
3483 080.71222 54,442
INSTALL 1.975 FEET OF 2 INCH AND 2,295 FEET OF 4 INCH POLY ALONG THE
STREETS OF SYCAMORE COVE SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HICKORY CREEK GROWTH JUNE
3484 080.71223 5,106
INSTALL 2990 FEET OF 2 INCH POLY ALONG THE STREETS OF SHADOWGLEN
DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANOR GROWTH JUNE
3485 080.71224 42,802
INSTALL 1400 FEET OF 2 INCH POLY AND ABANDON 125 FEET OF 4 INCH STEEL, 292
FEET OF 4 INCH POLY, 211 FEET OF 3 INCH STEEL, 145 FEET OF 2 INCH STEEL, 346
FEET OF 2 INCH POLY, AND 151 FEET OF 2 INCH STEEL AND DISTRICT REGLUATOR
STATION 23 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY DECEMBER
3486 080.71235 305,643
INSTALL 1,466 FEET OF 4 INCH AND 1,973 FEET OF 6 INCH POLY ALONG THE
STREETS OF DENTON HIGH SCHOOL AND KINGS RIDGE SUBDIVISION. ALL CUSTOMERS DENTON GROWTH SEPTEMBER
3487 080.71236 1,047,387
INSTALL 7,223 FEET OF 6 INCH POLY ALONG THE STREETS OF GLENWOOD
MEADOWS SUBDIVISION IN DENTON. ALL CUSTOMERS DENTON GROWTH DECEMBER
3488 080.71237 484
INSTALL 2,310 FEET OF 2 INCH AND 1,208 FEET OF 4 INCH POLY ALONG THE
STREETS OF FALCON PLACE. RESIDENTIAL LAKE DALLAS GROWTH JUNE
3489 080.71238 49
INSTALL 3510 FEET OF 4 INCH POLY ALONG THE STREETS OF HICKORY CREEK
SUBDIVISION. RESIDENTIAL HICKORY CREEK GROWTH MARCH
3490 080.71239 8,109
INSTALL 9,365 FEET OF 2 INCH AND 1,605 FEET OF 6 INCH POLY ALONG THE
STREETS OF TRADITION. RESIDENTIAL FORT WORTH GROWTH JUNE
3491 080.71240 507
INSTALL 3,710 FEET OF 2 INCH AND 895 FEET OF 4 INCH POLY ALONG THE
STREETS OF TRADITION PHASE 1C. RESIDENTIAL JUSTIN GROWTH APRIL
3492 080.71250 15,980
INSTALL 2,950 FEET OF 2 INCH POLY ALONG THE STREETS OF WILDRIDGE PHASE
5B SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL UNINCORPORATED GROWTH APRIL
3493 080.71251 177,189
INSTALL 5,650 FEET OF 2 INCH AND 755 FEET OF 4 INCH POLY ALONG THE
STREETS OF KINGS RIDGE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH JULY
3494 080.71254 13,150
INSTALL 1405 FEET OF 4 INCH AND 3862 FEET OF 2 INCH POLY ALONG THE
STREETS OF SHADOWGLEN SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANOR GROWTH JULY
3495 080.71255 178,373
RELOCATE FACILITIES. INSTALL 1769 FEET OF 20 INCH STEEL AND ABANDON 1759
FEET OF 20 INCH STEEL ALONG IH 635 TO ACCOMODATE TXDOT IH 635
IMPROVEMENTS PROJECT. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES DECEMBER
3496 080.71263 6,998
INSTALL 1088 FEET OF 4 INCH AND 1620 FEET OF 2 INCH POLY ALONG THE
STREETS OF SHADOWGLEN SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANOR GROWTH SEPTEMBER
3497 080.71267 5,265
RELOCATE FACILITIES. INSTALL 80 FEET OF 6 INCH POLY ALONG WOODWARD
AVENUE AND ABANDON 80 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
CLEBURNE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
RELOCATION OF
FACILITIES OCTOBER
3498 080.71271 30,324
INSTALL 2,155 FEET OF 2 INCH, 1,565 FEET OF 4 INCH POLY ALONG THE STREETS
OF COUNTRY CLUB ROAD ESTATES SUBDIVISION IN DENTON. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH DECEMBER
3499 080.71274 17,015
INSTALL 1700 FEET OF 2 INCH POLY ALONG CHURCH STREET AND ABANDON
DISTRICT REGULATOR STATION 06, 1016 FEET OF 3 INCH STEEL, 158 FEET OF 4
INCH STEEL, 65 FEET OF 2 INCH STEEL, 350 FEET OF 4 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LADONIA SYSTEM INTEGRITY OCTOBER
3500 080.71276 111,718 INSTALL 4 INCH STEEL ALONG LINE O28. ALL CUSTOMERS GARLAND
SYSTEM
IMPROVEMENT SEPTEMBER
3501 080.71278 22,609
INSTALL 1750 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 325 FEET
OF 4 INCH STEEL, 810 FEET OF 3 INCH POLY, 605 FEET OF 2 INCH STEEL, 9 FEET
OF 2 INCH POLY AND ABANDON DRS 01 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PECAN GAP SYSTEM INTEGRITY OCTOBER
3502 080.71284 5,543
INSTALL 2600 FEET OF 4 INCH POLY ALONG THE STREETS OF DALLAS.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL DALLAS GROWTH JUNE
3503 080.71285 12,795
REPLACE DISTRICT REGULATOR STATION 11 ALONG ALAMO STREET IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER
3504 080.71294 21,043
INSTALL 2500 FEET OF 2 INCH POLY AND ABANDON 2550 FEET OF 3 INCH POLY
ALONG COLLEGE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
3505 080.71302 7,893
INSTALL 1075 FEET OF 4 INCH AND 350 FEET OF 2 INCH POLY ALONG NORTH
BANKS AND WEST 5TH STREET AND ABANDON 485 FEET OF 2 INCH AND 922 FEET
OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CALDWELL SYSTEM INTEGRITY OCTOBER
3506 080.71303 11,328
INSTALL 600 FEET OF 4 INCH AND 700 FEET OF 2 INCH POLY ALONG NORTH BANKS
STREET AND ABANDON 600 FEET OF 2 INCH COATED STEEL AND 700 FEET OF 2
INCH BARE STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CALDWELL SYSTEM INTEGRITY OCTOBER
3507 080.71304 3,771,293
INSTALL 13,251 FEET OF 12 INCH POLY ALONG HARMON ROAD FROM HERITAGE
TRACE PARKWAY TO GOLDEN TRIANGLE ROAD IN FORT WORTH. ALL CUSTOMERS FORT WORTH
SYSTEM
IMPROVEMENT DECEMBER
3508 080.71305 4,223
RELOCATE FACILITIES. INSTALL 250 FEET OF 6 INCH POLY, 75 FEET OF 2 INCH
POLY AND ABANDON 150 FEET OF 4 INCH STEEL, 90 FEET OF 4 INCH POLY, AND 75
FEET OF 2 INCH STEEL ALONG PROJECT E MAIN STREET AND N HAMPTON ROAD
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY
RELOCATION OF
FACILITIES OCTOBER
3509 080.71313 (5,306) INSTALL 4 INCH SERVICE LINE AND METER ALONG STREETS OF WALMART.
COMMERCIAL OR
INDUSTRIAL SNYDER GROWTH JUNE
3510 080.71314 988
INSTALL 2852 FEET OF 2 INCH POLY ALONG STREETS OF THE MERION AT
MIDTOWN. RESIDENTIAL DALLAS GROWTH JUNE
3511 080.71321 15,910
INSTALL 1,760 FEET OF 2 INCH POLY AND ABANDON 1,460 FEET OF 3 INCH STEEL
ALONG LAMAR AND ACHESON IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER
3512 080.71322 86,423
INSTALL (216) POLY SERVICES AND ABANDON (216) STEEL SERVICES IN SAN
ANGELO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
3513 080.71323 61,876
INSTALL 137 POLY SERVICE LINES AND ABANDON 137 STEEL SERVICE LINES
ALONG THE STREETS OF WACO IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
3514 080.71324 45,574
INSTALL (105) POLY SERVICES AND ABANDON (105) STEEL SERVICES IN VERNON
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER
3515 080.71325 1,045
INSTALL 1602 FEET OF 8 INCH AND 3531 FEET OF 6 INCH POLY ALONG THE
STREETS OF HIGHWAY 380. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FRISCO GROWTH MARCH
3516 080.71329 13,067
REPLACE DISTRICT REGULATOR STATION 208 WITH NEW STATION PIPING,
REGULATOR, RELIEF VALVE, AND ABOVE GROUND SENSING LINE IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3517 080.71332 53,262
REPLACE 99 STEEL SERVICES WITH POLY SERVICES ALONG MAPSHEET IN
DENISON 035 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER
3518 080.71333 37,877
REPLACE 50 STEEL SERVICES WITH POLY SERVICES ALONG MAPSHEET IN
KERRVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER
3519 080.71336 67,498
INSTALL (126) SERVICE LINES AND ABANDON (126) SERVICE LINES IN KERVILLE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 108 of 178
327
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3520 080.71337 8,322
INSTALL 1164 FEET OF 4 INCH AND 2965 FEET OF 2 INCH POLY ALONG THE
STREETS OF SHADOWGLEN SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANOR GROWTH JULY
3521 080.71342 4,637
RELOCATE FACILITIES. INSTALL 115 FEET OF 6 INCH STEEL ALONG JACK WHITE
STREET AND ABANDON 115 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF
TEMPLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
RELOCATION OF
FACILITIES OCTOBER
3522 080.71343 2,501
RELOCATE FACILITIES. INSTALL 290 FEET OF 2 INCH POLY AND ABANDON 230
FEET OF 3 INCH AND 2 INCH STEEL ALONG US75 TO ACCOMMODATE CITY OF
SHERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
RELOCATION OF
FACILITIES OCTOBER
3523 080.71344 9,415
REPLACE DISTRICT REGULATOR STATION 209 WITH NEW STATION PIPING,
REGULATOR, RELIEF VALVE, AND ABOVE GROUND SENSING LINE IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3524 080.71346 8,971
REPLACE DISTRICT REGULATOR STATION 211 IN FORT WORTH AND ABANDON
DISTRICT REGULATOR STATION 211 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3525 080.71348 4,070
INSTALL DISTRICT REGULATOR STATION 213 AND ABANDON DISTRICT REGULATOR
STATION 213 ALONG NW 14TH STREET IN FORT WORTH IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3526 080.71349 6,191
REPLACE DISTRICT REGULATOR STATION 216 WITH STATION PIPING, PRESSURE
REGULATOR, RELIEF VALVE, AND ABOVE GROUND SENSING LINE IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3527 080.71350 5,077
REPLACE DISTRICT REGULATOR STATION 221 WITH STATION PIPING,PRESSURE
REGULATOR, RELIEF VALVE, AND ABOVE GROUND SENSING LINE IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3528 080.71352 6,546
REPLACE DISTRICT REGULATOR STATION 229 WITH STATION PIPING, PRESSURE
REGULATOR, RELIEF VALVE, AND ABOVE GROUND SENSING LINE IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3529 080.71353 88,032
RELOCATE FACILITIES. INSTALL 220 FEET OF 6 INCH, 75 FEET OF 4 INCH POLY
ALONG KIMBALL AVE IN GRAPEVINE AND ABANDON 120 FEET OF 4 INCH STEEL
AND 25 FEET OF 6 INCH POLY. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY AUGUST
3530 080.71359 9,660
INSTALL AND ABANDON DISTRICT REGULATOR STATION 07 AND ABANDON
DISTRICT REGULATOR STATION 16 IN BALLINGER IN ACCORDANCE WITH TEXAS
RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY OCTOBER
3531 080.71365 8,514
RELOCATE FACILITIES. INSTALL 120 FEET OF 4 INCH POLY AND ABANDON 120
FEET OF 4 INCH POLY ALONG BELT LINE ROAD TO ACCOMMODATE CITY OF GRAND
PRAIRIE STREET IMPROVEMENTS IN ACCORDANCE WITH THE RAILROAD
COMMSSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES OCTOBER
3532 080.71367 12,780
INSTALL 1600 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR
STATION 17 ALONG JACKSON STREET. IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA SYSTEM INTEGRITY OCTOBER
3533 080.71368 11,357
INSTALL 2,225 FEET OF 2 INCH POLY AND ABANDON 2,233 FEET OF 2 INCH STEEL,
222 FEET OF 2 INCH POLY, 285 FEET OF 4 INCH STEEL, DISTRICT REGULATOR
STATION 112 ALONG JACQUELINE ROAD IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3534 080.71369 21,032
INSTALL 2350 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY ALONG ROBERTS
STREET AND ABANDON 1919 FEET OF 4 INCH AND 627 FEET OF 3 INCH STEEL AND
VERNON DISTRICT REGLUATOR STATION 18 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER
3535 080.71380 31,752
INSTALL 1695 FEET OF 6 INCH POLY, 1100 FEET OF 4 INCH AND 4564 FEET OF 2
INCH POLY ALONG THE STREETS OF LARKSPUR 11. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH OCTOBER
3536 080.71381 206
INSTALL 350 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY ALONG THE STREETS
OF ALTA 287 TOWNHOMES. DEVELOPER INSTALLED FACILITES. ALL CUSTOMERS KENNEDALE GROWTH OCTOBER
3537 080.71387 474,267
INSTALL 2,750 FEET OF 2 INCH POLY AND ABANDON 2,750 FEET OF 4 INCH STEEL
ALONG THE STREETS OF TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY DECEMBER
3538 080.71388 25,730
INSTALL 800 FEET OF 6 INCH STEEL AND ABANDON 800 FEET OF 6 INCH STEEL
ALONG LINE M6 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS BLOOMING GROVE SYSTEM INTEGRITY OCTOBER
3539 080.71389 3,631
INSTALL AND REPLACE 1 DISTRICT REGULATOR STATION 109 IN FORT WORTH IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3540 080.71390 4
INSTALL 2360 FEET OF 2 INCH POLY ALONG STREETS OF WILLIAMS CREEK.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH JANUARY
3541 080.71391 8,766
INSTALL 1,500 FEET OF 2 INCH POLY AND ABANDON 290 FEET OF 2 INCH STEEL,
278 FEET 4 INCH STEEL AND 831 FEET OF 4 INCH POLY ALONG EAST MAGINNIS
STREET. IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHICO SYSTEM INTEGRITY OCTOBER
3542 080.71393 3,447
RELOCATE FACILITIES. INSTALL 36 FEET OF 6 INCH POLY ALONG PRESTON ROAD
AND ABANDON 36 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FRISCO
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
RELOCATION OF
FACILITIES OCTOBER
3543 080.71395 13,360
INSTALL 1,400 FEET OF 2 INCH POLY ALONG EAST MCKINNEY STREET AND
ABANDON 272 FEET OF 3 INCH POLY AND 375 FEET OF 3 INCH STEEL AND 465
FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS PILOT POINT SYSTEM INTEGRITY OCTOBER
3544 080.71397 13,903
RELOCATE FACILITES. INSTALL 1150 FEET OF 2 INCH POLY ALONG COLONIAL
AVENUE AND ABANDON 940 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
3545 080.71401 641
INSTALL 5700 FEET OF 2 INCH POLY AND 1780 FEET OF 4 INCH POLY ALONG THE
STREETS OF CREEKSIDE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH APRIL
3546 080.71403 5,734
REPLACE DISTRICT REGLUATOR STATION 128 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3547 080.71408 28,378
INSTALL 4425 FEET OF 2 INCH POLY ALONG OAK MEADOW LANE AND ABANDON
3560 FEET OF 3 INCH POLY, 315 FEET OF 2 INCH POLY AND 995 FEET OF 1.25 INCH
POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL SYSTEM INTEGRITY OCTOBER
3548 080.71412 349,308
INSTALL 5150 FEET OF 4 INCH POLY AND 1709 FEET OF 2 INCH POLY AND
ABANDON 944 FEET OF 6 INCH POLY, 3646 FEET OF 3 INCH POLY, AND 1919 FEET
OF 2 INCH POLY ALONG THUNDERBIRD LANE IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY OCTOBER
3549 080.71416 49,385
INSTALL 3900 FEET OF 6 INCH POLY ALONG BOWSER ROAD AND ABANDON 3900
FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY OCTOBER
3550 080.71417 4,463
INSTALL DISTRICT REGULATOR STATION ALONG STREETS OF FORT WORTH AND
ABANDON DISTRICT REGULATOR STATION 129 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3551 080.71420 1,807
RELOCATE FACILITIES. INSTALL 1 SERVICE ALONG DRUMMOND AND ABANDON
ONE SERVICE TO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
3552 080.71423 9,084
INSTALL 1500 FEET OF 2 INCH POLY AND ABANDON 49 FEET OF 2 INCH POLY AND
2317 FEET OF 2 INCH STEEL AND PUTNAM DISTRICT REGULATOR STATION 05 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PUTNAM SYSTEM INTEGRITY OCTOBER
3553 080.71425 10,710
INSTALL 1650 FEET OF 2 INCH POLY AND ABANDON 947 FEET OF 2 INCH POLY AND
1553 FEET OF 2 INCH STEEL AND PUTNAM DISTRICT REGULATOR STATION 06 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PUTNAM SYSTEM INTEGRITY OCTOBER
3554 080.71426 4,496
INSTALL DISTRIBUTION REGULATOR STATION 133 AND REPLACE EXISTING
STATION IN FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 109 of 178
328
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3555 080.71427 12,673
INSTALL 800 FEET OF 4 INCH POLY ALONG BURLESON STREET AND ABANDON 800
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
3556 080.71429 374,471
RELOCATE FACILIITES. INSTALL 1,078 FEET OF 6 INCH POLY AND 283 FEET OF 10
INCH STEEL AND ABANDON 120 FEET OF 6 INCH, 958 FEET OF 4 INCH POLY AND
110 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WYLIE SYSTEM INTEGRITY SEPTEMBER
3557 080.71431 2,745
INSTALL DISTRICT REGULATOR STATION ALONG STREETS OF FORT WORTH AND
ABANDON DISTRICT REGULATOR STATION 149 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3558 080.71436 933
INSTALL 4081 FEET OF 2 INCH POLY ALONG STREETS OF THE SUBDIVISION WADE
SETTLEMENT PHASE 2. RESIDENTIAL FRISCO GROWTH JUNE
3559 080.71438 18,899
INSTALL APPROXIMATELY 350 FEET OF 2 INCH AND 500 FEET OF 4 INCH POLY
ALONG WEST TEXAS AVENUE AND LAMAR STREET AND ABANDON
APPROXIMATELY 1000 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OFTEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER
3560 080.71442 42,504
RELOCATE FACILITIES. INSTALL 1820 FEET OF 2 INCH POLY AND ABANDON 1050
FEET OF 2 INCH STEEL, 630 FEET OF 2 INCH POLY, 120 FEET OF 2 INCH STEEL
ALONG BENTON AVENUE AND WINDOWMERE STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3561 080.71443 6,388
INSTALL 630 FEET OF 4 INCH POLY AND ABANDON 550 FEET OF 4 INCH STEEL AND
80 FEET OF 4 INCH POLY ALONG CASH AND TEXOWA IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY OCTOBER
3562 080.71445 1,287
ABANDON DISTRICT REGULATOR STATION #066 IN DALLAS, DALLAS COUNTY AS
PART OF THE AREA REPLACEMENT PROJECT AR ID#3006.1 IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3563 080.71449 5,279
RELOCATE FAILITIES. INSTALL 450 FEET OF 2 INCH POLY, 450 FEET OF 2 INCH
STEEL ALONG BARGER DRIVE AND BOZE STREET TO ACCOMMODATE CITY OF
WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
RELOCATION OF
FACILITIES OCTOBER
3564 080.71460 358,625
INSTALL 8,350 FEET OF 2 INCH AND 2,995 FEET OF 4 INCH POLY ALONG THE
STREETS OF ERICKSON FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL KRUM GROWTH DECEMBER
3565 080.71462 133,391
INSTALL 3445 FEET OF 2 INCH POLY ALONG THE STREETS OF EAGLE CREEK
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH SEPTEMBER
3566 080.71463 200,060
INSTALL 2,595 FEET OF 2 INCH AND 3,180 FEET OF 4 INCH POLY ALONG THE
STREETS OF EAGLE CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH DECEMBER
3567 080.71464 119,430
INSTALL 3,360 FEET OF 2 INCH POLY ALONG THE STREETS OF EAGLE CREEK
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH OCTOBER
3568 080.71467 347,497
INSTALL DISTRICT REGULATOR STATION #237 AND 1,500 FEET OF 4 INCH POLY
AND ABANDON DISTRICT REGULATOR STATION #237, 1,500 FEET OF 4 INCH STEEL
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
3569 080.71471 6,200
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION 155 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3570 080.71478 3
INSTALL 3080 FEET OF 4 INCH POLY ALONG LOOP 567 AT WEATHERFORD
HIGHWAY. ALL CUSTOMERS GRANBURY GROWTH JANUARY
3571 080.71479 28,704
INSTALL 1,440 FEET OF 4 INCH AND 2,100 FEET OF 2 INCH POLY ALONG THE
STREETS OF SANDSTONE ESTATES SUBDIVISION. DEVELOPER INSTALLED
FACILIITES. RESIDENTIAL GRANBURY GROWTH JULY
3572 080.71484 6,585
REPLACE DISTRICT REGULATOR STATION 304 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3573 080.71485 18,197
PURCHASE CP TEST STATIONS AND RETIRE TEST STATION ALONG LINE M11 IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABBOTT SYSTEM INTEGRITY OCTOBER
3574 080.71489 6,133
INSTALL LOW PRESSURE DISTRIBUTION REGULATOR STATION AND ABANDON
DISTRICT REGULATOR STATION IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3575 080.71494 3,033
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION 411 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3576 080.71496 47,133
INSTALL 2900 FEET OF 4 INCH STEEL ALONG LINE R7 AND ABANDON 2900 FEET OF
3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ROWENA SYSTEM INTEGRITY OCTOBER
3577 080.71499 4,740
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION 415 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3578 080.71514 18,263
INSTALL 2688 FEET OF 2 INCH POLY ALONG W BARNETT STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER
3579 080.71516 4,168
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION 402 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3580 080.71517 29,273
RELOCATE FACILITIES. INSTALL 3,750 FEET OF 4 INCH AND 350 FEET OF 2 INCH
POLY ALONG HARD ROCK ROAD AND PIONEER DRIVE AND ABANDON 20 FEET OF 6
INCH POLY, 617 FEET OF 4 INCH STEEL, 1,948 FEET OF 4 INCH POLY, 951 FEET OF 2
INCH STEEL TO ACCOMMODATE THE CITY OF IRVING STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
3581 080.71518 180,496
INSTALL 5,362 FEET OF 2 INCH AND 1,609 FEET OF 4 INCH POLY ALONG THE
STREETS OF THE WILSON CREEK MEADOWS SUBDIVISION. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH DECEMBER
3582 080.71519 153,596
INSTALL 3,351 FEET OF 2 INCH AND 1,754 FEET OF 4 INCH POLY ALONG THE
STREETS OF THE WILSON CREEK MEADOWS SUBDIVISION. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH DECEMBER
3583 080.71521 249,643
INSTALL 4,192 FEET OF 2 INCH, 20 FEET OF 4 INCH, AND 1,558 FEET OF 6 INCH
POLY ALONG THE STREETS OF THE MCKINNEY PAINTED TREE SUBDIVISION. RESIDENTIAL MCKINNEY GROWTH SEPTEMBER
3584 080.71522 349,944
INSTALL DISTRICT REGULATOR STATION 407 AND ABANDON DISTRCT REGULATOR
STATION #407 ALONG THE STREETS OF FORT WORTH IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
3585 080.71523 6,599
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION 410 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3586 080.71527 801
INSTALL 2160 FEET OF 4 INCH POLY AND 4920 FEET OF 2 INCH POLY ALONG THE
STREETS OF WOODCREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FATE GROWTH APRIL
3587 080.71528 24,840
INSTALL DISTRICT REGULATOR STATION 426 IN FORT WORTH AND ABANDON
DISTRICT REGULATOR STATION 426 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3588 080.71529 4,964
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION 503 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3589 080.71530 3,720
RELOCATE FACILITES. INSTALL 25 FEET OF 2 INCH POLY AND ABANDON 25 FEET
OF 2 INCH POLY TO ACCOMMODATE CITY OF MCKINNEY STREET PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES OCTOBER
3590 080.71531 4,687
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION 503 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3591 080.71534 52,280
RELOCATE FACILITIES. INSTALL 1950 FEET OF 4 INCH AND 1715 FEET OF 2 INCH
POLY ALONG SOUTH BROAD STREETAND ABANDON 2640 FEET OF 3 INCH STEEL
1075 FEET OF 3 INCH AND 260 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
CEDAR HILL STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 110 of 178
329
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3592 080.71539 313,883
INSTALL 7500 FEET 6 IN STEEL AND 7500 FEET OF 6 INCH STEEL ALONG FISHTRAP
ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER
3593 080.71540 35,762
INSTALL DISTRICT REGULATOR STATION 506 AND ABANDON DISTRICT REGULATOR
STATION 506 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3594 080.71547 1,446
INSTALL 5535 FEET OF 2 INCH, 165 FEET OF 4 INCH POLY ALONG THE STREETS OF
TRINITY FALLS SUBDIVISION. RESIDENTIAL MCKINNEY GROWTH MARCH
3595 080.71553 14
INSTALL 5105 FEET OF 4 INCH POLY AND 5630 FEET OF 2 INCH POLY ALONG THE
STREETS OF WATERCRESS SUBDIVISION. RESIDENTIAL HASLET GROWTH JANUARY
3596 080.71554 (15) INSTALL 300 FEET OF 2 INCH POLY ALONG TUSCOLA. RESIDENTIAL TUSCOLA GROWTH FEBRUARY
3597 080.71556 3,283
INSTALL 605 FEET OF 4 INCH POLY AND 30 FEET OF 2 INCH POLY ALONG MILLER
ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MELISSA GROWTH DECEMBER
3598 080.71557 80
INSTALL 360 FEET OF 2 INCH POLY ALONG MILLER ROAD. DEVELOPER INSTALLED
FACILITIES.
COMMERCIAL OR
INDUSTRIAL MELISSA GROWTH JULY
3599 080.71560 289,348
INSTALL 3,247 FEET OF 6 INCH POLY ALONG THE STREETS OF ERICKSON FARMS
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS KRUM GROWTH APRIL
3600 080.71563 6,598
INSTALL 2067 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
3601 080.71564 (412)
INSTALL 540 FEET OF 2 INCH POLY ALONG THE STREETS OF VILLAGE PARK
SUBDIVISION. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL BURLESON GROWTH MARCH
3602 080.71567 70,342
RELOCATE FACILITIES. INSTALL 500 FEET OF 4 INCH POLY AND ABANDON 4 INCH
STEEL ALONG DOVE STREET ALL CUSTOMERS SOUTHLAKE
RELOCATION OF
FACILITIES SEPTEMBER
3603 080.71571 416
RELOCATE FACILITIES. INSTALL 625 FEET OF 4 INCH POLY AND ABANDON 375
FEET OF 3 INCH POLY ALONG WEST PARK COURT TO ACCOMMODATE
CONSTRUCTION OF A MEDICAL CENTER. ALL CUSTOMERS EULESS
RELOCATION OF
FACILITIES SEPTEMBER
3604 080.71578 10,225
PURCHASE CAMERAS, MISCELLANEOUS IT, CABLING, SHELVING, AND ACCESS
CONTROL ALONG CHISHOLM TRAIL. ALL CUSTOMERS SYSTEM WIDE STRUCTURES MARCH
3605 080.71579 8,542
ABANDON (10) DISTRICT REGULATOR STATIONS IN DALLAS IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3606 080.71581 841
INSTALL 900 FEET OF 4 INCH AND 500 FEET OF 2 INCH POLY ALONG HIGHTOWER
DRIVE. RESIDENTIAL NORTH RICHLAND HILLS GROWTH APRIL
3607 080.71584 19,838
RELOCATE FACILITIES. INSTALL 280 FEET OF 2 INCH, 137 FEET OF 4 INCH, 349
FEET OF 6 INCH AND 1698 FEET OF 8 INCH POLY ALONG KELLY LANE AND
ABANDON 255 FEET OF 6 INCH, 1706 FEET OF 8 INCH AND 120 FEET OF 4 INCH
POLY TO ACCOMMODATE THE CITY OF PFLUGERVILLE IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PFLUGERVILLE
RELOCATION OF
FACILITIES OCTOBER
3608 080.71585 961
INSTALL 5320 FEET OF 2 INCH, 1272 FEET OF 4 INCH POLY ALONG THE STREETS
OF THE WILLOW WOOD SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH MARCH
3609 080.71588 366
INSTALL 2,629 FEET OF 2 INCH POLY AND 2,061 FEET OF 4 INCH POLY ALONG THE
STREETS OF VENTANA SUBDIVISION. RESIDENTIAL FORT WORTH GROWTH JUNE
3610 080.71589 4,727
REPLACE DISTRICT REGULATOR STATION # 219 IN FORT WORTH AND ABANDON
EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3611 080.71591 3,990
RELOCATE FACILITIES. INSTALL 1080 FEET OF 2 INCH POLY AND ABANDON 965
FEET OF 3 INCH STEEL AND 40 FEET OF 2 INCH POLY ALONG WEST 11TH STREET
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
RELOCATION OF
FACILITIES OCTOBER
3612 080.71592 25,826
RELOCATE FACILITIES. INSTALL 1600 FEET OF 2 INCH AND 125 FEET OF 4 INCH
POLY AND ABANDON 200 FEET OF 2 INCH STEEL AND 180 FEET OF 4 INCH STEEL
AND 40 FEET OF 3 INCH STEEL ALONG BETSY DRIVE AND KARNES DRIVE TO
ACCOMMODATE THE CITY OF ROBINSON DRAINAGE PROJECT IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON
RELOCATION OF
FACILITIES OCTOBER
3613 080.71593 9,139
INSTALL 1,430 FEET OF 43 INCH AND 2,525 FEET OF 2 INCH POLY ALONG THE
STREETS OF LYONS CREST. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GARLAND GROWTH SEPTEMBER
3614 080.71594 239
INSTALL 100 FEET OF 4 INCH AND 2800 FEET OF 2 INCH POLY ALONG THE STREETS
OF BLUEBONNET ESTATES PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ENNIS GROWTH MARCH
3615 080.71600 281,014 INSTALL 3,982 FEET OF 6 INCH POLY ALONG CITY STREET. ALL CUSTOMERS MCKINNEY GROWTH SEPTEMBER
3616 080.71601 4,745
INSTALL 630 FEET OF 4 INCH POLY ALONG WEST CHESTNUT STREET AND SOUTH
ARMSTRONG AVENUE AND ABANDON 167 FEET OF 4 INCH STEEL AND 134 FEET OF
3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER
3617 080.71607 29,110
INSTALL 785 FEET OF 6 INCH POLY, 1430 FEET OF 4 INCH POLY AND 25 FEET OF 2
INCH POLY ALONG S. BROADWAY AND ABANDON 940 FEET OF 2 INCH STEEL AND
855 FEET OF 2 INCH POLY 300 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY OCTOBER
3618 080.71611 160
INSTALL 580 FEET OF 4 INCH POLY ALONG BICKER STREET. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL DALLAS GROWTH MARCH
3619 080.71620 119,997
INSTALL 2,200 FEET OF 4 INCH AND 1,705 FEET OF 2 INCH POLY ALONG THE
STREETS OF WILDCATE RIDGE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GODLEY GROWTH OCTOBER
3620 080.71622 13,462
INSTALL 1200 FEET OF 6 INCH POLY ALONG AMBLER AND ABANDON 765 FEET OF 6
INCH STEEL, 353 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
3621 080.71627 3,139 INSTALL 185 FEET OF 4 INCH STEEL ALONG RENNER DRIVE.
COMMERCIAL OR
INDUSTRIAL RICHARDSON GROWTH DECEMBER
3622 080.71632 11,653
INSTALL 450 FEET OF 4 INCH AND 1871 FEET OF 2 INCH POLY ALONG FURLONG
DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
3623 080.71634 12,540
RELOCATE FACILITIES. INSTALL 1,100 FEET OF 2 INCH POLY AND ABANDON 1,100
FEET OF 2 INCH STEEL ALONG JORDAN DRIVE IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES OCTOBER
3624 080.71635 8,790
INSTALL 1541 FEET OF 4 INCH POLY ALONG THE STREETS OF 3 CORNERS PLAZA
SUBDIVISION. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FRISCO GROWTH APRIL
3625 080.71639 427
INSTALL 556 FEET OF 2 INCH, 2077 FEET OF 6 INCH AND 1190 FEET OF 8 INCH POLY
ALONG PRAIRIE PARKWAY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PROSPER GROWTH MARCH
3626 080.71643 89
INSTALL 365 FEET OF 2 INCH POLY FOR A NEW COMMERCIAL DEVELOPMENT.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL KELLER GROWTH JANUARY
3627 080.71647 20,094
INSTALL 1600 FEET OF 2 INCH POLY ALONG THE ALLEY BETWEEN SPEEDWAY AND
VICTORY AND ABANDON 1306 FEET OF 4 INCH STEEL, 22 FEET OF 3 INCH STEEL,
414 FEET OF 4 INCH POLY AND 7 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3628 080.71648 35,911
INSTALL 1200 FEET OF 2 INCH POLY IN THE ALLEY BETWEEN SPEEDWAY AVENUE
AND ABANDON 1200 FEET OF 4 INCH STEEL AND 33 FEET OF 4 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
3629 080.71649 1 INSTALL 3725 FEET OF 2 INCH POLY ALONG THE STREETS OF SILVER OAKS. RESIDENTIAL MANSFIELD GROWTH JANUARY
3630 080.71654 11,701
INSTALL AND ABANDON DISTRICT REGULATOR STATION 1 IN MORAN IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MORAN SYSTEM INTEGRITY OCTOBER
3631 080.71658 (27)
INSTALL 5224 FEET OF 6 INCH POLY ALONG HIGHWAY 190. DEVELOPER INSTALLED
FACILITIES. ALL CUSTOMERS COPPERAS COVE GROWTH MARCH
3632 080.71659 1
INSTALL 927 FEET OF 4 INCH POLY ALONG CHARLES TILLMAN WAY. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL COPPERAS COVE GROWTH JANUARY
3633 080.71664 17,691
INSTALL 2495 FEET OF 4 INCH POLY ALONG THE ABILENE FIRE TRAINING FACILITY
AND ABANDON 2256 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
3634 080.71665 221,799
INSTALL 7,494 FEET OF 8 INCH POLY ALONG STERLITE STREET. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL ENNIS GROWTH OCTOBER
3635 080.71673 (8)
INSTALL 8 FEET OF 6 INCH STEEL AND ABANDON 8 FEET OF 6 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3636 080.71674 254
RELOCATE FACILITIES. INSTALL 500 FEET OF 4 INCH POLY AND ABANDON 500
FEET OF 4 INCH POLY ALONG STREETS OF EDWARDS CHURCH. DEVELOPER
INSTALLED FACILITIES. ALL CUSTOMERS MESQUITE
RELOCATION OF
FACILITIES JUNE
MTX Additions
Page 111 of 178
330
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3637 080.71679 5,823
RELOCATE FACILITIES. INSTALL 160 FEET OF 4 INCH POLY AND ABANDON 20 FEET
OF 4 INCH POLY AND 120 FEET OF 4 INCH STEEL ALONG THOMAS STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON
RELOCATION OF
FACILITIES OCTOBER
3638 080.71680 284
INSTALL 1400 FEET OF 2 INCH POLY ALONG THE STREETS OF GREENS PRAIRIE
RESERVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH JUNE
3639 080.71684 9,141
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY ALONG EAST OAK
STREET AND ABANDON 80 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
DENTON STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
3640 080.71685 9,363 INSTALL 2920 FEET OF 4 INCH POLY ALONG LIPAN DRIVE. ALL CUSTOMERS LIPAN
SYSTEM
IMPROVEMENT JUNE
3641 080.71687 199,210
INSTALL 4000 FEET OF 6 INCH POLY ALONG HOUSTON STREET. DEVELOPER
INSTALLED FACILITIES. ALL CUSTOMERS ANNA GROWTH SEPTEMBER
3642 080.71688 4,258
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR
STATION 134 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3643 080.71695 288
INSTALL 2075 FEET OF 6 INCH POLY ALONG STREETS OF MERRITT. DEVELOPER
INSTALLED FACILITIES. ALL CUSTOMERS SACHSE GROWTH JULY
3644 080.71700 34,572
INSTALL 3,553 FEET OF 8 INCH, 1,801 FEET OF 6 INCH, 3,814 FEET OF 4 INCH, AND
2,827 FEET OF 2 INCH POLY ALONG THE STREETS OF PARKSIDE ON THE RIVER.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL UNINCORPORATED GROWTH OCTOBER
3645 080.71701 13,119
RELOCATE FACILITIES. INSTALL 860 FEET OF 6 INCH AND 30 FEET OF 2 INCH POLY
ALONG BOSQUE BOULEVARD AND ABANDON 860 FEET OF 6 INCH STEEL AND 30
FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF WACO IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
3646 080.71702 19,237
RELOCATE FACILITIES. INSTALL 2394 FEET OF 4 INCH AND 2 INCH POLY ALONG
PALASOTA DRIVE AND ABANDON 1933 FEET OF 2 INCH POLY AND 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES OCTOBER
3647 080.71703 272,398
RELOCATE FACILITIES.&NBSP; INSTALL 1600 FEET OF 4 INCH AND 345 FEET OF 2
INCH POLY ALONG PALASOTA DRIVE AND ABANDON 1200 FEET OF 3 INCH STEEL
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY JULY
3648 080.71709 2
INSTALL 350 FEET OF 4 INCH POLY ALONG TEXAS HEALTH CENTER FOR WOMEN.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL DENTON GROWTH JANUARY
3649 080.71710 50,274
RELOCATE FACILITIES. INSTALL 1977 FEET OF 2 INCH POLY ALONG GRIFFIN
STREET AND PINE STREET AND ABANDON 1473 FEET OF 2 INCH POLY AND 591
FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF MCKINNEY IMPROVEMENT
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS MCKINNEY
RELOCATION OF
FACILITIES OCTOBER
3650 080.71711 582
INSTALL 1276 FEET OF 8 INCH, 2728 FEET OF 4 INCH AND 6237 FEET OF 2 INCH
POLY ALONG TUFFINO AVENUE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH MARCH
3651 080.71716 1,570,587
INSTALL 4,350 FEET OF 2 INCH, 1,200 FEET OF 4 INCH, 620 FEET OF 6 INCH, AND
400 FEET OF 4 INCH POLY ALONG THE STREET OF HALBERT STREET AND
ABANDON DISTRICT REGULATOR STATION# 429, 2,950 FEET OF 4 INCH 1,615 FEET
OF 3 INCH STEEL, 315 FEET OF 4 INCH, 60 FEET OF 2 INCH AND 1,100 FEET OF 4
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
3652 080.71717 12,616
INSTALL 5,920 FEET OF 2 INCH POLY ALONG THE STREETS OF MAYFIELD FARMS
SUBDIVISION IN ARLINGTON, TARRANT COUNTY. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL ARLINGTON GROWTH DECEMBER
3653 080.71719 52,459
RELOCATE FACILITIES. INSTALL 54 POLY SERVICES AND ABANDON 54 POLY AND
STEEL SERVICES TO ACCOMMODATE ARLINGTON CITY STREET PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES DECEMBER
3654 080.71728 3,115
INSTALL DISTRICT REGULATOR STATION 425 ALONG THE STREETS OF
BRENTWOOD STAIR ROAD AND HOLLOWBROOK COURT AND ABANDON DISTRICT
REGULATOR STATION 425 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3655 080.71733 951
INSTALL 2935 FEET OF 2 INCH AND 1810 FEET OF 4 INCH POLY ALONG THE
STREETS OF THE BRETTON WOODS SUBDIVISION. RESIDENTIAL FRISCO GROWTH DECEMBER
3656 080.71737 25,901
RELOCATE FACILITIES. INSTALL 447 FEET OF 4 INCH POLY ALONG ESTATE LANE
AND ABANDON 422 FEET OF 3 INCH POLY TO ACCOMMODATE TXDOT PROJECT. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES AUGUST
3657 080.71738 51,608
INSTALL 3615 FEET OF 4 INCH AND 550 FEET OF 2 INCH POLY ALONG EDGEWOOD
TERRACE AND ABANDON 3300 FEET OF 4 INCH POLY AND 1060 FEET OF 6 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3658 080.71744 374 INSTALL 200 FEET OF 2 INCH POLY ALONG AIRPORT FREEWAY. ALL CUSTOMERS IRVING GROWTH MARCH
3659 080.71747 2,856
INSTALL 1797 FEET OF 2 INCH POLY ALONG LOST CREEK CIRCLE. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL LONGVIEW GROWTH JUNE
3660 080.71755 (1,974,925)
RELOCATE FACILITIES. INSTALL 399 FEET OF 10 INCH STEEL AND 1996 FEET OF 6
INCH POLY, 159 FT OF 4 INCH POLY AND 145 FEET OF 2 INCH POLY ALONG I-35
RELOCATION AND ABANDON 403 FEET OF 10 INCH STEEL AND 2633 FEET OF POLY
TO ACCOMMODATE TXDOT IMPROVEMENT PROJECT. ALL CUSTOMERS GAINESVILLE
RELOCATION OF
FACILITIES DECEMBER
3661 080.71758 216,980
INSTALL 1,670 FEET OF 4 INCH AND 3,265 FEET OF 2 INCH POLY ALONG THE
STREETS OF WINDRIDGE SUBDIVISION. DEVLEOPER INSTALLED FACILITIES. RESIDENTIAL MIDLOTHIAN GROWTH SEPTEMBER
3662 080.71759 5,797
INSTALL 675 FEET OF 2 INCH AND 1240 FEET OF 4 INCH POLY ALONG STREETS OF
NORTHGATE COMMERCIAL. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL DENTON GROWTH JUNE
3663 080.71760 54,347
RELOCATE FACILITIES. INSTALL 2603 FEET OF 8 INCH, 2891 FEET OF 4 INCH AND
720 FEET OF 2 INCH POLY AND ABANDON 747 FEET OF 8 INCH, 1689 FEET OF 6
INCH, 985 FEET OF 4 INCH, 1404 FEET OF 3 INCH, 107 FEET OF 2 INCH STEEL, 10
FEET OF 4 INCH POLY AND 439 FEET OF 3 INCH POLY ALONG HARBIN STREET TO
ACCOMMODATE THE CITY OF STEPHENVILLE STREET PROJECT IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
RELOCATION OF
FACILITIES OCTOBER
3664 080.71761 25,179
INSTALL 4,140 FEET OF 2 INCH AND 675 FEET OF 6 INCH POLY ALONG THE
STREETS OF CAMBRIDGE BROOK SUBDIVISION IN DENTON, DENTON COUNTY. RESIDENTIAL DENTON GROWTH DECEMBER
3665 080.71762 16,122
INSTALL 2550 FEET OF 2 INCH POLY AND ABANDON 3530 FEET OF 1.25 INCH STEEL
TO ACCOMMODATE ROAD ROW IN THE CITY OF KELLER IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY OCTOBER
3666 080.71763 451,854 INSTALL 3,995 FEET OF 6 INCH POLY ALONG MOCKINGBIRD LANE IN MIDLOTHIAN. ALL CUSTOMERS MIDLOTHIAN GROWTH SEPTEMBER
3667 080.71768 17,814
INSTALL 8 FEET OF 6 INCH STEEL AND ABANDON 8 FEET OF 6 INCH ALONG IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3668 080.71773 802,019
INSTALL 2,140 FEET OF 2 INCH, 1,600 FEET OF 4 INCH, AND 800 FEET OF 6 INCH
POLY ALONG THE STREETS OF 13TH AND 15TH AND ABANDON 1,300 FEET OF 2
INCH, 1,250 FEET OF 4 INCH, 100 FEET OF 3 INCH POLY AND 340 FEET OF 2 INCH,
800 FEET OF 6 INCH, 550 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY DECEMBER
3669 080.71775 815,004 INSTALL 1,862 FEET OF 8 INCH POLY ALONG INDUSTRIAL BOULEVARD. ALL CUSTOMERS CROWLEY GROWTH SEPTEMBER
3670 080.71779 471,040
INSTALL 3,390 FEET OF 6 INCH, 4,417 FEET OF 4 INCH AND 4,267 FEET OF 2 INCH
POLY ALONG THE STREETS OF HUNTERS RIDGE SUBDIVISION. RESIDENTIAL CROWLEY GROWTH JUNE
3671 080.71786 67,591
INSTALL 1,580 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKESIDE
SUBDIVISION. DEVELOPOR INSTALLED FACILITIES. RESIDENTIAL GRAND PRAIRIE GROWTH JUNE
3672 080.71797 (34)
INSTALL 2546 OF 6 INCH AND 465 FEET OF 4 INCH POLY ALONG STREETS OF 46
RANCH COMMERCIAL. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH JANUARY
3673 080.71800 568
INSTALL 1438 FEET OF 8 INCH 2512 FEET OF 4 INCH AND 4171 FEET OF 2 INCH
POLY ALONG THE STREETS OF BAR W RANCH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH MARCH
3674 080.71801 267
INSTALL 2150 FEET OF 2 INCH POLY ALONG THE STREETS OF NEW COLBY
CROSSING SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANSFIELD GROWTH APRIL
MTX Additions
Page 112 of 178
331
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3675 080.71804 (131)
INSTALL 340 FEET OF 6 INCH, 3321 FEET OF 4 INCH AND 1530 FEET OF 2 INCH POLY
ALONG RONALD REAGAN AND KAUFMAN LOOP. DEVELOPER INSTALLED
FACILITIES.
COMMERCIAL OR
INDUSTRIAL LEANDER GROWTH JANUARY
3676 080.71805 370,369
INSTALL 1,480 FEET OF 4 INCH AND 1,020 FEET OF 2 INCH POLY ALONG THE
STREETS OF CHAMBERLAND AVENUE AND ABANDON 400 FEET OF 4 INCH, AND
1,300 FEET OF 2 INCH STEEL AND 800 FEET OF 2 INCH POLY AND DISTRICT
REGULATOR STATION #01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS EMHOUSE SYSTEM INTEGRITY DECEMBER
3677 080.71807 320 INSTALL 1,621 FEET OF 4 INCH POLY ALONG SOFIA PLACE. ALL CUSTOMERS ROUND ROCK GROWTH MARCH
3678 080.71809 2,181
INSTALL ISOLATION VALVE ALONG WEST FRENCH STREET IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER
3679 080.71810 (58)
INSTALL 2167 FEET OF 2 INCH POLY ALONG THE STREETS OF SUN CITY
SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH JANUARY
3680 080.71811 19,598
INSTALL 1,974 FEET OF 6 INCH, 1,162 FEET OF 4 INCH AND 2,603 FEET OF 2 INCH
POLY ALONG THE STREETS OF TRES TIERRA. DEVELOP INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH JUNE
3681 080.71817 16,961
RELOCATE FACILITIES. INSTALL 2470 FEET OF 4 INCH POLY ALONG ONEIL,
WASHINGTON, HUBBARD AND SHANKLE STREETS AND ABANDON 1227 FEET OF 2
INCH STEEL TO ACCOMMODATE CITY OF ALVORD STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALVORD
RELOCATION OF
FACILITIES OCTOBER
3682 080.71819 783
INSTALL 344 FEET OF 6 INCH, 1181 FEET OF 4 INCH AND 2376 FEET OF 2 INCH POLY
ALONG THE STREETS OF SADDLE CREEK SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL GEORGETOWN GROWTH MARCH
3683 080.71823 8,157
RELOCATE FACILITIES. INSTALL 400 FEET OF 2 INCH AND 200 FEET OF 4 INCH
POLY ALONG STAUNTON DRIVE AND SOUTHSIDE DRIVE AND ABANDON 200 FEET
OF 2 INCH POLY, 200 FEET OF 2 INCH AND 200 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES OCTOBER
3684 080.71830 3,652
INSTALL ISOLATION VALVE ALONG NORTH MAIN STREET IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER
3685 080.71832 1,889,019
RELOCATE FACILITIES. INSTALL 4,100 FEET OF 8 INCH POLY ALONG HIGHWAY 287
AND ABANDON 3.060 FEET OF 6 INCH POLY, AND 370 FEET OF 6 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY NOVEMBER
3686 080.71835 22,562
INSTALL 970 FEET OF 2 INCH POLY ALONG THE STREETS OF HERITAGE MEADOWS
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH SEPTEMBER
3687 080.71836 8,348
RELOCATE FACILITIES. INSTALL 850 FEET OF 2 INCH POLY AND ABANDON 840
FEET OF 2 INCH STEEL SERVICES IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
3688 080.71838 5,853
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY ALONG CARROLL
DRIVE AND ABANDON 495 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
3689 080.71839 12,217,075
INSTALL 83,000 FEET (16 MILES) OF 6 INCH, 100 FEET OF 4 INCH, 3,000 FEET OF 2
INCH POLY AND 8 DISTRICT REGULATOR STATIONS ALONG LINE E16 IN PARIS AND
ABANDON 44,455 FEET OF 8 INCH, 42,425 FEET OF 4 INCH, 300 FEET OF 6 INCH, 175
FEET OF 3 INCH STEEL AND 325 FEET OF 8 INCH POLY AND 8 MAIN LINE
REGULATOR STATIONS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY DECEMBER
3690 080.71849 109,535
INSTALL 8 INCH STEEL ALONG LINE K3 AND ABANDON 6,000 FEET OF 3 INCH STEEL
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GODLEY SYSTEM INTEGRITY OCTOBER
3691 080.71850 156,126
REPLACE 5.7 MILES OF 3 INCH STEEL WITH 4 INCH STEEL ALONG LINE L8AE1 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BUFFALO SYSTEM INTEGRITY OCTOBER
3692 080.71852 253,693
INSTALL 1620 FEET OF 8 INCH , 217 FEET OF 6 INCH, 2210 FEET OF 4 INCH AND
9183 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH SEPTEMBER
3693 080.71855 890
INSTALL 615 FEET OF 4 INCH POLY ALONG HIGHWAY 67 AND ABANDON 250 FEET
OF 2 INCH POLY. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JUNE
3694 080.71856 1,161,127
INSTALL 3200 FEET OF 6 INCH, 100 FEET OF 2 INCH POLY AND 3.2 MILES OF 12
INCH STEEL ALONG LINE 028 AND ABANDON 3.2 MILES OF 3.5 INCH STEEL AND
MAIN LINE REGULATOR 42 AND 15 IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT SYSTEM INTEGRITY DECEMBER
3695 080.71857 57,062
INSTALL 750 FEET OF 4 INCH AND 2500 FEET OF 2 INCH POLY ALONG EAST ROYALL
BLVD AND RETIRE 645 FEET OF 6 INCH AND 2230 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MALAKOFF SYSTEM INTEGRITY OCTOBER
3696 080.71865 209,517
INSTALL 1500 FEET OF 16 INCH STEEL AND ABANDON 1500 FEET OF 16 INCH STEEL
ALONG MEACHAM BOLUVARD TO ACCOMODATE HALTOM CITY PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY DECEMBER
3697 080.71869 11
INSTALL 2631 FEET OF 2 INCH AND 948 FEET OF 6 INCH POLY ALONG THE STREETS
OF DEERBROOKE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH MARCH
3698 080.71870 3,503
INSTALL 3450 FEET OF 2 INCH POLY ALONG THE STREETS OF DEEBROOKE
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JUNE
3699 080.71875 4,988
INSTALL 925 FEET OF 2 INCH POLY AND ABANDON 735 FEET OF 2 INCH POLY, 177
FEET OF 2 INCH STEEL ALONG JACKSBORO HWY-DITTO LANE IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3700 080.71878 4,317
INSTALL ISOLATION VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER
3701 080.71882 15,036
INSTALL 1250 FEET OF 2 INCH POLY AND 40 FEET OF 4 INCH POLY ALONG
RANDOLPH STEET AND ABANDON 1290 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER
3702 080.71884 193,831
INSTALL DISTRICT REGULATOR STATION #03 ALONG THE STREETS OF GRANBURY
AND ABANDON DISTRICT REGULATOR STATION #03 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY APRIL
3703 080.71892 3,328,742
INSTALL 1,769 FEET OF 20 INCH STEEL AND ABANDON 1,449 FEET OF 20 INCH
STEEL ALONG LBJ AND MCCREE ROAD TO ACCOMODATE THE TXDOT-DRIVEN
IH635 IMPROVEMENTS PROJECT IN GARLAND, DALLAS COUNTY. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES DECEMBER
3704 080.71894 1,533,888
INSTALL DISTRICT REGULATOR STATION, 2,057 FEET OF 2 INCH, 1,708 FEET OF 4
INCH, 194 FEET OF 6 INCH POLY AND 81 FEET OF 10 INCH, 254 FEET OF 8 INCH,
AND 51 FEET OF 4 INCH STEEL CASING ALONG THE STREET NORTH ALLEY AND
NASH AND ABANDON 2,936 FEET OF 6 INCH, 300 FEET OF 4 INCH, 126 FEET OF 3
INCH, AND 103 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY DECEMBER
3705 080.71900 60,553
RELOCATE FACILITIES. INSTALL 9500 FEET OF 2 INCH POLY AND ABANDON 1500
FEET OF 1 1/4 INCH, 3300 FEET OF 2 INCH, 700 FEET OF 3 INCH, AND 2550 FEET OF
4 INCH POLY ALONG ALMOND DRIVE IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS MANSFIELD
RELOCATION OF
FACILITIES OCTOBER
3706 080.71902 919
INSTALL 1470 FEET OF 2 INCH POLY ALONG HIDDEN VISTA SUBDIVISION.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BURLESON GROWTH JULY
3707 080.71903 20,084
RELOCATE FACILITIES. INSTALL 2600 FEET OF 6 INCH POLY AND 350 FEET OF 2
INCH POLY ALONG STREETS OF ROYSE CITY AND ABANDON 2590 FEET OF 6 INCH
POLY AND 340 FEET OF 2 INCH POLY TO ACCOMMODATE GARLAND STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ROYSE CITY
RELOCATION OF
FACILITIES OCTOBER
3708 080.71905 11,647
INSTALL 1230 FEET OF 2 INCH POLY AND ABANDON 764 FEET 2 INCH STEEL, 438
FEET OF 3 INCH STEEL, 361 FEET OF 2 INCH POLY AND ABANDON DISTRICT
REGULATOR STATION 72 ALONG STURGIS ROAD IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
3709 080.71907 177,725
INSTALL 300 FEET OF 6 INCH POLY ALONG WEST PIPELINE AND CHATEAU VALEE
IN EULESS AND ABANDON 261 FEET OF 6 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 113 of 178
332
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3710 080.71909 168,044
INSTALL 530 FEET OF 6 INCH AND 10 FEET OF 2 INCH POLY ALONG WEST PIPELINE
AND COLUMBUS IN BEDFORD AND ABANDON 516 FEET OF 6 INCH STEEL AND 10
FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BEDFORD SYSTEM INTEGRITY OCTOBER
3711 080.71910 98,343
INSTALL 325 FEET OF 6 INCH, 10 FEET OF 4 INCH POLY ALONG WEST PIPELINE AND
GETTYSBURG IN BEDFORD AND ABANDON 284 FEET OF 6 INCH AND 10 FEET OF 3
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS BEDFORD SYSTEM INTEGRITY DECEMBER
3712 080.71915 2,665
RELOCATE FACILITIES. INSTALL 90 FEET OF 2 INCH POLY AND ABANDON 90 FEET
OF 2 INCH POLY ALONG W BAILEY BOSWELL AND OLD DECATUR TO
ACCOMMODATE CITY OF SAGINAW STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW
RELOCATION OF
FACILITIES OCTOBER
3713 080.71919 12,960
INSTALL 1250 FEET OF 4 INCH POLY AND 1120 FEET OF 2 INCH POLY ALONG
WRIGHT AND ABANDON 875 FEET OF 3 INCH STEEL, 400 FEET OF 2 INCH STEEL
AND 600 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS KERENS SYSTEM INTEGRITY OCTOBER
3714 080.71921 28,539
RELOCATE FACILITIES. INSTALL 1230 FEET OF 2 INCH POLY AND 2015 FEET OF 4
INCH POLY AND ABANDON 2747 FEET OF 2 INCH STEEL ALONG STARK STREET TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3715 080.71922 6,430
INSTALL AND ABANDON DISTRICT REGULATOR STATION 02 IN TRENT IN
ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS TRENT SYSTEM INTEGRITY OCTOBER
3716 080.71923 3,451
RELOCATE FACILITIES. INSTALL 460 FEET OF 2 INCH POLY ALONG BEHRENS ROAD
AND ABANDON 450 FEET 2 INCH POLY TO ACCOMMODATE CITY OF COLLEYVILLE
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
RELOCATION OF
FACILITIES OCTOBER
3717 080.71931 71,286
INSTALL 1100 FEET OF 8 INCH STEEL ALONG LINE L2ND AND ABANDON 1100 FEET
OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY OCTOBER
3718 080.71932 27,923
INSTALL 675 FEET OF 6 INCH AND 520 FEET OF 2 INCH POLY ALONG COLLINS
STREET. DEVELOP INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL ARLINGTON GROWTH SEPTEMBER
3719 080.71933 31,838 INSTALL 7700 FEET OF 8 INCH STEEL ALONG IH35. ALL CUSTOMERS GEORGETOWN
SYSTEM
IMPROVEMENT JULY
3720 080.71937 1,937
INSTALL 4980 FEET OF 2 INCH POLY ALONG THE STREETS OF THE GREENS AT
LEGACY SUBDIVISION. RESIDENTIAL PROSPER GROWTH APRIL
3721 080.71938 288
INSTALL 135 FEET OF 2 INCH AND 245 FEET OF 4 INCH POLY ALONG DENTON
WESTPARK COMMERCIAL. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL DENTON GROWTH JUNE
3722 080.71940 11,285
INSTALL 1,675 FEET OF 2 INCH AND 2,875 FEET OF 4 INCH POLY ALONG THE
STREETS OF WILDRIDGE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL OAK POINT GROWTH APRIL
3723 080.71942 349
INSTALL 3027 FEET OF 2 INCH POLY ALONG THE STREETS OF THE HILLS OF
LEGACY SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PROSPER GROWTH JUNE
3724 080.71943 224,844
INSTALL 16,655 FEET OF 4 INCH STEEL AND ABANDON 16,655 FEET OF 4 INCH
STEEL ALONG THE STREETS OF GAINESVILLE IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS GAINESVILLE SYSTEM INTEGRITY OCTOBER
3725 080.71944 15,504
INSTALL 2300 FEET OF 2 INCH POLY AND ABANDON 2030 FEET OF 2 INCH STEEL
AND 490 FEET OF 3 INCH STEEL ALONG LOOM STREET AND SHUTTLE STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ITASCA SYSTEM INTEGRITY OCTOBER
3726 080.71948 61,702
INSTALL 4500 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR
STATION 323, 2000 FEET OF 4 INCH STEEL AND 2500 FEET OF 4 INCH POLY ALONG
EAST BEKNAP STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULES 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3727 080.71950 11,627
INSTALL 5 FEET OF 8 INCH POLY AND 70 FEET OF 4 INCH POLYE ALONG GLENVILLE
DRIVE AND ABANDON 5 FEET OF 8 INCH AND 60 FEET OF 4 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY OCTOBER
3728 080.71951 111,120
INSTALL 8585 FEET OF 4 INCH STEEL AND ABANDON 8585 FEET OF 4 INCH STEEL
ALONG THE STREETS OF GAINESVILLE IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS MYRA SYSTEM INTEGRITY DECEMBER
3729 080.71952 61,261
RELOCATE FACILITIES. INSTALL 1200 FEET OF 6 INCH AND 120 FEET OF 4 INCH
POLY AND ABANDON 1050 FEET OF 6 INCH AND 100 FEET OF 4 INCH POLY ALONG
CANTRELL SANSOM TO ACCOMMODATE THE CITY OF FORT WORTH
IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULES 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3730 080.71954 (81) INSTALL 20 FEET OF 6 INCH POLY ALONG LAKESIDE PARKWAY. ALL CUSTOMERS COPPELL
SYSTEM
IMPROVEMENT MARCH
3731 080.71955 1,718
INSTALL 250 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION
14 AND 400 FEET OF 4 INCH STEEL AND 280 FEET OF 2 INCH STEEL ALONG
CHAMBERS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER
3732 080.71956 416,827
RELOCATE FACILITIES. INSTALL 156 FEET OF 2 INCH AND 1,616 FEET OF 4 INCH
POLY ALONG COLORADO STREET AND ABANDON 558 FEET OF 2 INCH AND 250
FEET OF 4 INCH POLY AND 416 FEET OF 3 INCH STEEL IN COLLIN COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA SYSTEM INTEGRITY DECEMBER
3733 080.71960 18,420
INSTALL 3025 FEET OF 2 INCH POLY ALONG EAST HARRISON STREET AND
SHERMAN STREET AND ABANDON 100 FEET OF 1.5 INCH STEEL, 747 FEET OF 3
INCH STEEL, 1477 FEET OF 4 INCH STEEL, 37 FEET OF 3 INCH POLY, 100 FEET OF 4
INCH LP POLY AND DISTRICT REGULATOR STATION 02 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA SYSTEM INTEGRITY OCTOBER
3734 080.71962 24,196
INSTALL 450 FEET OF 2 INCH POLY AND 2160 FEET OF 4 INCH POLY ALONG NORTH
CENTRAL STREET AND ABANDON 1999 FEET OF 3 INCH STEEL, 275 FEET OF 3 INCH
POLY AND DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA SYSTEM INTEGRITY DECEMBER
3735 080.71964 66,321 INSTALL 530 FEET OF 2 INCH POLY ALONG COUNTS BOULEVARD RESIDENTIAL DALLAS GROWTH OCTOBER
3736 080.71965 174
REPLACE THE OUTLET RELIEF VALVE ON THE MILES CITY GATE STATION IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILES SYSTEM INTEGRITY OCTOBER
3737 080.71967 5,747
REPLACE DISTRICT REGULATOR STATION #21 IN SNDYER AND ABANDON EXISTING
DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER
3738 080.71968 732
INSTALL 4943 FEET OF 2 INCH POLY ALONG THE STREETS OF THE STAR TRAIL
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PROSPER GROWTH APRIL
3739 080.71969 (51,222)
RELOCATE FACILITIES. INSTALL TWO 6 INCH ISOLATION VALVE, 10 INCH MAINLINE
VALAVE, 80 FEET OF 16 INCH STEEL AND ABANDON 80 FEET OF 16 INCH STEEL
ALONG THE STREETS OF ARLINGTON. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES MAY
3740 080.71971 16,410
RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH POLY AND RETIRE 300 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
3741 080.71975 34,888
INSTALL 400 FEET OF 2 INCH STEEL AND ABANOND 400 FEET OF 2 INCH STEEL
ALONG LINE U9-1 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULES 8.209. ALL CUSTOMERS MUNDAY SYSTEM INTEGRITY OCTOBER
3742 080.71976 14,726
INSTALL 1620 FEET OF 2 INCH POLY AND ABANDON 1581 FEET OF 2 INCH STEEL,
120 FEET 2 INCH STEEL, 166 FEET 2 INCH POLY ALONG WITT STREET AND HATTON
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
3743 080.71978 (16,193)
RELOCATE FACILITES. INSTALL 103 FEET OF 4 INCH POLY AND ABANDON 101 FEET
OF 3 INCH POLY ALONG GALLERIA DRIVE TO ACCOMODATE UNION PACIFIC
RAILROAD EXTENSION PROJECT. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES MARCH
3744 080.71982 435,245
INSTALL 1,407 FEET OF 8 INCH AND 10 FEET OF 2 INCH POLY ALONG MT. ZION
ROAD AND ABANDON 1,330 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY SEPTEMBER
3745 080.71993 204,405
INSTALL 26,498 FEET OF 4 INCH STEEL AND ABANDON 26,498 FEET OF 3 INCH
STEEL ALONG JOE REEVES ROAD IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 114 of 178
333
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3746 080.71995 3,640
INSTALL 350 FEET OF 2 INCH POLY
ALONG WEST RICE AND RETIRE 275 FEET OF 3 INCH CAST IRON AND 90 FEET OF 2
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER
3747 080.71996 288
INSTALL 1,730 FEET OF 4 INCH AND 1830 FEET OF 2 INCH POLY ALONG STREETS
OF SUN WEST ADDITION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WACO GROWTH JUNE
3748 080.71998 16,873
INSTALL 2040 FEET OF POLY ALONG FRANCHER STREET AND ABANDON 2070 FEET
OF STEEL AND DRS19 IN ACCORDANCE WITH TEXAS RAILROAD OF TEXAS RULE
8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
3749 080.71999 1,941,715
INSTALL 3,650 FEET OF 4 INCH, 7,750 FEET OF 2 INCH POLY ALONG DAVIS STREET
IN CLEBURNE AND ABANDON 8,085 FEET OF 4 INCH, 1,540 FEET OF 2 INCH STEEL
AND 520 FEET OF 4 INCH, 825 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY DECEMBER
3750 080.72000 46,139
RELOCATE FACILITIES. INSTALL 2397 FEET OF 6 INCH, 721 FEET OF 2 INCH POLY
AND ABANDON 424 FEET OF 2 INCH, 2278 FEET OF 6 INCH ALONG SOUTH COOPER
STREET TO ACCOMMODATE THE CITY OF ARLINGTION IMPROVEMENT PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
3751 080.72001 662,837
REPLACE DALLAS CENTRAL STATION ALONG THE STREETS OF IRVING IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER
3752 080.72002 7,918
INSTALL 770 FEET OF 4 INCH POLY 110 FEET OF 2 INCH POLY ALONG JACKSON
STREET AND ABANDON 770 FEET OF 4 INCH STEEL AND 110 FEET OF 2 INCH STEEL
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY OCTOBER
3753 080.72011 29,994
RELOCATE FACILITIES. INSTALL 2100 FEET OF 2 INCH POLY AND ABANDON 1285
FEET OF 2 INCH STEEL ALONG REDBUD TO ACCODATE THE CITY OF GARLAND
IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULES 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
3754 080.72012 22,179
RELOCATE FACILITIES. INSTALL 45 FEET OF 2 INCH POLY AND 85 FEET OF 6 INCH
POLY ALONG GARAPAN DRIVE AND ABANDON 45 FEET OF 2 INCH POLY AND 85
FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS STREET PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
3755 080.72014 9 INSTALL 250 FEET OF 2 INCH POLY ALONG WALKER STREET. RESIDENTIAL DENISON GROWTH JANUARY
3756 080.72015 22,067
INSTALL 3425 FEET OF 2 INCH POLY ALONG THE WALNUT HILL LANE AND
KINGSWAY AVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DALLAS GROWTH DECEMBER
3757 080.72019 4,833
INSTALL 144 FEET OF 4 INCH POLY ALONG THE STREETS OF SUNDANCE RETAIL.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL GEORGETOWN GROWTH OCTOBER
3758 080.72035 3,641
INSTALL 1000 FEET OF 2 INCH POLY AND ABANDON 950 FEET OF 2 INCH STEEL
AND DISTRICT REGULATOR STATION 15 ALONG WATERS COURT IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER
3759 080.72036 107,780
INSTALL 750 FEET OF 2 INCH POLY AND 3100 FEET OF 4 INCH POLY AND ABANDON
530 FEET OF 4 INCH POLY, 4765 FEET OF 4 INCH STEEL, 475 FEET OF 6 INCH POLY,
2620 FEET OF 6 INCH STEEL, 40 FEET OF 6 INCH CAST IRON AND 170 FEET OF 8
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3760 080.72039 55,025
RELOCATE FACILITIES. INSTALL 5350 FEET OF 8 INCH, 425 FEET OF 4 INCH, AND
255 FEET OF 2 INCH POLY AND ABANDON 4115 FEET OF 4 INCH STEEL, 1555 FEET
OF 4 INCH, 60 FEET OF 3 INCH, AND 50 FEET OF 2 INCH POLY ALONG CEDAR HILL
SOUTH CLARK TRAIL TO ACCOMMODATE THE CITY OF DESOTO IMPROVEMENT
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES
8.209. ALL CUSTOMERS CEDAR HILL
RELOCATION OF
FACILITIES OCTOBER
3761 080.72044 46,577
INSTALL 300 FEET OF 12 INCH STEEL AND ABANDON 300 FEET OF 12 INCH STEEL
ALONG DUNCAN STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULES 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
3762 080.72045 431,604
INSTALL 300 FEET OF 12 INCH STEEL ALONG UNION STREET AND ABANDON 300
FEET OF 12 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER
3763 080.72048 8,341
INSTALL 40 FEET OF 4 INCH AND 1,590 FEET OF 2 INCH POLY ALONG STREETS OF
SAVOY AND ABANDON 32 FEET OF 3 INCH, 274 FEET OF 2 INCH, 1,400 FEET OF 3
INCH STEEL AND 291 FEET OF 2 INCH POLY, 95 FEET OF 2 INCH STEEL AND
DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS SAVOY SYSTEM INTEGRITY OCTOBER
3764 080.72049 9,208
INSTALL 757 FEET OF 6 INCH POLY AND ABANDON 717 FEET OF 6 INCH POLY
ALONG AIRFIELD DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER
3765 080.72057 3,752
INSTALL DISTRICT REGULATOR STATION 03 AND ABANDON DISTRICT REGULATOR
STATION 03 ALONG THE STREETS OF SOUTHWESTERN ADVENTIST UNIVERSITY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS KEENE SYSTEM INTEGRITY OCTOBER
3766 080.72058 6,123
RELOCATE FACILITIES. INSTALL 385 FEET OF 2 INCH POLY IN EASEMENT BEHIND
211 EAST MAIN STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG
RELOCATION OF
FACILITIES OCTOBER
3767 080.72063 4,299
INSTALL DISTRICT REGULATOR STATION 01 AND ABANDON DISTRICT REGULATOR
STATION 01 ALONG NORTH MAIN STREET IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS JOSHUA SYSTEM INTEGRITY OCTOBER
3768 080.72068 2,130
RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH POLY AND ABANDON 300
FEET OF 2 INCH POLY AT JETER AND JAMESTOWN IN THE CITY OF ENNIS THAT IS
IN CONFLICT WITH A CITY OF ENNIS SEWER PROJECT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
RELOCATION OF
FACILITIES OCTOBER
3769 080.72074 9,047
RELOCATE FACILITIES. INSTALL 277 FEET OF 4 INCH POLY AND 419 FEET OF 6
INCH POLY ALONG JUPITER ROAD AND KINGSLEY ROAD AND ABANDON 1327 FEET
OF 8 INCH STEEL TO ACCOMMODATE TXDOT IMPROVEMENT PROJECT. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES DECEMBER
3770 080.72075 9,146
RELOCATE FACILITIES. INSTALL 510 FEET OF 4 INCH POLY AND RETIRE 500 FEET
OF 4 INCH STEEL AND 115 FEET 2 INCH STEEL ALONG CENTRAL TEXAS PARKWAY
TO ACCOMMODATE CITY OF WACO STREET PROOJECT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
3771 080.72077 2,412
INSTALL 4,550 FEET OF 2 INCH POLY ALONG STREETS OF MAGNOLIA MEADOWS
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GLENN HEIGHTS GROWTH MARCH
3772 080.72078 1,508
RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH POLY AND ABANDON 65 FEET
OF 6 INCH POLY ALONG CESAR CHAVEZ TO ACCOMMODATE A WASTEWATER
CONFLICT FOR THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
3773 080.72082 1,683
RELOCATE FACILITIES. INSTALL 250 FEET OF 2 INCH POLY AND ABANDON 150
FEET OF 2 INCH POLY ALONG PRIVATE DRIVE IN NORTH RICHLAND HILLS, TX. ALL CUSTOMERS NORTH RICHLAND HILLS
RELOCATION OF
FACILITIES APRIL
3774 080.72085 100,309
RELOCATE FACILITIES. INSTALL 922 FEET OF 6 INCH POLY, 3601 FEET OF 4 INCH
POLY AND 597 FEET OF 2 INCH POLY AND ABANDON 2070 FEET OF 6 INCH STEEL,
2390 FEET OF 4 INCH STEEL AND 449 FEET OF 2 INCH STEEL TO ACCOMMODATE
CITY OF IRVING STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
3775 080.72099 24,231
RELOCATE FACILIITES.&NBSP; INSTALL 85 FEET OF 6 INCH POLY ALONG BELTLINE
AND ABANDON 55 FEET OF 6 INCH POLY IN ACCORDDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO SYSTEM INTEGRITY SEPTEMBER
3776 080.72103 96,067 INSTALL ONE (1) 8 INCH TAP ON 12 STEEL ALONG 01 IN LANCASTER. ALL CUSTOMERS WILMER
SYSTEM
IMPROVEMENT OCTOBER
3777 080.72109 66,703
INSTALL 3,950 FEET OF 4 INCH POLY ALONG THE STREETS OF FORT WORTH.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH DECEMBER
3778 080.72111 534
INSTALL 3250 FEET OF 2 INCH POLY AND 3500 FEET OF 8 INCH POLY ALONG THE
STREETS OF OAKMONT SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH APRIL
3779 080.72116 4,323 INSTALL 1083 FEET OF 2 INCH POLY ALONG BELLA CHARCA PARKWAY. RESIDENTIAL NOLANVILLE GROWTH DECEMBER
3780 080.72119 244,915
INSTALL 5,575 FEET OF 2 INCH AND 1,170 FEET OF 4 INCH POLY ALONG THE
STREETS OF COUNTRY CLUB TERRACE SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL DENTON GROWTH DECEMBER
MTX Additions
Page 115 of 178
334
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3781 080.72120 14,419
INSTALL 1530 FEET 2 INCH POLY ALONG TIBBS DRIVE AND ABANDON 1563 FEET
STEEL, DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VALLEY MILLS SYSTEM INTEGRITY OCTOBER
3782 080.72122 43,433
INSTALL 2694 FEET OF 2 INCH POLY AND 4379 FEET OF 4 INCH POLY ALONG
STREETS OF ITALY AND ABANDON 2469 FEET OF 2 INCH STEEL, 4046 FEET OF 3
INCH STEEL, 150 FEET OF 3 INCH POLY, 585 FEET OF 4 INCH STEEL, 815 FEET OF 4
INCH POLY AND DISTRICT REGULATOR STATION 03 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ITALY SYSTEM INTEGRITY OCTOBER
3783 080.72123 22,553
RELOCATE FACILITIES. INSTALL 1902 FEET OF 6 INCH POLY ALONG BONNIE BRAE
AND ABANDON 1007 FEET OF 3 INCH AND 497 FEET OF 4 INCH AND 533 FEET OF 6
INCH POLY TO ACCOMMODATE CITY OF DENTON STREET WIDENING PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES DECEMBER
3784 080.72135 392,994
INSTALL 3,300 FEET OF 6 INCH POLY ALONG THE STREETS OF COUNTRY CLUB
TERRACE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS DENTON GROWTH SEPTEMBER
3785 080.72140 6,056
INSTALL 665 FEET OF 2 INCH POLY AND RETIRE 602 FT OF 4 INCH STEEL IN ALLEY
OF WEST LAMAR STREET IN SHERMAN IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY OCTOBER
3786 080.72141 13,431 INSTALL 3600 FEET OF 4 INCH POLY ALONG BIRDS FORT TRAIL. RESIDENTIAL ARLINGTON GROWTH APRIL
3787 080.72142 (43)
INSTALL 346 FEET OF 2 INCH POLY ALONG THE STREETS OF HORIZON LAKE
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH MARCH
3788 080.72144 52,512
INSTALL 320 FEET OF 4 INCH POLY ALONG 4TH STREET AND ABANDON 320 FEET
OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FRISCO SYSTEM INTEGRITY OCTOBER
3789 080.72145 2,622
INSTALL 430 FEET OF 2 INCH POLY AND ABANDON 1,089 FEET OF 5 INCH BARE
STEEL AND 47 FEET OF 2 INCH IP POLY MAIN IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER
3790 080.72155 4,514
INSTALL 470 FEET OF 2 INCH POLY AND ABANDON 470 FEET OF 2 INCH STEEL
ALONG RIDGETON ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3791 080.72158 42,607
INSTALL 2410 FEET OF 4 INCH AND 1850 FEET OF 2 INCH POLY ALONG KENWOOD
COURT AND ABANDON 2420 FEET OF 6 INCH, 780 FEET OF 4 INCH AND 360 FEET OF
8 INCH STEEL, 700 FEET OF 3 INCH POLY, 400 FEET OF 2 INCH POLY AND 270 FEET
OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
3792 080.72162 4,537
INSTALL 550 FEET OF 4 INCH POLY ALONG WEST 24TH STREET AND ABANDON 550
FEET OF 4 INCH BARE STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
3793 080.72164 13,730
RELOCATE FACILITIES. INSTALL 470 FEET OF 6 INCH POLY ALONG CADIZ STREET
AND ABANDON 400 FEET OF 6 INCH POLY MAIN TO ACCOMODATE CADIZ BRIDGE
RELOCATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
3794 080.72167 250 INSTALLED TWO CASING VENTS ALONG LINE C22. ALL CUSTOMERS IRVING PIPELINE INTEGRITY JANUARY
3795 080.72168 6,074
REPLACE 720 FEET OF POLY ALONG HIGHWAY IN ACCORDANCE WITH THE TEXAS
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY OCTOBER
3796 080.72170 14,243
INSTALL 1450 FEET OF 6 INCH POLY AND 20 FEET OF 2 INCH POLY ALONG 12TH
SOUTHWEST AND ABANDON 1450 FEET OF 6 INCH STEEL AND 15 FEET OF 2 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER
3797 080.72174 1,668
INSTALL 986 FEET OF 8 INCH POLY ALONG COIT ROAD. DEVELOPER INSTALLED
FACILITIES. ALL CUSTOMERS FRISCO GROWTH JUNE
3798 080.72176 2,648
RELOCATE FACILITIES. INSTALL 368 FEET OF 2 INCH POLY ALONG EAST LIVE OAK
STREET AND ABANDON 357 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURNET
RELOCATION OF
FACILITIES OCTOBER
3799 080.72177 7,631
RELOCATE FACILITIES. INSTALL 347 FEET OF 4 INCH POLY AND 258 FEET OF 2
INCH POLY ALONG REES STREET AND ABANDON 35 FEET OF 2 INCH STEEL TO
ACCOMMODATE CITY OF KERRVILLE STREET PROJECT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
RELOCATION OF
FACILITIES OCTOBER
3800 080.72180 15,451
RELOCATE FACILITIES. INSTALL 1120 FEET OF 2 INCH POLY ALONG JANE LANE
AND ABANDON 1110 FEET OF 2 INCH, 50 FEET OF 4 INCH POLY TO ACCOMMODATE
CITY OF WEST IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST
RELOCATION OF
FACILITIES OCTOBER
3801 080.72181 10,642
INSTALL 675 FEET OF 4 INCH AND 384 FEET OF 2 INCH POLY ALONG THE STREETS
OF THE SHOPS AT HIGHLAND VILLAGE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FRISCO GROWTH SEPTEMBER
3802 080.72182 419
INSTALL 2700 FEET OF 6 INCH AND 1300 FEET OF 4 INCH POLY ALONG MILES ROAD
AND STATION BOULEVARD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS SACHSE GROWTH JULY
3803 080.72187 2,008
INSTALL DISTRICT REGULATOR STATION 429 ALONG THE STREETS OF EVERMAN
AND ABANDON DISTRICT REGULATOR STATION 439 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN SYSTEM INTEGRITY OCTOBER
3804 080.72191 5,726
INSTALL NEW HIGH PRESSURE GAS SERVICE LINE AND METER FOR HOLT / CAT
EQUIPMENT SUPPLIER.
COMMERCIAL OR
INDUSTRIAL IRVING GROWTH APRIL
3805 080.72192 1,786
INSTALL 1050 FEET OF 4 INCH AND 450 FEET OF 2 INCH POLY ALONG SOUTH 20TH
STREET.
COMMERCIAL OR
INDUSTRIAL EULESS GROWTH MARCH
3806 080.72195 (17,916)
INSTALL 80 FEET OF 2 INCH POLY FOR THE DALLAS COUNTY OAK CLIFF
GOVERNMENT CENTER.
COMMERCIAL OR
INDUSTRIAL DALLAS GROWTH MARCH
3807 080.72196 2,904
INSTALL 285 FEET OF 2 INCH POLY ALONG PHILLIPS STREET AND 2ND STREET AND
ABANDON 285 FEET OF 2 INCH STEEL IN ACCORDANCE WTH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORMANGEE SYSTEM INTEGRITY OCTOBER
3808 080.72199 (134,687)
INSTALL 3500 FEET OF 2 INCH POLY ALONG TATE STREET AND ABANDON 1850
FEET OF 4 INCH STEEL AND 460 FEET OF 4 INCH, 420 FEET OF 3 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY DECEMBER
3809 080.72202 3,277
INSTALL 300 FEET OF 2 INCH POLY AND ABANDON 300 FEET OF 2 INCH BARE
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY OCTOBER
3810 080.72203 29,552
RELOCATE FACILITIES. INSTALL 2119 FEET OF 6 INCH POLY, 120 FEET OF 4 INCH
POLY AND 171 FEET OF 2 INCH POLY ALONG PIPELINE ROAD AND ABANDON 1760
FEET OF 6 INCH POLY, 164 FEET OF 4 INCH POLY AND 176 FEET OF 2 INCH STEEL
TO ACCOMMODATE CITY OF HURST STREET PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST
RELOCATION OF
FACILITIES DECEMBER
3811 080.72204 4,890
RELOCATE FACILITIES. INSTALL 100 FEET OF 6 INCH POLY ALONG CHISHOLM
HILLS SUBDIVISION OFF OF WOODARD AVENUE TO ACCOMMODATE ROADWAY
CROSSING IN ACCORDACE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CLEBURNE
RELOCATION OF
FACILITIES OCTOBER
3812 080.72207 542
INSTALL 3,868 FEET OF 6 INCH POLY TO SERVE A NEW COMMERCIAL PROJECT
CALLED ASCENDANTS. THIS PROJECT IS LOCATED IN THE CITY OF FORT WORTH,
TARRANT COUNTY, TEXAS. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH JULY
3813 080.72208 604,093
INSTALL 13,112 FEET OF 4 INCH, 4,100 FEET OF 2 INCH POLY ALONG PRAIRIE
CREST LANE IN ARLINGTON. RESIDENTIAL ARLINGTON GROWTH DECEMBER
3814 080.72210 472
INSTALL 4,530 FEET OF 4 INCH AND 1,865 FEET OF 2 INCH POLY ALONG THE
STREETS OF THE RESERVE PHASES 1-3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENISON GROWTH JULY
3815 080.72223 1,083,263
RELOCATE FACIILITIES. INSTALL 1,300 FEET OF 6 INCH AND 200 FEET OF 2 INCH
POLY ALONG SPRING VALLEY ROAD AND LINGCO DRIVE IN RICHARDSON AND
ABANDON 1,300 FEET OF 6 INCH STEEL AND 200 FEET OF 3 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY SEPTEMBER
3816 080.72229 1,579
RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH POLY ALONG STREETS OF
TROPHY CLUB AND ABANDON 115 FEET OF 2 INCH POLY TO ACCOMMODATE
TARRANT COUNTY DRAINAGE PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TROPHY CLUB
RELOCATION OF
FACILITIES OCTOBER
3817 080.72232 3,996 PURCHASE CUTTER AND 6 INCH SHORTSTOP FOR ABILENE DISTRICT. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT JUNE
3818 080.72235 (19,752) INSTALL 450 FEET OF 4 INCH POLY ALONG BELT LINE ROAD.
COMMERCIAL OR
INDUSTRIAL DESOTO GROWTH JUNE
MTX Additions
Page 116 of 178
335
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3819 080.72238 784
INSTALL 360 FEET OF 6 INCH AND 4840 FEET OF 2 INCH POLY ALONG THE STREETS
IF BAR WEST RANCH DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH MARCH
3820 080.72240 91,532
RELOCATE FACILITIES. INSTALL 840 FEET OF 2 INCH, 70 FEET OF 4 INCH AND 1721
FEET OF 6 INCH POLY ALONG FM 89 AND ABANDON 2482 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
RELOCATION OF
FACILITIES DECEMBER
3821 080.72241 3,524
INSTALL 705 FEET OF 2 INCH POLY ALONG THE STREETS OF 15TH STREET
TOWNHOMES. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PLANO GROWTH JUNE
3822 080.72242 9,527
INSTALL 350 FEET OF 4 INCH POLY IN EASEMENT EAST OF MURPHY ROAD TO
SERVE MURPHY MARKETPLACE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL MURPHY GROWTH JUNE
3823 080.72243 322
INSTALL 455 FEET OF 2 INCH POLY ALONG THE STREETS OF 1897 TOWNHOMES IN
PLANO. DEVELOPER INSTALLED FACILITY. RESIDENTIAL PLANO GROWTH OCTOBER
3824 080.72247 86,905 INSTALL 600 FEET OF 4 INCH POLY ALONG E PALM VALLEY.
COMMERCIAL OR
INDUSTRIAL ROUND ROCK GROWTH DECEMBER
3825 080.72248 19,590
RELOCATE FACILITIES. ABANDON 250 FEET OF 3 INCH STEEL ALONG
COMMONWEATH DRIVE TO ACCOMODATE DEVELOPMENT PROJECT. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES JULY
3826 080.72249 (2,545) INSTALL 30 FEET OF 4 INCH POLY ALONG FM 685.
COMMERCIAL OR
INDUSTRIAL PFLUGERVILLE GROWTH JUNE
3827 080.72250 (9,992) INSTALL 140 FEET OF 4 INCH POLY ALONG LOWES BOULEVARD.
COMMERCIAL OR
INDUSTRIAL KILLEEN GROWTH JUNE
3828 080.72251 6,954 INSTALL 75 FEET OF 2 INCH POLY ALONG ASHWOOD LANE. RESIDENTIAL FAIRVIEW GROWTH APRIL
3829 080.72255 4,074
RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY AND ABANDON 700
FEET OF 6 INCH STEEL, AND 200 FEET OF 2 INCH STEEL ALONG 8TH AVENUE AND
PENNSYLVANIA AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3830 080.72259 57 INSTALL 400 FEET OF 2 INCH POLY ALONG ETHRIDGE DRIVE. RESIDENTIAL THE COLONY GROWTH MARCH
3831 080.72266 278,037
INSTALL 42,100 FEET OF 4 INCH STEEL AND ABANDON 42,070 FEET OF 6 INCH
STEEL ALONG LINE O29 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SCURRY SYSTEM INTEGRITY OCTOBER
3832 080.72268 1,475 INSTALL TAP OFF OF LINE O28-2 AT LIBERTY GROVE. ALL CUSTOMERS ROWLETT SYSTEM INTEGRITY APRIL
3833 080.72270 1,053,937
INSTALL 3,100 FEET OF 2 INCH POLY ALONG SPRINGWOOD LANE AND
SPRINGPARK WAY IN PLANO AND ABANDON 3,100 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY DECEMBER
3834 080.72273 8,064
RELOCATE FACILITIES. INSTALL 130 FEET OF 6 INCH POLY ALONG ARAPAHO ROAD
AND ABANDON 130 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
RELOCATION OF
FACILITIES OCTOBER
3835 080.72275 15,710
RELOCATE FACILITIES. INSTALL 860 FEET OF 4 INCH POLY, 20 FEET OF 2 INCH
POLY AND ABANDON 800 FEET OF 4 INCH STEEL, 60 FEET OF 4 INCH POLY, 20 FEET
OF 2 INCH POLY ALONG CULVER AVENUE TO ACCOMMODATE CITY OF FORT
WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
3836 080.72277 3
INSTALL 4000 LINEAR FEET OF 4 INCH IP POLY MAIN AND 400 LINEAR FEET OF 2
INCH POLY MAIN ALONG THE STREETS OF TRADITIONS PHASE 36. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH JANUARY
3837 080.72278 126,290
INSTALL 2000 FEET OF 2 INCH AND 550 FEET OF 4 INCH POLY ALONG LINE C10-5
AND ABANDON 3 MILES OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTH RICHLAND HILLS SYSTEM INTEGRITY DECEMBER
3838 080.72280 205,607
INSTALL 4,450 FEET OF 2 INCH, 1,460 FEET OF 4 INCH POLY ALONG THE STREETS
OF STONERIDGE SUBDIVISION IN MELISSA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH SEPTEMBER
3839 080.72281 578
INSTALL 1200 FEET OF 6 INCH POLY ALONG MAGER LANE. DEVELOPER INSTALLED
FACILITIES. ALL CUSTOMERS HUTTO GROWTH SEPTEMBER
3840 080.72285 426,195
INSTALL 3,055 FEET OF 8 INCH, 3,185 FEET OF 6 INCH, AND 25 FEET OF 4 INCH
POLY ALONG MELISSA ROAD AND TELEPHONE ROAD (CR 277) IN MELISSA.
DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MELISSA GROWTH DECEMBER
3841 080.72289 12,983
INSTALL 660 FEET OF 6 INCH POLY AND ABANDON 660 FEET OF 6 INCH POLY
ALONG WILLIAMS DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER
3842 080.72290 8,783
INSTALL 1200 FEET OF 2 INCH POLY AND ABANDON 127 FEET OF 1.25 INCH POLY,
75 FEET OF 1.25 INCH STEEL, 891 FEET OF 2 INCH POLY, 1062 FEET OF 2 INCH
STEEL AND ABANDON DISTRICT REGULATOR STATION 03 ALONG NORTH
KICKAPOO STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS LIPAN SYSTEM INTEGRITY OCTOBER
3843 080.72292 36,231
INSTALL 3635 FEET OF 2 INCH POLY AND ABANDON 14 FEET OF 1.25 INCH POLY,
1899 FEET OF 2 INCH POLY, 13 FEET OF 1.25 INCH STEEL, 1511 FEET OF 2 INCH
STEEL AND ABANDON DRS04 ALONG STREETS OF LIPAN IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LIPAN SYSTEM INTEGRITY OCTOBER
3844 080.72294 5,156
INSTALL 425 FEET OF 6 INCH POLY AND 465 FEET OF 2 INCH POLY AND ABANDON
425 FEET OF 6 INCH POLY AND 465 FEET OF 2 INCH POLY ALONG WILLIMAS DRIVE
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER
3845 080.72299 10,566
INSTALL 2870 FEET OF 2 INCH POLY ALONG THE STREETS OF WILCO RANCH
SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH SEPTEMBER
3846 080.72300 199
INSTALL 2,550 FEET OF 6 INCH POLY ALONG FM 691. DEVELOPER INSTALLED
FACILITIES. ALL CUSTOMERS DENISON GROWTH JULY
3847 080.72308 3,075
INSTALL 1150 FEET OF 2 INCH POLY ALONG DAWN DRIVE AND ABANDON 1150
FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER
3848 080.72310 6,848
REPLACE DISTRICT REGULATOR STATION #02 IN VENUS AND ABANDON EXISTING
DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VENUS SYSTEM INTEGRITY OCTOBER
3849 080.72311 26,382
INSTALL 2,065 FEET OF 2 INCH AND 1,720 FEET OF 4 INCH POLY ALONG THE
STREETS OF PARKVUE SUBDIVISION. RESIDENTIAL DENTON GROWTH JULY
3850 080.72314 10,094
INSTALL 630 FEET OF 4 INCH POLY ALONG NORTH LINDALE LANE AND ABANDON
630 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY OCTOBER
3851 080.72315 144,766
INSTALL 2440 FEET OF 2 INCH POLY AND 1560 FEET OF 4 INCH POLY ALONG THE
STREETS OF ARROWHEAD FARMS SUBDIVISION. RESIDENTIAL CALDWELL GROWTH JUNE
3852 080.72317 (16)
INSTALL 2,835 FEET OF 2 INCH POLY ALONG THE STREETS OF PRAIRIE OAKS
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL OAK POINT GROWTH MARCH
3853 080.72320 (49,019)
INSTALL 7500 FEET OF 6 INCH POLY ALONG SPRING CREEK PARKWAY AND
ABANDON 7500 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY OCTOBER
3854 080.72321 19,895
INSTALL 1525 FEET OF 2 INCH POLY ALONG STREETS OF RANGER AND ABANDON
173 FEET OF 1.25 INCH STEEL, 67 FEET OF 2 INCH STEEL, 14 FEET OF 3 INCH
STEEL, 29 FEET OF 4 INCH STEEL, 65 FEET OF 2 INCH POLY AND 68 FEET OF 4 INCH
POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER SYSTEM INTEGRITY OCTOBER
3855 080.72322 22,322
INSTALL 1650 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION AND
ABANDON 1221 FEET OF 2 INCH STEEL AND 468 FEET OF 3 INCH STEEL AND
DISTRICT REGULATOR STATION 11 ALONG STREETS OF RANGER IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER SYSTEM INTEGRITY OCTOBER
3856 080.72324 951,657
INSTALL 1,445 FEET OF 6 INCH AND 2,132 FEET OF 8 INCH POLY ALONG THE
STREETS OF JIM CHRISTAL TOAD AND N WESTERN BOULEVARD IN DENTON,
DENTON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER
3857 080.72329 478,082
INSTALL 2700 FEET OF 6 INCH POLY ALONG CUSTER ROAD AND ABANDON 2700
FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY OCTOBER
3858 080.72336 66,877
RELOCATE FACILITIES. INSTALL 750 OF 6 INCH POLY AND AND ABANDON 740 FEET
OF 6 INCH POLY TO ACCOMMODATE SANITARY SEWER LINE. ALL CUSTOMERS HASLET
RELOCATION OF
FACILITIES OCTOBER
3859 080.72338 5,799 INSTALL 100 FEET OF 2 INCH POLY ALONG ARMOR DRIVE. RESIDENTIAL DALLAS GROWTH JULY
MTX Additions
Page 117 of 178
336
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3860 080.72347 358,740
RELOCATE FACILITIES.&NBSP; INSTALL 925 FEET OF 2 INCH AND 300 FEET OF 8
INCH POLY ALONG ECHO BLUFF AND ABANDON 925 FEET OF 2 INCH POLY AND 330
FEET OF 8 INCH STEEL TO ACCOMODATE THE CITY OF DALLAS IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
3861 080.72348 6,986
INSTALL 80 FEET OF 2 INCH POLY AND 100 FEET OF 2 INCH POLY ALONG COUNTY
ROAD 825 AND ABANDON 25 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYLVESTER SYSTEM INTEGRITY OCTOBER
3862 080.72352 6,267
REPLACE REGULATOR AND RELIEF VALVE AT MAIN LINE REGULATOR 01 ON LINE
B15 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AURORA SYSTEM INTEGRITY OCTOBER
3863 080.72353 8,142
INSTALL 1700 FEET OF 2 INCH POLY AND ABANDON 1700 FEET 3 INCH AND 2 INCH
STEEL ALONG STREETS OF PALMER IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALMER SYSTEM INTEGRITY OCTOBER
3864 080.72354 13,128
INSTALL 1300 FEET OF 2 INCH POLY AND ABANDON 22 FEET OF 1.25 INCH POLY,
1280 FEET OF 4 INCH STEEL, 325 FEET OF 2 INCH POLY, 185 FEET OF 4 INCH POLY,
37 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 04 IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ITALY SYSTEM INTEGRITY OCTOBER
3865 080.72364 217 INSTALL 1200 FEET OF 6 INCH POLY ALONG GIFFORD STREET. ALL CUSTOMERS GRAND PRAIRIE GROWTH MARCH
3866 080.72367 10,975
RELOCATE FACILITIES. INSTALL 1948 FEET OF 6 INCH POLY, 75 FEET OF 4 INCH
POLY AND 344 FEET OF 2 INCH POLY AND ABANDON 1527 FEET OF 6 INCH POLY
AND 387 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF COLLEYVILLE STREET
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
RELOCATION OF
FACILITIES DECEMBER
3867 080.72368 20,318
REPLACE 222 STEEL SERVICES WITH POLY SERVICES ON MAPSHEET #021 IN
HILLSBORO IN ACCORDANCE WITH RAILROAD COMMISION RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
3868 080.72369 3,821
RELOCATE FACILITIES. INSTALL 950 FEET OF 4 INCH AND 330 FEET OF 2 INCH
POLY ALONG N COLLEGE STREET AND ABANDON 300 FEET OF 4 INCH, 773 FEET
OF 2 INCH STEEL, 87 FEET OF 4 INCH, 107 FEET OF 2 INCH, AND 445 FEET OF 1.25
INCH POLY TO ACCOMMODATE THE CITY OF WAXAHACHIE DRAINAGE PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
RELOCATION OF
FACILITIES OCTOBER
3869 080.72371 74,917
INSTALL 6788 FEET OF 2 INCH AND 3798 FEET OF 4 INCH POLY ALONG THE
STREETS IF CAMBRIDGE PARK SUBDIVISION. RESIDENTIAL PROSPER GROWTH JULY
3870 080.72372 578,756
INSTALL 3,370 FEET OF 2 INCH POLY ALONG MONTICELLO ROAD IN WAXAHACHIE
AND ABANDON 2,301 FEET OF 2 INCHSTEEL AND 159 FEET OF 3 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY DECEMBER
3871 080.72373 117,916
REPLACE 6000 FEET OF 2 INCH STEEL WITH 4 INCH STEEL ALONG LINE M5 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MAYPEARL SYSTEM INTEGRITY DECEMBER
3872 080.72377 4,194
RELOCATE FACILITIES. INSTALL 125 FEET OF 6 INCH POLY AND 210 FEET OF 1.25
INCH POLY AND ABANDON 125 FEET OF 6 INCH POLY AND 210 FEET OF 2 INCH
POLY ALONG MCNIEL AND MAPLEWOOD TO ACCOMMODATE CITY OF WICHITA
FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
RELOCATION OF
FACILITIES OCTOBER
3873 080.72379 3 INSTALL 240 FEET OF 6 INCH POLY ALONG FM 691.
COMMERCIAL OR
INDUSTRIAL SHERMAN GROWTH JANUARY
3874 080.72380 8,533
INSTALL 820 FEET OF 8 INCH POLY ALONG NORTH MESQUITE CREEK AND
ABANDON 800 FEET OF 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY OCTOBER
3875 080.72385 9,906
INSTALL 1,365 FEET OF 2 INCH POLY AND ABANDON 99 FEET OF 3 INCH POLY, 648
FEET OF 3 INCH STEEL, AND 118 FEET OF 2 INCH STEEL ALONG WENONAH
AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3876 080.72386 6,327
INSTALL 1,430 FEET OF 2 INCH POLY AND ABANDON 602 FEET OF 4 INCH POLY, 504
FEET OF 2 INCH STEEL, AND 13 FEET OF 4 INCH STEEL ALONG INDIAN HEIGHTS
BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3877 080.72387 8,833
INSTALL 1,650 FEET OF 2 INCH POLY AND ABANDON 854 FEET OF 2, 3, AND 4 INCH
POLY, 1204 FEET OF 2 AND 4 INCH STEEL, AND 15 FEET OF 6 INCH STEEL MAIN
ALONG WENONAH IN WICHITA FALLS IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3878 080.72388 3,747
INSTALL 950 FEET OF 2 INCH POLY AND ABANDON 351 FEET OF 4 INCH STEEL, 233
FEET OF 4 INCH POLY, AND 239 FEET OF 2 INCH POLY ALONG CAROL ANN STREET
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3879 080.72389 3,834
INSTALL 1100 FEET OF 2 INCH POLY AND ABANDON 816 FEET OF 4 INCH POLY, 306
FEET OF 4 INCH, AND 378 FEET OF 4 INCH STEEL ALONG BIRCH STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3880 080.72390 128,368
INSTALL 1,000 OF 2 INCH POLY ALONG BEECH STREET AND ABANDON 606 FEET OF
2 INCH AND 879 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
3881 080.72391 258,226
INSTALL 2,300 FEET OF 2 INCH POLY ALONG SEYMOUR AND CHERRY IN WICHITA
FALLS AND ABANDON 663 FEET OF 2 INCH, 341 FEET OF 4 INCH, 463 FEET OF 1.25
INCH STEEL AND 344 FEET OF 4 INCH, 506 FEET OF 2 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3882 080.72392 133,648
INSTALL 1,375 FEET OF 2 INCH POLY AND ABANDON 572 FEET OF 2 INCH, 805 FEET
OF 4 INCH STEEL AND 26 FEET OF 4 INCH POLY ALONG AVE J AND ARTHUR IN
WICHITA FALLS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3883 080.72401 36,503
LINE D9 TO D1 2019 ILI DIGS TO PERFORM CAPITAL REPAIRS IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
3884 080.72403 (90,073)
RELOCATE FACILITIES. INSTALL 320 FEET OF 6 INCH POLY AND ABANDON 320
FEET OF 6 INCH STEEL TO ACCOMMODATE NEW CEFCO. ALL CUSTOMERS PALESTINE
RELOCATION OF
FACILITIES JUNE
3885 080.72408 20,731
INSTALL 312 FEET OF 6 INCH AND 4220 FEET OF 2 INCH POLY ALONG THE STREETS
OF THE RETREAT SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH APRIL
3886 080.72409 445
INSTALL 1,622 FEET OF 2 INCH POLY ALONG THE STREETS OF PARKHAVEN PHASE
2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SHERMAN GROWTH JUNE
3887 080.72412 714
INSTALL 2620 FEET OF 4 INCH POLY ALONG THE STREETS OF WATERS EDGE
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROBINSON GROWTH JULY
3888 080.72413 1,252,251
INSTALL 5,750 FEET OF 4 INCH STEEL, MAIN LINE REGULATOR STATION AND
ABANDON 5,750 FEET OF 2 INCH STEEL, MAIN LINE REGULATOR STATION ALONG
US HWY 77 IN ELLIS COUNTY. IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORRESTON SYSTEM INTEGRITY DECEMBER
3889 080.72415 3,370
RELOCATE FACILITIES. INSTALL 10 SERVICE LINES
ALONG GRIGGS STREET AND ABANDON 10 POLY SERVICES TO ACCOMMODATE
CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
RELOCATION OF
FACILITIES OCTOBER
3890 080.72418 4,133
INSTALL 415 FEET 2 INCH ALONG HALEY AVE AND ABANDON 405 FEET 3 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKDALE SYSTEM INTEGRITY OCTOBER
3891 080.72420 40,380
INSTALL 2257 FEET OF 2 INCH POLY, 840 FEET OF 4 INCH POLY AND ABANDON
3171 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
3892 080.72421 145,945
INSTALL 2717 FEET OF 4 INCH AND 680 FEET OF 2 INCH POLY ALONG STREETS OF
WACO AND ABANDON 2851 FEET OF 4 INCH STEEL AND 425 FEET OF 4 INCH POLY
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
3893 080.72426 13,883
INSTALL 1260 FEET OF 2 INCH POLY AND RETIRE 1260 FEET OF 2 INCH LP STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 118 of 178
337
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3894 080.72431 3,345
RELOCATE FACILTIES. INSTALL 280 FEET OF 6 INCH POLY AND ABANDON 250 FEET
OF 6 INCH POLY TO ACCOMMODATE THE CITY OF FRISCO STREET PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
RELOCATION OF
FACILITIES OCTOBER
3895 080.72437 9,992
INSTALL 2065 FEET OF 2 INCH POLY ALONG COUNTY ROAD 816 AND ABANDON
2410 FEET 2 INCH STEEL AND DISTRICT REGLUATOR STATION IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYLVESTER SYSTEM INTEGRITY OCTOBER
3896 080.72438 367,081
INSTALL 1225 FEET OF 2 INCH AND 1500 FEET OF 4 INCH POLY ALONG THE
STREETS OF WACO AND ABANDON 1225 FEET OF 4 INCH POLY IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
3897 080.72439 1,021,021
INSTALL 1,135 FEET OF 2 INCH AND 1,430 FEET OF 4 INCH POLY ALONG GORMAN
AND MORROW STREETS AND ABANDON 2,401 FEET OF 4 INCH STEEL, 336 FEET OF
4 INCH AND 716 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE OF 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
3898 080.72443 18,676
INSTALL 1300 FEET OF 2 INCH POLY ALONG MARYLAND STREET AND ABANDON
DISTRICT REGLUATOR STATION, 1670 FEET 2 INCH STEEL AND 830 FEET 2 INCH
POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MALAKOFF SYSTEM INTEGRITY OCTOBER
3899 080.72448 27,579
INSTALL 2155 FEET OF 4 INCH POLY AND 645 FEET OF 2 INCH POLY AND ABANDON
2155 FEET OF 4 INCH STEEL AND 645 FEET OF 1.25 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
3900 080.72449 30,302
INSTALL 2150 FEET OF 4 INCH POLY AND 360 FEET OF 2 INCH POLY AND ABANDON
2050 FEET OF 4 INCH STEEL AND 330 FEET OF 2 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
3901 080.72450 33,617
INSTALL 2600 FEET OF 4 INCH POLY AND ABANDON 2402 OF 3 INCH STEEL ALONG
GUTHRIE DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
3902 080.72451 15,831
INSTALL 970 FEET OF 2 INCH POLY ALONG CUBA COURT AND ABANDON 956 FEET
OF 2 INCH STEEL AND 20 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3903 080.72452 131,673
RELOCATE FACILITIES. INSTALL 700 FEET OF 2INCH POLY AND ABANDON 950 FEET
OF STEEL ALONG CHERYL ST IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
3904 080.72461 12,554
RELOCATE FACILITIES. INSTALL 900 FEET OF 4 INCH POLY AND ABANDON 900
FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
3905 080.72463 5,014
INSTALL 125 FEET OF 8 INCH POLY AND ABANDON 115 FEET OF 8 INCH STEEL
ALONG TILDEN STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3906 080.72467 8,464
INSTALL 60 FEET OF 12 POLY AND 230 FEET OF 4 INCH POLY AND ABANDON 12
INCH AND 4 INCH STEEL ALONG SHEPPARD ACCESS IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
3907 080.72470 16,131
RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH POLY AND ABANDON 300
FEET OF 1.25 INCH POLY TO ACCOMMODATE CITY OF COLONY STREET PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THE COLONY
RELOCATION OF
FACILITIES OCTOBER
3908 080.72473 795,211
INSTALL DISTRICT REGULATOR STATION ALONG HALL JOHNSON ROAD AND
ABANDON DISTRICT REGULATOR STATION #05 AND #08. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER
3909 080.72480 (293,122)
RELOCATE FACILITIES. INSTALL 292 FEET OF 4 INCH STEEL AND ABANDON 284
FEET OF 4 INCH STEEL ALONG LINE O29 TO ACCOMMODATE TXDOT PROJECT. ALL CUSTOMERS CRANDALL
RELOCATION OF
FACILITIES AUGUST
3910 080.72490 6,975
INSTALL 950 FEET OF 2 INCH POLY ALONG SOUTH MAIN STREET AND ABANDON
678 FEET OF 2 INCH STEEL AND 482 FEET OF 2 INCH POLY AND DISTRICT
REGLUATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS TRENT SYSTEM INTEGRITY OCTOBER
3911 080.72491 80 INSTALL 450 FEET OF 2 INCH POLY ALONG RECOGNITION POINT DRIVE. ALL CUSTOMERS IRVING GROWTH APRIL
3912 080.72495 9,622
INSTALL 600 FEET OF 2 INCH POLY AND 200 FEET OF 4 INCH POLY ALONG 3RD
STREET AND ABANDON 700 FEET OF 4 INCH AND 100 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM SYSTEM INTEGRITY OCTOBER
3913 080.72497 9,269
INSTALL 642 FEET OF 4 INCH POLY ALONG CLARK STREET AND ABANDON 988
FEET OF 4 INCH STEEL, AND 10 FEET OF 2 INCH STEEL ALONG CLARK STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BARTLETT SYSTEM INTEGRITY OCTOBER
3914 080.72498 12,245
RELOCATE FACILITIES. INSTALL 950 FEET OF 2 INCH POLY ALONG BRADFORD
STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES OCTOBER
3915 080.72499 30,096
INSTALL 975 FEET OF 4 INCH POLY, 1750 FEET OF 2 INCH POLY AND ABANDON
1,525 FEET OF 4 INCH AND 515 FEET OF 2 INCH STEEL ALONG STREETS OF GRAND
PRAIRIE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
3916 080.72500 (153,984)
INSTALL 3.200 FEET OF 12 INCH POLY AND ABANDON 3.200 FEET OF 6 INCH POLY
ALONG W. EVERMAN PKWY. ALL CUSTOMERS FORT WORTH
SYSTEM
IMPROVEMENT DECEMBER
3917 080.72504 11,944
INSTALL 8 INCH STEEL MAIN VALVE AND 4 INCH STEEL STRADDLE VALVE AND
ABANDON 8 INCH MAIN VALVE AND 4 INCH STRADDLE VALVE ALONG AVENUE L IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
3918 080.72505 15,654
RELOCATE FACILITIES. INSTALL 980 FEET OF 4 INCH POLY AND ABANDON 980
FEET OF 3 INCH STEELTO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
3919 080.72508 77
ABANDON 6630 FEET OF 4 INCH STEEL ALONG HUTTO ROAD IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY OCTOBER
3920 080.72512 23,320
INSTALL 300 FEET OF 4 INCH, 2300 FEET OF 2 INCH POLY ALONG WICKER AVE
ALLEYWAY AND ABANDON 300 FEET OF 3 INCH STEEL, 2300 FEET OF 2 INCH POLY
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY OCTOBER
3921 080.72516 370
INSTALL 1360 FEET OF 4 INCH POLY ALONG THE STREETS OF WATERS EDGE
SUBDIVISION. ALL CUSTOMERS ROBINSON GROWTH JULY
3922 080.72517 1,937,434
INSTALL 18,900 FEET OF 8 INCH, 160 FEET OF 6 INCH AND 350 FEET OF 2 INCH
POLY ALONG MONTE CARLO BOULEVARD AND LONGNECK ROAD IN PRINCETON.
DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PRINCETON GROWTH DECEMBER
3923 080.72518 530,025
INSTALL 13,430 FEET OF 2 INCH, 75 FEET OF 4 INCH, 3,425 FEET OF 6 INCH POLY
ALONG THE STREETS OF EASTRIDGE SUBDIVISION IN PRINCETON. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL PRINCETON GROWTH DECEMBER
3924 080.72524 289,802
INSTALL 2600 FEET OF 2 INCH POLY ALONG SOUDER DRIVE AND ABANDON 1377
FEET OF 2 INCH STEEL, 469 FEET OF 4 INCH STEEL AND 706 FEET OF 2 INCH POLY
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.029. ALL CUSTOMERS HURST SYSTEM INTEGRITY OCTOBER
3925 080.72525 359,052
RELOCATE FACILITIES.&NBSP;&NBSP; ISNTALL 2,600 FEET ON 2INCH POLY AND
ABANDON 1,519 FEET OF 2INCH STEEL ALONG HURSTVIEW DRIVE AND 1.058 FEET
OF 2 INCH POLY; IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
3926 080.72526 465,705
RELOCATE FACILITIES.; INSTALL 1,200 FEET OF 2 INCH AND 1,500 FEET OF 6 INCH
POLY ALONG NORTH ARTHUR DRIVE AND ABANDON 1,183 FEET OF 1.25 INCH AND
1,127 FEET OF 2 INCH POLY; 7 FEET OF 1.25 INCH; AND 1,732 FEET OF 4 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY SEPTEMBER
3927 080.72527 311,782
INSTALL 2,550 FEET OF 2 INCH POLY AND ABANDON 2,215 FEET OF 3 INCH STEEL
AND 955 FEET OF 4 INCH STEEL ALONG MYRTLE DRIVE IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
3928 080.72528 322,367
INSTALL 2,570 FEET OF 4 INCH POLY ALONG CULLUM AVENUE AND ABANDON 93
FEET OF 4 INCH POLY, 2,666 FEET OF 4 INCH STEEL, AND 148 FEET OF 3 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 119 of 178
338
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3929 080.72529 572,863
INSTALL 2,935 FEET OF 4 INCH POLY ALONG HENSON DRIVE AND THOMAS AVENUE
AND ABANDON 45 FEET OF 4 INCH POLY AND 2,848 FEET OF 4 INCH STEEL IN
ACCORDANE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
3930 080.72530 698
INSTALL 2600 FEET OF 2 INCH AND 1800 FEET OF 4 INCH POLY ALONG THE
STREETS OF RIDGE RANCH PH 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MESQUITE GROWTH MARCH
3931 080.72533 99,046
RELOCATE FACILITIES.&NBSP; INSTALL 350 FEET OF 2 INCH POLY ALONG 10TH
STREET AND ABANDON 400 FEET OF 2 INCH STEEL AND 350 FEET OF 2 INCH POLY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
3932 080.72534 17,491
INSTALL 388 FEET OF 6 INCH AND 3,082 FEET OF 2 INCH POLY ALONG THE
STREETS OF PARKSIDE ON THE RIVER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER
3933 080.72535 254,249
INSTALL 1,500 FEET OF 2 INCH POLY AND ABANDON 991 FEET OF 2 INCH STEEL
AND 430 FEET OF 3 INCH STEEL ALONG EAST WENONAH BOULEVARD IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
3934 080.72536 264,246
RELOCATE FACILITIES. INSTALL 2,000 FEET OF 2 INCH POLY ALONG WEST
WENONAH BOULEVARD AND ABANDON 1,522 FEET OF 2 INCH STEEL AND 433 FEET
OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY JULY
3935 080.72539 76,702
INSTALL 1825 FEET ON 8 INCH POLY ALONG THE STREETS OF PARKSIDE ON THE
RIVER SUBDISVISION. ALL CUSTOMERS GEORGETOWN GROWTH SEPTEMBER
3936 080.72542 10,188
RELOCATE FACILITIES. INSTALL 945 FEET OF 4 INCH AND 120 FEET 2 INCH POLY
AND ABANDON 375 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF
GRAND PRAIRIE STREET PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES OCTOBER
3937 080.72544 22,126
INSTALL 2750 FEET OF 2 INCH POLY ALONG THE STREETS IF BRENTWOOD
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SAN ANGELO GROWTH SEPTEMBER
3938 080.72545 17,670
RELOCATE FACILITIES. INSTALL 804 FEET OF 4 INCH POLY ALONG FM 2181 AND
ABANDON 285 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES OCTOBER
3939 080.72550 (4,906)
RELOCATE FACILITIES. INSTALL 172 FEET OF 4 INCH POLY AND ABANDON 172
FEET OF 4 INCH POLY ALONG FORD LANE TO ACCOMMODATE AAON. ALL CUSTOMERS LONGVIEW
RELOCATION OF
FACILITIES FEBRUARY
3940 080.72559 411,845
INSTALL 20 FEET OF 6 INCH, 493 FEET OF 4 INCH AND 339 FEET OF 2 INCH POLY
ALONG LEGACY DRIVE SOUTH AND ABANDON 20 FEET OF 6 INCH, 200 FEET OF 4
INCH, 163 FEET OF 3 INCH AND 217 OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO SYSTEM INTEGRITY JUNE
3941 080.72563 (92)
INSTALL 5200 FEET OF 2 INCH POLY ALONG THE STREETS OF RIDGE RANCH
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MESQUITE GROWTH JANUARY
3942 080.72564 5,277 INSTALL 300 FEET OF 2 INCH POLY ALONG RUMFIELD ROAD. RESIDENTIAL NORTH RICHLAND HILLS GROWTH OCTOBER
3943 080.72569 1,247
INSTALL 1423 FEET OF 4 INCH AND 610 FEET OF 2 INCH POLY ALONG THE STREETS
OF ORCHARD RIDGE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH MARCH
3944 080.72572 13,888
INSTALL 1,700 FEET OF 2 INCH POLY, 570 FEET OF 4 INCH POLY AND ABANDON
2,325 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY OCTOBER
3945 080.72576 43
INSTALL 20,500 WMR END POINTS TO COMMERCIAL METERS IN THE DALLAS
METRO. ALL CUSTOMERS DALLAS
SYSTEM
IMPROVEMENT JUNE
3946 080.72577 (47)
INSTALL 1058 FEET OF 4 INCH AND 2196 FEET OF 2 INCH POLY ALONG THE
STREETS OF HORIZON LAKE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH MARCH
3947 080.72580 6,813
INSTALL 2,169 WMR ENDPOINTS ON COMMERCIAL METERS IN THE ROUND ROCK
AREA. ALL CUSTOMERS ROUND ROCK
SYSTEM
IMPROVEMENT JUNE
3948 080.72582 17,447
REPLACE 40 STEEL SERVICES WITH POLY SERVICES ALONG STREETS OF NORTH
WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER
3949 080.72600 3,313
INSTALL 350 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY ALONG NORTH
SWENSON STREET AND ABANDON 350 FEET OF 4 INCH AND 10 FEET OF 2 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY OCTOBER
3950 080.72603 7,186
RELOCATE FACILITIES. INSTALL 345 FEET OF 4 INCH POLY ALONG WEST 3RD
STREET AND ABANDON 345 FEET OF 4 INCH AND 66 FEET OF 2 INCH STEEL TO
ACCOMMODATE CITY OF HEARNE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE
RELOCATION OF
FACILITIES OCTOBER
3951 080.72604 4,288
RELOCATE FACILITIES. INSTALL 30 FEET OF 2 INCH POLY AND ABANDON 20 FEET
OF 2 INCH POLY ALONG GEYSER AVE TO ACCOMMODATE CITY OF PFLUGERVILLE
CITY PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS PFLUGERVILLE
RELOCATION OF
FACILITIES OCTOBER
3952 080.72607 15,569
INSTALL 745 FEET OF 6 INCH AND 10 FEET OF 2 INCH POLY ALONG HAILEY STREET
AND ABANDON 745 FEET OF 6 INCH AND 10 FEET OF 2 INCH BARE STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER
3953 080.72609 151,247
INSTALL 6109 FEET OF 2 INCH, 85 FEET OF 4 INCH AND 904 FEET OF 6 INCH POLY
ALONG THE STREETS OF THE LEXINGTON PARKS SUBDIVISION. RESIDENTIAL FRISCO GROWTH JUNE
3954 080.72610 554
INSTALL 9075 FEET OF 2 INCH POLY ALONG THE STREETS OF VERANDAH
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH DECEMBER
3955 080.72612 614
INSTALL 3435 FEET OF 2 INCH POLY ALONG THE STREETS OF THE GABLES OF
TIOGA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL TIOGA GROWTH MARCH
3956 080.72616 3,317
REPLACE DISTRICT REGULATOR STATION 25 IN CLEBURNE AND INSTALL 80 FEET
OF 4 INCH STEEL AND ABANDON 80 FEET OF 2 INCH STEEL ALONG GRAND
AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER
3957 080.72617 539,310
INSTALL 2,400 FEET OF 2 INCH, 670 FEET OF 6 INCH POLY ALONG THE STREETS OF
ABILENE AND ABANDON 660 FEET OF 3 INCH STEEL AND 331 FEET OF 2 INCH POLY
AND 1,765 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
3958 080.72618 3,380
REPLACE DRS05 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GROESBECK SYSTEM INTEGRITY OCTOBER
3959 080.72621 457,861
INSTALL 8,950 FEET OF 6 INCH POLY ALONG UNIVERSITY DRIVE. DEVELOPER
INSTALLED FACILITIES. ALL CUSTOMERS FORNEY GROWTH DECEMBER
3960 080.72623 16,259
INSTALL 1354 FEET OF 4 INCH, 744 FEET OF 2 INCH POLY AND ABANDON 961 FEET
OF 1.25 INCH STEEL, 177 FEET OF 2 INCH STEEL, 34 FEET OF 2 INCH POLY AND 569
FEET OF 3 INCH POLY MAINS ALONG 845 TIVY STREET IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER
3961 080.72626 100,509 INSTALL PIG TRAP ON PLANO DT-1 IN COLLIN COUNY. ALL CUSTOMERS MCKINNEY PIPELINE INTEGRITY JULY
3962 080.72636 (180,843)
INSTALL 300 FEET OF 4 INCH POLY ALONG THE STREETS OF WOODSPRING SUITES
DEVELOPMENT. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL ROUND ROCK GROWTH JULY
3963 080.72649 513,216
INSTALL 200 FEET OF 2 INCH, 1,470 FEET OF 4 INCH, 1,000 FEET OF 6 INCH POLY
AND ABANDON 216 FEET OF 2 INCH, 1,642 FEET OF 3 INCH, 229 FEET OF 4 INCH
STEEL AND 26 FEET OF 2 INCH, 263 FEET OF 3 INCH AND 334 FEET OF 4 INCH POLY
ALONG THE STREETS OF ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
3964 080.72651 580,526
INSTALL 1,320 FEET OF 4 INCH, 1,450 FEET OF 6 INCH POLY AND ABANDON 632
FEET OF 2 INCH, 1,590 FEET OF 3 INCH STEEL AND 412 FEET OF 3 INCH POLY
ALONG THE STREETS OF ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
3965 080.72653 13,559
INSTALL 83 FEET OF 6 INCH AND 396 FEET OF 4 INCH POLY AND ABANDON 45 FEET
OF 3 INCH STEEL AND 434 FEET INCH OF 2 INCH POLY ALONG MCCLENDON ROAD. ALL CUSTOMERS HEATH
SYSTEM
IMPROVEMENT DECEMBER
3966 080.72654 135,594
INSTALL ACCESS CONTROL, CAMERAS, SIGNAGE, AND CABLING IT FOR FORT
WORTH SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER
3967 080.72655 24,980
INSTALL ACCESS CONTROL, CAMERAS, SIGNAGE, AND CABLING IT FOR HASLET
SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER
3968 080.72656 651,750
INSTALL 2,650 FEET OF 8 INCH POLY ALONG BOIS D ARC AND ABANDON 2,650
FEET OF 3 INCH STEEL. ALL CUSTOMERS HEATH
SYSTEM
IMPROVEMENT SEPTEMBER
MTX Additions
Page 120 of 178
339
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
3969 080.72658 408,212
INSTALL 258 FEET OF 6 INCH POLY ALONG FM2181 NEAR WILDWOOD LANE AND
MIRANDA PLACE IN DENTON AND ABANDON 240 FEET OF 6 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER
3970 080.72659 72 INSTALL 175 FEET OF 2 INCH POLY AONG OAK STREET. RESIDENTIAL FRISCO GROWTH APRIL
3971 080.72663 2,413 INSTALL 2300 FEET OF 4 INCH POLY ALONG SMIRL DRIVE. ALL CUSTOMERS ROCKWALL
SYSTEM
IMPROVEMENT SEPTEMBER
3972 080.72664 260,319 INSTALL 1200 FEET OF 4 INCH POLY ALONG WEST RALPH HALL PARKWAY. ALL CUSTOMERS ROCKWALL
SYSTEM
IMPROVEMENT SEPTEMBER
3973 080.72665 4,621 INSTALL 3400 FEET OF 6 INCH POLY ALONG HORIZON ROAD. ALL CUSTOMERS ROCKWALL
SYSTEM
IMPROVEMENT OCTOBER
3974 080.72675 1,106
INSTALL 1030 FEET OF 4 INCH POLY ALONG BASSWOOD BOULEVARD. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH DECEMBER
3975 080.72678 2,407
RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH POLY ALONG PARKPLACE
AND ABANDON 350 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
RELOCATION OF
FACILITIES OCTOBER
3976 080.72683 1,469
INSTALL 2452 FEET OF 4 INCH AND 6886 FEET OF 2 INCH POLY ALONG THE
STREETS OF WOLF RANCH WEST SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER
3977 080.72687 32,220
INSTALL 50 FEET OF 24 INCH STEEL AND ABANDON 50 FEET OF 24 INCH STEEL
ALONG THE STREETS OF ARLINGTON IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER
3978 080.72691 17,087
INSTALL 4018 FEET OF 2 INCH POLY ALONG THE STREETS OF STAR TRAIL
SUBDIVISION. RESIDENTIAL PROSPER GROWTH JUNE
3979 080.72692 320
INSTALL 950 FEET OF 4 INCH POLY ALONG FORUM DRIVE. DEVELOPER INSTALLED
FACILITIES.
COMMERCIAL OR
INDUSTRIAL ARLINGTON GROWTH APRIL
3980 080.72695 480,121
INSTALL 3660 FEET OF 2 INCH AND 3196 FEET OF 4 INCH POLY ALONG THE
STREETS OF THE TENISON VILLAGE SUBDIVISION. RESIDENTIAL DALLAS GROWTH JUNE
3981 080.72696 2,428,932
INSTALL 4,250 FEET OF 8 INCH, 3,480 FEET OF 4 INCH AND 2,985 FEET OF 2 INCH
POLY ALONG NORTH PEARSON AND ABANDON 4,300 FEET OF 2 INCH, 3,400 FEET
OF 3 INCH AND 1,640 FEET OF 4 INCH STEEL AND 1,075 FEET OF 2 INCH, 1,940 FEET
OF 4 INCH AND 260 FEET OF 8 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GODLEY SYSTEM INTEGRITY DECEMBER
3982 080.72698 (1,561) INSTALL 10 FEET OF 4 INCH POLY ALONG OHIO DRIVE IN COLLIN COUNTY.
COMMERCIAL OR
INDUSTRIAL PLANO GROWTH JUNE
3983 080.72700 1,216,213
RELOCATE FACILITIES.&NBSP; INSTALL REGULATOR STATION AND RETIRE OLD
REGULATOR STATION ALONG FINLEY ROAD DUE TO OBSOLETE COMPONENTS
AND MULTIPLE LEAKS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209 ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER
3984 080.72704 15,949 INSTALL 700 FEET OF 4 INCH POLY ALONG PRECINT LINE ROAD.
COMMERCIAL OR
INDUSTRIAL HURST GROWTH DECEMBER
3985 080.72707 37,446
INSTALL 3,715 FEET OF 6 INCH STEEL IN LAWN TEXAS AND ABANDON 3,715 FEET
OF 6 INCH STEEL ALONG LINE RFB IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS LAWN SYSTEM INTEGRITY OCTOBER
3986 080.72709 23,815
INSTALL 2070 FEET OF 4 INCH POLY ALONG WALNUT STREET AND ABANDON 1860
FEET OF 4 INCH STEEL AND 210 FEET OF 4 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
3987 080.72723 807 INSTALL 1500 FEET OF 6 INCH POLY ALONG HIGHWAY 360. ALL CUSTOMERS ARLINGTON
SYSTEM
IMPROVEMENT MARCH
3988 080.72724 10,356
INSTALL 844 FEET OF 6 INCH AND 8364 FEET OF 2 INCH POLY ALONG THE STREETS
OF SANTA RITA RANCH SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH JULY
3989 080.72726 911,269
RELOCATE FACILITIES. INSTALL 2,340 FEET OF 4 INCH POLY ALONG SOUTH CAMP
WISDOM AND ABANDON 34 FEET OF 4 INCH STEEL, 445 FEET OF 2INCH AND 1,900
FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209 ALL CUSTOMERS DALLAS SYSTEM INTEGRITY NOVEMBER
3990 080.72730 408
INSTALL 907 FEET OF 8 INCH AND 2288 FEET OF 2 INCH POLY ALONG THE STREETS
OF SANTA RITA RANCH DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILLS GROWTH APRIL
3991 080.72737 (23,774) INSTALL 408 FEET OF 2 INCH POLY ALONG AUSTIN LANE IN PROSPER. RESIDENTIAL PROSPER GROWTH MARCH
3992 080.72738 2,281
INSTALL 475 FEET OF 2 INCH POLY AND ABANDON 325 FEET OF 1 INCH, 40 FEET OF
2 INCH STEEL ALONG FLORENCE IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS
UNICORPORATED COUNTY
AREA, (GOODLET) SYSTEM INTEGRITY OCTOBER
3993 080.72741 10,185
INSTALL 1100 FEET OF 4 INCH POLY ALONG WEST LOOP 306 TO SERVE A NEW
COMMERCIAL DEVELOPMENT ON W LOOP 306. DEVELOPER INSTALLED
FACILITIES.
COMMERCIAL OR
INDUSTRIAL SAN ANGELO GROWTH JUNE
3994 080.72742 263,037
INSTALL 666 FEET OF 4 INCH POLY ALONG EAST AUSTIN AVENUE AND NORTH
LAMPASAS STREET AND ABANDON 355 FEET OF 2 INCH POLY AND 298 FEET OF 3
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY DECEMBER
3995 080.72743 16,890
INSTALL 465 FEET OF 2 INCH AND 1377 FEET OF 4 INCH POLY AND ABANDON 455
FEET OF 4 INCH STEEL, 60 FEET OF 4 INCH POLY, 1127 FEET OF 3INCH STEEL AND
200 FEET OF 2 INCH STEEL ALONG EAST WALNUT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
3996 080.72744 (2,814)
INSTALL 4,072 FEET OF 6 INCH AND 1,052 FEET OF 2 INCH POLY ALONG THE
STREETS OF UNIVERSITY HEIGHTS. DEVELOPER NSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
3997 080.72746 13,289 INSTALL 3800 FEET OF 4 INCH POLY ALONG SEETON ROAD NORTH. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM
IMPROVEMENT DECEMBER
3998 080.72747 386,169
INSTALL 3,200 FEET OF 6 INCH, 1900 FEET OF 4 INCH POLY ALONG FM 1777 IN
JOSEPHINE. ALL CUSTOMERS JOSEPHINE GROWTH DECEMBER
3999 080.72751 4,556,970
INSTALL 36,960 FEET OF 4 INCH STEEL ALONG FM 897 IN BOSQUE COUNTY AND
ABANDON 26,960 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE OF 8.209. ALL CUSTOMERS HICO SYSTEM INTEGRITY DECEMBER
4000 080.72752 7,802
RELOCATE FACILITIES. INSTALL 550 FEET OF 2 INCH POLY AND ABANDON 550
FEET OF 2 INCH POLY ALONG 600 BLOCK OF US 75 FRONTAGE ROAD TO
ACCOMMODATE TXDOT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
RELOCATION OF
FACILITIES OCTOBER
4001 080.72756 17,746
INSTALL 500 FEET OF 3 INCH STEEL ALONG LINE KPD1E AND ABANDON APPROX
500 FEET OF 3 INCH STEEL ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DE LEON SYSTEM INTEGRITY OCTOBER
4002 080.72757 5,252
INSTALL 1200 FEET OF 2 INCH POLY AND ABANDON 1437 FEET OF 2 INCH STEEL,
552 FEET OF 1.25 INCH STEEL, AND 121 FEET OF 2 INCH POLY ALONG NEWCOMB
AND GILES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY OCTOBER
4003 080.72758 12,207
INSTALL 1,580 FEET OF 8 INCH, 46 FEET OF 4 INCH AND 7.108 FEET OF 2 INCH POLY
ALONG THE STREETS OF SANTA RITA RANCH EAST SUBDIVISION. DEVELOP
INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH SEPTEMBER
4004 080.72759 411,821
REPLACE 5.25 MILES OF 10 INCH STEEL ALONG LINE KC (WEST) WITH 8 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLYDE SYSTEM INTEGRITY DECEMBER
4005 080.72760 641,115
INSTALL 2,320 FEET OF 4 INCH AND 465 FEET OF 2 INCH POLY ALONG COLLEGE
STREET AND ABANDON 287 FEET OF 3 INCH, 817 FEET OF 4 INCH POLY AND 1,236
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER
4006 080.72762 51,386
INSTALL 2760 FEET OF 2 INCH POLY ALONG DREXEL DRIVE AND ABANDON 134
FEET OF 3 INCH POLY, 31 FEET OF 4 INCH POLY, 664 FEET OF 3 INCH STEEL, 1,483
FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION 07 IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER
4007 080.72763 1,113,304
INSTALL 2,610 FEET OF 4 INCH AND 525 FEET OF 2 INCH POLY ALONG BALL
STREET AND ABANDON 1,941 FEET OF 4 INCH POLY AND 964 FEET OF 2, 4, AND 6
INCH STEEL AND GRAPEVINE DISTRICT REGULATOR STATION #7 IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER
MTX Additions
Page 121 of 178
340
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4008 080.72764 4,019,069
RELOCATE FACILITIES. INSTALL 2,000 FEET OF 12 INCH. 2,500 FEET OF 10 INCH,
1,500 FEET OF 4 INCH STEEL AND 1,000 FEET OF 6 INCH POLY AND NEW HIP TO
DISTRICT REGULATOR STATION ALONG HIGHWAY 6 TO WACO DRIVE AND
ABANDON 1,300 FEET OF 12 INCH, 200 FEET OF 10 INCH, 2,200 FEET OF 8 INCH,
1,200 FEET OF 4 INCH, 100 FEET OF 2 INCH STEEL TO ACCOMODATE TXDOT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
4009 080.72765 16,889
INSTALL 1165 FEET OF 4 INCH POLY ALONG EAST JORDAN ROAD AND ABANDON
DRS01, 427 FEET OF 2 INCH STEEL, 986 FEET OF 3 INCH STEEL, 10 FEET OF 2 INCH
POLY AND 16 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JOSEPHINE SYSTEM INTEGRITY OCTOBER
4010 080.72767 552
INSTALL 1230 FEET OF 4 INCH POLY ALONG CADDO STREET AND ABANDON DRS 02
AND 1172 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JOSEPHINE SYSTEM INTEGRITY OCTOBER
4011 080.72773 12,032
INSTALL 1649 FEET OF 2 INCH POLY AND ABANDON 2083 FEET OF 2 INCH STEEL
ALONG STREETS OF LITTLE RIVER ACADEMY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LITTLE RIVER ACADEMY SYSTEM INTEGRITY OCTOBER
4012 080.72775 1,896
INSTALL 404 FEET OF 2 INCH POLY AND ABANDON 398 FEET OF 2 INCH STEEL
ALONG HOUSTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS NEWCASTLE SYSTEM INTEGRITY OCTOBER
4013 080.72776 (29)
INSTALL 2700 FEET OF 2 INCH AND 1500 FEET OF 4 INCH POLY ALONG THE
STREETS OF TRIPLE DIAMOND SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANSFIELD GROWTH SEPTEMBER
4014 080.72780 20,480
INSTALL 3200 FEET OF 4 INCH POLY AND ABANDON 630 FEET OF 4 INCH AND 620
FEET OF 3 INCH BARE STEEL AND 1900 FEET OF 4 INCH POLY AND DISTRICT
REGULATOR STATION 02 IN GODLEY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GODLEY SYSTEM INTEGRITY OCTOBER
4015 080.72782 483
INSTALL 3,715 FEET OF 4 INCH POLY AND 105 FEET OF 2 INCH POLY ALONG THE
STREETS OF SKYLINE ESTATES SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTCHINS GROWTH JUNE
4016 080.72783 629
INSTALL 280 FEET OF 2 INCH, 105 FEET OF 4 INCH AND 2692 FEET OF 6 INCH POLY
ALONG VICTORY AT FRONTIER PHASE 1. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PROSPER GROWTH JUNE
4017 080.72784 321,964
INSTALL 4580 FEET OF 4 INCH AND 4735 FEET OF 2 INCH POLY ALONG THE
STREETS OF PALMILLA SPRINGS SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER
4018 080.72785 11,506
RELOCATE FACILITIES. INSTALL 1050 FEET OF 2 INCH, 460 FEET OF 4 INCH AND
410 FEET OF 2 INCH POLY ALONG HOUSTON STREET AND RETIRE 400 FEET OF 6
INCH AND 440 FEET OF 4 INCH BARE STEEL AND 336 FEET OF 2 INCH AND 127 FEET
OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DENISON
RELOCATION OF
FACILITIES OCTOBER
4019 080.72786 1,898
INSTALL 5017 FEET OF 2 INCH POLY ALONG THE STREETS OF BLUFFVIEW
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JUNE
4020 080.72788 1,437
INSTALL 100 FEET OF 6 INCH POLY ALONG SOUTH MALONE ROAD. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL ALLEN GROWTH JUNE
4021 080.72789 10,078
RELOCATE FACILITIES. INSTALL 35 FEET OF 2 INCH POLY ALONG PEARL AND
ABANDON 30 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS
STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
4022 080.72795 350
RELOCATE FACILITIES. INSTALL 185 FEET OF 2 INCH POLY AND ABANDON 100
FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY ALONG BROUGHTON STREET
TO ACCOMMODATE CITY OF SHERMAN STREET PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
RELOCATION OF
FACILITIES OCTOBER
4023 080.72800 881
INSTALL 3100 FEET OF 2 INCH, AND 2600 FEET OF 4 INCH IP POLY GAS MAIN FOR
THE NEW GREENWAY TRAILS PHASE 4 SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL GRAND PRAIRIE GROWTH APRIL
4024 080.72801 24,238
REPLACE STEEL SERVICES WITH POLY SERVICES ON MAPSHEET IN BRYAN IN
ACCORDANCE WITH RAILROAD COMMISION RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
4025 080.72802 1,728
INSTALL 700 FEET OF 6 INCH AND 2600 FEET OF 4 INCH POLY ALONG THE STREETS
OF HARVEST DEVELOPMENT. RESIDENTIAL NORTHLAKE GROWTH OCTOBER
4026 080.72809 12,035
INSTALL 1170 FEET OF 2 INCH POLY AND ABANDON 1121 FEET OF 2 INCH STEEL
AND DISTRICT REGULATOR STATION 03 ALONG SWEETWATER STREET IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSCOE SYSTEM INTEGRITY OCTOBER
4027 080.72811 260
RELOCATION FACILITIES: INSTALL TAP AND RISER ALONG LINE RFB IN TAYLOR
COUNTY TO ACCOMMODATE A RELOCATED MEASURING STATION. ALL CUSTOMERS TUSCOLA
RELOCATION OF
FACILITIES APRIL
4028 080.72816 321 INSTALL 985 FEET OF 6 INCH POLY ALONG I35. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL GAINESVILLE GROWTH MARCH
4029 080.72819 333,268
RELOCATE FACILITIES. INSTALL 900 FEET OF 4 INCH POLY ALONG IMMANUEL
ROAD AND ABANDON 830 FEET OF 4 INCH POLY TO ACCOMMODATE CITY STREET
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS PFLUGERVILLE SYSTEM INTEGRITY DECEMBER
4030 080.72825 27,155
INSTALL 930 FEET OF 4 INCH POLY AND 1291 FEET OF 2 INCH POLY AND ABANDON
2000 FEET OF 3 IN STEEL AND 230 FEET OF 2 IN POLY ALONG BARNETT STREET IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER
4031 080.72826 119 INSTALL 600 FEET OF 6 INCH POLY ALONG IH35. ALL CUSTOMERS GAINESVILLE
SYSTEM
IMPROVEMENT MARCH
4032 080.72829 51,989 INSTALL 1600 FEET OF 12 INCH POLY ALONG STATE HIGHWAY 114. ALL CUSTOMERS FORT WORTH GROWTH JUNE
4033 080.72832 964
REPLACE DISTRICT REGULATOR STATION 04 IN WHITESBORO IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITESBORO SYSTEM INTEGRITY OCTOBER
4034 080.72834 242,609
INSTALL 1,100 FEET OF 12 INCH POLY ALONG THE STREETS OF REDDEN FARM
SUBDIVISION. ALL CUSTOMERS MIDLOTHIAN GROWTH DECEMBER
4035 080.72835 177,642
INSTALL DISTRICT REGULATOR STATION ALONG LINE L14 AND ABANDON DISTRICT
REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY OCTOBER
4036 080.72837 44,437
INSTALL 1750 FEET OF 2 INCH POLY ALONG RICKETTS STREET AND ABANDON 1086
FEET OF 2 INCH POLY, 34 FEET OF 2 INCH STEEL, 220 FEET OF 4 INCH STEEL, 200
FEET OF 2 INCH STEEL AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY DECEMBER
4037 080.72839 52,471
INSTALL 1331 FEET OF 2 INCH POLY ALONG THE WATERSIDE TOWNHOMES
DEVELOPMENT. RESIDENTIAL FORT WORTH GROWTH MARCH
4038 080.72840 2,333,283
INSTALL 6,945 FEET OF 2 INCH POLY ALONG MISTLETOE DRIVE AND ABANDN 2,035
FEET OF 4 INCH AND 1,285 FEET OF 2 INCH STEEL AND 240 FEET OF 4 INCH AND
5,945 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
4039 080.72841 84,411
INSTALL 6055 FEET 0F 4 INCH AND 1595 FEET OF 2 INCH POLY ALONG THE
STREETS OF ELIZABETH CREEK SUBDIVISION. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER
4040 080.72846 4,476
INSTALL 4797 FEET OF 2 INCH AND 1403 FEET OF 4 INCH POLY ALONG THE
STREETS OF THE HONEY CREEK SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL MCKINNEY GROWTH MARCH
4041 080.72847 373 INSTALL 90 FEET OF 2 INCH POLY ALONG WEST CREEK DRIVE IN DALLAS TX. RESIDENTIAL DALLAS GROWTH JULY
4042 080.72848 288
INSTALL 1880 FEET OF 4 INCH AND 2065 FEET OF 2 INCH POLY ALONG THE
STREETS OF NORTH STAR SUBDIVISION. RESIDENTIAL FORT WORTH GROWTH JUNE
4043 080.72849 1,355
INSTALL 1320 FEET OF 4 INCH AND 4200 FEET OF 2 INCH POLY ALONG THE
STREETS OF COPPER CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JULY
4044 080.72855 27,792
RELOCATE FACILITIES. INSTALL 380 FEET OF 6 INCH POLY ALONG SOUTH
COOPER STREET AND ABANDON 380 FEET OF 6 INCH POLY TO ACCOMMODATE
CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
4045 080.72858 151,048
INSTALL 3,990 FEET OF 2 INCH POLY ALONG THE STREETS OF MILRANY RANCH
SUBDIVISION IN COLLIN COUNTY. RESIDENTIAL MELISSA GROWTH SEPTEMBER
4046 080.72860 227,652
INSTALL 3,300 FEET OF 2 INCH AND 1,160 FEET OF 4 INCH POLY ALONG THE
STREETS OF LIBERTY IN COLLIN COUNTY RESIDENTIAL MELISSA GROWTH SEPTEMBER
MTX Additions
Page 122 of 178
341
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4047 080.72861 177,289
INSTALL 2,200 FEET OF 2 INCH AND 890 FEET OF 4 INCH POLY ALONG THE
STREETS OF LIBERTY IN COLLIN COUNTY. RESIDENTIAL MELISSA GROWTH JULY
4048 080.72862 147,777
INSTALL 1,980 FEET OF 2 INCH AND 490 FEET OF 4 INCH POLY ALONG THE
STREETS OF LIBERTY IN COLLIN COUNTY. RESIDENTIAL MELISSA GROWTH SEPTEMBER
4049 080.72863 22,336
PURCHASE 26 SENSIT GOLD INSTRUMENTS, 103 SENSIT GOLD G2 WITH TC
INSTRUMENTS, 2 TRAK-IT WITH TC INSTRUMENTS, AND 90 TRAK-IT IIIA WITH TC
INSTRUMENTS IN THE SOUTHEAST REGION. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT JUNE
4050 080.72866 2,549
INSTALL 1000 FEET OF 2 INCH POLY ALONG MODELLA COURT. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL DALLAS GROWTH MARCH
4051 080.72868 1,755
INSTALL 1536 FEET OF 6 INCH, 1073 FEET OF 4 INCH AND 3200 FEET OF 2 INCH
POLY ALONG THE STREETS OF HORIZON LAKE SUBDIVISION. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH APRIL
4052 080.72869 43,801
INSTALL 2800 FEET OF 2 INCH POLY ALONG GLOVER STREET, MULBERRY STREET,
NORTH DAVIS STREET AND ABANDON DISTRICT REGULATOR STATION #11 ALONG
CHURCH STREET AND GLOVER STREET, 905 FEET OF 4 INCH POLY, 545 FEET OF 4
INCH STEEL, 265 FEET OF 3 INCH POLY, 850 FEET OF 2 INCH STEEL AND 75 FEET
OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY OCTOBER
4053 080.72871 (4,803)
RELOCATE FACILITIES. INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 400
FEET OF 4 INCH POLY ALONG FREDERICK SQUARE TO ACCOMMODATE A
DEVELOPER PROJECT. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES MARCH
4054 080.72872 3,359
RELOCATE FACILITIES. INSTALL 290 FEET OF 2 INCH POLY AND ABANDON 290
FEET OF 2 INCH POLY ALONG FOSSIL CREEK BOULEVARD TO ACCOMMODATE CITY
OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4055 080.72878 71,305 INSTALL 5,235 FEET OF 8 INCH POLY ALONG TX-171 AND CR 1128. ALL CUSTOMERS GODLEY GROWTH JUNE
4056 080.72880 21,496
INSTALL (2) VALVES IN SWEETWATER, TX IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY OCTOBER
4057 080.72883 206
INSTALL 700 FEET OF 6 INCH POLY ALONG HIGHRIDGE TROPHY TRACTOR.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL BURLESON GROWTH JULY
4058 080.72884 1,696
INSTALL 256 FEET OF 2 INCH POLY AND ABANDON 256 FEET OF 2 INCH STEEL
ALONG BELKNAP IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS NEWCASTLE SYSTEM INTEGRITY OCTOBER
4059 080.72885 205,035
REPLACE 70 STEEL SERVICES WITH POLY SERVICES ALONG MAPSHEET IN
ACCORDANCE WITH RAILROAD COMMISION RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
4060 080.72886 86,337
REPLACE STEEL SERVICES WITH POLY SERVICES ALONG STREETS OF
BROWNWOOD ON MAPSHEET IN ACCORDANCE WITH RAILROAD COMMISION RULE
8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER
4061 080.72888 588
INSTALL 2,236 FEET OF 6 INCH POLY ALONG OLD BURLESON ROAD. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH MARCH
4062 080.72889 478,165
INSTALL 2,593 FEET OF 6 INCH AND 2,648 FEET OF 4 INCH AND 4,115 FEET OF 2
INCH POLY ALONG THE STREETS OF GODLEY RANCH SUBDIVISION. RESIDENTIAL GODLEY GROWTH JUNE
4063 080.72891 25,787
INSTALL 4 INCH DISTRICT REGULATOR STATION AND 200 FEET OF 8 INCH POLY
AND ABANDON 2 INCH DISTRICT REGULATOR STATION AND 200 FEET OF 6 INCH
POLY. ALL CUSTOMERS ROWLETT
SYSTEM
IMPROVEMENT DECEMBER
4064 080.72899 3,807 INSTALL 5,757 FEET OF 8 INCH POLY ALONG UNIVERSITY BOULEVARD AND CR 110. ALL CUSTOMERS ROUND ROCK GROWTH MARCH
4065 080.72905 40,508
INSTALL 1,960 FEET OF 2 INCH POLY ALONG THE STREETS OF SOUTHERN POINT
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH SEPTEMBER
4066 080.72906 889,141
RELOCATE FACILITIES. INSTALL 2,540 FEET OF 2 INCH AND 960 FEET OF 6 INCH
POLY ALONG EAST LOUISIANA STREET AND ABANDON 1,924 FEET OF 2 INCH
STEEL AND 848 FEET OF 6 INCH POLY IN MCKINNEY, COLLIN COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER
4067 080.72910 4,781
REPLACE 420 FEET OF 2 INCH STEEL WITH 420 FEET OF 2 INCH POLY ALONG
JEANELL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUITMAN SYSTEM INTEGRITY OCTOBER
4068 080.72912 (65)
INSTALL 3360 FEET OF 2 INCH POLY ALONG THE STREETS OF HEARTLAND 17.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH MARCH
4069 080.72914 (185)
INSTALL 920 FEET OF 2 INCH POLY ALONG THE STREETS OF HEARTLAND 16B.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH JANUARY
4070 080.72921 5,356
INSTALL 900 FEET OF 2 INCH POLY ALONG MAPLE STREET AND ABANDON 670
FEET OF 4 INCH STEEL, 250 FEET OF 3 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY OCTOBER
4071 080.72922 155 REPLACE PIG TRAP ALONG LINE W22 IN TARRANT COUNTY. ALL CUSTOMERS KELLER SYSTEM INTEGRITY JANUARY
4072 080.72923 1,485
INSTALL 6190 FEET OF 2 INCH POLY ALONG THE STREETS OF CROSS CREEK
PHASE 3 AND 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH APRIL
4073 080.72924 837
INSTALL 305 FEET OF 4 INCH POLY ALONG MCKINNEY RANCH PARKWAY.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL MCKINNEY GROWTH MARCH
4074 080.72926 111,819
NEW GROUNDBED INSTALLATAION BY MATCOR ON GBS RFB-09 AND RFB-30 IN
COLEMAN AND TAYLOR COUNTIES AT 495+23 AND 1538+33. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY JULY
4075 080.72927 2,684
REPLACE GROUNDBED U22-08 ON LINE U22 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCCAULLEY SYSTEM INTEGRITY OCTOBER
4076 080.72928 8,124
REPLACE 3 GROUND BEDS ALONG LINE U IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HAMLIN SYSTEM INTEGRITY OCTOBER
4077 080.72930 384,155
INSTALL 1,000 OF 4 INCH POLY ALONG MOCKINGBIRD AND AIRLINE IN DALLAS AND
ABANDON 1,400 FEET OF 16 INCH, 680 FEET OF 12 INCH AND 500 FEET OF 3 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY DECEMBER
4078 080.72935 113,436
INSTALL 2750 FEET OF 4 INCH POLY AND 1150 FEET OF 2 INCH POLY ALONG
RICHLAND AVENUE AND ABANDON 200 FEET OF 2 INCH STEEL, 800 FEET OF 2 INCH
POLY AND 1900 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY DECEMBER
4079 080.72947 143 INSTALL 450 FEET OF 2 INCH POLY ALONG WEST FM 93. ALL CUSTOMERS ROGERS GROWTH MARCH
4080 080.72948 188
INSTALL 1700 FEET OF 2 INCH POLY ALONG TROYAN LANE. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL TEMPLE GROWTH MARCH
4081 080.72949 (59)
REPLACE MEASURING STATION 4613 IN ELLIS AND INSTALL 120 FEET OF 4 INCH
STEEL. ALL CUSTOMERS ITALY
SYSTEM
IMPROVEMENT JANUARY
4082 080.72951 365
INSTALL 1430 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKESIDE VILLAS
DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SHADY SHORES GROWTH JUNE
4083 080.72954 64,673
INSTALL 1830 FEET OF 4 INCH POLY AND 620 FEET OF 2 INCH POLY ALONG
BELKNAP STREET AND ABANDON 1345 FEET OF 4 INCH STEEL, 445 FEET OF 2 INCH
STEEL AND DISTRICT REGULATOR STATION 06 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY OCTOBER
4084 080.72956 329
INSTALL 110 FEET OF 6 INCH POLY ALONG WHITESTONE ROAD. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL CEDAR PARK GROWTH JUNE
4085 080.72959 9,296
INSTALL 850 FEET OF 4 INCH POLY AND 80 FEET OF 8 INCH STEEL AND ABANDON
93 FEET OF 2 INCH STEEL, 650 FEET OF 4 INCH STEEL AND 845 FEET OF 2 INCH
POLY ALONG 8TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER
4086 080.72960 32,691
RELOCATE FACILITIES. INSTALL 3000 FEET OF 4 INCH POLY ALONG OAK STREET
AND ABANDON 3000 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FAIRFIELD
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FAIRFIELD
RELOCATION OF
FACILITIES OCTOBER
4087 080.72965 262
INSTALL 2300 FEET OF 2 INCH POLY ALONG THE STREETS OF CREEK MEADOWS
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH JUNE
4088 080.72967 12
INSTALL 3885 FEET OF 4 INCH POLY AND 5085 FEET OF 2 INCH POLY ALONG THE
STREETS OF BRIDGEVIEW PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JANUARY
4089 080.72969 7,582
INSTALL 1600 FEET OF 2 INCH POLY ALONG DEPOT STREET AND ABANDON 1205
FEET OF 3 INCH STEEL, 410 FEET OF 3 INCH POLY, 245 FEET OF 4 INCH STEEL AND
10 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DEPORT SYSTEM INTEGRITY OCTOBER
4090 080.72970 60,202
INSTALL 2400 FEET OF 2 INCH POLY AND 100 FEET OF 4 INCH STEEL ALONG
BELKNAP STREET AND ABANDON 2900 FEET OF 2 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY DECEMBER
MTX Additions
Page 123 of 178
342
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4091 080.72973 32,620
RELOCATE FACILITIES. INSTALL 722 FEET OF 4 INCH POLY AND ABANDON 514
FEET OF 4 INCH STEEL ALONG CRESTLINE ROAD TO ACCOMMODATE CITY OF
FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4092 080.72974 5,673
INSTALL 3000 FEET OF 2 INCH POLY ALONG THE STREETS OF THREE OAKS
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SHERMAN GROWTH JULY
4093 080.72975 71,883
RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY AND ABANDON 350
FEET OF 4 INCH STEEL IN THE CITY OF RICHLAND HILLS IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS SYSTEM INTEGRITY SEPTEMBER
4094 080.72978 15,181
RELOCATE FACILITIES. INSTALL 75 FEET OF 4 INCH STEEL AND ABANDON 75 FEET
OF 4 INCH STEEL ALONG THE STREETS OF RICHLAND HILLS DUE TO CITY OF
RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS
RELOCATION OF
FACILITIES DECEMBER
4095 080.72982 238,219
INSTALL 3,475 FEET OF 2 INCH AND 2,135 FEET OF 3 INCH POLY ALONG THE
STREETS OF WOODMERE RESIDENTIAL SUBDIVISION. RESIDENTIAL DENTON GROWTH OCTOBER
4096 080.72983 26,821
INSTALL 4600 FEET OF 2 INCH AND 300 FEET OF 4 INCH POLY ALONG STREETS OF
SAN ANGELO AND ABANDON 500 FEET OF 4 INCH STEEL, 2000 FEET OF 4 INCH
STEEL AND 200 FEET OF 2 INCH STEEL, 1200 FEET OF 4 INCH, 300 FEET OF 3 INCH
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
4097 080.72987 391,508
INSTALL 2,250 FEET OF 2 INCH POLY AND ABANDON 410 FEET OF 2 INCH ADYL A,
250 FEET OF 2 INCH POLY AND 1,590 FEET OF 2 INCH STEEL ALONG THE STREETS
OF ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
4098 080.72988 412,380
INSTALL 2,200 FEET OF 6 INCH AND 20 FEET OF 2 INCH POLY AND ABANDON 627
FEET OF 4 INCH, 540 FEET OF 2 INCH POLY AND 165 FEET OF 4 INCH, AND 636 FEET
OF 2 INCH STEEL ALONG THE STREETS OF ABILIENE, TAYLOR COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
4099 080.72989 1,021
INSTALL 7150 FEET OF 2 INCH POLY ALONG THE STREETS OF MERRITT VILLAGE.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROWLETT GROWTH JULY
4100 080.72990 194,708
INSTALL 1,150 FEET OF 2 INCH POLY AND ABANDON 1,150 FEET OF 2 INCH STEEL
ALONG THE STREETS OF ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
4101 080.72991 493,612
INSTALL 2,530 FEET OF 2 INCH POLY ALONG THE STREETS OF ABILENE AND
ABANDON 95 FEET OF 4 INCH, 250 FEET OF 2 INCH POLY AND 1,020 FEET OF 2
INCH, 1,165 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
4102 080.73006 238
INSTALL 2,495 FEET OF 2 INCH POLY ALONG THE STREETS OF AUDRA POINTE
SUBDIVISION. RESIDENTIAL DENTON GROWTH APRIL
4103 080.73007 11,591
INSTALL 1860 FEET OF 2 INCH POLY AND ABANDON 200 FEET OF 2 INCH POLY AND
1750 FEET OF 2 INCH STEEL ALONG CRAIG STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
4104 080.73018 420,888
INSTALL 675 FEET OF 6 INCH AND 5,600 FEET OF 2 INCH POLY ALONG THE
STREETS OF THE HAVEN SUBDIVISION IN WAXAHACHIE, ELLIS COUNTY. RESIDENTIAL WAXAHACHIE GROWTH OCTOBER
4105 080.73019 67,047
INSTALL 4,465 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKE FOREST
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH DECEMBER
4106 080.73023 54,192
INSTALL 900 FEET OF 4 INCH AND 300 FEET OF 2 INCH POLY ALONG THE STREETS
OF MIDTOWN RESERVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH SEPTEMBER
4107 080.73024 119,238
INSTALL 3,684 FEET OF 4 INCH POLY AND ABANDON 2,376 FEET OF 4 INCH STEEL,
ABANDON 1,308 FEET OF 3 INCH STEEL ALONG SHARON STREET AND GRACE
STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
4108 080.73025 59,549
RELOCATE FACILITIES. INSTALL 850 FEET OF 4 INCH POLY AND 1811 FEET OF 2
INCH POLY ALONG MEADOWBROOK DRIVE AND ABANDON 672 FEET OF 4 INCH
AND 1811 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON STREET
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
4109 080.73026 57,481
RELOCATE FACILITIES. INSTALL 2210 FEET OF 4 INCH POLY. 292 FEET OF 2 INCH
POLY AND ABANDON 599 FEET OF 4 INCH STEEL, 1611 FEET OF 3 INCH STEEL, 292
FEET OF 2 INCH STEEL ALONG HIGHLAND TO ACCOMMODATE CITY OF ARLINGTON
STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
4110 080.73027 177,184
INSTALL 2450 FEET OF 4 INCH AND 698 FEET OF 2 INCH POLY AND ABANDON 2450
FEET OF 4 INCH AND 470 FEET OF 2 INCH STEEL ALONG OVERHILL DRIVE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
4111 080.73028 30,748
RELOCATE FACILITIES. INSTALL 1842 FEET OF 2 INCH POLY AND ABANDON 1592
FEET OF 2 INCH STEEL ALONG JOYCE STREET TO ACCOMMODATE CITY OF
ARLINGTON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
4112 080.73029 34,745
INSTALL 346 FEET OF 4 INCH AND 587 FEET OF 2 INCH POLY AND ABANDON 293
FEET IF 4 INCH AND 587 FEET OF 2 INCH STEEL ALONG OVERHILL DRIVE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
4113 080.73030 171,293
INSTALL 643 FEET OF 4 INCH POLY AND 2245 FEET OF 2 INCH POLY ALONG
HIGHLAND DRIVE AND ABANDON 634 FEET OF 4 INCH STEEL AND 2245 FEET OF 2
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
4114 080.73031 74,829
RELOCATE FACILITIES. INSTALL 1503 FEET OF 4 INCH AND 1124 FEET OF 2 INCH
POLY ALONG BROWNING DRIVE AND ABANDON 845 FEET OF 4 INCH, 658 FEET OF 3
INCH AND 986 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
4115 080.73032 77,773
INSTALL 2665 FEET OF 4 INCH POLY ALONG STREETS OF ARLINGTON AND
ABANDON 1033 FEET OF 4 INCH AND 1518 FEET OF 3 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
4116 080.73033 75,531
INSTALL 1,832 FEET OF 4 INCH POLY, 593 FEET OF 2 INCH POLY AND ABANDON 155
FEET OF 6 INCH STEEL, 1,585 FEET OF 4 INCH STEEL, 457 FEET OF 2 INCH STEEL
ALONG EDNA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
4117 080.73039 23,307
INSTALL 650 FEET OF 2 INCH POLY MAIN ALONG TRADITION TRAIL. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL PLANO GROWTH MARCH
4118 080.73046 347
INSTALL 1540 FEET OF 4 INCH POLY ALONG MIDWAY ROAD. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL HALTOM CITY GROWTH APRIL
4119 080.73050 8,444
INSTALL 5372 FEET OF 2 INCH, 1961 FEET OF 4 INCH AND 518 FEET OF 12 INCH
POLY ALONG THE STREETS OF THE TRINITY FALLS. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL MCKINNEY GROWTH MARCH
4120 080.73053 37,966
INSTALL 450 FEET OF 6 INCH, 1,120 FEET OF 4 INCH, AND 1,050 FEET OF 2 INCH
POLY AND ABANDON 537 FEET OF 4 IN, 1210 FEET OF 2 IN STEEL AND 278 FEET OF
6 IN, AND 371 FEET OF 3 IN POLY ALONG MAIN STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
4121 080.73058 5,100
INSTALL 710 FEET OF 2 INCH POLY ALONG STREETS OF FORT WORTH AND
ABANDON 240 FEET OF 4 INCH STEEL AND 200 FEET OF 4 INCH CAST IRON AND 185
FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4122 080.73061 481
INSTALL 1000 FEET OF 4 INCH POLY ALONG STREETS OF BALCH SPRINGS.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL BALCH SPRINGS GROWTH JUNE
4123 080.73068 11,507
INSTALL 485 FEET OF 4 INCH POLY AND 2225 FEET OF 2 INCH POLY AND ABANDON
300 FEET OF 3 INCH POLY, 1500 FEET OF 4 INCH STEEL, 640 FEET OF 4 INCH STEEL
AND 680 FEET OF POLY ALONG MCDONALD STREET AND EAST 3RD STREET IN
ACCORDANCE WITH THE TEXAS RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY DECEMBER
4124 080.73070 21,441
REPAIR DENT WITH GOUGE ALONG LINE CA(2ND) WEST IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANCTUARY SYSTEM INTEGRITY OCTOBER
4125 080.73071 44,664
INSTAL DISTRICT REGULATOR STATION 01, 100 FEET OF 6 INCH POLY AND
ABANDON DISTRICT REGULATOR STATION 01, 100 FEET OF 2 INCH POLY ALONG
LINE 028-1. ALL CUSTOMERS SACHSE
SYSTEM
IMPROVEMENT MARCH
MTX Additions
Page 124 of 178
343
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4126 080.73079 6,626
INSTALL 376 FEET OF 4 INCH AND 8.249 FEET OF 2 INCH POLY ALONG THE
STREETS OF WOLF RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH JULY
4127 080.73083 40,329
INSTALL 2225 FEET OF 6 INCH POLY ALONG TRAIL LAKE DRIVE AND ABANDON 2225
FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4128 080.73086 157
INSTALL 325 FEET OF 4 INCH POLY AND 250 FEET OF 2 INCH POLY ALONG
SOUTHWEST PARKWAY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL COLLEGE STATION GROWTH MARCH
4129 080.73088 2,435
RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH POLY ALONG DARCY STREET
AND ABANDON 475 FEET OF 4 INCH AND 285 FEET OF 6 INCH STEEL TO
ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4130 080.73089 62,955
INSTALL DISTRICT REGULATOR STATION 02, 140 FEET OF 2 INCH POLY ABANDON
140 FEET OF 2 INCH STEEL, DISTRICT REGULATOR STATION 02 ALONG BENNIE
STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ROWENA SYSTEM INTEGRITY JUNE
4131 080.73091 7,378
INSTALL 1,600 FEET OF 2 INCH POLY ALONG THE STREETS OF CANTRO TRACE AND
LIBERO LANE IN TRAVISSO SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
4132 080.73094 13,982
RELOCATE FACILITIES. INSTALL 2292 FEET OF 6 INCH POLY AND ABANDON 1782
FEET OF 6 INCH STEEL AND 674 FEET OF 6 INCH POLY ALONG US82 TO
ACCOMMODATE CITY OF NOCONA HIGHWAY PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA
RELOCATION OF
FACILITIES OCTOBER
4133 080.73098 5,888
REPLACE 347 FEET OF 2 INCH STEEL, 170 FEET OF 2 INCH POLY AND 100 FEET OF
WITH 540 FEET OF POLY AND 100 OF 2 INCH POLY ALONG WALNUT IN
ACCORDANCE WTH THE RAIROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
4134 080.73107 23,227
INSTALL 1090 FEET OF 2 INCH POLY AND ABANDON 295 FEET OF 2 INCH STEEL, 809
FEET DUPONT, 53 FEET OF 2 INCH POLY, DISTRICT REGULATOR STATION 030
ALONG 14TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
4135 080.73110 66
INSTALL 175 FEET OF 2 INCH POLY ALONG GOUGH STREET. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH MARCH
4136 080.73111 32,777
INSTALL 1040 FEET OF 2 INCH POLY AND ABANDON 48 FEET OF 2 INCH POLY, 211
FEET OF 2 INCH POLY, 11 FEET OF 3 INCH POLY, 322 FEET OF 2 INCH STEEL, 1006
FEET OF 3 INCH STEEL, AND DISTRICT REGULATOR STATION 07 ALONG THE
STREETS OF GRANBURY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY DECEMBER
4137 080.73112 15,807
INSTALL 860 FEET OF 2 INCH POLY, 895 FEET OF 4 INCH POLY AND ABANDON 185
FEET OF 4 INCH STEEL, 215 FEET OF 3 INCH STEEL, 335 FEET OF 3 INCH POLY, 632
FEET OF 2 INCH POLY, 1,318 FEET OF 2 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
4138 080.73114 34,473
INSTALL 1,856 FEET OF 6 INCH, 5,548 FEET OF 4 INCH, 7,131 FEET OF 2 INCH POLY
ALONG THE STREETS OF HIGHLAND VILLAGE SUBDIVISION. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER
4139 080.73123 65,219
INSTALL 1,865 FEET OF 2 INCH POLY ALONG THE STREETS OF BEL GRAND
ESTATES SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HASLET GROWTH OCTOBER
4140 080.73131 183 INSTALL 1,449 FEET OF 4 INCH POLY ALONG HIDDEN VISTA BOULEVARD. ALL CUSTOMERS BURLESON GROWTH JUNE
4141 080.73133 748
INSTALL 1500 FEET OF 2 INCH POLY ALONG THE STREETS OF MISSION RANCH
PHASE 202. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH APRIL
4142 080.73134 (68) INSTALL 200 FEET OF 2 INCH POLY ALONG N 3RD STREET. RESIDENTIAL PRINCETON GROWTH MARCH
4143 080.73135 2,753
INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 375 FEET OF 2 INCH STEEL AND
12 FEET OF 2 INCH POLY ALONG ALDINE IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY OCTOBER
4144 080.73137 7,212
INSTALL 965 FEET OF 2 INCH POLY ALONG CALVERT STREET AND ABANDON 1130
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY OCTOBER
4145 080.73138 177,103
INSTALL 2020 FEET OF 4 INCH POLY AND 2000 FEET OF 2 INCH POLY ALONG THE
STREETS OF PIONEER POINT SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH APRIL
4146 080.73139 1,298
INSTALL 4,387 FEET 0F 2 INCH POLY AND 1,832 FEET OF 4 INCH POLY ALONG THE
STREETS OF HIGH COUNTRY SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BURLESON GROWTH JULY
4147 080.73140 2,211
RELOCATE FACILITIES. INSTALL 250 FEET OF 2 INCH POLY ALONG SW MAIN
STREET AND ABANDON 250 FEET OF 2 INCH STEEL TO ACCOMMODATE TXDOT
CULVERT REPLACEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
RELOCATION OF
FACILITIES OCTOBER
4148 080.73141 43,991
INSTALL 1,260 FEET OF 8 INCH, 702 FEET OF 4 INCH AND 4.156 FEET OF 2 INCH
POLY ALONG THE STREETS OF STAUNTON DRIVE AND MACARTHUR DRIVE IN
LARKSPUR SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH OCTOBER
4149 080.73142 24,382
INSTALL 305 FEET OF 4 INCH AND 2,395 FEET OF 2 INCH POLY ALONG THE
STREETS OF STAUNTON DRIVE IN LARKSPUR SUBDIVISION. DEVELOP INSTALLED
FACILITIES. RESIDENTIAL LEANDER GROWTH OCTOBER
4150 080.73143 2,101,920
INSTALL 1,859 FEET OF 6 INCH AND 5,757 FEET OF 12 INCH POLY ALONG COIT
ROAD IN LEXINGTON PARKS SUBDIVISION. ALL CUSTOMERS FRISCO GROWTH OCTOBER
4151 080.73147 5,567
INSTALL 35 FEET OF 4 INCH, 10 FEET OF 4 INCH, AND 25 FEET OF 2 INCH POLY AND
ABANDON 25 FEET OF 4 INCH STEEL, 15 FEET OF 2 INCH POLY, 10 FEET OF POLY
AND DRS12 AT SUNSET DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
4152 080.73148 1,362
RELOCATE FACILITIES. INSTALL 240 FEET OF 6 INCH POLY AND 250 FEET OF 4
INCH POLY AND ABANDON 240 FEET OF 6 INCH POLY AND 140 FEET OF 4 INCH
POLY ALONG DAY MIAR ROAD TO ACCOMMODATE MANSFIELD CITY STREETS
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD
RELOCATION OF
FACILITIES OCTOBER
4153 080.73153 140,929
INSTALL 4252 FEET OF 2 INCH POLY ALONG THE STREETS OF SUN CITY
SUBDIVISION. DEVELOPER INSTALLED FACILITIES RESIDENTIAL GEORGETOWN GROWTH JULY
4154 080.73155 3,115
RELOCATE FACILITIES. INSTALL 12 FEET OF 2 INCH POLY AND ABANDON 6 FEET
OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAD STORM SEWER
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
4155 080.73158 12,805
RELOCATE FACILITIES. INSTALL 1230 FEET OF 6 INCH POLY AND ABANDON 1205
FEET OF 6 INCH POLY ALONG FM 156 TO ACCOMMODATE CITY OF FORT WORTH
STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4156 080.73159 288,426
INSTALL 637 FEET OF 2 INCH, 352 FEET OF 4 INCH POLY ALONG MORSE STREET,
JACKSON STREET AND HILL ALLEY STREET IN DENTON AND ABANDON 833 FEET
OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER
4157 080.73163 1,632
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY ALONG MELBA AND
ABANDON 60 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
4158 080.73164 481,605
RELOCATE FACILITIES. INSTALL 3,100 FEET OF 2 INCH POLY ALONG HAVENHURST
AND NESTLE DR AND ABANDON 2,950 FEET OF 2 INCH STEELAND 150 FEET OF 1.25
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY SEPTEMBER
4159 080.73165 4,511
INSTALL 925 FEET OF 2 INCH POLY ALONG THE STREETS OF WILDERNESS MOBILE
HOME PARK SUBDIVISION AND ABANDON 906 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER
4160 080.73169 91,909
RELOCATE FACILITIES. INSTALL 1400 FEET OF 12 INCH POLY, 10 FEET OF 6 INCH
POLY, 70 FEET OF 4 INCH POLY, 50 FEET OF 2 INCH POLY ALONG E TERRELL AND
ABANDON 1400 FEET OF 10 INCH STEEL, 10 FEET OF 6 INCH POLY, 10 FEET OF 4
INCH POLY, 10 FEET OF 3 INCH POLY TO ACCOMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4161 080.73171 117,570
INSTALL 1,700 FEET OF 4 INCH, 2,060 FEET OF 2 INCH POLY ALONG THE STREETS
OF WEST END SUBDIVISION IN MCGREGOR IN MCLENNAN COUNTY. RESIDENTIAL MC GREGO GROWTH DECEMBER
MTX Additions
Page 125 of 178
344
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4162 080.73173 81,001
RELOCATE FACILITIES. INSTALL 356 FEET OF 6 INCH POLY AND ABANDON 340
FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF IRVING STREET PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
4163 080.73174 1,190
RELOCATE FACILITES. INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 183 FEET
OF 2 INCH POLY ALONG SHEPHERD STREET TO ACCOMMODATE CITY OF IRVING
STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
4164 080.73175 13,621
INSTALL 7.264 FEET OF 2 INCH AND 568 FEET OF 4 INCH POLY ALONG THE
STREETS OF COLLINSBROOK FARMS SUBDIVISION IN FRISCO, COLLIN COUNTY.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH DECEMBER
4165 080.73182 2,241,825
INSTALL 5,600 FEET OF 4 INCH, 2,100 FEET OF 2 INCH POLY ALONG IRVING
BOULEVARD BETWEEN SOWERS ROAD AND STRICKLAND PLAZA IN IRVING AND
ABANDON 4,455 FEET OF 4 INCH, 68 FEET OF 3 INCH, 621 FEET OF 1.25 INCH, 84
FEET OF 2 INCH STEEL AND 283 FEET OF 4 INCH, 284 FEET OF 3 INCH, 1,147 FEET
OF 2 INCH AND 885 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER
4166 080.73183 4,556
INSTALL 4,805 FEET OF 4 INCH AND 4,100 FEET OF 2 INCH POLY ALONG STREETS
OF BROADMOOR ESTATES SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL OVILLA GROWTH APRIL
4167 080.73184 451
INSTALL 2,110 FEET OF 4 INCH AND 4,160 FEET OF 2 INCH POLY ALONG THE
STREETS OF OAKMONT PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL RED OAK GROWTH MARCH
4168 080.73192 1,662,850
INSTALL 10,000 FEET OF 8 INCH POLY AND 331 FEET OF STEEL CASING ALONG THE
STREETS OF THE OAKS SUBDIVISION. ALL CUSTOMERS RED OAK GROWTH SEPTEMBER
4169 080.73193 48,879
INSTALL 3,800 FEET OF 4 INCH AND 540 FEET OF 2 INCH POLY ALONG THE
STREETS OF KELLER.
COMMERCIAL OR
INDUSTRIAL KELLER GROWTH SEPTEMBER
4170 080.73194 72,116
INSTALL 1607 FEET OF 2 INCH POLY AND 2316 FEET OF 4 INCH POLY STREETS OF
HILLSBORO AND ABANDON 1688 FEET OF 4 INCH STEEL, 188 FEET OF 3 INCH
STEEL, 947 FEET OF 2 INCH STEEL AND 422 FEET OF 1.25 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
4171 080.73199 1,230
INSTALL 2500 FEET OF 2 INCH, AND 3500 FEET OF 4 INCH POLY ALONG THE NEW
GREENWAY TRAILS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GRAND PRAIRIE GROWTH JUNE
4172 080.73210 488
REPLACE (3) DEPLETED GROUNDBEDS IN THE CITY OF LAKEPORT AT THE AAA
MOBILE HOME PARK IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS LAKEPORT SYSTEM INTEGRITY OCTOBER
4173 080.73214 3,013
INSTALL 715 FEET OF 2 INCH POLY ALONG THE STREETS OF NORTHBROOK PLACE
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PLANO GROWTH JUNE
4174 080.73215 54 INSTALL 100 FEET OF 2 INCH POLY ALONG BLUEBONNET STREET. ALL CUSTOMERS FREDERICKSBURG GROWTH MARCH
4175 080.73216 70,211
INSTALL 700 FEET OF 6 INCH, 1,600 FEET OF 4 INCH AND 3,000 FEET OF 2 INCH
POLY ALONG THE STREETS OF MIRA LOGO CROSSING SUBDIVISION IN
MANSFIELD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GRAND PRAIRIE GROWTH DECEMBER
4176 080.73220 2,433
INSTALL 1560 FEET OF 2 INCH POLY ALONG THE STREETS OF OLD TOWN EAST
DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH DECEMBER
4177 080.73221 23,998
INSTALL 525 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION
5, 50 FEET OF 4 INCH STEEL, 390 FEET OF 3 INCH STEEL, 450 FEET OF 4 INCH POLY
AND 720 FEET OF 2 INCH POLY ALONG MARBLE STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WYLIE SYSTEM INTEGRITY OCTOBER
4178 080.73224 8,122
INSTALL 2300 FEET OF 2 INCH POLY ALONG 5TH STREET AND ABANDON DISTRICT
REGULATOR STATION 02, 670 FEET OF 2 INCH STEEL, 1045 FEET OF 3 INCH STEEL,
40 FEET OF 3 INCH STEEL, 120 OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CRANDALL SYSTEM INTEGRITY OCTOBER
4179 080.73225 75,432
INSTALL 3175 FEET OF 2 INCH AND 873 FEET OF 4 INCH POLY ALONG THE STREETS
OF LEXINGTON PARKS SUBDIVISION. RESIDENTIAL FRISCO GROWTH JUNE
4180 080.73226 34,017
INSTALL 1060 FEET OF 2 INCH POLY ALONG STREETS OF MESQUITE AND
ABANDON 925 FEET OF 2 INCH STEEL, 955 FEET OF 4 INCH STEEL AND DISTRICT
REGULATOR STATION 03 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY OCTOBER
4181 080.73228 30,517
INSTALL 2200 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR
STATION 9, 710 FEET OF 4 INCH STEEL, 1215 FEET OF 3 INCH STEEL, 450 FEET OF 4
INCH POLY AND 430 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
4182 080.73230 17,450
INSTALL (2) 8 INCH 3-WAY TEES, (2) 8 INCH TRANSITIONS, (1) 8 INCH POLY VALVE,
340 FEET OF 8 INCH POLY ALONG WYCLIFF AND ABANDON 340 FEET OF 10 INCH
STEEL WITH ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4183 080.73233 12,518
INSTALL (1) 12 INCH X16 INCH SHORT STOP, (2) 10 INCH 3-WAY TEES, (3) 12 INCH
TRANSITIONS, (1) 12 INCH POLY VALVE , 20 FEET OF 12 INCH POLY ALONG
DOUGLAS STREET AND HAWTHORNE STREET AND ABANDON 20 FEET OF 10 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4184 080.73235 3,709
INSTALL 554 FEET OF 2 INCH POLY ALONG HERO WAY IN LEANDER, WILLIAMSON
COUNTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL LEANDER GROWTH JUNE
4185 080.73238 109,505
INSTALL (1) 12 INCH X16 INCH FOLDING SHORT STOP, (1) 10 INCH 3 WAY TEE, (2) 12
INCH TRANSITIONS, (1) 12 INCH POLY VALVE, 55 FEET OF 12 INCH POLY AND
ABANDON 55 FEET OF 16 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4186 080.73241 42,801
INSTALL (2) SPHERICAL TEES, (2) 12 INCH TRANSITIONS, (1) 12 INCH POLY VALVE,
AND 35 FEET OF 12 INCH POLY AND ABANDON 35 FEET OF 12 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY DECEMBER
4187 080.73245 226,079
INSTALL 2400 FEET OF 4 INCH POLY ALONG SPRING PARK AND ABANDON 2400
FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
4188 080.73246 76,784
INSTALL 2200 FEET OF 4 INCH POLY ALONG JUPITER AND ABANDON 2200 OF 4
INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
4189 080.73247 3,113
INSTALL 680 FEET OF 6 INCH, 360 FEET OF 4 INCH, AND 3455 FEET OF 2 INCH POLY
ALONG THE STREETS OF LAKES AT RIVER TRAILS SUBDIVISION. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JUNE
4190 080.73251 133
INSTALL 144 FEET OF 6 INCH POLY ALONG COUNTY ROAD 180. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL CEDAR PARK GROWTH APRIL
4191 080.73252 7,610
INSTALL 910 FEET OF 2 INCH POLY ALONG THE STREETS OF VIZCAYA SUBDIVSION.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
4192 080.73253 564
INSTALL 2300 FEET OF 2 INCH POLY ALONG THE STREETS OF EDEN TERRANCE
SUBDIVISION. RESIDENTIAL ARLINGTON GROWTH JUNE
4193 080.73254 51,334
RELOCATE FACILITIES. INSTALL 8 POLY SERVICES AND ABANDON 8 POLY
SERVICES ALONG WESTCLIFF TO ACCOMMODATE CITY OF FORT WORTH STREET
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4194 080.73255 12,700
INSTALL 5180 FEET OF 2 INCH POLY ALONG THE STREETS OF THE RESERVE AT
NORTH FORK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JUNE
4195 080.73256 801
INSTALL 2190 FEET OF 4 INCH AND 2860 FEET OF 2 INCH POLY ALONG THE
STREETS OF SONOMA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH APRIL
4196 080.73257 520
INSTALL 3645 FEET OF 4 INCH POLY ALONG THE STREETS OF SONOMA VERDE
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH JUNE
4197 080.73259 1,832
INSTALL 10 FEET OF 6 INCH POLY AND ABANDON 10 FEET OF 6 INCH POLY ALONG
BLUFF AND 10TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
4198 080.73260 762
INSTALL RELIEF VALVE ALONG COLLEGE STREET AND ABANDON RELIEF VALVE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE SYSTEM INTEGRITY OCTOBER
4199 080.73261 52,861
INSTALL 3482 FEET OF 2 INCH AND 879 FEET OF 6 INCH POLY ALONG THE STREETS
OF LEXINGTON PARKS SUBDIVISION. RESIDENTIAL FRISCO GROWTH JUNE
4200 080.73263 (28)
INSTALL 235 FEET OF 2 INCH POLY ALONG 2200 BLOCK OF NORTH VILLAGE DRIVE
IN BONHAM. RESIDENTIAL BONHAM GROWTH JANUARY
MTX Additions
Page 126 of 178
345
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4201 080.73265 18,785
REPLACE 119 STEEL SERVICES WITH POLY SERVICES ON MAPSHEET #AM249372
IN BRYAN IN ACCORDANCE WITH RAILROAD COMMISION RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
4202 080.73266 18,451
REPLACE 84 STEEL SERVICE LINES IN BRYAN IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
4203 080.73267 10,603
INSTALL 2150 FEET OF 2 INCH POLY ALONG CHURCH STREET AND ABANDON
DISTRICT REGLUATOR STATION AND 2150 FEET STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LITTLE RIVER ACADEMY SYSTEM INTEGRITY OCTOBER
4204 080.73269 185,256
INSTALL 2,590 FEET OF 2 INCH AND 2,675 FEET OF 4 INCH POLY ALONG THE
STREETS OF KINGS RIDGE SUBDIVISION IN DENTON. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL DENTON GROWTH OCTOBER
4205 080.73273 79,410
INSTALL 3000 FEET OF 2 INCH POLY ALONG STREETS OF MESQUITE AND
ABANDON 390 FEET OF 3 INCH CAST IRON, 1661 FEET OF 3 INCH STEEL AND 849
FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY DECEMBER
4206 080.73283 5,818
INSTALL 900 FEET OF 2 INCH POLY AND ALONG GREY STREET AND ABANDON
DISTRICT REGULATOR STATION 01, 525 FEET OF 4 INCH POLY, 350 FEET OF 4 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DEPORT SYSTEM INTEGRITY OCTOBER
4207 080.73284 6,432 INSTALL 100 FEET OF 2 INCH POLY ALONG PRAIRIE AVENUE. RESIDENTIAL DALLAS GROWTH APRIL
4208 080.73285 80,973
INSTALL 4.384 FEET OF 2 INCH POLY ALONG COIT ROAD AND CHARISMATIC
PARKWAY IN LEXINGTON PARKS SUBDIVISION IN FRISCO, COLLIN COUNTY, RESIDENTIAL FRISCO GROWTH DECEMBER
4209 080.73286 15,578
INSTALL 3406 FEET OF 6 INCH, 900 FEET OF 4 INCH, AND 6298 FEET OF 2 INCH
POLY ALONG THE STREETS OF BROOKLANDS SUBDIVISION. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH JULY
4210 080.73288 5,459
INSTALL 1175 FEET OF 4 INCH POLY, 390 FEET OF 2 INCH POLY AND ABANDON
DISTRICT REGULATOR STATION 35, 230 FEET OF 4 INCH STEEL AND 460 FEET OF 2
INCH POLY AND 165 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER
4211 080.73293 2,261
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY ALONG MONETARY
LANE AND ABANDON 100 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON
RELOCATION OF
FACILITIES OCTOBER
4212 080.73297 24,854
RELOCATE FACILITIES. INSTALL 80 FEET OF 4 INCH POLY, 900 FEET OF 6 INCH
POLY, 45 FEET OF 8 INCH POLY, 20 FEET OF 2 INCH POLY ALONG MAIN STREET
AND ABANDON 17 FEET 4 INCH STEEL, 53 FEET OF 6 INCH CAST IRON, 365 FEET OF
6 INCH STEEL, 459 FEET OF 6 INCH POLY, 44 FEET OF 8 INCH STEEL, 12 FEET OF 2
INCH POLY, 55 FEET OF 4 INCH POLY, 16 FEET OF 6 INCH STEEL TO ACCOMODATE
THE CITY OF FORT WORTH SEWAR PROJECT. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4213 080.73300 85,117
INSTALL 2176 FEET OF 2 INCH POLY AND 1005 FEET OF 4 INCH POLY ALONG
STREETS OF HILLSBORO AND ABANDON 312 FEET OF 3 INCH POLY, 1355 FEET OF
VARIOUS SIZE STEEL AND 1582 FEET OF 4 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY NOVEMBER
4214 080.73301 13
INSTALL 1927 FEET OF 2 INCH POLY ALONG THE STREETS OF HOMESTEAD PHASE
3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JANUARY
4215 080.73304 3,366
INSTALL 135 FEET OF 2 INCH POLY ALONG THE STREET OF MANSIONS
CLUBHOUSE SUBDIVISION. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL UNINCORPORATED GROWTH JUNE
4216 080.73305 52
INSTALL 390 FEET OF 2 INCH POLY ALONG COPPERFIELD DRIVE. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL COLLEGE STATION GROWTH JUNE
4217 080.73306 5,332
RELOCATE FACILITIES. INSTALL 340 FEET OF 2 INCH POLY AND ABANDON 340
FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF WACO STREET PROJECT
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
4218 080.73308 26,396
INSTALL 1,780 FEET OF 4 INCH, 30 FEET OF 6 INCH AND 60 FEET OF 2 INCH POLY
AND ABANDON 1,340 FEET OF 4 INCH, 30 FEET OF 6 INCH, 390 FEET OF 3 INCH,
AND 80 FEET OF 2 INCH STEEL ALONG MULBERRY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARCHER CITY SYSTEM INTEGRITY OCTOBER
4219 080.73309 10,943
RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH POLY AND ABANDON 345
FEET OF 2 INCH POLY TO ACCOMODATE THE CITY OF SEAGOVILLE STREET
IMPROVEMENT PROJECT. ALL CUSTOMERS SEAGOVILLE
RELOCATION OF
FACILITIES OCTOBER
4220 080.73315 733,653
INSTALL 2,200 FEET OF 6 INCH POLY ALONG CURTIS AND ALVORD IN QUANAH AND
ABANDON 2,000 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY DECEMBER
4221 080.73322 1,654,344
INSTALL 3,135 FEET OF 8 INCH, 409 FEET OF 4 INCH, AND 2,358 FEET OF 2 INCH
POLY ALONG MACARTHUR BOULEVARD IN IRVING AND ABANDON 3,135 FEET OF 8
INCH, 494 FEET OF 4 INCH, AND 448 FEET OF 2 INCH STEEL AND 80 FEET OF 4
INCH, 229 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER
4222 080.73326 801 INSTALL 180 FEET OF 2 INCH POLY ALONG NAVARRO STREET. RESIDENTIAL RICHLAND GROWTH JULY
4223 080.73327 1,480
RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY ALONG PRESTON ROAD
AND ABANDON 292 FEET OF 4 INCH STEEL AND 49 FEET OF 4 POLY TO
ACCOMODATE THE CITY OF SHERMAN STREET IMPROVEMENT PROJECT. ALL CUSTOMERS VAN ALSTYNE
RELOCATION OF
FACILITIES OCTOBER
4224 080.73328 215,755
INSTALL 2,485 FEET OF 4 INCH AND 3,970 FEET OF 2 INCH POLY ALONG STREETS
OF HAMPTON PARK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GLENN HEIGHTS GROWTH SEPTEMBER
4225 080.73329 142,592
RELOCATE FACILITIES.&NBSP; INSTALL 347 FEET OF 6 INCH POLY ALONG AVENUE
A NEAR 4TH STREET AND ABANDON 226 FEET OF 6 INCH POLY DUE TO CITY OF
TEMPLE PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY SEPTEMBER
4226 080.73335 285
INSTALL 2585 FEET OF 2 INCH POLY MAIN ALONG THE STREETS OF VILLAS OF
MIDDLETON PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PLANO GROWTH MARCH
4227 080.73342 144,348
INSTALL 123 FEET OF 4 INCH POLY ALONG 5TH STREET AND MAIN STREET AND
ABANDON FRISCO DISTRICT REGULATOR STATION #01, 64 FEET OF 4 INCH STEEL
AND 3 FEET OF 4 INCH, 38 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO SYSTEM INTEGRITY SEPTEMBER
4228 080.73343 1,792
RELOCATE FACILITIES. INSTALL 750 FEET OF 6 INCH POLY AND ABANDON 650
FEET OF 6 INCH STEEL ALONG WINBROOK DRIVE TO ACCOMMODATE CITY OF
BENBROOK STREETS PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK
RELOCATION OF
FACILITIES OCTOBER
4229 080.73347 3,382
REPLACE DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER
4230 080.73348 2,186
INSTALL 190 FEET OF 4 INCH AND 100 FEET OF 2 INCH POLY ALONG NORTH
COUNTY ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FRISCO GROWTH MARCH
4231 080.73349 0 INSTALL 225 FEET OF 2 INCH POLY ALONG COLLEGE AVENUE.
COMMERCIAL OR
INDUSTRIAL SNYDER GROWTH JANUARY
4232 080.73350 16,382
INSTALL 350 FEET OF 4 INCH AND 1120 FEET OF 2 INCH POLY ALONG THE STREETS
OF THE MERDIAN SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SAN ANGELO GROWTH MARCH
4233 080.73351 (66)
INSTALL 1520 FEET OF 2 INCH POLY ALONG THE STREETS OF FAIRWAYS AT
CRYSTAL FALLS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH MARCH
4234 080.73352 958,394
INSTALL 1,309 FEET OF 8 INCH STEEL ALONG SMOTHERMAN ROAD IN LITTLE ELM
AND ABANDON 1,266 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LITTLE ELM SYSTEM INTEGRITY DECEMBER
4235 080.73358 46,869
RELOCATE FACILITIES. INSTALL 1900 FEET OF 4 INCH POLY ALONG SYMPHONY
LANE AND ABANDON 1900 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF
DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
4236 080.73361 4,184
RELOCATE FACILITIES. INSTALL 50 OF 8 INCH POLY ALONG PACIFIC STREET AND
ABANDON 50 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
4237 080.73362 271
RELOCATE FACILITIES. INSTALL 25 FEET OF 4 INCH POLY AND RETIRE 15 FEET OF
4 INCH STEEL TO ACCOMMODATE CITY STREET PROJECT IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 127 of 178
346
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4238 080.73371 298,816
INSTALL 1950 FEET OF 2 INCH, 500 FEET OF 4 INCH AND 3950 FEET OF 6 INCH POLY
AND ABANDON 190 FEET OF 3 INCH, 2015 FEET OF 4 INCH, 450 FEET OF 4 INCH
STEEL, 50 FEET OF 6 INCH POLY, 4760 FEET OF 8 INCH POLY AND 390 FEET OF 8
INCH STEEL AND DISTRICT REGULATOR STATION 93 ALONG SAMUEL BOULEVARD
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4239 080.73372 (48,696) PURCHASE 375 LINE LOCATORS FOR USE IN NORTH REGION. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT JUNE
4240 080.73375 265,261
INSTALL 5,630 FEET OF 2 INCH AND 1,350 FEET OF 6 INCH POLY ALONG THE
STREETS OF THE MEADOW RUN SUBDIVISION IN MELISSA, COLLING COUNTY. RESIDENTIAL MELISSA GROWTH DECEMBER
4241 080.73379 2,497
INSTALL 300 FEET OF 4 INCH POLY AND 15 FEET OF 2 INCH POLY AND ABANDON 3
INCH STEEL ALONG WOOD STREET AND MANSARD STREET IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER
4242 080.73380 107 INSTALL 40 FEET OF 4 INCH POLY ALONG JUDGE ELY.
COMMERCIAL OR
INDUSTRIAL ABILENE GROWTH APRIL
4243 080.73382 615
INSTALL 545 FEET OF 6 INCH, 2110 FEET OF 4 INCH, AND 1090 FEET OF 2 INCH
POLY ALONG THE STREETS OF PEBBLE CREEK DEVELOPMENT. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH MARCH
4244 080.73384 2,075
RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG ARTERIAL H AND
REMOVE 98 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF ROUND ROCK
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
RELOCATION OF
FACILITIES OCTOBER
4245 80.73386 1,983
INSTALL 950 FEET OF 2 INCH POLY ALONG BURNSIDE DRIVE. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL WICHITA FALLS GROWTH JUNE
4246 080.73387 64,474
RELOCATE FACILITIES. INSTALL 910 FEET OF 6 INCH POLY ALONG LEGACY DRIVE
AND ABANDON 910 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF PLANO
IMPROVMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES OCTOBER
4247 080.73388 25,434
RELOCATE FACILITIES. INSTALL 600 FEET OF 8 INCH POLY AND ABANDON 417
FEET OF 4 INCH STEEL AND 60 FEET OF 4 INCH POLY ALONG HIGHWAY 83-84 IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
RELOCATION OF
FACILITIES DECEMBER
4248 080.73389 743
RELOCATE FACILITIES. INSTALL 250 FEET OF 2 INCH POLY AND ABANDON 250
FEET OF 2 INCH STEEL ALONG COUNTRY CLUB ROAD TO ACCOMATE THE CITY OF
ENNIS STEET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
RELOCATION OF
FACILITIES OCTOBER
4249 080.73390 253,790
INSTALL 2,200 FEET OF 6 INCH POLY ALONG BLUE MOUND ROAD AND ABANDON
2,130 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS HASLET SYSTEM INTEGRITY SEPTEMBER
4250 080.73391 1,788
INSTALL 636 FEET OF 2 INCH POLY ALONG WINDY PARK DRIVE. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH MARCH
4251 080.73393 2,300,598
CONSTRUCT NEW OFFICES, RESTROOMS, AND CONFERENCE ROOMS IN THE
ROUND ROCK SERVICE CENTER IN WILLIAMSON COUNTY TO ACCOMMODATE THE
INCREASED STAFFING LEVELS REQUIRED TO SUPPORT THE GROWING
OPERATIONS, MAINTENANCE, AND CAPITAL CONSTRUCTION ACTIVITIES IN THE
AREA. THE PROJECTS ALSO INCLUDES THE REPLACEMENT OF THE HVAC AND
ELECTRICAL SYSTEM TO COMPLY WITH THE CURRENT ENERGY CODE
REQUIREMENTS TO MAINTAIN LEED CERTIFICATION. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER
4252 080.73399 9,838,806
INSTALL 9 MILES OF 8 INCH POLY ALONG SH 29 IN LIBERTY HILL, WILLIAMSON
COUNTY. ALL CUSTOMERS GEORGETOWN
SYSTEM
IMPROVEMENT DECEMBER
4253 080.73405 16,033
INSTALL 2350 FEET OF 2 INCH POLY AND ABANDON 1030 FEET OF 4 INCH STEEL,
1320 FEET OF 3 INCH STEEL, AND DISTRICT REGULATOR STATION 16 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY OCTOBER
4254 080.73406 8,599
INSTALL 2400 FEET OF 2 INCH POLY ALONG EAST TRAVIS STREET AND ABANDON
1150 FEET OF 2 INCH POLY, 1280 FEET OF 2 INCH STEEL, DISTRICT REGULATOR
STATION 01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS HOLLAND SYSTEM INTEGRITY OCTOBER
4255 080.73407 19,632
INSTALL 336 FEET OF 2 INCH POLY 1183 OF 4 INCH POLY AND ABANDON 1300 FEET
OF 3 INCH STEEL, 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISION
OF TEXAS RULE 8.209. ALL CUSTOMERS COPPERAS COVE SYSTEM INTEGRITY OCTOBER
4256 080.73410 9,011
INSTALL 3,170 FEET OF 2 INCH POLY ALONG CHO STREET AND ABANDON 1015
FEET OF 4 INCH STEEL, 215 FEET OF 2 INCH STEEL, 525 FEET OF 2 INCH STEEL,
1005 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
4257 080.73411 691,387
INSTALL 950 FEET OF 4 INCH AND 3,700 FEET OF 2 INCH POLY ALONG THE
STREETS OF RICHLAND AVE AND BEE STREET IN FARMERS BRANCH AND
ABANDON 950 FEET OF 4 INCH AND 3,700 FEET OF 2 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY OCTOBER
4258 080.73413 18,898
INSTALL 594 FEET OF 4 INCH, 1,836 FEET OF 2 INCH POLY AND ABANDON 330 FEET
OF 4 INCH STEEL, 394 FEET OF 3 INCH POLY, AND 145 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
4259 080.73430 223
RELOCATE FACILITIES. INSTALL 40 FEET OF 6 INCH POLY AND ABANDON 40 FEET
OF 6 INCH POLY ALONG HICKIX ROAD. ALL CUSTOMERS ROWLETT
RELOCATION OF
FACILITIES SEPTEMBER
4260 080.73439 897
INSTALL 2210 FEET OF 2 INCH POLY ALONG THE STREET OF WILLIAMS CREEK
DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH JUNE
4261 080.73442 21,345
INSTALL 1,072 FEET OF 4 INCH AND 1,617 FEET OF 2 INCH POLY ALONG STREETS
OF GRAND PRAIRIE AND ABANDON 378 FEET OF 4 INCH, 1410 FEET OF 2 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
4262 080.73443 4,599
RELOCATE FACILITIES. INSTALL (2) POLY SERVICES ALONG COLLINS AND
ABANDON 656 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES OCTOBER
4263 080.73450 24,059
INSTALL 1400 FEET OF 2 INCH POLY ALONG STREETS OF MEXIA AND ABANDON
1400 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY OCTOBER
4264 080.73451 21,265 INSTALL 650 FEET OF 4 INCH POLY ALONG EULESS BOULEVARD IN EULESS.
COMMERCIAL OR
INDUSTRIAL EULESS GROWTH OCTOBER
4265 080.73452 153,297
RELOCATE FACILITIES. INSTALL 1,380 FEET OF 2 INCH POLY ALONG WEST
COMMERCE AND ABANDON 1,465 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY APRIL
4266 080.73453 28,683
INSTALL 1864 FEET OF 4 INCH AND 277 FEET OF 2 INCH POLY ALONG BARNETT
STREET AND ABANDON 1830 FEET OF 3 INCH AND 180 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER
4267 080.73454 408,046
RELOCATE FACILITIES. INSTALL 1,933 FEET OF 4 INCH POLY ALONG NORTH
STREET AND 538 FEET OF 2 INCH POLY ALONG ROBINSON AVENUE AND ABANDON
925 FEET OF 3 INCH POLY, 135 FEET OF 2 INCH POLY, 410 FEET OF 2 INCH STEEL
AND 95 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE TEXAS RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY SEPTEMBER
4268 080.73455 587,809
INSTALL 2,692 FEET OF 2 INCH POLY ALONG FORD ST AND COLLEGE STREET AND
429 FEET OF 4 INCH POLY ALONG 5TH STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY DECEMBER
4269 080.73457 1,266,296
INSTALL 3,000 FEET OF 4 INCH, 200 FEET OF 2 INCH POLY ALONG CUSTER STREET
IN RICHARDSON AND ABANDON 1,000 FEET OF 4 INCH STEEL AND 2,000 FEET OF 4
INCH, AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY DECEMBER
4270 080.73460 193,809
RELOCATE FACILITIES.
INSTALL 1,550 FEET OF 2 INCH POLY ALONG PALESTINE STREET AND ABANDON
1,550 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER
4271 080.73462 154,677
RELOCATE FACILITIES. INSTALL 1,400 FEET OF 2 INCH POLY ALONG MCCLENDON
STREET AND ABANDON 1,300 OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY DECEMBER
4272 080.73463 79
INSTALL 100 FEET OF 2 INCH POLY ALONG HARRELL DRIVE. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL SOUTHLAKE GROWTH JUNE
MTX Additions
Page 128 of 178
347
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4273 080.73468 35,228
INSTALL 4400 FEET OF 6 INCH POLY ABANDON 4100 FEET OF 2 INCH POLY AND 300
FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY OCTOBER
4274 080.73472 27,141
INSTALL 8 REGULATOR STATIONS, AND ABANDON 8 REGULATOR STATIONS AT
THE FOLLOWING LOCATIONS, 1 IN EACH CARROLLTON, DALLAS, VAN ALSTYNE,
POTTSBORO AND 2 IN DENISON, AND 2 IN GAINSVILLLE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY MARCH
4275 080.73473 2,232
INSTALL FOUR TWO INCH MOONEY REGULATORS AND ONE 3 X 4 FLOW SAFE
RELIEF VALVE, REMOVE & ABANDON FOUR FISHER 399A REGULATORS & ONE 3
INCH GROVE 83 RELIEF VALVE IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY OCTOBER
4276 080.73474 658
INSTALL 618 FEET OF 4 INCH POLY ALONG THE STREETS OF GATES OF PROSPER.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL PROSPER GROWTH MARCH
4277 080.73479 7,590
INSTALL 2345 FEET OF 4 INCH STEEL AND ABANDON 992 FEET OF 2 INCH STEEL
AND 1802 FEET OF 3 INCH STEEL ALONG PINE STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE. ALL CUSTOMERS BRUCEVILLE EDDY SYSTEM INTEGRITY OCTOBER
4278 080.73480 3,344
ABANDON 28 DISTRICT REGULATOR STATIONS ALONG THE STREETS OF DALLAS IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4279 080.73481 22,239 PURCHASE A NEW IT MOBILE COMMAND CENTER FOR MID-TEX ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT JUNE
4280 080.73485 186
INSTALL 375 FEET OF 2 INCH POLY ALONG PARK VISTA BOULEVARD. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH MARCH
4281 080.73490 (8,538) INSTALL 2 INCH POLY ALONG NORTH BEACH STREET.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH JUNE
4282 080.73493 151,220
INSTALL 25 FEET OF 2 INCH AND 25 FEET OF 4 INCH POLY AND DISTRICT
REGULATOR STATION #08 ALONG PARKSIDE AND CROSBY AND ABANDON
DISTRICT REGUALATOR STATION AND 50 FEET OF 2 INCH POLY IN ACCORDANCE
WITH WITH THE RAILROAD COMMISSION OF TEXAS RULE OF 8.209. ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY SEPTEMBER
4283 080.73496 1,152
INSTALL 2845 FEET OF 4 INCH POLY AND 3725 FEET OF 2 INCH POLY ALONG THE
STREETS OF SENDERA RANCH EAST 23. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JUNE
4284 080.73497 536,934
RELOCATE FACILIITES.&NBSP; INSTALL 2,648 OF 4 INCH POLY ALONG THE ALLEY
OF BELMONT AVENUE AND ABANDON 811 FEET OF 2 INCH, 739 FEET OF 4 INCH,
AND 622 FEET OF 3 INCH, AND 76 FEET OF 8 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
4285 080.73499 80
INSTALL 778 FEET OF 4 INCH AND 180 FEET OF 2 INCH POLY ALONG ED SCHMIDT
TO SERVE HANSONS CORNER DISTRICT.
COMMERCIAL OR
INDUSTRIAL HUTTO GROWTH MARCH
4286 080.73505 855 INSTALL 425 FEET OF 4 INCH POLY ALONG TABOR PARKWAY.
COMMERCIAL OR
INDUSTRIAL KAUFMAN GROWTH JUNE
4287 080.73506 133
RELOCATE FACILITIES. INSTALL 512 FEET OF 4 INCH POLY AND ABANDON 515
FEET OF 4 INCH POLY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PROSPER
RELOCATION OF
FACILITIES APRIL
4288 080.73508 15,918
RELOCATE FACILITIES. INSTALL 180 FEET OF 2 INCH POLY ALONG GREENFIELD
ACRES AND ABANDON 160 FEET OF 2 INCH POLY TO ACCOMODATE CITY OF FORT
WORTH STORM DRAIN PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES DECEMBER
4289 080.73509 4,302
INSTALL 200 FEET OF 4 INCH POLY ALONG THE STREETS OF TRADITION SENIOR
LIVING FACILITY . DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH SEPTEMBER
4290 080.73514 867,568
INSTALL 2,274 FEET OF 8 INCH AND 184 FEET OF 4 INCH POLY ALONG ROCHELLE
ROAD AND MACARTHUR BOULEVARD AND ABANDON 1,411 FEET OF 8 INCH, 233
FEET OF 4 INCH, 73 FEET OF 3 INCH STEEL AND 159 FEET OF 4 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER
4291 080.73517 1,422,472
INSTALL 2,655 FEET OF 4 INCH, 970 FEET OF 2 INCH POLY ALONG CANADA DRIVE
AND ABANDON 1,884 FEET OF 6 INCH AND 729 FEET OF 2 INCH STEEL AND 660
FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4292 080.73521 (9,754) INSTALL 4 INCH POLY SERVICE ALONG ANDERSON ROAD.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH JUNE
4293 080.73522 12,199
INSTALL 529 FEET OF 6 INCH POLY ALONG GRANDBURY ROAD. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH SEPTEMBER
4294 080.73523 36,839
INSTALL 2100 FEET OF 8 INCH AND 1100 FEET OF 2 INCH POLY ALONG TRAIL LAKE
DRIVE AND ABANDON 2100 FEET OF 8 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4295 080.73524 48,693
INSTALL 1700 FT OF 2 INCH POLY ALONG STREETS OF COTTAGE OF MAGNOLIA
SUBDIVISION. RESIDENTIAL SHERMAN GROWTH JUNE
4296 080.73530 39,400
INSTALL 175 FEET OF 6 INCH POLY ALONG THE STREETS OF THE ANNA 455
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ANNA GROWTH DECEMBER
4297 080.73531 77,569
INSTALL 725 FEET OF 12 INCH POLY AND ABANDON 710 FEET OF 10 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4298 080.73537 210,733
INSTALL 4,420 FEET OF 2 INCH AND 2,175 FEET OF 4 INCH POLY ALONG THE
STREETS OF STUART RIDGE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH OCTOBER
4299 080.73555 (13)
INSTALL 1600 FEET OF 2 INCH AND 650 FEET OF 4 INCH POLY ALONG THE STREETS
OF HEARTLAND 18. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH JANUARY
4300 080.73557 220,657
INSTALL 900 FEET OF 8 INCH POLY ALONG THE STREETS OF DALLAS AND
ABANDON 900 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4301 080.73558 25,728
INSTALL 2,267 FEET OF 2 INCH POLY ALONG STREETS OF GRAND PRAIRIE AND
ABANDON 339 FEET OF 4 INCH AND 1,938 FEET OF 2 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
4302 080.73560 5,343
INSTALL 3,346 FEET OF 6 INCH POLY ALONG CARTER EAST INDUSTRIAL PARK IN
TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH SEPTEMBER
4303 080.73562 1,015
INSTALL 2510 FEET OF 2 INCH POLY ALONG THE STREETS OF BAR C RANCH
PHASE 5. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH MARCH
4304 080.73574 6,050
INSTALL 310 FEET OF 6 INCH POLY ALONG CEDAR AND ABANDON 297 FEET OF 6
INCH CAST IRON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
4305 080.73575 522,674
RELOCATE FACILITIES. INSTALL 1,848 FEET OF 4 INCH POLY ALONG PARK STREET
AND ABANDON 1,067 FEET OF 2 INCH AND 925 FEET OF 4 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4306 080.73576 8,973
INSTALL 1415 FEET OF 2 INCH POLY MAPLE STREET AND PINE STREET AND
ABANDON 3270 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLENN HEIGHTS SYSTEM INTEGRITY OCTOBER
4307 080.73579 792,340
RELOCATE FACILIITIES. INSTALL 1,345 FEET OF 2 INCH, 2,925 FEET OF 6 INCH, 21
FEET OF .75 INCH ALONG ALTA MESA BOULEVARD AND ABANDON 950 FEET OF
1.25 INCH, 107 FEET OF 2 INCH POLY AND 2,900 FEET OF 6 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JULY
4308 080.73581 1,079
INSTALL DISTRICT REGULATOR STATION 66, 40 FEET OF 2 INCH, 40 FEET OF 4 INCH
POLY IN SAN ANGELO AND ABANDON DISTRICT REGULATOR STATION 20, DISTRICT
REGULATOR STATION 66, 60 FEET OF 2 INCH STEEL, 15 FEET OF 2 INCH POLY, 10
FEET OF 4 INCH STEEL AND 40 FEET OF 4 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
4309 080.73586 5,066
INSTALL 2205 FEET OF 2 INCH POLY ALONG ORANGE STREET AND ABANDON 185
FEET OF 2 INCH POLY, 395 FEET OF 3 INCH POLY, 1760 FEET OF 2 INCH STEEL
AND DISTRTICT REGULATOR STATION 071 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
4310 080.73587 439,884
RELOCATE FACILITIES.
INSTALL 1,691 FEET OF 4 INCH POLY ALONG PARK STREET AND ABANDON 764
FEET OF 3 INCH, 481 FEET OF 4 INCH, 245 FEET OF 2 INCH POLY AND 120 FEET OF
2 INCH STEEL,, 55 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
4311 080.73589 1,320
INSTALL 276 FEET OF 2 INCH POLY AND ABANDON 381 FEET OF 2 INCH STEEL
ALONG COTTAGE GROVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SUNSET SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 129 of 178
348
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4312 080.73591 872
INSTALL 1488 FEET OF 4 INCH, 1579 FEET OF 2 INCH POLY ALONG THE STREETS
OF TAVOLO PARK SUBDIVISION. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH JUNE
4313 080.73592 318,371
RELOCATE FACILITIES. INSTALL 1,296 FEET OF 4 INCH POLY ALONG GRAND AVE
AND ABANDON 745 FEET OF 4 INCH STEEL, 568 FEET OF 4 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
4314 080.73593 69,467
INSTALL 642 FEET OF 4 INCH POLY AND 1926 FEET OF 2 INCH POLY ALONG
STREETS OF GRAND PRAIRIE AND ABANDON 779 FEET OF 4 INCH STEEL AND 1273
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSIN OF TEXAS
RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
4315 080.73596 (43,324)
RELOCATE FACILITIES. INSTALL 1500 FEET OF 6 INCH STEEL AND ABANDON 900
FEET OF 6 INCH STEEL ALONG NORTH OF VICTORY CIRCLE TO ACCOMMODATE A
DEVELOPER PROJECT. ALL CUSTOMERS NORTHLAKE
RELOCATION OF
FACILITIES SEPTEMBER
4316 080.73601 (13,188) INSTALL 230 FEET OF 4 INCH POLY ALONG STREETS OF WALMART. ALL CUSTOMERS DALLAS
SYSTEM
IMPROVEMENT JULY
4317 080.73602 20,896
REPLACE 105 STEEL SERVICE LINES IN CORSICANA IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
4318 080.73605 67,869
REPLACE 108 STEEL SERVICE LINES IN CORSICANA IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
4319 080.73614 15,014
RELOCATE FACILITIES. INSTALL 1364 FEET OF 4 INCH POLY ALONG MCFARLAND
STREET AND ABANDON 902 FEET OF 4 INCH POLY, 215 FEET OF 3 INCH STEEL TO
ACCOMODATE THE CITY OF KERRVILLE STREET IMPROVMENT PROJECT. ALL CUSTOMERS KERRVILLE
RELOCATION OF
FACILITIES OCTOBER
4320 080.73616 26,015
INSTALL 207 POLY SERVICE LINES AND ABANDON 207 STEEL SERVICE LINES IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
4321 080.73618 33,004
INSTALL 1115 FEET OF 2 INCH POLY AND 870 FEET OF 4 INCH POLY ALONG
STREETS OF HILLSBORO AND ABANDON 770 FEET OF 2 INCH STEEL, 715 FEET OF 4
INCH STEEL, 155 FEET OF 4 INCH POLY AND 362 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
4322 080.73620 18,273
REPLACE 103 STEEL SERVICE LINES IN BRYAN IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
4323 080.73625 27,392 INSTALL 3780 FEET OF 4 INCH AND 12,900 FEET OF 8 INCH POLY ALONG FM2757. ALL CUSTOMERS CRANDALL GROWTH OCTOBER
4324 080.73626 455,764
RELOCATE FACILITIES. INSTALL 2630 FEET OF 2 INCH POLY ALONG CLINTON
AVENUE AND ABANDON 4315 FEET OF 2 INCH AND 125 FEET OF 1.25 INCH STEEL
AND 380 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4325 080.73629 922
INSTALL 1075 FEET OF 4 INCH AND 2160 FEET OF 4 INCH POLY ALONG THE
STREETS OF SENDERA RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JULY
4326 080.73634 1,879
INSTALL 204 FEET OF 2 INCH POLY ALONG SLOAN STREET. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL WHITESBORO GROWTH MARCH
4327 080.73639 214
INSTALL 722 FEET OF 4 INCH POLY ALONG STREETS IN JOSHUA. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL JOSHUA GROWTH MARCH
4328 080.73641 3,115
RELOCATE FACILITIES. INSTALL 260 FEET OF 2 INCH POLY AND ABANDON 250
FEET OF 2 INCH POLY ALONG FOREST PARK BOULEVARD TO ACCOMODATE THE
CITY OF FORT WORTH STREET IMPROVMENT PROJECT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4329 080.73644 8,627
INSTALL 2020 FEET OF 6 INCH POLY ALONG MARTIN STREET AND ABANDON 2048
FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILOAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4330 080.73645 4,709
INSTALL 2045 FEET OF 4 INCH AND 2960 FEET OF 2 INCH POLY ALONG THE
STREETS OF NORTHGLEN SUBDIVISION. RESIDENTIAL HASLET GROWTH APRIL
4331 080.73651 711
REPLACE RELIEF VALVE ON DISTRICT REGULATOR STATION 24 ALONG SIBLEY
AND HOLLIDAY STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
4332 080.73654 34,285
INSTALL 2200 FEET OF 4 INCH POLY AND 150 FEET OF 8 INCH STEEL CASING
ALONG WEST ROUND GROVE ROAD.
COMMERCIAL OR
INDUSTRIAL LEWISVILLE GROWTH JULY
4333 080.73655 910,908
INSTALL 2,050 FEET OF 2 INCH AND 887 FEET OF 4 INCH POLY ALONG THE
STREETS OF CITY OF WACO AND ABANDON 1,960 FEET OF 3 INCH AND 820 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE
8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
4334 080.73657 584,394
INSTALL 765 FEET 2 INCH AND 1,955 FEET OF 4 INCH POLY ALONG N. 46TH STREET
AND ABANDON 1,010 FEET OF 2 INCH AND 2,295 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
4335 080.73662 112,365
INSTALL 2,510 FEET OF 2 INCH POLY ALONG THE STREETS OF PLANO GATEWAY
TOWNHOMES. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PLANO GROWTH DECEMBER
4336 080.73663 149,310
INSTALL 300 FEET OF 6 INCH AND 500 FEET OF 4 INCH OF POLY ALONG THE
STREETS OF PLANO GATEWAY TOWNHOMES. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PLANO GROWTH DECEMBER
4337 080.73664 13,220
INSTALL DISTRICT REGULATOR STATION 03, 04, 07 ALONG COMMERCE STREET,
345 FEET OF 4 INCH POLY, 225 FEET OF 2 INCH POLY AND ABANDON DISTRICT
REGULATOR STATION 03, 04, 07, 105 FEET OF 2 INCH STEEL, 40 FEET OF 3 INCH
STEEL, 40 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HONEY GROVE SYSTEM INTEGRITY OCTOBER
4338 080.73665 9,285
INSTALL 1,866 FEET OF 4 INCH AND 1,681 FEET OF 2 INCH POLY ALONG THE
STREETS OF MALLOW ROAD AND BLUEWOOD BEND. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL LEANDER GROWTH JULY
4339 080.73666 29,192
INSTALL 1,122 FEET OF 6 INCH, 2,683 FEET OF 4 INCH AND 1,426 FEET OF 2 INCH
POLY ALONG THE STREETS OF BRIDGEHAVEN SUBDIVISION. DEVELOPER
INSTALLED FACILIITES. RESIDENTIAL GEORGETOWN GROWTH JULY
4340 080.73669 1,064
INSTALL 1396 FEET OF 8 INCH, 2507 FEET OF 4 INCH, AND 3070 FEET OF 2 INCH
POLY ALONG THE STREETS OF EMORY CROSSING SUBDIVISION. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH MARCH
4341 080.73671 437,050
INSTALL 2,800 FEET OF 2 INCH POLY ALONG THE STREETS OF SQUIRE PLACE AND
BEE STREET AND ABANDON 2,800 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY DECEMBER
4342 080.73672 200,174
RELOCATE FACILITIES. INSTALL 1,730 FEET OF 2 INCH POLY ALONG WEST MAIN
AND ABANDON 1,460 FEET OF 4 INCH, 200 INCH OF 3 INCH STEEL AND, 746 INCH OF
2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY JULY
4343 080.73673 5,757 RELOCATE FACILITIES. INSTALL 1500 FEET OF 4 INCH POLY ALONG 38TH STREET. ALL CUSTOMERS KILLEEN
RELOCATION OF
FACILITIES MARCH
4344 080.73678 316,227
RELOCATE FACILITIES. INSTALL 325 FEET OF 2 INCH, 1,600 FEET OF 6 INCH POLY
ALONG ALTA MESA BLVD AND ABANDON 1,575 FEET OF 6 INCH, 300 FEET OF 1.25
INCH, AND 8 FEET OF .75 INCH OF STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE OF 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JULY
4345 080.73689 22,662
INSTALL 1570 FEET OF 4 INCH POLY ALONG FAIRLANE AVENUE AND ABANDON 918
FEET OF 2 INCH POLY, 396 FEET OF 4 INCH STEEL AND 237 FEET OF 2 INCH STEEL
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4346 080.73694 3,115
INSTALL DISTRICT REGULATOR STATION 029 ALONG MAIN STREET AND ABANDON
DISTRICT REGULATOR STATION 029 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4347 080.73696 1 REPLACE MCKINNEY SIGN FOR THE MCKINNEY SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JANUARY
4348 080.73701 770,530
RELOCATE FACILITIES. INSTALL 2,500 FEET OF 2 INCH POLY ALONG BALLINGER
AND ABANDON 2,470 FEET OF 2 INCH POLY TO ACCOMODATE THE CITY OF
GARLAND WATER, DRAINAGE AND CONCRETE IMPROVEMENTS IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
4349 080.73703 160,439
RELOCATE FACILITIES. INSTALL 1,700 FEET OF 2 INCH POLY ALONG EAST 4TH AND
ABANDON 1,140 FEET OF 2 INCH POLY TO ACCOMODATE THE CITY OF JOSHUA IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JOSHUA SYSTEM INTEGRITY SEPTEMBER
4350 080.73706 15 INSTALL 100 FEET OF 4 INCH POLY ALONG SHADY GROVE ROAD. ALL CUSTOMERS GRAND PRAIRIE GROWTH JANUARY
MTX Additions
Page 130 of 178
349
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4351 080.73710 2,913
RELOCATE FACILITIES. INSTALL 50 FEET OF 2 POLY AND ABANDON 25 FEET OF 2
INCH POLY ALONG LENEL PLACE AND CLOVER LANE IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
4352 080.73711 (12,872) INSTALL 250 FEET OF 2 INCH POLY ALONG WATERLOO LAKE DRIVE. RESIDENTIAL DENISON GROWTH MARCH
4353 080.73715 445
INSTALL 1300 FEET OF 4 INCH POLY ALONG STREETS OF DFW 161 PARK
WAREHOUSE COMPLEX. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL IRVING GROWTH JUNE
4354 080.73716 18,280
INSTALL 1,400 FEET OF 6 INCH, AND 10 FEET OF 2 INCH POLY ALONG HARRY
MCKILLIOP BOULEVARD IN MCKINNEY, COLLLIN COUNTY. ALL CUSTOMERS MCKINNEY GROWTH DECEMBER
4355 080.73718 5,777
INSTALL 1,760 FEET OF 2 INCH POLY ALONG HARRY MCKILLOP BOULEVARD AND
COUCH DRIVE IN MCKINNEY, COLLIN COUNTY.
COMMERCIAL OR
INDUSTRIAL MCKINNEY GROWTH DECEMBER
4356 080.73720 16,628
INSTALL 1555 FEET OF 4 INCH POLY ALONG TRENTMAN STREET AND ABANDON
1452 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4357 080.73721 (14,865) INSTALL 725 FEET OF 4 INCH POLY ALONG STATE HIGHWAY 31 IN CORSICANA.
COMMERCIAL OR
INDUSTRIAL CORSICANA GROWTH JULY
4358 080.73728 84
INSTALL 220 FEET OF 6 INCH POLY ALONG NORTH GATE DRIVE. DEVELOPER
INSTALLED FACILITIES. ALL CUSTOMERS IRVING GROWTH MARCH
4359 080.73729 7,336
INSTALL 1320 FEET OF 2 INCH POLY ALONG 10TH STREET AND ABANDON 1200
FEET OF 2 INCH, 353 FEET OF 3 INCH AND 47 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA SYSTEM INTEGRITY OCTOBER
4360 080.73730 8,573
RELOCATE FACILITIES. INSTALL 500 FEET OF 4 INCH POLY AND 100 FEET OF 2
INCH POLY AND ABANDON 500 FEET OF 3 INCH STEEL AND 100 FEET OF 2 INCH
STEEL ALONG PREVOST TO ACCOMODATE THE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4361 080.73732 6,067
INSTALL 150 FEET OF 4 INCH AND 450 FEET OF 2 INCH POLY ALONG SOUTH 14TH
AND PEACH AND ABANDON 462 FEET OF 4 INCH STEEL AND 64 FEET OF 4 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
4362 080.73733 (22)
INSTALL 75 FEET OF 2 INCH IP POLY ALONG FREEMAN AVE TO SERVE NEW
RESIDENTIAL CUSTOMER. RESIDENTIAL BRYAN GROWTH JANUARY
4363 080.73735 26,177 INSTALL 585 FEET OF 4 INCH POLY SERVICE ALONG HUNTER LANE.
COMMERCIAL OR
INDUSTRIAL GRAND PRAIRIE GROWTH JUNE
4364 080.73736 (3)
INSTALL 200 FEET OF 2 INCH POLY ALONG STREETS OF HEARTLAND PHASE 10A.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH JANUARY
4365 080.73739 11,316 INSTALL 1450 FEET OF 4 INCH POLY ALONG STREETS OF WALMART.
COMMERCIAL OR
INDUSTRIAL MANSFIELD GROWTH OCTOBER
4366 080.73741 13,409
INSTALL 1,200 FEET OF 4 INCH POLY AND ABANDON 3 INCH STEEL ALONG
MACARTHUR DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
4367 080.73745 1,005,176
INSTALL 3,600 FEET OF 2 INCH AND 256 FEET OF 4 INCH POLY ALONG CAMP DRIVE
AND GRICE STRET IN WACO AND ABANDON 3,415 FEET OF 2 INCH AND 278 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
4368 080.73748 820,097
INSTALL 9,626 FEET OF 2 INCH AND 760 FEET OF 4 INCH POLY ALONG THE STREET
OF VENETIAN AT WESTON SUBDIVISION IN MCKINNEY, COLLIN COUNTY. RESIDENTIAL MCKINNEY GROWTH DECEMBER
4369 080.73749 (26,764) INSTALL 50 FEET OF 6 INCH POLY ALONG MONTFORD ROAD.
COMMERCIAL OR
INDUSTRIAL DALLAS GROWTH JUNE
4370 080.73750 2,275 INSTALL 100 FEET OF 2 INCH POLY ALONG OBERMAN LANE. RESIDENTIAL SHADY SHORES GROWTH SEPTEMBER
4371 080.73751 439,842
INSTALL 3,800 FEET OF 4 INCH AND 10,000 FEET OF 2 INCH POLY ALONG THE
STREETS OF POLO RIDGE SUBDIVISION IN CRANDALL, KAUFMAN COUNTY.
DEVELOPER INSTALLED FACILITY. RESIDENTIAL CRANDALL GROWTH DECEMBER
4372 080.73753 996,097
INSTALL 700 FEET OF 2 INCH, 375 FEET OF 4 INCH, 3,250 FEET OF 6 INCH POLY
ALONG SOUTH HULEN STREET AND ABANDON 25 FEET OF 2 INCH POLY, 750 FEET
OF 2 INCH, 110 FEET OF 4 INCH AND 2,950 FEET OF 6 INCH STEEL IN ACCORDANCE
WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
4373 080.73755 514,405
RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH, 2,525 FEET OF 4 INCH POLY
ALONG WHISTLER DRIVE AND ABANDON 280 FEET OF 1.25 INCH AND 2,500 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8,209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
4374 080.73756 10,197
INSTALL 3,665 FEET OF 2 INCH POLY ALONG THE STREETS OF LOST WOODS
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH SEPTEMBER
4375 080.73757 (162) INSTALL 80 FEET OF 2 INCH POLY ALONG CLAY STREET. RESIDENTIAL KERRVILLE GROWTH JANUARY
4376 080.73758 2,983
INSTALL 555 FEET OF 2 INCH POLY ALONG LAKELINE BOLUVARD. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL LEANDER GROWTH JUNE
4377 080.73759 14,654
INSTALL 3,702 FEET OF 4 INCH AND 2,865 FEET OF 2 INCH POLY ALONG THE
STREETS OF ROSENBUSCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JUNE
4378 080.73761 550,031
RELOCATE FACILITIES. INSTALL 2,475 FEET OF 6 INCH AND 20 FEET OF 4 INCH
POLY ALONG KELLER HICKS ROAD AND ABANDON 2,200 FEET OF 4 INCH AND 150
FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
4379 080.73763 (2)
INSTALL 1,775 FEET OF 2 INCH POLY ALONG SHADY LANE. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL SOUTHLAKE GROWTH JANUARY
4380 080.73765 16,005
INSTALL 760 FEET OF 2 INCH POLY ALONG THE STREETS OF BELAIR AND
ALEXANDRIA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WICHITA FALLS GROWTH JUNE
4381 080.73766 18,314
INSTALL 1,206 FEET OF 6 INCH, 3,453 FEET OF 4 INCH AND 3,589 FEET OF 2 INCH
POLY ALONG THE STREETS OF LISSO SUBDIVISION IN PFLUGERVILLE, TRAVIS
COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH DECEMBER
4382 080.73768 90,363
INSTALL 2,781 FEET OF 4 INCH, AND 5,676 FEET OF 2 INCH POLY ALONG THE
STREETS OF MUSTANG CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH DECEMBER
4383 080.73769 18,709
INSTALL 865 FEET OF 4 INCH POLY ALONG THE STREETS OF UNT ART STUDIO.
DEVLOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL DENTON GROWTH DECEMBER
4384 080.73770 76,099 INSTALL 730 FEET OF 4 INCH POLY ALONG THE STREETS OF THE COMMONS BLVD. ALL CUSTOMERS SACHSE GROWTH JUNE
4385 080.73771 499,108
INSTALL 616 FEET OF 4 INCH AND 3,276 FEET OF 2 INCH POLY ALONG THE
STREETS OF PARKSDIE VILLAGE SUBDIVISION IN LEANDER, WILLIAMSON
COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
4386 080.73773 42,715
INSTALL 1914 FEET OF 4 INCH POLY ALONG MARTIN STREET AND ABANDON 1360
FEET OF 6 INCH POLY, 742 FEET OF 4 INCH POLY AND 214 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4387 080.73774 5,999
INSTALL 2,340 FEET OF 4 INCH AND 2,314 FEET OF 2 INCH POLY ALONG THE
STREETS OF BRIDGEHAVEN SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER
4388 080.73775 81,496
INSTALL 900 FEET OF 2 INCH POLY ALONG THE STREETS OF THE 5 MILE HOMES
SUBDIVISION. RESIDENTIAL DALLAS GROWTH JULY
4389 080.73776 6,163
INSTALL 1900 FEET OF 2 INCH IP POLY ALONG COOKS LANE AND ABANDON 3922
OF 8 INCH TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4390 080.73777 33,046
INSTALL 1,000 FEET OF 6 INCH POLY ALONG EAST BARDIN ROAD. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL ARLINGTON GROWTH DECEMBER
4391 080.73784 4,176
RELOCATE FACILITIES. INSTALL 1583 FEET OF 2 INCH POLY ALONG EAST WARREN
STREET AND ABANDON 1234 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
HEWITT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEWITT
RELOCATION OF
FACILITIES OCTOBER
4392 080.73786 630
INSTALL 300 FEET OF 2 INCH POLY ALONG BEN MILAM DRIVE AND ABANDON 300
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE SYSTEM INTEGRITY OCTOBER
4393 080.73787 1,722
INSTALL 875 FEET OF 2 INCH POLY ALONG WEST MUNSON AND ABANDON 470 OF 4
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 131 of 178
350
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4394 080.73793 461,347
INSTALL 1,900 FEET OF 4 INCH AND 1,200 FEET OF 2 INCH POLY AND 200 FEET OF 8
INCH STEEL CASING. ABANDON 1,900 FEET OF 4 INCH AND 1,200 FEET OF 2 INCH
STEEL ALONG RICHLAND AVENUE AND BEE STREET IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY DECEMBER
4395 080.73797 563
INSTALL 7400 FEET OF 2 INCH POLY AND 1050 FEET OF 4 INCH POLY ALONG THE
STREETS OF LAKEPOINTE PHASE 2A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LAVON GROWTH DECEMBER
4396 080.73801 360
INSTALL 1850 FEET OF 2 INCH AND 1300 FEET OF 4 INCH POLY ALONG THE
STREETS OF LAKEPOINTE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LAVON GROWTH OCTOBER
4397 080.73803 13,484
INSTALL DISTRICT REGULATOR STATION 03, 45 FEET OF 4 INCH POLY AND 45 FEET
OF 2 INCH POLY ALONG STREETS OF CRANDALL AND ABANDON DISTRICT
REGULATOR STATION 03, 7 FEET OF 3 INCH POLY, 15 FEET OF 2 INCH POLY AND 25
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CRANDALL SYSTEM INTEGRITY OCTOBER
4398 080.73806 13,505
REPLACE DRS14 AND INSTALL 25 FEET OF 2 INCH POLY AND 85 FEET OF 4 INCH
ABANDON 25 FEET OF 2 INCH POLY AND 85 FEET OF 4 INCH POLY ALONG EAST
LARKIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY OCTOBER
4399 080.73807 15,062
INSTALL DISTRICT REGULATOR STATION 02, 390 FEET OF 2 INCH POLY AND 115
FEET OF 4 INCH POLY ALONG SMITHE ROAD AND ABANDON 390 FEET OF 2 INCH
STEEL AND 115 FEET OF 3 INCH STEEL AND DISTRICT REGULATOR STATION 02 IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SCURRY SYSTEM INTEGRITY OCTOBER
4400 080.73809 10,753
INSTALL 40 FEET OF 4 INCH POLY, 60 FEET OF 2 INCH POLY AND DISTRICT
REGULATOR STATION 06 ALONG STREETS OF WYLIE AND ABANDON 55 FEET OF 4
INCH STEEL, 60 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 06 IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WYLIE SYSTEM INTEGRITY OCTOBER
4401 080.73810 528,724
INSTALL 300 FEET OF 2 INCH, 2,900 FEET OF 4 INCH POLY ALONG WHEELOCK
DRIVE IN FORT WORTH AND ABANDON 2,800 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4402 080.73814 3,487
RELOCATE FACILITIES. INSTALL 1130 FEET OF 2 INCH POLY AND ABANDON 1130
FEET OF 2 INCH STEEL ALONG BOOKER T STREET TO ACCOMMODATE CITY OF
FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4403 080.73817 28,824
RELOCATE FACILITIES. INSTALL 600 FEET OF 4 INCH, 600 FEET OF 2 INCH AND 75
FEET OF 6 INCH POLY ALONG SAYLE STREET AND ABANDON 525 FEET OF 4 INCH,
75 FEET OF 3 INCH POLY AND 75 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY
OF GREENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE
RELOCATION OF
FACILITIES DECEMBER
4404 080.73818 5,100,447
INSTALL 20,805 FEET OF 12 INCH POLY AND 257 FEET OF 16 STEEL ALONG THE
STREETS OF COUNTY RD 175, FM 455, WEST ST, MAIN ST, AND FM 543 IN WESTON,
COLLIN COUNTY. ALL CUSTOMERS CELINA GROWTH DECEMBER
4405 080.73822 88,950
INSTALL 300 FEET OF 6 INCH POLY ALONG CEDARDALE AT EAST ALTAMOORE IN
DALLAS, DALLAS COUNTY.
COMMERCIAL OR
INDUSTRIAL DALLAS GROWTH DECEMBER
4406 080.73823 59,070
INSTALL 3,525 FEET OF 2 INCH AND 3,165 FEET OF 4 INCH POLY ALONG THE
STREETS OF PRAIRIE OAKS IN OAK POINT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL OAK POINT GROWTH DECEMBER
4407 080.73826 718
INSTALL 2050 FEET OF 6 INCH POLY AND 2850 FEET OF 2 INCH POLY ALONG THE
STREETS OF TRAILSTONE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CADDO MILLS GROWTH APRIL
4408 080.73828 14,856
INSTALL 1926 FEET OF 6 INCH AND 5748 FEET OF 2 INCH POLY ALONG THE
STREETS OF HOMESTEAD SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
4409 080.73829 (267,397)
REPLACEMENT OF CABINETRY, COUNTERTOPS, DISHWASHER, AND ICE MACHINE
AT THE BRYAN SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES MARCH
4410 080.73831 15,727
INSTALL 1162 FEET OF 6 INCH, 2635 FEET OF 4 INCH, AND 3390 FEET OF 2 INCH
POLY ALONG THE STREETS OF COTTONWOOD CREEK SUBDIVISION. DEVLOPER
INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH JUNE
4411 080.73834 1,140
RELOCATE FACILITIES. INSTALL 40 FEET OF 4 INCH POLY ALONG WILLING AVENUE
AND ABANDON 40 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF FORT
WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4412 080.73835 2,714
INSTALL 1512 FEET OF 4 INCH POLY ALONG MOBERLY STREET AND ABANDON 1102
FEET OF 3 INCH STEEL AND 355 FEET OF 4 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4413 080.73837 57,236
INSTALL 2058 FEET OF 4 INCH POLY AND 273 FEET OF 2 INCH POLY ALONG
STREETS OF GRAND PRAIRIE AND ABANDON 497 FEET OF 4 INCH STEEL AND 1276
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
4414 080.73838 59,909
INSTALL 325 FEET OF 2 INCH POLY, 1200 FEET OF 4 INCH POLY AND 900 FEET OF 6
INCH POLY ALONG HURSTVIEW DRIVE AND ABANDON 325 FEET OF 2 INCH STEEL
AND 1985 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
4415 080.73839 525,940
INSTALL 2,568 FEET OF 4 INCH POLY AND ABANDON 132 FEET OF 3 INCH, 18 FEET
OF 4 INCH POLY, 111 FEET OF 3 INCH AND 2,899 FEET OF 4 INCH STEEL ALONG
REDBUD DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
4416 080.73840 493,633
RELOCATE FACILITIES. INSTALL 2,100 FEET OF 6 INCH POLY ALONG BUENA VISTA
DRIVE AND ABANDON 2,100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY SEPTEMBER
4417 080.73841 543,910
INSTALL 2,684 FEET OF 3 INCH POLY AND ABANDON 2,684 FEET OF STEEL ALONG
ANDERSON STREET IN ACCORDANCE WITH RAILROAD COMMISISON OF TEXAS
RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
4418 080.73842 245,087
INSTALL 2,710 FEET OF 2 INCH AND 400 FEET OF 6 INCH POLY AND ABANDON 1,870
FEET OF 2 INCH, 133 FEET OF 4 INCH POLY, 419 FEET OF 2 INCH AND 350 FEET OF
4 INCH STEEL ALONG HARMON ROAD IN ACCORDANCE WITH THE RAILROAD
COMMISSIOM OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
4419 080.73845 189,375
INSTALL 1,300 FEET OF 2 INCH POLY AND ABANDON 1,288 FEET OF 2 INCH POLY
ALONG HARMON ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
4420 080.73846 447,127
INSTALL 2,140 FEET OF 4 INCH POLY AND ABANDON 130 FEET OF 2 INCH POLY AND
977 FEET OF 3 INCH AND 1,357 FEET OF 4 INCH STEEL ALONG TREADWELL DRIVE
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
4421 080.73847 291,056
INSTALL 2,301 FEET OF 4 INCH POLY AND ABANDON 2,301 FEET OF 4 INCH STEEL
ALONG SIMMONS STREET IN HURST IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
4422 080.73848 369,429
INSTALL 1,350 FEET OF 2 INCH POLY ALONG RIDGECREST DRIVE AND POST OAK
DRIVE IN HURST AND ABANDON 213 FEET OF 2 INCH, 1,004 FEET OF 3 INCH AND
1,550 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
4423 080.73849 307,097
INSTALL 1,000 FEET OF 2 INCH AND 1,050 FEET OF 4 INCH POLY ALONG
CROSSTIMBER DRIVE AND ABANDON 370 FEET OF 2 INCH AND 2,264 FEET OF 4
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY OCTOBER
4424 080.73850 9,261
INSTALL DISTRICT REGULATOR STATION DRS01 ALONG THE STREETS OF N 6TH
STREET AND N 8TH STREET AND ABANDON DISTRICT REGULATOR STATION DRS01
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BUCKHOLTS SYSTEM INTEGRITY OCTOBER
4425 080.73852 2,865
RELOCATE FACILITIES. INSTALL 680 FEET OF 6 INCH POLY ALONG REMSCHEL
AVENUE AND ABANDON 670 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF
KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDACE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
RELOCATION OF
FACILITIES OCTOBER
4426 080.73853 976
RELOCATE FACILITIES. INSTALL 145 FEET OF 2 INCH POLY ALONG C STREET AND
ABANDON 3/4 INCH POLY SERVICE IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 132 of 178
351
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4427 080.73855 156,728
INSTALL 1,240 FEET OF 3 INCH POLY ALONG CHAPMAN DRIVE IN LANCASTER.
DEVELOPER INSTALLED FACILIITES. ALL CUSTOMERS LANCASTER GROWTH OCTOBER
4428 080.73856 161,481
INSTALL 960 FEET OF 4 INCH AND 4,415 FEET OF 2 INCH POLY ALONG STREETS OF
PLEASANT RUN ESTATES IN THE CITY OF LANCASTER. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL LANCASTER GROWTH JULY
4429 080.73859 343,010
RELOCATE FACILITIES. INSTALL 2,000 FEET OF 4 INCH POLY ALONG WRIGLEY WAY
AND ABANDON 1,950 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
4430 080.73864 478,639
INSTALL ENCIRCLEMENTS ON 9 DENTS ALONG LINE P7 IN ROUND ROCK DUE TO ILI
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AUSTIN SYSTEM INTEGRITY OCTOBER
4431 080.73865 530,661
INSTALL 2,201 FEET OF 4 INCH POLY ALONG THE STREETS OF NW 16TH IN FORT
WORTH AND ABAONDON 764 FEET OF 4 INCH AND 394 FEET OF 6 INCH STEEL AND
669 FEET OF 3 INCH AND 371 FEET OF 2 INCH POLY IN ACCORDANCE WITH TEXAS
RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
4432 080.73869 13,743
INSTALL 2431 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKES AT LEGACY
SUBDIVSION. RESIDENTIAL PROSPER GROWTH JULY
4433 080.73871 1,985
INSTALL 700 FEET OF 4 INCH POLY ALONG WEST VISTA RIDGE MALL AND
HIGHWAY 121.
COMMERCIAL OR
INDUSTRIAL LEWISVILLE GROWTH MARCH
4434 080.73872 99,244
INSTALL DISTRICT REGULATOR STATION #01 IN THE CITY OF ROSEBUD AND
ABANDON DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSEBUD SYSTEM INTEGRITY SEPTEMBER
4435 080.73876 (7,360)
RELOCATE FACILITIES. INSTALL 245 FEET OF 2 INCH POLY ALONG HARRY HINES
NEAR HUNT STREET IN DALLAS AND ABANDON 245 FEET OF 2 INCH POLY. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
4436 080.73877 2,446
RELOCATE FACILITIES. INSTALL 13 POLY SERVICES AND ABANDON 13 POLY
SERVICES TO ACCOMMODATE CITY OF CARROLLTON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CARROLLTON
RELOCATION OF
FACILITIES OCTOBER
4437 080.73883 268,557
INSTALL 2,250 FEET OF 2 INCH POLY ALONG WILTON DRIVE IN FORT WORTH AND
ABANDON 1,875 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
4438 080.73884 5,668
INSTALL 2,629 FEET OF 2 INCH POLY ALONG THE STREETS OF GREAT LAWN BEN
AND LOTTI LANE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER
4439 080.73885 41,972
ABANDON 760 FEET OF 1.25 INCH, 130 FEET OF 2 INCH AND 110 FEET OF 2 INCH
POLY WITH 980 FEET OF 2 INCH POLY ALONG IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4440 080.73886 41,134 INSTALL 35 FEET OF 4 INCH POLY SERVICE ALONG WENDLAND ROAD.
COMMERCIAL OR
INDUSTRIAL TEMPLE GROWTH SEPTEMBER
4441 080.73890 3,652
INSTALL 1517 FEET OF 4 INCH POLY AND 730 FEET OF 2 INCH POLY ALONG
TRENTMAN STREET AND ABANDON 965 FEET OF 4 INCH STEEL, 610 FEET OF 2
INCH STEEL, 522 FEET OF 4 INCH POLY AND 84 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4442 080.73892 408,686
INSTALL 2,750 FEET OF 2 INCH POLY AND ABANDON 2,725 FEET OF 2 INCH STEEL
ALONG THE STREETS OF WHITMAN AVE IN FORT WORTH IN ACCORDANCE WITH
TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
4443 080.73893 5,761
RELOCATE FACILITIES. INSTALL 1100 FEET OF 2 INCH POLY ALONG PAUL COURT
AND ABANDON 500 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
RICHARDSON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
RELOCATION OF
FACILITIES OCTOBER
4444 080.73895 690,507
RELOCATE FACILITIES. INSTALL 1,885 FEET OF 2 INCH, 1,180 FEET OF 4 INCH OF
POLY ALONG GOULD ST AND ABANDON 601 FEET OF 1.25 INCH POLY AND, 351
FEET OF 2 INCH, 278 FEET OF 3 INCH STEEL, 1202 FEET OF 4 INCH POLY, 872 FEET
OF 4 INCH AND 428 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
4445 080.73896 145,624
RELOCATE FACILIITIES. INSTALL 1,400 FEET OF 2 INCH POLY ALONG WEST BOWIE
AND ABANDON 1,540 ON 2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD
COMMISSION RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY DECEMBER
4446 080.73897 3,901
INSTALL 500 FEET OF 4 INCH POLY ALONG LOOP 254 AND ABANDON 500 FEET OF 4
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER SYSTEM INTEGRITY OCTOBER
4447 080.73900 50,527
INSTALL 350 FEET OF 4 INCH, 70 FEET OF 4 INCH SERVICE AND METER
INSTALLATION.
COMMERCIAL OR
INDUSTRIAL ABILENE GROWTH SEPTEMBER
4448 080.73903 523,110
INSTALL 3,425 FEET OF 2 INCH POLY ALONG WINIFRED DRIVE IN FORT WORTH
AND ABANDON 3,325 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
4449 080.73908 28,489
INSTALL 1586 FEET OF 4 INCH AND 715 FEET OF 2 INCH POLY ALONG STREETS OF
GRAND PRAIRIE AND ABANDON 1529 FEET OF 4 INCH AND 973 FEET OF 2 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
4450 080.73914 16,944
INSTALL DISTRICT REGULATOR STATION, 25 FEET OF 2 INCH POLY AND 25 FEET OF
4 INCH POLY ALONG STREETS OF KEMP AND ABANDON DISTRICT REGULATOR
STATION 06, 25 FEET OF 3 INCH STEEL AND 25 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEMP SYSTEM INTEGRITY DECEMBER
4451 080.73915 3 INSTALL 265 FEET OF 2 INCH POLY ALONG LYNN WAY. RESIDENTIAL WAXAHACHIE GROWTH JANUARY
4452 080.73916 1,616
INSTALL 440 FEET OF 2 INCH POLY ALONG JUDY STREET AND ABANDON 440 FEET
OF 2 INCH BARE STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WHITEHOUSE SYSTEM INTEGRITY OCTOBER
4453 080.73929 93,805
INSTALL 2,800 FEET OF 6 INCH POLY, 120 FEET OF 8 INCH STEEL ALONG HIGHWAY
84. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MC GREGO GROWTH DECEMBER
4454 080.73934 633,776
INSTALL 3,300 FEET OF 2 INCH, 2,500 FEET OF 4 INCH AND 1,400 FEET OF 6 INCH
POLY ALONG THE STREETS OF BRIDGEWATER SUBDIVISION IN MIDLOTHIAN, ELLIS
COUNTY. RESIDENTIAL MIDLOTHIAN GROWTH DECEMBER
4455 080.73938 3,088
RELOCATE FACILITIES. INSTALL 762 FEET OF 2 INCH POLY ALONG FM 932 AND
ABANDON 355 FEET OF 2 INCH STEEL AND 390 FEET OF 2 INCH POLY TO
ACCOMODATE TXDOT PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HAMILTON
RELOCATION OF
FACILITIES OCTOBER
4456 080.73941 585,159
RELOCATE FACILITIES. INSTALL 3,200 FEET OF 2 INCH POLY ALONG MAIN AND
ABANDON 442 FEET OF 2 INCH POLY, 750 FEET OF 2 INCH STEEL, 653 FEET OF 3
INCH STEEL, 263 FEET OF 4 INCH POLY AND 1092 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY SEPTEMBER
4457 080.73942 432
RELOCATE FACILITIES. INSTALL 25 FEET OF 2 INCH ALONG DUNN STREET AND
ABANDON 10 FEET OF 2 INCH IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE
RELOCATION OF
FACILITIES OCTOBER
4458 080.73948 1,654
ABANDON 490 FEET OF 3 INCH STEEL ALONG STREETS OF KEMP IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEMP SYSTEM INTEGRITY OCTOBER
4459 080.73950 132,106
INSTALL 400 FEET OF 4 INCH STEEL AND 20 FEET OF 16 INCH STEEL ALONG LINE
CA6-1 AND ABANDON 400 FEET OF 4 INCH STEEL AND 20 FEET OF 16 INCH STEEL
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
4460 080.73952 11,788
INSTALL 1845 FEET OF 2 INCH POLY AND 668 FEET OF 4 INCH POLY ALONG
BROOKLINE AVENUE AND ABANDON 1703 FEET OF 3 INCH STEEL, 421 FEET OF 2
INCH STEEL, 180 FEET OF 2 INCH POLY AND 22 FEET OF 4 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4461 080.73953 1,320
INSTALL 309 FEET OF 4 INCH AND 1799 FEET OF 2 INCH POLY ALONG THE STREETS
OF CARLSON PLACE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH MARCH
4462 080.73954 862
INSTALL 2240 FEET OF 4 INCH AND 1032 FEET OF 2 INCH POLY ALONG THE
STREETS OF CARLSON PLACE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH MARCH
4463 080.73955 (35,861)
INSTALL 2930 FEET OF 4 INCH POLY AND 4655 FEET OF 2 INCH POLY ALONG THE
STREETS OF CIBOLO HILLS SUBDIVSION. RESIDENTIAL FORT WORTH GROWTH JULY
4464 080.73957 48
INSTALL 300 FEET OF 2 INCH POLY TO SERVE 3 RESIDENTIAL CUSTOMERS ON
SKINNEY DRIVE. RESIDENTIAL SWEETWATER GROWTH MARCH
MTX Additions
Page 133 of 178
352
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4465 080.73959 62,211
INSTALL 3350 FEET OF 2 INCH POLY ALONG STREETS OF DETROIT AND ABANDON
1715 FEET OF 3 INCH STEEL, 460 FEET OF 2 INCH STEEL, 355 FEET OF 2 INCH POLY
AND DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DETROIT SYSTEM INTEGRITY DECEMBER
4466 080.73965 601,686
INSTALL 1,083 FEET OF 4 INCH AND 1,544 FEET OF 2 INCH POLY ALONG THE
STREETS OF GRAND PRAIRIE AND ABANDON 1,443 FEET OF 4 INCH AND 573 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY JULY
4467 080.73967 390,702
INSTALL 6,210 FEET OF 2 INCH AND 5,250 FEET OF 4 INCH POLY ALONG THE
STREETS OF SANDBROCK RANCH SUBDIVISION IN THE CITY OF AUBREY. RESIDENTIAL AUBREY GROWTH DECEMBER
4468 080.73969 (38) INSTALL 1,097 FEET OF 4 INCH POLY ALONG EVERMAN PARKWAY BUSINESS PARK.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH MARCH
4469 080.73971 169 INSTALL 1375 FEET OF 4 INCH POLY ALONG DOWNING DRIVE INDUSTRIAL PARK.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH MARCH
4470 080.73972 377,386
RELOCATE FACILITIES. INSTALL 2,617 FEET OF 4 INCH POLY ALONG E. FAIRFAX
AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
4471 080.73973 71,309 INSTALL 725 FEET OF 4 INCH POLY ALONG UPTOWN BOULEVARD.
COMMERCIAL OR
INDUSTRIAL CEDAR HILL GROWTH DECEMBER
4472 080.73977 23,945
INSTALL 1,975 FEET OF 2 INCH POLY ALONG THE STREETS OF GREENBRIER.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH JUNE
4473 080.73978 76
REPLACE RELIEF VALVE ON DRS92 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY OCTOBER
4474 080.73979 28,791
RELOCATE FACILITIES.
INSTALL 40 FEET OF 4 INCH POLY ALONG COOPER LANE AND ABANDON 40 FEET
OF 4 INCH POLY TO ACCOMMODATE THE CITY OF JOSHUA IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JOSHUA SYSTEM INTEGRITY SEPTEMBER
4475 080.73983 542,040
INSTALL 1,200 FEET OF 4 INCH AND 2,450 FEET OF 2 INCH POLY ALONG
HAVENHURST STREET AND GOODLAND STREET IN FARMER BRANCH AND
ABANDON 1,200 FEET OF 4 INCH AND 2,450 FEET 2 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY DECEMBER
4476 080.73984 159,725
INSTALL 4600 FEET OF 2 INCH AND 275 FEET OF 4 INCH POLY ALONG HIGHBRIDGE
BOULEVARD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH SEPTEMBER
4477 080.73988 543,449
INSTALL 3,300 FEET OF 2 INCH POLY ALONG RICHLAND AVENUE AND DENNIS LANE
IN FARMERS BRANCH AND ABANDON 3,300 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY OCTOBER
4478 080.73991 19,675
INSTALL 807 FEET OF 8 INCH, 1,554 FEET OF 4 INCH AND 2,621 FEET OF 2 INCH
POLY ALONG THE STREETS OF WOLF RANCH SUBDIVISION. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER
4479 080.73994 431,511
RELOCATE FACILITIES. INSTALL 1,275 FEET OF 4 INCH, AND 1,367 FEET OF 2 INCH
POLY ALONG GRAND PRAIRIE NEIGHBORHOOD AND ABANDON 1,191 FEET OF 4
INCH STEEL, 1,025 FEET OF 2 INCH POLY IN ACCORDDANCE WITH THE RAILROAD
COMMISSION OF TEXAS 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY JULY
4480 080.73997 14,170
INSTALL 250 FEET OF 8 INCH POLY AND ABANDON 250 FEET OF 8 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4481 080.74000 213,961
RELOCATE FACILIITIES. INSTALL 2,362 FEET OF 4 INCH POLY ALONG ROCKWALL
STREET AND ABANDON DISTRICT REGULATOR STATION #05 AND 576 FEET OF 2
INCH STEEL, 7 FEET OF 3 INCH STEEL, 898 FEET OF 4 INCH STEEL, 10 FEET OF 2
INCH POLY, 637 FEET OF 3 INCH POLY, 63 FEET OF 4 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSON OF TEXAS RULE 8,209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY JUNE
4482 080.74002 16,368
INSTALL 830 FEET OF 4 INCH POLY AND 840 FEET OF 2 INCH POLY ALONG
STREETS OF TERRELL AND ABANDON 908 FEET OF 2 INCH STEEL, 778 FEET OF 2
INCH POLY AND DISTRICT REGULATOR STATION 15 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY OCTOBER
4483 080.74003 950,565
INSTALL 2,200 OF 2 INCH POLY ALONG NORTH COLLEGE STREET AND ABANDON
2,000 FEET OF 2 INCH, 3 INCH, AND 4 INCH STEEL AND 6 INCH STEEL AND
WAXAHACHIE DISTRICT REGULATOR STATION #15 IN ACCORDANCE WITH&NBSP;
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY DECEMBER
4484 080.74004 52 INSTALL 160 FEET OF 4 INCH POLY ALONG INDUSTRIAL BOULEVARD.
COMMERCIAL OR
INDUSTRIAL EULESS GROWTH MARCH
4485 080.74005 716
INSTALL 400 FEET OF 2 INCH POLY ALONG BENNETT STREET AND ABANDON
DISTRICT REGULATOR STATION 7 AND 400 FEET OF 3 INCH STEEL AND 30 FEET OF
2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DETROIT SYSTEM INTEGRITY OCTOBER
4486 080.74007 (12)
INSTALL 600 FEET OF 2 INCH POLY ALONG STREETS OF MIDPARK OFFICE PARK.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL MIDLOTHIAN GROWTH MARCH
4487 080.74008 13,798
INSTALL 3,490 FEET OF 8 INCH, 481 FEET OF 4 INCH AND 835 FEET OF 2 INCH POLY
ALONG THE STREETS OF BUTLER FARMS SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER
4488 080.74009 468,978
INSTALL 75 FEET OF 6 INCH, 2,450 FEET OF 4 INCH, 300 FEET OF 2 INCH POLY
ALONG THE STREETS OF KINGWOOD DRIVE AND ABANDON 55 FEET OF 6 INCH,
2,325 FEET OF 4 INCH STEEL, AND 200 FEET OF 2 INCH POLY IN ACCORDANCE
WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
4489 080.74011 845,107
INSTALL 2,365 FEET OF 2 INCH, 1,646 FEET OF 4 INCH POLY ALONG THE STREETS
OF HUBBY AND WATT AVENUE AND ABANDON 800 FEET OF 4 INCH STEEL AND
1,155 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISISON
OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
4490 080.74015 9,652
INSTALL 1,546 FEET OF 4 INCH AND 4,391 FEET OF 2 INCH POLY ALONG THE
STREETS OF BUTLER FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER
4491 080.74017 643,940
INSTALL 940 FEET OF 4 INCH POLY AND 120 FEET OF 6 INCH STEEL ALONG SAN
SABA FROM 3RD TO AVE A AND ABANDON 940 FEET OF 4 INCH STEEL N WORTHAM
IN FREESTONE COUNTY. ALL CUSTOMERS WORTHAM SYSTEM INTEGRITY DECEMBER
4492 080.74021 1,214
RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY AND ABANDON 100
FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF WACO STREET PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
4493 080.74022 (97,755)
RELOCATE FACILITIES. INSTALL 370 FEET OF 4 INCH, 340 FEET OF 4 INCH POLY
ALONG GARZA STREET AND ABANDON 320 FEET OF 3 INCH STEEL, 238 FEET OF 3
INCH STEEL IN ACCORDANCE WTIH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TUSCOLA
RELOCATION OF
FACILITIES JULY
4494 080.74027 17,720
INSTALL 1270 FEET OF 2 INCH POLY ALONG HIAWATCH BOULEVARD AND
ABANDON 1212 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
4495 080.74028 216,549
INSTALL 850 FEET OF 2 INCH POLY AND ABANDON 398 FEET OF 1.25 INCH STEEL
AND 130 FEET OF 2 INCH POLY ALONG PAWHUSKA DR IN WICHITA FALLS, WICHITA
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
4496 080.74031 142,633
INSTALL 875 FEET OF 2 INCH POLY AND ABANDON 800 FEET OF 2 INCH STEEL
ALONG HIAWATHA BLVD IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
4497 080.74032 129,242
INSTALL 950 FEET OF 2 INCH POLY AND ABANDON 565 FEET OF 2 INCH STEEL AND
480 FEET OF 2 INCH POLY ALONG INDIAN HEIGHTS BLVD IN WICHITA FALLS,
WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
4498 080.74038 450,801
INSTALL DISTRICT REGULATOR STATION #12, #23, #24 AND ABANDON DISTRICT
REGULATOR STATION #12, #23, #24 ALONG THE STREETS OF THE CITY OF
TERRELL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY DECEMBER
4499 080.74039 140,019
INSTALL 785 FEET OF 2 INCH, 160 FEET OF 6 INCH POLY ALONG ARTHUR AND AVE
K IN WICHITA FALLS AND ABANDON 116 FEET OF 6 INCH, 75 FEET OF 4 INCH POLY,
311 FEET OF 4 INCH, 403 FEET OF 2 INCH AND 386 FEET OF 6 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
MTX Additions
Page 134 of 178
353
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4500 080.74040 146,473
INSTALL 875 FEET OF 2 INCH POLY ALONG GARFIELD AND AVENUE J IN WICHITA
FALLS AND ABANDON 467 FEET OF 2 INCH STEEL AND 1,021 FEET OF 2 INCH POLY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
4501 080.74041 264,989
INSTALL 1,600 FEET OF 2 INCH POLY ALONG KESSLER AVENUE AND HAYES
STREET AND ABANDON 250 FEET OF 2 INCH, 1,035 FEET OF 4 INCH STEEL AND 458
FEET OF 2 INCH AND 430 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
4502 080.74042 6,666
INSTALL 335 FEET OF 2 INCH POLY ALONG THE STREETS OF PECAN RIDGE
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GRAPEVINE GROWTH DECEMBER
4503 080.74047 (16,332)
INSTALL DISTRICT REGULATOR STATION 35, 25 FEET OF 2 INCH POLY AND 25 FEET
OF 4 INCH POLY IN GREENVILLE AND ABANDON DISTRICT REGULATOR STATION 35,
90 FEET OF 4 INCH AND 90 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY OCTOBER
4504 080.74048 655,313
RELOCATE FACILITIES. INSTALL 305 FEET OF 2 INCH, 2,345 FEET OF 4 INCH POLY
AND ABANDON 2,185 FEET OF 4 INCH STEEL, 100 FEET OF 3 INCH POLY AND 305
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JUNE
4505 080.74049 222,342
INSTALL 3,350 FEET OF 2 INCH AND 1,640 FEET OF 4 INCH POLY ALONG THE
STREETS OF LENNON CREEK IN DENTON. RESIDENTIAL HICKORY CREEK GROWTH OCTOBER
4506 080.74050 162,742
INSTALL 180 FEET OF 6 INCH, 4,040 FEET OF 4 INCH AND 780 FEET OF 2 INCH POLY
ALONG THE STREETS OF THE HARVEST SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL ABILENE GROWTH DECEMBER
4507 080.74054 460,416
ABANDON 1,800 FEET OF 6 INCH STEEL TO ACCOMODATE OPTIMAIN PIPE
REPLACEMENT ALONG BYRON AND CORNELL AVENUE IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY DECEMBER
4508 080.74060 24,230
INSTALL 2165 FEET OF 8 INCH STEEL ALONG STREETS OF SAN ANGELO AND
ABANDON 2389 FEET OF FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
4509 080.74063 170,289
INSTALL 4,400 FEET OF 2 INCH AND 2000 FEET OF 4 INCH POLY ALONG BRIAR
HUNT DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH SEPTEMBER
4510 080.74073 2,384
INSTALL 5470 FEET OF 2 INCH ALONG THE STREETS OF STONEY CREEK
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SUNNYVALE GROWTH APRIL
4511 080.74074 144,737
INSTALL 1950 FEET OF 4 INCH AND 2100 OF 2 INCH POLY ALONG THE STREETS OF
BRIDGEWATER SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GARLAND GROWTH JULY
4512 080.74076 770
INSTALL 5160 FEET OF 2 INCH POLY ALONG STREETS OF STONEY CREEK PHASE
4C. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SUNNYVALE GROWTH JUNE
4513 080.74078 4,193
ABANDON 271 FEET OF 3 INCH STEEL AND 222 FEET OF 3 INCH POLY ALONG
NABERS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER
4514 080.74079 6,503
INSTALL 1693 FEET OF 2 INCH POLY AND 2005 FEET OF 4 INCH POLY ALONG EAST
BURLESON STREET AND ABANDON 715 FEET OF 2 INCH STEEL, 505 FEET OF 3
INCH STEEL, 205 FEET OF 4 INCH STEEL, 425 FEET OF 4 INCH POLY, 100 FEET OF 3
INCH POLY AND 650 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY OCTOBER
4515 080.74086 385,668
INSTALL 550 FEET OF 8 INCH AND 200 FEET OF 4 INCH POLY ALONG THE STREETS
OF MIDWAY AND SPRING VALLEY AND ABANDON 550 FEET OF 8 INCH STEEL AND
200 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ADDISON SYSTEM INTEGRITY SEPTEMBER
4516 080.74087 440,168
INSTALL 685 FEET OF 2 INCH, 775 FEET OF 4 INCH POLY ALONG NORTHWEST 15TH
STREET AND ABANDON 898 FEET OF 3 INCH, 539 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH TEXAS RAILROAD COMMISSION OF RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
4517 080.74089 1,097
INSTALL 40 FEET OF 4 INCH STEEL ALONG COUNTY ROAD 195 AND REMOVE 40
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ANSON SYSTEM INTEGRITY OCTOBER
4518 080.74096 159 INSTALL 100 FEET OF 2 INCH POLY ALONG PECAN STREET.
COMMERCIAL OR
INDUSTRIAL BRYAN GROWTH JUNE
4519 080.74098 315,392
RELOCATE FACILITIES. INSTALL 1,250 FEET OF 2 INCH POLY ALONG CHURCH
STREET AND ABANDON 570 FEET OF 2 INCH POLY, 400 FEET OF 2 INCH AND 860
FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
4520 080.74100 (40)
INSTALL 1400 FEET OF 2 INCH POLY ALONG BRYANT BOULEVARD. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL SAN ANGELO GROWTH MARCH
4521 080.74101 890
INSTALL 542 FEET OF 4 INCH POLY ALONG JEFFERSON STREET AND ABANDON 320
FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY OCTOBER
4522 080.74103 6,628
INSTALL 637 FEET OF 2 INCH POLY ALONG THE STREETS OF THE TRINITY FALLS
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH MARCH
4523 080.74108 80
INSTALL 250 FEET OF 2 INCH POLY TO SERVE ONE NEW RESIDENTIAL CUSTERAT
138 IVY LANE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HEWITT GROWTH APRIL
4524 080.74111 204,558
INSTALL 7725 FEET OF 2 INCH AND 1516 FEET OF 4 INCH POLY ALONG THE
STREETS OF THE HONEY CREEK SUBDIVISION. RESIDENTIAL MCKINNEY GROWTH JUNE
4525 080.74114 640,579
INSTALL 4,238 FEET OF 4 INCH POLY ALONG HOLFORD ROAD AND ABANDON 4,149
FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
4526 080.74119 1,098,361
INSTALL 2,157 FEET OF 2 INCH AND 1,721 FEET OF 4 INCH POLY ALONG FORT
AVENUE AND HUBBY AVENUE AND ABANDON 1,090 FEET OF 4 INCH, 317 FEET OF 3
INCH STEEL AND 1,389 FEET OF 4 INCH POLY IN ACCORDANCE WITH TEXAS
RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
4527 080.74121 1,482,488
INSTALL 3,350 FEET OF 2 INCH POLY ALONG PEMBROKE DRIVE IN FORT WORTH
AND ABANDON 420 FEET OF 6 INCH AND 1,550 FEET OF 6 INCH, 3,300 FEET OF 4
INCH AND 79 FEET STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
4528 080.74122 43,005
INSTALL 1028 FEET OF 4 INCH POLY ALONG STREETS OF FORT WORTH AND
ABANDON 855 FEET OF 4 INCH STEEL, 158 FEET OF 3 INCH STEEL, 71 FEET OF 6
INCH STEEL AND 46 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4529 080.74123 17,277
REPLACE 114 STEEL SERVICES WITH POLY SERVICES IN BRYAN IN ACCORDANCE
WITH RAILROAD COMMISION RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
4530 080.74127 172,971
RELOCATE FACILITIES. INSTALL 310 FEET OF 4 INCH POLY ALONG FOREST LN AND
ABANDON 270 FEET OF 4 INCH POLY TO ACCOMODATE PLC/TXDOT. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES JULY
4531 080.74128 109,911
INSTALL 1,775 FEET OF 6 INCH POLY ALONG NORTHERN CROSS BOULEVARD.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL HALTOM CITY GROWTH SEPTEMBER
4532 080.74130 1,790
INSTALL 330 FEET OF 2 INCH POLY AND ABANDON 330 FEET OF 2 INCH STEEL
ALONG SOUTH OAK IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ARCHER CITY SYSTEM INTEGRITY OCTOBER
4533 080.74136 3,376
RELOCATE FACILITIES. INSTALL 160 FEET OF 4 INCH POLY AND ABANDON 140
FEET OF 4 INCH STEEL ALONG LIVINGSTON DRIVE TO ACCOMMODATE CITY OF
HURST STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS HURST
RELOCATION OF
FACILITIES OCTOBER
4534 080.74137 818,169
INSTALL 700 FEET OF 6 INCH, 1,200 FEET OF 4 INCH AND 650 FEET OF 2 INCH POLY
ALONG JOHNS WAY IN FORT WORTH AND ABANDON 700 FEET OF 6 INCH, 1,200
FEET OF 4 INCH AND 400 FEET OF 2 INCH STEEL AND 250 FEET OF 1.25 INCH POLY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4535 080.74140 134,349
RELOCATE FACILITIES. INSTALL 880 FEET OF 2 INCH POLY AND ABANDON 880
FEET OF 2 INCH STEEL ALONG CROWN ROAD TO ACCOMODATE CITY OF FORT
WORTH PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4536 080.74144 443,826
INSTALL 1,260 FEET OF 8 INCH, 2,785 FEET OF 6 INCH, 1,190 FEET OF 4 INCH, AND
5,020 FEET OF 2 INCH POLY ALONG THE STREETS OF BAR C RANCH SUBDIVISION.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4537 080.74147 65,417
INSTALL 1100 FEET OF 6 INCH, 900 FEET OF 4 INCH AND 6175 FEET OF 2 INCH POLY
ALONG THE STREETS OF EDGEWATER PHASE 1. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL FATE GROWTH DECEMBER
MTX Additions
Page 135 of 178
354
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4538 080.74149 159,954
INSTALL 5100 FEET OF 2 INCH AND 330 FEET OF 4 INCH POLY ALONG THE STREETS
OF WOODCREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FATE GROWTH DECEMBER
4539 080.74150 105,500
INSTALL 3,050 FEET OF 2 INCH POLY ALONG THE STREETS OF WOODCREEK
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FATE GROWTH JUNE
4540 080.74155 (36) INSTALL 100 FEET OF 2 INCH POLY ALONG TIPPERARY DRIVE. RESIDENTIAL GRAPEVINE GROWTH MARCH
4541 080.74158 12,507
INSTALL 136 FEET OF 4 INCH POLY ALONG THE STREET OF SUMMER CREEK
BOULEVARD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH SEPTEMBER
4542 080.74159 1,192,529
INSTALL 1,000 FEET OF 8 INCH POLY ALONG FISHER STREET, 3,255 FEET OF 4
INCH POLY AND 200 FEET OF 2 INCH POLY ALONG LIND AND SPENCE STREETS
AND ABANDON 190 FEET OF 1.25 INCH, 25 FEET OF 2 INCH POLY AND 735 FEET OF
2 INCH, 685 FEET OF 4 INCH STEEL, 1,050 FEET OF 4 INCH POLY, AND 650 FEET OF
6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY DECEMBER
4543 080.74160 82,714
INSTALL 700 FEET OF 4 INCH POLY ALONG HIGHWAY 6 IN BRYAN. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL BRYAN GROWTH DECEMBER
4544 080.74161 638 INSTALL 100 FEET OF 4 INCH POLY ALONG THE STREETS OF ABILENE.
COMMERCIAL OR
INDUSTRIAL ABILENE GROWTH APRIL
4545 080.74162 2,838
INSTALL 2,296 FEET OF 4 INCH AND 2,734 FEET OF 2 INCH POLY ALONG THE
STREETS OF BOOT RANCH PHASE 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FREDERICKSBURG GROWTH JUNE
4546 080.74163 535
INSTALL 400 FEET OF 2 INCH POLY ALONG SOUTH JUPITER DRIVE. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL GARLAND GROWTH JUNE
4547 080.74164 1,431
INSTALL 120 FEET OF 6 INCH POLY AND ABANDON 40 FEET OF 6 INCH POLY ALONG
OLIVER DUE TO CITY OF GREENVILLE STORM SEWER IMPROVEMENTS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY OCTOBER
4548 080.74165 4,016
INSTALL 1200 FEET OF 4 INCH POLY ALONG MIDTOWN PARK. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL BRYAN GROWTH SEPTEMBER
4549 080.74169 96,409
INSTALL 1,400 FEET OF 6 INCH POLY ALONG THE STREETS OF LAKE RIDGE
COMMONS SUBDIVISION IN MANSFIELD. ALL CUSTOMERS MANSFIELD GROWTH DECEMBER
4550 080.74170 1,837 INSTALL 1480 FEET OF 2 INCH POLY ALONG COUNTY ROAD 245. ALL CUSTOMERS GEORGETOWN GROWTH JUNE
4551 080.74171 154,975
INSTALL 150 FEET OF 4 INCH AND 3,800 FEET OF 2 INCH POLY ALONG THE
STREETS OF LAKE RIDGE COMMONS SUBDIVISION IN MANSFIELD. RESIDENTIAL MANSFIELD GROWTH DECEMBER
4552 080.74173 18,707
INSTALL 998 FEET OF 4 INCH ALONG THE STREETS OF NORTHLINE SUBDIVISION.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JUNE
4553 080.74174 381,597
INSTALL 3,575 FEET OF 2 INCH POLY ALONG FIESTA CIRCLE AND ABANDON 3,550
FEET OF 2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JULY
4554 080.74176 13,278
INSTALL 1,571 FEET OF 4 INCH AND 3,362 FEET OF 2 INCH POLY ALONG THE
STREETS OF BRYSON SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER
4555 080.74184 299,454
RELOCATE FACILITIES.
INSTALL 2,300 FEET OF 2 INCH POLY ALONG S. DENTON STREET AND ABANDON
2,300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209 ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER
4556 080.74186 7,461
INSTALL 2,180 FEET OF 2 INCH AND 525 FEET OF 4 INCH POLY ALONG THE
STREETS OF TWIN OAKS SUBDIVISION IN FAIRVIEW. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL FAIRVIEW GROWTH OCTOBER
4557 080.74188 1,348,550
INSTALL 1,936 FEET OF 2 INCH, 842 FEET OF 4 INCH AND 2,008 FEET OF 8 INCH
POLY ALONG JACKSON, 10TH, CLAY AND AUSTIN STREET IN KAUFMAN AND
ABANDON 465 FEET OF 4 INCH AND 417 FEET OF 2 INCH POLY AND 2,148 FEET OF
3 INCH, 1,126 FEET OF 2INCH STEEL ALL CUSTOMERS KAUFMAN SYSTEM INTEGRITY DECEMBER
4558 080.74200 347,928
INSTALL 4,067 FEET OF 2 INCH, 1,348 FEET OF 4 INCH AND 3,024 FEET OF 6 INCH
POLY ALONG THE STREETS OF TRINITY FALLS SUBDIVISION. RESIDENTIAL MCKINNEY GROWTH OCTOBER
4559 080.74202 107,389
INSTALL 1000 FEET OF 2 INCH POLY ALONG THE STEETS OF IRONSIDE
SUBDIVSION. RESIDENTIAL DALLAS GROWTH MARCH
4560 080.74204 4,207
INSTALL 172 FEET OF 2 INCH POLY ALONG PECAN GROVE ROAD. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL SHERMAN GROWTH MARCH
4561 080.74208 5,098
INSTALL 1690 FEET OF 2 INCH POLY ALONG NORTH MAIN STREET AND ABANDON
290 FEET OF 2 INCH AND 70 FEET OF 4 INCH POLY AND 1166 FEET OF 3 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY OCTOBER
4562 080.74210 907
INSTALL 1955 FEET OF 4 INCH POLY ALONG VILLAGES OF 121. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL PLANO GROWTH JUNE
4563 080.74215 49,706
INSTALL 1,845 FEET OF 4 INCH POLY ALONG LYNN LANE AND PLEASANT LANE IN
COPPERAS COVE. DEVELOPER INSTALLED FACILITIES, ALL CUSTOMERS COPPERAS COVE GROWTH SEPTEMBER
4564 080.74216 220,306
INSTALL 1760 FEET OF 4 INCH POLY AND 4220 FEET OF 2 INCH POLY ALONG THE
STREETS OF TRAILS OF ELIZABETH CREEK SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER
4565 080.74217 782
RELOCATE FACILITIES. INSTALL 40 FEET OF 4 INCH POLY ALONG AEROBIC LANE
AND ABANDON 20 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF GREENVILLE
STORM SEWER IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE
RELOCATION OF
FACILITIES OCTOBER
4566 080.74218 7,999
INSTALL 775 FEET OF 4 INCH POLY AND ABANDON 575 FEET OF 3 INCH STEEL AND
290 FEET OF POLY ALONG 4TH STREET IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY OCTOBER
4567 080.74219 2,363
INSTALL 150 FEET OF 2 INCH POLY ALONG THE STREETS OF NEW COMMERICAL
DEVELOPMET IN TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH APRIL
4568 080.74225 4,902
INSTALL 560 FEET OF 6 INCH AND 680 FEET OF 4 INCH POLY ALONG OLYMPUS
BOULEVARD AND WATERMILL ROAD. ALL CUSTOMERS DALLAS GROWTH JULY
4569 080.74229 137,503
INSTALL 2,104 FEET OF 4 INCH POLY ALONG THE STREETS OF ROSEMARY RIDGE
SUBDIVISION IN CROWLEY. RESIDENTIAL CROWLEY GROWTH OCTOBER
4570 080.74233 22,843
INSTALL 1,470 FEET OF 2 INCH AND 770 FEET OF 8 INCH POLY ALONG THE
STREETS OF OAKMONT SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH SEPTEMBER
4571 080.74241 287,112
INSTALL 800 FEET OF 8 INCH AND 5600 FEET OF 4 INCH POLY ALONG THE STREETS
OF HARVEST SUBDIVISION. RESIDENTIAL NORTHLAKE GROWTH JUNE
4572 080.74242 344,997
INSTALL 1,000 FEET OF 8 INCH, 2,010 FEET OF 6 INCH AND 5,200 FEET OF 4 INCH
POLY ALONG THE STREETS OF HARVEST SUBDIVISION. RESIDENTIAL NORTHLAKE GROWTH DECEMBER
4573 080.74249 214,081
INSTALL 1285 FEET OF 4 INCH POLY AND 3445 FEET OF 2 INCH POLY ALONG THE
STREETS OF LIBERTY TRAILS PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4574 080.74250 629,602 INSTALL 3,800 FEET OF 8 INCH POLY ALONG CEMETERY ROAD IN WISE COUNTY. ALL CUSTOMERS BOYD GROWTH DECEMBER
4575 080.74254 239,465
INSTALL 3,195 FEET OF 4 INCH AND 4,340 FEET OF 2 INCH POLY ALONG THE
STREETS OF AZLE GROVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL AZLE GROWTH DECEMBER
4576 080.74257 527,920
INSTALL 1,250 FEET OF 2 INCH AND 2,000 FEET OF 4 INCH POLY ALONG DENTON
DRIVE AND HAVENHURST STREET IN FARMERS BRANCH AND ABANDON 1,250
FEET OF 2 INCH AND 2,000 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY DECEMBER
4577 080.74258 47,454
INSTALL 1,500 FEET OF 4 INCH POLY ALONG THE STREETS OF UCD SAGINAW
SUBDIVISION. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL SAGINAW GROWTH DECEMBER
4578 080.74259 130,601
INSTALL 1500 FEET OF 6 INCH POLY AND ABANDON 1200 FEET OF 3 INCH STEEL
ALONG WYCON DRIVE ALL CUSTOMERS WACO
SYSTEM
IMPROVEMENT JULY
4579 080.74260 650,169
RELOCATE FACILITIES. INSTALL 3,000 OF 4 INCH AND 1,500 OF 2 INCH POLY ALONG
THE STREETS OF FERRIS, TEXAS AND ABANDON 6,500 FEET OF 2 INCH, 3 INCH
STEEL AND ABANDON DISTRICT REGULATOR STATION 03 IN ACCAORDAINCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FERRIS SYSTEM INTEGRITY JUNE
4580 080.74261 637
INSTALL SINGLE PHASE POWER SUPPLY AND REMOVE SOLAR PANELS AND
BATTERIES FOR STATION CONTROLLER IN COLLIN COUNTY. ALL CUSTOMERS PLANO SYSTEM INTEGRITY JULY
4581 080.74264 191,525 INSTALL 2,200 FEET OF 2 INCH POLY ALONG WEST MAYFIELD ROAD IN ARLINGTON. RESIDENTIAL ARLINGTON GROWTH DECEMBER
4582 080.74266 359,524
RELOCATE FACILITIES. INSTALL 1,696 FEET OF 2 INCH, 815 FEET OF 4 INCH POLY
ALONG SHACKLEFORD STREET AND ABANDON 1,687 FEET OF 2 INCH, 739 FEET OF
4 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 136 of 178
355
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4583 080.74272 2,075
INSTALL 330 FEET OF 2 INCH POLY ALONG BRIDGECREEK DRIVE. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL WICHITA FALLS GROWTH JUNE
4584 080.74273 84,798
INSTALL 1,045 FEET OF 4 INCH AND 210 FEET OF 2 INCH POLY ALONG PRIVATE
DRIVE G. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL COLLEGE STATION GROWTH DECEMBER
4585 080.74278 3,373,268
INSTALL 13,300 FEET OF 12 INCH AND 500 FEET OF 6 INCH POLY ALONG THE
STREETS OF BRIDGEWATER SUBDIVISION IN MIDLOTHIA, ELLIS COUNTY. ALL CUSTOMERS MIDLOTHIAN GROWTH DECEMBER
4586 080.74281 2,854
RELOCATE FACILITIES. INSTALL 280 FEET OF 6 INCH POLY AND ABANDON 280
FEET OF 6 INCH STEEL ALONG MIDWESTERN PARKWAY TO ACCOMMODATE CITY
OF WICHITA FALLS STREET PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
RELOCATION OF
FACILITIES OCTOBER
4587 080.74283 189,080
INSTALL TEMETRY TO LARGE COMMERCIAL CUSTOMER FOR MONITORING
CUSTOMER USE FOR POTENTIAL CURTAILMENT IN EXTREME WEATHER EVENTS IN
DALLAS. ALL CUSTOMERS DALLAS
SYSTEM
IMPROVEMENT DECEMBER
4588 080.74285 91,789
INSTALL 1,957 FEET OF 8 INCH POLY ALONG LOUISIANA STREET. DEVELOPER
INSTALLED FACILITIES. ALL CUSTOMERS CELINA GROWTH SEPTEMBER
4589 080.74287 91,560
RELOCATE FACILITIES. INSTALL 600 FEET OF 6 INCH POLY AND ABANDON 600
FEET OF 6 INCH STEEL ALONG LAS VEGAS TRAIL TO ACCOMMODATE CITY OF
FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4590 080.74288 53,831 INSTALL 6,850 FEET OF 6 INCH POLY ALONG THE STREETS OF CR 447 AND CR 728. ALL CUSTOMERS PRINCETON GROWTH DECEMBER
4591 080.74290 17,491
INSTALL 150 FEET OF 6 INCH, 935 FEET OF 4 INCH AND 977 FEET OF 2 INCH POLY
ALONG THE STREETS OF CHESTER RANCH SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
4592 080.74295 1,000,328
RELOCATE FACILITIES. INSTALL 2,990 FEET OF 4 INCH AND 690 FEET OF 2 INCH
POLY ALONG SHILOH ROAD AND ABANDON 2,850 FEET OF 8 INCH, 80 FEET OF 6
INCH, 80 FEET OF 4 INCH, 560 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4593 080.74299 1,289,973
INSTALL 3,500 FEET OF 4 INCH, 1,500 FEET OF 2 INCH POLY ALONG ALMOND DRIVE
AND ABANDON 1,500 FEET OF 1.25 INCH, 3,300 FEET OF 2 INCH, 150 FEET OF 3
INCH AND 600 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISISON OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY DECEMBER
4594 080.74305 393,520
INSTALL 3,400 FEET OF 2 INCH POLY AND 100 FEET OF 4 INCH STEEL CASING
ALONG W. FANNIN STREET AND ABANDON DISTRICT REGULATOR STATION #18,
2,855 FEET OF 4 INCH, 379 FEET OF 3 INCH AND 40 FEET OF 2 INCH STEEL, AND 594
FEET OF 4 INCH, 437 FEET OF 3 INCH POLY IN ACCORDANCE WITH TEXAS
RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY DECEMBER
4595 080.74308 3,834
INSTALL DISTRICT REGULATOR STATION, 80 FEET OF 2 INCH POLY AND 250 FEET
OF 4 INCH POLY ALONG ELM STREET AND ABANDON 26 FEET OF 4 INCH STEEL,
146 FEET OF 2 INCH STEEL, 191 FEET OF 4 INCH STEEL AND 105 FEET OF 4 INCH
POLY AND DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALVORD SYSTEM INTEGRITY OCTOBER
4596 080.74309 7,303
INSTALL DISTRICT REGULATOR STATION AND 140 FEET OF 4 INCH POLY ALONG
STREETS OF CHILLICOTHE AND ABANDON DISTRICT REGULATOR STATION 02, 35
FEET OF 4 INCH POLY, 20 FEET OF 2 INCH POLY, 19 FEET OF 2 INCH STEEL AND 19
FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CHILLICOTHE SYSTEM INTEGRITY OCTOBER
4597 080.74310 688
INSTALL DISTRICT REGULATOR STATION 04 , 575 FEET OF 2 INCH POLY AND 75
FEET OF 4 INCH POLY ALONG WEST CARPENTER STREET AND ABANDON 152 FEET
OF 2 INCH STEEL, 43 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION
04 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY OCTOBER
4598 080.74311 8,632
INSTALL DISTRICT REGULATOR STATION 01, 30 FEET OF 2 INCH POLY AND 30 FEET
OF 4 INCH POLY ALONG STREETS OF KIRKLAND AND ABANDON DISTRICT
REGULATOR STATION 01, 121 FEET OF 2 INCH STEEL, 76 FEET OF 4 INCH STEEL
AND 63 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS KIRKLAND SYSTEM INTEGRITY OCTOBER
4599 080.74312 2,869
INSTALL DISTRICT REGULATOR STATION 01 ALONG CHAMBERS STREET AND
ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NEWARK SYSTEM INTEGRITY OCTOBER
4600 080.74313 900,224
RELOCATE FACILITIES.
INSTALL 3,110 FEET OF 4 INCH POLY ALONG HIGHWOOD DRIVE AND ABANDON
3,105 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4601 080.74315 7,461
INSTALL DISTRICT REGULATOR STATION 08 ALONG FANNIN STREET AND ABANDON
DISTRICT REGULATOR STATION 08 IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA SYSTEM INTEGRITY OCTOBER
4602 080.74318 15,416
INSTALL DISTRICT REGULATOR STATION DRS01, 30 FEET OF 3 INCH, 12 FEET OF 2
INCH STEEP AND 30 FEET OF 2 INCH POLY ALONG THE STREETS OF ODELL,
WILBARGER COUNTY. ALL CUSTOMERS ODELL SYSTEM INTEGRITY DECEMBER
4603 080.74320 95,969
INSTALL DISTRICT REGULATOR STATION 04, 80 FEET OF 4 INCH POLY AND
ABANDON DISTRICT REGULATOR STATION 04, 210 FEET OF 4 INCH POLY, 59 FEET
OF 4 INCH STEEL, AND 37 FEET OF 4 INCH STEEL ALONG E 4TH STREET IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY JUNE
4604 080.74321 551,675
INSTALL 3,150 FEET OF 4 INCH AND 30 FEET OF 2 INCH POLY ALONG MOTLEY
DRIVE ALLEY AND ABANDON 2,490 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4605 080.74326 177,093
INSTALL 3890 FEET OF 2 INCH AND 1125 FEET OF 4 INCH POLY ALONG THE
STREETS OF THE WOLF CREEK FARMS SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL MELISSA GROWTH APRIL
4606 080.74328 1,540
RELOCATE FACILITIES. INSTALL 700 FEET OF 4 INCH POLY ALONG WILLIAMSON
DRIVE AND ABANDON 700 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
RELOCATION OF
FACILITIES OCTOBER
4607 080.74335 406,836
INSTALL 2,437 FEET OF 4 INCH POLY AND ABANDON 2,421 FEET OF 2 INCH STEEL
ALONG PECOS STREET IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
4608 080.74339 66 INSTALL 150 FEET OF 2 INCH POLY ALONG BUFFALO GAP ROAD.
COMMERCIAL OR
INDUSTRIAL ABILENE GROWTH MARCH
4609 080.74340 15,585
INSTALL 775 FEET OF 2 INCH POLY ALONG SAN CARLOS AND ABANDON 590 FEET
OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER
4610 080.74341 346,175
INSTALL 1,800 FEET OF 2 INCH POLY ALONG AVENUE H AND ABANDON 2,170 FEET
OF 4 INCH AND 80 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8,209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE
4611 080.74343 575,905
INSTALL 1,467 FEET OF 6 INCH, 1,773 FEET OF 4 INCH POLY AND ABANDON 1,467
FEET OF 6 INCH, 10 FEET OF 4 INCH, 1,763 FEET OF 3 INCH STEEL ALONG PARK
ROW AVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER
4612 080.74344 652,709
INSTALL 2,736 OF 4 INCH AND 635 FEET OF 2 INCH POLY AND ABANDON 2,696
FEET OF 3 INCH, 595 OF 2 INCH STEEL ALONG PARK ROW DRIVE IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
4613 080.74345 670,782
RELOCATE FACILITIES. INSTALL 1,486 FEET OF 4 INCH AND 1,733 FEET OF 2 INCH
POLY AND ABANDON 875 FEET OF 4 INCH AND 1,117 FEET OF 2 INCH STEEL AND
611 FEET OF 4 INCH AND 616 FEET OF 2 INCH POLY ALONG THE STREETS OF
MOORE, KELLY AND HARMON IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
4614 080.74346 578,460
RELOCATE FACILITIES. INSTALL 1,657 FEET OF 4 INCH AND 1,178 FEET OF 2 INCH
POLY AND ABANDON 887 FEET OF 4 INCH, 770 FEET OF 3 INCH, 1,178 FEET OF 2
INCH STEEL ALONG THE STREETS OF MEADOW, FORRESTAL AND KELLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
4615 080.74347 598,730
RELOCATE FACILITIES. INSTALL 3,821 FEET OF 2 INCH POLY AND ABANDON 3,560
FEET OF 2 INCH STEEL ALONG THE STREETS OF KELLY, FORRESTAL AND
HARMONY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
MTX Additions
Page 137 of 178
356
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4616 080.74348 467,978
RELOCATE FACILIITES. INSTALL 2,160 FEET OF 4 INCH POLY AND ABANDON 2,160
FEET OF 3 INCH STEEL ALONG CARSWELL TERRACE IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
4617 080.74349 761,884
INSTALL 2,309 FEET OF 4 INCH, 1,151 FEET OF 2 INCH POLY ALONG WYNN
TERRACE AND BIGGS TERRACE IN ARLINGTON AND ABANDON 2,309 FEET OF 4
INCH, 1,126 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
4618 080.74353 1,000,729
INSTALL 2,307 FEET OF 2 INCH AND 1,581 FEET OF 4 INCH POLY AND ABANDON
3,765 FEET OF 4 INCH STEEL ALONG FORT AVE, HARLAN AVE, AND SANGER AVE IN
WACO, MCCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
4619 080.74356 1,064,160
INSTALL 1,615 FEET OF 2 INCH AND 2,300 FEET OF 4 INCH POLY AND ABANDON
3,534 FEET OF 4 INCH, 317 FEET OF 3 INCH STEEL AND 329 FEET OF 4 INCH AND
259 FEET OF 6 INCH POLY ALONG THE STREETS OF WACO AND MORROW DRIVE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
4620 080.74362 9,738
INSTALL 1628 FEET OF 2 INCH POLY MAIN AND 768 FEET OF 4 INCH POLY MAIN
ALONG EAST COWAN STREET AND ABANDON 318 FEET OF 2 INCH POLY, 4 FEET OF
2 INCH STEEL, 1181 FEET OF 3 INCH STEEL, 167 FEET OF 4 INCH POLY AND 708
FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY OCTOBER
4621 080.74363 62,913
INSTALL (1) 4 INCH SERVICE LINE AND (1) METER ALONG BROADWAY AND
INTERSTATE 30 IN GARLAND.
COMMERCIAL OR
INDUSTRIAL GARLAND GROWTH JUNE
4622 080.74372 210,486
INSTALL 2,264 FEET OF 4 INCH AND 1540 FEET OF 2 INCH POLY ALONG THE
STREETS OF WHITESTONE CREST SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL BENBROOK GROWTH JULY
4623 080.74373 152
RELOCATE FACILITIES. INSTALL 450 FEET OF 4 INCH POLY AND ABANDON 450
FEET OF 4 INCH POLY ALONG GENERAL PARKWAY TO ACCOMMODATE MAIN OUT
OF EASEMENT. ALL CUSTOMERS COLLEGE STATION
RELOCATION OF
FACILITIES MARCH
4624 080.74379 16,141
INSTALL 656 FEET OF 2 INCH AND 2765 FEET OF 4 INCH POLY AND ABANDON 160
FEET OF 2 INCH, 720 FEET OF 3 INCH, AND 145 FEET OF 4 INCH STEEL ALONG EAST
NCKEBBAB AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY OCTOBER
4625 080.74382 (451,041)
INSTALL 918 FEET OF 6 INCH POLY ALONG INTERNATIONAL PARKWAY IN DFW
AIRPORT/GRAPEVINE TO ACCOMMODATE CONSTRUCTION OF NEW COMMERCIAL
CUSTOMERS IN TERMINAL C AND PROPOSED BOILER PLANT.
COMMERCIAL OR
INDUSTRIAL GRAPEVINE GROWTH DECEMBER
4626 080.74386 404,073
INSTALL DISTRICT REGULATOR STATION AND 190 FEET OF 6 INCH, 1150 FEET OF 2
INCH, 40 FEET OF 4 INCH POLY ALONG COLLEGE STREET AND ABANDON DISTRICT
REGULATOR STATION AND 3,135 FEET OF 6 INCH, 500 FEET OF 4 INCH, 610 FEET
OF 3 INCH STEEL, 225 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY DECEMBER
4627 080.74388 9,502
INSTALL 2,476 FEET OF 6 INCH, 1560 FEET OF 4 INCH AND 2,458 FEET OF 2 INCH
POLY ALONG THE STREETS OF DEVINE LAKE SUBDIVISION. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JULY
4628 080.74390 9,435
INSTALL 3,899 FEET OF 2 INCH POLY ALONG THE STREETS OF MORNINGSTAR
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER
4629 080.74394 1,413
INSTALL 500 FEET OF 6 INCH POLY ALONG FARMERS MARKET 548. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORNEY GROWTH SEPTEMBER
4630 080.74397 1,328
RELOCATE FACILITIES. INSTALL 60 FEET OF 4 INCH POLY AND ABANDON 40 FEET
OF 4 INCH STEEL ALONG CASCADE DRIVE TO ACCOMMODATE CITY OF IRVING
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
4631 080.74398 6,323
INSTALL 685 FEET OF 2 INCH POLY ALONG FM 1325 IN ROUND ROCK, WILLIAMSON
COUNTY. DEVELOPER INSTALLED FACILITY.
COMMERCIAL OR
INDUSTRIAL ROUND ROCK GROWTH DECEMBER
4632 080.74402 394,042
INSTALL 1,112 FEET OF 4 INCH POLY AND ABANDON 195 FEET OF 2 INCH POLY AND
716 FEET OF 2 INCH, 103 FEET OF 3 INCH STEEL ALONG AUSTIN AND TRAVIS
STREET IN ACCORDANCE TO THE TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS ROANOKE SYSTEM INTEGRITY SEPTEMBER
4633 080.74404 281,884
INSTALL 1,730 FEET OF 2 INCH POLY ALONG VINETTA DRIVE AND ABANDON 1,737
FEET OF 2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JULY
4634 080.74408 155,417
INSTALL 1825 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG CHICAGO
STREET AND ABANDON 110 FEET OF 2 INCH POLY AND 2465 FEET OF 2 INCH STEEL
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4635 080.74409 95,563
INSTALL 2635 FEET OF 2 INCH POLY ALONG PUEBLO STREET AND ABANDON 635
FEET OF 2 INCH POLY AND 665 FEET OF 1.25 INCH AND 1450 FEET OF 2 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4636 080.74410 876,083
INSTALL 2,165 FEET OF 2 INCH AND 1,020 FEET OF 4 INCH POLY AND ABANDON
1,075 FEET OF 6 INCH AND 2,085 FEET OF 3 INCH STEEL. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4637 080.74412 107
INSTALL 300 FEET OF 2 INCH POLY ALONG SECOND STREET. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL ROYSE CITY GROWTH MARCH
4638 080.74415 1,021,013
INSTALL 2,325 FEET OF 2 INCH AND 2,675 FEET OF 4 INCH POLY AND ABANDON
520 FEET OF 6 INCH, 1,485 FEET OF 4 INCH, AND 2,995 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JUNE
4639 080.74416 667,565
INSTALL 2, 325 FEET OF 2 INCH, 660 FEET OF 4 INCH POLY AND ABANDON 340 FEET
OF 6 INCH, 2,990 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JUNE
4640 080.74417 715,967
INSTALL 2,325 FEET OF 2 INCH AND 895 FEET OF 4 INCH POLY AND ABANDON 675
FEET OF 6 INCH, 2,355 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4641 080.74418 852,514
INSTALL 3,565 FEET OF 4 INCH POLY AND ABANDON 3,565 FEET OF 6 INCH STEEL
IN THE ALLEY SOUTH OF GROSS FROM FREEPORT TO LA PRADA IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4642 080.74419 824,546
INSTALL 3,565 FEET OF 2 INCH AND 325 FEET OF 4 INCH POLY AND ABANDON 325
FEET OF 6 INCH AND 3,460 FEET OF 3 INCH STEEL. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4643 080.74421 870,829
INSTALL 3,795 FEET OF 2 INCH AND 635 FEET OF 4 INCH POLY AND ABANDON 660
FEET OF 6 INCH, 3,600 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JULY
4644 080.74422 921,807
INSTALL 1,615 FEET OF 2 INCH AND 1,745 FEET OF 4 INCH POLY AND ABANDON
1,815 FEET OF 4 INCH, 1,020 FEET OF 3 INCH, 650 FEET OF 2 INCH STEEL AND 10
FEET OF 2 INCH POLY. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4645 080.74424 780,720
INSTALL 3,180 FEET OF 4 INCH AND 250 FEET OF 2 INCH POLY ALONG OATES
DRIVE AND ABANDON 2,470 FEET OF 8 INCH, 200 FEET OF 4 INCH, 400 FEET OF 3
INCH STEEL IN ACCORDDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209 ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4646 080.74425 677,806
INSTALL 2,420 FEET OF 2 INCH POLY ALONG HIGHWOOD DRIVE AND ABANDON
2,420 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4647 080.74426 9,125
INSTALL 2060 FEET OF 2 INCH POLY ALONG CASA OAKS DRIVE AND ABANDON 1070
FEET OF 6 INCH AND 1070 FEET OF 3 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4648 080.74430 221,097
INSTALL 1,483 FEET OF 4 INCH POLY ALONG MOBERLY STREET AND ABANDON
1,397 FEET ON 2 INCH STEEL AND 72 FEET OF 2 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
4649 080.74433 1,331,714
INSTALL 100 FEET OF 4 INCH, 15 FEET OF 6 INCH AND 2,900 FEET OF 8 INCH POLY
AND ABANDON 2,170 FEET OF 8 INCH, 150 FEET OF 6 INCH, 120 FEET OF 3 INCH,
130 FEET OF 2 INCH STEEL AND 50 FEET OF 3 INCH POLY ALONG SOUTH POLK IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY NOVEMBER
4650 080.74434 0
INSTALL 1 REGULATOR STATION AND ABANDON 1 REGULATOR STATION IN
PARADISE COUNTY. ALL CUSTOMERS PARADISE SYSTEM INTEGRITY JANUARY
MTX Additions
Page 138 of 178
357
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4651 080.74435 30,243
RELOCATE FACILITIES. INSTALL 780 FEET OF 2 INCH POLY AND ABANDON 760
FEET OF 2 INCH STEEL ALONG JEFFERSON STREET TO ACCOMMODATE CITY OF
COCKRELL HILL STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS COCKRELL HILL
RELOCATION OF
FACILITIES OCTOBER
4652 080.74438 966 INSTALL 213 FEET OF 2 INCH POLY ALONG 13TH STREET. ALL CUSTOMERS GEORGETOWN
SYSTEM
IMPROVEMENT JULY
4653 080.74439 557,704
INSTALL 2,334 FEET OF 2 INCH POLY ALONG TIMBERVIEW AND ABANDON 2,310
FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JULY
4654 080.74440 611,389
INSTALL 2,455 FEET OF 4 INCH POLY ALONG RUTZ AND ABANDON 1,950 FEET OF 2
INCH , 355 FEET OF 1.25 INCH POLY AND 60 FEET OF 1.25 STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4655 080.74441 503,901
INSTALL 1,660 FEET OF 2 INCH POLY ALONG CHIHUAHUA AND ABANDON 1,890
FEET OF 2 INCH STEEL AND 395 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4656 080.74442 841,156
INSTALL 3,090 FEET ON 2 INCH, 515 FEET OF 4 INCH POLY ALONG KRAT STREET
AND ABANDON 3,820 FEET OF 2 INCH, STEEL AND 190 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JULY
4657 080.74443 459,935
INSTALL 2,925 FEET OF 2 INCH POLY ALONG MERRELL STREET AND ABANDON
2,335 FEET OF 4 INCH, 65 FEET OF 3 INCH, 645 FEET OF 2 INCH STEEL AND 25 FEET
OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JULY
4658 080.74447 8,329 INSTALL 215 FEET OF 4 INCH POLY ALONG GOWDY STREET.
COMMERCIAL OR
INDUSTRIAL WHITEWRIGHT GROWTH JUNE
4659 080.74450 2,463
RELOCATE FACILITIES. INSTALL 275 FEET OF 4 INCH AND 85 FEET OF 2 INCH POLY
ALONG KENLEY STREET AND ABANDON 275 FEET OF 4 INCH AND 130 FEET OF 2
INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4660 080.74452 (33) INSTALL 135 FEET OF 2 INCH POLY ALONG STREETS OF PANDA EXPRESS.
COMMERCIAL OR
INDUSTRIAL ATHENS GROWTH JANUARY
4661 080.74454 636,520
INSTALL 2,664 FEET OF 4 INCH POLY AND ABANDON 2,664 FEET OF 3 INCH STEEL
ALONG CONNALLY TERRACE SUBDIVISION IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER
4662 080.74457 2,722
RELOCATE FACILITIES. INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 299
FEET OF 4 INCH POLY AND 84 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY
PAVING PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS VERNON
RELOCATION OF
FACILITIES OCTOBER
4663 080.74458 301,069
INSTALL 2,125 FEET OF 2 INCH POLY AND ABANDON 2,020 FEET OF 2 INCH STEEL
AND 100 FEET OF 2 INCH POLY ALONG THE STREETS OF BIGGS TERRACE AND
BIGGS CIRCLE IN ACCORDANE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
4664 080.74459 1,440
INSTALL DISTRICT REGULATOR STATION 18 ALONG BAIRD STREET AND ABANDON
DISTRICT REGULATOR STATION 18 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER
4665 080.74461 151,474
INSTALL 4,811 FEET OF 2 INCH POLY ALONG THE STREETS OF TRINITY FALLS PU7-
2. RESIDENTIAL MCKINNEY GROWTH JULY
4666 080.74466 1,845,593
INSTALL 2,519 FEET OF 8 INCH POLY ALONG FISHER STREET AND 1,300 FEET OF 4
INCH POLY ALONG HODGE STREET AND ABANDON 135 FEET OF 4 INCH, 140 FEET
OF 2 INCH, 115 FEET OF 3 INCH, 330 FEET OF 6 INCH POLY AND 490 FEET OF 2
INCH, 445 FEET OF 3 INCH, AND 1,625 FEET OF 6 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY DECEMBER
4667 080.74471 1,604,995
INSTALL 2,600 FEET OF 8 INCH, 505 FEET OF 2 INCH, AND 100 FEET OF 4 INCH POLY
AND ABANDON 2,620 FEET OF 8 INCH, 485 FEET OF 4 INCH AND 565 FEET OF 3
INCH STEEL ALONG POLK FROM CAMP WISDOM SOUTH IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4668 080.74475 372,310
INSTALL 2,795 FEET OF 2 INCH POLY ALONG SOUTH BAUGH STREET AND
ABANDON 2,745 FEET OF 2 INCH STEEL AND 720 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS ALVARADO SYSTEM INTEGRITY JULY
4669 080.74477 73,715
RELOCATE FACILITIES. INSTALL 160 FEET OF 2 INCH POLY AND ABANDON ONE 1.25
INCH POLY ALONG OLDHAM LANE. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
4670 080.74484 5,531
INSTALL 335 FEET OF 4 INCH POLY ALONG MIDPOINT DRIVE. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL LANCASTER GROWTH JUNE
4671 080.74485 524
INSTALL 2,805 FEET OF 2 INCH POLY ALONG THE STREETS OF VILLAGES OF
CHARLESTON SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GLENN HEIGHTS GROWTH JUNE
4672 080.74486 160
INSTALL 400 FEET OF 2 INCH POLY ALONG 5TH STREET. DEVELOPER INSTALLED
FACILITIES. ALL CUSTOMERS MANSFIELD GROWTH MARCH
4673 080.74488 7,327
INSTALL 6,778 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER
4674 080.74490 342,829
INSTALL 1,200 FEET OF 2 INCH , 1,130 FEET OF 4 INCH POLY ALONG COWAN
STREET AND ABANDON 16 FEET OF 2 INCH STEEL, 160 FEET OF 3 INCH POLY, 1,170
FEET OF 3 INCH STEEL, 120 FEET OF 4 INCH POLY, 1,045 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS MART SYSTEM INTEGRITY JUNE
4675 080.74491 2,539
RELOCATE FACILITIES. INSTALL 180 FEET OF 4 INCH AND 26 FEET OF 2 INCH POLY
AND ABANDON 180 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DALLAS
TXDOT ROADWAY PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
4676 080.74492 163,808
INSTALL 1,300 FEET OF 4 INCH POLY ALONG MOUSER WAY IN MANSFIELD,
TARRANT COUNTY. ALL CUSTOMERS MANSFIELD GROWTH DECEMBER
4677 080.74493 181,573
INSTALL 2,800 FEET OF 2 INCH AND 2,000 FEET OF 4 INCH POLY ALONG THE
STREETS OF NEW WATSON BRANCH SUBDIVISION IN MANSFIELD, TARRANT
COUNTY. RESIDENTIAL MANSFIELD GROWTH DECEMBER
4678 080.74496 11,413
INSTALL 570 FEET OF 4 INCH AND 2,840 FEET OF 2 INCH POLY ALONG THE
STREETS OF SKYLINE ESTATES SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTCHINS GROWTH SEPTEMBER
4679 080.74499 412,173
INSTALL 2,426 FEET OF 6 INCH POLY ALONG THE STREETS OF NORTH GROVE
BLVD IN THE CITY OF WAXAHACHIE. ALL CUSTOMERS WAXAHACHIE GROWTH DECEMBER
4680 080.74501 44,213
RELOCATE FACILITIES. INSTALL 1000 FEET OF 2 INCH POLY AND ABANDON 1000
FEET OF 2 INCH POLY ALONG CINNABAR DRIVE TO ACCOMODATE CITY OF DALLAS
STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
4681 080.74505 35,619
RELOCATE FACILITIES. INSTALL 50 FEET OF 4 INCH POLY AND ABANDON 50 FEET
OF 4 INCH POLY ALONG GREENVILLE AVENUE TO ACCOMMODATE DEVELOPER
INSTALLED FACILITY. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES APRIL
4682 080.74508 46,852
INSTALL 200 FEET OF 2 INCH POLY AND 110 FEET OF 4 INCH STEEL ALONG THE
STREETS OF WILLOW CREEK RETAIL CENTER.
COMMERCIAL OR
INDUSTRIAL ANNA GROWTH SEPTEMBER
4683 080.74509 50,617
INSTALL 627 FEET OF 4 INCH POLY ALONG THE STREETS OF CLEAR CREEK RANCH
SUBDIVISION. DEVELOP INSTALLED FACILITIES. ALL CUSTOMERS ROUND ROCK GROWTH SEPTEMBER
4684 080.74510 1,445
INSTALL 290 FEET OF 4 INCH POLY AND ABANDON 299 FEET OF 3 INCH STEEL AND
64 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY OCTOBER
4685 080.74511 560,723
INSTALL 2,910 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 4 INCH, 2215
FEET OF 3 INCH AND 375 FEET OF 8 INCH STEEL ALONG THE STREETS OF COOGAN
DRIVE AND ROYAL LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4686 080.74514 632,553
INSTALL 3,395 FEET OF 2 INCH POLY NEAR THE INTERSECTION OF ALLEGHENY
DRIVE AND COOGAN DRIVE AND ABANDON 902 FEET OF 2 INCH, 2,790 FEET OF 3
INCH STEEL AND 300 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4687 080.74515 832,176
INSTALL 3,270 FEET OF 2 INCH AND 1,010 FEET OF 4 INCH POLY AND ABANDON 575
FEET OF 2 INCH, 2,325 FEET OF 3 INCH AND 1,005 FEET OF 6 INCH STEEL ALONG
THE ALLEY NORTH AND SOUTH OF FLOWERDALE LANE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 139 of 178
358
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4688 080.74532 783,805
INSTALL 1,635 FEET OF 2 INCH AND 1,915 FEET OF 4 INCH POLY ALONG
WOODWIND STREET AND ABANDON 1,100 FEET OF 2 INCH, 1,815 FEET OF 4 INCH
AND 430 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4689 080.74533 93,883
INSTALL 2,750 FEET OF 2 INCH POLY ALONG THE STREETS OF THE WEST
CROSSING SUBDIVISION IN ANNA. RESIDENTIAL ANNA GROWTH OCTOBER
4690 080.74534 157,165
INSTALL 3,520 FEET OF 2 INCH AND 900 FEET OF 6 INCH POLY ALONG THE
STREETS OF WEST CROSSING SUBDIVISION IN ANNA. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL ANNA GROWTH DECEMBER
4691 080.74539 1,630,174
INSTALL 3,000 FEET OF 16 INCH STEEL AND ABANDON 3,000 FEET OF 16 INCH
STEEL ALONG ALEMEDA STREET IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JULY
4692 080.74540 (468) INSTALL 635 FEET OF 2 INCH POLY ALONG TANANGER SPRINGS ROAD. RESIDENTIAL DENISON GROWTH JANUARY
4693 080.74543 61,842
INSTALL 1,420 FEET OF 2 INCH POLY ALONG THE STREETS OF TRINITY FALLS PU7-
4 IN MCKINNEY. RESIDENTIAL MCKINNEY GROWTH JULY
4694 080.74544 45,348
INSTALL 2421 FEET OF 2 INCH, 2872 FEET OF 4 INCH AND 1097 FEET OF 8 INCH
POLY ALONG THE STREETS OF SALERNO PHASE 2 AND 3. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL ROUND ROCK GROWTH JULY
4695 080.74545 903,152
INSTALL 3,750 FEET OF 2 INCH POLY ALONG KRAFT STREET AND ABANDON 3,175
FEET OF 2 INCH AND 105 FEET OF 1.25 INCH STEEL AND 470 FEET OF 2 INCH POLY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JULY
4696 080.74553 (4,725)
ABANDON 4,101 FEET OF 6 INCH AND 2,135 FEET OF 2 INCH STEEL ALONG THE
STREETS OF WILMER IN DALLAS COUNTY. ALL CUSTOMERS WILMER
RELOCATION OF
FACILITIES OCTOBER
4697 080.74554 20,352
INSTALL 700 FEET OF 4 INCH POLY ALONG LAKESIDE VILLAGE BOULEVARD AND
LAKESIDE PARKWAY INTERSECTION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FLOWER MOUND GROWTH JUNE
4698 080.74556 119,945
INSTALL 2585 FEET OF 2 INCH POLY ALONG SHAW STREET AND ABANDON 2555
FEET OF 2 INCH STEEL AND 30 FEET OF 2 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4699 080.74559 67,730
INSTALL 2600 FEET OF 2 INCH POLY ALONG LIFE AVENUE AND ABANDON 2515
FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4700 080.74565 512,058
INSTALL 3,288 FEET OF 4 INCH, 5 FEET OF 2 INCH POLY ALONG OLD LIMESTONE
COUNTY ROAD AND ABANDON 202 FEET OF 2 INCH, 2,055 FEET OF 4 INCH STEEL
AND 1,025 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY DECEMBER
4701 080.74568 855,161
INSTALL 2,500 FEET OF 2 INCH AND 1,150 FEET OF 4 INCH POLY ALONG GRIM
AVENUE AND GORMAN AVENUE IN WACO AND ABANDON 2,100 FEET OF 2 INCH,
740 FEET OF 4 INCH STEEL AND 302 FEET OF 2 INCH AND 470 FEET OF 4 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
4702 080.74571 148,989
INSTALL 175 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY AND DISTRICT
REGULATOR STATION #01 AND ABANDON 375 FEET OF 3 INCH STEEL AND
DISTRICT REGULATOR STATION #01 ALONG MAIN STREET IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAINT JO SYSTEM INTEGRITY DECEMBER
4703 080.74572 125,790
INSTALL DISTRICT REGULATOR STATION #02 ALONG SOUTH LINE STREET IN SAINT
JO AND ABANDON DISTRICT REGULATOR STATION #02 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAINT JO SYSTEM INTEGRITY DECEMBER
4704 080.74573 74,372
INSTALL 2130 FEET OF 4 INCH POLY AND 3615 FEET OF 2 INCH POLY ALONG THE
STREETS IF SENDERA RANCH DEVELOPMENT. RESIDENTIAL FORT WORTH GROWTH JULY
4705 080.74574 201,095
INSTALL 1,574 FEET OF 4 INCH AND 478 FEET OF 2 INCH AND 852 FEET OF 8 INCH
POLY ALONG THE STREETS OF VENTAN SUBDIVSION. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER
4706 080.74575 176,255
INSTALL 1,880 FEET OF 2 INCH POLY ALONG HOUSTON STREET AND CUTLER
STREET IN TIOGA AND ABANDON DISTRICT REGULATOR STATION #01 AND 947
FEET OF 4 INCH, 3 FEET OF 3 INCH STEEL AND 1,380 FEET OF 4 INCH AND 61 FEET
OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS TIOGA SYSTEM INTEGRITY DECEMBER
4707 080.74578 3
INSTALL 400 FEET OF 2 INCH POLY ALONG TM WEST PARKWAY. DEVELOPER
INSTALLED FACILITIES. ALL CUSTOMERS WEST GROWTH JANUARY
4708 080.74580 3,934
INSTALL DISTRICT REGULATOR STATION 01 ALONG WEST MAIN STREET AND
ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELLS SYSTEM INTEGRITY OCTOBER
4709 080.74582 133,709
INSTALL DISTRICT REGULATOR STATION #06 AT INTERSECTION OF NORTH BOND
STREET AND EAST ALAMEDA STREET IN IOWA PARK AND ABANDON REGULATOR
DISTRICT STATION #06 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY DECEMBER
4710 080.74583 93,343
INSTALL DISTRICT REGULATOR STATION #07 AT THE INTERSECTION OF NORTH
COLORADO STREET AND WEST TEXAS AVENUE IN IOWA PARK AND ABANDON
DISTRICT REGULATOR STATION #07 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY DECEMBER
4711 080.74586 91,578
INSTALL DISTRICT REGULATOR STATION #101 AND 125 FEET OF 2 INCH AND 50
FEET OF 4 INCH POLY ALONG PARK STREET AND ABANDON 20 FEET OF 2 INCH, 50
FEET OF 4 INCH POLY AND 10 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR
STATION #101 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY JULY
4712 080.74589 263,787
INSTALL 2,500 FEET OF 2 INCH POLY AND ABANDON 1,842 FEET OF 2 INCH POLY,
80 FEET OF 2 INCH, 463 FEET OF 3 INCH STEEL AND 4 FEET OF 3 INCH POLY AND
DISTRICT REGULATOR STATION 11 IN VAN ALSTYNE, GRAYSON COUNTY. ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY DECEMBER
4713 080.74591 157,063
INSTALL 325 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #53
ALONG NORTH BROADWAY STREET AND ABANDON 19 FEET OF 3 INCH, 303 FEET
OF 4 INCH, AND 16 FEET OF 6 INCH POLY AND 41 FEET OF 3 INCH AND 12 FEET OF
4 INCH STEEL AND DISTRICT REGULATOR STATION #53 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
4714 080.74592 210,207
INSTALL 975 FEET OF 2 INCH AND 45 FEET OF 4 INCH POLY AND DISTRICT
REGULATOR STATION #20 ALONG 15TH STREET AND ABANDON 1,125 FEET OF 4
INCH, 23 FEET OF 2 INCH POLY AND 109 FEET OF 4 INCH, 25 FEET OF 8 INCH AND
385 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
4715 080.74593 310,866
INSTALL 5,600 FEET OF 2 INCH POLY ALONG THE ALLEYS OF PHASE 1 OF CITY
POINT. RESIDENTIAL NORTH RICHLAND HILLS GROWTH JUNE
4716 080.74595 169,449
INSTALL 2,640 FEET OF 2 INCH POLY ALONG THE STREETS OF CITY POINT
SUBDIVISION IN NORTH RICHLAND HILLS, TARRANT COUNTY. RESIDENTIAL NORTH RICHLAND HILLS GROWTH DECEMBER
4717 080.74599 213,980
INSTALL DISTRICT REGULATOR STATION #25 AT THE INTERSECTION OF NORTH
AVENUE B AND EAST MAIN STREET IN OLNEY AND ABANDON DISTRICT
REGULATOR STATION #25 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS OLNEY SYSTEM INTEGRITY OCTOBER
4718 080.74600 671
INSTALL 3170 FEET OF 2 INCH POLY ALONG THE STREETS OF MORNINGSTAR
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH APRIL
4719 080.74601 8,732
INSTALL 290 FEET OF 2 INCH POLY AND 150 FEET OF 4 INCH POLY AND ABANDON
460 FEET OF 2 INCH POLY AND 140 FEET OF 3 INCH POLY ALONG AMHERST DRIVE
TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY OCTOBER
4720 080.74603 151,274
INSTALL DISTRICT REGULATOR STATION #08 ALONG HUGHES STREET IN QUANAH
AND ABANDON DISTRICT REGULATOR STATION #08 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY DECEMBER
4721 080.74604 145,421
INSTALL DISTRICT REGULATOR STATION #13 AND 500 FEET OF 2 INCH, 45 FEET OF
4 INCH POLY ALONG MERCER STREET IN QUANAH AND ABANDON DISTRICT
REGULATOR STATION #13 AND 133 FEET OF 2 INCH AND 37 FEET OF 4 INCH STEEL
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY DECEMBER
4722 080.74605 539
INSTALL 630 FEET OF 2 INCH POLY ALONG WOOD STREET. DEVELOPER INSTALLED
FACILITIES.
COMMERCIAL OR
INDUSTRIAL ATHENS GROWTH MARCH
MTX Additions
Page 140 of 178
359
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4723 080.74606 125,718
INSTALL DISTRICT REGULATOR STATION #01 ALONG ALBERT BROADFOOT STREET
IN BONHAM AND ABANDON DISTRICT REGULATOR STATION #01 IN ACCORDANCE
WITH THE RAILROAD COMMSSION TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY SEPTEMBER
4724 080.74609 307,824
INSTALL DISTRICT REGULATOR STATION #20 AND ABANDON DISTRICT REGULATOR
STATION #20 IN DENISON, GRAYSON COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY DECEMBER
4725 080.74610 71,963
INSTLL 30 FEET OF 2 INCH AND 40 FEET OF 4 INCH POLY AND DISTRICT
REGULATOR STATION #04 ALONG WEST FERN STREET AND NORTH WOODS
STREET IN SHERMAN AND ABANDON DISTRICT REGULATOR STATION #04. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY DECEMBER
4726 080.74615 52,737
INSTALL 2550 FEET OF 4 INCH AND 135 FEET OF 2 INCH POLY ALONG THE STREETS
OF DALLAS AND ABANDON 2570 FEET OF 2 INCH STEEL AND 75 FEET OF 2 INCH
POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4727 080.74617 215,156
INSTALL 870 FEET OF 4 INCH POLY ALONG SHEPHERD STREET AND ABANDON 847
FEET OF 4 INCH STEEL ADN 25 FEET OF 4 INCH POLY TO ELIMINATE
UNREPAIRABLE LEAK IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY DECEMBER
4728 080.74619 864
RELOCATE FACILITIES. INSTALL 32 FEET OF 4 INCH POLY ALONG MORGAN
AVENUE AND ABANDON 22 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF
DALLAS STORM SEWER PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
4729 080.74623 533,423
INSTALL 1,812 FEET OF 4 INCH, 510 FEET OF 2 INCH POLY ALONG MOBERLY
STREET AND ABANDON 2,282 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
4730 080.74625 337,916
INSTALL 1480 FEET OF 2 INCH POLY ALONG HOMELAND STREET AND ABANDON
1285 FEET OF 2 INCH STEEL AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4731 080.74629 5,651
INSTALL 2,207 FEET OF 4 INCH AND 3,623 FEET OF 2 INCH POLY ALONG THE
STREETS OF PARMER RANCH SUBDIVISION. DEVEOLOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER
4732 080.74630 61,034
INSTALL 5,419 FEET OF 4 INCH AND 4,720 FEET OF 2 INCH POLY ALONG THE
STREETS OF LIVELY TRACT SUBDIVISION IN GEORGETOWN. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
4733 080.74631 143,530
RELOCATE FACILITIES. RELOCATE 11 SERVICE LINES IN THE CITY OF KELLER IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY SEPTEMBER
4734 080.74633 155,144
RELOCATE FACILITIES. INSTALL 501 FEET OF 4 INCH POLY AND ABANDON 501
FEET OF STEEL ALONG PEARSON LANE.
INSTALL 107 FEET OF 2 INCH POLY AND ABANDON 170 FEET OF 2 INCH STEEL
ALONG BOURLAND ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY OCTOBER
4735 080.74636 170,142
RELOCATE FACILITIES. INSTALL 45 FEET OF 2 INCH POLY AND ABANDON 45 FEET
STEEL ALONG CHANDLER ROAD. INSTALL 67 FEET OF 4 INCH POLY AND ABANDON
67 FEET OF 4 INCH STEEL ALONG SOUTH PATE ORR ROAD IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY OCTOBER
4736 080.74642 968,300
INSTALL 790 FEET OF 2 INCH AND 3,150 FEET OF 4 INCH POLY ALONG MEREDITH
FROM SOUTH COCKRELL HILL TO SOUTH GILPIN AVENUE IN DALLAS AND
ABANDON 250 FEET OF 2 INCH AND 3,700 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4737 080.74643 118,234
INSTALL 1,000 FEET OF 2 INCH POLY ALONG PINE STREET AND ABANDON 460 FEET
OF 4 INCH STEEL, AND 25 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY JULY
4738 080.74644 194,226
RELOCATE FACILITIES. INSTALL 845 FEET OF 4 INCH POLY AND ABANDON 545
FEET OF 2 INCH STEEL, 460 FEET OF 4 INCH STEEL, AND 385 FEET OF 4 INCH POLY
ALONG COLLINS STREET TO ACCOMODATE CITY OF ARLINGTON IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES OCTOBER
4739 080.74645 1,957,175
INSTALL 7,353 FEET OF 12 INCH POLY ALONG THE STREETS OF SILO MILLS
SUBDIVISION IN JOSHUA. ALL CUSTOMERS JOSHUA GROWTH DECEMBER
4740 080.74647 620,545
INSTALL 1,790 FEET OF 2 INCH AND 635 FEET OF 4 INCH POLY AND ABANDON 1,790
FEET OF 2 INCH AND 635 FEET OF 4 INCH STEEL ALONG SOUTH GILPIN IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4741 080.74648 697,742
INSTALL 1,550 FEET OF 8 INCH POLY ALONG DAVIS STREET, INSTALL 1,295 FEET
OF 2 INCH POLY ALONG CRANFORD STREET AND ABANDON 440 FEET OF 4 INCH
POLY, 610 FEET OF 4 INCH, 390 FEET OF 3 INCH, 110 FEET OF 2 INCH 1,665 FEET OF
6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY DECEMBER
4742 080.74649 536
INSTALL 310 FEET OF 4 INCH AND 940 FEET OF 2 INCH POLY ALONG NOLAN DRIVE.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL SOUTHLAKE GROWTH OCTOBER
4743 080.74650 1,490,392
INSTALL 1,370 FEET OF 2 INCH AND 5,055 FEET OF 4 INCH POLY AND ABANDON 54
FEET OF 1.25 INCH, 3,295 FEET OF 2 INCH, 320 FEET OF 3 INCH , AND 6,639 FEET
OF 4 INCH STEEL, 915 FEET OF 4 INCH, 1,937 FEET OF 2 INCH POLY ALONG THE
STREETS OF THE CITY OF GORMAN IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORMAN SYSTEM INTEGRITY DECEMBER
4744 080.74653 4,529 INSTALL 140 FEET OF 2 INCH POLY ALONG BLACKLAND COURT. RESIDENTIAL DALLAS GROWTH JULY
4745 080.74655 6,437,105
INSTALL 24,715 FEET OF 8 INCH STEEL FROM V36 TO L8C ALONG WILLIAM FITCH
PARKWAY IN COLLEGE STATION. ALL CUSTOMERS COLLEGE STATION
SYSTEM
IMPROVEMENT DECEMBER
4746 080.74657 257,563
INSTALL 1,320 FEET OF 4 INCH POLY AND ABANDONING 1,312 FEET OF 4 INCH
STEEL ALONG THE ALLEY OF LAGONA AVE AND DENVER AVE IN ACCORDANCE
WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4747 080.74660 29,173
INSTALL 1,040 FEET OF 4 INCH POLY ALONG CEDARDALE ROAD AND
HONEYSUCKLE ROAD IN DALLAS.
COMMERCIAL OR
INDUSTRIAL DALLAS GROWTH DECEMBER
4748 080.74662 3,497 INSTALL 100 FEET OF 2 INCH POLY ALONG SCOTT LANE. RESIDENTIAL PILOT POINT GROWTH SEPTEMBER
4749 080.74663 482,395
INSTALL 1,890 FEET OF 2 INCH POLY ALONG PROVINCE LANE ALLEY AND
ABANDON 1,890 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4750 080.74664 677,619
INSTALL 3,090 FEET OF 2 INCH POLY ALONG LARRY DRIVE ALLEY AND ABANDON
3,090 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4751 080.74665 809,970
INSTALL 3,140 FEET OF 2 INCH POLY AND ABANDON 1,700 FEET OF 3 INCH, 1440
FEET OF 3 INCH STEEL ALONG HEALEY DRIVE ALLEY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4752 080.74666 1,151,858
INSTALL 3,775 FEET OF 2 INCH POLY AND ABANDON 3,775 FEET OF 2 INCH STEEL
ALONG ORLANDO COURT AND MATHER COURT IN ACCORDANCE WITH RAILROAD
COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4753 080.74667 41,301
INSTALL 3,000 FEET OF 2 INCH, 600 FEET OF 6 INCH POLY ALONG THE STREETS OF
AUSTIN'S COLONY PHASE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH OCTOBER
4754 080.74668 98,395
INSTALL A HALF SOLE TO ADDRESS LONG SEAM ANOMALIES IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4755 080.74669 235,920
INSTALL 2,247 FEET OF 2 INCH POLY ALONG MILBY ROAD AND ABANDON 300 FEET
OF 2 INCH STEEL AND 1,855 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER
4756 080.74671 407,006
INSTALL 2,853 FEET OF 2 INCH POLY ALONG JAMES STREET AND GARDEN PARK
COURT AND ABANDON 1,675 FEET OF 2 INCH STEEL AND 755 FEET OF 2 INCH POLY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER
4757 080.74672 421,471
INSTALL 3,081 FEET OF 2 INCH POLY ALONG CALES DRIVE AND ABANDON 2,650
FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
4758 080.74673 419,733
INSTALL 2,518 FEET OF 2 INCH POLY ALONG PONTIAC DRIVE AND ABANDON 1,460
FEET OF 3 INCH, 535 FEET OF 4 INCH STEEL, 670 FEET OF 4 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
4759 080.74674 313,853
INSTALL 1,931 FEET OF 4 INCH AND 1,018 FEET OF 2 INCH POLY ALONG STRAIT
LANE AND MIBLY ROAD AND ABANDON 1,455 FEET OF 3 INCH STEEL, AND 210 FEET
OF 3 INCH, 1,140 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
MTX Additions
Page 141 of 178
360
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4760 080.74675 386,804
INSTALL 1,469 FEET OF 4 INCH AND 877 FEET OF 2 INCH POLY ALONG CLOVER
PARK DRIVE AND ABANDON 1,380 FEET OF 4 INCH, 480 FEET OF 2 INCH STEEL, 100
FEET OF 2 INCH AND 320 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
4761 080.74676 557,309
INSTALL 922 FEET OF 4 INCH AND 1,917 FEET OF 2 INCH POLY ALONG PONTIAC
DRIVE AND LOMBARDY LANE IN ARLINGTON AND ABANDON 1,905 FEET OF 3 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
4762 080.74677 567,758
INSTALL 2,667 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY ALONG PECANDALE
DRIVE AND WAGGONER DRIVE IN ARLINGTON AND ABANDON 2,660 FEET OF 4
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
4763 080.74678 422,926
INSTALL 2,345 FEET OF 4 INCH AND 847 FEET OF 2 INCH POLY ALONG RAVENWOD
DRIVE, PONTIAC DRIVE AND WESTVIEW TERRACE IN ARLINGTON. ABANDON 2,360
FEET OF 4 INCH AND 590 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
4764 080.74679 401,041
INSTALL 1,320 FEET OF 4 INCH AND 938 FEET OF 2 INCH POLY ALONG ARTHUR
DRIVE AND SHERWOOD DRIVE AND ABANDON 1,305 FEET OF 4 INCH, 520 FEET OF
3 INCH AND 115 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
4765 080.74680 532,199
INSTALL 1,598 FEET OF 4 INCH AND 1,506 FEET OF 2 INCH POLY ALONG EASY
STREET, VALLEY AVE AND WESTCREST DRIVE IN ARLINGTON AND ABANDON 1,600
FEET OF 4 INCH, 1,050 FEET OF 3 INCH AND 220 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
4766 080.74681 482,151
INSTALL 2,402 FEET OF 4 INCH POLY ALONG WAGGONER DRIVE, WHITNEY LANE
AND TURPIN DRIVE IN ARLINGTON AND ABANDON 2,335 FEET OF 4 INCH STEEL
AND 55 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
4767 080.74682 308,607
INSTALL 1,221 FEET OF 4 INCH AND 321 FEET OF 2 INCH POLY ALONG DUNCAN
COURT AND RAVENWOOD DRIVE IN ARLINGTON. ABANDON 1,140 FEET OF 4 INCH
AND 320 FEET OF 2 INCH STEEL, 80 FEET OF 4 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER
4768 080.74684 1,333,741
INSTALL 4,435 FEET OF 2 INCH POLY ALONG SOUTH RANDOLPH DRIVE AND
ABANDON 4,405 FEET OF 2 INCH STEEL AND 30 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4769 080.74685 21,869
RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY AND ABANDON 330
FEET OF 4 INCH, 10 FEET OF 3 INCH STEEL AND 50 FEET OF 3 INCH AND 10 FEET
OF 4 INCH POLY ALONG ENNIS AVENUE TO ACCOMODATE CITY OF FORT WORTH
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4770 080.74686 25,112
INSTALL 225 FEET OF 2 INCH POLY ALONG PRIVATE DRIVE IN THE CITY OF
COLLEGE STATION. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL COLLEGE STATION GROWTH SEPTEMBER
4771 080.74688 109
INSTALL 335 FEET OF 2 INCH POLY ALONG JUNCTION DRIVE. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL BRYAN GROWTH JUNE
4772 080.74691 76,688
INSTALL 510 FEET OF 2 INCH POLY ALONG MEDPARK DRIVE IN DENTON, DENTON
COUNTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL DENTON GROWTH DECEMBER
4773 080.74692 154,215
RELOCATE FACILITIES. RELOCATE 147 FEET OF 2 INCH, 30 FEET OF 6 INCH POLY
AND ABANDON 22 FEET OF 6 INCH POLY ALONG CALDWELLS LANE AND RUSSELL
STREET IN PFLUGERVILLE, TRAVIS COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PFLUGERVILLE SYSTEM INTEGRITY DECEMBER
4774 080.74693 289,318
INSTALL 1,739 FEET OF 4 INCH POLY ALONG THE ALLEY OF GOULD AVENUE AND
DENVER AVENUE AND ABANDON 1,341 FEET OF 4 INCH, 451 FEET OF 6 INCH STEEL
IN ACCORANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4775 080.74694 4,995
REPLACE (126) STEEL SERVICE LINES WITH POLY SERVICE LINES IN BRYAN IN
ACCORDANCE WITH RAILROAD COMMISION RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER
4776 080.74695 148,814
INSTALL 2950 FEET OF 2 INCH AND 2022 FEET OF 4 INCH POLY ALONG THE
STREETS OF HONEY CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH JULY
4777 080.74696 198,386
INSTALL 1890 FEET OF 4 INCH AND 4690 FEET OF 2 INCH POLY ALONG THE
STREETS OF LETARA SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HASLET GROWTH DECEMBER
4778 080.74701 160 INSTALL 100 FEET OF 2 INCH POLY ALONG MERVINS RUN. RESIDENTIAL BRYAN GROWTH APRIL
4779 080.74702 412,436
INSTALL 2,970 FEET OF 2 INCH, 1,425 FEET OF 4 INCH AND 1,080 FEET OF 6 INCH
POLY ALONG THE STREETS OF AVALON. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARGYLE GROWTH OCTOBER
4780 080.74703 931,347
INSTALL 2,800 FEET OF 8 INCH AND 30 FEET OF 4 INCH POLY AND ABANDON 2,690
FEET OF 8 INCH, 30 FEET OF 4 INCH STEEL AND 85 FEET OF 8 INCH POLY ALONG
CAMP WISDOM AND BLUEWOOD ROAD IN ACCORDANCE WITH RAILROAD
COMMISISON OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4781 080.74704 100,720
INSTALL DISTRICT REGULATOR STATION #01 ALONG WEST WICHITA STREET AND
COWAN STREET IN BOWIE AND ABANDON DISTRICT REGULATOR STATION #01 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE SYSTEM INTEGRITY DECEMBER
4782 080.74705 100,368
INSTALL DISTRICT REGULATOR STATION #03 ALONG NORTH MILL STREET AND
EAST NELSON STREET IN BOWIE AND ABANDON DISTRICT REGULATOR STATION
#03 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE SYSTEM INTEGRITY SEPTEMBER
4783 080.74706 159,826
INSTALL DISTRICT REGULATOR STATAION #09 ALONG HIGHWAY 59 SOUTH AND US
HIGHWAY 287 IN BOWIE AND ABANDON DISTRICT REGULATOR STATION #09 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE SYSTEM INTEGRITY DECEMBER
4784 080.74708 15,438
INSTALL 250 FEET OF 6 INCH POLY ALONG US 380 AND CYPRESS BEND PARKWAY.
DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PRINCETON GROWTH DECEMBER
4785 080.74709 559,688
INSTALL 2,360 FEET OF 2 INCH AND 215 FEET OF 4 INCH POLY AND ABANDON
2,345 FEET OF 3 INCH, 215 FEET OF 4 INCH STEEL AND 15 FEET OF 3 INCH POLY
ALONG THE ALLEY BETWEEN BLUEWOOD AND CLEARWOOD IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4786 080.74710 6,499
RELOCATE FACILITIES. INSTALL 2150 FEET OF 6 INCH AND 20 FEET OF 4 INCH
POLY ALONG WEST BAILEY BOSWELL ROAD AND ABANDON 1950 FEET OF 4 INCH
STEEL, 100 FEET OF 4 INCH AND 70 FEET OF 6 INCH POLY TO ACCOMMODATE THE
CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4787 080.74711 227,009
INSTALL 5,930 FEET OF 2 INCH ALONG STREETS OF TREES FARM SUBDIVISION.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DESOTO GROWTH SEPTEMBER
4788 080.74712 1,680
RELOCATE FACILITIES. INSTALL 30 FEET OF 4 INCH POLY AND ABANDON 30 FEET
OF 3 INCH STEEL ALONG 5TH STREET TO ACCOMMODATE THE CITY OF ANNA
STREET PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE
8.209. ALL CUSTOMERS ANNA
RELOCATION OF
FACILITIES OCTOBER
4789 080.74719 359,533
INSTALL 1,450 FEET OF 4 INCH, 30 FEET OF 2 INCH AND 10 FEET OF 4 INCH STEEL
AND DISTRICT REGULATOR STATION #02 ALONG WEST AVENUE E AND ALLEY
BETWEEN 5TH AND 7TH STREET IN MIDLOTHIAN AND ABANDON 365 FEET OF 4
INCH STEEL AND 535 FEET OF 4 INCH, 770 FEET OF 2 INCH POLY AND DISTRICT
REGULATOR STATION #02 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY DECEMBER
4790 080.74722 7,362
INSTALL 590 FEET OF 4 INCH POLY ALONG THE STREETS OF COMMERICAL
CUSTOMER EPIC CENTRAL DEVELOPMENT IN GRAND PRAIRIE, TX.
COMMERCIAL OR
INDUSTRIAL GRAND PRAIRIE GROWTH JUNE
4791 080.74726 1,177
RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY ALONG MEACHAM
BOULEVARD AND ABANDON 400 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF
FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISISON OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY
RELOCATION OF
FACILITIES OCTOBER
4792 080.74728 210,634
INSTALL 3,170 FEET OF 2 INCH POLY ALONG THE STREETS OF TRADITION PHASE
3A SUBDIVISION. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER
4793 080.74729 280,486
INSTALL 2,680 FEET OF 2 INCH AND 1,635 FEET OF 6 INCH POLY ALONG THE
STREETS OF TRADITION SUBDIVISION IN FORT WORTH. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4794 080.74730 133,473
INSTALL 3,392 FEET OF 4 INCH POLY ALONG THE STREETS OF SIERRA VISTA
SUBDIVISION IN FORT WORTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER
MTX Additions
Page 142 of 178
361
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4795 080.74732 71 INSTALL 100 FEET OF 2 INCH POLY ALONG SADDLEBACK LANE. RESIDENTIAL SOUTHLAKE GROWTH DECEMBER
4796 080.74734 12,340
INSTALL 1330 FEET OF 4 INCH POLY ALONG HALTOM ROAD. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL HALTOM CITY GROWTH JUNE
4797 080.74739 507,463
INSTALL 1,175 FEET OF 4 INCH, 2,800 FEET OF 2 INCH POLY AND ABANDON 2,675
FEET OF 2 INCH STEEL ALONG SAMBROSA LANE IN ACCORDANCE WITH RAILROAD
COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
4798 080.74746 (42,504)
INSTALL 1,400 FEET OF 8 INCH POLY AND ABANDON 1,400 OF 4 INCH POLY ALONG
CHALLENGER ROAD. ALL CUSTOMERS MIDLOTHIAN
SYSTEM
IMPROVEMENT AUGUST
4799 080.74747 365,793
INSTALL 2,214 FEET OF 2 INCH POLY ALONG CORSICANA STREET AND ABANDON
415 FEET OF STEEL, 708 FEET OF 3 INCH, 1,745 FEET OF 2 INCH STEEL AND 228
FEET OF 4 INCH, 84 FEET OF 3 INCH, 420 FEET OF 2 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY DECEMBER
4800 080.74749 45,306
INSTALL 3740 FEET OF 2 INCH POLY AND 620 FEET OF 4 INCH POLY ALONG
GEORGE BOYCE ROAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MESQUITE GROWTH APRIL
4801 080.74750 46,243
INSTALL 12,090 WMR END POINTS TO COMMERCIAL METERS IN THE DALLAS
METRO AREA. ALL CUSTOMERS DALLAS
SYSTEM
IMPROVEMENT DECEMBER
4802 080.74751 199,952
INSTALL 3,440 FEET OF 2 INCH POLY ALONG THE STREETS OF WOLF CREEK
FARMS SUBDIVISION IN MELISSA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH OCTOBER
4803 080.74752 17,774
RELOCATE FACILITIES. INSTALL 280 FEET OF 4 INCH AND 405 FEET OF 2 INCH
POLY AND ABANDON 405 FEET OF 2 INCH AND 280 FEET OF 4 INCH STEEL ALONG
SHADOW LANE TO ACCOMODATE CITY OF IRVING STORM DRAIN PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
RELOCATION OF
FACILITIES OCTOBER
4804 080.74753 590,943
INSTALL 3,250 FEET OF 2 INCH POLY AND ABANDON 178 FEET OF 6 INCH, 967 FEET
OF 4 INCH STEEL, AND 66 FEET OF 4 INCH, 1,014 FEET OF 2 INCH POLY ALONG
CORSICANA STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209 ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY DECEMBER
4805 080.74755 3,248
INSTALL 20 FEET OF 4 INCH POLY AND NEW DISTRICT REGULATOR STATION 08
AND ABANDON 25 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION 08 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER
4806 080.74756 130,368 INSTALL DISTRICT REGULATOR STATION #121, 57 FEET OF 2 INCH, 30 FEET OF 4 INC ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
4807 080.74757 443,811
INSTALL 1,310 FEET OF 4 INCH, 526 FEET OF 6 INCH POLY AND ABANDON 1,329
FEET OF 4 INCH STTEL, 488 FEET OF 6 INCH POLY ALONG THE ALLEY OF GOULD
AVENUE AND DENVER AVENUE IN ACCORDANCE WITH TEXAS RAILROAD
COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
4808 080.74759 314,027
INSTALL 2750 FEET OF 2 INCH POLY AND ABANDON 1440 FEET OF 2 INCH, 1200
FEET OF 3 INCH STEEL AND 30 FEET OF 2 INCH POLY ALONG THE STREETS OF
DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4809 080.74762 (629)
REPLACE 460 FEET OF 4 INCH POLY ALONG FAROLA DRIVE AND ABANDON 145
FEET OF 3 INCH STEEL. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES DECEMBER
4810 080.74765 7,073
REPLACE 100 STEEL SERVICE LINES WITH POLY SERVICE LINES ON MAPSHEET IN
ACCORDANCE WITH RAILROAD COMMISION RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER
4811 080.74768 361,130
INSTALL 4000 FEET OF 8 INCH POLY ALONG THE STREETS OF CREEKSIDE
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROYSE CITY GROWTH DECEMBER
4812 080.74769 215,507
INSTALL 4500 FEET OF 2 INCH AND 1230 FEET OF 4 INCH POLY ALONG THE
STREETS OF CREEKSIDE SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH DECEMBER
4813 080.74771 1,605
RELOCATE FACILITIES. INSTALL 570 FEET OF 2 INCH POLY ALONG THE EASEMENT
OF MILLER ROAD AND ABANDON 550 FEET OF 3 INCH STEEL TO ACCOMMODATE
CITY OF GARLAND STREET PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
4814 080.74772 1,320,158
INSTALL 12,780 FEET OF 2 INCH, 770 FEET OF 4 INCH AND 3,300 FEET OF 6 INCH
POLY ALONG THE STREETS OF BRIDGEWATER SUBDIVISION IN MIDLOTHIAN, ELLIS
COUNTY. RESIDENTIAL MIDLOTHIAN GROWTH DECEMBER
4815 080.74773 1,584,313
INSTALL 16 INCH PIG TRAP AT PLANO SOUTH STATION, INSTALL 500 FEET OF 4
INCH ON D17-4-10 AND INSTALL TWO (2) REGULATOR STATIONS AT SANDEN
STATION IN WYLIE, COLLIN COUNTY. ALL CUSTOMERS WYLIE
SYSTEM
IMPROVEMENT DECEMBER
4816 080.74775 87,590 INSTALL DISTRICT REGULATOR STATION #126, 35 FEET OF 2 INCH AND 35 FEET OF 4 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
4817 080.74776 69,559 INSTALL 40 FEET OF 2 INCH AND 38 FEET OF 4 INCH POLY AND DISTRICT REGULATO ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
4818 080.74778 28,165
INSTALL 94 POLY SERVICES AND ABANDON 94 STEEL SERVICES IN WACO IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
4819 080.74779 5,755
RELOCATE FACILITIES. INSTALL 1075 FEET OF 4 INCH POLY ALONG MARBLEHEAD
DRIVE AND ABANDON 1050 FEET OF 6 INCH STEEL ITO ACCOMODATE CITY OF
DALLAS N ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
4820 080.74780 97,351 INSTALL 30 FEET OF 2 INCH AND 40 FEET OF 4 INCH AND DISTRICT REGULATOR STA ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY JUNE
4821 080.74782 702,617
INSTALL 3,205 FEET OF 2 INCH POLY ALONG ROSEMARY AND GARFIELD IN
DALLAS AND ABANDON 3,205 FEET OF 2I NCH STEE AND 50 FEET OF 2 INCH POLY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4822 080.74783 92,206 INSTALL 50 FEET OF 2 INCH AND 30 FEET OF 4 INCH POLY AND DISTRICT REGULATO ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY OCTOBER
4823 080.74785 253
RELOCATE FACILITIES. INSTALL 150 FEET OF 6 INCH POLY ALONG HEMPHILL
STREET AND ABANDON 150 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF
FORT WORTH ROAD CONSTRUCTION IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4824 080.74786 3,448
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY AND ABANDON 490
FEET OF 2 INCH POLY ALONG RIDGE ROAD WEST TO ACCOMODATE CITY OF
ROCKWALL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ROCKWALL
RELOCATION OF
FACILITIES OCTOBER
4825 080.74787 20,046 INSTALL 150 FEET OF 2 INCH POLY ALONG THE STREETS OF SOUTHLAKE. RESIDENTIAL SOUTHLAKE GROWTH DECEMBER
4826 080.74791 1,537 INSTALL 150 FEET OF 2 INCH POLY ALONG JUSTIN ROAD. ALL CUSTOMERS HIGHLAND VILLAGE GROWTH DECEMBER
4827 080.74794 973,604
INSTALL 2,640 FEET OF 2 INCH POLY ALONG GARFIELD ROAD AND PHINNEY IN
DALLAS AND ABANDON 2,560 FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4828 080.74798 4,240
RELOCATE FACILITIES. INSTALL 535 FEET OF 6 INCH POLY AND ABANDON 535
FFET OF 6 INCH POLY ALONG SHIVER DRIVE TO ACCOMMODATE CITY OF FORT
WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4829 080.74799 685,531
INSTALL 2,930 FEET OF 2 INCH POLY ALONG OGDEN AND HIGGINS IN DALLAS AND
ABANDON 2,850 FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4830 080.74805 46,540
INSTALL 1740 FEET OF 4 INCH AND 590 FEET OF 2 INCH POLY AND ABANDON 1771
FEET OF 4 INCH, 255 FEET OF 2 INCH STEEL AND 180 FEET OF 2 INCH POLY ALONG
THE STREETS OF SNYDER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY OCTOBER
4831 080.74806 84,505
STEEL AND POLY SQUEEZE REPLACEMENT AND INCREMENTAL TOOLS FOR USE
THROUGHOUT THE DIVISION. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT FEBRUARY
4832 080.74807 13,499
RELOCATE FACILITIES. INSTALL 22 FEET OF 6 INCH POLY ALONG LAKEWOOD
DRIVE AND ABANDON 20 FEET OF 6 INCH POLY TO ACCOMODATE DEVELOPER
FACILITIES. ALL CUSTOMERS BURLESON
RELOCATION OF
FACILITIES MARCH
4833 080.74808 97,145
INSTALL 215 FEET OF 2 INCH POLY ALONG NORTH MAIN STREET AND ABANDON
215 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BLUE RIDGE SYSTEM INTEGRITY DECEMBER
4834 080.74809 157,334 INSTALL 15 FEET OF 2 INCH AND 875 FEET OF 4 INCH POLY ALONG NORTH RIKE STR ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY DECEMBER
4835 080.74810 341,454
INSTALL 4,240 FEET OF 6 INCH, 120 FEET OF 4 INCH AND 1,750 FEET OF 2 INCH
POLY ALONG THE STREETS OF SILO MILLS SUBDIVSION IN CLEBURNE, JOHNSON
COUNTY. RESIDENTIAL CLEBURNE GROWTH DECEMBER
4836 080.74811 333,757
INSTALL 3,120 FEET OF 4 INCH AND 2,500 FEET OF 2 INCH POLY ALONG THE
STREETS OF SILO MILLS SUBDIVISION IN CLEBURNE, JOHNSON COUNTY. RESIDENTIAL CLEBURNE GROWTH DECEMBER
4837 080.74822 377,254
RELOCATE FACILITIES. INSTALL 1.098 FEET OF 6 INCH POLY AND 140 FEET OF 10
INCH STEEL AND ABANDON 1,078 FEET OF 6 INCH POLY AND 205 FEET OF 8 INCH
STEEL ALONG STATE HIGHWAY 66 AND DALROCK ROAD IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 143 of 178
362
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4838 080.74825 116,316
INSTALL 700 FEET OF 4 INCH POLY ALONG SPRINGLAKE PARKWAY AND ABANDON
790 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY JULY
4839 080.74830 64,527 INSTALL 30 FEET OF 2 INCH AND 30 FEET OF 4 INCH POLY AND DISTRICT REGULATO ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY JUNE
4840 080.74831 81,387 INSTALL DISTRICT STATION #23 AND 30 FEET OF 2 INCH, 30 FEET OF 4 INCH POLY IN ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY APRIL
4841 080.74834 1,480 INSTALL 100 FEET OF 2 INCH POLY ALONG CHISHOLM ROAD. RESIDENTIAL SAINT JO GROWTH MARCH
4842 080.74835 39,175 INSTALL 20 FEET OF 2 INCH AND&NBSP; DISTIRCT REGULATOR STATION #10 ALONG W ALL CUSTOMERS EASTLAND SYSTEM INTEGRITY OCTOBER
4843 080.74839 85,644 INSTALL 30 FEET OF 2 INCH AND 30 FEET OF 4 INCH POLY AND DISTRICT REGULATO ALL CUSTOMERS SANTA ANNA SYSTEM INTEGRITY DECEMBER
4844 080.74842 7,365
INSTALL 260 POLY SERVICE LINES AND ABANDON 260 STEEL SERVICE LINES IN
CORSICANA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY OCTOBER
4845 080.74845 399,517
INSTALL 1,300 FEET OF 2 INCH, 1,250 FEET OF 4 INCH POLY ALONG WALBURN
COURT AND ABANDON 2,610 FEET OF 2 INCH STEEL IN ACCORDANCE WITH TEXAS
RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JULY
4846 080.74847 388,642
INSTALL 2,390 FEET OF 2 INCH POLY ALONG NAVARRO STREET AND ABANDON
1,570 FEET OF 2 INCH, 730 FEET OF 4 INCH STEEL AND 60 FEET OF 3 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4847 080.74851 (648) INSTALL 300 FEET OF 2 INCH POLY ALONG EAST CEDAR STREET. RESIDENTIAL ECTOR GROWTH MARCH
4848 080.74854 313,557
INSTALL 1,815 FEET OF 2 INCH POLY ALONG BAYSIDE AND ABANDON 1,805 FEET
OF 2 INCH STEEL AND 10 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JULY
4849 080.74861 638
RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH POLY AND ABANDON 350
FFET OF 2 INCH POLY ALONG COMMANDER ROAD TO ACCOMMODATE CITY OF
FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4850 080.74863 4,015
INSTALL 900 FEET OF 2 INCH POLY ALONG STREETS OF GODLEY AND ABANDON
900 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GODLEY SYSTEM INTEGRITY OCTOBER
4851 080.74866 101,896 INSTALL DISTRICT REGULATOR STATION #04 AND 75 FEET OF 2 INCH AND 30 FEET O ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY OCTOBER
4852 080.74867 138,610
INSTALL 70 FEET OF 2 INCH, 300 FEET OF 4 INCH POLY AND DISTRICT REGULATOR
STATION #05 ALONG WICHITA STREET AND ABANDON 30 FEET OF 4 INCH POLY 185
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY DECEMBER
4853 080.74868 96,137
ABANDON DISTRICT REGULATOR STATION DRS01, 534 FEET OF 4 INCH STEEL AND
764 FEET OF 4 INCH POLY ALONG EAST WICHITA STREET IN HENRIETTA, CLAY
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY DECEMBER
4854 080.74869 203,745
INSTALL DISTRICT REGULATOR STATION DRS08, 40 FEET OF 2 INCH AND 180 FEET
OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS08 AND 20
FEET OF 2 INCH AND 45 FEET OF 6 INCH STEEL ALONG S RED RIVER STREET IN
HENRIETTA, CLAY COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY DECEMBER
4855 080.74873 105,220
INSTALL DISTRICT REGULATOR STATION 026 AND 30 FEET OF 2 INCH, 30 FEET OF 4
INCH POLY AND ABANDON DISTRICT REGULATOR STATION 026 AND 48 FEET OF 2
INCH, 63 FEET OF 4 INCH STEEL AND 8 FEET OF 4 INCH POLY ALONG 11TH STREET
IN WICHITA FALLS, WICHITA COUNTY. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
4856 080.74874 90,653
INSTALL DISTRICT REGULATOR STATION #09 ALONG EASTON STREET AND
GEORGIA STREET IN VERNON AND ABANDON DISTRICT REGULATOR STATION #09
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY DECEMBER
4857 080.74875 83,636
INSTALL DISTRICT REGULATOR STATION #10 ALONG BEAVER STREET AND MAIN
STREET IN VERNON AND ABANDON DISTRICT REGULATOR STATION #10 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY DECEMBER
4858 080.74877 98,233 INSTALL DISTRICT REGULATOR STATION #22, 45 FEET OF 2 INCH, 30 FEET OF 4 INCH ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
4859 080.74879 153,631 INSTALL DISTRICT REGULATOR STATION #103, 70 FEET OF 2 INCH AND 540 FEET OF ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
4860 080.74880 25,787
RELOCATE FACILITIES. INSTALL 50 FEET OF 12 INCH POLY AND ABANDON 30 FEET
OF 12 INCH STEEL ALONG LOVERS LANE TO ACCOMODATE CITY OF DALLAS
STORM DRAIN PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
4861 080.74881 736,968
INSTALL 3,950 FEET OF 4 INCH AND 450 FEET OF 2 INCH POLY ALONG CANADA
DRIVE AND ABANDON 3,790 FEET OF 4 INCH, 420 FEET OF 2 INCH STEEL, 40 FEET
OF 4 INCH AND 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JULY
4862 080.74885 32,299
INSTALL 2,561 FEET OF 8 INCH, 3,094 FEET OF 4 INCH AND 10,416 FEET OF 2 INCH
POLY ALONG THE STREETS OF TRAVISSO SUBDIVISION IN LEANDER, WILLIAMSON
COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
4863 080.74887 31,727 INSTALL 960 FEET OF 2 INCH POLY ALONG SAYERS LANE. RESIDENTIAL NORTH RICHLAND HILLS GROWTH DECEMBER
4864 080.74888 308,017
INTEGRITY DIGS AND REMEDIATION ALONG LINE D IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4865 080.74889 10,576
RELOCATE FACILITIES. INSTALL 1,575 FEET OF 8 INCH POLY ALONG HIGHWAY 290
IN MANOR AND ABANDON 1,945 FEET OF 8 INCH POLY. ALL CUSTOMERS MANOR
RELOCATION OF
FACILITIES DECEMBER
4866 080.74890 65,148
INSTALL 920 FEET OF 6 INCH POLY ALONG THE STREET OF COMMERCIAL
DEVELOPMENT IN WACO. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL WACO GROWTH DECEMBER
4867 080.74892 560
INSTALL 244 FEET OF 2 INCH POLY ALONG THE STREETS OF JOSHUA. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL JOSHUA GROWTH MARCH
4868 080.74893 307,002
INSTALL 1,540 FEET OF 2 INCH POLY ALONG PUGET STREET AND ABANDON 1,500
FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JULY
4869 080.74897 9,308
INSTALL 3010 FEET OF 6 INCH POLY AND ABANDON 7.3 MILES OF 10 INCH TO 18
INCH STEEL ALONG LINE B IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4870 080.74898 888,406 INSTALL 3,780 FEET OF 4 INCH AND 110 FEET OF 2 INCH POLY AND ABANDON 220 FE ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4871 080.74906 97,691 RELOCATE FACILITIES. INSTALL 1738 FEET OF 4 INCH AND 262 FEET OF 2 INCH POLY ALL CUSTOMERS KERRVILLE
RELOCATION OF
FACILITIES OCTOBER
4872 080.74909 542,442
INSTALL 2,500 FEET OF 2 INCH, 1,375 FEET OF 4 INCH POLY ALONG TITUS STREET
AND ABANDON 375 FEET OF 4 INCH POLY AND 3,500 FEET OF 6 INCH STEEL AND
DISTRICT REGULATOR STATION #28 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE
4873 080.74913 210
RELOCATE FACILITIES. INSTALL 20 FEET OF 4 INCH POLY ALONG PUTNAM DRIVE
AND ABANDON 6 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF GRAND
PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF
FACILITIES OCTOBER
4874 080.74915 171
INSTALL 275 FEET OF 2 INCH POLY ALONG BRYAN ROAD. DEVELOPER INSTALLED
FACILITIES.
COMMERCIAL OR
INDUSTRIAL BRYAN GROWTH MARCH
4875 080.74917 54,030
INSTALL 1340 FEET OF 2 INCH POLY ALONG THE STREETS OF TRINITY FALLS
DEVELOPMENT. RESIDENTIAL MCKINNEY GROWTH APRIL
4876 080.74918 66,803
INSTALL 1650 FEET OF 2 INCH POLY ALONG THE STREETS OF TALON HILL
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4877 080.74922 171,971
INSTALL 2305 FEET OF 4 INCH POLY AND 1470 FEET OF 2 INCH POLY ALONG THE
STREETS IF KELLER SPRINGS DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER
4878 080.74924 199,728
INSTALL 225 FEET OF 2 INCH POLY ALONG AINSWORTH AND ABANDON 245 FEET
OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4879 080.74925 670,630
INSTALL 2,792 FEET OF 2 INCH POLY ALONG ERATH STREET AND NORTH 44TH
STREET IN WACO AND ABANDON 2,562 FEET OF 2 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
4880 080.74927 33,384
INSTALL 1100 FEET OF 6 INCH POLY ALONG US 380 AND ABANDON 245 FEET OF 2
INCH STEEL AND 725 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY DECEMBER
4881 080.74930 141,739 RELOCATE FACILITIES. INSTALL 150 FEET OF 8 INCH AND 150 FEET OF 8 INCH POLY ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
4882 080.74931 75,779
RELOCATE FACILITIES. INSTALL 150 FEET OF 6 INCH POLY AND ABANDON 60 FEET
OF 6 INCH POLY ALONG STREETS OF MANSFIELD TO ACCOMODATE CITY OF
MANSFIELD STREETS PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 144 of 178
363
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4883 080.74934 3,557
INSTALL A HALF SOLE ALONG LINE DT3 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4884 080.74935 22,636
INSTALL 1,185 FEET OF 2 INCH POLY ALONG THE STREETS OF PATRIOT PLACE
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WICHITA FALLS GROWTH SEPTEMBER
4885 080.74937 28,209
INSTALL 2950 FEET OF 8 INCH POLY ALONG STREETS OF BALCH SPRINGS AND
ABANDON 2953 FEET OF 8 INCH STEEL AND 10 FEET OF 6 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALCH SPRINGS SYSTEM INTEGRITY OCTOBER
4886 080.74941 355,320 INSTALL 1500 FEET OF 8 INCH POLY ALONG WEATHERFORD ROAD.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH SEPTEMBER
4887 080.74943 108,728
INSTALL 2955 FEET OF 2 INCH AND 1565 FEET OF 4 INCH POLY ALONG THE
STREETS OF ARIA TOWNHOMES. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SACHSE GROWTH SEPTEMBER
4888 080.74945 45,368
INSTALL 5400 FEET OF 2 INCH POLY ALONG THE STREETS OF KENSINGTON
PLACE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CARROLLTON GROWTH OCTOBER
4889 080.74946 877 INSTALL 100 FEET OF 4 INCH POLY ALONG EAST MAIN STREET.
COMMERCIAL OR
INDUSTRIAL EASTLAND GROWTH JUNE
4890 080.74949 14,573
INSTALL 4,380 FEET OF 2 INCH POLY ALONG STREETS OF SUMMIT PARKS
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DESOTO GROWTH OCTOBER
4891 080.74950 11,548
INSTALL 55 POLY SERVICE LINES AND ABANDON 55 STEEL SERVICE LINES IN
BRYAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALDWELL SYSTEM INTEGRITY OCTOBER
4892 080.74954 5,390
INSTALL 290 FEET OF 4 INCH POLY ALONG THE STREET OF DISTRIBUTION DRIVE.
DEVELOPER INSTALLED FACILIITES.
COMMERCIAL OR
INDUSTRIAL WILMER GROWTH JUNE
4893 080.74955 145,296
INSTALL 3,640 FEET OF 2 INCH POLY ALONG STREETS OF MAPLEWOOD PHASE 2
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GLENN HEIGHTS GROWTH SEPTEMBER
4894 080.74956 (11,552)
RELOCATE FACILITIES. INSTALL 250 FEET OF 6 INCH STEEL AND ABANDON 250
FEET OF 6 INCH STEEL ALONG INTERSECTION OF TEXAS AVE AND FM 2818 TO
ACCOMODATE NEW BUILDING. ALL CUSTOMERS COLLEGE STATION
RELOCATION OF
FACILITIES SEPTEMBER
4895 080.74958 212,629
INSTALL 100 FEET OF 8 INCH STEEL ALONG WILLIAMS DRIVE IN GEORGETOWN
AND ABANDON 100 FEET OF 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY DECEMBER
4896 080.74960 275,924
INSTALL 1,200 FEET OF 8 INCH, 1,800 FEET OF 4 INCH, AND 700 FEET OF 2 INCH
POLY ALONG THE STREETS OF HARVEST SUBDIVISION IN NORTHLAKE. RESIDENTIAL NORTHLAKE GROWTH DECEMBER
4897 080.74961 167,525
INSTALL 2,600 FEET OF 2 INCH POLY ALONG THE STREETS OF HARVEST
SUBDIVSION IN NORTHLAKE. RESIDENTIAL NORTHLAKE GROWTH DECEMBER
4898 080.74962 2,957 INSTALL 175 FEET OF 4 INCH POLY ALONG MARSHAL DRIVE.
COMMERCIAL OR
INDUSTRIAL GRAND PRAIRIE GROWTH MARCH
4899 080.74965 1,778
INSTALL 300 FEET OF 2 INCH POLY ALONG BOB HANGAR ROAD. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH APRIL
4900 080.74966 674,439
INSTALL 3,375 FEET OF 6 INCH, 540 FEET OF 4 INCH AND 9.780 FEET OF 2 INCH
POLY ALONG STREETS OF DOVE HOLLOW PHASE 1 SUBDIVISION. RESIDENTIAL WAXAHACHIE GROWTH SEPTEMBER
4901 080.74968 20,479
INSTALL 1,500 FEET OF 4 INCH POLY ALONG 14TH STREET AND HAWKINS RUN IN
MIDLOTHIAN. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL MIDLOTHIAN GROWTH DECEMBER
4902 080.74969 60,543
INSTALL 3,000 FEET OF 2 INCH POLY ALONG THE STREETS OF SOUTHERN POINTE
SUBDIVISION IN COLLEGE STATION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH SEPTEMBER
4903 080.74970 69,185
INSTALL 2,075 FEET OF 2 INCH POLY ALONG FM 2818. DEVELOPER INSTALLED
FACILITIES.
COMMERCIAL OR
INDUSTRIAL BRYAN GROWTH OCTOBER
4904 080.74979 (5,710)
RELOCATE FACILITIES. INSTALL 150 FEET OF 6 INCH POLY ALONG WESTPORT
PARKWAY AND ABANDON 150 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY
OF FORT WORTH. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES MAY
4905 080.74980 97,166
INSTALL 450 FEET OF 6 INCH POLY ALONG CHERRY AND ABANDON 450 FEET OF 4
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY APRIL
4906 080.74981 595,329
INSTALL 3,740 FEET OF 2 INCH POLY AND ABANDON 3,295 FEET OF 3 INCH AND 55
FEET OF 6 INCH STEEL NEAR THE INTERSECTION OF CHANNEL AND BROCKBANK
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4907 080.74982 119,527
INSTALL 2,635 FEET OF 2 INCH POLY ALONG TRAIL CREEK SUBDIVISION IN
JOSHUA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CLEBURNE GROWTH DECEMBER
4908 080.74983 535,165
INSTALL 1,500 FEET OF 2 INCH POLY AND ABANDON 1,500 FEET OF 2 INCH STEEL
ALONG THE STREETS OF DALLAS IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4909 080.74984 331,843
INSTALL 2,670 FEET OF 2 INCH POLY AND ABANDON 2,240 FEET OF 2 INCH, 165
FEET OF 4 INCH, AND 10 FEET OF 8 INCH STEEL AND 165 FEET OF 4 INCH POLY
ALONG WEBBS CHAPPLE IN ACCORDANCE WITH THE RAILROAD COMMISSON OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4910 080.74985 130,053
INSTALL DISTRICT REGULATOR STATION #01 ALVORD STREET AND EAST CURTIS
STREET IN QUANAH AND ABANDON DISTRICT REGULATOR STATION #01 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY SEPTEMBER
4911 080.74986 24,408
RELOCATE FACILITIES. INSTALL 550 FEET OF 4 INCH POLY AND ABANDON 550 FT
OF 3 IN STEEL TO ACCOMODATE CITY OF DALLAS STREETS PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
4912 080.74988 118,863 RELOCATE FACILITIES. INSTALL 22 .75 INCH POLY SERVICE LINES ALONG ALAMO ST ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY DECEMBER
4913 080.74990 3,859
RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH POLY ALONG
MEADOWCREEK AND ABANDON 110 FEET OF 2 INCH POLY TO ACCOMMODATE
CITY OF GARLAND STREET PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES OCTOBER
4914 080.74991 21,780
INSTALL 3,600 FEET OF 4 INCH AND 300 FEET OF 2 INCH POLY ALONG VALLEY
RIDGE ROAD IN LEWISVILLE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL LEWISVILLE GROWTH JULY
4915 080.74993 791,289
INSTALL 3,990 FEET OF 2 INCH POLY ALONG BELKNOLL AND SEYMOUR IN DALLAS
AND ABANDON 90 FEET OF 2 INCH POLY AND 3,675 FEET OF 3 INCH AND 230 FEET
OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4916 080.74996 483,299
INSTALL 2,400 FEET OF 2 INCH POLY AND ABANDON 278 FEET OF 2 INCH, 589 FEET
OF 3 INCH STEEL AND 161 FEET OF 2 INCH, 1,355 FEET OF 4 INCH POLY ALONG
SUNSET, ANNA AND BOLIVAR STREET IN ACCORDANCE TO THE TEXAS RAILROAD
COMMISSION RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER
4917 080.75001 7 INSTALL 89 FEET OF 4 INCH POLY ALONG SOUTH MAIN. RESIDENTIAL JOSHUA GROWTH MARCH
4918 080.75012 642
INSTALL 4 INCH SERVICE LINE ALONG THE STREETS OF WALMART IN
SWEETWATER.
COMMERCIAL OR
INDUSTRIAL SWEETWATER GROWTH JULY
4919 080.75015 415,366
INSTALL 3,635 FEET OF 4 INCH AND 5,945 FEET OF 2 INCH POLY ALONG STREETS
OF THE OAKS AT NORTHGROVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WAXAHACHIE GROWTH SEPTEMBER
4920 080.75017 12,916
INSTALL 1,000 FEET OF 2 INCH POLY ALONG THE STREETS OF STONEBRIER.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH JUNE
4921 080.75018 47,131
INSTALL 2,060 FEET OF 2 INCH POLY ALONG THE STREETS OF SOUTHERN POINTE
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH JULY
4922 080.75021 1,608 INSTALL 600 FEET OF 4 INCH POLY ALONG PLANO PARKWAY IN PLANO.
COMMERCIAL OR
INDUSTRIAL PLANO GROWTH SEPTEMBER
4923 080.75023 31,675 INSTALL 100 FEET OF 4 INCH POLY ALONG SOUTH MULBERRY STREET.
COMMERCIAL OR
INDUSTRIAL ENNIS GROWTH SEPTEMBER
4924 080.75025 349,343
INSTALL 2,750 FEET OF 2 INCH POLY AND ABANDON 2,700 FEET OF 2 INCH STEEL
ALONG RADSTOCK STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
4925 080.75029 927
RELOCATE FACILITIES. INSTALL 990 FEET OF 2 INCH POLY ALONG GLENDORA AND
ABANDON 990 FEET OF 2 INCH STEEL TO ACCOMODATE CITY OF DALLAS IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
4926 080.75032 465,097
INSTALL 2,600 FEET OF 4 INCH ALONG WRIGLEY WAY IN FORT WORTH AND
ABANDON 2,500 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
4927 080.75033 (34) INSTALL DOCKING EQUIPMENT FOR KENWORTH AND F550 IN GROESBECK. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT MARCH
4928 080.75041 1,638
INSTALL 465 FEET OF 4 INCH POLY AND ABANDON 425 FEET OF 4 INCH STEEL
ALONG STREETS OF CLEBURNE. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY DECEMBER
4929 080.75043 103,751
INSTALL 4272 FEET OF 2 INCH POLY ALONG THE STREETS OF HONEY CREEK
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH JUNE
MTX Additions
Page 145 of 178
364
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4930 080.75045 34,517
INSTALL 600 FEET OF 2 INCH POLY ALONG JEFFERSON. DEVELOPER INSTALLED
FACILITIES. ALL CUSTOMERS GRAND PRAIRIE GROWTH OCTOBER
4931 080.75047 11,923
INSTALL 1000 FEET OF 2 INCH AND 1200 FEET OF 4 INCH POLY ALONG PLANTERS
ROAD. DEVELOPER INSTALLED FACILTIES.
COMMERCIAL OR
INDUSTRIAL SUNNYVALE GROWTH JUNE
4932 080.75048 483,110 INSTALL 1,293 FEET OF 4 INCH, 500 FEET OF 6 INCH POLY ALONG DENVER AVE AND ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
4933 080.75049 480
INSTALL 1100 FEET OF 6 INCH POLY ALONG THE STREETS OF ABILENE.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL ABILENE GROWTH SEPTEMBER
4934 080.75052 21,019
INSTALL 620 FEET OF 2 INCH AND 1,680 FEET OF 4 INCH POLY ALONG THE
STREETS OF ABES LANDING SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GRANBURY GROWTH JULY
4935 080.75053 58,495
INSTALL 1400 FEET OF 10 INCH STEEL AND ABANDON 1400 FEET OF 10 INCH
STEEL ALONG TERMINAL C OF DALLAS FORT WORTH AIRPORT IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER
4936 080.75054 1,688
INSTALL 700 FEET OF 4 INCH POLY ALONG CYPRESS AND ABANDON 700 FEET OF
4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY OCTOBER
4937 080.75058 1,089,138 INSTALL 3,120 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY ALONG RUSTOWN AND ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4938 080.75059 566,260
INSTALL 2,400 FEET OF 2 INCH POLY AND ABANDON 2,390 FEET OF 3 INCH STEEL
ALONG THE STREETS OF RUSTOWN IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4939 080.75060 17,940
INSTALL 575 FEET OF 4 INCH POLY ALONG THE STREET OF WAINWRIGHT WAY.
DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS CARROLLTON GROWTH DECEMBER
4940 080.75064 (3,382) INSTALL 100 FEET OF 2 INCH POLY ALONG WEST PARNELL STREET. RESIDENTIAL DENISON GROWTH APRIL
4941 080.75066 807
RELOCATE FACILITIES. INSTALL 131 FEET OF 2 INCH POLY ALONG
WESTBOROUGH LANE AND ABANDON 125 FEET OF 2 INCH POLY TO ACCOMODATE
DEVELOPER FACILITIES. ALL CUSTOMERS LEANDER
RELOCATION OF
FACILITIES JUNE
4942 080.75068 399,925
INSTALL 1,650 FEET OF 2 INCH POLY ALONG WHITMAN AVENUE IN FORT WORTH
AND ABANDON 1,600 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
4943 080.75069 340,802
INSTALL 2,025 FEET OF 2 INCH, 315 FEET OF 4 INCH POLY ALONG NORTH LUMPKIN
STREET WITHIN THE CITY OF MART AND ABANDON 10 FEET OF 4 INCH, 15 FEET OF
3 INCH POLY AND 950 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS MART SYSTEM INTEGRITY JUNE
4944 080.75071 327,659
INSTALL 360 FEET OF 4 INCH, 1,750 FEET OF 2 INCH POLY AND ABANDON 1,370
FEET OF 3 INCH STEEL AND 420 FEET OF 4 INCH POLY ALONG MCLLENAN AVENUE
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY DECEMBER
4945 080.75072 1,054,586
INSTALL 2,495 FEET OF 2 INCH AND 700 FEET OF 4 INCH POLY NEAR THE
INTERSECTION OF GROSS AND PIPER AND ABANDON 820 FEET OF 6 INCH AND
3,000 FEET OF 3 INCH STEEL AND 30 FEET OF 2 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4946 080.75073 341,078
INSTALL 2,127 FEET OF 4 INCH POLY AND ABANDON 2,138 FEET OF 3 INCH, 20
FEET OF 4 INCH POLY ALONG TEXAS AVENUE AND NORTH COUNTY LINE ROAD IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY DECEMBER
4947 080.75074 726,749 INSTALL 20 FEET OF 2 INCH AND 3,310 FEET OF 4 INCH POLY NEAR THE INTERSECTI ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4948 080.75076 16,086 INSTALL 250 FEET OF 2 INCH POLY ALONG EDEN TAP ROAD. RESIDENTIAL KENNEDALE GROWTH DECEMBER
4949 080.75077 122,437
INSTALL DISTRICT REGULATOR STATION #22 AND 165 FEET OF 4 INCH STEEL
ALONG 4TH STREET AND FORREST AVENUE AND ABANDON DISTRICT REGULATOR
STATION #22 AND 160 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER
4950 080.75078 636,411
INSTALL 10 FEET OF 4 INCH AND 620 FEET OF 6 INCH POLY ALONG GOODWIN AND
ABANDON 600 FEET OF 10 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4951 080.75082 659
RELOCATE FACILITIES. INSTALL 280 FEET OF 4 INCH POLY AND ABANDON 250
FEET OF 4 INCH STEEL ALONG SOUTH 9TH STREET TO ACCOMODATE CITY OF
FORT WORTH STORM SEWER PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES OCTOBER
4952 080.75083 672,436
RELOCATE FACILITIES. INSTALL 3,600 FEET OF 2 INCH, 450 FEET OF 4 INCH POLY
AND ABANDON 3,600 FEET OF 2 INCH AND 450 FEET OF 4 INCH POLY ALONG
ELMCREST AND LARRAINE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY DECEMBER
4953 080.75084 2,378,662
INSTALL 4 MILES OF 6 INCH STEEL FROM P(2ND)/L26 JUNCTION TO LOTT DISTRICT
REGULATOR STATION SOUTH OF HWY 320 AND ABANDON 4 MILES OF 6 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LOTT SYSTEM INTEGRITY DECEMBER
4954 080.75089 51,988
INSTALL 4,221 FEET OF 2 INCH POLY ALONG THE STREETS OF WILLIAMS CREEK
RESERVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH SEPTEMBER
4955 080.75090 3,036
RELOCATE FACILITIES. INSTALL 42 FEET OF 6 INCH POLY AND ABANDON 30 FEET
OF 6 INCH POLY ALONG HIGHWOOD TRAIL TO ACCOMODATE CITY OF FORT
WORTH STORM SEWER PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES OCTOBER
4956 080.75091 323,903
INSTALL 2,000 FEET OF 4 INCH, 450 FEET OF 2 INCH POLY ALONG WEST
HOPKINGS STREET AND ABANDON 2,550 FEET OF 2 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY DECEMBER
4957 080.75094 26
INSTALL 28 FEET OF 2 INCH POLY AND ABANDON 28 FEET OF 2 INCH POLY ALONG
HIGHWAY 224. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY JUNE
4958 080.75097 3,850
RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH AND 115 FEET OF 2 INCH POLY
AND ABANDON 50 FEET OF 6 INCH AND 115 FEET OF 2 INCH POLY ALONG TITTLE
DRIVE TO ACCOMODATE CITY OF LEWISVILLE IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE
RELOCATION OF
FACILITIES OCTOBER
4959 080.75098 12,410
RELOCATE FACILITIES. INSTALL 120 FEET OF 4 INCH POLY AND ABANDON 120
FEET OF 4 INCH POLY ALONG KARNES STREET TO ACCOMODATE CITY OF
FLOWERMOUND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FLOWER MOUND
RELOCATION OF
FACILITIES OCTOBER
4960 080.75102 45,684 INSTALL 400 FEET OF 2 INCH POLY ALONG RIDGEVIEW ROAD. RESIDENTIAL SHERMAN GROWTH APRIL
4961 080.75108 9,725 INSTALL 80 FEET OF 2 INCH POLY ALONG THE STREET OF NORTH SHORE DRIVE.
COMMERCIAL OR
INDUSTRIAL BRYAN GROWTH JUNE
4962 080.75110 3,958
INSTALL 600 FEET OF 2 INCH POLY ALONG THE STREETS OF MEANDERING WAY
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FAIRVIEW GROWTH APRIL
4963 080.75112 10,413
INSTALL 275 FEET OF 2 INCH POLY AND ABANDON 358 FEET OF 10 INCH STEEL
ALONG 10TH STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
4964 080.75115 111,654
INSTALL 75 FEET OF 4 INCH POLY ALONG HORNE STREET, 450 FEET OF 2 INCH
POLY ALONG CARVER DRIVE AND ABANDON 450 FEET OF 3 INCH STEEL AND 30
FEET OF 4 INCH POLY DUE TO CITY CONFLICT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE
4965 080.75124 264,425 RELOCATE FACILITIES. INSTALL 1,180 FEET OF 2 INCH POLY ALONG CHERRY STREE ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY DECEMBER
4966 080.75129 7,454
INSTALL 980 FEET OF 2 INCH POLY ALONG THE STREET OF TALBERT DRIVE.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL PLANO GROWTH SEPTEMBER
4967 080.75130 32,720
INSTALL 600 FEET OF 2 INCH POLY ALONG THE STREETS OF BANDIT TRAIL
SUBDIVISION. RESIDENTIAL KELLER GROWTH SEPTEMBER
4968 080.75132 1,744
RELOCATE FACILITIES. INSTALL 300 FEET OF 6 INCH POLY ALONG MAIN STREET
AND ABANDON 300 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF
CROWLEY STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY
RELOCATION OF
FACILITIES OCTOBER
4969 080.75133 455,851 INSTALL 1,121 FEET OF 2 INCH, 930 FEET OF 4 INCH POLY AND ABANDON 280 FEET O ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY DECEMBER
4970 080.75146 756,942
INSTALL 3,520 FEET OF 2 INCH POLY ALONG HEALEY DRIVE ALLEY AND ABANDON
1,950 FEET OF 3 INCH, 1,560 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
4971 080.75147 918,671
INSTALL 2,960 FEET OF 2 INCH POLY AND ABANDON 2,860 FEET OF 3 INCH STEEL,
100 FEET OF 4 INCH POLY ALONG HILLGLENN ROAD IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4972 080.75149 3,532
RELOCATE FACILITIES. INSTALL 600 FEET OF 6 INCH POLY ALONG SH 121 AND
ABANDON 600 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF LEWISVILLE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE
RELOCATION OF
FACILITIES OCTOBER
MTX Additions
Page 146 of 178
365
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
4973 080.75152 63,612
INSTALL 350 FEET OF 2 INCH POLY ALONG KNOLL TRAIL IN DALLAS AND ABANDON
700 FEET OF 2 INCH POLY. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4974 080.75158 13,541
INSTALL 1,160 FEET OF 4 INCH AND 130 FEET OF 8 INCH STEEL CASING ALONG
THE STREET OF FM 731. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL BURLESON GROWTH SEPTEMBER
4975 080.75159 748,236
INSTALL 3,630 FEET OF 2 INCH POLY ALONG MILMAR DRIVE ALLEY AND ABANDON
3,530 FEET OF 3 INCH STEEL AND 100 FEET OF 4 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
4976 080.75160 317,742
INSTALL 1,350 FEET OF 2 INCH POLY ALONG MARLIN DRIVE ALLEY AND ABANDON
1,350 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JUNE
4977 080.75161 1,090,686
INSTALL 4,260 FEET OF 2 INCH POLY AND ABANDON 3,050 FEET OF 6 INCH, 1,210
FEET OF 3 INCH STEEL ALONG CRET RIDGE DRIVE IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
4978 080.75162 266,058
INSTALL 200 FEET OF 4 INCH POLY AND ABANDON 130 FEET OF 4 INCH POLY
ALONG THE STREETS OF DALLAS IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JULY
4979 080.75164 181,509
INSTALL 1,320 FEET OF 4 INCH, 916 FEET OF 2 INCH POLY ALONG THE STREETS
OF OMEGA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER
4980 080.75165 215,398
INSTALL 2282 FEET OF 4 INCH AND 787 FEET OF 2 INCH POLY ALONG THE
STREETS OF OMEGA RANCH SUBDIVISION. RESIDENTIAL GEORGETOWN GROWTH JUNE
4981 080.75170 28,682 INSTALL DISTRICT REGULATOR STATION #301 AND 5 FEET OF 2 INCH, 5 FEET OF 4 IN ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE
4982 080.75171 97,086 INSTALL DISTRICT REGULATOR STATION #307 , 5 FEET OF 2INCH POLY, 5 FEET OF 4 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JULY
4983 080.75174 85,651
INSTALL DISTRICT REGULATOR STATION #403, 5 FEET OF 2 INCH, 5 FEET OF 4
INCH POLY ALONG PUTNAM STREET AND ABANDON DISTRICT REGULATOR
STATION #403, 5 FEET OF 4 INCH, 5 FEET OF 6 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE
4984 080.75175 5,743
INSTALL DISTRICT REGULATOR STATION #405 AND ABANDON DISTRICT
REGULATOR STATION #405 AT THE INTERSECTION OF CAMILLIA AND PARKDALE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY APRIL
4985 080.75184 308,755
INSTALL 1,575 FEET OF 2 INCH AND 375 FEET OF 4 INCH POLY ALONG WACO WAY
IN FORT WORTH AND ABANDON 1,950 FEET OF 2 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
4986 080.75186 20,390
INSTALL 235 FEET OF 2 INCH POLY ALONG WOLF RANCH PARKWAY IN
GEORGETOWN, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL GEORGETOWN GROWTH DECEMBER
4987 080.75188 284,743
INSTALL 2,500 FEET OF 2 INCH POLY AND ABANDON 2,450 FEET OF 2 INCH STEEL
ALONG MARTIN LUTHER KING SOUTH. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER
4988 080.75190 231,552
INSTALL 1,100 FEET OF 2 INCH POLY AND ABANDON 850 FEET OF 4 INCH STEEL
AND 25 FEET OF 4 INCH POLY ALONG THE ALLEY EAST OF BROOK TP SPEEDWAY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
4989 080.75195 13,081 INSTALL DISTRICT REGULATOR STATION #138, 28 FEET OF 2 INCH, 30 FEET OF 4 INC ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
4990 080.75196 63,073 INSTALL DISTRICT REGULATOR STATION #139 AND 45 FEET OF 2 INCH, 40 FEET OF 4 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
4991 080.75198 147,319 INSTALL DISTRICT REGULATOR STATION #140 AND 30 FEET OF 2 INCH, 20 FEET OF 4 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
4992 080.75199 110,817 INSTALL DISTRICT REGULATOR STATION #144 AND 20 FEET OF 2 INCH, 30 FEET OF 4 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
4993 080.75200 95,476
INSTALL DISTRICT REGULATOR STATION #02 IN THE ALLEY BETWEEN AVENUE A
AND AVENUE B IN ROSEBUD AND ABANDON DISTRICT REGULATOR STATION #02 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSEBUD SYSTEM INTEGRITY SEPTEMBER
4994 080.75202 56,635
ABANDON DISTRICT REGULATOR STATION #03 ALONG EAST MAIN STREET IN
ROSEBUD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ROSEBUD SYSTEM INTEGRITY SEPTEMBER
4995 080.75203 63,154 INSTALL DISTRICT REGULATOR STATION #01, 40 FEET OF 4 INCH POLY AT THE INTER ALL CUSTOMERS KEENE SYSTEM INTEGRITY SEPTEMBER
4996 080.75204 118,367
INSTALL 2,225 FEET OF 2 INCH, 600 FEET OF 4 INCH POLY ALONG THE STREETS
OF HIGHBRIDGE BOULEVARD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH SEPTEMBER
4997 080.75208 2,930
INSTALL 1510 FEET OF 4 INCH POLY AND 1440 FEET OF 2 INCH POLY ALONG THE
STREETS OF RIDGEVIEW FARMS DEVELOPMENT. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL FORT WORTH GROWTH APRIL
4998 080.75210 62,643 INSTALL DISTRICT REGULATOR STATION #05 AND 20 FEET OF 2 INCH AND 20 FEET O ALL CUSTOMERS KEENE SYSTEM INTEGRITY SEPTEMBER
4999 080.75211 73,092 INSTALL DISTRICT REGULATOR STATION #502 AND 5 FEET OF 2 INCH AND 5 FEET OF ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5000 080.75213 343,980
INSTALL 3,200 FEET OF 4 INCH POLY ALONG THE STREETS OF MERCER CROSSING
DEVELOPMENT IN DALLAS.
COMMERCIAL OR
INDUSTRIAL DALLAS GROWTH DECEMBER
5001 080.75214 116,827 INSTALL DISTRICT REGULATOR STATION #504 AND 5 FEET OF 2 INCH AND 5 FEET OF ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE
5002 080.75215 79,798 INSTALL DISTRICT REGULATOR STATION #505 AND 5 FEET OF 2 INCH AND 5 FEET OF ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE
5003 080.75216 63,189 INSTALL DISTRICT REGULATOR STATION #06 AND 40 FEET OF 4 INCH STEEL AT THE ALL CUSTOMERS KEENE SYSTEM INTEGRITY DECEMBER
5004 080.75217 29,997
INSTALL 4 COUPON TEST STATION ON LINE P2 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PFLUGERVILLE SYSTEM INTEGRITY MARCH
5005 080.75219 418,509
INSTALL 1,350 FEET OF 2 INCH POLY ALONG THE STREETS OF BRIDWELL AT 23RD
STREET AND ABANDON 1,484 FEET OF 2 INCH STEEL AND 129 FEET OF 2 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
5006 080.75221 62,130 INSTALL DISTRICT REGULATOR STATION #01 AND 20 FEET OF 2 INCH, 20 FEET OF 4 ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY SEPTEMBER
5007 080.75222 74,113
INSTALL 4,510 FEET OF 2 INCH POLY ALONG THE STREETS OF SABLE CREEK
SUBDIVISION. DEVELOPER INSTALLED FACILTIES. RESIDENTIAL SANGER GROWTH JUNE
5008 080.75225 100,609
INSTALL 2,930 FEET OF 2 INCH AND 3,150 FEET OF 4 INCH POLY ALONG THE
STREETS OF ELM CREEK SUBDIVISION IN ABILENE. DEVELOPER INSTALLED
FACILIITES. RESIDENTIAL ABILENE GROWTH DECEMBER
5009 080.75227 79,612 INSTALL DISTRICT REGULATOR STATION #314 AND 20 FEET OF 2 INCH, 60 FEET OF 4 ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY SEPTEMBER
5010 080.75228 1,026,703 RELOCATE FACILITIES. INSTALL 1,650 FEET OF 12 INCH AND 140 FEET OF 12 INCH A ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5011 080.75229 222,447
INSTALL 1,325 FEET OF 6 INCH POLY ALONG BAYWATER DRIVE. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL PLANO GROWTH SEPTEMBER
5012 080.75233 290,967
INSTALL 3,803 FEET OF 2 INCH AND 2,858 FEET OF 4 INCH POLY ALONG THE
STREETS OF MAYFAIR SOUTH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CROWLEY GROWTH DECEMBER
5013 080.75236 128,180 INSTALL DISTRICT REGULATOR STATION #01, 40 FEET OF 2 INCH, 40 FEET OF 4 INCH ALL CUSTOMERS ITALY SYSTEM INTEGRITY OCTOBER
5014 080.75239 101,747 INSTALL DISTRICT REGULATOR STATION #509 AND 20 FEET OF 4 INCH, 20 FEET OF 2 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
5015 080.75243 119,376 INSTALL DISTRICT REGULATOR STATION #521 AND 20 FEET OF 2 INCH, 20 FEET OF 6 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5016 080.75248 17,656 INSTALL 100 FEET OF 2 INCH POLY ALONG FM 3060. RESIDENTIAL MIDWAY GROWTH JULY
5017 080.75251 70,915 INSTALL DISTRICT REGULATOR STATION #02 AND 40 FEET OF 2 INCH, 40 FEET OF 4 ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY JUNE
5018 080.75254 42,742
INSTALL 760 FEET OF 2 INCH POLY ALONG THE STREETS OF ENCLAVE
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SAN ANGELO GROWTH SEPTEMBER
5019 080.75256 104,005 INSTALL DISTRICT REGULATOR STATION #05 AND 40 FEET OF 2 INCH, 40 FEET OF 4 ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY JUNE
5020 080.75259 1,012,705 INSTALL 1,965 FEET OF 4 INCH, 2,300 FEET OF 2 INCH POLY NEAR THE INTERSECTIO ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5021 080.75260 80,041
INSTALL 150 FEET OF 2 INCH POLY AND ABANDON 150 FEET OF 2 INCH STEEL
ALONG MCCURDY STREET AND ABANDON 150 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY SYSTEM INTEGRITY SEPTEMBER
5022 080.75261 1,146,696 INSTALL 640 FEET OF 4 INCH, 3,695 FEET OF 2 INCH POLY NEAR THE INTERSECTION ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5023 080.75262 113,015
INSTALL 3,347 FEET OF 6 INCH AND 3,174 FEET OF 2 INCH POLY ALONG THE
STREETS OF SUN CITY NH 77. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER
5024 080.75263 204,040
RELOCATE FACILITIES. INSTALL 755 FEET OF 2 INCH POLY AND ABANDONING 755
FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
5025 080.75270 2,547
INSTALL 30 FEET OF 12 INCH POLY AND ABANDON 30 FEET OF 12 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
5026 080.75273 4,176
INTEGRITY DIGS AND REMEDIATION ALONG LINE CA (2ND) IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
5027 080.75274 11,802
INSTALL 1,100 FEET OF 2 INCH POLY ALONG EXCHANGE CIRCLE. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL COPPELL GROWTH JUNE
5028 080.75276 794,474 INSTALL 640 FEET OF 4 INCH AND 2,795 FEET OF 2 INCH POLY ALONG THE ALLEY NO ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5029 080.75278 449,503
INSTALL 2,417 FEET OF 2 INCH POLY ALONG ROBINSON AVENUE AND LAMAR
STREET AND 321 FEET OF 4 INCH POLY ALONG MYRTA STREET IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY SEPTEMBER
5030 080.75279 350,208
INSTALL 2,768 FEET OF 2 INCH POLY ALONG WASHINGTON STREET AND MYRTA
STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY JULY
MTX Additions
Page 147 of 178
366
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5031 080.75280 559,934
INSTALL 320 FEET OF 4 INCH AND 2,300 FEET OF 2 INCH POLY NEAR THE
INTERSECTION OF SAN VINCENT AND MATTERHORN IN DALLAS AND ABANDON
1,625 FEET OF 4 INCH, 995 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5032 080.75281 391,577 INSTALL 1,283 FEET OF 4 INCH POLY ALONG EARL GARRETT STREET AND HILLCRES ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY SEPTEMBER
5033 080.75286 10,997
INSTALL 525 FEET OF 4 INCH POLY ALONG THE STREETS OF TRADITIONS
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH SEPTEMBER
5034 080.75289 22,680 INSTALL 100 FEET OF 2 INCH POLY ALONG SODA RIDGE ROAD. RESIDENTIAL SOUTHLAKE GROWTH OCTOBER
5035 080.75293 132,044 INSTALL 1,140 FEET OF 2 INCH POLY ALONG KEMROCK AND BLUNTER STREET. RESIDENTIAL DALLAS GROWTH JUNE
5036 080.75299 715,915
INSTALL 10,490 FEET OF 2 INCH, 1,141 FEET OF 4 INCH, AND 2,177 FEET OF 8 INCH
POLY ALONG THE STREETS OF CAMBRIDGE CROSSING SUBDIVISION IN CELINA.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH DECEMBER
5037 080.75301 339,208 INSTALL 80 FEET OF 2 INCH, 1,580 FEET OF 4 INCH POLY ALONG MCLENNAN AVENU ALL CUSTOMERS MART SYSTEM INTEGRITY DECEMBER
5038 080.75303 252
INSTALL 250 FEET OF 2 INCH POLY ALONG FOREST LANE. DEVELOPER INSTALLED
FACILITIES.
COMMERCIAL OR
INDUSTRIAL GARLAND GROWTH JUNE
5039 080.75313 61,440
INSTALL 1,100 FEET OF 4 INCH POLY AND ABANDON 1,100 FEET OF 2 INCH POLY
ALONG OLD DENTON ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS CARROLLTON
SYSTEM
IMPROVEMENT DECEMBER
5040 080.75314 474,849
INSTALL 3,200 FEET OF 4 INCH POLY ALONG WEDGEMONT CIRCLE NORTH IN
FORT WORTH AND ABANDON 600 FEET OF 4 INCH POLY AND 2,600 FEET OF 4 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5041 080.75315 106,861 REPLACE DISTRICT REGULATOR STATION #11 AND 40 FEET OF 2 INCH AND 40 FEET ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY JUNE
5042 080.75317 31,212
INSTALL 250 FEET OF 4 INCH, 920 FEET OF 2 INCH POLY ALONG THE STREETS OF
BENTWOOD SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SAN ANGELO GROWTH SEPTEMBER
5043 080.75318 29,977
INSTALL 1,880 FEET OF 2 INCH POLY ALONG THE STREETS OF BENTWOOD
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SAN ANGELO GROWTH SEPTEMBER
5044 080.75319 301
INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 200 FEET OF 2 INCH POLY
ALONG STREETS OF DALLAS COUNTY. ALL CUSTOMERS ADDISON SYSTEM INTEGRITY DECEMBER
5045 080.75321 98,543 INSTALL DISTRICT REGULATOR STATION #01, 40 FEET OF 2 INCH, 40 FEET OF 4 INCH ALL CUSTOMERS MAYPEARL SYSTEM INTEGRITY DECEMBER
5046 080.75327 (22,688)
INSTALL 8 INCH MAIN LINE VALVE ASSEMBLY AFTER S20 AND S20-1 IN
LANCASTER AND ABANDON 2 INCH DISTRICT REGULATOR STATION AT S20 TO O1-
1. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY SEPTEMBER
5047 080.75328 283,010
INSTALL 475 FEET OF 6 INCH POLY ALONG CRAIK STREET AND ABANDON 6 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY SEPTEMBER
5048 080.75330 15,662
INSTALL 260 FEET OF 2 INCH POLY ALONG CARROLL STREET. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER
5049 080.75334 (42) INSTALL 100 FEET OF 2 INCH POLY ALONG FERGUSON AVENUE. RESIDENTIAL ROCKDALE GROWTH JUNE
5050 080.75335 495,248
INSTALL 2,470 FEET OF 6 INCH, 6,115 FEET OF 4 INCH AND 4,015 FEET OF 2 INCH
POLY ALONG THE STREETS OF BEL-AIRE VILLAGE SUBDIVISION IN SHERMAN.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SHERMAN GROWTH DECEMBER
5051 080.75336 1,382 INSTALL 150 FEET OF 2 INCH POLY ALONG HILL STREET. ALL CUSTOMERS GRAND PRAIRIE GROWTH APRIL
5052 080.75341 140,044
INSTALL 720 FEET OF 2 INCH POLY ALONG RUSH STREET AND ABANDON 720 FEET
OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY JULY
5053 080.75342 223,068 INSTALL 2,030 FEET OF 2 INCH POLY ALONG HADLEY AND BRYAN STREET AND ABAN ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY SEPTEMBER
5054 080.75343 140,354
INSTALL 630 FEET OF 4 INCH POLY ALONG FERNDALE DRIVE AND ABANDON 630
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY SEPTEMBER
5055 080.75351 3,361
INSTALL 495 FEET OF 2 INCH POLY ALONG CHIPALTA DRIVE IN LEANDER,
WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL LEANDER GROWTH DECEMBER
5056 080.75354 224,452
INSTALL 1,400 FEET OF 4 INCH POLY ALONG BRYANT STREET AND ABANDON 1,400
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY OCTOBER
5057 080.75356 504,480
INSTALL 2,700 FEET OF 4 INCH POLY ALONG LLANO AVENUE AND ABANDON 2,700
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY SEPTEMBER
5058 080.75359 140,415
INSTALL 1,480 FEET OF 4 INCH POLY ALONG THE STREETS OF THE VILLAGES ON
MAIN SUBDIVISION IN FRISCO. ALL CUSTOMERS FRISCO GROWTH OCTOBER
5059 080.75367 89,620
INSTALL DISTRICT REGULATOR STATION #15 ALONG THE STREETS OF CISCO AND
ABANDON DISTRICT REGULATOR STATION #15 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY OCTOBER
5060 080.75368 454,675 INSTALL 202 FEET OF 2 INCH, 1,285 FEET OF 4 INCH, 926 FEET OF 6 INCH POLY ALON ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY DECEMBER
5061 080.75369 450,615
INSTALL 552 FEET OF 6 INCH, 2,278 FEET OF 4 INCH, AND 4,303 FEET OF 2 INCH
POLY ALONG THE STREETS OF OMEGA RANCH SUBDIVISION. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER
5062 080.75370 31,961 INSTALL 160 FEET OF 2 INCH POLY ALONG EAST 10TH STREET. RESIDENTIAL FERRIS GROWTH JUNE
5063 080.75378 15,177
INSTALL 1,073 FEET OF 4 INCH POLY ALONG VISTA WAY. DEVELOPER INSTALLED
FACILITIES.
COMMERCIAL OR
INDUSTRIAL BENBROOK GROWTH JULY
5064 080.75379 261,941
INSTALL 1,300 FEET OF 4 INCH, 950 FEET OF 2 INCH POLY ALONG NORTH
KOLLMAN ROAD AND ABANDON 2,150 FEET OF 2 INCH STEEL AND 100 FEET OF 2
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER
5065 080.75380 125,835
INSTALL DISTRICT REGULATOR STATION #05 ALONG WEST DOYLE IN GRANBURY
AND ABANDON DISTRICT REGULATOR STATION #05 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY DECEMBER
5066 080.75381 254,104 INSTALL DISTRICT REGULATOR STATIONS #06 & #08 AND 60 FEET OF 2 INCH, 90 FEE ALL CUSTOMERS HAMILTON SYSTEM INTEGRITY DECEMBER
5067 080.75383 104,260 INSTALL DISTRICT REGULATOR STATION #03 ALONG WEST FREY STREET IN STEPHE ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY SEPTEMBER
5068 080.75384 (14,122)
RELOCATE FACILITIES. INSTALL 240 FEET OF 2 INCH POLY ALONG STACY ROAD
AND ABANDON 230 FEET OF 2 INCH POLY. ALL CUSTOMERS FAIRVIEW
RELOCATION OF
FACILITIES JULY
5069 080.75392 101,745
INSTALL 32 RECTIFIER RING MAIN UNITS (RMUS) DUE TO 3G SUNSET IN ROUND
ROCK. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY OCTOBER
5070 080.75393 1,581 INSTALL 50 FEET OF 4 INCH POLY ALONG STREET IN GRAPEVINE.
COMMERCIAL OR
INDUSTRIAL GRAPEVINE GROWTH SEPTEMBER
5071 080.75396 67,335
INSTALL 1,800 FEET OF 4 INCH AND 235 FEET OF 2 INCH POLY ALONG THE
STREETS OF THE PRESERVE SUBDIVISION IN SHERMAN. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL SHERMAN GROWTH OCTOBER
5072 080.75398 398,040
INSTALL 150 FEET OF 6 INCH AND 1,300 FEET OF 2 INCH POLY ALONG THE
STREETS OF BRITTANY LANE AND ABANDON 150 FEET OF 6 INCH AND 1,258 FEET
OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5073 080.75399 362,013
INSTALL TWO (2) DISTRICT REGULATOR STATIONS, 20 FEET OF 2 INCH, 40 FEET OF
4 INCH POLY. ABANDON DISTRICT REGULATOR STATIONS FARMERSVILLE DRS06
ALONG BOIS D' ARC AVE AND HILL STREET AND FARMERSVILLE DRS07 AT
COLLEGE STREET AND N. RIKE STREET AND 7 FEET OF 2 INCH, 10 FEET OF 6 INCH
POLY AND 47 FEET OF 4 INCH, 2 FEET OF 6 INCH STEEL IN FARMERSVILLE, COLLIN
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY DECEMBER
5074 080.75400 678,750
INSTALL 1,700 FEET OF 6 INCH AND 1,200 FEET OF 2 INCH POLY ALONG THE
STREETS OF DAVIS DRIVE AND ST. MARIA COURT IN ARLINGTON AND ABANDON
1,665 FEET OF 6 INCH AND 1,176 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5075 080.75402 295,892
INSTALL 2,400 FEET OF 2 INCH POLY ALONG THE STREET OF ACADEMY DRIVE IN
ARLINGTON AND ABANDON 55 FEET OF 4 INCH, 1,191 FEET OF 2 INCH AND 1,138
FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5076 080.75404 389,130
INSTALL 3,350 FEET OF 4 INCH POLY ALONG SUMMIT AVENUE IN ARLINGTON AND
ABANDON 3,165 FEET OF 4 INCH STEEL AND 140 FEET OF 4 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5077 080.75408 297,652
INSTALL 2,900 FEET OF 2 INCH POLY AND ABANDON 2,192 FEET OF 2 INCH AND 319
FEET OF 2 INCH STEEL ALONG SHADY LANE AND W. 4TH ARLINGTON, TARRANT
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
MTX Additions
Page 148 of 178
367
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5078 080.75409 322,029
INSTALL 2,500 FEET OF 2 INCH POLY AND ABANDON 1,671 FEET OF 2 INCH STEEL
AND 677 FEET OF 2 INCH POLY ALONG VARSITY CIRCLE IN ARLINGTON, TARRANT
COUNTY, IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5079 080.75411 479,939
INSTALL 1,710 FEET OF 2 INCH ALONG 9TH AND BEVERLY STREET AND ABANDON
2,332 FEET OF STEEL AND 653 FEET OF POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
5080 080.75413 213,683 INSTALL 1,745 FEET OF 2 INCH POLY ALONG HAYES AND SEYMOUR ROAD IN WICHIT ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
5081 080.75421 100,686
RELOCATE FACILITIES. INSTALL 161 FEET OF 6 INCH POLY AND ABANDON 100
FEET OF 6 INCH POLY ALONG THE STREETS OF NORTHLAKE IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTHLAKE SYSTEM INTEGRITY SEPTEMBER
5082 080.75425 259,073
INSTALL 1,850 FEET OF 4 INCH, 5,700 FEET OF 2 INCH POLY ALONG THE STREETS
OF AMBERGROVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH JUNE
5083 080.75428 6,854 RELOCATE FACILITIES. INSTALL 2,530 FEET OF 4 INCH AND 500 FEET OF 2 INCH POL ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JULY
5084 080.75430 110,596
INSTALL 3,750 FEET OF 2 INCH POLY ALONG LONGHORN LANE. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH SEPTEMBER
5085 080.75440 28,299
INSTALL 450 FEET OF 4 INCH POLY ALONG NORTH 12TH AND MULBERRY AND
ABANDON 100 FEET OF 4 INCH CAST IRON AND 350 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
5086 080.75442 (7) INSTALL POLY SERVICE AND ABANDON POLY I SERVICE LINE. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY MARCH
5087 080.75445 177,989
INSTALL 1,985 FEET OF 4 INCH, 1,920 FEET OF 2 INCH POLY ALONG THE STREETS
OF BLUEBONNET ESTATES SUBDIVISION IN ENNIS, ELLIS COUNTY. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL ENNIS GROWTH DECEMBER
5088 080.75446 8,472
INSTALL DISTRICT REGULATOR STATION #05 NEAR INTERSECTION OF WEST MAIN
STREET AND NORTH COWAN STREET IN DECATUR AND ABANDON DISTRICT
REGULATOR STATION #05 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY DECEMBER
5089 080.75447 9,156
INSTALL MONITOR REGULATOR IN DISTRICT REGULATOR STATION #06 ALONG
WOOD STREET IN GRAPEVINE AND AND ABANDON MONITOR REGULATOR IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER
5090 080.75454 77,083
INSTALL 240 FEET OF 4 INCH POLY ALONG THE STREETS OF SANGER AND
ABANDON 210 FEET OF 4 INCH STEEL AND 45 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER SYSTEM INTEGRITY APRIL
5091 080.75459 709,022 RELOCATE FACILITIES. INSTALL 2,500 FEET OF 4 INCH, 70 FEET OF 2 INCH POLY ALO ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY DECEMBER
5092 080.75461 (57,515)
RELOCATE FACILITIES. INSTALL 180 FEET OF 4 INCH POLY AND ABANDON 253
FEET OF 2 INCH STEEL ALONG 6TH STREET TO ACCOMMODATE NEW HOTEL. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES AUGUST
5093 080.75464 69,562
INSTALL DISTRICT REGULATOR STATION #19 AND 70 FEET OF 4 INCH POLY ALONG
BUFFALO STREET AND ABANDON DISTRICT REGULATOR STATION #19 AND 70 FEET
OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY OCTOBER
5094 080.75465 70,828
INSTALL DISTRICT REGULATOR STATION #20 AND 85 FEET OF 6 INCH ALONG THE
INTERSECTION OF CLAUDE AND MAIN STREET AND ABANDON DISTRICT
REGULATOR STATION #20 AND 85 FEET OF 6 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY DECEMBER
5095 080.75466 282,921
INSTALL DISTRCT REGULATOR STATION DRS01 ALONG S. BUTLER DRIVE AND W.
MAIN STREET AND DRS02 ALONG N. BONHAM DRIVE AND W. COATS DRIVE, 22
FEET OF 2 INCH AND 22 FEET OF 4 INCH POLY AND ABANDON DISTRICT
REGULATOR STATION DRS01 AND DRS02 AND 6 FEET OF 2INCH, 9 FEET OF 3 INCH
POLY AND 6 FEET OF 4 INCH STEEL IN ALLEN, COLLIN COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN SYSTEM INTEGRITY DECEMBER
5096 080.75473 158,399
INSTALL 235 FEET OF 4 INCH POLY AND ABANDON 200 FEET OF 4 INCH POLY
ALONG EAST ELDORADO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER
5097 080.75483 175,283
INSTALL 2,154 WIRELESS METER READING ENDPOINTS ON RESIDENTIAL METER
READER IN ROUNDROCK SERVICE AREA. ALL CUSTOMERS UNINCORPORATED
SYSTEM
IMPROVEMENT DECEMBER
5098 080.75485 114,878
INSTALL DISTRICT REGULATOR STATION #08 AND 40 FEET OF 2 INCH, 40 FEET OF
4 INCH ALONG WEST AVENUE C AND ABANDON DISTRICT REGULATOR STATION
#08 AND 40 FEET OF 3 INCH, 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY JUNE
5099 080.75486 182,026
INSALL 1,163 FEET OF 2 INCH, 688 FEET OF 4 INCH POLY AND ABANDON 1,740
FEET OF 2 INCH STEEL, 23 FEET OF 2 INCH POLY ALONG MOBERLY STREET IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5100 080.75488 320,229
INSTALL 1,400 FEET OF 4 INCH, 1,400 FEET OF 2 INCH POLY ALONG NORTH
KOLLMAN ROAD AND ABANDON 1,950 FEET OF 2 INCH STEEL AND 850 FEET OF 2
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER
5101 080.75489 129,553 INSTALL DISTRICT REGULATOR STATION #03 AND 40 FEET OF 2 INCH, 40 FEET OF 4 ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY JUNE
5102 080.75490 221,657
INSTALL 1,260 FEET OF 4 INCH, 15 FEET OF 3 INCH, 125 FEET OF 2 INCH POLY
ALONG 24TH STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY JUNE
5103 080.75493 86,374 INSTALL DISTRICT REGULATOR STATION #09 AND 40 FEET OF 2 INCH, 40 FEET OF 4 ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY JULY
5104 080.75499 3,064
INSTALL 1,315 FEET OF 2 INCH POLY ALONG THE STREETS OF MARINE CREEK
RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JUNE
5105 080.75504 14,969 INSTALL 150 FEET OF 6 INCH POLY ALONG ROY ORR BOULEVARD ALL CUSTOMERS GRAND PRAIRIE GROWTH APRIL
5106 080.75505 27,262 INSTALL 105 FEET OF 4 INCH POLY ALONG THE STREET OF STAR MEADOW DRIVE. ALL CUSTOMERS PROSPER GROWTH DECEMBER
5107 080.75506 58,473
INSTALL 1,450 FEET OF 4 INCH POLY ALONG JOHN CARPLENTER FREEWAY
(SH114) ALL CUSTOMERS GRAND PRAIRIE GROWTH SEPTEMBER
5108 080.75507 1,293,422
INSTALL 3,425 FEET OF 2 INCH AND 1,220 FEET OF 4 INCH POLY NEAR THE
INTERSECTION OF LEATH AND HAMMERLY IN DALLAS AND ABANDON 825 FEET OF
3 INCH POLY AND 3,820 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAIL ROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5109 080.75508 32,289
INSTALL 750 FEET OF 6 INCH POLY ALONG I-35 WEST IN BURLESON. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL BURLESON GROWTH DECEMBER
5110 080.75509 28,398 INSTALL 100 FEET OF 2 INCH POLY ALONG VERBENA STREET. RESIDENTIAL FORT WORTH GROWTH JUNE
5111 080.75515 4,867 INSTALL A NEW ROUTER AT PILOT POINT SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT APRIL
5112 080.75517 2,291 INSTALL 450 FEET OF 2 INCH ALONG OAKBEND DRIVE AND CEIELO AZURE LANE.
COMMERCIAL OR
INDUSTRIAL LEWISVILLE GROWTH DECEMBER
5113 080.75520 61,079
INSTALL 250 FEET OF 2 INCH POLY ALONG 2ND STREET AND ABANDON 300 FEET
OF 4 INCH, 750 FEET OF 3 INCH STEEL, 15 FEET OF 4 INCH BARE STEEL, 490 FEET
OF 3 INCH, 350 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELESTE SYSTEM INTEGRITY DECEMBER
5114 080.75521 4,782 INSTALL 2 1/2 FOOTAGE PIERCING U262 IN WACO DISTRICT. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT JANUARY
5115 080.75525 46,035
INSTALL 3,335 FEET OF 6 INCH POLY ALONG THE STREETS OF CAMBRIDGE BROOK
SUBDIVISION IN DENTON, DENTON COUNTY. ALL CUSTOMERS DENTON GROWTH DECEMBER
5116 080.75529 360,252
INSTALL 5,170 FEET OF 2 INCH AND 3,340 FEET OF 4 INCH POLY AONG THE
STREETS OF WALTON RIDGE SUBDIVISION IN CORINTH. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL CORINTH GROWTH DECEMBER
5117 080.75541 177,542
INSTALL 900 FEET OF 4 INCH, 350 FEET OF 2 INCH POLY AND ABANDON 30 FEET
OF 6 INCH, 880 FEET OF 4 INCH, 550 FEET OF 2 INCH STEEL ALONG JOHNSON
STREET. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY SEPTEMBER
5118 080.75547 532,016
INSTALL 100 FEET OF 2 INCH, 2,550 FEET OF 4 INCH POLY ALONG WEDGEMONT
CIRCLE SOUTH IN FORT WORTH AND ABANDON 2,600 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5119 080.75551 445,701
INSTALL 4,385 FEET OF 4 INCH, 3,810 FEET OF 2 INCH POLY ALONG THE STREET
OF NORTH STAR SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER
5120 080.75552 31,872
INSTALL 585 FEET OF 6 INCH, 1,430 FEET OF 4 INCH POLY ALONG I-35 WEST.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH JUNE
MTX Additions
Page 149 of 178
368
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5121 080.75556 59,219
INSTALL DISTRICT REGULATOR STATION #29 AT THE INTERSECTION OF PHILLIPS
AND MADDISON AND ABANDON DISTRICT REGULATOR STATION #29 IN
ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER
5122 080.75557 3,644
INSTALL 430 FEET OF 2 INCH POLY ALONG WILHITES ESTATES AT NEWTON
COURT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL VALLEY VIEW GROWTH JUNE
5123 080.75558 142,221
INSTALL DISTRICT REGULATOR STATION #31 AT THE INTERSECTION OF BORDER
AND BRYAN IN CLEBURNE AND ABANDON DISTRICT REGULATOR STATION #31 IN
ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER
5124 080.75559 28,085 INSTALL 450 FEET OF 2 INCH POLY ALONG STREETS OF GRAND PRAIRIE. ALL CUSTOMERS GRAND PRAIRIE GROWTH OCTOBER
5125 080.75560 688,810
INSTALL 2,190 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY ALONG THE
INTERSECTION OF DEERWOOD AND RACINE AND ABANDON 2,190 FEET OF 3 INCH,
395 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY IN ACCORDANCE WITH
RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5126 080.75561 (19,523)
RELOCATE FACILITIES. INSTALL 615 FEET OF 2 INCH POLY ALONG BUSINESS 287
AND I-44 ACCESS ROAD AND ABANDON 615 FEET OF 2 INCH STEEL TO
ACCOMODATE TXDOT STREET IMPROVEMENT PROJECT. ALL CUSTOMERS WICHITA FALLS
RELOCATION OF
FACILITIES DECEMBER
5127 080.75562 75,356
INSTALL DISTRICT REGULATOR STATION #10 AT INTERSECTION OF WEST WILSON
STREET AND NORTH FIELD STREET IN CLEBURNE AND ABANDON DISTRICT
REGULATOR STATION #10 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER
5128 080.75563 73,615
INSTALL DISTRICT REGULATOR STATION #07 AT THE INTERSECTION OF WEST
WILSON STREET AND NORTH BUFFALO STREET IN CLEBURNE AND ABANDON
DISTRICT REGULATOR STATION #07 IN ACCORDANCE WITH RAIL ROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER
5129 080.75565 37,466
INSTALL DISTRICT REGULATOR STATION #04 AT THE INTERSECTION OF EAST
HENDERSON AND NORTH LEWIS AND ABANDON DISTRICT REGULATOR STATION
#04 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER
5130 080.75567 747,770
REPLACE 191 SERVICE LINES IN DUNCANVILLE IN ACCORDANCE WITH RAILROAD
COMMISSION RULE 8.209. ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY SEPTEMBER
5131 080.75571 178,350
ABANDON 1,335 FEET OF 3 INCH AND 300 FEET OF 2 INCH POLY ALONG FM 1777 IN
JOSEPHINE. ALL CUSTOMERS JOSEPHINE SYSTEM INTEGRITY DECEMBER
5132 080.75574 298,003
INSTALL 60 FEET OF 12 INCH POLY ALONG BANK STREET AND ABANDON 60 FEET
OF 12 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
5133 080.75575 409,410 INSTALL 68 FEET IN 2 INCH, 984 FEET OF 4 INCH, 1,007 FEET OF 6 INCH POLY AND AB ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY DECEMBER
5134 080.75578 661,517 INSTALL 2,160 FEET OF 4 INCH AND 470 FEET OF 2 INCH POLY NEAR THE INTERSECT ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5135 080.75579 77,408 INSTALL 950 FEET OF 2 INCH POLY ALONG THE STREETS OF TRINITY FALLS. RESIDENTIAL MCKINNEY GROWTH DECEMBER
5136 080.75580 566,123
INSTALL 1,050 FEET OF 6 INCH, 6,315 FEET OF 4 INCH, 5,385 FEET OF 2 INCH POLY
ALONG THE STREETS OF CHAPEL CREEK SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER
5137 080.75581 3,099
ISNTALL 970 FEET OF 4 INCH POLY ALONG NORTH INDUSTRIAL BOULEVARD AND
FM 157. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL EULESS GROWTH JUNE
5138 080.75582 75 INSTALL SECURITY GATE OPERATOR FOR WICHITA FALLS. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JANUARY
5139 080.75584 143,923
INSTALL 1,950 FEET OF 2 INCH POLY FOR THE BROWNWOOD REGIONAL AIRPORT
AND ABANDON 75 FEET OF 2 INCH POLY AND 2,002 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNINCORPORATED SYSTEM INTEGRITY JUNE
5140 080.75585 7,016
INSTALL 2,770 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER
5141 080.75587 135,030
INSTALL 471 FEET OF 4 INCH POLY ALONG DELAWARE SPRING BOULEVARD AND
ABANDON 64 FEET OF 4 INCH POLY AND MAIN LINE REGULATOR #03. ALL CUSTOMERS BURNET
RELOCATION OF
FACILITIES SEPTEMBER
5142 080.75588 23,533
INSTALL 3,490 FEET OF 2 INCH POLY ALONG THE STREETS OF BAR W RANCH
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH NOVEMBER
5143 080.75589 213,591
INSTALL 5,330 FEET OF 2 INCH, 1,410 FEET OF 4 INCH POLY ALONG THE STREETS
OF VERNADAH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH DECEMBER
5144 080.75598 734,457 INSTALL 1,529 FEET OF 6 INCH, 659 FEET OF 2 INCH, 539 FEET OF 4 INCH POLY ALON ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5145 080.75600 49,720
INSTALL 1,729 FEET OF 6 INCH, 2,518 FEET OF 4 INCH AND 4,108 FEET OF 2 INCH
POLY ALONG THE STREETS OF BAR W RANCH SUBDIVISION. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH NOVEMBER
5146 080.75601 28,520
INSTALL RELIEF VALVE IN MORAN AND ABANDON RELIEF VALVE AT MEASURING
STATION 6567.2 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS MORAN SYSTEM INTEGRITY JUNE
5147 080.75604 70,723
INSTALL 1,223 FEET OF 2 INCH POLY ALONG HOGAN'S ALLEY DRIVE IN ARLINGTON,
TARRANT COUNTY. RESIDENTIAL ARLINGTON GROWTH DECEMBER
5148 080.75605 696,725
REPLACE 234 SERVICE LINES ALONG THE STREETS OF LAMPASAS IN
ACCORDANCE WITH RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS LAMPASAS SYSTEM INTEGRITY SEPTEMBER
5149 080.75606 132,042
INSTALL 740 FEET OF 2 INCH POLY ALONG SHELTON STREET AND ABANDON 626
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
5150 080.75608 612,492
INSTALL 3,600 FEET OF 2 INCH POLY ALONG COLLEGE STREET IN SULPHUR
SPRINGS AND ABANDON 3,650 FEET OF 4 INCH STEEL AND 995 FEET 4 INCH, 230
FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY SEPTEMBER
5151 080.75615 48,944
INSTALL 3,080 FEET OF 2 INCH AND 2,135 FEET OF 4 INCH POLY ALONG THE
STREETS OF STARK FARMS IN DENTON. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH DECEMBER
5152 080.75618 864,148 INSTALL 1,540 FEET OF 2 INCH, 2,490 FEET OF 4 INCH AND 235 FEET OF 6 INCH POLY ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5153 080.75620 52,220 INSTALL 290 FEET OF 4 INCH POLY ALONG NORTHWEST HIGHWAY.
COMMERCIAL OR
INDUSTRIAL GRAPEVINE GROWTH OCTOBER
5154 080.75624 448,481
INSTALL 2,900 FEET OF 2 INCH POLY AND ABANDON 2,800 FEET OF 2 INCH POLY
ALONG WALES COURT IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5155 080.75625 457,988
INSTALL 840 FEET OF 4 INCH, 1,895 FEET OF 2 INCH POLY NEAR THE
INTERSECTION OF SAN VICENTE AND SHILOH IN DALLAS AND ABANDON 810 FEET
OF 8 INCH, 30 FEET OF 4 INCH AND 1,895 FEET OF 3 INCH STEEL IN ACCORDANCE
WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5156 080.75628 216,522
INSATLL 1,645 FEET OF 4 INCH POLY AND ABANDON 1,665 FEET OF 2 INCH STEEL
ALONG FLAMINGO ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
5157 080.75629 146,551
INSTALL 2,015 FEET OF 4 INCH, 625 FEET OF 2 INCH POLY ALONG THE STREETS
OF COPPER CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER
5158 080.75630 1,759
PURCHASE TEST GAUGES AND CERTIFICATIONS TO BE USED BY COMPLIANCE
GROUP IN SOUTHEAST REGION DALLAS. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT MARCH
5159 080.75635 128,663
INSTALL 3,045 FEET OF 2 INCH POLY ALONG THE STREETS OF COPPER CREEK
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER
5160 080.75640 19,783 INSTALL 100 FEET OF 2 INCH POLY ALONG JENNY GEORGE LANE.
COMMERCIAL OR
INDUSTRIAL SWEETWATER GROWTH JUNE
5161 080.75642 445,495
INSTALL 2,090 FEET OF 4 INCH POLY ALONG LAGONDA AVENUE IN FORT WORTH
AND ABANDON 2,089 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5162 080.75644 5,826 INSTALL 220 FEET OF 2 INCH POLY ALONG SUNSET DRIVE. RESIDENTIAL MARBLE FALLS GROWTH JUNE
5163 080.75646 253,462
INSTALL 4,250 FEET OF 2 INCH AND 3,300 FEET OF 4 INCH POLY ALONG THE
STREETS OF TERRACINA ESTATES. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH JULY
5164 080.75647 1,468,425
INSTALL 430 FEET OF 8 INCH AND 2,200 FEET OF 12 INCH POLY ALONG WALNUT
HILL AND MIDWAY IN DALLAS AND ABANDON 70 FEET OF 8 INCH POLY AND 475
FEET OF 8 INCH, 2,200 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAIL ROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
5165 080.75648 1,031,398 INSTALL 3,185 FEET OF 2 INCH AND 1,360 FEET OF 4 INCH POLY ALONG THE INTERS ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
5166 080.75649 70,779
INSTALL 130 FEET OF 4 INCH AND 372 FEET OF 2 INCH POLY ALONG NORTH
NEATHERY AND ELM STREETS AND ABANDON 120 FEET OF 3 INCH AND 370 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROADF COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS COLLINSVILLE SYSTEM INTEGRITY APRIL
MTX Additions
Page 150 of 178
369
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5167 080.75650 784,339
INSTALL 4,215 FEET OF 4 INCH POLY ALONG ODESSA AND LEATH AND ABANDON
480 FEET OF 6 INCH,
3,465 FEET OF 3 INCH AND 10 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5168 080.75651 1,237,178 INSTALL 3,370 FEET OF 2 INCH AND 300 FEET OF 4 INCH POLY NEAR THE INTERSECT ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5169 080.75653 1,312,913 INSTALL 1,280 FEET OF 4 INCH POLY ALONG TEXAS STREET AND INSTALL 2,750 FEE ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY DECEMBER
5170 080.75654 15,540 INSTALL 100 FEET OF 2 INCH POLY ALONG THE STREETS OF RICHLAND HILLS. RESIDENTIAL RICHLAND HILLS GROWTH DECEMBER
5171 080.75656 504,676
INSTALL 2,054 FEET OF 4 INCH POLY ALONG FLAMINGO ROAD FROM BROOKLINE
AVENUE TO OAK HILL STREET IN FORT WORTH AND ABANDON 2,012 FEET OF 2
INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
5172 080.75657 80,346
INSTALL 360 FEET OF 6 INCH POLY AND ABANDON 435 FEET OF 6 INCH STEEL
ALONG TRAIL LAKE DRIVE. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE
5173 080.75658 573,380
INSTALL 1,850 FEET OF 6 INCH POLY ALONG HAINES STREET AND ABANDON 1,850
FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
5174 080.75660 31,952
RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 200
FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY SEPTEMBER
5175 080.75666 480,081
INSTALL 1,900 FEET OF 8 INCH AND 15,130 FEET OF 2 INCH POLY ALONG THE
STREETS OF WILDCAT RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH OCTOBER
5176 080.75672 54,004 INSTALL 370 FEET OF 2 INCH POLY ALONG THE STREETS IN STAMFORD. RESIDENTIAL STAMFORD GROWTH DECEMBER
5177 080.75676 8,083 INSTALL 100 FEET OF 2 INCH POLY ALONG VINEYARD DRIVE. RESIDENTIAL GRANBURY GROWTH JULY
5178 080.75682 30,873
DART METER REPLACEMENT IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY JUNE
5179 080.75690 419,197
INSTALL 8,162 FEET OF 2 INCH AND 2,250 FEET OF 4 INCH POLY ALONG THE
STREETS OF CELINA HILLS SUBDIVISION. RESIDENTIAL CELINA GROWTH DECEMBER
5180 080.75694 180,780
INSTALL 1,400 FEET OF 4 INCH AND 1,600 FEET OF 2 INCH POLY ALONG THE
STREETS OF HERITAGE PARK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ABILENE GROWTH DECEMBER
5181 080.75698 708,820 INSTALL 2,620 FEET OF 4 INCH AND 160 FEET OF 2 INCH POLY AND ABANDON 515 FE ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5182 080.75702 35,995
RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY ALONG FM 1417 AND
ABANDON 250 FEET OF 4 INCH POLY TO ACCOMODATE TXDOT HWY
IMPROVEMENTS. ALL CUSTOMERS SHERMAN
RELOCATION OF
FACILITIES MARCH
5183 080.75705 444,232
INSTALL 406 FEET OF 2 INCH, 240 FEET OF 4 INCH POLY ALONG SOUTH CHURCH
AND NEW STREET AND ABANDON 2,667 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY SEPTEMBER
5184 080.75706 93,926
INSTALL 348 FEET OF 4 INCH POLY ALONG MADDOX AVENUE AND ABANDON 348
FEET OF 4 INCH STEEL. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
5185 080.75709 17,425
INSTALL 70 FEET OF 4 INCH POLY ALONG GEORGE BUSH IN GARLAND, DALLAS
COUNTY.
COMMERCIAL OR
INDUSTRIAL GARLAND GROWTH SEPTEMBER
5186 080.75712 421,357 INSTALL 95 FEET OF 2 INCH, 720 FEET OF 4 INCH, 1,320 FEET OF 6 INCH POLY ALONG ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY SEPTEMBER
5187 080.75713 220,761
REPLACEMENT OF MID-TEX 54 LAPTOPS, 61 DOCKING STATIONS AND 30
MONITORS FOR LINCOLN CENTER II AND PLANO SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT SEPTEMBER
5188 080.75716 170,697 INSTALL DISTRICT REGULATOR STATION #01 AND 80 FEET OF 2 INCH, 40 FEET OF 4 ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY DECEMBER
5189 080.75717 161,019
INSTALL DISTRICT REGULATOR STATION #04 AND 40 FEET OF 4 INCH, 40 FEET OF
2 INCH POLY ALONG WEST REDBUD LANE AND ABANDON DISTRICT REGULATOR
STATION #04 AND 40 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAIL ROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY JUNE
5190 080.75720 107,206
INSTALL 190 FEET OF 2 INCH POLY ALONG WILLIAM STREET AND ABANDON 190
FEET OF 6 INCH STEEL AND 10 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE
RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER
5191 080.75722 142,804
INSTALL 700 FEET OF 4 INCH POLY ALONG KENDOLPH DRIVE AND ABANDON 60
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER
5192 080.75723 318,457
INSTALL 1,808 FEET OF 4 INCH POLY ALONG NELL STREET AND ABANDON 1,820
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
5193 080.75725 59,921 INSTALL PLATFORM AT TURTLE CREEK REGULATOR STATION. ALL CUSTOMERS DALLAS
SYSTEM
IMPROVEMENT JUNE
5194 080.75728 267,007
INSTALL 1,416 FEET OF 4 INCH POLY ALONG EASTOVER STREET AND ABANDON
849 FEET OF 3 INCH POLY AND 580 FEET OF 3 INCH STEEL IN ACCORDANCE WITH
THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
5195 080.75729 468,234 INSTALL 1,120 FEET OF 4 INCH AND 1,800 FEET OF 2 INCH POLY AND DISTRICT REGU ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY DECEMBER
5196 080.75730 341,250 INSTALL 1,450 FEET OF 2 INCH AND 480 FEET OF 4 INCH POLY ALONG NORTH WARD ALL CUSTOMERS ITALY SYSTEM INTEGRITY SEPTEMBER
5197 080.75731 216,495 INSTALL 1,180 FEET OF 2 INCH POLY ALONG TAYLOR, WHITE, MAIN AND COUCH STR ALL CUSTOMERS ITALY SYSTEM INTEGRITY DECEMBER
5198 080.75736 390,080
INSTALL 1,938 FEET OF 2 INCH POLY ALONG HILLSIDE STREET AND SOUTH
HUGHES STREET AND ABANDON 1,954 FEET OF 3 INCH STEEL IN ACCORDANCE
WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5199 080.75742 76,102
INSTALL 460 FEET OF 4 INCH POLY ALONG CHILDERS AVENUE AND ABANDON 440
FEET OF 4 INCH STEEL AND 50 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE
RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY SEPTEMBER
5200 080.75745 23,449
INSTALL 5,869 FEET OF 2 INCH AND 3,745 FEET OF 4 INCH POLY ALONG THE
STREETS OF BELLA TERRA SUBDIVISION. RESIDENTIAL TEMPLE GROWTH JUNE
5201 080.75746 796,557
INSTALL 2,395 FEET OF 6 INCH, 3,680 FEET OF 4 INCH, AND 3,610 FEET OF 2 INCH
POLY ALONG THE STREETS OF CIBOLO HILLS SUBDIVISION IN FORT WORTH. RESIDENTIAL FORT WORTH GROWTH DECEMBER
5202 080.75747 14,369 INSTALL 60 FEET OF 2 INCH POLY ALONG TITUS STREET AND POPE STREET. RESIDENTIAL MCKINNEY GROWTH SEPTEMBER
5203 080.75748 45,060
INSTALL 1,215 FEET OF 4 INCH POLY ALONG W METRO DRIVE IN LEANDER.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL LEANDER GROWTH DECEMBER
5204 080.75750 89,265 INSTALL DISTRICT REGULATOR STATION #21 AND 30 FEET OF 2 INCH AND 30 FEET O ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY OCTOBER
5205 080.75751 12,922
INSTALL 1,709 FEET OF 6 INCH AND 3,936 FEET OF 2 INCH POLY ALONG THE
STREETS OF ENTRADA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH SEPTEMBER
5206 080.75752 274,419
INSTALL 1,006 FEET OF 2 INCH, 645 FEET OF 4 INCH POLY ALONG TAHOE DRIVE
AND ABANDON 1,629 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAIL
ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
5207 080.75753 596,697 INSTALL 2,900 FEET OF 8 INCH AND 125 FEET OF 2 INCH POLY ALONG DALLAS STRE ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY DECEMBER
5208 080.75754 479,210
INSTALL 2,245 FEET OF 8 INCH, 375 FEET OF 2 INCH AND 200 FEET OF 4 INCH POLY
AND ABANDON 70 FEET OF 4 INCH, 607 FEET OF 3 INCH, 144 FEET OF 2 INCH POLY
AND 1,150 FEET OF 3 INCH, 638 FEET OF 2 INCH STEEL ALONG DALLAS AND
JEFFERSON STREETS IN VAN ALSTYNE, GRAYSON COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY DECEMBER
5209 080.75756 79,991
INSTALL 2,265 FEET OF 2 INCH AND 738 FEET OF 4 INCH POLY ALONG THE
STREETS OF HIGHLAND FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ABILENE GROWTH SEPTEMBER
5210 080.75758 190,150
INSTALL 2,450 FEET OF 2 INCH POLY ALONG MAGNOLIA AND HICKORY AND
ABANDON 2,235 FEET OF 2 INCH STEEL AND 215 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY DECEMBER
5211 080.75759 1,411,727
INSTALL 10,806 WMR END POINTS TO COMMERCIAL METERS IN THE DALLAS
METRO. ALL CUSTOMERS UNINCORPORATED
SYSTEM
IMPROVEMENT JUNE
5212 080.75762 70,572
INSTALL (2) 12 INCH STOPPLES, (1) 8 INCH STOPPLE, (1) 6" STOPPLE AND (1) WELD
SLEEVE TO SHUT DOWN LOCAL GAS SYSTEM DUE TO THIRD-PARTY DAMAGE. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY NOVEMBER
5213 080.75769 233,354
INSTALL 1,285 FEET OF 4 INCH POLY ALONG PECOS STREET FROM EASTOVER
AVENUE TO PARKER HENDERSON IN FORT WORTH AND ABANDON 1,273 FEET OF 3
INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
5214 080.75770 475,605
INSTALL 1,458 OF 2 INCH POLY AND ABANDON 589 FEET OF 2 INCH STEEL AND 24
FEET OF 2 INCH POLY ALONG GLENWOOD LANE IN ACCORDANCE WITH THE RAIL
ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER
5215 080.75772 16,947
INSTALL 45 FEET IN 2 INCH POLY ALONG STREETS OF WACO IN ACCORDANCE
WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. RESIDENTIAL WACO GROWTH SEPTEMBER
5216 080.75773 9,167
INSTALL 1,386 FEET OF 4 INCH AND 4,339 FEET OF 2 INCH POLY ALONG THE
STREETS OF BRYSON SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH SEPTEMBER
MTX Additions
Page 151 of 178
370
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5217 080.75777 219,219
INSTALL 2,325 FEET OF 2 INCH POLY ALONG OAK AND PINE AND ABANDON 2,325
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER
5218 080.75778 9,595
INSTALL 530 FEET OF 4 INCH AND 323 FEET OF 2 INCH POLY ALONG SOUTH 10TH
STREET IN PFLUGERVILLE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL PFLUGERVILLE GROWTH DECEMBER
5219 080.75780 693,398 INSTALL 70 FEET OF 2 INCH, 3.052 FEET OF 6 INCH, 5 FEET OF 4 INCH POLY ALONG I ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY DECEMBER
5220 080.75782 37,514
INSTALL 286 FEET OF 2 INCH POLY AND ABANDON 286 FEET OF 2 INCH POLY
ALONG WELLINGTON IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY JUNE
5221 080.75784 6,183
INSTALL DISTRICT REGULATOR STATION #19 AND ABANDON DISTRICT
REGULATOR STATION #19 ALONG LILLIAN STREET BETWEEN LONG AND MCNEIL
STREET IN STEPHENVILLE IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY MARCH
5222 080.75785 101,606
INSTALL 2,594 FEET OF 2 INCH POLY ALONG THE STREETS OF MANOR COMMONS
SUBDIVISION. RESIDENTIAL MANOR GROWTH DECEMBER
5223 080.75786 463,533
INSTALL 772 FEET OF 4 INCH, 595 FEET OF 2 INCH, 590 FEET OF 6 INCH POLY
ALONG HARRINGTON AVENUE AND HOMAN AVENUE IN FORT WORTH AND
ABANDON 2,114 FEET OF POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5224 080.75787 229,206
INSTALL 1,669 FEET OF 4 INCH AND 3,916 FEET OF 2 INCH POLY ALONG THE
STREETS OF MANOR COMMONS SUBDIVISION. RESIDENTIAL MANOR GROWTH SEPTEMBER
5225 080.75788 462,861
INSTALL 1,450 FEET OF 4 INCH, 404 FEET OF 2 INCH POLY ALONG HOMAN AVENUE
FROM NORTHWEST 15TH STREET TO NORTHWEST 14TH STREET IN FORT WORTH
AND ABANDON 880 FEET OF 3 INCH STEEL AND 934 FEET OF POLY IN
ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
5226 080.75789 6,295 SMART CAL FOR WACO SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT MARCH
5227 080.75790 5,621 2 (2) SENSIT GOLD G2 FOR BRYAN SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT MARCH
5228 080.75791 409,830 RELOCATE FACILITIES. INSTALL 2,938 FEET OF 6 INCH, 145 FEET OF 4 INCH AND 42 ALL CUSTOMERS NORTH RICHLAND HILLS SYSTEM INTEGRITY DECEMBER
5229 080.75796 6,186
INSTALL 604 FEET OF 8 INCH, 1,358 FEET OF 2 INCH POLY ALONG THE STREETS
OF SANTA RITA RANCH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH OCTOBER
5230 080.75797 12,496
RELOCATE FACILITIES. INSTALL 277 FEET OF 6 INCH POLY ALONG COUNTY ROAD
199 AND CROSS CREEK BOULEVARD ALL CUSTOMERS HUTTO
RELOCATION OF
FACILITIES SEPTEMBER
5231 080.75799 467,030
INSTALL 2,100 FEET OF 4 INCH, 1,000 FEET OF 2 INCH POLY ON SH 14 AND
COLLEGE STREET IN MEXIA AND ABANDON 2,745 FEET OF 2 INCH STEEL AND 382
FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER
5232 080.75801 15,289
INSTALL 647 FEET OF 4 INCH AND 3,247 FEET OF 2 INCH POLY ALONG THE
STREETS OF COTTONWOOD CREED SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL HUTTO GROWTH SEPTEMBER
5233 080.75803 5,165
INSTALL 341 FEET OF 2 INCH POLY ALONG NEW MEISTER LANE AND MEISTER
LANE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL PFLUGERVILLE GROWTH DECEMBER
5234 080.75804 26,179 INSTALL A NEW RECITIFIER AND GROUNDBED IN KILGORE "BAMBURG". ALL CUSTOMERS KILGORE SYSTEM INTEGRITY JUNE
5235 080.75805 20,887
INSTALL 806 FEET OF 8 INCH, 1,040 FEET OF 4 INCH, 1,099 FEET OF 2 INCH POLY
ALONG THE STREETS OF SALERNO SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
5236 080.75806 387,459
INTALL 582 FEET OF 4 INCH, 735 FEET OF 6 INCH POLY ALONG THE ALLEY OF
HOMAN AVENUE AND HARRINGTON AVENUE IN FORT WORTH AND ABANDON 640
FEET OF 8 INCH, 584 FEET OF 4 INCH, 94 FEET OF 6 INCH POLY IN ACCORDANCE
WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5237 080.75807 247,910
INSTALL 1,200 FEET OF 2 INCH POLY ALONG MILDRED LANE AND ABANDON 1,200
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY OCTOBER
5238 080.75808 35,823
INSTALL 60 FEET OF 4 INCH POLY ALONG ESTERS AND CONFLANS ROAD AND
ABANDON 60 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY SEPTEMBER
5239 080.75812 14,987
INSTALL 920 FEET OF 6 INCH, 1,130 FEET OF 4 INCH, 120 FEET OF 2 INCH POLY
ALONG THE STREETS OF GREENS PRAIRIE RESERVE SUBDIVISION. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH OCTOBER
5240 080.75813 3,136
INSTALL CALIBRATION STATION FOR 4 GAS MONITORS TO MONITOR
H2S/CO/CH4/OS AT THE HASLET SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT MARCH
5241 080.75814 15,604
INSTALL 50 FEET OF 4 INCH AND 1,150 FEET OF 2 INCH POLY ALONG THE STREETS
OF GREENS PRAIRIE RESERIVE SUBDIVISION. DEVELOP INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER
5242 080.75815 (1,681) INSTALL 70 FEET OF 4 INCH POLY ALONG BONNIE VIEW ROAD. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES JULY
5243 080.75816 10,688
INSTALL 1,680 FEET OF 2 INCH POLY ALONG THE STREETS OF GREENS PRAIRIE
RESERVE SUBDIVISION. DEVELOP INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER
5244 080.75817 6,295 PURCHASE CALIBRATING STATION FOR SENSITS SMART CAL 360 DESKTOP. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT MARCH
5245 080.75818 20,664
INSTALL 925 FEET OF 8 INCH POLY ALONG INTERSTATE 30 AND ABANDON 860
FEET OF 8 INCH POLY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FATE
RELOCATION OF
FACILITIES SEPTEMBER
5246 080.75819 4,807
DEFIBTECH LIFELINE AED INCLUDING PREP AND RESPONSE KIT. 2 (2) FOR
ALTAMESA SERVICE CENTER AND 1 (1) FOR WESTPORT PARKWAY SERVICE
CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT JUNE
5247 080.75821 164,731
INSTALL 770 FEET OF 4 INCH POLY ALONG EAST KELLIS AND ABANDON 445 FEET
OF 3 INCH STEEL AND 318 FEET OF 4 INCH POLY IN ACCORDANCE WTIH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5248 080.75822 23,639
INSTALL 334 FEET OF 2 INCH POLY ALONG EAST CHEDDAR LOOP. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL PFLUGERVILLE GROWTH SEPTEMBER
5249 080.75825 76,108
ABANDON 30 FEET&NBSP; OF 4 INCH, 10 FEET OF 6 INCH STEEL IN CITY OF
STAMFORD DISTRICT REGULATOR STATIONS #04 AND #22 IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY JULY
5250 080.75826 183,457
INSTALL 4,300 FEET OF 2 INCH POLY ALONG THE STREETS OF BAYSIDE WEST
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROWLETT GROWTH DECEMBER
5251 080.75827 80,082
INSTALL 40 FEET OF 2 INCH AND 40 FEET OF 4 INCH POLY AND DISTRICT
REGULATOR STATION #03 ALONG 8TH STREET AND ROBINSON STREET AND
ABANDON 10 FEET OF 2 INCH POLY AND 10 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILES SYSTEM INTEGRITY SEPTEMBER
5252 080.75828 607,021 INSTALL 260 FEET OF 4 INCH POLY, SWEETWATER DISTRICT REGULATOR STATIONS ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY DECEMBER
5253 080.75829 16,674
INSTALL 240 FEET OF 2 INCH POLY ALONG HIGHWAY 78. DEVELOPER INSTALLED
FACILITIES.
COMMERCIAL OR
INDUSTRIAL WYLIE GROWTH SEPTEMBER
5254 080.75830 147,240
INSTALL 80 FEET OF 2 INCH POLY AND LORAINE DISTRICT REGULATOR STATION
DRS02 AND ABANDON LORAINE DISTRICT REGLATOR STATION DRS02 AND 10 FEET
OF 2 INCH AND 10 FEET OF 3 INCH STEEL ALONG THE STREETS OF LORAINE,
MITCHELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS LORAINE SYSTEM INTEGRITY DECEMBER
5255 080.75833 293,321
INSTALL 660 FEET OF 4 INCH, 2,020 FEET OF 2 INCH POLY ALONG SUMPTER AND
ECHOLS IN MEXIA AND ABANDON 660 FEET OF 4 INCH, 561 FEET OF 2 INCH POLY
AND 1,311 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER
5256 080.75842 19,702 INSTALL 950 FEET OF 4 INCH POLY ALONG JOHN DAY ROAD.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH JULY
5257 080.75845 25,674
ABANDON 365 FEET OF 4 INCH, 685 FEET OF 6 INCH, 100 FEET OF 6 INCH STEEL
AND DISTRICT REGULATOR STATION #03 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY JULY
5258 080.75847 35,770
INSTALL 120 FEET OF 4 INCH POLY ALONG HIGHWAY 66 AND ABANDON 100 FEET
OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
5259 080.75852 21,486
INSTALL 3,054 FEET OF 8 INCH AND 826 FEET OF 2 INCH POLY ALONG THE
STREETS OF SADDLEBACK SUBDIVSION IN LIBERTY HILL. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER
5260 080.75854 453,196 INSTALL 2,297 FEET OF 8 INCH AND 250 FEET OF 2 INCH POLY ALONG BOBTOWN RO ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
5261 080.75856 19,383 GATE OPERATORS AND ROLL BAR FOR BAR SECURITY GATES. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JUNE
5262 080.75857 4,875
INSTALL 350 FEET OF 2 INCH POLY ALONG BROADE STREET. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL LEANDER GROWTH SEPTEMBER
MTX Additions
Page 152 of 178
371
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5263 080.75858 75,597
INSTALL 280 FEET OF 8 INCH POLY ALONG VINEYARD ROAD AND ABANDON 280
FEET OF 8 INCH STEEL INSTALL 120 FEET OF 4 INCH POLY ALONG HIGHWAY 66
AND ABANDON 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY JUNE
5264 080.75859 344,290
INSTALL 2,200 FEET OF 4 INCH, 940 FEET OF 2 INCH POLY ALONG SUMPTER AND
DENTON IN MEXIA AND ABANDON 550 FEET OF 4 INCH POLY AND 1,630 FEET OF 2
INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER
5265 080.75860 358,748
INSTALL 533 FEET OF 6 INCH, 416 FEET OF 4 INCH IN THE ALLEY OF HOMAN
AVENUE AND HARRINGTON AVENUE IN FORT WORTH AND ABANDON 701 FEET OF
6 INCH AND 416 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5266 080.75863 275,555 INSTALL 1,400 FEET OF 4 INCH AND 350 FEET OF 2 INCH POLY ALONG PIONEER DRI ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER
5267 080.75864 15,520
INSTALL 170 FEET OF 2 INCH POLY ALONG LAKESHORE ROAD. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL SHADY SHORES GROWTH SEPTEMBER
5268 080.75867 60,171 INSTALL 185 FEET OF 2 INCH POLY ALONG EAST SOUTH STREET AND ABANDON 110 ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY JUNE
5269 080.75870 43,852
INSTALL 290 FEET OF 2 INCH POLY ALONG TRIPP ROAD AND ABANDON 280 FEET
OF 2 INCH STEEL INSTALL 120 FEET OF 4 INCH POLY ALONG HIGHWAY 66 AND
ABANDON 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SUNNYVALE SYSTEM INTEGRITY JULY
5270 080.75875 3,658
INSTALL 136 FEET OF 2 INCH POLY ALONG MOORE STREET. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL LEANDER GROWTH JULY
5271 080.75876 201,686
INSTALL 1,125 FEET OF 4 INCH AND 5,425 FEET OF 2 INCH POLY ALONG THE
STREETS OF HEARTLAND. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH DECEMBER
5272 080.75878 16,407
INSTALL SEVENTEEN (17) LIGHT FIXTURES AT THE WAXAHACHIE SERVICE
CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES APRIL
5273 080.75883 91,960 INSTALL 140 FEET OF POLY AND DISTRICT REGULATOR STATION #01 ALONG MOSS S ALL CUSTOMERS DE LEON SYSTEM INTEGRITY JUNE
5274 080.75887 87,235 INSTALL NEW AIR CONDITIONING UNITS FOR BRYAN SERVICE CENTER ALL CUSTOMERS SYSTEM WIDE STRUCTURES JUNE
5275 080.75890 20,226
PURCHASE NEW OFFICE WIFI AND NETWORKING EQUIPMENT FOR KERRVILLE
SERVICE CENTER IN KERRVILLE, KERR COUNTY. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT DECEMBER
5276 080.75894 60,609
INSTALL 140 FEET OF 8 INCH POLY ALONG MEMORIAL PARKWAY AND ABANDON
130 FEET OF 8 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FATE SYSTEM INTEGRITY SEPTEMBER
5277 080.75900 5,616
INSTALL 1,115 FEET OF 2 INCH POLY ALONG THE STREETS OF HORIZON LAKE
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH SEPTEMBER
5278 080.75901 19,186
INSTALL 2,647 FEET OF 4 INCH ALONG THE STREETS OF NORTHLINE IN LEANDER.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH OCTOBER
5279 080.75907 107,687
INSTALL 400 FEET OF 4 INCH POLY ALONG NORTH RACE STREET AND ABANDON
480 FEET OF 4 INCH, 100 FEET OF 4 INCH STEEL, 158 FEET OF 2 INCH POLY
INSTALL 120 FEET OF 4 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD
COMISSION RULE 8.209 ALL CUSTOMERS EVERMAN SYSTEM INTEGRITY SEPTEMBER
5280 080.75908 34,349 INSTALL 375 FEET OF 2 INCH POLY ALONG SHADY GROVE ROAD. ALL CUSTOMERS IRVING SYSTEM INTEGRITY SEPTEMBER
5281 080.75909 266,224 INSTALL 1,200 FEET OF 4 INCH, 1,000 FEET OF 2 INCH POLY ALONG SUMPTER AND N ALL CUSTOMERS MEXIA SYSTEM INTEGRITY SEPTEMBER
5282 080.75910 5,281
INSTALL 803 FEET OF 4 INCH AND 404 FEET OF 2 INCH POLY ALONG THE STREETS
OF BOOT RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FREDERICKSBURG GROWTH SEPTEMBER
5283 080.75911 130,024
RELOCATE FACILITIES. INSTALL 680 FEET OF 4 INCH POLY ALONG KNOWLES
DRIVE AND ABANDON 300 FEET OF 4 INCH AND 2,195 FEET OF 2 INCH POLY TO
ACCOMODATE THE CITY OF SAGINAW IN ACCORDANCE WITH TEXAS RAILROAD
COMISSION RULE 8.209 ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY SEPTEMBER
5284 080.75915 103,423
INSTALL ERCON MATTING ALONG 6 INCH STEEL ON L29 (2ND) TO REMEDIATE
EXPOSURE. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY SEPTEMBER
5285 080.75917 6,957
INSTALL 403 FEET OF 4 INCH AND 315 FEET OF 2 INCH POLY ALONG THE STREET
OF BOOT RANCH SUBDIVISION. DEVELOPER INSTALL FACILITIES. RESIDENTIAL FREDERICKSBURG GROWTH SEPTEMBER
5286 080.75918 3,905
INSTALL 1,691 FEET OF 4 INCH POLY ALONG THE STREETS OF BOOT RANCH
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FREDERICKSBURG GROWTH DECEMBER
5287 080.75919 954,046
INSTALL 2,246 FEET OF 6 INCH, 145 FEET OF 4 INCH, 1,330 FEET OF 2 INCH POLY
AND ABANDON 920 FEET OF 6 INCH, 190 FEET OF 4 INCH AND 820 FEET OF 2 INCH
STEEL ALONG SANGER AVENUE FROM LAKE AIR DRIVE TO WESTVIEW DRIVE IN
WACO, MCCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
5288 080.75921 19,388
INSTALL 75 FEET OF 2 INCH POLY ALONG OLD DENTON ROAD AND ABANDON 50
FEET OF 2 INCH POLY. ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY SEPTEMBER
5289 080.75922 191,294
INSTALL 435 FEET OF 4 INCH POLY ALONG ELM STREET AND ABANDON 300 FEET
OF 4 INCH, 115 FEET OF 2 INCH AND 40 FEET OF 1.25 INCH STEEL AND 30 FEET OF
3 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209 ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY DECEMBER
5290 080.75924 184,047 INSTALL DISTRICT REGULATOR STATION #01 AND 90 FEET OF 4 INCH AND 90 FEET O ALL CUSTOMERS GLEN ROSE SYSTEM INTEGRITY DECEMBER
5291 080.75925 307,867 INSTALL 200 FEET OF 4 INCH AND 30 FEET OF 2 INCH POLY AND DISTRICT REGULAT ALL CUSTOMERS HAMILTON SYSTEM INTEGRITY SEPTEMBER
5292 080.75932 433,709
INSTALL 1,499 FEET OF 2 INCH POLY ALONG ATLAS DRIVE IN DENTON IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER
5293 080.75933 21,268
INSTALL 2,514 FEET OF 4 INCH AND 1,620 FEET OF 2 INCH POLY ALONG HIGH
PLAINS DRIVE AND PHEASANT DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL NOLANVILLE GROWTH DECEMBER
5294 080.75934 14,854
INSTALL WAREHOUSE HEATERS AT THE SHERMAN SERVICE CENTER AT BLUE
FLAME LANE. ALL CUSTOMERS SYSTEM WIDE STRUCTURES APRIL
5295 080.75937 1,660
INSTALL 660 FEET OF 4 INCH POLY ALONG K AVENUE. DEVELOPER INSTALLED
FACILITIES.
COMMERCIAL OR
INDUSTRIAL PLANO GROWTH SEPTEMBER
5296 080.75943 6,287 PURCHASE A VALVE CHANGE TOOL KIT STANDARD FOR CORSICANA DISTRICT. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT JUNE
5297 080.75947 12,084
INSTALL 1,200 FEET OF 4 INCH, 775 OF 2 INCH POLY ALONG THE STREETS OF
WATERFORD ESTATES SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER
5298 080.75948 2,703
INSTALL 4,300 FEET OF 2 INCH AND 720 FEET OF 4 INCH POLY ALONG THE
STREETS OF GIDEON GROVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH APRIL
5299 080.75950 13,215
INSTALL 800 FEET OF 2 INCH POLY ALONG BEASLEY BOULEVARD (US HIGHWAY
59). DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL WHITEWRIGHT GROWTH DECEMBER
5300 080.75954 11,966
INSTALL 100 FEET OF 4 INCH ALONG BELMEADE DRIVE AND GOLDEN BEAR DRIVE
AND ABANDON 100 FEET OF 4 INCH POLY. ALL CUSTOMERS CARROLLTON
RELOCATION OF
FACILITIES DECEMBER
5301 080.75955 47,078
PURCHASE 11 LAPTOPS, 20 RV55X MODEMS, 11 DOCKING STATIONS AND 1
MONITORS FOR THE NORTH REGION. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT JUNE
5302 080.75958 99,132
INSTALL 100 FEET OF 2 INCH POLY ALONG SKYLINE DRIVE IN THE CITY OF
TROPHY CLUB. RESIDENTIAL TROPHY CLUB GROWTH SEPTEMBER
5303 080.75964 336,581
INSTALL 3,600 FEET OF 4 INCH AND 1,750 FEET OF 2 INCH POLY ALONG THE
STREETS OF KREYMER ESTATES SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL WYLIE GROWTH DECEMBER
5304 080.75965 64,116
INSTALL 3,225 FEET OF 2 INCH POLY ALONG THE STREETS OF WATERS EDGE
SUBDIVISION IN ROBINSON. RESIDENTIAL ROBINSON GROWTH OCTOBER
5305 080.75966 395,292
RELOCATE FACILITIES.
INSTALL 1,755 FEET OF 4 INCH POLY AND ABANDON 1,755 FEET OF 6 INCH STEEL
IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5306 080.75967 258,797
RELOCATE FACILITIES.
INSTALL 1,000 FEET OF 4 INCH AND 800 FEET OF 2 INCH POLY ALONG MILLET
AVENUE AND ABANDON 1,725 FEET OF 4 INCH AND 200 FEET OF 6 INCH POLY IN
ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
5307 080.75968 973,065
INSTALL 3,100 FEET OF 8 INCH, 425 FEET OF 4 INCH, 255 FEET OF 2 INCH POLY AND
ABANDON 3,000 FEET OF 6 INCH, 150 FEET OF 4 INCH POLY ALONG SOUTH CLARK
ROAD IN CEDAR HILL, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO SYSTEM INTEGRITY DECEMBER
5308 080.75972 385,697
INSTALL 711 FEET OF 2 INCH POLY, 220 FEET OF 4 INCH AND 83 FEET OF 2 INCH
STEEL AND ABANDON 418 FEET OF 2 INCH POLY, 85 FEET OF 4 INCH, 165 FEET OF
2 INCH STEEL ALONG FM 730 NEAR INTERSECTION OF EAST ROCK ISLAND IN
BOYD, WISE COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BOYD SYSTEM INTEGRITY DECEMBER
5309 080.75973 167,490
REPLACEMENTS FOR LAPTOP, MIC TRUCK RETROFIT DOCK & POWER SUPPLY
FOR MCKINNEY SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT SEPTEMBER
MTX Additions
Page 153 of 178
372
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5310 080.75975 72,133
INSTALL 580 FEET OF 2 INCH POLY ALONG WOOD STREET IN WINTERS AND
ABANDON 500 FEET OF 6 INCH STEEL AND 110 FEET OF 6 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WINTERS SYSTEM INTEGRITY NOVEMBER
5311 080.75976 124,518
INSTALL 470 FEET OF 6 INCH POLY ALONG NINTH STREET IN BALLINGER AND
ABANCON 470 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY OCTOBER
5312 080.75978 25,709
INSTALL 1,066 FEET OF 2 INCH AND 218 FEET OF 4 INCH POLY ALONG THE
STREETS OF MISSION RANCH SUBDIVISION. DEVELOP INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER
5313 080.75979 74,852 INSTALL A NEW TOWER IN MCKINNEY. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY SEPTEMBER
5314 080.75984 253,299
REPLACE WEST REGION LAPTOP AND TABLET COMPUTERS TO BE USED BY
DIRECTORS/MANAGERS/SUPERVISORS/MIC/CONSTRUCTION AND SERVICE. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT DECEMBER
5315 080.75987 126,332
INSTALL TWO (2) 8 INCH STOPPLES AND FOUR (4) 2 INCH TOR TO REPAIR A LEAK
ON LINE 232 IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY JULY
5316 080.75990 86,256
INSTALL 705 FEET OF 2 INCH POLY ALONG COLGATE AT LOMO ALTO IN DALLAS,
DALLAS COUNTY.
COMMERCIAL OR
INDUSTRIAL DALLAS GROWTH DECEMBER
5317 080.75991 5,674
PURCHASE OF ONE (1) HEATH ODORATOR NATURAL GAS (OD1) FOR EASTLAND
OFFICE ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT MARCH
5318 080.75992 286,632
REPLACE TABLET FOR THE WACO SERVICE CENTER, MODEMS FOR WACO,
TEMPLE, GROESBECK AND KILLEEN SERVICE CENTER AND TRUCK DOCKS AND
SUPPLIES. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT OCTOBER
5319 080.75994 136,190 INSTALL DISTRICT REGULATOR STATION #04, 885 FEET OF 4 INCH, 25 FEET OF 2 INC ALL CUSTOMERS WHITEWRIGHT SYSTEM INTEGRITY DECEMBER
5320 080.75996 68,467
INSTALL 6 TEST STATIONS AT FOREIGN LINE CROSSING IN STEPHENVILLE IN
ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS DE LEON SYSTEM INTEGRITY SEPTEMBER
5321 080.76001 436,562
INSTALL 2,930 FEET OF 6 INCH AND 5,162 FEET OF 2 INCH POLY ALONG THE
STREETS OF TAVOLO PARK SUBDIVISION IN FORT WORTH, TARRANT COUNTY. RESIDENTIAL FORT WORTH GROWTH DECEMBER
5322 080.76004 69,183
INSTALL 120 FEET OF 8 INCH POLY ALONG MOUNT VIEW AVENUE AND ABANDON
120 FEET OF 4 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMISSION
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
5323 080.76005 5,147
PURCHASE ONE (1) ELECTROFUSION PROCESSOR MSA 340 WITH CASE, SCANNER
KIT, WITH BARCODE FROM GEORGE FISCHE CENTRAL PLASTICS TO BE KEPT AT
ALTAMESA SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT MARCH
5324 080.76009 1,727
INSTALL 1,460 FEET OF 4 INCH, 250 FEET OF 2 INCH POLY ALONG RENNER ROAD.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL RICHARDSON GROWTH DECEMBER
5325 080.76012 154,627
INSTALL 1,175 FEET OF 2 INCH AND 215 FEET OF 4 INCH POLY ALONG RYAN
PLACE DRIVE AND ABANDON 1,065 FEET OF OF 3 INCH STEEL, 70 FEET OF 3 INCH
AND 60 FEET OF 4 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
5326 080.76013 581,907
INSTALL 8,480 FEET OF 2 INCH, 3,195 FEET OF 4 INCH AND 2,380 FEET OF 6 INCH
POLY ALONG THE STREETS OF ANNA CROSSING SUBDIVISION IN ANNA, COLLIN
COUNTY. RESIDENTIAL ANNA GROWTH DECEMBER
5327 080.76014 43,774
FY2022 MID-CITIES COMPUTER REPLACEMENT TO INCLUDE 18 DELL LAPTOPS, 10
MONITORS, 55 MODEMS. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT SEPTEMBER
5328 080.76018 68,321
INSTALL 330 FEET OF 6 INCH POLY ALONG FM 2818 AND ABANDON 330 FEET OF 6
INCH POLY TO ACCOMODATE CITY OF COLLEGE STATION STREET PROJECT IN
ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY SEPTEMBER
5329 080.76019 23,765
INSTALL 1,415 FEET OF 2 INCH POLY ALONG LUBBOCK STREET AT BLIZZEL
STREET .
COMMERCIAL OR
INDUSTRIAL COLLEGE STATION GROWTH AUGUST
5330 080.76024 122,222
INSTALL DISTRICT REGULATOR STATION #07 AND 70 FEET OF 2 INCH, 40 FEET OF
4 INCH POLY ALONG NORTH WOOD STREET AND MEADOWBRIDGE STREET IN
FERRIS AND ABANDON DISTRICT REGULATOR STATION #07 IN ACCORDANCE WITH
RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FERRIS SYSTEM INTEGRITY DECEMBER
5331 080.76025 132,942
INSTALL DISTRICT REGULATOR STATION #01 40 FEET OF 2 INCH AND 40 FEET OF 4
INCH POLY ALONG SOUTH CHURCH STREET AND WEST 6TH STREET IN FERRIS
AND ABANDON DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH RAIL
ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FERRIS SYSTEM INTEGRITY OCTOBER
5332 080.76026 101,942
INSTALL 575 FEET OF 4 INCH POLY ALONG THE ALLEY OF WALKER AND BOND
STREET AND ABANDON 188 FEET OF 3 INCH STEEL AND 199 FEET OF 3 INCH POLY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY OCTOBER
5333 080.76027 873,297
INSTALL 1,370 FEET OF 6 INCH AND 1,951 FEET OF 2 INCH POLY AND ABANDON
1,352 FEET OF 8 INCH, 1,742 FEET OF 2 INCH AND 693 FEET OF 1.25 INCH STEEL
ALONG RICHLAND DRIVE AND TENNYSON DRIVE IN WACO, MCCLENNAN COUNTY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
5334 080.76028 171,471
INSTALL 3,550 FEET OF 2 INCH, 1,550 FEET OF 4 INCH POLY ALONG THE STREETS
OF OAK CREEK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH SEPTEMBER
5335 080.76029 1,381
INSTALL 5,460 FEET OF 2 INCH POLY ALONG THE STREETS OF TRAVIS RANCH
MARINA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH DECEMBER
5336 080.76032 24,548
INSTALL 460 FEET OF 4 INCH POLY ALONG ELLISON STREET. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL BURLESON GROWTH SEPTEMBER
5337 080.76033 317
INSTALL 29 FEET OF 4 INCH POLY ALONG MURPHY STREET AND ABANDON 44
FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY APRIL
5338 080.76039 1,016,852
INSTALL 2,750 FEET OF 2 INCH AND 835 FEET OF 4 INCH POLY ALONG MAYBETH IN
DALLAS AND ABANDON 590 FEET OF 6 INCH, 2,755 FEET OF 4 INCH STEEL AND 10
FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5339 080.76044 4,696
INSTALL 1,598 FEET OF 2 INCH POLY ALONG THE STREETS OF BRYSON
SUBDIVISION IN LEANDER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
5340 080.76045 5,854
INSTALL 2,216 FEET OF 2 INCH POLY ALONG THE STREETS OF BRYON
SUBDIVISION IN LEANDER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
5341 080.76047 97,399
INSTALL 340 FEET OF 2 INCH POLY ALONG WESTWOOD IN ABILENE AND ABANDON
130 FEET OF 3 INCH STEEL AND 70 FEET OF 2 INCH POLY IN ACCORDANCE WITH
RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
5342 080.76052 285,550
INSTALL 375 FEET OF 4 INCH POLY ALONG HIGHWAY 84 AT JEWELL DRIVE AND
ABANDON 375 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
5343 080.76055 9,437
INSTALL 50 FEET OF 2 INCH POLY ALONG WILSON AT DUVAL AND ABANDON 45
FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY JUNE
5344 080.76056 194,315
INSTALL 4,025 FEET OF 2 INCH POLY ALONG THE STREETS OF AVALON AT ARGYLE
SUBDIVISION IN ARGYLE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARGYLE GROWTH DECEMBER
5345 080.76064 471,842
INSTALL 1,545 FEET OF 4 INCH AND 13,110 FEET OF 2 INCH POLY ALONG THE
STREETS OF STONEHILL SUBDIVISION IN CEDAR HILL, DALLAS COUNTY.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CEDAR HILL GROWTH DECEMBER
5346 080.76065 32,292
INSTALL 625 FEET OF 4 INCH POLY ALONG WOODWAY DRIVE IN WOODWAY.
DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS WOODWAY GROWTH DECEMBER
5347 080.76066 303,431
INSTALL 3,250 FEET OF 4 INCH, 2,539 FEET OF 2 INCH POLY ALONG THE STREETS
OF SUMMERCREEK SUBDIVISION IN FORT WORTH. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
5348 080.76076 22,924
INSTALL 2,475 FEET OF 4 INCH AND 8,665 FEET OF 2 INCH POLY ALONG THE
STREETS OF HIDDEN LAKES ESTATES SUBDIVISION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL DESOTO GROWTH SEPTEMBER
5349 080.76085 280,239
INSTALL 1,430 FEET OF 2 INCH POLY ALONG HODDE STREET AND ABANDON 1,430
FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER
5350 080.76087 86,232 INSTALL 65 FEET OF 4 INCH, 25 FEET OF 2 INCH POLY AND DISTRICT REGULATOR ST ALL CUSTOMERS BAIRD SYSTEM INTEGRITY SEPTEMBER
5351 080.76088 307,446
INSTALL 370 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #16
ALONG THE STREETS OF ABILENE AND ABANDON 162 FEET OF 4 INCH AND 10
FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION #16 IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
MTX Additions
Page 154 of 178
373
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5352 080.76089 119,634
INSTALL 165 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #28
ALONG THE STREETS OF ABILENE AND ABANDON 20 FEET OF 2 INCH, 180 FEET OF
4 INCH AND DISTRICT REGULATOR STATION #28 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
5353 080.76093 705,367
INSTALL 2,225 FEET OF 2 INCH POLY ALONG RAYNELLE STREET IN DALLAS AND
ABANDON 2,225 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5354 080.76098 1,070,422
INSTALL 1,400 FEET OF 6 INCH, 20 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY
ALONG HALL STREET IN DALLAS AND ABANDON 1,375 FEET OF 8 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5355 080.76101 121,404
INSTALL DISTRICT REGULATOR STATION #05, 290 FEET OF 4 INCH AND 150 FEET
OF 2 INCH POLY ALONG SOUTH MABEL STREET AND 8TH STREET IN FERRIS AND
ABANDON DISTRICT REGULATOR STATON #05 IN ACCORDANCE WITH RAIL ROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FERRIS SYSTEM INTEGRITY OCTOBER
5356 080.76107 405,578
INSTALL DISTRICT REGULATOR STATION #47 ALONG IH35E AND TEASLEY ROAD
AND ABANDON DISTRICT REGULATOR STATION #47. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER
5357 080.76108 34,798
INSTALL 350 FEET OF 2 INCH POLY ALONG SILVER SAGE. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL WICHITA FALLS GROWTH OCTOBER
5358 080.76109 303,859
INSTALL 2,675 FEET OF 4 INCH, 2,215 FEET OF 2 INCH POLY ALONG THE STREETS
OF PIONEER POINT SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER
5359 080.76110 338,587
INSTALL 20 FEET OF 6 INCH, 10 FEET OF 2 INCH STEEL AND ABANDON 20 FEET OF
6 INCH AND 10 FEET OF 2 INCH STEEL AT THE AMAZON WAREHOUSE IN FORT
WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE
5360 080.76111 128,768
INSTALL 950 FEET OF 2 INCH POLY ALONG JOLINE AND AVENUE K AND ABANDON
1,005 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
5361 080.76120 125,759
INSTALL DISTRICT REGULATOR STATION #02 AND 40 FEET OF 4 INCH POLY ALONG
CAMPUS STREET AND EAST 5TH STREET IN FERRIS AND ABANDON DISTRICT
REGULATOR STATION #02 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FERRIS SYSTEM INTEGRITY DECEMBER
5362 080.76121 61,943
INSTALL 400 FEET OF 2 INCH POLY ALONG WEST LANE AND ABANDON 400 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FOREST HILL SYSTEM INTEGRITY SEPTEMBER
5363 080.76122 106,905
INSTALL 676 FEET OF 4 INCH AND 15 FEET OF 2 INCH POLY ALONG BROCKETT
STREET AND ABANDON 601 FEET OF 3 INCH STEEL AND 77 FEET OF 3 INCH POLY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLINSVILLE SYSTEM INTEGRITY SEPTEMBER
5364 080.76124 3,096 INSTALL CONSOLE FOR LAPTOP IN TRUCK FOR GREENVILLE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT JUNE
5365 080.76129 18,850 INSTALL 140 FEET OF 2 INCH POLY ALONG WEST DAY STREET. RESIDENTIAL DENISON GROWTH JUNE
5366 080.76132 353,539
INSTALL 6,445 FEET OF 4 INCH POLY ALONG THE STREETS OF HOMESTEAD DANIEL
FARMS SUBDIVISION IN DESOTO, DALLAS COUNTY. RESIDENTIAL DESOTO GROWTH DECEMBER
5367 080.76138 122,245 INSTALL 40 FEET OF 2 INCH, 160 FEET OF 4 INCH POLY AND DISTRICT REGULATOR S ALL CUSTOMERS PALMER SYSTEM INTEGRITY SEPTEMBER
5368 080.76140 115,590 INSTALL 40 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY AND DISTRICT REGULATOR ST ALL CUSTOMERS PALMER SYSTEM INTEGRITY DECEMBER
5369 080.76141 525,530
INSTALL 1,200 FEET OF 4 INCH, 1,140 FEET OF 2 INCH ALONG FOREST TRAIL AND
PALMETTO DRIVE IN TEMPLE AND ABANDON 2,250 FEET OF 2 INCH IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER
5370 080.76143 844,704
INSTALL 1,255 FEET OF 6 INCH, 2,245 FEET OF 4 INCH ALONG WESTMORELAND IN
DALLAS AND ABANDON 1,210 FEET OF 6 INCH, 360 FEET OF 4 INCH, 1,796 FEET OF
3 INCH, AND 338 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5371 080.76144 5,799 INSTALL 62 FEET OF 2 INCH POLY ALONG ROSWELL AVENEUE. RESIDENTIAL GRANGER GROWTH JULY
5372 080.76145 364,836
INSTALL 1,300 FEET OF 6 INCH AND 60 FEET OF 2 INCH POLY ALONG OVERTON
STREET AND ABANDON 1,300 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5373 080.76149 446,496 INSTALL 1,900 FEET OF 2 INCH POLY ALONG THE ALLEY BETWEEN EAST ELM STREE ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY DECEMBER
5374 080.76150 181,499
INSTALL 1,850 FEET OF 2 INCH POLY ALONG LEONARD STREET AND ABANDON 500
FEET OF 2 INCH POLY AND 1,225 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL SYSTEM INTEGRITY SEPTEMBER
5375 080.76151 415,262 INSTALL 1,065 FEET OF 2 INCH, 25 FEET OF 4 INCH, 1,210 FEET OF 6 INCH POLY ALO ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
5376 080.76154 20,384 INSTALL 350 FEET OF 2 INCH POLY ALONG BATAAN AND BEDFORD, RESIDENTIAL DALLAS GROWTH SEPTEMBER
5377 080.76160 23,050
INSTALL TWO (2) INCH MOONEY REGULATORS ON MCKINNEY DISTRICT
REGULATOR STATION #04 AND ABANDON TWO (2) 1 INCH MOONEY REGULATOR TO
INCREASE CAPACITY. ALL CUSTOMERS MCKINNEY
SYSTEM
IMPROVEMENT JUNE
5378 080.76161 74,761
INSTALL 300 FEET OF 2 INCH POLY ALONG GEORGE AVENUE AND ABANDON 280
FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL SYSTEM INTEGRITY JUNE
5379 080.76166 110,271
INSTALL 350 FEET OF 4 INCH POLY ALONG HIGHLAND DRIVE AND ABANDON 340
FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY JULY
5380 080.76168 128,693
INSTALL LAPTOPS, MIC TRUCK RETROFIT DOCK AND POWERSUPPLY, MODEM AND
DOCKING STATIONS IN FORT WORTH SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT NOVEMBER
5381 080.76173 15,719
INSTALL 770 FEET OF 2 INCH POLY ALONG THE STREETS OF THE OAKS AT TOWER
RIDGE SUBDIVISION IN CORINTH, DENTON COUNTY. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL CORINTH GROWTH DECEMBER
5382 080.76174 5,006 INSTALL 2 SNESIT GOLD LEAK DETECTORS IN WAXAHACHIE. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT MARCH
5383 080.76176 8,596
INSTALL 110 FEET OF 2 INCH POLY ALONG ELOISE STREET IN THE CITY OF
CALDWELL. RESIDENTIAL CALDWELL GROWTH JUNE
5384 080.76178 2,340
INSTALL 320 FEET OF 2 INCH POLY ALONG SOUTH COOPER STREET. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL ARLINGTON GROWTH SEPTEMBER
5385 080.76179 1,526
PURCHASE NETWORK UNINTERRUPTABLE POWER SUPPLY (UPS) FOR WEST
REGION - SWEETWATER OFFICE. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT JUNE
5386 080.76180 283,910
REPLACE 4 LAPTOPS, 76 DELL RUGGED LAPTOPS, 76 TRUCK WITH POWER
SUPPLY, 50 DOCKS IN DALLAS ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT DECEMBER
5387 080.76182 3,913
RELOCATE FACILITIES. INSTALL 150 FEET OF 2 INCH POLY TO ALONG KNOLL
DRIVE NEAR CRESTWAY DRIVE. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER
5388 080.76183 101,145
REPLACE LAPTOPS IN ATHENS SERVICE CENTER, GARLAND SERVICE CENTER
AND LONGVIEW SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT NOVEMBER
5389 080.76187 341,515
INSTALL 2,243 FEET OF 4 INCH AND 2,039 FEET OF 2 INCH POLY ALONG THE
STREETS OF CHISHOLM HILLS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CLEBURNE GROWTH OCTOBER
5390 080.76189 38,966
INSTALL 80 FEET OF 2 INCH POLY AND ABANDON 80 FEET OF 2 INCH POLY ALONG
TIMBERVIEW STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY JUNE
5391 080.76192 146,608 INSTALL 550 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #13 ALONG ALL CUSTOMERS ABILENE SYSTEM INTEGRITY SEPTEMBER
5392 080.76194 74,143 INSTALL 750 FEET OF 2 INCH POLY ALONG OAKHURST SCENIC DRIVE.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH DECEMBER
5393 080.76198 612,159 INSTALL 2,113 FEET OF 6 INCH POLY ALONG MYRTA STREET AND WHELESS AVENUE ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY DECEMBER
5394 080.76199 469,406
INSTALL 1,903 FEET OF 2 INCH POLY IN ALLEY BETWEEN WHELESS AVENUE AND
PRESCOTT STREET AND 442 FEET OF 4 INCH POLY ALONG OAKS STREET IN
KERRVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER
5395 080.76200 387,211
INSTALL 2,397 FEET OF 2 INCH POLY ALONG MOORE STREET AND IN ALLEY
BETWEEN WASHINGTON STREET AND OAK STREET IN KERRVILLE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY DECEMBER
5396 080.76201 359,788
INSTALL 2,607 FEET OF 2 INCH POLY ALONG E. MAIN STREET, JEFFERSON STREET
AND ARANSAS STREET IN KERRVILLE IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY DECEMBER
5397 080.76202 460,957
INSTALL 2,007 FEET OF 4 INCH POLY ALONG LYTLE STREET AND JEFFERSON
STREET AND 662 FEET OF 2 INCH POLY ALONG 1ST STREET IN KERRVILLE, KERR
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY DECEMBER
MTX Additions
Page 155 of 178
374
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5398 080.76205 205,242
INSTALL 1,762 FEET OF 2 INCH POLY AND ABANDON 1,443 FEET OF 2 INCH STEEL
ALONG CHAMBERLAIN STREET IN IRVING IN ACCORDANCE WITH RAIL ROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER
5399 080.76210 10,458 INSTALL 772 FEET OF 4 INCH POLY ALONG SOUTH FREEWAY.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH JULY
5400 080.76216 757,218
INSTALL 8,160 FEET OF 2 INCH, 1,905 FEET OF 4 INCH AND 1,910 FEET OF 12 INCH
POLY ALONG THE STREETS OF WINDROSE SUBDIVISION IN PILOT POINT. RESIDENTIAL PILOT POINT GROWTH DECEMBER
5401 080.76217 526,875
INSTALL 2,160 FEET OF 2 INCH POLY ALONG EMBERWOOD AND FAIRWOOD AND
ABANDON 2,110 FEET OF 3 INCH STEEL AND 100 FEET OF 3 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5402 080.76230 14,291 INSTALL 1,000 FEET OF 4 INCH POLY ALONG REDBUD BOULEVARD IN MCKINNEY.
COMMERCIAL OR
INDUSTRIAL MCKINNEY GROWTH SEPTEMBER
5403 080.76234 6,346
INSTALL 1,579 FEET OF 2 INCH POLY ALONG THE STREETS OF STONE RIDGE
SUBDIVISION IN FREDERICKSBURG. RESIDENTIAL FREDERICKSBURG GROWTH OCTOBER
5404 080.76235 1,621
PURCHASE A DIGITAL LOCATOR MARKER BALL FOR THE SAN ANGELO C & M
DISTRICT. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT JUNE
5405 080.76242 19,681
PURCHASE AND INSTALL NEW CARD READER ON FRONT EXTERIOR DOOR OF
MCKINNEY SERVICE CENTER ALONG CORPORATE DRIVE. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER
5406 080.76243 3,855
INSTALL 600 FEET OF 4 INCH POLY ALONG TXDOT NE LOOP 820 SERVICE ROAD IN
NORTH RICHLAND HILLS.
COMMERCIAL OR
INDUSTRIAL NORTH RICHLAND HILLS GROWTH SEPTEMBER
5407 080.76248 16,073
INSTALL 1 REGULATOR AND ABANDON 1 REGULATOR AT WESTLAKE CITY GATE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY JULY
5408 080.76249 21,955
INSTALL 4,800 FEET OF 2 INCH POLY ALONG THE STREETS OF CAMEY PLACE
SUBDIVISION. RESIDENTIAL THE COLONY GROWTH OCTOBER
5409 080.76250 760,269 INSTALL 2,170 FEET OF 2 INCH , 330 FEET OF 4 INCH POLY IN THE ALLEY BETWEEN F ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5410 080.76252 248,138
INSTALL 1,080 FEET OF 4 INCH AND 4,750 FEET OF 2 INCH POLY ALONG THE
STREETS OF TRAILS OF ELIZABETH CREEK SUBDIVSION. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
5411 080.76256 229,841 RELOCATE FACILITIES. INSTALL 65 FEET OF 2 INCH AND 1,050 FEET OF 4 INCH POLY ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY DECEMBER
5412 080.76258 130,172
INSTALL 5,200 FEET OF 2 INCH POLY ALONG THE STREETS OF RIDGE PARK
ESTATES SUBDIVISION IN ROYSE CITY, ROCKWALL COUNTY. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH DECEMBER
5413 080.76259 53,940
INSTALL 850 FEET OF 4 INCH POLY ALONG MARY DRIVE AND WILLOW STREET IN
HURST AND ABANDON 786 FEET OF 4 INCH STEEL AND 34 FEET OF 4 INCH POLY IN
ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY OCTOBER
5414 080.76260 295,589
INSTALL 430 FEET OF 2 INCH AND 1,230 FEET OF 6 INCH POLY ALONG BUENA
VISTA DRIVE IN HURST AND ABANDON 501 FEET OF 1.25 INCH POLY AND 1,800
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
5415 080.76262 212,109
INSTALL 1,480 FEET OF 2 INCH POLY ALONG WEST CEDAR STREET AND ABANDON
1,436 FEET OF 2 INCH POLY AND 19 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
5416 080.76263 278,380
INSTALL 1,655 FEET OF 4 INCH POLY ALONG WEST OAK STREET AND ABANDON 16
FEET OF 2 INCH, 87 FEET OF 4 INCH STEEL AND 967 FEET OF 2 INCH, 20 FEET OF 3
INCH, AND 9 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
5417 080.76264 355,480 INSTALL 2,155 FEET OF 4 INCH POLY ALONG NORWOOD DRIVE AND EAST OAK DRIV ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
5418 080.76265 331,537
INSATLL 1,534 FEET OF 4 INCH POLY ALONG NORWOOD DRIVE IN HURST AND
ABANDON 609 FEET OF 4 INCH POLY AND 1,340 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
5419 080.76266 431,105 INSTALL 1,900 FEET OF 6 INCH POLY ALONG WILLOW STREET AND HARRISON LANE ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
5420 080.76267 234,803 ISNTALL 1,500 FEET OF 6 INCH POLY ALONG HARRISON LANE AND REDBUD DRIVE IN ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
5421 080.76268 200,536
INSTALL 1,293 FEET OF 2 INCH POLY ALONG ELM STREET IN HURST AND
ABANDON 1,229 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
5422 080.76269 195,046
INSTALL 1,250 FEET OF 4 INCH POLY ALONG PECAN STREET IN HURST AND
ABANDON 12 FEET OF 4 INCH STEEL AND 1,307 FEET OF 4 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
5423 080.76270 253,367
ISNTALL 1,765 FEET OF 2 INCH POLY ALONG SOUDER DRIVE AND HARMON ROAD
IN HURST AND ABANDON 1,773 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
5424 080.76293 75,466
INSTALL 43 FEET OF 4 INCH AND 2 FEET OF 4 INCH ALONG WEST WHITE STREET
AT SOUTH WASHINGTON STREET AND ABANDON 35 FEET OF 4 INCH AND 5 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS PILOT POINT SYSTEM INTEGRITY SEPTEMBER
5425 080.76315 816,741
INSTALL 2,450 FETT OF 6 INCH, 350 FEET OF 2 INCH POLY ALONG BARDFIELD
AVENUE ALLEY FROM KEYSTONE STREET TO SEQUOIA DRIVE AND ABANDON 2,450
FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5426 080.76330 258,966
INSTALL 1,170 FEET OF 6 INCH POLY ALONG BARDFIELD AVENUE ALLEY FROM
SEQUOIA DRIVE TO CENTERVILLE ROAD IN GARLAND AND ABANDON 1,170 FEET
OF 6 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5427 080.76332 573,631
INSTALL 2,680 FEET OF 2 INCH POLY ALONG KEYSTONE STREET FROM BARDFIELD
AVENUE TO SHADWELL DRIVE AND ABANDON 2,150 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5428 080.76335 1,074,902
INSTALL 2,450 FEET OF 2 INCH POLY ALONG KAZAK STREET FROM BARDFIELD
AVENUE TO SHADWELL DRIVE AND ABANDON 2,430 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5429 080.76338 744,348
INSTALL 3,000 FEET OF 2 INCH POLY ALONG KEELE DRIVE FROM BARDFIELD
AVENUE TO SHADWELL DRIVE IN GARLAND AND ABANDON 2,430 FEET OF 2 INCH
POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5430 080.76339 275,799
INSTALL 2,085 FEET OF 2 INCH POLY AND ABANDON 1,100 FEET OF 2 INCH POLY
ALONG BARDFIELD AVENUE FROM NIAGARA STREET TO CENTERVILEE ROAD IN
GARLAND IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY OCTOBER
5431 080.76343 353,748
INSTALL 2,070 FEET OF 2 INCH POLY ALONG NIAGARA STREET FROM
CANDLEWOOD LANE TO BARDFIELD AVENUE IN GARLAND AND ABANDON 1,320
FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5432 080.76346 225,183
INSTALL 920 FEET OF 2 INCH POLY ALONG SEQUOIA DRIVE FROM NIAGARA
STREET TO BARDFIELD AVENUE IN GARLAND AND ABANDON 900 FEET OF 2 INCH
POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5433 080.76347 215,799
INSTALL 1,210 FEET OF 2 INCH POLY ALONG CASHMERE DRIVE FROM NIAGARA
STREET TO BARDFIELD AVENUE IN GARLAND AND ABANDON 1,200 FEET OF 2 INCH
POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER
5434 080.76349 434,385
INSTALL 1,110 FEET OF 2 INCH POLY ALONG MAYFIELD AVENUE FROM KEELE
DRIVE TO CANDLEWOOD LANE IN GARLAND AND ABANDON 750 FEET OF 2 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5435 080.76350 206,964
INSTALL 1,270 FEET OF 2 INCH POLY ALONG CANDLEWOOD LANE FROM MAYFIELD
AVENUE TO BARDFIELD AVENUE IN GARLAND AND ABANDON 1,300 FEET OF 2 INCH
POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5436 080.76352 35,064 INSTALL 600 FEET OF 2 INCH POLY ALONG BEASON STREET. RESIDENTIAL BRYAN GROWTH SEPTEMBER
5437 080.76353 17,684
PURCHASE AND INSTALL CARD READER FOR NORTH GATE AT HILLSBORO FOR
SAFETY CONCERNS DUE TO ADDED TRAFFIC. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JULY
MTX Additions
Page 156 of 178
375
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5438 080.76354 366,244
INSTALL 2,850 FEET OF 4 INCH POLY ALONG THE STREETS OF COLLINSVILLE AND
ABANDON 1,630 FFET OF 3 INCH STEEL, 320 FEET OF 3 INCH AND 218 FEET OF 4
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS COLLINSVILLE SYSTEM INTEGRITY DECEMBER
5439 080.76355 11,564
REPLACE THE TEN YEAR OLD IRREPARABLE PLOTTER AT THE BRYAN SERVICE
CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT JUNE
5440 080.76356 436,373
INSTALL 1,780 FEET OF 2 INCH POLY ALONG BRAEMAR DRIVE AND ABANDON 1,600
FEET OF 2 INCH STEEL AND 195 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER
5441 080.76358 6,701
INSTALL 1,531 FEET OF 4 INCH POLY ALONG THE STREETS OF BOOT RANCH
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FREDERICKSBURG GROWTH DECEMBER
5442 080.76359 4,099
INSTALL 975 FEET OF 2 INCH AND 815 FEET OF 4 INCH ALONG THE STREETS OF
BOOT RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL UNINCORPORATED GROWTH SEPTEMBER
5443 080.76360 53,683
INSTALL 1,115 FEET OF 4 INCH AND 1,106 FEET OF 2 INCH POLY ALONG THE
STREETS OF BOOT RANCH SUBDIVISION. DEVELOPER INSTALLED FACILTITIES. RESIDENTIAL FREDERICKSBURG GROWTH SEPTEMBER
5444 080.76364 (1,880)
INSTALL 80 FEET OF 4 INCH POLY AND ABANDON 60 FEET OF 4 INCH POLY
ASSOCIATED WITH A UTILITY CONFLICT. ALL CUSTOMERS WILMER
RELOCATION OF
FACILITIES NOVEMBER
5445 080.76366 389,033
INSTALL 3,295 FEET OF 4 INCH AND 3,900 FEET OF 2 INCH POLY ALONG THE
STREETS OF BAILEY PARK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER
5446 080.76368 11,946 INSTALL 100 FEET OF 2 INCH POLY ALONG GOOD JOHN STREET. RESIDENTIAL COLLINSVILLE GROWTH JULY
5447 080.76370 71,044
INSTALL 20 FEET OF 6 INCH STEEL ALONG HK DODGEN LOOP IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY JUNE
5448 080.76371 295,418
INSTALL 3,277 FEET OF 2 INCH AND 1,375 FEET OF 6 INCH POLY ALONG THE
STREETS OF DURANGO FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH DECEMBER
5449 080.76375 154,844
INSTALL DISTRICT REGULATOR STATION #01, 80 FEET OF 4 INCH POLY BETWEEN
WEST 3RD STREET AND 2ND STREET IN VENUS AND ABANDON DISTRICT
REGULATOR STATION #01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS VENUS SYSTEM INTEGRITY DECEMBER
5450 080.76376 740,192
INSTALL 182 SUSL ALONG STREETS IN DUNCANVILLE IN ACCORDANCE WITH RAIL
ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY SEPTEMBER
5451 080.76378 57,042
INSTALL 215 FEET OF 4 INCH POLY ALONG SPEEDWAY AND MARIE AND ABANDON
215 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
5452 080.76379 777,254 RELOCATE FACILITIES. INSTALL 1,233 FEET OF 2 INCH AND 2,000 FEET OF 4 INCH PO ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY DECEMBER
5453 080.76380 4,245
INSTALL 1,150 FEET OF 4 INCH AND 5,370 FEET OF 2 INCH POLY ALONG THE
STREETS OF FOX HOLLOW SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH DECEMBER
5454 080.76382 360,154
INSTALL 1,159 FEET OF 6 INCH, 196 FEET OF 4 INCH AND 735 FEET OF 2 INCH POLY
ALONG WEST CENTRAL AND ABANDON 1,949 FEET OF 2 INCH STEEL AND 160 FEET
OF 3 INCH POLY IN GEORGETOWN, WILLIAMSON COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY DECEMBER
5455 080.76385 1,486
PURCHASE ONE 4-STROKE GAS CONCRETE SAW FOR THE SWEETWATER
DISTRICT. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT APRIL
5456 080.76390 819,509
INSTALL 2,325 FEET OF 6 INCH POLY ALONG BROCKBANK NORTH OF WALNUT HILL
IN DALLAS AND ABANDON 2,325 FEET OF 6 INCH STEEL AND 10 FEET OF 6 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5457 080.76392 2,395 PURCHASE DELL LATITUDE 9520, XCTO. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT MARCH
5458 080.76394 40,437
INSTALL 800 FEET OF 4 INCH POLY ALONG JOHN CARPENTER FREEEWAY IN
IRVING. ALL CUSTOMERS IRVING GROWTH DECEMBER
5459 080.76398 3,595
INSTALL 4,600 FEET OF 2 INCH POLY ALONG THE STREETS OF RIDGE LAKE
SUBDIVISION IN HEATH, ROCKWALL COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HEATH GROWTH DECEMBER
5460 080.76402 344,595
INSTALL 1,785 FEET OF 2 INCH POLY ALONG WHIRLAWAY NEAR HARWICH IN
DALLAS AND ABANDON 1,785 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5461 080.76405 2,097
INSTALL 60 FEET OF 2 INCH POLY ALONG DOGWOOD DRIVE AND ABANDON 45
FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY SEPTEMBER
5462 080.76407 15,867
ISNTALL 3,240 FEET OF 4 INCH AND 4,760 FEET OF 2 INCH POLY ALONG THE
STREETS OF SENDERA RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
5463 080.76408 31,141
INSTALL 871 FEET OF 2 INCH POLY ALONG LEXINGTON PARKS SUBDIVISION IN
FRISCO. RESIDENTIAL FRISCO GROWTH SEPTEMBER
5464 080.76419 294,677
INSTALL 2,030 FEET OF 2 INCH AND 60 FEET OF 6 INCH POLY ALONG YUMA AND
PHOENIX STREETS AND ABANDON 1,010 FEET OF 2 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
5465 080.76420 392,589
INSTALL 1,650 FEET OF POLY ALONG COVINGTON IN WICHITA FALLS AND
ABANDON 1,895 FEET OF STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
5466 080.76421 220,534
INSTALL 1,425 FEET OF 2 INCH POLY ALONG YUMA AND GUNNISON IN WICHITA
FALLS AND ABANDON 825 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAIL
ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
5467 080.76422 145,645
INSTALL 1,350 FEET OF 2 INCH POLY ALONG CLOVIS AND RUIDOSA IN WICHITA
FALLAS AND ABANDON 865 FEET OF 2 INCH AND 1,020 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
5468 080.76423 82,925
PURCHASE 5430 RUGGED LAPTOPS ALONG WITH ASSOCIATED ACCESSORIES
FOR DENTON. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT JULY
5469 080.76425 356,779
INSTALL 75 FEET OF 4 INCH POLY ALONG HORNE STREET, 450 FEET OF 2 INCH
POLY ALONG CARVER DRIVE AND HELMICK AVENUE AND ABANDON 450 FEET OF 3
INCH STEEL AND 30 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5470 080.76426 240,377
INSTALL 1,890 FEET OF 2 INCH POLY ALONG RUIDOSA AND YUMA IN WICHITA
FALLS AND ABANDON 1,614 FEET OF 2 INCH AND 133 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
5471 080.76427 7,653
INSTALL 2,065 FEET OF 2 INCH POLY ALONG THE STREETS OF WILCO RANCH
SUBDIVISION IN HUTTO. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH DECEMBER
5472 080.76428 139,314
INSTALL 630 FEET OF 2 INCH POLY ALONG YUMA AND GUNNISON IN WICHITA
FALLS AND ABANDON 510 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
5473 080.76429 167,517
INSTALL 1,435 FEET OF 2 INCH POLY ALONG SHASTA AND GUNNISON IN WICHITA
FALLS AND ABANDON 454 FEET OF 2 INCH AND 453 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
5474 080.76430 422,836
INSTALL 565 FEET OF 2 INCH AND 1,120 FEET OF 6 INCH POLY AND ABANDON 1,087
FEET OF 6 INCH, AND 626 FEET OF 2 INCH STEEL ALONG TUCSON AND SKYLINE IN
WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
5475 080.76431 252,664
INSTALL 95 FEET OF 2 INCH AND 1,220 FEET OF 6 INCH POLY AND ABANDON 936
FEET OF 6 INCH, 522 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG
PHOENIX AND SHASTA IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
5476 080.76433 9,165
INSTALL 212 FEET OF 8 INCH, 235 FEET OF 4 INCH, AND 2,687 FEET OF 2 INCH
POLY ALONG THE STREETS OF COTTAGES AT PARMER RANCH. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH OCTOBER
5477 080.76434 145,245 INSTALL DISTRICT REGULATOR STATION #04, 40 FEET OF 2 INCH, AND 80 FEET OF 4 ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY DECEMBER
5478 080.76435 340,855
IMPLEMENT AT&T MPLS CIRCUITS FOR EACH OF THE 23 CONTROL WAVE
MASTERS IN THE MDTX SERVICE CENTERS. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT DECEMBER
5479 080.76440 217
INSTALL DISTRICT REGULATOR STATION #18 AND 1,300 FEET OF 2 INCH POLY
ALONG NE 36TH AND EAST MAIN IN GRAND PRAIRIE AND ABANDON DISTRICT
REGULATOR STATION #18, 400 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY DECEMBER
MTX Additions
Page 157 of 178
376
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5480 080.76448 3,119
CHANGE FLOURESCENT BULBS WITH LED BULBS AT THE BROWNWOOD SERVICE
CENTER WAREHOUSE. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JULY
5481 080.76451 535,933
INSTALL 3,245 FEET OF 2 INCH POLY INTHE ALLEY OF CARRY IN DALLAS AND
ABANDON 2,505 FEET OF 2 INCH, 710 FEET OF 3 INCH STEEL AND 30 FEET OF 2
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5482 080.76458 712,363
INSTALL 960 FEET OF 12 INCH POLY ALONG SOUTH 2ND STREET AND GURLEY IN
WACO AND ABANDON 960 FEET OF 12 STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
5483 080.76460 22,329
INSTALL 984 FEET OF 8 INCH AND 3,634 FEET OF OF 2 INCH POLY ALONG THE
STREETS OF PARKSIDE ON THE RIVER SUBDIVISION IN GEORGETOWN,
WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER
5484 080.76461 669,003
INSTALL 2,945 FEET OF 2 INCH POLY ALONG THE ALLEY OF WHIRLAWAY NEAR
DALE CREST IN DALLAS AND ABANDON 2,600 FEET OF 2 INCH STEEL AND 345
FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5485 080.76462 29,539
INSTALL 1,386 FEET OF 8 INCH, 456 FEET OF 4 INCH AND 4,466 FEET OF 2 INCH
POLY ALONG THE STREETS OF PARKSIDE ON THE RIVER SUBDIVISION IN
GEORGETOWN, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER
5486 080.76468 58,201
INSTALL 175 FEET OF 2 INCH POLY ALONG FEATHERSTONE DRIVE AND ABANDON
110 FEET OF 2 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY JUNE
5487 080.76469 513,850
INSTALL 6,596 FEET OF 2 INCH, 1,205 FEET OF 4 INCH AND 1,476 FEET OF 12 INCH
POLY ALONG THE STREETS OF HONEY CREEK SUBDIVISION IN MCKINNEY. RESIDENTIAL MCKINNEY GROWTH DECEMBER
5488 080.76470 23,266
INSTALL 6,310 FEET OF 2 INCH AND 1,083 FEET OF 4 INCH POLY ALONG THE
STREETS OF COTTAGES SUBDIVISION IN CELINA, COLLIN COUNTY. RESIDENTIAL CELINA GROWTH DECEMBER
5489 080.76472 273,279
INSTALL 3,500 FEET OF 2 INCH AND 3,700 FEET OF 4 INCH POLY ALONG THE
STREETS OF ARCADIA TRAILS SUBDIVISION IN BALCH SPRINGS. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL BALCH SPRINGS GROWTH DECEMBER
5490 080.76473 262,054 INSTALL DISTRICT REGULATOR STATION #01 AND 30 FEET OF 2 INCH AND 100 FEET ALL CUSTOMERS MUENSTER SYSTEM INTEGRITY DECEMBER
5491 080.76478 6,006
INSTALL 170 FEET OF 4 INCH AND ABANDON 170 FEET OF 2 INCH ALONG
CEDARDALE ROAD IN DALLAS. ALL CUSTOMERS DALLAS
SYSTEM
IMPROVEMENT SEPTEMBER
5492 080.76481 53,165
RELOCATE FACILITIES.
INSTALL 80 FEET OF 2 INCH POLY ALONG CHERRY STREET AND ABANDON 80 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY JUNE
5493 080.76482 283,826
INSTALL 1,930 FEET FO 2 INCH, 120 FEET OF 4 INCH AND 1,440 FEET OF 6 INCH
POLY ALONG THE STREETS OF TRADITION SUBDIVISION IN FORT WORTH, DENTON
COUNTY. RESIDENTIAL FORT WORTH GROWTH DECEMBER
5494 080.76483 130,173 RELOCATE FACILITIES. INSTALL 225 FEET OF 2 INCH AND 725 FEET OF 4 INCH POLY ALL CUSTOMERS EVERMAN SYSTEM INTEGRITY SEPTEMBER
5495 080.76490 243,645
INSTALL 440 FEET OF 4 INCH POLY ALONG AVE A AND 10TH NE AND ABANDON 440
FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY DECEMBER
5496 080.76491 70,976
INSTALL LINE D GROUNDBED AND RECTIFIER AT 4911+17 AND ABANDON LINE D
GROUNDBED AND RECTIFIER IN ARLINGTON, TARRANT COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER
5497 080.76492 102,091
INSTALL 1,000 FEET OF 8 INCH, 6,550 FEET OF 6 INCH, 4,895 FEET OF 4 INCH POLY
ALONG THE STREETS OF SAPPHIRE BAY SUBDIVISION IN ROWLETT. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL ROWLETT GROWTH DECEMBER
5498 080.76496 304,616
INSTALL 425 FEET OF 2 INCH POLY AND ABANDON 420 FEET OF 2 INCH STEEL
ALONG SHILOH STREET IN GARLAND, DALLAS COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5499 080.76498 557,151
INSTALL 1,473 FEET OF 6 INCH POLY AND ABANDON 1,477 FEET OF 2 INCH STEEL
ALONG EAST HICKORY HILL ROAD IN ARGYLE, DENTON COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARGYLE SYSTEM INTEGRITY DECEMBER
5500 080.76501 12,862
PROVIDE AND INSTALL 12'X12' CHI ROLLING STEEL DOOR WITH OPERATOR
INSPECTION TRAINING WAREHOUSE. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JUNE
5501 080.76504 (17,070)
RELOCATE FACILITIES.
INSTALL 600 FEET OF 6 INCH POLY ALONG HARRIS RIDGE BOULEVARD AND JOHN
HENRY FAULK DRIVE IN PFLUGERVILLE AND ABANDON 700 FEET OF 6 INCH POLY. ALL CUSTOMERS PFLUGERVILLE
RELOCATION OF
FACILITIES DECEMBER
5502 080.76508 178,087
INSTALL 640 FEET OF 8 INCH POLY ALONG EDGEWOOD TERRACE AND ABANDON
640 FEET OF 8 INCH STEEL TO ACCOMODATE CITY OF FORT WORTH STREET
PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
5503 080.76509 114,949
INSTALL 850 FEET OF 2 INCH POLY ALONG SIMMONS DRIVE AND ABANDON 798
FEET OF 4 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE
8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
5504 080.76510 434,957 INSTALL 1,887 FEET OF 2 INCH, 1,013 FEET OF 4 INCH, 256 FEET OF 6 INCH POLY ALO ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY OCTOBER
5505 080.76511 500,128
INSTALL 1,629 FEET OF 2 INCH, 1,150 FEET OF 6 INCH POLY ALONG MAIN STREET
IN MADISONVILLE AND ABANDON 815 FEET OF 4 INCH, 1,095 FEET OF 2 INCH POLY
AND 750 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY DECEMBER
5506 080.76513 627,693
INSTALL 943 FEET OF 4 INCH, 2,689 FEET OF OF 2 INCH POLY. ABANDON 556 FEET
OF 3 INCH, 1,303 FEET OF 2 INCH STEEL AND 263 FEET OF 3 INCH AND 756 FEET OF
2 INCH POLY ALONG MAY STREET IN MADISONVILLE, MADISON COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY DECEMBER
5507 080.76514 520,141
INSTALL 378 FEET OF 2 INCH, 98 FEET OF 4 INCH, 1,960 FEET OF 6 INCH POLY AND
ABANDON 98 FEET OF 4 INCH POLY, 1.972 FEET OF 4 INCH STEEL ALONG MAIN
STREET IN MADISONVILLE, MADISON COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY DECEMBER
5508 080.76515 417,777
INSTALL 2,032 FEET OF 2 INCH, 1,003 FEET OF 6 INCH POLY AND ABANDON 1,324
FEET OF 2 INCH, 526 FEET OF 4 INCH STEEL AND 406 FEET OF 2 INCH, 468 FEET
OF 4 INCH POLY ALONG MAY STREET IN MADISONVILLE, MADISON COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY DECEMBER
5509 080.76516 473,544
INSTALL 420 FEET OF 2 INCH, 2,078 FEET OF 4 INCH POLY AND ABANDON 907 FEET
OF 4 INCH, 523 FEET OF 3 INCH, 536 FEET OF 2 INCH STEEL AND 52 FEET OF 3 INCH
44 FEET OF 2 INCH POLY ALONG MAY STREET IN MADISONVILLE, MADISON
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY DECEMBER
5510 080.76519 4,952
INSTALL 5,075 FEET OF 4 INCH POLY ALONG BERRY ROAD. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL MESQUITE GROWTH OCTOBER
5511 080.76521 132,753
INSTALL 380 FEET OF 4 INCH POLY ALONG THE STREETS OF COPPELL AND
ABANDON 250 FEET OF 4 INCH POLY AND 130 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COPPELL SYSTEM INTEGRITY JULY
5512 080.76522 521,514
INSTALL 1,642 FEET OF 4 INCH ALONG NORTH 27TH STREET FROM PARK LAKE
DRIVE TO EDNA AVENUE IN WACO ABANDON 1,512 FEET OF 2 INCH STEEL AND 125
FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY OCTOBER
5513 080.76523 24,632
INSTALL 6 FEET OF 10 INCH STEEL ALONG STREETS IN ABILENE AND ABANDON 5
FEET OF 10 INCH STEEL. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY JUNE
5514 080.76524 194,238
INSTALL 3,900 FEET OF 2 INCH AND 950 FEET OF 4 INCH POLY ALONG THE
STREETS OF WYNDHAM RIDGE SUBDIVISION IN WYLIE. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL WYLIE GROWTH DECEMBER
5515 080.76525 43,535
INSTALL 1,640 FEET OF 4 INCH AND 1,855 FEET OF 2 INCH POLY ALONG THE
STREETS OF LA FRONTERA SUBDIVSION IN FORT WORTH. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER
5516 080.76526 95,516
INSTALL 2,900 FEET OF 2 INCH POLY ALONG THE STREETS OF OVERLAND GROVE
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH OCTOBER
5517 080.76527 207,912
INSTALL 1,970 FEET OF 4 INCH, 3,500 FEET OF 2 INCH POLY ALONG BIRD STONE
DRIVE IN BRIARWOOS HILLS SUBDIVISION IN FORNEY. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL FORNEY GROWTH DECEMBER
MTX Additions
Page 158 of 178
377
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5518 080.76532 91,086
INSTALL 3,855 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKE SHORE
VILLAGE SUBDIVISION IN ROWELETT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROWLETT GROWTH DECEMBER
5519 080.76535 23,742
INSTALL 280 FEET OF 2 INCH POLY ALONG CHANDLER AND DAY STREET AND
ABANDON 283 FEET OF 3 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD
COMISSION RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY JULY
5520 080.76538 510,225
INSTALL 2,520 FEET OF 2 INCH POLY ALONG NORTH 29TH STREET FROM PARK
LAKE DRIVE TO EDNA AVENUE IN WACO AND ABANDON 2,019 FEET OF 2 INCH
STEEL, 135 FEET OF 2 INCH POLY, 299 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. OF 1.25 INCH POLY ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
5521 080.76544 350,349
REPLACEMENT AND INCREMENTAL TOOLS. STEEL AND POLY SQUEEZE TOOLS
FOR USE THROUGHOUT THE DIVISION FISCAL YEAR 2022. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT JUNE
5522 080.76550 55,957
INSTALL 120 FEET OF 2 INCH POLY ALONG FM 27 ALONG THE STREETS OF CITY
OF FAIRFIELD.
COMMERCIAL OR
INDUSTRIAL FAIRFIELD GROWTH JUNE
5523 080.76554 56,762
INSTALL 1,080 FEET OF 8 INCH, 3,400 FEET OF 2 INCH POLY ALONG STREETS OF
ROLLING RIDGE SUBDIVISION IN VAN ALSTYNE, GRAYON COUNTY. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL VAN ALSTYNE GROWTH DECEMBER
5524 080.76555 172,838
INSTALL 2,340 FEET OF 8 INCH POLY ALONG HWY 5 AND REDDEN ROAD IN VAN
ALSTYNE IN GRAYSON COUNTY. ALL CUSTOMERS VAN ALSTYNE GROWTH DECEMBER
5525 080.76556 470,072
INSTALL 2,435 FEET OF 2 INCH POLY ALONG NORTH 31ST STREET FROM PARK
LAKE DRIVE TO EDNA AVENUE IN WACO AND ABANDON 521 FEET OF 2 INCH POLY,
AND 1,924 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
5526 080.76557 246,038 INSTALL 1,500 FEET OF 2 INCH POLY ALONG MLK JR BOULEVARD, SOUTH YOUNG S ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY DECEMBER
5527 080.76560 28,632
INSTALL 3,300 FEET OF 2 INCH POLY ALONG THE STREETS OF DEVONSHIRE
VILLAGE 8 SUBDIVISION IN FORNEY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH DECEMBER
5528 080.76562 88,564
INSTALL 2,800 FEET OF 6 INCH AND 4,700 FEET OF 2 INCH POLY ALONG THE
STREETS OF DEVONSHIRE VILLAGE 14 SUBDIVISION IN FORNEY, KAUFMAN
COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH DECEMBER
5529 080.76571 160,233
INSTALL 20 FEET OF 8 INCH STEEL AT L20-2 STATION IN GEORGETOWN AND
ABANDON SKID BUILT STATION IN ACCORDANCE WITH RAIL ROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY DECEMBER
5530 080.76574 401,719
INSTALL 3,250 FEET OF 6 INCH, 3,000 FEET OF 4 INCH AND 1,800 FEET OF 2 INCH
POLY ALONG THE STREETS OF SPRINGHILLS SUBDIVISION IN BOYD. RESIDENTIAL BOYD GROWTH DECEMBER
5531 080.76575 295,451 INSTALL 800 FEET OF 2 INCH POLY ALONG SOUTH DALLAS AVENUE AND PECAN STR ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY DECEMBER
5532 080.76577 3,294 NEW PEDESTAL FOR VEHICLE 21140 IN MCKINNEY ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT SEPTEMBER
5533 080.76580 162,004 INSTALL DISTRICT REGULATOR STATION #01 NORTH OF THE MITCHUM AND COLLEG ALL CUSTOMERS MALAKOFF SYSTEM INTEGRITY DECEMBER
5534 080.76581 46,269 INSTALL 750 FEET OF 2 INCH POLY ALONG PGA PARKWAY IN FRISCO.
COMMERCIAL OR
INDUSTRIAL FRISCO GROWTH SEPTEMBER
5535 080.76582 396,789 RELOCATE FACILITIES. INSTALL 2,200 FEET OF 6 INCH AND 20 FEET OF 4 INCH POLY ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5536 080.76587 962,958
INSTALL 1,850 FEET OF 12 INCH POLY ALONG JENNINGS AVE AND ABANDON 5
FEET OF 12 INCH POLY IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5537 080.76588 23,468 INSTALL 330 FEET OF 2 INCH POLY ALONG FAIR GREEN DRIVE. RESIDENTIAL TROPHY CLUB GROWTH DECEMBER
5538 080.76589 165,811
INSTALL 1,620 FEET OF 8 INCH AND 10 FEET OF 2 INCH POLY ALONG SOUTH
HARDIN BOULEVARD AND MCKINNEY RANCH PARKWAY IN MCKINNEY, ALL CUSTOMERS MCKINNEY GROWTH OCTOBER
5539 080.76590 143,925
INSTALL 800 FEET OF 4 INCH, 300 FEET OF 2 INCH POLY ALONG SOUTH 31ST IN
CORSICANA AND ABANDON 603 FEET OF 2 INCH, 580 FEET OF 3 INCH POLY AND
106 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY DECEMBER
5540 080.76591 324,054
RELOCATE FACILITIES. INSTALL 1,571 FEET OF 6 INCH, 15 FEET OF 4 INCH POLY
ALONG TURNER WARNELL ROAD AND ABANDON 873 FEET OF 6 INCH AND 789
FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5541 080.76592 17,948
INSTALL 535 FEET OF 2 INCH POLY ALONG SOUTH HARDIN BOULEVARD IN
MCKINNEY.
COMMERCIAL OR
INDUSTRIAL MCKINNEY GROWTH OCTOBER
5542 080.76612 9,034
INSTALL 1,700 FEET OF 4 INCH POLY ALONG TX 121 IN BONHAM, FANNIN COUNTY.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL BONHAM GROWTH DECEMBER
5543 080.76615 16,986 INSTALL A 4 INCH METER STATION ALONG BELTLINE IN LANCASTER. ALL CUSTOMERS LANCASTER GROWTH DECEMBER
5544 080.76621 28,822
INSTALL INTERNET EQUIPMENT, RADIOS AND BACKUP POWR AT VARIOUS
LOCATIONS IN DALLAS. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT DECEMBER
5545 080.76624 4,887
INSTALL 305 FEET OF 4 INCH POLY ALONG THE STREETS OF DENTON CROSSING
SUBDIVISION IN DENTON. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL DENTON GROWTH DECEMBER
5546 080.76627 5,205 INSTALL LED LIGHTS IN VERNON SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JUNE
5547 080.76628 465,578
INSTALL 2,975 FEET OF 2 INCH POLY ALONG THE STREETS OF GOLDTHWAITE AND
ABANDON 315 FEET OF 2 INCH POLY AND 2,732 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GOLDTHWAITE SYSTEM INTEGRITY DECEMBER
5548 080.76629 6,866
INSTALL 1,900 FEET OF 4 INCH POLY ALONG US HWY 82 IN BONHAM, FANNIN
COUNTY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS BONHAM GROWTH DECEMBER
5549 080.76633 1,503 RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH AND 5 FEET OF 2 INCH POLY AL ALL CUSTOMERS DENTON SYSTEM INTEGRITY JULY
5550 080.76635 606,708
MID-TEX EQUIPMENT CAPITAL FUNDING FOR THE PURCHASE OF 50 GAS TRAC LZ-
30. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT JUNE
5551 080.76638 92,163
INSTALL DISTRICT REGULATOR STATION #23, 75 FEET OF 2 INCH AND 75 FEET OF
4 INCH POLY ALONG WOODS AND BIRGE STREETS IN SHERMAN AND ABANDON
DISTRICT REGULATOR STATION #23 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY DECEMBER
5552 080.76641 5,053
INSTALL NEW FENCE AROUND DISTRICT REGULATOR STATION #18 ALONG 10TH
SOUTHEAST AND POLK STREET IN PARIS, TEXAS ALL CUSTOMERS PARIS SYSTEM INTEGRITY APRIL
5553 080.76644 1,030,193 INSTALL 3,060 FEET OF 4 INCH AND 180 FEET OF 2 INCH POLY NEAR THE INTERSECT ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5554 080.76650 282,070
RELOCATE FACILITIES. INSTALL 1,050 FEET OF 4 INCH AND 365 FEET OF 2 INCH
POLY ALONG SOUTH JUDKINS STREET AND ABANDON 1,420 FEET OF 4 INCH AND
190 FEET OF 2 INCH STEEL TO ACCOMODATE THE CITY OF FORT WORTH IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5555 080.76653 46,262 INSTALL 400 FEET OF 2 INCH POLY ALONG MELISSA COURT. RESIDENTIAL KELLER GROWTH SEPTEMBER
5556 080.76655 141,321 RELOCATE FACILITIES. INSTALL 600 FEET OF 4 INCH POLY ALONG EAST BALTIMORE ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER
5557 080.76656 1,735
INSTALL 300 FEET OF 4 INCH POLY ALONG THE STREETS OF DFW AIRPORT IN
IRVING.
COMMERCIAL OR
INDUSTRIAL IRVING GROWTH OCTOBER
5558 080.76657 607,453
INSTALL 2,460 FEET OF 4 INCH POLY BETWEEN SAN MEDINA AND GUS
THOMASSON IN DALLAS AND ABANDON 2,460 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5559 080.76658 47,091
INSTALL 460 FEET OF 2 INCH POLY ALONG BONNIE BRAE STREET RIGHT OF WAY
IN DENTON. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL DENTON GROWTH DECEMBER
5560 080.76659 621,350
INSTALL 2,075 FEET OF 12 INCH, 640 FEET OF 4 INCH AND 8,365 FEET OF 2 INCH
POLY ALONG HOMETOWN BOULEVARD IN CRANDALL. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL CRANDALL GROWTH DECEMBER
5561 080.76660 799,646
INSTALL 2,765 FEET OF 2 INCH POLY AND ABANDON 2,765 FEET OF 3 INCH STEEL
ALONG SAN MEDINA AND SAN PAULA IN DALLAS, DALLAS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5562 080.76661 275,171
INSTALL 1,100 FEET OF 2 INCH AND 600 FEET OF 4 INCH POLY AND ABANDON 174
FEET OF 4 INCH, 310 FEET OF 6 INCH, 742 FEET OF 3 INCH, 350 FEET OF 2 INCH
STEEL AND 190 FEET OF 6 INCH 100 FEET OF 2 INCH POLY ALONG WITH DISTRICT
REGULATOR STATION 02 LOCATED ON AVE 3 AND EAST 3RD IN BURKBURNETT,
WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BURKBURNETT SYSTEM INTEGRITY DECEMBER
5563 080.76662 137,496
INSTALL DISTRICT REGULATOR STATION #13 ALONG 4TH STREET NORTHWEST
AND AVENUE C NORTHWEST IN CHILDRESS AND ABANDON DISTRICT REGULATOR
STATION #13 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY DECEMBER
5564 080.76664 4,895 INSTALL 400 FEET OF 4 INCH POLY ALONG 800 MARIO COURT IN LEWISVILLE.
COMMERCIAL OR
INDUSTRIAL LEWISVILLE GROWTH SEPTEMBER
5565 080.76666 245,675
INSTALL 1,548 FEET OF 2 INCH POLY ALONG NORTH THOMPSON STREET, CRAIG
STREET IN HILLSBORO AND ABANDON 769 FEET OF 2 INCH, 350 FEET OF 4 INCH
STEEL AND 415 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY DECEMBER
5566 080.76672 112,793 INSTALL DISTRICT REGULATOR STATION #03, 65 FEET OF 4 INCH AND 30 FEET OF 6 ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER
5567 080.76673 133,946 INSTALL DISTRICT REGULATOR STATION #04 AND 185 FEET OF 4 INCH AND 30 FEET ALL CUSTOMERS VERNON SYSTEM INTEGRITY OCTOBER
MTX Additions
Page 159 of 178
378
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5568 080.76680 115,120
INSTALL DISTRICT REGULATOR STATION DRS015 AND 35 FEET OF 2 INCH 50 FEET
OF 6 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS015 AND 60
FEET OF 2 INCH, 105 FEET OF 6 INCH STEEL AND 5 FEET OF 6 INCH POLY ALONG
GRANT STREET IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
5569 080.76681 180,115
INSTALL 110 FEET OF 2 INCH, 485 FEET OF 4 INCH POLY AND DISTRICT
REGULATOR STATION DRS025 AND ABANDON DISTRICT REGULATOR STATION
DRS025 AND 297 FEET OF 3 INCH POLY AND 17 FEET OF 3 INCH, 12 FEET OF 4
INCH, AND 18 FEET OF 6 INCH STEEL ALONG GALVESTON STREET IN WICHITA
FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
5570 080.76682 558,349 INSTALL 2,104 FEET OF 4 INCH POLY ALONG THE STREETS OF FORT WORTH AND AB ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5571 080.76684 206,913
INSTALL DISTRICT REGULATOR STATION DRS64 AND 325 FEET OF 4 INCH, 325
FEET OF 6 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS64 AND
21 FEET OF 4 INCH AND 25 FEET OF 6 INCH STEEL ALONG HARRISON STREET IN
WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
5572 080.76686 213,650
INSTALL DISTRICT REGULATOR STATION DRS118 AND 445 FEET OF 2 INCH, 365
FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS118 AND
27 FEET OF 2 INCH POLY, 18 FEET OF 2 INCH, 9 FEET OF 3 INCH, AND 34 FEET OF 4
INCH STEEL IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
5573 080.76687 37,697 INSTALL 100 FEET OF 2 INCH POLY ALONG WEST PLUM. RESIDENTIAL DE LEON GROWTH DECEMBER
5574 080.76688 15,421
INSTALL 5,300 FEET OF 8 INCH POLY ALONG BELTLINE ROAD IN LANCASTER.
DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LANCASTER GROWTH DECEMBER
5575 080.76694 20,994
INSTALL UPGRADED METER AT TRINITY RIVER AUTHORITY DUE TO BOILER
INSTALL IN DALLAS, DALLAS COUNTY. ALL CUSTOMERS DALLAS GROWTH NOVEMBER
5576 080.76695 193,657
INSTALL MOTORIZED REGULATORS AND ABANDON MOTORIZED REGULATORS
ACROSS THE MDTX SYSTEM FOR 45 LOCATIONS IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER
5577 080.76697 554,977
REPLACE DISTRIBUTION MOTORIZED REGULATORS IN 95 LOCATIONS ACROSS THE
MDTX SYSTEM IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER
5578 080.76698 3,189
INSTALL 1,206 FEET OF 2 INCH POLY ALONG THE STREETS OF SUN CITY NH 80.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER
5579 080.76703 790,745
PURCHASE AND INSTALL NEW OFFICE FURNITURE, BUILDING SIGNAGE, BUILDING
FIRE ALARM SYSTEM, BUILDING ACCESS CONTROLS, BUILDING SURVEILLANCE
SYSTEM, IT/COMPUTER AND PHONE EQUIPMENT, AUDIO AND VISUAL
APPLICANCES FOR ROUNDROCK SERVICE CENTER, WILLIAMSON COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER
5580 080.76713 413,574
RELOCATE FACILITIES. INSTALL 119 FEET OF 2 INCH, 2,481 FEET OF 4 INCH POLY
AND ABANDON 1,267 FEET OF 3 INCH, 580 FEET OF 4 INCH POLY AND 133 FEET OF
2 INCH, 518 FEET OF 4 INCH STEEL IN CAMERON, MILAM COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY DECEMBER
5581 080.76714 58,525
ABANDON METER TUBE GAP CONTROLLERS AT GENERAL MOTORS ASSEMBLY
PLANT AND FOSTER FORBES LOCATIONS IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5582 080.76724 63,558
RELOCATE FACILITIES. INSTALL 177 FEET OF 2 INCH POLY ALONG FM 1417 TO
ACCOMMODATE TXDOT WIDENING PROJECT AND ABANDON 150 FEET OF 2 INCH
POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY DECEMBER
5583 080.76728 13,684
INSTALL 600 FEET OF 2 INCH ALONG DENTON COUNTY RIGHT OF WAY IN
UNINCORPORATED DENTON COUNTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL UNINCORPORATED GROWTH DECEMBER
5584 080.76731 528,905
INSTALL 2,675 FEET OF 2 INCH AND 80 FEET OF 8 INCH POLY ALONG STEPHANIE
DRIVE AND ABANDON 2,675 FEET OF 3 INCH AND 80 FEET OF 8 INCH STEEL IN
HALTOM CITY, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY DECEMBER
5585 080.76735 37,803 INSTALL 3,373 FEET OF 6 INCH POLY ALONG NORWICH STREET IN DALLAS.
COMMERCIAL OR
INDUSTRIAL DALLAS GROWTH DECEMBER
5586 080.76737 144,273
INSTALL 2,130 FEET OF 4 INCH AND 2,820 FEET OF 2 INCH POLY ALONG THE
STREETS OF STONE EAGLE SUBDIVISION IN AZLE. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL AZLE GROWTH DECEMBER
5587 080.76738 51,735
INSTALL 230 FEET OF 4 INCH POLY ALONG WHEELER AND ABANDON 210 FEET OF
4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY SEPTEMBER
5588 080.76752 63,303
INSTALL 130 FEET OF 4 INCH POLY ALONG NELSON AND ROBERTS AND ABANDON
125 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS BOWIE SYSTEM INTEGRITY DECEMBER
5589 080.76754 219,098
INSTALL 3,250 FEET OF 2 INCH POLY ALONG THE STREETS OF NORTH STAR
SUBDIVISION IN FORT WORTH, TARRANT COUNTY. RESIDENTIAL FORT WORTH GROWTH DECEMBER
5590 080.76763 79,161
INSTALL 3,591 FEET OF 2 INCH AND 1,740 FEET OF 4 INCH POLY ALONG THE
STREETS OF EMMANUAL LANE IN CELINA, COLLIN COUNTY. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH DECEMBER
5591 080.76765 21,612
INSTALL 1,185 FEET OF 2 INCH POLY ALONG SOUTH LOCKHART ROAD AND WEST
WASHINGTON STREET IN STEPHENVILLE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL STEPHENVILLE GROWTH SEPTEMBER
5592 080.76771 37,603
INSTALL 330 FEET OF 4 INCH POLY ALONG 4TH STREET SOUTHWEST AND
ABANDON 309 FEET OF 3 INCH STEEL, 17 FEET OF 3 INCH POLY IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY JULY
5593 080.76773 815,291
INSTALL REGULATOR STATION AND 700 FEET OF 8 INCH POLY AND RETIRE OLD
STATION ALONG NEW YORK AVE IN ARLINGTON, TARRANT COUNTY ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5594 080.76776 (5,609)
RELOCATE FACILITIES. INSTALL 122 FEET OF 6 INCH POLY ALONG MORNINGSTAR
BOULEVARD AND STELLAR WIND DIRVE AND ABANDON 55 FEET OF 6 INCH POLY ALL CUSTOMERS GEORGETOWN
RELOCATION OF
FACILITIES SEPTEMBER
5595 080.76778 100,630
RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH POLY ALONG TURTLE COVE
STREET IN ROCKWALL AND ABANDON 190 FEET OF 3 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY OCTOBER
5596 080.76780 50,505
INSTALL 10 FEET OF 4 INCH STEEL AND METER SET AND DISTRICT REGULATOR
STATION ALONG MARS DRIVE IN WOODWAY.
COMMERCIAL OR
INDUSTRIAL WOODWAY GROWTH DECEMBER
5597 080.76782 120,868 RELOCATE FACILITIES. INSTALL 950 FEET OF 4 INCH POLY TO ACCOMODATE CITY O ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER
5598 080.76783 9,599
INSTALL 700 FEET OF 4 INCH POLY ALONG MAIN STREET AND ABANDON 350 FEET
OF 2 INCH AND 350 FEET OF 1.25 INCH POLY IN LEWISVILLE. ALL CUSTOMERS LEWISVILLE
SYSTEM
IMPROVEMENT DECEMBER
5599 080.76788 24,697
INSTALL 687 FEET OF POLY ALONG THE STREETS OF BURLESON. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL BURLESON GROWTH SEPTEMBER
5600 080.76793 44,596
INSTALL 50 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 45 FEET
OF 2 INCH STEEL AND 5 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS YANTIS SYSTEM INTEGRITY DECEMBER
5601 080.76794 42,881
RELOCATE FACILITIES. INSTALL 330 FEET OF 6 INCH POLY ALONG LIVE OAK
STREET IN COMMERCE AND ABANDON 330 FEET OF 6 INCH STEEL. DEVELOPER
INSTALLED FACILITIES. ALL CUSTOMERS COMMERCE
RELOCATION OF
FACILITIES DECEMBER
5602 080.76799 688,985 INSTALL 965 FEET OF 2 INCH, 1,137 FEET OF 4 INCH AND ABANDON 424 FEET OF 3 IN ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY DECEMBER
5603 080.76806 27,028
INSTALL 200 FEET OF 2 INCH POLY ALONG THE STREETS OF INDUSTRIAL PARK
ALONG FM 1641.
COMMERCIAL OR
INDUSTRIAL TALTY GROWTH JUNE
5604 080.76808 (43,223)
RELOCATE FACILITIES. INSTALL 1,285 FEET OF 4 INCH AND 176 FEET OF 2 INCH
POLY ALONG BULLDOG STADIUM DRIVE AND THIRD STREET IN BURNET AND
ABANDON 850 FEET OF 4 INCH POLY. ALL CUSTOMERS BURNET
RELOCATION OF
FACILITIES DECEMBER
5605 080.76809 98,655
INSTALL 1,100 FEET OF 2 INCH POLY ALONG HARDIWICK PLACE IN ABILENE.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ABILENE GROWTH OCTOBER
5606 080.76813 197,994
INSTALL 5,000 FEET OF 2 INCH POLY ALONG THE STREETS OF WOODCREEK
SUBDIVISION IN FATE. RESIDENTIAL FATE GROWTH SEPTEMBER
5607 080.76814 564,806
RELOCATE FACILITIES. INSTALL 850 FEET OF 2 INCH AND 1,400 FEET OF 6 INCH
POLY ALONG MERRITT STREET IN RIVER OAKS AND ABANDON 1,400 FEET OF 2
INCH AND 575 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY DECEMBER
5608 080.76815 21,984 INSTALL 1,000 FEET OF 4 INCH POLY ALONG HARDWIC STREET IN ABILENE. ALL CUSTOMERS ABILENE GROWTH DECEMBER
MTX Additions
Page 160 of 178
379
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5609 080.76819 134,837
INSTALL 890 FEET OF 2 INCH POLY ALONG RITA AND CLIFF IN GARLAND AND
ABANDON 880 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5610 080.76823 66,272
INSTALL 150 FEET OF 6 INCH POLY AND 50 FEET OF 2 INCH POLY ALONG MILAM &
PRESTON STREETS AND ABANDON 150 FEET OF 6 INCH AND 50 FEET OF 2 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER
5611 080.76825 11,165 INSTALL 850 FEET OF 2 INCH POLY ALONG STREETS OF GRAND PRAIRIE.
COMMERCIAL OR
INDUSTRIAL GRAND PRAIRIE GROWTH SEPTEMBER
5612 080.76826 49,841
REPLACE OUTLET LEG OF DISTRICT REGULATOR STATION DFW#06. INSTALL 7
FEET OF 4 INCH STEEL AND ABANDON 7 FEET OF 2 INCH STEEL AT DFW AIRPORT
IN GRAPEVINE. ALL CUSTOMERS GRAPEVINE
SYSTEM
IMPROVEMENT DECEMBER
5613 080.76827 21,317
INSTALL 80 FEET OF 4 INCH POLY ALONG NORTH COLLLINS IN ARLINGTON,
TARRANT COUNTY.
COMMERCIAL OR
INDUSTRIAL ARLINGTON GROWTH DECEMBER
5614 080.76830 11,580
INSTALL 750 FEET OF 2 INCH POLY ALONG WALNUT LANE IN FORNEY. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORNEY GROWTH DECEMBER
5615 080.76831 456,746
INSTALL 160 FEET OF 12 INCH, 25 FEET OF 2 INCH AND 20 FEET OF 6 INCH POLY
ALONG HIGHWAY 277 AND ABANDON 150 FEET OF 10 INCH AND 15 FEET OF 6 INCH
STEEL AND 20 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
5616 080.76832 1,185,083
INSTALL ATLAS COMPOSITE WRAP TO RESTORE THE INTEGRITY OF LINE D-D9 IN
IRVING IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY OCTOBER
5617 080.76833 (137) ABANDON 273 FEET OF 12 INCH STEEL ALONG STREETS OF MELISSA. ALL CUSTOMERS MELISSA SYSTEM INTEGRITY AUGUST
5618 080.76835 580,374
INSTALL 2,550 FEET OF 4 INCH POLY ALONG THE STREETS OF DALLAS AND
ABANDON 2,350 FEET OF 4 INCH STEEL, 200 FEET OF 4 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5619 080.76841 234,921
INSTALL 50 FEET OF 2 INCH AND 1,515 FEET OF 4 INCH POLY ALONG NORTH
WASHINGTON STREET AND MAPLE STREET IN FARMERSVILLE, COLLIN COUNTY
AND ABANDON 1,350 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY DECEMBER
5620 080.76842 259,043
INSTALL 125 FEET OF 2 INCH AND 1,365 FEET OF 4 INCH POLY ALONG NORTH
WASHINGTON STREET AT HALE STREET IN FARMERSVILLE AND ABANDON 326
FEET OF 3 INCH POLY AND 1,094 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY DECEMBER
5621 080.76845 8,790
INSTALL 3,160 FEET OF 2 INCH POLY ALONG THE STREETS OF HOMESTEAD
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH JULY
5622 080.76846 (43,526)
INSTALL 755 FEET OF 6 INCH POLY ALONG HIGHWAY 281 IN MARBLE FALLS AND
ABANDON 854 FEET OF 6 INCH POLY. ALL CUSTOMERS MARBLE FALLS
RELOCATION OF
FACILITIES OCTOBER
5623 080.76847 82,883 INSTALL 860 FEET OF 6 INCH POLY ALONG HEMPHILL STREET.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH DECEMBER
5624 080.76848 49,299
INSTALL 5 FEET OF 8 INCH POLY ALONG GREAT OAKS DRIVE IN BRUSHY CREEK
AND ABANDON 8 FEET OF 8 INCH POLY. ALL CUSTOMERS BRUSHY CREEK SYSTEM INTEGRITY DECEMBER
5625 080.76857 78,401
INSTALL 900 FEET OF 4 INCH AND 2,840 FEET OF 2 INCH POLY ALONG THE STREET
OF ESPERANZA SUBDIVISION IN MESQUITE. DEVELPOER INSTALLED FACILITIES. RESIDENTIAL MESQUITE GROWTH DECEMBER
5626 080.76858 140,194
RELOCATE FACILITIES. INSTALL 355 FEET OF 6 INCH ALONG GREENVILLE
AVENUE IN ALLEN AND ABANDON 346 FEET OF 6 INCH POLY TO ACCOMMODATE
THE CITY OF ALLEN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ALLEN SYSTEM INTEGRITY DECEMBER
5627 080.76861 26,988
INSTALL 1,535 FEET OF 4 INCH AND 1,158 FEET OF 2 INCH POLY ALONG THE
STREETS OF SALERNO SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
5628 080.76862 138,847
INSTALL 200 FEET OF 12 INCH STEEL AND ABANDON 200 FEET OF 12 INCH STEEL
ALONG FM 1417 IN SHERMAN, GRAYSON COUNTY. ALL CUSTOMERS SHERMAN
RELOCATION OF
FACILITIES DECEMBER
5629 080.76864 792,872
INSTALL 4,095 FEET OF 4 INCH POLY ALONG BURLINGTON ROAD BETWEEN
MINTON ROAD AND EAST MCLEROY BOULEVARD IN SAGINAW AND ABANDON 3,920
FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY DECEMBER
5630 080.76867 128,736
INSTALL GROUNDBED ON L14-1(2ND) IN TEMPLE AND ABANDON GROUNDBED ON
L14-1(2ND) IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY OCTOBER
5631 080.76873 132,184
INSTALL 1,075 FEET OF 4 INCH POLY ALONG COLD SPRINGS ROAD TO
ACCOMODATE CITY OF FORT WORTH STREETS PROJECT AND ABANDON 827 FEET
OF 4 INCH STEEL AND 300 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
5632 080.76888 193,525 INSTALL 793 FEET OF 6 INCH, 61 FEET OF 4 INCH AND 145 FEET OF 2 INCH POLY ALO ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5633 080.76889 313,925
INSTALL 1,548 FEET OF 4 INCH POLY ALONG LOVERS LANE IN ARLINGTON,
TARRANT COUNTY AND ABANDON 1,550 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5634 080.76890 284,515
INSTALL 1,413 FEET OF 4 INCH POLY ALONG LOVERS LANE AND DANIEL DRIVE IN
ARLINGTON AND ABANDON 1,335 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5635 080.76891 296,354
INSTALL 1,357 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY ALONG LOVERS
LANE IN ARLINGTON AND ABANDON 1,350 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5636 080.76892 276,344
INSTALL 1,056 FEET OF 4 INCH AND 309 FEET OF 2 INCH POLY ALONG LOVERS
LANE IN ARLINGTON, TARRANT COUNTY AND ABANDON 1,050 FEET OF 4 INCH, 145
FEET OF 1.25 INCH STEEL AND 15 FEET OF 4 INCH, 20 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5637 080.76893 264,720
INSTALL 1,038 FEET OF 4 INCH AND 255 FEET OF 2 INCH POLY ALONG GLYNN
OAKS DRIVE IN ARLINGTON AND ABANDON 1,025 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5638 080.76894 310,407
INSTALL 1,360 FEET OF 4 INCH AND 11 FEET OF 2 INCH POLY ALONG GLYNN OAKS
DRIVE IN ARLINGTON, TARRANT COUNTY AND ABANDON 1.365 FEET OF 4 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5639 080.76895 171,231
INSTALL 1,502 FEET OF 2 INCH POLY AND ABANDON 625 FEET OF 4 INCH AND 220
FEET OF 2 INCH STEEL ALONG RAYBORN DRIVE IN ARLINGTON, TARRANT COUNTY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5640 080.76897 269,825
INSTALL 1,551 FEET OF 2 INCH POLY AND ABANDON IN 1,540 FEET OF 4 INCH
STEEL ALONG TUCKER BOULEVARD IN ARLINGTON, TARRANT COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5641 080.76898 311,020
INSTALL 1,533 FEET OF 4 INCH POLY AND ABANDON 1,510 FEET OF 4 INCH STEEL
ALONG GLYNN OAKS DRIVE IN ARLINGTON, TARRANT COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5642 080.76899 150,001
INSTALL 995 FEET OF 4 INCH 335 FEET OF 2 INCH POLY AND ABANDON 940 FEET
OF 4 INCH STEEL ALONG BROWNING DRIVE IN ARLINGTON, TARRANT COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
5643 080.76908 922,238
INSTALL 209 SUSL ALONG STREETS OF BURNETT AND ABANDON 209 SUSL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURNET SYSTEM INTEGRITY OCTOBER
5644 080.76912 512,806 RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH AND 1,275 FEET OF 6 INCH POL ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY DECEMBER
5645 080.76913 799,616 INSTALL 805 FEET OF 4 INCH, 3,070 FEET OF 2 INCH POLY ALONG HARLINGEN STRE ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5646 080.76915 736,908
RELOCATE FACILITIES. INSTALL 4,050 FEET OF 4 INCH POLY ALONG LONG
AVENUE TO ACCOMMODATE CITY OF RIVER OAKS STREET PROJECT AND
ABANDON 55 FEET OF 2 INCH, 355 FEET OF 3 INCH, AND 3,175 OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY DECEMBER
5647 080.76921 16,011
INSTALL 100 FEET OF 2 INCH POLY ALONG PINKSTON STREET IN THE CITY OF
TERRELL. RESIDENTIAL TERRELL GROWTH SEPTEMBER
5648 080.76922 36,827 INSTALL 75 FEET OF 2 INCH POLY ALONG THE STREETS OF ABILENE. RESIDENTIAL ABILENE GROWTH OCTOBER
5649 080.76924 39,009
INSTALL 1,550 FEET OF 6 INCH POLY ALONG BERKSHIRE LAKE BOULEVARD.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH OCTOBER
MTX Additions
Page 161 of 178
380
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5650 080.76925 150,886
INSTALL 550 FEET OF 4 INCH POLY ALONG BUTTERNUT STREET AND ABANDON
357 FEET OF 4 INCH STEEL AND 156 FEET OF 4 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
5651 080.76929 156,645
INSTALL 600 FEET OF 2 INCH POLY ALONG HATCH ROAD TO ACCOMODATE
TARRANT COUNTY STREET PROJECT AND ABANDON 603 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5652 080.76930 11,562
INSTALL 1,084 FEET OF 4 INCH AND 3,560 FEET OF 2 INCH POLY ALONG THE
STREETS OF ROENBUSCH RANCH SUBDIVISION IN LEANDER. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
5653 080.76931 7,604
INSTALL 982 FEET OF 2 INCH POLY ALONG THE STREETS OF PIONEER CROSSING
SUBDIVISION IN AUSTIN. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL AUSTIN GROWTH DECEMBER
5654 080.76932 73,231
INSTALL 900 FEET OF 6 INCH POLY ALONG NORTH STATE HIGHWAY 360 IN
MANSFIELD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MANSFIELD GROWTH OCTOBER
5655 080.76936 67,495
PURCHASE 24 VIVAX 560 LOCATOR KIT INCLUDING RECEIVER TRANSMITTER
LEADS FOR DIVISION WIDE EQUIPMENT PROJECT IN DALLAS. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT SEPTEMBER
5656 080.76937 102,971
RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY ALONG CHAFFIN DRIVE
IN RICHLAND HILLS AND ABANDON 385 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS SYSTEM INTEGRITY DECEMBER
5657 080.76946 6,326
INSTALL 450 FEET OF 4 INCH POLY ALONG NORTHGATE DRIVE. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL SHERMAN GROWTH SEPTEMBER
5658 080.76950 1,746 PURCHASE 1 NEW GAUGE ULTRASONIC THICKNESS TI-45N. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT JUNE
5659 080.76951 552,455
INSTALL 1,000 FEET OF 4 INCH POLY ALONG SHILOH ALLEY IN DALLAS AND
ABANDON 1,000 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5660 080.76957 265,958
INSTALL 1670 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY ALONG ROCKHILL
ROAD IN FRISCO, DENTON COUNTY. ALL CUSTOMERS FRISCO GROWTH DECEMBER
5661 080.76964 108,376
INSTALL 100 FEET OF 2 INCH POLY ALONG GLENVILLE DRIVE AND INTERNATIONAL
PARKWAY AND ABANDON 100 FEET OF 2 INCH POLY IN RICHARDSON, DALLAS
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY DECEMBER
5662 080.76965 222,885
RELOCATE FACILITIES. INSTALL 700 FEET OF 4 INCH POLY ALONG WEATHERRED
DRIVE IN RICHARDSON AND ABANDON 700 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY DECEMBER
5663 080.76967 227,217
INSTALL 1,290 FEET OF 4 INCH AND 3,095 FEET OF 2 INCH POLY ALONG THE
STREETS OF FERRIS SPRING SUBDIVISION IN FERRIS, ELLIS COUNTY.
DEVELOPER INSTALLED FACLITIES. RESIDENTIAL FERRIS GROWTH DECEMBER
5664 080.76968 16,556
INSTALL 285 FEET OF 2 INCH POLY ALONG THE STREETS OF MELISSA.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL MELISSA GROWTH DECEMBER
5665 080.76971 366,462
RELOCATE FACILITIES. INSTALL 1,215 FEET OF 4 INCH, AND 480 FEET OF 2 INCH
POLY TO ACCOMODATE CITY OF GRAPEVINE STREET PROJECT AND ABANDON 638
FEET OF 3 INCH, 2,748 FEET OF 4 INCH POLY IN GRAPEVINE, TARRANT COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER
5666 080.76974 7,792
INSTALL 300 FEET OF 4 INCH POLY NEAR THE INTERSECTION OF CEDAR VALLEY
AND MIDPOINT IN LANCASTER. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL LANCASTER GROWTH DECEMBER
5667 080.76975 351,964 RELOCATE FACILITIES. INSTALL 715 FEET OF 4 INCH AND 1,260 FEET OF 2 INCH POL ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY DECEMBER
5668 080.76978 178 RELOCATE FACILITIES INSTALL 950 FEET OF 4 INCH POLY ALONG THE STREETS OF ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY SEPTEMBER
5669 080.76983 524,254
INSTALL 1,600 FEET OF 6 INCH POLY AND ABANDON 1,600 FEET OF 6 INCH BARE
STEEL ALONG VAUGHN BOULEVARD IN FORT WORTH, TARRANT COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5670 080.76988 38,346
INSTALL 50 FEET OF 2 INCH POLY AND ABANDON 100 FEET OF 2 INCH STEEL AND
DISTRICT REGULATOR STATION #21 IN STAMFORD ALONG EAST VANDERBILT
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY SEPTEMBER
5671 080.76989 145,419
INSTALL 40 FEET OF 2 INCH POLY ALONG TOMIE STREET AND ABANDON 20 FEET
OF 2 IN POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS QUITMAN SYSTEM INTEGRITY SEPTEMBER
5672 080.76990 31,073 INSTALL 100 FEET OF 2 INCH POLY ALONG ISOM LANE IN DALLAS. RESIDENTIAL DESOTO GROWTH DECEMBER
5673 080.76992 66,737
INSTALL 200 FEET OF 6 INCH POLY ALONG HILLCREST ROAD AND OHIO DRIVE IN
FRISCO AND ABANDON 139 FEET OF 6 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO SYSTEM INTEGRITY DECEMBER
5674 080.76993 182,351 INSTALL 755 FEET OF 2 INCH POLY ALONG THE STREETS OF STEPHENVILLE AND AB ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY DECEMBER
5675 080.76998 1,451,928 INSTALL 1,335 FEET OF 2 INCH AND 3,270 FEET OF 4 INCH POLY ALONG FERGUSON ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5676 080.77000 91,824
INSTALL 850 FEET OF 2 INCH POLY ALONG OLD NOVICE ROAD IN PARIS AND
ABANDON 850 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY OCTOBER
5677 080.77006 315,183
PURCHASE 39 SENSIT TRAK-IT IIIA AND 115 SENSIT GOLD G2S CGIS THROUGHOUT
THE DIVISION. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT DECEMBER
5678 080.77007 127,201
INSTALL 3,500 FEET OF 2 INCH POLY ALONG THE STREETS OF HARVEST
SUBDIVISION IN NORTHLAKE. RESIDENTIAL NORTHLAKE GROWTH DECEMBER
5679 080.77009 60,234
INSTALL 1,400 FEET OF 2 INCH POLY ALONG THE STREETS OF HARVEST
SUBDIVISION IN NORTHLAKE. RESIDENTIAL NORTHLAKE GROWTH DECEMBER
5680 080.77011 26,147 INSTALL 110 FEET OF 4 INCH POLY ALONG EAST 23RD STREET IN BRYAN. RESIDENTIAL BRYAN GROWTH DECEMBER
5681 080.77012 327,241 INSTALL DISTRICT REGULATOR STATION #09 AND 110 OF 2 INCH, 10 FEET OF 4 INCH ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
5682 080.77016 224,396
INSTALL 4,900 FEET OF 2 INCH AND 550 FEET OF 4 INCH POLY ALONG THE
STREETS OF BEAR CREEK SUBDIVISION IN LAVON. RESIDENTIAL LAVON GROWTH SEPTEMBER
5683 080.77019 31,936
INSTALL 3,940 FEET OF 2 INCH POLY ALONG THE STREETS OF WESTLAKE
SUBDIVISION IN MCGREGOR. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WOODWAY GROWTH DECEMBER
5684 080.77025 10,926 INSTALL 75 FEET OF 2 INCH POLY ALONG REDWOOD CREEK DRIVE IN FAIRVIEW. RESIDENTIAL FAIRVIEW GROWTH OCTOBER
5685 080.77026 1,397
INSTALL 5 FEET OF 2 INCH POLY ALONG WAYSIDE IN PILOT POINT AND ABANDON
5 FEET OF 2 INCH POLY. ALL CUSTOMERS PILOT POINT
RELOCATION OF
FACILITIES JUNE
5686 080.77031 148,783
INSTALL 950 FEET OF 2 INCH POLY ALONG LEONA AVENUE IN DALLAS AND
ABANDON 950 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5687 080.77036 229,674
INSTALL 6,400 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKE BREEZE
ESTATES SUBDIVISION IN LAVON. RESIDENTIAL LAVON GROWTH OCTOBER
5688 080.77039 590,465
INSTALL 3,160 FEET OF 6 INCH POLY ALONG RAY DRIVE AND JUANITA DRIVE IN
DENISON AND ABANDON 3,320 FEET OF 2 INCH STEEL AND 99 FEET OF 2 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY DECEMBER
5689 080.77041 3,626
INSTALL 5 FEET OF 2 INCH POLY ALONG HOLIDAY STREET IN PILOT POINT AND
ABANDON 5 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PILOT POINT SYSTEM INTEGRITY JULY
5690 080.77042 248,101
INSTALL 1,290 FEET OF 6 INCH POLY ALONG MARY LAKE DRIVE IN BRYAN AND
ABANDON 1,290 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY DECEMBER
5691 080.77043 145,749
INSTALL DISTRICT REGULATOR STATION DRS01, 90 FEET OF 3 INCH AND 60 FEET
OF 4 INCH POLY AND ABANDON REGULATOR STATION, 60 FEET OF 3 INCH, 20 FEET
OF 2 INCH POLY AND 20 FEET OF 2 INCH, AND 20 FEET OF 4 INCH STEEL IN
OGLESBY, CORYELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS OGLESBY SYSTEM INTEGRITY DECEMBER
5692 080.77045 10,162
INSTALL 3,080 FEET OF 6 INCH POLY ALONG HARMONSON ROAD IN NORTHLAKE.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL NORTHLAKE GROWTH SEPTEMBER
5693 080.77046 194,555
INSTALL 1,050 FEET OF 2 INCH, 80 FEET OF 4 INCH POLY ALONG AVENUE A AND
AVENUE E IN ENNIS AND ABANDON 400 FEET OF 2 INCH STEEL AND 650 FEET OF 2
INCH, 80 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER
5694 080.77048 206,753
RELOCATE FACILITIES. INSTALL 860 FEET OF 4 INCH POLY ALONG SADDLE TRAIL
TO ACCOMMODATE TARRANT COUNTY STREET PROJECT AND ABANDON 842 FEET
OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 162 of 178
381
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5695 080.77049 326,040
INSTALL 910 FEET OF 2 INCH, 550 FEET OF 4 INCH POLY ALONG PIMLICO WAY AND
ABANDON 1,158 FEET OF 2 INCH, 200 FEET OF 3 INCH STEEL IN SAGINAW,
TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY DECEMBER
5696 080.77051 256,933
INSTALL 350 FEET OF 6 INCH AND 6,750 FEET OF 12 INCH STEEL ALONG HK
DODGEN LOOP IN TEMPLE AND ABANDON 6,700 FEET OF 6 INCH STEEL ALL CUSTOMERS TEMPLE
SYSTEM
IMPROVEMENT OCTOBER
5697 080.77054 164,288 INSTALL DISTRICT REGULATOR STATION #01, 50 FEET OF 2 INCH AND 25 FEET OF 4 ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY DECEMBER
5698 080.77055 17,725
RELOCATE FACILITIES. INSTALL 65 FEET OF 2 INCH POLY ALONG SOUTH WILSON
STREET AND ABANDON 280 FEET OF 4 INCH POLY TO ACCOMODATE THE CITY OF
BURLESON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY OCTOBER
5699 080.77057 25,203
MODIFY DISTRICT REGULATOR STATION DRS04 WITH A NEW RELIEF VALVE STACK.
ABANDON WORKER MONITOR SETUP AND INSTALL 2 INCH 289P RELIEF VALVE
WITH RELIEF VALVE SPOOL. ABANDON 2 INCH FISHER 243 MONITOR REGULATOR
IN BELMEADE, MCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELLMEAD SYSTEM INTEGRITY DECEMBER
5700 080.77058 174,585
INSTALL GARLAND DISTRICT REGULATOR STATION DRS11, 40 FEET OF 2 INCH, 30
FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS11, 40
FEET OF 2 INCH POLY, AND 25 FEET OF 4 INCH STEEL IN GARLAND, DALLAS
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5701 080.77062 136,960
INSTALL DISTRICT REGULATOR STATION DRS01 AND ABANDON DISTRICT
REGULATOR STATION DRS01 IN WHITNEY, HILL COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITNEY SYSTEM INTEGRITY DECEMBER
5702 080.77064 141,453 INSTALL DISTRICT REGULATOR STATION #05, 25 FEET OF 2 INCH AND 20 FEET OF 4 ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY DECEMBER
5703 080.77068 8,295
INSTALL 3,458 FEET OF 2 INCH POLY ALONG THE STREETS OF HORIZON LAKE
SUBDIVISION IN LEANDER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
5704 080.77069 106,872
INSTALL 310 FEET OF 6 INCH POLY ALONG WEST TRAVIS STREET AND 120 FEET
OF 2 INCH POLY ALONG NORTH MILAM STREET IN KERRVILLE AND ABANDON 290
FEET OF 6 INCH STEEL AND 120 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG SYSTEM INTEGRITY SEPTEMBER
5705 080.77070 86,240
INSTALL 290 FEET OF 2 INCH POLY ALONG WOODPARK LANE IN BEDFORD,
TARRANT COUNTY. RESIDENTIAL BEDFORD GROWTH DECEMBER
5706 080.77073 148,429 INSTALL DISTRICT REGULATOR STATION #17, 25 FEET OF 2 INCH AND 30 FEET OF 4 ALL CUSTOMERS SEAGOVILLE SYSTEM INTEGRITY DECEMBER
5707 080.77074 278,590
INSTALL 1,220 FEET OF 4 INCH AND 3,440 FEET OF 2 INCH POLY ALONG
SHEPPARDS LANE AND THUNDER DRIVE IN WAXAHACHIE. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL WAXAHACHIE GROWTH DECEMBER
5708 080.77078 312,637
RELOCATE FACILITIES. INSTALL 2,625 FEET OF 2 INCH POLY ALONG WILLIAM
SPRINGS ROAD IN LAKE WORTH TO ACCOMMODATE TARRANT COUNTY STREET
PROJECT AND ABANDON 2,908 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH SYSTEM INTEGRITY OCTOBER
5709 080.77080 72,933
INSTALL 440 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 440 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS BLANKET SYSTEM INTEGRITY SEPTEMBER
5710 080.77081 7,998
INSTALL 997 FEET OF 4 INCH AND 5,158 FEET OF 2 INCH POLY ALONG THE
STREETS OF BRIDGEHAVEN SUBDIVISION IN GEORGETOWN. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER
5711 080.77086 60,431
INSTALL 420 FEET OF 2 INCH POLY ALONG LAMAR STREET IN MERKEL AND
ABANDON 520 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MERKEL SYSTEM INTEGRITY SEPTEMBER
5712 080.77087 28,745
INSTALL 50 FEET OF POLY ALONG 30TH STREET IN SNYDER AND ABANDON 1.25
INCH SERVICE LINE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY JULY
5713 080.77091 219,576
INSTALL 720 FEET OF 4 INCH AND 230 FEET OF 2 INCH POLY ALONG EAST GRAND
IN COMANCHE AND ABANDON 229 FEET OF 2 INCH AND 510 FEET OF 4 INCH POLY
AND 524 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY DECEMBER
5714 080.77092 107,046
INSTALL 940 FEET OF 2 INCH POLY ALONG THE STREETS OF HAMPTON HILLS
SUBDIVISION IN ABILENE. RESIDENTIAL ABILENE GROWTH DECEMBER
5715 080.77093 22,222
INSTALL 100 FEET OF 2 INCH POLY ALONG LANSHIRE AND THUNDERBIRD LANE IN
DALLAS. RESIDENTIAL DALLAS GROWTH DECEMBER
5716 080.77094 35,929
INSTALL 100 FEET OF 2 INCH POLY ALONG STARKS AVENUE AND HAWN FREEWAY
SERVICE ROAD IN DALLAS. RESIDENTIAL DALLAS GROWTH DECEMBER
5717 080.77103 44,697
INSTALL 1,090 FEET OF 2 INCH POLY ALONG HOPKINS ROAD IN KRUM, DENTON
COUNTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL KRUM GROWTH DECEMBER
5718 080.77109 633,936
INSTALL 1,680 FEET OF 6 INCH AND 500 FEET OF 2 INCH POLY AND ABANDON 1,700
FEET OF 6 INCH, 500 FEET OF 4 INCH, 1,697 FEET OF 2 INCH STEEL AND 258 FEET
OF 2 INCH POLY ALONG THE STREETS OF COLLIER AND BOND AND RAY AND
JUANITA IN DENISON, GRAYSON COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY DECEMBER
5719 080.77110 111,689 INSTALL 35 FEET OF 2 INCH, 20 FEET OF 6 INCH, 35 FEET OF 4 INCH POLY AND DISTR ALL CUSTOMERS CISCO SYSTEM INTEGRITY SEPTEMBER
5720 080.77111 652,076
INSTALL 1,960 FEET OF 8 INCH POLY ALONG LEMMON AVENUE AND SHORECREST
IN DALLAS AND ABANDON 2,060 FEET OF 8 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5721 080.77113 227,337
INSTALL 1,300 FEET OF 2 INCH POLY ALONG FORD STREET ALLEY FROM EAST
AVENUE D TO CARVER STREET IN GARLAND AND ABANDON 630 FEET OF 4 INCH
STEEL AND 370 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5722 080.77114 230,004
INSTALL 1,650 FEET OF 2 INCH POLY ALONG CLARK STREET ALLEY FROM CARVER
DRIVE AND E. AVENUE D IN GARLAND AND ABANDON 1,080 FEET OF 4 INCH STEEL
AND 340 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5723 080.77119 54,605
INSTALL GROUNDBED AT U-88 IN SWEETWATER AND ABANDON GROUNDBED AT U-
88. ALL CUSTOMERS HASKELL SYSTEM INTEGRITY DECEMBER
5724 080.77120 64,033 INSTALL GROUNDBED AT KC17-4 IN SWEETWATER. ALL CUSTOMERS HASKELL PIPELINE INTEGRITY DECEMBER
5725 080.77132 17,861
INSTALL 330 FEET OF 2 INCH POLY ALONG NORTH BEACH STREET. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH DECEMBER
5726 080.77140 67,761
INSTALL 1,200 FEET OF 4 INCH AND 550 FEET OF 2 INCH POLY ALONG THE
STREETS OF GRAND PRAIRIE. ALL CUSTOMERS GRAND PRAIRIE GROWTH OCTOBER
5727 080.77153 365,351
INSTALL 4,050 FEET OF 4 INCH AND 3,750 FEET OF 2 INCH POLY ALONG THE
STREETS OF TRAILSTONE SUBDIVISION IN CADDO MILLS, HUNT COUNTY.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CADDO MILLS GROWTH DECEMBER
5728 080.77156 25,572
RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH POLY ALONG HACKAMORE
STREET IN WHITE SETTLEMENT AND ABANDON 15 FEET OF 2 INCH STEEL AND 115
FEET OF 2 INCH POLY. ALL CUSTOMERS WHITE SETTLEMENT
RELOCATION OF
FACILITIES SEPTEMBER
5729 080.77160 1,108,242
INSTALL 2,098 FEET OF 4 INCH, 6,793 FEET OF 8 INCH POLY ALONG COUNTY ROAD
994 AND STATE HIGHWAY 289 IN CELINA, COLLIN COUNTY. ALL CUSTOMERS CELINA GROWTH DECEMBER
5730 080.77166 10,038 INSTALL 550 FEET OF 2 INCH POLY ALONG ROOSEVELT STREET IN SAN ANGELO. RESIDENTIAL SAN ANGELO GROWTH DECEMBER
5731 080.77167 984,570
INSTALL 1,700 FEET OF 8 INCH POLY AND ABANDON 1,255 FEET OF 8 INCH STEEL
ALONG THE STREETS OF DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5732 080.77197 35,872
INSTALL 465 FEET OF 2 INCH POLY ALONG TOM CHANDLER DRIVE IN COLLEGE
STATION. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL COLLEGE STATION GROWTH OCTOBER
5733 080.77198 227,194
INSTALL DISTRICT REGULATOR STATION #01, 25 FEET OF 4 INCH POLY ALONG
WEST MARKET STREET AND 2ND STREET IN MABANK AND ABANDON DISTRICT
REGULATOR STATION #01, 27 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MABANK SYSTEM INTEGRITY DECEMBER
5734 080.77203 47,391
INSTALL 500 FEET OF 2 INCH POLY ALONG LBJ FREEWAY IN DALLAS. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL DALLAS GROWTH OCTOBER
5735 080.77208 152,326
RELOCATE FACILITIES. INSTALL 304 FEET OF 2 INCH POLY ALONG MAGNOLIA
PARK DRIVE IN RICHLAND HILLS AND ABANDON 292 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS SYSTEM INTEGRITY DECEMBER
5736 080.77215 11,199
INSTALL 1,215 FEET OF 2 INCH POLY ALONG THE STREETS OF WILLIAMS CREEK
SUBDIVISION IN COLLEGE STATION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER
MTX Additions
Page 163 of 178
382
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5737 080.77217 319,654
INSTALL 900 FEET OF 6 INCH, 20 FEET OF 4 INCH POLY ALONG TRAIL LAKE DRIVE
IN FORT WORTH AND ABANDON 900 FEET OF 6 INCH AND 650 FEET OF 2 INCH
STEEL AND 20 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5738 080.77218 354,136
INSTALL 1,600 FEET OF 4 INCH POLY ALONG WEST SPURGEON FROM TRAIL LAKE
DRIVE TO BILGADE AVENUE IN FORT WORTH AND ABANDON 1,600 FEET OF 4 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5739 080.77219 234,946 INSTALL 1,365 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY ALONG WEST SPURGEON ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5740 080.77220 172,222
INSTALL 1,050 FEET OF 2 INCH POLY ALONG SOUTH RIDGE TERRACE IN FORT
WORTH AND ABANDON 650 FEET OF 2 INCH POLY AND 400 FEET OF 2 INCH STEEL
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5741 080.77224 233,770 RELOCATE FACILITIES. INSTALL 1,600 FEET OF 2 INCH POLY ALONG LONG STREET ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY DECEMBER
5742 080.77227 206,228
INSTALL 5,960 FEET OF 2 INCH POLY ALONG THE STREETS OF TRAVIS RANCH
MARINA SUBDIVISION IN FORNEY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH DECEMBER
5743 080.77240 76,021 INSTALL 515 FEET OF 4 INCH POLY ALONG AT&T EXPRESSWAY IN ARLINGTON.
COMMERCIAL OR
INDUSTRIAL ARLINGTON GROWTH SEPTEMBER
5744 080.77250 33,376
INSTALL 886 FEET OF 2 INCH POLY ALONG THE STREETS OF RANCH PHASE
SUBDIVISION IN COLLEGE STATION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER
5745 080.77256 21,870 INSTALL 155 FEET OF 2 INCH POLY ALONG EAST BRADFORD STREET IN HEARNE. RESIDENTIAL HEARNE GROWTH SEPTEMBER
5746 080.77258 1,592 PURCHASE ONE (1) PRESSURE MODULE 100 PSI, .025 ACCY ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT JUNE
5747 080.77259 8,039
INSTALL 300 FEET OF 2 INCH POLY ALONG TEXOMA PARKWAY. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL DENISON GROWTH DECEMBER
5748 080.77263 293,665
INSTALL 1,560 FEET OF 2 INCH POLY ALONG CORNISH AVENUE IN FORT WORTH
AND ABANDON 1,560 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5749 080.77264 358,931
INSTALL 1,585 FEET OF 4 INCH POLY ALONG STAPLES AVENUE FROM SW LOOP
820 TO BILGLADE ROAD IN FORT WORTH AND ABANDON 1,585 FEET OF 2 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5750 080.77265 142,123
INSTALL 800 FEET OF 2 INCH POLY ALONG WILLOMET AVENUE IN FORT WORTH
AND ABANDON 700 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5751 080.77267 392,456
INSTALL 2,200 FEET OF 6 INCH AND 300 FEET OF 4 INCH POLY ALONG THE
STREETS OF FORT WORTH, TARRANT COUNTY AND ABANDON 900 FEET OF 4 INCH
AND 1,600 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5752 080.77268 51,546 INSTALL 410 FEET OF 2 INCH ALONG COVINGTON DRIVE IN WOODWAY. ALL CUSTOMERS WOODWAY GROWTH DECEMBER
5753 080.77276 32,930
INSTALL 536 FEET OF 6 INCH ALONG ALTA MESA BOULEVARD IN FORT WORTH.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH DECEMBER
5754 080.77282 88,427
INSTALL 450 FEET OF 4 INCH POLY ALONG WEST KING STREET IN BURLESON AND
ABANDON 260 FEET OF 4 INCH AND 150 FEET OF 2 INCH STEEL AND 50 FEET OF 4
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY SEPTEMBER
5755 080.77286 9,578
PURCHASE ONE ODOR HANDY PLUS WITH CALIBRATION KIT FOR CARROLLTON
SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT SEPTEMBER
5756 080.77288 5,978
INSTALL 220 FEET OF 2 INCH POLY ALONG ESTES PARKWAY SOUTH OF I-20
INTERSECTION IN LONGVIEW AND ABANDON 220 FEET OF 2 INCH STEEL. ALL CUSTOMERS LONGVIEW
RELOCATION OF
FACILITIES SEPTEMBER
5757 080.77291 303,137
INSTALL 775 FEET OF 4 INCH POLY ALONG 4TH STREET AND 350 FEET OF 2 INCH
POLY ALONG MARKET STREET IN HONEY GROVE AND ABANDON 770 FEET OF 4
INCH AND 345 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HONEY GROVE SYSTEM INTEGRITY DECEMBER
5758 080.77294 255,179
INSTALL 1,510 FEET OF 4 INCH AND 30 FEET OF 2 INCH POLY ALONG WEST
JEFFERSON BOULEVARD AND CALUMET AVENUE IN DALLAS AND ABANDON 1,505
FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5759 080.77296 263,463
INSTALL 1,660 FEET OF 2 INCH POLY AND ABANDON 1,195 FEET OF 4 INCH AND
1,695 FEET OF 2 INCH POLY ALONG VIA ESTRELLA AND VIA JAMES JACOB IN
DALLAS, DALLAD COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5760 080.77297 863,826
INSTALL 3,745 FEET OF 2 INCH POLY AND ABANDON 3,605 FEET OF 2 INCH STEEL,
50 FEET OF 4 INCH, 70 FEET OF 2 INCH, AND 90 FEET OF 1.25 FEET OF POLY
ALONG JEFFERSON BOULEVARD AND CALUMET AVENUE IN DALLAS, DALLAS
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5761 080.77302 6,605
INSTALL 1,131 FEET OF 2 INCH POLY ALONG THE STREETS OF FAIRWAYS AT
CRYSTAL FALLS IN LEANDER, WILLIAMSON COUNTY. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
5762 080.77303 5,014
INSTALL 1,662 FEET OF 2 INCH POLY ALONG THE STREETS OF FAIRWAYS
SUBDIVISION IN LEANDER. DEVELOPER INSTALLED FACILTIES. RESIDENTIAL LEANDER GROWTH DECEMBER
5763 080.77305 486,306 INSTALL 2,700 FEET OF 2 INCH POLY ALONG NE STREET AND NORTH ELM STREET IN ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5764 080.77309 16,110 INSTALL 115 FEET OF 4 INCH POLY ALONG CORPORATE DRIVE IN GAINESVILLE.
COMMERCIAL OR
INDUSTRIAL GAINESVILLE GROWTH OCTOBER
5765 080.77311 163,321
RELOCATE FACILITIES. INSTALL 1,650 FEET OF 2 INCH POLY ALONG SOUTHWEST
JOHNSON TO ACCOMMODATE CITY OF BURLESON STREET PROJECT AND
ABANDON 1,650 FEET OF 2 INCH POLY AND 270 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY DECEMBER
5766 080.77315 4,096 PURCHASE TWO (2) SENSITS TO BE USED BY C&M IN SOUTHEAST DALLAS AREA. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT JUNE
5767 080.77316 41,500
INSTALL 260 FEET OF 2 INCH ALONG DALE STREET AND CHOCTAW IN
STEPHENVILLE. ALL CUSTOMERS STEPHENVILLE GROWTH DECEMBER
5768 080.77319 208,446
RELOCATE FACILITIES. INSTALL 450 FEET OF 6 INCH POLY ALONG HERITAGE
TRACE PARKWAY AND ABANDON 450 FEET OF 6 INCH POLY TO ACCOMODATE THE
CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER
5769 080.77320 28,223
INSTALL 955 FEET OF 2 INCH POLY ALONG WHITE SETTLEMENT ROAD.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH DECEMBER
5770 080.77321 5,699
INSTALL 1,681 FEET OF 4 INCH AND 963 FEET OF 2 INCH POLY ALONG THE
STREETS OF CARNEROS RANCH SUBDIVISION IN LEANDER. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH OCTOBER
5771 080.77322 134,163
INSTALL 450 FEET OF 2 INCH POLY ALONG ENFIELD STREET IN BRYAN AND
ABANDON 450 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY DECEMBER
5772 080.77328 498,466
INSTALL 2,400 FEET OF 4 INCH AND 300 FEET OF 2 INCH POLY ALONG JEFFERSON
STREET IN SULPHUR SPRINGS AND ABANDON 190 FEET OF 4 INCH POLY, 285 FEET
OF 3 INCH, 1,900 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY DECEMBER
5773 080.77331 22,981
INSTALL 1,420 FEET OF 2 INCH POLY ALONG THE STREETS OF GREENBRIER
SUBDIVISION IN BRYAN. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH OCTOBER
5774 080.77333 10,111
PURCHASE AND INSTALL ICE MACHINE FOR GROESBECK SERVICE CENTER IN
GROESBECK, LIMESTONE COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER
5775 080.77337 1,545
INSTALL 160 FEET OF 2 INCH POLY IN EASEMENT SOUTH OF 121 IN PLANO.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL PLANO GROWTH SEPTEMBER
5776 080.77340 77,697
INSTALL 900 FEET OF 2 INCH POLY ALONG HAMPTON HILLS SUBDIVISION IN
ABILENE. ALL CUSTOMERS ABILENE GROWTH OCTOBER
5777 080.77341 221,281
INSTALL 1,500 FEET OF 2 INCH POLY ALONG WALDRON AVENUE AND BILGLADE
ROAD IN FORT WORTH AND ABANDON 1,425 FEET OF 2 INCH STEEL AND 75 FEET
OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5778 080.77343 46,719
INSTALL 4,250 FEET OF 2 INCH POLY ALONG THE STREETS OF WESTLAKE RANCH
SUBDIVISION IN WESTLAKE. RESIDENTIAL WESTLAKE GROWTH DECEMBER
MTX Additions
Page 164 of 178
383
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5779 080.77348 138,965
INSTALL 900 FEET OF 2 INCH POLY ALONG LOWELL LANE IN FORT WORTH AND
ABANDON 900 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5780 080.77351 71,500
ISNTALL 250 FEET OF 4 INCH POLY ALONG NOLAN RIDGE DRIVE IN CLEBURNE
AND ABANDON 250 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY DECEMBER
5781 080.77352 11,532
INSTALL RELIEF VALVE ON POTTSBORO CITY GATE AND ABANDON RELIEF VALVE
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS POTTSBORO SYSTEM INTEGRITY OCTOBER
5782 080.77354 23,179
INSTALL 225 FEET OF 4 INCH AND 900 FEET OF 2 INCH POLY ALONG HIGHWAY 67
IN SAN ANGELO.
COMMERCIAL OR
INDUSTRIAL SAN ANGELO GROWTH DECEMBER
5783 080.77357 236,189
INSTALL 900 FEET OF 4 INCH AND 320 FEET OF 2 INCH POLY ALONG STAPLES
AVENUE FROM BILGLADE ROAD TO LOWELL LANE AND ABANDON 900 FEET OF 2
INCH POLY AND 250 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5784 080.77360 34,793 INSTALL 230 FEET OF 2 INCH POLY ALONG THE STREETS OF ABILENE.
COMMERCIAL OR
INDUSTRIAL ABILENE GROWTH DECEMBER
5785 080.77363 19,635
INSTALL 80 FEET OF 4 INCH POLY ANLONG EAST JACK STREET BETWEEN
ANDERSON STREET AND SOUTH GALVESTON STREET IN BREMOND IN
ACCORDANCE WITH THE RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS BREMOND GROWTH SEPTEMBER
5786 080.77367 30,239
INSTALL 75 FEET OF 4 INCH POLY ALONG MONTAGUE ROAD AT LOVERS LANE IN
BOWIE. RESIDENTIAL BOWIE GROWTH DECEMBER
5787 080.77369 181,549
INSTALL 2,700 FEET OF 4 INCH, 2,000 FEET OF 2 INCH POLY ALONG THE STREETS
OF OVERLAND GROVE SUBDIVISION IN FORNEY. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL FORNEY GROWTH DECEMBER
5788 080.77381 11,118
INSTALL 175 FEET OF 2 INCH POLY ALONG SUNSET ROAD IN ROBINSON.
DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROBINSON GROWTH SEPTEMBER
5789 080.77383 963,540
INSTALL 30 FEET OF 20 INCH STEEL ON LINE D IN DALLAS AND ABANDON 30 FEET
OF 20 INCH STEEL. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5790 080.77384 317,390
INSTALL 3,128 FEET OF 2 INCH POLY ALONG FM 2208 IN LONGVIEW AND ABANDON
3,128 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY OCTOBER
5791 080.77387 (18,057)
RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH POLY AND ABANDON 400
FEET OF 2 INCH POLY EAST OF AVE K AND NORTH OF SPRING CREEK PARKWAY IN
PLANO, COLLIN COUNTY. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES DECEMBER
5792 080.77389 35,699
INSTALL 80 FEET OF 4 INCH, 90 FEET OF 2 INCH POLY ALONG INTERSECTION OF
RIDGE ROAD AND HIDDEN VALLEY IN ROCKWALL AND ABANDON 70 FEET OF 4
INCH AND 80 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY DECEMBER
5793 080.77392 21,739
INSTALL 900 FEET OF 4 INCH POLY ALONG ROAD TO SIX FLAGS IN ARLINGTON,
TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL ARLINGTON GROWTH DECEMBER
5794 080.77393 8,219
INSTALL 1,400 FEET OF 4 INCH POLY ALONG BRIERCROFT COURT IN
CARROLLTON. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL CARROLLTON GROWTH SEPTEMBER
5795 080.77394 565,569 RELOCATE FACILITIES. INSTALL 2,530 FEET OF 4 INCH AND 500 FEET OF 2 INCH PO ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5796 080.77395 672,725
INSTALL 4,410 FEET OF 4 INCH AND 4,745 FEET OF 2 INCH POLY ALONG THE
STREETS OF HERITAGE VILLAGE SUBDIVISION IN HALTOM CITY, TARRANT
COUNTY. RESIDENTIAL HALTOM CITY GROWTH DECEMBER
5797 080.77396 333,234
INSTALL 50 FEET OF 8 INCH STEEL ALONG GREAT SOUTHWEST PARKWAY IN
GRAND PRAIRIE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY DECEMBER
5798 080.77398 7,119
INSTALL 750 FEET OF 2 INCH POLY ALONG THE STREETS OF NORTH RICHLAND
HILLS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL NORTH RICHLAND HILLS GROWTH DECEMBER
5799 080.77399 27,526 INSTALL 130 FEET OF 2 INCH POLY ALONG SKYE LANE NEAR ALEX IN MIDLOTHIAN. RESIDENTIAL MIDLOTHIAN GROWTH DECEMBER
5800 080.77400 4,519
INSTALL 5,260 FEET OF 2 INCH POLY ALONG THE STREETS OF WOLF RANCH
SUBDIVISION IN GEORGETOWN, WILLIAMSON COUNTY. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER
5801 080.77401 1,212,346 INSTALL 1,625 FEET OF 4 INCH, 3,245 FEET OF 2 INCH POLY ALONG TUMALO TRAIL A ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5802 080.77404 3,618
INSTALL 395 FEET OF 2 INCH POLY ALONG THE STREETS OF TRAVISSO
SUBDIVISION IN LEANDER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
5803 080.77407 20,518
INSTALL 2,086 FEET OF 2 INCH POLY ALONG THE STREETS OF SALERNO
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH SEPTEMBER
5804 080.77414 527,708
INSTALL 610 FEET OF 2 INCH, 1,475 FEET OF 6 INCH POLY ALONG JEFFERSON AND
PATTERSON AND ABANDON 989 FEET OF 1.25 INCH, 452 FEET OF 2 INCH, 1,473
FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY DECEMBER
5805 080.77415 1,628
PURCHASE ONE NEW MARKER BALL LOCATOR FOR MCKINNEY SERVICE CENTER,
MCKINNEY, COLLIN COUNTY. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT DECEMBER
5806 080.77422 196,094
INSTALL 2,000 FEET OF 2 INCH POLY ALONG 2ND STREET FROM AVENUE A TO
AVENUE E IN ENNIS AND ABANDON 2,000 OF 2 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER
5807 080.77424 22,952
INSTALL 370 FEET OF 2 INCH POLY ALONG THE STREETS OF SAN ANGELO AND
ABANDON 250 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY OCTOBER
5808 080.77426 251,397 PURCHASE COMPUTER EQUIPMENT RELATED TO RETURN TO WORK IN DALLAS. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT DECEMBER
5809 080.77427 60,548
INSTALL 80 FEET OF 4 INCH POLY ALONG BLUEBONNET HILLS AND AUSTIN DRIVE
IN ENNIS AND ABANDON 80 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER
5810 080.77428 421,779
INSTALL 2,321 FEET OF 2 INCH POLY AND ABANDON 884 FEET OF 2 INCH, 420 FEET
OF 1.25 FEET STEEL AND 280 FEET OF 2 INCH AND 20 FEET OF 1.25 FEET POLY
ALONG GILMER STREET, ROSS STREET AND 2ND STREET IN KERRVILLE, KERR
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY DECEMBER
5811 080.77429 1,015,453 INSTALL 785 FEET OF 4 INCH, 3,115 FEET OF 2 INCH POLY ALONG INSERSOLL STREE ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5812 080.77430 314,048
INSTALL 800 FEET OF 6 INCH POLY ALONG SPRING CREEK PARKWAY IN PLANO
AND ABANDON 800 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER
5813 080.77431 31,139
INSTALL 500 FEET OF 2 INCH POLY ALONG RUSH CREEK DRIVE IN ARLINGTON,
TARRANT COUNTY. RESIDENTIAL ARLINGTON GROWTH DECEMBER
5814 080.77432 399,396
INSTALL 1,400 FEET OF 4 INCH AND 1,940 FEET OF 2 INCH POLY AND ABANDON
1,985 FEET OF 6 INCH, 1.045 FEET OF 3 INCH, AND 10 FEET OF 2 INCH STEEL AND
290 FEET OF 3 INCH, 10 FEET OF 2 INCH POLY ALONG CLYMER STREET AND
NOMAS STREET IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5815 080.77434 225,909
INSTALL 3,205 FEET OF 2 INCH POLY AND ABANDON 1.034 FEET OF 3 INCH, 572
FEET OF 2 INCH STEEL AND 17 FEET OF 4 INCH, 18 FEET OF 3 INCH, 393 FEET OF 2
INCH AND 225 FEET OF 1.25 INCH POLY ALONG NORTH STREET, GILMER STREET,
ROSS STREET AND 1ST STREET IN KERR, KERRVILLE COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY DECEMBER
5816 080.77435 553,315
INSTALL 2,020 FEET OF 6 INCH, 220 FEET OF 4 INCH, AND 290 FEET OF 2 INCH POLY
AND ABANDON 1,520 FEET OF 6 INCH, 745 FEET OF 4 INCH, 275 FEET OF 2 INCH
STEEL AND 60 FEET OF 6 INCH, 35 FEET OF 3 INCH, AND 60 FEET OF 2 INCH POLY
ALONG SINGLEON BOULEVARD AND BERNAL DRIVE IN DALLAS, DALLAS COUNTY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5817 080.77441 38,258
RELOCATE FACILITIES. INSTALL 130 FEET OF 4 INCH POLY ALONG SOUTH 5TH
STREET AT THE INTERSECTION OF AZALEA DRIVE IN TEMPLE AND ABANDON 130
FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY SEPTEMBER
5818 080.77445 277,093
INSTALL 1,900 FEET OF 4 INCH POLY ALONG LAKE HAVASU TRAIL IN FORT WORTH
AND ABANDON 1,375 FEET OF 4 INCH POLY AND 525 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
MTX Additions
Page 165 of 178
384
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5819 080.77448 372,467
INSTALL 1,100 FEET OF 2 INCH, 900 FEET OF 4 INCH POLY ALONG OAKLAND
BOULEVARD AND BRIDGE STREET AND ABANDON 900 FEET OF 4 INCH, 900 FEET
OF 2 INCH STEEL AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5820 080.77451 7,239 PURCHASE THREE (3) NEW SENSIT GOLD CGI'S. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT JUNE
5821 080.77452 4,108
INSTALL 85 FEET OF 2 INCH POLY ON AUSTIN AT 15TH STREET IN WICHITA FALLS
AND ABANDON 75 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
5822 080.77456 47,656
INSTALL 322 FEET OF 2 INCH STEEL ALONG WEST 14TH STREET AND ABANDON
322 FEET OF 2 INCH STEELIN BRYAN, BRAZOS COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY DECEMBER
5823 080.77459 179,398
INSTALL 1,560 FEET OF 2 INCH POLY ALONG ANTHONY AND BURNETT IN ENNIS
AND ABANDON 920 FEET OF 2 INCH STEEL, 200 FEET OF 1.25 INCH, 170 FEET OF 2
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER
5824 080.77461 185,716
INSTALL 270 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION DRS28
AND ABANDON 60 FEET OF 2 INCH AND 5 FEET OF 3 INCH AND 160 FEET OF 4 INCH
STEEL AND DISTRICT REGULATOR STATION DRS28 ALONG THE STREETS OF
ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
5825 080.77463 50,956
INSTALL 241 FEET OF 2 INCH POLY ALONG BOB WAY AND CREECHVILLE ROAD IN
ENNIS AND ABANDON 241 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER
5826 080.77467 76,204 INSTALL 725 FEET 0F 4 INCH ALONG WASHINGTON DRIVE IN MELISSA. ALL CUSTOMERS MELISSA GROWTH DECEMBER
5827 080.77470 178,951 INSTALL 750 FEET OF 4 INCH POLY ALONG SIERRA STREET IN MESQUITE. ALL CUSTOMERS MESQUITE GROWTH DECEMBER
5828 080.77474 47,753
INSTALL 275 FEET OF 2 INCH POLY ALONG CROCKETT IN CARROLLTON AND
ABANDON 275 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY SEPTEMBER
5829 080.77478 108,884
INSTALL 750 FEET OF 6 INCH AND 10 FEET OF 4 INCH POLY ALONG COUNTY ROAD
422/LEONARD DRIVE IN ANNA. ALL CUSTOMERS ANNA GROWTH DECEMBER
5830 080.77487 15,100 PURCHASE AND INSTALL NEW AIR CONDITION UNIT AT PARIS SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JULY
5831 080.77490 36,648 INSTALL 186 FEET OF 2 INCH POLY ALONG FOGG STREET IN FORT WORTH. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER
5832 080.77497 792,720
INSTALL 3,500 FEET OF 12 INCH POLY ALONG THE STREETS OF RIDGE PARK
ESTATES SUBDIVISION IN ROYSE CITY, ROCKWALL COUNTY. DEVELOPER
INSTALLED FACILITIES. ALL CUSTOMERS ROYSE CITY GROWTH DECEMBER
5833 080.77498 5,017
INSTALL 900 FEET OF 4 INCH POLY ALONG THE STREETS OF DFW AIRPORT IN
EULESS, DALLAS COUNTY.
COMMERCIAL OR
INDUSTRIAL EULESS GROWTH DECEMBER
5834 080.77501 1,336,856
ADD CNG STATION INSTALLATIONS TO THE FORT WORTH SERVICE CENTER, FORT
WORTH, TARRANT COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER
5835 080.77505 96,345
INTALL 24 .75 INCH POLY SERVICE LINES ALONG BRENTWOOD LANE IN FARMERS
BRANCH AND ABANDON 25 .75 INCH SERVICE LINES IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY DECEMBER
5836 080.77506 618,726
RELOCATE FACILITIES. INSTALL 3,300 FEET OF 4 INCH POLY ALONG STREETS OF
WHITE SETTLEMENT, TARRANT COUNTY AND ABANDON 720 FEET OF 2 INCH POLY,
400 FEET OF 2 INCH AND 1,860 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT SYSTEM INTEGRITY DECEMBER
5837 080.77517 106,959 RELOCATE FACILITIES. INSTALL 787 FEET OF 2 INCH POLY ALONG FERNHEATH LANE ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY DECEMBER
5838 080.77519 291,488
INSTALL 1,500 FEET OF 2 INCH POLY ALONG LA SOBRINA IN DALLAS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5839 080.77520 505,357
INSTALL 500 FEET OF 4 INCH AND 3,500 FEET OF 2 INCH POLY ALONG BERGEN
PLACE AND HEARTLESS PLACE IN FARMERS BRANCH, DALLAS COUNTY AND
ABANDON 500 FEET OF 4 INCH, AND 3,500 FEET OF 2 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY DECEMBER
5840 080.77521 524,542
INSTALL DISTRICT REGULATOR STATION #03 AND 975 FEET OF 4 INCH, 40 FEET OF
2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION #03 AND 430 FEET OF
3 INCH STEEL AND 1,200 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL SYSTEM INTEGRITY DECEMBER
5841 080.77523 66,726 INSTALL 850 FEET OF 4 INCH POLY ALONG BELTLINE ROAD IN GRAND PRAIRIE. ALL CUSTOMERS GRAND PRAIRIE GROWTH DECEMBER
5842 080.77526 7,263
INSTALL 305 FEET OF 4 INCH, 3,073 FEET OF 2 INCH POLY ALONG THE STREETS OF
BERRY CREEK HIGHLANDS SUBDIVISION IN GEORGETOWN, WILLIAMSON COUNTY.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER
5843 080.77532 387,650
INSTALL 1,300 FEET OF 4 INCH, 600 FEET OF 2 INCH POLY ALONG ST LAWRENCE
IN FORT WORTH AND ABANDON 1,150 FEET OF 4 INCH, 600 FEET OF 2 INCH STEEL
AND 150 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5844 080.77533 322,862
INSTALL 1,300 FEET OF 4 INCH AND 120 FEET OF 2 INCH POLY AND ABANDON 1,300
FEET OF 4 INCH STEEL ALONG ST. LAWRENCE ROAD IN FORT WORTH, TARRANT
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5845 080.77534 51,768
INSTALL CATHODIC PROTECTION TEST POINTS ON LINE CA 2ND WEST AND CA
3RD. ALL CUSTOMERS AZLE SYSTEM INTEGRITY SEPTEMBER
5846 080.77540 266,735
INSTALL 5 FEET OF A COMPOSITE ENCIRCLEMENT SLEEVE ALONG LINE D IN
DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
5847 080.77544 27,223
INSTALL 2,800 FEET OF 6 INCH POLY ALONG OAK GROVE ROAD IN FORT WORTH.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH DECEMBER
5848 080.77545 203,779
INSTALL 1,120 FEET OF 4 INCH POLY ALONG CAMELOT ROAD AT ALTAMESA
BOULEVARD IN FORT WORTH AND ABANDON 730 FEET OF 2 INCH AND 70 FEET OF
4 INCH POLY. ALL CUSTOMERS FORT WORTH
SYSTEM
IMPROVEMENT DECEMBER
5849 080.77546 40,175 INSTALL 242 FEET OF 6 INCH POLY ALONG COIT ROAD IN FRISCO. ALL CUSTOMERS FRISCO GROWTH SEPTEMBER
5850 080.77548 275,350
INSTALL DISTRICT REGULATOR STATION #04 ALONG BELTLINE ROAD AND
MERRIFIELD DRIVE IN CEDAR HILL AND ABANDON DISTRICT REGULATOR
STATION#04 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CEDAR HILL SYSTEM INTEGRITY DECEMBER
5851 080.77551 25,709 INSTALL 100 FEET OF 2 INCH POLY ALONG LEDBETTER ROAD IN ARLINGTON. RESIDENTIAL ARLINGTON GROWTH OCTOBER
5852 080.77552 260,763
INSTALL 1,405 FEET OF 2 INCH ALONG WESTMINISTER STREET IN KERRVILLE AND
ABANDON 642 FEET OF 2 INCH POLY AND 692 FEET OF STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY DECEMBER
5853 080.77556 159,189
INSTALL 555 FEET OF 2 INCH POLY AND ABANDON 250 FEET OF 2 INCH STEEL AND
315 FEET OF 3 INCH POLY ALONG CHERRYWOOD LANE IN DENTON, DENTON
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER
5854 080.77565 3,693
INSTALL 832 FEET OF 6 INCH AND 229 FEET OF 2 INCH POLY ALONG THE STREETS
OF BERRY CREEK SUBDIVISION IN GEORGETOWN, WILLIAMSON COUNTY.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER
5855 080.77566 325,654
INSTALL 4,971 FEET OF 2 INCH AND 570 FEET OF 6 INCH POLY ALONG THE
STREETS OF SANDBROCK RANCH SUBDIVISION IN AUBREY, DENTON COUNTY. RESIDENTIAL AUBREY GROWTH DECEMBER
5856 080.77570 763,331
INSTALL 150 SERVICE LINES ALONG THE STREETS OF DUNCANVILLE (MAPSHEET
#039) IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY DECEMBER
5857 080.77577 41,520
RELOCATE FACILITIES. INSTALL 60 FEET OF 2 INCH POLY ALONG MISSION RIDGE
ROAD IN PLANO AND ABANDON 60 FEET OF 2 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY DECEMBER
5858 080.77589 5,360
INSTALL 1,300 FEET OF 2 INCH POLY ALONG THE STREETS OF MANSFIELD.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL MANSFIELD GROWTH OCTOBER
5859 080.77594 82,503
INSTALL 3 INCH PLUG VALVE, 8 INCH STOPPLE, 3 INCH STOPPLE AND 2 INCH
T.O.R. AND ABANDON NON-OPERABLE 3 INCH PLUG AT RESTLAND STATION ON
LINE D IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
MTX Additions
Page 166 of 178
385
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5860 080.77595 328,812
INSTALL 1,730 FEET OF 4 INCH, 50 FEET OF 2 INCH POLY ALONG RICHLAND DRIVE
IN WACO, MCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
5861 080.77596 484,014
INSTALL 1,700 FEET OF 4 INCH, 360 FEET OF 2 INCH POLY AND ABANDON 1,500
FEET OF 4 INCH AND 60 FEET OF 2 INCH STEEL AND 200 FEET OF 2 INCH AND 300
FEET OF 4 INCH POLY ALONG CANDLEWOOD ROAD IN FORT WORTH, TARRANT
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5862 080.77598 182,567
INSTALL 400 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #01
ALONG 5TH STREET IN FORRESTON AND ABANDON 250 FEET OF 2 INCH STEEL
AND DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORRESTON SYSTEM INTEGRITY OCTOBER
5863 080.77605 11,027
INSTALL 720 FEET OF 4 INCH AND 2,870 FEET OF 2 INCH POLY ALONG THE
STREETS OF WOODBRIDGE TOWNHOMES IN WYLIE. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL WYLIE GROWTH DECEMBER
5864 080.77608 12,443 REPLACEMENT DPIR FOR WICHITA FALLS COMPLIANCE. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT JULY
5865 080.77610 543,491
INSTALL 4,800 FEET OF 2 INCH AND 2,400 FEET OF 4 INCH POLY NEAR THE
INTERSECTION OF SHELBY AND SHANE OF LAKES AND PARKS OF SOMERCREST
SUBDIVISION IN MIDLOTHIAN. RESIDENTIAL MIDLOTHIAN GROWTH OCTOBER
5866 080.77615 177,307
INSTALL 76 FEET OF 8 INCH AND 110 FEET OF 3 INCH POLY AND ABANDON 76
FEET OF 16 INCH STEEL ALONG RECORD CROSSING AND SLEEPY HOLLOW IN
DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5867 080.77616 536,756 INSTALL DISTRICT REGULATOR STATION #01 AND 1,700 FEET OF 4 INCH POLY ALON ALL CUSTOMERS HUTCHINS SYSTEM INTEGRITY DECEMBER
5868 080.77619 12,638
INSTALL 426 FEET OF 4 INCH AND 5,738 FEET OF 2 INCH POLY ALONG THE
STREETS OF BLUFFVIEW SUBDIVISION IN LEANDER, WILLIAMSON COUNTY.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
5869 080.77621 23,828
INSTALL 1,800 FEET OF 2 INCH POLY ALONG THE STREETS OF SOUTHLAND HILLS
SUBDIVISION IN SAN ANGELO. RESIDENTIAL SAN ANGELO GROWTH DECEMBER
5870 080.77633 10,838
PURCHASE TWO (2) ELECTROFUSION PROCESSORS FOR C & M SOUTH REGION
DALLAS, DALLAS COUNTY. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT DECEMBER
5871 080.77634 11,434
INSTALL 2 GROVE PILOTS AND 2 MOONEY PILOTS ALONG FM 1082 AND LINE WA
JUNCTION FOR ABILENE PRISON AND ABANDON 2 GROVE PILOTS AND 2 MOONEY
PILOTS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
5872 080.77637 8,913
INSTALL 25 FEET OF 4 INCH POLY ALONG PRESTON STREET IN DALLAS AND
ABANDON 17 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY SEPTEMBER
5873 080.77643 15,514
REPLACEMENT OF OLD R-22 LENNOX 3-PHASE SYSTEM (HIGH EFFICIENCY GAS
FURNACE) IN BELL. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER
5874 080.77647 3,612
PURCHASE ONE (1) MERIAN DIFFERENTIAL METER FOR COMPLIANCE GROUP
SOUTH DALLAS REGION, DALLAS COUNTY. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT OCTOBER
5875 080.77648 107,606
INSTALL DISTRICT REGULATOR STATION #14 ALONG AVENUE G AND 18TH STREET
IN CISCO AND ABANDON DISTRICT REGULATOR STATION #14 IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY DECEMBER
5876 080.77650 52,958
INSTALL 2,238 FEET OF 2 INCH POLY ALONG SOUTHERN POINT SUBDIVISION IN
COLLEGE STATION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER
5877 080.77664 245,864
INSTALL 1,460 FEET OF 6 INCH POLY ALONG MAYFIELD ROAD AND STATE
HIGHWAY 161 SERVICE ROAD IN GRAND PRAIRIE. ALL CUSTOMERS GRAND PRAIRIE GROWTH DECEMBER
5878 080.77665 23,229
INSTALL 1,330 FEET OF 2 INCH POLY ALONG THE STREETS OF MORNINGSTAR
SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
5879 080.77669 309,297
INSTALL 184 FEET OF 12 INCH STEEL AND ABANDON 132 FEET OF 8 INCH STEEL
ALONG THE STREETS OF UNIVERSITY OF TEXAS-DALLAS, RICHARDSON, DALLAS
COUNTY. ALL CUSTOMERS RICHARDSON
RELOCATION OF
FACILITIES DECEMBER
5880 080.77670 376,739
INSTALL 1,200 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #01
ALONG LITTLE STREET AND 1ST STREET IN WILMER AND ABANDON 1,500 FEET OF
3 INCH POLY AND 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WILMER SYSTEM INTEGRITY DECEMBER
5881 080.77673 219,577
RELOCATE FACILITIES. INSTALL 913 FEET OF 6 INCH AND 224 FEET OF 2 INCH
POLY ALONG WESTMORELAND ROAD AND EAGLE DRIVE AND ABANDON 893 FEET
OF 6 INCH AND 174 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO SYSTEM INTEGRITY DECEMBER
5882 080.77674 222,246
INSTALL 1,050 FEET OF 4 INCH, 200 FEET OF 2 INCH POLY ALONG CARVER DRIVE
FROM HOPKINS STREET TO FORD STREET ALLEY IN GARLAND AND ABANDON
1,300 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5883 080.77675 194,215
INSTALL 970 FEET OF 4 INCH POLY ALONG EAST AVENUE EAST FROM HOPKINS
STREET TO SOUTH 1ST STREET IN GARLAND AND ABANDON 840 FEET OF 2 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5884 080.77686 9,322
INSTALL 276 FEET OF 2 INCH POLY ALONG WRIGHT STREET IN CALDWELL.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL CALDWELL GROWTH OCTOBER
5885 080.77687 26,501
INSTALL 1,800 FEET OF 2 INCH POLY ALONG THE STREETS OF AUSTIN COLONY
SUBDIVISION IN BRYAN. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH DECEMBER
5886 080.77688 46,010
INSTALL 465 FEET OF 2 INCH POLY ALONG LEGION DRIVE AND MAIN STREET IN
KERRVILLE.
COMMERCIAL OR
INDUSTRIAL KERRVILLE GROWTH OCTOBER
5887 080.77689 293,253
INSTALL 1.350 FEET OF 2 INCH POLY AND ABANDON 1,350 FEET OF 2 INCH STEEL
ALONG CORDELL STREET AND WESTCHESTER STREET IN DENTON, DENTON
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER
5888 080.77690 13,268
INSTALL 560 FEET OF 6 INCH POLY ALONG SOUTHPORT PARKWAY IN HUTCHINS,
DALLAS COUNTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL WILMER GROWTH DECEMBER
5889 080.77692 182,028
INSTALL 800 FEET OF 2 INCH POLY ALONG GLENBROOK COURT IN GARLAND AND
ABANDON 800 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5890 080.77693 2,236,921
INSTALL 24 INCH ACTUATED VALVE ALONG THE STREETS OF GARLAND AND
ABANDON 24 INCH VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY DECEMBER
5891 080.77694 299,050
INSTALL 1,400 FEET OF 2 INCH POLY ALONG WILDGROVE DRIVE FROM SOUTH
GLENBROOK DRIVE TO SHIRLEY DRIVE IN GARLAND AND ABANDON 1,350 FEET OF
2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5892 080.77695 219,553
INSTALL 1,110 FEET OF 2 INCH POLY ALONG WILDGROVE DRIVE FROM MCDONALD
DRIVE TO SHIRLEY DRIVE IN GARLAND AND ABANDON 950 FEET OF 2 INCH STEEL
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5893 080.77700 219,691
INSTALL 5 FEET OF 2 INCH POLY ALONG STREETS OF SOUTHLAKE AND ABANDON
5 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS SOUTHLAKE SYSTEM INTEGRITY SEPTEMBER
5894 080.77706 22,361
PURCHASE AND INSTALL CARPORT AT THE FORT WORTH SOUTH FACILITY TO
STORE POLY PIPE MATERIAL. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JULY
5895 080.77708 475,704
INSTALL 1,070 FEET OF 4 INCH POLY AND ABANDON 1,700 FEET OF 6 INCH STEEL
ALONG I-45 HWY AND EAST ILLINOIS AVENUE IN DALLAS, DALLAS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5896 080.77710 331,764
INSTALL 1,660 FEET OF 4 INCH, 300 FEET OF 2 INCH POLY AND ABANDON 1,550
FEET OF 4 INCH, 240 FEET OF 2 INCH STEEL, 115 FEET OF 4 INCH, 60 FEET OF 2
INCH POLY ALONG GREEN RIVER TRAIL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5897 080.77714 470,977 INSTALL 155 FEET OF 2 INCH AND 40 FEET OF 6 INCH POLY IN THE ALLEY WEST OF R ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY DECEMBER
5898 080.77715 833,974
INSTALL 670 FEET OF 2 INCH, 1,120 FEET OF 4 INCH, 280 FEET OF 6 INCH POLY AND
ABANDON 1,037 FEET OF 2 INCH, 546 FEET OF 4 INCH, 262 FEET OF 6 INCH STEEL
AND 1.097 FEET OF 2 INCH POLY ALONG INTERSECTION OF BETHEL AND OLDHAM
IN WAXAHACHIE, ELLIS COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY DECEMBER
MTX Additions
Page 167 of 178
386
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5899 080.77716 354,275
INSTALL 520 FEET OF 2 INCH, 10 FEET OF 4 INCH, 850 FEET OF 6 INCH POLY AND
ABANDON 80 FEET OF 2 INCH, 30 FEET OF 4 INCH, 800 FEET OF 6 INCH STEEL ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY DECEMBER
5900 080.77717 390,588
INSTALL 420 FEET OF 2 INCH, 800 FEET OF 4 INCH POLY AND ABANDON 85 FEET OF
2 INCH, 25 FEET OF 4 INCH POLY AND 205 FEET OF 2 INCH, 1,700 FEET OF 4 INCH
STEEL ALONG OLDHAM AND FLAT IN WAXAHACHIE, ELLIS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY DECEMBER
5901 080.77721 254,662
INSTALL 3,100 FEET OF 2 INCH POLY AND ABANDON 100 FEET OF 1.25 INCH, 3,000
FEET OF 2 INCH STEEL ALONG OWENS AND LAMPASSAS IN ENNIS, ELLIS COUNTY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER
5902 080.77724 40,366
INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 2 INCH STEEL
ALONG THE RIGHT OF WAY OF ROSA AND ROWE IN ENNIS, ELLIS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER
5903 080.77730 288,559
INSTALL 880 FEET OF 6 INCH, 700 FEET OF 2 INCH POLY AND ABANDON 880 FEET
OF 6 INCH, 625 FEET OF 2 INCH STEEL ALONG MILAM AND CHATFIELD IN ENNIS,
ELLIS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER
5904 080.77736 49,395
RELOCATE FACILITIES. INSTALL 125 FEET OF 8 INCH POLY ALONG FISHER ROAD
IN WICHITA FALLS AND ABANDON POLY MAIN IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY SEPTEMBER
5905 080.77743 58,200
INSTALL 550 FEET OF 2 INCH POLY AND ABANDON 310 FEET OF 1.25 INCH, 160
FEET OF 2 INCH POLY AND 150 FEET OF 2 INCH STEEL ALONG DALLAS AND
MADISON IN ENNIS, ELLIS COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER
5906 080.77744 864,334
INSTALL 4,200 FEET OF 4 INCH, 1,035 FEET OF 2 INCH POLY ALONG CROCKETT,
MAIN AND NELSON STREETS AND ABANDON 3,605 FEET OF 4 INCH, 379 FEET OF 3
INCH, 530 FEET OF 2 INCH STEEL AND 612 FEET OF 4 INCH, 884 FEET OF 2 INCH,
262 FEET OF 1.25 INCH POLY IN DENISON, GRAYSON COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY DECEMBER
5907 080.77746 73,888
INSTALL 850 FEET OF 2 INCH POLY ALONG EDGEWOOD AND METROPOLITAN IN
ENNIS AND ABANDON 500 FEET OF 2 INCH STEEL AND 350 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER
5908 080.77747 25,307
REMOVE AND REPLACE THE DEAD VEGETATION AT CARROLLTON SERVICE
CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER
5909 080.77749 108,392
RELOCATE FACILITIES. INSTALL 760 FEET OF 6 INCH POLY ALONG STATE
HIGHWAY 6 IN COLLEGE STATION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS COLLEGE STATION
RELOCATION OF
FACILITIES DECEMBER
5910 080.77750 321,102
INSTALL 1,570 FEET OF 4 INCH POLY AND ABANDON 1,465 FEET OF 4 INCH STEEL,
105 FEET OF 4 INCH POLY ALONG SOUTH RIDGE TERRACE IN FORT WORTH,
TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5911 080.77751 440,357
INSTALL 2,540 FEET OF 4 INCH POLY AND ABANDON 1,678 FEET OF 3 INCH STEEL
AND 738 FEET OF 3 INCH POLY ALONG EAST SAUNDERS (FM 814) AND US HWY 69
IN TRENTON, FANNIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY DECEMBER
5912 080.77755 1,573,939
INSTALL 850 FEET OF 2 INCH, 530 FEET OF 4 INCH, 1,625 FEET OF 8 INCH POLY AND
ABANDON 640 FEET OF 2 INCH, 380 FEET OF 3 INCH, 475 FEET OF 4 INCH, AND
1,595 FEET OF 8 INCH STEEL ALONG WEBB CHAPEL ROAD IN DALLAS, DALLAS
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5913 080.77756 44,920
INSTALL DISTRICT REGULATOR STATION #21 ALONG EAST WILLINGHAM STREET
AND COLORADO STREET IN CLEBURNE AND ABANDON DISTRICT REGULATOR
STATION #21 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY SEPTEMBER
5914 080.77760 26,596
INSTALL 275 FEET OF 2 INCH POLY ALONG MURRAY STREET IN DALLAS AND
ABANDON 275 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
5915 080.77763 7,282
INSTALL 100 FEET OF 2 INCH POLY ALONG MACARTHUR AND SAM RAYBURN
TOLLWAY IN LEWISVILLE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL LEWISVILLE GROWTH SEPTEMBER
5916 080.77764 226,857
INSTALL 55 FEET OF 2 INCH POLY ALONG ROSSER SQUARE IN DALLAS AND
ABANDON 980 FEET OF POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5917 080.77768 22,353
PURCHASE NEW AIR CONDITIONING UNIT #2 AT SULPHUR SPRINGS SERVICE
CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER
5918 080.77771 270,298
INSTALL 1,550 FEET OF 4 INCH POLY ALONG FULLER AVENUE AND SOUTH RIDGE
TERRACE IN FORT WORTH AND ABANDON 1,370 FEET OF 4 INCH STEEL AND 180
FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5919 080.77772 7,989
REPLACED REMOTE TERMINAL UNIT (RTU) IN LEWISVILLE THAT WAS HIT AND
BURNED TO THE GROUND BY A CAR. ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY SEPTEMBER
5920 080.77786 (21,055)
INSTALL 150 FEET OF 2 INCH POLY AND ABANDON 150 FEET OF 2 INCH STEEL
ALONG FM 1033 NORTH OF US 287 IN TXDOT ROAD RIGHT OF WAY IN KIRKLAND,
CHILDRESS COUNTY. ALL CUSTOMERS KIRKLAND
RELOCATION OF
FACILITIES DECEMBER
5921 080.77787 10,689
INSTALL 1,244 FEET OF 4 INCH, 613 FEET OF 6 INCH, 2,501 FEET OF 2 INCH POLY
ALONG THE STREETS OF LISSO SUBDIVISION IN PFLUGERVILLE, TRAVIS COUNTY.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH DECEMBER
5922 080.77790 149,378
INSTALL 300 FEET OF 6 INCH POLY ALONG ESTERS ROAD IN DALLAS AND
ABANDON 160 FEET OF 4 INCH STEEL AND 100 FEET OF 6 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER
5923 080.77791 369,676
INSTALL 2,400 FEET OF 2 INCH POLY ALONG MELITA AVENUE AND OVERTON
ROAD IN FORT WORTH AND ABANDDON 1,280 FEET OF 3 INCH AND 1,120 FEET OF
2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5924 080.77793 1,009
INSTALL 70 FEET OF 6 INCH AND 507 FEET OF 4 INCH POLY ALONG SPRING CREEK
PARKWAY IN PLANO. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL PLANO GROWTH DECEMBER
5925 080.77794 35,799
INSTALL 300 FEET OF 4 INCH POLY ALONG THE STREETS OF RAILHEAD
DISTRIBUTION IN FORT WORTH. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH OCTOBER
5926 080.77802 34,042
INSTALL 100 FEET OF 4 INCH POLY ALONG HIGH COUNTRY DRIVE IN CARROLLTON
AND ABANDON 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY DECEMBER
5927 080.77808 752,655
INSTALL 2,503 FEET OF 2 INCH POLY ALONG RAVINA DRIVE AND CARROLL DRIVE
IN GARLAND AND ABANDON 2,517 FEET OF 2 INCH, 155 FEET OF 1.25 INCH STEEL
AND 25 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5928 080.77810 585,208
INSTALL 2,825 FEET OF 2 INCH POLY AND ABANDON 2,800 FEET OF 3 INCH STEEL
ALONG THE ALLEY BETWEEN SAN MARCUS AND SAN PAULA IN DALLAS, DALLAS
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5929 080.77812 476,218
INSTALL 1,732 FEET OF 2 INCH POLY ALONG BRANCH DRIVE IN GARLAND AND
ABANDON 1,706 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5930 080.77813 1,219
INSTALL 170 FEET OF 4 INCH AND 100 FEET OF 2 INCH POLY ALONG DEMOCRACY
DRIVE IN PLANO. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL PLANO GROWTH DECEMBER
5931 080.77814 358,575
INSTALL 1,929 FEET OF 2 INCH POLY ALONG WINIFRED DRIVE IN GARLAND AND
ABANDON 825 FEET OF 2 INCH, 1,195 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5932 080.77815 373,883
INSTALL 1,562 FEET OF 6 INCH POLY ALONG GLENBROOK DRIVE IN GARLAND AND
ABANDON 1,534 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
5933 080.77819 146,992
RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH POLY ALONG LYNWORTH
DRIVE ALLEY IN DALLAS AND ABANDON 600 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
MTX Additions
Page 168 of 178
387
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5934 080.77821 2,871
INSTALL 2,650 FEET OF 2 INCH AND 150 FEET OF 4 INCH POLY ALONG THE
STREETS OF SONOMA VERDE IN MCLENDON-CHISHOLM. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL ROCKWALL GROWTH DECEMBER
5935 080.77823 143,482
INSTALL 1,875 FEET OF 2 INCH POLY AND ABANDON 361 FEET OF 1 INCH, 499 FEET
OF 2 INCH, 774 FEET OF 4 INCH STEEL AND 15 FEET OF 4 INCH, 767 FEET OF 2 INCH
POLY ALONG 3RD AND AVENUE G IN CHILLICOTHE, HARDEMAN COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILLICOTHE SYSTEM INTEGRITY DECEMBER
5936 080.77825 186,940
RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY ALONG TOPHILL LANE
AND ABANDON 700 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
5937 080.77826 209,751
INSTALL 680 FEET OF 2 INCH, 620 FEET OF 4 INCH POLY ALONG MELITA AND
SOUTH RIDGE TERRACE IN FORT WORTH AND ABANDON 580 FEET OF 2 INCH AND
620 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5938 080.77832 32,597 INSTALL 365 FEET OF 2 INCH POLY ALONG HARVEY CIRCLE IN LITTLE ELM RESIDENTIAL LITTLE ELM GROWTH DECEMBER
5939 080.77840 791,883
INSTALL 1,200 FEET OF 6 INCH POLY AT NORTH BRYANT HIGHWAY 87 AND 6TH
STREET IN SAN ANGELO AND ABANDON 1,200 FEET OF 6 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY DECEMBER
5940 080.77842 353,736
INSTALL 1,150 FEET OF 4 INCH POLY ALONG WASHINGTON AND MALONEY
STREETS, 500 FEET OF 2 INCH POLY ALONG LIVE OAK STREET AND 10 FEET OF 4
INCH POLY ALONG SYCAMORE STREET AND ABANDON 675 FEET OF 6 INCH, 435
FEET OF 4 INCH, 475 FEET OF 2 INCH STEEL, 10 FEET OF 4 INCH, 380 FEET OF 2
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY DECEMBER
5941 080.77854 79,017
INSTALL 570 FEET OF 2 INCH POLY ALONG METROPOLITAN AND CHATFIELD IN
ENNIS AND ABANDON 470 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER
5942 080.77860 418,217
INSTALL 1,500 FEET OF 6 INCH POLY ALONG W. NEAL AND HUNT STREETS, 75 FEET
OF 4 INCH POLY ALONG HUNT STREET AND 375 FEET OF 2 INCH ALONG BOIS D
ARC STREET AND ABANDON 350 FEET OF 6 INCH, 965 FEET OF 4 INCH, 625 FEET
OF 3 INCH STEEL IN COMMERCE, HUNT COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY DECEMBER
5943 080.77865 117,942 INSTALL 40 FEET OF 6 INCH, 1,160 FEET OF 4 INCH AND 40 FEET OF 2 INCH POLY ALO ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY DECEMBER
5944 080.77867 219,524
INSTALL LOW PRESSURE STATION AT BRYAN DISTRICT REGULATOR STATION
DRS03 ALONG HASWELL DRIVIE AND ABANDON BRYAN DISTRICT REGULATOR
STATION DRS03 IN BRYAN, BRAZOS COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY DECEMBER
5945 080.77878 32,749 INSTALL 60 FEET OF 2 INCH POLY ALONG RAQUET CLUB COURT IN ARLINGTON. RESIDENTIAL ARLINGTON GROWTH DECEMBER
5946 080.77893 144,948
INSTALL LOW PRESSUER STATION AT HEARNE DISTRICT REGULATOR STATION
DRS02 AND ABANDON HEARNE DISTRICT REGULATOR STATION DRS02 ALONG THE
STREETS OF HEARNE, ROBERTSON COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY DECEMBER
5947 080.77894 135,482
INSTALL LOW PRESSURE STATION AT HEARNE DISTRICT REGULATOR STATION
DRS03 AND ABANDON HEARNE DISTRICT REGULATOR STATION DRS03 ALONG THE
STREETS OF HEARNE, ROBERTSON COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY DECEMBER
5948 080.77895 121,255
INSTALL LOW PRESSURE STATION AT HEARNE DISTRICT REGULATOR STATION
DRS05 AND ABANDON HEARNE DISTRICT REGULATOR STATION DRS05 ALONG THE
STREETS OF HEARNE, ROBERTSON COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY DECEMBER
5949 080.77897 17,515
INSTALL 282 FEET OF 2 INCH POLY ALONG MIDWAY ROAD IN DALLAS, DALLAS
COUNTY.
COMMERCIAL OR
INDUSTRIAL DALLAS GROWTH DECEMBER
5950 080.77898 54,536
INSTALL 452 FEET OF 2 INCH POLY ALONG HOLLOMAN STREET IN BRYAN AND
ABANDON 452 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORMANGEE SYSTEM INTEGRITY DECEMBER
5951 080.77899 120,580 INSTALL 670 FEET OF 4 INCH, 285 FEET OF 2 INCH POLY ALONG BILGLADE AND WES ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5952 080.77905 188,877
RELOCATE FACILITIES. INSTALL 7 SERVICES ALONG CHURCHILL ROAD TO
ACCOMMODATE CITY OF FORT WORTH PAVEMENT PROJECT AND ABANDON 7
SERVICES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5953 080.77907 4,561
INSTALL 650 FEET OF 2 INCH POLY ALONG CARTER COURT IN DENISON, GRAYSON
COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENISON GROWTH DECEMBER
5954 080.77909 945,669
PERFORM CAPITAL INTEGRITY DIGS ALONG LINE CA (2ND) EAST NEAR FORT
WORTH AND INSTALL CLOCKSPRINGS ON DIGS 2017-15 AND 2017-25 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5955 080.77912 188,611
INSTALL 550 FEET OF 2 INCH POLY ALONG WALKER AND CREECHVILLE ROAD IN
ENNIS, ELLIS COUNTY AND ABANDON 378 FEET OF 2 INCH STEEL, 272 FEET OF 2
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER
5956 080.77914 78,053
INSTALL 460 FEET OF 2 INCH POLY ALONG WARREN LANE AND ABANDON 460 FEET
OF 3 INCH STEEL IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5957 080.77916 89,264
INSTALL 372 FEET OF 2 INCH POLY AND 120 FEET OF 4 INCH STEEL ALONG
SHAWNEE AND CREECHVILLE ROAD IN ENNIS, ELLIS COUNTY AND ABANDON 372
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER
5958 080.77920 193,761
INSTALL 800 FEET OF 2 INCH, 420 FEET OF 4 INCH POLY ALONG CRETON COURT
AND CORDONE COURT AND ABANDON 800 FEET OF 2 INCH, 420 FEET OF 4 INCH
STEEL IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5959 080.77921 85,353
INSTALL DISTRICT REGULATOR STATION #01, 40 FEET OF 2 INCH POLY ALONG
NORTH BEAL STREET AND EAST 5TH AVENUE IN BELTON AND ABANDON DISTRICT
REGULATOR STATION #01 AND 40 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY DECEMBER
5960 080.77922 50,784
INSTALL REGULATOR SPOOL WITH RELIEF VALVE ALONG SOUTH MAIN STREET
AND EAST AVENUE A IN BELTON AND ABANDON WORKER MONITOR REGULATOR
SPOOL AT DISTRICT REGULATOR STATION #23 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY DECEMBER
5961 080.77923 114,821 INSTALL DISTRICT REGULATOR STATION #09, 80 FEET OF 4 INCH AND 2 INCH STEEL ALL CUSTOMERS CAMERON SYSTEM INTEGRITY DECEMBER
5962 080.77924 120,024 INSTALL DISTRICT REGULATOR STATION #01, 50 FEET OF 3 INCH, 50 FEET OF 2 INCH ALL CUSTOMERS LOTT SYSTEM INTEGRITY DECEMBER
5963 080.77925 127,571 INSTALL DISTRICT REGULATOR STATION #02, 50 FEET OF 3 INCH, 50 FEET OF 2 INCH ALL CUSTOMERS LOTT SYSTEM INTEGRITY DECEMBER
5964 080.77926 183,570 INSTALL DISTRICT REGULATOR STATION #04 AND 200 FEET OF 6 INCH POLY ALONG ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER
5965 080.77927 128,737 INSTALL DISTRICT REGULATOR STATION #05 AND 200 FEET OF 6 INCH POLY ALONG ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER
5966 080.77928 46,729
INSTALL DISTRICT REGULATOR STATION #07 ALONG WEST AVENUE L AND SOUTH
21ST STREET IN TEMPLE AND ABANDON DISTRICT REGULATOR STATION #07 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER
5967 080.77929 50,534
INSTALL NEW REGULATOR SPOOL AND RELIEF VALVE AND ABANDON ONE
REGULATOR IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER
5968 080.77930 110,372 INSTALL DISTRICT REGULATOR STATION #02, 40 FEET OF 2 INCH AND 40 FEET OF 4 ALL CUSTOMERS CAMERON SYSTEM INTEGRITY DECEMBER
5969 080.77932 40,356
INSTALL REGULATOR SPOOL AND RELIEF VALVE FOR DISTRCT REGULATOR
STATION #20 ALONG WEST AVENUE T AND SOUTH 5TH STREET IN TEMPLE AND
ABANDON WORKER MONITOR REGULATOR SPOOL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER
5970 080.77933 101,111 INSTALL DISTRICT REGULATOR STATION #21, 40 FEET OF 2 INCH AND 40 FEET OF 4 ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER
5971 080.77934 91,553
INSTALL DISTRICT REGULATOR STATION DRS01, 40 FEET OF 2 INCH, 40 FEET OF 4
INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS01, 80 FEET OF 4
INCH STEEL ALONG THE STREETS OF TROY, BELL COUNTY AND ABANDON
DISTRICT REGULATOR STATION DRS01 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TROY SYSTEM INTEGRITY DECEMBER
5972 080.77941 23,572
INSTALL 220 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 4 INCH STEEL
ALONG ANDERSON DRIVE IN HURST IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY SEPTEMBER
MTX Additions
Page 169 of 178
388
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
5973 080.77950 12,861
PURCHASE OF MIC TEST EQUIPMENT FOR NEW MIC TECH AT IRVING-ARLINGTON
SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT SEPTEMBER
5974 080.77953 18,104
INSTALL 805 FEET OF 2 INCH POLY ALONG DOWLING ROAD IN COLLEGE STATION.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL COLLEGE STATION GROWTH DECEMBER
5975 080.77960 275,027
INSTALL 1,600 FEET OF 4 INCH POLY AND ABANDON 1,600 FEET OF 4 INCH STEEL
ALONG WESTCREEK DRIVE AND CROMART COURT IN FORT WORTH, TARRANT
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5976 080.77961 3,057
RELOCATE FACILITIES. INSTALL 35 FEET OF 4 INCH POLY ALONG THE STREETS OF
BRIDGEPORT. ALL CUSTOMERS BRIDGEPORT
RELOCATION OF
FACILITIES OCTOBER
5977 080.77967 (129,417)
INSTALL 780 FEET OF 4 INCH, 831 FEET OF 2 INCH, AND 440 FEET OF 6 INCH POLY
ALONG HIDDEN LAKE DRIVE IN PFLUGERVILLE, TRAVIS COUNTY. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL PFLUGERVILLE GROWTH DECEMBER
5978 080.77969 16,396 PURCHASE NEW AIR CONDITIONING UNIT AT MCKINNEY SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER
5979 080.77970 354,579
INSTALL 600 FEET OF 6 INCH POLY ALONG MCKINNEY STREET IN DENTON AND
ABANDON 115 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER
5980 080.77971 158,019
INSTALL 510 FEET OF 4 INCH, 315 FEET OF 2 INCH POLY AND ABANDON 38 FEET OF
4 INCH, 315 FEET OF 2 INCH STEEL ALONG WESTCREEK DRIVE IN FORT WORTH,
TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5981 080.77972 (5,816)
RELOCATE FACILITIES. INSTALL 680 FEET OF 4 INCH POLY ALONG SOUTH OAKES
STREET IN SAN ANGELO AND ABANDON 535 FEET OF 4 INCH POLY AND 100 FEET
OF 4 INCH STEEL. ALL CUSTOMERS SAN ANGELO
RELOCATION OF
FACILITIES DECEMBER
5982 080.77985 262,729
INSTALL 1,600 FEET OF 2 INCH POLY AND ABANDON 1,600 FEET OF 3 INCH STEEL
ALONG VEGA COURT IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5983 080.77991 47,532
INSTALL MONITORING EQUIPMENT ON DISTRIBUTION SYSTEM AT HARVEST HILL
DEVELOPMENT IN NORTHLAKE. ALL CUSTOMERS NORTHLAKE SYSTEM INTEGRITY DECEMBER
5984 080.78001 244,501
RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG CINNABAR AND
SYMPHONY IN DALLAS AND ABANDON 100 FEET OF 4 INCH POLY. ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES DECEMBER
5985 080.78012 2,869
INSTALL 1,100 FEET OF 2 INCH POLY ALONG WOODBRIDGE TOWNHOMES IN
WYLIE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WYLIE GROWTH DECEMBER
5986 080.78014 263,593
INSTALL 1,310 FEET OF 2 INCH, 120 FEET OF 4 INCH POLY AND ABANDON 1,120
FEET OF 2 INCH AND 120 FEET OF 4 INCH POLY AND 190 FEET OF 2 INCH STEEL
ALONG WILLOW RIDGE ROAD AND LAKE CHARLES AVENUE IN FORT WORTH,
TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5987 080.78025 13,770 INSTALL 115 FEET OF 2 INCH POLY ALONG JACKSON STREET IN SAN ANGELO.
COMMERCIAL OR
INDUSTRIAL SAN ANGELO GROWTH OCTOBER
5988 080.78026 39,645
RELOCATE FACILITIES. INSTALL 384 FEET OF 2 INCH POLY ALONG MORNING
GLORY DRIVE IN FREDERICKSBURG. ALL CUSTOMERS FREDERICKSBURG
RELOCATION OF
FACILITIES OCTOBER
5989 080.78027 5,524
INSTALL 1,300 FEET OF 2 INCH AND 460 FEET OF 4 INCH POLY ALONG THE
STREETS OF WOODBRIDGE TOWNHOMES IN WYLIE. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL WYLIE GROWTH DECEMBER
5990 080.78028 27,832
INSTALL 100 FEET OF 2 INCH POLY ALONG KARNES DRIVE IN ROBINSON IN
ACCORDANCE WITH THE RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON GROWTH OCTOBER
5991 080.78030 147,802
INSTALL 600 FEET OF 4 INCH POLY ALONG THE STREETS OF HILLSBORO AND
ABANDON 600 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY OCTOBER
5992 080.78042 91,057
INSTALL 1,050 FEET OF 4 INCH POLY ALONG THE STREETS OF SANDY ACRES
TOWNHOMES IN FORT WORTH. RESIDENTIAL FORT WORTH GROWTH DECEMBER
5993 080.78047 26,353
INSTALL 1,000 FEET OF 6 INCH POLY ALONG BOAZ RANCH ROAD IN FORT WORTH.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH DECEMBER
5994 080.78049 237,934
INSTALL 1,100 FEET OF 4 INCH POLY AND ABANDON 1,100 FEET OF 4 INCH STEEL
ALONG GREEN RIVER TRAIL IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
5995 080.78062 12,838
INSTALL 679 FEET OF 4 INCH POLY ALONG SOUTH FREEWAY IN FORT WORTH,
TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH DECEMBER
5996 080.78064 23,360
INSTALL 100 FEET OF 2 INCH POLY ALONG KILLION AND WALNUT HILL IN DALLAS
AND ABANDON 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY OCTOBER
5997 080.78075 424,715
RELOCATE FACILITIES. INSTALL 1,160 FEET OF 6 INCH, 680 FEET OF 4 INCH POLY
ALONG ROBERTS CUTOFF IN RIVER OAKS, TARRANT COUNTY AND ABANDON 470
FEET OF 2 INCH, 1,110 FEET OF 6 INCH STEEL AND 250 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY DECEMBER
5998 080.78076 18,695
INSTALL 700 FEET OF 2 INCH POLY ALONG MODERA WALSH RANCH SUBDIVISION
IN FORT WORTH. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH DECEMBER
5999 080.78081 48,793
INSTALL 250 FEET OF 2 INCH POLY ALONG HUNT STREET IN GORDON AND
ABANDON 100 FEET OF 2 INCH AND 150 FEET OF 3 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORDON SYSTEM INTEGRITY DECEMBER
6000 080.78092 73,735
INSTALL RELIEF VALVES AT ATHENS DISTRICT REGULATOR STATION #02 ALONG
SOUTH MURCHISON STREET AND EAST CORSICANA STREET AND DISTRICT
REGULATOR STATION #03 ALONG MACK STREET IN ATHENS IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY DECEMBER
6001 080.78093 819,592
RELOCATE FACILITIES. INSTALL 150 FEET OF 12 INCH STEEL ALONG FINFEATHER
DT LINE AT ESTHER BOULEVARD IN BRYAN AND ABANDON 150 FEET OF 12 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY DECEMBER
6002 080.78098 33,776 INSTALL 165 FEET OF 2 INCH POLY ALONG WEST COLLLINS STREET IN DENISON RESIDENTIAL DENISON GROWTH OCTOBER
6003 080.78102 27,797 INSTALL 510 FEET OF 2 INCH POLY ALONG MASON AT LANCE ROAD IN BOWIE. ALL CUSTOMERS BOWIE GROWTH DECEMBER
6004 080.78104 24,080
RELOCATE FACILITIES. INSTALL 755 FEET OF 4 INCH POLY ALONG NORTH
COLLEGE AVENUE AND ABANDON 300 FEET OF 4 INCH STEEL AND 300 FEET OF 2
INCH POLY IN SNYDER, SCURRY COUNTY. ALL CUSTOMERS SNYDER
RELOCATION OF
FACILITIES DECEMBER
6005 080.78105 52,382
INSTALL DISTRICT REGULATOR STATION #401 ALONG MT. VERNON AVENUE AND
MOUNT VIEW AVENUE IN FORT WORTH AND ABANDON DISTRICT REGULATOR
STATION #401 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
6006 080.78109 225,013
INSTALL 1,015 FEET OF 4 INCH, 215 FEET OF 2 INCH POLY AND ABANDON 1,015
FEET OF 4 INCH, 215 FEET OF 2 INCH STEEL ALONG GREEN RIVER TRAIL IN FORT
WORTH, TARRANT COUNTY, IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
6007 080.78120 11,248
INSTALL 275 FEET OF 2 INCH POLY ALONG HERITAGE AVENUE IN COLLEYVILLE,
TARRANT COUNTY.
COMMERCIAL OR
INDUSTRIAL COLLEYVILLE GROWTH DECEMBER
6008 080.78125 233,750
INSTALL 45 FEET OF 8 INCH POLY ALONG WALNUT AND CENTRAL IN DALLAS AND
ABANDON 45 FEET OF 8 INCH STEEL AND INOPERABLE 8 INCH EMR VALVE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
6009 080.78127 91,920
INSTALL 1,500 FEET OF 2 INCH POLY ALONG THE STREETS OF HIGHWOOD
VILLAGE IN FORT WORTH. RESIDENTIAL FORT WORTH GROWTH DECEMBER
6010 080.78128 9,008
PURCHASE 3 NEW GARAGE DOOR OPENERS FOR SULPHUR SPRINGS SERVICE
CENTER ALL CUSTOMERS SYSTEM WIDE STRUCTURES OCTOBER
6011 080.78129 49,086
INSTALL 3,250 FEET OF 4 INCH POLY ALONG NORTH COWTOWN CROSSING
SUBDIVISION IN FORT WORTH. DEVLEOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH DECEMBER
6012 080.78130 1,682
PURCHASE PNEUMATIC AIR DRILLS WITH ADAPTERS FOR WELDER IN SOUTH
DALLAS REGION. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT NOVEMBER
6013 080.78131 (12,782)
RELOCATE FACILITIES. INSTALL 160 FEET OF 4 INCH POLY ALONG WOODARD
AVENUE IN CLEBURNE AND ABANDON 160 FEET OF 4 INCH POLY. ALL CUSTOMERS CLEBURNE
RELOCATION OF
FACILITIES DECEMBER
6014 080.78133 633,745
INSTALL 1,710 FEET OF 4 INCH, 1,120 FEET OF 2 INCH POLY AND ABANDON 2,830
FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG GOLDWOOD AND
HAVENWOOD IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
6015 080.78137 (47,439) INSTALL 300 FEET OF 2 INCH POLY ALONG ACCESS ROAD IN HAWLEY.
COMMERCIAL OR
INDUSTRIAL HAWLEY GROWTH DECEMBER
MTX Additions
Page 170 of 178
389
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
6016 080.78143 413,590
INSTALL 1,643 FEET OF 4 INCH, 94 FEET OF 2 INCH POLY ALONG AVENUE D FROM
FIRST STREET TO THIRD STREET IN GARLAND AND ABANDON 1,064 FEET OF 2
INCH POLY AND 188 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
6017 080.78145 27,178
INSTALL 275 FEET OF 2 INCH POLY ALONG F STREET IN KERRVILLE AND ABANDON
275 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY OCTOBER
6018 080.78146 175,029
INSTALL 997 FEET OF 2 INCH POLY ALONG AVENUE E FROM THIRD STREET TO
FIRST STREET IN GARLAND AND ABANDON 990 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
6019 080.78147 252,082
INSTALL 1,443 FEET OF 2 INCH POLY ALONG AVENUE F FROM THIRD STREET TO
FIRST STREET IN GARLAND AND ABANDON 1,856 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
6020 080.78149 118,855 RELOCATRE FACILITIES. INSTALL 191 FEET OF 6 INCH AND 227 FEET OF 4 INCH POL ALL CUSTOMERS BURLESON SYSTEM INTEGRITY DECEMBER
6021 080.78150 32,149 INSTALL 100 FEET OF 4 INCH POLY ALONG ARKANSAS LANE IN ARLINGTON.
COMMERCIAL OR
INDUSTRIAL ARLINGTON GROWTH DECEMBER
6022 080.78153 (113,136) INSTALL 350 FEET OF 2 INCH POLY ALONG MAPLE AVENUE IN DALLAS. RESIDENTIAL DALLAS GROWTH DECEMBER
6023 080.78155 10,186 INSTALL 220 FEET OF 2 INCH POLY ALONG CALHOUN STREET IN EASTLAND. ALL CUSTOMERS EASTLAND SYSTEM INTEGRITY DECEMBER
6024 080.78161 442,641
PURCHASE 14 VMDS (SYSTEM WITH 5' SURVEY BAR, INCLUDES MOUNTING KIT
AND PROTECTIVE SHIELD) THROUGHOUT THE MID-TEX DIVISION. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT DECEMBER
6025 080.78163 217,891
PURCHASE 18 SENSIT LZ30'S FOR LEAK INVESTIGATION THROUGHT THE MID-TEX
DIVISION. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT SEPTEMBER
6026 080.78167 41,746
INSTALL 4,000 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY ALONG THE
STREETS OF MERKEL.
COMMERCIAL OR
INDUSTRIAL MERKEL GROWTH DECEMBER
6027 080.78168 7,729
PURCHASE COMPUTER, MONITORS, MODEMS AND TRUCK MOUNTING EQUIPMENT
FOR ABILENE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT DECEMBER
6028 080.78169 46,546
INSTALL 525 FEET OF 2 INCH POLY ALONG CROCKETT AND CARLTON IN ENNIS
AND ABANDON 444 FEET OF 2 INCH STEEL AND 65 FEET OF 2 INCH AND 13 FEET
OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER
6029 080.78172 659,378
INSTALL 315 FEET OF 4 INCH AND 2,155 FEET OF 2 INCH POLY AND ABANDON 315
FEET OF 4 INCH, 2,155 FEET OF 3 INCH STEEL AND 10 FEET OF 4 INCH POLY
ALONG THE ALLEY OF IVYWOOD AND HAVENWOOD IN DALLAS, DALLAS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
6030 080.78173 55,679
INSTALL 250 FEET OF 2 INCH POLY ALONG WACO AND CARLTON IN ENNIS AND
ABANDON 650 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY DECEMBER
6031 080.78176 240,628
INSTALL 1,250 FEET OF 8 INCH AND 10 FEET OF 2 INCH POLY AND ABANDON 755
FEET OF 3 INCH STEEL ALONG DOUGLAS AND RIGBSY STREETS IN VAN ALSTYNE,
GRAYSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY DECEMBER
6032 080.78181 26,463
INSTALL 470 FEET OF 4 INCH AND 1,170 FEET OF 2 INCH POLY ALONG THE
STREETS OF ELLISON ESTATES SUBDIVISION IN SAN ANGELO. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL SAN ANGELO GROWTH DECEMBER
6033 080.78183 166,078 INSTALL 350 FEET OF 6 INCH POLY ALONG POWER WAY IN MIDLOTHIAN. ALL CUSTOMERS MIDLOTHIAN GROWTH DECEMBER
6034 080.78184 211,319 INSTALL DISTRICT REGULATOR STATION #13 AND 1,200 FEET OF 4 INCH AND 10 FEE ALL CUSTOMERS RANGER SYSTEM INTEGRITY DECEMBER
6035 080.78187 6,478
INSTALL 334 FEET OF 2 INCH POLY ALONG THE STREETS OF TRINITY PLAZA
DEVELOPMENT IN TEMPLE.
COMMERCIAL OR
INDUSTRIAL TEMPLE GROWTH OCTOBER
6036 080.78189 462,128
INSTALL 735 FEET OF 8 INCH, 1,305 FEET OF 2 INCH POLY AND ABANDON 725 FEET
OF 8 INCH, 1305 FEET OF 3 INCH STEEL AND 10 FEET OF 8 INCH POLY ALONG
CREST RIDGE DR AND CASA VIEW ALLEY IN DALLAS, DALLAS COUNTY, IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
6037 080.78192 169,105
INSTALL 3,720 FEET OF 2 INCH POLY ALONG THE STREETS OF WESTPOINT
CROSSING SUBDIVISION IN FORT WORTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
6038 080.78193 514,666
INSTALL 330 FEET OF 4 INCH AND 2,140 FEET OF 2 INCH POLY AND ABANDON 330
FEET OF 4 INCH, 2,140 FEET OF 3 INCH STEEL AND 10 FEET OF 4 INCH POLY
ALONG THE ALLEY BETWEEN IVYWOOD AND JADEWOOD NEAR RACINE IN
DALLAS, DALLAS COUNTY, IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
6039 080.78194 821,866
INSTALL 2,035 FEET OF 4 INCH AND 1,315 FEET OF 2 INCH POLY AND ABANDON 960
FEET OF 4 INCH, 2,390 FEET OF 3 INCH STEEL ALONG THE ALLEY BETWEEN
KIRNWOOD AND JADEWOOD NEAR RACINE IN DALLAS, DALLAS COUNTY, IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
6040 080.78195 18,776
INSTALL 400 FEET OF 2 INCH POLY ALONG VALLEY DRIVE IN NORTH RICHLAND
HILLS, TARRANT COUNTY. RESIDENTIAL NORTH RICHLAND HILLS GROWTH DECEMBER
6041 080.78201 33,901
INSTALL 100 FEET OF 2 INCH POLY ALONG STILLHOUSE HOLLOW COURT IN
PROSPER. RESIDENTIAL PROSPER GROWTH DECEMBER
6042 080.78204 14,524
INSTALL 1,115 FEET OF 8 INCH, 2,617 FEET OF 6 INCH, 181 FEET OF 4 INCH, AND
3,627 FEET OF 2 INCH POLY ALONG THE STREETS OF SALERNO SUBDIVISION IN
ROUND ROCK, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
6043 080.78205 (12,670)
RELOCATE FACILITIES. INSTALL 1,550 FEET OF 2 INCH POLY ALONG BOURLAND
LANE IN WICHITA FALLS. ALL CUSTOMERS WICHITA FALLS
RELOCATION OF
FACILITIES NOVEMBER
6044 080.78216 32,030
REPLACE DISTRICT REGULATOR STATION DRS11 RELIEF SPOOL AND VALVE IN
IOWA PARK, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY DECEMBER
6045 080.78218 330,623
INSTALL 2,510 FEET OF 4 INCH, 2,990 FEET OF 2 INCH POLY ALONG THE STREETS
OF BAILEY PARK SUBDIVISION IN FORT WORTH, TARRANT COUNTY. DEVELOPER
INSTALLED FACILIITES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
6046 080.78220 10,986 INSTALL 180 FEET OF 2 INCH POLY ALONG CRETE STREET IN NORMANGEE. RESIDENTIAL NORMANGEE GROWTH DECEMBER
6047 080.78226 5,278
RELOCATE FACILITIES. INSTALL 7 .75 INCH SERVICE LINES ALONG CROSS BEND
ROAD AND KNOB HILL IN PLANO AND ABANON 7 .75 INCH SERVICE LINES TO
ACCOMMODATE THE CITY OF PLANO'S INSTALLATION OF A SCREENING WALL. ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES DECEMBER
6048 080.78229 58,868
INSTALL 400 FEET OF 2 INCH POLY ALONG NORTH CENTRAL AVENUE IN KNOX
CITY AND ABANDON 420 FEET 1.25 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KNOX CITY SYSTEM INTEGRITY DECEMBER
6049 080.78230 433,766
INSTALL 1,580 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY ALONG STREETS OF
SNYDER AND ABANDON 386 FEET OF 3 INCH AND 1,200 FEET OF 4 INCH POLY AND
DISTRICT REGULATOR STATION #14 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY DECEMBER
6050 080.78232 5,430
PURCHASE OF 2 LEAK DETECTORS SENSIT GOLD G2 4- GAS TC CGI COMBUSTIBLE
GAS INDICATORS FOR THE FORT WORTH SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT SEPTEMBER
6051 080.78233 148,919
RELOCATE FACILITIES. INSTALL 13 SERVICE LINES ALONG CRAVENS ROAD IN
FORT WORTH AND ABANDON 13 SERVICE LINES TO ACCOMMODATE THE CITY OF
FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
6052 080.78234 0
ABANDON 2,675 FEET OF 2 INCH POLY ALONG THE STREETS OF GLEN CROSSING
IN CELINA. ALL CUSTOMERS CELINA SYSTEM INTEGRITY DECEMBER
6053 080.78247 (1,715)
RELOCATE FACILITIES. INSTALL 25 FEET OF 6 INCH POLY ALONG SOUTH MAIN
STREET IN MANSFIELD AND ABANDON 15 FEET OF 6 INCH POLY. ALL CUSTOMERS MANSFIELD
RELOCATION OF
FACILITIES DECEMBER
6054 080.78252 35,394
INSTALL 2,405 FEET OF 4 INCH, 4,540 FEET OF 2 INCH POLY ALONG THE STREETS
OF MARINE CREEK RANCH SUBDIVISION IN FORT WORTH, TARRANT COUNTY.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
6055 080.78254 7,838 INSTALL 300 FEET OF 6 INCH POLY ALONG THE STREETS OF NORTHLAKE.
COMMERCIAL OR
INDUSTRIAL NORTHLAKE GROWTH DECEMBER
6056 080.78256 23,382
INSTALL 1,020 FEET OF 4 INCH POLY ALONG THE STREETS OF FATE VILLAGE IN
FATE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FATE GROWTH DECEMBER
6057 080.78257 8,165
INSTALL 500 FEET OF 4 INCH POLY ALONG MARINA BAY IN ROWLETT. DEVELOPER
INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL ROWLETT GROWTH DECEMBER
6058 080.78262 19,749 INSTALL 100 FEET OF 2 INCH POLY ALONG LIMERICK LANE IN GRAPEVINE. RESIDENTIAL GRAPEVINE GROWTH OCTOBER
6059 080.78263 12,098
INSTALL 350 FEET OF 2 INCH POLY ALONG AIRPORT ROAD IN ROCKWALL.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH OCTOBER
MTX Additions
Page 171 of 178
390
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
6060 080.78264 443,571
INSTALL 2,560 FEET OF 4 INCH AND 5,350 FEET OF 2 INCH POLY ALONG THE
STREETS OF NORTHSAR SUBDIVISION IN FORT WORTH. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
6061 080.78270 33,011
INSTALL 165 FEET OF 2 INCH POLY ALONG PROSPER TRAIL IN PROSPER, COLLIN
COUNTY.
COMMERCIAL OR
INDUSTRIAL PROSPER GROWTH DECEMBER
6062 080.78283 37,102 INSTALL 100 FEET OF 2 INCH POLY ALONG BRIDAL WREATH LANE IN DALLAS. RESIDENTIAL DALLAS GROWTH DECEMBER
6063 080.78300 350,280
INSTALL 1,865 FEET OF 6 INCH AND 200 FEET OF 2 INCH POLY ALONG ILLINOIS
DRIVE AND MAPLE STREET IN CELINA AND ABANDON 250 FEET OF 3 INCH AND 200
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS CELINA SYSTEM INTEGRITY DECEMBER
6064 080.78301 359,827
INSTALL 1,338 FEET OF 6 INCH AND 515 FEET OF 2 INCH POLY AND ABANDON 1,450
FEET OF 2 INCH POLY ALONG BEECH STREET AND ILLINOIS DRIVE IN CELINA,
COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CELINA SYSTEM INTEGRITY DECEMBER
6065 080.78314 24,534 INSTALL 145 FEET OF 4 INCH POLY ALONG NORTH KENT IN GORMAN. ALL CUSTOMERS GORMAN GROWTH DECEMBER
6066 080.78319 (57,174)
INSTALL 450 FEET OF 2 INCH POLY ALONG AUTUMN SLATE DRIVE IN
PFLUGERVILLE, WILLIAMSON COUNTY.
COMMERCIAL OR
INDUSTRIAL PFLUGERVILLE GROWTH DECEMBER
6067 080.78337 102,384
INSTALL 1,349 FEET OF 6 INCH POLY ALONG STREET OF ABILENE, TAYLOR
COUNTY.
COMMERCIAL OR
INDUSTRIAL ABILENE GROWTH DECEMBER
6068 080.78338 30,958
INSTALL 2,790 FEET OF 8 INCH, 361 FEET OF 2 INCH POLY ALONG HWY 195 IN
GEORGETOWN, WILLIAMSON COUNTY.
COMMERCIAL OR
INDUSTRIAL GEORGETOWN GROWTH DECEMBER
6069 080.78344 15,949
INSTALL 285 FEET OF POLY ALONG CLEVELAND STREET IN NORTH ZULCH AND
ABANDON 277 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTH ZULCH SYSTEM INTEGRITY SEPTEMBER
6070 080.78345 17,444 INSTALL 130 FEET OF 2 INCH POLY ALONG NORTH MAIN STREET IN CORSICANA.
COMMERCIAL OR
INDUSTRIAL CORSICANA GROWTH DECEMBER
6071 080.78349 493,105
INSTALL 1,580 FEET OF 6 INCH POLY AND ABANDON 1,510 FEET OF 6 INCH STEEL
ALONG GLENBROOK DRIVE ALLEY FROM KINGSLEY ROAD AND BRANCH DRIVE IN
GARLAND, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
6072 080.78350 264,820
INSTALL 80 FEET OF 2 INCH, 1,610 FEET OF 6 INCH POLY ALONG EAST GARFIELD
STREET AND NORTH 8TH STREET IN TEMPLE AND ABANDON 23 FEET OF 2 INCH,
1,110 FEET OF 4 INCH AND 300 FEET OF STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER
6073 080.78351 24,582
PURCHASE COMPUTER, MONITORS, MODEMS AND TRUCK MOUNTING EQUIPMENT
FOR ABILENE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT NOVEMBER
6074 080.78358 10,904
INSTALL 175 FEET OF 2 INCH POLY ALONG CHISHOLM TRAIL IN ROCKWALL.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH DECEMBER
6075 080.78364 73,089
RELOCATE FACILITIES. INSTALL 570 FEET OF 4 INCH POLY AND ABANDON 570
FEET OF 4 INCH POLY ALONG GREENS PRAIRIE TRAIL IN COLLEGE STATION,
BRAZOS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY DECEMBER
6076 080.78366 73,330
INSTALL 1,364 FEET OF 4 INCH POLY ALONG THE STREETS OF MIDTOWN RESERVE
SUBDIVISION IN COLLEGE STATION, BRAZOS COUNTY. DEVELOPER INSTALLED
FACILTIIES. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER
6077 080.78367 107,600
INSTALL 400 FEET OF 6 INCH POLY ALONG HIGHWAY 75 AND ABANDON 400 FEET
OF 6 INCH POLY IN MCKINNEY, COLLIN COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY DECEMBER
6078 080.78374 73,727
INSTALL 420 FEET OF 2 INCH POLY ALONG MASSIE AND HIGH STREET IN
THROCKMORTON AND ABANDON 500 FEET OF 1 INCH, 20 FEET OF 2 INCH STEEL
AND 487 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THROCKMORTON SYSTEM INTEGRITY DECEMBER
6079 080.78376 4,835
PURCHASE SQUEEZE TOOL AND MULTI-CLAMP KIT FOR DESOTO SERVICE
CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT DECEMBER
6080 080.78378 4,303
ABANDON 104 FEET OF 2 INCH STEEL ALONG POLK AT AVENUE L IN WICHITA
FALLS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
6081 080.78379 71,929
INSTALL 125 FEET OF 8 INCH POLY ALONG HEIGHTS BOULEVARD AND FM2181 IN
DENTON AND ABANDON 100 FEET OF POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER
6082 080.78384 (331,795)
INSTALL 7,400 FEET OF 4 INCH AND 50 FEET OF 2 INCH POLY AND DISTRICT
REGULATOR STATION AND ABANDON 13 FEET OF 4 INCH AND 8 FEET OF 2 INCH
POLY ALONG THE STREETS OF WICHITA FALLS, WICHITA COUNTY. ALL CUSTOMERS WICHITA FALLS
RELOCATION OF
FACILITIES DECEMBER
6083 080.78386 3,112
RELOCATE FACILITIES. INSTALL 1,200 FEET OF 4 INCH POLY ALONG FM 548 IN
FORNEY AND ABANDON 1,400 FEET OF 4 INCH POLY. DEVELOPER INSTALLED
FACILITIES. ALL CUSTOMERS FORNEY
RELOCATION OF
FACILITIES DECEMBER
6084 080.78389 321,805
INSTALL 1,090 FEET OF 4 INCH, 895 FEET OF 2 INCH POLY AND ABANDON 870 FEET
OF 3 INCH, 540 FEET OF 2 INCH STEEL AND 450 FEET OF 2 INCH POLY ALONG
LEEWOOD STREET AND LAPSLEY STREET IN DALLAS, DALLAS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
6085 080.78396 24,344
INSTALL 1,920 FEET OF 2 INCH POLY ALONG THE STREETS OF OLDHAM OAKS
SUBDIVISION IN ABILENE, TAYLOR COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ABILENE GROWTH DECEMBER
6086 080.78398 458,646
INSTALL 575 FEET OF 2 INCH, 2,050 FEET OF 6 INCH POLY AND ABANDON 508 FEET
OF 2 INCH STEEL AND 352 FEET OF 4 INCH POLY ALONG BROWN TRAIL AND PAGE
STREET IN HURST, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
6087 080.78399 7,376
INSTALL 2,100 FEET OF 4 INCH POLY AND ABANDON 345 FEET OF 4 INCH POLY
ALONG THE STREETS OF ABILENE, TAYLOR COUNTY. ALL CUSTOMERS ABILENE
RELOCATION OF
FACILITIES DECEMBER
6088 080.78400 515,461
INSTALL 350 FEET OF 2 INCH, 1,980 FEET OF 6 INCH POLY AND ABANDON 566 FEET
OF 2 INCH, 11 FEET OF 3 INCH, AND 2,867 FEET OF 2 INCH STEEL ALONG BROWN
TRAIL AND EAST REDBUD IN HURST, TARRANT COUNTY, IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
6089 080.78401 257,229
INSTALL 2,460 FEET OF 4 INCH POLY AND ABANDON 1,550 FEET OF 3 INCH, 670
FEET OF 4 INCH STEEL AND 123 FEET OF 3 INCH POLY ALONG EAST PECAN,
TANGLEWOOD AND EAST REDBUD IN HURST, TARRANT COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
6090 080.78402 365,956
INSTALL 670 FEET OF 2 INCH AND 700 FEET OF 6 INCH POLY AND ABANDON 666
FEET OF 2 INCH AND 990 FEET OF 4 INCH STEEL ALONG EAST PECAN IN HURST,
TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
6091 080.78404 317,318
INSTALL 900 FEET OF 4 INCH, 880 FEET OF 8 INCH POLY AND ABANDON 839 FEET
OF 3 INCH, 766 FEET OF 8 INCH STEEL AND 58 FEET OF 3 INCH POLY ALONG
BROOKFIELD DRIVE AND BELLAIRE DRIVE IN HURST, TARRANT COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
6092 080.78415 (7,158)
RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH POLY ALONG CABELA DRIVE
IN FORT WORTH AND ABANDON 50 FEET OF 6 INCH POLY TO ACCOMMODATE
ONCOR MANHOLE INSTALLATION. ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES DECEMBER
6093 080.78416 (39,086)
RELOCATE FACILITIES. INSTALL 100 FEET OF 8 INCH POLY ALONG WASHINGTON
STREET AND COLUMBUS AVENUE IN WACO, MCLENNAN COUNTY AND ABANDON
100 FEET OF 8 INCH STEEL. ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES DECEMBER
6094 080.78424 939
INSTALL 1,200 FEET OF 4 INCH POLY ALONG MAIN STREET IN ROCKWALL.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL ROCKWALL GROWTH DECEMBER
6095 080.78429 205,944
INSTALL 750 FEET OF 4 INCH POLY AND ABANDON 750 FEET OF 3 INCH STEEL
ALONG EAST JEFFERSON STREET TO POLK IN WHITNEY, HILL COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITNEY SYSTEM INTEGRITY DECEMBER
6096 080.78431 2,816 PURCHASE OF 2 HILTI BRAND CUT OF SAWS FOR KERRVILLE SERVICE CENTER ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT NOVEMBER
6097 080.78432 2,736 PURCHASE OF 2 SENSIT TRACK IT FOR TEMPLE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT SEPTEMBER
6098 080.78434 5,737
PURCHASE THREE (3) VALVE CHANGERS FOR ROUND ROCK SERVICE CENTER,
ROUND ROCK, WILLIAMSON COUNTY. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT DECEMBER
MTX Additions
Page 172 of 178
391
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
6099 080.78444 398,559
INSTALL 1,777 FEET OF 4 INCH POLY AND ABANDON 1,717 FEET OF 2 INCH STEEL
AND 30 FEET OF 2 INCH POLY ALONG RANCH DRIVE ALLEY FROM KINGSLEY ROAD
TO BRANCH DRIVE IN GARLAND, DALLAS COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
6100 080.78445 179,386
INSTALL 1,250 FEET OF 2 INCH POLY AND ABANDON 947 FEET OF 4 INCH STEEL
ALONG AVENUE F ALLEY FROM THIRD STREET TO FIRST STREET IN GARLAND,
DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
6101 080.78448 259,970
INSTALL 1,897 FEET OF 2 INCH POLY AND ABANDON 692 FEET OF 4 INCH, 72 FEET
OF 2 INCH, 32 FEET OF 1.25 INCH POLY, 442 FEET OF 3 INCH, 513 FEET OF 2 INCH
STEEL ALONG FIFTH STREET FROM AVENUE D TO AVENUE F IN GARLAND, DALLAS
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
6102 080.78450 138,012
INSTALL 5,070 FEET OF 2 INCH POLY ALONG THE STREETS OF SOLTERRA
SUBDIVISION IN MESQUITE, DALLAS COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MESQUITE GROWTH DECEMBER
6103 080.78456 531,930
INSTALL 2,950 FEET OF 4 INCH, 1,900 FEET OF 2 INCH POLY AND ABANDON 2,950
FEET OF 4 INCH AND 2,160 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF
GLENN HEIGHTS DRAINAGE IMPROVEMENT PROJECT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLENN HEIGHTS SYSTEM INTEGRITY DECEMBER
6104 080.78464 185,459
INSTALL 1,265 FEET OF 2 INCH POLY AND ABANDON 979 FEET OF 3 INCH STEEL
ALONG STATE STREET FROM THIRD STREET TO FIRST STREET IN GARLAND,
DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
6105 080.78466 24,956 INSTALL 250 FEET OF 2 INCH POLY ALONG HARMON ROAD IN FORT WORTH.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH DECEMBER
6106 080.78472 3,422,012
INSTALL 16 INCH EMR-024B VALVE, 16 INCH EMR VALVE, 24 INCH EMR VALVE AND
10 FEET OF 24 INCH STEEL AND ABANDON 16 INCH EMR-024B VALVE, 16 INCH EMR
VALVE, 24 INCH EMR VALVE AND 10 FEET OF 24 INCH STEEL IN DALLAS, DALLAS
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
6107 080.78475 12,053 PURCHASE ICE MACHINE FOR THE BRYAN SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER
6108 080.78490 3,487
INSTALL 5 FEET OF 2 INCH POLY ALONG AVENUE L IN WICHITA FALLS AND
ABANDON 5 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY OCTOBER
6109 080.78506 417,115
INSTALL 3,311 FEET OF 2 INCH, 429 FEET OF 4 INCH POLY AND ABANDON 252 FEET
OF 2 INCH, 1,637 FEET OF 3 INCH, AND 254 FEET OF 2 INCH STEEL AND 500 FEET
OF 2 INCH POLY ALONG NORTH 14TH STREET AND NORTH 12TH STREET IN
TEMPLE, BELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER
6110 080.78508 190,167
INSTALL 1,250 FEET OF 2 INCH POLY AND ABANDON 950 FEET OF 2 INCH STEEL,
320 FEET OF 2 INCH POLY ALONG LOCUST STREET IN AZLE, TARRANT COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AZLE SYSTEM INTEGRITY DECEMBER
6111 080.78509 510,352
INSTALL 2,242 FEET OF 4 INCH, 189 FEET OF 2 INCH POLY AND ABANDON 1,987
FEET OF 2 INCH STEEL AND 16 FEET OF 2 INCH POLY ALONG MCDONALD DRIVE
ALLEY FROM SATURN ROAD TO BRANCH DRIVE IN GARLAND, DALLAS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
6112 080.78513 22,770
INSTALL 325 FEET OF 4 INCH POLY ALONG FM 1709 IN SOUTHLAKE, TARRANT
COUNTY.
COMMERCIAL OR
INDUSTRIAL SOUTHLAKE GROWTH DECEMBER
6113 080.78519 3,354
INSTALL 1,270 FEET OF 4 INCH POLY ALONG EAST MEADOWS BOULEVARD IN
MESQUITE, DALLAS COUMTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL MESQUITE GROWTH DECEMBER
6114 080.78522 8,371 PURCHASE OF 2 AIR MOTOR 90 DEGREE ANGLE DRIVE FOR ABILENE C&M. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT SEPTEMBER
6115 080.78524 7,863
INSTALL 1,085 FEET OF 4 INCH POLY ALONG PLANTERS ROAD IN SUNNYVALE,
DALLAS COUNTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL SUNNYVALE GROWTH DECEMBER
6116 080.78526 (71,416)
RELOCATE FACILITIES. INSTALL 700 FEET OF 4 INCH POLY ALONG PARK STREET
AND CORSICANA HIGHWAY IN HILLSBORO AND ABANDON 335 FEET OF 3 INCH
STEEL. ALL CUSTOMERS HILLSBORO
RELOCATION OF
FACILITIES DECEMBER
6117 080.78528 151,181 INSTALL DISTRICT REGULATOR STATION #36 AND #10 AND 45 FEET OF 4 INCH, 360 F ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY DECEMBER
6118 080.78530 277,342
INSTALL 1,000 FEET OF 6 INCH STEEL AND ABANDON 1,000 FEET OF 6 INCH STEEL
FROM STATION 835+08 TO 845+08 IN LAWN IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAWN SYSTEM INTEGRITY DECEMBER
6119 080.78536 16,280
PURCHASE NEW EQUIPMENT FOR NEW SERVICE TECHNICIANS IN PLANO
SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT SEPTEMBER
6120 080.78545 14,564
INSTALL 90 FEET OF 6 INCH POLY ALONG JOEL EAST BOULEVARD IN FORT
WORTH, TARRANT COUNTY.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH DECEMBER
6121 080.78550 4,175
PURCHASE REPLACEMENT ROLL UP DOOR FOR BOWIE SERVICE CENTER FOR
DETACHED STORAGE BUILDING. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER
6122 080.78556 4,462
PURCHASE NEW TRAILER FOR HAULING JOHN DEER GATOR FOR MCKINNEY
SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT SEPTEMBER
6123 080.78558 6,855
INSTALL 1,838 FEET OF 4 INCH POLY ALONG CRYSTAL FALLS PARKWAY IN
LEANDER. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL LEANDER GROWTH DECEMBER
6124 080.78559 22,477
INSTALL 250 FEET OF 2 INCH POLY ALONG THE STREETS OF PSW SUBDIVISION IN
PLANO. RESIDENTIAL PLANO GROWTH DECEMBER
6125 080.78560 4,841
INSTALL 1,026 FEET OF 4 INCH POLY ALONG KELLEY DRIVE IN GEORGETOWN,
WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL GEORGETOWN GROWTH DECEMBER
6126 080.78570 190,853
INSTALL 370 FEET OF 2 INCH AND 850 FEET OF 4 INCH POLY AND ABANDON 370
FEET OF 2 INCH, 850 FEET OF 4 INCH STEEL ALONG EAST OAK DRIVE IN HURST,
TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY DECEMBER
6127 080.78581 102,658
INSTALL 560 FEET OF 2 INCH POLY ALONG EAST RENFRO AND EAST ELLISON
STREET IN BURLESON AND ABANDON 1,120 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY DECEMBER
6128 080.78586 23,087
RELOCATE FACILITIES. INSTALL 135 FEET OF 2 INCH POLY ALONG HIGHWAY 82
AND TEXOMA PARKWAY IN SHERMAN AND ABANDON 2 INCH STEEL RISER AND
DOUBLE METER LOOP. ALL CUSTOMERS SHERMAN
RELOCATION OF
FACILITIES DECEMBER
6129 080.78588 3,229
PURCHASE 2 LOCATOR MARKER BALL GAS RYCOMM FOR GARLAND CENTRAL
FCC'S. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT SEPTEMBER
6130 080.78589 581,329
INSTALL 2,650 FEET OF 2 INCH POLY ALONG MCNEIL AND SCYENE IN DALLAS AND
ABANDON 2,650 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
6131 080.78595 7,583
RELOCATE FACILITIES. INSTALL 275 FEET OF 2 INCH POLY ALONG ENTERPRISE
WAY IN GREENVILLE AND ABANDON 17 FEET OF 2 INCH POLY. DEVELOPER
INSTALLED FACILITIES. ALL CUSTOMERS GREENVILLE
RELOCATION OF
FACILITIES DECEMBER
6132 080.78607 407
INSTALL 535 FEET OF 2 INCH POLY ALONG THE STREETS OF WILLOW BEND POLO
ESTATES SUBDIVISION IN PLANO, COLLIN COUNTY. RESIDENTIAL PLANO GROWTH DECEMBER
6133 080.78608 247,289
INSTALL 300 FEET OF 4 INCH AND 1,900 FEET OF 2 INCH POLY AND ABANDON 262
FEET OF 4 INCH, 6 FEET OF 3 INCH POLY AND 68 FEET OF 4 INCH, 1,333 FEET OF 3
INCH, 111 FEET OF 2 INCH STEEL ALONG THE INTERSECTION OF NORTH 10TH
STREET AND EAST IRVIN AVENUE IN TEMPLE, BELL COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER
6134 080.78609 26,452
INSTALL 1,285 FEET OF 6 INCH, 1,440 FEET OF 4 INCH AND 3,235 FEET OF 2 INCH
POLY ALONG THE STREETS OF LIBERTY HILLS SUBDIVISION IN FORT WORTH.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
6135 080.78613 465,892
INSTALL 955 FEET OF 4 INCH AND 1,400 FEET OF 2 INCH POLY AND ABANDON 940
FEET OF 6 INCH, 1,400 FEET OF 3 INCH STEEL AND 55 FEET OF 6 INCH POLY
ALONG THE ALLEY OF SHILOH AND MAYHEW IN DALLAS, DALLAS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
6136 080.78615 13,125 INSTALL 100 FEET OF 2 INCH POLY ALONG GREEN COURT IN ATHENS. RESIDENTIAL ATHENS GROWTH DECEMBER
6137 080.78618 61,137 INSTALL 540 FEET OF 2 INCH POLY ALONG THE SHAHAN DRIVE IN SHADY SHORES. RESIDENTIAL SHADY SHORES GROWTH DECEMBER
6138 080.78621 75,067
INSTALL 250 FEET OF 3 INCH, 250 FEET OF 2 INCH POLY AND ABANDON 250 FEET
OF 3 INCH, 250 FEET OF 2 INCH STEEL IN MOODY, MCLENNAN COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MOODY SYSTEM INTEGRITY DECEMBER
MTX Additions
Page 173 of 178
392
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
6139 080.78622 485,148
INSTALL 365 FEET OF 4 INCH AND 1,610 FEET OF 2 INCH POLY AND ABANDON 480
FEET OF 6 INCH AND 1,650 FEET OF 3 INCH STEEL ALONG THE ALLEY OF SHILOH
AND DUNAWAY IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
6140 080.78629 175,529
INSTALL 175 FEET OF 4 INCH, 850 FEET OF 2 INCH POLY ALONG KELLY BED IN
WAXAHACHIE, ELLIS COUNTY.
COMMERCIAL OR
INDUSTRIAL WAXAHACHIE GROWTH DECEMBER
6141 080.78630 24,590
INSTALL 750 FEET OF 4 INCH STEEL AND REGULATOR STATION IN FORT WORTH,
TARRANT COUNTY.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH DECEMBER
6142 080.78634 190,478
INSTALL 2,750 FEET OF 2 INCH, 1,040 FEET OF 4 INCH POLY ALONG THE STREETS
OF PLEASANT VALLEY SUBDIVISION IN WYLIE, COLLIN COUNTY. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL WYLIE GROWTH DECEMBER
6143 080.78647 34,618 INSTALL 100 FEET OF 2 INCH POLY ALONG SHADY GROVE ROAD IN KELLER. RESIDENTIAL KELLER GROWTH DECEMBER
6144 080.78648 38,108
INSTALL 190 FEET OF 2 INCH POLY ALONG NORTH CROCKETT STREET IN
FREDERICKSBURG, GILLESPIE COUNTY. RESIDENTIAL FREDERICKSBURG GROWTH DECEMBER
6145 080.78649 490,893
INSTALL 1,741 FEET OF 6 INCH, 60 FEET OF 2 INCH POLY AND ABANDON 680 FEET
OF 6 INCH, 200 FEET OF 4 INCH, AND 425 FEET OF 2 INCH STEEL ALONG PINE
STREET AND ANSON AVENUE IN ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
6146 080.78658 (16,904)
INSTALL 195 FEET OF 2 INCH POLY ALONG YAUPON STREET IN FREDERICKSBURG,
GILLESPIE COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FREDERICKSBURG GROWTH DECEMBER
6147 080.78659 162,234
RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY ALONG THOMPSON
DRIVE AND ABANDON 250 FEET OF 4 INCH STEEL IN RICHARDSON, DALLAS
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY DECEMBER
6148 080.78665 369,360
INSTALL 1,830 FEET OF 4 INCH, 4,795 FEET OF 2 INCH POLY ALONG THE STREETS
OF BAILEY PARK SUBDIVISION IN FORT WORTH, TARRANT COUNTY. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
6149 080.78668 202,786
INSTALL 930 FEET OF 2 INCH POLY AND ABANDON 632 FEET OF 2 INCH, 54 FEET OF
1.25 INCH STEEL AND 61 FEET OF 2 INCH AND 73 FEET OF 1.25 INCH POLY ALONG
WEST JOHNSON STREET IN DENISON, GRAYSON COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY DECEMBER
6150 080.78676 5,045
INSTALL 375 FEET OF 2 INCH POLY IN RIGHT OF WAY ON ASPEN COURT IN
WESTLAKE, TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WESTLAKE GROWTH DECEMBER
6151 080.78677 64,634
RELOCATE FACILITIES. INSTALL 175 FEET OF 4 INCH POLY ALONG ROOSEVELT
AVENUE AND ABANDON 165 FETE OF 4 INCH STEEL TO ACCOMODATE CITY ALLEY
PAVING PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
6152 080.78678 84,104
INSTALL 1,200 FEET OF 4 INCH POLY ALONG WEST WINTERGREEN RD AND NORTH
DUNCANVILLE RD IN DUNCANVILLE, DALLAS COUNTY.
COMMERCIAL OR
INDUSTRIAL DUNCANVILLE GROWTH DECEMBER
6153 080.78691 33,303
INSTALL 240 FEET OF 4 INCH POLY ALONG NORTH HWY 77 AND TRIUMPH IN
WAXAHACHIE, ELLIS COUNTY.
COMMERCIAL OR
INDUSTRIAL WAXAHACHIE GROWTH DECEMBER
6154 080.78697 654,132
RELOCATE FACILITIES.
INSTALL 1,665 FEET OF 2 INCH, 350 FEET OF 4 INCH POLY AND ABANDON 1,660
FEET OF 2 INCH, 200 FEET OF 3 INCH AND 150 FEET OF 4 INCH STEEL ALONG
HUGHES LANE IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
6155 080.78705 1,207,358
INSTALL 1,800 FEET OF 6 INCH POLY AND ABANDON 1,800 FEET OF 6 INCH STEEL
ALONG RIGHT OF WAY CROSSING BRAZOS RIVER AND LAKE SHORE DRIVE IN
WACO, MCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
6156 080.78708 2,648
INSTALL 200 FEET OF 2 INCH POLY ALONG SWEET STREET IN SOUTHLAKE,
TARRANT COUNTY. RESIDENTIAL SOUTHLAKE GROWTH DECEMBER
6157 080.78709 3,322
INSTALL 300 FEET OF 2 INCH POLY ALONG 4TH AND DEWITT IN SACHSE.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SACHSE GROWTH DECEMBER
6158 080.78713 406,559
INSTALL 1,255 FEET OF 2 INCH, 350 FEET OF 4 INCH, 1,295 FEET OF 6 INCH POLY
AND ABANDON 1,525 FEET OF 6 INCH STEEL ALONG HOUSTON AVENUE, AND MAIN
STREET IN TEMPLE, BELL COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER
6159 080.78720 521,040
INSTALL 2,760 FEET OF 6 INCH, 1,550 FEET OF 4 INCH, AND 8.970 FEET OF 2 INCH
POLY ALONG THE STREETS OF WALSH RANCH SUBDIVISION IN FORT WORTH,
TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
6160 080.78727 19,193
PURCHASE 12 ELECTROFUSION TOOLS, 1 GUILLOTINE, 1 12" PEELER, 2 TOP LOAD
CLAMPS, 2 LINE UP CLAMPS FOR ROUND ROCK SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT DECEMBER
6161 080.78728 8,797 INSTALL 220 FEET OF 2 INCH POLY ALONG BEATY ROAD IN SAN ANGELO. RESIDENTIAL SAN ANGELO GROWTH DECEMBER
6162 080.78732 18,057
INSTALL 240 FEET OF 2 INCH POLY ALONG JUPITER STREET IN GARLAND.
DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL GARLAND GROWTH DECEMBER
6163 080.78739 38,820
INSTALL 5 FEET OF 4 INCH NEAR THE INTERSECTION OF AVENUE A AND WEST
MULBERRY STREET IN DENTON AND ABANDON 5 FEET OF 4 INCH POLY. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER
6164 080.78741 94,917
INSTALL 17 FARM TAPS BETWEEN KC29 AND KC30 IN CLYDE AND ABANDON 17
FARM TAPS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS CLYDE SYSTEM INTEGRITY DECEMBER
6165 080.78744 15,050
INSTALL 5,086 FEET OF 2 INCH POLY ALONG THE STREETS OF COTTONWOOD
CREEK SUBDIVISION IN HUTTO, WILLIAMSON COUNTY. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL HUTTO GROWTH DECEMBER
6166 080.78757 532,139
INSTALL 165 FEET OF 12 INCH STEEL AND ABANDON 140 FEET OF 12 INCH STEEL
ALONG CHESTER AND MISSISSIPPI IN WICHITA FALLAS, WICHITA COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
6167 080.78769 1,543 PURCHASE OF DIGITAL GAUCE FOR COMPLIANCE IN WACO SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT DECEMBER
6168 080.78781 7,006
REPLACE RELIEF VALVE ON DISTRICT REGULATOR STATION #24 ALONG HIGHWAY
93 IN BELTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY DECEMBER
6169 080.78797 306,546
INSTALL 3,340 FEET OF 4 INCH, 4,215 FEET OF 2 INCH POLY ALONG THE STREETS
OF BRIDGEVIEW SUBDIVISION IN FORT WORTH, TARRANT COUNTY. DEVELOPER
INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
6170 080.78806 20,879
RELOCATE FACILITIES. INSTALL 371 FEET OF 2 INCH POLY ALONG GREGG STREET
AND ABANDON 48 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALVERT SYSTEM INTEGRITY SEPTEMBER
6171 080.78810 14,981
INSTALL 5 FEET OF 2 INCH POLY ALONG ELM STREET IN ALVORD AND ABANDON 5
FEET OF 2 INCH POLY ALL CUSTOMERS ALVORD SYSTEM INTEGRITY DECEMBER
6172 080.78823 84,534
RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH POLY AND ABANDON 500
FEET OF 2 INCH POLY ALONG ROE STREET AND CENTRAL DIRVE IN AZLE,
TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS AZLE SYSTEM INTEGRITY DECEMBER
6173 080.78825 121,554
INSTALL 2,300 FEET OF 4 INCH, 4,300 FEET OF 2 INCH POLY ALONG THE STREETS
OF ERIN HILLS AND OAK HILL IN RED OAK, ELLIS COUNTY. DEVELOPER INSTALLED
FACILITIES. RESIDENTIAL RED OAK GROWTH DECEMBER
6174 080.78831 130,697
INSTALL 524 FEET OF 2 INCH POLY AND ABANDON 277 FEET OF 2 INCH POLY AND
213 FEET OF 2 INCH AND 204 FEET OF 4 INCH STEEL ALONG SOUTH LANE STREET,
WEST SHOEMAKER AND WEST WARD IN DECATUR, WISE COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY DECEMBER
6175 080.78832 82,160
RELOCATE FACILITIES. INSTALL 520 FEET OF 2 INCH POLY AND ABANDON 315
FEET OF 2 INCH STEEL ALONG THE STREETS OF GRANDVIEW, JOHNSON COUNTY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANDVIEW SYSTEM INTEGRITY DECEMBER
6176 080.78847 17,190
PURCHASE PIPE AND CABLE LOCATOR FOR ATHENS COMPLIANCE, 2 MARKER
BALL LOCATOR FOR CORSICANA SERVICE CENTER, 2 FOOTAGE C400 FOR
GARLAND SERVICE CENTER, AND 2 PUMPS FOR SQEEZE TOOLS FOR GROESBECK
SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT DECEMBER
6177 080.78849 229,744
INSTALL ERCON MATTING TO REMEDIATE EXPOSURES ON XT6-3 AND XT6-5 IN
DESOTO, DALLAS COUNTY. ALL CUSTOMERS DESOTO PIPELINE INTEGRITY DECEMBER
6178 080.78865 121,778
INSTALL 2,135 FEET OF 2 INCH, 950 FEET OF 4 INCH, 500 FEET OF 6 INCH POLY
ALONG THE STREETS OF SOLTERRA SUBDIVISION IN MESQUITE, DALLAS COUNTY.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MESQUITE GROWTH DECEMBER
MTX Additions
Page 174 of 178
393
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
6179 080.78867 110,189
INSTALL 375 FEET OF 2 INCH POLY ALONG EAST 2ND STREET AND MAIN STREET
IN RHOME AND ABANDON 211 FEET OF 2 INCH, 126 FEET OF 4 INCH STEEL AND 8
FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS RHOME SYSTEM INTEGRITY DECEMBER
6180 080.78868 28,153
INSTALL TWO (2) AC UNITS AT ABILENE SERVICE CENTER ON ARNOLD
BOULEVARD AND ABANDON TWO (2) AC UNIT AT ABILENE SERVICE CENTER,
ABILENE, TAYLOR COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER
6181 080.78872 41,455 INSTALL 100 FEET OF 2 INCH POLY ALONG HATTIE STREET IN TERRELL. RESIDENTIAL TERRELL GROWTH DECEMBER
6182 080.78877 225,839
INSTALL 750 FEET OF 4 INCH POLY ALONG BAIRD STREET IN CLEBURNE AND
ABANDON 7870 FEET OF 4 INCH STEEL AND 130 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY DECEMBER
6183 080.78890 286,349
DALLAS PROJECT WORK NEEDED INCLUCING CONSTRUCTION, CABLING,
FURNITURE AND MISCELLANEOUS FOR 17TH AND 18TH FLOOR AT LINCOLN
CENTRE IN DALLAS, DALLAS COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER
6184 080.78892 280,592
INSTALL 550 FEET OF 4 INCH POLY ALONG NORTH MAIN STREET AND ABANDON
535 FEET OF 6 INCH STEEL IN PARIS, LAMAR COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY DECEMBER
6185 080.78895 10,236
INSTALL FLOWSAFE RELIEF VALVE AND ABANDON DEAD WEIGHT RELIEF VALVE
ON DISTRICT REGULATOR STATION DRS70 IN ABILENE, TAYLOR COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
6186 080.78896 7,082
INSTALL RELIEF VALVE AT BRYAN DISTRICT REGULATOR STATION DRS34 AT THE
INTERSECTION OF MILLS AND EAST 27TH STREET IN BRYAN, BRAZOS COUNTY AND
ABANDON RELIEF VALVE AT BRYAN DISTRICT REGULATOR STATION DRS34 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY DECEMBER
6187 080.78898 225,756
INSTALL DISTRICT REGULATOR STATION DRS03, 25 FEET OF 4 INCH, 25 FEET OF 2
INCH POLY NEAR THE INTERSECTION OF NORTH ALAMO STREET AND WEST BELL
STREET IN BARTLETT, BELL COUNTY AND ABANDON 10 FEET OF 3 INCH, 20 FEET
OF 4 INCH STEEL AND 3 FEET OF 3 INCH POLY AND DISTRICT REGULATOR STATION
DRS03 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BARTLETT SYSTEM INTEGRITY DECEMBER
6188 080.78906 160,216
INSTALL 900 FEET OF 4 INCH, 3,680 FEET OF 2 INCH POLY ALONG THE STREETS OF
NORTHSTAR SUBDIVISION IN FORT WORTH, TARRANT COUNTY. RESIDENTIAL FORT WORTH GROWTH DECEMBER
6189 080.78916 6,798
INSTALL GATE OPERATOR ON SOUTH (LEFT) GATE AT ATHEN SERVICE CENTER,
ATHENS, HENDERSON COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER
6190 080.78926 8,345
INSTALL A DAIKEN AC UNIT IN LARGE CONFERENCE ROOM AT WAXAHACHIE
SERVICE CENTER, WAXAHACHIE, ELLIS COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER
6191 080.78937 32,354
INSTALL 12 INCH SPLIT SLEEVE ALONG PHILLIP AND BANK STREET IN DALLAS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER
6192 080.78957 219,814
INSTALL 1,520 FEET OF 2 INCH, 110 FEET OF 4 INCH POLY ALONG NORTH RIDGE
ROAD, TEE HEAD DRIVE AND GREENFIELD ROAD IN FORT WORTH, TARRANT
COUNTY AND ABANDON 90 FEET OF 4 INCH, 415 FEET OF 2 INCH STEEL AND 825
FEET OF 2 INCH AND 180 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
6193 080.78966 4,278
INSTALL INTERCOM SYSTEM FOR FRONT DOOR AT CARROLLTON SERVICE
CENTER, CARROLLTON, DENTON COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER
6194 080.78971 160,750
RELOCATE FACILITIES. INSTALL 415 FEET OF 6 INCH AND 25 FEET OF 3 INCH
POLY AND ABANDON 360 FEET OF 6 INCH AND 90 FEET OF 4 INCH STEEL ALONG
THE RIGHT OF WAY OF NORTH PEARL STREET BETWEEN WEST 11TH AVENUE AND
WEST 10TH AVENUE IN BELTON, BELL COUNTY. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER
6195 080.78977 275,468
INSTALL 310 FEET OF 2 INCH, 1,712 FEET OF 4 INCH POLY ALONG EAST IRVIN,
EAST HOUSTON AVENUE, EAST FRENCH STREET IN TEMPLE, BELL COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER
6196 080.78978 316,802
INSTALL 1,730 FEET OF 2 INCH, 320 FEET OF 4 INCH POLY AND ABANDON 326 FEET
OF 3 INCH, 280 FEET OF 4 INCH POLY AND 617 FEET OF 4 INCH STEEL ALONG EAST
FRENCH AVENUE AND NORTH 4TH STREET IN TEMPLE, BELL COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY DECEMBER
6197 080.78979 229,417
INSTALL 950 FEET OF 2 INCH, 250 FEET OF 4 INCH POLY AND ABANDON 1,250 FEET
OF 2 INCH STEEL ALONG DOGWOOD TRAIL IN LANCASTER, DALLAS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY DECEMBER
6198 080.78981 264,149
INSTALL 1,600 FEET OF 4 INCH, 600 FEET OF 2 INCH POLY AND ABANDON 1,600
FEET OF 4 INCH, 500 FEET OF 4 INCH, 160 FEET OF 2 INCH STEEL ALONG COLLEGE
HILLS STREET IN SAN ANGELO, TOM GREEN COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY DECEMBER
6199 080.78983 82,252
INSTALL 418 FEET OF 2 INCH POLY AND ABANDON 368 FEET OF 2 INCH STEEL AND
50 FEET OF 2 INCH POLY IN ROCHESTER, HASKELL COUNTY. ALL CUSTOMERS ROCHESTER
RELOCATION OF
FACILITIES DECEMBER
6200 080.78992 162,616
RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG TOPHILL LANE
ALLEY AND ABANDON 900 FEET OF 3 INCH STEEL TO ACCOMODATE THE CITY OF
DALLAS ALLEY PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
6201 080.79000 252,247
RELOCATE FACILITIES. INSTALL 500 FEET OF 8 INCH POLY TO BE ROAD RIGHT OF
WAY AT WINDING MEADOWS AND CANYON MAPLE ROAD AND ABANDON 456 FEET
OF 8 INCH POLY IN NORTHLAKE, DENTON COUNTY. ALL CUSTOMERS NORTHLAKE
RELOCATION OF
FACILITIES DECEMBER
6202 080.79001 50,549
INSTALL 400 FEET OF 4 INCH POLY ALONG FM 91 AND 2379 AND ABANDON 400
FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ODELL SYSTEM INTEGRITY DECEMBER
6203 080.79002 33,947 INSTALL 1,500 FEET OF 2 INCH POLY IN OAK POINT, DENTON COUNTY.
COMMERCIAL OR
INDUSTRIAL DENTON GROWTH DECEMBER
6204 080.79004 71,708
INSTALL 400 FEET OF 4 INCH POLY ALONG SAINTSBURY DRIVE IN DALLAS, DALLAS
COUNTY. ALL CUSTOMERS DALLAS GROWTH DECEMBER
6205 080.79005 2,711
INSTALL 430 FEET OF 2 INCH POLY ALONG THE STREETS OF WOODBRIDGE
VILLAGE SUBDIVISION IN SACHSE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL SACHSE GROWTH DECEMBER
6206 080.79011 29,740
INSTALL 630 FEET OF 4 INCH POLY ALONG MEACHAM BOULEVARD IN FORT
WORTH, TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH DECEMBER
6207 080.79022 4,919 PURCHASE OF OFFICE FURNITURE FOR KERRVILLE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER
6208 080.79023 191,085
INSTALL 150 FEET OF 4 INCH POLY ALONG FM 664 AND UHL ROAD IN GLENN
HEIGHTS, ELLIS COUNTY.
COMMERCIAL OR
INDUSTRIAL GLENN HEIGHTS GROWTH DECEMBER
6209 080.79034 28,419
PURCHASE 2 SMART SENSIT CAL-360 STATIONS AND 5 SENSIT G2 LEAK
DETECTORS FOR ARLINGTON-IRVING SERVICE CENTERS. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT SEPTEMBER
6210 080.79037 13,351
INSTALL REMOTE TERMINAL UNIT, POWER, AND CONTROLS FOR SCADA
COMMUNICATION TO MONITOR PRESSURE ON THE NORTH EAST END OF ABILENE,
TAYLOR COUNTY, ALL CUSTOMERS ABILENE SYSTEM INTEGRITY DECEMBER
6211 080.79039 101,783
INSTALL 900 FEET OF 2 INCH POLY ALONG THE STREETS OF WESLEY COURTS IN
ABILENE, TAYLOR COUNTY. RESIDENTIAL ABILENE GROWTH DECEMBER
6212 080.79064 122,872
RELOCATE FACILITIES. RELOCATE TWENTY ONE .75 POLY SERVICES ALONG
ALLEY BETWEEN HUNTINGTON AND LAWLER IN GARLAND, DALLAS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY DECEMBER
6213 080.79065 26,187 INSTALL 150 FEET OF 4 INCH POLY ALONG CRESS GARDEN LANE IN FORNEY. RESIDENTIAL FORNEY GROWTH DECEMBER
6214 080.79068 (72,712)
INSTALL 169 FEET OF 6 INCH POLY AND 6 INCH FLOWSIC500 METER ALONG THE
STREETS OF FARMERSVILLE, COLLIN COUNTY.
COMMERCIAL OR
INDUSTRIAL FARMERSVILLE GROWTH DECEMBER
6215 080.79072 80,064
INSTALL 120 FEET OF 6 INCH POLY ALONG DUNCANVILLE ROAD IN DESOTO,
DALLAS COUNTY. ALL CUSTOMERS DESOTO GROWTH DECEMBER
6216 080.79073 21,711
INSTALL 70 FEET OF 4 INCH POLY ALONG ELM STREET IN MCKINNEY, COLLIN
COUNTY.
COMMERCIAL OR
INDUSTRIAL MCKINNEY GROWTH DECEMBER
6217 080.79077 4,949
INSTALL 406 FEET OF 2 INCH POLY ALONG GRAND AVENUE PARKWAY IN
PFLUGERVILLE, WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL PFLUGERVILLE GROWTH DECEMBER
6218 080.79081 7,302
INSTALL 285 FEET OF 2 INCH POLY ALONG MERLOT DRIVE IN GRAPEVINE,
TARRANT COUNTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL GRAPEVINE GROWTH DECEMBER
6219 080.79083 39,572
INSTALL 12 INCH SLEEVE ALONG PERRY AND BANK STREET IN DALLAS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
MTX Additions
Page 175 of 178
394
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
6220 080.79117 28,734
INSTALL 12 FEET OF 6 INCH POLY ALONG ALMA DRIVE AND ABADNON 8 FEET OF 6
INCH POLY TO ACCOMMODATE THE CITY OF PLANO SEWER AND STREET PROJECT
IN PLANO, COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY DECEMBER
6221 080.79126 864,781
INSTALL 2,281 FEET 6 INCH, 202 FEET 4 INCH, 814 FEET 2 INCH AND ABANDON
2,200 FEET 6 INCH, 160 FEET 3 INCH, 150 FEET 2 INCH STEEL AND 50 FEET 4 INCH,
50 FEET 1.25 INCH POLY ALONG AVENUE A AND 33RD STREET IN SNYDER,
SCURRY COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY DECEMBER
6222 080.79130 70,022
INSTALL 1,050 FEET OF 2 INCH POLY ALONG THE STREETS OF MT. ZION AND KEY
WAY IN MIDLOTHIAN, ELLIS COUNTY. RESIDENTIAL MIDLOTHIAN GROWTH DECEMBER
6223 080.79137 126,042
INSTALL DISTRICT REGULATOR STATION DRS06, 10 FEET OF 6 INCH, 80 FEET OF
2IN CH, AND 40 FEET OF 4 INCH POLY AND ABANDON 10 FEET OF 6 INCH, 10 FEET
OF 2 INCH, AND 40 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION
DRS06 AT INTERSECTION OF ELIZABETH BOULEVARD AND S RAUPE LANE IN
GRANBURY, HOOD COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY DECEMBER
6224 080.79150 138,330
INSTALL 600 FEET OF 2 INCH, 10 FEET OF 6 INCH POLY AND ABANDON 600 FEET
OF 2 INCH, 10 FEET OF 6 INCH STEEL ALONG GULF STREET IN CLARKSVILLE, RED
RIVER COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CLARKSVILLE SYSTEM INTEGRITY DECEMBER
6225 080.79156 17,482
INSTALL 50 FEET OF 2 INCH POLY ALONG COLE AND 6TH IN BELLEVUE AND
ABANDON 50 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELLEVUE SYSTEM INTEGRITY DECEMBER
6226 080.79159 238,734
INSTALL DISTRICT REGULATOR DRS06 AT THE INTERSECTION OF EAST OLIVER
AND NORTH SWENSON IN STAMFORD, JONES COUNTY AND ABANDON DISTRICT
REGULATOR STATION DRS06 IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY DECEMBER
6227 080.79161 15,312
INSTALL 100 FEET OF 2 INCH POLY ALONG BROKEN CREST DRIVE IN DESOTO,
DALLAS COUNTY. ALL CUSTOMERS DESOTO GROWTH DECEMBER
6228 080.79177 93,025
INSTALL 100 FEET OF 4 INCH POLY ALONG SH 31 IN CORSICANA, NAVARRO
COUNTY.
COMMERCIAL OR
INDUSTRIAL CORSICANA GROWTH DECEMBER
6229 080.79180 121,852
CASING DIG 2019-02 AT STATION 285+60 ON LINE CA(3RD). REPLACE CASING
VENTS ON BOTH SIDES IN AZLE, TARRANT COUNTY. ALL CUSTOMERS AZLE PIPELINE INTEGRITY DECEMBER
6230 080.79183 19,541
INSTALL 100 FEET OF 4 INCH POLY ALONG WEST LOOP 306 IN SAN ANGELO, TOM
GREEN COUNTY.
COMMERCIAL OR
INDUSTRIAL SAN ANGELO GROWTH DECEMBER
6231 080.79184 142,792
INSTALL 350 FEET OF 2 INCH POLY AND ABANDON 300 FEET OF 1.25 INCH POLY
ALONG ALAN D DALE CIRCLE IN DENTON, DENTON COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER
6232 080.79187 68,505
INSTALL 250 FEET OF 4 INCH POLY IN RIGHT OF WAY ON JOHNSON ROAD IN
KELLER, TARRANT COUNTY. ALL CUSTOMERS KELLER SYSTEM INTEGRITY DECEMBER
6233 080.79209 63,694
RELOCATE FACILITIES. INSTALL 550 FEET OF 2 INCH POLY AND ABANDON 550
FEET OF 2 INCH STEEL ALONG FRONT AND ELM STREET IN ARLINGTON, TARRANT
COUNTY TO ACCOMMODATE THE CITY OF ARLINGTON DRAINAGE AND PAVING
PLAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY DECEMBER
6234 080.79217 3,733
INSTALL 1,722 FEET OF 4 INCH POLY ALONG WILLIAMS DRIVE IN GEORGETOWN,
WILLIAMSON COUNTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR
INDUSTRIAL GEORGETOWN GROWTH DECEMBER
6235 080.79219 4,365
INSTALL 455 FEET OF 4 INCH POLY ALONG NEWSOME ROAD IN MESQUITE, DALLAS
COUNTY.
COMMERCIAL OR
INDUSTRIAL MESQUITE GROWTH DECEMBER
6236 080.79220 23,320
INSTALL SECURITY CARD ACCESS SYSTEM AT ARLINGTON SERVICE CENTER AND
ABANDON SECURITY CARD ACCESS SYSTEM AT ARLINGTON SERVICE CENTER,
ARLINGTON, TARRANT COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER
6237 080.79226 65,358
RELOCATE FACILITIES. INSTALL 690 FEET OF 2 INCH POLY AND ABANDON 580
FEET OF 2 INCH STEEL ALONG QUAIL TRAIL IN FORT WORTH, TARRANT COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
6238 080.79228 82,139
RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH, 60 FEET OF 4 INCH POLY AND
ABANDON 50 FEET OF 6 INCH AND 60 FEET OF 4 INCH STEEL ALONG NEWTON
DRIVE IN BURLESON, JOHNSON COUNTY TO ACCOMMODATE CITY OF BURLESON
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY DECEMBER
6239 080.79253 3,570
INSTALL DISTRICT REGULATOR STATION DRS07 RELIEF VALVE ALONG
INTERSECTION OF SOUTH AUSTIN AVENUE AND W FIFTH STREET IN
GEORGETOWN, WILLIAMSON COUNTY AND ABANDON DISTRICT REGULATOR
STATION DRS07 RELIEF VALVE IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY DECEMBER
6240 080.79276 2,788
PURCHASE 2 INCH - 6 INCH PEELER FOR ROCKWALL DISTRICT, ROCKWALL,
WILLIAMSON COUNTY. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT DECEMBER
6241 080.79280 215,851
INSTALL 1,380 FEET OF 2 INCH, 1,070 FEET OF 4 INCH POLY ALONG THE STREETS
OF THE STATION SUBDIVISION IN SACHSE, DALLAS COUNTY. RESIDENTIAL SACHSE GROWTH DECEMBER
6242 080.79288 846
INSTALL 235 FEET OF 4 INCH POLY AND ABANDON 235 FEET OF 4 INCH POLY
ALONG THE STREETS OF GREENWAY SUBDIVISION IN CELINA, COLLIN COUNTY. ALL CUSTOMERS CELINA
RELOCATION OF
FACILITIES DECEMBER
6243 080.79331 28,932
PURCHASE FOUR (4) LOCATOR EQUIPMENT FOR DALLAS SERVICE CENTER,
DALLAS, DALLAS COUNTY. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT DECEMBER
6244 080.79371 629,660
CAPITAL REMEDIATION LINE CUT OUT ON LINE C16(EAST)AND STOPPLEING
REQUIRED TO COMPLETE THE CUT OUT IN IRVING, DALLAS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY DECEMBER
6245 080.79374 180,797
RELOCATE FACILITIES. INSTALL 1,070 FEET OF 4 INCH POLY AND ABANDON 1,070
FEET OF 2 INCH STEEL ALONG THE STREETS OF FORT WORTH TO ACCOMODATE
CITY OF FORT WORTH SANITARY SEWER PROJECT IN FORT WORTH, TARRANT
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY DECEMBER
6246 080.79388 40,569
INSTALL 330 FEET OF 4 INCH POLY ALONG INDEPENDENCE PARKWAY IN PLANO,
COLLIN COUNTY AND ABANDON 330 FEET OF 4 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY DECEMBER
6247 080.79409 92,098
INSTALL 2,600 FEET OF 2 INCH POLY ALONG THE STREETS OF HARVEST PHASE
SUBDIVISION IN NORTHLAKE, DENTON COUNTY. RESIDENTIAL NORTHLAKE GROWTH DECEMBER
6248 080.79411 637,538
INSTALL 1,900 FEET OF 8 INCH, 600 FEET OF 4 INCH AND 120 FEET OF 2 INCH POLY
AND ABANDON 845 FEET OF 6 INCH, 80 FEET OF 3 INCH STEEL AND 60 FEET OF 6
INCH, 1,000 FEET OF 4 INCH, 80 FEET OF 2 INCH POLY ALONG COLLEGE HILL
BOULEVARD IN SAN ANGELO IN TOM GREEN COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY DECEMBER
6249 080.79421 13,031
INSTALL 100 FEET OF 2 INCH POLY ALONG SOUTH MONROE STREET IN CAMPBELL,
HUNT COUNTY. RESIDENTIAL CAMPBELL GROWTH DECEMBER
6250 080.79424 236,141
INSTALL 1,125 FEET OF 2 INCH POLY AND ABANDON 1,420 FEET OF 2 INCH STEEL
ALONG VALENCIA IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
6251 080.79433 8,893
INSTALL 900 FEET OF 4 INCH POLY ALONG THE STREETS OF VICTORY AT
BASSWOOD IN FORT WORTH, TARRANT COUNTY. DEVELOPER INSTALLED
FACILITIES.
COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH DECEMBER
6252 080.79440 123,182
INSTALL 338 FEET OF 6 INCH AND 97 FEET OF 4 INCH POLY AND ABANDON 338
FEET OF 6 INCH POLY AND 98 FEET OF 4 INCH POLY ALONG WASHINGTON AVENUE
IN BRYAN, BRAZOS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY DECEMBER
6253 080.79446 65,372
INSTALL 100 FEET OF 2 INCH POLY ALONG SOUTH CENTER IN ARLINGTON,
TARRANT COUNTY.
COMMERCIAL OR
INDUSTRIAL ARLINGTON GROWTH DECEMBER
6254 080.79485 7,605
INSTALL RELIEF VALVE ON DISTRICT REGULATOR STATION DRS21 AT THE
INTERSECTION OF WILLOW AND NORTH JACKSON IN SAN ANGELO, TOM BEAN
COUNTY AND ABANDON RELIEF VALVE ON DISTRICT REGULATOR STATION DRS21
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY DECEMBER
6255 080.79489 3,016
INSTALL 90 FEET OF 2 INCH POLY ALONG THE STREETS OF HASKELL, HASKELL
COUNTY. RESIDENTIAL HASKELL GROWTH DECEMBER
6256 080.79518 27,803
INSTALL 130 FEET OF 4 INCH POLY ALONG LOGAN DRIVE IN MANSFIELD, TARRANT
COUNTY. ALL CUSTOMERS MANSFIELD
SYSTEM
IMPROVEMENT DECEMBER
MTX Additions
Page 176 of 178
395
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
6257 080.79519 16,908
PURCHASE OF PRESSURE RECORDING EQUIPMENT FOR DISTRICT REGULATOR
STATION PROJECT IN ROGERS, BELL COUNTY. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT DECEMBER
6258 080.79524 35,336
INSTALL 80 FEET OF 4 INCH POLY ALONG DOWNTOWN STREET OF ABILENE,
TAYLOR COUNTY.
COMMERCIAL OR
INDUSTRIAL ABILENE GROWTH DECEMBER
6259 080.79529 65,727
INSTALL DISTRICT REGULATOR STATION DRS05, 80 FEET OF 4 INCH AND 40 FEET
OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS05, 40 FEET
OF 3 INCH STEEL, 40 FEET OF 2 INCH AND 40 FEET OF 3 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY DECEMBER
6260 080.79546 64,469
INSTALL 350 FEET OF 4 INCH POLY AND ABANDON 350 FEET OF 4 INCH POLY
ALONG ENTERPRISE STREET IN ATHENS, HENDERSON COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY DECEMBER
6261 080.79551 33,894
INSTALL 173 FEET OF 4 INCH POLY ALONG VALLEY VIEW DRIVE IN KERRVILL, KERR
COUNTY. RESIDENTIAL KERRVILLE GROWTH DECEMBER
6262 080.79553 230,837
INSTALL ADDITIONAL CONCRETE PAVING AT ROUND ROCK WAREHOUSE ALONG
CHISOLM TRAIL, ROUND ROCK, WILLIAMSON COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER
6263 080.79557 98,166
INSTALL 600 FEET OF 2 INCH POLY AND 120 FEET OF 4 INCH STEEL AND ABANDON
110 FEET OF 2 INCH POLY AND 490 FEET OF 2 INCH STEEL ALONG EARLY
BOULEVARD IN EARLY, BROWN COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EARLY SYSTEM INTEGRITY DECEMBER
6264 080.79565 105,371
INSTALL 440 FEET OF 4 INCH, 10 FEET OF 2 INCH POLY AND ABANDON 440 FEET OF
6 INCH, 5 FEET OF 2 INCH STEEL ALONG MESQUITE STREET IN COLEMAN,
COLEMAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY DECEMBER
6265 080.79573 61,896
INSTALL 250 FEET OF 2 INCH POLY ALONG WHITLEY ROAD IN WATAUGA, TARRANT
COUNTY. RESIDENTIAL WATAUGA GROWTH DECEMBER
6266 080.79575 97,958
INSTALL 500 FEET OF 4 INCH, 120 FEET OF 2 INCH, 20 FEET OF 1.25 INCH POLY AND
ABANDON 500 FEET OF 8 INCH, 120 FEET OF 2 INCH AND 20 FEET OF 1.25 INCH
STEEL ALONG 11TH STREET IN CARLSBAD, TOM GREEN COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARLSBAD SYSTEM INTEGRITY DECEMBER
6267 080.79617 107,398
INSTALL DISTRICT REGULATOR STATION DRS06 AND 40 FEET OF 2 INCH, 120 FEET
OF 4 INCH POLY AND NEW HIGH FLOW STATION 2X4 STATION AND ABANDON 20
FEET OF 3 INCH, 55 FEET OF 4 INCH STEEL AND 65 FEET OF 4 INCH POLY AND
DISTRICT REGULATOR STATION DRS06 ALONG EAST 6TH STREET AND CEDAR
STREET IN COLORADO CITY, MITCHELL COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLORADO CITY SYSTEM INTEGRITY DECEMBER
6268 080.79655 13,490
INSTALL 325 FEET OF 2 INCH POLY AND ABANDON 80 FEET OF 3 INCH, 240 FEET OF
2 INCH STEEL ALONG 1ST STREET IN MILES, RUNNELS COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILES SYSTEM INTEGRITY DECEMBER
6269 080.79657 5,458
INSTALL 900 FEET OF 4 INCH, 300 FEET OF 2 INCH POLY ALONG SH 114 IN
GRAPEVINE, TARRANT COUNTY.
COMMERCIAL OR
INDUSTRIAL GRAPEVINE GROWTH DECEMBER
6270 080.79694 9,068
PURCHASE PRESSURE RECORDING DEVICES FOR WEST LP DISTRICT REGULATOR
STATION 01 AND MARLIN LP DISTRICT REGULATOR STATION 01 IN MARLIN, FALLS
COUNTY. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT DECEMBER
6271 080.79704 5,325
INSTALL 4 INCH VALVE LOCATED AT WICHITA FALLS WEST CITY GATE ALONG
SEYMOUR HIGHWAY IN WICHITA FALLS, WICHITA COUNTY AND ABANDON EMR-107
VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY DECEMBER
6272 080.79706 170,742
INSTALL 880 FEET OF 6 INCH, 120 FEET OF 2 INCH, 80 FEET OF 4 INCH POLY AND
ABANDON 860 FEET OF 6 INCH, 120 FEET OF 2 INCH STEEL ALONG PAINT ROCK
ROAD IN SAN ANGELO, TOM GREEN COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY DECEMBER
6273 080.79727 40,606
INSTALL 40 FEET OF 4 INCH, 10 FEET OF 2 INCH POLY AND ABANDON 40 FEET OF 4
INCH, 10 FEET OF 2 INCH STEEL ALONG THE STREETS OF CISCO IN CISCO,
EASTLAND COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY DECEMBER
6274 80.79731 144,327
INSTALL 2 STOPPLES AND 5 FEET OF 10-INCH STEEL MAIN NEAR ALVARADO TO
ELIMINATE LEAK ON LINE M IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS ALVARADO SYSTEM INTEGRITY DECEMBER
6275 080.79744 84,058
INSTALL 400 FEET OF 4 INCH, 100 FEET OF 6 INCH POLY AND ABANDON 400 FEET
OF 3 INCH, 100 FEET OF 6 INCH STEEL IN ALLEY SOUTH OF 6TH AT ELBERT STREET
IN QUANAH, HARDEMAN COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY DECEMBER
6276 080.79772 2,835 PUCHASE PLOTTER FOR DENTON SERVICE CENTER IN DENTON, DENTON COUNTY. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT DECEMBER
6277 080.79781 90,821
INSTALL 20 FEET OF 4 INCH, 170 FEET OF 2 INCH POLY AND ABANDON 20 FEET OF
4 INCH AND 170 FEET OF 2 INCH STEEL ALONG THE STREETS OF DE LEON,
COMANCHE COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209. ALL CUSTOMERS DE LEON SYSTEM INTEGRITY DECEMBER
6278 080.79808 16,245
INSTALL 100 FEET OF 2 INCH POLY ALONG MILL RUN ROAD IN ATHENS,
HENDERSON COUNTY. RESIDENTIAL ATHENS GROWTH DECEMBER
6279 080.79824 4,256
INSTALL 60 FEET OF 6 INCH POLY ALONG EASEMENT EAST OF STERLITE STREET
IN ENNIS, ELLIS COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ENNIS GROWTH DECEMBER
6280 080.79842 180
INSTALL 5 FEET OF 2 INCH POLY AND ABANDON 85 FEET OF 2 INCH STEEL ALONG
AVENUE C IN DENTON, DENTON COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROSS ROADS SYSTEM INTEGRITY DECEMBER
6281 080.79846 161,567
INSTALL DISTRICT REGLATOR STATION DRS38, NEW REGULATOR AND RELIEF
VALVE, AND 25 FEET OF 2 INCH, 25 FEET OF 4 INCH POLY AND ABANDON DISTRICT
REGULATOR STATION DRS38 AT INTERSECTION OF GURLEY AVENUE AND SOUTH
21ST STREET IN WACO, MCCLENNAN COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY DECEMBER
6282 080.79851 22,630
INSTALL 405 FEET OF 2 INCH POLY ALONG SHELTON DRIVE IN FORT WORTH,
TARRANT COUNTY. RESIDENTIAL FORT WORTH GROWTH DECEMBER
6283 080.79856 579,770
INSTALL 80 FEET OF 6 INCH POLY AND ABANDON 50 FEET OF 6 INCH POLY, 15
FEET OF 6 INCH STEEL ALONG OAK STREET IN DENTON, DENTON COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY DECEMBER
6284 080.79865 1,329
PURCHASE VALVE CHANGE WITH RUBBER 3/4 PLCS., VALVE CHANGER TOP DRIVE
NUT 3/4 PLCS, AND STUFFING BOX 1/2-3/4 VALVE CHANGER PLACES FOR
MESQUITE SERVICE CENTER, DALLAS COUNTY. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT DECEMBER
6285 080.79901 24,174
INSTALL 5 FEET OF 2 INCH POLY AND ABANDON 5 FEET OF 2 INCH POLY ALONG
SOUTH MAIN STREET IN RHOME, WISE COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RHOME SYSTEM INTEGRITY DECEMBER
6286 080.79933 564,098
INSTALL COMPOSITE REPAIR SLEEVES ON LINE D (D9 JCT TO D1 JCT) DIG 2019-025
(STA. 4181+70), DIG 2019-025B (STA. 4181+87), AND DIG 2019-025C (STA. 4176+88) IN
DALLAS, DALLAS COUNTY. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
6287 080.79938 2,934
INSTALL 10 INCH SPLIT SLEEVE ALONG GOODWIN AT DELMAR IN DALLAS, DALLAS
COUNTY AND ABANDON SERVICE TAP IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY DECEMBER
6288 080.79944 22,814
INSTALL 624 FEET OF 2 INCH POLY ALONG FM 148 IN CRANDALL, KAUFMAN
COUNTY. ALL CUSTOMERS CRANDALL GROWTH DECEMBER
6289 080.79963 22,413
INSTALL 170 FEET OF 2 INCH POLY ALONG WEISENBERGER AVENUE IN FORT
WORTH, TARRANT COUNTY. RESIDENTIAL FORT WORTH GROWTH DECEMBER
6290 080.79982 19,687
INSTALL 200 FEET OF 2 INCH POLY ALONG I-35 AND OVILLA ROAD IN RED OAK,
ELLIS COUNTY.
COMMERCIAL OR
INDUSTRIAL RED OAK GROWTH DECEMBER
6291 080.80084 58,602
INSTALL 50 FEET OF 2 INCH POLY AND ABANDON 40 FEET OF 2 INCH POLY ALONG
JOHN KENNEDY AT LEATHERHEAD IN SAGINAW, TARRANT COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY DECEMBER
6292 080.80088 47,880
INSTALL CONNECTING CONCRETE DRIVEWAY FROM SIDE EXIT TO FRONT
ENTRANCE AT HILLSBORO SERVICE CENTER IN HUBBARD, HILL COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER
6293 080.80121 2,439
INSTALL A NEW BARCO UNIT AT DENTON SERVICE CENTER, DENTON, DENTON
COUNTY. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - IT DECEMBER
6294 080.80169 1,617
INSTALL 5 FEET OF 2 INCH POLY AND ABANDON 5 FEET OF 2 INCH POLY ALONG
HOUSTON STREET IN TERRELL, KAUFMAN COUNTY. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY DECEMBER
6295 080.80174 256,851
INSTALL 250 FEET OF 6 INCH, 5 FEET OF 4 INCH, 65 FEET OF 2 INCH POLY ALONG
GREGG STREET AND HAYNES STREET IN DENTON, DENTON COUNTY. ALL CUSTOMERS DENTON
SYSTEM
IMPROVEMENT DECEMBER
6296 080.80302 57,374
PURCHASE EIGHT (8) LOCATOR EQUIPMENT FOR DALLAS SERVICE CENTER,
DALLAS, DALLAS COUNTY. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT -
EQUIPMENT DECEMBER
MTX Additions
Page 177 of 178
396
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
(2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
6297 080.80369 5,124
INSTALL GAINESVILLE SERVICE CENTER SIGN IN GAINESVILLE, COOKE COUNTY
AND ABANDON GAINESVILLE SERVICE CENTER SIGN. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER
6298 080.80448 13,437
INSTALL ONE (1) AC UNIT IN ABILENE SERVICE CENTER IN ABILENE, TAYLOR
COUNTY AND ABANDON ONE (1) AC UNIT IN ABILENE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES DECEMBER
6299
TOTAL MTX
ADDITIONS
(LN. 1 - LN. 6298) 1,063,846,551
6300
6301
6302 NOTES:
6303 (1) The "COST" column reflects the capitalized portion of the cost only.
6304 (2) The "DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CALENDAR YEAR 2022" column describes capitalized costs only.
MTX Additions
Page 178 of 178
397
Item 10.
ATMOS ENERGY CORP.,
MID-TEX DIVISION
INTERIM RATE ADJUSTMENT
APPLICATION
PROJECT REPORT 2022
ADDITIONS
BY FERC ACCOUNT
398
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.33345 38000 0
080 190 - Mid-Tex Gas Division Addition 080.33346 38000 0
080 190 - Mid-Tex Gas Division Addition 080.33347 38000 873
080 190 - Mid-Tex Gas Division Addition 080.33348 38000 1
080 190 - Mid-Tex Gas Division Addition 080.33349 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.33349 38000 0
080 190 - Mid-Tex Gas Division Addition 080.33350 38000 0
080 190 - Mid-Tex Gas Division Addition 080.33351 38000 0
080 190 - Mid-Tex Gas Division Addition 080.33352 38000 0
080 190 - Mid-Tex Gas Division Addition 080.33353 37602 0
080 190 - Mid-Tex Gas Division Addition 080.33354 37602 0
080 190 - Mid-Tex Gas Division Addition 080.33355 37602 0
080 190 - Mid-Tex Gas Division Addition 080.33356 37602 0
080 190 - Mid-Tex Gas Division Addition 080.33357 37602 0
080 190 - Mid-Tex Gas Division Addition 080.33358 37602 63
080 190 - Mid-Tex Gas Division Addition 080.33359 37601 0
080 190 - Mid-Tex Gas Division Addition 080.33359 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.33360 37602 0
080 190 - Mid-Tex Gas Division Addition 080.33487 37602 711
080 190 - Mid-Tex Gas Division Addition 080.33487 38000 115
080 190 - Mid-Tex Gas Division Addition 080.33492 37602 201
080 190 - Mid-Tex Gas Division Addition 080.33492 38000 35
080 190 - Mid-Tex Gas Division Addition 080.33502 37602 234
080 190 - Mid-Tex Gas Division Addition 080.33506 37601 98
080 190 - Mid-Tex Gas Division Addition 080.33507 37602 133
080 190 - Mid-Tex Gas Division Addition 080.33513 37602 15
080 190 - Mid-Tex Gas Division Addition 080.33513 38000 1
080 190 - Mid-Tex Gas Division Addition 080.33519 37602 5
080 190 - Mid-Tex Gas Division Addition 080.33519 38000 0
080 190 - Mid-Tex Gas Division Addition 080.33520 37601 252
080 190 - Mid-Tex Gas Division Addition 080.33520 38000 1
080 190 - Mid-Tex Gas Division Addition 080.33546 37602 132
080 190 - Mid-Tex Gas Division Addition 080.33546 38000 247
080 190 - Mid-Tex Gas Division Addition 080.33548 37602 36
080 190 - Mid-Tex Gas Division Addition 080.33548 38000 142
080 190 - Mid-Tex Gas Division Addition 080.33561 37601 2,995
080 190 - Mid-Tex Gas Division Addition 080.33604 37602 277
080 190 - Mid-Tex Gas Division Addition 080.33604 38000 72
080 190 - Mid-Tex Gas Division Addition 080.33654 37602 368
080 190 - Mid-Tex Gas Division Addition 080.33662 37602 16
080 190 - Mid-Tex Gas Division Addition 080.33663 37602 15
080 190 - Mid-Tex Gas Division Addition 080.33676 37602 75
080 190 - Mid-Tex Gas Division Addition 080.33676 38000 31
080 190 - Mid-Tex Gas Division Addition 080.33726 37602 279
080 190 - Mid-Tex Gas Division Addition 080.33726 38000 7
080 190 - Mid-Tex Gas Division Addition 080.33733 37602 62
080 190 - Mid-Tex Gas Division Addition 080.33733 38000 16
080 190 - Mid-Tex Gas Division Addition 080.33734 37602 58
080 190 - Mid-Tex Gas Division Addition 080.33734 38000 21
080 190 - Mid-Tex Gas Division Addition 080.33735 37602 59
080 190 - Mid-Tex Gas Division Addition 080.33735 38000 6
080 190 - Mid-Tex Gas Division Addition 080.33742 37602 807
080 190 - Mid-Tex Gas Division Addition 080.33742 38000 11
080 190 - Mid-Tex Gas Division Addition 080.33746 37602 21
080 190 - Mid-Tex Gas Division Addition 080.33746 38000 1
080 190 - Mid-Tex Gas Division Addition 080.33776 37602 60
080 190 - Mid-Tex Gas Division Addition 080.33798 37601 597
080 190 - Mid-Tex Gas Division Addition 080.33801 37602 21
080 190 - Mid-Tex Gas Division Addition 080.33801 38000 3
080 190 - Mid-Tex Gas Division Addition 080.33840 37602 29
080 190 - Mid-Tex Gas Division Addition 080.33842 37602 377
080 190 - Mid-Tex Gas Division Addition 080.33844 37602 111
080 190 - Mid-Tex Gas Division Addition 080.33844 38000 18
080 190 - Mid-Tex Gas Division Addition 080.33849 37601 311
080 190 - Mid-Tex Gas Division Addition 080.33870 37602 40
080 190 - Mid-Tex Gas Division Addition 080.33900 37602 240
080 190 - Mid-Tex Gas Division Addition 080.33900 38000 52
080 190 - Mid-Tex Gas Division Addition 080.33906 37602 18
080 190 - Mid-Tex Gas Division Addition 080.33907 37602 111
080 190 - Mid-Tex Gas Division Addition 080.33907 38000 106
080 190 - Mid-Tex Gas Division Addition 080.33909 37602 334
080 190 - Mid-Tex Gas Division Addition 080.33909 38000 11
080 190 - Mid-Tex Gas Division Addition 080.33951 37602 102
080 190 - Mid-Tex Gas Division Addition 080.33951 38000 17
080 190 - Mid-Tex Gas Division Addition 080.33979 37602 283
080 190 - Mid-Tex Gas Division Addition 080.33981 37602 32
080 190 - Mid-Tex Gas Division Addition 080.34037 37602 113
080 190 - Mid-Tex Gas Division Addition 080.34048 37602 17
080 190 - Mid-Tex Gas Division Addition 080.34070 37602 85
080 190 - Mid-Tex Gas Division Addition 080.34087 37602 55
080 190 - Mid-Tex Gas Division Addition 080.34087 38000 16
080 190 - Mid-Tex Gas Division Addition 080.34091 37602 281
080 190 - Mid-Tex Gas Division Addition 080.34091 38000 14
080 190 - Mid-Tex Gas Division Addition 080.34136 37602 56
080 190 - Mid-Tex Gas Division Addition 080.34136 38000 11
080 190 - Mid-Tex Gas Division Addition 080.34137 37602 21
080 190 - Mid-Tex Gas Division Addition 080.34143 37602 270
080 190 - Mid-Tex Gas Division Addition 080.34143 38000 110
080 190 - Mid-Tex Gas Division Addition 080.34146 37602 273
080 190 - Mid-Tex Gas Division Addition 080.34175 37602 322
080 190 - Mid-Tex Gas Division Addition 080.34175 38000 10
080 190 - Mid-Tex Gas Division Addition 080.34176 37602 138
080 190 - Mid-Tex Gas Division Addition 080.34176 38000 21
080 190 - Mid-Tex Gas Division Addition 080.34177 37602 259
080 190 - Mid-Tex Gas Division Addition 080.34177 38000 368
080 190 - Mid-Tex Gas Division Addition 080.34187 37602 186
080 190 - Mid-Tex Gas Division Addition 080.34187 38000 100
080 190 - Mid-Tex Gas Division Addition 080.34188 37602 1,359
080 190 - Mid-Tex Gas Division Addition 080.34188 38000 49
080 190 - Mid-Tex Gas Division Addition 080.34208 37602 680
080 190 - Mid-Tex Gas Division Addition 080.34210 37602 216
080 190 - Mid-Tex Gas Division Addition 080.34210 38000 23
080 190 - Mid-Tex Gas Division Addition 080.34228 37602 583
080 190 - Mid-Tex Gas Division Addition 080.34251 37602 66
080 190 - Mid-Tex Gas Division Addition 080.34251 38000 6
080 190 - Mid-Tex Gas Division Addition 080.34286 37602 130
080 190 - Mid-Tex Gas Division Addition 080.34286 38000 22
MTX Additions by FERC
Page 1 of 101
399
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.34294 37602 733
080 190 - Mid-Tex Gas Division Addition 080.34294 38000 53
080 190 - Mid-Tex Gas Division Addition 080.34320 37602 33
080 190 - Mid-Tex Gas Division Addition 080.34326 37601 210
080 190 - Mid-Tex Gas Division Addition 080.34395 37602 109
080 190 - Mid-Tex Gas Division Addition 080.34402 37601 205
080 190 - Mid-Tex Gas Division Addition 080.34402 38000 1
080 190 - Mid-Tex Gas Division Addition 080.34403 37601 151
080 190 - Mid-Tex Gas Division Addition 080.34417 37602 240
080 190 - Mid-Tex Gas Division Addition 080.34432 37602 305
080 190 - Mid-Tex Gas Division Addition 080.34470 37602 82
080 190 - Mid-Tex Gas Division Addition 080.34491 37602 96
080 190 - Mid-Tex Gas Division Addition 080.34502 37602 440
080 190 - Mid-Tex Gas Division Addition 080.34502 38000 122
080 190 - Mid-Tex Gas Division Addition 080.34508 37602 65
080 190 - Mid-Tex Gas Division Addition 080.34520 37602 395
080 190 - Mid-Tex Gas Division Addition 080.34520 38000 103
080 190 - Mid-Tex Gas Division Addition 080.34532 37602 20
080 190 - Mid-Tex Gas Division Addition 080.34532 38000 11
080 190 - Mid-Tex Gas Division Addition 080.34543 37602 62
080 190 - Mid-Tex Gas Division Addition 080.34543 38000 12
080 190 - Mid-Tex Gas Division Addition 080.34555 37602 112
080 190 - Mid-Tex Gas Division Addition 080.34555 38000 15
080 190 - Mid-Tex Gas Division Addition 080.34560 37602 617
080 190 - Mid-Tex Gas Division Addition 080.34562 37602 204
080 190 - Mid-Tex Gas Division Addition 080.34579 37602 295
080 190 - Mid-Tex Gas Division Addition 080.34579 38000 65
080 190 - Mid-Tex Gas Division Addition 080.34704 37602 12
080 190 - Mid-Tex Gas Division Addition 080.34729 37602 53
080 190 - Mid-Tex Gas Division Addition 080.34737 37602 672
080 190 - Mid-Tex Gas Division Addition 080.34741 37602 9
080 190 - Mid-Tex Gas Division Addition 080.34741 38000 0
080 190 - Mid-Tex Gas Division Addition 080.34745 37602 79
080 190 - Mid-Tex Gas Division Addition 080.34745 38000 29
080 190 - Mid-Tex Gas Division Addition 080.34747 37602 153
080 190 - Mid-Tex Gas Division Addition 080.34753 37601 112
080 190 - Mid-Tex Gas Division Addition 080.34776 37602 7
080 190 - Mid-Tex Gas Division Addition 080.34785 37602 75
080 190 - Mid-Tex Gas Division Addition 080.34785 38000 6
080 190 - Mid-Tex Gas Division Addition 080.34862 37602 138
080 190 - Mid-Tex Gas Division Addition 080.34866 37602 123
080 190 - Mid-Tex Gas Division Addition 080.34881 37602 307
080 190 - Mid-Tex Gas Division Addition 080.34960 37601 166
080 190 - Mid-Tex Gas Division Addition 080.34982 37602 146
080 190 - Mid-Tex Gas Division Addition 080.34982 38000 39
080 190 - Mid-Tex Gas Division Addition 080.34994 37602 555
080 190 - Mid-Tex Gas Division Addition 080.34994 38000 35
080 190 - Mid-Tex Gas Division Addition 080.34998 37602 134
080 190 - Mid-Tex Gas Division Addition 080.35032 37602 219
080 190 - Mid-Tex Gas Division Addition 080.35156 37602 82
080 190 - Mid-Tex Gas Division Addition 080.35164 37602 37
080 190 - Mid-Tex Gas Division Addition 080.35164 38000 16
080 190 - Mid-Tex Gas Division Addition 080.35180 38000 5
080 190 - Mid-Tex Gas Division Addition 080.35242 37602 4
080 190 - Mid-Tex Gas Division Addition 080.35242 38000 16
080 190 - Mid-Tex Gas Division Addition 080.35255 37602 62
080 190 - Mid-Tex Gas Division Addition 080.38117 37602 0
080 190 - Mid-Tex Gas Division Addition 080.38117 38000 0
080 190 - Mid-Tex Gas Division Addition 080.41066 37601 2,558
080 190 - Mid-Tex Gas Division Addition 080.41157 38000 (312)
080 190 - Mid-Tex Gas Division Addition 080.41874 37601 0
080 190 - Mid-Tex Gas Division Addition 080.41874 37602 0
080 190 - Mid-Tex Gas Division Addition 080.41874 38000 0
080 190 - Mid-Tex Gas Division Addition 080.43732 37602 161
080 190 - Mid-Tex Gas Division Addition 080.43732 38000 9
080 190 - Mid-Tex Gas Division Addition 080.45245 37602 0
080 190 - Mid-Tex Gas Division Addition 080.45245 38000 0
080 190 - Mid-Tex Gas Division Addition 080.45509 37601 (0)
080 190 - Mid-Tex Gas Division Addition 080.45614 37602 0
080 190 - Mid-Tex Gas Division Addition 080.45614 38000 0
080 190 - Mid-Tex Gas Division Addition 080.45638 37601 (46,459)
080 190 - Mid-Tex Gas Division Addition 080.45638 37800 (536)
080 190 - Mid-Tex Gas Division Addition 080.45658 37601 2
080 190 - Mid-Tex Gas Division Addition 080.45700 37602 1
080 190 - Mid-Tex Gas Division Addition 080.45700 38000 1
080 190 - Mid-Tex Gas Division Addition 080.46065 37602 1
080 190 - Mid-Tex Gas Division Addition 080.46065 38000 0
080 190 - Mid-Tex Gas Division Addition 080.46065 38100 0
080 190 - Mid-Tex Gas Division Addition 080.46065 38200 0
080 190 - Mid-Tex Gas Division Addition 080.46065 38300 0
080 190 - Mid-Tex Gas Division Addition 080.46146 37602 4
080 190 - Mid-Tex Gas Division Addition 080.46146 38000 0
080 190 - Mid-Tex Gas Division Addition 080.46146 38100 0
080 190 - Mid-Tex Gas Division Addition 080.46146 38200 0
080 190 - Mid-Tex Gas Division Addition 080.46146 38300 0
080 190 - Mid-Tex Gas Division Addition 080.46447 37601 5,766
080 190 - Mid-Tex Gas Division Addition 080.47046 37602 11,859
080 190 - Mid-Tex Gas Division Addition 080.47046 38000 120
080 190 - Mid-Tex Gas Division Addition 080.47061 37601 0
080 190 - Mid-Tex Gas Division Addition 080.47061 37602 0
080 190 - Mid-Tex Gas Division Addition 080.47079 37602 0
080 190 - Mid-Tex Gas Division Addition 080.47079 38000 0
080 190 - Mid-Tex Gas Division Addition 080.47303 37602 0
080 190 - Mid-Tex Gas Division Addition 080.47303 38000 0
080 190 - Mid-Tex Gas Division Addition 080.47311 37602 78
080 190 - Mid-Tex Gas Division Addition 080.47311 38000 11
080 190 - Mid-Tex Gas Division Addition 080.47311 38100 3
080 190 - Mid-Tex Gas Division Addition 080.47311 38200 4
080 190 - Mid-Tex Gas Division Addition 080.47311 38300 1
080 190 - Mid-Tex Gas Division Addition 080.47445 37602 4
080 190 - Mid-Tex Gas Division Addition 080.47445 38000 3
080 190 - Mid-Tex Gas Division Addition 080.47445 38100 0
080 190 - Mid-Tex Gas Division Addition 080.47445 38200 0
080 190 - Mid-Tex Gas Division Addition 080.47445 38300 0
080 190 - Mid-Tex Gas Division Addition 080.47446 37602 0
080 190 - Mid-Tex Gas Division Addition 080.47600 37602 38
080 190 - Mid-Tex Gas Division Addition 080.47600 38000 16
MTX Additions by FERC
Page 2 of 101
400
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.47601 37602 5
080 190 - Mid-Tex Gas Division Addition 080.47601 38000 3
080 190 - Mid-Tex Gas Division Addition 080.47603 37602 40
080 190 - Mid-Tex Gas Division Addition 080.47603 38000 15
080 190 - Mid-Tex Gas Division Addition 080.47605 37602 31
080 190 - Mid-Tex Gas Division Addition 080.47605 38000 12
080 190 - Mid-Tex Gas Division Addition 080.47606 37602 52
080 190 - Mid-Tex Gas Division Addition 080.47606 38000 17
080 190 - Mid-Tex Gas Division Addition 080.47607 38000 293
080 190 - Mid-Tex Gas Division Addition 080.47681 37602 19
080 190 - Mid-Tex Gas Division Addition 080.47681 38000 12
080 190 - Mid-Tex Gas Division Addition 080.47682 37602 37
080 190 - Mid-Tex Gas Division Addition 080.47682 38000 26
080 190 - Mid-Tex Gas Division Addition 080.47848 37602 2
080 190 - Mid-Tex Gas Division Addition 080.47848 38000 0
080 190 - Mid-Tex Gas Division Addition 080.47848 38100 0
080 190 - Mid-Tex Gas Division Addition 080.47848 38200 0
080 190 - Mid-Tex Gas Division Addition 080.47848 38300 0
080 190 - Mid-Tex Gas Division Addition 080.47850 37602 2
080 190 - Mid-Tex Gas Division Addition 080.47850 38000 0
080 190 - Mid-Tex Gas Division Addition 080.47850 38100 0
080 190 - Mid-Tex Gas Division Addition 080.47850 38200 0
080 190 - Mid-Tex Gas Division Addition 080.47850 38300 0
080 190 - Mid-Tex Gas Division Addition 080.47857 37602 3
080 190 - Mid-Tex Gas Division Addition 080.47857 38000 1
080 190 - Mid-Tex Gas Division Addition 080.47857 38100 0
080 190 - Mid-Tex Gas Division Addition 080.47857 38200 0
080 190 - Mid-Tex Gas Division Addition 080.47857 38300 0
080 190 - Mid-Tex Gas Division Addition 080.47894 37600 (67)
080 190 - Mid-Tex Gas Division Addition 080.48010 37602 0
080 190 - Mid-Tex Gas Division Addition 080.48093 37602 360,820
080 190 - Mid-Tex Gas Division Addition 080.48110 37601 1
080 190 - Mid-Tex Gas Division Addition 080.48110 37800 0
080 190 - Mid-Tex Gas Division Addition 080.48519 37602 1
080 190 - Mid-Tex Gas Division Addition 080.48519 38000 0
080 190 - Mid-Tex Gas Division Addition 080.48519 38100 0
080 190 - Mid-Tex Gas Division Addition 080.48519 38200 0
080 190 - Mid-Tex Gas Division Addition 080.48519 38300 0
080 190 - Mid-Tex Gas Division Addition 080.48572 37602 0
080 190 - Mid-Tex Gas Division Addition 080.48572 38000 0
080 190 - Mid-Tex Gas Division Addition 080.48583 37602 0
080 190 - Mid-Tex Gas Division Addition 080.48651 37602 0
080 190 - Mid-Tex Gas Division Addition 080.48651 38000 0
080 190 - Mid-Tex Gas Division Addition 080.48651 38200 0
080 190 - Mid-Tex Gas Division Addition 080.48651 38300 0
080 190 - Mid-Tex Gas Division Addition 080.48677 37602 0
080 190 - Mid-Tex Gas Division Addition 080.48677 38000 0
080 190 - Mid-Tex Gas Division Addition 080.48677 38100 0
080 190 - Mid-Tex Gas Division Addition 080.48741 37602 0
080 190 - Mid-Tex Gas Division Addition 080.48741 38000 0
080 190 - Mid-Tex Gas Division Addition 080.48743 37602 0
080 190 - Mid-Tex Gas Division Addition 080.48782 37602 0
080 190 - Mid-Tex Gas Division Addition 080.48800 37602 67
080 190 - Mid-Tex Gas Division Addition 080.48800 38000 14
080 190 - Mid-Tex Gas Division Addition 080.48800 38100 1
080 190 - Mid-Tex Gas Division Addition 080.48800 38200 1
080 190 - Mid-Tex Gas Division Addition 080.48800 38300 1
080 190 - Mid-Tex Gas Division Addition 080.48844 37602 1
080 190 - Mid-Tex Gas Division Addition 080.48844 38000 0
080 190 - Mid-Tex Gas Division Addition 080.48844 38100 0
080 190 - Mid-Tex Gas Division Addition 080.48847 37602 3
080 190 - Mid-Tex Gas Division Addition 080.48847 38000 2
080 190 - Mid-Tex Gas Division Addition 080.48847 38100 0
080 190 - Mid-Tex Gas Division Addition 080.48847 38200 0
080 190 - Mid-Tex Gas Division Addition 080.48847 38300 0
080 190 - Mid-Tex Gas Division Addition 080.48957 37602 38,092
080 190 - Mid-Tex Gas Division Addition 080.49082 37602 1
080 190 - Mid-Tex Gas Division Addition 080.49082 38000 0
080 190 - Mid-Tex Gas Division Addition 080.49145 37600 10,548
080 190 - Mid-Tex Gas Division Addition 080.49145 37601 861,899
080 190 - Mid-Tex Gas Division Addition 080.49145 37800 168,763
080 190 - Mid-Tex Gas Division Addition 080.49148 37600 47
080 190 - Mid-Tex Gas Division Addition 080.49148 37601 3,862
080 190 - Mid-Tex Gas Division Addition 080.49148 37800 744
080 190 - Mid-Tex Gas Division Addition 080.49174 37602 1
080 190 - Mid-Tex Gas Division Addition 080.49253 37602 -
080 190 - Mid-Tex Gas Division Addition 080.49273 37602 2
080 190 - Mid-Tex Gas Division Addition 080.49273 38000 1
080 190 - Mid-Tex Gas Division Addition 080.49273 38100 0
080 190 - Mid-Tex Gas Division Addition 080.49273 38200 0
080 190 - Mid-Tex Gas Division Addition 080.49273 38300 0
080 190 - Mid-Tex Gas Division Addition 080.49313 37602 1,856
080 190 - Mid-Tex Gas Division Addition 080.49441 37602 1
080 190 - Mid-Tex Gas Division Addition 080.49441 38000 0
080 190 - Mid-Tex Gas Division Addition 080.49441 38100 0
080 190 - Mid-Tex Gas Division Addition 080.49441 38200 0
080 190 - Mid-Tex Gas Division Addition 080.49441 38300 0
080 190 - Mid-Tex Gas Division Addition 080.49469 37602 1
080 190 - Mid-Tex Gas Division Addition 080.49469 38000 0
080 190 - Mid-Tex Gas Division Addition 080.49469 38100 0
080 190 - Mid-Tex Gas Division Addition 080.49469 38200 0
080 190 - Mid-Tex Gas Division Addition 080.49469 38300 0
080 190 - Mid-Tex Gas Division Addition 080.49480 37602 0
080 190 - Mid-Tex Gas Division Addition 080.49480 38000 0
080 190 - Mid-Tex Gas Division Addition 080.49578 37602 0
080 190 - Mid-Tex Gas Division Addition 080.49578 38000 0
080 190 - Mid-Tex Gas Division Addition 080.49578 38100 0
080 190 - Mid-Tex Gas Division Addition 080.49578 38300 0
080 190 - Mid-Tex Gas Division Addition 080.49593 38000 5
080 190 - Mid-Tex Gas Division Addition 080.49593 38100 0
080 190 - Mid-Tex Gas Division Addition 080.49593 38200 0
080 190 - Mid-Tex Gas Division Addition 080.49593 38300 0
080 190 - Mid-Tex Gas Division Addition 080.49658 37602 (9,000)
080 190 - Mid-Tex Gas Division Addition 080.49679 38000 1
080 190 - Mid-Tex Gas Division Addition 080.49679 38100 0
080 190 - Mid-Tex Gas Division Addition 080.49679 38200 0
080 190 - Mid-Tex Gas Division Addition 080.49679 38300 0
MTX Additions by FERC
Page 3 of 101
401
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.49765 37602 0
080 190 - Mid-Tex Gas Division Addition 080.49765 38000 0
080 190 - Mid-Tex Gas Division Addition 080.49860 37602 0
080 190 - Mid-Tex Gas Division Addition 080.49910 37602 0
080 190 - Mid-Tex Gas Division Addition 080.49910 38000 0
080 190 - Mid-Tex Gas Division Addition 080.49910 38100 0
080 190 - Mid-Tex Gas Division Addition 080.49910 38200 0
080 190 - Mid-Tex Gas Division Addition 080.49910 38300 0
080 190 - Mid-Tex Gas Division Addition 080.49979 37602 0
080 190 - Mid-Tex Gas Division Addition 080.49984 37602 1
080 190 - Mid-Tex Gas Division Addition 080.49984 38000 0
080 190 - Mid-Tex Gas Division Addition 080.49984 38100 0
080 190 - Mid-Tex Gas Division Addition 080.49984 38200 0
080 190 - Mid-Tex Gas Division Addition 080.49984 38300 0
080 190 - Mid-Tex Gas Division Addition 080.49985 37602 1
080 190 - Mid-Tex Gas Division Addition 080.49985 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50060 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50109 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50115 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50116 37602 2
080 190 - Mid-Tex Gas Division Addition 080.50116 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50116 38100 0
080 190 - Mid-Tex Gas Division Addition 080.50116 38200 0
080 190 - Mid-Tex Gas Division Addition 080.50207 37602 1
080 190 - Mid-Tex Gas Division Addition 080.50207 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50220 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50270 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50270 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50331 37602 1
080 190 - Mid-Tex Gas Division Addition 080.50416 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50416 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50416 38200 0
080 190 - Mid-Tex Gas Division Addition 080.50416 38300 0
080 190 - Mid-Tex Gas Division Addition 080.50420 38000 1
080 190 - Mid-Tex Gas Division Addition 080.50421 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50421 38000 1
080 190 - Mid-Tex Gas Division Addition 080.50421 38100 0
080 190 - Mid-Tex Gas Division Addition 080.50421 38200 0
080 190 - Mid-Tex Gas Division Addition 080.50422 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50422 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50422 38200 0
080 190 - Mid-Tex Gas Division Addition 080.50424 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50424 38000 1
080 190 - Mid-Tex Gas Division Addition 080.50424 38100 0
080 190 - Mid-Tex Gas Division Addition 080.50424 38200 0
080 190 - Mid-Tex Gas Division Addition 080.50424 38300 0
080 190 - Mid-Tex Gas Division Addition 080.50425 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50425 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50454 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50454 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50497 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50504 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50504 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50504 38100 0
080 190 - Mid-Tex Gas Division Addition 080.50504 38200 0
080 190 - Mid-Tex Gas Division Addition 080.50504 38300 0
080 190 - Mid-Tex Gas Division Addition 080.50529 38000 2
080 190 - Mid-Tex Gas Division Addition 080.50529 38100 0
080 190 - Mid-Tex Gas Division Addition 080.50529 38200 0
080 190 - Mid-Tex Gas Division Addition 080.50635 38000 1
080 190 - Mid-Tex Gas Division Addition 080.50635 38100 0
080 190 - Mid-Tex Gas Division Addition 080.50635 38200 0
080 190 - Mid-Tex Gas Division Addition 080.50635 38300 0
080 190 - Mid-Tex Gas Division Addition 080.50659 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50659 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50659 38100 0
080 190 - Mid-Tex Gas Division Addition 080.50659 38200 0
080 190 - Mid-Tex Gas Division Addition 080.50659 38300 0
080 190 - Mid-Tex Gas Division Addition 080.50662 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50662 38100 0
080 190 - Mid-Tex Gas Division Addition 080.50662 38300 0
080 190 - Mid-Tex Gas Division Addition 080.50668 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50681 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50681 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50681 38200 0
080 190 - Mid-Tex Gas Division Addition 080.50717 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50727 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50727 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50745 37602 1
080 190 - Mid-Tex Gas Division Addition 080.50745 38000 2
080 190 - Mid-Tex Gas Division Addition 080.50745 38100 0
080 190 - Mid-Tex Gas Division Addition 080.50745 38200 0
080 190 - Mid-Tex Gas Division Addition 080.50745 38300 0
080 190 - Mid-Tex Gas Division Addition 080.50753 37602 2
080 190 - Mid-Tex Gas Division Addition 080.50753 38000 1
080 190 - Mid-Tex Gas Division Addition 080.50796 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50796 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50796 38100 0
080 190 - Mid-Tex Gas Division Addition 080.50819 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50830 38000 1
080 190 - Mid-Tex Gas Division Addition 080.50830 38100 0
080 190 - Mid-Tex Gas Division Addition 080.50830 38200 0
080 190 - Mid-Tex Gas Division Addition 080.50830 38300 0
080 190 - Mid-Tex Gas Division Addition 080.50838 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50838 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50838 38200 0
080 190 - Mid-Tex Gas Division Addition 080.50847 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50847 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50867 37602 3
080 190 - Mid-Tex Gas Division Addition 080.50867 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50867 38100 0
080 190 - Mid-Tex Gas Division Addition 080.50903 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50939 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50939 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50939 38100 0
080 190 - Mid-Tex Gas Division Addition 080.50939 38200 0
080 190 - Mid-Tex Gas Division Addition 080.50939 38300 0
MTX Additions by FERC
Page 4 of 101
402
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.50975 37602 1
080 190 - Mid-Tex Gas Division Addition 080.50975 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50975 38100 0
080 190 - Mid-Tex Gas Division Addition 080.50975 38200 0
080 190 - Mid-Tex Gas Division Addition 080.50975 38300 0
080 190 - Mid-Tex Gas Division Addition 080.50986 37602 0
080 190 - Mid-Tex Gas Division Addition 080.50986 38000 0
080 190 - Mid-Tex Gas Division Addition 080.50986 38200 0
080 190 - Mid-Tex Gas Division Addition 080.50986 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51003 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51003 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51004 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51004 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51004 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51005 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51005 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51025 37602 9,124
080 190 - Mid-Tex Gas Division Addition 080.51030 37602 1
080 190 - Mid-Tex Gas Division Addition 080.51030 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51030 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51033 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51033 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51034 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51034 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51034 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51041 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51041 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51053 37602 3
080 190 - Mid-Tex Gas Division Addition 080.51053 38000 1
080 190 - Mid-Tex Gas Division Addition 080.51053 38100 1
080 190 - Mid-Tex Gas Division Addition 080.51053 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51053 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51054 37602 2
080 190 - Mid-Tex Gas Division Addition 080.51054 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51054 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51054 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51054 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51093 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51093 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51093 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51093 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51094 38000 1
080 190 - Mid-Tex Gas Division Addition 080.51094 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51094 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51094 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51119 38000 (3)
080 190 - Mid-Tex Gas Division Addition 080.51119 38100 (0)
080 190 - Mid-Tex Gas Division Addition 080.51119 38200 (1)
080 190 - Mid-Tex Gas Division Addition 080.51119 38300 (0)
080 190 - Mid-Tex Gas Division Addition 080.51131 38100 (0)
080 190 - Mid-Tex Gas Division Addition 080.51131 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51131 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51132 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51133 38100 (0)
080 190 - Mid-Tex Gas Division Addition 080.51133 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51133 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51134 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51134 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51135 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51135 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51136 38100 (0)
080 190 - Mid-Tex Gas Division Addition 080.51136 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51136 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51137 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51137 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51138 38100 (0)
080 190 - Mid-Tex Gas Division Addition 080.51138 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51138 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51142 37602 501
080 190 - Mid-Tex Gas Division Addition 080.51142 38000 5
080 190 - Mid-Tex Gas Division Addition 080.51158 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51159 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51162 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51162 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51162 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51162 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51171 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51171 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51176 37602 2
080 190 - Mid-Tex Gas Division Addition 080.51176 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51220 37601 27,799
080 190 - Mid-Tex Gas Division Addition 080.51220 37800 3,194
080 190 - Mid-Tex Gas Division Addition 080.51221 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51221 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51235 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.51235 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.51244 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51250 37602 1
080 190 - Mid-Tex Gas Division Addition 080.51250 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51250 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51250 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51250 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51255 37602 1
080 190 - Mid-Tex Gas Division Addition 080.51255 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51263 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51263 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51313 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51313 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51313 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51313 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51313 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51317 37602 1
080 190 - Mid-Tex Gas Division Addition 080.51317 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51317 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51317 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51318 37602 1
080 190 - Mid-Tex Gas Division Addition 080.51318 38000 0
MTX Additions by FERC
Page 5 of 101
403
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.51318 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51332 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51332 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51332 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51371 37602 4
080 190 - Mid-Tex Gas Division Addition 080.51371 38000 1
080 190 - Mid-Tex Gas Division Addition 080.51376 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51376 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51391 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51391 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51395 37602 1
080 190 - Mid-Tex Gas Division Addition 080.51396 37602 1
080 190 - Mid-Tex Gas Division Addition 080.51396 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51405 37602 1
080 190 - Mid-Tex Gas Division Addition 080.51405 38000 1
080 190 - Mid-Tex Gas Division Addition 080.51405 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51405 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51405 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51420 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51420 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51420 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51420 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51420 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51421 37602 1
080 190 - Mid-Tex Gas Division Addition 080.51421 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51421 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51421 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51421 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51434 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.51434 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.51451 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51459 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51471 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51471 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51471 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51471 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51471 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51473 37602 1
080 190 - Mid-Tex Gas Division Addition 080.51473 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51473 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51473 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51473 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51474 37602 1
080 190 - Mid-Tex Gas Division Addition 080.51474 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51474 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51474 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51474 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51513 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51513 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51529 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51530 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51530 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51530 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51543 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.51617 37602 1
080 190 - Mid-Tex Gas Division Addition 080.51617 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51617 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51620 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51620 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51620 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51648 37602 (900)
080 190 - Mid-Tex Gas Division Addition 080.51648 38000 (106)
080 190 - Mid-Tex Gas Division Addition 080.51648 38100 (32)
080 190 - Mid-Tex Gas Division Addition 080.51648 38200 (11)
080 190 - Mid-Tex Gas Division Addition 080.51648 38300 (11)
080 190 - Mid-Tex Gas Division Addition 080.51653 37602 2
080 190 - Mid-Tex Gas Division Addition 080.51653 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51653 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51653 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51655 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51655 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51676 37602 (1)
080 190 - Mid-Tex Gas Division Addition 080.51676 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.51676 38100 (0)
080 190 - Mid-Tex Gas Division Addition 080.51702 37602 2
080 190 - Mid-Tex Gas Division Addition 080.51702 38000 1
080 190 - Mid-Tex Gas Division Addition 080.51743 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51743 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51783 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51801 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51801 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51801 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51804 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51806 37602 3
080 190 - Mid-Tex Gas Division Addition 080.51806 38000 2
080 190 - Mid-Tex Gas Division Addition 080.51806 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51806 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51806 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51829 37602 0
080 190 - Mid-Tex Gas Division Addition 080.51840 37602 1
080 190 - Mid-Tex Gas Division Addition 080.51840 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51840 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51840 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51840 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51843 37602 19
080 190 - Mid-Tex Gas Division Addition 080.51843 38000 2
080 190 - Mid-Tex Gas Division Addition 080.51846 37602 1
080 190 - Mid-Tex Gas Division Addition 080.51846 38000 0
080 190 - Mid-Tex Gas Division Addition 080.51846 38100 0
080 190 - Mid-Tex Gas Division Addition 080.51846 38200 0
080 190 - Mid-Tex Gas Division Addition 080.51846 38300 0
080 190 - Mid-Tex Gas Division Addition 080.51886 37602 1
080 190 - Mid-Tex Gas Division Addition 080.51889 37602 3
080 190 - Mid-Tex Gas Division Addition 080.51920 37602 23,907
080 190 - Mid-Tex Gas Division Addition 080.51994 37602 0
080 190 - Mid-Tex Gas Division Addition 080.52029 37602 1
080 190 - Mid-Tex Gas Division Addition 080.52036 37602 39
MTX Additions by FERC
Page 6 of 101
404
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.52039 37602 0
080 190 - Mid-Tex Gas Division Addition 080.52039 38000 0
080 190 - Mid-Tex Gas Division Addition 080.52052 38000 3
080 190 - Mid-Tex Gas Division Addition 080.52052 38200 0
080 190 - Mid-Tex Gas Division Addition 080.52052 38300 0
080 190 - Mid-Tex Gas Division Addition 080.52053 38000 1
080 190 - Mid-Tex Gas Division Addition 080.52055 38000 3
080 190 - Mid-Tex Gas Division Addition 080.52056 38000 1
080 190 - Mid-Tex Gas Division Addition 080.52056 38200 0
080 190 - Mid-Tex Gas Division Addition 080.52108 37602 1,554,872
080 190 - Mid-Tex Gas Division Addition 080.52108 38000 31,732
080 190 - Mid-Tex Gas Division Addition 080.52232 38000 0
080 190 - Mid-Tex Gas Division Addition 080.52232 38100 0
080 190 - Mid-Tex Gas Division Addition 080.52232 38200 0
080 190 - Mid-Tex Gas Division Addition 080.52232 38300 0
080 190 - Mid-Tex Gas Division Addition 080.52245 37602 0
080 190 - Mid-Tex Gas Division Addition 080.52260 37602 0
080 190 - Mid-Tex Gas Division Addition 080.52287 37602 1
080 190 - Mid-Tex Gas Division Addition 080.52287 38000 0
080 190 - Mid-Tex Gas Division Addition 080.52287 38100 0
080 190 - Mid-Tex Gas Division Addition 080.52287 38200 0
080 190 - Mid-Tex Gas Division Addition 080.52287 38300 0
080 190 - Mid-Tex Gas Division Addition 080.52327 37602 1
080 190 - Mid-Tex Gas Division Addition 080.52327 38100 0
080 190 - Mid-Tex Gas Division Addition 080.52327 38200 0
080 190 - Mid-Tex Gas Division Addition 080.52327 38300 0
080 190 - Mid-Tex Gas Division Addition 080.52338 37602 0
080 190 - Mid-Tex Gas Division Addition 080.52367 37602 1
080 190 - Mid-Tex Gas Division Addition 080.52367 38000 0
080 190 - Mid-Tex Gas Division Addition 080.52367 38100 0
080 190 - Mid-Tex Gas Division Addition 080.52367 38200 0
080 190 - Mid-Tex Gas Division Addition 080.52367 38300 0
080 190 - Mid-Tex Gas Division Addition 080.52398 37602 0
080 190 - Mid-Tex Gas Division Addition 080.52398 38000 0
080 190 - Mid-Tex Gas Division Addition 080.52412 37602 0
080 190 - Mid-Tex Gas Division Addition 080.52442 37601 0
080 190 - Mid-Tex Gas Division Addition 080.52442 37800 0
080 190 - Mid-Tex Gas Division Addition 080.52463 37602 27
080 190 - Mid-Tex Gas Division Addition 080.52463 38000 11
080 190 - Mid-Tex Gas Division Addition 080.52476 37602 0
080 190 - Mid-Tex Gas Division Addition 080.52476 38000 0
080 190 - Mid-Tex Gas Division Addition 080.52476 38100 0
080 190 - Mid-Tex Gas Division Addition 080.52476 38200 0
080 190 - Mid-Tex Gas Division Addition 080.52476 38300 0
080 190 - Mid-Tex Gas Division Addition 080.52537 37602 0
080 190 - Mid-Tex Gas Division Addition 080.52537 38000 0
080 190 - Mid-Tex Gas Division Addition 080.52538 37602 0
080 190 - Mid-Tex Gas Division Addition 080.52538 38000 0
080 190 - Mid-Tex Gas Division Addition 080.52539 37602 0
080 190 - Mid-Tex Gas Division Addition 080.52540 37602 0
080 190 - Mid-Tex Gas Division Addition 080.52540 38000 0
080 190 - Mid-Tex Gas Division Addition 080.52540 38100 0
080 190 - Mid-Tex Gas Division Addition 080.52540 38200 0
080 190 - Mid-Tex Gas Division Addition 080.52540 38300 0
080 190 - Mid-Tex Gas Division Addition 080.52594 38000 0
080 190 - Mid-Tex Gas Division Addition 080.52594 38100 0
080 190 - Mid-Tex Gas Division Addition 080.52594 38200 0
080 190 - Mid-Tex Gas Division Addition 080.52594 38300 0
080 190 - Mid-Tex Gas Division Addition 080.52775 38000 0
080 190 - Mid-Tex Gas Division Addition 080.52803 37602 0
080 190 - Mid-Tex Gas Division Addition 080.52821 38000 0
080 190 - Mid-Tex Gas Division Addition 080.52904 37602 1
080 190 - Mid-Tex Gas Division Addition 080.52904 38000 0
080 190 - Mid-Tex Gas Division Addition 080.52904 38100 0
080 190 - Mid-Tex Gas Division Addition 080.52904 38200 0
080 190 - Mid-Tex Gas Division Addition 080.52904 38300 0
080 190 - Mid-Tex Gas Division Addition 080.52906 37601 (278)
080 190 - Mid-Tex Gas Division Addition 080.52906 37602 (4)
080 190 - Mid-Tex Gas Division Addition 080.52906 37800 (115)
080 190 - Mid-Tex Gas Division Addition 080.52909 37602 1
080 190 - Mid-Tex Gas Division Addition 080.52909 38000 0
080 190 - Mid-Tex Gas Division Addition 080.52909 38100 0
080 190 - Mid-Tex Gas Division Addition 080.52909 38200 0
080 190 - Mid-Tex Gas Division Addition 080.52909 38300 0
080 190 - Mid-Tex Gas Division Addition 080.52910 37602 0
080 190 - Mid-Tex Gas Division Addition 080.52913 37602 0
080 190 - Mid-Tex Gas Division Addition 080.52914 37602 0
080 190 - Mid-Tex Gas Division Addition 080.52917 37602 256
080 190 - Mid-Tex Gas Division Addition 080.52917 38000 64
080 190 - Mid-Tex Gas Division Addition 080.53005 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53005 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53046 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53048 37602 1
080 190 - Mid-Tex Gas Division Addition 080.53048 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53048 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53048 38200 0
080 190 - Mid-Tex Gas Division Addition 080.53048 38300 0
080 190 - Mid-Tex Gas Division Addition 080.53189 37602 2
080 190 - Mid-Tex Gas Division Addition 080.53189 38000 1
080 190 - Mid-Tex Gas Division Addition 080.53189 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53189 38200 0
080 190 - Mid-Tex Gas Division Addition 080.53189 38300 2
080 190 - Mid-Tex Gas Division Addition 080.53195 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53195 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53195 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53195 38200 0
080 190 - Mid-Tex Gas Division Addition 080.53195 38300 0
080 190 - Mid-Tex Gas Division Addition 080.53204 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53221 37602 259
080 190 - Mid-Tex Gas Division Addition 080.53221 38000 19
080 190 - Mid-Tex Gas Division Addition 080.53238 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53238 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53242 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53242 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53254 37602 2
080 190 - Mid-Tex Gas Division Addition 080.53254 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53254 38200 0
MTX Additions by FERC
Page 7 of 101
405
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.53254 38300 0
080 190 - Mid-Tex Gas Division Addition 080.53277 37602 2
080 190 - Mid-Tex Gas Division Addition 080.53277 38000 1
080 190 - Mid-Tex Gas Division Addition 080.53277 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53277 38200 0
080 190 - Mid-Tex Gas Division Addition 080.53277 38300 0
080 190 - Mid-Tex Gas Division Addition 080.53302 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53302 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53302 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53302 38200 0
080 190 - Mid-Tex Gas Division Addition 080.53302 38300 0
080 190 - Mid-Tex Gas Division Addition 080.53322 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53322 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53384 37602 183
080 190 - Mid-Tex Gas Division Addition 080.53385 37600 32
080 190 - Mid-Tex Gas Division Addition 080.53392 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53451 37602 1
080 190 - Mid-Tex Gas Division Addition 080.53451 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53479 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53535 37602 1
080 190 - Mid-Tex Gas Division Addition 080.53535 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53535 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53535 38300 0
080 190 - Mid-Tex Gas Division Addition 080.53555 37602 1
080 190 - Mid-Tex Gas Division Addition 080.53555 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53555 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53555 38200 0
080 190 - Mid-Tex Gas Division Addition 080.53555 38300 0
080 190 - Mid-Tex Gas Division Addition 080.53561 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53561 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53591 37602 44
080 190 - Mid-Tex Gas Division Addition 080.53612 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53613 37602 515
080 190 - Mid-Tex Gas Division Addition 080.53614 37602 1
080 190 - Mid-Tex Gas Division Addition 080.53614 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53623 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53623 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53623 38200 0
080 190 - Mid-Tex Gas Division Addition 080.53623 38300 0
080 190 - Mid-Tex Gas Division Addition 080.53624 37602 1
080 190 - Mid-Tex Gas Division Addition 080.53624 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53624 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53624 38200 0
080 190 - Mid-Tex Gas Division Addition 080.53624 38300 0
080 190 - Mid-Tex Gas Division Addition 080.53627 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53654 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53654 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53654 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53668 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53671 37602 1
080 190 - Mid-Tex Gas Division Addition 080.53671 38000 1
080 190 - Mid-Tex Gas Division Addition 080.53671 38100 1
080 190 - Mid-Tex Gas Division Addition 080.53671 38200 0
080 190 - Mid-Tex Gas Division Addition 080.53671 38300 0
080 190 - Mid-Tex Gas Division Addition 080.53675 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53675 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53677 37601 0
080 190 - Mid-Tex Gas Division Addition 080.53677 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53678 38000 1
080 190 - Mid-Tex Gas Division Addition 080.53678 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53678 38200 0
080 190 - Mid-Tex Gas Division Addition 080.53678 38300 0
080 190 - Mid-Tex Gas Division Addition 080.53684 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53696 37602 1
080 190 - Mid-Tex Gas Division Addition 080.53696 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53696 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53696 38200 0
080 190 - Mid-Tex Gas Division Addition 080.53696 38300 0
080 190 - Mid-Tex Gas Division Addition 080.53697 37602 2
080 190 - Mid-Tex Gas Division Addition 080.53697 38000 1
080 190 - Mid-Tex Gas Division Addition 080.53697 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53697 38200 0
080 190 - Mid-Tex Gas Division Addition 080.53697 38300 0
080 190 - Mid-Tex Gas Division Addition 080.53699 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53699 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53700 37602 1
080 190 - Mid-Tex Gas Division Addition 080.53700 38000 1
080 190 - Mid-Tex Gas Division Addition 080.53700 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53700 38200 0
080 190 - Mid-Tex Gas Division Addition 080.53711 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53711 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53712 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53712 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53712 38200 0
080 190 - Mid-Tex Gas Division Addition 080.53712 38300 0
080 190 - Mid-Tex Gas Division Addition 080.53713 37602 1
080 190 - Mid-Tex Gas Division Addition 080.53713 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53713 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53713 38200 0
080 190 - Mid-Tex Gas Division Addition 080.53713 38300 0
080 190 - Mid-Tex Gas Division Addition 080.53731 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53778 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53779 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53779 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53785 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53800 37602 412
080 190 - Mid-Tex Gas Division Addition 080.53809 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53810 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53810 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53811 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53811 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53811 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53813 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53813 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53824 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.53824 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.53829 37602 0
MTX Additions by FERC
Page 8 of 101
406
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.53829 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53829 38100 0
080 190 - Mid-Tex Gas Division Addition 080.53831 37602 3
080 190 - Mid-Tex Gas Division Addition 080.53831 37800 0
080 190 - Mid-Tex Gas Division Addition 080.53831 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53874 37602 0
080 190 - Mid-Tex Gas Division Addition 080.53874 38000 0
080 190 - Mid-Tex Gas Division Addition 080.53892 37602 5,876
080 190 - Mid-Tex Gas Division Addition 080.53893 37602 5,876
080 190 - Mid-Tex Gas Division Addition 080.53894 37602 2,474
080 190 - Mid-Tex Gas Division Addition 080.53909 37601 4
080 190 - Mid-Tex Gas Division Addition 080.53959 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54000 37602 1
080 190 - Mid-Tex Gas Division Addition 080.54000 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54002 37602 1
080 190 - Mid-Tex Gas Division Addition 080.54002 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54002 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54002 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54021 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54021 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54037 37602 1,418
080 190 - Mid-Tex Gas Division Addition 080.54043 37602 3
080 190 - Mid-Tex Gas Division Addition 080.54043 38000 2
080 190 - Mid-Tex Gas Division Addition 080.54043 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54043 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54043 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54046 37602 63
080 190 - Mid-Tex Gas Division Addition 080.54046 38000 12
080 190 - Mid-Tex Gas Division Addition 080.54052 38000 1
080 190 - Mid-Tex Gas Division Addition 080.54052 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54052 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54086 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54086 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54090 37602 2
080 190 - Mid-Tex Gas Division Addition 080.54090 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54097 37602 2
080 190 - Mid-Tex Gas Division Addition 080.54112 37602 16
080 190 - Mid-Tex Gas Division Addition 080.54141 37602 83
080 190 - Mid-Tex Gas Division Addition 080.54141 38000 36
080 190 - Mid-Tex Gas Division Addition 080.54155 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54160 37601 4
080 190 - Mid-Tex Gas Division Addition 080.54160 37602 2
080 190 - Mid-Tex Gas Division Addition 080.54166 37602 4
080 190 - Mid-Tex Gas Division Addition 080.54166 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54195 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54195 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54211 37602 2
080 190 - Mid-Tex Gas Division Addition 080.54211 38000 1
080 190 - Mid-Tex Gas Division Addition 080.54211 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54211 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54211 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54213 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54217 37602 1
080 190 - Mid-Tex Gas Division Addition 080.54217 38000 1
080 190 - Mid-Tex Gas Division Addition 080.54217 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54217 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54217 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54253 37602 2
080 190 - Mid-Tex Gas Division Addition 080.54264 37602 16
080 190 - Mid-Tex Gas Division Addition 080.54264 38000 1
080 190 - Mid-Tex Gas Division Addition 080.54270 37602 14
080 190 - Mid-Tex Gas Division Addition 080.54270 38000 8
080 190 - Mid-Tex Gas Division Addition 080.54273 37602 1
080 190 - Mid-Tex Gas Division Addition 080.54273 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54277 37602 1,295
080 190 - Mid-Tex Gas Division Addition 080.54277 37800 3,022
080 190 - Mid-Tex Gas Division Addition 080.54287 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54287 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54287 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54287 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54287 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54291 37602 5
080 190 - Mid-Tex Gas Division Addition 080.54318 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54320 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54341 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54341 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54341 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54341 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54341 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54356 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54356 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54357 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54357 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54357 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54357 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54359 38000 2
080 190 - Mid-Tex Gas Division Addition 080.54359 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54359 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54359 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54360 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54360 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54360 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54360 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54366 37602 1
080 190 - Mid-Tex Gas Division Addition 080.54366 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54366 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54366 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54366 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54370 38000 2
080 190 - Mid-Tex Gas Division Addition 080.54370 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54370 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54370 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54427 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.54427 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.54427 38100 (0)
080 190 - Mid-Tex Gas Division Addition 080.54428 37602 6
080 190 - Mid-Tex Gas Division Addition 080.54428 38000 3
MTX Additions by FERC
Page 9 of 101
407
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.54428 38100 1
080 190 - Mid-Tex Gas Division Addition 080.54428 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54428 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54431 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54431 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54431 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54446 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54446 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54447 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54468 37602 2
080 190 - Mid-Tex Gas Division Addition 080.54468 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54468 38100 2
080 190 - Mid-Tex Gas Division Addition 080.54468 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54468 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54472 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54472 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54486 37602 928
080 190 - Mid-Tex Gas Division Addition 080.54551 37602 2
080 190 - Mid-Tex Gas Division Addition 080.54570 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54570 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54570 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54590 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54590 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54590 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54590 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54590 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54610 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54610 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54611 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54624 37602 1
080 190 - Mid-Tex Gas Division Addition 080.54624 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54624 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54624 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54624 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54625 37602 2
080 190 - Mid-Tex Gas Division Addition 080.54625 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54625 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54625 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54661 37600 2,371
080 190 - Mid-Tex Gas Division Addition 080.54661 37601 99,214
080 190 - Mid-Tex Gas Division Addition 080.54661 37602 241
080 190 - Mid-Tex Gas Division Addition 080.54661 37800 16,438
080 190 - Mid-Tex Gas Division Addition 080.54681 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54685 37602 61
080 190 - Mid-Tex Gas Division Addition 080.54704 37602 2
080 190 - Mid-Tex Gas Division Addition 080.54704 38000 1
080 190 - Mid-Tex Gas Division Addition 080.54704 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54704 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54704 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54706 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54706 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54706 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54706 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54706 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54707 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54707 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54710 38000 1
080 190 - Mid-Tex Gas Division Addition 080.54710 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54710 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54711 37602 1
080 190 - Mid-Tex Gas Division Addition 080.54711 38000 1
080 190 - Mid-Tex Gas Division Addition 080.54711 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54711 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54711 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54717 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54717 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54733 37601 102
080 190 - Mid-Tex Gas Division Addition 080.54733 37602 1
080 190 - Mid-Tex Gas Division Addition 080.54733 37800 17
080 190 - Mid-Tex Gas Division Addition 080.54794 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54794 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54794 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54794 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54794 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54797 37602 2
080 190 - Mid-Tex Gas Division Addition 080.54797 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54797 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54797 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54797 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54842 38000 1
080 190 - Mid-Tex Gas Division Addition 080.54842 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54842 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54842 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54854 37602 1
080 190 - Mid-Tex Gas Division Addition 080.54854 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54854 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54854 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54854 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54858 37602 18
080 190 - Mid-Tex Gas Division Addition 080.54858 38000 1
080 190 - Mid-Tex Gas Division Addition 080.54858 38100 3
080 190 - Mid-Tex Gas Division Addition 080.54858 38200 3
080 190 - Mid-Tex Gas Division Addition 080.54858 38300 3
080 190 - Mid-Tex Gas Division Addition 080.54859 37602 1
080 190 - Mid-Tex Gas Division Addition 080.54863 37602 3
080 190 - Mid-Tex Gas Division Addition 080.54863 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54875 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54875 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54894 37602 79
080 190 - Mid-Tex Gas Division Addition 080.54895 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54926 37602 0
080 190 - Mid-Tex Gas Division Addition 080.54934 37602 6
080 190 - Mid-Tex Gas Division Addition 080.54934 38000 1
080 190 - Mid-Tex Gas Division Addition 080.54934 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54934 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54934 38300 0
080 190 - Mid-Tex Gas Division Addition 080.54965 37602 0
MTX Additions by FERC
Page 10 of 101
408
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.54988 38000 0
080 190 - Mid-Tex Gas Division Addition 080.54988 38100 0
080 190 - Mid-Tex Gas Division Addition 080.54988 38200 0
080 190 - Mid-Tex Gas Division Addition 080.54988 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55018 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55026 37602 1
080 190 - Mid-Tex Gas Division Addition 080.55026 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55026 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55026 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55026 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55033 37602 1
080 190 - Mid-Tex Gas Division Addition 080.55033 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55033 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55033 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55041 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55041 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55045 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55054 37602 2
080 190 - Mid-Tex Gas Division Addition 080.55054 38000 1
080 190 - Mid-Tex Gas Division Addition 080.55054 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55054 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55054 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55055 37602 1
080 190 - Mid-Tex Gas Division Addition 080.55055 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55055 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55055 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55055 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55059 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55059 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55060 37602 61
080 190 - Mid-Tex Gas Division Addition 080.55060 38000 21
080 190 - Mid-Tex Gas Division Addition 080.55064 37602 1
080 190 - Mid-Tex Gas Division Addition 080.55064 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55064 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55065 37601 1,746
080 190 - Mid-Tex Gas Division Addition 080.55065 37602 217
080 190 - Mid-Tex Gas Division Addition 080.55065 37800 173
080 190 - Mid-Tex Gas Division Addition 080.55065 38000 22
080 190 - Mid-Tex Gas Division Addition 080.55070 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55070 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55083 37602 1
080 190 - Mid-Tex Gas Division Addition 080.55083 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55083 38100 1
080 190 - Mid-Tex Gas Division Addition 080.55083 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55083 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55091 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.55097 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55147 37602 1,456
080 190 - Mid-Tex Gas Division Addition 080.55170 37602 61
080 190 - Mid-Tex Gas Division Addition 080.55172 37602 3
080 190 - Mid-Tex Gas Division Addition 080.55172 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55172 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55172 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55178 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.55178 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.55178 38100 (0)
080 190 - Mid-Tex Gas Division Addition 080.55178 38200 (0)
080 190 - Mid-Tex Gas Division Addition 080.55178 38300 (0)
080 190 - Mid-Tex Gas Division Addition 080.55180 37602 1
080 190 - Mid-Tex Gas Division Addition 080.55180 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55192 37602 1
080 190 - Mid-Tex Gas Division Addition 080.55192 38000 1
080 190 - Mid-Tex Gas Division Addition 080.55192 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55192 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55192 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55195 37602 3
080 190 - Mid-Tex Gas Division Addition 080.55195 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55195 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55195 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55196 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55204 37602 35
080 190 - Mid-Tex Gas Division Addition 080.55204 38000 12
080 190 - Mid-Tex Gas Division Addition 080.55205 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55210 37602 6
080 190 - Mid-Tex Gas Division Addition 080.55210 38000 1
080 190 - Mid-Tex Gas Division Addition 080.55221 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55221 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55232 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55232 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55232 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55232 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55234 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55241 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55241 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55241 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55251 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.55257 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55260 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55260 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55279 37602 49
080 190 - Mid-Tex Gas Division Addition 080.55279 38000 13
080 190 - Mid-Tex Gas Division Addition 080.55279 38100 18
080 190 - Mid-Tex Gas Division Addition 080.55279 38200 4
080 190 - Mid-Tex Gas Division Addition 080.55279 38300 4
080 190 - Mid-Tex Gas Division Addition 080.55280 37602 51
080 190 - Mid-Tex Gas Division Addition 080.55280 38000 56
080 190 - Mid-Tex Gas Division Addition 080.55280 38100 4
080 190 - Mid-Tex Gas Division Addition 080.55280 38200 1
080 190 - Mid-Tex Gas Division Addition 080.55304 37602 78
080 190 - Mid-Tex Gas Division Addition 080.55304 38000 8
080 190 - Mid-Tex Gas Division Addition 080.55320 37602 100
080 190 - Mid-Tex Gas Division Addition 080.55320 38000 16
080 190 - Mid-Tex Gas Division Addition 080.55322 37602 73
080 190 - Mid-Tex Gas Division Addition 080.55322 38000 31
080 190 - Mid-Tex Gas Division Addition 080.55337 37601 39
080 190 - Mid-Tex Gas Division Addition 080.55337 37602 1
080 190 - Mid-Tex Gas Division Addition 080.55337 37800 3
MTX Additions by FERC
Page 11 of 101
409
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.55351 37602 102
080 190 - Mid-Tex Gas Division Addition 080.55351 38000 3
080 190 - Mid-Tex Gas Division Addition 080.55379 37602 45
080 190 - Mid-Tex Gas Division Addition 080.55379 38000 26
080 190 - Mid-Tex Gas Division Addition 080.55379 38100 10
080 190 - Mid-Tex Gas Division Addition 080.55379 38200 8
080 190 - Mid-Tex Gas Division Addition 080.55379 38300 10
080 190 - Mid-Tex Gas Division Addition 080.55380 37602 (629)
080 190 - Mid-Tex Gas Division Addition 080.55380 38000 (210)
080 190 - Mid-Tex Gas Division Addition 080.55380 38100 (105)
080 190 - Mid-Tex Gas Division Addition 080.55380 38200 (52)
080 190 - Mid-Tex Gas Division Addition 080.55380 38300 (52)
080 190 - Mid-Tex Gas Division Addition 080.55397 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.55405 37601 399
080 190 - Mid-Tex Gas Division Addition 080.55405 37800 40
080 190 - Mid-Tex Gas Division Addition 080.55419 37602 3
080 190 - Mid-Tex Gas Division Addition 080.55419 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55419 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55419 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55419 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55422 37602 1
080 190 - Mid-Tex Gas Division Addition 080.55422 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55422 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55422 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55423 37602 1
080 190 - Mid-Tex Gas Division Addition 080.55423 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55424 37602 2
080 190 - Mid-Tex Gas Division Addition 080.55424 38000 1
080 190 - Mid-Tex Gas Division Addition 080.55424 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55424 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55425 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55425 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55485 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55487 37602 1
080 190 - Mid-Tex Gas Division Addition 080.55487 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55487 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55487 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55487 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55488 37602 4
080 190 - Mid-Tex Gas Division Addition 080.55488 38000 1
080 190 - Mid-Tex Gas Division Addition 080.55488 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55488 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55488 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55495 37602 53
080 190 - Mid-Tex Gas Division Addition 080.55513 38000 3
080 190 - Mid-Tex Gas Division Addition 080.55513 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55513 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55513 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55520 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55520 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55565 37602 1
080 190 - Mid-Tex Gas Division Addition 080.55565 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55565 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55565 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55565 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55568 37602 2
080 190 - Mid-Tex Gas Division Addition 080.55568 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55568 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55568 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55568 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55642 37602 106
080 190 - Mid-Tex Gas Division Addition 080.55642 38000 25
080 190 - Mid-Tex Gas Division Addition 080.55642 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55642 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55667 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55667 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55674 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55674 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55674 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55674 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55674 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55682 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.55682 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.55683 37602 13
080 190 - Mid-Tex Gas Division Addition 080.55683 38000 9
080 190 - Mid-Tex Gas Division Addition 080.55697 37602 2
080 190 - Mid-Tex Gas Division Addition 080.55697 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55710 37602 1
080 190 - Mid-Tex Gas Division Addition 080.55710 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55710 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55710 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55710 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55728 37601 284
080 190 - Mid-Tex Gas Division Addition 080.55775 37602 127
080 190 - Mid-Tex Gas Division Addition 080.55775 38000 44
080 190 - Mid-Tex Gas Division Addition 080.55797 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55797 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55797 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55823 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55841 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55867 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55867 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55867 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55867 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55867 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55920 37602 104
080 190 - Mid-Tex Gas Division Addition 080.55920 38000 10
080 190 - Mid-Tex Gas Division Addition 080.55920 38100 20
080 190 - Mid-Tex Gas Division Addition 080.55920 38200 4
080 190 - Mid-Tex Gas Division Addition 080.55920 38300 4
080 190 - Mid-Tex Gas Division Addition 080.55923 37602 1
080 190 - Mid-Tex Gas Division Addition 080.55923 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55923 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55926 37602 13
080 190 - Mid-Tex Gas Division Addition 080.55926 38000 2
080 190 - Mid-Tex Gas Division Addition 080.55952 37601 365,316
080 190 - Mid-Tex Gas Division Addition 080.55952 37602 39,342
MTX Additions by FERC
Page 12 of 101
410
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.55952 37800 151,747
080 190 - Mid-Tex Gas Division Addition 080.55961 37602 1
080 190 - Mid-Tex Gas Division Addition 080.55961 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55961 38100 0
080 190 - Mid-Tex Gas Division Addition 080.55961 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55961 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55963 37602 1
080 190 - Mid-Tex Gas Division Addition 080.55963 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55963 38100 1
080 190 - Mid-Tex Gas Division Addition 080.55963 38200 1
080 190 - Mid-Tex Gas Division Addition 080.55963 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55966 37602 1
080 190 - Mid-Tex Gas Division Addition 080.55966 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55975 37602 124
080 190 - Mid-Tex Gas Division Addition 080.55975 38000 82
080 190 - Mid-Tex Gas Division Addition 080.55976 37602 115
080 190 - Mid-Tex Gas Division Addition 080.55976 38000 77
080 190 - Mid-Tex Gas Division Addition 080.55984 37602 0
080 190 - Mid-Tex Gas Division Addition 080.55984 38000 0
080 190 - Mid-Tex Gas Division Addition 080.55984 38200 0
080 190 - Mid-Tex Gas Division Addition 080.55984 38300 0
080 190 - Mid-Tex Gas Division Addition 080.55992 37602 2
080 190 - Mid-Tex Gas Division Addition 080.55992 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56012 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56012 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56030 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56030 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56033 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56034 37602 96
080 190 - Mid-Tex Gas Division Addition 080.56034 38000 11
080 190 - Mid-Tex Gas Division Addition 080.56044 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56065 37602 1
080 190 - Mid-Tex Gas Division Addition 080.56065 38000 2
080 190 - Mid-Tex Gas Division Addition 080.56067 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56067 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56067 38100 0
080 190 - Mid-Tex Gas Division Addition 080.56067 38200 0
080 190 - Mid-Tex Gas Division Addition 080.56067 38300 0
080 190 - Mid-Tex Gas Division Addition 080.56068 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56068 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56097 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56105 37602 379
080 190 - Mid-Tex Gas Division Addition 080.56107 37602 3
080 190 - Mid-Tex Gas Division Addition 080.56107 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56107 38100 0
080 190 - Mid-Tex Gas Division Addition 080.56107 38200 0
080 190 - Mid-Tex Gas Division Addition 080.56107 38300 0
080 190 - Mid-Tex Gas Division Addition 080.56110 37600 14
080 190 - Mid-Tex Gas Division Addition 080.56144 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.56144 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.56147 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.56147 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.56150 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.56160 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56162 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.56164 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.56164 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.56173 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.56173 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.56174 37602 1
080 190 - Mid-Tex Gas Division Addition 080.56174 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56174 38100 0
080 190 - Mid-Tex Gas Division Addition 080.56174 38200 0
080 190 - Mid-Tex Gas Division Addition 080.56174 38300 0
080 190 - Mid-Tex Gas Division Addition 080.56180 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56180 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56186 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.56187 37602 1
080 190 - Mid-Tex Gas Division Addition 080.56187 38100 0
080 190 - Mid-Tex Gas Division Addition 080.56187 38200 0
080 190 - Mid-Tex Gas Division Addition 080.56187 38300 0
080 190 - Mid-Tex Gas Division Addition 080.56188 37602 1
080 190 - Mid-Tex Gas Division Addition 080.56188 38100 0
080 190 - Mid-Tex Gas Division Addition 080.56188 38200 0
080 190 - Mid-Tex Gas Division Addition 080.56188 38300 0
080 190 - Mid-Tex Gas Division Addition 080.56194 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56195 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56195 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56199 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56199 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56199 38100 0
080 190 - Mid-Tex Gas Division Addition 080.56199 38200 0
080 190 - Mid-Tex Gas Division Addition 080.56199 38300 0
080 190 - Mid-Tex Gas Division Addition 080.56200 37602 24
080 190 - Mid-Tex Gas Division Addition 080.56200 38000 19
080 190 - Mid-Tex Gas Division Addition 080.56209 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.56209 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.56222 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56222 38100 0
080 190 - Mid-Tex Gas Division Addition 080.56222 38200 0
080 190 - Mid-Tex Gas Division Addition 080.56222 38300 0
080 190 - Mid-Tex Gas Division Addition 080.56225 38000 1
080 190 - Mid-Tex Gas Division Addition 080.56225 38100 0
080 190 - Mid-Tex Gas Division Addition 080.56228 37602 6
080 190 - Mid-Tex Gas Division Addition 080.56228 38000 5
080 190 - Mid-Tex Gas Division Addition 080.56229 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.56232 37602 105
080 190 - Mid-Tex Gas Division Addition 080.56232 38000 31
080 190 - Mid-Tex Gas Division Addition 080.56232 38100 31
080 190 - Mid-Tex Gas Division Addition 080.56232 38200 10
080 190 - Mid-Tex Gas Division Addition 080.56232 38300 21
080 190 - Mid-Tex Gas Division Addition 080.56234 37602 2
080 190 - Mid-Tex Gas Division Addition 080.56234 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56236 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56237 37602 1
080 190 - Mid-Tex Gas Division Addition 080.56237 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56237 38100 0
MTX Additions by FERC
Page 13 of 101
411
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.56237 38300 0
080 190 - Mid-Tex Gas Division Addition 080.56244 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56245 37602 288
080 190 - Mid-Tex Gas Division Addition 080.56245 38000 15
080 190 - Mid-Tex Gas Division Addition 080.56246 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.56249 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56251 37602 5
080 190 - Mid-Tex Gas Division Addition 080.56321 38000 500
080 190 - Mid-Tex Gas Division Addition 080.56334 38000 -
080 190 - Mid-Tex Gas Division Addition 080.56339 37601 -
080 190 - Mid-Tex Gas Division Addition 080.56339 37602 -
080 190 - Mid-Tex Gas Division Addition 080.56363 38000 395,738
080 190 - Mid-Tex Gas Division Addition 080.56364 38000 1,169,087
080 190 - Mid-Tex Gas Division Addition 080.56364 38100 -
080 190 - Mid-Tex Gas Division Addition 080.56365 38000 4,059,623
080 190 - Mid-Tex Gas Division Addition 080.56366 38000 673,116
080 190 - Mid-Tex Gas Division Addition 080.56367 38000 824,745
080 190 - Mid-Tex Gas Division Addition 080.56368 38000 1,404,951
080 190 - Mid-Tex Gas Division Addition 080.56369 38000 427,524
080 190 - Mid-Tex Gas Division Addition 080.56370 38000 722,017
080 190 - Mid-Tex Gas Division Addition 080.56370 38100 -
080 190 - Mid-Tex Gas Division Addition 080.56371 38100 264,770
080 190 - Mid-Tex Gas Division Addition 080.56371 38200 441,860
080 190 - Mid-Tex Gas Division Addition 080.56371 38300 (229,268)
080 190 - Mid-Tex Gas Division Addition 080.56372 38100 393,292
080 190 - Mid-Tex Gas Division Addition 080.56372 38200 293,587
080 190 - Mid-Tex Gas Division Addition 080.56372 38300 (176,044)
080 190 - Mid-Tex Gas Division Addition 080.56373 38100 808,332
080 190 - Mid-Tex Gas Division Addition 080.56373 38200 258,837
080 190 - Mid-Tex Gas Division Addition 080.56373 38300 (296,960)
080 190 - Mid-Tex Gas Division Addition 080.56374 38100 348,371
080 190 - Mid-Tex Gas Division Addition 080.56374 38200 168,069
080 190 - Mid-Tex Gas Division Addition 080.56374 38300 (153,297)
080 190 - Mid-Tex Gas Division Addition 080.56375 38100 246,780
080 190 - Mid-Tex Gas Division Addition 080.56375 38200 149,998
080 190 - Mid-Tex Gas Division Addition 080.56375 38300 (146,903)
080 190 - Mid-Tex Gas Division Addition 080.56376 38100 311,797
080 190 - Mid-Tex Gas Division Addition 080.56376 38200 574,137
080 190 - Mid-Tex Gas Division Addition 080.56376 38300 (272,071)
080 190 - Mid-Tex Gas Division Addition 080.56377 38100 137,578
080 190 - Mid-Tex Gas Division Addition 080.56377 38200 173,653
080 190 - Mid-Tex Gas Division Addition 080.56377 38300 (65,325)
080 190 - Mid-Tex Gas Division Addition 080.56378 38100 137,866
080 190 - Mid-Tex Gas Division Addition 080.56378 38200 134,978
080 190 - Mid-Tex Gas Division Addition 080.56378 38300 (72,163)
080 190 - Mid-Tex Gas Division Addition 080.56387 37601 (74,031)
080 190 - Mid-Tex Gas Division Addition 080.56387 37602 379,555
080 190 - Mid-Tex Gas Division Addition 080.56388 37601 (696,065)
080 190 - Mid-Tex Gas Division Addition 080.56388 37602 1,939,791
080 190 - Mid-Tex Gas Division Addition 080.56389 37601 (2,016)
080 190 - Mid-Tex Gas Division Addition 080.56389 37602 4,617
080 190 - Mid-Tex Gas Division Addition 080.56390 37601 (211,940)
080 190 - Mid-Tex Gas Division Addition 080.56390 37602 612,612
080 190 - Mid-Tex Gas Division Addition 080.56391 37601 (315,760)
080 190 - Mid-Tex Gas Division Addition 080.56391 37602 1,051,540
080 190 - Mid-Tex Gas Division Addition 080.56392 37601 124,860
080 190 - Mid-Tex Gas Division Addition 080.56392 37602 561,352
080 190 - Mid-Tex Gas Division Addition 080.56393 37601 (91,977)
080 190 - Mid-Tex Gas Division Addition 080.56393 37602 317,914
080 190 - Mid-Tex Gas Division Addition 080.56394 37601 (659,572)
080 190 - Mid-Tex Gas Division Addition 080.56394 37602 2,023,561
080 190 - Mid-Tex Gas Division Addition 080.56403 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56403 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56410 37602 2
080 190 - Mid-Tex Gas Division Addition 080.56410 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56416 37602 1
080 190 - Mid-Tex Gas Division Addition 080.56416 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56416 38100 0
080 190 - Mid-Tex Gas Division Addition 080.56416 38200 0
080 190 - Mid-Tex Gas Division Addition 080.56416 38300 0
080 190 - Mid-Tex Gas Division Addition 080.56421 37602 1
080 190 - Mid-Tex Gas Division Addition 080.56421 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56422 37602 1
080 190 - Mid-Tex Gas Division Addition 080.56422 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56430 37602 28
080 190 - Mid-Tex Gas Division Addition 080.56430 38000 12
080 190 - Mid-Tex Gas Division Addition 080.56430 38100 1
080 190 - Mid-Tex Gas Division Addition 080.56430 38200 0
080 190 - Mid-Tex Gas Division Addition 080.56430 38300 0
080 190 - Mid-Tex Gas Division Addition 080.56431 37601 2
080 190 - Mid-Tex Gas Division Addition 080.56433 37602 8
080 190 - Mid-Tex Gas Division Addition 080.56433 38000 1
080 190 - Mid-Tex Gas Division Addition 080.56433 38100 0
080 190 - Mid-Tex Gas Division Addition 080.56433 38300 0
080 190 - Mid-Tex Gas Division Addition 080.56456 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.56483 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.56497 37602 3
080 190 - Mid-Tex Gas Division Addition 080.56497 38000 1
080 190 - Mid-Tex Gas Division Addition 080.56497 38100 0
080 190 - Mid-Tex Gas Division Addition 080.56497 38200 0
080 190 - Mid-Tex Gas Division Addition 080.56497 38300 0
080 190 - Mid-Tex Gas Division Addition 080.56502 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56502 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56510 37602 27
080 190 - Mid-Tex Gas Division Addition 080.56510 38000 18
080 190 - Mid-Tex Gas Division Addition 080.56538 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.56543 37602 5
080 190 - Mid-Tex Gas Division Addition 080.56543 38000 1
080 190 - Mid-Tex Gas Division Addition 080.56543 38100 0
080 190 - Mid-Tex Gas Division Addition 080.56543 38200 0
080 190 - Mid-Tex Gas Division Addition 080.56543 38300 0
080 190 - Mid-Tex Gas Division Addition 080.56544 37602 1
080 190 - Mid-Tex Gas Division Addition 080.56544 38000 1
080 190 - Mid-Tex Gas Division Addition 080.56545 37602 7
080 190 - Mid-Tex Gas Division Addition 080.56545 38000 1
080 190 - Mid-Tex Gas Division Addition 080.56556 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56556 38000 0
MTX Additions by FERC
Page 14 of 101
412
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.56567 37601 (0)
080 190 - Mid-Tex Gas Division Addition 080.56567 37800 (0)
080 190 - Mid-Tex Gas Division Addition 080.56571 37601 5,545
080 190 - Mid-Tex Gas Division Addition 080.56571 37800 115
080 190 - Mid-Tex Gas Division Addition 080.56572 37601 146
080 190 - Mid-Tex Gas Division Addition 080.56583 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.56586 37602 4
080 190 - Mid-Tex Gas Division Addition 080.56586 38000 1
080 190 - Mid-Tex Gas Division Addition 080.56593 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56593 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56598 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56611 37602 1
080 190 - Mid-Tex Gas Division Addition 080.56611 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56612 37602 6
080 190 - Mid-Tex Gas Division Addition 080.56612 38000 2
080 190 - Mid-Tex Gas Division Addition 080.56614 37602 4
080 190 - Mid-Tex Gas Division Addition 080.56614 38000 1
080 190 - Mid-Tex Gas Division Addition 080.56618 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56618 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56625 37602 103
080 190 - Mid-Tex Gas Division Addition 080.56651 37600 313
080 190 - Mid-Tex Gas Division Addition 080.56652 37602 7
080 190 - Mid-Tex Gas Division Addition 080.56662 37602 64
080 190 - Mid-Tex Gas Division Addition 080.56662 38000 10
080 190 - Mid-Tex Gas Division Addition 080.56670 37601 1,228
080 190 - Mid-Tex Gas Division Addition 080.56670 37800 4,501
080 190 - Mid-Tex Gas Division Addition 080.56680 37602 4
080 190 - Mid-Tex Gas Division Addition 080.56680 38000 2
080 190 - Mid-Tex Gas Division Addition 080.56681 37602 5
080 190 - Mid-Tex Gas Division Addition 080.56681 38000 1
080 190 - Mid-Tex Gas Division Addition 080.56685 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56686 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56686 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56717 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56717 38100 0
080 190 - Mid-Tex Gas Division Addition 080.56720 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.56722 37602 5
080 190 - Mid-Tex Gas Division Addition 080.56722 38000 1
080 190 - Mid-Tex Gas Division Addition 080.56722 38100 1
080 190 - Mid-Tex Gas Division Addition 080.56722 38200 0
080 190 - Mid-Tex Gas Division Addition 080.56722 38300 0
080 190 - Mid-Tex Gas Division Addition 080.56723 37602 (4)
080 190 - Mid-Tex Gas Division Addition 080.56723 38000 (2)
080 190 - Mid-Tex Gas Division Addition 080.56724 37602 5
080 190 - Mid-Tex Gas Division Addition 080.56724 38000 2
080 190 - Mid-Tex Gas Division Addition 080.56726 38000 1
080 190 - Mid-Tex Gas Division Addition 080.56731 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56731 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56731 38200 0
080 190 - Mid-Tex Gas Division Addition 080.56731 38300 0
080 190 - Mid-Tex Gas Division Addition 080.56735 37602 107
080 190 - Mid-Tex Gas Division Addition 080.56735 38000 117
080 190 - Mid-Tex Gas Division Addition 080.56735 38100 15
080 190 - Mid-Tex Gas Division Addition 080.56735 38200 5
080 190 - Mid-Tex Gas Division Addition 080.56735 38300 5
080 190 - Mid-Tex Gas Division Addition 080.56739 37602 1
080 190 - Mid-Tex Gas Division Addition 080.56739 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56743 37602 7
080 190 - Mid-Tex Gas Division Addition 080.56743 38000 2
080 190 - Mid-Tex Gas Division Addition 080.56747 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.56747 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.56756 37602 1
080 190 - Mid-Tex Gas Division Addition 080.56800 37601 0
080 190 - Mid-Tex Gas Division Addition 080.56800 37602 25
080 190 - Mid-Tex Gas Division Addition 080.56800 38000 1
080 190 - Mid-Tex Gas Division Addition 080.56809 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56809 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56810 37602 37
080 190 - Mid-Tex Gas Division Addition 080.56810 38000 11
080 190 - Mid-Tex Gas Division Addition 080.56810 38100 3
080 190 - Mid-Tex Gas Division Addition 080.56810 38200 1
080 190 - Mid-Tex Gas Division Addition 080.56810 38300 2
080 190 - Mid-Tex Gas Division Addition 080.56817 37601 (0)
080 190 - Mid-Tex Gas Division Addition 080.56817 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.56826 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56828 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56855 37602 7,141
080 190 - Mid-Tex Gas Division Addition 080.56855 38000 1,175
080 190 - Mid-Tex Gas Division Addition 080.56856 37602 4,166
080 190 - Mid-Tex Gas Division Addition 080.56856 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56857 37602 (894)
080 190 - Mid-Tex Gas Division Addition 080.56857 38000 (894)
080 190 - Mid-Tex Gas Division Addition 080.56858 37602 557,821
080 190 - Mid-Tex Gas Division Addition 080.56858 38000 (223,119)
080 190 - Mid-Tex Gas Division Addition 080.56860 37602 320,058
080 190 - Mid-Tex Gas Division Addition 080.56860 38000 (55,059)
080 190 - Mid-Tex Gas Division Addition 080.56861 37602 43
080 190 - Mid-Tex Gas Division Addition 080.56861 38000 (34)
080 190 - Mid-Tex Gas Division Addition 080.56862 37602 259,502
080 190 - Mid-Tex Gas Division Addition 080.56862 38000 (68,236)
080 190 - Mid-Tex Gas Division Addition 080.56863 37602 540,509
080 190 - Mid-Tex Gas Division Addition 080.56863 38000 (97,418)
080 190 - Mid-Tex Gas Division Addition 080.56864 37602 216,802
080 190 - Mid-Tex Gas Division Addition 080.56864 38000 (38,338)
080 190 - Mid-Tex Gas Division Addition 080.56865 37602 81,127
080 190 - Mid-Tex Gas Division Addition 080.56865 38000 (18,180)
080 190 - Mid-Tex Gas Division Addition 080.56866 37602 43,572
080 190 - Mid-Tex Gas Division Addition 080.56866 38000 (34,616)
080 190 - Mid-Tex Gas Division Addition 080.56867 37602 368,584
080 190 - Mid-Tex Gas Division Addition 080.56867 38000 (32,301)
080 190 - Mid-Tex Gas Division Addition 080.56869 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56869 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56870 37601 186
080 190 - Mid-Tex Gas Division Addition 080.56870 37602 40
080 190 - Mid-Tex Gas Division Addition 080.56870 38000 (147)
080 190 - Mid-Tex Gas Division Addition 080.56871 37602 30,887
080 190 - Mid-Tex Gas Division Addition 080.56871 38000 (24,445)
MTX Additions by FERC
Page 15 of 101
413
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.56872 37602 3
080 190 - Mid-Tex Gas Division Addition 080.56872 38000 3
080 190 - Mid-Tex Gas Division Addition 080.56873 37602 74,119
080 190 - Mid-Tex Gas Division Addition 080.56873 38000 (55,516)
080 190 - Mid-Tex Gas Division Addition 080.56874 37602 62,182
080 190 - Mid-Tex Gas Division Addition 080.56874 38000 (47,729)
080 190 - Mid-Tex Gas Division Addition 080.56875 37602 (8)
080 190 - Mid-Tex Gas Division Addition 080.56875 38000 (8)
080 190 - Mid-Tex Gas Division Addition 080.56876 37602 174,117
080 190 - Mid-Tex Gas Division Addition 080.56876 38000 146,949
080 190 - Mid-Tex Gas Division Addition 080.56882 37602 2
080 190 - Mid-Tex Gas Division Addition 080.56882 38000 1
080 190 - Mid-Tex Gas Division Addition 080.56882 38100 1
080 190 - Mid-Tex Gas Division Addition 080.56882 38200 1
080 190 - Mid-Tex Gas Division Addition 080.56882 38300 1
080 190 - Mid-Tex Gas Division Addition 080.56884 37602 111
080 190 - Mid-Tex Gas Division Addition 080.56884 38000 48
080 190 - Mid-Tex Gas Division Addition 080.56891 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56891 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56897 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.56904 37602 1
080 190 - Mid-Tex Gas Division Addition 080.56904 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56904 38100 0
080 190 - Mid-Tex Gas Division Addition 080.56904 38200 0
080 190 - Mid-Tex Gas Division Addition 080.56904 38300 0
080 190 - Mid-Tex Gas Division Addition 080.56917 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.56917 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.56918 37602 196
080 190 - Mid-Tex Gas Division Addition 080.56918 38000 49
080 190 - Mid-Tex Gas Division Addition 080.56919 37602 39
080 190 - Mid-Tex Gas Division Addition 080.56919 38000 32
080 190 - Mid-Tex Gas Division Addition 080.56920 37602 172
080 190 - Mid-Tex Gas Division Addition 080.56920 38000 147
080 190 - Mid-Tex Gas Division Addition 080.56921 37602 2
080 190 - Mid-Tex Gas Division Addition 080.56921 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56922 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56922 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56928 37602 1
080 190 - Mid-Tex Gas Division Addition 080.56938 37602 6
080 190 - Mid-Tex Gas Division Addition 080.56938 38000 2
080 190 - Mid-Tex Gas Division Addition 080.56949 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.56953 37601 38,744
080 190 - Mid-Tex Gas Division Addition 080.56974 37602 1
080 190 - Mid-Tex Gas Division Addition 080.56974 38000 0
080 190 - Mid-Tex Gas Division Addition 080.56975 37602 31
080 190 - Mid-Tex Gas Division Addition 080.56975 38000 3
080 190 - Mid-Tex Gas Division Addition 080.56981 38000 2
080 190 - Mid-Tex Gas Division Addition 080.56981 38500 17
080 190 - Mid-Tex Gas Division Addition 080.56988 37602 0
080 190 - Mid-Tex Gas Division Addition 080.56989 37602 2
080 190 - Mid-Tex Gas Division Addition 080.56989 38000 2
080 190 - Mid-Tex Gas Division Addition 080.56991 37602 3
080 190 - Mid-Tex Gas Division Addition 080.56991 38000 1
080 190 - Mid-Tex Gas Division Addition 080.56991 38100 0
080 190 - Mid-Tex Gas Division Addition 080.56991 38200 0
080 190 - Mid-Tex Gas Division Addition 080.56991 38300 0
080 190 - Mid-Tex Gas Division Addition 080.56995 37602 2
080 190 - Mid-Tex Gas Division Addition 080.56995 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57011 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57013 37602 3
080 190 - Mid-Tex Gas Division Addition 080.57013 38000 1
080 190 - Mid-Tex Gas Division Addition 080.57045 37601 86
080 190 - Mid-Tex Gas Division Addition 080.57053 37602 3
080 190 - Mid-Tex Gas Division Addition 080.57053 38000 2
080 190 - Mid-Tex Gas Division Addition 080.57058 37602 3
080 190 - Mid-Tex Gas Division Addition 080.57058 38000 1
080 190 - Mid-Tex Gas Division Addition 080.57061 37602 4
080 190 - Mid-Tex Gas Division Addition 080.57061 38000 (1)
080 190 - Mid-Tex Gas Division Addition 080.57061 38100 (2)
080 190 - Mid-Tex Gas Division Addition 080.57063 37602 82,391
080 190 - Mid-Tex Gas Division Addition 080.57063 38000 23,664
080 190 - Mid-Tex Gas Division Addition 080.57069 37602 4
080 190 - Mid-Tex Gas Division Addition 080.57069 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57069 38100 0
080 190 - Mid-Tex Gas Division Addition 080.57069 38200 0
080 190 - Mid-Tex Gas Division Addition 080.57069 38300 0
080 190 - Mid-Tex Gas Division Addition 080.57070 37602 13
080 190 - Mid-Tex Gas Division Addition 080.57070 38000 3
080 190 - Mid-Tex Gas Division Addition 080.57071 37602 6
080 190 - Mid-Tex Gas Division Addition 080.57071 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57072 37602 3
080 190 - Mid-Tex Gas Division Addition 080.57072 38000 3
080 190 - Mid-Tex Gas Division Addition 080.57076 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57076 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57090 37602 1
080 190 - Mid-Tex Gas Division Addition 080.57090 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57090 38100 0
080 190 - Mid-Tex Gas Division Addition 080.57090 38200 0
080 190 - Mid-Tex Gas Division Addition 080.57090 38300 0
080 190 - Mid-Tex Gas Division Addition 080.57104 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57123 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57123 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57123 38200 0
080 190 - Mid-Tex Gas Division Addition 080.57134 37602 4
080 190 - Mid-Tex Gas Division Addition 080.57134 38000 1
080 190 - Mid-Tex Gas Division Addition 080.57147 37601 2,128
080 190 - Mid-Tex Gas Division Addition 080.57147 37800 236
080 190 - Mid-Tex Gas Division Addition 080.57171 37602 118
080 190 - Mid-Tex Gas Division Addition 080.57171 38000 29
080 190 - Mid-Tex Gas Division Addition 080.57193 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57193 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57202 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57225 37800 (0)
080 190 - Mid-Tex Gas Division Addition 080.57240 37602 7
080 190 - Mid-Tex Gas Division Addition 080.57240 38000 2
080 190 - Mid-Tex Gas Division Addition 080.57247 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57248 37602 (2)
MTX Additions by FERC
Page 16 of 101
414
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.57259 37602 1
080 190 - Mid-Tex Gas Division Addition 080.57259 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57261 37602 852
080 190 - Mid-Tex Gas Division Addition 080.57261 38000 213
080 190 - Mid-Tex Gas Division Addition 080.57262 37602 1
080 190 - Mid-Tex Gas Division Addition 080.57269 37602 3
080 190 - Mid-Tex Gas Division Addition 080.57269 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57278 37602 2
080 190 - Mid-Tex Gas Division Addition 080.57278 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57278 38100 0
080 190 - Mid-Tex Gas Division Addition 080.57278 38200 0
080 190 - Mid-Tex Gas Division Addition 080.57278 38300 0
080 190 - Mid-Tex Gas Division Addition 080.57282 37602 70
080 190 - Mid-Tex Gas Division Addition 080.57285 37602 2
080 190 - Mid-Tex Gas Division Addition 080.57285 38000 4
080 190 - Mid-Tex Gas Division Addition 080.57293 37602 3
080 190 - Mid-Tex Gas Division Addition 080.57293 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57294 37602 654
080 190 - Mid-Tex Gas Division Addition 080.57294 38000 115
080 190 - Mid-Tex Gas Division Addition 080.57296 37601 (0)
080 190 - Mid-Tex Gas Division Addition 080.57296 37800 (0)
080 190 - Mid-Tex Gas Division Addition 080.57312 37602 114
080 190 - Mid-Tex Gas Division Addition 080.57312 38000 13
080 190 - Mid-Tex Gas Division Addition 080.57344 37602 31,340
080 190 - Mid-Tex Gas Division Addition 080.57348 37601 0
080 190 - Mid-Tex Gas Division Addition 080.57348 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57370 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57371 37602 2
080 190 - Mid-Tex Gas Division Addition 080.57371 38000 1
080 190 - Mid-Tex Gas Division Addition 080.57371 38100 0
080 190 - Mid-Tex Gas Division Addition 080.57371 38200 0
080 190 - Mid-Tex Gas Division Addition 080.57371 38300 0
080 190 - Mid-Tex Gas Division Addition 080.57374 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57374 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57388 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57388 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57388 38100 1
080 190 - Mid-Tex Gas Division Addition 080.57391 37602 6
080 190 - Mid-Tex Gas Division Addition 080.57391 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57392 37602 24
080 190 - Mid-Tex Gas Division Addition 080.57392 38000 7
080 190 - Mid-Tex Gas Division Addition 080.57393 37602 30
080 190 - Mid-Tex Gas Division Addition 080.57393 38000 10
080 190 - Mid-Tex Gas Division Addition 080.57396 37602 35
080 190 - Mid-Tex Gas Division Addition 080.57396 38000 9
080 190 - Mid-Tex Gas Division Addition 080.57397 37602 46
080 190 - Mid-Tex Gas Division Addition 080.57397 38000 11
080 190 - Mid-Tex Gas Division Addition 080.57399 37602 35
080 190 - Mid-Tex Gas Division Addition 080.57399 38000 5
080 190 - Mid-Tex Gas Division Addition 080.57400 37602 88
080 190 - Mid-Tex Gas Division Addition 080.57400 38000 38
080 190 - Mid-Tex Gas Division Addition 080.57402 37602 61
080 190 - Mid-Tex Gas Division Addition 080.57402 38000 31
080 190 - Mid-Tex Gas Division Addition 080.57405 37602 73
080 190 - Mid-Tex Gas Division Addition 080.57405 38000 49
080 190 - Mid-Tex Gas Division Addition 080.57406 37602 34
080 190 - Mid-Tex Gas Division Addition 080.57406 38000 14
080 190 - Mid-Tex Gas Division Addition 080.57419 37602 1
080 190 - Mid-Tex Gas Division Addition 080.57431 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.57435 37602 (11)
080 190 - Mid-Tex Gas Division Addition 080.57437 37601 113
080 190 - Mid-Tex Gas Division Addition 080.57446 37601 (0)
080 190 - Mid-Tex Gas Division Addition 080.57448 37600 15,319
080 190 - Mid-Tex Gas Division Addition 080.57448 37601 367,646
080 190 - Mid-Tex Gas Division Addition 080.57478 37601 (0)
080 190 - Mid-Tex Gas Division Addition 080.57492 37800 (0)
080 190 - Mid-Tex Gas Division Addition 080.57493 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.57497 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57497 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57498 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57498 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57499 37602 18
080 190 - Mid-Tex Gas Division Addition 080.57499 38000 6
080 190 - Mid-Tex Gas Division Addition 080.57502 37602 5
080 190 - Mid-Tex Gas Division Addition 080.57502 38000 1
080 190 - Mid-Tex Gas Division Addition 080.57503 37602 8
080 190 - Mid-Tex Gas Division Addition 080.57503 38000 3
080 190 - Mid-Tex Gas Division Addition 080.57508 37602 5
080 190 - Mid-Tex Gas Division Addition 080.57508 38000 20
080 190 - Mid-Tex Gas Division Addition 080.57509 37602 1
080 190 - Mid-Tex Gas Division Addition 080.57509 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57510 37602 1
080 190 - Mid-Tex Gas Division Addition 080.57510 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57525 37602 43
080 190 - Mid-Tex Gas Division Addition 080.57525 38000 51
080 190 - Mid-Tex Gas Division Addition 080.57528 37602 105
080 190 - Mid-Tex Gas Division Addition 080.57528 38000 19
080 190 - Mid-Tex Gas Division Addition 080.57529 37602 1
080 190 - Mid-Tex Gas Division Addition 080.57529 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57540 37602 16
080 190 - Mid-Tex Gas Division Addition 080.57540 38000 4
080 190 - Mid-Tex Gas Division Addition 080.57549 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57549 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57551 37602 23
080 190 - Mid-Tex Gas Division Addition 080.57551 38000 6
080 190 - Mid-Tex Gas Division Addition 080.57552 37602 5
080 190 - Mid-Tex Gas Division Addition 080.57552 38000 2
080 190 - Mid-Tex Gas Division Addition 080.57568 37602 125
080 190 - Mid-Tex Gas Division Addition 080.57579 37602 2
080 190 - Mid-Tex Gas Division Addition 080.57579 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57580 37602 4
080 190 - Mid-Tex Gas Division Addition 080.57580 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57580 38100 0
080 190 - Mid-Tex Gas Division Addition 080.57580 38200 0
080 190 - Mid-Tex Gas Division Addition 080.57580 38300 0
080 190 - Mid-Tex Gas Division Addition 080.57607 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57607 38000 0
MTX Additions by FERC
Page 17 of 101
415
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.57607 38200 0
080 190 - Mid-Tex Gas Division Addition 080.57615 38000 10
080 190 - Mid-Tex Gas Division Addition 080.57615 38100 2
080 190 - Mid-Tex Gas Division Addition 080.57615 38200 1
080 190 - Mid-Tex Gas Division Addition 080.57615 38300 1
080 190 - Mid-Tex Gas Division Addition 080.57629 37800 14
080 190 - Mid-Tex Gas Division Addition 080.57630 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.57632 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.57658 37602 47
080 190 - Mid-Tex Gas Division Addition 080.57658 38000 30
080 190 - Mid-Tex Gas Division Addition 080.57665 37601 37
080 190 - Mid-Tex Gas Division Addition 080.57665 37800 129
080 190 - Mid-Tex Gas Division Addition 080.57672 37602 5
080 190 - Mid-Tex Gas Division Addition 080.57672 38000 3
080 190 - Mid-Tex Gas Division Addition 080.57675 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57675 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57679 37602 69
080 190 - Mid-Tex Gas Division Addition 080.57679 38000 66
080 190 - Mid-Tex Gas Division Addition 080.57693 37601 9
080 190 - Mid-Tex Gas Division Addition 080.57697 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.57703 37600 0
080 190 - Mid-Tex Gas Division Addition 080.57703 37601 2
080 190 - Mid-Tex Gas Division Addition 080.57711 37602 1
080 190 - Mid-Tex Gas Division Addition 080.57716 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.57725 37602 65
080 190 - Mid-Tex Gas Division Addition 080.57725 38000 43
080 190 - Mid-Tex Gas Division Addition 080.57729 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57729 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57747 37602 6
080 190 - Mid-Tex Gas Division Addition 080.57747 38000 3
080 190 - Mid-Tex Gas Division Addition 080.57753 37602 1
080 190 - Mid-Tex Gas Division Addition 080.57753 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57754 37602 52
080 190 - Mid-Tex Gas Division Addition 080.57754 38000 17
080 190 - Mid-Tex Gas Division Addition 080.57755 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57756 37601 2
080 190 - Mid-Tex Gas Division Addition 080.57756 37602 2
080 190 - Mid-Tex Gas Division Addition 080.57756 37800 29
080 190 - Mid-Tex Gas Division Addition 080.57757 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.57758 37602 1
080 190 - Mid-Tex Gas Division Addition 080.57758 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57763 37602 1
080 190 - Mid-Tex Gas Division Addition 080.57763 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57767 37602 10
080 190 - Mid-Tex Gas Division Addition 080.57767 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57767 38100 0
080 190 - Mid-Tex Gas Division Addition 080.57767 38200 0
080 190 - Mid-Tex Gas Division Addition 080.57767 38300 0
080 190 - Mid-Tex Gas Division Addition 080.57795 37602 29
080 190 - Mid-Tex Gas Division Addition 080.57795 38000 5
080 190 - Mid-Tex Gas Division Addition 080.57796 37602 15
080 190 - Mid-Tex Gas Division Addition 080.57796 38000 5
080 190 - Mid-Tex Gas Division Addition 080.57800 37602 36
080 190 - Mid-Tex Gas Division Addition 080.57800 38000 1
080 190 - Mid-Tex Gas Division Addition 080.57809 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.57818 37602 1
080 190 - Mid-Tex Gas Division Addition 080.57818 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57820 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.57823 37602 43
080 190 - Mid-Tex Gas Division Addition 080.57823 38000 29
080 190 - Mid-Tex Gas Division Addition 080.57824 37601 230
080 190 - Mid-Tex Gas Division Addition 080.57824 37800 41
080 190 - Mid-Tex Gas Division Addition 080.57848 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57852 37602 4
080 190 - Mid-Tex Gas Division Addition 080.57852 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57856 37602 49
080 190 - Mid-Tex Gas Division Addition 080.57856 38000 30
080 190 - Mid-Tex Gas Division Addition 080.57859 37602 58
080 190 - Mid-Tex Gas Division Addition 080.57859 38000 39
080 190 - Mid-Tex Gas Division Addition 080.57861 37602 269
080 190 - Mid-Tex Gas Division Addition 080.57861 38000 67
080 190 - Mid-Tex Gas Division Addition 080.57866 37602 49
080 190 - Mid-Tex Gas Division Addition 080.57866 38000 12
080 190 - Mid-Tex Gas Division Addition 080.57874 37602 93
080 190 - Mid-Tex Gas Division Addition 080.57874 38000 12
080 190 - Mid-Tex Gas Division Addition 080.57877 37601 79
080 190 - Mid-Tex Gas Division Addition 080.57879 37800 33
080 190 - Mid-Tex Gas Division Addition 080.57902 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57904 37602 2
080 190 - Mid-Tex Gas Division Addition 080.57904 38000 2
080 190 - Mid-Tex Gas Division Addition 080.57908 37602 60
080 190 - Mid-Tex Gas Division Addition 080.57908 38000 23
080 190 - Mid-Tex Gas Division Addition 080.57909 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.57914 37602 17
080 190 - Mid-Tex Gas Division Addition 080.57914 38000 18
080 190 - Mid-Tex Gas Division Addition 080.57915 37602 51
080 190 - Mid-Tex Gas Division Addition 080.57915 38000 36
080 190 - Mid-Tex Gas Division Addition 080.57916 37602 0
080 190 - Mid-Tex Gas Division Addition 080.57924 37602 3
080 190 - Mid-Tex Gas Division Addition 080.57924 38000 1
080 190 - Mid-Tex Gas Division Addition 080.57926 37602 31
080 190 - Mid-Tex Gas Division Addition 080.57926 38000 3
080 190 - Mid-Tex Gas Division Addition 080.57929 37602 4
080 190 - Mid-Tex Gas Division Addition 080.57929 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57932 37602 1
080 190 - Mid-Tex Gas Division Addition 080.57932 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57938 37602 854
080 190 - Mid-Tex Gas Division Addition 080.57938 38000 214
080 190 - Mid-Tex Gas Division Addition 080.57940 37602 13
080 190 - Mid-Tex Gas Division Addition 080.57941 37602 13
080 190 - Mid-Tex Gas Division Addition 080.57941 38000 1
080 190 - Mid-Tex Gas Division Addition 080.57944 37602 8
080 190 - Mid-Tex Gas Division Addition 080.57944 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57954 37602 8
080 190 - Mid-Tex Gas Division Addition 080.57954 38000 2
080 190 - Mid-Tex Gas Division Addition 080.57959 37602 1
080 190 - Mid-Tex Gas Division Addition 080.57959 38000 0
MTX Additions by FERC
Page 18 of 101
416
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.57960 37602 12
080 190 - Mid-Tex Gas Division Addition 080.57960 38000 6
080 190 - Mid-Tex Gas Division Addition 080.57963 37602 6
080 190 - Mid-Tex Gas Division Addition 080.57963 38000 1
080 190 - Mid-Tex Gas Division Addition 080.57964 37601 110
080 190 - Mid-Tex Gas Division Addition 080.57971 37602 29
080 190 - Mid-Tex Gas Division Addition 080.57971 38000 0
080 190 - Mid-Tex Gas Division Addition 080.57983 37601 112,957
080 190 - Mid-Tex Gas Division Addition 080.57983 37602 26,895
080 190 - Mid-Tex Gas Division Addition 080.57983 37800 129,093
080 190 - Mid-Tex Gas Division Addition 080.57985 37601 77,493
080 190 - Mid-Tex Gas Division Addition 080.57986 37601 56,805
080 190 - Mid-Tex Gas Division Addition 080.57986 37800 1,515
080 190 - Mid-Tex Gas Division Addition 080.57990 37800 23
080 190 - Mid-Tex Gas Division Addition 080.57991 37602 7
080 190 - Mid-Tex Gas Division Addition 080.57991 38000 1
080 190 - Mid-Tex Gas Division Addition 080.57992 37602 6
080 190 - Mid-Tex Gas Division Addition 080.57992 38000 4
080 190 - Mid-Tex Gas Division Addition 080.57993 37602 32
080 190 - Mid-Tex Gas Division Addition 080.57993 38000 22
080 190 - Mid-Tex Gas Division Addition 080.57997 37602 86
080 190 - Mid-Tex Gas Division Addition 080.57997 38000 39
080 190 - Mid-Tex Gas Division Addition 080.58003 37602 1
080 190 - Mid-Tex Gas Division Addition 080.58003 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58009 37602 17
080 190 - Mid-Tex Gas Division Addition 080.58009 38000 7
080 190 - Mid-Tex Gas Division Addition 080.58012 37602 22
080 190 - Mid-Tex Gas Division Addition 080.58012 38000 5
080 190 - Mid-Tex Gas Division Addition 080.58013 37602 (19)
080 190 - Mid-Tex Gas Division Addition 080.58013 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.58020 37602 63
080 190 - Mid-Tex Gas Division Addition 080.58020 38000 34
080 190 - Mid-Tex Gas Division Addition 080.58023 37602 25
080 190 - Mid-Tex Gas Division Addition 080.58023 38000 21
080 190 - Mid-Tex Gas Division Addition 080.58024 37602 225
080 190 - Mid-Tex Gas Division Addition 080.58024 38000 98
080 190 - Mid-Tex Gas Division Addition 080.58026 37601 10
080 190 - Mid-Tex Gas Division Addition 080.58026 38000 6
080 190 - Mid-Tex Gas Division Addition 080.58027 37602 58
080 190 - Mid-Tex Gas Division Addition 080.58027 38000 5
080 190 - Mid-Tex Gas Division Addition 080.58029 37602 12
080 190 - Mid-Tex Gas Division Addition 080.58029 38000 7
080 190 - Mid-Tex Gas Division Addition 080.58034 37602 7
080 190 - Mid-Tex Gas Division Addition 080.58034 38000 1
080 190 - Mid-Tex Gas Division Addition 080.58036 37602 29
080 190 - Mid-Tex Gas Division Addition 080.58036 38000 16
080 190 - Mid-Tex Gas Division Addition 080.58037 37602 125
080 190 - Mid-Tex Gas Division Addition 080.58037 38000 67
080 190 - Mid-Tex Gas Division Addition 080.58038 37602 48
080 190 - Mid-Tex Gas Division Addition 080.58038 38000 33
080 190 - Mid-Tex Gas Division Addition 080.58040 37602 23
080 190 - Mid-Tex Gas Division Addition 080.58040 38000 15
080 190 - Mid-Tex Gas Division Addition 080.58042 37602 24
080 190 - Mid-Tex Gas Division Addition 080.58042 38000 16
080 190 - Mid-Tex Gas Division Addition 080.58051 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.58052 37602 11
080 190 - Mid-Tex Gas Division Addition 080.58052 38000 1
080 190 - Mid-Tex Gas Division Addition 080.58054 37602 29
080 190 - Mid-Tex Gas Division Addition 080.58054 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58055 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.58056 38000 2
080 190 - Mid-Tex Gas Division Addition 080.58060 37602 121
080 190 - Mid-Tex Gas Division Addition 080.58060 38000 13
080 190 - Mid-Tex Gas Division Addition 080.58061 38000 88
080 190 - Mid-Tex Gas Division Addition 080.58085 37602 55
080 190 - Mid-Tex Gas Division Addition 080.58085 38000 15
080 190 - Mid-Tex Gas Division Addition 080.58086 37602 64
080 190 - Mid-Tex Gas Division Addition 080.58086 38000 11
080 190 - Mid-Tex Gas Division Addition 080.58087 38000 4
080 190 - Mid-Tex Gas Division Addition 080.58088 38000 192
080 190 - Mid-Tex Gas Division Addition 080.58099 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.58099 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.58100 37602 2,058
080 190 - Mid-Tex Gas Division Addition 080.58100 38000 686
080 190 - Mid-Tex Gas Division Addition 080.58101 37602 31
080 190 - Mid-Tex Gas Division Addition 080.58101 38000 9
080 190 - Mid-Tex Gas Division Addition 080.58103 37602 28
080 190 - Mid-Tex Gas Division Addition 080.58103 38000 8
080 190 - Mid-Tex Gas Division Addition 080.58104 37602 7
080 190 - Mid-Tex Gas Division Addition 080.58104 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58105 37602 186
080 190 - Mid-Tex Gas Division Addition 080.58105 38000 4
080 190 - Mid-Tex Gas Division Addition 080.58107 37602 17
080 190 - Mid-Tex Gas Division Addition 080.58107 38000 3
080 190 - Mid-Tex Gas Division Addition 080.58109 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.58110 37602 5
080 190 - Mid-Tex Gas Division Addition 080.58110 37800 4
080 190 - Mid-Tex Gas Division Addition 080.58112 37602 (4)
080 190 - Mid-Tex Gas Division Addition 080.58113 37602 1
080 190 - Mid-Tex Gas Division Addition 080.58113 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58115 38000 11
080 190 - Mid-Tex Gas Division Addition 080.58117 37602 53
080 190 - Mid-Tex Gas Division Addition 080.58117 38000 6
080 190 - Mid-Tex Gas Division Addition 080.58119 37602 1
080 190 - Mid-Tex Gas Division Addition 080.58119 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58131 37602 3
080 190 - Mid-Tex Gas Division Addition 080.58147 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.58149 37602 13
080 190 - Mid-Tex Gas Division Addition 080.58153 37602 38
080 190 - Mid-Tex Gas Division Addition 080.58153 38000 1
080 190 - Mid-Tex Gas Division Addition 080.58154 37602 386
080 190 - Mid-Tex Gas Division Addition 080.58154 38000 129
080 190 - Mid-Tex Gas Division Addition 080.58158 37601 57
080 190 - Mid-Tex Gas Division Addition 080.58159 37602 114
080 190 - Mid-Tex Gas Division Addition 080.58159 38000 21
080 190 - Mid-Tex Gas Division Addition 080.58161 37602 56
080 190 - Mid-Tex Gas Division Addition 080.58161 38000 12
MTX Additions by FERC
Page 19 of 101
417
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.58162 38000 30
080 190 - Mid-Tex Gas Division Addition 080.58167 37602 57
080 190 - Mid-Tex Gas Division Addition 080.58167 38000 3
080 190 - Mid-Tex Gas Division Addition 080.58169 37601 2
080 190 - Mid-Tex Gas Division Addition 080.58169 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58172 38000 12
080 190 - Mid-Tex Gas Division Addition 080.58174 37602 17
080 190 - Mid-Tex Gas Division Addition 080.58192 37800 (0)
080 190 - Mid-Tex Gas Division Addition 080.58195 37602 1
080 190 - Mid-Tex Gas Division Addition 080.58195 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58204 37602 3
080 190 - Mid-Tex Gas Division Addition 080.58204 38000 1
080 190 - Mid-Tex Gas Division Addition 080.58212 37602 19
080 190 - Mid-Tex Gas Division Addition 080.58217 37602 70
080 190 - Mid-Tex Gas Division Addition 080.58217 38000 8
080 190 - Mid-Tex Gas Division Addition 080.58218 37602 23
080 190 - Mid-Tex Gas Division Addition 080.58225 37602 37
080 190 - Mid-Tex Gas Division Addition 080.58225 38000 12
080 190 - Mid-Tex Gas Division Addition 080.58229 37602 1
080 190 - Mid-Tex Gas Division Addition 080.58229 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58233 37602 2
080 190 - Mid-Tex Gas Division Addition 080.58233 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58234 37601 0
080 190 - Mid-Tex Gas Division Addition 080.58242 37602 5
080 190 - Mid-Tex Gas Division Addition 080.58242 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58252 37602 6
080 190 - Mid-Tex Gas Division Addition 080.58252 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58254 37602 7
080 190 - Mid-Tex Gas Division Addition 080.58258 37602 6
080 190 - Mid-Tex Gas Division Addition 080.58258 38000 6
080 190 - Mid-Tex Gas Division Addition 080.58265 37602 40
080 190 - Mid-Tex Gas Division Addition 080.58265 38000 8
080 190 - Mid-Tex Gas Division Addition 080.58267 37602 112
080 190 - Mid-Tex Gas Division Addition 080.58267 38000 6
080 190 - Mid-Tex Gas Division Addition 080.58276 37602 48
080 190 - Mid-Tex Gas Division Addition 080.58276 38000 12
080 190 - Mid-Tex Gas Division Addition 080.58306 37602 28
080 190 - Mid-Tex Gas Division Addition 080.58306 38000 7
080 190 - Mid-Tex Gas Division Addition 080.58320 37602 3
080 190 - Mid-Tex Gas Division Addition 080.58320 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58327 37602 36
080 190 - Mid-Tex Gas Division Addition 080.58327 38000 2
080 190 - Mid-Tex Gas Division Addition 080.58329 37602 20
080 190 - Mid-Tex Gas Division Addition 080.58329 38000 2
080 190 - Mid-Tex Gas Division Addition 080.58330 37602 4
080 190 - Mid-Tex Gas Division Addition 080.58330 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58340 37602 0
080 190 - Mid-Tex Gas Division Addition 080.58359 37602 112
080 190 - Mid-Tex Gas Division Addition 080.58359 38000 28
080 190 - Mid-Tex Gas Division Addition 080.58361 37602 88
080 190 - Mid-Tex Gas Division Addition 080.58361 38000 11
080 190 - Mid-Tex Gas Division Addition 080.58372 37602 1,649
080 190 - Mid-Tex Gas Division Addition 080.58373 37601 22
080 190 - Mid-Tex Gas Division Addition 080.58373 37602 2
080 190 - Mid-Tex Gas Division Addition 080.58373 37800 175
080 190 - Mid-Tex Gas Division Addition 080.58384 37602 0
080 190 - Mid-Tex Gas Division Addition 080.58387 37602 7
080 190 - Mid-Tex Gas Division Addition 080.58387 38000 1
080 190 - Mid-Tex Gas Division Addition 080.58413 37602 5,155
080 190 - Mid-Tex Gas Division Addition 080.58429 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.58444 37602 33
080 190 - Mid-Tex Gas Division Addition 080.58451 37602 4,796
080 190 - Mid-Tex Gas Division Addition 080.58451 38000 1,199
080 190 - Mid-Tex Gas Division Addition 080.58452 38000 9
080 190 - Mid-Tex Gas Division Addition 080.58460 37602 0
080 190 - Mid-Tex Gas Division Addition 080.58460 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58462 37602 1,032
080 190 - Mid-Tex Gas Division Addition 080.58462 38000 102
080 190 - Mid-Tex Gas Division Addition 080.58469 37602 33
080 190 - Mid-Tex Gas Division Addition 080.58480 37602 3
080 190 - Mid-Tex Gas Division Addition 080.58484 37602 68
080 190 - Mid-Tex Gas Division Addition 080.58485 38000 29
080 190 - Mid-Tex Gas Division Addition 080.58490 37602 40
080 190 - Mid-Tex Gas Division Addition 080.58490 38000 1
080 190 - Mid-Tex Gas Division Addition 080.58494 37602 1
080 190 - Mid-Tex Gas Division Addition 080.58499 37602 20
080 190 - Mid-Tex Gas Division Addition 080.58508 37602 3,299
080 190 - Mid-Tex Gas Division Addition 080.58509 37602 2
080 190 - Mid-Tex Gas Division Addition 080.58509 38000 2
080 190 - Mid-Tex Gas Division Addition 080.58514 37602 56
080 190 - Mid-Tex Gas Division Addition 080.58514 38000 3
080 190 - Mid-Tex Gas Division Addition 080.58515 37602 2
080 190 - Mid-Tex Gas Division Addition 080.58544 37602 3,299
080 190 - Mid-Tex Gas Division Addition 080.58545 37602 49
080 190 - Mid-Tex Gas Division Addition 080.58545 38000 11
080 190 - Mid-Tex Gas Division Addition 080.58551 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.58564 37602 0
080 190 - Mid-Tex Gas Division Addition 080.58564 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58577 37602 76
080 190 - Mid-Tex Gas Division Addition 080.58577 38000 2
080 190 - Mid-Tex Gas Division Addition 080.58583 37601 8
080 190 - Mid-Tex Gas Division Addition 080.58587 37602 1
080 190 - Mid-Tex Gas Division Addition 080.58587 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58590 37601 651
080 190 - Mid-Tex Gas Division Addition 080.58593 37602 29
080 190 - Mid-Tex Gas Division Addition 080.58593 38000 18
080 190 - Mid-Tex Gas Division Addition 080.58594 37602 10
080 190 - Mid-Tex Gas Division Addition 080.58594 38000 3
080 190 - Mid-Tex Gas Division Addition 080.58598 37601 92
080 190 - Mid-Tex Gas Division Addition 080.58598 37800 83
080 190 - Mid-Tex Gas Division Addition 080.58608 37602 3
080 190 - Mid-Tex Gas Division Addition 080.58610 37602 7
080 190 - Mid-Tex Gas Division Addition 080.58618 37602 28
080 190 - Mid-Tex Gas Division Addition 080.58618 38000 7
080 190 - Mid-Tex Gas Division Addition 080.58619 37602 86
080 190 - Mid-Tex Gas Division Addition 080.58619 38000 28
080 190 - Mid-Tex Gas Division Addition 080.58620 37602 44
MTX Additions by FERC
Page 20 of 101
418
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.58620 38000 15
080 190 - Mid-Tex Gas Division Addition 080.58621 37602 6
080 190 - Mid-Tex Gas Division Addition 080.58621 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58622 37602 14
080 190 - Mid-Tex Gas Division Addition 080.58622 38000 4
080 190 - Mid-Tex Gas Division Addition 080.58630 37602 26
080 190 - Mid-Tex Gas Division Addition 080.58634 37602 31
080 190 - Mid-Tex Gas Division Addition 080.58634 38000 13
080 190 - Mid-Tex Gas Division Addition 080.58635 37602 22
080 190 - Mid-Tex Gas Division Addition 080.58635 38000 4
080 190 - Mid-Tex Gas Division Addition 080.58639 37602 685
080 190 - Mid-Tex Gas Division Addition 080.58639 38000 121
080 190 - Mid-Tex Gas Division Addition 080.58640 37602 121
080 190 - Mid-Tex Gas Division Addition 080.58640 38000 81
080 190 - Mid-Tex Gas Division Addition 080.58646 37602 3
080 190 - Mid-Tex Gas Division Addition 080.58646 38000 1
080 190 - Mid-Tex Gas Division Addition 080.58658 37602 5,102
080 190 - Mid-Tex Gas Division Addition 080.58658 38000 269
080 190 - Mid-Tex Gas Division Addition 080.58669 37602 4
080 190 - Mid-Tex Gas Division Addition 080.58670 37602 13
080 190 - Mid-Tex Gas Division Addition 080.58670 38000 1
080 190 - Mid-Tex Gas Division Addition 080.58684 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.58691 37602 91
080 190 - Mid-Tex Gas Division Addition 080.58691 38000 5
080 190 - Mid-Tex Gas Division Addition 080.58692 37602 16,370
080 190 - Mid-Tex Gas Division Addition 080.58692 38000 862
080 190 - Mid-Tex Gas Division Addition 080.58693 37602 2
080 190 - Mid-Tex Gas Division Addition 080.58693 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58694 37602 4
080 190 - Mid-Tex Gas Division Addition 080.58708 37602 72
080 190 - Mid-Tex Gas Division Addition 080.58708 38000 31
080 190 - Mid-Tex Gas Division Addition 080.58712 37602 36
080 190 - Mid-Tex Gas Division Addition 080.58712 38000 9
080 190 - Mid-Tex Gas Division Addition 080.58713 37602 0
080 190 - Mid-Tex Gas Division Addition 080.58714 37602 3
080 190 - Mid-Tex Gas Division Addition 080.58723 37602 5
080 190 - Mid-Tex Gas Division Addition 080.58726 37602 520
080 190 - Mid-Tex Gas Division Addition 080.58733 37602 5
080 190 - Mid-Tex Gas Division Addition 080.58733 38000 1
080 190 - Mid-Tex Gas Division Addition 080.58734 37602 77
080 190 - Mid-Tex Gas Division Addition 080.58734 38000 28
080 190 - Mid-Tex Gas Division Addition 080.58735 37602 23
080 190 - Mid-Tex Gas Division Addition 080.58735 38000 3
080 190 - Mid-Tex Gas Division Addition 080.58737 37601 0
080 190 - Mid-Tex Gas Division Addition 080.58738 37602 17
080 190 - Mid-Tex Gas Division Addition 080.58738 38000 1
080 190 - Mid-Tex Gas Division Addition 080.58740 37602 7,010
080 190 - Mid-Tex Gas Division Addition 080.58747 39906 -
080 190 - Mid-Tex Gas Division Addition 080.58748 38000 63
080 190 - Mid-Tex Gas Division Addition 080.58750 37602 76
080 190 - Mid-Tex Gas Division Addition 080.58750 38000 6
080 190 - Mid-Tex Gas Division Addition 080.58751 37602 86
080 190 - Mid-Tex Gas Division Addition 080.58753 37602 8,163
080 190 - Mid-Tex Gas Division Addition 080.58753 38000 907
080 190 - Mid-Tex Gas Division Addition 080.58755 37602 60
080 190 - Mid-Tex Gas Division Addition 080.58756 37602 103
080 190 - Mid-Tex Gas Division Addition 080.58756 38000 17
080 190 - Mid-Tex Gas Division Addition 080.58788 37602 981
080 190 - Mid-Tex Gas Division Addition 080.58788 38000 327
080 190 - Mid-Tex Gas Division Addition 080.58791 37602 2,520
080 190 - Mid-Tex Gas Division Addition 080.58791 38000 634
080 190 - Mid-Tex Gas Division Addition 080.58792 37602 (146)
080 190 - Mid-Tex Gas Division Addition 080.58792 38000 (17)
080 190 - Mid-Tex Gas Division Addition 080.58796 38000 13
080 190 - Mid-Tex Gas Division Addition 080.58797 37602 80
080 190 - Mid-Tex Gas Division Addition 080.58797 38000 9
080 190 - Mid-Tex Gas Division Addition 080.58798 37602 20
080 190 - Mid-Tex Gas Division Addition 080.58798 38000 1
080 190 - Mid-Tex Gas Division Addition 080.58800 37602 19,854
080 190 - Mid-Tex Gas Division Addition 080.58800 38000 10,680
080 190 - Mid-Tex Gas Division Addition 080.58801 37602 26
080 190 - Mid-Tex Gas Division Addition 080.58801 38000 1
080 190 - Mid-Tex Gas Division Addition 080.58806 37602 497
080 190 - Mid-Tex Gas Division Addition 080.58807 38000 3,886
080 190 - Mid-Tex Gas Division Addition 080.58815 37602 3,093
080 190 - Mid-Tex Gas Division Addition 080.58816 37602 2,062
080 190 - Mid-Tex Gas Division Addition 080.58817 37602 2,268
080 190 - Mid-Tex Gas Division Addition 080.58824 37602 15
080 190 - Mid-Tex Gas Division Addition 080.58824 38000 7
080 190 - Mid-Tex Gas Division Addition 080.58830 37601 115
080 190 - Mid-Tex Gas Division Addition 080.58830 37602 29
080 190 - Mid-Tex Gas Division Addition 080.58831 37602 59
080 190 - Mid-Tex Gas Division Addition 080.58831 38000 15
080 190 - Mid-Tex Gas Division Addition 080.58834 37602 21,998
080 190 - Mid-Tex Gas Division Addition 080.58834 38000 5,500
080 190 - Mid-Tex Gas Division Addition 080.58837 37602 6,028
080 190 - Mid-Tex Gas Division Addition 080.58837 38000 2,583
080 190 - Mid-Tex Gas Division Addition 080.58849 37602 0
080 190 - Mid-Tex Gas Division Addition 080.58860 37602 13
080 190 - Mid-Tex Gas Division Addition 080.58860 38000 2
080 190 - Mid-Tex Gas Division Addition 080.58863 37602 81
080 190 - Mid-Tex Gas Division Addition 080.58866 37602 269
080 190 - Mid-Tex Gas Division Addition 080.58866 38000 133
080 190 - Mid-Tex Gas Division Addition 080.58867 37602 63
080 190 - Mid-Tex Gas Division Addition 080.58867 38000 3
080 190 - Mid-Tex Gas Division Addition 080.58871 37602 440
080 190 - Mid-Tex Gas Division Addition 080.58871 38000 23
080 190 - Mid-Tex Gas Division Addition 080.58872 37602 6,377
080 190 - Mid-Tex Gas Division Addition 080.58872 38000 708
080 190 - Mid-Tex Gas Division Addition 080.58878 37602 28
080 190 - Mid-Tex Gas Division Addition 080.58878 38000 8
080 190 - Mid-Tex Gas Division Addition 080.58879 37601 138
080 190 - Mid-Tex Gas Division Addition 080.58879 38000 15
080 190 - Mid-Tex Gas Division Addition 080.58880 37602 32
080 190 - Mid-Tex Gas Division Addition 080.58880 38000 7
080 190 - Mid-Tex Gas Division Addition 080.58881 37602 667
080 190 - Mid-Tex Gas Division Addition 080.58881 38000 118
MTX Additions by FERC
Page 21 of 101
419
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.58882 37602 187
080 190 - Mid-Tex Gas Division Addition 080.58882 38000 10
080 190 - Mid-Tex Gas Division Addition 080.58883 37602 234
080 190 - Mid-Tex Gas Division Addition 080.58883 38000 12
080 190 - Mid-Tex Gas Division Addition 080.58888 37602 31
080 190 - Mid-Tex Gas Division Addition 080.58888 38000 21
080 190 - Mid-Tex Gas Division Addition 080.58890 37602 129
080 190 - Mid-Tex Gas Division Addition 080.58890 38000 14
080 190 - Mid-Tex Gas Division Addition 080.58891 37602 20
080 190 - Mid-Tex Gas Division Addition 080.58891 38000 19
080 190 - Mid-Tex Gas Division Addition 080.58895 37602 0
080 190 - Mid-Tex Gas Division Addition 080.58895 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58896 37601 2
080 190 - Mid-Tex Gas Division Addition 080.58896 38000 0
080 190 - Mid-Tex Gas Division Addition 080.58899 37602 31
080 190 - Mid-Tex Gas Division Addition 080.58899 38000 3
080 190 - Mid-Tex Gas Division Addition 080.58900 37602 35
080 190 - Mid-Tex Gas Division Addition 080.58900 38000 23
080 190 - Mid-Tex Gas Division Addition 080.58901 37602 18
080 190 - Mid-Tex Gas Division Addition 080.58901 38000 12
080 190 - Mid-Tex Gas Division Addition 080.58903 37602 69
080 190 - Mid-Tex Gas Division Addition 080.58903 38000 8
080 190 - Mid-Tex Gas Division Addition 080.58907 37602 299
080 190 - Mid-Tex Gas Division Addition 080.58907 38000 33
080 190 - Mid-Tex Gas Division Addition 080.58911 37602 7
080 190 - Mid-Tex Gas Division Addition 080.58921 37602 29
080 190 - Mid-Tex Gas Division Addition 080.58921 38000 2
080 190 - Mid-Tex Gas Division Addition 080.58928 37602 40
080 190 - Mid-Tex Gas Division Addition 080.58928 38000 40
080 190 - Mid-Tex Gas Division Addition 080.58929 37602 4,657
080 190 - Mid-Tex Gas Division Addition 080.58929 38000 1,164
080 190 - Mid-Tex Gas Division Addition 080.58942 37602 63
080 190 - Mid-Tex Gas Division Addition 080.58942 38000 35
080 190 - Mid-Tex Gas Division Addition 080.58945 37602 34
080 190 - Mid-Tex Gas Division Addition 080.58945 38000 22
080 190 - Mid-Tex Gas Division Addition 080.58946 37602 28
080 190 - Mid-Tex Gas Division Addition 080.58946 38000 15
080 190 - Mid-Tex Gas Division Addition 080.58951 37602 1,180
080 190 - Mid-Tex Gas Division Addition 080.58951 38000 432
080 190 - Mid-Tex Gas Division Addition 080.58952 37602 6
080 190 - Mid-Tex Gas Division Addition 080.58961 37602 530
080 190 - Mid-Tex Gas Division Addition 080.58961 38000 94
080 190 - Mid-Tex Gas Division Addition 080.58965 37602 33
080 190 - Mid-Tex Gas Division Addition 080.58965 38000 22
080 190 - Mid-Tex Gas Division Addition 080.58969 37602 522
080 190 - Mid-Tex Gas Division Addition 080.58969 38000 29
080 190 - Mid-Tex Gas Division Addition 080.58970 37602 36
080 190 - Mid-Tex Gas Division Addition 080.58970 38000 67
080 190 - Mid-Tex Gas Division Addition 080.58974 38000 97
080 190 - Mid-Tex Gas Division Addition 080.58976 37602 50
080 190 - Mid-Tex Gas Division Addition 080.58976 38000 6
080 190 - Mid-Tex Gas Division Addition 080.58978 37602 10
080 190 - Mid-Tex Gas Division Addition 080.58978 38000 1
080 190 - Mid-Tex Gas Division Addition 080.58980 37602 145
080 190 - Mid-Tex Gas Division Addition 080.58980 38000 109
080 190 - Mid-Tex Gas Division Addition 080.58982 37602 15
080 190 - Mid-Tex Gas Division Addition 080.58991 37602 1
080 190 - Mid-Tex Gas Division Addition 080.58999 37602 863
080 190 - Mid-Tex Gas Division Addition 080.58999 38000 346
080 190 - Mid-Tex Gas Division Addition 080.59003 37602 1
080 190 - Mid-Tex Gas Division Addition 080.59003 38000 0
080 190 - Mid-Tex Gas Division Addition 080.59007 37602 31
080 190 - Mid-Tex Gas Division Addition 080.59007 38000 16
080 190 - Mid-Tex Gas Division Addition 080.59008 37602 46
080 190 - Mid-Tex Gas Division Addition 080.59008 38000 5
080 190 - Mid-Tex Gas Division Addition 080.59014 37602 29
080 190 - Mid-Tex Gas Division Addition 080.59014 38000 12
080 190 - Mid-Tex Gas Division Addition 080.59016 37602 24
080 190 - Mid-Tex Gas Division Addition 080.59016 38000 23
080 190 - Mid-Tex Gas Division Addition 080.59020 37602 6,228
080 190 - Mid-Tex Gas Division Addition 080.59020 38000 328
080 190 - Mid-Tex Gas Division Addition 080.59021 38000 113
080 190 - Mid-Tex Gas Division Addition 080.59031 37602 113
080 190 - Mid-Tex Gas Division Addition 080.59031 38000 6
080 190 - Mid-Tex Gas Division Addition 080.59039 37800 2
080 190 - Mid-Tex Gas Division Addition 080.59050 37602 21
080 190 - Mid-Tex Gas Division Addition 080.59051 37602 125
080 190 - Mid-Tex Gas Division Addition 080.59051 38000 125
080 190 - Mid-Tex Gas Division Addition 080.59052 37602 12
080 190 - Mid-Tex Gas Division Addition 080.59054 37602 8
080 190 - Mid-Tex Gas Division Addition 080.59054 38000 1
080 190 - Mid-Tex Gas Division Addition 080.59055 37602 34
080 190 - Mid-Tex Gas Division Addition 080.59060 37602 153
080 190 - Mid-Tex Gas Division Addition 080.59060 38000 38
080 190 - Mid-Tex Gas Division Addition 080.59062 37602 41,449
080 190 - Mid-Tex Gas Division Addition 080.59062 38000 4,622
080 190 - Mid-Tex Gas Division Addition 080.59064 37602 102
080 190 - Mid-Tex Gas Division Addition 080.59064 38000 31
080 190 - Mid-Tex Gas Division Addition 080.59068 37602 295
080 190 - Mid-Tex Gas Division Addition 080.59068 38000 126
080 190 - Mid-Tex Gas Division Addition 080.59069 37602 57
080 190 - Mid-Tex Gas Division Addition 080.59069 38000 50
080 190 - Mid-Tex Gas Division Addition 080.59070 37602 2
080 190 - Mid-Tex Gas Division Addition 080.59074 37602 20
080 190 - Mid-Tex Gas Division Addition 080.59074 38000 13
080 190 - Mid-Tex Gas Division Addition 080.59075 37602 29
080 190 - Mid-Tex Gas Division Addition 080.59075 38000 20
080 190 - Mid-Tex Gas Division Addition 080.59078 37602 104
080 190 - Mid-Tex Gas Division Addition 080.59090 37602 18
080 190 - Mid-Tex Gas Division Addition 080.59093 37602 2
080 190 - Mid-Tex Gas Division Addition 080.59100 37602 9
080 190 - Mid-Tex Gas Division Addition 080.59117 37602 299
080 190 - Mid-Tex Gas Division Addition 080.59117 38000 3
080 190 - Mid-Tex Gas Division Addition 080.59124 37602 2,165
080 190 - Mid-Tex Gas Division Addition 080.59132 38000 112
080 190 - Mid-Tex Gas Division Addition 080.59135 37601 10,074
080 190 - Mid-Tex Gas Division Addition 080.59140 37800 2
MTX Additions by FERC
Page 22 of 101
420
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.59142 37601 386,164
080 190 - Mid-Tex Gas Division Addition 080.59144 37602 7
080 190 - Mid-Tex Gas Division Addition 080.59153 37602 37
080 190 - Mid-Tex Gas Division Addition 080.59153 38000 11
080 190 - Mid-Tex Gas Division Addition 080.59157 37602 28
080 190 - Mid-Tex Gas Division Addition 080.59157 38000 20
080 190 - Mid-Tex Gas Division Addition 080.59162 38000 4
080 190 - Mid-Tex Gas Division Addition 080.59165 37601 322
080 190 - Mid-Tex Gas Division Addition 080.59167 37602 22
080 190 - Mid-Tex Gas Division Addition 080.59172 37602 23
080 190 - Mid-Tex Gas Division Addition 080.59172 38000 3
080 190 - Mid-Tex Gas Division Addition 080.59173 37602 26
080 190 - Mid-Tex Gas Division Addition 080.59173 38000 4
080 190 - Mid-Tex Gas Division Addition 080.59175 37602 28
080 190 - Mid-Tex Gas Division Addition 080.59175 38000 0
080 190 - Mid-Tex Gas Division Addition 080.59176 37602 19
080 190 - Mid-Tex Gas Division Addition 080.59199 38000 71
080 190 - Mid-Tex Gas Division Addition 080.59202 37602 68
080 190 - Mid-Tex Gas Division Addition 080.59202 38000 19
080 190 - Mid-Tex Gas Division Addition 080.59214 37602 91
080 190 - Mid-Tex Gas Division Addition 080.59214 38000 14
080 190 - Mid-Tex Gas Division Addition 080.59215 37602 4
080 190 - Mid-Tex Gas Division Addition 080.59216 37602 626
080 190 - Mid-Tex Gas Division Addition 080.59216 38000 86
080 190 - Mid-Tex Gas Division Addition 080.59221 37602 40
080 190 - Mid-Tex Gas Division Addition 080.59221 38000 10
080 190 - Mid-Tex Gas Division Addition 080.59261 37602 43
080 190 - Mid-Tex Gas Division Addition 080.59261 38000 16
080 190 - Mid-Tex Gas Division Addition 080.59268 37602 35
080 190 - Mid-Tex Gas Division Addition 080.59268 38000 10
080 190 - Mid-Tex Gas Division Addition 080.59269 37600 38
080 190 - Mid-Tex Gas Division Addition 080.59272 37602 125
080 190 - Mid-Tex Gas Division Addition 080.59272 38000 10
080 190 - Mid-Tex Gas Division Addition 080.59274 38000 2
080 190 - Mid-Tex Gas Division Addition 080.59277 37602 19
080 190 - Mid-Tex Gas Division Addition 080.59288 37602 132
080 190 - Mid-Tex Gas Division Addition 080.59288 38000 3
080 190 - Mid-Tex Gas Division Addition 080.59292 37602 49
080 190 - Mid-Tex Gas Division Addition 080.59292 38000 5
080 190 - Mid-Tex Gas Division Addition 080.59293 37602 136
080 190 - Mid-Tex Gas Division Addition 080.59307 37602 30
080 190 - Mid-Tex Gas Division Addition 080.59309 38000 135
080 190 - Mid-Tex Gas Division Addition 080.59330 37602 17,908
080 190 - Mid-Tex Gas Division Addition 080.59330 38000 1,990
080 190 - Mid-Tex Gas Division Addition 080.59331 37602 3,425
080 190 - Mid-Tex Gas Division Addition 080.59332 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.59335 37602 1
080 190 - Mid-Tex Gas Division Addition 080.59337 37602 21
080 190 - Mid-Tex Gas Division Addition 080.59337 38000 2
080 190 - Mid-Tex Gas Division Addition 080.59339 37602 92
080 190 - Mid-Tex Gas Division Addition 080.59339 38000 31
080 190 - Mid-Tex Gas Division Addition 080.59340 37602 42
080 190 - Mid-Tex Gas Division Addition 080.59340 38000 11
080 190 - Mid-Tex Gas Division Addition 080.59342 37602 112
080 190 - Mid-Tex Gas Division Addition 080.59342 38000 53
080 190 - Mid-Tex Gas Division Addition 080.59344 37602 103
080 190 - Mid-Tex Gas Division Addition 080.59345 37602 208
080 190 - Mid-Tex Gas Division Addition 080.59345 38000 166
080 190 - Mid-Tex Gas Division Addition 080.59346 37602 199
080 190 - Mid-Tex Gas Division Addition 080.59346 38000 133
080 190 - Mid-Tex Gas Division Addition 080.59347 37602 30
080 190 - Mid-Tex Gas Division Addition 080.59347 38000 15
080 190 - Mid-Tex Gas Division Addition 080.59348 37602 3,660
080 190 - Mid-Tex Gas Division Addition 080.59348 38000 2,340
080 190 - Mid-Tex Gas Division Addition 080.59350 37602 985
080 190 - Mid-Tex Gas Division Addition 080.59350 38000 362
080 190 - Mid-Tex Gas Division Addition 080.59360 37602 7
080 190 - Mid-Tex Gas Division Addition 080.59365 37602 42
080 190 - Mid-Tex Gas Division Addition 080.59365 38000 1
080 190 - Mid-Tex Gas Division Addition 080.59369 38000 77
080 190 - Mid-Tex Gas Division Addition 080.59372 37602 62
080 190 - Mid-Tex Gas Division Addition 080.59372 38000 7
080 190 - Mid-Tex Gas Division Addition 080.59377 37602 24
080 190 - Mid-Tex Gas Division Addition 080.59377 38000 2
080 190 - Mid-Tex Gas Division Addition 080.59378 37601 65
080 190 - Mid-Tex Gas Division Addition 080.59381 37602 17
080 190 - Mid-Tex Gas Division Addition 080.59381 38000 9
080 190 - Mid-Tex Gas Division Addition 080.59387 37602 4
080 190 - Mid-Tex Gas Division Addition 080.59387 38000 1
080 190 - Mid-Tex Gas Division Addition 080.59402 37602 46
080 190 - Mid-Tex Gas Division Addition 080.59402 38000 2
080 190 - Mid-Tex Gas Division Addition 080.59408 37602 27
080 190 - Mid-Tex Gas Division Addition 080.59408 38000 5
080 190 - Mid-Tex Gas Division Addition 080.59409 37602 38
080 190 - Mid-Tex Gas Division Addition 080.59409 38000 7
080 190 - Mid-Tex Gas Division Addition 080.59411 37602 1
080 190 - Mid-Tex Gas Division Addition 080.59411 38000 0
080 190 - Mid-Tex Gas Division Addition 080.59414 37602 47
080 190 - Mid-Tex Gas Division Addition 080.59414 38000 5
080 190 - Mid-Tex Gas Division Addition 080.59416 37602 75
080 190 - Mid-Tex Gas Division Addition 080.59416 38000 8
080 190 - Mid-Tex Gas Division Addition 080.59427 37602 45
080 190 - Mid-Tex Gas Division Addition 080.59427 38000 15
080 190 - Mid-Tex Gas Division Addition 080.59430 37800 7
080 190 - Mid-Tex Gas Division Addition 080.59432 37602 70
080 190 - Mid-Tex Gas Division Addition 080.59432 38000 16
080 190 - Mid-Tex Gas Division Addition 080.59445 37602 39
080 190 - Mid-Tex Gas Division Addition 080.59445 38000 2
080 190 - Mid-Tex Gas Division Addition 080.59454 37602 26
080 190 - Mid-Tex Gas Division Addition 080.59454 38000 11
080 190 - Mid-Tex Gas Division Addition 080.59463 37602 37
080 190 - Mid-Tex Gas Division Addition 080.59463 38000 9
080 190 - Mid-Tex Gas Division Addition 080.59468 37602 47
080 190 - Mid-Tex Gas Division Addition 080.59468 38000 20
080 190 - Mid-Tex Gas Division Addition 080.59469 37602 52
080 190 - Mid-Tex Gas Division Addition 080.59469 38000 35
080 190 - Mid-Tex Gas Division Addition 080.59470 37602 194
MTX Additions by FERC
Page 23 of 101
421
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.59470 38000 83
080 190 - Mid-Tex Gas Division Addition 080.59473 37800 0
080 190 - Mid-Tex Gas Division Addition 080.59477 37602 9
080 190 - Mid-Tex Gas Division Addition 080.59477 38000 1
080 190 - Mid-Tex Gas Division Addition 080.59482 37602 8
080 190 - Mid-Tex Gas Division Addition 080.59482 38000 0
080 190 - Mid-Tex Gas Division Addition 080.59488 37602 5
080 190 - Mid-Tex Gas Division Addition 080.59488 38000 2
080 190 - Mid-Tex Gas Division Addition 080.59496 37602 356
080 190 - Mid-Tex Gas Division Addition 080.59496 38000 89
080 190 - Mid-Tex Gas Division Addition 080.59497 37602 21
080 190 - Mid-Tex Gas Division Addition 080.59497 38000 2
080 190 - Mid-Tex Gas Division Addition 080.59530 37602 154
080 190 - Mid-Tex Gas Division Addition 080.59530 38000 126
080 190 - Mid-Tex Gas Division Addition 080.59533 37602 (243)
080 190 - Mid-Tex Gas Division Addition 080.59533 38000 (109)
080 190 - Mid-Tex Gas Division Addition 080.59534 37602 21
080 190 - Mid-Tex Gas Division Addition 080.59534 38000 9
080 190 - Mid-Tex Gas Division Addition 080.59535 37602 9
080 190 - Mid-Tex Gas Division Addition 080.59535 38000 10
080 190 - Mid-Tex Gas Division Addition 080.59539 37602 45
080 190 - Mid-Tex Gas Division Addition 080.59539 38000 15
080 190 - Mid-Tex Gas Division Addition 080.59541 37602 62
080 190 - Mid-Tex Gas Division Addition 080.59541 38000 3
080 190 - Mid-Tex Gas Division Addition 080.59546 37601 102
080 190 - Mid-Tex Gas Division Addition 080.59546 38000 5
080 190 - Mid-Tex Gas Division Addition 080.59548 37602 12
080 190 - Mid-Tex Gas Division Addition 080.59548 38000 2
080 190 - Mid-Tex Gas Division Addition 080.59553 37602 56
080 190 - Mid-Tex Gas Division Addition 080.59553 38000 6
080 190 - Mid-Tex Gas Division Addition 080.59559 37602 70
080 190 - Mid-Tex Gas Division Addition 080.59559 38000 8
080 190 - Mid-Tex Gas Division Addition 080.59580 37602 40
080 190 - Mid-Tex Gas Division Addition 080.59580 38000 7
080 190 - Mid-Tex Gas Division Addition 080.59590 37602 32
080 190 - Mid-Tex Gas Division Addition 080.59590 38000 4
080 190 - Mid-Tex Gas Division Addition 080.59600 37602 47
080 190 - Mid-Tex Gas Division Addition 080.59600 38000 8
080 190 - Mid-Tex Gas Division Addition 080.59601 37602 152
080 190 - Mid-Tex Gas Division Addition 080.59601 38000 17
080 190 - Mid-Tex Gas Division Addition 080.59603 37602 188
080 190 - Mid-Tex Gas Division Addition 080.59603 38000 90
080 190 - Mid-Tex Gas Division Addition 080.59606 37602 13
080 190 - Mid-Tex Gas Division Addition 080.59611 37800 28
080 190 - Mid-Tex Gas Division Addition 080.59612 37602 209
080 190 - Mid-Tex Gas Division Addition 080.59612 38000 21
080 190 - Mid-Tex Gas Division Addition 080.59620 37602 (147)
080 190 - Mid-Tex Gas Division Addition 080.59620 38000 (8)
080 190 - Mid-Tex Gas Division Addition 080.59625 37602 319
080 190 - Mid-Tex Gas Division Addition 080.59625 38000 7
080 190 - Mid-Tex Gas Division Addition 080.59627 37602 6,492
080 190 - Mid-Tex Gas Division Addition 080.59637 37602 214
080 190 - Mid-Tex Gas Division Addition 080.59637 38000 71
080 190 - Mid-Tex Gas Division Addition 080.59639 37602 67
080 190 - Mid-Tex Gas Division Addition 080.59639 38000 21
080 190 - Mid-Tex Gas Division Addition 080.59640 37602 418
080 190 - Mid-Tex Gas Division Addition 080.59640 38000 197
080 190 - Mid-Tex Gas Division Addition 080.59642 37602 8
080 190 - Mid-Tex Gas Division Addition 080.59643 37602 71
080 190 - Mid-Tex Gas Division Addition 080.59643 38000 24
080 190 - Mid-Tex Gas Division Addition 080.59644 37602 33
080 190 - Mid-Tex Gas Division Addition 080.59644 38000 5
080 190 - Mid-Tex Gas Division Addition 080.59645 37602 12
080 190 - Mid-Tex Gas Division Addition 080.59649 37602 102,853
080 190 - Mid-Tex Gas Division Addition 080.59649 38000 5,404
080 190 - Mid-Tex Gas Division Addition 080.59660 37602 (184)
080 190 - Mid-Tex Gas Division Addition 080.59660 38000 (65)
080 190 - Mid-Tex Gas Division Addition 080.59666 37602 61
080 190 - Mid-Tex Gas Division Addition 080.59666 38000 7
080 190 - Mid-Tex Gas Division Addition 080.59672 37602 7
080 190 - Mid-Tex Gas Division Addition 080.59672 38000 0
080 190 - Mid-Tex Gas Division Addition 080.59675 37602 49
080 190 - Mid-Tex Gas Division Addition 080.59675 38000 3
080 190 - Mid-Tex Gas Division Addition 080.59678 37602 2,338
080 190 - Mid-Tex Gas Division Addition 080.59678 38000 585
080 190 - Mid-Tex Gas Division Addition 080.59679 37602 8
080 190 - Mid-Tex Gas Division Addition 080.59679 38000 0
080 190 - Mid-Tex Gas Division Addition 080.59681 37602 68
080 190 - Mid-Tex Gas Division Addition 080.59683 38000 7
080 190 - Mid-Tex Gas Division Addition 080.59688 37602 280
080 190 - Mid-Tex Gas Division Addition 080.59688 38000 97
080 190 - Mid-Tex Gas Division Addition 080.59691 37602 20
080 190 - Mid-Tex Gas Division Addition 080.59697 37602 31
080 190 - Mid-Tex Gas Division Addition 080.59697 38000 1
080 190 - Mid-Tex Gas Division Addition 080.59700 38000 35
080 190 - Mid-Tex Gas Division Addition 080.59702 37602 185
080 190 - Mid-Tex Gas Division Addition 080.59702 38000 46
080 190 - Mid-Tex Gas Division Addition 080.59705 37602 7
080 190 - Mid-Tex Gas Division Addition 080.59713 37900 4
080 190 - Mid-Tex Gas Division Addition 080.59724 37602 515
080 190 - Mid-Tex Gas Division Addition 080.59726 37602 73
080 190 - Mid-Tex Gas Division Addition 080.59726 38000 5
080 190 - Mid-Tex Gas Division Addition 080.59728 37602 11
080 190 - Mid-Tex Gas Division Addition 080.59729 37602 59
080 190 - Mid-Tex Gas Division Addition 080.59729 38000 10
080 190 - Mid-Tex Gas Division Addition 080.59733 37602 7
080 190 - Mid-Tex Gas Division Addition 080.59738 37602 40
080 190 - Mid-Tex Gas Division Addition 080.59741 37602 43
080 190 - Mid-Tex Gas Division Addition 080.59741 38000 15
080 190 - Mid-Tex Gas Division Addition 080.59745 37602 241
080 190 - Mid-Tex Gas Division Addition 080.59745 38000 68
080 190 - Mid-Tex Gas Division Addition 080.59746 37602 3,864
080 190 - Mid-Tex Gas Division Addition 080.59746 38000 2,081
080 190 - Mid-Tex Gas Division Addition 080.59747 37602 428
080 190 - Mid-Tex Gas Division Addition 080.59747 38000 241
080 190 - Mid-Tex Gas Division Addition 080.59753 37602 64
080 190 - Mid-Tex Gas Division Addition 080.59753 38000 20
MTX Additions by FERC
Page 24 of 101
422
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.59775 37602 307
080 190 - Mid-Tex Gas Division Addition 080.59775 38000 14
080 190 - Mid-Tex Gas Division Addition 080.59784 37900 263
080 190 - Mid-Tex Gas Division Addition 080.59818 38000 4
080 190 - Mid-Tex Gas Division Addition 080.59823 37800 17
080 190 - Mid-Tex Gas Division Addition 080.59824 37602 34
080 190 - Mid-Tex Gas Division Addition 080.59824 38000 11
080 190 - Mid-Tex Gas Division Addition 080.59825 37602 39
080 190 - Mid-Tex Gas Division Addition 080.59825 38000 17
080 190 - Mid-Tex Gas Division Addition 080.59827 37602 89
080 190 - Mid-Tex Gas Division Addition 080.59830 37602 191
080 190 - Mid-Tex Gas Division Addition 080.59830 38000 82
080 190 - Mid-Tex Gas Division Addition 080.59836 37602 6
080 190 - Mid-Tex Gas Division Addition 080.59836 38000 1
080 190 - Mid-Tex Gas Division Addition 080.59845 37602 75
080 190 - Mid-Tex Gas Division Addition 080.59845 38000 17
080 190 - Mid-Tex Gas Division Addition 080.59854 37602 57
080 190 - Mid-Tex Gas Division Addition 080.59854 38000 10
080 190 - Mid-Tex Gas Division Addition 080.59857 37600 1
080 190 - Mid-Tex Gas Division Addition 080.59879 37602 130
080 190 - Mid-Tex Gas Division Addition 080.59879 38000 106
080 190 - Mid-Tex Gas Division Addition 080.59881 37602 21
080 190 - Mid-Tex Gas Division Addition 080.59881 38000 4
080 190 - Mid-Tex Gas Division Addition 080.59882 37602 105
080 190 - Mid-Tex Gas Division Addition 080.59882 38000 12
080 190 - Mid-Tex Gas Division Addition 080.59886 37602 3,531
080 190 - Mid-Tex Gas Division Addition 080.59886 38000 225
080 190 - Mid-Tex Gas Division Addition 080.59889 37602 1,876
080 190 - Mid-Tex Gas Division Addition 080.59889 38000 385
080 190 - Mid-Tex Gas Division Addition 080.59889 38100 (41)
080 190 - Mid-Tex Gas Division Addition 080.59889 38200 (2)
080 190 - Mid-Tex Gas Division Addition 080.59889 38300 (9)
080 190 - Mid-Tex Gas Division Addition 080.59893 37602 319
080 190 - Mid-Tex Gas Division Addition 080.59893 38000 32
080 190 - Mid-Tex Gas Division Addition 080.59894 37602 10
080 190 - Mid-Tex Gas Division Addition 080.59905 37602 664
080 190 - Mid-Tex Gas Division Addition 080.59905 38000 35
080 190 - Mid-Tex Gas Division Addition 080.59907 37602 33
080 190 - Mid-Tex Gas Division Addition 080.59907 38000 11
080 190 - Mid-Tex Gas Division Addition 080.59909 37602 21
080 190 - Mid-Tex Gas Division Addition 080.59912 37602 13
080 190 - Mid-Tex Gas Division Addition 080.59939 37602 (416)
080 190 - Mid-Tex Gas Division Addition 080.59939 38000 (64)
080 190 - Mid-Tex Gas Division Addition 080.59943 37601 44,317
080 190 - Mid-Tex Gas Division Addition 080.59943 37602 3,545
080 190 - Mid-Tex Gas Division Addition 080.59943 37800 33,565
080 190 - Mid-Tex Gas Division Addition 080.59946 37602 127
080 190 - Mid-Tex Gas Division Addition 080.59946 38000 14
080 190 - Mid-Tex Gas Division Addition 080.59947 37602 85
080 190 - Mid-Tex Gas Division Addition 080.59947 38000 21
080 190 - Mid-Tex Gas Division Addition 080.59948 37602 93
080 190 - Mid-Tex Gas Division Addition 080.59948 38000 12
080 190 - Mid-Tex Gas Division Addition 080.59956 37602 9
080 190 - Mid-Tex Gas Division Addition 080.59970 37602 15
080 190 - Mid-Tex Gas Division Addition 080.59971 37602 568
080 190 - Mid-Tex Gas Division Addition 080.59971 38000 30
080 190 - Mid-Tex Gas Division Addition 080.59994 37602 5
080 190 - Mid-Tex Gas Division Addition 080.59994 38000 1
080 190 - Mid-Tex Gas Division Addition 080.60006 37602 3
080 190 - Mid-Tex Gas Division Addition 080.60022 37602 19
080 190 - Mid-Tex Gas Division Addition 080.60022 38000 2
080 190 - Mid-Tex Gas Division Addition 080.60047 37602 189
080 190 - Mid-Tex Gas Division Addition 080.60047 38000 4
080 190 - Mid-Tex Gas Division Addition 080.60048 37602 109
080 190 - Mid-Tex Gas Division Addition 080.60048 38000 59
080 190 - Mid-Tex Gas Division Addition 080.60050 37602 240
080 190 - Mid-Tex Gas Division Addition 080.60050 38000 7
080 190 - Mid-Tex Gas Division Addition 080.60063 37602 60
080 190 - Mid-Tex Gas Division Addition 080.60063 38000 4
080 190 - Mid-Tex Gas Division Addition 080.60077 37602 36
080 190 - Mid-Tex Gas Division Addition 080.60077 38000 9
080 190 - Mid-Tex Gas Division Addition 080.60079 37602 47
080 190 - Mid-Tex Gas Division Addition 080.60079 38000 13
080 190 - Mid-Tex Gas Division Addition 080.60080 37601 437,233
080 190 - Mid-Tex Gas Division Addition 080.60080 37602 2,855
080 190 - Mid-Tex Gas Division Addition 080.60080 37800 6,068
080 190 - Mid-Tex Gas Division Addition 080.60083 37600 1
080 190 - Mid-Tex Gas Division Addition 080.60087 37602 42
080 190 - Mid-Tex Gas Division Addition 080.60087 38000 28
080 190 - Mid-Tex Gas Division Addition 080.60088 37602 8
080 190 - Mid-Tex Gas Division Addition 080.60091 37602 98
080 190 - Mid-Tex Gas Division Addition 080.60091 38000 24
080 190 - Mid-Tex Gas Division Addition 080.60094 37602 696
080 190 - Mid-Tex Gas Division Addition 080.60094 38000 113
080 190 - Mid-Tex Gas Division Addition 080.60100 37602 163
080 190 - Mid-Tex Gas Division Addition 080.60100 38000 9
080 190 - Mid-Tex Gas Division Addition 080.60103 37602 292
080 190 - Mid-Tex Gas Division Addition 080.60103 38000 12
080 190 - Mid-Tex Gas Division Addition 080.60104 37602 181
080 190 - Mid-Tex Gas Division Addition 080.60104 38000 77
080 190 - Mid-Tex Gas Division Addition 080.60105 37602 2,864
080 190 - Mid-Tex Gas Division Addition 080.60105 38000 716
080 190 - Mid-Tex Gas Division Addition 080.60106 37602 131
080 190 - Mid-Tex Gas Division Addition 080.60106 38000 1
080 190 - Mid-Tex Gas Division Addition 080.60107 37602 99
080 190 - Mid-Tex Gas Division Addition 080.60107 38000 3
080 190 - Mid-Tex Gas Division Addition 080.60108 37602 198
080 190 - Mid-Tex Gas Division Addition 080.60108 38000 6
080 190 - Mid-Tex Gas Division Addition 080.60110 37602 166
080 190 - Mid-Tex Gas Division Addition 080.60110 38000 3
080 190 - Mid-Tex Gas Division Addition 080.60111 37602 29,208
080 190 - Mid-Tex Gas Division Addition 080.60111 38000 3,245
080 190 - Mid-Tex Gas Division Addition 080.60112 37602 (1,804)
080 190 - Mid-Tex Gas Division Addition 080.60112 38000 (601)
080 190 - Mid-Tex Gas Division Addition 080.60113 37602 7,162
080 190 - Mid-Tex Gas Division Addition 080.60113 38000 1,790
080 190 - Mid-Tex Gas Division Addition 080.60114 37602 16,598
MTX Additions by FERC
Page 25 of 101
423
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.60117 37602 58
080 190 - Mid-Tex Gas Division Addition 080.60117 38000 25
080 190 - Mid-Tex Gas Division Addition 080.60125 37800 85
080 190 - Mid-Tex Gas Division Addition 080.60126 37800 266
080 190 - Mid-Tex Gas Division Addition 080.60142 37602 24
080 190 - Mid-Tex Gas Division Addition 080.60143 37602 29
080 190 - Mid-Tex Gas Division Addition 080.60143 38000 2
080 190 - Mid-Tex Gas Division Addition 080.60145 37601 42,860
080 190 - Mid-Tex Gas Division Addition 080.60145 37800 3,785
080 190 - Mid-Tex Gas Division Addition 080.60146 37602 92
080 190 - Mid-Tex Gas Division Addition 080.60146 38000 5
080 190 - Mid-Tex Gas Division Addition 080.60150 37602 17
080 190 - Mid-Tex Gas Division Addition 080.60150 38000 5
080 190 - Mid-Tex Gas Division Addition 080.60157 37602 23
080 190 - Mid-Tex Gas Division Addition 080.60157 38000 1
080 190 - Mid-Tex Gas Division Addition 080.60158 37602 41
080 190 - Mid-Tex Gas Division Addition 080.60163 37602 42
080 190 - Mid-Tex Gas Division Addition 080.60163 38000 2
080 190 - Mid-Tex Gas Division Addition 080.60167 37602 83
080 190 - Mid-Tex Gas Division Addition 080.60167 38000 21
080 190 - Mid-Tex Gas Division Addition 080.60170 37602 8
080 190 - Mid-Tex Gas Division Addition 080.60170 37800 7
080 190 - Mid-Tex Gas Division Addition 080.60170 38000 1
080 190 - Mid-Tex Gas Division Addition 080.60171 37602 47
080 190 - Mid-Tex Gas Division Addition 080.60171 38000 12
080 190 - Mid-Tex Gas Division Addition 080.60172 37602 40
080 190 - Mid-Tex Gas Division Addition 080.60172 38000 13
080 190 - Mid-Tex Gas Division Addition 080.60173 37602 26
080 190 - Mid-Tex Gas Division Addition 080.60173 38000 1
080 190 - Mid-Tex Gas Division Addition 080.60178 37602 3
080 190 - Mid-Tex Gas Division Addition 080.60178 38000 3
080 190 - Mid-Tex Gas Division Addition 080.60182 37900 460
080 190 - Mid-Tex Gas Division Addition 080.60188 37602 24
080 190 - Mid-Tex Gas Division Addition 080.60191 37602 30
080 190 - Mid-Tex Gas Division Addition 080.60191 38000 1
080 190 - Mid-Tex Gas Division Addition 080.60200 37602 483
080 190 - Mid-Tex Gas Division Addition 080.60200 38000 10
080 190 - Mid-Tex Gas Division Addition 080.60201 37602 245
080 190 - Mid-Tex Gas Division Addition 080.60201 38000 27
080 190 - Mid-Tex Gas Division Addition 080.60202 37602 363
080 190 - Mid-Tex Gas Division Addition 080.60202 38000 15
080 190 - Mid-Tex Gas Division Addition 080.60204 37602 245
080 190 - Mid-Tex Gas Division Addition 080.60204 38000 8
080 190 - Mid-Tex Gas Division Addition 080.60217 37602 8
080 190 - Mid-Tex Gas Division Addition 080.60225 37602 50
080 190 - Mid-Tex Gas Division Addition 080.60248 37601 34
080 190 - Mid-Tex Gas Division Addition 080.60250 37602 70
080 190 - Mid-Tex Gas Division Addition 080.60250 38000 4
080 190 - Mid-Tex Gas Division Addition 080.60254 37602 148
080 190 - Mid-Tex Gas Division Addition 080.60254 38000 26
080 190 - Mid-Tex Gas Division Addition 080.60259 37602 31
080 190 - Mid-Tex Gas Division Addition 080.60279 37602 11
080 190 - Mid-Tex Gas Division Addition 080.60285 37602 59
080 190 - Mid-Tex Gas Division Addition 080.60285 38000 15
080 190 - Mid-Tex Gas Division Addition 080.60287 37602 68
080 190 - Mid-Tex Gas Division Addition 080.60287 38000 8
080 190 - Mid-Tex Gas Division Addition 080.60288 37602 15
080 190 - Mid-Tex Gas Division Addition 080.60294 37602 67
080 190 - Mid-Tex Gas Division Addition 080.60295 37601 34
080 190 - Mid-Tex Gas Division Addition 080.60299 37601 39
080 190 - Mid-Tex Gas Division Addition 080.60302 37800 2
080 190 - Mid-Tex Gas Division Addition 080.60317 37602 8,256
080 190 - Mid-Tex Gas Division Addition 080.60328 37602 18
080 190 - Mid-Tex Gas Division Addition 080.60337 37602 12,925
080 190 - Mid-Tex Gas Division Addition 080.60345 37602 14
080 190 - Mid-Tex Gas Division Addition 080.60359 37602 (19)
080 190 - Mid-Tex Gas Division Addition 080.60361 38000 732
080 190 - Mid-Tex Gas Division Addition 080.60364 37602 36
080 190 - Mid-Tex Gas Division Addition 080.60364 38000 6
080 190 - Mid-Tex Gas Division Addition 080.60379 37800 2
080 190 - Mid-Tex Gas Division Addition 080.60381 37602 25
080 190 - Mid-Tex Gas Division Addition 080.60381 38000 7
080 190 - Mid-Tex Gas Division Addition 080.60382 37800 2
080 190 - Mid-Tex Gas Division Addition 080.60383 37800 3
080 190 - Mid-Tex Gas Division Addition 080.60390 37602 2,795
080 190 - Mid-Tex Gas Division Addition 080.60390 38000 698
080 190 - Mid-Tex Gas Division Addition 080.60391 37602 1,668
080 190 - Mid-Tex Gas Division Addition 080.60391 38000 417
080 190 - Mid-Tex Gas Division Addition 080.60396 37601 142
080 190 - Mid-Tex Gas Division Addition 080.60397 37602 59
080 190 - Mid-Tex Gas Division Addition 080.60397 38000 23
080 190 - Mid-Tex Gas Division Addition 080.60399 37601 12
080 190 - Mid-Tex Gas Division Addition 080.60399 37602 688
080 190 - Mid-Tex Gas Division Addition 080.60399 38000 37
080 190 - Mid-Tex Gas Division Addition 080.60402 37602 1
080 190 - Mid-Tex Gas Division Addition 080.60413 37602 39
080 190 - Mid-Tex Gas Division Addition 080.60413 38000 2
080 190 - Mid-Tex Gas Division Addition 080.60419 37602 359
080 190 - Mid-Tex Gas Division Addition 080.60419 38000 19
080 190 - Mid-Tex Gas Division Addition 080.60430 37602 11
080 190 - Mid-Tex Gas Division Addition 080.60439 37602 86
080 190 - Mid-Tex Gas Division Addition 080.60439 38000 1
080 190 - Mid-Tex Gas Division Addition 080.60441 37602 67
080 190 - Mid-Tex Gas Division Addition 080.60441 38000 3
080 190 - Mid-Tex Gas Division Addition 080.60442 37602 23
080 190 - Mid-Tex Gas Division Addition 080.60442 38000 2
080 190 - Mid-Tex Gas Division Addition 080.60446 37602 470
080 190 - Mid-Tex Gas Division Addition 080.60446 38000 148
080 190 - Mid-Tex Gas Division Addition 080.60447 37602 1,339,248
080 190 - Mid-Tex Gas Division Addition 080.60447 38000 70,487
080 190 - Mid-Tex Gas Division Addition 080.60449 37602 93
080 190 - Mid-Tex Gas Division Addition 080.60449 38000 2
080 190 - Mid-Tex Gas Division Addition 080.60452 37602 63
080 190 - Mid-Tex Gas Division Addition 080.60452 38000 3
080 190 - Mid-Tex Gas Division Addition 080.60454 37602 15
080 190 - Mid-Tex Gas Division Addition 080.60454 38000 1
080 190 - Mid-Tex Gas Division Addition 080.60455 37602 89
MTX Additions by FERC
Page 26 of 101
424
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.60455 38000 8
080 190 - Mid-Tex Gas Division Addition 080.60473 37601 49
080 190 - Mid-Tex Gas Division Addition 080.60474 37602 13
080 190 - Mid-Tex Gas Division Addition 080.60478 37602 642
080 190 - Mid-Tex Gas Division Addition 080.60478 38000 113
080 190 - Mid-Tex Gas Division Addition 080.60486 37602 82
080 190 - Mid-Tex Gas Division Addition 080.60486 38000 0
080 190 - Mid-Tex Gas Division Addition 080.60495 37602 19
080 190 - Mid-Tex Gas Division Addition 080.60497 37602 77,145
080 190 - Mid-Tex Gas Division Addition 080.60507 37602 126
080 190 - Mid-Tex Gas Division Addition 080.60507 38000 0
080 190 - Mid-Tex Gas Division Addition 080.60516 37602 31
080 190 - Mid-Tex Gas Division Addition 080.60516 38000 2
080 190 - Mid-Tex Gas Division Addition 080.60517 37601 8
080 190 - Mid-Tex Gas Division Addition 080.60517 37800 68
080 190 - Mid-Tex Gas Division Addition 080.60518 37602 21
080 190 - Mid-Tex Gas Division Addition 080.60542 37602 5
080 190 - Mid-Tex Gas Division Addition 080.60546 37602 1,503
080 190 - Mid-Tex Gas Division Addition 080.60546 38000 63
080 190 - Mid-Tex Gas Division Addition 080.60547 37602 2
080 190 - Mid-Tex Gas Division Addition 080.60548 37602 338
080 190 - Mid-Tex Gas Division Addition 080.60548 38000 38
080 190 - Mid-Tex Gas Division Addition 080.60559 37602 43
080 190 - Mid-Tex Gas Division Addition 080.60559 38000 24
080 190 - Mid-Tex Gas Division Addition 080.60560 37602 34
080 190 - Mid-Tex Gas Division Addition 080.60561 37602 16
080 190 - Mid-Tex Gas Division Addition 080.60561 38000 11
080 190 - Mid-Tex Gas Division Addition 080.60572 37602 3
080 190 - Mid-Tex Gas Division Addition 080.60580 37601 643
080 190 - Mid-Tex Gas Division Addition 080.60584 37602 121
080 190 - Mid-Tex Gas Division Addition 080.60584 38000 3
080 190 - Mid-Tex Gas Division Addition 080.60585 37602 91
080 190 - Mid-Tex Gas Division Addition 080.60585 38000 19
080 190 - Mid-Tex Gas Division Addition 080.60586 37602 2,959
080 190 - Mid-Tex Gas Division Addition 080.60586 38000 1,268
080 190 - Mid-Tex Gas Division Addition 080.60596 38000 271
080 190 - Mid-Tex Gas Division Addition 080.60598 38000 98
080 190 - Mid-Tex Gas Division Addition 080.60599 38000 112
080 190 - Mid-Tex Gas Division Addition 080.60604 37602 14
080 190 - Mid-Tex Gas Division Addition 080.60604 38000 1
080 190 - Mid-Tex Gas Division Addition 080.60608 37602 17
080 190 - Mid-Tex Gas Division Addition 080.60611 37602 84
080 190 - Mid-Tex Gas Division Addition 080.60611 38000 53
080 190 - Mid-Tex Gas Division Addition 080.60615 37602 4,043
080 190 - Mid-Tex Gas Division Addition 080.60615 38000 449
080 190 - Mid-Tex Gas Division Addition 080.60616 37602 40
080 190 - Mid-Tex Gas Division Addition 080.60616 38000 1
080 190 - Mid-Tex Gas Division Addition 080.60619 37602 29
080 190 - Mid-Tex Gas Division Addition 080.60619 38000 7
080 190 - Mid-Tex Gas Division Addition 080.60628 37602 141
080 190 - Mid-Tex Gas Division Addition 080.60629 37602 7
080 190 - Mid-Tex Gas Division Addition 080.60629 38000 3
080 190 - Mid-Tex Gas Division Addition 080.60634 37602 18
080 190 - Mid-Tex Gas Division Addition 080.60636 37602 30
080 190 - Mid-Tex Gas Division Addition 080.60644 37800 2
080 190 - Mid-Tex Gas Division Addition 080.60646 37602 15
080 190 - Mid-Tex Gas Division Addition 080.60646 38000 2
080 190 - Mid-Tex Gas Division Addition 080.60655 37602 895
080 190 - Mid-Tex Gas Division Addition 080.60655 38000 47
080 190 - Mid-Tex Gas Division Addition 080.60661 37602 220
080 190 - Mid-Tex Gas Division Addition 080.60661 38000 55
080 190 - Mid-Tex Gas Division Addition 080.60662 37602 4,097
080 190 - Mid-Tex Gas Division Addition 080.60662 38000 723
080 190 - Mid-Tex Gas Division Addition 080.60663 37602 16
080 190 - Mid-Tex Gas Division Addition 080.60664 37602 30
080 190 - Mid-Tex Gas Division Addition 080.60664 38000 20
080 190 - Mid-Tex Gas Division Addition 080.60670 37601 738,066
080 190 - Mid-Tex Gas Division Addition 080.60670 37602 68,657
080 190 - Mid-Tex Gas Division Addition 080.60670 37800 17,165
080 190 - Mid-Tex Gas Division Addition 080.60679 37602 61
080 190 - Mid-Tex Gas Division Addition 080.60681 37602 24
080 190 - Mid-Tex Gas Division Addition 080.60681 38000 12
080 190 - Mid-Tex Gas Division Addition 080.60683 37602 56
080 190 - Mid-Tex Gas Division Addition 080.60683 38000 17
080 190 - Mid-Tex Gas Division Addition 080.60684 37602 37
080 190 - Mid-Tex Gas Division Addition 080.60685 37602 12
080 190 - Mid-Tex Gas Division Addition 080.60685 38000 3
080 190 - Mid-Tex Gas Division Addition 080.60688 37602 33
080 190 - Mid-Tex Gas Division Addition 080.60688 38000 6
080 190 - Mid-Tex Gas Division Addition 080.60691 37602 17,692
080 190 - Mid-Tex Gas Division Addition 080.60691 38000 931
080 190 - Mid-Tex Gas Division Addition 080.60693 37602 7,924
080 190 - Mid-Tex Gas Division Addition 080.60693 38000 163
080 190 - Mid-Tex Gas Division Addition 080.60694 37602 728
080 190 - Mid-Tex Gas Division Addition 080.60694 38000 505
080 190 - Mid-Tex Gas Division Addition 080.60699 37602 8
080 190 - Mid-Tex Gas Division Addition 080.60704 37602 54
080 190 - Mid-Tex Gas Division Addition 080.60704 38000 18
080 190 - Mid-Tex Gas Division Addition 080.60705 37602 51
080 190 - Mid-Tex Gas Division Addition 080.60706 37602 815
080 190 - Mid-Tex Gas Division Addition 080.60706 38000 65
080 190 - Mid-Tex Gas Division Addition 080.60707 37602 117
080 190 - Mid-Tex Gas Division Addition 080.60707 38000 5
080 190 - Mid-Tex Gas Division Addition 080.60714 37602 98
080 190 - Mid-Tex Gas Division Addition 080.60718 37602 74
080 190 - Mid-Tex Gas Division Addition 080.60718 38000 50
080 190 - Mid-Tex Gas Division Addition 080.60719 37602 335
080 190 - Mid-Tex Gas Division Addition 080.60719 38000 112
080 190 - Mid-Tex Gas Division Addition 080.60720 37602 123
080 190 - Mid-Tex Gas Division Addition 080.60721 37602 101
080 190 - Mid-Tex Gas Division Addition 080.60722 37602 75
080 190 - Mid-Tex Gas Division Addition 080.60722 38000 52
080 190 - Mid-Tex Gas Division Addition 080.60723 37602 17
080 190 - Mid-Tex Gas Division Addition 080.60723 38000 8
080 190 - Mid-Tex Gas Division Addition 080.60724 37602 243
080 190 - Mid-Tex Gas Division Addition 080.60724 38000 27
080 190 - Mid-Tex Gas Division Addition 080.60725 37602 48
MTX Additions by FERC
Page 27 of 101
425
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.60725 38000 15
080 190 - Mid-Tex Gas Division Addition 080.60727 37602 153
080 190 - Mid-Tex Gas Division Addition 080.60727 38000 188
080 190 - Mid-Tex Gas Division Addition 080.60728 37602 178
080 190 - Mid-Tex Gas Division Addition 080.60728 38000 119
080 190 - Mid-Tex Gas Division Addition 080.60729 37602 312
080 190 - Mid-Tex Gas Division Addition 080.60730 37602 32
080 190 - Mid-Tex Gas Division Addition 080.60730 38000 17
080 190 - Mid-Tex Gas Division Addition 080.60732 37602 2,286
080 190 - Mid-Tex Gas Division Addition 080.60732 38000 889
080 190 - Mid-Tex Gas Division Addition 080.60733 37602 25
080 190 - Mid-Tex Gas Division Addition 080.60733 38000 4
080 190 - Mid-Tex Gas Division Addition 080.60734 37602 70
080 190 - Mid-Tex Gas Division Addition 080.60734 38000 70
080 190 - Mid-Tex Gas Division Addition 080.60735 37602 344
080 190 - Mid-Tex Gas Division Addition 080.60735 38000 91
080 190 - Mid-Tex Gas Division Addition 080.60736 37602 5,175
080 190 - Mid-Tex Gas Division Addition 080.60736 38000 2,114
080 190 - Mid-Tex Gas Division Addition 080.60737 37602 172
080 190 - Mid-Tex Gas Division Addition 080.60737 38000 19
080 190 - Mid-Tex Gas Division Addition 080.60738 37602 16
080 190 - Mid-Tex Gas Division Addition 080.60738 38000 10
080 190 - Mid-Tex Gas Division Addition 080.60740 37602 46
080 190 - Mid-Tex Gas Division Addition 080.60740 38000 11
080 190 - Mid-Tex Gas Division Addition 080.60741 37602 55
080 190 - Mid-Tex Gas Division Addition 080.60741 38000 1
080 190 - Mid-Tex Gas Division Addition 080.60743 37602 206
080 190 - Mid-Tex Gas Division Addition 080.60743 38000 47
080 190 - Mid-Tex Gas Division Addition 080.60744 37602 60
080 190 - Mid-Tex Gas Division Addition 080.60744 38000 3
080 190 - Mid-Tex Gas Division Addition 080.60745 37602 41
080 190 - Mid-Tex Gas Division Addition 080.60745 38000 6
080 190 - Mid-Tex Gas Division Addition 080.60747 37602 938
080 190 - Mid-Tex Gas Division Addition 080.60747 38000 402
080 190 - Mid-Tex Gas Division Addition 080.60750 37602 29
080 190 - Mid-Tex Gas Division Addition 080.60754 37601 95,557
080 190 - Mid-Tex Gas Division Addition 080.60754 37602 23,897
080 190 - Mid-Tex Gas Division Addition 080.60760 37602 24
080 190 - Mid-Tex Gas Division Addition 080.60760 38000 1
080 190 - Mid-Tex Gas Division Addition 080.60763 37602 309
080 190 - Mid-Tex Gas Division Addition 080.60769 37602 42,727
080 190 - Mid-Tex Gas Division Addition 080.60769 38000 6,957
080 190 - Mid-Tex Gas Division Addition 080.60770 37602 3
080 190 - Mid-Tex Gas Division Addition 080.60770 38000 1
080 190 - Mid-Tex Gas Division Addition 080.60781 37602 22
080 190 - Mid-Tex Gas Division Addition 080.60781 38000 5
080 190 - Mid-Tex Gas Division Addition 080.60797 37602 619
080 190 - Mid-Tex Gas Division Addition 080.60797 38000 413
080 190 - Mid-Tex Gas Division Addition 080.60806 37602 30
080 190 - Mid-Tex Gas Division Addition 080.60808 37602 13,754
080 190 - Mid-Tex Gas Division Addition 080.60808 38000 1,528
080 190 - Mid-Tex Gas Division Addition 080.60809 37602 28
080 190 - Mid-Tex Gas Division Addition 080.60809 38000 12
080 190 - Mid-Tex Gas Division Addition 080.60817 37602 5
080 190 - Mid-Tex Gas Division Addition 080.60822 37602 37
080 190 - Mid-Tex Gas Division Addition 080.60822 38000 8
080 190 - Mid-Tex Gas Division Addition 080.60823 37602 170
080 190 - Mid-Tex Gas Division Addition 080.60826 37602 85
080 190 - Mid-Tex Gas Division Addition 080.60826 38000 28
080 190 - Mid-Tex Gas Division Addition 080.60844 37602 13
080 190 - Mid-Tex Gas Division Addition 080.60844 38000 3
080 190 - Mid-Tex Gas Division Addition 080.60847 37602 30
080 190 - Mid-Tex Gas Division Addition 080.60847 38000 8
080 190 - Mid-Tex Gas Division Addition 080.60852 37602 41
080 190 - Mid-Tex Gas Division Addition 080.60857 37602 57
080 190 - Mid-Tex Gas Division Addition 080.60857 38000 13
080 190 - Mid-Tex Gas Division Addition 080.60859 37602 35
080 190 - Mid-Tex Gas Division Addition 080.60859 38000 11
080 190 - Mid-Tex Gas Division Addition 080.60865 37602 30
080 190 - Mid-Tex Gas Division Addition 080.60865 38000 19
080 190 - Mid-Tex Gas Division Addition 080.60866 37602 25
080 190 - Mid-Tex Gas Division Addition 080.60866 38000 4
080 190 - Mid-Tex Gas Division Addition 080.60868 37602 102
080 190 - Mid-Tex Gas Division Addition 080.60868 38000 17
080 190 - Mid-Tex Gas Division Addition 080.60871 37602 79
080 190 - Mid-Tex Gas Division Addition 080.60871 37800 21
080 190 - Mid-Tex Gas Division Addition 080.60871 38000 5
080 190 - Mid-Tex Gas Division Addition 080.60872 37602 32
080 190 - Mid-Tex Gas Division Addition 080.60872 38000 6
080 190 - Mid-Tex Gas Division Addition 080.60878 37602 1,044
080 190 - Mid-Tex Gas Division Addition 080.60878 38000 1,044
080 190 - Mid-Tex Gas Division Addition 080.60879 37800 3
080 190 - Mid-Tex Gas Division Addition 080.60886 37602 488,225
080 190 - Mid-Tex Gas Division Addition 080.60894 37602 28
080 190 - Mid-Tex Gas Division Addition 080.60894 38000 5
080 190 - Mid-Tex Gas Division Addition 080.60897 37602 327
080 190 - Mid-Tex Gas Division Addition 080.60897 38000 36
080 190 - Mid-Tex Gas Division Addition 080.60898 37602 168,475
080 190 - Mid-Tex Gas Division Addition 080.60899 37601 128
080 190 - Mid-Tex Gas Division Addition 080.60911 37602 26
080 190 - Mid-Tex Gas Division Addition 080.60914 37602 45
080 190 - Mid-Tex Gas Division Addition 080.60917 37600 7,276
080 190 - Mid-Tex Gas Division Addition 080.60917 37800 808
080 190 - Mid-Tex Gas Division Addition 080.60922 37602 181
080 190 - Mid-Tex Gas Division Addition 080.60930 37602 109
080 190 - Mid-Tex Gas Division Addition 080.60930 38000 2
080 190 - Mid-Tex Gas Division Addition 080.60931 37602 9
080 190 - Mid-Tex Gas Division Addition 080.60931 38000 2
080 190 - Mid-Tex Gas Division Addition 080.60933 37602 51
080 190 - Mid-Tex Gas Division Addition 080.60933 38000 2
080 190 - Mid-Tex Gas Division Addition 080.60934 37602 47
080 190 - Mid-Tex Gas Division Addition 080.60934 38000 1
080 190 - Mid-Tex Gas Division Addition 080.60942 37602 57
080 190 - Mid-Tex Gas Division Addition 080.60942 38000 6
080 190 - Mid-Tex Gas Division Addition 080.60943 37602 11,138,105
080 190 - Mid-Tex Gas Division Addition 080.60943 38000 (4,477,953)
080 190 - Mid-Tex Gas Division Addition 080.60944 37602 456,020
MTX Additions by FERC
Page 28 of 101
426
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.60944 38000 (366,075)
080 190 - Mid-Tex Gas Division Addition 080.60946 37602 8,557
080 190 - Mid-Tex Gas Division Addition 080.60946 38000 2,395
080 190 - Mid-Tex Gas Division Addition 080.60960 37602 25
080 190 - Mid-Tex Gas Division Addition 080.60960 38000 1
080 190 - Mid-Tex Gas Division Addition 080.60967 37602 50
080 190 - Mid-Tex Gas Division Addition 080.60967 38000 3
080 190 - Mid-Tex Gas Division Addition 080.61000 37602 251
080 190 - Mid-Tex Gas Division Addition 080.61000 38000 28
080 190 - Mid-Tex Gas Division Addition 080.61007 37602 32
080 190 - Mid-Tex Gas Division Addition 080.61007 38000 4
080 190 - Mid-Tex Gas Division Addition 080.61042 37602 13
080 190 - Mid-Tex Gas Division Addition 080.61058 37600 14
080 190 - Mid-Tex Gas Division Addition 080.61058 37602 707
080 190 - Mid-Tex Gas Division Addition 080.61069 37602 15
080 190 - Mid-Tex Gas Division Addition 080.61071 37602 78
080 190 - Mid-Tex Gas Division Addition 080.61071 38000 2
080 190 - Mid-Tex Gas Division Addition 080.61072 37602 15
080 190 - Mid-Tex Gas Division Addition 080.61072 38000 5
080 190 - Mid-Tex Gas Division Addition 080.61075 37602 (15)
080 190 - Mid-Tex Gas Division Addition 080.61087 37602 29
080 190 - Mid-Tex Gas Division Addition 080.61087 38000 2
080 190 - Mid-Tex Gas Division Addition 080.61088 37800 1
080 190 - Mid-Tex Gas Division Addition 080.61101 37602 2,048
080 190 - Mid-Tex Gas Division Addition 080.61116 37602 5
080 190 - Mid-Tex Gas Division Addition 080.61119 37602 19
080 190 - Mid-Tex Gas Division Addition 080.61121 37602 7,240
080 190 - Mid-Tex Gas Division Addition 080.61121 38000 505
080 190 - Mid-Tex Gas Division Addition 080.61133 37800 19
080 190 - Mid-Tex Gas Division Addition 080.61144 37602 15
080 190 - Mid-Tex Gas Division Addition 080.61146 38000 332
080 190 - Mid-Tex Gas Division Addition 080.61162 37602 13
080 190 - Mid-Tex Gas Division Addition 080.61165 37601 0
080 190 - Mid-Tex Gas Division Addition 080.61182 37602 359
080 190 - Mid-Tex Gas Division Addition 080.61182 38000 19
080 190 - Mid-Tex Gas Division Addition 080.61183 37602 145
080 190 - Mid-Tex Gas Division Addition 080.61183 38000 8
080 190 - Mid-Tex Gas Division Addition 080.61193 37602 27
080 190 - Mid-Tex Gas Division Addition 080.61193 38000 9
080 190 - Mid-Tex Gas Division Addition 080.61196 37601 41
080 190 - Mid-Tex Gas Division Addition 080.61196 37602 41
080 190 - Mid-Tex Gas Division Addition 080.61196 37800 122
080 190 - Mid-Tex Gas Division Addition 080.61204 37602 4
080 190 - Mid-Tex Gas Division Addition 080.61204 38000 0
080 190 - Mid-Tex Gas Division Addition 080.61214 37601 117,116
080 190 - Mid-Tex Gas Division Addition 080.61214 37602 29,279
080 190 - Mid-Tex Gas Division Addition 080.61216 37601 35
080 190 - Mid-Tex Gas Division Addition 080.61216 37800 9
080 190 - Mid-Tex Gas Division Addition 080.61227 37602 42
080 190 - Mid-Tex Gas Division Addition 080.61227 38000 2
080 190 - Mid-Tex Gas Division Addition 080.61247 37602 85,701
080 190 - Mid-Tex Gas Division Addition 080.61247 38000 9,522
080 190 - Mid-Tex Gas Division Addition 080.61259 37602 61
080 190 - Mid-Tex Gas Division Addition 080.61272 37602 7
080 190 - Mid-Tex Gas Division Addition 080.61272 38000 1
080 190 - Mid-Tex Gas Division Addition 080.61273 37602 9
080 190 - Mid-Tex Gas Division Addition 080.61273 38000 3
080 190 - Mid-Tex Gas Division Addition 080.61278 37602 729
080 190 - Mid-Tex Gas Division Addition 080.61300 37602 1,649
080 190 - Mid-Tex Gas Division Addition 080.61305 37602 10
080 190 - Mid-Tex Gas Division Addition 080.61307 37602 162
080 190 - Mid-Tex Gas Division Addition 080.61307 38000 29
080 190 - Mid-Tex Gas Division Addition 080.61310 37602 7,503
080 190 - Mid-Tex Gas Division Addition 080.61310 38000 153
080 190 - Mid-Tex Gas Division Addition 080.61312 37602 38
080 190 - Mid-Tex Gas Division Addition 080.61312 38000 13
080 190 - Mid-Tex Gas Division Addition 080.61319 37800 2
080 190 - Mid-Tex Gas Division Addition 080.61325 37602 2
080 190 - Mid-Tex Gas Division Addition 080.61325 38000 0
080 190 - Mid-Tex Gas Division Addition 080.61326 37602 4,199
080 190 - Mid-Tex Gas Division Addition 080.61326 38000 922
080 190 - Mid-Tex Gas Division Addition 080.61327 37602 1,874
080 190 - Mid-Tex Gas Division Addition 080.61327 38000 460
080 190 - Mid-Tex Gas Division Addition 080.61338 37602 266
080 190 - Mid-Tex Gas Division Addition 080.61338 38000 125
080 190 - Mid-Tex Gas Division Addition 080.61343 37602 909
080 190 - Mid-Tex Gas Division Addition 080.61343 38000 348
080 190 - Mid-Tex Gas Division Addition 080.61348 37602 1,656
080 190 - Mid-Tex Gas Division Addition 080.61348 38000 414
080 190 - Mid-Tex Gas Division Addition 080.61362 37602 9,892
080 190 - Mid-Tex Gas Division Addition 080.61362 38000 412
080 190 - Mid-Tex Gas Division Addition 080.61371 37602 583
080 190 - Mid-Tex Gas Division Addition 080.61371 38000 128
080 190 - Mid-Tex Gas Division Addition 080.61373 37602 7,010
080 190 - Mid-Tex Gas Division Addition 080.61375 37602 23
080 190 - Mid-Tex Gas Division Addition 080.61392 37601 18,360
080 190 - Mid-Tex Gas Division Addition 080.61398 37602 26
080 190 - Mid-Tex Gas Division Addition 080.61398 38000 26
080 190 - Mid-Tex Gas Division Addition 080.61404 37602 4
080 190 - Mid-Tex Gas Division Addition 080.61408 37602 8
080 190 - Mid-Tex Gas Division Addition 080.61410 37602 158
080 190 - Mid-Tex Gas Division Addition 080.61410 38000 8
080 190 - Mid-Tex Gas Division Addition 080.61414 37601 1,048
080 190 - Mid-Tex Gas Division Addition 080.61414 37602 28,964
080 190 - Mid-Tex Gas Division Addition 080.61414 38000 3,669
080 190 - Mid-Tex Gas Division Addition 080.61436 37602 40
080 190 - Mid-Tex Gas Division Addition 080.61436 38000 22
080 190 - Mid-Tex Gas Division Addition 080.61438 37602 167
080 190 - Mid-Tex Gas Division Addition 080.61438 38000 19
080 190 - Mid-Tex Gas Division Addition 080.61444 37602 721
080 190 - Mid-Tex Gas Division Addition 080.61444 38000 267
080 190 - Mid-Tex Gas Division Addition 080.61448 37602 15
080 190 - Mid-Tex Gas Division Addition 080.61453 37602 (545)
080 190 - Mid-Tex Gas Division Addition 080.61453 38000 (136)
080 190 - Mid-Tex Gas Division Addition 080.61461 37602 33
080 190 - Mid-Tex Gas Division Addition 080.61462 37602 2,329
080 190 - Mid-Tex Gas Division Addition 080.61462 38000 1,552
MTX Additions by FERC
Page 29 of 101
427
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.61475 37602 231
080 190 - Mid-Tex Gas Division Addition 080.61475 38000 12
080 190 - Mid-Tex Gas Division Addition 080.61482 37602 31
080 190 - Mid-Tex Gas Division Addition 080.61482 38000 21
080 190 - Mid-Tex Gas Division Addition 080.61488 37602 47
080 190 - Mid-Tex Gas Division Addition 080.61488 38000 8
080 190 - Mid-Tex Gas Division Addition 080.61493 37602 5
080 190 - Mid-Tex Gas Division Addition 080.61493 38000 0
080 190 - Mid-Tex Gas Division Addition 080.61502 37602 3
080 190 - Mid-Tex Gas Division Addition 080.61502 38000 0
080 190 - Mid-Tex Gas Division Addition 080.61533 37602 73
080 190 - Mid-Tex Gas Division Addition 080.61533 38000 2
080 190 - Mid-Tex Gas Division Addition 080.61538 37601 3
080 190 - Mid-Tex Gas Division Addition 080.61540 37602 486
080 190 - Mid-Tex Gas Division Addition 080.61540 38000 37
080 190 - Mid-Tex Gas Division Addition 080.61544 37602 4,150
080 190 - Mid-Tex Gas Division Addition 080.61544 38000 1,310
080 190 - Mid-Tex Gas Division Addition 080.61545 37602 2
080 190 - Mid-Tex Gas Division Addition 080.61552 37602 3,986
080 190 - Mid-Tex Gas Division Addition 080.61552 38000 210
080 190 - Mid-Tex Gas Division Addition 080.61558 37900 3
080 190 - Mid-Tex Gas Division Addition 080.61566 37602 1,294
080 190 - Mid-Tex Gas Division Addition 080.61566 38000 68
080 190 - Mid-Tex Gas Division Addition 080.61573 37602 138
080 190 - Mid-Tex Gas Division Addition 080.61573 38000 15
080 190 - Mid-Tex Gas Division Addition 080.61594 37602 21,548,148
080 190 - Mid-Tex Gas Division Addition 080.61594 38000 21,191,977
080 190 - Mid-Tex Gas Division Addition 080.61595 37602 7,162,716
080 190 - Mid-Tex Gas Division Addition 080.61595 38000 5,474,020
080 190 - Mid-Tex Gas Division Addition 080.61597 37602 1,130,480
080 190 - Mid-Tex Gas Division Addition 080.61597 38000 953,407
080 190 - Mid-Tex Gas Division Addition 080.61600 37602 20
080 190 - Mid-Tex Gas Division Addition 080.61600 38000 5
080 190 - Mid-Tex Gas Division Addition 080.61622 37602 78,079
080 190 - Mid-Tex Gas Division Addition 080.61622 38000 4,121
080 190 - Mid-Tex Gas Division Addition 080.61625 37601 5,597
080 190 - Mid-Tex Gas Division Addition 080.61630 37600 7
080 190 - Mid-Tex Gas Division Addition 080.61634 37602 603
080 190 - Mid-Tex Gas Division Addition 080.61634 38000 151
080 190 - Mid-Tex Gas Division Addition 080.61641 37601 23
080 190 - Mid-Tex Gas Division Addition 080.61651 37602 17
080 190 - Mid-Tex Gas Division Addition 080.61652 37602 221,115
080 190 - Mid-Tex Gas Division Addition 080.61652 38000 14,114
080 190 - Mid-Tex Gas Division Addition 080.61671 37602 12
080 190 - Mid-Tex Gas Division Addition 080.61672 37602 195
080 190 - Mid-Tex Gas Division Addition 080.61672 38000 10
080 190 - Mid-Tex Gas Division Addition 080.61677 37602 14
080 190 - Mid-Tex Gas Division Addition 080.61684 37601 12
080 190 - Mid-Tex Gas Division Addition 080.61686 37602 3,837
080 190 - Mid-Tex Gas Division Addition 080.61686 38000 1,279
080 190 - Mid-Tex Gas Division Addition 080.61688 37602 3,323
080 190 - Mid-Tex Gas Division Addition 080.61688 38000 831
080 190 - Mid-Tex Gas Division Addition 080.61692 37601 39
080 190 - Mid-Tex Gas Division Addition 080.61696 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.61699 37602 1,802
080 190 - Mid-Tex Gas Division Addition 080.61699 38000 601
080 190 - Mid-Tex Gas Division Addition 080.61702 37602 2,144
080 190 - Mid-Tex Gas Division Addition 080.61702 38000 715
080 190 - Mid-Tex Gas Division Addition 080.61715 37602 2
080 190 - Mid-Tex Gas Division Addition 080.61716 37602 21
080 190 - Mid-Tex Gas Division Addition 080.61718 37602 848
080 190 - Mid-Tex Gas Division Addition 080.61718 38000 208
080 190 - Mid-Tex Gas Division Addition 080.61721 37602 26
080 190 - Mid-Tex Gas Division Addition 080.61724 37602 21
080 190 - Mid-Tex Gas Division Addition 080.61724 38000 1
080 190 - Mid-Tex Gas Division Addition 080.61750 37602 53
080 190 - Mid-Tex Gas Division Addition 080.61750 38000 6
080 190 - Mid-Tex Gas Division Addition 080.61774 37602 8
080 190 - Mid-Tex Gas Division Addition 080.61774 37800 1
080 190 - Mid-Tex Gas Division Addition 080.61787 37602 410
080 190 - Mid-Tex Gas Division Addition 080.61794 37602 5
080 190 - Mid-Tex Gas Division Addition 080.61794 37800 19
080 190 - Mid-Tex Gas Division Addition 080.61795 37602 35
080 190 - Mid-Tex Gas Division Addition 080.61795 38000 9
080 190 - Mid-Tex Gas Division Addition 080.61799 37602 2,448
080 190 - Mid-Tex Gas Division Addition 080.61799 38000 129
080 190 - Mid-Tex Gas Division Addition 080.61807 37601 45
080 190 - Mid-Tex Gas Division Addition 080.61845 37601 3
080 190 - Mid-Tex Gas Division Addition 080.61855 37602 9
080 190 - Mid-Tex Gas Division Addition 080.61855 38000 0
080 190 - Mid-Tex Gas Division Addition 080.61880 37602 877
080 190 - Mid-Tex Gas Division Addition 080.61884 37602 390
080 190 - Mid-Tex Gas Division Addition 080.61884 38000 25
080 190 - Mid-Tex Gas Division Addition 080.61891 37602 133
080 190 - Mid-Tex Gas Division Addition 080.61891 38000 1
080 190 - Mid-Tex Gas Division Addition 080.61892 37602 21
080 190 - Mid-Tex Gas Division Addition 080.61892 38000 1
080 190 - Mid-Tex Gas Division Addition 080.61893 37602 15
080 190 - Mid-Tex Gas Division Addition 080.61893 38000 1
080 190 - Mid-Tex Gas Division Addition 080.61899 37602 14
080 190 - Mid-Tex Gas Division Addition 080.61903 37602 20
080 190 - Mid-Tex Gas Division Addition 080.61912 37602 1,042
080 190 - Mid-Tex Gas Division Addition 080.61912 38000 50
080 190 - Mid-Tex Gas Division Addition 080.61916 37602 74
080 190 - Mid-Tex Gas Division Addition 080.61916 38000 8
080 190 - Mid-Tex Gas Division Addition 080.61918 37602 26,959
080 190 - Mid-Tex Gas Division Addition 080.61918 38000 1,424
080 190 - Mid-Tex Gas Division Addition 080.61919 37800 8
080 190 - Mid-Tex Gas Division Addition 080.61928 37602 1,108
080 190 - Mid-Tex Gas Division Addition 080.61930 37602 2,396
080 190 - Mid-Tex Gas Division Addition 080.61930 38000 562
080 190 - Mid-Tex Gas Division Addition 080.61931 37602 107
080 190 - Mid-Tex Gas Division Addition 080.61931 38000 46
080 190 - Mid-Tex Gas Division Addition 080.61937 37602 1,414
080 190 - Mid-Tex Gas Division Addition 080.61937 38000 74
080 190 - Mid-Tex Gas Division Addition 080.61944 37602 1
080 190 - Mid-Tex Gas Division Addition 080.61946 37602 3
MTX Additions by FERC
Page 30 of 101
428
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.61947 37602 47
080 190 - Mid-Tex Gas Division Addition 080.61947 37800 13
080 190 - Mid-Tex Gas Division Addition 080.61947 38000 7
080 190 - Mid-Tex Gas Division Addition 080.61964 37602 3,427
080 190 - Mid-Tex Gas Division Addition 080.61964 38000 381
080 190 - Mid-Tex Gas Division Addition 080.61965 37601 23,631
080 190 - Mid-Tex Gas Division Addition 080.61965 37602 2,110
080 190 - Mid-Tex Gas Division Addition 080.61965 37800 16,457
080 190 - Mid-Tex Gas Division Addition 080.61985 37602 20
080 190 - Mid-Tex Gas Division Addition 080.61985 38000 0
080 190 - Mid-Tex Gas Division Addition 080.61989 37602 2,803
080 190 - Mid-Tex Gas Division Addition 080.61989 38000 294
080 190 - Mid-Tex Gas Division Addition 080.61991 37602 54
080 190 - Mid-Tex Gas Division Addition 080.61991 38000 15
080 190 - Mid-Tex Gas Division Addition 080.61994 37602 131
080 190 - Mid-Tex Gas Division Addition 080.61995 37602 80,255
080 190 - Mid-Tex Gas Division Addition 080.61995 38000 8,914
080 190 - Mid-Tex Gas Division Addition 080.62004 37602 1,764
080 190 - Mid-Tex Gas Division Addition 080.62004 38000 441
080 190 - Mid-Tex Gas Division Addition 080.62014 37602 484
080 190 - Mid-Tex Gas Division Addition 080.62014 38000 7
080 190 - Mid-Tex Gas Division Addition 080.62019 37602 6,853
080 190 - Mid-Tex Gas Division Addition 080.62019 38000 1,822
080 190 - Mid-Tex Gas Division Addition 080.62034 37602 857
080 190 - Mid-Tex Gas Division Addition 080.62034 38000 9
080 190 - Mid-Tex Gas Division Addition 080.62036 37601 36
080 190 - Mid-Tex Gas Division Addition 080.62036 37602 3,514
080 190 - Mid-Tex Gas Division Addition 080.62036 38000 72
080 190 - Mid-Tex Gas Division Addition 080.62044 37602 387
080 190 - Mid-Tex Gas Division Addition 080.62044 38000 43
080 190 - Mid-Tex Gas Division Addition 080.62048 37602 (45)
080 190 - Mid-Tex Gas Division Addition 080.62049 37602 877
080 190 - Mid-Tex Gas Division Addition 080.62049 38000 292
080 190 - Mid-Tex Gas Division Addition 080.62052 37602 1,323
080 190 - Mid-Tex Gas Division Addition 080.62052 37800 27
080 190 - Mid-Tex Gas Division Addition 080.62053 37602 748
080 190 - Mid-Tex Gas Division Addition 080.62053 38000 249
080 190 - Mid-Tex Gas Division Addition 080.62055 37602 12
080 190 - Mid-Tex Gas Division Addition 080.62055 38000 1
080 190 - Mid-Tex Gas Division Addition 080.62065 37602 11
080 190 - Mid-Tex Gas Division Addition 080.62065 38000 0
080 190 - Mid-Tex Gas Division Addition 080.62070 37602 29
080 190 - Mid-Tex Gas Division Addition 080.62070 38000 86
080 190 - Mid-Tex Gas Division Addition 080.62072 37602 137
080 190 - Mid-Tex Gas Division Addition 080.62072 37800 372
080 190 - Mid-Tex Gas Division Addition 080.62084 37602 10
080 190 - Mid-Tex Gas Division Addition 080.62089 37601 0
080 190 - Mid-Tex Gas Division Addition 080.62092 37602 98,408
080 190 - Mid-Tex Gas Division Addition 080.62093 37602 58,741
080 190 - Mid-Tex Gas Division Addition 080.62093 38000 3,092
080 190 - Mid-Tex Gas Division Addition 080.62099 37602 4
080 190 - Mid-Tex Gas Division Addition 080.62099 38000 1
080 190 - Mid-Tex Gas Division Addition 080.62102 37602 2,104
080 190 - Mid-Tex Gas Division Addition 080.62102 38000 111
080 190 - Mid-Tex Gas Division Addition 080.62146 37602 45
080 190 - Mid-Tex Gas Division Addition 080.62146 38000 19
080 190 - Mid-Tex Gas Division Addition 080.62151 37602 46
080 190 - Mid-Tex Gas Division Addition 080.62160 37602 3,585
080 190 - Mid-Tex Gas Division Addition 080.62160 38000 396
080 190 - Mid-Tex Gas Division Addition 080.62174 37602 91
080 190 - Mid-Tex Gas Division Addition 080.62184 37601 0
080 190 - Mid-Tex Gas Division Addition 080.62184 37602 2
080 190 - Mid-Tex Gas Division Addition 080.62184 37800 7
080 190 - Mid-Tex Gas Division Addition 080.62185 37601 -
080 190 - Mid-Tex Gas Division Addition 080.62185 37602 0
080 190 - Mid-Tex Gas Division Addition 080.62185 37800 4
080 190 - Mid-Tex Gas Division Addition 080.62192 37602 102
080 190 - Mid-Tex Gas Division Addition 080.62192 38000 3
080 190 - Mid-Tex Gas Division Addition 080.62202 37602 484
080 190 - Mid-Tex Gas Division Addition 080.62202 38000 53
080 190 - Mid-Tex Gas Division Addition 080.62203 37602 25
080 190 - Mid-Tex Gas Division Addition 080.62204 37602 2,954
080 190 - Mid-Tex Gas Division Addition 080.62204 38000 328
080 190 - Mid-Tex Gas Division Addition 080.62206 37602 2,718
080 190 - Mid-Tex Gas Division Addition 080.62206 38000 679
080 190 - Mid-Tex Gas Division Addition 080.62210 37602 764
080 190 - Mid-Tex Gas Division Addition 080.62210 38000 68
080 190 - Mid-Tex Gas Division Addition 080.62211 37602 3,008
080 190 - Mid-Tex Gas Division Addition 080.62211 38000 752
080 190 - Mid-Tex Gas Division Addition 080.62212 37602 2,257
080 190 - Mid-Tex Gas Division Addition 080.62212 38000 564
080 190 - Mid-Tex Gas Division Addition 080.62213 37602 48,315
080 190 - Mid-Tex Gas Division Addition 080.62213 38000 12,079
080 190 - Mid-Tex Gas Division Addition 080.62218 37602 159
080 190 - Mid-Tex Gas Division Addition 080.62218 38000 68
080 190 - Mid-Tex Gas Division Addition 080.62219 37602 738
080 190 - Mid-Tex Gas Division Addition 080.62219 38000 221
080 190 - Mid-Tex Gas Division Addition 080.62221 37600 523
080 190 - Mid-Tex Gas Division Addition 080.62227 37602 16,082
080 190 - Mid-Tex Gas Division Addition 080.62229 37602 948
080 190 - Mid-Tex Gas Division Addition 080.62236 37601 (348,055)
080 190 - Mid-Tex Gas Division Addition 080.62236 37602 2,151,815
080 190 - Mid-Tex Gas Division Addition 080.62236 38000 257,001
080 190 - Mid-Tex Gas Division Addition 080.62276 37602 602
080 190 - Mid-Tex Gas Division Addition 080.62276 38000 32
080 190 - Mid-Tex Gas Division Addition 080.62278 37602 25,087
080 190 - Mid-Tex Gas Division Addition 080.62278 38000 8,362
080 190 - Mid-Tex Gas Division Addition 080.62279 37601 2,837
080 190 - Mid-Tex Gas Division Addition 080.62280 37602 1,758
080 190 - Mid-Tex Gas Division Addition 080.62280 38000 310
080 190 - Mid-Tex Gas Division Addition 080.62283 37602 53
080 190 - Mid-Tex Gas Division Addition 080.62295 37602 (149)
080 190 - Mid-Tex Gas Division Addition 080.62295 38000 (24)
080 190 - Mid-Tex Gas Division Addition 080.62297 37602 2,098
080 190 - Mid-Tex Gas Division Addition 080.62297 38000 1,399
080 190 - Mid-Tex Gas Division Addition 080.62303 37800 565
080 190 - Mid-Tex Gas Division Addition 080.62309 37602 2,703
MTX Additions by FERC
Page 31 of 101
429
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.62309 38000 676
080 190 - Mid-Tex Gas Division Addition 080.62310 37602 21,198
080 190 - Mid-Tex Gas Division Addition 080.62310 38000 883
080 190 - Mid-Tex Gas Division Addition 080.62311 37602 16,701
080 190 - Mid-Tex Gas Division Addition 080.62312 37602 4,429
080 190 - Mid-Tex Gas Division Addition 080.62312 38000 333
080 190 - Mid-Tex Gas Division Addition 080.62313 37602 21,560
080 190 - Mid-Tex Gas Division Addition 080.62313 38000 7,187
080 190 - Mid-Tex Gas Division Addition 080.62315 37602 5,509
080 190 - Mid-Tex Gas Division Addition 080.62328 37602 59
080 190 - Mid-Tex Gas Division Addition 080.62333 37601 0
080 190 - Mid-Tex Gas Division Addition 080.62333 37602 1
080 190 - Mid-Tex Gas Division Addition 080.62336 37800 (7)
080 190 - Mid-Tex Gas Division Addition 080.62338 37602 13
080 190 - Mid-Tex Gas Division Addition 080.62338 38000 0
080 190 - Mid-Tex Gas Division Addition 080.62339 37800 (0)
080 190 - Mid-Tex Gas Division Addition 080.62341 37800 (0)
080 190 - Mid-Tex Gas Division Addition 080.62357 37602 17,182
080 190 - Mid-Tex Gas Division Addition 080.62357 38000 3,772
080 190 - Mid-Tex Gas Division Addition 080.62358 37602 11,698
080 190 - Mid-Tex Gas Division Addition 080.62358 38000 239
080 190 - Mid-Tex Gas Division Addition 080.62359 37602 1,311
080 190 - Mid-Tex Gas Division Addition 080.62359 38000 69
080 190 - Mid-Tex Gas Division Addition 080.62366 37602 7,058
080 190 - Mid-Tex Gas Division Addition 080.62366 38000 371
080 190 - Mid-Tex Gas Division Addition 080.62376 37602 117
080 190 - Mid-Tex Gas Division Addition 080.62376 38000 13
080 190 - Mid-Tex Gas Division Addition 080.62380 37602 2,888
080 190 - Mid-Tex Gas Division Addition 080.62380 38000 287
080 190 - Mid-Tex Gas Division Addition 080.62382 37602 45
080 190 - Mid-Tex Gas Division Addition 080.62382 38000 2
080 190 - Mid-Tex Gas Division Addition 080.62383 37602 1,876
080 190 - Mid-Tex Gas Division Addition 080.62383 38000 208
080 190 - Mid-Tex Gas Division Addition 080.62386 37602 22
080 190 - Mid-Tex Gas Division Addition 080.62386 38000 2
080 190 - Mid-Tex Gas Division Addition 080.62387 37602 7
080 190 - Mid-Tex Gas Division Addition 080.62387 38000 1
080 190 - Mid-Tex Gas Division Addition 080.62391 37601 3,772
080 190 - Mid-Tex Gas Division Addition 080.62391 37602 2,829
080 190 - Mid-Tex Gas Division Addition 080.62397 37602 2
080 190 - Mid-Tex Gas Division Addition 080.62398 37602 -
080 190 - Mid-Tex Gas Division Addition 080.62398 38000 -
080 190 - Mid-Tex Gas Division Addition 080.62399 37602 49,625
080 190 - Mid-Tex Gas Division Addition 080.62399 38000 2,610
080 190 - Mid-Tex Gas Division Addition 080.62404 37602 197
080 190 - Mid-Tex Gas Division Addition 080.62408 37602 3
080 190 - Mid-Tex Gas Division Addition 080.62409 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.62419 37602 318
080 190 - Mid-Tex Gas Division Addition 080.62419 38000 106
080 190 - Mid-Tex Gas Division Addition 080.62420 37602 5,192
080 190 - Mid-Tex Gas Division Addition 080.62420 38000 1,732
080 190 - Mid-Tex Gas Division Addition 080.62422 37602 31,736
080 190 - Mid-Tex Gas Division Addition 080.62423 37601 85,294
080 190 - Mid-Tex Gas Division Addition 080.62423 37800 2,638
080 190 - Mid-Tex Gas Division Addition 080.62425 37602 7,975
080 190 - Mid-Tex Gas Division Addition 080.62425 38000 3,418
080 190 - Mid-Tex Gas Division Addition 080.62439 37602 1,580
080 190 - Mid-Tex Gas Division Addition 080.62439 38000 526
080 190 - Mid-Tex Gas Division Addition 080.62440 37602 -
080 190 - Mid-Tex Gas Division Addition 080.62441 37602 3,448
080 190 - Mid-Tex Gas Division Addition 080.62441 38000 862
080 190 - Mid-Tex Gas Division Addition 080.62447 38000 1,748
080 190 - Mid-Tex Gas Division Addition 080.62448 37602 16
080 190 - Mid-Tex Gas Division Addition 080.62457 37602 93
080 190 - Mid-Tex Gas Division Addition 080.62457 37800 280
080 190 - Mid-Tex Gas Division Addition 080.62461 37602 6,788
080 190 - Mid-Tex Gas Division Addition 080.62492 37602 3,228
080 190 - Mid-Tex Gas Division Addition 080.62492 38000 806
080 190 - Mid-Tex Gas Division Addition 080.62513 37602 2,022
080 190 - Mid-Tex Gas Division Addition 080.62513 38000 41
080 190 - Mid-Tex Gas Division Addition 080.62517 37602 149
080 190 - Mid-Tex Gas Division Addition 080.62517 38000 17
080 190 - Mid-Tex Gas Division Addition 080.62523 37602 23
080 190 - Mid-Tex Gas Division Addition 080.62527 37600 20
080 190 - Mid-Tex Gas Division Addition 080.62553 37602 81
080 190 - Mid-Tex Gas Division Addition 080.62553 38000 14
080 190 - Mid-Tex Gas Division Addition 080.62555 37602 3,091
080 190 - Mid-Tex Gas Division Addition 080.62555 38000 62
080 190 - Mid-Tex Gas Division Addition 080.62571 37601 2,621
080 190 - Mid-Tex Gas Division Addition 080.62571 37800 615
080 190 - Mid-Tex Gas Division Addition 080.62590 37800 (12)
080 190 - Mid-Tex Gas Division Addition 080.62609 37602 3,598
080 190 - Mid-Tex Gas Division Addition 080.62609 38000 1,938
080 190 - Mid-Tex Gas Division Addition 080.62612 37602 59
080 190 - Mid-Tex Gas Division Addition 080.62613 37602 23
080 190 - Mid-Tex Gas Division Addition 080.62613 38000 14
080 190 - Mid-Tex Gas Division Addition 080.62630 37602 1,683
080 190 - Mid-Tex Gas Division Addition 080.62635 37602 3
080 190 - Mid-Tex Gas Division Addition 080.62637 37800 42
080 190 - Mid-Tex Gas Division Addition 080.62639 37602 17
080 190 - Mid-Tex Gas Division Addition 080.62641 37602 160
080 190 - Mid-Tex Gas Division Addition 080.62641 38000 28
080 190 - Mid-Tex Gas Division Addition 080.62657 37602 2,674
080 190 - Mid-Tex Gas Division Addition 080.62657 38000 668
080 190 - Mid-Tex Gas Division Addition 080.62688 37601 24
080 190 - Mid-Tex Gas Division Addition 080.62689 37601 6,056
080 190 - Mid-Tex Gas Division Addition 080.62689 37800 3,785
080 190 - Mid-Tex Gas Division Addition 080.62690 37601 17
080 190 - Mid-Tex Gas Division Addition 080.62690 38000 2
080 190 - Mid-Tex Gas Division Addition 080.62691 37602 644
080 190 - Mid-Tex Gas Division Addition 080.62691 38000 138
080 190 - Mid-Tex Gas Division Addition 080.62693 37602 214,954
080 190 - Mid-Tex Gas Division Addition 080.62693 38000 (48,148)
080 190 - Mid-Tex Gas Division Addition 080.62700 37602 28,608
080 190 - Mid-Tex Gas Division Addition 080.62714 37602 81,036
080 190 - Mid-Tex Gas Division Addition 080.62716 37602 3,635
080 190 - Mid-Tex Gas Division Addition 080.62716 38000 909
MTX Additions by FERC
Page 32 of 101
430
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.62723 37602 856
080 190 - Mid-Tex Gas Division Addition 080.62723 38000 45
080 190 - Mid-Tex Gas Division Addition 080.62724 37602 913
080 190 - Mid-Tex Gas Division Addition 080.62724 38000 295
080 190 - Mid-Tex Gas Division Addition 080.62726 37602 5,727
080 190 - Mid-Tex Gas Division Addition 080.62726 38000 304
080 190 - Mid-Tex Gas Division Addition 080.62735 37602 226,133
080 190 - Mid-Tex Gas Division Addition 080.62735 38000 56,533
080 190 - Mid-Tex Gas Division Addition 080.62736 37602 5,662
080 190 - Mid-Tex Gas Division Addition 080.62736 38000 1,416
080 190 - Mid-Tex Gas Division Addition 080.62737 37602 1,129
080 190 - Mid-Tex Gas Division Addition 080.62737 37800 3,387
080 190 - Mid-Tex Gas Division Addition 080.62738 37602 87,258
080 190 - Mid-Tex Gas Division Addition 080.62738 38000 881
080 190 - Mid-Tex Gas Division Addition 080.62742 37602 3,449
080 190 - Mid-Tex Gas Division Addition 080.62742 38000 5,395
080 190 - Mid-Tex Gas Division Addition 080.62744 37602 176
080 190 - Mid-Tex Gas Division Addition 080.62744 38000 2
080 190 - Mid-Tex Gas Division Addition 080.62750 37602 -
080 190 - Mid-Tex Gas Division Addition 080.62752 37602 252
080 190 - Mid-Tex Gas Division Addition 080.62753 37601 20,663
080 190 - Mid-Tex Gas Division Addition 080.62753 37800 2,847
080 190 - Mid-Tex Gas Division Addition 080.62756 37800 3
080 190 - Mid-Tex Gas Division Addition 080.62759 37800 1,621
080 190 - Mid-Tex Gas Division Addition 080.62760 37602 15
080 190 - Mid-Tex Gas Division Addition 080.62763 37602 (1)
080 190 - Mid-Tex Gas Division Addition 080.62763 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.62765 37602 30,027
080 190 - Mid-Tex Gas Division Addition 080.62765 38000 4,888
080 190 - Mid-Tex Gas Division Addition 080.62778 37602 50
080 190 - Mid-Tex Gas Division Addition 080.62791 37602 369
080 190 - Mid-Tex Gas Division Addition 080.62791 38000 92
080 190 - Mid-Tex Gas Division Addition 080.62802 37602 2,165
080 190 - Mid-Tex Gas Division Addition 080.62805 37602 3,396
080 190 - Mid-Tex Gas Division Addition 080.62805 38000 602
080 190 - Mid-Tex Gas Division Addition 080.62806 37602 3,382
080 190 - Mid-Tex Gas Division Addition 080.62806 38000 845
080 190 - Mid-Tex Gas Division Addition 080.62812 37602 82
080 190 - Mid-Tex Gas Division Addition 080.62819 37602 2,293
080 190 - Mid-Tex Gas Division Addition 080.62824 37601 0
080 190 - Mid-Tex Gas Division Addition 080.62829 37602 6,717
080 190 - Mid-Tex Gas Division Addition 080.62829 38000 354
080 190 - Mid-Tex Gas Division Addition 080.62833 37602 6,012
080 190 - Mid-Tex Gas Division Addition 080.62834 37602 942
080 190 - Mid-Tex Gas Division Addition 080.62838 37602 2,418
080 190 - Mid-Tex Gas Division Addition 080.62838 38000 806
080 190 - Mid-Tex Gas Division Addition 080.62842 37602 2,791
080 190 - Mid-Tex Gas Division Addition 080.62842 37800 652
080 190 - Mid-Tex Gas Division Addition 080.62842 38000 181
080 190 - Mid-Tex Gas Division Addition 080.62845 37602 5,657
080 190 - Mid-Tex Gas Division Addition 080.62845 38000 613
080 190 - Mid-Tex Gas Division Addition 080.62850 37602 10,958
080 190 - Mid-Tex Gas Division Addition 080.62850 38000 224
080 190 - Mid-Tex Gas Division Addition 080.62866 37602 16
080 190 - Mid-Tex Gas Division Addition 080.62870 37602 1,721
080 190 - Mid-Tex Gas Division Addition 080.62870 38000 191
080 190 - Mid-Tex Gas Division Addition 080.62878 37602 20,568
080 190 - Mid-Tex Gas Division Addition 080.62878 38000 6,856
080 190 - Mid-Tex Gas Division Addition 080.62890 37602 1,323
080 190 - Mid-Tex Gas Division Addition 080.62890 38000 27
080 190 - Mid-Tex Gas Division Addition 080.62893 37602 30
080 190 - Mid-Tex Gas Division Addition 080.62893 38000 3
080 190 - Mid-Tex Gas Division Addition 080.62904 37602 122
080 190 - Mid-Tex Gas Division Addition 080.62917 37602 1,469
080 190 - Mid-Tex Gas Division Addition 080.62917 38000 77
080 190 - Mid-Tex Gas Division Addition 080.62930 37602 1
080 190 - Mid-Tex Gas Division Addition 080.62930 38000 3
080 190 - Mid-Tex Gas Division Addition 080.62950 37601 9,900
080 190 - Mid-Tex Gas Division Addition 080.62952 37602 164
080 190 - Mid-Tex Gas Division Addition 080.62952 38000 29
080 190 - Mid-Tex Gas Division Addition 080.62956 37602 29,764
080 190 - Mid-Tex Gas Division Addition 080.62956 38000 11,021
080 190 - Mid-Tex Gas Division Addition 080.62957 37602 750
080 190 - Mid-Tex Gas Division Addition 080.62957 38000 15
080 190 - Mid-Tex Gas Division Addition 080.62962 37602 424
080 190 - Mid-Tex Gas Division Addition 080.62962 38000 75
080 190 - Mid-Tex Gas Division Addition 080.62980 37601 288
080 190 - Mid-Tex Gas Division Addition 080.62980 37602 1,314
080 190 - Mid-Tex Gas Division Addition 080.62980 37800 3,509
080 190 - Mid-Tex Gas Division Addition 080.62991 37602 144
080 190 - Mid-Tex Gas Division Addition 080.62991 38000 25
080 190 - Mid-Tex Gas Division Addition 080.63002 37602 469
080 190 - Mid-Tex Gas Division Addition 080.63002 38000 103
080 190 - Mid-Tex Gas Division Addition 080.63010 37602 222
080 190 - Mid-Tex Gas Division Addition 080.63011 37602 194
080 190 - Mid-Tex Gas Division Addition 080.63011 37800 48
080 190 - Mid-Tex Gas Division Addition 080.63015 37602 17
080 190 - Mid-Tex Gas Division Addition 080.63015 38000 4
080 190 - Mid-Tex Gas Division Addition 080.63016 37602 5,747
080 190 - Mid-Tex Gas Division Addition 080.63016 38000 239
080 190 - Mid-Tex Gas Division Addition 080.63028 37602 1,330
080 190 - Mid-Tex Gas Division Addition 080.63028 38000 399
080 190 - Mid-Tex Gas Division Addition 080.63033 37602 1,061
080 190 - Mid-Tex Gas Division Addition 080.63038 37600 (5,357)
080 190 - Mid-Tex Gas Division Addition 080.63043 37602 1,157
080 190 - Mid-Tex Gas Division Addition 080.63043 38000 1,166
080 190 - Mid-Tex Gas Division Addition 080.63045 37602 82
080 190 - Mid-Tex Gas Division Addition 080.63048 37602 483
080 190 - Mid-Tex Gas Division Addition 080.63048 38000 54
080 190 - Mid-Tex Gas Division Addition 080.63049 37602 2,162
080 190 - Mid-Tex Gas Division Addition 080.63049 38000 541
080 190 - Mid-Tex Gas Division Addition 080.63053 37602 5
080 190 - Mid-Tex Gas Division Addition 080.63065 37602 866
080 190 - Mid-Tex Gas Division Addition 080.63065 38000 97
080 190 - Mid-Tex Gas Division Addition 080.63069 37602 5,273
080 190 - Mid-Tex Gas Division Addition 080.63069 38000 584
080 190 - Mid-Tex Gas Division Addition 080.63080 37601 6,350
MTX Additions by FERC
Page 33 of 101
431
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.63090 37602 213
080 190 - Mid-Tex Gas Division Addition 080.63090 38000 38
080 190 - Mid-Tex Gas Division Addition 080.63091 37602 1,378
080 190 - Mid-Tex Gas Division Addition 080.63091 38000 459
080 190 - Mid-Tex Gas Division Addition 080.63092 37602 191
080 190 - Mid-Tex Gas Division Addition 080.63092 38000 48
080 190 - Mid-Tex Gas Division Addition 080.63097 37602 5,541
080 190 - Mid-Tex Gas Division Addition 080.63100 37601 0
080 190 - Mid-Tex Gas Division Addition 080.63100 37602 4
080 190 - Mid-Tex Gas Division Addition 080.63100 37800 0
080 190 - Mid-Tex Gas Division Addition 080.63109 37601 33
080 190 - Mid-Tex Gas Division Addition 080.63112 37602 269
080 190 - Mid-Tex Gas Division Addition 080.63113 37602 3,319
080 190 - Mid-Tex Gas Division Addition 080.63113 38000 328
080 190 - Mid-Tex Gas Division Addition 080.63135 37602 108,423
080 190 - Mid-Tex Gas Division Addition 080.63135 38000 23,810
080 190 - Mid-Tex Gas Division Addition 080.63150 37602 187,904
080 190 - Mid-Tex Gas Division Addition 080.63150 38000 18,057
080 190 - Mid-Tex Gas Division Addition 080.63155 37602 36,653
080 190 - Mid-Tex Gas Division Addition 080.63155 38000 (977)
080 190 - Mid-Tex Gas Division Addition 080.63156 37602 687
080 190 - Mid-Tex Gas Division Addition 080.63159 37601 343
080 190 - Mid-Tex Gas Division Addition 080.63162 37602 1,126
080 190 - Mid-Tex Gas Division Addition 080.63162 38000 35
080 190 - Mid-Tex Gas Division Addition 080.63163 37602 1,183
080 190 - Mid-Tex Gas Division Addition 080.63164 37602 1,467
080 190 - Mid-Tex Gas Division Addition 080.63170 37601 2
080 190 - Mid-Tex Gas Division Addition 080.63172 37602 1,639
080 190 - Mid-Tex Gas Division Addition 080.63172 37800 105
080 190 - Mid-Tex Gas Division Addition 080.63177 37602 886
080 190 - Mid-Tex Gas Division Addition 080.63180 37602 1,670
080 190 - Mid-Tex Gas Division Addition 080.63180 38000 860
080 190 - Mid-Tex Gas Division Addition 080.63191 37601 2,976
080 190 - Mid-Tex Gas Division Addition 080.63193 37602 -
080 190 - Mid-Tex Gas Division Addition 080.63196 37602 53
080 190 - Mid-Tex Gas Division Addition 080.63198 37602 910
080 190 - Mid-Tex Gas Division Addition 080.63206 37602 505
080 190 - Mid-Tex Gas Division Addition 080.63206 38000 505
080 190 - Mid-Tex Gas Division Addition 080.63207 37602 2,365
080 190 - Mid-Tex Gas Division Addition 080.63212 37601 8,136
080 190 - Mid-Tex Gas Division Addition 080.63213 37602 11,167
080 190 - Mid-Tex Gas Division Addition 080.63213 38000 113
080 190 - Mid-Tex Gas Division Addition 080.63216 37602 122,686
080 190 - Mid-Tex Gas Division Addition 080.63216 38000 1,240
080 190 - Mid-Tex Gas Division Addition 080.63217 37602 807
080 190 - Mid-Tex Gas Division Addition 080.63222 37602 2,918
080 190 - Mid-Tex Gas Division Addition 080.63222 38000 729
080 190 - Mid-Tex Gas Division Addition 080.63232 37602 1,732
080 190 - Mid-Tex Gas Division Addition 080.63232 38000 192
080 190 - Mid-Tex Gas Division Addition 080.63236 37602 1,526
080 190 - Mid-Tex Gas Division Addition 080.63236 38000 31
080 190 - Mid-Tex Gas Division Addition 080.63240 37602 119
080 190 - Mid-Tex Gas Division Addition 080.63241 37602 1,715
080 190 - Mid-Tex Gas Division Addition 080.63241 38000 191
080 190 - Mid-Tex Gas Division Addition 080.63242 37602 1,836
080 190 - Mid-Tex Gas Division Addition 080.63242 38000 204
080 190 - Mid-Tex Gas Division Addition 080.63251 37602 16,038
080 190 - Mid-Tex Gas Division Addition 080.63251 38000 1,024
080 190 - Mid-Tex Gas Division Addition 080.63255 37602 11
080 190 - Mid-Tex Gas Division Addition 080.63256 38000 1,544
080 190 - Mid-Tex Gas Division Addition 080.63257 37800 5
080 190 - Mid-Tex Gas Division Addition 080.63271 37602 1,469
080 190 - Mid-Tex Gas Division Addition 080.63271 38000 45
080 190 - Mid-Tex Gas Division Addition 080.63279 37602 3,758
080 190 - Mid-Tex Gas Division Addition 080.63279 38000 77
080 190 - Mid-Tex Gas Division Addition 080.63284 37602 5,540
080 190 - Mid-Tex Gas Division Addition 080.63284 38000 616
080 190 - Mid-Tex Gas Division Addition 080.63298 37602 3,808
080 190 - Mid-Tex Gas Division Addition 080.63300 37602 859
080 190 - Mid-Tex Gas Division Addition 080.63300 38000 18
080 190 - Mid-Tex Gas Division Addition 080.63309 37602 30,412
080 190 - Mid-Tex Gas Division Addition 080.63312 38000 14,486
080 190 - Mid-Tex Gas Division Addition 080.63321 37602 1,472
080 190 - Mid-Tex Gas Division Addition 080.63321 38000 164
080 190 - Mid-Tex Gas Division Addition 080.63326 37602 13,129
080 190 - Mid-Tex Gas Division Addition 080.63331 37602 9,966
080 190 - Mid-Tex Gas Division Addition 080.63331 38000 1,107
080 190 - Mid-Tex Gas Division Addition 080.63336 37602 2,315
080 190 - Mid-Tex Gas Division Addition 080.63337 37601 138
080 190 - Mid-Tex Gas Division Addition 080.63337 37602 4,477
080 190 - Mid-Tex Gas Division Addition 080.63352 37602 2,783
080 190 - Mid-Tex Gas Division Addition 080.63363 37602 474
080 190 - Mid-Tex Gas Division Addition 080.63363 38000 25
080 190 - Mid-Tex Gas Division Addition 080.63368 37602 41
080 190 - Mid-Tex Gas Division Addition 080.63379 37602 19,203
080 190 - Mid-Tex Gas Division Addition 080.63381 37602 5,206
080 190 - Mid-Tex Gas Division Addition 080.63381 38000 710
080 190 - Mid-Tex Gas Division Addition 080.63389 37602 1,082
080 190 - Mid-Tex Gas Division Addition 080.63389 38000 271
080 190 - Mid-Tex Gas Division Addition 080.63394 37602 768
080 190 - Mid-Tex Gas Division Addition 080.63394 38000 256
080 190 - Mid-Tex Gas Division Addition 080.63398 37602 490
080 190 - Mid-Tex Gas Division Addition 080.63398 38000 54
080 190 - Mid-Tex Gas Division Addition 080.63404 37602 313
080 190 - Mid-Tex Gas Division Addition 080.63404 37800 157
080 190 - Mid-Tex Gas Division Addition 080.63408 37602 406
080 190 - Mid-Tex Gas Division Addition 080.63414 37602 5,175
080 190 - Mid-Tex Gas Division Addition 080.63414 38000 575
080 190 - Mid-Tex Gas Division Addition 080.63428 37602 1,649
080 190 - Mid-Tex Gas Division Addition 080.63428 38000 412
080 190 - Mid-Tex Gas Division Addition 080.63443 37602 145,572
080 190 - Mid-Tex Gas Division Addition 080.63457 37602 1,155
080 190 - Mid-Tex Gas Division Addition 080.63472 37602 265
080 190 - Mid-Tex Gas Division Addition 080.63472 38000 182
080 190 - Mid-Tex Gas Division Addition 080.63476 37800 40
080 190 - Mid-Tex Gas Division Addition 080.63477 37800 0
080 190 - Mid-Tex Gas Division Addition 080.63479 37800 617
MTX Additions by FERC
Page 34 of 101
432
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.63487 37601 6,407
080 190 - Mid-Tex Gas Division Addition 080.63492 37602 577
080 190 - Mid-Tex Gas Division Addition 080.63492 38000 247
080 190 - Mid-Tex Gas Division Addition 080.63493 37602 355
080 190 - Mid-Tex Gas Division Addition 080.63493 38000 19
080 190 - Mid-Tex Gas Division Addition 080.63495 37602 2,363
080 190 - Mid-Tex Gas Division Addition 080.63495 38000 1,897
080 190 - Mid-Tex Gas Division Addition 080.63496 37602 694
080 190 - Mid-Tex Gas Division Addition 080.63496 38000 173
080 190 - Mid-Tex Gas Division Addition 080.63502 37602 -
080 190 - Mid-Tex Gas Division Addition 080.63503 37602 4,465
080 190 - Mid-Tex Gas Division Addition 080.63507 37800 (2)
080 190 - Mid-Tex Gas Division Addition 080.63512 37602 10,608
080 190 - Mid-Tex Gas Division Addition 080.63512 38000 7,072
080 190 - Mid-Tex Gas Division Addition 080.63514 37602 1,511
080 190 - Mid-Tex Gas Division Addition 080.63514 38000 504
080 190 - Mid-Tex Gas Division Addition 080.63517 37800 79
080 190 - Mid-Tex Gas Division Addition 080.63519 37602 957
080 190 - Mid-Tex Gas Division Addition 080.63519 38000 169
080 190 - Mid-Tex Gas Division Addition 080.63525 37800 (37)
080 190 - Mid-Tex Gas Division Addition 080.63531 37602 1,015
080 190 - Mid-Tex Gas Division Addition 080.63531 38000 10
080 190 - Mid-Tex Gas Division Addition 080.63533 37602 2,258
080 190 - Mid-Tex Gas Division Addition 080.63533 38000 5,269
080 190 - Mid-Tex Gas Division Addition 080.63544 37602 3,679
080 190 - Mid-Tex Gas Division Addition 080.63544 38000 1,293
080 190 - Mid-Tex Gas Division Addition 080.63546 37602 3,950
080 190 - Mid-Tex Gas Division Addition 080.63546 38000 208
080 190 - Mid-Tex Gas Division Addition 080.63547 37602 27
080 190 - Mid-Tex Gas Division Addition 080.63547 38000 1
080 190 - Mid-Tex Gas Division Addition 080.63548 37602 1,343
080 190 - Mid-Tex Gas Division Addition 080.63548 38000 896
080 190 - Mid-Tex Gas Division Addition 080.63553 37800 (35)
080 190 - Mid-Tex Gas Division Addition 080.63557 37602 264
080 190 - Mid-Tex Gas Division Addition 080.63557 38000 8
080 190 - Mid-Tex Gas Division Addition 080.63570 37800 0
080 190 - Mid-Tex Gas Division Addition 080.63574 37602 2,526
080 190 - Mid-Tex Gas Division Addition 080.63574 38000 281
080 190 - Mid-Tex Gas Division Addition 080.63581 37602 1,516
080 190 - Mid-Tex Gas Division Addition 080.63581 38000 168
080 190 - Mid-Tex Gas Division Addition 080.63586 37602 3,762
080 190 - Mid-Tex Gas Division Addition 080.63586 38000 198
080 190 - Mid-Tex Gas Division Addition 080.63588 37602 430
080 190 - Mid-Tex Gas Division Addition 080.63589 37602 2,787
080 190 - Mid-Tex Gas Division Addition 080.63589 38000 492
080 190 - Mid-Tex Gas Division Addition 080.63590 37602 926
080 190 - Mid-Tex Gas Division Addition 080.63594 37800 2
080 190 - Mid-Tex Gas Division Addition 080.63603 37602 2,524
080 190 - Mid-Tex Gas Division Addition 080.63603 38000 133
080 190 - Mid-Tex Gas Division Addition 080.63606 37602 1,939
080 190 - Mid-Tex Gas Division Addition 080.63607 37602 4,698
080 190 - Mid-Tex Gas Division Addition 080.63607 38000 409
080 190 - Mid-Tex Gas Division Addition 080.63608 37602 702
080 190 - Mid-Tex Gas Division Addition 080.63608 38000 37
080 190 - Mid-Tex Gas Division Addition 080.63609 37600 484
080 190 - Mid-Tex Gas Division Addition 080.63610 37600 793
080 190 - Mid-Tex Gas Division Addition 080.63615 37602 1,371
080 190 - Mid-Tex Gas Division Addition 080.63615 38000 119
080 190 - Mid-Tex Gas Division Addition 080.63616 37602 1,947
080 190 - Mid-Tex Gas Division Addition 080.63616 38000 649
080 190 - Mid-Tex Gas Division Addition 080.63625 37602 335
080 190 - Mid-Tex Gas Division Addition 080.63632 37602 4,743
080 190 - Mid-Tex Gas Division Addition 080.63632 38000 527
080 190 - Mid-Tex Gas Division Addition 080.63644 37601 172,442
080 190 - Mid-Tex Gas Division Addition 080.63644 37800 11,007
080 190 - Mid-Tex Gas Division Addition 080.63646 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.63647 37602 852
080 190 - Mid-Tex Gas Division Addition 080.63647 38000 45
080 190 - Mid-Tex Gas Division Addition 080.63653 37602 1,877
080 190 - Mid-Tex Gas Division Addition 080.63653 38000 209
080 190 - Mid-Tex Gas Division Addition 080.63655 37602 36
080 190 - Mid-Tex Gas Division Addition 080.63674 37602 631
080 190 - Mid-Tex Gas Division Addition 080.63674 38000 210
080 190 - Mid-Tex Gas Division Addition 080.63677 37602 627
080 190 - Mid-Tex Gas Division Addition 080.63677 38000 157
080 190 - Mid-Tex Gas Division Addition 080.63679 37602 1,138
080 190 - Mid-Tex Gas Division Addition 080.63679 38000 285
080 190 - Mid-Tex Gas Division Addition 080.63680 37602 598
080 190 - Mid-Tex Gas Division Addition 080.63698 37800 7
080 190 - Mid-Tex Gas Division Addition 080.63700 37602 1,807
080 190 - Mid-Tex Gas Division Addition 080.63701 37602 2,770
080 190 - Mid-Tex Gas Division Addition 080.63701 38000 1,187
080 190 - Mid-Tex Gas Division Addition 080.63702 37602 12,566
080 190 - Mid-Tex Gas Division Addition 080.63702 38000 5,386
080 190 - Mid-Tex Gas Division Addition 080.63703 37602 19,360
080 190 - Mid-Tex Gas Division Addition 080.63703 38000 4,836
080 190 - Mid-Tex Gas Division Addition 080.63704 37602 9,501
080 190 - Mid-Tex Gas Division Addition 080.63704 38000 1,677
080 190 - Mid-Tex Gas Division Addition 080.63705 37602 2,219
080 190 - Mid-Tex Gas Division Addition 080.63712 37602 830
080 190 - Mid-Tex Gas Division Addition 080.63715 37602 1,952
080 190 - Mid-Tex Gas Division Addition 080.63715 38000 103
080 190 - Mid-Tex Gas Division Addition 080.63717 37602 636
080 190 - Mid-Tex Gas Division Addition 080.63717 38000 159
080 190 - Mid-Tex Gas Division Addition 080.63750 37602 349
080 190 - Mid-Tex Gas Division Addition 080.63750 38000 35
080 190 - Mid-Tex Gas Division Addition 080.63751 37602 4,609
080 190 - Mid-Tex Gas Division Addition 080.63751 38000 347
080 190 - Mid-Tex Gas Division Addition 080.63752 37800 102
080 190 - Mid-Tex Gas Division Addition 080.63753 37601 2
080 190 - Mid-Tex Gas Division Addition 080.63753 38000 34
080 190 - Mid-Tex Gas Division Addition 080.63754 37602 119
080 190 - Mid-Tex Gas Division Addition 080.63754 38000 51
080 190 - Mid-Tex Gas Division Addition 080.63768 37800 4
080 190 - Mid-Tex Gas Division Addition 080.63769 37601 2,932
080 190 - Mid-Tex Gas Division Addition 080.63770 37602 6,327
080 190 - Mid-Tex Gas Division Addition 080.63770 38000 626
MTX Additions by FERC
Page 35 of 101
433
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.63772 37800 3
080 190 - Mid-Tex Gas Division Addition 080.63780 37800 7
080 190 - Mid-Tex Gas Division Addition 080.63782 37602 398
080 190 - Mid-Tex Gas Division Addition 080.63783 37602 496
080 190 - Mid-Tex Gas Division Addition 080.63785 37602 606
080 190 - Mid-Tex Gas Division Addition 080.63785 37800 606
080 190 - Mid-Tex Gas Division Addition 080.63788 37602 8,384
080 190 - Mid-Tex Gas Division Addition 080.63788 38000 1,143
080 190 - Mid-Tex Gas Division Addition 080.63790 37602 1,909
080 190 - Mid-Tex Gas Division Addition 080.63810 37602 6,132
080 190 - Mid-Tex Gas Division Addition 080.63831 37602 89,785
080 190 - Mid-Tex Gas Division Addition 080.63831 38000 2,777
080 190 - Mid-Tex Gas Division Addition 080.63850 37602 1,441
080 190 - Mid-Tex Gas Division Addition 080.63850 38000 160
080 190 - Mid-Tex Gas Division Addition 080.63852 37602 3,825
080 190 - Mid-Tex Gas Division Addition 080.63852 38000 425
080 190 - Mid-Tex Gas Division Addition 080.63863 37602 1,404
080 190 - Mid-Tex Gas Division Addition 080.63863 38000 936
080 190 - Mid-Tex Gas Division Addition 080.63877 37602 7,361
080 190 - Mid-Tex Gas Division Addition 080.63877 38000 818
080 190 - Mid-Tex Gas Division Addition 080.63878 37602 4,540
080 190 - Mid-Tex Gas Division Addition 080.63885 37602 1,654
080 190 - Mid-Tex Gas Division Addition 080.63885 37800 709
080 190 - Mid-Tex Gas Division Addition 080.63889 37602 19
080 190 - Mid-Tex Gas Division Addition 080.63901 37602 8,795
080 190 - Mid-Tex Gas Division Addition 080.63901 38000 180
080 190 - Mid-Tex Gas Division Addition 080.63902 37602 1,276
080 190 - Mid-Tex Gas Division Addition 080.63902 38000 547
080 190 - Mid-Tex Gas Division Addition 080.63904 37602 1,472
080 190 - Mid-Tex Gas Division Addition 080.63904 38000 368
080 190 - Mid-Tex Gas Division Addition 080.63906 37602 319
080 190 - Mid-Tex Gas Division Addition 080.63906 38000 35
080 190 - Mid-Tex Gas Division Addition 080.63907 37602 57,582
080 190 - Mid-Tex Gas Division Addition 080.63907 38000 587
080 190 - Mid-Tex Gas Division Addition 080.63911 37602 7,941
080 190 - Mid-Tex Gas Division Addition 080.63911 38000 863
080 190 - Mid-Tex Gas Division Addition 080.63914 37602 2,364
080 190 - Mid-Tex Gas Division Addition 080.63917 37602 1,110
080 190 - Mid-Tex Gas Division Addition 080.63917 38000 84
080 190 - Mid-Tex Gas Division Addition 080.63919 37602 630
080 190 - Mid-Tex Gas Division Addition 080.63919 38000 94
080 190 - Mid-Tex Gas Division Addition 080.63937 37602 261
080 190 - Mid-Tex Gas Division Addition 080.63938 38000 1,319
080 190 - Mid-Tex Gas Division Addition 080.63942 37602 942
080 190 - Mid-Tex Gas Division Addition 080.63942 38000 105
080 190 - Mid-Tex Gas Division Addition 080.63945 37602 448,355
080 190 - Mid-Tex Gas Division Addition 080.63945 37800 616,237
080 190 - Mid-Tex Gas Division Addition 080.63945 38000 56,049
080 190 - Mid-Tex Gas Division Addition 080.63946 37602 2,754
080 190 - Mid-Tex Gas Division Addition 080.63946 38000 489
080 190 - Mid-Tex Gas Division Addition 080.63955 37602 42
080 190 - Mid-Tex Gas Division Addition 080.63955 37800 375
080 190 - Mid-Tex Gas Division Addition 080.63970 37800 1
080 190 - Mid-Tex Gas Division Addition 080.63977 37602 3,074
080 190 - Mid-Tex Gas Division Addition 080.63977 38000 342
080 190 - Mid-Tex Gas Division Addition 080.63978 37602 1,097
080 190 - Mid-Tex Gas Division Addition 080.63978 38000 58
080 190 - Mid-Tex Gas Division Addition 080.63979 37602 894
080 190 - Mid-Tex Gas Division Addition 080.63995 37602 186
080 190 - Mid-Tex Gas Division Addition 080.63995 38000 744
080 190 - Mid-Tex Gas Division Addition 080.64001 37602 200
080 190 - Mid-Tex Gas Division Addition 080.64003 37602 601
080 190 - Mid-Tex Gas Division Addition 080.64003 38000 67
080 190 - Mid-Tex Gas Division Addition 080.64005 37602 728
080 190 - Mid-Tex Gas Division Addition 080.64016 37602 2,114
080 190 - Mid-Tex Gas Division Addition 080.64016 38000 635
080 190 - Mid-Tex Gas Division Addition 080.64025 37602 121,001
080 190 - Mid-Tex Gas Division Addition 080.64025 38000 25,343
080 190 - Mid-Tex Gas Division Addition 080.64026 37602 2,798
080 190 - Mid-Tex Gas Division Addition 080.64026 38000 243
080 190 - Mid-Tex Gas Division Addition 080.64035 37800 7
080 190 - Mid-Tex Gas Division Addition 080.64049 37602 155,093
080 190 - Mid-Tex Gas Division Addition 080.64049 38000 4,831
080 190 - Mid-Tex Gas Division Addition 080.64051 37602 1,821
080 190 - Mid-Tex Gas Division Addition 080.64053 37602 2,590
080 190 - Mid-Tex Gas Division Addition 080.64053 38000 663
080 190 - Mid-Tex Gas Division Addition 080.64070 37602 45
080 190 - Mid-Tex Gas Division Addition 080.64090 37601 18,262
080 190 - Mid-Tex Gas Division Addition 080.64090 37602 106,965
080 190 - Mid-Tex Gas Division Addition 080.64090 38000 5,218
080 190 - Mid-Tex Gas Division Addition 080.64103 37602 (18)
080 190 - Mid-Tex Gas Division Addition 080.64115 38000 219
080 190 - Mid-Tex Gas Division Addition 080.64118 37800 231
080 190 - Mid-Tex Gas Division Addition 080.64122 37602 2,765
080 190 - Mid-Tex Gas Division Addition 080.64128 37602 1,634
080 190 - Mid-Tex Gas Division Addition 080.64128 38000 409
080 190 - Mid-Tex Gas Division Addition 080.64130 37602 156,990
080 190 - Mid-Tex Gas Division Addition 080.64130 38000 17,443
080 190 - Mid-Tex Gas Division Addition 080.64131 37602 129,128
080 190 - Mid-Tex Gas Division Addition 080.64131 38000 21,021
080 190 - Mid-Tex Gas Division Addition 080.64132 37602 11,263
080 190 - Mid-Tex Gas Division Addition 080.64132 38000 1,252
080 190 - Mid-Tex Gas Division Addition 080.64138 37602 115
080 190 - Mid-Tex Gas Division Addition 080.64138 38000 20
080 190 - Mid-Tex Gas Division Addition 080.64139 37602 48,597
080 190 - Mid-Tex Gas Division Addition 080.64141 37602 34,839
080 190 - Mid-Tex Gas Division Addition 080.64141 38000 1,836
080 190 - Mid-Tex Gas Division Addition 080.64144 37602 238
080 190 - Mid-Tex Gas Division Addition 080.64144 38000 59
080 190 - Mid-Tex Gas Division Addition 080.64146 37602 1,366
080 190 - Mid-Tex Gas Division Addition 080.64150 37602 21,054
080 190 - Mid-Tex Gas Division Addition 080.64150 38000 2,338
080 190 - Mid-Tex Gas Division Addition 080.64152 37800 7
080 190 - Mid-Tex Gas Division Addition 080.64154 37602 12,988
080 190 - Mid-Tex Gas Division Addition 080.64155 37602 3,794
080 190 - Mid-Tex Gas Division Addition 080.64157 37602 39,550
080 190 - Mid-Tex Gas Division Addition 080.64158 37602 43,927
MTX Additions by FERC
Page 36 of 101
434
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.64159 37602 55,446
080 190 - Mid-Tex Gas Division Addition 080.64163 37602 4,419
080 190 - Mid-Tex Gas Division Addition 080.64163 38000 1,132
080 190 - Mid-Tex Gas Division Addition 080.64168 37800 0
080 190 - Mid-Tex Gas Division Addition 080.64173 37602 95
080 190 - Mid-Tex Gas Division Addition 080.64173 38000 11
080 190 - Mid-Tex Gas Division Addition 080.64175 37602 6,563
080 190 - Mid-Tex Gas Division Addition 080.64175 38000 1,250
080 190 - Mid-Tex Gas Division Addition 080.64185 37602 8,660
080 190 - Mid-Tex Gas Division Addition 080.64186 37602 7,576
080 190 - Mid-Tex Gas Division Addition 080.64193 37800 7
080 190 - Mid-Tex Gas Division Addition 080.64198 37602 1,554
080 190 - Mid-Tex Gas Division Addition 080.64198 38000 274
080 190 - Mid-Tex Gas Division Addition 080.64202 37602 4,409
080 190 - Mid-Tex Gas Division Addition 080.64202 38000 6,614
080 190 - Mid-Tex Gas Division Addition 080.64216 37602 18,943
080 190 - Mid-Tex Gas Division Addition 080.64216 38000 789
080 190 - Mid-Tex Gas Division Addition 080.64234 37602 9,923
080 190 - Mid-Tex Gas Division Addition 080.64247 37602 1,389
080 190 - Mid-Tex Gas Division Addition 080.64247 38000 73
080 190 - Mid-Tex Gas Division Addition 080.64248 37602 883
080 190 - Mid-Tex Gas Division Addition 080.64249 37602 447
080 190 - Mid-Tex Gas Division Addition 080.64249 38000 24
080 190 - Mid-Tex Gas Division Addition 080.64254 38000 947
080 190 - Mid-Tex Gas Division Addition 080.64274 37602 445
080 190 - Mid-Tex Gas Division Addition 080.64295 37602 663
080 190 - Mid-Tex Gas Division Addition 080.64295 37800 589
080 190 - Mid-Tex Gas Division Addition 080.64302 37800 1
080 190 - Mid-Tex Gas Division Addition 080.64303 37602 931
080 190 - Mid-Tex Gas Division Addition 080.64303 38000 19
080 190 - Mid-Tex Gas Division Addition 080.64305 37800 350
080 190 - Mid-Tex Gas Division Addition 080.64309 37800 1
080 190 - Mid-Tex Gas Division Addition 080.64312 37602 1,041
080 190 - Mid-Tex Gas Division Addition 080.64317 37602 1,963
080 190 - Mid-Tex Gas Division Addition 080.64319 37602 1,134
080 190 - Mid-Tex Gas Division Addition 080.64322 37602 247
080 190 - Mid-Tex Gas Division Addition 080.64323 37601 (0)
080 190 - Mid-Tex Gas Division Addition 080.64323 37602 (2)
080 190 - Mid-Tex Gas Division Addition 080.64323 37800 (9)
080 190 - Mid-Tex Gas Division Addition 080.64326 37602 32,803
080 190 - Mid-Tex Gas Division Addition 080.64326 38000 2,859
080 190 - Mid-Tex Gas Division Addition 080.64328 37602 959
080 190 - Mid-Tex Gas Division Addition 080.64328 38000 107
080 190 - Mid-Tex Gas Division Addition 080.64330 38000 18,264
080 190 - Mid-Tex Gas Division Addition 080.64339 37602 433
080 190 - Mid-Tex Gas Division Addition 080.64341 37602 1,139
080 190 - Mid-Tex Gas Division Addition 080.64342 37602 703
080 190 - Mid-Tex Gas Division Addition 080.64342 38000 234
080 190 - Mid-Tex Gas Division Addition 080.64346 37602 84,386
080 190 - Mid-Tex Gas Division Addition 080.64346 38000 (10,705)
080 190 - Mid-Tex Gas Division Addition 080.64366 37601 7,532
080 190 - Mid-Tex Gas Division Addition 080.64366 37602 88,883
080 190 - Mid-Tex Gas Division Addition 080.64366 37800 45,195
080 190 - Mid-Tex Gas Division Addition 080.64366 38000 9,039
080 190 - Mid-Tex Gas Division Addition 080.64376 38000 885
080 190 - Mid-Tex Gas Division Addition 080.64378 37602 (41)
080 190 - Mid-Tex Gas Division Addition 080.64380 37602 333
080 190 - Mid-Tex Gas Division Addition 080.64393 37602 1,827
080 190 - Mid-Tex Gas Division Addition 080.64393 38000 370
080 190 - Mid-Tex Gas Division Addition 080.64395 37602 2,183
080 190 - Mid-Tex Gas Division Addition 080.64395 38000 45
080 190 - Mid-Tex Gas Division Addition 080.64398 37602 30,102
080 190 - Mid-Tex Gas Division Addition 080.64398 38000 1,584
080 190 - Mid-Tex Gas Division Addition 080.64399 37602 973
080 190 - Mid-Tex Gas Division Addition 080.64399 38000 108
080 190 - Mid-Tex Gas Division Addition 080.64400 37602 6,647
080 190 - Mid-Tex Gas Division Addition 080.64400 38000 350
080 190 - Mid-Tex Gas Division Addition 080.64407 37602 36
080 190 - Mid-Tex Gas Division Addition 080.64407 37800 857
080 190 - Mid-Tex Gas Division Addition 080.64410 37601 166
080 190 - Mid-Tex Gas Division Addition 080.64410 38000 4
080 190 - Mid-Tex Gas Division Addition 080.64412 37602 -
080 190 - Mid-Tex Gas Division Addition 080.64414 37601 9,927
080 190 - Mid-Tex Gas Division Addition 080.64416 37602 283
080 190 - Mid-Tex Gas Division Addition 080.64416 37800 525
080 190 - Mid-Tex Gas Division Addition 080.64420 37602 1,234
080 190 - Mid-Tex Gas Division Addition 080.64422 37800 7
080 190 - Mid-Tex Gas Division Addition 080.64423 37800 7
080 190 - Mid-Tex Gas Division Addition 080.64424 37602 1,507
080 190 - Mid-Tex Gas Division Addition 080.64431 37602 3,608
080 190 - Mid-Tex Gas Division Addition 080.64434 38000 2,201
080 190 - Mid-Tex Gas Division Addition 080.64438 37602 37,864
080 190 - Mid-Tex Gas Division Addition 080.64438 38000 4,208
080 190 - Mid-Tex Gas Division Addition 080.64440 37602 262
080 190 - Mid-Tex Gas Division Addition 080.64442 37602 27,341
080 190 - Mid-Tex Gas Division Addition 080.64442 38000 7,712
080 190 - Mid-Tex Gas Division Addition 080.64451 37602 8,920
080 190 - Mid-Tex Gas Division Addition 080.64451 38000 90
080 190 - Mid-Tex Gas Division Addition 080.64467 37602 3,675
080 190 - Mid-Tex Gas Division Addition 080.64467 38000 681
080 190 - Mid-Tex Gas Division Addition 080.64471 37602 4,890
080 190 - Mid-Tex Gas Division Addition 080.64471 38000 550
080 190 - Mid-Tex Gas Division Addition 080.64472 37800 234
080 190 - Mid-Tex Gas Division Addition 080.64474 37800 (8)
080 190 - Mid-Tex Gas Division Addition 080.64487 37602 6,156
080 190 - Mid-Tex Gas Division Addition 080.64487 38000 324
080 190 - Mid-Tex Gas Division Addition 080.64491 37800 1,100
080 190 - Mid-Tex Gas Division Addition 080.64493 37602 406
080 190 - Mid-Tex Gas Division Addition 080.64494 37602 50,673
080 190 - Mid-Tex Gas Division Addition 080.64495 38000 3,240
080 190 - Mid-Tex Gas Division Addition 080.64500 37601 2,533,707
080 190 - Mid-Tex Gas Division Addition 080.64500 37602 1,674,823
080 190 - Mid-Tex Gas Division Addition 080.64500 37800 85,889
080 190 - Mid-Tex Gas Division Addition 080.64506 37602 55
080 190 - Mid-Tex Gas Division Addition 080.64506 38000 9
080 190 - Mid-Tex Gas Division Addition 080.64517 37602 2,545
080 190 - Mid-Tex Gas Division Addition 080.64517 37800 159
MTX Additions by FERC
Page 37 of 101
435
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.64517 38000 477
080 190 - Mid-Tex Gas Division Addition 080.64518 37800 0
080 190 - Mid-Tex Gas Division Addition 080.64519 37602 878
080 190 - Mid-Tex Gas Division Addition 080.64519 38000 98
080 190 - Mid-Tex Gas Division Addition 080.64522 37602 40,124
080 190 - Mid-Tex Gas Division Addition 080.64522 38000 1,973
080 190 - Mid-Tex Gas Division Addition 080.64527 37602 510
080 190 - Mid-Tex Gas Division Addition 080.64531 37602 (407,323)
080 190 - Mid-Tex Gas Division Addition 080.64531 38000 (12,598)
080 190 - Mid-Tex Gas Division Addition 080.64540 37601 107,280
080 190 - Mid-Tex Gas Division Addition 080.64540 37800 3,699
080 190 - Mid-Tex Gas Division Addition 080.64541 37601 63,197
080 190 - Mid-Tex Gas Division Addition 080.64541 37800 21,066
080 190 - Mid-Tex Gas Division Addition 080.64546 37602 35,126
080 190 - Mid-Tex Gas Division Addition 080.64546 38000 1,086
080 190 - Mid-Tex Gas Division Addition 080.64551 37800 2,574
080 190 - Mid-Tex Gas Division Addition 080.64553 37601 994
080 190 - Mid-Tex Gas Division Addition 080.64556 37602 1,665
080 190 - Mid-Tex Gas Division Addition 080.64556 38000 165
080 190 - Mid-Tex Gas Division Addition 080.64557 37602 512
080 190 - Mid-Tex Gas Division Addition 080.64558 37602 7,424
080 190 - Mid-Tex Gas Division Addition 080.64558 38000 2,475
080 190 - Mid-Tex Gas Division Addition 080.64559 37602 1,491
080 190 - Mid-Tex Gas Division Addition 080.64559 38000 78
080 190 - Mid-Tex Gas Division Addition 080.64569 37602 40,188
080 190 - Mid-Tex Gas Division Addition 080.64569 38000 4,475
080 190 - Mid-Tex Gas Division Addition 080.64571 37602 1,668
080 190 - Mid-Tex Gas Division Addition 080.64571 38000 52
080 190 - Mid-Tex Gas Division Addition 080.64572 37602 30,268
080 190 - Mid-Tex Gas Division Addition 080.64572 38000 2,596
080 190 - Mid-Tex Gas Division Addition 080.64576 37602 272
080 190 - Mid-Tex Gas Division Addition 080.64579 37602 6,299
080 190 - Mid-Tex Gas Division Addition 080.64579 38000 474
080 190 - Mid-Tex Gas Division Addition 080.64583 37601 6,883
080 190 - Mid-Tex Gas Division Addition 080.64583 37800 142
080 190 - Mid-Tex Gas Division Addition 080.64584 37602 55,044
080 190 - Mid-Tex Gas Division Addition 080.64584 38000 2,897
080 190 - Mid-Tex Gas Division Addition 080.64589 37602 39,330
080 190 - Mid-Tex Gas Division Addition 080.64589 38000 4,370
080 190 - Mid-Tex Gas Division Addition 080.64593 37602 13,930
080 190 - Mid-Tex Gas Division Addition 080.64594 37602 11,084
080 190 - Mid-Tex Gas Division Addition 080.64594 38000 3,695
080 190 - Mid-Tex Gas Division Addition 080.64599 37602 40,511
080 190 - Mid-Tex Gas Division Addition 080.64601 37602 9,932
080 190 - Mid-Tex Gas Division Addition 080.64601 38000 1,917
080 190 - Mid-Tex Gas Division Addition 080.64603 37800 44
080 190 - Mid-Tex Gas Division Addition 080.64604 37601 5,092
080 190 - Mid-Tex Gas Division Addition 080.64604 37800 2,182
080 190 - Mid-Tex Gas Division Addition 080.64606 37800 18
080 190 - Mid-Tex Gas Division Addition 080.64608 37602 57,608
080 190 - Mid-Tex Gas Division Addition 080.64612 37601 1,906
080 190 - Mid-Tex Gas Division Addition 080.64612 38000 59
080 190 - Mid-Tex Gas Division Addition 080.64614 37602 218
080 190 - Mid-Tex Gas Division Addition 080.64629 37602 (580)
080 190 - Mid-Tex Gas Division Addition 080.64630 37602 329
080 190 - Mid-Tex Gas Division Addition 080.64630 38000 17
080 190 - Mid-Tex Gas Division Addition 080.64632 37602 626
080 190 - Mid-Tex Gas Division Addition 080.64633 37602 659
080 190 - Mid-Tex Gas Division Addition 080.64633 38000 116
080 190 - Mid-Tex Gas Division Addition 080.64640 37602 9
080 190 - Mid-Tex Gas Division Addition 080.64647 37602 428
080 190 - Mid-Tex Gas Division Addition 080.64650 37602 886
080 190 - Mid-Tex Gas Division Addition 080.64654 37602 618
080 190 - Mid-Tex Gas Division Addition 080.64654 38000 69
080 190 - Mid-Tex Gas Division Addition 080.64660 37601 6
080 190 - Mid-Tex Gas Division Addition 080.64661 37602 7,073
080 190 - Mid-Tex Gas Division Addition 080.64661 38000 928
080 190 - Mid-Tex Gas Division Addition 080.64662 37602 649
080 190 - Mid-Tex Gas Division Addition 080.64669 37602 829
080 190 - Mid-Tex Gas Division Addition 080.64669 38000 35
080 190 - Mid-Tex Gas Division Addition 080.64680 37602 666
080 190 - Mid-Tex Gas Division Addition 080.64680 38000 234
080 190 - Mid-Tex Gas Division Addition 080.64685 37602 1,176
080 190 - Mid-Tex Gas Division Addition 080.64685 38000 38
080 190 - Mid-Tex Gas Division Addition 080.64688 37602 3,602
080 190 - Mid-Tex Gas Division Addition 080.64688 38000 314
080 190 - Mid-Tex Gas Division Addition 080.64689 37602 581
080 190 - Mid-Tex Gas Division Addition 080.64689 38000 65
080 190 - Mid-Tex Gas Division Addition 080.64691 37602 816
080 190 - Mid-Tex Gas Division Addition 080.64691 38000 91
080 190 - Mid-Tex Gas Division Addition 080.64692 37602 916
080 190 - Mid-Tex Gas Division Addition 080.64692 38000 229
080 190 - Mid-Tex Gas Division Addition 080.64699 37602 394
080 190 - Mid-Tex Gas Division Addition 080.64699 38000 21
080 190 - Mid-Tex Gas Division Addition 080.64703 37602 76,751
080 190 - Mid-Tex Gas Division Addition 080.64703 38000 8,273
080 190 - Mid-Tex Gas Division Addition 080.64712 37800 152
080 190 - Mid-Tex Gas Division Addition 080.64713 37800 8
080 190 - Mid-Tex Gas Division Addition 080.64717 37602 649
080 190 - Mid-Tex Gas Division Addition 080.64719 37602 4,018
080 190 - Mid-Tex Gas Division Addition 080.64719 38000 145
080 190 - Mid-Tex Gas Division Addition 080.64722 37601 3,802
080 190 - Mid-Tex Gas Division Addition 080.64724 37602 99,141
080 190 - Mid-Tex Gas Division Addition 080.64724 38000 5,218
080 190 - Mid-Tex Gas Division Addition 080.64730 37602 1,115
080 190 - Mid-Tex Gas Division Addition 080.64735 37602 802
080 190 - Mid-Tex Gas Division Addition 080.64735 38000 201
080 190 - Mid-Tex Gas Division Addition 080.64739 37800 4,502
080 190 - Mid-Tex Gas Division Addition 080.64740 37602 12,039
080 190 - Mid-Tex Gas Division Addition 080.64740 38000 231
080 190 - Mid-Tex Gas Division Addition 080.64741 37602 799
080 190 - Mid-Tex Gas Division Addition 080.64741 38000 42
080 190 - Mid-Tex Gas Division Addition 080.64750 37602 15,614
080 190 - Mid-Tex Gas Division Addition 080.64750 38000 3,902
080 190 - Mid-Tex Gas Division Addition 080.64769 37602 287
080 190 - Mid-Tex Gas Division Addition 080.64770 37602 1,182
080 190 - Mid-Tex Gas Division Addition 080.64770 38000 62
MTX Additions by FERC
Page 38 of 101
436
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.64775 37602 928
080 190 - Mid-Tex Gas Division Addition 080.64775 38000 49
080 190 - Mid-Tex Gas Division Addition 080.64776 37602 1,115
080 190 - Mid-Tex Gas Division Addition 080.64776 38000 197
080 190 - Mid-Tex Gas Division Addition 080.64781 37601 280
080 190 - Mid-Tex Gas Division Addition 080.64781 37602 4,475
080 190 - Mid-Tex Gas Division Addition 080.64781 38000 839
080 190 - Mid-Tex Gas Division Addition 080.64784 37602 1,837
080 190 - Mid-Tex Gas Division Addition 080.64799 37800 9
080 190 - Mid-Tex Gas Division Addition 080.64810 37602 3,873
080 190 - Mid-Tex Gas Division Addition 080.64810 38000 579
080 190 - Mid-Tex Gas Division Addition 080.64825 37601 282,040
080 190 - Mid-Tex Gas Division Addition 080.64825 37800 11,752
080 190 - Mid-Tex Gas Division Addition 080.64826 37602 14,516
080 190 - Mid-Tex Gas Division Addition 080.64826 38000 449
080 190 - Mid-Tex Gas Division Addition 080.64827 37800 575
080 190 - Mid-Tex Gas Division Addition 080.64830 37602 421
080 190 - Mid-Tex Gas Division Addition 080.64834 37602 8,783
080 190 - Mid-Tex Gas Division Addition 080.64834 38000 1,290
080 190 - Mid-Tex Gas Division Addition 080.64838 37601 8,973
080 190 - Mid-Tex Gas Division Addition 080.64843 37602 659
080 190 - Mid-Tex Gas Division Addition 080.64843 38000 20
080 190 - Mid-Tex Gas Division Addition 080.64850 37800 2,917
080 190 - Mid-Tex Gas Division Addition 080.64874 37602 774
080 190 - Mid-Tex Gas Division Addition 080.64876 37602 8,156
080 190 - Mid-Tex Gas Division Addition 080.64876 38000 709
080 190 - Mid-Tex Gas Division Addition 080.64880 37601 19,712
080 190 - Mid-Tex Gas Division Addition 080.64895 37602 113
080 190 - Mid-Tex Gas Division Addition 080.64896 37602 5,095
080 190 - Mid-Tex Gas Division Addition 080.64896 38000 899
080 190 - Mid-Tex Gas Division Addition 080.64898 37602 -
080 190 - Mid-Tex Gas Division Addition 080.64904 37602 1,250
080 190 - Mid-Tex Gas Division Addition 080.64904 38000 313
080 190 - Mid-Tex Gas Division Addition 080.64905 37601 546,644
080 190 - Mid-Tex Gas Division Addition 080.64905 37602 342,692
080 190 - Mid-Tex Gas Division Addition 080.64905 37800 60,902
080 190 - Mid-Tex Gas Division Addition 080.64905 38000 9,791
080 190 - Mid-Tex Gas Division Addition 080.64927 37602 549
080 190 - Mid-Tex Gas Division Addition 080.64930 37602 3,410
080 190 - Mid-Tex Gas Division Addition 080.64930 38000 379
080 190 - Mid-Tex Gas Division Addition 080.64934 37602 698
080 190 - Mid-Tex Gas Division Addition 080.64934 38000 114
080 190 - Mid-Tex Gas Division Addition 080.64935 37601 (1)
080 190 - Mid-Tex Gas Division Addition 080.64937 37602 11,098
080 190 - Mid-Tex Gas Division Addition 080.64937 38000 2,091
080 190 - Mid-Tex Gas Division Addition 080.64940 37602 295
080 190 - Mid-Tex Gas Division Addition 080.64940 38000 6
080 190 - Mid-Tex Gas Division Addition 080.64943 37602 1,705
080 190 - Mid-Tex Gas Division Addition 080.64943 37800 427
080 190 - Mid-Tex Gas Division Addition 080.64944 37602 150
080 190 - Mid-Tex Gas Division Addition 080.64946 37800 2
080 190 - Mid-Tex Gas Division Addition 080.64947 37800 1,956
080 190 - Mid-Tex Gas Division Addition 080.64956 37602 (284,202)
080 190 - Mid-Tex Gas Division Addition 080.64959 37800 (1)
080 190 - Mid-Tex Gas Division Addition 080.64965 37602 953
080 190 - Mid-Tex Gas Division Addition 080.64965 38000 157
080 190 - Mid-Tex Gas Division Addition 080.64966 37602 4,831
080 190 - Mid-Tex Gas Division Addition 080.64966 38000 2,070
080 190 - Mid-Tex Gas Division Addition 080.64967 37602 201
080 190 - Mid-Tex Gas Division Addition 080.64967 38000 144
080 190 - Mid-Tex Gas Division Addition 080.64968 37602 586
080 190 - Mid-Tex Gas Division Addition 080.64968 38000 147
080 190 - Mid-Tex Gas Division Addition 080.64969 37602 5,386
080 190 - Mid-Tex Gas Division Addition 080.64969 38000 950
080 190 - Mid-Tex Gas Division Addition 080.64979 37800 13
080 190 - Mid-Tex Gas Division Addition 080.64983 37602 1,356
080 190 - Mid-Tex Gas Division Addition 080.64983 37800 904
080 190 - Mid-Tex Gas Division Addition 080.64985 37800 5,189
080 190 - Mid-Tex Gas Division Addition 080.64995 37601 257
080 190 - Mid-Tex Gas Division Addition 080.65005 37602 4,231
080 190 - Mid-Tex Gas Division Addition 080.65005 38000 223
080 190 - Mid-Tex Gas Division Addition 080.65008 37602 72,888
080 190 - Mid-Tex Gas Division Addition 080.65008 38000 3,836
080 190 - Mid-Tex Gas Division Addition 080.65015 37602 1,988
080 190 - Mid-Tex Gas Division Addition 080.65015 38000 221
080 190 - Mid-Tex Gas Division Addition 080.65021 37602 796
080 190 - Mid-Tex Gas Division Addition 080.65021 38000 42
080 190 - Mid-Tex Gas Division Addition 080.65027 37800 116
080 190 - Mid-Tex Gas Division Addition 080.65030 37601 164
080 190 - Mid-Tex Gas Division Addition 080.65032 37602 722
080 190 - Mid-Tex Gas Division Addition 080.65037 37602 2,258
080 190 - Mid-Tex Gas Division Addition 080.65037 38000 565
080 190 - Mid-Tex Gas Division Addition 080.65038 37602 247
080 190 - Mid-Tex Gas Division Addition 080.65038 38000 3
080 190 - Mid-Tex Gas Division Addition 080.65049 38000 1,837
080 190 - Mid-Tex Gas Division Addition 080.65061 37602 1,800
080 190 - Mid-Tex Gas Division Addition 080.65061 38000 95
080 190 - Mid-Tex Gas Division Addition 080.65066 37602 388
080 190 - Mid-Tex Gas Division Addition 080.65082 37602 1,492
080 190 - Mid-Tex Gas Division Addition 080.65082 38000 130
080 190 - Mid-Tex Gas Division Addition 080.65103 37601 3,751,202
080 190 - Mid-Tex Gas Division Addition 080.65103 37602 176,643
080 190 - Mid-Tex Gas Division Addition 080.65103 37800 463,694
080 190 - Mid-Tex Gas Division Addition 080.65117 37602 10,640
080 190 - Mid-Tex Gas Division Addition 080.65124 37601 1,180
080 190 - Mid-Tex Gas Division Addition 080.65124 37800 3,256
080 190 - Mid-Tex Gas Division Addition 080.65125 37602 32,903
080 190 - Mid-Tex Gas Division Addition 080.65131 37601 886
080 190 - Mid-Tex Gas Division Addition 080.65136 37602 1,286
080 190 - Mid-Tex Gas Division Addition 080.65136 38000 68
080 190 - Mid-Tex Gas Division Addition 080.65140 37800 1,638
080 190 - Mid-Tex Gas Division Addition 080.65141 37602 1,940
080 190 - Mid-Tex Gas Division Addition 080.65141 38000 169
080 190 - Mid-Tex Gas Division Addition 080.65144 37602 73,372
080 190 - Mid-Tex Gas Division Addition 080.65144 38000 10,972
080 190 - Mid-Tex Gas Division Addition 080.65145 37601 (4)
080 190 - Mid-Tex Gas Division Addition 080.65145 37602 (3)
MTX Additions by FERC
Page 39 of 101
437
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.65146 37602 2,011
080 190 - Mid-Tex Gas Division Addition 080.65146 38000 106
080 190 - Mid-Tex Gas Division Addition 080.65156 37602 11,945
080 190 - Mid-Tex Gas Division Addition 080.65156 38000 629
080 190 - Mid-Tex Gas Division Addition 080.65158 37602 580
080 190 - Mid-Tex Gas Division Addition 080.65158 38000 145
080 190 - Mid-Tex Gas Division Addition 080.65159 37600 321
080 190 - Mid-Tex Gas Division Addition 080.65159 37602 2,249
080 190 - Mid-Tex Gas Division Addition 080.65159 38000 642
080 190 - Mid-Tex Gas Division Addition 080.65161 37602 1,520
080 190 - Mid-Tex Gas Division Addition 080.65166 37601 5,389
080 190 - Mid-Tex Gas Division Addition 080.65166 37800 12,719
080 190 - Mid-Tex Gas Division Addition 080.65168 38000 21,600
080 190 - Mid-Tex Gas Division Addition 080.65169 37602 17,492
080 190 - Mid-Tex Gas Division Addition 080.65180 37602 82,696
080 190 - Mid-Tex Gas Division Addition 080.65180 38000 15,752
080 190 - Mid-Tex Gas Division Addition 080.65204 37602 6,454
080 190 - Mid-Tex Gas Division Addition 080.65204 38000 1,613
080 190 - Mid-Tex Gas Division Addition 080.65215 37602 829
080 190 - Mid-Tex Gas Division Addition 080.65215 38000 26
080 190 - Mid-Tex Gas Division Addition 080.65223 37602 496
080 190 - Mid-Tex Gas Division Addition 080.65223 38000 165
080 190 - Mid-Tex Gas Division Addition 080.65229 37602 285
080 190 - Mid-Tex Gas Division Addition 080.65242 38000 12,909
080 190 - Mid-Tex Gas Division Addition 080.65247 37602 348
080 190 - Mid-Tex Gas Division Addition 080.65247 38000 18
080 190 - Mid-Tex Gas Division Addition 080.65250 37602 19,333
080 190 - Mid-Tex Gas Division Addition 080.65250 38000 1,681
080 190 - Mid-Tex Gas Division Addition 080.65258 37602 61,173
080 190 - Mid-Tex Gas Division Addition 080.65258 38000 10,795
080 190 - Mid-Tex Gas Division Addition 080.65264 37602 5,098
080 190 - Mid-Tex Gas Division Addition 080.65264 38000 568
080 190 - Mid-Tex Gas Division Addition 080.65269 37602 599
080 190 - Mid-Tex Gas Division Addition 080.65269 38000 67
080 190 - Mid-Tex Gas Division Addition 080.65274 37602 2,110
080 190 - Mid-Tex Gas Division Addition 080.65274 38000 111
080 190 - Mid-Tex Gas Division Addition 080.65275 37602 46,856
080 190 - Mid-Tex Gas Division Addition 080.65275 38000 5,206
080 190 - Mid-Tex Gas Division Addition 080.65287 37602 2,068
080 190 - Mid-Tex Gas Division Addition 080.65287 38000 3,102
080 190 - Mid-Tex Gas Division Addition 080.65294 37601 (48,635)
080 190 - Mid-Tex Gas Division Addition 080.65296 37602 605
080 190 - Mid-Tex Gas Division Addition 080.65296 38000 32
080 190 - Mid-Tex Gas Division Addition 080.65299 37602 13,201
080 190 - Mid-Tex Gas Division Addition 080.65301 37602 1,656
080 190 - Mid-Tex Gas Division Addition 080.65301 38000 185
080 190 - Mid-Tex Gas Division Addition 080.65302 37602 819
080 190 - Mid-Tex Gas Division Addition 080.65302 38000 91
080 190 - Mid-Tex Gas Division Addition 080.65305 37602 7,344
080 190 - Mid-Tex Gas Division Addition 080.65306 37602 1,138
080 190 - Mid-Tex Gas Division Addition 080.65306 38000 156
080 190 - Mid-Tex Gas Division Addition 080.65312 37602 451
080 190 - Mid-Tex Gas Division Addition 080.65323 37602 33,556
080 190 - Mid-Tex Gas Division Addition 080.65324 37602 6,027
080 190 - Mid-Tex Gas Division Addition 080.65324 38000 1,064
080 190 - Mid-Tex Gas Division Addition 080.65325 37602 2,749
080 190 - Mid-Tex Gas Division Addition 080.65325 38000 305
080 190 - Mid-Tex Gas Division Addition 080.65326 37602 1,310
080 190 - Mid-Tex Gas Division Addition 080.65326 38000 69
080 190 - Mid-Tex Gas Division Addition 080.65328 37602 495
080 190 - Mid-Tex Gas Division Addition 080.65328 38000 165
080 190 - Mid-Tex Gas Division Addition 080.65329 37602 1,516
080 190 - Mid-Tex Gas Division Addition 080.65329 38000 379
080 190 - Mid-Tex Gas Division Addition 080.65332 37602 90,286
080 190 - Mid-Tex Gas Division Addition 080.65333 37602 (788)
080 190 - Mid-Tex Gas Division Addition 080.65334 37602 26,185
080 190 - Mid-Tex Gas Division Addition 080.65339 37601 (0)
080 190 - Mid-Tex Gas Division Addition 080.65339 37602 (0)
080 190 - Mid-Tex Gas Division Addition 080.65339 38000 -
080 190 - Mid-Tex Gas Division Addition 080.65340 37602 94
080 190 - Mid-Tex Gas Division Addition 080.65341 37601 (7)
080 190 - Mid-Tex Gas Division Addition 080.65341 37602 (18)
080 190 - Mid-Tex Gas Division Addition 080.65343 37601 (16)
080 190 - Mid-Tex Gas Division Addition 080.65343 38000 (1)
080 190 - Mid-Tex Gas Division Addition 080.65344 37602 427
080 190 - Mid-Tex Gas Division Addition 080.65344 38000 93
080 190 - Mid-Tex Gas Division Addition 080.65347 37800 1,253
080 190 - Mid-Tex Gas Division Addition 080.65356 37601 12,907
080 190 - Mid-Tex Gas Division Addition 080.65359 37602 3,133
080 190 - Mid-Tex Gas Division Addition 080.65361 37602 1,114
080 190 - Mid-Tex Gas Division Addition 080.65361 38000 124
080 190 - Mid-Tex Gas Division Addition 080.65364 37602 204
080 190 - Mid-Tex Gas Division Addition 080.65364 38000 36
080 190 - Mid-Tex Gas Division Addition 080.65367 37602 110,737
080 190 - Mid-Tex Gas Division Addition 080.65367 38000 12,304
080 190 - Mid-Tex Gas Division Addition 080.65368 37601 3,052
080 190 - Mid-Tex Gas Division Addition 080.65368 37602 1,045
080 190 - Mid-Tex Gas Division Addition 080.65368 37800 210
080 190 - Mid-Tex Gas Division Addition 080.65368 38000 149
080 190 - Mid-Tex Gas Division Addition 080.65371 37602 20,167
080 190 - Mid-Tex Gas Division Addition 080.65371 38000 1,061
080 190 - Mid-Tex Gas Division Addition 080.65374 37602 803
080 190 - Mid-Tex Gas Division Addition 080.65380 37800 18
080 190 - Mid-Tex Gas Division Addition 080.65384 37602 4,295
080 190 - Mid-Tex Gas Division Addition 080.65384 38000 699
080 190 - Mid-Tex Gas Division Addition 080.65386 37600 4,945
080 190 - Mid-Tex Gas Division Addition 080.65390 38000 4,482
080 190 - Mid-Tex Gas Division Addition 080.65407 37800 10
080 190 - Mid-Tex Gas Division Addition 080.65415 37602 318
080 190 - Mid-Tex Gas Division Addition 080.65418 37602 28,041
080 190 - Mid-Tex Gas Division Addition 080.65421 37600 409
080 190 - Mid-Tex Gas Division Addition 080.65431 37602 3,879
080 190 - Mid-Tex Gas Division Addition 080.65431 38000 2,586
080 190 - Mid-Tex Gas Division Addition 080.65436 37601 (10)
080 190 - Mid-Tex Gas Division Addition 080.65437 37602 29,440
080 190 - Mid-Tex Gas Division Addition 080.65437 38000 5,195
080 190 - Mid-Tex Gas Division Addition 080.65443 37602 157,367
MTX Additions by FERC
Page 40 of 101
438
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.65443 38000 20,449
080 190 - Mid-Tex Gas Division Addition 080.65444 37602 2,244
080 190 - Mid-Tex Gas Division Addition 080.65446 37602 983
080 190 - Mid-Tex Gas Division Addition 080.65446 38000 52
080 190 - Mid-Tex Gas Division Addition 080.65451 37602 399
080 190 - Mid-Tex Gas Division Addition 080.65451 38000 133
080 190 - Mid-Tex Gas Division Addition 080.65457 37602 9,588
080 190 - Mid-Tex Gas Division Addition 080.65461 37602 673
080 190 - Mid-Tex Gas Division Addition 080.65461 38000 67
080 190 - Mid-Tex Gas Division Addition 080.65462 37602 4,413
080 190 - Mid-Tex Gas Division Addition 080.65462 38000 282
080 190 - Mid-Tex Gas Division Addition 080.65473 37602 -
080 190 - Mid-Tex Gas Division Addition 080.65485 37602 3,105
080 190 - Mid-Tex Gas Division Addition 080.65485 38000 1,207
080 190 - Mid-Tex Gas Division Addition 080.65486 37602 85,956
080 190 - Mid-Tex Gas Division Addition 080.65486 38000 21,488
080 190 - Mid-Tex Gas Division Addition 080.65488 37601 0
080 190 - Mid-Tex Gas Division Addition 080.65488 37602 1
080 190 - Mid-Tex Gas Division Addition 080.65488 37800 23
080 190 - Mid-Tex Gas Division Addition 080.65496 37800 (5)
080 190 - Mid-Tex Gas Division Addition 080.65498 37602 26,703
080 190 - Mid-Tex Gas Division Addition 080.65498 38000 554
080 190 - Mid-Tex Gas Division Addition 080.65502 37602 20,391
080 190 - Mid-Tex Gas Division Addition 080.65502 37800 29,301
080 190 - Mid-Tex Gas Division Addition 080.65506 37800 111
080 190 - Mid-Tex Gas Division Addition 080.65508 37800 17
080 190 - Mid-Tex Gas Division Addition 080.65510 37602 214
080 190 - Mid-Tex Gas Division Addition 080.65510 38000 11
080 190 - Mid-Tex Gas Division Addition 080.65511 37601 1,532
080 190 - Mid-Tex Gas Division Addition 080.65514 37602 1,436
080 190 - Mid-Tex Gas Division Addition 080.65514 38000 253
080 190 - Mid-Tex Gas Division Addition 080.65515 37602 10,227
080 190 - Mid-Tex Gas Division Addition 080.65515 37800 11,716
080 190 - Mid-Tex Gas Division Addition 080.65516 37602 1,715
080 190 - Mid-Tex Gas Division Addition 080.65516 37800 857
080 190 - Mid-Tex Gas Division Addition 080.65516 38500 1,715
080 190 - Mid-Tex Gas Division Addition 080.65517 37602 4,875
080 190 - Mid-Tex Gas Division Addition 080.65519 37602 7,244
080 190 - Mid-Tex Gas Division Addition 080.65519 37800 14,961
080 190 - Mid-Tex Gas Division Addition 080.65527 37602 66,172
080 190 - Mid-Tex Gas Division Addition 080.65529 37602 1,531
080 190 - Mid-Tex Gas Division Addition 080.65529 37800 6,125
080 190 - Mid-Tex Gas Division Addition 080.65530 37602 7,586
080 190 - Mid-Tex Gas Division Addition 080.65530 37800 11,379
080 190 - Mid-Tex Gas Division Addition 080.65534 37602 89,056
080 190 - Mid-Tex Gas Division Addition 080.65534 38000 29,680
080 190 - Mid-Tex Gas Division Addition 080.65542 37800 174
080 190 - Mid-Tex Gas Division Addition 080.65545 37602 13,346
080 190 - Mid-Tex Gas Division Addition 080.65546 37602 6,411
080 190 - Mid-Tex Gas Division Addition 080.65548 37602 241
080 190 - Mid-Tex Gas Division Addition 080.65548 38000 145
080 190 - Mid-Tex Gas Division Addition 080.65551 37601 38
080 190 - Mid-Tex Gas Division Addition 080.65551 37602 3,384
080 190 - Mid-Tex Gas Division Addition 080.65551 38000 380
080 190 - Mid-Tex Gas Division Addition 080.65558 37800 (19,718)
080 190 - Mid-Tex Gas Division Addition 080.65563 37602 533
080 190 - Mid-Tex Gas Division Addition 080.65564 37602 35,298
080 190 - Mid-Tex Gas Division Addition 080.65564 38000 8,830
080 190 - Mid-Tex Gas Division Addition 080.65565 37602 185,769
080 190 - Mid-Tex Gas Division Addition 080.65565 38000 17,225
080 190 - Mid-Tex Gas Division Addition 080.65570 37601 2,200
080 190 - Mid-Tex Gas Division Addition 080.65582 37602 14
080 190 - Mid-Tex Gas Division Addition 080.65588 37800 134
080 190 - Mid-Tex Gas Division Addition 080.65588 38000 21
080 190 - Mid-Tex Gas Division Addition 080.65593 37601 34,468
080 190 - Mid-Tex Gas Division Addition 080.65593 37602 7,051
080 190 - Mid-Tex Gas Division Addition 080.65593 37800 9,723
080 190 - Mid-Tex Gas Division Addition 080.65620 37602 3,848
080 190 - Mid-Tex Gas Division Addition 080.65621 37601 7,390
080 190 - Mid-Tex Gas Division Addition 080.65627 37602 6,635
080 190 - Mid-Tex Gas Division Addition 080.65627 37800 7,583
080 190 - Mid-Tex Gas Division Addition 080.65627 38000 1,580
080 190 - Mid-Tex Gas Division Addition 080.65642 37602 6,173
080 190 - Mid-Tex Gas Division Addition 080.65642 37800 5,051
080 190 - Mid-Tex Gas Division Addition 080.65644 37602 20,165
080 190 - Mid-Tex Gas Division Addition 080.65646 37602 29,339
080 190 - Mid-Tex Gas Division Addition 080.65646 38000 1,544
080 190 - Mid-Tex Gas Division Addition 080.65647 37602 1,882
080 190 - Mid-Tex Gas Division Addition 080.65647 37800 3,765
080 190 - Mid-Tex Gas Division Addition 080.65647 38000 627
080 190 - Mid-Tex Gas Division Addition 080.65651 37602 3,910
080 190 - Mid-Tex Gas Division Addition 080.65651 37800 690
080 190 - Mid-Tex Gas Division Addition 080.65653 37602 3,937
080 190 - Mid-Tex Gas Division Addition 080.65653 37800 5,921
080 190 - Mid-Tex Gas Division Addition 080.65655 37601 642
080 190 - Mid-Tex Gas Division Addition 080.65655 37602 1,444
080 190 - Mid-Tex Gas Division Addition 080.65655 37800 13,963
080 190 - Mid-Tex Gas Division Addition 080.65657 37602 1,147
080 190 - Mid-Tex Gas Division Addition 080.65659 37602 508
080 190 - Mid-Tex Gas Division Addition 080.65660 37602 32
080 190 - Mid-Tex Gas Division Addition 080.65661 37602 54,395
080 190 - Mid-Tex Gas Division Addition 080.65661 38000 31,753
080 190 - Mid-Tex Gas Division Addition 080.65672 37602 704
080 190 - Mid-Tex Gas Division Addition 080.65672 38000 7
080 190 - Mid-Tex Gas Division Addition 080.65673 37602 211
080 190 - Mid-Tex Gas Division Addition 080.65674 37601 49,321
080 190 - Mid-Tex Gas Division Addition 080.65674 37602 98,642
080 190 - Mid-Tex Gas Division Addition 080.65674 37800 98,642
080 190 - Mid-Tex Gas Division Addition 080.65678 37602 7,162
080 190 - Mid-Tex Gas Division Addition 080.65678 37800 298
080 190 - Mid-Tex Gas Division Addition 080.65679 37602 7,613
080 190 - Mid-Tex Gas Division Addition 080.65679 37800 7,897
080 190 - Mid-Tex Gas Division Addition 080.65679 38000 310
080 190 - Mid-Tex Gas Division Addition 080.65681 37601 42,718
080 190 - Mid-Tex Gas Division Addition 080.65681 37602 10,680
080 190 - Mid-Tex Gas Division Addition 080.65682 37800 35
080 190 - Mid-Tex Gas Division Addition 080.65683 37602 648
MTX Additions by FERC
Page 41 of 101
439
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.65683 38000 72
080 190 - Mid-Tex Gas Division Addition 080.65690 37602 4,206
080 190 - Mid-Tex Gas Division Addition 080.65690 37800 3,444
080 190 - Mid-Tex Gas Division Addition 080.65694 37602 2,691
080 190 - Mid-Tex Gas Division Addition 080.65694 38000 55
080 190 - Mid-Tex Gas Division Addition 080.65695 37602 2,892
080 190 - Mid-Tex Gas Division Addition 080.65697 37601 (8,556)
080 190 - Mid-Tex Gas Division Addition 080.65704 37602 282,022
080 190 - Mid-Tex Gas Division Addition 080.65704 37800 188,015
080 190 - Mid-Tex Gas Division Addition 080.65704 38000 24,739
080 190 - Mid-Tex Gas Division Addition 080.65705 37602 193
080 190 - Mid-Tex Gas Division Addition 080.65705 38000 10
080 190 - Mid-Tex Gas Division Addition 080.65706 37602 13,575
080 190 - Mid-Tex Gas Division Addition 080.65707 37601 2,041
080 190 - Mid-Tex Gas Division Addition 080.65707 37602 100,022
080 190 - Mid-Tex Gas Division Addition 080.65731 37602 264
080 190 - Mid-Tex Gas Division Addition 080.65731 38000 3
080 190 - Mid-Tex Gas Division Addition 080.65744 37602 346,968
080 190 - Mid-Tex Gas Division Addition 080.65744 37800 520,381
080 190 - Mid-Tex Gas Division Addition 080.65747 37602 5,997
080 190 - Mid-Tex Gas Division Addition 080.65747 38000 6
080 190 - Mid-Tex Gas Division Addition 080.65749 37602 45,461
080 190 - Mid-Tex Gas Division Addition 080.65749 38000 1,923
080 190 - Mid-Tex Gas Division Addition 080.65754 37602 10,087
080 190 - Mid-Tex Gas Division Addition 080.65754 38000 531
080 190 - Mid-Tex Gas Division Addition 080.65774 37602 409
080 190 - Mid-Tex Gas Division Addition 080.65779 37602 1,736
080 190 - Mid-Tex Gas Division Addition 080.65786 37602 232
080 190 - Mid-Tex Gas Division Addition 080.65787 37602 8,169
080 190 - Mid-Tex Gas Division Addition 080.65795 37602 111,422
080 190 - Mid-Tex Gas Division Addition 080.65795 38000 27,855
080 190 - Mid-Tex Gas Division Addition 080.65802 37602 7,593
080 190 - Mid-Tex Gas Division Addition 080.65802 37800 17,716
080 190 - Mid-Tex Gas Division Addition 080.65803 37601 1,476
080 190 - Mid-Tex Gas Division Addition 080.65803 37602 4,849
080 190 - Mid-Tex Gas Division Addition 080.65803 37800 (27)
080 190 - Mid-Tex Gas Division Addition 080.65804 37602 40,879
080 190 - Mid-Tex Gas Division Addition 080.65804 37800 10,220
080 190 - Mid-Tex Gas Division Addition 080.65805 37602 269,889
080 190 - Mid-Tex Gas Division Addition 080.65805 37800 179,926
080 190 - Mid-Tex Gas Division Addition 080.65806 37800 12,122
080 190 - Mid-Tex Gas Division Addition 080.65807 37602 13,654
080 190 - Mid-Tex Gas Division Addition 080.65807 37800 31,859
080 190 - Mid-Tex Gas Division Addition 080.65810 37800 23,688
080 190 - Mid-Tex Gas Division Addition 080.65812 37800 14,176
080 190 - Mid-Tex Gas Division Addition 080.65813 37602 3,555
080 190 - Mid-Tex Gas Division Addition 080.65813 37800 5,332
080 190 - Mid-Tex Gas Division Addition 080.65815 37602 2,831
080 190 - Mid-Tex Gas Division Addition 080.65815 37800 4,247
080 190 - Mid-Tex Gas Division Addition 080.65815 38000 472
080 190 - Mid-Tex Gas Division Addition 080.65816 37601 518
080 190 - Mid-Tex Gas Division Addition 080.65816 37602 4,142
080 190 - Mid-Tex Gas Division Addition 080.65816 37800 21,226
080 190 - Mid-Tex Gas Division Addition 080.65817 37602 3,192
080 190 - Mid-Tex Gas Division Addition 080.65817 37800 9,577
080 190 - Mid-Tex Gas Division Addition 080.65818 37800 19,858
080 190 - Mid-Tex Gas Division Addition 080.65819 37800 14,340
080 190 - Mid-Tex Gas Division Addition 080.65820 37601 1,377
080 190 - Mid-Tex Gas Division Addition 080.65820 37602 14,458
080 190 - Mid-Tex Gas Division Addition 080.65820 37800 53,012
080 190 - Mid-Tex Gas Division Addition 080.65821 37602 251,328
080 190 - Mid-Tex Gas Division Addition 080.65821 37800 44,352
080 190 - Mid-Tex Gas Division Addition 080.65825 37602 9,691
080 190 - Mid-Tex Gas Division Addition 080.65826 37602 80,961
080 190 - Mid-Tex Gas Division Addition 080.65826 38000 26,987
080 190 - Mid-Tex Gas Division Addition 080.65829 37602 11,755
080 190 - Mid-Tex Gas Division Addition 080.65829 38000 619
080 190 - Mid-Tex Gas Division Addition 080.65830 37602 481
080 190 - Mid-Tex Gas Division Addition 080.65838 37602 2,974
080 190 - Mid-Tex Gas Division Addition 080.65838 38000 1,157
080 190 - Mid-Tex Gas Division Addition 080.65840 37602 -
080 190 - Mid-Tex Gas Division Addition 080.65841 37602 1,220
080 190 - Mid-Tex Gas Division Addition 080.65841 37800 4,880
080 190 - Mid-Tex Gas Division Addition 080.65842 37602 140,648
080 190 - Mid-Tex Gas Division Addition 080.65842 37800 211,197
080 190 - Mid-Tex Gas Division Addition 080.65844 37602 2,533
080 190 - Mid-Tex Gas Division Addition 080.65844 37800 7,599
080 190 - Mid-Tex Gas Division Addition 080.65845 37602 1,488
080 190 - Mid-Tex Gas Division Addition 080.65851 37602 106,327
080 190 - Mid-Tex Gas Division Addition 080.65851 38000 11,814
080 190 - Mid-Tex Gas Division Addition 080.65852 37602 1,605
080 190 - Mid-Tex Gas Division Addition 080.65852 37800 290
080 190 - Mid-Tex Gas Division Addition 080.65853 37800 6,736
080 190 - Mid-Tex Gas Division Addition 080.65854 37800 5,976
080 190 - Mid-Tex Gas Division Addition 080.65857 37602 11,764
080 190 - Mid-Tex Gas Division Addition 080.65857 37800 1,759
080 190 - Mid-Tex Gas Division Addition 080.65858 37602 108,644
080 190 - Mid-Tex Gas Division Addition 080.65858 37800 407,413
080 190 - Mid-Tex Gas Division Addition 080.65858 38000 27,161
080 190 - Mid-Tex Gas Division Addition 080.65859 37602 546
080 190 - Mid-Tex Gas Division Addition 080.65859 38000 6
080 190 - Mid-Tex Gas Division Addition 080.65862 37602 131,327
080 190 - Mid-Tex Gas Division Addition 080.65862 37800 367,716
080 190 - Mid-Tex Gas Division Addition 080.65862 38000 26,265
080 190 - Mid-Tex Gas Division Addition 080.65863 37602 3,517
080 190 - Mid-Tex Gas Division Addition 080.65863 37800 11,773
080 190 - Mid-Tex Gas Division Addition 080.65865 37601 17,505
080 190 - Mid-Tex Gas Division Addition 080.65865 37602 131,291
080 190 - Mid-Tex Gas Division Addition 080.65865 37800 26,258
080 190 - Mid-Tex Gas Division Addition 080.65877 37800 48
080 190 - Mid-Tex Gas Division Addition 080.65879 37602 73,586
080 190 - Mid-Tex Gas Division Addition 080.65879 38000 8,176
080 190 - Mid-Tex Gas Division Addition 080.65885 37601 6,482
080 190 - Mid-Tex Gas Division Addition 080.65885 37602 86,429
080 190 - Mid-Tex Gas Division Addition 080.65885 37800 35,332
080 190 - Mid-Tex Gas Division Addition 080.65887 37602 6,510
080 190 - Mid-Tex Gas Division Addition 080.65887 38000 343
MTX Additions by FERC
Page 42 of 101
440
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.65896 37601 129
080 190 - Mid-Tex Gas Division Addition 080.65896 37800 975
080 190 - Mid-Tex Gas Division Addition 080.65896 38000 101
080 190 - Mid-Tex Gas Division Addition 080.65901 37602 10,362
080 190 - Mid-Tex Gas Division Addition 080.65901 38000 4,335
080 190 - Mid-Tex Gas Division Addition 080.65902 37602 13,090
080 190 - Mid-Tex Gas Division Addition 080.65902 38000 9,059
080 190 - Mid-Tex Gas Division Addition 080.65904 37602 654
080 190 - Mid-Tex Gas Division Addition 080.65910 37602 1,397
080 190 - Mid-Tex Gas Division Addition 080.65910 38000 155
080 190 - Mid-Tex Gas Division Addition 080.65917 37602 358
080 190 - Mid-Tex Gas Division Addition 080.65918 37602 9,553
080 190 - Mid-Tex Gas Division Addition 080.65918 38000 198
080 190 - Mid-Tex Gas Division Addition 080.65919 37602 12,716
080 190 - Mid-Tex Gas Division Addition 080.65921 37602 12,740
080 190 - Mid-Tex Gas Division Addition 080.65921 38000 2,248
080 190 - Mid-Tex Gas Division Addition 080.65930 37602 1,366
080 190 - Mid-Tex Gas Division Addition 080.65930 38000 72
080 190 - Mid-Tex Gas Division Addition 080.65955 37800 215
080 190 - Mid-Tex Gas Division Addition 080.65956 37602 39,040
080 190 - Mid-Tex Gas Division Addition 080.65956 38000 3,395
080 190 - Mid-Tex Gas Division Addition 080.65962 37601 455
080 190 - Mid-Tex Gas Division Addition 080.65968 37602 78,409
080 190 - Mid-Tex Gas Division Addition 080.65973 37602 38,714
080 190 - Mid-Tex Gas Division Addition 080.66000 37602 17,136
080 190 - Mid-Tex Gas Division Addition 080.66002 37602 14,312
080 190 - Mid-Tex Gas Division Addition 080.66007 37602 416
080 190 - Mid-Tex Gas Division Addition 080.66011 37602 1,832
080 190 - Mid-Tex Gas Division Addition 080.66011 38000 96
080 190 - Mid-Tex Gas Division Addition 080.66012 37800 4,770
080 190 - Mid-Tex Gas Division Addition 080.66014 37602 1,776
080 190 - Mid-Tex Gas Division Addition 080.66016 37601 632
080 190 - Mid-Tex Gas Division Addition 080.66017 37602 4,513
080 190 - Mid-Tex Gas Division Addition 080.66017 38000 340
080 190 - Mid-Tex Gas Division Addition 080.66023 37602 1,649
080 190 - Mid-Tex Gas Division Addition 080.66023 38000 87
080 190 - Mid-Tex Gas Division Addition 080.66029 37602 2,509
080 190 - Mid-Tex Gas Division Addition 080.66029 38000 279
080 190 - Mid-Tex Gas Division Addition 080.66030 37602 5,404
080 190 - Mid-Tex Gas Division Addition 080.66030 38000 285
080 190 - Mid-Tex Gas Division Addition 080.66031 37602 1,514
080 190 - Mid-Tex Gas Division Addition 080.66032 37602 5,935
080 190 - Mid-Tex Gas Division Addition 080.66034 37602 19,497
080 190 - Mid-Tex Gas Division Addition 080.66035 37800 1,069
080 190 - Mid-Tex Gas Division Addition 080.66037 37601 13,305
080 190 - Mid-Tex Gas Division Addition 080.66038 37602 3,570
080 190 - Mid-Tex Gas Division Addition 080.66038 38000 188
080 190 - Mid-Tex Gas Division Addition 080.66041 37602 25,676
080 190 - Mid-Tex Gas Division Addition 080.66041 38000 2,853
080 190 - Mid-Tex Gas Division Addition 080.66044 37601 500,164
080 190 - Mid-Tex Gas Division Addition 080.66058 37602 13,147
080 190 - Mid-Tex Gas Division Addition 080.66058 38000 5,636
080 190 - Mid-Tex Gas Division Addition 080.66071 37601 19,039
080 190 - Mid-Tex Gas Division Addition 080.66083 37602 307
080 190 - Mid-Tex Gas Division Addition 080.66107 37602 1,328
080 190 - Mid-Tex Gas Division Addition 080.66107 38000 55
080 190 - Mid-Tex Gas Division Addition 080.66110 37602 28,331
080 190 - Mid-Tex Gas Division Addition 080.66110 38000 28,349
080 190 - Mid-Tex Gas Division Addition 080.66113 37602 36,771
080 190 - Mid-Tex Gas Division Addition 080.66113 38000 9,218
080 190 - Mid-Tex Gas Division Addition 080.66125 37602 3,336
080 190 - Mid-Tex Gas Division Addition 080.66126 37602 -
080 190 - Mid-Tex Gas Division Addition 080.66131 38000 4,650
080 190 - Mid-Tex Gas Division Addition 080.66135 37602 448
080 190 - Mid-Tex Gas Division Addition 080.66135 38000 50
080 190 - Mid-Tex Gas Division Addition 080.66142 37602 772
080 190 - Mid-Tex Gas Division Addition 080.66142 38000 86
080 190 - Mid-Tex Gas Division Addition 080.66155 37602 43,957
080 190 - Mid-Tex Gas Division Addition 080.66157 37602 164
080 190 - Mid-Tex Gas Division Addition 080.66157 38000 9
080 190 - Mid-Tex Gas Division Addition 080.66172 37602 3,026
080 190 - Mid-Tex Gas Division Addition 080.66172 38000 336
080 190 - Mid-Tex Gas Division Addition 080.66179 37602 3,885
080 190 - Mid-Tex Gas Division Addition 080.66181 37602 21,380
080 190 - Mid-Tex Gas Division Addition 080.66181 38000 1,125
080 190 - Mid-Tex Gas Division Addition 080.66186 37800 213
080 190 - Mid-Tex Gas Division Addition 080.66209 37601 53,484
080 190 - Mid-Tex Gas Division Addition 080.66212 37602 13,031
080 190 - Mid-Tex Gas Division Addition 080.66212 37800 13,031
080 190 - Mid-Tex Gas Division Addition 080.66212 38000 1,086
080 190 - Mid-Tex Gas Division Addition 080.66213 37601 3,369
080 190 - Mid-Tex Gas Division Addition 080.66213 37602 3,369
080 190 - Mid-Tex Gas Division Addition 080.66213 37800 9,332
080 190 - Mid-Tex Gas Division Addition 080.66214 37602 3
080 190 - Mid-Tex Gas Division Addition 080.66214 38000 25
080 190 - Mid-Tex Gas Division Addition 080.66216 37602 1,150
080 190 - Mid-Tex Gas Division Addition 080.66216 38000 61
080 190 - Mid-Tex Gas Division Addition 080.66217 37602 336
080 190 - Mid-Tex Gas Division Addition 080.66218 37602 486
080 190 - Mid-Tex Gas Division Addition 080.66223 37602 271
080 190 - Mid-Tex Gas Division Addition 080.66223 38000 14
080 190 - Mid-Tex Gas Division Addition 080.66224 37602 7,776
080 190 - Mid-Tex Gas Division Addition 080.66224 38000 409
080 190 - Mid-Tex Gas Division Addition 080.66229 37602 3,789
080 190 - Mid-Tex Gas Division Addition 080.66233 37601 2,467
080 190 - Mid-Tex Gas Division Addition 080.66238 37602 243
080 190 - Mid-Tex Gas Division Addition 080.66244 37602 414
080 190 - Mid-Tex Gas Division Addition 080.66250 37800 290
080 190 - Mid-Tex Gas Division Addition 080.66252 37602 232
080 190 - Mid-Tex Gas Division Addition 080.66252 38000 12
080 190 - Mid-Tex Gas Division Addition 080.66258 37800 48
080 190 - Mid-Tex Gas Division Addition 080.66261 37800 50
080 190 - Mid-Tex Gas Division Addition 080.66262 37602 197,665
080 190 - Mid-Tex Gas Division Addition 080.66262 38000 21,963
080 190 - Mid-Tex Gas Division Addition 080.66272 37601 172
080 190 - Mid-Tex Gas Division Addition 080.66272 37602 15
080 190 - Mid-Tex Gas Division Addition 080.66273 37602 11,074
MTX Additions by FERC
Page 43 of 101
441
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.66273 38000 2,768
080 190 - Mid-Tex Gas Division Addition 080.66274 37602 33,405
080 190 - Mid-Tex Gas Division Addition 080.66274 38000 14,317
080 190 - Mid-Tex Gas Division Addition 080.66275 37602 6,831
080 190 - Mid-Tex Gas Division Addition 080.66275 38000 594
080 190 - Mid-Tex Gas Division Addition 080.66277 37800 48
080 190 - Mid-Tex Gas Division Addition 080.66279 37602 8,082
080 190 - Mid-Tex Gas Division Addition 080.66284 37800 3,084
080 190 - Mid-Tex Gas Division Addition 080.66295 37602 12,797
080 190 - Mid-Tex Gas Division Addition 080.66297 37602 959
080 190 - Mid-Tex Gas Division Addition 080.66298 37602 36,916
080 190 - Mid-Tex Gas Division Addition 080.66298 38000 4,102
080 190 - Mid-Tex Gas Division Addition 080.66299 37602 4,487
080 190 - Mid-Tex Gas Division Addition 080.66299 38000 139
080 190 - Mid-Tex Gas Division Addition 080.66301 37602 69,451
080 190 - Mid-Tex Gas Division Addition 080.66301 38000 12,259
080 190 - Mid-Tex Gas Division Addition 080.66302 37602 84
080 190 - Mid-Tex Gas Division Addition 080.66305 37602 -
080 190 - Mid-Tex Gas Division Addition 080.66312 37602 (2,649)
080 190 - Mid-Tex Gas Division Addition 080.66328 37800 299
080 190 - Mid-Tex Gas Division Addition 080.66330 37602 103,351
080 190 - Mid-Tex Gas Division Addition 080.66338 37602 71,615
080 190 - Mid-Tex Gas Division Addition 080.66338 38000 3,768
080 190 - Mid-Tex Gas Division Addition 080.66373 37601 111,190
080 190 - Mid-Tex Gas Division Addition 080.66376 37602 2,955
080 190 - Mid-Tex Gas Division Addition 080.66376 38000 155
080 190 - Mid-Tex Gas Division Addition 080.66384 37601 27,703
080 190 - Mid-Tex Gas Division Addition 080.66391 37800 501
080 190 - Mid-Tex Gas Division Addition 080.66392 37602 78,597
080 190 - Mid-Tex Gas Division Addition 080.66392 38000 4,137
080 190 - Mid-Tex Gas Division Addition 080.66395 37602 13,534
080 190 - Mid-Tex Gas Division Addition 080.66398 37602 160
080 190 - Mid-Tex Gas Division Addition 080.66398 38000 8
080 190 - Mid-Tex Gas Division Addition 080.66403 37602 3,823
080 190 - Mid-Tex Gas Division Addition 080.66403 38000 244
080 190 - Mid-Tex Gas Division Addition 080.66430 37602 11,425
080 190 - Mid-Tex Gas Division Addition 080.66447 37602 28,613
080 190 - Mid-Tex Gas Division Addition 080.66447 38000 5,049
080 190 - Mid-Tex Gas Division Addition 080.66462 37602 1,089
080 190 - Mid-Tex Gas Division Addition 080.66463 37800 53
080 190 - Mid-Tex Gas Division Addition 080.66479 37602 35,635
080 190 - Mid-Tex Gas Division Addition 080.66479 38000 727
080 190 - Mid-Tex Gas Division Addition 080.66490 37601 13
080 190 - Mid-Tex Gas Division Addition 080.66490 37602 28
080 190 - Mid-Tex Gas Division Addition 080.66490 38000 0
080 190 - Mid-Tex Gas Division Addition 080.66508 37602 54,554
080 190 - Mid-Tex Gas Division Addition 080.66508 37800 5,320
080 190 - Mid-Tex Gas Division Addition 080.66508 38000 6,650
080 190 - Mid-Tex Gas Division Addition 080.66510 37602 1,716
080 190 - Mid-Tex Gas Division Addition 080.66510 38000 191
080 190 - Mid-Tex Gas Division Addition 080.66557 37601 695,368
080 190 - Mid-Tex Gas Division Addition 080.66563 37602 15,079
080 190 - Mid-Tex Gas Division Addition 080.66563 38000 794
080 190 - Mid-Tex Gas Division Addition 080.66564 37602 7,738
080 190 - Mid-Tex Gas Division Addition 080.66564 37800 6,190
080 190 - Mid-Tex Gas Division Addition 080.66581 37602 3,674
080 190 - Mid-Tex Gas Division Addition 080.66581 37800 8,571
080 190 - Mid-Tex Gas Division Addition 080.66582 37601 5,123
080 190 - Mid-Tex Gas Division Addition 080.66583 37601 18,863
080 190 - Mid-Tex Gas Division Addition 080.66583 38000 38,563
080 190 - Mid-Tex Gas Division Addition 080.66584 37601 21,149
080 190 - Mid-Tex Gas Division Addition 080.66586 37602 9,963
080 190 - Mid-Tex Gas Division Addition 080.66586 37800 14,944
080 190 - Mid-Tex Gas Division Addition 080.66597 37602 1,507
080 190 - Mid-Tex Gas Division Addition 080.66597 38000 47
080 190 - Mid-Tex Gas Division Addition 080.66605 37602 1,566
080 190 - Mid-Tex Gas Division Addition 080.66605 38000 82
080 190 - Mid-Tex Gas Division Addition 080.66610 37602 548
080 190 - Mid-Tex Gas Division Addition 080.66629 37602 19,558
080 190 - Mid-Tex Gas Division Addition 080.66629 37800 28,358
080 190 - Mid-Tex Gas Division Addition 080.66629 38000 978
080 190 - Mid-Tex Gas Division Addition 080.66639 37602 12,043
080 190 - Mid-Tex Gas Division Addition 080.66639 38000 61
080 190 - Mid-Tex Gas Division Addition 080.66650 37602 9,800
080 190 - Mid-Tex Gas Division Addition 080.66650 37800 24,499
080 190 - Mid-Tex Gas Division Addition 080.66650 38000 700
080 190 - Mid-Tex Gas Division Addition 080.66651 37600 1,649
080 190 - Mid-Tex Gas Division Addition 080.66653 37602 310
080 190 - Mid-Tex Gas Division Addition 080.66654 37602 28,522
080 190 - Mid-Tex Gas Division Addition 080.66654 37800 22,818
080 190 - Mid-Tex Gas Division Addition 080.66654 38000 5,704
080 190 - Mid-Tex Gas Division Addition 080.66655 37602 2,514
080 190 - Mid-Tex Gas Division Addition 080.66655 38000 279
080 190 - Mid-Tex Gas Division Addition 080.66656 37602 12,342
080 190 - Mid-Tex Gas Division Addition 080.66656 38000 7,857
080 190 - Mid-Tex Gas Division Addition 080.66666 37601 5,380,731
080 190 - Mid-Tex Gas Division Addition 080.66668 37602 21,371
080 190 - Mid-Tex Gas Division Addition 080.66668 38000 7,124
080 190 - Mid-Tex Gas Division Addition 080.66669 37602 26,685
080 190 - Mid-Tex Gas Division Addition 080.66669 38000 18,059
080 190 - Mid-Tex Gas Division Addition 080.66670 37602 70,449
080 190 - Mid-Tex Gas Division Addition 080.66670 38000 18,923
080 190 - Mid-Tex Gas Division Addition 080.66671 37800 463
080 190 - Mid-Tex Gas Division Addition 080.66672 37601 645
080 190 - Mid-Tex Gas Division Addition 080.66672 37602 5,160
080 190 - Mid-Tex Gas Division Addition 080.66672 37800 26,444
080 190 - Mid-Tex Gas Division Addition 080.66673 37601 761
080 190 - Mid-Tex Gas Division Addition 080.66673 37602 6,087
080 190 - Mid-Tex Gas Division Addition 080.66673 37800 25,490
080 190 - Mid-Tex Gas Division Addition 080.66675 37800 21
080 190 - Mid-Tex Gas Division Addition 080.66678 37602 10,391
080 190 - Mid-Tex Gas Division Addition 080.66686 37602 1,380
080 190 - Mid-Tex Gas Division Addition 080.66686 38000 67
080 190 - Mid-Tex Gas Division Addition 080.66692 37602 50,093
080 190 - Mid-Tex Gas Division Addition 080.66692 38000 12,523
080 190 - Mid-Tex Gas Division Addition 080.66696 37602 2,638
080 190 - Mid-Tex Gas Division Addition 080.66696 38000 293
MTX Additions by FERC
Page 44 of 101
442
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.66701 37602 27,388
080 190 - Mid-Tex Gas Division Addition 080.66701 38000 702
080 190 - Mid-Tex Gas Division Addition 080.66704 37602 22,433
080 190 - Mid-Tex Gas Division Addition 080.66708 37602 670
080 190 - Mid-Tex Gas Division Addition 080.66708 38000 74
080 190 - Mid-Tex Gas Division Addition 080.66709 37602 5,716
080 190 - Mid-Tex Gas Division Addition 080.66709 37800 3,811
080 190 - Mid-Tex Gas Division Addition 080.66713 37602 8,507
080 190 - Mid-Tex Gas Division Addition 080.66713 38000 448
080 190 - Mid-Tex Gas Division Addition 080.66715 38000 162
080 190 - Mid-Tex Gas Division Addition 080.66717 37602 22,301
080 190 - Mid-Tex Gas Division Addition 080.66717 37800 27,257
080 190 - Mid-Tex Gas Division Addition 080.66718 37602 61,530
080 190 - Mid-Tex Gas Division Addition 080.66718 38000 28,955
080 190 - Mid-Tex Gas Division Addition 080.66726 37602 3,033
080 190 - Mid-Tex Gas Division Addition 080.66726 37800 4,550
080 190 - Mid-Tex Gas Division Addition 080.66728 37602 5,218
080 190 - Mid-Tex Gas Division Addition 080.66728 37800 8,637
080 190 - Mid-Tex Gas Division Addition 080.66728 38000 1,041
080 190 - Mid-Tex Gas Division Addition 080.66732 37602 4,792
080 190 - Mid-Tex Gas Division Addition 080.66732 37800 8,900
080 190 - Mid-Tex Gas Division Addition 080.66736 37602 3,693
080 190 - Mid-Tex Gas Division Addition 080.66736 38000 412
080 190 - Mid-Tex Gas Division Addition 080.66748 37602 4,015
080 190 - Mid-Tex Gas Division Addition 080.66748 38000 2,681
080 190 - Mid-Tex Gas Division Addition 080.66752 37602 36,915
080 190 - Mid-Tex Gas Division Addition 080.66752 38000 412
080 190 - Mid-Tex Gas Division Addition 080.66755 37602 22,818
080 190 - Mid-Tex Gas Division Addition 080.66755 38000 4,027
080 190 - Mid-Tex Gas Division Addition 080.66764 37601 18
080 190 - Mid-Tex Gas Division Addition 080.66769 37602 63,791
080 190 - Mid-Tex Gas Division Addition 080.66769 38000 3,357
080 190 - Mid-Tex Gas Division Addition 080.66771 37602 1,136
080 190 - Mid-Tex Gas Division Addition 080.66771 37800 4,544
080 190 - Mid-Tex Gas Division Addition 080.66775 37601 76,069
080 190 - Mid-Tex Gas Division Addition 080.66792 37602 5,750
080 190 - Mid-Tex Gas Division Addition 080.66793 37602 47,418
080 190 - Mid-Tex Gas Division Addition 080.66801 37602 13,590
080 190 - Mid-Tex Gas Division Addition 080.66801 38000 1,510
080 190 - Mid-Tex Gas Division Addition 080.66804 37602 15,370
080 190 - Mid-Tex Gas Division Addition 080.66804 38000 2,712
080 190 - Mid-Tex Gas Division Addition 080.66805 37602 5,804
080 190 - Mid-Tex Gas Division Addition 080.66805 38000 4,501
080 190 - Mid-Tex Gas Division Addition 080.66809 37601 1,093,642
080 190 - Mid-Tex Gas Division Addition 080.66810 37602 3,263
080 190 - Mid-Tex Gas Division Addition 080.66810 38000 67
080 190 - Mid-Tex Gas Division Addition 080.66815 37602 19,269
080 190 - Mid-Tex Gas Division Addition 080.66815 38000 2,141
080 190 - Mid-Tex Gas Division Addition 080.66817 37602 8,913
080 190 - Mid-Tex Gas Division Addition 080.66822 37602 24,297
080 190 - Mid-Tex Gas Division Addition 080.66822 38000 7,673
080 190 - Mid-Tex Gas Division Addition 080.66831 37602 15,237
080 190 - Mid-Tex Gas Division Addition 080.66841 37602 38,116
080 190 - Mid-Tex Gas Division Addition 080.66846 38000 1,032
080 190 - Mid-Tex Gas Division Addition 080.66850 37602 37,889
080 190 - Mid-Tex Gas Division Addition 080.66850 38000 16,260
080 190 - Mid-Tex Gas Division Addition 080.66859 37602 14,748
080 190 - Mid-Tex Gas Division Addition 080.66859 38000 1,640
080 190 - Mid-Tex Gas Division Addition 080.66862 37800 154
080 190 - Mid-Tex Gas Division Addition 080.66866 37602 17,637
080 190 - Mid-Tex Gas Division Addition 080.66866 38000 11,758
080 190 - Mid-Tex Gas Division Addition 080.66867 37800 322
080 190 - Mid-Tex Gas Division Addition 080.66869 38000 13,813
080 190 - Mid-Tex Gas Division Addition 080.66870 37602 70,881
080 190 - Mid-Tex Gas Division Addition 080.66870 38000 47,254
080 190 - Mid-Tex Gas Division Addition 080.66873 37602 4,494
080 190 - Mid-Tex Gas Division Addition 080.66878 37601 9,665
080 190 - Mid-Tex Gas Division Addition 080.66878 37800 15,464
080 190 - Mid-Tex Gas Division Addition 080.66878 38000 9,665
080 190 - Mid-Tex Gas Division Addition 080.66878 38100 9,665
080 190 - Mid-Tex Gas Division Addition 080.66887 37602 47
080 190 - Mid-Tex Gas Division Addition 080.66890 37602 1,320
080 190 - Mid-Tex Gas Division Addition 080.66890 38000 233
080 190 - Mid-Tex Gas Division Addition 080.66925 37602 15,833
080 190 - Mid-Tex Gas Division Addition 080.66925 38000 160
080 190 - Mid-Tex Gas Division Addition 080.66926 37602 300
080 190 - Mid-Tex Gas Division Addition 080.66927 37800 3,295
080 190 - Mid-Tex Gas Division Addition 080.66934 37800 452
080 190 - Mid-Tex Gas Division Addition 080.66956 38000 2,428
080 190 - Mid-Tex Gas Division Addition 080.66959 37602 16,077
080 190 - Mid-Tex Gas Division Addition 080.66959 38000 847
080 190 - Mid-Tex Gas Division Addition 080.66972 37900 660
080 190 - Mid-Tex Gas Division Addition 080.66976 37602 2,651
080 190 - Mid-Tex Gas Division Addition 080.66976 38000 470
080 190 - Mid-Tex Gas Division Addition 080.66980 37602 14,591
080 190 - Mid-Tex Gas Division Addition 080.66983 37602 8,286
080 190 - Mid-Tex Gas Division Addition 080.66983 38000 436
080 190 - Mid-Tex Gas Division Addition 080.66997 37602 25,453
080 190 - Mid-Tex Gas Division Addition 080.66997 38000 5,972
080 190 - Mid-Tex Gas Division Addition 080.67008 37602 7,732
080 190 - Mid-Tex Gas Division Addition 080.67008 38000 78
080 190 - Mid-Tex Gas Division Addition 080.67010 37602 23,286
080 190 - Mid-Tex Gas Division Addition 080.67010 38000 476
080 190 - Mid-Tex Gas Division Addition 080.67027 37602 39,961
080 190 - Mid-Tex Gas Division Addition 080.67027 38000 404
080 190 - Mid-Tex Gas Division Addition 080.67030 37602 13,955
080 190 - Mid-Tex Gas Division Addition 080.67033 37602 11,958
080 190 - Mid-Tex Gas Division Addition 080.67058 37800 308
080 190 - Mid-Tex Gas Division Addition 080.67060 37602 0
080 190 - Mid-Tex Gas Division Addition 080.67072 37602 7,766
080 190 - Mid-Tex Gas Division Addition 080.67072 38000 3,439
080 190 - Mid-Tex Gas Division Addition 080.67075 37602 385
080 190 - Mid-Tex Gas Division Addition 080.67077 37601 151,106
080 190 - Mid-Tex Gas Division Addition 080.67096 37602 5,122
080 190 - Mid-Tex Gas Division Addition 080.67096 38000 572
080 190 - Mid-Tex Gas Division Addition 080.67099 37602 24,599
080 190 - Mid-Tex Gas Division Addition 080.67099 38000 2,762
MTX Additions by FERC
Page 45 of 101
443
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.67106 37602 -
080 190 - Mid-Tex Gas Division Addition 080.67113 37602 6,207
080 190 - Mid-Tex Gas Division Addition 080.67113 38000 2,069
080 190 - Mid-Tex Gas Division Addition 080.67115 37602 23,711
080 190 - Mid-Tex Gas Division Addition 080.67138 37601 19,989
080 190 - Mid-Tex Gas Division Addition 080.67139 37602 21,649
080 190 - Mid-Tex Gas Division Addition 080.67142 37602 13,777
080 190 - Mid-Tex Gas Division Addition 080.67142 38000 13,791
080 190 - Mid-Tex Gas Division Addition 080.67162 37602 42,615
080 190 - Mid-Tex Gas Division Addition 080.67166 37602 3,747
080 190 - Mid-Tex Gas Division Addition 080.67166 38000 661
080 190 - Mid-Tex Gas Division Addition 080.67167 37602 1,155
080 190 - Mid-Tex Gas Division Addition 080.67183 37602 7,496
080 190 - Mid-Tex Gas Division Addition 080.67210 37800 4,329
080 190 - Mid-Tex Gas Division Addition 080.67213 37602 17,118
080 190 - Mid-Tex Gas Division Addition 080.67213 38000 1,909
080 190 - Mid-Tex Gas Division Addition 080.67216 37602 13,342
080 190 - Mid-Tex Gas Division Addition 080.67219 37602 12,873
080 190 - Mid-Tex Gas Division Addition 080.67219 37800 2,411
080 190 - Mid-Tex Gas Division Addition 080.67219 38000 805
080 190 - Mid-Tex Gas Division Addition 080.67226 37602 266,066
080 190 - Mid-Tex Gas Division Addition 080.67226 38000 5,430
080 190 - Mid-Tex Gas Division Addition 080.67227 37602 62,795
080 190 - Mid-Tex Gas Division Addition 080.67228 37601 6,062
080 190 - Mid-Tex Gas Division Addition 080.67228 37602 297,046
080 190 - Mid-Tex Gas Division Addition 080.67229 37602 24,605
080 190 - Mid-Tex Gas Division Addition 080.67230 37602 107,367
080 190 - Mid-Tex Gas Division Addition 080.67231 37601 46,138
080 190 - Mid-Tex Gas Division Addition 080.67231 37602 30,758
080 190 - Mid-Tex Gas Division Addition 080.67232 37602 15,418
080 190 - Mid-Tex Gas Division Addition 080.67237 37602 11,134
080 190 - Mid-Tex Gas Division Addition 080.67241 37601 518
080 190 - Mid-Tex Gas Division Addition 080.67245 37602 16,036
080 190 - Mid-Tex Gas Division Addition 080.67245 38000 6,872
080 190 - Mid-Tex Gas Division Addition 080.67250 37602 37,802
080 190 - Mid-Tex Gas Division Addition 080.67250 38000 1,169
080 190 - Mid-Tex Gas Division Addition 080.67255 37602 2,759
080 190 - Mid-Tex Gas Division Addition 080.67255 38000 145
080 190 - Mid-Tex Gas Division Addition 080.67266 37602 11,971
080 190 - Mid-Tex Gas Division Addition 080.67266 37800 630
080 190 - Mid-Tex Gas Division Addition 080.67267 37602 8,754
080 190 - Mid-Tex Gas Division Addition 080.67270 37602 7,475
080 190 - Mid-Tex Gas Division Addition 080.67270 38000 1,869
080 190 - Mid-Tex Gas Division Addition 080.67272 37602 825
080 190 - Mid-Tex Gas Division Addition 080.67280 37602 13,703
080 190 - Mid-Tex Gas Division Addition 080.67280 38000 9,135
080 190 - Mid-Tex Gas Division Addition 080.67287 37602 13,805
080 190 - Mid-Tex Gas Division Addition 080.67287 38000 429
080 190 - Mid-Tex Gas Division Addition 080.67295 37602 1,655
080 190 - Mid-Tex Gas Division Addition 080.67296 37602 5,219
080 190 - Mid-Tex Gas Division Addition 080.67322 37602 16,242
080 190 - Mid-Tex Gas Division Addition 080.67322 38000 855
080 190 - Mid-Tex Gas Division Addition 080.67332 37602 11,831
080 190 - Mid-Tex Gas Division Addition 080.67332 38000 3,944
080 190 - Mid-Tex Gas Division Addition 080.67336 37602 34,210
080 190 - Mid-Tex Gas Division Addition 080.67336 38000 1,425
080 190 - Mid-Tex Gas Division Addition 080.67339 37602 (68)
080 190 - Mid-Tex Gas Division Addition 080.67343 37602 2,684
080 190 - Mid-Tex Gas Division Addition 080.67346 37602 5,662
080 190 - Mid-Tex Gas Division Addition 080.67346 38000 313
080 190 - Mid-Tex Gas Division Addition 080.67347 37602 18,914
080 190 - Mid-Tex Gas Division Addition 080.67347 38000 4,728
080 190 - Mid-Tex Gas Division Addition 080.67350 37800 3,895
080 190 - Mid-Tex Gas Division Addition 080.67352 37602 8,718
080 190 - Mid-Tex Gas Division Addition 080.67354 37602 23,063
080 190 - Mid-Tex Gas Division Addition 080.67354 38000 5,766
080 190 - Mid-Tex Gas Division Addition 080.67355 37602 11,251
080 190 - Mid-Tex Gas Division Addition 080.67355 38000 2,813
080 190 - Mid-Tex Gas Division Addition 080.67359 37602 19,561
080 190 - Mid-Tex Gas Division Addition 080.67359 38000 8,384
080 190 - Mid-Tex Gas Division Addition 080.67362 37602 27,908
080 190 - Mid-Tex Gas Division Addition 080.67362 38000 4,925
080 190 - Mid-Tex Gas Division Addition 080.67363 37602 6,069
080 190 - Mid-Tex Gas Division Addition 080.67363 38000 1,517
080 190 - Mid-Tex Gas Division Addition 080.67364 37602 18,284
080 190 - Mid-Tex Gas Division Addition 080.67364 38000 6,095
080 190 - Mid-Tex Gas Division Addition 080.67365 37602 9,750
080 190 - Mid-Tex Gas Division Addition 080.67365 38000 3,250
080 190 - Mid-Tex Gas Division Addition 080.67366 37602 26,173
080 190 - Mid-Tex Gas Division Addition 080.67366 38000 1,378
080 190 - Mid-Tex Gas Division Addition 080.67370 37602 78,038
080 190 - Mid-Tex Gas Division Addition 080.67370 38000 4,107
080 190 - Mid-Tex Gas Division Addition 080.67372 37602 5,919
080 190 - Mid-Tex Gas Division Addition 080.67378 37602 1,590
080 190 - Mid-Tex Gas Division Addition 080.67381 37602 506
080 190 - Mid-Tex Gas Division Addition 080.67381 38000 91
080 190 - Mid-Tex Gas Division Addition 080.67385 37602 -
080 190 - Mid-Tex Gas Division Addition 080.67388 37602 409
080 190 - Mid-Tex Gas Division Addition 080.67389 37602 14,390
080 190 - Mid-Tex Gas Division Addition 080.67390 37602 5,904
080 190 - Mid-Tex Gas Division Addition 080.67397 37602 32,583
080 190 - Mid-Tex Gas Division Addition 080.67397 38000 9,733
080 190 - Mid-Tex Gas Division Addition 080.67401 37602 15,238
080 190 - Mid-Tex Gas Division Addition 080.67401 38000 1,511
080 190 - Mid-Tex Gas Division Addition 080.67403 37602 1,966
080 190 - Mid-Tex Gas Division Addition 080.67409 37601 405
080 190 - Mid-Tex Gas Division Addition 080.67411 37602 -
080 190 - Mid-Tex Gas Division Addition 080.67422 37601 3,434
080 190 - Mid-Tex Gas Division Addition 080.67422 37602 24,059
080 190 - Mid-Tex Gas Division Addition 080.67422 38000 6,874
080 190 - Mid-Tex Gas Division Addition 080.67436 37602 34,695
080 190 - Mid-Tex Gas Division Addition 080.67436 38000 3,855
080 190 - Mid-Tex Gas Division Addition 080.67455 37602 104,187
080 190 - Mid-Tex Gas Division Addition 080.67455 38000 7,842
080 190 - Mid-Tex Gas Division Addition 080.67468 37601 317
080 190 - Mid-Tex Gas Division Addition 080.67469 37602 12,875
080 190 - Mid-Tex Gas Division Addition 080.67469 38000 6,933
MTX Additions by FERC
Page 46 of 101
444
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.67478 37602 5,354
080 190 - Mid-Tex Gas Division Addition 080.67495 37800 609
080 190 - Mid-Tex Gas Division Addition 080.67497 37602 21,451
080 190 - Mid-Tex Gas Division Addition 080.67497 38000 2,384
080 190 - Mid-Tex Gas Division Addition 080.67498 37602 38,453
080 190 - Mid-Tex Gas Division Addition 080.67498 38000 6,786
080 190 - Mid-Tex Gas Division Addition 080.67544 37800 678
080 190 - Mid-Tex Gas Division Addition 080.67551 37602 8,820
080 190 - Mid-Tex Gas Division Addition 080.67551 38000 464
080 190 - Mid-Tex Gas Division Addition 080.67556 38000 21,721
080 190 - Mid-Tex Gas Division Addition 080.67560 37602 2,986
080 190 - Mid-Tex Gas Division Addition 080.67560 38000 158
080 190 - Mid-Tex Gas Division Addition 080.67562 37602 17,160
080 190 - Mid-Tex Gas Division Addition 080.67562 38000 2,121
080 190 - Mid-Tex Gas Division Addition 080.67566 37602 30,241
080 190 - Mid-Tex Gas Division Addition 080.67566 38000 30,242
080 190 - Mid-Tex Gas Division Addition 080.67573 37602 43,732
080 190 - Mid-Tex Gas Division Addition 080.67580 37602 10,774
080 190 - Mid-Tex Gas Division Addition 080.67583 37602 2,611
080 190 - Mid-Tex Gas Division Addition 080.67589 37800 1,180
080 190 - Mid-Tex Gas Division Addition 080.67590 37602 65,874
080 190 - Mid-Tex Gas Division Addition 080.67592 37602 5,258
080 190 - Mid-Tex Gas Division Addition 080.67597 37602 6,194
080 190 - Mid-Tex Gas Division Addition 080.67598 37800 42
080 190 - Mid-Tex Gas Division Addition 080.67604 37602 36,746
080 190 - Mid-Tex Gas Division Addition 080.67604 38000 2,346
080 190 - Mid-Tex Gas Division Addition 080.67610 37602 85,061
080 190 - Mid-Tex Gas Division Addition 080.67623 38000 2,203
080 190 - Mid-Tex Gas Division Addition 080.67626 37602 2,779
080 190 - Mid-Tex Gas Division Addition 080.67629 37800 1,024
080 190 - Mid-Tex Gas Division Addition 080.67631 37602 32,082
080 190 - Mid-Tex Gas Division Addition 080.67631 38000 655
080 190 - Mid-Tex Gas Division Addition 080.67644 37602 5,979
080 190 - Mid-Tex Gas Division Addition 080.67672 37800 9,658
080 190 - Mid-Tex Gas Division Addition 080.67682 37602 13,771
080 190 - Mid-Tex Gas Division Addition 080.67682 38000 3,652
080 190 - Mid-Tex Gas Division Addition 080.67683 37800 311
080 190 - Mid-Tex Gas Division Addition 080.67688 37602 5,387
080 190 - Mid-Tex Gas Division Addition 080.67688 38000 1,348
080 190 - Mid-Tex Gas Division Addition 080.67720 37602 40,465
080 190 - Mid-Tex Gas Division Addition 080.67720 38000 3,046
080 190 - Mid-Tex Gas Division Addition 080.67727 37602 7,544
080 190 - Mid-Tex Gas Division Addition 080.67731 37602 5,676
080 190 - Mid-Tex Gas Division Addition 080.67748 38000 11,935
080 190 - Mid-Tex Gas Division Addition 080.67753 37602 9,135
080 190 - Mid-Tex Gas Division Addition 080.67753 38000 1,015
080 190 - Mid-Tex Gas Division Addition 080.67754 37602 12,457
080 190 - Mid-Tex Gas Division Addition 080.67754 38000 656
080 190 - Mid-Tex Gas Division Addition 080.67757 37602 64
080 190 - Mid-Tex Gas Division Addition 080.67766 37602 2,983
080 190 - Mid-Tex Gas Division Addition 080.67772 37800 39
080 190 - Mid-Tex Gas Division Addition 080.67774 37800 597
080 190 - Mid-Tex Gas Division Addition 080.67782 37602 58,821
080 190 - Mid-Tex Gas Division Addition 080.67782 38000 19,263
080 190 - Mid-Tex Gas Division Addition 080.67783 37602 8,777
080 190 - Mid-Tex Gas Division Addition 080.67783 38000 2,194
080 190 - Mid-Tex Gas Division Addition 080.67791 37602 27,835
080 190 - Mid-Tex Gas Division Addition 080.67792 37602 191,962
080 190 - Mid-Tex Gas Division Addition 080.67792 38000 1,939
080 190 - Mid-Tex Gas Division Addition 080.67806 37602 7,868
080 190 - Mid-Tex Gas Division Addition 080.67824 37602 183
080 190 - Mid-Tex Gas Division Addition 080.67825 37602 62,348
080 190 - Mid-Tex Gas Division Addition 080.67826 37602 62,548
080 190 - Mid-Tex Gas Division Addition 080.67827 37602 125,929
080 190 - Mid-Tex Gas Division Addition 080.67827 38000 67,808
080 190 - Mid-Tex Gas Division Addition 080.67829 37602 2,496
080 190 - Mid-Tex Gas Division Addition 080.67829 37800 6,989
080 190 - Mid-Tex Gas Division Addition 080.67829 38000 499
080 190 - Mid-Tex Gas Division Addition 080.67833 37602 17,471
080 190 - Mid-Tex Gas Division Addition 080.67833 38000 4,367
080 190 - Mid-Tex Gas Division Addition 080.67843 37602 28,153
080 190 - Mid-Tex Gas Division Addition 080.67846 37601 374
080 190 - Mid-Tex Gas Division Addition 080.67854 37602 1,319
080 190 - Mid-Tex Gas Division Addition 080.67854 37800 2,273
080 190 - Mid-Tex Gas Division Addition 080.67854 38000 183
080 190 - Mid-Tex Gas Division Addition 080.67855 37602 18,445
080 190 - Mid-Tex Gas Division Addition 080.67860 37602 3,887
080 190 - Mid-Tex Gas Division Addition 080.67860 37800 2,851
080 190 - Mid-Tex Gas Division Addition 080.67873 37602 294
080 190 - Mid-Tex Gas Division Addition 080.67873 37800 2,647
080 190 - Mid-Tex Gas Division Addition 080.67887 37602 12,705
080 190 - Mid-Tex Gas Division Addition 080.67887 38000 3,188
080 190 - Mid-Tex Gas Division Addition 080.67888 37602 15,068
080 190 - Mid-Tex Gas Division Addition 080.67893 37602 30,131
080 190 - Mid-Tex Gas Division Addition 080.67895 37602 10,686
080 190 - Mid-Tex Gas Division Addition 080.67895 38000 1,897
080 190 - Mid-Tex Gas Division Addition 080.67908 37602 20,228
080 190 - Mid-Tex Gas Division Addition 080.67908 38000 1,065
080 190 - Mid-Tex Gas Division Addition 080.67909 37602 8,487
080 190 - Mid-Tex Gas Division Addition 080.67909 38000 174
080 190 - Mid-Tex Gas Division Addition 080.67911 37602 17,221
080 190 - Mid-Tex Gas Division Addition 080.67911 38000 1,914
080 190 - Mid-Tex Gas Division Addition 080.67912 37602 13,924
080 190 - Mid-Tex Gas Division Addition 080.67912 37800 6,962
080 190 - Mid-Tex Gas Division Addition 080.67912 38000 2,321
080 190 - Mid-Tex Gas Division Addition 080.67913 37602 1,545
080 190 - Mid-Tex Gas Division Addition 080.67913 37800 4,010
080 190 - Mid-Tex Gas Division Addition 080.67913 38000 772
080 190 - Mid-Tex Gas Division Addition 080.67920 37602 3,040
080 190 - Mid-Tex Gas Division Addition 080.67930 37602 61,247
080 190 - Mid-Tex Gas Division Addition 080.67930 38000 3,225
080 190 - Mid-Tex Gas Division Addition 080.67933 38000 35,416
080 190 - Mid-Tex Gas Division Addition 080.67934 37602 6,879
080 190 - Mid-Tex Gas Division Addition 080.67934 38000 764
080 190 - Mid-Tex Gas Division Addition 080.67939 37800 156
080 190 - Mid-Tex Gas Division Addition 080.67946 37800 551
080 190 - Mid-Tex Gas Division Addition 080.67952 37602 611
MTX Additions by FERC
Page 47 of 101
445
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.67952 37800 4,278
080 190 - Mid-Tex Gas Division Addition 080.67953 37602 8,191
080 190 - Mid-Tex Gas Division Addition 080.67953 37800 983
080 190 - Mid-Tex Gas Division Addition 080.67955 37602 7,359
080 190 - Mid-Tex Gas Division Addition 080.67955 37800 4,906
080 190 - Mid-Tex Gas Division Addition 080.67956 37602 3,966
080 190 - Mid-Tex Gas Division Addition 080.67956 37800 6,795
080 190 - Mid-Tex Gas Division Addition 080.67956 38000 566
080 190 - Mid-Tex Gas Division Addition 080.67957 37602 6,862
080 190 - Mid-Tex Gas Division Addition 080.67957 37800 3,920
080 190 - Mid-Tex Gas Division Addition 080.67957 38000 244
080 190 - Mid-Tex Gas Division Addition 080.67959 37602 3,119
080 190 - Mid-Tex Gas Division Addition 080.67959 37800 4,678
080 190 - Mid-Tex Gas Division Addition 080.67961 37602 7,760
080 190 - Mid-Tex Gas Division Addition 080.67961 37800 1,370
080 190 - Mid-Tex Gas Division Addition 080.67962 37602 6,306
080 190 - Mid-Tex Gas Division Addition 080.67962 37800 1,112
080 190 - Mid-Tex Gas Division Addition 080.67964 37601 4,499
080 190 - Mid-Tex Gas Division Addition 080.67966 37602 8,842
080 190 - Mid-Tex Gas Division Addition 080.67966 37800 5,895
080 190 - Mid-Tex Gas Division Addition 080.67967 37602 3,982
080 190 - Mid-Tex Gas Division Addition 080.67967 37800 2,658
080 190 - Mid-Tex Gas Division Addition 080.67968 37602 3,491
080 190 - Mid-Tex Gas Division Addition 080.67968 37800 5,237
080 190 - Mid-Tex Gas Division Addition 080.67969 37602 4,894
080 190 - Mid-Tex Gas Division Addition 080.67969 37800 1,632
080 190 - Mid-Tex Gas Division Addition 080.67970 37602 4,146
080 190 - Mid-Tex Gas Division Addition 080.67970 37800 4,620
080 190 - Mid-Tex Gas Division Addition 080.67971 37602 19,708
080 190 - Mid-Tex Gas Division Addition 080.67971 38000 3,478
080 190 - Mid-Tex Gas Division Addition 080.67972 37602 14,460
080 190 - Mid-Tex Gas Division Addition 080.67972 38000 2,552
080 190 - Mid-Tex Gas Division Addition 080.67973 37602 22,007
080 190 - Mid-Tex Gas Division Addition 080.67973 38000 2,445
080 190 - Mid-Tex Gas Division Addition 080.67974 37602 11,179
080 190 - Mid-Tex Gas Division Addition 080.67974 38000 4,791
080 190 - Mid-Tex Gas Division Addition 080.67988 37602 1,429
080 190 - Mid-Tex Gas Division Addition 080.67988 38000 98
080 190 - Mid-Tex Gas Division Addition 080.68023 37602 7,656
080 190 - Mid-Tex Gas Division Addition 080.68023 38000 1,144
080 190 - Mid-Tex Gas Division Addition 080.68029 37601 27,477
080 190 - Mid-Tex Gas Division Addition 080.68047 37602 9,017
080 190 - Mid-Tex Gas Division Addition 080.68047 38000 3,507
080 190 - Mid-Tex Gas Division Addition 080.68063 37602 7,552
080 190 - Mid-Tex Gas Division Addition 080.68078 37602 17,356
080 190 - Mid-Tex Gas Division Addition 080.68078 38000 354
080 190 - Mid-Tex Gas Division Addition 080.68081 37602 32,859
080 190 - Mid-Tex Gas Division Addition 080.68081 38000 2,097
080 190 - Mid-Tex Gas Division Addition 080.68093 37602 1,980
080 190 - Mid-Tex Gas Division Addition 080.68108 37602 9,064
080 190 - Mid-Tex Gas Division Addition 080.68108 38000 2,266
080 190 - Mid-Tex Gas Division Addition 080.68110 37602 12,919
080 190 - Mid-Tex Gas Division Addition 080.68118 37601 322
080 190 - Mid-Tex Gas Division Addition 080.68124 37602 4,627
080 190 - Mid-Tex Gas Division Addition 080.68128 37602 52,102
080 190 - Mid-Tex Gas Division Addition 080.68157 37602 37,226
080 190 - Mid-Tex Gas Division Addition 080.68157 38000 4,136
080 190 - Mid-Tex Gas Division Addition 080.68162 37602 30
080 190 - Mid-Tex Gas Division Addition 080.68185 37602 801
080 190 - Mid-Tex Gas Division Addition 080.68209 37602 38,877
080 190 - Mid-Tex Gas Division Addition 080.68209 38000 3,380
080 190 - Mid-Tex Gas Division Addition 080.68212 38000 46,104
080 190 - Mid-Tex Gas Division Addition 080.68225 37600 6,277
080 190 - Mid-Tex Gas Division Addition 080.68240 37602 92,652
080 190 - Mid-Tex Gas Division Addition 080.68245 37602 26,331
080 190 - Mid-Tex Gas Division Addition 080.68245 38000 159
080 190 - Mid-Tex Gas Division Addition 080.68248 37602 59,319
080 190 - Mid-Tex Gas Division Addition 080.68248 38000 20,842
080 190 - Mid-Tex Gas Division Addition 080.68252 37602 42,762
080 190 - Mid-Tex Gas Division Addition 080.68252 38000 432
080 190 - Mid-Tex Gas Division Addition 080.68253 37602 22,538
080 190 - Mid-Tex Gas Division Addition 080.68253 38000 22,313
080 190 - Mid-Tex Gas Division Addition 080.68255 37602 19,701
080 190 - Mid-Tex Gas Division Addition 080.68255 38000 18,186
080 190 - Mid-Tex Gas Division Addition 080.68256 37602 63,211
080 190 - Mid-Tex Gas Division Addition 080.68258 37600 6,977
080 190 - Mid-Tex Gas Division Addition 080.68259 37602 33,172
080 190 - Mid-Tex Gas Division Addition 080.68259 38000 802
080 190 - Mid-Tex Gas Division Addition 080.68261 37602 38,595
080 190 - Mid-Tex Gas Division Addition 080.68261 38000 990
080 190 - Mid-Tex Gas Division Addition 080.68262 37602 20,138
080 190 - Mid-Tex Gas Division Addition 080.68262 38000 20,138
080 190 - Mid-Tex Gas Division Addition 080.68264 37602 69,695
080 190 - Mid-Tex Gas Division Addition 080.68264 38000 12,299
080 190 - Mid-Tex Gas Division Addition 080.68266 37602 2,792
080 190 - Mid-Tex Gas Division Addition 080.68266 38000 310
080 190 - Mid-Tex Gas Division Addition 080.68269 37602 17,208
080 190 - Mid-Tex Gas Division Addition 080.68269 38000 5,736
080 190 - Mid-Tex Gas Division Addition 080.68271 37602 58,475
080 190 - Mid-Tex Gas Division Addition 080.68271 38000 1,193
080 190 - Mid-Tex Gas Division Addition 080.68272 37602 4,356
080 190 - Mid-Tex Gas Division Addition 080.68272 37800 2,906
080 190 - Mid-Tex Gas Division Addition 080.68273 37602 3,873
080 190 - Mid-Tex Gas Division Addition 080.68273 37800 3,873
080 190 - Mid-Tex Gas Division Addition 080.68278 37602 14,110
080 190 - Mid-Tex Gas Division Addition 080.68279 37602 4,343
080 190 - Mid-Tex Gas Division Addition 080.68279 37800 5,429
080 190 - Mid-Tex Gas Division Addition 080.68279 38000 1,086
080 190 - Mid-Tex Gas Division Addition 080.68287 37602 9,789
080 190 - Mid-Tex Gas Division Addition 080.68287 38000 344
080 190 - Mid-Tex Gas Division Addition 080.68290 37602 -
080 190 - Mid-Tex Gas Division Addition 080.68294 37602 4,063
080 190 - Mid-Tex Gas Division Addition 080.68294 37800 3,252
080 190 - Mid-Tex Gas Division Addition 080.68294 38000 813
080 190 - Mid-Tex Gas Division Addition 080.68308 37602 -
080 190 - Mid-Tex Gas Division Addition 080.68309 37602 15,569
080 190 - Mid-Tex Gas Division Addition 080.68309 38000 5,190
MTX Additions by FERC
Page 48 of 101
446
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.68310 37602 66,416
080 190 - Mid-Tex Gas Division Addition 080.68310 38000 66,416
080 190 - Mid-Tex Gas Division Addition 080.68312 37602 43,503
080 190 - Mid-Tex Gas Division Addition 080.68312 38000 14,501
080 190 - Mid-Tex Gas Division Addition 080.68313 37602 27,789
080 190 - Mid-Tex Gas Division Addition 080.68314 37602 49,806
080 190 - Mid-Tex Gas Division Addition 080.68314 38000 1,131
080 190 - Mid-Tex Gas Division Addition 080.68315 37602 32,193
080 190 - Mid-Tex Gas Division Addition 080.68315 38000 996
080 190 - Mid-Tex Gas Division Addition 080.68316 37602 32,434
080 190 - Mid-Tex Gas Division Addition 080.68316 38000 845
080 190 - Mid-Tex Gas Division Addition 080.68318 37602 41,846
080 190 - Mid-Tex Gas Division Addition 080.68318 38000 1,241
080 190 - Mid-Tex Gas Division Addition 080.68335 37800 3,558
080 190 - Mid-Tex Gas Division Addition 080.68337 37602 576
080 190 - Mid-Tex Gas Division Addition 080.68337 37800 576
080 190 - Mid-Tex Gas Division Addition 080.68344 37601 62,385
080 190 - Mid-Tex Gas Division Addition 080.68346 37602 2,754
080 190 - Mid-Tex Gas Division Addition 080.68346 37800 2,754
080 190 - Mid-Tex Gas Division Addition 080.68349 37602 3,058
080 190 - Mid-Tex Gas Division Addition 080.68353 37602 28
080 190 - Mid-Tex Gas Division Addition 080.68360 37602 23,866
080 190 - Mid-Tex Gas Division Addition 080.68361 37602 32,388
080 190 - Mid-Tex Gas Division Addition 080.68361 38000 3,599
080 190 - Mid-Tex Gas Division Addition 080.68365 37602 9,706
080 190 - Mid-Tex Gas Division Addition 080.68365 38000 844
080 190 - Mid-Tex Gas Division Addition 080.68373 37602 (12,698)
080 190 - Mid-Tex Gas Division Addition 080.68374 37602 48,176
080 190 - Mid-Tex Gas Division Addition 080.68374 38000 1,225
080 190 - Mid-Tex Gas Division Addition 080.68375 37602 18,436
080 190 - Mid-Tex Gas Division Addition 080.68375 38000 667
080 190 - Mid-Tex Gas Division Addition 080.68385 37602 42,014
080 190 - Mid-Tex Gas Division Addition 080.68385 38000 18,006
080 190 - Mid-Tex Gas Division Addition 080.68386 37602 23,826
080 190 - Mid-Tex Gas Division Addition 080.68386 38000 10,211
080 190 - Mid-Tex Gas Division Addition 080.68393 37602 78,969
080 190 - Mid-Tex Gas Division Addition 080.68393 37800 105
080 190 - Mid-Tex Gas Division Addition 080.68393 38000 1,392
080 190 - Mid-Tex Gas Division Addition 080.68395 37602 53,279
080 190 - Mid-Tex Gas Division Addition 080.68395 37800 81
080 190 - Mid-Tex Gas Division Addition 080.68395 38000 912
080 190 - Mid-Tex Gas Division Addition 080.68396 37602 64,890
080 190 - Mid-Tex Gas Division Addition 080.68396 38000 861
080 190 - Mid-Tex Gas Division Addition 080.68398 37602 60,247
080 190 - Mid-Tex Gas Division Addition 080.68399 37602 30,752
080 190 - Mid-Tex Gas Division Addition 080.68399 38000 4,430
080 190 - Mid-Tex Gas Division Addition 080.68400 37602 30,803
080 190 - Mid-Tex Gas Division Addition 080.68400 38000 1,621
080 190 - Mid-Tex Gas Division Addition 080.68403 37602 27,414
080 190 - Mid-Tex Gas Division Addition 080.68403 38000 6,853
080 190 - Mid-Tex Gas Division Addition 080.68404 37602 37,397
080 190 - Mid-Tex Gas Division Addition 080.68404 38000 9,349
080 190 - Mid-Tex Gas Division Addition 080.68407 37602 19,531
080 190 - Mid-Tex Gas Division Addition 080.68407 38000 814
080 190 - Mid-Tex Gas Division Addition 080.68408 37601 1,696
080 190 - Mid-Tex Gas Division Addition 080.68411 37602 48,230
080 190 - Mid-Tex Gas Division Addition 080.68411 38000 25,970
080 190 - Mid-Tex Gas Division Addition 080.68416 37602 70,006
080 190 - Mid-Tex Gas Division Addition 080.68416 38000 7,778
080 190 - Mid-Tex Gas Division Addition 080.68418 37800 1,901
080 190 - Mid-Tex Gas Division Addition 080.68421 37602 37,547
080 190 - Mid-Tex Gas Division Addition 080.68421 38000 16,091
080 190 - Mid-Tex Gas Division Addition 080.68422 37602 138,113
080 190 - Mid-Tex Gas Division Addition 080.68422 38000 34,528
080 190 - Mid-Tex Gas Division Addition 080.68423 37602 11,819
080 190 - Mid-Tex Gas Division Addition 080.68423 38000 7
080 190 - Mid-Tex Gas Division Addition 080.68427 37602 3,204
080 190 - Mid-Tex Gas Division Addition 080.68429 37601 58
080 190 - Mid-Tex Gas Division Addition 080.68429 37602 197,522
080 190 - Mid-Tex Gas Division Addition 080.68435 37602 2,173
080 190 - Mid-Tex Gas Division Addition 080.68435 37800 7,706
080 190 - Mid-Tex Gas Division Addition 080.68438 37602 7,595
080 190 - Mid-Tex Gas Division Addition 080.68438 38000 1,135
080 190 - Mid-Tex Gas Division Addition 080.68439 37602 2,274
080 190 - Mid-Tex Gas Division Addition 080.68439 37800 9,098
080 190 - Mid-Tex Gas Division Addition 080.68447 37602 18,376
080 190 - Mid-Tex Gas Division Addition 080.68447 38000 2,746
080 190 - Mid-Tex Gas Division Addition 080.68448 37602 21,319
080 190 - Mid-Tex Gas Division Addition 080.68453 37601 23
080 190 - Mid-Tex Gas Division Addition 080.68454 37602 6,113
080 190 - Mid-Tex Gas Division Addition 080.68455 37602 -
080 190 - Mid-Tex Gas Division Addition 080.68465 37602 14,635
080 190 - Mid-Tex Gas Division Addition 080.68468 37602 10,711
080 190 - Mid-Tex Gas Division Addition 080.68474 37602 34,594
080 190 - Mid-Tex Gas Division Addition 080.68474 38000 8,649
080 190 - Mid-Tex Gas Division Addition 080.68477 37602 18,227
080 190 - Mid-Tex Gas Division Addition 080.68477 38000 2,025
080 190 - Mid-Tex Gas Division Addition 080.68482 37602 3,729
080 190 - Mid-Tex Gas Division Addition 080.68482 38000 196
080 190 - Mid-Tex Gas Division Addition 080.68485 37602 26,052
080 190 - Mid-Tex Gas Division Addition 080.68486 37602 1,790
080 190 - Mid-Tex Gas Division Addition 080.68487 37602 48,322
080 190 - Mid-Tex Gas Division Addition 080.68487 38000 12,081
080 190 - Mid-Tex Gas Division Addition 080.68499 37602 18,806
080 190 - Mid-Tex Gas Division Addition 080.68499 38000 18,806
080 190 - Mid-Tex Gas Division Addition 080.68501 37602 31,489
080 190 - Mid-Tex Gas Division Addition 080.68501 38000 1,657
080 190 - Mid-Tex Gas Division Addition 080.68503 37602 1,912
080 190 - Mid-Tex Gas Division Addition 080.68503 38000 7,648
080 190 - Mid-Tex Gas Division Addition 080.68510 37602 51,985
080 190 - Mid-Tex Gas Division Addition 080.68513 37601 95
080 190 - Mid-Tex Gas Division Addition 080.68514 37602 34,564
080 190 - Mid-Tex Gas Division Addition 080.68514 38000 706
080 190 - Mid-Tex Gas Division Addition 080.68515 37602 37,907
080 190 - Mid-Tex Gas Division Addition 080.68515 38000 964
080 190 - Mid-Tex Gas Division Addition 080.68516 37602 30,589
080 190 - Mid-Tex Gas Division Addition 080.68516 38000 409
MTX Additions by FERC
Page 49 of 101
447
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.68517 37602 55,675
080 190 - Mid-Tex Gas Division Addition 080.68517 38000 619
080 190 - Mid-Tex Gas Division Addition 080.68518 37602 24,658
080 190 - Mid-Tex Gas Division Addition 080.68518 38000 1,574
080 190 - Mid-Tex Gas Division Addition 080.68519 37602 68,920
080 190 - Mid-Tex Gas Division Addition 080.68519 38000 465
080 190 - Mid-Tex Gas Division Addition 080.68520 37602 4,860
080 190 - Mid-Tex Gas Division Addition 080.68520 38000 647
080 190 - Mid-Tex Gas Division Addition 080.68521 37602 38,059
080 190 - Mid-Tex Gas Division Addition 080.68521 38000 1,177
080 190 - Mid-Tex Gas Division Addition 080.68522 37602 27,281
080 190 - Mid-Tex Gas Division Addition 080.68522 38000 85
080 190 - Mid-Tex Gas Division Addition 080.68523 37602 30,865
080 190 - Mid-Tex Gas Division Addition 080.68523 38000 879
080 190 - Mid-Tex Gas Division Addition 080.68524 37602 24,663
080 190 - Mid-Tex Gas Division Addition 080.68524 38000 771
080 190 - Mid-Tex Gas Division Addition 080.68529 37602 24,252
080 190 - Mid-Tex Gas Division Addition 080.68534 37602 52,981
080 190 - Mid-Tex Gas Division Addition 080.68534 38000 5,887
080 190 - Mid-Tex Gas Division Addition 080.68536 37602 68,956
080 190 - Mid-Tex Gas Division Addition 080.68536 38000 12,169
080 190 - Mid-Tex Gas Division Addition 080.68541 37602 50,693
080 190 - Mid-Tex Gas Division Addition 080.68546 37600 6,635
080 190 - Mid-Tex Gas Division Addition 080.68561 37602 566
080 190 - Mid-Tex Gas Division Addition 080.68562 37600 167
080 190 - Mid-Tex Gas Division Addition 080.68562 37602 3,171
080 190 - Mid-Tex Gas Division Addition 080.68564 37602 39,690
080 190 - Mid-Tex Gas Division Addition 080.68566 37602 14,986
080 190 - Mid-Tex Gas Division Addition 080.68571 37800 1,845
080 190 - Mid-Tex Gas Division Addition 080.68574 37601 2,082,116
080 190 - Mid-Tex Gas Division Addition 080.68576 37600 114,478
080 190 - Mid-Tex Gas Division Addition 080.68576 37601 2,747,480
080 190 - Mid-Tex Gas Division Addition 080.68582 37602 40,318
080 190 - Mid-Tex Gas Division Addition 080.68582 38000 13,440
080 190 - Mid-Tex Gas Division Addition 080.68583 37602 18,999
080 190 - Mid-Tex Gas Division Addition 080.68583 38000 18,999
080 190 - Mid-Tex Gas Division Addition 080.68586 37602 21,461
080 190 - Mid-Tex Gas Division Addition 080.68586 38000 21,461
080 190 - Mid-Tex Gas Division Addition 080.68594 37602 -
080 190 - Mid-Tex Gas Division Addition 080.68597 37602 828
080 190 - Mid-Tex Gas Division Addition 080.68609 37601 711
080 190 - Mid-Tex Gas Division Addition 080.68619 37602 35,242
080 190 - Mid-Tex Gas Division Addition 080.68619 38000 6,219
080 190 - Mid-Tex Gas Division Addition 080.68622 37602 38,499
080 190 - Mid-Tex Gas Division Addition 080.68622 38000 25,666
080 190 - Mid-Tex Gas Division Addition 080.68623 37602 39,492
080 190 - Mid-Tex Gas Division Addition 080.68623 38000 371
080 190 - Mid-Tex Gas Division Addition 080.68628 37601 80,193
080 190 - Mid-Tex Gas Division Addition 080.68635 37800 27,797
080 190 - Mid-Tex Gas Division Addition 080.68646 37602 18,222
080 190 - Mid-Tex Gas Division Addition 080.68646 38000 18,222
080 190 - Mid-Tex Gas Division Addition 080.68650 37602 53,490
080 190 - Mid-Tex Gas Division Addition 080.68650 38000 53,490
080 190 - Mid-Tex Gas Division Addition 080.68652 37602 17,465
080 190 - Mid-Tex Gas Division Addition 080.68655 37602 16,810
080 190 - Mid-Tex Gas Division Addition 080.68655 38000 16,809
080 190 - Mid-Tex Gas Division Addition 080.68656 37602 38,225
080 190 - Mid-Tex Gas Division Addition 080.68656 38000 25,483
080 190 - Mid-Tex Gas Division Addition 080.68657 37602 48,942
080 190 - Mid-Tex Gas Division Addition 080.68657 38000 32,628
080 190 - Mid-Tex Gas Division Addition 080.68659 37602 27,179
080 190 - Mid-Tex Gas Division Addition 080.68659 38000 6,795
080 190 - Mid-Tex Gas Division Addition 080.68682 37602 43,360
080 190 - Mid-Tex Gas Division Addition 080.68682 38000 4,819
080 190 - Mid-Tex Gas Division Addition 080.68694 37602 34,559
080 190 - Mid-Tex Gas Division Addition 080.68694 38000 8,640
080 190 - Mid-Tex Gas Division Addition 080.68696 37602 12,529
080 190 - Mid-Tex Gas Division Addition 080.68696 38000 127
080 190 - Mid-Tex Gas Division Addition 080.68698 37602 17,713
080 190 - Mid-Tex Gas Division Addition 080.68698 38000 7,008
080 190 - Mid-Tex Gas Division Addition 080.68704 37602 33,511
080 190 - Mid-Tex Gas Division Addition 080.68704 38000 3,723
080 190 - Mid-Tex Gas Division Addition 080.68705 37602 79,644
080 190 - Mid-Tex Gas Division Addition 080.68705 38000 4,192
080 190 - Mid-Tex Gas Division Addition 080.68709 37602 9,101
080 190 - Mid-Tex Gas Division Addition 080.68711 37602 18,715
080 190 - Mid-Tex Gas Division Addition 080.68711 38000 18,715
080 190 - Mid-Tex Gas Division Addition 080.68712 37602 3,697
080 190 - Mid-Tex Gas Division Addition 080.68713 37602 48,822
080 190 - Mid-Tex Gas Division Addition 080.68713 38000 20,924
080 190 - Mid-Tex Gas Division Addition 080.68714 37602 32,750
080 190 - Mid-Tex Gas Division Addition 080.68714 38000 331
080 190 - Mid-Tex Gas Division Addition 080.68717 37602 12,463
080 190 - Mid-Tex Gas Division Addition 080.68718 37602 -
080 190 - Mid-Tex Gas Division Addition 080.68724 37602 3,866
080 190 - Mid-Tex Gas Division Addition 080.68727 37602 (133,854)
080 190 - Mid-Tex Gas Division Addition 080.68732 37602 15,055
080 190 - Mid-Tex Gas Division Addition 080.68732 38000 792
080 190 - Mid-Tex Gas Division Addition 080.68733 37602 6,742
080 190 - Mid-Tex Gas Division Addition 080.68733 38000 355
080 190 - Mid-Tex Gas Division Addition 080.68746 37602 1,762
080 190 - Mid-Tex Gas Division Addition 080.68747 37602 16,559
080 190 - Mid-Tex Gas Division Addition 080.68747 38000 4,140
080 190 - Mid-Tex Gas Division Addition 080.68748 38000 1,716
080 190 - Mid-Tex Gas Division Addition 080.68749 37602 44,876
080 190 - Mid-Tex Gas Division Addition 080.68749 38000 7,919
080 190 - Mid-Tex Gas Division Addition 080.68750 37602 8,329
080 190 - Mid-Tex Gas Division Addition 080.68750 38000 2,082
080 190 - Mid-Tex Gas Division Addition 080.68751 37602 28,622
080 190 - Mid-Tex Gas Division Addition 080.68751 38000 28,621
080 190 - Mid-Tex Gas Division Addition 080.68759 37602 23,761
080 190 - Mid-Tex Gas Division Addition 080.68759 38000 1,251
080 190 - Mid-Tex Gas Division Addition 080.68764 37602 27,548
080 190 - Mid-Tex Gas Division Addition 080.68766 37602 34,790
080 190 - Mid-Tex Gas Division Addition 080.68766 38000 710
080 190 - Mid-Tex Gas Division Addition 080.68792 37602 23,345
080 190 - Mid-Tex Gas Division Addition 080.68792 38000 23,344
MTX Additions by FERC
Page 50 of 101
448
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.68793 37602 27,025
080 190 - Mid-Tex Gas Division Addition 080.68793 38000 24,946
080 190 - Mid-Tex Gas Division Addition 080.68794 37602 52,909
080 190 - Mid-Tex Gas Division Addition 080.68794 38000 35,273
080 190 - Mid-Tex Gas Division Addition 080.68798 37602 21,036
080 190 - Mid-Tex Gas Division Addition 080.68799 37602 30,205
080 190 - Mid-Tex Gas Division Addition 080.68799 38000 934
080 190 - Mid-Tex Gas Division Addition 080.68800 37602 25,204
080 190 - Mid-Tex Gas Division Addition 080.68800 38000 418
080 190 - Mid-Tex Gas Division Addition 080.68803 37602 31,322
080 190 - Mid-Tex Gas Division Addition 080.68803 38000 422
080 190 - Mid-Tex Gas Division Addition 080.68804 37602 54,075
080 190 - Mid-Tex Gas Division Addition 080.68807 37602 8,899
080 190 - Mid-Tex Gas Division Addition 080.68809 37602 9,249
080 190 - Mid-Tex Gas Division Addition 080.68810 37602 23,405
080 190 - Mid-Tex Gas Division Addition 080.68810 38000 1,232
080 190 - Mid-Tex Gas Division Addition 080.68812 37602 24,571
080 190 - Mid-Tex Gas Division Addition 080.68812 38000 248
080 190 - Mid-Tex Gas Division Addition 080.68813 37602 39,182
080 190 - Mid-Tex Gas Division Addition 080.68813 38000 2,062
080 190 - Mid-Tex Gas Division Addition 080.68814 37602 8,781
080 190 - Mid-Tex Gas Division Addition 080.68814 38000 2,195
080 190 - Mid-Tex Gas Division Addition 080.68816 37602 4,878
080 190 - Mid-Tex Gas Division Addition 080.68821 37601 41,166
080 190 - Mid-Tex Gas Division Addition 080.68823 37602 65,073
080 190 - Mid-Tex Gas Division Addition 080.68823 38000 1,477
080 190 - Mid-Tex Gas Division Addition 080.68828 37602 32,522
080 190 - Mid-Tex Gas Division Addition 080.68828 38000 292
080 190 - Mid-Tex Gas Division Addition 080.68830 37602 24,763
080 190 - Mid-Tex Gas Division Addition 080.68830 38000 557
080 190 - Mid-Tex Gas Division Addition 080.68831 37602 45,610
080 190 - Mid-Tex Gas Division Addition 080.68831 38000 493
080 190 - Mid-Tex Gas Division Addition 080.68833 37602 31,230
080 190 - Mid-Tex Gas Division Addition 080.68848 37602 2,197
080 190 - Mid-Tex Gas Division Addition 080.68848 38000 549
080 190 - Mid-Tex Gas Division Addition 080.68863 37602 8,572
080 190 - Mid-Tex Gas Division Addition 080.68863 38000 175
080 190 - Mid-Tex Gas Division Addition 080.68868 37602 34,535
080 190 - Mid-Tex Gas Division Addition 080.68868 38000 3,837
080 190 - Mid-Tex Gas Division Addition 080.68869 37602 9,750
080 190 - Mid-Tex Gas Division Addition 080.68869 38000 2,437
080 190 - Mid-Tex Gas Division Addition 080.68871 37602 8,537
080 190 - Mid-Tex Gas Division Addition 080.68871 38000 264
080 190 - Mid-Tex Gas Division Addition 080.68873 37602 40,830
080 190 - Mid-Tex Gas Division Addition 080.68873 38000 4,537
080 190 - Mid-Tex Gas Division Addition 080.68874 37602 1,977
080 190 - Mid-Tex Gas Division Addition 080.68877 37602 5,169
080 190 - Mid-Tex Gas Division Addition 080.68877 38000 5,169
080 190 - Mid-Tex Gas Division Addition 080.68890 37602 20,967
080 190 - Mid-Tex Gas Division Addition 080.68891 37602 643
080 190 - Mid-Tex Gas Division Addition 080.68918 37602 33,992
080 190 - Mid-Tex Gas Division Addition 080.68919 37602 12,431
080 190 - Mid-Tex Gas Division Addition 080.68919 38000 654
080 190 - Mid-Tex Gas Division Addition 080.68923 37602 11,811
080 190 - Mid-Tex Gas Division Addition 080.68923 38000 365
080 190 - Mid-Tex Gas Division Addition 080.68924 37602 41,552
080 190 - Mid-Tex Gas Division Addition 080.68924 38000 2,187
080 190 - Mid-Tex Gas Division Addition 080.68927 37602 102,304
080 190 - Mid-Tex Gas Division Addition 080.68927 38000 18,054
080 190 - Mid-Tex Gas Division Addition 080.68931 37602 6,650
080 190 - Mid-Tex Gas Division Addition 080.68931 38000 350
080 190 - Mid-Tex Gas Division Addition 080.68954 37601 25,261
080 190 - Mid-Tex Gas Division Addition 080.68956 37602 44,761
080 190 - Mid-Tex Gas Division Addition 080.68956 38000 2,356
080 190 - Mid-Tex Gas Division Addition 080.68957 37602 6,859
080 190 - Mid-Tex Gas Division Addition 080.68957 38000 1,715
080 190 - Mid-Tex Gas Division Addition 080.68958 37602 14,374
080 190 - Mid-Tex Gas Division Addition 080.68958 38000 1,597
080 190 - Mid-Tex Gas Division Addition 080.68960 37602 17,949
080 190 - Mid-Tex Gas Division Addition 080.68960 38000 1,994
080 190 - Mid-Tex Gas Division Addition 080.68990 37602 16,100
080 190 - Mid-Tex Gas Division Addition 080.68991 37602 10,155
080 190 - Mid-Tex Gas Division Addition 080.68991 38000 3,385
080 190 - Mid-Tex Gas Division Addition 080.68996 37602 65,207
080 190 - Mid-Tex Gas Division Addition 080.68996 38000 1,816
080 190 - Mid-Tex Gas Division Addition 080.69000 37602 50,184
080 190 - Mid-Tex Gas Division Addition 080.69000 38000 1,494
080 190 - Mid-Tex Gas Division Addition 080.69006 37602 25,486
080 190 - Mid-Tex Gas Division Addition 080.69008 37602 33,563
080 190 - Mid-Tex Gas Division Addition 080.69008 38000 709
080 190 - Mid-Tex Gas Division Addition 080.69010 38000 3,638
080 190 - Mid-Tex Gas Division Addition 080.69011 37602 35,667
080 190 - Mid-Tex Gas Division Addition 080.69011 38000 288
080 190 - Mid-Tex Gas Division Addition 080.69012 37602 26,453
080 190 - Mid-Tex Gas Division Addition 080.69012 38000 178
080 190 - Mid-Tex Gas Division Addition 080.69013 37602 30,128
080 190 - Mid-Tex Gas Division Addition 080.69014 37602 101,440
080 190 - Mid-Tex Gas Division Addition 080.69014 38000 2,071
080 190 - Mid-Tex Gas Division Addition 080.69015 37602 52,187
080 190 - Mid-Tex Gas Division Addition 080.69015 38000 5,798
080 190 - Mid-Tex Gas Division Addition 080.69016 37602 45,483
080 190 - Mid-Tex Gas Division Addition 080.69016 38000 11,371
080 190 - Mid-Tex Gas Division Addition 080.69024 37602 67,284
080 190 - Mid-Tex Gas Division Addition 080.69024 38000 11,874
080 190 - Mid-Tex Gas Division Addition 080.69026 37602 81,575
080 190 - Mid-Tex Gas Division Addition 080.69026 38000 20,394
080 190 - Mid-Tex Gas Division Addition 080.69051 37602 103,540
080 190 - Mid-Tex Gas Division Addition 080.69051 38000 25,885
080 190 - Mid-Tex Gas Division Addition 080.69052 37602 157,925
080 190 - Mid-Tex Gas Division Addition 080.69052 38000 17,547
080 190 - Mid-Tex Gas Division Addition 080.69056 37602 35,750
080 190 - Mid-Tex Gas Division Addition 080.69056 38000 6,309
080 190 - Mid-Tex Gas Division Addition 080.69057 37602 21,652
080 190 - Mid-Tex Gas Division Addition 080.69057 38000 21,652
080 190 - Mid-Tex Gas Division Addition 080.69061 38000 10,714
080 190 - Mid-Tex Gas Division Addition 080.69068 37602 374
080 190 - Mid-Tex Gas Division Addition 080.69077 37602 16,311
MTX Additions by FERC
Page 51 of 101
449
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.69077 38000 858
080 190 - Mid-Tex Gas Division Addition 080.69089 37602 11,501
080 190 - Mid-Tex Gas Division Addition 080.69089 37800 356
080 190 - Mid-Tex Gas Division Addition 080.69101 37602 4,838
080 190 - Mid-Tex Gas Division Addition 080.69113 37800 1,264
080 190 - Mid-Tex Gas Division Addition 080.69116 37602 44,032
080 190 - Mid-Tex Gas Division Addition 080.69125 37602 4,868
080 190 - Mid-Tex Gas Division Addition 080.69125 37800 3,246
080 190 - Mid-Tex Gas Division Addition 080.69138 37602 543
080 190 - Mid-Tex Gas Division Addition 080.69159 37602 23,397
080 190 - Mid-Tex Gas Division Addition 080.69159 38000 446
080 190 - Mid-Tex Gas Division Addition 080.69161 37602 18,979
080 190 - Mid-Tex Gas Division Addition 080.69162 37602 20,521
080 190 - Mid-Tex Gas Division Addition 080.69162 38000 74
080 190 - Mid-Tex Gas Division Addition 080.69164 37602 8,461
080 190 - Mid-Tex Gas Division Addition 080.69167 37602 20,182
080 190 - Mid-Tex Gas Division Addition 080.69167 38000 6,727
080 190 - Mid-Tex Gas Division Addition 080.69168 37602 40,488
080 190 - Mid-Tex Gas Division Addition 080.69168 38000 2,131
080 190 - Mid-Tex Gas Division Addition 080.69169 37602 54,018
080 190 - Mid-Tex Gas Division Addition 080.69169 38000 18,006
080 190 - Mid-Tex Gas Division Addition 080.69170 37601 2,340
080 190 - Mid-Tex Gas Division Addition 080.69170 37800 24
080 190 - Mid-Tex Gas Division Addition 080.69171 37602 29,547
080 190 - Mid-Tex Gas Division Addition 080.69171 38000 12,663
080 190 - Mid-Tex Gas Division Addition 080.69172 37602 82,735
080 190 - Mid-Tex Gas Division Addition 080.69172 38000 20,684
080 190 - Mid-Tex Gas Division Addition 080.69173 37602 70,727
080 190 - Mid-Tex Gas Division Addition 080.69173 38000 23,576
080 190 - Mid-Tex Gas Division Addition 080.69176 37602 18,196
080 190 - Mid-Tex Gas Division Addition 080.69176 38000 2,022
080 190 - Mid-Tex Gas Division Addition 080.69177 37602 43,014
080 190 - Mid-Tex Gas Division Addition 080.69177 38000 28,676
080 190 - Mid-Tex Gas Division Addition 080.69178 37602 37,001
080 190 - Mid-Tex Gas Division Addition 080.69178 38000 24,667
080 190 - Mid-Tex Gas Division Addition 080.69179 37602 42,220
080 190 - Mid-Tex Gas Division Addition 080.69179 38000 10,555
080 190 - Mid-Tex Gas Division Addition 080.69180 37602 32,571
080 190 - Mid-Tex Gas Division Addition 080.69180 38000 8,143
080 190 - Mid-Tex Gas Division Addition 080.69181 37602 57,688
080 190 - Mid-Tex Gas Division Addition 080.69181 38000 938
080 190 - Mid-Tex Gas Division Addition 080.69196 37602 -
080 190 - Mid-Tex Gas Division Addition 080.69205 37602 14,194
080 190 - Mid-Tex Gas Division Addition 080.69205 38000 3,549
080 190 - Mid-Tex Gas Division Addition 080.69206 38000 83,741
080 190 - Mid-Tex Gas Division Addition 080.69207 37602 28,513
080 190 - Mid-Tex Gas Division Addition 080.69207 38000 19,008
080 190 - Mid-Tex Gas Division Addition 080.69208 37602 72,088
080 190 - Mid-Tex Gas Division Addition 080.69208 38000 1,023
080 190 - Mid-Tex Gas Division Addition 080.69209 37602 62,256
080 190 - Mid-Tex Gas Division Addition 080.69209 38000 15,564
080 190 - Mid-Tex Gas Division Addition 080.69212 37602 20,906
080 190 - Mid-Tex Gas Division Addition 080.69212 38000 1,301
080 190 - Mid-Tex Gas Division Addition 080.69213 37602 3,700
080 190 - Mid-Tex Gas Division Addition 080.69213 37800 2,465
080 190 - Mid-Tex Gas Division Addition 080.69220 37602 1,983
080 190 - Mid-Tex Gas Division Addition 080.69220 37800 1,322
080 190 - Mid-Tex Gas Division Addition 080.69221 37601 195,002
080 190 - Mid-Tex Gas Division Addition 080.69221 37602 1,716,020
080 190 - Mid-Tex Gas Division Addition 080.69221 38000 39,000
080 190 - Mid-Tex Gas Division Addition 080.69222 37602 1,329
080 190 - Mid-Tex Gas Division Addition 080.69224 37602 11,849
080 190 - Mid-Tex Gas Division Addition 080.69224 37800 627
080 190 - Mid-Tex Gas Division Addition 080.69226 37602 42,342
080 190 - Mid-Tex Gas Division Addition 080.69226 38000 28,228
080 190 - Mid-Tex Gas Division Addition 080.69227 37602 29,103
080 190 - Mid-Tex Gas Division Addition 080.69227 38000 29,103
080 190 - Mid-Tex Gas Division Addition 080.69235 37602 -
080 190 - Mid-Tex Gas Division Addition 080.69237 37602 966
080 190 - Mid-Tex Gas Division Addition 080.69241 37602 20,572
080 190 - Mid-Tex Gas Division Addition 080.69241 38000 6,857
080 190 - Mid-Tex Gas Division Addition 080.69248 37602 3,996
080 190 - Mid-Tex Gas Division Addition 080.69248 37800 3,995
080 190 - Mid-Tex Gas Division Addition 080.69262 37800 828
080 190 - Mid-Tex Gas Division Addition 080.69274 37602 33,485
080 190 - Mid-Tex Gas Division Addition 080.69275 37602 60,220
080 190 - Mid-Tex Gas Division Addition 080.69277 37602 16,193
080 190 - Mid-Tex Gas Division Addition 080.69277 38000 81
080 190 - Mid-Tex Gas Division Addition 080.69294 37602 530
080 190 - Mid-Tex Gas Division Addition 080.69302 37602 25,162
080 190 - Mid-Tex Gas Division Addition 080.69302 38000 16,774
080 190 - Mid-Tex Gas Division Addition 080.69303 37602 42,537
080 190 - Mid-Tex Gas Division Addition 080.69303 38000 18,230
080 190 - Mid-Tex Gas Division Addition 080.69304 37602 45,659
080 190 - Mid-Tex Gas Division Addition 080.69304 38000 19,568
080 190 - Mid-Tex Gas Division Addition 080.69312 37602 24,931
080 190 - Mid-Tex Gas Division Addition 080.69313 37602 22,300
080 190 - Mid-Tex Gas Division Addition 080.69313 38000 11,487
080 190 - Mid-Tex Gas Division Addition 080.69315 37602 111,195
080 190 - Mid-Tex Gas Division Addition 080.69316 37602 7,723
080 190 - Mid-Tex Gas Division Addition 080.69316 38000 858
080 190 - Mid-Tex Gas Division Addition 080.69317 37602 817
080 190 - Mid-Tex Gas Division Addition 080.69321 37602 11,752
080 190 - Mid-Tex Gas Division Addition 080.69323 37602 39,207
080 190 - Mid-Tex Gas Division Addition 080.69323 38000 2,951
080 190 - Mid-Tex Gas Division Addition 080.69331 37601 7,770
080 190 - Mid-Tex Gas Division Addition 080.69333 37602 11,856
080 190 - Mid-Tex Gas Division Addition 080.69341 37602 20,216
080 190 - Mid-Tex Gas Division Addition 080.69341 38000 3,851
080 190 - Mid-Tex Gas Division Addition 080.69344 37602 29,696
080 190 - Mid-Tex Gas Division Addition 080.69344 38000 8,870
080 190 - Mid-Tex Gas Division Addition 080.69349 37602 9,612
080 190 - Mid-Tex Gas Division Addition 080.69373 37602 19,922
080 190 - Mid-Tex Gas Division Addition 080.69373 37800 8,945
080 190 - Mid-Tex Gas Division Addition 080.69373 38000 2,033
080 190 - Mid-Tex Gas Division Addition 080.69375 37602 34,824
080 190 - Mid-Tex Gas Division Addition 080.69375 38000 711
MTX Additions by FERC
Page 52 of 101
450
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.69378 38000 2,361
080 190 - Mid-Tex Gas Division Addition 080.69378 38100 3,541
080 190 - Mid-Tex Gas Division Addition 080.69404 37602 -
080 190 - Mid-Tex Gas Division Addition 080.69414 37602 30,018
080 190 - Mid-Tex Gas Division Addition 080.69417 37602 9,641
080 190 - Mid-Tex Gas Division Addition 080.69417 38000 728
080 190 - Mid-Tex Gas Division Addition 080.69420 37602 9,851
080 190 - Mid-Tex Gas Division Addition 080.69420 38000 1,947
080 190 - Mid-Tex Gas Division Addition 080.69426 37602 8,096
080 190 - Mid-Tex Gas Division Addition 080.69430 37602 37,415
080 190 - Mid-Tex Gas Division Addition 080.69430 38000 473
080 190 - Mid-Tex Gas Division Addition 080.69432 37602 8,957
080 190 - Mid-Tex Gas Division Addition 080.69433 37602 23,527
080 190 - Mid-Tex Gas Division Addition 080.69433 38000 497
080 190 - Mid-Tex Gas Division Addition 080.69434 37602 38,401
080 190 - Mid-Tex Gas Division Addition 080.69434 38000 509
080 190 - Mid-Tex Gas Division Addition 080.69435 37602 18,805
080 190 - Mid-Tex Gas Division Addition 080.69435 38000 6,269
080 190 - Mid-Tex Gas Division Addition 080.69436 37602 76,482
080 190 - Mid-Tex Gas Division Addition 080.69436 38000 8,498
080 190 - Mid-Tex Gas Division Addition 080.69437 37602 34,172
080 190 - Mid-Tex Gas Division Addition 080.69437 38000 697
080 190 - Mid-Tex Gas Division Addition 080.69438 37602 49,846
080 190 - Mid-Tex Gas Division Addition 080.69438 38000 8,797
080 190 - Mid-Tex Gas Division Addition 080.69439 37602 3,224
080 190 - Mid-Tex Gas Division Addition 080.69440 37602 2,506
080 190 - Mid-Tex Gas Division Addition 080.69440 38000 33,000
080 190 - Mid-Tex Gas Division Addition 080.69441 37602 63,837
080 190 - Mid-Tex Gas Division Addition 080.69441 38000 21,279
080 190 - Mid-Tex Gas Division Addition 080.69447 37602 8,349
080 190 - Mid-Tex Gas Division Addition 080.69447 38000 50
080 190 - Mid-Tex Gas Division Addition 080.69451 37602 259,356
080 190 - Mid-Tex Gas Division Addition 080.69469 37602 2,023
080 190 - Mid-Tex Gas Division Addition 080.69470 37602 32,725
080 190 - Mid-Tex Gas Division Addition 080.69470 38000 14,025
080 190 - Mid-Tex Gas Division Addition 080.69484 37602 5,401
080 190 - Mid-Tex Gas Division Addition 080.69491 37602 9,326
080 190 - Mid-Tex Gas Division Addition 080.69491 38000 94
080 190 - Mid-Tex Gas Division Addition 080.69504 37602 16,211
080 190 - Mid-Tex Gas Division Addition 080.69504 38000 1,801
080 190 - Mid-Tex Gas Division Addition 080.69519 38000 10,958
080 190 - Mid-Tex Gas Division Addition 080.69561 37602 7,999
080 190 - Mid-Tex Gas Division Addition 080.69561 38000 2,681
080 190 - Mid-Tex Gas Division Addition 080.69562 37602 157
080 190 - Mid-Tex Gas Division Addition 080.69563 37602 2,205
080 190 - Mid-Tex Gas Division Addition 080.69563 38000 735
080 190 - Mid-Tex Gas Division Addition 080.69569 37602 46,088
080 190 - Mid-Tex Gas Division Addition 080.69584 37602 6,418
080 190 - Mid-Tex Gas Division Addition 080.69584 37800 2,027
080 190 - Mid-Tex Gas Division Addition 080.69592 37602 1,198
080 190 - Mid-Tex Gas Division Addition 080.69592 37800 1,797
080 190 - Mid-Tex Gas Division Addition 080.69598 37602 10,345
080 190 - Mid-Tex Gas Division Addition 080.69598 38000 1,150
080 190 - Mid-Tex Gas Division Addition 080.69599 37602 10,381
080 190 - Mid-Tex Gas Division Addition 080.69599 37800 546
080 190 - Mid-Tex Gas Division Addition 080.69608 37602 1,586
080 190 - Mid-Tex Gas Division Addition 080.69622 37602 347
080 190 - Mid-Tex Gas Division Addition 080.69629 37602 2,458
080 190 - Mid-Tex Gas Division Addition 080.69631 37602 3,395
080 190 - Mid-Tex Gas Division Addition 080.69647 37602 956
080 190 - Mid-Tex Gas Division Addition 080.69666 37602 29,317
080 190 - Mid-Tex Gas Division Addition 080.69666 38000 3,258
080 190 - Mid-Tex Gas Division Addition 080.69673 37602 15,839
080 190 - Mid-Tex Gas Division Addition 080.69673 38000 1,760
080 190 - Mid-Tex Gas Division Addition 080.69675 37602 6,862
080 190 - Mid-Tex Gas Division Addition 080.69675 38000 10,092
080 190 - Mid-Tex Gas Division Addition 080.69676 37602 10,412
080 190 - Mid-Tex Gas Division Addition 080.69682 37602 -
080 190 - Mid-Tex Gas Division Addition 080.69687 37602 15,408
080 190 - Mid-Tex Gas Division Addition 080.69687 38000 6,603
080 190 - Mid-Tex Gas Division Addition 080.69695 37800 704
080 190 - Mid-Tex Gas Division Addition 080.69697 37602 27,248
080 190 - Mid-Tex Gas Division Addition 080.69697 38000 4,808
080 190 - Mid-Tex Gas Division Addition 080.69706 37800 535
080 190 - Mid-Tex Gas Division Addition 080.69707 37602 11,384
080 190 - Mid-Tex Gas Division Addition 080.69716 37602 6,095
080 190 - Mid-Tex Gas Division Addition 080.69719 37602 61,508
080 190 - Mid-Tex Gas Division Addition 080.69719 38000 12,600
080 190 - Mid-Tex Gas Division Addition 080.69720 37600 4,922
080 190 - Mid-Tex Gas Division Addition 080.69728 37602 5,760
080 190 - Mid-Tex Gas Division Addition 080.69740 37601 18,471
080 190 - Mid-Tex Gas Division Addition 080.69746 37602 9,321
080 190 - Mid-Tex Gas Division Addition 080.69753 37602 65,979
080 190 - Mid-Tex Gas Division Addition 080.69755 37601 1,421
080 190 - Mid-Tex Gas Division Addition 080.69755 37602 1,421
080 190 - Mid-Tex Gas Division Addition 080.69755 37800 1,421
080 190 - Mid-Tex Gas Division Addition 080.69755 38000 1,421
080 190 - Mid-Tex Gas Division Addition 080.69757 37800 6,907
080 190 - Mid-Tex Gas Division Addition 080.69759 37602 -
080 190 - Mid-Tex Gas Division Addition 080.69760 37601 20,999
080 190 - Mid-Tex Gas Division Addition 080.69760 37602 14,586
080 190 - Mid-Tex Gas Division Addition 080.69760 38000 14,586
080 190 - Mid-Tex Gas Division Addition 080.69761 37602 2,162
080 190 - Mid-Tex Gas Division Addition 080.69761 37800 19,454
080 190 - Mid-Tex Gas Division Addition 080.69779 37602 6,919
080 190 - Mid-Tex Gas Division Addition 080.69779 38000 1,730
080 190 - Mid-Tex Gas Division Addition 080.69783 37602 66,272
080 190 - Mid-Tex Gas Division Addition 080.69783 38000 534
080 190 - Mid-Tex Gas Division Addition 080.69785 37602 1,632
080 190 - Mid-Tex Gas Division Addition 080.69790 37602 5,309
080 190 - Mid-Tex Gas Division Addition 080.69790 38000 198
080 190 - Mid-Tex Gas Division Addition 080.69793 38000 16,613
080 190 - Mid-Tex Gas Division Addition 080.69803 37602 6,598
080 190 - Mid-Tex Gas Division Addition 080.69803 38000 1,165
080 190 - Mid-Tex Gas Division Addition 080.69813 37601 705
080 190 - Mid-Tex Gas Division Addition 080.69845 37601 1,660
080 190 - Mid-Tex Gas Division Addition 080.69845 37602 12,448
MTX Additions by FERC
Page 53 of 101
451
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.69845 38000 2,489
080 190 - Mid-Tex Gas Division Addition 080.69850 37602 775
080 190 - Mid-Tex Gas Division Addition 080.69863 37602 21,814
080 190 - Mid-Tex Gas Division Addition 080.69873 37602 1,352
080 190 - Mid-Tex Gas Division Addition 080.69884 37602 -
080 190 - Mid-Tex Gas Division Addition 080.69887 37602 454
080 190 - Mid-Tex Gas Division Addition 080.69896 37602 3,477
080 190 - Mid-Tex Gas Division Addition 080.69896 38000 183
080 190 - Mid-Tex Gas Division Addition 080.69904 37602 7,154
080 190 - Mid-Tex Gas Division Addition 080.69907 37602 2,806
080 190 - Mid-Tex Gas Division Addition 080.69907 38000 312
080 190 - Mid-Tex Gas Division Addition 080.69911 37602 -
080 190 - Mid-Tex Gas Division Addition 080.69912 37602 6,238
080 190 - Mid-Tex Gas Division Addition 080.69912 38000 3,359
080 190 - Mid-Tex Gas Division Addition 080.69922 37602 1,175
080 190 - Mid-Tex Gas Division Addition 080.69925 37602 1,987
080 190 - Mid-Tex Gas Division Addition 080.69929 37602 -
080 190 - Mid-Tex Gas Division Addition 080.69930 37602 -
080 190 - Mid-Tex Gas Division Addition 080.69932 37602 (29,040)
080 190 - Mid-Tex Gas Division Addition 080.69932 38000 (7,260)
080 190 - Mid-Tex Gas Division Addition 080.69934 37602 5,994
080 190 - Mid-Tex Gas Division Addition 080.69940 37602 2,681
080 190 - Mid-Tex Gas Division Addition 080.69940 38000 298
080 190 - Mid-Tex Gas Division Addition 080.69956 37602 3,928
080 190 - Mid-Tex Gas Division Addition 080.69957 37602 8,242
080 190 - Mid-Tex Gas Division Addition 080.69957 38000 1,244
080 190 - Mid-Tex Gas Division Addition 080.69958 37602 23,774
080 190 - Mid-Tex Gas Division Addition 080.69958 38000 17,934
080 190 - Mid-Tex Gas Division Addition 080.69962 37602 7,995
080 190 - Mid-Tex Gas Division Addition 080.69967 37800 4,488
080 190 - Mid-Tex Gas Division Addition 080.69978 37602 8,479
080 190 - Mid-Tex Gas Division Addition 080.69978 38000 446
080 190 - Mid-Tex Gas Division Addition 080.69981 37602 10,714
080 190 - Mid-Tex Gas Division Addition 080.69999 37602 340
080 190 - Mid-Tex Gas Division Addition 080.70009 37800 4,415
080 190 - Mid-Tex Gas Division Addition 080.70046 37602 287,224
080 190 - Mid-Tex Gas Division Addition 080.70066 37600 8,642
080 190 - Mid-Tex Gas Division Addition 080.70083 37602 31,164
080 190 - Mid-Tex Gas Division Addition 080.70094 37602 10,446
080 190 - Mid-Tex Gas Division Addition 080.70094 38000 8,356
080 190 - Mid-Tex Gas Division Addition 080.70099 37602 1,386
080 190 - Mid-Tex Gas Division Addition 080.70099 37800 1,995
080 190 - Mid-Tex Gas Division Addition 080.70104 37602 54,948
080 190 - Mid-Tex Gas Division Addition 080.70106 37602 807
080 190 - Mid-Tex Gas Division Addition 080.70121 37602 1,538
080 190 - Mid-Tex Gas Division Addition 080.70121 38000 81
080 190 - Mid-Tex Gas Division Addition 080.70123 37602 12,800
080 190 - Mid-Tex Gas Division Addition 080.70124 37800 331
080 190 - Mid-Tex Gas Division Addition 080.70126 37602 10,064
080 190 - Mid-Tex Gas Division Addition 080.70128 37602 13,561
080 190 - Mid-Tex Gas Division Addition 080.70132 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70137 38500 4,936
080 190 - Mid-Tex Gas Division Addition 080.70139 37800 326
080 190 - Mid-Tex Gas Division Addition 080.70141 37602 11,482
080 190 - Mid-Tex Gas Division Addition 080.70142 37602 3,395
080 190 - Mid-Tex Gas Division Addition 080.70144 37601 548
080 190 - Mid-Tex Gas Division Addition 080.70149 37602 14,600
080 190 - Mid-Tex Gas Division Addition 080.70149 38000 608
080 190 - Mid-Tex Gas Division Addition 080.70155 37601 737
080 190 - Mid-Tex Gas Division Addition 080.70155 37800 737
080 190 - Mid-Tex Gas Division Addition 080.70158 37602 2,436
080 190 - Mid-Tex Gas Division Addition 080.70161 37602 83,890
080 190 - Mid-Tex Gas Division Addition 080.70162 37602 4,512
080 190 - Mid-Tex Gas Division Addition 080.70166 37800 1,460
080 190 - Mid-Tex Gas Division Addition 080.70169 37602 14,813
080 190 - Mid-Tex Gas Division Addition 080.70169 38000 3,474
080 190 - Mid-Tex Gas Division Addition 080.70173 37800 1,294
080 190 - Mid-Tex Gas Division Addition 080.70176 37602 9,802
080 190 - Mid-Tex Gas Division Addition 080.70189 37602 276,885
080 190 - Mid-Tex Gas Division Addition 080.70193 37601 (0)
080 190 - Mid-Tex Gas Division Addition 080.70193 37602 1,366,620
080 190 - Mid-Tex Gas Division Addition 080.70194 37601 155,321
080 190 - Mid-Tex Gas Division Addition 080.70194 37602 4,070,023
080 190 - Mid-Tex Gas Division Addition 080.70195 37601 (2,202,405)
080 190 - Mid-Tex Gas Division Addition 080.70195 37602 5,363,062
080 190 - Mid-Tex Gas Division Addition 080.70195 38300 1,739
080 190 - Mid-Tex Gas Division Addition 080.70196 37601 0
080 190 - Mid-Tex Gas Division Addition 080.70196 37602 5,531,349
080 190 - Mid-Tex Gas Division Addition 080.70197 37601 379,121
080 190 - Mid-Tex Gas Division Addition 080.70197 37602 2,277,538
080 190 - Mid-Tex Gas Division Addition 080.70198 37601 0
080 190 - Mid-Tex Gas Division Addition 080.70198 37602 304,258
080 190 - Mid-Tex Gas Division Addition 080.70199 37601 166,809
080 190 - Mid-Tex Gas Division Addition 080.70199 37602 199,357
080 190 - Mid-Tex Gas Division Addition 080.70200 37601 -
080 190 - Mid-Tex Gas Division Addition 080.70200 37602 1,306,886
080 190 - Mid-Tex Gas Division Addition 080.70201 37601 269,675
080 190 - Mid-Tex Gas Division Addition 080.70201 37602 21,456,174
080 190 - Mid-Tex Gas Division Addition 080.70201 38100 33,833
080 190 - Mid-Tex Gas Division Addition 080.70201 38300 3,483
080 190 - Mid-Tex Gas Division Addition 080.70202 38000 2,666,062
080 190 - Mid-Tex Gas Division Addition 080.70203 38000 3,876,827
080 190 - Mid-Tex Gas Division Addition 080.70203 38100 51,434
080 190 - Mid-Tex Gas Division Addition 080.70203 38300 775
080 190 - Mid-Tex Gas Division Addition 080.70204 38000 5,545,613
080 190 - Mid-Tex Gas Division Addition 080.70205 38000 3,724,182
080 190 - Mid-Tex Gas Division Addition 080.70205 38300 983
080 190 - Mid-Tex Gas Division Addition 080.70206 38000 3,157,906
080 190 - Mid-Tex Gas Division Addition 080.70206 38300 1,196
080 190 - Mid-Tex Gas Division Addition 080.70207 38000 317,300
080 190 - Mid-Tex Gas Division Addition 080.70208 38000 1,890,367
080 190 - Mid-Tex Gas Division Addition 080.70209 38000 242,243
080 190 - Mid-Tex Gas Division Addition 080.70210 38000 9,376,752
080 190 - Mid-Tex Gas Division Addition 080.70211 37601 1,198,669
080 190 - Mid-Tex Gas Division Addition 080.70211 37602 803,236
080 190 - Mid-Tex Gas Division Addition 080.70212 37601 120,257
080 190 - Mid-Tex Gas Division Addition 080.70212 37602 4,710,078
MTX Additions by FERC
Page 54 of 101
452
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.70213 37601 3,315,619
080 190 - Mid-Tex Gas Division Addition 080.70213 37602 7,420,039
080 190 - Mid-Tex Gas Division Addition 080.70213 38300 30,869
080 190 - Mid-Tex Gas Division Addition 080.70214 37601 4,407,049
080 190 - Mid-Tex Gas Division Addition 080.70214 37602 3,532,099
080 190 - Mid-Tex Gas Division Addition 080.70215 37601 3,348,231
080 190 - Mid-Tex Gas Division Addition 080.70215 37602 1,071,736
080 190 - Mid-Tex Gas Division Addition 080.70215 38300 24,440
080 190 - Mid-Tex Gas Division Addition 080.70216 37601 1,364,510
080 190 - Mid-Tex Gas Division Addition 080.70216 37602 586,213
080 190 - Mid-Tex Gas Division Addition 080.70217 37601 2,928,347
080 190 - Mid-Tex Gas Division Addition 080.70217 37602 573,946
080 190 - Mid-Tex Gas Division Addition 080.70218 37601 367,943
080 190 - Mid-Tex Gas Division Addition 080.70218 37602 1,196,223
080 190 - Mid-Tex Gas Division Addition 080.70218 38100 65,459
080 190 - Mid-Tex Gas Division Addition 080.70218 38300 6,963
080 190 - Mid-Tex Gas Division Addition 080.70219 37601 1,147,090
080 190 - Mid-Tex Gas Division Addition 080.70219 37602 4,876,589
080 190 - Mid-Tex Gas Division Addition 080.70220 38000 4,605,053
080 190 - Mid-Tex Gas Division Addition 080.70220 38300 12,926
080 190 - Mid-Tex Gas Division Addition 080.70221 38000 3,985,311
080 190 - Mid-Tex Gas Division Addition 080.70221 38300 5,908
080 190 - Mid-Tex Gas Division Addition 080.70222 38000 9,045,998
080 190 - Mid-Tex Gas Division Addition 080.70222 38100 93,555
080 190 - Mid-Tex Gas Division Addition 080.70222 38300 18,177
080 190 - Mid-Tex Gas Division Addition 080.70223 38000 15,729,885
080 190 - Mid-Tex Gas Division Addition 080.70224 38000 3,855,462
080 190 - Mid-Tex Gas Division Addition 080.70224 38300 9,512
080 190 - Mid-Tex Gas Division Addition 080.70225 38000 2,523,550
080 190 - Mid-Tex Gas Division Addition 080.70226 38000 5,364,278
080 190 - Mid-Tex Gas Division Addition 080.70227 38000 2,204,967
080 190 - Mid-Tex Gas Division Addition 080.70228 38000 3,173,607
080 190 - Mid-Tex Gas Division Addition 080.70229 38100 1,730,993
080 190 - Mid-Tex Gas Division Addition 080.70229 38200 4,685,672
080 190 - Mid-Tex Gas Division Addition 080.70229 38300 15,938
080 190 - Mid-Tex Gas Division Addition 080.70230 38100 1,991,345
080 190 - Mid-Tex Gas Division Addition 080.70230 38200 4,522,637
080 190 - Mid-Tex Gas Division Addition 080.70230 38300 6,302
080 190 - Mid-Tex Gas Division Addition 080.70231 38100 1,492,562
080 190 - Mid-Tex Gas Division Addition 080.70231 38200 2,625,462
080 190 - Mid-Tex Gas Division Addition 080.70231 38300 1,916
080 190 - Mid-Tex Gas Division Addition 080.70232 38100 3,144,980
080 190 - Mid-Tex Gas Division Addition 080.70232 38200 9,360,259
080 190 - Mid-Tex Gas Division Addition 080.70232 38300 78,384
080 190 - Mid-Tex Gas Division Addition 080.70233 38100 1,294,274
080 190 - Mid-Tex Gas Division Addition 080.70233 38200 3,651,218
080 190 - Mid-Tex Gas Division Addition 080.70233 38300 42,750
080 190 - Mid-Tex Gas Division Addition 080.70234 38100 858,611
080 190 - Mid-Tex Gas Division Addition 080.70234 38200 2,008,935
080 190 - Mid-Tex Gas Division Addition 080.70234 38300 (9,196)
080 190 - Mid-Tex Gas Division Addition 080.70235 38100 1,423,102
080 190 - Mid-Tex Gas Division Addition 080.70235 38200 3,649,708
080 190 - Mid-Tex Gas Division Addition 080.70235 38300 1,104
080 190 - Mid-Tex Gas Division Addition 080.70236 38100 1,387,893
080 190 - Mid-Tex Gas Division Addition 080.70236 38200 1,515,479
080 190 - Mid-Tex Gas Division Addition 080.70236 38300 1,152,918
080 190 - Mid-Tex Gas Division Addition 080.70237 38100 1,026,704
080 190 - Mid-Tex Gas Division Addition 080.70237 38200 2,574,045
080 190 - Mid-Tex Gas Division Addition 080.70237 38300 9,713
080 190 - Mid-Tex Gas Division Addition 080.70249 37602 3,362
080 190 - Mid-Tex Gas Division Addition 080.70249 37800 7,845
080 190 - Mid-Tex Gas Division Addition 080.70252 37602 3,915
080 190 - Mid-Tex Gas Division Addition 080.70252 38000 859
080 190 - Mid-Tex Gas Division Addition 080.70254 37602 6,606
080 190 - Mid-Tex Gas Division Addition 080.70254 38000 734
080 190 - Mid-Tex Gas Division Addition 080.70256 37602 2,011
080 190 - Mid-Tex Gas Division Addition 080.70258 37602 5,584
080 190 - Mid-Tex Gas Division Addition 080.70258 38000 1,396
080 190 - Mid-Tex Gas Division Addition 080.70259 37602 445
080 190 - Mid-Tex Gas Division Addition 080.70259 37800 21,827
080 190 - Mid-Tex Gas Division Addition 080.70260 37602 7,458
080 190 - Mid-Tex Gas Division Addition 080.70260 37800 7,458
080 190 - Mid-Tex Gas Division Addition 080.70260 38000 1,657
080 190 - Mid-Tex Gas Division Addition 080.70268 37602 2,618
080 190 - Mid-Tex Gas Division Addition 080.70272 37602 19,780
080 190 - Mid-Tex Gas Division Addition 080.70274 37601 15,926
080 190 - Mid-Tex Gas Division Addition 080.70275 37602 4,134
080 190 - Mid-Tex Gas Division Addition 080.70277 37601 18,937
080 190 - Mid-Tex Gas Division Addition 080.70285 37800 44
080 190 - Mid-Tex Gas Division Addition 080.70289 38000 8,387,690
080 190 - Mid-Tex Gas Division Addition 080.70290 38000 9,781,927
080 190 - Mid-Tex Gas Division Addition 080.70290 38300 24,844
080 190 - Mid-Tex Gas Division Addition 080.70291 38000 8,310,644
080 190 - Mid-Tex Gas Division Addition 080.70291 38300 4,477
080 190 - Mid-Tex Gas Division Addition 080.70292 38000 11,129,991
080 190 - Mid-Tex Gas Division Addition 080.70292 38100 359,791
080 190 - Mid-Tex Gas Division Addition 080.70292 38300 13,363
080 190 - Mid-Tex Gas Division Addition 080.70293 38000 4,594,617
080 190 - Mid-Tex Gas Division Addition 080.70294 38000 11,888,683
080 190 - Mid-Tex Gas Division Addition 080.70294 38100 29,557
080 190 - Mid-Tex Gas Division Addition 080.70294 38300 699
080 190 - Mid-Tex Gas Division Addition 080.70295 38000 10,077,022
080 190 - Mid-Tex Gas Division Addition 080.70296 38000 4,468,104
080 190 - Mid-Tex Gas Division Addition 080.70297 38000 1,897,312
080 190 - Mid-Tex Gas Division Addition 080.70298 38100 1,252,742
080 190 - Mid-Tex Gas Division Addition 080.70298 38200 2,185,208
080 190 - Mid-Tex Gas Division Addition 080.70298 38300 26,763
080 190 - Mid-Tex Gas Division Addition 080.70299 38100 1,773,207
080 190 - Mid-Tex Gas Division Addition 080.70299 38200 2,683,525
080 190 - Mid-Tex Gas Division Addition 080.70299 38300 30,345
080 190 - Mid-Tex Gas Division Addition 080.70300 38100 1,337,668
080 190 - Mid-Tex Gas Division Addition 080.70300 38200 2,185,097
080 190 - Mid-Tex Gas Division Addition 080.70300 38300 31,816
080 190 - Mid-Tex Gas Division Addition 080.70301 38100 867,346
080 190 - Mid-Tex Gas Division Addition 080.70301 38200 882,282
080 190 - Mid-Tex Gas Division Addition 080.70301 38300 54,550
080 190 - Mid-Tex Gas Division Addition 080.70302 38100 827,291
MTX Additions by FERC
Page 55 of 101
453
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.70302 38200 1,253,087
080 190 - Mid-Tex Gas Division Addition 080.70302 38300 25,653
080 190 - Mid-Tex Gas Division Addition 080.70303 38100 1,400,411
080 190 - Mid-Tex Gas Division Addition 080.70303 38200 2,955,043
080 190 - Mid-Tex Gas Division Addition 080.70303 38300 18,071
080 190 - Mid-Tex Gas Division Addition 080.70304 38100 1,113,851
080 190 - Mid-Tex Gas Division Addition 080.70304 38200 1,682,404
080 190 - Mid-Tex Gas Division Addition 080.70304 38300 22,600
080 190 - Mid-Tex Gas Division Addition 080.70305 38100 933,942
080 190 - Mid-Tex Gas Division Addition 080.70305 38200 514,403
080 190 - Mid-Tex Gas Division Addition 080.70305 38300 297,987
080 190 - Mid-Tex Gas Division Addition 080.70306 38100 299,589
080 190 - Mid-Tex Gas Division Addition 080.70306 38200 374,934
080 190 - Mid-Tex Gas Division Addition 080.70306 38300 16,760
080 190 - Mid-Tex Gas Division Addition 080.70307 38000 853,716
080 190 - Mid-Tex Gas Division Addition 080.70308 38000 1,215,332
080 190 - Mid-Tex Gas Division Addition 080.70308 38300 673
080 190 - Mid-Tex Gas Division Addition 080.70309 38000 1,844,031
080 190 - Mid-Tex Gas Division Addition 080.70309 38300 2,011
080 190 - Mid-Tex Gas Division Addition 080.70310 38000 359,719
080 190 - Mid-Tex Gas Division Addition 080.70311 38000 889,608
080 190 - Mid-Tex Gas Division Addition 080.70312 38000 576,280
080 190 - Mid-Tex Gas Division Addition 080.70313 38000 897,559
080 190 - Mid-Tex Gas Division Addition 080.70314 38000 1,058,094
080 190 - Mid-Tex Gas Division Addition 080.70314 38100 9,416
080 190 - Mid-Tex Gas Division Addition 080.70314 38300 1,107
080 190 - Mid-Tex Gas Division Addition 080.70315 38000 481,848
080 190 - Mid-Tex Gas Division Addition 080.70316 37601 439,839
080 190 - Mid-Tex Gas Division Addition 080.70316 37602 206,192
080 190 - Mid-Tex Gas Division Addition 080.70317 37601 622,223
080 190 - Mid-Tex Gas Division Addition 080.70317 37602 509,670
080 190 - Mid-Tex Gas Division Addition 080.70318 37601 383,054
080 190 - Mid-Tex Gas Division Addition 080.70318 37602 701,009
080 190 - Mid-Tex Gas Division Addition 080.70319 37601 292,774
080 190 - Mid-Tex Gas Division Addition 080.70319 37602 79,195
080 190 - Mid-Tex Gas Division Addition 080.70320 37601 438,973
080 190 - Mid-Tex Gas Division Addition 080.70320 37602 193,939
080 190 - Mid-Tex Gas Division Addition 080.70321 37601 361,194
080 190 - Mid-Tex Gas Division Addition 080.70321 37602 31,587
080 190 - Mid-Tex Gas Division Addition 080.70322 37601 490,133
080 190 - Mid-Tex Gas Division Addition 080.70322 37602 143,272
080 190 - Mid-Tex Gas Division Addition 080.70323 37601 -
080 190 - Mid-Tex Gas Division Addition 080.70323 37602 640,455
080 190 - Mid-Tex Gas Division Addition 080.70324 37601 642,577
080 190 - Mid-Tex Gas Division Addition 080.70324 37602 20,578
080 190 - Mid-Tex Gas Division Addition 080.70325 38100 415,641
080 190 - Mid-Tex Gas Division Addition 080.70325 38200 1,217,411
080 190 - Mid-Tex Gas Division Addition 080.70325 38300 29,409
080 190 - Mid-Tex Gas Division Addition 080.70326 38100 427,335
080 190 - Mid-Tex Gas Division Addition 080.70326 38200 882,438
080 190 - Mid-Tex Gas Division Addition 080.70326 38300 11,833
080 190 - Mid-Tex Gas Division Addition 080.70327 38100 476,199
080 190 - Mid-Tex Gas Division Addition 080.70327 38200 1,609,255
080 190 - Mid-Tex Gas Division Addition 080.70327 38300 21,928
080 190 - Mid-Tex Gas Division Addition 080.70328 38100 386,512
080 190 - Mid-Tex Gas Division Addition 080.70328 38200 377,728
080 190 - Mid-Tex Gas Division Addition 080.70328 38300 9,385
080 190 - Mid-Tex Gas Division Addition 080.70329 38100 524,305
080 190 - Mid-Tex Gas Division Addition 080.70329 38200 845,338
080 190 - Mid-Tex Gas Division Addition 080.70329 38300 15,030
080 190 - Mid-Tex Gas Division Addition 080.70330 38100 214,945
080 190 - Mid-Tex Gas Division Addition 080.70330 38200 283,340
080 190 - Mid-Tex Gas Division Addition 080.70330 38300 5,990
080 190 - Mid-Tex Gas Division Addition 080.70331 38100 417,223
080 190 - Mid-Tex Gas Division Addition 080.70331 38200 755,741
080 190 - Mid-Tex Gas Division Addition 080.70331 38300 10,263
080 190 - Mid-Tex Gas Division Addition 080.70332 38100 392,515
080 190 - Mid-Tex Gas Division Addition 080.70332 38200 335,815
080 190 - Mid-Tex Gas Division Addition 080.70332 38300 172,152
080 190 - Mid-Tex Gas Division Addition 080.70333 38100 454,773
080 190 - Mid-Tex Gas Division Addition 080.70333 38200 1,058,443
080 190 - Mid-Tex Gas Division Addition 080.70333 38300 7,826
080 190 - Mid-Tex Gas Division Addition 080.70334 37600 1,167,247
080 190 - Mid-Tex Gas Division Addition 080.70335 37600 421,342
080 190 - Mid-Tex Gas Division Addition 080.70336 37600 2,319,101
080 190 - Mid-Tex Gas Division Addition 080.70337 37600 8,745,348
080 190 - Mid-Tex Gas Division Addition 080.70338 37600 1,571,867
080 190 - Mid-Tex Gas Division Addition 080.70339 37600 465,870
080 190 - Mid-Tex Gas Division Addition 080.70340 37600 1,309,290
080 190 - Mid-Tex Gas Division Addition 080.70341 37600 571,098
080 190 - Mid-Tex Gas Division Addition 080.70342 37600 1,547,412
080 190 - Mid-Tex Gas Division Addition 080.70343 37602 7,127
080 190 - Mid-Tex Gas Division Addition 080.70343 38000 455
080 190 - Mid-Tex Gas Division Addition 080.70344 37601 45,909
080 190 - Mid-Tex Gas Division Addition 080.70347 37602 (216)
080 190 - Mid-Tex Gas Division Addition 080.70350 37602 574,232
080 190 - Mid-Tex Gas Division Addition 080.70355 37601 47,960
080 190 - Mid-Tex Gas Division Addition 080.70361 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70377 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70379 37602 11,431
080 190 - Mid-Tex Gas Division Addition 080.70379 38000 2,858
080 190 - Mid-Tex Gas Division Addition 080.70384 37602 8,317
080 190 - Mid-Tex Gas Division Addition 080.70405 37601 128
080 190 - Mid-Tex Gas Division Addition 080.70405 37602 71,856
080 190 - Mid-Tex Gas Division Addition 080.70405 38000 10,384
080 190 - Mid-Tex Gas Division Addition 080.70406 37602 (164,925)
080 190 - Mid-Tex Gas Division Addition 080.70409 37602 912
080 190 - Mid-Tex Gas Division Addition 080.70412 38000 12,564
080 190 - Mid-Tex Gas Division Addition 080.70436 37602 10,500
080 190 - Mid-Tex Gas Division Addition 080.70436 38000 1,500
080 190 - Mid-Tex Gas Division Addition 080.70437 37602 (69)
080 190 - Mid-Tex Gas Division Addition 080.70438 37602 2,936
080 190 - Mid-Tex Gas Division Addition 080.70443 37602 (132)
080 190 - Mid-Tex Gas Division Addition 080.70444 37601 (62,295)
080 190 - Mid-Tex Gas Division Addition 080.70447 37602 29,909
080 190 - Mid-Tex Gas Division Addition 080.70447 38000 12,818
080 190 - Mid-Tex Gas Division Addition 080.70449 37800 1,780
MTX Additions by FERC
Page 56 of 101
454
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.70450 37602 670
080 190 - Mid-Tex Gas Division Addition 080.70455 37601 33,380
080 190 - Mid-Tex Gas Division Addition 080.70455 38000 1,757
080 190 - Mid-Tex Gas Division Addition 080.70462 37602 801
080 190 - Mid-Tex Gas Division Addition 080.70470 37800 1,181
080 190 - Mid-Tex Gas Division Addition 080.70473 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70475 37602 2,265
080 190 - Mid-Tex Gas Division Addition 080.70476 37602 4,530
080 190 - Mid-Tex Gas Division Addition 080.70476 37800 6,231
080 190 - Mid-Tex Gas Division Addition 080.70476 38000 566
080 190 - Mid-Tex Gas Division Addition 080.70477 37602 2,866
080 190 - Mid-Tex Gas Division Addition 080.70477 37800 2,865
080 190 - Mid-Tex Gas Division Addition 080.70478 37602 17,317
080 190 - Mid-Tex Gas Division Addition 080.70479 37602 3,536
080 190 - Mid-Tex Gas Division Addition 080.70479 37800 4,929
080 190 - Mid-Tex Gas Division Addition 080.70492 37602 84,617
080 190 - Mid-Tex Gas Division Addition 080.70492 38000 -
080 190 - Mid-Tex Gas Division Addition 080.70498 37602 4,704
080 190 - Mid-Tex Gas Division Addition 080.70498 38000 247
080 190 - Mid-Tex Gas Division Addition 080.70502 37602 11,770
080 190 - Mid-Tex Gas Division Addition 080.70504 37601 915
080 190 - Mid-Tex Gas Division Addition 080.70504 37602 14,643
080 190 - Mid-Tex Gas Division Addition 080.70504 38000 2,745
080 190 - Mid-Tex Gas Division Addition 080.70505 37602 4,969
080 190 - Mid-Tex Gas Division Addition 080.70511 37602 1,177
080 190 - Mid-Tex Gas Division Addition 080.70511 37800 2,118
080 190 - Mid-Tex Gas Division Addition 080.70512 37602 1,777
080 190 - Mid-Tex Gas Division Addition 080.70512 37800 4,147
080 190 - Mid-Tex Gas Division Addition 080.70515 37602 34,282
080 190 - Mid-Tex Gas Division Addition 080.70515 38000 3,391
080 190 - Mid-Tex Gas Division Addition 080.70520 37602 (25)
080 190 - Mid-Tex Gas Division Addition 080.70522 37602 6,344
080 190 - Mid-Tex Gas Division Addition 080.70523 37602 12,843
080 190 - Mid-Tex Gas Division Addition 080.70523 38000 3,211
080 190 - Mid-Tex Gas Division Addition 080.70524 37602 11,038
080 190 - Mid-Tex Gas Division Addition 080.70524 38000 2,759
080 190 - Mid-Tex Gas Division Addition 080.70526 37602 450
080 190 - Mid-Tex Gas Division Addition 080.70526 37800 2,248
080 190 - Mid-Tex Gas Division Addition 080.70526 38000 300
080 190 - Mid-Tex Gas Division Addition 080.70527 37602 1,289
080 190 - Mid-Tex Gas Division Addition 080.70527 37800 1,934
080 190 - Mid-Tex Gas Division Addition 080.70528 37602 3,682
080 190 - Mid-Tex Gas Division Addition 080.70528 37800 5,523
080 190 - Mid-Tex Gas Division Addition 080.70529 37602 2,982
080 190 - Mid-Tex Gas Division Addition 080.70529 38000 331
080 190 - Mid-Tex Gas Division Addition 080.70530 37602 743
080 190 - Mid-Tex Gas Division Addition 080.70530 37800 14,117
080 190 - Mid-Tex Gas Division Addition 080.70531 37602 430
080 190 - Mid-Tex Gas Division Addition 080.70531 37800 3,868
080 190 - Mid-Tex Gas Division Addition 080.70532 37602 895
080 190 - Mid-Tex Gas Division Addition 080.70532 37800 8,053
080 190 - Mid-Tex Gas Division Addition 080.70533 37602 2,751
080 190 - Mid-Tex Gas Division Addition 080.70533 37800 5,110
080 190 - Mid-Tex Gas Division Addition 080.70534 37602 7,123
080 190 - Mid-Tex Gas Division Addition 080.70534 37800 1,257
080 190 - Mid-Tex Gas Division Addition 080.70535 37602 2,845
080 190 - Mid-Tex Gas Division Addition 080.70535 37800 4,268
080 190 - Mid-Tex Gas Division Addition 080.70536 37602 3,723
080 190 - Mid-Tex Gas Division Addition 080.70536 37800 2,482
080 190 - Mid-Tex Gas Division Addition 080.70537 37602 7,093
080 190 - Mid-Tex Gas Division Addition 080.70537 37800 4,033
080 190 - Mid-Tex Gas Division Addition 080.70538 37602 16,492
080 190 - Mid-Tex Gas Division Addition 080.70538 38000 4,123
080 190 - Mid-Tex Gas Division Addition 080.70539 37602 4,928
080 190 - Mid-Tex Gas Division Addition 080.70539 37800 6,023
080 190 - Mid-Tex Gas Division Addition 080.70540 37602 5,402
080 190 - Mid-Tex Gas Division Addition 080.70540 37800 12,605
080 190 - Mid-Tex Gas Division Addition 080.70541 37602 46,893
080 190 - Mid-Tex Gas Division Addition 080.70541 38000 5,210
080 190 - Mid-Tex Gas Division Addition 080.70542 37602 2,769
080 190 - Mid-Tex Gas Division Addition 080.70542 37800 1,186
080 190 - Mid-Tex Gas Division Addition 080.70543 37602 828
080 190 - Mid-Tex Gas Division Addition 080.70543 37800 4,695
080 190 - Mid-Tex Gas Division Addition 080.70544 37602 1,369
080 190 - Mid-Tex Gas Division Addition 080.70544 37800 4,855
080 190 - Mid-Tex Gas Division Addition 080.70545 37602 1,580
080 190 - Mid-Tex Gas Division Addition 080.70545 37800 3,687
080 190 - Mid-Tex Gas Division Addition 080.70546 37602 197,377
080 190 - Mid-Tex Gas Division Addition 080.70546 38000 21,931
080 190 - Mid-Tex Gas Division Addition 080.70547 37602 1,078
080 190 - Mid-Tex Gas Division Addition 080.70547 37800 3,233
080 190 - Mid-Tex Gas Division Addition 080.70548 37602 98,380
080 190 - Mid-Tex Gas Division Addition 080.70548 38000 10,931
080 190 - Mid-Tex Gas Division Addition 080.70549 37602 1,756
080 190 - Mid-Tex Gas Division Addition 080.70549 37800 3,262
080 190 - Mid-Tex Gas Division Addition 080.70551 37602 30,028
080 190 - Mid-Tex Gas Division Addition 080.70551 38000 3,337
080 190 - Mid-Tex Gas Division Addition 080.70552 37602 792
080 190 - Mid-Tex Gas Division Addition 080.70552 37800 3,129
080 190 - Mid-Tex Gas Division Addition 080.70552 38000 40
080 190 - Mid-Tex Gas Division Addition 080.70553 37602 4,279
080 190 - Mid-Tex Gas Division Addition 080.70553 37800 4,546
080 190 - Mid-Tex Gas Division Addition 080.70553 38000 89
080 190 - Mid-Tex Gas Division Addition 080.70554 37602 5,936
080 190 - Mid-Tex Gas Division Addition 080.70554 37800 5,564
080 190 - Mid-Tex Gas Division Addition 080.70554 38000 866
080 190 - Mid-Tex Gas Division Addition 080.70555 37602 14,746
080 190 - Mid-Tex Gas Division Addition 080.70555 38000 941
080 190 - Mid-Tex Gas Division Addition 080.70557 37602 10,639
080 190 - Mid-Tex Gas Division Addition 080.70557 38000 3,546
080 190 - Mid-Tex Gas Division Addition 080.70560 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70562 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70564 37602 31,888
080 190 - Mid-Tex Gas Division Addition 080.70564 38000 986
080 190 - Mid-Tex Gas Division Addition 080.70566 37602 22,197
080 190 - Mid-Tex Gas Division Addition 080.70566 38000 5,549
080 190 - Mid-Tex Gas Division Addition 080.70575 38000 6,291
MTX Additions by FERC
Page 57 of 101
455
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.70575 38500 6,044
080 190 - Mid-Tex Gas Division Addition 080.70576 37602 (123,592)
080 190 - Mid-Tex Gas Division Addition 080.70577 37602 452
080 190 - Mid-Tex Gas Division Addition 080.70582 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70583 37602 1,074
080 190 - Mid-Tex Gas Division Addition 080.70585 37602 679
080 190 - Mid-Tex Gas Division Addition 080.70587 37601 -
080 190 - Mid-Tex Gas Division Addition 080.70590 37602 (96,432)
080 190 - Mid-Tex Gas Division Addition 080.70594 37602 214
080 190 - Mid-Tex Gas Division Addition 080.70595 37600 62,126
080 190 - Mid-Tex Gas Division Addition 080.70595 37601 484,578
080 190 - Mid-Tex Gas Division Addition 080.70595 37602 323,055
080 190 - Mid-Tex Gas Division Addition 080.70595 37800 372,756
080 190 - Mid-Tex Gas Division Addition 080.70596 37602 37,539
080 190 - Mid-Tex Gas Division Addition 080.70597 37602 1,059
080 190 - Mid-Tex Gas Division Addition 080.70598 37602 152
080 190 - Mid-Tex Gas Division Addition 080.70599 37602 27,503
080 190 - Mid-Tex Gas Division Addition 080.70599 38000 4,854
080 190 - Mid-Tex Gas Division Addition 080.70602 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70602 38500 -
080 190 - Mid-Tex Gas Division Addition 080.70603 37602 183,703
080 190 - Mid-Tex Gas Division Addition 080.70605 37602 185,794
080 190 - Mid-Tex Gas Division Addition 080.70606 37602 15,022
080 190 - Mid-Tex Gas Division Addition 080.70606 38000 6,438
080 190 - Mid-Tex Gas Division Addition 080.70608 37602 9,759
080 190 - Mid-Tex Gas Division Addition 080.70610 37602 8,019
080 190 - Mid-Tex Gas Division Addition 080.70610 37800 2,005
080 190 - Mid-Tex Gas Division Addition 080.70611 37602 94,424
080 190 - Mid-Tex Gas Division Addition 080.70611 37800 94,424
080 190 - Mid-Tex Gas Division Addition 080.70612 37602 9,908
080 190 - Mid-Tex Gas Division Addition 080.70612 37800 1,524
080 190 - Mid-Tex Gas Division Addition 080.70612 38000 762
080 190 - Mid-Tex Gas Division Addition 080.70614 37602 4,952
080 190 - Mid-Tex Gas Division Addition 080.70614 37800 2,072
080 190 - Mid-Tex Gas Division Addition 080.70615 37602 4,719
080 190 - Mid-Tex Gas Division Addition 080.70615 37800 2,184
080 190 - Mid-Tex Gas Division Addition 080.70616 37602 2,797
080 190 - Mid-Tex Gas Division Addition 080.70616 37800 2,797
080 190 - Mid-Tex Gas Division Addition 080.70617 37602 8,957
080 190 - Mid-Tex Gas Division Addition 080.70617 37800 57
080 190 - Mid-Tex Gas Division Addition 080.70618 37602 84,833
080 190 - Mid-Tex Gas Division Addition 080.70618 37800 76,350
080 190 - Mid-Tex Gas Division Addition 080.70618 38000 8,483
080 190 - Mid-Tex Gas Division Addition 080.70619 37602 88,636
080 190 - Mid-Tex Gas Division Addition 080.70619 37800 40,909
080 190 - Mid-Tex Gas Division Addition 080.70619 38000 6,818
080 190 - Mid-Tex Gas Division Addition 080.70620 37602 127,164
080 190 - Mid-Tex Gas Division Addition 080.70620 37800 74,179
080 190 - Mid-Tex Gas Division Addition 080.70620 38000 10,597
080 190 - Mid-Tex Gas Division Addition 080.70625 38000 6,805
080 190 - Mid-Tex Gas Division Addition 080.70625 38500 6,538
080 190 - Mid-Tex Gas Division Addition 080.70630 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70633 37602 2,571
080 190 - Mid-Tex Gas Division Addition 080.70633 38000 286
080 190 - Mid-Tex Gas Division Addition 080.70636 37602 7,380
080 190 - Mid-Tex Gas Division Addition 080.70636 38000 821
080 190 - Mid-Tex Gas Division Addition 080.70638 37602 8,939
080 190 - Mid-Tex Gas Division Addition 080.70638 38000 2,980
080 190 - Mid-Tex Gas Division Addition 080.70639 37602 13,741
080 190 - Mid-Tex Gas Division Addition 080.70639 38000 3,435
080 190 - Mid-Tex Gas Division Addition 080.70643 37602 111,366
080 190 - Mid-Tex Gas Division Addition 080.70643 37800 91,117
080 190 - Mid-Tex Gas Division Addition 080.70644 37602 25,279
080 190 - Mid-Tex Gas Division Addition 080.70644 38000 2,809
080 190 - Mid-Tex Gas Division Addition 080.70650 37602 18,398
080 190 - Mid-Tex Gas Division Addition 080.70650 38000 3,246
080 190 - Mid-Tex Gas Division Addition 080.70655 37602 13,431
080 190 - Mid-Tex Gas Division Addition 080.70664 37602 508
080 190 - Mid-Tex Gas Division Addition 080.70678 37602 11,631
080 190 - Mid-Tex Gas Division Addition 080.70681 37602 242,142
080 190 - Mid-Tex Gas Division Addition 080.70683 37602 29,081
080 190 - Mid-Tex Gas Division Addition 080.70686 37602 719,017
080 190 - Mid-Tex Gas Division Addition 080.70686 38000 -
080 190 - Mid-Tex Gas Division Addition 080.70688 37602 180,119
080 190 - Mid-Tex Gas Division Addition 080.70691 38000 1,309
080 190 - Mid-Tex Gas Division Addition 080.70693 37602 9,652
080 190 - Mid-Tex Gas Division Addition 080.70693 38000 6,125
080 190 - Mid-Tex Gas Division Addition 080.70702 37602 25,261
080 190 - Mid-Tex Gas Division Addition 080.70702 38000 2,807
080 190 - Mid-Tex Gas Division Addition 080.70706 37602 3,300
080 190 - Mid-Tex Gas Division Addition 080.70706 37800 4,033
080 190 - Mid-Tex Gas Division Addition 080.70708 37602 2,285
080 190 - Mid-Tex Gas Division Addition 080.70711 37602 1,124
080 190 - Mid-Tex Gas Division Addition 080.70712 37601 2,568
080 190 - Mid-Tex Gas Division Addition 080.70712 37602 4,402
080 190 - Mid-Tex Gas Division Addition 080.70712 38000 367
080 190 - Mid-Tex Gas Division Addition 080.70722 37602 268
080 190 - Mid-Tex Gas Division Addition 080.70723 37602 3,364
080 190 - Mid-Tex Gas Division Addition 080.70725 37602 550
080 190 - Mid-Tex Gas Division Addition 080.70728 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70734 37601 449
080 190 - Mid-Tex Gas Division Addition 080.70734 37602 14,762
080 190 - Mid-Tex Gas Division Addition 080.70734 38000 7,224
080 190 - Mid-Tex Gas Division Addition 080.70735 37602 22,283
080 190 - Mid-Tex Gas Division Addition 080.70735 38000 3,383
080 190 - Mid-Tex Gas Division Addition 080.70739 37602 13,460
080 190 - Mid-Tex Gas Division Addition 080.70739 38000 831
080 190 - Mid-Tex Gas Division Addition 080.70741 37602 2,393
080 190 - Mid-Tex Gas Division Addition 080.70742 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70744 37602 1,228
080 190 - Mid-Tex Gas Division Addition 080.70746 37602 31,816
080 190 - Mid-Tex Gas Division Addition 080.70746 38000 13,635
080 190 - Mid-Tex Gas Division Addition 080.70750 37602 22,730
080 190 - Mid-Tex Gas Division Addition 080.70768 37602 363
080 190 - Mid-Tex Gas Division Addition 080.70787 37602 4,041
080 190 - Mid-Tex Gas Division Addition 080.70790 37602 561
080 190 - Mid-Tex Gas Division Addition 080.70796 37602 -
MTX Additions by FERC
Page 58 of 101
456
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.70797 37800 5,865
080 190 - Mid-Tex Gas Division Addition 080.70798 37602 1,208
080 190 - Mid-Tex Gas Division Addition 080.70798 37900 2,621
080 190 - Mid-Tex Gas Division Addition 080.70799 37602 5
080 190 - Mid-Tex Gas Division Addition 080.70806 37602 11,805
080 190 - Mid-Tex Gas Division Addition 080.70809 37602 3,304
080 190 - Mid-Tex Gas Division Addition 080.70810 37602 20,802
080 190 - Mid-Tex Gas Division Addition 080.70810 38000 2,311
080 190 - Mid-Tex Gas Division Addition 080.70816 37602 3,519
080 190 - Mid-Tex Gas Division Addition 080.70816 38000 185
080 190 - Mid-Tex Gas Division Addition 080.70817 37602 4
080 190 - Mid-Tex Gas Division Addition 080.70822 37601 95,266
080 190 - Mid-Tex Gas Division Addition 080.70824 37602 5,786
080 190 - Mid-Tex Gas Division Addition 080.70824 38000 58
080 190 - Mid-Tex Gas Division Addition 080.70826 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70831 37600 3,604
080 190 - Mid-Tex Gas Division Addition 080.70831 37601 10,813
080 190 - Mid-Tex Gas Division Addition 080.70835 37602 26,390
080 190 - Mid-Tex Gas Division Addition 080.70835 38000 6,597
080 190 - Mid-Tex Gas Division Addition 080.70837 37602 9,266
080 190 - Mid-Tex Gas Division Addition 080.70840 37602 28,487
080 190 - Mid-Tex Gas Division Addition 080.70840 38000 5,027
080 190 - Mid-Tex Gas Division Addition 080.70842 37602 7,584
080 190 - Mid-Tex Gas Division Addition 080.70842 38000 1,338
080 190 - Mid-Tex Gas Division Addition 080.70843 37602 11,348
080 190 - Mid-Tex Gas Division Addition 080.70843 38000 596
080 190 - Mid-Tex Gas Division Addition 080.70848 37602 (92)
080 190 - Mid-Tex Gas Division Addition 080.70849 37601 7,867
080 190 - Mid-Tex Gas Division Addition 080.70850 37602 156
080 190 - Mid-Tex Gas Division Addition 080.70855 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70855 38000 -
080 190 - Mid-Tex Gas Division Addition 080.70857 37602 23,496
080 190 - Mid-Tex Gas Division Addition 080.70857 38000 3,511
080 190 - Mid-Tex Gas Division Addition 080.70859 37602 5,016
080 190 - Mid-Tex Gas Division Addition 080.70865 39906 -
080 190 - Mid-Tex Gas Division Addition 080.70867 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70868 37602 7,883
080 190 - Mid-Tex Gas Division Addition 080.70871 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70873 37602 5,558
080 190 - Mid-Tex Gas Division Addition 080.70873 38000 1,390
080 190 - Mid-Tex Gas Division Addition 080.70875 37602 5,527
080 190 - Mid-Tex Gas Division Addition 080.70875 38000 614
080 190 - Mid-Tex Gas Division Addition 080.70876 37602 71,294
080 190 - Mid-Tex Gas Division Addition 080.70884 38300 7,575
080 190 - Mid-Tex Gas Division Addition 080.70892 37602 3,457
080 190 - Mid-Tex Gas Division Addition 080.70894 37600 231
080 190 - Mid-Tex Gas Division Addition 080.70894 37601 22,839
080 190 - Mid-Tex Gas Division Addition 080.70897 37601 4,037
080 190 - Mid-Tex Gas Division Addition 080.70897 37602 22,879
080 190 - Mid-Tex Gas Division Addition 080.70899 37602 20,128
080 190 - Mid-Tex Gas Division Addition 080.70899 38000 6,444
080 190 - Mid-Tex Gas Division Addition 080.70903 37602 2,706
080 190 - Mid-Tex Gas Division Addition 080.70903 37800 5,413
080 190 - Mid-Tex Gas Division Addition 080.70907 37602 857
080 190 - Mid-Tex Gas Division Addition 080.70914 37602 340,979
080 190 - Mid-Tex Gas Division Addition 080.70923 37602 5,022
080 190 - Mid-Tex Gas Division Addition 080.70923 37800 5,692
080 190 - Mid-Tex Gas Division Addition 080.70926 37602 2,944
080 190 - Mid-Tex Gas Division Addition 080.70926 37800 2,031
080 190 - Mid-Tex Gas Division Addition 080.70927 37602 69,785
080 190 - Mid-Tex Gas Division Addition 080.70927 38000 17,446
080 190 - Mid-Tex Gas Division Addition 080.70935 37601 65,754
080 190 - Mid-Tex Gas Division Addition 080.70936 37601 108
080 190 - Mid-Tex Gas Division Addition 080.70936 37602 8,079
080 190 - Mid-Tex Gas Division Addition 080.70936 37800 2,358
080 190 - Mid-Tex Gas Division Addition 080.70936 38000 734
080 190 - Mid-Tex Gas Division Addition 080.70938 37601 329,113
080 190 - Mid-Tex Gas Division Addition 080.70938 37800 8,773
080 190 - Mid-Tex Gas Division Addition 080.70949 37602 18,703
080 190 - Mid-Tex Gas Division Addition 080.70952 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70954 37601 -
080 190 - Mid-Tex Gas Division Addition 080.70954 38500 -
080 190 - Mid-Tex Gas Division Addition 080.70958 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70962 37602 25,774
080 190 - Mid-Tex Gas Division Addition 080.70965 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70968 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70979 37602 30,997
080 190 - Mid-Tex Gas Division Addition 080.70981 37602 3
080 190 - Mid-Tex Gas Division Addition 080.70984 37602 24,638
080 190 - Mid-Tex Gas Division Addition 080.70984 38000 762
080 190 - Mid-Tex Gas Division Addition 080.70985 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70990 37602 -
080 190 - Mid-Tex Gas Division Addition 080.70996 37602 229,880
080 190 - Mid-Tex Gas Division Addition 080.70998 37602 22,728
080 190 - Mid-Tex Gas Division Addition 080.70998 38000 230
080 190 - Mid-Tex Gas Division Addition 080.70999 37602 14,245
080 190 - Mid-Tex Gas Division Addition 080.71000 37602 9,453
080 190 - Mid-Tex Gas Division Addition 080.71000 38000 2,363
080 190 - Mid-Tex Gas Division Addition 080.71001 37602 607
080 190 - Mid-Tex Gas Division Addition 080.71011 37602 47,145
080 190 - Mid-Tex Gas Division Addition 080.71011 38000 5,238
080 190 - Mid-Tex Gas Division Addition 080.71014 37800 4,485
080 190 - Mid-Tex Gas Division Addition 080.71015 37602 7,289
080 190 - Mid-Tex Gas Division Addition 080.71018 37602 37,851
080 190 - Mid-Tex Gas Division Addition 080.71018 38000 7,210
080 190 - Mid-Tex Gas Division Addition 080.71019 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71021 37602 7,113
080 190 - Mid-Tex Gas Division Addition 080.71021 38000 790
080 190 - Mid-Tex Gas Division Addition 080.71028 37602 4,498
080 190 - Mid-Tex Gas Division Addition 080.71028 38000 1,124
080 190 - Mid-Tex Gas Division Addition 080.71030 37800 13,568
080 190 - Mid-Tex Gas Division Addition 080.71031 37602 151,072
080 190 - Mid-Tex Gas Division Addition 080.71031 38000 26,660
080 190 - Mid-Tex Gas Division Addition 080.71033 37602 4,163
080 190 - Mid-Tex Gas Division Addition 080.71035 37602 9,965
080 190 - Mid-Tex Gas Division Addition 080.71036 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71039 37602 55,245
MTX Additions by FERC
Page 59 of 101
457
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.71043 37601 693,900
080 190 - Mid-Tex Gas Division Addition 080.71043 37800 77,100
080 190 - Mid-Tex Gas Division Addition 080.71044 38000 7,056
080 190 - Mid-Tex Gas Division Addition 080.71045 38000 14,378
080 190 - Mid-Tex Gas Division Addition 080.71045 38500 4,793
080 190 - Mid-Tex Gas Division Addition 080.71046 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71050 37602 1,788
080 190 - Mid-Tex Gas Division Addition 080.71066 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71070 37602 1,589
080 190 - Mid-Tex Gas Division Addition 080.71079 37602 6,379
080 190 - Mid-Tex Gas Division Addition 080.71081 37602 3,312
080 190 - Mid-Tex Gas Division Addition 080.71081 38000 828
080 190 - Mid-Tex Gas Division Addition 080.71082 37602 22,865
080 190 - Mid-Tex Gas Division Addition 080.71082 38000 2,540
080 190 - Mid-Tex Gas Division Addition 080.71084 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71085 37602 (6,460)
080 190 - Mid-Tex Gas Division Addition 080.71085 38500 (1,140)
080 190 - Mid-Tex Gas Division Addition 080.71090 37601 175
080 190 - Mid-Tex Gas Division Addition 080.71090 37602 3,326
080 190 - Mid-Tex Gas Division Addition 080.71091 37602 20,578
080 190 - Mid-Tex Gas Division Addition 080.71091 38000 1,083
080 190 - Mid-Tex Gas Division Addition 080.71092 37602 412
080 190 - Mid-Tex Gas Division Addition 080.71094 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71095 37602 (140)
080 190 - Mid-Tex Gas Division Addition 080.71098 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71099 37602 13,154
080 190 - Mid-Tex Gas Division Addition 080.71099 38000 692
080 190 - Mid-Tex Gas Division Addition 080.71100 37601 (42,989)
080 190 - Mid-Tex Gas Division Addition 080.71100 37800 (43,293)
080 190 - Mid-Tex Gas Division Addition 080.71102 37602 4,418
080 190 - Mid-Tex Gas Division Addition 080.71105 37602 2,916
080 190 - Mid-Tex Gas Division Addition 080.71105 38000 324
080 190 - Mid-Tex Gas Division Addition 080.71107 37602 7,950
080 190 - Mid-Tex Gas Division Addition 080.71109 37602 32,517
080 190 - Mid-Tex Gas Division Addition 080.71109 38000 4,434
080 190 - Mid-Tex Gas Division Addition 080.71114 37602 1,372
080 190 - Mid-Tex Gas Division Addition 080.71116 37602 13,990
080 190 - Mid-Tex Gas Division Addition 080.71119 37602 20,146
080 190 - Mid-Tex Gas Division Addition 080.71119 38000 623
080 190 - Mid-Tex Gas Division Addition 080.71121 37602 4,555
080 190 - Mid-Tex Gas Division Addition 080.71124 37602 6,118
080 190 - Mid-Tex Gas Division Addition 080.71124 38000 680
080 190 - Mid-Tex Gas Division Addition 080.71126 37602 87,414
080 190 - Mid-Tex Gas Division Addition 080.71128 37602 267
080 190 - Mid-Tex Gas Division Addition 080.71129 37602 (221,723)
080 190 - Mid-Tex Gas Division Addition 080.71129 38000 (24,636)
080 190 - Mid-Tex Gas Division Addition 080.71130 37602 63,532
080 190 - Mid-Tex Gas Division Addition 080.71134 37602 12,924
080 190 - Mid-Tex Gas Division Addition 080.71134 38000 5,539
080 190 - Mid-Tex Gas Division Addition 080.71143 37602 7,747
080 190 - Mid-Tex Gas Division Addition 080.71143 38000 7,151
080 190 - Mid-Tex Gas Division Addition 080.71145 37602 7,360
080 190 - Mid-Tex Gas Division Addition 080.71148 37602 18,111
080 190 - Mid-Tex Gas Division Addition 080.71148 38000 1,363
080 190 - Mid-Tex Gas Division Addition 080.71150 37602 3,601
080 190 - Mid-Tex Gas Division Addition 080.71155 37602 24,219
080 190 - Mid-Tex Gas Division Addition 080.71155 38000 11,788
080 190 - Mid-Tex Gas Division Addition 080.71163 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71165 37602 13,377
080 190 - Mid-Tex Gas Division Addition 080.71165 38000 4,459
080 190 - Mid-Tex Gas Division Addition 080.71168 37602 (31,492)
080 190 - Mid-Tex Gas Division Addition 080.71170 37602 2,781
080 190 - Mid-Tex Gas Division Addition 080.71170 38000 4,171
080 190 - Mid-Tex Gas Division Addition 080.71172 37602 507
080 190 - Mid-Tex Gas Division Addition 080.71173 37602 17,141
080 190 - Mid-Tex Gas Division Addition 080.71173 38000 7,346
080 190 - Mid-Tex Gas Division Addition 080.71174 37602 (13,814)
080 190 - Mid-Tex Gas Division Addition 080.71177 37602 1,633,207
080 190 - Mid-Tex Gas Division Addition 080.71177 38000 244,042
080 190 - Mid-Tex Gas Division Addition 080.71185 37602 7,789
080 190 - Mid-Tex Gas Division Addition 080.71185 38000 410
080 190 - Mid-Tex Gas Division Addition 080.71189 37602 8,395
080 190 - Mid-Tex Gas Division Addition 080.71192 37602 9,277
080 190 - Mid-Tex Gas Division Addition 080.71192 38000 2,319
080 190 - Mid-Tex Gas Division Addition 080.71211 37602 66,434
080 190 - Mid-Tex Gas Division Addition 080.71214 37602 10,250
080 190 - Mid-Tex Gas Division Addition 080.71214 38000 1,139
080 190 - Mid-Tex Gas Division Addition 080.71222 37602 54,442
080 190 - Mid-Tex Gas Division Addition 080.71223 37602 5,106
080 190 - Mid-Tex Gas Division Addition 080.71224 37602 41,518
080 190 - Mid-Tex Gas Division Addition 080.71224 38000 1,284
080 190 - Mid-Tex Gas Division Addition 080.71235 37602 305,643
080 190 - Mid-Tex Gas Division Addition 080.71236 37602 1,047,387
080 190 - Mid-Tex Gas Division Addition 080.71237 37602 484
080 190 - Mid-Tex Gas Division Addition 080.71238 37602 49
080 190 - Mid-Tex Gas Division Addition 080.71239 37602 8,109
080 190 - Mid-Tex Gas Division Addition 080.71240 37602 507
080 190 - Mid-Tex Gas Division Addition 080.71247 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71250 37602 15,980
080 190 - Mid-Tex Gas Division Addition 080.71251 37602 177,189
080 190 - Mid-Tex Gas Division Addition 080.71254 37602 13,150
080 190 - Mid-Tex Gas Division Addition 080.71255 37601 178,373
080 190 - Mid-Tex Gas Division Addition 080.71263 37602 6,998
080 190 - Mid-Tex Gas Division Addition 080.71267 37602 5,265
080 190 - Mid-Tex Gas Division Addition 080.71271 37602 30,324
080 190 - Mid-Tex Gas Division Addition 080.71274 37602 12,761
080 190 - Mid-Tex Gas Division Addition 080.71274 38000 4,254
080 190 - Mid-Tex Gas Division Addition 080.71276 37601 111,718
080 190 - Mid-Tex Gas Division Addition 080.71278 37602 20,348
080 190 - Mid-Tex Gas Division Addition 080.71278 38000 2,261
080 190 - Mid-Tex Gas Division Addition 080.71284 37602 26,424
080 190 - Mid-Tex Gas Division Addition 080.71284 38000 (20,881)
080 190 - Mid-Tex Gas Division Addition 080.71285 37602 3,839
080 190 - Mid-Tex Gas Division Addition 080.71285 37800 8,956
080 190 - Mid-Tex Gas Division Addition 080.71294 37602 15,782
080 190 - Mid-Tex Gas Division Addition 080.71294 38000 5,261
080 190 - Mid-Tex Gas Division Addition 080.71302 37602 7,499
MTX Additions by FERC
Page 60 of 101
458
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.71302 38000 395
080 190 - Mid-Tex Gas Division Addition 080.71303 37602 10,762
080 190 - Mid-Tex Gas Division Addition 080.71303 38000 566
080 190 - Mid-Tex Gas Division Addition 080.71304 37602 3,507,303
080 190 - Mid-Tex Gas Division Addition 080.71304 38000 263,991
080 190 - Mid-Tex Gas Division Addition 080.71305 37602 4,223
080 190 - Mid-Tex Gas Division Addition 080.71313 38000 (5,306)
080 190 - Mid-Tex Gas Division Addition 080.71314 37602 988
080 190 - Mid-Tex Gas Division Addition 080.71321 37602 14,319
080 190 - Mid-Tex Gas Division Addition 080.71321 38000 1,591
080 190 - Mid-Tex Gas Division Addition 080.71322 38000 86,423
080 190 - Mid-Tex Gas Division Addition 080.71323 38000 61,876
080 190 - Mid-Tex Gas Division Addition 080.71324 38000 45,574
080 190 - Mid-Tex Gas Division Addition 080.71325 37602 1,045
080 190 - Mid-Tex Gas Division Addition 080.71329 37601 6,098
080 190 - Mid-Tex Gas Division Addition 080.71329 37602 5,807
080 190 - Mid-Tex Gas Division Addition 080.71329 37800 1,161
080 190 - Mid-Tex Gas Division Addition 080.71332 37602 10,652
080 190 - Mid-Tex Gas Division Addition 080.71332 38000 42,610
080 190 - Mid-Tex Gas Division Addition 080.71333 38000 37,877
080 190 - Mid-Tex Gas Division Addition 080.71336 38000 67,498
080 190 - Mid-Tex Gas Division Addition 080.71337 37602 8,322
080 190 - Mid-Tex Gas Division Addition 080.71342 37602 4,637
080 190 - Mid-Tex Gas Division Addition 080.71343 37602 2,427
080 190 - Mid-Tex Gas Division Addition 080.71343 38000 74
080 190 - Mid-Tex Gas Division Addition 080.71344 37601 5,992
080 190 - Mid-Tex Gas Division Addition 080.71344 37602 2,568
080 190 - Mid-Tex Gas Division Addition 080.71344 37800 856
080 190 - Mid-Tex Gas Division Addition 080.71346 37601 2,243
080 190 - Mid-Tex Gas Division Addition 080.71346 37602 4,486
080 190 - Mid-Tex Gas Division Addition 080.71346 37800 2,243
080 190 - Mid-Tex Gas Division Addition 080.71348 37602 2,224
080 190 - Mid-Tex Gas Division Addition 080.71348 37800 1,846
080 190 - Mid-Tex Gas Division Addition 080.71349 37602 6,191
080 190 - Mid-Tex Gas Division Addition 080.71350 37602 1,692
080 190 - Mid-Tex Gas Division Addition 080.71350 37800 3,385
080 190 - Mid-Tex Gas Division Addition 080.71351 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71352 37800 6,546
080 190 - Mid-Tex Gas Division Addition 080.71353 37602 88,032
080 190 - Mid-Tex Gas Division Addition 080.71359 37602 3,864
080 190 - Mid-Tex Gas Division Addition 080.71359 37800 5,313
080 190 - Mid-Tex Gas Division Addition 080.71359 38000 483
080 190 - Mid-Tex Gas Division Addition 080.71365 37602 8,514
080 190 - Mid-Tex Gas Division Addition 080.71367 37602 10,863
080 190 - Mid-Tex Gas Division Addition 080.71367 38000 1,917
080 190 - Mid-Tex Gas Division Addition 080.71368 37602 9,653
080 190 - Mid-Tex Gas Division Addition 080.71368 38000 1,704
080 190 - Mid-Tex Gas Division Addition 080.71369 37602 17,877
080 190 - Mid-Tex Gas Division Addition 080.71369 38000 3,155
080 190 - Mid-Tex Gas Division Addition 080.71380 37602 31,752
080 190 - Mid-Tex Gas Division Addition 080.71381 37602 206
080 190 - Mid-Tex Gas Division Addition 080.71386 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71387 37602 403,127
080 190 - Mid-Tex Gas Division Addition 080.71387 38000 71,140
080 190 - Mid-Tex Gas Division Addition 080.71388 37601 25,730
080 190 - Mid-Tex Gas Division Addition 080.71389 37602 1,513
080 190 - Mid-Tex Gas Division Addition 080.71389 37800 2,118
080 190 - Mid-Tex Gas Division Addition 080.71390 37602 4
080 190 - Mid-Tex Gas Division Addition 080.71391 37602 8,328
080 190 - Mid-Tex Gas Division Addition 080.71391 38000 438
080 190 - Mid-Tex Gas Division Addition 080.71393 37602 3,447
080 190 - Mid-Tex Gas Division Addition 080.71395 37602 6,680
080 190 - Mid-Tex Gas Division Addition 080.71395 38000 6,680
080 190 - Mid-Tex Gas Division Addition 080.71397 37602 11,123
080 190 - Mid-Tex Gas Division Addition 080.71397 38000 2,781
080 190 - Mid-Tex Gas Division Addition 080.71401 37602 641
080 190 - Mid-Tex Gas Division Addition 080.71403 37602 2,688
080 190 - Mid-Tex Gas Division Addition 080.71403 37800 3,046
080 190 - Mid-Tex Gas Division Addition 080.71404 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71408 37602 21,284
080 190 - Mid-Tex Gas Division Addition 080.71408 38000 7,094
080 190 - Mid-Tex Gas Division Addition 080.71409 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71412 37602 314,377
080 190 - Mid-Tex Gas Division Addition 080.71412 38000 34,931
080 190 - Mid-Tex Gas Division Addition 080.71416 37602 46,916
080 190 - Mid-Tex Gas Division Addition 080.71416 38000 2,469
080 190 - Mid-Tex Gas Division Addition 080.71417 37602 1,991
080 190 - Mid-Tex Gas Division Addition 080.71417 37800 2,472
080 190 - Mid-Tex Gas Division Addition 080.71420 38000 1,807
080 190 - Mid-Tex Gas Division Addition 080.71423 37602 8,630
080 190 - Mid-Tex Gas Division Addition 080.71423 38000 454
080 190 - Mid-Tex Gas Division Addition 080.71425 37602 10,175
080 190 - Mid-Tex Gas Division Addition 080.71425 38000 536
080 190 - Mid-Tex Gas Division Addition 080.71426 37602 2,107
080 190 - Mid-Tex Gas Division Addition 080.71426 37800 2,388
080 190 - Mid-Tex Gas Division Addition 080.71427 37602 10,138
080 190 - Mid-Tex Gas Division Addition 080.71427 38000 2,535
080 190 - Mid-Tex Gas Division Addition 080.71429 37601 -
080 190 - Mid-Tex Gas Division Addition 080.71429 37602 374,471
080 190 - Mid-Tex Gas Division Addition 080.71429 38000 -
080 190 - Mid-Tex Gas Division Addition 080.71431 37800 2,745
080 190 - Mid-Tex Gas Division Addition 080.71436 37602 933
080 190 - Mid-Tex Gas Division Addition 080.71438 37602 17,009
080 190 - Mid-Tex Gas Division Addition 080.71438 38000 1,890
080 190 - Mid-Tex Gas Division Addition 080.71441 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71442 37602 36,128
080 190 - Mid-Tex Gas Division Addition 080.71442 38000 6,376
080 190 - Mid-Tex Gas Division Addition 080.71443 37602 6,388
080 190 - Mid-Tex Gas Division Addition 080.71445 37800 1,287
080 190 - Mid-Tex Gas Division Addition 080.71449 37602 3,959
080 190 - Mid-Tex Gas Division Addition 080.71449 38000 1,320
080 190 - Mid-Tex Gas Division Addition 080.71460 37602 358,625
080 190 - Mid-Tex Gas Division Addition 080.71462 37602 133,391
080 190 - Mid-Tex Gas Division Addition 080.71463 37602 200,060
080 190 - Mid-Tex Gas Division Addition 080.71464 37602 119,430
080 190 - Mid-Tex Gas Division Addition 080.71467 37602 208,498
080 190 - Mid-Tex Gas Division Addition 080.71467 37800 6,950
MTX Additions by FERC
Page 61 of 101
459
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.71467 38000 132,049
080 190 - Mid-Tex Gas Division Addition 080.71471 37602 3,100
080 190 - Mid-Tex Gas Division Addition 080.71471 37800 3,100
080 190 - Mid-Tex Gas Division Addition 080.71472 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71476 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71478 37602 3
080 190 - Mid-Tex Gas Division Addition 080.71479 37602 28,704
080 190 - Mid-Tex Gas Division Addition 080.71484 37601 2,926
080 190 - Mid-Tex Gas Division Addition 080.71484 37602 1,463
080 190 - Mid-Tex Gas Division Addition 080.71484 37800 2,195
080 190 - Mid-Tex Gas Division Addition 080.71485 37600 18,197
080 190 - Mid-Tex Gas Division Addition 080.71486 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71489 37602 3,067
080 190 - Mid-Tex Gas Division Addition 080.71489 37800 3,067
080 190 - Mid-Tex Gas Division Addition 080.71494 37601 276
080 190 - Mid-Tex Gas Division Addition 080.71494 37602 551
080 190 - Mid-Tex Gas Division Addition 080.71494 37800 2,206
080 190 - Mid-Tex Gas Division Addition 080.71496 37601 47,133
080 190 - Mid-Tex Gas Division Addition 080.71499 37602 2,031
080 190 - Mid-Tex Gas Division Addition 080.71499 37800 2,709
080 190 - Mid-Tex Gas Division Addition 080.71509 39906 -
080 190 - Mid-Tex Gas Division Addition 080.71514 37602 17,533
080 190 - Mid-Tex Gas Division Addition 080.71514 38000 731
080 190 - Mid-Tex Gas Division Addition 080.71516 37601 785
080 190 - Mid-Tex Gas Division Addition 080.71516 37602 1,571
080 190 - Mid-Tex Gas Division Addition 080.71516 37800 1,812
080 190 - Mid-Tex Gas Division Addition 080.71517 37602 27,809
080 190 - Mid-Tex Gas Division Addition 080.71517 38000 1,464
080 190 - Mid-Tex Gas Division Addition 080.71518 37602 180,496
080 190 - Mid-Tex Gas Division Addition 080.71519 37602 153,596
080 190 - Mid-Tex Gas Division Addition 080.71521 37602 249,643
080 190 - Mid-Tex Gas Division Addition 080.71522 37602 117,775
080 190 - Mid-Tex Gas Division Addition 080.71522 37800 232,169
080 190 - Mid-Tex Gas Division Addition 080.71523 37601 838
080 190 - Mid-Tex Gas Division Addition 080.71523 37602 2,514
080 190 - Mid-Tex Gas Division Addition 080.71523 37800 3,247
080 190 - Mid-Tex Gas Division Addition 080.71527 37602 801
080 190 - Mid-Tex Gas Division Addition 080.71528 37602 19,872
080 190 - Mid-Tex Gas Division Addition 080.71528 38000 4,968
080 190 - Mid-Tex Gas Division Addition 080.71529 37602 2,012
080 190 - Mid-Tex Gas Division Addition 080.71529 37800 2,952
080 190 - Mid-Tex Gas Division Addition 080.71530 37602 3,720
080 190 - Mid-Tex Gas Division Addition 080.71531 37602 1,172
080 190 - Mid-Tex Gas Division Addition 080.71531 37800 3,515
080 190 - Mid-Tex Gas Division Addition 080.71534 37602 46,529
080 190 - Mid-Tex Gas Division Addition 080.71534 38000 5,751
080 190 - Mid-Tex Gas Division Addition 080.71539 37601 313,883
080 190 - Mid-Tex Gas Division Addition 080.71540 37800 35,762
080 190 - Mid-Tex Gas Division Addition 080.71547 37602 1,446
080 190 - Mid-Tex Gas Division Addition 080.71553 37602 14
080 190 - Mid-Tex Gas Division Addition 080.71554 37602 (11)
080 190 - Mid-Tex Gas Division Addition 080.71554 38000 (4)
080 190 - Mid-Tex Gas Division Addition 080.71555 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71556 37602 3,283
080 190 - Mid-Tex Gas Division Addition 080.71557 37602 80
080 190 - Mid-Tex Gas Division Addition 080.71560 37602 289,348
080 190 - Mid-Tex Gas Division Addition 080.71561 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71563 37602 6,598
080 190 - Mid-Tex Gas Division Addition 080.71564 37602 (412)
080 190 - Mid-Tex Gas Division Addition 080.71567 37602 70,342
080 190 - Mid-Tex Gas Division Addition 080.71570 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71571 37602 416
080 190 - Mid-Tex Gas Division Addition 080.71578 39000 4,709
080 190 - Mid-Tex Gas Division Addition 080.71578 39800 4,272
080 190 - Mid-Tex Gas Division Addition 080.71578 39903 1,244
080 190 - Mid-Tex Gas Division Addition 080.71579 37800 8,542
080 190 - Mid-Tex Gas Division Addition 080.71581 37602 841
080 190 - Mid-Tex Gas Division Addition 080.71584 37600 4,960
080 190 - Mid-Tex Gas Division Addition 080.71584 37602 14,879
080 190 - Mid-Tex Gas Division Addition 080.71585 37602 961
080 190 - Mid-Tex Gas Division Addition 080.71588 37602 366
080 190 - Mid-Tex Gas Division Addition 080.71589 37602 4,588
080 190 - Mid-Tex Gas Division Addition 080.71589 37800 139
080 190 - Mid-Tex Gas Division Addition 080.71591 37602 3,790
080 190 - Mid-Tex Gas Division Addition 080.71591 38000 200
080 190 - Mid-Tex Gas Division Addition 080.71592 37602 25,568
080 190 - Mid-Tex Gas Division Addition 080.71592 38000 258
080 190 - Mid-Tex Gas Division Addition 080.71593 37602 9,139
080 190 - Mid-Tex Gas Division Addition 080.71594 37602 239
080 190 - Mid-Tex Gas Division Addition 080.71600 37602 281,014
080 190 - Mid-Tex Gas Division Addition 080.71601 37602 4,507
080 190 - Mid-Tex Gas Division Addition 080.71601 38000 237
080 190 - Mid-Tex Gas Division Addition 080.71607 37602 25,326
080 190 - Mid-Tex Gas Division Addition 080.71607 38000 3,784
080 190 - Mid-Tex Gas Division Addition 080.71611 37602 160
080 190 - Mid-Tex Gas Division Addition 080.71620 37602 119,997
080 190 - Mid-Tex Gas Division Addition 080.71622 37602 12,116
080 190 - Mid-Tex Gas Division Addition 080.71622 38000 1,346
080 190 - Mid-Tex Gas Division Addition 080.71627 37800 -
080 190 - Mid-Tex Gas Division Addition 080.71627 38000 56
080 190 - Mid-Tex Gas Division Addition 080.71627 38500 3,083
080 190 - Mid-Tex Gas Division Addition 080.71632 37602 11,653
080 190 - Mid-Tex Gas Division Addition 080.71634 37602 10,032
080 190 - Mid-Tex Gas Division Addition 080.71634 38000 2,508
080 190 - Mid-Tex Gas Division Addition 080.71635 37602 8,790
080 190 - Mid-Tex Gas Division Addition 080.71636 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71639 37602 427
080 190 - Mid-Tex Gas Division Addition 080.71643 37602 89
080 190 - Mid-Tex Gas Division Addition 080.71647 37602 12,056
080 190 - Mid-Tex Gas Division Addition 080.71647 38000 8,038
080 190 - Mid-Tex Gas Division Addition 080.71648 37602 25,138
080 190 - Mid-Tex Gas Division Addition 080.71648 38000 10,773
080 190 - Mid-Tex Gas Division Addition 080.71649 37602 1
080 190 - Mid-Tex Gas Division Addition 080.71654 37602 5,265
080 190 - Mid-Tex Gas Division Addition 080.71654 37800 6,435
080 190 - Mid-Tex Gas Division Addition 080.71658 37602 (27)
080 190 - Mid-Tex Gas Division Addition 080.71659 37602 1
MTX Additions by FERC
Page 62 of 101
460
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.71664 37602 13,268
080 190 - Mid-Tex Gas Division Addition 080.71664 38000 4,423
080 190 - Mid-Tex Gas Division Addition 080.71665 37402 -
080 190 - Mid-Tex Gas Division Addition 080.71665 37602 221,799
080 190 - Mid-Tex Gas Division Addition 080.71672 39906 -
080 190 - Mid-Tex Gas Division Addition 080.71673 37601 (8)
080 190 - Mid-Tex Gas Division Addition 080.71674 37602 254
080 190 - Mid-Tex Gas Division Addition 080.71679 37602 5,823
080 190 - Mid-Tex Gas Division Addition 080.71680 37602 284
080 190 - Mid-Tex Gas Division Addition 080.71684 37602 8,684
080 190 - Mid-Tex Gas Division Addition 080.71684 38000 457
080 190 - Mid-Tex Gas Division Addition 080.71685 37602 9,363
080 190 - Mid-Tex Gas Division Addition 080.71687 37602 284,928
080 190 - Mid-Tex Gas Division Addition 080.71687 37800 (85,719)
080 190 - Mid-Tex Gas Division Addition 080.71688 37602 2,129
080 190 - Mid-Tex Gas Division Addition 080.71688 37800 2,129
080 190 - Mid-Tex Gas Division Addition 080.71695 37602 288
080 190 - Mid-Tex Gas Division Addition 080.71700 37602 34,572
080 190 - Mid-Tex Gas Division Addition 080.71701 37602 13,119
080 190 - Mid-Tex Gas Division Addition 080.71702 37602 19,237
080 190 - Mid-Tex Gas Division Addition 080.71703 37602 272,398
080 190 - Mid-Tex Gas Division Addition 080.71704 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71709 37602 2
080 190 - Mid-Tex Gas Division Addition 080.71710 37602 45,246
080 190 - Mid-Tex Gas Division Addition 080.71710 38000 5,027
080 190 - Mid-Tex Gas Division Addition 080.71711 37602 582
080 190 - Mid-Tex Gas Division Addition 080.71716 37602 1,225,058
080 190 - Mid-Tex Gas Division Addition 080.71716 38000 345,529
080 190 - Mid-Tex Gas Division Addition 080.71717 37602 12,616
080 190 - Mid-Tex Gas Division Addition 080.71719 38000 52,459
080 190 - Mid-Tex Gas Division Addition 080.71728 37800 3,115
080 190 - Mid-Tex Gas Division Addition 080.71733 37602 951
080 190 - Mid-Tex Gas Division Addition 080.71736 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71737 37602 25,901
080 190 - Mid-Tex Gas Division Addition 080.71738 37602 41,286
080 190 - Mid-Tex Gas Division Addition 080.71738 38000 10,322
080 190 - Mid-Tex Gas Division Addition 080.71744 37602 374
080 190 - Mid-Tex Gas Division Addition 080.71747 37602 2,856
080 190 - Mid-Tex Gas Division Addition 080.71755 37601 (888,716)
080 190 - Mid-Tex Gas Division Addition 080.71755 37602 (1,086,209)
080 190 - Mid-Tex Gas Division Addition 080.71758 37602 216,980
080 190 - Mid-Tex Gas Division Addition 080.71759 37602 5,797
080 190 - Mid-Tex Gas Division Addition 080.71760 37602 44,909
080 190 - Mid-Tex Gas Division Addition 080.71760 38000 9,438
080 190 - Mid-Tex Gas Division Addition 080.71761 37602 25,179
080 190 - Mid-Tex Gas Division Addition 080.71762 37602 12,897
080 190 - Mid-Tex Gas Division Addition 080.71762 38000 3,224
080 190 - Mid-Tex Gas Division Addition 080.71763 37602 451,854
080 190 - Mid-Tex Gas Division Addition 080.71768 37601 17,814
080 190 - Mid-Tex Gas Division Addition 080.71773 37602 657,655
080 190 - Mid-Tex Gas Division Addition 080.71773 38000 144,363
080 190 - Mid-Tex Gas Division Addition 080.71775 37602 815,004
080 190 - Mid-Tex Gas Division Addition 080.71779 37602 471,040
080 190 - Mid-Tex Gas Division Addition 080.71786 37602 67,591
080 190 - Mid-Tex Gas Division Addition 080.71787 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71792 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71797 37602 (34)
080 190 - Mid-Tex Gas Division Addition 080.71800 37602 568
080 190 - Mid-Tex Gas Division Addition 080.71801 37602 267
080 190 - Mid-Tex Gas Division Addition 080.71804 37602 (131)
080 190 - Mid-Tex Gas Division Addition 080.71805 37602 333,332
080 190 - Mid-Tex Gas Division Addition 080.71805 38000 37,037
080 190 - Mid-Tex Gas Division Addition 080.71807 37602 320
080 190 - Mid-Tex Gas Division Addition 080.71809 37601 436
080 190 - Mid-Tex Gas Division Addition 080.71809 37602 1,745
080 190 - Mid-Tex Gas Division Addition 080.71810 37602 (58)
080 190 - Mid-Tex Gas Division Addition 080.71811 37602 19,598
080 190 - Mid-Tex Gas Division Addition 080.71817 37602 16,113
080 190 - Mid-Tex Gas Division Addition 080.71817 38000 848
080 190 - Mid-Tex Gas Division Addition 080.71819 37602 783
080 190 - Mid-Tex Gas Division Addition 080.71823 37602 7,749
080 190 - Mid-Tex Gas Division Addition 080.71823 38000 408
080 190 - Mid-Tex Gas Division Addition 080.71824 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71830 37601 365
080 190 - Mid-Tex Gas Division Addition 080.71830 37602 3,286
080 190 - Mid-Tex Gas Division Addition 080.71832 37602 1,851,238
080 190 - Mid-Tex Gas Division Addition 080.71832 38000 37,780
080 190 - Mid-Tex Gas Division Addition 080.71833 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71835 37602 22,562
080 190 - Mid-Tex Gas Division Addition 080.71836 37602 7,931
080 190 - Mid-Tex Gas Division Addition 080.71836 38000 417
080 190 - Mid-Tex Gas Division Addition 080.71837 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71838 37602 5,853
080 190 - Mid-Tex Gas Division Addition 080.71839 37601 244,341
080 190 - Mid-Tex Gas Division Addition 080.71839 37602 10,262,344
080 190 - Mid-Tex Gas Division Addition 080.71839 37800 1,099,537
080 190 - Mid-Tex Gas Division Addition 080.71839 38000 610,854
080 190 - Mid-Tex Gas Division Addition 080.71849 37601 109,535
080 190 - Mid-Tex Gas Division Addition 080.71850 37601 149,881
080 190 - Mid-Tex Gas Division Addition 080.71850 37800 6,245
080 190 - Mid-Tex Gas Division Addition 080.71852 37602 253,693
080 190 - Mid-Tex Gas Division Addition 080.71855 37602 712
080 190 - Mid-Tex Gas Division Addition 080.71855 38000 178
080 190 - Mid-Tex Gas Division Addition 080.71856 37601 812,731
080 190 - Mid-Tex Gas Division Addition 080.71856 37602 290,330
080 190 - Mid-Tex Gas Division Addition 080.71856 38000 58,066
080 190 - Mid-Tex Gas Division Addition 080.71857 37602 54,209
080 190 - Mid-Tex Gas Division Addition 080.71857 38000 2,853
080 190 - Mid-Tex Gas Division Addition 080.71864 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71865 37601 209,517
080 190 - Mid-Tex Gas Division Addition 080.71869 37602 11
080 190 - Mid-Tex Gas Division Addition 080.71870 37602 3,503
080 190 - Mid-Tex Gas Division Addition 080.71874 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71875 37602 4,489
080 190 - Mid-Tex Gas Division Addition 080.71875 38000 499
080 190 - Mid-Tex Gas Division Addition 080.71878 37601 647
080 190 - Mid-Tex Gas Division Addition 080.71878 37602 3,669
MTX Additions by FERC
Page 63 of 101
461
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.71882 37602 13,533
080 190 - Mid-Tex Gas Division Addition 080.71882 38000 1,504
080 190 - Mid-Tex Gas Division Addition 080.71884 37602 9,692
080 190 - Mid-Tex Gas Division Addition 080.71884 37800 174,448
080 190 - Mid-Tex Gas Division Addition 080.71884 38000 9,692
080 190 - Mid-Tex Gas Division Addition 080.71892 37601 3,328,742
080 190 - Mid-Tex Gas Division Addition 080.71894 37601 383,472
080 190 - Mid-Tex Gas Division Addition 080.71894 37602 920,333
080 190 - Mid-Tex Gas Division Addition 080.71894 37800 76,694
080 190 - Mid-Tex Gas Division Addition 080.71894 38000 153,389
080 190 - Mid-Tex Gas Division Addition 080.71900 37602 36,332
080 190 - Mid-Tex Gas Division Addition 080.71900 38000 24,221
080 190 - Mid-Tex Gas Division Addition 080.71902 37602 919
080 190 - Mid-Tex Gas Division Addition 080.71903 37602 20,084
080 190 - Mid-Tex Gas Division Addition 080.71905 37602 9,900
080 190 - Mid-Tex Gas Division Addition 080.71905 38000 1,747
080 190 - Mid-Tex Gas Division Addition 080.71907 37602 177,725
080 190 - Mid-Tex Gas Division Addition 080.71909 37602 168,044
080 190 - Mid-Tex Gas Division Addition 080.71910 37602 98,343
080 190 - Mid-Tex Gas Division Addition 080.71915 37602 2,665
080 190 - Mid-Tex Gas Division Addition 080.71919 37602 11,923
080 190 - Mid-Tex Gas Division Addition 080.71919 38000 1,037
080 190 - Mid-Tex Gas Division Addition 080.71921 37602 17,409
080 190 - Mid-Tex Gas Division Addition 080.71921 38000 11,130
080 190 - Mid-Tex Gas Division Addition 080.71922 37602 1,929
080 190 - Mid-Tex Gas Division Addition 080.71922 37800 4,501
080 190 - Mid-Tex Gas Division Addition 080.71923 37602 3,416
080 190 - Mid-Tex Gas Division Addition 080.71923 38000 35
080 190 - Mid-Tex Gas Division Addition 080.71929 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71931 37601 71,286
080 190 - Mid-Tex Gas Division Addition 080.71932 37602 27,923
080 190 - Mid-Tex Gas Division Addition 080.71933 37601 31,838
080 190 - Mid-Tex Gas Division Addition 080.71937 37602 1,937
080 190 - Mid-Tex Gas Division Addition 080.71938 37602 288
080 190 - Mid-Tex Gas Division Addition 080.71939 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71940 37602 11,285
080 190 - Mid-Tex Gas Division Addition 080.71942 37602 349
080 190 - Mid-Tex Gas Division Addition 080.71943 37601 206,856
080 190 - Mid-Tex Gas Division Addition 080.71943 37800 17,988
080 190 - Mid-Tex Gas Division Addition 080.71944 37602 12,403
080 190 - Mid-Tex Gas Division Addition 080.71944 38000 3,101
080 190 - Mid-Tex Gas Division Addition 080.71945 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71947 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71948 37602 52,447
080 190 - Mid-Tex Gas Division Addition 080.71948 38000 9,255
080 190 - Mid-Tex Gas Division Addition 080.71950 37602 11,627
080 190 - Mid-Tex Gas Division Addition 080.71951 37601 110,008
080 190 - Mid-Tex Gas Division Addition 080.71951 37800 1,111
080 190 - Mid-Tex Gas Division Addition 080.71952 37602 61,261
080 190 - Mid-Tex Gas Division Addition 080.71953 37602 -
080 190 - Mid-Tex Gas Division Addition 080.71954 37602 (81)
080 190 - Mid-Tex Gas Division Addition 080.71955 37602 1,683
080 190 - Mid-Tex Gas Division Addition 080.71955 38000 34
080 190 - Mid-Tex Gas Division Addition 080.71956 37602 395,985
080 190 - Mid-Tex Gas Division Addition 080.71956 38000 20,841
080 190 - Mid-Tex Gas Division Addition 080.71960 37602 14,920
080 190 - Mid-Tex Gas Division Addition 080.71960 38000 3,500
080 190 - Mid-Tex Gas Division Addition 080.71962 37602 22,019
080 190 - Mid-Tex Gas Division Addition 080.71962 38000 2,178
080 190 - Mid-Tex Gas Division Addition 080.71964 37602 66,321
080 190 - Mid-Tex Gas Division Addition 080.71965 37800 174
080 190 - Mid-Tex Gas Division Addition 080.71967 37602 1,437
080 190 - Mid-Tex Gas Division Addition 080.71967 37800 4,310
080 190 - Mid-Tex Gas Division Addition 080.71968 37602 732
080 190 - Mid-Tex Gas Division Addition 080.71969 37601 (51,222)
080 190 - Mid-Tex Gas Division Addition 080.71971 37602 14,769
080 190 - Mid-Tex Gas Division Addition 080.71971 38000 1,641
080 190 - Mid-Tex Gas Division Addition 080.71975 37601 27,910
080 190 - Mid-Tex Gas Division Addition 080.71975 37602 6,978
080 190 - Mid-Tex Gas Division Addition 080.71976 37602 8,836
080 190 - Mid-Tex Gas Division Addition 080.71976 38000 5,891
080 190 - Mid-Tex Gas Division Addition 080.71978 37602 (16,193)
080 190 - Mid-Tex Gas Division Addition 080.71982 37602 435,245
080 190 - Mid-Tex Gas Division Addition 080.71993 37601 204,405
080 190 - Mid-Tex Gas Division Addition 080.71995 37602 3,458
080 190 - Mid-Tex Gas Division Addition 080.71995 38000 182
080 190 - Mid-Tex Gas Division Addition 080.71996 37602 288
080 190 - Mid-Tex Gas Division Addition 080.71998 37602 14,342
080 190 - Mid-Tex Gas Division Addition 080.71998 38000 2,531
080 190 - Mid-Tex Gas Division Addition 080.71999 37602 1,242,698
080 190 - Mid-Tex Gas Division Addition 080.71999 38000 699,018
080 190 - Mid-Tex Gas Division Addition 080.72000 37602 43,832
080 190 - Mid-Tex Gas Division Addition 080.72000 38000 2,307
080 190 - Mid-Tex Gas Division Addition 080.72001 37601 132,567
080 190 - Mid-Tex Gas Division Addition 080.72001 37800 530,269
080 190 - Mid-Tex Gas Division Addition 080.72002 37602 7,126
080 190 - Mid-Tex Gas Division Addition 080.72002 38000 792
080 190 - Mid-Tex Gas Division Addition 080.72011 37602 20,996
080 190 - Mid-Tex Gas Division Addition 080.72011 38000 8,998
080 190 - Mid-Tex Gas Division Addition 080.72012 37602 22,179
080 190 - Mid-Tex Gas Division Addition 080.72014 37602 9
080 190 - Mid-Tex Gas Division Addition 080.72015 37602 22,067
080 190 - Mid-Tex Gas Division Addition 080.72016 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72019 37602 4,833
080 190 - Mid-Tex Gas Division Addition 080.72035 37602 3,277
080 190 - Mid-Tex Gas Division Addition 080.72035 38000 364
080 190 - Mid-Tex Gas Division Addition 080.72036 37602 80,835
080 190 - Mid-Tex Gas Division Addition 080.72036 38000 26,945
080 190 - Mid-Tex Gas Division Addition 080.72039 37602 51,723
080 190 - Mid-Tex Gas Division Addition 080.72039 38000 3,302
080 190 - Mid-Tex Gas Division Addition 080.72044 37601 46,577
080 190 - Mid-Tex Gas Division Addition 080.72045 37601 431,604
080 190 - Mid-Tex Gas Division Addition 080.72048 37602 7,924
080 190 - Mid-Tex Gas Division Addition 080.72048 38000 417
080 190 - Mid-Tex Gas Division Addition 080.72049 37602 9,208
080 190 - Mid-Tex Gas Division Addition 080.72057 37602 2,510
080 190 - Mid-Tex Gas Division Addition 080.72057 37800 (13)
MTX Additions by FERC
Page 64 of 101
462
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.72057 37900 1,255
080 190 - Mid-Tex Gas Division Addition 080.72058 37602 5,891
080 190 - Mid-Tex Gas Division Addition 080.72058 38000 233
080 190 - Mid-Tex Gas Division Addition 080.72063 37601 1,886
080 190 - Mid-Tex Gas Division Addition 080.72063 37602 1,508
080 190 - Mid-Tex Gas Division Addition 080.72063 37900 905
080 190 - Mid-Tex Gas Division Addition 080.72068 37602 2,130
080 190 - Mid-Tex Gas Division Addition 080.72074 37602 9,047
080 190 - Mid-Tex Gas Division Addition 080.72075 37602 1,829
080 190 - Mid-Tex Gas Division Addition 080.72075 38000 7,316
080 190 - Mid-Tex Gas Division Addition 080.72077 37602 2,412
080 190 - Mid-Tex Gas Division Addition 080.72078 37602 1,508
080 190 - Mid-Tex Gas Division Addition 080.72082 37602 1,683
080 190 - Mid-Tex Gas Division Addition 080.72085 37602 73,226
080 190 - Mid-Tex Gas Division Addition 080.72085 38000 27,083
080 190 - Mid-Tex Gas Division Addition 080.72092 39906 -
080 190 - Mid-Tex Gas Division Addition 080.72099 37602 24,231
080 190 - Mid-Tex Gas Division Addition 080.72103 37601 9,607
080 190 - Mid-Tex Gas Division Addition 080.72103 37602 4,803
080 190 - Mid-Tex Gas Division Addition 080.72103 37800 81,657
080 190 - Mid-Tex Gas Division Addition 080.72109 37602 66,703
080 190 - Mid-Tex Gas Division Addition 080.72111 37602 534
080 190 - Mid-Tex Gas Division Addition 080.72116 37602 4,323
080 190 - Mid-Tex Gas Division Addition 080.72119 37602 244,915
080 190 - Mid-Tex Gas Division Addition 080.72120 37602 11,535
080 190 - Mid-Tex Gas Division Addition 080.72120 38000 2,884
080 190 - Mid-Tex Gas Division Addition 080.72122 37601 1,303
080 190 - Mid-Tex Gas Division Addition 080.72122 37602 37,352
080 190 - Mid-Tex Gas Division Addition 080.72122 38000 4,778
080 190 - Mid-Tex Gas Division Addition 080.72123 37602 18,043
080 190 - Mid-Tex Gas Division Addition 080.72123 38000 4,511
080 190 - Mid-Tex Gas Division Addition 080.72135 37602 392,994
080 190 - Mid-Tex Gas Division Addition 080.72140 37602 5,753
080 190 - Mid-Tex Gas Division Addition 080.72140 38000 303
080 190 - Mid-Tex Gas Division Addition 080.72141 37602 13,431
080 190 - Mid-Tex Gas Division Addition 080.72142 37602 (43)
080 190 - Mid-Tex Gas Division Addition 080.72144 37602 52,512
080 190 - Mid-Tex Gas Division Addition 080.72145 37602 2,491
080 190 - Mid-Tex Gas Division Addition 080.72145 38000 131
080 190 - Mid-Tex Gas Division Addition 080.72155 37602 3,612
080 190 - Mid-Tex Gas Division Addition 080.72155 38000 903
080 190 - Mid-Tex Gas Division Addition 080.72158 37602 40,477
080 190 - Mid-Tex Gas Division Addition 080.72158 38000 2,130
080 190 - Mid-Tex Gas Division Addition 080.72162 37602 4,537
080 190 - Mid-Tex Gas Division Addition 080.72163 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72164 37602 13,044
080 190 - Mid-Tex Gas Division Addition 080.72164 38000 686
080 190 - Mid-Tex Gas Division Addition 080.72167 37600 250
080 190 - Mid-Tex Gas Division Addition 080.72168 37602 5,466
080 190 - Mid-Tex Gas Division Addition 080.72168 38000 607
080 190 - Mid-Tex Gas Division Addition 080.72170 37602 13,958
080 190 - Mid-Tex Gas Division Addition 080.72170 38000 285
080 190 - Mid-Tex Gas Division Addition 080.72174 37602 1,668
080 190 - Mid-Tex Gas Division Addition 080.72176 37602 2,622
080 190 - Mid-Tex Gas Division Addition 080.72176 38000 26
080 190 - Mid-Tex Gas Division Addition 080.72177 37602 7,631
080 190 - Mid-Tex Gas Division Addition 080.72180 37602 14,677
080 190 - Mid-Tex Gas Division Addition 080.72180 38000 775
080 190 - Mid-Tex Gas Division Addition 080.72181 37602 10,642
080 190 - Mid-Tex Gas Division Addition 080.72182 37602 419
080 190 - Mid-Tex Gas Division Addition 080.72187 37800 2,008
080 190 - Mid-Tex Gas Division Addition 080.72191 37601 286
080 190 - Mid-Tex Gas Division Addition 080.72191 37800 4,867
080 190 - Mid-Tex Gas Division Addition 080.72191 38100 573
080 190 - Mid-Tex Gas Division Addition 080.72192 37602 1,786
080 190 - Mid-Tex Gas Division Addition 080.72195 37602 (17,916)
080 190 - Mid-Tex Gas Division Addition 080.72196 37602 2,759
080 190 - Mid-Tex Gas Division Addition 080.72196 38000 145
080 190 - Mid-Tex Gas Division Addition 080.72199 37602 (121,218)
080 190 - Mid-Tex Gas Division Addition 080.72199 38000 (13,469)
080 190 - Mid-Tex Gas Division Addition 080.72202 37602 3,212
080 190 - Mid-Tex Gas Division Addition 080.72202 38000 66
080 190 - Mid-Tex Gas Division Addition 080.72203 37602 26,597
080 190 - Mid-Tex Gas Division Addition 080.72203 38000 2,955
080 190 - Mid-Tex Gas Division Addition 080.72204 37602 4,890
080 190 - Mid-Tex Gas Division Addition 080.72207 37602 542
080 190 - Mid-Tex Gas Division Addition 080.72208 37602 604,093
080 190 - Mid-Tex Gas Division Addition 080.72210 37602 472
080 190 - Mid-Tex Gas Division Addition 080.72223 37602 1,083,263
080 190 - Mid-Tex Gas Division Addition 080.72229 37602 1,579
080 190 - Mid-Tex Gas Division Addition 080.72231 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72231 38000 -
080 190 - Mid-Tex Gas Division Addition 080.72232 39400 3,996
080 190 - Mid-Tex Gas Division Addition 080.72233 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72235 37602 (15,801)
080 190 - Mid-Tex Gas Division Addition 080.72235 37800 (3,950)
080 190 - Mid-Tex Gas Division Addition 080.72238 37602 784
080 190 - Mid-Tex Gas Division Addition 080.72240 37602 77,802
080 190 - Mid-Tex Gas Division Addition 080.72240 38000 13,730
080 190 - Mid-Tex Gas Division Addition 080.72241 37602 3,524
080 190 - Mid-Tex Gas Division Addition 080.72242 37602 9,527
080 190 - Mid-Tex Gas Division Addition 080.72243 37602 322
080 190 - Mid-Tex Gas Division Addition 080.72247 37800 13,036
080 190 - Mid-Tex Gas Division Addition 080.72247 38000 73,869
080 190 - Mid-Tex Gas Division Addition 080.72248 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72248 38000 19,590
080 190 - Mid-Tex Gas Division Addition 080.72249 38000 (1,527)
080 190 - Mid-Tex Gas Division Addition 080.72249 38500 (1,018)
080 190 - Mid-Tex Gas Division Addition 080.72250 37602 (500)
080 190 - Mid-Tex Gas Division Addition 080.72250 38000 (6,994)
080 190 - Mid-Tex Gas Division Addition 080.72250 38500 (2,498)
080 190 - Mid-Tex Gas Division Addition 080.72251 37602 6,954
080 190 - Mid-Tex Gas Division Addition 080.72252 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72255 38000 4,074
080 190 - Mid-Tex Gas Division Addition 080.72259 37602 57
080 190 - Mid-Tex Gas Division Addition 080.72266 37601 275,257
080 190 - Mid-Tex Gas Division Addition 080.72266 38000 2,780
MTX Additions by FERC
Page 65 of 101
463
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.72268 37800 1,475
080 190 - Mid-Tex Gas Division Addition 080.72270 37602 948,544
080 190 - Mid-Tex Gas Division Addition 080.72270 38000 105,394
080 190 - Mid-Tex Gas Division Addition 080.72272 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72273 37602 8,064
080 190 - Mid-Tex Gas Division Addition 080.72275 37602 14,139
080 190 - Mid-Tex Gas Division Addition 080.72275 38000 1,571
080 190 - Mid-Tex Gas Division Addition 080.72277 37800 3
080 190 - Mid-Tex Gas Division Addition 080.72278 37601 25,258
080 190 - Mid-Tex Gas Division Addition 080.72278 37602 88,403
080 190 - Mid-Tex Gas Division Addition 080.72278 38000 12,629
080 190 - Mid-Tex Gas Division Addition 080.72280 37602 205,607
080 190 - Mid-Tex Gas Division Addition 080.72281 37602 578
080 190 - Mid-Tex Gas Division Addition 080.72285 37602 426,195
080 190 - Mid-Tex Gas Division Addition 080.72286 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72289 37602 12,983
080 190 - Mid-Tex Gas Division Addition 080.72290 37602 7,027
080 190 - Mid-Tex Gas Division Addition 080.72290 38000 1,757
080 190 - Mid-Tex Gas Division Addition 080.72292 37602 28,985
080 190 - Mid-Tex Gas Division Addition 080.72292 38000 7,246
080 190 - Mid-Tex Gas Division Addition 080.72294 37602 5,156
080 190 - Mid-Tex Gas Division Addition 080.72299 37602 10,566
080 190 - Mid-Tex Gas Division Addition 080.72300 37602 149
080 190 - Mid-Tex Gas Division Addition 080.72300 38000 50
080 190 - Mid-Tex Gas Division Addition 080.72308 37602 3,075
080 190 - Mid-Tex Gas Division Addition 080.72310 37602 6,163
080 190 - Mid-Tex Gas Division Addition 080.72310 38000 685
080 190 - Mid-Tex Gas Division Addition 080.72311 37602 26,382
080 190 - Mid-Tex Gas Division Addition 080.72314 37602 10,094
080 190 - Mid-Tex Gas Division Addition 080.72315 37602 144,766
080 190 - Mid-Tex Gas Division Addition 080.72317 37602 (16)
080 190 - Mid-Tex Gas Division Addition 080.72320 37602 (48,528)
080 190 - Mid-Tex Gas Division Addition 080.72320 38000 (490)
080 190 - Mid-Tex Gas Division Addition 080.72321 37602 18,303
080 190 - Mid-Tex Gas Division Addition 080.72321 38000 1,592
080 190 - Mid-Tex Gas Division Addition 080.72322 37602 20,090
080 190 - Mid-Tex Gas Division Addition 080.72322 38000 2,232
080 190 - Mid-Tex Gas Division Addition 080.72324 37602 951,657
080 190 - Mid-Tex Gas Division Addition 080.72329 37602 478,082
080 190 - Mid-Tex Gas Division Addition 080.72336 37602 66,877
080 190 - Mid-Tex Gas Division Addition 080.72338 37602 5,799
080 190 - Mid-Tex Gas Division Addition 080.72339 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72345 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72347 37602 340,803
080 190 - Mid-Tex Gas Division Addition 080.72347 38000 17,937
080 190 - Mid-Tex Gas Division Addition 080.72348 37602 1,397
080 190 - Mid-Tex Gas Division Addition 080.72348 37800 5,588
080 190 - Mid-Tex Gas Division Addition 080.72352 37800 6,267
080 190 - Mid-Tex Gas Division Addition 080.72353 37602 7,328
080 190 - Mid-Tex Gas Division Addition 080.72353 38000 814
080 190 - Mid-Tex Gas Division Addition 080.72354 37602 11,813
080 190 - Mid-Tex Gas Division Addition 080.72354 38000 1,315
080 190 - Mid-Tex Gas Division Addition 080.72364 37602 217
080 190 - Mid-Tex Gas Division Addition 080.72367 37602 10,426
080 190 - Mid-Tex Gas Division Addition 080.72367 38000 549
080 190 - Mid-Tex Gas Division Addition 080.72368 38000 20,318
080 190 - Mid-Tex Gas Division Addition 080.72369 37601 76
080 190 - Mid-Tex Gas Division Addition 080.72369 37602 3,324
080 190 - Mid-Tex Gas Division Addition 080.72369 38000 420
080 190 - Mid-Tex Gas Division Addition 080.72371 37602 74,917
080 190 - Mid-Tex Gas Division Addition 080.72372 37602 434,067
080 190 - Mid-Tex Gas Division Addition 080.72372 38000 144,689
080 190 - Mid-Tex Gas Division Addition 080.72373 37601 58,958
080 190 - Mid-Tex Gas Division Addition 080.72373 37602 2,358
080 190 - Mid-Tex Gas Division Addition 080.72373 37800 5,896
080 190 - Mid-Tex Gas Division Addition 080.72373 37900 50,704
080 190 - Mid-Tex Gas Division Addition 080.72377 37602 4,194
080 190 - Mid-Tex Gas Division Addition 080.72379 37602 3
080 190 - Mid-Tex Gas Division Addition 080.72380 37602 8,533
080 190 - Mid-Tex Gas Division Addition 080.72385 37602 8,915
080 190 - Mid-Tex Gas Division Addition 080.72385 38000 991
080 190 - Mid-Tex Gas Division Addition 080.72386 37602 5,694
080 190 - Mid-Tex Gas Division Addition 080.72386 38000 633
080 190 - Mid-Tex Gas Division Addition 080.72387 37602 7,950
080 190 - Mid-Tex Gas Division Addition 080.72387 38000 883
080 190 - Mid-Tex Gas Division Addition 080.72388 37602 3,185
080 190 - Mid-Tex Gas Division Addition 080.72388 38000 562
080 190 - Mid-Tex Gas Division Addition 080.72389 37602 3,451
080 190 - Mid-Tex Gas Division Addition 080.72389 38000 383
080 190 - Mid-Tex Gas Division Addition 080.72390 37602 109,113
080 190 - Mid-Tex Gas Division Addition 080.72390 38000 19,255
080 190 - Mid-Tex Gas Division Addition 080.72391 37602 245,315
080 190 - Mid-Tex Gas Division Addition 080.72391 38000 12,911
080 190 - Mid-Tex Gas Division Addition 080.72392 37602 120,284
080 190 - Mid-Tex Gas Division Addition 080.72392 38000 13,365
080 190 - Mid-Tex Gas Division Addition 080.72401 37601 36,503
080 190 - Mid-Tex Gas Division Addition 080.72403 37601 (90,073)
080 190 - Mid-Tex Gas Division Addition 080.72408 37602 20,731
080 190 - Mid-Tex Gas Division Addition 080.72409 37602 445
080 190 - Mid-Tex Gas Division Addition 080.72412 37602 714
080 190 - Mid-Tex Gas Division Addition 080.72413 37601 756,396
080 190 - Mid-Tex Gas Division Addition 080.72413 37602 63,033
080 190 - Mid-Tex Gas Division Addition 080.72413 37800 432,822
080 190 - Mid-Tex Gas Division Addition 080.72415 38000 3,370
080 190 - Mid-Tex Gas Division Addition 080.72418 37601 413
080 190 - Mid-Tex Gas Division Addition 080.72418 37602 3,513
080 190 - Mid-Tex Gas Division Addition 080.72418 38000 207
080 190 - Mid-Tex Gas Division Addition 080.72420 37602 38,361
080 190 - Mid-Tex Gas Division Addition 080.72420 38000 2,019
080 190 - Mid-Tex Gas Division Addition 080.72421 37602 144,486
080 190 - Mid-Tex Gas Division Addition 080.72421 38000 1,460
080 190 - Mid-Tex Gas Division Addition 080.72426 37602 11,106
080 190 - Mid-Tex Gas Division Addition 080.72426 38000 2,777
080 190 - Mid-Tex Gas Division Addition 080.72431 37602 3,345
080 190 - Mid-Tex Gas Division Addition 080.72437 37602 9,493
080 190 - Mid-Tex Gas Division Addition 080.72437 38000 500
080 190 - Mid-Tex Gas Division Addition 080.72438 37602 256,957
MTX Additions by FERC
Page 66 of 101
464
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.72438 38000 110,124
080 190 - Mid-Tex Gas Division Addition 080.72439 37602 867,868
080 190 - Mid-Tex Gas Division Addition 080.72439 38000 153,153
080 190 - Mid-Tex Gas Division Addition 080.72443 37602 16,809
080 190 - Mid-Tex Gas Division Addition 080.72443 38000 1,868
080 190 - Mid-Tex Gas Division Addition 080.72448 37602 26,200
080 190 - Mid-Tex Gas Division Addition 080.72448 38000 1,379
080 190 - Mid-Tex Gas Division Addition 080.72449 37602 28,787
080 190 - Mid-Tex Gas Division Addition 080.72449 38000 1,515
080 190 - Mid-Tex Gas Division Addition 080.72450 37602 32,609
080 190 - Mid-Tex Gas Division Addition 080.72450 38000 1,009
080 190 - Mid-Tex Gas Division Addition 080.72451 37602 14,248
080 190 - Mid-Tex Gas Division Addition 080.72451 38000 1,583
080 190 - Mid-Tex Gas Division Addition 080.72452 37602 111,922
080 190 - Mid-Tex Gas Division Addition 080.72452 38000 19,751
080 190 - Mid-Tex Gas Division Addition 080.72461 37602 11,299
080 190 - Mid-Tex Gas Division Addition 080.72461 38000 1,255
080 190 - Mid-Tex Gas Division Addition 080.72463 37602 5,014
080 190 - Mid-Tex Gas Division Addition 080.72467 37602 8,464
080 190 - Mid-Tex Gas Division Addition 080.72470 37602 16,131
080 190 - Mid-Tex Gas Division Addition 080.72473 37601 238,563
080 190 - Mid-Tex Gas Division Addition 080.72473 37602 79,521
080 190 - Mid-Tex Gas Division Addition 080.72473 37800 477,127
080 190 - Mid-Tex Gas Division Addition 080.72479 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72480 37601 (293,122)
080 190 - Mid-Tex Gas Division Addition 080.72490 37602 6,626
080 190 - Mid-Tex Gas Division Addition 080.72490 38000 349
080 190 - Mid-Tex Gas Division Addition 080.72491 37602 80
080 190 - Mid-Tex Gas Division Addition 080.72493 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72495 37602 9,526
080 190 - Mid-Tex Gas Division Addition 080.72495 38000 96
080 190 - Mid-Tex Gas Division Addition 080.72497 37602 9,177
080 190 - Mid-Tex Gas Division Addition 080.72497 38000 93
080 190 - Mid-Tex Gas Division Addition 080.72498 37602 9,796
080 190 - Mid-Tex Gas Division Addition 080.72498 38000 2,449
080 190 - Mid-Tex Gas Division Addition 080.72499 37602 24,077
080 190 - Mid-Tex Gas Division Addition 080.72499 38000 6,019
080 190 - Mid-Tex Gas Division Addition 080.72500 37602 (153,984)
080 190 - Mid-Tex Gas Division Addition 080.72502 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72504 37601 11,944
080 190 - Mid-Tex Gas Division Addition 080.72505 37602 14,401
080 190 - Mid-Tex Gas Division Addition 080.72505 38000 1,252
080 190 - Mid-Tex Gas Division Addition 080.72508 37800 69
080 190 - Mid-Tex Gas Division Addition 080.72508 38000 8
080 190 - Mid-Tex Gas Division Addition 080.72512 37602 15,158
080 190 - Mid-Tex Gas Division Addition 080.72512 38000 8,162
080 190 - Mid-Tex Gas Division Addition 080.72516 37602 370
080 190 - Mid-Tex Gas Division Addition 080.72517 37601 -
080 190 - Mid-Tex Gas Division Addition 080.72517 37602 1,937,434
080 190 - Mid-Tex Gas Division Addition 080.72518 37602 530,025
080 190 - Mid-Tex Gas Division Addition 080.72524 37602 188,372
080 190 - Mid-Tex Gas Division Addition 080.72524 38000 101,431
080 190 - Mid-Tex Gas Division Addition 080.72525 37602 323,147
080 190 - Mid-Tex Gas Division Addition 080.72525 38000 35,905
080 190 - Mid-Tex Gas Division Addition 080.72526 37602 372,564
080 190 - Mid-Tex Gas Division Addition 080.72526 38000 93,141
080 190 - Mid-Tex Gas Division Addition 080.72527 37602 308,664
080 190 - Mid-Tex Gas Division Addition 080.72527 38000 3,118
080 190 - Mid-Tex Gas Division Addition 080.72528 37602 306,248
080 190 - Mid-Tex Gas Division Addition 080.72528 38000 16,118
080 190 - Mid-Tex Gas Division Addition 080.72529 37602 458,290
080 190 - Mid-Tex Gas Division Addition 080.72529 38000 114,573
080 190 - Mid-Tex Gas Division Addition 080.72530 37602 698
080 190 - Mid-Tex Gas Division Addition 080.72532 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72533 37602 84,189
080 190 - Mid-Tex Gas Division Addition 080.72533 38000 14,857
080 190 - Mid-Tex Gas Division Addition 080.72534 37602 17,491
080 190 - Mid-Tex Gas Division Addition 080.72535 37602 216,112
080 190 - Mid-Tex Gas Division Addition 080.72535 38000 38,137
080 190 - Mid-Tex Gas Division Addition 080.72536 37602 211,397
080 190 - Mid-Tex Gas Division Addition 080.72536 38000 52,849
080 190 - Mid-Tex Gas Division Addition 080.72539 37601 15
080 190 - Mid-Tex Gas Division Addition 080.72539 37602 76,672
080 190 - Mid-Tex Gas Division Addition 080.72539 37800 15
080 190 - Mid-Tex Gas Division Addition 080.72542 37602 9,169
080 190 - Mid-Tex Gas Division Addition 080.72542 38000 1,019
080 190 - Mid-Tex Gas Division Addition 080.72544 37602 22,126
080 190 - Mid-Tex Gas Division Addition 080.72545 37602 17,670
080 190 - Mid-Tex Gas Division Addition 080.72550 37601 (4,906)
080 190 - Mid-Tex Gas Division Addition 080.72559 37602 411,845
080 190 - Mid-Tex Gas Division Addition 080.72563 37602 (92)
080 190 - Mid-Tex Gas Division Addition 080.72564 37602 5,277
080 190 - Mid-Tex Gas Division Addition 080.72568 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72569 37602 1,247
080 190 - Mid-Tex Gas Division Addition 080.72572 37602 11,805
080 190 - Mid-Tex Gas Division Addition 080.72572 38000 2,083
080 190 - Mid-Tex Gas Division Addition 080.72576 38100 43
080 190 - Mid-Tex Gas Division Addition 080.72577 37602 (47)
080 190 - Mid-Tex Gas Division Addition 080.72580 38100 6,813
080 190 - Mid-Tex Gas Division Addition 080.72582 38000 17,447
080 190 - Mid-Tex Gas Division Addition 080.72600 37602 3,147
080 190 - Mid-Tex Gas Division Addition 080.72600 38000 166
080 190 - Mid-Tex Gas Division Addition 080.72603 37602 7,186
080 190 - Mid-Tex Gas Division Addition 080.72604 37602 4,288
080 190 - Mid-Tex Gas Division Addition 080.72607 37602 14,791
080 190 - Mid-Tex Gas Division Addition 080.72607 38000 778
080 190 - Mid-Tex Gas Division Addition 080.72609 37602 151,247
080 190 - Mid-Tex Gas Division Addition 080.72610 37602 554
080 190 - Mid-Tex Gas Division Addition 080.72612 37602 614
080 190 - Mid-Tex Gas Division Addition 080.72616 37602 995
080 190 - Mid-Tex Gas Division Addition 080.72616 37900 2,322
080 190 - Mid-Tex Gas Division Addition 080.72617 37602 431,448
080 190 - Mid-Tex Gas Division Addition 080.72617 38000 107,862
080 190 - Mid-Tex Gas Division Addition 080.72618 37602 1,690
080 190 - Mid-Tex Gas Division Addition 080.72618 37800 1,690
080 190 - Mid-Tex Gas Division Addition 080.72621 37602 457,861
080 190 - Mid-Tex Gas Division Addition 080.72623 37602 15,950
MTX Additions by FERC
Page 67 of 101
465
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.72623 38000 309
080 190 - Mid-Tex Gas Division Addition 080.72626 37601 100,509
080 190 - Mid-Tex Gas Division Addition 080.72636 37602 (180,843)
080 190 - Mid-Tex Gas Division Addition 080.72646 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72649 37602 333,590
080 190 - Mid-Tex Gas Division Addition 080.72649 38000 179,625
080 190 - Mid-Tex Gas Division Addition 080.72651 37602 406,368
080 190 - Mid-Tex Gas Division Addition 080.72651 38000 174,158
080 190 - Mid-Tex Gas Division Addition 080.72653 37602 13,559
080 190 - Mid-Tex Gas Division Addition 080.72654 39000 63,117
080 190 - Mid-Tex Gas Division Addition 080.72654 39100 71,694
080 190 - Mid-Tex Gas Division Addition 080.72654 39906 782
080 190 - Mid-Tex Gas Division Addition 080.72655 39000 13,953
080 190 - Mid-Tex Gas Division Addition 080.72655 39100 10,907
080 190 - Mid-Tex Gas Division Addition 080.72655 39906 119
080 190 - Mid-Tex Gas Division Addition 080.72656 37602 586,575
080 190 - Mid-Tex Gas Division Addition 080.72656 38000 65,175
080 190 - Mid-Tex Gas Division Addition 080.72658 37602 408,212
080 190 - Mid-Tex Gas Division Addition 080.72659 37602 72
080 190 - Mid-Tex Gas Division Addition 080.72663 37602 2,413
080 190 - Mid-Tex Gas Division Addition 080.72664 37602 260,319
080 190 - Mid-Tex Gas Division Addition 080.72665 37602 4,621
080 190 - Mid-Tex Gas Division Addition 080.72675 37602 1,106
080 190 - Mid-Tex Gas Division Addition 080.72678 37602 2,287
080 190 - Mid-Tex Gas Division Addition 080.72678 38000 120
080 190 - Mid-Tex Gas Division Addition 080.72683 37602 1,469
080 190 - Mid-Tex Gas Division Addition 080.72686 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72687 37601 32,220
080 190 - Mid-Tex Gas Division Addition 080.72691 37602 17,087
080 190 - Mid-Tex Gas Division Addition 080.72692 37602 320
080 190 - Mid-Tex Gas Division Addition 080.72695 37602 480,121
080 190 - Mid-Tex Gas Division Addition 080.72696 37602 1,894,567
080 190 - Mid-Tex Gas Division Addition 080.72696 38000 534,365
080 190 - Mid-Tex Gas Division Addition 080.72698 38000 (624)
080 190 - Mid-Tex Gas Division Addition 080.72698 38500 (936)
080 190 - Mid-Tex Gas Division Addition 080.72700 37601 364,864
080 190 - Mid-Tex Gas Division Addition 080.72700 37800 851,349
080 190 - Mid-Tex Gas Division Addition 080.72704 37602 (11,293)
080 190 - Mid-Tex Gas Division Addition 080.72704 38000 26,030
080 190 - Mid-Tex Gas Division Addition 080.72704 38100 1,212
080 190 - Mid-Tex Gas Division Addition 080.72705 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72707 37601 37,446
080 190 - Mid-Tex Gas Division Addition 080.72709 37602 21,434
080 190 - Mid-Tex Gas Division Addition 080.72709 38000 2,381
080 190 - Mid-Tex Gas Division Addition 080.72723 37602 807
080 190 - Mid-Tex Gas Division Addition 080.72724 37602 10,356
080 190 - Mid-Tex Gas Division Addition 080.72726 37602 820,142
080 190 - Mid-Tex Gas Division Addition 080.72726 38000 91,127
080 190 - Mid-Tex Gas Division Addition 080.72730 37602 408
080 190 - Mid-Tex Gas Division Addition 080.72737 37602 (23,774)
080 190 - Mid-Tex Gas Division Addition 080.72738 37602 2,167
080 190 - Mid-Tex Gas Division Addition 080.72738 38000 114
080 190 - Mid-Tex Gas Division Addition 080.72741 37602 10,185
080 190 - Mid-Tex Gas Division Addition 080.72742 37602 260,407
080 190 - Mid-Tex Gas Division Addition 080.72742 38000 2,630
080 190 - Mid-Tex Gas Division Addition 080.72743 37602 15,201
080 190 - Mid-Tex Gas Division Addition 080.72743 38000 1,689
080 190 - Mid-Tex Gas Division Addition 080.72744 37602 (3,166)
080 190 - Mid-Tex Gas Division Addition 080.72744 38000 352
080 190 - Mid-Tex Gas Division Addition 080.72746 37602 13,289
080 190 - Mid-Tex Gas Division Addition 080.72747 37602 386,169
080 190 - Mid-Tex Gas Division Addition 080.72751 37601 3,645,576
080 190 - Mid-Tex Gas Division Addition 080.72751 37800 911,394
080 190 - Mid-Tex Gas Division Addition 080.72752 37602 7,802
080 190 - Mid-Tex Gas Division Addition 080.72754 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72755 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72756 37601 17,746
080 190 - Mid-Tex Gas Division Addition 080.72757 37602 4,990
080 190 - Mid-Tex Gas Division Addition 080.72757 38000 263
080 190 - Mid-Tex Gas Division Addition 080.72758 37602 12,207
080 190 - Mid-Tex Gas Division Addition 080.72759 37601 350,048
080 190 - Mid-Tex Gas Division Addition 080.72759 37800 61,773
080 190 - Mid-Tex Gas Division Addition 080.72760 37602 544,948
080 190 - Mid-Tex Gas Division Addition 080.72760 38000 96,167
080 190 - Mid-Tex Gas Division Addition 080.72762 37602 46,248
080 190 - Mid-Tex Gas Division Addition 080.72762 38000 5,139
080 190 - Mid-Tex Gas Division Addition 080.72763 37602 1,001,973
080 190 - Mid-Tex Gas Division Addition 080.72763 38000 111,330
080 190 - Mid-Tex Gas Division Addition 080.72764 37601 2,933,920
080 190 - Mid-Tex Gas Division Addition 080.72764 37602 40,191
080 190 - Mid-Tex Gas Division Addition 080.72764 37800 924,386
080 190 - Mid-Tex Gas Division Addition 080.72764 38000 120,572
080 190 - Mid-Tex Gas Division Addition 080.72765 37602 15,538
080 190 - Mid-Tex Gas Division Addition 080.72765 38000 1,351
080 190 - Mid-Tex Gas Division Addition 080.72767 37602 508
080 190 - Mid-Tex Gas Division Addition 080.72767 38000 44
080 190 - Mid-Tex Gas Division Addition 080.72773 37602 9,626
080 190 - Mid-Tex Gas Division Addition 080.72773 38000 2,406
080 190 - Mid-Tex Gas Division Addition 080.72775 37602 1,801
080 190 - Mid-Tex Gas Division Addition 080.72775 38000 95
080 190 - Mid-Tex Gas Division Addition 080.72776 37602 (29)
080 190 - Mid-Tex Gas Division Addition 080.72780 37602 17,356
080 190 - Mid-Tex Gas Division Addition 080.72780 38000 3,123
080 190 - Mid-Tex Gas Division Addition 080.72782 37602 483
080 190 - Mid-Tex Gas Division Addition 080.72783 37602 629
080 190 - Mid-Tex Gas Division Addition 080.72784 37602 321,964
080 190 - Mid-Tex Gas Division Addition 080.72785 37602 9,780
080 190 - Mid-Tex Gas Division Addition 080.72785 38000 1,726
080 190 - Mid-Tex Gas Division Addition 080.72786 37602 1,898
080 190 - Mid-Tex Gas Division Addition 080.72788 37602 1,437
080 190 - Mid-Tex Gas Division Addition 080.72788 38000 0
080 190 - Mid-Tex Gas Division Addition 080.72789 37602 10,078
080 190 - Mid-Tex Gas Division Addition 080.72795 37602 350
080 190 - Mid-Tex Gas Division Addition 080.72800 37602 881
080 190 - Mid-Tex Gas Division Addition 080.72801 38000 24,238
080 190 - Mid-Tex Gas Division Addition 080.72802 37602 1,728
080 190 - Mid-Tex Gas Division Addition 080.72809 37602 11,433
MTX Additions by FERC
Page 68 of 101
466
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.72809 38000 602
080 190 - Mid-Tex Gas Division Addition 080.72811 37601 218
080 190 - Mid-Tex Gas Division Addition 080.72811 37800 42
080 190 - Mid-Tex Gas Division Addition 080.72816 37602 321
080 190 - Mid-Tex Gas Division Addition 080.72818 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72819 37602 333,268
080 190 - Mid-Tex Gas Division Addition 080.72825 37602 26,721
080 190 - Mid-Tex Gas Division Addition 080.72825 38000 435
080 190 - Mid-Tex Gas Division Addition 080.72826 37602 119
080 190 - Mid-Tex Gas Division Addition 080.72829 37602 51,989
080 190 - Mid-Tex Gas Division Addition 080.72831 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72832 37800 964
080 190 - Mid-Tex Gas Division Addition 080.72834 37602 242,609
080 190 - Mid-Tex Gas Division Addition 080.72835 37800 177,642
080 190 - Mid-Tex Gas Division Addition 080.72837 37602 35,549
080 190 - Mid-Tex Gas Division Addition 080.72837 38000 8,888
080 190 - Mid-Tex Gas Division Addition 080.72839 37602 52,471
080 190 - Mid-Tex Gas Division Addition 080.72840 37602 1,749,962
080 190 - Mid-Tex Gas Division Addition 080.72840 38000 583,321
080 190 - Mid-Tex Gas Division Addition 080.72841 37602 84,411
080 190 - Mid-Tex Gas Division Addition 080.72846 37602 4,476
080 190 - Mid-Tex Gas Division Addition 080.72847 37602 373
080 190 - Mid-Tex Gas Division Addition 080.72848 37602 288
080 190 - Mid-Tex Gas Division Addition 080.72849 37602 1,355
080 190 - Mid-Tex Gas Division Addition 080.72855 37602 27,792
080 190 - Mid-Tex Gas Division Addition 080.72858 37602 151,048
080 190 - Mid-Tex Gas Division Addition 080.72860 37602 227,652
080 190 - Mid-Tex Gas Division Addition 080.72861 37602 177,289
080 190 - Mid-Tex Gas Division Addition 080.72862 37602 147,777
080 190 - Mid-Tex Gas Division Addition 080.72863 39400 22,336
080 190 - Mid-Tex Gas Division Addition 080.72866 37602 2,549
080 190 - Mid-Tex Gas Division Addition 080.72867 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72868 37602 1,755
080 190 - Mid-Tex Gas Division Addition 080.72869 37602 39,421
080 190 - Mid-Tex Gas Division Addition 080.72869 38000 4,380
080 190 - Mid-Tex Gas Division Addition 080.72871 37602 (4,803)
080 190 - Mid-Tex Gas Division Addition 080.72872 37602 3,067
080 190 - Mid-Tex Gas Division Addition 080.72872 38000 292
080 190 - Mid-Tex Gas Division Addition 080.72874 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72878 37602 71,305
080 190 - Mid-Tex Gas Division Addition 080.72880 37602 21,496
080 190 - Mid-Tex Gas Division Addition 080.72883 37602 206
080 190 - Mid-Tex Gas Division Addition 080.72884 37602 1,526
080 190 - Mid-Tex Gas Division Addition 080.72884 38000 170
080 190 - Mid-Tex Gas Division Addition 080.72885 38000 205,035
080 190 - Mid-Tex Gas Division Addition 080.72886 38000 86,337
080 190 - Mid-Tex Gas Division Addition 080.72888 37602 588
080 190 - Mid-Tex Gas Division Addition 080.72889 37602 478,165
080 190 - Mid-Tex Gas Division Addition 080.72891 37601 5,157
080 190 - Mid-Tex Gas Division Addition 080.72891 37602 12,894
080 190 - Mid-Tex Gas Division Addition 080.72891 37800 7,736
080 190 - Mid-Tex Gas Division Addition 080.72899 37602 3,807
080 190 - Mid-Tex Gas Division Addition 080.72905 37602 40,508
080 190 - Mid-Tex Gas Division Addition 080.72906 37602 666,856
080 190 - Mid-Tex Gas Division Addition 080.72906 38000 222,285
080 190 - Mid-Tex Gas Division Addition 080.72910 37602 4,542
080 190 - Mid-Tex Gas Division Addition 080.72910 38000 239
080 190 - Mid-Tex Gas Division Addition 080.72912 37602 (65)
080 190 - Mid-Tex Gas Division Addition 080.72914 37602 (185)
080 190 - Mid-Tex Gas Division Addition 080.72921 37602 4,821
080 190 - Mid-Tex Gas Division Addition 080.72921 38000 536
080 190 - Mid-Tex Gas Division Addition 080.72922 37601 155
080 190 - Mid-Tex Gas Division Addition 080.72923 37602 1,485
080 190 - Mid-Tex Gas Division Addition 080.72924 37602 837
080 190 - Mid-Tex Gas Division Addition 080.72926 37600 111,819
080 190 - Mid-Tex Gas Division Addition 080.72927 37600 2,684
080 190 - Mid-Tex Gas Division Addition 080.72928 37600 8,124
080 190 - Mid-Tex Gas Division Addition 080.72929 37600 -
080 190 - Mid-Tex Gas Division Addition 080.72930 37602 384,155
080 190 - Mid-Tex Gas Division Addition 080.72935 37602 96,420
080 190 - Mid-Tex Gas Division Addition 080.72935 38000 17,015
080 190 - Mid-Tex Gas Division Addition 080.72947 37602 143
080 190 - Mid-Tex Gas Division Addition 080.72948 37602 188
080 190 - Mid-Tex Gas Division Addition 080.72949 37800 (59)
080 190 - Mid-Tex Gas Division Addition 080.72951 37602 365
080 190 - Mid-Tex Gas Division Addition 080.72954 37602 63,380
080 190 - Mid-Tex Gas Division Addition 080.72954 38000 1,293
080 190 - Mid-Tex Gas Division Addition 080.72956 37602 329
080 190 - Mid-Tex Gas Division Addition 080.72959 37602 8,831
080 190 - Mid-Tex Gas Division Addition 080.72959 38000 465
080 190 - Mid-Tex Gas Division Addition 080.72960 37602 29,422
080 190 - Mid-Tex Gas Division Addition 080.72960 38000 3,269
080 190 - Mid-Tex Gas Division Addition 080.72961 37602 -
080 190 - Mid-Tex Gas Division Addition 080.72965 37602 262
080 190 - Mid-Tex Gas Division Addition 080.72967 37602 12
080 190 - Mid-Tex Gas Division Addition 080.72969 37602 6,445
080 190 - Mid-Tex Gas Division Addition 080.72969 38000 1,137
080 190 - Mid-Tex Gas Division Addition 080.72970 37602 57,192
080 190 - Mid-Tex Gas Division Addition 080.72970 38000 3,010
080 190 - Mid-Tex Gas Division Addition 080.72973 37602 22,834
080 190 - Mid-Tex Gas Division Addition 080.72973 38000 9,786
080 190 - Mid-Tex Gas Division Addition 080.72974 37602 5,673
080 190 - Mid-Tex Gas Division Addition 080.72975 37602 68,289
080 190 - Mid-Tex Gas Division Addition 080.72975 38000 3,594
080 190 - Mid-Tex Gas Division Addition 080.72978 37602 14,422
080 190 - Mid-Tex Gas Division Addition 080.72978 38000 759
080 190 - Mid-Tex Gas Division Addition 080.72982 37602 238,219
080 190 - Mid-Tex Gas Division Addition 080.72983 37602 21,457
080 190 - Mid-Tex Gas Division Addition 080.72983 38000 5,364
080 190 - Mid-Tex Gas Division Addition 080.72987 37602 254,480
080 190 - Mid-Tex Gas Division Addition 080.72987 38000 137,028
080 190 - Mid-Tex Gas Division Addition 080.72988 37602 350,523
080 190 - Mid-Tex Gas Division Addition 080.72988 38000 61,857
080 190 - Mid-Tex Gas Division Addition 080.72989 37602 1,021
080 190 - Mid-Tex Gas Division Addition 080.72990 37602 136,295
080 190 - Mid-Tex Gas Division Addition 080.72990 38000 58,412
080 190 - Mid-Tex Gas Division Addition 080.72991 37602 345,528
MTX Additions by FERC
Page 69 of 101
467
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.72991 38000 148,084
080 190 - Mid-Tex Gas Division Addition 080.73006 37602 238
080 190 - Mid-Tex Gas Division Addition 080.73007 37602 10,432
080 190 - Mid-Tex Gas Division Addition 080.73007 38000 1,159
080 190 - Mid-Tex Gas Division Addition 080.73018 37602 420,888
080 190 - Mid-Tex Gas Division Addition 080.73019 37602 67,047
080 190 - Mid-Tex Gas Division Addition 080.73023 37602 54,192
080 190 - Mid-Tex Gas Division Addition 080.73024 37602 76,312
080 190 - Mid-Tex Gas Division Addition 080.73024 38000 42,926
080 190 - Mid-Tex Gas Division Addition 080.73025 37602 47,639
080 190 - Mid-Tex Gas Division Addition 080.73025 38000 11,910
080 190 - Mid-Tex Gas Division Addition 080.73026 37602 43,111
080 190 - Mid-Tex Gas Division Addition 080.73026 38000 14,370
080 190 - Mid-Tex Gas Division Addition 080.73027 37602 124,029
080 190 - Mid-Tex Gas Division Addition 080.73027 38000 53,155
080 190 - Mid-Tex Gas Division Addition 080.73028 37602 18,449
080 190 - Mid-Tex Gas Division Addition 080.73028 38000 12,299
080 190 - Mid-Tex Gas Division Addition 080.73029 37602 29,186
080 190 - Mid-Tex Gas Division Addition 080.73029 38000 5,559
080 190 - Mid-Tex Gas Division Addition 080.73030 37602 128,470
080 190 - Mid-Tex Gas Division Addition 080.73030 38000 42,823
080 190 - Mid-Tex Gas Division Addition 080.73031 37602 56,122
080 190 - Mid-Tex Gas Division Addition 080.73031 38000 18,707
080 190 - Mid-Tex Gas Division Addition 080.73032 37602 47,442
080 190 - Mid-Tex Gas Division Addition 080.73032 38000 30,331
080 190 - Mid-Tex Gas Division Addition 080.73033 37602 52,494
080 190 - Mid-Tex Gas Division Addition 080.73033 38000 23,037
080 190 - Mid-Tex Gas Division Addition 080.73039 37602 23,307
080 190 - Mid-Tex Gas Division Addition 080.73046 37602 347
080 190 - Mid-Tex Gas Division Addition 080.73049 39000 -
080 190 - Mid-Tex Gas Division Addition 080.73050 37602 8,444
080 190 - Mid-Tex Gas Division Addition 080.73053 37602 32,271
080 190 - Mid-Tex Gas Division Addition 080.73053 38000 5,695
080 190 - Mid-Tex Gas Division Addition 080.73058 37602 4,080
080 190 - Mid-Tex Gas Division Addition 080.73058 38000 1,020
080 190 - Mid-Tex Gas Division Addition 080.73061 37602 481
080 190 - Mid-Tex Gas Division Addition 080.73068 37602 10,356
080 190 - Mid-Tex Gas Division Addition 080.73068 38000 1,151
080 190 - Mid-Tex Gas Division Addition 080.73070 37601 21,441
080 190 - Mid-Tex Gas Division Addition 080.73071 37602 15,632
080 190 - Mid-Tex Gas Division Addition 080.73071 37800 29,032
080 190 - Mid-Tex Gas Division Addition 080.73079 37602 6,626
080 190 - Mid-Tex Gas Division Addition 080.73083 37602 27,424
080 190 - Mid-Tex Gas Division Addition 080.73083 38000 12,905
080 190 - Mid-Tex Gas Division Addition 080.73084 37602 -
080 190 - Mid-Tex Gas Division Addition 080.73086 37602 157
080 190 - Mid-Tex Gas Division Addition 080.73088 37602 2,435
080 190 - Mid-Tex Gas Division Addition 080.73089 37602 12,591
080 190 - Mid-Tex Gas Division Addition 080.73089 37800 50,364
080 190 - Mid-Tex Gas Division Addition 080.73091 37602 7,378
080 190 - Mid-Tex Gas Division Addition 080.73094 37602 6,668
080 190 - Mid-Tex Gas Division Addition 080.73094 38000 7,313
080 190 - Mid-Tex Gas Division Addition 080.73098 37602 5,594
080 190 - Mid-Tex Gas Division Addition 080.73098 38000 294
080 190 - Mid-Tex Gas Division Addition 080.73103 37602 -
080 190 - Mid-Tex Gas Division Addition 080.73107 37602 22,066
080 190 - Mid-Tex Gas Division Addition 080.73107 38000 1,161
080 190 - Mid-Tex Gas Division Addition 080.73110 37602 66
080 190 - Mid-Tex Gas Division Addition 080.73111 37602 28,843
080 190 - Mid-Tex Gas Division Addition 080.73111 38000 3,933
080 190 - Mid-Tex Gas Division Addition 080.73112 37602 12,645
080 190 - Mid-Tex Gas Division Addition 080.73112 38000 3,161
080 190 - Mid-Tex Gas Division Addition 080.73114 37602 34,473
080 190 - Mid-Tex Gas Division Addition 080.73119 37602 -
080 190 - Mid-Tex Gas Division Addition 080.73123 37602 65,219
080 190 - Mid-Tex Gas Division Addition 080.73131 37602 183
080 190 - Mid-Tex Gas Division Addition 080.73133 37602 748
080 190 - Mid-Tex Gas Division Addition 080.73134 37602 (68)
080 190 - Mid-Tex Gas Division Addition 080.73135 37602 2,340
080 190 - Mid-Tex Gas Division Addition 080.73135 38000 413
080 190 - Mid-Tex Gas Division Addition 080.73137 37602 4,327
080 190 - Mid-Tex Gas Division Addition 080.73137 38000 2,885
080 190 - Mid-Tex Gas Division Addition 080.73138 37602 177,103
080 190 - Mid-Tex Gas Division Addition 080.73139 37602 1,298
080 190 - Mid-Tex Gas Division Addition 080.73140 37602 2,211
080 190 - Mid-Tex Gas Division Addition 080.73141 37602 43,991
080 190 - Mid-Tex Gas Division Addition 080.73142 37602 24,382
080 190 - Mid-Tex Gas Division Addition 080.73143 37602 2,101,920
080 190 - Mid-Tex Gas Division Addition 080.73147 37602 2,784
080 190 - Mid-Tex Gas Division Addition 080.73147 37800 2,505
080 190 - Mid-Tex Gas Division Addition 080.73147 38000 278
080 190 - Mid-Tex Gas Division Addition 080.73148 37602 1,362
080 190 - Mid-Tex Gas Division Addition 080.73153 37602 140,929
080 190 - Mid-Tex Gas Division Addition 080.73155 37602 3,115
080 190 - Mid-Tex Gas Division Addition 080.73158 37602 12,805
080 190 - Mid-Tex Gas Division Addition 080.73159 37602 274,004
080 190 - Mid-Tex Gas Division Addition 080.73159 38000 14,421
080 190 - Mid-Tex Gas Division Addition 080.73163 37602 1,632
080 190 - Mid-Tex Gas Division Addition 080.73164 37602 385,284
080 190 - Mid-Tex Gas Division Addition 080.73164 38000 96,321
080 190 - Mid-Tex Gas Division Addition 080.73165 37602 4,353
080 190 - Mid-Tex Gas Division Addition 080.73165 38000 158
080 190 - Mid-Tex Gas Division Addition 080.73169 37601 2,757
080 190 - Mid-Tex Gas Division Addition 080.73169 37602 87,313
080 190 - Mid-Tex Gas Division Addition 080.73169 38000 1,838
080 190 - Mid-Tex Gas Division Addition 080.73171 37602 117,570
080 190 - Mid-Tex Gas Division Addition 080.73173 37602 81,001
080 190 - Mid-Tex Gas Division Addition 080.73174 37602 892
080 190 - Mid-Tex Gas Division Addition 080.73174 38000 298
080 190 - Mid-Tex Gas Division Addition 080.73175 37602 13,621
080 190 - Mid-Tex Gas Division Addition 080.73182 37602 1,815,878
080 190 - Mid-Tex Gas Division Addition 080.73182 38000 425,947
080 190 - Mid-Tex Gas Division Addition 080.73183 37602 4,556
080 190 - Mid-Tex Gas Division Addition 080.73184 37602 451
080 190 - Mid-Tex Gas Division Addition 080.73192 37602 1,662,850
080 190 - Mid-Tex Gas Division Addition 080.73193 37602 48,879
080 190 - Mid-Tex Gas Division Addition 080.73194 37602 61,299
MTX Additions by FERC
Page 70 of 101
468
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.73194 38000 10,818
080 190 - Mid-Tex Gas Division Addition 080.73199 37602 1,230
080 190 - Mid-Tex Gas Division Addition 080.73206 37602 -
080 190 - Mid-Tex Gas Division Addition 080.73210 37601 488
080 190 - Mid-Tex Gas Division Addition 080.73214 37602 3,013
080 190 - Mid-Tex Gas Division Addition 080.73215 37602 54
080 190 - Mid-Tex Gas Division Addition 080.73216 37602 70,211
080 190 - Mid-Tex Gas Division Addition 080.73220 37602 10,094
080 190 - Mid-Tex Gas Division Addition 080.73220 38000 (7,661)
080 190 - Mid-Tex Gas Division Addition 080.73221 37602 13,199
080 190 - Mid-Tex Gas Division Addition 080.73221 38000 10,799
080 190 - Mid-Tex Gas Division Addition 080.73224 37602 5,686
080 190 - Mid-Tex Gas Division Addition 080.73224 38000 2,437
080 190 - Mid-Tex Gas Division Addition 080.73225 37602 75,432
080 190 - Mid-Tex Gas Division Addition 080.73226 37602 20,410
080 190 - Mid-Tex Gas Division Addition 080.73226 38000 13,607
080 190 - Mid-Tex Gas Division Addition 080.73228 37602 16,784
080 190 - Mid-Tex Gas Division Addition 080.73228 38000 13,732
080 190 - Mid-Tex Gas Division Addition 080.73230 37602 17,450
080 190 - Mid-Tex Gas Division Addition 080.73233 37602 12,518
080 190 - Mid-Tex Gas Division Addition 080.73235 37602 3,709
080 190 - Mid-Tex Gas Division Addition 080.73238 37602 109,505
080 190 - Mid-Tex Gas Division Addition 080.73241 37602 42,801
080 190 - Mid-Tex Gas Division Addition 080.73245 37602 226,079
080 190 - Mid-Tex Gas Division Addition 080.73246 37602 76,784
080 190 - Mid-Tex Gas Division Addition 080.73247 37602 3,113
080 190 - Mid-Tex Gas Division Addition 080.73251 37602 133
080 190 - Mid-Tex Gas Division Addition 080.73252 37602 7,610
080 190 - Mid-Tex Gas Division Addition 080.73252 38000 -
080 190 - Mid-Tex Gas Division Addition 080.73253 37602 564
080 190 - Mid-Tex Gas Division Addition 080.73254 38000 51,334
080 190 - Mid-Tex Gas Division Addition 080.73255 37602 12,700
080 190 - Mid-Tex Gas Division Addition 080.73256 37602 801
080 190 - Mid-Tex Gas Division Addition 080.73257 37602 520
080 190 - Mid-Tex Gas Division Addition 080.73259 37602 1,832
080 190 - Mid-Tex Gas Division Addition 080.73260 37800 762
080 190 - Mid-Tex Gas Division Addition 080.73261 37602 52,861
080 190 - Mid-Tex Gas Division Addition 080.73263 37602 (28)
080 190 - Mid-Tex Gas Division Addition 080.73265 38000 18,785
080 190 - Mid-Tex Gas Division Addition 080.73266 38000 18,451
080 190 - Mid-Tex Gas Division Addition 080.73267 37602 9,542
080 190 - Mid-Tex Gas Division Addition 080.73267 38000 1,060
080 190 - Mid-Tex Gas Division Addition 080.73269 37602 185,256
080 190 - Mid-Tex Gas Division Addition 080.73273 37602 47,646
080 190 - Mid-Tex Gas Division Addition 080.73273 38000 31,764
080 190 - Mid-Tex Gas Division Addition 080.73280 37602 -
080 190 - Mid-Tex Gas Division Addition 080.73283 37602 4,945
080 190 - Mid-Tex Gas Division Addition 080.73283 38000 873
080 190 - Mid-Tex Gas Division Addition 080.73284 37602 6,432
080 190 - Mid-Tex Gas Division Addition 080.73285 37602 80,973
080 190 - Mid-Tex Gas Division Addition 080.73286 37602 15,578
080 190 - Mid-Tex Gas Division Addition 080.73288 37602 4,804
080 190 - Mid-Tex Gas Division Addition 080.73288 38000 655
080 190 - Mid-Tex Gas Division Addition 080.73293 38000 2,261
080 190 - Mid-Tex Gas Division Addition 080.73297 37602 24,854
080 190 - Mid-Tex Gas Division Addition 080.73300 37602 80,861
080 190 - Mid-Tex Gas Division Addition 080.73300 38000 4,256
080 190 - Mid-Tex Gas Division Addition 080.73301 37602 13
080 190 - Mid-Tex Gas Division Addition 080.73303 37602 -
080 190 - Mid-Tex Gas Division Addition 080.73304 37602 3,366
080 190 - Mid-Tex Gas Division Addition 080.73305 38000 52
080 190 - Mid-Tex Gas Division Addition 080.73306 37602 5,065
080 190 - Mid-Tex Gas Division Addition 080.73306 38000 267
080 190 - Mid-Tex Gas Division Addition 080.73308 37602 22,437
080 190 - Mid-Tex Gas Division Addition 080.73308 37800 1,320
080 190 - Mid-Tex Gas Division Addition 080.73308 38000 2,640
080 190 - Mid-Tex Gas Division Addition 080.73309 37602 9,301
080 190 - Mid-Tex Gas Division Addition 080.73309 38000 1,641
080 190 - Mid-Tex Gas Division Addition 080.73315 37602 733,653
080 190 - Mid-Tex Gas Division Addition 080.73322 37602 1,555,083
080 190 - Mid-Tex Gas Division Addition 080.73322 38000 99,261
080 190 - Mid-Tex Gas Division Addition 080.73326 37602 801
080 190 - Mid-Tex Gas Division Addition 080.73327 37602 1,465
080 190 - Mid-Tex Gas Division Addition 080.73327 38000 15
080 190 - Mid-Tex Gas Division Addition 080.73328 37602 215,755
080 190 - Mid-Tex Gas Division Addition 080.73329 37602 135,463
080 190 - Mid-Tex Gas Division Addition 080.73329 38000 7,130
080 190 - Mid-Tex Gas Division Addition 080.73335 37602 285
080 190 - Mid-Tex Gas Division Addition 080.73342 37602 72,174
080 190 - Mid-Tex Gas Division Addition 080.73342 37800 72,174
080 190 - Mid-Tex Gas Division Addition 080.73343 37602 1,792
080 190 - Mid-Tex Gas Division Addition 080.73347 37602 2,029
080 190 - Mid-Tex Gas Division Addition 080.73347 37800 1,353
080 190 - Mid-Tex Gas Division Addition 080.73348 37602 2,186
080 190 - Mid-Tex Gas Division Addition 080.73349 37602 0
080 190 - Mid-Tex Gas Division Addition 080.73350 37602 16,382
080 190 - Mid-Tex Gas Division Addition 080.73351 37602 (66)
080 190 - Mid-Tex Gas Division Addition 080.73352 37601 958,394
080 190 - Mid-Tex Gas Division Addition 080.73357 37602 -
080 190 - Mid-Tex Gas Division Addition 080.73358 37602 32,808
080 190 - Mid-Tex Gas Division Addition 080.73358 38000 14,061
080 190 - Mid-Tex Gas Division Addition 080.73361 37602 4,184
080 190 - Mid-Tex Gas Division Addition 080.73362 37602 257
080 190 - Mid-Tex Gas Division Addition 080.73362 38000 14
080 190 - Mid-Tex Gas Division Addition 080.73371 37602 224,112
080 190 - Mid-Tex Gas Division Addition 080.73371 38000 74,704
080 190 - Mid-Tex Gas Division Addition 080.73372 39500 (48,696)
080 190 - Mid-Tex Gas Division Addition 080.73375 37602 265,261
080 190 - Mid-Tex Gas Division Addition 080.73379 37602 2,372
080 190 - Mid-Tex Gas Division Addition 080.73379 38000 125
080 190 - Mid-Tex Gas Division Addition 080.73380 37602 107
080 190 - Mid-Tex Gas Division Addition 080.73382 37602 615
080 190 - Mid-Tex Gas Division Addition 080.73384 37602 2,075
080 190 - Mid-Tex Gas Division Addition 080.73386 37602 1,983
080 190 - Mid-Tex Gas Division Addition 080.73387 37602 64,474
080 190 - Mid-Tex Gas Division Addition 080.73388 37602 25,434
080 190 - Mid-Tex Gas Division Addition 080.73389 37602 706
MTX Additions by FERC
Page 71 of 101
469
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.73389 38000 37
080 190 - Mid-Tex Gas Division Addition 080.73390 37602 253,790
080 190 - Mid-Tex Gas Division Addition 080.73391 37602 1,788
080 190 - Mid-Tex Gas Division Addition 080.73393 39000 2,300,598
080 190 - Mid-Tex Gas Division Addition 080.73399 37602 9,838,806
080 190 - Mid-Tex Gas Division Addition 080.73405 37602 13,628
080 190 - Mid-Tex Gas Division Addition 080.73405 38000 2,405
080 190 - Mid-Tex Gas Division Addition 080.73406 37602 7,310
080 190 - Mid-Tex Gas Division Addition 080.73406 38000 1,290
080 190 - Mid-Tex Gas Division Addition 080.73407 37602 13,742
080 190 - Mid-Tex Gas Division Addition 080.73407 38000 5,890
080 190 - Mid-Tex Gas Division Addition 080.73410 37602 6,308
080 190 - Mid-Tex Gas Division Addition 080.73410 38000 2,703
080 190 - Mid-Tex Gas Division Addition 080.73411 37602 553,110
080 190 - Mid-Tex Gas Division Addition 080.73411 38000 138,277
080 190 - Mid-Tex Gas Division Addition 080.73413 37602 15,118
080 190 - Mid-Tex Gas Division Addition 080.73413 38000 3,779
080 190 - Mid-Tex Gas Division Addition 080.73414 37602 -
080 190 - Mid-Tex Gas Division Addition 080.73430 37602 223
080 190 - Mid-Tex Gas Division Addition 080.73439 37602 897
080 190 - Mid-Tex Gas Division Addition 080.73442 37602 16,009
080 190 - Mid-Tex Gas Division Addition 080.73442 38000 5,336
080 190 - Mid-Tex Gas Division Addition 080.73443 38000 4,599
080 190 - Mid-Tex Gas Division Addition 080.73450 37602 22,856
080 190 - Mid-Tex Gas Division Addition 080.73450 38000 1,203
080 190 - Mid-Tex Gas Division Addition 080.73451 37602 21,265
080 190 - Mid-Tex Gas Division Addition 080.73452 37602 145,632
080 190 - Mid-Tex Gas Division Addition 080.73452 38000 7,665
080 190 - Mid-Tex Gas Division Addition 080.73453 37602 28,454
080 190 - Mid-Tex Gas Division Addition 080.73453 38000 229
080 190 - Mid-Tex Gas Division Addition 080.73454 37602 393,765
080 190 - Mid-Tex Gas Division Addition 080.73454 38000 14,282
080 190 - Mid-Tex Gas Division Addition 080.73455 37602 566,648
080 190 - Mid-Tex Gas Division Addition 080.73455 38000 21,161
080 190 - Mid-Tex Gas Division Addition 080.73457 37602 1,215,644
080 190 - Mid-Tex Gas Division Addition 080.73457 38000 50,652
080 190 - Mid-Tex Gas Division Addition 080.73460 37602 174,428
080 190 - Mid-Tex Gas Division Addition 080.73460 38000 19,381
080 190 - Mid-Tex Gas Division Addition 080.73462 37602 139,209
080 190 - Mid-Tex Gas Division Addition 080.73462 38000 15,468
080 190 - Mid-Tex Gas Division Addition 080.73463 37602 79
080 190 - Mid-Tex Gas Division Addition 080.73468 37602 33,114
080 190 - Mid-Tex Gas Division Addition 080.73468 38000 2,114
080 190 - Mid-Tex Gas Division Addition 080.73472 38500 27,141
080 190 - Mid-Tex Gas Division Addition 080.73473 37900 2,232
080 190 - Mid-Tex Gas Division Addition 080.73474 37602 658
080 190 - Mid-Tex Gas Division Addition 080.73479 37602 7,210
080 190 - Mid-Tex Gas Division Addition 080.73479 38000 380
080 190 - Mid-Tex Gas Division Addition 080.73480 37602 3,344
080 190 - Mid-Tex Gas Division Addition 080.73481 39906 22,239
080 190 - Mid-Tex Gas Division Addition 080.73485 37602 186
080 190 - Mid-Tex Gas Division Addition 080.73490 37602 (2)
080 190 - Mid-Tex Gas Division Addition 080.73490 38000 (178)
080 190 - Mid-Tex Gas Division Addition 080.73490 38100 (8,301)
080 190 - Mid-Tex Gas Division Addition 080.73490 38500 (57)
080 190 - Mid-Tex Gas Division Addition 080.73493 37601 15,120
080 190 - Mid-Tex Gas Division Addition 080.73493 37602 105,839
080 190 - Mid-Tex Gas Division Addition 080.73493 37800 30,262
080 190 - Mid-Tex Gas Division Addition 080.73494 39400 -
080 190 - Mid-Tex Gas Division Addition 080.73496 37602 1,152
080 190 - Mid-Tex Gas Division Addition 080.73497 37602 397,331
080 190 - Mid-Tex Gas Division Addition 080.73497 38000 139,603
080 190 - Mid-Tex Gas Division Addition 080.73499 37602 80
080 190 - Mid-Tex Gas Division Addition 080.73505 37602 855
080 190 - Mid-Tex Gas Division Addition 080.73506 37602 133
080 190 - Mid-Tex Gas Division Addition 080.73508 37602 12,735
080 190 - Mid-Tex Gas Division Addition 080.73508 38000 3,184
080 190 - Mid-Tex Gas Division Addition 080.73509 37602 4,302
080 190 - Mid-Tex Gas Division Addition 080.73514 37602 824,189
080 190 - Mid-Tex Gas Division Addition 080.73514 38000 43,378
080 190 - Mid-Tex Gas Division Addition 080.73517 37602 979,627
080 190 - Mid-Tex Gas Division Addition 080.73517 38000 442,845
080 190 - Mid-Tex Gas Division Addition 080.73521 37602 (4,389)
080 190 - Mid-Tex Gas Division Addition 080.73521 38000 (1,951)
080 190 - Mid-Tex Gas Division Addition 080.73521 38500 (3,414)
080 190 - Mid-Tex Gas Division Addition 080.73522 37602 12,199
080 190 - Mid-Tex Gas Division Addition 080.73523 37602 34,628
080 190 - Mid-Tex Gas Division Addition 080.73523 38000 2,210
080 190 - Mid-Tex Gas Division Addition 080.73524 37602 48,693
080 190 - Mid-Tex Gas Division Addition 080.73530 37602 39,400
080 190 - Mid-Tex Gas Division Addition 080.73531 37602 69,812
080 190 - Mid-Tex Gas Division Addition 080.73531 38000 7,757
080 190 - Mid-Tex Gas Division Addition 080.73537 37602 210,733
080 190 - Mid-Tex Gas Division Addition 080.73546 37602 -
080 190 - Mid-Tex Gas Division Addition 080.73549 37602 -
080 190 - Mid-Tex Gas Division Addition 080.73550 37602 -
080 190 - Mid-Tex Gas Division Addition 080.73555 37602 (13)
080 190 - Mid-Tex Gas Division Addition 080.73556 37602 -
080 190 - Mid-Tex Gas Division Addition 080.73557 37601 11,033
080 190 - Mid-Tex Gas Division Addition 080.73557 37602 198,591
080 190 - Mid-Tex Gas Division Addition 080.73557 38000 11,033
080 190 - Mid-Tex Gas Division Addition 080.73558 37602 18,010
080 190 - Mid-Tex Gas Division Addition 080.73558 38000 7,719
080 190 - Mid-Tex Gas Division Addition 080.73560 37602 5,343
080 190 - Mid-Tex Gas Division Addition 080.73561 37602 -
080 190 - Mid-Tex Gas Division Addition 080.73562 37602 1,015
080 190 - Mid-Tex Gas Division Addition 080.73574 37602 5,747
080 190 - Mid-Tex Gas Division Addition 080.73574 38000 303
080 190 - Mid-Tex Gas Division Addition 080.73575 37602 412,912
080 190 - Mid-Tex Gas Division Addition 080.73575 38000 109,762
080 190 - Mid-Tex Gas Division Addition 080.73576 37602 8,883
080 190 - Mid-Tex Gas Division Addition 080.73576 38000 90
080 190 - Mid-Tex Gas Division Addition 080.73579 37602 689,335
080 190 - Mid-Tex Gas Division Addition 080.73579 38000 103,004
080 190 - Mid-Tex Gas Division Addition 080.73581 37602 324
080 190 - Mid-Tex Gas Division Addition 080.73581 37800 755
080 190 - Mid-Tex Gas Division Addition 080.73585 37602 -
MTX Additions by FERC
Page 72 of 101
470
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.73586 37602 4,813
080 190 - Mid-Tex Gas Division Addition 080.73586 38000 253
080 190 - Mid-Tex Gas Division Addition 080.73587 37602 316,717
080 190 - Mid-Tex Gas Division Addition 080.73587 38000 123,168
080 190 - Mid-Tex Gas Division Addition 080.73589 37602 1,254
080 190 - Mid-Tex Gas Division Addition 080.73589 38000 66
080 190 - Mid-Tex Gas Division Addition 080.73591 37602 872
080 190 - Mid-Tex Gas Division Addition 080.73592 37602 248,330
080 190 - Mid-Tex Gas Division Addition 080.73592 38000 70,042
080 190 - Mid-Tex Gas Division Addition 080.73593 37602 55,573
080 190 - Mid-Tex Gas Division Addition 080.73593 38000 13,893
080 190 - Mid-Tex Gas Division Addition 080.73596 37601 (43,324)
080 190 - Mid-Tex Gas Division Addition 080.73601 37602 (11,209)
080 190 - Mid-Tex Gas Division Addition 080.73601 38000 (1,978)
080 190 - Mid-Tex Gas Division Addition 080.73602 38000 20,896
080 190 - Mid-Tex Gas Division Addition 080.73605 38000 67,869
080 190 - Mid-Tex Gas Division Addition 080.73614 37602 14,504
080 190 - Mid-Tex Gas Division Addition 080.73614 38000 510
080 190 - Mid-Tex Gas Division Addition 080.73616 38000 26,015
080 190 - Mid-Tex Gas Division Addition 080.73618 37602 29,703
080 190 - Mid-Tex Gas Division Addition 080.73618 38000 3,300
080 190 - Mid-Tex Gas Division Addition 080.73620 38000 18,273
080 190 - Mid-Tex Gas Division Addition 080.73625 37602 27,392
080 190 - Mid-Tex Gas Division Addition 080.73626 37602 432,976
080 190 - Mid-Tex Gas Division Addition 080.73626 38000 22,788
080 190 - Mid-Tex Gas Division Addition 080.73629 37602 922
080 190 - Mid-Tex Gas Division Addition 080.73634 37602 1,879
080 190 - Mid-Tex Gas Division Addition 080.73635 39400 -
080 190 - Mid-Tex Gas Division Addition 080.73639 37602 214
080 190 - Mid-Tex Gas Division Addition 080.73641 37602 1,869
080 190 - Mid-Tex Gas Division Addition 080.73641 38000 1,246
080 190 - Mid-Tex Gas Division Addition 080.73644 37602 8,196
080 190 - Mid-Tex Gas Division Addition 080.73644 38000 431
080 190 - Mid-Tex Gas Division Addition 080.73645 37602 4,709
080 190 - Mid-Tex Gas Division Addition 080.73651 37800 711
080 190 - Mid-Tex Gas Division Addition 080.73654 37601 -
080 190 - Mid-Tex Gas Division Addition 080.73654 37602 34,285
080 190 - Mid-Tex Gas Division Addition 080.73655 37602 819,817
080 190 - Mid-Tex Gas Division Addition 080.73655 38000 91,091
080 190 - Mid-Tex Gas Division Addition 080.73656 39400 -
080 190 - Mid-Tex Gas Division Addition 080.73657 37602 525,955
080 190 - Mid-Tex Gas Division Addition 080.73657 38000 58,439
080 190 - Mid-Tex Gas Division Addition 080.73662 37602 112,365
080 190 - Mid-Tex Gas Division Addition 080.73663 37602 149,310
080 190 - Mid-Tex Gas Division Addition 080.73664 37601 264
080 190 - Mid-Tex Gas Division Addition 080.73664 37602 1,322
080 190 - Mid-Tex Gas Division Addition 080.73664 37800 11,633
080 190 - Mid-Tex Gas Division Addition 080.73665 37602 9,285
080 190 - Mid-Tex Gas Division Addition 080.73666 37602 29,192
080 190 - Mid-Tex Gas Division Addition 080.73669 37602 1,064
080 190 - Mid-Tex Gas Division Addition 080.73671 37602 349,640
080 190 - Mid-Tex Gas Division Addition 080.73671 38000 87,410
080 190 - Mid-Tex Gas Division Addition 080.73672 37602 180,157
080 190 - Mid-Tex Gas Division Addition 080.73672 38000 20,017
080 190 - Mid-Tex Gas Division Addition 080.73673 37602 5,757
080 190 - Mid-Tex Gas Division Addition 080.73678 37602 306,740
080 190 - Mid-Tex Gas Division Addition 080.73678 38000 9,487
080 190 - Mid-Tex Gas Division Addition 080.73689 37602 21,529
080 190 - Mid-Tex Gas Division Addition 080.73689 38000 1,133
080 190 - Mid-Tex Gas Division Addition 080.73692 39000 -
080 190 - Mid-Tex Gas Division Addition 080.73694 37601 467
080 190 - Mid-Tex Gas Division Addition 080.73694 37602 1,336
080 190 - Mid-Tex Gas Division Addition 080.73694 37800 1,312
080 190 - Mid-Tex Gas Division Addition 080.73695 37602 -
080 190 - Mid-Tex Gas Division Addition 080.73696 39000 1
080 190 - Mid-Tex Gas Division Addition 080.73697 39000 -
080 190 - Mid-Tex Gas Division Addition 080.73698 39000 -
080 190 - Mid-Tex Gas Division Addition 080.73701 37602 462,318
080 190 - Mid-Tex Gas Division Addition 080.73701 38000 308,212
080 190 - Mid-Tex Gas Division Addition 080.73703 37602 149,208
080 190 - Mid-Tex Gas Division Addition 080.73703 38000 11,231
080 190 - Mid-Tex Gas Division Addition 080.73706 37602 15
080 190 - Mid-Tex Gas Division Addition 080.73710 37602 2,913
080 190 - Mid-Tex Gas Division Addition 080.73711 37602 (12,872)
080 190 - Mid-Tex Gas Division Addition 080.73714 39400 -
080 190 - Mid-Tex Gas Division Addition 080.73715 37602 676
080 190 - Mid-Tex Gas Division Addition 080.73715 38000 (231)
080 190 - Mid-Tex Gas Division Addition 080.73716 37602 18,280
080 190 - Mid-Tex Gas Division Addition 080.73718 37602 5,777
080 190 - Mid-Tex Gas Division Addition 080.73720 37602 11,640
080 190 - Mid-Tex Gas Division Addition 080.73720 38000 4,989
080 190 - Mid-Tex Gas Division Addition 080.73721 37602 (14,865)
080 190 - Mid-Tex Gas Division Addition 080.73721 37800 -
080 190 - Mid-Tex Gas Division Addition 080.73721 38000 -
080 190 - Mid-Tex Gas Division Addition 080.73728 37602 84
080 190 - Mid-Tex Gas Division Addition 080.73729 37602 4,768
080 190 - Mid-Tex Gas Division Addition 080.73729 38000 2,568
080 190 - Mid-Tex Gas Division Addition 080.73730 37602 7,620
080 190 - Mid-Tex Gas Division Addition 080.73730 38000 953
080 190 - Mid-Tex Gas Division Addition 080.73732 37602 5,763
080 190 - Mid-Tex Gas Division Addition 080.73732 38000 303
080 190 - Mid-Tex Gas Division Addition 080.73733 37602 (22)
080 190 - Mid-Tex Gas Division Addition 080.73735 38000 20,780
080 190 - Mid-Tex Gas Division Addition 080.73735 38500 5,398
080 190 - Mid-Tex Gas Division Addition 080.73736 37602 (3)
080 190 - Mid-Tex Gas Division Addition 080.73739 38000 6,681
080 190 - Mid-Tex Gas Division Addition 080.73739 38100 4,635
080 190 - Mid-Tex Gas Division Addition 080.73741 37602 13,409
080 190 - Mid-Tex Gas Division Addition 080.73745 37602 753,882
080 190 - Mid-Tex Gas Division Addition 080.73745 38000 251,294
080 190 - Mid-Tex Gas Division Addition 080.73748 37602 820,097
080 190 - Mid-Tex Gas Division Addition 080.73749 37602 (17,622)
080 190 - Mid-Tex Gas Division Addition 080.73749 37800 (4,322)
080 190 - Mid-Tex Gas Division Addition 080.73749 38000 (4,821)
080 190 - Mid-Tex Gas Division Addition 080.73750 37602 2,275
080 190 - Mid-Tex Gas Division Addition 080.73751 37602 439,842
080 190 - Mid-Tex Gas Division Addition 080.73753 37602 846,683
MTX Additions by FERC
Page 73 of 101
471
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.73753 38000 149,415
080 190 - Mid-Tex Gas Division Addition 080.73755 37602 380,659
080 190 - Mid-Tex Gas Division Addition 080.73755 38000 133,745
080 190 - Mid-Tex Gas Division Addition 080.73756 37602 10,197
080 190 - Mid-Tex Gas Division Addition 080.73757 37602 (162)
080 190 - Mid-Tex Gas Division Addition 080.73758 37602 2,983
080 190 - Mid-Tex Gas Division Addition 080.73759 37602 14,654
080 190 - Mid-Tex Gas Division Addition 080.73761 37602 522,529
080 190 - Mid-Tex Gas Division Addition 080.73761 38000 27,502
080 190 - Mid-Tex Gas Division Addition 080.73763 37602 (2)
080 190 - Mid-Tex Gas Division Addition 080.73765 37602 16,005
080 190 - Mid-Tex Gas Division Addition 080.73766 37602 18,314
080 190 - Mid-Tex Gas Division Addition 080.73766 38000 -
080 190 - Mid-Tex Gas Division Addition 080.73768 37602 90,363
080 190 - Mid-Tex Gas Division Addition 080.73769 37602 18,709
080 190 - Mid-Tex Gas Division Addition 080.73770 37602 76,099
080 190 - Mid-Tex Gas Division Addition 080.73771 37602 499,108
080 190 - Mid-Tex Gas Division Addition 080.73773 37602 36,094
080 190 - Mid-Tex Gas Division Addition 080.73773 38000 6,621
080 190 - Mid-Tex Gas Division Addition 080.73774 37602 5,999
080 190 - Mid-Tex Gas Division Addition 080.73775 37602 81,496
080 190 - Mid-Tex Gas Division Addition 080.73776 37602 5,670
080 190 - Mid-Tex Gas Division Addition 080.73776 38000 493
080 190 - Mid-Tex Gas Division Addition 080.73777 37602 33,046
080 190 - Mid-Tex Gas Division Addition 080.73784 37602 4,134
080 190 - Mid-Tex Gas Division Addition 080.73784 38000 42
080 190 - Mid-Tex Gas Division Addition 080.73786 37602 630
080 190 - Mid-Tex Gas Division Addition 080.73787 37602 1,550
080 190 - Mid-Tex Gas Division Addition 080.73787 38000 172
080 190 - Mid-Tex Gas Division Addition 080.73793 37602 415,212
080 190 - Mid-Tex Gas Division Addition 080.73793 38000 46,135
080 190 - Mid-Tex Gas Division Addition 080.73797 37602 563
080 190 - Mid-Tex Gas Division Addition 080.73801 37602 360
080 190 - Mid-Tex Gas Division Addition 080.73803 37602 12,136
080 190 - Mid-Tex Gas Division Addition 080.73803 37800 1,348
080 190 - Mid-Tex Gas Division Addition 080.73806 37602 6,753
080 190 - Mid-Tex Gas Division Addition 080.73806 37800 6,753
080 190 - Mid-Tex Gas Division Addition 080.73807 37602 14,309
080 190 - Mid-Tex Gas Division Addition 080.73807 37800 753
080 190 - Mid-Tex Gas Division Addition 080.73809 37602 7,527
080 190 - Mid-Tex Gas Division Addition 080.73809 37800 3,226
080 190 - Mid-Tex Gas Division Addition 080.73810 37602 396,543
080 190 - Mid-Tex Gas Division Addition 080.73810 38000 132,181
080 190 - Mid-Tex Gas Division Addition 080.73814 37602 3,487
080 190 - Mid-Tex Gas Division Addition 080.73817 37602 26,230
080 190 - Mid-Tex Gas Division Addition 080.73817 38000 2,594
080 190 - Mid-Tex Gas Division Addition 080.73818 37601 51,004
080 190 - Mid-Tex Gas Division Addition 080.73818 37602 5,049,442
080 190 - Mid-Tex Gas Division Addition 080.73822 37602 26,685
080 190 - Mid-Tex Gas Division Addition 080.73822 38000 62,265
080 190 - Mid-Tex Gas Division Addition 080.73823 37602 59,070
080 190 - Mid-Tex Gas Division Addition 080.73826 37602 718
080 190 - Mid-Tex Gas Division Addition 080.73828 37602 14,856
080 190 - Mid-Tex Gas Division Addition 080.73829 39000 (267,397)
080 190 - Mid-Tex Gas Division Addition 080.73831 37602 15,727
080 190 - Mid-Tex Gas Division Addition 080.73834 37602 1,140
080 190 - Mid-Tex Gas Division Addition 080.73835 37602 2,673
080 190 - Mid-Tex Gas Division Addition 080.73835 38000 41
080 190 - Mid-Tex Gas Division Addition 080.73836 37602 -
080 190 - Mid-Tex Gas Division Addition 080.73837 37602 48,650
080 190 - Mid-Tex Gas Division Addition 080.73837 38000 8,585
080 190 - Mid-Tex Gas Division Addition 080.73838 37602 52,720
080 190 - Mid-Tex Gas Division Addition 080.73838 38000 7,189
080 190 - Mid-Tex Gas Division Addition 080.73839 37602 473,346
080 190 - Mid-Tex Gas Division Addition 080.73839 38000 52,594
080 190 - Mid-Tex Gas Division Addition 080.73840 37602 464,015
080 190 - Mid-Tex Gas Division Addition 080.73840 38000 29,618
080 190 - Mid-Tex Gas Division Addition 080.73841 37602 489,519
080 190 - Mid-Tex Gas Division Addition 080.73841 38000 54,391
080 190 - Mid-Tex Gas Division Addition 080.73842 37602 232,832
080 190 - Mid-Tex Gas Division Addition 080.73842 38000 12,254
080 190 - Mid-Tex Gas Division Addition 080.73845 37602 170,437
080 190 - Mid-Tex Gas Division Addition 080.73845 38000 18,938
080 190 - Mid-Tex Gas Division Addition 080.73846 37602 357,702
080 190 - Mid-Tex Gas Division Addition 080.73846 38000 89,425
080 190 - Mid-Tex Gas Division Addition 080.73847 37602 261,950
080 190 - Mid-Tex Gas Division Addition 080.73847 38000 29,106
080 190 - Mid-Tex Gas Division Addition 080.73848 37602 221,657
080 190 - Mid-Tex Gas Division Addition 080.73848 38000 147,771
080 190 - Mid-Tex Gas Division Addition 080.73849 37602 276,387
080 190 - Mid-Tex Gas Division Addition 080.73849 38000 30,710
080 190 - Mid-Tex Gas Division Addition 080.73850 37602 3,936
080 190 - Mid-Tex Gas Division Addition 080.73850 37800 5,093
080 190 - Mid-Tex Gas Division Addition 080.73850 38000 232
080 190 - Mid-Tex Gas Division Addition 080.73852 37602 2,865
080 190 - Mid-Tex Gas Division Addition 080.73853 37602 976
080 190 - Mid-Tex Gas Division Addition 080.73855 37602 156,728
080 190 - Mid-Tex Gas Division Addition 080.73856 37602 161,481
080 190 - Mid-Tex Gas Division Addition 080.73857 37602 -
080 190 - Mid-Tex Gas Division Addition 080.73859 37602 216,096
080 190 - Mid-Tex Gas Division Addition 080.73859 38000 126,914
080 190 - Mid-Tex Gas Division Addition 080.73864 37601 478,639
080 190 - Mid-Tex Gas Division Addition 080.73865 37602 435,142
080 190 - Mid-Tex Gas Division Addition 080.73865 38000 95,519
080 190 - Mid-Tex Gas Division Addition 080.73869 37602 13,743
080 190 - Mid-Tex Gas Division Addition 080.73871 37602 1,985
080 190 - Mid-Tex Gas Division Addition 080.73872 37602 39,697
080 190 - Mid-Tex Gas Division Addition 080.73872 37800 59,546
080 190 - Mid-Tex Gas Division Addition 080.73873 39000 -
080 190 - Mid-Tex Gas Division Addition 080.73876 37602 (7,360)
080 190 - Mid-Tex Gas Division Addition 080.73877 38000 2,446
080 190 - Mid-Tex Gas Division Addition 080.73883 37602 187,990
080 190 - Mid-Tex Gas Division Addition 080.73883 38000 80,567
080 190 - Mid-Tex Gas Division Addition 080.73884 37602 5,668
080 190 - Mid-Tex Gas Division Addition 080.73885 37602 37,775
080 190 - Mid-Tex Gas Division Addition 080.73885 38000 4,197
080 190 - Mid-Tex Gas Division Addition 080.73886 38000 41,119
MTX Additions by FERC
Page 74 of 101
472
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.73886 38100 19
080 190 - Mid-Tex Gas Division Addition 080.73886 38500 (4)
080 190 - Mid-Tex Gas Division Addition 080.73887 37602 -
080 190 - Mid-Tex Gas Division Addition 080.73890 37602 3,287
080 190 - Mid-Tex Gas Division Addition 080.73890 38000 365
080 190 - Mid-Tex Gas Division Addition 080.73892 37602 286,080
080 190 - Mid-Tex Gas Division Addition 080.73892 38000 122,606
080 190 - Mid-Tex Gas Division Addition 080.73893 37602 4,320
080 190 - Mid-Tex Gas Division Addition 080.73893 38000 1,440
080 190 - Mid-Tex Gas Division Addition 080.73895 37602 510,975
080 190 - Mid-Tex Gas Division Addition 080.73895 38000 179,532
080 190 - Mid-Tex Gas Division Addition 080.73896 37602 138,343
080 190 - Mid-Tex Gas Division Addition 080.73896 38000 7,281
080 190 - Mid-Tex Gas Division Addition 080.73897 37602 3,392
080 190 - Mid-Tex Gas Division Addition 080.73897 38000 509
080 190 - Mid-Tex Gas Division Addition 080.73900 37602 22,688
080 190 - Mid-Tex Gas Division Addition 080.73900 37800 7,554
080 190 - Mid-Tex Gas Division Addition 080.73900 38000 15,254
080 190 - Mid-Tex Gas Division Addition 080.73900 38100 5,031
080 190 - Mid-Tex Gas Division Addition 080.73903 37602 366,177
080 190 - Mid-Tex Gas Division Addition 080.73903 38000 156,933
080 190 - Mid-Tex Gas Division Addition 080.73908 37602 24,215
080 190 - Mid-Tex Gas Division Addition 080.73908 38000 4,273
080 190 - Mid-Tex Gas Division Addition 080.73914 37602 3,389
080 190 - Mid-Tex Gas Division Addition 080.73914 37800 13,555
080 190 - Mid-Tex Gas Division Addition 080.73915 37602 3
080 190 - Mid-Tex Gas Division Addition 080.73916 37602 1,455
080 190 - Mid-Tex Gas Division Addition 080.73916 38000 162
080 190 - Mid-Tex Gas Division Addition 080.73929 37602 93,805
080 190 - Mid-Tex Gas Division Addition 080.73933 37602 -
080 190 - Mid-Tex Gas Division Addition 080.73934 37602 633,776
080 190 - Mid-Tex Gas Division Addition 080.73938 37602 2,995
080 190 - Mid-Tex Gas Division Addition 080.73938 38000 93
080 190 - Mid-Tex Gas Division Addition 080.73941 37602 380,353
080 190 - Mid-Tex Gas Division Addition 080.73941 38000 204,806
080 190 - Mid-Tex Gas Division Addition 080.73942 37602 432
080 190 - Mid-Tex Gas Division Addition 080.73948 38000 1,654
080 190 - Mid-Tex Gas Division Addition 080.73950 37601 132,106
080 190 - Mid-Tex Gas Division Addition 080.73952 37602 10,609
080 190 - Mid-Tex Gas Division Addition 080.73952 38000 1,179
080 190 - Mid-Tex Gas Division Addition 080.73953 37602 1,320
080 190 - Mid-Tex Gas Division Addition 080.73954 37602 862
080 190 - Mid-Tex Gas Division Addition 080.73955 37602 (35,861)
080 190 - Mid-Tex Gas Division Addition 080.73957 37602 48
080 190 - Mid-Tex Gas Division Addition 080.73959 37602 52,880
080 190 - Mid-Tex Gas Division Addition 080.73959 38000 9,332
080 190 - Mid-Tex Gas Division Addition 080.73965 37602 476,583
080 190 - Mid-Tex Gas Division Addition 080.73965 38000 125,103
080 190 - Mid-Tex Gas Division Addition 080.73967 37602 390,702
080 190 - Mid-Tex Gas Division Addition 080.73969 37602 (38)
080 190 - Mid-Tex Gas Division Addition 080.73971 37602 169
080 190 - Mid-Tex Gas Division Addition 080.73972 37602 320,778
080 190 - Mid-Tex Gas Division Addition 080.73972 38000 56,608
080 190 - Mid-Tex Gas Division Addition 080.73973 37800 10,696
080 190 - Mid-Tex Gas Division Addition 080.73973 38000 60,612
080 190 - Mid-Tex Gas Division Addition 080.73977 37602 23,945
080 190 - Mid-Tex Gas Division Addition 080.73978 37800 76
080 190 - Mid-Tex Gas Division Addition 080.73979 37602 28,791
080 190 - Mid-Tex Gas Division Addition 080.73983 37602 433,632
080 190 - Mid-Tex Gas Division Addition 080.73983 38000 108,408
080 190 - Mid-Tex Gas Division Addition 080.73984 37602 159,725
080 190 - Mid-Tex Gas Division Addition 080.73988 37602 380,414
080 190 - Mid-Tex Gas Division Addition 080.73988 38000 163,035
080 190 - Mid-Tex Gas Division Addition 080.73991 37602 19,675
080 190 - Mid-Tex Gas Division Addition 080.73994 37602 366,784
080 190 - Mid-Tex Gas Division Addition 080.73994 38000 64,727
080 190 - Mid-Tex Gas Division Addition 080.73997 37602 14,170
080 190 - Mid-Tex Gas Division Addition 080.74000 37602 192,565
080 190 - Mid-Tex Gas Division Addition 080.74000 38000 21,396
080 190 - Mid-Tex Gas Division Addition 080.74002 37602 17,177
080 190 - Mid-Tex Gas Division Addition 080.74002 38000 (809)
080 190 - Mid-Tex Gas Division Addition 080.74003 37602 855,508
080 190 - Mid-Tex Gas Division Addition 080.74003 38000 95,057
080 190 - Mid-Tex Gas Division Addition 080.74004 37602 52
080 190 - Mid-Tex Gas Division Addition 080.74005 37602 681
080 190 - Mid-Tex Gas Division Addition 080.74005 38000 36
080 190 - Mid-Tex Gas Division Addition 080.74007 37602 (12)
080 190 - Mid-Tex Gas Division Addition 080.74008 37602 13,798
080 190 - Mid-Tex Gas Division Addition 080.74009 37602 422,080
080 190 - Mid-Tex Gas Division Addition 080.74009 38000 46,898
080 190 - Mid-Tex Gas Division Addition 080.74011 37602 557,771
080 190 - Mid-Tex Gas Division Addition 080.74011 38000 287,336
080 190 - Mid-Tex Gas Division Addition 080.74015 37602 9,652
080 190 - Mid-Tex Gas Division Addition 080.74017 37601 119,716
080 190 - Mid-Tex Gas Division Addition 080.74017 37602 489,854
080 190 - Mid-Tex Gas Division Addition 080.74017 38000 34,370
080 190 - Mid-Tex Gas Division Addition 080.74021 37602 1,214
080 190 - Mid-Tex Gas Division Addition 080.74022 37602 (92,873)
080 190 - Mid-Tex Gas Division Addition 080.74022 38000 (4,882)
080 190 - Mid-Tex Gas Division Addition 080.74027 37602 15,948
080 190 - Mid-Tex Gas Division Addition 080.74027 38000 1,772
080 190 - Mid-Tex Gas Division Addition 080.74028 37602 194,894
080 190 - Mid-Tex Gas Division Addition 080.74028 38000 21,655
080 190 - Mid-Tex Gas Division Addition 080.74031 37602 114,107
080 190 - Mid-Tex Gas Division Addition 080.74031 38000 28,527
080 190 - Mid-Tex Gas Division Addition 080.74032 37602 122,780
080 190 - Mid-Tex Gas Division Addition 080.74032 38000 6,462
080 190 - Mid-Tex Gas Division Addition 080.74038 37602 247,941
080 190 - Mid-Tex Gas Division Addition 080.74038 37800 202,861
080 190 - Mid-Tex Gas Division Addition 080.74039 37602 98,014
080 190 - Mid-Tex Gas Division Addition 080.74039 38000 42,006
080 190 - Mid-Tex Gas Division Addition 080.74040 37602 73,236
080 190 - Mid-Tex Gas Division Addition 080.74040 38000 73,236
080 190 - Mid-Tex Gas Division Addition 080.74041 37602 158,993
080 190 - Mid-Tex Gas Division Addition 080.74041 38000 105,995
080 190 - Mid-Tex Gas Division Addition 080.74042 37602 6,666
080 190 - Mid-Tex Gas Division Addition 080.74046 37602 -
MTX Additions by FERC
Page 75 of 101
473
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.74047 37601 (3,266)
080 190 - Mid-Tex Gas Division Addition 080.74047 37602 (8,166)
080 190 - Mid-Tex Gas Division Addition 080.74047 37800 (4,900)
080 190 - Mid-Tex Gas Division Addition 080.74048 37602 589,782
080 190 - Mid-Tex Gas Division Addition 080.74048 38000 65,531
080 190 - Mid-Tex Gas Division Addition 080.74049 37602 222,342
080 190 - Mid-Tex Gas Division Addition 080.74050 37602 162,742
080 190 - Mid-Tex Gas Division Addition 080.74054 37602 391,354
080 190 - Mid-Tex Gas Division Addition 080.74054 38000 69,062
080 190 - Mid-Tex Gas Division Addition 080.74060 37601 16,961
080 190 - Mid-Tex Gas Division Addition 080.74060 37602 1,212
080 190 - Mid-Tex Gas Division Addition 080.74060 37800 6,058
080 190 - Mid-Tex Gas Division Addition 080.74063 37602 170,289
080 190 - Mid-Tex Gas Division Addition 080.74073 37602 2,384
080 190 - Mid-Tex Gas Division Addition 080.74074 37602 144,737
080 190 - Mid-Tex Gas Division Addition 080.74076 37602 770
080 190 - Mid-Tex Gas Division Addition 080.74078 38000 4,193
080 190 - Mid-Tex Gas Division Addition 080.74079 37602 5,853
080 190 - Mid-Tex Gas Division Addition 080.74079 38000 650
080 190 - Mid-Tex Gas Division Addition 080.74080 37602 -
080 190 - Mid-Tex Gas Division Addition 080.74086 37602 385,668
080 190 - Mid-Tex Gas Division Addition 080.74087 37602 356,536
080 190 - Mid-Tex Gas Division Addition 080.74087 38000 83,632
080 190 - Mid-Tex Gas Division Addition 080.74089 37601 1,097
080 190 - Mid-Tex Gas Division Addition 080.74096 37602 159
080 190 - Mid-Tex Gas Division Addition 080.74098 37602 236,544
080 190 - Mid-Tex Gas Division Addition 080.74098 38000 78,848
080 190 - Mid-Tex Gas Division Addition 080.74100 37602 (40)
080 190 - Mid-Tex Gas Division Addition 080.74101 37602 890
080 190 - Mid-Tex Gas Division Addition 080.74103 37602 6,628
080 190 - Mid-Tex Gas Division Addition 080.74108 37602 80
080 190 - Mid-Tex Gas Division Addition 080.74111 37602 204,558
080 190 - Mid-Tex Gas Division Addition 080.74114 37602 640,579
080 190 - Mid-Tex Gas Division Addition 080.74119 37602 933,607
080 190 - Mid-Tex Gas Division Addition 080.74119 38000 164,754
080 190 - Mid-Tex Gas Division Addition 080.74121 37602 1,008,092
080 190 - Mid-Tex Gas Division Addition 080.74121 38000 474,396
080 190 - Mid-Tex Gas Division Addition 080.74122 37602 37,415
080 190 - Mid-Tex Gas Division Addition 080.74122 38000 5,591
080 190 - Mid-Tex Gas Division Addition 080.74123 38000 17,277
080 190 - Mid-Tex Gas Division Addition 080.74127 37602 172,971
080 190 - Mid-Tex Gas Division Addition 080.74128 37602 109,911
080 190 - Mid-Tex Gas Division Addition 080.74130 37602 1,611
080 190 - Mid-Tex Gas Division Addition 080.74130 38000 179
080 190 - Mid-Tex Gas Division Addition 080.74136 37602 2,869
080 190 - Mid-Tex Gas Division Addition 080.74136 38000 506
080 190 - Mid-Tex Gas Division Addition 080.74137 37602 572,718
080 190 - Mid-Tex Gas Division Addition 080.74137 38000 245,451
080 190 - Mid-Tex Gas Division Addition 080.74140 37602 95,523
080 190 - Mid-Tex Gas Division Addition 080.74140 38000 38,825
080 190 - Mid-Tex Gas Division Addition 080.74144 37602 443,826
080 190 - Mid-Tex Gas Division Addition 080.74147 37602 65,417
080 190 - Mid-Tex Gas Division Addition 080.74149 37602 159,954
080 190 - Mid-Tex Gas Division Addition 080.74150 37602 105,500
080 190 - Mid-Tex Gas Division Addition 080.74155 37602 (36)
080 190 - Mid-Tex Gas Division Addition 080.74158 37602 12,507
080 190 - Mid-Tex Gas Division Addition 080.74159 37602 989,799
080 190 - Mid-Tex Gas Division Addition 080.74159 38000 202,730
080 190 - Mid-Tex Gas Division Addition 080.74160 37602 82,714
080 190 - Mid-Tex Gas Division Addition 080.74161 37602 638
080 190 - Mid-Tex Gas Division Addition 080.74162 37602 2,838
080 190 - Mid-Tex Gas Division Addition 080.74163 37602 535
080 190 - Mid-Tex Gas Division Addition 080.74164 37602 1,431
080 190 - Mid-Tex Gas Division Addition 080.74165 37602 4,016
080 190 - Mid-Tex Gas Division Addition 080.74169 37602 96,409
080 190 - Mid-Tex Gas Division Addition 080.74170 37602 1,837
080 190 - Mid-Tex Gas Division Addition 080.74171 37602 154,975
080 190 - Mid-Tex Gas Division Addition 080.74173 37602 18,707
080 190 - Mid-Tex Gas Division Addition 080.74174 37602 267,118
080 190 - Mid-Tex Gas Division Addition 080.74174 38000 114,479
080 190 - Mid-Tex Gas Division Addition 080.74176 37602 13,278
080 190 - Mid-Tex Gas Division Addition 080.74184 37602 284,482
080 190 - Mid-Tex Gas Division Addition 080.74184 38000 14,973
080 190 - Mid-Tex Gas Division Addition 080.74186 37601 -
080 190 - Mid-Tex Gas Division Addition 080.74186 37602 7,461
080 190 - Mid-Tex Gas Division Addition 080.74188 37602 1,213,695
080 190 - Mid-Tex Gas Division Addition 080.74188 38000 134,855
080 190 - Mid-Tex Gas Division Addition 080.74200 37602 347,928
080 190 - Mid-Tex Gas Division Addition 080.74202 37602 107,389
080 190 - Mid-Tex Gas Division Addition 080.74204 37602 4,207
080 190 - Mid-Tex Gas Division Addition 080.74208 37602 4,587
080 190 - Mid-Tex Gas Division Addition 080.74208 38000 511
080 190 - Mid-Tex Gas Division Addition 080.74210 37602 907
080 190 - Mid-Tex Gas Division Addition 080.74215 37602 49,236
080 190 - Mid-Tex Gas Division Addition 080.74215 38100 447
080 190 - Mid-Tex Gas Division Addition 080.74215 38300 23
080 190 - Mid-Tex Gas Division Addition 080.74216 37602 220,306
080 190 - Mid-Tex Gas Division Addition 080.74217 37602 782
080 190 - Mid-Tex Gas Division Addition 080.74218 37602 7,599
080 190 - Mid-Tex Gas Division Addition 080.74218 38000 400
080 190 - Mid-Tex Gas Division Addition 080.74219 37602 2,363
080 190 - Mid-Tex Gas Division Addition 080.74225 37602 4,902
080 190 - Mid-Tex Gas Division Addition 080.74229 37602 137,503
080 190 - Mid-Tex Gas Division Addition 080.74233 37602 22,843
080 190 - Mid-Tex Gas Division Addition 080.74241 37602 287,112
080 190 - Mid-Tex Gas Division Addition 080.74242 37602 344,997
080 190 - Mid-Tex Gas Division Addition 080.74249 37602 214,081
080 190 - Mid-Tex Gas Division Addition 080.74250 37602 629,602
080 190 - Mid-Tex Gas Division Addition 080.74254 37602 239,465
080 190 - Mid-Tex Gas Division Addition 080.74257 37602 475,128
080 190 - Mid-Tex Gas Division Addition 080.74257 38000 52,792
080 190 - Mid-Tex Gas Division Addition 080.74258 37602 47,454
080 190 - Mid-Tex Gas Division Addition 080.74259 37602 97,951
080 190 - Mid-Tex Gas Division Addition 080.74259 37800 26,120
080 190 - Mid-Tex Gas Division Addition 080.74259 38000 6,530
080 190 - Mid-Tex Gas Division Addition 080.74260 37602 585,152
080 190 - Mid-Tex Gas Division Addition 080.74260 38000 65,017
MTX Additions by FERC
Page 76 of 101
474
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.74261 37800 637
080 190 - Mid-Tex Gas Division Addition 080.74264 37602 191,525
080 190 - Mid-Tex Gas Division Addition 080.74266 37602 316,381
080 190 - Mid-Tex Gas Division Addition 080.74266 38000 43,143
080 190 - Mid-Tex Gas Division Addition 080.74272 37602 2,075
080 190 - Mid-Tex Gas Division Addition 080.74273 37602 84,798
080 190 - Mid-Tex Gas Division Addition 080.74278 37602 3,373,268
080 190 - Mid-Tex Gas Division Addition 080.74281 37602 2,712
080 190 - Mid-Tex Gas Division Addition 080.74281 38000 143
080 190 - Mid-Tex Gas Division Addition 080.74283 37800 189,080
080 190 - Mid-Tex Gas Division Addition 080.74285 37601 (0)
080 190 - Mid-Tex Gas Division Addition 080.74285 37602 91,789
080 190 - Mid-Tex Gas Division Addition 080.74287 37602 91,560
080 190 - Mid-Tex Gas Division Addition 080.74288 37602 53,831
080 190 - Mid-Tex Gas Division Addition 080.74290 37602 17,491
080 190 - Mid-Tex Gas Division Addition 080.74295 37602 1,000,328
080 190 - Mid-Tex Gas Division Addition 080.74299 37602 1,031,978
080 190 - Mid-Tex Gas Division Addition 080.74299 38000 257,995
080 190 - Mid-Tex Gas Division Addition 080.74305 37602 334,492
080 190 - Mid-Tex Gas Division Addition 080.74305 38000 59,028
080 190 - Mid-Tex Gas Division Addition 080.74308 37602 2,492
080 190 - Mid-Tex Gas Division Addition 080.74308 37800 1,150
080 190 - Mid-Tex Gas Division Addition 080.74308 38000 192
080 190 - Mid-Tex Gas Division Addition 080.74309 37602 4,382
080 190 - Mid-Tex Gas Division Addition 080.74309 37800 2,921
080 190 - Mid-Tex Gas Division Addition 080.74310 37602 344
080 190 - Mid-Tex Gas Division Addition 080.74310 37800 310
080 190 - Mid-Tex Gas Division Addition 080.74310 38000 34
080 190 - Mid-Tex Gas Division Addition 080.74311 37602 3,453
080 190 - Mid-Tex Gas Division Addition 080.74311 37800 5,179
080 190 - Mid-Tex Gas Division Addition 080.74312 37602 1,578
080 190 - Mid-Tex Gas Division Addition 080.74312 37800 1,291
080 190 - Mid-Tex Gas Division Addition 080.74313 37602 450,112
080 190 - Mid-Tex Gas Division Addition 080.74313 38000 450,112
080 190 - Mid-Tex Gas Division Addition 080.74315 37602 7,237
080 190 - Mid-Tex Gas Division Addition 080.74315 37800 224
080 190 - Mid-Tex Gas Division Addition 080.74318 37602 6,166
080 190 - Mid-Tex Gas Division Addition 080.74318 37800 9,250
080 190 - Mid-Tex Gas Division Addition 080.74320 37602 38,387
080 190 - Mid-Tex Gas Division Addition 080.74320 37800 52,783
080 190 - Mid-Tex Gas Division Addition 080.74320 38000 4,798
080 190 - Mid-Tex Gas Division Addition 080.74321 37602 551,675
080 190 - Mid-Tex Gas Division Addition 080.74326 37602 177,093
080 190 - Mid-Tex Gas Division Addition 080.74328 37602 1,540
080 190 - Mid-Tex Gas Division Addition 080.74335 37602 353,948
080 190 - Mid-Tex Gas Division Addition 080.74335 38000 52,889
080 190 - Mid-Tex Gas Division Addition 080.74339 37602 66
080 190 - Mid-Tex Gas Division Addition 080.74340 37602 13,247
080 190 - Mid-Tex Gas Division Addition 080.74340 38000 2,338
080 190 - Mid-Tex Gas Division Addition 080.74341 37602 263,093
080 190 - Mid-Tex Gas Division Addition 080.74341 38000 83,082
080 190 - Mid-Tex Gas Division Addition 080.74343 37602 431,929
080 190 - Mid-Tex Gas Division Addition 080.74343 38000 143,976
080 190 - Mid-Tex Gas Division Addition 080.74344 37602 522,167
080 190 - Mid-Tex Gas Division Addition 080.74344 38000 130,542
080 190 - Mid-Tex Gas Division Addition 080.74345 37602 503,087
080 190 - Mid-Tex Gas Division Addition 080.74345 38000 167,696
080 190 - Mid-Tex Gas Division Addition 080.74346 37602 358,645
080 190 - Mid-Tex Gas Division Addition 080.74346 38000 219,815
080 190 - Mid-Tex Gas Division Addition 080.74347 37602 300,862
080 190 - Mid-Tex Gas Division Addition 080.74347 38000 297,868
080 190 - Mid-Tex Gas Division Addition 080.74348 37602 327,584
080 190 - Mid-Tex Gas Division Addition 080.74348 38000 140,393
080 190 - Mid-Tex Gas Division Addition 080.74349 37602 457,130
080 190 - Mid-Tex Gas Division Addition 080.74349 38000 304,753
080 190 - Mid-Tex Gas Division Addition 080.74353 37602 800,583
080 190 - Mid-Tex Gas Division Addition 080.74353 38000 200,146
080 190 - Mid-Tex Gas Division Addition 080.74356 37602 851,328
080 190 - Mid-Tex Gas Division Addition 080.74356 38000 212,832
080 190 - Mid-Tex Gas Division Addition 080.74362 37602 8,764
080 190 - Mid-Tex Gas Division Addition 080.74362 38000 974
080 190 - Mid-Tex Gas Division Addition 080.74363 38000 20,764
080 190 - Mid-Tex Gas Division Addition 080.74363 38500 42,148
080 190 - Mid-Tex Gas Division Addition 080.74367 37602 -
080 190 - Mid-Tex Gas Division Addition 080.74372 37602 210,486
080 190 - Mid-Tex Gas Division Addition 080.74373 37602 152
080 190 - Mid-Tex Gas Division Addition 080.74379 37602 14,527
080 190 - Mid-Tex Gas Division Addition 080.74379 38000 1,614
080 190 - Mid-Tex Gas Division Addition 080.74382 37602 (437,509)
080 190 - Mid-Tex Gas Division Addition 080.74382 38000 (13,531)
080 190 - Mid-Tex Gas Division Addition 080.74386 37602 274,770
080 190 - Mid-Tex Gas Division Addition 080.74386 37800 60,611
080 190 - Mid-Tex Gas Division Addition 080.74386 38000 68,692
080 190 - Mid-Tex Gas Division Addition 080.74388 37602 9,502
080 190 - Mid-Tex Gas Division Addition 080.74390 37602 9,435
080 190 - Mid-Tex Gas Division Addition 080.74394 37602 1,413
080 190 - Mid-Tex Gas Division Addition 080.74397 37602 1,328
080 190 - Mid-Tex Gas Division Addition 080.74398 37602 6,323
080 190 - Mid-Tex Gas Division Addition 080.74402 37602 354,638
080 190 - Mid-Tex Gas Division Addition 080.74402 38000 39,404
080 190 - Mid-Tex Gas Division Addition 080.74404 37602 219,869
080 190 - Mid-Tex Gas Division Addition 080.74404 38000 62,014
080 190 - Mid-Tex Gas Division Addition 080.74408 37602 124,334
080 190 - Mid-Tex Gas Division Addition 080.74408 38000 31,083
080 190 - Mid-Tex Gas Division Addition 080.74409 37602 57,338
080 190 - Mid-Tex Gas Division Addition 080.74409 38000 38,225
080 190 - Mid-Tex Gas Division Addition 080.74410 37602 569,454
080 190 - Mid-Tex Gas Division Addition 080.74410 38000 306,629
080 190 - Mid-Tex Gas Division Addition 080.74412 37602 107
080 190 - Mid-Tex Gas Division Addition 080.74415 37602 684,079
080 190 - Mid-Tex Gas Division Addition 080.74415 38000 336,934
080 190 - Mid-Tex Gas Division Addition 080.74416 37602 400,539
080 190 - Mid-Tex Gas Division Addition 080.74416 38000 267,026
080 190 - Mid-Tex Gas Division Addition 080.74417 37602 429,580
080 190 - Mid-Tex Gas Division Addition 080.74417 38000 286,387
080 190 - Mid-Tex Gas Division Addition 080.74418 37602 426,257
080 190 - Mid-Tex Gas Division Addition 080.74418 38000 426,257
MTX Additions by FERC
Page 77 of 101
475
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.74419 37602 494,728
080 190 - Mid-Tex Gas Division Addition 080.74419 38000 329,818
080 190 - Mid-Tex Gas Division Addition 080.74421 37602 478,956
080 190 - Mid-Tex Gas Division Addition 080.74421 38000 391,873
080 190 - Mid-Tex Gas Division Addition 080.74422 37602 903,371
080 190 - Mid-Tex Gas Division Addition 080.74422 38000 18,436
080 190 - Mid-Tex Gas Division Addition 080.74424 37602 741,684
080 190 - Mid-Tex Gas Division Addition 080.74424 38000 39,036
080 190 - Mid-Tex Gas Division Addition 080.74425 37602 338,903
080 190 - Mid-Tex Gas Division Addition 080.74425 38000 338,903
080 190 - Mid-Tex Gas Division Addition 080.74426 37602 4,563
080 190 - Mid-Tex Gas Division Addition 080.74426 38000 4,563
080 190 - Mid-Tex Gas Division Addition 080.74428 37601 -
080 190 - Mid-Tex Gas Division Addition 080.74430 37602 205,621
080 190 - Mid-Tex Gas Division Addition 080.74430 38000 15,477
080 190 - Mid-Tex Gas Division Addition 080.74433 37602 1,198,543
080 190 - Mid-Tex Gas Division Addition 080.74433 38000 133,171
080 190 - Mid-Tex Gas Division Addition 080.74434 37800 0
080 190 - Mid-Tex Gas Division Addition 080.74435 37602 19,658
080 190 - Mid-Tex Gas Division Addition 080.74435 38000 10,585
080 190 - Mid-Tex Gas Division Addition 080.74438 37602 966
080 190 - Mid-Tex Gas Division Addition 080.74439 37602 312,314
080 190 - Mid-Tex Gas Division Addition 080.74439 38000 245,390
080 190 - Mid-Tex Gas Division Addition 080.74440 37602 427,972
080 190 - Mid-Tex Gas Division Addition 080.74440 38000 183,417
080 190 - Mid-Tex Gas Division Addition 080.74441 37602 352,731
080 190 - Mid-Tex Gas Division Addition 080.74441 38000 151,170
080 190 - Mid-Tex Gas Division Addition 080.74442 37602 672,925
080 190 - Mid-Tex Gas Division Addition 080.74442 38000 168,231
080 190 - Mid-Tex Gas Division Addition 080.74443 37602 367,948
080 190 - Mid-Tex Gas Division Addition 080.74443 38000 91,987
080 190 - Mid-Tex Gas Division Addition 080.74447 37602 8,329
080 190 - Mid-Tex Gas Division Addition 080.74450 37602 1,971
080 190 - Mid-Tex Gas Division Addition 080.74450 38000 493
080 190 - Mid-Tex Gas Division Addition 080.74452 37602 (33)
080 190 - Mid-Tex Gas Division Addition 080.74454 37602 350,086
080 190 - Mid-Tex Gas Division Addition 080.74454 38000 286,434
080 190 - Mid-Tex Gas Division Addition 080.74457 37602 2,314
080 190 - Mid-Tex Gas Division Addition 080.74457 38000 408
080 190 - Mid-Tex Gas Division Addition 080.74458 37602 225,802
080 190 - Mid-Tex Gas Division Addition 080.74458 38000 75,267
080 190 - Mid-Tex Gas Division Addition 080.74459 37601 230
080 190 - Mid-Tex Gas Division Addition 080.74459 37602 720
080 190 - Mid-Tex Gas Division Addition 080.74459 37800 489
080 190 - Mid-Tex Gas Division Addition 080.74461 37602 151,474
080 190 - Mid-Tex Gas Division Addition 080.74466 37602 1,568,754
080 190 - Mid-Tex Gas Division Addition 080.74466 38000 276,839
080 190 - Mid-Tex Gas Division Addition 080.74471 37602 1,364,246
080 190 - Mid-Tex Gas Division Addition 080.74471 38000 240,749
080 190 - Mid-Tex Gas Division Addition 080.74474 37602 -
080 190 - Mid-Tex Gas Division Addition 080.74475 37602 335,079
080 190 - Mid-Tex Gas Division Addition 080.74475 38000 37,231
080 190 - Mid-Tex Gas Division Addition 080.74477 37602 70,029
080 190 - Mid-Tex Gas Division Addition 080.74477 38000 3,686
080 190 - Mid-Tex Gas Division Addition 080.74484 37602 5,531
080 190 - Mid-Tex Gas Division Addition 080.74485 37602 524
080 190 - Mid-Tex Gas Division Addition 080.74486 37602 160
080 190 - Mid-Tex Gas Division Addition 080.74488 37602 7,327
080 190 - Mid-Tex Gas Division Addition 080.74490 37602 274,263
080 190 - Mid-Tex Gas Division Addition 080.74490 38000 68,566
080 190 - Mid-Tex Gas Division Addition 080.74491 37602 2,539
080 190 - Mid-Tex Gas Division Addition 080.74492 37602 163,808
080 190 - Mid-Tex Gas Division Addition 080.74493 37602 181,573
080 190 - Mid-Tex Gas Division Addition 080.74496 37602 11,413
080 190 - Mid-Tex Gas Division Addition 080.74499 37602 412,173
080 190 - Mid-Tex Gas Division Addition 080.74501 37602 39,792
080 190 - Mid-Tex Gas Division Addition 080.74501 38000 4,421
080 190 - Mid-Tex Gas Division Addition 080.74505 37602 35,619
080 190 - Mid-Tex Gas Division Addition 080.74508 37601 -
080 190 - Mid-Tex Gas Division Addition 080.74508 37602 46,852
080 190 - Mid-Tex Gas Division Addition 080.74509 37600 -
080 190 - Mid-Tex Gas Division Addition 080.74509 37602 50,617
080 190 - Mid-Tex Gas Division Addition 080.74510 37602 1,445
080 190 - Mid-Tex Gas Division Addition 080.74511 37602 381,292
080 190 - Mid-Tex Gas Division Addition 080.74511 38000 179,431
080 190 - Mid-Tex Gas Division Addition 080.74514 37602 417,485
080 190 - Mid-Tex Gas Division Addition 080.74514 38000 215,068
080 190 - Mid-Tex Gas Division Addition 080.74515 37602 574,201
080 190 - Mid-Tex Gas Division Addition 080.74515 38000 257,974
080 190 - Mid-Tex Gas Division Addition 080.74532 37602 391,903
080 190 - Mid-Tex Gas Division Addition 080.74532 38000 391,903
080 190 - Mid-Tex Gas Division Addition 080.74533 37602 93,883
080 190 - Mid-Tex Gas Division Addition 080.74534 37602 157,165
080 190 - Mid-Tex Gas Division Addition 080.74539 37601 1,516,062
080 190 - Mid-Tex Gas Division Addition 080.74539 37602 114,112
080 190 - Mid-Tex Gas Division Addition 080.74540 37602 (468)
080 190 - Mid-Tex Gas Division Addition 080.74543 37602 61,842
080 190 - Mid-Tex Gas Division Addition 080.74544 37602 45,348
080 190 - Mid-Tex Gas Division Addition 080.74545 37602 722,522
080 190 - Mid-Tex Gas Division Addition 080.74545 38000 180,630
080 190 - Mid-Tex Gas Division Addition 080.74553 37601 (4,725)
080 190 - Mid-Tex Gas Division Addition 080.74554 37602 20,352
080 190 - Mid-Tex Gas Division Addition 080.74556 37602 149,866
080 190 - Mid-Tex Gas Division Addition 080.74556 38000 (29,921)
080 190 - Mid-Tex Gas Division Addition 080.74559 37602 50,798
080 190 - Mid-Tex Gas Division Addition 080.74559 38000 16,933
080 190 - Mid-Tex Gas Division Addition 080.74565 37602 486,455
080 190 - Mid-Tex Gas Division Addition 080.74565 38000 25,603
080 190 - Mid-Tex Gas Division Addition 080.74568 37602 641,371
080 190 - Mid-Tex Gas Division Addition 080.74568 38000 213,790
080 190 - Mid-Tex Gas Division Addition 080.74571 37602 104,293
080 190 - Mid-Tex Gas Division Addition 080.74571 37800 44,697
080 190 - Mid-Tex Gas Division Addition 080.74572 37602 88,053
080 190 - Mid-Tex Gas Division Addition 080.74572 37800 31,448
080 190 - Mid-Tex Gas Division Addition 080.74572 38000 6,290
080 190 - Mid-Tex Gas Division Addition 080.74573 37602 74,372
080 190 - Mid-Tex Gas Division Addition 080.74574 37602 201,095
MTX Additions by FERC
Page 78 of 101
476
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.74575 37602 170,967
080 190 - Mid-Tex Gas Division Addition 080.74575 38000 5,288
080 190 - Mid-Tex Gas Division Addition 080.74578 37602 3
080 190 - Mid-Tex Gas Division Addition 080.74580 37602 1,574
080 190 - Mid-Tex Gas Division Addition 080.74580 37800 2,360
080 190 - Mid-Tex Gas Division Addition 080.74582 37602 53,484
080 190 - Mid-Tex Gas Division Addition 080.74582 37800 80,226
080 190 - Mid-Tex Gas Division Addition 080.74583 37602 65,340
080 190 - Mid-Tex Gas Division Addition 080.74583 37800 28,003
080 190 - Mid-Tex Gas Division Addition 080.74586 37602 36,631
080 190 - Mid-Tex Gas Division Addition 080.74586 37800 54,947
080 190 - Mid-Tex Gas Division Addition 080.74589 37602 237,408
080 190 - Mid-Tex Gas Division Addition 080.74589 38000 26,379
080 190 - Mid-Tex Gas Division Addition 080.74591 37602 62,825
080 190 - Mid-Tex Gas Division Addition 080.74591 37800 86,384
080 190 - Mid-Tex Gas Division Addition 080.74591 38000 7,853
080 190 - Mid-Tex Gas Division Addition 080.74592 37602 157,655
080 190 - Mid-Tex Gas Division Addition 080.74592 37800 31,531
080 190 - Mid-Tex Gas Division Addition 080.74592 38000 21,021
080 190 - Mid-Tex Gas Division Addition 080.74593 37602 310,866
080 190 - Mid-Tex Gas Division Addition 080.74595 37602 169,449
080 190 - Mid-Tex Gas Division Addition 080.74597 39004 -
080 190 - Mid-Tex Gas Division Addition 080.74599 37602 128,388
080 190 - Mid-Tex Gas Division Addition 080.74599 37800 64,194
080 190 - Mid-Tex Gas Division Addition 080.74599 38000 21,398
080 190 - Mid-Tex Gas Division Addition 080.74600 37602 671
080 190 - Mid-Tex Gas Division Addition 080.74601 37602 4,366
080 190 - Mid-Tex Gas Division Addition 080.74601 38000 4,366
080 190 - Mid-Tex Gas Division Addition 080.74603 37602 60,510
080 190 - Mid-Tex Gas Division Addition 080.74603 37800 90,765
080 190 - Mid-Tex Gas Division Addition 080.74604 37602 58,168
080 190 - Mid-Tex Gas Division Addition 080.74604 37800 87,252
080 190 - Mid-Tex Gas Division Addition 080.74605 37602 539
080 190 - Mid-Tex Gas Division Addition 080.74606 37602 88,002
080 190 - Mid-Tex Gas Division Addition 080.74606 37800 31,429
080 190 - Mid-Tex Gas Division Addition 080.74606 38000 6,286
080 190 - Mid-Tex Gas Division Addition 080.74609 37602 153,912
080 190 - Mid-Tex Gas Division Addition 080.74609 37800 138,521
080 190 - Mid-Tex Gas Division Addition 080.74609 38000 15,391
080 190 - Mid-Tex Gas Division Addition 080.74610 37602 14,393
080 190 - Mid-Tex Gas Division Addition 080.74610 37800 57,571
080 190 - Mid-Tex Gas Division Addition 080.74615 37602 47,633
080 190 - Mid-Tex Gas Division Addition 080.74615 38000 5,104
080 190 - Mid-Tex Gas Division Addition 080.74617 37602 197,943
080 190 - Mid-Tex Gas Division Addition 080.74617 38000 17,212
080 190 - Mid-Tex Gas Division Addition 080.74619 37602 864
080 190 - Mid-Tex Gas Division Addition 080.74623 37602 373,396
080 190 - Mid-Tex Gas Division Addition 080.74623 38000 160,027
080 190 - Mid-Tex Gas Division Addition 080.74625 37602 304,125
080 190 - Mid-Tex Gas Division Addition 080.74625 38000 33,792
080 190 - Mid-Tex Gas Division Addition 080.74629 37602 5,651
080 190 - Mid-Tex Gas Division Addition 080.74630 37602 61,034
080 190 - Mid-Tex Gas Division Addition 080.74631 38000 143,530
080 190 - Mid-Tex Gas Division Addition 080.74633 37602 155,144
080 190 - Mid-Tex Gas Division Addition 080.74636 37602 127,606
080 190 - Mid-Tex Gas Division Addition 080.74636 38000 42,535
080 190 - Mid-Tex Gas Division Addition 080.74642 37602 784,323
080 190 - Mid-Tex Gas Division Addition 080.74642 38000 183,977
080 190 - Mid-Tex Gas Division Addition 080.74643 37602 111,140
080 190 - Mid-Tex Gas Division Addition 080.74643 38000 7,094
080 190 - Mid-Tex Gas Division Addition 080.74644 37602 194,226
080 190 - Mid-Tex Gas Division Addition 080.74645 37602 1,956,914
080 190 - Mid-Tex Gas Division Addition 080.74645 38000 262
080 190 - Mid-Tex Gas Division Addition 080.74647 37602 434,381
080 190 - Mid-Tex Gas Division Addition 080.74647 38000 186,163
080 190 - Mid-Tex Gas Division Addition 080.74648 37602 593,081
080 190 - Mid-Tex Gas Division Addition 080.74648 38000 104,661
080 190 - Mid-Tex Gas Division Addition 080.74649 37602 536
080 190 - Mid-Tex Gas Division Addition 080.74650 37602 1,192,313
080 190 - Mid-Tex Gas Division Addition 080.74650 38000 298,078
080 190 - Mid-Tex Gas Division Addition 080.74653 37602 4,529
080 190 - Mid-Tex Gas Division Addition 080.74655 37601 5,793,395
080 190 - Mid-Tex Gas Division Addition 080.74655 37602 128,742
080 190 - Mid-Tex Gas Division Addition 080.74655 37800 514,968
080 190 - Mid-Tex Gas Division Addition 080.74657 37602 193,172
080 190 - Mid-Tex Gas Division Addition 080.74657 38000 64,391
080 190 - Mid-Tex Gas Division Addition 080.74660 37602 29,144
080 190 - Mid-Tex Gas Division Addition 080.74660 38000 29
080 190 - Mid-Tex Gas Division Addition 080.74662 37602 3,497
080 190 - Mid-Tex Gas Division Addition 080.74663 37602 401,996
080 190 - Mid-Tex Gas Division Addition 080.74663 38000 80,399
080 190 - Mid-Tex Gas Division Addition 080.74664 37602 338,810
080 190 - Mid-Tex Gas Division Addition 080.74664 38000 338,810
080 190 - Mid-Tex Gas Division Addition 080.74665 37602 674,975
080 190 - Mid-Tex Gas Division Addition 080.74665 38000 134,995
080 190 - Mid-Tex Gas Division Addition 080.74666 37602 691,115
080 190 - Mid-Tex Gas Division Addition 080.74666 38000 460,743
080 190 - Mid-Tex Gas Division Addition 080.74667 37602 41,301
080 190 - Mid-Tex Gas Division Addition 080.74668 37601 98,395
080 190 - Mid-Tex Gas Division Addition 080.74669 37602 209,968
080 190 - Mid-Tex Gas Division Addition 080.74669 38000 25,951
080 190 - Mid-Tex Gas Division Addition 080.74671 37602 325,605
080 190 - Mid-Tex Gas Division Addition 080.74671 38000 81,401
080 190 - Mid-Tex Gas Division Addition 080.74672 37602 337,177
080 190 - Mid-Tex Gas Division Addition 080.74672 38000 84,294
080 190 - Mid-Tex Gas Division Addition 080.74673 37602 302,208
080 190 - Mid-Tex Gas Division Addition 080.74673 38000 117,525
080 190 - Mid-Tex Gas Division Addition 080.74674 37602 251,082
080 190 - Mid-Tex Gas Division Addition 080.74674 38000 62,771
080 190 - Mid-Tex Gas Division Addition 080.74675 37602 309,444
080 190 - Mid-Tex Gas Division Addition 080.74675 38000 77,361
080 190 - Mid-Tex Gas Division Addition 080.74676 37602 417,982
080 190 - Mid-Tex Gas Division Addition 080.74676 38000 139,327
080 190 - Mid-Tex Gas Division Addition 080.74677 37602 454,207
080 190 - Mid-Tex Gas Division Addition 080.74677 38000 113,552
080 190 - Mid-Tex Gas Division Addition 080.74678 37602 317,194
080 190 - Mid-Tex Gas Division Addition 080.74678 38000 105,731
MTX Additions by FERC
Page 79 of 101
477
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.74679 37602 332,864
080 190 - Mid-Tex Gas Division Addition 080.74679 38000 68,177
080 190 - Mid-Tex Gas Division Addition 080.74680 37602 436,404
080 190 - Mid-Tex Gas Division Addition 080.74680 38000 95,796
080 190 - Mid-Tex Gas Division Addition 080.74681 37602 385,721
080 190 - Mid-Tex Gas Division Addition 080.74681 38000 96,430
080 190 - Mid-Tex Gas Division Addition 080.74682 37602 246,885
080 190 - Mid-Tex Gas Division Addition 080.74682 38000 61,721
080 190 - Mid-Tex Gas Division Addition 080.74684 37602 800,245
080 190 - Mid-Tex Gas Division Addition 080.74684 38000 533,497
080 190 - Mid-Tex Gas Division Addition 080.74685 37602 17,438
080 190 - Mid-Tex Gas Division Addition 080.74685 38000 4,431
080 190 - Mid-Tex Gas Division Addition 080.74686 37602 25,112
080 190 - Mid-Tex Gas Division Addition 080.74688 37602 109
080 190 - Mid-Tex Gas Division Addition 080.74691 37602 76,688
080 190 - Mid-Tex Gas Division Addition 080.74692 37602 154,215
080 190 - Mid-Tex Gas Division Addition 080.74693 37602 260,386
080 190 - Mid-Tex Gas Division Addition 080.74693 38000 28,932
080 190 - Mid-Tex Gas Division Addition 080.74694 38000 4,995
080 190 - Mid-Tex Gas Division Addition 080.74695 37602 148,814
080 190 - Mid-Tex Gas Division Addition 080.74696 37602 198,386
080 190 - Mid-Tex Gas Division Addition 080.74701 37602 160
080 190 - Mid-Tex Gas Division Addition 080.74702 37602 412,436
080 190 - Mid-Tex Gas Division Addition 080.74703 37602 838,212
080 190 - Mid-Tex Gas Division Addition 080.74703 38000 93,135
080 190 - Mid-Tex Gas Division Addition 080.74704 37602 40,288
080 190 - Mid-Tex Gas Division Addition 080.74704 37800 60,432
080 190 - Mid-Tex Gas Division Addition 080.74705 37602 60,237
080 190 - Mid-Tex Gas Division Addition 080.74705 37800 40,131
080 190 - Mid-Tex Gas Division Addition 080.74706 37602 95,895
080 190 - Mid-Tex Gas Division Addition 080.74706 37800 63,930
080 190 - Mid-Tex Gas Division Addition 080.74708 37602 15,438
080 190 - Mid-Tex Gas Division Addition 080.74709 37602 419,766
080 190 - Mid-Tex Gas Division Addition 080.74709 38000 139,922
080 190 - Mid-Tex Gas Division Addition 080.74710 37602 6,499
080 190 - Mid-Tex Gas Division Addition 080.74711 37602 227,009
080 190 - Mid-Tex Gas Division Addition 080.74712 37602 1,680
080 190 - Mid-Tex Gas Division Addition 080.74719 37601 54,078
080 190 - Mid-Tex Gas Division Addition 080.74719 37602 144,207
080 190 - Mid-Tex Gas Division Addition 080.74719 37800 125,197
080 190 - Mid-Tex Gas Division Addition 080.74719 38000 36,052
080 190 - Mid-Tex Gas Division Addition 080.74722 37602 7,362
080 190 - Mid-Tex Gas Division Addition 080.74726 37602 1,177
080 190 - Mid-Tex Gas Division Addition 080.74728 37602 210,634
080 190 - Mid-Tex Gas Division Addition 080.74729 37602 280,486
080 190 - Mid-Tex Gas Division Addition 080.74730 37602 133,473
080 190 - Mid-Tex Gas Division Addition 080.74732 37602 71
080 190 - Mid-Tex Gas Division Addition 080.74734 37602 12,340
080 190 - Mid-Tex Gas Division Addition 080.74739 37602 380,597
080 190 - Mid-Tex Gas Division Addition 080.74739 38000 126,866
080 190 - Mid-Tex Gas Division Addition 080.74746 37602 (40,946)
080 190 - Mid-Tex Gas Division Addition 080.74746 38100 (1,558)
080 190 - Mid-Tex Gas Division Addition 080.74747 37602 219,476
080 190 - Mid-Tex Gas Division Addition 080.74747 38000 146,317
080 190 - Mid-Tex Gas Division Addition 080.74749 37602 45,306
080 190 - Mid-Tex Gas Division Addition 080.74750 38100 46,243
080 190 - Mid-Tex Gas Division Addition 080.74751 37602 199,952
080 190 - Mid-Tex Gas Division Addition 080.74752 37602 15,997
080 190 - Mid-Tex Gas Division Addition 080.74752 38000 1,777
080 190 - Mid-Tex Gas Division Addition 080.74753 37602 531,848
080 190 - Mid-Tex Gas Division Addition 080.74753 38000 59,094
080 190 - Mid-Tex Gas Division Addition 080.74755 37602 812
080 190 - Mid-Tex Gas Division Addition 080.74755 37900 2,436
080 190 - Mid-Tex Gas Division Addition 080.74756 37602 32,592
080 190 - Mid-Tex Gas Division Addition 080.74756 37800 97,776
080 190 - Mid-Tex Gas Division Addition 080.74757 37602 377,239
080 190 - Mid-Tex Gas Division Addition 080.74757 38000 66,572
080 190 - Mid-Tex Gas Division Addition 080.74759 37602 157,013
080 190 - Mid-Tex Gas Division Addition 080.74759 38000 157,013
080 190 - Mid-Tex Gas Division Addition 080.74762 38000 (629)
080 190 - Mid-Tex Gas Division Addition 080.74765 38000 7,073
080 190 - Mid-Tex Gas Division Addition 080.74768 37602 361,130
080 190 - Mid-Tex Gas Division Addition 080.74769 37602 215,507
080 190 - Mid-Tex Gas Division Addition 080.74771 37602 1,605
080 190 - Mid-Tex Gas Division Addition 080.74772 37602 1,320,158
080 190 - Mid-Tex Gas Division Addition 080.74773 37601 494,939
080 190 - Mid-Tex Gas Division Addition 080.74773 37800 1,089,374
080 190 - Mid-Tex Gas Division Addition 080.74775 37602 23,649
080 190 - Mid-Tex Gas Division Addition 080.74775 37800 63,941
080 190 - Mid-Tex Gas Division Addition 080.74776 37601 10,434
080 190 - Mid-Tex Gas Division Addition 080.74776 37602 4,869
080 190 - Mid-Tex Gas Division Addition 080.74776 37800 54,256
080 190 - Mid-Tex Gas Division Addition 080.74778 38000 28,165
080 190 - Mid-Tex Gas Division Addition 080.74779 37602 5,048
080 190 - Mid-Tex Gas Division Addition 080.74779 38000 707
080 190 - Mid-Tex Gas Division Addition 080.74780 37602 38,940
080 190 - Mid-Tex Gas Division Addition 080.74780 37800 58,411
080 190 - Mid-Tex Gas Division Addition 080.74782 37602 351,309
080 190 - Mid-Tex Gas Division Addition 080.74782 38000 351,309
080 190 - Mid-Tex Gas Division Addition 080.74783 37602 32,272
080 190 - Mid-Tex Gas Division Addition 080.74783 37800 59,934
080 190 - Mid-Tex Gas Division Addition 080.74785 37602 253
080 190 - Mid-Tex Gas Division Addition 080.74786 37602 114,743
080 190 - Mid-Tex Gas Division Addition 080.74786 38000 (111,294)
080 190 - Mid-Tex Gas Division Addition 080.74787 37602 20,046
080 190 - Mid-Tex Gas Division Addition 080.74791 37602 1,537
080 190 - Mid-Tex Gas Division Addition 080.74794 37602 486,802
080 190 - Mid-Tex Gas Division Addition 080.74794 38000 486,802
080 190 - Mid-Tex Gas Division Addition 080.74798 37602 4,240
080 190 - Mid-Tex Gas Division Addition 080.74799 37602 411,319
080 190 - Mid-Tex Gas Division Addition 080.74799 38000 274,212
080 190 - Mid-Tex Gas Division Addition 080.74805 37602 44,213
080 190 - Mid-Tex Gas Division Addition 080.74805 38000 2,327
080 190 - Mid-Tex Gas Division Addition 080.74806 39400 84,505
080 190 - Mid-Tex Gas Division Addition 080.74807 37602 13,499
080 190 - Mid-Tex Gas Division Addition 080.74808 37602 92,288
080 190 - Mid-Tex Gas Division Addition 080.74808 38000 4,857
MTX Additions by FERC
Page 80 of 101
478
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.74809 37602 143,174
080 190 - Mid-Tex Gas Division Addition 080.74809 38000 14,160
080 190 - Mid-Tex Gas Division Addition 080.74810 37602 341,454
080 190 - Mid-Tex Gas Division Addition 080.74811 37602 333,757
080 190 - Mid-Tex Gas Division Addition 080.74822 37601 75,451
080 190 - Mid-Tex Gas Division Addition 080.74822 37602 301,803
080 190 - Mid-Tex Gas Division Addition 080.74825 37602 93,053
080 190 - Mid-Tex Gas Division Addition 080.74825 38000 23,263
080 190 - Mid-Tex Gas Division Addition 080.74830 37602 29,037
080 190 - Mid-Tex Gas Division Addition 080.74830 37800 35,490
080 190 - Mid-Tex Gas Division Addition 080.74831 37602 55,343
080 190 - Mid-Tex Gas Division Addition 080.74831 37800 26,044
080 190 - Mid-Tex Gas Division Addition 080.74834 37602 1,480
080 190 - Mid-Tex Gas Division Addition 080.74835 37602 39,175
080 190 - Mid-Tex Gas Division Addition 080.74839 37602 34,257
080 190 - Mid-Tex Gas Division Addition 080.74839 37800 51,386
080 190 - Mid-Tex Gas Division Addition 080.74842 38000 7,365
080 190 - Mid-Tex Gas Division Addition 080.74845 37602 327,604
080 190 - Mid-Tex Gas Division Addition 080.74845 38000 71,913
080 190 - Mid-Tex Gas Division Addition 080.74847 37602 194,321
080 190 - Mid-Tex Gas Division Addition 080.74847 38000 194,321
080 190 - Mid-Tex Gas Division Addition 080.74851 37602 (648)
080 190 - Mid-Tex Gas Division Addition 080.74854 37602 156,779
080 190 - Mid-Tex Gas Division Addition 080.74854 38000 156,779
080 190 - Mid-Tex Gas Division Addition 080.74861 37602 606
080 190 - Mid-Tex Gas Division Addition 080.74861 38000 32
080 190 - Mid-Tex Gas Division Addition 080.74863 37602 3,613
080 190 - Mid-Tex Gas Division Addition 080.74863 38000 402
080 190 - Mid-Tex Gas Division Addition 080.74866 37602 40,758
080 190 - Mid-Tex Gas Division Addition 080.74866 37800 61,137
080 190 - Mid-Tex Gas Division Addition 080.74867 37602 55,444
080 190 - Mid-Tex Gas Division Addition 080.74867 37800 76,236
080 190 - Mid-Tex Gas Division Addition 080.74867 38000 6,931
080 190 - Mid-Tex Gas Division Addition 080.74868 38000 96,137
080 190 - Mid-Tex Gas Division Addition 080.74869 37602 81,498
080 190 - Mid-Tex Gas Division Addition 080.74869 37800 122,247
080 190 - Mid-Tex Gas Division Addition 080.74873 37602 42,088
080 190 - Mid-Tex Gas Division Addition 080.74873 37800 63,132
080 190 - Mid-Tex Gas Division Addition 080.74874 37602 36,261
080 190 - Mid-Tex Gas Division Addition 080.74874 37800 54,392
080 190 - Mid-Tex Gas Division Addition 080.74875 37602 33,454
080 190 - Mid-Tex Gas Division Addition 080.74875 37800 50,181
080 190 - Mid-Tex Gas Division Addition 080.74877 37602 39,293
080 190 - Mid-Tex Gas Division Addition 080.74877 37800 58,940
080 190 - Mid-Tex Gas Division Addition 080.74879 37602 92,178
080 190 - Mid-Tex Gas Division Addition 080.74879 37800 53,771
080 190 - Mid-Tex Gas Division Addition 080.74879 38000 7,682
080 190 - Mid-Tex Gas Division Addition 080.74880 37602 25,787
080 190 - Mid-Tex Gas Division Addition 080.74881 37602 663,271
080 190 - Mid-Tex Gas Division Addition 080.74881 38000 73,697
080 190 - Mid-Tex Gas Division Addition 080.74885 37602 32,299
080 190 - Mid-Tex Gas Division Addition 080.74887 37602 31,727
080 190 - Mid-Tex Gas Division Addition 080.74888 37600 770
080 190 - Mid-Tex Gas Division Addition 080.74888 37601 307,247
080 190 - Mid-Tex Gas Division Addition 080.74889 37602 10,576
080 190 - Mid-Tex Gas Division Addition 080.74890 37602 62,742
080 190 - Mid-Tex Gas Division Addition 080.74890 38100 2,406
080 190 - Mid-Tex Gas Division Addition 080.74892 37602 560
080 190 - Mid-Tex Gas Division Addition 080.74893 37602 153,501
080 190 - Mid-Tex Gas Division Addition 080.74893 38000 153,501
080 190 - Mid-Tex Gas Division Addition 080.74897 37602 9,308
080 190 - Mid-Tex Gas Division Addition 080.74898 37602 603,771
080 190 - Mid-Tex Gas Division Addition 080.74898 38000 284,635
080 190 - Mid-Tex Gas Division Addition 080.74906 37602 99,737
080 190 - Mid-Tex Gas Division Addition 080.74906 38000 (2,046)
080 190 - Mid-Tex Gas Division Addition 080.74909 37602 376,997
080 190 - Mid-Tex Gas Division Addition 080.74909 38000 165,445
080 190 - Mid-Tex Gas Division Addition 080.74913 37602 210
080 190 - Mid-Tex Gas Division Addition 080.74915 37602 (8,749)
080 190 - Mid-Tex Gas Division Addition 080.74915 38000 8,920
080 190 - Mid-Tex Gas Division Addition 080.74917 37602 54,030
080 190 - Mid-Tex Gas Division Addition 080.74918 37602 66,803
080 190 - Mid-Tex Gas Division Addition 080.74922 37602 171,971
080 190 - Mid-Tex Gas Division Addition 080.74924 37602 69,905
080 190 - Mid-Tex Gas Division Addition 080.74924 38000 129,823
080 190 - Mid-Tex Gas Division Addition 080.74925 37602 402,378
080 190 - Mid-Tex Gas Division Addition 080.74925 38000 268,252
080 190 - Mid-Tex Gas Division Addition 080.74927 37602 33,050
080 190 - Mid-Tex Gas Division Addition 080.74927 38000 334
080 190 - Mid-Tex Gas Division Addition 080.74930 37602 141,739
080 190 - Mid-Tex Gas Division Addition 080.74931 37602 75,779
080 190 - Mid-Tex Gas Division Addition 080.74934 37601 3,557
080 190 - Mid-Tex Gas Division Addition 080.74935 37602 22,636
080 190 - Mid-Tex Gas Division Addition 080.74937 37602 28,209
080 190 - Mid-Tex Gas Division Addition 080.74941 37602 355,318
080 190 - Mid-Tex Gas Division Addition 080.74941 38000 2
080 190 - Mid-Tex Gas Division Addition 080.74943 37602 108,728
080 190 - Mid-Tex Gas Division Addition 080.74945 37602 45,368
080 190 - Mid-Tex Gas Division Addition 080.74946 37602 92
080 190 - Mid-Tex Gas Division Addition 080.74946 37800 276
080 190 - Mid-Tex Gas Division Addition 080.74946 38000 233
080 190 - Mid-Tex Gas Division Addition 080.74946 38100 276
080 190 - Mid-Tex Gas Division Addition 080.74949 37602 14,573
080 190 - Mid-Tex Gas Division Addition 080.74950 38000 11,548
080 190 - Mid-Tex Gas Division Addition 080.74954 37602 5,390
080 190 - Mid-Tex Gas Division Addition 080.74955 37602 145,296
080 190 - Mid-Tex Gas Division Addition 080.74956 37601 (11,552)
080 190 - Mid-Tex Gas Division Addition 080.74958 37601 212,629
080 190 - Mid-Tex Gas Division Addition 080.74960 37602 275,924
080 190 - Mid-Tex Gas Division Addition 080.74961 37602 167,525
080 190 - Mid-Tex Gas Division Addition 080.74962 38000 1,188
080 190 - Mid-Tex Gas Division Addition 080.74962 38100 1,769
080 190 - Mid-Tex Gas Division Addition 080.74965 37602 1,778
080 190 - Mid-Tex Gas Division Addition 080.74966 37602 674,439
080 190 - Mid-Tex Gas Division Addition 080.74968 37602 20,479
080 190 - Mid-Tex Gas Division Addition 080.74969 37602 60,543
080 190 - Mid-Tex Gas Division Addition 080.74970 37601 -
MTX Additions by FERC
Page 81 of 101
479
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.74970 37602 69,185
080 190 - Mid-Tex Gas Division Addition 080.74979 37602 (5,710)
080 190 - Mid-Tex Gas Division Addition 080.74980 37602 97,166
080 190 - Mid-Tex Gas Division Addition 080.74981 37602 535,797
080 190 - Mid-Tex Gas Division Addition 080.74981 38000 59,533
080 190 - Mid-Tex Gas Division Addition 080.74982 37602 119,527
080 190 - Mid-Tex Gas Division Addition 080.74983 37602 374,615
080 190 - Mid-Tex Gas Division Addition 080.74983 38000 160,549
080 190 - Mid-Tex Gas Division Addition 080.74984 37602 325,206
080 190 - Mid-Tex Gas Division Addition 080.74984 38000 6,637
080 190 - Mid-Tex Gas Division Addition 080.74985 37800 130,053
080 190 - Mid-Tex Gas Division Addition 080.74986 37602 17,086
080 190 - Mid-Tex Gas Division Addition 080.74986 38000 7,323
080 190 - Mid-Tex Gas Division Addition 080.74988 38000 118,863
080 190 - Mid-Tex Gas Division Addition 080.74990 37602 3,859
080 190 - Mid-Tex Gas Division Addition 080.74991 37602 21,780
080 190 - Mid-Tex Gas Division Addition 080.74993 37601 469,174
080 190 - Mid-Tex Gas Division Addition 080.74993 37602 8,231
080 190 - Mid-Tex Gas Division Addition 080.74993 38000 313,884
080 190 - Mid-Tex Gas Division Addition 080.74996 37602 386,639
080 190 - Mid-Tex Gas Division Addition 080.74996 38000 96,660
080 190 - Mid-Tex Gas Division Addition 080.75001 37602 10
080 190 - Mid-Tex Gas Division Addition 080.75001 38000 (2)
080 190 - Mid-Tex Gas Division Addition 080.75012 37602 1
080 190 - Mid-Tex Gas Division Addition 080.75012 37800 10
080 190 - Mid-Tex Gas Division Addition 080.75012 38000 10
080 190 - Mid-Tex Gas Division Addition 080.75012 38100 621
080 190 - Mid-Tex Gas Division Addition 080.75015 37602 415,366
080 190 - Mid-Tex Gas Division Addition 080.75017 37602 12,916
080 190 - Mid-Tex Gas Division Addition 080.75018 37602 47,131
080 190 - Mid-Tex Gas Division Addition 080.75021 37602 1,608
080 190 - Mid-Tex Gas Division Addition 080.75023 37602 31,675
080 190 - Mid-Tex Gas Division Addition 080.75025 37602 341,492
080 190 - Mid-Tex Gas Division Addition 080.75025 38000 7,850
080 190 - Mid-Tex Gas Division Addition 080.75029 37602 834
080 190 - Mid-Tex Gas Division Addition 080.75029 38000 93
080 190 - Mid-Tex Gas Division Addition 080.75032 37602 376,728
080 190 - Mid-Tex Gas Division Addition 080.75032 38000 88,368
080 190 - Mid-Tex Gas Division Addition 080.75033 39800 (34)
080 190 - Mid-Tex Gas Division Addition 080.75041 37602 1,392
080 190 - Mid-Tex Gas Division Addition 080.75041 38000 246
080 190 - Mid-Tex Gas Division Addition 080.75043 37602 103,751
080 190 - Mid-Tex Gas Division Addition 080.75045 37602 34,517
080 190 - Mid-Tex Gas Division Addition 080.75047 37602 11,923
080 190 - Mid-Tex Gas Division Addition 080.75048 37602 362,332
080 190 - Mid-Tex Gas Division Addition 080.75048 38000 120,777
080 190 - Mid-Tex Gas Division Addition 080.75049 37602 480
080 190 - Mid-Tex Gas Division Addition 080.75052 37602 21,019
080 190 - Mid-Tex Gas Division Addition 080.75053 37601 58,495
080 190 - Mid-Tex Gas Division Addition 080.75054 37602 1,688
080 190 - Mid-Tex Gas Division Addition 080.75058 37602 936,659
080 190 - Mid-Tex Gas Division Addition 080.75058 38000 152,479
080 190 - Mid-Tex Gas Division Addition 080.75059 37602 288,793
080 190 - Mid-Tex Gas Division Addition 080.75059 38000 277,467
080 190 - Mid-Tex Gas Division Addition 080.75060 37602 14,352
080 190 - Mid-Tex Gas Division Addition 080.75060 38000 (0)
080 190 - Mid-Tex Gas Division Addition 080.75060 38500 3,588
080 190 - Mid-Tex Gas Division Addition 080.75064 37602 (3,382)
080 190 - Mid-Tex Gas Division Addition 080.75066 37602 807
080 190 - Mid-Tex Gas Division Addition 080.75068 37602 299,944
080 190 - Mid-Tex Gas Division Addition 080.75068 38000 99,981
080 190 - Mid-Tex Gas Division Addition 080.75069 37602 320,354
080 190 - Mid-Tex Gas Division Addition 080.75069 38000 20,448
080 190 - Mid-Tex Gas Division Addition 080.75071 37602 311,276
080 190 - Mid-Tex Gas Division Addition 080.75071 38000 16,383
080 190 - Mid-Tex Gas Division Addition 080.75072 37602 632,752
080 190 - Mid-Tex Gas Division Addition 080.75072 38000 421,835
080 190 - Mid-Tex Gas Division Addition 080.75073 37602 324,024
080 190 - Mid-Tex Gas Division Addition 080.75073 38000 17,054
080 190 - Mid-Tex Gas Division Addition 080.75074 37602 399,712
080 190 - Mid-Tex Gas Division Addition 080.75074 38000 327,037
080 190 - Mid-Tex Gas Division Addition 080.75076 37602 16,086
080 190 - Mid-Tex Gas Division Addition 080.75077 37601 6,122
080 190 - Mid-Tex Gas Division Addition 080.75077 37602 51,423
080 190 - Mid-Tex Gas Division Addition 080.75077 37800 64,891
080 190 - Mid-Tex Gas Division Addition 080.75078 37602 604,591
080 190 - Mid-Tex Gas Division Addition 080.75078 38000 31,821
080 190 - Mid-Tex Gas Division Addition 080.75082 37602 659
080 190 - Mid-Tex Gas Division Addition 080.75083 37602 470,705
080 190 - Mid-Tex Gas Division Addition 080.75083 38000 201,731
080 190 - Mid-Tex Gas Division Addition 080.75084 37601 1,950,503
080 190 - Mid-Tex Gas Division Addition 080.75084 37800 428,159
080 190 - Mid-Tex Gas Division Addition 080.75089 37602 51,988
080 190 - Mid-Tex Gas Division Addition 080.75090 37602 3,036
080 190 - Mid-Tex Gas Division Addition 080.75091 37602 275,317
080 190 - Mid-Tex Gas Division Addition 080.75091 37800 32,390
080 190 - Mid-Tex Gas Division Addition 080.75091 38000 16,195
080 190 - Mid-Tex Gas Division Addition 080.75094 37602 26
080 190 - Mid-Tex Gas Division Addition 080.75097 37602 3,850
080 190 - Mid-Tex Gas Division Addition 080.75098 37602 12,410
080 190 - Mid-Tex Gas Division Addition 080.75102 37602 45,684
080 190 - Mid-Tex Gas Division Addition 080.75108 37602 9,725
080 190 - Mid-Tex Gas Division Addition 080.75110 37602 3,958
080 190 - Mid-Tex Gas Division Addition 080.75112 37602 8,851
080 190 - Mid-Tex Gas Division Addition 080.75112 38000 1,562
080 190 - Mid-Tex Gas Division Addition 080.75115 37602 89,323
080 190 - Mid-Tex Gas Division Addition 080.75115 38000 22,331
080 190 - Mid-Tex Gas Division Addition 080.75124 37601 13,221
080 190 - Mid-Tex Gas Division Addition 080.75124 37602 224,761
080 190 - Mid-Tex Gas Division Addition 080.75124 38000 26,442
080 190 - Mid-Tex Gas Division Addition 080.75129 37602 7,454
080 190 - Mid-Tex Gas Division Addition 080.75130 37602 32,720
080 190 - Mid-Tex Gas Division Addition 080.75132 37602 1,744
080 190 - Mid-Tex Gas Division Addition 080.75133 37602 319,096
080 190 - Mid-Tex Gas Division Addition 080.75133 38000 136,755
080 190 - Mid-Tex Gas Division Addition 080.75146 37602 378,471
080 190 - Mid-Tex Gas Division Addition 080.75146 38000 378,471
MTX Additions by FERC
Page 82 of 101
480
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.75147 37602 459,336
080 190 - Mid-Tex Gas Division Addition 080.75147 38000 459,336
080 190 - Mid-Tex Gas Division Addition 080.75148 39800 -
080 190 - Mid-Tex Gas Division Addition 080.75149 37602 3,532
080 190 - Mid-Tex Gas Division Addition 080.75152 37602 62,976
080 190 - Mid-Tex Gas Division Addition 080.75152 38000 636
080 190 - Mid-Tex Gas Division Addition 080.75158 37602 13,541
080 190 - Mid-Tex Gas Division Addition 080.75159 37602 374,118
080 190 - Mid-Tex Gas Division Addition 080.75159 38000 374,118
080 190 - Mid-Tex Gas Division Addition 080.75160 37602 264,785
080 190 - Mid-Tex Gas Division Addition 080.75160 38000 52,957
080 190 - Mid-Tex Gas Division Addition 080.75161 37602 908,905
080 190 - Mid-Tex Gas Division Addition 080.75161 38000 181,781
080 190 - Mid-Tex Gas Division Addition 080.75162 37602 239,452
080 190 - Mid-Tex Gas Division Addition 080.75162 38000 26,606
080 190 - Mid-Tex Gas Division Addition 080.75164 37602 181,509
080 190 - Mid-Tex Gas Division Addition 080.75165 37602 215,398
080 190 - Mid-Tex Gas Division Addition 080.75170 37800 28,682
080 190 - Mid-Tex Gas Division Addition 080.75171 37602 18,528
080 190 - Mid-Tex Gas Division Addition 080.75171 37800 78,558
080 190 - Mid-Tex Gas Division Addition 080.75174 37602 34,316
080 190 - Mid-Tex Gas Division Addition 080.75174 37800 51,335
080 190 - Mid-Tex Gas Division Addition 080.75175 37800 5,743
080 190 - Mid-Tex Gas Division Addition 080.75184 37602 231,566
080 190 - Mid-Tex Gas Division Addition 080.75184 38000 77,189
080 190 - Mid-Tex Gas Division Addition 080.75186 37602 20,390
080 190 - Mid-Tex Gas Division Addition 080.75188 37602 270,506
080 190 - Mid-Tex Gas Division Addition 080.75188 38000 14,237
080 190 - Mid-Tex Gas Division Addition 080.75190 37602 127,354
080 190 - Mid-Tex Gas Division Addition 080.75190 38000 104,199
080 190 - Mid-Tex Gas Division Addition 080.75195 37800 13,081
080 190 - Mid-Tex Gas Division Addition 080.75196 37601 6,307
080 190 - Mid-Tex Gas Division Addition 080.75196 37602 13,876
080 190 - Mid-Tex Gas Division Addition 080.75196 37900 42,890
080 190 - Mid-Tex Gas Division Addition 080.75198 37602 39,776
080 190 - Mid-Tex Gas Division Addition 080.75198 37900 107,543
080 190 - Mid-Tex Gas Division Addition 080.75199 37602 30,131
080 190 - Mid-Tex Gas Division Addition 080.75199 37800 80,686
080 190 - Mid-Tex Gas Division Addition 080.75200 37602 47,738
080 190 - Mid-Tex Gas Division Addition 080.75200 37800 47,738
080 190 - Mid-Tex Gas Division Addition 080.75202 37602 56,635
080 190 - Mid-Tex Gas Division Addition 080.75203 37601 6,315
080 190 - Mid-Tex Gas Division Addition 080.75203 37602 17,052
080 190 - Mid-Tex Gas Division Addition 080.75203 37800 39,787
080 190 - Mid-Tex Gas Division Addition 080.75204 37602 118,367
080 190 - Mid-Tex Gas Division Addition 080.75208 37602 2,930
080 190 - Mid-Tex Gas Division Addition 080.75210 37601 6,264
080 190 - Mid-Tex Gas Division Addition 080.75210 37602 15,661
080 190 - Mid-Tex Gas Division Addition 080.75210 37800 40,718
080 190 - Mid-Tex Gas Division Addition 080.75211 37602 29,256
080 190 - Mid-Tex Gas Division Addition 080.75211 37800 43,836
080 190 - Mid-Tex Gas Division Addition 080.75213 37602 343,980
080 190 - Mid-Tex Gas Division Addition 080.75214 37602 70,096
080 190 - Mid-Tex Gas Division Addition 080.75214 37800 46,731
080 190 - Mid-Tex Gas Division Addition 080.75215 37602 31,919
080 190 - Mid-Tex Gas Division Addition 080.75215 37800 47,879
080 190 - Mid-Tex Gas Division Addition 080.75216 37601 6,319
080 190 - Mid-Tex Gas Division Addition 080.75216 37602 17,061
080 190 - Mid-Tex Gas Division Addition 080.75216 37800 39,809
080 190 - Mid-Tex Gas Division Addition 080.75217 37600 29,997
080 190 - Mid-Tex Gas Division Addition 080.75219 37602 188,329
080 190 - Mid-Tex Gas Division Addition 080.75219 37800 62,776
080 190 - Mid-Tex Gas Division Addition 080.75219 38000 167,404
080 190 - Mid-Tex Gas Division Addition 080.75221 37601 7,456
080 190 - Mid-Tex Gas Division Addition 080.75221 37602 9,941
080 190 - Mid-Tex Gas Division Addition 080.75221 37800 44,734
080 190 - Mid-Tex Gas Division Addition 080.75222 37602 74,113
080 190 - Mid-Tex Gas Division Addition 080.75225 37602 100,609
080 190 - Mid-Tex Gas Division Addition 080.75227 37601 7,961
080 190 - Mid-Tex Gas Division Addition 080.75227 37602 21,495
080 190 - Mid-Tex Gas Division Addition 080.75227 37800 50,155
080 190 - Mid-Tex Gas Division Addition 080.75228 37602 975,368
080 190 - Mid-Tex Gas Division Addition 080.75228 38000 51,335
080 190 - Mid-Tex Gas Division Addition 080.75229 37602 222,447
080 190 - Mid-Tex Gas Division Addition 080.75233 37602 290,967
080 190 - Mid-Tex Gas Division Addition 080.75236 37601 6,415
080 190 - Mid-Tex Gas Division Addition 080.75236 37602 64,148
080 190 - Mid-Tex Gas Division Addition 080.75236 37800 57,618
080 190 - Mid-Tex Gas Division Addition 080.75239 37601 20,349
080 190 - Mid-Tex Gas Division Addition 080.75239 37602 32,559
080 190 - Mid-Tex Gas Division Addition 080.75239 37800 48,838
080 190 - Mid-Tex Gas Division Addition 080.75243 37601 23,875
080 190 - Mid-Tex Gas Division Addition 080.75243 37602 11,938
080 190 - Mid-Tex Gas Division Addition 080.75243 37800 83,563
080 190 - Mid-Tex Gas Division Addition 080.75248 37602 17,656
080 190 - Mid-Tex Gas Division Addition 080.75251 37602 39,003
080 190 - Mid-Tex Gas Division Addition 080.75251 37800 31,912
080 190 - Mid-Tex Gas Division Addition 080.75254 37602 42,742
080 190 - Mid-Tex Gas Division Addition 080.75256 37602 52,003
080 190 - Mid-Tex Gas Division Addition 080.75256 37800 52,003
080 190 - Mid-Tex Gas Division Addition 080.75259 37602 708,893
080 190 - Mid-Tex Gas Division Addition 080.75259 38000 303,811
080 190 - Mid-Tex Gas Division Addition 080.75260 37602 80,041
080 190 - Mid-Tex Gas Division Addition 080.75261 37602 688,018
080 190 - Mid-Tex Gas Division Addition 080.75261 38000 458,678
080 190 - Mid-Tex Gas Division Addition 080.75262 37602 113,015
080 190 - Mid-Tex Gas Division Addition 080.75263 37602 163,232
080 190 - Mid-Tex Gas Division Addition 080.75263 38000 40,808
080 190 - Mid-Tex Gas Division Addition 080.75270 37602 2,547
080 190 - Mid-Tex Gas Division Addition 080.75273 37601 4,176
080 190 - Mid-Tex Gas Division Addition 080.75274 37602 11,802
080 190 - Mid-Tex Gas Division Addition 080.75276 37602 476,685
080 190 - Mid-Tex Gas Division Addition 080.75276 38000 317,790
080 190 - Mid-Tex Gas Division Addition 080.75278 37602 434,220
080 190 - Mid-Tex Gas Division Addition 080.75278 38000 15,283
080 190 - Mid-Tex Gas Division Addition 080.75279 37602 336,900
080 190 - Mid-Tex Gas Division Addition 080.75279 38000 13,308
MTX Additions by FERC
Page 83 of 101
481
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.75280 37602 307,964
080 190 - Mid-Tex Gas Division Addition 080.75280 38000 251,971
080 190 - Mid-Tex Gas Division Addition 080.75281 37602 377,480
080 190 - Mid-Tex Gas Division Addition 080.75281 38000 14,097
080 190 - Mid-Tex Gas Division Addition 080.75286 37602 10,997
080 190 - Mid-Tex Gas Division Addition 080.75289 37602 22,680
080 190 - Mid-Tex Gas Division Addition 080.75293 37602 132,044
080 190 - Mid-Tex Gas Division Addition 080.75299 37602 715,915
080 190 - Mid-Tex Gas Division Addition 080.75301 37602 322,247
080 190 - Mid-Tex Gas Division Addition 080.75301 38000 16,960
080 190 - Mid-Tex Gas Division Addition 080.75303 37602 252
080 190 - Mid-Tex Gas Division Addition 080.75313 37602 1,370
080 190 - Mid-Tex Gas Division Addition 080.75313 38100 60,070
080 190 - Mid-Tex Gas Division Addition 080.75314 37602 351,388
080 190 - Mid-Tex Gas Division Addition 080.75314 38000 123,461
080 190 - Mid-Tex Gas Division Addition 080.75315 37602 58,774
080 190 - Mid-Tex Gas Division Addition 080.75315 37800 48,087
080 190 - Mid-Tex Gas Division Addition 080.75317 37602 31,212
080 190 - Mid-Tex Gas Division Addition 080.75318 37602 29,977
080 190 - Mid-Tex Gas Division Addition 080.75319 38000 301
080 190 - Mid-Tex Gas Division Addition 080.75321 37601 4,928
080 190 - Mid-Tex Gas Division Addition 080.75321 37602 49,281
080 190 - Mid-Tex Gas Division Addition 080.75321 37800 44,334
080 190 - Mid-Tex Gas Division Addition 080.75322 39000 -
080 190 - Mid-Tex Gas Division Addition 080.75327 37601 (22,688)
080 190 - Mid-Tex Gas Division Addition 080.75328 37602 283,010
080 190 - Mid-Tex Gas Division Addition 080.75330 37602 15,662
080 190 - Mid-Tex Gas Division Addition 080.75334 37602 (42)
080 190 - Mid-Tex Gas Division Addition 080.75335 37602 495,248
080 190 - Mid-Tex Gas Division Addition 080.75336 37602 1,382
080 190 - Mid-Tex Gas Division Addition 080.75341 37602 85,427
080 190 - Mid-Tex Gas Division Addition 080.75341 38000 54,617
080 190 - Mid-Tex Gas Division Addition 080.75342 37602 189,608
080 190 - Mid-Tex Gas Division Addition 080.75342 38000 33,460
080 190 - Mid-Tex Gas Division Addition 080.75343 37602 108,072
080 190 - Mid-Tex Gas Division Addition 080.75343 38000 32,281
080 190 - Mid-Tex Gas Division Addition 080.75351 37602 3,361
080 190 - Mid-Tex Gas Division Addition 080.75354 37602 204,251
080 190 - Mid-Tex Gas Division Addition 080.75354 38000 20,201
080 190 - Mid-Tex Gas Division Addition 080.75356 37602 403,584
080 190 - Mid-Tex Gas Division Addition 080.75356 38000 100,896
080 190 - Mid-Tex Gas Division Addition 080.75357 39000 -
080 190 - Mid-Tex Gas Division Addition 080.75359 37602 140,415
080 190 - Mid-Tex Gas Division Addition 080.75367 37602 22,405
080 190 - Mid-Tex Gas Division Addition 080.75367 37800 67,215
080 190 - Mid-Tex Gas Division Addition 080.75368 37602 409,208
080 190 - Mid-Tex Gas Division Addition 080.75368 38000 45,468
080 190 - Mid-Tex Gas Division Addition 080.75369 37602 450,615
080 190 - Mid-Tex Gas Division Addition 080.75370 37602 31,961
080 190 - Mid-Tex Gas Division Addition 080.75378 37602 15,177
080 190 - Mid-Tex Gas Division Addition 080.75379 37602 209,553
080 190 - Mid-Tex Gas Division Addition 080.75379 37800 26,194
080 190 - Mid-Tex Gas Division Addition 080.75379 38000 26,194
080 190 - Mid-Tex Gas Division Addition 080.75380 37602 69,209
080 190 - Mid-Tex Gas Division Addition 080.75380 37800 56,626
080 190 - Mid-Tex Gas Division Addition 080.75381 37602 127,052
080 190 - Mid-Tex Gas Division Addition 080.75381 37800 127,052
080 190 - Mid-Tex Gas Division Addition 080.75383 37602 46,917
080 190 - Mid-Tex Gas Division Addition 080.75383 37800 57,343
080 190 - Mid-Tex Gas Division Addition 080.75384 37602 (14,122)
080 190 - Mid-Tex Gas Division Addition 080.75392 37600 101,745
080 190 - Mid-Tex Gas Division Addition 080.75393 38000 1,581
080 190 - Mid-Tex Gas Division Addition 080.75396 37602 67,335
080 190 - Mid-Tex Gas Division Addition 080.75398 37602 338,334
080 190 - Mid-Tex Gas Division Addition 080.75398 38000 59,706
080 190 - Mid-Tex Gas Division Addition 080.75399 37602 144,805
080 190 - Mid-Tex Gas Division Addition 080.75399 37800 199,107
080 190 - Mid-Tex Gas Division Addition 080.75399 38000 18,101
080 190 - Mid-Tex Gas Division Addition 080.75400 37602 481,056
080 190 - Mid-Tex Gas Division Addition 080.75400 38000 197,694
080 190 - Mid-Tex Gas Division Addition 080.75402 37602 192,330
080 190 - Mid-Tex Gas Division Addition 080.75402 38000 103,562
080 190 - Mid-Tex Gas Division Addition 080.75404 37602 338,543
080 190 - Mid-Tex Gas Division Addition 080.75404 38000 50,587
080 190 - Mid-Tex Gas Division Addition 080.75408 37602 276,816
080 190 - Mid-Tex Gas Division Addition 080.75408 38000 20,836
080 190 - Mid-Tex Gas Division Addition 080.75409 37602 193,217
080 190 - Mid-Tex Gas Division Addition 080.75409 38000 128,812
080 190 - Mid-Tex Gas Division Addition 080.75411 37602 383,952
080 190 - Mid-Tex Gas Division Addition 080.75411 38000 95,988
080 190 - Mid-Tex Gas Division Addition 080.75413 37602 192,315
080 190 - Mid-Tex Gas Division Addition 080.75413 38000 21,368
080 190 - Mid-Tex Gas Division Addition 080.75421 37602 100,686
080 190 - Mid-Tex Gas Division Addition 080.75425 37602 259,073
080 190 - Mid-Tex Gas Division Addition 080.75428 37602 6,169
080 190 - Mid-Tex Gas Division Addition 080.75428 38000 685
080 190 - Mid-Tex Gas Division Addition 080.75430 37602 110,596
080 190 - Mid-Tex Gas Division Addition 080.75440 37602 26,884
080 190 - Mid-Tex Gas Division Addition 080.75440 38000 1,415
080 190 - Mid-Tex Gas Division Addition 080.75442 38000 (7)
080 190 - Mid-Tex Gas Division Addition 080.75445 37602 177,989
080 190 - Mid-Tex Gas Division Addition 080.75446 37800 8,472
080 190 - Mid-Tex Gas Division Addition 080.75447 37800 9,156
080 190 - Mid-Tex Gas Division Addition 080.75454 37601 -
080 190 - Mid-Tex Gas Division Addition 080.75454 37602 77,083
080 190 - Mid-Tex Gas Division Addition 080.75459 37602 531,767
080 190 - Mid-Tex Gas Division Addition 080.75459 38000 177,256
080 190 - Mid-Tex Gas Division Addition 080.75461 37602 (57,515)
080 190 - Mid-Tex Gas Division Addition 080.75464 37601 6,956
080 190 - Mid-Tex Gas Division Addition 080.75464 37602 31,303
080 190 - Mid-Tex Gas Division Addition 080.75464 37800 31,303
080 190 - Mid-Tex Gas Division Addition 080.75465 37601 3,373
080 190 - Mid-Tex Gas Division Addition 080.75465 37602 30,355
080 190 - Mid-Tex Gas Division Addition 080.75465 37800 37,100
080 190 - Mid-Tex Gas Division Addition 080.75466 37602 141,460
080 190 - Mid-Tex Gas Division Addition 080.75466 37800 141,461
080 190 - Mid-Tex Gas Division Addition 080.75473 37602 155,231
MTX Additions by FERC
Page 84 of 101
482
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.75473 38000 3,168
080 190 - Mid-Tex Gas Division Addition 080.75483 38100 175,283
080 190 - Mid-Tex Gas Division Addition 080.75485 37601 5,744
080 190 - Mid-Tex Gas Division Addition 080.75485 37602 63,180
080 190 - Mid-Tex Gas Division Addition 080.75485 37800 45,954
080 190 - Mid-Tex Gas Division Addition 080.75486 37602 163,824
080 190 - Mid-Tex Gas Division Addition 080.75486 38000 18,203
080 190 - Mid-Tex Gas Division Addition 080.75488 37602 272,194
080 190 - Mid-Tex Gas Division Addition 080.75488 37800 32,023
080 190 - Mid-Tex Gas Division Addition 080.75488 38000 16,011
080 190 - Mid-Tex Gas Division Addition 080.75489 37601 6,478
080 190 - Mid-Tex Gas Division Addition 080.75489 37602 71,254
080 190 - Mid-Tex Gas Division Addition 080.75489 37800 51,821
080 190 - Mid-Tex Gas Division Addition 080.75490 37602 155,160
080 190 - Mid-Tex Gas Division Addition 080.75490 38000 66,497
080 190 - Mid-Tex Gas Division Addition 080.75493 37601 8,641
080 190 - Mid-Tex Gas Division Addition 080.75493 37602 38,883
080 190 - Mid-Tex Gas Division Addition 080.75493 37800 38,851
080 190 - Mid-Tex Gas Division Addition 080.75499 37602 3,064
080 190 - Mid-Tex Gas Division Addition 080.75504 37602 14,969
080 190 - Mid-Tex Gas Division Addition 080.75505 37602 27,262
080 190 - Mid-Tex Gas Division Addition 080.75506 37602 58,473
080 190 - Mid-Tex Gas Division Addition 080.75507 37602 970,066
080 190 - Mid-Tex Gas Division Addition 080.75507 38000 323,355
080 190 - Mid-Tex Gas Division Addition 080.75508 37602 32,289
080 190 - Mid-Tex Gas Division Addition 080.75509 37602 28,396
080 190 - Mid-Tex Gas Division Addition 080.75509 38000 2
080 190 - Mid-Tex Gas Division Addition 080.75515 39903 4,867
080 190 - Mid-Tex Gas Division Addition 080.75517 37602 2,291
080 190 - Mid-Tex Gas Division Addition 080.75520 37602 59,858
080 190 - Mid-Tex Gas Division Addition 080.75520 38000 1,222
080 190 - Mid-Tex Gas Division Addition 080.75521 39400 4,782
080 190 - Mid-Tex Gas Division Addition 080.75525 37602 46,035
080 190 - Mid-Tex Gas Division Addition 080.75529 37602 360,252
080 190 - Mid-Tex Gas Division Addition 080.75541 37602 161,563
080 190 - Mid-Tex Gas Division Addition 080.75541 38000 15,979
080 190 - Mid-Tex Gas Division Addition 080.75547 37602 345,810
080 190 - Mid-Tex Gas Division Addition 080.75547 38000 186,205
080 190 - Mid-Tex Gas Division Addition 080.75551 37602 445,701
080 190 - Mid-Tex Gas Division Addition 080.75552 37602 31,872
080 190 - Mid-Tex Gas Division Addition 080.75556 37601 5,922
080 190 - Mid-Tex Gas Division Addition 080.75556 37602 32,570
080 190 - Mid-Tex Gas Division Addition 080.75556 37800 20,727
080 190 - Mid-Tex Gas Division Addition 080.75557 37602 3,644
080 190 - Mid-Tex Gas Division Addition 080.75558 37602 78,222
080 190 - Mid-Tex Gas Division Addition 080.75558 37800 64,000
080 190 - Mid-Tex Gas Division Addition 080.75559 37602 28,085
080 190 - Mid-Tex Gas Division Addition 080.75560 37602 585,488
080 190 - Mid-Tex Gas Division Addition 080.75560 38000 103,321
080 190 - Mid-Tex Gas Division Addition 080.75561 37602 (19,523)
080 190 - Mid-Tex Gas Division Addition 080.75562 37601 7,536
080 190 - Mid-Tex Gas Division Addition 080.75562 37602 41,446
080 190 - Mid-Tex Gas Division Addition 080.75562 37800 26,375
080 190 - Mid-Tex Gas Division Addition 080.75563 37601 7,362
080 190 - Mid-Tex Gas Division Addition 080.75563 37602 40,489
080 190 - Mid-Tex Gas Division Addition 080.75563 37800 25,765
080 190 - Mid-Tex Gas Division Addition 080.75565 37602 18,733
080 190 - Mid-Tex Gas Division Addition 080.75565 37800 18,733
080 190 - Mid-Tex Gas Division Addition 080.75567 38000 747,770
080 190 - Mid-Tex Gas Division Addition 080.75571 38000 178,350
080 190 - Mid-Tex Gas Division Addition 080.75574 37602 298,003
080 190 - Mid-Tex Gas Division Addition 080.75575 37602 368,469
080 190 - Mid-Tex Gas Division Addition 080.75575 38000 40,941
080 190 - Mid-Tex Gas Division Addition 080.75578 37602 529,213
080 190 - Mid-Tex Gas Division Addition 080.75578 38000 132,303
080 190 - Mid-Tex Gas Division Addition 080.75579 37602 77,408
080 190 - Mid-Tex Gas Division Addition 080.75580 37602 566,123
080 190 - Mid-Tex Gas Division Addition 080.75581 38000 3,099
080 190 - Mid-Tex Gas Division Addition 080.75582 39000 75
080 190 - Mid-Tex Gas Division Addition 080.75584 37602 143,923
080 190 - Mid-Tex Gas Division Addition 080.75585 37602 7,016
080 190 - Mid-Tex Gas Division Addition 080.75587 37602 135,030
080 190 - Mid-Tex Gas Division Addition 080.75588 37602 23,533
080 190 - Mid-Tex Gas Division Addition 080.75589 37602 213,591
080 190 - Mid-Tex Gas Division Addition 080.75598 37602 587,566
080 190 - Mid-Tex Gas Division Addition 080.75598 38000 146,891
080 190 - Mid-Tex Gas Division Addition 080.75600 37602 49,720
080 190 - Mid-Tex Gas Division Addition 080.75601 37800 28,520
080 190 - Mid-Tex Gas Division Addition 080.75604 37602 70,723
080 190 - Mid-Tex Gas Division Addition 080.75605 38000 696,725
080 190 - Mid-Tex Gas Division Addition 080.75606 37602 125,440
080 190 - Mid-Tex Gas Division Addition 080.75606 38000 6,602
080 190 - Mid-Tex Gas Division Addition 080.75608 37602 459,369
080 190 - Mid-Tex Gas Division Addition 080.75608 38000 153,123
080 190 - Mid-Tex Gas Division Addition 080.75615 37602 48,944
080 190 - Mid-Tex Gas Division Addition 080.75618 37602 587,621
080 190 - Mid-Tex Gas Division Addition 080.75618 38000 276,527
080 190 - Mid-Tex Gas Division Addition 080.75620 37602 52,220
080 190 - Mid-Tex Gas Division Addition 080.75624 37602 291,513
080 190 - Mid-Tex Gas Division Addition 080.75624 38000 156,968
080 190 - Mid-Tex Gas Division Addition 080.75625 37602 211,379
080 190 - Mid-Tex Gas Division Addition 080.75625 38000 246,609
080 190 - Mid-Tex Gas Division Addition 080.75628 37602 212,192
080 190 - Mid-Tex Gas Division Addition 080.75628 38000 4,330
080 190 - Mid-Tex Gas Division Addition 080.75629 37602 146,551
080 190 - Mid-Tex Gas Division Addition 080.75630 39400 1,759
080 190 - Mid-Tex Gas Division Addition 080.75635 37602 128,663
080 190 - Mid-Tex Gas Division Addition 080.75640 37602 19,783
080 190 - Mid-Tex Gas Division Addition 080.75642 37602 378,671
080 190 - Mid-Tex Gas Division Addition 080.75642 38000 66,824
080 190 - Mid-Tex Gas Division Addition 080.75644 37602 5,826
080 190 - Mid-Tex Gas Division Addition 080.75646 37602 253,462
080 190 - Mid-Tex Gas Division Addition 080.75647 37602 1,027,897
080 190 - Mid-Tex Gas Division Addition 080.75647 38000 440,527
080 190 - Mid-Tex Gas Division Addition 080.75648 37602 876,688
080 190 - Mid-Tex Gas Division Addition 080.75648 38000 154,710
080 190 - Mid-Tex Gas Division Addition 080.75649 37602 69,363
MTX Additions by FERC
Page 85 of 101
483
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.75649 38000 1,416
080 190 - Mid-Tex Gas Division Addition 080.75650 37602 666,689
080 190 - Mid-Tex Gas Division Addition 080.75650 38000 117,651
080 190 - Mid-Tex Gas Division Addition 080.75651 37602 989,742
080 190 - Mid-Tex Gas Division Addition 080.75651 38000 247,436
080 190 - Mid-Tex Gas Division Addition 080.75653 37602 984,685
080 190 - Mid-Tex Gas Division Addition 080.75653 38000 328,228
080 190 - Mid-Tex Gas Division Addition 080.75654 37602 15,540
080 190 - Mid-Tex Gas Division Addition 080.75656 37602 428,975
080 190 - Mid-Tex Gas Division Addition 080.75656 38000 75,701
080 190 - Mid-Tex Gas Division Addition 080.75657 37602 80,346
080 190 - Mid-Tex Gas Division Addition 080.75658 37602 454,162
080 190 - Mid-Tex Gas Division Addition 080.75658 38000 119,218
080 190 - Mid-Tex Gas Division Addition 080.75660 37602 31,952
080 190 - Mid-Tex Gas Division Addition 080.75666 37602 480,081
080 190 - Mid-Tex Gas Division Addition 080.75672 37602 54,004
080 190 - Mid-Tex Gas Division Addition 080.75676 37602 8,083
080 190 - Mid-Tex Gas Division Addition 080.75682 38000 26,242
080 190 - Mid-Tex Gas Division Addition 080.75682 38500 4,631
080 190 - Mid-Tex Gas Division Addition 080.75690 37602 419,197
080 190 - Mid-Tex Gas Division Addition 080.75694 37602 180,780
080 190 - Mid-Tex Gas Division Addition 080.75698 37602 672,812
080 190 - Mid-Tex Gas Division Addition 080.75698 38000 36,008
080 190 - Mid-Tex Gas Division Addition 080.75702 37602 35,995
080 190 - Mid-Tex Gas Division Addition 080.75705 37602 346,501
080 190 - Mid-Tex Gas Division Addition 080.75705 38000 97,731
080 190 - Mid-Tex Gas Division Addition 080.75706 37601 9,393
080 190 - Mid-Tex Gas Division Addition 080.75706 37602 84,533
080 190 - Mid-Tex Gas Division Addition 080.75709 37602 17,425
080 190 - Mid-Tex Gas Division Addition 080.75712 37602 379,221
080 190 - Mid-Tex Gas Division Addition 080.75712 38000 42,136
080 190 - Mid-Tex Gas Division Addition 080.75713 39906 220,761
080 190 - Mid-Tex Gas Division Addition 080.75716 37601 25,600
080 190 - Mid-Tex Gas Division Addition 080.75716 37602 68,267
080 190 - Mid-Tex Gas Division Addition 080.75716 37800 76,830
080 190 - Mid-Tex Gas Division Addition 080.75717 37601 16,102
080 190 - Mid-Tex Gas Division Addition 080.75717 37602 80,509
080 190 - Mid-Tex Gas Division Addition 080.75717 37800 64,408
080 190 - Mid-Tex Gas Division Addition 080.75720 37602 101,846
080 190 - Mid-Tex Gas Division Addition 080.75720 38000 5,360
080 190 - Mid-Tex Gas Division Addition 080.75722 37602 121,383
080 190 - Mid-Tex Gas Division Addition 080.75722 38000 21,421
080 190 - Mid-Tex Gas Division Addition 080.75723 37602 222,920
080 190 - Mid-Tex Gas Division Addition 080.75723 38000 95,537
080 190 - Mid-Tex Gas Division Addition 080.75725 37800 59,921
080 190 - Mid-Tex Gas Division Addition 080.75728 37602 214,134
080 190 - Mid-Tex Gas Division Addition 080.75728 38000 52,873
080 190 - Mid-Tex Gas Division Addition 080.75729 37602 397,998
080 190 - Mid-Tex Gas Division Addition 080.75729 38000 70,235
080 190 - Mid-Tex Gas Division Addition 080.75730 37601 51,188
080 190 - Mid-Tex Gas Division Addition 080.75730 37602 204,750
080 190 - Mid-Tex Gas Division Addition 080.75730 38000 85,313
080 190 - Mid-Tex Gas Division Addition 080.75731 37602 162,371
080 190 - Mid-Tex Gas Division Addition 080.75731 38000 54,124
080 190 - Mid-Tex Gas Division Addition 080.75736 37602 273,056
080 190 - Mid-Tex Gas Division Addition 080.75736 38000 117,024
080 190 - Mid-Tex Gas Division Addition 080.75742 37602 64,687
080 190 - Mid-Tex Gas Division Addition 080.75742 38000 11,415
080 190 - Mid-Tex Gas Division Addition 080.75745 37602 23,449
080 190 - Mid-Tex Gas Division Addition 080.75746 37602 796,557
080 190 - Mid-Tex Gas Division Addition 080.75747 37602 14,369
080 190 - Mid-Tex Gas Division Addition 080.75748 37602 45,060
080 190 - Mid-Tex Gas Division Addition 080.75750 37602 40,169
080 190 - Mid-Tex Gas Division Addition 080.75750 37800 49,096
080 190 - Mid-Tex Gas Division Addition 080.75751 37602 12,922
080 190 - Mid-Tex Gas Division Addition 080.75752 37602 219,535
080 190 - Mid-Tex Gas Division Addition 080.75752 38000 54,884
080 190 - Mid-Tex Gas Division Addition 080.75753 37602 572,829
080 190 - Mid-Tex Gas Division Addition 080.75753 38000 23,868
080 190 - Mid-Tex Gas Division Addition 080.75754 37602 436,081
080 190 - Mid-Tex Gas Division Addition 080.75754 38000 43,129
080 190 - Mid-Tex Gas Division Addition 080.75756 37602 79,991
080 190 - Mid-Tex Gas Division Addition 080.75758 37602 171,135
080 190 - Mid-Tex Gas Division Addition 080.75758 37800 9,508
080 190 - Mid-Tex Gas Division Addition 080.75758 38000 9,508
080 190 - Mid-Tex Gas Division Addition 080.75759 38100 1,411,727
080 190 - Mid-Tex Gas Division Addition 080.75762 37601 70,572
080 190 - Mid-Tex Gas Division Addition 080.75769 37602 200,684
080 190 - Mid-Tex Gas Division Addition 080.75769 38000 32,670
080 190 - Mid-Tex Gas Division Addition 080.75770 37602 237,802
080 190 - Mid-Tex Gas Division Addition 080.75770 38000 237,802
080 190 - Mid-Tex Gas Division Addition 080.75772 37602 16,947
080 190 - Mid-Tex Gas Division Addition 080.75773 37602 9,167
080 190 - Mid-Tex Gas Division Addition 080.75777 37602 186,336
080 190 - Mid-Tex Gas Division Addition 080.75777 38000 32,883
080 190 - Mid-Tex Gas Division Addition 080.75778 37602 9,595
080 190 - Mid-Tex Gas Division Addition 080.75778 38000 -
080 190 - Mid-Tex Gas Division Addition 080.75780 37602 624,058
080 190 - Mid-Tex Gas Division Addition 080.75780 38000 69,340
080 190 - Mid-Tex Gas Division Addition 080.75782 37602 28,135
080 190 - Mid-Tex Gas Division Addition 080.75782 38000 9,379
080 190 - Mid-Tex Gas Division Addition 080.75784 37800 6,183
080 190 - Mid-Tex Gas Division Addition 080.75785 37602 101,606
080 190 - Mid-Tex Gas Division Addition 080.75786 37602 356,921
080 190 - Mid-Tex Gas Division Addition 080.75786 38000 106,613
080 190 - Mid-Tex Gas Division Addition 080.75787 37602 229,206
080 190 - Mid-Tex Gas Division Addition 080.75788 37602 393,431
080 190 - Mid-Tex Gas Division Addition 080.75788 38000 69,429
080 190 - Mid-Tex Gas Division Addition 080.75789 39400 6,295
080 190 - Mid-Tex Gas Division Addition 080.75790 39400 5,621
080 190 - Mid-Tex Gas Division Addition 080.75791 37602 389,339
080 190 - Mid-Tex Gas Division Addition 080.75791 38000 20,492
080 190 - Mid-Tex Gas Division Addition 080.75796 37602 6,186
080 190 - Mid-Tex Gas Division Addition 080.75797 37602 12,496
080 190 - Mid-Tex Gas Division Addition 080.75799 37602 396,975
080 190 - Mid-Tex Gas Division Addition 080.75799 37800 46,703
080 190 - Mid-Tex Gas Division Addition 080.75799 38000 23,352
MTX Additions by FERC
Page 86 of 101
484
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.75801 37602 15,289
080 190 - Mid-Tex Gas Division Addition 080.75803 37602 5,165
080 190 - Mid-Tex Gas Division Addition 080.75804 37600 26,179
080 190 - Mid-Tex Gas Division Addition 080.75805 37602 20,887
080 190 - Mid-Tex Gas Division Addition 080.75806 37602 329,340
080 190 - Mid-Tex Gas Division Addition 080.75806 38000 58,119
080 190 - Mid-Tex Gas Division Addition 080.75807 37602 148,746
080 190 - Mid-Tex Gas Division Addition 080.75807 38000 99,164
080 190 - Mid-Tex Gas Division Addition 080.75808 37602 35,823
080 190 - Mid-Tex Gas Division Addition 080.75812 37602 14,987
080 190 - Mid-Tex Gas Division Addition 080.75813 39400 3,136
080 190 - Mid-Tex Gas Division Addition 080.75814 37602 15,604
080 190 - Mid-Tex Gas Division Addition 080.75815 37602 (1,681)
080 190 - Mid-Tex Gas Division Addition 080.75816 37602 10,688
080 190 - Mid-Tex Gas Division Addition 080.75817 39400 6,295
080 190 - Mid-Tex Gas Division Addition 080.75818 37602 20,664
080 190 - Mid-Tex Gas Division Addition 080.75819 39400 4,807
080 190 - Mid-Tex Gas Division Addition 080.75821 37602 131,785
080 190 - Mid-Tex Gas Division Addition 080.75821 38000 32,946
080 190 - Mid-Tex Gas Division Addition 080.75822 37602 23,639
080 190 - Mid-Tex Gas Division Addition 080.75825 37602 76,108
080 190 - Mid-Tex Gas Division Addition 080.75826 37602 183,457
080 190 - Mid-Tex Gas Division Addition 080.75827 37602 16,017
080 190 - Mid-Tex Gas Division Addition 080.75827 37800 64,066
080 190 - Mid-Tex Gas Division Addition 080.75828 37602 103,194
080 190 - Mid-Tex Gas Division Addition 080.75828 37800 485,617
080 190 - Mid-Tex Gas Division Addition 080.75828 38000 18,211
080 190 - Mid-Tex Gas Division Addition 080.75829 37602 16,674
080 190 - Mid-Tex Gas Division Addition 080.75829 38000 -
080 190 - Mid-Tex Gas Division Addition 080.75830 37602 51,534
080 190 - Mid-Tex Gas Division Addition 080.75830 37800 88,344
080 190 - Mid-Tex Gas Division Addition 080.75830 38000 7,362
080 190 - Mid-Tex Gas Division Addition 080.75833 37602 278,655
080 190 - Mid-Tex Gas Division Addition 080.75833 37800 5,866
080 190 - Mid-Tex Gas Division Addition 080.75833 38000 8,800
080 190 - Mid-Tex Gas Division Addition 080.75842 37602 19,702
080 190 - Mid-Tex Gas Division Addition 080.75845 37602 25,674
080 190 - Mid-Tex Gas Division Addition 080.75847 37602 35,770
080 190 - Mid-Tex Gas Division Addition 080.75852 37602 21,486
080 190 - Mid-Tex Gas Division Addition 080.75854 37602 453,196
080 190 - Mid-Tex Gas Division Addition 080.75856 39000 19,383
080 190 - Mid-Tex Gas Division Addition 080.75857 37602 4,875
080 190 - Mid-Tex Gas Division Addition 080.75858 37602 75,597
080 190 - Mid-Tex Gas Division Addition 080.75859 37602 309,861
080 190 - Mid-Tex Gas Division Addition 080.75859 37800 13,772
080 190 - Mid-Tex Gas Division Addition 080.75859 38000 20,657
080 190 - Mid-Tex Gas Division Addition 080.75860 37602 304,936
080 190 - Mid-Tex Gas Division Addition 080.75860 38000 53,812
080 190 - Mid-Tex Gas Division Addition 080.75863 37602 234,221
080 190 - Mid-Tex Gas Division Addition 080.75863 38000 41,333
080 190 - Mid-Tex Gas Division Addition 080.75864 37602 15,520
080 190 - Mid-Tex Gas Division Addition 080.75867 37602 60,171
080 190 - Mid-Tex Gas Division Addition 080.75870 37602 41,660
080 190 - Mid-Tex Gas Division Addition 080.75870 38000 2,193
080 190 - Mid-Tex Gas Division Addition 080.75875 37602 3,658
080 190 - Mid-Tex Gas Division Addition 080.75876 37602 201,686
080 190 - Mid-Tex Gas Division Addition 080.75878 39000 16,407
080 190 - Mid-Tex Gas Division Addition 080.75883 37602 32,186
080 190 - Mid-Tex Gas Division Addition 080.75883 37800 59,774
080 190 - Mid-Tex Gas Division Addition 080.75887 39004 87,235
080 190 - Mid-Tex Gas Division Addition 080.75890 39906 20,226
080 190 - Mid-Tex Gas Division Addition 080.75894 37602 60,609
080 190 - Mid-Tex Gas Division Addition 080.75900 37602 5,616
080 190 - Mid-Tex Gas Division Addition 080.75901 37602 19,186
080 190 - Mid-Tex Gas Division Addition 080.75907 37602 107,687
080 190 - Mid-Tex Gas Division Addition 080.75908 37602 32,632
080 190 - Mid-Tex Gas Division Addition 080.75908 38000 1,717
080 190 - Mid-Tex Gas Division Addition 080.75909 37602 226,290
080 190 - Mid-Tex Gas Division Addition 080.75909 37800 13,311
080 190 - Mid-Tex Gas Division Addition 080.75909 38000 26,622
080 190 - Mid-Tex Gas Division Addition 080.75910 37602 5,281
080 190 - Mid-Tex Gas Division Addition 080.75911 37602 130,024
080 190 - Mid-Tex Gas Division Addition 080.75915 37601 103,423
080 190 - Mid-Tex Gas Division Addition 080.75917 37602 6,957
080 190 - Mid-Tex Gas Division Addition 080.75918 37602 3,905
080 190 - Mid-Tex Gas Division Addition 080.75919 37602 858,642
080 190 - Mid-Tex Gas Division Addition 080.75919 38000 95,405
080 190 - Mid-Tex Gas Division Addition 080.75921 37602 19,388
080 190 - Mid-Tex Gas Division Addition 080.75922 37602 191,294
080 190 - Mid-Tex Gas Division Addition 080.75924 37602 82,821
080 190 - Mid-Tex Gas Division Addition 080.75924 37800 82,821
080 190 - Mid-Tex Gas Division Addition 080.75924 38000 18,405
080 190 - Mid-Tex Gas Division Addition 080.75925 37602 153,934
080 190 - Mid-Tex Gas Division Addition 080.75925 37800 138,540
080 190 - Mid-Tex Gas Division Addition 080.75925 38000 15,393
080 190 - Mid-Tex Gas Division Addition 080.75932 37602 368,652
080 190 - Mid-Tex Gas Division Addition 080.75932 38000 65,056
080 190 - Mid-Tex Gas Division Addition 080.75933 37602 21,268
080 190 - Mid-Tex Gas Division Addition 080.75933 38000 -
080 190 - Mid-Tex Gas Division Addition 080.75934 39000 14,854
080 190 - Mid-Tex Gas Division Addition 080.75937 37602 1,660
080 190 - Mid-Tex Gas Division Addition 080.75943 39400 6,287
080 190 - Mid-Tex Gas Division Addition 080.75947 37602 12,084
080 190 - Mid-Tex Gas Division Addition 080.75948 37602 2,703
080 190 - Mid-Tex Gas Division Addition 080.75950 37602 13,215
080 190 - Mid-Tex Gas Division Addition 080.75954 37602 11,966
080 190 - Mid-Tex Gas Division Addition 080.75955 39906 47,078
080 190 - Mid-Tex Gas Division Addition 080.75958 37602 99,132
080 190 - Mid-Tex Gas Division Addition 080.75964 37602 336,581
080 190 - Mid-Tex Gas Division Addition 080.75965 37602 64,116
080 190 - Mid-Tex Gas Division Addition 080.75966 37602 197,646
080 190 - Mid-Tex Gas Division Addition 080.75966 38000 197,646
080 190 - Mid-Tex Gas Division Addition 080.75967 37602 232,918
080 190 - Mid-Tex Gas Division Addition 080.75967 38000 25,880
080 190 - Mid-Tex Gas Division Addition 080.75968 37602 710,338
080 190 - Mid-Tex Gas Division Addition 080.75968 38000 262,728
080 190 - Mid-Tex Gas Division Addition 080.75972 37601 134,994
MTX Additions by FERC
Page 87 of 101
485
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.75972 37602 231,418
080 190 - Mid-Tex Gas Division Addition 080.75972 38000 19,285
080 190 - Mid-Tex Gas Division Addition 080.75973 39906 167,490
080 190 - Mid-Tex Gas Division Addition 080.75975 37602 68,526
080 190 - Mid-Tex Gas Division Addition 080.75975 38000 3,607
080 190 - Mid-Tex Gas Division Addition 080.75976 37602 118,292
080 190 - Mid-Tex Gas Division Addition 080.75976 38000 6,226
080 190 - Mid-Tex Gas Division Addition 080.75978 37602 25,709
080 190 - Mid-Tex Gas Division Addition 080.75979 37800 74,852
080 190 - Mid-Tex Gas Division Addition 080.75984 39906 253,299
080 190 - Mid-Tex Gas Division Addition 080.75987 37601 126,332
080 190 - Mid-Tex Gas Division Addition 080.75990 37602 86,256
080 190 - Mid-Tex Gas Division Addition 080.75991 39400 5,674
080 190 - Mid-Tex Gas Division Addition 080.75992 39906 286,632
080 190 - Mid-Tex Gas Division Addition 080.75994 37602 77,628
080 190 - Mid-Tex Gas Division Addition 080.75994 37800 54,476
080 190 - Mid-Tex Gas Division Addition 080.75994 38000 4,086
080 190 - Mid-Tex Gas Division Addition 080.75996 37600 68,467
080 190 - Mid-Tex Gas Division Addition 080.76001 37602 436,562
080 190 - Mid-Tex Gas Division Addition 080.76004 37602 69,183
080 190 - Mid-Tex Gas Division Addition 080.76005 39400 5,147
080 190 - Mid-Tex Gas Division Addition 080.76009 37602 1,727
080 190 - Mid-Tex Gas Division Addition 080.76012 37602 139,164
080 190 - Mid-Tex Gas Division Addition 080.76012 38000 15,463
080 190 - Mid-Tex Gas Division Addition 080.76013 37602 581,907
080 190 - Mid-Tex Gas Division Addition 080.76014 39906 43,774
080 190 - Mid-Tex Gas Division Addition 080.76018 37602 68,321
080 190 - Mid-Tex Gas Division Addition 080.76019 37602 23,765
080 190 - Mid-Tex Gas Division Addition 080.76024 37602 91,666
080 190 - Mid-Tex Gas Division Addition 080.76024 37800 30,556
080 190 - Mid-Tex Gas Division Addition 080.76025 37601 13,294
080 190 - Mid-Tex Gas Division Addition 080.76025 37602 39,883
080 190 - Mid-Tex Gas Division Addition 080.76025 37800 79,765
080 190 - Mid-Tex Gas Division Addition 080.76026 37602 98,884
080 190 - Mid-Tex Gas Division Addition 080.76026 38000 3,058
080 190 - Mid-Tex Gas Division Addition 080.76027 37602 785,967
080 190 - Mid-Tex Gas Division Addition 080.76027 38000 87,330
080 190 - Mid-Tex Gas Division Addition 080.76028 37602 171,471
080 190 - Mid-Tex Gas Division Addition 080.76029 37602 1,381
080 190 - Mid-Tex Gas Division Addition 080.76032 37602 24,548
080 190 - Mid-Tex Gas Division Addition 080.76033 37602 317
080 190 - Mid-Tex Gas Division Addition 080.76039 37602 610,111
080 190 - Mid-Tex Gas Division Addition 080.76039 38000 406,741
080 190 - Mid-Tex Gas Division Addition 080.76044 37602 4,696
080 190 - Mid-Tex Gas Division Addition 080.76045 37602 5,854
080 190 - Mid-Tex Gas Division Addition 080.76047 37602 97,399
080 190 - Mid-Tex Gas Division Addition 080.76047 38000 -
080 190 - Mid-Tex Gas Division Addition 080.76052 37602 285,550
080 190 - Mid-Tex Gas Division Addition 080.76055 37602 9,437
080 190 - Mid-Tex Gas Division Addition 080.76056 37602 194,315
080 190 - Mid-Tex Gas Division Addition 080.76064 37602 471,842
080 190 - Mid-Tex Gas Division Addition 080.76065 37602 31,406
080 190 - Mid-Tex Gas Division Addition 080.76065 38100 886
080 190 - Mid-Tex Gas Division Addition 080.76066 37602 303,431
080 190 - Mid-Tex Gas Division Addition 080.76076 37602 22,924
080 190 - Mid-Tex Gas Division Addition 080.76085 37602 224,191
080 190 - Mid-Tex Gas Division Addition 080.76085 38000 56,048
080 190 - Mid-Tex Gas Division Addition 080.76087 37602 38,805
080 190 - Mid-Tex Gas Division Addition 080.76087 37800 47,428
080 190 - Mid-Tex Gas Division Addition 080.76088 37602 92,234
080 190 - Mid-Tex Gas Division Addition 080.76088 37800 199,840
080 190 - Mid-Tex Gas Division Addition 080.76088 38000 15,372
080 190 - Mid-Tex Gas Division Addition 080.76089 37602 47,853
080 190 - Mid-Tex Gas Division Addition 080.76089 37800 71,780
080 190 - Mid-Tex Gas Division Addition 080.76093 37602 564,293
080 190 - Mid-Tex Gas Division Addition 080.76093 38000 141,073
080 190 - Mid-Tex Gas Division Addition 080.76098 37602 963,380
080 190 - Mid-Tex Gas Division Addition 080.76098 38000 107,042
080 190 - Mid-Tex Gas Division Addition 080.76101 37601 12,140
080 190 - Mid-Tex Gas Division Addition 080.76101 37602 48,561
080 190 - Mid-Tex Gas Division Addition 080.76101 37800 60,702
080 190 - Mid-Tex Gas Division Addition 080.76107 37601 141,952
080 190 - Mid-Tex Gas Division Addition 080.76107 37602 101,395
080 190 - Mid-Tex Gas Division Addition 080.76107 37800 162,231
080 190 - Mid-Tex Gas Division Addition 080.76108 37602 34,798
080 190 - Mid-Tex Gas Division Addition 080.76109 37602 303,859
080 190 - Mid-Tex Gas Division Addition 080.76110 37601 338,587
080 190 - Mid-Tex Gas Division Addition 080.76111 37602 96,576
080 190 - Mid-Tex Gas Division Addition 080.76111 38000 32,192
080 190 - Mid-Tex Gas Division Addition 080.76120 37601 12,576
080 190 - Mid-Tex Gas Division Addition 080.76120 37602 37,728
080 190 - Mid-Tex Gas Division Addition 080.76120 37800 75,455
080 190 - Mid-Tex Gas Division Addition 080.76121 37602 56,040
080 190 - Mid-Tex Gas Division Addition 080.76121 38000 5,903
080 190 - Mid-Tex Gas Division Addition 080.76122 37602 96,214
080 190 - Mid-Tex Gas Division Addition 080.76122 38000 10,691
080 190 - Mid-Tex Gas Division Addition 080.76124 39906 3,096
080 190 - Mid-Tex Gas Division Addition 080.76129 37602 18,849
080 190 - Mid-Tex Gas Division Addition 080.76129 38000 1
080 190 - Mid-Tex Gas Division Addition 080.76132 37602 353,539
080 190 - Mid-Tex Gas Division Addition 080.76138 37602 55,009
080 190 - Mid-Tex Gas Division Addition 080.76138 37800 67,236
080 190 - Mid-Tex Gas Division Addition 080.76140 37601 17,397
080 190 - Mid-Tex Gas Division Addition 080.76140 37602 46,391
080 190 - Mid-Tex Gas Division Addition 080.76140 37800 51,801
080 190 - Mid-Tex Gas Division Addition 080.76141 37602 341,595
080 190 - Mid-Tex Gas Division Addition 080.76141 38000 183,936
080 190 - Mid-Tex Gas Division Addition 080.76143 37602 717,998
080 190 - Mid-Tex Gas Division Addition 080.76143 38000 126,706
080 190 - Mid-Tex Gas Division Addition 080.76144 37602 5,509
080 190 - Mid-Tex Gas Division Addition 080.76144 38000 290
080 190 - Mid-Tex Gas Division Addition 080.76145 37602 364,836
080 190 - Mid-Tex Gas Division Addition 080.76149 37602 290,222
080 190 - Mid-Tex Gas Division Addition 080.76149 38000 156,274
080 190 - Mid-Tex Gas Division Addition 080.76150 37602 172,424
080 190 - Mid-Tex Gas Division Addition 080.76150 38000 9,075
080 190 - Mid-Tex Gas Division Addition 080.76151 37602 394,499
MTX Additions by FERC
Page 88 of 101
486
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.76151 38000 20,763
080 190 - Mid-Tex Gas Division Addition 080.76154 37602 20,384
080 190 - Mid-Tex Gas Division Addition 080.76160 37800 23,050
080 190 - Mid-Tex Gas Division Addition 080.76161 37602 52,332
080 190 - Mid-Tex Gas Division Addition 080.76161 38000 22,428
080 190 - Mid-Tex Gas Division Addition 080.76166 37602 99,244
080 190 - Mid-Tex Gas Division Addition 080.76166 38000 11,027
080 190 - Mid-Tex Gas Division Addition 080.76168 39906 128,693
080 190 - Mid-Tex Gas Division Addition 080.76173 37602 15,719
080 190 - Mid-Tex Gas Division Addition 080.76174 39400 5,006
080 190 - Mid-Tex Gas Division Addition 080.76176 37602 8,595
080 190 - Mid-Tex Gas Division Addition 080.76176 38000 1
080 190 - Mid-Tex Gas Division Addition 080.76178 37602 2,340
080 190 - Mid-Tex Gas Division Addition 080.76179 39903 1,526
080 190 - Mid-Tex Gas Division Addition 080.76180 39906 283,910
080 190 - Mid-Tex Gas Division Addition 080.76182 37602 3,874
080 190 - Mid-Tex Gas Division Addition 080.76182 38000 39
080 190 - Mid-Tex Gas Division Addition 080.76183 39906 101,145
080 190 - Mid-Tex Gas Division Addition 080.76187 37602 341,515
080 190 - Mid-Tex Gas Division Addition 080.76189 37602 38,966
080 190 - Mid-Tex Gas Division Addition 080.76192 37602 51,313
080 190 - Mid-Tex Gas Division Addition 080.76192 37800 87,965
080 190 - Mid-Tex Gas Division Addition 080.76192 38000 7,330
080 190 - Mid-Tex Gas Division Addition 080.76194 37602 74,142
080 190 - Mid-Tex Gas Division Addition 080.76194 38000 1
080 190 - Mid-Tex Gas Division Addition 080.76198 37602 593,794
080 190 - Mid-Tex Gas Division Addition 080.76198 38000 18,365
080 190 - Mid-Tex Gas Division Addition 080.76199 37602 455,324
080 190 - Mid-Tex Gas Division Addition 080.76199 38000 14,082
080 190 - Mid-Tex Gas Division Addition 080.76200 37602 370,949
080 190 - Mid-Tex Gas Division Addition 080.76200 38000 16,263
080 190 - Mid-Tex Gas Division Addition 080.76201 37602 287,830
080 190 - Mid-Tex Gas Division Addition 080.76201 38000 71,958
080 190 - Mid-Tex Gas Division Addition 080.76202 37602 443,901
080 190 - Mid-Tex Gas Division Addition 080.76202 38000 17,055
080 190 - Mid-Tex Gas Division Addition 080.76205 37602 205,242
080 190 - Mid-Tex Gas Division Addition 080.76210 37602 10,458
080 190 - Mid-Tex Gas Division Addition 080.76216 37602 757,218
080 190 - Mid-Tex Gas Division Addition 080.76217 37602 421,500
080 190 - Mid-Tex Gas Division Addition 080.76217 38000 105,375
080 190 - Mid-Tex Gas Division Addition 080.76230 37602 14,291
080 190 - Mid-Tex Gas Division Addition 080.76234 37602 6,346
080 190 - Mid-Tex Gas Division Addition 080.76235 39400 1,621
080 190 - Mid-Tex Gas Division Addition 080.76242 39000 19,681
080 190 - Mid-Tex Gas Division Addition 080.76243 37602 3,855
080 190 - Mid-Tex Gas Division Addition 080.76248 37800 16,073
080 190 - Mid-Tex Gas Division Addition 080.76249 37602 21,955
080 190 - Mid-Tex Gas Division Addition 080.76250 37602 646,229
080 190 - Mid-Tex Gas Division Addition 080.76250 38000 114,040
080 190 - Mid-Tex Gas Division Addition 080.76252 37602 248,138
080 190 - Mid-Tex Gas Division Addition 080.76256 37602 206,857
080 190 - Mid-Tex Gas Division Addition 080.76256 38000 22,984
080 190 - Mid-Tex Gas Division Addition 080.76258 37602 130,172
080 190 - Mid-Tex Gas Division Addition 080.76259 37602 53,401
080 190 - Mid-Tex Gas Division Addition 080.76259 38000 539
080 190 - Mid-Tex Gas Division Addition 080.76260 37602 251,251
080 190 - Mid-Tex Gas Division Addition 080.76260 38000 44,338
080 190 - Mid-Tex Gas Division Addition 080.76262 37602 148,476
080 190 - Mid-Tex Gas Division Addition 080.76262 38000 63,633
080 190 - Mid-Tex Gas Division Addition 080.76263 37602 222,704
080 190 - Mid-Tex Gas Division Addition 080.76263 38000 55,676
080 190 - Mid-Tex Gas Division Addition 080.76264 37602 287,769
080 190 - Mid-Tex Gas Division Addition 080.76264 38000 67,710
080 190 - Mid-Tex Gas Division Addition 080.76265 37602 232,076
080 190 - Mid-Tex Gas Division Addition 080.76265 38000 99,461
080 190 - Mid-Tex Gas Division Addition 080.76266 37602 387,994
080 190 - Mid-Tex Gas Division Addition 080.76266 38000 43,111
080 190 - Mid-Tex Gas Division Addition 080.76267 37602 199,583
080 190 - Mid-Tex Gas Division Addition 080.76267 38000 35,221
080 190 - Mid-Tex Gas Division Addition 080.76268 37602 170,456
080 190 - Mid-Tex Gas Division Addition 080.76268 38000 30,080
080 190 - Mid-Tex Gas Division Addition 080.76269 37602 126,780
080 190 - Mid-Tex Gas Division Addition 080.76269 38000 68,266
080 190 - Mid-Tex Gas Division Addition 080.76270 37602 215,362
080 190 - Mid-Tex Gas Division Addition 080.76270 38000 38,005
080 190 - Mid-Tex Gas Division Addition 080.76293 37602 75,466
080 190 - Mid-Tex Gas Division Addition 080.76315 37602 816,741
080 190 - Mid-Tex Gas Division Addition 080.76330 37602 233,069
080 190 - Mid-Tex Gas Division Addition 080.76330 38000 25,897
080 190 - Mid-Tex Gas Division Addition 080.76332 37602 478,026
080 190 - Mid-Tex Gas Division Addition 080.76332 38000 95,605
080 190 - Mid-Tex Gas Division Addition 080.76335 37602 913,667
080 190 - Mid-Tex Gas Division Addition 080.76335 38000 161,235
080 190 - Mid-Tex Gas Division Addition 080.76338 37602 595,479
080 190 - Mid-Tex Gas Division Addition 080.76338 38000 148,870
080 190 - Mid-Tex Gas Division Addition 080.76339 37602 229,832
080 190 - Mid-Tex Gas Division Addition 080.76339 38000 45,966
080 190 - Mid-Tex Gas Division Addition 080.76343 37602 282,998
080 190 - Mid-Tex Gas Division Addition 080.76343 38000 70,750
080 190 - Mid-Tex Gas Division Addition 080.76346 37602 180,146
080 190 - Mid-Tex Gas Division Addition 080.76346 38000 45,037
080 190 - Mid-Tex Gas Division Addition 080.76347 37602 172,639
080 190 - Mid-Tex Gas Division Addition 080.76347 38000 43,160
080 190 - Mid-Tex Gas Division Addition 080.76349 37602 347,508
080 190 - Mid-Tex Gas Division Addition 080.76349 38000 86,877
080 190 - Mid-Tex Gas Division Addition 080.76350 37602 196,616
080 190 - Mid-Tex Gas Division Addition 080.76350 38000 10,348
080 190 - Mid-Tex Gas Division Addition 080.76352 37602 35,064
080 190 - Mid-Tex Gas Division Addition 080.76353 39000 17,684
080 190 - Mid-Tex Gas Division Addition 080.76354 37602 347,932
080 190 - Mid-Tex Gas Division Addition 080.76354 38000 18,312
080 190 - Mid-Tex Gas Division Addition 080.76355 39906 11,564
080 190 - Mid-Tex Gas Division Addition 080.76356 37602 375,281
080 190 - Mid-Tex Gas Division Addition 080.76356 38000 61,092
080 190 - Mid-Tex Gas Division Addition 080.76358 37602 6,701
080 190 - Mid-Tex Gas Division Addition 080.76359 37602 4,099
080 190 - Mid-Tex Gas Division Addition 080.76360 37602 53,683
MTX Additions by FERC
Page 89 of 101
487
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.76364 37602 (1,880)
080 190 - Mid-Tex Gas Division Addition 080.76366 37602 389,033
080 190 - Mid-Tex Gas Division Addition 080.76368 37602 11,946
080 190 - Mid-Tex Gas Division Addition 080.76370 37601 71,044
080 190 - Mid-Tex Gas Division Addition 080.76371 37602 295,418
080 190 - Mid-Tex Gas Division Addition 080.76371 38000 -
080 190 - Mid-Tex Gas Division Addition 080.76375 37601 17,033
080 190 - Mid-Tex Gas Division Addition 080.76375 37602 44,905
080 190 - Mid-Tex Gas Division Addition 080.76375 37800 92,906
080 190 - Mid-Tex Gas Division Addition 080.76376 38000 740,192
080 190 - Mid-Tex Gas Division Addition 080.76378 37602 54,190
080 190 - Mid-Tex Gas Division Addition 080.76378 38000 2,852
080 190 - Mid-Tex Gas Division Addition 080.76379 37602 544,078
080 190 - Mid-Tex Gas Division Addition 080.76379 38000 233,176
080 190 - Mid-Tex Gas Division Addition 080.76380 37602 4,245
080 190 - Mid-Tex Gas Division Addition 080.76382 37602 356,552
080 190 - Mid-Tex Gas Division Addition 080.76382 38000 3,602
080 190 - Mid-Tex Gas Division Addition 080.76385 39400 1,486
080 190 - Mid-Tex Gas Division Addition 080.76390 37602 491,705
080 190 - Mid-Tex Gas Division Addition 080.76390 38000 327,804
080 190 - Mid-Tex Gas Division Addition 080.76392 39906 2,395
080 190 - Mid-Tex Gas Division Addition 080.76394 37602 40,437
080 190 - Mid-Tex Gas Division Addition 080.76398 37602 3,595
080 190 - Mid-Tex Gas Division Addition 080.76402 37602 275,676
080 190 - Mid-Tex Gas Division Addition 080.76402 38000 68,919
080 190 - Mid-Tex Gas Division Addition 080.76405 37602 2,097
080 190 - Mid-Tex Gas Division Addition 080.76407 37602 15,867
080 190 - Mid-Tex Gas Division Addition 080.76408 37602 31,141
080 190 - Mid-Tex Gas Division Addition 080.76419 37602 206,274
080 190 - Mid-Tex Gas Division Addition 080.76419 38000 88,403
080 190 - Mid-Tex Gas Division Addition 080.76420 37602 294,441
080 190 - Mid-Tex Gas Division Addition 080.76420 38000 98,147
080 190 - Mid-Tex Gas Division Addition 080.76421 37602 154,374
080 190 - Mid-Tex Gas Division Addition 080.76421 38000 66,160
080 190 - Mid-Tex Gas Division Addition 080.76422 37602 131,080
080 190 - Mid-Tex Gas Division Addition 080.76422 38000 14,564
080 190 - Mid-Tex Gas Division Addition 080.76423 39906 82,925
080 190 - Mid-Tex Gas Division Addition 080.76425 37602 285,423
080 190 - Mid-Tex Gas Division Addition 080.76425 38000 71,356
080 190 - Mid-Tex Gas Division Addition 080.76426 37602 180,283
080 190 - Mid-Tex Gas Division Addition 080.76426 38000 60,094
080 190 - Mid-Tex Gas Division Addition 080.76427 37602 7,653
080 190 - Mid-Tex Gas Division Addition 080.76427 38000 -
080 190 - Mid-Tex Gas Division Addition 080.76428 37602 83,589
080 190 - Mid-Tex Gas Division Addition 080.76428 38000 55,726
080 190 - Mid-Tex Gas Division Addition 080.76429 37602 142,389
080 190 - Mid-Tex Gas Division Addition 080.76429 38000 25,127
080 190 - Mid-Tex Gas Division Addition 080.76430 37602 317,127
080 190 - Mid-Tex Gas Division Addition 080.76430 38000 105,709
080 190 - Mid-Tex Gas Division Addition 080.76431 37602 164,232
080 190 - Mid-Tex Gas Division Addition 080.76431 38000 88,432
080 190 - Mid-Tex Gas Division Addition 080.76433 37602 9,165
080 190 - Mid-Tex Gas Division Addition 080.76434 37601 29,049
080 190 - Mid-Tex Gas Division Addition 080.76434 37602 58,098
080 190 - Mid-Tex Gas Division Addition 080.76434 37800 58,098
080 190 - Mid-Tex Gas Division Addition 080.76435 39903 340,855
080 190 - Mid-Tex Gas Division Addition 080.76440 37602 217
080 190 - Mid-Tex Gas Division Addition 080.76448 39000 3,119
080 190 - Mid-Tex Gas Division Addition 080.76451 37602 428,747
080 190 - Mid-Tex Gas Division Addition 080.76451 38000 107,187
080 190 - Mid-Tex Gas Division Addition 080.76458 37602 712,363
080 190 - Mid-Tex Gas Division Addition 080.76460 37602 22,329
080 190 - Mid-Tex Gas Division Addition 080.76461 37602 401,402
080 190 - Mid-Tex Gas Division Addition 080.76461 38000 267,601
080 190 - Mid-Tex Gas Division Addition 080.76462 37602 29,539
080 190 - Mid-Tex Gas Division Addition 080.76468 37602 55,291
080 190 - Mid-Tex Gas Division Addition 080.76468 38000 2,910
080 190 - Mid-Tex Gas Division Addition 080.76469 37602 513,850
080 190 - Mid-Tex Gas Division Addition 080.76470 37602 23,266
080 190 - Mid-Tex Gas Division Addition 080.76472 37602 273,279
080 190 - Mid-Tex Gas Division Addition 080.76473 37602 117,924
080 190 - Mid-Tex Gas Division Addition 080.76473 37800 117,924
080 190 - Mid-Tex Gas Division Addition 080.76473 38000 26,205
080 190 - Mid-Tex Gas Division Addition 080.76478 37602 6,006
080 190 - Mid-Tex Gas Division Addition 080.76481 37602 47,848
080 190 - Mid-Tex Gas Division Addition 080.76481 38000 5,316
080 190 - Mid-Tex Gas Division Addition 080.76482 37602 283,826
080 190 - Mid-Tex Gas Division Addition 080.76483 37602 117,156
080 190 - Mid-Tex Gas Division Addition 080.76483 38000 13,017
080 190 - Mid-Tex Gas Division Addition 080.76490 37602 243,645
080 190 - Mid-Tex Gas Division Addition 080.76491 37600 70,976
080 190 - Mid-Tex Gas Division Addition 080.76492 37602 102,091
080 190 - Mid-Tex Gas Division Addition 080.76496 37602 274,154
080 190 - Mid-Tex Gas Division Addition 080.76496 38000 30,462
080 190 - Mid-Tex Gas Division Addition 080.76498 37602 501,436
080 190 - Mid-Tex Gas Division Addition 080.76498 38000 55,715
080 190 - Mid-Tex Gas Division Addition 080.76501 39000 12,862
080 190 - Mid-Tex Gas Division Addition 080.76504 37602 (16,386)
080 190 - Mid-Tex Gas Division Addition 080.76504 38000 (684)
080 190 - Mid-Tex Gas Division Addition 080.76508 37602 178,087
080 190 - Mid-Tex Gas Division Addition 080.76509 37602 80,465
080 190 - Mid-Tex Gas Division Addition 080.76509 38000 34,485
080 190 - Mid-Tex Gas Division Addition 080.76510 37602 381,541
080 190 - Mid-Tex Gas Division Addition 080.76510 38000 53,416
080 190 - Mid-Tex Gas Division Addition 080.76511 37602 500,128
080 190 - Mid-Tex Gas Division Addition 080.76513 37602 564,924
080 190 - Mid-Tex Gas Division Addition 080.76513 38000 62,769
080 190 - Mid-Tex Gas Division Addition 080.76514 37602 520,141
080 190 - Mid-Tex Gas Division Addition 080.76515 37602 375,999
080 190 - Mid-Tex Gas Division Addition 080.76515 38000 41,778
080 190 - Mid-Tex Gas Division Addition 080.76516 37601 47,354
080 190 - Mid-Tex Gas Division Addition 080.76516 37602 402,513
080 190 - Mid-Tex Gas Division Addition 080.76516 38000 23,677
080 190 - Mid-Tex Gas Division Addition 080.76519 37602 4,952
080 190 - Mid-Tex Gas Division Addition 080.76521 37602 132,753
080 190 - Mid-Tex Gas Division Addition 080.76522 37602 495,438
080 190 - Mid-Tex Gas Division Addition 080.76522 38000 26,076
MTX Additions by FERC
Page 90 of 101
488
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.76523 37601 24,632
080 190 - Mid-Tex Gas Division Addition 080.76524 37602 194,238
080 190 - Mid-Tex Gas Division Addition 080.76525 37602 43,535
080 190 - Mid-Tex Gas Division Addition 080.76526 37602 95,516
080 190 - Mid-Tex Gas Division Addition 080.76527 37602 207,912
080 190 - Mid-Tex Gas Division Addition 080.76532 37602 91,086
080 190 - Mid-Tex Gas Division Addition 080.76535 37602 23,742
080 190 - Mid-Tex Gas Division Addition 080.76538 37602 494,919
080 190 - Mid-Tex Gas Division Addition 080.76538 38000 15,307
080 190 - Mid-Tex Gas Division Addition 080.76544 39400 350,349
080 190 - Mid-Tex Gas Division Addition 080.76550 37602 55,957
080 190 - Mid-Tex Gas Division Addition 080.76554 37602 56,762
080 190 - Mid-Tex Gas Division Addition 080.76555 37602 172,838
080 190 - Mid-Tex Gas Division Addition 080.76556 37602 465,372
080 190 - Mid-Tex Gas Division Addition 080.76556 38000 4,701
080 190 - Mid-Tex Gas Division Addition 080.76557 37602 233,736
080 190 - Mid-Tex Gas Division Addition 080.76557 38000 12,302
080 190 - Mid-Tex Gas Division Addition 080.76560 37602 28,632
080 190 - Mid-Tex Gas Division Addition 080.76562 37602 88,564
080 190 - Mid-Tex Gas Division Addition 080.76571 37601 85,706
080 190 - Mid-Tex Gas Division Addition 080.76571 37800 74,527
080 190 - Mid-Tex Gas Division Addition 080.76574 37602 401,719
080 190 - Mid-Tex Gas Division Addition 080.76575 37602 251,133
080 190 - Mid-Tex Gas Division Addition 080.76575 38000 44,318
080 190 - Mid-Tex Gas Division Addition 080.76577 39906 3,294
080 190 - Mid-Tex Gas Division Addition 080.76580 37602 81,002
080 190 - Mid-Tex Gas Division Addition 080.76580 37800 81,002
080 190 - Mid-Tex Gas Division Addition 080.76581 37602 46,269
080 190 - Mid-Tex Gas Division Addition 080.76582 37602 396,789
080 190 - Mid-Tex Gas Division Addition 080.76587 37602 962,958
080 190 - Mid-Tex Gas Division Addition 080.76588 37602 23,468
080 190 - Mid-Tex Gas Division Addition 080.76589 37602 165,811
080 190 - Mid-Tex Gas Division Addition 080.76590 37602 129,533
080 190 - Mid-Tex Gas Division Addition 080.76590 38000 14,393
080 190 - Mid-Tex Gas Division Addition 080.76591 37602 307,852
080 190 - Mid-Tex Gas Division Addition 080.76591 37800 16,203
080 190 - Mid-Tex Gas Division Addition 080.76592 37602 17,948
080 190 - Mid-Tex Gas Division Addition 080.76612 37602 9,034
080 190 - Mid-Tex Gas Division Addition 080.76615 37602 16,271
080 190 - Mid-Tex Gas Division Addition 080.76615 37800 0
080 190 - Mid-Tex Gas Division Addition 080.76615 38000 714
080 190 - Mid-Tex Gas Division Addition 080.76621 39903 28,822
080 190 - Mid-Tex Gas Division Addition 080.76624 37602 4,887
080 190 - Mid-Tex Gas Division Addition 080.76627 39000 5,205
080 190 - Mid-Tex Gas Division Addition 080.76628 37602 372,463
080 190 - Mid-Tex Gas Division Addition 080.76628 38000 93,116
080 190 - Mid-Tex Gas Division Addition 080.76629 37602 6,866
080 190 - Mid-Tex Gas Division Addition 080.76633 37602 1,503
080 190 - Mid-Tex Gas Division Addition 080.76635 39400 606,708
080 190 - Mid-Tex Gas Division Addition 080.76638 37602 18,433
080 190 - Mid-Tex Gas Division Addition 080.76638 37800 64,514
080 190 - Mid-Tex Gas Division Addition 080.76638 38500 9,216
080 190 - Mid-Tex Gas Division Addition 080.76641 37500 5,053
080 190 - Mid-Tex Gas Division Addition 080.76644 37602 824,154
080 190 - Mid-Tex Gas Division Addition 080.76644 38000 206,039
080 190 - Mid-Tex Gas Division Addition 080.76650 37602 267,966
080 190 - Mid-Tex Gas Division Addition 080.76650 38000 14,103
080 190 - Mid-Tex Gas Division Addition 080.76653 37602 46,262
080 190 - Mid-Tex Gas Division Addition 080.76655 37602 136,092
080 190 - Mid-Tex Gas Division Addition 080.76655 38000 5,229
080 190 - Mid-Tex Gas Division Addition 080.76656 37602 1,735
080 190 - Mid-Tex Gas Division Addition 080.76657 37602 303,727
080 190 - Mid-Tex Gas Division Addition 080.76657 38000 303,727
080 190 - Mid-Tex Gas Division Addition 080.76658 37602 47,091
080 190 - Mid-Tex Gas Division Addition 080.76659 37602 621,350
080 190 - Mid-Tex Gas Division Addition 080.76660 37602 599,734
080 190 - Mid-Tex Gas Division Addition 080.76660 38000 199,911
080 190 - Mid-Tex Gas Division Addition 080.76661 37602 247,654
080 190 - Mid-Tex Gas Division Addition 080.76661 38000 27,517
080 190 - Mid-Tex Gas Division Addition 080.76662 37602 54,998
080 190 - Mid-Tex Gas Division Addition 080.76662 37800 82,498
080 190 - Mid-Tex Gas Division Addition 080.76664 37602 4,895
080 190 - Mid-Tex Gas Division Addition 080.76666 37602 147,405
080 190 - Mid-Tex Gas Division Addition 080.76666 38000 98,270
080 190 - Mid-Tex Gas Division Addition 080.76672 37602 50,757
080 190 - Mid-Tex Gas Division Addition 080.76672 37800 62,036
080 190 - Mid-Tex Gas Division Addition 080.76673 37602 53,578
080 190 - Mid-Tex Gas Division Addition 080.76673 37800 73,670
080 190 - Mid-Tex Gas Division Addition 080.76673 38000 6,697
080 190 - Mid-Tex Gas Division Addition 080.76680 37602 46,048
080 190 - Mid-Tex Gas Division Addition 080.76680 37800 69,072
080 190 - Mid-Tex Gas Division Addition 080.76681 37602 72,046
080 190 - Mid-Tex Gas Division Addition 080.76681 37800 108,069
080 190 - Mid-Tex Gas Division Addition 080.76682 37602 402,011
080 190 - Mid-Tex Gas Division Addition 080.76682 38000 156,338
080 190 - Mid-Tex Gas Division Addition 080.76684 37602 82,765
080 190 - Mid-Tex Gas Division Addition 080.76684 37800 113,802
080 190 - Mid-Tex Gas Division Addition 080.76684 38000 10,346
080 190 - Mid-Tex Gas Division Addition 080.76686 37602 149,555
080 190 - Mid-Tex Gas Division Addition 080.76686 37800 64,095
080 190 - Mid-Tex Gas Division Addition 080.76687 37602 37,697
080 190 - Mid-Tex Gas Division Addition 080.76688 37602 15,421
080 190 - Mid-Tex Gas Division Addition 080.76694 38500 20,994
080 190 - Mid-Tex Gas Division Addition 080.76695 37800 193,657
080 190 - Mid-Tex Gas Division Addition 080.76697 37800 554,977
080 190 - Mid-Tex Gas Division Addition 080.76698 37602 3,189
080 190 - Mid-Tex Gas Division Addition 080.76703 39000 751,207
080 190 - Mid-Tex Gas Division Addition 080.76703 39800 39,537
080 190 - Mid-Tex Gas Division Addition 080.76713 37602 372,216
080 190 - Mid-Tex Gas Division Addition 080.76713 38000 41,357
080 190 - Mid-Tex Gas Division Addition 080.76714 38100 58,525
080 190 - Mid-Tex Gas Division Addition 080.76724 37602 63,558
080 190 - Mid-Tex Gas Division Addition 080.76728 37602 13,684
080 190 - Mid-Tex Gas Division Addition 080.76731 37602 370,233
080 190 - Mid-Tex Gas Division Addition 080.76731 38000 158,671
080 190 - Mid-Tex Gas Division Addition 080.76735 37602 37,803
080 190 - Mid-Tex Gas Division Addition 080.76737 37602 144,273
MTX Additions by FERC
Page 91 of 101
489
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.76738 37602 49,148
080 190 - Mid-Tex Gas Division Addition 080.76738 38000 2,587
080 190 - Mid-Tex Gas Division Addition 080.76752 37602 63,303
080 190 - Mid-Tex Gas Division Addition 080.76754 37602 219,098
080 190 - Mid-Tex Gas Division Addition 080.76763 37602 79,161
080 190 - Mid-Tex Gas Division Addition 080.76765 37602 21,612
080 190 - Mid-Tex Gas Division Addition 080.76765 38000 0
080 190 - Mid-Tex Gas Division Addition 080.76771 37602 35,723
080 190 - Mid-Tex Gas Division Addition 080.76771 38000 1,880
080 190 - Mid-Tex Gas Division Addition 080.76773 37601 285,352
080 190 - Mid-Tex Gas Division Addition 080.76773 37602 203,823
080 190 - Mid-Tex Gas Division Addition 080.76773 37800 326,116
080 190 - Mid-Tex Gas Division Addition 080.76776 37602 (5,609)
080 190 - Mid-Tex Gas Division Addition 080.76778 37602 100,630
080 190 - Mid-Tex Gas Division Addition 080.76780 38500 50,505
080 190 - Mid-Tex Gas Division Addition 080.76782 37602 114,824
080 190 - Mid-Tex Gas Division Addition 080.76782 38000 6,043
080 190 - Mid-Tex Gas Division Addition 080.76783 37602 9,119
080 190 - Mid-Tex Gas Division Addition 080.76783 38000 480
080 190 - Mid-Tex Gas Division Addition 080.76788 37602 24,697
080 190 - Mid-Tex Gas Division Addition 080.76793 37602 42,366
080 190 - Mid-Tex Gas Division Addition 080.76793 38000 2,230
080 190 - Mid-Tex Gas Division Addition 080.76794 37602 42,881
080 190 - Mid-Tex Gas Division Addition 080.76794 38000 -
080 190 - Mid-Tex Gas Division Addition 080.76799 37602 447,840
080 190 - Mid-Tex Gas Division Addition 080.76799 38000 241,145
080 190 - Mid-Tex Gas Division Addition 080.76806 37602 23,493
080 190 - Mid-Tex Gas Division Addition 080.76806 38000 3,535
080 190 - Mid-Tex Gas Division Addition 080.76808 37602 (41,948)
080 190 - Mid-Tex Gas Division Addition 080.76808 38000 (1,274)
080 190 - Mid-Tex Gas Division Addition 080.76809 37602 98,655
080 190 - Mid-Tex Gas Division Addition 080.76813 37602 197,994
080 190 - Mid-Tex Gas Division Addition 080.76814 37602 451,845
080 190 - Mid-Tex Gas Division Addition 080.76814 38000 112,961
080 190 - Mid-Tex Gas Division Addition 080.76815 37602 21,984
080 190 - Mid-Tex Gas Division Addition 080.76819 37602 94,386
080 190 - Mid-Tex Gas Division Addition 080.76819 38000 40,451
080 190 - Mid-Tex Gas Division Addition 080.76823 37602 62,959
080 190 - Mid-Tex Gas Division Addition 080.76823 38000 3,314
080 190 - Mid-Tex Gas Division Addition 080.76825 37602 11,165
080 190 - Mid-Tex Gas Division Addition 080.76826 37800 49,841
080 190 - Mid-Tex Gas Division Addition 080.76827 37602 21,317
080 190 - Mid-Tex Gas Division Addition 080.76830 37602 11,580
080 190 - Mid-Tex Gas Division Addition 080.76831 37602 456,746
080 190 - Mid-Tex Gas Division Addition 080.76832 37601 1,185,083
080 190 - Mid-Tex Gas Division Addition 080.76833 37601 (137)
080 190 - Mid-Tex Gas Division Addition 080.76835 37602 435,280
080 190 - Mid-Tex Gas Division Addition 080.76835 38000 145,093
080 190 - Mid-Tex Gas Division Addition 080.76841 37602 211,429
080 190 - Mid-Tex Gas Division Addition 080.76841 38000 23,492
080 190 - Mid-Tex Gas Division Addition 080.76842 37602 194,282
080 190 - Mid-Tex Gas Division Addition 080.76842 38000 64,761
080 190 - Mid-Tex Gas Division Addition 080.76845 37602 8,790
080 190 - Mid-Tex Gas Division Addition 080.76846 37602 (43,526)
080 190 - Mid-Tex Gas Division Addition 080.76847 37602 82,883
080 190 - Mid-Tex Gas Division Addition 080.76848 37602 49,299
080 190 - Mid-Tex Gas Division Addition 080.76857 37602 78,401
080 190 - Mid-Tex Gas Division Addition 080.76858 37602 140,194
080 190 - Mid-Tex Gas Division Addition 080.76861 37602 26,988
080 190 - Mid-Tex Gas Division Addition 080.76862 37601 138,847
080 190 - Mid-Tex Gas Division Addition 080.76864 37602 10,426
080 190 - Mid-Tex Gas Division Addition 080.76864 38000 1,158
080 190 - Mid-Tex Gas Division Addition 080.76864 38100 761,824
080 190 - Mid-Tex Gas Division Addition 080.76864 38300 19,463
080 190 - Mid-Tex Gas Division Addition 080.76867 37600 128,736
080 190 - Mid-Tex Gas Division Addition 080.76873 37602 111,034
080 190 - Mid-Tex Gas Division Addition 080.76873 38000 21,149
080 190 - Mid-Tex Gas Division Addition 080.76888 37602 185,784
080 190 - Mid-Tex Gas Division Addition 080.76888 38000 7,741
080 190 - Mid-Tex Gas Division Addition 080.76889 37602 204,051
080 190 - Mid-Tex Gas Division Addition 080.76889 38000 109,874
080 190 - Mid-Tex Gas Division Addition 080.76890 37602 184,935
080 190 - Mid-Tex Gas Division Addition 080.76890 38000 99,580
080 190 - Mid-Tex Gas Division Addition 080.76891 37602 222,265
080 190 - Mid-Tex Gas Division Addition 080.76891 38000 74,088
080 190 - Mid-Tex Gas Division Addition 080.76892 37602 207,258
080 190 - Mid-Tex Gas Division Addition 080.76892 38000 69,086
080 190 - Mid-Tex Gas Division Addition 080.76893 37602 211,776
080 190 - Mid-Tex Gas Division Addition 080.76893 38000 52,944
080 190 - Mid-Tex Gas Division Addition 080.76894 37602 217,285
080 190 - Mid-Tex Gas Division Addition 080.76894 38000 93,122
080 190 - Mid-Tex Gas Division Addition 080.76895 37602 119,862
080 190 - Mid-Tex Gas Division Addition 080.76895 38000 51,369
080 190 - Mid-Tex Gas Division Addition 080.76897 37602 175,386
080 190 - Mid-Tex Gas Division Addition 080.76897 38000 94,439
080 190 - Mid-Tex Gas Division Addition 080.76898 37602 202,163
080 190 - Mid-Tex Gas Division Addition 080.76898 38000 108,857
080 190 - Mid-Tex Gas Division Addition 080.76899 37602 135,001
080 190 - Mid-Tex Gas Division Addition 080.76899 38000 15,000
080 190 - Mid-Tex Gas Division Addition 080.76908 38000 922,238
080 190 - Mid-Tex Gas Division Addition 080.76912 37602 451,269
080 190 - Mid-Tex Gas Division Addition 080.76912 38000 61,537
080 190 - Mid-Tex Gas Division Addition 080.76913 37602 639,692
080 190 - Mid-Tex Gas Division Addition 080.76913 38000 159,923
080 190 - Mid-Tex Gas Division Addition 080.76915 37602 626,372
080 190 - Mid-Tex Gas Division Addition 080.76915 38000 110,536
080 190 - Mid-Tex Gas Division Addition 080.76921 37602 16,011
080 190 - Mid-Tex Gas Division Addition 080.76922 37602 36,827
080 190 - Mid-Tex Gas Division Addition 080.76924 37602 39,009
080 190 - Mid-Tex Gas Division Addition 080.76925 37602 143,342
080 190 - Mid-Tex Gas Division Addition 080.76925 38000 7,544
080 190 - Mid-Tex Gas Division Addition 080.76929 37602 133,148
080 190 - Mid-Tex Gas Division Addition 080.76929 38000 23,497
080 190 - Mid-Tex Gas Division Addition 080.76930 37602 11,562
080 190 - Mid-Tex Gas Division Addition 080.76931 37602 7,604
080 190 - Mid-Tex Gas Division Addition 080.76932 37602 73,231
080 190 - Mid-Tex Gas Division Addition 080.76936 39400 67,495
MTX Additions by FERC
Page 92 of 101
490
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.76937 37602 82,376
080 190 - Mid-Tex Gas Division Addition 080.76937 38000 20,594
080 190 - Mid-Tex Gas Division Addition 080.76946 37602 6,326
080 190 - Mid-Tex Gas Division Addition 080.76950 39400 1,746
080 190 - Mid-Tex Gas Division Addition 080.76951 37602 414,341
080 190 - Mid-Tex Gas Division Addition 080.76951 38000 138,114
080 190 - Mid-Tex Gas Division Addition 080.76957 37602 265,958
080 190 - Mid-Tex Gas Division Addition 080.76964 37602 108,376
080 190 - Mid-Tex Gas Division Addition 080.76965 37602 211,740
080 190 - Mid-Tex Gas Division Addition 080.76965 38000 11,144
080 190 - Mid-Tex Gas Division Addition 080.76967 37602 227,217
080 190 - Mid-Tex Gas Division Addition 080.76968 37602 16,556
080 190 - Mid-Tex Gas Division Addition 080.76971 37602 366,462
080 190 - Mid-Tex Gas Division Addition 080.76974 37602 7,792
080 190 - Mid-Tex Gas Division Addition 080.76975 37602 327,327
080 190 - Mid-Tex Gas Division Addition 080.76975 38000 24,637
080 190 - Mid-Tex Gas Division Addition 080.76978 37602 178
080 190 - Mid-Tex Gas Division Addition 080.76983 37602 498,041
080 190 - Mid-Tex Gas Division Addition 080.76983 38000 26,213
080 190 - Mid-Tex Gas Division Addition 080.76988 37602 37,966
080 190 - Mid-Tex Gas Division Addition 080.76988 38000 380
080 190 - Mid-Tex Gas Division Addition 080.76989 37602 72,710
080 190 - Mid-Tex Gas Division Addition 080.76989 38000 72,710
080 190 - Mid-Tex Gas Division Addition 080.76990 37602 31,073
080 190 - Mid-Tex Gas Division Addition 080.76992 37602 66,737
080 190 - Mid-Tex Gas Division Addition 080.76993 37602 154,998
080 190 - Mid-Tex Gas Division Addition 080.76993 38000 27,353
080 190 - Mid-Tex Gas Division Addition 080.76998 37602 1,234,139
080 190 - Mid-Tex Gas Division Addition 080.76998 38000 217,789
080 190 - Mid-Tex Gas Division Addition 080.77000 37602 82,642
080 190 - Mid-Tex Gas Division Addition 080.77000 38000 9,182
080 190 - Mid-Tex Gas Division Addition 080.77006 39400 315,183
080 190 - Mid-Tex Gas Division Addition 080.77007 37602 127,201
080 190 - Mid-Tex Gas Division Addition 080.77009 37602 60,234
080 190 - Mid-Tex Gas Division Addition 080.77011 37602 26,147
080 190 - Mid-Tex Gas Division Addition 080.77012 37602 294,517
080 190 - Mid-Tex Gas Division Addition 080.77012 37800 26,179
080 190 - Mid-Tex Gas Division Addition 080.77012 38000 6,545
080 190 - Mid-Tex Gas Division Addition 080.77016 37602 224,396
080 190 - Mid-Tex Gas Division Addition 080.77019 37602 31,936
080 190 - Mid-Tex Gas Division Addition 080.77025 37602 10,926
080 190 - Mid-Tex Gas Division Addition 080.77026 37602 1,397
080 190 - Mid-Tex Gas Division Addition 080.77031 37602 119,026
080 190 - Mid-Tex Gas Division Addition 080.77031 38000 29,757
080 190 - Mid-Tex Gas Division Addition 080.77036 37602 229,674
080 190 - Mid-Tex Gas Division Addition 080.77039 37602 560,942
080 190 - Mid-Tex Gas Division Addition 080.77039 38000 29,523
080 190 - Mid-Tex Gas Division Addition 080.77041 37602 3,626
080 190 - Mid-Tex Gas Division Addition 080.77042 37602 248,101
080 190 - Mid-Tex Gas Division Addition 080.77043 37602 87,450
080 190 - Mid-Tex Gas Division Addition 080.77043 37800 58,300
080 190 - Mid-Tex Gas Division Addition 080.77045 37602 10,162
080 190 - Mid-Tex Gas Division Addition 080.77046 37602 175,099
080 190 - Mid-Tex Gas Division Addition 080.77046 38000 19,455
080 190 - Mid-Tex Gas Division Addition 080.77048 37602 134,390
080 190 - Mid-Tex Gas Division Addition 080.77048 38000 72,364
080 190 - Mid-Tex Gas Division Addition 080.77049 37602 260,832
080 190 - Mid-Tex Gas Division Addition 080.77049 38000 65,208
080 190 - Mid-Tex Gas Division Addition 080.77051 37601 231,240
080 190 - Mid-Tex Gas Division Addition 080.77051 37800 12,847
080 190 - Mid-Tex Gas Division Addition 080.77051 38000 6,423
080 190 - Mid-Tex Gas Division Addition 080.77051 38500 6,423
080 190 - Mid-Tex Gas Division Addition 080.77054 37602 49,286
080 190 - Mid-Tex Gas Division Addition 080.77054 37800 115,001
080 190 - Mid-Tex Gas Division Addition 080.77055 37602 14,917
080 190 - Mid-Tex Gas Division Addition 080.77055 38000 2,808
080 190 - Mid-Tex Gas Division Addition 080.77057 37800 25,203
080 190 - Mid-Tex Gas Division Addition 080.77058 37602 52,376
080 190 - Mid-Tex Gas Division Addition 080.77058 37800 122,210
080 190 - Mid-Tex Gas Division Addition 080.77062 37602 95,872
080 190 - Mid-Tex Gas Division Addition 080.77062 37800 41,088
080 190 - Mid-Tex Gas Division Addition 080.77064 37602 42,436
080 190 - Mid-Tex Gas Division Addition 080.77064 37800 99,017
080 190 - Mid-Tex Gas Division Addition 080.77068 37602 8,295
080 190 - Mid-Tex Gas Division Addition 080.77069 37602 106,872
080 190 - Mid-Tex Gas Division Addition 080.77070 37602 86,240
080 190 - Mid-Tex Gas Division Addition 080.77073 37602 81,636
080 190 - Mid-Tex Gas Division Addition 080.77073 37800 66,793
080 190 - Mid-Tex Gas Division Addition 080.77074 37602 278,590
080 190 - Mid-Tex Gas Division Addition 080.77078 37602 265,741
080 190 - Mid-Tex Gas Division Addition 080.77078 38000 46,896
080 190 - Mid-Tex Gas Division Addition 080.77080 37602 65,640
080 190 - Mid-Tex Gas Division Addition 080.77080 38000 7,293
080 190 - Mid-Tex Gas Division Addition 080.77081 37602 7,998
080 190 - Mid-Tex Gas Division Addition 080.77086 37602 57,410
080 190 - Mid-Tex Gas Division Addition 080.77086 38000 3,022
080 190 - Mid-Tex Gas Division Addition 080.77087 37602 27,308
080 190 - Mid-Tex Gas Division Addition 080.77087 38000 1,437
080 190 - Mid-Tex Gas Division Addition 080.77091 37602 169,073
080 190 - Mid-Tex Gas Division Addition 080.77091 38000 50,502
080 190 - Mid-Tex Gas Division Addition 080.77092 37602 107,046
080 190 - Mid-Tex Gas Division Addition 080.77093 37602 22,222
080 190 - Mid-Tex Gas Division Addition 080.77093 38000 -
080 190 - Mid-Tex Gas Division Addition 080.77094 37602 35,929
080 190 - Mid-Tex Gas Division Addition 080.77103 37602 44,697
080 190 - Mid-Tex Gas Division Addition 080.77109 37602 602,239
080 190 - Mid-Tex Gas Division Addition 080.77109 38000 31,697
080 190 - Mid-Tex Gas Division Addition 080.77110 37602 50,260
080 190 - Mid-Tex Gas Division Addition 080.77110 37800 61,429
080 190 - Mid-Tex Gas Division Addition 080.77111 37602 652,076
080 190 - Mid-Tex Gas Division Addition 080.77113 37602 170,503
080 190 - Mid-Tex Gas Division Addition 080.77113 38000 56,834
080 190 - Mid-Tex Gas Division Addition 080.77114 37602 191,670
080 190 - Mid-Tex Gas Division Addition 080.77114 38000 38,334
080 190 - Mid-Tex Gas Division Addition 080.77119 37600 54,605
080 190 - Mid-Tex Gas Division Addition 080.77120 37600 64,033
080 190 - Mid-Tex Gas Division Addition 080.77132 37602 17,861
MTX Additions by FERC
Page 93 of 101
491
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.77140 37602 67,761
080 190 - Mid-Tex Gas Division Addition 080.77153 37602 365,351
080 190 - Mid-Tex Gas Division Addition 080.77156 37602 25,572
080 190 - Mid-Tex Gas Division Addition 080.77160 37601 110,824
080 190 - Mid-Tex Gas Division Addition 080.77160 37602 997,418
080 190 - Mid-Tex Gas Division Addition 080.77166 37602 10,038
080 190 - Mid-Tex Gas Division Addition 080.77167 37602 886,113
080 190 - Mid-Tex Gas Division Addition 080.77167 38000 98,457
080 190 - Mid-Tex Gas Division Addition 080.77197 37602 0
080 190 - Mid-Tex Gas Division Addition 080.77197 38000 35,872
080 190 - Mid-Tex Gas Division Addition 080.77198 37602 113,597
080 190 - Mid-Tex Gas Division Addition 080.77198 37800 113,597
080 190 - Mid-Tex Gas Division Addition 080.77203 37602 47,391
080 190 - Mid-Tex Gas Division Addition 080.77208 37602 121,861
080 190 - Mid-Tex Gas Division Addition 080.77208 38000 30,465
080 190 - Mid-Tex Gas Division Addition 080.77215 37602 11,199
080 190 - Mid-Tex Gas Division Addition 080.77217 37602 255,723
080 190 - Mid-Tex Gas Division Addition 080.77217 38000 63,931
080 190 - Mid-Tex Gas Division Addition 080.77218 37602 247,895
080 190 - Mid-Tex Gas Division Addition 080.77218 38000 106,241
080 190 - Mid-Tex Gas Division Addition 080.77219 37602 159,764
080 190 - Mid-Tex Gas Division Addition 080.77219 38000 75,183
080 190 - Mid-Tex Gas Division Addition 080.77220 37602 122,278
080 190 - Mid-Tex Gas Division Addition 080.77220 38000 49,944
080 190 - Mid-Tex Gas Division Addition 080.77224 37602 168,314
080 190 - Mid-Tex Gas Division Addition 080.77224 38000 65,455
080 190 - Mid-Tex Gas Division Addition 080.77227 37602 206,228
080 190 - Mid-Tex Gas Division Addition 080.77240 37602 76,021
080 190 - Mid-Tex Gas Division Addition 080.77250 37602 33,376
080 190 - Mid-Tex Gas Division Addition 080.77256 37602 21,870
080 190 - Mid-Tex Gas Division Addition 080.77258 39400 1,592
080 190 - Mid-Tex Gas Division Addition 080.77259 37602 8,039
080 190 - Mid-Tex Gas Division Addition 080.77263 37602 177,259
080 190 - Mid-Tex Gas Division Addition 080.77263 38000 116,405
080 190 - Mid-Tex Gas Division Addition 080.77264 37602 358,931
080 190 - Mid-Tex Gas Division Addition 080.77265 37602 106,592
080 190 - Mid-Tex Gas Division Addition 080.77265 38000 35,531
080 190 - Mid-Tex Gas Division Addition 080.77267 37602 372,833
080 190 - Mid-Tex Gas Division Addition 080.77267 38000 19,623
080 190 - Mid-Tex Gas Division Addition 080.77268 37602 51,546
080 190 - Mid-Tex Gas Division Addition 080.77276 37602 32,930
080 190 - Mid-Tex Gas Division Addition 080.77282 37602 88,427
080 190 - Mid-Tex Gas Division Addition 080.77286 39400 9,578
080 190 - Mid-Tex Gas Division Addition 080.77288 37602 5,978
080 190 - Mid-Tex Gas Division Addition 080.77291 37602 227,353
080 190 - Mid-Tex Gas Division Addition 080.77291 38000 75,784
080 190 - Mid-Tex Gas Division Addition 080.77294 37602 255,179
080 190 - Mid-Tex Gas Division Addition 080.77296 37602 184,424
080 190 - Mid-Tex Gas Division Addition 080.77296 38000 79,039
080 190 - Mid-Tex Gas Division Addition 080.77297 37602 431,913
080 190 - Mid-Tex Gas Division Addition 080.77297 38000 431,913
080 190 - Mid-Tex Gas Division Addition 080.77302 37602 6,605
080 190 - Mid-Tex Gas Division Addition 080.77303 37602 5,014
080 190 - Mid-Tex Gas Division Addition 080.77305 37602 316,099
080 190 - Mid-Tex Gas Division Addition 080.77305 38000 170,207
080 190 - Mid-Tex Gas Division Addition 080.77309 37602 16,110
080 190 - Mid-Tex Gas Division Addition 080.77311 37602 146,989
080 190 - Mid-Tex Gas Division Addition 080.77311 38000 16,332
080 190 - Mid-Tex Gas Division Addition 080.77315 39400 4,096
080 190 - Mid-Tex Gas Division Addition 080.77316 37602 41,500
080 190 - Mid-Tex Gas Division Addition 080.77319 37602 193,855
080 190 - Mid-Tex Gas Division Addition 080.77319 38000 14,591
080 190 - Mid-Tex Gas Division Addition 080.77320 37602 28,223
080 190 - Mid-Tex Gas Division Addition 080.77321 37602 5,699
080 190 - Mid-Tex Gas Division Addition 080.77322 37602 134,163
080 190 - Mid-Tex Gas Division Addition 080.77328 37602 348,926
080 190 - Mid-Tex Gas Division Addition 080.77328 38000 149,540
080 190 - Mid-Tex Gas Division Addition 080.77331 37602 22,981
080 190 - Mid-Tex Gas Division Addition 080.77333 39100 10,111
080 190 - Mid-Tex Gas Division Addition 080.77337 37602 1,545
080 190 - Mid-Tex Gas Division Addition 080.77340 37602 77,697
080 190 - Mid-Tex Gas Division Addition 080.77341 37602 177,025
080 190 - Mid-Tex Gas Division Addition 080.77341 38000 44,256
080 190 - Mid-Tex Gas Division Addition 080.77343 37602 46,719
080 190 - Mid-Tex Gas Division Addition 080.77348 37602 108,393
080 190 - Mid-Tex Gas Division Addition 080.77348 38000 30,572
080 190 - Mid-Tex Gas Division Addition 080.77351 37602 71,500
080 190 - Mid-Tex Gas Division Addition 080.77352 37900 11,532
080 190 - Mid-Tex Gas Division Addition 080.77354 37602 23,179
080 190 - Mid-Tex Gas Division Addition 080.77357 37602 193,675
080 190 - Mid-Tex Gas Division Addition 080.77357 38000 42,514
080 190 - Mid-Tex Gas Division Addition 080.77360 37602 34,793
080 190 - Mid-Tex Gas Division Addition 080.77363 37602 19,635
080 190 - Mid-Tex Gas Division Addition 080.77367 37602 30,239
080 190 - Mid-Tex Gas Division Addition 080.77369 37602 181,549
080 190 - Mid-Tex Gas Division Addition 080.77374 37602 -
080 190 - Mid-Tex Gas Division Addition 080.77381 37602 11,118
080 190 - Mid-Tex Gas Division Addition 080.77383 37601 963,540
080 190 - Mid-Tex Gas Division Addition 080.77384 37602 285,651
080 190 - Mid-Tex Gas Division Addition 080.77384 38000 31,739
080 190 - Mid-Tex Gas Division Addition 080.77387 37602 (18,057)
080 190 - Mid-Tex Gas Division Addition 080.77389 37602 35,699
080 190 - Mid-Tex Gas Division Addition 080.77392 37602 21,739
080 190 - Mid-Tex Gas Division Addition 080.77393 37602 8,219
080 190 - Mid-Tex Gas Division Addition 080.77394 37602 446,799
080 190 - Mid-Tex Gas Division Addition 080.77394 38000 118,770
080 190 - Mid-Tex Gas Division Addition 080.77395 37602 672,725
080 190 - Mid-Tex Gas Division Addition 080.77396 37601 316,572
080 190 - Mid-Tex Gas Division Addition 080.77396 37800 16,662
080 190 - Mid-Tex Gas Division Addition 080.77398 37602 7,119
080 190 - Mid-Tex Gas Division Addition 080.77399 37602 27,526
080 190 - Mid-Tex Gas Division Addition 080.77400 37602 4,519
080 190 - Mid-Tex Gas Division Addition 080.77401 37602 727,408
080 190 - Mid-Tex Gas Division Addition 080.77401 38000 484,938
080 190 - Mid-Tex Gas Division Addition 080.77404 37602 3,618
080 190 - Mid-Tex Gas Division Addition 080.77407 37602 20,518
080 190 - Mid-Tex Gas Division Addition 080.77414 37602 401,058
MTX Additions by FERC
Page 94 of 101
492
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.77414 38000 126,650
080 190 - Mid-Tex Gas Division Addition 080.77415 39400 1,628
080 190 - Mid-Tex Gas Division Addition 080.77422 37602 166,680
080 190 - Mid-Tex Gas Division Addition 080.77422 38000 29,414
080 190 - Mid-Tex Gas Division Addition 080.77424 37602 21,805
080 190 - Mid-Tex Gas Division Addition 080.77424 38000 1,148
080 190 - Mid-Tex Gas Division Addition 080.77426 39906 251,397
080 190 - Mid-Tex Gas Division Addition 080.77427 37602 60,548
080 190 - Mid-Tex Gas Division Addition 080.77428 37602 388,037
080 190 - Mid-Tex Gas Division Addition 080.77428 38000 33,742
080 190 - Mid-Tex Gas Division Addition 080.77429 37602 761,590
080 190 - Mid-Tex Gas Division Addition 080.77429 38000 253,863
080 190 - Mid-Tex Gas Division Addition 080.77430 37602 298,345
080 190 - Mid-Tex Gas Division Addition 080.77430 38000 15,702
080 190 - Mid-Tex Gas Division Addition 080.77431 37602 31,139
080 190 - Mid-Tex Gas Division Addition 080.77432 37602 303,541
080 190 - Mid-Tex Gas Division Addition 080.77432 38000 95,855
080 190 - Mid-Tex Gas Division Addition 080.77434 37602 216,873
080 190 - Mid-Tex Gas Division Addition 080.77434 38000 9,036
080 190 - Mid-Tex Gas Division Addition 080.77435 37602 497,984
080 190 - Mid-Tex Gas Division Addition 080.77435 38000 55,332
080 190 - Mid-Tex Gas Division Addition 080.77441 37602 38,258
080 190 - Mid-Tex Gas Division Addition 080.77445 37602 266,009
080 190 - Mid-Tex Gas Division Addition 080.77445 38000 11,084
080 190 - Mid-Tex Gas Division Addition 080.77448 37602 335,220
080 190 - Mid-Tex Gas Division Addition 080.77448 38000 37,247
080 190 - Mid-Tex Gas Division Addition 080.77451 39400 7,239
080 190 - Mid-Tex Gas Division Addition 080.77452 37602 3,697
080 190 - Mid-Tex Gas Division Addition 080.77452 38000 411
080 190 - Mid-Tex Gas Division Addition 080.77456 37602 45,273
080 190 - Mid-Tex Gas Division Addition 080.77456 38000 2,383
080 190 - Mid-Tex Gas Division Addition 080.77459 37602 143,518
080 190 - Mid-Tex Gas Division Addition 080.77459 38000 35,880
080 190 - Mid-Tex Gas Division Addition 080.77461 37602 92,858
080 190 - Mid-Tex Gas Division Addition 080.77461 37800 83,572
080 190 - Mid-Tex Gas Division Addition 080.77461 38000 9,286
080 190 - Mid-Tex Gas Division Addition 080.77463 37602 48,408
080 190 - Mid-Tex Gas Division Addition 080.77463 38000 2,548
080 190 - Mid-Tex Gas Division Addition 080.77467 37602 76,204
080 190 - Mid-Tex Gas Division Addition 080.77470 37602 178,951
080 190 - Mid-Tex Gas Division Addition 080.77474 37602 47,753
080 190 - Mid-Tex Gas Division Addition 080.77478 37602 108,884
080 190 - Mid-Tex Gas Division Addition 080.77487 39004 15,100
080 190 - Mid-Tex Gas Division Addition 080.77490 37602 36,648
080 190 - Mid-Tex Gas Division Addition 080.77497 37602 792,720
080 190 - Mid-Tex Gas Division Addition 080.77498 37602 5,017
080 190 - Mid-Tex Gas Division Addition 080.77501 39000 1,336,856
080 190 - Mid-Tex Gas Division Addition 080.77505 38000 96,345
080 190 - Mid-Tex Gas Division Addition 080.77506 37602 433,108
080 190 - Mid-Tex Gas Division Addition 080.77506 38000 185,618
080 190 - Mid-Tex Gas Division Addition 080.77517 37602 85,567
080 190 - Mid-Tex Gas Division Addition 080.77517 38000 21,392
080 190 - Mid-Tex Gas Division Addition 080.77519 37602 204,042
080 190 - Mid-Tex Gas Division Addition 080.77519 38000 87,446
080 190 - Mid-Tex Gas Division Addition 080.77520 37602 429,554
080 190 - Mid-Tex Gas Division Addition 080.77520 38000 75,804
080 190 - Mid-Tex Gas Division Addition 080.77521 37601 15,736
080 190 - Mid-Tex Gas Division Addition 080.77521 37602 246,535
080 190 - Mid-Tex Gas Division Addition 080.77521 37800 246,535
080 190 - Mid-Tex Gas Division Addition 080.77521 38000 15,736
080 190 - Mid-Tex Gas Division Addition 080.77523 37602 60,053
080 190 - Mid-Tex Gas Division Addition 080.77523 38000 6,673
080 190 - Mid-Tex Gas Division Addition 080.77526 37602 7,263
080 190 - Mid-Tex Gas Division Addition 080.77532 37602 329,502
080 190 - Mid-Tex Gas Division Addition 080.77532 38000 58,147
080 190 - Mid-Tex Gas Division Addition 080.77533 37602 226,003
080 190 - Mid-Tex Gas Division Addition 080.77533 38000 96,858
080 190 - Mid-Tex Gas Division Addition 080.77534 37600 51,768
080 190 - Mid-Tex Gas Division Addition 080.77540 37601 266,735
080 190 - Mid-Tex Gas Division Addition 080.77544 37602 27,223
080 190 - Mid-Tex Gas Division Addition 080.77545 37602 179,325
080 190 - Mid-Tex Gas Division Addition 080.77545 38000 24,453
080 190 - Mid-Tex Gas Division Addition 080.77546 37602 40,175
080 190 - Mid-Tex Gas Division Addition 080.77547 38000 -
080 190 - Mid-Tex Gas Division Addition 080.77548 37602 151,443
080 190 - Mid-Tex Gas Division Addition 080.77548 37800 123,908
080 190 - Mid-Tex Gas Division Addition 080.77551 37602 25,709
080 190 - Mid-Tex Gas Division Addition 080.77552 37602 247,464
080 190 - Mid-Tex Gas Division Addition 080.77552 38000 13,299
080 190 - Mid-Tex Gas Division Addition 080.77556 37602 159,189
080 190 - Mid-Tex Gas Division Addition 080.77565 37602 3,693
080 190 - Mid-Tex Gas Division Addition 080.77566 37602 325,654
080 190 - Mid-Tex Gas Division Addition 080.77570 38000 763,331
080 190 - Mid-Tex Gas Division Addition 080.77577 37602 41,520
080 190 - Mid-Tex Gas Division Addition 080.77589 37602 5,360
080 190 - Mid-Tex Gas Division Addition 080.77594 37800 82,503
080 190 - Mid-Tex Gas Division Addition 080.77595 37602 325,524
080 190 - Mid-Tex Gas Division Addition 080.77595 38000 3,288
080 190 - Mid-Tex Gas Division Addition 080.77596 37602 372,690
080 190 - Mid-Tex Gas Division Addition 080.77596 38000 111,323
080 190 - Mid-Tex Gas Division Addition 080.77598 37601 27,385
080 190 - Mid-Tex Gas Division Addition 080.77598 37602 63,898
080 190 - Mid-Tex Gas Division Addition 080.77598 37800 82,155
080 190 - Mid-Tex Gas Division Addition 080.77598 38000 9,128
080 190 - Mid-Tex Gas Division Addition 080.77605 37602 11,027
080 190 - Mid-Tex Gas Division Addition 080.77608 39400 12,443
080 190 - Mid-Tex Gas Division Addition 080.77610 37602 543,491
080 190 - Mid-Tex Gas Division Addition 080.77615 37602 177,307
080 190 - Mid-Tex Gas Division Addition 080.77616 37601 26,838
080 190 - Mid-Tex Gas Division Addition 080.77616 37602 456,243
080 190 - Mid-Tex Gas Division Addition 080.77616 38000 53,676
080 190 - Mid-Tex Gas Division Addition 080.77619 37602 12,638
080 190 - Mid-Tex Gas Division Addition 080.77621 37602 23,828
080 190 - Mid-Tex Gas Division Addition 080.77633 39400 10,838
080 190 - Mid-Tex Gas Division Addition 080.77634 37800 11,434
080 190 - Mid-Tex Gas Division Addition 080.77637 37602 8,913
080 190 - Mid-Tex Gas Division Addition 080.77643 39004 15,514
MTX Additions by FERC
Page 95 of 101
493
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.77647 39400 3,612
080 190 - Mid-Tex Gas Division Addition 080.77648 37602 48,423
080 190 - Mid-Tex Gas Division Addition 080.77648 37800 59,183
080 190 - Mid-Tex Gas Division Addition 080.77650 37602 52,958
080 190 - Mid-Tex Gas Division Addition 080.77664 37602 245,864
080 190 - Mid-Tex Gas Division Addition 080.77665 37602 23,229
080 190 - Mid-Tex Gas Division Addition 080.77669 37601 309,297
080 190 - Mid-Tex Gas Division Addition 080.77670 37601 56,511
080 190 - Mid-Tex Gas Division Addition 080.77670 37602 131,859
080 190 - Mid-Tex Gas Division Addition 080.77670 37800 169,533
080 190 - Mid-Tex Gas Division Addition 080.77670 38000 18,837
080 190 - Mid-Tex Gas Division Addition 080.77673 37602 175,661
080 190 - Mid-Tex Gas Division Addition 080.77673 38000 43,915
080 190 - Mid-Tex Gas Division Addition 080.77674 37602 200,022
080 190 - Mid-Tex Gas Division Addition 080.77674 38000 22,225
080 190 - Mid-Tex Gas Division Addition 080.77675 37602 155,372
080 190 - Mid-Tex Gas Division Addition 080.77675 38000 38,843
080 190 - Mid-Tex Gas Division Addition 080.77686 38000 9,322
080 190 - Mid-Tex Gas Division Addition 080.77687 37602 26,501
080 190 - Mid-Tex Gas Division Addition 080.77688 37602 46,010
080 190 - Mid-Tex Gas Division Addition 080.77689 37602 249,265
080 190 - Mid-Tex Gas Division Addition 080.77689 38000 43,988
080 190 - Mid-Tex Gas Division Addition 080.77690 37602 13,268
080 190 - Mid-Tex Gas Division Addition 080.77692 37602 154,724
080 190 - Mid-Tex Gas Division Addition 080.77692 38000 27,304
080 190 - Mid-Tex Gas Division Addition 080.77693 37601 2,015,444
080 190 - Mid-Tex Gas Division Addition 080.77693 37800 221,477
080 190 - Mid-Tex Gas Division Addition 080.77694 37602 239,240
080 190 - Mid-Tex Gas Division Addition 080.77694 38000 59,810
080 190 - Mid-Tex Gas Division Addition 080.77695 37602 175,642
080 190 - Mid-Tex Gas Division Addition 080.77695 38000 43,911
080 190 - Mid-Tex Gas Division Addition 080.77700 37601 219,691
080 190 - Mid-Tex Gas Division Addition 080.77706 39000 22,361
080 190 - Mid-Tex Gas Division Addition 080.77708 37602 475,704
080 190 - Mid-Tex Gas Division Addition 080.77710 37602 268,729
080 190 - Mid-Tex Gas Division Addition 080.77710 38000 63,035
080 190 - Mid-Tex Gas Division Addition 080.77714 37602 353,233
080 190 - Mid-Tex Gas Division Addition 080.77714 38000 117,744
080 190 - Mid-Tex Gas Division Addition 080.77715 37602 600,461
080 190 - Mid-Tex Gas Division Addition 080.77715 38000 233,513
080 190 - Mid-Tex Gas Division Addition 080.77716 37602 304,677
080 190 - Mid-Tex Gas Division Addition 080.77716 38000 49,599
080 190 - Mid-Tex Gas Division Addition 080.77717 37602 281,224
080 190 - Mid-Tex Gas Division Addition 080.77717 38000 109,365
080 190 - Mid-Tex Gas Division Addition 080.77721 37602 203,729
080 190 - Mid-Tex Gas Division Addition 080.77721 38000 50,932
080 190 - Mid-Tex Gas Division Addition 080.77724 37602 38,752
080 190 - Mid-Tex Gas Division Addition 080.77724 38000 1,615
080 190 - Mid-Tex Gas Division Addition 080.77730 37602 259,703
080 190 - Mid-Tex Gas Division Addition 080.77730 38000 28,856
080 190 - Mid-Tex Gas Division Addition 080.77736 37602 49,395
080 190 - Mid-Tex Gas Division Addition 080.77743 37602 52,380
080 190 - Mid-Tex Gas Division Addition 080.77743 38000 5,820
080 190 - Mid-Tex Gas Division Addition 080.77744 37602 777,901
080 190 - Mid-Tex Gas Division Addition 080.77744 38000 86,433
080 190 - Mid-Tex Gas Division Addition 080.77746 37602 62,805
080 190 - Mid-Tex Gas Division Addition 080.77746 38000 11,083
080 190 - Mid-Tex Gas Division Addition 080.77747 39000 25,307
080 190 - Mid-Tex Gas Division Addition 080.77749 37602 108,392
080 190 - Mid-Tex Gas Division Addition 080.77750 37602 222,446
080 190 - Mid-Tex Gas Division Addition 080.77750 38000 98,656
080 190 - Mid-Tex Gas Division Addition 080.77751 37602 405,128
080 190 - Mid-Tex Gas Division Addition 080.77751 38000 35,229
080 190 - Mid-Tex Gas Division Addition 080.77755 37602 1,353,588
080 190 - Mid-Tex Gas Division Addition 080.77755 38000 220,351
080 190 - Mid-Tex Gas Division Addition 080.77756 37601 2,246
080 190 - Mid-Tex Gas Division Addition 080.77756 37602 24,706
080 190 - Mid-Tex Gas Division Addition 080.77756 37800 17,968
080 190 - Mid-Tex Gas Division Addition 080.77760 37602 22,606
080 190 - Mid-Tex Gas Division Addition 080.77760 38000 3,989
080 190 - Mid-Tex Gas Division Addition 080.77763 37602 7,282
080 190 - Mid-Tex Gas Division Addition 080.77764 37602 113,428
080 190 - Mid-Tex Gas Division Addition 080.77764 38000 113,428
080 190 - Mid-Tex Gas Division Addition 080.77768 39000 22,353
080 190 - Mid-Tex Gas Division Addition 080.77771 37602 189,209
080 190 - Mid-Tex Gas Division Addition 080.77771 38000 81,089
080 190 - Mid-Tex Gas Division Addition 080.77772 37800 7,989
080 190 - Mid-Tex Gas Division Addition 080.77786 37602 (21,055)
080 190 - Mid-Tex Gas Division Addition 080.77787 37602 10,689
080 190 - Mid-Tex Gas Division Addition 080.77790 37602 149,378
080 190 - Mid-Tex Gas Division Addition 080.77791 37602 221,806
080 190 - Mid-Tex Gas Division Addition 080.77791 38000 147,870
080 190 - Mid-Tex Gas Division Addition 080.77793 37602 1,009
080 190 - Mid-Tex Gas Division Addition 080.77794 37602 35,799
080 190 - Mid-Tex Gas Division Addition 080.77802 37602 34,042
080 190 - Mid-Tex Gas Division Addition 080.77808 37602 602,124
080 190 - Mid-Tex Gas Division Addition 080.77808 38000 150,531
080 190 - Mid-Tex Gas Division Addition 080.77810 37602 418,006
080 190 - Mid-Tex Gas Division Addition 080.77810 38000 167,202
080 190 - Mid-Tex Gas Division Addition 080.77812 37602 380,974
080 190 - Mid-Tex Gas Division Addition 080.77812 38000 95,244
080 190 - Mid-Tex Gas Division Addition 080.77813 37602 1,219
080 190 - Mid-Tex Gas Division Addition 080.77814 37602 286,860
080 190 - Mid-Tex Gas Division Addition 080.77814 38000 71,715
080 190 - Mid-Tex Gas Division Addition 080.77815 37602 299,106
080 190 - Mid-Tex Gas Division Addition 080.77815 38000 74,777
080 190 - Mid-Tex Gas Division Addition 080.77819 37602 132,293
080 190 - Mid-Tex Gas Division Addition 080.77819 38000 14,699
080 190 - Mid-Tex Gas Division Addition 080.77821 37602 2,871
080 190 - Mid-Tex Gas Division Addition 080.77823 37602 136,308
080 190 - Mid-Tex Gas Division Addition 080.77823 38000 7,174
080 190 - Mid-Tex Gas Division Addition 080.77825 37602 168,246
080 190 - Mid-Tex Gas Division Addition 080.77825 38000 18,694
080 190 - Mid-Tex Gas Division Addition 080.77826 37602 134,241
080 190 - Mid-Tex Gas Division Addition 080.77826 38000 75,510
080 190 - Mid-Tex Gas Division Addition 080.77832 37602 32,597
080 190 - Mid-Tex Gas Division Addition 080.77840 37602 768,127
MTX Additions by FERC
Page 96 of 101
494
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.77840 38000 23,757
080 190 - Mid-Tex Gas Division Addition 080.77842 37601 32,158
080 190 - Mid-Tex Gas Division Addition 080.77842 37602 289,420
080 190 - Mid-Tex Gas Division Addition 080.77842 38000 32,158
080 190 - Mid-Tex Gas Division Addition 080.77854 37602 71,116
080 190 - Mid-Tex Gas Division Addition 080.77854 38000 7,902
080 190 - Mid-Tex Gas Division Addition 080.77860 37602 384,759
080 190 - Mid-Tex Gas Division Addition 080.77860 38000 33,457
080 190 - Mid-Tex Gas Division Addition 080.77865 37602 112,045
080 190 - Mid-Tex Gas Division Addition 080.77865 38000 5,897
080 190 - Mid-Tex Gas Division Addition 080.77867 37602 46,100
080 190 - Mid-Tex Gas Division Addition 080.77867 37800 173,424
080 190 - Mid-Tex Gas Division Addition 080.77878 37602 32,749
080 190 - Mid-Tex Gas Division Addition 080.77893 37800 144,948
080 190 - Mid-Tex Gas Division Addition 080.77894 37602 27,096
080 190 - Mid-Tex Gas Division Addition 080.77894 37800 108,386
080 190 - Mid-Tex Gas Division Addition 080.77895 37800 121,255
080 190 - Mid-Tex Gas Division Addition 080.77897 37602 17,515
080 190 - Mid-Tex Gas Division Addition 080.77898 37602 54,536
080 190 - Mid-Tex Gas Division Addition 080.77899 37602 101,288
080 190 - Mid-Tex Gas Division Addition 080.77899 38000 19,293
080 190 - Mid-Tex Gas Division Addition 080.77905 38000 188,877
080 190 - Mid-Tex Gas Division Addition 080.77907 37602 4,561
080 190 - Mid-Tex Gas Division Addition 080.77909 37601 945,669
080 190 - Mid-Tex Gas Division Addition 080.77912 37602 160,319
080 190 - Mid-Tex Gas Division Addition 080.77912 38000 28,292
080 190 - Mid-Tex Gas Division Addition 080.77914 37602 62,442
080 190 - Mid-Tex Gas Division Addition 080.77914 38000 15,611
080 190 - Mid-Tex Gas Division Addition 080.77916 37602 86,587
080 190 - Mid-Tex Gas Division Addition 080.77916 38000 2,678
080 190 - Mid-Tex Gas Division Addition 080.77920 37602 172,448
080 190 - Mid-Tex Gas Division Addition 080.77920 38000 21,314
080 190 - Mid-Tex Gas Division Addition 080.77921 37602 51,212
080 190 - Mid-Tex Gas Division Addition 080.77921 37800 34,141
080 190 - Mid-Tex Gas Division Addition 080.77922 37800 50,784
080 190 - Mid-Tex Gas Division Addition 080.77923 37601 11,482
080 190 - Mid-Tex Gas Division Addition 080.77923 37602 45,928
080 190 - Mid-Tex Gas Division Addition 080.77923 37800 57,410
080 190 - Mid-Tex Gas Division Addition 080.77924 37601 12,002
080 190 - Mid-Tex Gas Division Addition 080.77924 37602 60,012
080 190 - Mid-Tex Gas Division Addition 080.77924 37800 48,010
080 190 - Mid-Tex Gas Division Addition 080.77925 37601 12,757
080 190 - Mid-Tex Gas Division Addition 080.77925 37602 63,785
080 190 - Mid-Tex Gas Division Addition 080.77925 37800 51,028
080 190 - Mid-Tex Gas Division Addition 080.77926 37601 9,179
080 190 - Mid-Tex Gas Division Addition 080.77926 37602 91,785
080 190 - Mid-Tex Gas Division Addition 080.77926 38500 82,607
080 190 - Mid-Tex Gas Division Addition 080.77927 37601 12,874
080 190 - Mid-Tex Gas Division Addition 080.77927 37602 64,368
080 190 - Mid-Tex Gas Division Addition 080.77927 37800 51,495
080 190 - Mid-Tex Gas Division Addition 080.77928 37800 46,729
080 190 - Mid-Tex Gas Division Addition 080.77929 38500 50,534
080 190 - Mid-Tex Gas Division Addition 080.77930 37601 11,037
080 190 - Mid-Tex Gas Division Addition 080.77930 37602 66,223
080 190 - Mid-Tex Gas Division Addition 080.77930 37800 33,112
080 190 - Mid-Tex Gas Division Addition 080.77932 37800 40,356
080 190 - Mid-Tex Gas Division Addition 080.77933 37602 60,667
080 190 - Mid-Tex Gas Division Addition 080.77933 37800 40,445
080 190 - Mid-Tex Gas Division Addition 080.77934 37601 9,155
080 190 - Mid-Tex Gas Division Addition 080.77934 37602 41,199
080 190 - Mid-Tex Gas Division Addition 080.77934 37800 41,199
080 190 - Mid-Tex Gas Division Addition 080.77941 37602 23,572
080 190 - Mid-Tex Gas Division Addition 080.77950 39400 12,861
080 190 - Mid-Tex Gas Division Addition 080.77953 37602 18,104
080 190 - Mid-Tex Gas Division Addition 080.77960 37601 2,750
080 190 - Mid-Tex Gas Division Addition 080.77960 37602 195,269
080 190 - Mid-Tex Gas Division Addition 080.77960 38000 77,007
080 190 - Mid-Tex Gas Division Addition 080.77961 37602 3,057
080 190 - Mid-Tex Gas Division Addition 080.77967 37602 (128,444)
080 190 - Mid-Tex Gas Division Addition 080.77967 38000 (973)
080 190 - Mid-Tex Gas Division Addition 080.77969 39004 16,396
080 190 - Mid-Tex Gas Division Addition 080.77970 37602 336,850
080 190 - Mid-Tex Gas Division Addition 080.77970 38000 17,729
080 190 - Mid-Tex Gas Division Addition 080.77971 37602 140,637
080 190 - Mid-Tex Gas Division Addition 080.77971 38000 17,382
080 190 - Mid-Tex Gas Division Addition 080.77972 37602 (8,476)
080 190 - Mid-Tex Gas Division Addition 080.77972 38000 2,660
080 190 - Mid-Tex Gas Division Addition 080.77985 37602 142,759
080 190 - Mid-Tex Gas Division Addition 080.77985 38000 119,970
080 190 - Mid-Tex Gas Division Addition 080.77991 37800 47,532
080 190 - Mid-Tex Gas Division Addition 080.77991 38700 0
080 190 - Mid-Tex Gas Division Addition 080.78001 37602 244,501
080 190 - Mid-Tex Gas Division Addition 080.78012 37602 2,869
080 190 - Mid-Tex Gas Division Addition 080.78014 37602 231,962
080 190 - Mid-Tex Gas Division Addition 080.78014 38000 31,631
080 190 - Mid-Tex Gas Division Addition 080.78025 37602 13,770
080 190 - Mid-Tex Gas Division Addition 080.78026 37602 39,645
080 190 - Mid-Tex Gas Division Addition 080.78027 37602 5,524
080 190 - Mid-Tex Gas Division Addition 080.78028 37602 27,832
080 190 - Mid-Tex Gas Division Addition 080.78030 37602 147,802
080 190 - Mid-Tex Gas Division Addition 080.78042 37602 91,057
080 190 - Mid-Tex Gas Division Addition 080.78047 37602 26,353
080 190 - Mid-Tex Gas Division Addition 080.78049 37602 185,589
080 190 - Mid-Tex Gas Division Addition 080.78049 38000 52,346
080 190 - Mid-Tex Gas Division Addition 080.78062 37602 12,838
080 190 - Mid-Tex Gas Division Addition 080.78064 37602 18,503
080 190 - Mid-Tex Gas Division Addition 080.78064 38000 4,857
080 190 - Mid-Tex Gas Division Addition 080.78075 37602 373,749
080 190 - Mid-Tex Gas Division Addition 080.78075 38000 50,966
080 190 - Mid-Tex Gas Division Addition 080.78076 37602 18,695
080 190 - Mid-Tex Gas Division Addition 080.78081 37602 39,034
080 190 - Mid-Tex Gas Division Addition 080.78081 38000 9,759
080 190 - Mid-Tex Gas Division Addition 080.78092 37800 73,735
080 190 - Mid-Tex Gas Division Addition 080.78093 37601 819,592
080 190 - Mid-Tex Gas Division Addition 080.78098 37602 33,776
080 190 - Mid-Tex Gas Division Addition 080.78102 37602 27,797
080 190 - Mid-Tex Gas Division Addition 080.78104 37602 22,876
MTX Additions by FERC
Page 97 of 101
495
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.78104 38000 1,204
080 190 - Mid-Tex Gas Division Addition 080.78105 37602 7,857
080 190 - Mid-Tex Gas Division Addition 080.78105 37800 44,525
080 190 - Mid-Tex Gas Division Addition 080.78109 37602 157,509
080 190 - Mid-Tex Gas Division Addition 080.78109 38000 67,504
080 190 - Mid-Tex Gas Division Addition 080.78120 37602 11,248
080 190 - Mid-Tex Gas Division Addition 080.78125 37602 233,750
080 190 - Mid-Tex Gas Division Addition 080.78127 37602 91,920
080 190 - Mid-Tex Gas Division Addition 080.78128 39000 9,008
080 190 - Mid-Tex Gas Division Addition 080.78129 37602 49,086
080 190 - Mid-Tex Gas Division Addition 080.78130 39400 1,682
080 190 - Mid-Tex Gas Division Addition 080.78131 37602 (12,782)
080 190 - Mid-Tex Gas Division Addition 080.78133 37602 405,597
080 190 - Mid-Tex Gas Division Addition 080.78133 38000 228,148
080 190 - Mid-Tex Gas Division Addition 080.78137 37602 (47,439)
080 190 - Mid-Tex Gas Division Addition 080.78143 37602 363,152
080 190 - Mid-Tex Gas Division Addition 080.78143 38000 50,438
080 190 - Mid-Tex Gas Division Addition 080.78145 37602 26,254
080 190 - Mid-Tex Gas Division Addition 080.78145 38000 924
080 190 - Mid-Tex Gas Division Addition 080.78146 37602 140,024
080 190 - Mid-Tex Gas Division Addition 080.78146 38000 35,006
080 190 - Mid-Tex Gas Division Addition 080.78147 37602 201,665
080 190 - Mid-Tex Gas Division Addition 080.78147 38000 50,416
080 190 - Mid-Tex Gas Division Addition 080.78149 37602 101,027
080 190 - Mid-Tex Gas Division Addition 080.78149 38000 17,828
080 190 - Mid-Tex Gas Division Addition 080.78150 37602 32,149
080 190 - Mid-Tex Gas Division Addition 080.78153 37602 (113,136)
080 190 - Mid-Tex Gas Division Addition 080.78155 37602 9,167
080 190 - Mid-Tex Gas Division Addition 080.78155 38000 1,019
080 190 - Mid-Tex Gas Division Addition 080.78161 39400 442,641
080 190 - Mid-Tex Gas Division Addition 080.78163 39400 217,891
080 190 - Mid-Tex Gas Division Addition 080.78167 37602 41,746
080 190 - Mid-Tex Gas Division Addition 080.78168 39906 7,729
080 190 - Mid-Tex Gas Division Addition 080.78169 37602 41,891
080 190 - Mid-Tex Gas Division Addition 080.78169 38000 4,655
080 190 - Mid-Tex Gas Division Addition 080.78172 37602 369,251
080 190 - Mid-Tex Gas Division Addition 080.78172 38000 290,126
080 190 - Mid-Tex Gas Division Addition 080.78173 37602 50,111
080 190 - Mid-Tex Gas Division Addition 080.78173 38000 5,568
080 190 - Mid-Tex Gas Division Addition 080.78176 37602 211,753
080 190 - Mid-Tex Gas Division Addition 080.78176 38000 28,875
080 190 - Mid-Tex Gas Division Addition 080.78181 37602 26,463
080 190 - Mid-Tex Gas Division Addition 080.78183 38000 166,078
080 190 - Mid-Tex Gas Division Addition 080.78184 37602 158,489
080 190 - Mid-Tex Gas Division Addition 080.78184 38000 52,830
080 190 - Mid-Tex Gas Division Addition 080.78187 37602 6,478
080 190 - Mid-Tex Gas Division Addition 080.78189 37602 346,596
080 190 - Mid-Tex Gas Division Addition 080.78189 38000 115,532
080 190 - Mid-Tex Gas Division Addition 080.78192 37602 169,105
080 190 - Mid-Tex Gas Division Addition 080.78193 37602 283,066
080 190 - Mid-Tex Gas Division Addition 080.78193 38000 231,600
080 190 - Mid-Tex Gas Division Addition 080.78194 37602 517,776
080 190 - Mid-Tex Gas Division Addition 080.78194 38000 304,090
080 190 - Mid-Tex Gas Division Addition 080.78195 37602 18,776
080 190 - Mid-Tex Gas Division Addition 080.78201 37602 33,901
080 190 - Mid-Tex Gas Division Addition 080.78204 37602 14,524
080 190 - Mid-Tex Gas Division Addition 080.78205 37602 (11,403)
080 190 - Mid-Tex Gas Division Addition 080.78205 38000 (1,267)
080 190 - Mid-Tex Gas Division Addition 080.78216 37800 32,030
080 190 - Mid-Tex Gas Division Addition 080.78218 37602 330,623
080 190 - Mid-Tex Gas Division Addition 080.78220 37602 10,986
080 190 - Mid-Tex Gas Division Addition 080.78226 38000 5,278
080 190 - Mid-Tex Gas Division Addition 080.78229 37602 55,925
080 190 - Mid-Tex Gas Division Addition 080.78229 38000 2,943
080 190 - Mid-Tex Gas Division Addition 080.78230 37602 390,389
080 190 - Mid-Tex Gas Division Addition 080.78230 38000 43,377
080 190 - Mid-Tex Gas Division Addition 080.78232 39400 5,430
080 190 - Mid-Tex Gas Division Addition 080.78233 37602 7,446
080 190 - Mid-Tex Gas Division Addition 080.78233 38000 141,473
080 190 - Mid-Tex Gas Division Addition 080.78234 37602 0
080 190 - Mid-Tex Gas Division Addition 080.78247 37602 (1,715)
080 190 - Mid-Tex Gas Division Addition 080.78252 37602 35,394
080 190 - Mid-Tex Gas Division Addition 080.78254 37602 7,838
080 190 - Mid-Tex Gas Division Addition 080.78256 37602 23,382
080 190 - Mid-Tex Gas Division Addition 080.78257 37602 8,165
080 190 - Mid-Tex Gas Division Addition 080.78262 37602 19,749
080 190 - Mid-Tex Gas Division Addition 080.78263 37602 12,098
080 190 - Mid-Tex Gas Division Addition 080.78264 37602 443,571
080 190 - Mid-Tex Gas Division Addition 080.78270 37602 33,011
080 190 - Mid-Tex Gas Division Addition 080.78283 37602 36,531
080 190 - Mid-Tex Gas Division Addition 080.78283 38000 572
080 190 - Mid-Tex Gas Division Addition 080.78300 37602 350,273
080 190 - Mid-Tex Gas Division Addition 080.78300 38000 7
080 190 - Mid-Tex Gas Division Addition 080.78301 37602 323,844
080 190 - Mid-Tex Gas Division Addition 080.78301 38000 35,983
080 190 - Mid-Tex Gas Division Addition 080.78314 37602 24,534
080 190 - Mid-Tex Gas Division Addition 080.78319 37602 (57,174)
080 190 - Mid-Tex Gas Division Addition 080.78337 37602 102,384
080 190 - Mid-Tex Gas Division Addition 080.78338 37602 30,958
080 190 - Mid-Tex Gas Division Addition 080.78344 37602 15,949
080 190 - Mid-Tex Gas Division Addition 080.78345 37602 17,444
080 190 - Mid-Tex Gas Division Addition 080.78349 37602 394,484
080 190 - Mid-Tex Gas Division Addition 080.78349 38000 98,621
080 190 - Mid-Tex Gas Division Addition 080.78350 37602 259,524
080 190 - Mid-Tex Gas Division Addition 080.78350 38000 5,296
080 190 - Mid-Tex Gas Division Addition 080.78351 39906 24,582
080 190 - Mid-Tex Gas Division Addition 080.78358 37602 10,904
080 190 - Mid-Tex Gas Division Addition 080.78364 37602 73,089
080 190 - Mid-Tex Gas Division Addition 080.78366 37602 73,330
080 190 - Mid-Tex Gas Division Addition 080.78367 37602 107,600
080 190 - Mid-Tex Gas Division Addition 080.78374 37602 70,041
080 190 - Mid-Tex Gas Division Addition 080.78374 38000 3,686
080 190 - Mid-Tex Gas Division Addition 080.78376 39400 4,835
080 190 - Mid-Tex Gas Division Addition 080.78378 38000 4,303
080 190 - Mid-Tex Gas Division Addition 080.78379 37602 71,929
080 190 - Mid-Tex Gas Division Addition 080.78384 37602 (232,257)
080 190 - Mid-Tex Gas Division Addition 080.78384 37800 (82,949)
MTX Additions by FERC
Page 98 of 101
496
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.78384 38000 (16,590)
080 190 - Mid-Tex Gas Division Addition 080.78386 37602 3,112
080 190 - Mid-Tex Gas Division Addition 080.78389 37602 241,354
080 190 - Mid-Tex Gas Division Addition 080.78389 38000 80,451
080 190 - Mid-Tex Gas Division Addition 080.78396 37602 24,344
080 190 - Mid-Tex Gas Division Addition 080.78398 37602 440,300
080 190 - Mid-Tex Gas Division Addition 080.78398 38000 18,346
080 190 - Mid-Tex Gas Division Addition 080.78399 37602 7,008
080 190 - Mid-Tex Gas Division Addition 080.78399 38000 369
080 190 - Mid-Tex Gas Division Addition 080.78400 37602 489,688
080 190 - Mid-Tex Gas Division Addition 080.78400 38000 25,773
080 190 - Mid-Tex Gas Division Addition 080.78401 37602 218,645
080 190 - Mid-Tex Gas Division Addition 080.78401 38000 38,584
080 190 - Mid-Tex Gas Division Addition 080.78402 37602 347,658
080 190 - Mid-Tex Gas Division Addition 080.78402 38000 18,298
080 190 - Mid-Tex Gas Division Addition 080.78404 37602 253,855
080 190 - Mid-Tex Gas Division Addition 080.78404 38000 63,464
080 190 - Mid-Tex Gas Division Addition 080.78415 37602 (7,158)
080 190 - Mid-Tex Gas Division Addition 080.78416 37602 (37,131)
080 190 - Mid-Tex Gas Division Addition 080.78416 38000 (1,954)
080 190 - Mid-Tex Gas Division Addition 080.78424 37602 939
080 190 - Mid-Tex Gas Division Addition 080.78429 37602 205,944
080 190 - Mid-Tex Gas Division Addition 080.78431 39400 2,816
080 190 - Mid-Tex Gas Division Addition 080.78432 39400 2,736
080 190 - Mid-Tex Gas Division Addition 080.78434 39400 5,737
080 190 - Mid-Tex Gas Division Addition 080.78444 37602 318,847
080 190 - Mid-Tex Gas Division Addition 080.78444 38000 79,712
080 190 - Mid-Tex Gas Division Addition 080.78445 37602 143,509
080 190 - Mid-Tex Gas Division Addition 080.78445 38000 35,877
080 190 - Mid-Tex Gas Division Addition 080.78448 37602 207,976
080 190 - Mid-Tex Gas Division Addition 080.78448 38000 51,994
080 190 - Mid-Tex Gas Division Addition 080.78450 37602 138,012
080 190 - Mid-Tex Gas Division Addition 080.78456 37602 531,930
080 190 - Mid-Tex Gas Division Addition 080.78464 37602 148,367
080 190 - Mid-Tex Gas Division Addition 080.78464 38000 37,092
080 190 - Mid-Tex Gas Division Addition 080.78466 37602 24,955
080 190 - Mid-Tex Gas Division Addition 080.78466 38000 1
080 190 - Mid-Tex Gas Division Addition 080.78472 37601 3,422,012
080 190 - Mid-Tex Gas Division Addition 080.78475 39000 12,053
080 190 - Mid-Tex Gas Division Addition 080.78490 37602 3,487
080 190 - Mid-Tex Gas Division Addition 080.78506 37602 375,404
080 190 - Mid-Tex Gas Division Addition 080.78506 38000 41,712
080 190 - Mid-Tex Gas Division Addition 080.78508 37602 171,150
080 190 - Mid-Tex Gas Division Addition 080.78508 38000 19,017
080 190 - Mid-Tex Gas Division Addition 080.78509 37602 408,282
080 190 - Mid-Tex Gas Division Addition 080.78509 38000 102,070
080 190 - Mid-Tex Gas Division Addition 080.78513 37602 22,770
080 190 - Mid-Tex Gas Division Addition 080.78519 37602 3,354
080 190 - Mid-Tex Gas Division Addition 080.78522 39400 8,371
080 190 - Mid-Tex Gas Division Addition 080.78524 37602 7,863
080 190 - Mid-Tex Gas Division Addition 080.78526 37602 (67,846)
080 190 - Mid-Tex Gas Division Addition 080.78526 38000 (3,571)
080 190 - Mid-Tex Gas Division Addition 080.78528 37602 60,472
080 190 - Mid-Tex Gas Division Addition 080.78528 37800 90,709
080 190 - Mid-Tex Gas Division Addition 080.78530 37601 277,342
080 190 - Mid-Tex Gas Division Addition 080.78536 39400 16,280
080 190 - Mid-Tex Gas Division Addition 080.78545 37602 7,841
080 190 - Mid-Tex Gas Division Addition 080.78545 38000 6,723
080 190 - Mid-Tex Gas Division Addition 080.78550 39400 4,175
080 190 - Mid-Tex Gas Division Addition 080.78556 39400 4,462
080 190 - Mid-Tex Gas Division Addition 080.78558 37602 6,855
080 190 - Mid-Tex Gas Division Addition 080.78559 37602 22,477
080 190 - Mid-Tex Gas Division Addition 080.78560 37602 4,841
080 190 - Mid-Tex Gas Division Addition 080.78570 37602 162,225
080 190 - Mid-Tex Gas Division Addition 080.78570 38000 28,628
080 190 - Mid-Tex Gas Division Addition 080.78581 37602 94,445
080 190 - Mid-Tex Gas Division Addition 080.78581 38000 8,213
080 190 - Mid-Tex Gas Division Addition 080.78586 37602 22,625
080 190 - Mid-Tex Gas Division Addition 080.78586 38000 462
080 190 - Mid-Tex Gas Division Addition 080.78588 39400 3,229
080 190 - Mid-Tex Gas Division Addition 080.78589 37602 465,063
080 190 - Mid-Tex Gas Division Addition 080.78589 38000 116,266
080 190 - Mid-Tex Gas Division Addition 080.78595 37602 6,825
080 190 - Mid-Tex Gas Division Addition 080.78595 38000 758
080 190 - Mid-Tex Gas Division Addition 080.78607 37602 407
080 190 - Mid-Tex Gas Division Addition 080.78608 37602 222,560
080 190 - Mid-Tex Gas Division Addition 080.78608 38000 24,729
080 190 - Mid-Tex Gas Division Addition 080.78609 37602 26,452
080 190 - Mid-Tex Gas Division Addition 080.78613 37602 279,535
080 190 - Mid-Tex Gas Division Addition 080.78613 38000 186,357
080 190 - Mid-Tex Gas Division Addition 080.78615 37602 13,125
080 190 - Mid-Tex Gas Division Addition 080.78618 37602 61,137
080 190 - Mid-Tex Gas Division Addition 080.78621 37602 67,561
080 190 - Mid-Tex Gas Division Addition 080.78621 38000 7,507
080 190 - Mid-Tex Gas Division Addition 080.78622 37602 272,046
080 190 - Mid-Tex Gas Division Addition 080.78622 38000 213,102
080 190 - Mid-Tex Gas Division Addition 080.78629 37602 175,529
080 190 - Mid-Tex Gas Division Addition 080.78630 37601 12,787
080 190 - Mid-Tex Gas Division Addition 080.78630 37800 9,836
080 190 - Mid-Tex Gas Division Addition 080.78630 37900 1,967
080 190 - Mid-Tex Gas Division Addition 080.78634 37602 190,478
080 190 - Mid-Tex Gas Division Addition 080.78647 37602 34,618
080 190 - Mid-Tex Gas Division Addition 080.78648 37602 38,108
080 190 - Mid-Tex Gas Division Addition 080.78649 37602 466,349
080 190 - Mid-Tex Gas Division Addition 080.78649 38000 24,545
080 190 - Mid-Tex Gas Division Addition 080.78658 37602 (16,904)
080 190 - Mid-Tex Gas Division Addition 080.78659 37602 162,234
080 190 - Mid-Tex Gas Division Addition 080.78665 37602 369,360
080 190 - Mid-Tex Gas Division Addition 080.78668 37602 192,647
080 190 - Mid-Tex Gas Division Addition 080.78668 38000 10,139
080 190 - Mid-Tex Gas Division Addition 080.78676 37602 5,045
080 190 - Mid-Tex Gas Division Addition 080.78677 37602 48,475
080 190 - Mid-Tex Gas Division Addition 080.78677 38000 16,158
080 190 - Mid-Tex Gas Division Addition 080.78678 37602 84,104
080 190 - Mid-Tex Gas Division Addition 080.78691 37602 33,303
080 190 - Mid-Tex Gas Division Addition 080.78697 37602 654,132
080 190 - Mid-Tex Gas Division Addition 080.78705 37602 1,207,358
MTX Additions by FERC
Page 99 of 101
497
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.78708 37602 2,648
080 190 - Mid-Tex Gas Division Addition 080.78709 37602 3,322
080 190 - Mid-Tex Gas Division Addition 080.78713 37602 284,591
080 190 - Mid-Tex Gas Division Addition 080.78713 38000 121,968
080 190 - Mid-Tex Gas Division Addition 080.78720 37602 521,040
080 190 - Mid-Tex Gas Division Addition 080.78727 39400 19,193
080 190 - Mid-Tex Gas Division Addition 080.78728 37602 8,797
080 190 - Mid-Tex Gas Division Addition 080.78732 37602 18,057
080 190 - Mid-Tex Gas Division Addition 080.78739 37602 38,820
080 190 - Mid-Tex Gas Division Addition 080.78741 37800 94,917
080 190 - Mid-Tex Gas Division Addition 080.78744 37602 15,050
080 190 - Mid-Tex Gas Division Addition 080.78757 37601 532,139
080 190 - Mid-Tex Gas Division Addition 080.78769 39400 1,543
080 190 - Mid-Tex Gas Division Addition 080.78781 37800 7,006
080 190 - Mid-Tex Gas Division Addition 080.78797 37602 306,546
080 190 - Mid-Tex Gas Division Addition 080.78806 37602 20,879
080 190 - Mid-Tex Gas Division Addition 080.78810 37602 14,981
080 190 - Mid-Tex Gas Division Addition 080.78823 37602 84,534
080 190 - Mid-Tex Gas Division Addition 080.78825 37602 121,554
080 190 - Mid-Tex Gas Division Addition 080.78831 37602 117,627
080 190 - Mid-Tex Gas Division Addition 080.78831 38000 13,069
080 190 - Mid-Tex Gas Division Addition 080.78832 37602 82,160
080 190 - Mid-Tex Gas Division Addition 080.78847 39400 17,190
080 190 - Mid-Tex Gas Division Addition 080.78849 37601 229,744
080 190 - Mid-Tex Gas Division Addition 080.78865 37602 121,778
080 190 - Mid-Tex Gas Division Addition 080.78867 37602 110,189
080 190 - Mid-Tex Gas Division Addition 080.78868 39000 28,153
080 190 - Mid-Tex Gas Division Addition 080.78872 37602 41,455
080 190 - Mid-Tex Gas Division Addition 080.78877 37602 203,255
080 190 - Mid-Tex Gas Division Addition 080.78877 38000 22,584
080 190 - Mid-Tex Gas Division Addition 080.78890 39000 286,349
080 190 - Mid-Tex Gas Division Addition 080.78892 37602 266,563
080 190 - Mid-Tex Gas Division Addition 080.78892 38000 14,030
080 190 - Mid-Tex Gas Division Addition 080.78895 37800 10,236
080 190 - Mid-Tex Gas Division Addition 080.78896 37800 7,082
080 190 - Mid-Tex Gas Division Addition 080.78898 37602 135,454
080 190 - Mid-Tex Gas Division Addition 080.78898 37800 67,727
080 190 - Mid-Tex Gas Division Addition 080.78898 38000 22,576
080 190 - Mid-Tex Gas Division Addition 080.78906 37602 160,216
080 190 - Mid-Tex Gas Division Addition 080.78916 39000 6,798
080 190 - Mid-Tex Gas Division Addition 080.78926 39000 8,345
080 190 - Mid-Tex Gas Division Addition 080.78937 37601 32,354
080 190 - Mid-Tex Gas Division Addition 080.78957 37602 197,833
080 190 - Mid-Tex Gas Division Addition 080.78957 38000 21,981
080 190 - Mid-Tex Gas Division Addition 080.78966 39000 4,278
080 190 - Mid-Tex Gas Division Addition 080.78971 37602 144,675
080 190 - Mid-Tex Gas Division Addition 080.78971 38000 16,075
080 190 - Mid-Tex Gas Division Addition 080.78977 37602 165,281
080 190 - Mid-Tex Gas Division Addition 080.78977 38000 110,187
080 190 - Mid-Tex Gas Division Addition 080.78978 37602 310,466
080 190 - Mid-Tex Gas Division Addition 080.78978 38000 6,336
080 190 - Mid-Tex Gas Division Addition 080.78979 37602 213,358
080 190 - Mid-Tex Gas Division Addition 080.78979 38000 16,059
080 190 - Mid-Tex Gas Division Addition 080.78981 37602 264,149
080 190 - Mid-Tex Gas Division Addition 080.78983 37602 78,139
080 190 - Mid-Tex Gas Division Addition 080.78983 38000 4,113
080 190 - Mid-Tex Gas Division Addition 080.78992 37602 146,354
080 190 - Mid-Tex Gas Division Addition 080.78992 38000 16,262
080 190 - Mid-Tex Gas Division Addition 080.79000 37602 252,247
080 190 - Mid-Tex Gas Division Addition 080.79001 37602 48,022
080 190 - Mid-Tex Gas Division Addition 080.79001 38000 2,527
080 190 - Mid-Tex Gas Division Addition 080.79002 37602 33,947
080 190 - Mid-Tex Gas Division Addition 080.79004 37602 64,537
080 190 - Mid-Tex Gas Division Addition 080.79004 38000 7,171
080 190 - Mid-Tex Gas Division Addition 080.79005 37602 2,711
080 190 - Mid-Tex Gas Division Addition 080.79011 37602 29,740
080 190 - Mid-Tex Gas Division Addition 080.79012 37602 -
080 190 - Mid-Tex Gas Division Addition 080.79022 39100 4,919
080 190 - Mid-Tex Gas Division Addition 080.79023 37602 191,085
080 190 - Mid-Tex Gas Division Addition 080.79034 39400 28,419
080 190 - Mid-Tex Gas Division Addition 080.79037 37800 13,351
080 190 - Mid-Tex Gas Division Addition 080.79039 37602 101,783
080 190 - Mid-Tex Gas Division Addition 080.79064 38000 122,872
080 190 - Mid-Tex Gas Division Addition 080.79065 37602 26,187
080 190 - Mid-Tex Gas Division Addition 080.79068 38000 (72,712)
080 190 - Mid-Tex Gas Division Addition 080.79072 37602 80,064
080 190 - Mid-Tex Gas Division Addition 080.79073 37602 21,711
080 190 - Mid-Tex Gas Division Addition 080.79077 37602 4,949
080 190 - Mid-Tex Gas Division Addition 080.79081 38000 7,302
080 190 - Mid-Tex Gas Division Addition 080.79083 37601 39,572
080 190 - Mid-Tex Gas Division Addition 080.79117 37602 28,734
080 190 - Mid-Tex Gas Division Addition 080.79126 37602 821,542
080 190 - Mid-Tex Gas Division Addition 080.79126 38000 43,239
080 190 - Mid-Tex Gas Division Addition 080.79130 37602 70,022
080 190 - Mid-Tex Gas Division Addition 080.79137 37602 81,928
080 190 - Mid-Tex Gas Division Addition 080.79137 37800 44,115
080 190 - Mid-Tex Gas Division Addition 080.79150 37602 124,497
080 190 - Mid-Tex Gas Division Addition 080.79150 38000 13,833
080 190 - Mid-Tex Gas Division Addition 080.79156 37602 17,482
080 190 - Mid-Tex Gas Division Addition 080.79159 37602 167,114
080 190 - Mid-Tex Gas Division Addition 080.79159 37800 71,620
080 190 - Mid-Tex Gas Division Addition 080.79161 37602 15,312
080 190 - Mid-Tex Gas Division Addition 080.79177 37602 93,025
080 190 - Mid-Tex Gas Division Addition 080.79180 37600 85,296
080 190 - Mid-Tex Gas Division Addition 080.79180 37601 36,556
080 190 - Mid-Tex Gas Division Addition 080.79183 37602 19,541
080 190 - Mid-Tex Gas Division Addition 080.79184 37602 135,654
080 190 - Mid-Tex Gas Division Addition 080.79184 38000 7,139
080 190 - Mid-Tex Gas Division Addition 080.79187 37602 68,505
080 190 - Mid-Tex Gas Division Addition 080.79209 37602 63,694
080 190 - Mid-Tex Gas Division Addition 080.79217 37602 3,733
080 190 - Mid-Tex Gas Division Addition 080.79219 37602 4,365
080 190 - Mid-Tex Gas Division Addition 080.79220 39000 23,320
080 190 - Mid-Tex Gas Division Addition 080.79226 37602 42,482
080 190 - Mid-Tex Gas Division Addition 080.79226 38000 22,875
080 190 - Mid-Tex Gas Division Addition 080.79228 37602 78,032
080 190 - Mid-Tex Gas Division Addition 080.79228 38000 4,107
MTX Additions by FERC
Page 100 of 101
498
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Addition 080.79253 37800 3,570
080 190 - Mid-Tex Gas Division Addition 080.79276 39400 2,788
080 190 - Mid-Tex Gas Division Addition 080.79280 37602 215,851
080 190 - Mid-Tex Gas Division Addition 080.79288 37602 846
080 190 - Mid-Tex Gas Division Addition 080.79331 39400 28,932
080 190 - Mid-Tex Gas Division Addition 080.79354 37602 -
080 190 - Mid-Tex Gas Division Addition 080.79371 37601 629,660
080 190 - Mid-Tex Gas Division Addition 080.79374 37602 157,293
080 190 - Mid-Tex Gas Division Addition 080.79374 38000 23,504
080 190 - Mid-Tex Gas Division Addition 080.79388 37602 40,569
080 190 - Mid-Tex Gas Division Addition 080.79409 37602 92,098
080 190 - Mid-Tex Gas Division Addition 080.79411 37602 612,036
080 190 - Mid-Tex Gas Division Addition 080.79411 38000 25,502
080 190 - Mid-Tex Gas Division Addition 080.79421 37602 12,900
080 190 - Mid-Tex Gas Division Addition 080.79421 38000 130
080 190 - Mid-Tex Gas Division Addition 080.79424 37602 188,912
080 190 - Mid-Tex Gas Division Addition 080.79424 38000 47,228
080 190 - Mid-Tex Gas Division Addition 080.79433 37602 8,893
080 190 - Mid-Tex Gas Division Addition 080.79440 37602 123,182
080 190 - Mid-Tex Gas Division Addition 080.79446 37602 65,372
080 190 - Mid-Tex Gas Division Addition 080.79485 37800 7,605
080 190 - Mid-Tex Gas Division Addition 080.79489 37602 3,016
080 190 - Mid-Tex Gas Division Addition 080.79518 37602 27,803
080 190 - Mid-Tex Gas Division Addition 080.79519 39400 16,908
080 190 - Mid-Tex Gas Division Addition 080.79524 37602 35,336
080 190 - Mid-Tex Gas Division Addition 080.79529 37602 39,436
080 190 - Mid-Tex Gas Division Addition 080.79529 37800 26,291
080 190 - Mid-Tex Gas Division Addition 080.79546 37602 63,824
080 190 - Mid-Tex Gas Division Addition 080.79546 38000 645
080 190 - Mid-Tex Gas Division Addition 080.79551 37602 33,894
080 190 - Mid-Tex Gas Division Addition 080.79553 39000 230,837
080 190 - Mid-Tex Gas Division Addition 080.79557 37602 93,258
080 190 - Mid-Tex Gas Division Addition 080.79557 38000 4,908
080 190 - Mid-Tex Gas Division Addition 080.79565 37602 89,566
080 190 - Mid-Tex Gas Division Addition 080.79565 38000 15,806
080 190 - Mid-Tex Gas Division Addition 080.79573 37602 61,896
080 190 - Mid-Tex Gas Division Addition 080.79575 37602 97,958
080 190 - Mid-Tex Gas Division Addition 080.79617 37602 32,219
080 190 - Mid-Tex Gas Division Addition 080.79617 37800 75,178
080 190 - Mid-Tex Gas Division Addition 080.79655 37602 13,490
080 190 - Mid-Tex Gas Division Addition 080.79657 37602 5,458
080 190 - Mid-Tex Gas Division Addition 080.79694 39400 9,068
080 190 - Mid-Tex Gas Division Addition 080.79704 37800 5,325
080 190 - Mid-Tex Gas Division Addition 080.79706 37602 162,205
080 190 - Mid-Tex Gas Division Addition 080.79706 38000 8,537
080 190 - Mid-Tex Gas Division Addition 080.79727 37602 40,606
080 190 - Mid-Tex Gas Division Addition 080.79731 37601 144,327
080 190 - Mid-Tex Gas Division Addition 080.79744 37602 79,855
080 190 - Mid-Tex Gas Division Addition 080.79744 38000 4,203
080 190 - Mid-Tex Gas Division Addition 080.79772 39906 2,835
080 190 - Mid-Tex Gas Division Addition 080.79781 37602 77,198
080 190 - Mid-Tex Gas Division Addition 080.79781 38000 13,623
080 190 - Mid-Tex Gas Division Addition 080.79808 37602 16,245
080 190 - Mid-Tex Gas Division Addition 080.79824 37602 4,256
080 190 - Mid-Tex Gas Division Addition 080.79842 37602 171
080 190 - Mid-Tex Gas Division Addition 080.79842 38000 9
080 190 - Mid-Tex Gas Division Addition 080.79846 37602 22,619
080 190 - Mid-Tex Gas Division Addition 080.79846 37800 137,332
080 190 - Mid-Tex Gas Division Addition 080.79846 38000 1,616
080 190 - Mid-Tex Gas Division Addition 080.79851 37602 22,630
080 190 - Mid-Tex Gas Division Addition 080.79856 37602 550,781
080 190 - Mid-Tex Gas Division Addition 080.79856 38000 28,989
080 190 - Mid-Tex Gas Division Addition 080.79865 39400 1,329
080 190 - Mid-Tex Gas Division Addition 080.79901 37602 22,965
080 190 - Mid-Tex Gas Division Addition 080.79901 38000 1,209
080 190 - Mid-Tex Gas Division Addition 080.79933 37601 564,098
080 190 - Mid-Tex Gas Division Addition 080.79938 37601 2,347
080 190 - Mid-Tex Gas Division Addition 080.79938 38000 587
080 190 - Mid-Tex Gas Division Addition 080.79944 37602 21,901
080 190 - Mid-Tex Gas Division Addition 080.79944 38000 913
080 190 - Mid-Tex Gas Division Addition 080.79963 37602 22,413
080 190 - Mid-Tex Gas Division Addition 080.79982 37602 19,687
080 190 - Mid-Tex Gas Division Addition 080.80084 37602 58,602
080 190 - Mid-Tex Gas Division Addition 080.80088 39000 47,880
080 190 - Mid-Tex Gas Division Addition 080.80121 39906 2,439
080 190 - Mid-Tex Gas Division Addition 080.80169 37602 1,617
080 190 - Mid-Tex Gas Division Addition 080.80174 37602 256,851
080 190 - Mid-Tex Gas Division Addition 080.80302 39400 57,374
080 190 - Mid-Tex Gas Division Addition 080.80369 39000 5,124
080 190 - Mid-Tex Gas Division Addition 080.80448 39000 13,437
Total Mid-Tex Division Additions 1,063,846,551
MTX Additions by FERC
Page 101 of 101
499
Item 10.
ATMOS ENERGY CORP.,
MID-TEX DIVISION
INTERIM RATE ADJUSTMENT
APPLICATION
PROJECT REPORT 2022
RETIREMENTS
500
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
MTX RETIREMENTS
1 080.49148 (117,871)
INSTALL 11,500 FEET OF 24 INCH STEEL ALONG DT3 AT MOCKINGBIRD AND ABANDON
8,895 FEET OF 24 INCH AND 3,900 FEET OF 20 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
2 080.52108 (31,380)
RELOCATE FACILITIES. INSTALL 485 FEET OF 2 INCH POLY AND 6490 FEET OF 6 INCH
POLY; AND 800 FEET OF 10 INCH STEEL CASING ALONG BONNIE BRAE STREET AND
ABANDON 490 FEET OF 2 INCH POLY, 935 FEET OF 4 INCH POLY AND 5,765 FEET OF 4 INCH
STEEL TO ACCOMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY
3 080.54137 (146)
INSTALL 8097 FEET OF 4 INCH POLY ALONG THE STREETS OF QUAIL HOLLOW PHASE 1.
DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WESTLAKE GROWTH
4 080.56871 136
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE
CITY COMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY
5 080.58753 (3,200)
RELOCATE FACILITIES. INSTALL 396 FEET OF 2 INCH, 306 FEET OF 6 INCH, AND 248 FEET
OF 8 INCH POLY AND ABANDON 36 FEET OF 2 INCH POLY, 240 FEET OF 2 INCH, 289 FEET
OF 6 INCH AND 204 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF WAXAHACHIE
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY
6 080.60447 (17,311)
INSTALL 2,000 FEET OF 6 INCH, 40 FEET OF 4 INCH, AND 40 FEET OF 2 INCH POLY AND
DISTRICT REGULATOR STATION #04 ALONG STATE HIGHWAY 114 AND ABANDON 250 FEET
OF 6 INCH, 1,200 FEET OF 4 INCH POLY AND 550 FEET OF 4 INCH STEEL AND DISTRICT
REGULATOR STATION #04.ALL CUSTOMERS SOUTHLAKE SYSTEM IMPROVEMENT
7 080.61247 (17,437)
RELOCATE FACILITIES. INSTALL 2,187 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY AND
ABANDON 140 FEET OF 6 INCH, 2,045 FEET OF 4 INCH, 30 FEET OF 3 INCH AND 2,150 FEET
OF 2 INCH STEEL TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES
8 080.61594 (3,924,367)
DALLAS CAST IRON REPLACEMENT FUNCTIONAL PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
9 080.61595 (451,919)
FUNCTIONAL FORT WORTH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
10 080.62093 514
RELOCATE FACILITIES. INSTALL 402 FEET OF 6 INCH POLY, 2,226 FEET OF 4 INCH POLY, 10
FEET OF 2 INCH POLY AND ABANDON 328 FEET OF 4 INCH POLY AND 20 FEET OF 2 INCH
STEEL TO ACCOMMODATE CITY OF SANGER PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER RELOCATION OF FACILITIES
11 080.62714 30,854
RELOCATE FACILITIES. INSTALL 1011 FEET OF 4 INCH AND 989 FEET OF 6 INCH POLY
ALONG FM 2818 AND ABANDON 238 FEET OF 4 INCH AND 500 FEET OF 6 INCH POLY AND
219 FEET OF 4 INCH AND 728 FEET OF 6 INCH STEEL TO ACCOMMODATE TXDOT HIGHWAY
IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE
8.209.ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY
12 080.62738 (477,471)
RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH, 809 FEET OF 4 INCH AND 2996 FEET
OF 6 INCH POLY ALONG EAST ELM STREET AND ABANDON 781 FEET OF 3 INCH AND 470
FEET OF 4 INCH AND 1680 FEET OF 6 INCH STEEL AND 1380 FEET OF 4 INCH AND 500 FEET
OF 6 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY
13 080.63644 (100,921)
INSTALL 9504 FEET OF 10 INCH STEEL ALONG ALONG NORTH AIRFIELD DRIVE AND
ABANDON 8500 FEET OF 10 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY
14 080.63945 (44,897)
RELOCATE FACILITIES. INSTALL 1265 FEET OF 6 INCH AND 450 FEET OF 2 INCH POLY, 200
FEET OF 10 INCH STEEL CASING AND DISTRICT REGULATOR STATION #009 ALONG
NORTHEAST MAIN AND ABAONDON 1265 FEET OF 6 INCH STEEL AND 2 DRSS TO
ACCOMODATE THE CITY OF ENNIS IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS ENNIS SYSTEM INTEGRITY
15 080.64366 1,302
RELOCATE FACILITIES. INSTALL NEW DRS ON TUCASA ST. AND ABANDON 330 FEET OF 8
INCH STEEL, 481 FEET OF 6 INCH STEEL AND 500 FEET OF 4 INCH IP PE ALONG
GRAUWYLER RD. TO ACCOMMODATE TX-DOT CAPITAL HIGHWAY PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES
16 080.64399 (7,123)
RELOCATE FACILITIES. INSTALL 2,775 FEET OF 4 INCH POLY ALONG RED BIRD MALL AND
ABANDON 1,750 FEET OF 2 INCH AND 1,060 FEET OF 4 INCH POLY TO ACCOMMODATE
NEW CONSTRUCTION.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
17 080.65103 (634,423)
RELOCATE FACILITIES. INSTALL 837 FEET OF 12 INCH AND 881 FEET OF 20 INCH STEEL
ALONG MAIN STREET IN FORT WORTH AND ABANDON 269 FEET OF 12 INCH AND 244 FEET
OF 18 INCH STEEL TO ACCOMODATE BNSF RAILWAY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
18 080.65275 1,827
RELOCATE FACILITIES. INSTALL 2780 FEET OF 4 INCH POLY AND 250 FEET OF 4 INCH
STEEL AND 300 FEET OF 2 INCH POLY ALONG SH 205 AND ABANDON 2775 FEET OF 2 INCH
POLY TO ACCOMMODATE TXDOT IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAVON RELOCATION OF FACILITIES
19 080.65516 (977)
INSTALL DISTRICT REGULATOR STATION 012 IN CISCO, 01 IN MORAN, 02 IN CLYDE, 02 IN
TRENT AND 02 IN CARBON AND ABANDON DISTRICT REGULATOR STATION 012 IN CISCO,
01 IN MORAN, 02 IN CLYDE, 02 IN TRENT AND 02 IN CARBON IN ACCORDANCE WITH TEXAS
RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS CARBON SYSTEM INTEGRITY
20 080.65651 (298)
INSTALL AND ABANDON S203 DRS IN THE FOLLOWING LOCATIONS: DRS03 IN
WHITEWRIGHT, DRS02 IN LINDSAY, AND DRS10 IN GAINESVILLE IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LINDSAY SYSTEM INTEGRITY
21 080.65674 (22,556)
INSTALL TWO NEW LOW PRESSURE DISTRICT REGULATOR STATIONS, 25 FEET OF 2 INCH,
40 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATIONS
FARMERSVILLE DISTRICT REGULATOR STATIONS 11 AND 12, 22 FEET OF 2 INCH STEEL ,
13 FEET OF 4 INCH STEEL 10 FEET OF 4 INCH POLY AND 13 FEET OF 4 INCH STEEL MAIN
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY
22 080.65697 (10)
REPLACE (4) DISTRICT REGUATOR STATIONS IN SAGINAW IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY
23 080.65704 (1,900)
INSTALL NEVADA DISTRICT REGULATOR STATION #2, FATE DISTRICT REGULATOR
STATION #1 AND FORNEY DISTRICT REGULATOR STATION #6. REPLACE NEVADA
DISTRICT REGULATOR STATION #2, FATE DISTRICT REGULATOR STATION #1 AND FORNEY
DISTRICT REGULATOR STATION #6 ALL CUSTOMERS NEVADA SYSTEM INTEGRITY
24 080.65744 (146,628)
INSTALL DISTRICT REGULATOR STATIONS #010, #011, #017, AND #067A ALONG THE
STREETS OF ABILENE AND ABANDON DISTRICT REGULATOR STATIONS #010, #011, #017,
AND #067A.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
25 080.65795 (3,440)
INSTALL 1500 FEET OF 2 INCH; POLY ALONG IOOF STREET AND ABANDON 1020 FEET OF 3
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY
26 080.65805 (16,339)
INSTALL WESTMINISTER DISTRICT REGULATOR STATION # 1, ANNA DISTRICT REGULATOR
STATION #3, ANNA DISTRICT REGULATOR STATION #5, 30 FEET OF 2 INCH POLY, 70 FEET
OF 4 INCH POLY AND ABANDON WESTMINISTER DISTRICT REGULATOR STATION #1, ANNA
DISTRICT REGULATOR STATION #3, ANNA DISTRICT REGULATOR STATION #5, 28 FEET OF
2 INCH STEEL, 10 FEET OF 3 INCH STEEL, 19 FEET OF 4 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANNA SYSTEM INTEGRITY
27 080.65807 683
INSTALL DISTRICT REGULATOR STATIONS 01,02,03,10 AND ABANDON FOUR DISTRICT
REGULATOR STATIONS 01,02,03,10 ALONG THE STREETS OF PALESTINE IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE SYSTEM INTEGRITY
28 080.65821 (3,016)
INSTALL DISTRICT REGULATOR STATION 07, 11 12 AND ABANDON DISTRICT REGULATOR
STATION 07, 11, 12 ALONG THE STREETS OF DENTON IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY
29 080.65842 (10,436)
INSTALL DISTRICT REGULATOR STATION IN GRAPEVINE AND ABANDON DISTRICT
REGULATOR STATION #01, #04, AND #07. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY
30 080.65858 (47,514)
INSTALL DISTRICT REGULATOR STATION #04, #11, #13. #14 ALONG THE STREETS OF SAN
ANGELO AND ABANDON DISTRICT REGULATOR STATION #04, #11, #13. #14 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY
31 080.65862 (16,839)
INSTALL DISTRICT REGULATOR STATION #15, #43, #52. #62, #81 ALONG THE STREETS OF
SAN ANGELO AND ABANDON DISTRICT REGULATOR STATION #15, #43, #52. #62, #81 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY
MTX Retirements
Page 1 of 45
501
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
32 080.65865 (2,084)
INSTALL DISTRICT REGULATOR STATION #20 AND 270 FEET OF 4 INCH POLY ALONG
CHURCH STREET AND ABANDON DISTRICT REGULATOR STATION #20 AND 260 FEET OF 2
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY
33 080.65879 12,878
RELOCATE FACILITIES. INSTALL 2200 FEET OF 4 INCH AND 350 FEET OF 2 INCH POLY
ALONG SH78 AND ABANDON 1190 FEET OF 4 INCH AND 780 FEET OF 6 INCH STEEL TO
ACCOMMODATE TXDOT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
34 080.66044 (102,301)
RELOCATE FACILITIES. INSTALL 1000 FEET OF 30 INCH STEEL ALONG CANADA DRIVE AND
ABANDON 850 FEET OF 30 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
35 080.66262 (4,237)
INSTALL 1487 FEET OF 4 INCH POLY AND ABANDON 158 FEET OF 2 INCH STEEL, 301 FEET
OF 2 INCH POLY, 11 FEET OF 4 INCH POLY ALONG LOVE CIRCLE ACROSS STATE HIGHWAY
199 DUE TO CITY CONFLICT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
36 080.66557 (6,011)
RELOCATE FACILITIES. INSTALL 700 FEET OF 12 INCH STEEL ALONG HIGHWAY 80 AND
ABANDON 700 FEET OF 12 INCH STEEL TO ACCOMODATE UNION PACIFIC BRIDGE
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
37 080.66564 (793)
REPLACE DISTRICT REGULATOR STATION 02 AND 04 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BAIRD SYSTEM INTEGRITY
38 080.66654 (9,561)
INSTALL AND ABANDON DISTRICT REGULATOR STATION #03,09, 14, 17 IN GORMAN IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORMAN SYSTEM INTEGRITY
39 080.66666 (5,532,859)
INSTALL 5,100 FEET OF 16 INCH STEEL OF LINE C16 IN EULESS AND ABANDON 5,100 FEET
OF 16 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS EULESS SYSTEM INTEGRITY
40 080.66673 (446)
INSTALL 300 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY, DRS 18, DRS 26, DRS 30 AND DRS
38 AND ABANDON 50 FEET OF 4 INCH STEEL, 25 FEET OF 3 INCH STEEL, 50 FEET OF 2
INCH POLY, DRS 18, DRS 26, DRS 30, AND DRS 38 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY
41 080.66728 (3,108)
INSTALL DISTRICT REGULATOR STATIONS ALONG STREETS OF STEPHENVILLE AND
ABANDON DISTRCT REGULATOR STATION 01 AND DISTRICT REGULATOR STATION 09 IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY
42 080.66755 (201)
INSTALL 1400 FEET OF 2 INCH POLY ALONG GOWDY STREET AND ABANDON 1340 FEET OF
3 INCH AND 210 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 06 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITEWRIGHT SYSTEM INTEGRITY
43 080.66775 1,724
INSTALL 1600 FEET OF 20 INCH STEEL ALONG SCYENE ROAD AND DIXON AVENUE AND
ABANDON 1600 FEET OF 24 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
44 080.66809 (16,624)
INSTALL 250 FEET OF 6 INCH STEEL ALONG AUTUMN CIRCLE IN COLLEGE STATION AND
ABANDON 250 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY
45 080.67075 (5,826)
ABANDON 1055 FEET OF 3 INCH STEEL AND 4100 FEET OF 3 INCH POLY ALONG STREETS
IN BREEZY OAKS MOBILE HOME PARK IN TARRANT COUNTY MANSFIELD TEXAS. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY
46 080.67347 (136)
RELOCATE FACILITIES. INSTALL 1300 FEET OF 2 INCH POLY ALONG MEADOW CREST
DRIVE AND ABANDON 1300 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS
STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
47 080.67748 (888)
RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH POLY ALONG APRIL HILL ALLEY AND
ABANDON 800 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
48 080.67855 (3,236)
RELOCATE FACILITIES. INSTALL 2699 FEET OF 4 INCH POLY AND ABANDON 2655 FEET OF
4 INCH POLY TO ACCOMODATE TXDOT IMPROVEMENT PROJECT IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LLANO RELOCATION OF FACILITIES
49 080.68373 (38,240)
RELOCATE FACILITIES. INSTALL 600 FEET OF 6-INCH POLY AND ABANDON 1,342 FEET OF 6
INCH POLY AND 221 FEET OF 6 INCH COATED STEEL WITHIN THE ROW OF MUMFORD
ROAD WITHIN THE CITY OF BRYAN, BRAZOS COUNTY DUE TO APT PROJECT. ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES
50 080.68429 639,052
RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH AND 1000 FEET OF 6 INCH POLY AND
800 FEET OF 16 INCH STEEL ALONG CLEBURNE CROWLEY RD TO CAPPS ST AND
ABANDON 300 FEET OF 4 INCH POLY AND 250 FEET OF 6 INCH STEEL AND 120 FEET TO
ACCOMMODATE CITY OF CLEBURNE STREET PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
51 080.68474 (1,187)
INSTALL 1590 FEET OF 2 INCH POLY AND ABANDON 2079 FEET OF 4 INCH STEEL AND 428
FEET OF 4 INCH POLY ALONG DUVAL STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
52 080.68503 (897)
INSTALL 750 FEET OF 2 INCH POLY ALONG CONCH STREET AND ABANDON 750 FEET OF 2
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM SYSTEM INTEGRITY
53 080.68576 (1,839)
RELOCATE FACILITIES. INSTALL 5000 FEET OF 16 INCH STEEL ALONG PIPELINE ROAD AND
ABANDON 5000 FEET OF 16 INCH STEEL TO ACCOMMODATE CITY OF EULESS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS EULESS RELOCATION OF FACILITIES
54 080.68954 (23,690)
INSTALL 40 FEET OF 8 INCH, 80 FEET OF 12 INCH AND 40 FEET OF 20 INCH STEEL AND
DISTRICT REGULATOR STATION ALONG FORD ROAD AND ABANDON 120 FEET OF 12 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
55 080.69221 (90,255)
RELOCATE FACILITIES. INSTALL 3,226 FEET OF 6 INCH AND 2,251 FEET OF 8 INCH POLY,
170 FEET OF 10 INCH AND 160 FEET OF 12 INCH STEEL AND ABANDON 2,151 FEET OF 8
INCH, 3,116 FEET OF 4 INCH POLY DUE TO TXDOT ROAD AND DRAINAGE IMPROVEMENTS
PROJECT IN ROCKWALL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209 ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY
56 080.69341 (4,265)
RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH AND 990 FEET OF 4 INCH POLY
ALONG BUSINESS 78 AND ABANDON 63 FEET OF 1.25 INCH, 45 FEET OF 2 INCH STEEL, 930
FEET OF 4 INCH STEEL AND 27 FEET OF 4 INCH POLY TO ACCOMMODATE FARMERSVILLE
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS FARMERSVILLE RELOCATION OF FACILITIES
57 080.69404 (1,003)
RELOCATE FACILITIES. INSTALL 830 FEET OF 4 INCH POLY AND ABANDON 680 FEET OF 4
INCH AND 140 FEET OF 2 INCH POLY ALONG LBJ TO ACCOMMODATE TXDOT PROJECT. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES
58 080.69414 (1,854)
RELOCATE FACILITIES. INSTALL 110 FEET OF 4 INCH POLY AND ABANDON 105 FEET OF 4
INCH POLY ALONG GALLOWAY AVENUE TO ACCOMMODATE STORM DRAIN TXDOT
PROJECT.ALL CUSTOMERS MESQUITE RELOCATION OF FACILITIES
59 080.69599 (51)
INSTALL DISTRICT REGULATOR STATION 49 ALONG THE STREETS OF N 42ND STREET AND
SANGER STREET IN WACO AND ABANDON DISTRICT REGULATOR STATION 49 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS WACO SYSTEM INTEGRITY
60 080.69629 759
RELOCATE FACILITIES. INSTALL 314 FEET OF 6 INCH POLY AND ABANDON 294 FEET OF 6
INCH POLY ALONG CUSTER ROAD. ALL CUSTOMERS RICHARDSON RELOCATION OF FACILITIES
61 080.69719 120
RELOCATE FACILITIES. INSTALL 400 FEET OF 6 INCH POLY 4900 FEET OF 4 INCH POLY
ALONG STONEWALL STREET AND ABANDON 175 FEET OF 6 INCH, 1680 FEET OF 4 INCH
STEEL,50 FEET OF 4 INCH POLY, 2865 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF
GREENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY
62 080.69878 493
RELOCATE FACILITIES. INSTALL 540 FEET OF 6 INCH POLY AND ABANDON 530 FEET OF 6
INCH POLY ALONG LEGACY DRIVE TO ACCOMMODATE TRAMMELL CROWS TURN LANE
EXTENSION.ALL CUSTOMERS PLANO RELOCATION OF FACILITIES
63 080.69932 (783)
INSTALL 799 FEET OF 4 INCH AND 183 FEET OF 2 INCH POLY AND ABANDON 740 FEET OF 3
INCH AND 228 FEET OF 2 INCH POLY ALONG PLANO PARKWAY. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES
64 080.70046 (12,971)
RELOCATE FACILITIES. INSTALL 1300 FEET OF 2 INCH POLY ALONG RYANRIDGE STREET
AND ABANDON 1300 FEET OF 2 INCH STEEL TO ACCOMODATE THE CITY OF DALLAS
STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
65 080.70161 (536)
RELOCATE FACILITIES. INSTALL 251 FEET OF 2 INCH POLY AND ABANDON 243 FEET OF 2
INCH STEEL TO ACCOMMODATE DART RAIL PROJECT. ALL CUSTOMERS ADDISON RELOCATION OF FACILITIES
MTX Retirements
Page 2 of 45
502
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
66 080.70193 (5,431)
REPLACE AMLD MAINS 5 TO 250 IN THE NORTH EAST REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
67 080.70194 (162,015)
REPLACE AMLD MAINS 5 TO 250 IN THE NORTH CENTRAL REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY
68 080.70195 (492,465)
REPLACE AMLD MAINS 5 TO 250 IN THE NORTH WEST REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD SYSTEM INTEGRITY
69 080.70196 (71,465)
REPLACE AMLD MAINS 5 TO 250 IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
70 080.70197 (2,271)
REPLACE AMLD MAINS 5 TO 250 IN THE SOUTH EAST REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
71 080.70198 (493)
REPLACE AMLD MAINS 5 TO 250 IN THE SOUTH WEST REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY
72 080.70199 (1,606)
REPLACE AMLD MAINS 5 TO 250 IN THE WEST FORT WORTH REGION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
73 080.70200 (1,945)
REPLACE AMLD MAINS 5 TO 250 IN THE WEST ARLINGTON IRVING REGION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
74 080.70201 (43,303)
REPLACE AMLD MAINS 5 TO 250 IN THE WEST WEST REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
75 080.70202 (55,398)
REPLACE AMLD SERVICE LINES IN THE NORTH EAST REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY
76 080.70203 (195,109)
REPLACE SERVICE LINES IN WICHITA FALLS IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
77 080.70204 (138,106)
REPLACE SERVICE LINES IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
78 080.70205 (37,376)
REPLACE SERVICE LINES IN MCKINNEY IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY
79 080.70206 (48,162)
REPLACE SERVICE LINES IN WACO IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY
80 080.70207 (4,691)
REPLACE SERVICE LINES IN FORT WORTH IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
81 080.70208 (23,295)
REPLACE SERVICE LINES IN ARLINGTON IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
82 080.70209 (4,599)
REPLACE SERVICE LINES IN ROUND ROCK IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY
83 080.70210 (134,626)
REPLACE SERVICE LINES IN ABILENE IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
84 080.70211 (2,556)
REPLACE MAIN 5-250' IN THE NORTH EAST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY
85 080.70212 (59,812)
REPLACE MAIN 5-250' IN THE NORTH CENTRAL REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY
86 080.70213 (18,394)
REPLACE MAIN 5-250' IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD SYSTEM INTEGRITY
87 080.70214 (14,285)
REPLACE MAIN 5-250' IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
88 080.70215 (223)
REPLACE MAIN 5-250' IN THE SOUTH EAST REGION DUE TO HIGH RISK DETERMINATION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
89 080.70216 (196)
REPLACE MAIN 5-250' IN THE SOUTH WEST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY
90 080.70217 (111,070)
REPLACE MAIN 5-250' IN THE WEST FORT WORTH REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
91 080.70218 (1,532)
REPLACE MAIN 5-250' IN THE WEST ARLINGTON IRVING REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
92 080.70219 (33,749)
REPLACE MAIN 5-250' IN THE WEST WEST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY
93 080.70220 (150,221)
REPLACE SERVICE LINES IN THE NORTH EAST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY
94 080.70221 (110,564)
REPLACE SERVICE LINES IN THE NORTH CENTRAL REGION ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY
95 080.70222 (196,314)
REPLACE SERVICE LINES IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD SYSTEM INTEGRITY
96 080.70223 (562,015)
REPLACE SERVICE LINES IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY
97 080.70224 (180,808)
REPLACE SERVICE LINES IN THE SOUTH EAST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY
98 080.70225 (47,411)
REPLACE SERVICE LINES IN THE SOUTH WEST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY
99 080.70226 (180,865)
REPLACE SERVICE LINES IN THE WEST FORT WORTH REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
100 080.70227 (73,608)
REPLACE SERVICE LINES IN THE WEST ARLINGTON IRVING REGION IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY
101 080.70228 (137,189)
REPLACE SERVICE LINES IN THE WEST WEST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
102 080.70229 (1,569,059)
REPLACE METERS IN THE NORTH EAST REGION DUE TO HIGH RISK DETERMINATION IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY
103 080.70230 (2,144,142)
REPLACE METERS IN THE NORTH CENTRAL REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY
104 080.70231 (1,135,191)
REPLACE METERS IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
105 080.70232 (2,667,755)
REPLACE METERS IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE SYSTEM INTEGRITY
106 080.70233 (2,537,569)
REPLACE METERS IN THE SOUTH EAST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
107 080.70234 (880,360)
REPLACE METERS IN THE SOUTH WEST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY
108 080.70235 (1,147,222)
REPLACE METERS IN THE WEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
109 080.70236 (860,417)
REPLACE METERS IN THE WEST ARLINGTON IRVING REGION IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
110 080.70237 (1,102,999)
REPLACE METERS IN THE WEST WEST REGION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
111 080.70252 (1,000)
INSTALL 400 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 02 AND
300 FEET OF 2 INCH POLY AND 1331 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLDEN SYSTEM INTEGRITY
112 080.70260 (609)
INSTALL 320 FEET OF 2 INCH POLY AND INSTALL DISTRICT REGULATOR STATION 07,12
AND 23 ALONG W 16TH STREET AND ABANDON 540 FEET OF 2 INCH STEEL, 130 FEET OF 2
INCH POLY, 14 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION 07, 12, AND 23
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY
113 080.70307 (81,264) REPLACE SERVICE LINES IN THE NORTH EAST DISTRICT. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
114 080.70308 (68,160) NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN NORTH CENTRAL DISTRICT. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY
115 080.70309 (93,308) NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN NORTH WEST DISTRICT. ALL CUSTOMERS BOYD SYSTEM INTEGRITY
116 080.70310 (468,571) NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN SOUTH DALLAS. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
117 080.70311 (219,107) NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN SOUTH EAST DISTRICT. ALL CUSTOMERS WACO SYSTEM INTEGRITY
118 080.70312 (77,471) NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN SOUTH WEST DISTRICT. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY
119 080.70313 (104,352) NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN WEST FORT WORTH. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
120 080.70314 (105,846) NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN WEST ARLINGTON IRVING. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
121 080.70315 (71,030) NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN WEST DISTRICT. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
122 080.70316 (4,514) NON GROWTH FUNCTIONAL MAINS IN NORTH EAST. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
123 080.70317 (9,795)
NON GROWTH FUNCTIONAL FOR THE REPLACEMENT OF MAINS IN NORTH CENTRAL
REGION.ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY
124 080.70318 (9,872) NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN NORTH WEST REGION. ALL CUSTOMERS BOYD SYSTEM INTEGRITY
125 080.70319 (6,641) NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN SOUTH DALLAS. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
126 080.70320 (9,306) NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN SOUTH EAST REGION. ALL CUSTOMERS WACO SYSTEM INTEGRITY
MTX Retirements
Page 3 of 45
503
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
127 080.70321 (1,161) NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN SOUTH WEST REGION. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY
128 080.70322 (5,596) NON GROWTH FUNCTIONAL MAINS PROJECT IN WEST FORT WORTH. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
129 080.70323 (3,902)
NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN WEST ARLINGTON
REGION.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
130 080.70324 (2,416) NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN WEST REGION. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
131 080.70325 (280,615)
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN NORTH
EAST REGION.ALL CUSTOMERS GARLAND GROWTH
132 080.70326 (379,231)
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN NORTH
CENTRAL REGION.ALL CUSTOMERS MCKINNEY GROWTH
133 080.70327 (362,678)
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN NORTH
WEST REGION.ALL CUSTOMERS BOYD GROWTH
134 080.70328 (565,784)
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN SOUTH
DALLAS REGION.ALL CUSTOMERS DALLAS GROWTH
135 080.70329 (842,124)
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN SOUTH
EAST REGION.ALL CUSTOMERS WACO GROWTH
136 080.70330 (158,587)
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN SOUTH
WEST REGION.ALL CUSTOMERS ROUND ROCK GROWTH
137 080.70331 (386,405)
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN WEST FORT
WORTH REGION.ALL CUSTOMERS FORT WORTH GROWTH
138 080.70332 (307,919)
GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN WEST
ARLINGTON REGION.ALL CUSTOMERS ARLINGTON GROWTH
139 080.70333 (440,710) NON GROWTH FUNCTIONAL METERS IN WEST DISTRICT. ALL CUSTOMERS ABILENE GROWTH
140 080.70515 2,474
RELOCATE FACILITIES. INSTALL 2200 FEET OF 4 INCH POLY AND 900 FEET OF 2 INCH
POLY ALONG CLAYTON ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
141 080.70526 (72)
INSTALL DISTRICT REGULATOR STATION 06 ALONG ALONG 2ND STREET AND DISTRICT
REGULATOR STATION 06 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS QUANAH SYSTEM INTEGRITY
142 080.70527 36
INSTALL DISTRICT REGULATOR STATION 12 ALONG STARR STREET AND ABANDON
DISTRICT REGULATOR STATION 12 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS QUANAH SYSTEM INTEGRITY
143 080.70534 (255)
INSTALL 50 FEET OF 2 INCH POLY, 120 FEET OF 4 INCH POLY, 175 FEET OF 6 INCH POLY,
DISTRICT REGULATOR STATION 08 ALONG 4TH STREET NE AND ABANDON 230 FEET OF 8
INCH STEEL, 25 FEET OF 6 INCH STEEL, 10 FEET OF 4 INCH STEEL, AND 80 FEET OF 3 INCH
POLY, DISTRICT REGULATOR STATION 08 IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY
144 080.70540 (263)
INSTALL 40 FEET OF 4 INCH, 30 FEET OF 3 INCH AND 100 FEET OF 6 INCH POLY, DISTRICT
REGULATOR STATION 08 ALONG MORTON STREET AND ABANDON DISTRICT REGULATOR
STATION 08 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY
145 080.70541 163
INSTALL 910 FEET OF 2 INCH POLY AND ABANDON 747 FEET OF 2 INCH STEEL AND DRS 09
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENISON SYSTEM INTEGRITY
146 080.70545 (361)
INSTALL 60 FEET OF 2 INCH POLY, 80 FEET OF 4 INCH POLY, DISTRICT REGULATOR
STATION 03 ALONG GARDNER STREET AND ABANDON 222 FEET OF 3 INCH STEEL, 10
FEET OF 2 INCH STEEL, DISTRICT REGULATOR STATION 03 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITEWRIGHT SYSTEM INTEGRITY
147 080.70548 3,213
INSTALL 2900 FEET OF 2 INCH AND 225 FEET OF 4 INCH POLY AND ABANDON DISTRICT
REGULATOR STATION 02, 700 FEET OF 4 INCH, 2512 FEET OF 3 INCH, AND 44 FEET OF 2
INCH STEEL AND 2 FEET OF 2 INCH AND 100 FEET OF 1.25 INCH POLY ALONG THE
STREETS OF LEONARD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS LEONARD SYSTEM INTEGRITY
148 080.70551 (7,745)
INSTALL 2300 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 05,
683 FEET OF 4 INCH, 2469 FEET OF 3 INCH, AND 301 FEET OF 2 INCH STEEL AND 520 FEET
OF POLY ALONG THE STREETS OF LEONARD IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEONARD SYSTEM INTEGRITY
149 080.70552 (3,626)
INSTALL DISTRICT REGULATOR STATION 01 ALONG GRIMES STREET AND BALLENTINE
STREET AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY
150 080.70553 (1,482)
INSTALL 400 FEET OF 4 INCH POLY, 25 FEET OF 2 INCH POLY, DISTRICT REGULATOR
STATION 04 ALONG AUGUSTUS STREET AND ABANDON 433 FEET OF 2 INCH STEEL,
DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS TRENTON SYSTEM INTEGRITY
151 080.70554 (101)
INSTALL 920 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY ALONG SAUNDERS AND
DISTRICT REGULATOR STATION ON 4TH AND ABANDON 335 FEET OF 3 INCH STEEL AND
DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON SYSTEM INTEGRITY
152 080.70555 (50)
INSTALL 225 FEET OF 4 INCH POLY AND 2970 FEET OF 2 INCH POLY AND ABANDON 1,898
FEET OF 3 INCH STEEL, 553 FEET OF 4 INCH STEEL, 171 FEET OF 3 INCH POLY, 167 FEET
OF 2 INCH POLY, 219 FEET OF 2 INCH STEEL ALONG NW FRONT STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAVOY SYSTEM INTEGRITY
153 080.70564 413
RELOCATE FACILITIES. INSTALL 24 FEET OF 2 INCH POLY, 288 FEET OF 4 INCH POLY AND
1009 FEET OF 6 INCH POLY ALONG HARWOOD ROAD AND ABANDON 14 FEET OF 2 INCH
STEEL, 93 FEET OF 3 INCH STEEL, 88 FEET OF 4 INCH STEEL AND 990 FEET OF 6 INCH
STEEL TO ACCOMMODATE CITY OF EULESS STREET PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY
154 080.70606 (6,652)
RELOCATE FACILITIES. INSTALL 114 FEET OF 4 INCH POLY ALONG NORTH BELL AVENUE
AND ABANDON 475 FEET OF 4 INCH STEEL, 20 FEET OF 3 INCH POLY AND 760 FEET OF 2
INCH POLY TO ACCOMODATE CITY OF DENTON UTILITY AND STREET PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES
155 080.70611 (8,501)
INSTALL DISTRICT REGULATOR STATION #8 AND 460 FEET OF 4 INCH AND 240 FEET OF 4
INCH POLY AND ABANDON DISTRICT REGULATOR STATION #8 AND 41 FEET OF 4 INCH
STEEL AND 24 FEET OF 4 INCH, 132 FEET OF 6 INCH POLY ALONG BAYLOR STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
156 080.70618 (30,875)
INSTALL DISTRICT REGULATOR STATION #66 AND 30 FEET OF 6 INCH POLY AND 250 FEET
OF 6 INCH POLY AND ABANDON DISTRICT REGULATION STATION #66 AND 97 FEET OF 6
INCH POLY ALONG STREET OF WICHITA FALLS IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
157 080.70619 (6,749)
INSTALL DISTRICT REGULATOR STATION #67 AND INSTALL 4 INCH POLY ALONG FILLMORE
STREET AND ABANDON DISTRICT REGULATOR STATION FISHER #S203&NBSP; AND 19
FEET OF 2 INCH STEEL AND 188 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
158 080.70620 (10,460)
INSTALL DISTRICT REGULATOR STATION #83 AND 425 FEET OF 4 INCH, 130 FEET OF 6
INCH POLY AND ABANDON DISTRICT REGULATOR STATION #83, 248 FEET OF 6 INCH
STEEL AND 3 FEET OF 6 INCH POLY ALONG SANTA FE STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
159 080.70643 (66,042)
INSTALL DISTRICT REGULATOR STATION # 17, 30 FEET OF 2 INCH, 225 FEET OF 6 INCH
POLY AND ABANDON DISTRICT REGULATOR STATION #17, 64 FEET OF 2 INCH STEEL AND
139 FEET OF 4 INCH STEEL ALONG FULTON STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY
160 080.70644 (25,487)
INSTALL 2777 FEET OF 2 INCH POLY ALONG BRADSHAW STREET AND ABANDON DISTRICT
REGULATOR STATION 28, 1436 FEET OF 3 INCH POLY AND 1269 OF 3 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY
161 080.70686 (34,630)
RELOCATE FACILITIES. INSTALL 335 FEET OF 4 INCH AND 4356 OF 2 INCH POLY AND
ABANDON 2090 FEET OF 2 INCH AND 1252 FEET OF 3 INCH STEEL, 263 FEET OF 2 INCH,
699 FEET OF 3 INCH AND 128 FEET OF 4 INCH POLY ALONG THE STREETS OF KELLER IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY
162 080.70702 355
RELOCATE FACILITIES. INSTALL 2300 FEET OF 4 INCH POLY ALONG STREETS OF DALLAS
AND ABANDON 2200 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
163 080.70706 (1,528)
ABANDON 276 FEET OF 2 INCH STEEL, 847 FEET OF 2 INCH POLY, 521 FEET OF 1.25 INCH
POLY, 302 FEET OF 1 INCH STEEL, 197 FEET OF 1.25 STEEL, 20 FEET OF 2 INCH STEEL, 27
FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION 05 ALONG WINKLER STREET
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORMAN SYSTEM INTEGRITY
MTX Retirements
Page 4 of 45
504
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
164 080.70735 (146)
RELOCATE FACILITIES. INSTALL 1400 FEET OF 4 INCH POLY, 50 FEET OF 6 INCH POLY, 90
FEET OF 8 INCH POLY AND ABANDON 1400 FEET OF 4 INCH STEEL, 50 FEET OF 6 INCH
STEEL, AND 90 FEET OF 8 STEEL ALONG OVERTON PARK TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
165 080.70810 (12,094)
RELOCATE FACILITIES. INSTALL 4,287 FEET OF 2 INCH POLY AND ABANDON 4,398 FEET OF
2 INCH POLY ALONG FM4 IN CLEBURNE DUE TO ACCOMOCATE TXDOT HIGHWAY
IMPROVEMENTS AND STORM DRAIN EXTENSION IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE RELOCATION OF FACILITIES
166 080.70840 303
RELOCATE FACILITIES. INSTALL 15 FEET OF 2 INCH AND 610 FEET OF 8 INCH POLY ALONG
LIVE OAK AND ABANDON 625 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS
STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
167 080.70855 (1,087)
INSTALL 5,540 FEET OF 6 INCH, 540 FEET OF 4 INCH POLY AND ABANDON 2,500 FEET OF 3
INCH STEEL, 540 FEET OF 4 INCH POLY, 350 FEET OF 8 INCH STEEL ALONG BECKLEY. ALL CUSTOMERS DALLAS SYSTEM IMPROVEMENT
168 080.70903 (205)
INSTALL DISTRICT REGULATOR STATION 013 ALONG HOWARD STREET AND ABANDON
DISTRICT REGULATOR STATION 013 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
169 080.70936 (1,455)
RELOCATE FACILITIES. INSTALL 700 FEET OF 6 INCH POLY AND 132 FEET OF 12 INCH
POLY AND 70 FEET OF 2 INCH POLY AND ABANDON 639 FEET OF 6 INCH POLY AND 80
FEET OF 12 INCH STEEL ALONG OAK GROVE ROAD TO ACCOMMODATE THE CITY OF FORT
WORTH DRAINGE PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
170 080.70954 123
INSTALL 4 INCH METER, 6 INCH REGULATOR AND RELIEF STATION, AND 25 FEET OF 6
INCH STEEL ALONG FOREST PARK ROAD AND ABANDON 25 FEET OF 4 INCH POLY. ALL CUSTOMERS DALLAS SYSTEM IMPROVEMENT
171 080.71018 1,101
RELOCATE FACILITIES. INSTALL 3565 FEET OF 4 INCH AND 3285 FEET OF 2 INCH POLY
ALONG GLENN LANE AND MILAS LANE AND ABANDON 6850 FEET OF 2 INCH POLY TO
ACCOMMODATE CITY OF GLENN HEIGHTS ROAD IMPROVEMENT PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLENN HEIGHTS RELOCATION OF FACILITIES
172 080.71021 700
INSTALL 520 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY ALONG WEST PARKWAY AND
ABANDON 377 FEET OF 3 INCH AND 230 FEET OF 2 INCH AND 20 FEET OF 4 INCH STEEL
AND 54 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY
173 080.71031 (2,555)
RELOCATE FACILITIES. INSTALL 524 FEET OF 2 INCH POLY AND ABANDON 507 FEET OF 2
INCH STEEL ALONG BATES STREET IN ACCORDANCE TO THE TEXAS RAILROAD
COMMISSION RULE 8.209.ALL CUSTOMERS KELLER SYSTEM INTEGRITY
174 080.71033 (5,162)
RELOCATE FACILITIES. INSTALL 3580 FEET OF 4 INCH POLY ALONG OLD HEARNE ROAD
AND ABANDON 1465 FEET OF 4 INCH, 1383 FEET OF 3 INCH AND 98 FEET OF 2 INCH POLY
AND 70 FEET OF 2 INCH AND 225 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF
BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES
175 080.71043 (7,638)
INSTALL 3,600 FEET OF 3 INCH STEEL ALONG LINE U22 IN SEAGOVILLE AND ABANDON
3,600 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS MCCAULLEY SYSTEM INTEGRITY
176 080.71107 21
INSTALL 670 FEET OF 4 INCH POLY ALONG BONHAM STREET AND ABANDON 670 FEET OF
4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY
177 080.71126 (8,450)
INSTALL 2300 FEET OF 2 INCH POLY ALONG PEGGY LANE AND ABANDON 2300 FEET OF 2
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
178 080.71129 842
RELOCATE FACILITIES. INSTALL 275 FEET OF 2 INCH, 480 FEET OF 4 INCH, 1000 FEET OF 6
INCH AND 305 FEET OF 8 INCH POLY ALONG SKILLMAN STREET AND ABANDON 690 FEET
OF 2 INCH AND 220 FEET OF 3 INCH POLY AND 1390 FEET OF 4 INCH STEEL TO
ACCOMMODATE TXDOT PROJECT. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
179 080.71130 (1,739)
INSTALL 343 FEET OF 4 INCH POLY ALONG OAKMONT DRIVE AND ABANDON 337 FEET OF 4
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY
180 080.71168 (261)
RELOCATE FACILITIES. INSTALL 175 FEET OF 2 INCH POLY ALONG ACCENT DRIVE AND
ABANDON 135 FEET OF 2INCH POLY. ALL CUSTOMERS PLANO SYSTEM INTEGRITY
181 080.71174 (5,520)
INSTALL 790 FEET OF 4 INCH AND 5 FEET OF 2 INCH POLY AND ABANDON 585 FEET OF 4
INCH AND 395 FEET OF 2 INCH POLY IN RED BIRD MALL. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
182 080.71177 (179,548)
RELOCATE FACILITIES. INSTALL 874 FEET OF 2 INCH, 6104 FEET OF 4 INCH AND 2279 FEET
OF 6 INCH POLY ALONG HIGHWAY 5 AND ABANDON DISTRICT REGULATOR STATION #3,
1143 FEET OF 1-1/4 & 2 INCH AND 3308 FEET OF 3 INCH STEEL AND 432 FEET OF 2 INCH
POLY, 1619 FEET OF 3 POLY, 238 FEET OF 4 INCH POLY AND 1932 FEET OF 6 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA SYSTEM INTEGRITY
183 080.71224 310
INSTALL 1400 FEET OF 2 INCH POLY AND ABANDON 125 FEET OF 4 INCH STEEL, 292 FEET
OF 4 INCH POLY, 211 FEET OF 3 INCH STEEL, 145 FEET OF 2 INCH STEEL, 346 FEET OF 2
INCH POLY, AND 151 FEET OF 2 INCH STEEL AND DISTRICT REGLUATOR STATION 23 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY
184 080.71255 (2,839,533)
RELOCATE FACILITIES. INSTALL 1769 FEET OF 20 INCH STEEL AND ABANDON 1759 FEET
OF 20 INCH STEEL ALONG IH 635 TO ACCOMODATE TXDOT IH 635 IMPROVEMENTS
PROJECT.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
185 080.71294 (200)
INSTALL 2500 FEET OF 2 INCH POLY AND ABANDON 2550 FEET OF 3 INCH POLY ALONG
COLLEGE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY
186 080.71302 781
INSTALL 1075 FEET OF 4 INCH AND 350 FEET OF 2 INCH POLY ALONG NORTH BANKS AND
WEST 5TH STREET AND ABANDON 485 FEET OF 2 INCH AND 922 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALDWELL SYSTEM INTEGRITY
187 080.71303 732
INSTALL 600 FEET OF 4 INCH AND 700 FEET OF 2 INCH POLY ALONG NORTH BANKS
STREET AND ABANDON 600 FEET OF 2 INCH COATED STEEL AND 700 FEET OF 2 INCH
BARE STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALDWELL SYSTEM INTEGRITY
188 080.71304 (113,418)
INSTALL 13,251 FEET OF 12 INCH POLY ALONG HARMON ROAD FROM HERITAGE TRACE
PARKWAY TO GOLDEN TRIANGLE ROAD IN FORT WORTH. ALL CUSTOMERS FORT WORTH SYSTEM IMPROVEMENT
189 080.71368 (1,955)
INSTALL 2,225 FEET OF 2 INCH POLY AND ABANDON 2,233 FEET OF 2 INCH STEEL, 222
FEET OF 2 INCH POLY, 285 FEET OF 4 INCH STEEL, DISTRICT REGULATOR STATION 112
ALONG JACQUELINE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
190 080.71369 (490)
INSTALL 2350 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY ALONG ROBERTS STREET
AND ABANDON 1919 FEET OF 4 INCH AND 627 FEET OF 3 INCH STEEL AND VERNON
DISTRICT REGLUATOR STATION 18 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS VERNON SYSTEM INTEGRITY
191 080.71387 (26,327)
INSTALL 2,750 FEET OF 2 INCH POLY AND ABANDON 2,750 FEET OF 4 INCH STEEL ALONG
THE STREETS OF TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY
192 080.71412 30,622
INSTALL 5150 FEET OF 4 INCH POLY AND 1709 FEET OF 2 INCH POLY AND ABANDON 944
FEET OF 6 INCH POLY, 3646 FEET OF 3 INCH POLY, AND 1919 FEET OF 2 INCH POLY
ALONG THUNDERBIRD LANE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS PLANO SYSTEM INTEGRITY
193 080.71429 (9,609)
RELOCATE FACILIITES. INSTALL 1,078 FEET OF 6 INCH POLY AND 283 FEET OF 10 INCH
STEEL AND ABANDON 120 FEET OF 6 INCH, 958 FEET OF 4 INCH POLY AND 110 FEET OF 10
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WYLIE SYSTEM INTEGRITY
194 080.71467 (54,125)
INSTALL DISTRICT REGULATOR STATION #237 AND 1,500 FEET OF 4 INCH POLY AND
ABANDON DISTRICT REGULATOR STATION #237, 1,500 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
195 080.71517 67
RELOCATE FACILITIES. INSTALL 3,750 FEET OF 4 INCH AND 350 FEET OF 2 INCH POLY
ALONG HARD ROCK ROAD AND PIONEER DRIVE AND ABANDON 20 FEET OF 6 INCH POLY,
617 FEET OF 4 INCH STEEL, 1,948 FEET OF 4 INCH POLY, 951 FEET OF 2 INCH STEEL TO
ACCOMMODATE THE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES
MTX Retirements
Page 5 of 45
505
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
196 080.71522 (50,213)
INSTALL DISTRICT REGULATOR STATION 407 AND ABANDON DISTRCT REGULATOR
STATION #407 ALONG THE STREETS OF FORT WORTH IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
197 080.71528 (188)
INSTALL DISTRICT REGULATOR STATION 426 IN FORT WORTH AND ABANDON DISTRICT
REGULATOR STATION 426 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
198 080.71531 (4,647)
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION
503 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
199 080.71532 (75,197)
ABANDON DISTRICT REGULATOR STATION 529 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
200 080.71534 (2,461)
RELOCATE FACILITIES. INSTALL 1950 FEET OF 4 INCH AND 1715 FEET OF 2 INCH POLY
ALONG SOUTH BROAD STREETAND ABANDON 2640 FEET OF 3 INCH STEEL 1075 FEET OF
3 INCH AND 260 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CEDAR HILL STREET
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL RELOCATION OF FACILITIES
201 080.71567 (6,301)
RELOCATE FACILITIES. INSTALL 500 FEET OF 4 INCH POLY AND ABANDON 4 INCH STEEL
ALONG DOVE STREET ALL CUSTOMERS SOUTHLAKE RELOCATION OF FACILITIES
202 080.71592 6,512
RELOCATE FACILITIES. INSTALL 1600 FEET OF 2 INCH AND 125 FEET OF 4 INCH POLY AND
ABANDON 200 FEET OF 2 INCH STEEL AND 180 FEET OF 4 INCH STEEL AND 40 FEET OF 3
INCH STEEL ALONG BETSY DRIVE AND KARNES DRIVE TO ACCOMMODATE THE CITY OF
ROBINSON DRAINAGE PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS ROBINSON RELOCATION OF FACILITIES
203 080.71607 3,099
INSTALL 785 FEET OF 6 INCH POLY, 1430 FEET OF 4 INCH POLY AND 25 FEET OF 2 INCH
POLY ALONG S. BROADWAY AND ABANDON 940 FEET OF 2 INCH STEEL AND 855 FEET OF
2 INCH POLY 300 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY
204 080.71647 562
INSTALL 1600 FEET OF 2 INCH POLY ALONG THE ALLEY BETWEEN SPEEDWAY AND
VICTORY AND ABANDON 1306 FEET OF 4 INCH STEEL, 22 FEET OF 3 INCH STEEL, 414 FEET
OF 4 INCH POLY AND 7 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
205 080.71648 1,854
INSTALL 1200 FEET OF 2 INCH POLY IN THE ALLEY BETWEEN SPEEDWAY AVENUE AND
ABANDON 1200 FEET OF 4 INCH STEEL AND 33 FEET OF 4 INCH POLY IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
206 080.71703 (3,724)
RELOCATE FACILITIES.&NBSP; INSTALL 1600 FEET OF 4 INCH AND 345 FEET OF 2 INCH
POLY ALONG PALASOTA DRIVE AND ABANDON 1200 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY
207 080.71710 5,539
RELOCATE FACILITIES. INSTALL 1977 FEET OF 2 INCH POLY ALONG GRIFFIN STREET AND
PINE STREET AND ABANDON 1473 FEET OF 2 INCH POLY AND 591 FEET OF 2 INCH STEEL
TO ACCOMMODATE THE CITY OF MCKINNEY IMPROVEMENT PROJECT IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY
208 080.71716 (36,144)
INSTALL 4,350 FEET OF 2 INCH, 1,200 FEET OF 4 INCH, 620 FEET OF 6 INCH, AND 400 FEET
OF 4 INCH POLY ALONG THE STREET OF HALBERT STREET AND ABANDON DISTRICT
REGULATOR STATION# 429, 2,950 FEET OF 4 INCH 1,615 FEET OF 3 INCH STEEL, 315 FEET
OF 4 INCH, 60 FEET OF 2 INCH AND 1,100 FEET OF 4 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
209 080.71738 1,094
INSTALL 3615 FEET OF 4 INCH AND 550 FEET OF 2 INCH POLY ALONG EDGEWOOD
TERRACE AND ABANDON 3300 FEET OF 4 INCH POLY AND 1060 FEET OF 6 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
210 080.71760 (51,798)
RELOCATE FACILITIES. INSTALL 2603 FEET OF 8 INCH, 2891 FEET OF 4 INCH AND 720 FEET
OF 2 INCH POLY AND ABANDON 747 FEET OF 8 INCH, 1689 FEET OF 6 INCH, 985 FEET OF 4
INCH, 1404 FEET OF 3 INCH, 107 FEET OF 2 INCH STEEL, 10 FEET OF 4 INCH POLY AND 439
FEET OF 3 INCH POLY ALONG HARBIN STREET TO ACCOMMODATE THE CITY OF
STEPHENVILLE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY
211 080.71773 (37,802)
INSTALL 2,140 FEET OF 2 INCH, 1,600 FEET OF 4 INCH, AND 800 FEET OF 6 INCH POLY
ALONG THE STREETS OF 13TH AND 15TH AND ABANDON 1,300 FEET OF 2 INCH, 1,250
FEET OF 4 INCH, 100 FEET OF 3 INCH POLY AND 340 FEET OF 2 INCH, 800 FEET OF 6 INCH,
550 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY
212 080.71805 (7,733)
INSTALL 1,480 FEET OF 4 INCH AND 1,020 FEET OF 2 INCH POLY ALONG THE STREETS OF
CHAMBERLAND AVENUE AND ABANDON 400 FEET OF 4 INCH, AND 1,300 FEET OF 2 INCH
STEEL AND 800 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #01 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EMHOUSE SYSTEM INTEGRITY
213 080.71832 (83,916)
RELOCATE FACILITIES. INSTALL 4,100 FEET OF 8 INCH POLY ALONG HIGHWAY 287 AND
ABANDON 3.060 FEET OF 6 INCH POLY, AND 370 FEET OF 6 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY
214 080.71838 20
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY ALONG CARROLL DRIVE AND
ABANDON 495 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES
215 080.71839 (401,732)
INSTALL 83,000 FEET (16 MILES) OF 6 INCH, 100 FEET OF 4 INCH, 3,000 FEET OF 2 INCH
POLY AND 8 DISTRICT REGULATOR STATIONS ALONG LINE E16 IN PARIS AND ABANDON
44,455 FEET OF 8 INCH, 42,425 FEET OF 4 INCH, 300 FEET OF 6 INCH, 175 FEET OF 3 INCH
STEEL AND 325 FEET OF 8 INCH POLY AND 8 MAIN LINE REGULATOR STATIONS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY
216 080.71850 (27)
REPLACE 5.7 MILES OF 3 INCH STEEL WITH 4 INCH STEEL ALONG LINE L8AE1 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BUFFALO SYSTEM INTEGRITY
217 080.71856 (3,603)
INSTALL 3200 FEET OF 6 INCH, 100 FEET OF 2 INCH POLY AND 3.2 MILES OF 12 INCH
STEEL ALONG LINE 028 AND ABANDON 3.2 MILES OF 3.5 INCH STEEL AND MAIN LINE
REGULATOR 42 AND 15 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS ROWLETT SYSTEM INTEGRITY
218 080.71884 (3,919)
INSTALL DISTRICT REGULATOR STATION #03 ALONG THE STREETS OF GRANBURY AND
ABANDON DISTRICT REGULATOR STATION #03 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY
219 080.71892 (974,020)
INSTALL 1,769 FEET OF 20 INCH STEEL AND ABANDON 1,449 FEET OF 20 INCH STEEL
ALONG LBJ AND MCCREE ROAD TO ACCOMODATE THE TXDOT-DRIVEN IH635
IMPROVEMENTS PROJECT IN GARLAND, DALLAS COUNTY. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES
220 080.71894 (46,358)
INSTALL DISTRICT REGULATOR STATION, 2,057 FEET OF 2 INCH, 1,708 FEET OF 4 INCH,
194 FEET OF 6 INCH POLY AND 81 FEET OF 10 INCH, 254 FEET OF 8 INCH, AND 51 FEET OF
4 INCH STEEL CASING ALONG THE STREET NORTH ALLEY AND NASH AND ABANDON 2,936
FEET OF 6 INCH, 300 FEET OF 4 INCH, 126 FEET OF 3 INCH, AND 103 FEET OF 2 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY
221 080.71907 (81,744)
INSTALL 300 FEET OF 6 INCH POLY ALONG WEST PIPELINE AND CHATEAU VALEE IN
EULESS AND ABANDON 261 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS SYSTEM INTEGRITY
222 080.71909 (142,060)
INSTALL 530 FEET OF 6 INCH AND 10 FEET OF 2 INCH POLY ALONG WEST PIPELINE AND
COLUMBUS IN BEDFORD AND ABANDON 516 FEET OF 6 INCH STEEL AND 10 FEET OF 2
INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEDFORD SYSTEM INTEGRITY
223 080.71910 (85,782)
INSTALL 325 FEET OF 6 INCH, 10 FEET OF 4 INCH POLY ALONG WEST PIPELINE AND
GETTYSBURG IN BEDFORD AND ABANDON 284 FEET OF 6 INCH AND 10 FEET OF 3 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEDFORD SYSTEM INTEGRITY
224 080.71921 (1,165)
RELOCATE FACILITIES. INSTALL 1230 FEET OF 2 INCH POLY AND 2015 FEET OF 4 INCH
POLY AND ABANDON 2747 FEET OF 2 INCH STEEL ALONG STARK STREET TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
225 080.71948 (21,531)
INSTALL 4500 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 323,
2000 FEET OF 4 INCH STEEL AND 2500 FEET OF 4 INCH POLY ALONG EAST BEKNAP
STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
226 080.71951 (31)
INSTALL 8585 FEET OF 4 INCH STEEL AND ABANDON 8585 FEET OF 4 INCH STEEL ALONG
THE STREETS OF GAINESVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULES 8.209.ALL CUSTOMERS MYRA SYSTEM INTEGRITY
227 080.71954 (593) INSTALL 20 FEET OF 6 INCH POLY ALONG LAKESIDE PARKWAY. ALL CUSTOMERS COPPELL SYSTEM IMPROVEMENT
MTX Retirements
Page 6 of 45
506
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
228 080.71956 (14,517)
RELOCATE FACILITIES. INSTALL 156 FEET OF 2 INCH AND 1,616 FEET OF 4 INCH POLY
ALONG COLORADO STREET AND ABANDON 558 FEET OF 2 INCH AND 250 FEET OF 4 INCH
POLY AND 416 FEET OF 3 INCH STEEL IN COLLIN COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA SYSTEM INTEGRITY
229 080.71960 (53)
INSTALL 3025 FEET OF 2 INCH POLY ALONG EAST HARRISON STREET AND SHERMAN
STREET AND ABANDON 100 FEET OF 1.5 INCH STEEL, 747 FEET OF 3 INCH STEEL, 1477
FEET OF 4 INCH STEEL, 37 FEET OF 3 INCH POLY, 100 FEET OF 4 INCH LP POLY AND
DISTRICT REGULATOR STATION 02 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS MELISSA SYSTEM INTEGRITY
230 080.71962 2,529
INSTALL 450 FEET OF 2 INCH POLY AND 2160 FEET OF 4 INCH POLY ALONG NORTH
CENTRAL STREET AND ABANDON 1999 FEET OF 3 INCH STEEL, 275 FEET OF 3 INCH POLY
AND DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS MELISSA SYSTEM INTEGRITY
231 080.71969 (16,573)
RELOCATE FACILITIES. INSTALL TWO 6 INCH ISOLATION VALVE, 10 INCH MAINLINE
VALAVE, 80 FEET OF 16 INCH STEEL AND ABANDON 80 FEET OF 16 INCH STEEL ALONG
THE STREETS OF ARLINGTON. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES
232 080.71975 31
INSTALL 400 FEET OF 2 INCH STEEL AND ABANOND 400 FEET OF 2 INCH STEEL ALONG
LINE U9-1 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS MUNDAY SYSTEM INTEGRITY
233 080.71982 (13,437)
INSTALL 1,407 FEET OF 8 INCH AND 10 FEET OF 2 INCH POLY ALONG MT. ZION ROAD AND
ABANDON 1,330 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY
234 080.71993 (384)
INSTALL 26,498 FEET OF 4 INCH STEEL AND ABANDON 26,498 FEET OF 3 INCH STEEL
ALONG JOE REEVES ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULES 8.209.ALL CUSTOMERS TRENTON SYSTEM INTEGRITY
235 080.71999 (95,990)
INSTALL 3,650 FEET OF 4 INCH, 7,750 FEET OF 2 INCH POLY ALONG DAVIS STREET IN
CLEBURNE AND ABANDON 8,085 FEET OF 4 INCH, 1,540 FEET OF 2 INCH STEEL AND 520
FEET OF 4 INCH, 825 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY
236 080.72011 646
RELOCATE FACILITIES. INSTALL 2100 FEET OF 2 INCH POLY AND ABANDON 1285 FEET OF
2 INCH STEEL ALONG REDBUD TO ACCODATE THE CITY OF GARLAND IMPROVEMENT
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES
237 080.72012 (309)
RELOCATE FACILITIES. INSTALL 45 FEET OF 2 INCH POLY AND 85 FEET OF 6 INCH POLY
ALONG GARAPAN DRIVE AND ABANDON 45 FEET OF 2 INCH POLY AND 85 FEET OF 6 INCH
STEEL TO ACCOMMODATE THE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
238 080.72035 (1,183)
INSTALL 1000 FEET OF 2 INCH POLY AND ABANDON 950 FEET OF 2 INCH STEEL AND
DISTRICT REGULATOR STATION 15 ALONG WATERS COURT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY
239 080.72036 (3,035)
INSTALL 750 FEET OF 2 INCH POLY AND 3100 FEET OF 4 INCH POLY AND ABANDON 530
FEET OF 4 INCH POLY, 4765 FEET OF 4 INCH STEEL, 475 FEET OF 6 INCH POLY, 2620 FEET
OF 6 INCH STEEL, 40 FEET OF 6 INCH CAST IRON AND 170 FEET OF 8 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
240 080.72039 (8,691)
RELOCATE FACILITIES. INSTALL 5350 FEET OF 8 INCH, 425 FEET OF 4 INCH, AND 255 FEET
OF 2 INCH POLY AND ABANDON 4115 FEET OF 4 INCH STEEL, 1555 FEET OF 4 INCH, 60
FEET OF 3 INCH, AND 50 FEET OF 2 INCH POLY ALONG CEDAR HILL SOUTH CLARK TRAIL
TO ACCOMMODATE THE CITY OF DESOTO IMPROVEMENT PROJECT IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULES 8.209. ALL CUSTOMERS CEDAR HILL RELOCATION OF FACILITIES
241 080.72045 (708)
INSTALL 300 FEET OF 12 INCH STEEL ALONG UNION STREET AND ABANDON 300 FEET OF
12 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY
242 080.72075 (104,142)
RELOCATE FACILITIES. INSTALL 510 FEET OF 4 INCH POLY AND RETIRE 500 FEET OF 4
INCH STEEL AND 115 FEET 2 INCH STEEL ALONG CENTRAL TEXAS PARKWAY TO
ACCOMMODATE CITY OF WACO STREET PROOJECT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
243 080.72082 (1,259)
RELOCATE FACILITIES. INSTALL 250 FEET OF 2 INCH POLY AND ABANDON 150 FEET OF 2
INCH POLY ALONG PRIVATE DRIVE IN NORTH RICHLAND HILLS, TX. ALL CUSTOMERS NORTH RICHLAND HILLS RELOCATION OF FACILITIES
244 080.72085 (112,236)
RELOCATE FACILITIES. INSTALL 922 FEET OF 6 INCH POLY, 3601 FEET OF 4 INCH POLY
AND 597 FEET OF 2 INCH POLY AND ABANDON 2070 FEET OF 6 INCH STEEL, 2390 FEET OF
4 INCH STEEL AND 449 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF IRVING
STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY
245 080.72099 (8,948)
RELOCATE FACILIITES.&NBSP; INSTALL 85 FEET OF 6 INCH POLY ALONG BELTLINE AND
ABANDON 55 FEET OF 6 INCH POLY IN ACCORDDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS DESOTO SYSTEM INTEGRITY
246 080.72122 3,325
INSTALL 2694 FEET OF 2 INCH POLY AND 4379 FEET OF 4 INCH POLY ALONG STREETS OF
ITALY AND ABANDON 2469 FEET OF 2 INCH STEEL, 4046 FEET OF 3 INCH STEEL, 150 FEET
OF 3 INCH POLY, 585 FEET OF 4 INCH STEEL, 815 FEET OF 4 INCH POLY AND DISTRICT
REGULATOR STATION 03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS ITALY SYSTEM INTEGRITY
247 080.72199 1,524
INSTALL 3500 FEET OF 2 INCH POLY ALONG TATE STREET AND ABANDON 1850 FEET OF 4
INCH STEEL AND 460 FEET OF 4 INCH, 420 FEET OF 3 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY
248 080.72203 608
RELOCATE FACILITIES. INSTALL 2119 FEET OF 6 INCH POLY, 120 FEET OF 4 INCH POLY
AND 171 FEET OF 2 INCH POLY ALONG PIPELINE ROAD AND ABANDON 1760 FEET OF 6
INCH POLY, 164 FEET OF 4 INCH POLY AND 176 FEET OF 2 INCH STEEL TO ACCOMMODATE
CITY OF HURST STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS HURST RELOCATION OF FACILITIES
249 080.72211 (295,546) PREPARE KILLEEN SERVICE CENTER FOR RETIREMENT. ALL CUSTOMERS SYSTEM WIDE STRUCTURES
250 080.72217 (32)
RELOCATE FACILITIES. ABANDON 475 FEET OF 4 INCH STEEL ALONG STATE HIGHWAY 199
TO ACCOMMODATE TXDOT STREET PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH SYSTEM INTEGRITY
251 080.72223 (9,614)
RELOCATE FACIILITIES. INSTALL 1,300 FEET OF 6 INCH AND 200 FEET OF 2 INCH POLY
ALONG SPRING VALLEY ROAD AND LINGCO DRIVE IN RICHARDSON AND ABANDON 1,300
FEET OF 6 INCH STEEL AND 200 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY
252 080.72239 208
ABANDON 226 FEET OF 3 INCH POLY, 290 FEET OF 0.75" INCH POLY ALONG 1900 EAST
PARMER LANE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AUSTIN SYSTEM INTEGRITY
253 080.72266 (79,234)
INSTALL 42,100 FEET OF 4 INCH STEEL AND ABANDON 42,070 FEET OF 6 INCH STEEL
ALONG LINE O29 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS SCURRY SYSTEM INTEGRITY
254 080.72270 (20,542)
INSTALL 3,100 FEET OF 2 INCH POLY ALONG SPRINGWOOD LANE AND SPRINGPARK WAY
IN PLANO AND ABANDON 3,100 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY
255 080.72275 2,708
RELOCATE FACILITIES. INSTALL 860 FEET OF 4 INCH POLY, 20 FEET OF 2 INCH POLY AND
ABANDON 800 FEET OF 4 INCH STEEL, 60 FEET OF 4 INCH POLY, 20 FEET OF 2 INCH POLY
ALONG CULVER AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
256 080.72278 (1,138)
INSTALL 2000 FEET OF 2 INCH AND 550 FEET OF 4 INCH POLY ALONG LINE C10-5 AND
ABANDON 3 MILES OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS NORTH RICHLAND HILLS SYSTEM INTEGRITY
257 080.72292 4,580
INSTALL 3635 FEET OF 2 INCH POLY AND ABANDON 14 FEET OF 1.25 INCH POLY, 1899
FEET OF 2 INCH POLY, 13 FEET OF 1.25 INCH STEEL, 1511 FEET OF 2 INCH STEEL AND
ABANDON DRS04 ALONG STREETS OF LIPAN IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LIPAN SYSTEM INTEGRITY
258 080.72294 6,482
INSTALL 425 FEET OF 6 INCH POLY AND 465 FEET OF 2 INCH POLY AND ABANDON 425
FEET OF 6 INCH POLY AND 465 FEET OF 2 INCH POLY ALONG WILLIMAS DRIVE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY
259 080.72300 8,501 INSTALL 2,550 FEET OF 6 INCH POLY ALONG FM 691. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS DENISON GROWTH
260 080.72308 539
INSTALL 1150 FEET OF 2 INCH POLY ALONG DAWN DRIVE AND ABANDON 1150 FEET OF 2
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY
261 080.72310 (237)
REPLACE DISTRICT REGULATOR STATION #02 IN VENUS AND ABANDON EXISTING DRS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VENUS SYSTEM INTEGRITY
MTX Retirements
Page 7 of 45
507
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
262 080.72321 385
INSTALL 1525 FEET OF 2 INCH POLY ALONG STREETS OF RANGER AND ABANDON 173
FEET OF 1.25 INCH STEEL, 67 FEET OF 2 INCH STEEL, 14 FEET OF 3 INCH STEEL, 29 FEET
OF 4 INCH STEEL, 65 FEET OF 2 INCH POLY AND 68 FEET OF 4 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER SYSTEM INTEGRITY
263 080.72322 672
INSTALL 1650 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION AND ABANDON
1221 FEET OF 2 INCH STEEL AND 468 FEET OF 3 INCH STEEL AND DISTRICT REGULATOR
STATION 11 ALONG STREETS OF RANGER IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER SYSTEM INTEGRITY
264 080.72324 (353,997)
INSTALL 1,445 FEET OF 6 INCH AND 2,132 FEET OF 8 INCH POLY ALONG THE STREETS OF
JIM CHRISTAL TOAD AND N WESTERN BOULEVARD IN DENTON, DENTON COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY
265 080.72347 (39,049)
RELOCATE FACILITIES.&NBSP; INSTALL 925 FEET OF 2 INCH AND 300 FEET OF 8 INCH
POLY ALONG ECHO BLUFF AND ABANDON 925 FEET OF 2 INCH POLY AND 330 FEET OF 8
INCH STEEL TO ACCOMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
266 080.72348 (183)
INSTALL 80 FEET OF 2 INCH POLY AND 100 FEET OF 2 INCH POLY ALONG COUNTY ROAD
825 AND ABANDON 25 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYLVESTER SYSTEM INTEGRITY
267 080.72367 (1,081)
RELOCATE FACILITIES. INSTALL 1948 FEET OF 6 INCH POLY, 75 FEET OF 4 INCH POLY
AND 344 FEET OF 2 INCH POLY AND ABANDON 1527 FEET OF 6 INCH POLY AND 387 FEET
OF 4 INCH POLY TO ACCOMMODATE CITY OF COLLEYVILLE STREET PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE RELOCATION OF FACILITIES
268 080.72369 585
RELOCATE FACILITIES. INSTALL 950 FEET OF 4 INCH AND 330 FEET OF 2 INCH POLY
ALONG N COLLEGE STREET AND ABANDON 300 FEET OF 4 INCH, 773 FEET OF 2 INCH
STEEL, 87 FEET OF 4 INCH, 107 FEET OF 2 INCH, AND 445 FEET OF 1.25 INCH POLY TO
ACCOMMODATE THE CITY OF WAXAHACHIE DRAINAGE PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE RELOCATION OF FACILITIES
269 080.72372 (26,669)
INSTALL 3,370 FEET OF 2 INCH POLY ALONG MONTICELLO ROAD IN WAXAHACHIE AND
ABANDON 2,301 FEET OF 2 INCHSTEEL AND 159 FEET OF 3 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY
270 080.72389 4,926
INSTALL 1100 FEET OF 2 INCH POLY AND ABANDON 816 FEET OF 4 INCH POLY, 306 FEET
OF 4 INCH, AND 378 FEET OF 4 INCH STEEL ALONG BIRCH STREET IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
271 080.72390 (15,088)
INSTALL 1,000 OF 2 INCH POLY ALONG BEECH STREET AND ABANDON 606 FEET OF 2 INCH
AND 879 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
272 080.72391 (14,230)
INSTALL 2,300 FEET OF 2 INCH POLY ALONG SEYMOUR AND CHERRY IN WICHITA FALLS
AND ABANDON 663 FEET OF 2 INCH, 341 FEET OF 4 INCH, 463 FEET OF 1.25 INCH STEEL
AND 344 FEET OF 4 INCH, 506 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
273 080.72392 (826)
INSTALL 1,375 FEET OF 2 INCH POLY AND ABANDON 572 FEET OF 2 INCH, 805 FEET OF 4
INCH STEEL AND 26 FEET OF 4 INCH POLY ALONG AVE J AND ARTHUR IN WICHITA FALLS
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
274 080.72413 (10,507)
INSTALL 5,750 FEET OF 4 INCH STEEL, MAIN LINE REGULATOR STATION AND ABANDON
5,750 FEET OF 2 INCH STEEL, MAIN LINE REGULATOR STATION ALONG US HWY 77 IN ELLIS
COUNTY. IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORRESTON SYSTEM INTEGRITY
275 080.72420 (4,306)
INSTALL 2257 FEET OF 2 INCH POLY, 840 FEET OF 4 INCH POLY AND ABANDON 3171 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
276 080.72437 255
INSTALL 2065 FEET OF 2 INCH POLY ALONG COUNTY ROAD 816 AND ABANDON 2410 FEET
2 INCH STEEL AND DISTRICT REGLUATOR STATION IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYLVESTER SYSTEM INTEGRITY
277 080.72438 (32,686)
INSTALL 1225 FEET OF 2 INCH AND 1500 FEET OF 4 INCH POLY ALONG THE STREETS OF
WACO AND ABANDON 1225 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
278 080.72439 (28,917)
INSTALL 1,135 FEET OF 2 INCH AND 1,430 FEET OF 4 INCH POLY ALONG GORMAN AND
MORROW STREETS AND ABANDON 2,401 FEET OF 4 INCH STEEL, 336 FEET OF 4 INCH AND
716 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE OF 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY
279 080.72448 (367)
INSTALL 2155 FEET OF 4 INCH POLY AND 645 FEET OF 2 INCH POLY AND ABANDON 2155
FEET OF 4 INCH STEEL AND 645 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
280 080.72449 9,649
INSTALL 2150 FEET OF 4 INCH POLY AND 360 FEET OF 2 INCH POLY AND ABANDON 2050
FEET OF 4 INCH STEEL AND 330 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
281 080.72450 (124)
INSTALL 2600 FEET OF 4 INCH POLY AND ABANDON 2402 OF 3 INCH STEEL ALONG
GUTHRIE DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY
282 080.72452 (4,695)
RELOCATE FACILITIES. INSTALL 700 FEET OF 2INCH POLY AND ABANDON 950 FEET OF
STEEL ALONG CHERYL ST IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
283 080.72461 490
RELOCATE FACILITIES. INSTALL 900 FEET OF 4 INCH POLY AND ABANDON 900 FEET OF 3
INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
284 080.72473 (12,299)
INSTALL DISTRICT REGULATOR STATION ALONG HALL JOHNSON ROAD AND ABANDON
DISTRICT REGULATOR STATION #05 AND #08. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY
285 080.72490 1,515
INSTALL 950 FEET OF 2 INCH POLY ALONG SOUTH MAIN STREET AND ABANDON 678 FEET
OF 2 INCH STEEL AND 482 FEET OF 2 INCH POLY AND DISTRICT REGLUATOR STATION 01
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENT SYSTEM INTEGRITY
286 080.72497 676
INSTALL 642 FEET OF 4 INCH POLY ALONG CLARK STREET AND ABANDON 988 FEET OF 4
INCH STEEL, AND 10 FEET OF 2 INCH STEEL ALONG CLARK STREET IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BARTLETT SYSTEM INTEGRITY
287 080.72500 (133,594)
INSTALL 3.200 FEET OF 12 INCH POLY AND ABANDON 3.200 FEET OF 6 INCH POLY ALONG
W. EVERMAN PKWY.ALL CUSTOMERS FORT WORTH SYSTEM IMPROVEMENT
288 080.72505 6,209
RELOCATE FACILITIES. INSTALL 980 FEET OF 4 INCH POLY AND ABANDON 980 FEET OF 3
INCH STEELTO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
289 080.72508 (190)
ABANDON 6630 FEET OF 4 INCH STEEL ALONG HUTTO ROAD IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY
290 080.72512 250
INSTALL 300 FEET OF 4 INCH, 2300 FEET OF 2 INCH POLY ALONG WICKER AVE ALLEYWAY
AND ABANDON 300 FEET OF 3 INCH STEEL, 2300 FEET OF 2 INCH POLY IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY
291 080.72524 (1,389)
INSTALL 2600 FEET OF 2 INCH POLY ALONG SOUDER DRIVE AND ABANDON 1377 FEET OF
2 INCH STEEL, 469 FEET OF 4 INCH STEEL AND 706 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.029. ALL CUSTOMERS HURST SYSTEM INTEGRITY
292 080.72525 (18,447)
RELOCATE FACILITIES.&NBSP;&NBSP; ISNTALL 2,600 FEET ON 2INCH POLY AND ABANDON
1,519 FEET OF 2INCH STEEL ALONG HURSTVIEW DRIVE AND 1.058 FEET OF 2 INCH POLY;
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY
293 080.72526 (33,639)
RELOCATE FACILITIES.; INSTALL 1,200 FEET OF 2 INCH AND 1,500 FEET OF 6 INCH POLY
ALONG NORTH ARTHUR DRIVE AND ABANDON 1,183 FEET OF 1.25 INCH AND 1,127 FEET
OF 2 INCH POLY; 7 FEET OF 1.25 INCH; AND 1,732 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY
294 080.72527 (195,776)
INSTALL 2,550 FEET OF 2 INCH POLY AND ABANDON 2,215 FEET OF 3 INCH STEEL AND 955
FEET OF 4 INCH STEEL ALONG MYRTLE DRIVE IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY
295 080.72528 (410,644)
INSTALL 2,570 FEET OF 4 INCH POLY ALONG CULLUM AVENUE AND ABANDON 93 FEET OF
4 INCH POLY, 2,666 FEET OF 4 INCH STEEL, AND 148 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY
296 080.72529 (60,241)
INSTALL 2,935 FEET OF 4 INCH POLY ALONG HENSON DRIVE AND THOMAS AVENUE AND
ABANDON 45 FEET OF 4 INCH POLY AND 2,848 FEET OF 4 INCH STEEL IN ACCORDANE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY
297 080.72533 (2,657)
RELOCATE FACILITIES.&NBSP; INSTALL 350 FEET OF 2 INCH POLY ALONG 10TH STREET
AND ABANDON 400 FEET OF 2 INCH STEEL AND 350 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
MTX Retirements
Page 8 of 45
508
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
298 080.72535 (4,997)
INSTALL 1,500 FEET OF 2 INCH POLY AND ABANDON 991 FEET OF 2 INCH STEEL AND 430
FEET OF 3 INCH STEEL ALONG EAST WENONAH BOULEVARD IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
299 080.72536 (17,688)
RELOCATE FACILITIES. INSTALL 2,000 FEET OF 2 INCH POLY ALONG WEST WENONAH
BOULEVARD AND ABANDON 1,522 FEET OF 2 INCH STEEL AND 433 FEET OF 2 INCH POLY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
300 080.72545 (1)
RELOCATE FACILITIES. INSTALL 804 FEET OF 4 INCH POLY ALONG FM 2181 AND ABANDON
285 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON RELOCATION OF FACILITIES
301 080.72550 (576)
RELOCATE FACILITIES. INSTALL 172 FEET OF 4 INCH POLY AND ABANDON 172 FEET OF 4
INCH POLY ALONG FORD LANE TO ACCOMMODATE AAON. ALL CUSTOMERS LONGVIEW RELOCATION OF FACILITIES
302 080.72559 (2,277)
INSTALL 20 FEET OF 6 INCH, 493 FEET OF 4 INCH AND 339 FEET OF 2 INCH POLY ALONG
LEGACY DRIVE SOUTH AND ABANDON 20 FEET OF 6 INCH, 200 FEET OF 4 INCH, 163 FEET
OF 3 INCH AND 217 OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS FRISCO SYSTEM INTEGRITY
303 080.72607 334
INSTALL 745 FEET OF 6 INCH AND 10 FEET OF 2 INCH POLY ALONG HAILEY STREET AND
ABANDON 745 FEET OF 6 INCH AND 10 FEET OF 2 INCH BARE STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY
304 080.72617 (36,028)
INSTALL 2,400 FEET OF 2 INCH, 670 FEET OF 6 INCH POLY ALONG THE STREETS OF
ABILENE AND ABANDON 660 FEET OF 3 INCH STEEL AND 331 FEET OF 2 INCH POLY AND
1,765 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
305 080.72618 18
REPLACE DRS05 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS GROESBECK SYSTEM INTEGRITY
306 080.72623 (449)
INSTALL 1354 FEET OF 4 INCH, 744 FEET OF 2 INCH POLY AND ABANDON 961 FEET OF 1.25
INCH STEEL, 177 FEET OF 2 INCH STEEL, 34 FEET OF 2 INCH POLY AND 569 FEET OF 3
INCH POLY MAINS ALONG 845 TIVY STREET IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY
307 080.72649 (7,635)
INSTALL 200 FEET OF 2 INCH, 1,470 FEET OF 4 INCH, 1,000 FEET OF 6 INCH POLY AND
ABANDON 216 FEET OF 2 INCH, 1,642 FEET OF 3 INCH, 229 FEET OF 4 INCH STEEL AND 26
FEET OF 2 INCH, 263 FEET OF 3 INCH AND 334 FEET OF 4 INCH POLY ALONG THE STREETS
OF ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
308 080.72651 (4,123)
INSTALL 1,320 FEET OF 4 INCH, 1,450 FEET OF 6 INCH POLY AND ABANDON 632 FEET OF 2
INCH, 1,590 FEET OF 3 INCH STEEL AND 412 FEET OF 3 INCH POLY ALONG THE STREETS
OF ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
309 080.72653 (2,068)
INSTALL 83 FEET OF 6 INCH AND 396 FEET OF 4 INCH POLY AND ABANDON 45 FEET OF 3
INCH STEEL AND 434 FEET INCH OF 2 INCH POLY ALONG MCCLENDON ROAD. ALL CUSTOMERS HEATH SYSTEM IMPROVEMENT
310 080.72656 (7,749)
INSTALL 2,650 FEET OF 8 INCH POLY ALONG BOIS D ARC AND ABANDON 2,650 FEET OF 3
INCH STEEL.ALL CUSTOMERS HEATH SYSTEM IMPROVEMENT
311 080.72658 (27,325)
INSTALL 258 FEET OF 6 INCH POLY ALONG FM2181 NEAR WILDWOOD LANE AND MIRANDA
PLACE IN DENTON AND ABANDON 240 FEET OF 6 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY
312 080.72663 (77) INSTALL 2300 FEET OF 4 INCH POLY ALONG SMIRL DRIVE. ALL CUSTOMERS ROCKWALL SYSTEM IMPROVEMENT
313 080.72678 622
RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH POLY ALONG PARKPLACE AND
ABANDON 350 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES
314 080.72696 (152,459)
INSTALL 4,250 FEET OF 8 INCH, 3,480 FEET OF 4 INCH AND 2,985 FEET OF 2 INCH POLY
ALONG NORTH PEARSON AND ABANDON 4,300 FEET OF 2 INCH, 3,400 FEET OF 3 INCH
AND 1,640 FEET OF 4 INCH STEEL AND 1,075 FEET OF 2 INCH, 1,940 FEET OF 4 INCH AND
260 FEET OF 8 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS GODLEY SYSTEM INTEGRITY
315 080.72700 (408,883)
RELOCATE FACILITIES.&NBSP; INSTALL REGULATOR STATION AND RETIRE OLD
REGULATOR STATION ALONG FINLEY ROAD DUE TO OBSOLETE COMPONENTS AND
MULTIPLE LEAKS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209 ALL CUSTOMERS IRVING SYSTEM INTEGRITY
316 080.72726 (30,527)
RELOCATE FACILITIES. INSTALL 2,340 FEET OF 4 INCH POLY ALONG SOUTH CAMP
WISDOM AND ABANDON 34 FEET OF 4 INCH STEEL, 445 FEET OF 2INCH AND 1,900 FEET
OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209 ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
317 080.72742 (2,915)
INSTALL 666 FEET OF 4 INCH POLY ALONG EAST AUSTIN AVENUE AND NORTH LAMPASAS
STREET AND ABANDON 355 FEET OF 2 INCH POLY AND 298 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY
318 080.72743 2,945
INSTALL 465 FEET OF 2 INCH AND 1377 FEET OF 4 INCH POLY AND ABANDON 455 FEET OF
4 INCH STEEL, 60 FEET OF 4 INCH POLY, 1127 FEET OF 3INCH STEEL AND 200 FEET OF 2
INCH STEEL ALONG EAST WALNUT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
319 080.72751 (120,662)
INSTALL 36,960 FEET OF 4 INCH STEEL ALONG FM 897 IN BOSQUE COUNTY AND ABANDON
26,960 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE OF 8.209.ALL CUSTOMERS HICO SYSTEM INTEGRITY
320 080.72759 (24,375)
REPLACE 5.25 MILES OF 10 INCH STEEL ALONG LINE KC (WEST) WITH 8 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLYDE SYSTEM INTEGRITY
321 080.72760 (33,992)
INSTALL 2,320 FEET OF 4 INCH AND 465 FEET OF 2 INCH POLY ALONG COLLEGE STREET
AND ABANDON 287 FEET OF 3 INCH, 817 FEET OF 4 INCH POLY AND 1,236 FEET OF 4 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY
322 080.72762 (19,920)
INSTALL 2760 FEET OF 2 INCH POLY ALONG DREXEL DRIVE AND ABANDON 134 FEET OF 3
INCH POLY, 31 FEET OF 4 INCH POLY, 664 FEET OF 3 INCH STEEL, 1,483 FEET OF 4 INCH
STEEL AND DISTRICT REGULATOR STATION 07 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY
323 080.72763 (46,196)
INSTALL 2,610 FEET OF 4 INCH AND 525 FEET OF 2 INCH POLY ALONG BALL STREET AND
ABANDON 1,941 FEET OF 4 INCH POLY AND 964 FEET OF 2, 4, AND 6 INCH STEEL AND
GRAPEVINE DISTRICT REGULATOR STATION #7 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY
324 080.72764 (194,361)
RELOCATE FACILITIES. INSTALL 2,000 FEET OF 12 INCH. 2,500 FEET OF 10 INCH, 1,500
FEET OF 4 INCH STEEL AND 1,000 FEET OF 6 INCH POLY AND NEW HIP TO DISTRICT
REGULATOR STATION ALONG HIGHWAY 6 TO WACO DRIVE AND ABANDON 1,300 FEET OF
12 INCH, 200 FEET OF 10 INCH, 2,200 FEET OF 8 INCH, 1,200 FEET OF 4 INCH, 100 FEET OF
2 INCH STEEL TO ACCOMODATE TXDOT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY
325 080.72765 10
INSTALL 1165 FEET OF 4 INCH POLY ALONG EAST JORDAN ROAD AND ABANDON DRS01,
427 FEET OF 2 INCH STEEL, 986 FEET OF 3 INCH STEEL, 10 FEET OF 2 INCH POLY AND 16
FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS JOSEPHINE SYSTEM INTEGRITY
326 080.72767 (75,996)
INSTALL 1230 FEET OF 4 INCH POLY ALONG CADDO STREET AND ABANDON DRS 02 AND
1172 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS JOSEPHINE SYSTEM INTEGRITY
327 080.72780 (18,830)
INSTALL 3200 FEET OF 4 INCH POLY AND ABANDON 630 FEET OF 4 INCH AND 620 FEET OF
3 INCH BARE STEEL AND 1900 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION
02 IN GODLEY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GODLEY SYSTEM INTEGRITY
328 080.72785 (2,456)
RELOCATE FACILITIES. INSTALL 1050 FEET OF 2 INCH, 460 FEET OF 4 INCH AND 410 FEET
OF 2 INCH POLY ALONG HOUSTON STREET AND RETIRE 400 FEET OF 6 INCH AND 440
FEET OF 4 INCH BARE STEEL AND 336 FEET OF 2 INCH AND 127 FEET OF 3 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON RELOCATION OF FACILITIES
329 080.72789 (783)
RELOCATE FACILITIES. INSTALL 35 FEET OF 2 INCH POLY ALONG PEARL AND ABANDON 30
FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS STREET PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
330 080.72819 (2,553)
RELOCATE FACILITIES. INSTALL 900 FEET OF 4 INCH POLY ALONG IMMANUEL ROAD AND
ABANDON 830 FEET OF 4 INCH POLY TO ACCOMMODATE CITY STREET PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PFLUGERVILLE SYSTEM INTEGRITY
MTX Retirements
Page 9 of 45
509
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
331 080.72825 956
INSTALL 930 FEET OF 4 INCH POLY AND 1291 FEET OF 2 INCH POLY AND ABANDON 2000
FEET OF 3 IN STEEL AND 230 FEET OF 2 IN POLY ALONG BARNETT STREET IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY
332 080.72837 398
INSTALL 1750 FEET OF 2 INCH POLY ALONG RICKETTS STREET AND ABANDON 1086 FEET
OF 2 INCH POLY, 34 FEET OF 2 INCH STEEL, 220 FEET OF 4 INCH STEEL, 200 FEET OF 2
INCH STEEL AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY
333 080.72840 (52,404)
INSTALL 6,945 FEET OF 2 INCH POLY ALONG MISTLETOE DRIVE AND ABANDN 2,035 FEET
OF 4 INCH AND 1,285 FEET OF 2 INCH STEEL AND 240 FEET OF 4 INCH AND 5,945 FEET OF
2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
334 080.72841 (159)
INSTALL 6055 FEET 0F 4 INCH AND 1595 FEET OF 2 INCH POLY ALONG THE STREETS OF
ELIZABETH CREEK SUBDIVISION. RESIDENTIAL FORT WORTH GROWTH
335 080.72855 (2,340)
RELOCATE FACILITIES. INSTALL 380 FEET OF 6 INCH POLY ALONG SOUTH COOPER
STREET AND ABANDON 380 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES
336 080.72857 (13,800)
ABANDON 475 FEET OF 4 INCH, 1,850 FEET OF 3 INCH, 2,910 FEET OF 2 INCH POLY ALONG
WILLOW SPRINGS ROAD AT PARKER HENDERSON ROAD IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
337 080.72869 (4,612)
INSTALL 2800 FEET OF 2 INCH POLY ALONG GLOVER STREET, MULBERRY STREET, NORTH
DAVIS STREET AND ABANDON DISTRICT REGULATOR STATION #11 ALONG CHURCH
STREET AND GLOVER STREET, 905 FEET OF 4 INCH POLY, 545 FEET OF 4 INCH STEEL, 265
FEET OF 3 INCH POLY, 850 FEET OF 2 INCH STEEL AND 75 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY
338 080.72891 (26)
INSTALL 4 INCH DISTRICT REGULATOR STATION AND 200 FEET OF 8 INCH POLY AND
ABANDON 2 INCH DISTRICT REGULATOR STATION AND 200 FEET OF 6 INCH POLY. ALL CUSTOMERS ROWLETT SYSTEM IMPROVEMENT
339 080.72906 (43,831)
RELOCATE FACILITIES. INSTALL 2,540 FEET OF 2 INCH AND 960 FEET OF 6 INCH POLY
ALONG EAST LOUISIANA STREET AND ABANDON 1,924 FEET OF 2 INCH STEEL AND 848
FEET OF 6 INCH POLY IN MCKINNEY, COLLIN COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY
340 080.72930 (128,237)
INSTALL 1,000 OF 4 INCH POLY ALONG MOCKINGBIRD AND AIRLINE IN DALLAS AND
ABANDON 1,400 FEET OF 16 INCH, 680 FEET OF 12 INCH AND 500 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY
341 080.72935 637
INSTALL 2750 FEET OF 4 INCH POLY AND 1150 FEET OF 2 INCH POLY ALONG RICHLAND
AVENUE AND ABANDON 200 FEET OF 2 INCH STEEL, 800 FEET OF 2 INCH POLY AND 1900
FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY
342 080.72949 (24) REPLACE MEASURING STATION 4613 IN ELLIS AND INSTALL 120 FEET OF 4 INCH STEEL. ALL CUSTOMERS ITALY SYSTEM IMPROVEMENT
343 080.72954 (3,092)
INSTALL 1830 FEET OF 4 INCH POLY AND 620 FEET OF 2 INCH POLY ALONG BELKNAP
STREET AND ABANDON 1345 FEET OF 4 INCH STEEL, 445 FEET OF 2 INCH STEEL AND
DISTRICT REGULATOR STATION 06 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS MEXIA SYSTEM INTEGRITY
344 080.72959 (2,014)
INSTALL 850 FEET OF 4 INCH POLY AND 80 FEET OF 8 INCH STEEL AND ABANDON 93 FEET
OF 2 INCH STEEL, 650 FEET OF 4 INCH STEEL AND 845 FEET OF 2 INCH POLY ALONG 8TH
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY
345 080.72970 (7,046)
INSTALL 2400 FEET OF 2 INCH POLY AND 100 FEET OF 4 INCH STEEL ALONG BELKNAP
STREET AND ABANDON 2900 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY
346 080.72973 (22,494)
RELOCATE FACILITIES. INSTALL 722 FEET OF 4 INCH POLY AND ABANDON 514 FEET OF 4
INCH STEEL ALONG CRESTLINE ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
347 080.72975 (7,234)
RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY AND ABANDON 350 FEET OF 4
INCH STEEL IN THE CITY OF RICHLAND HILLS IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS SYSTEM INTEGRITY
348 080.72978 79
RELOCATE FACILITIES. INSTALL 75 FEET OF 4 INCH STEEL AND ABANDON 75 FEET OF 4
INCH STEEL ALONG THE STREETS OF RICHLAND HILLS DUE TO CITY OF RICHLAND HILLS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS RICHLAND HILLS RELOCATION OF FACILITIES
349 080.72983 9,387
INSTALL 4600 FEET OF 2 INCH AND 300 FEET OF 4 INCH POLY ALONG STREETS OF SAN
ANGELO AND ABANDON 500 FEET OF 4 INCH STEEL, 2000 FEET OF 4 INCH STEEL AND 200
FEET OF 2 INCH STEEL, 1200 FEET OF 4 INCH, 300 FEET OF 3 INCH IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY
350 080.72987 (6,851)
INSTALL 2,250 FEET OF 2 INCH POLY AND ABANDON 410 FEET OF 2 INCH ADYL A, 250 FEET
OF 2 INCH POLY AND 1,590 FEET OF 2 INCH STEEL ALONG THE STREETS OF ABILENE,
TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
351 080.72988 (18,699)
INSTALL 2,200 FEET OF 6 INCH AND 20 FEET OF 2 INCH POLY AND ABANDON 627 FEET OF
4 INCH, 540 FEET OF 2 INCH POLY AND 165 FEET OF 4 INCH, AND 636 FEET OF 2 INCH
STEEL ALONG THE STREETS OF ABILIENE, TAYLOR COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
352 080.72990 (3,433)
INSTALL 1,150 FEET OF 2 INCH POLY AND ABANDON 1,150 FEET OF 2 INCH STEEL ALONG
THE STREETS OF ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
353 080.72991 (26,896)
INSTALL 2,530 FEET OF 2 INCH POLY ALONG THE STREETS OF ABILENE AND ABANDON 95
FEET OF 4 INCH, 250 FEET OF 2 INCH POLY AND 1,020 FEET OF 2 INCH, 1,165 FEET OF 4
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
354 080.73007 22
INSTALL 1860 FEET OF 2 INCH POLY AND ABANDON 200 FEET OF 2 INCH POLY AND 1750
FEET OF 2 INCH STEEL ALONG CRAIG STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
355 080.73024 (4,412)
INSTALL 3,684 FEET OF 4 INCH POLY AND ABANDON 2,376 FEET OF 4 INCH STEEL,
ABANDON 1,308 FEET OF 3 INCH STEEL ALONG SHARON STREET AND GRACE STREET IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
356 080.73025 1,137
RELOCATE FACILITIES. INSTALL 850 FEET OF 4 INCH POLY AND 1811 FEET OF 2 INCH
POLY ALONG MEADOWBROOK DRIVE AND ABANDON 672 FEET OF 4 INCH AND 1811 FEET
OF 2 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON STREET PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES
357 080.73026 4,566
RELOCATE FACILITIES. INSTALL 2210 FEET OF 4 INCH POLY. 292 FEET OF 2 INCH POLY
AND ABANDON 599 FEET OF 4 INCH STEEL, 1611 FEET OF 3 INCH STEEL, 292 FEET OF 2
INCH STEEL ALONG HIGHLAND TO ACCOMMODATE CITY OF ARLINGTON STREET PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES
358 080.73027 5,981
INSTALL 2450 FEET OF 4 INCH AND 698 FEET OF 2 INCH POLY AND ABANDON 2450 FEET
OF 4 INCH AND 470 FEET OF 2 INCH STEEL ALONG OVERHILL DRIVE IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
359 080.73028 1,561
RELOCATE FACILITIES. INSTALL 1842 FEET OF 2 INCH POLY AND ABANDON 1592 FEET OF
2 INCH STEEL ALONG JOYCE STREET TO ACCOMMODATE CITY OF ARLINGTON STREET
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES
360 080.73029 (7,860)
INSTALL 346 FEET OF 4 INCH AND 587 FEET OF 2 INCH POLY AND ABANDON 293 FEET IF 4
INCH AND 587 FEET OF 2 INCH STEEL ALONG OVERHILL DRIVE IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
361 080.73031 (15,990)
RELOCATE FACILITIES. INSTALL 1503 FEET OF 4 INCH AND 1124 FEET OF 2 INCH POLY
ALONG BROWNING DRIVE AND ABANDON 845 FEET OF 4 INCH, 658 FEET OF 3 INCH AND
986 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS ARLINGTON RELOCATION OF FACILITIES
362 080.73032 351
INSTALL 2665 FEET OF 4 INCH POLY ALONG STREETS OF ARLINGTON AND ABANDON 1033
FEET OF 4 INCH AND 1518 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
363 080.73033 (379)
INSTALL 1,832 FEET OF 4 INCH POLY, 593 FEET OF 2 INCH POLY AND ABANDON 155 FEET
OF 6 INCH STEEL, 1,585 FEET OF 4 INCH STEEL, 457 FEET OF 2 INCH STEEL ALONG EDNA
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
MTX Retirements
Page 10 of 45
510
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
364 080.73053 49,779
INSTALL 450 FEET OF 6 INCH, 1,120 FEET OF 4 INCH, AND 1,050 FEET OF 2 INCH POLY AND
ABANDON 537 FEET OF 4 IN, 1210 FEET OF 2 IN STEEL AND 278 FEET OF 6 IN, AND 371
FEET OF 3 IN POLY ALONG MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY
365 080.73068 (3,525)
INSTALL 485 FEET OF 4 INCH POLY AND 2225 FEET OF 2 INCH POLY AND ABANDON 300
FEET OF 3 INCH POLY, 1500 FEET OF 4 INCH STEEL, 640 FEET OF 4 INCH STEEL AND 680
FEET OF POLY ALONG MCDONALD STREET AND EAST 3RD STREET IN ACCORDANCE WITH
THE TEXAS RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
366 080.73083 (485)
INSTALL 2225 FEET OF 6 INCH POLY ALONG TRAIL LAKE DRIVE AND ABANDON 2225 FEET
OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
367 080.73089 (1,144)
INSTALL DISTRICT REGULATOR STATION 02, 140 FEET OF 2 INCH POLY ABANDON 140
FEET OF 2 INCH STEEL, DISTRICT REGULATOR STATION 02 ALONG BENNIE STREET IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWENA SYSTEM INTEGRITY
368 080.73094 (46)
RELOCATE FACILITIES. INSTALL 2292 FEET OF 6 INCH POLY AND ABANDON 1782 FEET OF
6 INCH STEEL AND 674 FEET OF 6 INCH POLY ALONG US82 TO ACCOMMODATE CITY OF
NOCONA HIGHWAY PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS NOCONA RELOCATION OF FACILITIES
369 080.73107 (61)
INSTALL 1090 FEET OF 2 INCH POLY AND ABANDON 295 FEET OF 2 INCH STEEL, 809 FEET
DUPONT, 53 FEET OF 2 INCH POLY, DISTRICT REGULATOR STATION 030 ALONG 14TH
STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
370 080.73111 769
INSTALL 1040 FEET OF 2 INCH POLY AND ABANDON 48 FEET OF 2 INCH POLY, 211 FEET OF
2 INCH POLY, 11 FEET OF 3 INCH POLY, 322 FEET OF 2 INCH STEEL, 1006 FEET OF 3 INCH
STEEL, AND DISTRICT REGULATOR STATION 07 ALONG THE STREETS OF GRANBURY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY
371 080.73137 2,429
INSTALL 965 FEET OF 2 INCH POLY ALONG CALVERT STREET AND ABANDON 1130 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS HEARNE SYSTEM INTEGRITY
372 080.73147 (188)
INSTALL 35 FEET OF 4 INCH, 10 FEET OF 4 INCH, AND 25 FEET OF 2 INCH POLY AND
ABANDON 25 FEET OF 4 INCH STEEL, 15 FEET OF 2 INCH POLY, 10 FEET OF POLY AND
DRS12 AT SUNSET DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
373 080.73159 (1,815)
INSTALL 637 FEET OF 2 INCH, 352 FEET OF 4 INCH POLY ALONG MORSE STREET,
JACKSON STREET AND HILL ALLEY STREET IN DENTON AND ABANDON 833 FEET OF 2
INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY
374 080.73163 (2,635)
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY ALONG MELBA AND ABANDON
60 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
375 080.73164 (11,769)
RELOCATE FACILITIES. INSTALL 3,100 FEET OF 2 INCH POLY ALONG HAVENHURST AND
NESTLE DR AND ABANDON 2,950 FEET OF 2 INCH STEELAND 150 FEET OF 1.25 INCH POLY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY
376 080.73169 (11,416)
RELOCATE FACILITIES. INSTALL 1400 FEET OF 12 INCH POLY, 10 FEET OF 6 INCH POLY, 70
FEET OF 4 INCH POLY, 50 FEET OF 2 INCH POLY ALONG E TERRELL AND ABANDON 1400
FEET OF 10 INCH STEEL, 10 FEET OF 6 INCH POLY, 10 FEET OF 4 INCH POLY, 10 FEET OF 3
INCH POLY TO ACCOMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
377 080.73174 558
RELOCATE FACILITES. INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 183 FEET OF 2
INCH POLY ALONG SHEPHERD STREET TO ACCOMMODATE CITY OF IRVING STREET
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES
378 080.73182 (43,830)
INSTALL 5,600 FEET OF 4 INCH, 2,100 FEET OF 2 INCH POLY ALONG IRVING BOULEVARD
BETWEEN SOWERS ROAD AND STRICKLAND PLAZA IN IRVING AND ABANDON 4,455 FEET
OF 4 INCH, 68 FEET OF 3 INCH, 621 FEET OF 1.25 INCH, 84 FEET OF 2 INCH STEEL AND 283
FEET OF 4 INCH, 284 FEET OF 3 INCH, 1,147 FEET OF 2 INCH AND 885 FEET OF 1.25 INCH
POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY
379 080.73194 1,099
INSTALL 1607 FEET OF 2 INCH POLY AND 2316 FEET OF 4 INCH POLY STREETS OF
HILLSBORO AND ABANDON 1688 FEET OF 4 INCH STEEL, 188 FEET OF 3 INCH STEEL, 947
FEET OF 2 INCH STEEL AND 422 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
380 080.73221 1,638
INSTALL 525 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 5, 50
FEET OF 4 INCH STEEL, 390 FEET OF 3 INCH STEEL, 450 FEET OF 4 INCH POLY AND 720
FEET OF 2 INCH POLY ALONG MARBLE STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WYLIE SYSTEM INTEGRITY
381 080.73224 (456)
INSTALL 2300 FEET OF 2 INCH POLY ALONG 5TH STREET AND ABANDON DISTRICT
REGULATOR STATION 02, 670 FEET OF 2 INCH STEEL, 1045 FEET OF 3 INCH STEEL, 40
FEET OF 3 INCH STEEL, 120 OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CRANDALL SYSTEM INTEGRITY
382 080.73226 4,742
INSTALL 1060 FEET OF 2 INCH POLY ALONG STREETS OF MESQUITE AND ABANDON 925
FEET OF 2 INCH STEEL, 955 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION
03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY
383 080.73228 3,961
INSTALL 2200 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION 9, 710
FEET OF 4 INCH STEEL, 1215 FEET OF 3 INCH STEEL, 450 FEET OF 4 INCH POLY AND 430
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
384 080.73230 1,303
INSTALL (2) 8 INCH 3-WAY TEES, (2) 8 INCH TRANSITIONS, (1) 8 INCH POLY VALVE, 340
FEET OF 8 INCH POLY ALONG WYCLIFF AND ABANDON 340 FEET OF 10 INCH STEEL WITH
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
385 080.73238 82,429
INSTALL (1) 12 INCH X16 INCH FOLDING SHORT STOP, (1) 10 INCH 3 WAY TEE, (2) 12 INCH
TRANSITIONS, (1) 12 INCH POLY VALVE, 55 FEET OF 12 INCH POLY AND ABANDON 55 FEET
OF 16 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
386 080.73273 (11,398)
INSTALL 3000 FEET OF 2 INCH POLY ALONG STREETS OF MESQUITE AND ABANDON 390
FEET OF 3 INCH CAST IRON, 1661 FEET OF 3 INCH STEEL AND 849 FEET OF 4 INCH STEEL
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY
387 080.73283 (92)
INSTALL 900 FEET OF 2 INCH POLY AND ALONG GREY STREET AND ABANDON DISTRICT
REGULATOR STATION 01, 525 FEET OF 4 INCH POLY, 350 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DEPORT SYSTEM INTEGRITY
388 080.73288 (1,379)
INSTALL 1175 FEET OF 4 INCH POLY, 390 FEET OF 2 INCH POLY AND ABANDON DISTRICT
REGULATOR STATION 35, 230 FEET OF 4 INCH STEEL AND 460 FEET OF 2 INCH POLY AND
165 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS PARIS SYSTEM INTEGRITY
389 080.73297 (877)
RELOCATE FACILITIES. INSTALL 80 FEET OF 4 INCH POLY, 900 FEET OF 6 INCH POLY, 45
FEET OF 8 INCH POLY, 20 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 17
FEET 4 INCH STEEL, 53 FEET OF 6 INCH CAST IRON, 365 FEET OF 6 INCH STEEL, 459 FEET
OF 6 INCH POLY, 44 FEET OF 8 INCH STEEL, 12 FEET OF 2 INCH POLY, 55 FEET OF 4 INCH
POLY, 16 FEET OF 6 INCH STEEL TO ACCOMODATE THE CITY OF FORT WORTH SEWAR
PROJECT.ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
390 080.73300 (773)
INSTALL 2176 FEET OF 2 INCH POLY AND 1005 FEET OF 4 INCH POLY ALONG STREETS OF
HILLSBORO AND ABANDON 312 FEET OF 3 INCH POLY, 1355 FEET OF VARIOUS SIZE STEEL
AND 1582 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
391 080.73308 177
INSTALL 1,780 FEET OF 4 INCH, 30 FEET OF 6 INCH AND 60 FEET OF 2 INCH POLY AND
ABANDON 1,340 FEET OF 4 INCH, 30 FEET OF 6 INCH, 390 FEET OF 3 INCH, AND 80 FEET OF
2 INCH STEEL ALONG MULBERRY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS ARCHER CITY SYSTEM INTEGRITY
392 080.73315 (6,833)
INSTALL 2,200 FEET OF 6 INCH POLY ALONG CURTIS AND ALVORD IN QUANAH AND
ABANDON 2,000 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY
393 080.73322 (153,654)
INSTALL 3,135 FEET OF 8 INCH, 409 FEET OF 4 INCH, AND 2,358 FEET OF 2 INCH POLY
ALONG MACARTHUR BOULEVARD IN IRVING AND ABANDON 3,135 FEET OF 8 INCH, 494
FEET OF 4 INCH, AND 448 FEET OF 2 INCH STEEL AND 80 FEET OF 4 INCH, 229 FEET OF 2
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY
MTX Retirements
Page 11 of 45
511
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
394 080.73327 688
RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY ALONG PRESTON ROAD AND
ABANDON 292 FEET OF 4 INCH STEEL AND 49 FEET OF 4 POLY TO ACCOMODATE THE CITY
OF SHERMAN STREET IMPROVEMENT PROJECT. ALL CUSTOMERS VAN ALSTYNE RELOCATION OF FACILITIES
395 080.73329 (10,798)
RELOCATE FACILITIES.&NBSP; INSTALL 347 FEET OF 6 INCH POLY ALONG AVENUE A NEAR
4TH STREET AND ABANDON 226 FEET OF 6 INCH POLY DUE TO CITY OF TEMPLE PROJECT
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY
396 080.73342 (219,224)
INSTALL 123 FEET OF 4 INCH POLY ALONG 5TH STREET AND MAIN STREET AND ABANDON
FRISCO DISTRICT REGULATOR STATION #01, 64 FEET OF 4 INCH STEEL AND 3 FEET OF 4
INCH, 38 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS FRISCO SYSTEM INTEGRITY
397 080.73352 (250,920)
INSTALL 1,309 FEET OF 8 INCH STEEL ALONG SMOTHERMAN ROAD IN LITTLE ELM AND
ABANDON 1,266 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LITTLE ELM SYSTEM INTEGRITY
398 080.73358 1,792
RELOCATE FACILITIES. INSTALL 1900 FEET OF 4 INCH POLY ALONG SYMPHONY LANE AND
ABANDON 1900 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
399 080.73371 2,440
INSTALL 1950 FEET OF 2 INCH, 500 FEET OF 4 INCH AND 3950 FEET OF 6 INCH POLY AND
ABANDON 190 FEET OF 3 INCH, 2015 FEET OF 4 INCH, 450 FEET OF 4 INCH STEEL, 50 FEET
OF 6 INCH POLY, 4760 FEET OF 8 INCH POLY AND 390 FEET OF 8 INCH STEEL AND
DISTRICT REGULATOR STATION 93 ALONG SAMUEL BOULEVARD IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
400 080.73387 1,451
RELOCATE FACILITIES. INSTALL 910 FEET OF 6 INCH POLY ALONG LEGACY DRIVE AND
ABANDON 910 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF PLANO
IMPROVMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS PLANO RELOCATION OF FACILITIES
401 080.73388 (161)
RELOCATE FACILITIES. INSTALL 600 FEET OF 8 INCH POLY AND ABANDON 417 FEET OF 4
INCH STEEL AND 60 FEET OF 4 INCH POLY ALONG HIGHWAY 83-84 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE RELOCATION OF FACILITIES
402 080.73390 (22,455)
INSTALL 2,200 FEET OF 6 INCH POLY ALONG BLUE MOUND ROAD AND ABANDON 2,130
FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS HASLET SYSTEM INTEGRITY
403 080.73406 761
INSTALL 2400 FEET OF 2 INCH POLY ALONG EAST TRAVIS STREET AND ABANDON 1150
FEET OF 2 INCH POLY, 1280 FEET OF 2 INCH STEEL, DISTRICT REGULATOR STATION 01 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOLLAND SYSTEM INTEGRITY
404 080.73410 (2,142)
INSTALL 3,170 FEET OF 2 INCH POLY ALONG CHO STREET AND ABANDON 1015 FEET OF 4
INCH STEEL, 215 FEET OF 2 INCH STEEL, 525 FEET OF 2 INCH STEEL, 1005 FEET OF 2 INCH
POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
405 080.73411 (10,743)
INSTALL 950 FEET OF 4 INCH AND 3,700 FEET OF 2 INCH POLY ALONG THE STREETS OF
RICHLAND AVE AND BEE STREET IN FARMERS BRANCH AND ABANDON 950 FEET OF 4
INCH AND 3,700 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY
406 080.73413 (4,410)
INSTALL 594 FEET OF 4 INCH, 1,836 FEET OF 2 INCH POLY AND ABANDON 330 FEET OF 4
INCH STEEL, 394 FEET OF 3 INCH POLY, AND 145 FEET OF 2 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY
407 080.73430 (325)
RELOCATE FACILITIES. INSTALL 40 FEET OF 6 INCH POLY AND ABANDON 40 FEET OF 6
INCH POLY ALONG HICKIX ROAD. ALL CUSTOMERS ROWLETT RELOCATION OF FACILITIES
408 080.73442 (9,851)
INSTALL 1,072 FEET OF 4 INCH AND 1,617 FEET OF 2 INCH POLY ALONG STREETS OF
GRAND PRAIRIE AND ABANDON 378 FEET OF 4 INCH, 1410 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY
409 080.73450 (4,179)
INSTALL 1400 FEET OF 2 INCH POLY ALONG STREETS OF MEXIA AND ABANDON 1400 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY
410 080.73452 (2,969)
RELOCATE FACILITIES. INSTALL 1,380 FEET OF 2 INCH POLY ALONG WEST COMMERCE
AND ABANDON 1,465 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY
411 080.73453 (9,350)
INSTALL 1864 FEET OF 4 INCH AND 277 FEET OF 2 INCH POLY ALONG BARNETT STREET
AND ABANDON 1830 FEET OF 3 INCH AND 180 FEET OF 2 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY
412 080.73454 (15,917)
RELOCATE FACILITIES. INSTALL 1,933 FEET OF 4 INCH POLY ALONG NORTH STREET AND
538 FEET OF 2 INCH POLY ALONG ROBINSON AVENUE AND ABANDON 925 FEET OF 3 INCH
POLY, 135 FEET OF 2 INCH POLY, 410 FEET OF 2 INCH STEEL AND 95 FEET OF 3 INCH
STEEL IN ACCORDANCE WITH THE TEXAS RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY
413 080.73455 (20,097)
INSTALL 2,692 FEET OF 2 INCH POLY ALONG FORD ST AND COLLEGE STREET AND 429
FEET OF 4 INCH POLY ALONG 5TH STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY
414 080.73457 (15,694)
INSTALL 3,000 FEET OF 4 INCH, 200 FEET OF 2 INCH POLY ALONG CUSTER STREET IN
RICHARDSON AND ABANDON 1,000 FEET OF 4 INCH STEEL AND 2,000 FEET OF 4 INCH,
AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY
415 080.73460 (3,035)
RELOCATE FACILITIES.
INSTALL 1,550 FEET OF 2 INCH POLY ALONG PALESTINE STREET AND ABANDON 1,550
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS MEXIA SYSTEM INTEGRITY
416 080.73462 (7,562)
RELOCATE FACILITIES. INSTALL 1,400 FEET OF 2 INCH POLY ALONG MCCLENDON STREET
AND ABANDON 1,300 OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY
417 080.73468 2,945
INSTALL 4400 FEET OF 6 INCH POLY ABANDON 4100 FEET OF 2 INCH POLY AND 300 FEET
OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY
418 080.73479 4
INSTALL 2345 FEET OF 4 INCH STEEL AND ABANDON 992 FEET OF 2 INCH STEEL AND 1802
FEET OF 3 INCH STEEL ALONG PINE STREET IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE. ALL CUSTOMERS BRUCEVILLE EDDY SYSTEM INTEGRITY
419 080.73493 (60,152)
INSTALL 25 FEET OF 2 INCH AND 25 FEET OF 4 INCH POLY AND DISTRICT REGULATOR
STATION #08 ALONG PARKSIDE AND CROSBY AND ABANDON DISTRICT REGUALATOR
STATION AND 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH WITH THE RAILROAD
COMMISSION OF TEXAS RULE OF 8.209. ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY
420 080.73497 (115,926)
RELOCATE FACILIITES.&NBSP; INSTALL 2,648 OF 4 INCH POLY ALONG THE ALLEY OF
BELMONT AVENUE AND ABANDON 811 FEET OF 2 INCH, 739 FEET OF 4 INCH, AND 622
FEET OF 3 INCH, AND 76 FEET OF 8 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
421 080.73514 (174,429)
INSTALL 2,274 FEET OF 8 INCH AND 184 FEET OF 4 INCH POLY ALONG ROCHELLE ROAD
AND MACARTHUR BOULEVARD AND ABANDON 1,411 FEET OF 8 INCH, 233 FEET OF 4 INCH,
73 FEET OF 3 INCH STEEL AND 159 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY
422 080.73517 (47,490)
INSTALL 2,655 FEET OF 4 INCH, 970 FEET OF 2 INCH POLY ALONG CANADA DRIVE AND
ABANDON 1,884 FEET OF 6 INCH AND 729 FEET OF 2 INCH STEEL AND 660 FEET OF 4 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
423 080.73523 1
INSTALL 2100 FEET OF 8 INCH AND 1100 FEET OF 2 INCH POLY ALONG TRAIL LAKE DRIVE
AND ABANDON 2100 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
424 080.73531 (4,237)
INSTALL 725 FEET OF 12 INCH POLY AND ABANDON 710 FEET OF 10 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
425 080.73546 3
INSTALL 20 FEET OF 4 INCH POLY AND ABANDON 25 FEET OF 4 INCH POLY ALONG BLUFF
STREET.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
426 080.73557 (2,032)
INSTALL 900 FEET OF 8 INCH POLY ALONG THE STREETS OF DALLAS AND ABANDON 900
FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
427 080.73558 (17,739)
INSTALL 2,267 FEET OF 2 INCH POLY ALONG STREETS OF GRAND PRAIRIE AND ABANDON
339 FEET OF 4 INCH AND 1,938 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY
MTX Retirements
Page 12 of 45
512
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
428 080.73574 (0)
INSTALL 310 FEET OF 6 INCH POLY ALONG CEDAR AND ABANDON 297 FEET OF 6 INCH
CAST IRON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
429 080.73575 (52,733)
RELOCATE FACILITIES. INSTALL 1,848 FEET OF 4 INCH POLY ALONG PARK STREET AND
ABANDON 1,067 FEET OF 2 INCH AND 925 FEET OF 4 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
430 080.73576 (180)
INSTALL 1415 FEET OF 2 INCH POLY MAPLE STREET AND PINE STREET AND ABANDON
3270 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS GLENN HEIGHTS SYSTEM INTEGRITY
431 080.73579 (31,795)
RELOCATE FACILIITIES. INSTALL 1,345 FEET OF 2 INCH, 2,925 FEET OF 6 INCH, 21 FEET OF
.75 INCH ALONG ALTA MESA BOULEVARD AND ABANDON 950 FEET OF 1.25 INCH, 107 FEET
OF 2 INCH POLY AND 2,900 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
432 080.73586 453
INSTALL 2205 FEET OF 2 INCH POLY ALONG ORANGE STREET AND ABANDON 185 FEET OF
2 INCH POLY, 395 FEET OF 3 INCH POLY, 1760 FEET OF 2 INCH STEEL AND DISTRTICT
REGULATOR STATION 071 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
433 080.73587 (4,414)
RELOCATE FACILITIES.
INSTALL 1,691 FEET OF 4 INCH POLY ALONG PARK STREET AND ABANDON 764 FEET OF 3
INCH, 481 FEET OF 4 INCH, 245 FEET OF 2 INCH POLY AND 120 FEET OF 2 INCH STEEL,, 55
FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
434 080.73592 (13,757)
RELOCATE FACILITIES. INSTALL 1,296 FEET OF 4 INCH POLY ALONG GRAND AVE AND
ABANDON 745 FEET OF 4 INCH STEEL, 568 FEET OF 4 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
435 080.73593 (10,227)
INSTALL 642 FEET OF 4 INCH POLY AND 1926 FEET OF 2 INCH POLY ALONG STREETS OF
GRAND PRAIRIE AND ABANDON 779 FEET OF 4 INCH STEEL AND 1273 FEET OF 2 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSIN OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY
436 080.73601 2,893 INSTALL 230 FEET OF 4 INCH POLY ALONG STREETS OF WALMART. ALL CUSTOMERS DALLAS SYSTEM IMPROVEMENT
437 080.73614 (14,827)
RELOCATE FACILITIES. INSTALL 1364 FEET OF 4 INCH POLY ALONG MCFARLAND STREET
AND ABANDON 902 FEET OF 4 INCH POLY, 215 FEET OF 3 INCH STEEL TO ACCOMODATE
THE CITY OF KERRVILLE STREET IMPROVMENT PROJECT. ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES
438 080.73616 (3,191)
INSTALL 207 POLY SERVICE LINES AND ABANDON 207 STEEL SERVICE LINES IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
439 080.73618 (21)
INSTALL 1115 FEET OF 2 INCH POLY AND 870 FEET OF 4 INCH POLY ALONG STREETS OF
HILLSBORO AND ABANDON 770 FEET OF 2 INCH STEEL, 715 FEET OF 4 INCH STEEL, 155
FEET OF 4 INCH POLY AND 362 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
440 080.73626 4,234
RELOCATE FACILITIES. INSTALL 2630 FEET OF 2 INCH POLY ALONG CLINTON AVENUE AND
ABANDON 4315 FEET OF 2 INCH AND 125 FEET OF 1.25 INCH STEEL AND 380 FEET OF 2
INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
441 080.73641 89
RELOCATE FACILITIES. INSTALL 260 FEET OF 2 INCH POLY AND ABANDON 250 FEET OF 2
INCH POLY ALONG FOREST PARK BOULEVARD TO ACCOMODATE THE CITY OF FORT
WORTH STREET IMPROVMENT PROJECT IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
442 080.73655 (19,604)
INSTALL 2,050 FEET OF 2 INCH AND 887 FEET OF 4 INCH POLY ALONG THE STREETS OF
CITY OF WACO AND ABANDON 1,960 FEET OF 3 INCH AND 820 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
443 080.73657 (355)
INSTALL 765 FEET 2 INCH AND 1,955 FEET OF 4 INCH POLY ALONG N. 46TH STREET AND
ABANDON 1,010 FEET OF 2 INCH AND 2,295 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
444 080.73671 (19,924)
INSTALL 2,800 FEET OF 2 INCH POLY ALONG THE STREETS OF SQUIRE PLACE AND BEE
STREET AND ABANDON 2,800 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY
445 080.73672 (5,075)
RELOCATE FACILITIES. INSTALL 1,730 FEET OF 2 INCH POLY ALONG WEST MAIN AND
ABANDON 1,460 FEET OF 4 INCH, 200 INCH OF 3 INCH STEEL AND, 746 INCH OF 2 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY
446 080.73678 (18,078)
RELOCATE FACILITIES. INSTALL 325 FEET OF 2 INCH, 1,600 FEET OF 6 INCH POLY ALONG
ALTA MESA BLVD AND ABANDON 1,575 FEET OF 6 INCH, 300 FEET OF 1.25 INCH, AND 8
FEET OF .75 INCH OF STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE OF 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
447 080.73695 10,503
RELOCATE FACILITIES. ABANDON 770 FEET OF 4 INCH POLY ALONG INWOOD ROAD TO
ACCOMMODATE DEVELOPER INSTALLED PROJECT. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
448 080.73701 (21,517)
RELOCATE FACILITIES. INSTALL 2,500 FEET OF 2 INCH POLY ALONG BALLINGER AND
ABANDON 2,470 FEET OF 2 INCH POLY TO ACCOMODATE THE CITY OF GARLAND WATER,
DRAINAGE AND CONCRETE IMPROVEMENTS IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
449 080.73703 (1,598)
RELOCATE FACILITIES. INSTALL 1,700 FEET OF 2 INCH POLY ALONG EAST 4TH AND
ABANDON 1,140 FEET OF 2 INCH POLY TO ACCOMODATE THE CITY OF JOSHUA IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JOSHUA SYSTEM INTEGRITY
450 080.73720 (612)
INSTALL 1555 FEET OF 4 INCH POLY ALONG TRENTMAN STREET AND ABANDON 1452 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
451 080.73729 11,556
INSTALL 1320 FEET OF 2 INCH POLY ALONG 10TH STREET AND ABANDON 1200 FEET OF 2
INCH, 353 FEET OF 3 INCH AND 47 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA SYSTEM INTEGRITY
452 080.73730 428
RELOCATE FACILITIES. INSTALL 500 FEET OF 4 INCH POLY AND 100 FEET OF 2 INCH POLY
AND ABANDON 500 FEET OF 3 INCH STEEL AND 100 FEET OF 2 INCH STEEL ALONG
PREVOST TO ACCOMODATE THE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
453 080.73732 31
INSTALL 150 FEET OF 4 INCH AND 450 FEET OF 2 INCH POLY ALONG SOUTH 14TH AND
PEACH AND ABANDON 462 FEET OF 4 INCH STEEL AND 64 FEET OF 4 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
454 080.73741 (3,008)
INSTALL 1,200 FEET OF 4 INCH POLY AND ABANDON 3 INCH STEEL ALONG MACARTHUR
DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
455 080.73745 (13,695)
INSTALL 3,600 FEET OF 2 INCH AND 256 FEET OF 4 INCH POLY ALONG CAMP DRIVE AND
GRICE STRET IN WACO AND ABANDON 3,415 FEET OF 2 INCH AND 278 FEET OF 4 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
456 080.73753 (318,003)
INSTALL 700 FEET OF 2 INCH, 375 FEET OF 4 INCH, 3,250 FEET OF 6 INCH POLY ALONG
SOUTH HULEN STREET AND ABANDON 25 FEET OF 2 INCH POLY, 750 FEET OF 2 INCH, 110
FEET OF 4 INCH AND 2,950 FEET OF 6 INCH STEEL IN ACCORDANCE WITH TEXAS
RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
457 080.73755 (43,334)
RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH, 2,525 FEET OF 4 INCH POLY ALONG
WHISTLER DRIVE AND ABANDON 280 FEET OF 1.25 INCH AND 2,500 FEET OF 4 INCH STEEL
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8,209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
458 080.73761 (17,661)
RELOCATE FACILITIES. INSTALL 2,475 FEET OF 6 INCH AND 20 FEET OF 4 INCH POLY
ALONG KELLER HICKS ROAD AND ABANDON 2,200 FEET OF 4 INCH AND 150 FEET OF 6
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
459 080.73773 87,392
INSTALL 1914 FEET OF 4 INCH POLY ALONG MARTIN STREET AND ABANDON 1360 FEET OF
6 INCH POLY, 742 FEET OF 4 INCH POLY AND 214 FEET OF 2 INCH POLY IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
460 080.73784 (493)
RELOCATE FACILITIES. INSTALL 1583 FEET OF 2 INCH POLY ALONG EAST WARREN
STREET AND ABANDON 1234 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF HEWITT
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS HEWITT RELOCATION OF FACILITIES
461 080.73787 252
INSTALL 875 FEET OF 2 INCH POLY ALONG WEST MUNSON AND ABANDON 470 OF 4 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY
MTX Retirements
Page 13 of 45
513
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
462 080.73793 (5,758)
INSTALL 1,900 FEET OF 4 INCH AND 1,200 FEET OF 2 INCH POLY AND 200 FEET OF 8 INCH
STEEL CASING. ABANDON 1,900 FEET OF 4 INCH AND 1,200 FEET OF 2 INCH STEEL ALONG
RICHLAND AVENUE AND BEE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY
463 080.73807 (10,673)
INSTALL DISTRICT REGULATOR STATION 02, 390 FEET OF 2 INCH POLY AND 115 FEET OF 4
INCH POLY ALONG SMITHE ROAD AND ABANDON 390 FEET OF 2 INCH STEEL AND 115
FEET OF 3 INCH STEEL AND DISTRICT REGULATOR STATION 02 IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SCURRY SYSTEM INTEGRITY
464 080.73810 (1,891)
INSTALL 300 FEET OF 2 INCH, 2,900 FEET OF 4 INCH POLY ALONG WHEELOCK DRIVE IN
FORT WORTH AND ABANDON 2,800 FEET OF 2 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
465 080.73814 187
RELOCATE FACILITIES. INSTALL 1130 FEET OF 2 INCH POLY AND ABANDON 1130 FEET OF
2 INCH STEEL ALONG BOOKER T STREET TO ACCOMMODATE CITY OF FORT WORTH
STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
466 080.73837 (2,691)
INSTALL 2058 FEET OF 4 INCH POLY AND 273 FEET OF 2 INCH POLY ALONG STREETS OF
GRAND PRAIRIE AND ABANDON 497 FEET OF 4 INCH STEEL AND 1276 FEET OF 2 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY
467 080.73839 (114,327)
INSTALL 2,568 FEET OF 4 INCH POLY AND ABANDON 132 FEET OF 3 INCH, 18 FEET OF 4
INCH POLY, 111 FEET OF 3 INCH AND 2,899 FEET OF 4 INCH STEEL ALONG REDBUD DRIVE
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY
468 080.73840 (22,580)
RELOCATE FACILITIES. INSTALL 2,100 FEET OF 6 INCH POLY ALONG BUENA VISTA DRIVE
AND ABANDON 2,100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY
469 080.73841 (141,343)
INSTALL 2,684 FEET OF 3 INCH POLY AND ABANDON 2,684 FEET OF STEEL ALONG
ANDERSON STREET IN ACCORDANCE WITH RAILROAD COMMISISON OF TEXAS RULE
8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY
470 080.73842 (8,470)
INSTALL 2,710 FEET OF 2 INCH AND 400 FEET OF 6 INCH POLY AND ABANDON 1,870 FEET
OF 2 INCH, 133 FEET OF 4 INCH POLY, 419 FEET OF 2 INCH AND 350 FEET OF 4 INCH STEEL
ALONG HARMON ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSIOM OF TEXAS
RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY
471 080.73845 (10,366)
INSTALL 1,300 FEET OF 2 INCH POLY AND ABANDON 1,288 FEET OF 2 INCH POLY ALONG
HARMON ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY
472 080.73846 (37,833)
INSTALL 2,140 FEET OF 4 INCH POLY AND ABANDON 130 FEET OF 2 INCH POLY AND 977
FEET OF 3 INCH AND 1,357 FEET OF 4 INCH STEEL ALONG TREADWELL DRIVE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY
473 080.73847 (16,830)
INSTALL 2,301 FEET OF 4 INCH POLY AND ABANDON 2,301 FEET OF 4 INCH STEEL ALONG
SIMMONS STREET IN HURST IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY
474 080.73848 (18,557)
INSTALL 1,350 FEET OF 2 INCH POLY ALONG RIDGECREST DRIVE AND POST OAK DRIVE IN
HURST AND ABANDON 213 FEET OF 2 INCH, 1,004 FEET OF 3 INCH AND 1,550 FEET OF 4
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY
475 080.73849 (17,857)
INSTALL 1,000 FEET OF 2 INCH AND 1,050 FEET OF 4 INCH POLY ALONG CROSSTIMBER
DRIVE AND ABANDON 370 FEET OF 2 INCH AND 2,264 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY
476 080.73853 (3,762)
RELOCATE FACILITIES. INSTALL 145 FEET OF 2 INCH POLY ALONG C STREET AND
ABANDON 3/4 INCH POLY SERVICE IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS KERRVILLE RELOCATION OF FACILITIES
477 080.73859 (3,842)
RELOCATE FACILITIES. INSTALL 2,000 FEET OF 4 INCH POLY ALONG WRIGLEY WAY AND
ABANDON 1,950 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
478 080.73865 (37,160)
INSTALL 2,201 FEET OF 4 INCH POLY ALONG THE STREETS OF NW 16TH IN FORT WORTH
AND ABAONDON 764 FEET OF 4 INCH AND 394 FEET OF 6 INCH STEEL AND 669 FEET OF 3
INCH AND 371 FEET OF 2 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD
COMMISSION RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
479 080.73872 (9,407)
INSTALL DISTRICT REGULATOR STATION #01 IN THE CITY OF ROSEBUD AND ABANDON
DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS ROSEBUD SYSTEM INTEGRITY
480 080.73876 (8,267)
RELOCATE FACILITIES. INSTALL 245 FEET OF 2 INCH POLY ALONG HARRY HINES NEAR
HUNT STREET IN DALLAS AND ABANDON 245 FEET OF 2 INCH POLY. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
481 080.73883 (4,987)
INSTALL 2,250 FEET OF 2 INCH POLY ALONG WILTON DRIVE IN FORT WORTH AND
ABANDON 1,875 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
482 080.73885 (13,200)
ABANDON 760 FEET OF 1.25 INCH, 130 FEET OF 2 INCH AND 110 FEET OF 2 INCH POLY
WITH 980 FEET OF 2 INCH POLY ALONG IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
483 080.73890 472
INSTALL 1517 FEET OF 4 INCH POLY AND 730 FEET OF 2 INCH POLY ALONG TRENTMAN
STREET AND ABANDON 965 FEET OF 4 INCH STEEL, 610 FEET OF 2 INCH STEEL, 522 FEET
OF 4 INCH POLY AND 84 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
484 080.73892 (12,235)
INSTALL 2,750 FEET OF 2 INCH POLY AND ABANDON 2,725 FEET OF 2 INCH STEEL ALONG
THE STREETS OF WHITMAN AVE IN FORT WORTH IN ACCORDANCE WITH TEXAS
RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
485 080.73895 (37,314)
RELOCATE FACILITIES. INSTALL 1,885 FEET OF 2 INCH, 1,180 FEET OF 4 INCH OF POLY
ALONG GOULD ST AND ABANDON 601 FEET OF 1.25 INCH POLY AND, 351 FEET OF 2 INCH,
278 FEET OF 3 INCH STEEL, 1202 FEET OF 4 INCH POLY, 872 FEET OF 4 INCH AND 428
FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
486 080.73896 (9,671)
RELOCATE FACILIITIES. INSTALL 1,400 FEET OF 2 INCH POLY ALONG WEST BOWIE AND
ABANDON 1,540 ON 2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION
RULE 8.209.ALL CUSTOMERS MEXIA SYSTEM INTEGRITY
487 080.73897 (12,265)
INSTALL 500 FEET OF 4 INCH POLY ALONG LOOP 254 AND ABANDON 500 FEET OF 4 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER SYSTEM INTEGRITY
488 080.73903 (7,244)
INSTALL 3,425 FEET OF 2 INCH POLY ALONG WINIFRED DRIVE IN FORT WORTH AND
ABANDON 3,325 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
489 080.73908 (9,146)
INSTALL 1586 FEET OF 4 INCH AND 715 FEET OF 2 INCH POLY ALONG STREETS OF GRAND
PRAIRIE AND ABANDON 1529 FEET OF 4 INCH AND 973 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY
490 080.73914 (1)
INSTALL DISTRICT REGULATOR STATION, 25 FEET OF 2 INCH POLY AND 25 FEET OF 4
INCH POLY ALONG STREETS OF KEMP AND ABANDON DISTRICT REGULATOR STATION 06,
25 FEET OF 3 INCH STEEL AND 25 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEMP SYSTEM INTEGRITY
491 080.73938 (511)
RELOCATE FACILITIES. INSTALL 762 FEET OF 2 INCH POLY ALONG FM 932 AND ABANDON
355 FEET OF 2 INCH STEEL AND 390 FEET OF 2 INCH POLY TO ACCOMODATE TXDOT
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HAMILTON RELOCATION OF FACILITIES
492 080.73941 (14,920)
RELOCATE FACILITIES. INSTALL 3,200 FEET OF 2 INCH POLY ALONG MAIN AND ABANDON
442 FEET OF 2 INCH POLY, 750 FEET OF 2 INCH STEEL, 653 FEET OF 3 INCH STEEL, 263
FEET OF 4 INCH POLY AND 1092 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
493 080.73952 738
INSTALL 1845 FEET OF 2 INCH POLY AND 668 FEET OF 4 INCH POLY ALONG BROOKLINE
AVENUE AND ABANDON 1703 FEET OF 3 INCH STEEL, 421 FEET OF 2 INCH STEEL, 180
FEET OF 2 INCH POLY AND 22 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
494 080.73959 324
INSTALL 3350 FEET OF 2 INCH POLY ALONG STREETS OF DETROIT AND ABANDON 1715
FEET OF 3 INCH STEEL, 460 FEET OF 2 INCH STEEL, 355 FEET OF 2 INCH POLY AND
DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS DETROIT SYSTEM INTEGRITY
495 080.73965 (62,042)
INSTALL 1,083 FEET OF 4 INCH AND 1,544 FEET OF 2 INCH POLY ALONG THE STREETS OF
GRAND PRAIRIE AND ABANDON 1,443 FEET OF 4 INCH AND 573 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY
MTX Retirements
Page 14 of 45
514
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
496 080.73972 (3,762)
RELOCATE FACILITIES. INSTALL 2,617 FEET OF 4 INCH POLY ALONG E. FAIRFAX AVENUE
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
497 080.73979 (1,474)
RELOCATE FACILITIES.
INSTALL 40 FEET OF 4 INCH POLY ALONG COOPER LANE AND ABANDON 40 FEET OF 4
INCH POLY TO ACCOMMODATE THE CITY OF JOSHUA IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JOSHUA SYSTEM INTEGRITY
498 080.73983 (7,522)
INSTALL 1,200 FEET OF 4 INCH AND 2,450 FEET OF 2 INCH POLY ALONG HAVENHURST
STREET AND GOODLAND STREET IN FARMER BRANCH AND ABANDON 1,200 FEET OF 4
INCH AND 2,450 FEET 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY
499 080.73988 (14,583)
INSTALL 3,300 FEET OF 2 INCH POLY ALONG RICHLAND AVENUE AND DENNIS LANE IN
FARMERS BRANCH AND ABANDON 3,300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY
500 080.73994 (536,210)
RELOCATE FACILITIES. INSTALL 1,275 FEET OF 4 INCH, AND 1,367 FEET OF 2 INCH POLY
ALONG GRAND PRAIRIE NEIGHBORHOOD AND ABANDON 1,191 FEET OF 4 INCH STEEL,
1,025 FEET OF 2 INCH POLY IN ACCORDDANCE WITH THE RAILROAD COMMISSION OF
TEXAS 8.209.ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY
501 080.74000 (163,900)
RELOCATE FACILIITIES. INSTALL 2,362 FEET OF 4 INCH POLY ALONG ROCKWALL STREET
AND ABANDON DISTRICT REGULATOR STATION #05 AND 576 FEET OF 2 INCH STEEL, 7
FEET OF 3 INCH STEEL, 898 FEET OF 4 INCH STEEL, 10 FEET OF 2 INCH POLY, 637 FEET OF
3 INCH POLY, 63 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSON OF TEXAS RULE 8,209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY
502 080.74002 (45,096)
INSTALL 830 FEET OF 4 INCH POLY AND 840 FEET OF 2 INCH POLY ALONG STREETS OF
TERRELL AND ABANDON 908 FEET OF 2 INCH STEEL, 778 FEET OF 2 INCH POLY AND
DISTRICT REGULATOR STATION 15 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS TERRELL SYSTEM INTEGRITY
503 080.74003 (83,162)
INSTALL 2,200 OF 2 INCH POLY ALONG NORTH COLLEGE STREET AND ABANDON 2,000
FEET OF 2 INCH, 3 INCH, AND 4 INCH STEEL AND 6 INCH STEEL AND WAXAHACHIE
DISTRICT REGULATOR STATION #15 IN ACCORDANCE WITH&NBSP; RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY
504 080.74005 31
INSTALL 400 FEET OF 2 INCH POLY ALONG BENNETT STREET AND ABANDON DISTRICT
REGULATOR STATION 7 AND 400 FEET OF 3 INCH STEEL AND 30 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DETROIT SYSTEM INTEGRITY
505 080.74009 (11,591)
INSTALL 75 FEET OF 6 INCH, 2,450 FEET OF 4 INCH, 300 FEET OF 2 INCH POLY ALONG THE
STREETS OF KINGWOOD DRIVE AND ABANDON 55 FEET OF 6 INCH, 2,325 FEET OF 4 INCH
STEEL, AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD
COMMISSION RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
506 080.74011 (42,815)
INSTALL 2,365 FEET OF 2 INCH, 1,646 FEET OF 4 INCH POLY ALONG THE STREETS OF
HUBBY AND WATT AVENUE AND ABANDON 800 FEET OF 4 INCH STEEL AND 1,155 FEET OF
4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISISON OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
507 080.74027 (45)
INSTALL 1270 FEET OF 2 INCH POLY ALONG HIAWATCH BOULEVARD AND ABANDON 1212
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
508 080.74028 (3,141)
INSTALL 850 FEET OF 2 INCH POLY AND ABANDON 398 FEET OF 1.25 INCH STEEL AND 130
FEET OF 2 INCH POLY ALONG PAWHUSKA DR IN WICHITA FALLS, WICHITA COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
509 080.74031 (9,847)
INSTALL 875 FEET OF 2 INCH POLY AND ABANDON 800 FEET OF 2 INCH STEEL ALONG
HIAWATHA BLVD IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
510 080.74032 (7,039)
INSTALL 950 FEET OF 2 INCH POLY AND ABANDON 565 FEET OF 2 INCH STEEL AND 480
FEET OF 2 INCH POLY ALONG INDIAN HEIGHTS BLVD IN WICHITA FALLS, WICHITA COUNTY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
511 080.74038 (24,953)
INSTALL DISTRICT REGULATOR STATION #12, #23, #24 AND ABANDON DISTRICT
REGULATOR STATION #12, #23, #24 ALONG THE STREETS OF THE CITY OF TERRELL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY
512 080.74039 (18,782)
INSTALL 785 FEET OF 2 INCH, 160 FEET OF 6 INCH POLY ALONG ARTHUR AND AVE K IN
WICHITA FALLS AND ABANDON 116 FEET OF 6 INCH, 75 FEET OF 4 INCH POLY, 311 FEET
OF 4 INCH, 403 FEET OF 2 INCH AND 386 FEET OF 6 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
513 080.74040 (26,096)
INSTALL 875 FEET OF 2 INCH POLY ALONG GARFIELD AND AVENUE J IN WICHITA FALLS
AND ABANDON 467 FEET OF 2 INCH STEEL AND 1,021 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
514 080.74041 (20,243)
INSTALL 1,600 FEET OF 2 INCH POLY ALONG KESSLER AVENUE AND HAYES STREET AND
ABANDON 250 FEET OF 2 INCH, 1,035 FEET OF 4 INCH STEEL AND 458 FEET OF 2 INCH AND
430 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
515 080.74047 (2)
INSTALL DISTRICT REGULATOR STATION 35, 25 FEET OF 2 INCH POLY AND 25 FEET OF 4
INCH POLY IN GREENVILLE AND ABANDON DISTRICT REGULATOR STATION 35, 90 FEET OF
4 INCH AND 90 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY
516 080.74048 (61,163)
RELOCATE FACILITIES. INSTALL 305 FEET OF 2 INCH, 2,345 FEET OF 4 INCH POLY AND
ABANDON 2,185 FEET OF 4 INCH STEEL, 100 FEET OF 3 INCH POLY AND 305 FEET OF 2
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
517 080.74054 (15,870)
ABANDON 1,800 FEET OF 6 INCH STEEL TO ACCOMODATE OPTIMAIN PIPE REPLACEMENT
ALONG BYRON AND CORNELL AVENUE IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY
518 080.74078 77
ABANDON 271 FEET OF 3 INCH STEEL AND 222 FEET OF 3 INCH POLY ALONG NABERS IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY
519 080.74079 (1,686)
INSTALL 1693 FEET OF 2 INCH POLY AND 2005 FEET OF 4 INCH POLY ALONG EAST
BURLESON STREET AND ABANDON 715 FEET OF 2 INCH STEEL, 505 FEET OF 3 INCH
STEEL, 205 FEET OF 4 INCH STEEL, 425 FEET OF 4 INCH POLY, 100 FEET OF 3 INCH POLY
AND 650 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS MART SYSTEM INTEGRITY
520 080.74086 (12,624)
INSTALL 550 FEET OF 8 INCH AND 200 FEET OF 4 INCH POLY ALONG THE STREETS OF
MIDWAY AND SPRING VALLEY AND ABANDON 550 FEET OF 8 INCH STEEL AND 200 FEET
OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS ADDISON SYSTEM INTEGRITY
521 080.74087 (3,874)
INSTALL 685 FEET OF 2 INCH, 775 FEET OF 4 INCH POLY ALONG NORTHWEST 15TH
STREET AND ABANDON 898 FEET OF 3 INCH, 539 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH TEXAS RAILROAD COMMISSION OF RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
522 080.74098 (15,370)
RELOCATE FACILITIES. INSTALL 1,250 FEET OF 2 INCH POLY ALONG CHURCH STREET
AND ABANDON 570 FEET OF 2 INCH POLY, 400 FEET OF 2 INCH AND 860 FEET OF 6 INCH
STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
523 080.74114 (12,812)
INSTALL 4,238 FEET OF 4 INCH POLY ALONG HOLFORD ROAD AND ABANDON 4,149 FEET
OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
524 080.74119 (35,771)
INSTALL 2,157 FEET OF 2 INCH AND 1,721 FEET OF 4 INCH POLY ALONG FORT AVENUE
AND HUBBY AVENUE AND ABANDON 1,090 FEET OF 4 INCH, 317 FEET OF 3 INCH STEEL
AND 1,389 FEET OF 4 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION
RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY
525 080.74121 (157,029)
INSTALL 3,350 FEET OF 2 INCH POLY ALONG PEMBROKE DRIVE IN FORT WORTH AND
ABANDON 420 FEET OF 6 INCH AND 1,550 FEET OF 6 INCH, 3,300 FEET OF 4 INCH AND 79
FEET STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
526 080.74122 (892)
INSTALL 1028 FEET OF 4 INCH POLY ALONG STREETS OF FORT WORTH AND ABANDON
855 FEET OF 4 INCH STEEL, 158 FEET OF 3 INCH STEEL, 71 FEET OF 6 INCH STEEL AND 46
FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
527 080.74127 (4,101)
RELOCATE FACILITIES. INSTALL 310 FEET OF 4 INCH POLY ALONG FOREST LN AND
ABANDON 270 FEET OF 4 INCH POLY TO ACCOMODATE PLC/TXDOT. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
528 080.74136 421
RELOCATE FACILITIES. INSTALL 160 FEET OF 4 INCH POLY AND ABANDON 140 FEET OF 4
INCH STEEL ALONG LIVINGSTON DRIVE TO ACCOMMODATE CITY OF HURST STREET
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST RELOCATION OF FACILITIES
MTX Retirements
Page 15 of 45
515
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
529 080.74137 (14,231)
INSTALL 700 FEET OF 6 INCH, 1,200 FEET OF 4 INCH AND 650 FEET OF 2 INCH POLY ALONG
JOHNS WAY IN FORT WORTH AND ABANDON 700 FEET OF 6 INCH, 1,200 FEET OF 4 INCH
AND 400 FEET OF 2 INCH STEEL AND 250 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
530 080.74140 (2,133)
RELOCATE FACILITIES. INSTALL 880 FEET OF 2 INCH POLY AND ABANDON 880 FEET OF 2
INCH STEEL ALONG CROWN ROAD TO ACCOMODATE CITY OF FORT WORTH PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
531 080.74159 (13,964)
INSTALL 1,000 FEET OF 8 INCH POLY ALONG FISHER STREET, 3,255 FEET OF 4 INCH POLY
AND 200 FEET OF 2 INCH POLY ALONG LIND AND SPENCE STREETS AND ABANDON 190
FEET OF 1.25 INCH, 25 FEET OF 2 INCH POLY AND 735 FEET OF 2 INCH, 685 FEET OF 4
INCH STEEL, 1,050 FEET OF 4 INCH POLY, AND 650 FEET OF 6 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY
532 080.74174 (5,830)
INSTALL 3,575 FEET OF 2 INCH POLY ALONG FIESTA CIRCLE AND ABANDON 3,550 FEET OF
2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
533 080.74184 (3,745)
RELOCATE FACILITIES.
INSTALL 2,300 FEET OF 2 INCH POLY ALONG S. DENTON STREET AND ABANDON 2,300
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209 ALL CUSTOMERS MEXIA SYSTEM INTEGRITY
534 080.74188 (10,240)
INSTALL 1,936 FEET OF 2 INCH, 842 FEET OF 4 INCH AND 2,008 FEET OF 8 INCH POLY
ALONG JACKSON, 10TH, CLAY AND AUSTIN STREET IN KAUFMAN AND ABANDON 465 FEET
OF 4 INCH AND 417 FEET OF 2 INCH POLY AND 2,148 FEET OF 3 INCH, 1,126 FEET OF
2INCH STEEL ALL CUSTOMERS KAUFMAN SYSTEM INTEGRITY
535 080.74208 (3,120)
INSTALL 1690 FEET OF 2 INCH POLY ALONG NORTH MAIN STREET AND ABANDON 290
FEET OF 2 INCH AND 70 FEET OF 4 INCH POLY AND 1166 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY
536 080.74257 (6,810)
INSTALL 1,250 FEET OF 2 INCH AND 2,000 FEET OF 4 INCH POLY ALONG DENTON DRIVE
AND HAVENHURST STREET IN FARMERS BRANCH AND ABANDON 1,250 FEET OF 2 INCH
AND 2,000 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY
537 080.74259 (1,667)
INSTALL 1500 FEET OF 6 INCH POLY AND ABANDON 1200 FEET OF 3 INCH STEEL ALONG
WYCON DRIVE ALL CUSTOMERS WACO SYSTEM IMPROVEMENT
538 080.74260 (96,042)
RELOCATE FACILITIES. INSTALL 3,000 OF 4 INCH AND 1,500 OF 2 INCH POLY ALONG THE
STREETS OF FERRIS, TEXAS AND ABANDON 6,500 FEET OF 2 INCH, 3 INCH STEEL AND
ABANDON DISTRICT REGULATOR STATION 03 IN ACCAORDAINCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FERRIS SYSTEM INTEGRITY
539 080.74266 (6,264)
RELOCATE FACILITIES. INSTALL 1,696 FEET OF 2 INCH, 815 FEET OF 4 INCH POLY ALONG
SHACKLEFORD STREET AND ABANDON 1,687 FEET OF 2 INCH, 739 FEET OF 4 INCH STEEL
IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
540 080.74295 (158,378)
RELOCATE FACILITIES. INSTALL 2,990 FEET OF 4 INCH AND 690 FEET OF 2 INCH POLY
ALONG SHILOH ROAD AND ABANDON 2,850 FEET OF 8 INCH, 80 FEET OF 6 INCH, 80 FEET
OF 4 INCH, 560 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
541 080.74299 (102,314)
INSTALL 3,500 FEET OF 4 INCH, 1,500 FEET OF 2 INCH POLY ALONG ALMOND DRIVE AND
ABANDON 1,500 FEET OF 1.25 INCH, 3,300 FEET OF 2 INCH, 150 FEET OF 3 INCH AND 600
FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISISON OF TEXAS
RULE 8.209.ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY
542 080.74305 (18,496)
INSTALL 3,400 FEET OF 2 INCH POLY AND 100 FEET OF 4 INCH STEEL CASING ALONG W.
FANNIN STREET AND ABANDON DISTRICT REGULATOR STATION #18, 2,855 FEET OF 4
INCH, 379 FEET OF 3 INCH AND 40 FEET OF 2 INCH STEEL, AND 594 FEET OF 4 INCH, 437
FEET OF 3 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY
543 080.74312 (300)
INSTALL DISTRICT REGULATOR STATION 01 ALONG CHAMBERS STREET AND ABANDON
DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS NEWARK SYSTEM INTEGRITY
544 080.74313 (65,647)
RELOCATE FACILITIES.
INSTALL 3,110 FEET OF 4 INCH POLY ALONG HIGHWOOD DRIVE AND ABANDON 3,105 FEET
OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
545 080.74318 (9,836)
INSTALL DISTRICT REGULATOR STATION DRS01, 30 FEET OF 3 INCH, 12 FEET OF 2 INCH
STEEP AND 30 FEET OF 2 INCH POLY ALONG THE STREETS OF ODELL, WILBARGER
COUNTY.ALL CUSTOMERS ODELL SYSTEM INTEGRITY
546 080.74320 (29,311)
INSTALL DISTRICT REGULATOR STATION 04, 80 FEET OF 4 INCH POLY AND ABANDON
DISTRICT REGULATOR STATION 04, 210 FEET OF 4 INCH POLY, 59 FEET OF 4 INCH STEEL,
AND 37 FEET OF 4 INCH STEEL ALONG E 4TH STREET IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
547 080.74321 (19,366)
INSTALL 3,150 FEET OF 4 INCH AND 30 FEET OF 2 INCH POLY ALONG MOTLEY DRIVE
ALLEY AND ABANDON 2,490 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
548 080.74328 289
RELOCATE FACILITIES. INSTALL 700 FEET OF 4 INCH POLY ALONG WILLIAMSON DRIVE
AND ABANDON 700 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS BRYAN RELOCATION OF FACILITIES
549 080.74335 (4,893)
INSTALL 2,437 FEET OF 4 INCH POLY AND ABANDON 2,421 FEET OF 2 INCH STEEL ALONG
PECOS STREET IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
550 080.74340 466
INSTALL 775 FEET OF 2 INCH POLY ALONG SAN CARLOS AND ABANDON 590 FEET OF 2
INCH STEEL AND 100 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY
551 080.74341 (71,781)
INSTALL 1,800 FEET OF 2 INCH POLY ALONG AVENUE H AND ABANDON 2,170 FEET OF 4
INCH AND 80 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8,209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
552 080.74343 (38,698)
INSTALL 1,467 FEET OF 6 INCH, 1,773 FEET OF 4 INCH POLY AND ABANDON 1,467 FEET OF
6 INCH, 10 FEET OF 4 INCH, 1,763 FEET OF 3 INCH STEEL ALONG PARK ROW AVE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
553 080.74344 (18,935)
INSTALL 2,736 OF 4 INCH AND 635 FEET OF 2 INCH POLY AND ABANDON 2,696 FEET OF 3
INCH, 595 OF 2 INCH STEEL ALONG PARK ROW DRIVE IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
554 080.74345 (8,304)
RELOCATE FACILITIES. INSTALL 1,486 FEET OF 4 INCH AND 1,733 FEET OF 2 INCH POLY
AND ABANDON 875 FEET OF 4 INCH AND 1,117 FEET OF 2 INCH STEEL AND 611 FEET OF 4
INCH AND 616 FEET OF 2 INCH POLY ALONG THE STREETS OF MOORE, KELLY AND
HARMON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
555 080.74346 (78,806)
RELOCATE FACILITIES. INSTALL 1,657 FEET OF 4 INCH AND 1,178 FEET OF 2 INCH POLY
AND ABANDON 887 FEET OF 4 INCH, 770 FEET OF 3 INCH, 1,178 FEET OF 2 INCH STEEL
ALONG THE STREETS OF MEADOW, FORRESTAL AND KELLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
556 080.74347 (54,893)
RELOCATE FACILITIES. INSTALL 3,821 FEET OF 2 INCH POLY AND ABANDON 3,560 FEET
OF 2 INCH STEEL ALONG THE STREETS OF KELLY, FORRESTAL AND HARMONY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
557 080.74348 (31,134)
RELOCATE FACILIITES. INSTALL 2,160 FEET OF 4 INCH POLY AND ABANDON 2,160 FEET
OF 3 INCH STEEL ALONG CARSWELL TERRACE IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
558 080.74349 (44,129)
INSTALL 2,309 FEET OF 4 INCH, 1,151 FEET OF 2 INCH POLY ALONG WYNN TERRACE AND
BIGGS TERRACE IN ARLINGTON AND ABANDON 2,309 FEET OF 4 INCH, 1,126 FEET OF 2
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
559 080.74353 (130,060)
INSTALL 2,307 FEET OF 2 INCH AND 1,581 FEET OF 4 INCH POLY AND ABANDON 3,765 FEET
OF 4 INCH STEEL ALONG FORT AVE, HARLAN AVE, AND SANGER AVE IN WACO,
MCCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY
MTX Retirements
Page 16 of 45
516
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
560 080.74356 (288,276)
INSTALL 1,615 FEET OF 2 INCH AND 2,300 FEET OF 4 INCH POLY AND ABANDON 3,534 FEET
OF 4 INCH, 317 FEET OF 3 INCH STEEL AND 329 FEET OF 4 INCH AND 259 FEET OF 6 INCH
POLY ALONG THE STREETS OF WACO AND MORROW DRIVE IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
561 080.74362 (1,416)
INSTALL 1628 FEET OF 2 INCH POLY MAIN AND 768 FEET OF 4 INCH POLY MAIN ALONG
EAST COWAN STREET AND ABANDON 318 FEET OF 2 INCH POLY, 4 FEET OF 2 INCH STEEL,
1181 FEET OF 3 INCH STEEL, 167 FEET OF 4 INCH POLY AND 708 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY
562 080.74386 (12,155)
INSTALL DISTRICT REGULATOR STATION AND 190 FEET OF 6 INCH, 1150 FEET OF 2 INCH,
40 FEET OF 4 INCH POLY ALONG COLLEGE STREET AND ABANDON DISTRICT REGULATOR
STATION AND 3,135 FEET OF 6 INCH, 500 FEET OF 4 INCH, 610 FEET OF 3 INCH STEEL, 225
FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY
563 080.74402 (10,026)
INSTALL 1,112 FEET OF 4 INCH POLY AND ABANDON 195 FEET OF 2 INCH POLY AND 716
FEET OF 2 INCH, 103 FEET OF 3 INCH STEEL ALONG AUSTIN AND TRAVIS STREET IN
ACCORDANCE TO THE TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS ROANOKE SYSTEM INTEGRITY
564 080.74404 (5,320)
INSTALL 1,730 FEET OF 2 INCH POLY ALONG VINETTA DRIVE AND ABANDON 1,737 FEET OF
2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
565 080.74408 (462)
INSTALL 1825 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG CHICAGO STREET
AND ABANDON 110 FEET OF 2 INCH POLY AND 2465 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
566 080.74410 (35,181)
INSTALL 2,165 FEET OF 2 INCH AND 1,020 FEET OF 4 INCH POLY AND ABANDON 1,075 FEET
OF 6 INCH AND 2,085 FEET OF 3 INCH STEEL. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
567 080.74415 (23,782)
INSTALL 2,325 FEET OF 2 INCH AND 2,675 FEET OF 4 INCH POLY AND ABANDON 520 FEET
OF 6 INCH, 1,485 FEET OF 4 INCH, AND 2,995 FEET OF 3 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
568 080.74416 (44,585)
INSTALL 2, 325 FEET OF 2 INCH, 660 FEET OF 4 INCH POLY AND ABANDON 340 FEET OF 6
INCH, 2,990 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
569 080.74417 (17,764)
INSTALL 2,325 FEET OF 2 INCH AND 895 FEET OF 4 INCH POLY AND ABANDON 675 FEET OF
6 INCH, 2,355 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
570 080.74418 (45,235)
INSTALL 3,565 FEET OF 4 INCH POLY AND ABANDON 3,565 FEET OF 6 INCH STEEL IN THE
ALLEY SOUTH OF GROSS FROM FREEPORT TO LA PRADA IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
571 080.74419 (38,489)
INSTALL 3,565 FEET OF 2 INCH AND 325 FEET OF 4 INCH POLY AND ABANDON 325 FEET OF
6 INCH AND 3,460 FEET OF 3 INCH STEEL. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
572 080.74421 (26,617)
INSTALL 3,795 FEET OF 2 INCH AND 635 FEET OF 4 INCH POLY AND ABANDON 660 FEET OF
6 INCH, 3,600 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
573 080.74422 (40,543)
INSTALL 1,615 FEET OF 2 INCH AND 1,745 FEET OF 4 INCH POLY AND ABANDON 1,815 FEET
OF 4 INCH, 1,020 FEET OF 3 INCH, 650 FEET OF 2 INCH STEEL AND 10 FEET OF 2 INCH
POLY.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
574 080.74425 (8,861)
INSTALL 2,420 FEET OF 2 INCH POLY ALONG HIGHWOOD DRIVE AND ABANDON 2,420 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
575 080.74430 (3,903)
INSTALL 1,483 FEET OF 4 INCH POLY ALONG MOBERLY STREET AND ABANDON 1,397 FEET
ON 2 INCH STEEL AND 72 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
576 080.74433 (132,149)
INSTALL 100 FEET OF 4 INCH, 15 FEET OF 6 INCH AND 2,900 FEET OF 8 INCH POLY AND
ABANDON 2,170 FEET OF 8 INCH, 150 FEET OF 6 INCH, 120 FEET OF 3 INCH, 130 FEET OF 2
INCH STEEL AND 50 FEET OF 3 INCH POLY ALONG SOUTH POLK IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
577 080.74435 (1,075)
RELOCATE FACILITIES. INSTALL 780 FEET OF 2 INCH POLY AND ABANDON 760 FEET OF 2
INCH STEEL ALONG JEFFERSON STREET TO ACCOMMODATE CITY OF COCKRELL HILL
STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COCKRELL HILL RELOCATION OF FACILITIES
578 080.74439 (22,388)
INSTALL 2,334 FEET OF 2 INCH POLY ALONG TIMBERVIEW AND ABANDON 2,310 FEET OF 3
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
579 080.74440 (21,043)
INSTALL 2,455 FEET OF 4 INCH POLY ALONG RUTZ AND ABANDON 1,950 FEET OF 2 INCH ,
355 FEET OF 1.25 INCH POLY AND 60 FEET OF 1.25 STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
580 080.74441 (14,604)
INSTALL 1,660 FEET OF 2 INCH POLY ALONG CHIHUAHUA AND ABANDON 1,890 FEET OF 2
INCH STEEL AND 395 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
581 080.74442 (8,346)
INSTALL 3,090 FEET ON 2 INCH, 515 FEET OF 4 INCH POLY ALONG KRAT STREET AND
ABANDON 3,820 FEET OF 2 INCH, STEEL AND 190 FEET OF 2 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
582 080.74443 30,624
INSTALL 2,925 FEET OF 2 INCH POLY ALONG MERRELL STREET AND ABANDON 2,335 FEET
OF 4 INCH, 65 FEET OF 3 INCH, 645 FEET OF 2 INCH STEEL AND 25 FEET OF 4 INCH POLY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
583 080.74450 (5,100)
RELOCATE FACILITIES. INSTALL 275 FEET OF 4 INCH AND 85 FEET OF 2 INCH POLY ALONG
KENLEY STREET AND ABANDON 275 FEET OF 4 INCH AND 130 FEET OF 2 INCH STEEL TO
ACCOMMODATE THE CITY OF FORT WORTH PROJECT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
584 080.74454 (43,490)
INSTALL 2,664 FEET OF 4 INCH POLY AND ABANDON 2,664 FEET OF 3 INCH STEEL ALONG
CONNALLY TERRACE SUBDIVISION IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
585 080.74457 (2)
RELOCATE FACILITIES. INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 299 FEET OF 4
INCH POLY AND 84 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY PAVING PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON RELOCATION OF FACILITIES
586 080.74458 (23,383)
INSTALL 2,125 FEET OF 2 INCH POLY AND ABANDON 2,020 FEET OF 2 INCH STEEL AND 100
FEET OF 2 INCH POLY ALONG THE STREETS OF BIGGS TERRACE AND BIGGS CIRCLE IN
ACCORDANE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
587 080.74459 (23)
INSTALL DISTRICT REGULATOR STATION 18 ALONG BAIRD STREET AND ABANDON
DISTRICT REGULATOR STATION 18 IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY
588 080.74466 (26,218)
INSTALL 2,519 FEET OF 8 INCH POLY ALONG FISHER STREET AND 1,300 FEET OF 4 INCH
POLY ALONG HODGE STREET AND ABANDON 135 FEET OF 4 INCH, 140 FEET OF 2 INCH,
115 FEET OF 3 INCH, 330 FEET OF 6 INCH POLY AND 490 FEET OF 2 INCH, 445 FEET OF 3
INCH, AND 1,625 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY
589 080.74471 (173,338)
INSTALL 2,600 FEET OF 8 INCH, 505 FEET OF 2 INCH, AND 100 FEET OF 4 INCH POLY AND
ABANDON 2,620 FEET OF 8 INCH, 485 FEET OF 4 INCH AND 565 FEET OF 3 INCH STEEL
ALONG POLK FROM CAMP WISDOM SOUTH IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
590 080.74475 (15,899)
INSTALL 2,795 FEET OF 2 INCH POLY ALONG SOUTH BAUGH STREET AND ABANDON 2,745
FEET OF 2 INCH STEEL AND 720 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS ALVARADO SYSTEM INTEGRITY
591 080.74477 (101)
RELOCATE FACILITIES. INSTALL 160 FEET OF 2 INCH POLY AND ABANDON ONE 1.25 INCH
POLY ALONG OLDHAM LANE. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
592 080.74490 (9,498)
INSTALL 1,200 FEET OF 2 INCH , 1,130 FEET OF 4 INCH POLY ALONG COWAN STREET AND
ABANDON 16 FEET OF 2 INCH STEEL, 160 FEET OF 3 INCH POLY, 1,170 FEET OF 3 INCH
STEEL, 120 FEET OF 4 INCH POLY, 1,045 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS MART SYSTEM INTEGRITY
593 080.74491 94
RELOCATE FACILITIES. INSTALL 180 FEET OF 4 INCH AND 26 FEET OF 2 INCH POLY AND
ABANDON 180 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DALLAS TXDOT
ROADWAY PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
594 080.74501 6,661
RELOCATE FACILITIES. INSTALL 1000 FEET OF 2 INCH POLY AND ABANDON 1000 FEET OF
2 INCH POLY ALONG CINNABAR DRIVE TO ACCOMODATE CITY OF DALLAS STREET
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
MTX Retirements
Page 17 of 45
517
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
595 080.74511 (47,251)
INSTALL 2,910 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 4 INCH, 2215 FEET OF 3
INCH AND 375 FEET OF 8 INCH STEEL ALONG THE STREETS OF COOGAN DRIVE AND
ROYAL LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
596 080.74514 (25,676)
INSTALL 3,395 FEET OF 2 INCH POLY NEAR THE INTERSECTION OF ALLEGHENY DRIVE
AND COOGAN DRIVE AND ABANDON 902 FEET OF 2 INCH, 2,790 FEET OF 3 INCH STEEL
AND 300 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
597 080.74515 (24,425)
INSTALL 3,270 FEET OF 2 INCH AND 1,010 FEET OF 4 INCH POLY AND ABANDON 575 FEET
OF 2 INCH, 2,325 FEET OF 3 INCH AND 1,005 FEET OF 6 INCH STEEL ALONG THE ALLEY
NORTH AND SOUTH OF FLOWERDALE LANE IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
598 080.74532 (80,783)
INSTALL 1,635 FEET OF 2 INCH AND 1,915 FEET OF 4 INCH POLY ALONG WOODWIND
STREET AND ABANDON 1,100 FEET OF 2 INCH, 1,815 FEET OF 4 INCH AND 430 FEET OF 6
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
599 080.74535 (27,017)
ABANDON DISTRICT REGULATOR STATION # 175, 5 FEET OF 3 INCH, 20 FEET OF 4 INCH
AND 10 FEET OF 6 INCH STEEL ALONG MAY STREET IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
600 080.74539 (3,288,679)
INSTALL 3,000 FEET OF 16 INCH STEEL AND ABANDON 3,000 FEET OF 16 INCH STEEL
ALONG ALEMEDA STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
601 080.74545 (23,144)
INSTALL 3,750 FEET OF 2 INCH POLY ALONG KRAFT STREET AND ABANDON 3,175 FEET OF
2 INCH AND 105 FEET OF 1.25 INCH STEEL AND 470 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
602 080.74553 (10,419)
ABANDON 4,101 FEET OF 6 INCH AND 2,135 FEET OF 2 INCH STEEL ALONG THE STREETS
OF WILMER IN DALLAS COUNTY. ALL CUSTOMERS WILMER RELOCATION OF FACILITIES
603 080.74556 (1,317)
INSTALL 2585 FEET OF 2 INCH POLY ALONG SHAW STREET AND ABANDON 2555 FEET OF 2
INCH STEEL AND 30 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
604 080.74559 1,422
INSTALL 2600 FEET OF 2 INCH POLY ALONG LIFE AVENUE AND ABANDON 2515 FEET OF 2
INCH STEEL AND 80 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
605 080.74565 (2,184)
INSTALL 3,288 FEET OF 4 INCH, 5 FEET OF 2 INCH POLY ALONG OLD LIMESTONE COUNTY
ROAD AND ABANDON 202 FEET OF 2 INCH, 2,055 FEET OF 4 INCH STEEL AND 1,025 FEET
OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS MART SYSTEM INTEGRITY
606 080.74568 (27,620)
INSTALL 2,500 FEET OF 2 INCH AND 1,150 FEET OF 4 INCH POLY ALONG GRIM AVENUE
AND GORMAN AVENUE IN WACO AND ABANDON 2,100 FEET OF 2 INCH, 740 FEET OF 4
INCH STEEL AND 302 FEET OF 2 INCH AND 470 FEET OF 4 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
607 080.74571 (38,466)
INSTALL 175 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY AND DISTRICT REGULATOR
STATION #01 AND ABANDON 375 FEET OF 3 INCH STEEL AND DISTRICT REGULATOR
STATION #01 ALONG MAIN STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS SAINT JO SYSTEM INTEGRITY
608 080.74572 (16,719)
INSTALL DISTRICT REGULATOR STATION #02 ALONG SOUTH LINE STREET IN SAINT JO
AND ABANDON DISTRICT REGULATOR STATION #02 IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAINT JO SYSTEM INTEGRITY
609 080.74575 (167,352)
INSTALL 1,880 FEET OF 2 INCH POLY ALONG HOUSTON STREET AND CUTLER STREET IN
TIOGA AND ABANDON DISTRICT REGULATOR STATION #01 AND 947 FEET OF 4 INCH, 3
FEET OF 3 INCH STEEL AND 1,380 FEET OF 4 INCH AND 61 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TIOGA SYSTEM INTEGRITY
610 080.74580 673
INSTALL DISTRICT REGULATOR STATION 01 ALONG WEST MAIN STREET AND ABANDON
DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS BELLS SYSTEM INTEGRITY
611 080.74582 (3,698)
INSTALL DISTRICT REGULATOR STATION #06 AT INTERSECTION OF NORTH BOND STREET
AND EAST ALAMEDA STREET IN IOWA PARK AND ABANDON REGULATOR DISTRICT
STATION #06 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY
612 080.74583 (16,828)
INSTALL DISTRICT REGULATOR STATION #07 AT THE INTERSECTION OF NORTH
COLORADO STREET AND WEST TEXAS AVENUE IN IOWA PARK AND ABANDON DISTRICT
REGULATOR STATION #07 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS IOWA PARK SYSTEM INTEGRITY
613 080.74586 (49,164)
INSTALL DISTRICT REGULATOR STATION #101 AND 125 FEET OF 2 INCH AND 50 FEET OF 4
INCH POLY ALONG PARK STREET AND ABANDON 20 FEET OF 2 INCH, 50 FEET OF 4 INCH
POLY AND 10 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION #101 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
614 080.74591 (31,744)
INSTALL 325 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #53 ALONG
NORTH BROADWAY STREET AND ABANDON 19 FEET OF 3 INCH, 303 FEET OF 4 INCH, AND
16 FEET OF 6 INCH POLY AND 41 FEET OF 3 INCH AND 12 FEET OF 4 INCH STEEL AND
DISTRICT REGULATOR STATION #53 IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
615 080.74592 (13,765)
INSTALL 975 FEET OF 2 INCH AND 45 FEET OF 4 INCH POLY AND DISTRICT REGULATOR
STATION #20 ALONG 15TH STREET AND ABANDON 1,125 FEET OF 4 INCH, 23 FEET OF 2
INCH POLY AND 109 FEET OF 4 INCH, 25 FEET OF 8 INCH AND 385 FEET OF 2 INCH STEEL
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
616 080.74599 (4,211)
INSTALL DISTRICT REGULATOR STATION #25 AT THE INTERSECTION OF NORTH AVENUE B
AND EAST MAIN STREET IN OLNEY AND ABANDON DISTRICT REGULATOR STATION #25 IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY SYSTEM INTEGRITY
617 080.74601 4,938
INSTALL 290 FEET OF 2 INCH POLY AND 150 FEET OF 4 INCH POLY AND ABANDON 460
FEET OF 2 INCH POLY AND 140 FEET OF 3 INCH POLY ALONG AMHERST DRIVE TO
ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY
618 080.74603 (2,251)
INSTALL DISTRICT REGULATOR STATION #08 ALONG HUGHES STREET IN QUANAH AND
ABANDON DISTRICT REGULATOR STATION #08 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY
619 080.74604 (3,271)
INSTALL DISTRICT REGULATOR STATION #13 AND 500 FEET OF 2 INCH, 45 FEET OF 4 INCH
POLY ALONG MERCER STREET IN QUANAH AND ABANDON DISTRICT REGULATOR
STATION #13 AND 133 FEET OF 2 INCH AND 37 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY
620 080.74606 (30,979)
INSTALL DISTRICT REGULATOR STATION #01 ALONG ALBERT BROADFOOT STREET IN
BONHAM AND ABANDON DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH THE
RAILROAD COMMSSION TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY
621 080.74609 (3,072)
INSTALL DISTRICT REGULATOR STATION #20 AND ABANDON DISTRICT REGULATOR
STATION #20 IN DENISON, GRAYSON COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY
622 080.74610 (49,203)
INSTLL 30 FEET OF 2 INCH AND 40 FEET OF 4 INCH POLY AND DISTRICT REGULATOR
STATION #04 ALONG WEST FERN STREET AND NORTH WOODS STREET IN SHERMAN AND
ABANDON DISTRICT REGULATOR STATION #04. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY
623 080.74615 (3,369)
INSTALL 2550 FEET OF 4 INCH AND 135 FEET OF 2 INCH POLY ALONG THE STREETS OF
DALLAS AND ABANDON 2570 FEET OF 2 INCH STEEL AND 75 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
624 080.74617 (1,696)
INSTALL 870 FEET OF 4 INCH POLY ALONG SHEPHERD STREET AND ABANDON 847 FEET
OF 4 INCH STEEL ADN 25 FEET OF 4 INCH POLY TO ELIMINATE UNREPAIRABLE LEAK IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY
625 080.74623 (4,534)
INSTALL 1,812 FEET OF 4 INCH, 510 FEET OF 2 INCH POLY ALONG MOBERLY STREET AND
ABANDON 2,282 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
626 080.74625 3,810
INSTALL 1480 FEET OF 2 INCH POLY ALONG HOMELAND STREET AND ABANDON 1285 FEET
OF 2 INCH STEEL AND 200 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
627 080.74631 (658)
RELOCATE FACILITIES. RELOCATE 11 SERVICE LINES IN THE CITY OF KELLER IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY
MTX Retirements
Page 18 of 45
518
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
628 080.74633 (102)
RELOCATE FACILITIES. INSTALL 501 FEET OF 4 INCH POLY AND ABANDON 501 FEET OF
STEEL ALONG PEARSON LANE.
INSTALL 107 FEET OF 2 INCH POLY AND ABANDON 170 FEET OF 2 INCH STEEL ALONG
BOURLAND ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS KELLER SYSTEM INTEGRITY
629 080.74636 (17,448)
RELOCATE FACILITIES. INSTALL 45 FEET OF 2 INCH POLY AND ABANDON 45 FEET STEEL
ALONG CHANDLER ROAD. INSTALL 67 FEET OF 4 INCH POLY AND ABANDON 67 FEET OF 4
INCH STEEL ALONG SOUTH PATE ORR ROAD IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY
630 080.74642 (19,579)
INSTALL 790 FEET OF 2 INCH AND 3,150 FEET OF 4 INCH POLY ALONG MEREDITH FROM
SOUTH COCKRELL HILL TO SOUTH GILPIN AVENUE IN DALLAS AND ABANDON 250 FEET OF
2 INCH AND 3,700 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
631 080.74643 (1,743)
INSTALL 1,000 FEET OF 2 INCH POLY ALONG PINE STREET AND ABANDON 460 FEET OF 4
INCH STEEL, AND 25 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM SYSTEM INTEGRITY
632 080.74647 (15,452)
INSTALL 1,790 FEET OF 2 INCH AND 635 FEET OF 4 INCH POLY AND ABANDON 1,790 FEET
OF 2 INCH AND 635 FEET OF 4 INCH STEEL ALONG SOUTH GILPIN IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
633 080.74648 (19,920)
INSTALL 1,550 FEET OF 8 INCH POLY ALONG DAVIS STREET, INSTALL 1,295 FEET OF 2
INCH POLY ALONG CRANFORD STREET AND ABANDON 440 FEET OF 4 INCH POLY, 610
FEET OF 4 INCH, 390 FEET OF 3 INCH, 110 FEET OF 2 INCH 1,665 FEET OF 6 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY
634 080.74650 (24,533)
INSTALL 1,370 FEET OF 2 INCH AND 5,055 FEET OF 4 INCH POLY AND ABANDON 54 FEET
OF 1.25 INCH, 3,295 FEET OF 2 INCH, 320 FEET OF 3 INCH , AND 6,639 FEET OF 4 INCH
STEEL, 915 FEET OF 4 INCH, 1,937 FEET OF 2 INCH POLY ALONG THE STREETS OF THE
CITY OF GORMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORMAN SYSTEM INTEGRITY
635 080.74657 (24,033)
INSTALL 1,320 FEET OF 4 INCH POLY AND ABANDONING 1,312 FEET OF 4 INCH STEEL
ALONG THE ALLEY OF LAGONA AVE AND DENVER AVE IN ACCORDANCE WITH TEXAS
RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
636 080.74664 (18,970)
INSTALL 3,090 FEET OF 2 INCH POLY ALONG LARRY DRIVE ALLEY AND ABANDON 3,090
FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
637 080.74665 (18,791)
INSTALL 3,140 FEET OF 2 INCH POLY AND ABANDON 1,700 FEET OF 3 INCH, 1440 FEET OF
3 INCH STEEL ALONG HEALEY DRIVE ALLEY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
638 080.74666 (20,602)
INSTALL 3,775 FEET OF 2 INCH POLY AND ABANDON 3,775 FEET OF 2 INCH STEEL ALONG
ORLANDO COURT AND MATHER COURT IN ACCORDANCE WITH RAILROAD COMMISION OF
TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
639 080.74669 (11,636)
INSTALL 2,247 FEET OF 2 INCH POLY ALONG MILBY ROAD AND ABANDON 300 FEET OF 2
INCH STEEL AND 1,855 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
640 080.74671 (11,042)
INSTALL 2,853 FEET OF 2 INCH POLY ALONG JAMES STREET AND GARDEN PARK COURT
AND ABANDON 1,675 FEET OF 2 INCH STEEL AND 755 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
641 080.74672 (32,845)
INSTALL 3,081 FEET OF 2 INCH POLY ALONG CALES DRIVE AND ABANDON 2,650 FEET OF 2
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
642 080.74673 (9,053)
INSTALL 2,518 FEET OF 2 INCH POLY ALONG PONTIAC DRIVE AND ABANDON 1,460 FEET
OF 3 INCH, 535 FEET OF 4 INCH STEEL, 670 FEET OF 4 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
643 080.74674 (31,775)
INSTALL 1,931 FEET OF 4 INCH AND 1,018 FEET OF 2 INCH POLY ALONG STRAIT LANE AND
MIBLY ROAD AND ABANDON 1,455 FEET OF 3 INCH STEEL, AND 210 FEET OF 3 INCH, 1,140
FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
644 080.74675 (35,663)
INSTALL 1,469 FEET OF 4 INCH AND 877 FEET OF 2 INCH POLY ALONG CLOVER PARK
DRIVE AND ABANDON 1,380 FEET OF 4 INCH, 480 FEET OF 2 INCH STEEL, 100 FEET OF 2
INCH AND 320 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
645 080.74676 (31,174)
INSTALL 922 FEET OF 4 INCH AND 1,917 FEET OF 2 INCH POLY ALONG PONTIAC DRIVE
AND LOMBARDY LANE IN ARLINGTON AND ABANDON 1,905 FEET OF 3 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
646 080.74677 (59,505)
INSTALL 2,667 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY ALONG PECANDALE DRIVE
AND WAGGONER DRIVE IN ARLINGTON AND ABANDON 2,660 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
647 080.74678 (106,235)
INSTALL 2,345 FEET OF 4 INCH AND 847 FEET OF 2 INCH POLY ALONG RAVENWOD DRIVE,
PONTIAC DRIVE AND WESTVIEW TERRACE IN ARLINGTON. ABANDON 2,360 FEET OF 4
INCH AND 590 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
648 080.74679 (73,459)
INSTALL 1,320 FEET OF 4 INCH AND 938 FEET OF 2 INCH POLY ALONG ARTHUR DRIVE AND
SHERWOOD DRIVE AND ABANDON 1,305 FEET OF 4 INCH, 520 FEET OF 3 INCH AND 115
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
649 080.74680 (31,461)
INSTALL 1,598 FEET OF 4 INCH AND 1,506 FEET OF 2 INCH POLY ALONG EASY STREET,
VALLEY AVE AND WESTCREST DRIVE IN ARLINGTON AND ABANDON 1,600 FEET OF 4
INCH, 1,050 FEET OF 3 INCH AND 220 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
650 080.74681 (23,106)
INSTALL 2,402 FEET OF 4 INCH POLY ALONG WAGGONER DRIVE, WHITNEY LANE AND
TURPIN DRIVE IN ARLINGTON AND ABANDON 2,335 FEET OF 4 INCH STEEL AND 55 FEET
OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
651 080.74682 (38,223)
INSTALL 1,221 FEET OF 4 INCH AND 321 FEET OF 2 INCH POLY ALONG DUNCAN COURT
AND RAVENWOOD DRIVE IN ARLINGTON. ABANDON 1,140 FEET OF 4 INCH AND 320 FEET
OF 2 INCH STEEL, 80 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
652 080.74684 (30,741)
INSTALL 4,435 FEET OF 2 INCH POLY ALONG SOUTH RANDOLPH DRIVE AND ABANDON
4,405 FEET OF 2 INCH STEEL AND 30 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
653 080.74692 (998)
RELOCATE FACILITIES. RELOCATE 147 FEET OF 2 INCH, 30 FEET OF 6 INCH POLY AND
ABANDON 22 FEET OF 6 INCH POLY ALONG CALDWELLS LANE AND RUSSELL STREET IN
PFLUGERVILLE, TRAVIS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS PFLUGERVILLE SYSTEM INTEGRITY
654 080.74693 (25,141)
INSTALL 1,739 FEET OF 4 INCH POLY ALONG THE ALLEY OF GOULD AVENUE AND DENVER
AVENUE AND ABANDON 1,341 FEET OF 4 INCH, 451 FEET OF 6 INCH STEEL IN ACCORANCE
WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
655 080.74703 23,906
INSTALL 2,800 FEET OF 8 INCH AND 30 FEET OF 4 INCH POLY AND ABANDON 2,690 FEET
OF 8 INCH, 30 FEET OF 4 INCH STEEL AND 85 FEET OF 8 INCH POLY ALONG CAMP WISDOM
AND BLUEWOOD ROAD IN ACCORDANCE WITH RAILROAD COMMISISON OF TEXAS RULE
8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
656 080.74704 (22,764)
INSTALL DISTRICT REGULATOR STATION #01 ALONG WEST WICHITA STREET AND COWAN
STREET IN BOWIE AND ABANDON DISTRICT REGULATOR STATION #01 IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE SYSTEM INTEGRITY
657 080.74705 (30,763)
INSTALL DISTRICT REGULATOR STATION #03 ALONG NORTH MILL STREET AND EAST
NELSON STREET IN BOWIE AND ABANDON DISTRICT REGULATOR STATION #03 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE SYSTEM INTEGRITY
658 080.74706 (8,980)
INSTALL DISTRICT REGULATOR STATAION #09 ALONG HIGHWAY 59 SOUTH AND US
HIGHWAY 287 IN BOWIE AND ABANDON DISTRICT REGULATOR STATION #09 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE SYSTEM INTEGRITY
659 080.74709 (55,630)
INSTALL 2,360 FEET OF 2 INCH AND 215 FEET OF 4 INCH POLY AND ABANDON 2,345 FEET
OF 3 INCH, 215 FEET OF 4 INCH STEEL AND 15 FEET OF 3 INCH POLY ALONG THE ALLEY
BETWEEN BLUEWOOD AND CLEARWOOD IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
660 080.74710 (421)
RELOCATE FACILITIES. INSTALL 2150 FEET OF 6 INCH AND 20 FEET OF 4 INCH POLY
ALONG WEST BAILEY BOSWELL ROAD AND ABANDON 1950 FEET OF 4 INCH STEEL, 100
FEET OF 4 INCH AND 70 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF FORT
WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
MTX Retirements
Page 19 of 45
519
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
661 080.74715 (54,152) PROCEEDS FROM FY2022 VEHICLE SALES IN DALLAS. ALL CUSTOMERS SYSTEM WIDE GENERAL PLANT - EQUIPMENT
662 080.74719 (78,333)
INSTALL 1,450 FEET OF 4 INCH, 30 FEET OF 2 INCH AND 10 FEET OF 4 INCH STEEL AND
DISTRICT REGULATOR STATION #02 ALONG WEST AVENUE E AND ALLEY BETWEEN 5TH
AND 7TH STREET IN MIDLOTHIAN AND ABANDON 365 FEET OF 4 INCH STEEL AND 535 FEET
OF 4 INCH, 770 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #02 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY
663 080.74726 (12,808)
RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY ALONG MEACHAM BOULEVARD
AND ABANDON 400 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH
STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISISON OF TEXAS RULE
8.209.ALL CUSTOMERS HALTOM CITY RELOCATION OF FACILITIES
664 080.74739 (6,086)
INSTALL 1,175 FEET OF 4 INCH, 2,800 FEET OF 2 INCH POLY AND ABANDON 2,675 FEET OF
2 INCH STEEL ALONG SAMBROSA LANE IN ACCORDANCE WITH RAILROAD COMMISION OF
TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
665 080.74746 (13,800)
INSTALL 1,400 FEET OF 8 INCH POLY AND ABANDON 1,400 OF 4 INCH POLY ALONG
CHALLENGER ROAD.ALL CUSTOMERS MIDLOTHIAN SYSTEM IMPROVEMENT
666 080.74747 (20,821)
INSTALL 2,214 FEET OF 2 INCH POLY ALONG CORSICANA STREET AND ABANDON 415 FEET
OF STEEL, 708 FEET OF 3 INCH, 1,745 FEET OF 2 INCH STEEL AND 228 FEET OF 4 INCH, 84
FEET OF 3 INCH, 420 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
667 080.74752 2,866
RELOCATE FACILITIES. INSTALL 280 FEET OF 4 INCH AND 405 FEET OF 2 INCH POLY AND
ABANDON 405 FEET OF 2 INCH AND 280 FEET OF 4 INCH STEEL ALONG SHADOW LANE TO
ACCOMODATE CITY OF IRVING STORM DRAIN PROJECT IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING RELOCATION OF FACILITIES
668 080.74753 (200,800)
INSTALL 3,250 FEET OF 2 INCH POLY AND ABANDON 178 FEET OF 6 INCH, 967 FEET OF 4
INCH STEEL, AND 66 FEET OF 4 INCH, 1,014 FEET OF 2 INCH POLY ALONG CORSICANA
STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
669 080.74756 (146,803)
INSTALL DISTRICT REGULATOR STATION #121, 57 FEET OF 2 INCH, 30 FEET OF 4 INCH
POLY ALONG EAST MORPHY STREET AND YUMA AVENUE AND ABANDON 57 FEET OF 4
INCH POLY AND DISTRICT REGULATOR STATION #121 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
670 080.74757 (26,893)
INSTALL 1,310 FEET OF 4 INCH, 526 FEET OF 6 INCH POLY AND ABANDON 1,329 FEET OF 4
INCH STTEL, 488 FEET OF 6 INCH POLY ALONG THE ALLEY OF GOULD AVENUE AND
DENVER AVENUE IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
671 080.74759 (3,474)
INSTALL 2750 FEET OF 2 INCH POLY AND ABANDON 1440 FEET OF 2 INCH, 1200 FEET OF 3
INCH STEEL AND 30 FEET OF 2 INCH POLY ALONG THE STREETS OF DALLAS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
672 080.74762 (3,652)
REPLACE 460 FEET OF 4 INCH POLY ALONG FAROLA DRIVE AND ABANDON 145 FEET OF 3
INCH STEEL.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
673 080.74771 (29)
RELOCATE FACILITIES. INSTALL 570 FEET OF 2 INCH POLY ALONG THE EASEMENT OF
MILLER ROAD AND ABANDON 550 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF
GARLAND STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS GARLAND RELOCATION OF FACILITIES
674 080.74773 (195,493)
INSTALL 16 INCH PIG TRAP AT PLANO SOUTH STATION, INSTALL 500 FEET OF 4 INCH ON
D17-4-10 AND INSTALL TWO (2) REGULATOR STATIONS AT SANDEN STATION IN WYLIE,
COLLIN COUNTY.ALL CUSTOMERS WYLIE SYSTEM IMPROVEMENT
675 080.74775 (40,837)
INSTALL DISTRICT REGULATOR STATION #126, 35 FEET OF 2 INCH AND 35 FEET OF 4 INCH
POLY ALONG EAST ARLINGTON AVENUE AND YUMA AVENUE AND ABANDON DISTRICT
REGULATOR STATION #126 AND 35 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
676 080.74776 (230,974)
INSTALL 40 FEET OF 2 INCH AND 38 FEET OF 4 INCH POLY AND DISTRICT REGULATOR
STATION #136 ALONG WEST DEVITT STREET AND RYAN AVENUE AND ABANDON 40 FEET
OF 3 INCH POLY AND DISTRICT REGULATOR STATION #136 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
677 080.74778 (9,915)
INSTALL 94 POLY SERVICES AND ABANDON 94 STEEL SERVICES IN WACO IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
678 080.74779 (32,847)
RELOCATE FACILITIES. INSTALL 1075 FEET OF 4 INCH POLY ALONG MARBLEHEAD DRIVE
AND ABANDON 1050 FEET OF 6 INCH STEEL ITO ACCOMODATE CITY OF DALLAS N
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
679 080.74780 (27,598)
INSTALL 30 FEET OF 2 INCH AND 40 FEET OF 4 INCH AND DISTRICT REGULATOR STATION
#14 ALONG COTTAGE STREET AND AVENUE D IN BROWNWOOD AND ABANDON 40 FEET
OF 4 INCH AND 5 FEET OF 6 INCH STEEL AND 5 FEET OF 6 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY
680 080.74782 (17,013)
INSTALL 3,205 FEET OF 2 INCH POLY ALONG ROSEMARY AND GARFIELD IN DALLAS AND
ABANDON 3,205 FEET OF 2I NCH STEE AND 50 FEET OF 2 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
681 080.74783 (33,728)
INSTALL 50 FEET OF 2 INCH AND 30 FEET OF 4 INCH POLY AND DISTRICT REGULATOR
STATION #36 AND ABANDON 20 FEET OF 2 INCH AND 30 FEET OF 6 INCH STEEL AT THE
INTERSECTION OF 9TH AVENUE & 10TH AVENUE IN BROWNWOOD IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD SYSTEM INTEGRITY
682 080.74786 (2,814)
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY AND ABANDON 490 FEET OF 2
INCH POLY ALONG RIDGE ROAD WEST TO ACCOMODATE CITY OF ROCKWALL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY
683 080.74794 (24,476)
INSTALL 2,640 FEET OF 2 INCH POLY ALONG GARFIELD ROAD AND PHINNEY IN DALLAS
AND ABANDON 2,560 FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
684 080.74799 (20,941)
INSTALL 2,930 FEET OF 2 INCH POLY ALONG OGDEN AND HIGGINS IN DALLAS AND
ABANDON 2,850 FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
685 080.74807 360
RELOCATE FACILITIES. INSTALL 22 FEET OF 6 INCH POLY ALONG LAKEWOOD DRIVE AND
ABANDON 20 FEET OF 6 INCH POLY TO ACCOMODATE DEVELOPER FACILITIES. ALL CUSTOMERS BURLESON RELOCATION OF FACILITIES
686 080.74808 (185)
INSTALL 215 FEET OF 2 INCH POLY ALONG NORTH MAIN STREET AND ABANDON 215 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS BLUE RIDGE SYSTEM INTEGRITY
687 080.74809 (2,990)
INSTALL 15 FEET OF 2 INCH AND 875 FEET OF 4 INCH POLY ALONG NORTH RIKE STREET
IN FARMERSVILLE AND ABANDON 5 FEET OF 1.25 INCH, 5 FEET OF 2 INCH POLY AND 1,393
FEET OF 4 INCH, 122 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY
688 080.74822 (19,279)
RELOCATE FACILITIES. INSTALL 1.098 FEET OF 6 INCH POLY AND 140 FEET OF 10 INCH
STEEL AND ABANDON 1,078 FEET OF 6 INCH POLY AND 205 FEET OF 8 INCH STEEL ALONG
STATE HIGHWAY 66 AND DALROCK ROAD IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY
689 080.74825 (31,955)
INSTALL 700 FEET OF 4 INCH POLY ALONG SPRINGLAKE PARKWAY AND ABANDON 790
FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY
690 080.74828 (860)
ABANDON DISTRICT REGULATOR STATION #17 AND 3 FEET OF 3 INCH AND 35 FEET OF 2
INCH POLY IN THE CITY OF COLEMAN, COLEMAN COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY
691 080.74830 (2,478)
INSTALL 30 FEET OF 2 INCH AND 30 FEET OF 4 INCH POLY AND DISTRICT REGULATOR
STATION #14 AT FIFTH AVENUE BETWEEN PECAN STREET AND COLLEGE STREET IN
COLEMAN AND ABANDON 33 FEET OF 3 INCH AND 7FEET 4 INCH STEEL, 32 FEET OF 4
INCH POLY AND DISTRICT REGULATOR STATION #14 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE OF 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY
692 080.74831 (2,122)
INSTALL DISTRICT STATION #23 AND 30 FEET OF 2 INCH, 30 FEET OF 4 INCH POLY IN
COLEMAN COUNTY AND ABANDON DISTRICT REGULATOR STATION #23 AND 8 FEET OF 2
INCH POLY AND 12 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY
693 080.74835 (1,117)
INSTALL 20 FEET OF 2 INCH AND&NBSP; DISTIRCT REGULATOR STATION #10 ALONG WEST
VALLEY STREET AND SOUTH AMMERMAN AVENUE IN EASTLAND AND
ABANDON 20 FEET OF 2 INCH STEEL, 5 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR
STATION #10 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND SYSTEM INTEGRITY
MTX Retirements
Page 20 of 45
520
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
694 080.74839 (2,358)
INSTALL 30 FEET OF 2 INCH AND 30 FEET OF 4 INCH POLY AND DISTRICT REGULATOR
STATION #8 ALONG NORTH 2ND STREET AND NORTH SANTA FE STREET IN SANTA ANNA
AND ABANDON 5 FEET OF 2 INCH AND 15 FEET OF 3 INCH POLY AND 10 FEET OF 4 INCH
STEEL AND DISTRICT REGULATOR STATION #08 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANTA ANNA SYSTEM INTEGRITY
695 080.74845 (4,657)
INSTALL 1,300 FEET OF 2 INCH, 1,250 FEET OF 4 INCH POLY ALONG WALBURN COURT AND
ABANDON 2,610 FEET OF 2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD
COMMISSION RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
696 080.74847 (16,527)
INSTALL 2,390 FEET OF 2 INCH POLY ALONG NAVARRO STREET AND ABANDON 1,570 FEET
OF 2 INCH, 730 FEET OF 4 INCH STEEL AND 60 FEET OF 3 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
697 080.74854 (34,423)
INSTALL 1,815 FEET OF 2 INCH POLY ALONG BAYSIDE AND ABANDON 1,805 FEET OF 2
INCH STEEL AND 10 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
698 080.74861 19
RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH POLY AND ABANDON 350 FFET OF 2
INCH POLY ALONG COMMANDER ROAD TO ACCOMMODATE CITY OF FORT WORTH
STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
699 080.74863 12,643
INSTALL 900 FEET OF 2 INCH POLY ALONG STREETS OF GODLEY AND ABANDON 900 FEET
OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS GODLEY SYSTEM INTEGRITY
700 080.74866 (13,224)
INSTALL DISTRICT REGULATOR STATION #04 AND 75 FEET OF 2 INCH AND 30 FEET OF 4
INCH POLY ALONG DUNBAR STREET AND ABANDON 15 FEET OF 4 INCH AND 25 FEET OF 6
INCH STEEL AND DISTRICT REGULATOR STATION # 04 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY
701 080.74867 (7,569)
INSTALL 70 FEET OF 2 INCH, 300 FEET OF 4 INCH POLY AND DISTRICT REGULATOR
STATION #05 ALONG WICHITA STREET AND ABANDON 30 FEET OF 4 INCH POLY 185 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY
702 080.74868 (19,950)
ABANDON DISTRICT REGULATOR STATION DRS01, 534 FEET OF 4 INCH STEEL AND 764
FEET OF 4 INCH POLY ALONG EAST WICHITA STREET IN HENRIETTA, CLAY COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY
703 080.74869 (4,633)
INSTALL DISTRICT REGULATOR STATION DRS08, 40 FEET OF 2 INCH AND 180 FEET OF 4
INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS08 AND 20 FEET OF 2 INCH
AND 45 FEET OF 6 INCH STEEL ALONG S RED RIVER STREET IN HENRIETTA, CLAY COUNTY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY
704 080.74873 (32,121)
INSTALL DISTRICT REGULATOR STATION 026 AND 30 FEET OF 2 INCH, 30 FEET OF 4 INCH
POLY AND ABANDON DISTRICT REGULATOR STATION 026 AND 48 FEET OF 2 INCH, 63
FEET OF 4 INCH STEEL AND 8 FEET OF 4 INCH POLY ALONG 11TH STREET IN WICHITA
FALLS, WICHITA COUNTY.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
705 080.74874 (4,242)
INSTALL DISTRICT REGULATOR STATION #09 ALONG EASTON STREET AND GEORGIA
STREET IN VERNON AND ABANDON DISTRICT REGULATOR STATION #09 IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY
706 080.74875 (12,671)
INSTALL DISTRICT REGULATOR STATION #10 ALONG BEAVER STREET AND MAIN STREET
IN VERNON AND ABANDON DISTRICT REGULATOR STATION #10 IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY
707 080.74877 (21,636)
INSTALL DISTRICT REGULATOR STATION #22, 45 FEET OF 2 INCH, 30 FEET OF 4 INCH POLY
AND ABANDON DISTRICT REGULATOR STATION #22 AND 195 FEET OF 4 INCH POLY, 15
FEET OF4 INCH, AND 15 FEET OF 8 INCH STEEL ALONG BIRDWELL IN ACCORDANCE WITH
RAILROAD COMMISISON OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
708 080.74879 (25,974)
INSTALL DISTRICT REGULATOR STATION #103, 70 FEET OF 2 INCH AND 540 FEET OF 4
INCH POLY AND ABANDON DISTRICT REGULATOR STATION #103 AND 115 FEET OF 2 INCH
POLY AND 15 FEET OF 6 INCH STEEL ALONG MCGRATH IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
709 080.74881 (47,806)
INSTALL 3,950 FEET OF 4 INCH AND 450 FEET OF 2 INCH POLY ALONG CANADA DRIVE
AND ABANDON 3,790 FEET OF 4 INCH, 420 FEET OF 2 INCH STEEL, 40 FEET OF 4 INCH AND
40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209..ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
710 080.74888 (36,513)
INTEGRITY DIGS AND REMEDIATION ALONG LINE D IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
711 080.74889 (50,402)
RELOCATE FACILITIES. INSTALL 1,575 FEET OF 8 INCH POLY ALONG HIGHWAY 290 IN
MANOR AND ABANDON 1,945 FEET OF 8 INCH POLY. ALL CUSTOMERS MANOR RELOCATION OF FACILITIES
712 080.74893 (5,428)
INSTALL 1,540 FEET OF 2 INCH POLY ALONG PUGET STREET AND ABANDON 1,500 FEET
OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
713 080.74898 (109,816)
INSTALL 3,780 FEET OF 4 INCH AND 110 FEET OF 2 INCH POLY AND ABANDON 220 FEET OF
2 INCH. 50 FEET OF 3 INCH, 1,990 FEET OF 6 INCH AND 1,650 FEET OF 8 INCH STEEL, AND
10 FEET OF 2 INCH, 20 FEET OF 4 INCH POLY ALONG HAMPTON IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
714 080.74905 (30,070)
INSTALL 30 FEET OF 4 INCH POLY ALONG THE NORTHWEST CORNER OF COUNTY ROAD
138 AND LITTLE LAKE ROAD AND ABANDON 126 FEET OF 2 INCH POLY ALONG
NORTHWEST CORNER OF CR138 AND DANA DRIVE IN ACCORDANCE WITH THE RAILROAD
COMMISSION TEXAS RULE 8.209. ALL CUSTOMERS HUTTO SYSTEM INTEGRITY
715 080.74906 (10,518)
RELOCATE FACILITIES. INSTALL 1738 FEET OF 4 INCH AND 262 FEET OF 2 INCH POLY AND
ABANDON 1801 FEET OF 3 INCH, 142 FEET OF 2 INCH STEEL AND 173 FEET OF 2 INCH
POLY ALONG BARNETT STREET TO ACCOMODATE CITY OF KERRVILLE STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY
716 080.74909 (10,181)
INSTALL 2,500 FEET OF 2 INCH, 1,375 FEET OF 4 INCH POLY ALONG TITUS STREET AND
ABANDON 375 FEET OF 4 INCH POLY AND 3,500 FEET OF 6 INCH STEEL AND DISTRICT
REGULATOR STATION #28 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209..ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
717 080.74913 (427)
RELOCATE FACILITIES. INSTALL 20 FEET OF 4 INCH POLY ALONG PUTNAM DRIVE AND
ABANDON 6 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY
718 080.74924 (464)
INSTALL 225 FEET OF 2 INCH POLY ALONG AINSWORTH AND ABANDON 245 FEET OF 2
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
719 080.74925 (3,898)
INSTALL 2,792 FEET OF 2 INCH POLY ALONG ERATH STREET AND NORTH 44TH STREET IN
WACO AND ABANDON 2,562 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
720 080.74930 (14,414)
RELOCATE FACILITIES. INSTALL 150 FEET OF 8 INCH AND 150 FEET OF 8 INCH POLY
ALONG NW 22ND STREET AND ABANDON 275 FEET OF 8 INCH AND 75 FEET OF 4 INCH
STEEL TO ACCOMMODATE THE CITY OF FORTH WORTH IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
721 080.74937 1,064
INSTALL 2950 FEET OF 8 INCH POLY ALONG STREETS OF BALCH SPRINGS AND ABANDON
2953 FEET OF 8 INCH STEEL AND 10 FEET OF 6 INCH POLY IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALCH SPRINGS SYSTEM INTEGRITY
722 080.74939 (2,910)
ABANDON 715 FEET OF 2 INCH POLY AND 450 FEET OF 4 INCH STEEL ALONG SCOTT
STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY
723 080.74946 (32) INSTALL 100 FEET OF 4 INCH POLY ALONG EAST MAIN STREET.
COMMERCIAL OR
INDUSTRIAL EASTLAND GROWTH
724 080.74956 (4,543)
RELOCATE FACILITIES. INSTALL 250 FEET OF 6 INCH STEEL AND ABANDON 250 FEET OF 6
INCH STEEL ALONG INTERSECTION OF TEXAS AVE AND FM 2818 TO ACCOMODATE NEW
BUILDING.ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES
725 080.74958 (3,106)
INSTALL 100 FEET OF 8 INCH STEEL ALONG WILLIAMS DRIVE IN GEORGETOWN AND
ABANDON 100 FEET OF 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY
726 080.74979 (7,163)
RELOCATE FACILITIES. INSTALL 150 FEET OF 6 INCH POLY ALONG WESTPORT PARKWAY
AND ABANDON 150 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH. ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
727 080.74980 (849)
INSTALL 450 FEET OF 6 INCH POLY ALONG CHERRY AND ABANDON 450 FEET OF 4 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY
MTX Retirements
Page 21 of 45
521
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
728 080.74981 (24,681)
INSTALL 3,740 FEET OF 2 INCH POLY AND ABANDON 3,295 FEET OF 3 INCH AND 55 FEET
OF 6 INCH STEEL NEAR THE INTERSECTION OF CHANNEL AND BROCKBANK IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
729 080.74983 (7,283)
INSTALL 1,500 FEET OF 2 INCH POLY AND ABANDON 1,500 FEET OF 2 INCH STEEL ALONG
THE STREETS OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
730 080.74984 (32,387)
INSTALL 2,670 FEET OF 2 INCH POLY AND ABANDON 2,240 FEET OF 2 INCH, 165 FEET OF 4
INCH, AND 10 FEET OF 8 INCH STEEL AND 165 FEET OF 4 INCH POLY ALONG WEBBS
CHAPPLE IN ACCORDANCE WITH THE RAILROAD COMMISSON OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
731 080.74985 (4,628)
INSTALL DISTRICT REGULATOR STATION #01 ALVORD STREET AND EAST CURTIS STREET
IN QUANAH AND ABANDON DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH SYSTEM INTEGRITY
732 080.74986 347
RELOCATE FACILITIES. INSTALL 550 FEET OF 4 INCH POLY AND ABANDON 550 FT OF 3 IN
STEEL TO ACCOMODATE CITY OF DALLAS STREETS PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
733 080.74988 (2,703)
RELOCATE FACILITIES. INSTALL 22 .75 INCH POLY SERVICE LINES ALONG ALAMO STREET
BETWEEN GOLIAD STREET AND HEATH STREET IN ROCKWALL AND ABANDON 22 .75 INCH
POLY SERVICE LINES TO ACCOMMODATE THE CITY OF ROCKWALL IMPROVEMENT
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY
734 080.74993 (33,351)
INSTALL 3,990 FEET OF 2 INCH POLY ALONG BELKNOLL AND SEYMOUR IN DALLAS AND
ABANDON 90 FEET OF 2 INCH POLY AND 3,675 FEET OF 3 INCH AND 230 FEET OF 6 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
735 080.74996 (17,520)
INSTALL 2,400 FEET OF 2 INCH POLY AND ABANDON 278 FEET OF 2 INCH, 589 FEET OF 3
INCH STEEL AND 161 FEET OF 2 INCH, 1,355 FEET OF 4 INCH POLY ALONG SUNSET, ANNA
AND BOLIVAR STREET IN ACCORDANCE TO THE TEXAS RAILROAD COMMISSION RULE
8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY
736 080.75025 (4,546)
INSTALL 2,750 FEET OF 2 INCH POLY AND ABANDON 2,700 FEET OF 2 INCH STEEL ALONG
RADSTOCK STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
737 080.75029 1,480
RELOCATE FACILITIES. INSTALL 990 FEET OF 2 INCH POLY ALONG GLENDORA AND
ABANDON 990 FEET OF 2 INCH STEEL TO ACCOMODATE CITY OF DALLAS IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
738 080.75032 (7,398)
INSTALL 2,600 FEET OF 4 INCH ALONG WRIGLEY WAY IN FORT WORTH AND ABANDON
2,500 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
739 080.75041 233
INSTALL 465 FEET OF 4 INCH POLY AND ABANDON 425 FEET OF 4 INCH STEEL ALONG
STREETS OF CLEBURNE.ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY
740 080.75048 (41,957)
INSTALL 1,293 FEET OF 4 INCH, 500 FEET OF 6 INCH POLY ALONG DENVER AVE AND
LAGONDA AVENUE IN FORT WORTH AND ABANDON 1,273 FEET OF 4 INCH , 70 FEET OF 6
INCH STEEL, AND 431 FEET OF 6 INCH AND 219 FEET OF 4 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
741 080.75054 (661)
INSTALL 700 FEET OF 4 INCH POLY ALONG CYPRESS AND ABANDON 700 FEET OF 4 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE SYSTEM INTEGRITY
742 080.75058 (44,838)
INSTALL 3,120 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY ALONG RUSTOWN AND OATS
IN DALLAS AND ABANDON 2,630 FEET OF 8 INCH, 1,365 FEET OF 6 INCH, 275 FEET OF 3
INCH AND 15 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
743 080.75059 (20,049)
INSTALL 2,400 FEET OF 2 INCH POLY AND ABANDON 2,390 FEET OF 3 INCH STEEL ALONG
THE STREETS OF RUSTOWN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
744 080.75066 36
RELOCATE FACILITIES. INSTALL 131 FEET OF 2 INCH POLY ALONG WESTBOROUGH LANE
AND ABANDON 125 FEET OF 2 INCH POLY TO ACCOMODATE DEVELOPER FACILITIES. ALL CUSTOMERS LEANDER RELOCATION OF FACILITIES
745 080.75067 (1,439)
ABANDON 570 FEET OF 3 INCH STEEL ALONG SOUTH OAKES STREET IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY
746 080.75068 (6,136)
INSTALL 1,650 FEET OF 2 INCH POLY ALONG WHITMAN AVENUE IN FORT WORTH AND
ABANDON 1,600 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
747 080.75069 (22,464)
INSTALL 2,025 FEET OF 2 INCH, 315 FEET OF 4 INCH POLY ALONG NORTH LUMPKIN
STREET WITHIN THE CITY OF MART AND ABANDON 10 FEET OF 4 INCH, 15 FEET OF 3 INCH
POLY AND 950 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS MART SYSTEM INTEGRITY
748 080.75071 (8,724)
INSTALL 360 FEET OF 4 INCH, 1,750 FEET OF 2 INCH POLY AND ABANDON 1,370 FEET OF 3
INCH STEEL AND 420 FEET OF 4 INCH POLY ALONG MCLLENAN AVENUE IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY
749 080.75072 (39,399)
INSTALL 2,495 FEET OF 2 INCH AND 700 FEET OF 4 INCH POLY NEAR THE INTERSECTION
OF GROSS AND PIPER AND ABANDON 820 FEET OF 6 INCH AND 3,000 FEET OF 3 INCH
STEEL AND 30 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
750 080.75073 (8,492)
INSTALL 2,127 FEET OF 4 INCH POLY AND ABANDON 2,138 FEET OF 3 INCH, 20 FEET OF 4
INCH POLY ALONG TEXAS AVENUE AND NORTH COUNTY LINE ROAD IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART SYSTEM INTEGRITY
751 080.75074 (19,500)
INSTALL 20 FEET OF 2 INCH AND 3,310 FEET OF 4 INCH POLY NEAR THE INTERSECTION OF
GROSS AND SORRENTO IN DALLAS AND ABANDON 1,295 FEET OF 6 INCH, 1,070 FEET OF 3
INCH, 15 FEET OF 2 INCH, AND 955 FEET OF 1.25 INCH STEEL AND 10 FEET OF 2 INCH
POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
752 080.75077 (68,217)
INSTALL DISTRICT REGULATOR STATION #22 AND 165 FEET OF 4 INCH STEEL ALONG 4TH
STREET AND FORREST AVENUE AND ABANDON DISTRICT REGULATOR STATION #22 AND
160 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY
753 080.75078 (17,887)
INSTALL 10 FEET OF 4 INCH AND 620 FEET OF 6 INCH POLY ALONG GOODWIN AND
ABANDON 600 FEET OF 10 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
754 080.75083 (37,518)
RELOCATE FACILITIES. INSTALL 3,600 FEET OF 2 INCH, 450 FEET OF 4 INCH POLY AND
ABANDON 3,600 FEET OF 2 INCH AND 450 FEET OF 4 INCH POLY ALONG ELMCREST AND
LARRAINE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY
755 080.75084 (290,026)
INSTALL 4 MILES OF 6 INCH STEEL FROM P(2ND)/L26 JUNCTION TO LOTT DISTRICT
REGULATOR STATION SOUTH OF HWY 320 AND ABANDON 4 MILES OF 6 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LOTT SYSTEM INTEGRITY
756 080.75091 (2,587)
INSTALL 2,000 FEET OF 4 INCH, 450 FEET OF 2 INCH POLY ALONG WEST HOPKINGS
STREET AND ABANDON 2,550 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY
757 080.75098 312
RELOCATE FACILITIES. INSTALL 120 FEET OF 4 INCH POLY AND ABANDON 120 FEET OF 4
INCH POLY ALONG KARNES STREET TO ACCOMODATE CITY OF FLOWERMOUND IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND RELOCATION OF FACILITIES
758 080.75112 2,803
INSTALL 275 FEET OF 2 INCH POLY AND ABANDON 358 FEET OF 10 INCH STEEL ALONG
10TH STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
759 080.75115 (2,671)
INSTALL 75 FEET OF 4 INCH POLY ALONG HORNE STREET, 450 FEET OF 2 INCH POLY
ALONG CARVER DRIVE AND ABANDON 450 FEET OF 3 INCH STEEL AND 30 FEET OF 4 INCH
POLY DUE TO CITY CONFLICT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209..ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
760 080.75124 (10,770)
RELOCATE FACILITIES. INSTALL 1,180 FEET OF 2 INCH POLY ALONG CHERRY STREET AND
EAST CENTER STREET IN DUNCANVILLE AND ABANDON 107 FEET OF 1.25 INCH, 507 FEET
OF 2 INCH STEEL AND 450 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY
761 080.75132 (273)
RELOCATE FACILITIES. INSTALL 300 FEET OF 6 INCH POLY ALONG MAIN STREET AND
ABANDON 300 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF CROWLEY STREET
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY RELOCATION OF FACILITIES
MTX Retirements
Page 22 of 45
522
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
762 080.75133 (54,180)
INSTALL 1,121 FEET OF 2 INCH, 930 FEET OF 4 INCH POLY AND ABANDON 280 FEET OF 3
INCH, 890 FEET, 175 FEET OF 6 INCH STEEL AND 615 FEET OF OF 4 INCH, 305 FEET OF 6
INCH POLY ALONG NORTH WACO STREET IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
763 080.75146 (44,840)
INSTALL 3,520 FEET OF 2 INCH POLY ALONG HEALEY DRIVE ALLEY AND ABANDON 1,950
FEET OF 3 INCH, 1,560 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
764 080.75147 (120,192)
INSTALL 2,960 FEET OF 2 INCH POLY AND ABANDON 2,860 FEET OF 3 INCH STEEL, 100
FEET OF 4 INCH POLY ALONG HILLGLENN ROAD IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
765 080.75152 (5,015)
INSTALL 350 FEET OF 2 INCH POLY ALONG KNOLL TRAIL IN DALLAS AND ABANDON 700
FEET OF 2 INCH POLY.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
766 080.75159 (53,593)
INSTALL 3,630 FEET OF 2 INCH POLY ALONG MILMAR DRIVE ALLEY AND ABANDON 3,530
FEET OF 3 INCH STEEL AND 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
767 080.75160 (34,326)
INSTALL 1,350 FEET OF 2 INCH POLY ALONG MARLIN DRIVE ALLEY AND ABANDON 1,350
FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209..ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
768 080.75161 (50,387)
INSTALL 4,260 FEET OF 2 INCH POLY AND ABANDON 3,050 FEET OF 6 INCH, 1,210 FEET OF
3 INCH STEEL ALONG CRET RIDGE DRIVE IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
769 080.75162 (4,099)
INSTALL 200 FEET OF 4 INCH POLY AND ABANDON 130 FEET OF 4 INCH POLY ALONG THE
STREETS OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
770 080.75170 (51,213)
INSTALL DISTRICT REGULATOR STATION #301 AND 5 FEET OF 2 INCH, 5 FEET OF 4 INCH
POLY ALONG THE STREET OF WESTBROOK IN THE CITY OF FORT WORTH AND ABANDON
DISCTRICT REGULATOR STATION #301 AND 5 FEET OF 2 INCH STEEL, 5 FEET OF 4 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
771 080.75171 (24,358)
INSTALL DISTRICT REGULATOR STATION #307 , 5 FEET OF 2INCH POLY, 5 FEET OF 4 INCH
POLY ALONG THE STREET OF MURPHY STREET IN THE CITY OF FORT WORTH AND
ABANDON DISTRICT REGULATOR STATION #307 AND 5 FEET OF 6 INCH, 5 FEET OF 2 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
772 080.75174 (24,631)
INSTALL DISTRICT REGULATOR STATION #403, 5 FEET OF 2 INCH, 5 FEET OF 4 INCH POLY
ALONG PUTNAM STREET AND ABANDON DISTRICT REGULATOR STATION #403, 5 FEET OF
4 INCH, 5 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
773 080.75175 (17,646)
INSTALL DISTRICT REGULATOR STATION #405 AND ABANDON DISTRICT REGULATOR
STATION #405 AT THE INTERSECTION OF CAMILLIA AND PARKDALE IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
774 080.75184 (6,331)
INSTALL 1,575 FEET OF 2 INCH AND 375 FEET OF 4 INCH POLY ALONG WACO WAY IN FORT
WORTH AND ABANDON 1,950 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
775 080.75188 (9,162)
INSTALL 2,500 FEET OF 2 INCH POLY AND ABANDON 2,450 FEET OF 2 INCH STEEL ALONG
MARTIN LUTHER KING SOUTH. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY
776 080.75190 (15,347)
INSTALL 1,100 FEET OF 2 INCH POLY AND ABANDON 850 FEET OF 4 INCH STEEL AND 25
FEET OF 4 INCH POLY ALONG THE ALLEY EAST OF BROOK TP SPEEDWAY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
777 080.75195 (23,823)
INSTALL DISTRICT REGULATOR STATION #138, 28 FEET OF 2 INCH, 30 FEET OF 4 INCH
POLY ALONG THE INTERSECTION OF ALICE STREET AND WEST BIDDISON STREET AND
ABANDON DISTRICT REGULATOR STATION #138 AND 28 FEET OF 6 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
778 080.75196 (44,852)
INSTALL DISTRICT REGULATOR STATION #139 AND 45 FEET OF 2 INCH, 40 FEET OF 4 INCH
POLY ALONG INTERSECTION OF TRAVIS AVENUE AND WEST RIPY STREET AND ABANDON
DISTRICT REGULATOR STATION #139 AND 45 FEET OF 6 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
779 080.75198 (66,817)
INSTALL DISTRICT REGULATOR STATION #140 AND 30 FEET OF 2 INCH, 20 FEET OF 4 INCH
POLY ALONG THE INTERSECTION OF HEMPHILL STREET AND WEST MALTA AND ABANDON
DISTRICT REGULATOR STATION #140 AND 30 FEET OF 12 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
780 080.75199 (46,801)
INSTALL DISTRICT REGULATOR STATION #144 AND 20 FEET OF 2 INCH, 30 FEET OF 4 INCH
POLY AT THE INTERSECTION OF ALL SAINTS AVENUE AND MISTLETOE BOULEVARD AND
ABANDON DISTRICT REGULATOR STATION #144 AND 20 FEET OF 4 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
781 080.75200 (3,254)
INSTALL DISTRICT REGULATOR STATION #02 IN THE ALLEY BETWEEN AVENUE A AND
AVENUE B IN ROSEBUD AND ABANDON DISTRICT REGULATOR STATION #02 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSEBUD SYSTEM INTEGRITY
782 080.75202 (13,385)
ABANDON DISTRICT REGULATOR STATION #03 ALONG EAST MAIN STREET IN ROSEBUD IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSEBUD SYSTEM INTEGRITY
783 080.75203 (72,606)
INSTALL DISTRICT REGULATOR STATION #01, 40 FEET OF 4 INCH POLY AT THE
INTERSECTION OF SOUTH COLLEGE DRIVE AND 2ND STREET AND ABANDON DISTRICT
REGULATOR STATION #01 AND 40 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEENE SYSTEM INTEGRITY
784 080.75210 (37,981)
INSTALL DISTRICT REGULATOR STATION #05 AND 20 FEET OF 2 INCH AND 20 FEET OF 4
INCH STEEL AT THE INTERSECTION OF SPRUCE STREET AND EAST 4TH STREET AND
ABANDON DISTRICT REGULATOR STATION #05 AND 40 FEET OF 2 INCH AND 40 FEET OF 4
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEENE SYSTEM INTEGRITY
785 080.75211 (67,344)
INSTALL DISTRICT REGULATOR STATION #502 AND 5 FEET OF 2 INCH AND 5 FEET OF 4
INCH POLY AT THE INTERSECTION OF CAMP BOWIE BOULEVARD AND CLIFTON STREET
AND ABANDON DISTRICT REGULATOR STATION #502 AND 5 FEET OF 4 INCH STEEL AND 5
FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
786 080.75214 (24,672)
INSTALL DISTRICT REGULATOR STATION #504 AND 5 FEET OF 2 INCH AND 5 FEET OF 4
INCH POLY AT THE INTERSECTION OF HARLEY AVENUE AND HULEN STREET AND
ABANDON DISTRICT REGULATOR STATION #504 AND 5 FEET OF 6 INCH STEEL AND 5 FEET
OF 8 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
787 080.75215 (55,260)
INSTALL DISTRICT REGULATOR STATION #505 AND 5 FEET OF 2 INCH AND 5 FEET OF 4
INCH POLY AT THE INTERSECTION OF EL CAMPO AVENUE AND MERRICK STREET AND
ABANDON DISTRICT REGULATOR STATION #505 AND 5 FEET OF 4 INCH AND 5 FEET OF 8
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
788 080.75216 (31,334)
INSTALL DISTRICT REGULATOR STATION #06 AND 40 FEET OF 4 INCH STEEL AT THE
INTERSECTION OF FM 2280 AND WEST HILLCREST AVENUE AND ABANDON DISTRICT
REGULATOR STATION #06 AND 40 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEENE SYSTEM INTEGRITY
789 080.75219 (30,393)
INSTALL 1,350 FEET OF 2 INCH POLY ALONG THE STREETS OF BRIDWELL AT 23RD STREET
AND ABANDON 1,484 FEET OF 2 INCH STEEL AND 129 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
790 080.75221 3,213
INSTALL DISTRICT REGULATOR STATION #01 AND 20 FEET OF 2 INCH, 20 FEET OF 4 INCH
POLY AT THE INTERSECTION OF ANDERSON STREET AND BELONT STREET AND ABANDON
DISTRICT REGULATOR STATION #01 AND 20 FEET OF 2 INCH AND 20 FEET OF 4 INCH POLY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY
791 080.75227 (79,164)
INSTALL DISTRICT REGULATOR STATION #314 AND 20 FEET OF 2 INCH, 60 FEET OF 4 INCH
POLY AT THE INTERSECTION OF PARRISH RD AND OAK KNOLL DRIVE AND ABANDON
DISTRICT REGULATOR STATION #314 AND 20 FEET OF 2 INCH, 60 FEET OF 4 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY
MTX Retirements
Page 23 of 45
523
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
792 080.75228 (1,000,607)
RELOCATE FACILITIES. INSTALL 1,650 FEET OF 12 INCH AND 140 FEET OF 12 INCH AND
140 FEET OF 2 INCH POLY ALONG TIERNEY ROAD IN FORT WORTH AND ABANDON 1,650
FEET OF 16 INCH STEEL AND 140 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF
FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
793 080.75236 (5,439)
INSTALL DISTRICT REGULATOR STATION #01, 40 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY
AT THE INTERSECTION OF PARK STREET AND COLLEGE STREET AND ABANDON DISTRICT
REGULATOR STATION #01 AND 40 FEET OF 4 INCH, 40 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ITALY SYSTEM INTEGRITY
794 080.75239 (14,611)
INSTALL DISTRICT REGULATOR STATION #509 AND 20 FEET OF 4 INCH, 20 FEET OF 2 INCH
POLY AT THE INTERSECTION OF FARON STREET AND COLLINWOOD AVENUE AND
ABANDON DISTRICT REGULATOR STATION #509 40 FEET OF 4 INCH AND 20 FEET OF 2
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
795 080.75243 (36,787)
INSTALL DISTRICT REGULATOR STATION #521 AND 20 FEET OF 2 INCH, 20 FEET OF 6 INCH
POLY AT THE INTERSECTION OF WILDWOOD DRIVE AND NORTH BAILEY AVENUE AND
ABANDON DISTRICT REGULATOR STATION #521 AND 40 FEET OF 3 INCH AND 40 FEET OF 6
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
796 080.75251 175,960
INSTALL DISTRICT REGULATOR STATION #02 AND 40 FEET OF 2 INCH, 40 FEET OF 4 INCH
POLY ALONG 2ND STREET AND ABANDON DISTRICT REGULATOR STATION #02 AND 40
FEET OF 4 INCH, 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY
797 080.75256 (46,493)
INSTALL DISTRICT REGULATOR STATION #05 AND 40 FEET OF 2 INCH, 40 FEET OF 4 INCH
POLY AT THE INTERSECTION OF WEST 6TH STREET AND ELM STREET AND ABANDON
DISTRICT REGULATOR STATION #05 AND 40 FEET OF 4 INCH AND 40 FEET OF 2 INCH POLY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY
798 080.75259 (61,531)
INSTALL 1,965 FEET OF 4 INCH, 2,300 FEET OF 2 INCH POLY NEAR THE INTERSECTION OF
CREST RIDGE AND SHILOH IN DALLAS AND ABANDON 500 FEET OF 8 INCH, 1,535 FEET OF
4 INCH AND 2,275 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
799 080.75260 (1,130)
INSTALL 150 FEET OF 2 INCH POLY AND ABANDON 150 FEET OF 2 INCH STEEL ALONG
MCCURDY STREET AND ABANDON 150 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY SYSTEM INTEGRITY
800 080.75261 (34,445)
INSTALL 640 FEET OF 4 INCH, 3,695 FEET OF 2 INCH POLY NEAR THE INTERSECTION OF
MATTERHORN AND SAN LUCAS AND ABANDON 2,335 FEET OF 4 INCH, 2025 FEET OF 3
INCH, AND 150 FEET OF 2 INCH STEEL AND 20 FEET OF 3 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
801 080.75263 (4,329)
RELOCATE FACILITIES. INSTALL 755 FEET OF 2 INCH POLY AND ABANDONING 755 FEET
OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
802 080.75276 (43,675)
INSTALL 640 FEET OF 4 INCH AND 2,795 FEET OF 2 INCH POLY ALONG THE ALLEY NORTH
AND SOUTH OF SAN PAULA FROM MATTERHORN TO THE WEST IN DALLAS AND ABANDON
640 FEET OF 8 INCH, 2,795 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
803 080.75278 (11,468)
INSTALL 2,417 FEET OF 2 INCH POLY ALONG ROBINSON AVENUE AND LAMAR STREET AND
321 FEET OF 4 INCH POLY ALONG MYRTA STREET IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY
804 080.75279 (13,478)
INSTALL 2,768 FEET OF 2 INCH POLY ALONG WASHINGTON STREET AND MYRTA STREET
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY
805 080.75280 (22,986)
INSTALL 320 FEET OF 4 INCH AND 2,300 FEET OF 2 INCH POLY NEAR THE INTERSECTION
OF SAN VINCENT AND MATTERHORN IN DALLAS AND ABANDON 1,625 FEET OF 4 INCH, 995
FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
806 080.75281 (17,065)
INSTALL 1,283 FEET OF 4 INCH POLY ALONG EARL GARRETT STREET AND HILLCREST
AVENUE AND 1,342 FEET OF 2 INCH POLY ALONG MYRTA STREET AND ABANDON 1,165
FEET OF 3 INCH, 100 FEET FO 2 INCH STEEL AND 420 FEET OF 3 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY
807 080.75287 (828)
ABANDON 376 FEET OF 2 INCH POLY ALONG CALHOUN STREET IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
808 080.75301 (19,839)
INSTALL 80 FEET OF 2 INCH, 1,580 FEET OF 4 INCH POLY ALONG MCLENNAN AVENUE AND
ABANDON 165 FEET OF 6 INCH, 2,715 FEET OF 4 INCH, 25 FEET OF 3 INCH, AND 30 FEET OF
2 INCH STEEL AND 865 FEET OF 4 INCH, 15 FEET OF 3 INCH, AND 30 FEET OF 2 INCH POLY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS MART SYSTEM INTEGRITY
809 080.75313 (3,317)
INSTALL 1,100 FEET OF 4 INCH POLY AND ABANDON 1,100 FEET OF 2 INCH POLY ALONG
OLD DENTON ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS CARROLLTON SYSTEM IMPROVEMENT
810 080.75314 (4,089)
INSTALL 3,200 FEET OF 4 INCH POLY ALONG WEDGEMONT CIRCLE NORTH IN FORT
WORTH AND ABANDON 600 FEET OF 4 INCH POLY AND 2,600 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
811 080.75315 (7,203)
REPLACE DISTRICT REGULATOR STATION #11 AND 40 FEET OF 2 INCH AND 40 FEET OF 4
INCH POLY ALONG HALL STREET AND ABANDON DISTRICT REGULATOR STATION #11 AND
40 FEET OF 4 INCH, 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY
812 080.75321 (69,392)
INSTALL DISTRICT REGULATOR STATION #01, 40 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY
ALONG COMMERCE STREET AND MAIN STREET AND ABANDON DISTRICT REGULATOR
STATION #01 AND 40 FEET OF 4 INCH, 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MAYPEARL SYSTEM INTEGRITY
813 080.75327 (53,477)
INSTALL 8 INCH MAIN LINE VALVE ASSEMBLY AFTER S20 AND S20-1 IN LANCASTER AND
ABANDON 2 INCH DISTRICT REGULATOR STATION AT S20 TO O1-1. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY
814 080.75328 (1,968)
INSTALL 475 FEET OF 6 INCH POLY ALONG CRAIK STREET AND ABANDON 6 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN SYSTEM INTEGRITY
815 080.75341 (24,153)
INSTALL 720 FEET OF 2 INCH POLY ALONG RUSH STREET AND ABANDON 720 FEET OF 3
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY
816 080.75342 (15,577)
INSTALL 2,030 FEET OF 2 INCH POLY ALONG HADLEY AND BRYAN STREET AND ABANDON
2,421 FEET OF 2 INCH, 171 FEET OF 4 INCH POLY AND 270 FEET OF 2 INCH, 1,708 FEET OF
4 INCH, 14 FEET OF 2 INCH STEEL, IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS ELECTRA SYSTEM INTEGRITY
817 080.75343 (7,509)
INSTALL 630 FEET OF 4 INCH POLY ALONG FERNDALE DRIVE AND ABANDON 630 FEET OF
4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY
818 080.75354 (7,614)
INSTALL 1,400 FEET OF 4 INCH POLY ALONG BRYANT STREET AND ABANDON 1,400 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY
819 080.75356 (16,999)
INSTALL 2,700 FEET OF 4 INCH POLY ALONG LLANO AVENUE AND ABANDON 2,700 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY
820 080.75360 (1,032)
ABANDON 330 FEET OF 2 INCH AND 15 FEET OF 4 INCH POLY ALONG MAIN STREET IN
FRISCO.ALL CUSTOMERS FRISCO SYSTEM INTEGRITY
821 080.75367 (5,293)
INSTALL DISTRICT REGULATOR STATION #15 ALONG THE STREETS OF CISCO AND
ABANDON DISTRICT REGULATOR STATION #15 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY
822 080.75368 (20,510)
INSTALL 202 FEET OF 2 INCH, 1,285 FEET OF 4 INCH, 926 FEET OF 6 INCH POLY ALONG
NORTH CHURCH STREET AND WILLIAMSON STREET AND ABANDON 590 FEET OF 2 INCH
STEEL, 642 FEET OF 2 INCH, 62 FEET OF 3 INCH, 330 FEET OF 4 INCH POLY AND 1,060
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
823 080.75379 (10,775)
INSTALL 1,300 FEET OF 4 INCH, 950 FEET OF 2 INCH POLY ALONG NORTH KOLLMAN ROAD
AND ABANDON 2,150 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY
824 080.75380 (1,263)
INSTALL DISTRICT REGULATOR STATION #05 ALONG WEST DOYLE IN GRANBURY AND
ABANDON DISTRICT REGULATOR STATION #05 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY
MTX Retirements
Page 24 of 45
524
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
825 080.75381 (16,602)
INSTALL DISTRICT REGULATOR STATIONS #06 & #08 AND 60 FEET OF 2 INCH, 90 FEET OF 4
INCH POLY ALONG NORTH BROWN STREET AND SOUTH PRICE STREET IN HAMILTON AND
ABANDON 33 FEET OF 3 INCH, 3 FEET OF 4 INCH STEEL AND 190 FEET OF 4 INCH POLY
AND DISTRICT REGULATOR STATIONS #06 & #08 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HAMILTON SYSTEM INTEGRITY
826 080.75383 (31,191)
INSTALL DISTRICT REGULATOR STATION #03 ALONG WEST FREY STREET IN
STEPHENVILLE AND 30 FEET OF 2 INCH, 70 FEET OF 4 INCH POLY AND ABANDON DISTRICT
REGULATOR STATION #03 AND 36 FEET OF 1.25 INCH, 136 FEET OF 2 INCH, AND 20 FEET
OF 4 INCH POLY AND 595 FEET OF 2 INCH AND 53 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY
827 080.75384 (629)
RELOCATE FACILITIES. INSTALL 240 FEET OF 2 INCH POLY ALONG STACY ROAD AND
ABANDON 230 FEET OF 2 INCH POLY. ALL CUSTOMERS FAIRVIEW RELOCATION OF FACILITIES
828 080.75392 (94,426) INSTALL 32 RECTIFIER RING MAIN UNITS (RMUS) DUE TO 3G SUNSET IN ROUND ROCK. ALL CUSTOMERS ROUND ROCK SYSTEM INTEGRITY
829 080.75398 (43,735)
INSTALL 150 FEET OF 6 INCH AND 1,300 FEET OF 2 INCH POLY ALONG THE STREETS OF
BRITTANY LANE AND ABANDON 150 FEET OF 6 INCH AND 1,258 FEET OF 6 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
830 080.75399 (6,379)
INSTALL TWO (2) DISTRICT REGULATOR STATIONS, 20 FEET OF 2 INCH, 40 FEET OF 4 INCH
POLY. ABANDON DISTRICT REGULATOR STATIONS FARMERSVILLE DRS06 ALONG BOIS D'
ARC AVE AND HILL STREET AND FARMERSVILLE DRS07 AT COLLEGE STREET AND N. RIKE
STREET AND 7 FEET OF 2 INCH, 10 FEET OF 6 INCH POLY AND 47 FEET OF 4 INCH, 2 FEET
OF 6 INCH STEEL IN FARMERSVILLE, COLLIN COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY
831 080.75400 (38,132)
INSTALL 1,700 FEET OF 6 INCH AND 1,200 FEET OF 2 INCH POLY ALONG THE STREETS OF
DAVIS DRIVE AND ST. MARIA COURT IN ARLINGTON AND ABANDON 1,665 FEET OF 6 INCH
AND 1,176 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
832 080.75402 (18,668)
INSTALL 2,400 FEET OF 2 INCH POLY ALONG THE STREET OF ACADEMY DRIVE IN
ARLINGTON AND ABANDON 55 FEET OF 4 INCH, 1,191 FEET OF 2 INCH AND 1,138 FEET OF
1.25 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
833 080.75404 (14,133)
INSTALL 3,350 FEET OF 4 INCH POLY ALONG SUMMIT AVENUE IN ARLINGTON AND
ABANDON 3,165 FEET OF 4 INCH STEEL AND 140 FEET OF 4 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
834 080.75408 (7,247)
INSTALL 2,900 FEET OF 2 INCH POLY AND ABANDON 2,192 FEET OF 2 INCH AND 319 FEET
OF 2 INCH STEEL ALONG SHADY LANE AND W. 4TH ARLINGTON, TARRANT COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
835 080.75409 (19,868)
INSTALL 2,500 FEET OF 2 INCH POLY AND ABANDON 1,671 FEET OF 2 INCH STEEL AND 677
FEET OF 2 INCH POLY ALONG VARSITY CIRCLE IN ARLINGTON, TARRANT COUNTY, IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
836 080.75411 (62,434)
INSTALL 1,710 FEET OF 2 INCH ALONG 9TH AND BEVERLY STREET AND ABANDON 2,332
FEET OF STEEL AND 653 FEET OF POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
837 080.75413 (24,246)
INSTALL 1,745 FEET OF 2 INCH POLY ALONG HAYES AND SEYMOUR ROAD IN WICHITA
FALLS AND ABANDON 14 FEET OF 1.25 INCH AND 171 FEET OF 4 INCH POLY AND 1,747
FEET OF 4 INCH, 130 FEET OF 1.25 INCHAND 58 FEET OF 2INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
838 080.75421 (5,920)
RELOCATE FACILITIES. INSTALL 161 FEET OF 6 INCH POLY AND ABANDON 100 FEET OF 6
INCH POLY ALONG THE STREETS OF NORTHLAKE IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTHLAKE SYSTEM INTEGRITY
839 080.75440 (389)
INSTALL 450 FEET OF 4 INCH POLY ALONG NORTH 12TH AND MULBERRY AND ABANDON
100 FEET OF 4 INCH CAST IRON AND 350 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
840 080.75447 (2,138)
INSTALL MONITOR REGULATOR IN DISTRICT REGULATOR STATION #06 ALONG WOOD
STREET IN GRAPEVINE AND AND ABANDON MONITOR REGULATOR IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY
841 080.75454 (1,494)
INSTALL 240 FEET OF 4 INCH POLY ALONG THE STREETS OF SANGER AND ABANDON 210
FEET OF 4 INCH STEEL AND 45 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER SYSTEM INTEGRITY
842 080.75459 (11,425)
RELOCATE FACILITIES. INSTALL 2,500 FEET OF 4 INCH, 70 FEET OF 2 INCH POLY ALONG
LONG STREET IN STEPHENVILLE AND ABANDON 13 FEET OF 2 INCH, 77 FEET OF 4 INCH,
134 FEET OF 3 INCH POLY, 190 OF 2 INCH, 1,693 FEET OF 4 INCH, 1,515 FEET OF 2 INCH.
416 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF STEPHENVILLE STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY
843 080.75461 (2,152)
RELOCATE FACILITIES. INSTALL 180 FEET OF 4 INCH POLY AND ABANDON 253 FEET OF 2
INCH STEEL ALONG 6TH STREET TO ACCOMMODATE NEW HOTEL. ALL CUSTOMERS WACO RELOCATION OF FACILITIES
844 080.75464 (81,318)
INSTALL DISTRICT REGULATOR STATION #19 AND 70 FEET OF 4 INCH POLY ALONG
BUFFALO STREET AND ABANDON DISTRICT REGULATOR STATION #19 AND 70 FEET OF 4
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY
845 080.75465 (38,138)
INSTALL DISTRICT REGULATOR STATION #20 AND 85 FEET OF 6 INCH ALONG THE
INTERSECTION OF CLAUDE AND MAIN STREET AND ABANDON DISTRICT REGULATOR
STATION #20 AND 85 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY
846 080.75466 (22,524)
INSTALL DISTRCT REGULATOR STATION DRS01 ALONG S. BUTLER DRIVE AND W. MAIN
STREET AND DRS02 ALONG N. BONHAM DRIVE AND W. COATS DRIVE, 22 FEET OF 2 INCH
AND 22 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS01 AND
DRS02 AND 6 FEET OF 2INCH, 9 FEET OF 3 INCH POLY AND 6 FEET OF 4 INCH STEEL IN
ALLEN, COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS ALLEN SYSTEM INTEGRITY
847 080.75473 (6,050)
INSTALL 235 FEET OF 4 INCH POLY AND ABANDON 200 FEET OF 4 INCH POLY ALONG EAST
ELDORADO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY
848 080.75485 (857)
INSTALL DISTRICT REGULATOR STATION #08 AND 40 FEET OF 2 INCH, 40 FEET OF 4 INCH
ALONG WEST AVENUE C AND ABANDON DISTRICT REGULATOR STATION #08 AND 40 FEET
OF 3 INCH, 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY
849 080.75486 (2,083)
INSALL 1,163 FEET OF 2 INCH, 688 FEET OF 4 INCH POLY AND ABANDON 1,740 FEET OF 2
INCH STEEL, 23 FEET OF 2 INCH POLY ALONG MOBERLY STREET IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
850 080.75488 (2,744)
INSTALL 1,400 FEET OF 4 INCH, 1,400 FEET OF 2 INCH POLY ALONG NORTH KOLLMAN
ROAD AND ABANDON 1,950 FEET OF 2 INCH STEEL AND 850 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY
851 080.75489 (2,377)
INSTALL DISTRICT REGULATOR STATION #03 AND 40 FEET OF 2 INCH, 40 FEET OF 4 INCH
POLY ALONG WEST AVENUE H AND ABANDON DISTRICT REGULATOR STATION #03, 40
FEET OF 4 INCH, 20 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY
852 080.75490 (3,810)
INSTALL 1,260 FEET OF 4 INCH, 15 FEET OF 3 INCH, 125 FEET OF 2 INCH POLY ALONG 24TH
STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY
853 080.75493 (40,836)
INSTALL DISTRICT REGULATOR STATION #09 AND 40 FEET OF 2 INCH, 40 FEET OF 4 INCH
POLY ALONG WEST ALABAMA STREET AND ABANDON DISTRICT REGULATOR STATION #09
AND 40 FEET OF 4 INCH, 40 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY
854 080.75507 (12,175)
INSTALL 3,425 FEET OF 2 INCH AND 1,220 FEET OF 4 INCH POLY NEAR THE INTERSECTION
OF LEATH AND HAMMERLY IN DALLAS AND ABANDON 825 FEET OF 3 INCH POLY AND 3,820
FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
855 080.75520 (14,202)
INSTALL 250 FEET OF 2 INCH POLY ALONG 2ND STREET AND ABANDON 300 FEET OF 4
INCH, 750 FEET OF 3 INCH STEEL, 15 FEET OF 4 INCH BARE STEEL, 490 FEET OF 3 INCH,
350 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS CELESTE SYSTEM INTEGRITY
856 080.75541 (3,528)
INSTALL 900 FEET OF 4 INCH, 350 FEET OF 2 INCH POLY AND ABANDON 30 FEET OF 6
INCH, 880 FEET OF 4 INCH, 550 FEET OF 2 INCH STEEL ALONG JOHNSON STREET. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY
MTX Retirements
Page 25 of 45
525
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
857 080.75547 (4,792)
INSTALL 100 FEET OF 2 INCH, 2,550 FEET OF 4 INCH POLY ALONG WEDGEMONT CIRCLE
SOUTH IN FORT WORTH AND ABANDON 2,600 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
858 080.75556 (88,107)
INSTALL DISTRICT REGULATOR STATION #29 AT THE INTERSECTION OF PHILLIPS AND
MADDISON AND ABANDON DISTRICT REGULATOR STATION #29 IN ACCORDANCE WITH
RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY
859 080.75558 (123,058)
INSTALL DISTRICT REGULATOR STATION #31 AT THE INTERSECTION OF BORDER AND
BRYAN IN CLEBURNE AND ABANDON DISTRICT REGULATOR STATION #31 IN
ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY
860 080.75560 (39,682)
INSTALL 2,190 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY ALONG THE INTERSECTION
OF DEERWOOD AND RACINE AND ABANDON 2,190 FEET OF 3 INCH, 395 FEET OF 4 INCH
STEEL AND 10 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
861 080.75561 (548)
RELOCATE FACILITIES. INSTALL 615 FEET OF 2 INCH POLY ALONG BUSINESS 287 AND I-44
ACCESS ROAD AND ABANDON 615 FEET OF 2 INCH STEEL TO ACCOMODATE TXDOT
STREET IMPROVEMENT PROJECT. ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES
862 080.75562 (51,826)
INSTALL DISTRICT REGULATOR STATION #10 AT INTERSECTION OF WEST WILSON STREET
AND NORTH FIELD STREET IN CLEBURNE AND ABANDON DISTRICT REGULATOR STATION
#10 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY
863 080.75563 (70,897)
INSTALL DISTRICT REGULATOR STATION #07 AT THE INTERSECTION OF WEST WILSON
STREET AND NORTH BUFFALO STREET IN CLEBURNE AND ABANDON DISTRICT
REGULATOR STATION #07 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY
864 080.75565 (39,282)
INSTALL DISTRICT REGULATOR STATION #04 AT THE INTERSECTION OF EAST
HENDERSON AND NORTH LEWIS AND ABANDON DISTRICT REGULATOR STATION #04 IN
ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY
865 080.75567 (32,501)
REPLACE 191 SERVICE LINES IN DUNCANVILLE IN ACCORDANCE WITH RAILROAD
COMMISSION RULE 8.209.ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY
866 080.75571 (4,748)
ABANDON 1,335 FEET OF 3 INCH AND 300 FEET OF 2 INCH POLY ALONG FM 1777 IN
JOSEPHINE.ALL CUSTOMERS JOSEPHINE SYSTEM INTEGRITY
867 080.75574 (53,283)
INSTALL 60 FEET OF 12 INCH POLY ALONG BANK STREET AND ABANDON 60 FEET OF 12
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
868 080.75575 (31,967)
INSTALL 68 FEET IN 2 INCH, 984 FEET OF 4 INCH, 1,007 FEET OF 6 INCH POLY AND
ABANDON 902 FEET OF 4 INCH STEEL, 1,375 FEET OF STEEL, 294 FEET OF 4 INCH POLY
ALONG SMITH STREET AND NORTH ABBOTT STREET IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
869 080.75578 (10,573)
INSTALL 2,160 FEET OF 4 INCH AND 470 FEET OF 2 INCH POLY NEAR THE INTERSECTION
OF EMBERWOOD AND RACINE IN DALLAS AND ABANDON 2,160 FEET OF 3 INCH, 470 FEET
OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
870 080.75584 (2,003)
INSTALL 1,950 FEET OF 2 INCH POLY FOR THE BROWNWOOD REGIONAL AIRPORT AND
ABANDON 75 FEET OF 2 INCH POLY AND 2,002 FEET OF 2 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNINCORPORATED SYSTEM INTEGRITY
871 080.75587 (473)
INSTALL 471 FEET OF 4 INCH POLY ALONG DELAWARE SPRING BOULEVARD AND
ABANDON 64 FEET OF 4 INCH POLY AND MAIN LINE REGULATOR #03. ALL CUSTOMERS BURNET RELOCATION OF FACILITIES
872 080.75598 (260,319)
INSTALL 1,529 FEET OF 6 INCH, 659 FEET OF 2 INCH, 539 FEET OF 4 INCH POLY ALONG
THE ALLEY OF HARRINGTON AVENUE AND LAGONDA AVENUE FROM NW 15TH STREET TO
WEST CENTRAL AVE IN FORT WORTH AND ABANDON 1,064 FEET OF 6 INCH, 770 FEET OF
4 INCH POLY, 252 FEET OF 2 INCH, 216 FEET OF 6 INCH IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
873 080.75601 (17,818)
INSTALL RELIEF VALVE IN MORAN AND ABANDON RELIEF VALVE AT MEASURING STATION
6567.2 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MORAN SYSTEM INTEGRITY
874 080.75605 (86,260)
REPLACE 234 SERVICE LINES ALONG THE STREETS OF LAMPASAS IN ACCORDANCE WITH
RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS LAMPASAS SYSTEM INTEGRITY
875 080.75606 (5,045)
INSTALL 740 FEET OF 2 INCH POLY ALONG SHELTON STREET AND ABANDON 626 FEET OF
2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
876 080.75608 (17,078)
INSTALL 3,600 FEET OF 2 INCH POLY ALONG COLLEGE STREET IN SULPHUR SPRINGS AND
ABANDON 3,650 FEET OF 4 INCH STEEL AND 995 FEET 4 INCH, 230 FEET OF 2 INCH POLY
IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY
877 080.75618 (59,263)
INSTALL 1,540 FEET OF 2 INCH, 2,490 FEET OF 4 INCH AND 235 FEET OF 6 INCH POLY
NEAR THE INTERSECTION OF MERRELL AND CARRIZO IN DALLAS AND ABANDON 2,500
FEET OF 4 INCH, 1,260 FEET OF 3 INCH AND 410 FEET OF 6 INCH STEEL AND 10 FEET OF 4
INCH AND 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
878 080.75623 (276)
ABANDON 311 FEET OF 2 INCH STEEL ALONG FRITZ SWANSON ROAD IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KILGORE SYSTEM INTEGRITY
879 080.75624 (3,680)
INSTALL 2,900 FEET OF 2 INCH POLY AND ABANDON 2,800 FEET OF 2 INCH POLY ALONG
WALES COURT IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
880 080.75625 (59,759)
INSTALL 840 FEET OF 4 INCH, 1,895 FEET OF 2 INCH POLY NEAR THE INTERSECTION OF
SAN VICENTE AND SHILOH IN DALLAS AND ABANDON 810 FEET OF 8 INCH, 30 FEET OF 4
INCH AND 1,895 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
881 080.75628 (2,893)
INSATLL 1,645 FEET OF 4 INCH POLY AND ABANDON 1,665 FEET OF 2 INCH STEEL ALONG
FLAMINGO ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
882 080.75642 (286)
INSTALL 2,090 FEET OF 4 INCH POLY ALONG LAGONDA AVENUE IN FORT WORTH AND
ABANDON 2,089 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
883 080.75647 (85,843)
INSTALL 430 FEET OF 8 INCH AND 2,200 FEET OF 12 INCH POLY ALONG WALNUT HILL AND
MIDWAY IN DALLAS AND ABANDON 70 FEET OF 8 INCH POLY AND 475 FEET OF 8 INCH,
2,200 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
884 080.75648 (21,177)
INSTALL 3,185 FEET OF 2 INCH AND 1,360 FEET OF 4 INCH POLY ALONG THE
INTERSECTION OF ABILENE AND LEATH AND ABANDON 535 FEET OF 6 INCH, 2,510 FEET
OF 3 INCH STEEL, 10 FEET OF 6 INCH AND 680 FEET OF 2 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
885 080.75649 (1,514)
INSTALL 130 FEET OF 4 INCH AND 372 FEET OF 2 INCH POLY ALONG NORTH NEATHERY
AND ELM STREETS AND ABANDON 120 FEET OF 3 INCH AND 370 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH THE RAILROADF COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLINSVILLE SYSTEM INTEGRITY
886 080.75650 (37,563)
INSTALL 4,215 FEET OF 4 INCH POLY ALONG ODESSA AND LEATH AND ABANDON 480 FEET
OF 6 INCH,
3,465 FEET OF 3 INCH AND 10 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
887 080.75651 (29,653)
INSTALL 3,370 FEET OF 2 INCH AND 300 FEET OF 4 INCH POLY NEAR THE INTERSECTION
OF PALACIOS AND LEATH IN DALLAS AND ABANDON 200 FEET OF 6 INCH, 3,455 FEET OF 3
INCH, 275 FEET OF 2 INCH STEEL, 10 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
888 080.75653 (21,962)
INSTALL 1,280 FEET OF 4 INCH POLY ALONG TEXAS STREET AND INSTALL 2,750 FEET OF 2
INCH POLY ALONG JARBO, BEASLEY AND BRINKER STREETS IN SULPHUR SPRINGS AND
ABANDON 1,400 FEET OF 4 INCH POLY AND 2,130 FEET OF 4 INCH AND 750 FEET OF 3 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY
889 080.75656 (3,283)
INSTALL 2,054 FEET OF 4 INCH POLY ALONG FLAMINGO ROAD FROM BROOKLINE AVENUE
TO OAK HILL STREET IN FORT WORTH AND ABANDON 2,012 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
890 080.75657 (338)
INSTALL 360 FEET OF 6 INCH POLY AND ABANDON 435 FEET OF 6 INCH STEEL ALONG
TRAIL LAKE DRIVE.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
891 080.75658 (41,740)
INSTALL 1,850 FEET OF 6 INCH POLY ALONG HAINES STREET AND ABANDON 1,850 FEET
OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
MTX Retirements
Page 26 of 45
526
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
892 080.75660 (226)
RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 200 FEET OF 2
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY
893 080.75682 (2,192)
DART METER REPLACEMENT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
894 080.75698 (52,646)
INSTALL 2,620 FEET OF 4 INCH AND 160 FEET OF 2 INCH POLY AND ABANDON 515 FEET OF
6 INCH, 300 FEET OF 4 INCH, 1,045 FEET OF 3 INCH, 580 FEET OF 2 INCH, 30 FEET OF 1.5
INCH STEEL AND 25 FEET OF 4 INCH, 985 FEET OF 2 INCH POLY ALONG WHITE
SETTLEMENT DUE TO CITY CONFLICT IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
895 080.75702 (999)
RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY ALONG FM 1417 AND
ABANDON 250 FEET OF 4 INCH POLY TO ACCOMODATE TXDOT HWY IMPROVEMENTS. ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES
896 080.75705 (51,687)
INSTALL 406 FEET OF 2 INCH, 240 FEET OF 4 INCH POLY ALONG SOUTH CHURCH AND
NEW STREET AND ABANDON 2,667 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
897 080.75706 (260)
INSTALL 348 FEET OF 4 INCH POLY ALONG MADDOX AVENUE AND ABANDON 348 FEET OF
4 INCH STEEL.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
898 080.75712 (37,586)
INSTALL 95 FEET OF 2 INCH, 720 FEET OF 4 INCH, 1,320 FEET OF 6 INCH POLY ALONG S.
ABBOTT STREEET AND EAST WALNUT STREET AND ABANDON 1,800 FEET OF 4 INCH
STEEL AND 1,105 FEET OF 4 INCH, 40 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
899 080.75716 (2,056)
INSTALL DISTRICT REGULATOR STATION #01 AND 80 FEET OF 2 INCH, 40 FEET OF 4 INCH
POLY ALONG NORTH 13TH STREET AND ABANDON DISTRICT REGULATOR STATION #01
AND 5 FEET OF 4 INCH AND 5 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAIL
ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY
900 080.75717 (3,064)
INSTALL DISTRICT REGULATOR STATION #04 AND 40 FEET OF 4 INCH, 40 FEET OF 2 INCH
POLY ALONG WEST REDBUD LANE AND ABANDON DISTRICT REGULATOR STATION #04
AND 40 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY
901 080.75720 (546)
INSTALL 190 FEET OF 2 INCH POLY ALONG WILLIAM STREET AND ABANDON 190 FEET OF 6
INCH STEEL AND 10 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAIL ROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY
902 080.75722 (661)
INSTALL 700 FEET OF 4 INCH POLY ALONG KENDOLPH DRIVE AND ABANDON 60 FEET OF 2
INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY
903 080.75723 (2,822)
INSTALL 1,808 FEET OF 4 INCH POLY ALONG NELL STREET AND ABANDON 1,820 FEET OF 2
INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
904 080.75728 (6,258)
INSTALL 1,416 FEET OF 4 INCH POLY ALONG EASTOVER STREET AND ABANDON 849 FEET
OF 3 INCH POLY AND 580 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
905 080.75729 (20,669)
INSTALL 1,120 FEET OF 4 INCH AND 1,800 FEET OF 2 INCH POLY AND DISTRICT
REGULATOR STATION #04 ALONG SOUTH 4TH STREET AND WALTER STEPHENSON ROAD
IN MIDLOTHIAN AND ABANDON DISTRICT REGULATOR STATION #04 AND 140 FEET OF 3
INCH, 310 FEET OF 4 INCH, 1,060 FEET OF 2 INCH POLY, AND 390 FEET OF 3 INCH, 220
FEET OF 2 INCH, 615 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN SYSTEM INTEGRITY
906 080.75730 (97,811)
INSTALL 1,450 FEET OF 2 INCH AND 480 FEET OF 4 INCH POLY ALONG NORTH WARD
STREET AND SAN JACINTO STREET AND ABANDON 470 FEET OF 2 INCH, 100 FEET OF 4
INCH POLY, AND 340 FEET FEET OF 3 INCH, AND 840 FEET OF 4 INCH STEEL AND DISTRICT
REGULATOR STATION #02 IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS ITALY SYSTEM INTEGRITY
907 080.75731 (16,509)
INSTALL 1,180 FEET OF 2 INCH POLY ALONG TAYLOR, WHITE, MAIN AND COUCH STREET
AND ABANDON 115 FEET OF 2 INCH POLY, 650 FEET OF 2 INCH, 260 FEET OF 4 INCH STEEL
AND DISTRICT REGULATOR STATION #05 IN ACCORDANCE WITH THE RAIL ROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ITALY SYSTEM INTEGRITY
908 080.75736 (8,555)
INSTALL 1,938 FEET OF 2 INCH POLY ALONG HILLSIDE STREET AND SOUTH HUGHES
STREET AND ABANDON 1,954 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAIL
ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
909 080.75742 (1,871)
INSTALL 460 FEET OF 4 INCH POLY ALONG CHILDERS AVENUE AND ABANDON 440 FEET
OF 4 INCH STEEL AND 50 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAIL ROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY
910 080.75750 (5,573)
INSTALL DISTRICT REGULATOR STATION #21 AND 30 FEET OF 2 INCH AND 30 FEET OF 4
INCH POLY ALONG PECOS STREET IN COLEMAN AND ABANDON 150 FEET OF 3 INCH POLY
AND 5 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION #21 IN ACCORDANCE
WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY
911 080.75752 (7,803)
INSTALL 1,006 FEET OF 2 INCH, 645 FEET OF 4 INCH POLY ALONG TAHOE DRIVE AND
ABANDON 1,629 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
912 080.75753 (11,211)
INSTALL 2,900 FEET OF 8 INCH AND 125 FEET OF 2 INCH POLY ALONG DALLAS STREET
BETWEEN WACO AND VAN ALSTYNE PARKWAY IN VAN ALSTYNE AND ABANDON 2,458
FEET OF 3 INCH, 640 FEET OF 2 INCH STEEL AND 191 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY
913 080.75754 (13,910)
INSTALL 2,245 FEET OF 8 INCH, 375 FEET OF 2 INCH AND 200 FEET OF 4 INCH POLY AND
ABANDON 70 FEET OF 4 INCH, 607 FEET OF 3 INCH, 144 FEET OF 2 INCH POLY AND 1,150
FEET OF 3 INCH, 638 FEET OF 2 INCH STEEL ALONG DALLAS AND JEFFERSON STREETS IN
VAN ALSTYNE, GRAYSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS VAN ALSTYNE SYSTEM INTEGRITY
914 080.75758 (7,873)
INSTALL 2,450 FEET OF 2 INCH POLY ALONG MAGNOLIA AND HICKORY AND ABANDON
2,235 FEET OF 2 INCH STEEL AND 215 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY
915 080.75769 (4,110)
INSTALL 1,285 FEET OF 4 INCH POLY ALONG PECOS STREET FROM EASTOVER AVENUE
TO PARKER HENDERSON IN FORT WORTH AND ABANDON 1,273 FEET OF 3 INCH POLY IN
ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
916 080.75770 (4,705)
INSTALL 1,458 OF 2 INCH POLY AND ABANDON 589 FEET OF 2 INCH STEEL AND 24 FEET OF
2 INCH POLY ALONG GLENWOOD LANE IN ACCORDANCE WITH THE RAIL ROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY
917 080.75777 (5,585)
INSTALL 2,325 FEET OF 2 INCH POLY ALONG OAK AND PINE AND ABANDON 2,325 FEET OF
2 INCH STEEL IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY
918 080.75780 (241,721)
INSTALL 70 FEET OF 2 INCH, 3.052 FEET OF 6 INCH, 5 FEET OF 4 INCH POLY ALONG IVY
STREET AND SMITH STREET IN HILLSBORO AND ABANDON 3,212 FEET OF 4 INCH STEEL,
112 FEET OF 3 INCH, 806 FEET OF 4 INCH, AND 1,486 FEET OF 6 INCH POLY IN
ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
919 080.75782 (7,331)
INSTALL 286 FEET OF 2 INCH POLY AND ABANDON 286 FEET OF 2 INCH POLY ALONG
WELLINGTON IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
920 080.75784 (677)
INSTALL DISTRICT REGULATOR STATION #19 AND ABANDON DISTRICT REGULATOR
STATION #19 ALONG LILLIAN STREET BETWEEN LONG AND MCNEIL STREET IN
STEPHENVILLE IN ACCORDANCE WITH THE RAIL ROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY
921 080.75786 (20,842)
INSTALL 772 FEET OF 4 INCH, 595 FEET OF 2 INCH, 590 FEET OF 6 INCH POLY ALONG
HARRINGTON AVENUE AND HOMAN AVENUE IN FORT WORTH AND ABANDON 2,114 FEET
OF POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
922 080.75788 (5,854)
INSTALL 1,450 FEET OF 4 INCH, 404 FEET OF 2 INCH POLY ALONG HOMAN AVENUE FROM
NORTHWEST 15TH STREET TO NORTHWEST 14TH STREET IN FORT WORTH AND
ABANDON 880 FEET OF 3 INCH STEEL AND 934 FEET OF POLY IN ACCORDANCE WITH
TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
923 080.75795 (438)
ABANDON 472 FEET OF 2 INCH STEEL ALONG PEAVINE RAOD AND PRIVATE ROAD 3531 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KILGORE SYSTEM INTEGRITY
924 080.75797 (9,477)
RELOCATE FACILITIES. INSTALL 277 FEET OF 6 INCH POLY ALONG COUNTY ROAD 199
AND CROSS CREEK BOULEVARD ALL CUSTOMERS HUTTO RELOCATION OF FACILITIES
MTX Retirements
Page 27 of 45
527
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
925 080.75799 (3,722)
INSTALL 2,100 FEET OF 4 INCH, 1,000 FEET OF 2 INCH POLY ON SH 14 AND COLLEGE
STREET IN MEXIA AND ABANDON 2,745 FEET OF 2 INCH STEEL AND 382 FEET OF 2 INCH
POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA SYSTEM INTEGRITY
926 080.75806 (118,863)
INTALL 582 FEET OF 4 INCH, 735 FEET OF 6 INCH POLY ALONG THE ALLEY OF HOMAN
AVENUE AND HARRINGTON AVENUE IN FORT WORTH AND ABANDON 640 FEET OF 8 INCH,
584 FEET OF 4 INCH, 94 FEET OF 6 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD
COMISSION RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
927 080.75807 (14,123)
INSTALL 1,200 FEET OF 2 INCH POLY ALONG MILDRED LANE AND ABANDON 1,200 FEET OF
2 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK SYSTEM INTEGRITY
928 080.75808 (387)
INSTALL 60 FEET OF 4 INCH POLY ALONG ESTERS AND CONFLANS ROAD AND ABANDON
60 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS IRVING SYSTEM INTEGRITY
929 080.75815 (583) INSTALL 70 FEET OF 4 INCH POLY ALONG BONNIE VIEW ROAD. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
930 080.75818 (7,017)
INSTALL 925 FEET OF 8 INCH POLY ALONG INTERSTATE 30 AND ABANDON 860 FEET OF 8
INCH POLY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FATE RELOCATION OF FACILITIES
931 080.75821 (1,780)
INSTALL 770 FEET OF 4 INCH POLY ALONG EAST KELLIS AND ABANDON 445 FEET OF 3
INCH STEEL AND 318 FEET OF 4 INCH POLY IN ACCORDANCE WTIH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
932 080.75825 (11,701)
ABANDON 30 FEET&NBSP; OF 4 INCH, 10 FEET OF 6 INCH STEEL IN CITY OF STAMFORD
DISTRICT REGULATOR STATIONS #04 AND #22 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY
933 080.75827 (218)
INSTALL 40 FEET OF 2 INCH AND 40 FEET OF 4 INCH POLY AND DISTRICT REGULATOR
STATION #03 ALONG 8TH STREET AND ROBINSON STREET AND ABANDON 10 FEET OF 2
INCH POLY AND 10 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILES SYSTEM INTEGRITY
934 080.75828 (20,642)
INSTALL 260 FEET OF 4 INCH POLY, SWEETWATER DISTRICT REGULATOR STATIONS #03,
#06, AND #15 AND ABANDON 50 FEET OF 4 INCH, 65 FEET OF 6 INCH, 10 FEET OF 4 INCH
STEEL AND 10 FEET OF 4 INCH POLY AND SWEETWATER DISTRICT REGULATOR STATIONS
#03, #06, AND #15 IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS SWEETWATER SYSTEM INTEGRITY
935 080.75830 (1,182)
INSTALL 80 FEET OF 2 INCH POLY AND LORAINE DISTRICT REGULATOR STATION DRS02
AND ABANDON LORAINE DISTRICT REGLATOR STATION DRS02 AND 10 FEET OF 2 INCH
AND 10 FEET OF 3 INCH STEEL ALONG THE STREETS OF LORAINE, MITCHELL COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LORAINE SYSTEM INTEGRITY
936 080.75845 (58,892)
ABANDON 365 FEET OF 4 INCH, 685 FEET OF 6 INCH, 100 FEET OF 6 INCH STEEL AND
DISTRICT REGULATOR STATION #03 IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY
937 080.75847 (257)
INSTALL 120 FEET OF 4 INCH POLY ALONG HIGHWAY 66 AND ABANDON 100 FEET OF 4
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
938 080.75854 (9,452)
INSTALL 2,297 FEET OF 8 INCH AND 250 FEET OF 2 INCH POLY ALONG BOBTOWN ROAD
AND ABANDON 2,287 FEET OF 6 INCH AND 187 FEET OF 2 INCH STEEL INSTALL 120 FEET
OF 4 INCH POLY ALONG HIGHWAY 66 AND ABANDON 100 FEET OF 4 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
939 080.75858 (11,281)
INSTALL 280 FEET OF 8 INCH POLY ALONG VINEYARD ROAD AND ABANDON 280 FEET OF 8
INCH STEEL INSTALL 120 FEET OF 4 INCH POLY ALONG HIGHWAY 66 AND ABANDON 100
FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY
940 080.75860 (37,290)
INSTALL 533 FEET OF 6 INCH, 416 FEET OF 4 INCH IN THE ALLEY OF HOMAN AVENUE AND
HARRINGTON AVENUE IN FORT WORTH AND ABANDON 701 FEET OF 6 INCH AND 416 FEET
OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
941 080.75863 (48,749)
INSTALL 1,400 FEET OF 4 INCH AND 350 FEET OF 2 INCH POLY ALONG PIONEER DRIVE
AND ABANDON 1,100 FEET OF 4 INCH, 100 FEET OF 4 INCH AND 100 FEET OF 2 INCH POLY
INSTALL 120 FEET OF 4 INCH POLY ALONG HIGHWAY 66 AND ABANDON 100 FEET OF 4
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY
942 080.75867 (585)
INSTALL 185 FEET OF 2 INCH POLY ALONG EAST SOUTH STREET AND ABANDON 110 FEET
OF 4 INCH STEEL, 175 FEET OF 3 INCH AND 14 FEET OF 4 INCH POLY INSTALL 120 FEET OF
4 INCH POLY ALONG HIGHWAY 66 AND ABANDON 100 FEET OF 4 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA SYSTEM INTEGRITY
943 080.75870 (675)
INSTALL 290 FEET OF 2 INCH POLY ALONG TRIPP ROAD AND ABANDON 280 FEET OF 2
INCH STEEL INSTALL 120 FEET OF 4 INCH POLY ALONG HIGHWAY 66 AND ABANDON 100
FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS SUNNYVALE SYSTEM INTEGRITY
944 080.75883 (480)
INSTALL 140 FEET OF POLY AND DISTRICT REGULATOR STATION #01 ALONG MOSS
STREET IN EASTLAND AND ABANDON 225 FEET OF 3 INCH, 142 FEET OF 4 INCH STEEL
AND DISTRICT REGULATOR STATION #01 INSTALL 120 FEET OF 4 INCH POLY AND
ABANDON 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS DE LEON SYSTEM INTEGRITY
945 080.75894 (1,197)
INSTALL 140 FEET OF 8 INCH POLY ALONG MEMORIAL PARKWAY AND ABANDON 130 FEET
OF 8 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS FATE SYSTEM INTEGRITY
946 080.75907 (1,060)
INSTALL 400 FEET OF 4 INCH POLY ALONG NORTH RACE STREET AND ABANDON 480 FEET
OF 4 INCH, 100 FEET OF 4 INCH STEEL, 158 FEET OF 2 INCH POLY INSTALL 120 FEET OF 4
INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209 ALL CUSTOMERS EVERMAN SYSTEM INTEGRITY
947 080.75908 (2) INSTALL 375 FEET OF 2 INCH POLY ALONG SHADY GROVE ROAD. ALL CUSTOMERS IRVING SYSTEM INTEGRITY
948 080.75911 (2,523)
RELOCATE FACILITIES. INSTALL 680 FEET OF 4 INCH POLY ALONG KNOWLES DRIVE AND
ABANDON 300 FEET OF 4 INCH AND 2,195 FEET OF 2 INCH POLY TO ACCOMODATE THE
CITY OF SAGINAW IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209 ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY
949 080.75919 (114,734)
INSTALL 2,246 FEET OF 6 INCH, 145 FEET OF 4 INCH, 1,330 FEET OF 2 INCH POLY AND
ABANDON 920 FEET OF 6 INCH, 190 FEET OF 4 INCH AND 820 FEET OF 2 INCH STEEL
ALONG SANGER AVENUE FROM LAKE AIR DRIVE TO WESTVIEW DRIVE IN WACO,
MCCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY
950 080.75921 (790)
INSTALL 75 FEET OF 2 INCH POLY ALONG OLD DENTON ROAD AND ABANDON 50 FEET OF
2 INCH POLY.ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY
951 080.75922 (1,098)
INSTALL 435 FEET OF 4 INCH POLY ALONG ELM STREET AND ABANDON 300 FEET OF 4
INCH, 115 FEET OF 2 INCH AND 40 FEET OF 1.25 INCH STEEL AND 30 FEET OF 3 INCH POLY
IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209 ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY
952 080.75924 (3,872)
INSTALL DISTRICT REGULATOR STATION #01 AND 90 FEET OF 4 INCH AND 90 FEET OF 2
INCH POLY ALONG TEXAS LAKES TRAIL AND GRACE STREET IN GLEN ROSE AND
ABANDON 90 FEET OF 4 INCH AND 90 FEET OF 3 INCH STEEL AND DISTRICT REGULATOR
STATION #01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLEN ROSE SYSTEM INTEGRITY
953 080.75925 (11,068)
INSTALL 200 FEET OF 4 INCH AND 30 FEET OF 2 INCH POLY AND DISTRICT REGULATOR
#02 ALONG WEST PIERSON STREET AND SOUTH COLLEGE STREET IN HAMILTON AND
ABANDON 210 FEET OF 4 INCH, 11 FEET OF 6 INCH AND 30 FEET OF 4 INCH STEEL AND
DISTRICT REGULATOR STATION #02 AND #03 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HAMILTON SYSTEM INTEGRITY
954 080.75954 (558)
INSTALL 100 FEET OF 4 INCH ALONG BELMEADE DRIVE AND GOLDEN BEAR DRIVE AND
ABANDON 100 FEET OF 4 INCH POLY. ALL CUSTOMERS CARROLLTON RELOCATION OF FACILITIES
955 080.75966 (36,917)
RELOCATE FACILITIES.
INSTALL 1,755 FEET OF 4 INCH POLY AND ABANDON 1,755 FEET OF 6 INCH STEEL IN
ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
956 080.75967 (73,928)
RELOCATE FACILITIES.
INSTALL 1,000 FEET OF 4 INCH AND 800 FEET OF 2 INCH POLY ALONG MILLET AVENUE
AND ABANDON 1,725 FEET OF 4 INCH AND 200 FEET OF 6 INCH POLY IN ACCORDANCE
WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
MTX Retirements
Page 28 of 45
528
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
957 080.75968 (114,046)
INSTALL 3,100 FEET OF 8 INCH, 425 FEET OF 4 INCH, 255 FEET OF 2 INCH POLY AND
ABANDON 3,000 FEET OF 6 INCH, 150 FEET OF 4 INCH POLY ALONG SOUTH CLARK ROAD
IN CEDAR HILL, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS DESOTO SYSTEM INTEGRITY
958 080.75975 (4,043)
INSTALL 580 FEET OF 2 INCH POLY ALONG WOOD STREET IN WINTERS AND ABANDON 500
FEET OF 6 INCH STEEL AND 110 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WINTERS SYSTEM INTEGRITY
959 080.75976 (19,734)
INSTALL 470 FEET OF 6 INCH POLY ALONG NINTH STREET IN BALLINGER AND ABANCON
470 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS BALLINGER SYSTEM INTEGRITY
960 080.75987 (31)
INSTALL TWO (2) 8 INCH STOPPLES AND FOUR (4) 2 INCH TOR TO REPAIR A LEAK ON LINE
232 IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
961 080.75994 (63,543)
INSTALL DISTRICT REGULATOR STATION #04, 885 FEET OF 4 INCH, 25 FEET OF 2 INCH
POLY ALONG SOUTH BOND STREET AND WEST SPRUCE STREET IN WHITEWRIGHT AND
ABANDON DISTRICT REGULATOR STATION #041, 34 FEET OF 3 INCH, 20 FEET OF 2 INCH
STEEL AND 62 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS WHITEWRIGHT SYSTEM INTEGRITY
962 080.76004 (537)
INSTALL 120 FEET OF 8 INCH POLY ALONG MOUNT VIEW AVENUE AND ABANDON 120 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
963 080.76012 (15,209)
INSTALL 1,175 FEET OF 2 INCH AND 215 FEET OF 4 INCH POLY ALONG RYAN PLACE DRIVE
AND ABANDON 1,065 FEET OF OF 3 INCH STEEL, 70 FEET OF 3 INCH AND 60 FEET OF 4
INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
964 080.76018 (7,479)
INSTALL 330 FEET OF 6 INCH POLY ALONG FM 2818 AND ABANDON 330 FEET OF 6 INCH
POLY TO ACCOMODATE CITY OF COLLEGE STATION STREET PROJECT IN ACCORDANCE
WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY
965 080.76024 (45,850)
INSTALL DISTRICT REGULATOR STATION #07 AND 70 FEET OF 2 INCH, 40 FEET OF 4 INCH
POLY ALONG NORTH WOOD STREET AND MEADOWBRIDGE STREET IN FERRIS AND
ABANDON DISTRICT REGULATOR STATION #07 IN ACCORDANCE WITH RAIL ROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FERRIS SYSTEM INTEGRITY
966 080.76025 (36,759)
INSTALL DISTRICT REGULATOR STATION #01 40 FEET OF 2 INCH AND 40 FEET OF 4 INCH
POLY ALONG SOUTH CHURCH STREET AND WEST 6TH STREET IN FERRIS AND ABANDON
DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS FERRIS SYSTEM INTEGRITY
967 080.76026 (1,172)
INSTALL 575 FEET OF 4 INCH POLY ALONG THE ALLEY OF WALKER AND BOND STREET
AND ABANDON 188 FEET OF 3 INCH STEEL AND 199 FEET OF 3 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY
968 080.76027 (1,720)
INSTALL 1,370 FEET OF 6 INCH AND 1,951 FEET OF 2 INCH POLY AND ABANDON 1,352 FEET
OF 8 INCH, 1,742 FEET OF 2 INCH AND 693 FEET OF 1.25 INCH STEEL ALONG RICHLAND
DRIVE AND TENNYSON DRIVE IN WACO, MCCLENNAN COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
969 080.76033 (1,971)
INSTALL 29 FEET OF 4 INCH POLY ALONG MURPHY STREET AND ABANDON 44 FEET OF 6
INCH CAST IRON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
970 080.76039 (36,993)
INSTALL 2,750 FEET OF 2 INCH AND 835 FEET OF 4 INCH POLY ALONG MAYBETH IN
DALLAS AND ABANDON 590 FEET OF 6 INCH, 2,755 FEET OF 4 INCH STEEL AND 10 FEET OF
4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
971 080.76047 (482)
INSTALL 340 FEET OF 2 INCH POLY ALONG WESTWOOD IN ABILENE AND ABANDON 130
FEET OF 3 INCH STEEL AND 70 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAIL ROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
972 080.76052 (677)
INSTALL 375 FEET OF 4 INCH POLY ALONG HIGHWAY 84 AT JEWELL DRIVE AND ABANDON
375 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY
973 080.76055 (91)
INSTALL 50 FEET OF 2 INCH POLY ALONG WILSON AT DUVAL AND ABANDON 45 FEET OF 3
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
974 080.76085 (12,080)
INSTALL 1,430 FEET OF 2 INCH POLY ALONG HODDE STREET AND ABANDON 1,430 FEET
OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
975 080.76087 (13,726)
INSTALL 65 FEET OF 4 INCH, 25 FEET OF 2 INCH POLY AND DISTRICT REGULATOR
STATION #03 ALONG STREETS OF BAIRD AND ABANDON DISTRICT REGULATOR STATION
#03 AND 60 FEET OF 4 INCH STEEL AND 10 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BAIRD SYSTEM INTEGRITY
976 080.76088 (40,999)
INSTALL 370 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #16 ALONG THE
STREETS OF ABILENE AND ABANDON 162 FEET OF 4 INCH AND 10 FEET OF 2 INCH STEEL
AND DISTRICT REGULATOR STATION #16 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
977 080.76089 (24,977)
INSTALL 165 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #28 ALONG THE
STREETS OF ABILENE AND ABANDON 20 FEET OF 2 INCH, 180 FEET OF 4 INCH AND
DISTRICT REGULATOR STATION #28 IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
978 080.76093 (35,581)
INSTALL 2,225 FEET OF 2 INCH POLY ALONG RAYNELLE STREET IN DALLAS AND ABANDON
2,225 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
979 080.76098 (92,382)
INSTALL 1,400 FEET OF 6 INCH, 20 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY ALONG
HALL STREET IN DALLAS AND ABANDON 1,375 FEET OF 8 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
980 080.76101 (35,408)
INSTALL DISTRICT REGULATOR STATION #05, 290 FEET OF 4 INCH AND 150 FEET OF 2
INCH POLY ALONG SOUTH MABEL STREET AND 8TH STREET IN FERRIS AND ABANDON
DISTRICT REGULATOR STATON #05 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS FERRIS SYSTEM INTEGRITY
981 080.76107 (48,829)
INSTALL DISTRICT REGULATOR STATION #47 ALONG IH35E AND TEASLEY ROAD AND
ABANDON DISTRICT REGULATOR STATION #47. ALL CUSTOMERS DENTON SYSTEM INTEGRITY
982 080.76110 (20,406)
INSTALL 20 FEET OF 6 INCH, 10 FEET OF 2 INCH STEEL AND ABANDON 20 FEET OF 6 INCH
AND 10 FEET OF 2 INCH STEEL AT THE AMAZON WAREHOUSE IN FORT WORTH IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
983 080.76111 (16,412)
INSTALL 950 FEET OF 2 INCH POLY ALONG JOLINE AND AVENUE K AND ABANDON 1,005
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
984 080.76120 (232,524)
INSTALL DISTRICT REGULATOR STATION #02 AND 40 FEET OF 4 INCH POLY ALONG
CAMPUS STREET AND EAST 5TH STREET IN FERRIS AND ABANDON DISTRICT REGULATOR
STATION #02 IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FERRIS SYSTEM INTEGRITY
985 080.76121 (6,677)
INSTALL 400 FEET OF 2 INCH POLY ALONG WEST LANE AND ABANDON 400 FEET OF 2
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL SYSTEM INTEGRITY
986 080.76122 (3,096)
INSTALL 676 FEET OF 4 INCH AND 15 FEET OF 2 INCH POLY ALONG BROCKETT STREET
AND ABANDON 601 FEET OF 3 INCH STEEL AND 77 FEET OF 3 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLINSVILLE SYSTEM INTEGRITY
987 080.76127 (21,314)
ABANDON 535 FEET OF 4 INCH AND 575 FEET OF 6 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
988 080.76138 (494)
INSTALL 40 FEET OF 2 INCH, 160 FEET OF 4 INCH POLY AND DISTRICT REGULATOR
STATION #01 ON EAST MARSHALL STREET AND ABANDON 80 FEET OF 3 INCH STEEL, 30
FEET OF 4 INCH AND 160 FEET OF 3 INCH POLY AND DISTRICT REGULATOR STATION #01
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS PALMER SYSTEM INTEGRITY
989 080.76140 (34,647)
INSTALL 40 FEET OF 2 INCH, 40 FEET OF 4 INCH POLY AND DISTRICT REGULATOR
STATION #03 ALONG EAST MARSHALL STREET IN PALMER AND ABANDON 40 FEET OF 3
INCH, 100 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION #03 IN
ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALMER SYSTEM INTEGRITY
990 080.76141 (2,971)
INSTALL 1,200 FEET OF 4 INCH, 1,140 FEET OF 2 INCH ALONG FOREST TRAIL AND
PALMETTO DRIVE IN TEMPLE AND ABANDON 2,250 FEET OF 2 INCH IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY
MTX Retirements
Page 29 of 45
529
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
991 080.76143 (24,847)
INSTALL 1,255 FEET OF 6 INCH, 2,245 FEET OF 4 INCH ALONG WESTMORELAND IN DALLAS
AND ABANDON 1,210 FEET OF 6 INCH, 360 FEET OF 4 INCH, 1,796 FEET OF 3 INCH, AND 338
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
992 080.76145 (14,332)
INSTALL 1,300 FEET OF 6 INCH AND 60 FEET OF 2 INCH POLY ALONG OVERTON STREET
AND ABANDON 1,300 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
993 080.76149 (48,094)
INSTALL 1,900 FEET OF 2 INCH POLY ALONG THE ALLEY BETWEEN EAST ELM STREET AND
EAST PARK STREET FROM IVY STREET TO CORPORATON DRIVE IN HILLSBORO AND
ABANDON 1,845 FEET OF 4 INCH STEEL AND 605 FEET OF 4 INCH POLY IN ACCORDANCE
WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
994 080.76150 (47,947)
INSTALL 1,850 FEET OF 2 INCH POLY ALONG LEONARD STREET AND ABANDON 500 FEET
OF 2 INCH POLY AND 1,225 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL SYSTEM INTEGRITY
995 080.76151 (14,082)
INSTALL 1,065 FEET OF 2 INCH, 25 FEET OF 4 INCH, 1,210 FEET OF 6 INCH POLY ALONG
WORTH WACO STREET AND WEST PASCHAL STREET IN HILLSBORO AND ABANDON 730
FEET OF 2 INCH AND 186 FEET OF 4 INCH STEEL AND 292 FEET OF 2 INCH, 216 FEET OF 4
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
996 080.76155 (460)
ABANDON 299 FEET OF 4 INCH STEEL ALONG GRAYSON AND OAK IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA SYSTEM INTEGRITY
997 080.76160 (9,247)
INSTALL TWO (2) INCH MOONEY REGULATORS ON MCKINNEY DISTRICT REGULATOR
STATION #04 AND ABANDON TWO (2) 1 INCH MOONEY REGULATOR TO INCREASE
CAPACITY.ALL CUSTOMERS MCKINNEY SYSTEM IMPROVEMENT
998 080.76161 (26,461)
INSTALL 300 FEET OF 2 INCH POLY ALONG GEORGE AVENUE AND ABANDON 280 FEET OF
2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL SYSTEM INTEGRITY
999 080.76166 (18,182)
INSTALL 350 FEET OF 4 INCH POLY ALONG HIGHLAND DRIVE AND ABANDON 340 FEET OF
3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
1000 080.76182 (653)
RELOCATE FACILITIES. INSTALL 150 FEET OF 2 INCH POLY TO ALONG KNOLL DRIVE NEAR
CRESTWAY DRIVE.ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
1001 080.76189 (152)
INSTALL 80 FEET OF 2 INCH POLY AND ABANDON 80 FEET OF 2 INCH POLY ALONG
TIMBERVIEW STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY
1002 080.76192 (4,571)
INSTALL 550 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION #13 ALONG
MARSHALL STREET AND ABANDON 50 FEET OF 4 INCH POLY, 404 FEET OF 4 INCH CAST
IRON, 125 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION #13 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
1003 080.76198 (21,212)
INSTALL 2,113 FEET OF 6 INCH POLY ALONG MYRTA STREET AND WHELESS AVENUE, 449
FEET OF 4 INCH POLY ALONG OAK STREET AND HILLCREST AVENUE AND 516 FEET OF 2
INCH POLY ALONG WHELESS AVENUE IN KERRVILLE IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY
1004 080.76199 (21,115)
INSTALL 1,903 FEET OF 2 INCH POLY IN ALLEY BETWEEN WHELESS AVENUE AND
PRESCOTT STREET AND 442 FEET OF 4 INCH POLY ALONG OAKS STREET IN KERRVILLE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY
1005 080.76200 (21,922)
INSTALL 2,397 FEET OF 2 INCH POLY ALONG MOORE STREET AND IN ALLEY BETWEEN
WASHINGTON STREET AND OAK STREET IN KERRVILLE IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY
1006 080.76201 (20,370)
INSTALL 2,607 FEET OF 2 INCH POLY ALONG E. MAIN STREET, JEFFERSON STREET AND
ARANSAS STREET IN KERRVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY
1007 080.76202 (27,805)
INSTALL 2,007 FEET OF 4 INCH POLY ALONG LYTLE STREET AND JEFFERSON STREET AND
662 FEET OF 2 INCH POLY ALONG 1ST STREET IN KERRVILLE, KERR COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY
1008 080.76205 (17,196)
INSTALL 1,762 FEET OF 2 INCH POLY AND ABANDON 1,443 FEET OF 2 INCH STEEL ALONG
CHAMBERLAIN STREET IN IRVING IN ACCORDANCE WITH RAIL ROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS IRVING SYSTEM INTEGRITY
1009 080.76217 (7,983)
INSTALL 2,160 FEET OF 2 INCH POLY ALONG EMBERWOOD AND FAIRWOOD AND
ABANDON 2,110 FEET OF 3 INCH STEEL AND 100 FEET OF 3 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1010 080.76225 (1,023)
ABANDON 270 FEET OF 2 INCH AND 284 FEET OF 4 INCH POLY AND 60 FEET OF 2 INCH
STEEL ALONG AVENUE D AND AVENUE E IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1011 080.76248 (687)
INSTALL 1 REGULATOR AND ABANDON 1 REGULATOR AT WESTLAKE CITY GATE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER SYSTEM INTEGRITY
1012 080.76250 (35,331)
INSTALL 2,170 FEET OF 2 INCH , 330 FEET OF 4 INCH POLY IN THE ALLEY BETWEEN
FAIRWOOD AND GOLDWOOD IN DALLAS AND ABANDON 2,170 FEET OF 3 INCH, 320 FEET
OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1013 080.76256 (42,345)
RELOCATE FACILITIES. INSTALL 65 FEET OF 2 INCH AND 1,050 FEET OF 4 INCH POLY
ALONG ROBERTS CUT OFF AND ABANDON 20 FEET OF 2 INCH POLY AND 1,189 FEET OF 2
INCH STEEL TO ACCOMODATE CITY OF RIVER OAKS STREET PROJECT IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY
1014 080.76259 (9,158)
INSTALL 850 FEET OF 4 INCH POLY ALONG MARY DRIVE AND WILLOW STREET IN HURST
AND ABANDON 786 FEET OF 4 INCH STEEL AND 34 FEET OF 4 INCH POLY IN ACCORDANCE
WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY
1015 080.76260 (10,389)
INSTALL 430 FEET OF 2 INCH AND 1,230 FEET OF 6 INCH POLY ALONG BUENA VISTA DRIVE
IN HURST AND ABANDON 501 FEET OF 1.25 INCH POLY AND 1,800 FEET OF 4 INCH STEEL
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY
1016 080.76262 (10,797)
INSTALL 1,480 FEET OF 2 INCH POLY ALONG WEST CEDAR STREET AND ABANDON 1,436
FEET OF 2 INCH POLY AND 19 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY
1017 080.76263 (15,707)
INSTALL 1,655 FEET OF 4 INCH POLY ALONG WEST OAK STREET AND ABANDON 16 FEET
OF 2 INCH, 87 FEET OF 4 INCH STEEL AND 967 FEET OF 2 INCH, 20 FEET OF 3 INCH, AND 9
FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY
1018 080.76264 (16,019)
INSTALL 2,155 FEET OF 4 INCH POLY ALONG NORWOOD DRIVE AND EAST OAK DRIVE IN
HURST AND ABANDON 217 FEET OF 2 INCH, 17 FEET OF 3 INCH, AND 323 FEET OF 4 INCH
POLY AND 236 FEET OF 3 INCH, 1,067 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY
1019 080.76265 (15,628)
INSATLL 1,534 FEET OF 4 INCH POLY ALONG NORWOOD DRIVE IN HURST AND ABANDON
609 FEET OF 4 INCH POLY AND 1,340 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY
1020 080.76266 (11,077)
INSTALL 1,900 FEET OF 6 INCH POLY ALONG WILLOW STREET AND HARRISON LANE IN
HURST AND ABANDON 1,242 FEET OF 3 INCH AND 14 FEET OF 4 INCH STEEL AND 57 FEET
OF 3 INCH AND 14 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY
1021 080.76267 (6,721)
ISNTALL 1,500 FEET OF 6 INCH POLY ALONG HARRISON LANE AND REDBUD DRIVE IN
HURST AND ABANDON 17 FEET OF 2 INCH AND 1,285 FEET OF 4 INCH STEEL AND 123 FEET
OF 2 INCH AND 178 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY
1022 080.76268 (13,446)
INSTALL 1,293 FEET OF 2 INCH POLY ALONG ELM STREET IN HURST AND ABANDON 1,229
FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY
1023 080.76269 (11,063)
INSTALL 1,250 FEET OF 4 INCH POLY ALONG PECAN STREET IN HURST AND ABANDON 12
FEET OF 4 INCH STEEL AND 1,307 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY
1024 080.76270 (16,280)
ISNTALL 1,765 FEET OF 2 INCH POLY ALONG SOUDER DRIVE AND HARMON ROAD IN
HURST AND ABANDON 1,773 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY
1025 080.76293 (8,500)
INSTALL 43 FEET OF 4 INCH AND 2 FEET OF 4 INCH ALONG WEST WHITE STREET AT
SOUTH WASHINGTON STREET AND ABANDON 35 FEET OF 4 INCH AND 5 FEET OF 2 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PILOT POINT SYSTEM INTEGRITY
MTX Retirements
Page 30 of 45
530
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
1026 080.76315 (15,366)
INSTALL 2,450 FETT OF 6 INCH, 350 FEET OF 2 INCH POLY ALONG BARDFIELD AVENUE
ALLEY FROM KEYSTONE STREET TO SEQUOIA DRIVE AND ABANDON 2,450 FEET OF 6
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1027 080.76330 (23,090)
INSTALL 1,170 FEET OF 6 INCH POLY ALONG BARDFIELD AVENUE ALLEY FROM SEQUOIA
DRIVE TO CENTERVILLE ROAD IN GARLAND AND ABANDON 1,170 FEET OF 6 INCH POLY IN
ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1028 080.76332 (8,992)
INSTALL 2,680 FEET OF 2 INCH POLY ALONG KEYSTONE STREET FROM BARDFIELD
AVENUE TO SHADWELL DRIVE AND ABANDON 2,150 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1029 080.76335 (19,985)
INSTALL 2,450 FEET OF 2 INCH POLY ALONG KAZAK STREET FROM BARDFIELD AVENUE
TO SHADWELL DRIVE AND ABANDON 2,430 FEET OF 2 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1030 080.76338 (14,093)
INSTALL 3,000 FEET OF 2 INCH POLY ALONG KEELE DRIVE FROM BARDFIELD AVENUE TO
SHADWELL DRIVE IN GARLAND AND ABANDON 2,430 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1031 080.76339 (5,140)
INSTALL 2,085 FEET OF 2 INCH POLY AND ABANDON 1,100 FEET OF 2 INCH POLY ALONG
BARDFIELD AVENUE FROM NIAGARA STREET TO CENTERVILEE ROAD IN GARLAND IN
ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1032 080.76343 (9,352)
INSTALL 2,070 FEET OF 2 INCH POLY ALONG NIAGARA STREET FROM CANDLEWOOD LANE
TO BARDFIELD AVENUE IN GARLAND AND ABANDON 1,320 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1033 080.76346 (4,970)
INSTALL 920 FEET OF 2 INCH POLY ALONG SEQUOIA DRIVE FROM NIAGARA STREET TO
BARDFIELD AVENUE IN GARLAND AND ABANDON 900 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1034 080.76347 (5,857)
INSTALL 1,210 FEET OF 2 INCH POLY ALONG CASHMERE DRIVE FROM NIAGARA STREET
TO BARDFIELD AVENUE IN GARLAND AND ABANDON 1,200 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1035 080.76349 (4,752)
INSTALL 1,110 FEET OF 2 INCH POLY ALONG MAYFIELD AVENUE FROM KEELE DRIVE TO
CANDLEWOOD LANE IN GARLAND AND ABANDON 750 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1036 080.76350 (11,057)
INSTALL 1,270 FEET OF 2 INCH POLY ALONG CANDLEWOOD LANE FROM MAYFIELD
AVENUE TO BARDFIELD AVENUE IN GARLAND AND ABANDON 1,300 FEET OF 2 INCH POLY
IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1037 080.76354 (15,732)
INSTALL 2,850 FEET OF 4 INCH POLY ALONG THE STREETS OF COLLINSVILLE AND
ABANDON 1,630 FFET OF 3 INCH STEEL, 320 FEET OF 3 INCH AND 218 FEET OF 4 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLINSVILLE SYSTEM INTEGRITY
1038 080.76356 (2,483)
INSTALL 1,780 FEET OF 2 INCH POLY ALONG BRAEMAR DRIVE AND ABANDON 1,600 FEET
OF 2 INCH STEEL AND 195 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
1039 080.76364 (261)
INSTALL 80 FEET OF 4 INCH POLY AND ABANDON 60 FEET OF 4 INCH POLY ASSOCIATED
WITH A UTILITY CONFLICT.ALL CUSTOMERS WILMER RELOCATION OF FACILITIES
1040 080.76370 (67)
INSTALL 20 FEET OF 6 INCH STEEL ALONG HK DODGEN LOOP IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY
1041 080.76375 (109,717)
INSTALL DISTRICT REGULATOR STATION #01, 80 FEET OF 4 INCH POLY BETWEEN WEST
3RD STREET AND 2ND STREET IN VENUS AND ABANDON DISTRICT REGULATOR STATION
#01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VENUS SYSTEM INTEGRITY
1042 080.76376 (64,986)
INSTALL 182 SUSL ALONG STREETS IN DUNCANVILLE IN ACCORDANCE WITH RAIL ROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY
1043 080.76378 (2,352)
INSTALL 215 FEET OF 4 INCH POLY ALONG SPEEDWAY AND MARIE AND ABANDON 215
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1044 080.76379 (13,253)
RELOCATE FACILITIES.
INSTALL 1,233 FEET OF 2 INCH AND 2,000 FEET OF 4 INCH POLY ALONG ROBERTS CUT IN
RIVER OAKS AND ABANDON 17 FEET OF 2 INCH POLY AND 1,179 FEET OF 2 INCH AND
1,937 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY
1045 080.76382 (3,425)
INSTALL 1,159 FEET OF 6 INCH, 196 FEET OF 4 INCH AND 735 FEET OF 2 INCH POLY ALONG
WEST CENTRAL AND ABANDON 1,949 FEET OF 2 INCH STEEL AND 160 FEET OF 3 INCH
POLY IN GEORGETOWN, WILLIAMSON COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY
1046 080.76390 (51,213)
INSTALL 2,325 FEET OF 6 INCH POLY ALONG BROCKBANK NORTH OF WALNUT HILL IN
DALLAS AND ABANDON 2,325 FEET OF 6 INCH STEEL AND 10 FEET OF 6 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1047 080.76402 (4,754)
INSTALL 1,785 FEET OF 2 INCH POLY ALONG WHIRLAWAY NEAR HARWICH IN DALLAS AND
ABANDON 1,785 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1048 080.76404 (37)
ABANDON 95 FEET OF 2 INCH STEEL ALONG WEST SYCAMORE STREET IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY
1049 080.76405 (63)
INSTALL 60 FEET OF 2 INCH POLY ALONG DOGWOOD DRIVE AND ABANDON 45 FEET OF 2
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY
1050 080.76419 (19,817)
INSTALL 2,030 FEET OF 2 INCH AND 60 FEET OF 6 INCH POLY ALONG YUMA AND PHOENIX
STREETS AND ABANDON 1,010 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1051 080.76420 (10,893)
INSTALL 1,650 FEET OF POLY ALONG COVINGTON IN WICHITA FALLS AND ABANDON 1,895
FEET OF STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1052 080.76421 (14,253)
INSTALL 1,425 FEET OF 2 INCH POLY ALONG YUMA AND GUNNISON IN WICHITA FALLS AND
ABANDON 825 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1053 080.76422 (4,754)
INSTALL 1,350 FEET OF 2 INCH POLY ALONG CLOVIS AND RUIDOSA IN WICHITA FALLAS
AND ABANDON 865 FEET OF 2 INCH AND 1,020 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1054 080.76425 (141,815)
INSTALL 75 FEET OF 4 INCH POLY ALONG HORNE STREET, 450 FEET OF 2 INCH POLY
ALONG CARVER DRIVE AND HELMICK AVENUE AND ABANDON 450 FEET OF 3 INCH STEEL
AND 30 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1055 080.76426 (8,223)
INSTALL 1,890 FEET OF 2 INCH POLY ALONG RUIDOSA AND YUMA IN WICHITA FALLS AND
ABANDON 1,614 FEET OF 2 INCH AND 133 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1056 080.76428 (3,551)
INSTALL 630 FEET OF 2 INCH POLY ALONG YUMA AND GUNNISON IN WICHITA FALLS AND
ABANDON 510 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1057 080.76429 (3,900)
INSTALL 1,435 FEET OF 2 INCH POLY ALONG SHASTA AND GUNNISON IN WICHITA FALLS
AND ABANDON 454 FEET OF 2 INCH AND 453 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1058 080.76431 (16,693)
INSTALL 95 FEET OF 2 INCH AND 1,220 FEET OF 6 INCH POLY AND ABANDON 936 FEET OF
6 INCH, 522 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG PHOENIX AND
SHASTA IN WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1059 080.76434 (30,843)
INSTALL DISTRICT REGULATOR STATION #04, 40 FEET OF 2 INCH, AND 80 FEET OF 4 INCH
POLY ALONG HILL STREET IN WAXAHACHIE AND ABANDON DISTRICT REGULATOR
STATION #04, 60 FEET OF 2 INCH POLY, 60 FEET OF 2 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY
1060 080.76440 (83,951)
INSTALL DISTRICT REGULATOR STATION #18 AND 1,300 FEET OF 2 INCH POLY ALONG NE
36TH AND EAST MAIN IN GRAND PRAIRIE AND ABANDON DISTRICT REGULATOR STATION
#18, 400 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY
1061 080.76451 (16,467)
INSTALL 3,245 FEET OF 2 INCH POLY INTHE ALLEY OF CARRY IN DALLAS AND ABANDON
2,505 FEET OF 2 INCH, 710 FEET OF 3 INCH STEEL AND 30 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
MTX Retirements
Page 31 of 45
531
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
1062 080.76458 (46,122)
INSTALL 960 FEET OF 12 INCH POLY ALONG SOUTH 2ND STREET AND GURLEY IN WACO
AND ABANDON 960 FEET OF 12 STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
1063 080.76461 (6,876)
INSTALL 2,945 FEET OF 2 INCH POLY ALONG THE ALLEY OF WHIRLAWAY NEAR DALE
CREST IN DALLAS AND ABANDON 2,600 FEET OF 2 INCH STEEL AND 345 FEET OF 2 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1064 080.76468 (5,337)
INSTALL 175 FEET OF 2 INCH POLY ALONG FEATHERSTONE DRIVE AND ABANDON 110
FEET OF 2 INCH POLY IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1065 080.76473 (11,554)
INSTALL DISTRICT REGULATOR STATION #01 AND 30 FEET OF 2 INCH AND 100 FEET OF 4
INCH POLY ALONG WEST 2ND STREET AND NORTH MAIN STREET IN MUENSTER AND
ABANDON DISTRICT REGULATOR STATION #01 AND 68 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MUENSTER SYSTEM INTEGRITY
1066 080.76478 (1,255)
INSTALL 170 FEET OF 4 INCH AND ABANDON 170 FEET OF 2 INCH ALONG CEDARDALE
ROAD IN DALLAS.ALL CUSTOMERS DALLAS SYSTEM IMPROVEMENT
1067 080.76481 (613)
RELOCATE FACILITIES.
INSTALL 80 FEET OF 2 INCH POLY ALONG CHERRY STREET AND ABANDON 80 FEET OF 2
INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY
1068 080.76483 (832)
RELOCATE FACILITIES. INSTALL 225 FEET OF 2 INCH AND 725 FEET OF 4 INCH POLY
ALONG CHRISTOPHER STREET AND ABANDON 200 FEET OF 2 INCH AND 700 FEET OF 4
INCH STEEL TO ACCOMMODATE CITY OF EVERMAN STREET PROJECT IN ACCORDANCE
WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS EVERMAN SYSTEM INTEGRITY
1069 080.76490 (538)
INSTALL 440 FEET OF 4 INCH POLY ALONG AVE A AND 10TH NE AND ABANDON 440 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY
1070 080.76491 (35,202)
INSTALL LINE D GROUNDBED AND RECTIFIER AT 4911+17 AND ABANDON LINE D
GROUNDBED AND RECTIFIER IN ARLINGTON, TARRANT COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY
1071 080.76496 (1,949)
INSTALL 425 FEET OF 2 INCH POLY AND ABANDON 420 FEET OF 2 INCH STEEL ALONG
SHILOH STREET IN GARLAND, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1072 080.76504 (13,528)
RELOCATE FACILITIES.
INSTALL 600 FEET OF 6 INCH POLY ALONG HARRIS RIDGE BOULEVARD AND JOHN HENRY
FAULK DRIVE IN PFLUGERVILLE AND ABANDON 700 FEET OF 6 INCH POLY. ALL CUSTOMERS PFLUGERVILLE RELOCATION OF FACILITIES
1073 080.76508 (10,141)
INSTALL 640 FEET OF 8 INCH POLY ALONG EDGEWOOD TERRACE AND ABANDON 640
FEET OF 8 INCH STEEL TO ACCOMODATE CITY OF FORT WORTH STREET PROJECT IN
ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1074 080.76509 (6,143)
INSTALL 850 FEET OF 2 INCH POLY ALONG SIMMONS DRIVE AND ABANDON 798 FEET OF 4
INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS HURST SYSTEM INTEGRITY
1075 080.76510 (17,827)
INSTALL 1,887 FEET OF 2 INCH, 1,013 FEET OF 4 INCH, 256 FEET OF 6 INCH POLY ALONG
MAIN STREET IN MADISONVILLE AND ABANDON 264 FEET OF 4 INCH, 1,145 FEET OF 3
INCH, 869 FEET OF 2 INCH POLY AND 307 FEET OF 3 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY
1076 080.76511 (43,028)
INSTALL 1,629 FEET OF 2 INCH, 1,150 FEET OF 6 INCH POLY ALONG MAIN STREET IN
MADISONVILLE AND ABANDON 815 FEET OF 4 INCH, 1,095 FEET OF 2 INCH POLY AND 750
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY
1077 080.76513 (8,293)
INSTALL 943 FEET OF 4 INCH, 2,689 FEET OF OF 2 INCH POLY. ABANDON 556 FEET OF 3
INCH, 1,303 FEET OF 2 INCH STEEL AND 263 FEET OF 3 INCH AND 756 FEET OF 2 INCH
POLY ALONG MAY STREET IN MADISONVILLE, MADISON COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY
1078 080.76514 (8,669)
INSTALL 378 FEET OF 2 INCH, 98 FEET OF 4 INCH, 1,960 FEET OF 6 INCH POLY AND
ABANDON 98 FEET OF 4 INCH POLY, 1.972 FEET OF 4 INCH STEEL ALONG MAIN STREET IN
MADISONVILLE, MADISON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY
1079 080.76515 (12,758)
INSTALL 2,032 FEET OF 2 INCH, 1,003 FEET OF 6 INCH POLY AND ABANDON 1,324 FEET OF
2 INCH, 526 FEET OF 4 INCH STEEL AND 406 FEET OF 2 INCH, 468 FEET OF 4 INCH POLY
ALONG MAY STREET IN MADISONVILLE, MADISON COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY
1080 080.76516 (5,700)
INSTALL 420 FEET OF 2 INCH, 2,078 FEET OF 4 INCH POLY AND ABANDON 907 FEET OF 4
INCH, 523 FEET OF 3 INCH, 536 FEET OF 2 INCH STEEL AND 52 FEET OF 3 INCH 44 FEET OF
2 INCH POLY ALONG MAY STREET IN MADISONVILLE, MADISON COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE SYSTEM INTEGRITY
1081 080.76521 (3,163)
INSTALL 380 FEET OF 4 INCH POLY ALONG THE STREETS OF COPPELL AND ABANDON 250
FEET OF 4 INCH POLY AND 130 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COPPELL SYSTEM INTEGRITY
1082 080.76522 (5,659)
INSTALL 1,642 FEET OF 4 INCH ALONG NORTH 27TH STREET FROM PARK LAKE DRIVE TO
EDNA AVENUE IN WACO ABANDON 1,512 FEET OF 2 INCH STEEL AND 125 FEET OF 2 INCH
POLY IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
1083 080.76523 (58,419)
INSTALL 6 FEET OF 10 INCH STEEL ALONG STREETS IN ABILENE AND ABANDON 5 FEET OF
10 INCH STEEL.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
1084 080.76535 (441)
INSTALL 280 FEET OF 2 INCH POLY ALONG CHANDLER AND DAY STREET AND ABANDON
283 FEET OF 3 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE
8.209.ALL CUSTOMERS DENISON SYSTEM INTEGRITY
1085 080.76538 (4,557)
INSTALL 2,520 FEET OF 2 INCH POLY ALONG NORTH 29TH STREET FROM PARK LAKE
DRIVE TO EDNA AVENUE IN WACO AND ABANDON 2,019 FEET OF 2 INCH STEEL, 135 FEET
OF 2 INCH POLY, 299 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209. OF 1.25 INCH POLY ALL CUSTOMERS WACO SYSTEM INTEGRITY
1086 080.76556 (3,570)
INSTALL 2,435 FEET OF 2 INCH POLY ALONG NORTH 31ST STREET FROM PARK LAKE
DRIVE TO EDNA AVENUE IN WACO AND ABANDON 521 FEET OF 2 INCH POLY, AND 1,924
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY
1087 080.76557 (47,605)
INSTALL 1,500 FEET OF 2 INCH POLY ALONG MLK JR BOULEVARD, SOUTH YOUNG
STREET, AND FIERSON STREET IN WAXAHACHIE AND ABANDON 110 FEET OF 3 INCH, 790
FEET OF 2 INCH STEEL, 600 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION
#05 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY
1088 080.76571 (120,012)
INSTALL 20 FEET OF 8 INCH STEEL AT L20-2 STATION IN GEORGETOWN AND ABANDON
SKID BUILT STATION IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY
1089 080.76575 (168,400)
INSTALL 800 FEET OF 2 INCH POLY ALONG SOUTH DALLAS AVENUE AND PECAN STREET
IN LANCASTER AND ABANDON 575 FEET OF 4 INCH POLY AND 130 FEET OF 4 INCH STEEL
AND MAIN LINE REGULATOR #15 NEAR INTERSECTION OF SOUTH LANCASTER HUTCHINS
ROAD AND NOKOMIS ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY
1090 080.76580 (11,061)
INSTALL DISTRICT REGULATOR STATION #01 NORTH OF THE MITCHUM AND COLLEGE
INTERSECTION, 50 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION
#01, 198 FEET OF 3 INCH AND 47 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAIL
ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MALAKOFF SYSTEM INTEGRITY
1091 080.76582 (602)
RELOCATE FACILITIES. INSTALL 2,200 FEET OF 6 INCH AND 20 FEET OF 4 INCH POLY
ALONG WEST BAILEY BOSWELL ROAD IN FORT WORTH AND ABANDON 2,200 FEET OF 4
INCH STEEL TO ACCOMMODATE THE CITE OF FORT WORTH IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1092 080.76587 (22,164)
INSTALL 1,850 FEET OF 12 INCH POLY ALONG JENNINGS AVE AND ABANDON 5 FEET OF 12
INCH POLY IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1093 080.76590 (3,275)
INSTALL 800 FEET OF 4 INCH, 300 FEET OF 2 INCH POLY ALONG SOUTH 31ST IN
CORSICANA AND ABANDON 603 FEET OF 2 INCH, 580 FEET OF 3 INCH POLY AND 106 FEET
OF 2 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY
1094 080.76591 (38,673)
RELOCATE FACILITIES. INSTALL 1,571 FEET OF 6 INCH, 15 FEET OF 4 INCH POLY ALONG
TURNER WARNELL ROAD AND ABANDON 873 FEET OF 6 INCH AND 789 FEET OF 4 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
MTX Retirements
Page 32 of 45
532
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
1095 080.76598 (1,069)
ABANDON 220 FEET OF 4 INCH STEEL AND 315 FEET OF 4 INCH POLY ALONG FIRST
STREET AND LOUISE STREET IN COLLEGE STATION TO ACCOMMODATE
REDEVELOPMENT.ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY
1096 080.76628 (6,341)
INSTALL 2,975 FEET OF 2 INCH POLY ALONG THE STREETS OF GOLDTHWAITE AND
ABANDON 315 FEET OF 2 INCH POLY AND 2,732 FEET OF 2 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GOLDTHWAITE SYSTEM INTEGRITY
1097 080.76633 (696)
RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH AND 5 FEET OF 2 INCH POLY ALONG
MULBERRY AND ABANDON 180 FEET OF 4 INCH AND 5 FEET OF 2 INCH POLY TO
ACCOMODATE UNIVERSITY OF NORTH TEXAS PAVING PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON SYSTEM INTEGRITY
1098 080.76638 (58,585)
INSTALL DISTRICT REGULATOR STATION #23, 75 FEET OF 2 INCH AND 75 FEET OF 4 INCH
POLY ALONG WOODS AND BIRGE STREETS IN SHERMAN AND ABANDON DISTRICT
REGULATOR STATION #23 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY
1099 080.76644 (175,131)
INSTALL 3,060 FEET OF 4 INCH AND 180 FEET OF 2 INCH POLY NEAR THE INTERSECTION
OF GUS THOMASSON AND SHILOH IN DALLAS AND ABANDON 2,840 FEET OF 8 INCH, 25
FEET OF 6 INCH, 415 FEET OF 3 INCH AND 25 FEET OF 2 INCH STEEL AND 20 FEET OF 4
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1100 080.76650 (4,100)
RELOCATE FACILITIES. INSTALL 1,050 FEET OF 4 INCH AND 365 FEET OF 2 INCH POLY
ALONG SOUTH JUDKINS STREET AND ABANDON 1,420 FEET OF 4 INCH AND 190 FEET OF 2
INCH STEEL TO ACCOMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1101 080.76655 (1,743)
RELOCATE FACILITIES. INSTALL 600 FEET OF 4 INCH POLY ALONG EAST BALTIMORE
AVENUE TO ACCOMODATE CITY OF FORT WORTH STREET PROJECT AND ABADNON 570
FEET OF 4 INCH STEEL, 10 FEET OF 4 INCH POLY AND 20 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1102 080.76657 (68,513)
INSTALL 2,460 FEET OF 4 INCH POLY BETWEEN SAN MEDINA AND GUS THOMASSON IN
DALLAS AND ABANDON 2,460 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1103 080.76660 (29,097)
INSTALL 2,765 FEET OF 2 INCH POLY AND ABANDON 2,765 FEET OF 3 INCH STEEL ALONG
SAN MEDINA AND SAN PAULA IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1104 080.76661 (21,758)
INSTALL 1,100 FEET OF 2 INCH AND 600 FEET OF 4 INCH POLY AND ABANDON 174 FEET OF
4 INCH, 310 FEET OF 6 INCH, 742 FEET OF 3 INCH, 350 FEET OF 2 INCH STEEL AND 190
FEET OF 6 INCH 100 FEET OF 2 INCH POLY ALONG WITH DISTRICT REGULATOR STATION
02 LOCATED ON AVE 3 AND EAST 3RD IN BURKBURNETT, WICHITA COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURKBURNETT SYSTEM INTEGRITY
1105 080.76662 (2,089)
INSTALL DISTRICT REGULATOR STATION #13 ALONG 4TH STREET NORTHWEST AND
AVENUE C NORTHWEST IN CHILDRESS AND ABANDON DISTRICT REGULATOR STATION
#13 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY
1106 080.76666 (23,563)
INSTALL 1,548 FEET OF 2 INCH POLY ALONG NORTH THOMPSON STREET, CRAIG STREET
IN HILLSBORO AND ABANDON 769 FEET OF 2 INCH, 350 FEET OF 4 INCH STEEL AND 415
FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
1107 080.76672 (2,227)
INSTALL DISTRICT REGULATOR STATION #03, 65 FEET OF 4 INCH AND 30 FEET OF 6 INCH
POLY ALONG MAIDEN STREET AND ABANDON DISTRICT REGULATOR STATION #03. 15
FEET OF 3 INCH, 15 FEET OF 6 INCH STEEL AND 80 FEET OF 3 INCH, 40 FEET OF 4 INCH,
AND 20 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS VERNON SYSTEM INTEGRITY
1108 080.76673 (4,229)
INSTALL DISTRICT REGULATOR STATION #04 AND 185 FEET OF 4 INCH AND 30 FEET OF 4
INCH POLY ALONG TOLAR AND WICHITA STREET IN VERNON AND ABANDON DISTRICT
REGULATOR STATION #04 AND 90 FEET OF 3 INCH AND 80 FEET OF 6 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY
1109 080.76680 (3,230)
INSTALL DISTRICT REGULATOR STATION DRS015 AND 35 FEET OF 2 INCH 50 FEET OF 6
INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS015 AND 60 FEET OF 2
INCH, 105 FEET OF 6 INCH STEEL AND 5 FEET OF 6 INCH POLY ALONG GRANT STREET IN
WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1110 080.76681 (2,239)
INSTALL 110 FEET OF 2 INCH, 485 FEET OF 4 INCH POLY AND DISTRICT REGULATOR
STATION DRS025 AND ABANDON DISTRICT REGULATOR STATION DRS025 AND 297 FEET
OF 3 INCH POLY AND 17 FEET OF 3 INCH, 12 FEET OF 4 INCH, AND 18 FEET OF 6 INCH
STEEL ALONG GALVESTON STREET IN WICHITA FALLS, WICHITA COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1111 080.76682 (229,342)
INSTALL 2,104 FEET OF 4 INCH POLY ALONG THE STREETS OF FORT WORTH AND
ABANDON 15 FEET OF 8 INCH, 560 FEET OF 6 INCH, 98 FEET OF 4 INCH STEEL AND 240
FEET OF 6 INCH, 1,735 FEET OF 4 INCH, 635 FEET OF 2 INCH POLY AND 2 DISTRICT
REGULATOR STATIONS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1112 080.76684 (2,692)
INSTALL DISTRICT REGULATOR STATION DRS64 AND 325 FEET OF 4 INCH, 325 FEET OF 6
INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS64 AND 21 FEET OF 4 INCH
AND 25 FEET OF 6 INCH STEEL ALONG HARRISON STREET IN WICHITA FALLS, WICHITA
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1113 080.76686 (3,701)
INSTALL DISTRICT REGULATOR STATION DRS118 AND 445 FEET OF 2 INCH, 365 FEET OF 4
INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS118 AND 27 FEET OF 2
INCH POLY, 18 FEET OF 2 INCH, 9 FEET OF 3 INCH, AND 34 FEET OF 4 INCH STEEL IN
WICHITA FALLS, WICHITA COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1114 080.76695 (971,515)
INSTALL MOTORIZED REGULATORS AND ABANDON MOTORIZED REGULATORS ACROSS
THE MDTX SYSTEM FOR 45 LOCATIONS IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY
1115 080.76697 (161,320)
REPLACE DISTRIBUTION MOTORIZED REGULATORS IN 95 LOCATIONS ACROSS THE MDTX
SYSTEM IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY
1116 080.76711 (377)
ABANDON 25 FEET OF 8 INCH POLY ALONG WENDLAND ROAD IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY
1117 080.76713 (10,458)
RELOCATE FACILITIES. INSTALL 119 FEET OF 2 INCH, 2,481 FEET OF 4 INCH POLY AND
ABANDON 1,267 FEET OF 3 INCH, 580 FEET OF 4 INCH POLY AND 133 FEET OF 2 INCH, 518
FEET OF 4 INCH STEEL IN CAMERON, MILAM COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY
1118 080.76714 (12,703)
ABANDON METER TUBE GAP CONTROLLERS AT GENERAL MOTORS ASSEMBLY PLANT
AND FOSTER FORBES LOCATIONS IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
1119 080.76724 (721)
RELOCATE FACILITIES. INSTALL 177 FEET OF 2 INCH POLY ALONG FM 1417 TO
ACCOMMODATE TXDOT WIDENING PROJECT AND ABANDON 150 FEET OF 2 INCH POLY IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN SYSTEM INTEGRITY
1120 080.76726 (954)
ABANDON 127 FEET OF 2 INCH STEEL AND 250 FEET OF 2 INCH POLY ALONG HIGHWAY 79
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1121 080.76731 (66,105)
INSTALL 2,675 FEET OF 2 INCH AND 80 FEET OF 8 INCH POLY ALONG STEPHANIE DRIVE
AND ABANDON 2,675 FEET OF 3 INCH AND 80 FEET OF 8 INCH STEEL IN HALTOM CITY,
TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY
1122 080.76733 (1,793)
ABANDON 595 FEET OF 2 INCH STEEL AND 13 FEET OF 2 INCH POLY ALONG JOHNSON
AND PRINCE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY
1123 080.76738 (395)
INSTALL 230 FEET OF 4 INCH POLY ALONG WHEELER AND ABANDON 210 FEET OF 4 INCH
STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON SYSTEM INTEGRITY
1124 080.76752 (242)
INSTALL 130 FEET OF 4 INCH POLY ALONG NELSON AND ROBERTS AND ABANDON 125
FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS BOWIE SYSTEM INTEGRITY
1125 080.76771 (638)
INSTALL 330 FEET OF 4 INCH POLY ALONG 4TH STREET SOUTHWEST AND ABANDON 309
FEET OF 3 INCH STEEL, 17 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS SYSTEM INTEGRITY
1126 080.76776 (1,768)
RELOCATE FACILITIES. INSTALL 122 FEET OF 6 INCH POLY ALONG MORNINGSTAR
BOULEVARD AND STELLAR WIND DIRVE AND ABANDON 55 FEET OF 6 INCH POLY ALL CUSTOMERS GEORGETOWN RELOCATION OF FACILITIES
MTX Retirements
Page 33 of 45
533
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
1127 080.76778 (196)
RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH POLY ALONG TURTLE COVE STREET
IN ROCKWALL AND ABANDON 190 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY
1128 080.76793 (315)
INSTALL 50 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 45 FEET OF 2 INCH
STEEL AND 5 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS YANTIS SYSTEM INTEGRITY
1129 080.76794 (1,398)
RELOCATE FACILITIES. INSTALL 330 FEET OF 6 INCH POLY ALONG LIVE OAK STREET IN
COMMERCE AND ABANDON 330 FEET OF 6 INCH STEEL. DEVELOPER INSTALLED
FACILITIES.ALL CUSTOMERS COMMERCE RELOCATION OF FACILITIES
1130 080.76799 (99,760)
INSTALL 965 FEET OF 2 INCH, 1,137 FEET OF 4 INCH AND ABANDON 424 FEET OF 3 INCH,
350 FEET OF 2 INCH STEEL, 51 FEET OF 4 INCH AND 770 FEET OF 8 INCH STEEL AND 106
FEET OF 4 INCH, 70 FEET OF 1.25 INCH, 436 FEET OF 2 INCH, 903 FEET OF 3 INCH, 821
FEET OF 6 INCH AND 70 FEET OF 8 INCH POLY AND DISTRICT REGULATOR STATION #10 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY
1131 080.76808 (2,707)
RELOCATE FACILITIES. INSTALL 1,285 FEET OF 4 INCH AND 176 FEET OF 2 INCH POLY
ALONG BULLDOG STADIUM DRIVE AND THIRD STREET IN BURNET AND ABANDON 850
FEET OF 4 INCH POLY.ALL CUSTOMERS BURNET RELOCATION OF FACILITIES
1132 080.76814 (17,888)
RELOCATE FACILITIES. INSTALL 850 FEET OF 2 INCH AND 1,400 FEET OF 6 INCH POLY
ALONG MERRITT STREET IN RIVER OAKS AND ABANDON 1,400 FEET OF 2 INCH AND 575
FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY
1133 080.76819 (9,097)
INSTALL 890 FEET OF 2 INCH POLY ALONG RITA AND CLIFF IN GARLAND AND ABANDON
880 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1134 080.76823 (5,104)
INSTALL 150 FEET OF 6 INCH POLY AND 50 FEET OF 2 INCH POLY ALONG MILAM &
PRESTON STREETS AND ABANDON 150 FEET OF 6 INCH AND 50 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY
1135 080.76826 (485)
REPLACE OUTLET LEG OF DISTRICT REGULATOR STATION DFW#06. INSTALL 7 FEET OF 4
INCH STEEL AND ABANDON 7 FEET OF 2 INCH STEEL AT DFW AIRPORT IN GRAPEVINE. ALL CUSTOMERS GRAPEVINE SYSTEM IMPROVEMENT
1136 080.76831 (49,465)
INSTALL 160 FEET OF 12 INCH, 25 FEET OF 2 INCH AND 20 FEET OF 6 INCH POLY ALONG
HIGHWAY 277 AND ABANDON 150 FEET OF 10 INCH AND 15 FEET OF 6 INCH STEEL AND 20
FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
1137 080.76833 (158,456) ABANDON 273 FEET OF 12 INCH STEEL ALONG STREETS OF MELISSA. ALL CUSTOMERS MELISSA SYSTEM INTEGRITY
1138 080.76835 (16,737)
INSTALL 2,550 FEET OF 4 INCH POLY ALONG THE STREETS OF DALLAS AND ABANDON
2,350 FEET OF 4 INCH STEEL, 200 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1139 080.76841 (9,881)
INSTALL 50 FEET OF 2 INCH AND 1,515 FEET OF 4 INCH POLY ALONG NORTH WASHINGTON
STREET AND MAPLE STREET IN FARMERSVILLE, COLLIN COUNTY AND ABANDON 1,350
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY
1140 080.76842 (11,002)
INSTALL 125 FEET OF 2 INCH AND 1,365 FEET OF 4 INCH POLY ALONG NORTH
WASHINGTON STREET AT HALE STREET IN FARMERSVILLE AND ABANDON 326 FEET OF 3
INCH POLY AND 1,094 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE SYSTEM INTEGRITY
1141 080.76846 (28,552)
INSTALL 755 FEET OF 6 INCH POLY ALONG HIGHWAY 281 IN MARBLE FALLS AND
ABANDON 854 FEET OF 6 INCH POLY. ALL CUSTOMERS MARBLE FALLS RELOCATION OF FACILITIES
1142 080.76848 (684)
INSTALL 5 FEET OF 8 INCH POLY ALONG GREAT OAKS DRIVE IN BRUSHY CREEK AND
ABANDON 8 FEET OF 8 INCH POLY. ALL CUSTOMERS BRUSHY CREEK SYSTEM INTEGRITY
1143 080.76858 (12,537)
RELOCATE FACILITIES. INSTALL 355 FEET OF 6 INCH ALONG GREENVILLE AVENUE IN
ALLEN AND ABANDON 346 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF ALLEN
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN SYSTEM INTEGRITY
1144 080.76862 (2,176)
INSTALL 200 FEET OF 12 INCH STEEL AND ABANDON 200 FEET OF 12 INCH STEEL ALONG
FM 1417 IN SHERMAN, GRAYSON COUNTY. ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES
1145 080.76864 (25,092)
INSTALL 4,095 FEET OF 4 INCH POLY ALONG BURLINGTON ROAD BETWEEN MINTON ROAD
AND EAST MCLEROY BOULEVARD IN SAGINAW AND ABANDON 3,920 FEET OF 4 INCH POLY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY
1146 080.76867 (5,644)
INSTALL GROUNDBED ON L14-1(2ND) IN TEMPLE AND ABANDON GROUNDBED ON L14-
1(2ND) IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY
1147 080.76873 (13,160)
INSTALL 1,075 FEET OF 4 INCH POLY ALONG COLD SPRINGS ROAD TO ACCOMODATE CITY
OF FORT WORTH STREETS PROJECT AND ABANDON 827 FEET OF 4 INCH STEEL AND 300
FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1148 080.76888 (152,111)
INSTALL 793 FEET OF 6 INCH, 61 FEET OF 4 INCH AND 145 FEET OF 2 INCH POLY ALONG
NEW YORK AVENUE AND GLYNN PARKS DRIVE IN ARLINGTON AND ABANDON 765 FEET OF
6 INCH STEEL AND 100 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
1149 080.76889 (21,474)
INSTALL 1,548 FEET OF 4 INCH POLY ALONG LOVERS LANE IN ARLINGTON, TARRANT
COUNTY AND ABANDON 1,550 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
1150 080.76890 (34,133)
INSTALL 1,413 FEET OF 4 INCH POLY ALONG LOVERS LANE AND DANIEL DRIVE IN
ARLINGTON AND ABANDON 1,335 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
1151 080.76891 (17,889)
INSTALL 1,357 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY ALONG LOVERS LANE IN
ARLINGTON AND ABANDON 1,350 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
1152 080.76892 (15,117)
INSTALL 1,056 FEET OF 4 INCH AND 309 FEET OF 2 INCH POLY ALONG LOVERS LANE IN
ARLINGTON, TARRANT COUNTY AND ABANDON 1,050 FEET OF 4 INCH, 145 FEET OF 1.25
INCH STEEL AND 15 FEET OF 4 INCH, 20 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
1153 080.76893 (31,656)
INSTALL 1,038 FEET OF 4 INCH AND 255 FEET OF 2 INCH POLY ALONG GLYNN OAKS DRIVE
IN ARLINGTON AND ABANDON 1,025 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
1154 080.76894 (18,350)
INSTALL 1,360 FEET OF 4 INCH AND 11 FEET OF 2 INCH POLY ALONG GLYNN OAKS DRIVE
IN ARLINGTON, TARRANT COUNTY AND ABANDON 1.365 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
1155 080.76895 (42,961)
INSTALL 1,502 FEET OF 2 INCH POLY AND ABANDON 625 FEET OF 4 INCH AND 220 FEET OF
2 INCH STEEL ALONG RAYBORN DRIVE IN ARLINGTON, TARRANT COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
1156 080.76897 (22,446)
INSTALL 1,551 FEET OF 2 INCH POLY AND ABANDON IN 1,540 FEET OF 4 INCH STEEL
ALONG TUCKER BOULEVARD IN ARLINGTON, TARRANT COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
1157 080.76898 (52,785)
INSTALL 1,533 FEET OF 4 INCH POLY AND ABANDON 1,510 FEET OF 4 INCH STEEL ALONG
GLYNN OAKS DRIVE IN ARLINGTON, TARRANT COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
1158 080.76899 (119,176)
INSTALL 995 FEET OF 4 INCH 335 FEET OF 2 INCH POLY AND ABANDON 940 FEET OF 4
INCH STEEL ALONG BROWNING DRIVE IN ARLINGTON, TARRANT COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
1159 080.76908 (52,246)
INSTALL 209 SUSL ALONG STREETS OF BURNETT AND ABANDON 209 SUSL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURNET SYSTEM INTEGRITY
1160 080.76912 (251,260)
RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH AND 1,275 FEET OF 6 INCH POLY
ALONG ROBERTS CUT OFF ROAD TO ACCOMMODATE CITY OF RIVER OAKS STREET
PROJECT IN RIVER OAKS AND ABANDON 150 FEET OF 3 INCH, 150 FEET OF 4 INCH STEEL,
AND 185 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY
1161 080.76913 (27,034)
INSTALL 805 FEET OF 4 INCH, 3,070 FEET OF 2 INCH POLY ALONG HARLINGEN STREET
FROM ODESSA STREET NORTH IN DALLAS AND ABANDON 495 FEET OF 6 INCH, 1,405 FEET
OF 3 INCH, 1,660 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1162 080.76915 (329,280)
RELOCATE FACILITIES. INSTALL 4,050 FEET OF 4 INCH POLY ALONG LONG AVENUE TO
ACCOMMODATE CITY OF RIVER OAKS STREET PROJECT AND ABANDON 55 FEET OF 2
INCH, 355 FEET OF 3 INCH, AND 3,175 OF 4 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY
MTX Retirements
Page 34 of 45
534
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
1163 080.76925 (3,634)
INSTALL 550 FEET OF 4 INCH POLY ALONG BUTTERNUT STREET AND ABANDON 357 FEET
OF 4 INCH STEEL AND 156 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
1164 080.76929 (1,739)
INSTALL 600 FEET OF 2 INCH POLY ALONG HATCH ROAD TO ACCOMODATE TARRANT
COUNTY STREET PROJECT AND ABANDON 603 FEET OF 2 INCH STEEL IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1165 080.76937 (12,265)
RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY ALONG CHAFFIN DRIVE IN
RICHLAND HILLS AND ABANDON 385 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS SYSTEM INTEGRITY
1166 080.76948 (1,420) ABANDON 404 FEET OF 1.25 INCH POLY ALONG STONEBRIDGE COURT. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
1167 080.76951 (6,653)
INSTALL 1,000 FEET OF 4 INCH POLY ALONG SHILOH ALLEY IN DALLAS AND ABANDON
1,000 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1168 080.76964 (706)
INSTALL 100 FEET OF 2 INCH POLY ALONG GLENVILLE DRIVE AND INTERNATIONAL
PARKWAY AND ABANDON 100 FEET OF 2 INCH POLY IN RICHARDSON, DALLAS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY
1169 080.76965 (54,526)
RELOCATE FACILITIES. INSTALL 700 FEET OF 4 INCH POLY ALONG WEATHERRED DRIVE
IN RICHARDSON AND ABANDON 700 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY
1170 080.76978 (441)
RELOCATE FACILITIES INSTALL 950 FEET OF 4 INCH POLY ALONG THE STREETS OF
GRAPEVINE AND ABANDON 402 FEET OF 3 INCH, 467 FEET OF 4 INCH STEEL AND 264 FEET
OF 3 INCH AND 115 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF GRAPEVINE
STREETS PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS GRAPEVINE SYSTEM INTEGRITY
1171 080.76983 (30,779)
INSTALL 1,600 FEET OF 6 INCH POLY AND ABANDON 1,600 FEET OF 6 INCH BARE STEEL
ALONG VAUGHN BOULEVARD IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1172 080.76988 (881)
INSTALL 50 FEET OF 2 INCH POLY AND ABANDON 100 FEET OF 2 INCH STEEL AND
DISTRICT REGULATOR STATION #21 IN STAMFORD ALONG EAST VANDERBILT STREET IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY
1173 080.76989 (657)
INSTALL 40 FEET OF 2 INCH POLY ALONG TOMIE STREET AND ABANDON 20 FEET OF 2 IN
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUITMAN SYSTEM INTEGRITY
1174 080.76992 (3,828)
INSTALL 200 FEET OF 6 INCH POLY ALONG HILLCREST ROAD AND OHIO DRIVE IN FRISCO
AND ABANDON 139 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS FRISCO SYSTEM INTEGRITY
1175 080.76993 (3,746)
INSTALL 755 FEET OF 2 INCH POLY ALONG THE STREETS OF STEPHENVILLE AND
ABANDON 246 FEET OF 2 INCH AND 84 FEET OF 4 INCH POLY AND 113 FEET OF 2 INCH, 243
FEET OF 4 INCH, 6 FEET OF 6 INCH AND 686 FEET OF 8 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY
1176 080.76998 (55,680)
INSTALL 1,335 FEET OF 2 INCH AND 3,270 FEET OF 4 INCH POLY ALONG FERGUSON ROAD
IN DALLAS AND ABANDON 20 FEET OF 2 INCH, 690 FEET OF 3 INCH, 1,770 FEET OF 4 INCH
AND 3,100 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1177 080.77000 (1,867)
INSTALL 850 FEET OF 2 INCH POLY ALONG OLD NOVICE ROAD IN PARIS AND ABANDON
850 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS PARIS SYSTEM INTEGRITY
1178 080.77012 (12,741)
INSTALL DISTRICT REGULATOR STATION #09 AND 110 OF 2 INCH, 10 FEET OF 4 INCH AND
1,090 FEET OF 6 INCH POLY ALONG MARKET SQUARE STREET AND FRANCHER STREET IN
HILLSBORO AND ABANDON DISTRICT REGULATOR STATION #09, 163 FEET OF 4 INCH , 452
FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
1179 080.77013 (3,314)
ABANDON 645 FEET OF 4 INCH STEEL ALONG BLADE STREET IN GREENVILLE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE SYSTEM INTEGRITY
1180 080.77026 (6)
INSTALL 5 FEET OF 2 INCH POLY ALONG WAYSIDE IN PILOT POINT AND ABANDON 5 FEET
OF 2 INCH POLY.ALL CUSTOMERS PILOT POINT RELOCATION OF FACILITIES
1181 080.77031 (9,535)
INSTALL 950 FEET OF 2 INCH POLY ALONG LEONA AVENUE IN DALLAS AND ABANDON 950
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1182 080.77038 (16,535)
ABANDON 670 FEET OF 3/4 INCH, 72 FEET OF 1.25 INCH STEEL, 699 FEET OF 1.25 POLY
ALONG THE STREETS OF CARBON IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS CARBON SYSTEM INTEGRITY
1183 080.77039 (4,353)
INSTALL 3,160 FEET OF 6 INCH POLY ALONG RAY DRIVE AND JUANITA DRIVE IN DENISON
AND ABANDON 3,320 FEET OF 2 INCH STEEL AND 99 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON SYSTEM INTEGRITY
1184 080.77041 (12)
INSTALL 5 FEET OF 2 INCH POLY ALONG HOLIDAY STREET IN PILOT POINT AND ABANDON
5 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS PILOT POINT SYSTEM INTEGRITY
1185 080.77042 (11,164)
INSTALL 1,290 FEET OF 6 INCH POLY ALONG MARY LAKE DRIVE IN BRYAN AND ABANDON
1,290 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY
1186 080.77043 (965)
INSTALL DISTRICT REGULATOR STATION DRS01, 90 FEET OF 3 INCH AND 60 FEET OF 4
INCH POLY AND ABANDON REGULATOR STATION, 60 FEET OF 3 INCH, 20 FEET OF 2 INCH
POLY AND 20 FEET OF 2 INCH, AND 20 FEET OF 4 INCH STEEL IN OGLESBY, CORYELL
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OGLESBY SYSTEM INTEGRITY
1187 080.77046 (8,599)
INSTALL 1,050 FEET OF 2 INCH, 80 FEET OF 4 INCH POLY ALONG AVENUE A AND AVENUE E
IN ENNIS AND ABANDON 400 FEET OF 2 INCH STEEL AND 650 FEET OF 2 INCH, 80 FEET OF
4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY
1188 080.77048 (9,720)
RELOCATE FACILITIES. INSTALL 860 FEET OF 4 INCH POLY ALONG SADDLE TRAIL TO
ACCOMMODATE TARRANT COUNTY STREET PROJECT AND ABANDON 842 FEET OF 3 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY
1189 080.77049 (16,957)
INSTALL 910 FEET OF 2 INCH, 550 FEET OF 4 INCH POLY ALONG PIMLICO WAY AND
ABANDON 1,158 FEET OF 2 INCH, 200 FEET OF 3 INCH STEEL IN SAGINAW, TARRANT
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY
1190 080.77051 (126,356)
INSTALL 350 FEET OF 6 INCH AND 6,750 FEET OF 12 INCH STEEL ALONG HK DODGEN
LOOP IN TEMPLE AND ABANDON 6,700 FEET OF 6 INCH STEEL ALL CUSTOMERS TEMPLE SYSTEM IMPROVEMENT
1191 080.77054 (25,828)
INSTALL DISTRICT REGULATOR STATION #01, 50 FEET OF 2 INCH AND 25 FEET OF 4 INCH
POLY ALONG COLLEGE STREET BETWEEN GALLOWAY AND BRYAN IN MESQUITE AND
ABANDON DISTRICT REGULATOR STATION #01, 50 FEET OF 2 INCH AND 25 FEET OF 4 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY
1192 080.77055 (3,332)
RELOCATE FACILITIES. INSTALL 65 FEET OF 2 INCH POLY ALONG SOUTH WILSON STREET
AND ABANDON 280 FEET OF 4 INCH POLY TO ACCOMODATE THE CITY OF BURLESON IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY
1193 080.77057 (11,661)
MODIFY DISTRICT REGULATOR STATION DRS04 WITH A NEW RELIEF VALVE STACK.
ABANDON WORKER MONITOR SETUP AND INSTALL 2 INCH 289P RELIEF VALVE WITH
RELIEF VALVE SPOOL. ABANDON 2 INCH FISHER 243 MONITOR REGULATOR IN
BELMEADE, MCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS BELLMEAD SYSTEM INTEGRITY
1194 080.77058 (6,532)
INSTALL GARLAND DISTRICT REGULATOR STATION DRS11, 40 FEET OF 2 INCH, 30 FEET
OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS11, 40 FEET OF 2
INCH POLY, AND 25 FEET OF 4 INCH STEEL IN GARLAND, DALLAS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1195 080.77062 (27,243)
INSTALL DISTRICT REGULATOR STATION DRS01 AND ABANDON DISTRICT REGULATOR
STATION DRS01 IN WHITNEY, HILL COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITNEY SYSTEM INTEGRITY
1196 080.77064 (46,034)
INSTALL DISTRICT REGULATOR STATION #05, 25 FEET OF 2 INCH AND 20 FEET OF 4 INCH
POLY SOUTH LOCUST STREET AND WEST GROSS STREET IN MESQUITE AND ABANDON
DISTRICT REGULATOR STATION #05, 45 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY
1197 080.77069 (965)
INSTALL 310 FEET OF 6 INCH POLY ALONG WEST TRAVIS STREET AND 120 FEET OF 2
INCH POLY ALONG NORTH MILAM STREET IN KERRVILLE AND ABANDON 290 FEET OF 6
INCH STEEL AND 120 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG SYSTEM INTEGRITY
MTX Retirements
Page 35 of 45
535
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
1198 080.77073 (244)
INSTALL DISTRICT REGULATOR STATION #17, 25 FEET OF 2 INCH AND 30 FEET OF 4 INCH
POLY ALONG NORTH SIDE OF KAUFMAN STREET AND AVENUE A IN SEAGOVILLE AND
ABANDON DISTRICT REGULATOR STATION #17 AND 55 FEET OF 3 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEAGOVILLE SYSTEM INTEGRITY
1199 080.77078 (5,152)
RELOCATE FACILITIES. INSTALL 2,625 FEET OF 2 INCH POLY ALONG WILLIAM SPRINGS
ROAD IN LAKE WORTH TO ACCOMMODATE TARRANT COUNTY STREET PROJECT AND
ABANDON 2,908 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH SYSTEM INTEGRITY
1200 080.77080 (465)
INSTALL 440 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 440 FEET OF 2
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLANKET SYSTEM INTEGRITY
1201 080.77086 (1,137)
INSTALL 420 FEET OF 2 INCH POLY ALONG LAMAR STREET IN MERKEL AND ABANDON 520
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS MERKEL SYSTEM INTEGRITY
1202 080.77087 (153)
INSTALL 50 FEET OF POLY ALONG 30TH STREET IN SNYDER AND ABANDON 1.25 INCH
SERVICE LINE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY
1203 080.77091 (7,669)
INSTALL 720 FEET OF 4 INCH AND 230 FEET OF 2 INCH POLY ALONG EAST GRAND IN
COMANCHE AND ABANDON 229 FEET OF 2 INCH AND 510 FEET OF 4 INCH POLY AND 524
FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS COMANCHE SYSTEM INTEGRITY
1204 080.77110 (6,613)
INSTALL 35 FEET OF 2 INCH, 20 FEET OF 6 INCH, 35 FEET OF 4 INCH POLY AND DISTRICT
REGULATOR STATION #03 ALONG AVENUE J NORTH OF 12 STREET IN CISCO AND
ABANDON 10 FEET OF 6 INCH , 5 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR
STATION #03 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY
1205 080.77111 (15,235)
INSTALL 1,960 FEET OF 8 INCH POLY ALONG LEMMON AVENUE AND SHORECREST IN
DALLAS AND ABANDON 2,060 FEET OF 8 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1206 080.77113 (14,992)
INSTALL 1,300 FEET OF 2 INCH POLY ALONG FORD STREET ALLEY FROM EAST AVENUE D
TO CARVER STREET IN GARLAND AND ABANDON 630 FEET OF 4 INCH STEEL AND 370
FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1207 080.77114 (5,191)
INSTALL 1,650 FEET OF 2 INCH POLY ALONG CLARK STREET ALLEY FROM CARVER DRIVE
AND E. AVENUE D IN GARLAND AND ABANDON 1,080 FEET OF 4 INCH STEEL AND 340 FEET
OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1208 080.77156 (9,746)
RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH POLY ALONG HACKAMORE STREET
IN WHITE SETTLEMENT AND ABANDON 15 FEET OF 2 INCH STEEL AND 115 FEET OF 2 INCH
POLY.ALL CUSTOMERS WHITE SETTLEMENT RELOCATION OF FACILITIES
1209 080.77167 (147,182)
INSTALL 1,700 FEET OF 8 INCH POLY AND ABANDON 1,255 FEET OF 8 INCH STEEL ALONG
THE STREETS OF DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1210 080.77198 (71,815)
INSTALL DISTRICT REGULATOR STATION #01, 25 FEET OF 4 INCH POLY ALONG WEST
MARKET STREET AND 2ND STREET IN MABANK AND ABANDON DISTRICT REGULATOR
STATION #01, 27 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MABANK SYSTEM INTEGRITY
1211 080.77208 (4,397)
RELOCATE FACILITIES. INSTALL 304 FEET OF 2 INCH POLY ALONG MAGNOLIA PARK DRIVE
IN RICHLAND HILLS AND ABANDON 292 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS SYSTEM INTEGRITY
1212 080.77217 (1,605)
INSTALL 900 FEET OF 6 INCH, 20 FEET OF 4 INCH POLY ALONG TRAIL LAKE DRIVE IN FORT
WORTH AND ABANDON 900 FEET OF 6 INCH AND 650 FEET OF 2 INCH STEEL AND 20 FEET
OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1213 080.77218 (4,730)
INSTALL 1,600 FEET OF 4 INCH POLY ALONG WEST SPURGEON FROM TRAIL LAKE DRIVE
TO BILGADE AVENUE IN FORT WORTH AND ABANDON 1,600 FEET OF 4 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1214 080.77219 (4,382)
INSTALL 1,365 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY ALONG WEST SPURGEON
STREET FROM BILGLADE ROAD TO WEST DEAD END IN FORT WORTH AND ABANDON
1,300 FEET OF 4 INCH, 50 FEET OF 3 INCH STEEL AND 50 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1215 080.77220 (3,646)
INSTALL 1,050 FEET OF 2 INCH POLY ALONG SOUTH RIDGE TERRACE IN FORT WORTH
AND ABANDON 650 FEET OF 2 INCH POLY AND 400 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1216 080.77224 (7,386)
RELOCATE FACILITIES. INSTALL 1,600 FEET OF 2 INCH POLY ALONG LONG STREET IN
STEPHENVILLE AND ABANDON 473 FEET OF 2 INCH, 38 FEET OF 3 INCH AND 407 FEET OF
4 INCH POLY AND 969 FEET OF 2 INCH AND 425 FEET OF 3 INCH STEEL TO ACCOMMODATE
THE CITY OF STEPHENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE SYSTEM INTEGRITY
1217 080.77263 (4,582)
INSTALL 1,560 FEET OF 2 INCH POLY ALONG CORNISH AVENUE IN FORT WORTH AND
ABANDON 1,560 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1218 080.77264 (7,097)
INSTALL 1,585 FEET OF 4 INCH POLY ALONG STAPLES AVENUE FROM SW LOOP 820 TO
BILGLADE ROAD IN FORT WORTH AND ABANDON 1,585 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1219 080.77265 (2,577)
INSTALL 800 FEET OF 2 INCH POLY ALONG WILLOMET AVENUE IN FORT WORTH AND
ABANDON 700 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1220 080.77267 (8,442)
INSTALL 2,200 FEET OF 6 INCH AND 300 FEET OF 4 INCH POLY ALONG THE STREETS OF
FORT WORTH, TARRANT COUNTY AND ABANDON 900 FEET OF 4 INCH AND 1,600 FEET OF
6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1221 080.77282 (661)
INSTALL 450 FEET OF 4 INCH POLY ALONG WEST KING STREET IN BURLESON AND
ABANDON 260 FEET OF 4 INCH AND 150 FEET OF 2 INCH STEEL AND 50 FEET OF 4 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY
1222 080.77288 (162)
INSTALL 220 FEET OF 2 INCH POLY ALONG ESTES PARKWAY SOUTH OF I-20
INTERSECTION IN LONGVIEW AND ABANDON 220 FEET OF 2 INCH STEEL. ALL CUSTOMERS LONGVIEW RELOCATION OF FACILITIES
1223 080.77291 (2,688)
INSTALL 775 FEET OF 4 INCH POLY ALONG 4TH STREET AND 350 FEET OF 2 INCH POLY
ALONG MARKET STREET IN HONEY GROVE AND ABANDON 770 FEET OF 4 INCH AND 345
FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS HONEY GROVE SYSTEM INTEGRITY
1224 080.77294 (42,607)
INSTALL 1,510 FEET OF 4 INCH AND 30 FEET OF 2 INCH POLY ALONG WEST JEFFERSON
BOULEVARD AND CALUMET AVENUE IN DALLAS AND ABANDON 1,505 FEET OF 4 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1225 080.77296 (32,841)
INSTALL 1,660 FEET OF 2 INCH POLY AND ABANDON 1,195 FEET OF 4 INCH AND 1,695 FEET
OF 2 INCH POLY ALONG VIA ESTRELLA AND VIA JAMES JACOB IN DALLAS, DALLAD
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1226 080.77297 (7,616)
INSTALL 3,745 FEET OF 2 INCH POLY AND ABANDON 3,605 FEET OF 2 INCH STEEL, 50 FEET
OF 4 INCH, 70 FEET OF 2 INCH, AND 90 FEET OF 1.25 FEET OF POLY ALONG JEFFERSON
BOULEVARD AND CALUMET AVENUE IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1227 080.77305 (357,149)
INSTALL 2,700 FEET OF 2 INCH POLY ALONG NE STREET AND NORTH ELM STREET IN
FORT WORTH AND ABANDON DISTRICT REGULATOR STATION #217 AND 70 FEET OF 6
INCH, 35 FEET OF 2 INCH, 2,600 FEET OF 12 INCH STEEL AND 20 FEET OF 4 INCH, 10 FEET
OF 2 INCH, 350 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1228 080.77311 (10,374)
RELOCATE FACILITIES. INSTALL 1,650 FEET OF 2 INCH POLY ALONG SOUTHWEST
JOHNSON TO ACCOMMODATE CITY OF BURLESON STREET PROJECT AND ABANDON 1,650
FEET OF 2 INCH POLY AND 270 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY
1229 080.77319 (26,006)
RELOCATE FACILITIES. INSTALL 450 FEET OF 6 INCH POLY ALONG HERITAGE TRACE
PARKWAY AND ABANDON 450 FEET OF 6 INCH POLY TO ACCOMODATE THE CITY OF FORT
WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
MTX Retirements
Page 36 of 45
536
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
1230 080.77322 (1,218)
INSTALL 450 FEET OF 2 INCH POLY ALONG ENFIELD STREET IN BRYAN AND ABANDON 450
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY
1231 080.77328 (7,037)
INSTALL 2,400 FEET OF 4 INCH AND 300 FEET OF 2 INCH POLY ALONG JEFFERSON
STREET IN SULPHUR SPRINGS AND ABANDON 190 FEET OF 4 INCH POLY, 285 FEET OF 3
INCH, 1,900 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS SULPHUR SPRINGS SYSTEM INTEGRITY
1232 080.77341 (5,951)
INSTALL 1,500 FEET OF 2 INCH POLY ALONG WALDRON AVENUE AND BILGLADE ROAD IN
FORT WORTH AND ABANDON 1,425 FEET OF 2 INCH STEEL AND 75 FEET OF 2 INCH POLY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1233 080.77348 (4,090)
INSTALL 900 FEET OF 2 INCH POLY ALONG LOWELL LANE IN FORT WORTH AND ABANDON
900 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1234 080.77351 (3,493)
ISNTALL 250 FEET OF 4 INCH POLY ALONG NOLAN RIDGE DRIVE IN CLEBURNE AND
ABANDON 250 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY
1235 080.77352 (10,664)
INSTALL RELIEF VALVE ON POTTSBORO CITY GATE AND ABANDON RELIEF VALVE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS POTTSBORO SYSTEM INTEGRITY
1236 080.77357 (3,852)
INSTALL 900 FEET OF 4 INCH AND 320 FEET OF 2 INCH POLY ALONG STAPLES AVENUE
FROM BILGLADE ROAD TO LOWELL LANE AND ABANDON 900 FEET OF 2 INCH POLY AND
250 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1237 080.77371 (422)
ABANDON 433 FEET OF 2 INCH STEEL ALONG THE STREETS OF NORTH RICHLAND HILLS
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS NORTH RICHLAND HILLS SYSTEM INTEGRITY
1238 080.77374 (1,680)
ABANDON 970 FEET OF 2 INCH POLY ALONG THE STREETS OF JASMINE HILLS IN
RICHARDSON DUE TO MAIN BEING INSTALLED OUT OF EASEMENT BY DEVELOPER. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY
1239 080.77383 (42,050)
INSTALL 30 FEET OF 20 INCH STEEL ON LINE D IN DALLAS AND ABANDON 30 FEET OF 20
INCH STEEL.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1240 080.77384 (3,935)
INSTALL 3,128 FEET OF 2 INCH POLY ALONG FM 2208 IN LONGVIEW AND ABANDON 3,128
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY
1241 080.77387 (1,180)
RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 2
INCH POLY EAST OF AVE K AND NORTH OF SPRING CREEK PARKWAY IN PLANO, COLLIN
COUNTY.ALL CUSTOMERS PLANO RELOCATION OF FACILITIES
1242 080.77389 (783)
INSTALL 80 FEET OF 4 INCH, 90 FEET OF 2 INCH POLY ALONG INTERSECTION OF RIDGE
ROAD AND HIDDEN VALLEY IN ROCKWALL AND ABANDON 70 FEET OF 4 INCH AND 80 FEET
OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY
1243 080.77394 (5,209)
RELOCATE FACILITIES. INSTALL 2,530 FEET OF 4 INCH AND 500 FEET OF 2 INCH POLY
ALONG AUTUMN DRIVE AND ABANDON 2,430 FEET OF 4 INCH AND 440 FEET OF 2 INCH
STEEL AND 40 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1244 080.77396 (40,196)
INSTALL 50 FEET OF 8 INCH STEEL ALONG GREAT SOUTHWEST PARKWAY IN GRAND
PRAIRIE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY
1245 080.77401 (26,902)
INSTALL 1,625 FEET OF 4 INCH, 3,245 FEET OF 2 INCH POLY ALONG TUMALO TRAIL AND
ODESSA STREET IN DALLAS AND ABANDON 895 FEET OF 6 INCH, 2,425 FEET OF 3 INCH
STEEL AND 410 FEET OF 3 INCH, 855 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1246 080.77414 (266,929)
INSTALL 610 FEET OF 2 INCH, 1,475 FEET OF 6 INCH POLY ALONG JEFFERSON AND
PATTERSON AND ABANDON 989 FEET OF 1.25 INCH, 452 FEET OF 2 INCH, 1,473 FEET OF 6
INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY
1247 080.77422 (18,746)
INSTALL 2,000 FEET OF 2 INCH POLY ALONG 2ND STREET FROM AVENUE A TO AVENUE E
IN ENNIS AND ABANDON 2,000 OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY
1248 080.77424 (819)
INSTALL 370 FEET OF 2 INCH POLY ALONG THE STREETS OF SAN ANGELO AND ABANDON
250 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY
1249 080.77427 (120)
INSTALL 80 FEET OF 4 INCH POLY ALONG BLUEBONNET HILLS AND AUSTIN DRIVE IN
ENNIS AND ABANDON 80 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY
1250 080.77428 (9,077)
INSTALL 2,321 FEET OF 2 INCH POLY AND ABANDON 884 FEET OF 2 INCH, 420 FEET OF
1.25 FEET STEEL AND 280 FEET OF 2 INCH AND 20 FEET OF 1.25 FEET POLY ALONG
GILMER STREET, ROSS STREET AND 2ND STREET IN KERRVILLE, KERR COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY
1251 080.77429 (36,667)
INSTALL 785 FEET OF 4 INCH, 3,115 FEET OF 2 INCH POLY ALONG INSERSOLL STREET AND
NOMAS STREET AND ABANDON 365 FEET OF 6 INCH, 2,430 FEET OF 3 INCH STEEL AND 5
FEET OF 3 INCH, 785 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1252 080.77430 (26,649)
INSTALL 800 FEET OF 6 INCH POLY ALONG SPRING CREEK PARKWAY IN PLANO AND
ABANDON 800 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS PLANO SYSTEM INTEGRITY
1253 080.77432 (35,318)
INSTALL 1,400 FEET OF 4 INCH AND 1,940 FEET OF 2 INCH POLY AND ABANDON 1,985 FEET
OF 6 INCH, 1.045 FEET OF 3 INCH, AND 10 FEET OF 2 INCH STEEL AND 290 FEET OF 3 INCH,
10 FEET OF 2 INCH POLY ALONG CLYMER STREET AND NOMAS STREET IN DALLAS,
DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1254 080.77434 (11,346)
INSTALL 3,205 FEET OF 2 INCH POLY AND ABANDON 1.034 FEET OF 3 INCH, 572 FEET OF 2
INCH STEEL AND 17 FEET OF 4 INCH, 18 FEET OF 3 INCH, 393 FEET OF 2 INCH AND 225
FEET OF 1.25 INCH POLY ALONG NORTH STREET, GILMER STREET, ROSS STREET AND
1ST STREET IN KERR, KERRVILLE COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY
1255 080.77435 (32,605)
INSTALL 2,020 FEET OF 6 INCH, 220 FEET OF 4 INCH, AND 290 FEET OF 2 INCH POLY AND
ABANDON 1,520 FEET OF 6 INCH, 745 FEET OF 4 INCH, 275 FEET OF 2 INCH STEEL AND 60
FEET OF 6 INCH, 35 FEET OF 3 INCH, AND 60 FEET OF 2 INCH POLY ALONG SINGLEON
BOULEVARD AND BERNAL DRIVE IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1256 080.77441 (387)
RELOCATE FACILITIES. INSTALL 130 FEET OF 4 INCH POLY ALONG SOUTH 5TH STREET AT
THE INTERSECTION OF AZALEA DRIVE IN TEMPLE AND ABANDON 130 FEET OF 3 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY
1257 080.77445 (5,254)
INSTALL 1,900 FEET OF 4 INCH POLY ALONG LAKE HAVASU TRAIL IN FORT WORTH AND
ABANDON 1,375 FEET OF 4 INCH POLY AND 525 FEET OF 4 INCH STEEL IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1258 080.77448 (25,241)
INSTALL 1,100 FEET OF 2 INCH, 900 FEET OF 4 INCH POLY ALONG OAKLAND BOULEVARD
AND BRIDGE STREET AND ABANDON 900 FEET OF 4 INCH, 900 FEET OF 2 INCH STEEL AND
200 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1259 080.77452 (239)
INSTALL 85 FEET OF 2 INCH POLY ON AUSTIN AT 15TH STREET IN WICHITA FALLS AND
ABANDON 75 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1260 080.77456 (1,156)
INSTALL 322 FEET OF 2 INCH STEEL ALONG WEST 14TH STREET AND ABANDON 322 FEET
OF 2 INCH STEELIN BRYAN, BRAZOS COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY
1261 080.77459 (3,557)
INSTALL 1,560 FEET OF 2 INCH POLY ALONG ANTHONY AND BURNETT IN ENNIS AND
ABANDON 920 FEET OF 2 INCH STEEL, 200 FEET OF 1.25 INCH, 170 FEET OF 2 INCH POLY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ENNIS SYSTEM INTEGRITY
1262 080.77461 (2,903)
INSTALL 270 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION DRS28 AND
ABANDON 60 FEET OF 2 INCH AND 5 FEET OF 3 INCH AND 160 FEET OF 4 INCH STEEL AND
DISTRICT REGULATOR STATION DRS28 ALONG THE STREETS OF ABILENE, TAYLOR
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
1263 080.77463 (179)
INSTALL 241 FEET OF 2 INCH POLY ALONG BOB WAY AND CREECHVILLE ROAD IN ENNIS
AND ABANDON 241 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY
MTX Retirements
Page 37 of 45
537
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
1264 080.77474 (168)
INSTALL 275 FEET OF 2 INCH POLY ALONG CROCKETT IN CARROLLTON AND ABANDON 275
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY
1265 080.77505 (6,389)
INTALL 24 .75 INCH POLY SERVICE LINES ALONG BRENTWOOD LANE IN FARMERS
BRANCH AND ABANDON 25 .75 INCH SERVICE LINES IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY
1266 080.77506 (105,792)
RELOCATE FACILITIES. INSTALL 3,300 FEET OF 4 INCH POLY ALONG STREETS OF WHITE
SETTLEMENT, TARRANT COUNTY AND ABANDON 720 FEET OF 2 INCH POLY, 400 FEET OF 2
INCH AND 1,860 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT SYSTEM INTEGRITY
1267 080.77517 (31,167)
RELOCATE FACILITIES. INSTALL 787 FEET OF 2 INCH POLY ALONG FERNHEATH LANE AND
LAWSON ROAD IN DALLAS AND ABANDON 741 FEET OF 2 INCH STEEL TO ACCOMMODATE
THE CITY OF DALLAS WATER, DRAINAGE AND PAVEMENT IMPROVEMENTS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY
1268 080.77519 (21,781)
INSTALL 1,500 FEET OF 2 INCH POLY ALONG LA SOBRINA IN DALLAS IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1269 080.77520 (23,340)
INSTALL 500 FEET OF 4 INCH AND 3,500 FEET OF 2 INCH POLY ALONG BERGEN PLACE
AND HEARTLESS PLACE IN FARMERS BRANCH, DALLAS COUNTY AND ABANDON 500 FEET
OF 4 INCH, AND 3,500 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH SYSTEM INTEGRITY
1270 080.77521 (659,806)
INSTALL DISTRICT REGULATOR STATION #03 AND 975 FEET OF 4 INCH, 40 FEET OF 2 INCH
POLY AND ABANDON DISTRICT REGULATOR STATION #03 AND 430 FEET OF 3 INCH STEEL
AND 1,200 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS CEDAR HILL SYSTEM INTEGRITY
1271 080.77532 (143,056)
INSTALL 1,300 FEET OF 4 INCH, 600 FEET OF 2 INCH POLY ALONG ST LAWRENCE IN FORT
WORTH AND ABANDON 1,150 FEET OF 4 INCH, 600 FEET OF 2 INCH STEEL AND 150 FEET
OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1272 080.77533 (62,697)
INSTALL 1,300 FEET OF 4 INCH AND 120 FEET OF 2 INCH POLY AND ABANDON 1,300 FEET
OF 4 INCH STEEL ALONG ST. LAWRENCE ROAD IN FORT WORTH, TARRANT COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1273 080.77545 (8,723)
INSTALL 1,120 FEET OF 4 INCH POLY ALONG CAMELOT ROAD AT ALTAMESA BOULEVARD
IN FORT WORTH AND ABANDON 730 FEET OF 2 INCH AND 70 FEET OF 4 INCH POLY. ALL CUSTOMERS FORT WORTH SYSTEM IMPROVEMENT
1274 080.77547 (41)
ABANDON VACANT LEAKING SERVICE RISE ALONG FM2318 AND LINE KPD1 IN EASTLAND
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DE LEON SYSTEM INTEGRITY
1275 080.77548 (146,294)
INSTALL DISTRICT REGULATOR STATION #04 ALONG BELTLINE ROAD AND MERRIFIELD
DRIVE IN CEDAR HILL AND ABANDON DISTRICT REGULATOR STATION#04 IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL SYSTEM INTEGRITY
1276 080.77552 (17,084)
INSTALL 1,405 FEET OF 2 INCH ALONG WESTMINISTER STREET IN KERRVILLE AND
ABANDON 642 FEET OF 2 INCH POLY AND 692 FEET OF STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY
1277 080.77570 (49,370)
INSTALL 150 SERVICE LINES ALONG THE STREETS OF DUNCANVILLE (MAPSHEET #039) IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE SYSTEM INTEGRITY
1278 080.77577 (188)
RELOCATE FACILITIES. INSTALL 60 FEET OF 2 INCH POLY ALONG MISSION RIDGE ROAD IN
PLANO AND ABANDON 60 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY
1279 080.77578 (8) PROCEEDS OF GREENVILLE TEXAS BUILDING. ALL CUSTOMERS SYSTEM WIDE STRUCTURES
1280 080.77594 (428)
INSTALL 3 INCH PLUG VALVE, 8 INCH STOPPLE, 3 INCH STOPPLE AND 2 INCH T.O.R. AND
ABANDON NON-OPERABLE 3 INCH PLUG AT RESTLAND STATION ON LINE D IN DALLAS,
DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1281 080.77595 (707)
INSTALL 1,730 FEET OF 4 INCH, 50 FEET OF 2 INCH POLY ALONG RICHLAND DRIVE IN
WACO, MCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY
1282 080.77596 (184,934)
INSTALL 1,700 FEET OF 4 INCH, 360 FEET OF 2 INCH POLY AND ABANDON 1,500 FEET OF 4
INCH AND 60 FEET OF 2 INCH STEEL AND 200 FEET OF 2 INCH AND 300 FEET OF 4 INCH
POLY ALONG CANDLEWOOD ROAD IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1283 080.77598 (258,585)
INSTALL 400 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #01 ALONG 5TH
STREET IN FORRESTON AND ABANDON 250 FEET OF 2 INCH STEEL AND DISTRICT
REGULATOR STATION #01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS FORRESTON SYSTEM INTEGRITY
1284 080.77615 (3,062)
INSTALL 76 FEET OF 8 INCH AND 110 FEET OF 3 INCH POLY AND ABANDON 76 FEET OF 16
INCH STEEL ALONG RECORD CROSSING AND SLEEPY HOLLOW IN DALLAS IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1285 080.77616 (39,930)
INSTALL DISTRICT REGULATOR STATION #01 AND 1,700 FEET OF 4 INCH POLY ALONG
NORTH INTERURBAN STREET AND WEST HICKMAN STREET IN HUTCHINS AND ABANDON
2,500 FEET OF 2 INCH AND 3 INCH STEEL, 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HUTCHINS SYSTEM INTEGRITY
1286 080.77634 (16,591)
INSTALL 2 GROVE PILOTS AND 2 MOONEY PILOTS ALONG FM 1082 AND LINE WA
JUNCTION FOR ABILENE PRISON AND ABANDON 2 GROVE PILOTS AND 2 MOONEY PILOTS
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
1287 080.77637 (797)
INSTALL 25 FEET OF 4 INCH POLY ALONG PRESTON STREET IN DALLAS AND ABANDON 17
FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS UNIVERSITY PARK SYSTEM INTEGRITY
1288 080.77648 (5,745)
INSTALL DISTRICT REGULATOR STATION #14 ALONG AVENUE G AND 18TH STREET IN
CISCO AND ABANDON DISTRICT REGULATOR STATION #14 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO SYSTEM INTEGRITY
1289 080.77670 (550,942)
INSTALL 1,200 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION #01 ALONG
LITTLE STREET AND 1ST STREET IN WILMER AND ABANDON 1,500 FEET OF 3 INCH POLY
AND 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS WILMER SYSTEM INTEGRITY
1290 080.77673 (6,960)
RELOCATE FACILITIES. INSTALL 913 FEET OF 6 INCH AND 224 FEET OF 2 INCH POLY
ALONG WESTMORELAND ROAD AND EAGLE DRIVE AND ABANDON 893 FEET OF 6 INCH
AND 174 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS DESOTO SYSTEM INTEGRITY
1291 080.77674 (19,089)
INSTALL 1,050 FEET OF 4 INCH, 200 FEET OF 2 INCH POLY ALONG CARVER DRIVE FROM
HOPKINS STREET TO FORD STREET ALLEY IN GARLAND AND ABANDON 1,300 FEET OF 4
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1292 080.77675 (7,002)
INSTALL 970 FEET OF 4 INCH POLY ALONG EAST AVENUE EAST FROM HOPKINS STREET
TO SOUTH 1ST STREET IN GARLAND AND ABANDON 840 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1293 080.77693 (23,216)
INSTALL 24 INCH ACTUATED VALVE ALONG THE STREETS OF GARLAND AND ABANDON 24
INCH VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY
1294 080.77708 (23,314)
INSTALL 1,070 FEET OF 4 INCH POLY AND ABANDON 1,700 FEET OF 6 INCH STEEL ALONG I-
45 HWY AND EAST ILLINOIS AVENUE IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1295 080.77710 (161,024)
INSTALL 1,660 FEET OF 4 INCH, 300 FEET OF 2 INCH POLY AND ABANDON 1,550 FEET OF 4
INCH, 240 FEET OF 2 INCH STEEL, 115 FEET OF 4 INCH, 60 FEET OF 2 INCH POLY ALONG
GREEN RIVER TRAIL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1296 080.77714 (5,366)
INSTALL 155 FEET OF 2 INCH AND 40 FEET OF 6 INCH POLY IN THE ALLEY WEST OF
RODGERS FROM MADISON NORTH IN WAXAHACHIE AND ABANDON 989 FEET OF 1.25 FEET
OF, 452 FEET OF 2 INCH AND 1,473 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY
1297 080.77715 (47,719)
INSTALL 670 FEET OF 2 INCH, 1,120 FEET OF 4 INCH, 280 FEET OF 6 INCH POLY AND
ABANDON 1,037 FEET OF 2 INCH, 546 FEET OF 4 INCH, 262 FEET OF 6 INCH STEEL AND
1.097 FEET OF 2 INCH POLY ALONG INTERSECTION OF BETHEL AND OLDHAM IN
WAXAHACHIE, ELLIS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY
1298 080.77716 (143,709)
INSTALL 520 FEET OF 2 INCH, 10 FEET OF 4 INCH, 850 FEET OF 6 INCH POLY AND
ABANDON 80 FEET OF 2 INCH, 30 FEET OF 4 INCH, 800 FEET OF 6 INCH STEEL ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY
MTX Retirements
Page 38 of 45
538
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
1299 080.77717 (13,063)
INSTALL 420 FEET OF 2 INCH, 800 FEET OF 4 INCH POLY AND ABANDON 85 FEET OF 2
INCH, 25 FEET OF 4 INCH POLY AND 205 FEET OF 2 INCH, 1,700 FEET OF 4 INCH STEEL
ALONG OLDHAM AND FLAT IN WAXAHACHIE, ELLIS COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY
1300 080.77721 (18,560)
INSTALL 3,100 FEET OF 2 INCH POLY AND ABANDON 100 FEET OF 1.25 INCH, 3,000 FEET
OF 2 INCH STEEL ALONG OWENS AND LAMPASSAS IN ENNIS, ELLIS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY
1301 080.77724 (999)
INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 2 INCH STEEL ALONG THE
RIGHT OF WAY OF ROSA AND ROWE IN ENNIS, ELLIS COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY
1302 080.77730 (6,084)
INSTALL 880 FEET OF 6 INCH, 700 FEET OF 2 INCH POLY AND ABANDON 880 FEET OF 6
INCH, 625 FEET OF 2 INCH STEEL ALONG MILAM AND CHATFIELD IN ENNIS, ELLIS COUNTY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ENNIS SYSTEM INTEGRITY
1303 080.77736 (3,171)
RELOCATE FACILITIES. INSTALL 125 FEET OF 8 INCH POLY ALONG FISHER ROAD IN
WICHITA FALLS AND ABANDON POLY MAIN IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1304 080.77743 (4,206)
INSTALL 550 FEET OF 2 INCH POLY AND ABANDON 310 FEET OF 1.25 INCH, 160 FEET OF 2
INCH POLY AND 150 FEET OF 2 INCH STEEL ALONG DALLAS AND MADISON IN ENNIS, ELLIS
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY
1305 080.77746 (1,850)
INSTALL 850 FEET OF 2 INCH POLY ALONG EDGEWOOD AND METROPOLITAN IN ENNIS
AND ABANDON 500 FEET OF 2 INCH STEEL AND 350 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY
1306 080.77749 (18,522)
RELOCATE FACILITIES. INSTALL 760 FEET OF 6 INCH POLY ALONG STATE HIGHWAY 6 IN
COLLEGE STATION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS COLLEGE STATION RELOCATION OF FACILITIES
1307 080.77750 (133,872)
INSTALL 1,570 FEET OF 4 INCH POLY AND ABANDON 1,465 FEET OF 4 INCH STEEL, 105
FEET OF 4 INCH POLY ALONG SOUTH RIDGE TERRACE IN FORT WORTH, TARRANT
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1308 080.77751 (9,171)
INSTALL 2,540 FEET OF 4 INCH POLY AND ABANDON 1,678 FEET OF 3 INCH STEEL AND 738
FEET OF 3 INCH POLY ALONG EAST SAUNDERS (FM 814) AND US HWY 69 IN TRENTON,
FANNIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS TRENTON SYSTEM INTEGRITY
1309 080.77755 (222,309)
INSTALL 850 FEET OF 2 INCH, 530 FEET OF 4 INCH, 1,625 FEET OF 8 INCH POLY AND
ABANDON 640 FEET OF 2 INCH, 380 FEET OF 3 INCH, 475 FEET OF 4 INCH, AND 1,595 FEET
OF 8 INCH STEEL ALONG WEBB CHAPEL ROAD IN DALLAS, DALLAS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1310 080.77756 (38,649)
INSTALL DISTRICT REGULATOR STATION #21 ALONG EAST WILLINGHAM STREET AND
COLORADO STREET IN CLEBURNE AND ABANDON DISTRICT REGULATOR STATION #21 IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY
1311 080.77760 (412)
INSTALL 275 FEET OF 2 INCH POLY ALONG MURRAY STREET IN DALLAS AND ABANDON
275 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1312 080.77764 (6,245)
INSTALL 55 FEET OF 2 INCH POLY ALONG ROSSER SQUARE IN DALLAS AND ABANDON 980
FEET OF POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1313 080.77771 (4,524)
INSTALL 1,550 FEET OF 4 INCH POLY ALONG FULLER AVENUE AND SOUTH RIDGE
TERRACE IN FORT WORTH AND ABANDON 1,370 FEET OF 4 INCH STEEL AND 180 FEET OF
4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1314 080.77772 (2,557)
REPLACED REMOTE TERMINAL UNIT (RTU) IN LEWISVILLE THAT WAS HIT AND BURNED TO
THE GROUND BY A CAR.ALL CUSTOMERS LEWISVILLE SYSTEM INTEGRITY
1315 080.77786 (126)
INSTALL 150 FEET OF 2 INCH POLY AND ABANDON 150 FEET OF 2 INCH STEEL ALONG FM
1033 NORTH OF US 287 IN TXDOT ROAD RIGHT OF WAY IN KIRKLAND, CHILDRESS
COUNTY.ALL CUSTOMERS KIRKLAND RELOCATION OF FACILITIES
1316 080.77790 (6,746)
INSTALL 300 FEET OF 6 INCH POLY ALONG ESTERS ROAD IN DALLAS AND ABANDON 160
FEET OF 4 INCH STEEL AND 100 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY
1317 080.77791 (29,229)
INSTALL 2,400 FEET OF 2 INCH POLY ALONG MELITA AVENUE AND OVERTON ROAD IN
FORT WORTH AND ABANDDON 1,280 FEET OF 3 INCH AND 1,120 FEET OF 2 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1318 080.77802 (462)
INSTALL 100 FEET OF 4 INCH POLY ALONG HIGH COUNTRY DRIVE IN CARROLLTON AND
ABANDON 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS CARROLLTON SYSTEM INTEGRITY
1319 080.77810 (26,783)
INSTALL 2,825 FEET OF 2 INCH POLY AND ABANDON 2,800 FEET OF 3 INCH STEEL ALONG
THE ALLEY BETWEEN SAN MARCUS AND SAN PAULA IN DALLAS, DALLAS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1320 080.77812 (18,102)
INSTALL 1,732 FEET OF 2 INCH POLY ALONG BRANCH DRIVE IN GARLAND AND ABANDON
1,706 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1321 080.77819 (1,613)
RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH POLY ALONG LYNWORTH DRIVE
ALLEY IN DALLAS AND ABANDON 600 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1322 080.77823 (7,114)
INSTALL 1,875 FEET OF 2 INCH POLY AND ABANDON 361 FEET OF 1 INCH, 499 FEET OF 2
INCH, 774 FEET OF 4 INCH STEEL AND 15 FEET OF 4 INCH, 767 FEET OF 2 INCH POLY
ALONG 3RD AND AVENUE G IN CHILLICOTHE, HARDEMAN COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILLICOTHE SYSTEM INTEGRITY
1323 080.77825 (1,499)
RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY ALONG TOPHILL LANE AND
ABANDON 700 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1324 080.77826 (87,937)
INSTALL 680 FEET OF 2 INCH, 620 FEET OF 4 INCH POLY ALONG MELITA AND SOUTH
RIDGE TERRACE IN FORT WORTH AND ABANDON 580 FEET OF 2 INCH AND 620 FEET OF 4
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1325 080.77833 (1,021)
ABANDON 550 FEET OF 2 INCH POLY ALONG LEMONTREE LANE ALLEY IN PLANO IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY
1326 080.77840 (8,824)
INSTALL 1,200 FEET OF 6 INCH POLY AT NORTH BRYANT HIGHWAY 87 AND 6TH STREET IN
SAN ANGELO AND ABANDON 1,200 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY
1327 080.77854 (1,611)
INSTALL 570 FEET OF 2 INCH POLY ALONG METROPOLITAN AND CHATFIELD IN ENNIS AND
ABANDON 470 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY
1328 080.77860 (3,128)
INSTALL 1,500 FEET OF 6 INCH POLY ALONG W. NEAL AND HUNT STREETS, 75 FEET OF 4
INCH POLY ALONG HUNT STREET AND 375 FEET OF 2 INCH ALONG BOIS D ARC STREET
AND ABANDON 350 FEET OF 6 INCH, 965 FEET OF 4 INCH, 625 FEET OF 3 INCH STEEL IN
COMMERCE, HUNT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS COMMERCE SYSTEM INTEGRITY
1329 080.77865 (4,122)
INSTALL 40 FEET OF 6 INCH, 1,160 FEET OF 4 INCH AND 40 FEET OF 2 INCH POLY ALONG
FOR MCKAVITT ROAD IN SAN ANGELO AND ABANDON 30 FEET OF 6 INCH AND 1,050 FEET
OF 3 INCH STEEL AND 10 FEET OF 6 INCH AND 40 FEET OF 2 INCH POLY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY
1330 080.77867 (44,967)
INSTALL LOW PRESSURE STATION AT BRYAN DISTRICT REGULATOR STATION DRS03
ALONG HASWELL DRIVIE AND ABANDON BRYAN DISTRICT REGULATOR STATION DRS03 IN
BRYAN, BRAZOS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY
1331 080.77894 (528)
INSTALL LOW PRESSURE STATION AT HEARNE DISTRICT REGULATOR STATION DRS03
AND ABANDON HEARNE DISTRICT REGULATOR STATION DRS03 ALONG THE STREETS OF
HEARNE, ROBERTSON COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS HEARNE SYSTEM INTEGRITY
1332 080.77898 (377)
INSTALL 452 FEET OF 2 INCH POLY ALONG HOLLOMAN STREET IN BRYAN AND ABANDON
452 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS NORMANGEE SYSTEM INTEGRITY
1333 080.77899 (1,435)
INSTALL 670 FEET OF 4 INCH, 285 FEET OF 2 INCH POLY ALONG BILGLADE AND
WESTCREEK IN FORT WORTH AND ABANDON 500 FEET OF 4 INCH, 160 FEET OF 2 INCH
STEEL AND 170 FEET OF 4 INCH AND 125 FEET OF 2 INCH POLY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
MTX Retirements
Page 39 of 45
539
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
1334 080.77905 (79)
RELOCATE FACILITIES. INSTALL 7 SERVICES ALONG CHURCHILL ROAD TO
ACCOMMODATE CITY OF FORT WORTH PAVEMENT PROJECT AND ABANDON 7 SERVICES
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1335 080.77909 (64)
PERFORM CAPITAL INTEGRITY DIGS ALONG LINE CA (2ND) EAST NEAR FORT WORTH AND
INSTALL CLOCKSPRINGS ON DIGS 2017-15 AND 2017-25 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1336 080.77912 (6,061)
INSTALL 550 FEET OF 2 INCH POLY ALONG WALKER AND CREECHVILLE ROAD IN ENNIS,
ELLIS COUNTY AND ABANDON 378 FEET OF 2 INCH STEEL, 272 FEET OF 2 INCH POLY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY
1337 080.77914 (99)
INSTALL 460 FEET OF 2 INCH POLY ALONG WARREN LANE AND ABANDON 460 FEET OF 3
INCH STEEL IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1338 080.77916 (2,535)
INSTALL 372 FEET OF 2 INCH POLY AND 120 FEET OF 4 INCH STEEL ALONG SHAWNEE AND
CREECHVILLE ROAD IN ENNIS, ELLIS COUNTY AND ABANDON 372 FEET OF 2 INCH STEEL
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ENNIS SYSTEM INTEGRITY
1339 080.77920 (4,586)
INSTALL 800 FEET OF 2 INCH, 420 FEET OF 4 INCH POLY ALONG CRETON COURT AND
CORDONE COURT AND ABANDON 800 FEET OF 2 INCH, 420 FEET OF 4 INCH STEEL IN
FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1340 080.77921 (20,502)
INSTALL DISTRICT REGULATOR STATION #01, 40 FEET OF 2 INCH POLY ALONG NORTH
BEAL STREET AND EAST 5TH AVENUE IN BELTON AND ABANDON DISTRICT REGULATOR
STATION #01 AND 40 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY
1341 080.77922 (7,395)
INSTALL REGULATOR SPOOL WITH RELIEF VALVE ALONG SOUTH MAIN STREET AND EAST
AVENUE A IN BELTON AND ABANDON WORKER MONITOR REGULATOR SPOOL AT
DISTRICT REGULATOR STATION #23 IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS BELTON SYSTEM INTEGRITY
1342 080.77923 (1,393)
INSTALL DISTRICT REGULATOR STATION #09, 80 FEET OF 4 INCH AND 2 INCH STEEL
ALONG SOUTH KRANES AVENUE AND WEST MAIN STREET IN CAMERON AND ABANDON
DISTRICT REGULATOR STATION #09, 100 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY
1343 080.77924 (6,822)
INSTALL DISTRICT REGULATOR STATION #01, 50 FEET OF 3 INCH, 50 FEET OF 2 INCH AND
50 FEET OF 4 INCH POLY ALONG EAST NORTH ALLEY STREET AND NORTH 1ST STREET IN
LOTT AND ABANDON DISTRICT REGULATOR STATION #01, 100 FEET OF 3 INCH, 50 FEET
OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS LOTT SYSTEM INTEGRITY
1344 080.77925 (16,208)
INSTALL DISTRICT REGULATOR STATION #02, 50 FEET OF 3 INCH, 50 FEET OF 2 INCH, AND
50 FEET OF 4 INCH POLY ALONG 5TH STREET AND EAST GASSAWAY STREET IN LOTT AND
ABANDON DISTRICT REGULATOR STATION #02, 100 FEET OF 3 INCH AND 50 FEET OF 4
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LOTT SYSTEM INTEGRITY
1345 080.77926 (11,900)
INSTALL DISTRICT REGULATOR STATION #04 AND 200 FEET OF 6 INCH POLY ALONG WEST
H AVENUE AND SOUTH 25TH STREET IN TEMPLE AND ABANDON DISTRICT REGULATOR
STATION #04 AND 200 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY
1346 080.77927 (26,677)
INSTALL DISTRICT REGULATOR STATION #05 AND 200 FEET OF 6 INCH POLY ALONG EAST
GARFIELD AVENUE AND NORTH 8TH STREET IN TEMPLE AND ABANDON DISTRICT
REGULATOR STATION #05 AND 200 FEET OF 6 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY
1347 080.77928 (3,498)
INSTALL DISTRICT REGULATOR STATION #07 ALONG WEST AVENUE L AND SOUTH 21ST
STREET IN TEMPLE AND ABANDON DISTRICT REGULATOR STATION #07 IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY
1348 080.77929 (3,998)
INSTALL NEW REGULATOR SPOOL AND RELIEF VALVE AND ABANDON ONE REGULATOR IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY
1349 080.77930 (4,544)
INSTALL DISTRICT REGULATOR STATION #02, 40 FEET OF 2 INCH AND 40 FEET OF 4 INCH
POLY ALONG NORTH BURNS AVENUE AND EAST 7TH STREET IN CAMERON AND ABANDON
DISTRICT REGULATOR STATION #02 AND 80 FEET OF 4 INCH STEEL IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY
1350 080.77932 1,558
INSTALL REGULATOR SPOOL AND RELIEF VALVE FOR DISTRCT REGULATOR STATION #20
ALONG WEST AVENUE T AND SOUTH 5TH STREET IN TEMPLE AND ABANDON WORKER
MONITOR REGULATOR SPOOL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY
1351 080.77933 (5,908)
INSTALL DISTRICT REGULATOR STATION #21, 40 FEET OF 2 INCH AND 40 FEET OF 4 INCH
POLY ALONG WEST 9TH AVENUE AND KING STREET IN TEMPLE AND ABANDON DISTRICT
REGULATOR STATION, 80 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY
1352 080.77934 (1,375)
INSTALL DISTRICT REGULATOR STATION DRS01, 40 FEET OF 2 INCH, 40 FEET OF 4 INCH
POLY AND ABANDON DISTRICT REGULATOR STATION DRS01, 80 FEET OF 4 INCH STEEL
ALONG THE STREETS OF TROY, BELL COUNTY AND ABANDON DISTRICT REGULATOR
STATION DRS01 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS TROY SYSTEM INTEGRITY
1353 080.77941 (150)
INSTALL 220 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 4 INCH STEEL ALONG
ANDERSON DRIVE IN HURST IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY
1354 080.77960 (4,119)
INSTALL 1,600 FEET OF 4 INCH POLY AND ABANDON 1,600 FEET OF 4 INCH STEEL ALONG
WESTCREEK DRIVE AND CROMART COURT IN FORT WORTH, TARRANT COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1355 080.77961 (547)
RELOCATE FACILITIES. INSTALL 35 FEET OF 4 INCH POLY ALONG THE STREETS OF
BRIDGEPORT.ALL CUSTOMERS BRIDGEPORT RELOCATION OF FACILITIES
1356 080.77970 (7,923)
INSTALL 600 FEET OF 6 INCH POLY ALONG MCKINNEY STREET IN DENTON AND ABANDON
115 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY
1357 080.77971 (1,078)
INSTALL 510 FEET OF 4 INCH, 315 FEET OF 2 INCH POLY AND ABANDON 38 FEET OF 4
INCH, 315 FEET OF 2 INCH STEEL ALONG WESTCREEK DRIVE IN FORT WORTH, TARRANT
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1358 080.77972 (3,907)
RELOCATE FACILITIES. INSTALL 680 FEET OF 4 INCH POLY ALONG SOUTH OAKES STREET
IN SAN ANGELO AND ABANDON 535 FEET OF 4 INCH POLY AND 100 FEET OF 4 INCH
STEEL.ALL CUSTOMERS SAN ANGELO RELOCATION OF FACILITIES
1359 080.77985 (18,669)
INSTALL 1,600 FEET OF 2 INCH POLY AND ABANDON 1,600 FEET OF 3 INCH STEEL ALONG
VEGA COURT IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1360 080.78001 (1,766)
RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG CINNABAR AND
SYMPHONY IN DALLAS AND ABANDON 100 FEET OF 4 INCH POLY. ALL CUSTOMERS DALLAS RELOCATION OF FACILITIES
1361 080.78014 (57,284)
INSTALL 1,310 FEET OF 2 INCH, 120 FEET OF 4 INCH POLY AND ABANDON 1,120 FEET OF 2
INCH AND 120 FEET OF 4 INCH POLY AND 190 FEET OF 2 INCH STEEL ALONG WILLOW
RIDGE ROAD AND LAKE CHARLES AVENUE IN FORT WORTH, TARRANT COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1362 080.78030 (1,443)
INSTALL 600 FEET OF 4 INCH POLY ALONG THE STREETS OF HILLSBORO AND ABANDON
600 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS HILLSBORO SYSTEM INTEGRITY
1363 080.78049 (294)
INSTALL 1,100 FEET OF 4 INCH POLY AND ABANDON 1,100 FEET OF 4 INCH STEEL ALONG
GREEN RIVER TRAIL IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1364 080.78064 (12,189)
INSTALL 100 FEET OF 2 INCH POLY ALONG KILLION AND WALNUT HILL IN DALLAS AND
ABANDON 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS HIGHLAND PARK SYSTEM INTEGRITY
1365 080.78075 (113,682)
RELOCATE FACILITIES. INSTALL 1,160 FEET OF 6 INCH, 680 FEET OF 4 INCH POLY ALONG
ROBERTS CUTOFF IN RIVER OAKS, TARRANT COUNTY AND ABANDON 470 FEET OF 2 INCH,
1,110 FEET OF 6 INCH STEEL AND 250 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS SYSTEM INTEGRITY
MTX Retirements
Page 40 of 45
540
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
1366 080.78081 (946)
INSTALL 250 FEET OF 2 INCH POLY ALONG HUNT STREET IN GORDON AND ABANDON 100
FEET OF 2 INCH AND 150 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORDON SYSTEM INTEGRITY
1367 080.78092 (7,837)
INSTALL RELIEF VALVES AT ATHENS DISTRICT REGULATOR STATION #02 ALONG SOUTH
MURCHISON STREET AND EAST CORSICANA STREET AND DISTRICT REGULATOR STATION
#03 ALONG MACK STREET IN ATHENS IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS ATHENS SYSTEM INTEGRITY
1368 080.78093 (459)
RELOCATE FACILITIES. INSTALL 150 FEET OF 12 INCH STEEL ALONG FINFEATHER DT LINE
AT ESTHER BOULEVARD IN BRYAN AND ABANDON 150 FEET OF 12 INCH STEEL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY
1369 080.78097 (2,135)
ABANDON MAIN LINE REGULATOR #11 ALONG WILLIAMS AND OLYMPIC IN ROCKWALL IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY
1370 080.78104 (1,253)
RELOCATE FACILITIES. INSTALL 755 FEET OF 4 INCH POLY ALONG NORTH COLLEGE
AVENUE AND ABANDON 300 FEET OF 4 INCH STEEL AND 300 FEET OF 2 INCH POLY IN
SNYDER, SCURRY COUNTY.ALL CUSTOMERS SNYDER RELOCATION OF FACILITIES
1371 080.78105 (63,286)
INSTALL DISTRICT REGULATOR STATION #401 ALONG MT. VERNON AVENUE AND MOUNT
VIEW AVENUE IN FORT WORTH AND ABANDON DISTRICT REGULATOR STATION #401 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1372 080.78107 (2,060) REMOVE THE UST AT JOSHUA YARD IN JOSHUA. ALL CUSTOMERS SYSTEM WIDE STRUCTURES
1373 080.78109 (82,222)
INSTALL 1,015 FEET OF 4 INCH, 215 FEET OF 2 INCH POLY AND ABANDON 1,015 FEET OF 4
INCH, 215 FEET OF 2 INCH STEEL ALONG GREEN RIVER TRAIL IN FORT WORTH, TARRANT
COUNTY, IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1374 080.78113 (395)
ABANDON 482 FEET OF 1.25 INCH STEEL ALONG STATE HIGHWAY 64 EAST IN CHAPEL
HILL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TYLER SYSTEM INTEGRITY
1375 080.78125 (39,547)
INSTALL 45 FEET OF 8 INCH POLY ALONG WALNUT AND CENTRAL IN DALLAS AND
ABANDON 45 FEET OF 8 INCH STEEL AND INOPERABLE 8 INCH EMR VALVE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1376 080.78133 (31,076)
INSTALL 1,710 FEET OF 4 INCH, 1,120 FEET OF 2 INCH POLY AND ABANDON 2,830 FEET OF
4 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG GOLDWOOD AND HAVENWOOD IN
DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1377 080.78145 (381)
INSTALL 275 FEET OF 2 INCH POLY ALONG F STREET IN KERRVILLE AND ABANDON 275
FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS KERRVILLE SYSTEM INTEGRITY
1378 080.78149 (880)
RELOCATRE FACILITIES. INSTALL 191 FEET OF 6 INCH AND 227 FEET OF 4 INCH POLY
ALONG HILLSIDE AND JILL ANN IN FORT WORTH AND ABANDON 185 FEET OF 6 INCH AND
200 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF BURLESON STREET PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY
1379 080.78169 (2,381)
INSTALL 525 FEET OF 2 INCH POLY ALONG CROCKETT AND CARLTON IN ENNIS AND
ABANDON 444 FEET OF 2 INCH STEEL AND 65 FEET OF 2 INCH AND 13 FEET OF 4 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS SYSTEM INTEGRITY
1380 080.78172 (16,025)
INSTALL 315 FEET OF 4 INCH AND 2,155 FEET OF 2 INCH POLY AND ABANDON 315 FEET OF
4 INCH, 2,155 FEET OF 3 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG THE ALLEY OF
IVYWOOD AND HAVENWOOD IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1381 080.78173 (1,831)
INSTALL 250 FEET OF 2 INCH POLY ALONG WACO AND CARLTON IN ENNIS AND ABANDON
650 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS ENNIS SYSTEM INTEGRITY
1382 080.78184 (17,668)
INSTALL DISTRICT REGULATOR STATION #13 AND 1,200 FEET OF 4 INCH AND 10 FEET OF 2
INCH POLY ALONG PINE STREET IN RANGER AND ABANDON 158 FEET OF 1.25 INCH, 46
FEET OF 2 INCH, 252 FEET OF 4 INCH POLY AND 589 FEET OF 4 INCH, 68 FEET OF 1.25
INCH, 259 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION #13 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER SYSTEM INTEGRITY
1383 080.78189 (18,720)
INSTALL 735 FEET OF 8 INCH, 1,305 FEET OF 2 INCH POLY AND ABANDON 725 FEET OF 8
INCH, 1305 FEET OF 3 INCH STEEL AND 10 FEET OF 8 INCH POLY ALONG CREST RIDGE DR
AND CASA VIEW ALLEY IN DALLAS, DALLAS COUNTY, IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1384 080.78193 (10,053)
INSTALL 330 FEET OF 4 INCH AND 2,140 FEET OF 2 INCH POLY AND ABANDON 330 FEET OF
4 INCH, 2,140 FEET OF 3 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG THE ALLEY
BETWEEN IVYWOOD AND JADEWOOD NEAR RACINE IN DALLAS, DALLAS COUNTY, IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1385 080.78194 (21,630)
INSTALL 2,035 FEET OF 4 INCH AND 1,315 FEET OF 2 INCH POLY AND ABANDON 960 FEET
OF 4 INCH, 2,390 FEET OF 3 INCH STEEL ALONG THE ALLEY BETWEEN KIRNWOOD AND
JADEWOOD NEAR RACINE IN DALLAS, DALLAS COUNTY, IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1386 080.78226 (1,543)
RELOCATE FACILITIES. INSTALL 7 .75 INCH SERVICE LINES ALONG CROSS BEND ROAD
AND KNOB HILL IN PLANO AND ABANON 7 .75 INCH SERVICE LINES TO ACCOMMODATE
THE CITY OF PLANO'S INSTALLATION OF A SCREENING WALL. ALL CUSTOMERS PLANO RELOCATION OF FACILITIES
1387 080.78229 (487)
INSTALL 400 FEET OF 2 INCH POLY ALONG NORTH CENTRAL AVENUE IN KNOX CITY AND
ABANDON 420 FEET 1.25 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS KNOX CITY SYSTEM INTEGRITY
1388 080.78230 (7,464)
INSTALL 1,580 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY ALONG STREETS OF
SNYDER AND ABANDON 386 FEET OF 3 INCH AND 1,200 FEET OF 4 INCH POLY AND
DISTRICT REGULATOR STATION #14 IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS SNYDER SYSTEM INTEGRITY
1389 080.78233 (1)
RELOCATE FACILITIES. INSTALL 13 SERVICE LINES ALONG CRAVENS ROAD IN FORT
WORTH AND ABANDON 13 SERVICE LINES TO ACCOMMODATE THE CITY OF FORT WORTH
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1390 080.78234 (7,219)
ABANDON 2,675 FEET OF 2 INCH POLY ALONG THE STREETS OF GLEN CROSSING IN
CELINA.ALL CUSTOMERS CELINA SYSTEM INTEGRITY
1391 080.78247 (232)
RELOCATE FACILITIES. INSTALL 25 FEET OF 6 INCH POLY ALONG SOUTH MAIN STREET IN
MANSFIELD AND ABANDON 15 FEET OF 6 INCH POLY. ALL CUSTOMERS MANSFIELD RELOCATION OF FACILITIES
1392 080.78265 (3,737)
ABANDON BRUCEVILLE-EDDY ML-02 AND 843 FEET OF 2 INCH STEEL AND 1,084 FEET OF 2
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRUCEVILLE EDDY SYSTEM INTEGRITY
1393 080.78300 (6,571)
INSTALL 1,865 FEET OF 6 INCH AND 200 FEET OF 2 INCH POLY ALONG ILLINOIS DRIVE AND
MAPLE STREET IN CELINA AND ABANDON 250 FEET OF 3 INCH AND 200 FEET OF 2 INCH
STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA SYSTEM INTEGRITY
1394 080.78301 (17,080)
INSTALL 1,338 FEET OF 6 INCH AND 515 FEET OF 2 INCH POLY AND ABANDON 1,450 FEET
OF 2 INCH POLY ALONG BEECH STREET AND ILLINOIS DRIVE IN CELINA, COLLIN COUNTY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CELINA SYSTEM INTEGRITY
1395 080.78344 (194)
INSTALL 285 FEET OF POLY ALONG CLEVELAND STREET IN NORTH ZULCH AND ABANDON
277 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS NORTH ZULCH SYSTEM INTEGRITY
1396 080.78350 (10,531)
INSTALL 80 FEET OF 2 INCH, 1,610 FEET OF 6 INCH POLY ALONG EAST GARFIELD STREET
AND NORTH 8TH STREET IN TEMPLE AND ABANDON 23 FEET OF 2 INCH, 1,110 FEET OF 4
INCH AND 300 FEET OF STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY
1397 080.78364 (2,207)
RELOCATE FACILITIES. INSTALL 570 FEET OF 4 INCH POLY AND ABANDON 570 FEET OF 4
INCH POLY ALONG GREENS PRAIRIE TRAIL IN COLLEGE STATION, BRAZOS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY
1398 080.78367 (11,866)
INSTALL 400 FEET OF 6 INCH POLY ALONG HIGHWAY 75 AND ABANDON 400 FEET OF 6
INCH POLY IN MCKINNEY, COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY
1399 080.78374 (1,084)
INSTALL 420 FEET OF 2 INCH POLY ALONG MASSIE AND HIGH STREET IN THROCKMORTON
AND ABANDON 500 FEET OF 1 INCH, 20 FEET OF 2 INCH STEEL AND 487 FEET OF 2 INCH
POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THROCKMORTON SYSTEM INTEGRITY
MTX Retirements
Page 41 of 45
541
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
1400 080.78378 (94)
ABANDON 104 FEET OF 2 INCH STEEL ALONG POLK AT AVENUE L IN WICHITA FALLS IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1401 080.78379 (8,366)
INSTALL 125 FEET OF 8 INCH POLY ALONG HEIGHTS BOULEVARD AND FM2181 IN DENTON
AND ABANDON 100 FEET OF POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY
1402 080.78384 (2,611)
INSTALL 7,400 FEET OF 4 INCH AND 50 FEET OF 2 INCH POLY AND DISTRICT REGULATOR
STATION AND ABANDON 13 FEET OF 4 INCH AND 8 FEET OF 2 INCH POLY ALONG THE
STREETS OF WICHITA FALLS, WICHITA COUNTY. ALL CUSTOMERS WICHITA FALLS RELOCATION OF FACILITIES
1403 080.78386 (23,754)
RELOCATE FACILITIES. INSTALL 1,200 FEET OF 4 INCH POLY ALONG FM 548 IN FORNEY
AND ABANDON 1,400 FEET OF 4 INCH POLY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FORNEY RELOCATION OF FACILITIES
1404 080.78389 (11,258)
INSTALL 1,090 FEET OF 4 INCH, 895 FEET OF 2 INCH POLY AND ABANDON 870 FEET OF 3
INCH, 540 FEET OF 2 INCH STEEL AND 450 FEET OF 2 INCH POLY ALONG LEEWOOD
STREET AND LAPSLEY STREET IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1405 080.78399 (2,672)
INSTALL 2,100 FEET OF 4 INCH POLY AND ABANDON 345 FEET OF 4 INCH POLY ALONG THE
STREETS OF ABILENE, TAYLOR COUNTY. ALL CUSTOMERS ABILENE RELOCATION OF FACILITIES
1406 080.78415 (3,943)
RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH POLY ALONG CABELA DRIVE IN FORT
WORTH AND ABANDON 50 FEET OF 6 INCH POLY TO ACCOMMODATE ONCOR MANHOLE
INSTALLATION.ALL CUSTOMERS FORT WORTH RELOCATION OF FACILITIES
1407 080.78416 (780)
RELOCATE FACILITIES. INSTALL 100 FEET OF 8 INCH POLY ALONG WASHINGTON STREET
AND COLUMBUS AVENUE IN WACO, MCLENNAN COUNTY AND ABANDON 100 FEET OF 8
INCH STEEL.ALL CUSTOMERS WACO RELOCATION OF FACILITIES
1408 080.78422 (1,138) ABANDON 430 FEET OF 3 INCH POLY ALONG ELM STREET IN MCKINNEY. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY
1409 080.78429 (1,525)
INSTALL 750 FEET OF 4 INCH POLY AND ABANDON 750 FEET OF 3 INCH STEEL ALONG
EAST JEFFERSON STREET TO POLK IN WHITNEY, HILL COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITNEY SYSTEM INTEGRITY
1410 080.78456 (20,583)
INSTALL 2,950 FEET OF 4 INCH, 1,900 FEET OF 2 INCH POLY AND ABANDON 2,950 FEET OF
4 INCH AND 2,160 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF GLENN HEIGHTS
DRAINAGE IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS GLENN HEIGHTS SYSTEM INTEGRITY
1411 080.78472 (571,446)
INSTALL 16 INCH EMR-024B VALVE, 16 INCH EMR VALVE, 24 INCH EMR VALVE AND 10 FEET
OF 24 INCH STEEL AND ABANDON 16 INCH EMR-024B VALVE, 16 INCH EMR VALVE, 24 INCH
EMR VALVE AND 10 FEET OF 24 INCH STEEL IN DALLAS, DALLAS COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1412 080.78490 (21)
INSTALL 5 FEET OF 2 INCH POLY ALONG AVENUE L IN WICHITA FALLS AND ABANDON 5
FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1413 080.78506 (5,975)
INSTALL 3,311 FEET OF 2 INCH, 429 FEET OF 4 INCH POLY AND ABANDON 252 FEET OF 2
INCH, 1,637 FEET OF 3 INCH, AND 254 FEET OF 2 INCH STEEL AND 500 FEET OF 2 INCH
POLY ALONG NORTH 14TH STREET AND NORTH 12TH STREET IN TEMPLE, BELL COUNTY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY
1414 080.78508 (1,702)
INSTALL 1,250 FEET OF 2 INCH POLY AND ABANDON 950 FEET OF 2 INCH STEEL, 320 FEET
OF 2 INCH POLY ALONG LOCUST STREET IN AZLE, TARRANT COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AZLE SYSTEM INTEGRITY
1415 080.78526 (2,850)
RELOCATE FACILITIES. INSTALL 700 FEET OF 4 INCH POLY ALONG PARK STREET AND
CORSICANA HIGHWAY IN HILLSBORO AND ABANDON 335 FEET OF 3 INCH STEEL. ALL CUSTOMERS HILLSBORO RELOCATION OF FACILITIES
1416 080.78528 (5,189)
INSTALL DISTRICT REGULATOR STATION #36 AND #10 AND 45 FEET OF 4 INCH, 360 FEET
OF 2 INCH POLY IN COLEMAN AND ABANDON 162 FEET OF 1.25 INCH 15 FEET OF 4 INCH
AND 15 FEET OF 2 INCH POLY, 138 FEET OF 1.25 INCH, 30 FEET OF 4 INCH STEEL AND
DISTRICT REGULATOR STATION #46 AND #10 IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY
1417 080.78530 (19,584)
INSTALL 1,000 FEET OF 6 INCH STEEL AND ABANDON 1,000 FEET OF 6 INCH STEEL FROM
STATION 835+08 TO 845+08 IN LAWN IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS LAWN SYSTEM INTEGRITY
1418 080.78570 (18,165)
INSTALL 370 FEET OF 2 INCH AND 850 FEET OF 4 INCH POLY AND ABANDON 370 FEET OF 2
INCH, 850 FEET OF 4 INCH STEEL ALONG EAST OAK DRIVE IN HURST, TARRANT COUNTY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY
1419 080.78581 (6,871)
INSTALL 560 FEET OF 2 INCH POLY ALONG EAST RENFRO AND EAST ELLISON STREET IN
BURLESON AND ABANDON 1,120 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY
1420 080.78586 (107)
RELOCATE FACILITIES. INSTALL 135 FEET OF 2 INCH POLY ALONG HIGHWAY 82 AND
TEXOMA PARKWAY IN SHERMAN AND ABANDON 2 INCH STEEL RISER AND DOUBLE
METER LOOP.ALL CUSTOMERS SHERMAN RELOCATION OF FACILITIES
1421 080.78589 (14,479)
INSTALL 2,650 FEET OF 2 INCH POLY ALONG MCNEIL AND SCYENE IN DALLAS AND
ABANDON 2,650 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1422 080.78595 (14)
RELOCATE FACILITIES. INSTALL 275 FEET OF 2 INCH POLY ALONG ENTERPRISE WAY IN
GREENVILLE AND ABANDON 17 FEET OF 2 INCH POLY. DEVELOPER INSTALLED
FACILITIES.ALL CUSTOMERS GREENVILLE RELOCATION OF FACILITIES
1423 080.78613 (18,914)
INSTALL 955 FEET OF 4 INCH AND 1,400 FEET OF 2 INCH POLY AND ABANDON 940 FEET OF
6 INCH, 1,400 FEET OF 3 INCH STEEL AND 55 FEET OF 6 INCH POLY ALONG THE ALLEY OF
SHILOH AND MAYHEW IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1424 080.78621 (2,038)
INSTALL 250 FEET OF 3 INCH, 250 FEET OF 2 INCH POLY AND ABANDON 250 FEET OF 3
INCH, 250 FEET OF 2 INCH STEEL IN MOODY, MCLENNAN COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MOODY SYSTEM INTEGRITY
1425 080.78622 (18,673)
INSTALL 365 FEET OF 4 INCH AND 1,610 FEET OF 2 INCH POLY AND ABANDON 480 FEET OF
6 INCH AND 1,650 FEET OF 3 INCH STEEL ALONG THE ALLEY OF SHILOH AND DUNAWAY IN
DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1426 080.78649 (7,894)
INSTALL 1,741 FEET OF 6 INCH, 60 FEET OF 2 INCH POLY AND ABANDON 680 FEET OF 6
INCH, 200 FEET OF 4 INCH, AND 425 FEET OF 2 INCH STEEL ALONG PINE STREET AND
ANSON AVENUE IN ABILENE, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
1427 080.78659 (170,859)
RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY ALONG THOMPSON DRIVE AND
ABANDON 250 FEET OF 4 INCH STEEL IN RICHARDSON, DALLAS COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY
1428 080.78677 (26,289)
RELOCATE FACILITIES. INSTALL 175 FEET OF 4 INCH POLY ALONG ROOSEVELT AVENUE
AND ABANDON 165 FETE OF 4 INCH STEEL TO ACCOMODATE CITY ALLEY PAVING
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1429 080.78697 (579)
RELOCATE FACILITIES.
INSTALL 1,665 FEET OF 2 INCH, 350 FEET OF 4 INCH POLY AND ABANDON 1,660 FEET OF 2
INCH, 200 FEET OF 3 INCH AND 150 FEET OF 4 INCH STEEL ALONG HUGHES LANE IN
DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1430 080.78705 (4,261)
INSTALL 1,800 FEET OF 6 INCH POLY AND ABANDON 1,800 FEET OF 6 INCH STEEL ALONG
RIGHT OF WAY CROSSING BRAZOS RIVER AND LAKE SHORE DRIVE IN WACO, MCLENNAN
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO SYSTEM INTEGRITY
1431 080.78713 (24,942)
INSTALL 1,255 FEET OF 2 INCH, 350 FEET OF 4 INCH, 1,295 FEET OF 6 INCH POLY AND
ABANDON 1,525 FEET OF 6 INCH STEEL ALONG HOUSTON AVENUE, AND MAIN STREET IN
TEMPLE, BELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY
1432 080.78733 (211)
ABANDON 220 FEET OF 3 INCH POLY NEAR THE INTERSECTION OF COOPER CREEK ROAD
AND US 380 IN DENTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY
1433 080.78739 (217)
INSTALL 5 FEET OF 4 INCH NEAR THE INTERSECTION OF AVENUE A AND WEST MULBERRY
STREET IN DENTON AND ABANDON 5 FEET OF 4 INCH POLY. ALL CUSTOMERS DENTON SYSTEM INTEGRITY
1434 080.78741 (139,554)
INSTALL 17 FARM TAPS BETWEEN KC29 AND KC30 IN CLYDE AND ABANDON 17 FARM
TAPS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLYDE SYSTEM INTEGRITY
MTX Retirements
Page 42 of 45
542
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
1435 080.78757 (1,622)
INSTALL 165 FEET OF 12 INCH STEEL AND ABANDON 140 FEET OF 12 INCH STEEL ALONG
CHESTER AND MISSISSIPPI IN WICHITA FALLAS, WICHITA COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1436 080.78781 (7,395)
REPLACE RELIEF VALVE ON DISTRICT REGULATOR STATION #24 ALONG HIGHWAY 93 IN
BELTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON SYSTEM INTEGRITY
1437 080.78805 (727)
ABANDON 385 FEET OF 2 INCH POLY ALONG WESTERN DRIVE IN BRYAN IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY
1438 080.78806 (71)
RELOCATE FACILITIES. INSTALL 371 FEET OF 2 INCH POLY ALONG GREGG STREET AND
ABANDON 48 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS CALVERT SYSTEM INTEGRITY
1439 080.78810 (12)
INSTALL 5 FEET OF 2 INCH POLY ALONG ELM STREET IN ALVORD AND ABANDON 5 FEET
OF 2 INCH POLY ALL CUSTOMERS ALVORD SYSTEM INTEGRITY
1440 080.78823 (850)
RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH POLY AND ABANDON 500 FEET OF 2
INCH POLY ALONG ROE STREET AND CENTRAL DIRVE IN AZLE, TARRANT COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AZLE SYSTEM INTEGRITY
1441 080.78831 (6,999)
INSTALL 524 FEET OF 2 INCH POLY AND ABANDON 277 FEET OF 2 INCH POLY AND 213
FEET OF 2 INCH AND 204 FEET OF 4 INCH STEEL ALONG SOUTH LANE STREET, WEST
SHOEMAKER AND WEST WARD IN DECATUR, WISE COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR SYSTEM INTEGRITY
1442 080.78832 (297)
RELOCATE FACILITIES. INSTALL 520 FEET OF 2 INCH POLY AND ABANDON 315 FEET OF 2
INCH STEEL ALONG THE STREETS OF GRANDVIEW, JOHNSON COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANDVIEW SYSTEM INTEGRITY
1443 080.78867 (478)
INSTALL 375 FEET OF 2 INCH POLY ALONG EAST 2ND STREET AND MAIN STREET IN
RHOME AND ABANDON 211 FEET OF 2 INCH, 126 FEET OF 4 INCH STEEL AND 8 FEET OF 2
INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RHOME SYSTEM INTEGRITY
1444 080.78868 (10,484)
INSTALL TWO (2) AC UNITS AT ABILENE SERVICE CENTER ON ARNOLD BOULEVARD AND
ABANDON TWO (2) AC UNIT AT ABILENE SERVICE CENTER, ABILENE, TAYLOR COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES
1445 080.78877 (30,313)
INSTALL 750 FEET OF 4 INCH POLY ALONG BAIRD STREET IN CLEBURNE AND ABANDON
7870 FEET OF 4 INCH STEEL AND 130 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE SYSTEM INTEGRITY
1446 080.78884 (1,150)
RELOCATE FACILITIES. INSTALL 787 FEET OF 2 INCH POLY ALONG ARROW POINT DRIVE
AND WHITESTONE BOULEVARD IN CEDAR PARK, WILLIAMSON COUNTY AND ABANDON 594
FEET OF 2 INCH POLY.ALL CUSTOMERS CEDAR PARK RELOCATION OF FACILITIES
1447 080.78892 (1,615)
INSTALL 550 FEET OF 4 INCH POLY ALONG NORTH MAIN STREET AND ABANDON 535 FEET
OF 6 INCH STEEL IN PARIS, LAMAR COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS SYSTEM INTEGRITY
1448 080.78895 (1,627)
INSTALL FLOWSAFE RELIEF VALVE AND ABANDON DEAD WEIGHT RELIEF VALVE ON
DISTRICT REGULATOR STATION DRS70 IN ABILENE, TAYLOR COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE SYSTEM INTEGRITY
1449 080.78896 (27,240)
INSTALL RELIEF VALVE AT BRYAN DISTRICT REGULATOR STATION DRS34 AT THE
INTERSECTION OF MILLS AND EAST 27TH STREET IN BRYAN, BRAZOS COUNTY AND
ABANDON RELIEF VALVE AT BRYAN DISTRICT REGULATOR STATION DRS34 IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN SYSTEM INTEGRITY
1450 080.78898 (705)
INSTALL DISTRICT REGULATOR STATION DRS03, 25 FEET OF 4 INCH, 25 FEET OF 2 INCH
POLY NEAR THE INTERSECTION OF NORTH ALAMO STREET AND WEST BELL STREET IN
BARTLETT, BELL COUNTY AND ABANDON 10 FEET OF 3 INCH, 20 FEET OF 4 INCH STEEL
AND 3 FEET OF 3 INCH POLY AND DISTRICT REGULATOR STATION DRS03 IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BARTLETT SYSTEM INTEGRITY
1451 080.78945 (14,763)
ABANDON 820 FEET OF 2 INCH STEEL, AND 845 FEET OF 2 INCH, 775 FEET OF 1.25 INCH
POLY ALONG SHADY GROVE ROAD, GRAND PRAIRIE, DALLAS COUNTY ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY
1452 080.78957 (6,402)
INSTALL 1,520 FEET OF 2 INCH, 110 FEET OF 4 INCH POLY ALONG NORTH RIDGE ROAD,
TEE HEAD DRIVE AND GREENFIELD ROAD IN FORT WORTH, TARRANT COUNTY AND
ABANDON 90 FEET OF 4 INCH, 415 FEET OF 2 INCH STEEL AND 825 FEET OF 2 INCH AND
180 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1453 080.78971 (5,236)
RELOCATE FACILITIES. INSTALL 415 FEET OF 6 INCH AND 25 FEET OF 3 INCH POLY AND
ABANDON 360 FEET OF 6 INCH AND 90 FEET OF 4 INCH STEEL ALONG THE RIGHT OF WAY
OF NORTH PEARL STREET BETWEEN WEST 11TH AVENUE AND WEST 10TH AVENUE IN
BELTON, BELL COUNTY.ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY
1454 080.78979 (14,607)
INSTALL 950 FEET OF 2 INCH, 250 FEET OF 4 INCH POLY AND ABANDON 1,250 FEET OF 2
INCH STEEL ALONG DOGWOOD TRAIL IN LANCASTER, DALLAS COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER SYSTEM INTEGRITY
1455 080.78981 (2,767)
INSTALL 1,600 FEET OF 4 INCH, 600 FEET OF 2 INCH POLY AND ABANDON 1,600 FEET OF 4
INCH, 500 FEET OF 4 INCH, 160 FEET OF 2 INCH STEEL ALONG COLLEGE HILLS STREET IN
SAN ANGELO, TOM GREEN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY
1456 080.78983 (795)
INSTALL 418 FEET OF 2 INCH POLY AND ABANDON 368 FEET OF 2 INCH STEEL AND 50
FEET OF 2 INCH POLY IN ROCHESTER, HASKELL COUNTY. ALL CUSTOMERS ROCHESTER RELOCATION OF FACILITIES
1457 080.78992 (5,406)
RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG TOPHILL LANE ALLEY
AND ABANDON 900 FEET OF 3 INCH STEEL TO ACCOMODATE THE CITY OF DALLAS ALLEY
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1458 080.79001 (780)
INSTALL 400 FEET OF 4 INCH POLY ALONG FM 91 AND 2379 AND ABANDON 400 FEET OF 3
INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ODELL SYSTEM INTEGRITY
1459 080.79012 (16,930)
ABANDON 460 FEET OF 6 INCH POLY ALONG THE STREETS OF FORT WORTH IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1460 080.79040 (32,628)
ABANDON 4,200 FEET OF 1.25, 1,200 FEET OF 2 INCH POLY ALONG THE STREETS OF
KILLEEN, BELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS KILLEEN SYSTEM INTEGRITY
1461 080.79064 (3,804)
RELOCATE FACILITIES. RELOCATE TWENTY ONE .75 POLY SERVICES ALONG ALLEY
BETWEEN HUNTINGTON AND LAWLER IN GARLAND, DALLAS COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1462 080.79117 (6,361)
INSTALL 12 FEET OF 6 INCH POLY ALONG ALMA DRIVE AND ABADNON 8 FEET OF 6 INCH
POLY TO ACCOMMODATE THE CITY OF PLANO SEWER AND STREET PROJECT IN PLANO,
COLLIN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS PLANO SYSTEM INTEGRITY
1463 080.79126 (18,098)
INSTALL 2,281 FEET 6 INCH, 202 FEET 4 INCH, 814 FEET 2 INCH AND ABANDON 2,200 FEET
6 INCH, 160 FEET 3 INCH, 150 FEET 2 INCH STEEL AND 50 FEET 4 INCH, 50 FEET 1.25 INCH
POLY ALONG AVENUE A AND 33RD STREET IN SNYDER, SCURRY COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER SYSTEM INTEGRITY
1464 080.79137 (808)
INSTALL DISTRICT REGULATOR STATION DRS06, 10 FEET OF 6 INCH, 80 FEET OF 2IN CH,
AND 40 FEET OF 4 INCH POLY AND ABANDON 10 FEET OF 6 INCH, 10 FEET OF 2 INCH, AND
40 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION DRS06 AT INTERSECTION
OF ELIZABETH BOULEVARD AND S RAUPE LANE IN GRANBURY, HOOD COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY SYSTEM INTEGRITY
1465 080.79150 (1,361)
INSTALL 600 FEET OF 2 INCH, 10 FEET OF 6 INCH POLY AND ABANDON 600 FEET OF 2
INCH, 10 FEET OF 6 INCH STEEL ALONG GULF STREET IN CLARKSVILLE, RED RIVER
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLARKSVILLE SYSTEM INTEGRITY
1466 080.79156 (16)
INSTALL 50 FEET OF 2 INCH POLY ALONG COLE AND 6TH IN BELLEVUE AND ABANDON 50
FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS BELLEVUE SYSTEM INTEGRITY
1467 080.79159 (730)
INSTALL DISTRICT REGULATOR DRS06 AT THE INTERSECTION OF EAST OLIVER AND
NORTH SWENSON IN STAMFORD, JONES COUNTY AND ABANDON DISTRICT REGULATOR
STATION DRS06 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS STAMFORD SYSTEM INTEGRITY
1468 080.79209 (1,542)
RELOCATE FACILITIES. INSTALL 550 FEET OF 2 INCH POLY AND ABANDON 550 FEET OF 2
INCH STEEL ALONG FRONT AND ELM STREET IN ARLINGTON, TARRANT COUNTY TO
ACCOMMODATE THE CITY OF ARLINGTON DRAINAGE AND PAVING PLAN IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY
1469 080.79226 (1,241)
RELOCATE FACILITIES. INSTALL 690 FEET OF 2 INCH POLY AND ABANDON 580 FEET OF 2
INCH STEEL ALONG QUAIL TRAIL IN FORT WORTH, TARRANT COUNTY IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
MTX Retirements
Page 43 of 45
543
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
1470 080.79228 (825)
RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH, 60 FEET OF 4 INCH POLY AND
ABANDON 50 FEET OF 6 INCH AND 60 FEET OF 4 INCH STEEL ALONG NEWTON DRIVE IN
BURLESON, JOHNSON COUNTY TO ACCOMMODATE CITY OF BURLESON PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON SYSTEM INTEGRITY
1471 080.79253 (420)
INSTALL DISTRICT REGULATOR STATION DRS07 RELIEF VALVE ALONG INTERSECTION OF
SOUTH AUSTIN AVENUE AND W FIFTH STREET IN GEORGETOWN, WILLIAMSON COUNTY
AND ABANDON DISTRICT REGULATOR STATION DRS07 RELIEF VALVE IN ACCORDANCE
WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN SYSTEM INTEGRITY
1472 080.79288 (326)
INSTALL 235 FEET OF 4 INCH POLY AND ABANDON 235 FEET OF 4 INCH POLY ALONG THE
STREETS OF GREENWAY SUBDIVISION IN CELINA, COLLIN COUNTY. ALL CUSTOMERS CELINA RELOCATION OF FACILITIES
1473 080.79354 (20,332)
ABANDON 50 FEET OF 8 INCH POLY ALONG THE STREETS OF SAPPHIRE BAY
DEVELOPMENT IN ROWLETT, DALLAS COUNTY. ALL CUSTOMERS ROWLETT SYSTEM INTEGRITY
1474 080.79371 (208)
CAPITAL REMEDIATION LINE CUT OUT ON LINE C16(EAST)AND STOPPLEING REQUIRED TO
COMPLETE THE CUT OUT IN IRVING, DALLAS COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING SYSTEM INTEGRITY
1475 080.79374 (5,307)
RELOCATE FACILITIES. INSTALL 1,070 FEET OF 4 INCH POLY AND ABANDON 1,070 FEET
OF 2 INCH STEEL ALONG THE STREETS OF FORT WORTH TO ACCOMODATE CITY OF FORT
WORTH SANITARY SEWER PROJECT IN FORT WORTH, TARRANT COUNTY IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY
1476 080.79388 (1,169)
INSTALL 330 FEET OF 4 INCH POLY ALONG INDEPENDENCE PARKWAY IN PLANO, COLLIN
COUNTY AND ABANDON 330 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO SYSTEM INTEGRITY
1477 080.79411 (15,918)
INSTALL 1,900 FEET OF 8 INCH, 600 FEET OF 4 INCH AND 120 FEET OF 2 INCH POLY AND
ABANDON 845 FEET OF 6 INCH, 80 FEET OF 3 INCH STEEL AND 60 FEET OF 6 INCH, 1,000
FEET OF 4 INCH, 80 FEET OF 2 INCH POLY ALONG COLLEGE HILL BOULEVARD IN SAN
ANGELO IN TOM GREEN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY
1478 080.79440 (1,706)
INSTALL 338 FEET OF 6 INCH AND 97 FEET OF 4 INCH POLY AND ABANDON 338 FEET OF 6
INCH POLY AND 98 FEET OF 4 INCH POLY ALONG WASHINGTON AVENUE IN BRYAN,
BRAZOS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY
1479 080.79485 (381)
INSTALL RELIEF VALVE ON DISTRICT REGULATOR STATION DRS21 AT THE INTERSECTION
OF WILLOW AND NORTH JACKSON IN SAN ANGELO, TOM BEAN COUNTY AND ABANDON
RELIEF VALVE ON DISTRICT REGULATOR STATION DRS21 IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY
1480 080.79529 (2,906)
INSTALL DISTRICT REGULATOR STATION DRS05, 80 FEET OF 4 INCH AND 40 FEET OF 2
INCH POLY AND ABANDON DISTRICT REGULATOR STATION DRS05, 40 FEET OF 3 INCH
STEEL, 40 FEET OF 2 INCH AND 40 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON SYSTEM INTEGRITY
1481 080.79546 (3,604)
INSTALL 350 FEET OF 4 INCH POLY AND ABANDON 350 FEET OF 4 INCH POLY ALONG
ENTERPRISE STREET IN ATHENS, HENDERSON COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS SYSTEM INTEGRITY
1482 080.79557 (690)
INSTALL 600 FEET OF 2 INCH POLY AND 120 FEET OF 4 INCH STEEL AND ABANDON 110
FEET OF 2 INCH POLY AND 490 FEET OF 2 INCH STEEL ALONG EARLY BOULEVARD IN
EARLY, BROWN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS EARLY SYSTEM INTEGRITY
1483 080.79565 (2,191)
INSTALL 440 FEET OF 4 INCH, 10 FEET OF 2 INCH POLY AND ABANDON 440 FEET OF 6
INCH, 5 FEET OF 2 INCH STEEL ALONG MESQUITE STREET IN COLEMAN, COLEMAN
COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN SYSTEM INTEGRITY
1484 080.79575 (78,948)
INSTALL 500 FEET OF 4 INCH, 120 FEET OF 2 INCH, 20 FEET OF 1.25 INCH POLY AND
ABANDON 500 FEET OF 8 INCH, 120 FEET OF 2 INCH AND 20 FEET OF 1.25 INCH STEEL
ALONG 11TH STREET IN CARLSBAD, TOM GREEN COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARLSBAD SYSTEM INTEGRITY
1485 080.79617 (834)
INSTALL DISTRICT REGULATOR STATION DRS06 AND 40 FEET OF 2 INCH, 120 FEET OF 4
INCH POLY AND NEW HIGH FLOW STATION 2X4 STATION AND ABANDON 20 FEET OF 3
INCH, 55 FEET OF 4 INCH STEEL AND 65 FEET OF 4 INCH POLY AND DISTRICT REGULATOR
STATION DRS06 ALONG EAST 6TH STREET AND CEDAR STREET IN COLORADO CITY,
MITCHELL COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS COLORADO CITY SYSTEM INTEGRITY
1486 080.79640 (151) ABANDON 55 FEET OF 3 INCH POLY ALONG ELM STREET IN MCKINNEY, COLLIN COUNTY. ALL CUSTOMERS MCKINNEY SYSTEM INTEGRITY
1487 080.79655 (191)
INSTALL 325 FEET OF 2 INCH POLY AND ABANDON 80 FEET OF 3 INCH, 240 FEET OF 2 INCH
STEEL ALONG 1ST STREET IN MILES, RUNNELS COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILES SYSTEM INTEGRITY
1488 080.79704 (715)
INSTALL 4 INCH VALVE LOCATED AT WICHITA FALLS WEST CITY GATE ALONG SEYMOUR
HIGHWAY IN WICHITA FALLS, WICHITA COUNTY AND ABANDON EMR-107 VALVE IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS SYSTEM INTEGRITY
1489 080.79706 (5,991)
INSTALL 880 FEET OF 6 INCH, 120 FEET OF 2 INCH, 80 FEET OF 4 INCH POLY AND
ABANDON 860 FEET OF 6 INCH, 120 FEET OF 2 INCH STEEL ALONG PAINT ROCK ROAD IN
SAN ANGELO, TOM GREEN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS SAN ANGELO SYSTEM INTEGRITY
1490 080.79727 (30)
INSTALL 40 FEET OF 4 INCH, 10 FEET OF 2 INCH POLY AND ABANDON 40 FEET OF 4 INCH,
10 FEET OF 2 INCH STEEL ALONG THE STREETS OF CISCO IN CISCO, EASTLAND COUNTY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CISCO SYSTEM INTEGRITY
1491 080.79731 (2,624)
REPAIR LEAK ALONG LINE M NEAR ALVARADO, JOHNSON COUNTY IN ACCORDANCE WITH
THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALVARADO SYSTEM INTEGRITY
1492 080.79744 (3,609)
INSTALL 400 FEET OF 4 INCH, 100 FEET OF 6 INCH POLY AND ABANDON 400 FEET OF 3
INCH, 100 FEET OF 6 INCH STEEL IN ALLEY SOUTH OF 6TH AT ELBERT STREET IN QUANAH,
HARDEMAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS QUANAH SYSTEM INTEGRITY
1493 080.79781 (1,737)
INSTALL 20 FEET OF 4 INCH, 170 FEET OF 2 INCH POLY AND ABANDON 20 FEET OF 4 INCH
AND 170 FEET OF 2 INCH STEEL ALONG THE STREETS OF DE LEON, COMANCHE COUNTY
IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DE LEON SYSTEM INTEGRITY
1494 080.79846 (23,903)
INSTALL DISTRICT REGLATOR STATION DRS38, NEW REGULATOR AND RELIEF VALVE,
AND 25 FEET OF 2 INCH, 25 FEET OF 4 INCH POLY AND ABANDON DISTRICT REGULATOR
STATION DRS38 AT INTERSECTION OF GURLEY AVENUE AND SOUTH 21ST STREET IN
WACO, MCCLENNAN COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY
1495 080.79879 (11,173) PROCEEDS OF SALE OF 2 ACRES IN COLEMAN, COLEMAN COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES
1496 080.79901 (400)
INSTALL 5 FEET OF 2 INCH POLY AND ABANDON 5 FEET OF 2 INCH POLY ALONG SOUTH
MAIN STREET IN RHOME, WISE COUNTY IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RHOME SYSTEM INTEGRITY
1497 080.79930 (3,283,011)
PROCEEDS OF 9.792 ACRES (CONSISTING OF A 7.692 ACRE TRACT KNOWN LOCALLY AS
100 W. MORNINGSIDE DRIVE) AND A 2.10 ACRE TRACT (KNOWN LOCALLY AS 401 PAGE
STREET) SITUATED IN FORT WORTH, TARRANT COUNTY. ALL CUSTOMERS SYSTEM WIDE STRUCTURES
1498 080.79938 (26,264)
INSTALL 10 INCH SPLIT SLEEVE ALONG GOODWIN AT DELMAR IN DALLAS, DALLAS
COUNTY AND ABANDON SERVICE TAP IN ACCORDANCE WITH THE RAILROAD
COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS SYSTEM INTEGRITY
1499 080.80084 (161)
INSTALL 50 FEET OF 2 INCH POLY AND ABANDON 40 FEET OF 2 INCH POLY ALONG JOHN
KENNEDY AT LEATHERHEAD IN SAGINAW, TARRANT COUNTY IN ACCORDANCE WITH THE
RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW SYSTEM INTEGRITY
1500 080.80147 (1,473)
ABANDON 350 FEET OF 6 INCH STEEL ALONG CENTERVILLE AND O'BANION IN GARLAND,
DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY
1501 080.80169 (7)
INSTALL 5 FEET OF 2 INCH POLY AND ABANDON 5 FEET OF 2 INCH POLY ALONG HOUSTON
STREET IN TERRELL, KAUFMAN COUNTY. ALL CUSTOMERS TERRELL SYSTEM INTEGRITY
1502 080.80448 (5,516)
INSTALL ONE (1) AC UNIT IN ABILENE SERVICE CENTER IN ABILENE, TAYLOR COUNTY AND
ABANDON ONE (1) AC UNIT IN ABILENE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES
1503 ADMIN 080 (6,937,233) RETIREMENT OF STRUCTURES AND IMPROVEMENTS. ALL CUSTOMERS SYSTEM WIDE RETIREMENTS AND ADJUSTMENTS
1504 ADMIN 080 370,659 RETIREMENT OF STRUCTURES AND IMPROVEMENTS. ALL CUSTOMERS SYSTEM WIDE RETIREMENTS AND ADJUSTMENTS
1505 OTHER (249,636) RECORDED RETIREMENTS PENDING CLOSING PROJECT DETAIL. ALL CUSTOMERS SYSTEM WIDE RETIREMENTS AND ADJUSTMENTS
MTX Retirements
Page 44 of 45
544
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1) DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022 (2)
CUSTOMERS
BENEFITED LOCATION PURPOSE OF PROJECT
1506
TOTAL MTX
RETIREMENTS
(LN. 1 - LN. 1505) (86,216,397)
1507
1508
TOTAL CHANGE IN
MTX UTILITY
PLANT PER BOOK
(LN. 1506 +
MTX ADDITIONS
LN. 6299) (3) 977,630,154
1509
1510
1511 NOTES:
1512 (1) The "COST" column reflects the capitalized portion of the cost only.
1513 (2) The "DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CALENDAR YEAR 2022" column describes capitalized costs only.
1514 (3) This amount represents per book and does not include net plant adjustments.
MTX Retirements
Page 45 of 45
545
Item 10.
ATMOS ENERGY CORP.,
MID-TEX DIVISION
INTERIM RATE ADJUSTMENT
APPLICATION
PROJECT REPORT 2022
RETIREMENTS
BY FERC ACCOUNT
546
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.49148 37601 (117,871)
080 190 - Mid-Tex Gas Division Retirement 080.52108 37601 (13,995)
080 190 - Mid-Tex Gas Division Retirement 080.52108 37602 (8,427)
080 190 - Mid-Tex Gas Division Retirement 080.52108 38000 (8,959)
080 190 - Mid-Tex Gas Division Retirement 080.54137 37601 (146)
080 190 - Mid-Tex Gas Division Retirement 080.56871 37602 136
080 190 - Mid-Tex Gas Division Retirement 080.58753 38000 (3,200)
080 190 - Mid-Tex Gas Division Retirement 080.60447 37601 (1,934)
080 190 - Mid-Tex Gas Division Retirement 080.60447 37602 (13,707)
080 190 - Mid-Tex Gas Division Retirement 080.60447 38000 (1,670)
080 190 - Mid-Tex Gas Division Retirement 080.61247 38000 (17,437)
080 190 - Mid-Tex Gas Division Retirement 080.61594 37601 (637,972)
080 190 - Mid-Tex Gas Division Retirement 080.61594 37602 (234,375)
080 190 - Mid-Tex Gas Division Retirement 080.61594 38000 (3,052,020)
080 190 - Mid-Tex Gas Division Retirement 080.61595 37601 (121,356)
080 190 - Mid-Tex Gas Division Retirement 080.61595 37602 (279,038)
080 190 - Mid-Tex Gas Division Retirement 080.61595 38000 (51,525)
080 190 - Mid-Tex Gas Division Retirement 080.62093 37601 8
080 190 - Mid-Tex Gas Division Retirement 080.62093 37602 506
080 190 - Mid-Tex Gas Division Retirement 080.62714 37601 20,649
080 190 - Mid-Tex Gas Division Retirement 080.62714 37602 10,205
080 190 - Mid-Tex Gas Division Retirement 080.62738 37601 (433,540)
080 190 - Mid-Tex Gas Division Retirement 080.62738 37602 (39,074)
080 190 - Mid-Tex Gas Division Retirement 080.62738 38000 (4,857)
080 190 - Mid-Tex Gas Division Retirement 080.63644 37601 (100,921)
080 190 - Mid-Tex Gas Division Retirement 080.63945 37601 (7,567)
080 190 - Mid-Tex Gas Division Retirement 080.63945 37602 (51)
080 190 - Mid-Tex Gas Division Retirement 080.63945 37800 (36,781)
080 190 - Mid-Tex Gas Division Retirement 080.63945 38000 (497)
080 190 - Mid-Tex Gas Division Retirement 080.64366 38000 1,302
080 190 - Mid-Tex Gas Division Retirement 080.64399 37602 (4,765)
080 190 - Mid-Tex Gas Division Retirement 080.64399 38000 (2,358)
080 190 - Mid-Tex Gas Division Retirement 080.65103 37601 (430,261)
080 190 - Mid-Tex Gas Division Retirement 080.65103 37602 (1,867)
080 190 - Mid-Tex Gas Division Retirement 080.65103 37800 (205,653)
080 190 - Mid-Tex Gas Division Retirement 080.65103 38500 3,358
080 190 - Mid-Tex Gas Division Retirement 080.65275 38000 1,827
080 190 - Mid-Tex Gas Division Retirement 080.65516 37601 123
080 190 - Mid-Tex Gas Division Retirement 080.65516 37602 (1,099)
080 190 - Mid-Tex Gas Division Retirement 080.65651 37601 10
080 190 - Mid-Tex Gas Division Retirement 080.65651 37602 (308)
080 190 - Mid-Tex Gas Division Retirement 080.65674 37601 (27)
080 190 - Mid-Tex Gas Division Retirement 080.65674 37602 (177)
080 190 - Mid-Tex Gas Division Retirement 080.65674 37800 (22,352)
080 190 - Mid-Tex Gas Division Retirement 080.65697 37601 (10)
080 190 - Mid-Tex Gas Division Retirement 080.65704 37601 (194)
080 190 - Mid-Tex Gas Division Retirement 080.65704 37602 (102)
080 190 - Mid-Tex Gas Division Retirement 080.65704 37800 (1,603)
080 190 - Mid-Tex Gas Division Retirement 080.65704 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.65744 37601 (37,371)
080 190 - Mid-Tex Gas Division Retirement 080.65744 37602 (1,688)
080 190 - Mid-Tex Gas Division Retirement 080.65744 37800 (107,569)
080 190 - Mid-Tex Gas Division Retirement 080.65795 37601 (693)
080 190 - Mid-Tex Gas Division Retirement 080.65795 37602 (602)
080 190 - Mid-Tex Gas Division Retirement 080.65795 38000 (2,145)
080 190 - Mid-Tex Gas Division Retirement 080.65805 37601 (111)
080 190 - Mid-Tex Gas Division Retirement 080.65805 37602 (152)
080 190 - Mid-Tex Gas Division Retirement 080.65805 37800 (16,076)
080 190 - Mid-Tex Gas Division Retirement 080.65807 37601 528
080 190 - Mid-Tex Gas Division Retirement 080.65807 37602 155
080 190 - Mid-Tex Gas Division Retirement 080.65821 37601 (257)
080 190 - Mid-Tex Gas Division Retirement 080.65821 37602 (414)
080 190 - Mid-Tex Gas Division Retirement 080.65821 37800 (2,345)
080 190 - Mid-Tex Gas Division Retirement 080.65842 37800 (10,436)
080 190 - Mid-Tex Gas Division Retirement 080.65858 37601 (11,056)
080 190 - Mid-Tex Gas Division Retirement 080.65858 37602 (29,874)
080 190 - Mid-Tex Gas Division Retirement 080.65858 37800 (6,584)
080 190 - Mid-Tex Gas Division Retirement 080.65862 37601 (459)
080 190 - Mid-Tex Gas Division Retirement 080.65862 37602 (7,410)
080 190 - Mid-Tex Gas Division Retirement 080.65862 37800 (8,970)
080 190 - Mid-Tex Gas Division Retirement 080.65865 37601 (768)
080 190 - Mid-Tex Gas Division Retirement 080.65865 37602 (141)
080 190 - Mid-Tex Gas Division Retirement 080.65865 37800 (1,175)
080 190 - Mid-Tex Gas Division Retirement 080.65879 37601 12,705
080 190 - Mid-Tex Gas Division Retirement 080.65879 37602 (198)
080 190 - Mid-Tex Gas Division Retirement 080.65879 38000 371
080 190 - Mid-Tex Gas Division Retirement 080.66044 37601 (102,301)
080 190 - Mid-Tex Gas Division Retirement 080.66262 37601 (2,303)
080 190 - Mid-Tex Gas Division Retirement 080.66262 37602 (1,845)
080 190 - Mid-Tex Gas Division Retirement 080.66262 38000 (89)
080 190 - Mid-Tex Gas Division Retirement 080.66557 37601 (6,011)
080 190 - Mid-Tex Gas Division Retirement 080.66564 38000 (793)
080 190 - Mid-Tex Gas Division Retirement 080.66654 37601 (9,251)
080 190 - Mid-Tex Gas Division Retirement 080.66654 38000 (310)
080 190 - Mid-Tex Gas Division Retirement 080.66666 37601 (5,532,859)
080 190 - Mid-Tex Gas Division Retirement 080.66673 37601 (25)
080 190 - Mid-Tex Gas Division Retirement 080.66673 37602 (421)
080 190 - Mid-Tex Gas Division Retirement 080.66728 37601 86
080 190 - Mid-Tex Gas Division Retirement 080.66728 38000 (3,194)
080 190 - Mid-Tex Gas Division Retirement 080.66755 37601 17
080 190 - Mid-Tex Gas Division Retirement 080.66755 37602 (81)
080 190 - Mid-Tex Gas Division Retirement 080.66755 38000 (137)
080 190 - Mid-Tex Gas Division Retirement 080.66775 37601 1,724
080 190 - Mid-Tex Gas Division Retirement 080.66809 37601 (16,624)
080 190 - Mid-Tex Gas Division Retirement 080.67075 37602 (5,826)
080 190 - Mid-Tex Gas Division Retirement 080.67347 38000 (136)
080 190 - Mid-Tex Gas Division Retirement 080.67748 38000 (888)
080 190 - Mid-Tex Gas Division Retirement 080.67855 37602 (3,236)
080 190 - Mid-Tex Gas Division Retirement 080.68373 37601 (891)
080 190 - Mid-Tex Gas Division Retirement 080.68373 37602 (37,350)
080 190 - Mid-Tex Gas Division Retirement 080.68429 37601 628,735
080 190 - Mid-Tex Gas Division Retirement 080.68429 37602 10,316
080 190 - Mid-Tex Gas Division Retirement 080.68474 37601 76
080 190 - Mid-Tex Gas Division Retirement 080.68474 38000 (1,263)
080 190 - Mid-Tex Gas Division Retirement 080.68503 37601 (544)
080 190 - Mid-Tex Gas Division Retirement 080.68503 38000 (353)
080 190 - Mid-Tex Gas Division Retirement 080.68576 37601 (1,839)
MTX Retirements by FERC
Page 1 of 30
547
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.68954 37601 (23,690)
080 190 - Mid-Tex Gas Division Retirement 080.69221 37602 (89,805)
080 190 - Mid-Tex Gas Division Retirement 080.69221 38000 (450)
080 190 - Mid-Tex Gas Division Retirement 080.69341 37601 1,322
080 190 - Mid-Tex Gas Division Retirement 080.69341 37602 (6,234)
080 190 - Mid-Tex Gas Division Retirement 080.69341 38000 647
080 190 - Mid-Tex Gas Division Retirement 080.69404 37602 (338)
080 190 - Mid-Tex Gas Division Retirement 080.69404 38000 (665)
080 190 - Mid-Tex Gas Division Retirement 080.69414 37602 (450)
080 190 - Mid-Tex Gas Division Retirement 080.69414 38000 (1,405)
080 190 - Mid-Tex Gas Division Retirement 080.69599 38000 (51)
080 190 - Mid-Tex Gas Division Retirement 080.69629 37602 759
080 190 - Mid-Tex Gas Division Retirement 080.69719 38000 120
080 190 - Mid-Tex Gas Division Retirement 080.69878 37602 493
080 190 - Mid-Tex Gas Division Retirement 080.69932 37602 (531)
080 190 - Mid-Tex Gas Division Retirement 080.69932 38000 (252)
080 190 - Mid-Tex Gas Division Retirement 080.70046 37601 (1,945)
080 190 - Mid-Tex Gas Division Retirement 080.70046 38000 (11,026)
080 190 - Mid-Tex Gas Division Retirement 080.70161 37601 543
080 190 - Mid-Tex Gas Division Retirement 080.70161 37602 (1,079)
080 190 - Mid-Tex Gas Division Retirement 080.70193 37601 (5,349)
080 190 - Mid-Tex Gas Division Retirement 080.70193 37602 (82)
080 190 - Mid-Tex Gas Division Retirement 080.70194 37601 (157,930)
080 190 - Mid-Tex Gas Division Retirement 080.70194 37602 (4,085)
080 190 - Mid-Tex Gas Division Retirement 080.70195 37601 (484,003)
080 190 - Mid-Tex Gas Division Retirement 080.70195 37602 (8,462)
080 190 - Mid-Tex Gas Division Retirement 080.70196 37601 (63,479)
080 190 - Mid-Tex Gas Division Retirement 080.70196 37602 (7,986)
080 190 - Mid-Tex Gas Division Retirement 080.70197 37601 (594)
080 190 - Mid-Tex Gas Division Retirement 080.70197 37602 (1,677)
080 190 - Mid-Tex Gas Division Retirement 080.70198 37601 (493)
080 190 - Mid-Tex Gas Division Retirement 080.70199 37601 (1,435)
080 190 - Mid-Tex Gas Division Retirement 080.70199 37602 (172)
080 190 - Mid-Tex Gas Division Retirement 080.70200 37601 (1,473)
080 190 - Mid-Tex Gas Division Retirement 080.70200 37602 (472)
080 190 - Mid-Tex Gas Division Retirement 080.70201 37601 (41,020)
080 190 - Mid-Tex Gas Division Retirement 080.70201 37602 (2,283)
080 190 - Mid-Tex Gas Division Retirement 080.70202 38000 (55,398)
080 190 - Mid-Tex Gas Division Retirement 080.70203 38000 (195,109)
080 190 - Mid-Tex Gas Division Retirement 080.70204 38000 (138,106)
080 190 - Mid-Tex Gas Division Retirement 080.70205 38000 (37,376)
080 190 - Mid-Tex Gas Division Retirement 080.70206 38000 (48,162)
080 190 - Mid-Tex Gas Division Retirement 080.70207 38000 (4,691)
080 190 - Mid-Tex Gas Division Retirement 080.70208 38000 (23,295)
080 190 - Mid-Tex Gas Division Retirement 080.70209 38000 (4,599)
080 190 - Mid-Tex Gas Division Retirement 080.70210 38000 (134,626)
080 190 - Mid-Tex Gas Division Retirement 080.70211 37601 (462)
080 190 - Mid-Tex Gas Division Retirement 080.70211 37602 (2,094)
080 190 - Mid-Tex Gas Division Retirement 080.70212 37601 (53,724)
080 190 - Mid-Tex Gas Division Retirement 080.70212 37602 (6,087)
080 190 - Mid-Tex Gas Division Retirement 080.70213 37601 (17,224)
080 190 - Mid-Tex Gas Division Retirement 080.70213 37602 (1,170)
080 190 - Mid-Tex Gas Division Retirement 080.70214 37601 (3,030)
080 190 - Mid-Tex Gas Division Retirement 080.70214 37602 (11,255)
080 190 - Mid-Tex Gas Division Retirement 080.70215 37601 (34)
080 190 - Mid-Tex Gas Division Retirement 080.70215 37602 (189)
080 190 - Mid-Tex Gas Division Retirement 080.70216 37601 (110)
080 190 - Mid-Tex Gas Division Retirement 080.70216 37602 (87)
080 190 - Mid-Tex Gas Division Retirement 080.70217 37601 (107,746)
080 190 - Mid-Tex Gas Division Retirement 080.70217 37602 (3,324)
080 190 - Mid-Tex Gas Division Retirement 080.70218 37601 (39)
080 190 - Mid-Tex Gas Division Retirement 080.70218 37602 (1,493)
080 190 - Mid-Tex Gas Division Retirement 080.70219 37601 (32,905)
080 190 - Mid-Tex Gas Division Retirement 080.70219 37602 (844)
080 190 - Mid-Tex Gas Division Retirement 080.70220 38000 (150,221)
080 190 - Mid-Tex Gas Division Retirement 080.70221 38000 (110,564)
080 190 - Mid-Tex Gas Division Retirement 080.70222 38000 (196,314)
080 190 - Mid-Tex Gas Division Retirement 080.70223 38000 (562,015)
080 190 - Mid-Tex Gas Division Retirement 080.70224 38000 (180,808)
080 190 - Mid-Tex Gas Division Retirement 080.70225 38000 (47,411)
080 190 - Mid-Tex Gas Division Retirement 080.70226 38000 (180,865)
080 190 - Mid-Tex Gas Division Retirement 080.70227 38000 (73,608)
080 190 - Mid-Tex Gas Division Retirement 080.70228 38000 (137,189)
080 190 - Mid-Tex Gas Division Retirement 080.70229 38100 (850,133)
080 190 - Mid-Tex Gas Division Retirement 080.70229 38200 (461,221)
080 190 - Mid-Tex Gas Division Retirement 080.70229 38300 (257,705)
080 190 - Mid-Tex Gas Division Retirement 080.70230 38100 (1,451,175)
080 190 - Mid-Tex Gas Division Retirement 080.70230 38200 (443,784)
080 190 - Mid-Tex Gas Division Retirement 080.70230 38300 (249,183)
080 190 - Mid-Tex Gas Division Retirement 080.70231 38100 (631,797)
080 190 - Mid-Tex Gas Division Retirement 080.70231 38200 (317,150)
080 190 - Mid-Tex Gas Division Retirement 080.70231 38300 (186,244)
080 190 - Mid-Tex Gas Division Retirement 080.70232 38100 (1,720,560)
080 190 - Mid-Tex Gas Division Retirement 080.70232 38200 (595,539)
080 190 - Mid-Tex Gas Division Retirement 080.70232 38300 (351,655)
080 190 - Mid-Tex Gas Division Retirement 080.70233 38100 (1,741,565)
080 190 - Mid-Tex Gas Division Retirement 080.70233 38200 (512,139)
080 190 - Mid-Tex Gas Division Retirement 080.70233 38300 (283,865)
080 190 - Mid-Tex Gas Division Retirement 080.70234 38100 (455,510)
080 190 - Mid-Tex Gas Division Retirement 080.70234 38200 (283,499)
080 190 - Mid-Tex Gas Division Retirement 080.70234 38300 (141,351)
080 190 - Mid-Tex Gas Division Retirement 080.70235 38100 (642,367)
080 190 - Mid-Tex Gas Division Retirement 080.70235 38200 (324,752)
080 190 - Mid-Tex Gas Division Retirement 080.70235 38300 (180,102)
080 190 - Mid-Tex Gas Division Retirement 080.70236 38100 (486,066)
080 190 - Mid-Tex Gas Division Retirement 080.70236 38200 (242,931)
080 190 - Mid-Tex Gas Division Retirement 080.70236 38300 (131,420)
080 190 - Mid-Tex Gas Division Retirement 080.70237 38100 (593,248)
080 190 - Mid-Tex Gas Division Retirement 080.70237 38200 (317,444)
080 190 - Mid-Tex Gas Division Retirement 080.70237 38300 (192,307)
080 190 - Mid-Tex Gas Division Retirement 080.70252 37601 (251)
080 190 - Mid-Tex Gas Division Retirement 080.70252 38000 (749)
080 190 - Mid-Tex Gas Division Retirement 080.70260 37601 38
080 190 - Mid-Tex Gas Division Retirement 080.70260 37602 (648)
080 190 - Mid-Tex Gas Division Retirement 080.70307 38000 (81,264)
080 190 - Mid-Tex Gas Division Retirement 080.70308 38000 (68,160)
080 190 - Mid-Tex Gas Division Retirement 080.70309 38000 (93,308)
MTX Retirements by FERC
Page 2 of 30
548
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.70310 38000 (468,571)
080 190 - Mid-Tex Gas Division Retirement 080.70311 38000 (219,107)
080 190 - Mid-Tex Gas Division Retirement 080.70312 38000 (77,471)
080 190 - Mid-Tex Gas Division Retirement 080.70313 38000 (104,352)
080 190 - Mid-Tex Gas Division Retirement 080.70314 38000 (105,846)
080 190 - Mid-Tex Gas Division Retirement 080.70315 38000 (71,030)
080 190 - Mid-Tex Gas Division Retirement 080.70316 37601 (61)
080 190 - Mid-Tex Gas Division Retirement 080.70316 37602 (4,453)
080 190 - Mid-Tex Gas Division Retirement 080.70317 37601 (687)
080 190 - Mid-Tex Gas Division Retirement 080.70317 37602 (9,108)
080 190 - Mid-Tex Gas Division Retirement 080.70318 37601 (367)
080 190 - Mid-Tex Gas Division Retirement 080.70318 37602 (9,504)
080 190 - Mid-Tex Gas Division Retirement 080.70319 37601 (301)
080 190 - Mid-Tex Gas Division Retirement 080.70319 37602 (6,340)
080 190 - Mid-Tex Gas Division Retirement 080.70320 37602 (9,306)
080 190 - Mid-Tex Gas Division Retirement 080.70321 37601 (125)
080 190 - Mid-Tex Gas Division Retirement 080.70321 37602 (1,037)
080 190 - Mid-Tex Gas Division Retirement 080.70322 37601 (57)
080 190 - Mid-Tex Gas Division Retirement 080.70322 37602 (5,539)
080 190 - Mid-Tex Gas Division Retirement 080.70323 37602 (3,902)
080 190 - Mid-Tex Gas Division Retirement 080.70324 37601 (115)
080 190 - Mid-Tex Gas Division Retirement 080.70324 37602 (2,301)
080 190 - Mid-Tex Gas Division Retirement 080.70325 38100 (158,285)
080 190 - Mid-Tex Gas Division Retirement 080.70325 38200 (83,064)
080 190 - Mid-Tex Gas Division Retirement 080.70325 38300 (39,266)
080 190 - Mid-Tex Gas Division Retirement 080.70326 38100 (257,092)
080 190 - Mid-Tex Gas Division Retirement 080.70326 38200 (84,111)
080 190 - Mid-Tex Gas Division Retirement 080.70326 38300 (38,028)
080 190 - Mid-Tex Gas Division Retirement 080.70327 38100 (215,103)
080 190 - Mid-Tex Gas Division Retirement 080.70327 38200 (93,835)
080 190 - Mid-Tex Gas Division Retirement 080.70327 38300 (53,740)
080 190 - Mid-Tex Gas Division Retirement 080.70328 38100 (362,829)
080 190 - Mid-Tex Gas Division Retirement 080.70328 38200 (127,613)
080 190 - Mid-Tex Gas Division Retirement 080.70328 38300 (75,342)
080 190 - Mid-Tex Gas Division Retirement 080.70329 38100 (576,240)
080 190 - Mid-Tex Gas Division Retirement 080.70329 38200 (170,381)
080 190 - Mid-Tex Gas Division Retirement 080.70329 38300 (95,503)
080 190 - Mid-Tex Gas Division Retirement 080.70330 38100 (81,827)
080 190 - Mid-Tex Gas Division Retirement 080.70330 38200 (49,149)
080 190 - Mid-Tex Gas Division Retirement 080.70330 38300 (27,611)
080 190 - Mid-Tex Gas Division Retirement 080.70331 38100 (207,599)
080 190 - Mid-Tex Gas Division Retirement 080.70331 38200 (123,485)
080 190 - Mid-Tex Gas Division Retirement 080.70331 38300 (55,320)
080 190 - Mid-Tex Gas Division Retirement 080.70332 38100 (168,318)
080 190 - Mid-Tex Gas Division Retirement 080.70332 38200 (87,688)
080 190 - Mid-Tex Gas Division Retirement 080.70332 38300 (51,913)
080 190 - Mid-Tex Gas Division Retirement 080.70333 38100 (230,303)
080 190 - Mid-Tex Gas Division Retirement 080.70333 38200 (131,359)
080 190 - Mid-Tex Gas Division Retirement 080.70333 38300 (79,048)
080 190 - Mid-Tex Gas Division Retirement 080.70515 37601 137
080 190 - Mid-Tex Gas Division Retirement 080.70515 37602 (278)
080 190 - Mid-Tex Gas Division Retirement 080.70515 38000 2,615
080 190 - Mid-Tex Gas Division Retirement 080.70526 38000 (72)
080 190 - Mid-Tex Gas Division Retirement 080.70527 37601 (7)
080 190 - Mid-Tex Gas Division Retirement 080.70527 37602 43
080 190 - Mid-Tex Gas Division Retirement 080.70534 37601 (17)
080 190 - Mid-Tex Gas Division Retirement 080.70534 37602 (216)
080 190 - Mid-Tex Gas Division Retirement 080.70534 38000 (23)
080 190 - Mid-Tex Gas Division Retirement 080.70540 37601 (7)
080 190 - Mid-Tex Gas Division Retirement 080.70540 38000 (256)
080 190 - Mid-Tex Gas Division Retirement 080.70541 37601 (37)
080 190 - Mid-Tex Gas Division Retirement 080.70541 38000 200
080 190 - Mid-Tex Gas Division Retirement 080.70545 37601 (81)
080 190 - Mid-Tex Gas Division Retirement 080.70545 38000 (280)
080 190 - Mid-Tex Gas Division Retirement 080.70548 37601 1,470
080 190 - Mid-Tex Gas Division Retirement 080.70548 37602 12
080 190 - Mid-Tex Gas Division Retirement 080.70548 38000 1,731
080 190 - Mid-Tex Gas Division Retirement 080.70551 37601 (6,349)
080 190 - Mid-Tex Gas Division Retirement 080.70551 37602 (1,879)
080 190 - Mid-Tex Gas Division Retirement 080.70551 38000 483
080 190 - Mid-Tex Gas Division Retirement 080.70552 37601 (3,755)
080 190 - Mid-Tex Gas Division Retirement 080.70552 38000 129
080 190 - Mid-Tex Gas Division Retirement 080.70553 37601 (1,342)
080 190 - Mid-Tex Gas Division Retirement 080.70553 38000 (140)
080 190 - Mid-Tex Gas Division Retirement 080.70554 37601 (28)
080 190 - Mid-Tex Gas Division Retirement 080.70554 38000 (74)
080 190 - Mid-Tex Gas Division Retirement 080.70555 37601 54
080 190 - Mid-Tex Gas Division Retirement 080.70555 38000 (103)
080 190 - Mid-Tex Gas Division Retirement 080.70564 38000 413
080 190 - Mid-Tex Gas Division Retirement 080.70606 37601 (4,621)
080 190 - Mid-Tex Gas Division Retirement 080.70606 37602 (1,309)
080 190 - Mid-Tex Gas Division Retirement 080.70606 38000 (723)
080 190 - Mid-Tex Gas Division Retirement 080.70611 37601 (195)
080 190 - Mid-Tex Gas Division Retirement 080.70611 37602 (7,512)
080 190 - Mid-Tex Gas Division Retirement 080.70611 37800 (794)
080 190 - Mid-Tex Gas Division Retirement 080.70618 37601 (74)
080 190 - Mid-Tex Gas Division Retirement 080.70618 37602 (5,728)
080 190 - Mid-Tex Gas Division Retirement 080.70618 37800 (24,761)
080 190 - Mid-Tex Gas Division Retirement 080.70618 38000 (312)
080 190 - Mid-Tex Gas Division Retirement 080.70619 37601 (2,853)
080 190 - Mid-Tex Gas Division Retirement 080.70619 37602 (1,580)
080 190 - Mid-Tex Gas Division Retirement 080.70619 37800 (1,630)
080 190 - Mid-Tex Gas Division Retirement 080.70619 38000 (686)
080 190 - Mid-Tex Gas Division Retirement 080.70620 37601 (869)
080 190 - Mid-Tex Gas Division Retirement 080.70620 37602 (94)
080 190 - Mid-Tex Gas Division Retirement 080.70620 37800 (9,303)
080 190 - Mid-Tex Gas Division Retirement 080.70620 38000 (195)
080 190 - Mid-Tex Gas Division Retirement 080.70643 37601 (100)
080 190 - Mid-Tex Gas Division Retirement 080.70643 37800 (65,942)
080 190 - Mid-Tex Gas Division Retirement 080.70644 37601 (2,037)
080 190 - Mid-Tex Gas Division Retirement 080.70644 38000 (23,450)
080 190 - Mid-Tex Gas Division Retirement 080.70686 37601 (31,370)
080 190 - Mid-Tex Gas Division Retirement 080.70686 37602 (3,260)
080 190 - Mid-Tex Gas Division Retirement 080.70702 38000 355
080 190 - Mid-Tex Gas Division Retirement 080.70706 37601 40
080 190 - Mid-Tex Gas Division Retirement 080.70706 37602 (1,568)
080 190 - Mid-Tex Gas Division Retirement 080.70735 37601 (146)
MTX Retirements by FERC
Page 3 of 30
549
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.70810 37601 (664)
080 190 - Mid-Tex Gas Division Retirement 080.70810 37602 6,420
080 190 - Mid-Tex Gas Division Retirement 080.70810 38000 (17,850)
080 190 - Mid-Tex Gas Division Retirement 080.70840 38000 303
080 190 - Mid-Tex Gas Division Retirement 080.70855 38000 (1,087)
080 190 - Mid-Tex Gas Division Retirement 080.70903 37602 (205)
080 190 - Mid-Tex Gas Division Retirement 080.70936 37601 (48)
080 190 - Mid-Tex Gas Division Retirement 080.70936 37602 (1,408)
080 190 - Mid-Tex Gas Division Retirement 080.70954 37601 123
080 190 - Mid-Tex Gas Division Retirement 080.71018 38000 1,101
080 190 - Mid-Tex Gas Division Retirement 080.71021 38000 700
080 190 - Mid-Tex Gas Division Retirement 080.71031 37601 (581)
080 190 - Mid-Tex Gas Division Retirement 080.71031 38000 (1,974)
080 190 - Mid-Tex Gas Division Retirement 080.71033 37602 568
080 190 - Mid-Tex Gas Division Retirement 080.71033 38000 (5,731)
080 190 - Mid-Tex Gas Division Retirement 080.71043 37601 (7,638)
080 190 - Mid-Tex Gas Division Retirement 080.71107 37601 21
080 190 - Mid-Tex Gas Division Retirement 080.71126 38000 (8,450)
080 190 - Mid-Tex Gas Division Retirement 080.71129 37601 3,474
080 190 - Mid-Tex Gas Division Retirement 080.71129 37602 308
080 190 - Mid-Tex Gas Division Retirement 080.71129 38000 (2,940)
080 190 - Mid-Tex Gas Division Retirement 080.71130 37602 (1,739)
080 190 - Mid-Tex Gas Division Retirement 080.71168 37602 (261)
080 190 - Mid-Tex Gas Division Retirement 080.71174 37602 (5,520)
080 190 - Mid-Tex Gas Division Retirement 080.71177 37601 (12,255)
080 190 - Mid-Tex Gas Division Retirement 080.71177 37602 (161,424)
080 190 - Mid-Tex Gas Division Retirement 080.71177 38000 (5,869)
080 190 - Mid-Tex Gas Division Retirement 080.71224 37601 59
080 190 - Mid-Tex Gas Division Retirement 080.71224 37602 420
080 190 - Mid-Tex Gas Division Retirement 080.71224 38000 (169)
080 190 - Mid-Tex Gas Division Retirement 080.71255 37601 (2,839,533)
080 190 - Mid-Tex Gas Division Retirement 080.71294 38000 (200)
080 190 - Mid-Tex Gas Division Retirement 080.71302 38000 781
080 190 - Mid-Tex Gas Division Retirement 080.71303 38000 732
080 190 - Mid-Tex Gas Division Retirement 080.71304 37602 (113,418)
080 190 - Mid-Tex Gas Division Retirement 080.71368 38000 (1,955)
080 190 - Mid-Tex Gas Division Retirement 080.71369 37601 (406)
080 190 - Mid-Tex Gas Division Retirement 080.71369 38000 (85)
080 190 - Mid-Tex Gas Division Retirement 080.71387 37601 (13,079)
080 190 - Mid-Tex Gas Division Retirement 080.71387 37602 (2,884)
080 190 - Mid-Tex Gas Division Retirement 080.71387 38000 (10,363)
080 190 - Mid-Tex Gas Division Retirement 080.71412 37602 30,074
080 190 - Mid-Tex Gas Division Retirement 080.71412 38000 548
080 190 - Mid-Tex Gas Division Retirement 080.71429 37602 (9,609)
080 190 - Mid-Tex Gas Division Retirement 080.71467 37601 (8,060)
080 190 - Mid-Tex Gas Division Retirement 080.71467 37602 (13,761)
080 190 - Mid-Tex Gas Division Retirement 080.71467 37800 (29,350)
080 190 - Mid-Tex Gas Division Retirement 080.71467 38000 (2,954)
080 190 - Mid-Tex Gas Division Retirement 080.71517 37601 (2,490)
080 190 - Mid-Tex Gas Division Retirement 080.71517 37602 4,419
080 190 - Mid-Tex Gas Division Retirement 080.71517 38000 (1,862)
080 190 - Mid-Tex Gas Division Retirement 080.71522 37601 (2,966)
080 190 - Mid-Tex Gas Division Retirement 080.71522 37602 (7,791)
080 190 - Mid-Tex Gas Division Retirement 080.71522 37800 (39,456)
080 190 - Mid-Tex Gas Division Retirement 080.71528 38000 (188)
080 190 - Mid-Tex Gas Division Retirement 080.71531 37800 (4,647)
080 190 - Mid-Tex Gas Division Retirement 080.71532 37800 (75,197)
080 190 - Mid-Tex Gas Division Retirement 080.71534 38000 (2,461)
080 190 - Mid-Tex Gas Division Retirement 080.71567 37601 (6,301)
080 190 - Mid-Tex Gas Division Retirement 080.71592 37601 (112)
080 190 - Mid-Tex Gas Division Retirement 080.71592 38000 6,624
080 190 - Mid-Tex Gas Division Retirement 080.71607 38000 3,099
080 190 - Mid-Tex Gas Division Retirement 080.71647 38000 562
080 190 - Mid-Tex Gas Division Retirement 080.71648 37601 70
080 190 - Mid-Tex Gas Division Retirement 080.71648 37602 1,548
080 190 - Mid-Tex Gas Division Retirement 080.71648 38000 236
080 190 - Mid-Tex Gas Division Retirement 080.71703 37601 (1,727)
080 190 - Mid-Tex Gas Division Retirement 080.71703 37602 (187)
080 190 - Mid-Tex Gas Division Retirement 080.71703 38000 (1,810)
080 190 - Mid-Tex Gas Division Retirement 080.71710 37601 5,127
080 190 - Mid-Tex Gas Division Retirement 080.71710 37602 (140)
080 190 - Mid-Tex Gas Division Retirement 080.71710 38000 552
080 190 - Mid-Tex Gas Division Retirement 080.71716 37601 (15,592)
080 190 - Mid-Tex Gas Division Retirement 080.71716 37602 (3,404)
080 190 - Mid-Tex Gas Division Retirement 080.71716 37800 (1,434)
080 190 - Mid-Tex Gas Division Retirement 080.71716 38000 (15,714)
080 190 - Mid-Tex Gas Division Retirement 080.71738 37601 73,206
080 190 - Mid-Tex Gas Division Retirement 080.71738 37602 (172)
080 190 - Mid-Tex Gas Division Retirement 080.71738 38000 (71,940)
080 190 - Mid-Tex Gas Division Retirement 080.71760 37601 (47,793)
080 190 - Mid-Tex Gas Division Retirement 080.71760 37602 (1,157)
080 190 - Mid-Tex Gas Division Retirement 080.71760 38000 (2,849)
080 190 - Mid-Tex Gas Division Retirement 080.71773 37601 (6,035)
080 190 - Mid-Tex Gas Division Retirement 080.71773 37602 (7,554)
080 190 - Mid-Tex Gas Division Retirement 080.71773 38000 (24,213)
080 190 - Mid-Tex Gas Division Retirement 080.71805 37601 (1,378)
080 190 - Mid-Tex Gas Division Retirement 080.71805 37602 (3,561)
080 190 - Mid-Tex Gas Division Retirement 080.71805 38000 (2,793)
080 190 - Mid-Tex Gas Division Retirement 080.71832 37601 (2,961)
080 190 - Mid-Tex Gas Division Retirement 080.71832 37602 (79,872)
080 190 - Mid-Tex Gas Division Retirement 080.71832 38000 (1,082)
080 190 - Mid-Tex Gas Division Retirement 080.71838 37602 20
080 190 - Mid-Tex Gas Division Retirement 080.71839 37601 (94,150)
080 190 - Mid-Tex Gas Division Retirement 080.71839 37602 (217,235)
080 190 - Mid-Tex Gas Division Retirement 080.71839 37800 (84,611)
080 190 - Mid-Tex Gas Division Retirement 080.71839 38000 (5,734)
080 190 - Mid-Tex Gas Division Retirement 080.71850 37601 (27)
080 190 - Mid-Tex Gas Division Retirement 080.71856 37601 (3,106)
080 190 - Mid-Tex Gas Division Retirement 080.71856 37602 (13)
080 190 - Mid-Tex Gas Division Retirement 080.71856 38000 (484)
080 190 - Mid-Tex Gas Division Retirement 080.71884 37601 (937)
080 190 - Mid-Tex Gas Division Retirement 080.71884 37602 (1,450)
080 190 - Mid-Tex Gas Division Retirement 080.71884 37800 (683)
080 190 - Mid-Tex Gas Division Retirement 080.71884 38000 (850)
080 190 - Mid-Tex Gas Division Retirement 080.71892 37601 (974,020)
080 190 - Mid-Tex Gas Division Retirement 080.71894 37601 (19,897)
080 190 - Mid-Tex Gas Division Retirement 080.71894 37602 (15,058)
MTX Retirements by FERC
Page 4 of 30
550
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.71894 38000 (11,402)
080 190 - Mid-Tex Gas Division Retirement 080.71907 37601 (81,744)
080 190 - Mid-Tex Gas Division Retirement 080.71909 37601 (142,060)
080 190 - Mid-Tex Gas Division Retirement 080.71910 37601 (85,782)
080 190 - Mid-Tex Gas Division Retirement 080.71921 37601 (672)
080 190 - Mid-Tex Gas Division Retirement 080.71921 37602 (1,118)
080 190 - Mid-Tex Gas Division Retirement 080.71921 38000 625
080 190 - Mid-Tex Gas Division Retirement 080.71948 37601 (1,604)
080 190 - Mid-Tex Gas Division Retirement 080.71948 38000 (19,928)
080 190 - Mid-Tex Gas Division Retirement 080.71951 37601 (31)
080 190 - Mid-Tex Gas Division Retirement 080.71954 37602 (593)
080 190 - Mid-Tex Gas Division Retirement 080.71956 37601 (576)
080 190 - Mid-Tex Gas Division Retirement 080.71956 37602 (3,042)
080 190 - Mid-Tex Gas Division Retirement 080.71956 38000 (10,899)
080 190 - Mid-Tex Gas Division Retirement 080.71960 37601 (53)
080 190 - Mid-Tex Gas Division Retirement 080.71962 37601 (506)
080 190 - Mid-Tex Gas Division Retirement 080.71962 37602 796
080 190 - Mid-Tex Gas Division Retirement 080.71962 38000 2,238
080 190 - Mid-Tex Gas Division Retirement 080.71969 37601 (16,573)
080 190 - Mid-Tex Gas Division Retirement 080.71975 37601 31
080 190 - Mid-Tex Gas Division Retirement 080.71982 37602 (13,437)
080 190 - Mid-Tex Gas Division Retirement 080.71993 37601 (384)
080 190 - Mid-Tex Gas Division Retirement 080.71999 37602 (58,544)
080 190 - Mid-Tex Gas Division Retirement 080.71999 38000 (37,446)
080 190 - Mid-Tex Gas Division Retirement 080.72011 37602 343
080 190 - Mid-Tex Gas Division Retirement 080.72011 38000 303
080 190 - Mid-Tex Gas Division Retirement 080.72012 37601 (309)
080 190 - Mid-Tex Gas Division Retirement 080.72035 37601 (37)
080 190 - Mid-Tex Gas Division Retirement 080.72035 38000 (1,146)
080 190 - Mid-Tex Gas Division Retirement 080.72036 37601 (325)
080 190 - Mid-Tex Gas Division Retirement 080.72036 37602 199
080 190 - Mid-Tex Gas Division Retirement 080.72036 38000 (2,909)
080 190 - Mid-Tex Gas Division Retirement 080.72039 37601 7,783
080 190 - Mid-Tex Gas Division Retirement 080.72039 37602 (20,919)
080 190 - Mid-Tex Gas Division Retirement 080.72039 38000 4,445
080 190 - Mid-Tex Gas Division Retirement 080.72045 37601 (708)
080 190 - Mid-Tex Gas Division Retirement 080.72075 37601 (104,142)
080 190 - Mid-Tex Gas Division Retirement 080.72082 37602 (1,259)
080 190 - Mid-Tex Gas Division Retirement 080.72085 37601 (30,820)
080 190 - Mid-Tex Gas Division Retirement 080.72085 37602 (26)
080 190 - Mid-Tex Gas Division Retirement 080.72085 38000 (81,390)
080 190 - Mid-Tex Gas Division Retirement 080.72099 37602 (8,948)
080 190 - Mid-Tex Gas Division Retirement 080.72122 37601 443
080 190 - Mid-Tex Gas Division Retirement 080.72122 37602 4,267
080 190 - Mid-Tex Gas Division Retirement 080.72122 38000 (1,385)
080 190 - Mid-Tex Gas Division Retirement 080.72199 38000 1,524
080 190 - Mid-Tex Gas Division Retirement 080.72203 37602 187
080 190 - Mid-Tex Gas Division Retirement 080.72203 38000 421
080 190 - Mid-Tex Gas Division Retirement 080.72211 38900 (3,038)
080 190 - Mid-Tex Gas Division Retirement 080.72211 39000 (292,508)
080 190 - Mid-Tex Gas Division Retirement 080.72217 37601 (32)
080 190 - Mid-Tex Gas Division Retirement 080.72223 37601 (9,087)
080 190 - Mid-Tex Gas Division Retirement 080.72223 37602 (527)
080 190 - Mid-Tex Gas Division Retirement 080.72239 37602 208
080 190 - Mid-Tex Gas Division Retirement 080.72266 37601 (79,239)
080 190 - Mid-Tex Gas Division Retirement 080.72266 38000 5
080 190 - Mid-Tex Gas Division Retirement 080.72270 37602 (6,536)
080 190 - Mid-Tex Gas Division Retirement 080.72270 38000 (14,006)
080 190 - Mid-Tex Gas Division Retirement 080.72275 37601 (27)
080 190 - Mid-Tex Gas Division Retirement 080.72275 37602 299
080 190 - Mid-Tex Gas Division Retirement 080.72275 38000 2,436
080 190 - Mid-Tex Gas Division Retirement 080.72278 38000 (1,138)
080 190 - Mid-Tex Gas Division Retirement 080.72292 37602 (13)
080 190 - Mid-Tex Gas Division Retirement 080.72292 38000 4,593
080 190 - Mid-Tex Gas Division Retirement 080.72294 37602 6,482
080 190 - Mid-Tex Gas Division Retirement 080.72300 37601 1,168
080 190 - Mid-Tex Gas Division Retirement 080.72300 37602 9
080 190 - Mid-Tex Gas Division Retirement 080.72300 37800 742
080 190 - Mid-Tex Gas Division Retirement 080.72300 38000 6,582
080 190 - Mid-Tex Gas Division Retirement 080.72308 37602 539
080 190 - Mid-Tex Gas Division Retirement 080.72310 38000 (237)
080 190 - Mid-Tex Gas Division Retirement 080.72321 37601 (116)
080 190 - Mid-Tex Gas Division Retirement 080.72321 37602 210
080 190 - Mid-Tex Gas Division Retirement 080.72321 38000 291
080 190 - Mid-Tex Gas Division Retirement 080.72322 37601 (132)
080 190 - Mid-Tex Gas Division Retirement 080.72322 38000 804
080 190 - Mid-Tex Gas Division Retirement 080.72324 37602 (353,997)
080 190 - Mid-Tex Gas Division Retirement 080.72347 37602 (39,039)
080 190 - Mid-Tex Gas Division Retirement 080.72347 38000 (10)
080 190 - Mid-Tex Gas Division Retirement 080.72348 37601 11
080 190 - Mid-Tex Gas Division Retirement 080.72348 37602 (194)
080 190 - Mid-Tex Gas Division Retirement 080.72367 37602 (1,401)
080 190 - Mid-Tex Gas Division Retirement 080.72367 38000 320
080 190 - Mid-Tex Gas Division Retirement 080.72369 37602 23
080 190 - Mid-Tex Gas Division Retirement 080.72369 38000 562
080 190 - Mid-Tex Gas Division Retirement 080.72372 37601 (2,085)
080 190 - Mid-Tex Gas Division Retirement 080.72372 37602 (541)
080 190 - Mid-Tex Gas Division Retirement 080.72372 38000 (24,043)
080 190 - Mid-Tex Gas Division Retirement 080.72389 38000 4,926
080 190 - Mid-Tex Gas Division Retirement 080.72390 37602 (5,677)
080 190 - Mid-Tex Gas Division Retirement 080.72390 38000 (9,412)
080 190 - Mid-Tex Gas Division Retirement 080.72391 37601 (1,967)
080 190 - Mid-Tex Gas Division Retirement 080.72391 37602 (3,490)
080 190 - Mid-Tex Gas Division Retirement 080.72391 38000 (8,772)
080 190 - Mid-Tex Gas Division Retirement 080.72392 37601 (494)
080 190 - Mid-Tex Gas Division Retirement 080.72392 37602 (19)
080 190 - Mid-Tex Gas Division Retirement 080.72392 38000 (313)
080 190 - Mid-Tex Gas Division Retirement 080.72413 37601 (9,716)
080 190 - Mid-Tex Gas Division Retirement 080.72413 37800 (791)
080 190 - Mid-Tex Gas Division Retirement 080.72420 37601 (196)
080 190 - Mid-Tex Gas Division Retirement 080.72420 37602 1,921
080 190 - Mid-Tex Gas Division Retirement 080.72420 38000 (6,032)
080 190 - Mid-Tex Gas Division Retirement 080.72437 38000 255
080 190 - Mid-Tex Gas Division Retirement 080.72438 37602 (6,621)
080 190 - Mid-Tex Gas Division Retirement 080.72438 38000 (26,065)
080 190 - Mid-Tex Gas Division Retirement 080.72439 37601 (2,934)
080 190 - Mid-Tex Gas Division Retirement 080.72439 37602 (4,088)
MTX Retirements by FERC
Page 5 of 30
551
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.72439 38000 (21,895)
080 190 - Mid-Tex Gas Division Retirement 080.72448 37601 (35)
080 190 - Mid-Tex Gas Division Retirement 080.72448 38000 (332)
080 190 - Mid-Tex Gas Division Retirement 080.72449 37601 15,653
080 190 - Mid-Tex Gas Division Retirement 080.72449 38000 (6,004)
080 190 - Mid-Tex Gas Division Retirement 080.72450 37601 (234)
080 190 - Mid-Tex Gas Division Retirement 080.72450 38000 109
080 190 - Mid-Tex Gas Division Retirement 080.72452 37601 (535)
080 190 - Mid-Tex Gas Division Retirement 080.72452 37602 (1,162)
080 190 - Mid-Tex Gas Division Retirement 080.72452 38000 (2,998)
080 190 - Mid-Tex Gas Division Retirement 080.72461 38000 490
080 190 - Mid-Tex Gas Division Retirement 080.72473 37601 (6,188)
080 190 - Mid-Tex Gas Division Retirement 080.72473 37602 (276)
080 190 - Mid-Tex Gas Division Retirement 080.72473 37800 (5,835)
080 190 - Mid-Tex Gas Division Retirement 080.72490 38000 1,515
080 190 - Mid-Tex Gas Division Retirement 080.72497 38000 676
080 190 - Mid-Tex Gas Division Retirement 080.72500 37601 (5,377)
080 190 - Mid-Tex Gas Division Retirement 080.72500 37602 (128,217)
080 190 - Mid-Tex Gas Division Retirement 080.72505 38000 6,209
080 190 - Mid-Tex Gas Division Retirement 080.72508 37601 (190)
080 190 - Mid-Tex Gas Division Retirement 080.72512 37601 157
080 190 - Mid-Tex Gas Division Retirement 080.72512 37602 94
080 190 - Mid-Tex Gas Division Retirement 080.72512 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.72524 37602 (1,389)
080 190 - Mid-Tex Gas Division Retirement 080.72525 37601 (1,761)
080 190 - Mid-Tex Gas Division Retirement 080.72525 37602 (1,916)
080 190 - Mid-Tex Gas Division Retirement 080.72525 38000 (14,770)
080 190 - Mid-Tex Gas Division Retirement 080.72526 37601 (15,165)
080 190 - Mid-Tex Gas Division Retirement 080.72526 37602 1,114
080 190 - Mid-Tex Gas Division Retirement 080.72526 38000 (19,588)
080 190 - Mid-Tex Gas Division Retirement 080.72527 37601 (187,453)
080 190 - Mid-Tex Gas Division Retirement 080.72527 38000 (8,323)
080 190 - Mid-Tex Gas Division Retirement 080.72528 37601 (403,790)
080 190 - Mid-Tex Gas Division Retirement 080.72528 38000 (6,854)
080 190 - Mid-Tex Gas Division Retirement 080.72529 37601 (33,460)
080 190 - Mid-Tex Gas Division Retirement 080.72529 38000 (26,781)
080 190 - Mid-Tex Gas Division Retirement 080.72533 37601 (288)
080 190 - Mid-Tex Gas Division Retirement 080.72533 37602 (1,745)
080 190 - Mid-Tex Gas Division Retirement 080.72533 38000 (624)
080 190 - Mid-Tex Gas Division Retirement 080.72535 37601 (1,427)
080 190 - Mid-Tex Gas Division Retirement 080.72535 37602 (198)
080 190 - Mid-Tex Gas Division Retirement 080.72535 38000 (3,373)
080 190 - Mid-Tex Gas Division Retirement 080.72536 37601 (1,309)
080 190 - Mid-Tex Gas Division Retirement 080.72536 37602 (631)
080 190 - Mid-Tex Gas Division Retirement 080.72536 38000 (15,748)
080 190 - Mid-Tex Gas Division Retirement 080.72545 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.72550 37601 (576)
080 190 - Mid-Tex Gas Division Retirement 080.72559 37602 (2,277)
080 190 - Mid-Tex Gas Division Retirement 080.72607 37601 4
080 190 - Mid-Tex Gas Division Retirement 080.72607 37602 330
080 190 - Mid-Tex Gas Division Retirement 080.72617 37601 (18,298)
080 190 - Mid-Tex Gas Division Retirement 080.72617 37602 (796)
080 190 - Mid-Tex Gas Division Retirement 080.72617 38000 (16,933)
080 190 - Mid-Tex Gas Division Retirement 080.72618 37601 (17)
080 190 - Mid-Tex Gas Division Retirement 080.72618 37602 35
080 190 - Mid-Tex Gas Division Retirement 080.72623 37602 (449)
080 190 - Mid-Tex Gas Division Retirement 080.72649 37601 (2,801)
080 190 - Mid-Tex Gas Division Retirement 080.72649 37602 (1,994)
080 190 - Mid-Tex Gas Division Retirement 080.72649 38000 (2,840)
080 190 - Mid-Tex Gas Division Retirement 080.72651 37601 (3,357)
080 190 - Mid-Tex Gas Division Retirement 080.72651 37602 (766)
080 190 - Mid-Tex Gas Division Retirement 080.72653 37602 (2,068)
080 190 - Mid-Tex Gas Division Retirement 080.72656 37601 (4,002)
080 190 - Mid-Tex Gas Division Retirement 080.72656 38000 (3,747)
080 190 - Mid-Tex Gas Division Retirement 080.72658 37602 (27,325)
080 190 - Mid-Tex Gas Division Retirement 080.72663 37602 (77)
080 190 - Mid-Tex Gas Division Retirement 080.72678 37601 (16)
080 190 - Mid-Tex Gas Division Retirement 080.72678 38000 637
080 190 - Mid-Tex Gas Division Retirement 080.72696 37601 (17,029)
080 190 - Mid-Tex Gas Division Retirement 080.72696 37602 (115,853)
080 190 - Mid-Tex Gas Division Retirement 080.72696 38000 (19,577)
080 190 - Mid-Tex Gas Division Retirement 080.72700 37601 (13,744)
080 190 - Mid-Tex Gas Division Retirement 080.72700 37800 (395,139)
080 190 - Mid-Tex Gas Division Retirement 080.72726 37601 (379)
080 190 - Mid-Tex Gas Division Retirement 080.72726 37602 (22,610)
080 190 - Mid-Tex Gas Division Retirement 080.72726 38000 (7,538)
080 190 - Mid-Tex Gas Division Retirement 080.72742 37601 (142)
080 190 - Mid-Tex Gas Division Retirement 080.72742 37602 (1,349)
080 190 - Mid-Tex Gas Division Retirement 080.72742 38000 (1,424)
080 190 - Mid-Tex Gas Division Retirement 080.72743 38000 2,945
080 190 - Mid-Tex Gas Division Retirement 080.72751 37601 (117,642)
080 190 - Mid-Tex Gas Division Retirement 080.72751 37800 (3,020)
080 190 - Mid-Tex Gas Division Retirement 080.72759 37601 (24,375)
080 190 - Mid-Tex Gas Division Retirement 080.72760 37601 (424)
080 190 - Mid-Tex Gas Division Retirement 080.72760 37602 (9,774)
080 190 - Mid-Tex Gas Division Retirement 080.72760 37800 (10,522)
080 190 - Mid-Tex Gas Division Retirement 080.72760 38000 (13,271)
080 190 - Mid-Tex Gas Division Retirement 080.72762 37601 (29,065)
080 190 - Mid-Tex Gas Division Retirement 080.72762 37602 12,084
080 190 - Mid-Tex Gas Division Retirement 080.72762 38000 (2,939)
080 190 - Mid-Tex Gas Division Retirement 080.72763 37601 (2,008)
080 190 - Mid-Tex Gas Division Retirement 080.72763 37602 (24,649)
080 190 - Mid-Tex Gas Division Retirement 080.72763 37800 (7,147)
080 190 - Mid-Tex Gas Division Retirement 080.72763 38000 (12,394)
080 190 - Mid-Tex Gas Division Retirement 080.72764 37601 (158,864)
080 190 - Mid-Tex Gas Division Retirement 080.72764 37800 (35,445)
080 190 - Mid-Tex Gas Division Retirement 080.72764 38000 (51)
080 190 - Mid-Tex Gas Division Retirement 080.72765 38000 10
080 190 - Mid-Tex Gas Division Retirement 080.72767 37601 (931)
080 190 - Mid-Tex Gas Division Retirement 080.72767 37800 (73,740)
080 190 - Mid-Tex Gas Division Retirement 080.72767 38000 (1,326)
080 190 - Mid-Tex Gas Division Retirement 080.72780 37601 (1,672)
080 190 - Mid-Tex Gas Division Retirement 080.72780 37602 (15,690)
080 190 - Mid-Tex Gas Division Retirement 080.72780 37800 (1,921)
080 190 - Mid-Tex Gas Division Retirement 080.72780 38000 453
080 190 - Mid-Tex Gas Division Retirement 080.72785 37601 (2,502)
080 190 - Mid-Tex Gas Division Retirement 080.72785 37602 289
MTX Retirements by FERC
Page 6 of 30
552
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.72785 38000 (243)
080 190 - Mid-Tex Gas Division Retirement 080.72789 37602 (783)
080 190 - Mid-Tex Gas Division Retirement 080.72819 37602 (2,553)
080 190 - Mid-Tex Gas Division Retirement 080.72825 38000 956
080 190 - Mid-Tex Gas Division Retirement 080.72837 37601 6
080 190 - Mid-Tex Gas Division Retirement 080.72837 37602 393
080 190 - Mid-Tex Gas Division Retirement 080.72837 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.72840 37601 (6,886)
080 190 - Mid-Tex Gas Division Retirement 080.72840 37602 (24,008)
080 190 - Mid-Tex Gas Division Retirement 080.72840 38000 (21,510)
080 190 - Mid-Tex Gas Division Retirement 080.72841 37602 (159)
080 190 - Mid-Tex Gas Division Retirement 080.72855 37602 (2,340)
080 190 - Mid-Tex Gas Division Retirement 080.72857 37602 (13,800)
080 190 - Mid-Tex Gas Division Retirement 080.72869 37601 (620)
080 190 - Mid-Tex Gas Division Retirement 080.72869 37602 339
080 190 - Mid-Tex Gas Division Retirement 080.72869 37800 (4,327)
080 190 - Mid-Tex Gas Division Retirement 080.72869 38000 (4)
080 190 - Mid-Tex Gas Division Retirement 080.72891 37601 (26)
080 190 - Mid-Tex Gas Division Retirement 080.72906 37602 (39,538)
080 190 - Mid-Tex Gas Division Retirement 080.72906 38000 (4,294)
080 190 - Mid-Tex Gas Division Retirement 080.72930 37601 (123,779)
080 190 - Mid-Tex Gas Division Retirement 080.72930 37602 (4,458)
080 190 - Mid-Tex Gas Division Retirement 080.72935 37601 931
080 190 - Mid-Tex Gas Division Retirement 080.72935 37602 (2,388)
080 190 - Mid-Tex Gas Division Retirement 080.72935 38000 2,094
080 190 - Mid-Tex Gas Division Retirement 080.72949 37601 (24)
080 190 - Mid-Tex Gas Division Retirement 080.72954 37601 (1,953)
080 190 - Mid-Tex Gas Division Retirement 080.72954 38000 (1,139)
080 190 - Mid-Tex Gas Division Retirement 080.72959 37601 212
080 190 - Mid-Tex Gas Division Retirement 080.72959 38000 (2,226)
080 190 - Mid-Tex Gas Division Retirement 080.72970 37601 (2,776)
080 190 - Mid-Tex Gas Division Retirement 080.72970 38000 (4,270)
080 190 - Mid-Tex Gas Division Retirement 080.72973 37601 277
080 190 - Mid-Tex Gas Division Retirement 080.72973 38000 (22,771)
080 190 - Mid-Tex Gas Division Retirement 080.72975 37601 (5,351)
080 190 - Mid-Tex Gas Division Retirement 080.72975 38000 (1,883)
080 190 - Mid-Tex Gas Division Retirement 080.72978 37601 79
080 190 - Mid-Tex Gas Division Retirement 080.72983 37602 4,292
080 190 - Mid-Tex Gas Division Retirement 080.72983 38000 5,094
080 190 - Mid-Tex Gas Division Retirement 080.72987 37601 (1,234)
080 190 - Mid-Tex Gas Division Retirement 080.72987 37602 (1,149)
080 190 - Mid-Tex Gas Division Retirement 080.72987 38000 (4,468)
080 190 - Mid-Tex Gas Division Retirement 080.72988 37601 (797)
080 190 - Mid-Tex Gas Division Retirement 080.72988 37602 (6,956)
080 190 - Mid-Tex Gas Division Retirement 080.72988 38000 (10,946)
080 190 - Mid-Tex Gas Division Retirement 080.72990 37601 (893)
080 190 - Mid-Tex Gas Division Retirement 080.72990 38000 (2,540)
080 190 - Mid-Tex Gas Division Retirement 080.72991 37601 (2,280)
080 190 - Mid-Tex Gas Division Retirement 080.72991 37602 (413)
080 190 - Mid-Tex Gas Division Retirement 080.72991 38000 (24,202)
080 190 - Mid-Tex Gas Division Retirement 080.73007 38000 22
080 190 - Mid-Tex Gas Division Retirement 080.73024 37601 (4,456)
080 190 - Mid-Tex Gas Division Retirement 080.73024 38000 45
080 190 - Mid-Tex Gas Division Retirement 080.73025 38000 1,137
080 190 - Mid-Tex Gas Division Retirement 080.73026 37601 1,292
080 190 - Mid-Tex Gas Division Retirement 080.73026 37602 366
080 190 - Mid-Tex Gas Division Retirement 080.73026 38000 2,908
080 190 - Mid-Tex Gas Division Retirement 080.73027 38000 5,981
080 190 - Mid-Tex Gas Division Retirement 080.73028 37601 181
080 190 - Mid-Tex Gas Division Retirement 080.73028 38000 1,380
080 190 - Mid-Tex Gas Division Retirement 080.73029 38000 (7,860)
080 190 - Mid-Tex Gas Division Retirement 080.73031 37601 (1,726)
080 190 - Mid-Tex Gas Division Retirement 080.73031 37602 432
080 190 - Mid-Tex Gas Division Retirement 080.73031 38000 (14,695)
080 190 - Mid-Tex Gas Division Retirement 080.73032 38000 351
080 190 - Mid-Tex Gas Division Retirement 080.73033 38000 (379)
080 190 - Mid-Tex Gas Division Retirement 080.73053 37601 (408)
080 190 - Mid-Tex Gas Division Retirement 080.73053 37602 (5,012)
080 190 - Mid-Tex Gas Division Retirement 080.73053 38000 55,199
080 190 - Mid-Tex Gas Division Retirement 080.73068 38000 (3,525)
080 190 - Mid-Tex Gas Division Retirement 080.73083 37602 (465)
080 190 - Mid-Tex Gas Division Retirement 080.73083 38000 (20)
080 190 - Mid-Tex Gas Division Retirement 080.73089 37601 (57)
080 190 - Mid-Tex Gas Division Retirement 080.73089 37800 (1,087)
080 190 - Mid-Tex Gas Division Retirement 080.73094 38000 (46)
080 190 - Mid-Tex Gas Division Retirement 080.73107 38000 (61)
080 190 - Mid-Tex Gas Division Retirement 080.73111 38000 769
080 190 - Mid-Tex Gas Division Retirement 080.73137 37601 244
080 190 - Mid-Tex Gas Division Retirement 080.73137 38000 2,185
080 190 - Mid-Tex Gas Division Retirement 080.73147 37601 (85)
080 190 - Mid-Tex Gas Division Retirement 080.73147 38000 (104)
080 190 - Mid-Tex Gas Division Retirement 080.73159 37602 (1,357)
080 190 - Mid-Tex Gas Division Retirement 080.73159 38000 (459)
080 190 - Mid-Tex Gas Division Retirement 080.73163 38000 (2,635)
080 190 - Mid-Tex Gas Division Retirement 080.73164 37601 (2,259)
080 190 - Mid-Tex Gas Division Retirement 080.73164 38000 (9,510)
080 190 - Mid-Tex Gas Division Retirement 080.73169 37601 (7,119)
080 190 - Mid-Tex Gas Division Retirement 080.73169 37602 (644)
080 190 - Mid-Tex Gas Division Retirement 080.73169 38000 (3,652)
080 190 - Mid-Tex Gas Division Retirement 080.73174 38000 558
080 190 - Mid-Tex Gas Division Retirement 080.73182 37601 (11,474)
080 190 - Mid-Tex Gas Division Retirement 080.73182 37602 (5,183)
080 190 - Mid-Tex Gas Division Retirement 080.73182 38000 (27,172)
080 190 - Mid-Tex Gas Division Retirement 080.73194 38000 1,099
080 190 - Mid-Tex Gas Division Retirement 080.73221 38000 1,638
080 190 - Mid-Tex Gas Division Retirement 080.73224 37601 17
080 190 - Mid-Tex Gas Division Retirement 080.73224 38000 (473)
080 190 - Mid-Tex Gas Division Retirement 080.73226 38000 4,742
080 190 - Mid-Tex Gas Division Retirement 080.73228 37601 5,669
080 190 - Mid-Tex Gas Division Retirement 080.73228 37602 (55)
080 190 - Mid-Tex Gas Division Retirement 080.73228 38000 (1,653)
080 190 - Mid-Tex Gas Division Retirement 080.73230 37602 1,303
080 190 - Mid-Tex Gas Division Retirement 080.73238 37601 82,429
080 190 - Mid-Tex Gas Division Retirement 080.73273 37601 (7,231)
080 190 - Mid-Tex Gas Division Retirement 080.73273 37602 (33)
080 190 - Mid-Tex Gas Division Retirement 080.73273 38000 (4,134)
080 190 - Mid-Tex Gas Division Retirement 080.73283 37601 6
MTX Retirements by FERC
Page 7 of 30
553
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.73283 38000 (98)
080 190 - Mid-Tex Gas Division Retirement 080.73288 37601 (2,517)
080 190 - Mid-Tex Gas Division Retirement 080.73288 37602 422
080 190 - Mid-Tex Gas Division Retirement 080.73288 38000 716
080 190 - Mid-Tex Gas Division Retirement 080.73297 37602 (877)
080 190 - Mid-Tex Gas Division Retirement 080.73300 37601 1,441
080 190 - Mid-Tex Gas Division Retirement 080.73300 37602 411
080 190 - Mid-Tex Gas Division Retirement 080.73300 38000 (2,626)
080 190 - Mid-Tex Gas Division Retirement 080.73308 38000 177
080 190 - Mid-Tex Gas Division Retirement 080.73315 37601 (4,539)
080 190 - Mid-Tex Gas Division Retirement 080.73315 37602 (2,294)
080 190 - Mid-Tex Gas Division Retirement 080.73322 37601 (148,105)
080 190 - Mid-Tex Gas Division Retirement 080.73322 37602 (3,413)
080 190 - Mid-Tex Gas Division Retirement 080.73322 38000 (2,135)
080 190 - Mid-Tex Gas Division Retirement 080.73327 37601 17
080 190 - Mid-Tex Gas Division Retirement 080.73327 37602 46
080 190 - Mid-Tex Gas Division Retirement 080.73327 38000 625
080 190 - Mid-Tex Gas Division Retirement 080.73329 37601 (2,089)
080 190 - Mid-Tex Gas Division Retirement 080.73329 37602 (8,598)
080 190 - Mid-Tex Gas Division Retirement 080.73329 38000 (111)
080 190 - Mid-Tex Gas Division Retirement 080.73342 37601 (677)
080 190 - Mid-Tex Gas Division Retirement 080.73342 37602 (313)
080 190 - Mid-Tex Gas Division Retirement 080.73342 37800 (218,234)
080 190 - Mid-Tex Gas Division Retirement 080.73352 37601 (250,920)
080 190 - Mid-Tex Gas Division Retirement 080.73358 37601 (4,535)
080 190 - Mid-Tex Gas Division Retirement 080.73358 38000 6,327
080 190 - Mid-Tex Gas Division Retirement 080.73371 37602 3,355
080 190 - Mid-Tex Gas Division Retirement 080.73371 38000 (914)
080 190 - Mid-Tex Gas Division Retirement 080.73387 37602 1,451
080 190 - Mid-Tex Gas Division Retirement 080.73388 37601 113
080 190 - Mid-Tex Gas Division Retirement 080.73388 37602 (275)
080 190 - Mid-Tex Gas Division Retirement 080.73390 37602 (22,455)
080 190 - Mid-Tex Gas Division Retirement 080.73406 38000 761
080 190 - Mid-Tex Gas Division Retirement 080.73410 37601 158
080 190 - Mid-Tex Gas Division Retirement 080.73410 38000 (2,300)
080 190 - Mid-Tex Gas Division Retirement 080.73411 37601 (3,446)
080 190 - Mid-Tex Gas Division Retirement 080.73411 37602 (1,728)
080 190 - Mid-Tex Gas Division Retirement 080.73411 38000 (5,568)
080 190 - Mid-Tex Gas Division Retirement 080.73413 38000 (4,410)
080 190 - Mid-Tex Gas Division Retirement 080.73430 37602 (325)
080 190 - Mid-Tex Gas Division Retirement 080.73442 38000 (9,851)
080 190 - Mid-Tex Gas Division Retirement 080.73450 37601 (906)
080 190 - Mid-Tex Gas Division Retirement 080.73450 38000 (3,273)
080 190 - Mid-Tex Gas Division Retirement 080.73452 37601 (988)
080 190 - Mid-Tex Gas Division Retirement 080.73452 38000 (1,981)
080 190 - Mid-Tex Gas Division Retirement 080.73453 38000 (9,350)
080 190 - Mid-Tex Gas Division Retirement 080.73454 37601 (368)
080 190 - Mid-Tex Gas Division Retirement 080.73454 37602 (1,008)
080 190 - Mid-Tex Gas Division Retirement 080.73454 38000 (14,542)
080 190 - Mid-Tex Gas Division Retirement 080.73455 37601 (2,085)
080 190 - Mid-Tex Gas Division Retirement 080.73455 37602 (3,612)
080 190 - Mid-Tex Gas Division Retirement 080.73455 38000 (14,400)
080 190 - Mid-Tex Gas Division Retirement 080.73457 37601 (2,854)
080 190 - Mid-Tex Gas Division Retirement 080.73457 37602 (8,713)
080 190 - Mid-Tex Gas Division Retirement 080.73457 38000 (4,127)
080 190 - Mid-Tex Gas Division Retirement 080.73460 37601 (1,058)
080 190 - Mid-Tex Gas Division Retirement 080.73460 38000 (1,977)
080 190 - Mid-Tex Gas Division Retirement 080.73462 37601 (898)
080 190 - Mid-Tex Gas Division Retirement 080.73462 38000 (6,665)
080 190 - Mid-Tex Gas Division Retirement 080.73468 38000 2,945
080 190 - Mid-Tex Gas Division Retirement 080.73479 38000 4
080 190 - Mid-Tex Gas Division Retirement 080.73493 37602 (52)
080 190 - Mid-Tex Gas Division Retirement 080.73493 37800 (60,100)
080 190 - Mid-Tex Gas Division Retirement 080.73497 37602 (17,665)
080 190 - Mid-Tex Gas Division Retirement 080.73497 38000 (98,261)
080 190 - Mid-Tex Gas Division Retirement 080.73514 37601 (114,931)
080 190 - Mid-Tex Gas Division Retirement 080.73514 37602 (39,737)
080 190 - Mid-Tex Gas Division Retirement 080.73514 38000 (19,760)
080 190 - Mid-Tex Gas Division Retirement 080.73517 37601 (22,355)
080 190 - Mid-Tex Gas Division Retirement 080.73517 37602 (9,610)
080 190 - Mid-Tex Gas Division Retirement 080.73517 38000 (15,525)
080 190 - Mid-Tex Gas Division Retirement 080.73523 38000 1
080 190 - Mid-Tex Gas Division Retirement 080.73531 38000 (4,237)
080 190 - Mid-Tex Gas Division Retirement 080.73546 37602 3
080 190 - Mid-Tex Gas Division Retirement 080.73557 38000 (2,032)
080 190 - Mid-Tex Gas Division Retirement 080.73558 37601 331
080 190 - Mid-Tex Gas Division Retirement 080.73558 38000 (18,070)
080 190 - Mid-Tex Gas Division Retirement 080.73574 37601 (17)
080 190 - Mid-Tex Gas Division Retirement 080.73574 38000 17
080 190 - Mid-Tex Gas Division Retirement 080.73575 37602 (3,852)
080 190 - Mid-Tex Gas Division Retirement 080.73575 38000 (48,881)
080 190 - Mid-Tex Gas Division Retirement 080.73576 37602 (180)
080 190 - Mid-Tex Gas Division Retirement 080.73579 37601 (23,161)
080 190 - Mid-Tex Gas Division Retirement 080.73579 37602 (6,478)
080 190 - Mid-Tex Gas Division Retirement 080.73579 38000 (2,155)
080 190 - Mid-Tex Gas Division Retirement 080.73586 37601 7
080 190 - Mid-Tex Gas Division Retirement 080.73586 38000 447
080 190 - Mid-Tex Gas Division Retirement 080.73587 37601 (272)
080 190 - Mid-Tex Gas Division Retirement 080.73587 37602 (2,725)
080 190 - Mid-Tex Gas Division Retirement 080.73587 38000 (1,418)
080 190 - Mid-Tex Gas Division Retirement 080.73592 37601 (513)
080 190 - Mid-Tex Gas Division Retirement 080.73592 37602 (1,884)
080 190 - Mid-Tex Gas Division Retirement 080.73592 38000 (11,359)
080 190 - Mid-Tex Gas Division Retirement 080.73593 37601 (396)
080 190 - Mid-Tex Gas Division Retirement 080.73593 37602 43
080 190 - Mid-Tex Gas Division Retirement 080.73593 38000 (9,874)
080 190 - Mid-Tex Gas Division Retirement 080.73601 37602 225
080 190 - Mid-Tex Gas Division Retirement 080.73601 38000 2,668
080 190 - Mid-Tex Gas Division Retirement 080.73614 38000 (14,827)
080 190 - Mid-Tex Gas Division Retirement 080.73616 38000 (3,191)
080 190 - Mid-Tex Gas Division Retirement 080.73618 37601 (21)
080 190 - Mid-Tex Gas Division Retirement 080.73626 37601 706
080 190 - Mid-Tex Gas Division Retirement 080.73626 37602 (601)
080 190 - Mid-Tex Gas Division Retirement 080.73626 38000 4,129
080 190 - Mid-Tex Gas Division Retirement 080.73641 37602 21
080 190 - Mid-Tex Gas Division Retirement 080.73641 38000 69
080 190 - Mid-Tex Gas Division Retirement 080.73655 37601 (4,035)
MTX Retirements by FERC
Page 8 of 30
554
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.73655 37602 (16)
080 190 - Mid-Tex Gas Division Retirement 080.73655 38000 (15,552)
080 190 - Mid-Tex Gas Division Retirement 080.73657 37601 (236)
080 190 - Mid-Tex Gas Division Retirement 080.73657 37602 (10)
080 190 - Mid-Tex Gas Division Retirement 080.73657 38000 (109)
080 190 - Mid-Tex Gas Division Retirement 080.73671 37601 (1,857)
080 190 - Mid-Tex Gas Division Retirement 080.73671 37602 (719)
080 190 - Mid-Tex Gas Division Retirement 080.73671 38000 (17,348)
080 190 - Mid-Tex Gas Division Retirement 080.73672 37601 (2,616)
080 190 - Mid-Tex Gas Division Retirement 080.73672 37602 (338)
080 190 - Mid-Tex Gas Division Retirement 080.73672 38000 (2,121)
080 190 - Mid-Tex Gas Division Retirement 080.73678 37601 (18,058)
080 190 - Mid-Tex Gas Division Retirement 080.73678 38000 (20)
080 190 - Mid-Tex Gas Division Retirement 080.73695 37602 10,927
080 190 - Mid-Tex Gas Division Retirement 080.73695 38000 (423)
080 190 - Mid-Tex Gas Division Retirement 080.73701 37602 (5,436)
080 190 - Mid-Tex Gas Division Retirement 080.73701 38000 (16,081)
080 190 - Mid-Tex Gas Division Retirement 080.73703 37601 (8)
080 190 - Mid-Tex Gas Division Retirement 080.73703 37602 (134)
080 190 - Mid-Tex Gas Division Retirement 080.73703 38000 (1,456)
080 190 - Mid-Tex Gas Division Retirement 080.73720 37602 (612)
080 190 - Mid-Tex Gas Division Retirement 080.73729 37601 10,699
080 190 - Mid-Tex Gas Division Retirement 080.73729 38000 856
080 190 - Mid-Tex Gas Division Retirement 080.73730 38000 428
080 190 - Mid-Tex Gas Division Retirement 080.73732 37601 31
080 190 - Mid-Tex Gas Division Retirement 080.73741 37601 (20)
080 190 - Mid-Tex Gas Division Retirement 080.73741 38000 (2,988)
080 190 - Mid-Tex Gas Division Retirement 080.73745 37601 (4,710)
080 190 - Mid-Tex Gas Division Retirement 080.73745 37602 (897)
080 190 - Mid-Tex Gas Division Retirement 080.73745 38000 (8,088)
080 190 - Mid-Tex Gas Division Retirement 080.73753 37601 (280,527)
080 190 - Mid-Tex Gas Division Retirement 080.73753 37602 (24)
080 190 - Mid-Tex Gas Division Retirement 080.73753 38000 (37,453)
080 190 - Mid-Tex Gas Division Retirement 080.73755 37601 (41,036)
080 190 - Mid-Tex Gas Division Retirement 080.73755 38000 (2,298)
080 190 - Mid-Tex Gas Division Retirement 080.73761 37602 (17,651)
080 190 - Mid-Tex Gas Division Retirement 080.73761 38000 (10)
080 190 - Mid-Tex Gas Division Retirement 080.73773 37602 242
080 190 - Mid-Tex Gas Division Retirement 080.73773 38000 87,150
080 190 - Mid-Tex Gas Division Retirement 080.73784 38000 (493)
080 190 - Mid-Tex Gas Division Retirement 080.73787 38000 252
080 190 - Mid-Tex Gas Division Retirement 080.73793 37601 (1,986)
080 190 - Mid-Tex Gas Division Retirement 080.73793 37602 (3,183)
080 190 - Mid-Tex Gas Division Retirement 080.73793 38000 (588)
080 190 - Mid-Tex Gas Division Retirement 080.73807 37601 (13)
080 190 - Mid-Tex Gas Division Retirement 080.73807 37800 (10,660)
080 190 - Mid-Tex Gas Division Retirement 080.73810 37601 (222)
080 190 - Mid-Tex Gas Division Retirement 080.73810 38000 (1,669)
080 190 - Mid-Tex Gas Division Retirement 080.73814 37601 34
080 190 - Mid-Tex Gas Division Retirement 080.73814 38000 153
080 190 - Mid-Tex Gas Division Retirement 080.73837 37601 198
080 190 - Mid-Tex Gas Division Retirement 080.73837 38000 (2,889)
080 190 - Mid-Tex Gas Division Retirement 080.73839 37601 (101,062)
080 190 - Mid-Tex Gas Division Retirement 080.73839 37602 (354)
080 190 - Mid-Tex Gas Division Retirement 080.73839 38000 (12,911)
080 190 - Mid-Tex Gas Division Retirement 080.73840 37601 (684)
080 190 - Mid-Tex Gas Division Retirement 080.73840 37602 (8,067)
080 190 - Mid-Tex Gas Division Retirement 080.73840 38000 (13,829)
080 190 - Mid-Tex Gas Division Retirement 080.73841 37601 (117,856)
080 190 - Mid-Tex Gas Division Retirement 080.73841 38000 (23,487)
080 190 - Mid-Tex Gas Division Retirement 080.73842 37601 (369)
080 190 - Mid-Tex Gas Division Retirement 080.73842 37602 (4,137)
080 190 - Mid-Tex Gas Division Retirement 080.73842 38000 (3,964)
080 190 - Mid-Tex Gas Division Retirement 080.73845 37602 (2,905)
080 190 - Mid-Tex Gas Division Retirement 080.73845 38000 (7,461)
080 190 - Mid-Tex Gas Division Retirement 080.73846 37601 (14,997)
080 190 - Mid-Tex Gas Division Retirement 080.73846 38000 (22,836)
080 190 - Mid-Tex Gas Division Retirement 080.73847 37601 (5,809)
080 190 - Mid-Tex Gas Division Retirement 080.73847 38000 (11,021)
080 190 - Mid-Tex Gas Division Retirement 080.73848 37601 (8,099)
080 190 - Mid-Tex Gas Division Retirement 080.73848 38000 (10,458)
080 190 - Mid-Tex Gas Division Retirement 080.73849 37601 (6,194)
080 190 - Mid-Tex Gas Division Retirement 080.73849 38000 (11,663)
080 190 - Mid-Tex Gas Division Retirement 080.73853 38000 (3,762)
080 190 - Mid-Tex Gas Division Retirement 080.73859 37601 (2,861)
080 190 - Mid-Tex Gas Division Retirement 080.73859 38000 (981)
080 190 - Mid-Tex Gas Division Retirement 080.73865 37601 (5,785)
080 190 - Mid-Tex Gas Division Retirement 080.73865 37602 (10,628)
080 190 - Mid-Tex Gas Division Retirement 080.73865 38000 (20,747)
080 190 - Mid-Tex Gas Division Retirement 080.73872 37601 (4,627)
080 190 - Mid-Tex Gas Division Retirement 080.73872 37800 (4,779)
080 190 - Mid-Tex Gas Division Retirement 080.73876 37601 (8,267)
080 190 - Mid-Tex Gas Division Retirement 080.73883 37601 (3,052)
080 190 - Mid-Tex Gas Division Retirement 080.73883 38000 (1,935)
080 190 - Mid-Tex Gas Division Retirement 080.73885 37601 (1,217)
080 190 - Mid-Tex Gas Division Retirement 080.73885 38000 (11,983)
080 190 - Mid-Tex Gas Division Retirement 080.73890 37601 156
080 190 - Mid-Tex Gas Division Retirement 080.73890 37602 747
080 190 - Mid-Tex Gas Division Retirement 080.73890 38000 (432)
080 190 - Mid-Tex Gas Division Retirement 080.73892 37601 (10,904)
080 190 - Mid-Tex Gas Division Retirement 080.73892 38000 (1,331)
080 190 - Mid-Tex Gas Division Retirement 080.73895 37601 (2,744)
080 190 - Mid-Tex Gas Division Retirement 080.73895 37602 (15,918)
080 190 - Mid-Tex Gas Division Retirement 080.73895 38000 (18,652)
080 190 - Mid-Tex Gas Division Retirement 080.73896 37601 (1,120)
080 190 - Mid-Tex Gas Division Retirement 080.73896 38000 (8,551)
080 190 - Mid-Tex Gas Division Retirement 080.73897 37602 (12,265)
080 190 - Mid-Tex Gas Division Retirement 080.73903 37601 (3,183)
080 190 - Mid-Tex Gas Division Retirement 080.73903 38000 (4,061)
080 190 - Mid-Tex Gas Division Retirement 080.73908 37601 562
080 190 - Mid-Tex Gas Division Retirement 080.73908 37602 (77)
080 190 - Mid-Tex Gas Division Retirement 080.73908 38000 (9,631)
080 190 - Mid-Tex Gas Division Retirement 080.73914 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.73938 38000 (511)
080 190 - Mid-Tex Gas Division Retirement 080.73941 37601 (65)
080 190 - Mid-Tex Gas Division Retirement 080.73941 38000 (14,855)
080 190 - Mid-Tex Gas Division Retirement 080.73952 37601 651
MTX Retirements by FERC
Page 9 of 30
555
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.73952 38000 88
080 190 - Mid-Tex Gas Division Retirement 080.73959 37601 539
080 190 - Mid-Tex Gas Division Retirement 080.73959 38000 (215)
080 190 - Mid-Tex Gas Division Retirement 080.73965 37601 (41,851)
080 190 - Mid-Tex Gas Division Retirement 080.73965 38000 (20,190)
080 190 - Mid-Tex Gas Division Retirement 080.73972 37601 (1,875)
080 190 - Mid-Tex Gas Division Retirement 080.73972 38000 (1,887)
080 190 - Mid-Tex Gas Division Retirement 080.73979 37602 (1,474)
080 190 - Mid-Tex Gas Division Retirement 080.73983 37601 (3,082)
080 190 - Mid-Tex Gas Division Retirement 080.73983 37602 (998)
080 190 - Mid-Tex Gas Division Retirement 080.73983 38000 (3,442)
080 190 - Mid-Tex Gas Division Retirement 080.73988 37601 (2,526)
080 190 - Mid-Tex Gas Division Retirement 080.73988 38000 (12,057)
080 190 - Mid-Tex Gas Division Retirement 080.73994 37601 (526,309)
080 190 - Mid-Tex Gas Division Retirement 080.73994 37602 (72)
080 190 - Mid-Tex Gas Division Retirement 080.73994 38000 (9,829)
080 190 - Mid-Tex Gas Division Retirement 080.74000 37601 (1,666)
080 190 - Mid-Tex Gas Division Retirement 080.74000 37602 (1,674)
080 190 - Mid-Tex Gas Division Retirement 080.74000 37800 (154,582)
080 190 - Mid-Tex Gas Division Retirement 080.74000 38000 (5,978)
080 190 - Mid-Tex Gas Division Retirement 080.74002 37601 (379)
080 190 - Mid-Tex Gas Division Retirement 080.74002 37602 (2,899)
080 190 - Mid-Tex Gas Division Retirement 080.74002 37800 (40,978)
080 190 - Mid-Tex Gas Division Retirement 080.74002 38000 (841)
080 190 - Mid-Tex Gas Division Retirement 080.74003 37601 (68,755)
080 190 - Mid-Tex Gas Division Retirement 080.74003 37602 (1,520)
080 190 - Mid-Tex Gas Division Retirement 080.74003 37800 (5,926)
080 190 - Mid-Tex Gas Division Retirement 080.74003 38000 (6,961)
080 190 - Mid-Tex Gas Division Retirement 080.74005 38000 31
080 190 - Mid-Tex Gas Division Retirement 080.74009 37601 (10,213)
080 190 - Mid-Tex Gas Division Retirement 080.74009 38000 (1,378)
080 190 - Mid-Tex Gas Division Retirement 080.74011 37601 (2,623)
080 190 - Mid-Tex Gas Division Retirement 080.74011 37602 (6,493)
080 190 - Mid-Tex Gas Division Retirement 080.74011 38000 (33,699)
080 190 - Mid-Tex Gas Division Retirement 080.74027 37601 (45)
080 190 - Mid-Tex Gas Division Retirement 080.74028 37601 (331)
080 190 - Mid-Tex Gas Division Retirement 080.74028 37602 (267)
080 190 - Mid-Tex Gas Division Retirement 080.74028 38000 (2,543)
080 190 - Mid-Tex Gas Division Retirement 080.74031 37601 (520)
080 190 - Mid-Tex Gas Division Retirement 080.74031 37602 (1,045)
080 190 - Mid-Tex Gas Division Retirement 080.74031 38000 (8,283)
080 190 - Mid-Tex Gas Division Retirement 080.74032 37601 (525)
080 190 - Mid-Tex Gas Division Retirement 080.74032 37602 (1,814)
080 190 - Mid-Tex Gas Division Retirement 080.74032 38000 (4,699)
080 190 - Mid-Tex Gas Division Retirement 080.74038 37601 (99)
080 190 - Mid-Tex Gas Division Retirement 080.74038 37800 (24,310)
080 190 - Mid-Tex Gas Division Retirement 080.74038 38000 (544)
080 190 - Mid-Tex Gas Division Retirement 080.74039 37601 (1,779)
080 190 - Mid-Tex Gas Division Retirement 080.74039 37602 (6,733)
080 190 - Mid-Tex Gas Division Retirement 080.74039 38000 (10,271)
080 190 - Mid-Tex Gas Division Retirement 080.74040 37601 (401)
080 190 - Mid-Tex Gas Division Retirement 080.74040 37602 (4,345)
080 190 - Mid-Tex Gas Division Retirement 080.74040 38000 (21,351)
080 190 - Mid-Tex Gas Division Retirement 080.74041 37601 (1,542)
080 190 - Mid-Tex Gas Division Retirement 080.74041 37602 (2,373)
080 190 - Mid-Tex Gas Division Retirement 080.74041 38000 (16,329)
080 190 - Mid-Tex Gas Division Retirement 080.74047 37601 34
080 190 - Mid-Tex Gas Division Retirement 080.74047 37602 (36)
080 190 - Mid-Tex Gas Division Retirement 080.74048 37601 (27,971)
080 190 - Mid-Tex Gas Division Retirement 080.74048 37602 (421)
080 190 - Mid-Tex Gas Division Retirement 080.74048 38000 (32,771)
080 190 - Mid-Tex Gas Division Retirement 080.74054 37601 (15,650)
080 190 - Mid-Tex Gas Division Retirement 080.74054 37602 (220)
080 190 - Mid-Tex Gas Division Retirement 080.74078 38000 77
080 190 - Mid-Tex Gas Division Retirement 080.74079 37601 (350)
080 190 - Mid-Tex Gas Division Retirement 080.74079 37602 3,729
080 190 - Mid-Tex Gas Division Retirement 080.74079 38000 (5,066)
080 190 - Mid-Tex Gas Division Retirement 080.74086 37601 (2,779)
080 190 - Mid-Tex Gas Division Retirement 080.74086 37602 (9,844)
080 190 - Mid-Tex Gas Division Retirement 080.74087 37601 (3,511)
080 190 - Mid-Tex Gas Division Retirement 080.74087 38000 (363)
080 190 - Mid-Tex Gas Division Retirement 080.74098 37601 (11,659)
080 190 - Mid-Tex Gas Division Retirement 080.74098 37602 (2,108)
080 190 - Mid-Tex Gas Division Retirement 080.74098 38000 (1,604)
080 190 - Mid-Tex Gas Division Retirement 080.74114 37602 (12,812)
080 190 - Mid-Tex Gas Division Retirement 080.74119 37601 (746)
080 190 - Mid-Tex Gas Division Retirement 080.74119 37602 (17,939)
080 190 - Mid-Tex Gas Division Retirement 080.74119 38000 (17,086)
080 190 - Mid-Tex Gas Division Retirement 080.74121 37601 (22,411)
080 190 - Mid-Tex Gas Division Retirement 080.74121 37602 (21,086)
080 190 - Mid-Tex Gas Division Retirement 080.74121 37800 (46,110)
080 190 - Mid-Tex Gas Division Retirement 080.74121 38000 (67,423)
080 190 - Mid-Tex Gas Division Retirement 080.74122 37601 (1,045)
080 190 - Mid-Tex Gas Division Retirement 080.74122 38000 153
080 190 - Mid-Tex Gas Division Retirement 080.74127 37602 (4,101)
080 190 - Mid-Tex Gas Division Retirement 080.74136 38000 421
080 190 - Mid-Tex Gas Division Retirement 080.74137 37601 (7,053)
080 190 - Mid-Tex Gas Division Retirement 080.74137 37602 (161)
080 190 - Mid-Tex Gas Division Retirement 080.74137 38000 (7,018)
080 190 - Mid-Tex Gas Division Retirement 080.74140 37601 (2,133)
080 190 - Mid-Tex Gas Division Retirement 080.74159 37601 (4,169)
080 190 - Mid-Tex Gas Division Retirement 080.74159 37602 (6,650)
080 190 - Mid-Tex Gas Division Retirement 080.74159 38000 (3,145)
080 190 - Mid-Tex Gas Division Retirement 080.74174 37601 (4,748)
080 190 - Mid-Tex Gas Division Retirement 080.74174 38000 (1,082)
080 190 - Mid-Tex Gas Division Retirement 080.74184 37601 (2,321)
080 190 - Mid-Tex Gas Division Retirement 080.74184 38000 (1,424)
080 190 - Mid-Tex Gas Division Retirement 080.74188 37601 (4,375)
080 190 - Mid-Tex Gas Division Retirement 080.74188 37602 (5,288)
080 190 - Mid-Tex Gas Division Retirement 080.74188 38000 (577)
080 190 - Mid-Tex Gas Division Retirement 080.74208 38000 (3,120)
080 190 - Mid-Tex Gas Division Retirement 080.74257 37601 (1,856)
080 190 - Mid-Tex Gas Division Retirement 080.74257 37602 (4,410)
080 190 - Mid-Tex Gas Division Retirement 080.74257 38000 (544)
080 190 - Mid-Tex Gas Division Retirement 080.74259 37601 (1,615)
080 190 - Mid-Tex Gas Division Retirement 080.74259 38000 (51)
080 190 - Mid-Tex Gas Division Retirement 080.74260 37601 (1,303)
MTX Retirements by FERC
Page 10 of 30
556
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.74260 37602 (11,928)
080 190 - Mid-Tex Gas Division Retirement 080.74260 37800 (59,952)
080 190 - Mid-Tex Gas Division Retirement 080.74260 38000 (22,859)
080 190 - Mid-Tex Gas Division Retirement 080.74266 37601 (5,005)
080 190 - Mid-Tex Gas Division Retirement 080.74266 38000 (1,259)
080 190 - Mid-Tex Gas Division Retirement 080.74295 37601 (158,008)
080 190 - Mid-Tex Gas Division Retirement 080.74295 38000 (371)
080 190 - Mid-Tex Gas Division Retirement 080.74299 37602 (77,147)
080 190 - Mid-Tex Gas Division Retirement 080.74299 38000 (25,166)
080 190 - Mid-Tex Gas Division Retirement 080.74305 37601 (2,450)
080 190 - Mid-Tex Gas Division Retirement 080.74305 38000 (16,046)
080 190 - Mid-Tex Gas Division Retirement 080.74312 37601 (135)
080 190 - Mid-Tex Gas Division Retirement 080.74312 38000 (165)
080 190 - Mid-Tex Gas Division Retirement 080.74313 37601 (20,417)
080 190 - Mid-Tex Gas Division Retirement 080.74313 38000 (45,230)
080 190 - Mid-Tex Gas Division Retirement 080.74318 37601 (100)
080 190 - Mid-Tex Gas Division Retirement 080.74318 37602 (92)
080 190 - Mid-Tex Gas Division Retirement 080.74318 37800 (9,643)
080 190 - Mid-Tex Gas Division Retirement 080.74320 37601 (96)
080 190 - Mid-Tex Gas Division Retirement 080.74320 37602 (1,970)
080 190 - Mid-Tex Gas Division Retirement 080.74320 37800 (26,562)
080 190 - Mid-Tex Gas Division Retirement 080.74320 38000 (683)
080 190 - Mid-Tex Gas Division Retirement 080.74321 37601 (17,280)
080 190 - Mid-Tex Gas Division Retirement 080.74321 37602 (2,086)
080 190 - Mid-Tex Gas Division Retirement 080.74328 37602 289
080 190 - Mid-Tex Gas Division Retirement 080.74335 37601 (3,265)
080 190 - Mid-Tex Gas Division Retirement 080.74335 38000 (1,628)
080 190 - Mid-Tex Gas Division Retirement 080.74340 38000 466
080 190 - Mid-Tex Gas Division Retirement 080.74341 37601 (1,477)
080 190 - Mid-Tex Gas Division Retirement 080.74341 37602 (153)
080 190 - Mid-Tex Gas Division Retirement 080.74341 38000 (70,151)
080 190 - Mid-Tex Gas Division Retirement 080.74343 37601 (17,950)
080 190 - Mid-Tex Gas Division Retirement 080.74343 37602 (322)
080 190 - Mid-Tex Gas Division Retirement 080.74343 38000 (20,426)
080 190 - Mid-Tex Gas Division Retirement 080.74344 37601 (2,833)
080 190 - Mid-Tex Gas Division Retirement 080.74344 38000 (16,102)
080 190 - Mid-Tex Gas Division Retirement 080.74345 37601 (2,114)
080 190 - Mid-Tex Gas Division Retirement 080.74345 37602 (3,199)
080 190 - Mid-Tex Gas Division Retirement 080.74345 38000 (2,992)
080 190 - Mid-Tex Gas Division Retirement 080.74346 37601 (4,805)
080 190 - Mid-Tex Gas Division Retirement 080.74346 38000 (74,000)
080 190 - Mid-Tex Gas Division Retirement 080.74347 37601 (4,569)
080 190 - Mid-Tex Gas Division Retirement 080.74347 38000 (50,324)
080 190 - Mid-Tex Gas Division Retirement 080.74348 37601 (1,465)
080 190 - Mid-Tex Gas Division Retirement 080.74348 37602 (168)
080 190 - Mid-Tex Gas Division Retirement 080.74348 38000 (29,501)
080 190 - Mid-Tex Gas Division Retirement 080.74349 37601 (1,765)
080 190 - Mid-Tex Gas Division Retirement 080.74349 38000 (42,364)
080 190 - Mid-Tex Gas Division Retirement 080.74353 37601 (119,335)
080 190 - Mid-Tex Gas Division Retirement 080.74353 37602 (5,976)
080 190 - Mid-Tex Gas Division Retirement 080.74353 38000 (4,748)
080 190 - Mid-Tex Gas Division Retirement 080.74356 37601 (287,362)
080 190 - Mid-Tex Gas Division Retirement 080.74356 38000 (914)
080 190 - Mid-Tex Gas Division Retirement 080.74362 37601 1,161
080 190 - Mid-Tex Gas Division Retirement 080.74362 37602 2,705
080 190 - Mid-Tex Gas Division Retirement 080.74362 38000 (5,281)
080 190 - Mid-Tex Gas Division Retirement 080.74386 37601 (5,571)
080 190 - Mid-Tex Gas Division Retirement 080.74386 38000 (6,584)
080 190 - Mid-Tex Gas Division Retirement 080.74402 37601 (2,132)
080 190 - Mid-Tex Gas Division Retirement 080.74402 37602 (991)
080 190 - Mid-Tex Gas Division Retirement 080.74402 38000 (6,903)
080 190 - Mid-Tex Gas Division Retirement 080.74404 37601 (1,358)
080 190 - Mid-Tex Gas Division Retirement 080.74404 37602 (661)
080 190 - Mid-Tex Gas Division Retirement 080.74404 38000 (3,301)
080 190 - Mid-Tex Gas Division Retirement 080.74408 38000 (462)
080 190 - Mid-Tex Gas Division Retirement 080.74410 37601 (19,064)
080 190 - Mid-Tex Gas Division Retirement 080.74410 37602 (38)
080 190 - Mid-Tex Gas Division Retirement 080.74410 38000 (16,080)
080 190 - Mid-Tex Gas Division Retirement 080.74415 37601 (16,647)
080 190 - Mid-Tex Gas Division Retirement 080.74415 38000 (7,135)
080 190 - Mid-Tex Gas Division Retirement 080.74416 37601 (8,556)
080 190 - Mid-Tex Gas Division Retirement 080.74416 38000 (36,028)
080 190 - Mid-Tex Gas Division Retirement 080.74417 37601 (11,337)
080 190 - Mid-Tex Gas Division Retirement 080.74417 38000 (6,427)
080 190 - Mid-Tex Gas Division Retirement 080.74418 37601 (38,856)
080 190 - Mid-Tex Gas Division Retirement 080.74418 38000 (6,378)
080 190 - Mid-Tex Gas Division Retirement 080.74419 37601 (18,653)
080 190 - Mid-Tex Gas Division Retirement 080.74419 38000 (19,836)
080 190 - Mid-Tex Gas Division Retirement 080.74421 37601 (24,463)
080 190 - Mid-Tex Gas Division Retirement 080.74421 38000 (2,154)
080 190 - Mid-Tex Gas Division Retirement 080.74422 37601 (22,261)
080 190 - Mid-Tex Gas Division Retirement 080.74422 38000 (18,282)
080 190 - Mid-Tex Gas Division Retirement 080.74425 37601 (7,386)
080 190 - Mid-Tex Gas Division Retirement 080.74425 38000 (1,475)
080 190 - Mid-Tex Gas Division Retirement 080.74430 37601 (3,784)
080 190 - Mid-Tex Gas Division Retirement 080.74430 38000 (119)
080 190 - Mid-Tex Gas Division Retirement 080.74433 37601 (120,160)
080 190 - Mid-Tex Gas Division Retirement 080.74433 37602 (102)
080 190 - Mid-Tex Gas Division Retirement 080.74433 38000 (11,887)
080 190 - Mid-Tex Gas Division Retirement 080.74435 37601 35
080 190 - Mid-Tex Gas Division Retirement 080.74435 38000 (1,110)
080 190 - Mid-Tex Gas Division Retirement 080.74439 37601 (21,399)
080 190 - Mid-Tex Gas Division Retirement 080.74439 38000 (989)
080 190 - Mid-Tex Gas Division Retirement 080.74440 37601 (17,698)
080 190 - Mid-Tex Gas Division Retirement 080.74440 37602 (2,848)
080 190 - Mid-Tex Gas Division Retirement 080.74440 38000 (496)
080 190 - Mid-Tex Gas Division Retirement 080.74441 37601 (2,663)
080 190 - Mid-Tex Gas Division Retirement 080.74441 37602 (2,224)
080 190 - Mid-Tex Gas Division Retirement 080.74441 38000 (9,717)
080 190 - Mid-Tex Gas Division Retirement 080.74442 37601 (5,374)
080 190 - Mid-Tex Gas Division Retirement 080.74442 37602 (627)
080 190 - Mid-Tex Gas Division Retirement 080.74442 38000 (2,345)
080 190 - Mid-Tex Gas Division Retirement 080.74443 37601 44,317
080 190 - Mid-Tex Gas Division Retirement 080.74443 37602 4
080 190 - Mid-Tex Gas Division Retirement 080.74443 38000 (13,698)
080 190 - Mid-Tex Gas Division Retirement 080.74450 37601 (1,132)
080 190 - Mid-Tex Gas Division Retirement 080.74450 38000 (3,968)
MTX Retirements by FERC
Page 11 of 30
557
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.74454 37601 (2,662)
080 190 - Mid-Tex Gas Division Retirement 080.74454 38000 (40,828)
080 190 - Mid-Tex Gas Division Retirement 080.74457 37602 78
080 190 - Mid-Tex Gas Division Retirement 080.74457 38000 (80)
080 190 - Mid-Tex Gas Division Retirement 080.74458 37601 (2,688)
080 190 - Mid-Tex Gas Division Retirement 080.74458 37602 (778)
080 190 - Mid-Tex Gas Division Retirement 080.74458 38000 (19,917)
080 190 - Mid-Tex Gas Division Retirement 080.74459 37601 (23)
080 190 - Mid-Tex Gas Division Retirement 080.74466 37601 (6,975)
080 190 - Mid-Tex Gas Division Retirement 080.74466 37602 (15,032)
080 190 - Mid-Tex Gas Division Retirement 080.74466 38000 (4,211)
080 190 - Mid-Tex Gas Division Retirement 080.74471 37601 (165,756)
080 190 - Mid-Tex Gas Division Retirement 080.74471 38000 (7,582)
080 190 - Mid-Tex Gas Division Retirement 080.74475 37601 (1,965)
080 190 - Mid-Tex Gas Division Retirement 080.74475 37602 (1,642)
080 190 - Mid-Tex Gas Division Retirement 080.74475 38000 (12,292)
080 190 - Mid-Tex Gas Division Retirement 080.74477 38000 (101)
080 190 - Mid-Tex Gas Division Retirement 080.74490 37601 (3,243)
080 190 - Mid-Tex Gas Division Retirement 080.74490 37602 (2,852)
080 190 - Mid-Tex Gas Division Retirement 080.74490 38000 (3,403)
080 190 - Mid-Tex Gas Division Retirement 080.74491 37602 94
080 190 - Mid-Tex Gas Division Retirement 080.74501 37601 (1,241)
080 190 - Mid-Tex Gas Division Retirement 080.74501 37602 7,902
080 190 - Mid-Tex Gas Division Retirement 080.74511 37601 (43,419)
080 190 - Mid-Tex Gas Division Retirement 080.74511 38000 (3,832)
080 190 - Mid-Tex Gas Division Retirement 080.74514 37601 (16,974)
080 190 - Mid-Tex Gas Division Retirement 080.74514 37602 (463)
080 190 - Mid-Tex Gas Division Retirement 080.74514 38000 (8,239)
080 190 - Mid-Tex Gas Division Retirement 080.74515 37601 (15,930)
080 190 - Mid-Tex Gas Division Retirement 080.74515 38000 (8,495)
080 190 - Mid-Tex Gas Division Retirement 080.74532 37601 (68,378)
080 190 - Mid-Tex Gas Division Retirement 080.74532 38000 (12,405)
080 190 - Mid-Tex Gas Division Retirement 080.74535 37601 (1,551)
080 190 - Mid-Tex Gas Division Retirement 080.74535 37800 (25,466)
080 190 - Mid-Tex Gas Division Retirement 080.74539 37601 (3,288,679)
080 190 - Mid-Tex Gas Division Retirement 080.74545 37601 (7,537)
080 190 - Mid-Tex Gas Division Retirement 080.74545 37602 (4,047)
080 190 - Mid-Tex Gas Division Retirement 080.74545 38000 (11,559)
080 190 - Mid-Tex Gas Division Retirement 080.74553 37601 (10,419)
080 190 - Mid-Tex Gas Division Retirement 080.74556 37601 940
080 190 - Mid-Tex Gas Division Retirement 080.74556 37602 (33)
080 190 - Mid-Tex Gas Division Retirement 080.74556 38000 (2,224)
080 190 - Mid-Tex Gas Division Retirement 080.74559 37601 111
080 190 - Mid-Tex Gas Division Retirement 080.74559 37602 (293)
080 190 - Mid-Tex Gas Division Retirement 080.74559 38000 1,603
080 190 - Mid-Tex Gas Division Retirement 080.74565 37601 (2,184)
080 190 - Mid-Tex Gas Division Retirement 080.74568 37601 (2,175)
080 190 - Mid-Tex Gas Division Retirement 080.74568 37602 (6,825)
080 190 - Mid-Tex Gas Division Retirement 080.74568 38000 (18,620)
080 190 - Mid-Tex Gas Division Retirement 080.74571 37601 (18,620)
080 190 - Mid-Tex Gas Division Retirement 080.74571 37602 (232)
080 190 - Mid-Tex Gas Division Retirement 080.74571 37800 (19,536)
080 190 - Mid-Tex Gas Division Retirement 080.74571 38000 (78)
080 190 - Mid-Tex Gas Division Retirement 080.74572 37601 (5,619)
080 190 - Mid-Tex Gas Division Retirement 080.74572 37602 (104)
080 190 - Mid-Tex Gas Division Retirement 080.74572 37800 (10,918)
080 190 - Mid-Tex Gas Division Retirement 080.74572 38000 (78)
080 190 - Mid-Tex Gas Division Retirement 080.74575 37601 (123,210)
080 190 - Mid-Tex Gas Division Retirement 080.74575 37602 (32,906)
080 190 - Mid-Tex Gas Division Retirement 080.74575 37800 (10,488)
080 190 - Mid-Tex Gas Division Retirement 080.74575 38000 (749)
080 190 - Mid-Tex Gas Division Retirement 080.74580 37602 673
080 190 - Mid-Tex Gas Division Retirement 080.74582 37601 (661)
080 190 - Mid-Tex Gas Division Retirement 080.74582 37602 (835)
080 190 - Mid-Tex Gas Division Retirement 080.74582 37800 (2,202)
080 190 - Mid-Tex Gas Division Retirement 080.74583 37601 (71)
080 190 - Mid-Tex Gas Division Retirement 080.74583 37800 (16,758)
080 190 - Mid-Tex Gas Division Retirement 080.74586 37602 (338)
080 190 - Mid-Tex Gas Division Retirement 080.74586 37800 (48,827)
080 190 - Mid-Tex Gas Division Retirement 080.74591 37601 (45)
080 190 - Mid-Tex Gas Division Retirement 080.74591 37602 (2,450)
080 190 - Mid-Tex Gas Division Retirement 080.74591 37800 (27,442)
080 190 - Mid-Tex Gas Division Retirement 080.74591 38000 (1,807)
080 190 - Mid-Tex Gas Division Retirement 080.74592 37601 (625)
080 190 - Mid-Tex Gas Division Retirement 080.74592 37602 (9,745)
080 190 - Mid-Tex Gas Division Retirement 080.74592 37800 (2,039)
080 190 - Mid-Tex Gas Division Retirement 080.74592 38000 (1,357)
080 190 - Mid-Tex Gas Division Retirement 080.74599 37601 (1,049)
080 190 - Mid-Tex Gas Division Retirement 080.74599 37602 (86)
080 190 - Mid-Tex Gas Division Retirement 080.74599 37800 (2,173)
080 190 - Mid-Tex Gas Division Retirement 080.74599 38000 (903)
080 190 - Mid-Tex Gas Division Retirement 080.74601 37601 (130)
080 190 - Mid-Tex Gas Division Retirement 080.74601 37602 (242)
080 190 - Mid-Tex Gas Division Retirement 080.74601 38000 5,311
080 190 - Mid-Tex Gas Division Retirement 080.74603 37601 (684)
080 190 - Mid-Tex Gas Division Retirement 080.74603 37602 (242)
080 190 - Mid-Tex Gas Division Retirement 080.74603 37800 (1,324)
080 190 - Mid-Tex Gas Division Retirement 080.74604 37601 (80)
080 190 - Mid-Tex Gas Division Retirement 080.74604 37800 (3,191)
080 190 - Mid-Tex Gas Division Retirement 080.74606 37601 (223)
080 190 - Mid-Tex Gas Division Retirement 080.74606 37602 (291)
080 190 - Mid-Tex Gas Division Retirement 080.74606 37800 (30,181)
080 190 - Mid-Tex Gas Division Retirement 080.74606 38000 (284)
080 190 - Mid-Tex Gas Division Retirement 080.74609 37601 (1,224)
080 190 - Mid-Tex Gas Division Retirement 080.74609 37602 (77)
080 190 - Mid-Tex Gas Division Retirement 080.74609 37800 (1,511)
080 190 - Mid-Tex Gas Division Retirement 080.74609 38000 (259)
080 190 - Mid-Tex Gas Division Retirement 080.74610 37602 (67)
080 190 - Mid-Tex Gas Division Retirement 080.74610 37800 (49,136)
080 190 - Mid-Tex Gas Division Retirement 080.74615 38000 (3,369)
080 190 - Mid-Tex Gas Division Retirement 080.74617 37601 (1,388)
080 190 - Mid-Tex Gas Division Retirement 080.74617 37602 (303)
080 190 - Mid-Tex Gas Division Retirement 080.74617 38000 (6)
080 190 - Mid-Tex Gas Division Retirement 080.74623 37601 (3,523)
080 190 - Mid-Tex Gas Division Retirement 080.74623 38000 (1,011)
080 190 - Mid-Tex Gas Division Retirement 080.74625 37601 939
080 190 - Mid-Tex Gas Division Retirement 080.74625 37602 (1,014)
MTX Retirements by FERC
Page 12 of 30
558
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.74625 38000 3,885
080 190 - Mid-Tex Gas Division Retirement 080.74631 38000 (658)
080 190 - Mid-Tex Gas Division Retirement 080.74633 37601 (91)
080 190 - Mid-Tex Gas Division Retirement 080.74633 37602 (10)
080 190 - Mid-Tex Gas Division Retirement 080.74636 37601 (16,874)
080 190 - Mid-Tex Gas Division Retirement 080.74636 38000 (575)
080 190 - Mid-Tex Gas Division Retirement 080.74642 37601 (11,542)
080 190 - Mid-Tex Gas Division Retirement 080.74642 37602 (890)
080 190 - Mid-Tex Gas Division Retirement 080.74642 38000 (7,147)
080 190 - Mid-Tex Gas Division Retirement 080.74643 37601 (561)
080 190 - Mid-Tex Gas Division Retirement 080.74643 37602 (429)
080 190 - Mid-Tex Gas Division Retirement 080.74643 38000 (752)
080 190 - Mid-Tex Gas Division Retirement 080.74647 37601 (2,115)
080 190 - Mid-Tex Gas Division Retirement 080.74647 38000 (13,337)
080 190 - Mid-Tex Gas Division Retirement 080.74648 37601 (7,487)
080 190 - Mid-Tex Gas Division Retirement 080.74648 37602 (5,828)
080 190 - Mid-Tex Gas Division Retirement 080.74648 38000 (6,606)
080 190 - Mid-Tex Gas Division Retirement 080.74650 37601 (10,357)
080 190 - Mid-Tex Gas Division Retirement 080.74650 37602 (13,000)
080 190 - Mid-Tex Gas Division Retirement 080.74650 38000 (1,176)
080 190 - Mid-Tex Gas Division Retirement 080.74657 37601 (911)
080 190 - Mid-Tex Gas Division Retirement 080.74657 38000 (23,122)
080 190 - Mid-Tex Gas Division Retirement 080.74664 37601 (15,382)
080 190 - Mid-Tex Gas Division Retirement 080.74664 38000 (3,588)
080 190 - Mid-Tex Gas Division Retirement 080.74665 37601 (9,125)
080 190 - Mid-Tex Gas Division Retirement 080.74665 38000 (9,666)
080 190 - Mid-Tex Gas Division Retirement 080.74666 37601 (5,770)
080 190 - Mid-Tex Gas Division Retirement 080.74666 38000 (14,832)
080 190 - Mid-Tex Gas Division Retirement 080.74669 37601 (378)
080 190 - Mid-Tex Gas Division Retirement 080.74669 37602 (3,315)
080 190 - Mid-Tex Gas Division Retirement 080.74669 38000 (7,943)
080 190 - Mid-Tex Gas Division Retirement 080.74671 37601 (2,011)
080 190 - Mid-Tex Gas Division Retirement 080.74671 37602 (2,389)
080 190 - Mid-Tex Gas Division Retirement 080.74671 38000 (6,642)
080 190 - Mid-Tex Gas Division Retirement 080.74672 37601 (1,474)
080 190 - Mid-Tex Gas Division Retirement 080.74672 37602 (5,619)
080 190 - Mid-Tex Gas Division Retirement 080.74672 38000 (25,752)
080 190 - Mid-Tex Gas Division Retirement 080.74673 37601 (6,187)
080 190 - Mid-Tex Gas Division Retirement 080.74673 37602 (965)
080 190 - Mid-Tex Gas Division Retirement 080.74673 38000 (1,901)
080 190 - Mid-Tex Gas Division Retirement 080.74674 37601 (5,780)
080 190 - Mid-Tex Gas Division Retirement 080.74674 37602 (482)
080 190 - Mid-Tex Gas Division Retirement 080.74674 38000 (25,512)
080 190 - Mid-Tex Gas Division Retirement 080.74675 37601 (22,982)
080 190 - Mid-Tex Gas Division Retirement 080.74675 37602 (145)
080 190 - Mid-Tex Gas Division Retirement 080.74675 38000 (12,537)
080 190 - Mid-Tex Gas Division Retirement 080.74676 37601 (9,505)
080 190 - Mid-Tex Gas Division Retirement 080.74676 38000 (21,670)
080 190 - Mid-Tex Gas Division Retirement 080.74677 37601 (34,587)
080 190 - Mid-Tex Gas Division Retirement 080.74677 38000 (24,918)
080 190 - Mid-Tex Gas Division Retirement 080.74678 37601 (53,458)
080 190 - Mid-Tex Gas Division Retirement 080.74678 38000 (52,776)
080 190 - Mid-Tex Gas Division Retirement 080.74679 37601 (63,565)
080 190 - Mid-Tex Gas Division Retirement 080.74679 38000 (9,894)
080 190 - Mid-Tex Gas Division Retirement 080.74680 37601 (4,931)
080 190 - Mid-Tex Gas Division Retirement 080.74680 38000 (26,530)
080 190 - Mid-Tex Gas Division Retirement 080.74681 37601 (3,183)
080 190 - Mid-Tex Gas Division Retirement 080.74681 37602 (263)
080 190 - Mid-Tex Gas Division Retirement 080.74681 38000 (19,660)
080 190 - Mid-Tex Gas Division Retirement 080.74682 37601 (29,540)
080 190 - Mid-Tex Gas Division Retirement 080.74682 38000 (8,683)
080 190 - Mid-Tex Gas Division Retirement 080.74684 37601 (7,107)
080 190 - Mid-Tex Gas Division Retirement 080.74684 38000 (23,634)
080 190 - Mid-Tex Gas Division Retirement 080.74692 37602 (998)
080 190 - Mid-Tex Gas Division Retirement 080.74693 37601 (6,903)
080 190 - Mid-Tex Gas Division Retirement 080.74693 38000 (18,238)
080 190 - Mid-Tex Gas Division Retirement 080.74703 37601 35,381
080 190 - Mid-Tex Gas Division Retirement 080.74703 37602 14
080 190 - Mid-Tex Gas Division Retirement 080.74703 38000 (11,489)
080 190 - Mid-Tex Gas Division Retirement 080.74704 37601 (188)
080 190 - Mid-Tex Gas Division Retirement 080.74704 37800 (22,576)
080 190 - Mid-Tex Gas Division Retirement 080.74705 37601 (667)
080 190 - Mid-Tex Gas Division Retirement 080.74705 37602 (36)
080 190 - Mid-Tex Gas Division Retirement 080.74705 37800 (30,060)
080 190 - Mid-Tex Gas Division Retirement 080.74706 37601 (32)
080 190 - Mid-Tex Gas Division Retirement 080.74706 37800 (8,948)
080 190 - Mid-Tex Gas Division Retirement 080.74709 37601 (37,216)
080 190 - Mid-Tex Gas Division Retirement 080.74709 37602 (174)
080 190 - Mid-Tex Gas Division Retirement 080.74709 38000 (18,240)
080 190 - Mid-Tex Gas Division Retirement 080.74710 37602 (421)
080 190 - Mid-Tex Gas Division Retirement 080.74715 39200 (49,238)
080 190 - Mid-Tex Gas Division Retirement 080.74715 39400 (4,914)
080 190 - Mid-Tex Gas Division Retirement 080.74719 37601 (402)
080 190 - Mid-Tex Gas Division Retirement 080.74719 37602 (5,982)
080 190 - Mid-Tex Gas Division Retirement 080.74719 37800 (68,862)
080 190 - Mid-Tex Gas Division Retirement 080.74719 38000 (3,086)
080 190 - Mid-Tex Gas Division Retirement 080.74726 37601 228
080 190 - Mid-Tex Gas Division Retirement 080.74726 37602 (13,036)
080 190 - Mid-Tex Gas Division Retirement 080.74739 37601 (5,280)
080 190 - Mid-Tex Gas Division Retirement 080.74739 38000 (805)
080 190 - Mid-Tex Gas Division Retirement 080.74746 37602 (13,800)
080 190 - Mid-Tex Gas Division Retirement 080.74747 37601 (890)
080 190 - Mid-Tex Gas Division Retirement 080.74747 37602 (423)
080 190 - Mid-Tex Gas Division Retirement 080.74747 38000 (19,509)
080 190 - Mid-Tex Gas Division Retirement 080.74752 38000 2,866
080 190 - Mid-Tex Gas Division Retirement 080.74753 37601 (157,999)
080 190 - Mid-Tex Gas Division Retirement 080.74753 37602 (25,144)
080 190 - Mid-Tex Gas Division Retirement 080.74753 38000 (17,657)
080 190 - Mid-Tex Gas Division Retirement 080.74756 37601 (31,654)
080 190 - Mid-Tex Gas Division Retirement 080.74756 37602 (1,081)
080 190 - Mid-Tex Gas Division Retirement 080.74756 37800 (114,068)
080 190 - Mid-Tex Gas Division Retirement 080.74757 37601 (791)
080 190 - Mid-Tex Gas Division Retirement 080.74757 37602 (22,524)
080 190 - Mid-Tex Gas Division Retirement 080.74757 38000 (3,578)
080 190 - Mid-Tex Gas Division Retirement 080.74759 37601 689
080 190 - Mid-Tex Gas Division Retirement 080.74759 37602 (1,268)
080 190 - Mid-Tex Gas Division Retirement 080.74759 38000 (2,896)
MTX Retirements by FERC
Page 13 of 30
559
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.74762 38000 (3,652)
080 190 - Mid-Tex Gas Division Retirement 080.74771 37601 (29)
080 190 - Mid-Tex Gas Division Retirement 080.74773 37800 (195,493)
080 190 - Mid-Tex Gas Division Retirement 080.74775 37601 (4,529)
080 190 - Mid-Tex Gas Division Retirement 080.74775 37800 (36,307)
080 190 - Mid-Tex Gas Division Retirement 080.74776 37601 (96,054)
080 190 - Mid-Tex Gas Division Retirement 080.74776 37800 (134,920)
080 190 - Mid-Tex Gas Division Retirement 080.74778 38000 (9,915)
080 190 - Mid-Tex Gas Division Retirement 080.74779 37602 (653)
080 190 - Mid-Tex Gas Division Retirement 080.74779 38000 (32,194)
080 190 - Mid-Tex Gas Division Retirement 080.74780 37601 (9,949)
080 190 - Mid-Tex Gas Division Retirement 080.74780 37800 (17,650)
080 190 - Mid-Tex Gas Division Retirement 080.74782 37601 (5,939)
080 190 - Mid-Tex Gas Division Retirement 080.74782 37602 (852)
080 190 - Mid-Tex Gas Division Retirement 080.74782 38000 (10,222)
080 190 - Mid-Tex Gas Division Retirement 080.74783 37601 (1,471)
080 190 - Mid-Tex Gas Division Retirement 080.74783 37800 (32,257)
080 190 - Mid-Tex Gas Division Retirement 080.74786 37602 (1,013)
080 190 - Mid-Tex Gas Division Retirement 080.74786 38000 (1,801)
080 190 - Mid-Tex Gas Division Retirement 080.74794 37601 (8,111)
080 190 - Mid-Tex Gas Division Retirement 080.74794 38000 (16,366)
080 190 - Mid-Tex Gas Division Retirement 080.74799 37601 (3,906)
080 190 - Mid-Tex Gas Division Retirement 080.74799 37602 (670)
080 190 - Mid-Tex Gas Division Retirement 080.74799 38000 (16,365)
080 190 - Mid-Tex Gas Division Retirement 080.74807 37602 360
080 190 - Mid-Tex Gas Division Retirement 080.74808 37601 (184)
080 190 - Mid-Tex Gas Division Retirement 080.74808 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.74809 37601 (1,944)
080 190 - Mid-Tex Gas Division Retirement 080.74809 37602 (15)
080 190 - Mid-Tex Gas Division Retirement 080.74809 38000 (1,031)
080 190 - Mid-Tex Gas Division Retirement 080.74822 37601 (1,051)
080 190 - Mid-Tex Gas Division Retirement 080.74822 37602 (18,228)
080 190 - Mid-Tex Gas Division Retirement 080.74825 37602 (30,396)
080 190 - Mid-Tex Gas Division Retirement 080.74825 38000 (1,559)
080 190 - Mid-Tex Gas Division Retirement 080.74828 37602 (62)
080 190 - Mid-Tex Gas Division Retirement 080.74828 37800 (798)
080 190 - Mid-Tex Gas Division Retirement 080.74830 37601 (22)
080 190 - Mid-Tex Gas Division Retirement 080.74830 37602 (77)
080 190 - Mid-Tex Gas Division Retirement 080.74830 37800 (2,380)
080 190 - Mid-Tex Gas Division Retirement 080.74831 37602 (201)
080 190 - Mid-Tex Gas Division Retirement 080.74831 37800 (1,922)
080 190 - Mid-Tex Gas Division Retirement 080.74835 37601 (33)
080 190 - Mid-Tex Gas Division Retirement 080.74835 37800 (1,084)
080 190 - Mid-Tex Gas Division Retirement 080.74839 37601 (10)
080 190 - Mid-Tex Gas Division Retirement 080.74839 37602 (38)
080 190 - Mid-Tex Gas Division Retirement 080.74839 37800 (2,309)
080 190 - Mid-Tex Gas Division Retirement 080.74845 37601 (3,269)
080 190 - Mid-Tex Gas Division Retirement 080.74845 38000 (1,388)
080 190 - Mid-Tex Gas Division Retirement 080.74847 37601 (11,746)
080 190 - Mid-Tex Gas Division Retirement 080.74847 37602 (905)
080 190 - Mid-Tex Gas Division Retirement 080.74847 38000 (3,875)
080 190 - Mid-Tex Gas Division Retirement 080.74854 37601 (2,543)
080 190 - Mid-Tex Gas Division Retirement 080.74854 38000 (31,880)
080 190 - Mid-Tex Gas Division Retirement 080.74861 37602 19
080 190 - Mid-Tex Gas Division Retirement 080.74863 37602 12,643
080 190 - Mid-Tex Gas Division Retirement 080.74866 37601 (296)
080 190 - Mid-Tex Gas Division Retirement 080.74866 37800 (12,928)
080 190 - Mid-Tex Gas Division Retirement 080.74867 37601 (950)
080 190 - Mid-Tex Gas Division Retirement 080.74867 37602 (538)
080 190 - Mid-Tex Gas Division Retirement 080.74867 37800 (2,769)
080 190 - Mid-Tex Gas Division Retirement 080.74867 38000 (3,312)
080 190 - Mid-Tex Gas Division Retirement 080.74868 37601 (696)
080 190 - Mid-Tex Gas Division Retirement 080.74868 37602 (2,455)
080 190 - Mid-Tex Gas Division Retirement 080.74868 37800 (16,425)
080 190 - Mid-Tex Gas Division Retirement 080.74868 38000 (373)
080 190 - Mid-Tex Gas Division Retirement 080.74869 37601 (188)
080 190 - Mid-Tex Gas Division Retirement 080.74869 37800 (4,445)
080 190 - Mid-Tex Gas Division Retirement 080.74873 37601 (163)
080 190 - Mid-Tex Gas Division Retirement 080.74873 37602 (31)
080 190 - Mid-Tex Gas Division Retirement 080.74873 37800 (31,927)
080 190 - Mid-Tex Gas Division Retirement 080.74874 37601 (202)
080 190 - Mid-Tex Gas Division Retirement 080.74874 37602 (73)
080 190 - Mid-Tex Gas Division Retirement 080.74874 37800 (3,967)
080 190 - Mid-Tex Gas Division Retirement 080.74875 37601 (179)
080 190 - Mid-Tex Gas Division Retirement 080.74875 37602 (42)
080 190 - Mid-Tex Gas Division Retirement 080.74875 37800 (12,450)
080 190 - Mid-Tex Gas Division Retirement 080.74877 37601 (80)
080 190 - Mid-Tex Gas Division Retirement 080.74877 37602 (128)
080 190 - Mid-Tex Gas Division Retirement 080.74877 37800 (21,428)
080 190 - Mid-Tex Gas Division Retirement 080.74879 37601 (72)
080 190 - Mid-Tex Gas Division Retirement 080.74879 37602 (1,057)
080 190 - Mid-Tex Gas Division Retirement 080.74879 37800 (24,533)
080 190 - Mid-Tex Gas Division Retirement 080.74879 38000 (313)
080 190 - Mid-Tex Gas Division Retirement 080.74881 37601 (43,861)
080 190 - Mid-Tex Gas Division Retirement 080.74881 37602 (407)
080 190 - Mid-Tex Gas Division Retirement 080.74881 38000 (3,538)
080 190 - Mid-Tex Gas Division Retirement 080.74888 37601 (36,513)
080 190 - Mid-Tex Gas Division Retirement 080.74889 37602 (50,402)
080 190 - Mid-Tex Gas Division Retirement 080.74893 37601 (2,417)
080 190 - Mid-Tex Gas Division Retirement 080.74893 37602 (876)
080 190 - Mid-Tex Gas Division Retirement 080.74893 38000 (2,135)
080 190 - Mid-Tex Gas Division Retirement 080.74898 37601 (91,226)
080 190 - Mid-Tex Gas Division Retirement 080.74898 37602 (4,601)
080 190 - Mid-Tex Gas Division Retirement 080.74898 38000 (13,989)
080 190 - Mid-Tex Gas Division Retirement 080.74905 37602 (684)
080 190 - Mid-Tex Gas Division Retirement 080.74905 38000 (29,387)
080 190 - Mid-Tex Gas Division Retirement 080.74906 37601 (1,907)
080 190 - Mid-Tex Gas Division Retirement 080.74906 37602 (3,828)
080 190 - Mid-Tex Gas Division Retirement 080.74906 38000 (4,783)
080 190 - Mid-Tex Gas Division Retirement 080.74909 37601 (3,105)
080 190 - Mid-Tex Gas Division Retirement 080.74909 38000 (7,076)
080 190 - Mid-Tex Gas Division Retirement 080.74913 37602 (427)
080 190 - Mid-Tex Gas Division Retirement 080.74924 37602 (464)
080 190 - Mid-Tex Gas Division Retirement 080.74925 37601 (2,039)
080 190 - Mid-Tex Gas Division Retirement 080.74925 38000 (1,859)
080 190 - Mid-Tex Gas Division Retirement 080.74930 37601 (14,394)
080 190 - Mid-Tex Gas Division Retirement 080.74930 37602 (20)
MTX Retirements by FERC
Page 14 of 30
560
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.74937 37601 3,789
080 190 - Mid-Tex Gas Division Retirement 080.74937 37602 (2,046)
080 190 - Mid-Tex Gas Division Retirement 080.74937 38000 (679)
080 190 - Mid-Tex Gas Division Retirement 080.74939 37601 (309)
080 190 - Mid-Tex Gas Division Retirement 080.74939 37602 (2,601)
080 190 - Mid-Tex Gas Division Retirement 080.74946 37602 (32)
080 190 - Mid-Tex Gas Division Retirement 080.74956 37601 (4,543)
080 190 - Mid-Tex Gas Division Retirement 080.74958 37601 (3,106)
080 190 - Mid-Tex Gas Division Retirement 080.74979 37602 (7,163)
080 190 - Mid-Tex Gas Division Retirement 080.74980 37601 (849)
080 190 - Mid-Tex Gas Division Retirement 080.74981 37601 (6,577)
080 190 - Mid-Tex Gas Division Retirement 080.74981 38000 (18,104)
080 190 - Mid-Tex Gas Division Retirement 080.74983 37601 (2,352)
080 190 - Mid-Tex Gas Division Retirement 080.74983 38000 (4,931)
080 190 - Mid-Tex Gas Division Retirement 080.74984 37601 (3,592)
080 190 - Mid-Tex Gas Division Retirement 080.74984 37602 (1,512)
080 190 - Mid-Tex Gas Division Retirement 080.74984 38000 (27,284)
080 190 - Mid-Tex Gas Division Retirement 080.74985 37800 (4,628)
080 190 - Mid-Tex Gas Division Retirement 080.74986 38000 347
080 190 - Mid-Tex Gas Division Retirement 080.74988 38000 (2,703)
080 190 - Mid-Tex Gas Division Retirement 080.74993 37601 (21,941)
080 190 - Mid-Tex Gas Division Retirement 080.74993 37602 (114)
080 190 - Mid-Tex Gas Division Retirement 080.74993 38000 (11,295)
080 190 - Mid-Tex Gas Division Retirement 080.74996 37601 (1,385)
080 190 - Mid-Tex Gas Division Retirement 080.74996 37602 (9,719)
080 190 - Mid-Tex Gas Division Retirement 080.74996 38000 (6,416)
080 190 - Mid-Tex Gas Division Retirement 080.75025 37601 (4,122)
080 190 - Mid-Tex Gas Division Retirement 080.75025 38000 (424)
080 190 - Mid-Tex Gas Division Retirement 080.75029 38000 1,480
080 190 - Mid-Tex Gas Division Retirement 080.75032 37601 (4,301)
080 190 - Mid-Tex Gas Division Retirement 080.75032 38000 (3,096)
080 190 - Mid-Tex Gas Division Retirement 080.75041 38000 233
080 190 - Mid-Tex Gas Division Retirement 080.75048 37602 (19,728)
080 190 - Mid-Tex Gas Division Retirement 080.75048 38000 (22,229)
080 190 - Mid-Tex Gas Division Retirement 080.75054 37601 (245)
080 190 - Mid-Tex Gas Division Retirement 080.75054 37602 (162)
080 190 - Mid-Tex Gas Division Retirement 080.75054 38000 (254)
080 190 - Mid-Tex Gas Division Retirement 080.75058 37601 (44,838)
080 190 - Mid-Tex Gas Division Retirement 080.75059 37601 (5,040)
080 190 - Mid-Tex Gas Division Retirement 080.75059 38000 (15,009)
080 190 - Mid-Tex Gas Division Retirement 080.75066 37602 36
080 190 - Mid-Tex Gas Division Retirement 080.75067 37601 (1,146)
080 190 - Mid-Tex Gas Division Retirement 080.75067 38000 (293)
080 190 - Mid-Tex Gas Division Retirement 080.75068 37601 (1,440)
080 190 - Mid-Tex Gas Division Retirement 080.75068 38000 (4,696)
080 190 - Mid-Tex Gas Division Retirement 080.75069 37601 (2,818)
080 190 - Mid-Tex Gas Division Retirement 080.75069 37602 (56)
080 190 - Mid-Tex Gas Division Retirement 080.75069 38000 (19,590)
080 190 - Mid-Tex Gas Division Retirement 080.75071 37601 (2,267)
080 190 - Mid-Tex Gas Division Retirement 080.75071 37602 (391)
080 190 - Mid-Tex Gas Division Retirement 080.75071 38000 (6,067)
080 190 - Mid-Tex Gas Division Retirement 080.75072 37601 (26,835)
080 190 - Mid-Tex Gas Division Retirement 080.75072 37602 (448)
080 190 - Mid-Tex Gas Division Retirement 080.75072 38000 (12,116)
080 190 - Mid-Tex Gas Division Retirement 080.75073 37602 (5,825)
080 190 - Mid-Tex Gas Division Retirement 080.75073 38000 (2,667)
080 190 - Mid-Tex Gas Division Retirement 080.75074 37601 2,352
080 190 - Mid-Tex Gas Division Retirement 080.75074 38000 (21,852)
080 190 - Mid-Tex Gas Division Retirement 080.75077 37601 (24)
080 190 - Mid-Tex Gas Division Retirement 080.75077 37800 (68,193)
080 190 - Mid-Tex Gas Division Retirement 080.75078 37601 (15,734)
080 190 - Mid-Tex Gas Division Retirement 080.75078 37602 (2,148)
080 190 - Mid-Tex Gas Division Retirement 080.75078 38000 (5)
080 190 - Mid-Tex Gas Division Retirement 080.75083 37602 (10,490)
080 190 - Mid-Tex Gas Division Retirement 080.75083 38000 (27,028)
080 190 - Mid-Tex Gas Division Retirement 080.75084 37601 (263,559)
080 190 - Mid-Tex Gas Division Retirement 080.75084 37800 (21,825)
080 190 - Mid-Tex Gas Division Retirement 080.75084 38100 (4,642)
080 190 - Mid-Tex Gas Division Retirement 080.75091 37601 (1,764)
080 190 - Mid-Tex Gas Division Retirement 080.75091 38000 (823)
080 190 - Mid-Tex Gas Division Retirement 080.75098 37601 (19)
080 190 - Mid-Tex Gas Division Retirement 080.75098 37602 332
080 190 - Mid-Tex Gas Division Retirement 080.75112 37601 2,195
080 190 - Mid-Tex Gas Division Retirement 080.75112 38000 608
080 190 - Mid-Tex Gas Division Retirement 080.75115 37601 (533)
080 190 - Mid-Tex Gas Division Retirement 080.75115 37602 (1,057)
080 190 - Mid-Tex Gas Division Retirement 080.75115 38000 (1,081)
080 190 - Mid-Tex Gas Division Retirement 080.75124 37601 (545)
080 190 - Mid-Tex Gas Division Retirement 080.75124 37602 (739)
080 190 - Mid-Tex Gas Division Retirement 080.75124 38000 (9,486)
080 190 - Mid-Tex Gas Division Retirement 080.75132 37601 (273)
080 190 - Mid-Tex Gas Division Retirement 080.75133 37601 (3,467)
080 190 - Mid-Tex Gas Division Retirement 080.75133 37602 (33,207)
080 190 - Mid-Tex Gas Division Retirement 080.75133 38000 (17,507)
080 190 - Mid-Tex Gas Division Retirement 080.75146 37601 (4,302)
080 190 - Mid-Tex Gas Division Retirement 080.75146 38000 (40,538)
080 190 - Mid-Tex Gas Division Retirement 080.75147 37602 (1,105)
080 190 - Mid-Tex Gas Division Retirement 080.75147 38000 (119,087)
080 190 - Mid-Tex Gas Division Retirement 080.75152 37602 (865)
080 190 - Mid-Tex Gas Division Retirement 080.75152 38000 (4,150)
080 190 - Mid-Tex Gas Division Retirement 080.75159 37601 (8,301)
080 190 - Mid-Tex Gas Division Retirement 080.75159 37602 (38,173)
080 190 - Mid-Tex Gas Division Retirement 080.75159 38000 (7,119)
080 190 - Mid-Tex Gas Division Retirement 080.75160 37601 (2,929)
080 190 - Mid-Tex Gas Division Retirement 080.75160 38000 (31,396)
080 190 - Mid-Tex Gas Division Retirement 080.75161 37601 (36,926)
080 190 - Mid-Tex Gas Division Retirement 080.75161 37602 (2,016)
080 190 - Mid-Tex Gas Division Retirement 080.75161 38000 (11,446)
080 190 - Mid-Tex Gas Division Retirement 080.75162 37602 (1,568)
080 190 - Mid-Tex Gas Division Retirement 080.75162 38000 (2,531)
080 190 - Mid-Tex Gas Division Retirement 080.75170 37800 (51,213)
080 190 - Mid-Tex Gas Division Retirement 080.75171 37601 (4,108)
080 190 - Mid-Tex Gas Division Retirement 080.75171 37602 (261)
080 190 - Mid-Tex Gas Division Retirement 080.75171 37800 (19,990)
080 190 - Mid-Tex Gas Division Retirement 080.75174 37601 (10,752)
080 190 - Mid-Tex Gas Division Retirement 080.75174 37602 (123)
080 190 - Mid-Tex Gas Division Retirement 080.75174 37800 (13,756)
MTX Retirements by FERC
Page 15 of 30
561
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.75175 37800 (17,646)
080 190 - Mid-Tex Gas Division Retirement 080.75184 37601 (511)
080 190 - Mid-Tex Gas Division Retirement 080.75184 37602 (5,494)
080 190 - Mid-Tex Gas Division Retirement 080.75184 38000 (325)
080 190 - Mid-Tex Gas Division Retirement 080.75188 37601 (1,673)
080 190 - Mid-Tex Gas Division Retirement 080.75188 38000 (7,489)
080 190 - Mid-Tex Gas Division Retirement 080.75190 37601 (1,064)
080 190 - Mid-Tex Gas Division Retirement 080.75190 37602 (2,167)
080 190 - Mid-Tex Gas Division Retirement 080.75190 38000 (12,115)
080 190 - Mid-Tex Gas Division Retirement 080.75195 37800 (23,823)
080 190 - Mid-Tex Gas Division Retirement 080.75196 37601 (16,743)
080 190 - Mid-Tex Gas Division Retirement 080.75196 37800 (28,109)
080 190 - Mid-Tex Gas Division Retirement 080.75198 37601 (2,432)
080 190 - Mid-Tex Gas Division Retirement 080.75198 37800 (64,297)
080 190 - Mid-Tex Gas Division Retirement 080.75198 38000 (88)
080 190 - Mid-Tex Gas Division Retirement 080.75199 37602 (2,174)
080 190 - Mid-Tex Gas Division Retirement 080.75199 37800 (44,626)
080 190 - Mid-Tex Gas Division Retirement 080.75200 37601 (1,181)
080 190 - Mid-Tex Gas Division Retirement 080.75200 37602 (18)
080 190 - Mid-Tex Gas Division Retirement 080.75200 37800 (2,056)
080 190 - Mid-Tex Gas Division Retirement 080.75202 37601 (222)
080 190 - Mid-Tex Gas Division Retirement 080.75202 37602 (79)
080 190 - Mid-Tex Gas Division Retirement 080.75202 37800 (13,085)
080 190 - Mid-Tex Gas Division Retirement 080.75203 37601 (12)
080 190 - Mid-Tex Gas Division Retirement 080.75203 37602 (21)
080 190 - Mid-Tex Gas Division Retirement 080.75203 37800 (72,572)
080 190 - Mid-Tex Gas Division Retirement 080.75210 37601 (14)
080 190 - Mid-Tex Gas Division Retirement 080.75210 37800 (37,967)
080 190 - Mid-Tex Gas Division Retirement 080.75211 37601 (2,579)
080 190 - Mid-Tex Gas Division Retirement 080.75211 37602 (11)
080 190 - Mid-Tex Gas Division Retirement 080.75211 37800 (64,754)
080 190 - Mid-Tex Gas Division Retirement 080.75214 37601 (161)
080 190 - Mid-Tex Gas Division Retirement 080.75214 37602 (622)
080 190 - Mid-Tex Gas Division Retirement 080.75214 37800 (23,889)
080 190 - Mid-Tex Gas Division Retirement 080.75215 37601 (22,731)
080 190 - Mid-Tex Gas Division Retirement 080.75215 37800 (32,529)
080 190 - Mid-Tex Gas Division Retirement 080.75216 37601 (26)
080 190 - Mid-Tex Gas Division Retirement 080.75216 37800 (31,308)
080 190 - Mid-Tex Gas Division Retirement 080.75219 37601 (1,287)
080 190 - Mid-Tex Gas Division Retirement 080.75219 37602 (248)
080 190 - Mid-Tex Gas Division Retirement 080.75219 38000 (28,859)
080 190 - Mid-Tex Gas Division Retirement 080.75221 37601 (3,296)
080 190 - Mid-Tex Gas Division Retirement 080.75221 37800 6,509
080 190 - Mid-Tex Gas Division Retirement 080.75227 37602 (1,268)
080 190 - Mid-Tex Gas Division Retirement 080.75227 37800 (77,896)
080 190 - Mid-Tex Gas Division Retirement 080.75228 37601 (999,066)
080 190 - Mid-Tex Gas Division Retirement 080.75228 37602 (701)
080 190 - Mid-Tex Gas Division Retirement 080.75228 38000 (840)
080 190 - Mid-Tex Gas Division Retirement 080.75236 37601 (17)
080 190 - Mid-Tex Gas Division Retirement 080.75236 37602 (1,359)
080 190 - Mid-Tex Gas Division Retirement 080.75236 37800 (4,064)
080 190 - Mid-Tex Gas Division Retirement 080.75239 37601 (6)
080 190 - Mid-Tex Gas Division Retirement 080.75239 37602 (319)
080 190 - Mid-Tex Gas Division Retirement 080.75239 37800 (14,286)
080 190 - Mid-Tex Gas Division Retirement 080.75243 37800 (36,787)
080 190 - Mid-Tex Gas Division Retirement 080.75251 37602 (127)
080 190 - Mid-Tex Gas Division Retirement 080.75251 37800 176,087
080 190 - Mid-Tex Gas Division Retirement 080.75256 37602 (130)
080 190 - Mid-Tex Gas Division Retirement 080.75256 37800 (46,362)
080 190 - Mid-Tex Gas Division Retirement 080.75259 37601 (54,539)
080 190 - Mid-Tex Gas Division Retirement 080.75259 38000 (6,992)
080 190 - Mid-Tex Gas Division Retirement 080.75260 37601 (1,130)
080 190 - Mid-Tex Gas Division Retirement 080.75261 37601 (16,888)
080 190 - Mid-Tex Gas Division Retirement 080.75261 37602 (416)
080 190 - Mid-Tex Gas Division Retirement 080.75261 38000 (17,141)
080 190 - Mid-Tex Gas Division Retirement 080.75263 37602 (3,844)
080 190 - Mid-Tex Gas Division Retirement 080.75263 38000 (485)
080 190 - Mid-Tex Gas Division Retirement 080.75276 37601 (40,087)
080 190 - Mid-Tex Gas Division Retirement 080.75276 38000 (3,588)
080 190 - Mid-Tex Gas Division Retirement 080.75278 37601 (4,287)
080 190 - Mid-Tex Gas Division Retirement 080.75278 37602 (1,041)
080 190 - Mid-Tex Gas Division Retirement 080.75278 38000 (6,139)
080 190 - Mid-Tex Gas Division Retirement 080.75279 37601 (1,816)
080 190 - Mid-Tex Gas Division Retirement 080.75279 38000 (11,662)
080 190 - Mid-Tex Gas Division Retirement 080.75280 37601 (19,889)
080 190 - Mid-Tex Gas Division Retirement 080.75280 38000 (3,097)
080 190 - Mid-Tex Gas Division Retirement 080.75281 37601 (5,357)
080 190 - Mid-Tex Gas Division Retirement 080.75281 37602 (464)
080 190 - Mid-Tex Gas Division Retirement 080.75281 38000 (11,244)
080 190 - Mid-Tex Gas Division Retirement 080.75287 38000 (828)
080 190 - Mid-Tex Gas Division Retirement 080.75301 37601 (3,236)
080 190 - Mid-Tex Gas Division Retirement 080.75301 37602 (16,603)
080 190 - Mid-Tex Gas Division Retirement 080.75313 37602 (3,317)
080 190 - Mid-Tex Gas Division Retirement 080.75314 37601 (2,790)
080 190 - Mid-Tex Gas Division Retirement 080.75314 37602 (698)
080 190 - Mid-Tex Gas Division Retirement 080.75314 38000 (601)
080 190 - Mid-Tex Gas Division Retirement 080.75315 37601 (7)
080 190 - Mid-Tex Gas Division Retirement 080.75315 37602 (754)
080 190 - Mid-Tex Gas Division Retirement 080.75315 37800 (6,442)
080 190 - Mid-Tex Gas Division Retirement 080.75321 37601 (1,272)
080 190 - Mid-Tex Gas Division Retirement 080.75321 37602 (7)
080 190 - Mid-Tex Gas Division Retirement 080.75321 37800 (68,114)
080 190 - Mid-Tex Gas Division Retirement 080.75327 37601 (559)
080 190 - Mid-Tex Gas Division Retirement 080.75327 37800 (52,918)
080 190 - Mid-Tex Gas Division Retirement 080.75328 37601 (1,968)
080 190 - Mid-Tex Gas Division Retirement 080.75341 37601 (2,128)
080 190 - Mid-Tex Gas Division Retirement 080.75341 37602 (2,076)
080 190 - Mid-Tex Gas Division Retirement 080.75341 38000 (19,949)
080 190 - Mid-Tex Gas Division Retirement 080.75342 37601 (2,455)
080 190 - Mid-Tex Gas Division Retirement 080.75342 37602 (967)
080 190 - Mid-Tex Gas Division Retirement 080.75342 37800 (9,581)
080 190 - Mid-Tex Gas Division Retirement 080.75342 38000 (2,575)
080 190 - Mid-Tex Gas Division Retirement 080.75343 37601 (1,168)
080 190 - Mid-Tex Gas Division Retirement 080.75343 38000 (6,341)
080 190 - Mid-Tex Gas Division Retirement 080.75354 37601 (998)
080 190 - Mid-Tex Gas Division Retirement 080.75354 37602 (12)
080 190 - Mid-Tex Gas Division Retirement 080.75354 38000 (6,603)
MTX Retirements by FERC
Page 16 of 30
562
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.75356 37601 (1,899)
080 190 - Mid-Tex Gas Division Retirement 080.75356 38000 (15,099)
080 190 - Mid-Tex Gas Division Retirement 080.75360 37602 (1,032)
080 190 - Mid-Tex Gas Division Retirement 080.75367 37601 (47)
080 190 - Mid-Tex Gas Division Retirement 080.75367 37602 (292)
080 190 - Mid-Tex Gas Division Retirement 080.75367 37800 (4,954)
080 190 - Mid-Tex Gas Division Retirement 080.75368 37601 (1,652)
080 190 - Mid-Tex Gas Division Retirement 080.75368 37602 (14,323)
080 190 - Mid-Tex Gas Division Retirement 080.75368 38000 (4,535)
080 190 - Mid-Tex Gas Division Retirement 080.75379 37601 (1,470)
080 190 - Mid-Tex Gas Division Retirement 080.75379 37602 (1,342)
080 190 - Mid-Tex Gas Division Retirement 080.75379 38000 (7,963)
080 190 - Mid-Tex Gas Division Retirement 080.75380 37601 (8)
080 190 - Mid-Tex Gas Division Retirement 080.75380 37602 (1,255)
080 190 - Mid-Tex Gas Division Retirement 080.75381 37601 (51)
080 190 - Mid-Tex Gas Division Retirement 080.75381 37602 (1,194)
080 190 - Mid-Tex Gas Division Retirement 080.75381 37800 (15,356)
080 190 - Mid-Tex Gas Division Retirement 080.75383 37601 (19,098)
080 190 - Mid-Tex Gas Division Retirement 080.75383 37602 (23)
080 190 - Mid-Tex Gas Division Retirement 080.75383 37800 (12,071)
080 190 - Mid-Tex Gas Division Retirement 080.75384 37602 (629)
080 190 - Mid-Tex Gas Division Retirement 080.75392 37600 (94,426)
080 190 - Mid-Tex Gas Division Retirement 080.75398 37602 (30,770)
080 190 - Mid-Tex Gas Division Retirement 080.75398 38000 (12,965)
080 190 - Mid-Tex Gas Division Retirement 080.75399 37601 (5)
080 190 - Mid-Tex Gas Division Retirement 080.75399 37602 (6,373)
080 190 - Mid-Tex Gas Division Retirement 080.75399 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.75400 37601 (22,453)
080 190 - Mid-Tex Gas Division Retirement 080.75400 38000 (15,678)
080 190 - Mid-Tex Gas Division Retirement 080.75402 37601 (3,156)
080 190 - Mid-Tex Gas Division Retirement 080.75402 38000 (15,513)
080 190 - Mid-Tex Gas Division Retirement 080.75404 37601 (2,702)
080 190 - Mid-Tex Gas Division Retirement 080.75404 37602 (186)
080 190 - Mid-Tex Gas Division Retirement 080.75404 38000 (11,245)
080 190 - Mid-Tex Gas Division Retirement 080.75408 37601 (774)
080 190 - Mid-Tex Gas Division Retirement 080.75408 37602 (5,619)
080 190 - Mid-Tex Gas Division Retirement 080.75408 38000 (855)
080 190 - Mid-Tex Gas Division Retirement 080.75409 37601 (2,686)
080 190 - Mid-Tex Gas Division Retirement 080.75409 37602 (1,447)
080 190 - Mid-Tex Gas Division Retirement 080.75409 38000 (15,735)
080 190 - Mid-Tex Gas Division Retirement 080.75411 37601 (53,736)
080 190 - Mid-Tex Gas Division Retirement 080.75411 37602 (3,704)
080 190 - Mid-Tex Gas Division Retirement 080.75411 38000 (4,993)
080 190 - Mid-Tex Gas Division Retirement 080.75413 37601 (2,140)
080 190 - Mid-Tex Gas Division Retirement 080.75413 37602 (2,975)
080 190 - Mid-Tex Gas Division Retirement 080.75413 38000 (19,131)
080 190 - Mid-Tex Gas Division Retirement 080.75421 37602 (5,920)
080 190 - Mid-Tex Gas Division Retirement 080.75440 37602 (389)
080 190 - Mid-Tex Gas Division Retirement 080.75447 37800 (2,138)
080 190 - Mid-Tex Gas Division Retirement 080.75454 37601 (1,494)
080 190 - Mid-Tex Gas Division Retirement 080.75459 37601 (3,904)
080 190 - Mid-Tex Gas Division Retirement 080.75459 37602 (2,284)
080 190 - Mid-Tex Gas Division Retirement 080.75459 38000 (5,237)
080 190 - Mid-Tex Gas Division Retirement 080.75461 38000 (2,152)
080 190 - Mid-Tex Gas Division Retirement 080.75464 37601 (14)
080 190 - Mid-Tex Gas Division Retirement 080.75464 37800 (81,305)
080 190 - Mid-Tex Gas Division Retirement 080.75465 37602 (10)
080 190 - Mid-Tex Gas Division Retirement 080.75465 37800 (38,128)
080 190 - Mid-Tex Gas Division Retirement 080.75466 37601 (24)
080 190 - Mid-Tex Gas Division Retirement 080.75466 37602 (180)
080 190 - Mid-Tex Gas Division Retirement 080.75466 37800 (22,320)
080 190 - Mid-Tex Gas Division Retirement 080.75473 37602 (5,628)
080 190 - Mid-Tex Gas Division Retirement 080.75473 38000 (422)
080 190 - Mid-Tex Gas Division Retirement 080.75485 37601 (55)
080 190 - Mid-Tex Gas Division Retirement 080.75485 37602 (99)
080 190 - Mid-Tex Gas Division Retirement 080.75485 37800 (703)
080 190 - Mid-Tex Gas Division Retirement 080.75486 37601 (2,024)
080 190 - Mid-Tex Gas Division Retirement 080.75486 38000 (59)
080 190 - Mid-Tex Gas Division Retirement 080.75488 37601 (1,332)
080 190 - Mid-Tex Gas Division Retirement 080.75488 38000 (1,412)
080 190 - Mid-Tex Gas Division Retirement 080.75489 37601 (23)
080 190 - Mid-Tex Gas Division Retirement 080.75489 37602 (531)
080 190 - Mid-Tex Gas Division Retirement 080.75489 37800 (1,308)
080 190 - Mid-Tex Gas Division Retirement 080.75489 38000 (515)
080 190 - Mid-Tex Gas Division Retirement 080.75490 37601 (1,635)
080 190 - Mid-Tex Gas Division Retirement 080.75490 37602 (1,308)
080 190 - Mid-Tex Gas Division Retirement 080.75490 38000 (868)
080 190 - Mid-Tex Gas Division Retirement 080.75493 37601 (13)
080 190 - Mid-Tex Gas Division Retirement 080.75493 37602 (731)
080 190 - Mid-Tex Gas Division Retirement 080.75493 37800 (40,092)
080 190 - Mid-Tex Gas Division Retirement 080.75507 37601 (5,941)
080 190 - Mid-Tex Gas Division Retirement 080.75507 37602 (1,272)
080 190 - Mid-Tex Gas Division Retirement 080.75507 38000 (4,962)
080 190 - Mid-Tex Gas Division Retirement 080.75520 37600 (1,288)
080 190 - Mid-Tex Gas Division Retirement 080.75520 37601 (2,479)
080 190 - Mid-Tex Gas Division Retirement 080.75520 37602 (1,580)
080 190 - Mid-Tex Gas Division Retirement 080.75520 37800 (8,855)
080 190 - Mid-Tex Gas Division Retirement 080.75541 37601 (2,428)
080 190 - Mid-Tex Gas Division Retirement 080.75541 38000 (1,100)
080 190 - Mid-Tex Gas Division Retirement 080.75547 37601 (3,991)
080 190 - Mid-Tex Gas Division Retirement 080.75547 37602 (293)
080 190 - Mid-Tex Gas Division Retirement 080.75547 38000 (508)
080 190 - Mid-Tex Gas Division Retirement 080.75556 37601 (346)
080 190 - Mid-Tex Gas Division Retirement 080.75556 37602 (9)
080 190 - Mid-Tex Gas Division Retirement 080.75556 37800 (87,751)
080 190 - Mid-Tex Gas Division Retirement 080.75558 37601 (193)
080 190 - Mid-Tex Gas Division Retirement 080.75558 37800 (122,865)
080 190 - Mid-Tex Gas Division Retirement 080.75560 37601 (14,848)
080 190 - Mid-Tex Gas Division Retirement 080.75560 38000 (24,834)
080 190 - Mid-Tex Gas Division Retirement 080.75561 37601 (548)
080 190 - Mid-Tex Gas Division Retirement 080.75562 37601 (308)
080 190 - Mid-Tex Gas Division Retirement 080.75562 37602 (1,536)
080 190 - Mid-Tex Gas Division Retirement 080.75562 37800 (49,982)
080 190 - Mid-Tex Gas Division Retirement 080.75563 37601 (287)
080 190 - Mid-Tex Gas Division Retirement 080.75563 37602 (1,540)
080 190 - Mid-Tex Gas Division Retirement 080.75563 37800 (69,070)
080 190 - Mid-Tex Gas Division Retirement 080.75565 37601 (316)
MTX Retirements by FERC
Page 17 of 30
563
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.75565 37800 (38,966)
080 190 - Mid-Tex Gas Division Retirement 080.75567 38000 (32,501)
080 190 - Mid-Tex Gas Division Retirement 080.75571 37602 (4,742)
080 190 - Mid-Tex Gas Division Retirement 080.75571 38000 (7)
080 190 - Mid-Tex Gas Division Retirement 080.75574 37601 (53,283)
080 190 - Mid-Tex Gas Division Retirement 080.75575 37601 (5,871)
080 190 - Mid-Tex Gas Division Retirement 080.75575 37602 (5,699)
080 190 - Mid-Tex Gas Division Retirement 080.75575 37800 (12,725)
080 190 - Mid-Tex Gas Division Retirement 080.75575 38000 (7,672)
080 190 - Mid-Tex Gas Division Retirement 080.75578 37601 (8,588)
080 190 - Mid-Tex Gas Division Retirement 080.75578 37602 (39)
080 190 - Mid-Tex Gas Division Retirement 080.75578 38000 (1,946)
080 190 - Mid-Tex Gas Division Retirement 080.75584 37601 (1,597)
080 190 - Mid-Tex Gas Division Retirement 080.75584 37602 (406)
080 190 - Mid-Tex Gas Division Retirement 080.75587 37602 (473)
080 190 - Mid-Tex Gas Division Retirement 080.75598 37601 (333)
080 190 - Mid-Tex Gas Division Retirement 080.75598 37602 (126,986)
080 190 - Mid-Tex Gas Division Retirement 080.75598 38000 (132,999)
080 190 - Mid-Tex Gas Division Retirement 080.75601 37800 (17,818)
080 190 - Mid-Tex Gas Division Retirement 080.75605 38000 (86,260)
080 190 - Mid-Tex Gas Division Retirement 080.75606 37601 (476)
080 190 - Mid-Tex Gas Division Retirement 080.75606 37602 (256)
080 190 - Mid-Tex Gas Division Retirement 080.75606 38000 (4,313)
080 190 - Mid-Tex Gas Division Retirement 080.75608 37601 (6,981)
080 190 - Mid-Tex Gas Division Retirement 080.75608 37602 (5,292)
080 190 - Mid-Tex Gas Division Retirement 080.75608 38000 (4,804)
080 190 - Mid-Tex Gas Division Retirement 080.75618 37601 (36,302)
080 190 - Mid-Tex Gas Division Retirement 080.75618 37602 (112)
080 190 - Mid-Tex Gas Division Retirement 080.75618 38000 (22,848)
080 190 - Mid-Tex Gas Division Retirement 080.75623 37601 (276)
080 190 - Mid-Tex Gas Division Retirement 080.75624 37601 (2,694)
080 190 - Mid-Tex Gas Division Retirement 080.75624 38000 (985)
080 190 - Mid-Tex Gas Division Retirement 080.75625 37601 (48,575)
080 190 - Mid-Tex Gas Division Retirement 080.75625 38000 (11,184)
080 190 - Mid-Tex Gas Division Retirement 080.75628 37601 (2,593)
080 190 - Mid-Tex Gas Division Retirement 080.75628 38000 (300)
080 190 - Mid-Tex Gas Division Retirement 080.75642 38000 (286)
080 190 - Mid-Tex Gas Division Retirement 080.75647 37601 (79,835)
080 190 - Mid-Tex Gas Division Retirement 080.75647 37602 (6,008)
080 190 - Mid-Tex Gas Division Retirement 080.75648 37601 (10,936)
080 190 - Mid-Tex Gas Division Retirement 080.75648 37602 (4,683)
080 190 - Mid-Tex Gas Division Retirement 080.75648 38000 (5,557)
080 190 - Mid-Tex Gas Division Retirement 080.75649 37601 (294)
080 190 - Mid-Tex Gas Division Retirement 080.75649 37602 (810)
080 190 - Mid-Tex Gas Division Retirement 080.75649 38000 (410)
080 190 - Mid-Tex Gas Division Retirement 080.75650 37601 (32,657)
080 190 - Mid-Tex Gas Division Retirement 080.75650 37602 (595)
080 190 - Mid-Tex Gas Division Retirement 080.75650 38000 (4,312)
080 190 - Mid-Tex Gas Division Retirement 080.75651 37601 (9,132)
080 190 - Mid-Tex Gas Division Retirement 080.75651 37602 (1,637)
080 190 - Mid-Tex Gas Division Retirement 080.75651 38000 (18,884)
080 190 - Mid-Tex Gas Division Retirement 080.75653 37601 (3,488)
080 190 - Mid-Tex Gas Division Retirement 080.75653 37602 (11,260)
080 190 - Mid-Tex Gas Division Retirement 080.75653 38000 (7,215)
080 190 - Mid-Tex Gas Division Retirement 080.75656 37601 (2,928)
080 190 - Mid-Tex Gas Division Retirement 080.75656 38000 (356)
080 190 - Mid-Tex Gas Division Retirement 080.75657 37601 (338)
080 190 - Mid-Tex Gas Division Retirement 080.75658 37601 (28,123)
080 190 - Mid-Tex Gas Division Retirement 080.75658 37602 (2,585)
080 190 - Mid-Tex Gas Division Retirement 080.75658 38000 (11,032)
080 190 - Mid-Tex Gas Division Retirement 080.75660 37602 (226)
080 190 - Mid-Tex Gas Division Retirement 080.75682 38000 (317)
080 190 - Mid-Tex Gas Division Retirement 080.75682 38500 (1,875)
080 190 - Mid-Tex Gas Division Retirement 080.75698 37601 (52,617)
080 190 - Mid-Tex Gas Division Retirement 080.75698 38000 (29)
080 190 - Mid-Tex Gas Division Retirement 080.75702 37602 (999)
080 190 - Mid-Tex Gas Division Retirement 080.75705 37601 (3,459)
080 190 - Mid-Tex Gas Division Retirement 080.75705 37602 (7,454)
080 190 - Mid-Tex Gas Division Retirement 080.75705 37800 (31,781)
080 190 - Mid-Tex Gas Division Retirement 080.75705 38000 (8,993)
080 190 - Mid-Tex Gas Division Retirement 080.75706 37601 (260)
080 190 - Mid-Tex Gas Division Retirement 080.75712 37601 (1,926)
080 190 - Mid-Tex Gas Division Retirement 080.75712 37602 (11,067)
080 190 - Mid-Tex Gas Division Retirement 080.75712 38000 (24,593)
080 190 - Mid-Tex Gas Division Retirement 080.75716 37601 (72)
080 190 - Mid-Tex Gas Division Retirement 080.75716 37602 (82)
080 190 - Mid-Tex Gas Division Retirement 080.75716 37800 (1,902)
080 190 - Mid-Tex Gas Division Retirement 080.75717 37601 (42)
080 190 - Mid-Tex Gas Division Retirement 080.75717 37602 (107)
080 190 - Mid-Tex Gas Division Retirement 080.75717 37800 (2,915)
080 190 - Mid-Tex Gas Division Retirement 080.75720 37602 (427)
080 190 - Mid-Tex Gas Division Retirement 080.75720 38000 (119)
080 190 - Mid-Tex Gas Division Retirement 080.75722 37601 (645)
080 190 - Mid-Tex Gas Division Retirement 080.75722 37602 (16)
080 190 - Mid-Tex Gas Division Retirement 080.75722 38000 (0)
080 190 - Mid-Tex Gas Division Retirement 080.75723 37601 (2,546)
080 190 - Mid-Tex Gas Division Retirement 080.75723 38000 (276)
080 190 - Mid-Tex Gas Division Retirement 080.75728 37601 (3,185)
080 190 - Mid-Tex Gas Division Retirement 080.75728 37602 (2,210)
080 190 - Mid-Tex Gas Division Retirement 080.75728 38000 (863)
080 190 - Mid-Tex Gas Division Retirement 080.75729 37601 (3,028)
080 190 - Mid-Tex Gas Division Retirement 080.75729 37602 (2,340)
080 190 - Mid-Tex Gas Division Retirement 080.75729 37800 (443)
080 190 - Mid-Tex Gas Division Retirement 080.75729 38000 (14,858)
080 190 - Mid-Tex Gas Division Retirement 080.75730 37601 (2,399)
080 190 - Mid-Tex Gas Division Retirement 080.75730 37602 (841)
080 190 - Mid-Tex Gas Division Retirement 080.75730 37800 (92,630)
080 190 - Mid-Tex Gas Division Retirement 080.75730 38000 (1,940)
080 190 - Mid-Tex Gas Division Retirement 080.75731 37601 (697)
080 190 - Mid-Tex Gas Division Retirement 080.75731 37602 (747)
080 190 - Mid-Tex Gas Division Retirement 080.75731 37800 (12,054)
080 190 - Mid-Tex Gas Division Retirement 080.75731 38000 (3,012)
080 190 - Mid-Tex Gas Division Retirement 080.75736 37601 (7,230)
080 190 - Mid-Tex Gas Division Retirement 080.75736 38000 (1,325)
080 190 - Mid-Tex Gas Division Retirement 080.75742 37601 (313)
080 190 - Mid-Tex Gas Division Retirement 080.75742 37602 (1,386)
080 190 - Mid-Tex Gas Division Retirement 080.75742 38000 (172)
MTX Retirements by FERC
Page 18 of 30
564
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.75750 37602 (270)
080 190 - Mid-Tex Gas Division Retirement 080.75750 37800 (5,303)
080 190 - Mid-Tex Gas Division Retirement 080.75752 37601 (6,881)
080 190 - Mid-Tex Gas Division Retirement 080.75752 38000 (922)
080 190 - Mid-Tex Gas Division Retirement 080.75753 37601 (5,117)
080 190 - Mid-Tex Gas Division Retirement 080.75753 37602 (658)
080 190 - Mid-Tex Gas Division Retirement 080.75753 38000 (5,436)
080 190 - Mid-Tex Gas Division Retirement 080.75754 37601 (1,452)
080 190 - Mid-Tex Gas Division Retirement 080.75754 37602 (2,774)
080 190 - Mid-Tex Gas Division Retirement 080.75754 38000 (9,684)
080 190 - Mid-Tex Gas Division Retirement 080.75758 37601 (1,542)
080 190 - Mid-Tex Gas Division Retirement 080.75758 37602 (22)
080 190 - Mid-Tex Gas Division Retirement 080.75758 38000 (6,309)
080 190 - Mid-Tex Gas Division Retirement 080.75769 37602 (3,316)
080 190 - Mid-Tex Gas Division Retirement 080.75769 38000 (794)
080 190 - Mid-Tex Gas Division Retirement 080.75770 37601 (953)
080 190 - Mid-Tex Gas Division Retirement 080.75770 37602 (370)
080 190 - Mid-Tex Gas Division Retirement 080.75770 38000 (3,382)
080 190 - Mid-Tex Gas Division Retirement 080.75777 37601 (1,587)
080 190 - Mid-Tex Gas Division Retirement 080.75777 38000 (3,998)
080 190 - Mid-Tex Gas Division Retirement 080.75780 37601 (5,075)
080 190 - Mid-Tex Gas Division Retirement 080.75780 37602 (209,175)
080 190 - Mid-Tex Gas Division Retirement 080.75780 37800 (11,398)
080 190 - Mid-Tex Gas Division Retirement 080.75780 38000 (16,073)
080 190 - Mid-Tex Gas Division Retirement 080.75782 37601 (256)
080 190 - Mid-Tex Gas Division Retirement 080.75782 37602 (324)
080 190 - Mid-Tex Gas Division Retirement 080.75782 38000 (6,751)
080 190 - Mid-Tex Gas Division Retirement 080.75784 37800 (677)
080 190 - Mid-Tex Gas Division Retirement 080.75786 37601 (10,757)
080 190 - Mid-Tex Gas Division Retirement 080.75786 37602 (9,651)
080 190 - Mid-Tex Gas Division Retirement 080.75786 38000 (434)
080 190 - Mid-Tex Gas Division Retirement 080.75788 37601 (528)
080 190 - Mid-Tex Gas Division Retirement 080.75788 37602 (1,218)
080 190 - Mid-Tex Gas Division Retirement 080.75788 38000 (4,108)
080 190 - Mid-Tex Gas Division Retirement 080.75795 37601 (438)
080 190 - Mid-Tex Gas Division Retirement 080.75797 37602 (9,477)
080 190 - Mid-Tex Gas Division Retirement 080.75799 37601 (1,873)
080 190 - Mid-Tex Gas Division Retirement 080.75799 37602 (1,291)
080 190 - Mid-Tex Gas Division Retirement 080.75799 38000 (558)
080 190 - Mid-Tex Gas Division Retirement 080.75806 37602 (50,245)
080 190 - Mid-Tex Gas Division Retirement 080.75806 38000 (68,618)
080 190 - Mid-Tex Gas Division Retirement 080.75807 37601 (1,442)
080 190 - Mid-Tex Gas Division Retirement 080.75807 37602 (67)
080 190 - Mid-Tex Gas Division Retirement 080.75807 38000 (12,614)
080 190 - Mid-Tex Gas Division Retirement 080.75808 37602 (387)
080 190 - Mid-Tex Gas Division Retirement 080.75815 37602 (583)
080 190 - Mid-Tex Gas Division Retirement 080.75818 37602 (7,017)
080 190 - Mid-Tex Gas Division Retirement 080.75821 37601 (1,652)
080 190 - Mid-Tex Gas Division Retirement 080.75821 38000 (128)
080 190 - Mid-Tex Gas Division Retirement 080.75825 37601 (85)
080 190 - Mid-Tex Gas Division Retirement 080.75825 37800 (11,615)
080 190 - Mid-Tex Gas Division Retirement 080.75825 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.75827 37602 (14)
080 190 - Mid-Tex Gas Division Retirement 080.75827 37800 (204)
080 190 - Mid-Tex Gas Division Retirement 080.75828 37601 (1,737)
080 190 - Mid-Tex Gas Division Retirement 080.75828 37800 (18,367)
080 190 - Mid-Tex Gas Division Retirement 080.75828 38000 (538)
080 190 - Mid-Tex Gas Division Retirement 080.75830 37601 (211)
080 190 - Mid-Tex Gas Division Retirement 080.75830 37800 (818)
080 190 - Mid-Tex Gas Division Retirement 080.75830 38000 (153)
080 190 - Mid-Tex Gas Division Retirement 080.75845 37601 (25)
080 190 - Mid-Tex Gas Division Retirement 080.75845 37602 (58,358)
080 190 - Mid-Tex Gas Division Retirement 080.75845 37800 (510)
080 190 - Mid-Tex Gas Division Retirement 080.75847 37602 (257)
080 190 - Mid-Tex Gas Division Retirement 080.75854 37601 (9,452)
080 190 - Mid-Tex Gas Division Retirement 080.75858 37601 (11,194)
080 190 - Mid-Tex Gas Division Retirement 080.75858 37602 (87)
080 190 - Mid-Tex Gas Division Retirement 080.75860 37601 (573)
080 190 - Mid-Tex Gas Division Retirement 080.75860 37602 (35,992)
080 190 - Mid-Tex Gas Division Retirement 080.75860 38000 (725)
080 190 - Mid-Tex Gas Division Retirement 080.75863 37601 (14,914)
080 190 - Mid-Tex Gas Division Retirement 080.75863 37602 (470)
080 190 - Mid-Tex Gas Division Retirement 080.75863 38000 (33,365)
080 190 - Mid-Tex Gas Division Retirement 080.75867 37601 (125)
080 190 - Mid-Tex Gas Division Retirement 080.75867 37602 (460)
080 190 - Mid-Tex Gas Division Retirement 080.75870 37601 (313)
080 190 - Mid-Tex Gas Division Retirement 080.75870 38000 (363)
080 190 - Mid-Tex Gas Division Retirement 080.75883 37601 (306)
080 190 - Mid-Tex Gas Division Retirement 080.75883 37800 (174)
080 190 - Mid-Tex Gas Division Retirement 080.75894 37602 (1,197)
080 190 - Mid-Tex Gas Division Retirement 080.75907 37601 (546)
080 190 - Mid-Tex Gas Division Retirement 080.75907 37602 (514)
080 190 - Mid-Tex Gas Division Retirement 080.75908 37602 (2)
080 190 - Mid-Tex Gas Division Retirement 080.75911 37602 (2,523)
080 190 - Mid-Tex Gas Division Retirement 080.75919 37601 (98,315)
080 190 - Mid-Tex Gas Division Retirement 080.75919 37602 (5,532)
080 190 - Mid-Tex Gas Division Retirement 080.75919 38000 (10,886)
080 190 - Mid-Tex Gas Division Retirement 080.75921 37602 (89)
080 190 - Mid-Tex Gas Division Retirement 080.75921 38000 (701)
080 190 - Mid-Tex Gas Division Retirement 080.75922 37601 (1,098)
080 190 - Mid-Tex Gas Division Retirement 080.75924 37601 (347)
080 190 - Mid-Tex Gas Division Retirement 080.75924 37602 (8)
080 190 - Mid-Tex Gas Division Retirement 080.75924 37800 (2,128)
080 190 - Mid-Tex Gas Division Retirement 080.75924 38000 (1,389)
080 190 - Mid-Tex Gas Division Retirement 080.75925 37601 (413)
080 190 - Mid-Tex Gas Division Retirement 080.75925 37602 (30)
080 190 - Mid-Tex Gas Division Retirement 080.75925 37800 (10,406)
080 190 - Mid-Tex Gas Division Retirement 080.75925 38000 (220)
080 190 - Mid-Tex Gas Division Retirement 080.75954 37602 (558)
080 190 - Mid-Tex Gas Division Retirement 080.75966 37601 (19,027)
080 190 - Mid-Tex Gas Division Retirement 080.75966 37602 (1,101)
080 190 - Mid-Tex Gas Division Retirement 080.75966 38000 (16,789)
080 190 - Mid-Tex Gas Division Retirement 080.75967 37602 (8,167)
080 190 - Mid-Tex Gas Division Retirement 080.75967 38000 (65,761)
080 190 - Mid-Tex Gas Division Retirement 080.75968 37602 (107,607)
080 190 - Mid-Tex Gas Division Retirement 080.75968 38000 (6,439)
080 190 - Mid-Tex Gas Division Retirement 080.75975 37601 (1,184)
MTX Retirements by FERC
Page 19 of 30
565
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.75975 37602 (1,834)
080 190 - Mid-Tex Gas Division Retirement 080.75975 37800 (181)
080 190 - Mid-Tex Gas Division Retirement 080.75975 38000 (843)
080 190 - Mid-Tex Gas Division Retirement 080.75976 37601 (229)
080 190 - Mid-Tex Gas Division Retirement 080.75976 37602 (19,225)
080 190 - Mid-Tex Gas Division Retirement 080.75976 38000 (280)
080 190 - Mid-Tex Gas Division Retirement 080.75987 38000 (31)
080 190 - Mid-Tex Gas Division Retirement 080.75994 37601 (1,457)
080 190 - Mid-Tex Gas Division Retirement 080.75994 37602 (157)
080 190 - Mid-Tex Gas Division Retirement 080.75994 37800 (59,331)
080 190 - Mid-Tex Gas Division Retirement 080.75994 38000 (2,597)
080 190 - Mid-Tex Gas Division Retirement 080.76004 37601 (46)
080 190 - Mid-Tex Gas Division Retirement 080.76004 37602 (491)
080 190 - Mid-Tex Gas Division Retirement 080.76012 37601 (4,126)
080 190 - Mid-Tex Gas Division Retirement 080.76012 37602 (404)
080 190 - Mid-Tex Gas Division Retirement 080.76012 38000 (10,679)
080 190 - Mid-Tex Gas Division Retirement 080.76018 37602 (7,479)
080 190 - Mid-Tex Gas Division Retirement 080.76024 37601 (9)
080 190 - Mid-Tex Gas Division Retirement 080.76024 37602 (1,052)
080 190 - Mid-Tex Gas Division Retirement 080.76024 37800 (44,788)
080 190 - Mid-Tex Gas Division Retirement 080.76025 37601 (19)
080 190 - Mid-Tex Gas Division Retirement 080.76025 37602 (74)
080 190 - Mid-Tex Gas Division Retirement 080.76025 37800 (36,667)
080 190 - Mid-Tex Gas Division Retirement 080.76026 37601 (517)
080 190 - Mid-Tex Gas Division Retirement 080.76026 37602 (655)
080 190 - Mid-Tex Gas Division Retirement 080.76026 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.76027 37601 (1,610)
080 190 - Mid-Tex Gas Division Retirement 080.76027 38000 (109)
080 190 - Mid-Tex Gas Division Retirement 080.76033 37601 (1,971)
080 190 - Mid-Tex Gas Division Retirement 080.76039 37601 (10,619)
080 190 - Mid-Tex Gas Division Retirement 080.76039 37602 (60)
080 190 - Mid-Tex Gas Division Retirement 080.76039 38000 (26,314)
080 190 - Mid-Tex Gas Division Retirement 080.76047 37601 (382)
080 190 - Mid-Tex Gas Division Retirement 080.76047 37602 (101)
080 190 - Mid-Tex Gas Division Retirement 080.76052 37601 (485)
080 190 - Mid-Tex Gas Division Retirement 080.76052 37602 (192)
080 190 - Mid-Tex Gas Division Retirement 080.76055 37601 (75)
080 190 - Mid-Tex Gas Division Retirement 080.76055 37602 (16)
080 190 - Mid-Tex Gas Division Retirement 080.76085 37601 (2,810)
080 190 - Mid-Tex Gas Division Retirement 080.76085 38000 (9,270)
080 190 - Mid-Tex Gas Division Retirement 080.76087 37601 (88)
080 190 - Mid-Tex Gas Division Retirement 080.76087 37800 (13,081)
080 190 - Mid-Tex Gas Division Retirement 080.76087 38000 (557)
080 190 - Mid-Tex Gas Division Retirement 080.76088 37601 (2,842)
080 190 - Mid-Tex Gas Division Retirement 080.76088 37602 (437)
080 190 - Mid-Tex Gas Division Retirement 080.76088 37800 (37,720)
080 190 - Mid-Tex Gas Division Retirement 080.76089 37601 (294)
080 190 - Mid-Tex Gas Division Retirement 080.76089 37602 (818)
080 190 - Mid-Tex Gas Division Retirement 080.76089 37800 (23,763)
080 190 - Mid-Tex Gas Division Retirement 080.76089 38000 (102)
080 190 - Mid-Tex Gas Division Retirement 080.76093 37601 (12,612)
080 190 - Mid-Tex Gas Division Retirement 080.76093 38000 (22,968)
080 190 - Mid-Tex Gas Division Retirement 080.76098 37601 (79,894)
080 190 - Mid-Tex Gas Division Retirement 080.76098 38000 (12,487)
080 190 - Mid-Tex Gas Division Retirement 080.76101 37601 (4)
080 190 - Mid-Tex Gas Division Retirement 080.76101 37602 (533)
080 190 - Mid-Tex Gas Division Retirement 080.76101 37800 (34,871)
080 190 - Mid-Tex Gas Division Retirement 080.76107 37601 (30,125)
080 190 - Mid-Tex Gas Division Retirement 080.76107 37602 (9,711)
080 190 - Mid-Tex Gas Division Retirement 080.76107 37800 (8,993)
080 190 - Mid-Tex Gas Division Retirement 080.76110 37601 (20,406)
080 190 - Mid-Tex Gas Division Retirement 080.76111 37601 (767)
080 190 - Mid-Tex Gas Division Retirement 080.76111 37602 (1,248)
080 190 - Mid-Tex Gas Division Retirement 080.76111 38000 (14,396)
080 190 - Mid-Tex Gas Division Retirement 080.76120 37601 (28)
080 190 - Mid-Tex Gas Division Retirement 080.76120 37602 (32)
080 190 - Mid-Tex Gas Division Retirement 080.76120 37800 (232,464)
080 190 - Mid-Tex Gas Division Retirement 080.76121 37601 (289)
080 190 - Mid-Tex Gas Division Retirement 080.76121 38000 (6,388)
080 190 - Mid-Tex Gas Division Retirement 080.76122 37601 (956)
080 190 - Mid-Tex Gas Division Retirement 080.76122 37602 (343)
080 190 - Mid-Tex Gas Division Retirement 080.76122 38000 (1,798)
080 190 - Mid-Tex Gas Division Retirement 080.76127 37601 (2,058)
080 190 - Mid-Tex Gas Division Retirement 080.76127 37602 (19,256)
080 190 - Mid-Tex Gas Division Retirement 080.76138 37601 (28)
080 190 - Mid-Tex Gas Division Retirement 080.76138 37602 (22)
080 190 - Mid-Tex Gas Division Retirement 080.76138 37800 (444)
080 190 - Mid-Tex Gas Division Retirement 080.76140 37601 (109)
080 190 - Mid-Tex Gas Division Retirement 080.76140 37800 (34,538)
080 190 - Mid-Tex Gas Division Retirement 080.76141 37601 (1,650)
080 190 - Mid-Tex Gas Division Retirement 080.76141 37602 (62)
080 190 - Mid-Tex Gas Division Retirement 080.76141 38000 (1,258)
080 190 - Mid-Tex Gas Division Retirement 080.76143 37601 (19,504)
080 190 - Mid-Tex Gas Division Retirement 080.76143 38000 (5,342)
080 190 - Mid-Tex Gas Division Retirement 080.76145 37601 (14,332)
080 190 - Mid-Tex Gas Division Retirement 080.76149 37601 (14,009)
080 190 - Mid-Tex Gas Division Retirement 080.76149 37602 (2,764)
080 190 - Mid-Tex Gas Division Retirement 080.76149 38000 (31,321)
080 190 - Mid-Tex Gas Division Retirement 080.76150 37601 (1,086)
080 190 - Mid-Tex Gas Division Retirement 080.76150 37602 (44,714)
080 190 - Mid-Tex Gas Division Retirement 080.76150 38000 (2,148)
080 190 - Mid-Tex Gas Division Retirement 080.76151 37601 (519)
080 190 - Mid-Tex Gas Division Retirement 080.76151 37602 (8,907)
080 190 - Mid-Tex Gas Division Retirement 080.76151 38000 (4,655)
080 190 - Mid-Tex Gas Division Retirement 080.76155 37601 (460)
080 190 - Mid-Tex Gas Division Retirement 080.76160 37800 (9,247)
080 190 - Mid-Tex Gas Division Retirement 080.76161 37602 (24,730)
080 190 - Mid-Tex Gas Division Retirement 080.76161 38000 (1,731)
080 190 - Mid-Tex Gas Division Retirement 080.76166 37601 (333)
080 190 - Mid-Tex Gas Division Retirement 080.76166 38000 (17,848)
080 190 - Mid-Tex Gas Division Retirement 080.76182 37602 (176)
080 190 - Mid-Tex Gas Division Retirement 080.76182 38000 (477)
080 190 - Mid-Tex Gas Division Retirement 080.76189 37602 (152)
080 190 - Mid-Tex Gas Division Retirement 080.76192 37601 (672)
080 190 - Mid-Tex Gas Division Retirement 080.76192 37800 (2,704)
080 190 - Mid-Tex Gas Division Retirement 080.76192 38000 (1,195)
080 190 - Mid-Tex Gas Division Retirement 080.76198 37601 (1,671)
MTX Retirements by FERC
Page 20 of 30
566
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.76198 37602 (2,335)
080 190 - Mid-Tex Gas Division Retirement 080.76198 38000 (17,206)
080 190 - Mid-Tex Gas Division Retirement 080.76199 37601 (1,290)
080 190 - Mid-Tex Gas Division Retirement 080.76199 37602 (1,896)
080 190 - Mid-Tex Gas Division Retirement 080.76199 38000 (17,929)
080 190 - Mid-Tex Gas Division Retirement 080.76200 37601 (3,853)
080 190 - Mid-Tex Gas Division Retirement 080.76200 37602 (568)
080 190 - Mid-Tex Gas Division Retirement 080.76200 38000 (17,500)
080 190 - Mid-Tex Gas Division Retirement 080.76201 37601 (4,195)
080 190 - Mid-Tex Gas Division Retirement 080.76201 37602 (1,388)
080 190 - Mid-Tex Gas Division Retirement 080.76201 38000 (14,787)
080 190 - Mid-Tex Gas Division Retirement 080.76202 37601 (2,706)
080 190 - Mid-Tex Gas Division Retirement 080.76202 37602 (1,159)
080 190 - Mid-Tex Gas Division Retirement 080.76202 38000 (23,939)
080 190 - Mid-Tex Gas Division Retirement 080.76205 37601 (1,237)
080 190 - Mid-Tex Gas Division Retirement 080.76205 37602 (413)
080 190 - Mid-Tex Gas Division Retirement 080.76205 38000 (15,546)
080 190 - Mid-Tex Gas Division Retirement 080.76217 37601 (3,362)
080 190 - Mid-Tex Gas Division Retirement 080.76217 37602 (3,627)
080 190 - Mid-Tex Gas Division Retirement 080.76217 38000 (995)
080 190 - Mid-Tex Gas Division Retirement 080.76225 37601 (243)
080 190 - Mid-Tex Gas Division Retirement 080.76225 37602 (779)
080 190 - Mid-Tex Gas Division Retirement 080.76248 37800 (687)
080 190 - Mid-Tex Gas Division Retirement 080.76250 37601 (11,568)
080 190 - Mid-Tex Gas Division Retirement 080.76250 37602 (43)
080 190 - Mid-Tex Gas Division Retirement 080.76250 38000 (23,720)
080 190 - Mid-Tex Gas Division Retirement 080.76256 37601 (36,973)
080 190 - Mid-Tex Gas Division Retirement 080.76256 37602 (19)
080 190 - Mid-Tex Gas Division Retirement 080.76256 38000 (5,353)
080 190 - Mid-Tex Gas Division Retirement 080.76259 37601 (5,506)
080 190 - Mid-Tex Gas Division Retirement 080.76259 38000 (3,652)
080 190 - Mid-Tex Gas Division Retirement 080.76260 37601 (2,934)
080 190 - Mid-Tex Gas Division Retirement 080.76260 37602 (2,225)
080 190 - Mid-Tex Gas Division Retirement 080.76260 38000 (5,230)
080 190 - Mid-Tex Gas Division Retirement 080.76262 37601 (1,025)
080 190 - Mid-Tex Gas Division Retirement 080.76262 38000 (9,772)
080 190 - Mid-Tex Gas Division Retirement 080.76263 37601 (2,228)
080 190 - Mid-Tex Gas Division Retirement 080.76263 37602 (1,529)
080 190 - Mid-Tex Gas Division Retirement 080.76263 38000 (11,950)
080 190 - Mid-Tex Gas Division Retirement 080.76264 37601 (5,190)
080 190 - Mid-Tex Gas Division Retirement 080.76264 38000 (10,829)
080 190 - Mid-Tex Gas Division Retirement 080.76265 37601 (2,706)
080 190 - Mid-Tex Gas Division Retirement 080.76265 37602 (3,015)
080 190 - Mid-Tex Gas Division Retirement 080.76265 38000 (9,907)
080 190 - Mid-Tex Gas Division Retirement 080.76266 37601 (6,771)
080 190 - Mid-Tex Gas Division Retirement 080.76266 38000 (4,306)
080 190 - Mid-Tex Gas Division Retirement 080.76267 37601 (1,986)
080 190 - Mid-Tex Gas Division Retirement 080.76267 37602 (528)
080 190 - Mid-Tex Gas Division Retirement 080.76267 38000 (4,207)
080 190 - Mid-Tex Gas Division Retirement 080.76268 37602 (1,540)
080 190 - Mid-Tex Gas Division Retirement 080.76268 38000 (11,906)
080 190 - Mid-Tex Gas Division Retirement 080.76269 37602 (5,855)
080 190 - Mid-Tex Gas Division Retirement 080.76269 38000 (5,208)
080 190 - Mid-Tex Gas Division Retirement 080.76270 37601 (3,805)
080 190 - Mid-Tex Gas Division Retirement 080.76270 37602 (191)
080 190 - Mid-Tex Gas Division Retirement 080.76270 38000 (12,284)
080 190 - Mid-Tex Gas Division Retirement 080.76293 37601 (8,500)
080 190 - Mid-Tex Gas Division Retirement 080.76315 37601 (10,241)
080 190 - Mid-Tex Gas Division Retirement 080.76315 37602 (23)
080 190 - Mid-Tex Gas Division Retirement 080.76315 38000 (5,102)
080 190 - Mid-Tex Gas Division Retirement 080.76330 37602 (22,441)
080 190 - Mid-Tex Gas Division Retirement 080.76330 38000 (649)
080 190 - Mid-Tex Gas Division Retirement 080.76332 37602 (3,857)
080 190 - Mid-Tex Gas Division Retirement 080.76332 38000 (5,135)
080 190 - Mid-Tex Gas Division Retirement 080.76335 37602 (11,068)
080 190 - Mid-Tex Gas Division Retirement 080.76335 38000 (8,917)
080 190 - Mid-Tex Gas Division Retirement 080.76338 37601 (2,798)
080 190 - Mid-Tex Gas Division Retirement 080.76338 38000 (11,295)
080 190 - Mid-Tex Gas Division Retirement 080.76339 37601 (1,269)
080 190 - Mid-Tex Gas Division Retirement 080.76339 38000 (3,871)
080 190 - Mid-Tex Gas Division Retirement 080.76343 37602 (2,249)
080 190 - Mid-Tex Gas Division Retirement 080.76343 38000 (7,102)
080 190 - Mid-Tex Gas Division Retirement 080.76346 37602 (2,474)
080 190 - Mid-Tex Gas Division Retirement 080.76346 38000 (2,496)
080 190 - Mid-Tex Gas Division Retirement 080.76347 37602 (2,270)
080 190 - Mid-Tex Gas Division Retirement 080.76347 38000 (3,588)
080 190 - Mid-Tex Gas Division Retirement 080.76349 37602 (2,693)
080 190 - Mid-Tex Gas Division Retirement 080.76349 38000 (2,060)
080 190 - Mid-Tex Gas Division Retirement 080.76350 37602 (3,745)
080 190 - Mid-Tex Gas Division Retirement 080.76350 38000 (7,312)
080 190 - Mid-Tex Gas Division Retirement 080.76354 37601 (2,606)
080 190 - Mid-Tex Gas Division Retirement 080.76354 37602 (8,164)
080 190 - Mid-Tex Gas Division Retirement 080.76354 38000 (4,963)
080 190 - Mid-Tex Gas Division Retirement 080.76356 37601 (1,259)
080 190 - Mid-Tex Gas Division Retirement 080.76356 37602 (1,224)
080 190 - Mid-Tex Gas Division Retirement 080.76364 37602 (261)
080 190 - Mid-Tex Gas Division Retirement 080.76370 37601 (67)
080 190 - Mid-Tex Gas Division Retirement 080.76375 37601 (48)
080 190 - Mid-Tex Gas Division Retirement 080.76375 37602 (30)
080 190 - Mid-Tex Gas Division Retirement 080.76375 37800 (109,639)
080 190 - Mid-Tex Gas Division Retirement 080.76376 38000 (64,986)
080 190 - Mid-Tex Gas Division Retirement 080.76378 37601 (274)
080 190 - Mid-Tex Gas Division Retirement 080.76378 37602 (645)
080 190 - Mid-Tex Gas Division Retirement 080.76378 38000 (1,433)
080 190 - Mid-Tex Gas Division Retirement 080.76379 37601 (6,998)
080 190 - Mid-Tex Gas Division Retirement 080.76379 38000 (6,255)
080 190 - Mid-Tex Gas Division Retirement 080.76382 37601 (1,319)
080 190 - Mid-Tex Gas Division Retirement 080.76382 37602 (2,106)
080 190 - Mid-Tex Gas Division Retirement 080.76390 37601 (25,673)
080 190 - Mid-Tex Gas Division Retirement 080.76390 37602 (810)
080 190 - Mid-Tex Gas Division Retirement 080.76390 38000 (24,730)
080 190 - Mid-Tex Gas Division Retirement 080.76402 37601 (3,774)
080 190 - Mid-Tex Gas Division Retirement 080.76402 38000 (980)
080 190 - Mid-Tex Gas Division Retirement 080.76404 37601 (37)
080 190 - Mid-Tex Gas Division Retirement 080.76405 37602 (63)
080 190 - Mid-Tex Gas Division Retirement 080.76419 37601 (779)
080 190 - Mid-Tex Gas Division Retirement 080.76419 38000 (19,038)
MTX Retirements by FERC
Page 21 of 30
567
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.76420 37601 (4,489)
080 190 - Mid-Tex Gas Division Retirement 080.76420 38000 (6,404)
080 190 - Mid-Tex Gas Division Retirement 080.76421 37601 (799)
080 190 - Mid-Tex Gas Division Retirement 080.76421 38000 (13,454)
080 190 - Mid-Tex Gas Division Retirement 080.76422 37601 (1,821)
080 190 - Mid-Tex Gas Division Retirement 080.76422 37602 (24)
080 190 - Mid-Tex Gas Division Retirement 080.76422 38000 (2,909)
080 190 - Mid-Tex Gas Division Retirement 080.76425 37601 (136,700)
080 190 - Mid-Tex Gas Division Retirement 080.76425 37602 (81)
080 190 - Mid-Tex Gas Division Retirement 080.76425 38000 (5,035)
080 190 - Mid-Tex Gas Division Retirement 080.76426 37601 (1,620)
080 190 - Mid-Tex Gas Division Retirement 080.76426 38000 (6,603)
080 190 - Mid-Tex Gas Division Retirement 080.76428 37601 (426)
080 190 - Mid-Tex Gas Division Retirement 080.76428 38000 (3,125)
080 190 - Mid-Tex Gas Division Retirement 080.76429 37601 (1,063)
080 190 - Mid-Tex Gas Division Retirement 080.76429 38000 (2,837)
080 190 - Mid-Tex Gas Division Retirement 080.76431 37601 (2,788)
080 190 - Mid-Tex Gas Division Retirement 080.76431 37602 (5,059)
080 190 - Mid-Tex Gas Division Retirement 080.76431 38000 (8,846)
080 190 - Mid-Tex Gas Division Retirement 080.76434 37601 (22)
080 190 - Mid-Tex Gas Division Retirement 080.76434 37602 (18)
080 190 - Mid-Tex Gas Division Retirement 080.76434 37800 (30,804)
080 190 - Mid-Tex Gas Division Retirement 080.76440 37601 (351)
080 190 - Mid-Tex Gas Division Retirement 080.76440 37800 (83,600)
080 190 - Mid-Tex Gas Division Retirement 080.76451 37601 (7,985)
080 190 - Mid-Tex Gas Division Retirement 080.76451 37602 (50)
080 190 - Mid-Tex Gas Division Retirement 080.76451 38000 (8,433)
080 190 - Mid-Tex Gas Division Retirement 080.76458 37601 (46,122)
080 190 - Mid-Tex Gas Division Retirement 080.76461 37601 (3,816)
080 190 - Mid-Tex Gas Division Retirement 080.76461 37602 (1,222)
080 190 - Mid-Tex Gas Division Retirement 080.76461 38000 (1,838)
080 190 - Mid-Tex Gas Division Retirement 080.76468 37602 (5,150)
080 190 - Mid-Tex Gas Division Retirement 080.76468 38000 (187)
080 190 - Mid-Tex Gas Division Retirement 080.76473 37601 (7,878)
080 190 - Mid-Tex Gas Division Retirement 080.76473 37602 (1,118)
080 190 - Mid-Tex Gas Division Retirement 080.76473 37800 (2,558)
080 190 - Mid-Tex Gas Division Retirement 080.76478 37602 (1,255)
080 190 - Mid-Tex Gas Division Retirement 080.76481 37601 (105)
080 190 - Mid-Tex Gas Division Retirement 080.76481 38000 (509)
080 190 - Mid-Tex Gas Division Retirement 080.76483 37601 (813)
080 190 - Mid-Tex Gas Division Retirement 080.76483 38000 (20)
080 190 - Mid-Tex Gas Division Retirement 080.76490 37601 (538)
080 190 - Mid-Tex Gas Division Retirement 080.76491 37600 (35,202)
080 190 - Mid-Tex Gas Division Retirement 080.76496 37601 (604)
080 190 - Mid-Tex Gas Division Retirement 080.76496 38000 (1,345)
080 190 - Mid-Tex Gas Division Retirement 080.76504 37602 (13,225)
080 190 - Mid-Tex Gas Division Retirement 080.76504 38000 (303)
080 190 - Mid-Tex Gas Division Retirement 080.76508 37601 (8,125)
080 190 - Mid-Tex Gas Division Retirement 080.76508 37602 (1,987)
080 190 - Mid-Tex Gas Division Retirement 080.76508 38000 (29)
080 190 - Mid-Tex Gas Division Retirement 080.76509 37601 (1,243)
080 190 - Mid-Tex Gas Division Retirement 080.76509 38000 (4,900)
080 190 - Mid-Tex Gas Division Retirement 080.76510 37601 (8,279)
080 190 - Mid-Tex Gas Division Retirement 080.76510 37602 (5,545)
080 190 - Mid-Tex Gas Division Retirement 080.76510 38000 (4,004)
080 190 - Mid-Tex Gas Division Retirement 080.76511 37602 (43,028)
080 190 - Mid-Tex Gas Division Retirement 080.76513 37601 (4,376)
080 190 - Mid-Tex Gas Division Retirement 080.76513 37602 (1,211)
080 190 - Mid-Tex Gas Division Retirement 080.76513 38000 (2,706)
080 190 - Mid-Tex Gas Division Retirement 080.76514 37601 (8,661)
080 190 - Mid-Tex Gas Division Retirement 080.76514 37602 (8)
080 190 - Mid-Tex Gas Division Retirement 080.76515 37601 (1,980)
080 190 - Mid-Tex Gas Division Retirement 080.76515 37602 (9,610)
080 190 - Mid-Tex Gas Division Retirement 080.76515 38000 (1,168)
080 190 - Mid-Tex Gas Division Retirement 080.76516 37601 (1,382)
080 190 - Mid-Tex Gas Division Retirement 080.76516 38000 (4,318)
080 190 - Mid-Tex Gas Division Retirement 080.76521 37602 (3,163)
080 190 - Mid-Tex Gas Division Retirement 080.76522 37601 (1,192)
080 190 - Mid-Tex Gas Division Retirement 080.76522 37602 (806)
080 190 - Mid-Tex Gas Division Retirement 080.76522 38000 (3,661)
080 190 - Mid-Tex Gas Division Retirement 080.76523 37601 (58,419)
080 190 - Mid-Tex Gas Division Retirement 080.76535 37601 (401)
080 190 - Mid-Tex Gas Division Retirement 080.76535 37602 (40)
080 190 - Mid-Tex Gas Division Retirement 080.76538 37601 (1,597)
080 190 - Mid-Tex Gas Division Retirement 080.76538 37602 (2,960)
080 190 - Mid-Tex Gas Division Retirement 080.76556 37601 (1,479)
080 190 - Mid-Tex Gas Division Retirement 080.76556 37602 (2,091)
080 190 - Mid-Tex Gas Division Retirement 080.76557 37601 (759)
080 190 - Mid-Tex Gas Division Retirement 080.76557 37602 (2,615)
080 190 - Mid-Tex Gas Division Retirement 080.76557 37800 (41,130)
080 190 - Mid-Tex Gas Division Retirement 080.76557 38000 (3,100)
080 190 - Mid-Tex Gas Division Retirement 080.76571 37601 (702)
080 190 - Mid-Tex Gas Division Retirement 080.76571 37800 (119,310)
080 190 - Mid-Tex Gas Division Retirement 080.76575 37602 (2,457)
080 190 - Mid-Tex Gas Division Retirement 080.76575 37800 (165,944)
080 190 - Mid-Tex Gas Division Retirement 080.76580 37601 (226)
080 190 - Mid-Tex Gas Division Retirement 080.76580 37800 (10,835)
080 190 - Mid-Tex Gas Division Retirement 080.76582 37602 (449)
080 190 - Mid-Tex Gas Division Retirement 080.76582 38000 (152)
080 190 - Mid-Tex Gas Division Retirement 080.76587 37601 (21,910)
080 190 - Mid-Tex Gas Division Retirement 080.76587 37602 (254)
080 190 - Mid-Tex Gas Division Retirement 080.76590 37601 (118)
080 190 - Mid-Tex Gas Division Retirement 080.76590 37602 (2,039)
080 190 - Mid-Tex Gas Division Retirement 080.76590 38000 (1,119)
080 190 - Mid-Tex Gas Division Retirement 080.76591 37602 (38,673)
080 190 - Mid-Tex Gas Division Retirement 080.76598 37601 (376)
080 190 - Mid-Tex Gas Division Retirement 080.76598 37602 (693)
080 190 - Mid-Tex Gas Division Retirement 080.76628 37601 (2,127)
080 190 - Mid-Tex Gas Division Retirement 080.76628 37602 (254)
080 190 - Mid-Tex Gas Division Retirement 080.76628 38000 (3,960)
080 190 - Mid-Tex Gas Division Retirement 080.76633 37601 (696)
080 190 - Mid-Tex Gas Division Retirement 080.76638 37602 (32)
080 190 - Mid-Tex Gas Division Retirement 080.76638 37800 (58,553)
080 190 - Mid-Tex Gas Division Retirement 080.76644 37601 (159,678)
080 190 - Mid-Tex Gas Division Retirement 080.76644 37602 (79)
080 190 - Mid-Tex Gas Division Retirement 080.76644 38000 (15,374)
080 190 - Mid-Tex Gas Division Retirement 080.76650 37601 (3,775)
MTX Retirements by FERC
Page 22 of 30
568
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.76650 37602 (197)
080 190 - Mid-Tex Gas Division Retirement 080.76650 38000 (128)
080 190 - Mid-Tex Gas Division Retirement 080.76655 37601 (398)
080 190 - Mid-Tex Gas Division Retirement 080.76655 37602 (808)
080 190 - Mid-Tex Gas Division Retirement 080.76655 38000 (537)
080 190 - Mid-Tex Gas Division Retirement 080.76657 37601 (7,740)
080 190 - Mid-Tex Gas Division Retirement 080.76657 38000 (60,772)
080 190 - Mid-Tex Gas Division Retirement 080.76660 37601 (12,735)
080 190 - Mid-Tex Gas Division Retirement 080.76660 38000 (16,362)
080 190 - Mid-Tex Gas Division Retirement 080.76661 37601 (5,757)
080 190 - Mid-Tex Gas Division Retirement 080.76661 37602 (14,094)
080 190 - Mid-Tex Gas Division Retirement 080.76661 37800 (465)
080 190 - Mid-Tex Gas Division Retirement 080.76661 38000 (1,443)
080 190 - Mid-Tex Gas Division Retirement 080.76662 37601 (207)
080 190 - Mid-Tex Gas Division Retirement 080.76662 37602 (160)
080 190 - Mid-Tex Gas Division Retirement 080.76662 37800 (1,723)
080 190 - Mid-Tex Gas Division Retirement 080.76666 37601 (555)
080 190 - Mid-Tex Gas Division Retirement 080.76666 37602 (2,861)
080 190 - Mid-Tex Gas Division Retirement 080.76666 38000 (20,147)
080 190 - Mid-Tex Gas Division Retirement 080.76672 37601 (91)
080 190 - Mid-Tex Gas Division Retirement 080.76672 37602 (478)
080 190 - Mid-Tex Gas Division Retirement 080.76672 37800 (1,659)
080 190 - Mid-Tex Gas Division Retirement 080.76673 37602 (3,202)
080 190 - Mid-Tex Gas Division Retirement 080.76673 37800 (1,026)
080 190 - Mid-Tex Gas Division Retirement 080.76673 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.76680 37601 (307)
080 190 - Mid-Tex Gas Division Retirement 080.76680 37800 (2,923)
080 190 - Mid-Tex Gas Division Retirement 080.76681 37601 (327)
080 190 - Mid-Tex Gas Division Retirement 080.76681 37602 (655)
080 190 - Mid-Tex Gas Division Retirement 080.76681 37800 (1,257)
080 190 - Mid-Tex Gas Division Retirement 080.76682 37601 (13,759)
080 190 - Mid-Tex Gas Division Retirement 080.76682 37800 (208,654)
080 190 - Mid-Tex Gas Division Retirement 080.76682 38000 (6,928)
080 190 - Mid-Tex Gas Division Retirement 080.76684 37602 (688)
080 190 - Mid-Tex Gas Division Retirement 080.76684 37800 (1,324)
080 190 - Mid-Tex Gas Division Retirement 080.76684 38000 (680)
080 190 - Mid-Tex Gas Division Retirement 080.76686 37601 (3)
080 190 - Mid-Tex Gas Division Retirement 080.76686 37602 (1,686)
080 190 - Mid-Tex Gas Division Retirement 080.76686 37800 (2,012)
080 190 - Mid-Tex Gas Division Retirement 080.76695 37800 (971,515)
080 190 - Mid-Tex Gas Division Retirement 080.76697 37800 (161,320)
080 190 - Mid-Tex Gas Division Retirement 080.76711 37602 (377)
080 190 - Mid-Tex Gas Division Retirement 080.76713 37601 (866)
080 190 - Mid-Tex Gas Division Retirement 080.76713 37602 (8,347)
080 190 - Mid-Tex Gas Division Retirement 080.76713 38000 (1,245)
080 190 - Mid-Tex Gas Division Retirement 080.76714 38100 (12,703)
080 190 - Mid-Tex Gas Division Retirement 080.76724 37602 (721)
080 190 - Mid-Tex Gas Division Retirement 080.76726 37601 (172)
080 190 - Mid-Tex Gas Division Retirement 080.76726 37602 (782)
080 190 - Mid-Tex Gas Division Retirement 080.76731 37601 (19,281)
080 190 - Mid-Tex Gas Division Retirement 080.76731 38000 (46,823)
080 190 - Mid-Tex Gas Division Retirement 080.76733 37601 (418)
080 190 - Mid-Tex Gas Division Retirement 080.76733 37602 (1,375)
080 190 - Mid-Tex Gas Division Retirement 080.76738 37601 (245)
080 190 - Mid-Tex Gas Division Retirement 080.76738 37602 (149)
080 190 - Mid-Tex Gas Division Retirement 080.76738 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.76752 37601 (242)
080 190 - Mid-Tex Gas Division Retirement 080.76771 37601 (573)
080 190 - Mid-Tex Gas Division Retirement 080.76771 37602 (42)
080 190 - Mid-Tex Gas Division Retirement 080.76771 38000 (23)
080 190 - Mid-Tex Gas Division Retirement 080.76776 37602 (1,768)
080 190 - Mid-Tex Gas Division Retirement 080.76778 37602 (196)
080 190 - Mid-Tex Gas Division Retirement 080.76793 37601 (86)
080 190 - Mid-Tex Gas Division Retirement 080.76793 37602 (11)
080 190 - Mid-Tex Gas Division Retirement 080.76793 38000 (218)
080 190 - Mid-Tex Gas Division Retirement 080.76794 37601 (1,013)
080 190 - Mid-Tex Gas Division Retirement 080.76794 37602 (386)
080 190 - Mid-Tex Gas Division Retirement 080.76799 37601 (28,148)
080 190 - Mid-Tex Gas Division Retirement 080.76799 37602 (48,002)
080 190 - Mid-Tex Gas Division Retirement 080.76799 37800 (18,229)
080 190 - Mid-Tex Gas Division Retirement 080.76799 38000 (5,381)
080 190 - Mid-Tex Gas Division Retirement 080.76808 37602 (2,706)
080 190 - Mid-Tex Gas Division Retirement 080.76808 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.76814 37601 (12,297)
080 190 - Mid-Tex Gas Division Retirement 080.76814 38000 (5,591)
080 190 - Mid-Tex Gas Division Retirement 080.76819 37601 (1,011)
080 190 - Mid-Tex Gas Division Retirement 080.76819 38000 (8,086)
080 190 - Mid-Tex Gas Division Retirement 080.76823 37602 (4,746)
080 190 - Mid-Tex Gas Division Retirement 080.76823 38000 (358)
080 190 - Mid-Tex Gas Division Retirement 080.76826 37800 (485)
080 190 - Mid-Tex Gas Division Retirement 080.76831 37601 (49,459)
080 190 - Mid-Tex Gas Division Retirement 080.76831 37602 (6)
080 190 - Mid-Tex Gas Division Retirement 080.76833 37601 (158,456)
080 190 - Mid-Tex Gas Division Retirement 080.76835 37601 (7,638)
080 190 - Mid-Tex Gas Division Retirement 080.76835 37602 (946)
080 190 - Mid-Tex Gas Division Retirement 080.76835 38000 (8,153)
080 190 - Mid-Tex Gas Division Retirement 080.76841 37601 (1,808)
080 190 - Mid-Tex Gas Division Retirement 080.76841 38000 (8,073)
080 190 - Mid-Tex Gas Division Retirement 080.76842 37601 (1,339)
080 190 - Mid-Tex Gas Division Retirement 080.76842 37602 (718)
080 190 - Mid-Tex Gas Division Retirement 080.76842 38000 (8,945)
080 190 - Mid-Tex Gas Division Retirement 080.76846 37602 (28,552)
080 190 - Mid-Tex Gas Division Retirement 080.76848 37602 (684)
080 190 - Mid-Tex Gas Division Retirement 080.76858 37602 (12,537)
080 190 - Mid-Tex Gas Division Retirement 080.76862 37601 (2,176)
080 190 - Mid-Tex Gas Division Retirement 080.76864 37602 (18,698)
080 190 - Mid-Tex Gas Division Retirement 080.76864 38000 (6,394)
080 190 - Mid-Tex Gas Division Retirement 080.76867 37600 (5,644)
080 190 - Mid-Tex Gas Division Retirement 080.76873 38000 (13,160)
080 190 - Mid-Tex Gas Division Retirement 080.76888 37601 (150,831)
080 190 - Mid-Tex Gas Division Retirement 080.76888 37602 (243)
080 190 - Mid-Tex Gas Division Retirement 080.76888 38000 (1,038)
080 190 - Mid-Tex Gas Division Retirement 080.76889 37601 (5,575)
080 190 - Mid-Tex Gas Division Retirement 080.76889 38000 (15,899)
080 190 - Mid-Tex Gas Division Retirement 080.76890 37601 (18,344)
080 190 - Mid-Tex Gas Division Retirement 080.76890 38000 (15,789)
080 190 - Mid-Tex Gas Division Retirement 080.76891 38000 (17,889)
MTX Retirements by FERC
Page 23 of 30
569
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.76892 37601 (1,693)
080 190 - Mid-Tex Gas Division Retirement 080.76892 37602 (236)
080 190 - Mid-Tex Gas Division Retirement 080.76892 38000 (13,188)
080 190 - Mid-Tex Gas Division Retirement 080.76893 37601 (1,529)
080 190 - Mid-Tex Gas Division Retirement 080.76893 38000 (30,127)
080 190 - Mid-Tex Gas Division Retirement 080.76894 38000 (18,350)
080 190 - Mid-Tex Gas Division Retirement 080.76895 37601 (36,306)
080 190 - Mid-Tex Gas Division Retirement 080.76895 38000 (6,655)
080 190 - Mid-Tex Gas Division Retirement 080.76897 38000 (22,446)
080 190 - Mid-Tex Gas Division Retirement 080.76898 37601 (25,395)
080 190 - Mid-Tex Gas Division Retirement 080.76898 38000 (27,390)
080 190 - Mid-Tex Gas Division Retirement 080.76899 37601 (117,831)
080 190 - Mid-Tex Gas Division Retirement 080.76899 37602 (490)
080 190 - Mid-Tex Gas Division Retirement 080.76899 38000 (855)
080 190 - Mid-Tex Gas Division Retirement 080.76908 38000 (52,246)
080 190 - Mid-Tex Gas Division Retirement 080.76912 37601 (24,020)
080 190 - Mid-Tex Gas Division Retirement 080.76912 37602 (216,653)
080 190 - Mid-Tex Gas Division Retirement 080.76912 38000 (10,586)
080 190 - Mid-Tex Gas Division Retirement 080.76913 37601 (18,767)
080 190 - Mid-Tex Gas Division Retirement 080.76913 38000 (8,267)
080 190 - Mid-Tex Gas Division Retirement 080.76915 37601 (295,283)
080 190 - Mid-Tex Gas Division Retirement 080.76915 37602 (26,392)
080 190 - Mid-Tex Gas Division Retirement 080.76915 38000 (7,605)
080 190 - Mid-Tex Gas Division Retirement 080.76925 37601 (434)
080 190 - Mid-Tex Gas Division Retirement 080.76925 37602 (1,156)
080 190 - Mid-Tex Gas Division Retirement 080.76925 38000 (2,044)
080 190 - Mid-Tex Gas Division Retirement 080.76929 37601 (1,118)
080 190 - Mid-Tex Gas Division Retirement 080.76929 38000 (621)
080 190 - Mid-Tex Gas Division Retirement 080.76937 37601 (2,609)
080 190 - Mid-Tex Gas Division Retirement 080.76937 38000 (9,657)
080 190 - Mid-Tex Gas Division Retirement 080.76948 37602 (1,420)
080 190 - Mid-Tex Gas Division Retirement 080.76951 37601 (3,728)
080 190 - Mid-Tex Gas Division Retirement 080.76951 38000 (2,925)
080 190 - Mid-Tex Gas Division Retirement 080.76964 37602 (706)
080 190 - Mid-Tex Gas Division Retirement 080.76965 37601 (52,359)
080 190 - Mid-Tex Gas Division Retirement 080.76965 37602 (49)
080 190 - Mid-Tex Gas Division Retirement 080.76965 38000 (2,119)
080 190 - Mid-Tex Gas Division Retirement 080.76978 37601 (419)
080 190 - Mid-Tex Gas Division Retirement 080.76978 37602 (22)
080 190 - Mid-Tex Gas Division Retirement 080.76983 37601 (30,345)
080 190 - Mid-Tex Gas Division Retirement 080.76983 37602 (405)
080 190 - Mid-Tex Gas Division Retirement 080.76983 38000 (29)
080 190 - Mid-Tex Gas Division Retirement 080.76988 37601 (25)
080 190 - Mid-Tex Gas Division Retirement 080.76988 37602 (98)
080 190 - Mid-Tex Gas Division Retirement 080.76988 37800 (756)
080 190 - Mid-Tex Gas Division Retirement 080.76988 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.76989 37602 (81)
080 190 - Mid-Tex Gas Division Retirement 080.76989 38000 (576)
080 190 - Mid-Tex Gas Division Retirement 080.76992 37602 (3,828)
080 190 - Mid-Tex Gas Division Retirement 080.76993 37601 (2,588)
080 190 - Mid-Tex Gas Division Retirement 080.76993 37602 (705)
080 190 - Mid-Tex Gas Division Retirement 080.76993 38000 (454)
080 190 - Mid-Tex Gas Division Retirement 080.76998 37601 (42,140)
080 190 - Mid-Tex Gas Division Retirement 080.76998 38000 (13,540)
080 190 - Mid-Tex Gas Division Retirement 080.77000 37601 (641)
080 190 - Mid-Tex Gas Division Retirement 080.77000 38000 (1,226)
080 190 - Mid-Tex Gas Division Retirement 080.77012 37601 (2,551)
080 190 - Mid-Tex Gas Division Retirement 080.77012 37602 (10,154)
080 190 - Mid-Tex Gas Division Retirement 080.77012 38000 (36)
080 190 - Mid-Tex Gas Division Retirement 080.77013 37601 (943)
080 190 - Mid-Tex Gas Division Retirement 080.77013 38000 (2,370)
080 190 - Mid-Tex Gas Division Retirement 080.77026 37602 (6)
080 190 - Mid-Tex Gas Division Retirement 080.77031 37601 (1,275)
080 190 - Mid-Tex Gas Division Retirement 080.77031 37602 (1,456)
080 190 - Mid-Tex Gas Division Retirement 080.77031 38000 (6,805)
080 190 - Mid-Tex Gas Division Retirement 080.77038 37601 (501)
080 190 - Mid-Tex Gas Division Retirement 080.77038 37602 (1,983)
080 190 - Mid-Tex Gas Division Retirement 080.77038 38000 (14,050)
080 190 - Mid-Tex Gas Division Retirement 080.77039 37601 (2,110)
080 190 - Mid-Tex Gas Division Retirement 080.77039 37602 (440)
080 190 - Mid-Tex Gas Division Retirement 080.77039 38000 (1,803)
080 190 - Mid-Tex Gas Division Retirement 080.77041 37602 (12)
080 190 - Mid-Tex Gas Division Retirement 080.77042 37601 (11,164)
080 190 - Mid-Tex Gas Division Retirement 080.77043 37601 (6)
080 190 - Mid-Tex Gas Division Retirement 080.77043 37602 (189)
080 190 - Mid-Tex Gas Division Retirement 080.77043 37800 (770)
080 190 - Mid-Tex Gas Division Retirement 080.77046 37601 (228)
080 190 - Mid-Tex Gas Division Retirement 080.77046 37602 (1,815)
080 190 - Mid-Tex Gas Division Retirement 080.77046 38000 (6,555)
080 190 - Mid-Tex Gas Division Retirement 080.77048 37601 (3,050)
080 190 - Mid-Tex Gas Division Retirement 080.77048 38000 (6,670)
080 190 - Mid-Tex Gas Division Retirement 080.77049 37601 (4,758)
080 190 - Mid-Tex Gas Division Retirement 080.77049 38000 (12,199)
080 190 - Mid-Tex Gas Division Retirement 080.77051 37601 (112,822)
080 190 - Mid-Tex Gas Division Retirement 080.77051 37800 (13,534)
080 190 - Mid-Tex Gas Division Retirement 080.77054 37601 (1,277)
080 190 - Mid-Tex Gas Division Retirement 080.77054 37800 (24,551)
080 190 - Mid-Tex Gas Division Retirement 080.77055 37602 (1,743)
080 190 - Mid-Tex Gas Division Retirement 080.77055 38000 (1,590)
080 190 - Mid-Tex Gas Division Retirement 080.77057 37800 (11,661)
080 190 - Mid-Tex Gas Division Retirement 080.77058 37601 (5,646)
080 190 - Mid-Tex Gas Division Retirement 080.77058 37602 (50)
080 190 - Mid-Tex Gas Division Retirement 080.77058 37800 (837)
080 190 - Mid-Tex Gas Division Retirement 080.77062 37601 (43)
080 190 - Mid-Tex Gas Division Retirement 080.77062 37602 (6)
080 190 - Mid-Tex Gas Division Retirement 080.77062 37800 (27,195)
080 190 - Mid-Tex Gas Division Retirement 080.77064 37601 (52)
080 190 - Mid-Tex Gas Division Retirement 080.77064 37800 (45,983)
080 190 - Mid-Tex Gas Division Retirement 080.77069 37601 (965)
080 190 - Mid-Tex Gas Division Retirement 080.77073 37602 (149)
080 190 - Mid-Tex Gas Division Retirement 080.77073 37800 (95)
080 190 - Mid-Tex Gas Division Retirement 080.77078 37601 (2,559)
080 190 - Mid-Tex Gas Division Retirement 080.77078 38000 (2,594)
080 190 - Mid-Tex Gas Division Retirement 080.77080 37601 (343)
080 190 - Mid-Tex Gas Division Retirement 080.77080 38000 (121)
080 190 - Mid-Tex Gas Division Retirement 080.77086 37601 (729)
080 190 - Mid-Tex Gas Division Retirement 080.77086 37602 (51)
MTX Retirements by FERC
Page 24 of 30
570
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.77086 38000 (356)
080 190 - Mid-Tex Gas Division Retirement 080.77087 38000 (153)
080 190 - Mid-Tex Gas Division Retirement 080.77091 37601 (760)
080 190 - Mid-Tex Gas Division Retirement 080.77091 37602 (4,863)
080 190 - Mid-Tex Gas Division Retirement 080.77091 38000 (2,047)
080 190 - Mid-Tex Gas Division Retirement 080.77110 37601 (18)
080 190 - Mid-Tex Gas Division Retirement 080.77110 37800 (6,595)
080 190 - Mid-Tex Gas Division Retirement 080.77111 37601 (15,235)
080 190 - Mid-Tex Gas Division Retirement 080.77113 37601 (1,795)
080 190 - Mid-Tex Gas Division Retirement 080.77113 37602 (709)
080 190 - Mid-Tex Gas Division Retirement 080.77113 38000 (12,488)
080 190 - Mid-Tex Gas Division Retirement 080.77114 37601 (3,406)
080 190 - Mid-Tex Gas Division Retirement 080.77114 37602 (692)
080 190 - Mid-Tex Gas Division Retirement 080.77114 38000 (1,094)
080 190 - Mid-Tex Gas Division Retirement 080.77156 37602 (9,746)
080 190 - Mid-Tex Gas Division Retirement 080.77167 37601 (139,377)
080 190 - Mid-Tex Gas Division Retirement 080.77167 38000 (7,805)
080 190 - Mid-Tex Gas Division Retirement 080.77198 37601 (2,832)
080 190 - Mid-Tex Gas Division Retirement 080.77198 37602 (1,019)
080 190 - Mid-Tex Gas Division Retirement 080.77198 37800 (67,965)
080 190 - Mid-Tex Gas Division Retirement 080.77208 37601 (280)
080 190 - Mid-Tex Gas Division Retirement 080.77208 38000 (4,117)
080 190 - Mid-Tex Gas Division Retirement 080.77217 37601 (1,457)
080 190 - Mid-Tex Gas Division Retirement 080.77217 38000 (148)
080 190 - Mid-Tex Gas Division Retirement 080.77218 38000 (4,730)
080 190 - Mid-Tex Gas Division Retirement 080.77219 37601 (66)
080 190 - Mid-Tex Gas Division Retirement 080.77219 37602 (45)
080 190 - Mid-Tex Gas Division Retirement 080.77219 38000 (4,272)
080 190 - Mid-Tex Gas Division Retirement 080.77220 37601 (545)
080 190 - Mid-Tex Gas Division Retirement 080.77220 37602 (1,811)
080 190 - Mid-Tex Gas Division Retirement 080.77220 38000 (1,290)
080 190 - Mid-Tex Gas Division Retirement 080.77224 37601 (1,261)
080 190 - Mid-Tex Gas Division Retirement 080.77224 37602 (4,652)
080 190 - Mid-Tex Gas Division Retirement 080.77224 38000 (1,473)
080 190 - Mid-Tex Gas Division Retirement 080.77263 38000 (4,582)
080 190 - Mid-Tex Gas Division Retirement 080.77264 37601 (2,215)
080 190 - Mid-Tex Gas Division Retirement 080.77264 38000 (4,882)
080 190 - Mid-Tex Gas Division Retirement 080.77265 37601 (1,051)
080 190 - Mid-Tex Gas Division Retirement 080.77265 38000 (1,526)
080 190 - Mid-Tex Gas Division Retirement 080.77267 37601 (3,352)
080 190 - Mid-Tex Gas Division Retirement 080.77267 37602 (5,080)
080 190 - Mid-Tex Gas Division Retirement 080.77267 38000 (10)
080 190 - Mid-Tex Gas Division Retirement 080.77282 37601 (495)
080 190 - Mid-Tex Gas Division Retirement 080.77282 37602 (166)
080 190 - Mid-Tex Gas Division Retirement 080.77288 37601 (162)
080 190 - Mid-Tex Gas Division Retirement 080.77291 37601 (1,167)
080 190 - Mid-Tex Gas Division Retirement 080.77291 37602 (410)
080 190 - Mid-Tex Gas Division Retirement 080.77291 38000 (1,111)
080 190 - Mid-Tex Gas Division Retirement 080.77294 37602 (42,607)
080 190 - Mid-Tex Gas Division Retirement 080.77296 37602 (32,838)
080 190 - Mid-Tex Gas Division Retirement 080.77296 38000 (3)
080 190 - Mid-Tex Gas Division Retirement 080.77297 37601 (5,459)
080 190 - Mid-Tex Gas Division Retirement 080.77297 37602 (2,117)
080 190 - Mid-Tex Gas Division Retirement 080.77297 38000 (40)
080 190 - Mid-Tex Gas Division Retirement 080.77305 37601 (297,774)
080 190 - Mid-Tex Gas Division Retirement 080.77305 37602 (678)
080 190 - Mid-Tex Gas Division Retirement 080.77305 37800 (51,659)
080 190 - Mid-Tex Gas Division Retirement 080.77305 38000 (7,039)
080 190 - Mid-Tex Gas Division Retirement 080.77311 37601 (353)
080 190 - Mid-Tex Gas Division Retirement 080.77311 37602 (6,180)
080 190 - Mid-Tex Gas Division Retirement 080.77311 38000 (3,841)
080 190 - Mid-Tex Gas Division Retirement 080.77319 37602 (22,971)
080 190 - Mid-Tex Gas Division Retirement 080.77319 38000 (3,034)
080 190 - Mid-Tex Gas Division Retirement 080.77322 37601 (780)
080 190 - Mid-Tex Gas Division Retirement 080.77322 37602 (437)
080 190 - Mid-Tex Gas Division Retirement 080.77328 37601 (2,216)
080 190 - Mid-Tex Gas Division Retirement 080.77328 37602 (2,578)
080 190 - Mid-Tex Gas Division Retirement 080.77328 38000 (2,243)
080 190 - Mid-Tex Gas Division Retirement 080.77341 37601 (1,254)
080 190 - Mid-Tex Gas Division Retirement 080.77341 37602 (121)
080 190 - Mid-Tex Gas Division Retirement 080.77341 38000 (4,576)
080 190 - Mid-Tex Gas Division Retirement 080.77348 37602 (3,932)
080 190 - Mid-Tex Gas Division Retirement 080.77348 38000 (158)
080 190 - Mid-Tex Gas Division Retirement 080.77351 37602 (3,493)
080 190 - Mid-Tex Gas Division Retirement 080.77352 37800 (10,664)
080 190 - Mid-Tex Gas Division Retirement 080.77357 37601 (223)
080 190 - Mid-Tex Gas Division Retirement 080.77357 37602 (3,413)
080 190 - Mid-Tex Gas Division Retirement 080.77357 38000 (217)
080 190 - Mid-Tex Gas Division Retirement 080.77371 37601 (422)
080 190 - Mid-Tex Gas Division Retirement 080.77374 37602 (1,680)
080 190 - Mid-Tex Gas Division Retirement 080.77383 37601 (42,050)
080 190 - Mid-Tex Gas Division Retirement 080.77384 37601 (2,997)
080 190 - Mid-Tex Gas Division Retirement 080.77384 38000 (938)
080 190 - Mid-Tex Gas Division Retirement 080.77387 37602 (1,180)
080 190 - Mid-Tex Gas Division Retirement 080.77389 37602 (783)
080 190 - Mid-Tex Gas Division Retirement 080.77394 37601 (445)
080 190 - Mid-Tex Gas Division Retirement 080.77394 37602 (648)
080 190 - Mid-Tex Gas Division Retirement 080.77394 38000 (4,116)
080 190 - Mid-Tex Gas Division Retirement 080.77396 37601 (2,783)
080 190 - Mid-Tex Gas Division Retirement 080.77396 37800 (37,413)
080 190 - Mid-Tex Gas Division Retirement 080.77401 37601 (7,062)
080 190 - Mid-Tex Gas Division Retirement 080.77401 37602 (7,398)
080 190 - Mid-Tex Gas Division Retirement 080.77401 38000 (12,443)
080 190 - Mid-Tex Gas Division Retirement 080.77414 37601 (244,500)
080 190 - Mid-Tex Gas Division Retirement 080.77414 38000 (22,428)
080 190 - Mid-Tex Gas Division Retirement 080.77422 37601 (816)
080 190 - Mid-Tex Gas Division Retirement 080.77422 37602 (1,516)
080 190 - Mid-Tex Gas Division Retirement 080.77422 38000 (16,414)
080 190 - Mid-Tex Gas Division Retirement 080.77424 37601 (247)
080 190 - Mid-Tex Gas Division Retirement 080.77424 38000 (572)
080 190 - Mid-Tex Gas Division Retirement 080.77427 37601 (120)
080 190 - Mid-Tex Gas Division Retirement 080.77428 37601 (1,664)
080 190 - Mid-Tex Gas Division Retirement 080.77428 37602 (3,378)
080 190 - Mid-Tex Gas Division Retirement 080.77428 38000 (4,035)
080 190 - Mid-Tex Gas Division Retirement 080.77429 37601 (11,344)
080 190 - Mid-Tex Gas Division Retirement 080.77429 37602 (6,017)
080 190 - Mid-Tex Gas Division Retirement 080.77429 38000 (19,306)
MTX Retirements by FERC
Page 25 of 30
571
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.77430 37602 (26,398)
080 190 - Mid-Tex Gas Division Retirement 080.77430 38000 (251)
080 190 - Mid-Tex Gas Division Retirement 080.77432 37601 (25,715)
080 190 - Mid-Tex Gas Division Retirement 080.77432 37602 (939)
080 190 - Mid-Tex Gas Division Retirement 080.77432 38000 (8,663)
080 190 - Mid-Tex Gas Division Retirement 080.77434 37601 (1,066)
080 190 - Mid-Tex Gas Division Retirement 080.77434 37602 (693)
080 190 - Mid-Tex Gas Division Retirement 080.77434 38000 (9,588)
080 190 - Mid-Tex Gas Division Retirement 080.77435 37601 (28,259)
080 190 - Mid-Tex Gas Division Retirement 080.77435 37602 (2,711)
080 190 - Mid-Tex Gas Division Retirement 080.77435 38000 (1,636)
080 190 - Mid-Tex Gas Division Retirement 080.77441 37602 (387)
080 190 - Mid-Tex Gas Division Retirement 080.77445 38000 (5,254)
080 190 - Mid-Tex Gas Division Retirement 080.77448 37601 (19,709)
080 190 - Mid-Tex Gas Division Retirement 080.77448 37602 (396)
080 190 - Mid-Tex Gas Division Retirement 080.77448 38000 (5,136)
080 190 - Mid-Tex Gas Division Retirement 080.77452 37601 (76)
080 190 - Mid-Tex Gas Division Retirement 080.77452 38000 (163)
080 190 - Mid-Tex Gas Division Retirement 080.77456 37601 (293)
080 190 - Mid-Tex Gas Division Retirement 080.77456 38000 (862)
080 190 - Mid-Tex Gas Division Retirement 080.77459 37601 (977)
080 190 - Mid-Tex Gas Division Retirement 080.77459 38000 (2,579)
080 190 - Mid-Tex Gas Division Retirement 080.77461 37601 (202)
080 190 - Mid-Tex Gas Division Retirement 080.77461 37602 (1,325)
080 190 - Mid-Tex Gas Division Retirement 080.77461 37800 (827)
080 190 - Mid-Tex Gas Division Retirement 080.77461 38000 (549)
080 190 - Mid-Tex Gas Division Retirement 080.77463 37601 (179)
080 190 - Mid-Tex Gas Division Retirement 080.77474 37601 (168)
080 190 - Mid-Tex Gas Division Retirement 080.77505 38000 (6,389)
080 190 - Mid-Tex Gas Division Retirement 080.77506 37601 (42,063)
080 190 - Mid-Tex Gas Division Retirement 080.77506 37602 (50,254)
080 190 - Mid-Tex Gas Division Retirement 080.77506 38000 (13,475)
080 190 - Mid-Tex Gas Division Retirement 080.77517 37601 (302)
080 190 - Mid-Tex Gas Division Retirement 080.77517 37602 (2,353)
080 190 - Mid-Tex Gas Division Retirement 080.77517 38000 (28,512)
080 190 - Mid-Tex Gas Division Retirement 080.77519 37602 (11,094)
080 190 - Mid-Tex Gas Division Retirement 080.77519 38000 (10,687)
080 190 - Mid-Tex Gas Division Retirement 080.77520 37602 (10,545)
080 190 - Mid-Tex Gas Division Retirement 080.77520 38000 (12,795)
080 190 - Mid-Tex Gas Division Retirement 080.77521 37601 (478)
080 190 - Mid-Tex Gas Division Retirement 080.77521 37602 (4,521)
080 190 - Mid-Tex Gas Division Retirement 080.77521 37800 (646,051)
080 190 - Mid-Tex Gas Division Retirement 080.77521 38000 (8,755)
080 190 - Mid-Tex Gas Division Retirement 080.77532 37601 (142,016)
080 190 - Mid-Tex Gas Division Retirement 080.77532 38000 (1,040)
080 190 - Mid-Tex Gas Division Retirement 080.77533 37601 (58,579)
080 190 - Mid-Tex Gas Division Retirement 080.77533 38000 (4,119)
080 190 - Mid-Tex Gas Division Retirement 080.77545 37602 (2,147)
080 190 - Mid-Tex Gas Division Retirement 080.77545 38000 (6,575)
080 190 - Mid-Tex Gas Division Retirement 080.77547 38000 (41)
080 190 - Mid-Tex Gas Division Retirement 080.77548 37601 (37,135)
080 190 - Mid-Tex Gas Division Retirement 080.77548 37602 (852)
080 190 - Mid-Tex Gas Division Retirement 080.77548 37800 (108,307)
080 190 - Mid-Tex Gas Division Retirement 080.77552 37601 (1,117)
080 190 - Mid-Tex Gas Division Retirement 080.77552 38000 (15,968)
080 190 - Mid-Tex Gas Division Retirement 080.77570 38000 (49,370)
080 190 - Mid-Tex Gas Division Retirement 080.77577 37602 (188)
080 190 - Mid-Tex Gas Division Retirement 080.77578 39000 (8)
080 190 - Mid-Tex Gas Division Retirement 080.77594 37800 (428)
080 190 - Mid-Tex Gas Division Retirement 080.77595 38000 (707)
080 190 - Mid-Tex Gas Division Retirement 080.77596 37601 (180,964)
080 190 - Mid-Tex Gas Division Retirement 080.77596 37602 (156)
080 190 - Mid-Tex Gas Division Retirement 080.77596 38000 (3,814)
080 190 - Mid-Tex Gas Division Retirement 080.77598 37601 (5,219)
080 190 - Mid-Tex Gas Division Retirement 080.77598 37800 (251,305)
080 190 - Mid-Tex Gas Division Retirement 080.77598 38000 (2,061)
080 190 - Mid-Tex Gas Division Retirement 080.77615 37601 (3,062)
080 190 - Mid-Tex Gas Division Retirement 080.77616 37601 (10,030)
080 190 - Mid-Tex Gas Division Retirement 080.77616 37602 (479)
080 190 - Mid-Tex Gas Division Retirement 080.77616 37800 (18,121)
080 190 - Mid-Tex Gas Division Retirement 080.77616 38000 (11,299)
080 190 - Mid-Tex Gas Division Retirement 080.77634 37800 (16,591)
080 190 - Mid-Tex Gas Division Retirement 080.77637 37602 (797)
080 190 - Mid-Tex Gas Division Retirement 080.77648 37601 (5)
080 190 - Mid-Tex Gas Division Retirement 080.77648 37800 (5,739)
080 190 - Mid-Tex Gas Division Retirement 080.77670 37601 (2)
080 190 - Mid-Tex Gas Division Retirement 080.77670 37602 (3,346)
080 190 - Mid-Tex Gas Division Retirement 080.77670 37800 (542,809)
080 190 - Mid-Tex Gas Division Retirement 080.77670 38000 (4,784)
080 190 - Mid-Tex Gas Division Retirement 080.77673 37602 (6,960)
080 190 - Mid-Tex Gas Division Retirement 080.77674 37602 (6,476)
080 190 - Mid-Tex Gas Division Retirement 080.77674 37800 (12,393)
080 190 - Mid-Tex Gas Division Retirement 080.77674 38000 (220)
080 190 - Mid-Tex Gas Division Retirement 080.77675 37602 (1,400)
080 190 - Mid-Tex Gas Division Retirement 080.77675 38000 (5,602)
080 190 - Mid-Tex Gas Division Retirement 080.77693 37601 (23,216)
080 190 - Mid-Tex Gas Division Retirement 080.77708 37601 (22,294)
080 190 - Mid-Tex Gas Division Retirement 080.77708 38000 (1,020)
080 190 - Mid-Tex Gas Division Retirement 080.77710 37601 (158,170)
080 190 - Mid-Tex Gas Division Retirement 080.77710 37602 (108)
080 190 - Mid-Tex Gas Division Retirement 080.77710 38000 (2,746)
080 190 - Mid-Tex Gas Division Retirement 080.77714 37601 (1,097)
080 190 - Mid-Tex Gas Division Retirement 080.77714 37602 (262)
080 190 - Mid-Tex Gas Division Retirement 080.77714 38000 (4,007)
080 190 - Mid-Tex Gas Division Retirement 080.77715 37601 (44,415)
080 190 - Mid-Tex Gas Division Retirement 080.77715 37602 (437)
080 190 - Mid-Tex Gas Division Retirement 080.77715 38000 (2,867)
080 190 - Mid-Tex Gas Division Retirement 080.77716 37601 (131,072)
080 190 - Mid-Tex Gas Division Retirement 080.77716 37602 (7,187)
080 190 - Mid-Tex Gas Division Retirement 080.77716 38000 (5,450)
080 190 - Mid-Tex Gas Division Retirement 080.77717 37601 (852)
080 190 - Mid-Tex Gas Division Retirement 080.77717 37602 (5,091)
080 190 - Mid-Tex Gas Division Retirement 080.77717 38000 (7,121)
080 190 - Mid-Tex Gas Division Retirement 080.77721 37601 (593)
080 190 - Mid-Tex Gas Division Retirement 080.77721 37602 (3,984)
080 190 - Mid-Tex Gas Division Retirement 080.77721 38000 (13,983)
080 190 - Mid-Tex Gas Division Retirement 080.77724 37601 (283)
MTX Retirements by FERC
Page 26 of 30
572
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.77724 38000 (716)
080 190 - Mid-Tex Gas Division Retirement 080.77730 37601 (3,880)
080 190 - Mid-Tex Gas Division Retirement 080.77730 37602 (777)
080 190 - Mid-Tex Gas Division Retirement 080.77730 38000 (1,426)
080 190 - Mid-Tex Gas Division Retirement 080.77736 37602 (3,171)
080 190 - Mid-Tex Gas Division Retirement 080.77743 37602 (1,085)
080 190 - Mid-Tex Gas Division Retirement 080.77743 38000 (3,121)
080 190 - Mid-Tex Gas Division Retirement 080.77746 37601 (362)
080 190 - Mid-Tex Gas Division Retirement 080.77746 37602 (143)
080 190 - Mid-Tex Gas Division Retirement 080.77746 38000 (1,346)
080 190 - Mid-Tex Gas Division Retirement 080.77749 37602 (18,522)
080 190 - Mid-Tex Gas Division Retirement 080.77750 37601 (129,601)
080 190 - Mid-Tex Gas Division Retirement 080.77750 38000 (4,272)
080 190 - Mid-Tex Gas Division Retirement 080.77751 37601 (2,616)
080 190 - Mid-Tex Gas Division Retirement 080.77751 37602 (2,193)
080 190 - Mid-Tex Gas Division Retirement 080.77751 38000 (4,362)
080 190 - Mid-Tex Gas Division Retirement 080.77755 37601 (220,499)
080 190 - Mid-Tex Gas Division Retirement 080.77755 38000 (1,809)
080 190 - Mid-Tex Gas Division Retirement 080.77756 37601 (9)
080 190 - Mid-Tex Gas Division Retirement 080.77756 37800 (38,640)
080 190 - Mid-Tex Gas Division Retirement 080.77760 37602 (410)
080 190 - Mid-Tex Gas Division Retirement 080.77760 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.77764 37602 (6,243)
080 190 - Mid-Tex Gas Division Retirement 080.77764 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.77771 37602 (99)
080 190 - Mid-Tex Gas Division Retirement 080.77771 38000 (4,424)
080 190 - Mid-Tex Gas Division Retirement 080.77772 37800 (2,557)
080 190 - Mid-Tex Gas Division Retirement 080.77786 37601 (126)
080 190 - Mid-Tex Gas Division Retirement 080.77790 37601 (2,743)
080 190 - Mid-Tex Gas Division Retirement 080.77790 37602 (4,003)
080 190 - Mid-Tex Gas Division Retirement 080.77791 37601 (20,839)
080 190 - Mid-Tex Gas Division Retirement 080.77791 38000 (8,391)
080 190 - Mid-Tex Gas Division Retirement 080.77802 37602 (462)
080 190 - Mid-Tex Gas Division Retirement 080.77810 37601 (9,930)
080 190 - Mid-Tex Gas Division Retirement 080.77810 38000 (16,853)
080 190 - Mid-Tex Gas Division Retirement 080.77812 37601 (1,963)
080 190 - Mid-Tex Gas Division Retirement 080.77812 38000 (16,140)
080 190 - Mid-Tex Gas Division Retirement 080.77819 37601 (1,128)
080 190 - Mid-Tex Gas Division Retirement 080.77819 38000 (485)
080 190 - Mid-Tex Gas Division Retirement 080.77823 37601 (2,116)
080 190 - Mid-Tex Gas Division Retirement 080.77823 37602 (4,912)
080 190 - Mid-Tex Gas Division Retirement 080.77823 38000 (86)
080 190 - Mid-Tex Gas Division Retirement 080.77825 37601 (1,013)
080 190 - Mid-Tex Gas Division Retirement 080.77825 38000 (486)
080 190 - Mid-Tex Gas Division Retirement 080.77826 37601 (83,818)
080 190 - Mid-Tex Gas Division Retirement 080.77826 38000 (4,119)
080 190 - Mid-Tex Gas Division Retirement 080.77833 37602 (1,021)
080 190 - Mid-Tex Gas Division Retirement 080.77840 37601 (8,680)
080 190 - Mid-Tex Gas Division Retirement 080.77840 38000 (143)
080 190 - Mid-Tex Gas Division Retirement 080.77854 37601 (370)
080 190 - Mid-Tex Gas Division Retirement 080.77854 37602 (156)
080 190 - Mid-Tex Gas Division Retirement 080.77854 38000 (1,086)
080 190 - Mid-Tex Gas Division Retirement 080.77860 37601 (3,094)
080 190 - Mid-Tex Gas Division Retirement 080.77860 37602 (29)
080 190 - Mid-Tex Gas Division Retirement 080.77860 38000 (4)
080 190 - Mid-Tex Gas Division Retirement 080.77865 37601 (2,819)
080 190 - Mid-Tex Gas Division Retirement 080.77865 37602 (4)
080 190 - Mid-Tex Gas Division Retirement 080.77865 38000 (1,298)
080 190 - Mid-Tex Gas Division Retirement 080.77867 37601 (8)
080 190 - Mid-Tex Gas Division Retirement 080.77867 37602 (732)
080 190 - Mid-Tex Gas Division Retirement 080.77867 37800 (44,227)
080 190 - Mid-Tex Gas Division Retirement 080.77894 37601 (5)
080 190 - Mid-Tex Gas Division Retirement 080.77894 37800 (523)
080 190 - Mid-Tex Gas Division Retirement 080.77898 37601 (377)
080 190 - Mid-Tex Gas Division Retirement 080.77899 37601 (157)
080 190 - Mid-Tex Gas Division Retirement 080.77899 37602 (211)
080 190 - Mid-Tex Gas Division Retirement 080.77899 38000 (1,068)
080 190 - Mid-Tex Gas Division Retirement 080.77905 38000 (79)
080 190 - Mid-Tex Gas Division Retirement 080.77909 37601 (64)
080 190 - Mid-Tex Gas Division Retirement 080.77912 37601 (443)
080 190 - Mid-Tex Gas Division Retirement 080.77912 38000 (5,618)
080 190 - Mid-Tex Gas Division Retirement 080.77914 38000 (99)
080 190 - Mid-Tex Gas Division Retirement 080.77916 37601 (550)
080 190 - Mid-Tex Gas Division Retirement 080.77916 37602 (431)
080 190 - Mid-Tex Gas Division Retirement 080.77916 38000 (1,555)
080 190 - Mid-Tex Gas Division Retirement 080.77920 37601 (2,145)
080 190 - Mid-Tex Gas Division Retirement 080.77920 38000 (2,441)
080 190 - Mid-Tex Gas Division Retirement 080.77921 37602 (57)
080 190 - Mid-Tex Gas Division Retirement 080.77921 37800 (20,445)
080 190 - Mid-Tex Gas Division Retirement 080.77922 37800 (7,395)
080 190 - Mid-Tex Gas Division Retirement 080.77923 37601 (55)
080 190 - Mid-Tex Gas Division Retirement 080.77923 37800 (1,338)
080 190 - Mid-Tex Gas Division Retirement 080.77924 37601 (1,646)
080 190 - Mid-Tex Gas Division Retirement 080.77924 37800 (5,176)
080 190 - Mid-Tex Gas Division Retirement 080.77925 37601 (901)
080 190 - Mid-Tex Gas Division Retirement 080.77925 37800 (15,307)
080 190 - Mid-Tex Gas Division Retirement 080.77926 37601 (9,956)
080 190 - Mid-Tex Gas Division Retirement 080.77926 37800 (1,943)
080 190 - Mid-Tex Gas Division Retirement 080.77927 37601 (22)
080 190 - Mid-Tex Gas Division Retirement 080.77927 37800 (26,655)
080 190 - Mid-Tex Gas Division Retirement 080.77928 37800 (3,498)
080 190 - Mid-Tex Gas Division Retirement 080.77929 37800 (3,998)
080 190 - Mid-Tex Gas Division Retirement 080.77930 37601 (38)
080 190 - Mid-Tex Gas Division Retirement 080.77930 37800 (4,505)
080 190 - Mid-Tex Gas Division Retirement 080.77932 37800 1,558
080 190 - Mid-Tex Gas Division Retirement 080.77933 37602 (4)
080 190 - Mid-Tex Gas Division Retirement 080.77933 37800 (5,905)
080 190 - Mid-Tex Gas Division Retirement 080.77934 37602 (21)
080 190 - Mid-Tex Gas Division Retirement 080.77934 37800 (1,354)
080 190 - Mid-Tex Gas Division Retirement 080.77941 37601 (150)
080 190 - Mid-Tex Gas Division Retirement 080.77960 38000 (4,119)
080 190 - Mid-Tex Gas Division Retirement 080.77961 37602 (547)
080 190 - Mid-Tex Gas Division Retirement 080.77970 37601 (130)
080 190 - Mid-Tex Gas Division Retirement 080.77970 37602 (1,753)
080 190 - Mid-Tex Gas Division Retirement 080.77970 38000 (6,040)
080 190 - Mid-Tex Gas Division Retirement 080.77971 37601 (467)
080 190 - Mid-Tex Gas Division Retirement 080.77971 38000 (610)
MTX Retirements by FERC
Page 27 of 30
573
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.77972 37601 (170)
080 190 - Mid-Tex Gas Division Retirement 080.77972 37602 (2,426)
080 190 - Mid-Tex Gas Division Retirement 080.77972 38000 (1,311)
080 190 - Mid-Tex Gas Division Retirement 080.77985 37601 (12,262)
080 190 - Mid-Tex Gas Division Retirement 080.77985 38000 (6,407)
080 190 - Mid-Tex Gas Division Retirement 080.78001 37602 (1,766)
080 190 - Mid-Tex Gas Division Retirement 080.78014 37601 (47,580)
080 190 - Mid-Tex Gas Division Retirement 080.78014 37602 (7,568)
080 190 - Mid-Tex Gas Division Retirement 080.78014 38000 (2,136)
080 190 - Mid-Tex Gas Division Retirement 080.78030 37601 (1,026)
080 190 - Mid-Tex Gas Division Retirement 080.78030 37602 (345)
080 190 - Mid-Tex Gas Division Retirement 080.78030 38000 (73)
080 190 - Mid-Tex Gas Division Retirement 080.78049 38000 (294)
080 190 - Mid-Tex Gas Division Retirement 080.78064 37602 (5,354)
080 190 - Mid-Tex Gas Division Retirement 080.78064 38000 (6,834)
080 190 - Mid-Tex Gas Division Retirement 080.78075 37601 (83,141)
080 190 - Mid-Tex Gas Division Retirement 080.78075 37602 (30,166)
080 190 - Mid-Tex Gas Division Retirement 080.78075 38000 (375)
080 190 - Mid-Tex Gas Division Retirement 080.78081 37601 (297)
080 190 - Mid-Tex Gas Division Retirement 080.78081 38000 (649)
080 190 - Mid-Tex Gas Division Retirement 080.78092 37800 (7,837)
080 190 - Mid-Tex Gas Division Retirement 080.78093 37601 (459)
080 190 - Mid-Tex Gas Division Retirement 080.78097 37601 (20)
080 190 - Mid-Tex Gas Division Retirement 080.78097 37602 (14)
080 190 - Mid-Tex Gas Division Retirement 080.78097 37800 (2,101)
080 190 - Mid-Tex Gas Division Retirement 080.78104 37601 (842)
080 190 - Mid-Tex Gas Division Retirement 080.78104 37602 (412)
080 190 - Mid-Tex Gas Division Retirement 080.78105 37601 (5,988)
080 190 - Mid-Tex Gas Division Retirement 080.78105 37800 (57,298)
080 190 - Mid-Tex Gas Division Retirement 080.78107 39000 (2,060)
080 190 - Mid-Tex Gas Division Retirement 080.78109 37601 (79,018)
080 190 - Mid-Tex Gas Division Retirement 080.78109 38000 (3,204)
080 190 - Mid-Tex Gas Division Retirement 080.78113 37601 (395)
080 190 - Mid-Tex Gas Division Retirement 080.78125 37601 (39,547)
080 190 - Mid-Tex Gas Division Retirement 080.78133 37601 (16,294)
080 190 - Mid-Tex Gas Division Retirement 080.78133 37602 (10,403)
080 190 - Mid-Tex Gas Division Retirement 080.78133 38000 (4,379)
080 190 - Mid-Tex Gas Division Retirement 080.78145 37601 (208)
080 190 - Mid-Tex Gas Division Retirement 080.78145 38000 (173)
080 190 - Mid-Tex Gas Division Retirement 080.78149 37601 (880)
080 190 - Mid-Tex Gas Division Retirement 080.78169 37601 (337)
080 190 - Mid-Tex Gas Division Retirement 080.78169 38000 (2,044)
080 190 - Mid-Tex Gas Division Retirement 080.78172 37601 (6,190)
080 190 - Mid-Tex Gas Division Retirement 080.78172 37602 (8,260)
080 190 - Mid-Tex Gas Division Retirement 080.78172 38000 (1,575)
080 190 - Mid-Tex Gas Division Retirement 080.78173 37601 (404)
080 190 - Mid-Tex Gas Division Retirement 080.78173 37602 (363)
080 190 - Mid-Tex Gas Division Retirement 080.78173 38000 (1,064)
080 190 - Mid-Tex Gas Division Retirement 080.78184 37601 (748)
080 190 - Mid-Tex Gas Division Retirement 080.78184 37602 (6,911)
080 190 - Mid-Tex Gas Division Retirement 080.78184 37800 (8,747)
080 190 - Mid-Tex Gas Division Retirement 080.78184 38000 (1,262)
080 190 - Mid-Tex Gas Division Retirement 080.78189 37601 (11,421)
080 190 - Mid-Tex Gas Division Retirement 080.78189 37602 (761)
080 190 - Mid-Tex Gas Division Retirement 080.78189 38000 (6,538)
080 190 - Mid-Tex Gas Division Retirement 080.78193 37601 (8,530)
080 190 - Mid-Tex Gas Division Retirement 080.78193 37602 (54)
080 190 - Mid-Tex Gas Division Retirement 080.78193 38000 (1,469)
080 190 - Mid-Tex Gas Division Retirement 080.78194 37601 (7,432)
080 190 - Mid-Tex Gas Division Retirement 080.78194 37602 (10,624)
080 190 - Mid-Tex Gas Division Retirement 080.78194 38000 (3,575)
080 190 - Mid-Tex Gas Division Retirement 080.78226 38000 (1,543)
080 190 - Mid-Tex Gas Division Retirement 080.78229 37601 (287)
080 190 - Mid-Tex Gas Division Retirement 080.78229 38000 (200)
080 190 - Mid-Tex Gas Division Retirement 080.78230 37601 (1,923)
080 190 - Mid-Tex Gas Division Retirement 080.78230 37602 (935)
080 190 - Mid-Tex Gas Division Retirement 080.78230 37800 (1,174)
080 190 - Mid-Tex Gas Division Retirement 080.78230 38000 (3,431)
080 190 - Mid-Tex Gas Division Retirement 080.78233 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.78234 37602 (7,219)
080 190 - Mid-Tex Gas Division Retirement 080.78247 37602 (232)
080 190 - Mid-Tex Gas Division Retirement 080.78265 37601 (380)
080 190 - Mid-Tex Gas Division Retirement 080.78265 37800 (3,356)
080 190 - Mid-Tex Gas Division Retirement 080.78300 37601 (399)
080 190 - Mid-Tex Gas Division Retirement 080.78300 37602 (2,655)
080 190 - Mid-Tex Gas Division Retirement 080.78300 38000 (3,517)
080 190 - Mid-Tex Gas Division Retirement 080.78301 37602 (5,075)
080 190 - Mid-Tex Gas Division Retirement 080.78301 38000 (12,005)
080 190 - Mid-Tex Gas Division Retirement 080.78344 37601 (194)
080 190 - Mid-Tex Gas Division Retirement 080.78350 37601 (7,408)
080 190 - Mid-Tex Gas Division Retirement 080.78350 37602 (2,546)
080 190 - Mid-Tex Gas Division Retirement 080.78350 38000 (577)
080 190 - Mid-Tex Gas Division Retirement 080.78364 37602 (2,207)
080 190 - Mid-Tex Gas Division Retirement 080.78367 37602 (11,866)
080 190 - Mid-Tex Gas Division Retirement 080.78374 37601 (505)
080 190 - Mid-Tex Gas Division Retirement 080.78374 37602 (516)
080 190 - Mid-Tex Gas Division Retirement 080.78374 38000 (63)
080 190 - Mid-Tex Gas Division Retirement 080.78378 37601 (94)
080 190 - Mid-Tex Gas Division Retirement 080.78379 37602 (8,366)
080 190 - Mid-Tex Gas Division Retirement 080.78384 37602 (479)
080 190 - Mid-Tex Gas Division Retirement 080.78384 37800 (2,132)
080 190 - Mid-Tex Gas Division Retirement 080.78386 37602 (23,754)
080 190 - Mid-Tex Gas Division Retirement 080.78389 37601 (6,035)
080 190 - Mid-Tex Gas Division Retirement 080.78389 37602 (2,329)
080 190 - Mid-Tex Gas Division Retirement 080.78389 38000 (2,894)
080 190 - Mid-Tex Gas Division Retirement 080.78399 37602 (2,570)
080 190 - Mid-Tex Gas Division Retirement 080.78399 38000 (102)
080 190 - Mid-Tex Gas Division Retirement 080.78415 37602 (3,943)
080 190 - Mid-Tex Gas Division Retirement 080.78416 37601 (779)
080 190 - Mid-Tex Gas Division Retirement 080.78416 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.78422 37602 (1,138)
080 190 - Mid-Tex Gas Division Retirement 080.78429 37601 (1,418)
080 190 - Mid-Tex Gas Division Retirement 080.78429 37602 (108)
080 190 - Mid-Tex Gas Division Retirement 080.78456 37602 (20,583)
080 190 - Mid-Tex Gas Division Retirement 080.78472 37601 (571,446)
080 190 - Mid-Tex Gas Division Retirement 080.78490 37602 (21)
080 190 - Mid-Tex Gas Division Retirement 080.78506 37602 (1,949)
MTX Retirements by FERC
Page 28 of 30
574
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.78506 38000 (4,027)
080 190 - Mid-Tex Gas Division Retirement 080.78508 37601 (1,017)
080 190 - Mid-Tex Gas Division Retirement 080.78508 37602 (532)
080 190 - Mid-Tex Gas Division Retirement 080.78508 38000 (153)
080 190 - Mid-Tex Gas Division Retirement 080.78526 37601 (667)
080 190 - Mid-Tex Gas Division Retirement 080.78526 37602 (1,632)
080 190 - Mid-Tex Gas Division Retirement 080.78526 38000 (550)
080 190 - Mid-Tex Gas Division Retirement 080.78528 37601 (4,502)
080 190 - Mid-Tex Gas Division Retirement 080.78528 37602 (686)
080 190 - Mid-Tex Gas Division Retirement 080.78530 37601 (19,584)
080 190 - Mid-Tex Gas Division Retirement 080.78570 37601 (7,908)
080 190 - Mid-Tex Gas Division Retirement 080.78570 37602 (112)
080 190 - Mid-Tex Gas Division Retirement 080.78570 38000 (10,145)
080 190 - Mid-Tex Gas Division Retirement 080.78581 37602 (5,709)
080 190 - Mid-Tex Gas Division Retirement 080.78581 38000 (1,162)
080 190 - Mid-Tex Gas Division Retirement 080.78586 38000 (107)
080 190 - Mid-Tex Gas Division Retirement 080.78589 37601 (7,405)
080 190 - Mid-Tex Gas Division Retirement 080.78589 38000 (7,073)
080 190 - Mid-Tex Gas Division Retirement 080.78595 38000 (14)
080 190 - Mid-Tex Gas Division Retirement 080.78613 37601 (15,146)
080 190 - Mid-Tex Gas Division Retirement 080.78613 37602 (3,732)
080 190 - Mid-Tex Gas Division Retirement 080.78613 38000 (36)
080 190 - Mid-Tex Gas Division Retirement 080.78621 37601 (745)
080 190 - Mid-Tex Gas Division Retirement 080.78621 38000 (1,294)
080 190 - Mid-Tex Gas Division Retirement 080.78622 37601 (13,539)
080 190 - Mid-Tex Gas Division Retirement 080.78622 38000 (5,134)
080 190 - Mid-Tex Gas Division Retirement 080.78649 37601 (4,732)
080 190 - Mid-Tex Gas Division Retirement 080.78649 37602 (3,060)
080 190 - Mid-Tex Gas Division Retirement 080.78649 38000 (102)
080 190 - Mid-Tex Gas Division Retirement 080.78659 37601 (170,728)
080 190 - Mid-Tex Gas Division Retirement 080.78659 37602 (131)
080 190 - Mid-Tex Gas Division Retirement 080.78677 37601 (26,201)
080 190 - Mid-Tex Gas Division Retirement 080.78677 38000 (88)
080 190 - Mid-Tex Gas Division Retirement 080.78697 37601 (579)
080 190 - Mid-Tex Gas Division Retirement 080.78705 37601 (4,261)
080 190 - Mid-Tex Gas Division Retirement 080.78713 37601 (22,237)
080 190 - Mid-Tex Gas Division Retirement 080.78713 37602 (1,548)
080 190 - Mid-Tex Gas Division Retirement 080.78713 38000 (1,158)
080 190 - Mid-Tex Gas Division Retirement 080.78733 37602 (211)
080 190 - Mid-Tex Gas Division Retirement 080.78739 37602 (217)
080 190 - Mid-Tex Gas Division Retirement 080.78741 37800 (139,554)
080 190 - Mid-Tex Gas Division Retirement 080.78757 37601 (1,622)
080 190 - Mid-Tex Gas Division Retirement 080.78781 37800 (7,395)
080 190 - Mid-Tex Gas Division Retirement 080.78805 37602 (727)
080 190 - Mid-Tex Gas Division Retirement 080.78806 37601 (71)
080 190 - Mid-Tex Gas Division Retirement 080.78810 37602 (12)
080 190 - Mid-Tex Gas Division Retirement 080.78823 37602 (850)
080 190 - Mid-Tex Gas Division Retirement 080.78831 37601 (5,001)
080 190 - Mid-Tex Gas Division Retirement 080.78831 37602 (553)
080 190 - Mid-Tex Gas Division Retirement 080.78831 38000 (1,445)
080 190 - Mid-Tex Gas Division Retirement 080.78832 37601 (297)
080 190 - Mid-Tex Gas Division Retirement 080.78867 37601 (365)
080 190 - Mid-Tex Gas Division Retirement 080.78867 37602 (112)
080 190 - Mid-Tex Gas Division Retirement 080.78868 39000 (10,484)
080 190 - Mid-Tex Gas Division Retirement 080.78877 37601 (2,586)
080 190 - Mid-Tex Gas Division Retirement 080.78877 37602 (244)
080 190 - Mid-Tex Gas Division Retirement 080.78877 38000 (27,483)
080 190 - Mid-Tex Gas Division Retirement 080.78884 37602 (1,061)
080 190 - Mid-Tex Gas Division Retirement 080.78884 38000 (89)
080 190 - Mid-Tex Gas Division Retirement 080.78892 37601 (1,422)
080 190 - Mid-Tex Gas Division Retirement 080.78892 38000 (193)
080 190 - Mid-Tex Gas Division Retirement 080.78895 37600 (1,627)
080 190 - Mid-Tex Gas Division Retirement 080.78896 37800 (27,240)
080 190 - Mid-Tex Gas Division Retirement 080.78898 37601 (39)
080 190 - Mid-Tex Gas Division Retirement 080.78898 37602 (8)
080 190 - Mid-Tex Gas Division Retirement 080.78898 37800 (435)
080 190 - Mid-Tex Gas Division Retirement 080.78898 38000 (222)
080 190 - Mid-Tex Gas Division Retirement 080.78945 37602 (3,023)
080 190 - Mid-Tex Gas Division Retirement 080.78945 38000 (11,740)
080 190 - Mid-Tex Gas Division Retirement 080.78957 37601 (528)
080 190 - Mid-Tex Gas Division Retirement 080.78957 37602 (3,891)
080 190 - Mid-Tex Gas Division Retirement 080.78957 38000 (1,983)
080 190 - Mid-Tex Gas Division Retirement 080.78971 37601 (2,501)
080 190 - Mid-Tex Gas Division Retirement 080.78971 37602 (1,833)
080 190 - Mid-Tex Gas Division Retirement 080.78971 38000 (902)
080 190 - Mid-Tex Gas Division Retirement 080.78979 37601 (1,103)
080 190 - Mid-Tex Gas Division Retirement 080.78979 37602 (305)
080 190 - Mid-Tex Gas Division Retirement 080.78979 38000 (13,199)
080 190 - Mid-Tex Gas Division Retirement 080.78981 37601 (2,767)
080 190 - Mid-Tex Gas Division Retirement 080.78983 37601 (417)
080 190 - Mid-Tex Gas Division Retirement 080.78983 37602 (81)
080 190 - Mid-Tex Gas Division Retirement 080.78983 38000 (296)
080 190 - Mid-Tex Gas Division Retirement 080.78992 37601 (1,273)
080 190 - Mid-Tex Gas Division Retirement 080.78992 37602 (32)
080 190 - Mid-Tex Gas Division Retirement 080.78992 38000 (4,100)
080 190 - Mid-Tex Gas Division Retirement 080.79001 37601 (588)
080 190 - Mid-Tex Gas Division Retirement 080.79001 37602 (56)
080 190 - Mid-Tex Gas Division Retirement 080.79001 38000 (136)
080 190 - Mid-Tex Gas Division Retirement 080.79012 37602 (16,930)
080 190 - Mid-Tex Gas Division Retirement 080.79040 37602 (5,174)
080 190 - Mid-Tex Gas Division Retirement 080.79040 38000 (27,455)
080 190 - Mid-Tex Gas Division Retirement 080.79064 38000 (3,804)
080 190 - Mid-Tex Gas Division Retirement 080.79117 37602 (6,361)
080 190 - Mid-Tex Gas Division Retirement 080.79126 37601 (5,211)
080 190 - Mid-Tex Gas Division Retirement 080.79126 37602 (7,945)
080 190 - Mid-Tex Gas Division Retirement 080.79126 38000 (4,942)
080 190 - Mid-Tex Gas Division Retirement 080.79137 37601 (125)
080 190 - Mid-Tex Gas Division Retirement 080.79137 37800 (683)
080 190 - Mid-Tex Gas Division Retirement 080.79150 37601 (479)
080 190 - Mid-Tex Gas Division Retirement 080.79150 37602 (405)
080 190 - Mid-Tex Gas Division Retirement 080.79150 38000 (476)
080 190 - Mid-Tex Gas Division Retirement 080.79156 37601 (16)
080 190 - Mid-Tex Gas Division Retirement 080.79159 37601 (107)
080 190 - Mid-Tex Gas Division Retirement 080.79159 37602 (34)
080 190 - Mid-Tex Gas Division Retirement 080.79159 37800 (590)
080 190 - Mid-Tex Gas Division Retirement 080.79209 37601 (1,542)
080 190 - Mid-Tex Gas Division Retirement 080.79226 37601 (825)
MTX Retirements by FERC
Page 29 of 30
575
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corp., Mid-Tex Division
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
080 190 - Mid-Tex Gas Division Retirement 080.79226 38000 (416)
080 190 - Mid-Tex Gas Division Retirement 080.79228 37601 (584)
080 190 - Mid-Tex Gas Division Retirement 080.79228 38000 (241)
080 190 - Mid-Tex Gas Division Retirement 080.79253 37800 (420)
080 190 - Mid-Tex Gas Division Retirement 080.79288 37602 (326)
080 190 - Mid-Tex Gas Division Retirement 080.79354 37602 (20,332)
080 190 - Mid-Tex Gas Division Retirement 080.79371 37601 (208)
080 190 - Mid-Tex Gas Division Retirement 080.79374 37601 (1,502)
080 190 - Mid-Tex Gas Division Retirement 080.79374 38000 (3,805)
080 190 - Mid-Tex Gas Division Retirement 080.79388 37602 (1,169)
080 190 - Mid-Tex Gas Division Retirement 080.79411 37601 (4,898)
080 190 - Mid-Tex Gas Division Retirement 080.79411 37602 (10,219)
080 190 - Mid-Tex Gas Division Retirement 080.79411 37800 (372)
080 190 - Mid-Tex Gas Division Retirement 080.79411 38000 (429)
080 190 - Mid-Tex Gas Division Retirement 080.79440 37601 (1,706)
080 190 - Mid-Tex Gas Division Retirement 080.79485 37800 (381)
080 190 - Mid-Tex Gas Division Retirement 080.79529 37602 (1,923)
080 190 - Mid-Tex Gas Division Retirement 080.79529 37800 (983)
080 190 - Mid-Tex Gas Division Retirement 080.79546 37602 (3,603)
080 190 - Mid-Tex Gas Division Retirement 080.79546 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.79557 37601 (361)
080 190 - Mid-Tex Gas Division Retirement 080.79557 37602 (14)
080 190 - Mid-Tex Gas Division Retirement 080.79557 38000 (315)
080 190 - Mid-Tex Gas Division Retirement 080.79565 37601 (1,614)
080 190 - Mid-Tex Gas Division Retirement 080.79565 38000 (577)
080 190 - Mid-Tex Gas Division Retirement 080.79575 37601 (78,946)
080 190 - Mid-Tex Gas Division Retirement 080.79575 38000 (2)
080 190 - Mid-Tex Gas Division Retirement 080.79617 37601 (137)
080 190 - Mid-Tex Gas Division Retirement 080.79617 37602 (98)
080 190 - Mid-Tex Gas Division Retirement 080.79617 37800 (598)
080 190 - Mid-Tex Gas Division Retirement 080.79640 37602 (151)
080 190 - Mid-Tex Gas Division Retirement 080.79655 37601 (191)
080 190 - Mid-Tex Gas Division Retirement 080.79704 37800 (715)
080 190 - Mid-Tex Gas Division Retirement 080.79706 37601 (5,419)
080 190 - Mid-Tex Gas Division Retirement 080.79706 38000 (572)
080 190 - Mid-Tex Gas Division Retirement 080.79727 37601 (30)
080 190 - Mid-Tex Gas Division Retirement 080.79731 37601 (2,624)
080 190 - Mid-Tex Gas Division Retirement 080.79744 37601 (2,252)
080 190 - Mid-Tex Gas Division Retirement 080.79744 37602 (998)
080 190 - Mid-Tex Gas Division Retirement 080.79744 38000 (359)
080 190 - Mid-Tex Gas Division Retirement 080.79781 37601 (1,574)
080 190 - Mid-Tex Gas Division Retirement 080.79781 38000 (163)
080 190 - Mid-Tex Gas Division Retirement 080.79846 37602 (496)
080 190 - Mid-Tex Gas Division Retirement 080.79846 37800 (23,407)
080 190 - Mid-Tex Gas Division Retirement 080.79879 39000 (11,173)
080 190 - Mid-Tex Gas Division Retirement 080.79901 37602 (10)
080 190 - Mid-Tex Gas Division Retirement 080.79901 38000 (390)
080 190 - Mid-Tex Gas Division Retirement 080.79930 38900 (131,785)
080 190 - Mid-Tex Gas Division Retirement 080.79930 39000 (3,087,546)
080 190 - Mid-Tex Gas Division Retirement 080.79930 39004 (63,681)
080 190 - Mid-Tex Gas Division Retirement 080.79938 37601 (26,264)
080 190 - Mid-Tex Gas Division Retirement 080.80084 37602 (161)
080 190 - Mid-Tex Gas Division Retirement 080.80147 37601 (1,473)
080 190 - Mid-Tex Gas Division Retirement 080.80169 37602 (7)
080 190 - Mid-Tex Gas Division Retirement 080.80169 38000 (1)
080 190 - Mid-Tex Gas Division Retirement 080.80448 39000 (5,516)
080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39100 (1,088,937)
080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39200 (69,548)
080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39400 (2,428,904)
080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39500 (295,595)
080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39900 (29,914)
080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39901 (63,528)
080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39902 (7,694)
080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39903 (136,168)
080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39906 (2,604,010)
080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39907 (9,216)
080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39908 (203,719)
080 190 - Mid-Tex Gas Division Retirement 080.71284 37602 588
080 190 - Mid-Tex Gas Division Retirement 080.71284 38000 (588)
080 190 - Mid-Tex Gas Division Retirement 080.71639 37602 (1,500)
080 190 - Mid-Tex Gas Division Retirement 080.71639 38000 1,500
080 190 - Mid-Tex Gas Division Retirement 080.71746 37602 (2,500)
080 190 - Mid-Tex Gas Division Retirement 080.71746 38000 2,500
080 190 - Mid-Tex Gas Division Retirement 080.72248 37602 13,665
080 190 - Mid-Tex Gas Division Retirement 080.72248 38000 (13,665)
080 190 - Mid-Tex Gas Division Retirement 080.72252 37602 (1,250)
080 190 - Mid-Tex Gas Division Retirement 080.72252 38000 1,250
080 190 - Mid-Tex Gas Division Retirement 080.74165 37602 (2,000)
080 190 - Mid-Tex Gas Division Retirement 080.74165 38000 2,000
080 190 - Mid-Tex Gas Division Retirement ADMIN 080 39000 370,659
080 190 - Mid-Tex Gas Division Retirement OTHER 37601 (4,320)
080 190 - Mid-Tex Gas Division Retirement OTHER 37602 (746)
080 190 - Mid-Tex Gas Division Retirement OTHER 38000 (17,836)
080 190 - Mid-Tex Gas Division Retirement OTHER 39200 (226,734)
Total Mid-Tex Division Retirements (86,216,397)
MTX Retirements by FERC
Page 30 of 30
576
Item 10.
ATMOS ENERGY CORP.,
MID-TEX DIVISION
INTERIM RATE ADJUSTMENT
APPLICATION
PROJECT REPORT 2022
SHARED SERVICES
ADDITIONS
577
Item 10.
ATMOS ENERGY CORPORATION, SHARED SERVICES
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO.PROJECT NO. COST (1)
ALLOCATION
TO MTX
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO
PUBLIC USE IN CALENDAR YEAR 2022 (2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
SSU ADDITIONS - GENERAL OFFICE PER BOOK @ 40.09%
1 010.37694 31,823 12,758
URBINT APPLICATION UPGRADE FOR OPTIMAIN THAT IS
REQUIRED FOR THE DIM TEAM.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY MARCH
2 010.38345 711,302 285,161 SHARED SERVICES PC REPLACEMENTS FOR FY 2021.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY AUGUST
3 010.38402 (2,479) (994)
GIS SYSTEM IMPROVEMENTS FOR GE SMALLWORLD, GE GSA,
APT ESRI, OPTIMAIN, DISTRIBUTION ESRI, INTERFACES AND
REPORTING.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY MARCH
4 010.39085 452 181 INFOBLOX UPGRADE.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY MARCH
5 010.39107 38,612 15,480
IMPLEMENTATION OF NEW AUTOMATION TOOLS FOR
ACCOUNTS PAYABLE.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY DECEMBER
6 010.39315 8,909 3,572
SAP S4 NON-PRODUCTION STORAGE AND NETWORK
HARDWARE.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY MARCH
7 010.39325 1,407,319 564,194 UPLIFT OF ATMOSENERGY.COM TO A NEW WEB PLATFORM.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY DECEMBER
8 010.39439 (87) (35)
VEHICLE GEOLOCATION PROJECT - INTERFACE TO GATHER
GEOLOCATION INFORMATION FROM ARI/GEOTAB AND
POPULATE CLICK WITH TECHNICIAN INFORMATION.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY MARCH
9 010.39507 133,986 53,715
INSTALL AND CONFIGURE VDI CLUSTER IN THE GAS CONTROL
NETWORK TO SUPPORT THE REMOTE WORK AND DR
INITIATIVES.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY JUNE
10 010.39515 176,913 70,925 CARBON BLACK PERPETUAL LICENSE EXPANSION.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY SEPTEMBER
11 010.39605 (88) (35)
UPGRADE THE CURRENT CADENCY SYSTEM AND CREATE NEW
INTEGRATIONS TO BACK OFFICE SYSTEMS.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY MARCH
12 010.39653 1,829 733
SETUP AND INSTALLATION OF NINE TEAMS ROOMS AROUND
LINCOLN CENTRE.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES EQUIPMENT MARCH
13 010.39673 28,225 11,315
DMVPN ROUTER FOR LINCOLN CENTRE - INTEGRATED
SERVICES ROUTER.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY SEPTEMBER
14 010.39769 6,335 2,540
CONTROL ROOM SYSTEM ENHANCEMENTS TO BETTER
OPERATIONALIZE DUAL SIM CARD MODEMS ON TIER 1
STATIONS.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY SEPTEMBER
15 010.39774 (8,228) (3,298)
IMPLEMENT SOLUTION TO SUPPORT A HOT STANDBY
(REDUNDANT) AND DR FOR ATLAS. OPERATIONS RTO OF TWO
HOURS WITH NO DATA LOSS.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY JUNE
16 010.39905 91,012 36,487
WI-FI ENHANCEMENTS - CISCO DIGITAL NETWORK
ARCHITECTURE CENTER (DNA), WIRELESS LAN CONTROLLER
(WLC), AND IDENTITY SERVICES ENGINE (ISE) UPGRADE AND
CONFIGURATION.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY SEPTEMBER
17 010.39966 2,435 976
DISTRIBUTION INTEGRITY MANAGEMENT - INCORPORATE NEW
FUNCTIONALITY FOR INTERACTIVE THREAT ANALYSIS INTO THE
ATMOS DNV DRAM SYNERGY RISK MODEL.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY MARCH
18 010.40011 35,155 14,094 WINBILL INFRASTRUCTURE AND LICENSE INCREASE.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY SEPTEMBER
19 010.40026 16,080 6,446
CRM REPORTING PROJECT TO ENHANCE OMS TO SUPPORT
DOT 192.631 PHMSA RELATED COMPLIANCE REQUIREMENTS
AND AUTOMATED REPORTING TO IMPROVE EFFICIENCY AND
ACCURACY.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY DECEMBER
20 010.40190 24,798 9,942 USER DEVICE TRACKER UPGRADE.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY SEPTEMBER
21 010.40226 23,482 9,414 QUORUM PGAS INTERFACE ENHANCEMENTS DEVELOPMENT.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY MARCH
22 010.40282 174,095 69,795
WINDOWS AUTOMATION ANSIBLE ACCELERATOR - DEVELOP
CODE AND CONFIGURATION WITH ANSIBLE TOOLS TO
AUTOMATE WINDOWS SERVER MANAGEMENT.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY SEPTEMBER
23 010.40337 26,449 10,604
CARBON BLACK LICENSE IMPROVEMENTS - PERPETUAL
LICENSES FOR RESPONSE ON-PREMISE FOR WINDOWS AND
LINUX.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY JUNE
24 010.40456 3,142,460 1,259,812
UPGRADE TIER 1 STORAGE AT LINCOLN CENTRE - ACQUIRE
NEW POWERMAX DISK ARRAY.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY DECEMBER
25 010.40457 2,766,355 1,109,032 UPGRADE BACKUP STORAGE LINCOLN CENTRE.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY DECEMBER
26 010.40458 1,720,265 689,654 REPLACE VMAX STORAGE.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY DECEMBER
27 010.40466 123,054 49,332
GIS ENHANCEMENT PROJECT FOR APPLICATION UPDATES /
IMPROVEMENTS OF SMALLWORLD, TRANSMISSION GIS AND
SYNCH, GAS AND OTHER TOOLS.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY DECEMBER
28 010.40504 249,557 100,047 LICENSE GROWTH FOR LASERFICHE.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY MAY
29 010.40578 3,720 1,491 ONE LAPTOP COMPUTER
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY MARCH
30 010.40631 865,468 346,966 SENSUS/XYLEM RNI UPGRADE TO V4.10.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY DECEMBER
31 010.40682 1,880 754
HR VACCINE MANAGEMENT WORKDAY EXTEND APPLICATION
CREATION.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY MARCH
32 010.40683 105,747 42,394
UPGRADE OF THE LASERFICHE INFRASTRUTURE AND
APPLICATION.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY SEPTEMBER
33 010.40687 23,778 9,533
REPLACE 8 HEAVY DUTY 24/7 ROOM CHAIRS IN GAS CONTROL
ROOM AND BACKUP GAS CONTROL ROOM.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES EQUIPMENT JUNE
34 010.40688 8,905 3,570
REPLACE SEVEN HEAVY DUTY 24/7 CHAIRS IN GAS CONTROL
ROOM AND BACKUP GAS CONTROL ROOM.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES EQUIPMENT JUNE
35 010.40690 9,113 3,653
REPLACE THREE HEAVY DUTY 24/7 CHAIRS IN GAS CONTROL
ROOM.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES EQUIPMENT JUNE
36 010.40775 922,356 369,772
ENHANCE ATLAS APPLICATION TO SUPPORT SUSTAINABILITY
FOR PRESSURE MONITORING GUIDEANCE (PMG) WITH NEW
FUNCTIONS/FEATURES.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY DECEMBER
37 010.40871 166,391 66,706
AUTOMATED MOBILE LEAK DETECTION IMPROVEMENTS /
ENHANCEMENTS FOR 2022.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY DECEMBER
38 010.40934 3,834 1,537 PURCHASE ADDITIONAL KOFAX MARKVIEW LICENSES.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY SEPTEMBER
39 010.40947 2,640 1,058 ONE LAPTOP COMPUTER
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY MARCH
40 010.40998 10,837 4,345 OT TUNNELING.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY SEPTEMBER
41 010.41014 104,886 42,049
IMPLEMENT THE DRAGOS PLATFORM HARDWARE AND
SOFTWARE TO IMPROVE CYBERSECURITY MEASURES FOR
DISTRIBUTION OT.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY JUNE
42 010.41082 4,131 1,656 CHECK PRINTER FOR ACCOUNTS PAYABLE.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES EQUIPMENT MARCH
43 010.41148 96,406 38,649
OT NETWORK SEPARATION - OPERATION TECHNOLOGY
SEPARATION.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY DECEMBER
44 010.41227 4,484 1,798 WIRELESS AP'S FOR GAS SUPPLY.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY SEPTEMBER
45 010.41689 9,966 3,995 REPLACE END OF LIFE BATTERIES ON THE DATA CENTER UPS.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY JULY
46 010.41698 8,776 3,518
WORKSTATIONS FOR SECONDARY GAS CONTROL ROOM THAT
ARE ON THE SECURE NETWORK.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY DECEMBER
SSU Additions
Page 1 of 3
578
Item 10.
ATMOS ENERGY CORPORATION, SHARED SERVICES
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO.PROJECT NO. COST (1)
ALLOCATION
TO MTX
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO
PUBLIC USE IN CALENDAR YEAR 2022 (2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
47 010.41754 3,004 1,204 ONE LAPTOP COMPUTER.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY SEPTEMBER
48 010.41758 22,517 9,027
INSTALL THREE SECURITY CARD READERS IN BACKUP GAS
CONTROL ROOM.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES STRUCTURES SEPTEMBER
49 010.41855 44,184 17,713
CAPTURIS NEW SERVICE SETUP - DEVELOPMENT OF ON
PREMISE APPLICATION TO REQUEST NEW TURN ON/OFF
SERVICE.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY DECEMBER
50 010.42113 11,590 4,646
SAFETY ENHANCEMENT TO GAS CONTROL DISPLAYS TO
SUPPORT REMOTE CONTROL OF ISOLATION VALVES ON THE
DISTRIBUTION SYSTEMS.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY DECEMBER
51 010.42154 21,568 8,647
UPGRADE SPECTRUM GEOCODING SYSTEM TO THE LATEST
SOFTWARE VERSION WITH UPGRADED HARDWARE
PROCESSING CAPABILITY.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY DECEMBER
52 010.42273 83,736 33,570
LC 2, 16TH FLOOR - PURCHASE AND INSTALL NINE NEW
WORKSTATIONS.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES STRUCTURES DECEMBER
53
TOTAL SSU
GENERAL OFFICE
ADDITIONS
ALLOCATED
@ 40.09%
(LN. 1 - LN. 52)13,469,939 5,400,098
54
55
56 SSU ADDITIONS - GREENVILLE AVENUE PER BOOK @ 14.18%
57 010.38765 (604,566) (85,720) GVA FUEL CELL.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES STRUCTURES SEPTEMBER
58 010.40051 300,029 42,541 UPS-A BATTERY SUBSYSTEM IN GVA.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY AUGUST
59 010.40688 11,873 1,683
REPLACE SEVEN HEAVY DUTY 24/7 CHAIRS IN GAS CONTROL
ROOM AND BACKUP GAS CONTROL ROOM.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES EQUIPMENT JUNE
60
TOTAL SSU
GREENVILLE
AVENUE
ADDITIONS
ALLOCATED
@ 14.18%
(LN. 57 - LN. 59)(292,663) (41,496)
61
62
63 SSU ADDITIONS - ALIGNE PIPE PER BOOK @ 6.13%
64 010.35984 16,125 989
ALIGNE APPLICATION IMPROVEMENTS FROM A LIST OF
ENHANCEMENTS COLLECTED FROM THE ENTERPRISE
ROLLOUT.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY MARCH
65 010.40476 4,812 295 ALIGNE SOFTWARE ENHANCEMENTS AND SERVICES.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY OCTOBER
66
TOTAL SSU
ALIGNE PIPE
ADDITIONS
ALLOCATED
@ 6.13%
(LN. 64 - LN. 65)20,937 1,284
67
68
69 SSU ADDITIONS - CUSTOMER SUPPORT PER BOOK @ 53.00%
70 010.36666 1,030 546
NETWORK ACCESS SWITCHES IN THE VAUGHAN CENTER AND
THE CONTACT CENTERS.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY MARCH
71 010.38587 66,715 35,359 CONTACT CENTER PC REPLACEMENTS FOR FY21.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY SEPTEMBER
72 010.39300 6,165,667 3,267,804 S4 HANA IMPLEMENTATION.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY SEPTEMBER
73 010.40445 14,075 7,460 REPLACE 4 INCH POLY AIRLINE WITH 2 INCH COATED STEEL.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES EQUIPMENT JUNE
74 010.40572 135,493 71,811 WACO CUSTOMER CONTACT CENTER RESTROOMS UPGRADES.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES STRUCTURES AUGUST
75 010.42446 55,381 29,352
PURCHASE AND INSTALL NEW SOUND MASKING SYSTEM FOR
WACO CONTACT CENTER.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES STRUCTURES DECEMBER
76
TOTAL SSU
CUSTOMER
SUPPORT
ADDITIONS
ALLOCATED
@ 53.00%
(LN. 70 - LN. 75)6,438,361 3,412,332
77
78
79 SSU ADDITIONS - CHARLES K. VAUGHAN PER BOOK @ 71.83%
80 010.40518 49,022 35,210 14 COMPUTERS FOR TECHNICAL TRAINING INSTRUCTORS.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES EQUIPMENT FEBRUARY
81 010.40519 7,003 5,030 2 COMPUTERS FOR TECHNICAL TRAINING INSTRUCTORS.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES EQUIPMENT FEBRUARY
82 010.40521 43,690 31,380 4 GAS TRAC LZ-30 KITS FOR TECHNICAL TRAINING.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES EQUIPMENT FEBRUARY
83 010.41283 8,273 5,942 CKV ICE MACHINE REPLACEMENT.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES EQUIPMENT JUNE
84 010.41464 76,569 54,996
CKV - MODIFICATIONS TO THE PIGGING LOOP AT CKV. THESE
MODIFICATIONS ARE NEEDED IN ORDER TO FACILITATE
TRAINING FOR ATMOS EMPLOYEES ON THE NEW PIGGING
PROCESS.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES EQUIPMENT DECEMBER
85 010.41468 5,679 4,079 CKV - INSTRUCTOR CAMERA KIT.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES EQUIPMENT JUNE
86 010.41658 16,839 12,095
12 LAPTOP COMPUTERS FOR TECHNICAL TRAINING STUDENTS
ATTENDING CLASS IN-PERSON.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES EQUIPMENT SEPTEMBER
87 010.41723 1,900 1,365
CKV - FLEXIBLE ARM, BASE AND MICROSCOPE KIT FOR
TECHNICAL TRAINING.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES EQUIPMENT JULY
88 010.41861 4,369 3,138
CKV INSTRUCTOR CAMCORDERS FOR VIRTUAL CLASSES, LIVE
DEMONSTRATIONS AND WHEN CAMERA NEEDS TO MOVE
AROUND DURING CLASSES.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES EQUIPMENT OCTOBER
89 010.41929 7,780 5,588
THREE LAPTOP COMPUTERS TO REPLACE ONES NO LONGER
UNDER SUPPORT.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES EQUIPMENT SEPTEMBER
SSU Additions
Page 2 of 3
579
Item 10.
ATMOS ENERGY CORPORATION, SHARED SERVICES
PROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2022
LINE NO.PROJECT NO. COST (1)
ALLOCATION
TO MTX
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO
PUBLIC USE IN CALENDAR YEAR 2022 (2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED IN
GAS PLANT IN
SERVICE
90
TOTAL SSU
CHARLES K.
VAUGHAN
ADDITIONS
ALLOCATED
@ 71.83%
(LN. 80 - LN. 89)221,123 158,822
91
92
TOTAL SHARED
SERVICES
ADDITIONS
(LN. 53 + LN. 60 +
LN. 66 + LN. 76 +
LN. 90)19,857,696 8,931,040
93
94
95 NOTES:
96 (1) The "COST" column reflects the capitalized portion of the cost only.
97 (2) The "DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CALENDAR YEAR 2022" column describes capitalized costs only.
SSU Additions
Page 3 of 3
580
Item 10.
ATMOS ENERGY CORP.,
MID-TEX DIVISION
INTERIM RATE ADJUSTMENT
APPLICATION
PROJECT REPORT 2022
SHARED SERVICES
ADDITIONS
BY FERC ACCOUNT
581
Item 10.
ATMOS ENERGY CORPORATION, SHARED SERVICES
PROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corporation, Shared Services
CY 2022 Project Additions by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
010 002 - Dallas Atmos Rate Division Addition 010.35984 39938 16,125
010 002 - Dallas Atmos Rate Division Addition 010.37694 39908 31,823
010 002 - Dallas Atmos Rate Division Addition 010.38345 39906 711,302
010 002 - Dallas Atmos Rate Division Addition 010.38402 39908 (2,479)
010 002 - Dallas Atmos Rate Division Addition 010.38765 39005 (604,566)
010 002 - Dallas Atmos Rate Division Addition 010.39085 39903 452
010 002 - Dallas Atmos Rate Division Addition 010.39107 39908 38,612
010 002 - Dallas Atmos Rate Division Addition 010.39315 39901 7,764
010 002 - Dallas Atmos Rate Division Addition 010.39315 39903 1,145
010 002 - Dallas Atmos Rate Division Addition 010.39325 39908 1,407,319
010 002 - Dallas Atmos Rate Division Addition 010.39439 39908 (87)
010 002 - Dallas Atmos Rate Division Addition 010.39507 39901 133,986
010 002 - Dallas Atmos Rate Division Addition 010.39515 39908 176,913
010 002 - Dallas Atmos Rate Division Addition 010.39605 39908 (88)
010 002 - Dallas Atmos Rate Division Addition 010.39653 39700 1,829
010 002 - Dallas Atmos Rate Division Addition 010.39673 39903 28,225
010 002 - Dallas Atmos Rate Division Addition 010.39769 39908 6,335
010 002 - Dallas Atmos Rate Division Addition 010.39774 39908 (8,228)
010 002 - Dallas Atmos Rate Division Addition 010.39905 39908 91,012
010 002 - Dallas Atmos Rate Division Addition 010.39966 39908 2,435
010 002 - Dallas Atmos Rate Division Addition 010.40011 39908 35,155
010 002 - Dallas Atmos Rate Division Addition 010.40026 39908 16,080
010 002 - Dallas Atmos Rate Division Addition 010.40051 39005 300,029
010 002 - Dallas Atmos Rate Division Addition 010.40190 39908 24,798
010 002 - Dallas Atmos Rate Division Addition 010.40226 39908 23,482
010 002 - Dallas Atmos Rate Division Addition 010.40282 39908 174,095
010 002 - Dallas Atmos Rate Division Addition 010.40337 39908 26,449
010 002 - Dallas Atmos Rate Division Addition 010.40456 39901 3,142,460
010 002 - Dallas Atmos Rate Division Addition 010.40457 39901 2,766,355
010 002 - Dallas Atmos Rate Division Addition 010.40458 39901 1,720,265
010 002 - Dallas Atmos Rate Division Addition 010.40466 39908 123,054
010 002 - Dallas Atmos Rate Division Addition 010.40476 39938 4,812
010 002 - Dallas Atmos Rate Division Addition 010.40504 39908 249,557
010 002 - Dallas Atmos Rate Division Addition 010.40578 39906 3,720
010 002 - Dallas Atmos Rate Division Addition 010.40631 39908 865,468
010 002 - Dallas Atmos Rate Division Addition 010.40682 39908 1,880
010 002 - Dallas Atmos Rate Division Addition 010.40683 39908 105,747
010 002 - Dallas Atmos Rate Division Addition 010.40687 39100 23,778
010 002 - Dallas Atmos Rate Division Addition 010.40688 39100 8,905
010 002 - Dallas Atmos Rate Division Addition 010.40688 39104 11,873
010 002 - Dallas Atmos Rate Division Addition 010.40690 39100 9,113
010 002 - Dallas Atmos Rate Division Addition 010.40775 39908 922,356
010 002 - Dallas Atmos Rate Division Addition 010.40871 39908 166,391
010 002 - Dallas Atmos Rate Division Addition 010.40934 39908 3,834
010 002 - Dallas Atmos Rate Division Addition 010.40947 39906 2,640
010 002 - Dallas Atmos Rate Division Addition 010.40998 39903 10,837
010 002 - Dallas Atmos Rate Division Addition 010.41014 39902 104,886
010 002 - Dallas Atmos Rate Division Addition 010.41082 39100 4,131
010 002 - Dallas Atmos Rate Division Addition 010.41148 39903 96,406
010 002 - Dallas Atmos Rate Division Addition 010.41227 39903 4,484
010 002 - Dallas Atmos Rate Division Addition 010.41689 39903 9,966
010 002 - Dallas Atmos Rate Division Addition 010.41698 39906 8,776
010 002 - Dallas Atmos Rate Division Addition 010.41754 39906 3,004
010 002 - Dallas Atmos Rate Division Addition 010.41758 39000 22,517
010 002 - Dallas Atmos Rate Division Addition 010.41855 39908 44,184
010 002 - Dallas Atmos Rate Division Addition 010.42113 39908 11,590
010 002 - Dallas Atmos Rate Division Addition 010.42154 39908 21,568
010 002 - Dallas Atmos Rate Division Addition 010.42273 39100 83,736
Total SSU General Office (Div 002)13,198,211
010 012 - Call Center Division Addition 010.36666 39903 1,030
010 012 - Call Center Division Addition 010.38587 39906 66,715
010 012 - Call Center Division Addition 010.39300 39901 2,210,661
010 012 - Call Center Division Addition 010.39300 39908 3,955,006
010 012 - Call Center Division Addition 010.40445 39800 14,075
010 012 - Call Center Division Addition 010.40518 39916 49,022
010 012 - Call Center Division Addition 010.40519 39916 7,003
010 012 - Call Center Division Addition 010.40521 39410 43,690
010 012 - Call Center Division Addition 010.40572 39009 135,493
010 012 - Call Center Division Addition 010.41283 39110 8,273
010 012 - Call Center Division Addition 010.41464 39110 76,569
010 012 - Call Center Division Addition 010.41468 39710 5,679
010 012 - Call Center Division Addition 010.41658 39710 16,839
010 012 - Call Center Division Addition 010.41723 39410 1,900
010 012 - Call Center Division Addition 010.41861 39110 4,369
010 012 - Call Center Division Addition 010.41929 39710 7,780
010 012 - Call Center Division Addition 010.42446 39009 55,381
Total SSU Customer Support (Div 012)6,659,484
Total SSU Additions 19,857,696
SSU Additions by FERC
Page 1 of 1
582
Item 10.
ATMOS ENERGY CORP.,
MID-TEX DIVISION
INTERIM RATE ADJUSTMENT
APPLICATION
PROJECT REPORT 2022
SHARED SERVICES
RETIREMENTS
583
Item 10.
ATMOS ENERGY CORPORATION, SHARED SERVICES
PROJECT REPORT RETIREMENTS FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST (1)
ALLOCATION
TO MTX
DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO
PUBLIC USE IN CALENDAR YEAR 2022 (2)
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
SSU RETIREMENTS - GENERAL OFFICE PER BOOK @ 40.09%
1 010.26877 (1,071,341.24) (429,501)
THIS PROJECT WILL UPGRADE PGAS TO THE LATEST VERSION,
WHICH IS 16.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY
2 010.26877 1,071,341.24 429,501
THIS PROJECT WILL UPGRADE PGAS TO THE LATEST VERSION,
WHICH IS 16.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY
3 010.33907 20,372.06 8,167 ONE DESKTOP COMPUTER AND FOUR LAPTOP COMPUTERS.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY
4 010.33907 (20,372.06) (8,167) ONE DESKTOP COMPUTER AND FOUR LAPTOP COMPUTERS.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY
5
TOTAL SSU
GENERAL OFFICE
RETIREMENTS
ALLOCATED
@ 40.09%
(LN. 1 - LN. 4)- -
6
7
8 SSU RETIREMENTS - CHARLES K. VAUGHAN PER BOOK @ 71.83%
9 ADMIN 010 (47,939) (34,432) ADMIN.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY
10 ADMIN 010 (23,632) (16,974) ADMIN.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY
11 ADMIN 010 (290,207) (208,442) ADMIN.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY
12 ADMIN 010 (140,469) (100,892) ADMIN.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY
13 ADMIN 010 (12,039) (8,647) ADMIN.
ALL ATMOS
CUSTOMERS - MIXED
SHARED
SERVICES
INFORMATION
TECHNOLOGY
14
TOTAL SSU
CHARLES K.
VAUGHAN
RETIREMENTS
ALLOCATED0
@ 71.83%
(LN. 9 - LN. 13)(514,286) (369,387)
15
16
TOTAL SHARED
SERVICES
RETIREMENTS
(LN. 5 + LN. 14)(514,286) (369,387)
SSU Retirements
Page 1 of 1
584
Item 10.
ATMOS ENERGY CORP.,
MID-TEX DIVISION
INTERIM RATE ADJUSTMENT
APPLICATION
PROJECT REPORT 2022
SHARED SERVICES
RETIREMENTS
BY FERC ACCOUNT
585
Item 10.
ATMOS ENERGY CORPORATION, SHARED SERVICES
PROJECT REPORT RETIREMENTS BY FERC ACCOUNT FOR CALENDAR YEAR 2022
Atmos Energy Corporation, Shared Services
CY 2022 Project Retirements by FERC Account
COMPANY BUSINESS SEGMENT FERC ACTIVITY CODE PROJECT NO. UTILITY ACCOUNT COST
010 002 - Dallas Atmos Rate Division Retirement 010.26877 39907 (1,071,341.24)
010 002 - Dallas Atmos Rate Division Retirement 010.26877 39908 1,071,341.24
010 002 - Dallas Atmos Rate Division Retirement 010.33907 39906 20,372.06
010 002 - Dallas Atmos Rate Division Retirement 010.33907 39907 (20,372.06)
Total SSU General Office (Div 002)-
010 012 - Call Center Division Retirement ADMIN 010 39110 (47,938.52)
010 012 - Call Center Division Retirement ADMIN 010 39510 (23,632.07)
010 012 - Call Center Division Retirement ADMIN 010 39710 (290,207.46)
010 012 - Call Center Division Retirement ADMIN 010 39910 (140,468.62)
010 012 - Call Center Division Retirement ADMIN 010 39916 (12,039.16)
Total SSU Customer Support (Div 012)(514,285.83)
Total SSU Retirements (514,285.83)
SSU Retirements by FERC
Page 1 of 1
586
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED
IN GAS PLANT
IN SERVICE
REIMBURSEMENT
RECEIVED?
YES/NO
COMMENTS / ADDITIONAL
INFORMATION RELATED TO THE
AMOUNT IN COLUMN "COST"
MID-TEX RELOCATIONS
1 080.45638 (46,996)
RELOCATE FACILITIES. INSTALL 41 FEET OF 6 INCH, 37 FEET OF 8 INCH, 30 FEET
OF 10 INCH AND 4409 FEET OF 16 INCH STEEL AND ABANDON 237 FEET OF 6 INCH,
787 FEET OF 8 INCH, 30 FEET OF 10 INCH, 170 FEET OF 12 INCH AND 3396 FEET OF
16 INCH STEEL ALONG EAST AVENUE H TO ACCOMMODATE TXDOT STREET
PROJECT.ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES MAY YES
$3,120,556.95 CREDITED IN 2022 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
2 080.46146 5
RELOCATE FACILITIES. INSTALL 125 FEET OF 6 INCH, 250 FEET OF 4 INCH, 2920
FEET OF 2 INCH POLY ALONG YEWPON AND ABANDON 90 FEET OF 6 INCH, 215 FEET
OF 4 INCH, 2700 FEET OF 2 INCH STEEL AND 120 FEET OF 2 INCH POLY TO
ACCOMMODATE THE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
3 080.47046 11,979
RELOCATE FACILITIES. INSTALL 248 FEET OF 2 INCH POLY AND 351 FEET OF 4 INCH
POLY AND 5045 FEET OF 6 INCH POLY AND ABANDON 294 FEET OF 2 INCH POLY
AND 3474 FEET OF 4 INCH STEEL AND 1847 FEET OF 4 INCH POLY ALONG WHITE
CHAPEL BOULEVARD TO ACCOMMODATE CITY OF SOUTHLAKE STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS SOUTHLAKE SYSTEM INTEGRITY OCTOBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
4 080.47311 97
RELOCATE FACILITIES. INSTALL 3630 FEET OF 2 INCH POLY ALONG ROYALTON AND
ABANDON 3625 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DALLAS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
5 080.47445 6
RELOCATE FACILITIES. INSTALL 220 FEET OF 4 INCH AND 1930 FEET OF 2 INCH
POLY ALONG NECHES AND ABANDON 645 FEET OF 4 INCH POLY AND 1350 FEET OF
4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS IMPROVEMENT PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
6 080.47605 43
INSTALL 1150 FEET OF 2 INCH POLY ALONG HENDERSON AVENUE AND ABANDON
1150 FEET OF CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
7 080.47607 293
ABANDON 3200 FEET OF 6 AND 8 INCH CAST IRON ALONG HENDERSON AVENUE IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
8 080.48519 1
RELOCATE FACILITIES. INSTALL 3080 FEET OF 4 INCH AND 150 FEET OF 2 INCH
POLY ALONG MERIDA AND ABANDON 2915 FEET OF 4 INCH CAST IRON TO
ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
9 080.48800 83
RELOCATE FACILITIES. INSTALL 4,160 FEET OF 8 INCH, 165 FEET OF 4 INCH, AND
1320 FEET OF 3 INCH POLY ALONG ABRAM STREET AND ABANDON 1,400 FEET OF 8
INCH, 1,760 FEET OF 4 INCH, 620 FEET OF 2 INCH STEEL, AND 1,830 FEET OF 2 INCH
AND 50 FEET OF 4 INCH POLY TOACCOMMODATE CITY OF ARLINGTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
10 080.48844 1
INSTALL 2375 FEET OF 2 INCH POLY ALONG COCHRAN AND ABANDON 2375 FEET
OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO PROJECT IS NOT REIMBURSABLE
11 080.49082 1
RELOCATE FACILITIES. INSTALL 30 FEET OF 6 INCH POLY, 30 FEET OF 6 INCH
STEEL, 275 FEET OF 4 INCH POLY, AND 250 FEET OF 2 INCH POLY ALONG SPRING
VALLEY AND ABANDON 25 FEET OF 6 INCH, 1175 FEET OF 6 INCH AND 1130 FEET OF
4 INCH POLY TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS RICHARDSON SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
12 080.49174 1
RELOCATE FACILITIES. INSTALL 755 FEET OF 4 INCH POLY ALONG ROSEDALE
STREET AND ABANDON 638 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
13 080.49441 1
RELOCATE FACILITIES. INSTALL 3394 FEET OF 4 INCH POLY ALONG HARDEMAN
STREET AND ABANDON 2100 FEET OF 4 INCH CAST IRON AND 1100 FEET OF 3 INCH
STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
14 080.49679 2
RELOCATE FACILITIES. INSTALL (51) 0.75 POLY SERVICES ALONG EDGEWOOD
TERRACE AND ABANDON (51) 0.75 STEEL SERVICES TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
15 080.49984 1
RELOCATE FACILITIES. INSTALL 175 FEET OF 2 INCH, 1850 FEET OF 4 INCH, 210
FEET OF 6 INCH POLY ALONG MEADOW LANE AND ABANDON 65 FEET OF 2 INCH,
265 FEET OF 3 INCH, 1635 FEET OF 4 INCH, 85 FEET OF 6 INCH STEEL, 95 FEET OF 2
INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
16 080.50331 1
RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY ALONG SKYLINE DRIVE
AND ABANDON 700 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW
DRAINAGE IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
17 080.50421 1
RELOCATE FACILITIES. INSTALL (77) 0.75 INCH SERVICES ALONG HILL STREET AND
ABANDON (77) 0.75 INCH SERVICES TO ACCOMMODATE CITY OF DALLAS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
MTX Relocations
Page 1 of 12
587
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED
IN GAS PLANT
IN SERVICE
REIMBURSEMENT
RECEIVED?
YES/NO
COMMENTS / ADDITIONAL
INFORMATION RELATED TO THE
AMOUNT IN COLUMN "COST"
18 080.50424 1
RELOCATE FACILITIES. INSTALL (7) 0.75 INCH POLY SERVICES ALONG AIRLINE
STREET AND ABANDON 1830 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY
OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
19 080.50504 1
RELOCATE FACILITIES. INSTALL (27) 0.75 INCH POLY SERVICES ALONG HARWEN
TERRACE AND ABANDON (27) POLY SERVICES TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
20 080.50529 2
RELOCATE FACILITIES. INSTALL 98 POLY SERVICES AND ABANDON 98 STEEL
SERVICES ALONG ROSEDALE STREET TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
21 080.50745 3
RELOCATE FACILITIES. INSTALL 240 FEET OF 2 INCH, 120 FEET OF 3 INCH, AND 60
FEET OF 4 INCH POLY ALONG FOREST HILL DRIVE AND ABANDON 220 FEET OF 2
INCH, 100 FEET OF 3 INCH, AND 50 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY
OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FOREST HILL SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
22 080.50830 1
RELOCATE FACILITIES. INSTALL (19) 0.75 INCH POLY SERVICES ALONG SURREY
DRIVE AND ABANDON (19) 0.75 INCH SERVES TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
23 080.51030 2
RELOCATE FACILITIES. INSTALL 937 FEET OF 6 INCH, 567 FEET OF 4 INCH POLY AND
ABANDON 920 FEET OF 6 INCH STEEL, 690 FEET OF 4 INCH CAST IRON ALONG
SYLVANIA TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
24 080.51053 5
RELOCATE FACILITIES. INSTALL 1320 FEET OF 4 INCH AND 560 FEET OF 2 INCH
POLY ALONG DAVIS STREET AND ABANDON 1635 FEET OF 8 INCH, 320 FEET OF 6
INCH AND 250 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
25 080.51054 3
RELOCATE FACILITIES. INSTALL 1050 FEET OF 4 INCH, 640 FEET OF 2 INCH AND 60
FEET OF 8 INCH POLY AND ABANDON 1330 FEET OF 8 INCH, 50 FEET OF 6 INCH, 895
FEET OF 4 INCH CAST IRON, AND 50 FEET OF 8 INCH STEEL ALONG DAVIS STREET
TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
26 080.51142 507
RELOCATE FACILITIES. INSTALL 293 FEET OF 4 INCH, 807 FEET OF 6 INCH, 10 FEET
OF 8 INCH AND 10320 FEET OF 12 INCH POLY ALONG CROWLEY ROAD AND
ABANDON 2940 FEET OF 4 INCH, 2695 FEET OF 6 INCH AND 195 FEET OF 8 INCH
POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
27 080.51176 2
RELOCATE FACILITIES. INSTALL 800 FEET OF 8 INCH ALONG OVERTON AND
ABANDON 800 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
28 080.51220 30,993
RELOCATE FACILITIES. INSTALL 16 FEET OF 6 INCH, 11 FEET OF 8 INCH AND 12255
FEET OF 12 INCH STEEL ALONG LINE O1 AND ABANDON 2365 FEET OF 3 INCH, 6136
FEET OF 4 INCH, 3026 FEET OF 6 INCH AND 4980 FEET OF 8 INCH STEEL TO
ACCOMMODATE PRIME POINTE DEVELOPMENT RESIDENTIAL LANCASTER
RELOCATION OF
FACILITIES DECEMBER YES
$3,815,605.00 CREDITED IN 2017 TO
ACCOUNT 101. $832,602.28 DEBITED IN
2017 FOR REFUND EXCESS CIAC.
REIMBURSEMENT COMPLETE.
29 080.51250 1
RELOCATE FACILITIES. INSTALL 840 FEET OF 6 INCH AND 200 FEET OF 4 INCH POLY
ALONG LAFAYETTE AVENUE AND ABANDON 840 FEET OF 6 INCH STEEL TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
30 080.51317 1
RELOCATE FACILITIES. INSTALL 1642 FEET OF 2 INCH POLY ALONG ELINOR STREET
AND ABANDON 1642 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
31 080.51318 1
RELOCATE FACILITIES. INSTALL 398 FEET OF 2 INCH, 1834 FEET OF 4 INCH POLY
AND ABANDON 615 FEET OF 2 INCH, 1456 FEET OF 3 INCH STEEL ALONG HOLLIS
STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
32 080.51395 1
RELOCATE FACILITIES. INSTALL 1560 FEET OF 4 INCH POLY ALONG WILKES STREET
AND ABANDON 1500 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF BRYAN
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
33 080.51396 1
RELOCATE FACILITIES. INSTALL 305 FEET OF 2 INCH AND 105 FEET OF 6 INCH POLY
ALONG ASHBURY DRIVE AND ABANDON 100 FEET OF 1-1/4 INCH, 80 FEET OF 2 INCH,
AND 100 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF ARLINGTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
34 080.51405 1
RELOCATE FACILITIES. INSTALL 945 FEET OF 2 INCH POLY ALONG SOUTH ROBERTS
AND ABANDON 945 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
35 080.51676 (1)
RELOCATE FACILITIES. INSTALL 1470 FEET OF 4 INCH POLY AND ABANDON 720
FEET OF 4 INCH CAST IRON ALONG CARNATION AVENUE TO ACCOMMODATE CITY
OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
MTX Relocations
Page 2 of 12
588
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED
IN GAS PLANT
IN SERVICE
REIMBURSEMENT
RECEIVED?
YES/NO
COMMENTS / ADDITIONAL
INFORMATION RELATED TO THE
AMOUNT IN COLUMN "COST"
36 080.51702 3
RELOCATE FACILITIES. INSTALL 2600 FEET OF 4-INCH AND 180 FEET OF 2-INCH
POLY AND ABANDON 2200 FEET OF 4-INCH STEEL, 1,200 FEET OF 4-INCH POLY
ALONG STATE HIGHWAY 21 TO ACCOMMODATE CITY OF BRYAN IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
37 080.51801 1
RELOCATE FACILITIES. INSTALL 1712 FEET OF 2 INCH POLY AND ABANDON 997
FEET OF 4 INCH STEEL AND 860 FEET OF 4 INCH CAST IRON ALONG SYLVANIA TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
38 080.51806 5
RELOCATE FACILITIES. INSTALL 3126 FEET OF 4 INCH POLY ALONG YUCCA AVENUE
AND ABANDON 2736 FEET OF 4 INCH CAST IRON AND 540 FEET OF 4 INCH STEEL TO
ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
39 080.51843 21
RELOCATE FACILITIES. INSTALL 1715 FEET OF 4 INCH POLY AND ABANDON 678
FEET OF 4 INCH POLY AND 984 FEET OF 4 INCH CAST IRON ALONG DOROTHY LANE
TO ACCOMODATE A CITY OF FORT WORTH DRAINAGE IMPROVEMENT PROJECT TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
40 080.51920 23,907
RELOCATE FACILITIES. INSTALL 720 FEET OF 2 INCH, 450 FEET OF 4 INCH, 485 FEET
OF 6 INCH AND 950 FEET OF 8 INCH POLY ALONG IH35 AND ABANDON 425 FEET OF 4
INCH STEEL, 440 FEET OF 8 INCH, 690 FEET OF 6 INCH, 315 FEET OF 3 INCH, AND 470
FEET OF 2 INCH POLY TO ACCOMMODATE TXDOT PROJECT.ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES APRIL NO
$815,369.08 CREDITED IN 2019 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
41 080.52029 1
RELOCATE FACILITIES. INSTALL 398 FEET OF 2 INCH, 342 FEET OF 4 INCH POLY
ALONG AVENUE U AND ABANDON 84 FEET OF 3 INCH, 73 FEET OF 2 INCH, 88 FEET
OF 1 1/14 POLY, 12 FEET OF 3 INCH, 316 FEET OF 4 INCH, 93 FEET OF 3 STEEL TO
ACCOMMODATE CITY OF TEMPLE STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS TEMPLE SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
42 080.52036 39
RELOCATE FACILITIES. INSTALL 1380 FEET OF 4 INCH POLY AND 400 FEET OF 6
INCH POLY ALONG GOLIAD STREET AND ABANDON 173 FEET OF 3 INCH POLY, 1010
FEET OF 4 INCH POLY AND 383 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY OCTOBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
43 080.52108 1,586,604
RELOCATE FACILITIES. INSTALL 485 FEET OF 2 INCH POLY AND 6490 FEET OF 6
INCH POLY; AND 800 FEET OF 10 INCH STEEL CASING ALONG BONNIE BRAE STREET
AND ABANDON 490 FEET OF 2 INCH POLY, 935 FEET OF 4 INCH POLY AND 5,765
FEET OF 4 INCH STEEL TO ACCOMODATE CITY OF DENTON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
44 080.52540 1
RELOCATE FACILITIES. INSTALL 400 FEET OF 8 INCH AND 150 FEET OF 4 INCH
POLY ALONG LEMMON AVENUE AND ABANDON 154 FEET OF 6 INCH AND 437 FEET
OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
45 080.53221 278
RELOCATE FACILITIES. INSTALL 324 FEET OF 2 INCH AND 7346 FEET OF 4 INCH
POLY AND ABANDON 4530 FEET OF 2 INCH STEEL AND 25 FEET OF 2 INCH POLY
AND 325 FEET OF 4 INCH POLY ALONG ABRAM STREET TO ACCOMMODATE CITY OF
ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY OCTOBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
46 080.53384 183
RELOCATE FACILITIES. INSTALL 310 FEET OF 6 INCH AND 5927 FEET OF 8 INCH
POLY ALONG SOUTHWEST PARKWAY AND ABANDON 37 FEET OF 4 INCH, 208 FEET
OF 6 INCH, AND 5185 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF GRAND
PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GRAND PRAIRI SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
47 080.53535 1
RELOCATE FACILITIES. INSTALL 4560 FEET OF 6 INCH, 320 FEET OF 4 INCH, AND 760
FEET OF 2 INCH POLY ALONG PIPELINE ROAD AND ABANDON 4560 FEET OF 6 INCH,
320 FEET OF 4 INCH, AND 760 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
HURST STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HURST SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
48 080.53591 44
RELOCATE FACILITIES. INSTALL 6 FEET OF 2 INCH, 8 FEET OF 3 INCH, 231 FEET OF 4
INCH, AND 1091 FEET OF 6 INCH POLY ALONG NEW YORK AVENUE AND ABANDON
890 FEET OF 6 INCH, 160 FEET OF 3 INCH, AND 150 FEET OF 2 INCH POLY TO
ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
49 080.53909 4
RELOCATE FACILITIES. INSTALL 3900 FEET OF 24 INCH STEEL AND ABANDON 3175
FEET OF 24 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS WHEATLAND
ROAD IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
50 080.54000 1
RELOCATE FACILITIES. INSTALL 807 FEET OF 2 INCH AND 1356 FEET OF 6 INCH
POLY ALONG BELKNAP AND ABANDON 50 FEET OF 2 INCH, 55 FEET OF 6 INCH POLY
AND 1356 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
51 080.54002 1
RELOCATE FACILITIES. INSTALL 957 FEET OF 4 INCH POLY ALONG MONTREAL
CIRCLE AND ABANDON 875 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
HALTOM STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HALTOM CITY SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
MTX Relocations
Page 3 of 12
589
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED
IN GAS PLANT
IN SERVICE
REIMBURSEMENT
RECEIVED?
YES/NO
COMMENTS / ADDITIONAL
INFORMATION RELATED TO THE
AMOUNT IN COLUMN "COST"
52 080.54043 5
RELOCATE FACILITIES. INSTALL 3706 FEET OF 4 INCH ALONG BOYD AVENUE AND
ABANDON 81 FEET OF 2 INCH, 482 FEET OF 3 INCH , 1681 FEET OF 4 INCH CAST
IRON , 2657 FEET OF 6 INCH CAST IRON , 220 FEET OF 4 INCH POLY, AND 50 FEET
OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
53 080.54046 75
RELOCATE FACILITIES. INSTALL 1780 FEET OF 4 INCH POLY ALONG FIELDER ROAD
AND ABANDON 1765 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF
ARLINGTON WATER AND SANITARY SEWER RENEWAL PROJECT IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
54 080.54090 2
RELOCATE FACILITIES. INSTALL 280 FEET OF 6 INCH POLY ALONG OLD BURLESON
ROAD AND ABANDON 270 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN TARRANT COUNTY IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
55 080.54112 16
RELOCATE FACILITIES. INSTALL 2300 FEET OF 4 INCH AND 200 FEET OF 2 INCH
POLY AND ABANDON 1030 FEET OF 4 INCH, 265 FEET OF 2 INCH POLY, 180 FEET OF
4 INCH AND 550 FEET OF 2 INCH STEEL ALONG HICKORY STREET TO
ACCOMMODATE CITY OF DENTON STREET PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
56 080.54160 6
RELOCATE FACILITIES. INSTALL 2080 FEET OF 12 INCH STEEL ALONG SUBLETT
ROAD AND ABANDON 51 FEET OF 2 INCH, 570 FEET OF 4 INCH POLY, AND 1720 FEET
OF 12 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
57 080.54166 4
RELOCATE FACILITIES. INSTALL 2200 FEET OF 4 INCH AND 1400 FEET OF 2 INCH
POLY ALONG SOUTH COLLEGE AVENUE AND ABANDON 1700 FEET OF 4 INCH, 110
FEET OF 3 INCH, 900 FEET OF 2 INCH STEEL, 320 FEET OF 2 INCH, AND 60 FEET OF 4
INCH POLY TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY OCTOBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
58 080.54253 2
RELOCATE FACILITIES. INSTALL 3961 FEET OF 4 INCH POLY ALONG NORTHWEST
PARKWAY AND ABANDON 2930 FEET OF 4 INCH STEEL, 1005 FEET OF 4 INCH, 392
FEET OF 3 INCH, AND 86 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
59 080.54264 17
RELOCATE FACILITIES. INSTALL 1023 FEET OF 4 INCH, 210 FEET OF 2 INCH POLY
AND ABANDON 1023 FEET OF 4 INCH STEEL ALONG ANGLE AVENUE TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
60 080.54270 22
RELOCATE FACILITIES. INSTALL 2715 FEET OF 4 INCH POLY AND ABANDON 2666
FEET OF 4 INCH CAST IRON ALONG ROBINSON STREET TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS
RAILROAD COMISSION RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
61 080.54273 1
RELOCATE FACILITIES. INSTALL 3458 FEET OF 6 INCH AND 140 FEET OF 2 INCH
POLY ALONG OLD RANDOL MILL ROAD AND ABANDON 3236 FEET OF 6 INCH, 210
FEET OF 2 INCH STEEL AND 334 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
62 080.54287 1
RELOCATE FACILITIES. INSTALL 850 FEET OF 2 INCH POLY AND ABANDON 840
FEET OF 3 INCH STEEL ALONG CLARENDON TO ACCOMMODATE CITY OF COCKRELL
HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS COCKRELL HILL SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
63 080.54291 5
RELOCATE FACILITIES. INSTALL 273 FEET OF 2 INCH , 244 FEET OF 4 INCH, 2040
FEET OF 6 INCH POLY AND ABANDON 224 FEET OF 2 INCH, 236 FEET OF 4 INCH, 1986
FEET OF 6 INCH POLY ALONG COLONY STREET TO ACCOMMODATE CITY OF
CARROLLTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS THE COLONY SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
64 080.54428 10
RELOCATE FACILITIES. INSTALL 2285 FEET OF 4 INCH POLY ALONG WABASH
AVENUE AND ABANDON 4124 FEET OF 4 INCH, 125 FEET OF 6 INCH STEEL, 125 FEET
OF 6 INCH, AND 120 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
65 080.54854 1
RELOCATE FACILITIES. INSTALL 3093 FEET OF 6 INCH AND 1276 FEET OF 2 INCH
POLY ALONG US 377 AND ABANDON 3000 FEET OF 2 INCH STEEL AND 160 FEET OF
2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
66 080.54858 28
RELOCATE FACILITIES. INSTALL 2386 FEET OF 6 INCH, 350 FEET OF 4 INCH AND 1636
FEET OF 2 INCH POLY AND ABANDON 1520 FEET OF 2 INCH, 300 FEET OF 3 INCH
STEEL AND 610 FEET OF 2 INCH POLY ALONG US 377 TO ACCOMMODATE CITY OF
DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
67 080.54859 1
RELOCATE FACILITIES. INSTALL 650 FEET OF 6 INCH AND 200 FEET OF 4 INCH POLY
AND ABANDON 650 FEET OF 6 INCH AND 200 FEET OF 4 INCH POLY ALONG EAST
BROAD STREET TO ACCOMMODATE CITY OF MANSFIELD STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS MANSFIELD SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
MTX Relocations
Page 4 of 12
590
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED
IN GAS PLANT
IN SERVICE
REIMBURSEMENT
RECEIVED?
YES/NO
COMMENTS / ADDITIONAL
INFORMATION RELATED TO THE
AMOUNT IN COLUMN "COST"
68 080.55033 1
RELOCATE FACILITIES. INSTALL 374 FEET OF 2 INCH POLY AND ABANDON 337
FEET OF 2 INCH POLY ALONG THROCKMORTON TO ACCOMMODATE CITY OF
ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
69 080.55060 82
RELOCATE FACILITIES. INSTALL 5175 FEET OF 2 INCH POLY AND ABANDON 3324
FEET OF 4 INCH STEEL, 350 FEET OF 4 INCH POLY AND 70 FEET OF 4 INCH CAST
IRON ALONG BERKLEY PLACE TO ACCOMMODATE CITY OF FORT WORTH STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
70 080.55064 1
RELOCATE FACILITIES. INSTALL 1810 FEET OF 4 INCH AND 1010 FEET OF 2 INCH
POLY AND ABANDON 680 FEET OF 2 INCH STEEL ALONG CHURCH STREET TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
71 080.55147 1,456
RELOCATE FACILITIES. INSTALL 20 FEET OF 4 INCH, 10 FEET OF 6 INCH, AND 1575
FEET OF 8 INCH POLY AND ABANDON 1530 FEET OF 4 INCH POLY ALONG
INTERSTATE HIGHWAY 30 TO ACCOMMODATE TXDOT HIGHWAY IMPROVEMENT
PROJECT.ALL CUSTOMERS ROCKWALL
RELOCATION OF
FACILITIES APRIL NO
$212,453.13 CREDITED IN 2018 TO
ACCOUNT 101. REIMBURSEMENT
COMPLETE.
72 080.55221 1
RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH AND 175 FEET OF 4 INCH POLY
ALONG STAFFORD DRIVE AND ABANDON 50 FEET OF 1.25 INCH, 265 FEET OF 2 INCH
AND 170 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
73 080.55304 86
RELOCATE FACILITIES. INSTALL 2725 FEET OF 4 INCH POLY ALONG SIX FLAGS
ROAD AND ABANDON 50 FEET OF 2 INCH, 86 FEET OF 4 INCH POLY AND 53 FEET OF
3 INCH, AND 2537 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
74 080.55320 116
RELOCATE FACILITIES. INSTALL 3000 FEET OF 4 INCH POLY AND ABANDON 117
FEET OF 2 INCH, 1888 FEET OF 4 INCH STEEL AND 125 FEET OF 2 INCH, 25 FEET OF
4 INCH AND 20 FEET OF 6 INCH POLY ALONG FOREST STREET TO ACCOMMODATE
CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
75 080.55351 106
RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH AND 3045 FEET OF 4 INCH
POLY AND ABANDON 2487 FEET OF 2 INCH STEEL, 437 FEET OF 2 INCH, AND 180
FEET OF 4 INCH POLY ALONG PECAN STREET TO ACCOMMODATE THE CITY OF
ROANOKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ROANOKE SYSTEM INTEGRITY OCTOBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
76 080.55422 2
RELOCATE FACILITIES. INSTALL 1360 FEET OF 2 INCH POLY ALONG ROSEHILL ROAD
AND ABANDON 1360 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF GARLAND
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
77 080.55423 2
RELOCATE FACILITIES. INSTALL 840 FEET OF 4 INCH POLY ALONG LYONS ROAD
AND ABANDON 810 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF GARLAND
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
78 080.55424 3
RELOCATE FACILITIES. INSTALL 680 FEET OF 4 INCH POLY ALONG FALLBROOK
DRIVE AND ABANDON 675 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF
GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
79 080.55565 2
RELOCATE FACILITIES. INSTALL 2425 FEET OF 2 INCH POLY ALONG GARDENVIEW
AND ABANDON 2486 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DALLAS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
80 080.55568 3
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH, 1750 FEET OF 4 INCH, AND 100
FEET OF 8 INCH POLY ALONG HIGHLAND AND ABANDON 100 FEET OF 2 INCH, 2032
FEET OF 6 INCH, AND 294 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF
DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
81 080.55642 131
RELOCATE FACILITIES. INSTALL 5745 FEET OF 4 INCH POLY ALONG LOTUS AVENUE
AND ABANDON 1800 FEET OF 6 INCH CAST IRON, 540 FEET OF 6 INCH, 580 FEET OF
3 INCH, AND 465 FEET OF 2 INCH STEEL, AND 185 FEET OF 6 INCH POLY TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
82 080.55697 2
RELOCATE FACILITIES. INSTALL 450 FEET OF 6 INCH POLY ALONG PRESTON ROAD
AND ABANDON 350 FEET OF 6 INCH POLY AND 100 FEET OF 4 INCH POLY TO
ACCOMMODATE CITY OF FRISCO STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FRISCO SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
83 080.55923 2
RELOCATE FACILITIES. INSTALL 2186 FEET OF 2 INCH POLY AND (29) POLY
SERVICES ALONG SYLVANIA AVENUE AND ABANDON (29) STEEL SERVICES AND 30
FEET OF 2 INCH CAST IRON TO ACCOMMODATE THE CITY OF FORT WORTH CITY
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
84 080.55926 15
RELOCATE FACILITIES. INSTALL 3114 FEET OF 4 INCH POLY AND ABANDON 3100
FEET OF 4 INCH STEEL ALONG JACQELINE ROAD TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RAILROAD
COMISSION RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
MTX Relocations
Page 5 of 12
591
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED
IN GAS PLANT
IN SERVICE
REIMBURSEMENT
RECEIVED?
YES/NO
COMMENTS / ADDITIONAL
INFORMATION RELATED TO THE
AMOUNT IN COLUMN "COST"
85 080.55966 1
RELOCATE FACILITIES. INSTALL 900 FEET OF 6 INCH POLY ALONG RALPH HALL
PARKWAY AND ABANDON 817 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ROCKWALL SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
86 080.56105 379
RELOCATE FACILITIES. INSTALL 300 FEET OF 8 INCH POLY AND ABANDON 290 FEET
OF 4 INCH POLY ALONG INTERSTATE HIGHWAY 30 TO ACCOMMODATE TXDOT
HIGHWAY IMPROVEMENT PROJECT.ALL CUSTOMERS ROCKWALL
RELOCATION OF
FACILITIES APRIL NO
$55,321.83 CREDITED IN 2018 TO
ACCOUNT 101. REIMBURSEMENT
COMPLETE.
87 080.56237 1
RELOCATE FACILITIES. INSTALL 620 FEET OF 2 INCH POLY ALONG SUNNYBROOK
AND ABANDON 620 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF GARLAND
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS GARLAND SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
88 080.56251 5
RELOCATE FACILITIES. INSTALL 453 FEET OF 6 INCH POLY ALONG JIM CRYSTAL
ROAD AND ABANDON 453 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
89 080.56410 2
RELOCATE FACILITIES. INSTALL 604 FEET OF 2 INCH POLY ALONG MOTLEY DRIVE
AND ABANDON 604 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF MESQUITE
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS MESQUITE SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
90 080.56433 8
RELOCATE FACILITIES. INSTALL 945 FEET OF 4 INCH AND 163 FEET OF 2 INCH POLY
ALONG BRENNAN AVENUE AND ABANDON 730 FEET OF 4 INCH, 25 FEET OF 2 INCH
STEEL AND 206 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
91 080.56497 4
RELOCATE FACILITIES. INSTALL 680 FEET OF 8 INCH POLY ALONG CRESTVIEW
DRIVE AND ABANDON 680 FEET OF 8 INCH STEEL AND 400 FEET OF 4 INCH CAST
IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT
IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY OCTOBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
92 080.56571 5,660
RELOCATE FACILITIES. INSTALL 1500 FEET OF 6 INCH STEEL AND ABANDON 740
FEET OF 3 INCH STEEL AND 498 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY
OF ALVARADO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ALVARADO SYSTEM INTEGRITY OCTOBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
93 080.56586 6
RELOCATE FACILITIES. INSTALL 2006 FEET OF 4 INCH POLY ALONG ROCKHILL ROAD
AND ABANDON 1990 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
94 080.56662 73
RELOCATE FACILITIES. INSTALL 1785 FEET OF 6 INCH POLY AND ABANDON 1785
FEET OF 6 INCH STEEL IN HAYNES AVENUE TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
95 080.56731 1
RELOCATE FACILITIES. INSTALL 60 FEET OF 2 INCH POLY ALONG MONTCLAIR
PLACE AND ABANDON 4 FEET OF 2 INCH STEEL AND 66 FEET OF 2 INCH POLY TO
ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
96 080.56743 9
RELOCATE FACILITIES. INSTALL 2995 FEET OF 4 INCH POLY AND ABANDON 2074
FEET OF 4 INCH CAST IRON AND 694 FEET OF 4 INCH AND 200 FEET OF 2 INCH
STEEL ALONG COVELLO AVENUE TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
97 080.56928 1
RELOCATE FACILITIES. INSTALL 560 FEET OF 4 INCH POLY ALONG BAYLOR STREET
AND ABANDON 52 FEET OF 2 INCH AND 351 FEET OF 4 INCH STEEL AND 148 FEET
OF 2 INCH POLY TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ENNIS SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
98 080.56974 1
RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY ALONG GREENBRIER
ROAD AND ABANDON 764 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WAXAHACHIE SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
99 080.56991 4
RELOCATE FACILITIES. INSTALL 1,500 FEET OF 2 INCH POLY ALONG ROE STREET
AND ABANDON 1,500 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF
WHITE SETTLEMENT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS WHITE SETTLEMENT SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
100 080.56995 2
RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG VIRGINIA STREET
AND ABANDON 885 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF BRYAN
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
101 080.57058 4
RELOCATE FACILITIES. INSTALL 1689 FEET OF 4 INCH POLY ALONG 4TH STREET
AND ABANDON 1316 FEET OF 4 INCH CAST IRON AND 373 FEET OF 2 INCH STEEL TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
102 080.57069 4
RELOCATE FACILITIES. INSTALL 1800 FEET OF 4 INCH AND 2065 FEET OF 2 INCH
POLY ALONG MOUNT VERNON AVENUE AND ABANDON 1050 FEET OF 6 INCH, 1330
FEET OF 2 INCH STEEL, 50 FEET OF 6 INCH, 630 FEET OF 4 INCH, 60 FEET OF 2 INCH
POLY, 635 FEET OF 4 INCH, AND 750 OF 3 INCH CAST IRON, 1330 FEET OF 2 INCH
STEEL AND 60 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
MTX Relocations
Page 6 of 12
592
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED
IN GAS PLANT
IN SERVICE
REIMBURSEMENT
RECEIVED?
YES/NO
COMMENTS / ADDITIONAL
INFORMATION RELATED TO THE
AMOUNT IN COLUMN "COST"
103 080.57070 16
RELOCATE FACILITIES. INSTALL 1480 FEET OF 4 INCH POLY ALONG MILLETT
ROAD,315 FEET OF 2 INCH POLY AND ABANDON 1480 FEET OF 4 INCH AND 315 FEET
OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE
8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
104 080.57171 147
RELOCATE FACILITIES. INSTALL 2518 FEET OF 2 INCH, 569 FEET OF 4 INCH, 10 FEET
OF 6 INCH AND 1255 FEET OF 8 INCH POLY ALONG MOUNT VERNON AVENUE AND
ABANDON 370 FEET OF 2 INCH, 951 FEET OF 3 INCH, 500 FEET OF 4 INCH, 1613 FEET
OF 6 INCH, 1050 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
105 080.57248 (2)
RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY ALONG SHILOH ROAD
AND ABANDON 350 FEET OF 4 INCH POLY TO ACCOMMODATE PLANO ROAD
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
106 080.57261 1,065
RELOCATE FACILITIES. INSTALL 5000 FEET OF 4 INCH AND 7500 FEET OF 2 INCH
POLY ALONG FOURTH STREET AND ABANDON 4900 FEET OF 4 INCH, 6000 FEET OF 2
INCH AND 1500 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF KAUFMAN
ROAD AND DRAINAGE IMPROVEMENTS PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS KAUFMAN SYSTEM INTEGRITY OCTOBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
107 080.57262 1
RELOCATE FACILITIES. INSTALL 580 FEET OF 4 INCH POLY ALONG BOB JONES
ROAD AND ABANDON 575 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF
SOUTHLAKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS SOUTHLAKE SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
108 080.57282 70
RELOCATE FACILITIES. INSTALL 13 FEET OF 2 INCH, 6 FEET OF 4 INCH, AND 2347
FEET OF 6 INCH POLY ALONG FISH CREEK ROAD AND ABANDON 61 FEET OF 2 INCH,
55 FEET OF 4 INCH, AND 5280 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH
RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS GRAND PRAIRIE SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
109 080.57285 5
RELOCATE FACILITIES. INSTALL 635 FEET OF 2 INCH POLY AND ABANDON 618
FEET OF 2 INCH STEEL AND 49 FEET OF 2 INCH POLY ALONG ANDREW AVENUE TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
110 080.57371 3
RELOCATE FACILITIES. INSTALL 1070 FEET OF 2 INCH POLY ALONG EVANS AVENUE
AND ABANDON 330 FEET OF 6 INCH, 420 FEET OF 4 INCH CAST IRON, 50 FEET OF 6
INCH, AND 205 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
111 080.57388 1
RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY AND ABANDON 383 FEET
OF 3 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BRYAN SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
112 080.57419 1
RELOCATE FACILITIES. INSTALL 86 FEET OF 4 INCH POLY AND ABANDON 170 FEET
OF 2 INCH, 132 FEET OF 3 INCH STEEL AND 80 FEET OF 2 INCH POLY AND ALONG
PECAN STREET TO ACCOMMODATE CITY OF HUTTO STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS HUTTO SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
113 080.57529 1
RELOCATE FACILITIES. INSTALL 620 FEET OF 2 INCH POLY AND ABANDON 645 FEET
OF 4 INCH STEEL ALONG LOCUST ROAD TO ACCOMMODATE THE CITY OF FORT
WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF
TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
114 080.57568 125
RELOCATE FACILITIES. INSTALL 2898 FEET OF 4 INCH POLY ALONG GALVEZ AND
ABANDON 1607 FEET OF 4 INCH CAST IRON AND 1000 FEET OF 4 INCH STEEL TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
115 080.57580 4
RELOCATE FACILITIES. INSTALL 1124 FEET OF 2 INCH POLY AND ABANDON 464
FEET OF 2 INCH STEEL AND 646 FEET OF 2 INCH POLY ALONG ROBIN LANE TO
ACCOMMODATE CITY OF BERTRAM STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS BERTRAM SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
116 080.57615 14
RELOCATE FACILITIES. INSTALL (99) POLY SERVICES AND ABANDON (99) STEEL
SERVICES ALONG CAPITAL STREET TO ACCOMMODATE CITY OF ARLINGTON
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS ARLINGTON SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
117 080.57711 1
RELOCATE FACILITIES. INSTALL 2500 FEET OF 4 INCH POLY ALONG NATIONAL
DRIVE AND ABANDON 2500 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF
ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ENNIS SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
118 080.57763 2
RELOCATE FACILITIES. INSTALL 897 FEET OF 4 INCH AND 2 FEET OF 6 INCH POLY
AND ABANDON 564 FEET OF 4 INCH CAST IRON ALONG CARTWRIGHT AVENUE TO
ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
119 080.57824 271
RELOCATE FACILITIES. INSTALL 2064 FEET OF 24 INCH STEEL ALONG WHEATLAND
ROAD AND ABANDON 1263 FEET OF 24 INCH STEEL TO ACCOMMODATE CITY OF
DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
120 080.57852 4
RELOCATE FACILITIES. INSTALL 2456 FEET OF 2 INCH AND 3212 FEET OF 4 INCH
POLY ALONG CHIMNEY HILL DRIVE AND ABANDON 903 FEET OF 2 INCH AND 2080
FEET OF 3 INCH STEEL AND 1371 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF
WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS WACO SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
MTX Relocations
Page 7 of 12
593
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED
IN GAS PLANT
IN SERVICE
REIMBURSEMENT
RECEIVED?
YES/NO
COMMENTS / ADDITIONAL
INFORMATION RELATED TO THE
AMOUNT IN COLUMN "COST"
121 080.57959 1
RELOCATE FACILITIES. INSTALL 1283 FEET OF 2 INCH, 3 FEET OF 3 INCH AND 2688
FEET OF 4 INCH POLY ALONG LINDA LANE AND ABANDON 8 FEET OF 1.25 INCH, 1027
FEET OF 2 INCH, 2499 FEET OF 3 INCH AND 252 FEET OF 4 INCH POLY TO
ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE
WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
122 080.58052 12
RELOCATE FACILITIES. INSTALL 27 FEET OF 2 INCH POLY ALONG LONE STAR DRIVE
AND ABANDON 546 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CEDAR PARK
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS CEDAR PARK SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
123 080.58113 1
RELOCATE FACILITIES. INSTALL 861 FEET OF 2 INCH POLY ALONG FOCH STREET
AND ABANDON 970 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT
WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS FORT WORTH SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
124 080.58131 3
RELOCATE FACILITIES. INSTALL 87 FEET OF 2 INCH AND 3 FEET OF 4 INCH POLY
ALONG JOMAR LANE AND ABANDON 81 FEET OF 2 INCH AND 9 FEET OF 4 INCH POLY
TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN
ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
125 080.58195 1
RELOCATE FACILITIES. INSTALL 296 FEET OF 6 INCH POLY ALONG MCDERMOTT
ROAD AND ABANDON 264 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF
PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS PLANO SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
126 080.58233 3
RELOCATE FACILITIES. INSTALL 20 FEET OF 2 INCH POLY ALONG CLIFF VIEW AND
ABANDON 90 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET
IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS
RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
127 080.58320 3
RELOCATE FACILITIES. INSTALL 1173 FEET OF 2 INCH AND 212 FEET OF 4 INCH
POLY ALONG ANNA DRIVE AND ABANDON 944 FEET OF 3 INCH STEEL AND 364 FEET
OF 3 INCH POLY TO ACCOMMODATE CITY OF ALLEN STREET IMPROVEMENT
PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS ALLEN SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
128 080.58452 9
RELOCATE FACILITIES. INSTALL (22) POLY SERVICES AND ABANDON (22) STEEL
SERVICES ALONG LANGLEY AVENUE TO ACCOMMODATE CITY OF EVERMAN
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS EVERMAN SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
129 080.58469 33
RELOCATE FACILITIES. INSTALL 35 FEET OF 4 INCH POLY ALONG 2ND STREET AND
ABANDON 4021 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS DALLAS SYSTEM INTEGRITY OCTOBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
130 080.58494 1
RELOCATE FACILITIES. INSTALL 227 FEET OF 4 INCH POLY ALONG DOMINIK DRIVE
AND ABANDON 227 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF COLLEGE
STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS COLLEGE STATION SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
131 080.58587 1
RELOCATE FACILITIES. INSTALL 321 FEET OF 4 INCH POLY ALONG NORTHWOOD
STREET AND ABANDON 321 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS CORSICANA SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
132 080.58608 3
RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH POLY ALONG TWIGHLIGHT AND
ABANDON 450 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW
STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION
OF TEXAS RULE 8.209.ALL CUSTOMERS LONGVIEW SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
133 080.58646 4
RELOCATE FACILITIES. INSTALL 603 FEET OF 4 INCH POLY AND ABANDON 586 FEET
OF 3 INCH STEEL AND 1221 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF
EASTLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS EASTLAND SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
134 080.58669 4
RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH POLY AND ABANDON 113 FEET
OF 2 INCH POLY ALONG BRANDYWINE STREET TO ACCOMMODATE CITY OF
DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
135 080.58723 5
RELOCATE FACILITIES. INSTALL 125 FEET OF 2 INCH POLY ALONG SAGEWOOD
STREET AND ABANDON 120 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF
DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD
COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS DENTON SYSTEM INTEGRITY SEPTEMBER NO
NOT REIMBURSABLE PURSUANT TO
FRANCHISE ORDINANCE.
136 080.64317 1,963
RELOCATE FACILITIES. INSTALL 353 FEET OF 4 INCH POLY AND ABANDON 340 FEET
OF 4 INCH POLY MAIN ALONG SH 360 TO ACCOMMODATE CONSTRUCTION OF
COMMERCIAL DRIVEWAY FOR AMERICAN AIRLINES FACILITY.ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES JANUARY YES
$187,725.70 CREDITED IN 2019 TO
ACCOUNT 101. $1,963.19 DEBITED IN
2022 TO ACCOUNT 101 FOR REFUND
EXCESS PAYMENT. REIMBURSEMENT
IS COMPLETE.
137 080.64629 (580)
RELOCATE FACILITIES. INSTALL 1042 FEET OF 4 INCH POLY AND ABANDON 1037
FEET OF 4 INCH POLY ALONG US 87TO ACCOMMODATE TXDOT ROAD
IMPROVEMENT PROJECT.ALL CUSTOMERS COMFORT
RELOCATION OF
FACILITIES JANUARY YES
$301,962.33 CREDITED IN 2022 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
138 080.65787 8,169
RELOCATE FACILITIES. INSTALL 780 FEET OF 4 INCH AND 37 FEET OF 6 INCH POLY
AND ABANDON 221 FEET OF 2 INCH STEEL, 287 FEET OF 2 INCH POLY, 268 FEET OF
3 INCH POLY AND 20 FEET OF 6 INCH POLY ALONG SOUTH BOUND FRONTAGE OF
IH35 TO ACCOMMODATE TXDOT PROJECT.ALL CUSTOMERS GEORGETOWN
RELOCATION OF
FACILITIES APRIL YES
$163,381.22 CREDITED IN 2021 TO
ACCOUNT 101. $8,169.06 DEBITED IN
2022 TO ACCOUNT 101 AND CREDITED
TO ACCOUNT 241 FOR CORRECTION
OF FRANCHISE FEE.
REIMBURSEMENT IS COMPLETE.
MTX Relocations
Page 8 of 12
594
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED
IN GAS PLANT
IN SERVICE
REIMBURSEMENT
RECEIVED?
YES/NO
COMMENTS / ADDITIONAL
INFORMATION RELATED TO THE
AMOUNT IN COLUMN "COST"
139 080.65968 78,409
RELOCATE FACILITIES. INSTALL 498 FEET OF 6 INCH POLY AND 229 FEET OF 4
INCH POLY AND ABANDON 503 FEET OF 6 INCH POLY AND 195 FEET OF 3 INCH
POLY ALONG HIGHWAY I35 AND NORTHWEST BLVD TO ACCOMMODATE CITY OF
GEORGETOWN STREET IMPROVEMENT PROJECT.ALL CUSTOMERS GEORGETOWN
RELOCATION OF
FACILITIES JULY YES
$128,395.37 CREDITED IN 2021 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
140 080.66002 14,312
RELOCATE FACILITIES. INSTALL 424 FEET OF 4 INCH POLY AND ABANDON 176 FEET
OF 4 INCH STEEL AND 239 FEET OF 4 INCH POLY TO ACCOMMODATE HEB
CONSTRUCTION PROJECT.ALL CUSTOMERS KERRVILLE
RELOCATION OF
FACILITIES FEBRUARY YES
$108,732.23 CREDITED IN 2019 TO
ACCOUNT 101. $14,311.50 DEBITED IN
2022 TO ACCOUNT 101 FOR REFUND
EXCESS PAYMENT. REIMBURSEMENT
IS COMPLETE.
141 080.66312 (2,649)
RELOCATE FACILITIES. INSTALL 375 FEET OF 8 INCH POLY ALONG TXDOT SH 45
FRONTAGE ROAD AND ABANDON 375 FEET OF 8 INCH POLY TO ACCOMMODATE
CITY OF PFLUGERVILLE WASTEWATER LINE PROJECT.ALL CUSTOMERS PFLUGERVILLE
RELOCATION OF
FACILITIES APRIL YES
$52,982.25 CREDITED IN 2021 TO
ACCOUNT 101. $2,649.11 CREDITED IN
2022 TO ACCOUNT 101 AND DEBITED
TO ACCOUNT 241 FOR CORRECTION
OF FRANCHISE FEE.
REIMBURSEMENT IS COMPLETE.
142 080.67255 2,904
RELOCATE FACILITIES. INSTALL 230 FEET OF 2 INCH POLY ALONG AMESBURY
DRIVE AND ABANDON 206 FEET OF 2 INCH POLY TO ACCOMMODATE MULTI-FAMILY
CONSTRUCTION.ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES MARCH YES
$28,314.75 CREDITED IN 2021 TO
ACCOUNT 101. $2,904.16 DEBITED IN
2022 TO ACCOUNT 101 FOR REFUND
EXCESS PAYMENT. REIMBURSEMENT
IS COMPLETE.
143 080.69631 3,395
RELOCATE FACILITIES. INSTALL 702 FEET OF 4 INCH POLY AND ABANDON 272 FEET
OF 4 INCH POLY ALONG COIT ROAD.ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES OCTOBER YES
$163,807.66 CREDITED IN 2021 TO
ACCOUNT 1010. THE COMPANY HAS
EITHER PROVIDED, PREPARED, OR
WILL PREPARE AN INVOICE TO
OBTAIN REIMBURSEMENT, WHICH
WILL BE CREDITED TO THE BOOKS
AND RECORDS OF THE COMPANY IN
FUTURE GRIP FILINGS.
144 080.69813 705
RELOCATE FACILITIES. INSTALL 120 FEET OF 3 INCH STEEL AND ABANDON 120 FEET
OF 3 INCH STEEL ALONG LINE W4 IN DENTON COUNTY TO ACCOMODATE STORM
SEWER PROJECT.ALL CUSTOMERS DENTON
RELOCATION OF
FACILITIES MARCH YES
$165,524.77 CREDITED IN 2020 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
145 080.69934 5,994
RELOCATE FACILITIES. INSTALL 349 FEET OF 4 INCH POLY AND ABANDON 334 FEET
OF 4 INCH POLY ALONG CITY LINE TO ACCOMMODATE DART SILVER LINE RAIL
PROJECT.ALL CUSTOMERS RICHARDSON
RELOCATION OF
FACILITIES DECEMBER YES
$132,377.65 CREDITED IN 2021 TO
ACCOUNT 1010. THE COMPANY HAS
EITHER PROVIDED, PREPARED, OR
WILL PREPARE AN INVOICE TO
OBTAIN REIMBURSEMENT, WHICH
WILL BE CREDITED TO THE BOOKS
AND RECORDS OF THE COMPANY IN
FUTURE GRIP FILINGS.
146 080.70137 4,936
RELOCATE FACILITIES: REPLACE METER INSTALLATIONS AND METER EQUIPMENT
DUE TO RELOCATION OF RK HALL ASPHALT PLANT.ALL CUSTOMERS GREENVILLE
RELOCATION OF
FACILITIES APRIL YES
$115,000.00 CREDITED IN 2020 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
147 080.70161 83,890
RELOCATE FACILITIES. INSTALL 251 FEET OF 2 INCH POLY AND ABANDON 243 FEET
OF 2 INCH STEEL TO ACCOMMODATE DART RAIL PROJECT.ALL CUSTOMERS ADDISON
RELOCATION OF
FACILITIES OCTOBER YES
$124,567.00 CREDITED IN 2021 TO
ACCOUNT 1010. THE COMPANY HAS
EITHER PROVIDED, PREPARED, OR
WILL PREPARE AN INVOICE TO
OBTAIN REIMBURSEMENT, WHICH
WILL BE CREDITED TO THE BOOKS
AND RECORDS OF THE COMPANY IN
FUTURE GRIP FILINGS.
148 080.70162 4,512
RELOCATE FACILITIES. INSTALL 482 FEET IF 4 INCH POLY AND ABANDON 296 FEET
OF 4 INCH POLY ALONG INDUSTRIAL TO ACCOMMODATE DART SILVE LINE RAIL
PROJECT.ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES DECEMBER YES
$160,149.17 CREDITED IN 2021 TO
ACCOUNT 1010. THE COMPANY HAS
EITHER PROVIDED, PREPARED, OR
WILL PREPARE AN INVOICE TO
OBTAIN REIMBURSEMENT, WHICH
WILL BE CREDITED TO THE BOOKS
AND RECORDS OF THE COMPANY IN
FUTURE GRIP FILINGS.
149 080.70406 (164,925)
INSTALL 6 INCH POLY ALONG ROSEDALE AND FOREST PARK IN FORT WORTH AND
ABANDON 12 INCH STEEL TO ACCOMMODATE THIRD PARTY DAMAGE.ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES FEBRUARY YES
$240,089.25 CREDITED IN 2021 TO
ACCOUNT 101. $5,358.08 DEBITED IN
2022 TO ACCOUNT 101 FOR REFUND
EXCESS PAYMENT. REIMBURSEMENT
IS COMPLETE.
150 080.70444 (62,295)
RELOCATE FACILITIES. INSTALL 935 FEET OF 20 INCH STEEL AND ABANDON 925
FEET OF 20 INCH STEEL ALONG LA PRADA DRIVE TO ACCOMMODATE TXDOT
IMPROVEMENT PROJECT.ALL CUSTOMERS MESQUITE
RELOCATION OF
FACILITIES DECEMBER YES
$1,312,820.26 CREDITED IN 2021 TO
ACCOUNT 101. $76,031.80 CREDITED
IN 2022 TO ACCOUNT 101 FOR RE-
BILL. REIMBURSEMENT IS COMPLETE.
151 080.70478 17,317
RELOCATE FACILITIES. INSTALL 350 FEET OF 6 INCH POLY AND ABANDON 250 FEET
OF 6 INCH POLY TO ACCOMMODATE CONSTRUCTION ON TELECOM LINE.ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES NOVEMBER YES
$144,305.52 CREDITED IN 2021 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
152 080.70492 84,617
RELOCATE FACILITIES. INSTALL 492 FEET OF 2 INCH POLY ALONG PINYON TREE
AND ABANDON 455 FEET OF 2 INCH AND 145 FEET OF 3 INCH POLY TO
ACCOMMODATE THE CITY OF DALLAS.ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES SEPTEMBER YES
$206,093.87 CREDITED IN 2021 TO
ACCOUNT 101. $84,616.72 DEBITED IN
2022 TO ACCOUNT 101 FOR REFUND
EXCESS PAYMENT. REIMBURSEMENT
IS COMPLETE.
153 080.70590 (96,432)
RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY AND 780 FEET OF 2"
POLY AND ABANDON 700 FEET OF 4 POLY TO ACCOMMODATE THE CONSTRUCTION
OF SMU RESIDENTIAL.ALL CUSTOMERS UNIVERSITY PARK
RELOCATION OF
FACILITIES APRIL YES
$96,432.43 CREDITED IN 2022 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
MTX Relocations
Page 9 of 12
595
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED
IN GAS PLANT
IN SERVICE
REIMBURSEMENT
RECEIVED?
YES/NO
COMMENTS / ADDITIONAL
INFORMATION RELATED TO THE
AMOUNT IN COLUMN "COST"
154 080.70894 23,070
RELOCATE FACILITIES. INSTALL 5803 FEET OF 16 INCH STEEL LINE 01-1 AND
ABANDON 4083 FEET OF 6 INCH STEEL TO ACCOMMODATE PRIVATE DEVELOPMENT
PROJECT.ALL CUSTOMERS LANCASTER
RELOCATION OF
FACILITIES DECEMBER YES
$1,289,859.00 CREDITED IN 2021 TO
ACCOUNT 101. $172,508.48 CREDITED
IN 2021 TO ACCOUNT 101 FOR RE-
BILL. REIMBURSEMENT IS COMPLETE.
155 080.71129 (246,358)
RELOCATE FACILITIES. INSTALL 275 FEET OF 2 INCH, 480 FEET OF 4 INCH, 1000
FEET OF 6 INCH AND 305 FEET OF 8 INCH POLY ALONG SKILLMAN STREET AND
ABANDON 690 FEET OF 2 INCH AND 220 FEET OF 3 INCH POLY AND 1390 FEET OF 4
INCH STEEL TO ACCOMMODATE TXDOT PROJECT.ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES JULY YES
$635,520.33 CREDITED IN 2021 TO
ACCOUNT 101. $246,755.30 CREDITED
IN 2022 TO ACCOUNT 101 FOR RE-
BILL. REIMBURSEMENT IS COMPLETE.
156 080.71255 178,373
RELOCATE FACILITIES. INSTALL 1769 FEET OF 20 INCH STEEL AND ABANDON 1759
FEET OF 20 INCH STEEL ALONG IH 635 TO ACCOMODATE TXDOT IH 635
IMPROVEMENTS PROJECT.ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES DECEMBER YES
$2,775,411.60 CREDITED IN 2021 TO
ACCOUNT 101. $165,200.53 DEBITED IN
2022 TO ACCOUNT 101 FOR REFUND
EXCESS PAYMENT. REIMBURSEMENT
IS COMPLETE.
157 080.71571 416
RELOCATE FACILITIES. INSTALL 625 FEET OF 4 INCH POLY AND ABANDON 375 FEET
OF 3 INCH POLY ALONG WEST PARK COURT TO ACCOMMODATE CONSTRUCTION
OF A MEDICAL CENTER.ALL CUSTOMERS EULESS
RELOCATION OF
FACILITIES SEPTEMBER YES
$77,753.00 CREDITED IN 2021 TO
ACCOUNT 101. $21,324.83 CREDITED
IN 2022 TO ACCOUNT 101 FOR RE-
BILL. REIMBURSEMENT IS COMPLETE.
158 080.71674 254
RELOCATE FACILITIES. INSTALL 500 FEET OF 4 INCH POLY AND ABANDON 500 FEET
OF 4 INCH POLY ALONG STREETS OF EDWARDS CHURCH. DEVELOPER INSTALLED
FACILITIES.ALL CUSTOMERS MESQUITE
RELOCATION OF
FACILITIES JUNE NO PROJECT IS NOT REIMBURSABLE
159 080.71737 25,901
RELOCATE FACILITIES. INSTALL 447 FEET OF 4 INCH POLY ALONG ESTATE LANE
AND ABANDON 422 FEET OF 3 INCH POLY TO ACCOMMODATE TXDOT PROJECT.ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES AUGUST YES
$203,421.34 CREDITED IN 2021 TO
ACCOUNT 101. $25,264.27 DEBITED IN
2022 TO ACCOUNT 101 FOR REFUND
EXCESS PAYMENT. REIMBURSEMENT
IS COMPLETE.
160 080.71755 (1,974,925)
RELOCATE FACILITIES. INSTALL 399 FEET OF 10 INCH STEEL AND 1996 FEET OF 6
INCH POLY, 159 FT OF 4 INCH POLY AND 145 FEET OF 2 INCH POLY ALONG I-35
RELOCATION AND ABANDON 403 FEET OF 10 INCH STEEL AND 2633 FEET OF POLY
TO ACCOMMODATE TXDOT IMPROVEMENT PROJECT.ALL CUSTOMERS GAINESVILLE
RELOCATION OF
FACILITIES DECEMBER YES
$1,981,606.86 CREDITED IN 2022 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
161 080.71969 (51,222)
RELOCATE FACILITIES. INSTALL TWO 6 INCH ISOLATION VALVE, 10 INCH MAINLINE
VALAVE, 80 FEET OF 16 INCH STEEL AND ABANDON 80 FEET OF 16 INCH STEEL
ALONG THE STREETS OF ARLINGTON.ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES MAY NO PROJECT IS NOT REIMBURSABLE
162 080.71978 (16,193)
RELOCATE FACILITES. INSTALL 103 FEET OF 4 INCH POLY AND ABANDON 101 FEET
OF 3 INCH POLY ALONG GALLERIA DRIVE TO ACCOMODATE UNION PACIFIC
RAILROAD EXTENSION PROJECT.ALL CUSTOMERS ARLINGTON
RELOCATION OF
FACILITIES MARCH YES
$149,352.89 CREDITED IN 2021 TO
ACCOUNT 101. $11,710.93 DEBITED IN
2021 TO ACCOUNT 101 FOR REFUND
EXCESS PAYMENT. REIMBURSEMENT
IS COMPLETE.
163 080.72074 9,047
RELOCATE FACILITIES. INSTALL 277 FEET OF 4 INCH POLY AND 419 FEET OF 6 INCH
POLY ALONG JUPITER ROAD AND KINGSLEY ROAD AND ABANDON 1327 FEET OF 8
INCH STEEL TO ACCOMMODATE TXDOT IMPROVEMENT PROJECT.ALL CUSTOMERS GARLAND
RELOCATION OF
FACILITIES DECEMBER YES
$279,828.01 CREDITED IN 2021 TO
ACCOUNT 101. $3,720.33 DEBITED IN
2022 TO ACCOUNT 101 FOR REFUND
EXCESS PAYMENT. REIMBURSEMENT
IS COMPLETE.
164 080.72248 19,590
RELOCATE FACILITIES. ABANDON 250 FEET OF 3 INCH STEEL ALONG
COMMONWEATH DRIVE TO ACCOMODATE DEVELOPMENT PROJECT.ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES JULY YES
$38,561.45 CREDITED IN 2021 TO
ACCOUNT 101. $19,616.10 DEBITED IN
2022 TO ACCOUNT 101 FOR REFUND
EXCESS PAYMENT. REIMBURSEMENT
IS COMPLETE.
165 080.72336 66,877
RELOCATE FACILITIES. INSTALL 750 OF 6 INCH POLY AND AND ABANDON 740 FEET
OF 6 INCH POLY TO ACCOMMODATE SANITARY SEWER LINE.ALL CUSTOMERS HASLET
RELOCATION OF
FACILITIES OCTOBER YES
$205,474.41 CREDITED IN 2022 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
166 080.72403 (90,073)
RELOCATE FACILITIES. INSTALL 320 FEET OF 6 INCH POLY AND ABANDON 320 FEET
OF 6 INCH STEEL TO ACCOMMODATE NEW CEFCO.ALL CUSTOMERS PALESTINE
RELOCATION OF
FACILITIES JUNE YES
$263,629.85 CREDITED IN 2021 TO
ACCOUNT 101. $65,640.38 CREDITED
IN 2022 TO ACCOUNT 101 FOR RE-
BILL. REIMBURSEMENT IS COMPLETE.
167 080.72480 (293,122)
RELOCATE FACILITIES. INSTALL 292 FEET OF 4 INCH STEEL AND ABANDON 284 FEET
OF 4 INCH STEEL ALONG LINE O29 TO ACCOMMODATE TXDOT PROJECT.ALL CUSTOMERS CRANDALL
RELOCATION OF
FACILITIES AUGUST NO
$305,539.98 CREDITED IN 2022 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
168 080.72550 (4,906)
RELOCATE FACILITIES. INSTALL 172 FEET OF 4 INCH POLY AND ABANDON 172 FEET
OF 4 INCH POLY ALONG FORD LANE TO ACCOMMODATE AAON.ALL CUSTOMERS LONGVIEW
RELOCATION OF
FACILITIES FEBRUARY YES
$165,223.54 CREDITED IN 2021 TO
ACCOUNT 101. $4,660.42 CREDITED IN
2022 TO ACCOUNT 101 FOR RE-BILL.
REIMBURSEMENT IS COMPLETE.
169 080.72811 260
RELOCATION FACILITIES: INSTALL TAP AND RISER ALONG LINE RFB IN TAYLOR
COUNTY TO ACCOMMODATE A RELOCATED MEASURING STATION.ALL CUSTOMERS TUSCOLA
RELOCATION OF
FACILITIES APRIL NO PROJECT IS NOT REIMBURSABLE
170 080.72871 (4,803)
RELOCATE FACILITIES. INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 400 FEET
OF 4 INCH POLY ALONG FREDERICK SQUARE TO ACCOMMODATE A DEVELOPER
PROJECT.ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES MARCH YES
$88,372.80 CREDITED IN 2021 TO
ACCOUNT 101. $8,709.42 CREDITED IN
2022 TO ACCOUNT 101 FOR RE-BILL.
REIMBURSEMENT IS COMPLETE.
171 080.73430 223
RELOCATE FACILITIES. INSTALL 40 FEET OF 6 INCH POLY AND ABANDON 40 FEET
OF 6 INCH POLY ALONG HICKIX ROAD.ALL CUSTOMERS ROWLETT
RELOCATION OF
FACILITIES SEPTEMBER NO PROJECT IS NOT REIMBURSABLE
172 080.73506 133
RELOCATE FACILITIES. INSTALL 512 FEET OF 4 INCH POLY AND ABANDON 515 FEET
OF 4 INCH POLY. DEVELOPER INSTALLED FACILITIES.ALL CUSTOMERS PROSPER
RELOCATION OF
FACILITIES APRIL NO PROJECT IS NOT REIMBURSABLE
MTX Relocations
Page 10 of 12
596
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED
IN GAS PLANT
IN SERVICE
REIMBURSEMENT
RECEIVED?
YES/NO
COMMENTS / ADDITIONAL
INFORMATION RELATED TO THE
AMOUNT IN COLUMN "COST"
173 080.73596 (43,324)
RELOCATE FACILITIES. INSTALL 1500 FEET OF 6 INCH STEEL AND ABANDON 900
FEET OF 6 INCH STEEL ALONG NORTH OF VICTORY CIRCLE TO ACCOMMODATE A
DEVELOPER PROJECT.ALL CUSTOMERS NORTHLAKE
RELOCATION OF
FACILITIES SEPTEMBER YES
$535,357.00 CREDITED IN 2021 TO
ACCOUNT 101. $56,273.48 CREDITED
IN 2022 TO ACCOUNT 101 FOR RE-
BILL. REIMBURSEMENT IS COMPLETE.
174 080.73673 5,757 RELOCATE FACILITIES. INSTALL 1500 FEET OF 4 INCH POLY ALONG 38TH STREET.ALL CUSTOMERS KILLEEN
RELOCATION OF
FACILITIES MARCH NO
THE COMPANY HAS EITHER
PROVIDED, PREPARED, OR WILL
PREPARE AN INVOICE TO OBTAIN
REIMBURSEMENT, WHICH WILL BE
CREDITED TO THE BOOKS AND
RECORDS OF THE COMPANY IN
FUTURE GRIP FILINGS.
175 080.74022 (97,755)
RELOCATE FACILITIES. INSTALL 370 FEET OF 4 INCH, 340 FEET OF 4 INCH POLY
ALONG GARZA STREET AND ABANDON 320 FEET OF 3 INCH STEEL, 238 FEET OF 3
INCH STEEL IN ACCORDANCE WTIH RAILROAD COMMISSION OF TEXAS RULE 8.209.ALL CUSTOMERS TUSCOLA
RELOCATION OF
FACILITIES JULY YES
$109,598.10 CREDITED IN 2021 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
176 080.74505 35,619
RELOCATE FACILITIES. INSTALL 50 FEET OF 4 INCH POLY AND ABANDON 50 FEET
OF 4 INCH POLY ALONG GREENVILLE AVENUE TO ACCOMMODATE DEVELOPER
INSTALLED FACILITY.ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES APRIL YES
$57,606.10 CREDITED IN 2021 TO
ACCOUNT 106. REIMBURSEMENT IS
COMPLETE.
177 080.74807 13,499
RELOCATE FACILITIES. INSTALL 22 FEET OF 6 INCH POLY ALONG LAKEWOOD DRIVE
AND ABANDON 20 FEET OF 6 INCH POLY TO ACCOMODATE DEVELOPER FACILITIES.ALL CUSTOMERS BURLESON
RELOCATION OF
FACILITIES MARCH YES
$20,991.01 CREDITED IN 2021 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
178 080.75066 807
RELOCATE FACILITIES. INSTALL 131 FEET OF 2 INCH POLY ALONG WESTBOROUGH
LANE AND ABANDON 125 FEET OF 2 INCH POLY TO ACCOMODATE DEVELOPER
FACILITIES.ALL CUSTOMERS LEANDER
RELOCATION OF
FACILITIES JUNE NO PROJECT IS NOT REIMBURSABLE
179 080.75461 (57,515)
RELOCATE FACILITIES. INSTALL 180 FEET OF 4 INCH POLY AND ABANDON 253 FEET
OF 2 INCH STEEL ALONG 6TH STREET TO ACCOMMODATE NEW HOTEL.ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES AUGUST YES
$60,453.74 CREDITED IN 2022 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
180 080.76794 42,881
RELOCATE FACILITIES. INSTALL 330 FEET OF 6 INCH POLY ALONG LIVE OAK STREET
IN COMMERCE AND ABANDON 330 FEET OF 6 INCH STEEL. DEVELOPER INSTALLED
FACILITIES.ALL CUSTOMERS COMMERCE
RELOCATION OF
FACILITIES DECEMBER NO PROJECT IS NOT REIMBURSABLE
181 080.76862 138,847
INSTALL 200 FEET OF 12 INCH STEEL AND ABANDON 200 FEET OF 12 INCH STEEL
ALONG FM 1417 IN SHERMAN, GRAYSON COUNTY.ALL CUSTOMERS SHERMAN
RELOCATION OF
FACILITIES DECEMBER NO
$255,291.44 CREDITED IN 2022 TO
ACCOUNT 1010. THE COMPANY HAS
EITHER PROVIDED, PREPARED, OR
WILL PREPARE AN INVOICE TO
OBTAIN REIMBURSEMENT, WHICH
WILL BE CREDITED TO THE BOOKS
AND RECORDS OF THE COMPANY IN
FUTURE GRIP FILINGS.
182 080.77669 309,297
INSTALL 184 FEET OF 12 INCH STEEL AND ABANDON 132 FEET OF 8 INCH STEEL
ALONG THE STREETS OF UNIVERSITY OF TEXAS-DALLAS, RICHARDSON, DALLAS
COUNTY.ALL CUSTOMERS RICHARDSON
RELOCATION OF
FACILITIES DECEMBER NO
$157,019.33 CREDITED IN 2022 TO
ACCOUNT 1010. THE COMPANY HAS
EITHER PROVIDED, PREPARED, OR
WILL PREPARE AN INVOICE TO
OBTAIN REIMBURSEMENT, WHICH
WILL BE CREDITED TO THE BOOKS
AND RECORDS OF THE COMPANY IN
FUTURE GRIP FILINGS.
183 080.77749 108,392
RELOCATE FACILITIES. INSTALL 760 FEET OF 6 INCH POLY ALONG STATE HIGHWAY
6 IN COLLEGE STATION. DEVELOPER INSTALLED FACILITIES.ALL CUSTOMERS COLLEGE STATION
RELOCATION OF
FACILITIES DECEMBER NO
THE COMPANY HAS EITHER
PROVIDED, PREPARED, OR WILL
PREPARE AN INVOICE TO OBTAIN
REIMBURSEMENT, WHICH WILL BE
CREDITED TO THE BOOKS AND
RECORDS OF THE COMPANY IN
FUTURE GRIP FILINGS.
184 080.77786 (21,055)
INSTALL 150 FEET OF 2 INCH POLY AND ABANDON 150 FEET OF 2 INCH STEEL
ALONG FM 1033 NORTH OF US 287 IN TXDOT ROAD RIGHT OF WAY IN KIRKLAND,
CHILDRESS COUNTY.ALL CUSTOMERS KIRKLAND
RELOCATION OF
FACILITIES DECEMBER YES
$52,201.91 CREDITED IN 2022 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
185 080.77961 3,057
RELOCATE FACILITIES. INSTALL 35 FEET OF 4 INCH POLY ALONG THE STREETS OF
BRIDGEPORT.ALL CUSTOMERS BRIDGEPORT
RELOCATION OF
FACILITIES OCTOBER YES
$13,417.79 CREDITED IN 2022 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
186 080.77972 (5,816)
RELOCATE FACILITIES. INSTALL 680 FEET OF 4 INCH POLY ALONG SOUTH OAKES
STREET IN SAN ANGELO AND ABANDON 535 FEET OF 4 INCH POLY AND 100 FEET OF
4 INCH STEEL.ALL CUSTOMERS SAN ANGELO
RELOCATION OF
FACILITIES DECEMBER YES
$135,443.94 CREDITED IN 2022 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
187 080.78001 244,501
RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG CINNABAR AND
SYMPHONY IN DALLAS AND ABANDON 100 FEET OF 4 INCH POLY.ALL CUSTOMERS DALLAS
RELOCATION OF
FACILITIES DECEMBER NO PROJECT IS NOT REIMBURSABLE
188 080.78026 39,645
RELOCATE FACILITIES. INSTALL 384 FEET OF 2 INCH POLY ALONG MORNING GLORY
DRIVE IN FREDERICKSBURG.ALL CUSTOMERS FREDERICKSBURG
RELOCATION OF
FACILITIES OCTOBER NO PROJECT IS NOT REIMBURSABLE
189 080.78104 24,080
RELOCATE FACILITIES. INSTALL 755 FEET OF 4 INCH POLY ALONG NORTH
COLLEGE AVENUE AND ABANDON 300 FEET OF 4 INCH STEEL AND 300 FEET OF 2
INCH POLY IN SNYDER, SCURRY COUNTY.ALL CUSTOMERS SNYDER
RELOCATION OF
FACILITIES DECEMBER NO
$84,581.36 CREDITED IN 2022 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
190 080.78131 (12,782)
RELOCATE FACILITIES. INSTALL 160 FEET OF 4 INCH POLY ALONG WOODARD
AVENUE IN CLEBURNE AND ABANDON 160 FEET OF 4 INCH POLY.ALL CUSTOMERS CLEBURNE
RELOCATION OF
FACILITIES DECEMBER NO
$56,921.78 CREDITED IN 2022 TO
ACCOUNT 1010. THE COMPANY HAS
EITHER PROVIDED, PREPARED, OR
WILL PREPARE AN INVOICE TO
OBTAIN REIMBURSEMENT, WHICH
WILL BE CREDITED TO THE BOOKS
AND RECORDS OF THE COMPANY IN
FUTURE GRIP FILINGS.
MTX Relocations
Page 11 of 12
597
Item 10.
ATMOS ENERGY CORP., MID‐TEX DIVISION
PROJECT RELOCATION REPORT FOR CALENDAR YEAR 2022
LINE NO. PROJECT NO. COST DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CY 2022
CUSTOMERS
BENEFITED LOCATION
PURPOSE OF
PROJECT
DATE PLACED
IN GAS PLANT
IN SERVICE
REIMBURSEMENT
RECEIVED?
YES/NO
COMMENTS / ADDITIONAL
INFORMATION RELATED TO THE
AMOUNT IN COLUMN "COST"
191 080.78205 (12,670)
RELOCATE FACILITIES. INSTALL 1,550 FEET OF 2 INCH POLY ALONG BOURLAND
LANE IN WICHITA FALLS.ALL CUSTOMERS WICHITA FALLS
RELOCATION OF
FACILITIES NOVEMBER YES
$128,212.68 CREDITED IN 2022 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
192 080.78226 5,278
RELOCATE FACILITIES. INSTALL 7 .75 INCH SERVICE LINES ALONG CROSS BEND
ROAD AND KNOB HILL IN PLANO AND ABANON 7 .75 INCH SERVICE LINES TO
ACCOMMODATE THE CITY OF PLANO'S INSTALLATION OF A SCREENING WALL.ALL CUSTOMERS PLANO
RELOCATION OF
FACILITIES DECEMBER YES
$28,718.57 CREDITED IN 2022 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
193 080.78247 (1,715)
RELOCATE FACILITIES. INSTALL 25 FEET OF 6 INCH POLY ALONG SOUTH MAIN
STREET IN MANSFIELD AND ABANDON 15 FEET OF 6 INCH POLY.ALL CUSTOMERS MANSFIELD
RELOCATION OF
FACILITIES DECEMBER YES
$40,006.58 CREDITED IN 2022 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
194 080.78384 (331,795)
INSTALL 7,400 FEET OF 4 INCH AND 50 FEET OF 2 INCH POLY AND DISTRICT
REGULATOR STATION AND ABANDON 13 FEET OF 4 INCH AND 8 FEET OF 2 INCH
POLY ALONG THE STREETS OF WICHITA FALLS, WICHITA COUNTY.ALL CUSTOMERS WICHITA FALLS
RELOCATION OF
FACILITIES DECEMBER NO
$1,173,782.00 CREDITED IN 2022 TO
ACCOUNT 1010. THE COMPANY HAS
EITHER PROVIDED, PREPARED, OR
WILL PREPARE AN INVOICE TO
OBTAIN REIMBURSEMENT, WHICH
WILL BE CREDITED TO THE BOOKS
AND RECORDS OF THE COMPANY IN
FUTURE GRIP FILINGS.
195 080.78386 3,112
RELOCATE FACILITIES. INSTALL 1,200 FEET OF 4 INCH POLY ALONG FM 548 IN
FORNEY AND ABANDON 1,400 FEET OF 4 INCH POLY. DEVELOPER INSTALLED
FACILITIES.ALL CUSTOMERS FORNEY
RELOCATION OF
FACILITIES DECEMBER NO PROJECT IS NOT REIMBURSABLE
196 080.78399 7,376
INSTALL 2,100 FEET OF 4 INCH POLY AND ABANDON 345 FEET OF 4 INCH POLY
ALONG THE STREETS OF ABILENE, TAYLOR COUNTY.ALL CUSTOMERS ABILENE
RELOCATION OF
FACILITIES DECEMBER NO
$59,161.00 CREDITED IN 2022 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
197 080.78415 (7,158)
RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH POLY ALONG CABELA DRIVE IN
FORT WORTH AND ABANDON 50 FEET OF 6 INCH POLY TO ACCOMMODATE ONCOR
MANHOLE INSTALLATION.ALL CUSTOMERS FORT WORTH
RELOCATION OF
FACILITIES DECEMBER YES
$63,445.75 CREDITED IN 2022 TO
ACCOUNT 101. REIMBURSEMENT IS
COMPLETE.
198 080.78416 (39,086)
RELOCATE FACILITIES. INSTALL 100 FEET OF 8 INCH POLY ALONG WASHINGTON
STREET AND COLUMBUS AVENUE IN WACO, MCLENNAN COUNTY AND ABANDON
100 FEET OF 8 INCH STEEL.ALL CUSTOMERS WACO
RELOCATION OF
FACILITIES DECEMBER NO
$251,185.70 CREDITED IN 2022 TO
ACCOUNT 1010. THE COMPANY HAS
EITHER PROVIDED, PREPARED, OR
WILL PREPARE AN INVOICE TO
OBTAIN REIMBURSEMENT, WHICH
WILL BE CREDITED TO THE BOOKS
AND RECORDS OF THE COMPANY IN
FUTURE GRIP FILINGS.
199 080.78526 (71,416)
RELOCATE FACILITIES. INSTALL 700 FEET OF 4 INCH POLY ALONG PARK STREET
AND CORSICANA HIGHWAY IN HILLSBORO AND ABANDON 335 FEET OF 3 INCH
STEEL.ALL CUSTOMERS HILLSBORO
RELOCATION OF
FACILITIES DECEMBER NO
$198,426.50 CREDITED IN 2022 TO
ACCOUNT 1010. THE COMPANY HAS
EITHER PROVIDED, PREPARED, OR
WILL PREPARE AN INVOICE TO
OBTAIN REIMBURSEMENT, WHICH
WILL BE CREDITED TO THE BOOKS
AND RECORDS OF THE COMPANY IN
FUTURE GRIP FILINGS.
200 080.78586 23,087
RELOCATE FACILITIES. INSTALL 135 FEET OF 2 INCH POLY ALONG HIGHWAY 82 AND
TEXOMA PARKWAY IN SHERMAN AND ABANDON 2 INCH STEEL RISER AND DOUBLE
METER LOOP.ALL CUSTOMERS SHERMAN
RELOCATION OF
FACILITIES DECEMBER NO PROJECT IS NOT REIMBURSABLE
201 080.78595 7,583
RELOCATE FACILITIES. INSTALL 275 FEET OF 2 INCH POLY ALONG ENTERPRISE
WAY IN GREENVILLE AND ABANDON 17 FEET OF 2 INCH POLY. DEVELOPER
INSTALLED FACILITIES.ALL CUSTOMERS GREENVILLE
RELOCATION OF
FACILITIES DECEMBER NO PROJECT IS NOT REIMBURSABLE
202 080.78983 82,252
INSTALL 418 FEET OF 2 INCH POLY AND ABANDON 368 FEET OF 2 INCH STEEL AND
50 FEET OF 2 INCH POLY IN ROCHESTER, HASKELL COUNTY.ALL CUSTOMERS ROCHESTER
RELOCATION OF
FACILITIES DECEMBER NO PROJECT IS NOT REIMBURSABLE
203 080.79000 252,247
RELOCATE FACILITIES. INSTALL 500 FEET OF 8 INCH POLY TO BE ROAD RIGHT OF
WAY AT WINDING MEADOWS AND CANYON MAPLE ROAD AND ABANDON 456 FEET
OF 8 INCH POLY IN NORTHLAKE, DENTON COUNTY.ALL CUSTOMERS NORTHLAKE
RELOCATION OF
FACILITIES DECEMBER NO PROJECT IS NOT REIMBURSABLE
204 080.79288 846
INSTALL 235 FEET OF 4 INCH POLY AND ABANDON 235 FEET OF 4 INCH POLY ALONG
THE STREETS OF GREENWAY SUBDIVISION IN CELINA, COLLIN COUNTY.ALL CUSTOMERS CELINA
RELOCATION OF
FACILITIES DECEMBER NO PROJECT IS NOT REIMBURSABLE
MTX Relocations
Page 12 of 12
598
Item 10.
599
Item 10.
600
Item 10.
601
Item 10.