Loading...
01/18/1994-CC-Agenda Packet-Work SessionCITY COUNCIL WORKSHOP AGENDA JANUARY 18, 1994 201 BOLIVAR STREET, CITY HALL 5:30 P.M. 1. Call Meeting to Order 2. Discussion Regarding Proposed Water/Sewer Bond Frojects 3. Discussion Regarding Street Improvement Program tt 1'�icriiccinn RPssarriinss �ir]Pwalk TmnrnvemeritS 5. Any Other Such Matters 6. Adjournment Rosalie Chavez, City 3:30 p.m. Date &Time Posted MEMORANDUM #2415 TO: FROM: DATE. SUBJECT: CITY OF SANGER P. O. BOX 578 SANGER, TEXAS 76266 Honorable Mayor & John Hamilton, City January 14, 1994 Workshop Members of the City Council Administrator The summaries from last year's Public Works Projects Workshop are enclosed for your review. Mr. John Mears of Hunter Associates will be present to aid in the discussion. A light supper will be provided. JH:es Enclosures Proposed Revenue Bond, Water/Sewer Projects 1993 Sewer Projects 1). FM 455 (4th St. to Sanger West Blvd.} 2800 ft. X $30 = _ 84,000 2). I-35 W. Access Road (North Across Freeway) 1000 ft. X $30 = $30,000 + $50,000 (Bore) _ $80,000 3�. Cowling' Road (Upper Lift Station to Lower Lift Station} 1600 ft. X $30 = $48,000 4}. Freese Dr. (West to I-35 Access Road) 800 ft. X $30 = $4, 0 0 0 5). I-35 E. Access Road (From Southside Dr. S. to Existing Line) 1200 ft. X $30 = _ 36,000 6). Belz Road (W. from I-35) 200 ft. X $30 = $B0,000 7). I-35 W. Access Road (455 to Belz Rd.) 3200 ft. X $30 = $969000 8). Keeton, Holt to Benjamin 1400 ft. X $30 = $42.0OO 9). I-35, E. Access Road (Wood, S. to Austin) 1200 ft. X $30 = $36,000 TOTAL SEWER $506,000.00 $30 per ft, estimate provided by Hunter Associates Water Projects 1). Cowling Rd. (From Loop 138, South) 2000 ft. X $20 = $40,000 2). Freese Dr. (From David S. to Loop 138) 600 ft. X $20 = $1,000 3}. Loop 138 (I-35 Access Road, East) 1200 ft. X $20 = $24,000 4}. Hughes St. 1000 ft. X $20 = _ 20,000 5). I-35 East Access Rd. (Wood to Austin) 1200 ft. X $20 6}. I-35JN.W. City Limits 3200 its 7). Sims Street 600 ft. X $20 = $12, 00 0 8). Kirkland Street 270 ft. X $20 = $ ,400 9). Railroad Ave. (S. from Willow) 2800 ft. X $20 = $56,000 10). FM 455 (2nd, East to City Limits) 4800 ft. X $20 = $ 6vOOO 11). Church Street (I-35, East to 7th) 2000 ft. X $20 = $40,000 12). I-35(E), Pecan South to Hughes 1200 ft. X $20 = $ 2 4 v 0 0 0 13). Selz Road, (W. from I-35) 2400 ft. X $20 = $48,000 14}. Loop 138 U-35, W. to Keeton} 1200 ft. X $20 = $24,000 15}. Austin St. {I-35, E, to Freese} 800 ft. X $20 = $16,000 16}. Jennifer Circle (South to Keeton} 1600 ft. X $20 = $329000 17}. 300,000 Gallon Ground Storage = $250,000 18}. Loop (Connect} All Existing Lines 3800 ft. X $20 = $76,000 TGTAL �t1ATER $863,400 $20 per ft. provided by Hunter Associates and assumes a 6" line. V(TATER $ 863,400 SEWER 506,000 $1,369 400 f REPLACEMENT OF EXISTING 2 INCHIATER LINES (AS CURRENTLY CONFIGURED) EAST OF I-35 39,000 ft. X $2Cl per t. $780,000 �(IEST OF I-35 15,000 ft. $2"Ier ft. $3000000 The 2 inch lines are the oldest lines in the city. Our current subdivision ordinance requires 6 inch lines as the minimum size. Fire suppression is also a consideration in replacement. For discussion, if the entire 54,000 ft. of line were replaced, and using 400 ft. as a spacing goal for fire hydrants, if all new hydrants were purchased at approximately $1,000 each, these would require an additional $135,000, bring the estimated cost to $1,215,000. "NOTE: 1). These estimates An not include the cost of new water service taps. The approximate material cost for this item would be $45.00 per connection. 2). If these costs were placed on a fifteen (15) year Capital (Budget} Replacement Program, it would require about $81,000 per year, commencing in FY 93/94 and ending in FY 08/09. 3}. The distance figures do not reflect any lines within the Mobile Home Parks that are the City's responsibility. Proposed Street Improvements Lo cation 10th St. - Bolivar/ 455 Peach - 7th/ Loop 138 7th St, -Bolivar/ Elm Hughes - 1Qthj I-35 1 lth -Hughes/ Bolivar 1 lth - Hughesj Bolivar Willow - 1Qth/ Loop 138 # Feet t�lidth $ per feet 1700 3l' $108 5QQ 31' 1QQQ 31' 32Q 25' 32Q 25' 14QQ 31' Keeton -Brook Glen/Duck Creek 18QQ 31' Bolivar/Berry/ Holt Duck Creek - I-35/ Keeton 24QQ 31' 14Q0 31' Feb-93 Revised D ec-93 Total $'s $183,6QQ 27, QQQ 28, 8QQ $151, 2QQ $151,2QQ Extend Keeton to Perry 14QQ 31 $1Q8 $151, 2QQ $87, 500 $ 238, 7 0 0 (Estimate) Acquire Right of Way 1400 Ft. X 50 Ft. = 70,000 sq. ft. X 4 1.25 per so. ft. $87, 500 A ctin Ct _ Tlpntnn/ T-AA 1 SOO 31' $ 1Q8 $162.000 Denton -Austin/ Willow 13QQ 25' $9Q $117,QQQ ?th - Feach/ 455 8QQ 25' $9Q $81,QOQ 6th - PolivarJ Willow JQQ 25' $9Q $81,QQQ 6th - PolivarJ Elm 2QQ 25' $9Q $18,QQQ 7th -Willow/ Houston 13QQ 25' $9Q $117,QQ0 Marshall - 7th/ 2nd 12QQ 25' $9Q $1Q8,QQQ 2nd - 455/ Wayne 46QQ 31' $1Q8 $496,8QQ Willow - Loop 138/City Limits 2600 31' $ lab Marshall - 7t11/ lath 4th -Elm/ 455 p�r�n _ 7th/ 1 tlth ♦r R•{All Bolivar - I-35/ Loop 13b Elm - 7th/ I-35 12th -Elm/ Bolivar Railroad - t�Tillowj 455 Brook +Glen - E to I-35 Keeton Road, FM 455 S. to Duck Creek luau 25 $aa 12aa 25' $9a fan 25' $�a 23aa 31' $lab 16aa 25' 2aa 25' 4aa 25' $9a Culverts (@ 1.25) R O. Wa 3, boa 31' $lab $144,aaa $252,aaa TOTALS 40, 940 $ % 337, 300 " Underground electric utility, material cost is estimated at $25, 000 for every 5000 linear feet. The cost per ft. is estimated and could be impacted by drainage corners requiring underground pipe and inlets. As an example, 7th Street in front of the Middle School averaged $130 per linear ft. ,rC.r%th gtrnt ►arith itc laresP "Ilrnlipr of nriunfe i. AA Aa p•IvA v y ...w. ..... ..... b�- ......--..� �- "- r'--- ---- driveways averaged about $105 per fit. and Acker Street was about $80 per ft. All these streets are 3l' wide. CITY OF SANGER P. O. BOX 578 SANGER, TEXAS 76266 MEMORANDUM #2386 TO: Honorable Mayor & Members of the City Council FROM: John Hamilton, City Administrator DATE: December 17, 1993 SUBJECT: Report on Financing Options By Southwest Securities - Dan Almon Mr. Almon will be present to discuss financing opiions and costs for fu�ure street, library and water/wastewater projects. Factors to consider are: 1 }. Term of issue. 2}. Related costs of issue. 3}. Both long and short term goals in the areas of streets, library and water/wastewater. 4}. Annual debt service cost as a total and as a percentage of budget. 5}. Certificates of Obligation cannot be refunded by new certificates. 6}. Will funds be used within three (3} years? 7}. Certificates of Obligation do not require an election. Staff has identified several possible street improvement projects in no particular order: Street Street Construction Estimated Costs 12/ A 3 Width 31' 1}. Austin Street - 2200' G $130 = $286,QQQ (Denton to Church, Walnut Ln.) 31' 2}. Tenth Street - 2200' @ $130 - $286,QQQ (From Bolivar N) 27' 3}. Wood Street - 1000' @ $115 = $1 15,QQQ (1Qth to 7th &Willow} #2386, 12/ 17/93, page 2 27' 4). Brook Glen (extension) 400' @ $115 = $ 46,000 + culvert 306000 (If ROW donated) $ 76,000 31' 5). Keaton Road - 1400' @ $130 = $182,000 (N. From Brook Glen) 27' 6). Marshall Street - 700' @ $115 = $ 80,500 (5th E. to 2nd) 31' 7). Sixth Street - 600' @ $130 = $ 78,000 (Cherry N to Elm) 31' 8). Seventh Street - 225' @ 130 = $ 29,250 (Bolivar to Elm) 9). Drainage - Keaton Road/Willow St. _ $ 80,000 10). Willow Street - 1200' @ $130 = $156v000 RR - East Total $1,368,750 As you all are aware, there are many residential streets in the older sections of town that are candidates for renovation. The cost estimates listed do not I nclude engineer or utility improvements/relocation. Four of the ten listed; Austin, Tenth, Keaton and Willow are main traffic arteries; Wood St. is primarily for drainage improvements; Brook Glen is to improve accessibility and for public safety, Marshall is for drainage and its general bad repair; Sixth Street is for drainage and safety around the Post Office and proposed library, Seventh Street is for drainage and access to the Middle School; and the drainage improvements were discussed to prevent possible flooding. The water/sewer improvements would be to improve/expand the system for both fire protection and delivery capability (water) and make sewer available for every current resident and/or business in the community. The library portion of this $350,000, could be reduced if the City is successful in securing a $100,000 state grant. This discussion does not require action, but is intended as a preliminary discussion; however, if Council wants a street improvement program for the summer of 1994, some plan of action will need to be adopted as early as passible in 1994. JH:es, Enclosures