06/24/2002-CC-Agenda Packet-SpecialAGENDA
MONDAY, JUNE 24, 2002
7:00 P.M.
201 BOLIVAR
1. Call Meeting to Order, Invocation, Pledge of Allegiance.
2. Consider and Possible Action on Final Plat for Eagle Park, Phase II. Property is
Located on F.M. 455.
3. Consider and Possible Action on the Preliminary Plat for Quail Run, Being 380
Residential Lots and 2 Open Spaces out of 82.43 Acres Located off of Cowling Road.
4. Consider and Possible Action on the Preliminary Plat for Fallmeadows, Phase II &III.
Property is Located on F.M. 455 and Union Hill, in the E.T.J.
5.
Consider and Possible Action on the Final Plat for Fallmeadows, Phase II &III.
Property is Located on F.M. 455 and Union Hill, in the E.T.J.
Adjourn.
sake Chavez, City
Date &Time Posted
This facility is wheelchair accessible and accessible parking spaces are available. Requests for
accommodations or interpretive services must be made 48 hours prior to this meeting. Please contact the
City Secretary's office at (940) 458-7930 for further information.
June 20, 2002
To: Honorable Mayor, City Council, and Planning and Zoning
Fr: Rosalie Chavez, City Secretary/Assistant City Manager
Re: Eagle Park, Phase II
Attached is the information regarding this request. Please review the plat that was sent with your
last packet for this item.
MARK T. UWENS, P.E.
GENERAL CIVIL CONSULTING ENGINEER
Mr. Jack Smith
City of Sanger
P.O. Box 1729
Sanger, Texas 76266
Re: Eagle Park, Phase II —Final Plat
Lots 14, Block A
Final Plat Review
Dear Mr. Smith:
June 1022002
Per your request I have reviewed a Final Plat as prepared and submitted by Isbell Engineering
Group, Inc. for the project referenced above. Comments are referenced.by the Subdivision
Ordinance of the City of Sanger, Texas as adopted September 21, 1987, Zoning Ordinance
adopted August 3, 1987, and Ordinance No. 05-06-01. My review comments are as follows:
In general the Final Plat, Preliminary Utility Layout, and Preliminary DrainageStudy
comply with City ordinances and with standard engineering practices and principles.
Pursuant to Section 19.3.d of the zoning ordinance a solid masonry or wood wall having a
minimum height of six (6) feet above the average grade of the residential property shall be
constructed adjacent to rear property line adjacent proposed Phase II Serendipity Place
residential subdivision.
Detailed site grading plans and utility plans will be required for each lot within the subdivision
prior to approval of a building permit.
If you have any questions or need any further information, please call me at (940) 391-4845.
Sinc, ely;
T t 6004k
Mark T. Owens, P.E.
General Civil Consulting Engineer
Cc: Mike Kern —Isbell Engineering Group, Inc.
John Porter —PAC Group, LTD
MARK I * OWENS, P.E.
GENERAL CIVIL CONSULTING ENGINEER
Mr, Jack Smith
City of Sanger
P.O. Box 1729
Sanger, Texas 76266
Re: Eagle Park, Phase II —Final Plat
Lots 1.7, Block A
Final Plat Review
Dear Mr. Smith:
May 30, 2002
Per your request I have reviewed a Final Plat as prepared and submitted by Isbell Engineering Group, Inc.
for the project referenced above. Comments are referenced by the Subdivision Ordinance of the City of
Sanger, Texas as adopted September 21, 1987, Zoning Ordinance adopted August 3, 1987, and Ordinance
No. 05•06-01. My review comments are as follows.
General
1. The property is generally located at the southeast comer of the intersection of FM 455 and North
Keaton Road within the City of Sanger city limits.
Final Plat
1. The arrow pointing ro the additional 15 feet of ROW to be dedicated is pointing to the wrong
lines. This comment was identified in my last letter but was not addressed.
2. Pursuant to Item 4.04.P of the Subdivision Ordinance, construction plans should show and
evaluate all existing and proposed drainage facilities. This comment was identified in my last
letter but was not addressed completely. The existing driveway culvert for Lot 1 and the culvert
crossing Keaton Road need to be evaluated.
3. According to the ditch profile on Sheet 2 the ditch is going to be re -graded. The stationing of the
re -graded ditch needs to be shown. The re -graded portion of the ditch appears to require that the
existing driveway culvert in front of Lot 1 be lowered. The lowered culvert is not shown in the
profile. I would suggest that a new culvert be placed in front of Lot 1 with standard TxDOT
safety end treatments be constructed in accordance with the drainage evaluation.
If you have any questions or need any further information, please call me at (940) 3914845.
General Civil Consulting Engineer
Cc: Mike Kern —Isbell Engineering Group, Inc.
X
"'a
MARK T. OWENS, P.E.
Ge.N$RAL CIVIL CONSULTING Er�GINcER
May 21, 2002
Mr. Jack Smith
City of Sanger
P.O. Box 1729
Sanger, Texas 76266
Re: Eagle Park, Phase II —Final Plat
Lots 1-7, Block A
Final Plat Review
Dear Mr. Smith:
Per your request I have reviewed a Final Plat as prepared and submitted by Isbell Engineering
Group, Inc. for the project referenced above. Comments are referenced by the Subdivision
Ordinance of the City of Sanger, Texas as adopted September 21, 1987, Zoning Ordinance
adopted August 3, 1987, and Ordinance No. OS-06-01. My review comments are as follows:
General
1. The property is generally located at the southeast, corner of the intersection of FM 455
and North Keaton Road within the City of Sanger city limits.
Final Plat
�1: The typical setback detail shown applies to interior lots only and does not apply to Lots 1
& 7. The detail should be labeled as an interior lot detail only.
2. The arrows pointing to the additional 15 feet of ROW to be dedicated are pointing to the
wrong lines.
3. The note stating that a 6' fence will be required has several misspelled words that should
be corrected.
4. Pursuant to Item 4.04.I of the Subdivision Ordinance a Lot Grading Plan should be
provided. The typical lot grading plan shown does not show sufficient detail to determine
if drainage from one lot is adversely impacting adjacent lots.
5. Pursuant to Item 4.04.P of the Subdivision Ordinance construction plans should show and
evaluate all existing and proposed drainage facilities such as ditch improvements along
FM 455 and all proposed drainage improvements as identified in a detailed drainage
study.
MARK `7`. �WEA1S, P.E.
GENERAL CIVIL GQNSULTING ENGINEER
6. To provide for future development to the north of FM 455 along Keaton Road, the invert
of the manhole located a Station 1+59.71 should be lowered as much as possible while
maintaining a minimum flow velocity of 2 fps.
If you have any questions or need any further information, please call me at (940) 391-4845.
Sincerely;
Mark T. Owens,P.E.
General Civil Consulting Engineer
Cc: Mike Kern —Isbell Engineering Group, Inc.
j
rn:iirh.:i t.L•.!c rr:
MARK -i'. UWENS, P.E.
GENERAL CIVIL CONSULTING ENGINEER
Apri125, 2002
NIr. Jack Smith
City of Sanger
P.O. Box 1729
Sanger, Texas 76266
Re: Eagle Park, Phase II —Final Plat
Lots 1=7, Block A
2°d Review
Deaz Mr. Smith:
Per your request I have reviewed a Final Plat as prepared and submitted by Isbell Engineering
Group, Inc. for the project referenced above. Comments are referenced by the Subdivision
Ordinance of the City of Sanger, Texas as adopted September 21, 1987, Zoning Ordinance
adopted August 3, 1987, and Ordinance No. 05-06-01. My review comments are as follows:
General
1. All comments received from Public Works, Fire Department and Code Enforcement
should also be addressed prior to approval of the Final Plat,
2. The property is generally located at the southeast corner of the intersection of FM 455
and North Keaton Road within the City of Sanger city limits.
Final Plat
1. The typical setback detail shown applies to interior lots only and does not apply to Lot 1.
2. Pursuant to Section 19.3.d of the zoning ordinance a solid masonry or wood wall having
a minimum height of six (6) feet above the average grade of the residential property shall
be constructed adjacent to rear property line adjacent proposed Phase II Serendipity Place
residential subdivision. The wall for Eagle Park Phase 1 and Eagle Park Phase 2 will
need to be constructed prior to approval of Eagle Park Phase 2 final plat.
3. Pursuant to Item 4.04.I of the Subdivision Ordinance a Lot Grading Plan should be
provided. The typical lot grading plan shown is not sufficient for determining impact on
adjacent properties.
4. Pursuant to Item 4.04.P of the Subdivision Ordinance, construction plans should be
provided showing ditch improvements along FM 455 and all proposed drainage
improvements as identified in a detailed drainage study. The capacities of the existing
MARK I * UWENS, Ps
GENERAL CIVIL CONSULTING ENGINEER
culvert in front of Lot 1 and the culvert crossing Keaton Road need to be evaluated and
potentially upgraded.
5. Pursuant to Item 4.04.F of die Subdivision Ordinance accurate location, material and
approximate size of all monuments need to be shown in accordance with section 5.07
(A) of the City's Subdivision Ordinance.
If you have any questions or need any further information, please call me at (940) 3914845.
Mark T. Owens, P.E.
General Civil Consulting Engineer
Cc: Mike Kern —Isbell Engineering Group, Inc.
-o�dGER.TiC 7v2:?si
MARK I OWENS, P.E.
GENERAL CIVIL CONSULTING ENGINEER
Apni 68 2002
Mr. Jack Smith
City of Sanger
P.O. Box 1729
Sanger, Texas 76266
Re: Eagle Park, Phase II — Final Plat
Lots 1-7, Block A
1 st Review
Dear Mr. Smith:
Per your request I have reviewed a Final Plat as prepared and submitted by Isbell Engineering
Group, Inc. for the project referenced above. Comments are referenced by the Subdivision
Ordinance of the City of Sanger, Texas as adopted September 21, 1987, Zoning Ordinance
adopted August 3, 1987, and -Ordinance No. 05-06=01. My review comments are as follows:
General
1. All comments received from Public Works, Fire Department and Code Enforcement
should also be addressed prior to approval of the Final Plat.
2. The property is generally located at the southeast corner of the intersection of FM 455
and North Keaton Road within the City of Sanger city limits.
Final Plat
1. The typical setback detail shown applies to interior lots only and does not apply to lots
adjacent to streets on two sides. The detail should be labeled as an interior lot detail. The
45' side yard building line shown for Lot 1 exceeds City requirements.
2. Pursuant to Section 19.3.d of the zoning ordinance a solid masonry or wood wall having
a minimum height of six (6) feet above the average grade of the residential property shall
be constructed adjacent to rear property line adjacent proposed Phase H Serendipity Place
residential subdivision.
3. Pursuant to Item 4.04.I of the Subdivision Ordinance a Lot Grading Plan should be
provided.
4. Pursuant to Item 4.04.P of the Subdivision Ordinance construction plans should be
provided showing plan and profile of proposed sewers, proposed water lines, ditch
improvements along FM 455, and all proposed drainage improvements as identified in a
detailed drainage study.
All a
Jtxiinr, a •�z.�.4• crt
MARK T. UWENS, P.E.
GENERAL CIVIL CONSULTING ENGINEER
5. For Lots 7, 2 and 1 it is not clear as to what are building lines and what are public utility
easement lines. This needs to be clarified.
6. Pursuant to Item 4.04.F of the Subdivision Ordinance accurate location, material and
approximate size of all monuments need to be shown in accordance with section 5.07 (A)
of the City's Subdivision Ordinance.
If you have any questions or need any further information, please call me at (940) 391-4845.
Mark T. Owens, P.E.
General Civil Consulting Engineer
Cc: Mike Kern —Isbell Engineering Group, Inc.
June 20, 2002
To: Honorable Mayor, City Council, and Planning and Zoning
Fr: Rosalie Chavez, City Secretary/Assistant City Manager
Re: Quail Run
Attached is the information regarding this request. Please review the plat that was sent with your
last packet for this item.
GI"h{ERAL CtY?L GQh15ULT{hlG EPaGINcER
June 10, 2002
Mr. Jack Smith
City of Sanger
P.O. Box 1729
Sanger, Texas 76266
Re: Quail Run —Preliminary Plat, Preliminary Utility Layout, and Preliminary Drainage Study
380 Residential Lots
Sanger, Texas
Final Review
Deaz Mr. Smith:
Per your request I have completed a final review of a Preliminary Plat, Preliminary Utility
Layout, and Preliminary Drainage Study as prepared and submitted by Crannel,.Crannel &
Martin Engineering for the project referenced above. My review comments are as follows:
In accordance with the current City's Park Ordinance a total of 7.60 acres of park space is
required. The plat shows a total of 9.40 acres if the City allows the developer to utilize detention
pond area as park space. This would be acceptable under the condition that the detention ponds is
designed to minimize water depth and facilitate access to adjacent park space.
In general the Preliminary Plat, Preliminary Utility Layout, and Preliminary Drainage Study
complies with City ordinances and with standard engineering practices and principles.
Before approval of the final plat for any phase of the project by Town Council, I would
recommend that an evaluation of the capacity of lift station, forcemain and existing downstream
sewer be evaluated relative to the potential impacts this project will have and to insure capacity
to service this subdivision.
If you have any questions or need any further information, please call me at (940) 391-4845.
Sincerely;
f/
ark T. Owens, P.E.
General Civil Consulting Engineer
Cc: Jeff Crannel — Crannel, Crannel &Martin Engineering
.��?. ,:.:x ,,��
:r::....� . tratu�l:::;c•:
Crannell; Crannell & Martln Corp.
9127 KING ARTHUM DRIVE • DALLAS, TEXAS 75247
(214) 630-5200 • FAX (214) 63M110
June 6, 2002
Mr. Mark Owens, P.E.
City Engineer
City of Sanger
Hand delivery to City of Sanger
ivSr. Jack Lewis, City Manager
City of Sanger
P.O. Box 1729
Sanger, Texas 76266
Ref: Quail Run Addition
Preliminary Plat
I" Review
Dear Mark,
Our office received your comments dated May 29, 2002 on June 4, 2002. We revised the
drawings as follows:
General
1. No changes required
2. IVTo changes required
Preliminary Piat
1. No changes required.
2. Our detention pond is designed for 3' of water depth. There is a 1.3' freeboard
from the proposed 100 year water surface elevation to the top of spillway. We
could reduce or increase the freeboard if necessary.
3. Lot 19, Block C was adjusted to be 60' wide.
4. We have located the water lines approximately on the drawing and dimensioned
to the property line. We will need to excavate and exactly locate the lines during
final engineering plan preparation. We will reduce the 30' wide easement once v
the lines are visually located.
�. The requested note was added to the plan.
6. The heavy dashed line on Lot 29, Block N has been removed. A drainage line
into the detention pond is proposed in this location.
7. Utility easements are now shown all on one lot. Some lot widths were adjusted to
account for the loss of side yard.
0
Mr. Mark Owens
IVIr. Jack Lewis
June 6, 2002
Page Two
Preliminary Utility Layout
l . We will prepare a study on the existing sanitary sewer lift station. We would
prefer to make this study at the time of final engineering plan preparation. The
developer will agree to upgrade the existing lift station, upgrade the existing force
main if necessary. The developer will also agree to construct a lift station within
this development and, if possible, extend the force main to'the east under the
railroad track thereby bypassing the existing lift station.
2. �V ater line dimensioned to the property line as measured from above ground
evidence.
Preliminary Drainage Plan
1. Line weights adjusted to provide clarity. Phase line removed from the plan.
2. Offsite drainage area map revised to show USGS contours.
3. Drainage table on the plan shows each drainage subarea, time of concentration,
Q100, etc. The pre -developed flow as compared to the post -developed flow is
shown on the attached "Detention Pond Design" sheet.
4. Detention pond sizing information shown on the attached "Detention Pond
Design" sheet.
The revised drativings should address ali of your comments. Please review and contact
•this office with any questions or other revisions. We would request that the Preliminary
•__Plat be placed on the next P&Z agenda.
Sincerely,
���� L
Jeff D. Crannell, P.E.
Pres., Crannell Engineering
DETENTION POND DESIGN (100yr.Storm)
PRESENT CONDITIONS
C
0.35
C1XA
1.00
i 100
7.60
Tc
20,00
Area (ac) 1
68,00
Q100
1 180,88
FUTURE CONDITIONS
C
0,50
C1XA
1,00
i 100
7.60
Tc
15,00
Area (ac)
80.40
Q 100
305.52
STORM DURATIONS
Minutes
1100
Q100 cfs
20
7.60
305.52
30
6.00
241.20
40
5,20
209,04
50
4,60
184,92
60
4,20
168.84
70
3.80
152.76
80
3,50
140.70
90
3.20
128,64
MAXIMUM STORAGE
15 min,,Storm
Inflow
15
305.52
60
=
274,968.00
CF
Outflow
0.5
30
180.88
60
=
162.792.00
CF
Storage
=
112,176.00
CF
20 min. Storm
Inflow
20
305,52
60
=
366,624,00
CF
Outflow
0.5
35
180,88
60
=
189,924.00
CF
Storage
=
176,700.00
CF
30 min. Storm
Inflow
30
241.20
601
4340160.00
CF
Outflow
0.5
45
180,88
60
=
244,188.00
CF
Storage
=
189,972.00
CF
40 min. Storm
Inflow
40
209,04
60
=
501,696.00
CF
Outflow
0.5
55
180,88
60
=
2981452,00
CF
Storage
=
203,244.00
CF
50 min. Storm
Inflow
501
184.92
60
=
5541760.00
CF
Outflow
0.5
65
180,88
60
=
352,716,00
CF
Storage
=
202,044.00
CF
60 min. Storm
Inflow
60
168,84
60
=
607,824,00
CF
Outflow
0.5
75
180,88
60
=
406,980,00
CF
Storage
=
200,844.00
CF
70 min. Storm
Inflow
701
152,76
60
=
641,592.00
CF
Outflow
0051
85
180,88
60
=
461,244.00
CF
Storage
=
180,348.00
CF
80 min. Storm
Inflow
80
140,70
60
=
675,360.00
CF
Outflow
0.5
95
180.88
60
=
515,508.00
CF
Storage
=
159,852,00
CF
90 min. Storm
Inflow
90
128.64
60
=
694,656.00
CF
Outflow
0.5
105
180.88
60
=
569,772.00
CF
IStorage
=
124,884.00
CF
MARK I. UWE S, P.E.
GENERAL CIVIL CONSULTING ENGINEER
May 29, 2002
Mr. Jack Smith
City of Sanger
P.O. Box 1729
Sanger, Texas 76266
Re: Quail Run —Preliminary Plat
380 Residential Lots
Sanger, Texas
1 S` Review
Dear Mr. Smith:
Per your request I have completed a first review of a Preliminary Plat, Preliminary Utility
Layout, and Preliminary Drainage Study as prepared and submitted by Crannel, Crannel &
Martin Engineering for the project referenced above. As you may recall a preliminary plat with
the same name was previously submitted and brought before council by a different devloper for
the same piece of property. The previous plat was never approved be cause the developer
withdrew it because the City was not going to grant a variance for 5' sideyard setbacks. My
review comments are as follows:
General
1. It is my understanding that the original zoning classification for this property before the
current zoning ordinance was adopted was SF-3 or 6,000 square foot lots and that after
the new ordinance was adopted this property retained a 6,000 square foot lot zoning
designation which equates to the current zoning classification of SF-8 with a minimum
lot area of 6000 square feet. Consequently the lot sizes shown in this plat are in
conformance with the ordinance.
2. In accordance with the current City's Park Ordinance a total of 7.60 acres of park spac is
required. The plat shows a total of 9.40 acres if the City allows the developer to utilize
detention pond area as park space under the condition that the detention ponds is
designed to minimize water depth and facilitate access to adjacent park space.
Preliminary Plat
1. Contrary to the previous plat 8' sideyazd setbacks are provided.
2. The drainage plan indicates that the detention pond is a little over 7 feet contrary to what
is shown on the plat.
IM!
MARK A* OWENS, P.E.
GENERAL CIVIL CONSULTING ENGINEER
3. The frontage at the building line should be a minimum of 60 feet. Lot 19 Block C appears
not to meet this requirement.
4. A 30-foot permanent easement is shown along the north side of Block A. I realize that
there are two (2) existing water lines (12" Upper Trinity feed line and 12" city line)
located somewhere close to or within the proposed easement. The plat should show the
location of these two (2) lines to verify that the proposed easement will accommodate
future maintenance of these lines. A 30-foot easement may or may not be required.
5. A note should be placed on the plat stating that the 20' ingress/egress easement will be
abandoned when Quail Crossing and Primrose Drives are constructed.
6. There is heavy dashed line along the south side of Lot 29 Block N that has not been
defined and which needs to be defined.
7. Three 1 S-foot utility easements are shown crossing Block G. Utility easements cannot be
split onto two lots and should be contained entirely within one lot. Apparently these
easement are to be used for drainage purposes.
Preliminary Utility Layout
1. Before approval of the preliminary plat by Town Council, I would recommend that an
evaluation of the capacity of lift station, forcemain and existing downstream sewer be
evaluated relative to the potential impacts this project will have and to insure capacity to
service this subdivision. I see no problem sending the plat to planning and zoning for
their review but prior to placing this plat on the Town Council agenda, I would require
that the impact study be completed per Eddy's and my satisfaction.
2. As prevously_stated_the 12" waterlines_should_be_accurately shown.%There----
dimension shown but it is diflicult to determine what the dimension is referring to.
Preliminary Drainage Study
1. It hard to differentiate between phase lines and drainage area delineation lines. It help my
evaluation if this could be clarified.
2. An offsite drainage area map is shown. The offsite drainage area should be shown to
scale at a much larger scale than shown. It should also show at least USGS contour
intervals with drainage area delineations to assist in evaluating the drainage calculations.
3. A table showing drainage calculations is provided. It should show the time of
concentration utilized in the calculations. It should also show a comparison of pre -
development and post development stormwater flow projections.
MARK I CIWENS, P.E.
3ENERAL CIVIL CONSULTING ENGINEER
4. All calculations should be shown for sizing the proposed detention pond. A Q in and Q
out are shown but not how the flows were derived.
If you have any questions or need any further information, please call me at (940) 391-4845.
Sincerely;
Mark T. Owens, P.E.
General Civil Consulting Engineer
Cc: Jeff Crannel — Crannel, Crannel & Martin Engineering
S•'<'
! • 'tom =:J
:CbI^
.>
June 20, 2002
To: Honorable Mayor, City Council, and Planning and Zoning
Fr: Rosalie Chavez, City Secretary/Assistant City Manager
Re: Fallmeadows
Attached is the information regarding this plat. The Engineer has indicated the plat conforms with
all City ordinances. This is in our E.T.J. A copy of both the Preliminary and Final Plat are in with
your packet.
1) JAY
June 111 2002
Mr. Jack Smith
City of Sanger
P.O. Box 1729
Sanger, Texas 76266
Re: Fallmeadow Phase II &III —Preliminary Plat & Coristntction Details
37 Residential Lots
Sanger ETJ
Final Review
Dear Mr. Smith:
Per your request I have finished a final review of the Preliminary Plat and Construction Details
as prepared and submitted by Isbell Engineering Group, Inc. for the project referenced above.
Comments are referenced by the Subdivision Ordinance of the City of Sanger, Texas as adopted
September 2 F 1987, Zoning Ordinance adopted August 3, 1987, and Ordinance No, 05-06-01.
My review comments are as follows:
General
1. The property is generally located north of FM 455 and west of Union Hill Road in the
eastern portion of the City's ETJ.
Preliminary Plat, Final Plat and Construction Details
1. In general the Preliminary Plat, Final Plat and Construction Details comply with City
ordinances and with standard engineering practices and principles. I would recommend
approval of the proposed subdivision to County.
If you have any questions or need any further information, please call me at (940) 391-4845.
Sincerely;
Main i. vvveriS, P.E.
General Civil Consulting Engineer
Cc: Lee Allison, P.E. —Isbell Engineering Group, Inc.
dio
April 18, 2002
Mr. Jack Smith
City of Sanger
P.O. Box 1729
Sanger, Texas 76266
Re: Fallmeadow Phase II &III —Preliminary Plat &Construction Details
37 Residential Lots
Sanger ETJ
2nd Review
Dear Mr. Smith:
Per your request I have finished a second review of the Preliminary Plat and Construction Details
as prepared and submitted by Isbell Engineering Group, Inc. for the project referenced above.
Comments are referenced by the Subdivision Ordinance of the City of Sanger, Texas as adopted
September 21, 1987, Zoning Ordinance adopted August 3, 1987, and Ordinance No. MmO&01.
My review comments are as follows.
General
1. The property is generally located north of FM 455 and west of Union Hill Road in the
eastern portion of the Citys ETJ.
Preliminary Plat
1. Scale of Vicinity Map should be 1" = 2000'. The vicinity map should show an area of at
least 1 mile in each direction from the project. The word "VICINITY" is misspelled. This
was not addressed from my previous letter
2. The plat shows contours but the elevations are not legible.
3. The existing ROW lines for Fallmeadow Drive through Phase I need to shown.
4. Dimensions are shown for the detention area in the north part of Lot 45 but I do not see
where this area is called out as a drainage easement. The whole detention area should be
shown as a drainage easement.
S. There is a building line call out and a drainage utility easement call out that need to be
removed from the southwest corner of Lot 45.
P,O. Box 596
Construction Details
Sheet 12 - Sizing calculations have been provided and it is not clear from the calculations if the
"North" detention basin includes both basins on each side of Fallmeadow Drive.
According to the calculations, the calculated discharge flows exceed the total
allowable discharge flows for the 50, 25, 10, 5 and 2-year storm events which does
meet Denton County's requirement of zero impact.
Sheet 14 —Initially channels were utilized at the back of the lots to direct flow to the stormwater
detention basins. This has changed by removing the channels and replacing them with
berms. From the drawing it is not clear how the flow will transition from the berm
into the channel. The berm should have some type of rock riprap applied to the area
of the berm subjected to captured flows entering into the basin from the area upstream
of the berms.
If you have any questions or need any further information, please call me at (940) 391-4845.
Sincerely; '
Mark T. Owens, P.E.
General Civil Consulting Engineer
Cc: Lee Allison, P.E. —Isbell Engineering Group, Inc.